Science.gov

Sample records for alarm control panel

  1. Alarm system for a nuclear control complex

    DOEpatents

    Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.

    1994-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

  2. Alarm Management System for the D/3 Distributed Control System

    1997-03-19

    As industrial processes continue to grow in size and complexity, the Distrubuted Control Systems that automate and monitor these processes expand in a like manner. This increase in control system complexity has resulted in ever increasing numbers of alarms presented to the operator. The challenge for today's control system designer is to find innovative ways to present alarm information to the operator such that despite the large number of alarms, the operator is able tomore » quickly assess the status of the plant and immediately respond to the most critical alarms in a timely manner. This software package, designed and developed for the Savannah River Site Replacement High Level Waste Evaporator/Waste Removal Distributed Control System installed on the H-Area Tank Farm, provides an alarm system which utilizes the annunciator (SKID) panel as a means of statusing the plant and providing single keystroke access to the display on which an alarm resides.« less

  3. Alarm Management System for the D/3 Distributed Control System

    SciTech Connect

    McEver, M.

    1997-03-19

    As industrial processes continue to grow in size and complexity, the Distrubuted Control Systems that automate and monitor these processes expand in a like manner. This increase in control system complexity has resulted in ever increasing numbers of alarms presented to the operator. The challenge for today's control system designer is to find innovative ways to present alarm information to the operator such that despite the large number of alarms, the operator is able to quickly assess the status of the plant and immediately respond to the most critical alarms in a timely manner. This software package, designed and developed for the Savannah River Site Replacement High Level Waste Evaporator/Waste Removal Distributed Control System installed on the H-Area Tank Farm, provides an alarm system which utilizes the annunciator (SKID) panel as a means of statusing the plant and providing single keystroke access to the display on which an alarm resides.

  4. Control of ELT false alarms

    NASA Technical Reports Server (NTRS)

    Toth, S.; Gershkoff, I.

    1979-01-01

    The statistics of emergency locator transmitter (ELT) alarms are presented. The primary sources of data include ELT Incident Logs, Service Difficulty Reports, and Frequency Interference Reports. The number of reported and unreported alarms is discussed, as are seasonal variations, duration of ELT transmissions, and cost of silencing. Origin, causes, and possible strategies for reducing the impact of alarms on the aviation community are considered.

  5. HYBRID ALARM SYSTEMS: COMBINING SPATIAL ALARMS AND ALARM LISTS FOR OPTIMIZED CONTROL ROOM OPERATION

    SciTech Connect

    Ronald L. Boring; J.J. Persensky

    2012-07-01

    The US Department of Energy (DOE) is sponsoring research, development, and deployment on Light Water Reactor Sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current nuclear power plants. One of the main areas of focus is control room modernization. Within control room modernization, alarm system upgrades present opportunities to meet the broader goals of the LWRS project in demonstrating the use and safety of the advanced instrumentation and control (I&C) technologies and the short-term and longer term objectives of the plant. In this paper, we review approaches for and human factors issues behind upgrading alarms in the main control room of nuclear power plants.

  6. 8. INTERIOR, FIRE ALARM CONTROL ROOM (NORTH OF MAIN GARAGE), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. INTERIOR, FIRE ALARM CONTROL ROOM (NORTH OF MAIN GARAGE), FROM ENTRYWAY, LOOKING NORTH, SHOWING ADDITIONAL 'GAMEWELL' FIRE ALARM SYSTEMS. - Oakland Naval Supply Center, Firehouse, East of Fourth Street, between A & B Streets, Oakland, Alameda County, CA

  7. 46 CFR 154.1842 - Cargo system: Controls and alarms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Cargo system: Controls and alarms. 154.1842 Section 154.1842 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY STANDARDS FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Operations § 154.1842 Cargo system: Controls and alarms. The master...

  8. 1. Photographic copy of fire alarm plan for Control and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photographic copy of fire alarm plan for Control and Recording Center Building 4221/E-22, showing layout of rooms. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering 'Edwards Test Station, Fire Alarm Plan, Bldg. E-22,' drawing no. EFA/11-1, December 15, 1961. - Jet Propulsion Laboratory Edwards Facility, Control & Recording Center, Edwards Air Force Base, Boron, Kern County, CA

  9. Fire alarm system improvement

    SciTech Connect

    Hodge, S.G.

    1994-10-01

    This document contains the Fire Alarm System Test Procedure for Building 234-5Z, 200-West Area on the Hanford Reservation, Richland, Washington. This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the modifications to the Fire Protection systems function as required by project criteria. The ATP will test the Fire Alarm Control Panels, Flow Alarm Pressure Switch, Heat Detectors, Smoke Detectors, Flow Switches, Manual Pull Stations, and Gong/Door by Pass Switches.

  10. 46 CFR 154.1842 - Cargo system: Controls and alarms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Cargo system: Controls and alarms. 154.1842 Section 154.1842 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY STANDARDS FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Operations § 154.1842...

  11. 46 CFR 154.1842 - Cargo system: Controls and alarms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Cargo system: Controls and alarms. 154.1842 Section 154.1842 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY STANDARDS FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Operations § 154.1842...

  12. 46 CFR 154.1842 - Cargo system: Controls and alarms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Cargo system: Controls and alarms. 154.1842 Section 154.1842 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY STANDARDS FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Operations § 154.1842...

  13. 46 CFR 154.1842 - Cargo system: Controls and alarms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Cargo system: Controls and alarms. 154.1842 Section 154.1842 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY STANDARDS FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Operations § 154.1842...

  14. Integrated alarm annunciation and entry control systems -- Survey results

    SciTech Connect

    Clever, J.J.; Arakaki, L.H.; Monaco, F.M.; Juarros, L.E.; Quintana, G.R.

    1993-10-01

    This report provides the results and analyses of a detailed survey undertaken in Summer 1993 to address integrated intrusion detection alarm annunciation and entry control system issues. This survey was undertaken as a first attempt toward beginning to answer questions about integrated systems and commercial capabilities to meet or partially meet US Department of Energy (DOE) site needs.

  15. Alarms Philosophy

    SciTech Connect

    White, Karen S; Kasemir, Kay

    2009-01-01

    An effective alarm system consists of a mechanism to monitor control points and generate alarm notifications, tools for operators to view, hear, acknowledge and handle alarms and a good configuration. Despite the availability of numerous fully featured tools, accelerator alarm systems continue to be disappointing to operations, frequently to the point of alarms being permanently silenced or totally ignored. This is often due to configurations that produce an excessive number of alarms or fail to communicate the required operator response. Most accelerator controls systems do a good job of monitoring specified points and generating notifications when parameters exceed predefined limits. In some cases, improved tools can help, but more often, poor configuration is the root cause of ineffective alarm systems. A SNS, we have invested considerable effort in generating appropriate configurations using a rigorous set of rules based on best practices in the industrial process controls community. This paper will discuss our alarm configuration philosophy and operator response to our new system.

  16. NAS Panel faults export controls

    NASA Astrophysics Data System (ADS)

    Katzoff, Judith A.

    A study prepared by a top-level panel says that current export controls on militarily sensitive U.S. technology may be “overcorrecting” previous weaknesses in that system, resulting in “a complex and confusing control system” that makes it more difficult for U.S. businesses to compete in international markets. Moreover, this control system has “an increasingly corrosive effect” on U.S. relations with allies. The panel recommended that the United States concentrate more effort on bringing about uniformity in the export control policies of countries belonging to the Coordinating Committee on Multilateral Export Controls (CoCom), i.e., most of the member nations in NATO (the North Atlantic Treaty Organization) and Japan.The 21-member panel was appointed by the Committee on Science, Engineering, and Public Policy (COSEPUP), a joint unit of the National Academy of Sciences (NAS), the National Academy of Engineering (NAE), and the Institute of Medicine (IOM). The panel, composed of administrators, researchers, and former government officials, was chaired by AGU member Lew Allen, Jr., director of the Jet Propulsion Laboratory (Pasadena, Calif.) and former chief of staff of the U.S. Air Force. Their report was supported by NAS funds, by a number of private organizations (including AGU), by the U.S. Departments of Commerce, Defense, Energy, and State, by the National Science Foundation, and by the National Aeronautics and Space Administration.

  17. INEL central alarm monitoring and assessment system

    SciTech Connect

    Niper, E.D.

    1983-07-01

    This paper concerns the design and development of a centrally located security monitoring and assessment system for processing alarms at several remote facilities. The system provides both live and recorded CCTV assessment of alarmed areas. Computer controlled video disc recordings are made at the time the alarm is activated. Alarming areas are displayed on a color graphics monitor and an operator interacts through an overlying transparent touch panel. Computer-generated messages are also displayed to assist and inform the operator. A bidirectional, frequency-multiplexed cable system provides digital alarm information, video control commands, and several channels of video from each remote facility.

  18. T-Farm complex alarm upgrades

    SciTech Connect

    Roberts, J.B.

    1995-01-01

    The alarm and controls associated with the T, TX, and TY farms are located in the 242-T control room. The design data for replacement and upgrades of the alarm panels is in this document. This task was canceled previous to the 90% design review point.

  19. Cancer prevention and control: alarming challenges in China

    PubMed Central

    Bode, Ann M.; Dong, Zigang; Wang, Hongyang

    2016-01-01

    China is geographically the third largest country in the world and the most populated low-to-middle-income country. Cancer incidence and mortality rates for some cancers in the USA and European countries have steadily decreased over the last decades, whereas the incidence and mortality of certain cancers in China have been increasing at an alarming speed. Rapid industrialization and urbanization in China have been accompanied by incredible changes in lifestyle and environment combined with an aging population. Mortality caused by lung, colorectal and breast cancers has been steadily increasing, whereas cancer mortality from gastric, esophageal and cervical tumors has tended to decrease. Similar to what has occurred in the United States, unhealthy lifestyles in China, including heavy smoking and poor diet combined with pollution, have contributed to increased cancer risk. China is facing many challenges in cancer treatment and prevention for the general population. The major areas that need to be addressed in the control of cancer in China include cancers associated with environmental pollution, tobacco use, occupational carcinogens, infection, excessive alcohol consumption, dietary deficiencies and obesity. In this perspective, we review the problems in each area and suggest ideas for future directions in cancer research and strategies and actions to reduce the incidence of cancer in China. PMID:27308066

  20. 65. DETAIL OF ASSISTANT LAUNCH CONTROLLER AND LAUNCH CONTROLLER PANELS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    65. DETAIL OF ASSISTANT LAUNCH CONTROLLER AND LAUNCH CONTROLLER PANELS LOCATED NEAR CENTER OF SLC-3E CONTROL ROOM. NOTE 30-CHANNEL COMMUNICATIONS PANELS. PAYLOAD ENVIRONMENTAL CONTROL AND MONITORING PANELS (LEFT) AND LAUNCH OPERATORS PANEL (RIGHT) IN BACKGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  1. The Neutron Monitor Control Panel

    NASA Astrophysics Data System (ADS)

    García-Población, O.; Ivanov, H.; García-Tejedor, I.; Blanco, J. J.; Medina, J.; Gómez-Herrero, R.; Catalán, E.; Radchenko, D.

    2015-08-01

    This work presents the current status and future plans of the Neutron Monitor Control Panel (NMCP), a new software developed to aid the operator in typical station maintenance and configuration operations. This software is integrated with the new so-called NOAS data acquisition system and it can be accessed using a supported web browser. It features a visual inspection tool to help the operator to identify spikes in the data, trace the origin of the spike back to the raw readings of each counter tube and pressure reading, and mark the data as invalid in the Neutron Monitor Database if desired. The software also provides information about station operation status, some descriptive statistics about current data being recorded and, in the future, will provide an interface to configure station parameters.

  2. 30 CFR 77.310 - Control panels.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... each thermocouple, pressure tap, or other control or gaging instrument in the drying system shall be posted on or near the control panel of each thermal drying system. (c) Each instrument on the...

  3. 30 CFR 77.310 - Control panels.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... each thermocouple, pressure tap, or other control or gaging instrument in the drying system shall be posted on or near the control panel of each thermal drying system. (c) Each instrument on the...

  4. 30 CFR 77.310 - Control panels.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... each thermocouple, pressure tap, or other control or gaging instrument in the drying system shall be posted on or near the control panel of each thermal drying system. (c) Each instrument on the...

  5. 30 CFR 77.310 - Control panels.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... each thermocouple, pressure tap, or other control or gaging instrument in the drying system shall be posted on or near the control panel of each thermal drying system. (c) Each instrument on the...

  6. 30 CFR 77.310 - Control panels.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... each thermocouple, pressure tap, or other control or gaging instrument in the drying system shall be posted on or near the control panel of each thermal drying system. (c) Each instrument on the...

  7. Vibrational Control of a Nonlinear Elastic Panel

    NASA Technical Reports Server (NTRS)

    Chow, P. L.; Maestrello, L.

    1998-01-01

    The paper is concerned with the stabilization of the nonlinear panel oscillation by an active control. The control is actuated by a combination of additive and parametric vibrational forces. A general method of vibrational control is presented for stabilizing panel vibration satisfying a nonlinear beam equation. To obtain analytical results, a perturbation technique is used in the case of weak nonlinearity. Possible application to other types of problems is briefly discussed.

  8. INEL central alarm monitoring and assessment system

    SciTech Connect

    Niper, E.D.

    1983-01-01

    This paper concerns the design and development of a centrally located security monitoring and assessment system for processing alarms at several remote facilities. The system provides both live and recorded CCTV assessment of alarmed areas. Computer controlled video disc recordings are displayed on a color graphics monitor and an operator interacts through an overlying transparent touch panel. Computer generated messages are also displayed to assist and inform the operator. A bidirectional, frequency-multiplexed cable system provides digital alarm information, video control commands, and several channels of video from each remote facility.

  9. 17. DETAIL OF CONTROL PANEL FOR FILTER #9: CONTROL SWITCHES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. DETAIL OF CONTROL PANEL FOR FILTER #9: CONTROL SWITCHES CONTROL BY PERCENTAGE OF VALVE OPENINGS INFLUENT, EFFLUENT, DRAINAGE, BACKWASH AND SURFACE WASH. - F. E. Weymouth Filtration Plant, 700 North Moreno Avenue, La Verne, Los Angeles County, CA

  10. 3. VAL CONTROL STATION, VIEW OF CONTROL PANELS SHOWING MAIN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. VAL CONTROL STATION, VIEW OF CONTROL PANELS SHOWING MAIN PRESSURE GAUGES, LOOKING NORTH. - Variable Angle Launcher Complex, Control Station, CA State Highway 39 at Morris Reservior, Azusa, Los Angeles County, CA

  11. DETAIL INTERIOR VIEW OF CONTROL PANEL IN CONTROL STATION, VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL INTERIOR VIEW OF CONTROL PANEL IN CONTROL STATION, VIEW TOWARDS WEST - St. Lucie Canal, Lock No. 1, Control Station, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  12. Looking Northwest at Furnace Control Panels and Gas Control Furnace ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Looking Northwest at Furnace Control Panels and Gas Control Furnace in Red Room Within Recycle Recovery Building - Hematite Fuel Fabrication Facility, Recycle Recovery Building, 3300 State Road P, Festus, Jefferson County, MO

  13. 29. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, LOOKING SOUTH (LOCATION Q) - Shippingport Atomic Power Station, On Ohio River, 25 miles Northwest of Pittsburgh, Shippingport, Beaver County, PA

  14. 28. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, LOOKING NORTH (LOCATION Q) - Shippingport Atomic Power Station, On Ohio River, 25 miles Northwest of Pittsburgh, Shippingport, Beaver County, PA

  15. 141. Detail of east control panel in control room, looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    141. Detail of east control panel in control room, looking east. This panel contains electrical switches that were used to control valves at circular forebay. It also contains voltage regulators, synchroscope adjust field breaker, ammeters, wattmeters, temperature indicator of generator windings, and butterfly valve and governor controls. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  16. VIEW OF PDP AND LTR CONTROL PANEL (LEFT) AND HEAVY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF PDP AND LTR CONTROL PANEL (LEFT) AND HEAVY WATER CONTROL PANEL (RIGHT) AT SOUTH END OF PDP CONTROL ROOM, LEVEL 0’, LOOKING SOUTH - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC

  17. Local feedback control of light honeycomb panels.

    PubMed

    Hong, Chinsuk; Elliott, Stephen J

    2007-01-01

    This paper summarizes theoretical and experimental work on the feedback control of sound radiation from honeycomb panels using piezoceramic actuators. It is motivated by the problem of sound transmission in aircraft, specifically the active control of trim panels. Trim panels are generally honeycomb structures designed to meet the design requirement of low weight and high stiffness. They are resiliently mounted to the fuselage for the passive reduction of noise transmission. Local coupling of the closely spaced sensor and actuator was observed experimentally and modeled using a single degree of freedom system. The effect of the local coupling was to roll off the response between the actuator and sensor at high frequencies, so that a feedback control system can have high gain margins. Unfortunately, only relatively poor global performance is then achieved because of localization of reduction around the actuator. This localization prompts the investigation of a multichannel active control system. Globalized reduction was predicted using a model of 12-channel direct velocity feedback control. The multichannel system, however, does not appear to yield a significant improvement in the performance because of decreased gain margin. PMID:17297778

  18. Ergonomic Redesign of an Industrial Control Panel.

    PubMed

    Raeisi, S; Osqueizadeh, R; Maghsoudipour, M; Jafarpisheh, A S

    2016-07-01

    Operator's role in industrial control centers takes place in time, which is one of the most important determinants of whether an expected action is going to be successful or not. In certain situations, due to the complex nature of the work, the existing interfaces and already prepared procedures do not meet the dynamic requirements of operator's cognitive demands, making the control tasks unnecessarily difficult. This study was conducted to identify ergonomic issues with a specific industrial control panel, and redesign its layout and elements to enhance its usability. Task and link analysis methodologies were implemented. All essential functions and supporting operations were identified at the required trivial levels. Next, the weight of any possible link between the elements of the panel was computed as a composite index of frequency and importance. Finally, all components were rearranged within a new layout, and a computerized mockup was generated. A total of 8 primary tasks was identified, including 4 system failure handling tasks, switching between manual and automated modes, and 3 types of routine vigilance and control tasks. These tasks were broken down into 28 functions and 145 supporting operations, accordingly. Higher link values were observed between hand rest position and 2 elements. Also, 6 other components showed robust linkages. In conclusion, computer modeling can reduce the likelihood of accidents and near misses in industrial control rooms by considering the operators' misperception or mental burden and correcting poor design of the panels and inappropriate task allocation. PMID:27393326

  19. Practical look at control panel enhancement

    SciTech Connect

    Gonzalez, W.R.; Smith, D.L.

    1984-03-01

    The accident at Three Mile Island has caused attention to be focused on human factors engineering concerns in the design of nuclear power-plant control rooms and in control panels in particular. Examples from a control room review and enhancement task are described and discussed with reference to the need for a careful interpretation of Section 6 of NUREG-0700, which offers guidance for evaluation of control rooms but with very little retrofit information. Two Electric Power Research Institute studies that provide limited retrofit guidance are noted, and recommendations about further research are made.

  20. FAULT DIAGNOSIS WITH MULTI-STATE ALARMS IN A NUCLEAR POWER CONTROL SIMULATOR

    SciTech Connect

    Austin Ragsdale; Roger Lew; Brian P. Dyre; Ronald L. Boring

    2012-10-01

    This research addresses how alarm systems can increase operator performance within nuclear power plant operations. The experiment examined the effect of two types of alarm systems (two-state and three-state alarms) on alarm compliance and diagnosis for two types of faults differing in complexity. We hypothesized three-state alarms would improve performance in alarm recognition and fault diagnoses over that of two-state alarms. We used sensitivity and criterion based on Signal Detection Theory to measure performance. We further hypothesized that operator trust would be highest when using three-state alarms. The findings from this research showed participants performed better and had more trust in three-state alarms compared to two-state alarms. Furthermore, these findings have significant theoretical implications and practical applications as they apply to improving the efficiency and effectiveness of nuclear power plant operations.

  1. Fault Diagnosis with Multi-State Alarms in a Nuclear Power Control Simulation

    SciTech Connect

    Stuart A. Ragsdale; Roger Lew; Ronald L. Boring

    2014-09-01

    This research addresses how alarm systems can increase operator performance within nuclear power plant operations. The experiment examined the effects of two types of alarm systems (two-state and three-state alarms) on alarm compliance and diagnosis for two types of faults differing in complexity. We hypothesized the use of three-state alarms would improve performance in alarm recognition and fault diagnoses over that of two-state alarms. Sensitivity and criterion based on the Signal Detection Theory were used to measure performance. We further hypothesized that operator trust would be highest when using three-state alarms. The findings from this research showed participants performed better and had more trust in three-state alarms compared to two-state alarms. Furthermore, these findings have significant theoretical implications and practical applications as they apply to improving the efficiency and effectiveness of nuclear power plant operations.

  2. 6. COMPRESSOR CONTROL PANELS: AT LEFT, 6,000 P.S.I. PANEL, CIRCA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. COMPRESSOR CONTROL PANELS: AT LEFT, 6,000 P.S.I. PANEL, CIRCA 1957; AT RIGHT, FACING CAMERA, 10,000 P.S.I. PANEL. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Helium Compression Plant, Test Area 1-115, intersection of Altair & Saturn Boulevards, Boron, Kern County, CA

  3. 58. DETAIL OF PAYLOAD CONTROL PANELS IN CONSOLE NEAR NORTHEAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. DETAIL OF PAYLOAD CONTROL PANELS IN CONSOLE NEAR NORTHEAST CORNER OF SLC-3E CONTROL ROOM. THIS CONSOLE HAS THREE PANELS. NOTE 'SLAVE' COMMUNICATIONS PANEL IN FOREGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  4. 60. DETAIL OF PAYLOAD CONTROL PANEL AT EAST END OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    60. DETAIL OF PAYLOAD CONTROL PANEL AT EAST END OF CONSOLE IN NORTHWEST CORNER OF SLC-3E CONTROL ROOM. NOTE AMPLIFIER (LEFT PANEL, CENTER) FOR SLAVE COMMUNICTIONS PANEL. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  5. 61. DETAIL OF COMPLEX SAFETY CONTROL PANEL IMMEDIATELY WEST OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    61. DETAIL OF COMPLEX SAFETY CONTROL PANEL IMMEDIATELY WEST OF PAYLOAD PANEL SHOWN IN CA-133-1-A-60. NOTE 30-CHANNEL COMMUNICATIONS PANEL. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  6. Novel neural networks-based fault tolerant control scheme with fault alarm.

    PubMed

    Shen, Qikun; Jiang, Bin; Shi, Peng; Lim, Cheng-Chew

    2014-11-01

    In this paper, the problem of adaptive active fault-tolerant control for a class of nonlinear systems with unknown actuator fault is investigated. The actuator fault is assumed to have no traditional affine appearance of the system state variables and control input. The useful property of the basis function of the radial basis function neural network (NN), which will be used in the design of the fault tolerant controller, is explored. Based on the analysis of the design of normal and passive fault tolerant controllers, by using the implicit function theorem, a novel NN-based active fault-tolerant control scheme with fault alarm is proposed. Comparing with results in the literature, the fault-tolerant control scheme can minimize the time delay between fault occurrence and accommodation that is called the time delay due to fault diagnosis, and reduce the adverse effect on system performance. In addition, the FTC scheme has the advantages of a passive fault-tolerant control scheme as well as the traditional active fault-tolerant control scheme's properties. Furthermore, the fault-tolerant control scheme requires no additional fault detection and isolation model which is necessary in the traditional active fault-tolerant control scheme. Finally, simulation results are presented to demonstrate the efficiency of the developed techniques. PMID:25014982

  7. Laminar flow control perforated wing panel development

    NASA Technical Reports Server (NTRS)

    Fischler, J. E.

    1986-01-01

    Many structural concepts for a wing leading edge laminar flow control hybrid panel were analytically investigated. After many small, medium, and large tests, the selected design was verified. New analytic methods were developed to combine porous titanium sheet bonded to a substructure of fiberglass and carbon/epoxy cloth. At -65 and +160 F test conditions, the critical bond of the porous titanium to the composite failed at lower than anticipated test loads. New cure cycles, design improvements, and test improvements significantly improved the strength and reduced the deflections from thermal and lateral loadings. The wave tolerance limits for turbulence were not exceeded. Consideration of the beam column midbay deflections from the combinations of the axial and lateral loadings and thermal bowing at -65 F, room temperature, and +160 F were included. Many lap shear tests were performed at several cure cycles. Results indicate that sufficient verification was obtained to fabricate a demonstration vehicle.

  8. 52. VIEW OF REMAINS OF ORIGINAL 1907 CONTROL PANEL, LOCATED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. VIEW OF REMAINS OF ORIGINAL 1907 CONTROL PANEL, LOCATED ON NORTH WALL OF EAST END OF CONTROL ROOM. PORTIONS OF THIS PANEL REMAINED IN USE UNTIL THE PLANT CLOSED. THE METERS AND CONTROLS ARE MOUNTED ON SOAPSTONE PANELS. THE INSTRUMENT IN THE LEFT CENTER OF THE PHOTOGRAPH IS A TIRRILL VOLTAGE REGULATOR. - New York, New Haven & Hartford Railroad, Cos Cob Power Plant, Sound Shore Drive, Greenwich, Fairfield County, CT

  9. 2. VIEW OF THE EXPERIMENT CONTROL PANEL IN 1970. THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW OF THE EXPERIMENT CONTROL PANEL IN 1970. THE NUCLEAR SAFETY GROUP CONDUCTED ABOUT 1,700 CRITICAL MASS EXPERIMENTS USING URANIUM AND PLUTONIUM IN SOLUTIONS (900 TESTS), COMPACTED POWDER (300), AND METALLIC FORMS (500). ALL 1,700 CRITICALITY ASSEMBLIES WERE CONTROLLED FROM THIS PANEL. - Rocky Flats Plant, Critical Mass Laboratory, Intersection of Central Avenue & 86 Drive, Golden, Jefferson County, CO

  10. 48. CONTROL PANEL FOR UMBILICAL MAST AND TRENCH DOORS. LAUNCHER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. CONTROL PANEL FOR UMBILICAL MAST AND TRENCH DOORS. LAUNCHER ON RIGHT IN BACKGROUND; TRENCH DOORS AND RAIL BEHIND CONTROL PANEL - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  11. 16. VIEW OF THE STATIONARY OPERATING ENGINEER CONTROL PANEL INSTALLATION. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. VIEW OF THE STATIONARY OPERATING ENGINEER CONTROL PANEL INSTALLATION. THE PANEL CONTROLS AIR-HANDLING EQUIPMENT AND AIR PRESSURE WITHIN THE BUILDING. (10/6/69) - Rocky Flats Plant, Plutonium Manufacturing Facility, North-central section of Plant, just south of Building 776/777, Golden, Jefferson County, CO

  12. 64. DETAIL OF OBSOLETE AGENA CONTROL PANELS IN CONSOLE LOCATED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    64. DETAIL OF OBSOLETE AGENA CONTROL PANELS IN CONSOLE LOCATED NEAR MIDDLE OF EAST WALL IN SLC-3E CONTROL ROOM - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  13. 29. INTERIOR VIEW TO THE NORTHEAST OF CONTROL PANEL AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. INTERIOR VIEW TO THE NORTHEAST OF CONTROL PANEL AND VIEWING WINDOW IN ROOM 105, THE CONTROL ROOM. - Nevada Test Site, Pluto Facility, Disassembly Building, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV

  14. 10 CFR 34.75 - Records of alarm system and entrance control checks at permanent radiographic installations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... permanent radiographic installations. 34.75 Section 34.75 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.75 Records of alarm system and entrance control checks at permanent...

  15. 10 CFR 34.75 - Records of alarm system and entrance control checks at permanent radiographic installations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... permanent radiographic installations. 34.75 Section 34.75 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.75 Records of alarm system and entrance control checks at permanent...

  16. 10 CFR 34.75 - Records of alarm system and entrance control checks at permanent radiographic installations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... permanent radiographic installations. 34.75 Section 34.75 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.75 Records of alarm system and entrance control checks at permanent...

  17. 10 CFR 34.75 - Records of alarm system and entrance control checks at permanent radiographic installations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... permanent radiographic installations. 34.75 Section 34.75 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.75 Records of alarm system and entrance control checks at permanent...

  18. 10 CFR 34.75 - Records of alarm system and entrance control checks at permanent radiographic installations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Records of alarm system and entrance control checks at permanent radiographic installations. 34.75 Section 34.75 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS...

  19. 59. DETAIL OF THIRD PAYLOAD CONTROL PANEL IN CONSOLE SHOWN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    59. DETAIL OF THIRD PAYLOAD CONTROL PANEL IN CONSOLE SHOWN IN CA-133-1-A-58. NOTE 20-CHANNEL COMMUNICATIONS PANEL IN FOREGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  20. 67. DETAIL OF VIDEO CAMERA CONTROL PANEL LOCATED IMMEDIATELY WEST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    67. DETAIL OF VIDEO CAMERA CONTROL PANEL LOCATED IMMEDIATELY WEST OF ASSISTANT LAUNCH CONDUCTOR PANEL SHOWN IN CA-133-1-A-66 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  1. 17. DETAIL OF STILLCAMERA CONTROL PANEL SHOWING PATCHBOARD FOR SELECTING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. DETAIL OF STILL-CAMERA CONTROL PANEL SHOWING PATCHBOARD FOR SELECTING TIMING OF CAMERAS - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  2. 4. INTERIOR DETAIL OF CONTROL PANEL IN BUILDING 1611. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. INTERIOR DETAIL OF CONTROL PANEL IN BUILDING 1611. VIEW TO NORTHWEST. - Rocky Mountain Arsenal, Ammunition Demolition Building-Tail Fin Storage & Assembly, 2750 feet South of Ninth Avenue; 3480 feet East of D Street, Commerce City, Adams County, CO

  3. 5. INTERIOR DETAIL OF CONTROL PANEL IN BUILDING 1611. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INTERIOR DETAIL OF CONTROL PANEL IN BUILDING 1611. VIEW TO NORTH. - Rocky Mountain Arsenal, Ammunition Demolition Building-Tail Fin Storage & Assembly, 2750 feet South of Ninth Avenue; 3480 feet East of D Street, Commerce City, Adams County, CO

  4. Experiment Study on Fuzzy Vibration Control of Solar Panel

    NASA Astrophysics Data System (ADS)

    Li, Dongxu X.; Xu, Rui; Jiang, Jiangjian P.

    Some flexible appendages of spacecraft are cantilever plate structures, such as solar panels. These structures usually have very low damping ratios, high dimensional order, low modal frequencies and parameter uncertainties in dynamics. Their unwanted vibrations will be caused unavoidably, and harmful to the spacecraft. To solve this problem, the dynamic equations of the solar panel with piezoelectric patches are derived, and an accelerometer based fuzzy controller is designed. In order to verify the effectiveness of the vibration control algorithms, experiment research was conducted on a piezoelectric adaptive composite honeycomb cantilever panel. The experiment results demonstrate that the accelerometer-based fuzzy vibration control method can suppress the vibration of the solar panel effectively, the first bending mode damping ratio of the controlled system increase to 1.64%, and that is 3.56 times of the uncontrolled system.

  5. 130. RELAY SWITCHES AT SOUTH END OF HYDRAULIC CONTROL PANEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    130. RELAY SWITCHES AT SOUTH END OF HYDRAULIC CONTROL PANEL IN UMBILICAL MAST PUMP ROOM (209), LSB (BLDG. 751) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  6. 124. ACCUMULATORS AT LOWER RIGHT SIDE OF HYDRAULIC CONTROL PANEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    124. ACCUMULATORS AT LOWER RIGHT SIDE OF HYDRAULIC CONTROL PANEL IN UMBILICAL MAST PUMP ROOM (209), LSB (BLDG. 751) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  7. 129. INTERIOR OF RELAY BOX FOR HYDRAULIC CONTROL PANEL IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    129. INTERIOR OF RELAY BOX FOR HYDRAULIC CONTROL PANEL IN UMBILICAL MAST PUMP ROOM (209), LSB (BLDG. 751) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  8. 107. UMBILICAL MAST HYDRAULIC CONTROL PANEL IN CENTER OF ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    107. UMBILICAL MAST HYDRAULIC CONTROL PANEL IN CENTER OF ROOM UMBILICAL MAST PUMP ROOM (109), LSB (BDLG. 770), FACING WEST - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  9. 108. ACCUMULATORS AT LOWER RIGHT SIDE OF HYDRAULIC CONTROL PANEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    108. ACCUMULATORS AT LOWER RIGHT SIDE OF HYDRAULIC CONTROL PANEL IN UMBILICAL MAST PUMP ROOM (109), LSB (BLDG. 770) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  10. INTERIOR VIEW LOOKING NORTH, SHOWING GE CONTROL PANEL, RHEOSTATS AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR VIEW LOOKING NORTH, SHOWING GE CONTROL PANEL, RHEOSTATS AND METERS FOR NO. 2 FURNACE. METER TO THE LEFT IS WESTINGHOUSE. - Braeburn Alloy Steel, Braeburn Road at Allegheny River, Lower Burrell, Westmoreland County, PA

  11. 18. DETAIL OF MISSILE PRESSURIZATION CONTROL PANEL ON INTERIOR, EAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. DETAIL OF MISSILE PRESSURIZATION CONTROL PANEL ON INTERIOR, EAST SIDE, DECK LEVEL OF MST - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  12. 4. INGERSOLLRAND AMMONIA COMPRESSOR AND CONTROL PANEL INSIDE BUILDING 2; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. INGERSOLL-RAND AMMONIA COMPRESSOR AND CONTROL PANEL INSIDE BUILDING 2; LOOKING SOUTHWEST - Rath Packing Company, Engine Room, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  13. 15. INTERIOR DETAIL OF CONTROL PANEL IN BUILDING 1606. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. INTERIOR DETAIL OF CONTROL PANEL IN BUILDING 1606. VIEW TO NORTH. - Rocky Mountain Arsenal, Cluster Bomb Assembly-Filling-Storage Building, 3500 feet South of Ninth Avenue; 2870 feet East of D Street, Commerce City, Adams County, CO

  14. 14. INTERIOR DETAIL OF CONTROL PANEL IN BUILDING 1606. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. INTERIOR DETAIL OF CONTROL PANEL IN BUILDING 1606. VIEW TO SOUTH. - Rocky Mountain Arsenal, Cluster Bomb Assembly-Filling-Storage Building, 3500 feet South of Ninth Avenue; 2870 feet East of D Street, Commerce City, Adams County, CO

  15. 17. INTERIOR DETAIL OF CONTROL PANEL IN BUILDING 1606. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. INTERIOR DETAIL OF CONTROL PANEL IN BUILDING 1606. VIEW TO SOUTH. - Rocky Mountain Arsenal, Cluster Bomb Assembly-Filling-Storage Building, 3500 feet South of Ninth Avenue; 2870 feet East of D Street, Commerce City, Adams County, CO

  16. 16. INTERIOR DETAIL OF CONTROL PANEL IN BUILDING 1606. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. INTERIOR DETAIL OF CONTROL PANEL IN BUILDING 1606. VIEW TO SOUTHWEST. - Rocky Mountain Arsenal, Cluster Bomb Assembly-Filling-Storage Building, 3500 feet South of Ninth Avenue; 2870 feet East of D Street, Commerce City, Adams County, CO

  17. 6. INTERIOR VIEW WITH CONTROL PANEL FOR CUPOLA OPERATIONS WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. INTERIOR VIEW WITH CONTROL PANEL FOR CUPOLA OPERATIONS WITH GREY IRON CUPOLA FOREMAN, DAVID CAMP REDMAN. REDMAN IS A THIRD GENERATION STOCKHAM EMPLOYEE. - Stockham Pipe & Fittings Company, Grey Iron Foundry, 4000 Tenth Avenue North, Birmingham, Jefferson County, AL

  18. 17. Rear (west) side of incinerator. Incinerator control panel on ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Rear (west) side of incinerator. Incinerator control panel on the right. Looking south towards scrubber cell. - Plutonium Finishing Plant, Waste Incinerator Facility, 200 West Area, Richland, Benton County, WA

  19. 3. GENERAL VIEW OF BOILER ROOM, LOOKING NORTH; CONTROL PANEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. GENERAL VIEW OF BOILER ROOM, LOOKING NORTH; CONTROL PANEL AT CENTER; BOXLIKE, RIVETED HOUSING AT TOP CENTER CONTAINED AUGER FOR COAL DISTRIBUTION SYSTEM - Rath Packing Company, Boiler Room, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  20. Detail of generator number three, oblique. Control panels on the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail of generator number three, oblique. Control panels on the main floor and on the mezzanine are visible behind and above the generators. - March Air Force Base, Strategic Air Command, Utility Building, 5220 Riverside Drive, Moreno Valley, Riverside County, CA

  1. 11. METALCLAD CONTROL PANELS AND CABINETS, MAIN FLOOR LOOKING NORTH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. METAL-CLAD CONTROL PANELS AND CABINETS, MAIN FLOOR LOOKING NORTH - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  2. 54. LOCK, ELECTRICAL SYSTEM, CONTROL SWITCH CABINET, PANEL ARRANGEMENT AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    54. LOCK, ELECTRICAL SYSTEM, CONTROL SWITCH CABINET, PANEL ARRANGEMENT AND DETAILS. February 1938 - Mississippi River 9-Foot Channel Project, Lock & Dam No. 17, Upper Mississippi River, New Boston, Mercer County, IL

  3. 22. PHOTOCOPY OF PHOTOGRAPH. View north of main control panels, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. PHOTOCOPY OF PHOTOGRAPH. View north of main control panels, Artic and Tropic Chambers, ca. 1955. (Source: NRDEC). - Natick Research & Development Laboratories, Climatic Chambers Building, U.S. Army Natick Research, Development & Engineering Center (NRDEC), Natick, Middlesex County, MA

  4. 15. View northeast of main control panels, Arctic and Tropic ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. View northeast of main control panels, Arctic and Tropic Chambers, in machine area. - Natick Research & Development Laboratories, Climatic Chambers Building, U.S. Army Natick Research, Development & Engineering Center (NRDEC), Natick, Middlesex County, MA

  5. 133. NITROGEN SUPPLY PANEL ON SOUTH WALL OF CONTROL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    133. NITROGEN SUPPLY PANEL ON SOUTH WALL OF CONTROL ROOM (114), LSB (BLDG. 770) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  6. 27. STATIC TEST TOWER CLOSEUP VIEW OF CONTROL PANEL AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. STATIC TEST TOWER CLOSE-UP VIEW OF CONTROL PANEL AT REAR OF TOWER UNDER SHED ROOF. - Marshall Space Flight Center, Saturn Propulsion & Structural Test Facility, East Test Area, Huntsville, Madison County, AL

  7. DETAIL VIEW OF HYDRAULICS CONTROL PANEL IN ROOM 16B ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF HYDRAULICS CONTROL PANEL IN ROOM 16B - Cape Canaveral Air Force Station, Launch Complex 39, Mobile Launcher Platforms, Launcher Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  8. Compact Active Vibration Control System for a Flexible Panel

    NASA Technical Reports Server (NTRS)

    Schiller, Noah H. (Inventor); Cabell, Randolph H. (Inventor); Perey, Daniel F. (Inventor)

    2014-01-01

    A diamond-shaped actuator for a flexible panel has an inter-digitated electrode (IDE) and a piezoelectric wafer portion positioned therebetween. The IDE and/or the wafer portion are diamond-shaped. Point sensors are positioned with respect to the actuator and measure vibration. The actuator generates and transmits a cancelling force to the panel in response to an output signal from a controller, which is calculated using a signal describing the vibration. A method for controlling vibration in a flexible panel includes connecting a diamond-shaped actuator to the flexible panel, and then connecting a point sensor to each actuator. Vibration is measured via the point sensor. The controller calculates a proportional output voltage signal from the measured vibration, and transmits the output signal to the actuator to substantially cancel the vibration in proximity to each actuator.

  9. 46 CFR 161.002-12 - Manual fire alarm systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (a) General. A manual fire alarm system shall consist of a power supply, a control unit on which are... the control unit and terminating at manual fire alarm boxes. Power failure alarm devices may be... alarm system control unit. The manual fire alarm system control unit shall be as specified for...

  10. Working toward the elimination of residential fire deaths: the Centers for Disease Control and Prevention's Smoke Alarm Installation and Fire Safety Education (SAIFE) program.

    PubMed

    Ballesteros, Michael F; Jackson, Mark L; Martin, Maurice W

    2005-01-01

    To address residential fires and related injuries, the Centers for Disease Control and Prevention funds state health departments to deliver a Smoke Alarm Installation and Fire Safety Education (SAIFE) program in high-risk homes in 16 states. This program involves recruiting local communities and community partners, hiring a local coordinator, canvassing neighborhood homes, installing long-lasting lithium-powered smoke alarms, and providing general fire safety education and 6-month follow-up to determine alarm functionality. Local fire departments are vital community partners in delivering this program. Since the program's inception, more than 212,000 smoke alarms have been installed in more than 126,000 high-risk homes. Additionally, approximately 610 lives have potentially been saved as a result of a program alarm that provided early warning to a dangerous fire incident. PMID:16151290

  11. HOME INSECURITY: NO ALARMS, FALSE ALARMS, AND SIGINT

    SciTech Connect

    Lamb, Logan M

    2014-01-01

    The market share of home security systems has substantially increased as vendors incorporate more desirable features: intrusion detection, automation, wireless, and LCD touch panel controls. Wireless connectivity allows vendors to manufacture cheaper, more featureful products that require little to no home modification to install. Consumer win, since adding devices is easier. The result: an ostensibly more secure, convenient, and connected home for a larger number of citizens. Sadly, this hypothesis is flawed; the idea of covering a home with more security sensors does not translate into a more secure home. Additionally, the number of homes using these vulnerable systems is large, and the growth rate is increasing producing a even larger problem. In this talk, I will demonstrate a generalized approach for compromising three systems: ADT, the largest home security dealer in North America; Honeywell, one of the largest manufacturers of security devices; and Vivint, a top 5 security dealer. We will suppress alarms, create false alarms, and collect artifacts that facilitate tracking the movements of individuals in their homes.

  12. Dynamic alarm response procedures

    SciTech Connect

    Martin, J.; Gordon, P.; Fitch, K.

    2006-07-01

    The Dynamic Alarm Response Procedure (DARP) system provides a robust, Web-based alternative to existing hard-copy alarm response procedures. This paperless system improves performance by eliminating time wasted looking up paper procedures by number, looking up plant process values and equipment and component status at graphical display or panels, and maintenance of the procedures. Because it is a Web-based system, it is platform independent. DARP's can be served from any Web server that supports CGI scripting, such as Apache{sup R}, IIS{sup R}, TclHTTPD, and others. DARP pages can be viewed in any Web browser that supports Javascript and Scalable Vector Graphics (SVG), such as Netscape{sup R}, Microsoft Internet Explorer{sup R}, Mozilla Firefox{sup R}, Opera{sup R}, and others. (authors)

  13. Field evaluation of potential of alarm pheromone compounds to enhance baits for control of grass-cutting ants (Hymenoptera: Formicidae).

    PubMed

    Hughes, William O H; Howse, Philip E; Vilela, Evaldo F; Knapp, Jenny J; Goulson, Dave

    2002-06-01

    Leaf-cutting ants are important economic pests of the Neotropics, and the most common method of control involves the use of insecticidal baits. Baits that are currently available exhibit low attractiveness to grass-cutting species, thus there is a need to develop improved baits. The potential for using alarm pheromone compounds to enhance the attractiveness and subsequent harvest of baits was examined for two economically important species of grass-cutting ant, Atta bisphaerica (Forel) and Atta capiguara (Goncalves). Compounds of the alarm pheromone were applied to rubber septa that were then sealed inside plastic sachets together with citrus pulp-based bait. The best candidate compound for bait enhancement was 4-methyl-3-heptanone. This compound significantly increased the attractiveness of bait sachets to both species. It also appeared to improve the discovery of nearby unenhanced sachets. However, 4-methyl-3-heptanone resulted in only a slight and non-significant improvement in bait harvest. Enhanced and unenhanced bait sachets were applied at a number of positions to obtain an improvement in harvest, but without success. The possible reasons for the lack of an enhancement of harvest and the potential for using alarm pheromone compounds as leaf-cutting ant bait enhancers are discussed. PMID:12075997

  14. 25. LOOKING SOUTH AT THE MAIN CONTROL PANEL FOR BASIC ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. LOOKING SOUTH AT THE MAIN CONTROL PANEL FOR BASIC OXYGEN FURNACE No. 1 IN THE BOP SHOP'S No. 1 CONTROL ROOM ON THE OPERATING FLOOR OF THE FURNACE AISLE. - U.S. Steel Duquesne Works, Basic Oxygen Steelmaking Plant, Along Monongahela River, Duquesne, Allegheny County, PA

  15. 26. LOOKING SOUTH AT THE MOTOR CONTROL SWITCHING PANEL FOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. LOOKING SOUTH AT THE MOTOR CONTROL SWITCHING PANEL FOR BASIC OXYGEN FURNACE No. 2 IN THE BOP SHOP'S MOTOR CONTROL CENTER No. 2 ON THE GROUND FLOOR OF THE FURNACE AISLE. - U.S. Steel Duquesne Works, Basic Oxygen Steelmaking Plant, Along Monongahela River, Duquesne, Allegheny County, PA

  16. 62. View of amplifiermodulator control system with power distribution panel ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    62. View of amplifier-modulator control system with power distribution panel on left, control power supply in middle, and amplifier modulator on right, second floor in transmitter building no. 102. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  17. 60. Shock isolator at center, pneumatic control group panel at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    60. Shock isolator at center, pneumatic control group panel at left, power distribution box at right, all at right of entrance to lcc. - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD

  18. 72. DETAIL OF PAYLOAD ENVIRONMENTAL CONTROL AND MONITORING PANELS (PECMP) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    72. DETAIL OF PAYLOAD ENVIRONMENTAL CONTROL AND MONITORING PANELS (PECMP) LOCATED AT WEST END OF LONG CONSOLE NEAR NORTHEAST CORNER OF SLC-3E CONTROL ROOM - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  19. Controlling misses and false alarms in a machine learning framework for predicting uniformity of printed pages

    NASA Astrophysics Data System (ADS)

    Nguyen, Minh Q.; Allebach, Jan P.

    2015-01-01

    In our previous work1 , we presented a block-based technique to analyze printed page uniformity both visually and metrically. The features learned from the models were then employed in a Support Vector Machine (SVM) framework to classify the pages into one of the two categories of acceptable and unacceptable quality. In this paper, we introduce a set of tools for machine learning in the assessment of printed page uniformity. This work is primarily targeted to the printing industry, specifically the ubiquitous laser, electrophotographic printer. We use features that are well-correlated with the rankings of expert observers to develop a novel machine learning framework that allows one to achieve the minimum "false alarm" rate, subject to a chosen "miss" rate. Surprisingly, most of the research that has been conducted on machine learning does not consider this framework. During the process of developing a new product, test engineers will print hundreds of test pages, which can be scanned and then analyzed by an autonomous algorithm. Among these pages, most may be of acceptable quality. The objective is to find the ones that are not. These will provide critically important information to systems designers, regarding issues that need to be addressed in improving the printer design. A "miss" is defined to be a page that is not of acceptable quality to an expert observer that the prediction algorithm declares to be a "pass". Misses are a serious problem, since they represent problems that will not be seen by the systems designers. On the other hand, "false alarms" correspond to pages that an expert observer would declare to be of acceptable quality, but which are flagged by the prediction algorithm as "fails". In a typical printer testing and development scenario, such pages would be examined by an expert, and found to be of acceptable quality after all. "False alarm" pages result in extra pages to be examined by expert observers, which increases labor cost. But "false

  20. 75 FR 77645 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Pregnancy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... Control Special Emphasis Panel (SEP): Pregnancy Risk Assessment Monitoring System (PRAMS), DP11-001 Panel..., discussion, and evaluation of ``Pregnancy Risk Assessment Monitoring System (PRAMS), DP11-001 Panel...

  1. 76 FR 5379 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Pregnancy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-31

    ... Control Special Emphasis Panel (SEP): Pregnancy Risk Assessment Monitoring System (PRAMS), DP11-001 Panels... Risk Assessment Monitoring System (PRAMS), DP11-001 Panels A, B, and C.'' Contact Person for...

  2. SPERTI Control Building (PER601) interior. Control panel with data readout ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SPERT-I Control Building (PER-601) interior. Control panel with data readout equipment in control room. Panels and equipment were fabricated elsewhere at NRTS during SPERT-I construction. Photographer: R.G. Larsen. Date: November 21, 1955. INEEL negative no. 55-3208 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  3. 26. DETAIL OF CONTROL PANEL FOR TELEVISION CAMERAS LOCATED AROUND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. DETAIL OF CONTROL PANEL FOR TELEVISION CAMERAS LOCATED AROUND SLC-3W. LABELS INDICATE LOCATIONS OF CAMERAS AND CORRESPOND TO LABELS ON MONITORS IN PHOTOS A-33 AND A-34. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  4. VIEW OF CONTROL PANEL (RIGHT) AT THE GROUND FLOOR LEVEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF CONTROL PANEL (RIGHT) AT THE GROUND FLOOR LEVEL AND SIDE OF THE MISSILE TUBE (FOREGROUND). VIEW FACING EAST - U.S. Naval Base, Pearl Harbor, Ford Island Polaris Missile Lab & U.S. Fleet Ballistic Missile Submarine Training Center, Between Lexington Boulvevard and the sea plane ramps on the southwest side of Ford Island, Pearl City, Honolulu County, HI

  5. 37. INTERIOR, SHOWING BALCONY ABOVE CONTROL PANEL, AND BELTDRIVEN LATHE. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. INTERIOR, SHOWING BALCONY ABOVE CONTROL PANEL, AND BELT-DRIVEN LATHE. EEC print no. G-C-01-00095, no date. Photograph by Benjamin F. Pearson. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA

  6. 7. CONSTRUCTION PROGRESS VIEW (INTERIOR) OF CONTROL ROOM PANEL INSIDE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. CONSTRUCTION PROGRESS VIEW (INTERIOR) OF CONTROL ROOM PANEL INSIDE BUNKER. SHOWS OPENING TO CABLE CHASE, FOUR PULLEY DEVICES, POWER OUTLET, CONDUIT, AND EAST END WALL OF BUNKER. INEL PHOTO NUMBER 65-5441, TAKEN OCTOBER 20, 1965. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID

  7. 12. CONTROL PANELS, WEST SIDE (LEFT & RIGHT), MAIN FLOOR: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. CONTROL PANELS, WEST SIDE (LEFT & RIGHT), MAIN FLOOR: CENTER OF CLUSTERS, TOP BOX: MEGAWATT METER CENTER OF CLUSTERS, LOWER THREE BOXES: AMPERE METERS LEFT SIDE OF CLUSTERS: VOLTAGE CHART RECORDER RIGHT SIDE OF CLUSTERS: RECLOSE RELAY CENTER UNDER CLUSTERS: TESTING SWITCHES BELOW TESTING SWITCHES: BREAKER SWITCHES - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  8. 22. VIEW, LOOKING EASTSOUTHEAST, SHOWING CONTROLLER PANEL AT EXTREME LEFT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. VIEW, LOOKING EAST-SOUTHEAST, SHOWING CONTROLLER PANEL AT EXTREME LEFT, EMERGENCY HAND BRAKE, REDUCTION GEAR HOUSING FROM WHICH PROTRUDES MAIN PULLEY SHAFT, AND LIFT SPAN HEIGHT INDICATOR AT CENTER - Sacramento River Bridge, Spanning Sacramento River at California State Highway 275, Sacramento, Sacramento County, CA

  9. 6. Interior view of control panels on wall of the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Interior view of control panels on wall of the signal transfer room on the west side of the Signal Transfer Building (T-28A). - Air Force Plant PJKS, Systems Integration Laboratory, Signal Transfer Building, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  10. 19. VIEW OF THE PLATING BATHS AND CONTROL PANELS. GOLD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. VIEW OF THE PLATING BATHS AND CONTROL PANELS. GOLD AND SILVER WERE AMONG THE MATERIALS PLATED ONTO PARTS MADE OF COPPER, STAINLESS STEEL AND STEEL. (11/15/89) - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO

  11. SonoPanel(TM) 1-3 Piezocomposite Panels for Active Surface Control

    NASA Technical Reports Server (NTRS)

    Gentilman, R.; Bowen, L.; Fiore, D.; Pham, H.; Serwatka, W.

    1996-01-01

    Materials Systems Inc. has developed a cost-effective technology for producing 1-3 piezoelectric ceramic/polymer composites for use in active surface control. MSI's 103 piezocomposite SonoPanel(TM) transducers consist of an array of piezoelectric ceramic rods arranged in a compliant polymer matrix. The standard SonoPanel(TM) composite consists of 15 volume percent PZT-5H rods 1.1 mm diameter x 6.3 mm long in a matrix of soft polyurethane. Stiff face plates are then bonded to the 1-3 composite sheet for stress amplification when used as a sensor and to enhance the surface response uniformity when used as an actuator. Many variations on this composite design have been produced for specific application requirements.

  12. Impact of aphid alarm pheromone release on virus transmission efficiency: When pest control strategy could induce higher virus dispersion.

    PubMed

    Lin, Fang-Jing; Bosquée, Emilie; Liu, Ying-Jie; Chen, Ju-Lian; Yong, Liu; Francis, Frédéric

    2016-09-01

    Aphids cause serious damages to crops not only by tacking sap but also by transmitting numerous viruses. To develop biological control, the aphid alarm pheromone, namely E-β-farnesene (EβF), has been demonstrated to be efficient to repel aphids and as attract beneficials, making it a potential tool to control aphid pests. Considering aphids also as virus vectors, changes of their behavior could also interfere with the virus acquisition and transmission process. Here, a combination of two aphid species and two potato virus models were selected to test the influence of EβF release on aphid and virus dispersion under laboratory conditions. EβF release was found to significantly decrease the population of Myzus persicae and Macrosiphum euphorbiae around the infochemical releaser but simultaneously also increasing the dispersal of Potato Virus Y (PVY). At the opposite, no significant difference for Potato Leaf Roll Virus (PLRV) transmission efficiency was observed with similar aphid alarm pheromone releases for none of the aphid species. These results provide some support to carefully consider infochemical releasers not only for push-pull strategy and pest control but also to include viral disease in a the plant protection to aphids as they are also efficient virus vectors. Impact of aphid kinds and transmission mechanisms will be discussed according to the large variation found between persistent and non persistent potato viruses and interactions with aphids and related infochemicals. PMID:27185564

  13. Piezoceramic Actuator Placement for Acoustic Control of Panels

    NASA Technical Reports Server (NTRS)

    Bevan, Jeffrey S.

    2000-01-01

    Optimum placement of multiple traditional piezoceramic actuators is determined for active structural acoustic control of flat panels. The structural acoustic response is determined using acoustic radiation filters and structural surface vibration characteristics. Linear Quadratic Regulator (LQR) control is utilized to determine the optimum state feedback gain for active structural acoustic control. The optimum actuator location is determined by minimizing the structural acoustic radiated noise using a modified genetic algorithm. Experimental tests are conducted and compared to analytical results. Anisotropic piezoceramic actuators exhibit enhanced performance when compared to traditional isotropic piezoceramic actuators. As a result of the inherent isotropy, these advanced actuators develop strain along the principal material axis. The orientation of anisotropic actuators is investigated on the effect of structural vibration and acoustic control of curved and flat panels. A fully coupled shallow shell finite element formulation is developed to include anisotropic piezoceramic actuators for shell structures.

  14. Piezoceramic Actuator Placement for Acoustic Control of Panels

    NASA Technical Reports Server (NTRS)

    Bevan, Jeffrey S.; Turner, Travis L. (Technical Monitor)

    2001-01-01

    Optimum placement of multiple traditional piezoceramic actuators is determined for active structural acoustic control of flat panels. The structural acoustic response is determined using acoustic radiation filters and structural surface vibration characteristics. Linear Quadratic Regulator (LQR) control is utilized to determine the optimum state feedback gain for active structural acoustic control. The optimum actuator location is determined by minimizing the structural acoustic radiated noise using a modified genetic algorithm. Experimental tests are conducted and compared to analytical results. Anisotropic piezoceramic actuators exhibits enhanced performance when compared to traditional isotropic piezoceramic actuators. As a result of the inherent isotropy, these advanced actuators develop strain along the principal material axis. The orientation of anisotropic actuators is investigated on the effect of structural vibration and acoustic control of curved and flat panels. A fully coupled shallow shell finite element formulation is developed to include anisotropic piezoceramic actuators for shell structures.

  15. Talking Fire Alarms Calm Kids.

    ERIC Educational Resources Information Center

    Executive Educator, 1984

    1984-01-01

    The new microprocessor-based fire alarm systems can help to control smoke movement throughout school buildings by opening vents and doors, identify the burning section, activate voice alarms, provide firefighters with telephone systems during the fire, and release fire-preventing gas. (KS)

  16. The Best Ever Alarm System Toolkit

    SciTech Connect

    Kasemir, Kay; Chen, Xihui; Danilova, Katia

    2009-01-01

    Learning from our experience with the standard Experimental Physics and Industrial Control System (EPICS) alarm handler (ALH) as well as a similar intermediate approach based on script-generated operator screens, we developed the Best Ever Alarm System Toolkit (BEAST). It is based on Java and Eclipse on the Control System Studio (CSS) platform, using a relational database (RDB) to store the configuration and log actions. It employs a Java Message Service (JMS) for communication between the modular pieces of the toolkit, which include an Alarm Server to maintain the current alarm state, an arbitrary number of Alarm Client user interfaces (GUI), and tools to annunciate alarms or log alarm related actions. Web reports allow us to monitor the alarm system performance and spot deficiencies in the alarm configuration. The Alarm Client GUI not only gives the end users various ways to view alarms in tree and table, but also makes it easy to access the guidance information, the related operator displays and other CSS tools. It also allows online configuration to be simply modified from the GUI. Coupled with a good "alarm philosophy" on how to provide useful alarms, we can finally improve the configuration to achieve an effective alarm system.

  17. 28. A typical main control panel in a 105 reactor ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. A typical main control panel in a 105 reactor building, in this case 105-F in February 1945. A single operator sat at the controls to regulate the pile's rate of reaction and monitor it for safety. The galvanometer screens (the two horizontal bars just below the nine round gauges that showed the positions of the control rods) showed the pile's current power setting. With that information, the operator could set the control rod positions to increase, decrease, or maintain the power. D-8310 - B Reactor, Richland, Benton County, WA

  18. 77 FR 2549 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Grants for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Grants for Injury Control Research Centers (Panel 3), Funding... Control Research Centers, Panel 3, FOA CE12-001.'' Contact Person for More Information: Donald...

  19. 77 FR 62240 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel: Notice of Charter...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-12

    ... Control Special Emphasis Panel: Notice of Charter Renewal This gives notice under the Federal Advisory... Control Special Emphasis Panel, Centers for Disease Control and Prevention, Department of Health and Human... Emphasis Panel, Centers for Disease Control and Prevention, Department of Health and Human Services,...

  20. 46 CFR 78.47-13 - Fire detecting and manual alarm, automatic sprinkler, and smoke detecting alarm bells.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... § 78.47-13 Fire detecting and manual alarm, automatic sprinkler, and smoke detecting alarm bells. (a) The fire detecting and manual alarm automatic sprinklers, and smoke detecting alarm bells in the... “SMOKE DETECTING ALARM” as appropriate. Where such alarms on the bridge or in the fire control station...

  1. 46 CFR 78.47-13 - Fire detecting and manual alarm, automatic sprinkler, and smoke detecting alarm bells.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... § 78.47-13 Fire detecting and manual alarm, automatic sprinkler, and smoke detecting alarm bells. (a) The fire detecting and manual alarm automatic sprinklers, and smoke detecting alarm bells in the... “SMOKE DETECTING ALARM” as appropriate. Where such alarms on the bridge or in the fire control station...

  2. 46 CFR 78.47-13 - Fire detecting and manual alarm, automatic sprinkler, and smoke detecting alarm bells.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... § 78.47-13 Fire detecting and manual alarm, automatic sprinkler, and smoke detecting alarm bells. (a) The fire detecting and manual alarm automatic sprinklers, and smoke detecting alarm bells in the... “SMOKE DETECTING ALARM” as appropriate. Where such alarms on the bridge or in the fire control station...

  3. 46 CFR 78.47-13 - Fire detecting and manual alarm, automatic sprinkler, and smoke detecting alarm bells.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... § 78.47-13 Fire detecting and manual alarm, automatic sprinkler, and smoke detecting alarm bells. (a) The fire detecting and manual alarm automatic sprinklers, and smoke detecting alarm bells in the... “SMOKE DETECTING ALARM” as appropriate. Where such alarms on the bridge or in the fire control station...

  4. 46 CFR 78.47-13 - Fire detecting and manual alarm, automatic sprinkler, and smoke detecting alarm bells.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... § 78.47-13 Fire detecting and manual alarm, automatic sprinkler, and smoke detecting alarm bells. (a) The fire detecting and manual alarm automatic sprinklers, and smoke detecting alarm bells in the... “SMOKE DETECTING ALARM” as appropriate. Where such alarms on the bridge or in the fire control station...

  5. 14. CONTROL PANELS, EAST SIDE, MAIN FLOOR: TO LEFT (ORIGINAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. CONTROL PANELS, EAST SIDE, MAIN FLOOR: TO LEFT (ORIGINAL EQUIPMENT): UPPER FOUR GLASS BOXES ARE OVERCURRENT PROTECTIVE RELAYS; MIDDLE FOUR GLASS BOXES CONTAIN TESTING SWITCHES; LOWER TWO BOXES ARE DG1 METERING CHART RECORDERS TO RIGHT (MODERN EQUIPMENT): UPPER FOUR BLACK BOXES ARE PROTECTIVE SERVICE RELAYS; MIDDLE FOUR BOXES CONTAIN TESTING SWITCHES; LARGE BOX BELOW HOUSES REMOTE METERING SYSTEM METAL CABINETS (LABELED L-2 & L-4) BELOW CONTAIN ORIGINAL POWER CIRCUIT BREAKERS - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR

  6. Beyond control panels: direct manipulation for visual analytics.

    PubMed

    Endert, Alex; Bradel, Lauren; North, Chris

    2013-01-01

    To tackle the onset of big data, visual analytics seeks to marry the human intuition of visualization with mathematical models' analytical horsepower. A critical question is, how will humans interact with and steer these complex models? Initially, users applied direct manipulation to such models the same way they applied it to simpler visualizations in the premodel era--using control panels to directly manipulate model parameters. However, opportunities are arising for direct manipulation of the model outputs, where the users' thought processes take place, rather than the inputs. This article presents this new agenda for direct manipulation for visual analytics. PMID:24808054

  7. 78 FR 66937 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-07

    ... Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Capacity...), the Centers for Disease Control and Prevention (CDC) announces the aforementioned SEP: Times and...

  8. 78 FR 57391 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ... Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Capacity...), the Centers for Disease Control and Prevention (CDC) announces the aforementioned SEP: Times and...

  9. Virtual Design Method for Controlled Failure in Foldcore Sandwich Panels

    NASA Astrophysics Data System (ADS)

    Sturm, Ralf; Fischer, S.

    2015-12-01

    For certification, novel fuselage concepts have to prove equivalent crashworthiness standards compared to the existing metal reference design. Due to the brittle failure behaviour of CFRP this requirement can only be fulfilled by a controlled progressive crash kinematics. Experiments showed that the failure of a twin-walled fuselage panel can be controlled by a local modification of the core through-thickness compression strength. For folded cores the required change in core properties can be integrated by a modification of the fold pattern. However, the complexity of folded cores requires a virtual design methodology for tailoring the fold pattern according to all static and crash relevant requirements. In this context a foldcore micromodel simulation method is presented to identify the structural response of a twin-walled fuselage panels with folded core under crash relevant loading condition. The simulations showed that a high degree of correlation is required before simulation can replace expensive testing. In the presented studies, the necessary correlation quality could only be obtained by including imperfections of the core material in the micromodel simulation approach.

  10. IMPEDANCE ALARM SYSTEM

    DOEpatents

    Cowen, R.G.

    1959-09-29

    A description is given of electric protective systems and burglar alarm systems of the capacitance type in which the approach of an intruder at a place to be protected varies the capacitance in an electric circuit and the change is thereafter communicated to a remote point to actuate an alarm. According to the invention, an astable transitor multi-vibrator has the amplitude at its output voltage controlled by a change in the sensing capacitance. The sensing capacitance is effectively connected between collector and base of one stage of the multivibrator circuit through the detector-to-monitor line. The output of the detector is a small d-c voltage across the detector-to-monitor line. This d- c voltage is amplified and monitored at the other end of the line, where an appropriate alarm is actuated if a sudden change in the voltage occurs. The present system has a high degree of sensitivity and is very difficult to defeat by known techniques.

  11. Development of the technology for the fabrication of reliable laminar from control panels

    NASA Technical Reports Server (NTRS)

    Meade, L. E.; Kays, A. O.; Ferrill, R. S.; Young, H. R.

    1977-01-01

    Materials were assessed and fabrication techniques were developed for use in the manufacture of wing surface materials compatible with the application of both aluminum alloys and nonmetallic composites. The concepts investigated included perforations and slots in the metallic test panels and microporosity and perforations in the composite test panels. Perforations were produced in the metallic test panels by the electron beam process and slots were developed by controlled gaps between the metal sheets. Microporosity was produced in the composite test panels by the resin bleed process, and perforations were produced by the fugitive fiber technique. Each of these concepts was fabricated into test panels, and air flow tests were conducted on the panels.

  12. Fuselage panel noise attenuation by piezoelectric switching control

    NASA Astrophysics Data System (ADS)

    Makihara, Kanjuro; Miyakawa, Takeya; Onoda, Junjiro; Minesugi, Kenji

    2010-08-01

    This paper describes a problem that we encountered in our noise attenuation project and our solution for it. We intend to attenuate low-frequency noise that transmits through aircraft fuselage panels. Our method of noise attenuation is implemented with a piezoelectric semi-active system having a selective switch instead of an active energy-supply system. The semi-active controller is based on the predicted sound pressure distribution obtained from acoustic emission analysis. Experiments and numerical simulations demonstrate that the semi-active method attenuates acoustic levels of not only the simple monochromatic noise but also of broadband noise. We reveal that tuning the electrical parameters in the circuit is the key to effective noise attenuation, to overcome the acoustic excitation problem due to sharp switching actions, as well as to control chattering problems. The results obtained from this investigation provide meaningful insights into designing noise attenuation systems for comfortable aircraft cabin environments.

  13. 46 CFR 169.732 - Carbon dioxide alarm.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Carbon dioxide alarm. 169.732 Section 169.732 Shipping... Control, Miscellaneous Systems, and Equipment Markings § 169.732 Carbon dioxide alarm. Each carbon dioxide alarm must be conspicuously identified: “WHEN ALARM SOUNDS—VACATE AT ONCE. CARBON DIOXIDE BEING RELEASED.”...

  14. 46 CFR 169.732 - Carbon dioxide alarm.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Carbon dioxide alarm. 169.732 Section 169.732 Shipping... Control, Miscellaneous Systems, and Equipment Markings § 169.732 Carbon dioxide alarm. Each carbon dioxide alarm must be conspicuously identified: “WHEN ALARM SOUNDS—VACATE AT ONCE. CARBON DIOXIDE BEING RELEASED.”...

  15. 76 FR 13414 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel: Continuation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... Control Special Emphasis Panel: Continuation of the National Mesothelioma Virtual Bank for Translational... initial review, discussion, and evaluation of ``Continuation of the National Mesothelioma Virtual Bank...

  16. 76 FR 12122 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): The...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Control Special Emphasis Panel (SEP): The Association of Genetic Biomarkers and Hereditary Hemochromatosis... of the Director, Extramural Research Program Office, 4770 Buford Highway, NE., Mailstop K-92,...

  17. 75 FR 13769 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Natural...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... Control Special Emphasis Panel (SEP): Natural Experiments and Effectiveness Studies To Identify the Best..., discussion, and evaluation of ``Natural Experiments and Effectiveness Studies to Identify the Best Policy...

  18. 75 FR 78999 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Centers for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... Control Special Emphasis Panel (SEP): Centers for Autism and Developmental Disabilities Research and... Discussed: The meeting will include the initial review, discussion, and evaluation of ``Centers for...

  19. 76 FR 27327 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Combining...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-11

    ... Control Special Emphasis Panel (SEP): Combining Subjective and Objective Methods for Quantifying Contact... 3, 2011 (Closed). Place: Teleconference. Contact Person For More Information: Gregory Anderson,...

  20. CBC Control Panel (Closed Brayton Cycle Control System) v 1.0

    2012-09-13

    The CBC Control Panel is a LabviewTM Virtual Interface program that performs data acquisition, displays this data (over 100 channels), and provides control mechanisms for Closed Brayton Cycle (CBC) power conversion systems. The Program uses a state point control method that transitions the CBC from an IDLE/OFF state to RUNNING state, to SHUTDOWN, and ultimately bac~ to IDLE/OFF. During each state a set of rules control the behavior of the machine.

  1. Beyond Control Panels: Direct Manipulation for Visual Analytics

    SciTech Connect

    Endert, Alexander; Bradel, Lauren; North, Chris

    2013-07-19

    Information Visualization strives to provide visual representations through which users can think about and gain insight into information. By leveraging the visual and cognitive systems of humans, complex relationships and phenomena occurring within datasets can be uncovered by exploring information visually. Interaction metaphors for such visualizations are designed to enable users direct control over the filters, queries, and other parameters controlling how the data is visually represented. Through the evolution of information visualization, more complex mathematical and data analytic models are being used to visualize relationships and patterns in data – creating the field of Visual Analytics. However, the expectations for how users interact with these visualizations has remained largely unchanged – focused primarily on the direct manipulation of parameters of the underlying mathematical models. In this article we present an opportunity to evolve the methodology for user interaction from the direct manipulation of parameters through visual control panels, to interactions designed specifically for visual analytic systems. Instead of focusing on traditional direct manipulation of mathematical parameters, the evolution of the field can be realized through direct manipulation within the visual representation – where users can not only gain insight, but also interact. This article describes future directions and research challenges that fundamentally change the meaning of direct manipulation with regards to visual analytics, advancing the Science of Interaction.

  2. 75 FR 7284 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-18

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Institutional Collaboration Between Liverpool School of Tropical Medicine and the Centers for Disease Control and Prevention on Malaria, Funding Opportunity...

  3. 75 FR 22816 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel: Revitalizing Core...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel: Revitalizing Core Environmental Health Programs Through the Environmental...), the Centers for Disease Control and Prevention (CDC), announces the aforementioned meeting: Times...

  4. Active Control of Turbulent Boundary Layer Induced Sound Radiation from Multiple Aircraft Panels

    NASA Technical Reports Server (NTRS)

    Gibbs, Gary P.; Cabell, Randolph H.

    2002-01-01

    The objective of this work is to experimentally investigate active structural acoustic control of turbulent boundary layer (TBL) induced sound radiation from multiple panels on an aircraft sidewall. One possible approach for controlling sound radiation from multiple panels is a multi-input/multi-output scheme which considers dynamic coupling between the panels. Unfortunately, this is difficult for more than a few panels, and is impractical for a typical aircraft which contains several hundred such panels. An alternative is to implement a large number of independent control systems. Results from the current work demonstrate the feasibility of reducing broadband radiation from multiple panels utilizing a single-input/single-output (SISO) controller per bay, and is the first known demonstration of active control of TBL induced sound radiation on more than two bays simultaneously. The paper compares sound reduction for fully coupled control of six panels versus independent control on each panel. An online adaptive control scheme for independent control is also demonstrated. This scheme will adjust for slow time varying dynamic systems such as fuselage response changes due to aircraft pressurization, etc.

  5. 75 FR 77645 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Pregnancy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Pregnancy Risk Assessment Monitoring System (PRAMS), DP11-001 Panel D, Initial Review In accordance...

  6. 75 FR 77645 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Pregnancy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Pregnancy Risk Assessment Monitoring System (PRAMS), DP11-001 Panel E, Initial Review In accordance...

  7. 30. DETAIL OF CONTROL PANEL FOR SLC3W MST ENVIRONMENTAL DOORS. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. DETAIL OF CONTROL PANEL FOR SLC-3W MST ENVIRONMENTAL DOORS. CONTROL PANEL LOCATED IN NORTHEAST CORNER OF STATION 70.5. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  8. 78 FR 24751 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Continuing Prospective Birth Cohort Study Involving Environmental Uranium Exposure in the Navajo Nation,...

  9. 77 FR 61756 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-11

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns...

  10. 78 FR 66937 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns...

  11. 78 FR 9926 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-12

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns...

  12. 78 FR 37542 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns...

  13. 78 FR 19490 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panels (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panels (SEP): Initial Review The meeting announced below concerns...

  14. 77 FR 36544 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns...

  15. 78 FR 60875 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns...

  16. 78 FR 60877 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-02

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns...

  17. 75 FR 52356 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel: National Human...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-25

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel: National Human Immunodeficiency Virus (HIV) Behavioral...

  18. 75 FR 46952 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): National Human Immunodeficiency Virus (HIV) Behavioral...

  19. 76 FR 9018 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Emerging...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-16

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Emerging Infections Sentinel Network (EISN) Research, Funding... initial review, discussion, and evaluation of applications received in response to ``Emerging...

  20. 46 CFR 130.470 - Fire alarms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Fire alarms. 130.470 Section 130.470 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.470 Fire alarms. (a)...

  1. 46 CFR 130.450 - Machinery alarms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Machinery alarms. 130.450 Section 130.450 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.450 Machinery alarms....

  2. 46 CFR 130.470 - Fire alarms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Fire alarms. 130.470 Section 130.470 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.470 Fire alarms. (a)...

  3. 46 CFR 130.470 - Fire alarms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Fire alarms. 130.470 Section 130.470 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.470 Fire alarms. (a)...

  4. 46 CFR 130.470 - Fire alarms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Fire alarms. 130.470 Section 130.470 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.470 Fire alarms. (a)...

  5. 46 CFR 130.450 - Machinery alarms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Machinery alarms. 130.450 Section 130.450 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.450 Machinery alarms....

  6. 46 CFR 130.450 - Machinery alarms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Machinery alarms. 130.450 Section 130.450 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.450 Machinery alarms....

  7. 46 CFR 130.450 - Machinery alarms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Machinery alarms. 130.450 Section 130.450 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.450 Machinery alarms....

  8. 46 CFR 130.470 - Fire alarms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Fire alarms. 130.470 Section 130.470 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.470 Fire alarms. (a)...

  9. 46 CFR 130.450 - Machinery alarms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Machinery alarms. 130.450 Section 130.450 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.450 Machinery alarms....

  10. 75 FR 30844 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Conducting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... Control Special Emphasis Panel (SEP): Conducting Public Health Research in Kenya (Panel B), Funding..., discussion, and evaluation of applications received in response to ``Conducting Public Health Research in... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH...

  11. 75 FR 28810 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Conducting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-24

    ... Control Special Emphasis Panel (SEP): Conducting Public Health Research in Kenya (Panel C), Funding..., discussion, and evaluation of applications received in response to ``Conducting Public Health Research in... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH...

  12. 75 FR 28622 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Conducting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... Control Special Emphasis Panel (SEP): Conducting Public Health Research in Kenya (U01)(Panel A), Funding..., discussion, and evaluation of applications received in response to ``Conducting Public Health Research in... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH...

  13. Nuclear power plant alarm systems: Problems and issues

    SciTech Connect

    O'Hara, J.M.; Brown, W.S.

    1991-01-01

    Despite the incorporation of advanced technology into nuclear power plant alarm systems, human factors problems remain. This paper identifies to be addressed in order to allow advanced technology to be used effectively in the design of nuclear power plant alarm systems. The operator's use and processing of alarm system information will be considered. Based upon a review of alarm system research, issues related to general system design, alarm processing, display and control are discussed. It is concluded that the design of effective alarm systems depends on an understanding of the information processing capabilities and limitations of the operator. 39 refs.

  14. Sound and vibration control tests of composite panel using piezoelectric sensors and actuators

    NASA Astrophysics Data System (ADS)

    Takahashi, Kosaku; Bansaku, Kazuhiro; Sanda, Tomio; Matsuzaki, Yuji

    2001-08-01

    We are carried out the tests for the sound and vibration control of the CFRP square panel. 500Hz bandwidth noise through two speakers is applied to the CFRP panel. Our objects are to improve the structural damping of the panel and attenuate the sound power radiated from the panel using piezoelectric sensors and actuators. The dimensions of the CFRP plate are 600.0 mm x 600.0mm in area and 1.8mmt in thickness. Eighteen piezoelectric elements (40.0 x 20.0 x 0.3mmt) are bonded on the surface of the panel by epoxy adhesive. The panel is driven using some piezoelectric elements as actuators. The vibration of the panel is monitored using piezoelectric elements as sensors. We can get the strain of the panel from the voltage induced by piezoelectric elements. The signals are sent to digital signal processor (DSP) through filters and the control signal are sent to the power amplifiers. The amplified signals drive the piezoelectric actuators. The vibration and the radiated sound power of the panel are suppressed. We try to apply two methods for the control which are the gain control and the reduced LQG control. In the case of the gain control, the strain is reduced as much as 10-20 dB at some resonant peaks and the radiated sound pressure level as much as 1-15 dB. The radiated sound power is reduced by 1.59dB in the 0-500Hz frequency range. In the case of the LQG control, the strain is reduced as much as 7-10dB at some resonant peaks and the radiated sound pressure level as much as 1-7dB. The radiated sound power is reduced by 0.7dB in the 0-500Hz frequency range.

  15. 76 FR 4911 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Centers of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... Control Special Emphasis Panel (SEP): Centers of Excellence To Promote a Healthier Workforce, Request for... Excellence to Promote a Healthier Workforce, RFA OH11-001.'' Contact Person for More Information:...

  16. 75 FR 12243 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Translating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ... Control Special Emphasis Panel (SEP): Translating Research Into Healthy Eye and Vision Loss Prevention... Research into Healthy Eye and Vision Loss Prevention, RFA DP 10- 004.'' Contact Person for More...

  17. 76 FR 4911 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel: Building Capacity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... Control Special Emphasis Panel: Building Capacity for State-Based Occupational Health Surveillance... initial review, discussion, and evaluation of ``Building Capacity for State- Based Occupational Health... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH...

  18. 76 FR 3909 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Family...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-21

    ... Control Special Emphasis Panel (SEP): Family History and Diamond Blackfan Anemia, DD11- 010, Initial... ``Family History and Diamond Blackfan Anemia, DD11-010, initial review.'' Contact Person for...

  19. 78 FR 6329 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-30

    ... Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Birth Defects... received in response to ``Birth Defects Study to Evaluate Pregnancy exposureS (BD-STEPS), FOA...

  20. 77 FR 16232 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): A Pilot...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... Control Special Emphasis Panel (SEP): A Pilot Surveillance for High Impact/Low Prevalence Congenital and... review, discussion, and evaluation of applications received in response to ``A Pilot Surveillance...

  1. 75 FR 10490 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Member...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-08

    ... Control Special Emphasis Panel (SEP): Member Conflict Review, Program Announcement (PA) 07-318, Initial... review, discussion, and evaluation of ``Member Conflict Review, PA 07- 318.'' Contact Person for...

  2. 75 FR 22815 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... Control Special Emphasis Panel (SEP): Public Health Research on Craniofacial Malformation, Funding... review, discussion, and evaluation of applications received in response to ``Public Health Research on... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH...

  3. 75 FR 9606 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    ... Control Special Emphasis Panel (SEP): Public Health Research on Craniofacial Malformation, Funding... review, discussion, and evaluation of applications received in response to ``Public Health Research on... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH...

  4. 75 FR 9423 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Impact of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-02

    ... Control Special Emphasis Panel (SEP): Impact of Japanese Encephalitis Vaccination in Cambodia, Funding... Vaccination in Cambodia, FOA CK10-003.'' Contact Person for More Information: Gregory Anderson, M.S.,...

  5. 28. Pump Room interiorMain valve control panel with status indicators ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Pump Room interior-Main valve control panel with status indicators for main flooding/dewatering valves and gates. - Hunters Point Naval Shipyard, Drydock No. 4, East terminus of Palou Avenue, San Francisco, San Francisco County, CA

  6. TRITIUM LABORATORY, TRA666, INTERIOR. MAIN INSTRUMENT PANEL INSIDE CONTROL ROOM. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    TRITIUM LABORATORY, TRA-666, INTERIOR. MAIN INSTRUMENT PANEL INSIDE CONTROL ROOM. INL NEGATIVE NO. HD30-2-4. Mike Crane, Photographer, 6/2001 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  7. 75 FR 78999 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Maternal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... Control Special Emphasis Panel (SEP): Maternal Vitamin D Status and Preterm Birth, DP11-002, Initial... ``Maternal Vitamin D Status and Preterm Birth, DP11-002, initial review.'' Contact Person for...

  8. 76 FR 49771 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-11

    ... Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Special Interest Project (SIP), Systematic Review of Effective Community-based Interventions of Clinical Preventive... review, discussion, and evaluation of ``Systematic Review of Effective Community-based Interventions...

  9. Medical audible alarms: a review

    PubMed Central

    Edworthy, Judy

    2013-01-01

    Objectives This paper summarizes much of the research that is applicable to the design of auditory alarms in a medical context. It also summarizes research that demonstrates that false alarm rates are unacceptably high, meaning that the proper application of auditory alarm design principles are compromised. Target audience Designers, users, and manufacturers of medical information and monitoring systems that indicate when medical or other parameters are exceeded and that are indicated by an auditory signal or signals. Scope The emergence of alarms as a ‘hot topic’; an outline of the issues and design principles, including IEC 60601-1-8; the high incidence of false alarms and its impact on alarm design and alarm fatigue; approaches to reducing alarm fatigue; alarm philosophy explained; urgency in audible alarms; different classes of sound as alarms; heterogeneity in alarm set design; problems with IEC 60601-1-8 and ways of approaching this design problem. PMID:23100127

  10. Multiplex gastrointestinal pathogen panels: implications for infection control.

    PubMed

    Rand, Kenneth H; Tremblay, Elizabeth E; Hoidal, Mari; Fisher, Lori B; Grau, Katrina R; Karst, Stephanie M

    2015-06-01

    In the acute care hospital inpatient setting, there is a wide variety of causes for both infectious and noninfectious diarrhea. However, without molecular assays for the wide range of agents causing gastroenteritis, there is no reliable way to determine which individuals should be placed in contact precautions, as recommended by CDC. We tested 158 inpatient diarrheal stool specimens with the FilmArray GI Panel (BioFire Diagnostics, Salt Lake City, UT, USA) that had been stored at -70°C after testing negative by conventional methods for Clostridium difficile and/or rotavirus. We found that 22.2% had at least 1 other infectious agent detected, and 60% of these patients were never placed in appropriate isolation for a total of 109 patient-days. In addition, 20.3% of patients with negative GI panel results could have been removed from isolation. Use of multiplex gastrointestinal panels may improve decisions regarding patient isolation and reduce nosocomial transmission. PMID:25796558

  11. 30 CFR 57.4360 - Underground alarm systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground alarm systems. 57.4360 Section 57... MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Fire Prevention and Control Firefighting Procedures/alarms/drills § 57.4360 Underground alarm systems. (a) Fire...

  12. 46 CFR 169.731 - General alarm bells.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false General alarm bells. 169.731 Section 169.731 Shipping... Control, Miscellaneous Systems, and Equipment Markings § 169.731 General alarm bells. On vessels of 100 gross tons and over each general alarm bell must be identified by red lettering at least 1/2 inch...

  13. 46 CFR 169.730 - General alarm bell switch.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false General alarm bell switch. 169.730 Section 169.730... Vessel Control, Miscellaneous Systems, and Equipment Markings § 169.730 General alarm bell switch. On vessels of 100 gross tons and over there must be a general alarm bell switch in the pilothouse,...

  14. 46 CFR 161.002-12 - Manual fire alarm systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Manual fire alarm systems. 161.002-12 Section 161.002-12...: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Fire-Protective Systems § 161.002-12 Manual fire alarm systems. (a) General. A manual fire alarm system shall consist of a power supply, a control unit on which...

  15. 46 CFR 161.002-12 - Manual fire alarm systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Manual fire alarm systems. 161.002-12 Section 161.002-12...: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Fire-Protective Systems § 161.002-12 Manual fire alarm systems. (a) General. A manual fire alarm system shall consist of a power supply, a control unit on which...

  16. Active/Passive Control of Sound Radiation from Panels using Constrained Layer Damping

    NASA Technical Reports Server (NTRS)

    Gibbs, Gary P.; Cabell, Randolph H.

    2003-01-01

    A hybrid passive/active noise control system utilizing constrained layer damping and model predictive feedback control is presented. This system is used to control the sound radiation of panels due to broadband disturbances. To facilitate the hybrid system design, a methodology for placement of constrained layer damping which targets selected modes based on their relative radiated sound power is developed. The placement methodology is utilized to determine two constrained layer damping configurations for experimental evaluation of a hybrid system. The first configuration targets the (4,1) panel mode which is not controllable by the piezoelectric control actuator, and the (2,3) and (5,2) panel modes. The second configuration targets the (1,1) and (3,1) modes. The experimental results demonstrate the improved reduction of radiated sound power using the hybrid passive/active control system as compared to the active control system alone.

  17. Smart smoke alarm

    DOEpatents

    Warmack, Robert J. Bruce; Wolf, Dennis A; Frank, Steven Shane

    2015-04-28

    Methods and apparatus for smoke detection are disclosed. In one embodiment, a smoke detector uses linear discriminant analysis (LDA) to determine whether observed conditions indicate that an alarm is warranted.

  18. Alarm Notification System

    1995-03-12

    AN/EMS, the Alarm Notification Energy Management System, is used to monitor digital sensors in PETC buildings and to notify the safety/security operator by both a video and an audio system when a possibly hazardous condition arises.

  19. Speech Alarms Pilot Study

    NASA Technical Reports Server (NTRS)

    Sandor, Aniko; Moses, Haifa

    2016-01-01

    Speech alarms have been used extensively in aviation and included in International Building Codes (IBC) and National Fire Protection Association's (NFPA) Life Safety Code. However, they have not been implemented on space vehicles. Previous studies conducted at NASA JSC showed that speech alarms lead to faster identification and higher accuracy. This research evaluated updated speech and tone alerts in a laboratory environment and in the Human Exploration Research Analog (HERA) in a realistic setup.

  20. Thermal Performance of Orion Active Thermal Control System With Seven-Panel Reduced-Curvature Radiator

    NASA Technical Reports Server (NTRS)

    Wang, Xiao-Yen J.; Yuko, James R.

    2010-01-01

    The active thermal control system (ATCS) of the crew exploration vehicle (Orion) uses radiator panels with fluid loops as the primary system to reject heat from spacecraft. The Lockheed Martin (LM) baseline Orion ATCS uses eight-panel radiator coated with silver Teflon coating (STC) for International Space Station (ISS) missions, and uses seven-panel radiator coated with AZ 93 white paint for lunar missions. As an option to increase the radiator area with minimal impact on other component locations and interfaces, the reduced-curvature (RC) radiator concept was introduced and investigated here for the thermal perspective. Each RC radiator panel has 15 percent more area than each Lockheed Martin (LM) baseline radiator panel. The objective was to determine if the RC seven-panel radiator concept could be used in the ATCS for both ISS and lunar missions. Three radiator configurations the LM baseline, an RC seven-panel radiator with STC, and an RC seven-panel radiator with AZ 93 coating were considered in the ATCS for ISS missions. Two radiator configurations the LM baseline and an RC seven-panel radiator with AZ 93 coating were considered in the ATCS for lunar missions. A Simulink/MATLAB model of the ATCS was used to compute the ATCS performance. Some major hot phases on the thermal timeline were selected because of concern about the large amount of water sublimated for thermal topping. It was concluded that an ATCS with an RC seven-panel radiator could be used for both ISS and lunar missions, but with two different coatings STC for ISS missions and AZ 93 for lunar missions to provide performance similar to or better than that of the LM baseline ATCS.

  1. Active control of panel vibrations induced by a boundary layer flow

    NASA Technical Reports Server (NTRS)

    Chow, Pao-Liu

    1995-01-01

    The problems of active and passive control of sound and vibration has been investigated by many researchers for a number of years. However, few of the articles are concerned with the sound and vibration with flow-structure interaction. Experimental and numerical studies on the coupling between panel vibration and acoustic radiation due to flow excitation have been done by Maestrello and his associates at NASA/Langley Research Center. Since the coupled system of nonlinear partial differential equations is formidable, an analytical solution to the full problem seems impossible. For this reason, we have to simplify the problem to that of the nonlinear panel vibration induced by a uniform flow or a boundary-layer flow with a given wall pressure distribution. Based on this simplified model, we have been able to consider the control and stabilization of the nonlinear panel vibration, which have not been treated satisfactorily by other authors. Although the sound radiation has not been included, the vibration suppression will clearly reduce the sound radiation power from the panel. The major research findings are presented in three sections. In section two we describe results on the boundary control of nonlinear panel vibration, with or without flow excitation. Sections three and four are concerned with some analytical and numerical results in the optimal control of the linear and nonlinear panel vibrations, respectively, excited by the flow pressure fluctuations. Finally, in section five, we draw some conclusions from research findings.

  2. 77 FR 34045 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel: Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel: Initial Review The meeting announced below concerns Cooperative Research... Control and Prevention (CDC) announces the aforementioned meeting: Times and Dates: 8 a.m.-5 p.m., July...

  3. 78 FR 60878 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-02

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Health Promotion... Centers for Disease Control and Prevention (CDC) announces the aforementioned meeting: Times And Dates 8...

  4. 78 FR 9926 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-12

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Medicaid... 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), the Centers for Disease Control...

  5. 77 FR 25485 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-30

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Research Grants...), the Centers for Disease Control and Prevention (CDC) announces the aforementioned meeting: DATES:...

  6. 75 FR 28261 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Improved...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-20

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Improved Diagnostics for Lyme Borreliosis, Funding Opportunity... Committee Act (Pub. L. 92-463), the Centers for Disease Control and Prevention (CDC) announces...

  7. Active Control of Panel Vibrations Induced by a Boundary Layer Flow

    NASA Technical Reports Server (NTRS)

    Chow, Pao-Liu

    1998-01-01

    In recent years, active and passive control of sound and vibration in aeroelastic structures have received a great deal of attention due to many potential applications to aerospace and other industries. There exists a great deal of research work done in this area. Recent advances in the control of sound and vibration can be found in the several conference proceedings. In this report we will summarize our research findings supported by the NASA grant NAG-1-1175. The problems of active and passive control of sound and vibration has been investigated by many researchers for a number of years. However, few of the articles are concerned with the sound and vibration with flow-structure interaction. Experimental and numerical studies on the coupling between panel vibration and acoustic radiation due to flow excitation have been done by Maestrello and his associates at NASA/Langley Research Center. Since the coupled system of nonlinear partial differential equations is formidable, an analytical solution to the full problem seems impossible. For this reason, we have to simplify the problem to that of the nonlinear panel vibration induced by a uniform flow or a boundary-layer flow with a given wall pressure distribution. Based on this simplified model, we have been able to study the control and stabilization of the nonlinear panel vibration, which have not been treated satisfactorily by other authors. The vibration suppression will clearly reduce the sound radiation power from the panel. The major research findings will be presented in the next three sections. In Section II we shall describe our results on the boundary control of nonlinear panel vibration, with or without flow excitation. Section III is concerned with active control of the vibration and sound radiation from a nonlinear elastic panel. A detailed description of our work on the parametric vibrational control of nonlinear elastic panel will be presented in Section IV. This paper will be submitted to the Journal

  8. Video methods for evaluating physiologic monitor alarms and alarm responses.

    PubMed

    Bonafide, Christopher P; Zander, Miriam; Graham, Christian Sarkis; Weirich Paine, Christine M; Rock, Whitney; Rich, Andrew; Roberts, Kathryn E; Fortino, Margaret; Nadkarni, Vinay M; Lin, Richard; Keren, Ron

    2014-01-01

    False physiologic monitor alarms are extremely common in the hospital environment. High false alarm rates have the potential to lead to alarm fatigue, leading nurses to delay their responses to alarms, ignore alarms, or disable them entirely. Recent evidence from the U.S. Food and Drug Administration (FDA) and The Joint Commission has demonstrated a link between alarm fatigue and patient deaths. Yet, very little scientific effort has focused on the rigorous quantitative measurement of alarms and responses in the hospital setting. We developed a system using multiple temporarily mounted, minimally obtrusive video cameras in hospitalized patients' rooms to characterize physiologic monitor alarms and nurse responses as a proxy for alarm fatigue. This allowed us to efficiently categorize each alarm's cause, technical validity, actionable characteristics, and determine the nurse's response time. We describe and illustrate the methods we used to acquire the video, synchronize and process the video, manage the large digital files, integrate the video with data from the physiologic monitor alarm network, archive the video to secure servers, and perform expert review and annotation using alarm "bookmarks." We discuss the technical and logistical challenges we encountered, including the root causes of hardware failures as well as issues with consent, confidentiality, protection of the video from litigation, and Hawthorne-like effects. The description of this video method may be useful to multidisciplinary teams interested in evaluating physiologic monitor alarms and alarm responses to better characterize alarm fatigue and other patient safety issues in clinical settings. PMID:24847936

  9. Smoke alarm tests may not adequately indicate smoke alarm function.

    PubMed

    Peek-Asa, Corinne; Yang, Jingzhen; Hamann, Cara; Young, Tracy

    2011-01-01

    Smoke alarms are one of the most promoted prevention strategies to reduce residential fire deaths, and they can reduce residential fire deaths by half. Smoke alarm function can be measured by two tests: the smoke alarm button test and the chemical smoke test. Using results from a randomized trial of smoke alarms, we compared smoke alarm response to the button test and the smoke test. The smoke alarms found in the study homes at baseline were tested, as well as study alarms placed into homes as part of the randomized trial. Study alarms were tested at 12 and 42 months postinstallation. The proportion of alarms that passed the button test but not the smoke test ranged from 0.5 to 5.8% of alarms; this result was found most frequently among ionization alarms with zinc or alkaline batteries. These alarms would indicate to the owner (through the button test) that the smoke alarm was working, but the alarm would not actually respond in the case of a fire (as demonstrated by failing the smoke test). The proportion of alarms that passed the smoke test but not the button test ranged from 1.0 to 3.0%. These alarms would appear nonfunctional to the owner (because the button test failed), even though the alarm would operate in response to a fire (as demonstrated by passing the smoke test). The general public is not aware of the potential for inaccuracy in smoke alarm tests, and burn professionals can advocate for enhanced testing methods. The optimal test to determine smoke alarm function is the chemical smoke test. PMID:21747329

  10. Clinical Alarms in Intensive Care Units: Perceived Obstacles of Alarm Management and Alarm Fatigue in Nurses

    PubMed Central

    Cho, Ok Min; Lee, Young Whee; Cho, Insook

    2016-01-01

    Objectives The purpose of this descriptive study was to investigate the current situation of clinical alarms in intensive care unit (ICU), nurses' recognition of and fatigue in relation to clinical alarms, and obstacles in alarm management. Methods Subjects were ICU nurses and devices from 48 critically ill patient cases. Data were collected through direct observation of alarm occurrence and questionnaires that were completed by the ICU nurses. The observation time unit was one hour block. One bed out of 56 ICU beds was randomly assigned to each observation time unit. Results Overall 2,184 clinical alarms were counted for 48 hours of observation, and 45.5 clinical alarms occurred per hour per subject. Of these, 1,394 alarms (63.8%) were categorized as false alarms. The alarm fatigue score was 24.3 ± 4.0 out of 35. The highest scoring item was "always get bothered due to clinical alarms". The highest scoring item in obstacles was "frequent false alarms, which lead to reduced attention or response to alarms". Conclusions Nurses reported that they felt some fatigue due to clinical alarms, and false alarms were also obstacles to proper management. An appropriate hospital policy should be developed to reduce false alarms and nurses' alarm fatigue. PMID:26893950

  11. 76 FR 4703 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Pregnancy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Pregnancy Risk Assessment Monitoring System (PRAMS), DP11-001...

  12. 77 FR 291 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns National HIV Behavioral Surveillance For Young Men...

  13. 76 FR 82299 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Data...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Data Coordinating Center for Autism and Other Developmental Disabilities Research and Epidemiologic...

  14. 76 FR 28790 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial review.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial review. The meeting announced below concerns Affordable Care Act (ACA): Childhood Obesity...

  15. 76 FR 29756 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Centers...

  16. 77 FR 44618 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns the World...

  17. 77 FR 48986 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Member...

  18. 78 FR 19490 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Development...

  19. 77 FR 22326 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-13

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Extension of...

  20. 76 FR 28790 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Member...

  1. 78 FR 60878 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Health...

  2. 78 FR 19490 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review Notice of Cancellation: A notice was published in...

  3. 78 FR 35035 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial review The meeting announced below concerns Centers...

  4. 77 FR 7164 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Member...

  5. 78 FR 25743 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Member...

  6. 76 FR 52330 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Member...

  7. 76 FR 27327 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Virologic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Virologic Evaluation of the Modes of Influenza Virus...

  8. 77 FR 12844 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Development...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... evaluation of applications received in response to ``Development and Evaluation of a Clinic-Based Screening... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Development and Evaluation of a Clinic-Based Screening and...

  9. 76 FR 13621 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Family...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Family History and Diamond Blackfan Anemia, DD11- 010,...

  10. 77 FR 20822 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Identifying Modifiable Protective Factors for...

  11. 78 FR 78966 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-27

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Epidemiology, Prevention, and Treatment of Influenza and Other Respiratory Infections in a Malaria- Endemic Area of...

  12. 78 FR 17410 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panels (SEP): Initial review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panels (SEP): Initial review The meeting announced below concerns Epi-Centers for the Prevention of...

  13. 75 FR 29561 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Surveillance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Surveillance, Natural History, Quality of Care and Outcomes of Diabetes Mellitus with Onset in Childhood...

  14. 77 FR 3269 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Data...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-23

    ... Services Office, Centers for Disease Control and Prevention. [FR Doc. 2012-1191 Filed 1-20-12; 8:45 am... [Federal Register Volume 77, Number 14 (Monday, January 23, 2012)] [Notices] [Page 3269] [FR Doc... Prevention (CDC) Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP):...

  15. 77 FR 39497 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Special Interest Project (SIP): Evaluation of School...

  16. 76 FR 33305 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Program to Support New Implementation of State...

  17. 76 FR 7217 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Enhanced...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Enhanced Surveillance for New Vaccine Preventable Disease, Funding Opportunity Announcement (FOA),...

  18. 75 FR 28625 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Assessment of Post-Treatment Lyme Disease Syndrome, Funding...-Treatment Lyme Disease Syndrome,'' FOA CK10-004. Contact Person for More Information: Maurine Goodman,...

  19. 75 FR 27561 - Disease, Disability, and Injury Prevention and Control; Special Emphasis Panel (SEP): A...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-17

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control; Special Emphasis Panel (SEP): A Prospective Birth Cohort Study Involving Environmental Uranium... with section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), the Centers for...

  20. 78 FR 23768 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Developing Research Capacity to Assess Health...

  1. 9. Interior view of control panels' (see CO88C6) detail and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Interior view of control panels' (see CO-88-C-6) detail and control junction box on wall of the signal transfer room on the west side of the Signal Transfer Building (T-28A). - Air Force Plant PJKS, Systems Integration Laboratory, Signal Transfer Building, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  2. 78 FR 66937 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-07

    ..., initial review, published in the Federal Register on October 2, 2013 (FR Volume 78, Number 191, Page 60877... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review Notice of Cancellation: This notice...

  3. 78 FR 66938 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-07

    ... review, published in the Federal Register on September 18, 2013 (FR Volume 78, Number 181, Page 57391... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review Notice of Cancellation: This notice...

  4. 77 FR 12844 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Reducing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... among People with Intellectual Disabilities, FOA DD12-003, initial review.'' Contact Person for More... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Reducing Health Disparities Among People With...

  5. 76 FR 10908 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Maternal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Maternal Vitamin D Status and Preterm Birth, DP11-002,...

  6. 78 FR 78966 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-27

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Capacity Building Assistance for High Impact...

  7. 75 FR 76987 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Epidemiologic and Ecologic Determinants of Monkeypox in a...

  8. Comparison of various decentralised structural and cavity feedback control strategies for transmitted noise reduction through a double panel structure

    NASA Astrophysics Data System (ADS)

    Ho, Jen-Hsuan; Berkhoff, Arthur

    2014-03-01

    This paper compares various decentralised control strategies, including structural and acoustic actuator-sensor configuration designs, to reduce noise transmission through a double panel structure. The comparison is based on identical control stability indexes. The double panel structure consists of two panels with air in between and offers the advantages of low sound transmission at high frequencies, low heat transmission, and low weight. The double panel structure is widely used, such as in the aerospace and automotive industries. Nevertheless, the resonance of the cavity and the poor sound transmission loss at low frequencies limit the double panel's noise control performance. Applying active structural acoustic control to the panels or active noise control to the cavity has been discussed in many papers. In this paper, the resonances of the panels and the cavity are considered simultaneously to further reduce the transmitted noise through an existing double panel structure. A structural-acoustic coupled model is developed to investigate and compare various structural control and cavity control methods. Numerical analysis and real-time control results show that structural control should be applied to both panels. Three types of cavity control sources are presented and compared. The results indicate that the largest noise reduction is obtained with cavity control by loudspeakers modified to operate as incident pressure sources.

  9. Re-active Passive (RAP) Devices for Control of Noise Transmission through a Panel

    NASA Technical Reports Server (NTRS)

    Carneal, James P.; Giovanardi, Marco; Fuller, Chris R.; Palumbo, Daniel L.

    2008-01-01

    Re-Active Passive (RAP) devices have been developed to control low frequency (<1000 Hz) noise transmission through a panel. These devices use a combination of active, re-active, and passive technologies packaged into a single unit to control a broad frequency range utilizing the strength of each technology over its best suited frequency range. The RAP device uses passive constrained layer damping to cover the relatively high frequency range (>200 Hz), reactive distributed vibration absorber) to cover the medium frequency range (75 to 250 Hz), and active control for controlling low frequencies (<200 Hz). The device was applied to control noise transmission through a panel mounted in a transmission loss test facility. Experimental results are presented for the bare panel, and combinations of passive treatment, reactive treatment, and active control. Results indicate that three RAP devices were able to increase the overall broadband (15-1000 Hz) transmission loss by 9.4 dB. These three devices added a total of 285 grams to the panel mass of 6.0 kg, or approximately 5%, not including control electronics.

  10. Development of Advanced Alarm System for SMART

    SciTech Connect

    Jang, Gwi-sook; Seoung, Duk-hyun; Suh, Sang-moon; Lee, Jong-bok; Park, Geun-ok; Koo, In-soo

    2004-07-01

    A SMART-Alarm System (SMART-AS) is a new system being developed as part of the SMART (System-integrated Modular Advanced Reactor) project. The SMART-AS employs modern digital technology to implement the alarm functions of the SMART. The use of modern digital technology can provide advanced alarm processing in which new algorithms such as a signal validation, advanced alarm processing logic and other features are applied to improve the control room man-machine interfaces. This paper will describe the design process of the SMART-AS, improving the system reliability and availability using the reliability prediction tool, design strategies regarding the human performance topics associated with a computer-based SMART-AS and the results of the performance analysis using a prototype of the SMART-AS. (authors)

  11. Monitoring and control system of charging batteries connected to a photovoltaic panel

    NASA Astrophysics Data System (ADS)

    Idzkowski, Adam; Leoniuk, Katarzyna; Walendziuk, Wojciech; Budzynski, Lukasz

    2015-09-01

    In this paper the off-grid photovoltaic system consisting of a PV panel, MMPT charge controller and battery is described. The realization of a laboratory stand for charging or discharging batteries is presented. Original monitoring and control system, which is based on LabVIEW software and LabJack DAQ device, has been built. Data acquisition part, arithmetic part and front panel of program created in LabVIEW are described. Some problems with implementation of this system, providing the monitoring of electrical parameters, are mentioned.

  12. 61. Upper panel in cornerpower panel lcpa lower panel in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    61. Upper panel in corner-power panel lcpa lower panel in corner-oxygen regeneration unit, at right-air conditioner control panel, on floor-bio-pack 45 for emergency breathing, looking northwest - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD

  13. FIRE ALARM SYSTEM OUTDATED.

    ERIC Educational Resources Information Center

    CHANDLER, L.T.

    AN EFFICIENT FIRE ALARM SYSTEM SHOULD--(1) PROVIDE WARNING OF FIRES THAT START IN HIDDEN OR UNOCCUPIED LOCATIONS, (2) INDICATE WHERE THE FIRE IS, (3) GIVE ADVANCE WARNING TO FACULTY AND ADMINISTRATION SO THAT PANIC AND CONFUSION CAN BE AVOIDED AND ORDERLY EVACUATION OCCUR, (4) AUTOMATICALLY NOTIFY CITY FIRE HEADQUARTERS OF THE FIRE, (5) OPERATE BY…

  14. 46 CFR 113.25-15 - Distribution panels.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Distribution panels. 113.25-15 Section 113.25-15... ALARM SYSTEMS AND EQUIPMENT General Emergency Alarm Systems § 113.25-15 Distribution panels. Each distribution panel must: (a) Be watertight; (b) Need a tool to be opened....

  15. 46 CFR 113.25-15 - Distribution panels.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Distribution panels. 113.25-15 Section 113.25-15... ALARM SYSTEMS AND EQUIPMENT General Emergency Alarm Systems § 113.25-15 Distribution panels. Each distribution panel must: (a) Be watertight; (b) Need a tool to be opened....

  16. SUBSURFACE VISUAL ALARM SYSTEM ANALYSIS

    SciTech Connect

    D.W. Markman

    2001-08-06

    difficulty and complexity in determining requirements in adapting existing data communication highways to support the subsurface visual alarm system. These requirements would include such things as added or new communication cables, added Programmable Logic Controller (PLC), Inputs and Outputs (I/O), and communication hardware components, and human machine interfaces and their software operating system. (4) Select the best data communication highway system based on this review of adapting or integrating with existing data communication systems.

  17. Flutter and thermal buckling control for composite laminated panels in supersonic flow

    NASA Astrophysics Data System (ADS)

    Li, Feng-Ming; Song, Zhi-Guang

    2013-10-01

    Aerothermoelastic analysis for composite laminated panels in supersonic flow is carried out. The flutter and thermal buckling control for the panels are also investigated. In the modeling for the equation of motion, the influences of in-plane thermal load on the transverse bending deflection are taken into account, and the unsteady aerodynamic pressure in supersonic flow is evaluated by the linear piston theory. The governing equation of the structural system is developed applying the Hamilton's principle. In order to study the influences of aerodynamic pressure on the vibration mode shape of the panel, both the assumed mode method (AMM) and the finite element method (FEM) are used to derive the equation of motion. The proportional feedback control method and the linear quadratic regulator (LQR) are used to design the controller. The aeroelastic stability of the structural system is analyzed using the frequency-domain method. The effects of ply angle of the laminated panel on the critical flutter aerodynamic pressure and the critical buckling temperature change are researched. The flutter and thermal buckling control effects using the proportional feedback control and the LQR are compared. An effective method which can suppress the flutter and thermal buckling simultaneously is proposed.

  18. WTEC panel report on European nuclear instrumentation and controls

    NASA Technical Reports Server (NTRS)

    White, James D.; Lanning, David D.; Beltracchi, Leo; Best, Fred R.; Easter, James R.; Oakes, Lester C.; Sudduth, A. L.

    1991-01-01

    Control and instrumentation systems might be called the 'brain' and 'senses' of a nuclear power plant. As such they become the key elements in the integrated operation of these plants. Recent developments in digital equipment have allowed a dramatic change in the design of these instrument and control (I&C) systems. New designs are evolving with cathode ray tube (CRT)-based control rooms, more automation, and better logical information for the human operators. As these new advanced systems are developed, various decisions must be made about the degree of automation and the human-to-machine interface. Different stages of the development of control automation and of advanced digital systems can be found in various countries. The purpose of this technology assessment is to make a comparative evaluation of the control and instrumentation systems that are being used for commercial nuclear power plants in Europe and the United States. This study is limited to pressurized water reactors (PWR's). Part of the evaluation includes comparisons with a previous similar study assessing Japanese technology.

  19. 76 FR 367 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Minority HIV...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-04

    ... Control Special Emphasis Panel (SEP): Minority HIV/AIDS Research Initiative (MARI) To Build Capacity in Black and Hispanic Communities and Among Black and Hispanic Researchers To Conduct HIV/AIDS... evaluation of applications received in response to ``Minority HIV/AIDS Research Initiative (MARI) to...

  20. 76 FR 13414 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Pilot...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... Control Special Emphasis Panel (SEP): Pilot Longitudinal Data Collection To Inform Public Health--Fragile X Syndrome, DD11-007, Initial Review Notice of Cancellation: This notice was published in the Federal Register on December 17, 2010, Volume 75, Number 242, page 78997. This SEP previously scheduled...

  1. 76 FR 3908 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): The...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-21

    ... Control Special Emphasis Panel (SEP): The Association of Genetic Biomarkers and Hereditary Hemochromatosis..., discussion, and evaluation of ``The Association of Genetic Biomarkers and Hereditary Hemochromatosis, DD11..., Extramural Research Program Office, 4770 Buford Highway, NE., Mailstop K-92, Atlanta, GA 30341,...

  2. 75 FR 13560 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Knowledge...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... Control Special Emphasis Panel (SEP): Knowledge Synthesis Center for Evaluating Genomic Application in...), Title 5 U.S.C., and the Determination of the Director, Management Analysis and Services Office, CDC..., discussion, and evaluation of applications received in response to ``Knowledge Synthesis Center...

  3. 78 FR 19489 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ..., discussion, and evaluation of ``Low Dose CT Lung Cancer Screening: Informed Decision Making and Smoking... Control Special Emphasis Panel (SEP): Initial Review The meeting announced below concerns Low Dose CT Lung Cancer Screening: Informed Decision Making and Smoking Cessation, Special Interest Project...

  4. PROCESS WATER BUILDING, TRA605. CONTROL PANEL SUPPLIES STATUS INDICATORS. CARD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PROCESS WATER BUILDING, TRA-605. CONTROL PANEL SUPPLIES STATUS INDICATORS. CARD IN LOWER RIGHT WAS INSERTED BY INL PHOTOGRAPHER TO COVER AN OBSOLETE SECURITY RESTRICTION ON ORIGINAL NEGATIVE. INL NEGATIVE NO. 4219. Unknown Photographer, 2/13/1952 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  5. Industry/Government Teleconference on Pollution Control. Proceedings National Telecast and Local Panel Sessions.

    ERIC Educational Resources Information Center

    National Association of Manufacturers, New York, NY.

    Proceedings of the closed-circuit Teleconference on Pollution Control conducted by the National Association of Manufacturers on May 26, 1971 are supplied in this compendium. Edited transcripts are provided for the national programs and local panel sessions. Seeking to bring business and government together for cooperative problem solving, the…

  6. 76 FR 27327 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-11

    ... Control Special Emphasis Panel (SEP): Meeting Studies at the Animal-Human Interface of Influenza and Other... of Influenza-Associated Community- Acquired Pneumonia in Hospitalized Persons Study; FOA IP11-011...; FOA IP11-012, Influenza Vaccine Efficacy in Tropical and Developing Countries; FOA IP11-013,...

  7. 58. DETAIL OF SLC3W UMBILICAL MAST CONTROL PANEL LOCATED ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. DETAIL OF SLC-3W UMBILICAL MAST CONTROL PANEL LOCATED ON WEST SIDE OF MAST TRENCH APPROXIMATELY HALF WAY BETWEEN THE NORTH END OF TRENCH AND LAUNCHER - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  8. Application of a Broadband Active Vibration Control System to a Helicopter Trim Panel

    NASA Technical Reports Server (NTRS)

    Cabell, Randolph H.; Schiller, Noah H.; Simon, Frank

    2013-01-01

    This paper discusses testing of a broadband active vibration control concept on an interior trim panel in a helicopter cabin mockup located at ONERA's Centre de Toulouse. The control system consisted of twelve diamond-shaped piezoelectric actuators distributed around a 1.2m x 1.2m trim panel. Accelerometers were mounted at the four vertices of each diamond. The aspect ratio of the diamond was based on the dielectric constants of the piezoelectric material in order to create an actuator-sensor pair that was collocated over a broad frequency range. This allowed robust control to be implemented using simple, low power analog electronics. Initial testing on a thick acrylic window demonstrated the capability of the controller, but actuator performance was less satisfactory when mounted on a composite sandwich trim panel. This may have been due to the orthotropic nature of the trim panel, or due to its much higher stiffness relative to the acrylic window. Insights gained from a finite element study of the actuator-sensor-structural system are discussed.

  9. Causal feedforward control of a stochastically excited fuselage structure with active sidewall panel.

    PubMed

    Misol, Malte; Haase, Thomas; Monner, Hans Peter; Sinapius, Michael

    2014-10-01

    This paper provides experimental results of an aircraft-relevant double panel structure mounted in a sound transmission loss facility. The primary structure of the double panel system is excited either by a stochastic point force or by a diffuse sound field synthesized in the reverberation room of the transmission loss facility. The secondary structure, which is connected to the frames of the primary structure, is augmented by actuators and sensors implementing an active feedforward control system. Special emphasis is placed on the causality of the active feedforward control system and its implications on the disturbance rejection at the error sensors. The coherence of the sensor signals is analyzed for the two different disturbance excitations. Experimental results are presented regarding the causality, coherence, and disturbance rejection of the active feedforward control system. Furthermore, the sound transmission loss of the double panel system is evaluated for different configurations of the active system. A principal result of this work is the evidence that it is possible to strongly influence the transmission of stochastic disturbance sources through double panel configurations by means of an active feedforward control system. PMID:25324065

  10. 8. Interior view of control panels' (see CO88C6) detail on ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Interior view of control panels' (see CO-88-C-6) detail on wall of the signal transfer room on the west side of the Signal Transfer Building (T-28A). - Air Force Plant PJKS, Systems Integration Laboratory, Signal Transfer Building, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  11. 7. Interior view of control panels' (see CO88C6) detail on ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Interior view of control panels' (see CO-88-C-6) detail on wall of the signal transfer room on the west side of the Signal Transfer Building (T-28A). - Air Force Plant PJKS, Systems Integration Laboratory, Signal Transfer Building, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  12. PROCESS WATER BUILDING, TRA605, INTERIOR. FIRST FLOOR. CONTROL PANELS AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PROCESS WATER BUILDING, TRA-605, INTERIOR. FIRST FLOOR. CONTROL PANELS AND OPERATOR STATION WERE LATER ENCLOSED AS "ROOM 104." CAMERA FACING EAST. HONEYWALL GAUGES HAVE BEEN IDENTIFIED AS "EXCESS" PROPERTY DURING DEMOLITION OF THE FACILITY. INL NEGATIVE NO. HD46-26-4. Mike Crane, Photographer, 2/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  13. 76 FR 15984 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Combining...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... Control Special Emphasis Panel (SEP): Combining Subjective and Objective Methods for Quantifying Contact... applications received in response to ``Combining Subjective and Objective Methods for Quantifying Contact Rates and Mixing Pattern in School-Aged Children, FOA CK11-006.'' Contact Person For More...

  14. Modal seismic analysis of a nuclear power plant control panel and comparison with SAP 4

    NASA Technical Reports Server (NTRS)

    Pamidi, M. R.; Pamidi, P. R.

    1976-01-01

    The application of NASTRAN to seismic analysis by considering the example of a nuclear power plant control panel was considered. A modal analysis of a three-dimensional model of the panel, consisting of beam and quadri-lateral membrane elements, is performed. Using the results of this analysis and a typical response spectrum of an earthquake, the seismic response of the structure is obtained. ALTERs required to the program in order to compute the maximum modal responses as well as the resultant response are given. The results are compared with those obtained by using the SAP IV computer program.

  15. Development of technology for the fabrication of reliable laminar flow control panels on subsonic transports

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The feasibility of using porous composite materials (Kevlar, Doweave, and Leno Weave) as lightweight, efficient laminar flow control (LFC) surface materials is compared to the metallic 319L stainless Dynapore surfaces and electron beam drilled composite surfaces. Areas investigated include: (1) selection of the LFC-suitable surface materials, structural materials, and fabrication techniques for the LFC aircraft skins; (2) aerodynamic static air flow test results in terms of pressure drop through the LFC panel and the corresponding effective porosity; (3) structural design definition and analyses of the panels, and (4) contamination effects on static drop and effective porosity. Conclusions are presented and discussed.

  16. Hybrid Active/Passive Control of Sound Radiation from Panels with Constrained Layer Damping and Model Predictive Feedback Control

    NASA Technical Reports Server (NTRS)

    Cabell, Randolph H.; Gibbs, Gary P.

    2000-01-01

    There has been considerable interest over the past several years in applying feedback control methods to problems of structural acoustics. One problem of particular interest is the control of sound radiation from aircraft panels excited on one side by a turbulent boundary layer (TBL). TBL excitation appears as many uncorrelated sources acting on the panel, which makes it difficult to find a single reference signal that is coherent with the excitation. Feedback methods have no need for a reference signal, and are thus suited to this problem. Some important considerations for the structural acoustics problem include the fact that the required controller bandwidth can easily extend to several hundred Hertz, so a digital controller would have to operate at a few kilohertz. In addition, aircraft panel structures have a reasonably high modal density over this frequency range. A model based controller must therefore handle the modally dense system, or have some way to reduce the bandwidth of the problem. Further complicating the problem is the fact that the stiffness and dynamic properties of an aircraft panel can vary considerably during flight due to altitude changes resulting in significant resonant frequency shifts. These considerations make the tradeoff between robustness to changes in the system being controlled and controller performance especially important. Recent papers concerning the design and implementation of robust controllers for structural acoustic problems highlight the need to consider both performance and robustness when designing the controller. While robust control methods such as H1 can be used to balance performance and robustness, their implementation is not easy and requires assumptions about the types of uncertainties in the plant being controlled. Achieving a useful controller design may require many tradeoff studies of different types of parametric uncertainties in the system. Another approach to achieving robustness to plant changes is to

  17. The control, monitor, and alarm system for the ICT equipment of the ASTRI SST-2M telescope prototype for the Cherenkov Telescope Array

    NASA Astrophysics Data System (ADS)

    Gianotti, Fulvio; Fioretti, Valentina; Tanci, Claudio; Conforti, Vito; Tacchini, Alessandro; Leto, Giuseppe; Gallozzi, Stefano; Bulgarelli, Andrea; Trifoglio, Massimo; Malaguti, Giuseppe; Zoli, Andrea

    2014-07-01

    ASTRI is an Italian flagship project whose first goal is the realization of an end-to-end telescope prototype, named ASTRI SST-2M, for the Cherenkov Telescope Array (CTA). The prototype will be installed in Italy during Fall 2014. A second goal will be the realization of the ASTRI/CTA mini-array which will be composed of seven SST-2M telescopes placed at the CTA Southern Site. The Information and Communication Technology (ICT) equipment necessary to drive the infrastructure for the ASTRI SST-2M prototype is being designed as a complete and stand-alone computer center. The design goal is to obtain basic ICT equipment that might be scaled, with a low level of redundancy, for the ASTRI/CTA mini-array, taking into account the necessary control, monitor and alarm system requirements. The ICT equipment envisaged at the Serra La Nave observing station in Italy, where the ASTRI SST-2M telescope prototype will operate, includes computers, servers and workstations, network devices, an uninterruptable power supply system, and air conditioning systems. Suitable hardware and software tools will allow the parameters related to the behavior and health of each item of equipment to be controlled and monitored. This paper presents the proposed architecture and technical solutions that integrate the ICT equipment in the framework of the Observatory Control System package of the ASTRI/CTA Mini- Array Software System, MASS, to allow their local and remote control and monitoring. An end-toend test case using an Internet Protocol thermometer is reported in detail.

  18. WTEC panel report on European nuclear instrumentation and controls. Final report

    SciTech Connect

    White, J.D.; Lanning, D.D.; Beltracchi, L.; Best, F.R.; Easter, J.R.

    1991-12-01

    A study of instrumentation and controls (I and C) technology used in nuclear power plants in Europe was conducted by a panel of American specialists. The study included a review of the literature on the subject, followed by a visit to some of the leading organizations in Europe in the field of nuclear I and C. The findings of the study are presented in the report. The scope is limited to pressurized water reactors in Czechoslovakia, France, Germany, Norway and Russia. Specific topics include: The role of the operator and control room design; the transition from analog to digital technology; computerized operator support systems for fault management; control strategies and techniques; an investigation of nuclear power plant I and C architecture; instrumentation; computer standards and tools. A companion study is JTEC Panel Report on Nuclear Power in Japan (PB90-215724).

  19. WTEC panel report on European nuclear instrumentation and controls. Final report

    SciTech Connect

    White, J.D.; Lanning, D.D.; Johnson, P.M.H.; Shelton, R.D.

    1991-12-01

    A study of instrumentation and controls (I and C) technology used in nuclear power plants in Europe was conducted by a panel of US specialists. This study plants in Europe was conducted by a panel of US specialists. This study included a review of the literature on the subject, followed by a visit to some of the leading organizations in Europe in the field nuclear I and C. Areas covered are: (1) role of the operator and control room design; (2) transition from analog to digital technology; (3) computerized operator support systems for fault management; (4) control strategies and techniques; (5) Nuclear power plant I and C architecture; (6) instrumentation and (7) computer standards and tools. The finding relate to poor reactions.

  20. Reducing SCADA System Nuisance Alarms in the Water Industry in Northern Ireland.

    PubMed

    O'Donoghue, Nigel; Phillips, Debra H; Nicell, Ciaran

    2015-08-01

    The advancement of telemetry control for the water industry has increased the difficulty of managing large volumes of nuisance alarms (i.e., alarms that do not require a response). The aim of this study was to identify and reduce the number of nuisance alarms that occur for Northern Ireland (NI) Water by carrying out alarm duration analysis to determine the appropriate length of persistence (an advanced alarm management tool) that could be applied. All data were extracted from TelemWeb (NI Water's telemetry monitoring system) and analyzed in Excel. Over a 6-week period, an average of 40 000 alarms occurred per week. The alarm duration analysis, which has never been implemented before by NI Water, found that an average of 57% of NI Water alarms had a duration of <5 minutes. Applying 5-minute persistence, therefore, could prevent an average 26 816 nuisance alarms per week. Most of these alarms were from wastewater assets. PMID:26237691

  1. Hypo- and Hyperglycemic Alarms

    PubMed Central

    Howsmon, Daniel; Bequette, B. Wayne

    2015-01-01

    Soon after the discovery that insulin regulates blood glucose by Banting and Best in 1922, the symptoms and risks associated with hypoglycemia became widely recognized. This article reviews devices to warn individuals of impending hypo- and hyperglycemia; biosignals used by these devices include electroencephalography, electrocardiography, skin galvanic resistance, diabetes alert dogs, and continuous glucose monitors (CGMs). While systems based on other technology are increasing in performance and decreasing in size, CGM technology remains the best method for both reactive and predictive alarming of hypo- or hyperglycemia. PMID:25931581

  2. Speech Alarms Pilot Study

    NASA Technical Reports Server (NTRS)

    Sandor, A.; Moses, H. R.

    2016-01-01

    Currently on the International Space Station (ISS) and other space vehicles Caution & Warning (C&W) alerts are represented with various auditory tones that correspond to the type of event. This system relies on the crew's ability to remember what each tone represents in a high stress, high workload environment when responding to the alert. Furthermore, crew receive a year or more in advance of the mission that makes remembering the semantic meaning of the alerts more difficult. The current system works for missions conducted close to Earth where ground operators can assist as needed. On long duration missions, however, they will need to work off-nominal events autonomously. There is evidence that speech alarms may be easier and faster to recognize, especially during an off-nominal event. The Information Presentation Directed Research Project (FY07-FY09) funded by the Human Research Program included several studies investigating C&W alerts. The studies evaluated tone alerts currently in use with NASA flight deck displays along with candidate speech alerts. A follow-on study used four types of speech alerts to investigate how quickly various types of auditory alerts with and without a speech component - either at the beginning or at the end of the tone - can be identified. Even though crew were familiar with the tone alert from training or direct mission experience, alerts starting with a speech component were identified faster than alerts starting with a tone. The current study replicated the results from the previous study in a more rigorous experimental design to determine if the candidate speech alarms are ready for transition to operations or if more research is needed. Four types of alarms (caution, warning, fire, and depressurization) were presented to participants in both tone and speech formats in laboratory settings and later in the Human Exploration Research Analog (HERA). In the laboratory study, the alerts were presented by software and participants were

  3. Physical mechanisms of active control of sound transmission through rib stiffened double-panel structure

    NASA Astrophysics Data System (ADS)

    Ma, Xiyue; Chen, Kean; Ding, Shaohu; Yu, Haoxin

    2016-06-01

    This paper presents an analytical investigation on physical mechanisms of actively controlling sound transmission through a rib stiffened double-panel structure using point source in the cavity. The combined modal expansion and vibro-acoustic coupling methods are applied to establish the theoretical model of such active structure. Under the condition of minimizing radiated power of the radiating ribbed plate, the physical mechanisms are interpreted in detail from the point of view of modal couplings similar as that used in existed literatures. Results obtained demonstrate that the rule of sound energy transmission and the physical mechanisms for the rib stiffened double-panel structure are all changed, and affected by the coupling effects of the rib when compared with the analytical results obtained for unribbed double-panel case. By taking the coupling effects of the rib into considerations, the cavity modal suppression and rearrangement mechanisms obtained in existed investigations are modified and supplemented for the ribbed plate case, which gives a clear interpretation for the physical nature involved in the active rib stiffened double-panel structure.

  4. Functional relationship-based alarm processing

    DOEpatents

    Corsberg, D.R.

    1987-04-13

    A functional relationship-based alarm processing system and method analyzes each alarm as it is activated and determines its relative importance with other currently activated alarms and signals in accordance with the relationships that the newly activated alarm has with other currently activated alarms. Once the initial level of importance of the alarm has been determined, that alarm is again evaluated if another related alarm is activated. Thus, each alarm's importance is continuously updated as the state of the process changes during a scenario. Four hierarchical relationships are defined by this alarm filtering methodology: (1) level precursor (usually occurs when there are two alarm settings on the same parameter); (2) direct precursor (based on causal factors between two alarms); (3) required action (system response or action expected within a specified time following activation of an alarm or combination of alarms and process signals); and (4) blocking condition (alarms that are normally expected and are not considered important). 11 figs.

  5. Alarm toe switch

    DOEpatents

    Ganyard, Floyd P.

    1982-01-01

    An alarm toe switch inserted within a shoe for energizing an alarm circuit n a covert manner includes an insole mounting pad into which a miniature reed switch is fixedly molded. An elongated slot perpendicular to the reed switch is formed in the bottom surface of the mounting pad. A permanent cylindrical magnet positioned in the forward portion of the slot with a diameter greater than the pad thickness causes a bump above the pad. A foam rubber block is also positioned in the slot rearwardly of the magnet and holds the magnet in normal inoperative relation. A non-magnetic support plate covers the slot and holds the magnet and foam rubber in the slot. The plate minimizes bending and frictional forces to improve movement of the magnet for reliable switch activation. The bump occupies the knuckle space beneath the big toe. When the big toe is scrunched rearwardly the magnet is moved within the slot relative to the reed switch, thus magnetically activating the switch. When toe pressure is released the foam rubber block forces the magnet back into normal inoperative position to deactivate the reed switch. The reed switch is hermetically sealed with the magnet acting through the wall so the switch assembly S is capable of reliable operation even in wet and corrosive environments.

  6. Decentralized Control of Sound Radiation from an Aircraft-Style Panel Using Iterative Loop Recovery

    NASA Technical Reports Server (NTRS)

    Schiller, Noah H.; Cabell, Randolph H.; Fuller, Chris R.

    2008-01-01

    A decentralized LQG-based control strategy is designed to reduce low-frequency sound transmission through periodically stiffened panels. While modern control strategies have been used to reduce sound radiation from relatively simple structural acoustic systems, significant implementation issues have to be addressed before these control strategies can be extended to large systems such as the fuselage of an aircraft. For instance, centralized approaches typically require a high level of connectivity and are computationally intensive, while decentralized strategies face stability problems caused by the unmodeled interaction between neighboring control units. Since accurate uncertainty bounds are not known a priori, it is difficult to ensure the decentralized control system will be robust without making the controller overly conservative. Therefore an iterative approach is suggested, which utilizes frequency-shaped loop recovery. The approach accounts for modeling error introduced by neighboring control loops, requires no communication between subsystems, and is relatively simple. The control strategy is validated using real-time control experiments performed on a built-up aluminum test structure representative of the fuselage of an aircraft. Experiments demonstrate that the iterative approach is capable of achieving 12 dB peak reductions and a 3.6 dB integrated reduction in radiated sound power from the stiffened panel.

  7. Active control of sound radiation from a vibrating rectangular panel by sound sources and vibration inputs - An experimental comparison

    NASA Technical Reports Server (NTRS)

    Fuller, C. R.; Hansen, C. H.; Snyder, S. D.

    1991-01-01

    Active control of sound radiation from a rectangular panel by two different methods has been experimentally studied and compared. In the first method a single control force applied directly to the structure is used with a single error microphone located in the radiated acoustic field. Global attenuation of radiated sound was observed to occur by two main mechanisms. For 'on-resonance' excitation, the control force had the effect of increasing the total panel input impedance presented to the nosie source, thus reducing all radiated sound. For 'off-resonance' excitation, the control force tends not significantly to modify the panel total response amplitude but rather to restructure the relative phases of the modes leading to a more complex vibration pattern and a decrease in radiation efficiency. For acoustic control, the second method, the number of acoustic sources required for global reduction was seen to increase with panel modal order. The mechanism in this case was that the acoustic sources tended to create an inverse pressure distribution at the panel surface and thus 'unload' the panel by reducing the panel radiation impedance. In general, control by structural inputs appears more effective than control by acoustic sources for structurally radiated noise.

  8. Learning control for slewing of a flexible panel. [large space structures

    NASA Technical Reports Server (NTRS)

    Phan, M.; Longman, R. W.; Wei, Y.; Horta, L. G.; Juang, J.-N.

    1989-01-01

    This paper studies the applicability of a discrete-time learning control method to the slewing control of a large flexible panel. Among the issues discussed are feasibility of the desired trajectories and their specification schemes, learning control by linear feedback, limitation of the actuator device output, and robustness to parameter changes or modeling errors associated with the chosen learning control design. To demonstrate the effectiveness of learning control, the system is designed with a proportional controller of the base angle only. Then application of the learning control is shown to make the system learn quickly to achieve the desired slewing without residual vibration at the end of the maneuver. Simulation results are reported and discussed.

  9. Active control of panel vibrations induced by boundary-layer flow

    NASA Technical Reports Server (NTRS)

    Chow, Pao-Liu

    1991-01-01

    Some problems in active control of panel vibration excited by a boundary layer flow over a flat plate are studied. In the first phase of the study, the optimal control problem of vibrating elastic panel induced by a fluid dynamical loading was studied. For a simply supported rectangular plate, the vibration control problem can be analyzed by a modal analysis. The control objective is to minimize the total cost functional, which is the sum of a vibrational energy and the control cost. By means of the modal expansion, the dynamical equation for the plate and the cost functional are reduced to a system of ordinary differential equations and the cost functions for the modes. For the linear elastic plate, the modes become uncoupled. The control of each modal amplitude reduces to the so-called linear regulator problem in control theory. Such problems can then be solved by the method of adjoint state. The optimality system of equations was solved numerically by a shooting method. The results are summarized.

  10. 33 CFR 127.201 - Sensing and alarm systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... systems. (a) Fixed sensors must have audio and visual alarms in the control room and audio alarms nearby. (b) Fixed sensors that continuously monitor for LNG vapors must— (1) Be in each enclosed area where vapor or gas may accumulate; and (2) Meet Section 9-4 of NFPA 59A. (c) Fixed sensors that...

  11. 33 CFR 127.201 - Sensing and alarm systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... systems. (a) Fixed sensors must have audio and visual alarms in the control room and audio alarms nearby. (b) Fixed sensors that continuously monitor for LNG vapors must— (1) Be in each enclosed area where vapor or gas may accumulate; and (2) Meet Section 9-4 of NFPA 59A. (c) Fixed sensors that...

  12. 33 CFR 127.201 - Sensing and alarm systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... systems. (a) Fixed sensors must have audio and visual alarms in the control room and audio alarms nearby. (b) Fixed sensors that continuously monitor for LNG vapors must— (1) Be in each enclosed area where vapor or gas may accumulate; and (2) Meet Section 9-4 of NFPA 59A. (c) Fixed sensors that...

  13. 33 CFR 127.201 - Sensing and alarm systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... systems. (a) Fixed sensors must have audio and visual alarms in the control room and audio alarms nearby. (b) Fixed sensors that continuously monitor for LNG vapors must— (1) Be in each enclosed area where vapor or gas may accumulate; and (2) Meet Section 9-4 of NFPA 59A. (c) Fixed sensors that...

  14. 33 CFR 127.201 - Sensing and alarm systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... systems. (a) Fixed sensors must have audio and visual alarms in the control room and audio alarms nearby. (b) Fixed sensors that continuously monitor for LNG vapors must— (1) Be in each enclosed area where vapor or gas may accumulate; and (2) Meet Section 9-4 of NFPA 59A. (c) Fixed sensors that...

  15. Evaluation of ventilator alarms.

    PubMed

    1984-01-01

    An evaluation of ventilator alarms is being carried out for the DHSS within the Welsh National School of Medicine. The technical performance and safety assessments are being made within the Department of Anaesthetics and clinical trials within the South Glamorgan Area Health Authority. For this evaluation (published in 'Health Equipment Information' ['HEI'] No. 124 [June 1984]) one example of each model was assessed (Penlon IDP, Draeger, Medix Ventimonitor 101, BOC Medishield, East Ventilarm, Cape TTL) and the conclusions are based on the assumption that the sample was typical of normal production. This is a continuing programme and the next report will evaluate a group of infant ventilators. For full details of the evaluation findings, readers should consult 'HEI' 124. The following are extracts from the report. PMID:6398368

  16. 75 FR 78246 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Pre-Travel...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-15

    ... Control Special Emphasis Panel (SEP): Pre-Travel Health: Improving and Expanding the Implementation of... evaluation of applications received in response to ``Pre-Travel Health: Improving and Expanding...

  17. Selection of population controls for a Salmonella case-control study in the UK using a market research panel and web-survey provides time and resource savings.

    PubMed

    Mook, P; Kanagarajah, S; Maguire, H; Adak, G K; Dabrera, G; Waldram, A; Freeman, R; Charlett, A; Oliver, I

    2016-04-01

    Timely recruitment of population controls in infectious disease outbreak investigations is challenging. We evaluated the timeliness and cost of using a market research panel as a sampling frame for recruiting controls in a case-control study during an outbreak of Salmonella Mikawasima in the UK in 2013. We deployed a web-survey by email to targeted members of a market research panel (panel controls) in parallel to the outbreak control team interviewing randomly selected public health staff by telephone and completing paper-based questionnaires (staff controls). Recruitment and completion of exposure history web-surveys for panel controls (n = 123) took 14 h compared to 15 days for staff controls (n = 82). The average staff-time cost per questionnaire for staff controls was £13·13 compared to an invoiced cost of £3·60 per panel control. Differences in the distribution of some exposures existed between these control groups but case-control studies using each group found that illness was associated with consumption of chicken outside of the home and chicken from local butchers. Recruiting market research panel controls offers time and resource savings. More rapid investigations would enable more prompt implementation of control measures. We recommend that this method of recruiting controls is considered in future investigations and assessed further to better understand strengths and limitations. PMID:26493476

  18. Study of the damping characteristics of general aviation aircraft panels and development of computer programs to calculate the effectiveness of interior noise control treatment, part 1

    NASA Technical Reports Server (NTRS)

    Navaneethan, R.; Hunt, J.; Quayle, B.

    1982-01-01

    Tests were carried out on 20 inch x 20 inch panels at different test conditions using free-free panels, clamped panels, and panels as installed in the KU-FRL acoustic test facility. Tests with free-free panels verified the basic equipment set-up and test procedure. They also provided a basis for comparison. The results indicate that the effect of installed panels is to increase the damping ratio at the same frequency. However, a direct comparison is not possible, as the fundamental frequency of a free-free panel differs from the resonance frequency of the panel when installed. The damping values of panels installed in the test facility are closer to the damping values obtained with fixed-fixed panels. Effects of damping tape, stiffeners, and bonded and riveted edged conditions were also investigated. Progress in the development of a simple interior noise level control program is reported.

  19. Evaluation of fire-safety programs that use 10-year smoke alarms.

    PubMed

    Jackson, Mark; Wilson, Jonathan; Akoto, Judith; Dixon, Sherry; Jacobs, David E; Ballesteros, Michael F

    2010-10-01

    The Centers for Disease Control and Prevention began funding a Smoke Alarm Installation and Fire Safety Education (SAIFE) program in 1998. This program involves the installation of lithium-powered "10-year" smoke alarms in homes at high risk for fires and injuries. This study aimed to (1) determine among original SAIFE homes if the lithium-powered alarms were still present and functional 8-10 years after installation and (2) understand factors related to smoke alarm presence and functionality. Data on a total of 384 homes and 601 smoke alarms in five states were collected and analyzed. Only one-third of alarms were still functional; 37% of installed alarms were missing; and 30% of alarms were present, but not functioning. Alarms were less likely to be functioning if they were installed in the kitchen and if homes had a different resident at follow-up. Of the 351 alarms that were present and had a battery at the time of the evaluation, only 21% contained lithium-powered batteries. Of these, 78% were still functioning. Programs that install lithium-powered alarms should use units that have sealed-in batteries and "hush" buttons. Additionally, education should be given on smoke alarm maintenance that includes a message that batteries in these alarms should not be replaced. Lithium-powered smoke alarms should last up to 10 years if maintained properly. PMID:20177753

  20. Learning guide for the terminal configured vehicle advanced guidance and control system mode select panel

    NASA Technical Reports Server (NTRS)

    Anderson, M. A.; Callahan, R.

    1981-01-01

    This learning guide is designed to assist pilots in taking the PLATO presimulator training course on the advanced guidance and control system mode select panel. The learning guide is divided into five sections. The first section, the introduction, presents the course goals, prerequisites, definition of PLATO activities, and a suggested approach to completing the course. The remaining four sections present the purpose, learning activities and summary of each lesson of the AGCS PLATO course, which consists of (1) AGCS introduction; (2) lower order modes; (3) higher order modes; and (4) an arrival route exercise.

  1. On designing of the driven system control of solar panels using type 2 fuzzy sliding mode control (T2FSMC)

    NASA Astrophysics Data System (ADS)

    Mardlijah, Subiono, S., Sentot D.; Efprianto, Yahya

    2016-02-01

    Collectors on the solar panel can work optimally when the collectors position perpendicular to the whole solar rays. Therefore we need a control system to control the position of the collectors always perpendicular to the sun rays. In this paper, control system T2FSMC is proposed, combined SMC, FLC and fuzzy type 2 which has a membership function more complex so as to provide an additional degree of freedom that allows uncertainty. the behavior of the control system based on T2FSMC for the driven system of solar panels was analyzed by comparing T2FSMC with FSMC and SMC methods. It can be concluded that the system controller of T2FSMC works better than the system controller of FSMC and SMC; i.e. faster response time, more robust to large and small disturbance and more robust to parameter uncertainty. However, the lacks in the system T2FSMC are taking quite a long time in computation and need fuzzy logic reasoning.

  2. Motor-response learning at a process control panel by an autonomous robot

    SciTech Connect

    Spelt, P.F.; de Saussure, G.; Lyness, E.; Pin, F.G.; Weisbin, C.R.

    1988-01-01

    The Center for Engineering Systems Advanced Research (CESAR) was founded at Oak Ridge National Laboratory (ORNL) by the Department of Energy's Office of Energy Research/Division of Engineering and Geoscience (DOE-OER/DEG) to conduct basic research in the area of intelligent machines. Therefore, researchers at the CESAR Laboratory are engaged in a variety of research activities in the field of machine learning. In this paper, we describe our approach to a class of machine learning which involves motor response acquisition using feedback from trial-and-error learning. Our formulation is being experimentally validated using an autonomous robot, learning tasks of control panel monitoring and manipulation for effect process control. The CLIPS Expert System and the associated knowledge base used by the robot in the learning process, which reside in a hypercube computer aboard the robot, are described in detail. Benchmark testing of the learning process on a robot/control panel simulation system consisting of two intercommunicating computers is presented, along with results of sample problems used to train and test the expert system. These data illustrate machine learning and the resulting performance improvement in the robot for problems similar to, but not identical with, those on which the robot was trained. Conclusions are drawn concerning the learning problems, and implications for future work on machine learning for autonomous robots are discussed. 16 refs., 4 figs., 1 tab.

  3. Computerized controller with service display panel for an oil well pumping motor

    SciTech Connect

    Markuson, N.D.; Wiens, T.A.

    1988-08-30

    An oil well pump controller in combination with an oil pumping unit and oil well electrical pump motor for controlling and monitoring the operation of an oil well including: microprocessor means for monitoring three-phase electrical power consumption of the electrical pump motor and for calculating real time demand power consumption of the motor, power measuring means electrically connected to the three-phase electrical input of the motor for producing an analog signal indicative of power consumption, conversion means connected to the power measuring means for converting the analog signal into a digital signal usable by the microprocessor means to calculate electrical power consumption, relay means connected to and receiving signals from the microprocessor means indicative of detected power normal, power overload and power underload conditions, the relay means additionally providing circuitry to allow the microprocessor to selectively switch the motor on or off, waterproof box means for housing the components of the oil well pump controller, the waterproof box including a service display panel, overload display means, mounted on the service display panel, which is clearly visible from a distance, and connected to the relay means for indicating when power consumption of the motor has exceeded preprogrammed limits.

  4. Alarm fatigue: a patient safety concern.

    PubMed

    Sendelbach, Sue; Funk, Marjorie

    2013-01-01

    Research has demonstrated that 72% to 99% of clinical alarms are false. The high number of false alarms has led to alarm fatigue. Alarm fatigue is sensory overload when clinicians are exposed to an excessive number of alarms, which can result in desensitization to alarms and missed alarms. Patient deaths have been attributed to alarm fatigue. Patient safety and regulatory agencies have focused on the issue of alarm fatigue, and it is a 2014 Joint Commission National Patient Safety Goal. Quality improvement projects have demonstrated that strategies such as daily electrocardiogram electrode changes, proper skin preparation, education, and customization of alarm parameters have been able to decrease the number of false alarms. These and other strategies need to be tested in rigorous clinical trials to determine whether they reduce alarm burden without compromising patient safety. PMID:24153215

  5. Monitor alarm fatigue: an integrative review.

    PubMed

    Cvach, Maria

    2012-01-01

    Alarm fatigue is a national problem and the number one medical device technology hazard in 2012. The problem of alarm desensitization is multifaceted and related to a high false alarm rate, poor positive predictive value, lack of alarm standardization, and the number of alarming medical devices in hospitals today. This integrative review synthesizes research and non-research findings published between 1/1/2000 and 10/1/2011 using The Johns Hopkins Nursing Evidence-Based Practice model. Seventy-two articles were included. Research evidence was organized into five main themes: excessive alarms and effects on staff; nurse's response to alarms; alarm sounds and audibility; technology to reduce false alarms; and alarm notification systems. Non-research evidence was divided into two main themes: strategies to reduce alarm desensitization, and alarm priority and notification systems. Evidence-based practice recommendations and gaps in research are summarized. PMID:22839984

  6. An alarm for monitoring CPAP.

    PubMed

    Carter, B; Clare, D; Hochmann, M; Osborne, A; Fraser, T

    1993-04-01

    We have built a device for use within the hospital and at home that is designed to warn of circuit disconnection when used in conjunction with continuous positive airway pressure (CPAP) therapy delivered via ventilators or CPAP generating systems. The Royal Children's Hospital CPAP alarm is a compact, battery operated alarm and monitor of circuit pressure. The device includes intrinsic safety features including a safety blow-off valve, a high pressure alarm and design features that make the device practical, safe and easy to use by both trained hospital personnel and home care attendants with limited training. PMID:8517514

  7. 46 CFR 153.438 - Cargo pressure or temperature alarms required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... vapor pressure described in § 153.371(b); or (2) An alarm that operates when the cargo's temperature... 46 Shipping 5 2010-10-01 2010-10-01 false Cargo pressure or temperature alarms required. 153.438... Equipment Cargo Temperature Control Systems § 153.438 Cargo pressure or temperature alarms required....

  8. 46 CFR 153.438 - Cargo pressure or temperature alarms required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... vapor pressure described in § 153.371(b); or (2) An alarm that operates when the cargo's temperature... 46 Shipping 5 2012-10-01 2012-10-01 false Cargo pressure or temperature alarms required. 153.438... Equipment Cargo Temperature Control Systems § 153.438 Cargo pressure or temperature alarms required....

  9. 46 CFR 153.438 - Cargo pressure or temperature alarms required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... vapor pressure described in § 153.371(b); or (2) An alarm that operates when the cargo's temperature... 46 Shipping 5 2013-10-01 2013-10-01 false Cargo pressure or temperature alarms required. 153.438... Equipment Cargo Temperature Control Systems § 153.438 Cargo pressure or temperature alarms required....

  10. 46 CFR 169.732 - Carbon dioxide and clean agent alarms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Carbon dioxide and clean agent alarms. 169.732 Section... SCHOOL VESSELS Vessel Control, Miscellaneous Systems, and Equipment Markings § 169.732 Carbon dioxide and clean agent alarms. (a) Each carbon dioxide or clean agent fire extinguishing alarm must...

  11. 46 CFR 169.732 - Carbon dioxide and clean agent alarms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Carbon dioxide and clean agent alarms. 169.732 Section... SCHOOL VESSELS Vessel Control, Miscellaneous Systems, and Equipment Markings § 169.732 Carbon dioxide and clean agent alarms. (a) Each carbon dioxide or clean agent fire extinguishing alarm must...

  12. 46 CFR 169.732 - Carbon dioxide and clean agent alarms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Carbon dioxide and clean agent alarms. 169.732 Section... SCHOOL VESSELS Vessel Control, Miscellaneous Systems, and Equipment Markings § 169.732 Carbon dioxide and clean agent alarms. (a) Each carbon dioxide or clean agent fire extinguishing alarm must...

  13. Ultrasonic Technology in Duress Alarms.

    ERIC Educational Resources Information Center

    Lee, Martha A.

    2000-01-01

    Provides the pros and cons of the most commonly used technologies in personal duress alarm systems in the school environment. Discussed are radio frequency devices, infrared systems, and ultrasonic technology. (GR)

  14. Research on the Calculated Methods of Active Control Value for Antenna Panel Deformations under Gravity

    NASA Astrophysics Data System (ADS)

    Fu, L.; Zhong, W. Y.; Qiao, H. H.; Liu, G. X.; Qian, H. L.

    2015-07-01

    The methods of ideal reflector surface, two-parameter, five-parameter, and six-parameter best-fit paraboloid are presented in this paper. Based on these methods, the adjustment values of gravity deformations are calculated for the main reflector of large-scale Cassegrain antenna. Accordingly, the positions of subreflector are corrected, and the effects of offset-focus on electric performance are also analyzed. Taking Shanghai 65 m antenna as a research object, the adjustment values of actuator and hexapod, the accuracy of the main reflector surface, and the pointing error after offsetting the focus are contrasted. As a result, the method of six-parameter best-fit paraboloid is ideal to calculate active control value for antenna panels after the effects of feed defocus have been adjusted and modified. The results offer data for the active control of antenna.

  15. Functional relationship-based alarm processing

    DOEpatents

    Corsberg, Daniel R.

    1988-01-01

    A functional relationship-based alarm processing system and method analyzes each alarm as it is activated and determines its relative importance with other currently activated alarms and signals in accordance with the relationships that the newly activated alarm has with other currently activated alarms. Once the initial level of importance of the alarm has been determined, that alarm is again evaluated if another related alarm is activated. Thus, each alarm's importance is continuously oupdated as the state of the process changes during a scenario. Four hierarchical relationships are defined by this alarm filtering methodology: (1) level precursor (usually occurs when there are two alarm settings on the same parameter); (2) direct precursor (based on caussal factors between two alarms); (3) required action (system response or action) expected within a specified time following activation of an alarm or combination of alarms and process signals); and (4) blocking condition (alarms that are normally expected and are not considered important). The alarm processing system and method is sensitive to the dynamic nature of the process being monitored and is capable of changing the relative importance of each alarm as necessary.

  16. Functional relationship-based alarm processing system

    DOEpatents

    Corsberg, Daniel R.

    1989-01-01

    A functional relationship-based alarm processing system and method analyzes each alarm as it is activated and determines its relative importance with other currently activated alarms and signals in accordance with the functional relationships that the newly activated alarm has with other currently activated alarms. Once the initial level of importance of the alarm has been determined, that alarm is again evaluated if another related alarm is activated or deactivated. Thus, each alarm's importance is continuously updated as the state of the process changes during a scenario. Four hierarchical relationships are defined by this alarm filtering methodology: (1) level precursor (usually occurs when there are two alarm settings on the same parameter); (2) direct precursor (based on causal factors between two alarms); (3) required action (system response or action expected within a specified time following activation of an alarm or combination of alarms and process signals); and (4) blocking condition (alarms that are normally expected and are not considered important). The alarm processing system and method is sensitive to the dynamic nature of the process being monitored and is capable of changing the relative importance of each alarm as necessary.

  17. Functional relationship-based alarm processing system

    DOEpatents

    Corsberg, D.R.

    1988-04-22

    A functional relationship-based alarm processing system and method analyzes each alarm as it is activated and determines its relative importance with other currently activated alarms and signals in accordance with the functional relationships that the newly activated alarm has with other currently activated alarms. Once the initial level of importance of the alarm has been determined, that alarm is again evaluated if another related alarm is activated or deactivated. Thus, each alarm's importance is continuously updated as the state of the process changes during a scenario. Four hierarchical relationships are defined by this alarm filtering methodology: (1) level precursor (usually occurs when there are two alarm settings on the same parameter); (2) direct precursor (based on causal factors between two alarms); (3) required action (system response or action expected within a specified time following activation of an alarm or combination of alarms and process signals); and (4) blocking condition (alarms that are normally expected and are not considered important). The alarm processing system and method is sensitive to the dynamic nature of the process being monitored and is capable of changing the relative importance of each alarm as necessary. 12 figs.

  18. Field verification of predator attraction to minnow alarm substance.

    PubMed

    Wisenden, Brian D; Thiel, Travis A

    2002-02-01

    Fishes such as minnows in the superorder Ostariophysi possess specialized alarm substance cells (ASC) that contain an alarm cue. Alarm substance can only be released by damage to the epidermis; thus, the release of alarm substance is a reliable indicator of predation risk. When nearby minnows detect the cue, they adopt a range of antipredator behaviors that reduce their probability of predation. Predator-predator interactions afford prey an opportunity to escape and, thus, a fitness benefit that maintains alarm substance calls over evolutionary time. Here, we present data from a simple field experiment verifying that nearby predators are attracted to minnow alarm substance because it signals an opportunity to pirate a meal. Fishing lures were baited with sponge blocks scented with either (1) water (control for sponge odor and appearance), (2) skin extract from non-ostariophysan convict cichlids (superorder Acanthopterygii, Archocentrus "Cichlasoma" nigrofasciatus) to control for general injury-released cues from fish, or (3) skin extract from fathead minnows (superorder Ostariophysi, Pimephales promelas). Predator strike frequency on each sponge type was 1, 1, and 7 for water, cichlid, and minnow cues, respectively. These data provide the first field test using fish predators of the predator-attraction hypothesis for the evolution of Ostariophysan alarm substance cells. PMID:11925077

  19. Use of pagers with an alarm escalation system to reduce cardiac monitor alarm signals.

    PubMed

    Cvach, Maria M; Frank, Robert J; Doyle, Pete; Stevens, Zeina Khouri

    2014-01-01

    Alarm fatigue desensitizes nurses to alarm signals and presents potential for patient harm. This project describes an innovative method of communicating cardiac monitor alarms to pagers using an alarm escalation algorithm. This innovation was tested on 2 surgical progressive care units over a 6-month period. There was a significant decrease in mean frequency and duration of high-priority monitor alarms and improvement in nurses' perception of alarm response time, using this method of alarm communication. PMID:23963169

  20. 75 FR 55803 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Epi-Centers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-14

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Epi-Centers for the Prevention of Healthcare- Associated...

  1. 75 FR 69686 - Disease, Disability, and Injury Prevention and Control; Special Emphasis Panel: Epi-Centers for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and Control; Special Emphasis Panel: Epi-Centers for the Prevention of Healthcare-Associated...

  2. Computational Human Performance Modeling For Alarm System Design

    SciTech Connect

    Jacques Hugo

    2012-07-01

    The introduction of new technologies like adaptive automation systems and advanced alarms processing and presentation techniques in nuclear power plants is already having an impact on the safety and effectiveness of plant operations and also the role of the control room operator. This impact is expected to escalate dramatically as more and more nuclear power utilities embark on upgrade projects in order to extend the lifetime of their plants. One of the most visible impacts in control rooms will be the need to replace aging alarm systems. Because most of these alarm systems use obsolete technologies, the methods, techniques and tools that were used to design the previous generation of alarm system designs are no longer effective and need to be updated. The same applies to the need to analyze and redefine operators’ alarm handling tasks. In the past, methods for analyzing human tasks and workload have relied on crude, paper-based methods that often lacked traceability. New approaches are needed to allow analysts to model and represent the new concepts of alarm operation and human-system interaction. State-of-the-art task simulation tools are now available that offer a cost-effective and efficient method for examining the effect of operator performance in different conditions and operational scenarios. A discrete event simulation system was used by human factors researchers at the Idaho National Laboratory to develop a generic alarm handling model to examine the effect of operator performance with simulated modern alarm system. It allowed analysts to evaluate alarm generation patterns as well as critical task times and human workload predicted by the system.

  3. Integrating monitor alarms with laboratory test results to enhance patient deterioration prediction.

    PubMed

    Bai, Yong; Do, Duc H; Harris, Patricia Rae Eileen; Schindler, Daniel; Boyle, Noel G; Drew, Barbara J; Hu, Xiao

    2015-02-01

    Patient monitors in modern hospitals have become ubiquitous but they generate an excessive number of false alarms causing alarm fatigue. Our previous work showed that combinations of frequently co-occurring monitor alarms, called SuperAlarm patterns, were capable of predicting in-hospital code blue events at a lower alarm frequency. In the present study, we extend the conceptual domain of a SuperAlarm to incorporate laboratory test results along with monitor alarms so as to build an integrated data set to mine SuperAlarm patterns. We propose two approaches to integrate monitor alarms with laboratory test results and use a maximal frequent itemsets mining algorithm to find SuperAlarm patterns. Under an acceptable false positive rate FPRmax, optimal parameters including the minimum support threshold and the length of time window for the algorithm to find the combinations of monitor alarms and laboratory test results are determined based on a 10-fold cross-validation set. SuperAlarm candidates are generated under these optimal parameters. The final SuperAlarm patterns are obtained by further removing the candidates with false positive rate>FPRmax. The performance of SuperAlarm patterns are assessed using an independent test data set. First, we calculate the sensitivity with respect to prediction window and the sensitivity with respect to lead time. Second, we calculate the false SuperAlarm ratio (ratio of the hourly number of SuperAlarm triggers for control patients to that of the monitor alarms, or that of regular monitor alarms plus laboratory test results if the SuperAlarm patterns contain laboratory test results) and the work-up to detection ratio, WDR (ratio of the number of patients triggering any SuperAlarm patterns to that of code blue patients triggering any SuperAlarm patterns). The experiment results demonstrate that when varying FPRmax between 0.02 and 0.15, the SuperAlarm patterns composed of monitor alarms along with the last two laboratory test results

  4. Design and fabrication of large suction panels with perforated surfaces for laminar flow control testing in a transonic wind tunnel

    NASA Technical Reports Server (NTRS)

    Maddalon, D. V.; Poppen, W. A., Jr.

    1986-01-01

    Considerable progress has been made in the development of perforated suction surface material for laminar flow control applications. Electron-beam perforated titaniuum skin was used as the suction surface. Critical issues related to suction panel manufacturing were identified and largely resolved. The final product included fabrication of a 7-foot chord by 7-foot span perforated laminar flow control wind tunnel model. Techniques used can be adapted to modern aircraft production lines. The report includes details on panel instrumentation and other features required for testing in a transonic pressure tunnel.

  5. Human factors engineering guidance for the review of advanced alarm systems

    SciTech Connect

    O`Hara, J.M.; Brown, W.S.; Higgins, J.C.; Stubler, W.F.

    1994-09-01

    This report provides guidance to support the review of the human factors aspects of advanced alarm system designs in nuclear power plants. The report is organized into three major sections. The first section describes the methodology and criteria that were used to develop the design review guidelines. Also included is a description of the scope, organization, and format of the guidelines. The second section provides a systematic review procedure in which important characteristics of the alarm system are identified, described, and evaluated. The third section provides the detailed review guidelines. The review guidelines are organized according to important characteristics of the alarm system including: alarm definition; alarm processing and reduction; alarm prioritization and availability; display; control; automated; dynamic, and modifiable characteristics; reliability, test, maintenance, and failure indication; alarm response procedures; and control-display integration and layout.

  6. 76 FR 28438 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-17

    ... Care Act (ACA): Childhood Obesity Research Funding Opportunity Announcement (FOA) DP11- 007, Panel B... evaluation of ``Affordable Care Act (ACA): Childhood Obesity Research Funding Opportunity Announcement...

  7. Research on the fire alarming system of fiber grating

    NASA Astrophysics Data System (ADS)

    Qi, Yaobin

    2007-09-01

    The application of fiber grating sensing technology in fire alarming based on temperature detection has the advantages of high accuracy, high reliability and strong immunity from electronic and magnetic fields. It is especially advantageous to use this system in the petroleum and chemistry industry because it can provide an extraordinary safe means for the fire alarm. But due to the traditional optical Wavelength Division Multiplexing (WDM) technology is limited by the optic source bandwidth, the number of its multiplexing points is few. In this paper WDM technology will be developed mixing with Identified Bragg, which is called Identified and Wavelength Multiplexing, to build the Fiber Grating (FBG) fire alarm system integrated with computers. Some technologies applied in fire alarming system of fiber grating such as the transmission of test signals which pass through modulate and demodulate, the disposal of software system, the output of control signal and the strong ability of anti-disturbance have been studied and discussed.

  8. Wireless intelligent alarm technology with pyroelectric infrared sensor

    NASA Astrophysics Data System (ADS)

    Chen, Xiao

    2009-07-01

    Aiming at the defects of monitoring conducted by man in the conventional practice, we study the passive intelligent automatic alarm technology based on the pyroelectric infrared sensor and wireless communication technology. The designed passive infrared wireless alarm is composed of pyroelectric infrared sensors, infrared special chip BISS0001 and their peripheral circuits. When someone enters into the detecting and monitoring range, the alarm will detect the infrared ray of the human radiation by the contactless form and detect the signals of circuit output. Then it translates them into low frequency signals relative with human sports speed, distance and direction, produce corresponding output signals through amplifying by the back state controller, switch on the work power of the wireless transmitting circuit and make it emit the alarm signals. The system enhances the monitoring level and effects and possesses many advantages such as wide detecting range, long detecting distance and high reliability.

  9. Adolescents' Internalizing and Aggressive Behaviors and Perceptions of Parents' Psychological Control: A Panel Study Examining Direction of Effects

    ERIC Educational Resources Information Center

    Albrecht, Arne K.; Galambos, Nancy L.; Jansson, S. Mikael

    2007-01-01

    This panel study investigated the directionality of relations between adolescents' perceptions of their parents' psychological control and adolescents' self-reported internalizing and aggressive (physical and relational) behaviors. Data were collected from a random, community sample of 530 adolescents ages 12-19 years old at time 1, and again 2…

  10. Increasing smoke alarm operability through theory-based health education: a randomised trial

    PubMed Central

    Miller, Ted R; Bergen, Gwen; Ballesteros, Michael F; Bhattacharya, Soma; Gielen, Andrea Carlson; Sheppard, Monique S

    2015-01-01

    Background Although working smoke alarms halve deaths in residential fires, many households do not keep alarms operational. We tested whether theory-based education increases alarm operability. Methods Randomised multiarm trial, with a single arm randomly selected for use each day, in low-income neighbourhoods in Maryland, USA. Intervention arms: (1) Full Education combining a health belief module with a social-cognitive theory module that provided hands-on practice installing alarm batteries and using the alarm’s hush button; (2) Hands-on Practice social-cognitive module supplemented by typical fire department education; (3) Current Norm receiving typical fire department education only. Four hundred and thirty-six homes recruited through churches or by knocking on doors in 2005–2008. Followup visits checked alarm operability in 370 homes (85%) 1–3.5 years after installation. Main outcome measures: number of homes with working alarms defined as alarms with working batteries or hard-wired and number of working alarms per home. Regressions controlled for alarm status preintervention; demographics and beliefs about fire risks and alarm effectiveness. Results Homes in the Full Education and Practice arms were more likely to have a functioning smoke alarm at follow-up (OR=2.77, 95% CI 1.09 to 7.03) and had an average of 0.32 more working alarms per home (95% CI 0.09 to 0.56). Working alarms per home rose 16%. Full Education and Practice had similar effectiveness (p=0.97 on both outcome measures). Conclusions Without exceeding typical fire department installation time, installers can achieve greater smoke alarm operability. Hands-on practice is key. Two years after installation, for every three homes that received hands-on practice, one had an additional working alarm. Trial registration number http://www.clinicaltrials.gov number NCT00139126. PMID:25165090

  11. Xcel Energy implements an alarm management strategy

    SciTech Connect

    Bass, J.; Abreu, G.

    2007-11-15

    Not so long ago, Xcel Energy's Pawnee Station, a 505 MW coal-fired generating station in Brush, Colorado, USA was commonly generating 300 to 400 alarms per 8-hour shift. The article describes how the alarm system was revised and improved by tackling alarm dead-bands, and rationalising alarms for routine events. Operators are trained to understand the functions of alarm management components, their use and response, and obtain feedback. Today the power station reports about one alarm per hour. 3 photos.

  12. System requirements for one-time-use ENRAF control panel software

    SciTech Connect

    HUBER, J.H.

    1999-08-19

    An Enraf Densitometer is installed on tank 241-AY-102. The Densitometer will frequently be tasked to obtain and log density profiles. The activity can be effected a number of ways. Enraf Incorporated provides a software package called ''Logger18'' to its customers for the purpose of in-shop testing of their gauges. Logger18 is capable of accepting an input file which can direct the gauge to obtain a density profile for a given tank level and bottom limit. Logger18 is a complex, DOS based program which will require trained technicians and/or tank farm entries to obtain the data. ALARA considerations have prompted the development of a more user-friendly, computer-based interface to the Enraf densitometers. This document records the plan by which this new Enraf data acquisition software will be developed, reviewed, verified, and released. This plan applies to the development and implementation of a one-time-use software program, which will be called ''Enraf Control Panel.'' The software will be primarily used for remote operation of Enraf Densitometers for the purpose of obtaining and logging tank product density profiles.

  13. Architectural Panels

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Alliance Wall Corporation's Whyteboard, a porcelain enamel on steel panels wall board, owes its color stability to a KIAC engineering background study to identify potential technologies and manufacturers of equipment which could be used to detect surface flaws. One result of the data base search was the purchase of a spectrocolorimeter which enables the company to control some 250 standard colors, and match special colors.

  14. Experimental Evaluation of Tuned Chamber Core Panels for Payload Fairing Noise Control

    NASA Technical Reports Server (NTRS)

    Schiller, Noah H.; Allen, Albert R.; Herlan, Jonathan W.; Rosenthal, Bruce N.

    2015-01-01

    Analytical models have been developed to predict the sound absorption and sound transmission loss of tuned chamber core panels. The panels are constructed of two facesheets sandwiching a corrugated core. When ports are introduced through one facesheet, the long chambers within the core can be used as an array of low-frequency acoustic resonators. To evaluate the accuracy of the analytical models, absorption and sound transmission loss tests were performed on flat panels. Measurements show that the acoustic resonators embedded in the panels improve both the absorption and transmission loss of the sandwich structure at frequencies near the natural frequency of the resonators. Analytical predictions for absorption closely match measured data. However, transmission loss predictions miss important features observed in the measurements. This suggests that higher-fidelity analytical or numerical models will be needed to supplement transmission loss predictions in the future.

  15. 78 FR 19490 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... Dementia and Co- occurring Chronic Conditions among Older Adults, SIP13-072, Panel E, initial review. In... Measures for Public Health Practice, SIP13-071; and Expanding Information about Dementia and...

  16. Improved alarm tracking for better accountability

    SciTech Connect

    Nemesure, S.; Marr, G.; Shrey, T.; Kling, N.; Hammons, L.; Ingrassia, P.; D'Ottavio, T.

    2011-03-28

    An alarm system is a vital component of any accelerator, as it provides a warning that some element of the system is not functioning properly. The severity and age of the alarm may sometimes signify whether urgent or deferred attention is required. For example, older alarms may be given a lower priority if an assumption is made that someone else is already investigating it, whereas those of higher severity or alarms that are more current may indicate the need for an immediate response. The alarm history also provides valuable information regarding the functionality of the overall system, thus careful tracking of these data is likely to improve response time, remove uncertainty about the current status and assist in the ability to promptly respond to the same warning/trigger in the future. Since one goal of every alarm display is to be free of alarms, a clear and concise presentation of an alarm along with useful historic annotations can help the end user address the warning more quickly, thus expediting the elimination of such alarm conditions. By defining a discrete set of very specific alarm management states and by utilizing database resources to maintain a complete and easily accessible alarm history, we anticipate facilitated work flow due to more efficient operator response and management of alarms.

  17. 24 CFR 3285.703 - Smoke alarms.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Smoke alarms. 3285.703 Section 3285... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.703 Smoke alarms. Smoke alarms must be functionally tested in accordance with applicable requirements of the...

  18. 24 CFR 3285.703 - Smoke alarms.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Smoke alarms. 3285.703 Section 3285... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.703 Smoke alarms. Smoke alarms must be functionally tested in accordance with applicable requirements of the...

  19. 24 CFR 3285.703 - Smoke alarms.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Smoke alarms. 3285.703 Section 3285... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.703 Smoke alarms. Smoke alarms must be functionally tested in accordance with applicable requirements of the...

  20. 24 CFR 3285.703 - Smoke alarms.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Smoke alarms. 3285.703 Section 3285... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.703 Smoke alarms. Smoke alarms must be functionally tested in accordance with applicable requirements of the...

  1. 24 CFR 3285.703 - Smoke alarms.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Smoke alarms. 3285.703 Section 3285... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.703 Smoke alarms. Smoke alarms must be functionally tested in accordance with applicable requirements of the...

  2. 30 CFR 77.311 - Alarm devices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Alarm devices. 77.311 Section 77.311 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY....311 Alarm devices. Thermal dryer systems shall be equipped with both audible and visual alarm...

  3. 30 CFR 77.311 - Alarm devices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Alarm devices. 77.311 Section 77.311 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY....311 Alarm devices. Thermal dryer systems shall be equipped with both audible and visual alarm...

  4. 21 CFR 870.1025 - Arrhythmia detector and alarm (including ST-segment measurement and alarm).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Arrhythmia detector and alarm (including ST... Diagnostic Devices § 870.1025 Arrhythmia detector and alarm (including ST-segment measurement and alarm). (a) Identification. The arrhythmia detector and alarm device monitors an electrocardiogram and is designed to...

  5. 21 CFR 870.1025 - Arrhythmia detector and alarm (including ST-segment measurement and alarm).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Arrhythmia detector and alarm (including ST... Diagnostic Devices § 870.1025 Arrhythmia detector and alarm (including ST-segment measurement and alarm). (a) Identification. The arrhythmia detector and alarm device monitors an electrocardiogram and is designed to...

  6. 21 CFR 870.1025 - Arrhythmia detector and alarm (including ST-segment measurement and alarm).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Arrhythmia detector and alarm (including ST... Diagnostic Devices § 870.1025 Arrhythmia detector and alarm (including ST-segment measurement and alarm). (a) Identification. The arrhythmia detector and alarm device monitors an electrocardiogram and is designed to...

  7. 21 CFR 870.1025 - Arrhythmia detector and alarm (including ST-segment measurement and alarm).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Arrhythmia detector and alarm (including ST... Diagnostic Devices § 870.1025 Arrhythmia detector and alarm (including ST-segment measurement and alarm). (a) Identification. The arrhythmia detector and alarm device monitors an electrocardiogram and is designed to...

  8. 21 CFR 870.1025 - Arrhythmia detector and alarm (including ST-segment measurement and alarm).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Arrhythmia detector and alarm (including ST... Diagnostic Devices § 870.1025 Arrhythmia detector and alarm (including ST-segment measurement and alarm). (a) Identification. The arrhythmia detector and alarm device monitors an electrocardiogram and is designed to...

  9. Alarm pheromone processing in the ant brain: an evolutionary perspective.

    PubMed

    Mizunami, Makoto; Yamagata, Nobuhiro; Nishino, Hiroshi

    2010-01-01

    Social insects exhibit sophisticated communication by means of pheromones, one example of which is the use of alarm pheromones to alert nestmates for colony defense. We review recent advances in the understanding of the processing of alarm pheromone information in the ant brain. We found that information about formic acid and n-undecane, alarm pheromone components, is processed in a set of specific glomeruli in the antennal lobe of the ant Camponotus obscuripes. Alarm pheromone information is then transmitted, via projection neurons (PNs), to the lateral horn and the calyces of the mushroom body of the protocerebrum. In the lateral horn, we found a specific area where terminal boutons of alarm pheromone-sensitive PNs are more densely distributed than in the rest of the lateral horn. Some neurons in the protocerebrum responded specifically to formic acid or n-undecane and they may participate in the control of behavioral responses to each pheromone component. Other neurons, especially those originating from the mushroom body lobe, responded also to non-pheromonal odors and may play roles in integration of pheromonal and non-pheromonal signals. We found that a class of neurons receive inputs in the lateral horn and the mushroom body lobe and terminate in a variety of premotor areas. These neurons may participate in the control of aggressive behavior, which is sensitized by alarm pheromones and is triggered by non-pheromonal sensory stimuli associated with a potential enemy. We propose that the alarm pheromone processing system has evolved by differentiation of a part of general odor processing system. PMID:20676235

  10. Evaluating alternative responses to safeguards alarms

    SciTech Connect

    Al-Ayat, R.A.; Judd, B.R.; McCord, R.K.

    1982-04-15

    This paper describes a quantitative approach to help evaluate and respond to safeguards alarms. These alarms may be generated internally by a facility's safeguards systems or externally by individuals claiming to have stolen special nuclear material (SNM). This approach can be used to identify the most likely cause of an alarm - theft, hoax, or error - and to evaluate alternative responses to alarms. Possible responses include conducting investigations, initiating measures to recover stolen SNM, and replying to external threats. Based on the results of each alarm investigation step, the evaluation revises the likelihoods of possible causes of an alarm, and uses this information to determine the optimal sequence of further responses. The choice of an optimal sequence of responses takes into consideration the costs and benefits of successful thefts or hoaxes. These results provide an analytical basis for setting priorities and developing contingency plans for responding to safeguards alarms.

  11. Low frequency noise as a control test for spacial solar panels

    NASA Astrophysics Data System (ADS)

    Orsal, B.; Alabedra, R.; Ruas, R.

    1986-07-01

    The present study of low frequency noise in a forward-biased dark solar cell, in order to develop an NDE test method for solar panels, notes that a single cell with a given defect is thus detectable under dark conditions. The test subject was a space solar panel consisting of five cells in parallel and five in series; these cells are of the n(+)-p monocrystalline Si junction type. It is demonstrated that the noise associated with the defective cell is 10-15 times higher than that of a good cell. Replacement of a good cell by a defective one leads to a 30-percent increase in the noise level of the panel as a whole.

  12. Control device for automatic orientation of a solar panel based on a microcontroller (PIC16f628a)

    NASA Astrophysics Data System (ADS)

    Rezoug, M. R.; Krama, A.

    2016-07-01

    This work proposes a control device for autonomous solar tracker based on one axis, It consists of two main parts; the control part which is based on "the PIC16f628a"; it has the role of controlling, measuring and plotting responses. The second part is a mechanical device, which has the role of making the solar panel follows the day-night change of the sun throughout the year. Both parties are established to improve energy generation of the photovoltaic panels. In this paper, we will explain the main operating principles of our system. Also, we will provide experimental results which demonstrate the good performance and the efficiency of this system. This innovation is different from what has been proposed in previous studies. The important points of this system are maximum output energy and minimum energy consumption of solar tracker, its cost is relatively low with simplicity in implementation. The average power increase produced by using the tracking system for a particular day, is over 30 % compared with the static panel.

  13. Video systems for alarm assessment

    SciTech Connect

    Greenwoll, D.A.; Matter, J.C. ); Ebel, P.E. )

    1991-09-01

    The purpose of this NUREG is to present technical information that should be useful to NRC licensees in designing closed-circuit television systems for video alarm assessment. There is a section on each of the major components in a video system: camera, lens, lighting, transmission, synchronization, switcher, monitor, and recorder. Each section includes information on component selection, procurement, installation, test, and maintenance. Considerations for system integration of the components are contained in each section. System emphasis is focused on perimeter intrusion detection and assessment systems. A glossary of video terms is included. 13 figs., 9 tabs.

  14. Alarm sensor apparatus for closures

    DOEpatents

    Carlson, James A.; Stoddard, Lawrence M.

    1986-01-01

    An alarm sensor apparatus for closures such as doors and windows, and particularly for closures having loose tolerances such as overhead doors, garage doors or the like, the sensor apparatus comprising a pair of cooperating bracket members, one being attached to the door facing or frame work and the other to the door member, two magnetic sensor elements carried by said bracket members, the bracket members comprising a pair of cooperating orthogonal guide slots and plates and a stop member engageable with one of the sensors for aligning the sensors with respect to each other in all three orthogonal planes when the door is closed.

  15. MRDIS Standalone Central Alarm Station

    SciTech Connect

    2012-09-12

    The MRDIS Standalone Central Alarm Station(MRDIS-CAS} is a software system for receiving, storing, and reviewing radiation data collected by the Mobile Radiation Detection and Identification System (MRDIS}, a mobile radiation scanning system developed for use in foreign ports for the DOE Megaports Initiative. It is designed to run on one of the on board computers in the MRDIS cab. It will collect, store, and display data from the MRDIS without the need for wireless communications or centralized server technology. It is intended to be a lightweight replacement for a distributed Megaports communication system in ports where the necessary communications infrastructure does not exist for a full Megaports communications system.

  16. Alarm sensor apparatus for closures

    DOEpatents

    Carlson, J.A.; Stoddard, L.M.

    1984-01-31

    An alarm sensor apparatus for closures such as doors and windows, and particularly for closures having loose tolerances such as overhead doors, garage doors or the like, the sensor apparatus comprising a pair of cooperating bracket members, one being attached to the door facing or framework and the other to the door member, two magnetic sensor elements carried by said bracket members, the bracket members comprising a pair of cooperating orthogonal guide slots and plates and a stop member engageable with one of the sensors for aligning the sensors with respect to each other in all three orthogonal planes when the door is closed.

  17. The actuated performance of multi-layer piezoelectric actuator in active vibration control of honeycomb sandwich panel

    NASA Astrophysics Data System (ADS)

    Luo, Yajun; Xie, Shilin; Zhang, Xinong

    2008-11-01

    This paper discusses the use of the multi-layer piezoelectric actuator (MPA) in the active vibration control of the honeycomb sandwich panel (HSP). A literature overview of the available works is first presented. And the main motivation using the MPA in the AVC of HSP is discussed. Then, the honeycomb core is in advance treated as an orthotropic plate. The governing equations of the system are derived by the Hamilton principle on the basis of both displacement and transverse tress assumptions. The formulations of the actuation force/moment are obtained and indicate that the actuation force/moment are two four-order polynomial function of the piezoelectric layers number. Finally, active control experiments of a cantilever honeycomb sandwich panel (CHSP) are performed using the MPA. The control law of proportional velocity feedback is adopted in the experiments. These experiments include the resonant vibration control and the sinusoidal swept of the control system at the case of different piezoelectric layers number. The results show that the MPA can effectively control the vibration of the high damping HSP, and the control performance per voltage by the proposed actuator can be improved significantly through increasing the piezoelectric patch number. Consequently, the MPA exhibits better actuation capability than that with only single layer.

  18. Juvenile Crime, Juvenile Justice. Panel on Juvenile Crime: Prevention, Treatment, and Control.

    ERIC Educational Resources Information Center

    McCord, Joan, Ed.; Widom, Cathy Spatz, Ed.; Crowell, Nancy A., Ed.

    This book discusses patterns and trends in crimes committed by children and adolescents, analyzing youth crime as a subset of general crime and studying the impact of race and gender. It evaluates different approaches to forecasting future crime rates. Data come from a national panel that examined what is known about juvenile crime and its…

  19. Noise control of dipole source by using micro-perforated panel housing

    NASA Astrophysics Data System (ADS)

    Xi, Q.; Choy, Y. S.; Cheng, L.; Tang, S. K.

    2016-02-01

    Mitigating low-frequency noise in a small ducted fan system such as hairdryer is still a technical challenge. Traditional duct lining with porous materials work ineffectively due to the limitation of its thickness and length of small domestic product with ducted fans. This study presents a passive approach to directly suppress the sound radiation from the fan housed by a short microperforated panel covered with a shallow cavity backing. The noise suppression is achieved by the sound cancellation between sound fields from a fan of a dipole nature and sound radiation from a vibrating panel via vibro-acoustic coupling and by sound absorption in micro-perforations to widen the stopband. A two-dimensional theoretical model, capable of dealing with strong coupling among the vibrating micro-perforated panel, sound radiation from the dipole source, sound fields inside the cavity and the duct is developed. Through modal analysis, it is found that the even modes of the panel vibration are very important to cancel the sound radiation from the dipole source. Experimental validation is conducted with a loudspeaker to simulate the dipole source, and good agreement between the predicted and measured insertion loss (IL) is achieved.

  20. 76 FR 13621 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel; Teleconference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-14

    ... Special Emphasis Panel (SEP): Pilot for State-specific Cross-Sectional Surveillance of Persons with Rare... Pilot Longitudinal Data Collection to Inform Public Health--Fragile X Syndrome, FOA DD11-007, initial... ``Pilot for State-specific Cross- Sectional Surveillance of Persons with Rare Disorders and...

  1. Development of an on-line expert system for integrated alarm processing in nuclear power plants

    SciTech Connect

    Kim, Han Gon; Choi, Seong Soo; Kang, Ki Sig; Chang, Soon Heung

    1994-12-31

    An on-line expert system, called AFDS (Alarm Filtering and Diagnostic System), has been developed to assist operators in effectively maintaining plant safety and to enhance plant availability using advanced computer technologies for alarm processing. The AFDS is designed to perform alarm filtering and overall plantwide diagnosis when an abnormal state occurs. in addition to these functions, it carries out alarm prognosis to provide the operator with prediction-based messages and to generate high-level alarms that can be used as another diagnostic information. The system is developed on a SUN SPARC 2 workstation, and its target domain is the alarm system in the main control room of Yonggwang units 1 and 2.

  2. Evaluation of the FilmArray Blood Culture Identification Panel: Results of a Multicenter Controlled Trial

    PubMed Central

    Salimnia, Hossein; Lephart, Paul R.; Schreckenberger, Paul; DesJarlais, Sharon M.; Johnson, J. Kristie; Robinson, Gwen; Carroll, Karen C.; Greer, Amy; Morgan, Margie; Chan, Raymond; Loeffelholz, Michael; Valencia-Shelton, Frances; Jenkins, Stephen; Schuetz, Audrey N.; Daly, Judy A.; Barney, Trenda; Hemmert, Andrew; Kanack, Kristen J.

    2016-01-01

    Sepsis is a major cause of morbidity, mortality, and increased medical expense. Rapid diagnosis improves outcomes and reduces costs. The FilmArray blood culture identification panel (BioFire Diagnostics LLC, Salt Lake City, UT), a highly multiplexed PCR assay, can identify 24 etiologic agents of sepsis (8 Gram-positive, 11 Gram-negative, and 5 yeast species) and three antimicrobial resistance genes (mecA, vanA/B, and blaKPC) from positive blood culture bottles. It provides results in about 1 h with 2 min for assay setup. We present the results of an eight-center trial comparing the sensitivity and specificity of the panel with those of the laboratories' standard phenotypic identification techniques, as well as with molecular methods used to distinguish Acinetobacter baumannii from other members of the A. calcoaceticus-A. baumannii complex and to detect antimicrobial resistance genes. Testing included 2,207 positive aerobic blood culture samples, 1,568 clinical and 639 seeded. Samples were tested fresh or were frozen for later testing within 8 h after the bottles were flagged as positive by an automated blood culture system. At least one organism was detected by the panel in 1,382 (88.1%) of the positive clinical specimens. The others contained primarily off-panel organisms. The panel reported multiple organisms in 81 (5.86%) positive clinical specimens. The unresolved blood culture identification sensitivity for all target detections exceeded 96%, except for Klebsiella oxytoca (92.2%), which achieved 98.3% sensitivity after resolution of an unavoidable phenotypic error. The sensitivity and specificity for vanA/B and blaKPC were 100%; those for mecA were 98.4 and 98.3%, respectively. PMID:26739158

  3. Centers for Disease Control and Prevention Expert Panel Meetings on Prevention and Treatment of Anthrax in Adults

    PubMed Central

    Hendricks, Katherine A.; Wright, Mary E.; Shadomy, Sean V.; Bradley, John S.; Morrow, Meredith G.; Pavia, Andy T.; Rubinstein, Ethan; Holty, Jon-Erik C.; Messonnier, Nancy E.; Smith, Theresa L.; Pesik, Nicki; Treadwell, Tracee A.

    2014-01-01

    The Centers for Disease Control and Prevention convened panels of anthrax experts to review and update guidelines for anthrax postexposure prophylaxis and treatment. The panels included civilian and military anthrax experts and clinicians with experience treating anthrax patients. Specialties represented included internal medicine, pediatrics, obstetrics, infectious disease, emergency medicine, critical care, pulmonology, hematology, and nephrology. Panelists discussed recent patients with systemic anthrax; reviews of published, unpublished, and proprietary data regarding antimicrobial drugs and anthrax antitoxins; and critical care measures of potential benefit to patients with anthrax. This article updates antimicrobial postexposure prophylaxis and antimicrobial and antitoxin treatment options and describes potentially beneficial critical care measures for persons with anthrax, including clinical procedures for infected nonpregnant adults. Changes from previous guidelines include an expanded discussion of critical care and clinical procedures and additional antimicrobial choices, including preferred antimicrobial drug treatment for possible anthrax meningitis. PMID:24447897

  4. Alarm toe switch. [Patent application

    DOEpatents

    Ganyard, F.P.

    1980-11-18

    An alarm toe switch inserted within a shoe for energizing an alarm circuit in a covert manner includes an insole mounting pad into which a miniature reed switch is fixedly molded. An elongated slot perpendicular to the reed switch is formed in the bottom surface of the mounting pad. A permanent cylindrical magnet positioned in the forward portion of the slot with a diameter greater than the pad thickness causes a bump above the pad. A foam rubber block is also positioned in the slot rearwardly of the magnet and holds the magnet in normal inoperative relation. A non-magnetic support plate covers the slot and holds the magnet and foam rubber in the slot. The plate minimizes bending and frictional forces to improve movement of the magnet for reliable switch activation. The bump occupies the knuckle space beneath the big toe. When the big toe is scrunched rearwardly the magnet is moved within the slot relative to the reed switch, thus magnetically activating the switch. When toe pressure is released the foam rubber block forces the magnet back into normal inoperative position to deactivate the reed switch.

  5. A TWACS system alarm function for distribution automation

    SciTech Connect

    Mak, S.T.; Radford, D. )

    1994-04-01

    A new application designated as the System Alarm Function'' is made possible by using the Unsolicited Inbound'' capability recently developed for the Two Way Automatic Communication System (TWACS) System-10, which is already used by several electric utilities in the USA for demand side management, remote metering and distribution automation is reviewed here. The UNSOLICITED INBOUND'' algorithm development, the operational issues that are pertinent to the understanding of collisions between multiple alarms and the effects on the alarm response time'' are discussed in detail. This master-to-master relationship between remote transponders in the distribution network and the central control computer opens the door to multiple functional capabilities in the area of distribution automation and remote monitoring.

  6. 46 CFR 130.460 - Placement of machinery alarms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Placement of machinery alarms. 130.460 Section 130.460 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.460...

  7. 46 CFR 130.460 - Placement of machinery alarms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Placement of machinery alarms. 130.460 Section 130.460 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.460...

  8. 46 CFR 130.460 - Placement of machinery alarms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Placement of machinery alarms. 130.460 Section 130.460 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.460...

  9. 46 CFR 130.460 - Placement of machinery alarms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Placement of machinery alarms. 130.460 Section 130.460 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.460...

  10. Alarm system management: evidence-based guidance encouraging direct measurement of informativeness to improve alarm response.

    PubMed

    Rayo, Michael F; Moffatt-Bruce, Susan D

    2015-04-01

    Although there are powerful incentives for creating alarm management programmes to reduce 'alarm fatigue', they do not provide guidance on how to reduce the likelihood that clinicians will disregard critical alarms. The literature cites numerous phenomena that contribute to alarm fatigue, although many of these, including total rate of alarms, are not supported in the literature as factors that directly impact alarm response. The contributor that is most frequently associated with alarm response is informativeness, which is defined as the proportion of total alarms that successfully conveys a specific event, and the extent to which it is a hazard. Informativeness is low across all healthcare applications, consistently ranging from 1% to 20%. Because of its likelihood and strong evidential support, informativeness should be evaluated before other contributors are considered. Methods for measuring informativeness and alarm response are discussed. Design directions for potential interventions, as well as design alternatives to traditional alarms, are also discussed. With the increased attention and investment in alarm system management that alarm interventions are currently receiving, initiatives that focus on informativeness and the other evidence-based measures identified will allow us to more effectively, efficiently and reliably redirect clinician attention, ultimately improving alarm response. PMID:25734193

  11. Analyses of Control Surface Seal Tested in the Ames Arc Jet Tunnel (Panel Test Facility)

    NASA Technical Reports Server (NTRS)

    Reich, Alton J.; Athavale, Mahesh; Dunlap, Patrick H., Jr.; Steinetz, Bruce M.; Breen, Daniel P.; Robbie, Malcolm G.

    2002-01-01

    The contents include: 1) Rope Seal; 2) Improvements to porous medial simulation in CFD-ACE+; 3) Porous media heat transfer validation case-stead-state and transient flat plate; 4) Simulation of GRC cold flow seal test fixture; 5) Simulation of calibration plate in the Panel Test Facility (PTF); and 6) Simulation of rope seal test in the PTF. This paper is in viewgraph form.

  12. Contamination Control and Evaluation for Manufacturing, Ground Tests, Flight Operation and Post-Retrieval Analyses of the TANPOPO Exposed Panels and Capture Panels

    NASA Astrophysics Data System (ADS)

    Yano, Hajime; Hashimoto, Hirofumi; Kawaguchi, Yuko; Yokobori, Shin-ichi; Uchihori, Yukio; Tabata, Makoto; Yamagishi, Akihiko; Sasaki, Satoshi; Imai, Eiichi

    The TANPOPO (“dandelion” in Japanese) is Japan’s first astrobiology space experiment to be exposed on and retrieved from the ISS-Kibo Exposed Facility from the 2014-5 timeframe. During its 1-3 years of continuous exposure operation in the low earth orbit (LEO) of the Earth, it aims to test key questions consisted of the “quasi-panspermia” hypothesis, a theory for exogenesis origin of life and their precursor transports among celestial bodies The TANPOPO experiment consists of following six sub-themes (ST): 1) the first intact capture of terrestrial microbial colonies in LEO, 2) survival test of terrestrial microbes long exposed in LEO, 3) alteration tests of artificially composed “astronomical organic analogs” long exposed in LEO, 4) intact capture of organic-bearing micrometeoroids with the lowest peak temperature ever in LEO, 5) space flight verification of the world’s lowest density aerogels for intact capture of microparticles, and 6) meteoroid and orbital debris flux assessment only capable to be measured in-situ in LEO. Each will utilize one or more Capture Panel(CP) and Exposure Panel (EP) samples from various pointing faces onboard the Kibo Exposed Facility, i.e., anti-Earth pointing face(Space), leading face (East) and anti-Pressurized Facility face (North), as the ISS is an Earth gravity gradient three-axis stabilized satellite. In order to both satisfy scientific values and planetary protection policy, contamination control and evaluation protocols are implemented for the whole process of manufacturing, ground tests, flight operation and post-retrieval initial analyses of both CPs and EPs. The CPs employ blocks of 0.01g/ccultra-low dense aerogels on its to intact capture impacting solid microparticles such as organic-bearing micrometeoroids, artificial orbital debris and possible terrestrial aerosols temporally reached to the LEO, for assessing the possibility of interplanetary transport of life and its precursors. By analyzing them

  13. Cause and pre-alarm control of bulking and foaming by Microthrix parvicella--a case study in triple oxidation ditch at a wastewater treatment plant.

    PubMed

    Xie, B; Dai, X-C; Xu, Y-T

    2007-05-01

    The cause and control of foaming and bulking in triple oxidation ditch at a wastewater treatment plant (WWTP) were investigated. The results showed that the foaming and bulking was mainly caused by the excessive propagation of Microthrix parvicella, and mostly occurred in the cold winter and spring. Batch and continuous flow experiments indicated that biological techniques such as reducing sludge retention time (SRT) and increasing F/M ratio, chemical methods such as addition of chlorine (NaOCl), quaternary ammonium salt (QAS), or cationic polyacrylamide flocculants (PAM), polyaluminum salt (PAC) could decrease Sludge Volume Index (SVI) and control foaming and bulking at different levels. In practical application, the shorter SRT was effective to control foaming and bulking in initial stage, although it took longer time. Addition of 10gClkgMLSSd(-1) could gradually change the activated sludge with serious foaming and bulking to normal state within a week. Pre-alert control strategies should be established for the control of filamentous foaming and bulking. PMID:17049735

  14. 33 CFR 127.1207 - Warning alarms.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Hazardous Gas Equipment § 127.1207 Warning alarms. (a) Each...

  15. Advanced alarm systems: Display and processing issues

    SciTech Connect

    O`Hara, J.M.; Wachtel, J.; Perensky, J.

    1995-05-01

    This paper describes a research program sponsored by the US Nuclear Regulatory Commission to address the human factors engineering (HFE) deficiencies associated with nuclear power plant alarm systems. The overall objective of the study is to develop HFE review guidance for alarm systems. In support of this objective, human performance issues needing additional research were identified. Among the important issues were alarm processing strategies and alarm display techniques. This paper will discuss these issues and briefly describe our current research plan to address them.

  16. 28. SONAR CONTROL ROOM FORWARD LOOKING AFT SHOWING AN/SQS23G ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. SONAR CONTROL ROOM - FORWARD LOOKING AFT SHOWING AN/SQS-23G DETECTING-RANGING SET, MARK & CONTROL PANEL, CAN-55134 RECORDER, SPEED INDICATOR, VARIOUS ALARMS AND INTERNAL COMMUNICATION CIRCUITS. - U.S.S. HORNET, Puget Sound Naval Shipyard, Sinclair Inlet, Bremerton, Kitsap County, WA

  17. Supersonic flutter suppression of electrorheological fluid-based adaptive panels resting on elastic foundations using sliding mode control

    NASA Astrophysics Data System (ADS)

    Hasheminejad, Seyyed M.; Nezami, M.; Aryaee Panah, M. E.

    2012-04-01

    Brief reviews on suppressing panel flutter vibrations by various active control strategies as well as utilization tunable electrorheological fluids (ERFs) for vibration control of structural systems are presented. Active suppression of the supersonic flutter motion of a simply supported sandwich panel with a tunable ERF interlayer, and coupled to an elastic foundation, is subsequently investigated. The structural formulation is based on the classical beam theory along with the Winkler-Pasternak foundation model, the ER fluid core is modeled as a first-order Kelvin-Voigt material, and the quasi-steady first-order supersonic piston theory is employed to describe the aerodynamic loading. Hamilton’s principle is used to derive a set of fully coupled dynamic equations of motion. The generalized Fourier expansions in conjunction with the Galerkin method are then employed to formulate the governing equations in the state space domain. The critical dynamic pressures at which unstable panel oscillations (coalescence of eigenvalues) occur are obtained via the p-method for selected applied electric field strengths (E = 0,2,4 kV mm-1). The classical Runge-Kutta time integration algorithm is subsequently used to calculate the open-loop aeroelastic response of the system in various basic loading configurations (i.e. uniformly distributed blast, gust, sonic boom, and step loads), with or without an interacting soft/stiff elastic foundation. Finally, a sliding mode control synthesis (SMC) involving the first six natural modes of the structural system is set up to actively suppress the closed-loop system response in supersonic flight conditions and under the imposed excitations. Simulation results demonstrate performance, effectiveness, and insensitivity with respect to the spillover of the proposed SMC-based control system. Limiting cases are considered and good agreements with the data available in the literature as well as with the computations made by using the Rayleigh

  18. MRDIS Standalone Central Alarm Station

    2012-09-12

    The MRDIS Standalone Central Alarm Station(MRDIS-CAS} is a software system for receiving, storing, and reviewing radiation data collected by the Mobile Radiation Detection and Identification System (MRDIS}, a mobile radiation scanning system developed for use in foreign ports for the DOE Megaports Initiative. It is designed to run on one of the on board computers in the MRDIS cab. It will collect, store, and display data from the MRDIS without the need for wireless communicationsmore » or centralized server technology. It is intended to be a lightweight replacement for a distributed Megaports communication system in ports where the necessary communications infrastructure does not exist for a full Megaports communications system.« less

  19. False alarm reduction in critical care.

    PubMed

    Clifford, Gari D; Silva, Ikaro; Moody, Benjamin; Li, Qiao; Kella, Danesh; Chahin, Abdullah; Kooistra, Tristan; Perry, Diane; Mark, Roger G

    2016-08-01

    High false alarm rates in the ICU decrease quality of care by slowing staff response times while increasing patient delirium through noise pollution. The 2015 PhysioNet/Computing in Cardiology Challenge provides a set of 1250 multi-parameter ICU data segments associated with critical arrhythmia alarms, and challenges the general research community to address the issue of false alarm suppression using all available signals. Each data segment was 5 minutes long (for real time analysis), ending at the time of the alarm. For retrospective analysis, we provided a further 30 seconds of data after the alarm was triggered. A total of 750 data segments were made available for training and 500 were held back for testing. Each alarm was reviewed by expert annotators, at least two of whom agreed that the alarm was either true or false. Challenge participants were invited to submit a complete, working algorithm to distinguish true from false alarms, and received a score based on their program's performance on the hidden test set. This score was based on the percentage of alarms correct, but with a penalty that weights the suppression of true alarms five times more heavily than acceptance of false alarms. We provided three example entries based on well-known, open source signal processing algorithms, to serve as a basis for comparison and as a starting point for participants to develop their own code. A total of 38 teams submitted a total of 215 entries in this year's Challenge. This editorial reviews the background issues for this challenge, the design of the challenge itself, the key achievements, and the follow-up research generated as a result of the Challenge, published in the concurrent special issue of Physiological Measurement. Additionally we make some recommendations for future changes in the field of patient monitoring as a result of the Challenge. PMID:27454172

  20. Development of medical equipment alarm monitoring system.

    PubMed

    Yamashita, Yoshinori; Ogaito, Tatoku; Kasamatsu, Shingo

    2013-01-01

    In a hospital, we use a large number of medical equipment. In these use, I support the safe use by the alarm such as errors from medical equipment. There is the instrument notifying of alarm in communication, but there is the instrument by a sound and the light. For the medical safety management, confirmation of the alarm is important. We thought that stability was improved by integrating alarm from the instrument of the different type. Therefore, we thought that we integrated alarm from medical equipment. We decided to transmit an alarm signal from medical equipment by adding radio module program unit. The type of the radio used IEEE 802.15.4 (ZigBee) at a point of view of low power, International Standard, simple radio equipment. This system deals with only alarm information from medical equipment and does not handle the data. However, we understood that we were helpful very much even if it was only alarm information. We were able to in this way reduce the number of incidents. PMID:23920969

  1. 21 CFR 876.2040 - Enuresis alarm.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Enuresis alarm. 876.2040 Section 876.2040 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES... alarm is a device intended for use in treatment of bedwetting. Through an electrical trigger...

  2. Display-And-Alarm Circuit For Accelerometer

    NASA Technical Reports Server (NTRS)

    Bozeman, Richard J., Jr.

    1995-01-01

    Compact accelerometer assembly consists of commercial accelerometer retrofit with display-and-alarm circuit. Provides simple means for technician attending machine to monitor vibrations. Also simpifies automatic safety shutdown by providing local alarm or shutdown signal when vibration exceeds preset level.

  3. 21 CFR 876.2040 - Enuresis alarm.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Enuresis alarm. 876.2040 Section 876.2040 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES GASTROENTEROLOGY-UROLOGY DEVICES Monitoring Devices § 876.2040 Enuresis alarm. (a) Identification. An...

  4. 46 CFR 95.15-30 - Alarms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Alarms. 95.15-30 Section 95.15-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS FIRE PROTECTION EQUIPMENT Carbon Dioxide Extinguishing Systems, Details § 95.15-30 Alarms. (a) Spaces which are protected by a carbon dioxide extinguishing system and...

  5. 46 CFR 193.15-30 - Alarms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Alarms. 193.15-30 Section 193.15-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS FIRE PROTECTION EQUIPMENT Carbon Dioxide and Clean Agent Extinguishing Systems, Details § 193.15-30 Alarms. (a) Space normally accessible to persons on board while...

  6. 46 CFR 95.15-30 - Alarms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Dioxide Extinguishing Systems, Details § 95.15-30 Alarms. (a) Spaces which are protected by a carbon... audible alarm in such spaces which will be automatically sounded when the carbon dioxide is admitted to... sound during the 20 second delay period prior to the discharge of carbon dioxide into the space, and...

  7. 46 CFR 193.15-30 - Alarms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Alarms. 193.15-30 Section 193.15-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS FIRE PROTECTION EQUIPMENT Carbon Dioxide and Clean Agent Extinguishing Systems, Details § 193.15-30 Alarms. (a) Space normally accessible to persons on board while...

  8. The chemistry of eavesdropping, alarm, and deceit.

    PubMed Central

    Stowe, M K; Turlings, T C; Loughrin, J H; Lewis, W J; Tumlinson, J H

    1995-01-01

    Arthropods that prey on or parasitize other arthropods frequently employ those chemical cues that reliably indicate the presence of their prey or hosts. Eavesdropping on the sex pheromone signals emitted to attract mates allows many predators and parasitoids to find and attack adult insects. The sex pheromones are also useful signals for egg parasitoids since eggs are frequently deposited on nearby plants soon after mating. When the larval stages of insects or other arthropods are the targets, a different foraging strategy is employed. The larvae are often chemically inconspicuous, but when they feed on plants the injured plants respond by producing and releasing defensive chemicals. These plant chemicals may also serve as "alarm signals" that are exploited by predators and parasitoids to locate their victims. There is considerable evidence that the volatile "alarm signals" are induced by interactions of substances from the herbivore with the damaged plant tissue. A very different strategy is employed by several groups of spiders that remain stationary and send out chemical signals that attract prey. Some of these spiders prey exclusively on male moths. They attract the males by emitting chemicals identical to the sex pheromones emitted by female moths. These few examples indicate the diversity of foraging strategies of arthropod predators and parasitoids. It is likely that many other interesting chemically mediated interactions between arthropod hunters and their victims remain to be discovered. Increased understanding of these systems will enable us to capitalize on natural interactions to develop more ecologically sound, environmentally safe methods for biological control of insect pests of agriculture. PMID:7816823

  9. Criticality alarm system for plutonium process operations

    SciTech Connect

    Tyree, W H; Urano, H

    1981-05-25

    A criticality alarm system using neutron detection is described. The system includes a neutron detection unit with an internal operational testing mode. The unit uses a Li/sup 6/F foil for the production of alpha particles from a thermal neturon flux, a thorium-230 alpha particle source for the continuous monitoring of the raidation detection circuits, and an internal clock which produces an alarmed condition if the detector amplifier circuit fails. This neutron detector unit is designed to replace the existing neutron detector in the criticality alarm systems at Rocky Flats. Coincidence circuits, interface system and audio signal generators used in the output of the alarm system are described. The system meets the criteria for the American National Standards and the USDOE Manual Chapter for detection, alarm, and signal output requirements.

  10. Advanced nuclear plant control complex

    DOEpatents

    Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.

    1993-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

  11. 46 CFR 154.1365 - Audible and visual alarms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Audible and visual alarms. 154.1365 Section 154.1365... Instrumentation § 154.1365 Audible and visual alarms. (a) Each audible alarm must have an arrangement that allows... alarm's actuation by other faults. (b) Each visual alarm must be one that can be turned off only...

  12. 46 CFR 113.43-3 - Alarm system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Alarm system. 113.43-3 Section 113.43-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT Steering Failure Alarm Systems § 113.43-3 Alarm system. (a) Each vessel must have a steering failure alarm system that actuates...

  13. Estimation of the patient monitor alarm rate for a quantitative analysis of new alarm settings.

    PubMed

    de Waele, Stijn; Nielsen, Larry; Frassica, Joseph

    2014-01-01

    In many critical care units, default patient monitor alarm settings are not fine-tuned to the vital signs of the patient population. As a consequence there are many alarms. A large fraction of the alarms are not clinically actionable, thus contributing to alarm fatigue. Recent attention to this phenomenon has resulted in attempts in many institutions to decrease the overall alarm load of clinicians by altering the trigger thresholds for monitored parameters. Typically, new alarm settings are defined based on clinical knowledge and patient population norms and tried empirically on new patients without quantitative knowledge about the potential impact of these new settings. We introduce alarm regeneration as a method to estimate the alarm rate of new alarm settings using recorded patient monitor data. This method enables evaluation of several alarm setting scenarios prior to using these settings in the clinical setting. An expression for the alarm rate variance is derived for the calculation of statistical confidence intervals on the results. PMID:25571296

  14. Alarming features: birds use specific acoustic properties to identify heterospecific alarm calls

    PubMed Central

    Fallow, Pamela M.; Pitcher, Benjamin J.; Magrath, Robert D.

    2013-01-01

    Vertebrates that eavesdrop on heterospecific alarm calls must distinguish alarms from sounds that can safely be ignored, but the mechanisms for identifying heterospecific alarm calls are poorly understood. While vertebrates learn to identify heterospecific alarms through experience, some can also respond to unfamiliar alarm calls that are acoustically similar to conspecific alarm calls. We used synthetic calls to test the role of specific acoustic properties in alarm call identification by superb fairy-wrens, Malurus cyaneus. Individuals fled more often in response to synthetic calls with peak frequencies closer to those of conspecific calls, even if other acoustic features were dissimilar to that of fairy-wren calls. Further, they then spent more time in cover following calls that had both peak frequencies and frequency modulation rates closer to natural fairy-wren means. Thus, fairy-wrens use similarity in specific acoustic properties to identify alarms and adjust a two-stage antipredator response. Our study reveals how birds respond to heterospecific alarm calls without experience, and, together with previous work using playback of natural calls, shows that both acoustic similarity and learning are important for interspecific eavesdropping. More generally, this study reconciles contrasting views on the importance of alarm signal structure and learning in recognition of heterospecific alarms. PMID:23303539

  15. An improved criticality alarm system

    SciTech Connect

    Tyree, W.H.; Gilpin, H.E.; Balmer, D.K.; Vennitti, D.A.

    1991-12-31

    The Rocky Flats Plant near Golden, Colorado is the primary facility for the production of plutonium components used in the US arsenal of nuclear weapons. It is operated by EG&G under contract to the US Department of Energy (DOE). There are ten production buildings on plant site with neutron based criticality alarm systems. These systems have been in operation for the past seventeen years. Changes in the interpretation of A.N.S.I. standards and DOE orders have precipitated an evaluation of detector sensitivity and placement criteria. As a result of this evaluation, improvements in detector design and calibration have improved detector sensitivity by a factor of six. Testing performed on the design defined a minimum sensitivity as required by A.N.S.I. 8.3 and provided information for saturation and survivability for a fission event of up to 1 {times} 10{sup 17} fissions in 80 microseconds. A rigorous testing and calibration program has been developed and is in place. Neutron sensitivity is certified at a nearby reactor which is traceable to N.I.S.T.. 4 refs.

  16. Comprehensive smoke alarm coverage in lower economic status homes: alarm presence, functionality, and placement.

    PubMed

    Sidman, Elanor A; Grossman, David C; Mueller, Beth A

    2011-08-01

    The objectives of this study are to estimate smoke alarm coverage and adherence with national guidelines in low- to mid-value owner-occupied residences, and to identify resident demographic, behavioral, and building characteristics and other fire and burn safety practices associated with smoke alarm utilization. Baseline visits were conducted with 779 households in King County, Washington, for a randomized trial of smoke alarm functionality. Presence, functionality, features, and location of pre-existing smoke alarms were ascertained by staff observation and testing. Household and building descriptors were collected using questionnaires. Households were classified by presence of smoke alarms, functional alarms, and functional and properly mounted alarms placed in hallways and on each floor but not in recommended avoidance locations. Smoke alarms were present in 89%, and functional units in 78%, of households. Only 6-38% met all assessed functionality and placement recommendations. Homes frequently lacked alarms in any bedrooms or on each floor. Building age, but not renovation status, was associated with all dimensions of smoke alarm coverage; post-1980 constructions were 1.7 times more likely to comply with placement recommendations than were pre-1941 homes (95% CI: 1.1-2.6). Respondent education and race/ethnicity, children <5 years, residency duration, number of floors, wood stoves and fireplaces, number of smoke alarms, recency of smoke alarm testing, carbon monoxide monitors, and fire ladders displayed varying relationships with alarm presence, functionality, and placement. Strategies for maintaining smoke alarms in functional condition and improving compliance with placement recommendations are necessary to achieve universal coverage, and will benefit the majority of households. PMID:21107891

  17. Alarm points for fixed oxygen monitors

    SciTech Connect

    Miller, G.C.

    1987-05-01

    Oxygen concentration monitors were installed in a vault where numerous pipes carried inert cryogens and gases to the Mirror Fusion Test Facility (MFTF-B) experimental vessel at Lawrence Livermore National Laboratory (LLNL). The problems associated with oxygen-monitoring systems and the reasons why such monitors were installed were reviewed. As a result of this review, the MFTF-B monitors were set to sound an evacuation alarm when the oxygen concentration fell below 18%. We chose the 18% alarm criterion to minimize false alarms and to allow time for personnel to escape in an oxygen-deficient environment.

  18. Feedback control of wave propagation in a rectangular panel, part 2: Experimental realization using clustered velocity and displacement feedback

    NASA Astrophysics Data System (ADS)

    Iwamoto, Hiroyuki; Tanaka, Nobuo; Hill, Simon G.

    2012-10-01

    This study presents the feedback control of flexural waves propagating in a rectangular panel. The objective of this paper (part 2) is to experimentally implement the feedback wave control method which was proposed in part 1 of the two series papers. Firstly, based on the collocation of sensors and actuators, clustered velocity and displacement feedback (C-VDFB) is newly proposed. Next, linking C-VDFB with the active wave control proposed in part 1, it is clarified that the active wave control system can be realized to a limited extent. Then, from a viewpoint of numerical simulations, the characteristics of the feedback gains of C-VDFB and its control performance are clarified. It is shown that C-VDFB enables the inactivation of vibration modes at the target frequencies. Furthermore, it is clarified that even at the non-target frequencies, the proposed method sufficiently reduces the structural vibration. Finally, experiments on the reflected wave absorbing control using clustered direct velocity and displacement feedback are carried out. The experimental results show good agreement with those obtained in the simulation.

  19. Panel flutter

    NASA Technical Reports Server (NTRS)

    Dowell, E. H.

    1972-01-01

    Criteria are presented for the prediction of panel flutter, determination of its occurrence, design for its prevention, and evaluation of its severity. Theoretical analyses recommended for the prediction of flutter stability boundaries, vibration amplitudes, and frequencies for several types of panels are described. Vibration tests and wind tunnel tests are recommended for certain panels and environmental flow conditions to provide information for design of verification analysis. Appropriate design margins on flutter stability boundaries are given and general criteria are presented for evaluating the severity of possible short-duration, limited-amplitude panel flutter on nonreusable vehicles.

  20. Interaction Metrics for Feedback Control of Sound Radiation from Stiffened Panels

    NASA Technical Reports Server (NTRS)

    Cabell, Randolph H.; Cox, David E.; Gibbs, Gary P.

    2003-01-01

    Interaction metrics developed for the process control industry are used to evaluate decentralized control of sound radiation from bays on an aircraft fuselage. The metrics are applied to experimentally measured frequency response data from a model of an aircraft fuselage. The purpose is to understand how coupling between multiple bays of the fuselage can destabilize or limit the performance of a decentralized active noise control system. The metrics quantitatively verify observations from a previous experiment, in which decentralized controllers performed worse than centralized controllers. The metrics do not appear to be useful for explaining control spillover which was observed in a previous experiment.

  1. Heat pipe thermal conditioning panel

    NASA Technical Reports Server (NTRS)

    Saaski, E. W.; Loose, J. D.; Mccoy, K. E.

    1974-01-01

    Thermal control of electronic hardware and experiments on future space vehicles is critical to proper functioning and long life. Thermal conditioning panels (cold plates) are a baseline control technique in current conceptual studies. Heat generating components mounted on the panels are typically cooled by fluid flowing through integral channels within the panel. However, replacing the pumped fluid coolant loop within the panel with heat pipes offers attractive advantages in weight, reliability, and installation. This report describes the development and fabrication of two large 0.76 x 0.76 m heat pipe thermal conditioning panels to verify performance and establish the design concept.

  2. 78 FR 732 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ..., Surveillance, and Control of Vector-Borne and Zoonotic Infectious Diseases in Uganda, Funding Opportunity... Control of Vector- Borne and Zoonotic Infectious Diseases in Uganda, FOA CK13-001.'' Contact Person...

  3. NASA Office of Aeronautics and Space Technology Summer Workshop. Volume 8: Thermal control panel

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Technology deficiencies in the area of thermal control for future space missions are identified with emphasis on large space structures and cold controlled environments. Thermal control surfaces, heat pipes, and contamination are considered along with cryogenics, insulation, and design techniques. Major directions forecast for thermal control technology development and space experiments are: (1) extend the useful lifetime of cryogenic systems for space, (2) reduce temperature gradients, and (3) improve temperature stability.

  4. Alarm Systems: Library Confounds Criminal Capers.

    ERIC Educational Resources Information Center

    Gjettum, Pamela

    1978-01-01

    Tells the story of a small town library faced with the problem of preventing nuisance burglaries of the type becoming more and more common. The problems of selecting the right type of alarm system are discussed. (JPF)

  5. 46 CFR 95.15-30 - Alarms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... conspicuously and centrally located and be marked as required by 46 CFR 97.37-9; and (3) Use stored gas power... approved audible alarm if: (1) The space is normally accessible to persons onboard while the vessel...

  6. 78 FR 20319 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-04

    ... Malaria Control and Elimination Activities, FOA GH13-005; and Research and Technical Assistance for Public... Surveillance for Japanese Encephalitis in India, FOA GH13-004; Monitoring and Evaluation of Malaria Control and... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention...

  7. 76 FR 13619 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Funding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-14

    ... Centers for Disease Control and Prevention on Malaria and Vector-Borne Diseases Funding Opportunity Announcement (FOA) GH11-003, and Research Activities in Support of Malaria Prevention and Control in the... Centers for Disease Control and Prevention on Malaria and Vector-Borne Diseases, FOA GH11-003,...

  8. 78 FR 17411 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-21

    ... Evaluation of Malaria Control and Elimination Activities, FOA GH13-005, initial review. In accordance with... in response to ``Monitoring and Evaluation of Malaria Control and Elimination Activities, FOA GH13... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention...

  9. 78 FR 56236 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-12

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and... Committee Act (Pub. L. 92-463), the Centers for Disease Control and Prevention (CDC) announces the... Disease Control and Prevention and the Agency for Toxic Substances and Disease Registry. Elaine L....

  10. 76 FR 56461 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and... Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), the Centers for Disease Control... management activities, for both the Centers for Disease Control and Prevention and the Agency for...

  11. 76 FR 78263 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and... Control and Prevention (CDC) announces the aforementioned meeting: Time and Date: 8 a.m.-5 p.m., January... Disease Control and Prevention and the Agency for Toxic Substances and Disease Registry. Dated: December...

  12. Sensor fusion for intelligent alarm analysis

    SciTech Connect

    Nelson, C.L.; Fitzgerald, D.S.

    1995-03-01

    The purpose of an intelligent alarm analysis system is to provide complete and manageable information to a central alarm station operator by applying alarm processing and fusion techniques to sensor information. This paper discusses the sensor fusion approach taken to perform intelligent alarm analysis for the Advanced Exterior Sensor (AES). The AES is an intrusion detection and assessment system designed for wide-area coverage, quick deployment, low false/nuisance alarm operation, and immediate visual assessment. It combines three sensor technologies (visible, infrared, and millimeter wave radar) collocated on a compact and portable remote sensor module. The remote sensor module rotates at a rate of 1 revolution per second to detect and track motion and provide assessment in a continuous 360` field-of-regard. Sensor fusion techniques are used to correlate and integrate the track data from these three sensors into a single track for operator observation. Additional inputs to the fusion process include environmental data, knowledge of sensor performance under certain weather conditions, sensor priority, and recent operator feedback. A confidence value is assigned to the track as a result of the fusion process. This helps to reduce nuisance alarms and to increase operator confidence in the system while reducing the workload of the operator.

  13. Analyzing safeguards alarms and response decisions

    SciTech Connect

    Al-Ayat, R.A.; Judd, B.R.; McCord, R.K.

    1982-01-01

    This report describes a quantitative model designed to help the Nuclear Regulatory Commission (NRC) and its licensees evaluate and respond to alarms indicating that special nuclear material (SNM) may be missing. The model is called the Alarm/Response (A/R) Model. The report demonstrates three principal uses of the A/R Model. The first is determining the most likely cause of an alarm - theft, hoax, or error. The second is evaluating alternative responses to alarms. Possible responses include conducting investigations, initiating measures to recover stolen SNM, and replying to extortion threats from individuals claiming to possess SNM. For each possible alarm, the model identifies the best response, which can be used to develop contingency plans that the licensee and the NRC can carry out. The third use is to assist the NRC in setting performance standards, especially detection time requirements. In this application, the model helps to determine the value of more timely alarms produced by licensee safeguards systems. All three uses are demonstrated with hypothetical examples. A preliminary computer code produced sample results and determined the sensitivity of those results to subjective factors in the example.

  14. A Rotatable Quality Control Phantom for Evaluating the Performance of Flat Panel Detectors in Imaging Moving Objects.

    PubMed

    Haga, Yoshihiro; Chida, Koichi; Inaba, Yohei; Kaga, Yuji; Meguro, Taiichiro; Zuguchi, Masayuki

    2016-02-01

    As the use of diagnostic X-ray equipment with flat panel detectors (FPDs) has increased, so has the importance of proper management of FPD systems. To ensure quality control (QC) of FPD system, an easy method for evaluating FPD imaging performance for both stationary and moving objects is required. Until now, simple rotatable QC phantoms have not been available for the easy evaluation of the performance (spatial resolution and dynamic range) of FPD in imaging moving objects. We developed a QC phantom for this purpose. It consists of three thicknesses of copper and a rotatable test pattern of piano wires of various diameters. Initial tests confirmed its stable performance. Our moving phantom is very useful for QC of FPD images of moving objects because it enables visual evaluation of image performance (spatial resolution and dynamic range) easily. PMID:26264731

  15. Alarm pheromone does not modulate 22-kHz calls in male rats.

    PubMed

    Muyama, Hiromi; Kiyokawa, Yasushi; Inagaki, Hideaki; Takeuchi, Yukari; Mori, Yuji

    2016-03-15

    Rats are known to emit a series of ultrasonic vocalizations, termed 22-kHz calls, when exposed to distressing stimuli. Pharmacological studies have indicated that anxiety mediates 22-kHz calls in distressed rats. We previously found that exposure to the rat alarm pheromone increases anxiety in rats. Therefore, we hypothesized that the alarm pheromone would increase 22-kHz calls in pheromone-exposed rats. Accordingly, we tested whether exposure to the alarm pheromone induced 22-kHz calls, as well as whether the alarm pheromone increased 22-kHz calls in response to an aversive conditioned stimulus (CS). Rats were first fear-conditioned to an auditory and contextual CS. On the following day, the rats were either exposed to the alarm pheromone or a control odor that was released from the neck region of odor-donor rats. Then, the rats were re-exposed to the aversive CS. The alarm pheromone neither induced 22-kHz calls nor increased 22-kHz calls in response to the aversive CS. In contrast, the control odor unexpectedly reduced the total number and duration of 22-kHz calls elicited by the aversive CS, as well as the duration of freezing. These results suggest that the alarm pheromone does not affect 22-kHz calls in rats. However, we may have found evidence for an appeasing olfactory signal, released from the neck region of odor-donor rats. PMID:26796788

  16. African Elephant Alarm Calls Distinguish between Threats from Humans and Bees

    PubMed Central

    Douglas-Hamilton, Iain; Vollrath, Fritz; Savage, Anne

    2014-01-01

    The Samburu pastoralists of Northern Kenya co-exist with African elephants, Loxodonta africana, and compete over resources such as watering holes. Audio playback experiments demonstrate that African elephants produce alarm calls in response to the voices of Samburu tribesmen. When exposed to adult male Samburu voices, listening elephants exhibited vigilance behavior, flight behavior, and produced vocalizations (rumbles, roars and trumpets). Rumble vocalizations were most common and were characterized by increased and more variable fundamental frequencies, and an upward shift in the first [F1] and second [F2] formant locations, compared to control rumbles. When exposed to a sequence of these recorded rumbles, roars and trumpets, listening elephants also exhibited vigilance and flight behavior. The same behavior was observed, in lesser degrees, both when the roars and trumpets were removed, and when the second formants were artificially lowered to levels typical of control rumbles. The “Samburu alarm rumble” is acoustically distinct from the previously described “bee alarm rumble.” The bee alarm rumbles exhibited increased F2, while Samburu alarm rumbles exhibited increased F1 and F2, compared to controls. Moreover, the behavioral reactions to the two threats were different. Elephants exhibited vigilance and flight behavior in response to Samburu and bee stimuli and to both alarm calls, but headshaking behavior only occurred in response to bee sounds and bee alarm calls. In general, increasingly threatening stimuli elicited alarm calls with increases in F0 and in formant locations, and increasing numbers of these acoustic cues in vocal stimuli elicited increased vigilance and flight behavior in listening elephants. These results show that African elephant alarm calls differentiate between two types of threat and reflect the level of urgency of threats. PMID:24586753

  17. African elephant alarm calls distinguish between threats from humans and bees.

    PubMed

    Soltis, Joseph; King, Lucy E; Douglas-Hamilton, Iain; Vollrath, Fritz; Savage, Anne

    2014-01-01

    The Samburu pastoralists of Northern Kenya co-exist with African elephants, Loxodonta africana, and compete over resources such as watering holes. Audio playback experiments demonstrate that African elephants produce alarm calls in response to the voices of Samburu tribesmen. When exposed to adult male Samburu voices, listening elephants exhibited vigilance behavior, flight behavior, and produced vocalizations (rumbles, roars and trumpets). Rumble vocalizations were most common and were characterized by increased and more variable fundamental frequencies, and an upward shift in the first [F1] and second [F2] formant locations, compared to control rumbles. When exposed to a sequence of these recorded rumbles, roars and trumpets, listening elephants also exhibited vigilance and flight behavior. The same behavior was observed, in lesser degrees, both when the roars and trumpets were removed, and when the second formants were artificially lowered to levels typical of control rumbles. The "Samburu alarm rumble" is acoustically distinct from the previously described "bee alarm rumble." The bee alarm rumbles exhibited increased F2, while Samburu alarm rumbles exhibited increased F1 and F2, compared to controls. Moreover, the behavioral reactions to the two threats were different. Elephants exhibited vigilance and flight behavior in response to Samburu and bee stimuli and to both alarm calls, but headshaking behavior only occurred in response to bee sounds and bee alarm calls. In general, increasingly threatening stimuli elicited alarm calls with increases in F0 and in formant locations, and increasing numbers of these acoustic cues in vocal stimuli elicited increased vigilance and flight behavior in listening elephants. These results show that African elephant alarm calls differentiate between two types of threat and reflect the level of urgency of threats. PMID:24586753

  18. The acute physiological stress response to an emergency alarm and mobilization during the day and at night

    PubMed Central

    Hall, Sarah J; Aisbett, Brad; Tait, Jamie L; Turner, Anne I; Ferguson, Sally A; Main, Luana C

    2016-01-01

    The purpose of this study was to investigate the acute physiological stress response to an emergency alarm and mobilization during the day and at night. Sixteen healthy males aged 25 ± 4 years (mean ± SD) spent four consecutive days and nights in a sleep laboratory. This research used a within-participants design with repeated measures for time, alarm condition (alarm or control), and trial (day or night). When an alarm sounded, participants were required to mobilize immediately. Saliva samples for cortisol analysis were collected 0 min, 15 min, 30 min, 45 min, 60 min, 90 min, and 120 min after mobilization, and at corresponding times in control conditions. Heart rate was measured continuously throughout the study. Heart rate was higher in the day (F20,442 = 9.140, P < 0.001) and night (F23,459 = 8.356, P < 0.001) alarm conditions compared to the respective control conditions. There was no difference in saliva cortisol between day alarm and day control conditions. Cortisol was higher (F6,183 = 2.450, P < 0.001) following the night alarm and mobilization compared to the night control condition. The magnitude of difference in cortisol between night control and night alarm conditions was greater (F6,174 = 4.071, P < 0.001) than the magnitude of difference between the day control and day alarm conditions. The augmented heart rate response to the day and night alarms supports previous observations in field settings. Variations in the cortisol responses between conditions across the day and night may relate to differences in participants’ ability to interpret the alarm when sleeping versus when awake. PMID:27157688

  19. The acute physiological stress response to an emergency alarm and mobilization during the day and at night.

    PubMed

    Hall, Sarah J; Aisbett, Brad; Tait, Jamie L; Turner, Anne I; Ferguson, Sally A; Main, Luana C

    2016-01-01

    The purpose of this study was to investigate the acute physiological stress response to an emergency alarm and mobilization during the day and at night. Sixteen healthy males aged 25 ± 4 years (mean ± SD) spent four consecutive days and nights in a sleep laboratory. This research used a within-participants design with repeated measures for time, alarm condition (alarm or control), and trial (day or night). When an alarm sounded, participants were required to mobilize immediately. Saliva samples for cortisol analysis were collected 0 min, 15 min, 30 min, 45 min, 60 min, 90 min, and 120 min after mobilization, and at corresponding times in control conditions. Heart rate was measured continuously throughout the study. Heart rate was higher in the day (F(20,442) = 9.140, P < 0.001) and night (F(23,459) = 8.356, P < 0.001) alarm conditions compared to the respective control conditions. There was no difference in saliva cortisol between day alarm and day control conditions. Cortisol was higher (F(6,183) = 2.450, P < 0.001) following the night alarm and mobilization compared to the night control condition. The magnitude of difference in cortisol between night control and night alarm conditions was greater (F(6,174) = 4.071, P < 0.001) than the magnitude of difference between the day control and day alarm conditions. The augmented heart rate response to the day and night alarms supports previous observations in field settings. Variations in the cortisol responses between conditions across the day and night may relate to differences in participants' ability to interpret the alarm when sleeping versus when awake. PMID:27157688

  20. Expert Panel Consensus for and Analysis of Key Attributes on Websites Devoted to Weight Control

    ERIC Educational Resources Information Center

    Brown, Stephen L.; Land, Diane; Johnson, Chandrika; Miller, Kim

    2014-01-01

    Background: Obesity presents major challenges to public health in the United States. Trials of web-based interventions for weight control suggest that the Internet is a promising option for program delivery. Purpose: This study sought consensus among experts regarding critical components of successful weight control and to systematically examine…

  1. 76 FR 67458 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and..., for both the Centers for Disease Control and Prevention and the Agency for Toxic Substances and Disease Registry. ] Dated: October 25, 2011. Elaine L. Baker, Director, Management Analysis and...

  2. 78 FR 19489 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and...-067; and Feasibility Study of the New Clinical Measure of Colorectal Cancer Screening for Federally... the Federal Advisory Committee Act (Pub. L. 92-463), the Centers for Disease Control and...

  3. 76 FR 9785 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Human...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... Programs, National Center for HIV, Hepatitis and Sexually Transmitted Diseases Prevention, CDC, 1600... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and... Committee Act (Pub. L. 92-463), the Centers for Disease Control and Prevention (CDC) announces...

  4. 76 FR 45575 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ..., Extramural Programs, National Center for HIV, Hepatitis and Sexually Transmitted Diseases Prevention, CDC... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and... management activities, for both the Centers for Disease Control and Prevention and the Agency for...

  5. 75 FR 6675 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Human...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ..., National Center for HIV, Hepatitis and Sexually Transmitted Diseases Prevention, 1600 Clifton Road, NE... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and... Advisory Committee Act (Pub. L. 92-463), the Centers for Disease Control and Prevention (CDC),...

  6. Advanced nuclear plant control room complex

    DOEpatents

    Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.

    1993-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

  7. Console for a nuclear control complex

    DOEpatents

    Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.

    1993-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

  8. Use of urine alarms in toilet training children with intellectual and developmental disabilities: A review.

    PubMed

    Levato, Lynne E; Aponte, Courtney A; Wilkins, Jonathan; Travis, Rebekah; Aiello, Rachel; Zanibbi, Katherine; Loring, Whitney A; Butter, Eric; Smith, Tristram; Mruzek, Daniel W

    2016-01-01

    The purpose of this review is to describe and evaluate the existing research on the use of urine alarms in the daytime toilet training of children with intellectual and developmental disabilities (IDD). A systematic literature search yielded 12 studies, many of which were published over a decade ago. The findings suggest that interventions that incorporate the use of urine alarms are promising in the treatment of daytime enuresis for children with IDD; however, more carefully controlled research is needed to confirm these findings and elucidate the precise role urine alarms may play in toileting interventions. Methodological strengths and limitations of the body of research are discussed. PMID:26942703

  9. 78 FR 17412 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-21

    ... Diseases in Africa, FOA GH13-002, initial review. In accordance with Section 10(a)(2) of the Federal... and Evaluation of Programs for the Elimination and Control of Neglected Tropical Diseases in...

  10. 75 FR 55806 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Patient...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-14

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and... Infections Program (EIP), Enhancing Epidemiology and Laboratory Capacity, Funding Opportunity Announcement... applications received in response to ``Patient Protection and Affordable Care Act (PPACA), Emerging...

  11. 75 FR 39033 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Patient...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-07

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and... Infections Program (EIP), Enhancing Epidemiology and Laboratory Capacity, Funding Opportunity Announcement... in response to ``Patient Protection and Affordable Care Act (PPACA), Emerging Infections Program...

  12. NASA Office of Aeronautics and Space Technology Summer Workshop. Volume 3: Navigation, guidance and control panel

    NASA Technical Reports Server (NTRS)

    1975-01-01

    User technology requirements are identified in relation to needed technology advancement for future space missions in the areas of navigation, guidance, and control. Emphasis is placed on: reduction of mission support cost by 50% through autonomous operation, a ten-fold increase in mission output through improved pointing and control, and a hundred-fold increase in human productivity in space through large-scale teleoperator applications.

  13. Project B610 process control configuration acceptance test procedure

    SciTech Connect

    Silvan, G.R.

    1994-09-20

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; proper operation of all display data on the operator`s console; proper operation of all required alarms; and proper operation of all required interlocks. The MICON A/S control system is configured to replace all the control, indication, and alarm panels now located in the Power Control Room. Nine systems are covered by this control configuration, 2736-ZB HVAC, 234-5Z HVAC, Process Vacuum, Dry Air, 291-Z Closed Loop Cooling, Building Accelerometer, Evacuation Siren, Stack CAMs, and Fire. The 2736-ZB HVAC system consists of the ventilation controls for 2736-ZB and 2736-Z as well as alarms for the emergency generators and 232-Z. The 234-5Z HVAC system is the ventilation controls for 235-5Z and 236-Z buildings. Process Vacuum covers the controls for the 26 inch vacuum system. Dry Air covers the controls for the steam and electric air dryers. The 291-Z Closed Loop Cooling system consists of the status indications and alarms for the 291-Z compressor and vacuum pump closed loop cooling system. The rest of closed loop cooling was tested earlier. The Building Accelerometer system consists of the status indications for the two seismic system accelerometers. The Evacuation Siren system includes the controls for the evacuation and take cover sirens. Stack CAMs cover the alarms for the various building ventilation stack continuous air monitors. Finally, the Fire system covers the various fire alarms now located in Room 321-A.

  14. Optimal locations of piezoelectric patches for supersonic flutter control of honeycomb sandwich panels, using the NSGA-II method

    NASA Astrophysics Data System (ADS)

    Nezami, M.; Gholami, B.

    2016-03-01

    The active flutter control of supersonic sandwich panels with regular honeycomb interlayers under impact load excitation is studied using piezoelectric patches. A non-dominated sorting-based multi-objective evolutionary algorithm, called non-dominated sorting genetic algorithm II (NSGA-II) is suggested to find the optimal locations for different numbers of piezoelectric actuator/sensor pairs. Quasi-steady first order supersonic piston theory is employed to define aerodynamic loading and the p-method is applied to find the flutter bounds. Hamilton’s principle in conjunction with the generalized Fourier expansions and Galerkin method are used to develop the dynamical model of the structural systems in the state-space domain. The classical Runge-Kutta time integration algorithm is then used to calculate the open-loop aeroelastic response of the system. The maximum flutter velocity and minimum voltage applied to actuators are calculated according to the optimal locations of piezoelectric patches obtained using the NSGA-II and then the proportional feedback is used to actively suppress the closed loop system response. Finally the control effects, using the two different controllers, are compared.

  15. 21 CFR 870.2640 - Portable leakage current alarm.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Portable leakage current alarm. 870.2640 Section... leakage current alarm. (a) Identification. A portable leakage current alarm is a device used to measure the electrical leakage current between any two points of an electrical system and to sound an alarm...

  16. 21 CFR 870.2640 - Portable leakage current alarm.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Portable leakage current alarm. 870.2640 Section... leakage current alarm. (a) Identification. A portable leakage current alarm is a device used to measure the electrical leakage current between any two points of an electrical system and to sound an alarm...

  17. 21 CFR 870.2640 - Portable leakage current alarm.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Portable leakage current alarm. 870.2640 Section... leakage current alarm. (a) Identification. A portable leakage current alarm is a device used to measure the electrical leakage current between any two points of an electrical system and to sound an alarm...

  18. 21 CFR 870.2640 - Portable leakage current alarm.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Portable leakage current alarm. 870.2640 Section... leakage current alarm. (a) Identification. A portable leakage current alarm is a device used to measure the electrical leakage current between any two points of an electrical system and to sound an alarm...

  19. 21 CFR 870.2640 - Portable leakage current alarm.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Portable leakage current alarm. 870.2640 Section... leakage current alarm. (a) Identification. A portable leakage current alarm is a device used to measure the electrical leakage current between any two points of an electrical system and to sound an alarm...

  20. 46 CFR 162.050-33 - Bilge alarm: Design specification.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Bilge alarm: Design specification. 162.050-33 Section....050-33 Bilge alarm: Design specification. (a) This section contains requirements that apply to bilge alarms. (b) Each bilge alarm must be designed to meet the requirements for an oil content meter in §...

  1. 46 CFR 113.43-3 - Alarm system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Alarm system. 113.43-3 Section 113.43-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT Steering Failure Alarm Systems § 113.43-3 Alarm system. (a) Each vessel must have...

  2. 46 CFR 113.43-3 - Alarm system.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Alarm system. 113.43-3 Section 113.43-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT Steering Failure Alarm Systems § 113.43-3 Alarm system. (a) Each vessel must have...

  3. 46 CFR 113.20-1 - Sprinkler alarm system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Sprinkler alarm system. 113.20-1 Section 113.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT Automatic Sprinkler Systems § 113.20-1 Sprinkler alarm system. Each sprinkler alarm system, including annunciator,...

  4. 46 CFR 113.43-3 - Alarm system.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Alarm system. 113.43-3 Section 113.43-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT Steering Failure Alarm Systems § 113.43-3 Alarm system. (a) Each vessel must have...

  5. 46 CFR 113.43-3 - Alarm system.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Alarm system. 113.43-3 Section 113.43-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT Steering Failure Alarm Systems § 113.43-3 Alarm system. (a) Each vessel must have...

  6. 46 CFR 154.1365 - Audible and visual alarms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... alarm's actuation by other faults. (b) Each visual alarm must be one that can be turned off only after the fault that actuated it is corrected. (c) Each visual alarm must be marked to show the type and, except for remote group alarms, the location of each fault that actuates it. (d) Each vessel must...

  7. 46 CFR 154.1365 - Audible and visual alarms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... alarm's actuation by other faults. (b) Each visual alarm must be one that can be turned off only after the fault that actuated it is corrected. (c) Each visual alarm must be marked to show the type and, except for remote group alarms, the location of each fault that actuates it. (d) Each vessel must...

  8. 46 CFR 154.1365 - Audible and visual alarms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... alarm's actuation by other faults. (b) Each visual alarm must be one that can be turned off only after the fault that actuated it is corrected. (c) Each visual alarm must be marked to show the type and, except for remote group alarms, the location of each fault that actuates it. (d) Each vessel must...

  9. 46 CFR 154.1365 - Audible and visual alarms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... alarm's actuation by other faults. (b) Each visual alarm must be one that can be turned off only after the fault that actuated it is corrected. (c) Each visual alarm must be marked to show the type and, except for remote group alarms, the location of each fault that actuates it. (d) Each vessel must...

  10. 46 CFR 97.37-9 - Carbon dioxide alarm.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Carbon dioxide alarm. 97.37-9 Section 97.37-9 Shipping... Markings for Fire and Emergency Equipment, Etc. § 97.37-9 Carbon dioxide alarm. (a) All carbon dioxide alarms shall be conspicuously identified: “WHEN ALARM SOUNDS—VACATE AT ONCE. CARBON DIOXIDE...

  11. 46 CFR 97.37-9 - Carbon dioxide alarm.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Carbon dioxide alarm. 97.37-9 Section 97.37-9 Shipping... Markings for Fire and Emergency Equipment, Etc. § 97.37-9 Carbon dioxide alarm. (a) All carbon dioxide alarms shall be conspicuously identified: “WHEN ALARM SOUNDS—VACATE AT ONCE. CARBON DIOXIDE...

  12. 46 CFR 108.627 - Carbon dioxide alarm.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Carbon dioxide alarm. 108.627 Section 108.627 Shipping... EQUIPMENT Equipment Markings and Instructions § 108.627 Carbon dioxide alarm. Each carbon dioxide alarm must be identified by marking: “WHEN ALARM SOUNDS VACATE AT ONCE. CARBON DIOXIDE BEING RELEASED” next...

  13. 46 CFR 108.627 - Carbon dioxide alarm.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Carbon dioxide alarm. 108.627 Section 108.627 Shipping... EQUIPMENT Equipment Markings and Instructions § 108.627 Carbon dioxide alarm. Each carbon dioxide alarm must be identified by marking: “WHEN ALARM SOUNDS VACATE AT ONCE. CARBON DIOXIDE BEING RELEASED” next...

  14. 46 CFR 196.37-9 - Carbon dioxide alarm.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Carbon dioxide alarm. 196.37-9 Section 196.37-9 Shipping... Markings for Fire and Emergency Equipment, etc. § 196.37-9 Carbon dioxide alarm. (a) All carbon dioxide alarms shall be conspicuously identified: “WHEN ALARM SOUNDS—VACATE AT ONCE. CARBON DIOXIDE...

  15. 46 CFR 196.37-9 - Carbon dioxide alarm.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Carbon dioxide alarm. 196.37-9 Section 196.37-9 Shipping... Markings for Fire and Emergency Equipment, etc. § 196.37-9 Carbon dioxide alarm. (a) All carbon dioxide alarms shall be conspicuously identified: “WHEN ALARM SOUNDS—VACATE AT ONCE. CARBON DIOXIDE...

  16. 46 CFR 78.47-9 - Carbon dioxide alarm.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Carbon dioxide alarm. 78.47-9 Section 78.47-9 Shipping... and Emergency Equipment, Etc. § 78.47-9 Carbon dioxide alarm. (a) All carbon dioxide alarms shall be conspicuously identified: “WHEN ALARM SOUNDS—VACATE AT ONCE. CARBON DIOXIDE BEING RELEASED.” (b)...

  17. 46 CFR 78.47-9 - Carbon dioxide alarm.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 3 2011-10-01 2011-10-01 false Carbon dioxide alarm. 78.47-9 Section 78.47-9 Shipping... and Emergency Equipment, Etc. § 78.47-9 Carbon dioxide alarm. (a) All carbon dioxide alarms shall be conspicuously identified: “WHEN ALARM SOUNDS—VACATE AT ONCE. CARBON DIOXIDE BEING RELEASED.” (b)...

  18. 46 CFR 162.050-33 - Bilge alarm: Design specification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Bilge alarm: Design specification. 162.050-33 Section....050-33 Bilge alarm: Design specification. (a) This section contains requirements that apply to bilge alarms. (b) Each bilge alarm must be designed to meet the requirements for an oil content meter in §...

  19. Constant false alarm rate algorithm for the dim-small target detection based on the distribution characteristics of target coordinates

    NASA Astrophysics Data System (ADS)

    Fei, Xiao-Liang; Ren, Kan; Qian, Wei-xian; Wang, Peng-cheng

    2015-10-01

    CFAR (Constant False Alarm Rate) is a key technology in Infrared dim-small target detection system. Because the traditional constant false alarm rate detection algorithm gets the probability density distribution which is based on the pixel information of each area in the whole image and calculates the target segmentation threshold of each area by formula of Constant false alarm rate, the problems including the difficulty of probability distribution statistics and large amount of algorithm calculation and long delay time are existing. In order to solve the above problems effectively, a formula of Constant false alarm rate based on target coordinates distribution is presented. Firstly, this paper proposes a new formula of Constant false alarm rate by improving the traditional formula of Constant false alarm rate based on the single grayscale distribution which objective statistical distribution features are introduced. So the control of false alarm according to the target distribution information is implemented more accurately and the problem of high false alarm that is caused of the complex background in local area as the cloud reflection and the ground clutter interference is solved. At the same time, in order to reduce the amount of algorithm calculation and improve the real-time characteristics of algorithm, this paper divides the constant false-alarm statistical area through two-dimensional probability density distribution of target number adaptively which is different from the general identifying methods of constant false-alarm statistical area. Finally, the target segmentation threshold of next frame is calculated by iteration based on the function of target distribution probability density in image sequence which can achieve the purpose of controlling the false alarm until the false alarm is down to the upper limit. The experiment results show that the proposed method can significantly improve the operation time and meet the real-time requirements on

  20. Low Voltage Alarm Apprenticeship. Related Training Modules. 7.1-26.10 Alarm Basics.

    ERIC Educational Resources Information Center

    Lane Community Coll., Eugene, OR.

    This packet of 70 learning modules on alarm basics is 1 of 8 such packets developed for apprenticeship training for low voltage alarm. Introductory materials are a complete listing of all available modules and a supplementary reference list. Each module contains some or all of these components: goal, performance indicators, study guide (a check…

  1. 76 FR 71568 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and... Behavioral Surveillance For Young Men Who Have Sex With Men, Funding Opportunity Announcement (FOA), PS11... Young Men Who Have Sex With Men, FOA PS11-0010201SUPP12.'' Contact Person for More Information: Amy...

  2. 77 FR 291 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-04

    ... Anderson, M.S., M.P.H., Scientific Review Officer, CDC, 1600 Clifton Road NE., Mailstop E60, Atlanta... and Prevention (CDC) announces the aforementioned meeting: Time and Date: 8 a.m.-5 p.m., February 28... Analysis and Services Office, Centers for Disease Control and Prevention. BILLING CODE 4163-18-P...

  3. 76 FR 9020 - Disease, Disability, and Injury Prevention and Control; Special Emphasis Panel (SEP): Ability of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-16

    ...) Technologies To Reduce the Entomological Risk of Lyme Disease, Funding Opportunity Announcement (FOA) CK11-005... (ITM) Technologies To Reduce the Entomological Risk of Lyme Disease, FOA CK11-005.'' Contact Person for... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention...

  4. 76 FR 32213 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP); Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-03

    ..., Hepatitis and Sexually Transmitted Diseases Prevention, CDC, 1600 Clifton Road, NE., Mailstop E-60, Atlanta... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and... announcements of meetings and other committee management activities, for both the Centers for Disease...

  5. 75 FR 28810 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Addressing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-24

    ...-002. Contact Person for More Information: Hylan D. Shoob, PhD, M.S.P.H., Scientific Review Officer... and Prevention (CDC) announces the aforementioned meeting: Time and Date: 11 a.m.-2 p.m., July 1, 2010..., Management Analysis and Services Office, Centers for Disease Control and Prevention. BILLING CODE 4163-18-P...

  6. 78 FR 19269 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... notice that was published in the Federal Register on March 21, 2013 (78 FR 06434), announcing a... Committee Act (Pub.L. 92- 463). Contact Person for More Information: J. Felix Rogers, Ph.D., M.P.H..., Management Analysis and Services Office, Centers for Disease Control and Prevention. BILLING CODE 4163-18-P...

  7. 76 FR 30366 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ...: Time and Date: 11 a.m.-2 p.m., May 26, 2011 (Closed). ] Contact Person for More Information: Gregory Anderson, M.S., M.P.H., Scientific Review Officer, CDC, 1600 Clifton Road, NE., Mailstop E60, Atlanta... Analysis and Services Office, Centers for Disease Control and Prevention. BILLING CODE 4163-18-P...

  8. 78 FR 75923 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-13

    ... For More Information: Gregory Anderson, M.S., M.P.H., Scientific Review Officer, CDC, 1600 Clifton... Disease Control and Prevention (CDC) announces the aforementioned meeting: Time And Date: 1:00 p.m.-3:00 p... 4163-18-P...

  9. 78 FR 69683 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ...., M.P.H., Scientific Review Officer, CDC, 1600 Clifton Road NE., Mailstop E60, Atlanta, Georgia 30333... (CDC) announces the aforementioned meeting: Time And Date: 1:00 p.m.-3:00 p.m., January 14, 2014..., Centers for Disease Control and Prevention. BILLING CODE 4163-18-P...

  10. 77 FR 12844 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... 77, Number 22, Page 5257. The time and date should read as follows: Time and Date: 1 p.m.-5 p.m., March 29, 2012 (Closed). Contact Person For More Information: Gregory Anderson, M.P.H., M.S., Scientific... Office, Centers for Disease Control and Prevention. BILLING CODE 4163-18-P...

  11. 76 FR 21748 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... review.'' Contact Person for More Information: Lata Kumar, M.B.A., M.P.H., Scientific Review Officer... Disease Control and Prevention (CDC) announces the aforementioned meeting: Time and Date: 12 p.m.-4 p.m... 4163-18-P...

  12. 76 FR 9578 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Conducting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ... for More Information: Diana Bartlett, M.P.H., Scientific Review Officer, CDC, 1600 Clifton Road, N.E...:30 p.m.-3 p.m., April 13, 2011 (Closed). Place: Teleconference. Status: The meeting will be closed to... Services Office, Centers for Disease Control and Prevention. BILLING CODE 4163-18-P...

  13. 77 FR 2549 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Grants for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ..., Ph.D., M.P.H., Scientific Review Officer, CDC, 4770 Buford Highway NE., Mailstop F63, Atlanta... aforementioned SEP: Time and Date: 8:30 a.m.-5 p.m., February 21-22, 2012 (Closed). Place: Crowne Plaza Atlanta... Analysis and Services Office, Centers for Disease Control and Prevention. BILLING CODE 4163-18-P...

  14. 77 FR 20822 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ..., Number 42, Page 12844. The time and date should read as follows: Time and Date: 1 p.m.-3 p.m., April 16, 2012 (Closed). Contact Person for More Information: Gregory Anderson, M.P.H., M.S., Scientific Review..., Centers for Disease Control and Prevention. BILLING CODE 4163-18-P...

  15. 76 FR 51985 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... been changed to the following. Time 12 p.m.-2 p.m., August 31, 2011 (Closed). Contact Person for More Information: Robin Hamre, M.P.H., R.D., Scientific Review Officer, Extramural Research Program Office..., Management Analysis and Services Office, Centers for Disease Control and Prevention. BILLING CODE 4163-18-P...

  16. 78 FR 13677 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Funding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... United States (U01), FOA CE13- 001''. Contact Person for More Information: J. Felix Rogers, Ph.D., M.P.H... (CDC) announces the aforementioned meeting: Time and Date: 1:00 p.m.-4:00 p.m., April 19, 2013 (Closed..., Centers for Disease Control and Prevention. BILLING CODE 4163-18-P...

  17. 78 FR 28221 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-14

    ...''. Contact Person for More Information: Donald Blackman, Ph.D., M.P.H., Scientific Review Officer, CDC, 4770... Disease Control and Prevention (CDC) announces the aforementioned SEP: Time and Date: 12:30 p.m.-5:00 p.m... 4163-18-P...

  18. 76 FR 21749 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... review.'' Contact Person for More Information: Lata Kumar, M.B.A., M.P.H., Scientific Review Officer... Disease Control and Prevention (CDC) announces the aforementioned meeting: Time and Date: 12 p.m.-4 p.m... 4163-18-P...

  19. 78 FR 20319 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Initial Review.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-04

    ... Information: Jane Suen, Dr.P.H., M.S., M.P.H., Scientific Review Officer, CDC, 4770 Buford Highway NE...: 9:00 a.m.-6:00 p.m., May 15-16, 2013 (Closed). Place: Georgian Terrace, 659 Peachtree Street NE..., Management Analysis and Services Office, Centers for Disease Control and Prevention. BILLING CODE 4163-18-P...

  20. 75 FR 13559 - Disease, Disability, and Injury Prevention and Control Special Emphasis Panel (SEP): Long Term...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... HUMAN SERVICES Centers for Disease Control and Prevention Disease, Disability, and Injury Prevention and... Cytomegalovirus (CMV) Infection, Funding Opportunity Announcement (FOA) IP10-006, Initial Review In accordance... in response to ``Long Term Outcomes of Infants Identified with Congenital CMV Infection, FOA...

  1. Sequence and batch language programs and alarm-related ``C`` programs for the 242-A MCS. Revision 2

    SciTech Connect

    Berger, J.F.

    1995-03-01

    A Distributive Process Control system was purchased by Project B-534, ``242-A Evaporator/Crystallizer Upgrades``. This control system, called the Monitor and Control System (MCS), was installed in the 242-A Evaporator located in the 200 East Area. The purpose of the MCS is to monitor and control the Evaporator and monitor a number of alarms and other signals from various Tank Farm facilities. Applications software for the MCS was developed by the Waste Treatment Systems Engineering (WTSE) group of Westinghouse. The standard displays and alarm scheme provide for control and monitoring, but do not directly indicate the signal location or depict the overall process. To do this, WTSE developed a second alarm scheme which uses special programs, annunciator keys, and process graphics. The special programs are written in two languages; Sequence and Batch Language (SABL), and ``C`` language. The WTSE-developed alarm scheme works as described below: SABL relates signals and alarms to the annunciator keys, called SKID keys. When an alarm occurs, a SABL program causes a SKID key to flash, and if the alarm is of yellow or white priority then a ``C`` program turns on an audible horn (the D/3 system uses a different audible horn for the red priority alarms). The horn and flashing key draws the attention of the operator.

  2. Daily biofilm control and oral health: consensus on the epidemiological challenge--Latin American Advisory Panel.

    PubMed

    Rode, Sigmar de Mello; Gimenez, Xiomara; Montoya, Victoria Criado; Gómez, Mariel; Blanc, Silvia Lopez de; Medina, Marco; Salinas, Elmer; Pedroza, Janeth; Zaldivar-Chiapa, Rosi Maria; Pannuti, Claudio Mendes; Cortelli, José Roberto; Oppermann, Rui Vicente

    2012-01-01

    Our understanding of dental plaque biofilm has evolved since the nonspecific plaque hypothesis that considered plaque as a nonspecific mass of native microorganisms that, because of lack of oral hygiene, builds up in proportions great enough to overcome the host resistance threshold and affect the tooth structure and tooth supporting tissues. A great diversity of microorganisms-over 700 species-was detected in the oral cavity, and evidence shows that the investigation of specific microorganisms or associations of microorganisms as etiological agents for periodontal diseases and caries is not a simplistic approach. Although clinical evidence shows that oral mechanical hygiene is fundamental to prevent and control caries and periodontal disease, it is important to highlight that optimal control is not achieved by most individuals. Thus the complementary use of chemotherapeutic agents has been investigated as a way to overcome the deficiencies of mechanical oral hygiene habits, insofar as they reduce both plaque formation and gingival inflammation, and represent a valid strategy to change the biofilm and maintain dental and periodontal health. The role of the dental professional is to monitor patients and offer them the best recommendations to preserve oral health throughout their life. With this in mind, chemical control should be indicated as part of daily oral hygiene, together with mechanical procedures, for all individuals who present supragingival and/or subgingival biofilm, taking into account age, physical and/or psychological limitations, allergies, and other factors. PMID:23318756

  3. Likelihood alarm displays. [for human operator

    NASA Technical Reports Server (NTRS)

    Sorkin, Robert D.; Kantowitz, Barry H.; Kantowitz, Susan C.

    1988-01-01

    In a likelihood alarm display (LAD) information about event likelihood is computed by an automated monitoring system and encoded into an alerting signal for the human operator. Operator performance within a dual-task paradigm was evaluated with two LADs: a color-coded visual alarm and a linguistically coded synthetic speech alarm. The operator's primary task was one of tracking; the secondary task was to monitor a four-element numerical display and determine whether the data arose from a 'signal' or 'no-signal' condition. A simulated 'intelligent' monitoring system alerted the operator to the likelihood of a signal. The results indicated that (1) automated monitoring systems can improve performance on primary and secondary tasks; (2) LADs can improve the allocation of attention among tasks and provide information integrated into operator decisions; and (3) LADs do not necessarily add to the operator's attentional load.

  4. Health Experts’ Opinions about Tobacco Control Activities in Iran: Results from a Delphi Panel of National Experts

    PubMed Central

    Sharifi, Hooman; Masjedi, Mohammad Reza

    2012-01-01

    Background Iran signed the Framework Convention on Tobacco Control on June 16, 2003 and it was ratified by the parliament and the House of Representatives on November 6, 2005. Finally, it came into force on February 4, 2006. In this study, we aimed to evaluate health experts’ opinion about tobacco control activities in Iran. Materials and Methods This was a qualitative case study. We used a series of open-ended questionnaires to assess important information regarding Iranian National Tobacco Control law and FCTC implementation. The study population comprised of health experts. Use of this method ensured the validity of questionnaires’ contents. The first round of the questionnaire had been pre-tested in a pilot study. The final structure and lay out of questionnaires consisted of three main parts. The first part was designed with 7 multiple choice questions. Participants were able to rank answers from five (the most important) to one (the least important). The second part comprised four questions mainly on National Tobacco Control Program (NTCP) and the final part was about FCTC. Data collection was carried out between May 2010 and May 2011. In the analysis process each interview was considered as a separate case and then compared to other cases to ascertain variations in answers. Results All 40 members (100%) of the panel completed the entire process. All the participants had a consensus on tobacco control program in Iran. They believed the prevention programs to be important priorities in this regard. Tobacco Company as a governmental organization is believed to be the main barrier against tobacco control activities in Iran, and banning sales of tobacco to minors and controlling its smuggling are important factors for decreasing the supply of tobacco products. It is essential to implement comprehensive tobacco control law in Iran. Conclusion It is essential to implement comprehensive tobacco control law in Iran that covers all the priorities mentioned above

  5. Low-Subsonic-Speed Static Longitudinal Stability and Control Characteristics of a Winged Reentry-Vehicle Configuration Having Wingtip Panels that Fold up for High-Drag Reentry

    NASA Technical Reports Server (NTRS)

    Ware, George M.

    1960-01-01

    An investigation of the low-subsonic-speed static longitudinal stability and control characteristics of a model of a manned reentry-vehicle configuration capable of high-drag reentry and glide landing has been a made in the Langley free-flight tunnel. The model had a modified 63 deg delta plan-form wing with a fuselage on the upper surface. This configuration had wingtip panels designed to fold up 90 deg for the high-drag reentry phase of the flight and to extend horizontally for the glide landing. Data for the basic configurations and modifications to determine the effects of plan form, wingtip panel incidence, dihedral, and vertical position of the wingtip panels are presented without analysis.

  6. Pressurized security barrier and alarm system

    DOEpatents

    Carver, D.W.

    1995-04-11

    A security barrier for placement across a passageway is made up of interconnected pressurized tubing made up in a grid pattern with openings too small to allow passage. The tubing is connected to a pressure switch, located away from the barrier site, which activates an alarm upon occurrence of a pressure drop. A reinforcing bar is located inside and along the length of the tubing so as to cause the tubing to rupture and set off the alarm upon an intruder`s making an attempt to crimp and seal off a portion of the tubing by application of a hydraulic tool. Radial and rectangular grid patterns are disclosed. 7 figures.

  7. Pressurized security barrier and alarm system

    DOEpatents

    Carver, Don W.

    1995-01-01

    A security barrier for placement across a passageway is made up of interconnected pressurized tubing made up in a grid pattern with openings too small to allow passage. The tubing is connected to a pressure switch, located away from the barrier site, which activates an alarm upon occurrence of a pressure drop. A reinforcing bar is located inside and along the length of the tubing so as to cause the tubing to rupture and set off the alarm upon an intruder's making an attempt to crimp and seal off a portion of the tubing by application of a hydraulic tool. Radial and rectangular grid patterns are disclosed.

  8. Decision-making and response strategies in interaction with alarms: the impact of alarm reliability, availability of alarm validity information and workload.

    PubMed

    Manzey, Dietrich; Gérard, Nina; Wiczorek, Rebecca

    2014-01-01

    Responding to alarm systems which usually commit a number of false alarms and/or misses involves decision-making under uncertainty. Four laboratory experiments including a total of 256 participants were conducted to gain comprehensive insight into humans' dealing with this uncertainty. Specifically, it was investigated how responses to alarms/non-alarms are affected by the predictive validities of these events, and to what extent response strategies depend on whether or not the validity of alarms/non-alarms can be cross-checked against other data. Among others, the results suggest that, without cross-check possibility (experiment 1), low levels of predictive validity of alarms ( ≤ 0.5) led most participants to use one of two different strategies which both involved non-responding to a significant number of alarms (cry-wolf effect). Yet, providing access to alarm validity information reduced this effect dramatically (experiment 2). This latter result emerged independent of the effort needed for cross-checkings of alarms (experiment 3), but was affected by the workload imposed by concurrent tasks (experiment 4). Theoretical and practical consequences of these results for decision-making and response selection in interaction with alarm systems, as well as the design of effective alarm systems, are discussed. PMID:25224606

  9. An Undergraduate Experiment in Alarm System Design.

    ERIC Educational Resources Information Center

    Martini, R. A.; And Others

    1988-01-01

    Describes an experiment involving data acquisition by a computer, digital signal transmission from the computer to a digital logic circuit and signal interpretation by this circuit. The system is being used at the Illinois Institute of Technology. Discusses the fundamental concepts involved. Demonstrates the alarm experiment as it is used in…

  10. Adjustable electronic load-alarm relay

    DOEpatents

    Mason, Charles H.; Sitton, Roy S.

    1976-01-01

    This invention is an improved electronic alarm relay for monitoring the current drawn by an AC motor or other electrical load. The circuit is designed to measure the load with high accuracy and to have excellent alarm repeatability. Chattering and arcing of the relay contacts are minimal. The operator can adjust the set point easily and can re-set both the high and the low alarm points by means of one simple adjustment. The relay includes means for generating a signal voltage proportional to the motor current. In a preferred form of the invention a first operational amplifier is provided to generate a first constant reference voltage which is higher than a preselected value of the signal voltage. A second operational amplifier is provided to generate a second constant reference voltage which is lower than the aforementioned preselected value of the signal voltage. A circuit comprising a first resistor serially connected to a second resistor is connected across the outputs of the first and second amplifiers, and the junction of the two resistors is connected to the inverting terminal of the second amplifier. Means are provided to compare the aforementioned signal voltage with both the first and second reference voltages and to actuate an alarm if the signal voltage is higher than the first reference voltage or lower than the second reference voltage.

  11. 30 CFR 77.311 - Alarm devices.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Alarm devices. 77.311 Section 77.311 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Thermal Dryers §...

  12. 30 CFR 77.311 - Alarm devices.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Alarm devices. 77.311 Section 77.311 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Thermal Dryers §...

  13. 46 CFR 193.15-30 - Alarms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... to persons on board while the vessel is being navigated which are protected by a carbon dioxide... automatically sounded when the carbon dioxide is admitted to the space. The alarm shall be conspicuously and... arranged as to sound during the 20-second delay period prior to the discharge of carbon dioxide into...

  14. 46 CFR 76.15-30 - Alarms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Carbon Dioxide Extinguishing Systems, Details § 76.15-30 Alarms. (a) Spaces which are protected by a carbon dioxide... such spaces which will be automatically sounded when the carbon dioxide is admitted to the space....

  15. 46 CFR 76.15-30 - Alarms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Carbon Dioxide Extinguishing Systems, Details § 76.15-30 Alarms. (a) Spaces which are protected by a carbon dioxide... such spaces which will be automatically sounded when the carbon dioxide is admitted to the space....

  16. 46 CFR 76.15-30 - Alarms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Carbon Dioxide Extinguishing Systems, Details § 76.15-30 Alarms. (a) Spaces which are protected by a carbon dioxide... such spaces which will be automatically sounded when the carbon dioxide is admitted to the space....

  17. 46 CFR 76.15-30 - Alarms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Carbon Dioxide Extinguishing Systems, Details § 76.15-30 Alarms. (a) Spaces which are protected by a carbon dioxide... such spaces which will be automatically sounded when the carbon dioxide is admitted to the space....

  18. 46 CFR 76.15-30 - Alarms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Carbon Dioxide Extinguishing Systems, Details § 76.15-30 Alarms. (a) Spaces which are protected by a carbon dioxide... such spaces which will be automatically sounded when the carbon dioxide is admitted to the space....

  19. 46 CFR 193.15-30 - Alarms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... board while the vessel is being navigated which are protected by a carbon dioxide extinguishing system... when the carbon dioxide is admitted to the space. The alarm shall be conspicuously and centrally... as to sound during the 20-second delay period prior to the discharge of carbon dioxide into the...

  20. 46 CFR 193.15-30 - Alarms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... board while the vessel is being navigated which are protected by a carbon dioxide extinguishing system... when the carbon dioxide is admitted to the space. The alarm shall be conspicuously and centrally... as to sound during the 20-second delay period prior to the discharge of carbon dioxide into the...