Science.gov

Sample records for allowable working pressure

  1. 46 CFR 151.03-37 - Maximum allowable working pressure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Maximum allowable working pressure. 151.03-37 Section... working pressure. The maximum allowable working pressure shall be as defined in section VIII of the ASME Boiler and Pressure Vessel Code....

  2. 46 CFR 151.03-37 - Maximum allowable working pressure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Maximum allowable working pressure. 151.03-37 Section... working pressure. The maximum allowable working pressure shall be as defined in section VIII of the ASME Boiler and Pressure Vessel Code....

  3. 46 CFR 151.03-37 - Maximum allowable working pressure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Maximum allowable working pressure. 151.03-37 Section... working pressure. The maximum allowable working pressure shall be as defined in section VIII of the ASME Boiler and Pressure Vessel Code....

  4. 46 CFR 151.03-37 - Maximum allowable working pressure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Maximum allowable working pressure. 151.03-37 Section... working pressure. The maximum allowable working pressure shall be as defined in section VIII of the ASME Boiler and Pressure Vessel Code....

  5. 46 CFR 52.01-55 - Increase in maximum allowable working pressure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... POWER BOILERS General Requirements § 52.01-55 Increase in maximum allowable working pressure. (a) When... compatibility with the increased steam pressure. The maximum allowable working pressure on the certificate...

  6. 46 CFR 52.01-55 - Increase in maximum allowable working pressure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... POWER BOILERS General Requirements § 52.01-55 Increase in maximum allowable working pressure. (a) When... compatibility with the increased steam pressure. The maximum allowable working pressure on the certificate...

  7. 46 CFR 52.01-55 - Increase in maximum allowable working pressure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... POWER BOILERS General Requirements § 52.01-55 Increase in maximum allowable working pressure. (a) When... compatibility with the increased steam pressure. The maximum allowable working pressure on the certificate...

  8. 46 CFR 52.01-55 - Increase in maximum allowable working pressure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... POWER BOILERS General Requirements § 52.01-55 Increase in maximum allowable working pressure. (a) When... compatibility with the increased steam pressure. The maximum allowable working pressure on the certificate...

  9. 46 CFR 52.01-55 - Increase in maximum allowable working pressure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... POWER BOILERS General Requirements § 52.01-55 Increase in maximum allowable working pressure. (a) When... compatibility with the increased steam pressure. The maximum allowable working pressure on the certificate...

  10. 46 CFR 54.10-5 - Maximum allowable working pressure (reproduces UG-98).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ENGINEERING PRESSURE VESSELS Inspection, Reports, and Stamping § 54.10-5 Maximum allowable working pressure... reference; see 46 CFR 54.01-1.) (b) The maximum allowable working pressure for a vessel part is the maximum... loadings listed in UG-22 of section VIII of the ASME Boiler and Pressure Vessel Code (see 46 CFR...

  11. 46 CFR 54.10-5 - Maximum allowable working pressure (reproduces UG-98).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ENGINEERING PRESSURE VESSELS Inspection, Reports, and Stamping § 54.10-5 Maximum allowable working pressure... reference; see 46 CFR 54.01-1.) (b) The maximum allowable working pressure for a vessel part is the maximum... loadings listed in UG-22 of section VIII of the ASME Boiler and Pressure Vessel Code (see 46 CFR...

  12. 46 CFR 54.10-5 - Maximum allowable working pressure (reproduces UG-98).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... reference; see 46 CFR 54.01-1.) (b) The maximum allowable working pressure for a vessel part is the maximum... loadings listed in UG-22 of section VIII of the ASME Boiler and Pressure Vessel Code (see 46 CFR 54.01-30... thickness specified as corrosion allowance. (See UG-25 of section VIII of the ASME Boiler and...

  13. 46 CFR 54.10-5 - Maximum allowable working pressure (reproduces UG-98).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... reference; see 46 CFR 54.01-1.) (b) The maximum allowable working pressure for a vessel part is the maximum... loadings listed in UG-22 of section VIII of the ASME Boiler and Pressure Vessel Code (see 46 CFR 54.01-30... thickness specified as corrosion allowance. (See UG-25 of section VIII of the ASME Boiler and...

  14. 46 CFR 54.10-5 - Maximum allowable working pressure (reproduces UG-98).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... reference; see 46 CFR 54.01-1.) (b) The maximum allowable working pressure for a vessel part is the maximum... loadings listed in UG-22 of section VIII of the ASME Boiler and Pressure Vessel Code (see 46 CFR 54.01-30... thickness specified as corrosion allowance. (See UG-25 of section VIII of the ASME Boiler and...

  15. 38 CFR 21.4145 - Work-study allowance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Work-study allowance. 21...; Educational Assistance Allowance § 21.4145 Work-study allowance. (a) Eligibility. (1) A veteran or reservist... rate of three-quarter time or full time is eligible to receive a work-study allowance. (2) An...

  16. 38 CFR 21.4145 - Work-study allowance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false Work-study allowance. 21...; Educational Assistance Allowance § 21.4145 Work-study allowance. (a) Eligibility. (1) A veteran or reservist... rate of three-quarter time or full time is eligible to receive a work-study allowance. (2) An...

  17. 38 CFR 21.4145 - Work-study allowance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2013-07-01 2013-07-01 false Work-study allowance. 21...; Educational Assistance Allowance § 21.4145 Work-study allowance. (a) Eligibility. (1) A veteran or reservist... rate of three-quarter time or full time is eligible to receive a work-study allowance. (2) An...

  18. 38 CFR 21.4145 - Work-study allowance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Work-study allowance. 21...; Educational Assistance Allowance § 21.4145 Work-study allowance. (a) Eligibility. (1) A veteran or reservist... rate of three-quarter time or full time is eligible to receive a work-study allowance. (2) An...

  19. 38 CFR 21.9670 - Work-study allowance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Work-study allowance. 21...-study allowance. An eligible individual pursuing a program of education under 38 U.S.C. chapter 33 at a rate of pursuit of at least 75 percent may receive a work-study allowance in accordance with...

  20. 38 CFR 21.9670 - Work-study allowance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2013-07-01 2013-07-01 false Work-study allowance. 21...) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Payments-Educational Assistance § 21.9670 Work... rate of pursuit of at least 75 percent may receive a work-study allowance in accordance with...

  1. 38 CFR 21.9670 - Work-study allowance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Work-study allowance. 21...) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Payments-Educational Assistance § 21.9670 Work... rate of pursuit of at least 75 percent may receive a work-study allowance in accordance with...

  2. 38 CFR 21.9670 - Work-study allowance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false Work-study allowance. 21...) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Payments-Educational Assistance § 21.9670 Work... rate of pursuit of at least 75 percent may receive a work-study allowance in accordance with...

  3. 49 CFR 192.621 - Maximum allowable operating pressure: High-pressure distribution systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Maximum allowable operating pressure: High-pressure distribution systems. 192.621 Section 192.621 Transportation Other Regulations Relating to... STANDARDS Operations § 192.621 Maximum allowable operating pressure: High-pressure distribution systems....

  4. 49 CFR 192.623 - Maximum and minimum allowable operating pressure; Low-pressure distribution systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Maximum and minimum allowable operating pressure; Low-pressure distribution systems. 192.623 Section 192.623 Transportation Other Regulations Relating... SAFETY STANDARDS Operations § 192.623 Maximum and minimum allowable operating pressure;...

  5. 38 CFR 21.4145 - Work-study allowance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) VOCATIONAL REHABILITATION AND EDUCATION Administration of Educational Assistance Programs Payments; Educational Assistance Allowance § 21.4145 Work-study allowance. (a) Eligibility. (1) A veteran or reservist... selection criteria: (1) Need of the veteran, reservist, or eligible person to augment his or her...

  6. 38 CFR 21.9670 - Work-study allowance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2014-07-01 2014-07-01 false Work-study allowance. 21.9670 Section 21.9670 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Payments-Educational Assistance § 21.9670...

  7. Taliban authorities allow some women employees to return to work.

    PubMed

    Ahmad, K

    2000-08-26

    Following the closure of UN-supported widows' bakeries in Kabul, Afghanistan, Taliban authorities announced that they would allow 360 female employees to return to work. This invalidation is in line with the decree that bans women from working for UN agencies and international nongovernmental organizations except in the health sector. Although no explanation for the sudden policy change has been given, Taliban's Foreign Minister stated that the government has no objection to these women working at the bakeries because they are not regular employees of the UN. According to Stephanie Bunker, spokesperson for the Office of the UN coordinator for Afghanistan, the policy change is a positive step in the right direction on the part of the local authorities in Kabul. However, the UN continues to be concerned about the impact of the decree on Afghan women overall. PMID:11085704

  8. 76 FR 1504 - Pipeline Safety: Establishing Maximum Allowable Operating Pressure or Maximum Operating Pressure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-10

    ...PHMSA is issuing an Advisory Bulletin to remind operators of gas and hazardous liquid pipeline facilities of their responsibilities, under Federal integrity management (IM) regulations, to perform detailed threat and risk analyses that integrate accurate data and information from their entire pipeline system, especially when calculating Maximum Allowable Operating Pressure (MAOP) or Maximum......

  9. 77 FR 75699 - Pipeline Safety: Reporting of Exceedances of Maximum Allowable Operating Pressure

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Allowable Operating Pressure AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT... owners and operators of gas transmission pipelines that if the pipeline pressure exceeds maximum allowable operating pressure (MAOP) plus the build-up allowed for operation of pressure-limiting or...

  10. Raising the Bar: Increased Hydraulic Pressure Allows Unprecedented High Power Densities in Pressure-Retarded Osmosis

    SciTech Connect

    Straub, AP; Yip, NY; Elimelech, M

    2014-01-01

    Pressure-retarded osmosis (PRO) has the potential to generate sustainable energy from salinity gradients. PRO is typically considered for operation with river water and seawater, but a far greater energy of mixing can be harnessed from hypersaline solutions. This study investigates the power density that can be obtained in PRO from such concentrated solutions. Thin-film composite membranes with an embedded woven mesh were supported by tricot fabric feed spacers in a specially designed crossflow cell to maximize the operating pressure of the system, reaching a stable applied hydraulic pressure of 48 bar (700 psi) for more than 10 h. Operation at this increased hydraulic pressure allowed unprecedented power densities, up to 60 W/m(2) with a 3 M (180 g/L) NaCl draw solution. Experimental power densities demonstrate reasonable agreement with power densities modeled using measured membrane properties, indicating high-pressure operation does not drastically alter membrane performance. Our findings exhibit the promise of the generation of power from high-pressure PRO with concentrated solutions.

  11. 49 CFR 192.623 - Maximum and minimum allowable operating pressure; Low-pressure distribution systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... distribution systems. (a) No person may operate a low-pressure distribution system at a pressure high enough to...) No person may operate a low pressure distribution system at a pressure lower than the...

  12. 49 CFR 192.621 - Maximum allowable operating pressure: High-pressure distribution systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) No person may operate a segment of a high pressure distribution system at a pressure that exceeds the... segment of a distribution system otherwise designed to operate at over 60 p.s.i. (414 kPa) gage, unless..., particularly known corrosion and the actual operating pressures. (b) No person may operate a segment...

  13. 49 CFR 192.621 - Maximum allowable operating pressure: High-pressure distribution systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) No person may operate a segment of a high pressure distribution system at a pressure that exceeds the... segment, determined in accordance with subparts C and D of this part. (2) 60 p.s.i. (414 kPa) gage, for a segment of a distribution system otherwise designed to operate at over 60 p.s.i. (414 kPa) gage,...

  14. 49 CFR 192.621 - Maximum allowable operating pressure: High-pressure distribution systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) No person may operate a segment of a high pressure distribution system at a pressure that exceeds the... segment, determined in accordance with subparts C and D of this part. (2) 60 p.s.i. (414 kPa) gage, for a segment of a distribution system otherwise designed to operate at over 60 p.s.i. (414 kPa) gage,...

  15. 49 CFR 192.621 - Maximum allowable operating pressure: High-pressure distribution systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) No person may operate a segment of a high pressure distribution system at a pressure that exceeds the... segment, determined in accordance with subparts C and D of this part. (2) 60 p.s.i. (414 kPa) gage, for a segment of a distribution system otherwise designed to operate at over 60 p.s.i. (414 kPa) gage,...

  16. 77 FR 2351 - Agency Information Collection (Application for Work-Study Allowance): Activity Under OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ... AFFAIRS Agency Information Collection (Application for Work-Study Allowance): Activity Under OMB Review... compliance with the Paperwork Reduction Act (PRA) of 1995 (44 U.S.C. 3501-3521), this notice announces that... INFORMATION: Titles a. Application for Work-Study Allowance, VA Form 22-8691. b. Student Work-Study...

  17. Radiation counting technique allows density measurement of metals in high-pressure/ high-temperature environment

    NASA Technical Reports Server (NTRS)

    Dillion, I. G.; Nelson, P. A.; Swanson, B. S.

    1967-01-01

    Radioactive tracers induced by neutron irradiation provide a gamma ray flux proportional to the density of a metal, allowing density measurement of these metals in extreme high-temperature and high-pressure environments. This concept is applicable to most metals, as well as other substances.

  18. Cement compositions for cementing wells allowing pressure gas channeling in the cemented annulus to be controlled

    SciTech Connect

    Porcevaux, P. A.; Piot, B. M.; Vercaemer, C. J.

    1985-08-27

    The invention relates to cement compositions for cementing wells, which allow pressure gas-channeling to be effectively controlled up to more than about 485 F. The cement composition contains a styrene-butadiene latex and a stabilizer. The film of latex interrupts gas-channeling after an extremely brief path.

  19. 49 CFR 192.619 - Maximum allowable operating pressure: Steel or plastic pipelines.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: For Federal Register citations affecting § 192.619, see the List of CFR Sections Affected, which... plastic pipelines. 192.619 Section 192.619 Transportation Other Regulations Relating to Transportation... Operations § 192.619 Maximum allowable operating pressure: Steel or plastic pipelines. (a) No person...

  20. 49 CFR 192.619 - Maximum allowable operating pressure: Steel or plastic pipelines.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: For Federal Register citations affecting § 192.619, see the List of CFR Sections Affected, which... plastic pipelines. 192.619 Section 192.619 Transportation Other Regulations Relating to Transportation... Operations § 192.619 Maximum allowable operating pressure: Steel or plastic pipelines. (a) No person...

  1. 49 CFR 192.619 - Maximum allowable operating pressure: Steel or plastic pipelines.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...: For Federal Register citations affecting § 192.619, see the List of CFR Sections Affected, which... plastic pipelines. 192.619 Section 192.619 Transportation Other Regulations Relating to Transportation... Operations § 192.619 Maximum allowable operating pressure: Steel or plastic pipelines. (a) No person...

  2. 49 CFR 192.619 - Maximum allowable operating pressure: Steel or plastic pipelines.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...: For Federal Register citations affecting § 192.619, see the List of CFR Sections Affected, which... plastic pipelines. 192.619 Section 192.619 Transportation Other Regulations Relating to Transportation... Operations § 192.619 Maximum allowable operating pressure: Steel or plastic pipelines. (a) No person...

  3. 49 CFR 192.619 - Maximum allowable operating pressure: Steel or plastic pipelines.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...: For Federal Register citations affecting § 192.619, see the List of CFR Sections Affected, which... plastic pipelines. 192.619 Section 192.619 Transportation Other Regulations Relating to Transportation... Operations § 192.619 Maximum allowable operating pressure: Steel or plastic pipelines. (a) No person...

  4. Temperature and Pressure Sensors Based on Spin-Allowed Broadband Luminescence of Doped Orthorhombic Perovskite Structures

    NASA Technical Reports Server (NTRS)

    Eldridge, Jeffrey I. (Inventor); Chambers, Matthew D. (Inventor)

    2014-01-01

    Systems and methods that are capable of measuring pressure or temperature based on luminescence are discussed herein. These systems and methods are based on spin-allowed broadband luminescence of sensors with orthorhombic perovskite structures of rare earth aluminates doped with chromium or similar transition metals, such as chromium-doped gadolinium aluminate. Luminescence from these sensors can be measured to determine at least one of temperature or pressure, based on either the intense luminescence of these sensors, even at high temperatures, or low temperature techniques discussed herein.

  5. 76 FR 67558 - Proposed Information Collection (Application for Work-Study Allowance) Activity: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... AFFAIRS Proposed Information Collection (Application for Work-Study Allowance) Activity: Comment Request... Paperwork Reduction Act (PRA) of 1995, Federal agencies are required to publish notice in the Federal... comments for information needed to determine a claimant's eligibility for work-study benefits....

  6. 46 CFR 154.556 - Cargo hose: Maximum working pressure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Cargo hose: Maximum working pressure. 154.556 Section... Equipment Cargo Hose § 154.556 Cargo hose: Maximum working pressure. A cargo hose must have a maximum working pressure not less than the maximum pressure to which it may be subjected and at least 1034...

  7. 46 CFR 154.556 - Cargo hose: Maximum working pressure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Cargo hose: Maximum working pressure. 154.556 Section... Equipment Cargo Hose § 154.556 Cargo hose: Maximum working pressure. A cargo hose must have a maximum working pressure not less than the maximum pressure to which it may be subjected and at least 1034...

  8. 20 CFR 664.470 - Are paid work experiences allowable activities?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 4 2012-04-01 2012-04-01 false Are paid work experiences allowable activities? 664.470 Section 664.470 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) YOUTH ACTIVITIES UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Youth Program...

  9. 20 CFR 664.470 - Are paid work experiences allowable activities?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Are paid work experiences allowable activities? 664.470 Section 664.470 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR YOUTH ACTIVITIES UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Youth Program Design, Elements,...

  10. 20 CFR 664.470 - Are paid work experiences allowable activities?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Are paid work experiences allowable activities? 664.470 Section 664.470 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR YOUTH ACTIVITIES UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Youth Program Design, Elements,...

  11. 20 CFR 664.470 - Are paid work experiences allowable activities?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 4 2013-04-01 2013-04-01 false Are paid work experiences allowable activities? 664.470 Section 664.470 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) YOUTH ACTIVITIES UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Youth Program...

  12. 20 CFR 664.470 - Are paid work experiences allowable activities?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false Are paid work experiences allowable activities? 664.470 Section 664.470 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) YOUTH ACTIVITIES UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Youth Program...

  13. Work Status, Work Satisfaction, and Blood Pressure Among Married Black and White Women

    ERIC Educational Resources Information Center

    Hauenstein, Louise S.; And Others

    1977-01-01

    This study examined blood pressure levels of married women in relation to such work-related variables as work load, satisfaction with work, reported strain, and evaluated performance. Differences in work load were unrelated to blood pressure levels. However, currently unemployed working women had lower levels. (Author)

  14. 49 CFR 192.611 - Change in class location: Confirmation or revision of maximum allowable operating pressure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of maximum allowable operating pressure. (a) If the hoop stress corresponding to the established... locations. The corresponding hoop stress may not exceed 72 percent of the SMYS of the pipe in Class 2... pressure per § 192.620, the corresponding hoop stress may not exceed 80 percent of the SMYS of the pipe...

  15. Postadsorption Work Function Tuning via Hydrogen Pressure Control

    PubMed Central

    2015-01-01

    The work function of metal substrates can be easily tuned, for instance, by adsorbing layers of molecular electron donors and acceptors. In this work, we discuss the possibility of changing the donor/acceptor mixing ratio reversibly after adsorption by choosing a donor/acceptor pair that is coupled via a redox reaction and that is in equilibrium with a surrounding gas phase. We discuss such a situation for the example of tetrafluoro-1,4-benzenediol (TFBD)/tetrafluoro-1,4-benzoquinone (TFBQ), adsorbed on Cu(111) and Ag(111) surfaces. We use density functional theory and ab initio thermodynamics to show that arbitrary TFBD/TFBQ mixing ratios can be set using hydrogen pressures attainable in low to ultrahigh vacuum. Adjusting the mixing ratio allows modifying the work function over a range of about 1 eV. Finally, we contrast single-species submonolayers with mixed layers to discuss why the resulting inhomogeneities in the electrostatic energy above the surface have different impacts on the interfacial level alignment and the work function. PMID:26692915

  16. Effect of overtime work on 24-hour ambulatory blood pressure.

    PubMed

    Hayashi, T; Kobayashi, Y; Yamaoka, K; Yano, E

    1996-10-01

    Recently, the adverse effects of long working hours on the cardiovascular systems of workers in Japan, including "Karoshi" (death from overwork), have been the focus of social concern. However, conventional methods of health checkups are often unable to detect the early signs of such adverse effects. To evaluate the influence of overtime work on the cardiovascular system, we compared 24-hour blood pressure measurements among several groups of male white-collar workers. As a result, for those with normal blood pressure and those with mild hypertension, the 24-hour average blood pressure of the overtime groups was higher than that of the control groups; for those who periodically did overtime work, the 24-hour average blood pressure and heart rate during the busy period increased. These results indicate that the burden on the cardiovascular system of white-collar workers increases with overtime work. PMID:8899576

  17. Carbon disulfide reagent allows the characterization of nonpolar analytes by atmospheric pressure chemical ionization mass spectrometry.

    PubMed

    Owen, Benjamin C; Gao, Jinshan; Borton, David J; Amundson, Lucas M; Archibold, Enada F; Tan, Xiaoli; Azyat, Khalid; Tykwinski, Rik; Gray, Murray; Kenttämaa, Hilkka I

    2011-07-30

    While atmospheric pressure ionization methodologies have revolutionized the mass spectrometric analysis of nonvolatile analytes, limitations native to the chemistry of these methodologies hinder or entirely inhibit the analysis of certain analytes, specifically, many nonpolar compounds. Examination of various analytes, including asphaltene and lignin model compounds as well as saturated hydrocarbons, demonstrates that atmospheric pressure chemical ionization (APCI) using CS(2) as the reagent produces an abundant and stable molecular ion (M(+•)) for all model compounds studied, with the exception of completely saturated aliphatic hydrocarbons and the two amino acids tested, arginine and phenylalanine. This reagent substantially broadens the applicability of mass spectrometry to nonvolatile nonpolar analytes and also facilitates the examination of radical cation chemistry by mass spectrometry. PMID:21698674

  18. Ionization equilibrium of hydrogen in strong magnetic field with allowance for pressure effects

    SciTech Connect

    Bulik, P.; Pavlov, G. ); Potekhin, A.

    1992-01-01

    The ionization equilibrium in highly magnetized (B = 10[sup 10] to 10[sup 12]G) hydrogen is investigated at temperatures from 5 eV to 50 keV and densities in the range 10[sup [minus]3] to 10[sup 3] g/cm[sup 3]. We have used the occupation probability formalism in order to take into account the pressure and density effects. The occupation probabilities used are slightly modified as compared to those derived by Hummer and Mihalas. We find that pressure ionization degree varies with the form of microfield distribution function. The non-ionized fraction is increased by the magnetic field in most of the parameter space. It is large enough so that the bound-free absorption must be taken into account in realistic models of neutron star atmospheres.

  19. Melodic algorithms for pulse oximetry to allow audible discrimination of abnormal systolic blood pressures.

    PubMed

    Chima, Ranjit S; Ortega, Rafael; Connor, Christopher W

    2014-12-01

    An anesthesiologist must remain vigilant of the patient's clinical status, incorporating many independent physiological measurements. Oxygen saturation and heart rate are represented by continuous audible tones generated by the pulse oximeter, a mandated monitoring device. Other important clinical parameters--notably blood pressure--lack any audible representation beyond arbitrarily-configured threshold alarms. Attempts to introduce further continuous audible tones have apparently foundered; the complexity and interaction of these tones have exceeded the ability of clinicians to interpret them. Instead, we manipulate the tonal and rhythmic structure of the accepted pulse oximeter tone pattern melodically. Three melodic algorithms were developed to apply tonal and rhythmic variations to the continuous pulse oximeter tone, dependent on the systolic blood pressure. The algorithms distort the original audible pattern minimally, to facilitate comprehension of both the underlying pattern and the applied variations. A panel of anesthesia practitioners (attending anesthesiologists, residents and nurse anesthetists) assessed these algorithms in characterizing perturbations in cardiopulmonary status. Twelve scenarios, incorporating combinations of oxygen desaturation, bradycardia, tachycardia, hypotension and hypertension, were tested. A rhythmic variation in which additional auditory information was conveyed only at halftime intervals, with every other "beat" of the pulse oximeter, was strongly favored. The respondents also strongly favored the use of musical chords over single tones. Given three algorithms of tones embedded in the pulse oximeter signal, anesthesiologists preferred a melodic tone to signal a significant change in blood pressure. PMID:24474369

  20. What happens at work stays at work? Workplace supervisory social interactions and blood pressure outcomes.

    PubMed

    Wong, Jennifer H K; Kelloway, E Kevin

    2016-04-01

    We investigated the relationship between workplace supervisory social interactions and blood pressure outcomes using hourly diary entries and ambulatory blood pressure data from an experience sampling study of 55 long-term care employees. After accounting for relevant cardiovascular controls, significant effects of supervisory interactions on cardiovascular reactivity and recovery were found. Multilevel analyses revealed that negatively perceived supervisory interactions predicted higher systolic blood pressure at work (B = -1.59, p < .05, N observations = 422). Using time-lagged hierarchical regression analyses, the average perceived valence of supervisory interactions at work predicted average systolic blood pressure recovery after work (B = -14.52, p < .05, N = 33). Specifically, negatively perceived supervisory interactions at work predicted poorer cardiovascular recovery after work. Suggestions for improving practices in organizations and in experience sampling research are discussed. PMID:26641481

  1. Old flying ice-rock body in space allows a glance at its inner working.

    NASA Astrophysics Data System (ADS)

    Bieler, A. M.

    2015-12-01

    I am studying old, cold bodies of rock and ice flying through space, usually far, far away from the Sun. They are even behind the last of the big 8 balls we call our home worlds. (There were 9 balls a few yearsago, but then one of the balls was not considered a ball anymore by some people and he/she had to leave the group.)Because they are so far away from the Sun, they remain dark and very cold for the most part of their life.That is why even most of the very nervous stuff sticks on them ever since. With stuff I mean the little things that the Sun, the big 8 balls, we humans and everything else that is flying around the Sun ismade of. The nervous ones quickly change into something wind like andcan get lost. But the cold on the ice-rock bodies slows this down andthey stick around. This makes those ice-rock bodies interesting tostudy, they did not change too much since they were made.I study news sent back from a computer controlled box flying around oneof those rock-ice things that is now closer to the Sun. When thespace between such a body and the Sun gets smaller, it warms up andsome of the ice changes into wind like things. We find out how muchof what stuff is flying away from that body and at what time.Then I and my friends put those numbers into a big ass computer to findout more on how those rock-ice bodies work. Where does the wind comefrom? Do they all come from the same place or only some? Is it really the Sun's fault? How many cups of ice change into wind each day? Many questions.

  2. Influence of computer work under time pressure on cardiac activity.

    PubMed

    Shi, Ping; Hu, Sijung; Yu, Hongliu

    2015-03-01

    Computer users are often under stress when required to complete computer work within a required time. Work stress has repeatedly been associated with an increased risk for cardiovascular disease. The present study examined the effects of time pressure workload during computer tasks on cardiac activity in 20 healthy subjects. Heart rate, time domain and frequency domain indices of heart rate variability (HRV) and Poincaré plot parameters were compared among five computer tasks and two rest periods. Faster heart rate and decreased standard deviation of R-R interval were noted in response to computer tasks under time pressure. The Poincaré plot parameters showed significant differences between different levels of time pressure workload during computer tasks, and between computer tasks and the rest periods. In contrast, no significant differences were identified for the frequency domain indices of HRV. The results suggest that the quantitative Poincaré plot analysis used in this study was able to reveal the intrinsic nonlinear nature of the autonomically regulated cardiac rhythm. Specifically, heightened vagal tone occurred during the relaxation computer tasks without time pressure. In contrast, the stressful computer tasks with added time pressure stimulated cardiac sympathetic activity. PMID:25614130

  3. Working memory capacity, controlled attention and aiming performance under pressure.

    PubMed

    Wood, Greg; Vine, Samuel J; Wilson, Mark R

    2016-07-01

    This study explored the possibility that individual differences in working memory capacity (WMC) could predict those individuals who would experience attentional disruptions and performance decrements under pressure. Two WMC groups performed a Stroop handgun task under counterbalanced conditions of threat whilst wearing eye-tracking equipment that measured visual search activity and quiet eye (QE) aiming duration. Performance was measured in terms of shooting accuracy. Low-WMC individuals experienced impaired visual search time to locate the target and reduced QE durations when shooting at incongruent target words. Furthermore, the low-WMC group experienced significant reductions in shooting accuracy when anxious. Conversely, high-WMC individuals experienced no significant differences in attentional control or performance across congruency or threat conditions. Results support the suggestion that WMC is not only a good predictor of an individual's ability to control their attention but can also predict those likely to fail under pressure. PMID:26021749

  4. 49 CFR 229.103 - Safe working pressure; factor of safety.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Generators § 229.103 Safe working pressure; factor of safety. The safe working pressure for each steam generator shall be fixed by the chief mechanical officer of the carrier. The minimum factor of safety...

  5. 49 CFR 229.103 - Safe working pressure; factor of safety.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Generators § 229.103 Safe working pressure; factor of safety. The safe working pressure for each steam generator shall be fixed by the chief mechanical officer of the carrier. The minimum factor of safety...

  6. Correlation between Dermatology Life Quality Index (DLQI) scores and Work Limitations Questionnaire (WLQ) allows the calculation of percent work productivity loss in patients with psoriasis.

    PubMed

    Schmitt, Jochen; Küster, Denise

    2015-07-01

    Data on indirect costs are vital for cost-effectiveness studies from a societal perspective. In contrast to quality of life, information on productivity loss is rarely collected in psoriasis trials. We aimed to identify a model to deduce indirect costs (presenteeism and absenteeism) of psoriasis from the Dermatologic Life Quality Index (DLQI) of affected patients to facilitate health economic evaluations for psoriasis. We undertook a cross-sectional mapping study including 201 patients with physician-diagnosed psoriasis and investigated the relationship between quality of life (DLQI) and productivity loss (Work Limitations Questionnaire, WLQ--using the "output demands" subscale) using linear bootstrap regression analysis to set up an equation model allowing the calculation of percent work productivity loss per DLQI unit increase. DLQI and WLQ scores were significantly correlated (r = 0.47; p < 0.0001) The final equation model suggests a 0.545 and 0.560% decrease in productivity due to presenteeism and absenteeism per DLQI unit increase, with y-intercepts at 1.654 and 0.536, respectively. In the absence of data on indirect cost, work productivity loss due to psoriasis can be estimated from DLQI scores using the equations, Y = 0.545 × DLQI score + 1.654 for presenteeism (%) and Y = 0.560 × DLQI score + 0.536 for absenteeism (%). PMID:25940274

  7. Accessory allowing an optical cell of 6-10 000 μm path for liquids and gases to be filled in vacuum and used under pressure

    NASA Astrophysics Data System (ADS)

    Lunelli, Bruno

    2008-01-01

    An accessory for introducing liquid or gaseous samples without any contamination into an evacuated cell for optical spectrometry is described. The procedure for its use is similar to that of sample injection into a gas-liquid chromatograph, no glove box or glove bag being needed. Main benefits are the wide choice of size of the samples, their recoverability, safety, and a range of optical paths allowing to measure the absorbance of strongly absorbing liquids and gases, very dilute liquid solutions, and liquefied gases under moderate pressure. Short path spectra of gaseous water pressure standards consent quantification of water partial pressure measured in common gas cells.

  8. 49 CFR 192.611 - Change in class location: Confirmation or revision of maximum allowable operating pressure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Change in class location: Confirmation or revision...: MINIMUM FEDERAL SAFETY STANDARDS Operations § 192.611 Change in class location: Confirmation or revision... location, and the segment is in satisfactory physical condition, the maximum allowable operating...

  9. 49 CFR 192.611 - Change in class location: Confirmation or revision of maximum allowable operating pressure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Change in class location: Confirmation or revision...: MINIMUM FEDERAL SAFETY STANDARDS Operations § 192.611 Change in class location: Confirmation or revision... location, and the segment is in satisfactory physical condition, the maximum allowable operating...

  10. 49 CFR 192.611 - Change in class location: Confirmation or revision of maximum allowable operating pressure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Change in class location: Confirmation or revision...: MINIMUM FEDERAL SAFETY STANDARDS Operations § 192.611 Change in class location: Confirmation or revision... location, and the segment is in satisfactory physical condition, the maximum allowable operating...

  11. The Effect of Pressure on High- and Low-Working-Memory Students: An Elaboration of the Choking under Pressure Hypothesis

    ERIC Educational Resources Information Center

    Wang, Zuowei; Shah, Priti

    2014-01-01

    Sample: Fifty-three third and fourth graders from China participated in this study. Method: Participants' working memory (WM) was assessed by the Automated Operation Span task. Then, they solved mental addition problems of different types under low- and high-pressure conditions. Performance was analysed as a function of pressure condition,…

  12. Comparison of the thoracic flexion relaxation ratio and pressure pain threshold after overhead assembly work and below knee assembly work

    PubMed Central

    Yoo, Won-gyu

    2016-01-01

    [Purpose] The purpose of this study was to compare the thoracic flexion relaxation ratio following overhead work and below-knee work. [Subjects and Methods] Ten men (20–30 years) were recruited to this study. The thoracic flexion relaxation ratio and pressure pain threshold was measured after both overhead work and below-knee work. [Results] The pressure-pain thresholds of the thoracic erector spinae muscle decreased significantly from initial, to overhead, to below-knee work. Similarly, the thoracic flexion relaxation ratio decreased significantly from initial, to overhead, to below-knee work. [Conclusion] Below-knee work results in greater thoracic pain than overhead work. Future studies should investigate below-knee work in detail. This study confirmed the thoracic relaxation phenomenon in the mid-position of the thoracic erector spinae. PMID:26957744

  13. Seizing Workplace Learning Affordances in High-Pressure Work Environments

    ERIC Educational Resources Information Center

    Gnaur, Dorina

    2010-01-01

    Work in call centres is often presented as a form of unskilled labour characterized by routinization, technological surveillance and tight management control aimed at reaching intensive performance targets. Beyond delivering business objectives, this control and efficiency strategy is often held to produce counterproductive effects with regard to…

  14. How Ministers Understand and Address Emotional and Sexual Pressures in Ministry Work

    ERIC Educational Resources Information Center

    Reid, Genise Aria

    2012-01-01

    This study explored the perceptions of ministers in regard to how they understand and address emotional and sexual pressures encountered in ministry work. The research was guided by four questions: How do practicing ministers in the Church of Antioch describe and understand pressures in their work settings that they see as emotional or sexual in…

  15. 49 CFR 229.103 - Safe working pressure; factor of safety.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Safety Requirements Steam Generators § 229.103 Safe working pressure; factor of safety. The safe working pressure for each steam generator shall be fixed by the chief mechanical officer of the carrier. The minimum factor of safety...

  16. 49 CFR 229.103 - Safe working pressure; factor of safety.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Safety Requirements Steam Generators § 229.103 Safe working pressure; factor of safety. The safe working pressure for each steam generator shall be fixed by the chief mechanical officer of the carrier. The minimum factor of safety...

  17. 49 CFR 229.103 - Safe working pressure; factor of safety.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Safety Requirements Steam Generators § 229.103 Safe working pressure; factor of safety. The safe working pressure for each steam generator shall be fixed by the chief mechanical officer of the carrier. The minimum factor of safety...

  18. Response of multi-metric indices to anthropogenic pressures in distinct marine habitats: the need for recalibration to allow wider applicability.

    PubMed

    Fitch, Jayne E; Cooper, Keith M; Crowe, Tasman P; Hall-Spencer, Jason M; Phillips, Graham

    2014-10-15

    Sustainable exploitation of coastal ecosystems is facilitated by tools which allow reliable assessment of their response to anthropogenic pressures. The Infaunal Quality Index (IQI) and Multivariate-AMBI (M-AMBI) were developed to classify the ecological status (ES) of benthos for the Water Framework Directive (WFD). The indices respond reliably to the impacts of organic enrichment in muddy sand habitats, but their applicability across a range of pressures and habitats is less well understood. The ability of the indices to predict changes in response to pressures in three distinct habitats, intertidal muddy sand, maerl and inshore gravel, was tested using pre-existing datasets. Both responded following the same patterns of variation as previously reported. The IQI was more conservative when responding to environmental conditions so may have greater predictive value in dynamic habitats to provide an early-warning system to managers'. Re-calibration of reference conditions is necessary to reliably reflect ES in different habitats. PMID:25127499

  19. How Work Affects Divorce: The Mediating Role of Financial and Time Pressures

    ERIC Educational Resources Information Center

    Poortman, Anne-Rigt

    2005-01-01

    This study examines whether the financial and time pressures associated with spouses' working lives play a role in the relation between work and divorce during the first years of marriage. Using retrospective data from the Netherlands, the results show that divorce is more likely when the husband works on average fewer hours and the wife more…

  20. Expansion Work without the External Pressure and Thermodynamics in Terms of Quasistatic Irreversible Processes

    ERIC Educational Resources Information Center

    Schmidt-Rohr, Klaus

    2014-01-01

    We demonstrate that the formula for irreversible expansion work in most chemical thermodynamics textbooks does not apply during the expansion process. Instead of the "external pressure" P[subscript ext], the pressure P[subscript sys,mb] on the piston or other moving boundary (hence the subscript mb), which is nearly equal to the system…

  1. Overtime in Relation to Blood Pressure and Mood during Work, Leisure, and Night Time

    ERIC Educational Resources Information Center

    Rau, Renate; Triemer, Antje

    2004-01-01

    This study examined the association between characteristics of the workplace and overtime. A sample of 117 women and 126 men were assessed over 24 hours of a working day by means of a computerized diary and ambulant monitoring of blood pressure. Of the total sample, 178 participants had a contractual weekly working time of 40 hours. Of these, 106…

  2. A Demands-Resources Model of Work Pressure in IT Student Task Groups

    ERIC Educational Resources Information Center

    Wilson, E. Vance; Sheetz, Steven D.

    2010-01-01

    This paper presents an initial test of the group task demands-resources (GTD-R) model of group task performance among IT students. We theorize that demands and resources in group work influence formation of perceived group work pressure (GWP) and that heightened levels of GWP inhibit group task performance. A prior study identified 11 factors…

  3. On designing low pressure loss working spaces for a planar Stirling micromachine

    NASA Astrophysics Data System (ADS)

    Hachey, M.-A.; Léveillé, É.; Fréchette, L. G.; Formosa, F.

    2015-12-01

    In this paper, research was undertaken with the objective to design low pressure loss working spaces for a Stirling cycle micro heat engine operating from low temperature waste heat. This planar free-piston heat engine is anticipated to operate at the kHz level with mm3 displacement. Given the resonant nature of the free-piston configuration, the complexity of its working gas’ flow geometry and its projected high operating frequency, flow analysis is relatively complex. Design considerations were thus based on fast prototyping and experimentation. Results show that geometrical features, such as a sharp 90° corner between the regenerator and working spaces, are strong contributors to pressure losses. This research culminated into a promising revised working space configuration for engine start-up, as it considerably reduced total pressure losses, more than 80% at Re = 700, from the original design.

  4. Experimental Study on a Standing Wave Thermoacoustic Prime Mover with Air Working Gas at Various Pressures

    NASA Astrophysics Data System (ADS)

    Setiawan, Ikhsan; Achmadin, Wahyu N.; Murti, Prastowo; Nohtomi, Makoto

    2016-04-01

    Thermoacoustic prime mover is an energy conversion device which converts thermal energy into acoustic work (sound wave). The advantages of this machine are that it can work with air as the working gas and does not produce any exhaust gases, so that it is environmentally friendly. This paper describes an experimental study on a standing wave thermoacoustic prime mover with air as the working gas at various pressures from 0.05 MPa to 0.6 MPa. We found that 0.2 MPa is the optimum pressure which gives the lowest onset temperature difference of 355 °C. This pressure value would be more preferable in harnessing low grade heat sources to power the thermoacoustic prime mover. In addition, we find that the lowest onset temperature difference is obtained when rh /δ k ratio is 2.85, where r h is the hydraulic radius of the stack and δ k is the thermal penetration depth of the gas. Moreover, the pressure amplitude of the sound wave is significantly getting larger from 2.0 kPa to 9.0 kPa as the charged pressure increases from 0.05 MPa up to 0.6 MPa.

  5. Compressed-air work is entering the field of high pressures.

    PubMed

    Le Péchon, J Cl; Gourdon, G

    2010-01-01

    Since 1850, compressed-air work has been used to prevent shafts or tunnels under construction from flooding. Until the 1980s, workers were digging in compressed-air environments. Since the introduction of tunnel boring machines (TBMs), very little digging under pressure is needed. However, the wearing out of cutter-head tools requires inspection and repair. Compressed-air workers enter the pressurized working chamber only occasionally to perform such repairs. Pressures between 3.5 and 4.5 bar, that stand outside a reasonable range for air breathing, were reached by 2002. Offshore deep diving technology had to be adapted to TBM work. Several sites have used mixed gases: in Japan for deep shaft sinking (4.8 bar), in The Netherlands at Western Scheldt Tunnels (6.9 bar), in Russia for St. Petersburg Metro (5.8 bar) and in the United States at Seattle (5.8 bar). Several tunnel projects are in progress that may involve higher pressures: Hallandsås (Sweden) interventions in heliox saturation up to 13 bar, and Lake Mead (U.S.) interventions to about 12 bar (2010). Research on TBMs and grouting technologies tries to reduce the requirements for hyperbaric works. Adapted international rules, expertise and services for saturation work, shuttles and trained personnel matching industrial requirements are the challenges. PMID:20737925

  6. Effects of the components of positive airway pressure on work of breathing during bronchospasm

    PubMed Central

    Miro, Adelaida M; Pinsky, Michael R; Rogers, Paul L

    2004-01-01

    Introduction Partial assist ventilation reduces work of breathing in patients with bronchospasm; however, it is not clear which components of the ventilatory cycle contribute to this process. Theoretically, expiratory positive airway pressure (EPAP), by reducing expiratory breaking, may be as important as inspiratory positive airway pressure (IPAP) in reducing work of breathing during acute bronchospasm. Method We compared the effects of 10 cmH2O of IPAP, EPAP, and continuous positive airwaypressure (CPAP) on inspiratory work of breathing and end-expiratory lung volume (EELV) in a canine model of methacholine-induced bronchospasm. Results Methacholine infusion increased airway resistance and work of breathing. During bronchospasm IPAP and CPAP reduced work of breathing primarily through reductions in transdiaphragmatic pressure per tidal volume (from 69.4 ± 10.8 cmH2O/l to 45.6 ± 5.9 cmH2O/l and to 36.9 ± 4.6 cmH2O/l, respectively; P < 0.05) and in diaphragmatic pressure–time product (from 306 ± 31 to 268 ± 25 and to 224 ± 23, respectively; P < 0.05). Pleural pressure indices of work of breathing were not reduced by IPAP and CPAP. EPAP significantly increased all pleural and transdiaphragmatic work of breathing indices. CPAP and EPAP similarly increased EELV above control by 93 ± 16 ml and 69 ± 12 ml, respectively. The increase in EELV by IPAP of 48 ± 8 ml (P < 0.01) was significantly less than that by CPAP and EPAP. Conclusion The reduction in work of breathing during bronchospasm is primarily induced by the IPAP component, and that for the same reduction in work of breathing by CPAP, EELV increases more. PMID:15025781

  7. Pressures from Work, Self, and Home in the Life Stages of Married Women

    ERIC Educational Resources Information Center

    Hall, Douglas T.

    1975-01-01

    Following Lopata's (1966) model of the life cycle of the married woman's role, it was predicted and found that a woman's life stage would be related to her role pressures (work, home, self, and time), conflict, and satisfaction. Age and number of roles were not as strongly related to these variables as was life stage. (Author)

  8. Highly ionized physical vapor deposition plasma source working at very low pressure

    SciTech Connect

    Stranak, V.; Herrendorf, A.-P.; Drache, S.; Hippler, R.; Cada, M.; Hubicka, Z.; Tichy, M.

    2012-04-02

    Highly ionized discharge for physical vapor deposition at very low pressure is presented in the paper. The discharge is generated by electron cyclotron wave resonance (ECWR) which assists with ignition of high power impulse magnetron sputtering (HiPIMS) discharge. The magnetron gun (with Ti target) was built into the single-turn coil RF electrode of the ECWR facility. ECWR assistance provides pre-ionization effect which allows significant reduction of pressure during HiPIMS operation down to p = 0.05 Pa; this is nearly more than an order of magnitude lower than at typical pressure ranges of HiPIMS discharges. We can confirm that nearly all sputtered particles are ionized (only Ti{sup +} and Ti{sup ++} peaks are observed in the mass scan spectra). This corresponds well with high plasma density n{sub e} {approx} 10{sup 18} m{sup -3}, measured during the HiPIMS pulse.

  9. Highly ionized physical vapor deposition plasma source working at very low pressure

    NASA Astrophysics Data System (ADS)

    Stranak, V.; Herrendorf, A.-P.; Drache, S.; Cada, M.; Hubicka, Z.; Tichy, M.; Hippler, R.

    2012-04-01

    Highly ionized discharge for physical vapor deposition at very low pressure is presented in the paper. The discharge is generated by electron cyclotron wave resonance (ECWR) which assists with ignition of high power impulse magnetron sputtering (HiPIMS) discharge. The magnetron gun (with Ti target) was built into the single-turn coil RF electrode of the ECWR facility. ECWR assistance provides pre-ionization effect which allows significant reduction of pressure during HiPIMS operation down to p = 0.05 Pa; this is nearly more than an order of magnitude lower than at typical pressure ranges of HiPIMS discharges. We can confirm that nearly all sputtered particles are ionized (only Ti+ and Ti++ peaks are observed in the mass scan spectra). This corresponds well with high plasma density ne ˜ 1018 m-3, measured during the HiPIMS pulse.

  10. Blade Surface Pressure Distributions in a Rocket Engine Turbine: Experimental Work With On-Blade Pressure Transducers

    NASA Technical Reports Server (NTRS)

    Hudson, Susan T.; Zoladz, Thomas F.; Griffin, Lisa W.; Turner, James E. (Technical Monitor)

    2000-01-01

    Understanding the unsteady aspects of turbine rotor flowfields is critical to successful future turbine designs. A technology program was conducted at NASA's Marshall Space Flight Center to increase the understanding of unsteady environments for rocket engine turbines. The experimental program involved instrumenting turbine rotor blades with surface-mounted high frequency response pressure transducers. The turbine model was then tested to measure the unsteady pressures on the rotor blades. The data obtained from the experimental program is unique in three respects. First, much more unsteady data was obtained (several minutes per set point) than has been possible in the past. Also, two independent unsteady data acquisition systems and fundamental signal processing approaches were used. Finally, an extensive steady performance database existed for the turbine model. This allowed an evaluation of the effect of the on-blade instrumentation on the turbine's performance. This unique data set, the lessons learned for acquiring this type of data, and the improvements made to the data analysis and prediction tools will contribute to future turbine programs such as those for reusable launch vehicles.

  11. Non-invasive pressure difference estimation from PC-MRI using the work-energy equation

    PubMed Central

    Donati, Fabrizio; Figueroa, C. Alberto; Smith, Nicolas P.; Lamata, Pablo; Nordsletten, David A.

    2015-01-01

    Pressure difference is an accepted clinical biomarker for cardiovascular disease conditions such as aortic coarctation. Currently, measurements of pressure differences in the clinic rely on invasive techniques (catheterization), prompting development of non-invasive estimates based on blood flow. In this work, we propose a non-invasive estimation procedure deriving pressure difference from the work-energy equation for a Newtonian fluid. Spatial and temporal convergence is demonstrated on in silico Phase Contrast Magnetic Resonance Image (PC-MRI) phantoms with steady and transient flow fields. The method is also tested on an image dataset generated in silico from a 3D patient-specific Computational Fluid Dynamics (CFD) simulation and finally evaluated on a cohort of 9 subjects. The performance is compared to existing approaches based on steady and unsteady Bernoulli formulations as well as the pressure Poisson equation. The new technique shows good accuracy, robustness to noise, and robustness to the image segmentation process, illustrating the potential of this approach for non-invasive pressure difference estimation. PMID:26409245

  12. Non-invasive pressure difference estimation from PC-MRI using the work-energy equation.

    PubMed

    Donati, Fabrizio; Figueroa, C Alberto; Smith, Nicolas P; Lamata, Pablo; Nordsletten, David A

    2015-12-01

    Pressure difference is an accepted clinical biomarker for cardiovascular disease conditions such as aortic coarctation. Currently, measurements of pressure differences in the clinic rely on invasive techniques (catheterization), prompting development of non-invasive estimates based on blood flow. In this work, we propose a non-invasive estimation procedure deriving pressure difference from the work-energy equation for a Newtonian fluid. Spatial and temporal convergence is demonstrated on in silico Phase Contrast Magnetic Resonance Image (PC-MRI) phantoms with steady and transient flow fields. The method is also tested on an image dataset generated in silico from a 3D patient-specific Computational Fluid Dynamics (CFD) simulation and finally evaluated on a cohort of 9 subjects. The performance is compared to existing approaches based on steady and unsteady Bernoulli formulations as well as the pressure Poisson equation. The new technique shows good accuracy, robustness to noise, and robustness to the image segmentation process, illustrating the potential of this approach for non-invasive pressure difference estimation. PMID:26409245

  13. The curvilinear relationship between work pressure and momentary task performance: the role of state and trait core self-evaluations

    PubMed Central

    Hofmans, Joeri; Debusscher, Jonas; Dóci, Edina; Spanouli, Andromachi; De Fruyt, Filip

    2015-01-01

    Whereas several studies have demonstrated that core self-evaluations (CSE)–or one’s appraisals about one’s own self-worth, capabilities, and competences–relate to job outcomes, less is known about the mechanisms underlying these relationships. In the present study, we address this issue by examining the role of within- and between-person variation in CSE in the relationship between work pressure and task performance. We hypothesized that (a) work pressure relates to task performance in a curvilinear way, (b) state CSE mediates the curvilinear relationship between work pressure and task performance, and (c) the relationship between work pressure and state CSE is moderated by trait CSE. Our hypotheses were tested via a 10-day daily diary study with 55 employees in which trait CSE was measured at baseline, while work pressure, task performance, and state CSE were assessed on a daily basis. Bayesian multilevel path analysis showed that work pressure affects task performance via state CSE, with state CSE increasing as long as the employee feels that (s)he is able to handle the work pressure, while it decreases when the level of work pressure exceeds the employees’ coping abilities. Moreover, we found that for people low on trait CSE, the depleting effect of work pressure via state CSE happens for low levels of work pressure, while for people high in trait CSE the depleting effect is located at high levels of work pressure. Together, our findings suggest that the impact of work pressure on task performance is driven by a complex interplay of between- and within-person differences in CSE. PMID:26579053

  14. MHD natural convection flow along a vertical wavy surface with heat generation and pressure work

    NASA Astrophysics Data System (ADS)

    Alim, M. A.; Kabir, K. H.; Andallah, L. S.

    2016-07-01

    In this paper, the influence of pressure work on MHD natural convection flow of viscous incompressible fluid along a uniformly heated vertical wavy surface with heat generation has been investigated. The governing boundary layer equations are first transformed into a non-dimensional form using suitable set of dimensionless variables. The resulting nonlinear system of partial differential equations are mapped into the domain of a vertical flat plate and then solved numerically employing the implicit finite difference method, known as Keller-box scheme. The numerical results for the velocity profiles, temperature profiles, skin friction coefficient, the rate of heat transfers, the streamlines and the isotherms are shown graphically and skin friction coefficient and rate of heat transfer have been shown in tabular form for different values of the selective set of parameters consisting of pressure work parameter Ge, the magnetic parameter M, Prandtl number Pr, heat generation parameter Q and the amplitude of the wavy surface.

  15. Work-Hardening Induced Tensile Ductility of Bulk Metallic Glasses via High-Pressure Torsion

    NASA Astrophysics Data System (ADS)

    Joo, Soo-Hyun; Pi, Dong-Hai; Setyawan, Albertus Deny Heri; Kato, Hidemi; Janecek, Milos; Kim, Yong Chan; Lee, Sunghak; Kim, Hyoung Seop

    2015-04-01

    The mechanical properties of engineering materials are key for ensuring safety and reliability. However, the plastic deformation of BMGs is confined to narrow regions in shear bands, which usually result in limited ductilities and catastrophic failures at low homologous temperatures. The quasi-brittle failure and lack of tensile ductility undercut the potential applications of BMGs. In this report, we present clear tensile ductility in a Zr-based BMG via a high-pressure torsion (HPT) process. Enhanced tensile ductility and work-hardening behavior after the HPT process were investigated, focusing on the microstructure, particularly the changed free volume, which affects deformation mechanisms (i.e., initiation, propagation, and obstruction of shear bands). Our results provide insights into the basic functions of hydrostatic pressure and shear strain in the microstructure and mechanical properties of HPT-processed BMGs.

  16. Modernization of exhaust hoods of low-pressure sections of steam turbines manufactured by the Ural Turbine Works

    NASA Astrophysics Data System (ADS)

    Yamaltdinov, A. A.; Sakhnin, Yu. A.; Ryabchikov, A. Yu.; Evdokimov, S. Yu.; Sergach, S. V.

    2014-12-01

    Issues of modernizing the current exhaust hoods of low-pressure sections for steam turbines manufactured by the Ural Turbine Works and designing new ones with the use of modern methods of computational fluid dynamics (ANSYS CFX) are considered. A flow in the exhaust hood is simulated numerically. Verification of obtained data is performed. The use of the finite volume method allowed the three-dimensional flow in the exhaust hood of turbines of the T-100 series to be analyzed and a simple variant for improvement of its characteristics to be developed. The project data on the novel design of the exhaust hood for the T-125/150-12.8 turbine are given.

  17. Long-range correlations in heart rate variability during computer-mouse work under time pressure

    NASA Astrophysics Data System (ADS)

    Jiang, Dineng; He, Mulu; Qiu, Yihong; Zhu, Yisheng; Tong, Shanbao

    2009-04-01

    The aim of this study was to investigate the influences of time pressure on long-range correlations in heart rate variability (HRV), the effects of relaxation on the cardiovascular regulation system and the advantages of detrended fluctuation analysis (DFA) over the conventional power spectral analysis in discriminating states of the cardiovascular systems under different levels of time pressure. Volunteer subjects ( n=10, male/female=5/5) participated in a computer-mouse task consisting of five sessions, i.e. baseline session (BSS) which was free of time pressure, followed by sessions with 80% (SS80), 100% (SS100), 90% (SS90) and 150% (SS150) of the baseline time. Electrocardiogram (ECG) and task performance were recorded throughout the experiments. Two rest sessions before and after the computer-mouse work, i.e. RS1 and RS2, were also recorded as comparison. HRV series were subsequently analyzed by both conventional power spectral analysis and detrended fluctuation analysis (DFA). The long-term scaling exponent α2 by DFA was significantly lower in SS80 than that in other sessions. It was also found that short-term release of time pressure had positive influences on the cardiovascular system, i.e. the α2 in RS2 was significantly higher than that in SS80, SS100 and SS90. No significant differences were found between any two sessions by conventional power spectral analysis. Our results showed that DFA performed better in discriminating the states of cardiovascular autonomic modulation under time pressure than the conventional power spectral analysis.

  18. Complex myograph allows the examination of complex muscle contractions for the assessment of muscle force, shortening, velocity, and work in vivo

    PubMed Central

    Rahe-Meyer, Niels; Pawlak, Matthias; Weilbach, Christian; Osthaus, Wilhelm Alexander; Ruhschulte, Hainer; Solomon, Cristina; Piepenbrock, Siegfried; Winterhalter, Michael

    2008-01-01

    Background The devices used for in vivo examination of muscle contractions assess only pure force contractions and the so-called isokinetic contractions. In isokinetic experiments, the extremity and its muscle are artificially moved with constant velocity by the measuring device, while a tetanic contraction is induced in the muscle, either by electrical stimulation or by maximal voluntary activation. With these systems, experiments cannot be performed at pre-defined, constant muscle length, single contractions cannot be evaluated individually and the separate examination of the isometric and the isotonic components of single contractions is not possible. Methods The myograph presented in our study has two newly developed technical units, i.e. a). a counterforce unit which can load the muscle with an adjustable, but constant force and b). a length-adjusting unit which allows for both the stretching and the contraction length to be infinitely adjustable independently of one another. The two units support the examination of complex types of contraction and store the counterforce and length-adjusting settings, so that these conditions may be accurately reapplied in later sessions. Results The measurement examples presented show that the muscle can be brought to every possible pre-stretching length and that single isotonic or complex isometric-isotonic contractions may be performed at every length. The applied forces act during different phases of contraction, resulting into different pre- and after-loads that can be kept constant – uninfluenced by the contraction. Maximal values for force, shortening, velocity and work may be obtained for individual muscles. This offers the possibility to obtain information on the muscle status and to monitor its changes under non-invasive measurement conditions. Conclusion With the Complex Myograph, the whole spectrum of a muscle's mechanical characteristics may be assessed. PMID:18616815

  19. Multicenter historical cohort study of the relationship between shift work and blood pressure

    PubMed Central

    Gholami-Fesharaki, Mohammad; Kazemnejad, Anoshirvan; Zayeri, Farid; Rowzati, Mohsen; Sanati, Javad; Akbari, Hamed

    2014-01-01

    BACKGROUND Regarding the relationship between blood pressure (BP) and shift work (SW), previous studies have reported contradictory results. In the present study, we used Bayesian multilevel modeling to evaluate the association of SW and BP after controlling some confounding factors. METHODS Data of this multicenter historical study were extracted from annual observations of the male workers of Isfahan’s Mobarakeh Steel Company (IMSC) and Polyacryl Iran Corporation (PIC) in Isfahan, Iran, between 2003 and 2011. In this research, we assessed the effect of SW on systolic BP (SBP) and diastolic BP (DPB) with controlling body mass index, age, work experience, marriage, and education status. RESULTS A total of 8613 (IMSC, n = 5314 and PIC, n = 3299) workers participated in this study with a mean [standard deviation (SD)] age of 41.60 (8.30) and mean (SD) work experience of 16.17 (7.89) years. In this study, after controlling confounding factors, we found no significant relationship between SW and SBP and DBP. CONCLUSION In general, the results of this multicenter cohort study did not support a relationship between SW and BP. We suggest prospective studies with controlling more confounding factors in this area. PMID:25815017

  20. Relative effects of submersion and increased pressure on respiratory mechanics, work, and energy cost of breathing.

    PubMed

    Held, Heather E; Pendergast, David R

    2013-03-01

    Submersion and increased pressure (depth) characterize the diving environment and may independently increase demand on the respiratory system. To quantify changes in respiratory mechanics, this study employed a unique protocol and techniques to measure, in a hyperbaric chamber, inspiratory and expiratory alveolar pressures (interrupter technique), inspiratory and expiratory resistance in the airways (RawI and RawE, esophageal balloon technique), nitric oxide elimination (thought to correlate with Raw), inspiratory and expiratory mechanical power of breathing, and the total energy cost of ventilation. Eight healthy adult men underwent experiments at 1, 2.7, and 4.6 atmospheres absolute (ATA) in dry and fully submersed conditions. Subjects rested, cycled on an ergometer at 100 W, and rested while voluntarily matching their ventilation to their own exercise hyperpnea (isocapnic simulated exercise ventilation). During isocapnic simulated exercise ventilation, increased O2 uptake (above rest values) resulted from increased expired ventilation. RawI decreased with submersion (mean 43% during rest and 20% during exercise) but increased from 1 to 4.6 ATA (19% during rest and 75% during exercise), as did RawE (53% decrease with submersion during rest and 10% during exercise; 9% increase from 1 to 4.6 ATA during rest and 66% during exercise). Nitric oxide elimination did not correlate with Raw. Depth increased inspiratory mechanical power of breathing during rest (40%) and exercise (20%). Expiratory mechanical power of breathing was largely unchanged. These results suggest that the diving environment affects ventilatory mechanics primarily by increasing Raw, secondary to increased gas density. This necessitates increased alveolar pressure and increases the work and energy cost of breathing as the diver descends. These findings can inform physician assessment of diver fitness and the pulmonary risks of hyperbaric O2 therapy. PMID:23305982

  1. Influences of working pressure on properties for TiO2 films deposited by DC pulse magnetron sputtering.

    PubMed

    Zhang, Can; Ding, Wanyu; Wang, Hualin; Chai, Weiping; Ju, Dongying

    2009-01-01

    TiO2 films were deposited at room temperature by DC pulse magnetron sputtering system. The crystalline structures, morphological features and photocatalytic activity of TiO2 films were systematically investigated by X-ray diffraction (XRD), atomic force microscopy (AFM) and ultraviolet spectrophotometer, respectively. The results indicated that working pressure was the key deposition parameter influencing the TiO2 film phase composition at room temperature, which directly affected its photocatalytic activity. With increasing working pressure, the target self-bias decreases monotonously. Therefore, low temperature TiO2 phase (anatase) could be deposited with high working pressure. The anatase TiO2 films deposited with 1.4 Pa working pressure displayed the highest photocatalytic activity by the decomposition of Methyl Orange solution, which the degradation rate reached the maximum (35%) after irradiation by ultraviolet light for 1 h. PMID:19803076

  2. ZK-5: a CO₂-selective zeolite with high working capacity at ambient temperature and pressure.

    PubMed

    Liu, Qingling; Pham, Trong; Porosoff, Marc D; Lobo, Raul F

    2012-11-01

    The increased carbon dioxide concentration in the atmosphere caused by combustion of fossil fuels has been a leading contributor to global climate change. The adsorption-driven pressure or vacuum swing (PSA/VSA) processes are promising as affordable means for the capture and separation of CO₂. Herein, an 8-membered-ring zeolite ZK-5 (Framework Type Code: KFI) exchanged with different cations (H⁺, Li⁺, Na⁺, K⁺, Mg²⁺, Ca²⁺) was synthesized as novel CO₂ adsorbent. The samples were characterized by SEM, energy-dispersive X-ray spectroscopy (EDAX), XRD, and gas adsorption (CO₂ and N₂). The Toth adsorption model was used to describe the CO₂ adsorption isotherms, and the isosteric heats of adsorption were calculated. CO₂ capture adsorbent evaluation criteria such as working capacity, regenerability and CO₂/N₂ selectivity were applied to evaluate the zeolite adsorbents for PSA/VSA applications. The in situ FTIR CO₂ adsorption spectra show that physisorption accounts for the largest fraction of the total CO₂ adsorbed. The CO₂ adsorption analysis shows that Mg-ZK-5 is the most promising adsorbent for PSA applications with the highest working capacity (ΔN(CO₂)=2.05 mmol g⁻¹), excellent selectivity (α(CO₂/N₂)=121), and low isosteric heat. Li-, Na- and K-ZK-5 with good working capacity (ΔN(CO₂)=1.55-2.16 mmol g⁻¹) and excellent selectivity (α(CO₂/N₂)=103-128) are promising CO₂ adsorbents for the VSA working region. PMID:22907818

  3. Effect of a suspension seat support chair on the trunk flexion angle and gluteal pressure during computer work

    PubMed Central

    Yoo, Won-gyu

    2015-01-01

    [Purpose] We assessed the effects of a suspension seat support chair on the trunk flexion angle and gluteal pressure during computer work. [Subjects] Ten males were recruited. [Methods] The suspension seat support was developed to prevent abnormal gluteal pressure and a slumped sitting posture during computer work. The gluteal pressure was measured with a TekScan system and the trunk flexion angle was measured with a video camera, to compare the differences between a general chair and the suspension seat support. [Results] The gluteal peak pressures were decreased significantly in the suspension seat support versus the general chair. The trunk flexion angle was also decreased significantly in the suspension seat support compared with the general chair. [Conclusions] This study suggests that the suspension seat support chair contributes to preventing abnormal gluteal pressure and a slumped sitting posture. PMID:26504341

  4. Radial theory of the ion current onto a probe in a low-pressure plasma with allowance for volume ionization and collisions with neutrals

    SciTech Connect

    Sysun, V. I.; Ignakhin, V. S.

    2011-04-15

    The ion current onto a spherical or cylindrical probe is analyzed in the cold-ion approximation with allowance for ionization and collisions with neutrals. An expression for the ion density that takes into account both ionization and collision in the finite-size perturbed region is derived. The current-voltage characteristics for the dimensionless parameters r{sub p}/{lambda}{sub D} = 0.0001-10, {lambda}{sub i}/{lambda}{sub D} = 0.01 - {infinity}, and z{lambda}{sub D}/(kT{sub e}/M){sup 1/2} = 0-5 are determined by numerically solving Poisson's equation, and the corresponding approximate expressions are obtained.

  5. The relationship of blood lead to blood pressure in a longitudinal study of working men.

    PubMed

    Weiss, S T; Muñoz, A; Stein, A; Sparrow, D; Speizer, F E

    1986-05-01

    The relationship of lead exposure to blood pressure has been examined in a longitudinal study of a cohort of 89 Boston, Massachusetts, policemen. At the baseline examination, subjects had a blood lead determination and three consecutive blood pressure measurements. Triplicate blood pressure measurements were also taken at years 3, 4, and 5. Multivariate analysis revealed that, after correction for previous systolic blood pressure, body mass index, age, and smoking, a high level of blood lead was a significant predictor of subsequent elevation of systolic pressure. Bootstrap simulations of these models provided supporting evidence for the observed associations. These data suggest that lead exposure can significantly affect systolic pressure. PMID:3485920

  6. Relationship of blood lead to blood pressure in a longitudinal study of working men

    SciTech Connect

    Weiss, S.T.; Munoz, A.; Stein, A.; Sparrow, D.; Speizer, F.E.

    1986-05-01

    The relationship of lead exposure to blood pressure has been examined in a longitudinal study of a cohort of 89 Boston, Massachusetts, policemen. At the baseline examination, subjects had a blood lead determination and three consecutive blood pressure measurements. Triplicate blood pressure measurements were also taken at years 3, 4, and 5. Multivariate analysis revealed that, after correction for previous systolic blood pressure, body mass index, age, and smoking, a high level of blood lead was a significant predictor of subsequent elevation of systolic pressure. Bootstrap simulations of these models provided supporting evidence for the observed associations. These data suggest that lead exposure can significantly affect systolic pressure.

  7. Application of TPM indicators for analyzing work time of machines used in the pressure die casting

    NASA Astrophysics Data System (ADS)

    Borkowski, Stanisław; Czajkowska, Agnieszka; Stasiak-Betlejewska, Renata; Borade, Atul B.

    2014-05-01

    The article presents the application of total productive maintenance (TPM) to analyze the working time indicators of casting machines with particular emphasis on failures and unplanned downtime to reduce the proportion of emergency operation for preventive maintenance and diagnostics. The article presents that the influence of individual factors of complex machinery maintenance (TPM) is different and depends on the machines' modernity level. In an original way, by using correlation graphs, research findings on the impact of individual TPM factors on the castings quality were presented and interpreted. The examination results conducted for machines with varying modernity degrees allowed to determine changes within the impact of individual TPM factors depending on machine parameters. These results provide a rich source of information for the improvement processes on casting quality of the foundry industry that satisfies the automotive industry demand.

  8. Cellular assay optimization: part II: the use of a simple integrated robotic work cell to allow the multiplexed batching of cellular assays.

    PubMed

    Macmillan, Marie A; Orme, Jonathan P; Roberts, Karen

    2011-10-01

    This report describes the implementation of an automated work cell with commercially available hardware and software, capable of handling up to 15 separate reagents for performing 96-well or 384-well assays but with a small footprint and only a single liquid dispenser and two plate washers. Extremely flexible software was used to enable this simple work cell to perform processes that would traditionally require a much larger, more expensive automation platform. With the development of the C-Myc assays for the targets DYRK, BMX, PERK, and FAK, the authors describe a software solution to multibatch assays to run simultaneously, reducing reagent dead volume and increasing the efficiency of running multiple assays such that the time to generate data across multiple targets was significantly shortened. Although a larger automated system with multiple robotic arms and extensive equipment would also be able to process multiple assays simultaneously, the work cell we have described represents an inexpensive and flexible, easily upgradable option suitable for a wider range of labs. PMID:21844326

  9. Effects of working pressure on physical properties of tungsten-oxide thin films sputtered from oxide target

    SciTech Connect

    Riech, I.; Acosta, M.; Pena, J. L.; Bartolo-Perez, P.

    2010-03-15

    Tungsten-oxide films were deposited on glass substrates from a metal-oxide target by nonreactive radio-frequency sputtering. The authors have studied the effect that changing Ar gas pressure has on the electrical, optical, and chemical composition in the thin films. Resistivity of WO{sub 3} changed ten orders of magnitude with working gas pressure values from 20 to 80 mTorr. Thin films deposited at 20 mTorr of Ar sputtering pressure showed lower resistivity and optical transmittance. X-ray photoelectron spectroscopy (XPS) measurements revealed similar chemical composition for all samples irrespective of Ar pressure used. However, XPS analyses of the evolution of W 4f and O 1s peaks indicated a mixture of oxides dependent on the Ar pressure used during deposition.

  10. Auto-ignition of lubricating oil working at high pressures in a compressor for an air conditioner.

    PubMed

    Kim, Chul Jin; Choi, Hyo Hyun; Sohn, Chae Hoon

    2011-01-15

    Auto-ignition of lubricating oil working in a compressor for an air conditioner is studied experimentally. The adopted lubricating oil is an unknown mixture with multi-components and known to have flash point temperature of 170 °C. First, its auto-ignition temperature is measured 365 °C at atmospheric pressure. The lubricating oil works under high-pressure condition up to 30 atm and it is heated and cooled down repeatedly. Accordingly, auto-ignition temperatures or flammable limits of lubricating oil are required at high pressures with respect to fire safety. Because there is not a standard test method for the purpose, a new ignition-test method is proposed in this study and thereby, auto-ignition temperatures are measured over the pressure range below 30 atm. The measured temperatures range from 215 °C to 255 °C and they strongly depend on pressure of gas mixture consisting of oil vapor, nitrogen, and oxygen. They are close to flash point temperature and the lubricating oil can be hazardous when it works for high-pressure operating condition and abundant air flows into a compressor. PMID:20934810

  11. Numerical investigations on pressurized AL-composite vessel response to hypervelocity impacts: Comparison between experimental works and a numerical code

    NASA Astrophysics Data System (ADS)

    Mespoulet, Jérôme; Plassard, Fabien; Hereil, Pierre-Louis

    2015-09-01

    Response of pressurized composite-Al vessels to hypervelocity impact of aluminum spheres have been numerically investigated to evaluate the influence of initial pressure on the vulnerability of these vessels. Investigated tanks are carbon-fiber overwrapped prestressed Al vessels. Explored internal air pressure ranges from 1 bar to 300 bar and impact velocity are around 4400 m/s. Data obtained from experiments (Xray radiographies, particle velocity measurement and post-mortem vessels) have been compared to numerical results given from LS-DYNA ALE-Lagrange-SPH full coupling models. Simulations exhibit an under estimation in term of debris cloud evolution and shock wave propagation in pressurized air but main modes of damage/rupture on the vessels given by simulations are coherent with post-mortem recovered vessels from experiments. First results of this numerical work are promising and further simulation investigations with additional experimental data will be done to increase the reliability of the simulation model. The final aim of this crossed work is to numerically explore a wide range of impact conditions (impact angle, projectile weight, impact velocity, initial pressure) that cannot be explore experimentally. Those whole results will define a rule of thumbs for the definition of a vulnerability analytical model for a given pressurized vessel.

  12. Work.

    ERIC Educational Resources Information Center

    Haines, Annette M.

    2003-01-01

    Draws upon Maria Montessori's writings to examine work as a universal human tendency throughout life. Discusses the work of adaptation of the infant, work of "psycho-muscular organism" for the preschooler, work of the imagination for the elementary child, community work of the adolescent, and work of the adult. Asserts that Montessorians' role is…

  13. Growth of non-polar ZnO thin films with different working pressures by plasma enhanced chemical vapor deposition

    NASA Astrophysics Data System (ADS)

    Chao, Chung-Hua; Wei, Da-Hua

    2014-11-01

    Non-polar coexisting m-plane (10\\bar{1}0) and a-plane (11\\bar{2}0) zinc oxide (ZnO) thin films have been synthesized onto commercial silicon (100) substrates by using plasma enhanced chemical vapor deposition (PECVD) system at different working pressures. The effects of the working pressure on crystal orientation, microstructure, surface morphology, and optical properties of the ZnO thin films were investigated. From the X-ray diffraction patterns, the non-polar ZnO thin films were successfully synthesized at the working pressures of 6 and 9 Torr, respectively. The non-polar ZnO thin films showed stripes-like surface morphology and with smooth surface roughness (˜3.53 nm) was performed by field emission scanning electron microscope (FE-SEM) and atomic force microscope (AFM), respectively. All the ZnO films show a remarkable near-band-edge (NBE) emission peak located at ultraviolet (UV) band accompanying a negligible deep-level (DL) emission at visible region detected by photoluminescence (PL) spectra at room temperature. From the above systematic measurement analysis, indicating the better crystallinity and optical character of ZnO thin film was improved with reducing the working pressure. The wettability of non-polar ZnO thin films was also explored in this presented article.

  14. Accountability Pressure and Non-Achievement Student Behaviors. Working Paper 122

    ERIC Educational Resources Information Center

    Holbein, John B.; Ladd, Helen F.

    2015-01-01

    In this paper we examine how failing to make adequate yearly progress under No Child Left Behind (NCLB), and the accountability pressure that ensues, affects various non-achievement student behaviors. Using administrative data from North Carolina and leveraging a discontinuity in the determination of school failure, we examine the causal impact of…

  15. Taking Pressure off Families: Child-Care Subsidies Lessen Mothers' Work-Hour Problems

    ERIC Educational Resources Information Center

    Press, Julie E.; Fagan, Jay; Laughlin, Lynda

    2006-01-01

    We use the Philadelphia Survey of Child Care and Work to model the effect of child-care subsidies and other ecological demands and resources on the work hour, shift, and overtime problems of 191 low-income urban mothers. Comparing subsidy applicants who do and do not receive cash payments for child care, we find that mothers who receive subsidies…

  16. How Do Antihypertensive Drugs Work? Insights from Studies of the Renal Regulation of Arterial Blood Pressure.

    PubMed

    Digne-Malcolm, Holly; Frise, Matthew C; Dorrington, Keith L

    2016-01-01

    Though antihypertensive drugs have been in use for many decades, the mechanisms by which they act chronically to reduce blood pressure remain unclear. Over long periods, mean arterial blood pressure must match the perfusion pressure necessary for the kidney to achieve its role in eliminating the daily intake of salt and water. It follows that the kidney is the most likely target for the action of most effective antihypertensive agents used chronically in clinical practice today. Here we review the long-term renal actions of antihypertensive agents in human studies and find three different mechanisms of action for the drugs investigated. (i) Selective vasodilatation of the renal afferent arteriole (prazosin, indoramin, clonidine, moxonidine, α-methyldopa, some Ca(++)-channel blockers, angiotensin-receptor blockers, atenolol, metoprolol, bisoprolol, labetolol, hydrochlorothiazide, and furosemide). (ii) Inhibition of tubular solute reabsorption (propranolol, nadolol, oxprenolol, and indapamide). (iii) A combination of these first two mechanisms (amlodipine, nifedipine and ACE-inhibitors). These findings provide insights into the actions of antihypertensive drugs, and challenge misconceptions about the mechanisms underlying the therapeutic efficacy of many of the agents. PMID:27524972

  17. How Do Antihypertensive Drugs Work? Insights from Studies of the Renal Regulation of Arterial Blood Pressure

    PubMed Central

    Digne-Malcolm, Holly; Frise, Matthew C.; Dorrington, Keith L.

    2016-01-01

    Though antihypertensive drugs have been in use for many decades, the mechanisms by which they act chronically to reduce blood pressure remain unclear. Over long periods, mean arterial blood pressure must match the perfusion pressure necessary for the kidney to achieve its role in eliminating the daily intake of salt and water. It follows that the kidney is the most likely target for the action of most effective antihypertensive agents used chronically in clinical practice today. Here we review the long-term renal actions of antihypertensive agents in human studies and find three different mechanisms of action for the drugs investigated. (i) Selective vasodilatation of the renal afferent arteriole (prazosin, indoramin, clonidine, moxonidine, α-methyldopa, some Ca++-channel blockers, angiotensin-receptor blockers, atenolol, metoprolol, bisoprolol, labetolol, hydrochlorothiazide, and furosemide). (ii) Inhibition of tubular solute reabsorption (propranolol, nadolol, oxprenolol, and indapamide). (iii) A combination of these first two mechanisms (amlodipine, nifedipine and ACE-inhibitors). These findings provide insights into the actions of antihypertensive drugs, and challenge misconceptions about the mechanisms underlying the therapeutic efficacy of many of the agents. PMID:27524972

  18. CONFERENCE NOTE: Comité Consultatif pour la Masse et les grandeurs apparentées (CCM), High Pressure and Medium Pressure Working Groups, Second International Seminar on Pressure Metrology from 1 kPa to 1 GPa

    NASA Astrophysics Data System (ADS)

    1992-01-01

    The seminar will be held from 2 to 4 June 1993, preceding the next meeting of the CCM, at the Laboratoire National d'Essais (LNE), 1 rue Gaston Boissier, 75015 Paris, France. Scope of the Seminar The purpose of the seminar is to review the state of the art of pressure measurements in the 1 kPa to 1 GPa range and to present original and innovative contributions from standards laboratories and industry. Main Topics The seminar will be organized in six sessions as follows: Liquid-column manometers Piston gauge pressure standards Properties of liquids and gases relevant to pressure metrology Pressure transducers and transfer standards Pressure standard comparison (methods and results) Dynamic pressure measurements. Each topic will be introduced by a review paper presented by a session chairman. A final session, coordinated by Dr G F Molinar (IMGC), Chairman of the CCM High Pressure Working Group, and Dr P Stuart (NPL), Chairman of the CCM Medium Pressure Working Group, will deal with: Actual limits of accuracy of static pressure measurements in fluid media Fundamental problems in pressure metrology between I kPa and 1 GPa. Call for Papers Papers should be prepared for oral presentation and will be refereed by the session chairmen. The Proceedings will be published as a special issue of Metrologia. Papers should be written according to the instructions for authors printed on the inside back cover of this journal. A one-page abstract should be sent to Dr Molinar at the IMGC, to arrive before 31 January 1993. A participation fee of 900 FFr (175 US) will be charged. This will cover general expenses and a copy of the Proceedings. Hotel reservations, meals and transport are not included. Organizers For further information please contact: 1993 CCM Pressure Seminar, Dr G F Molinar, Istituto di Metrologia "G Colonnetti", Strada delle Cacce 73, 1-10135 Torino, Italy telephone (39) 11 39771; telex 212209 IMGCTO-I; fax (39) 11 346761. Contact at the LNE: J C Legras, telephone (33

  19. Psychosocial Work Factors, Blood Pressure and Psychological Strain in Male Bus Operators

    PubMed Central

    CENDALES, Boris; USECHE, Sergio; GÓMEZ, Viviola

    2014-01-01

    The research aim was to predict the bus operators’ blood pressure (BP) and psychological strain using a combination of the Job-Demand Control (JDC) and Effort-Reward Imbalance (ERI) models. The study was conducted with a sample of 139 bus operators in the city of Bogotá (Colombia), who answered a questionnaire that included the Job Content Questionnaire (JCQ), the ERI Questionnaire, and the General Health Questionnaire (GHQ). Four consecutive BP readings taken in the workplace were averaged to calculate an estimation of the bus operators’ BP. By conducting multiple linear regressions it was found that, taken together, JDC and ERI models explain 10% (F(11,139)=2,502; p=0.00) of systolic BP variance, and 34% (F(6,139)=8,638; p=0.00) of psychological strain variance. These results suggest that the JDC and ERI predictors provide complementary information which increases the probability of accurately model the bus operators’ health. PMID:24869893

  20. Pressure-Volume Work Exercises Illustrating the First and Second Laws.

    ERIC Educational Resources Information Center

    Hoover, William G.; Moran, Bill

    1979-01-01

    Presented are two problem exercises involving rapid compression and expansion of ideal gases which illustrate the first and second laws of thermodynamics. The first problem involves the conversion of gravitational energy into heat through mechanical work. The second involves the mutual interaction of two gases through an adiabatic piston. (BT)

  1. An approach based on ultrahigh performance liquid chromatography-atmospheric pressure chemical ionization-mass spectrometry allowing the quantification of both individual phytosteryl and phytostanyl fatty acid esters in complex mixtures.

    PubMed

    Scholz, Birgit; Menzel, Nicole; Lander, Vera; Engel, Karl-Heinz

    2016-01-15

    A method for the analysis of both individual phytosteryl and phytostanyl fatty acid esters in complex mixtures was established. The approach was based on a previously not described combination of three elements: (i) the formation of [M-FA+H](+) fragment ions via APCI (atmospheric pressure chemical ionization), (ii) a highly efficient UHPLC-based separation on a 1.7 μ C8 column, previously established for phytostanyl fatty acid esters, allowing the distinction of individual fatty acid esters sharing the same sterol/stanol nucleus and of isotope peaks of phytosteryl fatty acid esters and corresponding phytostanyl fatty acid esters based on these [M-FA+H](+) fragment ions, and (iii) the adjustment of the APCI conditions allowing the differential APCI-MS-SIM (single ion monitoring) detection of phytostanyl esters of linoleic and linolenic acid based on their distinct formation of a [M+H](+) ion. The usefulness of the methodology was demonstrated by the analysis of a commercially available enriched margarine. Two runs per sample allowed the quantification of 35 target analytes; the total amounts of esters were between 124.7 and 125.3g/kg, being in good agreement with the labelled 125 g/kg. Validation data were elaborated for 35 individual fatty acid esters of sitosterol, campesterol, brassicasterol, stigmasterol, sitostanol and campestanol. Recovery rates ranged from 95 to 106%; the coefficients of variation were consistently <5%, except for stigmasteryl-18:1. The approach describes for the first time a quantification of both individual phytosteryl and phytostanyl fatty acid esters and thus closes an analytical gap related to this class of health-relevant food constituents. PMID:26718186

  2. [Comparison of CPAP and BiPAP equipment with reference to work of breathing, pressure and flow constancy].

    PubMed

    Raschke, F; Fischer, J

    1995-03-01

    We have investigated mask pressure curves and nasal flow during nasal C- and BiPAP ventilation in the recumbent position. Nasal spontaneous breathing, C- and BiPAP-applications of 10 and 10/7 cmH2O have been investigated in 7 patients and 4 controls. With aid of an automatic computerised analysis each in- and expiratory phase has been normalized by time and plotted as pressure-volume-loop from pooled data. The ventilators showed significant intra- and inter-machine differences. The investigations are considered as approach to real assessment of patient's work of breathing on home ventilators. They clearly show that ventilators have individual patterns, which should be considered carefully, long term machine-according effects are not yet known. PMID:7617616

  3. Commitment under pressure: experienced therapists' inner work during difficult therapeutic impasses.

    PubMed

    Moltu, Christian; Binder, Per-Einar; Nielsen, Geir Høstmark

    2010-05-01

    Interviews were conducted to explore the recall of impasse experiences of 12 highly skilled and experienced therapists. Participants were interviewed in depth individually about a specific impasse from their experience that resolved successfully. The transcribed interviews were analysed using qualitative methodology. The authors found that participants understood their reported impasse experiences as important for their professional development. The category of "helpful subjective presence" describes the mode of being with patients that the participants found therapeutic. The categories of "losing hope" and "difficult feelings in the therapist in the here and now" are processes that threaten the helpful presence. The participants' inner work on the two latter categories is identified as a key to the successful resolution of impasses. PMID:20099206

  4. Performance-based contracting in home-care work in The Netherlands: professionalism under pressure?

    PubMed

    Oomkens, Rosanne; Hoogenboom, Marcel; Knijn, Trudie

    2016-07-01

    supportive managers for both autonomy and job satisfaction (H4) can help home-care organisations improve the attractiveness of home-care work. PMID:25728063

  5. Stress in highly demanding IT jobs: transformational leadership moderates the impact of time pressure on exhaustion and work-life balance.

    PubMed

    Syrek, Christine J; Apostel, Ella; Antoni, Conny H

    2013-07-01

    The objective of this article is to investigate transformational leadership as a potential moderator of the negative relationship of time pressure to work-life balance and of the positive relationship between time pressure and exhaustion. Recent research regards time pressure as a challenge stressor; while being positively related to motivation and performance, time pressure also increases employee strain and decreases well-being. Building on the Job Demand-Resources model, we hypothesize that transformational leadership moderates the relationships between time pressure and both employees' exhaustion and work-life balance such that both relationships will be weaker when transformational leadership is higher. Of seven information technology organizations in Germany, 262 employees participated in the study. Established scales for time pressure, transformational leadership, work-life balance, and exhaustion were used, all showing good internal consistencies. The results support our assumptions. Specifically, we find that under high transformational leadership the impact of time pressure on exhaustion and work-life balance was less strong. The results of this study suggest that, particularly under high time pressure, transformational leadership is an important factor for both employees' work-life balance and exhaustion. PMID:23834443

  6. Work Capability and physiological effects predictive studies. 4: In He-O2 excursions to pressures of 400- 800- 1200- and 1600 feet of sea water

    NASA Technical Reports Server (NTRS)

    Lambertsen, C. J. (Editor); Gelfand, R. (Editor); Clark, J. M. (Editor); Fletcher, M. E. (Editor)

    1978-01-01

    Experiments which exposed men in chambers, breathing helium with oxygen, to progressive increases of pressure equivalent to 400-800-1200-1600 feet of sea water (fsw) were conducted. Rates of compression and exposure to stable high pressure. Goals included: 1) determination of the specific character and time course of onset of physiological and performance decrements during the intentionally rapid compressions, and determination of rates of adaptation on reaching stable elevated pressure; 2) investigation of accelerated methods for decompression in deep saturation excursion diving; and 3) determination of competence in practical work performed in water at pressures equivalent to the extreme diving depths of 1200 and 1600 fsw.

  7. Variation of Pressure with Depth of Water: Working with High-Tech and Low-Cost Materials

    ERIC Educational Resources Information Center

    Ornek, Funda; Zziwa, Byansi Jude; Taganahan, Teresita D.

    2013-01-01

    When you dive underwater, you feel the pressure on your ears and, as you dive deeper, more pressure is felt. This article presents an activity that teachers might find useful for demonstrating the relationship between water depth and pressure. (Contains 5 figures and 1 table.)

  8. 49 CFR 266.11 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Allowable costs. 266.11 Section 266.11... TRANSPORTATION ACT § 266.11 Allowable costs. Allowable costs include only the following costs which are properly allocable to the work performed: Planning and program operation costs which are allowed under...

  9. Alternating current-driven non-thermal arc plasma torch working with air medium at atmospheric pressure

    NASA Astrophysics Data System (ADS)

    Ni, Guohua; Lin, Qifu; Li, Lei; Cheng, Cheng; Chen, Longwei; Shen, Jie; Lan, Yan; Meng, Yuedong

    2013-11-01

    This work is devoted to the investigation of the discharge characteristics of high-frequency alternating current (ac) plasma torch working with air medium using electrical and spectroscopic techniques. A simple structure and compact ac plasma torch associated with a resonance power supply allows the generation of low power discharges (lower than 1 kW) with high voltage and low current. The discharge shows a negative resistance characteristic, and its curve shifts up with gas flow increased. The effects of power on the emission intensity of NO (A 2Σ+ → X 2Π), OH (A 2Σ → X 2Π, 0-0), N2(C 3Πu → B 3Πg), Hα and O (3p^{5}P \\to 3S^{5}S_{2}^{0}) and their spatial distributions in plasma jet axial direction were investigated. It has been found that the emission intensities of NO, OH, N2, Hα and O rise with an increase in power dissipation. With increasing axial distances of plasma jet from nozzle exit, the emission intensity of OH increases and then decreases, while the emission intensities of other species decrease sharply. The vibrational temperature is much higher than the gas temperature, which demonstrates the ac-driven arc discharge deviation from thermal equilibrium plasma.

  10. Overexpression of EAR1 and SSH4 that encode PPxY proteins in the multivesicular body provides stability to tryptophan permease Tat2, allowing yeast cells to grow under high hydrostatic pressure

    NASA Astrophysics Data System (ADS)

    Hiraki, Toshiki; Usui, Keiko; Abe, Fumiyoshi

    2010-12-01

    Tryptophan uptake in yeast Saccharomyces cerevisiae is susceptible to high hydrostatic pressure and it limits the growth of tryptophan auxotrophic (Trp-) strains under pressures of 15-25 MPa. The susceptibility of tryptophan uptake is accounted for by the pressure-induced degradation of tryptophan permease Tat2 occurring in a Rsp5 ubiquitin ligase-dependent manner. Ear1 and Ssh4 are multivesicular body proteins that physically interact with Rsp5. We found that overexpression of either of the EAR1 or SSH4 genes enabled the Trp- cells to grow at 15-25 MPa. EAR1 and SSH4 appeared to provide stability to the Tat2 protein when overexpressed. The result suggests that Ear1 and Ssh4 negatively regulate Rsp5 on ubiquitination of Tat2. Currently, high hydrostatic pressure is widely used in bioscience and biotechnology for structurally perturbing macromolecules such as proteins and lipids or in food processing and sterilizing microbes. We suggest that hydrostatic pressure is an operative experimental parameter to screen yeast genes specifically for regulation of Tat2 through the function of Rsp5 ubiquitin ligase.

  11. 49 CFR 229.107 - Pressure gauge.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Safety Requirements Steam Generators § 229.107 Pressure gauge. (a) Each steam generator shall have an illuminated steam gauge that correctly... the allowed working pressure of the steam generator. (b) Each steam pressure gauge on a...

  12. 49 CFR 229.107 - Pressure gauge.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Safety Requirements Steam Generators § 229.107 Pressure gauge. (a) Each steam generator shall have an illuminated steam gauge that correctly... the allowed working pressure of the steam generator. (b) Each steam pressure gauge on a...

  13. Balancing Work and Family: A Panel Analysis of the Impact of Part-Time Work on the Experience of Time Pressure

    ERIC Educational Resources Information Center

    Laurijssen, Ilse; Glorieux, Ignace

    2013-01-01

    In this article we consider the consequences of work-family reconciliation, in terms of the extent to which the adjustment of the labour market career to family demands (by women) contributes to a better work-life balance. Using the Flemish SONAR-data, we analyse how changes in work and family conditions between the age of 26 and 29 are related to…

  14. Influence of working gas pressure on structure and properties of WO3 films reactively deposited by rf magnetron sputtering

    NASA Astrophysics Data System (ADS)

    Takahashi, T.; Tanabe, J.; Yamada, N.; Nakabayashi, H.

    2003-07-01

    Tungsten trioxide (WO3) films with thickness of 0.9-6.7 μm have been deposited on glass-slide substrates, using rf magnetron sputtering in an atmosphere of mixture 80% Ar and 20% O2. The as-deposited films had a dark metallic color, like the W target, at a working gas pressure PW of 1 mTorr. Yellow films resulted at a PW of 3 mTorr. With a further increase of PW, the film color changed to pale yellow. From the x-ray diffraction patterns, the as-deposited films were polycrystalline crystallizing in the monoclinic crystal structure with high c-axis orientation perpendicular to the film plane. The optical transmittance of the films deposited at a PW of 1 mTorr is nearly zero. However, the transmittance of the films deposited at other PW are larger than 70% in the wavelength, λ, ranging from 500 to 900 nm. With decreasing λ to 400 nm, the transmittance decreases steeply to zero. The λ at this absorption edge is longer than that in TiO2 and comes in the visible region. The surface morphology of the films depends on PW. This different morphology may be attributed to the effect of the substrate heating by plasma emission because of the high plasma density at higher PW. The morphology of the films may also depend on the crystallinity of the WO3 films. As PW increased, the surfaces of the films became rougher but the grain sizes of the films did not always become larger. The WO3 films deposited in this study may be used for the underlayer of TiO2 photocatalyst.

  15. Effect of dissolved oxygen content on stress corrosion cracking of a cold worked 316L stainless steel in simulated pressurized water reactor primary water environment

    NASA Astrophysics Data System (ADS)

    Zhang, Litao; Wang, Jianqiu

    2014-03-01

    Stress corrosion crack growth tests of a cold worked nuclear grade 316L stainless steel were conducted in simulated pressurized water reactor (PWR) primary water environment containing various dissolved oxygen (DO) contents but no dissolved hydrogen. The crack growth rate (CGR) increased with increasing DO content in the simulated PWR primary water. The fracture surface exhibited typical intergranular stress corrosion cracking (IGSCC) characteristics.

  16. Methodology and technology for peripheral and central blood pressure and blood pressure variability measurement: current status and future directions - Position statement of the European Society of Hypertension Working Group on blood pressure monitoring and cardiovascular variability.

    PubMed

    Stergiou, George S; Parati, Gianfranco; Vlachopoulos, Charalambos; Achimastos, Apostolos; Andreadis, Emanouel; Asmar, Roland; Avolio, Alberto; Benetos, Athanase; Bilo, Grzegorz; Boubouchairopoulou, Nadia; Boutouyrie, Pierre; Castiglioni, Paolo; de la Sierra, Alejandro; Dolan, Eamon; Head, Geoffrey; Imai, Yutaka; Kario, Kazuomi; Kollias, Anastasios; Kotsis, Vasilis; Manios, Efstathios; McManus, Richard; Mengden, Thomas; Mihailidou, Anastasia; Myers, Martin; Niiranen, Teemu; Ochoa, Juan Eugenio; Ohkubo, Takayoshi; Omboni, Stefano; Padfield, Paul; Palatini, Paolo; Papaioannou, Theodore; Protogerou, Athanasios; Redon, Josep; Verdecchia, Paolo; Wang, Jiguang; Zanchetti, Alberto; Mancia, Giuseppe; O'Brien, Eoin

    2016-09-01

    Office blood pressure measurement has been the basis for hypertension evaluation for almost a century. However, the evaluation of blood pressure out of the office using ambulatory or self-home monitoring is now strongly recommended for the accurate diagnosis in many, if not all, cases with suspected hypertension. Moreover, there is evidence that the variability of blood pressure might offer prognostic information that is independent of the average blood pressure level. Recently, advancement in technology has provided noninvasive evaluation of central (aortic) blood pressure, which might have attributes that are additive to the conventional brachial blood pressure measurement. This position statement, developed by international experts, deals with key research and practical issues in regard to peripheral blood pressure measurement (office, home, and ambulatory), blood pressure variability, and central blood pressure measurement. The objective is to present current achievements, identify gaps in knowledge and issues concerning clinical application, and present relevant research questions and directions to investigators and manufacturers for future research and development (primary goal). PMID:27214089

  17. The influence of working gas pressure on interlayer mixing in magnetron-deposited Mo/Si multilayers

    SciTech Connect

    Pershyn, Yuriy; Gullikson, Erik; Artyukov, Igor; Kondratenko, Valeriy; Sevryukova, Victoriya; Voronov, Dmitriy; Zubarev, Evgeniy; Vinogradov, Alexander

    2011-08-08

    Impact of Ar gas pressure (1-4 mTorr) on the growth of amorphous interlayers in Mo/Si multilayers deposited by magnetron sputtering was investigated by small-angle x-ray scattering ({lambda} = 0.154 nm) and methods of cross-sectional transmission electron microscopy. Some reduction of thickness of the amorphous inter-layers with Ar pressure increase was found, while composition of the layers was enriched with molybdenum. The interface modification resulted in raise of EUV reflectance of the Mo/Si multilayers.

  18. High pressure nitriding

    SciTech Connect

    Jung, M.; Hoffmann, F.T.; Mayr, P.; Minarski, P.

    1995-12-31

    The aim of the presented research project is the development of a new high pressure nitriding process, which avoids disadvantages of conventional nitriding processes and allows for new applications. Up to now, a nitriding furnace has been constructed and several investigations have been made in order to characterize the influence of pressure on the nitriding process. In this paper, connections between pressure in the range of 2 to 12 atm and the corresponding nitride layer formation for the steel grades AISI 1045, H11 and a nitriding steel are discussed. Results of the nitride layer formation are presented. For all steel grades, a growth of nitride layers with increasing pressure was obtained. Steels with passive layers, as the warm working steel H11, showed a better nitriding behavior at elevated pressure.

  19. Separating chokers from nonchokers: predicting real-life tennis performance under pressure from behavioral tasks that tap into working memory functioning.

    PubMed

    Bijleveld, Erik; Veling, Harm

    2014-08-01

    To better understand the characteristics of athletes who tend to underperform under pressure, we investigated how (a) working memory (WM) capacity and (b) responsiveness of the dopamine system shape real-life performance under pressure. We expected that athletes with smaller WM capacity or a more responsive dopamine system (as operationalized with a risk-taking measure) are especially prone to fail during decisive moments. In a sample of competitive tennis players, WM capacity was measured with the Automated Operation Span task (AOSPAN); responsiveness of the dopamine system was measured with a risk-taking measure, the Balloon Analogue Risk Task (BART). As expected, higher AOSPAN scores predicted better performance during decisive sets; higher BART scores predicted worse performance during decisive sets. These findings indicate that real-life tennis performance can be predicted from behavioral tasks that tap into WM functioning and risk taking, and suggest that the ability to effectively use WM despite pressure separates chokers from nonchokers. PMID:25226603

  20. Act No. 89-488 of 10 July 1989 containing provisions concerning agreements relating to insurance allowances for workers deprived of employment, the professional equality of women and men, labour and manpower examiners, foreign workers, and illicit work.

    PubMed

    1989-01-01

    Among other things, this French Act provides the following with respect to equality of opportunity in employment: 1) businesses with fewer than 300 workers may enter into agreements with the state permitting them to receive financial aid to carry out a study of their situation with respect to professional equality of women and men and measures that can be taken to restore equality of opportunity between women and men, such as temporary remedial plans that benefit only women; and 2) employers and workers' organizations are given 2 years to enter into collective bargaining to amend their contracts to remove all provisions that give special benefits to women, other than provisions establishing temporary remedial plans. The Act also strengthens the prohibitions on employing foreigners illegally in the following ways: 1) it provides that no person may directly or through another employ a foreigner without a work permit; 2) it makes it a crime, punishable by imprisonment for 2 months' to 2 years' and/or a fine of 2,000-200,000 francs for anyone other than an artist's agent to receive money, value, or personal property for bringing a foreign worker into France or arranging his or her hiring; 3) it raises the maximum penalty for using fraud or a false statement to obtain a work permit for a foreigner from 1 to 2 years' imprisonment for first offenders and from 3 to 4 years' imprisonment for repeat offenders; and 4) it raises penalties for lodging a foreigner illegally and for seeking from a foreign worker reimbursement for costs associated with bringing the worker to France and hiring him or her, or exacting from the worker a fee upon hiring. PMID:12344130

  1. A frictional work predictive method for the initiation of solid high explosives from low-pressure impacts

    SciTech Connect

    Chidester, S.K.; Green, L.G.; Lee, C.G.

    1993-07-01

    The goal of these tests was to provide information that would aid in the prediction of HE response in accident situations where the initiating stimulus was less than that required for direct shock initiation. Before these tests were run, a prediction of threshold impact velocity was made (70m/s) using a rough average of previously reported threshold factional work from skid tests (1 cal/cm{sub 2}) and the experimental value for coefficient of friction of 0.5({plus_minus}) measured in the same tests for PBX-9404. The actual testing proved the threshold impact velocity to be much less, and the pretest prediction was not only wrong, it was not conservative. This work presents a methodology for more accurately predicting the reaction threshold for HE involved in an accident such as an airplane crash or a severe land transportation accident. The main focus of this work is on LX-10-1 (94.5% 5.5% Viton A binder, density 1.86g/cm{sup 3}). Additional work was done on LX-17 (92.5% TATB, 7.5% KelF binder, density 1.90g/cm{sub 3}), a very insensitive explosive. The explicit two-dimensional finite element code, DYNA2D, was used to model the tests and predict the HE response. The finite element mesh of the projectile and target were generated using MAZE. The post-processing of the DYNA2D analysis was done with ORION.

  2. Control of work function of indium tin oxide: A surface treatment by atmospheric-pressure plasma layer on fabric-type electrodes

    NASA Astrophysics Data System (ADS)

    Ueda, Yoshihiko; Abe, Junichi; Murata, Hideyuki; Gotoh, Yasuhito; Sakai, Osamu

    2014-01-01

    The surface electronic properties of metal oxides, which affect the performances of layered electronic devices, are controlled by non-thermal atmospheric-pressure plasmas generated using a fabric-type electrode and gas flow induced through this plasma layer. We specify a method to control the work function of indium tin oxide (ITO) films by this plasma, in which such reactive species as oxidant radicals are generated. These oxidants are spatially transported in the gas flow to the ITO surface and increase the ITO’s work function, as verified in our experimental results. To examine the effects of the increased work function in a specific electronic device, we treat the surface of an ITO electrode in an organic light-emitting diode and observe the enhancement of the light-emitting efficiency.

  3. Understanding significant processes during work environment interventions to alleviate time pressure and associated sick leave of home care workers – a case study

    PubMed Central

    2013-01-01

    Background Ergonomic and work stress interventions rarely show long-term positive effect. The municipality participating in this study received orders from the Norwegian Labour Inspectorate due to an identified unhealthy level of time pressure, and responded by effectuating several work environment interventions. The study aim is to identify critical factors in the interaction between work environment interventions and independent rationalization measures in order to understand a potential negative interfering effect from concurrent rationalizations on a comprehensive work environment intervention. Methods The study, using a historic prospective mixed-method design, comprised 6 home care units in a municipality in Norway (138 respondents, response rate 76.2%; 17 informants). The study included quantitative estimations, register data of sick leave, a time line of significant events and changes, and qualitative descriptions of employee appraisals of their work situation gathered through semi-structured interviews and open survey responses. Results The work environment interventions were in general regarded as positive by the home care workers. However, all units were simultaneously subjected to substantial contextual instability, involving new work programs, new technology, restructurings, unit mergers, and management replacements, perceived by the home care workers to be major sources of stress. Findings suggest that concurrent changes induced through rationalization resulted in negative exposure effects that negated positive work environment intervention effects, causing an overall deteriorated work situation for the home care workers. Conclusions Establishment and active utilization of communication channels from workers to managers are recommended in order to increase awareness of putative harmful and interruptive effects of rationalization measures. PMID:24238560

  4. Effect of substrate roughness and working pressure on photocatalyst of N-doped TiOx films prepared by reactive sputtering with air

    NASA Astrophysics Data System (ADS)

    Lee, Seon-Hong; Yamasue, Eiji; Okumura, Hideyuki; Ishihara, Keiichi N.

    2015-01-01

    N-doped TiOx films on the glass substrate were prepared by radio-frequency (RF) magnetron reactive sputtering of Ti target in a mixed gas of argon and dry air. The effect of substrate roughness and working pressure on the physical properties and the photocatalytic properties of the N-doped TiOx films was investigated. The surface roughness of glass substrate has little influence on the film properties such as produced phases, lattice parameters, introduced nitrogen contents, and atomic bonding configurations, but significant influence on the surface roughness of film resulting in the variation of the photocatalytic ability. The working pressure has little influence on the produced phases and the atomic bonding configurations, but significant influence on the atomic concentration of the N-doped TiOx film, resulting in the large variation of optical, structural, and photocatalytic properties. It is suggested that the high photocatalysis of N-doped TiOx film requires a certain range of the N doping concentration which shows the interstitial complex N doping states in TiO2.

  5. Real time noninvasive estimation of work of breathing using facemask leak-corrected tidal volume during noninvasive pressure support: validation study.

    PubMed

    Banner, Michael J; Tams, Carl G; Euliano, Neil R; Stephan, Paul J; Leavitt, Trevor J; Martin, A Daniel; Al-Rawas, Nawar; Gabrielli, Andrea

    2016-06-01

    We describe a real time, noninvasive method of estimating work of breathing (esophageal balloon not required) during noninvasive pressure support (PS) that uses an artificial neural network (ANN) combined with a leak correction (LC) algorithm, programmed to ignore asynchronous breaths, that corrects for differences in inhaled and exhaled tidal volume (VT) from facemask leaks (WOBANN,LC/min). Validation studies of WOBANN,LC/min were performed. Using a dedicated and popular noninvasive ventilation ventilator (V60, Philips), in vitro studies using PS (5 and 10 cm H2O) at various inspiratory flow rate demands were simulated with a lung model. WOBANN,LC/min was compared with the actual work of breathing, determined under conditions of no facemask leaks and estimated using an ANN (WOBANN/min). Using the same ventilator, an in vivo study of healthy adults (n = 8) receiving combinations of PS (3-10 cm H2O) and expiratory positive airway pressure was done. WOBANN,LC/min was compared with physiologic work of breathing/min (WOBPHYS/min), determined from changes in esophageal pressure and VT applied to a Campbell diagram. For the in vitro studies, WOBANN,LC/min and WOBANN/min ranged from 2.4 to 11.9 J/min and there was an excellent relationship between WOBANN,LC/breath and WOBANN/breath, r = 0.99, r(2) = 0.98 (p < 0.01). There were essentially no differences between WOBANN,LC/min and WOBANN/min. For the in vivo study, WOBANN,LC/min and WOBPHYS/min ranged from 3 to 12 J/min and there was an excellent relationship between WOBANN,LC/breath and WOBPHYS/breath, r = 0.93, r(2) = 0.86 (p < 0.01). An ANN combined with a facemask LC algorithm provides noninvasive and valid estimates of work of breathing during noninvasive PS. WOBANN,LC/min, automatically and continuously estimated, may be useful for assessing inspiratory muscle loads and guiding noninvasive PS settings as in a decision support system to appropriately unload inspiratory muscles. PMID:26070542

  6. Blood Pressure, Sleep Quality and Fatigue in Shift Working Police Officers: Effects of a Twelve Hour Roster System on Cardiovascular and Sleep Health

    PubMed Central

    Elliott, Jaymen L.; Lal, Sara

    2016-01-01

    Background: Police officers have been reported to exhibit a high incidence of pathologies, which present prematurely in an otherwise healthy population. Shift work has also been associated with an increased risk of cardiovascular and sleep disorders, attributable to its propensity for circadian rhythm dysfunction. However, contention exists as to whether shift work has a direct effect upon blood pressure (BP) regulation. Methods: This cross-sectional study sought to determine changes in BP and associations with the overall sleep quality and fatigue in 206 general duties police officers (n = 140 males) of the New South Wales Police Force in Australia. The subjects’ BP was assessed before and after their twelve hour shift, during which time they also completed the Lifestyle Appraisal Questionnaire, Pittsburgh Sleep Quality Index (PSQI), Epworth Sleepiness Scale and Fatigue Severity Scale (FSS). Results: Poor sleep quality (PSQI) and fatigue severity (FSS) were found to predominate in the sample (69% and 51% respectively). Although there was no change in BP for male participants, female officers’ systolic blood pressure (SBP) was found to increase significantly across the shift (p < 0.001), but with no change found in females’ diastolic blood pressure (DBP). Finally, higher pre and post-shift SBP (r = −0.26, p = 0.001; r = −0.25, p = 0.001, respectively) and DBP (r = −0.26, p = 0.001; r = −0.26, p = 0.001, respectively) were significantly correlated with lower FSS scores after accounting for age, waist-hip ratio and lifestyle risk factors. Conclusions: Based on these preliminary findings, there was a significant increase in SBP of female police officers after shift work, while BP and fatigue levels in all police officers were strongly related. Moreover, the predominating poor sleep quality and impact of fatigue in this sample remain a concern. Further research is required to ensure the physiological welfare of police officers, while strategies must be

  7. Pressure Drop

    NASA Technical Reports Server (NTRS)

    Lawson, Mike

    2010-01-01

    Mike Lawson briefly discussed pressure drop for aerospace applications and presented short stories about adventures experienced while working at NASA and General Dynamics, including exposure to technologies like the Crew and Equipment Translation Aid (CETA) cart and the SWME.

  8. Attachment Fitting for Pressure Vessel

    NASA Technical Reports Server (NTRS)

    Smeltzer, Stanley S., III (Inventor); Carrigan, Robert W. (Inventor)

    2002-01-01

    This invention provides sealed access to the interior of a pressure vessel and consists of a tube. a collar, redundant seals, and a port. The port allows the seals to be pressurized and seated before the pressure vessel becomes pressurized.

  9. High blood pressure - infants

    MedlinePlus

    National High Blood Pressure Education Program Working Group on High Blood Pressure in Children and Adolescents. The fourth report on the diagnosis, evaluation, and treatment of high blood pressure in children and adolescents. Pediatrics . ...

  10. A new multiplex method for the diagnosis of peroxisomal disorders allowing simultaneous determination of plasma very-long-chain fatty acids, phytanic, pristanic, docosahexaenoic and bile acids by high-performance liquid chromatography-atmospheric pressure chemical ionization-tandem mass spectrometry.

    PubMed

    Semeraro, Michela; Rizzo, Cristiano; Boenzi, Sara; Cappa, Marco; Bertini, Enrico; Antonetti, Giacomo; Dionisi-Vici, Carlo

    2016-07-01

    Peroxisomal disorders (PDs) present with wide phenotypic variability. An appropriate diagnosis requires a complete analysis of peroxisomal metabolites. We developed a multiplex LC-MS/MS method, using atmospheric pressure chemical ionization allowing the simultaneous determination in plasma of very-long-chain fatty acids, phytanic, pristanic, docosahexaenoic acids and di- and tri-hydroxycolestanoic bile acids. Two hundred microliters of plasma extracted with acetonitrile and 200μl extracted with hexane after an acid hydrolysis were combined, evaporated, dissolved in 10μl of methanol and analyzed. The acquisition was in negative-ion mode using multiple reaction monitoring. The method was validated analytically and clinically. Linearity was 0.1-200μmol/l for docosanoic, cis-13-docosenoic, tetracosanoic, cis-15-tetracosenoic and phytanic acids; 0.01-10μmol/l for hexacosanoic acid; 0.02-20μmol/l for di-hydroxycolestanoic, tri-hydroxycolestanoic and pristanic acids; 0.3-300μmol/l for docosahexaenoic acid. Intra-day and inter-day CVs were below 3.88 and 3.98 respectively for all compounds. Samples from patients with known peroxisomal disorders were compared with controls and the method allowed to confirm the diagnosis in all subjects with a 100% sensitivity. The advantage of this multiplex method is to allow in a single chromatographic run the simultaneous determination of a large number of peroxisome biomarkers with a simple preparative phase without derivatization. PMID:27189059

  11. Blood Pressure Medicines

    MedlinePlus

    ... reducing sodium in your diet, you may need medicines. Blood pressure medicines work in different ways to lower blood pressure. ... and widen blood vessels. Often, two or more medicines work better than one. NIH: National Heart, Lung, ...

  12. Flange weld pressure testing

    NASA Technical Reports Server (NTRS)

    Holden, C. F.

    1977-01-01

    Device allows localized high-pressure proof test. Use of tool eliminates need to block off far end of pipe; only small amount of pressurizing gas is needed; only small area needs to be cleared of personnel for proof test.

  13. Vietnam recommended dietary allowances 2007.

    PubMed

    Khan, Nguyen Cong; Hoan, Pham Van

    2008-01-01

    It has been well acknowledged that Vietnam is undergoing a nutrition transition. With a rapid change in the country's reform and economic growth, food supply at the macronutrient level has improved. Changes of the Vietnamese diet include significantly more foods of animal origin, and an increase of fat/oils, and ripe fruits. Consequently, nutritional problems in Vietnam now include not only malnutrition but also overweight/obesity, metabolic syndrome and other chronic diseases related to nutrition and lifestyles. The recognition of these shifts, which is also associated with morbidity and mortality, was a major factor in the need to review and update the Recommended Dietary Allowances (RDA) for the Vietnamese population. This revised RDA established an important science-based tool for evaluation of nutrition adequacy, for teaching, and for scientific communications within Vietnam. It is expected that the 2007 Vietnam RDA and its conversion to food-based dietary guidelines will facilitate education to the public, as well as the policy implementation of programs for prevention of non-communicable chronic diseases and addressing the double burden of both under and over nutrition. PMID:18460440

  14. 29 CFR 778.600 - Veterans' subsistence allowances.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 3 2014-07-01 2014-07-01 false Veterans' subsistence allowances. 778.600 Section 778.600... Miscellaneous § 778.600 Veterans' subsistence allowances. Subsistence allowances paid under Public Law 346 (commonly known as the G.I. bill of rights) to a veteran employed in on-the-job training program work...

  15. 29 CFR 778.600 - Veterans' subsistence allowances.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 3 2013-07-01 2013-07-01 false Veterans' subsistence allowances. 778.600 Section 778.600... Miscellaneous § 778.600 Veterans' subsistence allowances. Subsistence allowances paid under Public Law 346 (commonly known as the G.I. bill of rights) to a veteran employed in on-the-job training program work...

  16. 29 CFR 778.600 - Veterans' subsistence allow- ances.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Veterans' subsistence allow- ances. 778.600 Section 778.600... Miscellaneous § 778.600 Veterans' subsistence allow- ances. Subsistence allowances paid under Public Law 346 (commonly known as the G.I. bill of rights) to a veteran employed in on-the-job training program work...

  17. 29 CFR 778.600 - Veterans' subsistence allowances.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 3 2012-07-01 2012-07-01 false Veterans' subsistence allowances. 778.600 Section 778.600... Miscellaneous § 778.600 Veterans' subsistence allowances. Subsistence allowances paid under Public Law 346 (commonly known as the G.I. bill of rights) to a veteran employed in on-the-job training program work...

  18. 29 CFR 778.600 - Veterans' subsistence allow- ances.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 3 2011-07-01 2011-07-01 false Veterans' subsistence allow- ances. 778.600 Section 778.600... Miscellaneous § 778.600 Veterans' subsistence allow- ances. Subsistence allowances paid under Public Law 346 (commonly known as the G.I. bill of rights) to a veteran employed in on-the-job training program work...

  19. 40 CFR 35.940-1 - Allowable project costs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Allowable project costs. 35.940-1 Section 35.940-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.940-1 Allowable project costs. Allowable...

  20. Central arterial pressure assessment with intensity POF sensor

    NASA Astrophysics Data System (ADS)

    Leitão, Cátia; Gonçalves, Steve; Antunes, Paulo; Bastos, José M.; Pinto, João. L.; André, Paulo

    2015-09-01

    The central pressure monitoring is considered a new key factor in hypertension assessment and cardiovascular prevention. In this work, it is presented the central arterial systolic pressure assessment with an intensity based POF sensor. The device was tested in four subjects, and stable pulse waves were obtained, allowing the calculation of the central pressure for all the subjects. The results shown that the sensor performs reliably, being a simple and low-cost solution to the intended application.

  1. Progress Report on Alloy 617 Time Dependent Allowables

    SciTech Connect

    Wright, Julie Knibloe

    2015-06-01

    Time dependent allowable stresses are required in the ASME Boiler and Pressure Vessel Code for design of components in the temperature range where time dependent deformation (i.e., creep) is expected to become significant. There are time dependent allowable stresses in Section IID of the Code for use in the non-nuclear construction codes, however, there are additional criteria that must be considered in developing time dependent allowables for nuclear components. These criteria are specified in Section III NH. St is defined as the lesser of three quantities: 100% of the average stress required to obtain a total (elastic, plastic, primary and secondary creep) strain of 1%; 67% of the minimum stress to cause rupture; and 80% of the minimum stress to cause the initiation of tertiary creep. The values are reported for a range of temperatures and for time increments up to 100,000 hours. These values are determined from uniaxial creep tests, which involve the elevated temperature application of a constant load which is relatively small, resulting in deformation over a long time period prior to rupture. The stress which is the minimum resulting from these criteria is the time dependent allowable stress St. In this report data from a large number of creep and creep-rupture tests on Alloy 617 are analyzed using the ASME Section III NH criteria. Data which are used in the analysis are from the ongoing DOE sponsored high temperature materials program, form Korea Atomic Energy Institute through the Generation IV VHTR Materials Program and historical data from previous HTR research and vendor data generated in developing the alloy. It is found that the tertiary creep criterion determines St at highest temperatures, while the stress to cause 1% total strain controls at low temperatures. The ASME Section III Working Group on Allowable Stress Criteria has recommended that the uncertainties associated with determining the onset of tertiary creep and the lack of significant

  2. Acoustic emission testing of 12-nickel maraging steel pressure vessels

    NASA Technical Reports Server (NTRS)

    Dunegan, H. L.

    1973-01-01

    Acoustic emission data were obtained from three point bend fracture toughness specimens of 12-nickel maraging steel, and two pressure vessels of the same material. One of the pressure vessels contained a prefabricated flaw which was extended and sharpened by fatigue cycling. It is shown that the flawed vessel had similar characteristics to the fracture specimens, thereby allowing estimates to be made of its nearness to failure during a proof test. Both the flawed and unflawed pressure vessel survived the proof pressure and 5 cycles to the working pressure, but it was apparent from the acoustic emission response during the proof cycle and the 5 cycles to the working pressure that the flawed vessel was very near failure. The flawed vessel did not survive a second cycle to the proof pressure before failure due to flaw extension through the wall (causing a leak).

  3. Carbon dioxide laser with an e-beam-initiated discharge produced in the working gas mixture at a pressure up to 5 atm

    SciTech Connect

    Orlovskii, Viktor M; Alekseev, S B; Tarasenko, Viktor F

    2011-11-30

    A high-pressure CO{sub 2} laser with a discharge initiated by an electron beam of sub-nanosecond duration in the laser gas mixture at a pressure up to 5 atm is fabricated. For the 20-ns pulses the energy from the active volume {approx} 4 cm{sup 3} amounted to 40 mJ. The laser operation at a pulse repetition rate up to 5 Hz is demonstrated. In the gas mixture CO{sub 2}:N{sub 2}:He = 1:1:6 at a pressure 5 atm, the specific energy deposition of {approx} 0.07 J cm{sup -3} atm{sup -1} is obtained in the process of a non-self-sustained discharge with ionisation amplification.

  4. 5 CFR 591.305 - Allowance rates.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Allowance rates. 591.305 Section 591.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS ALLOWANCES AND DIFFERENTIALS Allowance Based on Duty at Remote Worksites § 591.305 Allowance rates. (a) General. An allowance rate may not exceed $10 a day....

  5. Horizontal subsea trees allow frequent deepwater workovers

    SciTech Connect

    Krenek, M.; Hall, G.; Sheng, W.Z.

    1995-05-01

    Horizontal subsea wellheads have found application in the Liuhua oil field in the South China Sea. These trees allow installation and retrieval of downhole equipment through the tree without having to disturb the tree or its external connections to flow lines, service lines, or control umbilicals. This access to the well is important because the Liuhua wells will be produced with electrical submersible pumps (ESPs), which may have relatively short intervals between maintenance, leading to frequent well work. The wells will be completed subsea in about 300 m of water. The large bore, horizontal trees allow all downhole equipment to be pulled without removal of the subsea tree. This wellhead configuration also provides well control and vertical access to downhole equipment through a conventional marine drilling riser and subsea blowout preventer (BOP), eliminating the need for costly specialized completion risers. Another benefit of the horizontal tree is its extremely compact profile with a low number of valves for well control. Valve size and spacing are decoupled from the size and bore spacing of the tubing hanger. The tree`s low profile geometry reduces costs of manufacturing the tree and framework and optimize load transfer to the wellhead.

  6. Assessment Data at Your Fingertips: Advances Allow for Timely Reporting

    ERIC Educational Resources Information Center

    Bolch, Matt

    2009-01-01

    The ever-increasing standards of No Child Left Behind regulations and various state assessments have put more pressure on teachers and administrators to monitor the learning process. Fortunately, the advent of technology is allowing teachers to test more often to prepare students for high-stakes tests and for districts to understand results for…

  7. 46 CFR 54.25-5 - Corrosion allowance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Corrosion allowance. 54.25-5 Section 54.25-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS... must be as required in 46 CFR 54.01-35....

  8. 46 CFR 54.25-5 - Corrosion allowance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Corrosion allowance. 54.25-5 Section 54.25-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS... must be as required in 46 CFR 54.01-35....

  9. Is It Safe to Allow Cell Phones in School?

    ERIC Educational Resources Information Center

    Trump, Kenneth S.

    2009-01-01

    Cell phones were banned from most schools years ago, but after the Columbine High School and 9/11 tragedies, parents started pressuring some school boards and administrators to reverse the bans. On its surface, allowing students to have cell phones under the guise of improved school safety may seem like a "no-brainer" to many board members and…

  10. High-pressure creep tests

    NASA Technical Reports Server (NTRS)

    Bhattacharyya, S.; Lamoureux, J.; Hales, C.

    1986-01-01

    The automotive Stirling engine, presently being developed by the U.S. Department of Energy and NASA, uses high-pressure hydrogen as a working fluid; its long-term effects on the properties of alloys are relatively unknown. Hence, creep-rupture testing of wrought and cast high-temperature alloys in high-pressure hydrogen is an essential part of the research supporting the development of the Stirling cycle engine. Attention is given to the design, development, and operation of a 20 MPa hydrogen high-temperature multispecimen creep-rupture possessing high sensitivity. This pressure vessel allows for the simultaneous yet independent testing of six specimens. The results from one alloy, XF-818, are presented to illustrate how reported results are derived from the raw test data.

  11. Micro packaged MEMS pressure sensor for intracranial pressure measurement

    NASA Astrophysics Data System (ADS)

    Xiong, Liu; Yan, Yao; Jiahao, Ma; Yanhang, Zhang; Qian, Wang; Zhaohua, Zhang; Tianling, Ren

    2015-06-01

    This paper presents a micro packaged MEMS pressure sensor for intracranial pressure measurement which belongs to BioMEMS. It can be used in lumbar puncture surgery to measure intracranial pressure. Miniaturization is key for lumbar puncture surgery because the sensor must be small enough to allow it be placed in the reagent chamber of the lumbar puncture needle. The size of the sensor is decided by the size of the sensor chip and package. Our sensor chip is based on silicon piezoresistive effect and the size is 400 × 400 μm2. It is much smaller than the reported polymer intracranial pressure sensors such as liquid crystal polymer sensors. In terms of package, the traditional dual in-line package obviously could not match the size need, the minimal size of recently reported MEMS-based intracranial pressure sensors after packaging is 10 × 10 mm2. In this work, we are the first to introduce a quad flat no-lead package as the package form of piezoresistive intracranial pressure sensors, the whole size of the sensor is minimized to only 3 × 3 mm2. Considering the liquid measurement environment, the sensor is gummed and waterproof performance is tested; the sensitivity of the sensor is 0.9 × 10-2 mV/kPa. Project supported by the National Natural Science Foundation of China (Nos. 61025021, 61434001), and the ‘Thousands Talents’ Program for Pioneer Researchers and Its Innovation Team, China.

  12. Nonlinear lymphangion pressure-volume relationship minimizes edema.

    PubMed

    Venugopal, Arun M; Stewart, Randolph H; Laine, Glen A; Quick, Christopher M

    2010-09-01

    Lymphangions, the segments of lymphatic vessel between two valves, contract cyclically and actively pump, analogous to cardiac ventricles. Besides having a discernable systole and diastole, lymphangions have a relatively linear end-systolic pressure-volume relationship (with slope E(max)) and a nonlinear end-diastolic pressure-volume relationship (with slope E(min)). To counter increased microvascular filtration (causing increased lymphatic inlet pressure), lymphangions must respond to modest increases in transmural pressure by increasing pumping. To counter venous hypertension (causing increased lymphatic inlet and outlet pressures), lymphangions must respond to potentially large increases in transmural pressure by maintaining lymph flow. We therefore hypothesized that the nonlinear lymphangion pressure-volume relationship allows transition from a transmural pressure-dependent stroke volume to a transmural pressure-independent stroke volume as transmural pressure increases. To test this hypothesis, we applied a mathematical model based on the time-varying elastance concept typically applied to ventricles (the ratio of pressure to volume cycles periodically from a minimum, E(min), to a maximum, E(max)). This model predicted that lymphangions increase stroke volume and stroke work with transmural pressure if E(min) < E(max) at low transmural pressures, but maintain stroke volume and stroke work if E(min)= E(max) at higher transmural pressures. Furthermore, at higher transmural pressures, stroke work is evenly distributed among a chain of lymphangions. Model predictions were tested by comparison to previously reported data. Model predictions were consistent with reported lymphangion properties and pressure-flow relationships of entire lymphatic systems. The nonlinear lymphangion pressure-volume relationship therefore minimizes edema resulting from both increased microvascular filtration and venous hypertension. PMID:20601461

  13. 24 CFR 242.28 - Allowable costs for consultants.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... project development. Fees for work performed more than 2 years prior to application are not allowable... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Allowable costs for consultants. 242.28 Section 242.28 Housing and Urban Development Regulations Relating to Housing and...

  14. 24 CFR 242.28 - Allowable costs for consultants.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... project development. Fees for work performed more than 2 years prior to application are not allowable... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Allowable costs for consultants. 242.28 Section 242.28 Housing and Urban Development Regulations Relating to Housing and...

  15. 24 CFR 242.28 - Allowable costs for consultants.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... project development. Fees for work performed more than 2 years prior to application are not allowable... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Allowable costs for consultants. 242.28 Section 242.28 Housing and Urban Development Regulations Relating to Housing and...

  16. 24 CFR 242.28 - Allowable costs for consultants.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... project development. Fees for work performed more than 2 years prior to application are not allowable... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Allowable costs for consultants. 242.28 Section 242.28 Housing and Urban Development Regulations Relating to Housing and...

  17. 24 CFR 242.28 - Allowable costs for consultants.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... project development. Fees for work performed more than 2 years prior to application are not allowable... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Allowable costs for consultants. 242.28 Section 242.28 Housing and Urban Development Regulations Relating to Housing and...

  18. 40 CFR 35.2205 - Maximum allowable project cost.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Maximum allowable project cost. 35.2205 Section 35.2205 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2205 Maximum allowable project cost. (a) Grants awarded on...

  19. 46 CFR 154.421 - Allowable stress.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Allowable stress. 154.421 Section 154.421 Shipping COAST... § 154.421 Allowable stress. The allowable stress for the integral tank structure must meet the American Bureau of Shipping's allowable stress for the vessel's hull published in “Rules for Building and...

  20. 46 CFR 154.421 - Allowable stress.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Allowable stress. 154.421 Section 154.421 Shipping COAST... § 154.421 Allowable stress. The allowable stress for the integral tank structure must meet the American Bureau of Shipping's allowable stress for the vessel's hull published in “Rules for Building and...

  1. 46 CFR 154.421 - Allowable stress.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Allowable stress. 154.421 Section 154.421 Shipping COAST... § 154.421 Allowable stress. The allowable stress for the integral tank structure must meet the American Bureau of Shipping's allowable stress for the vessel's hull published in “Rules for Building and...

  2. 46 CFR 154.421 - Allowable stress.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Allowable stress. 154.421 Section 154.421 Shipping COAST... § 154.421 Allowable stress. The allowable stress for the integral tank structure must meet the American Bureau of Shipping's allowable stress for the vessel's hull published in “Rules for Building and...

  3. 46 CFR 154.421 - Allowable stress.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Allowable stress. 154.421 Section 154.421 Shipping COAST... § 154.421 Allowable stress. The allowable stress for the integral tank structure must meet the American Bureau of Shipping's allowable stress for the vessel's hull published in “Rules for Building and...

  4. 46 CFR 154.440 - Allowable stress.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Allowable stress. 154.440 Section 154.440 Shipping COAST... Tank Type A § 154.440 Allowable stress. (a) The allowable stresses for an independent tank type A must... Commandant (CG-522). (b) A greater allowable stress than required in paragraph (a)(1) of this section may...

  5. Experimental Rate Study of Vitrinite Maturation as a Function of Temperature, Time, Starting Material, Aqueous Fluid Pressure, and Oxygen Fugacity: Corroboration of Prior Work

    NASA Astrophysics Data System (ADS)

    Ernst, W. G.; Mählmann, R. F.

    2002-05-01

    Kinetic studies were performed on disaggregated samples of gymnosperm and angiosperm huminite at 2.0 kbar aqueous fluid pressure and oxygen fugacities defined by hematite-magnetite and magnetite + quartz-fayalite solid buffers. Individual experiments lasted from 5-204 days. The rate of vitrinite reflectance (VR) increase was evaluated at 200, 250, 300, and 400oC isotherms; experimentally determined, approximately steady-state values for the mean percentage Rmax are 0.54, 0.74, 1.10, and 2.25, respectively. The overall activation energy governing the kinetics of several devolatilization reactions responsible for increase in VR measured in our experiments is 21.8+/- 0.3 kJ/mol. Combined with earlier rate studies conducted by Dalla Torre et al. (1997), we conclude that the rate of vitrinite maturation is unaffected by oxidation state, "wet" versus "dry" conditions, and the nature of the starting lignitic material. To a small extent, elevated lithostatic pressure retards the rate of increase in VR. These new run data demonstrate that VR is chiefly a function of temperature and time. In support of most earlier field, theoretical, and laboratory studies, our research indicates that, for all but geologically insignificant times intervals, vitrinite reflectance is an appropriate proxy for host-rock burial temperature.

  6. 38 CFR 3.810 - Clothing allowance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... clothing allowance; multiple types of garments affected. A veteran is entitled to an annual clothing...) Two clothing allowances; single type of garment affected. A veteran is entitled to two annual...

  7. 38 CFR 3.810 - Clothing allowance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... clothing allowance; multiple types of garments affected. A veteran is entitled to an annual clothing...) Two clothing allowances; single type of garment affected. A veteran is entitled to two annual...

  8. 38 CFR 3.810 - Clothing allowance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... clothing allowance; multiple types of garments affected. A veteran is entitled to an annual clothing...) Two clothing allowances; single type of garment affected. A veteran is entitled to two annual...

  9. 45 CFR 1157.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... named in OBM Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and... 45 Public Welfare 3 2010-10-01 2010-10-01 false Allowable costs. 1157.22 Section 1157.22 Public... Allowable costs. (a) Limitation on use of funds. Grant funds may be used only for: (1) The allowable...

  10. 50 CFR 85.41 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... applicable Federal cost principles in 43 CFR 12.60(b). Purchase of informational signs, program signs, and... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Allowable costs. 85.41 Section 85.41... Use/Acceptance of Funds § 85.41 Allowable costs. (a) Allowable grant costs are limited to those...

  11. 34 CFR 304.21 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Grantee § 304.21 Allowable costs. In addition to the allowable costs established in the Education Department General Administrative Regulations in 34 CFR 75.530 through 75.562, the following items are... 34 Education 2 2010-07-01 2010-07-01 false Allowable costs. 304.21 Section 304.21...

  12. 45 CFR 1180.56 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Allowable costs. 1180.56 Section 1180.56 Public... by a Grantee General Administrative Responsibilities § 1180.56 Allowable costs. (a) Determination of costs allowable under a grant is made in accordance with government-wide cost principles in...

  13. 42 CFR 417.534 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Allowable costs. 417.534 Section 417.534 Public... PLANS Medicare Payment: Cost Basis § 417.534 Allowable costs. (a) Definition—Allowable costs means the direct and indirect costs, including normal standby costs incurred by the HMO or CMP, that are proper...

  14. 42 CFR 417.802 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Allowable costs. 417.802 Section 417.802 Public... PLANS Health Care Prepayment Plans § 417.802 Allowable costs. (a) General rule. The costs that are considered allowable for HCPP reimbursement are the same as those for reasonable cost HMOs and CMPs...

  15. 32 CFR 34.17 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... organizations, is to be determined in accordance with: (1) The for-profit cost principles in 48 CFR parts 31 and.... (3) Hospitals. Allowability is determined in accordance with the provisions of 45 CFR part 74... Financial and Program Management § 34.17 Allowable costs. Allowability of costs shall be determined...

  16. 44 CFR 206.228 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Allowable costs. General policies for determining allowable costs are established in 44 CFR 13.22. Exceptions to those policies as allowed in 44 CFR 13.4 and 13.6 are explained below. (a) Eligible direct... costs for major disasters and emergencies will be paid in accordance with 44 CFR part 207. (b)...

  17. 32 CFR 34.17 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... organizations, is to be determined in accordance with: (1) The for-profit cost principles in 48 CFR parts 31 and.... (3) Hospitals. Allowability is determined in accordance with the provisions of 45 CFR part 74... Financial and Program Management § 34.17 Allowable costs. Allowability of costs shall be determined...

  18. 44 CFR 206.439 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Allowable costs. (a) General requirements for determining allowable costs are established in 44 CFR 13.22. Exceptions to those requirements as allowed in 44 CFR 13.4 and 13.6 are explained in paragraph (b) of this... CFR part 207. (c) Pre-award costs. FEMA may fund eligible pre-award planning or project costs at...

  19. 44 CFR 206.439 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Allowable costs. (a) General requirements for determining allowable costs are established in 44 CFR 13.22. Exceptions to those requirements as allowed in 44 CFR 13.4 and 13.6 are explained in paragraph (b) of this... CFR part 207. (c) Pre-award costs. FEMA may fund eligible pre-award planning or project costs at...

  20. 44 CFR 206.228 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Allowable costs. General policies for determining allowable costs are established in 44 CFR 13.22. Exceptions to those policies as allowed in 44 CFR 13.4 and 13.6 are explained below. (a) Eligible direct... costs for major disasters and emergencies will be paid in accordance with 44 CFR part 207. (b)...

  1. 44 CFR 204.63 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....63 Allowable costs. 44 CFR 13.22 establishes general policies for determining allowable costs. (a) We will reimburse direct costs for the administration of a fire management assistance grant under 44 CFR... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Allowable costs....

  2. 44 CFR 204.63 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....63 Allowable costs. 44 CFR 13.22 establishes general policies for determining allowable costs. (a) We will reimburse direct costs for the administration of a fire management assistance grant under 44 CFR... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Allowable costs....

  3. 46 CFR 154.447 - Allowable stress.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Allowable stress. 154.447 Section 154.447 Shipping COAST... Tank Type B § 154.447 Allowable stress. (a) An independent tank type B designed from bodies of revolution must have allowable stresses 3 determined by the following formulae: 3 See Appendix B for...

  4. 46 CFR 154.428 - Allowable stress.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Allowable stress. 154.428 Section 154.428 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY STANDARDS FOR... § 154.428 Allowable stress. The membrane tank and the supporting insulation must have allowable...

  5. 20 CFR 632.258 - Allowable activities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Allowable activities. 632.258 Section 632.258 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.258 Allowable activities. Allowable activities are...

  6. 34 CFR 80.22 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CFR part 31. Contract Cost Principles and Procedures, or uniform cost accounting standards that comply... 34 Education 1 2013-07-01 2013-07-01 false Allowable costs. 80.22 Section 80.22 Education Office... Allowable costs. (a) Limitation on use of funds. Grant funds may be used only for: (1) The allowable...

  7. 34 CFR 80.22 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CFR part 31. Contract Cost Principles and Procedures, or uniform cost accounting standards that comply... 34 Education 1 2014-07-01 2014-07-01 false Allowable costs. 80.22 Section 80.22 Education Office... Allowable costs. (a) Limitation on use of funds. Grant funds may be used only for: (1) The allowable...

  8. 42 CFR 417.534 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 3 2012-10-01 2012-10-01 false Allowable costs. 417.534 Section 417.534 Public... PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.534 Allowable costs. (a) Definition—Allowable costs means the direct and indirect costs, including normal standby costs incurred by the HMO or CMP, that...

  9. 34 CFR 80.22 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CFR part 31. Contract Cost Principles and Procedures, or uniform cost accounting standards that comply... 34 Education 1 2011-07-01 2011-07-01 false Allowable costs. 80.22 Section 80.22 Education Office... Allowable costs. (a) Limitation on use of funds. Grant funds may be used only for: (1) The allowable...

  10. 34 CFR 304.21 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Grantee § 304.21 Allowable costs. In addition to the allowable costs established in the Education Department General Administrative Regulations in 34 CFR 75.530 through 75.562, the following items are... 34 Education 2 2012-07-01 2012-07-01 false Allowable costs. 304.21 Section 304.21...

  11. 34 CFR 675.33 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false Allowable costs. 675.33 Section 675.33 Education... costs. (a)(1) Allowable and unallowable costs. Except as provided in paragraph (a)(2) of this section, costs reasonably related to carrying out the programs described in § 675.32 are allowable. (2)...

  12. 34 CFR 675.33 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false Allowable costs. 675.33 Section 675.33 Education... costs. (a)(1) Allowable and unallowable costs. Except as provided in paragraph (a)(2) of this section, costs reasonably related to carrying out the programs described in § 675.32 are allowable. (2)...

  13. 45 CFR 1157.22 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... named in OBM Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and... 45 Public Welfare 3 2013-10-01 2013-10-01 false Allowable costs. 1157.22 Section 1157.22 Public... Allowable costs. (a) Limitation on use of funds. Grant funds may be used only for: (1) The allowable...

  14. 34 CFR 304.21 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Grantee § 304.21 Allowable costs. In addition to the allowable costs established in the Education Department General Administrative Regulations in 34 CFR 75.530 through 75.562, the following items are... 34 Education 2 2011-07-01 2010-07-01 true Allowable costs. 304.21 Section 304.21...

  15. 46 CFR 154.447 - Allowable stress.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Allowable stress. 154.447 Section 154.447 Shipping COAST... Tank Type B § 154.447 Allowable stress. (a) An independent tank type B designed from bodies of revolution must have allowable stresses 3 determined by the following formulae: 3 See Appendix B for...

  16. 46 CFR 154.447 - Allowable stress.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Allowable stress. 154.447 Section 154.447 Shipping COAST... Tank Type B § 154.447 Allowable stress. (a) An independent tank type B designed from bodies of revolution must have allowable stresses 3 determined by the following formulae: 3 See Appendix B for...

  17. 46 CFR 154.447 - Allowable stress.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Allowable stress. 154.447 Section 154.447 Shipping COAST... Tank Type B § 154.447 Allowable stress. (a) An independent tank type B designed from bodies of revolution must have allowable stresses 3 determined by the following formulae: 3 See Appendix B for...

  18. 46 CFR 154.428 - Allowable stress.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Allowable stress. 154.428 Section 154.428 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY STANDARDS FOR... § 154.428 Allowable stress. The membrane tank and the supporting insulation must have allowable...

  19. 46 CFR 154.428 - Allowable stress.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Allowable stress. 154.428 Section 154.428 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY STANDARDS FOR... § 154.428 Allowable stress. The membrane tank and the supporting insulation must have allowable...

  20. 46 CFR 154.428 - Allowable stress.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Allowable stress. 154.428 Section 154.428 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY STANDARDS FOR... § 154.428 Allowable stress. The membrane tank and the supporting insulation must have allowable...

  1. 20 CFR 211.8 - Displacement allowance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 1 2013-04-01 2012-04-01 true Displacement allowance. 211.8 Section 211.8 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD RETIREMENT ACT CREDITABLE RAILROAD COMPENSATION § 211.8 Displacement allowance. An allowance paid to an employee because he has...

  2. 20 CFR 211.8 - Displacement allowance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Displacement allowance. 211.8 Section 211.8 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD RETIREMENT ACT CREDITABLE RAILROAD COMPENSATION § 211.8 Displacement allowance. An allowance paid to an employee because he has...

  3. 20 CFR 211.8 - Displacement allowance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 1 2014-04-01 2012-04-01 true Displacement allowance. 211.8 Section 211.8 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD RETIREMENT ACT CREDITABLE RAILROAD COMPENSATION § 211.8 Displacement allowance. An allowance paid to an employee because he has...

  4. 20 CFR 211.8 - Displacement allowance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 1 2011-04-01 2011-04-01 false Displacement allowance. 211.8 Section 211.8 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD RETIREMENT ACT CREDITABLE RAILROAD COMPENSATION § 211.8 Displacement allowance. An allowance paid to an employee because he has...

  5. 20 CFR 211.8 - Displacement allowance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 1 2012-04-01 2012-04-01 false Displacement allowance. 211.8 Section 211.8 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD RETIREMENT ACT CREDITABLE RAILROAD COMPENSATION § 211.8 Displacement allowance. An allowance paid to an employee because he has...

  6. 44 CFR 204.63 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....63 Allowable costs. 44 CFR 13.22 establishes general policies for determining allowable costs. (a) We will reimburse direct costs for the administration of a fire management assistance grant under 44 CFR... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Allowable costs....

  7. 44 CFR 206.228 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Allowable costs. General policies for determining allowable costs are established in 44 CFR 13.22. Exceptions to those policies as allowed in 44 CFR 13.4 and 13.6 are explained below. (a) Eligible direct... accordance with 44 CFR part 207. (b)...

  8. 44 CFR 206.439 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Allowable costs. (a) General requirements for determining allowable costs are established in 44 CFR 13.22. Exceptions to those requirements as allowed in 44 CFR 13.4 and 13.6 are explained in paragraph (b) of this... CFR part 207. (c) Pre-award costs. FEMA may fund eligible pre-award planning or project costs at...

  9. 44 CFR 204.63 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....63 Allowable costs. 44 CFR 13.22 establishes general policies for determining allowable costs. (a) We will reimburse direct costs for the administration of a fire management assistance grant under 44 CFR... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Allowable costs....

  10. 44 CFR 206.228 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Allowable costs. General policies for determining allowable costs are established in 44 CFR 13.22. Exceptions to those policies as allowed in 44 CFR 13.4 and 13.6 are explained below. (a) Eligible direct... costs for major disasters and emergencies will be paid in accordance with 44 CFR part 207. (b)...

  11. 44 CFR 206.439 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Allowable costs. (a) General requirements for determining allowable costs are established in 44 CFR 13.22. Exceptions to those requirements as allowed in 44 CFR 13.4 and 13.6 are explained in paragraph (b) of this... CFR part 207. (c) Pre-award costs. FEMA may fund eligible pre-award planning or project costs at...

  12. 44 CFR 204.63 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....63 Allowable costs. 44 CFR 13.22 establishes general policies for determining allowable costs. (a) We will reimburse direct costs for the administration of a fire management assistance grant under 44 CFR... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Allowable costs....

  13. 44 CFR 206.439 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Allowable costs. (a) General requirements for determining allowable costs are established in 44 CFR 13.22. Exceptions to those requirements as allowed in 44 CFR 13.4 and 13.6 are explained in paragraph (b) of this... CFR part 207. (c) Pre-award costs. FEMA may fund eligible pre-award planning or project costs at...

  14. 46 CFR 154.428 - Allowable stress.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Allowable stress. 154.428 Section 154.428 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SAFETY STANDARDS FOR... § 154.428 Allowable stress. The membrane tank and the supporting insulation must have allowable...

  15. 46 CFR 154.447 - Allowable stress.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Allowable stress. 154.447 Section 154.447 Shipping COAST... Tank Type B § 154.447 Allowable stress. (a) An independent tank type B designed from bodies of revolution must have allowable stresses 3 determined by the following formulae: 3 See Appendix B for...

  16. 44 CFR 206.228 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Allowable costs. General policies for determining allowable costs are established in 44 CFR 13.22. Exceptions to those policies as allowed in 44 CFR 13.4 and 13.6 are explained below. (a) Eligible direct... accordance with 44 CFR part 207. (b)...

  17. Power spectral density analysis of the electromyogram from a work task performed in a full pressure suit. Ph.D. Thesis - Houston Univ.; [for determining muscular fatigue

    NASA Technical Reports Server (NTRS)

    Lafevers, E. V.

    1974-01-01

    Surface electromyograms (EMG) taken from three upper torso muscles during a push-pull task were analyzed by a power spectral density technique to determine the utility of the spectral analysis for identifying changes in the EMG caused by muscular fatigue. The results confirmed the value of the frequency analysis for identifying fatigue producing muscular performance. Data revealed reliable differences between muscles in fatigue induced responses to various locations in the reach envelope at which the subjects were required to perform the push-pull exercise, and the differential sensitivity of individual muscles to the various reach positions; i.e., certain reach positions imposed more fatigue related shifts in EMG power than did others. It was found that a pressurized space suit changed the pattern of normal shirtsleeve muscle fatigue responses in all three of the muscles.

  18. Laboratory study of vitrinite maturation rate as a function of temperature, time, starting material, aqueous fluid pressure, and oxygen fugacity — corroboration of prior work

    NASA Astrophysics Data System (ADS)

    Ferreiro Mählmann, R.; Ernst, W. G.

    2003-04-01

    Kinetic investigations were performed on disaggregated samples of angiosperm and gymnosperm xylite (mainly pure huminite fragments) at 2.0 kbar aqueous fluid pressure and oxygen fugacities defined by hematite-magnetite and magnetite + quartz-fayalite buffers. Individual experiments lasted from 5 to 204 days. The rates of vitrinite reflectance (VR) increase were evaluated at 200, 250, 300, and 400 ^oC isotherms; experimentally determined, approximately steady-state values for the mean %R_r are 0.54, 0.74, 1.10, and 2.25, respectively. For geological lengths of time, appropriate values of %R_r = K_0t0.076 (where K_0 is a function of temperature, and t is in days). The overall activation energy describing the kinetics of devolatilization reactions responsible for increase in VR measured in our experiments is 21.8 ± 0.3 kJ/mol. Combined with earlier rate studies conducted by Dalla Torre et al. (1997) we conclude that the rate of vitrinite maturation is virtually unaffected by oxidation state, "wet" versus "dry" conditions, and nature of the starting lignitic material (conifers, hardwood). To a small extent, elevated lithostatic pressure retards the rate of increase in VR. Different, nonsystematic trends are observed for the resinite-exudatinite-bituminite present in the lignite material and in low temperature and short runs. Strong disequilibrium was recognized in short runs of the 200 and 250 ^oC isotherms. These new run data demonstrate that VR is chiefly a function of temperature and time. In support of earlier field, theoretical, and laboratory studies, for all but geologically insignificant time intervals, vitrinite reflectance is an appropriate proxy for host-rock burial temperature. Reference: Dalla Torre, M., Ferreiro Mählmann, R. and Ernst, W.G. (1997): Geochimica Cosmochimica Acta, 61/14, 2921-2928.

  19. Working during cancer treatment

    MedlinePlus

    ... people find that working through treatment is too difficult. Taking time off from work might be the best thing you can do for your health and your job. If your work performance is suffering, taking time off will allow your ...

  20. Z method calculations to determine the melting curve of silica at high pressures

    NASA Astrophysics Data System (ADS)

    González-Cataldo, F.; Davis, S.; Gutiérrez, G.

    2016-05-01

    The Z method is a novel technique that allows to calculate the melting temperature of materials at different pressures from the microcanonical ensemble. In this work, we apply this method to study the melting behavior of silica at high pressures, determining melting temperatures and dynamical properties.

  1. Pressure cryocooling protein crystals

    DOEpatents

    Kim, Chae Un; Gruner, Sol M.

    2011-10-04

    Preparation of cryocooled protein crystal is provided by use of helium pressurizing and cryocooling to obtain cryocooled protein crystal allowing collection of high resolution data and by heavier noble gas (krypton or xenon) binding followed by helium pressurizing and cryocooling to obtain cryocooled protein crystal for collection of high resolution data and SAD phasing simultaneously. The helium pressurizing is carried out on crystal coated to prevent dehydration or on crystal grown in aqueous solution in a capillary.

  2. Pressure versus drag effects on crater size

    NASA Technical Reports Server (NTRS)

    Schmidt, R. M.

    1993-01-01

    The topic of atmospheric effects on crater formation is very complex because it includes not only pressure effects on excavation, but also drag effects on ejecta placement. Experiments have to be designed very carefully to allow isolation of the two phenomena. Historically, numerous investigators have shown an influence of atmospheric pressure. However, none have identified the scaling that correctly isolates pressure from drag effects. On-going work in explosive cratering has produced scaling paradigms for deeply buried explosive charges where drag effects are negligible. Here it was found that increased pressure caused significant induced strength effects that impeded crater excavation. The effect is more pronounced with increasing burial depth and less pronounced with increased yield.

  3. An Empirical Comparison of Joint and Stratified Frameworks for Studying G × E Interactions: Systolic Blood Pressure and Smoking in the CHARGE Gene-Lifestyle Interactions Working Group.

    PubMed

    Sung, Yun Ju; Winkler, Thomas W; Manning, Alisa K; Aschard, Hugues; Gudnason, Vilmundur; Harris, Tamara B; Smith, Albert V; Boerwinkle, Eric; Brown, Michael R; Morrison, Alanna C; Fornage, Myriam; Lin, Li-An; Richard, Melissa; Bartz, Traci M; Psaty, Bruce M; Hayward, Caroline; Polasek, Ozren; Marten, Jonathan; Rudan, Igor; Feitosa, Mary F; Kraja, Aldi T; Province, Michael A; Deng, Xuan; Fisher, Virginia A; Zhou, Yanhua; Bielak, Lawrence F; Smith, Jennifer; Huffman, Jennifer E; Padmanabhan, Sandosh; Smith, Blair H; Ding, Jingzhong; Liu, Yongmei; Lohman, Kurt; Bouchard, Claude; Rankinen, Tuomo; Rice, Treva K; Arnett, Donna; Schwander, Karen; Guo, Xiuqing; Palmas, Walter; Rotter, Jerome I; Alfred, Tamuno; Bottinger, Erwin P; Loos, Ruth J F; Amin, Najaf; Franco, Oscar H; van Duijn, Cornelia M; Vojinovic, Dina; Chasman, Daniel I; Ridker, Paul M; Rose, Lynda M; Kardia, Sharon; Zhu, Xiaofeng; Rice, Kenneth; Borecki, Ingrid B; Rao, Dabeeru C; Gauderman, W James; Cupples, L Adrienne

    2016-07-01

    Studying gene-environment (G × E) interactions is important, as they extend our knowledge of the genetic architecture of complex traits and may help to identify novel variants not detected via analysis of main effects alone. The main statistical framework for studying G × E interactions uses a single regression model that includes both the genetic main and G × E interaction effects (the "joint" framework). The alternative "stratified" framework combines results from genetic main-effect analyses carried out separately within the exposed and unexposed groups. Although there have been several investigations using theory and simulation, an empirical comparison of the two frameworks is lacking. Here, we compare the two frameworks using results from genome-wide association studies of systolic blood pressure for 3.2 million low frequency and 6.5 million common variants across 20 cohorts of European ancestry, comprising 79,731 individuals. Our cohorts have sample sizes ranging from 456 to 22,983 and include both family-based and population-based samples. In cohort-specific analyses, the two frameworks provided similar inference for population-based cohorts. The agreement was reduced for family-based cohorts. In meta-analyses, agreement between the two frameworks was less than that observed in cohort-specific analyses, despite the increased sample size. In meta-analyses, agreement depended on (1) the minor allele frequency, (2) inclusion of family-based cohorts in meta-analysis, and (3) filtering scheme. The stratified framework appears to approximate the joint framework well only for common variants in population-based cohorts. We conclude that the joint framework is the preferred approach and should be used to control false positives when dealing with low-frequency variants and/or family-based cohorts. PMID:27230302

  4. 14 CFR 1273.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CFR part 31, Contract Cost Principles and Procedures, or uniform cost accounting standards that comply...) The allowable costs of the grantees, subgrantees and cost-type contractors, including allowable costs in the form of payments to fixed-price contractors; and (2) Reasonable fees or profit to...

  5. 28 CFR 66.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... than a hospital and an organization named in OBM Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or uniform cost accounting standards that comply with... allowable costs of the grantees, subgrantees and cost-type contractors, including allowable costs in...

  6. 27 CFR 28.334 - Credit allowance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Credit allowance. 28.334... OF THE TREASURY LIQUORS EXPORTATION OF ALCOHOL Action on Claims § 28.334 Credit allowance. Where the credit relates to internal revenue taxes on beer that have been determined but not yet paid by...

  7. 27 CFR 28.334 - Credit allowance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2011-04-01 2011-04-01 false Credit allowance. 28.334... OF THE TREASURY LIQUORS EXPORTATION OF ALCOHOL Action on Claims § 28.334 Credit allowance. Where the credit relates to internal revenue taxes on beer that have been determined but not yet paid by...

  8. 27 CFR 28.334 - Credit allowance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2012-04-01 2012-04-01 false Credit allowance. 28.334... OF THE TREASURY LIQUORS EXPORTATION OF ALCOHOL Action on Claims § 28.334 Credit allowance. Where the credit relates to internal revenue taxes on beer that have been determined but not yet paid by...

  9. 27 CFR 28.334 - Credit allowance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2014-04-01 2014-04-01 false Credit allowance. 28.334... OF THE TREASURY ALCOHOL EXPORTATION OF ALCOHOL Action on Claims § 28.334 Credit allowance. Where the credit relates to internal revenue taxes on beer that have been determined but not yet paid by...

  10. 27 CFR 28.334 - Credit allowance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2013-04-01 2013-04-01 false Credit allowance. 28.334... OF THE TREASURY ALCOHOL EXPORTATION OF ALCOHOL Action on Claims § 28.334 Credit allowance. Where the credit relates to internal revenue taxes on beer that have been determined but not yet paid by...

  11. Allocation of Allowances and Associated Family Practices.

    ERIC Educational Resources Information Center

    Kerr, M. Kaye; Cheadle, Tannis

    This study gathered information on general family practices concerning allowances given to children, parental reasons for the provision of allowances, the bases for their administration, and the frequency of conflicts generated around them. The subjects were 81 parents of elementary school children in a midwest Canadian city. Subjects completed…

  12. 45 CFR 1174.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... than a hospital and an organization named in OBM Circular A-122 as not subject to that circular 48 CFR... 45 Public Welfare 3 2010-10-01 2010-10-01 false Allowable costs. 1174.22 Section 1174.22 Public....22 Allowable costs. (a) Limitation on use of funds. Grant funds may be used only for: (1)...

  13. 29 CFR 1470.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or uniform cost accounting... 29 Labor 4 2010-07-01 2010-07-01 false Allowable costs. 1470.22 Section 1470.22 Labor Regulations... Financial Administration § 1470.22 Allowable costs. (a) Limitation on use of funds. Grant funds may be...

  14. 45 CFR 602.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CFR part 31. Contract Cost Principles and Procedures, or uniform cost accounting standards that comply... 45 Public Welfare 3 2010-10-01 2010-10-01 false Allowable costs. 602.22 Section 602.22 Public... Requirements § 602.22 Allowable costs. (a) Limitation on use of funds. Grant funds may be used only for:...

  15. 2 CFR 215.27 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CFR part 230, “Cost Principles for Non-Profit Organizations (OMB Circular A-122).” The allowability of... CFR part 220, “Cost Principles for Educational Institutions (OMB Circular A-21).” The allowability of costs incurred by hospitals is determined in accordance with the provisions of appendix E of 45 CFR...

  16. 45 CFR 2541.220 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... not subject to that circular 48 CFR Part 31. Contract Cost Principles and Procedures, or uniform cost... 45 Public Welfare 4 2010-10-01 2010-10-01 false Allowable costs. 2541.220 Section 2541.220 Public... Post-Award Requirements § 2541.220 Allowable costs. (a) Limitation on use of funds. Grant funds may...

  17. 45 CFR 1183.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... than a hospital and an organization named in OBM Circular A-122 as not subject to that circular 48 CFR... 45 Public Welfare 3 2010-10-01 2010-10-01 false Allowable costs. 1183.22 Section 1183.22 Public....22 Allowable costs. (a) Limitation on use of funds. Grant funds may be used only for: (1)...

  18. 24 CFR 85.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Allowable costs. 85.22 Section 85... TRIBAL GOVERNMENTS Post-Award Requirements Financial Administration § 85.22 Allowable costs....

  19. 42 CFR 417.802 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) MEDICARE PROGRAM HEALTH MAINTENANCE ORGANIZATIONS, COMPETITIVE MEDICAL PLANS, AND HEALTH CARE PREPAYMENT PLANS Health Care Prepayment Plans § 417.802 Allowable costs. (a) General rule. The costs that are... 42 Public Health 3 2011-10-01 2011-10-01 false Allowable costs. 417.802 Section 417.802...

  20. 42 CFR 417.802 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) MEDICARE PROGRAM (CONTINUED) HEALTH MAINTENANCE ORGANIZATIONS, COMPETITIVE MEDICAL PLANS, AND HEALTH CARE PREPAYMENT PLANS Health Care Prepayment Plans § 417.802 Allowable costs. (a) General rule. The costs that are... 42 Public Health 3 2014-10-01 2014-10-01 false Allowable costs. 417.802 Section 417.802...

  1. 20 CFR 632.258 - Allowable activities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Allowable activities. 632.258 Section 632.258 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.258 Allowable...

  2. 20 CFR 632.258 - Allowable activities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Allowable activities. 632.258 Section 632.258 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.258 Allowable...

  3. 19 CFR 191.141 - Drawback allowance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 2 2010-04-01 2010-04-01 false Drawback allowance. 191.141 Section 191.141 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) DRAWBACK Foreign-Built Jet Aircraft Engines Processed in the United States § 191.141 Drawback allowance. Section 313(h) of the...

  4. 21 CFR 1403.22 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... and an organization named in OMB Circular A-122 as not subject to that circular 48 CFR part 31... Drugs OFFICE OF NATIONAL DRUG CONTROL POLICY UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND... allowable costs of the grantees, subgrantees and cost-type contractors, including allowable costs in...

  5. 21 CFR 1403.22 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... and an organization named in OMB Circular A-122 as not subject to that circular 48 CFR part 31... Drugs OFFICE OF NATIONAL DRUG CONTROL POLICY UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND... allowable costs of the grantees, subgrantees and cost-type contractors, including allowable costs in...

  6. 21 CFR 1403.22 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... and an organization named in OMB Circular A-122 as not subject to that circular 48 CFR part 31... Drugs OFFICE OF NATIONAL DRUG CONTROL POLICY UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND... allowable costs of the grantees, subgrantees and cost-type contractors, including allowable costs in...

  7. 21 CFR 1403.22 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and an organization named in OMB Circular A-122 as not subject to that circular 48 CFR part 31... Drugs OFFICE OF NATIONAL DRUG CONTROL POLICY UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND... allowable costs of the grantees, subgrantees and cost-type contractors, including allowable costs in...

  8. 20 CFR 631.84 - Allowable projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Allowable projects. 631.84 Section 631.84... THE JOB TRAINING PARTNERSHIP ACT Disaster Relief Employment Assistance § 631.84 Allowable projects...) Shall be used exclusively to provide employment on projects that provide food, clothing, shelter...

  9. 7 CFR 550.25 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Acquisition Regulation (FAR) at 48 CFR part 31. Program Management ... at 2 CFR part 225. The allowability of costs incurred by non-profit organizations is determined in... at 2 CFR part 230. The allowability of costs incurred by institutions of higher education...

  10. 7 CFR 550.25 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Acquisition Regulation (FAR) at 48 CFR part 31. Program Management ... at 2 CFR part 225. The allowability of costs incurred by non-profit organizations is determined in... at 2 CFR part 230. The allowability of costs incurred by institutions of higher education...

  11. 20 CFR 631.84 - Allowable projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Allowable projects. 631.84 Section 631.84... THE JOB TRAINING PARTNERSHIP ACT Disaster Relief Employment Assistance § 631.84 Allowable projects...) Shall be used exclusively to provide employment on projects that provide food, clothing, shelter...

  12. 20 CFR 631.84 - Allowable projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Allowable projects. 631.84 Section 631.84... THE JOB TRAINING PARTNERSHIP ACT Disaster Relief Employment Assistance § 631.84 Allowable projects...) Shall be used exclusively to provide employment on projects that provide food, clothing, shelter...

  13. 38 CFR 3.810 - Clothing allowance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2011-07-01 2011-07-01 false Clothing allowance. 3.810 Section 3.810 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS ADJUDICATION Pension, Compensation, and Dependency and Indemnity Compensation Special Benefits § 3.810 Clothing allowance. (a) Except as provided in paragraph...

  14. 20 CFR 617.46 - Travel allowance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... mile at the prevailing mileage rate authorized under the Federal travel regulations (see 41 CFR part... prevailing per diem allowance rate authorized under the Federal travel regulations (see 41 CFR part 101-7... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Travel allowance. 617.46 Section...

  15. 30 CFR 1206.160 - Operating allowances.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Operating allowances. 1206.160 Section 1206.160 Mineral Resources OFFICE OF NATURAL RESOURCES REVENUE, DEPARTMENT OF THE INTERIOR NATURAL RESOURCES REVENUE PRODUCT VALUATION Federal Gas § 1206.160 Operating allowances. Notwithstanding any...

  16. 30 CFR 1206.160 - Operating allowances.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Operating allowances. 1206.160 Section 1206.160 Mineral Resources OFFICE OF NATURAL RESOURCES REVENUE, DEPARTMENT OF THE INTERIOR NATURAL RESOURCES REVENUE PRODUCT VALUATION Federal Gas § 1206.160 Operating allowances. Notwithstanding any...

  17. 30 CFR 1206.160 - Operating allowances.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Operating allowances. 1206.160 Section 1206.160 Mineral Resources OFFICE OF NATURAL RESOURCES REVENUE, DEPARTMENT OF THE INTERIOR NATURAL RESOURCES REVENUE PRODUCT VALUATION Federal Gas § 1206.160 Operating allowances. Notwithstanding any...

  18. Moral Appraisals Affect Doing/Allowing Judgments

    ERIC Educational Resources Information Center

    Cushman, Fiery; Knobe, Joshua; Sinnott-Armstrong, Walter

    2008-01-01

    An extensive body of research suggests that the distinction between doing and allowing plays a critical role in shaping moral appraisals. Here, we report evidence from a pair of experiments suggesting that the converse is also true: moral appraisals affect doing/allowing judgments. Specifically, morally bad behavior is more likely to be construed…

  19. 4 CFR 5.6 - Allowances.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 4 Accounts 1 2010-01-01 2010-01-01 false Allowances. 5.6 Section 5.6 Accounts GOVERNMENT ACCOUNTABILITY OFFICE PERSONNEL SYSTEM COMPENSATION § 5.6 Allowances. The provisions of chapter 59 of title 5, U.S. Code and the implementing regulations for the Executive Branch apply to Government...

  20. 28 CFR 100.11 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Allowable costs. 100.11 Section 100.11 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) COST RECOVERY REGULATIONS, COMMUNICATIONS ASSISTANCE FOR LAW ENFORCEMENT ACT OF 1994 § 100.11 Allowable costs. (a) Costs that are eligible...

  1. 28 CFR 66.22 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... than a hospital and an organization named in OBM Circular A-122 as not subject to that circular 48 CFR... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Allowable costs. 66.22 Section 66.22... Administration § 66.22 Allowable costs. (a) Limitation on use of funds. Grant funds may be used only for: (1)...

  2. 24 CFR 85.22 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Allowable costs. 85.22 Section 85... TRIBAL GOVERNMENTS Post-Award Requirements Financial Administration § 85.22 Allowable costs....

  3. 38 CFR 43.22 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or uniform cost... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Allowable costs. 43.22... Requirements Financial Administration § 43.22 Allowable costs. (a) Limitation on use of funds. Grant funds...

  4. 45 CFR 1174.22 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... than a hospital and an organization named in OBM Circular A-122 as not subject to that circular 48 CFR... 45 Public Welfare 3 2013-10-01 2013-10-01 false Allowable costs. 1174.22 Section 1174.22 Public....22 Allowable costs. (a) Limitation on use of funds. Grant funds may be used only for: (1)...

  5. 45 CFR 602.22 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CFR part 31. Contract Cost Principles and Procedures, or uniform cost accounting standards that comply... 45 Public Welfare 3 2013-10-01 2013-10-01 false Allowable costs. 602.22 Section 602.22 Public... Requirements § 602.22 Allowable costs. (a) Limitation on use of funds. Grant funds may be used only for:...

  6. 7 CFR 3016.22 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or... 7 Agriculture 15 2014-01-01 2014-01-01 false Allowable costs. 3016.22 Section 3016.22 Agriculture... GOVERNMENTS Post-Award Requirements Financial Administration § 3016.22 Allowable costs. (a) Limitation on...

  7. 45 CFR 92.22 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or uniform cost accounting... 45 Public Welfare 1 2014-10-01 2014-10-01 false Allowable costs. 92.22 Section 92.22 Public... Financial Administration § 92.22 Allowable costs. (a) Limitation on use of funds. Grant funds may be...

  8. 32 CFR 33.22 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or uniform cost... 32 National Defense 1 2014-07-01 2014-07-01 false Allowable costs. 33.22 Section 33.22 National... Post-Award Requirements Financial Administration § 33.22 Allowable costs. (a) Limitation on use...

  9. 45 CFR 92.22 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... to that circular 48 CFR Part 31. Contract Cost Principles and Procedures, or uniform cost accounting... 45 Public Welfare 1 2011-10-01 2011-10-01 false Allowable costs. 92.22 Section 92.22 Public... Financial Administration § 92.22 Allowable costs. (a) Limitation on use of funds. Grant funds may be...

  10. 40 CFR 31.22 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... not subject to that circular 48 CFR part 31, Contract Cost Principles and Procedures, or uniform cost... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Allowable costs. 31.22 Section 31.22... Requirements Financial Administration § 31.22 Allowable costs. (a) Limitation on use of funds. Grant funds...

  11. 24 CFR 85.22 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Allowable costs. 85.22 Section 85... TRIBAL GOVERNMENTS Post-Award Requirements Financial Administration § 85.22 Allowable costs....

  12. 30 CFR 735.24 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Allowable costs. 735.24 Section 735.24 Mineral... AND ENFORCEMENT § 735.24 Allowable costs. The Director or his authorized designee shall determine costs which may be reimbursed according to Office of Management and Budget Circular No. A-87....

  13. 20 CFR 633.303 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... otherwise indicated below, direct and indirect costs shall be charged in accordance with 41 CFR part 29-70... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Allowable costs. 633.303 Section 633.303... FARMWORKER PROGRAMS Program Design and Administrative Procedures § 633.303 Allowable costs. (a) General....

  14. 7 CFR 3016.22 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or... 7 Agriculture 15 2011-01-01 2011-01-01 false Allowable costs. 3016.22 Section 3016.22 Agriculture... GOVERNMENTS Post-Award Requirements Financial Administration § 3016.22 Allowable costs. (a) Limitation on...

  15. 38 CFR 43.22 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or uniform cost... 38 Pensions, Bonuses, and Veterans' Relief 2 2014-07-01 2014-07-01 false Allowable costs. 43.22... Requirements Financial Administration § 43.22 Allowable costs. (a) Limitation on use of funds. Grant funds...

  16. 42 CFR 417.802 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... considered allowable for HCPP reimbursement are the same as those for reasonable cost HMOs and CMPs specified... and other Part B supplier services furnished under arrangements is an allowable cost to the extent it... reasonable if they— (A) Do not exceed those that a prudent and cost-conscious buyer would incur to...

  17. 21 CFR 1315.24 - Inventory allowance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Inventory allowance. 1315.24 Section 1315.24 Food... EPHEDRINE, PSEUDOEPHEDRINE, AND PHENYLPROPANOLAMINE Individual Manufacturing Quotas § 1315.24 Inventory... registered manufacturer shall be allowed as a part of the quota an amount sufficient to maintain an...

  18. 21 CFR 1303.24 - Inventory allowance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Inventory allowance. 1303.24 Section 1303.24 Food... Quotas § 1303.24 Inventory allowance. (a) For the purpose of determining individual manufacturing quotas... sufficient to maintain an inventory equal to, (1) For current manufacturers, 50 percent of his...

  19. 28 CFR 70.27 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Regulation (FAR) at 48 CFR part 31. (b) OMB Circular A-122 does not cover the treatment of bid and proposal...-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.27 Allowable costs. (a.... Allowability of costs must be determined in accordance with the cost principles applicable to the...

  20. 7 CFR 550.25 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Acquisition Regulation (FAR) at 48 CFR part 31. Program Management ... at 2 CFR part 225. The allowability of costs incurred by non-profit organizations is determined in... at 2 CFR part 230. The allowability of costs incurred by institutions of higher education...

  1. 7 CFR 550.25 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Acquisition Regulation (FAR) at 48 CFR part 31. Program Management ... at 2 CFR part 225. The allowability of costs incurred by non-profit organizations is determined in... at 2 CFR part 230. The allowability of costs incurred by institutions of higher education...

  2. 28 CFR 70.27 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Regulation (FAR) at 48 CFR part 31. (b) OMB Circular A-122 does not cover the treatment of bid and proposal...-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.27 Allowable costs. (a.... Allowability of costs must be determined in accordance with the cost principles applicable to the...

  3. 7 CFR 550.25 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Acquisition Regulation (FAR) at 48 CFR part 31. Program Management ... at 2 CFR part 225. The allowability of costs incurred by non-profit organizations is determined in... at 2 CFR part 230. The allowability of costs incurred by institutions of higher education...

  4. 50 CFR 80.15 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., see 5 CFR 1310.3.). (b) What is required to determine the allowability of costs? Source documents or...) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS § 80.15 Allowable costs. (a) What...

  5. 10 CFR 600.317 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... OMB Circular A-122 is determined in accordance with the for-profit costs principles in 48 CFR part 31 in the Federal Acquisition Regulation, except that patent prosecution costs are not allowable unless... Organizations.” (iii) Hospitals. Allowability is determined in accordance with the provisions of 45 CFR part...

  6. 10 CFR 600.317 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... OMB Circular A-122 is determined in accordance with the for-profit costs principles in 48 CFR part 31 in the Federal Acquisition Regulation, except that patent prosecution costs are not allowable unless... Organizations.” (iii) Hospitals. Allowability is determined in accordance with the provisions of 45 CFR part...

  7. 10 CFR 600.317 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... OMB Circular A-122 is determined in accordance with the for-profit costs principles in 48 CFR part 31 in the Federal Acquisition Regulation, except that patent prosecution costs are not allowable unless... Organizations.” (iii) Hospitals. Allowability is determined in accordance with the provisions of 45 CFR part...

  8. Miniaturized pressurization system

    DOEpatents

    Whitehead, John C.; Swink, Don G.

    1991-01-01

    The invention uses a fluid stored at a low pressure and provides the fluid at a high pressure. The invention allows the low pressure fluid to flow to a fluid bore of a differential pump and from the pump to a fluid pressure regulator. After flowing through the regulator the fluid is converted to a gas which is directed to a gas bore of the differential pump. By controlling the flow of gas entering and being exhausted from the gas bore, the invention provides pressure to the fluid. By setting the regulator, the high pressure fluid can be set at predetermined values. Because the invention only needs a low pressure fluid, the inventive apparatus has a low mass, and therefore would be useful in rocket propulsion systems.

  9. Family Allowances and Fertility: Socioeconomic Differences

    PubMed Central

    SCHELLEKENS, JONA

    2009-01-01

    This article explores socioeconomic differences in the effect of family allowances on fertility. Although several studies have examined the relationship between cash benefits and fertility, few studies have addressed the possible differential effects of cash benefits on families of different income or education levels. I reconstructed the birth histories of women in the past two Israeli censuses of 1983 and 1995 to study socioeconomic differences in the effect of family allowances up to the seventh parity. The results indicate that family allowances have a significant effect at every parity. Using female education as an indicator of socioeconomic status, I find that socioeconomic status is a significant modifier of the effect of family allowances. Family allowances seem to have a relatively large impact on more-educated women. PMID:19771939

  10. 46 CFR 54.05-30 - Allowable stress values at low temperatures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Allowable stress values at low temperatures. 54.05-30... PRESSURE VESSELS Toughness Tests § 54.05-30 Allowable stress values at low temperatures. (a) The Coast... nonferrous materials at low temperature for the purpose of establishing allowable stress values for...

  11. 46 CFR 54.05-30 - Allowable stress values at low temperatures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Allowable stress values at low temperatures. 54.05-30... PRESSURE VESSELS Toughness Tests § 54.05-30 Allowable stress values at low temperatures. (a) The Coast... nonferrous materials at low temperature for the purpose of establishing allowable stress values for...

  12. 46 CFR 54.05-30 - Allowable stress values at low temperatures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Allowable stress values at low temperatures. 54.05-30... PRESSURE VESSELS Toughness Tests § 54.05-30 Allowable stress values at low temperatures. (a) The Coast... nonferrous materials at low temperature for the purpose of establishing allowable stress values for...

  13. 46 CFR 54.05-30 - Allowable stress values at low temperatures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Allowable stress values at low temperatures. 54.05-30... PRESSURE VESSELS Toughness Tests § 54.05-30 Allowable stress values at low temperatures. (a) The Coast... nonferrous materials at low temperature for the purpose of establishing allowable stress values for...

  14. 46 CFR 54.05-30 - Allowable stress values at low temperatures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Allowable stress values at low temperatures. 54.05-30... PRESSURE VESSELS Toughness Tests § 54.05-30 Allowable stress values at low temperatures. (a) The Coast... nonferrous materials at low temperature for the purpose of establishing allowable stress values for...

  15. Low-Pressure Generator Makes Cleanrooms Cleaner

    NASA Technical Reports Server (NTRS)

    2005-01-01

    Scientists at NASA's Kennedy Space Center work in cleanrooms: laboratories with high degrees of cleanliness provided by strict control of particles such as dust, lint, or human skin. They are contaminant-free facilities, where the air is repeatedly filtered, and surfaces are smooth to prevent particles from getting lodged. Technicians working in these environments wear specially designed cleanroom "bunny suits" and booties over their street clothes, as well as gloves and face masks to avoid any contamination that may be imparted from the outside world. Even normal paper is not allowed in cleanrooms, only cleanroom low-particulate paper. These are sensitive environments where precision work, like the production of silicon chips or hard disk drives, is performed. Often in cleanrooms, positive air pressure is used to force particles outside of the isolated area. The air pressure in the Kennedy cleanrooms is monitored using high-accuracy, low-differential pressure transducers that require periodic calibration. Calibration of the transducers is a tricky business. In prior years, the analysis was performed by sending the transducers to the Kennedy Standards Laboratory, where a very expensive cross-floated, labor- intensive, dead-weight test was conducted. In the early 1990s, scientists at Kennedy determined to develop a technique and find equipment to perform qualification testing on new low-differential pressure transducers in an accurate, cost-effective manner onsite, without requiring an environmentally controlled room. They decided to use the highly accurate, cost-effective Setra Model C264 as the test transducer. For qualification testing of the Setra, though, a portable, lower-cost calibrator was needed that could control the differential pressure to a high degree of resolution and transfer the accuracy of the Standards Laboratory testing to the qualification testing. The researchers decided that, to generate the low-differential pressure setpoints needed for

  16. Blood pressure

    MedlinePlus Videos and Cool Tools

    Normal blood pressure is important for proper blood flow to the body’s organs and tissues. The force of the blood on the walls of the arteries is called blood pressure. Blood pressure is measured both as the heart ...

  17. Blood pressure

    MedlinePlus Videos and Cool Tools

    Normal blood pressure is important for proper blood flow to the body’s organs and tissues. The force of the blood on the walls of the arteries is called blood pressure. Blood pressure is measured both ...

  18. 30 CFR 1220.012 - Overhead allowance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OIL AND GAS LEASES § 1220.012 Overhead allowance. (a) During the capital recovery period the overhead... under § 1220.011(c) that are salvaged, returned, or used for the benefit of non-NPSL operations....

  19. 36 CFR 1207.22 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or... of funds. Grant funds may be used only for: (1) The allowable costs of the grantees, subgrantees...

  20. 36 CFR 1207.22 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or... of funds. Grant funds may be used only for: (1) The allowable costs of the grantees, subgrantees...

  1. 36 CFR 1207.22 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or... of funds. Grant funds may be used only for: (1) The allowable costs of the grantees, subgrantees...

  2. 36 CFR 1207.22 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or... of funds. Grant funds may be used only for: (1) The allowable costs of the grantees, subgrantees...

  3. 36 CFR 1207.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or... of funds. Grant funds may be used only for: (1) The allowable costs of the grantees, subgrantees...

  4. 15 CFR 24.22 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... than a hospital and an organization named in OBM Circular A-122 as not subject to that circular 48 CFR... 15 Commerce and Foreign Trade 1 2011-01-01 2011-01-01 false Allowable costs. 24.22 Section 24.22... Administration § 24.22 Allowable costs. (a) Limitation on use of funds. Grant funds may be used only for: (1)...

  5. 15 CFR 24.22 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... than a hospital and an organization named in OBM Circular A-122 as not subject to that circular 48 CFR... 15 Commerce and Foreign Trade 1 2014-01-01 2014-01-01 false Allowable costs. 24.22 Section 24.22... Administration § 24.22 Allowable costs. (a) Limitation on use of funds. Grant funds may be used only for: (1)...

  6. Turbine governor change allows wide fuel gas choice

    SciTech Connect

    1995-10-01

    The Rolls-Royce Olympus SK30 turbine gen-sets providing power for Marathon Oil`s Brae A platform in the North Sea have recently been refitted with TC95-03 microprocessor governor control systems supplied by Turbine Controls Ltd., of, Leicester, England. The new control systems have been fitted to avoid the poor transient performance and damage that could occur under such conditions. The new fuel control system is designed to detect Wobbe Index variations while maintaining necessary protection and safety requirements of the gas turbine. In addition to being able to cope with varying gas composition, the governor has been programmed to permit variable fuel gas pressure. This has allowed the fuel gas pressure regulator to be removed, thereby eliminating many of the problems associated with the regulator. A fuel gas pressure transmitter has been added. In addition, replacing the governor has allowed some fairly minor modifications to start-up, loading and fuel changeover logic. These have resulted in significant improvements in the start-up and operational reliability.

  7. Regulatory treatment of allowances and compliance costs

    SciTech Connect

    Rose, K.

    1993-07-01

    The Clean Air Act Amendments of 1990 (CAAA) established a national emission allowance trading system, a market-based form of environmental regulation designed to reduce and limit sulfur dioxide emissions. However, the allowance trading system is being applied primarily to an economically regulated electric utility industry. The combining of the new form of environmental regulation and economic regulation of electric utilities has raised a number of questions including what the role should be of the federal and state utility regulating commissions and how those actions will affect the decision making process of the utilities and the allowance market. There are several dimensions to the regulatory problems that commissions face. Allowances and utility compliance expenditures have implications for least-cost/IPR (integrated resource planning), prudence review procedures, holding company and multistate utility regulation and ratemaking treatment. The focus of this paper is on the ratemaking treatment. The following topics are covered: ratemaking treatment of allowances and compliance costs; Traditional cost-recovery mechanisms; limitations to the traditional approach; traditional approach and the allowance trading market; market-based cost recovery mechanisms; methods of determining the benchmark; determining the split between ratepayers and the utility; other regulatory approaches; limitations of incentive mechanisms.

  8. System for calibrating pressure transducer

    NASA Technical Reports Server (NTRS)

    Rollins, G. N. (Inventor)

    1973-01-01

    A system for calibrating a pressure transducer which has a reference portion and an active portion is reported. A miniature selector valve is positioned immediately adjacent the pressure transducer. A reference pressure, known pressure, and unknown pressure can be selectively admitted to the active side of the pressure transducer by the selector valve to enable calibration of the transducer. A valve admits pressure to the selector valve which has a piston and floating piston arrangement which allows proper selection with very small linear movement.

  9. 40 CFR 35.940-5 - Disputes concerning allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Disputes concerning allowable costs. 35.940-5 Section 35.940-5 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water...

  10. 40 CFR 35.940 - Determination of allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Determination of allowable costs. 35.940 Section 35.940 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act §...

  11. Measurement of endolymphatic pressure.

    PubMed

    Mom, T; Pavier, Y; Giraudet, F; Gilain, L; Avan, P

    2015-04-01

    Endolymphatic pressure measurement is of interest both to researchers in the physiology and pathophysiology of hearing and ENT physicians dealing with Menière's disease or similar conditions. It is generally agreed that endolymphatic hydrops is associated with Menière's disease and is accompanied by increased hydrostatic pressure. Endolymphatic pressure, however, cannot be measured precisely without endangering hearing, making the association between hydrops and increased endolymphatic pressure difficult to demonstrate. Several integrated in vivo models have been developed since the 1960s, but only a few allow measurement of endolymphatic hydrostatic pressure. Models associating measurement of hydrostatic pressure and endolymphatic potential and assessment of cochlear function are of value to elucidate the pathophysiology of endolymphatic hydrops. The present article presents the main types of models and discusses their respective interest. PMID:25467202

  12. Pressure Sores

    MedlinePlus

    ... may form. Pressure sores are also called bedsores, pressure ulcers and decubitus ulcers. Symptoms What are the symptoms ... do to help pressure sores heal: Relieving the pressure that caused the sore Treating the sore itself Improving nutrition and other conditions to help the sore heal ...

  13. Spacecraft Minimum Allowable Concentrations: Determination, Application, and Contingency Situations

    NASA Technical Reports Server (NTRS)

    Marshburn, Thomas H.; Dawson, David L. (Technical Monitor)

    1999-01-01

    This document is an outline of a presentation about the determination of minimum allowable concentrations in spacecraft. The presentation reviews the type of toxins and mechanisms to determine the acceptable concentrations of these toxic substances. The considerations for the unique situation that spaceflight entails including zero gravity, and the intense scrutiny are reviewed. The current measurement hardware is reviewed. The spacecraft atmospheres on the Shuttle, airflow, the Space Station and the EMU in respect to airflow, pressure, constituents are also summarized. Contingency situations and potential hazards are also discussed.

  14. 44 CFR 11.73 - Allowable claims.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Allowable claims. 11.73 Section 11.73 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... request of, or with the knowledge and consent of, superior authority or by reason of necessity. (8)...

  15. 44 CFR 11.73 - Allowable claims.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Allowable claims. 11.73 Section 11.73 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... request of, or with the knowledge and consent of, superior authority or by reason of necessity. (8)...

  16. 24 CFR 85.22 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Allowable costs. 85.22 Section 85.22 Housing and Urban Development Office of the Secretary, Department of Housing and Urban...

  17. 24 CFR 85.22 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Allowable costs. 85.22 Section 85.22 Housing and Urban Development Office of the Secretary, Department of Housing and Urban...

  18. 30 CFR 220.012 - Overhead allowance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Overhead allowance. 220.012 Section 220.012 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR MINERALS REVENUE MANAGEMENT ACCOUNTING PROCEDURES FOR DETERMINING NET PROFIT SHARE PAYMENT FOR OUTER CONTINENTAL SHELF OIL AND GAS...

  19. 30 CFR 1220.012 - Overhead allowance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Overhead allowance. 1220.012 Section 1220.012 Mineral Resources OFFICE OF NATURAL RESOURCES REVENUE, DEPARTMENT OF THE INTERIOR NATURAL RESOURCES REVENUE ACCOUNTING PROCEDURES FOR DETERMINING NET PROFIT SHARE PAYMENT FOR OUTER CONTINENTAL SHELF OIL...

  20. 29 CFR 15.22 - Allowable claims.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... service with the Department and: (l) The damage or loss was not caused wholly or partly by the negligent... the other provisions of this subpart, any claim for damage to, or loss, of personal property incident... authorized places. Claims may be allowable for damage to, or loss of, property arising from fire,...

  1. 45 CFR 2543.27 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CFR part 74, “Principles for Determining Costs Applicable to Research and Development Under Grants and... provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Allowable costs. 2543.27 Section 2543.27...

  2. 43 CFR 12.62 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Circular A-122 as not subject to that circular 48 CFR Part 31. Contract Cost Principles and Procedures, or... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Allowable costs. 12.62 Section 12.62... COST PRINCIPLES FOR ASSISTANCE PROGRAMS Uniform Administrative Requirements for Grants and...

  3. 24 CFR 84.27 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... of Appendix E of 45 CFR part 74, “Principles for Determining Costs Applicable to Research and... accordance with the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Allowable costs. 84.27 Section...

  4. 45 CFR 34.4 - Allowable claims.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the claimant to save human life or government property. (4) Property used for the benefit of the... 45 Public Welfare 1 2014-10-01 2014-10-01 false Allowable claims. 34.4 Section 34.4 Public Welfare Department of Health and Human Services GENERAL ADMINISTRATION CLAIMS FILED UNDER THE MILITARY PERSONNEL...

  5. 45 CFR 34.4 - Allowable claims.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the claimant to save human life or government property. (4) Property used for the benefit of the... 45 Public Welfare 1 2011-10-01 2011-10-01 false Allowable claims. 34.4 Section 34.4 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CLAIMS FILED UNDER THE MILITARY PERSONNEL...

  6. 45 CFR 34.4 - Allowable claims.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the claimant to save human life or government property. (4) Property used for the benefit of the... 45 Public Welfare 1 2012-10-01 2012-10-01 false Allowable claims. 34.4 Section 34.4 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CLAIMS FILED UNDER THE MILITARY PERSONNEL...

  7. 45 CFR 34.4 - Allowable claims.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the claimant to save human life or government property. (4) Property used for the benefit of the... 45 Public Welfare 1 2013-10-01 2013-10-01 false Allowable claims. 34.4 Section 34.4 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CLAIMS FILED UNDER THE MILITARY PERSONNEL...

  8. 22 CFR 135.22 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... named in OBM Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Allowable costs. 135.22 Section 135.22 Foreign... AGREEMENTS TO STATE AND LOCAL GOVERNMENTS Post-Award Requirements Financial Administration § 135.22...

  9. 22 CFR 135.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... named in OBM Circular A-122 as not subject to that circular 48 CFR Part 31. Contract Cost Principles and... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Allowable costs. 135.22 Section 135.22 Foreign... AGREEMENTS TO STATE AND LOCAL GOVERNMENTS Post-Award Requirements Financial Administration § 135.22...

  10. 22 CFR 135.22 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... named in OBM Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Allowable costs. 135.22 Section 135.22 Foreign... AGREEMENTS TO STATE AND LOCAL GOVERNMENTS Post-Award Requirements Financial Administration § 135.22...

  11. 22 CFR 135.22 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... named in OBM Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Allowable costs. 135.22 Section 135.22 Foreign... AGREEMENTS TO STATE AND LOCAL GOVERNMENTS Post-Award Requirements Financial Administration § 135.22...

  12. 22 CFR 135.22 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... named in OBM Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Allowable costs. 135.22 Section 135.22 Foreign... AGREEMENTS TO STATE AND LOCAL GOVERNMENTS Post-Award Requirements Financial Administration § 135.22...

  13. 42 CFR 405.2468 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Allowable costs. 405.2468 Section 405.2468 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES MEDICARE PROGRAM FEDERAL HEALTH INSURANCE FOR THE AGED AND DISABLED Rural Health Clinic and Federally Qualified Health Center Services Payment for Rural...

  14. 78 FR 32629 - Post Allowance and Refiling

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-31

    ... United States Patent and Trademark Office Post Allowance and Refiling ACTION: Proposed collection; comment request. SUMMARY: The United States Patent and Trademark Office (USPTO), as part of its continuing... States Patent and Trademark Office, P.O. Box 1450, Alexandria, VA 22313-1450. Federal Rulemaking...

  15. Allowance trading: Market operations and regulatory response

    SciTech Connect

    Bailey, K.A.; South, D.W.; McDermott, K.A.

    1992-01-01

    The use of the SO[sub 2] allowance system as defined by Title IV of the 1990 Clean Air Act Amendments offers utilities greater compliance flexibility than EPA technology standards, State Implementation Plan (SEP) performance standards, or EPA bubble/offset strategies. Traditional methods at best offered the utility the ability to trade emissions between different units at a particular plant. The SO[sub 2] emissions trading system advocated under Title IV will allow a utility to trade emissions across its utility system, and/or trade emissions between utilities to take advantage of interfirm control cost differences. The use of transferable emission allowances offers utilities greater flexibility in the choice of how to control emissions: the choices include fuel switching, flue gas scrubbing, environmental dispatch, repowering, and even the choice not to control emissions [as long as the New Source Performance Standards (NSPS) and Prevention of Significant Deterioration (PSD) requirements are met]. The added flexibility allows utilities to choose the least cost manner of compliance with Title IV requirements. It is hoped (intended) that pollution control cost-minimization by individual utilities will in turn reduce the cost of controlling SO[sub 2] for the electric utility industry in aggregate. In addition, through the use of NO[sub x] emission averaging, the utility would average NO[sub x] emissions from different point sources in order to comply with the prescribed emission standard.

  16. Allowance trading: Market operations and regulatory response

    SciTech Connect

    Bailey, K.A.; South, D.W.; McDermott, K.A.

    1992-12-31

    The use of the SO{sub 2} allowance system as defined by Title IV of the 1990 Clean Air Act Amendments offers utilities greater compliance flexibility than EPA technology standards, State Implementation Plan (SEP) performance standards, or EPA bubble/offset strategies. Traditional methods at best offered the utility the ability to trade emissions between different units at a particular plant. The SO{sub 2} emissions trading system advocated under Title IV will allow a utility to trade emissions across its utility system, and/or trade emissions between utilities to take advantage of interfirm control cost differences. The use of transferable emission allowances offers utilities greater flexibility in the choice of how to control emissions: the choices include fuel switching, flue gas scrubbing, environmental dispatch, repowering, and even the choice not to control emissions [as long as the New Source Performance Standards (NSPS) and Prevention of Significant Deterioration (PSD) requirements are met]. The added flexibility allows utilities to choose the least cost manner of compliance with Title IV requirements. It is hoped (intended) that pollution control cost-minimization by individual utilities will in turn reduce the cost of controlling SO{sub 2} for the electric utility industry in aggregate. In addition, through the use of NO{sub x} emission averaging, the utility would average NO{sub x} emissions from different point sources in order to comply with the prescribed emission standard.

  17. 15 CFR 921.81 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Allowable costs. 921.81 Section 921.81 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT NATIONAL ESTUARINE RESEARCH RESERVE...

  18. 20 CFR 435.27 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... CFR part 74, “Principles for Determining Costs Applicable to Research and Development Under Grants and... provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.27 Allowable costs. For each...

  19. 15 CFR 14.27 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CFR part 74, “Principles for Determining Costs Applicable to Research and Development Under Grants and... provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.27 Allowable costs. For each kind...

  20. 36 CFR 1210.27 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the provisions of Appendix E of 45 CFR Part 74, “Principles for Determining Costs Applicable to... the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR Part 31. ... Management § 1210.27 Allowable costs. For each kind of recipient, there is a set of Federal principles...

  1. 20 CFR 435.27 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... CFR part 74, “Principles for Determining Costs Applicable to Research and Development Under Grants and... provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.27 Allowable costs. For each...

  2. 44 CFR 13.22 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Allowable costs. 13.22 Section 13.22 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT...

  3. 44 CFR 208.33 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... Consistent with Office of Management and Budget (OMB) Circulars A-21, A-87, A-102 and A-110 (2 CFR part 215... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Allowable costs. 208.33 Section 208.33 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT...

  4. 22 CFR 226.27 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... of Appendix E of 45 CFR part 74, “Principles for Determining Costs Applicable to Research and... accordance with the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-award Requirements Financial and Program Management § 226.27 Allowable costs. For each...

  5. 7 CFR 3019.27 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the provisions of Appendix E of 45 CFR part 74, “Principles for Determining Costs Applicable to... determined in accordance with the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... Management § 3019.27 Allowable costs. For each kind of recipient, there is a set of Federal principles...

  6. 34 CFR 74.27 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... Educational institution OMB Circular A-21. Hospital Appendix E to 45 CFR part 74. Commercial for-profit organization other than a hospital and an educational institution 48 CFR part 31 Contract Cost Principles and... and Program Management § 74.27 Allowable costs. (a) For each kind of recipient, there is a set of...

  7. 44 CFR 79.8 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Allowable costs. 79.8 Section 79.8 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND... Management Costs—(i) Grantee. States are eligible to receive management costs consisting of a maximum of...

  8. 22 CFR 226.27 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... of Appendix E of 45 CFR part 74, “Principles for Determining Costs Applicable to Research and... accordance with the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-award Requirements Financial and Program Management § 226.27 Allowable costs. For each...

  9. 45 CFR 2543.27 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CFR part 74, “Principles for Determining Costs Applicable to Research and Development Under Grants and... provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.27 Allowable costs. For each...

  10. 44 CFR 79.8 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Allowable costs. 79.8 Section 79.8 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND... Management Costs—(i) Grantee. States are eligible to receive management costs consisting of a maximum of...

  11. 44 CFR 13.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Allowable costs. 13.22 Section 13.22 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT...

  12. 44 CFR 208.33 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... Consistent with Office of Management and Budget (OMB) Circulars A-21, A-87, A-102 and A-110 (2 CFR part 215... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Allowable costs. 208.33 Section 208.33 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT...

  13. 36 CFR 1210.27 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the provisions of Appendix E of 45 CFR Part 74, “Principles for Determining Costs Applicable to... the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR Part 31. ... Management § 1210.27 Allowable costs. For each kind of recipient, there is a set of Federal principles...

  14. 22 CFR 518.27 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... is determined in accordance with the provisions of Appendix E of 45 CFR part 74, “Principles for... Regulation (FAR) at 48 CFR part 31. ... Financial and Program Management § 518.27 Allowable costs. For each kind of recipient, there is a set...

  15. 22 CFR 518.27 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... is determined in accordance with the provisions of Appendix E of 45 CFR part 74, “Principles for... Regulation (FAR) at 48 CFR part 31. ... Financial and Program Management § 518.27 Allowable costs. For each kind of recipient, there is a set...

  16. 15 CFR 14.27 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CFR part 74, “Principles for Determining Costs Applicable to Research and Development Under Grants and... provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.27 Allowable costs. For each kind...

  17. 7 CFR 3019.27 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the provisions of Appendix E of 45 CFR part 74, “Principles for Determining Costs Applicable to... determined in accordance with the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... Management § 3019.27 Allowable costs. For each kind of recipient, there is a set of Federal principles...

  18. 40 CFR 30.27 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of appendix E of 45 CFR part 74, “Principles for Determining Costs Applicable to Research and... accordance with the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. In addition... costs. Allowability of costs shall be determined in accordance with the cost principles applicable...

  19. 49 CFR 19.27 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the provisions of Appendix E of 45 CFR part 74, “Principles for Determining Costs Applicable to... determined in accordance with the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... 49 Transportation 1 2010-10-01 2010-10-01 false Allowable costs. 19.27 Section...

  20. 49 CFR 18.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... named in OBM Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and... transportation services provided leasing is more cost effective than acquisition or construction. ... 49 Transportation 1 2010-10-01 2010-10-01 false Allowable costs. 18.22 Section...

  1. 5 CFR 180.104 - Allowable claims.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Allowable claims. 180.104 Section 180.104 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS EMPLOYEES' PERSONAL PROPERTY... are payable: (i) Where personal funds were accepted by responsible Government personnel with...

  2. 19 CFR 191.101 - Drawback allowance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Preparations (Including Perfumery) Manufactured From Domestic Tax-Paid Alcohol § 191.101 Drawback allowance. (a... perfumery) manufactured or produced in the United States in part from the domestic tax-paid alcohol. (b... tax on flavoring extracts or medicinal or toilet preparations (including perfumery) manufactured...

  3. 44 CFR 208.33 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... Consistent with Office of Management and Budget (OMB) Circulars A-21, A-87, A-102 and A-110 (2 CFR part 215... Agreements § 208.33 Allowable costs. (a) Cost neutrality. DHS policy is that an Alert or Activation should be as cost neutral as possible to Sponsoring Agencies and Participating Agencies. To make an Alert...

  4. 44 CFR 208.33 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... Consistent with Office of Management and Budget (OMB) Circulars A-21, A-87, A-102 and A-110 (2 CFR part 215... Agreements § 208.33 Allowable costs. (a) Cost neutrality. DHS policy is that an Alert or Activation should be as cost neutral as possible to Sponsoring Agencies and Participating Agencies. To make an Alert...

  5. 44 CFR 208.33 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... Consistent with Office of Management and Budget (OMB) Circulars A-21, A-87, A-102 and A-110 (2 CFR part 215... Agreements § 208.33 Allowable costs. (a) Cost neutrality. DHS policy is that an Alert or Activation should be as cost neutral as possible to Sponsoring Agencies and Participating Agencies. To make an Alert...

  6. 28 CFR 70.27 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.27 Allowable costs. (a... current period. However, if the recipient's established practice is to treat these costs by some other... Regulation (FAR) at 48 CFR part 31. (b) OMB Circular A-122 does not cover the treatment of bid and...

  7. 28 CFR 70.27 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.27 Allowable costs. (a... current period. However, if the recipient's established practice is to treat these costs by some other... Regulation (FAR) at 48 CFR part 31. (b) OMB Circular A-122 does not cover the treatment of bid and...

  8. 34 CFR 80.22 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CFR part 31. Contract Cost Principles and Procedures, or uniform cost accounting standards that comply... 34 Education 1 2010-07-01 2010-07-01 false Allowable costs. 80.22 Section 80.22 Education Office of the Secretary, Department of Education UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS...

  9. 27 CFR 40.472 - Allowance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... allowance of the tax where the cigarette papers and tubes, after removal from the factory upon determination... perjury and shall show the date the cigarette papers and tubes were removed from the factory. A claim... THE TREASURY (CONTINUED) TOBACCO MANUFACTURE OF TOBACCO PRODUCTS, CIGARETTE PAPERS AND TUBES,...

  10. 27 CFR 40.472 - Allowance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... allowance of the tax where the cigarette papers and tubes, after removal from the factory upon determination... perjury and shall show the date the cigarette papers and tubes were removed from the factory. A claim... THE TREASURY (CONTINUED) TOBACCO MANUFACTURE OF TOBACCO PRODUCTS, CIGARETTE PAPERS AND TUBES,...

  11. 27 CFR 40.472 - Allowance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... allowance of the tax where the cigarette papers and tubes, after removal from the factory upon determination... perjury and shall show the date the cigarette papers and tubes were removed from the factory. A claim... THE TREASURY (CONTINUED) TOBACCO MANUFACTURE OF TOBACCO PRODUCTS, CIGARETTE PAPERS AND TUBES,...

  12. 21 CFR 1315.24 - Inventory allowance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 9 2014-04-01 2014-04-01 false Inventory allowance. 1315.24 Section 1315.24 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE IMPORTATION AND PRODUCTION QUOTAS FOR EPHEDRINE, PSEUDOEPHEDRINE, AND PHENYLPROPANOLAMINE Individual Manufacturing Quotas § 1315.24...

  13. 21 CFR 1315.24 - Inventory allowance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 9 2012-04-01 2012-04-01 false Inventory allowance. 1315.24 Section 1315.24 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE IMPORTATION AND PRODUCTION QUOTAS FOR EPHEDRINE, PSEUDOEPHEDRINE, AND PHENYLPROPANOLAMINE Individual Manufacturing Quotas § 1315.24...

  14. 21 CFR 1315.24 - Inventory allowance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Inventory allowance. 1315.24 Section 1315.24 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE IMPORTATION AND PRODUCTION QUOTAS FOR EPHEDRINE, PSEUDOEPHEDRINE, AND PHENYLPROPANOLAMINE Individual Manufacturing Quotas § 1315.24...

  15. 21 CFR 1315.24 - Inventory allowance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 9 2013-04-01 2013-04-01 false Inventory allowance. 1315.24 Section 1315.24 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE IMPORTATION AND PRODUCTION QUOTAS FOR EPHEDRINE, PSEUDOEPHEDRINE, AND PHENYLPROPANOLAMINE Individual Manufacturing Quotas § 1315.24...

  16. 20 CFR 633.303 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... otherwise indicated below, direct and indirect costs shall be charged in accordance with 41 CFR part 29-70... be allowable, a cost must be necessary and reasonable for proper and efficient administration of the... billed as a single unit charge do not have to be allocated or prorated among the several cost...

  17. 29 CFR 15.22 - Allowable claims.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Department and: (l) The damage or loss was not caused wholly or partly by the negligent or wrongful act or... subpart, any claim for damage to, or loss, of personal property incident to service with the Department... excluded: (1) Property or damage in quarters or other authorized places. Claims may be allowable for...

  18. 20 CFR 632.37 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... otherwise indicated below, direct and indirect costs shall be charged in accordance with 41 CFR 29-70 and 41 CFR 1-15.7. (c) Costs associated with repairs, maintenance, and capital improvements of existing... charged to the program shall be consistent with those normally allowed in like circumstances and,...

  19. 20 CFR 632.37 - Allowable costs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... otherwise indicated below, direct and indirect costs shall be charged in accordance with 41 CFR 29-70 and 41 CFR 1-15.7. (c) Costs associated with repairs, maintenance, and capital improvements of existing... charged to the program shall be consistent with those normally allowed in like circumstances and,...

  20. 20 CFR 632.37 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... otherwise indicated below, direct and indirect costs shall be charged in accordance with 41 CFR 29-70 and 41 CFR 1-15.7. (c) Costs associated with repairs, maintenance, and capital improvements of existing... charged to the program shall be consistent with those normally allowed in like circumstances and,...

  1. 33 CFR 136.205 - Compensation allowable.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Compensation allowable. 136.205 Section 136.205 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY TRUST FUND;...

  2. 33 CFR 136.211 - Compensation allowable.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Compensation allowable. 136.211 Section 136.211 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY TRUST FUND;...

  3. 33 CFR 136.223 - Compensation allowable.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Compensation allowable. 136.223 Section 136.223 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY TRUST FUND;...

  4. 33 CFR 136.217 - Compensation allowable.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Compensation allowable. 136.217 Section 136.217 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY TRUST FUND;...

  5. 33 CFR 136.229 - Compensation allowable.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Compensation allowable. 136.229 Section 136.229 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY TRUST FUND;...

  6. 43 CFR 12.62 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Circular A-122 as not subject to that circular 48 CFR Part 31. Contract Cost Principles and Procedures, or... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Allowable costs. 12.62 Section 12.62 Public Lands: Interior Office of the Secretary of the Interior ADMINISTRATIVE AND AUDIT REQUIREMENTS AND...

  7. Manpower Training Allowances: Financial Assistance or Investment?

    ERIC Educational Resources Information Center

    Latour, Georges

    1975-01-01

    The author compares the differing approaches of Germany, Sweden, France, and Australia for providing financial support to adults enrolled in vocational training programs, focusing on training allowances for recurrent education. He concludes that without some governmental maintenance program, it is unlikely that adults can utilize even tuition-free…

  8. 42 CFR 417.802 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 3 2013-10-01 2013-10-01 false Allowable costs. 417.802 Section 417.802 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM (CONTINUED) HEALTH MAINTENANCE ORGANIZATIONS, COMPETITIVE MEDICAL PLANS, AND HEALTH CARE PREPAYMENT PLANS Health Care Prepayment...

  9. 10 CFR 440.18 - Allowable expenditures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the purchase of vehicles or other certain types of equipment as defined in 10 CFR part 600 may be... 10 Energy 3 2010-01-01 2010-01-01 false Allowable expenditures. 440.18 Section 440.18 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION WEATHERIZATION ASSISTANCE FOR LOW-INCOME PERSONS § 440.18...

  10. 10 CFR 440.18 - Allowable expenditures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the purchase of vehicles or other certain types of equipment as defined in 10 CFR part 600 may be... 10 Energy 3 2013-01-01 2013-01-01 false Allowable expenditures. 440.18 Section 440.18 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION WEATHERIZATION ASSISTANCE FOR LOW-INCOME PERSONS § 440.18...

  11. 10 CFR 440.18 - Allowable expenditures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the purchase of vehicles or other certain types of equipment as defined in 10 CFR part 600 may be... 10 Energy 3 2014-01-01 2014-01-01 false Allowable expenditures. 440.18 Section 440.18 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION WEATHERIZATION ASSISTANCE FOR LOW-INCOME PERSONS § 440.18...

  12. 10 CFR 440.18 - Allowable expenditures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the purchase of vehicles or other certain types of equipment as defined in 10 CFR part 600 may be... 10 Energy 3 2011-01-01 2011-01-01 false Allowable expenditures. 440.18 Section 440.18 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION WEATHERIZATION ASSISTANCE FOR LOW-INCOME PERSONS § 440.18...

  13. 10 CFR 440.18 - Allowable expenditures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the purchase of vehicles or other certain types of equipment as defined in 10 CFR part 600 may be... 10 Energy 3 2012-01-01 2012-01-01 false Allowable expenditures. 440.18 Section 440.18 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION WEATHERIZATION ASSISTANCE FOR LOW-INCOME PERSONS § 440.18...

  14. 45 CFR 2543.27 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CFR part 74, “Principles for Determining Costs Applicable to Research and Development Under Grants and... provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.27 Allowable costs. For each...

  15. 15 CFR 14.27 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CFR part 74, “Principles for Determining Costs Applicable to Research and Development Under Grants and... provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.27 Allowable costs. For each kind...

  16. 44 CFR 13.22 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Allowable costs. 13.22 Section 13.22 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT...

  17. 7 CFR 3019.27 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the provisions of Appendix E of 45 CFR part 74, “Principles for Determining Costs Applicable to... determined in accordance with the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... Management § 3019.27 Allowable costs. For each kind of recipient, there is a set of Federal principles...

  18. 44 CFR 13.22 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Allowable costs. 13.22 Section 13.22 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF...

  19. 44 CFR 79.8 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Allowable costs. 79.8 Section 79.8 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND... Management Costs—(i) Grantee. States are eligible to receive management costs consisting of a maximum of...

  20. 22 CFR 226.27 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... of Appendix E of 45 CFR part 74, “Principles for Determining Costs Applicable to Research and... accordance with the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-award Requirements Financial and Program Management § 226.27 Allowable costs. For each...

  1. 45 CFR 2543.27 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CFR part 74, “Principles for Determining Costs Applicable to Research and Development Under Grants and... provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.27 Allowable costs. For each...

  2. 22 CFR 518.27 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... is determined in accordance with the provisions of Appendix E of 45 CFR part 74, “Principles for... Regulation (FAR) at 48 CFR part 31. ... Financial and Program Management § 518.27 Allowable costs. For each kind of recipient, there is a set...

  3. 22 CFR 226.27 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... of Appendix E of 45 CFR part 74, “Principles for Determining Costs Applicable to Research and... accordance with the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-award Requirements Financial and Program Management § 226.27 Allowable costs. For each...

  4. 22 CFR 226.27 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... of Appendix E of 45 CFR part 74, “Principles for Determining Costs Applicable to Research and... accordance with the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-award Requirements Financial and Program Management § 226.27 Allowable costs. For each...

  5. 20 CFR 435.27 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... CFR part 74, “Principles for Determining Costs Applicable to Research and Development Under Grants and... provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.27 Allowable costs. For each...

  6. 45 CFR 74.27 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... determined in accordance with the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31..., AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.27... cost principles applicable to the entity incurring the costs. Thus, allowability of costs incurred...

  7. 22 CFR 518.27 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... is determined in accordance with the provisions of Appendix E of 45 CFR part 74, “Principles for... Regulation (FAR) at 48 CFR part 31. ... Financial and Program Management § 518.27 Allowable costs. For each kind of recipient, there is a set...

  8. 22 CFR 518.27 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... is determined in accordance with the provisions of Appendix E of 45 CFR part 74, “Principles for... Regulation (FAR) at 48 CFR part 31. ... Financial and Program Management § 518.27 Allowable costs. For each kind of recipient, there is a set...

  9. 44 CFR 79.8 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Allowable costs. 79.8 Section 79.8 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND... Management Costs—(i) Grantee. States are eligible to receive management costs consisting of a maximum of...

  10. 45 CFR 74.27 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... determined in accordance with the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31..., AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.27... cost principles applicable to the entity incurring the costs. Thus, allowability of costs incurred...

  11. 36 CFR 1210.27 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the provisions of Appendix E of 45 CFR Part 74, “Principles for Determining Costs Applicable to... the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR Part 31. ... Management § 1210.27 Allowable costs. For each kind of recipient, there is a set of Federal principles...

  12. 20 CFR 435.27 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... CFR part 74, “Principles for Determining Costs Applicable to Research and Development Under Grants and... provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.27 Allowable costs. For each...

  13. 15 CFR 14.27 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CFR part 74, “Principles for Determining Costs Applicable to Research and Development Under Grants and... provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.27 Allowable costs. For each kind...

  14. 7 CFR 3019.27 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the provisions of Appendix E of 45 CFR part 74, “Principles for Determining Costs Applicable to... determined in accordance with the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... Management § 3019.27 Allowable costs. For each kind of recipient, there is a set of Federal principles...

  15. 36 CFR 1210.27 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the provisions of Appendix E of 45 CFR Part 74, “Principles for Determining Costs Applicable to... the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR Part 31. ... Management § 1210.27 Allowable costs. For each kind of recipient, there is a set of Federal principles...

  16. 45 CFR 2543.27 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CFR part 74, “Principles for Determining Costs Applicable to Research and Development Under Grants and... provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.27 Allowable costs. For each...

  17. 44 CFR 13.22 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Circular A-122 as not subject to that circular 48 CFR part 31. Contract Cost Principles and Procedures, or... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Allowable costs. 13.22 Section 13.22 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT...

  18. 20 CFR 435.27 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... CFR part 74, “Principles for Determining Costs Applicable to Research and Development Under Grants and... provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.27 Allowable costs. For each...

  19. 15 CFR 14.27 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CFR part 74, “Principles for Determining Costs Applicable to Research and Development Under Grants and... provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.27 Allowable costs. For each kind...

  20. 7 CFR 3019.27 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the provisions of Appendix E of 45 CFR part 74, “Principles for Determining Costs Applicable to... determined in accordance with the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR part 31. ... Management § 3019.27 Allowable costs. For each kind of recipient, there is a set of Federal principles...

  1. 36 CFR 1210.27 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the provisions of Appendix E of 45 CFR Part 74, “Principles for Determining Costs Applicable to... the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR Part 31. ... Management § 1210.27 Allowable costs. For each kind of recipient, there is a set of Federal principles...

  2. 44 CFR 11.73 - Allowable claims.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Allowable claims. 11.73 Section 11.73 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... request of, or with the knowledge and consent of, superior authority or by reason of necessity. (8)...

  3. 27 CFR 40.472 - Allowance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 2 2011-04-01 2011-04-01 false Allowance. 40.472 Section 40.472 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY (CONTINUED) TOBACCO MANUFACTURE OF TOBACCO PRODUCTS, CIGARETTE PAPERS AND TUBES, AND PROCESSED TOBACCO Manufacture of Cigarette...

  4. 27 CFR 40.472 - Allowance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 2 2010-04-01 2010-04-01 false Allowance. 40.472 Section 40.472 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY (CONTINUED) TOBACCO MANUFACTURE OF TOBACCO PRODUCTS, CIGARETTE PAPERS AND TUBES, AND PROCESSED TOBACCO Manufacture of Cigarette...

  5. 45 CFR 34.4 - Allowable claims.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CLAIMS FILED UNDER THE MILITARY PERSONNEL AND... the claimant to save human life or government property. (4) Property used for the benefit of the government. Claims may be allowed for damage to, or loss of, property used for the benefit of the...

  6. 32 CFR 34.17 - Allowable costs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... organizations, is to be determined in accordance with: (1) The for-profit cost principles in 48 CFR parts 31 and.... (3) Hospitals. Allowability is determined in accordance with the provisions of 45 CFR part 74... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH FOR-PROFIT ORGANIZATIONS Post-award...

  7. 32 CFR 34.17 - Allowable costs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... organizations, is to be determined in accordance with: (1) The for-profit cost principles in 48 CFR parts 31 and.... (3) Hospitals. Allowability is determined in accordance with the provisions of 45 CFR part 74... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH FOR-PROFIT ORGANIZATIONS Post-award...

  8. 32 CFR 34.17 - Allowable costs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... organizations, is to be determined in accordance with: (1) The for-profit cost principles in 48 CFR parts 31 and.... (3) Hospitals. Allowability is determined in accordance with the provisions of 45 CFR part 74... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH FOR-PROFIT ORGANIZATIONS Post-award...

  9. Differential pressure pin discharge apparatus

    DOEpatents

    Oakley, David J.

    1987-01-01

    Disclosed is a discharge assembly for allowing elongate pins to be discharged from an area of relatively low pressure to an area of relatively greater pressure. The discharge assembly includes a duck valve having a lip piece made of flexible material. The flexible lip piece responds to a fluctuating pressure created downstream by an aspirator. The aspirator reduces the downstream pressure sensed by the duck valve when the discharge assembly is in the open position. This allows elongate pins to be moved through the duck valve with no backflow because the aspirator pressure is less than the pressure in the low pressure area from which the pins originate. Closure of the assembly causes the aspirator static pressure to force the flexible duck valve lip piece into a tightly sealed position also preventing backflow. The discharge assembly can be easily controlled using a single control valve which blocks the flow of aspirator gas and closes the pin passageway extending through the assembly.

  10. Differential pressure pin discharge apparatus

    DOEpatents

    Oakley, David J.

    1987-02-03

    Disclosed is a discharge assembly for allowing elongate pins to be discharged from an area of relatively low pressure to an area of relatively greater pressure. The discharge assembly includes a duck valve having a lip piece made of flexible material. The flexible lip piece responds to a fluctuating pressure created downstream by an aspirator. The aspirator reduces the downstream pressure sensed by the duck valve when the discharge assembly is in the open position. This allows elongate pins to be moved through the duck valve with no backflow because the aspirator pressure is less than the pressure in the low pressure area from which the pins originate. Closure of the assembly causes the aspirator static pressure to force the flexible duck valve lip piece into a tightly sealed position also preventing backflow. The discharge assembly can be easily controlled using a single control valve which blocks the flow of aspirator gas and closes the pin passageway extending through the assembly.

  11. Differential pressure pin discharge apparatus

    DOEpatents

    Oakley, D.J.

    1984-05-30

    Disclosed is a discharge assembly for allowing elongate pins to be discharged from an area of relatively low pressure to an area of relatively greater pressure. The discharge assembly includes a duck valve having a lip piece made of flexible material. The flexible lip piece responds to a fluctuating pressure created downstream by an aspirator. The aspirator reduces the downstream pressure sensed by the duck valve when the discharge assembly is in the open position. This allows elongate pins to be moved through the duck valve with no backflow because the aspirator pressure is less than the pressure in the low pressure area from which the pins originate. Closure of the assembly causes the aspirator static pressure to force the flexible duck valve lip piece into a tightly sealed position also preventing backflow. The discharge assembly can be easily controlled using a single control valve which blocks the flow of aspirator gas and closes the pins passageway extending through the assembly.

  12. Internal pressure sensor

    DOEpatents

    Dowalo, James A [Blackfoot, ID

    2010-03-16

    A pressure sensor for sensing changes in pressure in an enclosed vessel may include a first chamber having at least one expandable section therein that allows that first chamber to change in length. A reference member mounted within the first chamber moves as a result of changes in length of the first chamber. A second chamber having an expandable section therein allows the second chamber to change in length in response to changes in pressure in the enclosed vessel. The second chamber is operatively associated with the first chamber so that changes in length of the second chamber result in changes in length of the first chamber. A sensor operatively associated with the reference member detects changes in position of the reference member. Changes in position of the reference member are related to changes in pressure in the enclosed vessel.

  13. Evaluation of the Maximum Allowable Cost Program

    PubMed Central

    Lee, A. James; Hefner, Dennis; Dobson, Allen; Hardy, Ralph

    1983-01-01

    This article summarizes an evaluation of the Maximum Allowable Cost (MAC)-Estimated Acquisition Cost (EAC) program, the Federal Government's cost-containment program for prescription drugs.1 The MAC-EAC regulations which became effective on August 26, 1976, have four major components: (1) Maximum Allowable Cost reimbursement limits for selected multisource or generically available drugs; (2) Estimated Acquisition Cost reimbursement limits for all drugs; (3) “usual and customary” reimbursement limits for all drugs; and (4) a directive that professional fee studies be performed by each State. The study examines the benefits and costs of the MAC reimbursement limits for 15 dosage forms of five multisource drugs and EAC reimbursement limits for all drugs for five selected States as of 1979. PMID:10309857

  14. 10 CFR 600.222 - Allowable costs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... than a hospital and an organization named in OBM Circular A-122 as not subject to that circular 48 CFR... organization named in OMB Circular A-122 as not subject to that circular. 48 CFR 931.2 Hospitals 45 CFR part 74... 10 Energy 4 2010-01-01 2010-01-01 false Allowable costs. 600.222 Section 600.222 Energy...

  15. Astronauts Working in Spacelab

    NASA Technical Reports Server (NTRS)

    1999-01-01

    This Quick Time movie captures astronaut Jan Davis and her fellow crew members working in the Spacelab, a versatile laboratory carried in the Space Shuttle's cargo bay for special research flights. Its various elements can be combined to accommodate the many types of scientific research that can best be performed in space. Spacelab consisted of an enclosed, pressurized laboratory module and open U-shaped pallets located at the rear of the laboratory module. The laboratory module contained utilities, computers, work benches, and instrument racks to conduct scientific experiments in astronomy, physics, chemistry, biology, medicine, and engineering. Equipment, such as telescopes, antennas, and sensors, is mounted on pallets for direct exposure to space. A 1-meter (3.3-ft.) diameter aluminum tunnel, resembling a z-shaped tube, connected the crew compartment (mid deck) to the module. The reusable Spacelab allowed scientists to bring experiment samples back to Earth for post-flight analysis. Spacelab was a cooperative venture of the European Space Agency (ESA) and NASA. ESA was responsible for funding, developing, and building Spacelab, while NASA was responsible for the launch and operational use of Spacelab. Spacelab missions were cooperative efforts between scientists and engineers from around the world. Teams from NASA centers, universities, private industry, government agencies and international space organizations designed the experiments. The Marshall Space Flight Center was NASA's lead center for monitoring the development of Spacelab and managing the program.

  16. Pressure ulcers.

    PubMed

    O'Byrne, Deborah

    2016-04-13

    My nursing experience is in acute care. Acute medical nurses are well placed to assess skin integrity, identify patients at risk of pressure ulcer development, and commence appropriate interventions to prevent or treat pressure ulcers. PMID:27073966

  17. Pressure Sores

    MedlinePlus

    Pressure sores are areas of damaged skin caused by staying in one position for too long. They ... wheelchair, or are unable to change your position. Pressure sores can cause serious infections, some of which ...

  18. Robust technique allowing manufacturing superoleophobic surfaces

    NASA Astrophysics Data System (ADS)

    Bormashenko, Edward; Grynyov, Roman; Chaniel, Gilad; Taitelbaum, Haim; Bormashenko, Yelena

    2013-04-01

    We report the robust technique allowing manufacturing of superhydrophobic and oleophobic (omniphobic) surfaces with industrial grade low density polyethylene. The reported process includes two stages: (1) hot embossing of polyethylene with micro-scaled steel gauzes; (2) treatment of embossed surfaces with cold radiofrequency plasma of tetrafluoromethane. The reported surfaces demonstrate not only pronounced superhydrophobicity but also superoleophobicity. Superoleophobicity results from the hierarchical nano-scaled topography of fluorinated polyethylene surface. The observed superoleophobicity is strengthened by the hydrophobic recovery. The stability of the Cassie wetting regime was studied.

  19. Graphene Membranes for Atmospheric Pressure Photoelectron Spectroscopy.

    PubMed

    Weatherup, Robert S; Eren, Baran; Hao, Yibo; Bluhm, Hendrik; Salmeron, Miquel B

    2016-05-01

    Atmospheric pressure X-ray photoelectron spectroscopy (XPS) is demonstrated using single-layer graphene membranes as photoelectron-transparent barriers that sustain pressure differences in excess of 6 orders of magnitude. The graphene serves as a support for catalyst nanoparticles under atmospheric pressure reaction conditions (up to 1.5 bar), where XPS allows the oxidation state of Cu nanoparticles and gas phase species to be simultaneously probed. We thereby observe that the Cu(2+) oxidation state is stable in O2 (1 bar) but is spontaneously reduced under vacuum. We further demonstrate the detection of various gas-phase species (Ar, CO, CO2, N2, O2) in the pressure range 10-1500 mbar including species with low photoionization cross sections (He, H2). Pressure-dependent changes in the apparent binding energies of gas-phase species are observed, attributable to changes in work function of the metal-coated grids supporting the graphene. We expect atmospheric pressure XPS based on this graphene membrane approach to be a valuable tool for studying nanoparticle catalysis. PMID:27082434

  20. Nanoparticle heating in atmospheric pressure plasmas

    NASA Astrophysics Data System (ADS)

    Kramer, Nicolaas; Aydil, Eray; Kortshagen, Uwe

    2015-09-01

    The plasma environment offers a number of attractive properties that allow for the generation of nanoparticle materials that are otherwise hard to produce by other means. Among these are the generally high temperatures that nanoparticles can attain within plasmas, enabling the generation of nanocrystals of high melting point materials. In low pressure discharges, these high temperatures are the result of energetic surface reactions that strongly heat the small nanoparticles combined with the relatively slow heat transfer to the neutral gas. At atmospheric pressure, the nanoparticle intrinsic temperature is much more closely coupled to the neutral gas temperature. We study the heating of nanoparticles in atmospheric pressure plasmas based on a Monte Carlo simulation that takes into account the most important plasma-surface reactions as well as the conductive cooling of nanoparticles through the neutral gas. We find that, compared to low pressure plasmas, significantly higher plasma densities and densities of reactive species are required in order to achieve nanoparticle temperatures comparable to those in low pressure plasmas. These findings have important implications for the application of atmospheric pressure plasmas for the synthesis of nanoparticle materials. This work was supported by the DOE Plasma Science Center for Predictive Control of Plasma Kinetics.

  1. Pressure Controller

    NASA Astrophysics Data System (ADS)

    1981-01-01

    EPIC is Electronic Pressure Indicating Controller produced by North American Manufacturing Company. It is a high-sensitivity device for improving combustion efficiency in industrial furnaces that interprets a signal from a pressure transducer on a furnace and regulates furnace pressure accordingly. A controller can provide savings of from five to 25 percent of an industrial user's annual furnace fuel bill.

  2. Barometric pressure

    NASA Technical Reports Server (NTRS)

    Billings, C. E.

    1973-01-01

    The effects of alterations in barometric pressure on human beings are described. Human tolerances for gaseous environments and low and high barometric pressure are discussed, including effects on specific areas, such as the ear, lungs, teeth, and sinuses. Problems due to trapped gas within the body, high dynamic pressures on the body, and blasts are also considered.

  3. Effects of yarn crimping on braided composite design allowables

    NASA Technical Reports Server (NTRS)

    Adams, Dan

    1995-01-01

    Braided composite materials are currently being evaluated for wing skin stiffeners on commercial aircraft. These carbon-fiber/epoxy materials allow for low-cost manufacturing while maintaining high strength-to-weight and stiffness-to-weight ratios. The proposed braid architecture consists of axial carbon fiber yarns and braider carbon fiber yarns making 60 deg to 70 deg angles with respect to the axial yarns. These 2-D triaxial braids are produced as long, continuous tubes, which are flattened, cut, and stacked to produce the desired part thickness and shape. When infiltrated with epoxy resin and cured under a compaction pressure, the fiber yarns become crimped, allowing for higher fiber packing. Although high fiber packing is desirable, yarn crimping (especially in the axial fiberyarns) is undesirable. Significant axial yarn crimp angles (greater than 10 deg) have been measured in braided composites. Comparable levels of crimping have been found to produce significant compressive strength reductions in laminated composites consisting of planar fiber sheets. Thus, axial yarn crimping is suspected of producing significant reductions in compressive strength allowables for braided composites. The objective of this research is to quantify the reduction in compressive strength as a function of axial yarn crimp severity. Since crimp severity can be reduced by lowering the compaction pressure during curing, the resulting compressive strengths may be used to determine optimum processing conditions. A 'cure-on-the-loom' manufacturing process was developed to produce braided composites with controlled levels of crimping. This method allowed for controlled levels of tension to be placed on the axial yarns and maintained during the curing process. With increasing tension, the crimp severity in the axial yarns was reduced. Thus, varying crimp severities were produced ranging from conventional levels (greater than 10 deg) to virtually straight axial yarns. Test results indicate

  4. Work Out at Work

    MedlinePlus

    ... exercise into your busy work day. Find 10-minute workout breaks throughout the day. There are a variety of strength, balance, and flexibility exercises you can do right at your desk. The Go4Life website has easy-to-follow directions for all of ...

  5. Spacecraft Maximum Allowable Concentrations for Airborne Contaminants

    NASA Technical Reports Server (NTRS)

    James, John T.

    2008-01-01

    The enclosed table lists official spacecraft maximum allowable concentrations (SMACs), which are guideline values set by the NASA/JSC Toxicology Group in cooperation with the National Research Council Committee on Toxicology (NRCCOT). These values should not be used for situations other than human space flight without careful consideration of the criteria used to set each value. The SMACs take into account a number of unique factors such as the effect of space-flight stress on human physiology, the uniform good health of the astronauts, and the absence of pregnant or very young individuals. Documentation of the values is given in a 5 volume series of books entitled "Spacecraft Maximum Allowable Concentrations for Selected Airborne Contaminants" published by the National Academy Press, Washington, D.C. These books can be viewed electronically at http://books.nap.edu/openbook.php?record_id=9786&page=3. Short-term (1 and 24 hour) SMACs are set to manage accidental releases aboard a spacecraft and permit risk of minor, reversible effects such as mild mucosal irritation. In contrast, the long-term SMACs are set to fully protect healthy crewmembers from adverse effects resulting from continuous exposure to specific air pollutants for up to 1000 days. Crewmembers with allergies or unusual sensitivity to trace pollutants may not be afforded complete protection, even when long-term SMACs are not exceeded. Crewmember exposures involve a mixture of contaminants, each at a specific concentration (C(sub n)). These contaminants could interact to elicit symptoms of toxicity even though individual contaminants do not exceed their respective SMACs. The air quality is considered acceptable when the toxicity index (T(sub grp)) for each toxicological group of compounds is less than 1, where T(sub grp), is calculated as follows: T(sub grp) = C(sub 1)/SMAC(sub 1) + C(sub 2/SMAC(sub 2) + ...+C(sub n)/SMAC(sub n).

  6. A novel device allowing for movement and trapping of particles within loop-shaped channels

    NASA Astrophysics Data System (ADS)

    Hahn, P.; Dual, J.

    2012-05-01

    Resonant excitation of a fluid cavity inside ultrasonic particle manipulation devices leads to standing waves inside the fluid. Acoustic radiation forces, caused by the nonlinear interaction between the time harmonic pressure field and a particle can be used to manipulate particles towards the nodal or anti-nodal planes of the acoustic pressure field. This allows the contactless handling of cells, bacteria or other particles, suggesting a wide range of applications in life science and medical engineering. Most ultrasonic manipulation devices described in the literature utilize reflections at fluid-structure interfaces which create the standing wave. At a given frequency, the nodal planes are fixed since their locations are governed by the geometry of the device. This reduces the suitability of the method for applications that require contactless particle transport over long distances or towards arbitrary positions. In order to overcome the described shortcoming, several methods have been proposed. In this work we introduce a new approach, leveraging circumferential resonances within a loop-shaped fluid waveguide in order to gain full one-dimensional control over the location of nodal planes. Limitations regarding the device geometry and the enclosure materials are discussed and it is described how the position or the velocity of nodal planes can be controlled via amplitude modulation applied on two transducers. Preliminary experimental results illustrate potential applications but they also reveal problems related to the current device design.

  7. 42 CFR 61.8 - Benefits: Stipends; dependency allowances; travel allowances; vacation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Benefits: Stipends; dependency allowances; travel allowances; vacation. 61.8 Section 61.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Regular Fellowships § 61.8 Benefits:...

  8. 42 CFR 61.8 - Benefits: Stipends; dependency allowances; travel allowances; vacation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Benefits: Stipends; dependency allowances; travel allowances; vacation. 61.8 Section 61.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Regular Fellowships § 61.8 Benefits:...

  9. 42 CFR 61.9 - Payments: Stipends; dependency allowances; travel allowances.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Payments: Stipends; dependency allowances; travel allowances. 61.9 Section 61.9 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Regular Fellowships § 61.9 Payments: Stipends;...

  10. 42 CFR 61.9 - Payments: Stipends; dependency allowances; travel allowances.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Payments: Stipends; dependency allowances; travel allowances. 61.9 Section 61.9 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Regular Fellowships § 61.9 Payments: Stipends;...

  11. 42 CFR 61.8 - Benefits: Stipends; dependency allowances; travel allowances; vacation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Benefits: Stipends; dependency allowances; travel allowances; vacation. 61.8 Section 61.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Regular Fellowships § 61.8 Benefits:...

  12. 42 CFR 61.9 - Payments: Stipends; dependency allowances; travel allowances.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Payments: Stipends; dependency allowances; travel allowances. 61.9 Section 61.9 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Regular Fellowships § 61.9 Payments: Stipends;...

  13. 42 CFR 61.8 - Benefits: Stipends; dependency allowances; travel allowances; vacation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Benefits: Stipends; dependency allowances; travel allowances; vacation. 61.8 Section 61.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Regular Fellowships § 61.8 Benefits:...

  14. 42 CFR 61.8 - Benefits: Stipends; dependency allowances; travel allowances; vacation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Benefits: Stipends; dependency allowances; travel allowances; vacation. 61.8 Section 61.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Regular Fellowships § 61.8 Benefits:...

  15. 42 CFR 61.9 - Payments: Stipends; dependency allowances; travel allowances.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Payments: Stipends; dependency allowances; travel allowances. 61.9 Section 61.9 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Regular Fellowships § 61.9 Payments: Stipends;...

  16. 42 CFR 61.9 - Payments: Stipends; dependency allowances; travel allowances.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Payments: Stipends; dependency allowances; travel allowances. 61.9 Section 61.9 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING FELLOWSHIPS Regular Fellowships § 61.9 Payments: Stipends;...

  17. 40 CFR 82.8 - Grant of essential use allowances and critical use allowances.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 17 2011-07-01 2011-07-01 false Grant of essential use allowances and critical use allowances. 82.8 Section 82.8 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Production and Consumption Controls § 82.8 Grant of essential use...

  18. 78 FR 26637 - Federal Travel Regulation (FTR); Relocation Allowance-Relocation Income Tax (RIT) Allowable Tables

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-07

    ... June 25, 2008 (73 FR 35952), specifying that GSA would no longer publish the RIT Allowance tables in... From the Federal Register Online via the Government Publishing Office GENERAL SERVICES ADMINISTRATION Federal Travel Regulation (FTR); Relocation Allowance--Relocation Income Tax (RIT)...

  19. Spacecraft Maximum Allowable Concentrations for Selected Airborne Contaminants. Volume 2

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The National Aeronautics and Space Administration (NASA) is aware of the potential toxicological hazards to humans that might be associated with prolonged spacecraft missions. Despite major engineering advances in controlling the atmosphere within spacecraft, some contamination of the air appears inevitable. NASA has measured numerous airborne contaminants during space missions. As the missions increase in duration and complexity, ensuring the health and well-being of astronauts traveling and working in this unique environment becomes increasingly difficult. As part of its efforts to promote safe conditions aboard spacecraft, NASA requested the National Research Council (NRC) to develop guidelines for establishing spacecraft maximum allowable concentrations (SMACs) for contaminants, and to review SMACs for various space-craft contaminants to determine whether NASA's recommended exposure limits are consistent with the guidelines recommended by the subcommittee. In response to NASA's request, the NRC organized the Subcommittee on Guidelines for Developing Spacecraft Maximum Allowable Concentrations for Space Station Contaminants within the Committee On Toxicology (COT). In the first phase of its work, the subcommittee developed the criteria and methods for preparing SMACs for spacecraft contaminants. The subcommittee's report, entitled Guidelines for Developing Spacecraft Maximum Allowable Concentrations for Space Station Contaminants, was published in 1992. The executive summary of that report is reprinted as Appendix A of this volume. In the second phase of the study, the Subcommittee on Spacecraft Maximum Allowable Concentrations reviewed reports prepared by NASA scientists and contractors recommending SMACs for approximately 35 spacecraft contaminants. The subcommittee sought to determine whether the SMAC reports were consistent with the 1992 guidelines. Appendix B of this volume contains the SMAC reports for 12 chemical contaminants that have been reviewed for

  20. Pressure vessel flex joint

    NASA Technical Reports Server (NTRS)

    Kahn, Jon B. (Inventor)

    1992-01-01

    An airtight, flexible joint is disclosed for the interfacing of two pressure vessels such as between the Space Station docking tunnel and the Space Shuttle Orbiter bulkhead adapter. The joint provides for flexibility while still retaining a structural link between the two vessels required due to the loading created by the internal/external pressure differential. The joint design provides for limiting the axial load carried across the joint to a specific value, a function returned in the Orbiter/Station tunnel interface. The flex joint comprises a floating structural segment which is permanently attached to one of the pressure vessels through the use of an inflatable seal. The geometric configuration of the joint causes the tension between the vessels created by the internal gas pressure to compress the inflatable seal. The inflation pressure of the seal is kept at a value above the internal/external pressure differential of the vessels in order to maintain a controlled distance between the floating segment and pressure vessel. The inflatable seal consists of either a hollow torus-shaped flexible bladder or two rolling convoluted diaphragm seals which may be reinforced by a system of straps or fabric anchored to the hard structures. The joint acts as a flexible link to allow both angular motion and lateral displacement while it still contains the internal pressure and holds the axial tension between the vessels.

  1. CC Pressure Test

    SciTech Connect

    Dixon, K.; /Fermilab

    1990-07-12

    The inner vessel heads including bypass and beam tubes had just been welded into place and dye penetrant checked. The vacuum heads were not on at this time but the vacuum shell was on covering the piping penetrating into the inner vessel. Signal boxes with all feed through boards, the instrumentation box, and high voltage boxes were all installed with their pump outs capped. All 1/4-inch instrumentation lines were terminated at their respective shutoff valves. All vacuum piping used for pumping down the inner vessel was isolated using o-ring sealed blind flanges. PV215A (VAT Series 12), the 4-inch VRC gate valve isolating the cyropump, and the rupture disk had to be removed and replaced with blind flanges before pressurizing due to their pressure limitations. Stresses in plates used as blind flanges were checked using Code calcualtions. Before the CC test, vacuum style blanks and clamps were hydrostatically pressure tested to 150% of the maximum test pressure, 60 psig. The Code inspector and Research Division Safety had all given their approval to the test pressure and procedure prior to filling the vessel with argon. The test was a major success. Based on the lack of any distinguishable pressure drop indicated on the pressure gages, the vessel appeared to be structurally sound throughout the duration of the test (approx. 3 hrs.). A major leak in the instrumentation tubing was discovered at half of the maximum test pressure and was quickly isolated by crimping and capping with a compression fitting. There were some slight deviations in the actual procedure used. The 44 psig relief valve located just outside the cleanroom had to be capped until the pressure in the vessel indicated 38 psi. This was to allow higher supply pressures and hence, higher flows through the pressurizing line. Also, in order to get pressure readings at the cryostat without exposing any personnel to the potentially dangerous stored energy near the maximum test pressure, a camera was installed

  2. Arterial Pressure Analog.

    ERIC Educational Resources Information Center

    Heusner, A. A.; Tracy, M. L.

    1980-01-01

    Describes a simple hydraulic analog which allows students to explore some physical aspects of the cardiovascular system and provides them with a means to visualize and conceptualize these basic principles. Simulates the behavior of arterial pressure in response to changes in heart rate, stroke volume, arterial compliance, and peripheral…

  3. Cluster approach allows budgeting, planning with DRGs.

    PubMed

    Grimaldi, P L

    1984-01-01

    Measuring costs and revenues on a diagnosis related group (DRG) basis allows health care managers to define product lines, identify market shares, and examine the effects of case mix and physician behavior on profitability. It also enables public agencies to predict bed needs and evaluate certificate-of-need applications. The large number of DRGs, however, and other managerial considerations may discourage the use of DRG-based budgeting and planning. To save time and enhance data usefulness, financial officers may consolidate the DRGs into fewer groups. Revenue, for example, can be estimated by grouping the DRGs into 23 major diagnostic categories or by clustering them according to cost weight or into one group. Comparisons of payment rates and costs will identify the DRGs that lose money and will determine whether departmental costs are excessive. Strategic planning units formed from the 468 DRGs will help health care managers analyze and project performance. Product lines for this purpose may be clustered according to major diagnostic category, physician specialty, or clinical department. Since a potentially enormous amount of DRG-based clinical and financial information could be generated, hospitals should create data committees to ensure that managers receive only the information they need. PMID:10310693

  4. Serial FBG sensor network allowing overlapping spectra

    NASA Astrophysics Data System (ADS)

    Abbenseth, S.; Lochmann, S.; Ahrens, A.; Rehm, B.

    2016-05-01

    For structure or material monitoring low impact serial fiber Bragg grating (FBG) networks have attracted increasing research interest. Common sensor networks using wavelength division multiplexing (WDM) for FBG interrogation are limited in their efficiency by the spectral width of their light source, the FBG tuning range and the spectral guard bands. Overlapping spectra are strictly forbidden in this case. Applying time division multiplexing (TDM) or active resonator schemes may overcome these restrictions. However, they introduce other substantial disadvantages like signal roundtrip dependency or sophisticated control of active resonating structures. Code division multiplexing (CDM) as a means of FBG interrogation by simple autocorrelation of appropriate codes has been shown to be superior in this respect. However, it came at the cost of a second spectrometer introducing additional equalization efforts. We demonstrate a new serial FBG sensor network utilizing CDM signal processing for efficient sensor interrogation without the need of a second spectrometer and additional state of polarization (SOP) controlling components. It allows overlapping spectra even when all sensing FBGs are positioned at the same centre wavelength and it shows a high degree of insensitivity to SOP. Sequence inversed keyed (SIK) serial signal processing utilizing quasi-orthogonal balanced codes ensures simple and quick sensor interrogation with high signal-to-interference/noise ratio.

  5. Domestic atmospheric pressure thermal deaerators

    NASA Astrophysics Data System (ADS)

    Egorov, P. V.; Gimmelberg, A. S.; Mikhailov, V. G.; Baeva, A. N.; Chuprakov, M. V.; Grigoriev, G. V.

    2016-04-01

    Based on many years of experience and proven technical solutions, modern atmospheric pressure deaerators of the capacity of 0.4 to 800 t/h were designed and developed. The construction of such deaerators is based on known and explored technical solutions. A two-stage deaeration scheme is applied where the first stage is a jet dripping level (in a column) and the second one is a bubble level (in a tank). In the design of deaeration columns, low-pressure hydraulic nozzles (Δ p < 0.15 MPa) and jet trays are used, and in deaerator tank, a developed "flooded" sparger is applied, which allows to significantly increase the intensity of the heat and mass exchange processes in the apparatus. The use of the two efficient stages in a column and a "flooded" sparger in a tank allows to reliably guarantee the necessary water heating and deaeration. Steam or "superheated" water of the temperature of t ≥ 125°C can be used as the coolant in the deaerators. The commissioning tests of the new deaerator prototypes of the capacity of 800 and 500 t/h in the HPP conditions showed their sustainable, reliable, and efficient work in the designed range of hydraulic and thermal loads. The content of solved oxygen and free carbon dioxide in make-up water after deaerators meets the requirements of State Standard GOST 16860-88, the operating rules and regulations, and the customer's specifications. Based on these results, the proposals were developed on the structure and the design of deaerators of the productivity of more than 800 t/h for the use in circuits of large heating systems and the preparation of feed water to the TPP at heating and industrial-heating plants. The atmospheric pressure thermal deaerators developed at NPO TsKTI with consideration of the current requirements are recommended for the use in water preparation schemes of various power facilities.

  6. Integrating Spirituality Into Work

    ERIC Educational Resources Information Center

    Wax, Seth

    2008-01-01

    School leaders do work that is both demanding and draining. Amid the day-to-day pressures of managing their school districts, many are seeking inspiration and deeper meaning. As a result, some are increasingly looking to integrate their spirituality and their work. In this article, the author describes three individuals interviewed as part of the…

  7. Back to Work

    ERIC Educational Resources Information Center

    Fernandez, Kim

    2010-01-01

    The economic downturn hit working America particularly hard, as agricultural, automotive, manufacturing, and retail jobs in many corners of the country all but evaporated. Consumers continue to cut back, and jobless rates in many states have eclipsed levels not seen in decades. Out of work and under pressure, many Americans are turning to the…

  8. A new method for determining allowable medium temperature during transient operation of thick-walled elements in a supercritical power plant

    NASA Astrophysics Data System (ADS)

    Duda, Piotr; Rząsa, Dariusz

    2010-09-01

    Construction elements of supercritical power plants are subjected to high working pressures and high temperatures while operating. Under these conditions high stresses in the construction are created. In order to operate safely, it is important to monitor stresses, especially during start-up and shut-down processes. The maximum stresses in the construction elements should not exceed the allowable stress limit. The goal is to find optimum operating parameters that can assure safe heating and cooling processes [1-5]. The optimum parameters should guarantee that the allowable stresses are not exceeded and the entire process is conducted in the shortest time. In this work new numerical method for determining optimum working parameters is presented. Based on these parameters heating operations were conducted. Stresses were monitored during the entire processes. The results obtained were compared with the German boiler regulations - Technische Regeln für Dampfkessel 301.

  9. Assessing allowable take of migratory birds

    USGS Publications Warehouse

    Runge, M.C.; Sauer, J.R.; Avery, M.L.; Blackwell, B.F.; Koneff, M.D.

    2009-01-01

    Legal removal of migratory birds from the wild occurs for several reasons, including subsistence, sport harvest, damage control, and the pet trade. We argue that harvest theory provides the basis for assessing the impact of authorized take, advance a simplified rendering of harvest theory known as potential biological removal as a useful starting point for assessing take, and demonstrate this approach with a case study of depredation control of black vultures (Coragyps atratus) in Virginia, USA. Based on data from the North American Breeding Bird Survey and other sources, we estimated that the black vulture population in Virginia was 91,190 (95% credible interval = 44,520?212,100) in 2006. Using a simple population model and available estimates of life-history parameters, we estimated the intrinsic rate of growth (rmax) to be in the range 7?14%, with 10.6% a plausible point estimate. For a take program to seek an equilibrium population size on the conservative side of the yield curve, the rate of take needs to be less than that which achieves a maximum sustained yield (0.5 x rmax). Based on the point estimate for rmax and using the lower 60% credible interval for population size to account for uncertainty, these conditions would be met if the take of black vultures in Virginia in 2006 was <3,533 birds. Based on regular monitoring data, allowable harvest should be adjusted annually to reflect changes in population size. To initiate discussion about how this assessment framework could be related to the laws and regulations that govern authorization of such take, we suggest that the Migratory Bird Treaty Act requires only that take of native migratory birds be sustainable in the long-term, that is, sustained harvest rate should be

  10. Spacecraft maximum allowable concentrations for selected airborne contaminants, volume 1

    NASA Technical Reports Server (NTRS)

    1994-01-01

    As part of its efforts to promote safe conditions aboard spacecraft, NASA requested the National Research Council (NRC) to develop guidelines for establishing spacecraft maximum allowable concentrations (SMAC's) for contaminants, and to review SMAC's for various spacecraft contaminants to determine whether NASA's recommended exposure limits are consistent with the guidelines recommended by the subcommittee. In response to NASA's request, the NRC organized the Subcommittee on Guidelines for Developing Spacecraft Maximum Allowable Concentrations for Space Station Contaminants within the Committee on Toxicology (COT). In the first phase of its work, the subcommittee developed the criteria and methods for preparing SMAC's for spacecraft contaminants. The subcommittee's report, entitled Guidelines for Developing Spacecraft Maximum Allowable Concentrations for Space Station Contaminants, was published in 1992. The executive summary of that report is reprinted as Appendix A of this volume. In the second phase of the study, the Subcommittee on Spacecraft Maximum Allowable Concentrations reviewed reports prepared by NASA scientists and contractors recommending SMAC's for 35 spacecraft contaminants. The subcommittee sought to determine whether the SMAC reports were consistent with the 1992 guidelines. Appendix B of this volume contains the first 11 SMAC reports that have been reviewed for their application of the guidelines developed in the first phase of this activity and approved by the subcommittee.

  11. Spacecraft Maximum Allowable Concentrations for Selected Airborne Contaminants. Volume 3

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The National Aeronautics and Space Administration (NASA) is aware of the potential toxicological hazards to humans that might be associated with prolonged spacecraft missions. Despite major engineering advances in controlling the atmosphere within spacecraft, some contamination of the air appears inevitable. NASA has measured numerous airborne contaminants during space missions. As the missions increase in duration and complexity, ensuring the health and well-being of astronauts traveling and working in this unique environment becomes increasingly difficult. As part of its efforts to promote safe conditions aboard spacecraft, NASA requested the National Research Council (NRC) to develop guidelines for establishing Spacecraft Maximum Allowable Concentrations (SMAC's) for contaminants, and to review SMAC's for various spacecraft contaminants to determine whether NASA's recommended exposure limits are consistent with the guidelines recommended by the subcommittee. In response to this request, the NRC first developed criteria and methods for preparing SMAC's for spacecraft contaminants, published in its 1992 report Guidelines for Developing Spacecraft Maximum Allowable Concentrations for Space Station Contaminants. Since then, the Subcommittee on Spacecraft Maximum Allowable Concentrations has been reviewing NASA's documentation of chemical-specific SMAC's as described in the Introduction to this volume. This report is the third volume in the series Spacecraft Maximum Allowable Concentrations for Space Station Contaminants. The first volume was published in 1994 and the second in 1996.

  12. Working Out Works for Shawn Kelly | Poster

    Cancer.gov

    By Nancy Parrish, Staff Writer When Shawn Kelly found out last year that he had high blood pressure, he was determined to do something about it. Luckily for Kelly, an instrumentation technician III, Facilities Maintenance and Engineering, he works at the Advanced Technology Research Facility (ATRF), where he can take advantage of the gym there, known as the Wellness Center.

  13. Proactive life extension of pressure vessels

    NASA Astrophysics Data System (ADS)

    Mager, Lloyd

    1998-03-01

    For a company to maintain its competitive edge in today's global market every opportunity to gain an advantage must be exploited. Many companies are strategically focusing on improved utilization of existing equipment as well as regulatory compliance. Abbott Laboratories is no exception. Pharmaceutical companies such as Abbott Laboratories realize that reliability and availability of their production equipment is critical to be successful and competitive. Abbott Laboratories, like many of our competitors, is working to improve safety, minimize downtime and maximize the productivity and efficiency of key production equipment such as the pressure vessels utilized in our processes. The correct strategy in obtaining these objectives is to perform meaningful inspection with prioritization based on hazard analysis and risk. The inspection data gathered in Abbott Laboratories pressure vessel program allows informed decisions leading to improved process control. The results of the program are reduced risks to the corporation and employees when operating pressure retaining equipment. Accurate and meaningful inspection methods become the cornerstone of a program allowing proper preventative maintenance actions to occur. Successful preventative/predictive maintenance programs must utilize meaningful nondestructive evaluation techniques and inspection methods. Nondestructive examination methods require accurate useful tools that allow rapid inspection for the entire pressure vessel. Results from the examination must allow the owner to prove compliance of all applicable regulatory laws and codes. At Abbott Laboratories the use of advanced NDE techniques, primarily B-scan ultrasonics, has provided us with the proper tools allowing us to obtain our objectives. Abbott Laboratories uses B-scan ultrasonics utilizing a pulse echo pitch catch technique to provide essential data on our pressure vessels. Equipment downtime is reduced because the nondestructive examination usually takes

  14. 49 CFR 192.620 - Alternative maximum allowable operating pressure for certain steel pipelines.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... paragraph (d)(11)(ii) or (iii) of this section to determine its growth rate, set the maximum interval for...) Develop and implement a plan to monitor for and mitigate occurrences of unstable soil and ground movement...) Locate pipe-to-soil test stations at half-mile intervals within each high consequence area ensuring...

  15. 49 CFR 192.620 - Alternative maximum allowable operating pressure for certain steel pipelines.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... paragraph (d)(11)(ii) or (iii) of this section to determine its growth rate, set the maximum interval for...) Develop and implement a plan to monitor for and mitigate occurrences of unstable soil and ground movement...) Locate pipe-to-soil test stations at half-mile intervals within each high consequence area ensuring...

  16. 49 CFR 192.620 - Alternative maximum allowable operating pressure for certain steel pipelines.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... paragraph (d)(11)(ii) or (iii) of this section to determine its growth rate, set the maximum interval for...) Develop and implement a plan to monitor for and mitigate occurrences of unstable soil and ground movement...) Locate pipe-to-soil test stations at half-mile intervals within each high consequence area ensuring...

  17. 49 CFR 192.620 - Alternative maximum allowable operating pressure for certain steel pipelines.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... analysis, including metallurgical examination of the failed pipe. The results of this root cause analysis... the following additional step: (1) Identifying and evaluating threats Develop a threat...

  18. 49 CFR 192.620 - Alternative maximum allowable operating pressure for certain steel pipelines.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... analysis, including metallurgical examination of the failed pipe. The results of this root cause analysis... the following additional step: (1) Identifying and evaluating threats Develop a threat...

  19. Pressure-Directed Assembly: Nanostructures Made Easy

    NASA Astrophysics Data System (ADS)

    Fan, Hongyou

    Precise control of structural parameters through nanoscale engineering to improve optical and electronic properties of functional nanomaterials continuously remains an outstanding challenge. Previous work has been conducted largely at ambient pressure and relies on specific chemical or physical interactions such as van der Waals interactions, dipole-dipole interactions, chemical reactions, ligand-receptor interactions, etc. In this presentation, I will introduce a new pressure-directed assembly method that uses mechanical compressive force applied to nanoparticle arrays to induce structural phase transition and to consolidate new nanomaterials with precisely controlled structures and tunable properties. By manipulating nanoparticle coupling through external pressure, instead of through chemistry, a reversible change in their assemblies and properties can be achieved and demonstrated. In addition, over a certain threshold, the external pressure will force these nanoparticles into contact, thereby allowing the formation and consolidation of one- to three-dimensional nanostructures. Through pressure induced nanoparticle assembly, materials engineering and synthesis become remarkably flexible without relying on traditional crystallization process where atoms/ions are locked in a specific crystal structure. Therefore, morphology or architecture can be readily tuned to produce desirable properties for practical applications. Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under Contract DE-AC04-94AL85000.

  20. Computational Analyses of Pressurization in Cryogenic Tanks

    NASA Technical Reports Server (NTRS)

    Ahuja, Vineet; Hosangadi, Ashvin; Mattick, Stephen; Lee, Chun P.; Field, Robert E.; Ryan, Harry

    2008-01-01

    A) Advanced Gas/Liquid Framework with Real Fluids Property Routines: I. A multi-fluid formulation in the preconditioned CRUNCH CFD(Registered TradeMark) code developed where a mixture of liquid and gases can be specified: a) Various options for Equation of state specification available (from simplified ideal fluid mixtures, to real fluid EOS such as SRK or BWR models). b) Vaporization of liquids driven by pressure value relative to vapor pressure and combustion of vapors allowed. c) Extensive validation has been undertaken. II. Currently working on developing primary break-up models and surface tension effects for more rigorous phase-change modeling and interfacial dynamics B) Framework Applied to Run-time Tanks at Ground Test Facilities C) Framework Used For J-2 Upper Stage Tank Modeling: 1) NASA MSFC tank pressurization: a) Hydrogen and oxygen tank pre-press, repress and draining being modeled at NASA MSFC. 2) NASA AMES tank safety effort a) liquid hydrogen and oxygen are separated by a baffle in the J-2 tank. We are modeling pressure rise and possible combustion if a hole develops in the baffle and liquid hydrogen leaks into the oxygen tank. Tank pressure rise rates simulated and risk of combustion evaluated.