Sample records for analysis implementation plan

  1. Handbook for Educational Buildings Planning. Educational Building and Equipment 9.

    ERIC Educational Resources Information Center

    Almeida, Rodolfo

    Stages in the educational facility planning process are presented in this handbook, with a second focus on implementation. Four chapters provide information on the four cycles of the planning process, which include analysis and diagnosis, research and development, planning and programming, and implementation and evaluation. Characteristics of an…

  2. Planning for strategic change? A participative planning approach for community hospitals.

    PubMed

    MacDonald, S K; Beange, J E; Blachford, P C

    1992-01-01

    Strategic planning is becoming to hospitals what business case analysis is to private corporations. In fact, this type of planning is becoming essential for the professional management of Ontario hospitals. The participative strategic planning process at Toronto East General Hospital (TEGH) is an example of how a professionally structured and implemented strategic planning process can be successfully developed and implemented in a community hospital. In this article, the environmental factors driving planning are reviewed and the critical success factors for the development and implementation of a strategic plan are examined in the context of TEGH's experience.

  3. Implementation of green infrastructure concept in Citarum Watershed

    NASA Astrophysics Data System (ADS)

    Maryati, Sri; Humaira, An Nisaa'Siti

    2017-03-01

    Green infrastructure has several benefits compared to grey infrastructure in term of environmental services and sustainability, such as reducing energy consumption, improving air quality, providing carbon sequestration, and increasing property values. Nevertheless in practice, the implementation of the concept in Indonesia is still limited. Implementation of the certain concept has to be guided in planning document. In this paper, green infrastructure concept in the current spatial plan and other planning documents is assessed. The purpose of this research is to figure out how far the green infrastructure concept is integrated into planning system, based on the analysis of planning documents in Citarum Watershed and expert interviews with local stakeholders. Content analysis method is used to analyze the documents and result of interview. The result shows that green infrastructure concept has not been accommodated in spatial plan or other planning documents widely. There are some challenges in implementing the concept including reward and punishment system (incentive and disincentive), coordination, and lack of human resources.

  4. Setting Strategic Directions Using Critical Success Factors.

    ERIC Educational Resources Information Center

    Bourne, Bonnie; Gates, Larry; Cofer, James

    2000-01-01

    Describes implementation of a system-level planning model focused on institutional improvement and effectiveness at the University of Missouri. Details implementation of three phases of the strategic planning model (strategic analysis, strategic thinking/decision-making, and campus outreach/systems administration planning); identifies critical…

  5. Chicago-St. Louis high speed rail plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stead, M.E.

    1994-12-31

    The Illinois Department of Transportation (IDOT), in cooperation with Amtrak, undertook the Chicago-St. Louis High Speed Rail Financial and Implementation Plan study in order to develop a realistic and achievable blueprint for implementation of high speed rail in the Chicago-St. Louis corridor. This report presents a summary of the Price Waterhouse Project Team`s analysis and the Financial and Implementation Plan for implementing high speed rail service in the Chicago-St. Louis corridor.

  6. 77 FR 29270 - Approval and Promulgation of Implementation Plans; State of Montana; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-17

    ... by Holcim for Trident Cement Plant, Three Forks, MT (``Holcim Initial Response'') (July 6, 2007); Responses to EPA comments on BART analysis for Trident Cement Plant (``Holcim 2008 Responses'') (Jan. 25, 2008); BART analysis by Holcim for low NO X burners for Trident Cement Plant (``Holcim Additional...

  7. RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Annette L. Schafer

    2012-06-01

    A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses. The plan addressed the potential for gaps to exist in themore » following areas: • Department of Energy Order 435.1, “Radioactive Waste Management,” requirements, including the performance assessment, composite analysis, monitoring plan, performance assessment/composite analysis maintenance plan, and closure plan • Environmental assessment supporting the National Environmental Policy Act • Nuclear safety • Safeguards and security • Emplacement operations • Requirements for commissioning • General project implementation. The reconciliation plan and results of the plan implementation are provided in a business-sensitive project file. This report provides the reconciliation plan and non-business sensitive summary responses to identified gaps.« less

  8. Implementation of Head Start Planned Variation: 1970-1971. Part II.

    ERIC Educational Resources Information Center

    Lukas, Carol Van Deusen; Wohlleb, Cynthia

    This volume of appendices is Part II of a study of program implementation in 12 models of Head Start Planned Variation. It presents details of the data analysis, copies of data collection instruments, and additional analyses and statistics. The appendices are: (A) Analysis of Variance Designs, (B) Copies of Instruments, (C) Additional Analyses,…

  9. Nurse manager succession planning: A cost-benefit analysis.

    PubMed

    Phillips, Tracy; Evans, Jennifer L; Tooley, Stephanie; Shirey, Maria R

    2018-03-01

    This commentary presents a cost-benefit analysis to advocate for the use of succession planning to mitigate the problems ensuing from nurse manager turnover. An estimated 75% of nurse managers will leave the workforce by 2020. Many benefits are associated with proactively identifying and developing internal candidates. Fewer than 7% of health care organisations have implemented formal leadership succession planning programmes. A cost-benefit analysis of a formal succession-planning programme from one hospital illustrates the benefits of the programme in their organisation and can be replicated easily. Assumptions of nursing manager succession planning cost-benefit analysis are identified and discussed. The succession planning exemplar demonstrates the integration of cost-benefit analysis principles. Comparing the costs of a formal nurse manager succession planning strategy with the status quo results in a positive cost-benefit ratio. The implementation of a formal nurse manager succession planning programme effectively reduces replacement costs and time to transition into the new role. This programme provides an internal pipeline of future leaders who will be more successful than external candidates. Using an actual cost-benefit analysis equips nurse managers with valuable evidence depicting succession planning as a viable business strategy. © 2017 John Wiley & Sons Ltd.

  10. National Voice Response System (VRS) Implementation Plan Alternatives Study

    DOT National Transportation Integrated Search

    1979-07-01

    This study examines the alternatives available to implement a national Voice Response System (VRS) for automated preflight weather briefings and flight plan filing. Four major hardware configurations are discussed. A computerized analysis model was d...

  11. Organizational Responses to External Demands: Strategies Employed by Superintendents in Developing and Implementing State Mandated Improvement Plans.

    ERIC Educational Resources Information Center

    Wills, Frances G.

    Strategies utilized by district superintendents to implement school improvement plans in response to state-mandated change are examined in this report. Methodology involved document analysis of written plans and interviews with 30 Maine superintendents and assistant superintendents who were identified as successful developers of school improvement…

  12. 21 CFR 123.6 - Hazard analysis and Hazard Analysis Critical Control Point (HACCP) plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 2 2012-04-01 2012-04-01 false Hazard analysis and Hazard Analysis Critical Control Point (HACCP) plan. 123.6 Section 123.6 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF... processor shall have and implement a written HACCP plan whenever a hazard analysis reveals one or more food...

  13. 21 CFR 123.6 - Hazard analysis and Hazard Analysis Critical Control Point (HACCP) plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Hazard analysis and Hazard Analysis Critical Control Point (HACCP) plan. 123.6 Section 123.6 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF... processor shall have and implement a written HACCP plan whenever a hazard analysis reveals one or more food...

  14. Challenges experienced by nurses in the implementation of a healthcare reform plan in Iran.

    PubMed

    Salarvand, Shahin; Azizimalekabadi, Maryam; Jebeli, Azadeh Akbari; Nazer, Mohamadreza

    2017-04-01

    The Healthcare Reform Plan is counted as a plan for improving healthcare services in Iran. Undoubtedly pros and cons can be seen either in plan or implementation. This study was conducted to describe nurses' challenges in implementing healthcare reform in Iran. A qualitative method centered upon conventional content analysis was applied. We used purposive sampling and data saturation was obtained by 30 participants. Data were analyzed using MAXQDA software. Challenges experienced by nurses in the implementation of this reform include; unsuitable infrastructure, unfavorable vision, a complicated challenge, the necessity of monitoring, control plan outcomes, the impact on nurses, people's misconceptions and solutions. The Healthcare Reform Plan in Iran is a solution to establish equality in the health system, however, to eliminate these challenges, revision and appropriate foundation of infrastructures is called for.

  15. Analysis of strategic plans to assess planning for sustainability of comprehensive community initiatives.

    PubMed

    Sridharan, Sanjeev; Go, Sodam; Zinzow, Heidi; Gray, Aracelis; Barrett, Melissa Gutierrez

    2007-02-01

    In order to achieve the intended impact on a community, comprehensive community initiatives must sustain programs once they have been implemented. However, planning for sustainability is challenging and is rarely incorporated in the planning process of an initiative. The current study examined 19 5-year plans developed during the planning phase of the Comprehensive Strategy for Serious, Violent and Chronic Juvenile Offenders. Quantitative and qualitative methods were employed to assess the extent to which the construct of sustainability was incorporated. The plan analysis was supplemented with results from other components of the complex evaluation design implemented as part of the process evaluation of Comprehensive Strategy. Results suggested that sustainability was not accounted for during the planning phase of this initiative. The implications of these findings, including the importance of planning for sustainability in order to achieve sustainability, are discussed.

  16. Acting Out the Great Books: A Case Study of How the Implemented Curriculum Can Differ from the Planned Curriculum.

    ERIC Educational Resources Information Center

    Wortham, Stanton

    This paper reports on a study of the complex ways a planned curriculum can get transformed in practice. The analysis also illustrates how the implemented curriculum can have moral and political significance, in ways that critics of the planned curriculum might not foresee. "Participant example," an actual or hypothetical event in which…

  17. Status of health sector strategic plans in five countries of the WHO African Region.

    PubMed

    Barry, S P; Sambo, L G; Bakeera, S; Kirigia, J M; Diarra-Nama, A J

    2009-01-01

    To assess the adequacy of the existing strategic plans and compare the format and content of health sector strategic plans with the guidelines in selected countries of the African region. The health strategic plans for Gambia, Liberia, Malawi, Tanzania and Uganda, which are kept at the WHO/AFRO, were reviewed. All health strategic plans among the Anglophone countries (Gambia, Ghana, Kenya, Liberia, Malawi, Mauritius, Tanzania, Uganda, Zambia and Zimbabwe) that were developed after the year 2000 were eligible for inclusion. Fifty percent of these countries that fitted this criterion were randomly selected. They included Gambia, Liberia, Malawi, Tanzania and Uganda. The analysis framework used in the review included situation analysis; an assessment of appropriateness of strategies that are selected; well developed indicators for each strategy; the match between the service and outcomes targets with available resources; and existence of a clear framework for partnership engagement for implementation. Most of the strategic plans identify key ill health conditions and their contributing factors. Health service and resource gaps are described but not quantified in the Botswana, Gambia, Malawi, Tanzania strategic documents. Most of the plans selected strategies that related to the situational analysis. Generally, countries' plans had clear indicators. Matching service and outcome targets to available resources was the least addressed area in majority of the plans. Most of the strategic plans identified stakeholders and acknowledged their participation in the implementation, providing different levels of comprehensiveness. Some of the areas that are well addressed according to the analysis framework included: addressing the strategic concerns of the health policies; identifying key partners for implementation; and selection of appropriate strategies. The following areas needed more emphasis: quantification of health system gaps; setting targets that are cognisant of the local resource base; and being more explicit in what stakeholders' roles are during the implementation period.

  18. Development Plans in Turkey and a Managerial Analysis on Education (1963-2013 Years)

    ERIC Educational Resources Information Center

    Çakir, Rahman

    2015-01-01

    The purpose of this study is that to evaluate nine educational management plans between the years 1963-2013 and one plan in the process of implementation educational management. Document analysis technique from the qualitative research methods was used in this research. Data was analyzed as three stages: description, analysis and interpretation.…

  19. Cost-Benefit Analysis of the Officer Career Information and Planning System

    DTIC Science & Technology

    1980-08-01

    information without the use of a computer. - vii COST-BENEFIT ANALYSIS OF THE OFFICER CAREER INFOýKATTON AND PLANNING SYSTEM CONTENTS Page INTRODUCTION ...OF THE OFFICER CAREER INFORMATION AND PLANNING SYSTEM INTRODUCTION The implementation of the Officer Personnel Management System (OPMS) has...Research Report 1256 I / COST-BENEFIT ANALYSIS OF THE OFFICER CAREER INFORMATION AND PLANNING SYSTEM Roger A. Myers, Peter C. Cairo, K - Jon A

  20. Challenges experienced by nurses in the implementation of a healthcare reform plan in Iran

    PubMed Central

    Salarvand, Shahin; Azizimalekabadi, Maryam; Jebeli, Azadeh Akbari; Nazer, Mohamadreza

    2017-01-01

    Introduction The Healthcare Reform Plan is counted as a plan for improving healthcare services in Iran. Undoubtedly pros and cons can be seen either in plan or implementation. This study was conducted to describe nurses’ challenges in implementing healthcare reform in Iran. Methods A qualitative method centered upon conventional content analysis was applied. We used purposive sampling and data saturation was obtained by 30 participants. Data were analyzed using MAXQDA software. Results Challenges experienced by nurses in the implementation of this reform include; unsuitable infrastructure, unfavorable vision, a complicated challenge, the necessity of monitoring, control plan outcomes, the impact on nurses, people’s misconceptions and solutions. Conclusions The Healthcare Reform Plan in Iran is a solution to establish equality in the health system, however, to eliminate these challenges, revision and appropriate foundation of infrastructures is called for. PMID:28607646

  1. DOD Product Support Business Case Analysis Guidebook

    DTIC Science & Technology

    2011-04-01

    Mitigation Plans ................................................................................................ 30 4.8 Sensitivity Analysis...Product Support BCA concludes with a recommendation and associated specific actions and an implementation plan to achieve stated organizational...primary executer of the actions and recommendations derived out of the BCA. Within the program office, the PSM has the responsibility to plan

  2. Urban family physician plan in Iran: challenges of implementation in Kerman.

    PubMed

    Dehnavieh, Reza; Kalantari, Ali Reza; Jafari Sirizi, Mohammad

    2015-01-01

    The Family Physician Plan has recently been implemented in three provinces of Iran on a pilot basis and is going to be implemented throughout Iran in the future. Through a qualitative design, this study aims to determine probable implementation challenges of Family Physician Plan in Kerman. This study was conducted in Kerman in 2013. Data were collected through interviews with 21 experts in the field. Sampling continued until data saturation level was achieved. All interviews were recorded and then analyzed, and main themes and subgroups were extracted from them based on a framework analysis model. most prevalent establishment challenges of Family Physician Plan were classified into policy-making, financial supply, laws and resources. The urban Family Physician Plan can be carried out more effectively by implementing this plan step by step, highlighting the relationships between the related organizations, using new payment mechanisms e.g Per Capita, DRG, make national commitment and proper educational programs for providers, development the health electronic Record, justifying providers and community about advantages of this plan, clarifying regulatory status about providers' Duties and most importantly considering a specific funding source.

  3. Healthcare Managers' Experiences of Leading the Implementation of Video Conferencing in Discharge Planning Sessions: An Interview Study.

    PubMed

    Hofflander, Malin; Nilsson, Lina; Eriksén, Sara; Borg, Christel

    2016-03-01

    This article describes healthcare managers' experiences of leading the implementation of video conferencing in discharge planning sessions as a new tool in everyday practice. Data collection took place through individual interviews and the interviews were analyzed using qualitative content analysis with an inductive approach. The results indicate that managers identified two distinct leadership perspectives when they reflected on the implementation process. They described a desired way of leading the implementation and communicating about the upcoming change, understanding and securing support for decisions, as well as ensuring that sufficient time is available throughout the change process. They also, however, described how they perceived that the implementation process was actually taking place, highlighting the lack of planning and preparation as well as the need for support and to be supportive, and having the courage to adopt and lead the implementation. It is suggested that managers at all levels require more information and training in how to encourage staff to become involved in designing their everyday work and in the implementation process. Managers, too, need ongoing organizational support for good leadership throughout the implementation of video conferencing in discharge planning sessions, including planning, start-up, implementation, and evaluation.

  4. Risk assessment for enterprise resource planning (ERP) system implementations: a fault tree analysis approach

    NASA Astrophysics Data System (ADS)

    Zeng, Yajun; Skibniewski, Miroslaw J.

    2013-08-01

    Enterprise resource planning (ERP) system implementations are often characterised with large capital outlay, long implementation duration, and high risk of failure. In order to avoid ERP implementation failure and realise the benefits of the system, sound risk management is the key. This paper proposes a probabilistic risk assessment approach for ERP system implementation projects based on fault tree analysis, which models the relationship between ERP system components and specific risk factors. Unlike traditional risk management approaches that have been mostly focused on meeting project budget and schedule objectives, the proposed approach intends to address the risks that may cause ERP system usage failure. The approach can be used to identify the root causes of ERP system implementation usage failure and quantify the impact of critical component failures or critical risk events in the implementation process.

  5. 75 FR 23640 - Approval and Promulgation of Implementation Plans; New York Reasonably Available Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... Promulgation of Implementation Plans; New York Reasonably Available Control Technology and Reasonably Available... 25, 2009, the EPA proposed to disapprove portions of a proposed revision to the New York State.... Specifically, EPA proposed to disapprove New York's reasonably available control measure analysis and New York...

  6. Opportunity costs of implementing forest plans

    NASA Astrophysics Data System (ADS)

    Fox, Bruce; Keller, Mary Anne; Schlosberg, Andrew J.; Vlahovich, James E.

    1989-01-01

    Intellectual concern with the National Forest Management Act of 1976 has followed a course emphasizing the planning aspects of the legislation associated with the development of forest plans. Once approved, however, forest plans must be implemented. Due to the complex nature of the ecological systems of interest, and the multiple and often conflicting desires of user clientele groups, the feasibility and costs of implementing forest plans require immediate investigation. For one timber sale on the Coconino National Forest in Arizona, forest plan constraints were applied and resulting resource outputs predicted using the terrestrial ecosystem analysis and modeling system (TEAMS), a computer-based decision support system developed at the School of Forestry, Northern Arizona University, With forest plan constraints for wildlife habitat, visual diversity, riparian area protection, and soil and slope harvesting restrictions, the maximum timber harvest obtainable was reduced 58% from the maximum obtainable without plan constraints.

  7. QUALITY SYSTEMS AND IMPLEMENTATION PLAN FOR A PILOT STUDY OF CHILDREN'S TOTAL EXPOSURE TO PERSISTENT PESTICIDES AND OTHER PERSISTENT ORGANIC PESTICIDES (CTEPP)

    EPA Science Inventory

    The Quality System Implementation Plan (QSIP) describes the quality assurance and quality control procedures developed for the CTEPP study. It provides the QA/QC procedures used in recruitment of subjects, sample field collection, sample extraction and analysis, data storage, and...

  8. 78 FR 28744 - Approval and Promulgation of Implementation Plans; Georgia; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... update the Georgia SIP to reflect EPA's current national ambient air quality standards (NAAQS) for sulfur...'s rules identifying the current NAAQS table for sulfur dioxide, nitrogen dioxide, ozone, lead and... separate action. II. Analysis of the State's Submittal a. Sulfur Dioxide On June 22, 2010, EPA revised the...

  9. Urban family physician plan in Iran: challenges of implementation in Kerman

    PubMed Central

    Dehnavieh, Reza; Kalantari, Ali Reza; Jafari Sirizi, Mohammad

    2015-01-01

    Background: The Family Physician Plan has recently been implemented in three provinces of Iran on a pilot basis and is going to be implemented throughout Iran in the future. Through a qualitative design, this study aims to determine probable implementation challenges of Family Physician Plan in Kerman. Methods: This study was conducted in Kerman in 2013. Data were collected through interviews with 21 experts in the field. Sampling continued until data saturation level was achieved. All interviews were recorded and then analyzed, and main themes and subgroups were extracted from them based on a framework analysis model. Results: most prevalent establishment challenges of Family Physician Plan were classified into policy-making, financial supply, laws and resources. Conclusion: The urban Family Physician Plan can be carried out more effectively by implementing this plan step by step, highlighting the relationships between the related organizations, using new payment mechanisms e.g Per Capita, DRG, make national commitment and proper educational programs for providers, development the health electronic Record, justifying providers and community about advantages of this plan, clarifying regulatory status about providers' Duties and most importantly considering a specific funding source. PMID:26913266

  10. Sensor planning for moving targets

    NASA Astrophysics Data System (ADS)

    Musman, Scott A.; Lehner, Paul; Elsaesser, Chris

    1994-10-01

    Planning a search for moving ground targets is difficult for humans and computationally intractable. This paper describes a technique to solve such problems. The main idea is to combine probability of detection assessments with computational search heuristics to generate sensor plans which approximately maximize either the probability of detection or a user- specified knowledge function (e.g., determining the target's probable destination; locating the enemy tanks). In contrast to super computer-based moving target search planning, our technique has been implemented using workstation technology. The data structures generated by sensor planning can be used to evaluate sensor reports during plan execution. Our system revises its objective function with each sensor report, allowing the user to assess both the current situation as well as the expected value of future information. This capability is particularly useful in situations involving a high rate of sensor reporting, helping the user focus his attention on sensors reports most pertinent to current needs. Our planning approach is implemented in a three layer architecture. The layers are: mobility analysis, followed by sensor coverage analysis, and concluding with sensor plan analysis. It is possible using these layers to describe the physical, spatial, and temporal characteristics of a scenario in the first two layers, and customize the final analysis to specific intelligence objectives. The architecture also allows a user to customize operational parameters in each of the three major components of the system. As examples of these performance options, we briefly describe the mobility analysis and discuss issues affecting sensor plan analysis.

  11. Development of Phased-Array Ultrasonic Testing Acceptability Criteria : (Phase II)

    DOT National Transportation Integrated Search

    2014-10-01

    The preliminary technical approach and scan plans developed during phase I of this research was implemented on testing four butt-weld specimens. The ray path analysis carried out to develop the scan plans and the preliminary data analysis indicated t...

  12. Salem Community College's 1999-2002 Strategic Plan Authoring & Implementation Strategy.

    ERIC Educational Resources Information Center

    Salem Community Coll., Penns Grove, NJ.

    This document outlines the Strategic Planning Initiative (SPI) for New Jersey's Salem Community College. This is the first plan the college has authored in seven years. The report provides a theoretical framework for heterarchical planning, which allows for complexity and interrelations of structural analysis, and lateral decision making. The…

  13. Integrated corridor management I-15 San Diego, California : analysis plan.

    DOT National Transportation Integrated Search

    2010-02-01

    This AMS Analysis Plan for the I-15 Corridor outlines the various tasks associated with the application of the ICM AMS tools and strategies to this corridor in order to support benefit-cost assessment for the successful implementation of ICM. The rep...

  14. Looking to the future: Framing the implementation of interprofessional education and practice with scenario planning.

    PubMed

    Forman, Dawn; Nicol, Pam; Nicol, Paul

    2015-01-01

    Adapting to interprofessional education and practice requires a change of perspective for many health professionals. We aimed to explore the potential of scenario planning to bridge the understanding gap and framing strategic planning for interprofessional education (IPE) and practice (IPP), as well as to implement innovative techniques and technology for large-group scenario planning. A full-day scenario planning workshop incorporating innovative methodology was designed and offered to participants. The 71 participants included academics from nine universities, as well as service providers, government, students and consumer organisations. The outcomes were evaluated by statistical and thematic analysis of a mixed method survey questionnaire. The scenario planning method resulted in a positive response as a means of collaboratively exploring current knowledge and broadening entrenched attitudes. It was perceived to be an effective instrument for framing strategy for the implementation of IPE/IPP, with 81 percent of respondents to a post-workshop survey indicating they would consider using scenario planning in their own organisations. The scenario planning method can be used by tertiary academic institutions as a strategy in developing, implementing and embedding IPE, and for the enculturation of IPP in practice settings.

  15. Behavioral health insurance parity for federal employees.

    PubMed

    Goldman, Howard H; Frank, Richard G; Burnam, M Audrey; Huskamp, Haiden A; Ridgely, M Susan; Normand, Sharon-Lise T; Young, Alexander S; Barry, Colleen L; Azzone, Vanessa; Busch, Alisa B; Azrin, Susan T; Moran, Garrett; Lichtenstein, Carolyn; Blasinsky, Margaret

    2006-03-30

    To improve insurance coverage of mental health and substance-abuse services, the Federal Employees Health Benefits (FEHB) Program offered mental health and substance-abuse benefits on a par with general medical benefits beginning in January 2001. The plans were encouraged to manage care. We compared seven FEHB plans from 1999 through 2002 with a matched set of health plans that did not have benefits on a par with mental health and substance-abuse benefits (parity of mental health and substance-abuse benefits). Using a difference-in-differences analysis, we compared the claims patterns of matched pairs of FEHB and control plans by examining the rate of use, total spending, and out-of-pocket spending among users of mental health and substance-abuse services. The difference-in-differences analysis indicated that the observed increase in the rate of use of mental health and substance-abuse services after the implementation of the parity policy was due almost entirely to a general trend in increased use that was observed in comparison health plans as well as FEHB plans. The implementation of parity was associated with a statistically significant increase in use in one plan (+0.78 percent, P<0.05) a significant decrease in use in one plan (-0.96 percent, P<0.05), and no significant difference in use in the other five plans (range, -0.38 percent to +0.23 percent; P>0.05 for each comparison). For beneficiaries who used mental health and substance-abuse services, spending attributable to the implementation of parity decreased significantly for three plans (range, -201.99 dollars to -68.97 dollars; P<0.05 for each comparison) and did not change significantly for four plans (range, -42.13 dollars to +27.11 dollars; P>0.05 for each comparison). The implementation of parity was associated with significant reductions in out-of-pocket spending in five of seven plans. When coupled with management of care, implementation of parity in insurance benefits for behavioral health care can improve insurance protection without increasing total costs.

  16. Optimized planning methodologies of ASON implementation

    NASA Astrophysics Data System (ADS)

    Zhou, Michael M.; Tamil, Lakshman S.

    2005-02-01

    Advanced network planning concerns effective network-resource allocation for dynamic and open business environment. Planning methodologies of ASON implementation based on qualitative analysis and mathematical modeling are presented in this paper. The methodology includes method of rationalizing technology and architecture, building network and nodal models, and developing dynamic programming for multi-period deployment. The multi-layered nodal architecture proposed here can accommodate various nodal configurations for a multi-plane optical network and the network modeling presented here computes the required network elements for optimizing resource allocation.

  17. Emerging and Disruptive Technologies for Education: An Analysis of Planning, Implementation, and Diffusion in Florida's Eleven State University System Institutions

    ERIC Educational Resources Information Center

    Bradford, Deborah J.

    2010-01-01

    The purpose of the study was to understand and appreciate the methodologies and procedures used in determining the extent to which an information technology (IT) organization within the eleven member State University Systems (SUS) of Florida planned, implemented, and diffused emerging educational technologies. Key findings found how critical it…

  18. 77 FR 33605 - Privacy Act of 1974: Implementation of Exemptions; Department of Homeland Security Office of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-07

    ... operations center for the Department of Homeland Security.'' Through the NOC, OPS provides real-time...-003 Operations Collection, Planning, Coordination, Reporting, Analysis, and Fusion System of Records... System of Records.'' The DHS/OPS-003 Operations Collection, Planning, Coordination, Reporting, Analysis...

  19. English Language Teaching Curriculum in Iran: Planning and Practice

    ERIC Educational Resources Information Center

    Atai, Mahmood Reza; Mazlum, Farhad

    2013-01-01

    The present study investigates English language teaching (ELT) curriculum planning in Iran's Ministry of Education and its implementation by teachers. We studied programme evaluation; needs analysis; the ELT-specific documents; communication channels between planning and practice levels; teacher evaluation and student assessment; interpretation…

  20. Comments on "Women, Development Planning and Government Policies in Pakistan".

    PubMed

    Hafeez, S

    1992-01-01

    Commentary on Shahnaz and Bilquees Raza's paper on women in development in Pakistan is supportive of the content analysis of the Sixth and Seventh 5-Year Plans and policies, but critical of the methods used n the analysis. The parallel to survey research methods was made in that there was a specification of 1) the unit of analysis (reference to each policy measure, each chapter, each page of the plan), 2) the rationale for the plan, 3) specific objectives of the examination, and 4) the criteria for analysis. Missing also was the identification of policy trends from the Fourth and Fifth 5-Year Plans. The question is never answered as to why gender issues were not directed to the agricultural sector. The conclusion that there was a hugh gap between intentions and implementation was an issue not unique to women's issues, and a deeper analysis may have been required in order to understand the nature and magnitude of the gaps for women's policies and their productive roles. Questions should have been directed to the issues of the root causes of gaps in planning and implementation of policies and programs for women in development, and the identification of quantitative and qualitative indicators of gaps. Questions arise as to whether the gaps have changed with changes in the strength of political and social will in various decades. Recognition was given by the authors to the low budget allocations between 1955 and 1970 to education and health which affected both men and women, but there was scant mention of the strong social, not political, will to enhance women's welfare prevalent at this time. Information was lacking on the differences between the Sixth and Seventh sectoral plans for agricultural employment and women and the working groups plans that did include women in agricultural employment; the question is why the working plans were not incorporated into the final plans, and why the working groups did not protest this omission. The lack of political and social will was one of the most significant gaps between policy and implementation that was the article's focus. Has the Ministry of Women in Development really been given administrative authority to promote social change?

  1. Barriers to Implementing Person-Centered Recovery Planning in Public Mental Health Organizations in Texas: Results from Nine Focus Groups.

    PubMed

    Lodge, Amy C; Kaufman, Laura; Stevens Manser, Stacey

    2017-05-01

    Despite being an established practice in the disabilities service systems, person-centered planning is a relatively new practice in the behavioral health system. As a result, little is known about the barriers that mental health organizations face in implementing person-centered recovery planning (PCRP). To fill this gap, results are presented from a qualitative analysis of nine focus groups at three public mental health organizations in Texas that have been implementing PCRP for at least 2 years. Findings suggest that organizations experienced 12 distinct barriers to PCRP implementation which were categorized into the Consolidated Framework for Implementation Research domains of intervention characteristics, the outer setting, the inner setting, characteristics of individuals, and the implementation process. Half of these 12 barriers fell within the inner setting domain, suggesting that implementation efforts should be flexible and adaptable to organizational culture and context. One-quarter of the barriers fell into the domain of characteristics of individuals involved in the intervention, which further suggests implementation efforts should assess the impact that both staff and consumers have on implementation success.

  2. Opportunities and challenges of resident specialists’ attendance plan guidelines (health-care transformation plan) in Isfahan university hospitals in 2015

    PubMed Central

    Moradi, Reza; Karimi, Saeid; Yarmohammadian, Mohammad Hossein; Kiaei, Mohammad Zakaria; Mazaheri, Elaheh

    2018-01-01

    BACKGROUND: Given new reforms in Iran's health-care system and due to the need for gathering evidence regarding the implementation of this plan, this study aimed to investigate opportunities and challenges created by resident specialist attendance plan guidelines in university hospitals. MATERIALS AND METHODS: This study used the qualitative method. Semi-structured interviews were used for data gathering. The study population included all experts of Isfahan University of Medical Science. Sampling was carried out using purposeful sampling method and continued until data saturation was reached. In total, 16 experts were interviewed. Criteria such as “reliability of information,” “trustworthiness,” and “verifiability of the information” were considered. Interviewees were assured that their names would keep hidden and that all information is confidential. Subject analysis method was used for data analysis. RESULTS: The findings of this study based on subject analysis led to extracting three themes in regards of challenges in the implementation of resident (specialist or fellowship) plan in hospitals including structural, management, and resource challenges and one theme in the area of opportunities which were improved quality and timely provision of services. CONCLUSION: The findings showed that despite the strengths of this guideline, there are some fundamental challenges in various areas and need better attention by national level policymakers. These results help health-care policymakers to evaluate the problem with a better attitude and improve the necessary plans for implementation of these guidelines. PMID:29619390

  3. Implementation of Theeuropeanwater Framework Directive In France: New Challenges For River Basin Organisat Ion, Planning and Participation

    NASA Astrophysics Data System (ADS)

    Allain, S.

    The European Water Framework Directive (2000/60/EC) establishes a system of participatory river basin planning for national and international basins. The French institutional framework for water management is already very close to this system: the 1964 Water Law actually set up basin bodies, the Agences de l'Eau ("Water Agencies"), at the level of large river basins, and multipartite basin commissions, the Comités de Bassin ("River Basin Authorities"), in order to monitor the Agences de l'Eau's policies; besides, the 1992 Water Law created a planning procedure at this level, the Schéma Directeur d'Aménagement et de Gestion des Eaux (SDAGE : "General Water Management Plan"), aiming to determine general orientations for the management of water resources and having to be defined by the Comités de Bassin. At first glance therefore, the implementation of the European Water Framework Directive should not raise a lot of problems in France. However, a quick analysis of the current situation shows that it is not so obvious : if the French Water Policy set up two basin organisations, neither of them deals concretely with the management of the water resources, and the implementation of water management plans depends on many stakeholders; the SDAGE itself only partially meets the demands of the Directive, regarding e. g. the economic analysis; finally, in spite of the creation of multipartite basin commissions, the public participation is very restricted. Such an analysis leads to pay more attention to the relations to establish between organisation, planning and participation at the level of large river basins. An analysis of other elements of the French institutional framework can help us in this way : another planning procedure was actually created by the 1992 Water Law, the Schéma d'Aménagement et de Gestion des Eaux (SAGE : "Water Management Plan"), aiming to fix general objectives to manage the water resources at the level of small river basins, and having to be defined and implemented by a new tripartite entity, the Commission Locale de l'Eau (CLE : Local Water Commission), which can be considered as a real river basin organisation; an empirical analysis of the implementation of such a procedure can offer therefore many new insights and the paper will present the results of an analysis of 10 case studies. But it will be also necessary to put such an experience side by side with the political will to develop public debates and to extend the roles of the Commission Nationale du Débat Public ("Public Debate National Commission").

  4. 77 FR 51739 - Approval and Promulgation of Implementation Plans; Tennessee; Regional Haze State Implementation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-27

    ... original Eastman BART determination and technical analysis provided in the State's April 4, 2008, SIP... EPA cannot read your comment due to technical difficulties and cannot contact you for clarification... the requirements for a BART alternative determination? III. What is EPA's analysis of Tennessee's May...

  5. Application of mobile digital communications in law enforcement, an introductory planning guide

    NASA Technical Reports Server (NTRS)

    Sohn, R. L.; Abraham, J. E.; Leflang, W. G.; Kennedy, R. D.; Wilson, J. H.; Gurfield, R. M.

    1975-01-01

    A set of planning guidelines for the application of digital communications techniques to law enforcement use is presented. Some essential characteristics of digital techniques and their applications are outlined, as are some principles of system analysis, evaluation, and planning. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with respect to this application problem. Information on law enforcement digital communications systems and equipment and a list of vendor sources are given in appendices.

  6. Strategic planning features of subsurface management in Kemerovo Oblast

    NASA Astrophysics Data System (ADS)

    Romanyuk, V.; Grinkevich, A.; Akhmadeev, K.; Pozdeeva, G.

    2016-09-01

    The article discusses the strategic planning features of regional development based on the production and subsurface management in Kemerovo Oblast. The modern approach - SWOT analysis was applied to assess the regional development strategy. The estimation of regional development plan implementation was given for the foreseeable future.

  7. Effects-based strategy development through center of gravity and target system analysis

    NASA Astrophysics Data System (ADS)

    White, Christopher M.; Prendergast, Michael; Pioch, Nicholas; Jones, Eric K.; Graham, Stephen

    2003-09-01

    This paper describes an approach to effects-based planning in which a strategic-theater-level mission is refined into operational-level and ultimately tactical-level tasks and desired effects, informed by models of the expected enemy response at each level of abstraction. We describe a strategy development system that implements this approach and supports human-in-the-loop development of an effects-based plan. This system consists of plan authoring tools tightly integrated with a suite of center of gravity (COG) and target system analysis tools. A human planner employs the plan authoring tools to develop a hierarchy of tasks and desired effects. Upon invocation, the target system analysis tools use reduced-order models of enemy centers of gravity to select appropriate target set options for the achievement of desired effects, together with associated indicators for each option. The COG analysis tools also provide explicit models of the causal mechanisms linking tasks and desired effects to one another, and suggest appropriate observable indicators to guide ISR planning, execution monitoring, and campaign assessment. We are currently implementing the system described here as part of the AFRL-sponsored Effects Based Operations program.

  8. Influences on Adaptive Planning to Reduce Flood Risks among Parishes in South Louisiana.

    PubMed

    Paille, Mary; Reams, Margaret; Argote, Jennifer; Lam, Nina S-N; Kirby, Ryan

    2016-02-01

    Residents of south Louisiana face a range of increasing, climate-related flood exposure risks that could be reduced through local floodplain management and hazard mitigation planning. A major incentive for community planning to reduce exposure to flood risks is offered by the Community Rating System (CRS) of the National Flood Insurance Program (NFIP). The NFIP encourages local collective action by offering reduced flood insurance premiums for individual policy holders of communities where suggested risk-reducing measures have been implemented. This preliminary analysis examines the extent to which parishes (counties) in southern Louisiana have implemented the suggested policy actions and identifies key factors that account for variation in the implementation of the measures. More measures implemented results in higher CRS scores. Potential influences on scores include socioeconomic attributes of residents, government capacity, average elevation and past flood events. The results of multiple regression analysis indicate that higher CRS scores are associated most closely with higher median housing values. Furthermore, higher scores are found in parishes with more local municipalities that participate in the CRS program. The number of floods in the last five years and the revenue base of the parish does not appear to influence CRS scores. The results shed light on the conditions under which local adaptive planning to mitigate increasing flood risks is more likely to be implemented and offer insights for program administrators, researchers and community stakeholders.

  9. Influences on Adaptive Planning to Reduce Flood Risks among Parishes in South Louisiana

    PubMed Central

    Paille, Mary; Reams, Margaret; Argote, Jennifer; Lam, Nina S.-N.; Kirby, Ryan

    2016-01-01

    Residents of south Louisiana face a range of increasing, climate-related flood exposure risks that could be reduced through local floodplain management and hazard mitigation planning. A major incentive for community planning to reduce exposure to flood risks is offered by the Community Rating System (CRS) of the National Flood Insurance Program (NFIP). The NFIP encourages local collective action by offering reduced flood insurance premiums for individual policy holders of communities where suggested risk-reducing measures have been implemented. This preliminary analysis examines the extent to which parishes (counties) in southern Louisiana have implemented the suggested policy actions and identifies key factors that account for variation in the implementation of the measures. More measures implemented results in higher CRS scores. Potential influences on scores include socioeconomic attributes of residents, government capacity, average elevation and past flood events. The results of multiple regression analysis indicate that higher CRS scores are associated most closely with higher median housing values. Furthermore, higher scores are found in parishes with more local municipalities that participate in the CRS program. The number of floods in the last five years and the revenue base of the parish does not appear to influence CRS scores. The results shed light on the conditions under which local adaptive planning to mitigate increasing flood risks is more likely to be implemented and offer insights for program administrators, researchers and community stakeholders. PMID:27330828

  10. Candidate functions for advanced technology implementation in the Columbus mission planning environment

    NASA Technical Reports Server (NTRS)

    Loomis, Audrey; Kellner, Albrecht

    1988-01-01

    The Columbus Project is the European Space Agency's contribution to the International Space Station program. Columbus is planned to consist of three elements (a laboratory module attached to the Space Station base, a man-tended freeflyer orbiting with the Space Station base, and a platform in polar orbit). System definition and requirements analysis for Columbus are underway, scheduled for completion in mid-1990. An overview of the Columbus mission planning environment and operations concept as currently defined is given, and some of the challenges presented to software maintainers and ground segment personnel during mission operators are identified. The use of advanced technologies in system implementation is being explored. Both advantages of such solutions and potential problems they present are discussed, and the next steps to be taken by Columbus before targeting any functions for advanced technology implementation are summarized. Several functions in the mission planning process were identified as candidates for advanced technology implementation. These range from expert interaction with Columbus' data bases through activity scheduling and near-real-time response to departures from the planned timeline. Each function is described, and its potential for advanced technology implementation briefly assessed.

  11. Commercial non-aerospace technology transfer program for the 2000s: Strategic analysis and implementation

    NASA Technical Reports Server (NTRS)

    Horsham, Gary A. P.

    1992-01-01

    This report presents a strategic analysis and implementation plan for NASA's Office of Commercial Programs (OCP), Technology Transfer Division's (TTD), Technology Transfer Program. The main objectives of this study are to: (1) characterize the NASA TTD's environment and past organizational structure; (2) clearly identify current and prospective programmatic efforts; (3) determine an evolutionary view of an organizational structure which could lead to the accomplishment of NASA's future technology transfer aims; and (4) formulate a strategy and plan to improve NASA's (and other federal agencies) ability to transfer technology to the non-aerospace sectors of the U.S. economy. The planning horizon for this study extends through the remainder of the 1990s to the year 2000.

  12. Market Analysis. What Is It? How Does It Fit into Comprehensive Institutional Planning?

    ERIC Educational Resources Information Center

    Groff, Warren

    The basic principles of market analysis are examined in this paper especially as they relate to institutional planning. Introductory material presents background information, including: (1) a description of two projects undertaken to implement modern management techniques at small colleges; (2) an examination of three marketing philosophies; and…

  13. Space Operations Center: A concept analysis

    NASA Technical Reports Server (NTRS)

    Livingston, L. E.

    1979-01-01

    The Space Operations Center is a concept for a shuttle-service, permanent, manned facility in low Earth orbit. An analysis of this concept was conducted and the results are reported. It is noted that there are no NASA plans at present to implement such a concept. The results are intended for consideration in future planning.

  14. 77 FR 77117 - Proposed Revision 0 on Access Authorization-Operational Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ...--Operational Program AGENCY: Nuclear Regulatory Commission. ACTION: Standard review plan-draft section revision... public comment on NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for... seeks comments on the new Section 13.6.4 of the Standard Review Plan (SRP) concerning implementation of...

  15. Public Participation Planning of Environmental Impact Assessment (EIA) and Regulations: Analysis of Inconsistency for Some Cases in Indonesia

    NASA Astrophysics Data System (ADS)

    Hindrayani, Aniek; Purwanto

    2018-02-01

    The failure in community involvement during the environmental documents planning may result in the failure of the planned project implementation. This study aims to determine the gap between practices and regulations that apply to the process of community involvement in the environmental documents planning, and find out inconsistency of implementation on each stakeholder in the planning of the Environmental Impact Assessment (EIA) and the environmental permit. The method used was qualitative through interview and literature study which is analyzed using triangulation model and presented in the form of concept map. The results of the study indicate that 1) the determination of community representatives based on the criteria of the impacted communities is not clearly described, 3) suggestions, opinions, and responses to the environmental impact management are not well implemented by the project proponent, 3) implementation of the environmental management of other licensed activities affecting the behavior (4) stakeholders (project proponent, EIA consultants, and EIA appraisal committee) do not play their role as mandated in applicable legislation.

  16. A required course in the development, implementation, and evaluation of clinical pharmacy services.

    PubMed

    Skomo, Monica L; Kamal, Khalid M; Berdine, Hildegarde J

    2008-10-15

    To develop, implement, and assess a required pharmacy practice course to prepare pharmacy students to develop, implement, and evaluate clinical pharmacy services using a business plan model. Course content centered around the process of business planning and pharmacoeconomic evaluations. Selected business planning topics included literature evaluation, mission statement development, market evaluation, policy and procedure development, and marketing strategy. Selected pharmacoeconomic topics included cost-minimization analysis, cost-benefit analysis, cost-effectiveness analysis, cost-utility analysis, and health-related quality of life (HRQoL). Assessment methods included objective examinations, student participation, performance on a group project, and peer evaluation. One hundred fifty-three students were enrolled in the course. The mean scores on the objective examinations (100 points per examination) ranged from 82 to 85 points, with 25%-35% of students in the class scoring over 90, and 40%-50% of students scoring from 80 to 89. The mean scores on the group project (200 points) and classroom participation (50 points) were 183.5 and 46.1, respectively. The mean score on the peer evaluation was 30.8, with scores ranging from 27.5 to 31.7. The course provided pharmacy students with the framework necessary to develop and implement evidence-based disease management programs and to assure efficient, cost-effective utilization of pertinent resources in the provision of patient care.

  17. A Required Course in the Development, Implementation, and Evaluation of Clinical Pharmacy Services

    PubMed Central

    Kamal, Khalid M.; Berdine, Hildegarde J.

    2008-01-01

    Objective To develop, implement, and assess a required pharmacy practice course to prepare pharmacy students to develop, implement, and evaluate clinical pharmacy services using a business plan model. Design Course content centered around the process of business planning and pharmacoeconomic evaluations. Selected business planning topics included literature evaluation, mission statement development, market evaluation, policy and procedure development, and marketing strategy. Selected pharmacoeconomic topics included cost-minimization analysis, cost-benefit analysis, cost-effectiveness analysis, cost-utility analysis, and health-related quality of life (HRQoL). Assessment methods included objective examinations, student participation, performance on a group project, and peer evaluation. Assessment One hundred fifty-three students were enrolled in the course. The mean scores on the objective examinations (100 points per examination) ranged from 82 to 85 points, with 25%-35% of students in the class scoring over 90, and 40%-50% of students scoring from 80 to 89. The mean scores on the group project (200 points) and classroom participation (50 points) were 183.5 and 46.1, respectively. The mean score on the peer evaluation was 30.8, with scores ranging from 27.5 to 31.7. Conclusion The course provided pharmacy students with the framework necessary to develop and implement evidence-based disease management programs and to assure efficient, cost-effective utilization of pertinent resources in the provision of patient care. PMID:19214263

  18. Economic (gross cost) analysis of systematically implementing a programme of advance care planning in three Irish nursing homes.

    PubMed

    O'Sullivan, Ronan; Murphy, Aileen; O'Caoimh, Rónán; Cornally, Nicola; Svendrovski, Anton; Daly, Brian; Fizgerald, Carol; Twomey, Cillian; McGlade, Ciara; Molloy, D William

    2016-04-26

    Although advance care planning (ACP) and the use of advanced care directives (ACD) and end-of-life care plans are associated with a reduction in inappropriate hospitalisation, there is little evidence supporting the economic benefits of such programmes. We assessed the economic impact (gross savings) of the Let Me Decide (LMD) ACP programme in Ireland, specifically the impact on hospitalisations, bed days and location of resident deaths, before and after systematic implementation of the LMD-ACP combined with a palliative care education programme. The LMD-ACP was introduced into three long-term care (LTC) facilities in Southern Ireland and outcomes were compared pre and post implementation. In addition, 90 staff were trained in a palliative care educational programme. Economic analysis including probabilistic sensitivity analysis was performed. The uptake of an ACD or end-of-life care post-implementation rose from 25 to 76%. Post implementation, there were statistically significant decreases in hospitalisation rates from baseline (hospitalisation incidents declined from 27.8 to 14.6%, z = 3.96, p < 0.001; inpatient hospital days reduced from 0.54 to 0.36%, z = 8.85, p < 0.001). The percentage of hospital deaths also decreased from 22.9 to 8.4%, z = 3.22, p = 0.001. However, length of stay (LOS) increased marginally (7-9 days). Economic analysis suggested a cost-reduction related to reduced hospitalisations ranging between €10 and €17.8 million/annum and reduction in ambulance transfers, estimated at €0.4 million/annum if these results were extrapolated nationally. When unit costs and LOS estimates were varied in scenario analyses, the expected cost reduction owing to reduced hospitalisations, ranged from €17.7 to €42.4 million nationally. Implementation of the LMD-ACP (ACD/end-of-life care plans combined with palliative care education) programme resulted in reduced rates of hospitalisation. Despite an increase in LOS, likely reflecting more complex care needs of admitted residents, gross costs were reduced and scenario analysis projected large annual savings if these results were extrapolated to the wider LTC population in Ireland.

  19. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 4: Solar electric propulsion vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents the solar electric propulsion (SEP) concept design developed as part of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the SEP concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

  20. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 2: Cryo/aerobrake vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The cryogenic/aerobrake (CAB) and the cryogenic all-propulsive (CAP) concept designs developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study are presented. The evolution of the CAB and CAP concepts is described along with the requirements, guidelines and assumptions for the designs. Operating modes and options are defined and systems descriptions of the vehicles are presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

  1. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 5: Nuclear electric propulsion vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The nuclear electric propulsion (NEP) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study is presented. The evolution of the NEP concept is described along with the requirements, guidelines, and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

  2. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 3: Nuclear thermal rocket vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents the nuclear thermal rocket (NTR) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the NTR concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

  3. Implementation status and explanatory analysis of early advance care planning for Stage IV non-small cell lung cancer patients.

    PubMed

    Tokito, Takaaki; Murakami, Haruyasu; Mori, Keita; Osaka, Iwao; Takahashi, Toshiaki

    2015-03-01

    The American Society of Clinical Oncology published the goals of individualized care including advance care planning for advanced cancer patients in 2011. However, no data are available on the implementation status of advance care planning. We retrospectively reviewed the electronic medical records and informed consent forms of consecutive Stage IV non-small cell lung cancer patients treated with chemotherapy between January 2010 and December 2012 at our institution. Two outcomes were defined to investigate the advance care planning implementation status: C-D, the duration from the last day of chemotherapy to death and D-D, that from the day of confirmed do-not-attempt-resuscitation order to death. The study included 136 eligible patients. The advance care planning implementation status in participating patients was as follows: 96 (70%) patients received information on 'incurable disease before first-line chemotherapy', 69 (50%) were informed about 'supportive care before first-line chemotherapy', whereas 43 (32%) learned about their prognosis. The do-not-attempt-resuscitation decision was reflected in 29 patients' will (21%). The median C-D was 64 days. Receipt of ≤2 chemotherapy regimens and provision of prognosis information to patients were significantly associated with long C-D in multivariate analysis. The median D-D was 25 days. Provision of information on supportive care before first-line chemotherapy and provision of prognosis information to patients were significantly associated with long D-D in multivariate analysis. Our results suggest that there is possible benefit from providing information on supportive care before first-line chemotherapy and informing patients about their prognosis in prolonging the duration of supportive care. © The Author 2014. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  4. Incorporating gender, equity, and human rights into the action planning process: moving from rhetoric to action

    PubMed Central

    Sridharan, Sanjeev; Maplazi, Joanna; Shirodkar, Apurva; Richardson, Emma; Nakaima, April

    2016-01-01

    Background Mainstreaming of gender, equity, and human rights (GER) is an important focus of the World Health Organization (WHO) and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations. PMID:27606968

  5. Strategic Plan for the Spanish Academy of Dermatology and Venerology (AEDV): FuturAEDV 2013-2017.

    PubMed

    Ribera Pibernat, M; Moreno Jiménez, J C; Valcuende Cavero, F; Soto de Delás, J; Vázquez Veiga, H; Lázaro Ochaíta, P; Giménez Arnau, A

    2014-09-01

    The Spanish Academy of Dermatology and Venereology (AEDV) has decided that a Strategic Plan is needed to help the association adapt to new circumstances and anticipate future developments. 1) To position the AEDV as a medical association that can exert an influence in everything related to dermatology. 2) To contribute to the development of the specialty, strengthening the prestige and reputation of dermatology and dermatologists. 3) To establish a model for operating and strategic thinking that can be handed on to successive Boards of Directors and will enable the Academy to identify future challenges. The approach used to develop the Strategic Plan was as follows: analysis of trends in the health care system; assessment of the current situation of AEDV and of dermatology in general through an internal analysis based on surveys and interviews with academics; analysis of strengths, weaknesses, opportunities, and threats; preparation of a mission statement; and identification, development, and implementation of a strategy map prioritizing strategic lines of action. The strategy map set out 16 general goals grouped into 4 main topics (achieving the vision, internal and external customers, internal processes, and innovation) and detailed in an action plan with 19 initiatives, each with specific actions. The plan will be monitored by the Strategic Plan Monitoring Committee, which is made up of the members of the Standing Committee and the chairs of the 9 Technical Committees responsible for implementing the initiatives. The Functional Plan should guide the management of AEDV until 2017, and its implementation will enable the association to contribute to the development and prestige of the specialty and position itself as a reference in terms of its functional model. Copyright © 2014 Elsevier España, S.L.U. y AEDV. All rights reserved.

  6. Systems Analysis of Rapid Transit Underground Construction : Volume 1. Sections 1-5.

    DOT National Transportation Integrated Search

    1974-12-01

    This study describes rapid transit system implementation, design, and construction procedures. The relationships and responsibilities of governmental, private, and public groups involved in planning and implementing an urban rapid transit system are ...

  7. KSC management training system project

    NASA Technical Reports Server (NTRS)

    Sepulveda, Jose A.

    1993-01-01

    The stated objectives for the summer of 1993 were: to review the Individual Development Plan Surveys for 1994 in order to automate the analysis of the Needs Assessment effort; and to develop and implement evaluation methodologies to perform ongoing program-wide course-to-course assessment. This includes the following: to propose a methodology to develop and implement objective, performance-based assessment instruments for each training effort; to mechanize course evaluation forms and develop software to facilitate the data gathering, analysis, and reporting processes; and to implement the methodology, forms, and software in at lease one training course or seminar selected among those normally offered in the summer at KSC. Section two of this report addresses the work done in regard to the Individual Development Plan Surveys for 1994. Section three presents the methodology proposed to develop and implement objective, performance-based assessment instruments for each training course offered at KSC.

  8. Actor coalitions and implementation in strategic delta planning: Opening the Haringvliet sluices in the Netherlands

    NASA Astrophysics Data System (ADS)

    Vermoolen, Myrthe; Hermans, Leon

    2016-04-01

    The sustained development of urbanizing deltas is influenced by natural and societal processes. These processes are characterized by their long time span, in which conflicting interests of different stakeholders have to be reconciled. Reaching consent between actors is a challenge itself, but maintaining this consent throughout different stages of strategic planning - from advocacy and agenda setting to implementation - over these long periods of time is even more difficult. The implementation stage still includes many different actors involved, some of which are different than the ones who agreed before, due to both the long run of the strategic delta planning, and to a shift of tasks and responsibilities. Thus, implementation of strategic plans often features delays, deviations of agreed plans and unintended outcomes. A key question therefore is how coalition dynamics in (pre-)planning stages influence and are influenced by the coalition dynamics during implementation. The different stages in strategic planning are often studied from either a plan formulation or an implementation perspective, but the connection between the two proves an important bottleneck for strategic planning in deltas. For instance, many building with nature solutions are still in their pilot-phase, and their upscaling can profit from lessons concerning past implementation efforts. The proposed contribution will use the case of the management of the Dutch Haringvliet sluices and the decision ('Kierbesluit') in 2000 to put these sluices ajar, to study the link between the different strategic delta planning stages and the role of the formation and change of actor coalitions herein. With the completion of the Haringvliet dam with outlet sluices in 1970, the Haringvliet estuary of the rivers Rhine and Meuse was closed off from the sea, creating a fresh water lake. This was done to make the Dutch Southwest delta safe from flooding, and had positive effects for agricultural water supply and drinking water, but negative consequences for the ecological quality and biodiversity. In the 1980s environmental awareness increased. To restore natural processes, it was decided in 2000 to put the sluices 'ajar' as a first step towards the strategic long-term vision of tidal restoration and major rehabilitation of the Rhine-Meuse estuary. First planning was to have the Kierbesluit implemented in 2005. However, this has been put off again and again, and since the actual implementation started in 2013, planning is to have the infrastructures ready to start opening the sluices in 2018 - 13 years later. What was supposed to be the first step towards full estuarine recovery has become an end goal itself, with implementing actors strictly focusing on putting the sluices ajar and compensating for fresh water loss, dismissing building with nature possibilities behind the dam. The Advocacy Coalition Framework is used as a starting point for analysis, and will be altered and detailed with insights from implementation literature to identify lessons regarding the role and dynamics of actor coalitions from the planning to implementation stage of strategic delta planning.

  9. MO-F-16A-01: Implementation of MPPG TPS Verification Tests On Various Accelerators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smilowitz, J; Bredfeldt, J; Geurts, M

    2014-06-15

    Purpose: To demonstrate the implementation of the Medical Physics Practice Guideline (MPPG) for dose calculation and beam parameters verification of treatment planning systems (TPS). Methods: We implemented the draft TPS MPPG for three linacs: Varian Trilogy, TomoHDA and Elekta Infinity. Static and modulated test plans were created. The static fields are different than used in commissioning. Data was collected using ion chambers and diodes in a scanning water tank, Delta4 phantom and a custom phantom. MatLab and Microsoft Excel were used to create analysis tools to compare reference DICOM dose with scan data. This custom code allowed for the interpolation,more » registration and gamma analysis of arbitrary dose profiles. It will be provided as open source code. IMRT fields were validated with Delta4 registration and comparison tools. The time for each task was recorded. Results: The tests confirmed the strengths, and revealed some limitations, of our TPS. The agreement between calculated and measured dose was reported for all beams. For static fields, percent depth dose and profiles were analyzed with criteria in the draft MPPG. The results reveal areas of slight mismatch with the model (MLC leaf penumbra, buildup region.) For TomoTherapy, the IMRT plan 2%/2 mm gamma analysis revealed poorest agreement in the low dose regions. For one static test plan for all 10MV Trilogy photon beams, the plan generation, scan queue creation, data collection, data analysis and report took 2 hours, excluding tank setup. Conclusions: We have demonstrated the implementation feasibility of the TPS MPPG. This exercise generated an open source tool for dose comparisons between scan data and DICOM dose data. An easily reproducible and efficient infrastructure with streamlined data collection was created for repeatable robust testing of the TPS. The tests revealed minor discrepancies in our models and areas for improvement that are being investigated.« less

  10. GPU-accelerated automatic identification of robust beam setups for proton and carbon-ion radiotherapy

    NASA Astrophysics Data System (ADS)

    Ammazzalorso, F.; Bednarz, T.; Jelen, U.

    2014-03-01

    We demonstrate acceleration on graphic processing units (GPU) of automatic identification of robust particle therapy beam setups, minimizing negative dosimetric effects of Bragg peak displacement caused by treatment-time patient positioning errors. Our particle therapy research toolkit, RobuR, was extended with OpenCL support and used to implement calculation on GPU of the Port Homogeneity Index, a metric scoring irradiation port robustness through analysis of tissue density patterns prior to dose optimization and computation. Results were benchmarked against an independent native CPU implementation. Numerical results were in agreement between the GPU implementation and native CPU implementation. For 10 skull base cases, the GPU-accelerated implementation was employed to select beam setups for proton and carbon ion treatment plans, which proved to be dosimetrically robust, when recomputed in presence of various simulated positioning errors. From the point of view of performance, average running time on the GPU decreased by at least one order of magnitude compared to the CPU, rendering the GPU-accelerated analysis a feasible step in a clinical treatment planning interactive session. In conclusion, selection of robust particle therapy beam setups can be effectively accelerated on a GPU and become an unintrusive part of the particle therapy treatment planning workflow. Additionally, the speed gain opens new usage scenarios, like interactive analysis manipulation (e.g. constraining of some setup) and re-execution. Finally, through OpenCL portable parallelism, the new implementation is suitable also for CPU-only use, taking advantage of multiple cores, and can potentially exploit types of accelerators other than GPUs.

  11. Improving Treatment Plan Implementation in Schools: A Meta-Analysis of Single Subject Design Studies

    ERIC Educational Resources Information Center

    Noell, George H.; Gansle, Kristin A.; Mevers, Joanna Lomas; Knox, R. Maria; Mintz, Joslyn Cynkus; Dahir, Amanda

    2014-01-01

    Twenty-nine peer-reviewed journal articles that analyzed intervention implementation in schools using single-case experimental designs were meta-analyzed. These studies reported 171 separate data paths and provided 3,991 data points. The meta-analysis was accomplished by fitting data extracted from graphs in mixed linear growth models. This…

  12. Implementation of Flu (Influenza) Vaccination into Armenian Armed Forces Pre-Emptive Vaccination Plan

    DTIC Science & Technology

    2016-12-01

    Vinci, M., Zordan, M., & Serra, G. (2006). Cost - benefit analysis of influenza vaccination in a public healthcare unit. Therapeutics and Clinical...readiness, flu morbidity, flu vaccination, pre-emptive vaccination plan, cost - benefit analysis 15. NUMBER OF PAGES 83 16. PRICE CODE 17...expenditures pose a heavy burden on the government. A cost - benefit analysis of the flu vaccination would assess whether conducting flu vaccination is

  13. Strategic business planning linking strategy with financial reality.

    PubMed

    Bachrodt, Andrew K; Smyth, J Patrick

    2004-11-01

    To succeed in today's complex and often adverse business environment, a healthcare organization's strategic direction must be calculated, focused, and financially sustainable. Strategic business planning is an essential tool to help organizations focus strategic choices within the financial realities of their environment. An effective strategic business planning cycle includes conducting an assessment, identifying business objectives, developing strategy, conducting an impact analysis, and developing an implementation plan.

  14. Positioning pharmacists' roles in primary health care: a discourse analysis of the compensation plan in Alberta, Canada.

    PubMed

    Hughes, Christine A; Breault, Rene R; Hicks, Deborah; Schindel, Theresa J

    2017-11-23

    A comprehensive Compensation Plan for pharmacy services delivered by community pharmacists was implemented in Alberta, Canada in July 2012. Services covered by the Compensation Plan include care planning services, prescribing services such as adapting prescriptions, and administering a drug or publicly-funded vaccine by injection. Understanding how the Compensation Plan was framed and communicated provides insight into the roles of pharmacists and the potential influence of language on the implementation of services covered by the Compensation Plan by Albertan pharmacists. The objective of this study is to examine the positioning of pharmacists' roles in documents used to communicate the Compensation Plan to Albertan pharmacists and other audiences. Publicly available documents related to the Compensation Plan, such as news releases or reports, published between January 2012 and December 2015 were obtained from websites such as the Government of Alberta, Alberta Blue Cross, the Alberta College of Pharmacists, the Alberta Pharmacists' Association, and the Blueprint for Pharmacy. Searches of the Canadian Newsstand database and Google identified additional documents. Discourse analysis was performed using social positioning theory to explore how pharmacists' roles were constructed in communications about the Compensation Plan. In total, 65 publicly available documents were included in the analysis. The Compensation Plan was put forward as a framework for payment for professional services and formal legitimization of pharmacists' changing professional roles. The discourse associated with the Compensation Plan positioned pharmacists' roles as: (1) expanding to include services such as medication management for chronic diseases, (2) contributing to primary health care by providing access to services such as prescription renewals and immunizations, and (3) collaborating with other health care team members. Pharmacists' changing roles were positioned in alignment with the aims of primary health care. Social positioning theory provides a useful lens to examine the dynamic and evolving roles of pharmacists. This study provides insight into how communications regarding the Compensation Plan in Alberta, Canada positioned pharmacists' changing roles in the broader context of changes to primary health care delivery. Our findings may be useful for other jurisdictions considering implementation of remunerated clinical services provided by pharmacists.

  15. Theoretical orientations in environmental planning: An inquiry into alternative approaches

    NASA Astrophysics Data System (ADS)

    Briassoulis, Helen

    1989-07-01

    In the process of devising courses of action to resolve problems arising at the society-environment interface, a variety of planning approaches are followed, whose adoption is influenced by—among other things—the characteristics of environmental problems, the nature of the decision-making context, and the intellectual traditions of the disciplines contributing to the study of these problems. This article provides a systematic analysis of six alternative environmental planning approaches—comprehensive/rational, incremental, adaptive, contingency, advocacy, and participatory/consensual. The relative influence of the abovementioned factors is examined, the occurrence of these approaches in real-world situations is noted, and their environmental soundness and political realism is evaluated. Because of the disparity between plan formulation and implementation and between theoretical form and empirical reality, a synthetic view of environmental planning approaches is taken and approaches in action are identified, which characterize the totality of the planning process from problem definition to plan implementation, as well as approaches in the becoming, which may be on the horizon of environmental planning of tomorrow. The suggested future research directions include case studies to verify and detail the presence of the approaches discussed, developing measures of success of a given approach in a given decision setting, and an intertemporal analysis of environmental planning approaches.

  16. 78 FR 28776 - Approval and Promulgation of Implementation Plans; Georgia; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Section of this Federal Register, EPA is approving the State's implementation plan revision as a direct... Promulgation of Implementation Plans; Georgia; State Implementation Plan Miscellaneous Revisions AGENCY... State Implementation Plan (SIP) submitted by the Georgia Environmental Protection Division to EPA in...

  17. Implementation plans included in World Health Organisation guidelines.

    PubMed

    Wang, Zhicheng; Norris, Susan L; Bero, Lisa

    2016-05-20

    The implementation of high-quality guidelines is essential to improve clinical practice and public health. The World Health Organisation (WHO) develops evidence-based public health and other guidelines that are used or adapted by countries around the world. Detailed implementation plans are often necessary for local policymakers to properly use the guidelines developed by WHO. This paper describes the plans for guideline implementation reported in WHO guidelines and indicates which of these plans are evidence-based. We conducted a content analysis of the implementation sections of WHO guidelines approved by the WHO guideline review committee between December 2007 and May 2015. The implementation techniques reported in each guideline were coded according to the Cochrane Collaboration's Effective Practice and Organisation of Care (EPOC) taxonomy and classified as passive, active or policy strategies. The frequencies of implementation techniques are reported. The WHO guidelines (n = 123) analysed mentioned implementation techniques 800 times, although most mentioned implementation techniques very briefly, if at all. Passive strategies (21 %, 167/800) and general policy strategies (62 %, 496/800) occurred most often. Evidence-based active implementation methods were generally neglected with no guideline mentioning reminders (computerised or paper) and only one mentioning a multifaceted approach. Many guidelines contained implementation sections that were identical to those used in older guidelines produced by the same WHO technical unit. The prevalence of passive and policy-based implementation techniques as opposed to evidence-based active techniques suggests that WHO guidelines should contain stronger guidance for implementation. This could include structured and increased detail on implementation considerations, accompanying or linked documents that provide information on what is needed to contextualise or adapt a guideline and specific options from among evidence-based implementation strategies.

  18. A comparison of the convolution and TMR10 treatment planning algorithms for Gamma Knife® radiosurgery

    PubMed Central

    Wright, Gavin; Harrold, Natalie; Bownes, Peter

    2018-01-01

    Aims To compare the accuracies of the convolution and TMR10 Gamma Knife treatment planning algorithms, and assess the impact upon clinical practice of implementing convolution-based treatment planning. Methods Doses calculated by both algorithms were compared against ionisation chamber measurements in homogeneous and heterogeneous phantoms. Relative dose distributions calculated by both algorithms were compared against film-derived 2D isodose plots in a heterogeneous phantom, with distance-to-agreement (DTA) measured at the 80%, 50% and 20% isodose levels. A retrospective planning study compared 19 clinically acceptable metastasis convolution plans against TMR10 plans with matched shot times, allowing novel comparison of true dosimetric parameters rather than total beam-on-time. Gamma analysis and dose-difference analysis were performed on each pair of dose distributions. Results Both algorithms matched point dose measurement within ±1.1% in homogeneous conditions. Convolution provided superior point-dose accuracy in the heterogeneous phantom (-1.1% v 4.0%), with no discernible differences in relative dose distribution accuracy. In our study convolution-calculated plans yielded D99% 6.4% (95% CI:5.5%-7.3%,p<0.001) less than shot matched TMR10 plans. For gamma passing criteria 1%/1mm, 16% of targets had passing rates >95%. The range of dose differences in the targets was 0.2-4.6Gy. Conclusions Convolution provides superior accuracy versus TMR10 in heterogeneous conditions. Implementing convolution would result in increased target doses therefore its implementation may require a revaluation of prescription doses. PMID:29657896

  19. Planned Educational Change in Search of a Research Tradition

    ERIC Educational Resources Information Center

    Heathers, Glenn

    1974-01-01

    Attempts at change in education have been largely unsuccessful, producing only superficial change because of inadequate needs analysis, unsound implementation plans, insufficient training in the use of innovations, and failure to involve practitioners in the decision-making process. (HMD)

  20. An Asset-Based Approach to Tribal Community Energy Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gutierrez, Rachael A.; Martino, Anthony; Begay, Sandra K.

    Community energy planning is a vital component of successful energy resource development and project implementation. Planning can help tribes develop a shared vision and strategies to accomplish their energy goals. This paper explores the benefits of an asset-based approach to tribal community energy planning. While a framework for community energy planning and federal funding already exists, some areas of difficulty in the planning cycle have been identified. This paper focuses on developing a planning framework that offsets those challenges. The asset-based framework described here takes inventory of a tribe’s capital assets, such as: land capital, human capital, financial capital, andmore » political capital. Such an analysis evaluates how being rich in a specific type of capital can offer a tribe unique advantages in implementing their energy vision. Finally, a tribal case study demonstrates the practical application of an asset-based framework.« less

  1. Rapid Development: A Content Analysis Comparison of Literature and Purposive Sampling of AFRL Rapid Reaction Projects

    DTIC Science & Technology

    2011-12-01

    systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical

  2. Evaluation of a collaborative model: a case study analysis of watershed planning in the intermountain west

    Treesearch

    Gary Bentrup

    2001-01-01

    Collaborative planning processes have become increasingly popular for addressing environmental planning issues, resulting in a number of conceptual models for collaboration. A model proposed by Selin and Chavez suggests that collaboration emerges from a series of antecedents and then proceeds sequentially through problem-setting, direction-setting, implementation, and...

  3. Use of the recreation opportunity planning system to inventory recreation opportunities of arid lands

    Treesearch

    Perry J. Brown; B. L. Driver; Joseph K. Berry

    1981-01-01

    Recreation opportunity planning, which is being adopted by some land management agencies for recreation input to land management planning, is reviewed for its applicability to arid land situations. Particular attention is given to the inventory and analysis phases of the system and to what we have learned about its implementation during its development.

  4. Child Care and Development Fund: Report of State Plans FY 2002-2003.

    ERIC Educational Resources Information Center

    Administration on Children, Youth, and Families (DHHS), Washington, DC. Child Care Bureau.

    The Personal Responsibility and Work Opportunity Reconciliation Act requires each state to submit a biennial plan to implement the Child Care and Development Fund (CCDF). This report summarizes information in the biennial plans submitted for the period October 1, 2001 to September 30, 2003. The analysis includes information from 50 states, the…

  5. Analysis of Controller-Pilot Voice Communications from Kansas City Air Route Traffic Control Center

    DOT National Transportation Integrated Search

    2017-07-01

    The implementation of Controller Pilot Datalink Communications (CPDLC) in domestic en route airspace is a key enabling technology in the Next Generation Air Transportation System. The Federal Aviation Administration plans to implement en route CPDLC ...

  6. ["Good intentions are not enough": analysis of a health policy for the elderly in Senegal].

    PubMed

    Mbaye, Elhadji Mamadou; Ridde, Valery; Kâ, Ousseynou

    2013-01-01

    In 2006, the Senegalese government introduced the "Plan Sésame", an unprecedented policy in West Africa aimed at reducing social vulnerability among the elderly (i.e. people aged over 60 years). This paper examines the process of implementation of the "Plan Sdsame': Using a qualitative approach, the study was based on a unique case study authorized by the Senegalese Ministry of Health. Three methods were used: i) individual interviews (n = 19), ii) discussion groups (n = 24), and iii) documentary study. Despite its social objective, the "Plan Sésame" was ultimately limited to free health care. However, even the health component of the plan has suffered from under funding. Political obstacles, inadequate accompanying measures and short staffing have resulted in late reimbursements at a local level, thus limiting the implementation of the plan. While both health professionals and elderly people are in favor of free healthcare, they are also critical of the implementation issues surrounding the "Plan Sésame": Although it appears to be a viable solution, these issues may spell the end of the plan. The task of designing solid technical foundations and developing appropriate accompanying measures should not be overlooked because of the limited interest of international partners in the "Plan Sésame" the national dimension of the plan and its electoral importance.

  7. 32 CFR 775.6 - Planning considerations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... it has been determined, through NEPA analysis where the DON was a lead or cooperating agency, that... National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY MISCELLANEOUS RULES PROCEDURES FOR IMPLEMENTING THE NATIONAL ENVIRONMENTAL POLICY ACT § 775.6 Planning considerations. (a) An EIS...

  8. 32 CFR 775.6 - Planning considerations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... it has been determined, through NEPA analysis where the DON was a lead or cooperating agency, that... National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY MISCELLANEOUS RULES PROCEDURES FOR IMPLEMENTING THE NATIONAL ENVIRONMENTAL POLICY ACT § 775.6 Planning considerations. (a) An EIS...

  9. 32 CFR 775.6 - Planning considerations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... it has been determined, through NEPA analysis where the DON was a lead or cooperating agency, that... National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY MISCELLANEOUS RULES PROCEDURES FOR IMPLEMENTING THE NATIONAL ENVIRONMENTAL POLICY ACT § 775.6 Planning considerations. (a) An EIS...

  10. From plans to actions in patient and public involvement: qualitative study of documented plans and the accounts of researchers and patients sampled from a cohort of clinical trials

    PubMed Central

    Buck, Deborah; Gamble, Carrol; Dudley, Louise; Preston, Jennifer; Hanley, Bec; Williamson, Paula R; Young, Bridget

    2014-01-01

    Patient and public involvement (PPI) in research is increasingly required, although evidence to inform its implementation is limited. Objective Inform the evidence base by describing how plans for PPI were implemented within clinical trials and identifying the challenges and lessons learnt by research teams. Methods We compared PPI plans extracted from clinical trial grant applications (funded by the National Institute for Health Research Health Technology Assessment Programme between 2006 and 2010) with researchers’ and PPI contributors’ interview accounts of PPI implementation. Analysis of PPI plans and transcribed qualitative interviews drew on the Framework technique. Results Of 28 trials, 25 documented plans for PPI in funding applications and half described implementing PPI before applying for funding. Plans varied from minimal to extensive, although almost all anticipated multiple modes of PPI. Interview accounts indicated that PPI plans had been fully implemented in 20/25 trials and even expanded in some. Nevertheless, some researchers described PPI within their trials as tokenistic. Researchers and contributors noted that late or minimal PPI engagement diminished its value. Both groups perceived uncertainty about roles in relation to PPI, and noted contributors’ lack of confidence and difficulties attending meetings. PPI contributors experienced problems in interacting with researchers and understanding technical language. Researchers reported difficulties finding ‘the right’ PPI contributors, and advised caution when involving investigators’ current patients. Conclusions Engaging PPI contributors early and ensuring ongoing clarity about their activities, roles and goals, is crucial to PPI's success. Funders, reviewers and regulators should recognise the value of preapplication PPI and allocate further resources to it. They should also consider whether PPI plans in grant applications match a trial's distinct needs. Monitoring and reporting PPI before, during and after trials will help the research community to optimise PPI, although the need for ongoing flexibility in implementing PPI should also be recognised. PMID:25475243

  11. [Analysis of the Burkinabe National Health Program for the Elderly (BNPEH) 2008-2012].

    PubMed

    Berthé-Sanou, Lalla; Berthé, Abdramane; Drabo, Maxime; Badini-Kinda, Fatoumata; Somé, Mathias; Ouedraogo, Dieudonné; Macq, Jean

    2013-01-01

    As a result of ageing of the population, most countries of sub-Saharan Africa, either spontaneously and/or in response to international incentives, are starting to develop sectorial or multisectorial action plans in favour of the elderly. Are these plans relevant and consistent and do they improve the health of the elderly? This study was performed to assess the relevance, consistency and implementation of the National Health Programme for the Elderly (PNSPA) 2008-2012 in Burkina Faso. This qualitative analysis was conducted in Ouagadougou in November-December 2011 in 47 subjects including 27 elderly subjects and 20 stakeholders responsible for the design and/or implementation of the PNSPA. These respondents were selected rattionally and were individually interviewed. Content analysis was therefore performed. The PNSPA is relevant in the Burkinabe context. It takes into account the health needs of elderly people in Burkina Faso as well as the availability of resources in health centres. It presents several consistency problems. It has rarely been implemented due to lack of political support and inadequate financial resources. The Burkina Faso PNSPA has encountered more difficulties than similar plans in Senegal and Mali, which have also encountered low implementation rates. This situation confirms that the elderly in sub-Saharan Africa constitute a top priority vulnerable population but which is neglected by all actors to varying degrees.

  12. Clinical implementation of AXB from AAA for breast: Plan quality and subvolume analysis.

    PubMed

    Guebert, Alexandra; Conroy, Leigh; Weppler, Sarah; Alghamdi, Majed; Conway, Jessica; Harper, Lindsay; Phan, Tien; Olivotto, Ivo A; Smith, Wendy L; Quirk, Sarah

    2018-05-01

    Two dose calculation algorithms are available in Varian Eclipse software: Anisotropic Analytical Algorithm (AAA) and Acuros External Beam (AXB). Many Varian Eclipse-based centers have access to AXB; however, a thorough understanding of how it will affect plan characteristics and, subsequently, clinical practice is necessary prior to implementation. We characterized the difference in breast plan quality between AXB and AAA for dissemination to clinicians during implementation. Locoregional irradiation plans were created with AAA for 30 breast cancer patients with a prescription dose of 50 Gy to the breast and 45 Gy to the regional node, in 25 fractions. The internal mammary chain (IMC CTV ) nodes were covered by 80% of the breast dose. AXB, both dose-to-water and dose-to-medium reporting, was used to recalculate plans while maintaining constant monitor units. Target coverage and organ-at-risk doses were compared between the two algorithms using dose-volume parameters. An analysis to assess location-specific changes was performed by dividing the breast into nine subvolumes in the superior-inferior and left-right directions. There were minimal differences found between the AXB and AAA calculated plans. The median difference between AXB and AAA for breast CTV V 95% , was <2.5%. For IMC CTV , the median differences V 95% , and V 80% were <5% and 0%, respectively; indicating IMC CTV coverage only decreased when marginally covered. Mean superficial dose increased by a median of 3.2 Gy. In the subvolume analysis, the medial subvolumes were "hotter" when recalculated with AXB and the lateral subvolumes "cooler" with AXB; however, all differences were within 2 Gy. We observed minimal difference in magnitude and spatial distribution of dose when comparing the two algorithms. The largest observable differences occurred in superficial dose regions. Therefore, clinical implementation of AXB from AAA for breast radiotherapy is not expected to result in changes in clinical practice for prescribing or planning breast radiotherapy. © 2018 The Authors. Journal of Applied Clinical Medical Physics published by Wiley Periodicals, Inc. on behalf of American Association of Physicists in Medicine.

  13. 50 CFR 600.1008 - Implementation plan and implementation regulations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Implementation plan and implementation... Capacity Reduction Framework § 600.1008 Implementation plan and implementation regulations. (a) As soon as... period, a proposed implementation plan and implementation regulations. During the public comment period...

  14. Application of life cycle thinking in multidisciplinary multistakeholder contexts for cross-sectoral planning and implementation of sustainable development projects.

    PubMed

    Thabrew, Lanka; Ries, Robert

    2009-07-01

    Development planning and implementation is a multifaceted and multiscale task mainly because of the involvement of multiple stakeholders across sectors and disciplines. Even though top-down sectoral planning is commonly practiced, bottom-up cross-sectoral planning involving all relevant stakeholders in a transdisciplinary learning environment has been recognized as a better option, especially if the goal is to drive development projects toward sustainable implementation (Rowe and Fudge 2003; Müller et al. 2005; Global Development Research Center 2008). Even though many planning approaches have this goal, there are limited decision frameworks that are suitable for achieving consensus among stakeholders from multiple disciplines with sectoral objectives and priorities. In most instances, the upstream and downstream effects of development decisions are not thoroughly investigated or communicated with the relevant stakeholders, strongly affecting cross-sectoral integration in the real world (Wiek, Brundiers, et al. 2006). This article presents methodological aspects of developing a stakeholder based life cycle assessment framework (SBLCA) for upstream-downstream decision analysis in a multistakeholder development planning context. The applicability of the framework is demonstrated using simple examples extracted from a pilot case study conducted in Sri Lanka for sustainable posttsunami reconstruction at a village scale. The applicability of SBLCA in specific planning stages, how it promotes transdisciplinary learning and cross-sectoral stakeholder integration in phases of project cycles, and how local stakeholders can practice life cycle thinking in their village development planning and implementation are discussed.

  15. Failure Mode and Effect Analysis (FMEA) may enhance implementation of clinical practice guidelines: An experience from the Middle East.

    PubMed

    Babiker, Amir; Amer, Yasser S; Osman, Mohamed E; Al-Eyadhy, Ayman; Fatani, Solafa; Mohamed, Sarar; Alnemri, Abdulrahman; Titi, Maher A; Shaikh, Farheen; Alswat, Khalid A; Wahabi, Hayfaa A; Al-Ansary, Lubna A

    2018-02-01

    Implementation of clinical practice guidelines (CPGs) has been shown to reduce variation in practice and improve health care quality and patients' safety. There is a limited experience of CPG implementation (CPGI) in the Middle East. The CPG program in our institution was launched in 2009. The Quality Management department conducted a Failure Mode and Effect Analysis (FMEA) for further improvement of CPGI. This is a prospective study of a qualitative/quantitative design. Our FMEA included (1) process review and recording of the steps and activities of CPGI; (2) hazard analysis by recording activity-related failure modes and their effects, identification of actions required, assigned severity, occurrence, and detection scores for each failure mode and calculated the risk priority number (RPN) by using an online interactive FMEA tool; (3) planning: RPNs were prioritized, recommendations, and further planning for new interventions were identified; and (4) monitoring: after reduction or elimination of the failure mode. The calculated RPN will be compared with subsequent analysis in post-implementation phase. The data were scrutinized from a feedback of quality team members using a FMEA framework to enhance the implementation of 29 adapted CPGs. The identified potential common failure modes with the highest RPN (≥ 80) included awareness/training activities, accessibility of CPGs, fewer advocates from clinical champions, and CPGs auditing. Actions included (1) organizing regular awareness activities, (2) making CPGs printed and electronic copies accessible, (3) encouraging senior practitioners to get involved in CPGI, and (4) enhancing CPGs auditing as part of the quality sustainability plan. In our experience, FMEA could be a useful tool to enhance CPGI. It helped us to identify potential barriers and prepare relevant solutions. © 2017 John Wiley & Sons, Ltd.

  16. An Explanatory Mixed-Methods Approach to Tracing "Career Pathways" Policy in Virginia: How School Counselors and Student Demographics Influence Implementation Fidelity

    ERIC Educational Resources Information Center

    Ormsmith, Michael Isaac

    2014-01-01

    This explanatory mixed-methods policy analysis describes how school counselors' thoughts and attitudes contribute to the implementation fidelity of the Academic and Career Plan (ACP) policy in a suburban Virginia school division. A quantitative survey investigated counselor thoughts about the policy, implementation behaviors, and counselor ideas…

  17. The Design and Implementation of an Alternative High School.

    ERIC Educational Resources Information Center

    Kritek, William J.

    The analysis of the planning for an implementation of an alternative high school in a large urban school system is the focus of this study. Interview data are used. This investigation draws on, and compliments, the previous literature on implementation. While most of the earlier studies look at failures, this one is based on an instance of…

  18. How healthcare systems evaluate their advance care planning initiatives: Results from a systematic review.

    PubMed

    Biondo, Patricia D; Lee, Lydia D; Davison, Sara N; Simon, Jessica E

    2016-09-01

    Advance care planning initiatives are being implemented across healthcare systems around the world, but how best to evaluate their implementation is unknown. To identify gaps and/or redundancies in current evaluative strategies to help healthcare systems develop future evaluative frameworks for ACP. Systematic review. Peer-reviewed and gray literature searches were conducted till February 2015 to answer: "What methods have healthcare systems used to evaluate implementation of advance care planning initiatives?" A PICOS framework was developed to identify articles describing the implementation and evaluation of a health system-level advance care planning initiative. Outcome measures were mapped onto a conceptual quality indicator framework based on the Institute of Medicine and Donabedian models of healthcare quality. A total of 46 studies met inclusion criteria for analysis. Most articles reported on single parts of a healthcare system (e.g. continuing care). The most common outcome measures pertained to document completion, followed by healthcare resource use. Patient-, family-, or healthcare provider-reported outcomes were less commonly measured. Concordance measures (e.g. dying in place of choice) were reported by only 26% of studies. The conceptual quality indicator framework identified gaps and redundancies in measurement and is presented as a potential foundation from which to develop a comprehensive advance care planning evaluation framework. Document completion is frequently used to evaluate advance care planning program implementation; capturing the quality of care appears to be more difficult. This systematic review provides health system administrators with a comprehensive summary of measures used to evaluate advance care planning and may identify gaps in evaluation within their local context. © The Author(s) 2016.

  19. Understanding what asthma plans mean: a linguistic analysis of terminology used in published texts.

    PubMed

    Ring, Nicola; Pinnock, Hilary; Wilson, Caroline; Hoskins, Gaylor; Jepson, Ruth; Wyke, Sally; Sheikh, Aziz

    2011-06-01

    To identify from the literature what terms are used for 'asthma plans', with what meaning, and in what context(s). Linguistic analysis of a selected body of asthma literature from 1989-2009. A wide range of asthma plan terminology was evident, with terms such as 'action plans', 'self-management plans' and 'treatment plans' being applied inconsistently and synonymously. For individual patients the term 'asthma plan' can describe a clinically-determined list of prescribed medication, an agreed plan to guide self-management of changing symptoms, or a more holistic 'living with asthma' plan. In some contexts the term 'asthma plan' was also used to describe an organisational system of care, which causes further ambiguity. Within the literature, a plethora of terms is used inconsistently and with varied meaning. This is a potential, but previously unrecognised, barrier to asthma plan implementation. A taxonomy of asthma plans and a standardised definitions of terms is required.

  20. CWA 15793 2011 Planning and Implementation Tool

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gross, Alan; Nail, George

    This software, built on an open source platform called Electron (runs on Chromium and Node.js), is designed to assist organizations in the implementation of a biorisk management system consistent with the requirements of the international, publicly available guidance document CEN Workshop Agreement 15793:2011 (CWA 15793). The software includes tools for conducting organizational gap analysis against CWA 15793 requirements, planning tools to support the implementation of CWA 15793 requirements, and performance monitoring support. The gap analysis questions are based on the text of CWA 15793, and its associated guidance document, CEN Workshop Agreement 16393:2012. The authors have secured permission from themore » publisher of CWA 15793, the European Committee for Standardization (CEN), to use language from the document in the software, with the understanding that the software will be made available freely, without charge.« less

  1. Project Career REACH: Marketing Strategies for Effective Guidance Programs.

    ERIC Educational Resources Information Center

    Bollendorf, Marsha; And Others

    1990-01-01

    Outlines the practical marketing strategies used to implement Project Career REACH, a career development program for high school freshmen. Marketing basics for guidance programs are discussed, including mission analysis, market analysis, resource analysis, strategic planning, and evaluation. (TE)

  2. Proposed Approval of California Air Plan Revision; Yolo-Solano Air Quality Management District; VOC Source Categories; Negative Declarations

    EPA Pesticide Factsheets

    EPA is taking final action to approve a revision to the YSAQMD portion of the California SIP concerning YSAQMD negative declarations for several VOC source categories included in its RACT State Implementation Plan Analysis.

  3. The Method of Multiple Spatial Planning Basic Map

    NASA Astrophysics Data System (ADS)

    Zhang, C.; Fang, C.

    2018-04-01

    The "Provincial Space Plan Pilot Program" issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the plan, implementation of various types of investment projects and space management and control departments involved in military construction projects in parallel to approve and approve, and improve the efficiency of administrative approval. The space planning system should be set up to delimit the control limits for the development of production, life and ecological space, and the control of use is implemented. On the one hand, it is necessary to clarify the functional orientation between various kinds of planning space. On the other hand, it is necessary to achieve "multi-compliance" of various space planning. Multiple spatial planning intergration need unified and standard basic map(geographic database and technical specificaton) to division of urban, agricultural, ecological three types of space and provide technical support for the refinement of the space control zoning for the relevant planning. The article analysis the main space datum, the land use classification standards, base map planning, planning basic platform main technical problems. Based on the geographic conditions, the results of the census preparation of spatial planning map, and Heilongjiang, Hainan many rules combined with a pilot application.

  4. Institutional Mapping Towards Developing a Framework for Sustainable Marine Spatial Planning

    NASA Astrophysics Data System (ADS)

    Yatim, M. H. M.; Omar, A. H.; Abdullah, N. M.; Hashim, N. M.

    2016-09-01

    Within few years before, the urge to implement the marine spatial planning is due to increasing numbers of marine activities that will lead into uncertainties of rights, restrictions and responsibilities of the maritime nations. Marine authorities in this situation that deal with national rights and legislations are the government institutions that engage with marine spatial information. There are several elements to be considered when dealing with the marine spatial planning; which is institutional sustainability governance. Providing the importance of marine spatial planning towards sustainable marine spatial governance, the focus should highlight the role marine institutions towards sustainable marine plan. The iterative process of marine spatial planning among marine institutions is important as the spatial information governance is scattered from reflected rights, restrictions and responsibilities of marine government institutions. Malaysia is one of the maritime nations that conjures the initial step towards establishing the sustainable marine spatial planning. In order to have sustainable institutions in marine spatial planning process, it involves four main stages; planning phase, plan evaluation phase, implementation phase and post implementation phase. Current situation has witnessed the unclear direction and role of marine government institutions to manage the marine spatial information. This review paper is focusing on the institutional sustainability upon interaction of marine government institutions in the marine spatial planning process based on Institutional Analysis Framework. The outcome of the integration of institutional sustainability and marine spatial planning process will propose a framework of marine institutional sustainable plan.

  5. Evaluating the impact of equity focused health impact assessment on health service planning: three case studies.

    PubMed

    Harris-Roxas, Ben; Haigh, Fiona; Travaglia, Joanne; Kemp, Lynn

    2014-09-05

    Health impact assessment has been identified internationally as a mechanism to ensure potential health impacts and health equity impacts of proposals are considered before implementation. This paper looks at the impact of three equity focused health impact assessments (EFHIAs) of health service plans on subsequent decision-making and implementation, and then utilises these findings to test and refine an existing conceptual framework for evaluating the impact and effectiveness of health impact assessments for use in relation to EFHIAs. Case study analysis of three EFHIAs conducted on health sector plans in New South Wales, Australia. Data was drawn from 14 semi-structured interviews and the analysis of seven related documents (draft plans and EFHIA reports). The case studies showed that the EFHIAs all had some impact on the decision-making about the plans and their implementation, most clearly in relation to participants' understandings of equity and in the development of options for modifying service plans to ensure this was addressed. The timing of the EFHIA and individual responses to the EFHIA process and its recommendations were identified as critical factors influencing the impact of the EFHIAs. Several modifications to the conceptual framework are identified, principally adding factors to recognise the role individuals play in influencing the impact and effectiveness of EFHIAs. EFHIA has the potential to improve the consideration of health equity in health service planning processes, though a number of contextual and individual factors affect this. Current approaches can be strengthened by taking into account personal and organisational responses to the EFHIA process.

  6. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 7: PEP logistics and training plan requirements

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Recommendations for logistics activities and logistics planning are presented based on the assumption that a system prime contractor will perform logistics functions to support all program hardware and will implement a logistics system to include the planning and provision of products and services to assure cost effective coverage of the following: maintainability; maintenance; spares and supply support; fuels; pressurants and fluids; operations and maintenance documentation training; preservation, packaging and packing; transportation and handling; storage; and logistics management information reporting. The training courses, manpower, materials, and training aids required will be identified and implemented in a training program.

  7. Implementing Earned Value Management in the CxP EVA Systems Project Office

    NASA Technical Reports Server (NTRS)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  8. Camp's "Disneyland" Effect.

    ERIC Educational Resources Information Center

    Renville, Gary

    1999-01-01

    Describes the positive mental, physical, and social growth impacts that the camping experience had on the author, and urges camp program evaluation to plan and implement such changes. Sidebar lists steps of effective evaluation: program goals and objectives, goals of evaluation, implementation of evaluation, data analysis, and findings and…

  9. Cost Benefit Analysis of Enterprise Resource Planning System for the Naval Postgraduate School

    DTIC Science & Technology

    2002-06-01

    Department-wide introduction and use of appropriate commercial financial practices and reporting • Develop a strategic plan for implementing a business... Development of a process innovation approach given the current capabilities of the system, recommend possible alternatives to close gaps. E

  10. Planned Change in Agrarian Countries.

    ERIC Educational Resources Information Center

    Niehoff, Arthur H.

    The report provides operationally relevant concepts and guidelines for persons responsible for planning and implementing development projects in agrarian countries. A framework for describing or evaluating the conduct of development projects is proposed, and applied to the results of an analysis of 203 case studies of past projects. Influences,…

  11. Pathways to Program Success: A Qualitative Comparative Analysis (QCA) of Communities Putting Prevention to Work Case Study Programs

    PubMed Central

    Kane, Heather; Hinnant, Laurie; Day, Kristine; Council, Mary; Tzeng, Janice; Soler, Robin; Chambard, Megan; Roussel, Amy; Heirendt, Wendy

    2016-01-01

    Objective To examine the elements of capacity, a measure of organizational resources supporting program implementation that result in successful completion of public health program objectives in a public health initiative serving 50 communities. Design We used crisp set Qualitative Comparative Analysis (QCA) to analyze case study and quantitative data collected during the evaluation of the Communities Putting Prevention to Work (CPPW) program. Setting CPPW awardee program staff and partners implemented evidence-based public health improvements in counties, cities, and organizations (eg, worksites, schools). Participants Data came from case studies of 22 CPPW awardee programs that implemented evidence-based, community-and organizational-level public health improvements. Intervention Program staff implemented a range of evidence-based public health improvements related to tobacco control and obesity prevention. Main Outcome Measure The outcome measure was completion of approximately 60% of work plan objectives. Results Analysis of the capacity conditions revealed 2 combinations for completing most work plan objectives: (1) having experience implementing public health improvements in combination with having a history of collaboration with partners; and (2) not having experience implementing public health improvements in combination with having leadership support. Conclusion Awardees have varying levels of capacity. The combinations identified in this analysis provide important insights into how awardees with different combinations of elements of capacity achieved most of their work plan objectives. Even when awardees lack some elements of capacity, they can build it through strategies such as hiring staff and engaging new partners with expertise. In some instances, lacking 1 or more elements of capacity did not prevent an awardee from successfully completing objectives. Implications for Policy & Practice These findings can help funders and practitioners recognize and assemble different aspects of capacity to achieve more successful programs; awardees can draw on extant organizational strengths to compensate when other aspects of capacity are absent. PMID:27598714

  12. Climate change adaptation frameworks: an evaluation of plans for coastal Suffolk, UK

    NASA Astrophysics Data System (ADS)

    Armstrong, J.; Wilby, R.; Nicholls, R. J.

    2015-11-01

    This paper asserts that three principal frameworks for climate change adaptation can be recognised in the literature: scenario-led (SL), vulnerability-led (VL) and decision-centric (DC) frameworks. A criterion is developed to differentiate these frameworks in recent adaptation projects. The criterion features six key hallmarks as follows: (1) use of climate model information; (2) analysis of metrics/units; (3) socio-economic knowledge; (4) stakeholder engagement; (5) adaptation of implementation mechanisms; (6) tier of adaptation implementation. The paper then tests the validity of this approach using adaptation projects on the Suffolk coast, UK. Fourteen adaptation plans were identified in an online survey. They were analysed in relation to the hallmarks outlined above and assigned to an adaptation framework. The results show that while some adaptation plans are primarily SL, VL or DC, the majority are hybrid, showing a mixture of DC/VL and DC/SL characteristics. Interestingly, the SL/VL combination is not observed, perhaps because the DC framework is intermediate and attempts to overcome weaknesses of both SL and VL approaches. The majority (57 %) of adaptation projects generated a risk assessment or advice notes. Further development of this type of framework analysis would allow better guidance on approaches for organisations when implementing climate change adaptation initiatives, and other similar proactive long-term planning.

  13. Climate change adaptation frameworks: an evaluation of plans for coastal, Suffolk, UK

    NASA Astrophysics Data System (ADS)

    Armstrong, J.; Wilby, R.; Nicholls, R. J.

    2015-06-01

    This paper asserts that three principal frameworks for climate change adaptation can be recognised in the literature: Scenario-Led (SL), Vulnerability-Led (VL) and Decision-Centric (DC) frameworks. A criterion is developed to differentiate these frameworks in recent adaptation projects. The criterion features six key hallmarks as follows: (1) use of climate model information; (2) analysis metrics/units; (3) socio-economic knowledge; (4) stakeholder engagement; (5) adaptation implementation mechanisms; (6) tier of adaptation implementation. The paper then tests the validity of this approach using adaptation projects on the Suffolk coast, UK. Fourteen adaptation plans were identified in an online survey. They were analysed in relation to the hallmarks outlined above and assigned to an adaptation framework. The results show that while some adaptation plans are primarily SL, VL or DC, the majority are hybrid showing a mixture of DC/VL and DC/SL characteristics. Interestingly, the SL/VL combination is not observed, perhaps because the DC framework is intermediate and attempts to overcome weaknesses of both SL and VL approaches. The majority (57 %) of adaptation projects generated a risk assessment or advice notes. Further development of this type of framework analysis would allow better guidance on approaches for organisations when implementing climate change adaptation initiatives, and other similar proactive long-term planning.

  14. 77 FR 43205 - Notice of Data Availability for Approval, Disapproval and Promulgation of Implementation Plans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... Haze State Implementation Plan; Federal Implementation Plan for Regional Haze AGENCY: Environmental... (SIP) revision submitted by the State of Wyoming on January 12, 2011, that addresses regional haze...; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze; Proposed Rule (77...

  15. 78 FR 28775 - Approval and Promulgation of Implementation Plans; North Carolina; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Promulgation of Implementation Plans; North Carolina; State Implementation Plan Miscellaneous Revisions AGENCY... a revision to the North Carolina State Implementation Plan submitted on February 3, 2010, through... particulate matter found in the Code of Federal Regulations. In the Final Rules Section of this Federal...

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Noel, Camille E.; Gutti, VeeraRajesh; Bosch, Walter

    Purpose: To quantify the potential impact of the Integrating the Healthcare Enterprise–Radiation Oncology Quality Assurance with Plan Veto (QAPV) on patient safety of external beam radiation therapy (RT) operations. Methods and Materials: An institutional database of events (errors and near-misses) was used to evaluate the ability of QAPV to prevent clinically observed events. We analyzed reported events that were related to Digital Imaging and Communications in Medicine RT plan parameter inconsistencies between the intended treatment (on the treatment planning system) and the delivered treatment (on the treatment machine). Critical Digital Imaging and Communications in Medicine RT plan parameters were identified.more » Each event was scored for importance using the Failure Mode and Effects Analysis methodology. Potential error occurrence (frequency) was derived according to the collected event data, along with the potential event severity, and the probability of detection with and without the theoretical implementation of the QAPV plan comparison check. Failure Mode and Effects Analysis Risk Priority Numbers (RPNs) with and without QAPV were compared to quantify the potential benefit of clinical implementation of QAPV. Results: The implementation of QAPV could reduce the RPN values for 15 of 22 (71%) of evaluated parameters, with an overall average reduction in RPN of 68 (range, 0-216). For the 6 high-risk parameters (>200), the average reduction in RPN value was 163 (range, 108-216). The RPN value reduction for the intermediate-risk (200 > RPN > 100) parameters was (0-140). With QAPV, the largest RPN value for “Beam Meterset” was reduced from 324 to 108. The maximum reduction in RPN value was for Beam Meterset (216, 66.7%), whereas the maximum percentage reduction was for Cumulative Meterset Weight (80, 88.9%). Conclusion: This analysis quantifies the value of the Integrating the Healthcare Enterprise–Radiation Oncology QAPV implementation in clinical workflow. We demonstrate that although QAPV does not provide a comprehensive solution for error prevention in RT, it can have a significant impact on a subset of the most severe clinically observed events.« less

  17. Implementing Response to Intervention: Use of Innovation Configuration Maps within a Multiple-Case Study Analysis

    ERIC Educational Resources Information Center

    Fernando, Sheara

    2010-01-01

    The success of an implementation effort depends on the ability for a system to utilize the innovation effectively; the effective usage of an innovation can be determined by monitoring for program integrity and fidelity, and assessing the degree to which the program implementation matches the intended plan (Fixsen, Blase, Horner, & Sugai 2007). The…

  18. A Network Analysis Perspective to Implementation: The Example of Health Links to Promote Coordinated Care.

    PubMed

    Yousefi Nooraie, Reza; Khan, Sobia; Gutberg, Jennifer; Baker, G Ross

    2018-01-01

    Although implementation models broadly recognize the importance of social relationships, our knowledge about applying social network analysis (SNA) to formative, process, and outcome evaluations of health system interventions is limited. We explored applications of adopting an SNA lens to inform implementation planning, engagement and execution, and evaluation. We used Health Links, a province-wide program in Canada aiming to improve care coordination among multiple providers of high-needs patients, as an example of a health system intervention. At the planning phase, an SNA can depict the structure, network influencers, and composition of clusters at various levels. It can inform the engagement and execution by identifying potential targets (e.g., opinion leaders) and by revealing structural gaps and clusters. It can also be used to assess the outcomes of the intervention, such as its success in increasing network connectivity; changing the position of certain actors; and bridging across specialties, organizations, and sectors. We provided an overview of how an SNA lens can shed light on the complexity of implementation along the entire implementation pathway, by revealing the relational barriers and facilitators, the application of network-informed and network-altering interventions, and testing hypotheses on network consequences of the implementation.

  19. Pre-implementation studies of a workforce planning tool for nurse staffing and human resource management in university hospitals.

    PubMed

    van Oostveen, Catharina J; Ubbink, Dirk T; Mens, Marian A; Pompe, Edwin A; Vermeulen, Hester

    2016-03-01

    To investigate the reliability, validity and feasibility of the RAFAELA workforce planning system (including the Oulu patient classification system - OPCq), before deciding on implementation in Dutch hospitals. The complexity of care, budgetary restraints and demand for high-quality patient care have ignited the need for transparent hospital workforce planning. Nurses from 12 wards of two university hospitals were trained to test the reliability of the OPCq by investigating the absolute agreement of nursing care intensity (NCI) measurements among nurses. Validity was tested by assessing whether optimal NCI/nurse ratio, as calculated by a regression analysis in RAFAELA, was realistic. System feasibility was investigated through a questionnaire among all nurses involved. Almost 67 000 NCI measurements were performed between December 2013 and June 2014. Agreement using the OPCq varied between 38% and 91%. For only 1 in 12 wards was the optimal NCI area calculated judged as valid. Although the majority of respondents was positive about the applicability and user-friendliness, RAFAELA was not accepted as useful workforce planning system. Nurses' performance using the RAFAELA system did not warrant its implementation. Hospital managers should first focus on enlarging the readiness of nurses regarding the implementation of a workforce planning system. © 2015 John Wiley & Sons Ltd.

  20. 78 FR 28007 - Submission for Review: Federal Employees' Group Life Insurance (FEGLI) Implementation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ... OFFICE OF PERSONNEL MANAGEMENT Submission for Review: Federal Employees' Group Life Insurance (FEGLI) Implementation Questionnaire for Tribal Employers AGENCY: U.S. Office of Personnel Management. ACTION: 60-Day Notice and request for comments. SUMMARY: The Office of Planning and Policy Analysis...

  1. 77 FR 41132 - Air Quality Implementation Plans; Alabama; Attainment Plan for the Alabama Portion of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-12

    ... modeling demonstration should include supporting technical analyses and descriptions of all relevant....5 and NO X . The attainment demonstration includes: Technical analyses that locate, identify, and... modeling analysis is a complex technical evaluation that began with selection of the modeling system. The...

  2. 76 FR 14584 - Approval and Promulgation of Air Quality Implementation Plans; Montana; Attainment Plan for Libby...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... the timeframe provided in the statute. It must also include supporting technical analyses and... emissions inventory (EI), a woodstove air pollution control calculation, and a technical analysis showing... year (2010); and (2) an attainment demonstration consisting of: (a) Technical analyses that locate...

  3. ESL and Internationalization at Purdue University: A History and Analysis

    ERIC Educational Resources Information Center

    Haan, Jennifer E.

    2009-01-01

    With the ever growing cultural and linguistic diversity at institutions of higher education, local and institutional language planning is becoming increasingly important. By examining university policies and planning processes, ESL professionals can more appropriately advocate for their students, as well as create and implement language policies…

  4. 40 CFR 52.2565 - Original identification of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Amended Regulations VI and VII, and an Identification and Analysis of the Impact of the 1979 West Virginia... State of West Virginia on November 4, 1983 which establishes an Ambient Air Quality Monitoring Network...) Revision to the State implementation plan consisting of a good engineering practice (GEP) for stack heights...

  5. 40 CFR 52.2565 - Original identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Amended Regulations VI and VII, and an Identification and Analysis of the Impact of the 1979 West Virginia... State of West Virginia on November 4, 1983 which establishes an Ambient Air Quality Monitoring Network...) Revision to the State implementation plan consisting of a good engineering practice (GEP) for stack heights...

  6. 40 CFR 52.2565 - Original identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Amended Regulations VI and VII, and an Identification and Analysis of the Impact of the 1979 West Virginia... State of West Virginia on November 4, 1983 which establishes an Ambient Air Quality Monitoring Network...) Revision to the State implementation plan consisting of a good engineering practice (GEP) for stack heights...

  7. 40 CFR 52.2565 - Original identification of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Amended Regulations VI and VII, and an Identification and Analysis of the Impact of the 1979 West Virginia... State of West Virginia on November 4, 1983 which establishes an Ambient Air Quality Monitoring Network...) Revision to the State implementation plan consisting of a good engineering practice (GEP) for stack heights...

  8. A Historical Analysis of the Leadership and Strategic Plan of Chancellor Stephen R. Portch in the University System of Georgia

    ERIC Educational Resources Information Center

    Fairchild-Pierce, Jennifer Elis

    2008-01-01

    This dissertation provides historical insight into the design and implementation of one strategic plan of a public higher education system in an effort to inform future similar strategic planning processes. On July 1, 1994, the Board of Regents appointed Stephen R. Portch the ninth Chancellor of the University System of Georgia. The timing was…

  9. Child Care and Development Fund: Report of State Plans for the Period 10/01/99 to 9/30/01.

    ERIC Educational Resources Information Center

    Stoney, Louise; Stanton, Nina

    The Personal Responsibility and Work Opportunity Reconciliation Act requires each state to submit a biennial plan to implement the Child Care and Development Fund (CCDF). This report is based on the approved State Plans for the period October 1, 1999 to September 30, 2001. The analysis includes information from 48 states, the District of Columbia,…

  10. 76 FR 6376 - Approval of Air Quality Implementation Plans; Indiana and Ohio; Disapproval of Interstate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ... impact. EPA stated that the State's conclusion should be supported by an adequate technical analysis. EPA... technical analysis, no such analysis was provided by IDEM justifying that these measures are sufficient to... a State's [[Page 6379

  11. Approved Air Quality Implementation Plans in Region 10

    EPA Pesticide Factsheets

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  12. 78 FR 69625 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ...] Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision AGENCY...) is proposing to approve a revision to the New York State Implementation Plan (SIP) for ozone... air quality standards for ozone. DATES: Comments must be received on or before December 20, 2013...

  13. 77 FR 13974 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ... Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision AGENCY: Environmental... a proposed revision to the New York State Implementation Plan (SIP) for ozone concerning the control... national ambient air quality standards for ozone. DATES: Effective Date: This rule will be effective April...

  14. Application of automatic vehicle location in law enforcement: An introductory planning guide

    NASA Technical Reports Server (NTRS)

    Hansen, G. R.; Leflang, W. G.

    1976-01-01

    A set of planning guidelines for the application of automatic vehicle location (AVL) to law enforcement is presented. Some essential characteristics and applications of AVL are outlined; systems in the operational or planning phases are discussed. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. A detailed description of a typical law enforcement AVL system, and a list of vendor sources are given in appendixes.

  15. Quality Assurance with Plan Veto: reincarnation of a record and verify system and its potential value.

    PubMed

    Noel, Camille E; Gutti, Veerarajesh; Bosch, Walter; Mutic, Sasa; Ford, Eric; Terezakis, Stephanie; Santanam, Lakshmi

    2014-04-01

    To quantify the potential impact of the Integrating the Healthcare Enterprise-Radiation Oncology Quality Assurance with Plan Veto (QAPV) on patient safety of external beam radiation therapy (RT) operations. An institutional database of events (errors and near-misses) was used to evaluate the ability of QAPV to prevent clinically observed events. We analyzed reported events that were related to Digital Imaging and Communications in Medicine RT plan parameter inconsistencies between the intended treatment (on the treatment planning system) and the delivered treatment (on the treatment machine). Critical Digital Imaging and Communications in Medicine RT plan parameters were identified. Each event was scored for importance using the Failure Mode and Effects Analysis methodology. Potential error occurrence (frequency) was derived according to the collected event data, along with the potential event severity, and the probability of detection with and without the theoretical implementation of the QAPV plan comparison check. Failure Mode and Effects Analysis Risk Priority Numbers (RPNs) with and without QAPV were compared to quantify the potential benefit of clinical implementation of QAPV. The implementation of QAPV could reduce the RPN values for 15 of 22 (71%) of evaluated parameters, with an overall average reduction in RPN of 68 (range, 0-216). For the 6 high-risk parameters (>200), the average reduction in RPN value was 163 (range, 108-216). The RPN value reduction for the intermediate-risk (200 > RPN > 100) parameters was (0-140). With QAPV, the largest RPN value for "Beam Meterset" was reduced from 324 to 108. The maximum reduction in RPN value was for Beam Meterset (216, 66.7%), whereas the maximum percentage reduction was for Cumulative Meterset Weight (80, 88.9%). This analysis quantifies the value of the Integrating the Healthcare Enterprise-Radiation Oncology QAPV implementation in clinical workflow. We demonstrate that although QAPV does not provide a comprehensive solution for error prevention in RT, it can have a significant impact on a subset of the most severe clinically observed events. Copyright © 2014 Elsevier Inc. All rights reserved.

  16. [Ethical principles of management and planning during influenza pandemic].

    PubMed

    Kubar', O I; Asatrian, A Zh

    2012-01-01

    The article is dedicated to an actual problem of ethical component inclusion into the system of management and planning of epidemic control measures during threat emergence and in the course of influenza pandemic (epidemic) progress. Data regarding development of international ethical guidelines during influenza including WHO recommendations are presented and analysis of normative documents in Russian Federation is given. A necessity of comprehension and accounting of ethical values in pandemic preparedness is shown, main directions of action and responsibility are revealed. Key ethical positions of planning and implementation of measures during influenza pandemic are outlined, compliance with those determines the level of public support and thus provides the effectiveness of the implemented measures.

  17. Teacher Decision Making and the Implementation of an Integrated Arts Curriculum

    ERIC Educational Resources Information Center

    Devono, Mary K.

    2009-01-01

    This study examines the impact of teacher decision making upon implementing an integrated arts curriculum. Qualitative research methods, including interviews, lesson plan document analysis, and teacher discussion of student artwork comprise the research data from eight elementary classroom teachers. This study is designed to add to the descriptive…

  18. 78 FR 37226 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... Implementation Study. OMB No.: 0970-0398. Description: The Office of Data Analysis, Research, and Evaluation (HHS... Planning, Research, and Evaluation (HHS/ACF/OPRE) in the Administration for Children and Families (ACF... designed and implemented in the field, collect performance measure data for PREP programs, and assess the...

  19. A Contingent Analysis of the Relationship between IS Implementation Strategies and IS Success.

    ERIC Educational Resources Information Center

    Kim, Sang-Hoon; Lee, Jinjoo

    1991-01-01

    Considers approaches to dealing with user attitudes toward newly implemented information systems (IS), and suggests that behavioral management strategies relevant to IS fall into three categories: (1) empirical/rational; (2) normative/reeducative; and (3) power/coercive, based on "planned change" theories. An integrative contingent model…

  20. Exploratory study on Marine SDI implementation in Malaysia

    NASA Astrophysics Data System (ADS)

    Tarmidi, Zakri; Mohd Shariff, Abdul Rashid; Rodzi Mahmud, Ahmad; Zaiton Ibrahim, Zelina; Halim Hamzah, Abdul

    2016-06-01

    This paper discusses the explanatory study of the implementation of spatial data sharing between Malaysia's marine organisations. The survey method was selected with questionnaire as an instrument for data collection and analysis. The aim of the questionnaire was to determine the critical factors in enabling marine spatial data sharing in Malaysia, and the relationship between these indicators. A questionnaire was sent to 48 marine and coastal organisations in Malaysia, with 84.4% of respondents answering the questionnaire. The respondents selected were people who involved directly with GIS application in the organisations. The results show there are three main issues in implementing spatial data sharing; (1) GIS planning and implementation in the organisation, (2) spatial data sharing knowledge and implementation in the organisation and (3) collaboration to enable spatial data sharing within and between organisations. To improve GIS implementation, spatial data sharing implementation and collaboration in enabling spatial data sharing, a conceptual collaboration model was proposed with components of marine GIS strategic planning, spatial data sharing strategies and collaboration strategy.

  1. Approved Air Quality Implementation Plans in The Virgin Islands

    EPA Pesticide Factsheets

    This site contains information about air quality regulations called State Implementation Plans (SIPs), Federal Implementation Plans (FIPs), and Tribal Implementation Plans (TIPs) approved by EPA within the U.S. Virgin Islands.

  2. Items Supporting the Hanford Internal Dosimetry Program Implementation of the IMBA Computer Code

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carbaugh, Eugene H.; Bihl, Donald E.

    2008-01-07

    The Hanford Internal Dosimetry Program has adopted the computer code IMBA (Integrated Modules for Bioassay Analysis) as its primary code for bioassay data evaluation and dose assessment using methodologies of ICRP Publications 60, 66, 67, 68, and 78. The adoption of this code was part of the implementation plan for the June 8, 2007 amendments to 10 CFR 835. This information release includes action items unique to IMBA that were required by PNNL quality assurance standards for implementation of safety software. Copie of the IMBA software verification test plan and the outline of the briefing given to new users aremore » also included.« less

  3. Promoting public health through state cancer control plans: a review of capacity and sustainability.

    PubMed

    Ory, Marcia G; Sanner, Brigid; Vollmer Dahlke, Deborah; Melvin, Cathy L

    2015-01-01

    The Centers for Disease Prevention and Control's National Comprehensive Cancer Control (CCC) Program oversee CCC programs designed to develop and implement CCC plans via CCC coalitions, alliances, or consortia of program stakeholders. We reviewed 40 up-to-date plans for states and the District of Columbia in order to assess how capacity building and sustainability, two evidence-based practices necessary for organizational readiness, positive growth, and maintenance are addressed. We employed an electronic key word search, supplemented by full text reviews of each plan to complete a content analysis of the CCC plans. Capacity is explicitly addressed in just over half of the plans (53%), generally from a conceptual point of view, with few specifics as to how capacity will be developed or enhanced. Roles and responsibilities, timelines for action, and measurements for evaluation of capacity building are infrequently mentioned. Almost all (92%) of the 40 up-to-date plans address sustainability on at least a cursory level, through efforts aimed at funding or seeking funding, policy initiatives, and/or partnership development. However, few details as to how these strategies will be implemented are found in the plans. We present the Texas plan as a case study offering detailed insight into how one plan incorporated capacity building and sustainability into its development and implementation. Training, technical assistance, templates, and tools may help CCC coalition members address capacity and sustainability in future planning efforts and assure the inclusion of capacity building and sustainability approaches in CCC plans at the state, tribal, territorial, and jurisdiction levels.

  4. 77 FR 48061 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State Implementation Plan...'s limited approval of Pennsylvania's Regional Haze State Implementation Plan (SIP). DATES: Effective... announcing our limited approval of Pennsylvania's Regional Haze SIP. In this document, we inadvertently...

  5. "If You Don't Do Parking Management .. Forget Your Behaviour Change, It's Not Going to Work.": Health and Transport Practitioner Perspectives on Workplace Active Travel Promotion.

    PubMed

    Petrunoff, Nick; Rissel, Chris; Wen, Li Ming

    2017-01-01

    After having conducted two studies of the effectiveness of workplace travel plans for promoting active travel, we investigated health and transport practitioners' perspectives on implementing workplace travel plans to share some of the lessons learnt. The objectives of this study were to describe perceived elements of effective workplace travel plans, barriers and enablers to workplace travel planning, their experiences of working with the other profession on travel plan implementation, their recommendations for workplace travel planning, and also to explore similarities and differences in transport and health practitioner perspectives. Fourteen health and ten transport practitioners who had prior involvement in workplace travel plan programs were purposefully selected from workplaces in Australia. We conducted 20 in-depth interviews since data saturation had been reached at this point, and data were subject to framework analysis. Perceived essential elements of effective workplace travel plans included parking management; leadership, organisational commitment and governance; skills and other resources like a dedicated travel plan coordinator; and, pre-conditions including supportive transport infrastructure in the surrounds. Recommendations for promoting travel plans included supportive government policy, focusing on business benefits and working at different scales of implementation (e.g. single large worksites and business precincts). Health and transport practitioner perspectives differed, with transport practitioners believing that parking management is the key action for managing travel demand at a worksite. Health practitioners implementing travel plans may require training including concepts of travel demand management, and support from transport planners on parking management strategies. Promoting an understanding of the shared travel behaviour change skills of transport and health practitioners may assist further collaboration. For take-up by organisations to be of sufficient scale to create meaningful population level reductions in driving and increases in active travel, promotion and travel plans should be focused on the priorities of the organisations. Supportive government policy is also required.

  6. “If You Don’t Do Parking Management .. Forget Your Behaviour Change, It’s Not Going to Work.”: Health and Transport Practitioner Perspectives on Workplace Active Travel Promotion

    PubMed Central

    Rissel, Chris; Wen, Li Ming

    2017-01-01

    Objectives After having conducted two studies of the effectiveness of workplace travel plans for promoting active travel, we investigated health and transport practitioners’ perspectives on implementing workplace travel plans to share some of the lessons learnt. The objectives of this study were to describe perceived elements of effective workplace travel plans, barriers and enablers to workplace travel planning, their experiences of working with the other profession on travel plan implementation, their recommendations for workplace travel planning, and also to explore similarities and differences in transport and health practitioner perspectives. Materials and Methods Fourteen health and ten transport practitioners who had prior involvement in workplace travel plan programs were purposefully selected from workplaces in Australia. We conducted 20 in-depth interviews since data saturation had been reached at this point, and data were subject to framework analysis. Results Perceived essential elements of effective workplace travel plans included parking management; leadership, organisational commitment and governance; skills and other resources like a dedicated travel plan coordinator; and, pre-conditions including supportive transport infrastructure in the surrounds. Recommendations for promoting travel plans included supportive government policy, focusing on business benefits and working at different scales of implementation (e.g. single large worksites and business precincts). Health and transport practitioner perspectives differed, with transport practitioners believing that parking management is the key action for managing travel demand at a worksite. Conclusions Health practitioners implementing travel plans may require training including concepts of travel demand management, and support from transport planners on parking management strategies. Promoting an understanding of the shared travel behaviour change skills of transport and health practitioners may assist further collaboration. For take-up by organisations to be of sufficient scale to create meaningful population level reductions in driving and increases in active travel, promotion and travel plans should be focused on the priorities of the organisations. Supportive government policy is also required. PMID:28135301

  7. Accountability in Adult Farmer Education

    ERIC Educational Resources Information Center

    Callanan, Paul J.; Jackson, Dennis L.

    1978-01-01

    Two instructors write about some ideas they have implemented in their farm management program to help measure accountability. They describe the Minnesota Farm Business Analysis, use of the analysis summary book, income tax management, and budgeting and cash flow planning. (MF)

  8. CINRG: Infrastructure for Clinical Trials in Duchenne Dystrophy

    DTIC Science & Technology

    2013-09-01

    research centers sharing a common goal of improving the quality of life of neuromuscular disease patients by cooperative planning , implementation, analysis...discrepancies were noted surrounding the regulatory binder, consent process and data records. The site personnel have a scheduled plan with the CINRG CC...missing long term follow-up visits). The project manager also reviewed the study records to date while onsite. A high priority plan was developed with the

  9. Study of Educational Hospital Employees’ Satisfaction with the Administration of the Health Reform Plan in Ghazvin, 2015

    PubMed Central

    Gholami, Soheyla; Oveisi, Sonia; Ghamari, Fatemeh; Etedal, Mahboobeh Ghorban; Rajaee, Roya

    2015-01-01

    Introduction Employee satisfaction is considered to be an important component in the promotion of service quality and increased efficiency and effectiveness in the reform plan for a healthcare system. Neglecting this issue could result in a lack of success in achieving the healthcare system’s objectives. The healthcare reform plan is being implemented to achieve the objectives of the healthcare system. Thus, given the key role of hospital employees in implementing the reform plan, the aim of this study was to determine the levels of hospital employees’ satisfaction with their jobs. Methods This was a qualitative study in 2015 that included thematic analysis, and 138 employees of the Kosar, Rajaii, and Ghods Hospitals participated. Data were collected using semi-structured interviews, and the data were analyzed using content analysis. Results After analyzing the data collected by interviewing the employees, 132 codes were identified. The codes were classified into five general concepts including opinions about 1) the reform plan and its administrative barriers, 2) changes in visits, 3) changes in working conditions, 4) changes in salaries and 5) General satisfaction of personnel. Conclusion Increasing workloads, stagnant salaries, and the shortage of personnel were the main factors that reduced the satisfaction of the hospitals’ employees with the administration of the healthcare reform plan. PMID:26767104

  10. User Perceptions of the Implementation of an Electronic Medication Management System in a Paediatric Setting.

    PubMed

    Hardie, Rae-Anne; Baysari, Melissa T; Lake, Rebecca; Richardson, Lauren; McCullagh, Cheryl; Westbrook, Johanna I

    2017-01-01

    The roll-out of a hospital-wide electronic medication management system (eMMS) is a challenging task, requiring planning, coordination, communication and change management. This research aimed to explore the views of doctors and nurses about the strategy used to implement an eMM system in a paediatric hospital. Semi-structured interviews were performed during the first week of the implementation on each ward, and were then followed up three and six weeks post implementation. In total, 90 users (60 nurses and 30 doctors) were asked about their impressions of the implementation, as well as their perceptions of training and IT support. Qualitative thematic analysis was performed by three researchers. Most users perceived the implementation of the eMM to be positive overall. Although perceptions of the implementation process remained largely consistent across the six weeks, users identified several areas where improvements were needed, especially early in implementation, including resources, planning, roll-out strategy and training. These findings are useful for future implementations of eMM systems in paediatric hospitals.

  11. Application of computer-aided dispatch in law enforcement: An introductory planning guide

    NASA Technical Reports Server (NTRS)

    Sohn, R. L.; Gurfield, R. M.; Garcia, E. A.; Fielding, J. E.

    1975-01-01

    A set of planning guidelines for the application of computer-aided dispatching (CAD) to law enforcement is presented. Some essential characteristics and applications of CAD are outlined; the results of a survey of systems in the operational or planning phases are summarized. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Detailed descriptions of typical law enforcement CAD systems, and a list of vendor sources, are given in appendixes.

  12. Implementing Health Policy: Lessons from the Scottish Well Men's Policy Initiative.

    PubMed

    Douglas, Flora; van Teijlingen, Edwin; Smith, Cairns; Moffat, Mandy

    2015-01-01

    Little is known about how health professionals translate national government health policy directives into action. This paper examines that process using the so-called Well Men's Services (WMS) policy initiative as a 'real world' case study. The WMS were launched by the Scottish Government to address men's health inequalities. Our analysis aimed to develop a deeper understanding of policy implementation as it naturally occurred, used an analytical framework that was developed to reflect the 'rational planning' principles health professionals are commonly encouraged to use for implementation purposes. A mixed-methods qualitative enquiry using a data archive generated during the WMS policy evaluation was used to critically analyze (post hoc) the perspectives of national policy makers, and local health and social care professionals about the: (a) 'policy problem', (b) interventions intended to address the problem, and (c) anticipated policy outcomes. This analysis revealed four key themes: (1) ambiguity regarding the policy problem and means of intervention; (2) behavioral framing of the policy problem and intervention; (3) uncertainty about the policy evidence base and outcomes, and; (4) a focus on intervention as outcome . This study found that mechanistic planning heuristics (as a means of supporting implementation) fails to grapple with the indeterminate nature of population health problems. A new approach to planning and implementing public health interventions is required that recognises the complex and political nature of health problems; the inevitability of imperfect and contested evidence regarding intervention, and, future associated uncertainties.

  13. 17 CFR 242.608 - Filing and amendment of national market system plans.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... national market subsystem or facility contemplated by a national market system plan; (ii) Preparing and... date of completion of each phase; (C) An analysis of the impact on competition of implementation of the..., operation, or regulation of a national market system (or a subsystem thereof) or one or more facilities...

  14. 17 CFR 242.608 - Filing and amendment of national market system plans.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... national market subsystem or facility contemplated by a national market system plan; (ii) Preparing and... date of completion of each phase; (C) An analysis of the impact on competition of implementation of the..., operation, or regulation of a national market system (or a subsystem thereof) or one or more facilities...

  15. 17 CFR 242.608 - Filing and amendment of national market system plans.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... national market subsystem or facility contemplated by a national market system plan; (ii) Preparing and... date of completion of each phase; (C) An analysis of the impact on competition of implementation of the..., operation, or regulation of a national market system (or a subsystem thereof) or one or more facilities...

  16. 17 CFR 242.608 - Filing and amendment of national market system plans.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... national market subsystem or facility contemplated by a national market system plan; (ii) Preparing and... date of completion of each phase; (C) An analysis of the impact on competition of implementation of the..., operation, or regulation of a national market system (or a subsystem thereof) or one or more facilities...

  17. 17 CFR 242.608 - Filing and amendment of national market system plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... national market subsystem or facility contemplated by a national market system plan; (ii) Preparing and... date of completion of each phase; (C) An analysis of the impact on competition of implementation of the..., operation, or regulation of a national market system (or a subsystem thereof) or one or more facilities...

  18. A Computer Simulation Modeling Tool to Assist Colleges in Long-Range Planning. Final Report.

    ERIC Educational Resources Information Center

    Salmon, Richard; And Others

    Long-range planning involves the establishment of educational objectives within a rational philosophy, the design of activities and programs to meet stated objectives, the organization and allocation of resources to implement programs, and the analysis of results in terms of the objectives. Current trends of educational growth and complexity…

  19. Planning for robust reserve networks using uncertainty analysis

    USGS Publications Warehouse

    Moilanen, A.; Runge, M.C.; Elith, Jane; Tyre, A.; Carmel, Y.; Fegraus, E.; Wintle, B.A.; Burgman, M.; Ben-Haim, Y.

    2006-01-01

    Planning land-use for biodiversity conservation frequently involves computer-assisted reserve selection algorithms. Typically such algorithms operate on matrices of species presence?absence in sites, or on species-specific distributions of model predicted probabilities of occurrence in grid cells. There are practically always errors in input data?erroneous species presence?absence data, structural and parametric uncertainty in predictive habitat models, and lack of correspondence between temporal presence and long-run persistence. Despite these uncertainties, typical reserve selection methods proceed as if there is no uncertainty in the data or models. Having two conservation options of apparently equal biological value, one would prefer the option whose value is relatively insensitive to errors in planning inputs. In this work we show how uncertainty analysis for reserve planning can be implemented within a framework of information-gap decision theory, generating reserve designs that are robust to uncertainty. Consideration of uncertainty involves modifications to the typical objective functions used in reserve selection. Search for robust-optimal reserve structures can still be implemented via typical reserve selection optimization techniques, including stepwise heuristics, integer-programming and stochastic global search.

  20. [Design of a HACCP Plan for the Gouda-type cheesemaking process in a milk processing plant].

    PubMed

    Dávila, Jacqueline; Reyes, Genara; Corzo, Otoniel

    2006-03-01

    The Hazard Analysis and Critical Control Point (HACCP) is a preventive and systematic method used to identify, assess and control of the hazards related with raw material, ingredients, processing, marketing and intended consumer in order to assure the safety of the food. The aim of this study was to design a HACCP plan for implementing in a Gouda-type cheese-making process in a dairy processing plant. The used methodology was based in the application of the seven principles of the HACCP, the information from the plant about the compliment of the pre-requisite programs (70-80%), the experience of the HACCP team and the sequence of stages settles down by the COVENIN standard 3802 for implementing the HACCP system. A HACCP plan was proposed with the scope, the selection of HACCP team, the description of the product and the intended use, the flow diagram of the process, the hazard analysis and the control table of the plan with the critical control points (CCP). The following CCP were identified in the process: pasteurization, coagulation and ripening.

  1. Community-based assessment and planning of energy futures

    NASA Astrophysics Data System (ADS)

    Carnes, S. A.

    1981-04-01

    The decentralized solar energy technology assessment program is discussed. Four communities were involved in an assessment of the compatibility of diverse conservation and renewable energy supply technologies and community values and goals and in community planning for the implementation of compatible energy demand and supply alternatives. The community approach has several basic components: (1) recruiting and organizing for the assessment planning process; (2) collection and analysis of data related to community energy use and indigenous renewable energy resources; (3) creation and maintenance of a community education and information program; (4) development of policies favorable to the development of preferred community futures; and (5) development of implementation or action strategies. The role of public participation, group decision making techniques, the role of technical information in citizen and group decision making, and linkage between assessment planning and the relevant policy process are emphasized.

  2. IMPlementation of A Relatives' Toolkit (IMPART study): an iterative case study to identify key factors impacting on the implementation of a web-based supported self-management intervention for relatives of people with psychosis or bipolar experiences in a National Health Service: a study protocol.

    PubMed

    Lobban, Fiona; Appleton, Victoria; Appelbe, Duncan; Barraclough, Johanna; Bowland, Julie; Fisher, Naomi R; Foster, Sheena; Johnson, Sonia; Lewis, Elizabeth; Mateus, Céu; Mezes, Barbara; Murray, Elizabeth; O'Hanlon, Puffin; Pinfold, Vanessa; Rycroft-Malone, Jo; Siddle, Ron; Smith, Jo; Sutton, Chris J; Walker, Andrew; Jones, Steven H

    2017-12-28

    Web-based interventions to support people to manage long-term health conditions are available and effective but rarely used in clinical services. The aim of this study is to identify critical factors impacting on the implementation of an online supported self-management intervention for relatives of people with recent onset psychosis or bipolar disorder into routine clinical care and to use this information to inform an implementation plan to facilitate widespread use and inform wider implementation of digital health interventions. A multiple case study design within six early intervention in psychosis (EIP) services in England, will be used to test and refine theory-driven hypotheses about factors impacting on implementation of the Relatives' Education And Coping Toolkit (REACT). Qualitative data including behavioural observation, document analysis, and in-depth interviews collected in the first two EIP services (wave 1) and analysed using framework analysis, combined with quantitative data describing levels of use by staff and relatives and impact on relatives' distress and wellbeing, will be used to identify factors impacting on implementation. Consultation via stakeholder workshops with staff and relatives and co-facilitated by relatives in the research team will inform development of an implementation plan to address these factors, which will be evaluated and refined in the four subsequent EIP services in waves 2 and 3. Transferability of the implementation plan to non-participating services will be explored. Observation of implementation in a real world clinical setting, across carefully sampled services, in real time provides a unique opportunity to understand factors impacting on implementation likely to be generalizable to other web-based interventions, as well as informing further development of implementation theories. However, there are inherent challenges in investigating implementation without influencing the process under observation. We outline our strategies to ensure our design is transparent, flexible, and responsive to the timescales and activities happening within each service whilst also meeting the aims of the project. ISCTRN 16267685 (09/03/2016).

  3. 77 FR 5191 - Approval and Promulgation of Air Quality Implementation Plans; District of Columbia; Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-02

    ... Promulgation of Air Quality Implementation Plans; District of Columbia; Regional Haze State Implementation Plan... of Columbia Regional Haze Plan, a revision to the District of Columbia State Implementation Plan (SIP... existing anthropogenic impairment of visibility in mandatory Class I areas through a regional haze program...

  4. [Integration of the radiotherapy irradiation planning in the digital workflow].

    PubMed

    Röhner, F; Schmucker, M; Henne, K; Momm, F; Bruggmoser, G; Grosu, A-L; Frommhold, H; Heinemann, F E

    2013-02-01

    At the Clinic of Radiotherapy at the University Hospital Freiburg, all relevant workflow is paperless. After implementing the Operating Schedule System (OSS) as a framework, all processes are being implemented into the departmental system MOSAIQ. Designing a digital workflow for radiotherapy irradiation planning is a large challenge, it requires interdisciplinary expertise and therefore the interfaces between the professions also have to be interdisciplinary. For every single step of radiotherapy irradiation planning, distinct responsibilities have to be defined and documented. All aspects of digital storage, backup and long-term availability of data were considered and have already been realized during the OSS project. After an analysis of the complete workflow and the statutory requirements, a detailed project plan was designed. In an interdisciplinary workgroup, problems were discussed and a detailed flowchart was developed. The new functionalities were implemented in a testing environment by the Clinical and Administrative IT Department (CAI). After extensive tests they were integrated into the new modular department system. The Clinic of Radiotherapy succeeded in realizing a completely digital workflow for radiotherapy irradiation planning. During the testing phase, our digital workflow was examined and afterwards was approved by the responsible authority.

  5. Development and Implementation of South Asia’s First Heat-Health Action Plan in Ahmedabad (Gujarat, India)

    PubMed Central

    Knowlton, Kim; Kulkarni, Suhas P.; Azhar, Gulrez Shah; Mavalankar, Dileep; Jaiswal, Anjali; Connolly, Meredith; Nori-Sarma, Amruta; Rajiva, Ajit; Dutta, Priya; Deol, Bhaskar; Sanchez, Lauren; Khosla, Radhika; Webster, Peter J.; Toma, Violeta E.; Sheffield, Perry; Hess, Jeremy J.

    2014-01-01

    Recurrent heat waves, already a concern in rapidly growing and urbanizing South Asia, will very likely worsen in a warming world. Coordinated adaptation efforts can reduce heat’s adverse health impacts, however. To address this concern in Ahmedabad (Gujarat, India), a coalition has been formed to develop an evidence-based heat preparedness plan and early warning system. This paper describes the group and initial steps in the plan’s development and implementation. Evidence accumulation included extensive literature review, analysis of local temperature and mortality data, surveys with heat-vulnerable populations, focus groups with health care professionals, and expert consultation. The findings and recommendations were encapsulated in policy briefs for key government agencies, health care professionals, outdoor workers, and slum communities, and synthesized in the heat preparedness plan. A 7-day probabilistic weather forecast was also developed and is used to trigger the plan in advance of dangerous heat waves. The pilot plan was implemented in 2013, and public outreach was done through training workshops, hoardings/billboards, pamphlets, and print advertisements. Evaluation activities and continuous improvement efforts are ongoing, along with plans to explore the program’s scalability to other Indian cities, as Ahmedabad is the first South Asian city to address heat-health threats comprehensively. PMID:24670386

  6. 76 FR 43175 - Approval of Air Quality Implementation Plans; Indiana and Ohio; Disapproval of Interstate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... impact. EPA stated that the state's conclusion should be supported by an adequate technical analysis. EPA... by an adequate technical analysis. IDEM did not provide a technical analysis in its submittal, but... technical analysis and justification necessary to make that demonstration. Indiana did not provide any...

  7. 75 FR 64221 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-19

    ... combination of combustion and post-combustion controls. EPA approached the five factor analysis using a top... from fuel-bound nitrogen and high temperature combustion; (2) post- combustion add-on control to reduce... is a combination of a post- combustion add-on control, i.e., selective catalytic reduction (SCR), and...

  8. Enhancing E-Learning Quality through the Application of the AKUE Procedure Model

    ERIC Educational Resources Information Center

    Bremer, C.

    2012-01-01

    The paper describes the procedure model AKUE, which aims at the improvement and assurance of quality and cost efficiency in the context of the introduction of e-learning and the development of digital learning material. AKUE divides the whole planning and implementation process into four different phases: analysis, conception, implementation, and…

  9. Multi-Agency Radiological Laboratory Analytical Protocols Manual (MARLAP)

    EPA Pesticide Factsheets

    The Multi-Agency Radiological Laboratory Analytical Protocols Manual (MARLAP) provides guidance for the planning, implementation and assessment phases of projects that require laboratory analysis of radionuclides.

  10. 76 FR 43136 - Approval and Promulgation of Air Quality Implementation Plan; Kentucky; Disapproval of Interstate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... supported by an adequate technical analysis. Second, EPA recommended the various types of information that... technical analysis, including, but not limited to, information concerning emissions in the state...: ``* * * without an adequate technical analysis EPA does not believe that states can sufficiently address the...

  11. 76 FR 2853 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... technical analysis submitted for parallel-processing by DNREC on December 9, 2010, to address significant... technical analysis submitted by DNREC for parallel-processing on December 9, 2010, to satisfy the... consists of a technical analysis that provides detailed support for Delaware's position that it has...

  12. State landscape in public health planning and quality improvement: results of the ASTHO survey.

    PubMed

    Madamala, Kusuma; Sellers, Katie; Pearsol, Jim; Dickey, Michael; Jarris, Paul E

    2010-01-01

    Limited data exist on state public health agencies and their use of planning and quality improvement (QI) initiatives. Using the 2007 Association of State and Territorial Health Officials (ASTHO) State Public Health Survey, this article describes how state public health agencies perform tasks related to planning, performance management (PM), and QI. While 82 percent of respondents report having a QI process in place, only 9.8 percent have it fully implemented departmentwide. Seventy-six percent reported having a PM process in place, with 16 percent (n = 8) having it fully implemented departmentwide. A state health improvement plan was used by 80.4 percent of respondents, with 56.9 percent of respondents completing the plan more than 3 years ago. More than two-thirds (68.2%) of the respondents developed the plan by using results of their state health assessment. Analysis of state health department level planning, PM, and QI initiatives can inform states' efforts to ready themselves to meet the proposed national voluntary accreditation standards of the Public Health Accreditation Board.

  13. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Implementation plan. 598.605 Section 598.605 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an...

  14. 77 FR 41279 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State Implementation Plan AGENCY... the Regional Haze State Implementation Plan (SIP) (hereafter RH SIP) revision submitted by the... anthropogenic impairment of visibility in mandatory Class I areas [[Page 41280

  15. 76 FR 12945 - Instructions for Implementing Climate Change Adaptation Planning in Accordance With Executive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... COUNCIL ON ENVIRONMENTAL QUALITY Instructions for Implementing Climate Change Adaptation Planning... Availability of Climate Change Adaptation Planning Implementing Instructions. SUMMARY: The Chair of the Council... for Implementing Climate Change Adaptation Planning are now available at: http://www.whitehouse.gov...

  16. Implementation of a best management practice (BMP) system for a clay mining facility in Taiwan.

    PubMed

    Lin, Jen-Yang; Chen, Yen-Chang; Chen, Walter; Lee, Tsu-Chuan; Yu, Shaw L

    2006-01-01

    The present paper describes the planning and implementation of a best management practice (BMP) system for a clay mining facility in Northern Taiwan. It is a challenge to plan and design BMPs for mitigating the impact of clay mining operations due to the fact that clay mining drainage typically contains very high concentrations of suspended solids (SS), Fe-ions, and [H+] concentrations. In the present study, a field monitoring effort was conducted to collect data for runoff quality and quantity from a clay mining area in Northern Taiwan. A BMP system including holding ponds connected in series was designed and implemented and its pollutant removal performance was assessed. The assessment was based on mass balance computations and an analysis of the relationship between BMP design parameters such as pond depth, detention time, surface loading rate, etc. and the pollutant removal efficiency. Field sampling results showed that the surface-loading rate is exponential related to the removing rate. The results provide the basis for a more comprehensive and efficient BMP implementation plan for clay mining operations.

  17. Poster - Thur Eve - 54: A software solution for ongoing DVH quality assurance in radiation therapy.

    PubMed

    Annis, S-L; Zeng, G; Wu, X; Macpherson, M

    2012-07-01

    A program has been developed in MATLAB for use in quality assurance of treatment planning of radiation therapy. It analyzes patient DVH files and compiles dose volume data for review, trending, comparison and analysis. Patient DVH files are exported from the Eclipse treatment planning system and saved according to treatment sites and date. Currently analysis is available for 4 treatment sites; Prostate, Prostate Bed, Lung, and Upper GI, with two functions for data report and analysis: patient-specific and organ-specific. The patient-specific function loads one patient DVH file and reports the user-specified dose volume data of organs and targets. These data can be compiled to an external file for a third party analysis. The organ-specific function extracts a requested dose volume of an organ from the DVH files of a patient group and reports the statistics over this population. A graphical user interface is utilized to select clinical sites, function and structures, and input user's requests. We have implemented this program in planning quality assurance at our center. The program has tracked the dosimetric improvement in GU sites after VMAT was implemented clinically. It has generated dose volume statistics for different groups of patients associated with technique or time range. This program allows reporting and statistical analysis of DVH files. It is an efficient tool for the planning quality control in radiation therapy. © 2012 American Association of Physicists in Medicine.

  18. Protecting drinkable water: an analysis of action plans and stakeholders' networks

    NASA Astrophysics Data System (ADS)

    Gascuel-Odoux, Chantal; Menard, Marjorie

    2015-04-01

    Since WFD the policy for protecting drinkable water has been enhanced in France. This policy establish the main components and the different steps for protecting drinkable water, and ask for defining and implementing an action plan for each contributing catchment. Despite ambitious objectives, the local implementation is difficult. Firstly there is a high diversity of stakeholders involved with local authorities, which are mainly: water agencies, agricultural chambers and consultants, authorities at regional and departmental levels. Most of the local authorities do not feel qualified enough for carrying out such a policy, as they are not really used to deal with technical and political issues related to agricultural diffuse pollutions. As a consequence assessed action plans are based on regulation and/or agri-environmental measures. More ambitious and complementary measures can be included, but without any support measure nor accurate objectives for their implementation. In the end, action plans reflect more a formal implementation of protection approaches than a search for efficiency by defining ambitious measures and the setting-up a consistent support scheme. The way stakeholders' networks mobilize knowledge have been analyzed based on ten case studies located in three different regions. Three local authorities profiles are defined: (1) the "passive" ones, not really convinced of the necessity to undertake actions against diffuse pollutions and/or having low level of knowledge to support local reflexion, that delegate project management; (2) the local authorities that support local protection approach but that, for different reasons, do not search for an effective action plan, and that only consider an improvement approach; (3) the local authorities that more rarely, aim at efficient actions, motivated by the urgent need of action for preserving threatened resources. According to these profiles, local authorities and their project coordinators will be looking for, more or less actively, mobilizing stakeholders' networks and knowledge that enable to build a strategic management. Reciprocally, institutional stakeholders push for more formal or demanding approaches, with most of the time low level of knowledge that could objectivize the relevance of action plans. This analysis contributes to help some key stakeholders, particularly local authorities, in building more efficient action plans.

  19. 78 FR 40966 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Interstate Transport...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ...'s technical analysis addressing the requirements of CAA section 110(a)(2)(D)(i) for the 2006 PM 2.5 NAAQS, with EPA's additional analysis and technical information, we approve the portion of the June 12...

  20. How Schools Can Effectively Plan to Meet the Goal of Improving Student Learning

    ERIC Educational Resources Information Center

    Grumdahl, Constance Rae

    2010-01-01

    Purpose. The purpose of the study was to identify the impact on achievement when schools implement a continuous improvement model using Total Quality Management (TQM) principles aligned to strategic planning and the culture of the school. Data collection and analysis. The study combined qualitative and quantitative methods and was conducted in two…

  1. 78 FR 54835 - Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... input options commensurate with the Regulatory Modeling Guidance. Perform current and post control.... Table 2--Post-Control Modeling Results \\4\\ Sanders lead facility Max 3-mth Background Total Year maximum...\\ (Facility MET data). The post-control analysis resulted in a predicted impact of 0.15 [mu]g/m\\3\\ (NWS MET...

  2. Social Media as a Practical Approach in Engaging Key Stakeholders in School Crisis Communication Plans: A Qualitative Analysis

    ERIC Educational Resources Information Center

    Agozzino, Alisa; Kaiser, Candace

    2014-01-01

    The current study examined how public relations specialists within school systems are developing, implementing, and revising their communication crisis plans in an effort to fully engage all key stakeholders. Four research questions and two hypotheses were posed. Members from a state public relations association for schools were asked to…

  3. Improving Teacher Candidates' Lesson Planning Competencies through Peer Review in a Wiki Environment

    ERIC Educational Resources Information Center

    Salajan, Florin D.; Nyachwaya, James M.; Hoffman, Jeanette G.; Hill, Brent D.

    2016-01-01

    This article examines the implementation of a wiki-type platform for lesson planning for teacher candidates in an undergraduate general instructional methods course in the teacher education program of a Midwestern university in the United States. The study draws on the results of two separate sets of analysis involving 159 participants. Teacher…

  4. Personal Development Planning: Pedagogy and the Politicisation of the Personal

    ERIC Educational Resources Information Center

    Tymms, Mark; Peters, John; Scott, Ian

    2013-01-01

    This article reflects the findings of an initial investigation of the origins of Personal Development Planning (PDP) and is part of a wider study of the impacts and influences of the implementation. Through an analysis of the socio-political contexts within which PDP as a set of educational processes took form, together with the many theories and…

  5. 40 CFR 52.672 - Approval of plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Idaho § 52.672 Approval of plans. (a) Carbon Monoxide. (1) EPA approves as a revision to the Idaho State Implementation Plan, the Limited Maintenance Plan for.... [Reserved] (e) Particulate Matter. (1) EPA approves as a revision to the Idaho State Implementation Plan...

  6. 78 FR 17835 - Approval and Promulgation of Federal Implementation Plan for Oil and Natural Gas Well Production...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ...The EPA is taking final action to promulgate a Reservation- specific Federal Implementation Plan in order to regulate emissions from oil and natural gas production facilities located on the Fort Berthold Indian Reservation in North Dakota. The Federal Implementation Plan includes basic air quality regulations for the protection of communities in and adjacent to the Fort Berthold Indian Reservation. The Federal Implementation Plan requires owners and operators of oil and natural gas production facilities to reduce emissions of volatile organic compounds emanating from well completions, recompletions, and production and storage operations. This Federal Implementation Plan will be implemented by the EPA, or a delegated tribal authority, until replaced by a Tribal Implementation Plan. The EPA proposed a Reservation-specific Federal Implementation Plan concurrently with an interim final rule on August 15, 2012. This final Federal Implementation Plan replaces the interim final rule in all intents and purposes on the effective date of the final rule. The EPA is taking this action pursuant to the Clean Air Act (CAA).

  7. Disability Policy Implementation From a Cross-Cultural Perspective.

    PubMed

    Verdugo, Miguel A; Jenaro, Cristina; Calvo, Isabel; Navas, Patricia

    2017-07-01

    Implementation of disability policy is influenced by social, political, and cultural factors. Based on published work, this article discusses four guidelines considered critical for successful policy implementation from a cross-cultural perspective. These guidelines are to: (a) base policy implementation on a contextual analysis, (b) employ a value-based approach, (c) align the service delivery system both vertically and horizontally, and (d) engage in a partnership in policy implementation. Public policy should be understood from a systems perspective that includes cross-cultural issues, such as how different stakeholders are acting and the way they plan and implement policy.

  8. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Implementation plan. 598.605 Section 598.605 Housing and Urban Development Regulations Relating to Housing and Urban Development... Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an...

  9. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Implementation plan. 598.605 Section 598.605 Housing and Urban Development Regulations Relating to Housing and Urban Development... Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an...

  10. 78 FR 68005 - Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-13

    ... this Federal Register, EPA is approving the State's implementation plan revision as a direct final rule...] Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP--Memorandum... proposing to approve a State Implementation Plan revision submitted by the Mississippi Department of...

  11. Effective protection of open space: does planning matter?

    PubMed

    Steelman, Toddi A; Hess, George R

    2009-07-01

    High quality plans are considered a crucial part of good land use planning and often used as a proxy measure for success in plan implementation and goal attainment. We explored the relationship of open space plan quality to the implementation of open space plans and attainment of open space protection goals in Research Triangle, North Carolina, USA. To measure plan quality, we used a standard plan evaluation matrix that we modified to focus on open space plans. We evaluated all open space plans in the region that contained a natural resource protection element. To measure plan implementation and open space protection, we developed an online survey and administered it to open space planners charged with implementing the plans. The survey elicited each planner's perspective on aspects of open space protection in his or her organization. The empirical results (1) indicate that success in implementation and attaining goals are not related to plan quality, (2) highlight the importance of when and how stakeholders are involved in planning and implementation processes, and (3) raise questions about the relationship of planning to implementation. These results suggest that a technically excellent plan does not guarantee the long-term relationships among local land owners, political and appointed officials, and other organizations that are crucial to meeting land protection goals. A greater balance of attention to the entire decision process and building relationships might lead to more success in protecting open space.

  12. Supporting local planning and budgeting for maternal, neonatal and child health in the Philippines

    PubMed Central

    2013-01-01

    Background Responsibility for planning and delivery of health services in the Philippines is devolved to the local government level. Given the recognised need to strengthen capacity for local planning and budgeting, we implemented Investment Cases (IC) for Maternal, Neonatal and Child Health (MNCH) in three selected sub-national units: two poor, rural provinces and one highly-urbanised city. The IC combines structured problem-solving by local policymakers and planners to identify key health system constraints and strategies to scale-up critical MNCH interventions with a decision-support model to estimate the cost and impact of different scaling-up scenarios. Methods We outline how the initiative was implemented, the aspects that worked well, and the key limitations identified in the sub-national application of this approach. Results Local officials found the structured analysis of health system constraints helpful to identify problems and select locally appropriate strategies. In particular the process was an improvement on standard approaches that focused only on supply-side issues. However, the lack of data available at the local level is a major impediment to planning. While the majority of the strategies recommended by the IC were incorporated into the 2011 plans and budgets in the three study sites, one key strategy in the participating city was subsequently reversed in 2012. Higher level systemic issues are likely to have influenced use of evidence in plans and budgets and implementation of strategies. Conclusions Efforts should be made to improve locally-representative data through routine information systems for planning and monitoring purposes. Even with sound plans and budgets, evidence is only one factor influencing investments in health. Political considerations at a local level and issues related to decentralisation, influence prioritisation and implementation of plans. In addition to the strengthening of capacity at local level, a parallel process at a higher level of government to relieve fund channelling and coordination issues is critical for any evidence-based planning approach to have a significant impact on health service delivery. PMID:23343218

  13. 78 FR 41731 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four Corners Power... Implementation Plan (FIP) to implement the Best Available Retrofit Technology (BART) requirement of the Regional... given the uncertainties in the electrical market in Arizona, EPA is proposing to extend the date by...

  14. Signal analysis techniques for incipient failure detection in turbomachinery

    NASA Technical Reports Server (NTRS)

    Coffin, T.

    1985-01-01

    Signal analysis techniques for the detection and classification of incipient mechanical failures in turbomachinery were developed, implemented and evaluated. Signal analysis techniques available to describe dynamic measurement characteristics are reviewed. Time domain and spectral methods are described, and statistical classification in terms of moments is discussed. Several of these waveform analysis techniques were implemented on a computer and applied to dynamic signals. A laboratory evaluation of the methods with respect to signal detection capability is described. Plans for further technique evaluation and data base development to characterize turbopump incipient failure modes from Space Shuttle main engine (SSME) hot firing measurements are outlined.

  15. 78 FR 40654 - Approval, Disapproval and Promulgation of Implementation Plans; State of Wyoming; Regional Haze...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-08

    ..., Disapproval and Promulgation of Implementation Plans; State of Wyoming; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze; Notice of Public Hearings AGENCY: Environmental...) addressing regional haze under. We are making this change in response to letters submitted by the Governor of...

  16. 78 FR 78310 - Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... Federal Register, EPA is approving the State's implementation plan revision as a direct final rule without...] Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity Memorandum of... Implementation Plan submitted on July 12, 2013, through the North Carolina Department of Environment and Natural...

  17. 77 FR 58072 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... Substantial Inadequacy of Implementation Plan; Call for California State Implementation Plan Revision; South Coast AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: In response to a... that the California State Implementation Plan (SIP) for the Los Angeles-South Coast Air Basin (South...

  18. 78 FR 30770 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards Revision AGENCY... Illinois state implementation plan (SIP) to reflect current National Ambient Air Quality Standards (NAAQS... Implementation Plan at 35 Illinois Administrative Code part 243, which updates National Ambient Air Quality...

  19. Building hospital capacity planning mechanisms in Poland: The impact of 2016/2017 regulatory changes.

    PubMed

    Dubas-Jakóbczyk, Katarzyna; Sowada, Christoph; Domagała, Alicja; Więckowska, Barbara

    2018-02-07

    Capacity planning is a crucial component of modern health care governance. The aim of this paper is to analyze the requirements that need to be met to build effective hospital capacity planning mechanisms in Poland. In this context, the recent regulatory changes strongly influencing hospital sector functioning, including introduction of health care needs maps, capital investment assessment, and hospital network regulations, are analyzed. Some possible ways forward, based on review of international experiences in hospital capacity planning, are discussed. Applied methods include literature review and analysis of statistical data as well as desk analysis of key national regulations related to hospital sector. Results indicate that at the system level, the process of capacity planning involves 4 elements: capital investment in facilities, equipment, and technology; service delivery; allocation of staff; and financial resources. For hospital capacity planning to be effective, the strategic decision at the macrolevel must be complemented by appropriate management of individual hospitals. The major challenge of building hospital capacity planning mechanism in Poland is imbedding it into the overall health system strategy. Because of the lack of such a strategy, the practical implementation of the ad hoc changes, which have been introduced, shows some inconsistencies. The regulations implemented between 2016 and 2017 provided a basis for hospital capacity planning, yet still need evaluation and adjustments. Also, including a mechanism for human resources planning is of crucial importance. The regulations should provide incentives for reducing oversized hospital infrastructure with simultaneous development of the long-term and coordinated care models. Copyright © 2018 John Wiley & Sons, Ltd.

  20. [Evaluation of land resources carrying capacity of development zone based on planning environment impact assessment].

    PubMed

    Fu, Shi-Feng; Zhang, Ping; Jiang, Jin-Long

    2012-02-01

    Assessment of land resources carrying capacity is the key point of planning environment impact assessment and the main foundation to determine whether the planning could be implemented or not. With the help of the space analysis function of Geographic Information System, and selecting altitude, slope, land use type, distance from resident land, distance from main traffic roads, and distance from environmentally sensitive area as the sensitive factors, a comprehensive assessment on the ecological sensitivity and its spatial distribution in Zhangzhou Merchants Economic and Technological Development Zone, Fujian Province of East China was conducted, and the assessment results were combined with the planning land layout diagram for the ecological suitability analysis. In the Development Zone, 84.0% of resident land, 93.1% of industrial land, 86.0% of traffic land, and 76. 0% of other constructive lands in planning were located in insensitive and gently sensitive areas, and thus, the implement of the land use planning generally had little impact on the ecological environment, and the land resources in the planning area was able to meet the land use demand. The assessment of the population carrying capacity with ecological land as the limiting factor indicated that in considering the highly sensitive area and 60% of the moderately sensitive area as ecological land, the population within the Zone in the planning could reach 240000, and the available land area per capita could be 134.0 m2. Such a planned population scale is appropriate, according to the related standards of constructive land.

  1. Productivity Measurement and Analysis of Airborne Weapons Maintenance Plans Performed by the Weapons Support Directorate, Pacific Missile Test Center, Pt. Mugu.

    DTIC Science & Technology

    1987-12-01

    FM__KWJW~j’JVx W-V WWv Wu M WV b7’ II. LIT’rIEK REVI, AND TD .ORZTICAL F MW A. WHAT IS PRODUCTIVITY? 1. Productivity Definod The definition of...Implementing the Manpower Budget And Workgd Forecasting System The implementation of the system designed in Step 9. Step 12 - Implement ihQ inaAn MtpQx

  2. A Comparative Analysis of Education Policy and Practice: The Case of Institutions in Mumbai and Delhi

    ERIC Educational Resources Information Center

    Iyengar, Radhika; Surianarain, Sharmi

    2010-01-01

    There exist many actors within the realm of education policy planning and implementation, namely: the policy makers; the national, local and regional institutions engaged in the dissemination and interpretation of these policies; and the educational institutions that implement these policies at the ground level (schools). While schools are largely…

  3. Exam Preparation: The Influence of Action Control, Procrastination and Examination Experience on Students' Goal Intention and Implementation Intention

    ERIC Educational Resources Information Center

    Sommer, Lutz

    2013-01-01

    Introduction: In the framework of the intention-behavior-gap analysis in relation to exam preparation I examined whether intention--subdivided into goal and implementation intention--is influenced directly by the determinants action control, procrastination and examination experience which is consistent with the Theory of Planned Behavior and…

  4. Implementation of the Biosphere Compatibility Principle in Urban Planning: How to Train Next-Generation Specialists

    ERIC Educational Resources Information Center

    Ivanova, Zinaida Ilyinichna; Yudenkova, Olga Valeryevna; Ishkov, Aleksandr Dmitrievich; Shnyrenkov, Evgeny Anatolyevich

    2015-01-01

    The co-authors address the relevant issues concerning the need to implement the principle of the biosphere compatibility as the core prerequisite for the symbiotic co-existence of man and nature. Caring treatment of the biosphere, termination of its excessive exploitation, analysis of the ratio between the biospheric potential of specific areas…

  5. Proceedings of Annual Acquisition Research Symposium (7th), Hershey, Pennsylvania, 31 May-2 Jun 1978

    DTIC Science & Technology

    1978-06-01

    strongly, with DCS/Plans our efforts going during difficult periods, and Operation leadership and heavy MAJCOM but mission area planning and analysis is...implementing DOD required with heavy participation by AFSC. Directives 5000.1 and 5000.2 require new pro- Zero-Base Budgeting is the third part of the...Mission Area Analysis portion, it it -omposed of three logical steps. The fir-t .?p de - velops viable alternatives for tae -.. R&D programs. The second

  6. Remediation plans in family medicine residency

    PubMed Central

    Audétat, Marie-Claude; Voirol, Christian; Béland, Normand; Fernandez, Nicolas; Sanche, Gilbert

    2015-01-01

    Abstract Objective To assess use of the remediation instrument that has been implemented in training sites at the University of Montreal in Quebec to support faculty in diagnosing and remediating resident academic difficulties, to examine whether and how this particular remediation instrument improves the remediation process, and to determine its effects on the residents’ subsequent rotation assessments. Design A multimethods approach in which data were collected from different sources: remediation plans developed by faculty, program statistics for the corresponding academic years, and students’ academic records and rotation assessment results. Setting Family medicine residency program at the University of Montreal. Participants Family medicine residents in academic difficulty. Main outcome measures Assessment of the content, process, and quality of remediation plans, and students’ academic and rotation assessment results (successful, below expectations, or failure) both before and after the remediation period. Results The framework that was developed for assessing remediation plans was used to analyze 23 plans produced by 10 teaching sites for 21 residents. All plans documented cognitive problems and implemented numerous remediation measures. Although only 48% of the plans were of good quality, implementation of a remediation plan was positively associated with the resident’s success in rotations following the remediation period. Conclusion The use of remediation plans is well embedded in training sites at the University of Montreal. The residents’ difficulties were mainly cognitive in nature, but this generally related to deficits in clinical reasoning rather than knowledge gaps. The reflection and analysis required to produce a remediation plan helps to correct many academic difficulties and normalize the academic career of most residents in difficulty. Further effort is still needed to improve the quality of plans and to support teachers.

  7. Multi-community command and control systems in law enforcement: An introductory planning guide

    NASA Technical Reports Server (NTRS)

    Sohn, R. L.; Garcia, E. A.; Kennedy, R. D.

    1976-01-01

    A set of planning guidelines for multi-community command and control systems in law enforcement is presented. Essential characteristics and applications of these systems are outlined. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Program management techniques and joint powers agreements for multicommunity programs are discussed in detail. A description of a typical multi-community computer-aided dispatch system is appended.

  8. The software analysis project for the Office of Human Resources

    NASA Technical Reports Server (NTRS)

    Tureman, Robert L., Jr.

    1994-01-01

    There were two major sections of the project for the Office of Human Resources (OHR). The first section was to conduct a planning study to analyze software use with the goal of recommending software purchases and determining whether the need exists for a file server. The second section was analysis and distribution planning for retirement planning computer program entitled VISION provided by NASA Headquarters. The software planning study was developed to help OHR analyze the current administrative desktop computing environment and make decisions regarding software acquisition and implementation. There were three major areas addressed by the study: current environment new software requirements, and strategies regarding the implementation of a server in the Office. To gather data on current environment, employees were surveyed and an inventory of computers were produced. The surveys were compiled and analyzed by the ASEE fellow with interpretation help by OHR staff. New software requirements represented a compilation and analysis of the surveyed requests of OHR personnel. Finally, the information on the use of a server represents research done by the ASEE fellow and analysis of survey data to determine software requirements for a server. This included selection of a methodology to estimate the number of copies of each software program required given current use and estimated growth. The report presents the results of the computing survey, a description of the current computing environment, recommenations for changes in the computing environment, current software needs, management advantages of using a server, and management considerations in the implementation of a server. In addition, detailed specifications were presented for the hardware and software recommendations to offer a complete picture to OHR management. The retirement planning computer program available to NASA employees will aid in long-range retirement planning. The intended audience is the NASA civil service employee with several years until retirement. The employee enters current salary and savings information as well as goals concerning salary at retirement, assumptions on inflation, and the return on investments. The program produces a picture of the employee's retirement income from all sources based on the assumptions entered. A session showing features of the program was conducted for key personnel at the Center. After analysis, it was decided to offer the program through the Learning Center starting in August 1994.

  9. 78 FR 45869 - Approval and Promulgation of State Implementation Plans; State of Montana; Interstate Transport...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... of Montana's submission because the submission did not include any technical analysis to support its..., EPA disagrees with that concern. Our technical analysis confirmed that emissions from Montana in total... irrelevant factors and lacks any technical analysis to support the State's conclusion with respect to...

  10. 76 FR 14835 - Approval and Promulgation of Air Quality Implementation Plan; Missouri; Proposed Disapproval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... the state's conclusion should be supported by an adequate technical analysis. EPA recommended the...)(2)(D)(i)(I) must be supported by an adequate technical analysis.\\5\\ EPA recommended the various..., the state did not further evaluate or demonstrate with a technical analysis that these measures...

  11. 76 FR 43167 - Approval and Promulgation of Air Quality Implementation Plan; North Carolina; Disapproval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... stated that the state's conclusion should be supported by an adequate technical analysis. Second, EPA... revision must be supported by an adequate technical analysis, including, but not limited to, information... disapproval where the Agency states: ``* * * without an adequate technical analysis EPA does not believe that...

  12. 76 FR 14831 - Approval and Promulgation of Air Quality Implementation Plan; Kansas; Proposed Disapproval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... State's conclusion should be supported by an adequate technical analysis. EPA recommended the various...) must be supported by an adequate technical analysis.\\5\\ EPA recommended the various types of... evaluate or demonstrate with a technical analysis that these measures address the requirements of 110(a)(2...

  13. 76 FR 43159 - Approval and Promulgation of Air Quality Implementation Plan; Georgia; Disapproval of Interstate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... stated that the state's conclusion should be supported by an adequate technical analysis. Second, EPA...'' provisions, the state's SIP revision must be supported by an adequate technical analysis, including, but not..., proposed disapproval where the Agency states: ``* * * without an adequate technical analysis EPA does not...

  14. 76 FR 53638 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-29

    ...), DNREC supplemented its September 16, 2009 submittal with a technical analysis submitted to EPA for... supplemental technical analysis, for which it has requested parallel-processing, through the public notice and... submitted the technical analysis to EPA as a formal supplement to its September 16, 2009 submittal. The...

  15. 76 FR 43128 - Approval and Promulgation of Air Quality Implementation Plan; Alabama; Disapproval of Interstate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ..., if so, address the impact. The state's conclusion must be supported by an adequate technical analysis...'' provisions, the state's SIP revision must be supported by an adequate technical analysis, including, but not... disapproval where the Agency states: ``* * *without an adequate technical analysis EPA does not believe that...

  16. 76 FR 4592 - Approval and Promulgation of Air Quality Implementation Plan; North Carolina; Disapproval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... adequate technical analysis. Second, EPA recommended the various types of information that could be... submission, it did not further evaluate or demonstrate with a technical analysis that this measure and their.... Unfortunately, without an adequate technical analysis EPA does not believe that states can sufficiently address...

  17. 78 FR 29314 - Approval and Promulgation of State Implementation Plans; State of Utah; Interstate Transport of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ...) SIP submissions an adequate technical analysis to support their conclusions regarding interstate... acceptable modeling technical analyses are available, but EPA does not believe that modeling is required if... regional scale technical analysis, and Utah will point to that analysis in order to conclude that there are...

  18. Experience measuring performance improvement in multiphase picture archiving and communications systems implementations.

    PubMed

    Reed, G; Reed, D H

    1999-05-01

    When planning a picture archiving and communications system (PACS) implementation and determining which equipment will be implemented in earlier and later phases, collection and analysis of selected data will aid in setting implementation priorities. If baseline data are acquired relative to performance objectives, the same information used for implementation planning can be used to measure performance improvement and outcomes. The main categories of data to choose from are: (1) financial data; (2) productivity data; (3) operational parameters; (4) clinical data; and (5) information about customer satisfaction. In the authors' experience, detailed workflow data have not proved valuable in measuring PACS performance and outcomes. Reviewing only one category of data in planning will not provide adequate basis for targeting operational improvements that will lead to the most significant gains. Quality improvement takes into account all factors in production: human capacity, materials, operating capital and assets. Once we have identified key areas of focus for quality improvement in each phase, we can translate objectives into implementation requirements and finally into detailed functional and performance requirements. Here, Integration Resources reports its experience measuring PACS performance relative to phased implementation strategies for three large medical centers. Each medical center had its own objectives for overcoming image management, physical/geographical, and functional/technical barriers. The report outlines (1) principal financial and nonfinancial measures used as performance indicators; (2) implementation strategies chosen by each of the three medical centers; and (3) the results of those strategies as compared with baseline data.

  19. Automated analysis of complex data

    NASA Technical Reports Server (NTRS)

    Saintamant, Robert; Cohen, Paul R.

    1994-01-01

    We have examined some of the issues involved in automating exploratory data analysis, in particular the tradeoff between control and opportunism. We have proposed an opportunistic planning solution for this tradeoff, and we have implemented a prototype, Igor, to test the approach. Our experience in developing Igor was surprisingly smooth. In contrast to earlier versions that relied on rule representation, it was straightforward to increment Igor's knowledge base without causing the search space to explode. The planning representation appears to be both general and powerful, with high level strategic knowledge provided by goals and plans, and the hooks for domain-specific knowledge are provided by monitors and focusing heuristics.

  20. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  1. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  2. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  3. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  4. 77 FR 16937 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-23

    ... Promulgation of Air Quality Implementation Plans; West Virginia; Regional Haze State Implementation Plan AGENCY... limited disapproval of West Virginia's Regional Haze State Implementation Plan (SIP) revision. EPA is... mandatory Class I areas through a regional haze program. EPA is also approving this revision as meeting the...

  5. 77 FR 65151 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... the Federal Register on September 19, 2012. In that action, in response to a remand by the Ninth... Substantial Inadequacy of Implementation Plan; Call for California State Implementation Plan Revision; South... State Implementation Plan (SIP) for the Los Angeles-South Coast Air Basin (South Coast) is substantially...

  6. 40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PLANS Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and..., consultation among federal, State, and local agencies occurred; full implementation plan documentation was... response to comments that are required to be submitted with any implementation plan. EPA will document its...

  7. 40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PLANS Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and..., consultation among federal, State, and local agencies occurred; full implementation plan documentation was... response to comments that are required to be submitted with any implementation plan. EPA will document its...

  8. [An application of the strategy results cycle to HIV/AIDS strategic planning in Latin America].

    PubMed

    Rodríguez-García, Rosalía; Rosenberg, Hernán

    2013-07-01

    To describe the Strategy Results Cycle (SRC), a model that approaches planning as an ongoing cycle of seven phases that continually responds and adapts to existing evidence. Reliable sources were used for the preparation of databases and expenditure-costing data for resources needs analysis. The planning process 6-9 months to complete a national strategic plan that was informed by evidence, focused on results and costed. Knowledge transfer facilitated national leadership and stakeholders' participation. Between 2007 and 2011, 13 of 16 countries adopted the Strategy Results Cycle model. The evidence supported the identification of results and the expenditure-costing analysis improved budget allocation efficiency. The SRC facilitated purposeful participation and added value to previous planning approaches by connecting "thinking" and "doing" which resulted in national strategic plans that are designed by stakeholders, relevant to local conditions, and can guide implementation and resource mobilization.

  9. Exposing ecological and economic costs of the research-implementation gap and compromises in decision making.

    PubMed

    Kareksela, Santtu; Moilanen, Atte; Ristaniemi, Olli; Välivaara, Reima; Kotiaho, Janne S

    2018-02-01

    The frequently discussed gap between conservation science and practice is manifest in the gap between spatial conservation prioritization plans and their implementation. We analyzed the research-implementation gap of one zoning case by comparing results of a spatial prioritization analysis aimed at avoiding ecological impact of peat mining in a regional zoning process with the final zoning plan. We examined the relatively complex planning process to determine the gaps among research, zoning, and decision making. We quantified the ecological costs of the differing trade-offs between ecological and socioeconomic factors included in the different zoning suggestions by comparing the landscape-level loss of ecological features (species occurrences, habitat area, etc.) between the different solutions for spatial allocation of peat mining. We also discussed with the scientists and planners the reasons for differing zoning suggestions. The implemented plan differed from the scientists suggestion in that its focus was individual ecological features rather than all the ecological features for which there were data; planners and decision makers considered effects of peat mining on areas not included in the prioritization analysis; zoning was not truly seen as a resource-allocation process and not emphasized in general minimizing ecological losses while satisfying economic needs (peat-mining potential); and decision makers based their prioritization of sites on site-level information showing high ecological value and on single legislative factors instead of finding a cost-effective landscape-level solution. We believe that if the zoning and decision-making processes are very complex, then the usefulness of science-based prioritization tools is likely to be reduced. Nevertheless, we found that high-end tools were useful in clearly exposing trade-offs between conservation and resource utilization. © 2017 Society for Conservation Biology.

  10. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians consists of the following rules...

  11. Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moe, Wayne; Honma, George

    This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical informationmore » is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.« less

  12. Implementing a Capital Plan.

    ERIC Educational Resources Information Center

    Daigneau, William A.

    2003-01-01

    Addresses four questions regarding implementation of a long-term capital plan to manage a college's facilities portfolio: When should the projects be implemented? How should the capital improvements be implemented? What will it actually cost in terms of project costs as well as operating costs? Who will implement the plan? (EV)

  13. Medicaid and Rural Health

    MedlinePlus

    ... for Success Am I Rural? Evidence-based Toolkits Economic Impact Analysis Tool Community Health Gateway Sustainability Planning ... the past several years due to both the economic recession of 2008 as well as the implementation ...

  14. Project planning, training, measurement and sustainment: the successful implementation of voice recognition.

    PubMed

    Antiles, S; Couris, J; Schweitzer, A; Rosenthal, D; Da Silva, R Q

    2000-01-01

    Computerized voice recognition systems (VR) can reduce costs and enhance service. The capital outlay required for conversion to a VR system is significant; therefore, it is incumbent on radiology departments to provide cost and service justifications to administrators. Massachusetts General Hospital (MGH) in Boston implemented VR over a two-year period and achieved annual savings of $530,000 and a 50% decrease in report throughput. Those accomplishments required solid planning and implementation strategies, training and sustainment programs. This article walks through the process, step by step, in the hope of providing a tool set for future implementations. Because VR has dramatic implications for workflow, a solid operational plan is needed when assessing vendors and planning for implementation. The goals for implementation should be to minimize operational disruptions and capitalize on efficiencies of the technology. Senior leadership--the department chair or vice-chair--must select the goals to be accomplished and oversee, manage and direct the VR initiative. The importance of this point cannot be overstated, since implementation will require behavior changes from radiologists and others who may not perceive any personal benefits. Training is the pivotal factor affecting the success of voice recognition, and practice is the only way for radiologists to enhance their skills. Through practice, radiologists will discover shortcuts, and their speed and comfort will improve. Measurement and data analysis are critical to changing and improving the voice recognition application and are vital to decision-making. Some of the issues about which valuable date can be collected are technical and educational problems, VR penetration, report turnaround time and annual cost savings. Sustained effort is indispensable to the maintenance of voice recognition. Finally, all efforts made and gains achieved may prove to be futile without ongoing sustainment of the system through retraining, education and technical support.

  15. 40 CFR 52.1973 - Approval of plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1973 Approval of plans. (a) Carbon monoxide. (1) EPA approves as a revision to the Oregon State Implementation Plan, the Second... December 27, 2004. (2) EPA approves as a revision to the Oregon State Implementation Plan, the Salem carbon...

  16. 40 CFR 52.1973 - Approval of plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1973 Approval of plans. (a) Carbon monoxide. (1) EPA approves as a revision to the Oregon State Implementation Plan, the Second... December 27, 2004. (2) EPA approves as a revision to the Oregon State Implementation Plan, the Salem carbon...

  17. 40 CFR 52.1973 - Approval of plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1973 Approval of plans. (a) Carbon monoxide. (1) EPA approves as a revision to the Oregon State Implementation Plan, the Second... December 27, 2004. (2) EPA approves as a revision to the Oregon State Implementation Plan, the Salem carbon...

  18. 40 CFR 52.1973 - Approval of plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1973 Approval of plans. (a) Carbon monoxide. (1) EPA approves as a revision to the Oregon State Implementation Plan, the Second... December 27, 2004. (2) EPA approves as a revision to the Oregon State Implementation Plan, the Salem carbon...

  19. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  20. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  1. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  2. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  3. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  4. 76 FR 9706 - Finding of Substantial Inadequacy of Implementation Plan; Call for Iowa State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... advance and available for prompt implementation once triggered. Section 110(k)(5) of the CAA provides that... Environmental protection, Air pollution control, Iowa, Particulate matter, State Implementation Plan. Dated...

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, S; Guerrero, M; Zhang, B

    Purpose: To implement a comprehensive non-measurement-based verification program for patient-specific IMRT QA Methods: Based on published guidelines, a robust IMRT QA program should assess the following components: 1) accuracy of dose calculation, 2) accuracy of data transfer from the treatment planning system (TPS) to the record-and-verify (RV) system, 3) treatment plan deliverability, and 4) accuracy of plan delivery. Results: We have implemented an IMRT QA program that consist of four components: 1) an independent re-calculation of the dose distribution in the patient anatomy with a commercial secondary dose calculation program: Mobius3D (Mobius Medical Systems, Houston, TX), with dose accuracy evaluationmore » using gamma analysis, PTV mean dose, PTV coverage to 95%, and organ-at-risk mean dose; 2) an automated in-house-developed plan comparison system that compares all relevant plan parameters such as MU, MLC position, beam iso-center position, collimator, gantry, couch, field size settings, and bolus placement, etc. between the plan and the RV system; 3) use of the RV system to check the plan deliverability and further confirm using “mode-up” function on treatment console for plans receiving warning; and 4) implementation of a comprehensive weekly MLC QA, in addition to routine accelerator monthly and daily QA. Among 1200 verifications, there were 9 cases of suspicious calculations, 5 cases of delivery failure, no data transfer errors, and no failure of weekly MLC QA. These 9 suspicious cases were due to the PTV extending to the skin or to heterogeneity correction effects, which would not have been caught using phantom measurement-based QA. The delivery failure was due to the rounding variation of MLC position between the planning system and RV system. Conclusion: A very efficient, yet comprehensive, non-measurement-based patient-specific QA program has been implemented and used clinically for about 18 months with excellent results.« less

  6. Assessment of Graph Databases as a Viable Materiel Solution for the Army’s Dynamic Force Structure (DFS) Portal Implementation

    DTIC Science & Technology

    2018-03-30

    information : Francisco L. Loaiza-Lemos, Project Leader floaiza@ida.org, 703-845-687 Margaret E. Myers, Director, Information Technology and Systems...analysis is aligned with the goals and objectives of the Department of Defense (DoD) as expressed in its Global Force Management Data Initiative...the previous phases of the analysis and how can they help inform the decision process for determining the optimal mix needed to implement the planned

  7. Implementing business continuity effectively within the UK National Health Service.

    PubMed

    Roberts, Patrick; Molyneux, Helen

    2010-11-01

    Whereas major incident planning is very well established within National Health Service (NHS) organisations in the UK, business continuity management (BCM) planning, in many cases, is a relatively new activity; however, a combination of factors including the emergence of H1N1 influenza, has led to growing interest in the subject. This paper draws on both the personal experience of the authors and published research in relevant fields to make a number of specific recommendations about the effective implementation of BCM within NHS organisations. These include the need to define the BCM project properly; conduct a thorough business impact analysis considering 'back office' as well as clinical activities; define suitable command and control arrangements with clear delegated authority; and support plan development with appropriate training.

  8. Network access to PCDS (SPAN, ESN, SESNET, ARPANET)

    NASA Technical Reports Server (NTRS)

    Green, J.

    1986-01-01

    One of the major goals of the National Space Science Data Center is to increase access to NASA data systems by enhancing networking activities. The activities are centered around three basic networking systems: the Space Physics Analysis Network (SPAN); the Earth Science Network (ESN); and the NASA Packet Switched System (NPSS). Each system is described, linkages among systems are explained, and future plans are announced. The inclusion of several new climate nodes on SPAN or ESN are also mentioned. Presently, the Pilot Climate Data System is accessible through SPAN and will be accessible through NPSS by summer and ESN by the end of 1986. Ambitious plans for implementation are underway. The implementation of these plans will represent a major advance in the utilization and accessibility of data worldwide.

  9. Computerized physician order entry from a chief information officer perspective.

    PubMed

    Cotter, Carole M

    2004-12-01

    Designing and implementing a computerized physician order entry system in the critical care units of a large urban hospital system is an enormous undertaking. With their significant potential to improve health care and significantly reduce errors, the time for computerized physician order entry or physician order management systems is past due. Careful integrated planning is the key to success, requiring multidisciplinary teams at all levels of clinical and administrative management to work together. Articulated from the viewpoint of the Chief Information Officer of Lifespan, a not-for-profit hospital system in Rhode Island, the vision and strategy preceding the information technology plan, understanding the system's current state, the gap analysis between current and future state, and finally, building and implementing the information technology plan are described.

  10. Development, Implementation, and Evaluation of a Strategic Plan for Improving Physical Plant Management at Southwest Texas Junior College.

    ERIC Educational Resources Information Center

    Box, Wilford Winston

    A study was conducted at Southwest Texas Junior College (STJC) to assess current management practices used by the physical plant maintenance department (PPMD) and to develop a strategic plan for physical plant management. Procedures included an analysis of current management practices and systems that affect physical resources, and periodic and…

  11. An Analysis of Individual Teachers' Development of Instruction Based on ClassScape Program Data

    ERIC Educational Resources Information Center

    Parker, Jason L.

    2011-01-01

    This dissertation was designed to examine and assess the effectiveness of the ClassScape formative assessment tool on the planning, implementation, and evaluation of instruction at a rural middle school in western North Carolina. The teachers had the ClassScape program for 3 years, but were not using the program to plan future instruction. The…

  12. Informing Education Policy in Afghanistan: Using Design of Experiments and Data Envelopment Analysis to Provide Transparency in Complex Simulation

    ERIC Educational Resources Information Center

    Marlin, Benjamin

    2013-01-01

    Education planning provides the policy maker and the decision maker a logical framework in which to develop and implement education policy. At the international level, education planning is often confounded by both internal and external complexities, making the development of education policy difficult. This research presents a discrete event…

  13. Qualitative and Political Issues Impacting Academic Medical Center Strategic Planning--A Methodological Approach. AIR Forum 1982 Paper.

    ERIC Educational Resources Information Center

    Kutina, Kenneth L.; And Others

    A simulation model of an academic medical center that was developed to aid in strategic planning and policy analysis is described. The model, designated MCM for Medical Center Model, was implemented at the School of Medicine, University Hospitals of Cleveland, and the private practices of the faculty in the clinical departments at University…

  14. A Theory of Planned Behaviour-Based Analysis of TIMSS 2011 to Determine Factors Influencing Inquiry Teaching Practices in High-Performing Countries

    ERIC Educational Resources Information Center

    Pongsophon, Pongprapan; Herman, Benjamin C.

    2017-01-01

    Given the abundance of literature describing the strong relationship between inquiry-based teaching and student achievement, more should be known about the factors impacting science teachers' classroom inquiry implementation. This study utilises the theory of planned behaviour to propose and validate a causal model of inquiry-based teaching…

  15. Analysis of pedagogical content knowledge (PCK) ability of science teachers in planning and reflecting on environmental pollution content

    NASA Astrophysics Data System (ADS)

    Purwianingsih, W.; Mardiyah, A.

    2018-05-01

    Pedagogical Content Knowledge (PCK) is a blend of content knowledge and pedagogy knowledge, which can illustrate the ability of teachers to design and to teach a content by accessing what they knows about the material, students, curriculum and how best to teach the content. Description of PCK ability of science teachers can be accessed through an analysis of their ability to plan and reflect on learning. This study aims to provide an overview of teachers’ PCK skills on environmental pollution materials through use of Content Representation (CoRe) and Pedagogical and Professional-experience Repertoires (PaP-eRs). Descriptive method used in this study with six of science teachers on 7th class from three different schools as subject. The results show that teachers’ PCK skills in planning through CoRe and reflecting through PaP-eRs are in fairly good category. The teacher’s ability in implementing environmental pollution learning materials is in good category. However, there is still a discrepancy between planning through CoRe and the implementation of classroom learning. The teacher’s PCK is influenced by teaching experience and educational background.

  16. Reducing fat intake using implementation intentions: A meta-analytic review.

    PubMed

    Vilà, Irene; Carrero, Isabel; Redondo, Raquel

    2017-05-01

    To study the efficacy of forming implementation intentions for fat intake reduction as well as possible moderating variables. Systematic review and meta-analysis of 12 empirical studies (N = 3,323) published in English and Spanish in the Web of Science (Core Collection) and MEDLINE (1990-January 2016) databases. This study found that the efficacy of planning interventions on fat consumption reduction was higher than expected, as a moderate overall effect of implementation intentions was observed (d = 0.488). Moreover, planning for a fat intake reduction seems to be more powerful for men than for women (β = -.623; p = .025) and in cases where there is no monitoring during the intervention (d = 0.671 vs. d = 0.231). Previous research was sceptical of the efficacy of planning in the case of avoiding goals in healthy eating. However, our results show that planning is an efficient intervention that can be used by health education programmes to reduce fat intake and, therefore, increase citizen well-being. These results also support the existence of a key variable in the implementation intentions process, that is, goal complexity, and the presence of two moderating variables, that is, gender and monitoring. Statement of contribution What is already known on this subject? Implementation intentions are action plans subordinate to goal intentions that specify the 'when, where, and how' of responses leading to goal attainment. In healthy eating, the average effect of forming implementation intentions is small to medium, but this efficacy changes depending on the type of intended behaviour. Past evidence shows that the effect size seems to be lower when the intervention aims at reducing unhealthy behaviours versus promoting healthy behaviours. What does this study add? Forming implementation intentions is an efficient intervention to reduce fat intake with a medium overall effect. The efficacy of this intervention is increased when men are targeted and when there is no monitoring during the process. This study introduces a new line of research focused on the study of the effect of planning on complex goals. © 2017 The British Psychological Society.

  17. Developing and Implementing a Citywide Asthma Action Plan: A Community Collaborative Partnership.

    PubMed

    Staudt, Amanda Marie; Alamgir, Hasanat; Long, Debra Lynn; Inscore, Stephen Curtis; Wood, Pamela Runge

    2015-12-01

    Asthma affects 1 in 10 children in the United States, with higher prevalence among children living in poverty. Organizations in San Antonio, Texas, partnered to design and implement a uniform, citywide asthma action plan to improve asthma management capacity in schools. The asthma action plan template was modified from that of the Global Initiative for Asthma. School personnel were trained in symptom recognition, actions to take, and use of equipment before the asthma action plan implementation. The annual Asthma Action Plan Summit was organized as a forum for school nurses, healthcare providers, and members of the community to exchange ideas and strategies on implementation, as well as to revise the plan. The asthma action plan was implemented in all 16 local school districts. Feedback received from school nurses suggests that the citywide asthma action plan resulted in improved asthma management and student health at schools. The evidence in this study suggests that community organizations can successfully collaborate to implement a citywide health initiative similar to the asthma action plan.

  18. The Development and Implementation of a Dental School Strategic Plan.

    ERIC Educational Resources Information Center

    Moreland, Ernest F.; And Others

    1990-01-01

    The University of Maryland Dental School began a comprehensive external and internal analysis of dentistry and dental education. Three analysis groups were established to review the external environment, the competitive environment, and institutional strengths and weaknesses. A strategic directions group identified directions and created a…

  19. Psychotherapeutic and vocational interventions among young adults with work disability due to mental disorders in Finland.

    PubMed

    Mattila-Holappa, Pauliina; Joensuu, Matti; Ahola, Kirsi; Kivekäs, Teija; Kivimäki, Mika; Koskinen, Aki; Virtanen, Marianna

    2018-05-01

    Backround: Little is known about treatment and rehabilitation received and planned among young adults with work disability due to a mental disorder. To examine the implemented psychotherapeutic and vocational interventions and treatment plans among young adults with work disability due to a mental disorder. Data were collected from medical records of young Finnish adults aged 18-34 with a long-term work disability history due to a mental disorder (N = 1163). The participant characteristics associated with four types of interventions were analyzed using log-binomial regression analysis. In total, 34% had participated in a psychotherapeutic intervention. Of the non-students, 26% had participated in vocational intervention. For 46% of the non-students, neither type of intervention was planned. Both implemented and planned psychotherapeutic interventions were associated with female sex, high education, attachment to employment, and absence of substance abuse. Low education and childhood adversity were associated with implemented vocational interventions and absence of substance abuse with planned vocational interventions. There is an unmet need for psychotherapeutic interventions among men, among those with lower socio-economic status, and among those with poor attachment to labor market. In addition, there is a lack of vocational interventions for those with high education. People with substance abuse are largely excluded from both types of interventions.

  20. SU-E-T-492: Implementing a Method for Brain Irradiation in Rats Utilizing a Commercially Available Radiosurgery Irradiator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cates, J; Drzymala, R

    2014-06-01

    Purpose: The purpose of the study was to implement a method for accurate rat brain irradiation using the Gamma Knife Perfexion unit. The system needed to be repeatable, efficient, and dosimetrically and spatially accurate. Methods: A platform (“rat holder”) was made such that it is attachable to the Leskell Gamma Knife G Frame. The rat holder utilizes two ear bars contacting bony anatomy and a front tooth bar to secure the rat. The rat holder fits inside of the Leskell localizer box, which utilizes fiducial markers to register with the GammaPlan planning system. This method allows for accurate, repeatable setup.Amore » cylindrical phantom was made so that film can be placed axially in the phantom. We then acquired CT image sets of the rat holder and localizer box with both a rat and the phantom. Three treatment plans were created: a plan on the rat CT dataset, a phantom plan with the same prescription dose as the rat plan, and a phantom plan with the same delivery time as the rat plan. Results: Film analysis from the phantom showed that our setup is spatially accurate and repeatable. It is also dosimetrically accurate, with an difference between predicted and measured dose of 2.9%. Film analysis with prescription dose equal between rat and phantom plans showed a difference of 3.8%, showing that our phantom is a good representation of the rat for dosimetry purposes, allowing for +/- 3mm diameter variation. Film analysis with treatment time equal showed an error of 2.6%, which means we can deliver a prescription dose within 3% accuracy. Conclusion: Our method for irradiation of rat brain has been shown to be repeatable, efficient, and accurate, both dosimetrically and spatially. We can treat a large number of rats efficiently while delivering prescription doses within 3% at millimeter level accuracy.« less

  1. [The Results of Self-Assessment by Medical Organizations Their Correspondence to Proposals (Practical Recommendations) of the Roszdravnadzor Concerning Organization of Internal Control of Quality and Safety of Medical Activity].

    PubMed

    Ivanov, I V; Shvabsky, O R; Minulin, I B

    2017-11-01

    The article presents the analysis of the results of internal audits (self-rating) in medical organizations implemented on the basis of Proposals (practical guidelines) of the Roszdravnadzor concerning organization of inner control of quality and safety of medical activities in medical organization (hospital). The self-rating was implemented by the medical organizations themselves according the common criteria of the Proposals as provided the following plan: planning of self-rating, collection and processing of data, application of self-rating, analysis of obtained results, preparation of report. The article uses the results of self-rating of medical organizations corresponding to following criteria: profile of activity-multi-field hospital-number of beds more than 350-state property. The self-rating was implemented according to 11 basic parts of the Proposals. The criteria were developed for every part. The evaluation lists developed on the basis of the given Proposals permitted to medical organizations to independently establish problems in their activities. Within the framework of implemented self-rating medical organizations mentioned the directions of activity related to personnel management, identification of personality of patient, support of epidemiological and surgical safety as having significant discrepancies with the Proposals and requiring implementation of improvement measures.

  2. An emulator for minimizing finite element analysis implementation resources

    NASA Technical Reports Server (NTRS)

    Melosh, R. J.; Utku, S.; Salama, M.; Islam, M.

    1982-01-01

    A finite element analysis emulator providing a basis for efficiently establishing an optimum computer implementation strategy when many calculations are involved is described. The SCOPE emulator determines computer resources required as a function of the structural model, structural load-deflection equation characteristics, the storage allocation plan, and computer hardware capabilities. Thereby, it provides data for trading analysis implementation options to arrive at a best strategy. The models contained in SCOPE lead to micro-operation computer counts of each finite element operation as well as overall computer resource cost estimates. Application of SCOPE to the Memphis-Arkansas bridge analysis provides measures of the accuracy of resource assessments. Data indicate that predictions are within 17.3 percent for calculation times and within 3.2 percent for peripheral storage resources for the ELAS code.

  3. Post-test navigation data analysis techniques for the shuttle ALT

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Postflight test analysis data processing techniques for shuttle approach and landing tests (ALT) navigation data are defined. Postfight test processor requirements are described along with operational and design requirements, data input requirements, and software test requirements. The postflight test data processing is described based on the natural test sequence: quick-look analysis, postflight navigation processing, and error isolation processing. Emphasis is placed on the tradeoffs that must remain open and subject to analysis until final definition is achieved in the shuttle data processing system and the overall ALT plan. A development plan for the implementation of the ALT postflight test navigation data processing system is presented. Conclusions are presented.

  4. Participatory System Dynamics Modeling: Increasing Stakeholder Engagement and Precision to Improve Implementation Planning in Systems.

    PubMed

    Zimmerman, Lindsey; Lounsbury, David W; Rosen, Craig S; Kimerling, Rachel; Trafton, Jodie A; Lindley, Steven E

    2016-11-01

    Implementation planning typically incorporates stakeholder input. Quality improvement efforts provide data-based feedback regarding progress. Participatory system dynamics modeling (PSD) triangulates stakeholder expertise, data and simulation of implementation plans prior to attempting change. Frontline staff in one VA outpatient mental health system used PSD to examine policy and procedural "mechanisms" they believe underlie local capacity to implement evidence-based psychotherapies (EBPs) for PTSD and depression. We piloted the PSD process, simulating implementation plans to improve EBP reach. Findings indicate PSD is a feasible, useful strategy for building stakeholder consensus, and may save time and effort as compared to trial-and-error EBP implementation planning.

  5. R&D Implementation in a Department of Laboratory Medicine and Pathology: A Systematic Review Based on Pharmaceutical Companies

    PubMed Central

    Feulefack, Joseph; Sergi, Consolato

    2015-01-01

    A systematic literature review on pharmaceutical companies may be a tool for guiding some procedures of R&D implementation in a department of Laboratory Medicine and Pathology. The use of pharmaceutical companies for this specific analysis arises from less variability of standards than healthcare facilities. In this qualitative and quantitative analysis, we focused on three useful areas of implementation, including R&D productivity, commercialization strategies, and expenditures determinants of pharmaceutical companies. Studies and reports of online databases from 1965 to 2014 were reviewed according to specific search terms. Initially, 218 articles and reports were found and examined, but only 91 were considered appropriate and used for further analysis. We identified some suggested implementation strategies relevant for marketing to enhance companies’ own R&D strategies; such as reliability of companies on “sourcing-in” R&D facilities and “think-tank” events. Regardless of the study and of the country, cash flow and profitability always positively influenced R&D expenditure, while sales and firm size did not. We consider that handling R&D determinants should require caution. It seems critical that implementation of R&D systems is directly related with productivity, if it reflects dual embodiment of efficiency and effectiveness. Scrutinizing the determinants of R&D expenditures emphasizes significant factors that are worth to highlight when planning an R&D investment strategy. Although there is no receipt fitting every situation, we think that health care plan makers may find relevant data in this systematic review in creating an initial implementation framework. PMID:25946935

  6. R&D implementation in a department of laboratory medicine and pathology: a systematic review based on pharmaceutical companies.

    PubMed

    Feulefack, Joseph; Sergi, Consolato

    2015-01-01

    A systematic literature review on pharmaceutical companies may be a tool for guiding some procedures of R&D implementation in a department of Laboratory Medicine and Pathology. The use of pharmaceutical companies for this specific analysis arises from less variability of standards than healthcare facilities. In this qualitative and quantitative analysis, we focused on three useful areas of implementation, including R&D productivity, commercialization strategies, and expenditures determinants of pharmaceutical companies. Studies and reports of online databases from 1965 to 2014 were reviewed according to specific search terms. Initially, 218 articles and reports were found and examined, but only 91 were considered appropriate and used for further analysis.  We identified some suggested implementation strategies relevant for marketing to enhance companies' own R&D strategies; such as reliability of companies on "sourcing-in" R&D facilities and "think-tank" events. Regardless of the study and of the country, cash flow and profitability always positively influenced R&D expenditure, while sales and firm size did not. We consider that handling R&D determinants should require caution. It seems critical that implementation of R&D systems is directly related with productivity, if it reflects dual embodiment of efficiency and effectiveness. Scrutinizing the determinants of R&D expenditures emphasizes significant factors that are worth to highlight when planning an R&D investment strategy. Although there is no receipt fitting every situation, we think that health care plan makers may find relevant data in this systematic review in creating an initial implementation framework.

  7. 75 FR 54805 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Carbon Monoxide (CO...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... Promulgation of Air Quality Implementation Plans; Minnesota; Carbon Monoxide (CO) Limited Maintenance Plan for... June 16, 2010, to revise the Minnesota State Implementation Plan (SIP) for carbon monoxide (CO) under the Clean Air Act (CAA). The State has submitted a limited maintenance plan for CO showing continued...

  8. 40 CFR 49.9861 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9861 Identification of plan. This section and §§ 49.9862 through 49.9890 contain the implementation plan for the Burns Paiute Tribe of the Burns...

  9. 75 FR 63139 - Approval and Promulgation of Implementation Plans-Maricopa County (Phoenix) PM-10 Nonattainment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-14

    ... Promulgation of Implementation Plans--Maricopa County (Phoenix) PM-10 Nonattainment Area; Serious Area Plan for... implementation plan (SIP) revisions submitted by the State of Arizona to meet, among other requirements, section... (Maricopa area). Specifically, EPA proposed to disapprove provisions of the 189(d) plan because they do not...

  10. Design, implementation, and first-year outcomes of a value-based drug formulary.

    PubMed

    Sullivan, Sean D; Yeung, Kai; Vogeler, Carol; Ramsey, Scott D; Wong, Edward; Murphy, Chad O; Danielson, Dan; Veenstra, David L; Garrison, Louis P; Burke, Wylie; Watkins, John B

    2015-04-01

    Value-based insurance design attempts to align drug copayment tier with value rather than cost. Previous implementations of value-based insurance design have lowered copayments for drugs indicated for select "high value" conditions and have found modest improvements in medication adherence. However, these implementations have generally not resulted in cost savings to the health plan, suggesting a need for increased copayments for "low value" drugs. Further, previous implementations have assigned equal copayment reductions to all drugs within a therapeutic area without assessing the value of individual drugs. Aligning the individual drug's copayment to its specific value may yield greater clinical and economic benefits. In 2010, Premera Blue Cross, a large not-for-profit health plan in the Pacific Northwest, implemented a value-based drug formulary (VBF) that explicitly uses cost-effectiveness analyses after safety and efficacy reviews to estimate the value of each individual drug. Concurrently, Premera increased copayments for existing tiers. To describe and evaluate the design, implementation, and first-year outcomes of the VBF. We compared observed pharmacy cost per member per month in the year following the VBF implementation with 2 comparator groups: (1) observed pharmacy costs in the year prior to implementation, and (2) expected costs if no changes were made to the pharmacy benefits. Expected costs were generated by applying autoregressive integrated moving averages to pharmacy costs over the previous 36 months. We used an interrupted time series analysis to assess drug use and adherence among individuals with diabetes, hypertension, or dyslipidemia compared with a group of members in plans that did not implement a VBF.  Pharmacy costs decreased by 3% compared with the 12 months prior and 11% compared with expected costs. There was no significant decline in medication use or adherence to treatments for patients with diabetes, hypertension, or dyslipidemia. The VBF and copayment changes enabled pharmacy plan cost savings without negatively affecting utilization in key disease states.

  11. Acquisition for the Future: Imagination, Innovation, and Implementation. Research and Reality: Closing the Gap

    DTIC Science & Technology

    1993-01-01

    adequate to this author to attend an out-of- assure the driver and passengers town class on planning . Since that the auto was in good the customer...Theory." Advances in Financial Planning Society of Cost Estimating & Analysis and Forecasting 2 (1987): 269-302. (October 1991): 4-8. 13. . "International...assessed if these milestones are U.S. firms plans to replace with newer not met. Unless you have a good equipment. However, credibility could be prior

  12. A theory of planned behaviour-based analysis of TIMSS 2011 to determine factors influencing inquiry teaching practices in high-performing countries

    NASA Astrophysics Data System (ADS)

    Pongsophon, Pongprapan; Herman, Benjamin C.

    2017-07-01

    Given the abundance of literature describing the strong relationship between inquiry-based teaching and student achievement, more should be known about the factors impacting science teachers' classroom inquiry implementation. This study utilises the theory of planned behaviour to propose and validate a causal model of inquiry-based teaching through analysing data relating to high-performing countries retrieved from the 2011 Trends in International Mathematics and Science Study assessments. Data analysis was completed through structural equation modelling using a polychoric correlation matrix for data input and diagonally weighted least squares estimation. Adequate fit of the full model to the empirical data was realised. The model demonstrates that the extent the teachers participated in academic collaborations was positively related to their occupational satisfaction, confidence in teaching inquiry, and classroom inquiry practices. Furthermore, the teachers' confidence with implementing inquiry was positively related to their classroom inquiry implementation and occupational satisfaction. However, perceived student-generated constraints demonstrated a negative relationship with the teachers' confidence with implementing inquiry and occupational satisfaction. Implications from this study include supporting teachers through promoting collaborative opportunities that facilitate inquiry-based practices and occupational satisfaction.

  13. Transitioning Domain Analysis: An Industry Experience.

    DTIC Science & Technology

    1996-06-01

    References 6 Implementation 6.1 Analysis of Operator Services’ Requirements Process 21 6.2 Preliminary Planning for FODA Training by SEI 21...an academic and industry partnership took feature oriented domain analysis ( FODA ) from a methodology that is still being defined to a well-documented...to pilot the use of the Software Engineering Institute (SEI) domain analysis methodology known as feature-oriented domain analysis ( FODA ). Supported

  14. System for Urban Stormwater Treatment and Analysis IntegratioN (SUSTAIN)

    EPA Pesticide Factsheets

    SUSTAIN is a decision support system that assists stormwater management professionals with developing and implementing plans for flow and pollution control measures to protect source waters and meet water quality goals.

  15. Automated Pedestrian Detection, Count and Analysis System

    DOT National Transportation Integrated Search

    2015-04-15

    Pedestrian and bicycle count data is necessary for transportation planning, implementing safety countermeasures, and traffic management. This data is critical when evaluating the pedestrian level of service of safety (LOSS) and pedestrian safety perf...

  16. Planning for successful outcomes in the new millennium.

    PubMed

    Matthews, P

    2000-02-01

    The complexity of the health care environment will increase in the next millennium. Organizations must adopt an approach of selecting outcomes management solutions that are focused on data capture, analysis, and comparative reviews and reporting. They must decisively and creatively implement, in a phased approach, integrated solutions from existing robust systems, while considering future systems targeted for implementation. Outcomes management solutions must be integrated with the organization's information systems strategic plan. The successful organization must be able to turn business-critical data into information that supports both business and clinical decision-making activities. In short, health care organizations will have to become information-driven.

  17. Incipient fault detection study for advanced spacecraft systems

    NASA Technical Reports Server (NTRS)

    Milner, G. Martin; Black, Michael C.; Hovenga, J. Mike; Mcclure, Paul F.

    1986-01-01

    A feasibility study to investigate the application of vibration monitoring to the rotating machinery of planned NASA advanced spacecraft components is described. Factors investigated include: (1) special problems associated with small, high RPM machines; (2) application across multiple component types; (3) microgravity; (4) multiple fault types; (5) eight different analysis techniques including signature analysis, high frequency demodulation, cepstrum, clustering, amplitude analysis, and pattern recognition are compared; and (6) small sample statistical analysis is used to compare performance by computation of probability of detection and false alarm for an ensemble of repeated baseline and faulted tests. Both detection and classification performance are quantified. Vibration monitoring is shown to be an effective means of detecting the most important problem types for small, high RPM fans and pumps typical of those planned for the advanced spacecraft. A preliminary monitoring system design and implementation plan is presented.

  18. From Policy to Practice: Implementation of Treatment for Substance Misuse in Québec Primary Healthcare Clinics

    PubMed Central

    Maynard, Serge; Campbell, Emily; Boodhoo, Katie; Gauthier, Gail; Xenocostas, Spyridoula; Charney, Dara A.

    2015-01-01

    Background and Objectives: In 2007, the Québec Ministry of Health issued a policy document that specifically mandated the development of addiction treatment services including screening, brief interventions and referral (SBIR) to be delivered by primary healthcare clinics throughout Québec. The current study examined the level of implementation of SBIR one year following the end of the mandate (2007–2012). Approach: Semi-structured interviews were conducted with 45 participants from 21 primary health and social service centres throughout the province. Qualitative analysis was used to evaluate the level of success each centre had in implementing SBIR and to identify organizational measures that contributed to successful implementation. Results: The results show that Québec primary health and social service centres had limited success in their efforts to integrate SBIR into their services. A comparative analysis of the centres, categorized according to their level of implementation, revealed the presence of significant organizational- and staff-level factors, including the creation of formal action plans that were conducive to the successful implementation of SBIR in primary care. Conclusion: The findings highlight the importance of offering support and guidance, as well as a menu of specific practices that are likely to assist primary health and social services centres to implement SBIR. At the organizational level, the adoption of local action plans and formal service trajectories offers a framework that allows for horizontal and vertical integration of new practices. PMID:26742118

  19. From Policy to Practice: Implementation of Treatment for Substance Misuse in Québec Primary Healthcare Clinics.

    PubMed

    Maynard, Serge; Campbell, Emily; Boodhoo, Katie; Gauthier, Gail; Xenocostas, Spyridoula; Charney, Dara A; Gill, Kathryn

    2015-11-01

    In 2007, the Québec Ministry of Health issued a policy document that specifically mandated the development of addiction treatment services including screening, brief interventions and referral (SBIR) to be delivered by primary healthcare clinics throughout Québec. The current study examined the level of implementation of SBIR one year following the end of the mandate (2007-2012). Semi-structured interviews were conducted with 45 participants from 21 primary health and social service centres throughout the province. Qualitative analysis was used to evaluate the level of success each centre had in implementing SBIR and to identify organizational measures that contributed to successful implementation. The results show that Québec primary health and social service centres had limited success in their efforts to integrate SBIR into their services. A comparative analysis of the centres, categorized according to their level of implementation, revealed the presence of significant organizational- and staff-level factors, including the creation of formal action plans that were conducive to the successful implementation of SBIR in primary care. The findings highlight the importance of offering support and guidance, as well as a menu of specific practices that are likely to assist primary health and social services centres to implement SBIR. At the organizational level, the adoption of local action plans and formal service trajectories offers a framework that allows for horizontal and vertical integration of new practices. Copyright © 2015 Longwoods Publishing.

  20. Stakeholder perspectives on implementing a universal Lynch syndrome screening program: a qualitative study of early barriers and facilitators.

    PubMed

    Schneider, Jennifer L; Davis, James; Kauffman, Tia L; Reiss, Jacob A; McGinley, Cheryl; Arnold, Kathleen; Zepp, Jamilyn; Gilmore, Marian; Muessig, Kristin R; Syngal, Sapna; Acheson, Louise; Wiesner, Georgia L; Peterson, Susan K; Goddard, Katrina A B

    2016-02-01

    Evidence-based guidelines recommend that all newly diagnosed colon cancer be screened for Lynch syndrome (LS), but best practices for implementing universal tumor screening have not been extensively studied. We interviewed a range of stakeholders in an integrated health-care system to identify initial factors that might promote or hinder the successful implementation of a universal LS screening program. We conducted interviews with health-plan leaders, managers, and staff. Interviews were audio-recorded and transcribed. Thematic analysis began with a grounded approach and was also guided by the Practical Robust Implementation and Sustainability Model (PRISM). We completed 14 interviews with leaders/managers and staff representing involved clinical and health-plan departments. Although stakeholders supported the concept of universal screening, they identified several internal (organizational) and external (environment) factors that promote or hinder implementation. Facilitating factors included perceived benefits of screening for patients and organization, collaboration between departments, and availability of organizational resources. Barriers were also identified, including: lack of awareness of guidelines, lack of guideline clarity, staffing and program "ownership" concerns, and cost uncertainties. Analysis also revealed nine important infrastructure-type considerations for successful implementation. We found that clinical, laboratory, and administrative departments supported universal tumor screening for LS. Requirements for successful implementation may include interdepartmental collaboration and communication, patient and provider/staff education, and significant infrastructure and resource support related to laboratory processing and systems for electronic ordering and tracking.

  1. 76 FR 4579 - Approval and Promulgation of Air Quality Implementation Plan; New Jersey and New York...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... supported by an adequate technical analysis. EPA recommended the various types of information that could be...) must be supported by an adequate technical analysis. In the 2009 Guidance, EPA recommended the various...) because the State did not evaluate or demonstrate with a technical analysis that the emissions reduction...

  2. 76 FR 4584 - Approval and Promulgation of Air Quality Implementation Plans; Georgia; Disapproval of Interstate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... conclusion must be supported by an adequate technical analysis. Second, EPA recommended the various types of... requirement of section 110(a)(2)(D)(i)(I) must be supported by an adequate technical analysis. Additionally... evaluate or demonstrate with a technical analysis that this measure and their intention to rely to the...

  3. Preparation of the implementation plan of AASHTO Mechanistic-Empirical Pavement Design Guide (M-EPDG) in Connecticut : Phase II : expanded sensitivity analysis and validation with pavement management data.

    DOT National Transportation Integrated Search

    2017-02-08

    The study re-evaluates distress prediction models using the Mechanistic-Empirical Pavement Design Guide (MEPDG) and expands the sensitivity analysis to a wide range of pavement structures and soils. In addition, an extensive validation analysis of th...

  4. Motivation and Front-End Analysis.

    ERIC Educational Resources Information Center

    Harless, Joe

    1978-01-01

    Relates Front-End Analysis (FEA) to motivation by categorizing it as either Diagnostic FEA or Planning FEA. The former is used to diagnose existing problems and prescribe motivational programs; the latter assumes that motivational programs must be implemented, along with other programs, to build the optimum environment to support the performance.…

  5. 78 FR 27883 - Approval and Promulgation of State Implementation Plans; State of Montana; Interstate Transport...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ... PM 2.5 NAAQS in other states. Modeling can be relied on when acceptable modeling technical analyses... on relevant data and factors. MDEQ's submission contains no technical analysis of potential... analysis relies on factors irrelevant to the 2006 PM 2.5 [[Page 27886

  6. A "Quick & Dirty" Strategic Audit

    ERIC Educational Resources Information Center

    Brawley, Dorothy E.

    2016-01-01

    In teaching Strategic Management, it is imperative that students first learn how to audit the firm before they begin analysis, planning and implementation. Unfortunately this is a step often overlooked. Without a complete and up to date audit, any analysis conducted would have questionable validity and reliability. This report focuses on an…

  7. Design requirements for SRB production control system. Volume 4: Implementation

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The implementation plan which is presented was developed to provide the means for the successful implementation of the automated production control system. There are three factors which the implementation plan encompasses: detailed planning; phased implementation; and user involvement. The plan is detailed to the task level in terms of necessary activities as the system is developed, refined, installed, and tested. These tasks are scheduled, on a preliminary basis, over a two-and-one-half-year time frame.

  8. Development of k-300 concrete mix for earthquake-resistant Housing infrastructure in indonesia

    NASA Astrophysics Data System (ADS)

    Zulkarnain, Fahrizal

    2018-03-01

    In determining the strength of K-300 concrete mix that is suitable for earthquake-resistant housing infrastructure, it is necessary to research the materials to be used for proper quality and quantity so that the mixture can be directly applied to the resident’s housing, in the quake zone. In the first stage, the examination/sieve analysis of the fine aggregate or sand, and the sieve analysis of the coarse aggregate or gravel will be carried out on the provided sample weighing approximately 40 kilograms. Furthermore, the specific gravity and absorbance of aggregates, the examination of the sludge content of aggregates passing the sieve no. 200, and finally, examination of the weight of the aggregate content. In the second stage, the planned concrete mix by means of the Mix Design K-300 is suitable for use in Indonesia, with implementation steps: Planning of the cement water factor (CWF), Planning of concrete free water (Liters / m3), Planning of cement quantity, Planning of minimum cement content, Planning of adjusted cement water factor, Planning of estimated aggregate composition, Planning of estimated weight of concrete content, Calculation of composition of concrete mixture, Calculation of mixed correction for various water content. Implementation of the above tests also estimates the correction of moisture content and the need for materials of mixture in kilograms for the K-300 mixture, so that the slump inspection result will be achieved in planned 8-12 cm. In the final stage, a compressive strength test of the K-300 experimental mixture is carried out, and subsequently the composition of the K-300 concrete mixture suitable for one sack of cement of 50 kg is obtained for the foundation of the proper dwelling. The composition is consists of use of Cement, Sand, Gravel, and Water.

  9. Clinical implementation and failure mode and effects analysis of HDR skin brachytherapy using Valencia and Leipzig surface applicators.

    PubMed

    Sayler, Elaine; Eldredge-Hindy, Harriet; Dinome, Jessie; Lockamy, Virginia; Harrison, Amy S

    2015-01-01

    The planning procedure for Valencia and Leipzig surface applicators (VLSAs) (Nucletron, Veenendaal, The Netherlands) differs substantially from CT-based planning; the unfamiliarity could lead to significant errors. This study applies failure modes and effects analysis (FMEA) to high-dose-rate (HDR) skin brachytherapy using VLSAs to ensure safety and quality. A multidisciplinary team created a protocol for HDR VLSA skin treatments and applied FMEA. Failure modes were identified and scored by severity, occurrence, and detectability. The clinical procedure was then revised to address high-scoring process nodes. Several key components were added to the protocol to minimize risk probability numbers. (1) Diagnosis, prescription, applicator selection, and setup are reviewed at weekly quality assurance rounds. Peer review reduces the likelihood of an inappropriate treatment regime. (2) A template for HDR skin treatments was established in the clinic's electronic medical record system to standardize treatment instructions. This reduces the chances of miscommunication between the physician and planner as well as increases the detectability of an error. (3) A screen check was implemented during the second check to increase detectability of an error. (4) To reduce error probability, the treatment plan worksheet was designed to display plan parameters in a format visually similar to the treatment console display, facilitating data entry and verification. (5) VLSAs are color coded and labeled to match the electronic medical record prescriptions, simplifying in-room selection and verification. Multidisciplinary planning and FMEA increased detectability and reduced error probability during VLSA HDR brachytherapy. This clinical model may be useful to institutions implementing similar procedures. Copyright © 2015 American Brachytherapy Society. Published by Elsevier Inc. All rights reserved.

  10. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  11. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  12. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  13. 75 FR 3680 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ... the California State Implementation Plan AGENCY: Environmental Protection Agency (EPA). ACTION... Pollution Control District (SJVAPCD) portion of the California State Implementation Plan (SIP). These... are taking comments on this proposal and plan to follow with a final action. DATES: Any comments must...

  14. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 2 2014-10-01 2014-10-01 false Response plan implementation. 130.33 Section 130... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a...

  15. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Response plan implementation. 130.33 Section 130... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a...

  16. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 2 2011-10-01 2011-10-01 false Response plan implementation. 130.33 Section 130... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a...

  17. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 2 2012-10-01 2012-10-01 false Response plan implementation. 130.33 Section 130... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a...

  18. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 2 2013-10-01 2013-10-01 false Response plan implementation. 130.33 Section 130... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a...

  19. 76 FR 28195 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Sunland Park 1-Hour...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-16

    ... Promulgation of Air Quality Implementation Plans; New Mexico; Sunland Park 1-Hour Ozone Maintenance Plan AGENCY... the New Mexico State Implementation Plan (SIP). The revision consists of a maintenance plan for Sunland Park, New Mexico developed to ensure continued attainment of the 8-hour ozone National Ambient Air...

  20. Design and Implementation of the PMS Module for ’Argos’

    DTIC Science & Technology

    1989-12-01

    designing , and implementing a fully workable Planned Maintenance System (PMS). This implementation demonstrates both the capabilities and benefits such a...analyzing, designing , and implementing a fully workable Planned Maintenance System (PMS). This implementation demonstrates both the capabilities and... design and implementation. PMS is the system developed by the navy to provide each ship, department, and supervisor with the tools needed to plan

  1. Implementation of Discharge Plans for Chronically Ill Elders Discharged Home.

    ERIC Educational Resources Information Center

    Proctor, Enola K.; And Others

    1996-01-01

    Addresses the extent to which discharge plans for elderly patients with congestive heart failure were implemented as planned, tested the consequences of implementation problems, and identified factors associated with implementation problems. Implications for hospital discharge planners and home health care are discussed. (KW)

  2. Strengthening of competence planning truss through instructional media development details

    NASA Astrophysics Data System (ADS)

    Handayani, Sri; Nurcahyono, M. Hadi

    2017-03-01

    Competency-Based Learning is a model of learning in which the planning, implementation, and assessment refers to the mastery of competencies. Learning in lectures conducted in the framework for comprehensively realizing student competency. Competence means the orientation of the learning activities in the classroom must be given to the students to be more active learning, active search for information themselves and explore alone or with friends in learning activities in pairs or in groups, learn to use a variety of learning resources and printed materials, electronic media, as well as environment. Analysis of learning wooden structure known weakness in the understanding of the truss detail. Hence the need for the development of media that can provide a clear picture of what the structure of the wooden horses and connection details. Development of instructional media consisted of three phases of activity, namely planning, production and assessment. Learning Media planning should be tailored to the needs and conditions necessary to provide reinforcement to the mastery of competencies, through the table material needs. The production process of learning media is done by using hardware (hardware) and software (software) to support the creation of a medium of learning. Assessment of the media poduk yan include feasibility studies, namely by subject matter experts, media experts, while testing was done according to the student's perception of the product. The results of the analysis of the materials for the instructional aspects of the results obtained 100% (very good) and media analysis for the design aspects of the media expressed very good with a percentage of 88.93%. While the analysis of student perceptions expressed very good with a percentage of 84.84%. Media Learning Truss Details feasible and can be used in the implementation of learning wooden structure to provide capacity-building in planning truss

  3. Benefits and Challenges of Linking Green Infrastructure and Highway Planning in the United States

    NASA Astrophysics Data System (ADS)

    Marcucci, Daniel J.; Jordan, Lauren M.

    2013-01-01

    Landscape-level green infrastructure creates a network of natural and semi-natural areas that protects and enhances ecosystem services, regenerative capacities, and ecological dynamism over long timeframes. It can also enhance quality of life and certain economic activity. Highways create a network for moving goods and services efficiently, enabling commerce, and improving mobility. A fundamentally profound conflict exists between transportation planning and green infrastructure planning because they both seek to create connected, functioning networks across the same landscapes and regions, but transportation networks, especially in the form of highways, fragment and disconnect green infrastructure networks. A key opportunity has emerged in the United States during the last ten years with the promotion of measures to link transportation and environmental concerns. In this article we examined the potential benefits and challenges of linking landscape-level green infrastructure planning and implementation with integrated transportation planning and highway project development in the United States policy context. This was done by establishing a conceptual model that identified logical flow lines from planning to implementation as well as the potential interconnectors between green infrastructure and highway infrastructure. We analyzed the relationship of these activities through literature review, policy analysis, and a case study of a suburban Maryland, USA landscape. We found that regionally developed and adopted green infrastructure plans can be instrumental in creating more responsive regional transportation plans and streamlining the project environmental review process while enabling better outcomes by enabling more targeted mitigation. In order for benefits to occur, however, landscape-scale green infrastructure assessments and plans must be in place before integrated transportation planning and highway project development occurs. It is in the transportation community's interests to actively facilitate green infrastructure planning because it creates a more predictable environmental review context. On the other hand, for landscape-level green infrastructure, transportation planning and development is much more established and better funded and can provide a means of supporting green infrastructure planning and implementation, thereby enhancing conservation of ecological function.

  4. Benefits and challenges of linking green infrastructure and highway planning in the United States.

    PubMed

    Marcucci, Daniel J; Jordan, Lauren M

    2013-01-01

    Landscape-level green infrastructure creates a network of natural and semi-natural areas that protects and enhances ecosystem services, regenerative capacities, and ecological dynamism over long timeframes. It can also enhance quality of life and certain economic activity. Highways create a network for moving goods and services efficiently, enabling commerce, and improving mobility. A fundamentally profound conflict exists between transportation planning and green infrastructure planning because they both seek to create connected, functioning networks across the same landscapes and regions, but transportation networks, especially in the form of highways, fragment and disconnect green infrastructure networks. A key opportunity has emerged in the United States during the last ten years with the promotion of measures to link transportation and environmental concerns. In this article we examined the potential benefits and challenges of linking landscape-level green infrastructure planning and implementation with integrated transportation planning and highway project development in the United States policy context. This was done by establishing a conceptual model that identified logical flow lines from planning to implementation as well as the potential interconnectors between green infrastructure and highway infrastructure. We analyzed the relationship of these activities through literature review, policy analysis, and a case study of a suburban Maryland, USA landscape. We found that regionally developed and adopted green infrastructure plans can be instrumental in creating more responsive regional transportation plans and streamlining the project environmental review process while enabling better outcomes by enabling more targeted mitigation. In order for benefits to occur, however, landscape-scale green infrastructure assessments and plans must be in place before integrated transportation planning and highway project development occurs. It is in the transportation community's interests to actively facilitate green infrastructure planning because it creates a more predictable environmental review context. On the other hand, for landscape-level green infrastructure, transportation planning and development is much more established and better funded and can provide a means of supporting green infrastructure planning and implementation, thereby enhancing conservation of ecological function.

  5. Measles prevention in adolescents: lessons learnt from implementing a high school catch-up vaccination programme in New South Wales, Australia, 2014–2015

    PubMed Central

    Seale, Holly; Sheppeard, Vicky; Campbell-Lloyd, Sue

    2016-01-01

    Introduction In response to a significant increase of measles cases and a high percentage of unvaccinated adolescents in New South Wales, Australia, a measles high school catch-up vaccination programme was implemented between August and December 2014. This study aimed to explore the factors affecting school-based supplementary immunization activities (SIAs) and to inform future SIA and routine school-based vaccination programme implementation and service provision. Methods Focus group analysis was conducted among public health unit (PHU) staff responsible for implementing the SIA catch-up programme. Key areas discussed were pre-programme planning, implementation, resources, consent materials, media activity and future directions for school vaccination programme delivery. Sessions were audio recorded, transcribed verbatim and reviewed. Thematic analysis was conducted to identify the major themes. Results Two independent focus groups with 32 participants were conducted in January 2015. Barriers to the SIA implementation included lead time, consent processes, interagency collaboration, access to the targeted cohort and the impact of introducing a SIA to an already demanding curriculum and school programme immunization schedule. A positive PHU school coordinator rapport and experience of PHU staff facilitated the implementation. Consideration of different approaches for pre-clinic vaccination status checks, student involvement in the vaccination decision, online consent, workforce sharing between health districts and effective programme planning time were identified for improving future SIA implementation. Conclusion Although many barriers to school programme implementation have been identified in this study, with adequate resourcing and lead time, SIAs implemented via a routine school vaccination programme are an appropriate model to target adolescents. PMID:27757258

  6. Le Nouveau Manuel de Formation sur l'Elaboration et la Gestion des Projets. (The New Project Design and Management Workshop Training Manual).

    ERIC Educational Resources Information Center

    Peace Corps, Washington, DC. Information Collection and Exchange Div.

    A french language version of a training manual that presents guidelines for planning and conducting a project design and management (PDM) workshop to teach Peace Corps volunteers to involve local community members in the process of using participatory analysis tools and planning and implementing projects meeting local desires and needs. The first…

  7. What Teachers in Pre-Vocational Education Should Teach and What They Actually Teach: A Comparison of Curricula and Teaching in Germany and China

    ERIC Educational Resources Information Center

    Pilz, Matthias; Li, Jun

    2012-01-01

    This article compares the pre-vocational education curriculum plans in lower-secondary schools in Germany and Mainland China, and their implementation. Choosing the curricula of certain school types in two selected regions in both countries, this research first carries out a content analysis of the curriculum plans, using the criteria developed…

  8. SU-F-P-37: Implementation of An End-To-End QA Test of the Radiation Therapy Imaging, Planning and Delivery Process to Identify and Correct Possible Sources of Deviation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salinas Aranda, F; Suarez, V; Arbiser, S

    2016-06-15

    Purpose: To implement an end-to-end QA test of the radiation therapy imaging, planning and delivery process, aimed to assess the dosimetric agreement accuracy between planned and delivered treatment, in order to identify and correct possible sources of deviation. To establish an internal standard for machine commissioning acceptance. Methods: A test involving all steps of the radiation therapy: imaging, planning and delivery process was designed. The test includes analysis of point dose and planar dose distributions agreement between TPS calculated and measured dose. An ad hoc 16 cm diameter PMMA phantom was constructed with one central and four peripheral bores thatmore » can accommodate calibrated electron density inserts. Using Varian Eclipse 10.0 and Elekta XiO 4.50 planning systems, IMRT, RapidArc and 3DCRT with hard and dynamic wedges plans were planned on the phantom and tested. An Exradin A1SL chamber is used with a Keithley 35617EBS electrometer for point dose measurements in the phantom. 2D dose distributions were acquired using MapCheck and Varian aS1000 EPID.Gamma analysis was performed for evaluation of 2D dose distribution agreement using MapCheck software and Varian Portal Dosimetry Application.Varian high energy Clinacs Trilogy, 2100C/CD, 2000CR and low energy 6X/EX where tested.TPS-CT# vs. electron density table were checked for CT-scanners used. Results: Calculated point doses were accurate to 0.127% SD: 0.93%, 0.507% SD: 0.82%, 0.246% SD: 1.39% and 0.012% SD: 0.01% for LoX-3DCRT, HiX-3DCRT, IMRT and RapidArc plans respectively. Planar doses pass gamma 3% 3mm in all cases and 2% 2mm for VMAT plans. Conclusion: Implementation of a simple and reliable quality assurance tool was accomplished. The end-to-end proved efficient, showing excellent agreement between planned and delivered dose evidencing strong consistency of the whole process from imaging through planning to delivery. This test can be used as a first step in beam model acceptance for clinical use.« less

  9. Self-management behaviour and support among primary care COPD patients: cross-sectional analysis of data from the Birmingham Chronic Obstructive Pulmonary Disease Cohort.

    PubMed

    Khan, Ainee; Dickens, Andrew P; Adab, Peymane; Jordan, Rachel E

    2017-07-20

    Self-management support for chronic obstructive pulmonary disease (COPD) patients is recommended by UK national guidelines, but extent of implementation is unknown. We aimed to describe self-management behaviour and support among COPD patients and explore behaviour associated with having a self-management plan. We undertook cross-sectional analysis of self-reported data from diagnosed COPD patients in the Birmingham COPD Cohort study. Questionnaire items relevant to self-management behaviour, knowledge of COPD, receipt of self-management plans and advice from healthcare professionals were examined. Multiple regression models were used to identify behaviour associated with having a self-management plan. One-thousand seventy-eight participants (676 males, 62.7%, mean age 69.8 (standard deviation 9.0) years) were included. The majority reported taking medications as instructed (940, 94.0%) and receiving annual influenza vaccinations (962, 89.2%). Only 400 (40.4%) participants had self-management plans, 538 (49.9%) reported never having received advice on diet/exercise and 110 (42.7%) current smokers had been offered practical help to stop smoking in the previous year. General knowledge about COPD was moderate (mean total Bristol COPD Knowledge Questionnaire score: 31.5 (standard deviation 10.7); max score 65), corresponding to 48.5% of questions answered correctly. Having a self-management plan was positively associated with self-reported adherence to medication (odds ratio 3.10, 95% confidence interval 1.43 to 6.72), attendance at a training course (odds ratio 2.72, 95% confidence interval 1.81 to 4.12), attendance at a support group (odds ratio 6.28, 95% confidence interval 2.96 to 13.35) and better disease knowledge (mean difference 4.87, 95% confidence interval 3.16 to 6.58). Primary care healthcare professionals should ensure more widespread implementation of individualised self-management plans for all patients and improve the lifestyle advice provided. CALL FOR WIDER IMPLEMENTATION OF SELF-MANAGEMENT PLANS: Health professionals should ensure all patients with chronic lung disease receive individualized self-management plans and lifestyle advice. UK national guidelines state that patients with chronic obstructive pulmonary disease (COPD) should receive personalized self-management plans and comprehensive support to help them manage their disease. Ainee Khan and colleagues at the University of Birmingham analyzed patient questionnaire data gathered during the Birmingham COPD Cohort study to explore self-management behavior, receipt of self-management plans and advice, and patient knowledge of COPD. Of 1,078 participants, only 400 had self-management plans, and less than half reported receiving lifestyle advice or support. Those with plans were more likely to adhere to medication, had greater knowledge about COPD and were more likely to attend support groups and training courses. The authors recommend carefully-planned, wider implementation of COPD self-management plans and associated support.

  10. Implementation of mental health parity: lessons from california.

    PubMed

    Rosenbach, Margo L; Lake, Timothy K; Williams, Susan R; Buck, Jeffrey A

    2009-12-01

    This article reports the experiences of health plans, providers, and consumers with California's mental health parity law and discusses implications for implementation of the 2008 federal parity law. This study used a multimodal data collection approach to assess the first five years of California's parity implementation (from 2000 to 2005). Telephone interviews were conducted with 68 state-level stakeholders, and in-person interviews were conducted with 77 community-based stakeholders. Six focus groups included 52 providers, and six included 32 consumers. A semistructured interview protocol was used. Interview notes and transcripts were coded to facilitate analysis. Health plans eliminated differential benefit limits and cost-sharing requirements for certain mental disorders to comply with the law, and they used managed care to control costs. In response to concerns about access to and quality of care, the state expanded oversight of health plans, issuing access-to-care regulations and conducting focused studies. California's parity law applied to a limited list of psychiatric diagnoses. Health plan executives said they spent considerable resources clarifying which diagnoses were covered at parity levels and concluded that the limited diagnosis list was unnecessary with managed care. Providers indicated that the diagnosis list had unintended consequences, including incentives to assign a more severe diagnosis that would be covered at parity levels, rather than a less severe diagnosis that would not be covered at such levels. The lack of consumer knowledge about parity was widely acknowledged, and consumers in the focus groups requested additional information about parity. Experiences in California suggest that implementation of the 2008 federal parity law should include monitoring health plan performance related to access and quality, in addition to monitoring coverage and costs; examining the breadth of diagnoses covered by health plans; and mounting a campaign to educate consumers about their insurance benefits.

  11. SU-F-P-07: Applying Failure Modes and Effects Analysis to Treatment Planning System QA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mathew, D; Alaei, P

    2016-06-15

    Purpose: A small-scale implementation of Failure Modes and Effects Analysis (FMEA) for treatment planning system QA by utilizing methodology of AAPM TG-100 report. Methods: FMEA requires numerical values for severity (S), occurrence (O) and detectability (D) of each mode of failure. The product of these three values gives a risk priority number (RPN). We have implemented FMEA for the treatment planning system (TPS) QA for two clinics which use Pinnacle and Eclipse TPS. Quantitative monthly QA data dating back to 4 years for Pinnacle and 1 year for Eclipse have been used to determine values for severity (deviations from predeterminedmore » doses at points or volumes), and occurrence of such deviations. The TPS QA protocol includes a phantom containing solid water and lung- and bone-equivalent heterogeneities. Photon and electron plans have been evaluated in both systems. The dose values at multiple distinct points of interest (POI) within the solid water, lung, and bone-equivalent slabs, as well as mean doses to several volumes of interest (VOI), have been re-calculated monthly using the available algorithms. Results: The computed doses vary slightly month-over-month. There have been more significant deviations following software upgrades, especially if the upgrade involved re-modeling of the beams. TG-100 guidance and the data presented here suggest an occurrence (O) of 2 depending on the frequency of re-commissioning the beams, severity (S) of 3, and detectability (D) of 2, giving an RPN of 12. Conclusion: Computerized treatment planning systems could pose a risk due to dosimetric errors and suboptimal treatment plans. The FMEA analysis presented here suggests that TPS QA should immediately follow software upgrades, but does not need to be performed every month.« less

  12. Minimizing treatment planning errors in proton therapy using failure mode and effects analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zheng, Yuanshui, E-mail: yuanshui.zheng@okc.procure.com; Johnson, Randall; Larson, Gary

    Purpose: Failure mode and effects analysis (FMEA) is a widely used tool to evaluate safety or reliability in conventional photon radiation therapy. However, reports about FMEA application in proton therapy are scarce. The purpose of this study is to apply FMEA in safety improvement of proton treatment planning at their center. Methods: The authors performed an FMEA analysis of their proton therapy treatment planning process using uniform scanning proton beams. The authors identified possible failure modes in various planning processes, including image fusion, contouring, beam arrangement, dose calculation, plan export, documents, billing, and so on. For each error, the authorsmore » estimated the frequency of occurrence, the likelihood of being undetected, and the severity of the error if it went undetected and calculated the risk priority number (RPN). The FMEA results were used to design their quality management program. In addition, the authors created a database to track the identified dosimetric errors. Periodically, the authors reevaluated the risk of errors by reviewing the internal error database and improved their quality assurance program as needed. Results: In total, the authors identified over 36 possible treatment planning related failure modes and estimated the associated occurrence, detectability, and severity to calculate the overall risk priority number. Based on the FMEA, the authors implemented various safety improvement procedures into their practice, such as education, peer review, and automatic check tools. The ongoing error tracking database provided realistic data on the frequency of occurrence with which to reevaluate the RPNs for various failure modes. Conclusions: The FMEA technique provides a systematic method for identifying and evaluating potential errors in proton treatment planning before they result in an error in patient dose delivery. The application of FMEA framework and the implementation of an ongoing error tracking system at their clinic have proven to be useful in error reduction in proton treatment planning, thus improving the effectiveness and safety of proton therapy.« less

  13. Minimizing treatment planning errors in proton therapy using failure mode and effects analysis.

    PubMed

    Zheng, Yuanshui; Johnson, Randall; Larson, Gary

    2016-06-01

    Failure mode and effects analysis (FMEA) is a widely used tool to evaluate safety or reliability in conventional photon radiation therapy. However, reports about FMEA application in proton therapy are scarce. The purpose of this study is to apply FMEA in safety improvement of proton treatment planning at their center. The authors performed an FMEA analysis of their proton therapy treatment planning process using uniform scanning proton beams. The authors identified possible failure modes in various planning processes, including image fusion, contouring, beam arrangement, dose calculation, plan export, documents, billing, and so on. For each error, the authors estimated the frequency of occurrence, the likelihood of being undetected, and the severity of the error if it went undetected and calculated the risk priority number (RPN). The FMEA results were used to design their quality management program. In addition, the authors created a database to track the identified dosimetric errors. Periodically, the authors reevaluated the risk of errors by reviewing the internal error database and improved their quality assurance program as needed. In total, the authors identified over 36 possible treatment planning related failure modes and estimated the associated occurrence, detectability, and severity to calculate the overall risk priority number. Based on the FMEA, the authors implemented various safety improvement procedures into their practice, such as education, peer review, and automatic check tools. The ongoing error tracking database provided realistic data on the frequency of occurrence with which to reevaluate the RPNs for various failure modes. The FMEA technique provides a systematic method for identifying and evaluating potential errors in proton treatment planning before they result in an error in patient dose delivery. The application of FMEA framework and the implementation of an ongoing error tracking system at their clinic have proven to be useful in error reduction in proton treatment planning, thus improving the effectiveness and safety of proton therapy.

  14. Corridor Planning And Feasibility Analysis, Early Action Projects Appendix

    DOT National Transportation Integrated Search

    1994-05-01

    STUDY OBJECTIVE. BECAUSE OF THE PHYSICAL, ENVIRONMENTAL, AND TRAVEL CHARACTERISTICS OF I-70 FROM DENVER TO GLENWOOD SPRINGS, THE COLORADO DEPARTMENT OF TRANSPORTATION (CDOT) IDENTIFIED IT AS A PRIME CORRIDOR FOR IMPLEMENTING INTELLIGENT TRANSPORTATIO...

  15. 40 CFR 49.10042 - Approval status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Cow... Tribal rules or measures in the implementation plan for the Reservation of the Cow Creek Band of Umpqua...

  16. Ames Research Center FY 2000 Implementation Plan: Leading Technology into the New Millennium

    NASA Technical Reports Server (NTRS)

    2000-01-01

    This document presents the implementation plan for Ames Research Center (ARC) within the overall framework of the NASA Strategic Plan. It describes how ARC intends to implement its Center of Excellence responsibilities, Agency assigned missions, Agency and Enterprise lead programs, and other roles in support of NASA's vision and mission. All Federal agencies are required by the 1993 Government Performance and Results Act to implement a long-term strategic planning process that includes measurable outcomes and strict accountability. At NASA, this planning process is shaped by the Space Act of 1958, annual appropriations, and other external mandates, as well as by customer requirements. The resulting Strategic Plan sets the overall architecture for what we do, identifies who our customers are, and directs where we are going and why. The Strategic Plan is the basis upon which decisions regarding program implementation and resource deployment are made. Whereas the strategic planning process examines the long-term direction of the organization and identifies a specific set of goals, the implementation planning process examines the detailed performance of the organization and allocates resources toward meeting these goals. It is the purpose of this implementation document to provide the connection between the NASA Strategic Plan and the specific programs and support functions that ARC employees perform. This connection flows from the NASA Strategic Plan, through the various Strategic Enterprise plans to the ARC Center of Excellence, primary missions, Lead Center programs, program support responsibilities, and ultimately, to the role of the individual ARC employee.

  17. 77 FR 60661 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; South Bend-Elkhart...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ... Promulgation of Air Quality Implementation Plans; Indiana; South Bend-Elkhart, Indiana Ozone Maintenance Plan..., Indiana 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) by replacing the... Vehicle Emissions Simulator (MOVES) 2010a emissions model. Indiana submitted this request to EPA for...

  18. 77 FR 59356 - Approval and Promulgation of Implementation Plans; North Carolina: Approval of Rocky Mount...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-27

    ... Promulgation of Implementation Plans; North Carolina: Approval of Rocky Mount Supplemental Motor Vehicle... is proposing to approve a revision to the North Carolina State Implementation Plan (SIP), submitted... supplements the original redesignation request and maintenance plan for Rocky Mount 1997 8-hour ozone area...

  19. 77 FR 30212 - Approval and Promulgation of Air Quality Implementation Plans; Vermont; Regional Haze

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... Promulgation of Air Quality Implementation Plans; Vermont; Regional Haze AGENCY: Environmental Protection... Implementation Plan (SIP) that addresses regional haze for the first planning period from 2008 through 2018. The... numerous sources located over a wide geographic area (also referred to as the ``regional haze program...

  20. 77 FR 47530 - Approval and Promulgation of State Implementation Plans; Hawaii; Infrastructure Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... Promulgation of State Implementation Plans; Hawaii; Infrastructure Requirements for the 1997 8-Hour Ozone and... State Implementation Plan (SIP) revision submitted by the state of Hawaii pursuant to the requirements... FURTHER INFORMATION CONTACT: Dawn Richmond, Air Planning Office (AIR-2), U.S. Environmental Protection...

  1. Process evaluation of discharge planning implementation in healthcare using normalization process theory.

    PubMed

    Nordmark, Sofi; Zingmark, Karin; Lindberg, Inger

    2016-04-27

    Discharge planning is a care process that aims to secure the transfer of care for the patient at transition from home to the hospital and back home. Information exchange and collaboration between care providers are essential, but deficits are common. A wide range of initiatives to improve the discharge planning process have been developed and implemented for the past three decades. However, there are still high rates of reported medical errors and adverse events related to failures in the discharge planning. Using theoretical frameworks such as Normalization Process Theory (NPT) can support evaluations of complex interventions and processes in healthcare. The aim of this study was to explore the embedding and integration of the DPP from the perspective of registered nurses, district nurses and homecare organizers. The study design was explorative, using the NPT as a framework to explore the embedding and integration of the DPP. Data consisted of written documentation from; workshops with staff, registered adverse events and system failures, web based survey and individual interviews with staff. Using the NPT as a framework to explore the embedding and integration of discharge planning after 10 years in use showed that the staff had reached a consensus of opinion of what the process was (coherence) and how they evaluated the process (reflexive monitoring). However, they had not reached a consensus of opinion of who performed the process (cognitive participation) and how it was performed (collective action). This could be interpreted as the process had not become normalized in daily practice. The result shows necessity to observe the implementation of old practices to better understand the needs of new ones before developing and implementing new practices or supportive tools within healthcare to reach the aim of development and to accomplish sustainable implementation. The NPT offers a generalizable framework for analysis, which can explain and shape the implementation process of old practices, before further development of new practices or supportive tools.

  2. The Development of a Course in Financial Statement Analysis for the Dowling College M.B.A. Program. Curriculum and Program Planning.

    ERIC Educational Resources Information Center

    Newman, James F.

    In the development of a course in financial statement analysis, the following procedures were implemented: analysis of new accounting pronouncements, new textbooks, and articles on the topic of financial statement analysis; establishment of goals and objectives for the course; and selection of text and content of the course. The course was…

  3. The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements

    NASA Technical Reports Server (NTRS)

    Stetson, Howard; Watson, Michael D.; Shaughnessy, Ray

    2012-01-01

    In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.

  4. Social marketing and public health intervention.

    PubMed

    Lefebvre, R C; Flora, J A

    1988-01-01

    The rapid proliferation of community-based health education programs has out-paced the knowledge base of behavior change strategies that are appropriate and effective for public health interventions. However, experiences from a variety of large-scale studies suggest that principles and techniques of social marketing may help bridge this gap. This article discusses eight essential aspects of the social marketing process: the use of a consumer orientation to develop and market intervention techniques, exchange theory as a model from which to conceptualize service delivery and program participation, audience analysis and segmentation strategies, the use of formative research in program design and pretesting of intervention materials, channel analysis for devising distribution systems and promotional campaigns, employment of the "marketing mix" concept in intervention planning and implementation, development of a process tracking system, and a management process of problem analysis, planning, implementation, feedback and control functions. Attention to such variables could result in more cost-effective programs that reach larger numbers of the target audience.

  5. Transformation of the California mental health system: stakeholder-driven planning as a transformational activity.

    PubMed

    Cashin, Cheryl; Scheffler, Richard; Felton, Mistique; Adams, Neal; Miller, Leonard

    2008-10-01

    This study describes strategies developed by California counties to transform their mental health systems under the 2004 Mental Health Services Act (MHSA). This voter initiative places a 1% tax on annual incomes over $1 million; tax monies are earmarked to transform county-operated mental health services into systems that are oriented more toward recovery. MHSA implementation itself can be considered "transformational" by balancing greater standardization of mental health service delivery in the state with a locally driven planning process. A qualitative content analysis of the three-year plans submitted by 12 counties to receive funds under MHSA was conducted to identify common themes, as well as innovative approaches. These 12 (out of 58) counties were chosen to represent both small and large counties, as well as geographic diversity, and they represent 62.3% of the state population. This analysis showed that the state guidelines and local planning process generated consistency across counties in establishing full-service partnerships with a "whatever it takes" approach to providing goal-directed services and supports to consumers and their families. There was, however, little convergence around the specific strategies to achieve this vision, reflecting both the local planning process and a relative lack of clear policy and guidance on evidence-based practices. There are many obstacles to the successful implementation of these ambitious plans. However, the state-guided, but stakeholder-driven, transformation in California appears to generate innovative approaches to recovery-oriented services, involve consumers and family members in service planning and delivery, and build community partnerships that create new opportunities for consumers to meet their recovery goals.

  6. Policy Perspective: Meeting the Challenge of the DOE Order 436.1 Departmental Sustainability - 12527

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacDonald, Jennifer C.

    2012-07-01

    DOE's Sustainability Performance Office is working to meet sustainability goals at DOE by implementing Executive Orders, Departmental policy, the DOE Strategic Sustainability Performance Plan (SSPP) and legislation related to sustainability. Through implementation of Executive Orders, Departmental policy, the SSPP, statutory requirements and regular reporting, analysis and communication, DOE's SPO is working to maintain and expand DOE's leadership in sustainability. (authors)

  7. Digital Skills Development and ICT in Inclusive Education: Experiences from Cyprus Schools.

    PubMed

    Mavrou, Katerina; Loizou-Raouna, Maria

    2017-01-01

    This qualitative research has been a pilot implementation of the ENTELS self-assessment framework for schools on digital skills development and Information and Communication Technologies (ICT) in inclusive education, in Cyprus. Results suggest that participant schools overall identified themselves as "getting started" to "some progress" in all areas with the highest evaluation in the one corresponding to "school commitment in the integration of ICT skills of all students, including those with disabilities". The planned and implemented actions which followed have taken into consideration the rating of each school and the theoretical background, aimed at reinforcing the participation of the diverse students and students with disabilities and other educational needs. Final analysis of the actions' effectiveness is planned whereas future tool implementation could concentrate on how to overcome barriers and concerns related to ICT integration for promoting inclusive education.

  8. JPL Contamination Control Engineering

    NASA Technical Reports Server (NTRS)

    Blakkolb, Brian

    2013-01-01

    JPL has extensive expertise fielding contamination sensitive missions-in house and with our NASA/industry/academic partners.t Development and implementation of performance-driven cleanliness requirements for a wide range missions and payloads - UV-Vis-IR: GALEX, Dawn, Juno, WFPC-II, AIRS, TES, et al - Propulsion, thermal control, robotic sample acquisition systems. Contamination control engineering across the mission life cycle: - System and payload requirements derivation, analysis, and contamination control implementation plans - Hardware Design, Risk trades, Requirements V-V - Assembly, Integration & Test planning and implementation - Launch site operations and launch vehicle/payload integration - Flight ops center dot Personnel on staff have expertise with space materials development and flight experiments. JPL has capabilities and expertise to successfully address contamination issues presented by space and habitable environments. JPL has extensive experience fielding and managing contamination sensitive missions. Excellent working relationship with the aerospace contamination control engineering community/.

  9. Integrating mental health into chronic care in South Africa: the development of a district mental healthcare plan

    PubMed Central

    Petersen, Inge; Fairall, Lara; Bhana, Arvin; Kathree, Tasneem; Selohilwe, One; Brooke-Sumner, Carrie; Faris, Gill; Breuer, Erica; Sibanyoni, Nomvula; Lund, Crick; Patel, Vikram

    2016-01-01

    Background In South Africa, the escalating prevalence of chronic illness and its high comorbidity with mental disorders bring to the fore the need for integrating mental health into chronic care at district level. Aims To develop a district mental healthcare plan (MHCP) in South Africa that integrates mental healthcare for depression, alcohol use disorders and schizophrenia into chronic care. Method Mixed methods using a situation analysis, qualitative key informant interviews, theory of change workshops and piloting of the plan in one health facility informed the development of the MHCP. Results Collaborative care packages for the three conditions were developed to enable integration at the organisational, facility and community levels, supported by a human resource mix and implementation tools. Potential barriers to the feasibility of implementation at scale were identified. Conclusions The plan leverages resources and systems availed by the emerging chronic care service delivery platform for the integration of mental health. This strengthens the potential for future scale up. PMID:26447176

  10. Planning Targets for Phase II Watershed Implementation Plans

    EPA Pesticide Factsheets

    On August 1, 2011, EPA provided planning targets for nitrogen, phosphorus and sediment for the Phase II Watershed Implementation Plans (WIPs) of the Chesapeake Bay TMDL. This page provides the letters containing those planning targets.

  11. Progress report on a multi-service family planning mobile unit September, 1981.

    PubMed

    1981-12-01

    In 1979, the National Family Planning Program's (NFPP) multiservice mobile unit pilot project was implemented to deliver a full complement of clinical and nonclinical family planning services to remote Thai villages by transporting nurses, physicians, and supplies by van. 15 provinces with the lowest family planning achievement in 1978 were selected to participate in the project for 1 year; one refused. Funding was allocated for mobile unit trips and promotional billboards. Implementation at the time of data analysis averaged 9.8 province-months, sufficient to reveal trends in project achievement. 9579 new acceptors were reported after 805 mobile trips in the 14 provinces, an average of 12 new acceptors/trip. New acceptor recruitment costs were estimated at $6.20/client. Based on Thai data for continuation rates, an estimated 18,238 couples years of protection (CYP) were achieved by the mobile unit. In comparison to other family planning services' mobile units, the multiservice unit had the lowest operating costs, but the most expensive cost/CYP. The effectiveness of the promotional billboards was assessed by comparing acceptor rates in provinces with and without billboards. Overall, the provinces with billboards showed less of an increase in new acceptors. When months of project implementation are controlled, a positive effect of the billboards is suggested. While demonstrating that all modern contraception can be delivered via mobile units to remote villages, there is inadequate acceptance of the highly effective family planning methods to justify the cost of transporting staff and equipment.

  12. Strategic Analysis and Plan for Implementing Telemedicine at Fort Greely

    DTIC Science & Technology

    2003-03-01

    Analysis The Situational Analysis tool assessed the environmental, market , and organizational factors involved in a Fort Greely telemedicine... Factors ): Medicaid reimbursement is now approved for Alaska regardless of method of healthcare delivery. Market Factors (Customers): The influx of...arrive are Active National Guardsmen and Fort Greely Telemedicine 50 their families. Market Factors (Services): Fairbanks Memorial Hospital (FMH) can

  13. On-Line GIS Analysis and Image Processing for Geoportal Kielce/poland Development

    NASA Astrophysics Data System (ADS)

    Hejmanowska, B.; Głowienka, E.; Florek-Paszkowski, R.

    2016-06-01

    GIS databases are widely available on the Internet, but mainly for visualization with limited functionality; very simple queries are possible i.e. attribute query, coordinate readout, line and area measurements or pathfinder. A little more complex analysis (i.e. buffering or intersection) are rare offered. Paper aims at the concept of Geoportal functionality development in the field of GIS analysis. Multi-Criteria Evaluation (MCE) is planned to be implemented in web application. OGC Service is used for data acquisition from the server and results visualization. Advanced GIS analysis is planned in PostGIS and Python programming. In the paper an example of MCE analysis basing on Geoportal Kielce is presented. Other field where Geoportal can be developed is implementation of processing new available satellite images free of charge (Sentinel-2, Landsat 8, ASTER, WV-2). Now we are witnessing a revolution in access to the satellite imagery without charge. This should result in an increase of interest in the use of these data in various fields by a larger number of users, not necessarily specialists in remote sensing. Therefore, it seems reasonable to expand the functionality of Internet's tools for data processing by non-specialists, by automating data collection and prepared predefined analysis.

  14. Marine spatial planning in practice

    NASA Astrophysics Data System (ADS)

    Collie, Jeremy S.; (Vic) Adamowicz, W. L.; Beck, Michael W.; Craig, Bethany; Essington, Timothy E.; Fluharty, David; Rice, Jake; Sanchirico, James N.

    2013-01-01

    Multiple competing uses of continental-shelf environments have led to a proliferation of marine spatial planning initiatives, together with expert guidance on marine spatial planning. This study provides an empirical review of marine spatial plans, their attributes, and the extent to which the expert guidance is actually being followed. We performed a structured review of 16 existing marine spatial plans and created an idealized marine spatial plan from the steps included in recent expert papers. A cluster analysis of the yes/no answers to 28 questions was used to ordinate the 16 marine spatial plans and to compare them with the idealized plan. All the plans that have been implemented have a high-level government mandate and the authority to implement spatial planning vested in existing institutions. Almost all the plans used data with clear criteria for data inclusion. Stakeholders were included in almost all the plans; they did not participate in all stages of the planning process but their roles were generally clearly defined. Decision-support tools were applied inconsistently across plans and were seldom used dynamically over time. Most spatial planning processes did not select specific outcomes, such as preferred use scenarios. Success is defined inconsistently across plans; in half the cases there are no metrics of success with reference benchmarks. Although monitoring is included in the majority of plans, only in some cases do monitoring results feed back into management decisions. The process of marine spatial planning had advanced in that some of the more recent plans were developed more quickly and contain more desirable attributes than earlier plans. Even so, existing marine spatial plans are heterogeneous—there are essential ingredients, but no single recipe for success.

  15. Investigating and Learning Lessons from Early Experiences of Implementing ePrescribing Systems into NHS Hospitals: A Questionnaire Study

    PubMed Central

    Cresswell, Kathrin; Coleman, Jamie; Slee, Ann; Williams, Robin; Sheikh, Aziz

    2013-01-01

    Background ePrescribing systems have significant potential to improve the safety and efficiency of healthcare, but they need to be carefully selected and implemented to maximise benefits. Implementations in English hospitals are in the early stages and there is a lack of standards guiding the procurement, functional specifications, and expected benefits. We sought to provide an updated overview of the current picture in relation to implementation of ePrescribing systems, explore existing strategies, and identify early lessons learned. Methods A descriptive questionnaire-based study, which included closed and free text questions and involved both quantitative and qualitative analysis of the data generated. Results We obtained responses from 85 of 108 NHS staff (78.7% response rate). At least 6% (n = 10) of the 168 English NHS Trusts have already implemented ePrescribing systems, 2% (n = 4) have no plans of implementing, and 34% (n = 55) are planning to implement with intended rapid implementation timelines driven by high expectations surrounding improved safety and efficiency of care. The majority are unclear as to which system to choose, but integration with existing systems and sophisticated decision support functionality are important decisive factors. Participants highlighted the need for increased guidance in relation to implementation strategy, system choice and standards, as well as the need for top-level management support to adequately resource the project. Although some early benefits were reported by hospitals that had already implemented, the hoped for benefits relating to improved efficiency and cost-savings remain elusive due to a lack of system maturity. Conclusions Whilst few have begun implementation, there is considerable interest in ePrescribing systems with ambitious timelines amongst those hospitals that are planning implementations. In order to ensure maximum chances of realising benefits, there is a need for increased guidance in relation to implementation strategy, system choice and standards, as well as increased financial resources to fund local activities. PMID:23335961

  16. Mission analysis of photovoltaic solar energy systems. Quarterly progress report, 1 March 1976-31 May 1976

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leonard, S.L.; Munjal, P.K.; Rattin, E.J.

    1976-06-01

    The main emphasis of the activity during the second quarter of this project continued to be on Task 1, Analysis of Near-Term Missions, and on Task 2, Analysis of Major Mid-Term Missions. In addition, considerable progress was also made on Task 6, Comparison of the True Societal Costs of Conventional and Photovoltaic Power Production, and starts were made on Task 3, Review and Updating of the ERDA Technology Implementation Plan, and Task 4, Critical External Issues. As was planned, work on Task 5, Impact of Incentives, was deferred to the second half of the program. Progress is reported. (WHK)

  17. Building robust conservation plans.

    PubMed

    Visconti, Piero; Joppa, Lucas

    2015-04-01

    Systematic conservation planning optimizes trade-offs between biodiversity conservation and human activities by accounting for socioeconomic costs while aiming to achieve prescribed conservation objectives. However, the most cost-efficient conservation plan can be very dissimilar to any other plan achieving the set of conservation objectives. This is problematic under conditions of implementation uncertainty (e.g., if all or part of the plan becomes unattainable). We determined through simulations of parallel implementation of conservation plans and habitat loss the conditions under which optimal plans have limited chances of implementation and where implementation attempts would fail to meet objectives. We then devised a new, flexible method for identifying conservation priorities and scheduling conservation actions. This method entails generating a number of alternative plans, calculating the similarity in site composition among all plans, and selecting the plan with the highest density of neighboring plans in similarity space. We compared our method with the classic method that maximizes cost efficiency with synthetic and real data sets. When implementation was uncertain--a common reality--our method provided higher likelihood of achieving conservation targets. We found that χ, a measure of the shortfall in objectives achieved by a conservation plan if the plan could not be implemented entirely, was the main factor determining the relative performance of a flexibility enhanced approach to conservation prioritization. Our findings should help planning authorities prioritize conservation efforts in the face of uncertainty about future condition and availability of sites. © 2014 Society for Conservation Biology.

  18. 76 FR 15 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-03

    ... Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking and Trading... hard copy at the Air Planning Section (6PD-L), Environmental Protection Agency, 1445 Ross Avenue, Suite...

  19. 78 FR 33784 - Approval and Promulgation of Implementation Plans; Kentucky: Kentucky Portion of Cincinnati...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-05

    ... Promulgation of Implementation Plans; Kentucky: Kentucky Portion of Cincinnati-Hamilton, Supplement Motor.... SUMMARY: EPA is proposing to approve a revision to the Kentucky State Implementation Plan (SIP), submitted... maintenance plan for the Kentucky portion of the Cincinnati-Hamilton, OH-KY-IN, maintenance area for the 1997...

  20. 78 FR 34903 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; 1997 8-Hour Ozone...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Promulgation of Air Quality Implementation Plans; Ohio; 1997 8-Hour Ozone Maintenance Plan Revision; Motor... request by Ohio to revise the 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) to... area with budgets developed using EPA's Motor Vehicle Emissions Simulator (MOVES) emissions model. Ohio...

  1. 78 FR 16826 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Cleveland-Akron-Lorain and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-19

    ...-9790-1] Approval and Promulgation of Air Quality Implementation Plans; Ohio; Cleveland-Akron-Lorain and Columbus 1997 8-Hour Ozone Maintenance Plan Revisions to Approved Motor Vehicle Emissions Budgets AGENCY... quality State Implementation Plans (SIPs) under the Clean Air Act to replace the previously approved motor...

  2. 78 FR 28497 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Canton-Massillon 1997 8-Hour...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... Promulgation of Air Quality Implementation Plans; Ohio; Canton-Massillon 1997 8-Hour Ozone Maintenance Plan... the Canton-Massillon, Ohio 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP... using EPA's Motor Vehicle Emissions Simulator (MOVES) emissions model. Ohio submitted the SIP revision...

  3. 78 FR 28551 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Canton-Massillon 1997 8-Hour...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... Promulgation of Air Quality Implementation Plans; Ohio; Canton-Massillon 1997 8-Hour Ozone Maintenance Plan..., Ohio, 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) under the Clean Air Act... Motor Vehicle Emissions Simulator (MOVES) emissions model. Ohio submitted the SIP revision request to...

  4. 77 FR 30214 - Approval and Promulgation of Air Quality Implementation Plans; Rhode Island; Regional Haze

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... Promulgation of Air Quality Implementation Plans; Rhode Island; Regional Haze AGENCY: Environmental Protection... Implementation Plan (SIP) that addresses regional haze for the first planning period from 2008 through 2018. The... geographic area (also referred to as the ``regional haze program''). DATES: Effective Date: This rule is...

  5. 76 FR 43149 - Approval and Promulgation of Air Quality Implementation Plans; State of California; Regional Haze...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0131, FRL-9317-9] Approval and Promulgation of Air Quality Implementation Plans; State of California; Regional Haze State Implementation Plan and Interstate Transport Plan; Interference With Visibility Requirement Correction In rule document...

  6. 76 FR 57013 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Revised Motor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... Promulgation of Air Quality Implementation Plans; West Virginia; Revised Motor Vehicle Emission Budgets for the... Implementation Plan (SIP) revision submitted by the State of West Virginia for the purpose of amending the 8-hour ozone maintenance plan for the Charleston, Huntington, Parkersburg, Weirton, and Wheeling 8-hour ozone...

  7. 77 FR 56555 - Approval and Promulgation of Implementation Plans; State of Missouri; Maximum Allowable Emission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... emissions impact of the clean fuels exclusion, MDNR relied on a technical analysis of emissions from units..., correspondence, referenced above, also included a technical analysis demonstrating that the averaging approach... EPA cannot read your comment due to technical difficulties and cannot contact you for clarification...

  8. 77 FR 38509 - Approval and Promulgation of Implementation Plans; South Carolina; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... Carolina's 2018 projections are based on the State's technical analysis of the anticipated emissions rates... haze technical analyses was developed by the Visibility Improvement State and Tribal Association of the... appropriate documentation in its SIP of the technical analysis it used to assess the need for and...

  9. 77 FR 14712 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts; Determination of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... Massachusetts Department of Environmental Protection performed a missing data analysis for each site with low... Massachusetts missing data analysis used a combination of meteorology and air quality data for ozone monitors... with missing ozone data, the ozone levels, if captured, would have been below the 1997 8-hour ozone...

  10. 77 FR 21896 - Approval and Promulgation of Air Quality Implementation Plans; State of Nevada; Regional Haze...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-12

    ... proposed approval, including specific comments on NDEP's modeling and cost analysis of the RGGS BART Determination for NO X . See Modeling for the Reid Gardner Generating Station: Visibility Impacts in Class I... independent modeling analysis to evaluate the incremental visibility improvement attributable to the NO X...

  11. Bangladesh policy on prevention and control of non-communicable diseases: a policy analysis.

    PubMed

    Biswas, Tuhin; Pervin, Sonia; Tanim, Md Imtiaz Alam; Niessen, Louis; Islam, Anwar

    2017-06-19

    This paper is aimed at critically assessing the extent to which Non-Communicable Disease NCD-related policies introduced in Bangladesh align with the World Health Organization's (WHO) 2013-2020 Action Plan for the Global Strategy for the Prevention and Control of NCDs. The authors reviewed all relevant policy documents introduced by the Government of Bangladesh since its independence in 1971. The literature review targeted scientific and grey literature documents involving internet-based search, and expert consultation and snowballing to identify relevant policy documents. Information was extracted from the documents using a specific matrix, mapping each document against the six objectives of the WHO 2013-2020 Action Plan for the Global Strategy for the Prevention and Control of NCDs. A total of 51 documents were identified. Seven (14%) were research and/or surveys, nine were on established policies (17%), while seventeen (33%) were on action programmes. Five (10%) were related to guidelines and thirteen (25%) were strategic planning documents from government and non-government agencies/institutes. The study covered documents produced by the Government of Bangladesh as well as those by quasi-government and non-government organizations irrespective of the extent to which the intended policies were implemented. The policy analysis findings suggest that although the government has initiated many NCD-related policies or programs, they lacked proper planning, implementation and monitoring. Consequently, Bangladesh over the years had little success in effectively addressing the growing burden of non-communicable diseases. It is imperative that future research critically assess the effectiveness of national NCD policies by monitoring their implementation and level of population coverage.

  12. Regional Traffic Incident Management Programs : Implementation Guide

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Air Quality Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM projects ...

  13. Application of demographic analysis to pedestrian safety : [project summary].

    DOT National Transportation Integrated Search

    2017-05-01

    FDOT has been working diligently to improve its facilities for pedestrians and cyclists, including : initiatives like the Complete Streets Policy and Implementation Plan. However, one of the : challenges facing FDOT is targeting those areas of greate...

  14. Implementation plan and cost analysis for Oregon's online crash reporting system.

    DOT National Transportation Integrated Search

    2011-07-01

    Federal, state and local transportation agencies, law enforcement, the legislature, consulting firms, safety advocates and the : public use crash data to quantify emerging traffic safety issues and problems, determine priorities, support decision-mak...

  15. Joint Robotics Program

    DTIC Science & Technology

    2008-04-23

    Kotler , P.M. (1997). Marketing management: Analysis, planning, implementation, and control. Upper Saddle River, NJ: Prentice Hall...needed to provide needed items. Production needed to be stable so suppliers could more easily meet demand ( Kotler , 1997, pp. 214-215). The Robotics

  16. Implementing AORN recommended practices for product selection.

    PubMed

    Conrardy, Julie A

    2012-06-01

    This article focuses on the revised AORN "Recommended practices for product selection in perioperative practice settings." Hospitals and ambulatory surgery facilities should have protocols in place for product evaluation that includes a multidisciplinary team approach. The process for product evaluation and selection includes gathering information; establishing consistent requirements for product evaluation; performing a financial impact analysis; investigating a plan to standardize products; conducting an environmental impact analysis; determining whether to purchase single-use, reposable, or reusable products or reprocess single-use devices; developing an evaluation process based on objective criteria; and developing and implementing a comprehensive plan to introduce and use new products. Use of an evaluation tool that is based on objective criteria is one way to obtain valuable input during product evaluations. Because of varied roles and experiences, the perioperative RN is an integral member of the product selection committee. Published by Elsevier Inc.

  17. Performance validation of the ANSER control laws for the F-18 HARV

    NASA Technical Reports Server (NTRS)

    Messina, Michael D.

    1995-01-01

    The ANSER control laws were implemented in Ada by NASA Dryden for flight test on the High Alpha Research Vehicle (HARV). The Ada implementation was tested in the hardware-in-the-loop (HIL) simulation, and results were compared to those obtained with the NASA Langley batch Fortran implementation of the control laws which are considered the 'truth model.' This report documents the performance validation test results between these implementations. This report contains the ANSER performance validation test plan, HIL versus batch time-history comparisons, simulation scripts used to generate checkcases, and detailed analysis of discrepancies discovered during testing.

  18. Performance validation of the ANSER Control Laws for the F-18 HARV

    NASA Technical Reports Server (NTRS)

    Messina, Michael D.

    1995-01-01

    The ANSER control laws were implemented in Ada by NASA Dryden for flight test on the High Alpha Research Vehicle (HARV). The Ada implementation was tested in the hardware-in-the-loop (HIL) simulation, and results were compared to those obtained with the NASA Langley batch Fortran implementation of the control laws which are considered the 'truth model'. This report documents the performance validation test results between these implementations. This report contains the ANSER performance validation test plan, HIL versus batch time-history comparisons, simulation scripts used to generate checkcases, and detailed analysis of discrepancies discovered during testing.

  19. 40 CFR 109.5 - Development and implementation criteria for State, local and regional oil removal contingency plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OIL REMOVAL CONTINGENCY PLANS § 109.5 Development and implementation criteria for State, local and regional oil removal contingency plans. Criteria for the development and implementation of State, local and... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Development and implementation...

  20. 77 FR 65125 - Approval and Promulgation of Implementation Plans; Georgia 110(a)(1) and (2) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... controls are enforced through the associated SIP rules or Federal Implementation Plans (FIPs). Any purchase... Promulgation of Implementation Plans; Georgia 110(a)(1) and (2) Infrastructure Requirements for the 1997 and... Agency (EPA). ACTION: Final rule. SUMMARY: EPA is taking final action to approve the State Implementation...

  1. Implementing corporate wellness programs: a business approach to program planning.

    PubMed

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  2. Watershed-scale evaluation of Humboldt Redwood Company’s Habitat Conservation Plan timber harvest best management practices, Railroad Gulch, Elk River, California

    Treesearch

    Andrew Stubblefield; Shane Beach; Nicolas M. Harrison; Michelle Haskins

    2017-01-01

    The objective of this study is to test the effectiveness of California Forest Practice Rules and additional best management practices implemented as part of Humboldt Redwood Company’s Habitat Conservation Plan and Watershed Analysis prescriptions, in limiting the delivery of management-derived sediment. A paired watershed study format is being utilized to...

  3. Extended-Release Naltrexone: A Qualitative Analysis of Barriers to Routine Use.

    PubMed

    Alanis-Hirsch, Kelly; Croff, Raina; Ford, James H; Johnson, Kim; Chalk, Mady; Schmidt, Laura; McCarty, Dennis

    2016-03-01

    The Medication Research Partnership (a national health plan and nine addiction treatment centers contracted with the health plan) sought to facilitate the adoption of pharmacotherapy for alcohol and opioid use disorders. Qualitative analysis of interviews with treatment center change leaders, individuals working for the manufacturer and its technical assistance contractor, and health plan managers extracted details on the processes used to order, store, bill for, and administer extended-release naltrexone. Qualitative themes were categorized using domains from the Consolidated Framework for Implementation Research (intervention characteristics, outer setting, inner setting, and provider characteristics). Characteristics of XR-NTX that inhibited use included the complexity of ordering and using the medication; cost was also a barrier. Outer setting barriers reflected patient needs and external health plan policies on formulary coverage, benefit management, and reimbursement. Program structures, the lack of physician linkages, a culture resistant to the use of medication, and unease with change were inner setting elements that limited use of XR-NTX. Patient stereotypes and a lack of knowledge about XR-NTX affected practitioner willingness to treat patients and prescribe XR-NTX. The Consolidated Framework for Implementation Research provided a useful lens to understand and interpret the processes affecting access to XR-NTX. Copyright © 2015 Elsevier Inc. All rights reserved.

  4. The implementation of two stages clustering (k-means clustering and adaptive neuro fuzzy inference system) for prediction of medicine need based on medical data

    NASA Astrophysics Data System (ADS)

    Husein, A. M.; Harahap, M.; Aisyah, S.; Purba, W.; Muhazir, A.

    2018-03-01

    Medication planning aim to get types, amount of medicine according to needs, and avoid the emptiness medicine based on patterns of disease. In making the medicine planning is still rely on ability and leadership experience, this is due to take a long time, skill, difficult to obtain a definite disease data, need a good record keeping and reporting, and the dependence of the budget resulted in planning is not going well, and lead to frequent lack and excess of medicines. In this research, we propose Adaptive Neuro Fuzzy Inference System (ANFIS) method to predict medication needs in 2016 and 2017 based on medical data in 2015 and 2016 from two source of hospital. The framework of analysis using two approaches. The first phase is implementing ANFIS to a data source, while the second approach we keep using ANFIS, but after the process of clustering from K-Means algorithm, both approaches are calculated values of Root Mean Square Error (RMSE) for training and testing. From the testing result, the proposed method with better prediction rates based on the evaluation analysis of quantitative and qualitative compared with existing systems, however the implementation of K-Means Algorithm against ANFIS have an effect on the timing of the training process and provide a classification accuracy significantly better without clustering.

  5. Understanding key factors affecting electronic medical record implementation: a sociotechnical approach.

    PubMed

    Cucciniello, Maria; Lapsley, Irvine; Nasi, Greta; Pagliari, Claudia

    2015-07-17

    Recent health care policies have supported the adoption of Information and Communication Technologies (ICT) but examples of failed ICT projects in this sector have highlighted the need for a greater understanding of the processes used to implement such innovations in complex organizations. This study examined the interaction of sociological and technological factors in the implementation of an Electronic Medical Record (EMR) system by a major national hospital. It aimed to obtain insights for managers planning such projects in the future and to examine the usefulness of Actor Network Theory (ANT) as a research tool in this context. Case study using documentary analysis, interviews and observations. Qualitative thematic analysis drawing on ANT. Qualitative analyses revealed a complex network of interactions between organizational stakeholders and technology that helped to shape the system and influence its acceptance and adoption. The EMR clearly emerged as a central 'actor' within this network. The results illustrate how important it is to plan innovative and complex information systems with reference to (i) the expressed needs and involvement of different actors, starting from the initial introductory phase; (ii) promoting commitment to the system and adopting a participative approach; (iii) defining and resourcing new roles within the organization capable of supporting and sustaining the change and (iv) assessing system impacts in order to mobilize the network around a common goal. The paper highlights the organizational, cultural, technological, and financial considerations that should be taken into account when planning strategies for the implementation of EMR systems in hospital settings. It also demonstrates how ANT may be usefully deployed in evaluating such projects.

  6. Harmonization of European laboratory response networks by implementing CWA 15793: use of a gap analysis and an "insider" exercise as tools.

    PubMed

    Sundqvist, Bo; Bengtsson, Ulrika Allard; Wisselink, Henk J; Peeters, Ben P H; van Rotterdam, Bart; Kampert, Evelien; Bereczky, Sándor; Johan Olsson, N G; Szekely Björndal, Asa; Zini, Sylvie; Allix, Sébastien; Knutsson, Rickard

    2013-09-01

    Laboratory response networks (LRNs) have been established for security reasons in several countries including the Netherlands, France, and Sweden. LRNs function in these countries as a preparedness measure for a coordinated diagnostic response capability in case of a bioterrorism incident or other biocrimes. Generally, these LRNs are organized on a national level. The EU project AniBioThreat has identified the need for an integrated European LRN to strengthen preparedness against animal bioterrorism. One task of the AniBioThreat project is to suggest a plan to implement laboratory biorisk management CWA 15793:2011 (CWA 15793), a management system built on the principle of continual improvement through the Plan-Do-Check-Act (PDCA) cycle. The implementation of CWA 15793 can facilitate trust and credibility in a future European LRN and is an assurance that the work done at the laboratories is performed in a structured way with continuous improvements. As a first step, a gap analysis was performed to establish the current compliance status of biosafety and laboratory biosecurity management with CWA 15793 in 5 AniBioThreat partner institutes in France (ANSES), the Netherlands (CVI and RIVM), and Sweden (SMI and SVA). All 5 partners are national and/or international laboratory reference institutes in the field of public or animal health and possess high-containment laboratories and animal facilities. The gap analysis showed that the participating institutes already have robust biorisk management programs in place, but several gaps were identified that need to be addressed. Despite differences between the participating institutes in their compliance status, these variations are not significant. Biorisk management exercises also have been identified as a useful tool to control compliance status and thereby implementation of CWA 15793. An exercise concerning an insider threat and loss of a biological agent was performed at SVA in the AniBioThreat project to evaluate implementation of the contingency plans and as an activity in the implementation process of CWA 15793. The outcome of the exercise was perceived as very useful, and improvements to enhance biorisk preparedness were identified. Gap analyses and exercises are important, useful activities to facilitate implementation of CWA 15793. The PDCA cycle will enforce a structured way to work, with continual improvements concerning biorisk management activities. Based on the activities in the AniBioThreat project, the following requirements are suggested to promote implementation: support from the top management of the organizations, knowledge about CWA 15793, a compliance audit checklist and gap analysis, training and exercises, networking in LRNs and other networks, and interinstitutional audits. Implementation of CWA 15793 at each institute would strengthen the European animal bioterrorism response capabilities by establishing a well-prepared LRN.

  7. 40 CFR 49.10050 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10050 Federally... part of the implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians: (a...

  8. The effectiveness of national strategic guidelines at a local level: a case study of the UK general aviation industry

    NASA Astrophysics Data System (ADS)

    Lober, Terence

    The thesis is concerned with the prospects for reducing strategic-local tensions in the British planning process. It examines the conflicts surrounding small general aviation aerodromes as a means of understanding these tensions, why they have evolved, and if they might be reconciled through planning reform. The only prior academic research to have touched upon this issue through general aviation has been an ESRC funded project undertaken by Gallent and colleagues (1999), who found aerodromes provided a microcosm of planning's issues. Building on this work, the thesis develops what is meant by strategic-local tensions, which in broad terms are described as differences between national and regional guidance/plans and what actually takes place locally. Moving from a basic research question it develops a wide planning perspective based on the literature by discussing the meaning of planning, its history and issues for example, how conflicts in planning might be influenced by the broader socio-political environment. The thesis then arrives at three hypotheses which question the effectiveness of the existing strategic guideline implementation process, develops a local planning authority framework and addresses issues of reflectivity and bias. Results from three national surveys of pilots, aerodromes and manufacturers, plus longitudinal analysis of government and other datasets, are then used to detail a comprehensive and unique description of general aviation, which includes a costing based account of the direct expenditure of flying activity. This provides a substantive foundation for a local planning authority survey which both extends previous boundaries and enables the process of implementing strategic objectives to be disaggregated and evaluated. Field visits to twenty six aerodromes and five local authorities are subsequently used to explore gaps within the strategic implementation process and to develop conclusions, within the wider landscape of planning, about the nature of strategic local tensions and implications for planning reform.

  9. Efficiency in Rule- vs. Plan-Based Movements Is Modulated by Action-Mode.

    PubMed

    Scheib, Jean P P; Stoll, Sarah; Thürmer, J Lukas; Randerath, Jennifer

    2018-01-01

    The rule/plan motor cognition (RPMC) paradigm elicits visually indistinguishable motor outputs, resulting from either plan- or rule-based action-selection, using a combination of essentially interchangeable stimuli. Previous implementations of the RPMC paradigm have used pantomimed movements to compare plan- vs. rule-based action-selection. In the present work we attempt to determine the generalizability of previous RPMC findings to real object interaction by use of a grasp-to-rotate task. In the plan task, participants had to use prospective planning to achieve a comfortable post-handle rotation hand posture. The rule task used implementation intentions (if-then rules) leading to the same comfortable end-state. In Experiment A, we compare RPMC performance of 16 healthy participants in pantomime and real object conditions of the experiment, within-subjects. Higher processing efficiency of rule- vs. plan-based action-selection was supported by diffusion model analysis. Results show a significant response-time increase in the pantomime condition compared to the real object condition and a greater response-time advantage of rule-based vs. plan-based actions in the pantomime compared to the real object condition. In Experiment B, 24 healthy participants performed the real object RPMC task in a task switching vs. a blocked condition. Results indicate that plan-based action-selection leads to longer response-times and less efficient information processing than rule-based action-selection in line with previous RPMC findings derived from the pantomime action-mode. Particularly in the task switching mode, responses were faster in the rule compared to the plan task suggesting a modulating influence of cognitive load. Overall, results suggest an advantage of rule-based action-selection over plan-based action-selection; whereby differential mechanisms appear to be involved depending on the action-mode. We propose that cognitive load is a factor that modulates the advantageous effect of implementation intentions in motor cognition on different levels as illustrated by the varying speed advantages and the variation in diffusion parameters per action-mode or condition, respectively.

  10. The implementation of health promotion in primary and community care: a qualitative analysis of the 'Prescribe Vida Saludable' strategy.

    PubMed

    Martinez, Catalina; Bacigalupe, Gonzalo; Cortada, Josep M; Grandes, Gonzalo; Sanchez, Alvaro; Pombo, Haizea; Bully, Paola

    2017-02-17

    The impact of lifestyle on health is undeniable and effective healthy lifestyle promotion interventions do exist. However, this is not a fundamental part of routine primary care clinical practice. We describe factors that determine changes in performance of primary health care centers involved in piloting the health promotion innovation 'Prescribe Vida Saludable' (PVS) phase II. We engaged four primary health care centers of the Basque Healthcare Service in an action research project aimed at changing preventive health practices. Prescribe Healthy Life (PVS from the Spanish "Prescribe Vida Saludable) is focused on designing, planning, implementing and evaluating innovative programs to promote multiple healthy habits, feasible to be performed in routine primary health care conditions. After 2 years of piloting, centers were categorized as having high, medium, or low implementation effectiveness. We completed qualitative inductive and deductive analysis of five focus groups with the staff of the centers. Themes generated through consensual grounded qualitative analysis were compared between centers to identify the dimensions that explain the variation in actual implementation of PVS, and retrospectively organized and assessed against the Consolidated Framework for Implementation Research (CFIR). Of the 36 CFIR constructs, 11 were directly related to the level of implementation performance: intervention source, evidence strength and quality, adaptability, design quality and packaging, tension for change, learning climate, self-efficacy, planning, champions, executing, and reflecting and evaluating, with -organizational tracking added as a new sub-construct. Additionally, another seven constructs emerged in the participants' discourse but were not related to center performance: relative advantage, complexity, patients' needs and resources, external policy and incentives, structural characteristics, available resources, and formally appointed internal implementation leaders. Our findings indicate that the success of the implementation seems to be associated with the following components: the context, the implementation process, and the collaborative modelling. Identifying barriers and enablers is useful for designing implementation strategies for health promotion in primary health care centers that are essential for innovation success. An implementation model is proposed to highlight the relationships between the CFIR constructs in the context of health promotion in primary care.

  11. 78 FR 34965 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Lima 1997 8-Hour Ozone...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Promulgation of Air Quality Implementation Plans; Ohio; Lima 1997 8-Hour Ozone Maintenance Plan Revision; Motor... 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) to replace the previously... Simulator (MOVES) emissions model. Ohio submitted the SIP revision request to EPA on January 11, 2013. DATES...

  12. 78 FR 34965 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; 1997 8-Hour Ozone...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Promulgation of Air Quality Implementation Plans; Ohio; 1997 8-Hour Ozone Maintenance Plan Revision; Motor... request by Ohio to revise the 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP...) emissions model. Ohio submitted the SIP revision request to EPA on December 7, 2012. DATES: Comments must be...

  13. 78 FR 34906 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Lima 1997 8-Hour Ozone...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Promulgation of Air Quality Implementation Plans; Ohio; Lima 1997 8-Hour Ozone Maintenance Plan Revision to... Lima, Ohio 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) to replace motor... (MOVES) emissions model. Ohio submitted the SIP revision request to EPA on January 11, 2013. DATES: This...

  14. Strategies to overcome barriers to implementing osteoporosis and fracture prevention guidelines in long-term care: a qualitative analysis of action plans suggested by front line staff in Ontario, Canada.

    PubMed

    Alamri, Sultan H; Kennedy, Courtney C; Marr, Sharon; Lohfeld, Lynne; Skidmore, Carly J; Papaioannou, Alexandra

    2015-08-01

    Osteoporosis is a major global health problem, especially among long-term care (LTC) facilities. Despite the availability of effective clinical guidelines to prevent osteoporosis and bone fractures, few LTC homes actually adhere to these practical recommendations. The purpose of this study was to identify barriers to the implementation of evidence-based practices for osteoporosis and fracture prevention in LTC facilities and elicit practical strategies to address these barriers. We performed a qualitative analysis of action plans formulated by Professional Advisory Committee (PAC) teams at 12 LTC homes in the intervention arm of the Vitamin D and Osteoporosis Study (ViDOS) in Ontario, Canada. PAC teams were comprised of medical directors, administrators, directors of care, pharmacists, dietitians, and other staff. Thematic content analysis was performed to identify the key themes emerging from the action plans. LTC teams identified several barriers, including lack of educational information and resources prior to the ViDOS intervention, difficulty obtaining required patient information for fracture risk assessment, and inconsistent prescribing of vitamin D and calcium at the time of admission. The most frequently suggested recommendations was to establish and adhere to standard admission orders regarding vitamin D, calcium, and osteoporosis therapies, improve the use of electronic medical records for osteoporosis and fracture risk assessment, and require bone health as a topic at quarterly reviews and multidisciplinary conferences. This qualitative study identified several important barriers and practical recommendations for improving the implementation of osteoporosis and fracture prevention guidelines in LTC settings.

  15. Factors affecting strategic plan implementation using interpretive structural modeling (ISM).

    PubMed

    Bahadori, Mohammadkarim; Teymourzadeh, Ehsan; Tajik, Hamidreza; Ravangard, Ramin; Raadabadi, Mehdi; Hosseini, Seyed Mojtaba

    2018-06-11

    Purpose Strategic planning is the best tool for managers seeking an informed presence and participation in the market without surrendering to changes. Strategic planning enables managers to achieve their organizational goals and objectives. Hospital goals, such as improving service quality and increasing patient satisfaction cannot be achieved if agreed strategies are not implemented. The purpose of this paper is to investigate the factors affecting strategic plan implementation in one teaching hospital using interpretive structural modeling (ISM). Design/methodology/approach The authors used a descriptive study involving experts and senior managers; 16 were selected as the study sample using a purposive sampling method. Data were collected using a questionnaire designed and prepared based on previous studies. Data were analyzed using ISM. Findings Five main factors affected strategic plan implementation. Although all five variables and factors are top level, "senior manager awareness and participation in the strategic planning process" and "creating and maintaining team participation in the strategic planning process" had maximum drive power. "Organizational structure effects on the strategic planning process" and "Organizational culture effects on the strategic planning process" had maximum dependence power. Practical implications Identifying factors affecting strategic plan implementation is a basis for healthcare quality improvement by analyzing the relationship among factors and overcoming the barriers. Originality/value The authors used ISM to analyze the relationship between factors affecting strategic plan implementation.

  16. Measuring the Implementation Fidelity of Student Affairs Programs: A Critical Component of the Outcomes Assessment Cycle

    ERIC Educational Resources Information Center

    Gerstner, Jerusha J.; Finney, Sara J.

    2013-01-01

    Implementation fidelity assessment provides a means of measuring the alignment between the planned program and the implemented program. Unfortunately, the implemented program can differ from the planned program, resulting in ambiguous inferences about the planned program's effectiveness (i.e., it is uncertain if poor results are due to an…

  17. 75 FR 10449 - Approval and Promulgation of Implementation Plans; Texas; Revisions to Chapter 116 Which Relate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-08

    ... Promulgation of Implementation Plans; Texas; Revisions to Chapter 116 Which Relate to the Application Review... approve revisions to the Texas State Implementation Plan (SIP) submitted by the State of Texas to EPA on... implements the requirements of House Bill 3732, 80th Legislature (2007), and the Texas Health and Safety Code...

  18. Strategic Plan. Volume 1

    NASA Technical Reports Server (NTRS)

    2002-01-01

    The purpose of this document is to present the strategic plan and associated organizational structure that the National Space Biomedical Research Institute (NSBRI) will utilize to achieve the defined mission and objectives provided by NASA. Much of the information regarding the background and establishment of the NSBRI by NASA has been provided in other documentation and will not be repeated in this Strategic Plan. This Strategic Plan is presented in two volumes. Volume I (this volume) begins with an Introduction (Section 2) that provides the Institute's NASA-defined mission and objectives, and the organizational structure adopted to implement these through three Strategic Programs: Countermeasure Research; Education, Training and Outreach; and Cooperative Research and Development. These programs are described in Sections 3 to 5. Each program is presented in a similar way, using four subsections: Goals and Objectives; Current Strategies; Gaps and Modifications; and Resource Requirements. Section 6 provides the administrative infrastructure and total budget required to implement the Strategic Programs and assures that they form a single cohesive plan. This plan will ensure continued success of the Institute for the next five years. Volume II of the Strategic Plan provides an in-depth analysis of the current and future strategic programs of the 12 current NSBRI teams, including their goals, objectives, mutual interactions and schedules.

  19. [Situational profile and intervention strategy in the Mesoamerican region in maternal, neonatal and reproductive health area].

    PubMed

    Hernández-Prado, Bernardo; Kestler, Edgar; Díaz, Juan; Walker, Dilys; Langer, Ana; Lewis, Sarah; De la Vara-Salazar, Elvia; Melo-Zurita, María del Carmen; Iriarte, Emma; Danel, Isabella; Donnay, France; Alemán, Denis; Serrano, Roselyn; Morales, Evelyn; Largaespada, Natalia; González, José Douglas Jarquín; Hernández, Ma Del Carmen; Mejía, Claudia E Quiroz; González, Geneva; Carrera, Yadira; Valverde, Clelia; Luna, Rufino; Valencia-Mendoza, Atanacio; Sosa-Rubí, Sandra G; Hernández-Prado, Bernardo; Kestler, Edgar; Díaz, Juan; Walker, Dilys; Langer, Ana; Lewis, Sarah; De la Vara-Salazar, Elvia; Melo-Zurita, María Del Carmen

    2011-01-01

    To present the main results of the regional situation diagnosis and intervention plan developed in 2010 as part of the planning activities of the Mesoamerican Health System by the Working Group on Maternal, Reproductive and Neonatal Health. A group of experts and representatives from countries in the region (Central America and nine southern Mexican states) conducted an exhaustive review of available data to construct a situational analysis and a review of effective practices for improving maternal, reproductive and neonatal health. Finally, the group proposed a regional action plan, defining regional goals and specific interventions. The situational diagnosis suggests that, although there has been progress in the last 10 years, maternal and neonatal mortality rates are still unnaceptably high in the region, with a substantial variability across countries. The group proposed as a regional goal the reduction of maternal and neonatal mortality in accordance with the Millenium Development Goals. The regional plan recommends specific maternal and neonatal health interventions emphasizing obstetric and neonatal emergency care, skilled birth attendance and family planning. The plan also includes a five year implementation strategy, along with training and evaluation strategies. The regional plan for maternal, neonatal and reproductive health has the potential to be successful, provided it is effectively implemented.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meetingmore » held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.« less

  1. BNSF San Bernardino case study : positive train control risk assessment.

    DOT National Transportation Integrated Search

    2014-09-01

    The Federal Railroad Administration funded the BNSF San Bernardino Case Study to verify its Generalized Train Movement : Simulator (GTMS) risk assessment capabilities on a planned implementation of the I-ETMS PTC system. The analysis explicitly : sim...

  2. SUSTAIN - A BMP Process and Placement Tool for Urban Watersheds (Poster)

    EPA Science Inventory

    To assist stormwater management professionals in planning for best management practices (BMPs) and low-impact developments (LIDs) implementation, USEPA is developing a decision support system, called the System for Urban Stormwater Treatment and Analysis INtegration (SUSTAIN). ...

  3. 77 FR 66638 - The Standard on Process Safety Management of Highly Hazardous Chemicals; Extension of the Office...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... analyses and the development of other elements of the standard; developing a written action plan for..., revalidating and retaining the process hazard analysis; developing and implementing written operating [[Page 66639

  4. Documentation Supplement for Base Case v4.10_FTransport - Updates for Final Transport Rule

    EPA Pesticide Factsheets

    View the document that describes the changes implemented as a result for the Final Cross-State Air Pollution Rule (Transport Rule) analysis in EPA’s application of the Integrated Planning Model (IPM).

  5. Standby Conservation Plan No. 3: Emergency advertising lighting restrictions. Economic analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report analyzes the potential economic impacts of the Emergency Advertising Lighting Restrictions Plan. The on-premise signs located within the confines of a business and off-premise located outside the confines of a business are affected. Illuminated signs essential to direct customers to an open business by identifying it and/or to inform customers of a product or service supplied by the open business are not restricted. The economic impact of implementing this plan is evaluated by first estimating the amount of petroleum saved by the lighting restrictions and to evaluate the economic impacts that would result. The amount of oil thatmore » could be diverted to other uses by implementation of this plan is estimated in Chapter 2, and amounts to about 4,000 barrels per day (the period analyzed is the fourth quarter of 1980 through the third quarter of 1981). Redistribution of petroleum saved by this measure is expected to result in small increases in GNP, personal consumption, and employment. The effects on inflation are negligible. Economic impacts for the businesses are evaluated in Chapter 3. Costs of implementing the measure are estimated to be about $3.1 million, including the cost of reimbursing the states for functions delegated to them. (MCW)« less

  6. Monitoring implementation of desertification combating plan using geomatics - A case study, districts Dhar and Jhabua, Madhya Pradesh

    NASA Astrophysics Data System (ADS)

    Arunima, Dasgupta; Dhinwa, P. S.; Rajawat, A. S.

    2015-02-01

    The world's drylands are subject to desertification as a result of extended droughts, climate change, and human activities. Development in drylands depends on addressing degradation of the ecosystem, mainstreaming sustainable natural resources management, and building upon the existing adaptive capacities of communities and institutions. In this regard, recent scientific results aimed to promote sustainable development through action plans for combating desertification. In India, under the Integrated Mission for Sustainable Development (IMSD) programme, remote sensing based integrated land and water resource studies were carried out with an objective to generate locale specific action plans for sustainable development of a region. A specific study was carried out, in districts of Jhabua and Dhar, in Madhya Pradesh using Composite Land Development Sites (CLDS) approach for forest and wasteland development and soil and water conservation. Various treatments were suggested and implemented in 1995. The present study was carried out with an objective to monitor the positive impacts of combating plan implementation through visual interpretation and NDVI analysis of temporal images of LISS III data, since 1991 to 2013. The study reveals that there is substantial increase in the area of irrigated agricultural land with increase in number of check dams along with the stream channels.

  7. Two implementations of the Expert System for the Flight Analysis System (ESFAS) project

    NASA Technical Reports Server (NTRS)

    Wang, Lui

    1988-01-01

    A comparison is made between the two most sophisticated expert system building tools, the Automated Reasoning Tool (ART) and the Knowledge Engineering Environment (KEE). The same problem domain (ESFAS) was used in making the comparison. The Expert System for the Flight Analysis System (ESFAS) acts as an intelligent front end for the Flight Analysis System (FAS). FAS is a complex configuration controlled set of interrelated processors (FORTRAN routines) which will be used by the Mission Planning and Analysis Div. (MPAD) to design and analyze Shuttle and potential Space Station missions. Implementations of ESFAS are described. The two versions represent very different programming paradigms; ART uses rules and KEE uses objects. Due to each of the tools philosophical differences, KEE is implemented using a depth first traversal algorithm, whereas ART uses a user directed traversal method. Either tool could be used to solve this particular problem.

  8. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... URBAN DEVELOPMENT COMMUNITY FACILITIES URBAN EMPOWERMENT ZONES: ROUND TWO AND THREE DESIGNATIONS Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an... requirements that the state and local governments, as Empowerment Zone designees, have agreed to meet as...

  9. An assessment of implementation and evaluation phases of strategic plans in Iranian hospitals.

    PubMed

    Sadeghifar, Jamil; Tofighi, Shahram; Roshani, Mohamad; Toulideh, Zahra; Mohsenpour, Seyedramezan; Jafari, Mehdi

    2017-01-01

    To assess the implementation and evaluation phases of strategic plans in selected hospitals. We conducted a cross-sectional study of implementation and evaluation of strategic plan in 24 hospitals in 2015, using a questionnaire which consisted of two separate sections for strategic implementation and strategic evaluation. Data were analyzed with SPSS version 18. Nearly one-third of hospitals claimed that they allocate their budget based on priorities and strategic goals. However, it turned out that although goals had been set, no formal announcements had been made. Most of the hospitals stated that they used measures when evaluating the plan. For hospital staff, clarifying the hospital's priorities was the most important advantage of a strategic plan. There is no clear definition for strategic management in Iranian hospitals, which results in chaotic implementation and control of strategic planning.

  10. Effects of Iranian Economic Reforms on Equity in Social and Healthcare Financing: A Segmented Regression Analysis.

    PubMed

    Zandian, Hamed; Takian, Amirhossein; Rashidian, Arash; Bayati, Mohsen; Zahirian Moghadam, Telma; Rezaei, Satar; Olyaeemanesh, Alireza

    2018-03-01

    One of the main objectives of the Targeted Subsidies Law (TSL) in Iran was to improve equity in healthcare financing. This study aimed at measuring the effects of the TSL, which was implemented in Iran in 2010, on equity in healthcare financing. Segmented regression analysis was applied to assess the effects of TSL implementation on the Gini and Kakwani indices of outcome variables in Iranian households. Data for the years 1977-2014 were retrieved from formal databases. Changes in the levels and trends of the outcome variables before and after TSL implementation were assessed using Stata version 13. In the 33 years before the implementation of the TSL, the Gini index decreased from 0.401 to 0.381. The Gini index and its intercept significantly decreased to 0.362 (p<0.001) 5 years after the implementation of the TSL. There was no statistically significant change in the gross domestic product or inflation rate after TSL implementation. The Kakwani index significantly increased from -0.020 to 0.007 (p<0.001) before the implementation of the TSL, while we observed no statistically significant change (p=0.81) in the Kakwani index after TSL implementation. The TSL reform, which was introduced as part of an economic development plan in Iran in 2010, led to a significant reduction in households' income inequality. However, the TSL did not significantly affect equity in healthcare financing. Hence, while measuring the long-term impact of TSL is paramount, healthcare decision-makers need to consider the efficacy of the TSL in order to develop plans for achieving the desired equity in healthcare financing.

  11. Effects of Iranian Economic Reforms on Equity in Social and Healthcare Financing: A Segmented Regression Analysis

    PubMed Central

    Bayati, Mohsen

    2018-01-01

    Objectives One of the main objectives of the Targeted Subsidies Law (TSL) in Iran was to improve equity in healthcare financing. This study aimed at measuring the effects of the TSL, which was implemented in Iran in 2010, on equity in healthcare financing. Methods Segmented regression analysis was applied to assess the effects of TSL implementation on the Gini and Kakwani indices of outcome variables in Iranian households. Data for the years 1977-2014 were retrieved from formal databases. Changes in the levels and trends of the outcome variables before and after TSL implementation were assessed using Stata version 13. Results In the 33 years before the implementation of the TSL, the Gini index decreased from 0.401 to 0.381. The Gini index and its intercept significantly decreased to 0.362 (p<0.001) 5 years after the implementation of the TSL. There was no statistically significant change in the gross domestic product or inflation rate after TSL implementation. The Kakwani index significantly increased from -0.020 to 0.007 (p<0.001) before the implementation of the TSL, while we observed no statistically significant change (p=0.81) in the Kakwani index after TSL implementation. Conclusions The TSL reform, which was introduced as part of an economic development plan in Iran in 2010, led to a significant reduction in households’ income inequality. However, the TSL did not significantly affect equity in healthcare financing. Hence, while measuring the long-term impact of TSL is paramount, healthcare decision-makers need to consider the efficacy of the TSL in order to develop plans for achieving the desired equity in healthcare financing. PMID:29631352

  12. Meta-analysis of learning design on sciences to develop a teacher’s professionalism training model

    NASA Astrophysics Data System (ADS)

    Alimah, S.; Anggraito, Y. U.; Prasetyo, A. P. B.; Saptono, S.

    2018-03-01

    This research explored a meta-analysis ofthe teaching design on sciences teachers’ lesson plans to develop the training model in achieving 21st-century learning competence and the implementation of the scientifically literate school model. This is a qualitative research with descriptively qualitative analysis. The sample was the members of sciences teacher’s organizations in Brebes Central Java Indonesia. Data was collected by documentation, observation, interviews, and questionnaires scale understanding. Analysis of the lesson plans focused on the correctness of development concept and integration of Strengthening Character Education; School Literacy Movement; Communication, Collaboration, Critical Thinking and Creativity; and Higher Order Thinking Skill. The sciences teachers had a good understanding of the components of the lesson plan, but needed further training. The integration of the character education by the teacher was not explicitly written into their lesson plan. The teachers’ skill to integrate the components was still needed improvements. It is found that training and mentoring of lesson plan development to improve the skills of science teachers in achieving 21st-century learning competencies are still urgent to be done. The training and mentoring model proposed here is Peretipe model, to help teachers skillfully design good lesson plans based on Technological Pedagogical, and Content Knowledge.

  13. Integrated Processing in Planning and Understanding.

    DTIC Science & Technology

    1986-12-01

    to language analysis seemed necessary. The second observation was the rather commonsense one that it is easier to understand a foreign language ...syntactic analysis Probably the most widely employed method for natural language analysis is augmea ted transition network parsing, or ATNs (Thorne, Bratley...accomplished. It is for this reason that the programming language Prolog, which implements that general method , has proven so well-stilted to writing ATN

  14. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    ERIC Educational Resources Information Center

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  15. Implementation of Recommendations from the One System Comparative Evaluation of the Hanford Tank Farms and Waste Treatment Plant Safety Bases

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garrett, Richard L.; Niemi, Belinda J.; Paik, Ingle K.

    2013-11-07

    A Comparative Evaluation was conducted for One System Integrated Project Team to compare the safety bases for the Hanford Waste Treatment and Immobilization Plant Project (WTP) and Tank Operations Contract (TOC) (i.e., Tank Farms) by an Expert Review Team. The evaluation had an overarching purpose to facilitate effective integration between WTP and TOC safety bases. It was to provide One System management with an objective evaluation of identified differences in safety basis process requirements, guidance, direction, procedures, and products (including safety controls, key safety basis inputs and assumptions, and consequence calculation methodologies) between WTP and TOC. The evaluation identified 25more » recommendations (Opportunities for Integration). The resolution of these recommendations resulted in 16 implementation plans. The completion of these implementation plans will help ensure consistent safety bases for WTP and TOC along with consistent safety basis processes. procedures, and analyses. and should increase the likelihood of a successful startup of the WTP. This early integration will result in long-term cost savings and significant operational improvements. In addition, the implementation plans lead to the development of eight new safety analysis methodologies that can be used at other U.S. Department of Energy (US DOE) complex sites where URS Corporation is involved.« less

  16. Implementation Issues for Departure Planning Systems

    NASA Technical Reports Server (NTRS)

    Hansman, R. John; Feron, Eric; Clarke, John-Paul; Odoni, Amedeo

    1999-01-01

    The objective of the proposed effort is to investigate issues associated with the design and implementation of decision aiding tools to assist in improving the departure process at congested airports. This effort follows a preliminary investigation of potential Departure Planning approaches and strategies, which identified potential benefits in departure efficiency, and also in reducing the environmental impact of aircraft in the departure queue. The preliminary study bas based, in large part, on observations and analysis of departure processes at Boston, Logan airport. The objective of this follow-on effort is to address key implementation issues and to expand the observational base to include airports with different constraints and traffic demand. Specifically, the objectives of this research are to: (1) Expand the observational base to include airports with different underlying operational dynamics. (2) Develop prototype decision aiding algorithms/approaches and assess potential benefits. and (3) Investigate Human Machine Integration (HMI) issues associated with decision aids in tower environments.

  17. Sample-Based Motion Planning in High-Dimensional and Differentially-Constrained Systems

    DTIC Science & Technology

    2010-02-01

    Reachable Set . . . 88 6-1 LittleDog Robot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94 6-2 Dog bounding up stairs ...planning algorithm implemented on LittleDog, a quadruped robot . The motion planning algorithm successfully planned bounding trajectories over extremely...a motion planning algorithm implemented on LittleDog, a quadruped robot . The motion planning algorithm successfully planned bounding trajectories

  18. Strategic planning, implementation, and evaluation processes in hospital systems: a survey from Iran.

    PubMed

    Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza

    2014-09-28

    Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. All the investigated hospitals had a strategic plan. The obtained percentages for the items "the rate of the compliance to requirements" and "the quantity of planning facilitators" (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved.

  19. Strategic Planning, Implementation, and Evaluation Processes in Hospital Systems: A Survey From Iran

    PubMed Central

    Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza

    2015-01-01

    Aim & Background: Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. Methods: The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. Results: All the investigated hospitals had a strategic plan. The obtained percentages for the items “the rate of the compliance to requirements” and “the quantity of planning facilitators” (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). Conclusion: According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved. PMID:25716385

  20. Gender Analysis in Agriculture in Luribay Valley, Bolivia.

    ERIC Educational Resources Information Center

    Garcia-Pabon, Jose Luis

    A study focused on gender issues in Luribay, an isolated Andean region that shelters small, resource-limited farmers in the province of La Paz, Bolivia. Gender analysis was used as a tool for the planning and implementation of development programs. The research was carried out during June, July, and August 1993. A literature review focused on…

  1. 78 FR 15664 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Interstate Transport...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-12

    ... technical analysis supporting New Mexico's conclusion as recommended by EPA's guidance memorandum that... modeling technical analyses are available, but EPA does not believe that modeling is necessarily required...)(2)(D)(i)(I) for the 2006 PM 2.5 NAAQS in several ways. It takes into account the technical analysis...

  2. 75 FR 69002 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-10

    ...: Our proposed action (75 FR 27976) and the associated TSD (pages 2-3) both refer to two ICAPCD analyses... specifically references page 15 of Environ's ``Draft Final Technical Memorandum Regulation VIII BACM Analysis... reference CARB's inventory analysis to support the 50% reduction assumption. \\1\\ Printed in error as III-2...

  3. An Analysis of Evaluation Plans in a Federally Funded Leadership Preparation Program: Implications for the Improvement of Practice

    ERIC Educational Resources Information Center

    Sanzo, Karen L.

    2012-01-01

    This study is a content analysis of selected federally funded leadership preparation program evaluation proposals for the 2008, 2009, and 2010 School Leadership Program grants. The United States Department of Education (USDE) began awarding funding in 2002 to develop and implement preparation programs for aspiring and current assistant principals…

  4. 77 FR 24845 - Approval and Promulgation of Implementation Plans; South Dakota; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... various pollution controls in its BART analysis for Big Stone I, its cost impact analysis is skewed in... took into account the State's consideration of environmental impacts when reviewing the Big Stone I SO... shutdown are part of normal operations at facilities like Big Stone, and because these emissions impact...

  5. Effectiveness of the Wraparound Process for Children with Emotional and Behavioral Disorders: A Meta-Analysis

    ERIC Educational Resources Information Center

    Suter, Jesse C.; Bruns, Eric J.

    2009-01-01

    Wraparound is a team-based service planning and coordination process intended to improve outcomes for children and youth with serious emotional and behavioral disorders and support them in their homes, schools, and communities. Given the substantial resources devoted to implementing wraparound, a meta-analysis of outcome studies was conducted to…

  6. 75 FR 66699 - Lacey Act Implementation Plan; Definitions for Exempt and Regulated Articles

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    .../component/main?main=DocketDetail&d=APHIS-2009-0018 to submit or view comments and to view supporting and... comment to Docket No. APHIS-2009-0018, Regulatory Analysis and Development, PPD, APHIS, Station 3A-03.8... Policy Analysis and Support, PPQ, APHIS, 4700 River Road Unit 60, Riverdale, MD 20737-1231; (301) 734...

  7. 77 FR 3220 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts; Determination of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-23

    ... of Environmental Protection performed a missing data analysis for this site in accordance with the regulatory requirements of 40 CFR part 50, Appendix I. The Massachusetts missing data analysis used a combination of meteorology and air quality data for ozone monitors near the Adams site for the missing days to...

  8. 3 CFR 13501 - Executive Order 13501 of February 6, 2009. Establishment of the President's Economic Recovery...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., nonpartisan information, analysis, and advice to the President as he formulates and implements his plans for...) provide analysis and information with respect to the operation, regulation, and healthy functioning of the...: (a) solicit information and ideas from across the country and from all sectors of our economy about...

  9. 75 FR 61369 - Revisions to the California State Implementation Plan; Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... the California State Implementation Plan; Sacramento Metropolitan Air Quality Management District... approve a revision to the Sacramento Metropolitan Air Quality Management District's portion of the... Metropolitan Air Quality Management District (SMAQMD) adopted the ``Ozone State Implementation Plan Revision...

  10. 76 FR 48006 - Limited Federal Implementation Plan; Prevention of Significant Deterioration; California; North...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-08

    ... Implementation Plan; Prevention of Significant Deterioration; California; North Coast Unified Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing a limited Federal Implementation Plan (FIP) for the North Coast Unified Air Quality Management...

  11. 76 FR 34630 - Approval and Promulgation of Implementation Plans; New Hampshire: Prevention of Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... Promulgation of Implementation Plans; New Hampshire: Prevention of Significant Deterioration; Greenhouse Gas... greenhouse gas (GHG) emissions. This rule clarifies the applicable thresholds in the New Hampshire SIP... Significant Deterioration Provisions Concerning Greenhouse Gas Emitting-Sources in State Implementation Plans...

  12. 75 FR 2090 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Volatile Organic Compound...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... Promulgation of Air Quality Implementation Plans; Indiana; Volatile Organic Compound Automobile Refinishing... automobile refinishing rule for approval into its State Implementation Plan (SIP). These rule revisions extend the applicability of Indiana's approved volatile organic compound (VOC) automobile refinishing...

  13. Climate Action Planning Process | Climate Neutral Research Campuses | NREL

    Science.gov Websites

    Action Planning Process Climate Action Planning Process For research campuses, NREL has developed a five-step process to develop and implement climate action plans: Determine baseline energy consumption Analyze technology options Prepare a plan and set priorities Implement the climate action plan Measure and

  14. A Business Case Framework for Planning Clinical Nurse Specialist-Led Interventions.

    PubMed

    Bartlett Ellis, Rebecca J; Embree, Jennifer L; Ellis, Kurt G

    2015-01-01

    The purpose of this article is to describe a business case framework that can guide clinical nurse specialists (CNS) in clinical intervention development. Increased emphasis on cost-effective interventions in healthcare requires skills in analyzing the need to make the business case, especially for resource-intensive interventions. This framework assists the CNS to anticipate resource use and then consider if the intervention makes good business sense. We describe a business case framework that can assist the CNS to fully explore the problem and determine if developing an intervention is a good investment. We describe several analyses that facilitate making the business case to include the following: problem identification and alignment with strategic priorities, needs assessment, stakeholder analysis, market analysis, intervention implementation planning, financial analysis, and outcome evaluation. The findings from these analyses can be used to develop a formal proposal to present to hospital leaders in a position to make decisions. By aligning intervention planning with organizational priorities and engaging patients in the process, interventions will be more likely to be implemented in practice and produce robust outcomes. The business case framework can be used to justify to organization decision makers the need to invest resources in new interventions that will make a difference for quality outcomes as well as the financial bottom line. This framework can be used to plan interventions that align with organizational strategic priorities, plan for associated costs and benefits, and outcome evaluation. Clinical nurse specialists are well positioned to lead clinical intervention projects that will improve the quality of patient care and be cost-effective. To do so requires skill development in making the business case.

  15. State Wildlife Action Plans as Tools for Adapting to a Continuously Changing Climate

    NASA Astrophysics Data System (ADS)

    Metivier, D. W.; Yocum, H.; Ray, A. J.

    2015-12-01

    Public land management plans are potentially powerful policies for building sustainability and adaptive capacity. Land managers are recognizing the need to respond to numerous climate change impacts on natural and human systems. For the first time, in 2015, the federal government required each state to incorporate climate change into their State Wildlife Action Plans (SWAP) as a condition for funding. As important land management tools, SWAPs have the potential to guide state agencies in shaping and implementing practices for climate change adaptation. Intended to be revised every ten years, SWAPs can change as conditions and understanding of climate change evolves. This study asks what practices are states using to integrate climate change, and how does this vary between states? To answer this question, we conducted a broad analysis among seven states (CO, MT, NE, ND, SD, UT, WY) and a more in-depth analysis of four states (CO, ND, SD, WY). We use seven key factors that represent best practices for incorporating climate change identified in the literature. These best practices are species prioritization, key habitats, threats, monitoring, partnerships and participation, identification of management options, and implementation of management options. The in-depth analysis focuses on how states are using climate change information for specific habitats addressed in the plans. We find that states are integrating climate change in many different ways, showing varying degrees of sophistication and preparedness. We summarize different practices and highlight opportunities to improve the effectiveness of plans through: communication tools across state lines and stakeholders, explicit targeting of key habitats, enforcement and monitoring progress and success, and conducting vulnerability analyses that incorporate topics beyond climate and include other drivers, trajectories, and implications of historic and future land-use change.

  16. Some Methods for Evaluating Program Implementation.

    ERIC Educational Resources Information Center

    Hardy, Roy A.

    An approach to evaluating program implementation is described. This approach includes the development of a project description which includes a structure matrix, sampling from the structure matrix, and preparing an implementation evaluation plan. The implementation evaluation plan should include: (1) verification of implementation of planned…

  17. Prototyping a bedside documentation system.

    PubMed

    Bachand, P; Bobis, K

    1993-01-01

    The implementation of a comprehensive bedside documentation system is a major project that demands careful analysis and planning. Since the cost of a typical bedside system can easily exceed $3 million, a design oversight could have disastrous effects on the benefits of the system.

  18. [The improvement of manpower support of municipal hospitals].

    PubMed

    Plutnitskiy, A N

    2013-01-01

    The article demonstrates the importance of analysis of improvement of implementation of manpower support of municipal hospitals in the framework of development of planning their activities. The optimal identification of demand in manpower and other types of resources is considered.

  19. Satellite services system analysis study. Volume 2, part 2: Study results

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The development of an effective satellite services system was investigated. Satek Satellite user market, design reference missions, satellite service functions, service equipment, and cost estimates are discussed. Extensive program plans for a satellite service system implementation are included.

  20. Evaluation of data requirements for computerized constructability analysis of pavement rehabilitation projects.

    DOT National Transportation Integrated Search

    2013-08-01

    This research aimed to evaluate the data requirements for computer assisted construction planning : and staging methods that can be implemented in pavement rehabilitation projects in the state of : Georgia. Results showed that two main issues for the...

  1. Three-dimensional modeling of flexible pavements : research implementation plan.

    DOT National Transportation Integrated Search

    2006-02-14

    Many of the asphalt pavement analysis programs are based on linear elastic models. A linear viscoelastic models : would be superior to linear elastic models for analyzing the response of asphalt concrete pavements to loads. There : is a need to devel...

  2. Marketing Human Resource Development.

    ERIC Educational Resources Information Center

    Frank, Eric, Ed.

    1994-01-01

    Describes three human resource development activities: training, education, and development. Explains marketing from the practitioners's viewpoint in terms of customer orientation; external and internal marketing; and market analysis, research, strategy, and mix. Shows how to design, develop, and implement strategic marketing plans and identify…

  3. Creative Survival in Educational Bureaucracies.

    ERIC Educational Resources Information Center

    Brubaker, Dale L.; Nelson, Roland H., Jr.

    In order to survive creativity in and change educational organizations, the decision-maker needs to understand how these organizations presently function. Educational organizations are discussed as sociopolitical systems and a conceptual framework is proposed for analysis, planning, implementation, and evaluation. The five functions that…

  4. An empirical analysis of strategy implementation process and performance of construction companies

    NASA Astrophysics Data System (ADS)

    Zaidi, F. I.; Zawawi, E. M. A.; Nordin, R. M.; Ahnuar, E. M.

    2018-02-01

    Strategy implementation is known as action stage where it is to be considered as the most difficult stage in strategic planning. Strategy implementation can influence the whole texture of a company including its performance. The aim of this research is to provide the empirical relationship between strategy implementation process and performance of construction companies. This research establishes the strategy implementation process and how it influences the performance of construction companies. This research used quantitative method approached via questionnaire survey. Respondents were G7 construction companies in Klang Valley, Selangor. Pearson correlation analysis indicate a strong positive relationship between strategy implementation process and construction companies’ performance. The most importance part of strategy implementation process is to provide sufficient training for employees which directly influence the construction companies’ profit growth and employees’ growth. This research results will benefit top management in the construction companies to conduct strategy implementation in their companies. This research may not reflect the whole construction industry in Malaysia. Future research may be resumed to small and medium grades contractors and perhaps in other areas in Malaysia.

  5. 78 FR 16825 - Approval of Air Quality Implementation Plans; Navajo Nation; Regional Haze Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-19

    ... Quality Implementation Plans; Navajo Nation; Regional Haze Requirements for Navajo Generating Station... source-specific federal implementation plan (FIP) requiring the Navajo Generating Station (NGS), located... . SUPPLEMENTARY INFORMATION: Throughout this document, ``we'', ``us'', and ``our'' refer to EPA. Table of Contents...

  6. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Master Implementation Sequencing... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... of Environmental Protection, and other Federal, State, and local agencies, develop a Master...

  7. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Master Implementation Sequencing... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... of Environmental Protection, and other Federal, State, and local agencies, develop a Master...

  8. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Master Implementation Sequencing... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... of Environmental Protection, and other Federal, State, and local agencies, develop a Master...

  9. 78 FR 52485 - Revisions to the Arizona State Implementation Plan, Maricopa County Area

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-23

    ...] Revisions to the Arizona State Implementation Plan, Maricopa County Area AGENCY: Environmental Protection... County Area portion of the Arizona State Implementation Plan (SIP). These revisions concern particulate matter (PM) emissions from fugitive dust sources. We are approving local statutes that regulate these...

  10. 78 FR 63383 - Approval and Promulgation of Air Quality Implementation Plans; Rhode Island: Prevention of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ...] Approval and Promulgation of Air Quality Implementation Plans; Rhode Island: Prevention of Significant... revisions to the Rhode Island State Implementation Plan (SIP) primarily relating to regulation of Greenhouse Gases (GHGs) under Rhode Island's Prevention of Significant Deterioration (PSD) preconstruction...

  11. 76 FR 4835 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Volatile Organic Compound...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... Promulgation of Air Quality Implementation Plans; Ohio; Volatile Organic Compound Reinforced Plastics...) emissions from reinforced plastic composites production operations to Ohio's State Implementation plan (SIP). This rule applies to any facility that has reinforced plastic composites production operations. This...

  12. 75 FR 24404 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Volatile Organic Compound...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... Promulgation of Air Quality Implementation Plans; Indiana; Volatile Organic Compound Automobile Refinishing... approving into the Indiana State Implementation Plan (SIP) amendments to Indiana's automobile refinishing... (VOC) automobile refinishing rules to all persons in Indiana who sell or manufacture automobile...

  13. 77 FR 24160 - Revisions to the Hawaii State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... the Hawaii State Implementation Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Hawaii State Implementation Plan (SIP... Hawaii SIP in 1983. DATES: Any comments on this proposal must arrive by May 23, 2012. ADDRESSES: Submit...

  14. 76 FR 5203 - Draft Environmental Impact Statement, Stehekin River Corridor Implementation Plan, North Cascades...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... Statement, Stehekin River Corridor Implementation Plan, North Cascades National Park Service Complex; Chelan... public comment period. SUMMARY: The National Park Service, in cooperation with the Federal Highway Administration, has prepared a combined Stehekin River Corridor Implementation Plan, Lake Chelan National...

  15. 75 FR 34669 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... Promulgation of Air Quality Implementation Plans; Maryland; Transportation Conformity Regulations AGENCY... Implementation Plan (SIP) revision submitted by Maryland for Transportation Conformity Regulations. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final...

  16. 76 FR 59344 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-26

    ... Promulgation of Air Quality Implementation Plans; Maryland; Transportation Conformity Regulations AGENCY... Implementation Plan (SIP) revision submitted by Maryland to establish transportation conformity regulations. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a...

  17. 40 CFR 93.120 - Consequences of control strategy implementation plan failures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Consequences of control strategy implementation plan failures. 93.120 Section 93.120 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Consequences of control strategy implementation plan failures. (a) Disapprovals. (1) If EPA disapproves any...

  18. 76 FR 53369 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Adhesives and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-26

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Adhesives and Sealants Rule AGENCY... Implementation Plan (SIP) revision submitted by the Commonwealth of Pennsylvania. The SIP revision pertains to... volatile organic compounds (VOC) from the manufacture, sale, use, or application of adhesives, sealants...

  19. Assessing the main threats to marine ecosystem components of the Adriatic - Ionian Region for the implementation of Maritime Spatial Planning

    NASA Astrophysics Data System (ADS)

    Lipizer, Marina

    2015-04-01

    Marine and coastal ecosystems and the related benefits they provide for humans are threatened by increasing pressures and competing usages. To address these issues, in the last decade, several EU legislations have been formulated to guarantee and promote sustainable use of the sea (e.g. Common Fishery Policy, Marine Strategy Framework Directive, Maritime Spatial Planning). As a first step to implement cross-border Maritime Spatial Planning (MSP) in the Adriatic - Ionian Seas, a review of the main anthropogenic pressures due to maritime activities involving the Adriatic - Ionian Region (AIR) as well as of the most relevant environmental components has been carried out. The main objective of the analysis is to better identify the spatial distribution of human uses of the sea and of the key environmental components and the ecosystem services provided. The analysis of the existing conditions includes a description of the human activities per economic sector, considering type, location, dimension and magnitude of the activity in the AIR and the spatial extent of the main environmental and ecological values present in the AIR. The environmental status has been characterized according to the descriptors proposed by the Marine Strategy Framework Directive (MSFD Directive 2008/56/EC) and the most sensitive ecosystem components in the AIR have been pointed out. A qualitative analysis of the relationships between good environmental status descriptors sensu MSFD and ecosystem services in the AIR has been carried out to provide useful information for the implementation of MSP. Cross-border Maritime Spatial Planning is particularly needed in a semi-enclosed basin such as the Adriatic Sea, hosting very diverse human activities, ranging from fishery to tourism, sand extraction, commercial and passenger transport, oil and gas exploration and exploitation, which may partially overlap and severely threaten ecosystem functioning and the associated services.

  20. An assessment of implementation and evaluation phases of strategic plans in Iranian hospitals

    PubMed Central

    Sadeghifar, Jamil; Tofighi, Shahram; Roshani, Mohamad; Toulideh, Zahra; Mohsenpour, Seyedramezan; Jafari, Mehdi

    2017-01-01

    Objectives: To assess the implementation and evaluation phases of strategic plans in selected hospitals. Methods: We conducted a cross-sectional study of implementation and evaluation of strategic plan in 24 hospitals in 2015, using a questionnaire which consisted of two separate sections for strategic implementation and strategic evaluation. Data were analyzed with SPSS version 18. Results: Nearly one-third of hospitals claimed that they allocate their budget based on priorities and strategic goals. However, it turned out that although goals had been set, no formal announcements had been made. Most of the hospitals stated that they used measures when evaluating the plan. For hospital staff, clarifying the hospital’s priorities was the most important advantage of a strategic plan. Conclusion: There is no clear definition for strategic management in Iranian hospitals, which results in chaotic implementation and control of strategic planning. PMID:29085637

  1. 40 CFR 49.148-49.150 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions Federal Implementation Plan for Oil and Natural Gas Production Facilities, Fort Berthold Indian...

  2. 40 CFR 49.148-49.150 - [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions Federal Implementation Plan for Oil and Natural Gas Production Facilities, Fort Berthold Indian...

  3. Failure mode analysis to predict product reliability.

    NASA Technical Reports Server (NTRS)

    Zemanick, P. P.

    1972-01-01

    The failure mode analysis (FMA) is described as a design tool to predict and improve product reliability. The objectives of the failure mode analysis are presented as they influence component design, configuration selection, the product test program, the quality assurance plan, and engineering analysis priorities. The detailed mechanics of performing a failure mode analysis are discussed, including one suggested format. Some practical difficulties of implementation are indicated, drawn from experience with preparing FMAs on the nuclear rocket engine program.

  4. 40 CFR 52.2673 - Original identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Guam § 52.2673 Original identification of plan. (a) This section identified the original “Implementation Plan for Compliance With the...

  5. 40 CFR 52.2823 - Original identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) American Samoa § 52.2823 Original identification of plan. (a) This section identified the original “Implementation Plan for Compliance With the...

  6. SWOT analysis for safer carriage of bulk liquid chemicals in tankers.

    PubMed

    Arslan, Ozcan; Er, Ismail Deha

    2008-06-15

    The application of strengths, weaknesses, opportunities and threats (SWOT) analysis to formulation of strategy concerned with the safe carriage of bulk liquid chemicals in maritime tankers was examined in this study. A qualitative investigation using SWOT analysis has been implemented successfully for ships that are designed to carry liquid chemicals in bulk. The originality of this study lies in the use of SWOT analysis as a management tool to formulate strategic action plans for ship management companies, ship masters and officers for the carriage of dangerous goods in bulk. With this transportation-based SWOT analysis, efforts were made to explore the ways and means of converting possible threats into opportunities, and changing weaknesses into strengths; and strategic plans of action were developed for safer tanker operation.

  7. GIS-assisted spatial analysis for urban regulatory detailed planning: designer's dimension in the Chinese code system

    NASA Astrophysics Data System (ADS)

    Yu, Yang; Zeng, Zheng

    2009-10-01

    By discussing the causes behind the high amendments ratio in the implementation of urban regulatory detailed plans in China despite its law-ensured status, the study aims to reconcile conflict between the legal authority of regulatory detailed planning and the insufficient scientific support in its decision-making and compilation by introducing into the process spatial analysis based on GIS technology and 3D modeling thus present a more scientific and flexible approach to regulatory detailed planning in China. The study first points out that the current compilation process of urban regulatory detailed plan in China employs mainly an empirical approach which renders it constantly subjected to amendments; the study then discusses the need and current utilization of GIS in the Chinese system and proposes the framework of a GIS-assisted 3D spatial analysis process from the designer's perspective which can be regarded as an alternating processes between the descriptive codes and physical design in the compilation of regulatory detailed planning. With a case study of the processes and results from the application of the framework, the paper concludes that the proposed framework can be an effective instrument which provides more rationality, flexibility and thus more efficiency to the compilation and decision-making process of urban regulatory detailed plan in China.

  8. Analysis and preliminary design of Kunming land use and planning management information system

    NASA Astrophysics Data System (ADS)

    Li, Li; Chen, Zhenjie

    2007-06-01

    This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.

  9. [Relationship between water supply, sanitation, public health, and environment: elements for the formulation of a sanitary infrastructure planning model].

    PubMed

    Soares, Sérgio R A; Bernardes, Ricardo S; Netto, Oscar de M Cordeiro

    2002-01-01

    The understanding of sanitation infrastructure, public health, and environmental relations is a fundamental assumption for planning sanitation infrastructure in urban areas. This article thus suggests elements for developing a planning model for sanitation infrastructure. The authors performed a historical survey of environmental and public health issues related to the sector, an analysis of the conceptual frameworks involving public health and sanitation systems, and a systematization of the various effects that water supply and sanitation have on public health and the environment. Evaluation of these effects should guarantee the correct analysis of possible alternatives, deal with environmental and public health objectives (the main purpose of sanitation infrastructure), and provide the most reasonable indication of actions. The suggested systematization of the sanitation systems effects in each step of their implementation is an advance considering the association between the fundamental elements for formulating a planning model for sanitation infrastructure.

  10. Vehicle management and mission planning systems with shuttle applications

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A preliminary definition of a concept for an automated system is presented that will support the effective management and planning of space shuttle operations. It is called the Vehicle Management and Mission Planning System (VMMPS). In addition to defining the system and its functions, some of the software requirements of the system are identified and a phased and evolutionary method is recommended for software design, development, and implementation. The concept is composed of eight software subsystems supervised by an executive system. These subsystems are mission design and analysis, flight scheduler, launch operations, vehicle operations, payload support operations, crew support, information management, and flight operations support. In addition to presenting the proposed system, a discussion of the evolutionary software development philosophy that the Mission Planning and Analysis Division (MPAD) would propose to use in developing the required supporting software is included. A preliminary software development schedule is also included.

  11. A Model for Implementing a Career Education System.

    ERIC Educational Resources Information Center

    Ryan, T. Antoinette

    The model for career education implementation defines three major functions which constitute the essential elements in the implementation process: planning, implementation, and evaluation. Emphasis is placed on the interrelatedness of implementation to both planning and evaluation of career education. The 11 subsystems involved in implementing…

  12. In-Memory Business Intelligence: Concepts and Performance

    NASA Astrophysics Data System (ADS)

    Rantung, V. P.; Kembuan, O.; Rompas, P. T. D.; Mewengkang, A.; Liando, O. E. S.; Sumayku, J.

    2018-02-01

    This research aims to discuss in-memory Business Intelligent (BI) and to model the business analysis questions to know the performance of the in-memory BI. By using, the Qlickview application found BI dashboards that easily accessed and modified. The dashboards are developed together using an agile development approach such as pre-study, planning, iterative execution, implementation, and evaluation. At the end, this research helping analyzer in choosing a right implementation for BI solution.

  13. VA Disability Benefits: Additional Planning Would Enhance Efforts to Improve the Timeliness of Appeals Decisions

    DTIC Science & Technology

    2017-03-01

    manage risks and help ensure successful implementation of significant institutional change. VA officials told GAO that pilot testing—which would...Organization: How Do I Implement Complex Change at Scale? Dallas, TX: McKinsey & Company, May 2011, and Project Management Institute , Inc. A Guide to...options compared in its analysis. We conducted this performance audit from February 2016 to March 2017 in accordance with generally accepted government

  14. Water-quality assessment of the western Lake Michigan drainages; analysis of available information on nutrients and suspended sediment, water years 1971-90

    USGS Publications Warehouse

    Robertson, Dale M.; Saad, D.A.

    1996-01-01

    To fulfill the goals of the NAWQA program, the USGS plans to examine 60 areas (study units) across the United States during full implementation of the program. In 1991, the NAWQA program went into full implementation with the intensive investigation of 20 of these study units; one of these study units is the Western Lake Michigan Drainages (WMIC) study unit.

  15. A Study on How to Implement an Effective Marketing and Education Program for Coordinated Care

    DTIC Science & Technology

    1992-11-01

    could play. Philip Kotler and Roberta N. Clarke (1987) recognize that the role marketing plays in health care organizations varies greatly. It is...accepted by professional marketers is provided by Kotler and Clarke (1987): Marketing is the analysis, planning, implementation, and control of carefully...Gaithersburg, MD: Aspen. Kotler , P. & Clarke, R. N. (1987). Marketina for health care organizations. Englewood Cliffs, NJ: Prentice-Hall. Leebov, W. (1988

  16. Making Strategic Planning Work: Experiences from a Private University. AIR 1986 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Chan, Susy S.

    Issues in implementating strategic planning in higher education management are considered, along with successful strategies and problem areas in implementing an integrated planning and budgeting process at DePaul University, a comprehensive Catholic university. Key implementation issues are as follows: (1) maintaining an organizational balance…

  17. 77 FR 24399 - Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year Emissions Inventory AGENCY... approve the ozone 2002 base year emissions inventory, portion of the state implementation plan (SIP... Atlanta, Georgia (hereafter referred to as ``the Atlanta Area'' or ``Area''), ozone attainment...

  18. 75 FR 39365 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-08

    ... Implementation Plan, Imperial County Air Pollution Control District; Final Rule #0;#0;Federal Register / Vol. 75... Implementation Plan, Imperial County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA... the Imperial County Air Pollution Control District (ICAPCD or the District) portion of the California...

  19. 75 FR 72963 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control of Volatile...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... Promulgation of Air Quality Implementation Plans; Maryland; Control of Volatile Organic Compound Emissions From Industrial Solvent Cleaning Operations; Withdrawal of Direct Final Rule AGENCY: Environmental Protection... withdrawing the direct final rule to approve revisions to Maryland's State Implementation Plan (SIP). This SIP...

  20. 75 FR 25775 - Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2009-0573; FRL-9146-5] Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District AGENCY: Environmental... South Coast Air Quality Management District (SCAQMD) portion of the California State Implementation Plan...

  1. 76 FR 55621 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-08

    ... California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental...-Solano Air Quality Management District portion of the California State Implementation Plan (SIP). This... the following local rule: Yolo-Solano Air Quality Management District Rule 2.41, Expandable...

  2. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... the California State Implementation Plan; South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the...

  3. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-29

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... rule. SUMMARY: EPA is proposing approval of a permitting rule submitted for the South Coast Air Quality Management District (District) portion of the California State Implementation Plan (SIP). The State is...

  4. 76 FR 72142 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does not...

  5. 75 FR 43114 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Emissions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ... Promulgation of Air Quality Implementation Plans; Texas; Revisions to Emissions Inventory Reporting... Consistent With the Cross Media Electronic Reporting Rule AGENCY: Environmental Protection Agency (EPA... revisions to the Texas State Implementation Plan (SIP) submitted by the Governor of Texas and by the Texas...

  6. 76 FR 4597 - Approval and Promulgation of Air Quality Implementation Plans; Kentucky; Disapproval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... intention to complete a rule to address interstate pollution transport in the eastern half of the... and Promulgation of Air Quality Implementation Plans; Kentucky; Disapproval of Interstate Transport... Kentucky's State implementation plan (SIP) meets the interstate transport requirements with regard to the...

  7. 78 FR 22785 - Approval and Promulgation of Air Quality Implementation Plans; Delaware, State Board Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-17

    ... Promulgation of Air Quality Implementation Plans; Delaware, State Board Requirements AGENCY: Environmental... revision to the Delaware State Implementation Plan (SIP) submitted by the Delaware Department of Natural Resources and Environmental Control (DNREC) on January 11, 2013. The SIP revision addresses requirements of...

  8. 77 FR 36442 - Approval and Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations AGENCY: Environmental Protection... Significant Deterioration (PSD) construction permit program of State of Michigan's State Implementation Plan (SIP) to meet the Clean Air Act (CAA) requirements for PSD in Class I Areas attaining the National...

  9. 75 FR 69909 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... four revisions to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking... reached via electronic mail at [email protected] . SUPPLEMENTARY INFORMATION: In the final rules section...

  10. 76 FR 508 - Approval and Promulgation of Implementation Plans; Idaho

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-05

    ... Promulgation of Implementation Plans; Idaho AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Idaho State Implementation Plan (SIP) that were submitted to EPA by the State of Idaho on April 16, 2007. This SIP submittal includes new and...

  11. 77 FR 18990 - Approval and Promulgation of Implementation Plans; New Mexico; Construction Permit Fees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... reviewing and acting on specific air quality construction permit applications received by the New Mexico... Promulgation of Implementation Plans; New Mexico; Construction Permit Fees AGENCY: Environmental Protection... replace existing rules, and revisions to the applicable State Implementation Plan (SIP) for New Mexico...

  12. 75 FR 20942 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-22

    ... Promulgation of Air Quality Implementation Plans; New Mexico; Transportation Conformity Requirement for... proposing to approve a revision to the New Mexico State Implementation Plan (SIP) at New Mexico Administrative Code 20.11.3, concerning transportation conformity rules for Bernalillo County, New Mexico. The...

  13. 75 FR 59180 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control Technique...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... Promulgation of Air Quality Implementation Plans; Maryland; Control Technique Guidelines for Paper, Film, and... Technique Guidelines (CTG) for paper, film, and foil coatings. These amendments will reduce volatile organic... Promulgation of Air Quality Implementation Plans; Maryland; Control Technique Guidelines for Paper, Film, and...

  14. 77 FR 66945 - Approval and Promulgation of Air Quality Implementation Plans; New Hampshire; Reasonably...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... and Promulgation of Air Quality Implementation Plans; New Hampshire; Reasonably Available Control... Implementation Plan (SIP) revision submitted by the State of New Hampshire. The revision establishes Reasonably... intended effect of this action is to approve these requirements into the New Hampshire SIP. This action is...

  15. 12 CFR 1291.3 - AHP Implementation Plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false AHP Implementation Plan. 1291.3 Section 1291.3 Banks and Banking FEDERAL HOUSING FINANCE AGENCY HOUSING GOALS AND MISSION FEDERAL HOME LOAN BANKS... AHP Implementation Plan without first consulting its Advisory Council. The Bank's board of directors...

  16. 40 CFR 49.9862 - Approval status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9862 Approval status. There are currently no EPA-approved Tribal rules or measures in the implementation plan for the Reservation of the Burns...

  17. 76 FR 68103 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-03

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the... State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District Rule 4692...

  18. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for emissions detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for...

  19. 40 CFR 49.9956 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... detrimental to public health or welfare. (k) Section 49.137Rule for air pollution episodes. (l) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (m) Section 49... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for...

  20. 40 CFR 49.9926 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... open burning. (h) Section 49.135Rule for emissions detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for...

  1. 40 CFR 49.9896 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... open burning. (h) Section 49.135Rule for emissions detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for...

  2. 78 FR 63878 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revised Ambient Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ...] Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revised Ambient Air Quality... State Implementation Plan (SIP). The revisions add ambient air quality standards and associated... Ambient Air Quality Standards (NAAQS) for PM 2.5 . EPA is approving these revisions in accordance with the...

  3. 78 FR 30829 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards Revision AGENCY... the Illinois State Implementation Plan (SIP) to reflect current national ambient air quality standards...) 692-2450. 4. Mail: Pamela Blakley, Chief, Control Strategies Section, Air Programs Branch (AR-18J), U...

  4. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-10

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... Implementation Plan (SIP) revision for the South Coast Air Quality Management District (SCAQMD or District... in a August 15, 2012 letter from the South Coast Air Quality Management District regarding specific...

  5. 75 FR 19886 - Approval and Promulgation of Air Quality Implementation Plans; Wyoming; Revisions to the Wyoming...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Promulgation of Air Quality Implementation Plans; Wyoming; Revisions to the Wyoming Air Quality Standards and.... Wyoming has revised its Air Quality Standards and Regulations, specifically Chapter 1, Section 5... Wyoming's State Implementation Plan (SIP). These revisions amend Wyoming's Air Quality Standards and...

  6. 78 FR 50369 - Approval and Promulgation of Air Quality Implementation Plans; Michigan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-19

    ...] Approval and Promulgation of Air Quality Implementation Plans; Michigan AGENCY: Environmental Protection... the State of Michigan's Clean Air Act State Implementation Plan (SIP) that Michigan had submitted on March 24, 2009. Michigan's submittal included revisions to Part 1, Definitions; Part 2, Air Use Approval...

  7. 78 FR 23524 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Particulate Matter...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... Promulgation of Air Quality Implementation Plans; Indiana; Particulate Matter Ambient Air Quality Standards... revise the Indiana State Implementation Plan (SIP) for particulate matter under the Clean Air Act. This submission contains the 24-hour fine particle National Ambient Air Quality Standards (NAAQS) promulgated by...

  8. Root cause analysis of serious adverse events among older patients in the Veterans Health Administration.

    PubMed

    Lee, Alexandra; Mills, Peter D; Neily, Julia; Hemphill, Robin R

    2014-06-01

    Preventable adverse events are more likely to occur among older patients because of the clinical complexity of their care. The Veterans Health Administration (VHA) National Center for Patient Safety (NCPS) stores data about serious adverse events when a root cause analysis (RCA) has been performed. A primary objective of this study was to describe the types of adverse events occurring among older patients (age > or = 65 years) in Department of Veterans Affairs (VA) hospitals. Secondary objectives were to determine the underlying reasons for the occurrence of these events and report on effective action plans that have been implemented in VA hospitals. In a retrospective, cross-sectional review, RCA reports were reviewed and outcomes reported using descriptive statistics for all VA hospitals that conducted an RCA for a serious geriatric adverse event from January 2010 to January 2011 that resulted in sustained injury or death. The search produced 325 RCA reports on VA patients (age > or = 65 years). Falls (34.8%), delays in diagnosis and/or treatment (11.7%), unexpected death (9.9%), and medication errors (9.0%) were the most commonly reported adverse events among older VA patients. Communication was the most common underlying reason for these events, representing 43.9% of reported root causes. Approximately 40% of implemented action plans were judged by local staff to be effective. The RCA process identified falls and communication as important themes in serious adverse events. Concrete actions, such as process standardization and changes to communication, were reported by teams to yield some improvement. However, fewer than half of the action plans were reported to be effective. Further research is needed to guide development and implementation of effective action plans.

  9. Integrated assessment of urban drainage system under the framework of uncertainty analysis.

    PubMed

    Dong, X; Chen, J; Zeng, S; Zhao, D

    2008-01-01

    Due to a rapid urbanization as well as the presence of large number of aging urban infrastructures in China, the urban drainage system is facing a dual pressure of construction and renovation nationwide. This leads to the need for an integrated assessment when an urban drainage system is under planning or re-design. In this paper, an integrated assessment methodology is proposed based upon the approaches of analytic hierarchy process (AHP), uncertainty analysis, mathematical simulation of urban drainage system and fuzzy assessment. To illustrate this methodology, a case study in Shenzhen City of south China has been implemented to evaluate and compare two different urban drainage system renovation plans, i.e., the distributed plan and the centralized plan. By comparing their water quality impacts, ecological impacts, technological feasibility and economic costs, the integrated performance of the distributed plan is found to be both better and robust. The proposed methodology is also found to be both effective and practical. (c) IWA Publishing 2008.

  10. OPTIGOV - A new methodology for evaluating Clinical Governance implementation by health providers

    PubMed Central

    2010-01-01

    Background The aim of Clinical Governance (CG) is to the pursuit of quality in health care through the integration of all the activities impacting on the patient into a single strategy. OPTIGOV (Optimizing Health Care Governance) is a methodology for the assessment of the level of implementation of CG within healthcare organizations. The aim of this paper is to explain the process underlying the development of OPTIGOV, and describe its characteristics and steps. Methods OPTIGOV was developed in 2006 by the Institute of Hygiene of the Catholic University of the Sacred Heart and Eurogroup Consulting Alliance. The main steps of the process were: choice of areas for analysis and questionnaire development, based on a review of scientific literature; assignment of scores and weights to individual questions and areas; implementation of a software interfaceable with Microsoft Office. Results OPTIGOV consists of: a) a hospital audit with a structured approach; b) development of an improvement operational plan. A questionnaire divided into 13 areas of analysis is used. For each area there is a form with a variable number of questions and "closed" answers. A score is assigned to each answer, area of analysis, healthcare department and unit. The single scores can be gathered for the organization as a whole. The software application allows for collation of data, calculation of scores and development of benchmarks to allow comparisons between healthcare organizations. Implementation consists of three stages: the preparation phase includes a kick off meeting, selection of interviewees and development of a survey plan. The registration phase includes hospital audits, reviewing of hospital documentation, data collection and score processing. Lastly, results are processed, inserted into a final report, and discussed in a meeting with the Hospital Board and in a final workshop. Conclusions The OPTIGOV methodology for the evaluation of CG implementation was developed with an evidence-based approach. The ongoing adoption of OPTIGOV in several projects will put to the test its potential to realistically represent the organization status, pinpoint criticalities and transferable best practices, provide a plan for improvement, and contribute to triggering changes and pursuit of quality in health care. PMID:20565967

  11. 40 CFR 52.622 - Original identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Original identification of plan. 52.622... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.622 Original identification of plan. (a) This section identified the original “State of Hawaii Air Pollution Control Implementation Plan...

  12. Implementing Student Information Systems

    ERIC Educational Resources Information Center

    Sullivan, Laurie; Porter, Rebecca

    2006-01-01

    Implementing an enterprise resource planning system is a complex undertaking. Careful planning, management, communication, and staffing can make the difference between a successful and unsuccessful implementation. (Contains 3 tables.)

  13. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  14. Connection, regulation, and care plan innovation: a case study of four nursing homes.

    PubMed

    Colón-Emeric, Cathleen S; Lekan-Rutledge, Deborah; Utley-Smith, Queen; Ammarell, Natalie; Bailey, Donald; Piven, Mary L; Corazzini, Kirsten; Anderson, Ruth A

    2006-01-01

    We describe how connections among nursing home staff impact the care planning process using a complexity science framework. We completed six-month case studies of four nursing homes. Field observations (n = 274), shadowing encounters (n = 69), and in-depth interviews (n = 122) of 390 staff at all levels were conducted. Qualitative analysis produced a conceptual/thematic description and complexity science concepts were used to produce conceptual insights. We observed that greater levels of staff connection were associated with higher care plan specificity and innovation. Connection of the frontline nursing staff was crucial for (1) implementation of the formal care plan and (2) spontaneous informal care planning responsive to changing resident needs. Although regulations could theoretically improve cognitive diversity and information flow in care planning, we observed instances of regulatory oversight resulting in less specific care plans and abandonment of an effective care planning process. Interventions which improve staff connectedness may improve resident outcomes.

  15. Incorporating geodiversity into conservation decisions.

    PubMed

    Comer, Patrick J; Pressey, Robert L; Hunter, Malcolm L; Schloss, Carrie A; Buttrick, Steven C; Heller, Nicole E; Tirpak, John M; Faith, Daniel P; Cross, Molly S; Shaffer, Mark L

    2015-06-01

    In a rapidly changing climate, conservation practitioners could better use geodiversity in a broad range of conservation decisions. We explored selected avenues through which this integration might improve decision making and organized them within the adaptive management cycle of assessment, planning, implementation, and monitoring. Geodiversity is seldom referenced in predominant environmental law and policy. With most natural resource agencies mandated to conserve certain categories of species, agency personnel are challenged to find ways to practically implement new directives aimed at coping with climate change while retaining their species-centered mandate. Ecoregions and ecological classifications provide clear mechanisms to consider geodiversity in plans or decisions, the inclusion of which will help foster the resilience of conservation to climate change. Methods for biodiversity assessment, such as gap analysis, climate change vulnerability analysis, and ecological process modeling, can readily accommodate inclusion of a geophysical component. We adapted others' approaches for characterizing landscapes along a continuum of climate change vulnerability for the biota they support from resistant, to resilient, to susceptible, and to sensitive and then summarized options for integrating geodiversity into planning in each landscape type. In landscapes that are relatively resistant to climate change, options exist to fully represent geodiversity while ensuring that dynamic ecological processes can change over time. In more susceptible landscapes, strategies aiming to maintain or restore ecosystem resilience and connectivity are paramount. Implementing actions on the ground requires understanding of geophysical constraints on species and an increasingly nimble approach to establishing management and restoration goals. Because decisions that are implemented today will be revisited and amended into the future, increasingly sophisticated forms of monitoring and adaptation will be required to ensure that conservation efforts fully consider the value of geodiversity for supporting biodiversity in the face of a changing climate. © 2015 Society for Conservation Biology.

  16. Development of a cooperative operational rendezvous plan for Eureca and other maneuvering Shuttle payloads

    NASA Technical Reports Server (NTRS)

    Gavin, R. T.

    1987-01-01

    This paper discusses the development of a new class of US Space Shuttle rendezvous missions which involve a maneuvering target vehicle. The objective of the analysis was to develop an operational plan to take advantage of the target spacecraft's maneuvering ability by making it responsible for a portion of the maneuvers necessary to achieve rendezvous. This work resulted in the development of a region in space relative to the Shuttle, called the control box, into which the target vehicle maneuvers. Furthermore, a mission operations plan was developed to implement the control box technique.

  17. Atmospheric, Magnetospheric and Plasmas in Space (AMPS) spacelab payload definition study - program analysis and planning for phase C/D document - Volume 7

    NASA Technical Reports Server (NTRS)

    Keeley, J. T.

    1976-01-01

    Typical missions identified for AMPS flights in the arly 1980's are described. Experiment objectives and typical scientific instruments selected to accomplish these objectives are discussed along with mission requirements and shuttle and Spacelab capabilities assessed to determine any AMPS unique requirements. Preliminary design concepts for the first two AMPS flights form the basis for the Phase C/D program plan. This plan implements flights 1 and 2 and indicates how both the scientific and flight support hardware can be systematically evolved for future AMPS flights.

  18. The Choice Controversy.

    ERIC Educational Resources Information Center

    Cookson, Peter W., Jr., Ed.

    Issues in school choice--constitutionality, feasibility, equity, and educational productivity--are examined in this book. The controversy requires an ongoing analysis of the origins of the school-choice movement, the kinds of plans proposed and implemented, their educational and social consequences, and the philosophical assumptions underlying the…

  19. 78 FR 17466 - Shipping Coordinating Committee; Notice of Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-21

    ... of other IMO bodies --Validation of model training courses --Unlawful practices associated with certificates of competency --Casualty analysis --Development of an e-navigation strategy implementation plan... personnel involved with tug-barge operations --Revision of the Recommendations on training of personnel on...

  20. Extended monitoring and analysis of moisture temperature data : research implementation plan.

    DOT National Transportation Integrated Search

    2006-12-07

    Variations in the mechanical properties of materials of a flexible pavement affect its response to applied : loads in the form of deflections, stresses and stains. The resilient modulus of asphalt concrete and of fine : grained subgrade soil vary sea...

Top