Sample records for analysis model dam

  1. Ant Colony Optimization Analysis on Overall Stability of High Arch Dam Basis of Field Monitoring

    PubMed Central

    Liu, Xiaoli; Chen, Hong-Xin; Kim, Jinxie

    2014-01-01

    A dam ant colony optimization (D-ACO) analysis of the overall stability of high arch dams on complicated foundations is presented in this paper. A modified ant colony optimization (ACO) model is proposed for obtaining dam concrete and rock mechanical parameters. A typical dam parameter feedback problem is proposed for nonlinear back-analysis numerical model based on field monitoring deformation and ACO. The basic principle of the proposed model is the establishment of the objective function of optimizing real concrete and rock mechanical parameter. The feedback analysis is then implemented with a modified ant colony algorithm. The algorithm performance is satisfactory, and the accuracy is verified. The m groups of feedback parameters, used to run a nonlinear FEM code, and the displacement and stress distribution are discussed. A feedback analysis of the deformation of the Lijiaxia arch dam and based on the modified ant colony optimization method is also conducted. By considering various material parameters obtained using different analysis methods, comparative analyses were conducted on dam displacements, stress distribution characteristics, and overall dam stability. The comparison results show that the proposal model can effectively solve for feedback multiple parameters of dam concrete and rock material and basically satisfy assessment requirements for geotechnical structural engineering discipline. PMID:25025089

  2. Variable-intercept panel model for deformation zoning of a super-high arch dam.

    PubMed

    Shi, Zhongwen; Gu, Chongshi; Qin, Dong

    2016-01-01

    This study determines dam deformation similarity indexes based on an analysis of deformation zoning features and panel data clustering theory, with comprehensive consideration to the actual deformation law of super-high arch dams and the spatial-temporal features of dam deformation. Measurement methods of these indexes are studied. Based on the established deformation similarity criteria, the principle used to determine the number of dam deformation zones is constructed through entropy weight method. This study proposes the deformation zoning method for super-high arch dams and the implementation steps, analyzes the effect of special influencing factors of different dam zones on the deformation, introduces dummy variables that represent the special effect of dam deformation, and establishes a variable-intercept panel model for deformation zoning of super-high arch dams. Based on different patterns of the special effect in the variable-intercept panel model, two panel analysis models were established to monitor fixed and random effects of dam deformation. Hausman test method of model selection and model effectiveness assessment method are discussed. Finally, the effectiveness of established models is verified through a case study.

  3. Dam break analysis and flood inundation map of Krisak dam for emergency action plan

    NASA Astrophysics Data System (ADS)

    Juliastuti, Setyandito, Oki

    2017-11-01

    The Indonesian Regulation which refers to the ICOLD Regulation (International Committee on Large Dam required have the Emergency Action Plan (EAP) guidelines because of the dams have potential failure. In EAP guidelines there is a management of evacuation where the determination of the inundation map based on flood modeling. The purpose of the EAP is to minimize the risk of loss of life and property in downstream which caused by dam failure. This paper will describe about develop flood modeling and inundation map in Krisak dam using numerical methods through dam break analysis (DBA) using hydraulic model Zhong Xing HY-21. The approaches of dam failure simulation are overtopping and piping. Overtopping simulation based on quadrangular, triangular and trapezium fracture. Piping simulation based on cracks of orifice. Using results of DBA, hazard classification of Krisak dam is very high. The nearest village affected dam failure is Singodutan village (distance is 1.45 kilometer from dam) with inundation depth is 1.85 meter. This result can be used by stakeholders such as emergency responders and the community at risk in formulating evacuation procedure.

  4. Risk Analysis of Earth-Rock Dam Failures Based on Fuzzy Event Tree Method

    PubMed Central

    Fu, Xiao; Gu, Chong-Shi; Su, Huai-Zhi; Qin, Xiang-Nan

    2018-01-01

    Earth-rock dams make up a large proportion of the dams in China, and their failures can induce great risks. In this paper, the risks associated with earth-rock dam failure are analyzed from two aspects: the probability of a dam failure and the resulting life loss. An event tree analysis method based on fuzzy set theory is proposed to calculate the dam failure probability. The life loss associated with dam failure is summarized and refined to be suitable for Chinese dams from previous studies. The proposed method and model are applied to one reservoir dam in Jiangxi province. Both engineering and non-engineering measures are proposed to reduce the risk. The risk analysis of the dam failure has essential significance for reducing dam failure probability and improving dam risk management level. PMID:29710824

  5. Numerical Modeling of Sliding Stability of RCC dam

    NASA Astrophysics Data System (ADS)

    Mughieda, O.; Hazirbaba, K.; Bani-Hani, K.; Daoud, W.

    2017-06-01

    Stability and stress analyses are the most important elements that require rigorous consideration in design of a dam structure. Stability of dams against sliding is crucial due to the substantial horizontal load that requires sufficient and safe resistance to develop by mobilization of adequate shearing forces along the base of the dam foundation. In the current research, the static sliding stability of a roller-compacted-concrete (RCC) dam was modelled using finite element method to investigate the stability against sliding. A commercially available finite element software (SAP 2000) was used to analyze stresses in the body of the dam and foundation. A linear finite element static analysis was performed in which a linear plane strain isoperimetric four node elements was used for modelling the dam-foundation system. The analysis was carried out assuming that no slip will occur at the interface between the dam and the foundation. Usual static loading condition was applied for the static analysis. The greatest tension was found to develop in the rock adjacent to the toe of the upstream slope. The factor of safety against sliding along the entire base of the dam was found to be greater than 1 (FS>1), for static loading conditions.

  6. Risk analysis of gravity dam instability using credibility theory Monte Carlo simulation model.

    PubMed

    Xin, Cao; Chongshi, Gu

    2016-01-01

    Risk analysis of gravity dam stability involves complicated uncertainty in many design parameters and measured data. Stability failure risk ratio described jointly by probability and possibility has deficiency in characterization of influence of fuzzy factors and representation of the likelihood of risk occurrence in practical engineering. In this article, credibility theory is applied into stability failure risk analysis of gravity dam. Stability of gravity dam is viewed as a hybrid event considering both fuzziness and randomness of failure criterion, design parameters and measured data. Credibility distribution function is conducted as a novel way to represent uncertainty of influence factors of gravity dam stability. And combining with Monte Carlo simulation, corresponding calculation method and procedure are proposed. Based on a dam section, a detailed application of the modeling approach on risk calculation of both dam foundation and double sliding surfaces is provided. The results show that, the present method is feasible to be applied on analysis of stability failure risk for gravity dams. The risk assessment obtained can reflect influence of both sorts of uncertainty, and is suitable as an index value.

  7. Life sciences domain analysis model

    PubMed Central

    Freimuth, Robert R; Freund, Elaine T; Schick, Lisa; Sharma, Mukesh K; Stafford, Grace A; Suzek, Baris E; Hernandez, Joyce; Hipp, Jason; Kelley, Jenny M; Rokicki, Konrad; Pan, Sue; Buckler, Andrew; Stokes, Todd H; Fernandez, Anna; Fore, Ian; Buetow, Kenneth H

    2012-01-01

    Objective Meaningful exchange of information is a fundamental challenge in collaborative biomedical research. To help address this, the authors developed the Life Sciences Domain Analysis Model (LS DAM), an information model that provides a framework for communication among domain experts and technical teams developing information systems to support biomedical research. The LS DAM is harmonized with the Biomedical Research Integrated Domain Group (BRIDG) model of protocol-driven clinical research. Together, these models can facilitate data exchange for translational research. Materials and methods The content of the LS DAM was driven by analysis of life sciences and translational research scenarios and the concepts in the model are derived from existing information models, reference models and data exchange formats. The model is represented in the Unified Modeling Language and uses ISO 21090 data types. Results The LS DAM v2.2.1 is comprised of 130 classes and covers several core areas including Experiment, Molecular Biology, Molecular Databases and Specimen. Nearly half of these classes originate from the BRIDG model, emphasizing the semantic harmonization between these models. Validation of the LS DAM against independently derived information models, research scenarios and reference databases supports its general applicability to represent life sciences research. Discussion The LS DAM provides unambiguous definitions for concepts required to describe life sciences research. The processes established to achieve consensus among domain experts will be applied in future iterations and may be broadly applicable to other standardization efforts. Conclusions The LS DAM provides common semantics for life sciences research. Through harmonization with BRIDG, it promotes interoperability in translational science. PMID:22744959

  8. Quantifying recreation use values from removing dams and restoring free-flowing rivers: A contingent behavior travel cost demand model for the Lower Snake River

    NASA Astrophysics Data System (ADS)

    Loomis, John

    2002-06-01

    A travel cost demand model that uses intended trips if dams are removed and the river restored is presented as a tool for evaluating the potential recreation benefits in this counterfactual but increasingly policy relevant analysis of dam removal. The model is applied to the Lower Snake River in Washington using data from mail surveys of households in the Pacific Northwest region. Five years after dam removal, about 1.5 million visitor days are estimated, with this number growing to 2.5 million annually during years 20-100. Using the travel cost method model estimate of the value of river recreation, if the four dams are removed and the 225 km river is restored, the annualized benefits at a 6.875% discount rate would be $310 million. This gain in river recreation exceeds the loss of reservoir recreation but is about $60 million less than the total costs of the dam removal alternative. The analysis suggests this extension of the standard travel cost method may be suitable for evaluating the gain in river recreation associated with restoration of river systems from dam removal or associated with dam relicensing conditions.

  9. Small Displacement Coupled Analysis of Concrete Gravity Dam Foundations: Static and Dynamic Conditions

    NASA Astrophysics Data System (ADS)

    Farinha, Maria Luísa Braga; Azevedo, Nuno Monteiro; Candeias, Mariline

    2017-02-01

    The explicit formulation of a small displacement model for the coupled hydro-mechanical analysis of concrete gravity dam foundations based on joint finite elements is presented. The proposed coupled model requires a thorough pre-processing stage in order to ensure that the interaction between the various blocks which represent both the rock mass foundation and the dam is always edge to edge. The mechanical part of the model, though limited to small displacements, has the advantage of allowing an accurate representation of the stress distribution along the interfaces, such as rock mass joints. The hydraulic part and the mechanical part of the model are fully compatible. The coupled model is validated using a real case of a dam in operation, by comparison of the results with those obtained with a large displacement discrete model. It is shown that it is possible to assess the sliding stability of concrete gravity dams using small displacement models under both static and dynamic conditions.

  10. Dynamic decision making for dam-break emergency management - Part 2: Application to Tangjiashan landslide dam failure

    NASA Astrophysics Data System (ADS)

    Peng, M.; Zhang, L. M.

    2013-02-01

    Tangjiashan landslide dam, which was triggered by the Ms = 8.0 Wenchuan earthquake in 2008 in China, threatened 1.2 million people downstream of the dam. All people in Beichuan Town 3.5 km downstream of the dam and 197 thousand people in Mianyang City 85 km downstream of the dam were evacuated 10 days before the breaching of the dam. Making such an important decision under uncertainty was difficult. This paper applied a dynamic decision-making framework for dam-break emergency management (DYDEM) to help rational decision in the emergency management of the Tangjiashan landslide dam. Three stages are identified with different levels of hydrological, geological and social-economic information along the timeline of the landslide dam failure event. The probability of dam failure is taken as a time series. The dam breaching parameters are predicted with a set of empirical models in stage 1 when no soil property information is known, and a physical model in stages 2 and 3 when knowledge of soil properties has been obtained. The flood routing downstream of the dam in these three stages is analyzed to evaluate the population at risk (PAR). The flood consequences, including evacuation costs, flood damage and monetized loss of life, are evaluated as functions of warning time using a human risk analysis model based on Bayesian networks. Finally, dynamic decision analysis is conducted to find the optimal time to evacuate the population at risk with minimum total loss in each of these three stages.

  11. Dam failure analysis for the Lago El Guineo Dam, Orocovis, Puerto Rico

    USGS Publications Warehouse

    Gómez-Fragoso, Julieta; Heriberto Torres-Sierra,

    2016-08-09

    The U.S. Geological Survey, in cooperation with the Puerto Rico Electric Power Authority, completed hydrologic and hydraulic analyses to assess the potential hazard to human life and property associated with the hypothetical failure of the Lago El Guineo Dam. The Lago El Guineo Dam is within the headwaters of the Río Grande de Manatí and impounds a drainage area of about 4.25 square kilometers.The hydrologic assessment was designed to determine the outflow hydrographs and peak discharges for Lago El Guineo and other subbasins in the Río Grande de Manatí hydrographic basin for three extreme rainfall events: (1) a 6-hour probable maximum precipitation event, (2) a 24-hour probable maximum precipitation event, and (3) a 24-hour, 100-year recurrence rainfall event. The hydraulic study simulated a dam failure of Lago El Guineo Dam using flood hydrographs generated from the hydrologic study. The simulated dam failure generated a hydrograph that was routed downstream from Lago El Guineo Dam through the lower reaches of the Río Toro Negro and the Río Grande de Manatí to determine water-surface profiles developed from the event-based hydrologic scenarios and “sunny day” conditions. The Hydrologic Engineering Center’s Hydrologic Modeling System (HEC–HMS) and Hydrologic Engineering Center’s River Analysis System (HEC–RAS) computer programs, developed by the U.S. Army Corps of Engineers, were used for the hydrologic and hydraulic modeling, respectively. The flow routing in the hydraulic analyses was completed using the unsteady flow module available in the HEC–RAS model.Above the Lago El Guineo Dam, the simulated inflow peak discharges from HEC–HMS resulted in about 550 and 414 cubic meters per second for the 6- and 24-hour probable maximum precipitation events, respectively. The 24-hour, 100-year recurrence storm simulation resulted in a peak discharge of about 216 cubic meters per second. For the hydrologic analysis, no dam failure conditions are considered within the model. The results of the hydrologic simulations indicated that for all hydrologic conditions scenarios, the Lago El Guineo Dam would not experience overtopping. For the dam breach hydraulic analysis, failure by piping was the selected hypothetical failure mode for the Lago El Guineo Dam.Results from the simulated dam failure of the Lago El Guineo Dam using the HEC–RAS model for the 6- and 24-hour probable maximum precipitation events indicated peak discharges below the dam of 1,342.43 and 1,434.69 cubic meters per second, respectively. Dam failure during the 24-hour, 100-year recurrence rainfall event resulted in a peak discharge directly downstream from Lago El Guineo Dam of 1,183.12 cubic meters per second. Dam failure during sunny-day conditions (no precipitation) produced a peak discharge at Lago El Guineo Dam of 1,015.31 cubic meters per second assuming the initial water-surface elevation was at the morning-glory spillway invert elevation.The results of the hydraulic analysis indicate that the flood would extend to many inhabited areas along the stream banks from the Lago El Guineo Dam to the mouth of the Río Grande as a result of the simulated failure of the Lago El Guineo Dam. Low-lying regions in the vicinity of Ciales, Manatí, and Barceloneta, Puerto Rico, are among the regions that would be most affected by failure of the Lago El Guineo Dam. Effects of the flood control (levee) structure constructed in 2000 to provide protection to the low-lying populated areas of Barceloneta, Puerto Rico, were considered in the hydraulic analysis of dam failure. The results indicate that overtopping can be expected in the aforementioned levee during 6- and 24-hour probable maximum precipitation events. The levee was not overtopped during dam failure scenarios under the 24-hour, 100-year recurrence rainfall event or sunny-day conditions.

  12. Simulated effects of dam removal on water temperatures along the Klamath River, Oregon and California, using 2010 Biological Opinion flow requirements

    USGS Publications Warehouse

    Risley, John C.; Brewer, Scott J.; Perry, Russell W.

    2012-01-01

    Computer model simulations were run to determine the effects of dam removal on water temperatures along the Klamath River, located in south-central Oregon and northern California, using flow requirements defined in the 2010 Biological Opinion of the National Marine Fisheries Service. A one-dimensional, daily averaged water temperature model (River Basin Model-10) developed by the U.S. Environmental Protection Agency Region 10, Seattle, Washington, was used in the analysis. This model had earlier been configured and calibrated for the Klamath River by the U.S. Geological Survey for the U.S. Department of the Interior, Klamath Secretarial Determination to simulate the effects of dam removal on water temperatures for current (2011) and future climate change scenarios. The analysis for this report was performed outside of the scope of the Klamath Secretarial Determination process at the request of the Bureau of Reclamation Technical Services Office, Denver, Colorado.For this analysis, two dam scenarios were simulated: “dams in” and “dams out.” In the “dams in” scenario, existing dams in the Klamath River were kept in place. In the “dams out” scenario, the river was modeled as a natural stream, without the J.C. Boyle, Copco1, Copco2, and Iron Gate Dams, for the entire simulation period. Output from the two dam scenario simulations included daily water temperatures simulated at 29 locations for a 50-year period along the Klamath River between river mile 253 (downstream of Link River Dam) and the Pacific Ocean. Both simulations used identical flow requirements, formulated in the 2010 Biological Opinion, and identical climate conditions based on the period 1961–2009.Simulated water temperatures from January through June at almost all locations between J.C. Boyle Reservoir and the Pacific Ocean were higher for the “dams out” scenario than for the “dams in” scenario. The simulated mean monthly water temperature increase was highest [1.7–2.2 degrees Celsius (°C)] in May downstream of Iron Gate Dam. However, from August to December, dam removal generally cooled water temperatures. During these months, water temperatures decreased 1°C or more between Copco Lake and locations 50 miles or more downstream. The greatest mean monthly temperature decrease was 4°C in October just downstream of Iron Gate Dam. Near the ocean, the effects of dam removal were small (less than 0.2°C) for most months. However, the mean November temperature near the ocean was almost 0.5°C cooler with dam removal.

  13. Geophysical Investigations at Hidden Dam, Raymond, California Flow Simulations

    USGS Publications Warehouse

    Minsley, Burke J.; Ikard, Scott

    2010-01-01

    Numerical flow modeling and analysis of observation-well data at Hidden Dam are carried out to supplement recent geophysical field investigations at the site (Minsley and others, 2010). This work also is complementary to earlier seepage-related studies at Hidden Dam documented by Cedergren (1980a, b). Known seepage areas on the northwest right abutment area of the downstream side of the dam was documented by Cedergren (1980a, b). Subsequent to the 1980 seepage study, a drainage blanket with a sub-drain system was installed to mitigate downstream seepage. Flow net analysis provided by Cedergren (1980a, b) suggests that the primary seepage mechanism involves flow through the dam foundation due to normal reservoir pool elevations, which results in upflow that intersects the ground surface in several areas on the downstream side of the dam. In addition to the reservoir pool elevations and downstream surface topography, flow is also controlled by the existing foundation geology as well as the presence or absence of a horizontal drain in the downstream portion of the dam. The current modeling study is aimed at quantifying how variability in dam and foundation hydrologic properties influences seepage as a function of reservoir stage. Flow modeling is implemented using the COMSOL Multiphysics software package, which solves the partially saturated flow equations in a two-dimensional (2D) cross-section of Hidden Dam that also incorporates true downstream topography. Use of the COMSOL software package provides a more quantitative approach than the flow net analysis by Cedergren (1980a, b), and allows for rapid evaluation of the influence of various parameters such as reservoir level, dam structure and geometry, and hydrogeologic properties of the dam and foundation materials. Historical observation-well data are used to help validate the flow simulations by comparing observed and predicted water levels for a range of reservoir elevations. The flow models are guided by, and discussed in the context of, the geophysical work (Minsley and others, 2010) where appropriate.

  14. Seismic performance of arch dams on non-homogeneous and discontinuous foundations (a case study: Karun 4 Dam)

    NASA Astrophysics Data System (ADS)

    Ferdousi, A.

    2017-06-01

    The present study set out to investigate the nonlinear seismic response of the dam-reservoir-rock foundation system, taking into consideration the effects of change in the material properties of discontinuous foundation. To this end, it is important to provide the proper modeling of truncated boundary conditions at the far-end of rock foundation and reservoir fluid domain and to correctly apply the in situ stresses for rock foundation. The nonlinear seismic response of an arch dam mainly depends on the opening and sliding of the dam body's contraction joints and foundation discontinuities, failure of the jointed rock and concrete materials, etc. In this paper, a time domain dynamic analysis of the 3D dam-reservoir-foundation interaction problem was performed by developing a nonlinear Finite Element program. The results of the analysis of Karun-4 Dam revealed the essential role of modeling discontinuities and boundary conditions of rock foundation under seismic excitation.

  15. Monitoring dam structural health from space: Insights from novel InSAR techniques and multi-parametric modeling applied to the Pertusillo dam Basilicata, Italy

    NASA Astrophysics Data System (ADS)

    Milillo, Pietro; Perissin, Daniele; Salzer, Jacqueline T.; Lundgren, Paul; Lacava, Giusy; Milillo, Giovanni; Serio, Carmine

    2016-10-01

    The availability of new constellations of synthetic aperture radar (SAR) sensors is leading to important advances in infrastructure monitoring. These constellations offer the advantage of reduced revisit times, providing low-latency data that enable analysis that can identify infrastructure instability and dynamic deformation processes. In this paper we use COSMO-SkyMed (CSK) and TerraSAR-X (TSX) data to monitor seasonal induced deformation at the Pertusillo dam (Basilicata, Italy) using multi-temporal SAR data analysis. We analyzed 198 images spanning 2010-2015 using a coherent and incoherent PS approach to merge COSMO-SkyMed adjacent tracks and TerraSAR-X acquisitions, respectively. We used hydrostatic-seasonal-temporal (HST) and hydrostatic-temperature-temporal (HTT) models to interpret the non-linear deformation at the dam wall using ground measurements together with SAR time-series analysis. Different look geometries allowed us to characterize the horizontal deformation field typically observed at dams. Within the limits of our models and the SAR acquisition sampling we found that most of the deformation at the Pertusillo dam can be explained by taking into account only thermal seasonal dilation and hydrostatic pressure. The different models show slightly different results when interpreting the aging term at the dam wall. The results highlight how short-revisit SAR satellites in combination with models widely used in the literature for interpreting pendulum and GPS data can be used for supporting structural health monitoring and provide valuable information to ground users directly involved in field measurements.

  16. Displacement-based back-analysis of the model parameters of the Nuozhadu high earth-rockfill dam.

    PubMed

    Wu, Yongkang; Yuan, Huina; Zhang, Bingyin; Zhang, Zongliang; Yu, Yuzhen

    2014-01-01

    The parameters of the constitutive model, the creep model, and the wetting model of materials of the Nuozhadu high earth-rockfill dam were back-analyzed together based on field monitoring displacement data by employing an intelligent back-analysis method. In this method, an artificial neural network is used as a substitute for time-consuming finite element analysis, and an evolutionary algorithm is applied for both network training and parameter optimization. To avoid simultaneous back-analysis of many parameters, the model parameters of the three main dam materials are decoupled and back-analyzed separately in a particular order. Displacement back-analyses were performed at different stages of the construction period, with and without considering the creep and wetting deformations. Good agreement between the numerical results and the monitoring data was obtained for most observation points, which implies that the back-analysis method and decoupling method are effective for solving complex problems with multiple models and parameters. The comparison of calculation results based on different sets of back-analyzed model parameters indicates the necessity of taking the effects of creep and wetting into consideration in the numerical analyses of high earth-rockfill dams. With the resulting model parameters, the stress and deformation distributions at completion are predicted and analyzed.

  17. Seasonal trend analysis and ARIMA modeling of relative humidity and wind speed time series around Yamula Dam

    NASA Astrophysics Data System (ADS)

    Eymen, Abdurrahman; Köylü, Ümran

    2018-02-01

    Local climate change is determined by analysis of long-term recorded meteorological data. In the statistical analysis of the meteorological data, the Mann-Kendall rank test, which is one of the non-parametrical tests, has been used; on the other hand, for determining the power of the trend, Theil-Sen method has been used on the data obtained from 16 meteorological stations. The stations cover the provinces of Kayseri, Sivas, Yozgat, and Nevşehir in the Central Anatolia region of Turkey. Changes in land-use affect local climate. Dams are structures that cause major changes on the land. Yamula Dam is located 25 km northwest of Kayseri. The dam has huge water body which is approximately 85 km2. The mentioned tests have been used for detecting the presence of any positive or negative trend in meteorological data. The meteorological data in relation to the seasonal average, maximum, and minimum values of the relative humidity and seasonal average wind speed have been organized as time series and the tests have been conducted accordingly. As a result of these tests, the following have been identified: increase was observed in minimum relative humidity values in the spring, summer, and autumn seasons. As for the seasonal average wind speed, decrease was detected for nine stations in all seasons, whereas increase was observed in four stations. After the trend analysis, pre-dam mean relative humidity time series were modeled with Autoregressive Integrated Moving Averages (ARIMA) model which is statistical modeling tool. Post-dam relative humidity values were predicted by ARIMA models.

  18. Flood hydrology and dam-breach hydraulic analyses of five reservoirs in Colorado

    USGS Publications Warehouse

    Stevens, Michael R.; Hoogestraat, Galen K.

    2013-01-01

    The U.S. Department of Agriculture Forest Service has identified hazard concerns for areas downstream from five Colorado dams on Forest Service land. In 2009, the U.S. Geological Survey, in cooperation with the Forest Service, initiated a flood hydrology analysis to estimate the areal extent of potential downstream flood inundation and hazard to downstream life, property, and infrastructure if dam breach occurs. Readily available information was used for dam-breach assessments of five small Colorado reservoirs (Balman Reservoir, Crystal Lake, Manitou Park Lake, McGinnis Lake, and Million Reservoir) that are impounded by an earthen dam, and no new data were collected for hydraulic modeling. For each reservoir, two dam-breach scenarios were modeled: (1) the dam is overtopped but does not fail (break), and (2) the dam is overtopped and dam-break occurs. The dam-breach scenarios were modeled in response to the 100-year recurrence, 500-year recurrence, and the probable maximum precipitation, 24-hour duration rainstorms to predict downstream flooding. For each dam-breach and storm scenario, a flood inundation map was constructed to estimate the extent of flooding in areas of concern downstream from each dam. Simulation results of the dam-break scenarios were used to determine the hazard classification of the dam structure (high, significant, or low), which is primarily based on the potential for loss of life and property damage resulting from the predicted downstream flooding.

  19. Accuracy Analysis of a Dam Model from Drone Surveys

    PubMed Central

    Buffi, Giulia; Venturi, Sara

    2017-01-01

    This paper investigates the accuracy of models obtained by drone surveys. To this end, this work analyzes how the placement of ground control points (GCPs) used to georeference the dense point cloud of a dam affects the resulting three-dimensional (3D) model. Images of a double arch masonry dam upstream face are acquired from drone survey and used to build the 3D model of the dam for vulnerability analysis purposes. However, there still remained the issue of understanding the real impact of a correct GCPs location choice to properly georeference the images and thus, the model. To this end, a high number of GCPs configurations were investigated, building a series of dense point clouds. The accuracy of these resulting dense clouds was estimated comparing the coordinates of check points extracted from the model and their true coordinates measured via traditional topography. The paper aims at providing information about the optimal choice of GCPs placement not only for dams but also for all surveys of high-rise structures. The knowledge a priori of the effect of the GCPs number and location on the model accuracy can increase survey reliability and accuracy and speed up the survey set-up operations. PMID:28771185

  20. Accuracy Analysis of a Dam Model from Drone Surveys.

    PubMed

    Ridolfi, Elena; Buffi, Giulia; Venturi, Sara; Manciola, Piergiorgio

    2017-08-03

    This paper investigates the accuracy of models obtained by drone surveys. To this end, this work analyzes how the placement of ground control points (GCPs) used to georeference the dense point cloud of a dam affects the resulting three-dimensional (3D) model. Images of a double arch masonry dam upstream face are acquired from drone survey and used to build the 3D model of the dam for vulnerability analysis purposes. However, there still remained the issue of understanding the real impact of a correct GCPs location choice to properly georeference the images and thus, the model. To this end, a high number of GCPs configurations were investigated, building a series of dense point clouds. The accuracy of these resulting dense clouds was estimated comparing the coordinates of check points extracted from the model and their true coordinates measured via traditional topography. The paper aims at providing information about the optimal choice of GCPs placement not only for dams but also for all surveys of high-rise structures. The knowledge a priori of the effect of the GCPs number and location on the model accuracy can increase survey reliability and accuracy and speed up the survey set-up operations.

  1. Dam-breach analysis and flood-inundation mapping for Lakes Ellsworth and Lawtonka near Lawton, Oklahoma

    USGS Publications Warehouse

    Rendon, Samuel H.; Ashworth, Chad E.; Smith, S. Jerrod

    2012-01-01

    Dams provide beneficial functions such as flood control, recreation, and reliable water supplies, but they also entail risk: dam breaches and resultant floods can cause substantial property damage and loss of life. The State of Oklahoma requires each owner of a high-hazard dam, which the Federal Emergency Management Agency defines as dams for which failure or misoperation probably will cause loss of human life, to develop an emergency action plan specific to that dam. Components of an emergency action plan are to simulate a flood resulting from a possible dam breach and map the resulting downstream flood-inundation areas. The resulting flood-inundation maps can provide valuable information to city officials, emergency managers, and local residents for planning the emergency response if a dam breach occurs. Accurate topographic data are vital for developing flood-inundation maps. This report presents results of a cooperative study by the city of Lawton, Oklahoma, and the U.S. Geological Survey (USGS) to model dam-breach scenarios at Lakes Ellsworth and Lawtonka near Lawton and to map the potential flood-inundation areas of such dam breaches. To assist the city of Lawton with completion of the emergency action plans for Lakes Ellsworth and Lawtonka Dams, the USGS collected light detection and ranging (lidar) data that were used to develop a high-resolution digital elevation model and a 1-foot contour elevation map for the flood plains downstream from Lakes Ellsworth and Lawtonka. This digital elevation model and field measurements, streamflow-gaging station data (USGS streamflow-gaging station 07311000, East Cache Creek near Walters, Okla.), and hydraulic values were used as inputs for the dynamic (unsteady-flow) model, Hydrologic Engineering Center's River Analysis System (HEC-RAS). The modeled flood elevations were exported to a geographic information system to produce flood-inundation maps. Water-surface profiles were developed for a 75-percent probable maximum flood scenario and a sunny-day dam-breach scenario, as well as for maximum flood-inundation elevations and flood-wave arrival times for selected bridge crossings. Some areas of concern near the city of Lawton, if a dam breach occurs at Lakes Ellsworth or Lawtonka, include water treatment plants, wastewater treatment plants, recreational areas, and community-services offices.

  2. Dam-breach analysis and flood-inundation mapping for selected dams in Oklahoma City, Oklahoma, and near Atoka, Oklahoma

    USGS Publications Warehouse

    Shivers, Molly J.; Smith, S. Jerrod; Grout, Trevor S.; Lewis, Jason M.

    2015-01-01

    Digital-elevation models, field survey measurements, hydraulic data, and hydrologic data (U.S. Geological Survey streamflow-gaging stations North Canadian River below Lake Overholser near Oklahoma City, Okla. [07241000], and North Canadian River at Britton Road at Oklahoma City, Okla. [07241520]), were used as inputs for the one-dimensional dynamic (unsteady-flow) models using Hydrologic Engineering Centers River Analysis System (HEC–RAS) software. The modeled flood elevations were exported to a geographic information system to produce flood-inundation maps. Water-surface profiles were developed for a 75-percent probable maximum flood dam-breach scenario and a sunny-day dam-breach scenario, as well as for maximum flood-inundation elevations and flood-wave arrival times at selected bridge crossings. Points of interest such as community-services offices, recreational areas, water-treatment plants, and wastewater-treatment plants were identified on the flood-inundation maps.

  3. An analysis of the potential for Glen Canyon Dam releases to inundate archaeological sites in the Grand Canyon, Arizona

    USGS Publications Warehouse

    Sondossi, Hoda A.; Fairley, Helen C.

    2014-01-01

    The development of a one-dimensional flow-routing model for the Colorado River between Lees Ferry and Diamond Creek, Arizona in 2008 provided a potentially useful tool for assessing the degree to which varying discharges from Glen Canyon Dam may inundate terrestrial environments and potentially affect resources located within the zone of inundation. Using outputs from the model, a geographic information system analysis was completed to evaluate the degree to which flows from Glen Canyon Dam might inundate archaeological sites located along the Colorado River in the Grand Canyon. The analysis indicates that between 4 and 19 sites could be partially inundated by flows released from Glen Canyon Dam under current (2014) operating guidelines, and as many as 82 archaeological sites may have been inundated to varying degrees by uncontrolled high flows released in June 1983. Additionally, the analysis indicates that more of the sites currently (2014) proposed for active management by the National Park Service are located at low elevations and, therefore, tend to be more susceptible to potential inundation effects than sites not currently (2014) targeted for management actions, although the potential for inundation occurs in both groups of sites. Because of several potential sources of error and uncertainty associated with the model and with limitations of the archaeological data used in this analysis, the results are not unequivocal. These caveats, along with the fact that dam-related impacts can involve more than surface-inundation effects, suggest that the results of this analysis should be used with caution to infer potential effects of Glen Canyon Dam on archaeological sites in the Grand Canyon.

  4. Mathematical Modeling and Numerical Analysis of Thermal Distribution in Arch Dams considering Solar Radiation Effect

    PubMed Central

    Mirzabozorg, H.; Hariri-Ardebili, M. A.; Shirkhan, M.; Seyed-Kolbadi, S. M.

    2014-01-01

    The effect of solar radiation on thermal distribution in thin high arch dams is investigated. The differential equation governing thermal behavior of mass concrete in three-dimensional space is solved applying appropriate boundary conditions. Solar radiation is implemented considering the dam face direction relative to the sun, the slop relative to horizon, the region cloud cover, and the surrounding topography. It has been observed that solar radiation changes the surface temperature drastically and leads to nonuniform temperature distribution. Solar radiation effects should be considered in thermal transient analysis of thin arch dams. PMID:24695817

  5. Mathematical modeling and numerical analysis of thermal distribution in arch dams considering solar radiation effect.

    PubMed

    Mirzabozorg, H; Hariri-Ardebili, M A; Shirkhan, M; Seyed-Kolbadi, S M

    2014-01-01

    The effect of solar radiation on thermal distribution in thin high arch dams is investigated. The differential equation governing thermal behavior of mass concrete in three-dimensional space is solved applying appropriate boundary conditions. Solar radiation is implemented considering the dam face direction relative to the sun, the slop relative to horizon, the region cloud cover, and the surrounding topography. It has been observed that solar radiation changes the surface temperature drastically and leads to nonuniform temperature distribution. Solar radiation effects should be considered in thermal transient analysis of thin arch dams.

  6. Fragility Analysis of Concrete Gravity Dams

    NASA Astrophysics Data System (ADS)

    Tekie, Paulos B.; Ellingwood, Bruce R.

    2002-09-01

    Concrete gravity dams are an important part ofthe nation's infrastructure. Many dams have been in service for over 50 years, during which time important advances in the methodologies for evaluation of natural phenomena hazards have caused the design-basis events to be revised upwards, in some cases significantly. Many existing dams fail to meet these revised safety criteria and structural rehabilitation to meet newly revised criteria may be costly and difficult. A probabilistic safety analysis (PSA) provides a rational safety assessment and decision-making tool managing the various sources of uncertainty that may impact dam performance. Fragility analysis, which depicts fl%e uncertainty in the safety margin above specified hazard levels, is a fundamental tool in a PSA. This study presents a methodology for developing fragilities of concrete gravity dams to assess their performance against hydrologic and seismic hazards. Models of varying degree of complexity and sophistication were considered and compared. The methodology is illustrated using the Bluestone Dam on the New River in West Virginia, which was designed in the late 1930's. The hydrologic fragilities showed that the Eluestone Dam is unlikely to become unstable at the revised probable maximum flood (PMF), but it is likely that there will be significant cracking at the heel ofthe dam. On the other hand, the seismic fragility analysis indicated that sliding is likely, if the dam were to be subjected to a maximum credible earthquake (MCE). Moreover, there will likely be tensile cracking at the neck of the dam at this level of seismic excitation. Probabilities of relatively severe limit states appear to be only marginally affected by extremely rare events (e.g. the PMF and MCE). Moreover, the risks posed by the extreme floods and earthquakes were not balanced for the Bluestone Dam, with seismic hazard posing a relatively higher risk.

  7. Effect of Seepage on Change in Stress Distribution Scenario in Static and Seismic Behaviour of Earthen Dams

    NASA Astrophysics Data System (ADS)

    Nandi, N.; Chowdhury, Roy; Dutta, S. C.

    2018-02-01

    The present study makes an effort to understand the damage of earthen dams under static and seismic loading condition. To make the investigation more realistic, behaviour of earthen dams considering the occurrence of a phreatic line indicating the submerged zone due to seepage within the dam body is considered. In case of earthen dams, homogeneous or nonhomogeneous, the consideration of the occurrence of a phreatic line or seepage line through the dam body is an important part of the earthen dam design methodology. The impervious material properties in the submerged zone below the phreatic line due to seepage may differ a lot in magnitudes as compared to the value of the same materials lying above this line. Hence, to have the exact stress distribution scenarios within the earthen dam, the different material properties above and below the phreatic line are considered in this present study. The study is first carried out by two-dimensional as well as three-dimensional finite element analysis under static loading condition. The work is further extended to observe the effect of seepage due to the consideration of the phreatic line on dynamic characteristics of earthen dams. Free vibration analysis and seismic analysis based on the Complete Quadratic Combination (CQC) method by considering twodimensional and three-dimensional modeling are carried out to present the frequencies, mode shapes and the stress distribution pattern of the earthen dam.

  8. An updated numerical simulation of the ground-water flow system for the Castle Lake debris dam, Mount St. Helens, Washington, and implications for dam stability against heave

    USGS Publications Warehouse

    Roeloffs, Evelyn A.

    1994-01-01

    A numerical simulation of the ground-water flow system in the Castle Lake debris dam, calibrated to data from the 1991 and 1992 water years, was used to estimate factors of safety against heave and internal erosion. The Castle Lake debris dam, 5 miles northwest of the summit of Mount St. Helens, impounds 19,000 acre-ft of water that could pose a flood hazard in the event of a lake breakout. A new topographic map of the Castle Lake area prior to the 1980 eruption of Mount St. Helens was prepared and used to calculate the thickness of the debris avalanche deposits that compose the dam. Water levels in 22 piezometers and discharges from seeps on the dam face measured several times per year beginning in 1990 supplemented measurements in 11 piezometers and less frequent seep discharge measurements made since 1983. Observations in one group of piezometers reveal heads above the land surface and head gradients favoring upward flow that correspond to factors of safety only slightly greater than 2. The steady-state ground-water flow system in the debris dam was simulated using a threedimensional finite difference computer program. A uniform, isotropic model having the same shape as the dam and a hydraulic conductivity of 1.55 ft/day simulates the correct water level at half the observation points, but is in error by 10 ft or more at other points. Spatial variations of hydraulic conductivity were required to calibrate the model. The model analysis suggests that ground water flows in both directions between the debris dam and Castle Lake. Factors of safety against heave and internal erosion were calculated where the model simulated upward flow of ground water. A critical gradient analysis yields factors of safety as low as 2 near the piezometers where water level observations indicate low factors of safety. Low safety factors are also computed near Castle Creek where slumping was caused by a storm in January, 1990. If hydraulic property contrasts are present in areas of the debris dam unsampled by piezometers, then low safety factors may exist that are not evident in the numerical model analysis. Numerical model simulations showed that lowering Castle Lake by 40 feet increases many factors of safety by 0.1, but increases greater than 1 are limited to the area of 1990 slumping.

  9. Evaluating the effects of dam breach methodologies on Consequence Estimation through Sensitivity Analysis

    NASA Astrophysics Data System (ADS)

    Kalyanapu, A. J.; Thames, B. A.

    2013-12-01

    Dam breach modeling often includes application of models that are sophisticated, yet computationally intensive to compute flood propagation at high temporal and spatial resolutions. This results in a significant need for computational capacity that requires development of newer flood models using multi-processor and graphics processing techniques. Recently, a comprehensive benchmark exercise titled the 12th Benchmark Workshop on Numerical Analysis of Dams, is organized by the International Commission on Large Dams (ICOLD) to evaluate the performance of these various tools used for dam break risk assessment. The ICOLD workshop is focused on estimating the consequences of failure of a hypothetical dam near a hypothetical populated area with complex demographics, and economic activity. The current study uses this hypothetical case study and focuses on evaluating the effects of dam breach methodologies on consequence estimation and analysis. The current study uses ICOLD hypothetical data including the topography, dam geometric and construction information, land use/land cover data along with socio-economic and demographic data. The objective of this study is to evaluate impacts of using four different dam breach methods on the consequence estimates used in the risk assessments. The four methodologies used are: i) Froehlich (1995), ii) MacDonald and Langridge-Monopolis 1984 (MLM), iii) Von Thun and Gillete 1990 (VTG), and iv) Froehlich (2008). To achieve this objective, three different modeling components were used. First, using the HEC-RAS v.4.1, dam breach discharge hydrographs are developed. These hydrographs are then provided as flow inputs into a two dimensional flood model named Flood2D-GPU, which leverages the computer's graphics card for much improved computational capabilities of the model input. Lastly, outputs from Flood2D-GPU, including inundated areas, depth grids, velocity grids, and flood wave arrival time grids, are input into HEC-FIA, which provides the consequence assessment for the solution to the problem statement. For the four breach methodologies, a sensitivity analysis of four breach parameters, breach side slope (SS), breach width (Wb), breach invert elevation (Elb), and time of failure (tf), is conducted. Up to, 68 simulations are computed to produce breach hydrographs in HEC-RAS for input into Flood2D-GPU. The Flood2D-GPU simulation results were then post-processed in HEC-FIA to evaluate: Total Population at Risk (PAR), 14-yr and Under PAR (PAR14-), 65-yr and Over PAR (PAR65+), Loss of Life (LOL) and Direct Economic Impact (DEI). The MLM approach resulted in wide variability in simulated minimum and maximum values of PAR, PAR 65+ and LOL estimates. For PAR14- and DEI, Froehlich (1995) resulted in lower values while MLM resulted in higher estimates. This preliminary study demonstrated the relative performance of four commonly used dam breach methodologies and their impacts on consequence estimation.

  10. Fish Assemblage Response to a Small Dam Removal in the Eightmile River System, Connecticut, USA

    NASA Astrophysics Data System (ADS)

    Poulos, Helen M.; Miller, Kate E.; Kraczkowski, Michelle L.; Welchel, Adam W.; Heineman, Ross; Chernoff, Barry

    2014-11-01

    We examined the effects of the Zemko Dam removal on the Eightmile River system in Salem, Connecticut, USA. The objective of this research was to quantify spatiotemporal variation in fish community composition in response to small dam removal. We sampled fish abundance over a 6-year period (2005-2010) to quantify changes in fish assemblages prior to dam removal, during drawdown, and for three years following dam removal. Fish population dynamics were examined above the dam, below the dam, and at two reference sites by indicator species analysis, mixed models, non-metric multidimensional scaling, and analysis of similarity. We observed significant shifts in fish relative abundance over time in response to dam removal. Changes in fish species composition were variable, and they occurred within 1 year of drawdown. A complete shift from lentic to lotic fishes failed to occur within 3 years after the dam was removed. However, we did observe increases in fluvial and transition (i.e., pool head, pool tail, or run) specialist fishes both upstream and downstream from the former dam site. Our results demonstrate the importance of dam removal for restoring river connectivity for fish movement. While the long-term effects of dam removal remain uncertain, we conclude that dam removals can have positive benefits on fish assemblages by enhancing river connectivity and fluvial habitat availability.

  11. Fish assemblage response to a small dam removal in the Eightmile River system, Connecticut, USA.

    PubMed

    Poulos, Helen M; Miller, Kate E; Kraczkowski, Michelle L; Welchel, Adam W; Heineman, Ross; Chernoff, Barry

    2014-11-01

    We examined the effects of the Zemko Dam removal on the Eightmile River system in Salem, Connecticut, USA. The objective of this research was to quantify spatiotemporal variation in fish community composition in response to small dam removal. We sampled fish abundance over a 6-year period (2005-2010) to quantify changes in fish assemblages prior to dam removal, during drawdown, and for three years following dam removal. Fish population dynamics were examined above the dam, below the dam, and at two reference sites by indicator species analysis, mixed models, non-metric multidimensional scaling, and analysis of similarity. We observed significant shifts in fish relative abundance over time in response to dam removal. Changes in fish species composition were variable, and they occurred within 1 year of drawdown. A complete shift from lentic to lotic fishes failed to occur within 3 years after the dam was removed. However, we did observe increases in fluvial and transition (i.e., pool head, pool tail, or run) specialist fishes both upstream and downstream from the former dam site. Our results demonstrate the importance of dam removal for restoring river connectivity for fish movement. While the long-term effects of dam removal remain uncertain, we conclude that dam removals can have positive benefits on fish assemblages by enhancing river connectivity and fluvial habitat availability.

  12. Using supercomputers for the time history analysis of old gravity dams

    NASA Astrophysics Data System (ADS)

    Rouve, G.; Peters, A.

    Some of the old masonry dams that were built in Germany at the beginning of this century are a matter of concern today. In the course of time certain deterioration caused or amplified by aging has appeared and raised questions about the safety of these old dams. The Finite Element Method, which in the past two decades has found a widespread application, offers a suitable tool to re-evaluate the safety of these old gravity dams. The reliability of the results, however, strongly depends on the knowledge of the material parameters. Using historical records and observations a numerical back-analysis models has been developed to simulate the behaviour of these old masonry structures and to estimate their material properties by calibration. Only an implementation on a fourth generation vector computer made the application of this large model possible in practice.

  13. Integrated Flood Forecast and Virtual Dam Operation System for Water Resources and Flood Risk Management

    NASA Astrophysics Data System (ADS)

    Shibuo, Yoshihiro; Ikoma, Eiji; Lawford, Peter; Oyanagi, Misa; Kanauchi, Shizu; Koudelova, Petra; Kitsuregawa, Masaru; Koike, Toshio

    2014-05-01

    While availability of hydrological- and hydrometeorological data shows growing tendency and advanced modeling techniques are emerging, such newly available data and advanced models may not always be applied in the field of decision-making. In this study we present an integrated system of ensemble streamflow forecast (ESP) and virtual dam simulator, which is designed to support river and dam manager's decision making. The system consists of three main functions: real time hydrological model, ESP model, and dam simulator model. In the real time model, the system simulates current condition of river basins, such as soil moisture and river discharges, using LSM coupled distributed hydrological model. The ESP model takes initial condition from the real time model's output and generates ESP, based on numerical weather prediction. The dam simulator model provides virtual dam operation and users can experience impact of dam control on remaining reservoir volume and downstream flood under the anticipated flood forecast. Thus the river and dam managers shall be able to evaluate benefit of priori dam release and flood risk reduction at the same time, on real time basis. Furthermore the system has been developed under the concept of data and models integration, and it is coupled with Data Integration and Analysis System (DIAS) - a Japanese national project for integrating and analyzing massive amount of observational and model data. Therefore it has advantage in direct use of miscellaneous data from point/radar-derived observation, numerical weather prediction output, to satellite imagery stored in data archive. Output of the system is accessible over the web interface, making information available with relative ease, e.g. from ordinary PC to mobile devices. We have been applying the system to the Upper Tone region, located northwest from Tokyo metropolitan area, and we show application example of the system in recent flood events caused by typhoons.

  14. Importance of using roller compacted concrete in techno-economic investigation and design of small dams

    NASA Astrophysics Data System (ADS)

    Rouissat, Bouchrit; Smail, N.; Zenagui, S.

    2017-12-01

    In recent years, and under constraints caused by persistent drought, Algeria has launched a new mobilization strategy for surface water resources from small and medium dams. However, by making a review of the studies and achievements of twenty small dams in the west of Algeria, some deficiencies appeared. In addition to reservoir siltation assessment, operation spillways have been the major constraint on the reliability of these types of dams. The objective of this paper is to use the roller compacted concrete (RCC) for small dams' design for the benefit it offers and its ability to incorporate spillways. The development of this reflection was applied to the Khneg Azir earth dam situated in southwest of Algeria. Its uncontrolled lateral spillway has registered significant damage following the flood of October 2005, amounted, at that time, to more than 100 million Algerian dinars (1 million US Dollars). The present research encompasses a technical and economical comparative analysis concerning multiple criteria dam design types coupled with the conjugation of the spillways. Thus, on the basis of financial estimates calculated for all design types, the variant RCC remains competitive with that of the earth dam's spillway isolated (Less than 40% of the cost). To assess the mechanical behavior of the foundations for both types of dams, (earth and RCC dams), numerical modeling has been undertaken, according to the comparative analysis of deformations in the foundations. Analysis of deformations showed that the average foundation deformations was between (0.052-0.85) m for earth dam and (0.023-0.373) m for RCC dam. These economical and technical considerations open up important prospects for the use of RCC in the design of small dams.

  15. Influence of groundwater pumping on streamflow restoration following upstream dam removal

    USGS Publications Warehouse

    Constantz, J.; Essaid, H.

    2007-01-01

    We compared streamflow in basins under the combined impacts of an upland dam and groundwater pumping withdrawals, by examining streamflow in the presence and absence of each impact. As a qualitative analysis, inter-watersbed streamflow comparisons were performed for several rivers flowing into the east side of the Central Valley, CA. Results suggest that, in the absence of upland dams supporting large reservoirs, some reaches of these rivers might develop ephemeral streamflow in late summer. As a quantitative analysis, we conducted a series of streamflow/ groundwater simulations (using MODFLOW-2000 plus the streamflow routing package, SFR1) for a representative hypothetical watershed, with an upland dam and groundwater pumping in the downstream basin, under humid, semi-arid, and and conditions. As a result of including the impact of groundwater pumping, post-dam removal simulated streamflow was significantly less than natural streamflow. The model predicts extensive ephemeral conditions in the basin during September for both the arid and semi-arid cases. The model predicts continued perennial conditions in the humid case, but spatially weighted, average streamflow of only 71% of natural September streamflow, as a result of continued pumping after dam removal.

  16. How far downstream do dams impact streamflow?

    NASA Astrophysics Data System (ADS)

    Troy, T.

    2017-12-01

    Water infrastructure can be a double-edged sword. For example, dams can provide significant flood protection and stable water supplies, but they negatively impact river ecosystems. As the United States enters an era of dam decommissioning instead of dam building, it raises the question of how far downstream dams provide protection against flood peaks and sustaining environmental flows. This study uses USGS streamflow observations, the National Inventory of Dams, and VIC-modeled streamflow as a proxy for naturalized streamflow to evaluate the scale at which dams impact a variety of hydrologic signatures such as flood return period flows, streamflow variability, and low flows. Results over the Delaware River show that the impact of dams quickly dissipates as one moves downstream, but this is due to the basin's characteristics. This analysis is performed over the contiguous United States, quantifying the length scale of impact as a function of dam capacity, position on the river network, and the hydroclimatology.

  17. Seismic damage analysis of the outlet piers of arch dams using the finite element sub-model method

    NASA Astrophysics Data System (ADS)

    Song, Liangfeng; Wu, Mingxin; Wang, Jinting; Xu, Yanjie

    2016-09-01

    This study aims to analyze seismic damage of reinforced outlet piers of arch dams by the nonlinear finite element (FE) sub-model method. First, the dam-foundation system is modeled and analyzed, in which the effects of infinite foundation, contraction joints, and nonlinear concrete are taken into account. The detailed structures of the outlet pier are then simulated with a refined FE model in the sub-model analysis. In this way the damage mechanism of the plain (unreinforced) outlet pier is analyzed, and the effects of two reinforcement measures (i.e., post-tensioned anchor cables and reinforcing bar) on the dynamic damage to the outlet pier are investigated comprehensively. Results show that the plain pier is damaged severely by strong earthquakes while implementation of post-tensioned anchor cables strengthens the pier effectively. In addition, radiation damping strongly alleviates seismic damage to the piers.

  18. Three-dimensional earthquake analysis of roller-compacted concrete dams

    NASA Astrophysics Data System (ADS)

    Kartal, M. E.

    2012-07-01

    Ground motion effect on a roller-compacted concrete (RCC) dams in the earthquake zone should be taken into account for the most critical conditions. This study presents three-dimensional earthquake response of a RCC dam considering geometrical non-linearity. Besides, material and connection non-linearity are also taken into consideration in the time-history analyses. Bilinear and multilinear kinematic hardening material models are utilized in the materially non-linear analyses for concrete and foundation rock respectively. The contraction joints inside the dam blocks and dam-foundation-reservoir interaction are modeled by the contact elements. The hydrostatic and hydrodynamic pressures of the reservoir water are modeled with the fluid finite elements based on the Lagrangian approach. The gravity and hydrostatic pressure effects are employed as initial condition before the strong ground motion. In the earthquake analyses, viscous dampers are defined in the finite element model to represent infinite boundary conditions. According to numerical solutions, horizontal displacements increase under hydrodynamic pressure. Besides, those also increase in the materially non-linear analyses of the dam. In addition, while the principle stress components by the hydrodynamic pressure effect the reservoir water, those decrease in the materially non-linear time-history analyses.

  19. Characteristics of the first stage of constructing the Hoabinh Dam in Vietnam

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bogachenko, P.T.; Godunov, B.I.; Phunc Ne, T.

    1985-06-01

    As a result of an analysis of the data, investigations, and on-site observations at the Hoa-Binh Dam, Vietnam, the authors conclude: infilling of the rock mass with sand, successful for the Aswan dam, cannot be mechanically transferred to other dams; the possibility of using the energy of the river flow for removing low-quality soils in large amounts from the foundation of rock-fill dams by regulating the sequence of dumping the elements of the dam was confirmed in model investigations and successfully accomplished in the construction of the HoaBinh dam; at the site of the Hoa-Binh dam, observations of the dumpingmore » of the sand-gravel soil into water into a high shoulder did not reveal segregation of this soil, however, the data from investigations in a single borehole contradict the observations -- further on-site observation must therefore be made.« less

  20. Preliminary study of the water-temperature regime of the North Santiam River downstream from Detroit and Big Cliff dams, Oregon

    USGS Publications Warehouse

    Laenen, Antonius

    1985-01-01

    A riverine-temperature model and associated data-collection system were developed to help the Corps of engineers determine cost benefits of selective-withdrawal structures for future use with dams on the Willamette River System. A U.S. Geological Survey Lagrangian reference frame, digital computer model was used to simulate stream temperatures on the North Santiam River downstream of the multipurpose Detroit dam and a reregulating dam (Big Cliff), from river mile 45.6 to 2.9. In simulation, only available air-temperature and windspeed information from a nearby National Weather Service station at Salem, Oregon were used. This preliminary investigation found that the model predicted mean daily temperatures to within 0.4 C standard deviation. Analysis of projected selective-withdrawal scenarios showed that the model has the sensitivity to indicate water-temperature changes 42.7 miles downstream on the North Santiam River. (USGS)

  1. Advances on the Failure Analysis of the Dam-Foundation Interface of Concrete Dams.

    PubMed

    Altarejos-García, Luis; Escuder-Bueno, Ignacio; Morales-Torres, Adrián

    2015-12-02

    Failure analysis of the dam-foundation interface in concrete dams is characterized by complexity, uncertainties on models and parameters, and a strong non-linear softening behavior. In practice, these uncertainties are dealt with a well-structured mixture of experience, best practices and prudent, conservative design approaches based on the safety factor concept. Yet, a sound, deep knowledge of some aspects of this failure mode remain unveiled, as they have been offset in practical applications by the use of this conservative approach. In this paper we show a strategy to analyse this failure mode under a reliability-based approach. The proposed methodology of analysis integrates epistemic uncertainty on spatial variability of strength parameters and data from dam monitoring. The purpose is to produce meaningful and useful information regarding the probability of occurrence of this failure mode that can be incorporated in risk-informed dam safety reviews. In addition, relationships between probability of failure and factors of safety are obtained. This research is supported by a more than a decade of intensive professional practice on real world cases and its final purpose is to bring some clarity, guidance and to contribute to the improvement of current knowledge and best practices on such an important dam safety concern.

  2. Modeling Streamflow and Water Temperature in the North Santiam and Santiam Rivers, Oregon, 2001-02

    USGS Publications Warehouse

    Sullivan, Annett B.; Roundsk, Stewart A.

    2004-01-01

    To support the development of a total maximum daily load (TMDL) for water temperature in the Willamette Basin, the laterally averaged, two-dimensional model CE-QUAL-W2 was used to construct a water temperature and streamflow model of the Santiam and North Santiam Rivers. The rivers were simulated from downstream of Detroit and Big Cliff dams to the confluence with the Willamette River. Inputs to the model included bathymetric data, flow and temperature from dam releases, tributary flow and temperature, and meteorologic data. The model was calibrated for the period July 1 through November 21, 2001, and confirmed with data from April 1 through October 31, 2002. Flow calibration made use of data from two streamflow gages and travel-time and river-width data. Temperature calibration used data from 16 temperature monitoring locations in 2001 and 5 locations in 2002. A sensitivity analysis was completed by independently varying input parameters, including point-source flow, air temperature, flow and water temperature from dam releases, and riparian shading. Scenario analyses considered hypothetical river conditions without anthropogenic heat inputs, with restored riparian vegetation, with minimum streamflow from the dams, and with a more-natural seasonal water temperature regime from dam releases.

  3. Dam failure analysis for the Lago de Matrullas Dam, Orocovis, Puerto Rico

    USGS Publications Warehouse

    Torres-Sierra, Heriberto; Gómez-Fragoso, Julieta

    2015-01-01

    Results from the simulated dam failure of the Lago de Matrullas Dam using the HEC–RAS model for the 6- and 24-hour PMP events showed peak discharges at the dam of 3,149.33 and 3,604.70 m3/s, respectively. Dam failure during the 100-year-recurrence, 24-hour rainfall event resulted in a peak discharge of 2,103.12 m3/s directly downstream from the dam. Dam failure under sunny day conditions produced a peak discharge of 1,695.91 m3/s at the dam assuming the antecedent lake level was at the morning-glory spillway invert elevation. Flood-inundation maps prepared as part of the study depict the flood extent and provide valuable information for preparing an Emergency Action Plan. Results of the failure analysis indicate that a failure of the Lago de Matrullas Dam could cause flooding to many of the inhabited areas along stream banks from the Lago de Matrullas Dam to the mouth of the Río Grande de Manatí. Among the areas most affected are the low-lying regions in the vicinity of the towns of Ciales, Manatí, and Barceloneta. The delineation of the flood boundaries near the town of Barceloneta considered the effects of a levee constructed during 2000 at Barceloneta in the flood plain of the Río Grande de Manatí to provide protection against flooding to the near-by low-lying populated areas. The results showed overtopping can be expected in the aforementioned levee during 6- and 24-hour probable-maximum-precipitation dam failure scenarios. No overtopping of the levee was simulated, however, during dam failure scenarios under the 100-year recurrence, 24-hour rainfall event or sunny day conditions.

  4. Dynamic decision making for dam-break emergency management - Part 1: Theoretical framework

    NASA Astrophysics Data System (ADS)

    Peng, M.; Zhang, L. M.

    2013-02-01

    An evacuation decision for dam breaks is a very serious issue. A late decision may lead to loss of lives and properties, but a very early evacuation will incur unnecessary expenses. This paper presents a risk-based framework of dynamic decision making for dam-break emergency management (DYDEM). The dam-break emergency management in both time scale and space scale is introduced first to define the dynamic decision problem. The probability of dam failure is taken as a stochastic process and estimated using a time-series analysis method. The flood consequences are taken as functions of warning time and evaluated with a human risk analysis model (HURAM) based on Bayesian networks. A decision criterion is suggested to decide whether to evacuate the population at risk (PAR) or to delay the decision. The optimum time for evacuating the PAR is obtained by minimizing the expected total loss, which integrates the time-related probabilities and flood consequences. When a delayed decision is chosen, the decision making can be updated with available new information. A specific dam-break case study is presented in a companion paper to illustrate the application of this framework to complex dam-breaching problems.

  5. Numerical modelling of glacial lake outburst floods using physically based dam-breach models

    NASA Astrophysics Data System (ADS)

    Westoby, M. J.; Brasington, J.; Glasser, N. F.; Hambrey, M. J.; Reynolds, J. M.; Hassan, M. A. A. M.; Lowe, A.

    2015-03-01

    The instability of moraine-dammed proglacial lakes creates the potential for catastrophic glacial lake outburst floods (GLOFs) in high-mountain regions. In this research, we use a unique combination of numerical dam-breach and two-dimensional hydrodynamic modelling, employed within a generalised likelihood uncertainty estimation (GLUE) framework, to quantify predictive uncertainty in model outputs associated with a reconstruction of the Dig Tsho failure in Nepal. Monte Carlo analysis was used to sample the model parameter space, and morphological descriptors of the moraine breach were used to evaluate model performance. Multiple breach scenarios were produced by differing parameter ensembles associated with a range of breach initiation mechanisms, including overtopping waves and mechanical failure of the dam face. The material roughness coefficient was found to exert a dominant influence over model performance. The downstream routing of scenario-specific breach hydrographs revealed significant differences in the timing and extent of inundation. A GLUE-based methodology for constructing probabilistic maps of inundation extent, flow depth, and hazard is presented and provides a useful tool for communicating uncertainty in GLOF hazard assessment.

  6. Assessing potential removal of low-head dams in urban settings: an example from the Ottawa River, NW Ohio.

    PubMed

    Roberts, Sheila J; Gottgens, Johan F; Spongberg, Alison L; Evans, James E; Levine, Norman S

    2007-01-01

    This is a study of the scientific component of an effort to restore an urban river by removing a low-head dam. The Secor Dam is owned by a local government entity near Toledo, Ohio. The proposed removal of the last structure impeding flow on the Ottawa River has broad appeal, but the owner is concerned about liability issues, particularly potential changes to the flood regime, the presence of contaminated sediments behind the dam, and possible downstream transport of reservoir sediments. Assessing sediment contamination involved sediment sampling and analysis of trace metals and organic contaminants. Forecasting sediment transport involved field methods to determine the volume and textural properties of reservoir and upstream sediment and calculations to determine the fate of reservoir sediments. Forecasting changes in the flood regime involved HEC-RAS hydrological models to determine before and after dam removal flood scenarios using LiDAR data imported into an ArcGIS database. The resulting assessment found potential sediment contamination to be minor, and modeling showed that the removal of the dam would have minimal impacts on sediment transport and flood hazards. Based on the assessment, the removal of the dam has been approved by its owners.

  7. Tailings dams stability analysis using numerical modelling of geotechnical and geophysical data

    NASA Astrophysics Data System (ADS)

    Mihai, S.; Zlagnean, M.; Oancea, I.; Petrescu, A.

    2009-04-01

    Methods for monitoring seepage and detecting internal erosion are essential for the safety evaluation of embankment dams. Internal erosion is one of the major reasons for embankment dam failures, and there are thousands of large tailings dams and waste-rock dumps in the world that may pe considered as hotspots for environmental impact. In this research the geophysical survey works were performed on Cetatuia 2 tailings dam. Electrical resistivity imaging (ERI) method was able to detect spatially anomalous zones inside the embankment dam. These anomalies are the results of internal erosion phenomena which may progressing inside the dam and is difficult to detect by conventional methods. Data aquired by geophysical survey together with their interpretations were used in the numerical model for slope stability assessment. The final results show us the structural weakness induced by the presence of internal erosion elements especially for seismic loading case. This research methodology may be also available for tailings dam monitoring purposes. Electrical Rezistivity Imaging (ERI) was performed on Cetatuia 2 dam at the Uranium Milling Plant Feldioara, in order to map areas with lateral and vertical changes in resistivity. The electrodes are connected to an automated computer operated switch box that selects the 4 electrodes to be used. A computer controls the switch box and the measuring device, and runs a program that selects the electrodes, makes the measurement, and stores the measurement. For inversion processing procedures was used Res2Din software. The measured resistivity were plotted by the pseudo section contouring method. There are five resistivity pseudosections obtained from the Cetatuia 2 tailings dam during the october 2007 measurements. Four transversal profiles trans1 to trans4 are perpendicular to the berms and the longitudinal one long1 is placed along dam's crest. The high resistivities near the berms surfaces corresponds to unsaturated fill materials and the low resistivities near the crest correspond to water saturated material. The resistivities values greater then 80 ohm.m may be explained by some error obtained for that inversion model. Profiles trans3 and trans4 were measured on perpendicular directions to berm alignment and show two distinct zones. The upward low resistivities zone correspond to water saturated materials especially from the compacted clay dam's core and the downward high resistivities zone belongs to unsaturated fill materials. The boundary between high and low resistivity at the depth of about 5 to 7 meters shows the groundwater level. The continuation of the high resistivity zones towards the end of the profile trans3, which is different from other profiles is probably due to the presence of dry coarse materials in shallow depth correspondingly to sandy clay. The sand fractions from the clay matrix may be affected by internal erosional phenomena, due to seepage currents that overpassed the material critical gradient. In this case the relative high resistivities values were considered as a presumptive erosional pattern. This profile was considered for the slope stability finite element modelling. The profile long1 which is placed along dam's crest is the longest profiles and extends up to nearly 420 m. The boundary between high and low resistivity at the depth of about 4 to 8 meters shows the groundwater across the dam core. The central part of the profile (about meter 200) shows the same relative high resistivities that occurred on transversal profile trans3. Resistivity data was used for building the 3D electrical resistivity model. The water saturated materials have locations very close to dam's crest (resistivity values usually lower then 10 ohm.m) and on both dam's arms. The groundwater levels were confirmed by the piezometric measurements. Electrical Rezistivity Imaging method had the possibility to show the most important disturbant elements that in certain conditions may weak the dam's state of safety. This study considered the SSR (Shear Strength Reduction) technique for slope stability numerical modelling. In the SSR finite element technique, elasto-plastic strength is assumed for dam's materials and shear strengths are progressively reduced until collapse occurs. Numerical modelling was performed on the most critical profile choosed through analysis of geophysical and geotechnical informational volume achieved by insitu or in laboratory tests. Finite element analysis were considered in two situations: first, before geophysical investigations and second considering the whole informational of data achieved. Both situations were analysed in static and pseudo-static conditions. The factor of safety before geophysical investigations is high enough to describe a stable state of stability even for the seismic load. The total displacement distributions were modified by the presence of internal erosional element giving a high state of instability, especially for the pseudo-static case. These analysis using the finite element method prove the importance of structural disturbance elements that may occure inside the dam body produced by internal erosional processes.

  8. WinDAM C earthen embankment internal erosion analysis software

    USDA-ARS?s Scientific Manuscript database

    Two primary causes of dam failure are overtopping and internal erosion. For the purpose of evaluating dam safety for existing earthen embankment dams and proposed earthen embankment dams, Windows Dam Analysis Modules C (WinDAM C) software will simulate either internal erosion or erosion resulting f...

  9. Hydro-geomorphology of the middle Elwha River, Washington, following dam removal

    NASA Astrophysics Data System (ADS)

    Morgan, J. A.; Nelson, P. A.; Brogan, D. J.

    2017-12-01

    Dam removal is an increasingly common river restoration practice, which can produce dramatic increases in sediment supply to downstream reaches. There remains, however, considerable uncertainty in how mesoscale morphological units (e.g., riffles and pools) respond to the flow and sediment supply changes associated with dam removal. The recent removal of Glines Canyon Dam on the Elwha River in Washington State provides a natural setting to explore how increased sediment supply due to dam removal may affect downstream reaches. Here, we present observations and surveys documenting how a 1 km reach, located approximately 5 km downstream of the former dam site, has evolved following dam removal. Annual topographic/bathymetric surveys were conducted in 2014-2016 using RTK-GNSS methods, and these surveys were coupled with airborne lidar to create continuous surface maps of the valley bottom. Differencing the elevation models reveals channel widening and migration due to lateral bank retreat and bar aggradation. Analysis of aerial imagery dating back to 1939 suggests that rates of both widening and meander migration have increased following dam removal. We also used results from depth-averaged hydrodynamic modeling with a fuzzy c-means clustering approach to delineate riffle and pool units; this analysis suggests that both riffles and pools stayed relatively consistent from 2014-2015, while both areas decreased from 2015 to 2016. Without any considerable changes to the hydrologic regime these higher rates of change are implied to be the result of the increased sediment supply. Our results, which indicate an increased dynamism due directly to the amplified sediment supply, have the potential to further inform river managers and restoration specialists who oversee projects related to changing sediment regimes.

  10. Key Impact Factors on Dam Break Fatalities

    NASA Astrophysics Data System (ADS)

    Huang, D.; Yu, Z.; Song, Y.; Han, D.; Li, Y.

    2016-12-01

    Dam failures can lead to catastrophes on human society. However, there is a lack of research about dam break fatalities, especially on the key factors that affect fatalities. Based on the analysis of historical dam break cases, most studies have used the regression analysis to explore the correlation between those factors and fatalities, but without implementing optimization to find the dominating factors. In order to understand and reduce the risk of fatalities, this study has proposed a new method to select the impact factors on the fatality. It employs an improved ANN (Artificial Neural Network) combined with LOOCV (Leave-one-out cross-validation) and SFS (Stepwise Forward Selection) approach to explore the nonlinear relationship between impact factors and life losses. It not only considers the factors that have been widely used in the literature but also introduces new factors closely involved with fatalities. Dam break cases occurred in China from 1954 to 2013 are summarized, within which twenty-five cases are selected with a comprehensive coverage of geographic position and temporal variation. Twelve impact factors are taken into account as the inputs, i.e., severity of dam break flood (SF), population at risk (PR), public understanding of dam break (UB), warning time (TW), evacuation condition (EC), weather condition during dam break (WB), dam break mode (MB), water storage (SW), building vulnerability (VB), dam break time (TB), average distance from the affected area to the dam (DD) and preventive measures by government (PG).From those, three key factors of SF, MB and TB are chosen. The proposed method is able to extract the key factors, and the derived fatality model performs well in various types of dam break conditions.

  11. Trading-off fish biodiversity, food security, and hydropower in the Mekong River Basin.

    PubMed

    Ziv, Guy; Baran, Eric; Nam, So; Rodríguez-Iturbe, Ignacio; Levin, Simon A

    2012-04-10

    The Mekong River Basin, site of the biggest inland fishery in the world, is undergoing massive hydropower development. Planned dams will block critical fish migration routes between the river's downstream floodplains and upstream tributaries. Here we estimate fish biomass and biodiversity losses in numerous damming scenarios using a simple ecological model of fish migration. Our framework allows detailing trade-offs between dam locations, power production, and impacts on fish resources. We find that the completion of 78 dams on tributaries, which have not previously been subject to strategic analysis, would have catastrophic impacts on fish productivity and biodiversity. Our results argue for reassessment of several dams planned, and call for a new regional agreement on tributary development of the Mekong River Basin.

  12. The application of dam break monitoring based on BJ-2 images

    NASA Astrophysics Data System (ADS)

    Cui, Yan; Li, Suju; Wu, Wei; Liu, Ming

    2018-03-01

    Flood is one of the major disasters in China. There are heavy intensity and wide range rainstorm during flood season in eastern part of China, and the flood control capacity of rivers is lower somewhere, so the flood disaster is abrupt and caused lots of direct economic losses. In this paper, based on BJ-2 Spatio-temporal resolution remote sensing data, reference image, 30-meter Global Land Cover Dataset(GlobeLand 30) and basic geographic data, forming Dam break monitoring model which including BJ-2 date processing sub-model, flood inundation range monitoring sub-model, dam break change monitoring sub-model and crop inundation monitoring sub-model. Case analysis in Poyang County Jiangxi province in 20th, Jun, 2016 show that the model has a high precision and could monitoring flood inundation range, crops inundation range and breach.

  13. Advances on the Failure Analysis of the Dam—Foundation Interface of Concrete Dams

    PubMed Central

    Altarejos-García, Luis; Escuder-Bueno, Ignacio; Morales-Torres, Adrián

    2015-01-01

    Failure analysis of the dam-foundation interface in concrete dams is characterized by complexity, uncertainties on models and parameters, and a strong non-linear softening behavior. In practice, these uncertainties are dealt with a well-structured mixture of experience, best practices and prudent, conservative design approaches based on the safety factor concept. Yet, a sound, deep knowledge of some aspects of this failure mode remain unveiled, as they have been offset in practical applications by the use of this conservative approach. In this paper we show a strategy to analyse this failure mode under a reliability-based approach. The proposed methodology of analysis integrates epistemic uncertainty on spatial variability of strength parameters and data from dam monitoring. The purpose is to produce meaningful and useful information regarding the probability of occurrence of this failure mode that can be incorporated in risk-informed dam safety reviews. In addition, relationships between probability of failure and factors of safety are obtained. This research is supported by a more than a decade of intensive professional practice on real world cases and its final purpose is to bring some clarity, guidance and to contribute to the improvement of current knowledge and best practices on such an important dam safety concern. PMID:28793709

  14. Modeling the capacity of riverscapes to support beaver dams

    NASA Astrophysics Data System (ADS)

    Macfarlane, William W.; Wheaton, Joseph M.; Bouwes, Nicolaas; Jensen, Martha L.; Gilbert, Jordan T.; Hough-Snee, Nate; Shivik, John A.

    2017-01-01

    The construction of beaver dams facilitates a suite of hydrologic, hydraulic, geomorphic, and ecological feedbacks that increase stream complexity and channel-floodplain connectivity that benefit aquatic and terrestrial biota. Depending on where beaver build dams within a drainage network, they impact lateral and longitudinal connectivity by introducing roughness elements that fundamentally change the timing, delivery, and storage of water, sediment, nutrients, and organic matter. While the local effects of beaver dams on streams are well understood, broader coverage network models that predict where beaver dams can be built and highlight their impacts on connectivity across diverse drainage networks are lacking. Here we present a capacity model to assess the limits of riverscapes to support dam-building activities by beaver across physiographically diverse landscapes. We estimated dam capacity with freely and nationally-available inputs to evaluate seven lines of evidence: (1) reliable water source, (2) riparian vegetation conducive to foraging and dam building, (3) vegetation within 100 m of edge of stream to support expansion of dam complexes and maintain large colonies, (4) likelihood that channel-spanning dams could be built during low flows, (5) the likelihood that a beaver dam is likely to withstand typical floods, (6) a suitable stream gradient that is neither too low to limit dam density nor too high to preclude the building or persistence of dams, and (7) a suitable river that is not too large to restrict dam building or persistence. Fuzzy inference systems were used to combine these controlling factors in a framework that explicitly also accounts for model uncertainty. The model was run for 40,561 km of streams in Utah, USA, and portions of surrounding states, predicting an overall network capacity of 356,294 dams at an average capacity of 8.8 dams/km. We validated model performance using 2852 observed dams across 1947 km of streams. The model showed excellent agreement with observed dam densities where beaver dams were present. Model performance was spatially coherent and logical, with electivity indices that effectively segregated capacity categories. That is, beaver dams were not found where the model predicted no dams could be supported, beaver avoided segments that were predicted to support rare or occasional densities, and beaver preferentially occupied and built dams in areas predicted to have pervasive dam densities. The resulting spatially explicit reach-scale (250 m long reaches) data identifies where dam-building activity is sustainable, and at what densities dams can occur across a landscape. As such, model outputs can be used to determine where channel-floodplain and wetland connectivity are likely to persist or expand by promoting increases in beaver dam densities.

  15. Quantifying and Generalizing Hydrologic Responses to Dam Regulation using a Statistical Modeling Approach

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McManamay, Ryan A

    2014-01-01

    Despite the ubiquitous existence of dams within riverscapes, much of our knowledge about dams and their environmental effects remains context-specific. Hydrology, more than any other environmental variable, has been studied in great detail with regard to dam regulation. While much progress has been made in generalizing the hydrologic effects of regulation by large dams, many aspects of hydrology show site-specific fidelity to dam operations, small dams (including diversions), and regional hydrologic regimes. A statistical modeling framework is presented to quantify and generalize hydrologic responses to varying degrees of dam regulation. Specifically, the objectives were to 1) compare the effects ofmore » local versus cumulative dam regulation, 2) determine the importance of different regional hydrologic regimes in influencing hydrologic responses to dams, and 3) evaluate how different regulation contexts lead to error in predicting hydrologic responses to dams. Overall, model performance was poor in quantifying the magnitude of hydrologic responses, but performance was sufficient in classifying hydrologic responses as negative or positive. Responses of some hydrologic indices to dam regulation were highly dependent upon hydrologic class membership and the purpose of the dam. The opposing coefficients between local and cumulative-dam predictors suggested that hydrologic responses to cumulative dam regulation are complex, and predicting the hydrology downstream of individual dams, as opposed to multiple dams, may be more easy accomplished using statistical approaches. Results also suggested that particular contexts, including multipurpose dams, high cumulative regulation by multiple dams, diversions, close proximity to dams, and certain hydrologic classes are all sources of increased error when predicting hydrologic responses to dams. Statistical models, such as the ones presented herein, show promise in their ability to model the effects of dam regulation effects at large spatial scales as to generalize the directionality of hydrologic responses.« less

  16. Geologic and Seismologic Investigation

    DTIC Science & Technology

    1988-12-01

    Descriptions, Hidden and Buchanan Dams 4 1.6.1 Hidden Dam 4 1.6.2 Buchanan Dam 5 2 TECTONIC SETTING 2.1 General 7 2.2 Cretaceous-Cenozoic Tectonic ...Activity 7 2.2.1 Cretaceous-Paleogene 8 2.2.2 Neogene 9 2.2.3 Late Cenozoic Tectonic Model 9 3 REGIONAL GEOLOGY 3.1 General 11 3.2 Geologic Units 11...detected by the imagery analysis which indicates there has been no tectonic movement from about 100,000 to 400,000 years ago to the present. The field

  17. Dam removal: Listening in

    NASA Astrophysics Data System (ADS)

    Foley, M. M.; Bellmore, J. R.; O'Connor, J. E.; Duda, J. J.; East, A. E.; Grant, G. E.; Anderson, C. W.; Bountry, J. A.; Collins, M. J.; Connolly, P. J.; Craig, L. S.; Evans, J. E.; Greene, S. L.; Magilligan, F. J.; Magirl, C. S.; Major, J. J.; Pess, G. R.; Randle, T. J.; Shafroth, P. B.; Torgersen, C. E.; Tullos, D.; Wilcox, A. C.

    2017-07-01

    Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam-removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal tends to quickly reestablish connectivity, restoring the movement of material and organisms between upstream and downstream river reaches; (4) geographic context, river history, and land use significantly influence river restoration trajectories and recovery potential because they control broader physical and ecological processes and conditions; and (5) quantitative modeling capability is improving, particularly for physical and broad-scale ecological effects, and gives managers information needed to understand and predict long-term effects of dam removal on riverine ecosystems. Although these studies collectively enhance our understanding of how riverine ecosystems respond to dam removal, knowledge gaps remain because most studies have been short (< 5 years) and do not adequately represent the diversity of dam types, watershed conditions, and dam-removal methods in the U.S.

  18. Dam removal: Listening in

    USGS Publications Warehouse

    Foley, Melissa M.; Bellmore, James; O'Connor, James E.; Duda, Jeff; East, Amy E.; Grant, Gordon G.; Anderson, Chauncey; Bountry, Jennifer A.; Collins, Mathias J.; Connolly, Patrick J.; Craig, Laura S.; Evans, James E.; Greene, Samantha; Magilligan, Francis J.; Magirl, Christopher S.; Major, Jon J.; Pess, George R.; Randle, Timothy J.; Shafroth, Patrick B.; Torgersen, Christian E.; Tullos, Desiree D.; Wilcox, Andrew C.

    2017-01-01

    Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam-removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal tends to quickly reestablish connectivity, restoring the movement of material and organisms between upstream and downstream river reaches; (4) geographic context, river history, and land use significantly influence river restoration trajectories and recovery potential because they control broader physical and ecological processes and conditions; and (5) quantitative modeling capability is improving, particularly for physical and broad-scale ecological effects, and gives managers information needed to understand and predict long-term effects of dam removal on riverine ecosystems. Although these studies collectively enhance our understanding of how riverine ecosystems respond to dam removal, knowledge gaps remain because most studies have been short (< 5 years) and do not adequately represent the diversity of dam types, watershed conditions, and dam-removal methods in the U.S.

  19. Trading-off fish biodiversity, food security, and hydropower in the Mekong River Basin

    PubMed Central

    Ziv, Guy; Baran, Eric; Nam, So; Rodríguez-Iturbe, Ignacio; Levin, Simon A.

    2012-01-01

    The Mekong River Basin, site of the biggest inland fishery in the world, is undergoing massive hydropower development. Planned dams will block critical fish migration routes between the river's downstream floodplains and upstream tributaries. Here we estimate fish biomass and biodiversity losses in numerous damming scenarios using a simple ecological model of fish migration. Our framework allows detailing trade-offs between dam locations, power production, and impacts on fish resources. We find that the completion of 78 dams on tributaries, which have not previously been subject to strategic analysis, would have catastrophic impacts on fish productivity and biodiversity. Our results argue for reassessment of several dams planned, and call for a new regional agreement on tributary development of the Mekong River Basin. PMID:22393001

  20. Anthropogenic controls on geomorphic evolution of the Upper Missouri River

    NASA Astrophysics Data System (ADS)

    Benthem, A.; Skalak, K.; Schenk, E.; Hupp, C.; Galloway, J.; Nustad, R.

    2012-12-01

    The 70-mile free flowing Upper Missouri River reach is bounded upstream by the Garrison Dam and downstream by Lake Oahe. The Garrison Dam, which regulates flow into the reach, was completed in 1953; the Oahe Dam (which created Lake Oahe and the associated delta near Bismarck, ND) was completed in 1959. This reach is used for recreation, water supply, fisheries, and as habitat for threatened and endangered species. The Upper Missouri River regularly (approximately every two years) received annual peak flows above 100,000 cubic feet per second (cfs) prior to the completion of the Garrison Dam. Annual peak flows consistently have been between 30,000 and 45,000 cfs following dam completion. The largest flood since dam regulation occurred in 2011 following an abnormally high snow pack season and a week-long rain event in the headwaters. Flood releases from the Garrison Dam began in May 2011 and peaked in June with a flow of approximately 150,000 cfs. The peak flow was sustained for two weeks. The dam releases have had a discernible impact on the Missouri River throughout this section. The 2011 flood has highlighted the critical need for quantifying the complex interaction between the regional geomorphology and human activities. It is necessary to first understand and quantify the historical impacts of the dams in order to determine the impact of the 2011 flood on channel planform, morphology, and sediment dynamics. We have created a spatial-temporal conceptual model of the governing fluvial and deltaic processes for the reach. Methods used for the development of the conceptual model include interpretation of repeat aerial photography, historical streamgage data, historical cross-sectional surveys, in addition to ground-truthing data with sediment cores, channel surveys, and dendrogeomorphic tools. Preliminary results indicate that prior to the 2011 flood the reach had achieved a dynamic equilibrium in response to dam closure and subsequent managed flows. The perturbation from the dam closure attenuated over approximately a 30-year period. Cross-sectional analysis indicates the reach just below the Garrison Dam increased in capacity over this period and the lower end of the reach (just upstream of the delta) either maintained capacity or experienced a reduction. Analysis of channel planform through repeat aerial photography suggests channel adjustment of varying types and degrees. Loss of islands and erosion has occurred in the 20 miles just below the dam; the next 30 miles have generally remained metastable and many islands in the remaining 20 miles of the river have become bank-attached. Loss of conveyance and increased frequency and growth of islands has occurred in the delta above the reservoir. However, the Upper Missouri River is still responding to the historic flood of 2011 and analysis is ongoing.

  1. Empirical and semi-analytical models for predicting peak outflows caused by embankment dam failures

    NASA Astrophysics Data System (ADS)

    Wang, Bo; Chen, Yunliang; Wu, Chao; Peng, Yong; Song, Jiajun; Liu, Wenjun; Liu, Xin

    2018-07-01

    Prediction of peak discharge of floods has attracted great attention for researchers and engineers. In present study, nine typical nonlinear mathematical models are established based on database of 40 historical dam failures. The first eight models that were developed with a series of regression analyses are purely empirical, while the last one is a semi-analytical approach that was derived from an analytical solution of dam-break floods in a trapezoidal channel. Water depth above breach invert (Hw), volume of water stored above breach invert (Vw), embankment length (El), and average embankment width (Ew) are used as independent variables to develop empirical formulas of estimating the peak outflow from breached embankment dams. It is indicated from the multiple regression analysis that a function using the former two variables (i.e., Hw and Vw) produce considerably more accurate results than that using latter two variables (i.e., El and Ew). It is shown that the semi-analytical approach works best in terms of both prediction accuracy and uncertainty, and the established empirical models produce considerably reasonable results except the model only using El. Moreover, present models have been compared with other models available in literature for estimating peak discharge.

  2. Model analysis of check dam impacts on long-term sediment and water budgets in southeast Arizona, USA

    USGS Publications Warehouse

    Norman, Laura M.; Niraula, Rewati

    2016-01-01

    The objective of this study was to evaluate the effect of check dam infrastructure on soil and water conservation at the catchment scale using the Soil and Water Assessment Tool (SWAT). This paired watershed study includes a watershed treated with over 2000 check dams and a Control watershed which has none, in the West Turkey Creek watershed, Southeast Arizona, USA. SWAT was calibrated for streamflow using discharge documented during the summer of 2013 at the Control site. Model results depict the necessity to eliminate lateral flow from SWAT models of aridland environments, the urgency to standardize geospatial soils data, and the care for which modelers must document altering parameters when presenting findings. Performance was assessed using the percent bias (PBIAS), with values of ±2.34%. The calibrated model was then used to examine the impacts of check dams at the Treated watershed. Approximately 630 tons of sediment is estimated to be stored behind check dams in the Treated watershed over the 3-year simulation, increasing water quality for fish habitat. A minimum precipitation event of 15 mm was necessary to instigate the detachment of soil, sediments, or rock from the study area, which occurred 2% of the time. The resulting watershed model is useful as a predictive framework and decision-support tool to consider long-term impacts of restoration and potential for future restoration.

  3. Tailings dam-break flow - Analysis of sediment transport

    NASA Astrophysics Data System (ADS)

    Aleixo, Rui; Altinakar, Mustafa

    2015-04-01

    A common solution to store mining debris is to build tailings dams near the mining site. These dams are usually built with local materials such as mining debris and are more vulnerable than concrete dams (Rico et al. 2008). of The tailings and the pond water generally contain heavy metals and various toxic chemicals used in ore extraction. Thus, the release of tailings due to a dam-break can have severe ecological consequences in the environment. A tailings dam-break has many similarities with a common dam-break flow. It is highly transient and can be severely descructive. However, a significant difference is that the released sediment-water mixture will behave as a non-Newtonian flow. Existing numerical models used to simulate dam-break flows do not represent correctly the non-Newtonian behavior of tailings under a dam-break flow and may lead to unrealistic and incorrect results. The need for experiments to extract both qualitative and quantitative information regarding these flows is therefore real and actual. The present paper explores an existing experimental data base presented in Aleixo et al. (2014a,b) to further characterize the sediment transport under conditions of a severe transient flow and to extract quantitative information regarding sediment flow rate, sediment velocity, sediment-sediment interactions a among others. Different features of the flow are also described and analyzed in detail. The analysis is made by means of imaging techniques such as Particle Image Velocimetry and Particle Tracking Velocimetry that allow extracting not only the velocity field but the Lagrangian description of the sediments as well. An analysis of the results is presented and the limitations of the presented experimental approach are discussed. References Rico, M., Benito, G., Salgueiro, AR, Diez-Herrero, A. and Pereira, H.G. (2008) Reported tailings dam failures: A review of the European incidents in the worldwide context , Journal of Hazardous Materials, 152, 846-852 . Aleixo, R., Ozeren, Y., Altinakar, M. and Wren, D. (2014a) Velocity Measurements using Particle Tracking in Tailings dam Failure experiments, Proceedings of the 3rd IAHR-Europe conference, Porto, Portugal. Aleixo, R., Ozeren, Y., Altinakar, M. (2014b) Tailing dam-break analysis by means of a combined PIV-PTV tool, Proceedings of the River Flow Conference, Lausanne, Switzerland.

  4. Modelling the Effects of Land-Use Changes on Climate: a Case Study on Yamula DAM

    NASA Astrophysics Data System (ADS)

    Köylü, Ü.; Geymen, A.

    2016-10-01

    Dams block flow of rivers and cause artificial water reservoirs which affect the climate and the land use characteristics of the river basin. In this research, the effect of the huge water body obtained by Yamula Dam in Kızılırmak Basin is analysed over surrounding spatial's land use and climate change. Mann Kendal non-parametrical statistical test, Theil&Sen Slope method, Inverse Distance Weighting (IDW), Soil Conservation Service-Curve Number (SCS-CN) methods are integrated for spatial and temporal analysis of the research area. For this research humidity, temperature, wind speed, precipitation observations which are collected in 16 weather stations nearby Kızılırmak Basin are analyzed. After that these statistical information is combined by GIS data over years. An application is developed for GIS analysis in Python Programming Language and integrated with ArcGIS software. Statistical analysis calculated in the R Project for Statistical Computing and integrated with developed application. According to the statistical analysis of extracted time series of meteorological parameters, statistical significant spatiotemporal trends are observed for climate change and land use characteristics. In this study, we indicated the effect of big dams in local climate on semi-arid Yamula Dam.

  5. Evaluating temporal changes in hydraulic conductivities near karst-terrain dams: Dokan Dam (Kurdistan-Iraq)

    NASA Astrophysics Data System (ADS)

    Dafny, Elad; Tawfeeq, Kochar Jamal; Ghabraie, Kazem

    2015-10-01

    Dam sites provide an outstanding opportunity to explore dynamic changes in the groundwater flow regime because of the high hydraulic gradient rapidly induced in their surroundings. This paper investigates the temporal changes of the hydraulic conductivities of the rocks and engineered structures via a thorough analysis of hydrological data collected at the Dokam Dam, Iraq, and a numerical model that simulates the Darcian component of the seepage. Analysis of the data indicates increased seepage with time and suggests that the hydraulic conductivity of the rocks increased as the conductivity of the grout curtain decreased. Conductivity changes on the order of 10-8 m/s, in a 20-yr period were quantified using the numerical analysis. It is postulated that the changes in hydraulic properties in the vicinity of Dokan Dam are due to suspension of fine materials, interbedded in small fissures in the rocks, and re-settlement of these materials along the curtain. Consequently, the importance of the grout curtain to minimize the downstream seepage, not only as a result of the conductivity contrast with the rocks, but also as a barrier to suspended clay sediments, is demonstrated. The numerical analysis also helped us to estimate the proportion of the disconnected karstic conduit flow to the overall flow.

  6. Applying a two-dimensional morphodynamic model to assess impacts to Chinook salmon spawning habitat from dam removal

    NASA Astrophysics Data System (ADS)

    Lee, A. A.; Crosato, A.; Omer, A. Y. A.; Bregoli, F.

    2017-12-01

    The need for accurate and robust predictive methods of assessing fluvial ecosystems is highlighted by the accelerating practice of dam removal. Dam removal can be a restorative measure, but the sudden release of impounded sediment and change in flow regime may negatively impact aquatic biota and their habitat. This study assesses the performance of a quasi-three-dimensional morphodynamic numerical model, coupled with habitat suitability indices, to predict short-term impacts to Chinook salmon (Oncorhynchus tshawytscha) spawning habitat from dam removal. The 2007 removal of Marmot Dam on the Sandy River (Oregon, U.S.A.) is used as a case study. Delft3D-FLOW is employed to simulate changes in river channel topography, sediment composition and hydrodynamic conditions for a 20-kilometer reach of the Sandy River. The transport of non-uniform sediment and three-dimensional flow effects are included in the model. Output parameters such as flow depth, velocity and substrate are processed to evaluate habitat quality in the year following the Marmot Dam removal. Impacts are evaluated across four life-stages of Chinook salmon. As a hindcast analysis, the morphodynamic model sufficiently reproduces the evolution of river morphology at the reach-scale while requiring only a low level of calibration. The model performs well in predicting impacts to fish passage, but carries more uncertainty for developing life stages. By coupling flow-sediment-biota interactions, this method shows strong potential for habitat assessment in unsteady and non-uniform environments. Computation time is a primary constraint, as it limits grid-cell resolution, modelling of suspended sediment and capacity to characterize the sediment grain size distribution. Research on the effects of suspended sediment on habitat quality is ongoing, and further research is recommended for modelling reservoir erosion processes numerically.

  7. Coupled dam safety analysis using WinDAM

    USDA-ARS?s Scientific Manuscript database

    Windows® Dam Analysis Modules (WinDAM) is a set of modular software components that can be used to analyze overtopping and internal erosion of embankment dams. Dakota is an extensive software framework for design exploration and simulation. These tools can be coupled to create a powerful framework...

  8. Influences of Dam Operations in Groundwater-Surface Water Mixing Zones: Towards Multiscale Understanding

    NASA Astrophysics Data System (ADS)

    Stegen, J.; Scheibe, T. D.; Chen, X.; Huang, M.; Arntzen, E.; Garayburu-Caruso, V. A.; Graham, E.; Johnson, T. C.; Strickland, C. E.

    2017-12-01

    The installation and operation of dams have myriad influences on ecosystems, from direct effects on hydrographs to indirect effects on marine biogeochemistry and terrestrial food webs. With > 50000 existing and > 3700 planned large dams world-wide there is a pressing need for holistic understanding of dam impacts. Such understanding is likely to reveal unrecognized opportunities to modify dam operations towards beneficial outcomes. One of the most dramatic influences of daily dam operations is the creation of `artificial intertidal zones' that emerge from short-term increases and decreases in discharge due to hydroelectric power demands; known as hydropeaking. There is a long history of studying the influences of hydropeaking on macrofauna such as fish and invertebrates, but only recently has significant attention been paid to the hydrobiogeochemical effects of hydropeaking. Our aim here is to develop an integrated conceptual model of the hydrobiogeochemical influences of hydropeaking. To do so we reviewed available literature focusing on hydrologic and/or biogeochemical influences of hydropeaking. Results from these studies were collated into a single conceptual model that integrates key physical (e.g., sediment transport, hydromorphology) and biological (e.g., timescale of microbiome response) processes. This conceptual model highlights non-intuitive impacts of hydropeaking, the presence of critical thresholds, and strong interactions among processes. When examined individually these features suggest context dependency, but when viewed through an integrated conceptual model, common themes emerge. We will further discuss a critical next step, which is the local to regional to global evaluation of this conceptual model, to enable multiscale understanding. We specifically propose a global `hydropeaking network' of researchers using common methods, data standards, and analysis techniques to quantify the hydrobiogeochemical effects of hydropeaking across biomes. We will conclude with a prospective discussion of key science questions that emerge from the conceptual model and that can only be answered through a global, synchronized effort. Such an effort has the potential to strongly influence dam operations towards improved health of river corridor ecosystems from local to global scales.

  9. Investigation on trophic state index by artificial neural networks (case study: Dez Dam of Iran)

    NASA Astrophysics Data System (ADS)

    Saghi, H.; Karimi, L.; Javid, A. H.

    2015-06-01

    Dam construction and surface runoff control is one of the most common approaches for water-needs supply of human societies. However, the increasing development of social activities and hence the subsequent increase in environmental pollutants leads to deterioration of water quality in dam reservoirs and eutrophication process could be intensified. So, the water quality of reservoirs is now one of the key factors in operation and water quality management of reservoirs. Hence, maintaining the quality of the stored water and identification and examination of changes along time has been a constant concern of humans that involves the water authorities. Traditionally, empirical trophic state indices of dam reservoirs often defined based on changes in concentration of effective factors (nutrients) and its consequences (increase in chlorophyll a), have been used as an efficient tool in the definition of dam reservoirs quality. In recent years, modeling techniques such as artificial neural networks have enhanced the prediction capability and the accuracy of these studies. In this study, artificial neural networks have been applied to analyze eutrophication process in the Dez Dam reservoir in Iran. In this paper, feed forward neural network with one input layer, one hidden layer and one output layer was applied using MATLAB neural network toolbox for trophic state index (TSI) analysis in the Dez Dam reservoir. The input data of this network are effective parameters in the eutrophication: nitrogen cycle parameters and phosphorous cycle parameters and parameters that will be changed by eutrophication: Chl a, SD, DO and the output data is TSI. Based on the results from estimation of modified Carlson trophic state index, Dez Dam reservoir is considered to be eutrophic in the early July to mid-November and would be mesotrophic with decrease in temperature. Therefore, a decrease in water quality of the dam reservoir during the warm seasons is expectable. The results indicated that artificial neural network (ANN) is a suitable tool for quality modeling of reservoir of dam and increment and decrement of nutrients in trend of eutrophication. Therefore, ANN is a suitable tool for quality modeling of reservoir of dam.

  10. Design of Installing Check Dam Using RAMMS Model in Seorak National Park of South Korea

    NASA Astrophysics Data System (ADS)

    Jun, K.; Tak, W.; JUN, B. H.; Lee, H. J.; KIM, S. D.

    2016-12-01

    Design of Installing Check Dam Using RAMMS Model in Seorak National Park of South Korea Kye-Won Jun*, Won-Jun Tak*, Byong-Hee Jun**, Ho-Jin Lee***, Soung-Doug Kim* *Graduate School of Disaster Prevention, Kangwon National University, 346 Joogang-ro, Samcheok-si, Gangwon-do, Korea **School of Fire and Disaster Protection, Kangwon National University, 346 Joogang-ro, Samcheok-si, Gangwon-do, Korea ***School of Civil Engineering, Chungbuk National University, 1 Chungdae-ro, Seowon-gu, Cheongju, Korea Abstract As more than 64% of the land in South Korea is mountainous area, so many regions in South Korea are exposed to the danger of landslide and debris flow. So it is important to understand the behavior of debris flow in mountainous terrains, the various methods and models are being presented and developed based on the mathematical concept. The purpose of this study is to investigate the regions that experienced the debris flow due to typhoon called Ewiniar and to perform numerical modeling to design and layout of the Check dam for reducing the damage by the debris flow. For the performance of numerical modeling, on-site measurement of the research area was conducted including: topographic investigation, research on bridges in the downstream, and precision LiDAR 3D scanning for composed basic data of numerical modeling. The numerical simulation of this study was performed using RAMMS (Rapid Mass Movements Simulation) model for the analysis of the debris flow. This model applied to the conditions of the Check dam which was installed in the upstream, midstream, and downstream. Considering the reduction effect of debris flow, the expansion of debris flow, and the influence on the bridges in the downstream, proper location of the Check dam was designated. The result of present numerical model showed that when the Check dam was installed in the downstream section, 50 m above the bridge, the reduction effect of the debris flow was higher compared to when the Check dam were installed in other sections. Key words: Debris flow, LiDAR, Check dam, RAMMSAcknowledgementsThis research was supported by a grant [MPSS-NH-2014-74] through the Disaster and Safety Management Institute funded by Ministry of Public Safety and Security of Korean government

  11. National Dam Safety Program. Delmar Reservoir Number 1 Dam (Inventory Number N.Y. 1401), Lower Hudson River Basin, Albany County, New York. Phase I Inspection Report,

    DTIC Science & Technology

    1981-09-14

    provides Infortiation ar’d analysis ort tlepk-sical conditi dain as of the report date. Informatior% andI analysis are baseti oA yis inspection of the... analysis was not performed in the usual manner of modeling a watershed area. The drainage area for this structure was limited to the reservoir itself...SYSTEM 6 4.4 EVALUATION 6 5 HYDROLOGIC/HYDRAULIC 7 * *1 I PAGE NO. 5.1 DRAINAGE AREA CHARACTERISTICS 7 5.2 ANALYSIS CRITERIA 7 5.3 SPILLWAY CRITERIA 7 5.4

  12. Dynamic analysis of an inflatable dam subjected to a flood

    NASA Astrophysics Data System (ADS)

    Lowery, K.; Liapis, S.

    A dynamic simulation of the response of an inflatable dam subjected to a flood is carried out to determine the survivability envelope of the dam where it can operate without rupture, or overflow. The free-surface flow problem is solved in two dimensions using a fully nonlinear mixed Eulerian-Lagrangian formulation. The dam is modeled as an elastic shell inflated with air and simply supported from two points. The finite element method is employed to determine the dynamic response of the structure using ABAQUS with a shell element. The problem is solved in the time domain which allows the prediction of a number of transient phenomena such as the generation of upstream advancing waves, the dynamic structural response and structural failure. Failure takes place when the dam either ruptures or overflows. Stresses in the dam material were monitored to determine when rupture occurs. An iterative study was performed to find the serviceability envelope of the dam in terms of the internal pressure and the flood Froude number for two flood depths. It was found that existing inflatable dams are quite effective in suppressing floods for a relatively wide range of flood velocities.

  13. Prioritizing removal of dams for passage of diadromous fishes on a major river system

    USGS Publications Warehouse

    Kocovsky, P.M.; Ross, R.M.; Dropkin, D.S.

    2009-01-01

    Native diadromous fishes have been extirpated from much of the Susquehanna River system for nearly a century. Recent restoration efforts have focused on removal of dams, but there are hundreds of dams and presently there is no biologically based system to assist in prioritizing their removal. We present a new method that uses existing habitat suitability index models (HSI) for American shad Alosa sapidissima, alewife A. pseudoharengus, blueback herring A. aestivalis, and American eel Anguilla rostrata to prioritize the removal of non-hydropower dams within the Susquehanna River system. We ranked HSI scores for each of the four species, association between a landscape-scale factor and HSIs, length of river opened by removing a dam, and distance from the mouth at Chesapeake Bay for each dam and then calculated a mean rank prioritization for dam removal by averaging the ranks for the seven criteria. This prioritization method is resistant to outliers, is not strongly affected by somewhat arbitrary decisions on metrics included in the analysis, and provides a biologically based prioritization for dam removal that can be easily amended to include other metrics or adapted to other river systems and that complements other social and economic considerations that must be included in decisions to remove dams.

  14. Rock Mass Behavior Under Hydropower Embankment Dams: A Two-Dimensional Numerical Study

    NASA Astrophysics Data System (ADS)

    Bondarchuk, A.; Ask, M. V. S.; Dahlström, L.-O.; Nordlund, E.

    2012-09-01

    Sweden has more than 190 large hydropower dams, of which about 50 are pure embankment dams and over 100 are concrete/embankment dams. This paper presents results from conceptual analyses of the response of typical Swedish rock mass to the construction of a hydropower embankment dam and its first stages of operation. The aim is to identify locations and magnitudes of displacements that are occurring in the rock foundation and grout curtain after construction of the dam, the first filling of its water reservoir, and after one seasonal variation of the water table. Coupled hydro-mechanical analysis was conducted using the two-dimensional distinct element program UDEC. Series of the simulations have been performed and the results show that the first filling of the reservoir and variation of water table induce largest magnitudes of displacement, with the greatest values obtained from the two models with high differential horizontal stresses and smallest spacing of sub-vertical fractures. These results may help identifying the condition of the dam foundation and contribute to the development of proper maintenance measures, which guarantee the safety and functionality of the dam. Additionally, newly developed dams may use these results for the estimation of the possible response of the rock foundation to the construction.

  15. Nonlinear scaling of the Unit Hydrograph Peaking Factor for dam safety

    NASA Astrophysics Data System (ADS)

    Pradhan, N. R.; Loney, D.

    2017-12-01

    Existing U.S. Army Corps of Engineers (USACE) policy suggests unit hydrograph peaking factor (UHPF), the ratio of an observed and modeled event unit hydrograph peak, range between 1.25 and 1.50 to ensure dam safety. It is pertinent to investigate the impact of extreme flood events on the validity of this range through physically based rainfall-runoff models not available during the planning and design of most USACE dams. The UHPF range was analyzed by deploying the Gridded Surface Subsurface Hydrologic Analysis (GSSHA) model in the Goose Creek, VA, watershed to develop a UHPF relationship with excess rainfall across various return-period events. An effective rainfall factor (ERF) is introduced to validate existing UHPF guidance as well as provide a nonlinear UHPF scaling relation when effective rainfall does not match that of the UH design event.

  16. Flood hydrology and dam-breach hydraulic analyses of four reservoirs in the Black Hills, South Dakota

    USGS Publications Warehouse

    Hoogestraat, Galen K.

    2011-01-01

    Extensive information about the construction of dams or potential downstream hazards in the event of a dam breach is not available for many small reservoirs within the Black Hills National Forest. In 2009, the U.S. Forest Service identified the need for reconnaissance-level dam-breach assessments for four of these reservoirs within the Black Hills National Forest (Iron Creek, Horsethief, Lakota, and Mitchell Lakes) with the potential to flood downstream structures. Flood hydrology and dam-breach hydraulic analyses for the four selected reservoirs were conducted by the U.S. Geological Survey in cooperation with the U.S. Forest service to estimate the areal extent of downstream inundation. Three high-flow breach scenarios were considered for cases when the dam is in place (overtopped) and when a dam break (failure) occurs: the 100-year recurrence 24-hour precipitation, 500-year recurrence peak flow, and the probable maximum precipitation. Inundation maps were developed that show the estimated extent of downstream floodwaters from simulated scenarios. Simulation results were used to determine the hazard classification of a dam break (high, significant, or low), based primarily on the potential for loss of life or property damage resulting from downstream inundation because of the flood surge.The inflow design floods resulting from the two simulated storm events (100-year 24-hour and probable maximum precipitation) were determined using the U.S. Army Corps of Engineers Hydrologic Engineering Center Hydrologic Modeling System (HEC-HMS). The inflow design flood for the 500-year recurrence peak flow was determined by using regional regression equations developed for streamflow-gaging stations with similar watershed characteristics. The step-backwater hydraulic analysis model, Hydrologic Engineering Center's River Analysis System (HEC-RAS), was used to determine water-surface profiles of in-place and dam-break scenarios for the three inflow design floods that were simulated. Inundation maps for in-place and dam-break scenarios were developed for the area downstream from the dam to the mouth of each stream.Dam-break scenarios for three of the four reservoirs assessed in this study were rated as low hazards owing to absence of permanent structures downstream from the dams. Iron Creek Lake's downstream channel to its mouth does not include any permanent structures within the inundation flood plains. For the two reservoirs with the largest watershed areas, Lakota and Mitchell Lake, the additional floodwater surge resulting from a dam break would be minor relative to the magnitude of the large flood streamflow into the reservoirs, based on the similar areal extent of inundation for the in-place and dam-break scenarios as indicated by the developed maps. A dam-break scenario at Horsethief Lake is rated as a significant hazard because of potential lives-in-jeopardy in downstream dwellings and appreciable economic loss.

  17. Habitat mosaics and path analysis can improve biological conservation of aquatic biodiversity in ecosystems with low-head dams

    USGS Publications Warehouse

    Hitchman, Sean M.; Mather, Martha E.; Smith, Joseph M.; Fencl, Jane S.

    2018-01-01

    Conserving native biodiversity depends on restoring functional habitats in the face of human-induced disturbances. Low-head dams are a ubiquitous human impact that degrades aquatic ecosystems worldwide. To improve our understanding of how low-head dams impact habitat and associated biodiversity, our research examined complex interactions among three spheres of the total environment. i.e., how low-head dams (anthroposphere) affect aquatic habitat (hydrosphere), and native biodiversity (biosphere) in streams and rivers. Creation of lake-like habitats upstream of low-head dams is a well-documented major impact of dams. Alterations downstream of low head dams also have important consequences, but these downstream dam effects are more challenging to detect. In a multidisciplinary field study at five dammed and five undammed sites within the Neosho River basin, KS, we tested hypotheses about two types of habitat sampling (transect and mosaic) and two types of statistical analyses (analysis of covariance and path analysis). We used fish as our example of biodiversity alteration. Our research provided three insights that can aid environmental professionals who seek to conserve and restore fish biodiversity in aquatic ecosystems threatened by human modifications. First, a mosaic approach identified habitat alterations below low-head dams (e.g. increased proportion of riffles) that were not detected using the more commonly-used transect sampling approach. Second, the habitat mosaic approach illustrated how low-head dams reduced natural variation in stream habitat. Third, path analysis, a statistical approach that tests indirect effects, showed how dams, habitat, and fish biodiversity interact. Specifically, path analysis revealed that low-head dams increased the proportion of riffle habitat below dams, and, as a result, indirectly increased fish species richness. Furthermore, the pool habitat that was created above low-head dams dramatically decreased fish species richness. As we show here, mosaic habitat sampling and path analysis can help conservation practitioners improve science-based management plans for disturbed aquatic systems worldwide.

  18. Habitat mosaics and path analysis can improve biological conservation of aquatic biodiversity in ecosystems with low-head dams.

    PubMed

    Hitchman, Sean M; Mather, Martha E; Smith, Joseph M; Fencl, Jane S

    2018-04-01

    Conserving native biodiversity depends on restoring functional habitats in the face of human-induced disturbances. Low-head dams are a ubiquitous human impact that degrades aquatic ecosystems worldwide. To improve our understanding of how low-head dams impact habitat and associated biodiversity, our research examined complex interactions among three spheres of the total environment. i.e., how low-head dams (anthroposphere) affect aquatic habitat (hydrosphere), and native biodiversity (biosphere) in streams and rivers. Creation of lake-like habitats upstream of low-head dams is a well-documented major impact of dams. Alterations downstream of low head dams also have important consequences, but these downstream dam effects are more challenging to detect. In a multidisciplinary field study at five dammed and five undammed sites within the Neosho River basin, KS, we tested hypotheses about two types of habitat sampling (transect and mosaic) and two types of statistical analyses (analysis of covariance and path analysis). We used fish as our example of biodiversity alteration. Our research provided three insights that can aid environmental professionals who seek to conserve and restore fish biodiversity in aquatic ecosystems threatened by human modifications. First, a mosaic approach identified habitat alterations below low-head dams (e.g. increased proportion of riffles) that were not detected using the more commonly-used transect sampling approach. Second, the habitat mosaic approach illustrated how low-head dams reduced natural variation in stream habitat. Third, path analysis, a statistical approach that tests indirect effects, showed how dams, habitat, and fish biodiversity interact. Specifically, path analysis revealed that low-head dams increased the proportion of riffle habitat below dams, and, as a result, indirectly increased fish species richness. Furthermore, the pool habitat that was created above low-head dams dramatically decreased fish species richness. As we show here, mosaic habitat sampling and path analysis can help conservation practitioners improve science-based management plans for disturbed aquatic systems worldwide. Copyright © 2017 Elsevier B.V. All rights reserved.

  19. Progressive failure of lower San Fernando dam

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gu, W.H.; Morgenstern, N.R.; Robertson, P.K.

    1993-02-01

    Postearthquake deformation analyses of the lower San Fernando dam were conducted using an incremental finite-element method. In the analyses, an undrained elastoplastic model was used to simulate the collapse of liquefied materials. The model is developed based on the critical-state boundary-surface theory, the concept of steady-state strength, and the undrained behavior of liquefiable soils. A triggering condition in terms of a collapse surface was considered in this model. The hyperbolic strain-softening relationship has been introduced to simulate the postpeak behavior of liquefied materials. The analyses have shown that a progressive failure under undrained conditions may explain the observed response ofmore » the lower San Fernando dam following the 1971 earthquake. Stress redistribution initiated by the strain softening of liquefied materials is the main reason for undrained flow failures of dams, slopes, and foundations and can occur in a short period ranging from a few seconds to a few minutes. The liquefied zone after stress redistribution may be much larger than the initial liquefied zone caused directly by an earthquake. Therefore, a postearthquake deformation analysis may be essential in liquefaction stability evaluations.« less

  20. Morphodynamics of Travertine Dam/Waterfall Growth due to the Interaction of Biological Activity, Water Flow and Limestone Emplacement

    NASA Astrophysics Data System (ADS)

    Izumi, N.; Parker, G.

    2012-12-01

    Plitvice Lakes in Croatia are characterized by a step-like train of lakes and waterfalls. The waterfalls are located at the crests of naturally-emplaced dams. The top of each dam grows upward at the rate of a few millimeters per year. It is thought that the upward growth of these dams is caused by the interaction of water flow and biological activity, resulting in the precipitation of dissolved limestone. Dam evolution is initiated by the growth of mosses that favor swift, shallow water. Bacteria that inhabit the roots of the moss excrete solid limestone (travertine) from the water. The limestone fossilizes the moss, and then more moss grows on top of the travertine deposit. In this way, the natural dam can grow over to 10 m high, impounding the water behind it to form a lake. We propose a simple model to explain the formation of natural limestone dams by the interaction between water flow and biologically-mediated travertine deposition. We assume for simplicity that light is the only factor determining the growth of moss, which is then colonized by travertine-emplacing bacteria. We also assume that the water is saturated with dissolved limestone, so that the process is not limited by limestone availability. Photosynthesis, and thus the growth rate of moss are crudely approximated as decreasing linearly with depth. We employ the shallow water equations to describe water flow over the dam. In order to obtain a profile of permanent form for a dam migrating upward and downstream at constant speed, we solve the problem in a moving coordinate system. When water flows over the dam, it is accelerated in the streamwise direction, and the water surface forms a backwater curve. The flow regime changes from Froude-subcritical to Froude-supercritical at a point slightly downstream of the crest of the dam. Farther downstream, the flow attains a threshold velocity beyond which moss is detached. This threshold point defines the downstream end of the active part of the dam. The analysis provides a first-order morphodynamic model of natural dam/waterfall evolution.

  1. Performance of Koyna dam based on static and dynamic analysis

    NASA Astrophysics Data System (ADS)

    Azizan, Nik Zainab Nik; Majid, Taksiah A.; Nazri, Fadzli Mohamed; Maity, Damodar

    2017-10-01

    This paper discusses the performance of Koyna dam based on static pushover analysis (SPO) and incremental dynamic analysis (IDA). The SPO in this study considered two type of lateral load which is inertial load and hydrodynamic load. The structure was analyse until the damage appears on the structure body. The IDA curves were develop based on 7 ground motion, where the characteristic of the ground motions: i) the distance from the epicenter is less than 15km, (ii) the magnitude is equal to or greater than 5.5 and (iii) the PGA is equal to or greater than 0.15g. All the ground motions convert to respond spectrum and scaled according to the developed elastic respond spectrum in order to match the characteristic of the ground motion to the soil type. Elastic respond spectrum developed based on soil type B by using Eurocode 8. By using SPO and IDA method are able to determine the limit states of the dam. The limit state proposed in this study are yielding and ultimate state which is identified base on crack pattern perform on the structure model. The comparison of maximum crest displacement for both methods is analysed to define the limit state of the dam. The displacement of yielding state for Koyna dam is 23.84mm and 44.91mm for the ultimate state. The results are able to be used as a guideline to monitor Koyna dam under seismic loadings which are considering static and dynamic.

  2. Epidemiology of clinical feline herpesvirus infection in zoo-housed cheetahs (Acinonyx jubatus).

    PubMed

    Witte, Carmel L; Lamberski, Nadine; Rideout, Bruce A; Vaida, Florin; Citino, Scott B; Barrie, Michael T; Haefele, Holly J; Junge, Randall E; Murray, Suzan; Hungerford, Laura L

    2017-10-15

    OBJECTIVE To determine the incidence of and risk factors for clinical feline herpesvirus (FHV) infection in zoo-housed cheetahs and determine whether dam infection was associated with offspring infection. DESIGN Retrospective cohort study. ANIMALS 144 cheetah cubs born in 6 zoos from 1988 through 2007. PROCEDURES Data were extracted from the health records of cheetahs and their dams to identify incident cases of clinical FHV infection and estimate incidence from birth to 18 months of age. Univariate and multivariable Cox proportional hazards models, controlling for correlations among cheetahs with the same dam, were used to identify risk factors for incident FHV infection. RESULTS Cumulative incidence of FHV infection in cheetah cubs was 35% (50/144). No significant association between dam and offspring infection was identified in any model. Factors identified as significant through multivariable analysis varied by age group. For cheetahs up to 3 months of age, the most important predictor of FHV infection was having a dam that had received a preparturition FHV vaccine regimen that included a modified-live virus vaccine versus a dam that had received no preparturition vaccine. Other risk factors included being from a small litter, being born to a primiparous dam, and male sex. CONCLUSIONS AND CLINICAL RELEVANCE This study provided the first population-level characterization of the incidence of and risk factors for FHV infection in cheetahs, and findings confirmed the importance of this disease. Recognition that clinical FHV infection in the dam was not a significant predictor of disease in cubs and identification of other significant factors have implications for disease management.

  3. Thermal effects of dams in the Willamette River basin, Oregon

    USGS Publications Warehouse

    Rounds, Stewart A.

    2010-01-01

    Methods were developed to assess the effects of dams on streamflow and water temperature in the Willamette River and its major tributaries. These methods were used to estimate the flows and temperatures that would occur at 14 dam sites in the absence of upstream dams, and river models were applied to simulate downstream flows and temperatures under a no-dams scenario. The dams selected for this study include 13 dams built and operated by the U.S. Army Corps of Engineers (USACE) as part of the Willamette Project, and 1 dam on the Clackamas River owned and operated by Portland General Electric (PGE). Streamflows in the absence of upstream dams for 2001-02 were estimated for USACE sites on the basis of measured releases, changes in reservoir storage, a correction for evaporative losses, and an accounting of flow effects from upstream dams. For the PGE dam, no-project streamflows were derived from a previous modeling effort that was part of a dam-relicensing process. Without-dam streamflows were characterized by higher peak flows in winter and spring and much lower flows in late summer, as compared to with-dam measured flows. Without-dam water temperatures were estimated from measured temperatures upstream of the reservoirs (the USACE sites) or derived from no-project model results (the PGE site). When using upstream data to estimate without-dam temperatures at dam sites, a typical downstream warming rate based on historical data and downstream river models was applied over the distance from the measurement point to the dam site, but only for conditions when the temperature data indicated that warming might be expected. Regressions with measured temperatures from nearby or similar sites were used to extend the without-dam temperature estimates to the entire 2001-02 time period. Without-dam temperature estimates were characterized by a more natural seasonal pattern, with a maximum in July or August, in contrast to the measured patterns at many of the tall dam sites where the annual maximum temperature typically occurred in September or October. Without-dam temperatures also tended to have more daily variation than with-dam temperatures. Examination of the without-dam temperature estimates indicated that dam sites could be grouped according to the amount of streamflow derived from high-elevation, spring-fed, and snowmelt-driven areas high in the Cascade Mountains (Cougar, Big Cliff/Detroit, River Mill, and Hills Creek Dams: Group A), as opposed to flow primarily derived from lower-elevation rainfall-driven drainages (Group B). Annual maximum temperatures for Group A ranged from 15 to 20 degree(s)C, expressed as the 7-day average of the daily maximum (7dADM), whereas annual maximum 7dADM temperatures for Group B ranged from 21 to 25 degrees C. Because summertime stream temperature is at least somewhat dependent on the upstream water source, it was important when estimating without-dam temperatures to use correlations to sites with similar upstream characteristics. For that reason, it also is important to maintain long-term, year-round temperature measurement stations at representative sites in each of the Willamette River basin's physiographic regions. Streamflow and temperature estimates downstream of the major dam sites and throughout the Willamette River were generated using existing CE-QUAL-W2 flow and temperature models. These models, originally developed for the Willamette River water-temperature Total Maximum Daily Load process, required only a few modifications to allow them to run under the greatly reduced without-dam flow conditions. Model scenarios both with and without upstream dams were run. Results showed that Willamette River streamflow without upstream dams was reduced to levels much closer to historical pre-dam conditions, with annual minimum streamflows approximately one-half or less of dam-augmented levels. Thermal effects of the dams varied according to the time of year, from cooling in mid-summer to warm

  4. Toward improved design of check dam systems: A case study in the Loess Plateau, China

    NASA Astrophysics Data System (ADS)

    Pal, Debasish; Galelli, Stefano; Tang, Honglei; Ran, Qihua

    2018-04-01

    Check dams are one of the most common strategies for controlling sediment transport in erosion prone areas, along with soil and water conservation measures. However, existing mathematical models that simulate sediment production and delivery are often unable to simulate how the storage capacity of check dams varies with time. To explicitly account for this process-and to support the design of check dam systems-we developed a modelling framework consisting of two components, namely (1) the spatially distributed Soil Erosion and Sediment Delivery Model (WaTEM/SEDEM), and (2) a network-based model of check dam storage dynamics. The two models are run sequentially, with the second model receiving the initial sediment input to check dams from WaTEM/SEDEM. The framework is first applied to Shejiagou catchment, a 4.26 km2 area located in the Loess Plateau, China, where we study the effect of the existing check dam system on sediment dynamics. Results show that the deployment of check dams altered significantly the sediment delivery ratio of the catchment. Furthermore, the network-based model reveals a large variability in the life expectancy of check dams and abrupt changes in their filling rates. The application of the framework to six alternative check dam deployment scenarios is then used to illustrate its usefulness for planning purposes, and to derive some insights on the effect of key decision variables, such as the number, size, and site location of check dams. Simulation results suggest that better performance-in terms of life expectancy and sediment delivery ratio-could have been achieved with an alternative deployment strategy.

  5. Innovative techniques for analyzing the three-dimensional behavioral results from acoustically tagged fish

    NASA Astrophysics Data System (ADS)

    Steig, Tracey W.; Timko, Mark A.

    2005-04-01

    Acoustic tags were used to monitor the swimming patterns of downstream migrating salmon smolts approaching various dams on the Columbia River, USA. Downstream migrating yearling chinook (Oncorhynchus tshawytscha), steelhead (Oncorhynchus mykiss), sockeye (Oncorhynchus nerka), and sub-yearling chinook smolts were surgically implanted with acoustic tags. Fish were tracked in three-dimensions as they approached and passed into the turbine intakes, spillways, and surface bypass channel entrances at the dams during the 2004 spring and summer outmigrations. A number of advances in the analysis techniques and software have been made over the past few years. Some of these improvements include the development of various fish density algorithms, stream trace modeling analysis, and advances of three-dimensional animation programs. Three-dimensional tracks of fish approaching the turbine intakes, spillways, and surface bypass channel entrances will be presented. Concentrations of fish passage will be presented as three-dimensional fish densities superimposed over dam structures. Stream trace modeling animation will be presented showing predicted fish passage routes.

  6. Dam pre-release as an important operation strategy in reducing flood impact in Malaysia

    NASA Astrophysics Data System (ADS)

    Hidayah Ishak, Nurul; Mustafa Hashim, Ahmad

    2018-03-01

    The 2014 flood was reported to be one of the worst natural disaster has ever affected several states in the northern part of Peninsular Malaysia. Overwhelming rainfall was noted as one of the main factors causing such impact, which was claimed to be unprecedented to some extent. The state of Perak, which is blessed with four cascading dams had also experienced flood damage at a scale that was considered the worst in history. The rainfall received had caused the dam to reach danger level that necessitated additional discharge to be released. Safety of the dams was of great importance and such unavoidable additional discharge was allowed to avoid catastrophic failure of the dam structures. This paper discusses the dam pre-release as a significant dam management strategy in reducing flood impact. An important balance between required dam storage to be maintained and the risk element that can be afforded is the crucial factor in such enhanced operation strategy. While further possibility in developing a carefully engineered dam pre-release strategy can be explored for dam operation in Malaysia, this has already been introduced in some developed countries. Australia and South Africa are examples where pre-release has been practiced and proven to reduce flood risk. The concept involves controlling the dam lake level throughout the year, in reference to the rainfall data and the hydrological properties for the catchment area of the dams. Plentiful data analysis need to be done in contemplation of producing the optimal pre-release model. The amount of heavy rainfalls received is beyond human control but the distribution of the discharge from the dams can be further managed with the appropriate pre-release strategy.

  7. Responses of riparian reptile communities to damming and urbanization

    USGS Publications Warehouse

    Hunt, Stephanie D.; Guzy, Jacquelyn C.; Price, Steven J.; Halstead, Brian J.; Eskew, Evan A.; Dorcas, Michael E.

    2013-01-01

    Various anthropogenic pressures, including habitat loss, threaten reptile populations worldwide. Riparian zones are critical habitat for many reptile species, but these habitats are also frequently modified by anthropogenic activities. Our study investigated the effects of two riparian habitat modifications-damming and urbanization-on overall and species-specific reptile occupancy patterns. We used time-constrained search techniques to compile encounter histories for 28 reptile species at 21 different sites along the Broad and Pacolet Rivers of South Carolina. Using a hierarchical Bayesian analysis, we modeled reptile occupancy responses to a site's distance upstream from dam, distance downstream from dam, and percent urban land use. The mean occupancy response by the reptile community indicated that reptile occupancy and species richness were maximized when sites were farther upstream from dams. Species-specific occupancy estimates showed a similar trend of lower occupancy immediately upstream from dams. Although the mean occupancy response of the reptile community was positively related to distance downstream from dams, the occupancy response to distance downstream varied among species. Percent urban land use had little effect on the occupancy response of the reptile community or individual species. Our results indicate that the conditions of impoundments and subsequent degradation of the riparian zones upstream from dams may not provide suitable habitat for a number of reptile species.

  8. Study on seepage characteristics of inclined wall dam after heavy drought

    NASA Astrophysics Data System (ADS)

    Wei, YE; Fuheng, MA

    2018-05-01

    For seepage of the dam slope with cracks after drought, there are two methods to study including the physical model test and numerical calculation. However, the physical model test can not visualize the seepage field in the dam body intuitively, and the mathematical model is not accurate because of the precision of the parameter. So in this paper, combined physical model with mathematical model, the surface crack development on the dam slope and the changes of pore water pressure were studied through the physical model test, and then numerical calculation was carried out to analyze the internal seepage of the dam body. The results showed that cracks were more likely to develop at middle of the upstream dam slope and dam heel, and cracks for different degrees appeared at different parts of the dam slope after drought. The development of cracks provided a preferential permeable channel which caused that the area near the crack was easily to become saturated. The saturated zone kept expanding leading the infiltration line to be close to the transition layer and the infiltration line was no longer a smooth curve. There were seepage damages and landslide hazards existing with such seepage characteristics, which would threaten the safety of the dam.

  9. Modelling the impact of dam removal on geomorphic channel response and sediment delivery: an Austrian case study

    NASA Astrophysics Data System (ADS)

    Pöppl, Ronald; Coulthard, Tom; Keesstra, Saskia; Keiler, Margreth

    2015-04-01

    Dams are often considered to have the most significant impact on rivers as dam construction generally reduces downstream sediment fluxes which further involves geomorphic changes in the affected river reaches. Since many dams no longer fulfill their intended purpose (e.g. due to siltation), are dangerous (e.g. catastrophic dam failures) and/or are ecologically damaging (e.g. habitat destruction), within the last two decades several dams have been removed and many more are already proposed for removal. Unfortunately, there is still only little empirical knowledge about the geomorphic consequences of dam removals and the related sediment release which represents a big challenge for river management. Modelling is one way to approach this problem. In the presented study we modelled the impacts of dam removal on geomorphic channel processes, channel morphology and sediment delivery further considering the role of channel engineering measures and reservoir excavation within a river reach impacted by a series of dams using the landscape evolution model CAESAR-Lisflood. The model was run with data from a small catchment located in Lower Austria. Modelled geomorphic channel changes and sediment fluxes were spatio-temporally analyzed, related to real-world data and are discussed in the context of river management issues.

  10. Outlet Works for Cerrillos Dam, Cerrillos River, and Portugues Dam, Portugues River, Puerto Rico; Hydraulic Model Investigation.

    DTIC Science & Technology

    1979-03-01

    Tests were conducted on a 1:24-scale model of the outlet works for the Cerrillos and Portugues Dams located in Puerto Rico. The purpose of the model... Portugues outlet works were designed to provide for river diversion during construction of the dams. When the dams are completed, the flow will be regulated... Portugues . However, the stilling basins were designed for 2500 cfs (Cerrillos) and 1100 cfs ( Portugues ), the bank-full capacities downstream. Therefore

  11. Groundwater-Surface Water Interaction: A Case Study of Embankment Dam Safety Assessment in Sweden.

    NASA Astrophysics Data System (ADS)

    Ferdos, F.; Dargahi, B.

    2015-12-01

    Seepage, when excessive and unimpeded, can cause embankment dam failure. Such failures are often initiated by internal erosion and piping. Modelling these phenomena in embankment dams, accounting for the groundwater-surface water interactions, is crucial when performing dam safety assessments. The aim of this study was to evaluate the applicability of modelling seepage flows in multi-region dams using a finite element based multi-physics model. The model was applied to the Trängslet dam, the largest dam in Sweden. The objectives were to analyze the characteristics of both the flow and the surface-ground water interactions occurring in the dam, including: i) the saturated and unsaturated laminar flow regimes within the dam body, ii) the non-linear through-flow in the dam shoulders' coarse material, iii) the influence of the surface waves in the reservoir on the seepage flow by coupling the physics to a hydrodynamic interface, and iv) the influence of a conceptual "erosion tunnel" on the seepage flow and its interaction with the surface water flow by coupling the physics to a CFD interface. The focus of the study was on the influence of the transient water head boundary condition, surface waves and the internal erosion tunnel on the location of the phreatic line and the seepage flow rate. The simulated seepage flow of the dam in its original condition tallied with the monitoring measurements (40-70 l/s). The main feature found was the relatively high position of the phreatic line, which could compromise the stability of the dam. The combination of the seepage model with the reservoir hydrodynamics indicated a negligible influence of the surface waves on seepage flow. Results from the combination of the seepage model with fluid dynamics indicated that a conceptual "erosion tunnel" placed within the dam, even as high as in the unsaturated zone, significantly affects the phreatic line's position. This also causes the seepage flow to increase by several orders of magnitude, resulting in non-linear turbulent flow regimes in the downstream shoulder of the dam and, ultimately, dam failure. While the modelling was limited by a lack of reliable geometrical and geotechnical data, the results of the study do highlight the importance of including groundwater-surface water interactions in dam safety assessments.

  12. A step-wise approach for analysis of the mouse embryonic heart using 17.6 Tesla MRI

    PubMed Central

    Gabbay-Benziv, Rinat; Reece, E. Albert; Wang, Fang; Bar-Shir, Amnon; Harman, Chris; Turan, Ozhan M.; Yang, Peixin; Turan, Sifa

    2018-01-01

    Background The mouse embryo is ideal for studying human cardiac development. However, laboratory discoveries do not easily translate into clinical findings partially because of histological diagnostic techniques that induce artifacts and lack standardization. Aim To present a step-wise approach using 17.6 T MRI, for evaluation of mice embryonic heart and accurate identification of congenital heart defects. Subjects 17.5-embryonic days embryos from low-risk (non-diabetic) and high-risk (diabetic) model dams. Study design Embryos were imaged using 17.6 Tesla MRI. Three-dimensional volumes were analyzed using ImageJ software. Outcome measures Embryonic hearts were evaluated utilizing anatomic landmarks to locate the four-chamber view, the left- and right-outflow tracts, and the arrangement of the great arteries. Inter- and intra-observer agreement were calculated using kappa scores by comparing two researchers’ evaluations independently analyzing all hearts, blinded to the model, on three different, timed occasions. Each evaluated 16 imaging volumes of 16 embryos: 4 embryos from normal dams, and 12 embryos from diabetic dams. Results Inter-observer agreement and reproducibility were 0.779 (95% CI 0.653–0.905) and 0.763 (95% CI 0.605–0.921), respectively. Embryonic hearts were structurally normal in 4/4 and 7/12 embryos from normal and diabetic dams, respectively. Five embryos from diabetic dams had defects: ventricular septal defects (n = 2), transposition of great arteries (n = 2) and Tetralogy of Fallot (n = 1). Both researchers identified all cardiac lesions. Conclusion A step-wise approach for analysis of MRI-derived 3D imaging provides reproducible detailed cardiac evaluation of normal and abnormal mice embryonic hearts. This approach can accurately reveal cardiac structure and, thus, increases the yield of animal model in congenital heart defect research. PMID:27569369

  13. Comparative analysis of several sediment transport formulations applied to dam-break flows over erodible beds

    NASA Astrophysics Data System (ADS)

    Cea, Luis; Bladé, Ernest; Corestein, Georgina; Fraga, Ignacio; Espinal, Marc; Puertas, Jerónimo

    2014-05-01

    Transitory flows generated by dam failures have a great sediment transport capacity, which induces important morphological changes on the river topography. Several studies have been published regarding the coupling between the sediment transport and hydrodynamic equations in dam-break applications, in order to correctly model their mutual interaction. Most of these models solve the depth-averaged shallow water equations to compute the water depth and velocity. On the other hand, a wide variety of sediment transport formulations have been arbitrarily used to compute the topography evolution. These are based on semi-empirical equations which have been calibrated under stationary and uniform conditions very different from those achieved in dam-break flows. Soares-Frazao et al. (2012) proposed a Benchmark test consisting of a dam-break over a mobile bed, in which several teams of modellers participated using different numerical models, and concluded that the key issue which still needs to be investigated in morphological modelling of dam-break flows is the link between the solid transport and the hydrodynamic variables. This paper presents a comparative analysis of different sediment transport formulations applied to dam-break flows over mobile beds. All the formulations analysed are commonly used in morphological studies in rivers, and include the formulas of Meyer-Peter & Müller (1948), Wong-Parker (2003), Einstein-Brown (1950), van Rijn (1984), Engelund-Hansen (1967), Ackers-White (1973), Yang (1973), and a Meyer-Peter & Müller type formula but with ad-hoc coefficients. The relevance of corrections on the sediment flux direction and magnitude due to the bed slope and the non-equilibrium hypothesis is also analysed. All the formulations have been implemented in the numerical model Iber (Bladé et al. (2014)), which solves the depth-averaged shallow water equations coupled to the Exner equation to evaluate the bed evolution. Two different test cases have been studied. The first one is the benchmark case presented in Soares-Frazao et al. (2012), and consists in an instanteneous dam-break flow over a sand bed. The second one corresponds to the experimental studies performed at the Engineering Faculty of the UNAM (Fuentes-Mariles et al. (2010)) and consists in the erosion of a volcanic sand dike by an overtopping flow. In both cases experimental measurements of water depth and bed evolution are available to evaluate the performance of different sediment transport formulations. A sensitivity analysis to the physical properties of the bed material (grain density and size) is also presented for each formulation, in order to analyse to which degree the properties of the bed material need to be defined in the numerical model. References Bladé, E., Cea, L., Corestein, G., Escolano, E., Puertas, J., Vázquez-Cendón, M.E., Dolz, J., Coll, A. (2014). Iber: herramienta de simulación numérica del flujo en ríos. Revista Internacional de Métodos Numéricos para Cálculo y Diseño en Ingeniería, Vol.30(1), pp.1-10 Fuentes-Mariles, Ó. A., Cruz-Gerón, J. A., Rivera-Díaz, C., Luna-Cruz, F., and González-Prado, J. (2010). "Caracterización Experimental de Ruptura de Diques." XXIV Congreso Latinoamericano de Hidráulica Soares-Frazão et al. (2012). Dambreak flows over mobile beds: experiments and benchmark tests for numerical models. Journal of Hydraulic Research, Vol.50(4), pp.364-375

  14. Flood prevention dams for arid regions at a micro-scale sub-catchment, case study: Tabuk, Saudi Arabia.

    PubMed

    Abushandi, Eyad

    2016-12-01

    Unexpected flash flooding is one of the periodic hydrological problems affecting the city of Tabuk in Saudi Arabia. The region has high potential for floods as it suffers high rainfall intensity in a short time and also has high urbanization rates and topographic complexity. Constructing flood prevention dams is one option to solve this problem. A cost-effective design requires a detailed feasibility study and analysis for the selection of suitable sites. The aim of this study was to develop a method for selecting a suitable site for flood protection dams in the Abu Saba'a district, the most affected part of the city of Tabuk during the flash flood in January 2013. Spatial analysis was applied using Landsat Thematic Mapper images and Shuttle Radar Topography Mission digital elevation model to select a site in the Abu Saba'a area. A simple model using ArcGIS was built including all suggested parameters. The results showed the best site for a dam was 2 km distance backfrom the area, where all parameter values matched. The results showed that the dynamic properties of land cover can affect site selection. It is therefore suggested that more field and hydrological data should be gathered for greater accuracy.

  15. Assessing the potential hydrological impact of the Gibe III Dam on Lake Turkana water level using multi-source satellite data

    USGS Publications Warehouse

    Velpuri, Naga Manohar; Senay, Gabriel B.

    2012-01-01

    Lake Turkana, the largest desert lake in the world, is fed by ungauged or poorly gauged river systems. To meet the demand of electricity in the East African region, Ethiopia is currently building the Gibe III hydroelectric dam on the Omo River, which supplies more than 80% of the inflows to Lake Turkana. On completion, the Gibe III dam will be the tallest dam in Africa with a height of 241 m. However, the nature of interactions and potential impacts of regulated inflows to Lake Turkana are not well understood due to its remote location and unavailability of reliable in-situ datasets. In this study, we used 12 years (1998–2009) of existing multi-source satellite and model-assimilated global weather data. We use calibrated multi-source satellite data-driven water balance model for Lake Turkana that takes into account model routed runoff, lake/reservoir evapotranspiration, direct rain on lakes/reservoirs and releases from the dam to compute lake water levels. The model evaluates the impact of Gibe III dam using three different approaches such as (a historical approach, a knowledge-based approach, and a nonparametric bootstrap resampling approach) to generate rainfall-runoff scenarios. All the approaches provided comparable and consistent results. Model results indicated that the hydrological impact of the dam on Lake Turkana would vary with the magnitude and distribution of rainfall post-dam commencement. On average, the reservoir would take up to 8–10 months, after commencement, to reach a minimum operation level of 201 m depth of water. During the dam filling period, the lake level would drop up to 2 m (95% confidence) compared to the lake level modelled without the dam. The lake level variability caused by regulated inflows after the dam commissioning were found to be within the natural variability of the lake of 4.8 m. Moreover, modelling results indicated that the hydrological impact of the Gibe III dam would depend on the initial lake level at the time of dam commencement. Areas along the Lake Turkana shoreline that are vulnerable to fluctuations in lake levels were also identified. This study demonstrates the effectiveness of using existing multi-source satellite data in a basic modeling framework to assess the potential hydrological impact of an upstream dam on a terminal downstream lake. The results obtained from this study could also be used to evaluate alternate dam-filling scenarios and assess the potential impact of the dam on Lake Turkana under different operational strategies.

  16. Inflow forecasting model construction with stochastic time series for coordinated dam operation

    NASA Astrophysics Data System (ADS)

    Kim, T.; Jung, Y.; Kim, H.; Heo, J. H.

    2014-12-01

    Dam inflow forecasting is one of the most important tasks in dam operation for an effective water resources management and control. In general, dam inflow forecasting with stochastic time series model is possible to apply when the data is stationary because most of stochastic process based on stationarity. However, recent hydrological data cannot be satisfied the stationarity anymore because of climate change. Therefore a stochastic time series model, which can consider seasonality and trend in the data series, named SARIMAX(Seasonal Autoregressive Integrated Average with eXternal variable) model were constructed in this study. This SARIMAX model could increase the performance of stochastic time series model by considering the nonstationarity components and external variable such as precipitation. For application, the models were constructed for four coordinated dams on Han river in South Korea with monthly time series data. As a result, the models of each dam have similar performance and it would be possible to use the model for coordinated dam operation.Acknowledgement This research was supported by a grant 'Establishing Active Disaster Management System of Flood Control Structures by using 3D BIM Technique' [NEMA-NH-12-57] from the Natural Hazard Mitigation Research Group, National Emergency Management Agency of Korea.

  17. Modeling Total Dissolved Gas for Optimal Operation of Multireservoir Systems

    DOE PAGES

    Politano, Marcela; Castro, Alejandro; Hadjerioua, Boualem

    2017-02-09

    One important environmental issue of hydropower in the Columbia and Snake River Basins (Pacific Northwest region of United States) is elevated total dissolved gas (TDG) downstream of a dam, which has the potential to cause gas bubble disease in affected fish. Gas supersaturation in the Columbia River Basin primarily occurs due to dissolution of bubbles entrained during spill events. This paper presents a physically based TDG model that can be used to optimize spill operations in multireservoir hydropower systems. Independent variables of the model are forebay TDG, tailwater elevation, spillway and powerhouse discharges, project head, and environmental parameters such asmore » temperature and atmospheric pressure. The model contains seven physically meaningful experimental parameters, which were calibrated and validated against TDG data collected downstream of Rock Island Dam (Washington) from 2008 to 2012. In conclusion, a sensitivity analysis was performed to increase the understanding of the relationships between TDG downstream of the dam and processes such as air entrainment, lateral powerhouse flow, and dissolution.« less

  18. Lost opportunities and future avenues to reconcile hydropower and sediment transport in the Mekong Basin through optimal sequencing of dam portfolios.

    NASA Astrophysics Data System (ADS)

    Castelletti, A.; Schmitt, R. J. P.; Bizzi, S.; Kondolf, G. M.

    2017-12-01

    Dams are essential to meet growing water and energy demands. While dams cumulatively impact downstream rivers on network-scales, dam development is mostly based on ad-hoc economic and environmental assessments of single dams. Here, we provide evidence that replacing this ad-hoc approach with early strategic planning of entire dam portfolios can greatly reduce conflicts between economic and environmental objectives of dams. In the Mekong Basin (800,000km2), 123 major dam sites (status-quo: 56 built and under construction) could generate 280,000 GWh/yr of hydropower. Cumulatively, dams risk interrupting the basin's sediment dynamics with severe impacts on livelihoods and eco-systems. To evaluate cumulative impacts and benefits of the ad-hoc planned status-quo portfolio, we combine the CASCADE sediment connectivity model with data on hydropower production and sediment trapping at each dam site. We couple CASCADE to a multi-objective genetic algorithm (BORG) identifying a) portfolios resulting in an optimal trade-off between cumulative sediment trapping and hydropower production and b) an optimal development sequence for each portfolio. We perform this analysis first for the pristine basin (i.e., without pre-existing dams) and then starting from the status-quo portfolio, deriving policy recommendations for which dams should be prioritized in the near future. The status-quo portfolio creates a sub-optimal trade-off between hydropower and sediment trapping, exploiting 50 % of the basin's hydro-electric potential and trapping 60 % of the sediment load. Alternative optimal portfolios could have produced equivalent hydropower for 30 % sediment trapping. Imminent development of mega-dams in the lower basin will increase hydropower production by 20 % but increase sediment trapping to >90 %. In contrast, following an optimal development sequence can still increase hydropower by 30 % with limited additional sediment trapping by prioritizing dams in upper parts of the basin. Our findings argue for reconsidering some imminent dam developments in the Mekong. With nearly 3000 dams awaiting development world-wide, results from the Mekong are of global importance, demonstrating that strategic planning and sequencing of dams is instrumental for sustainable development of dams and hydropower.

  19. Potential of modified flow-release rules for Kingsley Dam in meeting crane habitat requirements, Platte River, Nebraska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shen, H.W.; Hiew, K.L.; Loubser, E.

    1985-11-01

    The Whooping Crane, an endangered species, uses the Platte River downstream from Overton, Nebraska in its migratory route. Maintenance of favorable habitat conditions required by law may mean restrictions on development and management of Colorado's entitled water in the South Platte River. The project investigated meeting crane habitat flow requirements by alternative plans for flow releases through Kingsley Dam (North Platte River) and Narrows Dam (a proposed project on the South Platte River). The analysis is based on mean monthly flow of the past 39 years. Irrigation releases were held firm, hydroelectric power production was maximized, and flows available tomore » meet habitat requirements were determined. A simulation model was developed to model the operation of the North Platte and South Platte Rivers.« less

  20. DAM_Explorer: A Modeling Framework for Assessing the Physical Response of Streams to Dam Removal

    DTIC Science & Technology

    2009-06-01

    ERDC TN-EMRRP-SR-65 1 DAM_Explorer: A Modeling Framework for Assessing the Physical Response of Streams to Dam Removal By Jock Conyngham1 and...physical and temporal increments for staged removals) is anticipated. POINTS OF CONTACT For additional information contact Jock N. Conyngham (406-541

  1. Anthropocene streams and base-level controls from historic dams in the unglaciated mid-Atlantic region, USA

    USGS Publications Warehouse

    Merritts, Dorothy; Walter, Robert; Rahnis, Michael; Hartranft, Jeff; Cox, Scott; Gellis, Allen; Potter, Noel; Hilgartner, William; Langland, Michael; Manion, Lauren; Lippincott, Caitlin; Siddiqui, Sauleh; Rehman, Zain; Scheid, Chris; Kratz, Laura; Shilling, Andrea; Jenschke, Matthew; Datin, Katherine; Cranmer, Elizabeth; Reed, Austin; Matuszewski, Derek; Voli, Mark; Ohlson, Erik; Neugebauer, Ali; Ahamed, Aakash; Neal, Conor; Winter, Allison; Becker, Steven

    2011-01-01

    Recently, widespread valley-bottom damming for water power was identified as a primary control on valley sedimentation in the mid-Atlantic US during the late seventeenth to early twentieth century. The timing of damming coincided with that of accelerated upland erosion during post-European settlement land-use change. In this paper, we examine the impact of local drops in base level on incision into historic reservoir sediment as thousands of ageing dams breach. Analysis of lidar and field data indicates that historic milldam building led to local base-level rises of 2-5 m (typical milldam height) and reduced valley slopes by half. Subsequent base-level fall with dam breaching led to an approximate doubling in slope, a significant base-level forcing. Case studies in forested, rural as well as agricultural and urban areas demonstrate that a breached dam can lead to stream incision, bank erosion and increased loads of suspended sediment, even with no change in land use. After dam breaching, key predictors of stream bank erosion include number of years since dam breach, proximity to a dam and dam height. One implication of this work is that conceptual models linking channel condition and sediment yield exclusively with modern upland land use are incomplete for valleys impacted by milldams. With no equivalent in the Holocene or late Pleistocene sedimentary record, modern incised stream-channel forms in the mid-Atlantic region represent a transient response to both base-level forcing and major changes in land use beginning centuries ago. Similar channel forms might also exist in other locales where historic milling was prevalent.

  2. A Study of the Impact of Dams on Streamflow and Sediment Retention in the Mekong River Basin

    NASA Astrophysics Data System (ADS)

    Munroe, T.; Anderson, E.; Markert, K. N.; Griffin, R.

    2017-12-01

    Dam construction in the Mekong Basin has many cascading effects on the ecology, economy, and hydrology of the surrounding region. Current studies that assess the hydrological impact of dams in the region focus on only one or a small subset (<10) of dams. The focus of this study is to utilize the Soil Water Assessment Tool (SWAT), a rainfall-runoff hydrologic model to determine change in streamflow and sedimentation in the Mekong Basin before and after the construction of dams. This study uses land cover land use and reservoir datasets created by the NASA SERVIR-Mekong Regional Land Cover Monitoring System and Dam Inundation Mapping Tool as inputs into the model. The study also builds on the capabilities of the SWAT model by using the sediment trapping efficiency (STE) equation from Brune (1953), rewritten by Kummu (2007), to calculate STE of dams and estimate change in sediment concentration downstream. The outputs from this study can be used to inform dam operation policies, study the correlation between dams and delta subsidence, and study the impact of dams on river fisheries, which are all pressing issues in the Mekong region.

  3. A simplified water temperature model for the Colorado River below Glen Canyon Dam

    USGS Publications Warehouse

    Wright, S.A.; Anderson, C.R.; Voichick, N.

    2009-01-01

    Glen Canyon Dam, located on the Colorado River in northern Arizona, has affected the physical, biological and cultural resources of the river downstream in Grand Canyon. One of the impacts to the downstream physical environment that has important implications for the aquatic ecosystem is the transformation of the thermal regime from highly variable seasonally to relatively constant year-round, owing to hypolimnetic releases from the upstream reservoir, Lake Powell. Because of the perceived impacts on the downstream aquatic ecosystem and native fish communities, the Glen Canyon Dam Adaptive Management Program has considered modifications to flow releases and release temperatures designed to increase downstream temperatures. Here, we present a new model of monthly average water temperatures below Glen Canyon Dam designed for first-order, relatively simple evaluation of various alternative dam operations. The model is based on a simplified heat-exchange equation, and model parameters are estimated empirically. The model predicts monthly average temperatures at locations up to 421 km downstream from the dam with average absolute errors less than 0.58C for the dataset considered. The modelling approach used here may also prove useful for other systems, particularly below large dams where release temperatures are substantially out of equilibrium with meteorological conditions. We also present some examples of how the model can be used to evaluate scenarios for the operation of Glen Canyon Dam.

  4. Modeling Potential Surface and Shallow Groundwater Storage Provided by Beaver Ponds Across Watersheds

    NASA Astrophysics Data System (ADS)

    Hafen, K.; Wheaton, J. M.; Macfarlane, W.

    2016-12-01

    Damming of streams by North American Beaver (Castor canadensis) has been shown to provide a host of potentially desirable hydraulic and hydrologic impacts. Notably, increases in surface water storage and groundwater storage may alter the timing and delivery of water around individual dams and dam complexes. Anecdotal evidence suggests these changes may be important for increasing and maintaining baseflow and even helping some intermittent streams flow perennially. In the arid west, these impacts could be particularly salient in the face of climate change. However, few studies have examined the hydrologic impacts of beaver dams at scales large enough to provide insight for water management, in part because understanding or modeling these impacts at large spatial scales has been precluded by uncertainty concerning the number of beaver dams a drainage network can support. Using the recently developed Beaver Restoration Assessment Tool (BRAT) to identify possible densities and spatial configurations of beaver dams, we developed a model that predicts the area and volume of surface water storage associated with dams of various sizes, and applied this model at different dam densities across multiple watersheds (HUC12) in northern Utah. We then used model results as inputs to the MODFLOW groundwater model to identify the subsequent changes to shallow groundwater storage. The spatially explicit water storage estimates produced by our approach will be useful in evaluating potential beaver restoration and conservation, and will also provide necessary information for developing hydrologic models to specifically identify the effects beaver dams may have on water delivery and timing.

  5. A pre-dam-removal assessment of sediment transport for four dams on the Kalamazoo River between Plainwell and Allegan, Michigan

    USGS Publications Warehouse

    Syed, Atiq U.; Bennett, James P.; Rachol, Cynthia M.

    2005-01-01

    Four dams on the Kalamazoo River between the cities of Plainwell and Allegan, Mich., are in varying states of disrepair. The Michigan Department of Environmental Quality (MDEQ) and U.S. Environmental Protection Agency (USEPA) are considering removing these dams to restore the river channels to pre-dam conditions. This study was initiated to identify sediment characteristics, monitor sediment transport, and predict sediment resuspension and deposition under varying hydraulic conditions. The mathematical model SEDMOD was used to simulate streamflow and sediment transport using three modeling scenarios: (1) sediment transport simulations for 730 days (Jan. 2001 to Dec. 2002), with existing dam structures, (2) sediment transport simulations based on flows from the 1947 flood at the Kalamazoo River with existing dam structures, and (3) sediment transport simulations based on flows from the 1947 flood at the Kalamazoo River with dams removed. Sediment transport simulations based on the 1947 flood hydrograph provide an estimate of sediment transport rates under maximum flow conditions. These scenarios can be used as an assessment of the sediment load that may erode from the study reach at this flow magnitude during a dam failure. The model was calibrated using suspended sediment as a calibration parameter and root mean squared error (RMSE) as an objective function. Analyses of the calibrated model show a slight bias in the model results at flows higher than 75 m3/s; this means that the model-simulated suspended-sediment transport rates are higher than the observed rates; however, the overall calibrated model results show close agreement between simulated and measured values of suspended sediment. Simulation results show that the Kalamazoo River sediment transport mechanism is in a dynamic equilibrium state. Model results during the 730-day simulations indicate significant sediment erosion from the study reach at flow rates higher than 55 m3/s. Similarly, significant sediment deposition occurs during low to average flows (monthly mean flows between 25.49 m3/s and 50.97 m3/s) after a high-flow event. If the flow continues to stay in the low to average range the system shifts towards equilibrium, resulting in a balancing effect between sediment deposition and erosion rates. The 1947 flood-flow simulations show approximately 30,000 m3 more instream sediments erosion for the first 21 days of the dams removed scenario than for the existing-dams scenario, with the same initial conditions for both scenarios. Application of a locally weighted regression smoothing (LOWESS) function to simulation results of the dams removed scenario indicates a steep downtrend with high sediment transport rates during the first 21 days. In comparison, the LOWESS curve for the existing-dams scenario shows a smooth transition of sediment transport rates in response to the change in streamflow. The high erosion rates during the dams-removed scenario are due to the absence of the dams; in contrast, the presence of dams in the existing-dams scenario helps reduce sediment erosion to some extent. The overall results of 60-day simulations for the 1947 flood show no significant difference in total volume of eroded sediment between the two scenarios, because the dams in the study reach have low heads and no control gates. It is important to note that the existing-dams and dams-removed scenarios simulations are run for only 60 days; therefore, the simulations take into account the changes in sediment erosion and deposition rates only during that time period. Over an extended period, more erosion of instream sediments would be expected to occur if the dams are not properly removed than under the existing conditions. On the basis of model simulations, removal of dams would further lower the head in all the channels. This lowering of head could produce higher flow velocities in the study reach, which ultimately would result in accelerated erosion rates.

  6. Incremental Dynamic Analysis of Koyna Dam under Repeated Ground Motions

    NASA Astrophysics Data System (ADS)

    Zainab Nik Azizan, Nik; Majid, Taksiah A.; Nazri, Fadzli Mohamed; Maity, Damodar; Abdullah, Junaidah

    2018-03-01

    This paper discovers the incremental dynamic analysis (IDA) of concrete gravity dam under single and repeated earthquake loadings to identify the limit state of the dam. Seven ground motions with horizontal and vertical direction as seismic input considered in the nonlinear dynamic analysis based on the real repeated earthquake in the worldwide. All the ground motions convert to respond spectrum and scaled according to the developed elastic respond spectrum in order to match the characteristic of the ground motion to the soil type. The scaled was depends on the fundamental period, T1 of the dam. The Koyna dam has been selected as a case study for the purpose of the analysis by assuming that no sliding and rigid foundation, has been estimated. IDA curves for Koyna dam developed for single and repeated ground motions and the performance level of the dam identifies. The IDA curve of repeated ground motion shown stiffer rather than single ground motion. The ultimate state displacement for a single event is 45.59mm and decreased to 39.33mm under repeated events which are decreased about 14%. This showed that the performance level of the dam based on seismic loadings depend on ground motion pattern.

  7. Evaluation of Groundwater Leakage into a Drainage Tunnel in Jinping-I Arch Dam Foundation in Southwestern China: A Case Study

    NASA Astrophysics Data System (ADS)

    Chen, Yi-Feng; Hong, Jia-Min; Zheng, Hua-Kang; Li, Yi; Hu, Ran; Zhou, Chuang-Bing

    2016-03-01

    The Jinping-I double-curvature arch dam, located in the middle reach of Yalong River and with a maximum height of 305 m, is the world's highest dam of this type that has been completed. Since the second stage of reservoir impounding, after which the reservoir water level was gradually raised by about 232 m, a significant amount of leakage was observed from the drainage holes drilled in the lowest drainage tunnel at the left bank abutment at an elevation of 1595 m a.s.l. (above sea level), with an observed maximum pressure of about 0.3 MPa. A number of investigations, including water quality analysis, digital borehole imaging, tunnel geological mapping, and in situ groundwater monitoring, were performed to examine the source of leaking, the groundwater flow paths, and the performance of the grouting curtains. By defining two objective functions using the in situ time series measurements of flow rate and hydraulic head, respectively, a multiobjective inverse modeling procedure was proposed to evaluate the permeability of the foundation rocks that was underestimated in the design stage. This procedure takes advantage of the orthogonal design, finite element forward modeling of the transient groundwater flow, artificial neural network, and non-dominated sorting genetic algorithm, hence significantly reducing the computational cost and improving the reliability of the inversed results. The geological structures that lead to the leakage were identified and the seepage flow behaviors in the dam foundation and the left bank abutment were assessed. Based on the field measurements and the inverse modeling results, the effects of the engineering treatments of the leakage event on the dam safety were analyzed. It has been demonstrated that the seepage control system is effective in lowering the groundwater level and limiting the amount of seepage in the dam foundation, and the leakage event does not pose a threat to the safety of the dam.

  8. Sediment Transport and Deposition Resulting from a Dam-Removal Sediment Pulse: Milltown Dam, Clark Fork River, MT

    NASA Astrophysics Data System (ADS)

    Wilcox, A. C.

    2010-12-01

    The removal of Milltown Dam in 2008 from the Clark Fork River, Montana, USA, lowered base level at the dam site by 9 m and triggered erosion of nearly 600,000 metric tons of predominantly fine reservoir sediment. Bedload and bed-material sampling, repeat topographic surveys, sediment transport modeling, geochemical fingerprinting of downstream sediments, and Lidar analysis have all been applied to study the upstream and downstream effects of the dam removal. In the years since dam breaching, successive years with similar peak flows (3-year recurrence interval) were followed by a third year with below-average runoff. Nearly all of the documented reservoir erosion occurred in the first year, when sand and silt was eroded and transported downstream. In subsequent years, minimal reservoir erosion occurred, in part as a result of active management to prevent further reservoir erosion, but coarse material eroded from the reservoir has dispersed downstream. Upstream responses in this system have been strongly mediated by Superfund remediation activities in Milltown Reservoir, in which over two million metric tons of contaminated sediments have been mechanically excavated. Downstream aggradation has been limited in the main channel but was initially substantial in bars and side channels of a multi-thread reach 21 to 25 km downstream of the dam site, suggesting that channel change has been influenced far more by the antecedent depositional environment than by proximity to the source of the sediment pulse. Comparison of observed erosion with pre-removal modeling shows that reservoir erosion exceeded model predictions by two orders of magnitude in the unconfined Clark Fork arm of the reservoir. In addition, fine reservoir sediments predicted to move exclusively in suspension traveled as bedload at lower transport stages. The resulting fine sediment deposition in substrate interstices, on bars, and in side channels of the gravel- and cobble-bed Clark Fork River is the most significant and lasting change to downstream geomorphic and ecological systems.

  9. Potential effects of ongoing and proposed hydropower development on terrestrial biological diversity in the Indian Himalaya.

    PubMed

    Pandit, Maharaj K; Grumbine, R Edward

    2012-12-01

    Indian Himalayan basins are earmarked for widespread dam building, but aggregate effects of these dams on terrestrial ecosystems are unknown. We mapped distribution of 292 dams (under construction and proposed) and projected effects of these dams on terrestrial ecosystems under different scenarios of land-cover loss. We analyzed land-cover data of the Himalayan valleys, where dams are located. We estimated dam density on fifth- through seventh-order rivers and compared these estimates with current global figures. We used a species-area relation model (SAR) to predict short- and long-term species extinctions driven by deforestation. We used scatter plots and correlation studies to analyze distribution patterns of species and dams and to reveal potential overlap between species-rich areas and dam sites. We investigated effects of disturbance on community structure of undisturbed forests. Nearly 90% of Indian Himalayan valleys would be affected by dam building and 27% of these dams would affect dense forests. Our model projected that 54,117 ha of forests would be submerged and 114,361 ha would be damaged by dam-related activities. A dam density of 0.3247/1000 km(2) would be nearly 62 times greater than current average global figures; the average of 1 dam for every 32 km of river channel would be 1.5 times higher than figures reported for U.S. rivers. Our results show that most dams would be located in species-rich areas of the Himalaya. The SAR model projected that by 2025, deforestation due to dam building would likely result in extinction of 22 angiosperm and 7 vertebrate taxa. Disturbance due to dam building would likely reduce tree species richness by 35%, tree density by 42%, and tree basal cover by 30% in dense forests. These results, combined with relatively weak national environmental impact assessment and implementation, point toward significant loss of species if all proposed dams in the Indian Himalaya are constructed. ©2012 Society for Conservation Biology.

  10. Dam removal: Listening in

    Treesearch

    M. M. Foley; J. R. Bellmore; J. E. O' Connor; J. J. Duda; A. E. East; G. E. Grant; C. W. Anderson; J. A. Bountry; M. J. Collins; P. J. Connolly; L. S. Craig; J. E. Evans; S. L. Greene; F. J. Magilligan; C. S. Magirl; J. J. Major; G. R. Pess; T. J. Randle; P. B. Shafroth; C. E. Torgersen; D. Tullos; A. C. Wilcox

    2017-01-01

    Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings....

  11. The social impacts of dams: A new framework for scholarly analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kirchherr, Julian, E-mail: julian.kirchherr@sant.ox.ac.uk; Charles, Katrina J., E-mail: katrina.charles@ouce.ox.ac.uk

    No commonly used framework exists in the scholarly study of the social impacts of dams. This hinders comparisons of analyses and thus the accumulation of knowledge. The aim of this paper is to unify scholarly understanding of dams' social impacts via the analysis and aggregation of the various frameworks currently used in the scholarly literature. For this purpose, we have systematically analyzed and aggregated 27 frameworks employed by academics analyzing dams' social impacts (found in a set of 217 articles). A key finding of the analysis is that currently used frameworks are often not specific to dams and thus omitmore » key impacts associated with them. The result of our analysis and aggregation is a new framework for scholarly analysis (which we call ‘matrix framework’) specifically on dams' social impacts, with space, time and value as its key dimensions as well as infrastructure, community and livelihood as its key components. Building on the scholarly understanding of this topic enables us to conceptualize the inherently complex and multidimensional issues of dams' social impacts in a holistic manner. If commonly employed in academia (and possibly in practice), this framework would enable more transparent assessment and comparison of projects.« less

  12. Analysis of dam-passage survival of yearling and subyearling Chinook salmon and juvenile steelhead at The Dalles Dam, Oregon, 2010

    USGS Publications Warehouse

    Beeman, John W.; Kock, Tobias J.; Perry, Russell W.; Smith, Steven G.

    2011-01-01

    We performed a series of analyses of mark-recapture data from a study at The Dalles Dam during 2010 to determine if model assumptions for estimation of juvenile salmonid dam-passage survival were met and if results were similar to those using the University of Washington's newly developed ATLAS software. The study was conducted by the Pacific Northwest National Laboratory and used acoustic telemetry of yearling Chinook salmon, juvenile steelhead, and subyearling Chinook salmon released at three sites according to the new virtual/paired-release statistical model. This was the first field application of the new model, and the results were used to measure compliance with minimum survival standards set forth in a recent Biological Opinion. Our analyses indicated that most model assumptions were met. The fish groups mixed in time and space, and no euthanized tagged fish were detected. Estimates of reach-specific survival were similar in fish tagged by each of the six taggers during the spring, but not in the summer. Tagger effort was unevenly allocated temporally during tagging of subyearling Chinook salmon in the summer; the difference in survival estimates among taggers was more likely a result of a temporal trend in actual survival than of tagger effects. The reach-specific survival of fish released at the three sites was not equal in the reaches they had in common for juvenile steelhead or subyearling Chinook salmon, violating one model assumption. This violation did not affect the estimate of dam-passage survival, because data from the common reaches were not used in its calculation. Contrary to expectation, precision of survival estimates was not improved by using the most parsimonious model of recapture probabilities instead of the fully parameterized model. Adjusting survival estimates for differences in fish travel times and tag lives increased the dam-passage survival estimate for yearling Chinook salmon by 0.0001 and for juvenile steelhead by 0.0004. The estimate was unchanged for subyearling Chinook salmon. The tag-life-adjusted dam-passage survival estimates from our analyses were 0.9641 (standard error [SE] 0.0096) for yearling Chinook salmon, 0.9534 (SE 0.0097) for juvenile steelhead, and 0.9404 (SE 0.0091) for subyearling Chinook salmon. These were within 0.0001 of estimates made by the University of Washington using the ATLAS software. Contrary to the intent of the virtual/paired-release model to adjust estimates of the paired-release model downward in order to account for differential handling mortality rates between release groups, random variation in survival estimates may result in an upward adjustment of survival relative to estimates from the paired-release model. Further investigation of this property of the virtual/paired-release model likely would prove beneficial. In addition, we suggest that differential selective pressures near release sites of the two control groups could bias estimates of dam-passage survival from the virtual/paired-release model.

  13. Sensitivity of Water-Energy Nexus to dam operation: A Water-Energy Productivity concept.

    PubMed

    Basheer, Mohammed; Elagib, Nadir Ahmed

    2018-03-01

    Understanding and modelling the complex nature of interlinkages between water and energy are essential for efficient use of the two resources. Hydropower storage dams represent an interesting example of the water-energy interdependencies since they are often multipurpose. The concept of Water-Energy Productivity (WEP), defined as the amount of energy produced per unit of water lost in the process, is introduced in this study to illustrate the relationship between energy generation and water losses by examining the sensitivity of the Water-Energy Nexus (WEN) to changing dam operation policy. This concept is demonstrated by developing a water allocation model of the White Nile in Sudan, including Jebel Aulia Dam (JAD), using a general river and reservoir simulation software called RiverWare. A number of 77 operation scenarios of JAD are examined for 30 hydrologic years (1980-2009), considering reducing the Full Supply Level (FSL) gradually from its current value to the minimum possible value, increasing the Minimum Operating Level (MOL) gradually to the maximum possible level, and operating the dam at a Constant Operating Level (COL). The results show that raising the operating level does not necessarily increase the WEP. In comparison to the current policy, the analysis shows that a maximum WEP of 32.6GWh/BCM (GWh/Billion Cubic Meters) would be reached by raising the MOL to 375masl (meters above sea level), resulting in an increase in average annual energy generation to 164.6GWh (+18.1%) at the expense of an annual water loss of 5.05BCM (+12.7%). Even though this operation policy results in a more efficient water use compared to the original operation policy, a basin-wide assessment that includes all hydropower storage dams in the Nile basin should be conducted to decide on where and how much energy should be generated. The present analysis and future examination of the multi-dimensions of the WEN in the context of dam operation are imperative to improve the decision making in the quest for efficient resource use and management. Copyright © 2017 Elsevier B.V. All rights reserved.

  14. Assessment of check-dam groundwater recharge with water-balance calculations

    NASA Astrophysics Data System (ADS)

    Djuma, Hakan; Bruggeman, Adriana; Camera, Corrado; Eliades, Marinos

    2017-04-01

    Studies on the enhancement of groundwater recharge by check-dams in arid and semi-arid environments mainly focus on deriving water infiltration rates from the check-dam ponding areas. This is usually achieved by applying simple water balance models, more advanced models (e.g., two dimensional groundwater models) and field tests (e.g., infiltrometer test or soil pit tests). Recharge behind the check-dam can be affected by the built-up of sediment as a result of erosion in the upstream watershed area. This natural process can increase the uncertainty in the estimates of the recharged water volume, especially for water balance calculations. Few water balance field studies of individual check-dams have been presented in the literature and none of them presented associated uncertainties of their estimates. The objectives of this study are i) to assess the effect of a check-dam on groundwater recharge from an ephemeral river; and ii) to assess annual sedimentation at the check-dam during a 4-year period. The study was conducted on a check-dam in the semi-arid island of Cyprus. Field campaigns were carried out to measure water flow, water depth and check-dam topography in order to establish check-dam water height, volume, evaporation, outflow and recharge relations. Topographic surveys were repeated at the end of consecutive hydrological years to estimate the sediment built up in the reservoir area of the check dam. Also, sediment samples were collected from the check-dam reservoir area for bulk-density analyses. To quantify the groundwater recharge, a water balance model was applied at two locations: at the check-dam and corresponding reservoir area, and at a 4-km stretch of the river bed without check-dam. Results showed that a check-dam with a storage capacity of 25,000 m3 was able to recharge to the aquifer, in four years, a total of 12 million m3 out of the 42 million m3 of measured (or modelled) streamflow. Recharge from the analyzed 4-km long river section without check-dam was estimated to be 1 million m3. Upper and lower limits of prediction intervals were computed to assess the uncertainties of the results. The model was rerun with these values and resulted in recharge values of 0.4 m3 as lower and 38 million m3 as upper limit. The sediment survey in the check-dam reservoir area showed that the reservoir area was filled with 2,000 to 3,000 tons of sediment after one rainfall season. This amount of sediment corresponds to 0.2 to 2 t h-1 y-1 sediment yield at the watershed level and reduces the check-dam storage capacity by approximately 10%. Results indicate that check-dams are valuable structures for increasing groundwater resources, but special attention should be given to soil erosion occurring in the upstream area and the resulting sediment built-up in the check-dam reservoir area. This study has received funding from the EU FP7 RECARE Project (GA 603498)

  15. GC51D-0831: A Study of the Impact of Dams on Sediment Retention in the Mekong River Basin

    NASA Technical Reports Server (NTRS)

    Munroe, Thailynn; Griffin, Robert; Anderson, Eric; Markert, Kel

    2017-01-01

    Dam construction in the Mekong Basin has many cascading effects on the ecology, economy, and hydrology of the surrounding region. The focus of this study is to utilize the Soil Water Assessment Tool (SWAT), developed at Texas A & M, a rainfall-runoff hydrologic model to determine change in sedimentation in the Mekong Basin after the construction of dams. This study uses land cover land use and reservoir datasets created by the NASA SERVIR-Mekong Regional Land Cover Monitoring System and Dam Inundation Mapping Tool as inputs into the model. The study also builds on the capabilities of the SWAT model by using the sediment trapping efficiency (STE) equation from Brune (1953), rewritten by Kummu & Varis (2007), to calculate STE of dams and estimate change in sediment concentration downstream. The outputs from this study can be used to inform dam operation policies, study the correlation between dams and delta subsidence, and study the impact of dams on river fisheries, which are all pressing issues in the Mekong region.

  16. Geophysical Investigations at Hidden Dam, Raymond, California: Summary of Fieldwork and Data Analysis

    USGS Publications Warehouse

    Minsley, Burke J.; Burton, Bethany L.; Ikard, Scott; Powers, Michael H.

    2010-01-01

    Geophysical field investigations have been carried out at the Hidden Dam in Raymond, California for the purpose of better understanding the hydrogeology and seepage-related conditions at the site. Known seepage areas on the northwest right abutment area of the downstream side of the dam are documented by Cedergren. Subsequent to the 1980 seepage study, a drainage blanket with a subdrain system was installed to mitigate downstream seepage. Flow net analysis provided by Cedergren suggests that the primary seepage mechanism involves flow through the dam foundation due to normal reservoir pool elevations, which results in upflow that intersects the ground surface in several areas on the downstream side of the dam. In addition to the reservoir pool elevations and downstream surface topography, flow is also controlled by the existing foundation geology as well as the presence or absence of a horizontal drain within the downstream portion of the dam. The purpose of the current geophysical work is to (1) identify present-day seepage areas that may not be evident due to the effectiveness of the drainage blanket in redirecting seepage water, and (2) provide information about subsurface geologic structures that may control subsurface flow and seepage. These tasks are accomplished through the use of two complementary electrical geophysical methods, self-potentials (SP) and direct-current (DC) electrical resistivity, which have been commonly utilized in dam-seepage studies. SP is a passive method that is primarily sensitive to active subsurface groundwater flow and seepage, whereas DC resistivity is an active-source method that is sensitive to changes in subsurface lithology and groundwater saturation. The focus of this field campaign was on the downstream area on the right abutment, or northwest side of the dam, as this is the main area of interest regarding seepage. Two exploratory self-potential lines were also collected on the downstream left abutment of the dam to identify potential seepage in that area. This report is primarily a summary of the field geophysical data acquisition, with some preliminary results and interpretation. Further work will involve a more rigorous analysis of the geophysical datasets and an examination of a large dataset of historical observations of water levels in a number of observation wells and piezometers compared with reservoir elevation. In addition, a partially saturated flow model will be developed to better understand seepage patterns given the available information about dam construction, geophysical results, and data from installed observation wells and piezometers.

  17. Research on the water resources regulation ability model of dams in the Huai He River Basin considering ecological and management factors

    NASA Astrophysics Data System (ADS)

    Shui, Y.; Liu, H. C.; Li, L. H.; Yu, G. G.; Liu, J.

    2016-08-01

    Research that assesses the scheduling ability of dams gamers a great deal of attention due to the global water resource crisis. These studies can provide useful and practical suggestions for scheduling the water resources of dams to solve problems, such as addressing ecological water needs and so on. Recent studies have primarily evaluated the schedule ability of dams according to their quantifiable attributes, such as water quantity, flow velocity, etc. However, the ecological and management status can directly determine the possibility and efficiency of a dam's water resource scheduling. This paper presents an evaluation model to assess the scheduling capacity of dams that takes into consideration ecological and management factors. In the experiment stage, this paper takes the Sha Ying river of the Huai He River Basin as an example to evaluate the scheduling ability of its dams. The results indicate that the proposed evaluation model can provide more precise and practical suggestions.

  18. Air demand estimation in bottom outlets with the particle finite element method. Susqueda Dam case study

    NASA Astrophysics Data System (ADS)

    Salazar, Fernando; San-Mauro, Javier; Celigueta, Miguel Ángel; Oñate, Eugenio

    2017-07-01

    Dam bottom outlets play a vital role in dam operation and safety, as they allow controlling the water surface elevation below the spillway level. For partial openings, water flows under the gate lip at high velocity and drags the air downstream of the gate, which may cause damages due to cavitation and vibration. The convenience of installing air vents in dam bottom outlets is well known by practitioners. The design of this element depends basically on the maximum air flow through the air vent, which in turn is a function of the specific geometry and the boundary conditions. The intrinsic features of this phenomenon makes it hard to analyse either on site or in full scaled experimental facilities. As a consequence, empirical formulas are frequently employed, which offer a conservative estimate of the maximum air flow. In this work, the particle finite element method was used to model the air-water interaction in Susqueda Dam bottom outlet, with different gate openings. Specific enhancements of the formulation were developed to consider air-water interaction. The results were analysed as compared to the conventional design criteria and to information gathered on site during the gate operation tests. This analysis suggests that numerical modelling with the PFEM can be helpful for the design of this kind of hydraulic works.

  19. Assessment of 21st century drought conditions at Shasta Dam based on dynamically projected water supply conditions by a regional climate model coupled with a physically-based hydrology model.

    PubMed

    Trinh, T; Ishida, K; Kavvas, M L; Ercan, A; Carr, K

    2017-05-15

    Along with socioeconomic developments, and population increase, natural disasters around the world have recently increased the awareness of harmful impacts they cause. Among natural disasters, drought is of great interest to scientists due to the extraordinary diversity of their severity and duration. Motivated by the development of a potential approach to investigate future possible droughts in a probabilistic framework based on climate change projections, a methodology to consider thirteen future climate projections based on four emission scenarios to characterize droughts is presented. The proposed approach uses a regional climate model coupled with a physically-based hydrology model (Watershed Environmental Hydrology Hydro-Climate Model; WEHY-HCM) to generate thirteen equally likely future water supply projections. The water supply projections were compared to the current water demand for the detection of drought events and estimation of drought properties. The procedure was applied to Shasta Dam watershed to analyze drought conditions at the watershed outlet, Shasta Dam. The results suggest an increasing water scarcity at Shasta Dam with more severe and longer future drought events in some future scenarios. An important advantage of the proposed approach to the probabilistic analysis of future droughts is that it provides the drought properties of the 100-year and 200-year return periods without resorting to any extrapolation of the frequency curve. Copyright © 2017 Elsevier B.V. All rights reserved.

  20. Land use change impacts on discharge analysis using SWAT model at Ciherang Pondok DAM catchment area

    NASA Astrophysics Data System (ADS)

    Utamahadi, M. A.; Pandjaitan, N. H.; Rau, M. I.

    2018-05-01

    The prompt increase of population influenced the requirement for new regions to fulfill people’s primary needs. Its increased land use change and caused many impacts on the environment, including watersheds as well. Ciherang Pondok DAM catchment area is part of Cisadane watershed and was selected as the research area. This research aimed to analyse the water supply and water discharge change caused by the Urban Planning (RTRW) in 2020. The analysis was conducted using soil and water assessment tools (SWAT) model. Stages of this research were catchment area delineation, HRU identification, calibration and validation of models, and prediction of discharge and water demand. The result showed that RTRW of 2020 increased the maximum discharge of 1.6 m3/s and decreased the minimum discharge of 0.01 m3/s, hence the maximum and minimum discharge ratio increased 0.26% from 2016. Output discharge in 2020 at Ciherang Pondok Dam Catchment Area was classified as well, with discharge of 6.72 – 126.2 m3/s, and could fulfil water demand. For the best result, it is better to use climate data from weather stations inside the study area and it is required an improvement in data archiving system.

  1. Are Wind Power and Hydropower Complements or Competitors? An Analysis of Ecosystem Service Constraints in the Roanoke Basin

    NASA Astrophysics Data System (ADS)

    Reed, P. M.; Fernandez, A. R.; Blumsack, S.

    2011-12-01

    Hydropower can provide inexpensive, flexible fill-in power to compensate for intermittent renewable generation. Policies for hydropower dams maintain multiple services beyond electric generation, including environmental protection, flood control and recreation. We model the decision of a hydroelectric generator to shift some of its power production capacity away from the day-ahead energy market into a "wind-following" service that smoothes the intermittent production of wind turbines. Offering such a service imposes both private and social opportunity costs. Since fluctuations in wind energy output are not perfectly correlated with day-ahead energy prices, a wind-following service will necessarily affect generator revenues. Seasonal wind patterns produce conflicts with the goal of managing rivers for "ecosystem services" - the maintenance or enhancement of downstream ecosystems. We illustrate our decision model using the Kerr Dam in PJM's territory in North Carolina. We simulate the operation of Kerr Dam over a three-year period that features hydrologic variability from normal water years to extreme drought conditions. We use an optimization framework to estimate reservation prices for Kerr Dam offering wind-following services in the PJM market. Wind-following may be profitable for Kerr Dam at low capacity levels during some time periods if ecosystems services are neglected and if side payments, or reserves-type payments, are provided. Wind-following with ecosystem services yields revenue losses that typically cannot be recovered with reserves market payments. Water release patterns are inconsistent with ecosystem-services goals when Kerr Dam dedicates significant capacity to wind-following, particularly in drought years.

  2. Hydroeconomic Analysis of the Balance between Renewable Wind Energy, Hydropower, and Ecosystems Services in the Roanoke River Basin

    NASA Astrophysics Data System (ADS)

    Fernandez, A.; Blumsack, S.; Reed, P.

    2012-04-01

    Hydropower can provide inexpensive, flexible fill-in power to compensate for intermittent renewable generation. Policies for hydropower dams maintain multiple services beyond electric generation, including environmental protection, flood control and recreation. We model the decision of a hydroelectric generator to shift some of its power production capacity away from the day-ahead energy market into a "wind-following" service that smoothes the intermittent production of wind turbines. Offering such a service imposes both private and social opportunity costs. Since fluctuations in wind energy output are not perfectly correlated with day-ahead energy prices, a wind-following service will necessarily affect generator revenues. Seasonal wind patterns produce conflicts with the goal of managing rivers for "ecosystem services" - the maintenance or enhancement of downstream ecosystems. We illustrate our decision model using the Kerr Dam in PJM's territory in North Carolina. We simulate the operation of Kerr Dam over a three-year period that features hydrologic variability from normal water years to extreme drought conditions. We use an optimization framework to estimate reservation prices for Kerr Dam offering wind-following services in the PJM market. Wind-following may be profitable for Kerr Dam at low capacity levels during some time periods if ecosystems services are neglected and if side payments, or reserves-type payments, are provided. Wind-following with ecosystem services yields revenue losses that typically cannot be recovered with reserves market payments. Water release patterns are inconsistent with ecosystem-services goals when Kerr Dam dedicates significant capacity to wind-following, particularly in drought years.

  3. Accidental Water Pollution Risk Analysis of Mine Tailings Ponds in Guanting Reservoir Watershed, Zhangjiakou City, China.

    PubMed

    Liu, Renzhi; Liu, Jing; Zhang, Zhijiao; Borthwick, Alistair; Zhang, Ke

    2015-12-02

    Over the past half century, a surprising number of major pollution incidents occurred due to tailings dam failures. Most previous studies of such incidents comprised forensic analyses of environmental impacts after a tailings dam failure, with few considering the combined pollution risk before incidents occur at a watershed-scale. We therefore propose Watershed-scale Tailings-pond Pollution Risk Analysis (WTPRA), designed for multiple mine tailings ponds, stemming from previous watershed-scale accidental pollution risk assessments. Transferred and combined risk is embedded using risk rankings of multiple routes of the "source-pathway-target" in the WTPRA. The previous approach is modified using multi-criteria analysis, dam failure models, and instantaneous water quality models, which are modified for application to multiple tailings ponds. The study area covers the basin of Gutanting Reservoir (the largest backup drinking water source for Beijing) in Zhangjiakou City, where many mine tailings ponds are located. The resultant map shows that risk is higher downstream of Gutanting Reservoir and in its two tributary basins (i.e., Qingshui River and Longyang River). Conversely, risk is lower in the midstream and upstream reaches. The analysis also indicates that the most hazardous mine tailings ponds are located in Chongli and Xuanhua, and that Guanting Reservoir is the most vulnerable receptor. Sensitivity and uncertainty analyses are performed to validate the robustness of the WTPRA method.

  4. Accidental Water Pollution Risk Analysis of Mine Tailings Ponds in Guanting Reservoir Watershed, Zhangjiakou City, China

    PubMed Central

    Liu, Renzhi; Liu, Jing; Zhang, Zhijiao; Borthwick, Alistair; Zhang, Ke

    2015-01-01

    Over the past half century, a surprising number of major pollution incidents occurred due to tailings dam failures. Most previous studies of such incidents comprised forensic analyses of environmental impacts after a tailings dam failure, with few considering the combined pollution risk before incidents occur at a watershed-scale. We therefore propose Watershed-scale Tailings-pond Pollution Risk Analysis (WTPRA), designed for multiple mine tailings ponds, stemming from previous watershed-scale accidental pollution risk assessments. Transferred and combined risk is embedded using risk rankings of multiple routes of the “source-pathway-target” in the WTPRA. The previous approach is modified using multi-criteria analysis, dam failure models, and instantaneous water quality models, which are modified for application to multiple tailings ponds. The study area covers the basin of Gutanting Reservoir (the largest backup drinking water source for Beijing) in Zhangjiakou City, where many mine tailings ponds are located. The resultant map shows that risk is higher downstream of Gutanting Reservoir and in its two tributary basins (i.e., Qingshui River and Longyang River). Conversely, risk is lower in the midstream and upstream reaches. The analysis also indicates that the most hazardous mine tailings ponds are located in Chongli and Xuanhua, and that Guanting Reservoir is the most vulnerable receptor. Sensitivity and uncertainty analyses are performed to validate the robustness of the WTPRA method. PMID:26633450

  5. National Dam Safety Program. Elm Creek Dam (Dam Number 16), (Inventory Number N.Y. 593), Conewango Creek Watershed, Allegheny River Basin, Cattaraugus County, New York. Phase I Inspection Report,

    DTIC Science & Technology

    1981-08-18

    HYDRAULICS/HYDROLOGY 5.1 Drainage Area Characteristics 5-1 5.2 Design Data 5-1 5.3 Analysis Criteria 5-1 5.4 Reservoir Capacity 5-2 5.5 Experience...Data 5-2 5.6 Overtopping Potential 5-2 5.7 Analysis of Downstream Impacts 5-2 5.8 Evaluation 5-2 SECTION 6 STRUCTURAL STABILITY 6.1 Visual Observations...elevation is 1587.0 ft. (MSL). 5.3 Analysis Criteria The analysis of the spillway capacity of the dam and the storage of the reservoir was performed using

  6. Sustainability of dams-an evaluation approach

    NASA Astrophysics Data System (ADS)

    Petersson, E.

    2003-04-01

    Situated in the stream bed of a river, dams and reservoirs interrupt the natural hydrological cycle. They are very sensitive to all kinds of changes in the catchment, among others global impacts on land use, climate, settlement structures or living standards. Vice versa dams strongly affect the spatially distributed, complex system of ecology, economy and society in the catchment both up- and downstream of the reservoir. The occurrence of negative impacts due to large dams led to serious conflicts about future dams. Nevertheless, water shortages due to climatic conditions and their changes, that are faced by enormous water and energy demands due to rising living standards of a growing world population, seem to require further dam construction, even if both supply and demand management are optimised. Although environmental impact assessments are compulsory for dams financed by any of the international funding agencies, it has to be assumed that the projects lack sustainability. Starting from an inventory of today's environmental impact assessments as an integral part of a feasibility study the presentation will identify their inadequacies with regard to the sustainability of dams. To improve the sustainability of future dams and avoid the mistakes of the past, the planning procedures for dams have to be adapted. The highly complex and dynamical system of interrelated physical and non-physical processes, that involves many different groups of stakeholders, constitutes the need for a model-oriented decision support system. In line with the report of the World Commission of Dams an integrated analysis and structure of the complex interrelations between dams, ecology, economy and society will be presented. Thus the system, that a respective tool will be based on, is analysed. Furthermore an outlook will be given on the needs of the potential users of a DSS and how it has to be embedded in the overall planning process. The limits of computer-based decision-support in the very specific context of dam construction will be identified. Special focus will be on the constraints arising from the need to jointly evaluate qualitative and quantitative aspects and the methodological potential of multi-criteria evaluation in this respect.

  7. Integrated Data-Archive and Distributed Hydrological Modelling System for Optimized Dam Operation

    NASA Astrophysics Data System (ADS)

    Shibuo, Yoshihiro; Jaranilla-Sanchez, Patricia Ann; Koike, Toshio

    2013-04-01

    In 2012, typhoon Bopha, which passed through the southern part of the Philippines, devastated the nation leaving hundreds of death tolls and significant destruction of the country. Indeed the deadly events related to cyclones occur almost every year in the region. Such extremes are expected to increase both in frequency and magnitude around Southeast Asia, during the course of global climate change. Our ability to confront such hazardous events is limited by the best available engineering infrastructure and performance of weather prediction. An example of the countermeasure strategy is, for instance, early release of reservoir water (lowering the dam water level) during the flood season to protect the downstream region of impending flood. However, over release of reservoir water affect the regional economy adversely by losing water resources, which still have value for power generation, agricultural and industrial water use. Furthermore, accurate precipitation forecast itself is conundrum task, due to the chaotic nature of the atmosphere yielding uncertainty in model prediction over time. Under these circumstances we present a novel approach to optimize contradicting objectives of: preventing flood damage via priori dam release; while sustaining sufficient water supply, during the predicted storm events. By evaluating forecast performance of Meso-Scale Model Grid Point Value against observed rainfall, uncertainty in model prediction is probabilistically taken into account, and it is then applied to the next GPV issuance for generating ensemble rainfalls. The ensemble rainfalls drive the coupled land-surface- and distributed-hydrological model to derive the ensemble flood forecast. Together with dam status information taken into account, our integrated system estimates the most desirable priori dam release through the shuffled complex evolution algorithm. The strength of the optimization system is further magnified by the online link to the Data Integration and Analysis System, a Japanese national project for collecting, integrating and analyzing massive amount of global scale observation data, meaning that the present system is applicable worldwide. We demonstrate the integrated system with observed extreme events in Angat Watershed, the Philippines, and Upper Tone River basin, Japan. The results show promising performance for operational use of the system to support river and dam managers' decision-making.

  8. Calculated hydrographs for unsteady research flows at selected sites along the Colorado River downstream from Glen Canyon Dam, Arizona, 1990 and 1991

    USGS Publications Warehouse

    Griffin, Eleanor R.; Wiele, Stephen M.

    1996-01-01

    A one-dimensional model of unsteady discharge waves was applied to research flowr that were released from Glen Canyon Dam in support of the Glen Canyon Environmental Studies. These research flows extended over periods of 11 days during which the discharge followed specific, regular patterns repeated on a daily cycle that were similar to the daily releases for power generation. The model was used to produce discharge hydrographs at 38 selected sites in Marble and Grand Canyons for each of nine unsteady flows released from the dam in 1990 and 1991. In each case, the discharge computed from stage measurements and the associated stage-discharge relation at the streamflow-gaging station just below the dam (09379910 Colorado River Hlow Glen Canyon Dam) was routed to Diamond Creek, which is 386 kilometers downstream. Steady and unsteady tributary inflows downstream from the dam were included in the model calculations. Steady inflow to the river from tributaries downstream from the dam was determined for each case by comparing the steady base flow preceding and following the unsteady flow measured at six streamflow-gaging stations between Glen Canyon Dam and Diamond Creek. During three flow periods, significant unsteady inflow was received from the Paria River, or the Little Colorado River, or both. The amount and timing of unsteady inflow was determined using the discharge computed from records of streamflow-gaging stations on the tributaries. Unsteady flow then was added to the flow calculated by the model at the appropriate location. Hydrographs were calculated using the model at 5 streamflow-gaging stations downstream from the dam and at 33 beach study sites. Accuracy of model results was evaluated by comparing the results to discharge hydrographs computed from the records of the five streamflow-gaging stations between Lees Ferry and Lake Mead. Results show that model predictions of wave speed and shape agree well with data from the five streamflow-gaging stations.

  9. Soil erosion and sediment yield, a double barrel problem in South Africa's only large river network without a dam

    NASA Astrophysics Data System (ADS)

    Le Roux, Jay

    2016-04-01

    Soil erosion not only involves the loss of fertile topsoil but is also coupled with sedimentation of dams, a double barrel problem in semi-arid regions where water scarcity is frequent. Due to increasing water requirements in South Africa, the Department of Water and Sanitation is planning water resource development in the Mzimvubu River Catchment, which is the only large river network in the country without a dam. Two dams are planned including a large irrigation dam and a hydropower dam. However, previous soil erosion studies indicate that large parts of the catchment is severely eroded. Previous studies, nonetheless, used mapping and modelling techniques that represent only a selection of erosion processes and provide insufficient information about the sediment yield. This study maps and models the sediment yield comprehensively by means of two approaches over a five-year timeframe between 2007 and 2012. Sediment yield contribution from sheet-rill erosion was modelled with ArcSWAT (a graphical user interface for SWAT in a GIS), whereas gully erosion contributions were estimated using time-series mapping with SPOT 5 imagery followed by gully-derived sediment yield modelling in a GIS. Integration of the sheet-rill and gully results produced a total sediment yield map, with an average of 5 300 t km-2 y-1. Importantly, the annual average sediment yield of the areas where the irrigation dam and hydropower dam will be built is around 20 000 t km-2 y-1. Without catchment rehabilitation, the life expectancy of the irrigation dam and hydropower dam could be 50 and 40 years respectively.

  10. Qualitative simulation of bathymetric changes due to reservoir sedimentation: A Japanese case study.

    PubMed

    Bilal, Ahmed; Dai, Wenhong; Larson, Magnus; Beebo, Qaid Naamo; Xie, Qiancheng

    2017-01-01

    Sediment-dynamics modeling is a useful tool for estimating a dam's lifespan and its cost-benefit analysis. Collecting real data for sediment-dynamics analysis from conventional field survey methods is both tedious and expensive. Therefore, for most rivers, the historical record of data is either missing or not very detailed. Available data and existing tools have much potential and may be used for qualitative prediction of future bathymetric change trend. This study shows that proxy approaches may be used to increase the spatiotemporal resolution of flow data, and hypothesize the river cross-sections and sediment data. Sediment-dynamics analysis of the reach of the Tenryu River upstream of Sakuma Dam in Japan was performed to predict its future bathymetric changes using a 1D numerical model (HEC-RAS). In this case study, only annually-averaged flow data and the river's longitudinal bed profile at 5-year intervals were available. Therefore, the other required data, including river cross-section and geometry and sediment inflow grain sizes, had to be hypothesized or assimilated indirectly. The model yielded a good qualitative agreement, with an R2 (coefficient of determination) of 0.8 for the observed and simulated bed profiles. A predictive simulation demonstrated that the useful life of the dam would end after the year 2035 (±5 years), which is in conformity with initial detailed estimates. The study indicates that a sediment-dynamic analysis can be performed even with a limited amount of data. However, such studies may only assess the qualitative trends of sediment dynamics.

  11. Assessing survival of Mid-Columbia River released juvenile salmonids at McNary Dam, Washington, 2008-09

    USGS Publications Warehouse

    Evans, Scott D.; Walker, Christopher E.; Brewer, Scott J.; Adams, Noah S.

    2010-01-01

    Few studies have evaluated survival of juvenile salmon over long river reaches in the Columbia River and information regarding the survival of sockeye salmon at lower Columbia River dams is lacking. To address these information gaps, the U.S. Geological Survey was contracted by the U.S. Army Corps of Engineers to evaluate the possibility of using tagged fish released in the Mid-Columbia River to assess passage and survival at and downstream of McNary Dam. Using the acoustic telemetry systems already in place for a passage and survival study at McNary Dam, fish released from the tailraces of Wells, Rocky Reach, Rock Island, Wanapum, and Priest Rapids Dams were detected at McNary Dam and at the subsequent downstream arrays. These data were used to generate route-specific survival probabilities using single-release models from fish released in the Mid-Columbia River. We document trends in passage and survival probabilities at McNary Dam for yearling Chinook and sockeye salmon and juvenile steelhead released during studies in the Mid-Columbia River. Trends in the survival and passage of these juvenile salmonid species are presented and discussed. However, comparisons made across years and between study groups are not possible because of differences in the source of the test fish, the type of acoustic tags used, the absence of the use of passive integrated transponder tags in some of the release groups, differences in tagging and release protocols, annual differences in dam operations and configurations, differences in how the survival models were constructed (that is, number of routes that could be estimated given the number of fish detected), and the number and length of reaches included in the analysis (downstream reach length and arrays). Despite these differences, the data we present offer a unique opportunity to examine the migration behavior and survival of a group of fish that otherwise would not be studied. This is particularly true for sockeye salmon because little information is available about their survival as they pass hydroelectric dams in the lower Columbia River. Collecting information on fish released in the Mid-Columbia River, as well as on fish released 8 kilometers upstream of McNary Dam, allowed us to evaluate similarities and differences in passage and survival probabilities. In general, juvenile salmonids released in the Mid-Columbia River and detected at and downstream of McNary Dam showed trends in passage and survival probabilities that were similar to fish released 8 kilometers upstream of McNary Dam. This suggests that increased migration time or length of migration had little effect on behavior and survival of Mid-Columbia River released juvenile salmonids detected at McNary Dam.

  12. Fish navigation of large dams emerges from their modulation of flow field experience

    PubMed Central

    Goodwin, R. Andrew; Politano, Marcela; Garvin, Justin W.; Nestler, John M.; Hay, Duncan; Anderson, James J.; Weber, Larry J.; Dimperio, Eric; Smith, David L.; Timko, Mark

    2014-01-01

    Navigating obstacles is innate to fish in rivers, but fragmentation of the world’s rivers by more than 50,000 large dams threatens many of the fish migrations these waterways support. One limitation to mitigating the impacts of dams on fish is that we have a poor understanding of why some fish enter routes engineered for their safe travel around the dam but others pass through more dangerous routes. To understand fish movement through hydropower dam environments, we combine a computational fluid dynamics model of the flow field at a dam and a behavioral model in which simulated fish adjust swim orientation and speed to modulate their experience to water acceleration and pressure (depth). We fit the model to data on the passage of juvenile Pacific salmonids (Oncorhynchus spp.) at seven dams in the Columbia/Snake River system. Our findings from reproducing observed fish movement and passage patterns across 47 flow field conditions sampled over 14 y emphasize the role of experience and perception in the decision making of animals that can inform opportunities and limitations in living resources management and engineering design. PMID:24706826

  13. Hard choices in assessing survival past dams — a comparison of single- and paired-release strategies

    USGS Publications Warehouse

    Zydlewski, Joseph D.; Stich, Daniel S.; Sigourney, Douglas B.

    2017-01-01

    Mark–recapture models are widely used to estimate survival of salmon smolts migrating past dams. Paired releases have been used to improve estimate accuracy by removing components of mortality not attributable to the dam. This method is accompanied by reduced precision because (i) sample size is reduced relative to a single, large release; and (ii) variance calculations inflate error. We modeled an idealized system with a single dam to assess trade-offs between accuracy and precision and compared methods using root mean squared error (RMSE). Simulations were run under predefined conditions (dam mortality, background mortality, detection probability, and sample size) to determine scenarios when the paired release was preferable to a single release. We demonstrate that a paired-release design provides a theoretical advantage over a single-release design only at large sample sizes and high probabilities of detection. At release numbers typical of many survival studies, paired release can result in overestimation of dam survival. Failures to meet model assumptions of a paired release may result in further overestimation of dam-related survival. Under most conditions, a single-release strategy was preferable.

  14. Analysis of Causes of Uplift Anomalies in the Čierny Váh Subsoil

    NASA Astrophysics Data System (ADS)

    Bednárová, Emília; Grambličková, Danka; Škvarka, Juraj; Majerčák, Vlastimil; Slávik, Ivan

    2017-12-01

    The pumped storage hydropower plant of Čierny Váh was created by means of damming up the valley of the Čierny Váh River. The dam is 18.5 m high above terrain and 375 m long in the dam’s crest. Total capacity of the reservoir is 5.1 million m3. Complicated geological conditions in the subsoil of dam’s body - fractured dolomite with local occurrence of tectonic breccia and clays, with the occurrence of intense disturbances - called for the construction of the grouting curtain in the dam’s subsoil. Its depth is about 20 in the area of the riverine plain, and about 60 m in the areas of abutments. During foregoing operations of the structure, more than 30 years, local anomalies in the uplift development in the right abutment’s subsoil of the lower reservoir dam were recorded. Their abnormally high values on the downstream side of grouting curtain have become the subject of extensive discussion and a stimulus for its remediation. To ensure reliable operation of the hydraulic structure a comprehensive analysis of the impact of the long-term operation of the reservoir on the dam safety was carried out. This included an examination of the causes of anomalous development of uplifts using FEM numerical modelling. The paper presents obtained results from this analysis.

  15. TSSGNEO suggestions for refinement of safety criteria for dam at the Sayano-Shushenskaya HPP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Savich, A. I.; Gaziev, E. G.

    2013-09-15

    Analysis of radial-displacements of the dam, measured by direct and inverted plumb lines, indicates that curves of the variation in radial displacements of the dam at different elevations make it possible to plot diagrams of increases in the radial displacement over the entire height of the dam, i.e., inclines of the axis of the dam to the vertical.

  16. Long-term trend analysis on total and extreme precipitation over Shasta Dam watershed.

    PubMed

    Toride, Kinya; Cawthorne, Dylan L; Ishida, Kei; Kavvas, M Levent; Anderson, Michael L

    2018-06-01

    California's interconnected water system is one of the most advanced water management systems in the world, and understanding of long-term trends in atmospheric and hydrologic behavior has increasingly being seen as vital to its future well-being. Knowledge of such trends is hampered by the lack of long-period observation data and the uncertainty surrounding future projections of atmospheric models. This study examines historical precipitation trends over the Shasta Dam watershed (SDW), which lies upstream of one of the most important components of California's water system, Shasta Dam, using a dynamical downscaling methodology that can produce atmospheric data at fine time-space scales. The Weather Research and Forecasting (WRF) model is employed to reconstruct 159years of long-term hourly precipitation data at 3km spatial resolution over SDW using the 20th Century Reanalysis Version 2c dataset. Trend analysis on this data indicates a significant increase in total precipitation as well as a growing intensity of extreme events such as 1, 6, 12, 24, 48, and 72-hour storms over the period of 1851 to 2010. The turning point of the increasing trend and no significant trend periods is found to be 1940 for annual precipitation and the period of 1950 to 1960 for extreme precipitation using the sequential Mann-Kendall test. Based on these analysis, we find the trends at the regional scale do not necessarily apply to the watershed-scale. The sharp increase in the variability of annual precipitation since 1970s is also detected, which implies an increase in the occurrence of extreme wet and dry conditions. These results inform long-term planning decisions regarding the future of Shasta Dam and California's water system. Copyright © 2018 Elsevier B.V. All rights reserved.

  17. National Dam Safety Program. Lock 2 Dam at Mechanicville (I.D. Number NY 988) Upper Hudson River Basin, Rensselaer-Saratoga County, New York. Phase I Inspection Report,

    DTIC Science & Technology

    1980-09-30

    municipalities of Warrensburg, Glens Falls, Hudson Falls, Saratoga Springs; Arlington, Vermont ; Greenwich, Schuylerville, Cambridge; Bennington ...of Vermont and Massachusetts. the Hudson River main stem travels approximately 140 miles from its headquarters south of Lake Placid to the Lock 2 Dam... Vermont ; Adams, North Adams, and Williamstown, Massachusetts; and Hoosick Falls. 5.2 ANALYSIS CRITERIA The analysis of the spillway capacity of the dam

  18. Simulation analysis of temperature control on RCC arch dam of hydropower station

    NASA Astrophysics Data System (ADS)

    XIA, Shi-fa

    2017-12-01

    The temperature analysis of roller compacted concrete (RCC) dam plays an important role in their design and construction. Based on three-dimensional finite element method, in the computation of temperature field, many cases are included, such as air temperature, elevated temperature by cement hydration heat, concrete temperature during placing, the influence of water in the reservoir, and boundary temperature. According to the corresponding parameters of RCC arch dam, the analysis of temperature field and stress field during the period of construction and operation is performed. The study demonstrates that detailed thermal stress analysis should be performed for RCC dams to provide a basis to minimize and control the occurrence of thermal cracking.

  19. Earthern embankment overtopping analysis using the WinDAM B software

    USDA-ARS?s Scientific Manuscript database

    Over 11,000 small watershed dams have been constructed with USDA involvement over an eighty year period. WinDAM B software has been developed to help engineers address dam safety concerns relative to potential overtopping of these earthen embankments. The primary function of the software is threef...

  20. Transplacental cocaine exposure. 1: A rodent model.

    PubMed

    Wilkins, A S; Genova, L M; Posten, W; Kosofsky, B E

    1998-01-01

    To characterize the transplacental effects of cocaine on the developing brain, we have developed a mouse model of gestational cocaine exposure. Pharmacokinetic analysis revealed that cocaine and its metabolites (BE, BNE, and NC) were found in fetal brain and plasma at 30 and 120 min following SC administration to embryonic day (E) 17 pregnant Swiss Webster mice. Pregnant dams injected twice daily with cocaine HCl at 20 mg/kg SC from gestational day E8 to E17 (COC) demonstrated less food intake and lower percentage weight gain than vehicle-injected dams allowed access to food ad lib (SAL). A nutritionally paired control group of dams injected with saline vehicle and pair-fed with the COC dams (SPF) demonstrated the lowest percentage weight gain of all three groups. The surrogate fostered offspring of COC and SPF dams demonstrated persistent growth retardation [on postnatal days (P) 1, P9, and P50] and transient brain growth retardation (on P1 and P9) when compared to pups born to SAL dams. We conducted behavioral tests that allowed us to dissociate the indirect effect of cocaine-induced malnutrition from a direct effect of prenatal cocaine administration in altering postnatal behavior. Pups from all three groups were tested for first-order Pavlovian conditioning on P9 or P12, or for the ability to ignore redundant information in a blocking paradigm on P50 or P100. Unlike the SPF and SAL controls, COC mice (i.e., mice born to COC dams) were unable to acquire an aversion to an odor previously paired with shock on P9. This learning deficit was transient because on P12, COC mice trained on the same conditioning task displayed an aversion to the odor that was indistinguishable from the SPF and SAL controls. P50 and P100 COC mice (and to a lesser extent, SPF mice) demonstrated a persistent behavioral deficit in the blocking paradigm, which may reflect alterations in selective attention. We discuss how these findings in our rodent model have developmental implications for human infants exposed to cocaine in utero.

  1. Recovery of sockeye salmon in the Elwha River, Washington, after dam removal: Dependence of smolt production on the resumption of anadromy by landlocked kokanee

    USGS Publications Warehouse

    Hansen, Adam G.; Gardner, Jennifer R.; Beauchamp, David A.; Paradis, Rebecca; Quinn, Thomas P.

    2016-01-01

    Pacific salmon Oncorhynchus spp. are adept at colonizing habitat that has been reopened to anadromous passage. Sockeye Salmon O. nerka are unique in that most populations require lakes to fulfill their life history. Thus, for Sockeye Salmon to colonize a system, projects like dam removals must provide access to lakes. However, if the lakes contain landlocked kokanee (lacustrine Sockeye Salmon), the recovery of Sockeye Salmon could be mediated by interactions between the two life history forms and the processes associated with the resumption of anadromy. Our objective was to evaluate the extent to which estimates of Sockeye Salmon smolt production and recovery are sensitive to the resumption of anadromy by kokanee after dam removal. We informed the analysis based on the abiotic and biotic features of Lake Sutherland, which was recently opened to passage after dam removal on the Elwha River, Washington. We first developed maximum expectations for the smolt-producing capacity of Lake Sutherland by using two predictive models developed from Sockeye Salmon populations in Alaska and British Columbia: one model was based on the mean seasonal biomass of macrozooplankton, and the other was based on the euphotic zone volume of the lake. We then constructed a bioenergetics-based simulation model to evaluate how the capacity of Lake Sutherland to rear yearling smolts could change with varying degrees of anadromy among O. nerka fry. We demonstrated that (1) the smolt-producing capacity of a nursery lake for juvenile Sockeye Salmon changes in nonlinear ways with changes in smolt growth, mortality, and the extent to which kokanee resume anadromy after dam removal; (2) kokanee populations may be robust to changes in abundance after dam removal, particularly if lakes are located higher in the watershed on tributaries separate from where dams were removed; and (3) the productivity of newly establishing Sockeye Salmon can vary considerably depending on whether the population becomes rearing limited or is recruitment limited and depending on how adult escapement is managed.

  2. The Design and Analysis of Salmonid Tagging Studies in the Columbia Basin : Volume II: Experiment Salmonid Survival with Combined PIT-CWT Tagging.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Newman, Ken

    1997-06-01

    Experiment designs to estimate the effect of transportation on survival and return rates of Columbia River system salmonids are discussed along with statistical modeling techniques. Besides transportation, river flow and dam spill are necessary components in the design and analysis otherwise questions as to the effects of reservoir drawdowns and increased dam spill may never be satisfactorily answered. Four criteria for comparing different experiment designs are: (1) feasibility, (2) clarity of results, (3) scope of inference, and (4) time to learn. In this report, alternative designs for conducting experimental manipulations of smolt tagging studies to study effects of river operationsmore » such as flow levels, spill fractions, and transporting outmigrating salmonids around dams in the Columbia River system are presented. The principles of study design discussed in this report have broad implications for the many studies proposed to investigate both smolt and adult survival relationships. The concepts are illustrated for the case of the design and analysis of smolt transportation experiments. The merits of proposed transportation studies should be measured relative to these principles of proper statistical design and analysis.« less

  3. Measurement of Dam Deformations: Case Study of Obruk Dam (Turkey)

    NASA Astrophysics Data System (ADS)

    Gulal, V. Engin; Alkan, R. Metin; Alkan, M. Nurullah; İlci, Veli; Ozulu, I. Murat; Tombus, F. Engin; Kose, Zafer; Aladogan, Kayhan; Sahin, Murat; Yavasoglu, Hakan; Oku, Guldane

    2016-04-01

    In the literature, there is information regarding the first deformation and displacement measurements in dams that were conducted in 1920s Switzerland. Todays, deformation measurements in the dams have gained very different functions with improvements in both measurement equipment and evaluation of measurements. Deformation measurements and analysis are among the main topics studied by scientists who take interest in the engineering measurement sciences. The Working group of Deformation Measurements and Analysis, which was established under the International Federation of Surveyors (FIG), carries out its studies and activities with regard to this subject. At the end of the 1970s, the subject of the determination of fixed points in the deformation monitoring network was one of the main subjects extensively studied. Many theories arose from this inquiry, as different institutes came to differing conclusions. In 1978, a special commission with representatives of universities has been established within the FIG 6.1 working group; this commission worked on the issue of determining a general approach to geometric deformation analysis. The results gleaned from the commission were discussed at symposiums organized by the FIG. In accordance with these studies, scientists interested in the subject have begun to work on models that investigate cause and effect relations between the effects that cause deformation and deformation. As of the scientist who interest with the issue focused on different deformation methods, another special commission was established within the FIG engineering measurements commission in order to classify deformation models and study terminology. After studying this material for a long time, the official commission report was published in 2001. In this prepared report, studies have been carried out by considering the FIG Engineering Surveying Commission's report entitled, 'MODELS AND TERMINOLOGY FOR THE ANALYSIS OF GEODETIC MONITORING OBSERVATIONS'. In October of 2015, geodetic deformation measurements were conducted by considering FIG reports related to deformation measurements and German DIN 18710 Engineering Measurements norms in the Çorum province of Turkey. The main purpose of the study is to determine optimum measurement and evaluation methods that will be used to specify movements in the horizontal and vertical directions for the fill dam. For this purpose; • In reference networks consisting of 8 points, measurements were performed by using long-term dual-frequency GNSS receivers for duration of 8 hours. • GNSS measurements were conducted in varying times between 30 minutes and 120 minutes at the 44 units object points on the body of the dam. • Two repetitive measurements of real time kinematic (RTK) GNSS were conducted at the object points on dam. • Geometric leveling measurements were performed between reference and object points. • Trigonometric leveling measurements were performed between reference and object points. • Polar measurements were performed between references and object points. GNSS measurements performed at reference points of the monitoring network for 8 hours have been evaluated by using GAMIT software in accordance with the IGS points in the region. In this manner, regional and local movements in the network can be determined. It is aimed to determine measurement period which will provide 1-2mm accuracy that expected in local GNSS network by evaluating GNSS measurements performed on body of dam. Results will be compared by offsetting GNSS and terrestrial measurements. This study will investigate whether or not there is increased accuracy provided by GNSS measurements carried out among reference points without the possibility of vision.

  4. Using a coupled eco-hydrodynamic model to predict habitat for target species following dam removal

    USGS Publications Warehouse

    Tomsic, C.A.; Granata, T.C.; Murphy, R.P.; Livchak, C.J.

    2007-01-01

    A habitat suitability index (HSI) model was developed for a water quality sensitive fish (Greater Redhorse) and macroinvertebrate (Plecoptera) species to determine the restoration success of the St. John Dam removal for the Sandusky River (Ohio). An ArcGIS?? model was created for pre- and post-dam removal scenarios. Inputs to the HSI model consist of substrate distributions from river surveys, and water level and velocity time series, outputs from a hydrodynamic model. The ArcGIS?? model predicted habitat suitability indices at 45 river cross-sections in the hydrodynamic model. The model was programmed to produce polygon layers, using graphical user interfaces that were displayed in the ArcGIS?? environment. The results of the model clearly show an increase of habitat suitability from pre- to post-dam removal periods and in the former reservoir. The change in suitability of the model is attributed mostly to the change in depth in the river following the dam removal for both the fish and invertebrate species. The results of the invertebrate model followed the same positive trend as species enumerations from the river basin. ?? 2007 Elsevier B.V. All rights reserved.

  5. Use of Fatty Acid Analysis to Determine Dispersal of Caspian Terns in the Columbia River Basin, U.S.A.

    USGS Publications Warehouse

    Maranto, C.J.; Parrish, J.K.; Herman, D.P.; Punt, A.E.; Olden, J.D.; Brett, M.T.; Roby, D.D.

    2011-01-01

    Lethal control, which has been used to reduce local abundances of animals in conflict with humans or with endangered species, may not achieve management goals if animal movement is not considered. In populations with emigration and immigration, lethal control may induce compensatory immigration, if the source of attraction remains unchanged. Within the Columbia River Basin (Washington, U.S.A.), avian predators forage at dams because dams tend to reduce rates of emigration of juvenile salmonids (Oncorhynchus spp.), artificially concentrating these prey. We used differences in fatty acid profiles between Caspian Terns (Hydroprogne caspia) at coastal and inland breeding colonies and terns culled by a lethal control program at a mid-Columbia River dam to infer dispersal patterns. We modeled the rate of loss of fatty acid biomarkers, which are fatty acids that can be traced to a single prey species or groups of species, to infer whether and when terns foraging at dams had emigrated from the coast. Nonmetric multidimensional scaling showed that coastal terns had high levels of C20 and C22 monounsaturated fatty acids, whereas fatty acids of inland breeders were high in C18:3n3, C20:4n6, and C22:5n3. Models of the rate of loss of fatty acid showed that approximately 60% of the terns collected at Rock Island Dam were unlikely to have bred successfully at local (inland) sites, suggesting that terns foraging at dams come from an extensive area. Fatty acid biomarkers may provide accurate information about patterns of dispersal in animal populations and may be extremely valuable in cases where populations differ demonstrably in prey base. ??2011 Society for Conservation Biology.

  6. Use of fatty acid analysis to determine dispersal of caspian terns in the Columbia River Basin, USA.

    PubMed

    Maranto, Christina J; Parrish, Julia K; Herman, David P; Punt, André E; Olden, Julian D; Brett, Michael T; Roby, Daniel D

    2011-08-01

    Lethal control, which has been used to reduce local abundances of animals in conflict with humans or with endangered species, may not achieve management goals if animal movement is not considered. In populations with emigration and immigration, lethal control may induce compensatory immigration, if the source of attraction remains unchanged. Within the Columbia River Basin (Washington, U.S.A.), avian predators forage at dams because dams tend to reduce rates of emigration of juvenile salmonids (Oncorhynchus spp.), artificially concentrating these prey. We used differences in fatty acid profiles between Caspian Terns (Hydroprogne caspia) at coastal and inland breeding colonies and terns culled by a lethal control program at a mid-Columbia River dam to infer dispersal patterns. We modeled the rate of loss of fatty acid biomarkers, which are fatty acids that can be traced to a single prey species or groups of species, to infer whether and when terns foraging at dams had emigrated from the coast. Nonmetric multidimensional scaling showed that coastal terns had high levels of C(20) and C(22) monounsaturated fatty acids, whereas fatty acids of inland breeders were high in C18:3n3, C20:4n6, and C22:5n3. Models of the rate of loss of fatty acid showed that approximately 60% of the terns collected at Rock Island Dam were unlikely to have bred successfully at local (inland) sites, suggesting that terns foraging at dams come from an extensive area. Fatty acid biomarkers may provide accurate information about patterns of dispersal in animal populations and may be extremely valuable in cases where populations differ demonstrably in prey base. © 2011 Society for Conservation Biology.

  7. Analysis of the typical small watershed of warping dams in the sand properties

    NASA Astrophysics Data System (ADS)

    Li, Li; Yang, Ji Shan; Sun, Wei Ying; Shen, Sha Sha

    2018-06-01

    Coarse sediment with a particle size greater than 0.05mm is the main deposit of riverbed in the lower Yellow River, the Loess Plateau is one of the concentrated source of coarse sediment, warping dam is one of the important engineering measures for gully control. Jiuyuangou basin is a typical small basin in the first sub region of hilly-gullied loess region, twenty warping dams in Jiuyuangou basin was selected as research object, samples of sediment along the main line of dam from upper, middle to lower reaches of dam fields and samples of undisturbed soil in slope of dam control basin were taken to carry out particle gradation analysis, in the hope of clearing reducing capacity on coarse sediment of different types of warping dam through the experimental data. The results show that the undisturbed soil in slope of dam control basin has characteristics of standard loess, the particle size are mainly distributed in 0.025 0.05mm, and the 0.05mm particle size of Jiuyuangou basinof loess is an obvious boundary; Particle size of sediment in 15 warping dam of Jiuyuangou basin are mainly distributed in 0.031 0.05mm with the dam tail is greater than dam front in general. The separation effect of horizontal pipe drainage is better than shaft drainage for which particle size greater than 0.05mm, notch dam is for particle size between 0.025 0.1 mm, and fill dam is for particle size between 0.016 0.1 mm, they all have a certain function in the sediment sorting.

  8. Global sensitivity analysis of water age and temperature for informing salmonid disease management

    NASA Astrophysics Data System (ADS)

    Javaheri, Amir; Babbar-Sebens, Meghna; Alexander, Julie; Bartholomew, Jerri; Hallett, Sascha

    2018-06-01

    Many rivers in the Pacific Northwest region of North America are anthropogenically manipulated via dam operations, leading to system-wide impacts on hydrodynamic conditions and aquatic communities. Understanding how dam operations alter abiotic and biotic variables is important for designing management actions. For example, in the Klamath River, dam outflows could be manipulated to alter water age and temperature to reduce risk of parasite infections in salmon by diluting or altering viability of parasite spores. However, sensitivity of water age and temperature to the riverine conditions such as bathymetry can affect outcomes from dam operations. To examine this issue in detail, we conducted a global sensitivity analysis of water age and temperature to a comprehensive set of hydraulics and meteorological parameters in the Klamath River, California, where management of salmonid disease is a high priority. We applied an analysis technique, which combined Latin-hypercube and one-at-a-time sampling methods, and included simulation runs with the hydrodynamic numerical model of the Lower Klamath. We found that flow rate and bottom roughness were the two most important parameters that influence water age. Water temperature was more sensitive to inflow temperature, air temperature, solar radiation, wind speed, flow rate, and wet bulb temperature respectively. Our results are relevant for managers because they provide a framework for predicting how water within 'high infection risk' sections of the river will respond to dam water (low infection risk) input. Moreover, these data will be useful for prioritizing the use of water age (dilution) versus temperature (spore viability) under certain contexts when considering flow manipulation as a method to reduce risk of infection and disease in Klamath River salmon.

  9. The Impact of the Dachaoshan Dam on Seasonal Hydrological Dynamics in the Main Stream of the Mekong River

    NASA Astrophysics Data System (ADS)

    Kameyama, S.; Shimazaki, H.; Nohara, S.; Fukushima, M.; Kudo, K.; Sato, T.

    2008-12-01

    In the Mekong River watershed, traditional social and industrial systems have long existed in harmony with water and biological resources. Since the 1950s, many dam-construction projects have been started to develop power and water resources to meet increasing demand for energy and food production. Since the 1970s, there have been temporary interruptions to these projects because of civil war or regional volatility of international relations. Many of these projects have been restarted in the last 15 years. This raises international interest, as there are transboundary issues cross-border issues related to both development assistance and environmental conservation. By 2008, two Chinese dams had already been completed (the Manwan dam in 1996 and the Dachaoshan dam in 2003) on the Mekong River in Yunnan province. Dam construction has some positive impacts, such as electricity production, management of water resources, and flood control. However, upstream control of water discharge can have negative impacts on traditional agricultural systems and fisheries downstream from the dams, such as drastic changes in flow volume and sediment load. We used hydrological simulation of the watershed to quantify the impact of the construction of the Dachaoshan dam by comparing annual water discharge and sediment transport before and after the dam was completed. Our main objectives were to use watershed hydrologic modeling to simulate changes to annual hydrological parameters and sediment transport, and to map spatio-temporal changes of these data before and after dam construction. Our study area covered the part of the Mekong River main channel that extends about 100 km downstream from the junction of the borders of Myanmar, Thailand, and the Lao People's Democratic Republic. We used five data validation points at 25-km intervals along this section of the river and calculated model parameters every 1 km. The years we modeled were 1990 (began dam construction) and 2006 (after dam completed). We used the MIKE-SHE and MIKE11-Enterprise (developed by DHI) to calculate seasonal changes of water level, water velocity, and sediment transport. These models provided both water discharge and sediment transport dynamics at each modeled point along the river. The sediment budget was calculated as the difference of sediment load by volume between adjacent modeled points. All parameters used in the model were calibrated with field survey data; the river structure and water flows were measured in November 2007. To validate our simulated results we used historical water-level records from the towns of Chensean and Chencone. To determine the relationship between water discharge and sediment load, we analyzed the turbidity of monthly river water samples collected in the study region between November 2007 and November 2008. Our watershed runoff models simulated water discharge and sediment load at 1-km intervals and 1-h time steps for 1990 and 2006. The model results were compiled in GIS format and maps were produced to provide simple spatial displays of modeled parameters. Our simulations show that after construction of the dam, there was a moderate decrease in peak discharge volume and water velocity during the rainy season from August to September.

  10. Hydrologic and hydraulic factors affecting passage of paddlefish through dams in the Upper Mississippi River

    USGS Publications Warehouse

    Zigler, S.J.; Dewey, M.R.; Knights, B.C.; Runstrom, A.L.; Steingraeber, M.T.

    2004-01-01

    Populations of paddlefish Polyodon spathula have been adversely affected by dams that can block their movements. Unlike high-head dams that preclude fish passage (unless they are equipped with fishways), the dams on the upper Mississippi River are typically low-head dams with bottom release gates that may allow fish passage under certain conditions. We evaluated the relation of dam head and river discharge to the passage of radio-tagged paddlefish through dams in the upper Mississippi River. Radio transmitters were surgically implanted into 71 paddlefish from Navigation Pools 5A and 8 of the upper Mississippi River and from two tributary rivers during fall 1994 through fall 1996. We tracked paddlefish through September 1997 and documented 53 passages through dams, 20 upstream and 33 downstream. Passages occurred mostly during spring (71%) but also occurred sporadically during summer and fall (29%). Spring passages varied among years in response to hydrologic conditions. We evaluated patterns in upstream and downstream passages with Cox proportional hazard regression models. Model results indicated that dam head height strongly affected the upstream passage of paddlefish but not the downstream passage. Several paddlefish, however, passed upstream through a dam during periods when the minimum head at the dam was substantial ( greater than or equal to 1m). In these cases, we hypothesize that paddlefish moved upstream through the lock chamber.

  11. Transport, dam passage, and size selection of adult Atlantic Salmon in the Penobscot River, Maine

    USGS Publications Warehouse

    Sigourney, Douglas B.; Zydlewski, Joseph D.; Hughes, Edward; Cox, Oliver

    2015-01-01

    Prior to 2012, returning adult Atlantic Salmon Salmo salar had to pass through fishways at three dams in the lower section of the Penobscot River, Maine: Veazie Dam (river kilometer [rkm] 48; removed in 2013), Great Works Dam (rkm 60; removed in 2012), and Milford Dam (rkm 62). To facilitate better passage through the lower river, a fish transport program was implemented in 2010 and 2011. Fish were captured at Veazie Dam and were either transported by truck above Milford Dam (TRKD group) or released into the head pond above Veazie Dam (run-of-the-river [ROR] group). To assess the efficacy of transport, we used PIT telemetry to compare the performance and passage of TRKD and ROR fish based on their (1) success in reaching one of the three dams upstream of Milford Dam, (2) time taken to reach an upstream dam (transit time), and (3) success in passing that upstream dam. In both years, the percentage of fish detected at upstream dams was higher for the TRKD group (82.4% in 2010; 78.6% in 2011) than for the ROR group (41.3% in 2010; 22.4% in 2011). In addition, median transit time was faster for TRKD fish (7 d in 2010; 5 d in 2011) than for ROR fish (23 d in 2010; 25 d in 2011). However, passage success through the upstream dams did not differ between the two release groups. Our analysis also revealed a strong, negative size-selective force on dam passage: larger fish were consistently less likely to successfully pass dams than smaller fish. Finally, environmental conditions also influenced passage success. Our analysis shows that the transport of adult Atlantic Salmon can be an effective means by which to increase migration success in systems where upstream passage is poor.

  12. Computational hydraulics of a cascade of experimental-scale landside dam failures

    NASA Astrophysics Data System (ADS)

    Wright, N.; Guan, M.

    2015-12-01

    Abstract: Landslide dams typically comprise unconsolidated and poorly sorted material, and are vulnerable to rapid failure and breaching, particularly in mountainous areas during high intense rainfalls. A large flash flood with high-concentrated sediment can be formed in a short period, and the magnitude is likely to be amplified along the flow direction due to the inclusion of a large amount of sediment. This can result in significant and sudden flood risk downstream for human life and property. Numerous field evidence has indicated the various risks of landslide dam failures. In general, cascading landslide dams can be formed along the sloping channel due to the randomness and unpredictability of landslides, which complexes the hydraulics of landslide dam failures. The failure process of a single dam and subsequent floods has attracted attention in multidisciplinary studies. However, the dynamic failure process of cascading landslide dams has been poorly understood. From a viewpoint of simulation, this study evaluates the formation and development of rapid sediment-charged floods due to cascading failure of landslide dams through detailed hydro-morphodynamic modelling. The model used is based on shallow water theory and it has been successful in predicting the flow and morphological process during sudden dam-break, as well as full and partial dyke-breach. Various experimental-scale scenarios are modelled, including: (1) failure of a single full dam in a sloping channel, (2) failure of two dams in a sloping channel, (3) failure of multiple landslide dams (four) in a sloping channel. For each scenario, different failure modes (sudden/gradual) and bed boundary (fixed /mobile) are assumed and simulated. The study systematically explores the tempo-spatial evolution of landslide-induced floods (discharge, flow velocity, and flow concentration) and geomorphic properties along the sloping channel. The effects of in-channel erosion and flow-driven sediment from dams on the development of flood process are investigated. The results improve the understanding of the formation and development mechanism of flash floods due to cascading landslide dam failures. The findings are beneficial for downstream flood risk assessment and developing control strategies for landslide-induced floods.

  13. Evaluating the Impact of Gilgel Gibe Dam on the Lake Turkana Water Levels: An Illustration from an Endorheic Lake in Africa

    NASA Astrophysics Data System (ADS)

    Velpuri, N.; Senay, G. B.

    2010-12-01

    Lake Turkana is one of the lakes in the Great Rift Valley, Africa. This lake has no outlet hence it is considered as closed or endorheic lake. To meet the demand of electricity in the east African region, Ethiopia is currently building Gilgel Gibe-III dam on the Omo River, which supplies up to 80% of the inflows to the Lake Turkana. On completion, this dam would be the tallest dam in Africa with a height of 241 m. As Lake Turkana is highly dependent on the inflows from the Omo River, the construction of this dam could potentially pose a threat to the downstream river valley and to Lake Turkana. This hydroelectric project is arguably one of the most controversial projects in the region. The impact of the dam on the lake is evaluated using Remote Sensing datasets and hydrologic modeling. First, lake water levels (1998-2007) were estimated using the Simplified Lake Water Balance (SLAB) approach which takes in satellite based rainfall estimates, modeled runoff and evapotranspiration data over the Turkana basin. Modeled lake levels were validated against TOPEX/POSIEDON/Jason-1 satellite altimeter data. Validation results showed that the model could capture observed trends and seasonal variations in lake levels. The fact that the lake is endorheic makes it easy to model the lake levels. Using satellite based estimates for the years 1998-2009, future scenarios for rainfall and evapotranspiration were generated using the Monte Carlo simulation approach and the impact of Gilgel Gibe-III dam on the Lake Turkana water levels is evaluated using SLAB approach. Preliminary results indicate that the impact of the dam on the lake would vary with the initial water level in the lake at the time of dam commissioning. It was found that during the initial period of dam/reservoir filling the lake level would drop up to 2-3 m (95% confidence interval). However, on average the lake would stabilize within 10 years from the date of commissioning. The variability within the lake levels due to reduced inflows after the dam commissioning were found to be within the natural variability of the lake (0-5 m). The use of cost free satellite based estimates for runoff and evapotranspiration modeling makes this approach consistent and credible. It is also easy to replicate on any other dam in the world. Results obtained from this approach are very valuable and would aid decision makers and environmentalists in proper decision making.

  14. Analysis of the hydrological safety of dams combining two numerical tools: Iber and DualSPHysics

    NASA Astrophysics Data System (ADS)

    González-Cao, J.; García-Feal, O.; Domínguez, J. M.; Crespo, A. J. C.; Gómez-Gesteira, M.

    2018-02-01

    The upgrade of the hydrological safety of dams is a critical issue to avoid failures that can dramatically affect people and assets. This paper shows a numerical methodology to analyse the safety of the Belesar dam (NW, Spain) based on two different numerical codes. First, a mesh-based code named Iber, suited to deal with large 2-D domains, is used to simulate the impoundment. The initial conditions and the inlet provided to Iber correspond to the maximum water elevation and the maximum expected inflow to the impoundment defined in the technical specifications of the dam, which are associated to the more hazardous operation conditions of the dam. Iber provides information about the time needed for water to attain the crest of the dam when floodgates are closed. In addition, it also provides the velocity of discharge when gates are opened. Then, a mesh-free code named DualSPHysics, which is especially suited to deal with complex and violent 3-D flows, is used to reproduce the behaviour of one of the spillways of the dam starting from the results obtained with Iber, which are used as inlet conditions for DualSPHysics. The combined results of both model show that the left spillway can discharge the surplus of water associated to the maximum inflow to the reservoir if the gates of the spillways are opened before the overtopping of the dam was observed. In addition, water depth measured on the spillway is considerably lower than the lateral walls, preventing overtopping. Finally, velocities at different points of the spillway showed to be in good agreement with theoretical values.

  15. Dormancy-associated MADS-box genes and microRNAs jointly control dormancy transition in pear (Pyrus pyrifolia white pear group) flower bud

    PubMed Central

    Niu, Qingfeng; Li, Jianzhao; Cai, Danying; Qian, Minjie; Jia, Huimin; Bai, Songling; Hussain, Sayed; Liu, Guoqin; Teng, Yuanwen; Zheng, Xiaoyan

    2016-01-01

    Bud dormancy in perennial plants is indispensable to survival over winter and to regrowth and development in the following year. However, the molecular pathways of endo-dormancy induction, maintenance, and release are still unclear, especially in fruit crops. To identify genes with roles in regulating endo-dormancy, 30 MIKCC-type MADS-box genes were identified in the pear genome and characterized. The 30 genes were analysed to determine their phylogenetic relationships with homologous genes, genome locations, gene structure, tissue-specific transcript profiles, and transcriptional patterns during flower bud dormancy in ‘Suli’ pear (Pyrus pyrifolia white pear group). The roles in regulating bud dormancy varied among the MIKC gene family members. Yeast one-hybrid and transient assays showed that PpCBF enhanced PpDAM1 and PpDAM3 transcriptional activity during the induction of dormancy, probably by binding to the C-repeat/DRE binding site, while DAM proteins inhibited the transcriptional activity of PpFT2 during dormancy release. In the small RNA-seq analysis, 185 conserved, 24 less-conserved, and 32 pear-specific miRNAs with distinct expression patterns during bud dormancy were identified. Joint analyses of miRNAs and MIKC genes together with degradome data showed that miR6390 targeted PpDAM transcripts and degraded them to release PpFT2. Our data show that cross-talk among PpCBF, PpDAM, PpFT2, and miR6390 played important roles in regulating endo-dormancy. A model for the molecular mechanism of dormancy transition is proposed: short-term chilling in autumn activates the accumulation of CBF, which directly promotes DAM expression; DAM subsequently inhibits FT expression to induce endo-dormancy, and miR6390 degrades DAM genes to release endo-dormancy. PMID:26466664

  16. Stress and deformation analysis of double curvature arc dams using finite element method (FEM): A case of budhi gandaki hydropower project

    NASA Astrophysics Data System (ADS)

    Mishra, Aanand Kumar; Singh, Ajay; Bahadur Singh, Akal

    2018-06-01

    High rise arc dams are widely used in the development of storage type hydropower project because of the economic advantage. Among different phases considered during the lifetime of dam, control of dam’s safety and performance becomes more concerned during the lifetime. This paper proposed the 3 – D finite element method (FEM) for stress and deformation analysis of double curvature arc dam considering the non – linearity of foundation rock following the Hoek – Brown Criterion. The proposed methodology is implemented through MATLAB scripting language and studied the double curvature arc dam proposed for Budhi Gandaki hydropower project. The stress developed in the foundation rock, compressive and tensile stress acting on the dam are investigated and analysed for the reservoir level variation. Deformation at the top of the dam and in the foundation rock is also investigated. In addition to that, stress and deformation variation in the foundation rock is analysed for various rock properties.

  17. Formulation of an Integrated Community Based Disaster Management for Hydroelectric facilities: The Malaysia Case

    NASA Astrophysics Data System (ADS)

    Hijazzi, Norshamirra; Thiruchelvam, Sivadass; Sabri Muda, Rahsidi; Nasharuddin Mustapha, Kamal; Che Muda, Zakaria; Ghazali, Azrul; Kamal Kadir, Ahmad; Hakimie, Hazlinda; Sahari, Khairul Salleh Mohamed; Hasini, Hasril; Mohd Sidek, Lariyah; Itam, Zarina; Fadhli Mohamad, Mohd; Razad, Azwin Zailti Abdul

    2016-03-01

    Dams, however significant their contributions are to the society, are not immune to failures and diminishing lifespan not unlike other structural elements in our infrastructure. Despite continuing efforts on design, construction, operation, and maintenance of dams to improve the safety of the dams, the possibility of unforeseen events of dam failures is still possible. Seeing that dams are usually integrated into close approximities with the community, dam failures may consequent in tremendous loss of lives and properties. The aims of formulation of Integrated Community Based Disaster Management (ICBDM) is to simulate evacuation modelling and emergency planning in order to minimize loss of life and property damages in the event of a dam-related disaster. To achieve the aim above, five main pillars have been identified for the formulation of ICBDM. A series of well-defined program inclusive of hydrological 2-D modelling, life safety modelling, community based EWS and CBTAP will be conducted. Finally, multiple parties’ engagement is to be carried out in the form of table top exercise to measure the readiness of emergency plans and response capabilities of key players during the state of a crisis.

  18. Simulation of Grouting Process in Rock Masses Under a Dam Foundation Characterized by a 3D Fracture Network

    NASA Astrophysics Data System (ADS)

    Deng, Shaohui; Wang, Xiaoling; Yu, Jia; Zhang, Yichi; Liu, Zhen; Zhu, Yushan

    2018-06-01

    Grouting plays a crucial role in dam safety. Due to the concealment of grouting activities, complexity of fracture distribution in rock masses and rheological properties of cement grout, it is difficult to analyze the effects of grouting. In this paper, a computational fluid dynamics (CFD) simulation approach of dam foundation grouting based on a 3D fracture network model is proposed. In this approach, the 3D fracture network model, which is based on an improved bootstrap sampling method and established by VisualGeo software, can provide a reliable and accurate geometric model for CFD simulation of dam foundation grouting. Based on the model, a CFD simulation is performed, in which the Papanastasiou regularized model is used to express the grout rheological properties, and the volume of fluid technique is utilized to capture the grout fronts. Two sets of tests are performed to verify the effectiveness of the Papanastasiou regularized model. When applying the CFD simulation approach for dam foundation grouting, three technical issues can be solved: (1) collapsing potential of the fracture samples, (2) inconsistencies in the geometric model in actual fractures under complex geological conditions, and (3) inappropriate method of characterizing the rheological properties of cement grout. The applicability of the proposed approach is demonstrated by an illustrative case study—a hydropower station dam foundation in southwestern China.

  19. Migratory delay leads to reduced passage success of Atlantic salmon smolts at a hydroelectric dam

    USGS Publications Warehouse

    Nyqvist, Daniel; Greenberg, L.; Goerig, E.; Calles, O.; Bergman, E.; Ardren, William R.; Castro-Santos, Theodore R.

    2017-01-01

    Passage of fish through hydropower dams is associated with mortality, delay, increased energy expenditure and migratory failure for migrating fish and the need for remedial measures for both upstream and downstream migration is widely recognised. A functional fish passage must ensure safe and timely passage routes that a substantial portion of migrating fish will use. Passage solutions must address not only the number or percentage of fish that successfully pass a barrier, but also the time it takes to pass. Here, we used radiotelemetry to study the functionality of a fish bypass for downstream-migrating wild-caught and hatchery-released Atlantic salmon smolts. We used time-to-event analysis to model the influence of fish characteristics and environmental variables on the rates of a series of events associated with dam passage. Among the modelled events were approach rate to the bypass entry zone, retention rates in both the forebay and the entry zone and passage rates. Despite repeated attempts, only 65% of the tagged fish present in the forebay passed the dam. Fish passed via the bypass (33%), via spill (18%) and via turbines (15%). Discharge was positively related to approach, passage and retention rates. We did not detect any differences between wild and hatchery fish. Even though individual fish visited the forebay and the entry zone on multiple occasions, most fish passed during the first exposures to these zones. This study underscores the importance of timeliness to passage success and the usefulness of time-to-event analysis for understanding factors governing passage performance.

  20. Guidelines for Calculating and Routing a Dam-Break Flood.

    DTIC Science & Technology

    1977-01-01

    flow, Teton Dam . 20. ABSTRACT (Continue an reverse aide If necessary and Identify by block number) This report described procedures necessary to calculate...and route a dam -break flood using an existing generalized unsteady open channel flow model. The recent Teton Dam event was reconstituted to test the...methodology may be obtained from The Hydrologic Engineering Center. The computer program was applied to the Teton Dam data set to demonstrate the level of

  1. An Integrated Approach for Physical and Cyber Security Risk Assessment: The U.S. Army Corps of Engineers Common Risk Model for Dams

    DTIC Science & Technology

    2016-07-01

    Common Risk Model for Dams ( CRM -D) Methodology,” for the Director, Cost Assessment and Program Evaluation, Office of Secretary of Defense and the...for Dams ( CRM -D), developed by the U.S. Army Corps of Engineers (USACE) in collaboration with the Institute for Defense Analyses (IDA) and the U.S...and cyber security risks across a portfolio of dams, and informing decisions on how to mitigate those risks. The CRM -D can effectively quantify the

  2. Calibration and validation of a two-dimensional hydrodynamic model of the Ohio River, Jefferson County, Kentucky

    USGS Publications Warehouse

    Wagner, C.R.; Mueller, D.S.

    2001-01-01

    The quantification of current patterns is an essential component of a Water Quality Analysis Simulation Program (WASP) application in a riverine environment. The U.S. Geological Survey (USGS) provided a field validated two-dimensional Resource Management Associates-2 (RMA-2) hydrodynamic model capable of quantifying the steady-flowpatterns in the Ohio River extending from river mile 590 to 630 for the Ohio River Valley Water Sanitation Commission (ORSANCO) water-quality modeling efforts on that reach. Because of the hydrodynamic complexities induced by McAlpine Locks and Dam (Ohio River mile 607), the model was split into two segments: an upstream reach, which extended from the dam upstream to the upper terminus of the study reach at Ohio River mile 590; and a downstream reach, which extended from the dam downstream to a lower terminus at Ohio River mile 636. The model was calibrated to a low-flow hydraulic survey (approximately 35,000 cubic feet per second (ft3/s)) and verified with data collected during a high-flow survey (approximately 390,000 ft3/s). The model calibration and validation process included matching water-surface elevations at 10 locations and velocity profiles at 30 cross sections throughout the study reach. Based on the calibration and validation results, the model is a representative simulation of the Ohio River steady-flow patterns below discharges of approximately 400,000 ft3/s.

  3. Deformation Monitoring and Bathymetry Analyses in Rock-Fill Dams, a Case Study at Ataturk Dam

    NASA Astrophysics Data System (ADS)

    Kalkan, Y.; Bilgi, S.

    2014-12-01

    Turkey has 595 dams constructed between 1936 and 2013 for the purposes of irrigation, flood control, hydroelectric energy and drinking water. A major portion of the dam basins in Turkey are deprived of vegetation and have slope topography on near surrounding area. However, landscaping covered with forest around the dam basin is desirable for erosion control. In fact; the dams, have basins deprived of vegetation, fill up quickly due to sediment transport. Erosion control and forestation are important factors, reducing the sediment, to protect the water basins of the dams and increase the functioning life of the dams. The functioning life of dams is as important as the investment and construction. Nevertheless, in order to provide safety of human life living around, well planned monitoring is essential for dams. Dams are very large and critical structures and they demand the use or application of precise measuring systems. Some basic physical data are very important for assessing the safety and performance of dams. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. Monitoring is an essential component of the dam after construction and during operation and must en­able the timely detection of any behavior that could deteriorate the dam, potentially result in its shutdown or failure. Considering the time and labor consumed by long-term measurements, processing and analysis of measured data, importance of the small structural motions at regular intervals could be comprehended. This study provides some information, safety and the techniques about the deformation monitoring of the dams, dam safety and related analysis. The case study is the deformation measurements of Atatürk Dam in Turkey which is the 6th largest dam of world considering the filling volume of embankment. Brief information is given about the dam and the methods of monitoring techniques applied by various disciplines. Some results have been obtained from this method for nearly eight years are presented in this work. In addition, the results of bathymetric surveys between 2005 and 2010 will be compared using the cross sections where the maximum changes occurred on the dam bottom of the reservoir area.

  4. Full implementation of a distributed hydrological model based on check dam trapped sediment volumes

    NASA Astrophysics Data System (ADS)

    Bussi, Gianbattista; Francés, Félix

    2014-05-01

    Lack of hydrometeorological data is one of the most compelling limitations to the implementation of distributed environmental models. Mediterranean catchments, in particular, are characterised by high spatial variability of meteorological phenomena and soil characteristics, which may prevents from transferring model calibrations from a fully gauged catchment to a totally o partially ungauged one. For this reason, new sources of data are required in order to extend the use of distributed models to non-monitored or low-monitored areas. An important source of information regarding the hydrological and sediment cycle is represented by sediment deposits accumulated at the bottom of reservoirs. Since the 60s, reservoir sedimentation volumes were used as proxy data for the estimation of inter-annual total sediment yield rates, or, in more recent years, as a reference measure of the sediment transport for sediment model calibration and validation. Nevertheless, the possibility of using such data for constraining the calibration of a hydrological model has not been exhaustively investigated so far. In this study, the use of nine check dam reservoir sedimentation volumes for hydrological and sedimentological model calibration and spatio-temporal validation was examined. Check dams are common structures in Mediterranean areas, and are a potential source of spatially distributed information regarding both hydrological and sediment cycle. In this case-study, the TETIS hydrological and sediment model was implemented in a medium-size Mediterranean catchment (Rambla del Poyo, Spain) by taking advantage of sediment deposits accumulated behind the check dams located in the catchment headwaters. Reservoir trap efficiency was taken into account by coupling the TETIS model with a pond trap efficiency model. The model was calibrated by adjusting some of its parameters in order to reproduce the total sediment volume accumulated behind a check dam. Then, the model was spatially validated by obtaining the simulated sedimentation volume at the other eight check dams and comparing it to the observed sedimentation volumes. Lastly, the simulated water discharge at the catchment outlet was compared with observed water discharge records in order to check the hydrological sub-model behaviour. Model results provided highly valuable information concerning the spatial distribution of soil erosion and sediment transport. Spatial validation of the sediment sub-model provided very good results at seven check dams out of nine. This study shows that check dams can be a useful tool also for constraining hydrological model calibration, as model results agree with water discharge observations. In fact, the hydrological model validation at a downstream water flow gauge obtained a Nash-Sutcliffe efficiency of 0.8. This technique is applicable to all catchments with presence of check dams, and only requires rainfall and temperature data and soil characteristics maps.

  5. Putting Roman Dams in Context: a Virtual Approach

    NASA Astrophysics Data System (ADS)

    Decker, M. J.; Du Vernay, J. P.; Mcleod, J. B.

    2017-08-01

    Water resources and management have become a critical global issue. During the half-millennium of its existence, the Roman Empire developed numerous strategies to cope with water management, from large-scale urban aqueduct systems, to industrial-scale water mills designed to cope with feeding growing city populations. Roman engineers encountered, adopted, and adapted indigenous hydraulic systems, and left lasting imprints on the landscape of the Mediterranean and temperate Western Europe by employing a range of water technologies. A recent academic study has enabled the identification of remains of and references to seventy-two dams from the Roman era, constructed in Spain between the 1st and 4th century AD. Such unique heritage, without comparisons in the Mediterranean makes Spain an emblematic case study for the analysis of Roman hydraulic engineering and water management policies. Fifty dams have been located and detailed. The twenty-two outstanding, although identified on the ground, have not been able to be acceptably characterized, due in some cases to their being ruins in a highly degraded state, others due to their being masked by repairs and reconstructions subsequent to the Roman era. A good example of such neglected dams is the buttress dam of Consuegra , in Toledo province (Castilla-La Mancha). Dating to the 3rd - 4th century AD, the Dam of Consuegra, on the basin of the Guadiana, with its over 600 metres length and 4,80 metres height, is a remarkable case of Roman engineering mastery. It had a retaining wall upstream, numerous buttresses and perhaps an embankment downstream, of which no remains are left. The application of 3D digital imaging technique to create a high quality virtual model of such monuments has proved to be successful especially for the study of the technological aspects related its construction. The case study of the Roman dam of Muel (Zaragoza) has shown, in fact, as best practices in digital archaeology can provide an original and innovative perspective on a long time studied monument. In this paper it will be explored how deploying recent computer technologies to the Roman dam at Consuegra can advance our understanding of the history of local and regional landscape change and the technology of water management. In summer 2016, the dam has been documented with terrestrial laser scanning with two FARO Focus 3D x330 and aerial photogrammetry image capturing with a DJI Phantom 4 drone. Data was processed in various 3D software applications to generate 3D representations of the dam including 3D point clouds, animations, and meshed models.

  6. The potential for dams to impact lowland meandering river floodplain geomorphology.

    PubMed

    Marren, Philip M; Grove, James R; Webb, J Angus; Stewardson, Michael J

    2014-01-01

    The majority of the world's floodplains are dammed. Although some implications of dams for riverine ecology and for river channel morphology are well understood, there is less research on the impacts of dams on floodplain geomorphology. We review studies from dammed and undammed rivers and include influences on vertical and lateral accretion, meander migration and cutoff formation, avulsion, and interactions with floodplain vegetation. The results are synthesized into a conceptual model of the effects of dams on the major geomorphic influences on floodplain development. This model is used to assess the likely consequences of eight dam and flow regulation scenarios for floodplain geomorphology. Sediment starvation downstream of dams has perhaps the greatest potential to impact on floodplain development. Such effects will persist further downstream where tributary sediment inputs are relatively low and there is minimal buffering by alluvial sediment stores. We can identify several ways in which floodplains might potentially be affected by dams, with varying degrees of confidence, including a distinction between passive impacts (floodplain disconnection) and active impacts (changes in geomorphological processes and functioning). These active processes are likely to have more serious implications for floodplain function and emphasize both the need for future research and the need for an "environmental sediment regime" to operate alongside environmental flows.

  7. The Potential for Dams to Impact Lowland Meandering River Floodplain Geomorphology

    PubMed Central

    Marren, Philip M.; Grove, James R.; Webb, J. Angus; Stewardson, Michael J.

    2014-01-01

    The majority of the world's floodplains are dammed. Although some implications of dams for riverine ecology and for river channel morphology are well understood, there is less research on the impacts of dams on floodplain geomorphology. We review studies from dammed and undammed rivers and include influences on vertical and lateral accretion, meander migration and cutoff formation, avulsion, and interactions with floodplain vegetation. The results are synthesized into a conceptual model of the effects of dams on the major geomorphic influences on floodplain development. This model is used to assess the likely consequences of eight dam and flow regulation scenarios for floodplain geomorphology. Sediment starvation downstream of dams has perhaps the greatest potential to impact on floodplain development. Such effects will persist further downstream where tributary sediment inputs are relatively low and there is minimal buffering by alluvial sediment stores. We can identify several ways in which floodplains might potentially be affected by dams, with varying degrees of confidence, including a distinction between passive impacts (floodplain disconnection) and active impacts (changes in geomorphological processes and functioning). These active processes are likely to have more serious implications for floodplain function and emphasize both the need for future research and the need for an “environmental sediment regime” to operate alongside environmental flows. PMID:24587718

  8. Assessment of environmental impacts part one. Intervention analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hipel, Keith William; Lettenmaier, Dennis P.; McLeod, A. Ian

    The use of intervention analysis as a statistical method of gauging the effects of environmental changes is discussed. The Box-Jenkins model, serves as the basis for the intervention analysis methodology. Environmental studies of the Aswan Dam, the South Saskatchewan River, and a forest fire near the Pipers Hole River, Canada, are included as case studies in which intervention analysis was employed. Methods of data collection for intervention analysis are found to have a significant impact on model reliability; effective data collection processes for the Box-Jenkins model are provided. (15 graphs, 27 references, 2 tables)

  9. National Program for Inspection of Non-Federal Dams. Baker Floodwater Reservoir Site 11 (NH 00478), NHWRB No. 249.13, Merrimack River Basin, Wentworth, New Hampshire. Phase I Inspection Report.

    DTIC Science & Technology

    1979-07-01

    General 5-1 b. Design Data 5-1 c. Experience Data 5-1 d. Visual Observation 5-1 e. Overtopping Potential 5-1 f. Dam Failure Analysis 5-2 6. STRUCTURAL...the Soil Conservation Service, Durham, New Hampshire. The construction * contractor was Robie Construction Company , Inc. i. Normal Operating...INVENTORY OF DAMS P 0O - ... - SECTION 5 HYDROLOGY AND HYDRAULIC ANALYSIS • 5.1 Evaluation of Features a. General. Baker Dam Site 11 is an earthen

  10. A physically-based method for predicting peak discharge of floods caused by failure of natural and constructed earthen dams

    USGS Publications Warehouse

    Walder, J.S.; O'Connor, J. E.; Costa, J.E.; ,

    1997-01-01

    We analyse a simple, physically-based model of breach formation in natural and constructed earthen dams to elucidate the principal factors controlling the flood hydrograph at the breach. Formation of the breach, which is assumed trapezoidal in cross-section, is parameterized by the mean rate of downcutting, k, the value of which is constrained by observations. A dimensionless formulation of the model leads to the prediction that the breach hydrograph depends upon lake shape, the ratio r of breach width to depth, the side slope ?? of the breach, and the parameter ?? = (V.D3)(k/???gD), where V = lake volume, D = lake depth, and g is the acceleration due to gravity. Calculations show that peak discharge Qp depends weakly on lake shape r and ??, but strongly on ??, which is the product of a dimensionless lake volume and a dimensionless erosion rate. Qp(??) takes asymptotically distinct forms depending on whether < ??? 1 or < ??? 1. Theoretical predictions agree well with data from dam failures for which k could be reasonably estimated. The analysis provides a rapid and in many cases graphical way to estimate plausible values of Qp at the breach.We analyze a simple, physically-based model of breach formation in natural and constructed earthen dams to elucidate the principal factors controlling the flood hydrograph at the breach. Formation of the breach, which is assumed trapezoidal in cross-section, is parameterized by the mean rate of downcutting, k, the value of which is constrained by observations. A dimensionless formulation of the model leads to the prediction that the breach hydrograph depends upon lake shape, the ratio r of breach width to depth, the side slope ?? of the breach, and the parameter ?? = (V/D3)(k/???gD), where V = lake volume, D = lake depth, and g is the acceleration due to gravity. Calculations show that peak discharge Qp depends weakly on lake shape r and ??, but strongly on ??, which is the product of a dimensionless lake volume and a dimensionless erosion rate. Qp(??) takes asymptotically distinct forms depending on whether ?????1 or ?????1. Theoretical predictions agree well with data from dam failures for which k could be reasonably estimated. The analysis provides a rapid and in many cases graphical way to estimate plausible values of Qp at the breach.

  11. Sedimentation and Its Impacts/Effects on River System and Reservoir Water Quality: case Study of Mazowe Catchment, Zimbabwe

    NASA Astrophysics Data System (ADS)

    Tundu, Colleta; Tumbare, Michael James; Kileshye Onema, Jean-Marie

    2018-04-01

    Sediment delivery into water sources and bodies results in the reduction of water quantity and quality, increasing costs of water purification whilst reducing the available water for various other uses. The paper gives an analysis of sedimentation in one of Zimbabwe's seven rivers, the Mazowe Catchment, and its impact on water quality. The Revised Universal Soil Loss Equation (RUSLE) model was used to compute soil lost from the catchment as a result of soil erosion. The model was used in conjunction with GIS remotely sensed data and limited ground observations. The estimated annual soil loss in the catchment indicates soil loss ranging from 0 to 65 t ha yr-1. Bathymetric survey at Chimhanda Dam showed that the capacity of the dam had reduced by 39 % as a result of sedimentation and the annual sediment deposition into Chimhanda Dam was estimated to be 330 t with a specific yield of 226 t km-2 yr-1. Relationship between selected water quality parameters, TSS, DO, NO3, pH, TDS, turbidity and sediment yield for selected water sampling points and Chimhanda Dam was analyzed. It was established that there is a strong positive relationship between the sediment yield and the water quality parameters. Sediment yield showed high positive correlation with turbidity (0.63) and TDS (0.64). Water quality data from Chimhanda treatment plant water works revealed that the quality of water is deteriorating as a result of increase in sediment accumulation in the dam. The study concluded that sedimentation can affect the water quality of water sources.

  12. Out, out, dam spot! The geomorphic response of rivers to dam removal.

    Treesearch

    Jonathan Thompson

    2005-01-01

    About 75,000 irrigation, flood control, and hydropower dams in the United States are aging, deteriorating, or have outlived their useful lives and purposes. Not surprisingly, dam removal is emerging as both a challenge and opportunity for river management and research. Scientists at the PNW Research Station in Corvallis, Oregon, are using scale models and monitoring...

  13. The remains of the dam: what have we learned from 15 years of US dam removals?

    Treesearch

    Gordon E. Grant; Sarah L. Lewis

    2015-01-01

    Important goals for studying dam removal are to learn how rivers respond to large and rapid introductions of sediment, and to develop predictive models to guide future dam removals. Achieving these goals requires organizing case histories systematically so that underlying physical mechanisms determining rates and styles of sediment erosion, transport, and deposition...

  14. Sediment impact assessment of check-dam removal strategies on a mountain river in Taiwan

    NASA Astrophysics Data System (ADS)

    Kuo, W.; Wang, H.; Stark, C. P.

    2011-12-01

    Dam removal is important for reconnecting river habitats and restoring the free flow of water and sediment, so managing accumulated sediments is crucial in dam removal planning as the cost and potential impacts of dam removal can vary substantially depending on local conditions. A key uncertainty in dam removal is the fate of reservoir sediment stored upstream of the dam. Release of impounded sediment could raise downstream bed elevations leading to flooding, increase lateral channel mobility leading to bank erosion, and potentially bury downstream ecologically sensitive habitats if the sediment is fine. The ability to predict the sediment impacts of dam removal in highly sediment-filled systems is thus increasingly important as the number of such dam-removal cases is growing. Due to the safety concerns and the need for habitat restoration for the Formosan landlocked salmon, the Shei-Pa National Park in Taiwan removed the 15m high Chijiawan "No. 1 Check Dam" in late May 2011. During the planning process prior to removal, we conducted field surveys, numerical simulations, and flume experiments to determine sediment impacts and to suggest appropriate dam removal strategies. We collected river-bed topography and sediment bulk samples in 2010 to establish the channel geometry and grain-size distribution for modeling input. The scaled flume experiment was designed to provide insights on how and if the position of a notch location and size would affect the rate and amount of reservoir erosion under particular discharges. Observations indicated that choices of notch location can force the river to migrate differently. For long-term prediction, we used the quasi-two-dimensional numerical model NETSTARS (Network of Stream Tube model for Alluvial River Simulation) to simulate the channel responses. These simulations indicated that high suspended sediment concentrations would be the most likely major concern in the first year, while concerns for downstream sediment deposition would be minor. We then compared the experimental and numerical predictions with the response of the river to the actual removal. Comparisons of river bed topography pre- and post-dam removal suggest that the predictions provided solid information but also highlight discrepancies between the model predictions and the field data that have implications for future dam-removal assessments.

  15. Harvesting river water through small dams promote positive environmental impact.

    PubMed

    Agoramoorthy, Govindasamy; Chaudhary, Sunita; Chinnasamy, Pennan; Hsu, Minna J

    2016-11-01

    While deliberations relating to negative consequences of large dams on the environment continue to dominate world attention, positive benefits provided by small dams, also known as check dams, go unobserved. Besides, little is known about the potential of check dams in mitigating global warming impacts due to less data availability. Small dams are usually commissioned to private contractors who do not have clear mandate from their employers to post their work online for public scrutiny. As a result, statistics on the design, cost, and materials used to build check dams are not available in public domain. However, this review paper presents data for the first time on the often ignored potential of check dams mitigating climate-induced hydrological threats. We hope that the scientific analysis presented in this paper will promote further research on check dams worldwide to better comprehend their eco-friendly significance serving society.

  16. Insights from analyzing and modelling cascading multi-lake outburst flood events in the Santa Cruz Valley (Cordillera Blanca, Perú)

    NASA Astrophysics Data System (ADS)

    Emmer, Adam; Mergili, Martin; Juřicová, Anna; Cochachin, Alejo; Huggel, Christian

    2016-04-01

    Since the end of Little Ice Age, the Cordillera Blanca of Perú has experienced tens of lake outburst floods (LOFs), resulting in the loss of thousands of lives and significant material damages. Most commonly involving glacial lakes, such events are often directly or indirectly related to glacier retreat. Here we analyze an event on 8th February 2012 involving four lakes and affecting two valleys (Santa Cruz and Artizón) in the northern part of the Cordillera Blanca. Using the combination of field data, satellite images, digital elevation model (DEM) and GIS-based modelling approaches, the main objectives are: (i) to better understand complex multi-lake outburst flood and related foregoing and induced geomorphological processes; and (ii) to evaluate and discuss the suitability, potentials and limitations of the r.avaflow model for modelling such complex process chains. Analyzing field geomorphological evidence and remotely-sensed images, we reconstruct the event as follows: a landslide from the recently deglaciated left lateral moraine of Lake Artizón Alto (4 639 m a.s.l.), characterized by steep slopes and a height of more than 200 m produced a displacement wave which overtopped the bedrock dam of the lake. The resulting flood wave breached the dam of the downstream moraine-/landslide-dammed Lake Artizón Bajo (4 477 m a.s.l.), decreasing the lake level by 10 m and releasing 3 x 105 m3 of water. Significant amounts of material were eroded from the steeper parts of the Artizón Valley (mean slope >15°) and deposited further downstream in the flatter part of the Santa Cruz Valley (mean slope <2°; confluence of the two valleys at 3 985 m a.s.l.). The flood affected two debris cone-dammed lakes (Jatuncocha and Ichiccocha) in the Santa Cruz Valley. Some minor damages to the dam of Lake Jatuncocha were documented. Geomprohological evidence of the event was observed more than 20 km downstream from Lake Artizón Alto. The described multi-LOF event was employed as a particularly challenging test case for the currently developed, GIS-based two-phase dynamic mass flow model r.avaflow. Whilst the test results are very promising, lessons learned for r.avaflow model are the need for (i) an improved concept to determine the flow boundaries; and (ii) thorough parameter tests. High demands on the resolution and quality of the DEM are revealed. From our event and modelling analysis we conclude the following: mass movements in the headwaters of hydrologically connected lake and river systems may affect the catchment in complex and cascading ways. Flood and mass flow magnitudes can be both intensified or attenuated along the pathway. Geomorphological analysis and related modelling efforts may elucidate the related hazards as a basis to reduce the associated risks to downstream communities and infrastructures. Keywords: cascading processes, dam failure, glacial lake outburst flood (GLOF), high-mountain lakes, r.avaflow

  17. Military Hydrology. Report 20. Reservoir Outflow (RESOUT) Model

    DTIC Science & Technology

    1991-04-01

    and/or be withdrawn from the river at some distance below the dam . In other cases, the outlet works discharges directly into a canal or pipe conveyance... dams are cited in Table 3 (USAGE 1965). 150. Darcy-Weisbach eguation, The head loss resulting from pipe fric- tion may also be determined using the Darcy... dam breach and computes the resulting outflow hydrograph. Example 8 Dam Breach Simulation ID Example 8 ID Dam Breach Simulation ID 10 1 0 KK Teton CG

  18. Histological and Metabolic State of Dams Suckling Small Litter or MSG-Treated Pups.

    PubMed

    Capriglioni Cancian, Claudia Regina; Leite, Nayara Carvalho; Montes, Elisangela Gueiber; Fisher, Stefani Valeria; Waselcoski, Leticia; Lopes Stal, Emily Caroline; Christoforo, Renata Zanardini; Grassiolli, Sabrina

    Lactation is an important function that is dependent on changes in the maternal homeostasis and sustained by histological maternal adjustments. We evaluated how offspring manipulations during the lactational phase can modulate maternal morphologic aspects in the mammary gland, adipose tissue, and pancreatic islets of lactating dams. Two different models of litter-manipulation-during-lactation were used: litter sizes, small litters (SL) or normal litters (NL) and subcutaneous injections in the puppies of monosodium glutamate (MSG), or saline (CON). SL Dams and MSG Dams presented an increase in WAT content and higher plasma levels of glucose, triglycerides, and insulin, in relation to NL Dams and CON Dams, respectively. The MG of SL Dams and MSG Dams presented a high adipocyte content and reduced alveoli development and the milk of the SL Dams presented a higher calorie and triglyceride content, compared to that of the NL Dams. SL Dams presented a reduction in islet size and greater lipid droplet accumulation in BAT, in relation to NL Dams. SL Dams and MSG Dams present similar responses to offspring manipulation during lactation, resulting in changes in metabolic parameters. These alterations were associated with higher fat accumulation in BAT and changes in milk composition only in SL Dams.

  19. Histological and Metabolic State of Dams Suckling Small Litter or MSG-Treated Pups

    PubMed Central

    Capriglioni Cancian, Claudia Regina; Montes, Elisangela Gueiber; Fisher, Stefani Valeria; Waselcoski, Leticia; Lopes Stal, Emily Caroline; Christoforo, Renata Zanardini; Grassiolli, Sabrina

    2016-01-01

    Lactation is an important function that is dependent on changes in the maternal homeostasis and sustained by histological maternal adjustments. We evaluated how offspring manipulations during the lactational phase can modulate maternal morphologic aspects in the mammary gland, adipose tissue, and pancreatic islets of lactating dams. Two different models of litter-manipulation-during-lactation were used: litter sizes, small litters (SL) or normal litters (NL) and subcutaneous injections in the puppies of monosodium glutamate (MSG), or saline (CON). SL Dams and MSG Dams presented an increase in WAT content and higher plasma levels of glucose, triglycerides, and insulin, in relation to NL Dams and CON Dams, respectively. The MG of SL Dams and MSG Dams presented a high adipocyte content and reduced alveoli development and the milk of the SL Dams presented a higher calorie and triglyceride content, compared to that of the NL Dams. SL Dams presented a reduction in islet size and greater lipid droplet accumulation in BAT, in relation to NL Dams. SL Dams and MSG Dams present similar responses to offspring manipulation during lactation, resulting in changes in metabolic parameters. These alterations were associated with higher fat accumulation in BAT and changes in milk composition only in SL Dams. PMID:28004032

  20. Mathematical Modeling in Systems for Operational Evaluation of the Stress-Strain State of the Arch-Gravity Dam at the Sayano-Shushenskaya Hydroelectric Power Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bellendir, E. N.; Gordon, L. A., E-mail: lev-gordon@mail.ru; Khrapkov, A. A.

    Current studies of the stress-strain state of the dam at the Sayano-Shushenskaya Hydroelectric Power Plant at VNIIG based on mathematical modeling including full scale and experimental data are described. Applications and programs intended for automatic operational evaluation of the stress-strain state of the dam for optimizing control of the upper race level in the course of the annual filling-drawdown cycle and during seismic events are examined. Improvements in systems for monitoring the stress-strain state of concrete dams are proposed.

  1. Development of Probabilistic Flood Inundation Mapping For Flooding Induced by Dam Failure

    NASA Astrophysics Data System (ADS)

    Tsai, C.; Yeh, J. J. J.

    2017-12-01

    A primary function of flood inundation mapping is to forecast flood hazards and assess potential losses. However, uncertainties limit the reliability of inundation hazard assessments. Major sources of uncertainty should be taken into consideration by an optimal flood management strategy. This study focuses on the 20km reach downstream of the Shihmen Reservoir in Taiwan. A dam failure induced flood herein provides the upstream boundary conditions of flood routing. The two major sources of uncertainty that are considered in the hydraulic model and the flood inundation mapping herein are uncertainties in the dam break model and uncertainty of the roughness coefficient. The perturbance moment method is applied to a dam break model and the hydro system model to develop probabilistic flood inundation mapping. Various numbers of uncertain variables can be considered in these models and the variability of outputs can be quantified. The probabilistic flood inundation mapping for dam break induced floods can be developed with consideration of the variability of output using a commonly used HEC-RAS model. Different probabilistic flood inundation mappings are discussed and compared. Probabilistic flood inundation mappings are hoped to provide new physical insights in support of the evaluation of concerning reservoir flooded areas.

  2. Surprise and opportunity for learning in Grand Canyon: the Glen Canyon Dam Adaptive Management Program

    USGS Publications Warehouse

    Melis, Theodore S.; Walters, Carl; Korman, Josh

    2015-01-01

    With a focus on resources of the Colorado River ecosystem below Glen Canyon Dam, the Glen Canyon Dam Adaptive Management Program has included a variety of experimental policy tests, ranging from manipulation of water releases from the dam to removal of non-native fish within Grand Canyon National Park. None of these field-scale experiments has yet produced unambiguous results in terms of management prescriptions. But there has been adaptive learning, mostly from unanticipated or surprising resource responses relative to predictions from ecosystem modeling. Surprise learning opportunities may often be viewed with dismay by some stakeholders who might not be clear about the purpose of science and modeling in adaptive management. However, the experimental results from the Glen Canyon Dam program actually represent scientific successes in terms of revealing new opportunities for developing better river management policies. A new long-term experimental management planning process for Glen Canyon Dam operations, started in 2011 by the U.S. Department of the Interior, provides an opportunity to refocus management objectives, identify and evaluate key uncertainties about the influence of dam releases, and refine monitoring for learning over the next several decades. Adaptive learning since 1995 is critical input to this long-term planning effort. Embracing uncertainty and surprise outcomes revealed by monitoring and ecosystem modeling will likely continue the advancement of resource objectives below the dam, and may also promote efficient learning in other complex programs.

  3. Probabilistic mapping of urban flood risk: Application to extreme events in Surat, India

    NASA Astrophysics Data System (ADS)

    Ramirez, Jorge; Rajasekar, Umamaheshwaran; Coulthard, Tom; Keiler, Margreth

    2016-04-01

    Surat, India is a coastal city that lies on the banks of the river Tapti and is located downstream from the Ukai dam. Given Surat's geographic location, the population of five million people are repeatedly exposed to flooding caused by high tide combined with large emergency dam releases into the Tapti river. In 2006 such a flood event occurred when intense rainfall in the Tapti catchment caused a dam release near 25,000 m3 s-1 and flooded 90% of the city. A first step towards strengthening resilience in Surat requires a robust method for mapping potential flood risk that considers the uncertainty in future dam releases. Here, in this study we develop many combinations of dam release magnitude and duration for the Ukai dam. Afterwards we use these dam releases to drive a two dimensional flood model (CAESAR-Lisflood) of Surat that also considers tidal effects. Our flood model of Surat utilizes fine spatial resolution (30m) topography produced from an extensive differential global positioning system survey and measurements of river cross-sections. Within the city we have modelled scenarios that include extreme conditions with near maximum dam release levels (e.g. 1:250 year flood) and high tides. Results from all scenarios have been summarized into probabilistic flood risk maps for Surat. These maps are currently being integrated within the city disaster management plan for taking both mitigation and adaptation measures for different scenarios of flooding.

  4. Strain Analysis in Horizontal Geodetic Network of Dams for Control of Stability and Monitoring Deformation

    NASA Astrophysics Data System (ADS)

    Roohi, S.; Ardalan, A. A.; Khodakarami, M.

    2009-04-01

    Dams as one of the engineering structures play very important role in human life. Because, from primary human needs such as providing drinking water to professional needs such as water powerhouse creation in order to provide power for industrial centers, hospitals, manufactures and agriculture, have considerable dependent on dams. In addition destruction of a dam can be as dangerous as earthquake. Therefore maintenance, stability control and monitoring deformation of them is indispensable. In order to control stability of dams and their around lands and monitoring deformation a network is created by surveyor, geologist and dam experts on crest and body of dam or on land near the dam. Geodetic observations are done in this network by precise surveying instrument in deferent time then by using linear least square parametric adjustment method, adjusted coordinates with their variance- covariance matrix and error ellipses, redundancy numbers for observation, blunders and … are estimated in each epoch. Then displacement vectors are computed in each point of network, After that by use of Lagrangeian deformation idea and constitution of deformation equations movement, displacement model is determined and strain tensor is computed. we can induce deformation information from strain tensor in different ways such as strain ellipse then interpret deformation that happen in each point of network. Also we can compute rigid rotation from anti-symmetric part of displacement gradient tensor. After processing tow consequence epochs observations of horzontal geodetic network of Hnna dam in southwest of Esfahan, the most semi-major axis of error ellipse is estimated about 0.9mm for point D10, largest displacement is 1.4mm for point C3 that it's semimajor axis of displacement error ellipse is 1.3mm and there is different shear in all of network points exceptional points D2,C3 and C2. There is different dilatation in most of points. These amount of maximum shear and dilatation are justified because of horizontal displacement and subsidence of dam due to pressure of water that conserve behind it. Key word: strain tensor, monitoring deformation, Geodetic network, deformation equation movement, error ellipse, strain ellipse, shear, dilatation

  5. National Dam Inspection Program. Colonial Dam Number 1. (NDI Number PA-00206, PennDER Number 26-12) Ohio River Basin, Allen Run, Fayette County, Pennsylvania. Phase I Inspection Report,

    DTIC Science & Technology

    1980-05-01

    the structure. It is important to note that the condition of the dam depends on numerous and constantly changing internal and external factors which are...observations of condi- tions as they existed on the date of the field inspec- tion, the general condition of the Colonial Dam No. 1 is considered to be fair ...95.53)( 75.71)( 36.90)( 16.26) S3mARr OF DAM SAFlMT ANALYSIS PLAN I ............... INITIAL VALUE SPLILWAT CREZS TOP OP DAM E.EVATION 966.00 966.00

  6. Negligible contribution of reservoir dams to organic and inorganic transport in the lower Mimi River, Japan

    NASA Astrophysics Data System (ADS)

    Nukazawa, Kei; Kihara, Kousuke; Suzuki, Yoshihiro

    2017-12-01

    Rivers fulfill an essential ecological role by forming networks for material transport from upland forests to coastal areas. The way in which dams affect the organic and inorganic cycles in such systems is not well understood. Herein, we investigated the longitudinal profiles of the various components of the water chemistry across three cascade dams in Japan: the Yamasubaru Dam, Saigou Dam, and Ohuchibaru Dam, which are situated along the sediment-productive Mimi River in different flow conditions. We analyzed the following water quality components: suspended solids (SS), turbidity, total iron (TFe), dissolved iron (DFe), total organic carbon (TOC), total nitrogen (TN), total phosphorus (TP), humic substance (HS), and major ionic components (Na+, Mg2+, Ca2+, Cl-, NO3-, and SO42-) in the downstream channels of the three dams during the low-intermediate-flow and high-flow events from 2012 to 2014. We estimated hourly loads of each component using hourly turbidity data and discharge data (i.e., L-Q model) separately, and the results are integrated to estimate the annual fluxes. The annual fluxes between the methods were compared to verify predictability of the conventional L-Q models. Annual flux of TOC, TN, DFe, and HS estimated by the turbidity displayed similar values, whereas the flux of SS, TFe, and TP tended to increase downstream of the dams. Among the dams, estimated flux proportions for TP and TFe were higher during high-flow events (74%-94%). Considering geographic conditions (e.g., absence of major tributary between the dams), the result implies that accumulated TP and TFe in the reservoirs may be flushed and transported downstream with SS over the short height dams during flood events. Assuming this process, the reservoir dams probably make only a fractional contribution to the organic and inorganic transport in the catchment studied. The percent flux errors for SS, TFe, and TP fluxes ranged from -7.2% to -97% (except for the TP flux in 2013), which highlights the risk of underestimating these components when using an L-Q model.

  7. Influence of maternal hyperthyroidism in the rat on the expression of neuronal and astrocytic cytoskeletal proteins in fetal brain.

    PubMed

    Evans, I M; Pickard, M R; Sinha, A K; Leonard, A J; Sampson, D C; Ekins, R P

    2002-12-01

    Maternal hypothyroidism during pregnancy impairs brain function in human and rat offspring, but little is known regarding the influence of maternal hyperthyroidism on neurodevelopment. We have previously shown that the expression of neuronal and glial differentiation markers in fetal brain is compromised in hypothyroid rat dam pregnancies and have now therefore extended this investigation to hyperthyroid rat dams. Study groups comprised partially thyroidectomised dams, implanted with osmotic pumps infusing either vehicle (TX dams) or a supraphysiological dose of thyroxine (T4) (HYPER dams), and euthyroid dams infused with vehicle (N dams). Cytoskeletal protein abundance was determined in fetal brain at 21 days of gestation by immunoblot analysis. Relative to N dams, circulating total T4 levels were reduced to around one-third in TX dams but were doubled in HYPER dams. Fetal brain weight was increased in HYPER dams, whereas litter size and fetal body weight were reduced in TX dams. Glial fibrillary acidic protein expression was similar in HYPER and TX dams, being reduced in both cases relative to N dams. alpha-Internexin (INX) abundance was reduced in HYPER dams and increased in TX dams, whereas neurofilament 68 (NF68) exhibited increased abundance in HYPER dams. Furthermore, INX was inversely related to - and NF68 directly related to - maternal serum total T4 levels, independently of fetal brain weight. In conclusion, maternal hyperthyroidism compromises the expression of neuronal cytoskeletal proteins in late fetal brain, suggestive of a pattern of accelerated neuronal differentiation.

  8. Predicting the thermal effects of dam removal on the Klamath River

    USGS Publications Warehouse

    Bartholow, J.M.; Campbell, S.G.; Flug, M.

    2004-01-01

    The Klamath River once supported large runs of anadromous salmonids. Water temperature associated with multiple mainstem hydropower facilities might be one of many factors responsible for depressing Klamath salmon stocks. We combined a water quantity model and a water quality model to predict how removing the series of dams below Upper Klamath Lake might affect water temperatures, and ultimately fish survival, in the spawning and rearing portions of the mainstem Klamath. We calibrated the water quantity and quality models and applied them for the hydrometeorological conditions during a 40-year postdam period. Then, we hypothetically removed the dams and their impoundments from the models and reestimated the river’s water temperatures. The principal thermal effect of dam and reservoir removal would be to restore the timing (phase) of the river’s seasonal thermal signature by shifting it approximately 18 days earlier in the year, resulting in river temperatures that more rapidly track ambient air temperatures. Such a shift would likely cool thermal habitat conditions for adult fall chinook (Oncorhynchus tshawytscha) during upstream migration and benefit mainstem spawning. By contrast, spring and early summer temperatures could be warmer without dams, potentially harming chinook rearing and outmigration in the mainstem. Dam removal might affect the river’s thermal regime during certain conditions for over 200 km of the mainstem.

  9. Reconstructing Sediment Supply, Transport and Deposition Behind the Elwha River Dams

    NASA Astrophysics Data System (ADS)

    Beveridge, C.

    2017-12-01

    The Elwha River watershed in Olympic National Park of Washington State, USA is predominantly a steep, mountainous landscape where dominant geomorphic processes include landslides, debris flows and gullying. The river is characterized by substantial variability of channel morphology and fluvial processes, and alternates between narrow bedrock canyons and wider alluvial reaches for much of its length. Literature suggests that the Elwha watershed is topographically and tectonically in steady state. The removal of the two massive hydropower dams along the river in 2013 marked the largest dam removal in history. Over the century long lifespan of the dams, approximately 21 million cubic meters of sediment was impounded behind them. Long term erosion rates documented in this region and reservoir sedimentation data give unprecedented opportunities to test watershed sediment yield models and examine dominant processes that control sediment yield over human time scales. In this study, we aim to reconstruct sediment supply, transport and deposition behind the Glines Canyon Dam (most upstream dam) over its lifespan using a watershed modeling approach. We developed alternative models of varying complexity for sediment production and transport at the network scale driven by hydrologic forcing. We simulate sediment supply and transport in tributaries upstream of the dam. The modeled sediment supply and transport dynamics are based on calibrated formulae (e.g., bedload transport is simulated using Wilcock-Crowe 2003 with modification based on observed bedload transport in the Elwha River). Observational data that aid in our approach include DEM, channel morphology, meteorology, and streamflow and sediment (bedload and suspended load) discharge. We aim to demonstrate how the observed sediment yield behind the dams was influenced by upstream transport supply and capacity limitations, thereby demonstrating the scale effects of flow and sediment transport processes in the Elwha River watershed.

  10. Hydrological Analysis for Inflow Forecasting into Temengor Dam

    NASA Astrophysics Data System (ADS)

    Najid, MI; Sidek, LM; Hidayah, B.; Roseli, ZA

    2016-03-01

    These days, natural disaster such as flood is the main concern for hydrologists. One of solutions in understanding the reason of flood is by prediction of the event sooner than normal occurrence. One of the criteria is lead time or travel time that is important in the study of fresh waters and flood events. Therefore, estimation of lead or travel time for flood event can be beneficial primary information. The objective of this study is to estimate the lead time or travel time for outlet of Temengor dam in Malaysia. Tenaga Nasional Berhad (TNB) Sungai Perak dam operation has the main contribution on decision support for early water released and flood warning to authorities and locals resident for in the down streams area. For this study, hydrological analysis carried out will help to determine which years that give more rainfall contribution into the reservoir. Rainfall contribution of reservoir help to understanding rainfall distribution and peak discharge on that period. It also help for calibration of forecasting model system for better accuracy of flood hydrograph. There may be various methods to determine the rainfall contribution of catchment. The result has shown that, the rainfall contribution for Temengor catchment, is more on November in each year which is the monsoon season in Malaysia. TNB dam operational decision support systems can prepare and be more aware at this time for flood control and flood mitigation.

  11. Improved Algorithms for Blending Dam Releases to Meet Downstream Water-Temperature Targets in the CE-QUAL-W2 Water-Quality Model

    NASA Astrophysics Data System (ADS)

    Rounds, S. A.; Buccola, N. L.

    2014-12-01

    The two-dimensional (longitudinal, vertical) water-quality model CE-QUAL-W2, version 3.7, was enhanced with new features to help dam operators and managers efficiently explore and optimize potential solutions for temperature management downstream of thermally stratified reservoirs. Such temperature management often is accomplished by blending releases from multiple dam outlets that access water of different temperatures at different depths in the reservoir. The original blending algorithm in this version of the model was limited to mixing releases from two outlets at a time, and few constraints could be imposed. The new enhanced blending algorithm allows the user to (1) specify a time-series of target release temperatures, (2) designate from 2 to 10 floating or fixed-elevation outlets for blending, (3) impose maximum head constraints as well as minimum and maximum flow constraints for any blended outlet, and (4) set a priority designation for each outlet that allows the model to choose which outlets to use and how to balance releases among them. The modified model was tested against a previously calibrated model of Detroit Lake on the North Santiam River in northwestern Oregon, and the results compared well. The enhanced model code is being used to evaluate operational and structural scenarios at multiple dam/reservoir systems in the Willamette River basin in Oregon, where downstream temperature management for endangered fish is a high priority for resource managers and dam operators. These updates to the CE-QUAL-W2 blending algorithm allow scenarios involving complicated dam operations and/or hypothetical outlet structures to be evaluated more efficiently with the model, with decreased need for multiple/iterative model runs or preprocessing of model inputs to fully characterize the operational constraints.

  12. Seepage-Based Factor of Safety Analysis Using 3D Groundwater Simulation Results

    DTIC Science & Technology

    2014-08-01

    Edris, and D . Richards. 2006. A first-principle, physics- based watershed model: WASH123D. In Watershed models, ed. V. P. Singh and D . K . Frevert...should be cited as follows: Cheng, H.-P., K . D . Winters, S. M. England, and R. E. Pickett. 2014. Factor of safety analysis using 3D groundwater...Journal of Dam Safety 11(3): 33–42. Pickett, R. E., K . D . Winters, H.-P. Cheng, and S. M. England. 2013. Herbert Hoover Dike (HHD) flow model. Project

  13. A 3D smoothed particle hydrodynamics model for erosional dam-break floods

    NASA Astrophysics Data System (ADS)

    Amicarelli, Andrea; Kocak, Bozhana; Sibilla, Stefano; Grabe, Jürgen

    2017-11-01

    A mesh-less smoothed particle hydrodynamics (SPH) model for bed-load transport on erosional dam-break floods is presented. This mixture model describes both the liquid phase and the solid granular material. The model is validated on the results from several experiments on erosional dam breaks. A comparison between the present model and a 2-phase SPH model for geotechnical applications (Gadget Soil; TUHH) is performed. A demonstrative 3D erosional dam break on complex topography is investigated. The present 3D mixture model is characterised by: no tuning parameter for the mixture viscosity; consistency with the Kinetic Theory of Granular Flow; ability to reproduce the evolution of the free surface and the bed-load transport layer; applicability to practical problems in civil engineering. The numerical developments of this study are represented by a new SPH scheme for bed-load transport, which is implemented in the SPH code SPHERA v.8.0 (RSE SpA), distributed as FOSS on GitHub.

  14. The Effects of Dams on Downstream Channel Characteristics in Pennsylvania and Maryland: Assessing the Potential Consequences of Dam Removal

    NASA Astrophysics Data System (ADS)

    Skalak, K. J.; Pizzuto, J. E.; Jenkins, P.

    2003-12-01

    The potential downstream effects of dam removal were assessed on fifteen sites of varying dam size and characteristics in Pennsylvania and Maryland. The dams ranged in size from a 30 cm high fish weir to a water supply dam 57 m high. Stream order ranged from 1 to 4. The dams are located in watersheds with varying degrees of human disturbance and urbanization. The dams are also operated differently, with significant consequences for hydraulic residence time and downstream flow variability. Most streams were alluvial, but 6 of the reaches were clearly bedrock channels. We hypothesize that the channel upstream, which is unaffected by the dam, will provide an accurate model for the channel downstream of the dam long after dam removal. Therefore, reaches upstream and downstream of the dam were compared to determine the effects of the dam as well as the condition of the stream that will ultimately develop decades after dam removal. Surprisingly, the dams had no consistent influence on channel morphology. However, the percentage of sand is significantly lower downstream than upstream: the mean % sand downstream is 11.47%, while the mean % sand upstream is 21.39%. The coarser fractions of the bed, as represented by the 84th percentile grain diameter, are unaffected by the presence of the dam. These results imply that decades after dam removal, the percentage of sand on the bed will increase, but the coarse fraction of the bed will remain relatively unchanged.

  15. Identifying and Evaluating Options for Improving Sediment Management and Fish Passage at Hydropower Dams in the Lower Mekong River Basin

    NASA Astrophysics Data System (ADS)

    Wild, T. B.; Reed, P. M.; Loucks, D. P.

    2015-12-01

    The Mekong River basin in Southeast Asia is undergoing intensive and pervasive hydropower development to satisfy demand for increased energy and income to support its growing population of 60 million people. Just 20 years ago this river flowed freely. Today some 30 large dams exist in the basin, and over 100 more are being planned for construction. These dams will alter the river's natural water, sediment and nutrient flows, thereby impacting river morphology and ecosystems, and will fragment fish migration pathways. In doing so, they will degrade one of the world's most valuable and productive freshwater fish habitats. For those dams that have not yet been constructed, there still exist opportunities to modify their siting, design and operation (SDO) to potentially achieve a more balanced set of tradeoffs among hydropower production, sediment/nutrient passage and fish passage. We introduce examples of such alternative SDO opportunities for Sambor Dam in Cambodia, planned to be constructed on the main stem of the Mekong River. To evaluate the performance of such alternatives, we developed a Python-based simulation tool called PySedSim. PySedSim is a daily time step mass balance model that identifies the relative tradeoffs among hydropower production, and flow and sediment regime alteration, associated with reservoir sediment management techniques such as flushing, sluicing, bypassing, density current venting and dredging. To date, there has been a very limited acknowledgement or evaluation of the significant uncertainties that impact the evaluation of SDO alternatives. This research is formalizing a model diagnostic assessment of the key assumptions and parametric uncertainties that strongly influence PySedSim SDO evaluations. Using stochastic hydrology and sediment load data, our diagnostic assessment evaluates and compares several Sambor Dam alternatives using several performance measures related to energy production, sediment trapping and regime alteration, and fish passage. We show that performance of the alternatives can be highly variable, and conduct a simultaneous multi-parameter factor screening sensitivity analysis to identify the subset of PySedSim model parameters that contribute most significantly to performance uncertainties in attempts to identify the more robust options.

  16. Using a High-Resolution Ensemble Modeling Method to Inform Risk-Based Decision-Making at Taylor Park Dam, Colorado

    NASA Astrophysics Data System (ADS)

    Mueller, M.; Mahoney, K. M.; Holman, K. D.

    2015-12-01

    The Bureau of Reclamation (Reclamation) is responsible for the safety of Taylor Park Dam, located in central Colorado at an elevation of 9300 feet. A key aspect of dam safety is anticipating extreme precipitation, runoff and the associated inflow of water to the reservoir within a probabilistic framework for risk analyses. The Cooperative Institute for Research in Environmental Sciences (CIRES) has partnered with Reclamation to improve understanding and estimation of precipitation in the western United States, including the Taylor Park watershed. A significant challenge is that Taylor Park Dam is located in a relatively data-sparse region, surrounded by mountains exceeding 12,000 feet. To better estimate heavy precipitation events in this basin, a high-resolution modeling approach is used. The Weather Research and Forecasting (WRF) model is employed to simulate events that have produced observed peaks in streamflow at the location of interest. Importantly, an ensemble of model simulations are run on each event so that uncertainty bounds (i.e., forecast error) may be provided such that the model outputs may be more effectively used in Reclamation's risk assessment framework. Model estimates of precipitation (and the uncertainty thereof) are then used in rainfall runoff models to determine the probability of inflows to the reservoir for use in Reclamation's dam safety risk analyses.

  17. A multi-year analysis of passage and survival at McNary Dam, 2004-09

    USGS Publications Warehouse

    Adams, Noah S.; Walker, C.E.; Perry, R.W.

    2011-01-01

    We analyzed 6 years (2004–09) of passage and survival data collected at McNary Dam to determine how dam operations and environmental conditions affect passage and survival of juvenile salmonids. A multinomial logistic regression was used to examine how environmental variables and dam operations relate to passage behavior of juvenile salmonids at McNary Dam. We used the Cormack-Jolly-Seber release-recapture model to determine how the survival of juvenile salmonids passing through McNary Dam relates to environmental variables and dam operations. Total project discharge and the proportion of flow passing the spillway typically had a positive effect on survival for all species and routes. As the proportion of water through the spillway increased, the number of fish passing the spillway increased, as did overall survival. Additionally, survival generally was higher at night. There was no meaningful difference in survival for fish that passed through the north or south portions of the spillway or powerhouse. Similarly, there was no difference in survival for fish released in the north, middle, or south portions of the tailrace. For subyearling Chinook salmon migrating during the summer season, increased temperatures had a drastic effect on passage and survival. As temperature increased, survival of subyearling Chinook salmon decreased through all passage routes and the number of fish that passed through the turbines increased. During years when the temporary spillway weirs (TSWs) were installed, passage through the spillway increased for spring migrants. However, due to the changes made in the location of the TSW between years and the potential effect of other confounding environmental conditions, it is not certain if the increase in spillway passage was due solely to the presence of the TSWs. The TSWs appeared to improve forebay survival during years when they were operated.

  18. Ground failure in the 2001 Mw 8.4 southern Peru earthquake

    NASA Astrophysics Data System (ADS)

    Rondinel-Oviedo, Efrain Alejandro

    On June 23rd 2001 a moment magnitude (M W) 8.4, earthquake shook the southern portion of Peru. This rare large-magnitude event provided a unique opportunity to develop a suite of high quality case histories and also to test and calibrate existing geotechnical earthquake engineering analysis procedures and models against observations from the earthquake. The work presented in this thesis is focused on three topics pertaining to ground failure (i.e., the permanent deformation of the ground resulting from an earthquake) observed during the event: (1) surface ground damage in small basin geometries, (2) seismic compression, and (3) performance of a concrete faced rockfill dam (CFRD) dam. Surface ground strain damage patterns in small basin geometries has previously been typically studied at the large (i.e., geological) scale, but not at the scale of civil engineering infrastructure. During seismic events basin geometries containing soft material confined by stiffer material trap the seismic waves and generate surface waves that travel on the ground along the soft material. Numerical modeling shows that surface waves are generated at basin edges and travel on the ground creating higher duration, higher response (peak ground acceleration, PGA), higher energy (Arias Intensity) and higher angular distortion, especially in zones close to the edges. The impedance contrast between the stiff material and the soft material, and the dip angle play an important role in basin response. Seismic compression (i.e., the shaking induced densification of unsaturated soil) was observed in many highway embankments in the region of the earthquake. In many instances, this phenomenon was exasperated by soil-structure interaction with adjacent bridge or culvert structures. Numerical modeling conducted as part of this research showed (i) a significantly different response when the structure (culvert) is considered, (ii) impedance contrast plays a role in the system responses, and (iii) low horizontal stresses are observed when the peak of the shear strain occurs. It is believed that the effect of low confining stresses was responsible for the large amounts of settlement observed, and which was not directly captured by classical seismic compression models. The third topic of study considered evaluates the performance of a concrete faced rockfill dam (CFRD) dam in the earthquake. Analysis considered the effect of the time, PGA of rock, and change in amplification ratio with PGA. It appears that the natural frequency of the dam increases with time in the transversal direction and slightly decreases in the longitudinal direction. It is believed that the increase in the natural frequency might be associated with change in the dam stiffness (i.e. densification) with time. However, reason for the slight decrease in the longitudinal direction is not clear and requires further research.

  19. Experimental stocking of sport fish in the regulated Tallapoosa River to determine critical periods for recruitment

    USGS Publications Warehouse

    Lloyd, M. Clint; Lai, Quan; Sammons, Steve; Irwin, Elise R.

    2017-01-01

    The stocking of fish in riverine systems to re-establish stocks for conservation and management appears limited to a few species and often occurs in reaches impacted by impoundments. Stocking of sport fish species such as centrarchids and ictalurids is often restricted to lentic environments, although stocking in lotic environments is feasible with variable success. R. L. Harris Dam on the Tallapoosa River, Alabama is the newest and uppermost dam facility on the river (operating since 1983); flows from the dam have been managed adaptively for multiple stakeholder objectives since 2005. One of the stakeholders’ primary objectives is to provide quality sport fisheries in the Tallapoosa River in the managed area below the dam. Historically, ictalurids and cyprinids dominated the river above Lake Martin. However, investigations after Harris Dam closed have detected a shift in community structure to domination by centrarchids. Flow management (termed the Green Plan) has been occurring since March 2005; however, sport fish populations as measured by recruitment of age-1 sport fishes below the dam has not responded adequately to flow management. The objectives of this research were to: (1) determine if stocking Channel Catfish Ictalurus punctatus and Redbreast Sunfish Lepomis auritus influences year-class strength; (2) estimate vital rates (i.e. growth, mortality, and recruitment) for Channel Catfish populations for use in an age-based population model; and (3) identify age-specific survivorship and fecundity rates contributing to Channel Catfish population stability. No marked Redbreast Sunfish were recaptured due to poor marking efficacy and therefore no further analysis was conducted with this species. Stocked Channel Catfish, similarly, were not recaptured, leaving reasons for non-recapture unknown. Matrix models exploring vital rates illustrated survival to age-1 for Channel Catfish to be less than 0.03% and that survival through ages 2 – 4 had equal contribution to overall population growth, indicating recruitment limitation may impact population size and stability. Results from this study indicate stock enhancement of sport fish populations below Harris Dam may not be an effective management technique at this time.

  20. Quantitative and histological assessment of maternal-fetal transmission of Trypanosoma cruzi in guinea pigs: An experimental model of congenital Chagas disease

    PubMed Central

    Torres-Vargas, Jatziri; Jiménez-Coello, Matilde; Guzmán-Marín, Eugenia; Acosta-Viana, Karla Y.; Yadon, Zaida E.; Gutiérrez-Blanco, Eduardo; Guillermo-Cordero, José Leonardo

    2018-01-01

    Objective We evaluated the effect of Trypanosoma cruzi infection on fertility, gestation outcome, and maternal-fetal transmission in guinea pigs (Cavia porcellus). Methods Animals were infected with T. cruzi H4 strain (TcI lineage) before gestation (IBG) or during gestation (IDG). Tissue and sera samples of dams and fetuses were obtained near parturition. Results All IBG and IDG dams were seropositive by two tests, and exhibited blood parasite load of 1.62±2.2 and 50.1±62 parasites/μl, respectively, by quantitative PCR. Histological evaluation showed muscle fiber degeneration and cellular necrosis in all infected dams. Parasite nests were not detected in infected dams by histology. However, qPCR analysis detected parasites-eq/g heart tissue of 153±104.7 and 169.3±129.4 in IBG and IDG dams, respectively. All fetuses of infected dams were positive for anti-parasite IgG antibodies and tissue parasites by qPCR, but presented a low level of tissue inflammatory infiltrate. Fetuses of IDG (vs. IBG) dams exhibited higher degree of muscle fiber degeneration and cellular necrosis in the heart and skeletal tissues. The placental tissue exhibited no inflammatory lesions and amastigote nests, yet parasites-eq/g of 381.2±34.3 and 79.2±84.9 were detected in IDG and IBG placentas, respectively. Fetal development was compromised, and evidenced by a decline in weight, crow-rump length, and abdominal width in both groups. Conclusions T. cruzi TcI has a high capacity of congenital transmission even when it was inoculated at a very low dose before or during gestation. Tissue lesions, parasite load, and fetal under development provide evidence for high virulence of the parasite during pregnancy. Despite finding of high parasite burden by qPCR, placentas were protected from cellular damage. Our studies offer an experimental model to study the efficacy of vaccines and drugs against congenital transmission of T. cruzi. These results also call for T. cruzi screening in pregnant women and adequate follow up of the newborns in endemic areas. PMID:29364882

  1. Geomorphic change on the Missouri River during the flood of 2011: Chapter I in 2011 Floods of the Central United States

    USGS Publications Warehouse

    Schenk, Edward R.; Skalak, Katherine J.; Benthem, Adam J.; Dietsch, Benjamin J.; Woodward, Brenda K.; Wiche, Gregg J.; Galloway, Joel M.; Nustad, Rochelle A.; Hupp, Cliff R.

    2014-01-01

    The 2011 flood on the Missouri River was one of the largest floods since the river became regulated by a series of high dams in the mid-20th century (greater than 150,000 cubic feet per second during the peak). The flood persisted through most of the summer, eroding river banks, adding sand to sandbars, and moving the thalweg of the channel in many places. The U.S. Geological Survey monitored and assessed the changes in two reaches of the Missouri River: the Garrison Reach in North Dakota, bounded by the Garrison Dam and the Lake Oahe Reservoir, and the Recreational Reach along the boundary of South Dakota and Nebraska bounded upstream by the Gavins Point Dam and extending downstream from Ponca, Nebraska. Historical cross-section data from the Garrison Dam closure until immediately before the flood indicate that the upper reaches of the river near the dam experienced rapid erosion, channel incision, and island/sandbar loss following the dam closure. The erosion, incision, and land loss lessened with time. Conversely, the lower reach near the Lake Oahe Reservoir slackwaters became depositional with channel in-filling and sandbar growth through time as the flow slowed upon reaching the reservoir. Preliminary post-flood results in the Garrison Reach indicate that the main channel has deepened at most cross-sections whereas sandbars and islands have grown vertically. Sandbars and the thalweg migrated within the Recreational Reach, however net scouring and aggradation was minimal. Changes in the two-dimensional area of sandbars and islands are still being assessed using high-resolution satellite imagery. A sediment balance can be constructed for the Garrison Reach using cross-sections, bathymetric data, sand traps for wind-blown material, a quasi-three-dimensional numerical model, and dating of sediment cores. Data collection and analysis for a reach-scale sediment balance and a concurrent analysis of the effects of riparian and island vegetation on sediment deposition currently (2014) is ongoing.

  2. Raman spectroscopy analysis of differences in composition of spent culture media of in vitro cultured preimplantation embryos isolated from normal and fat mice dams.

    PubMed

    Fabian, Dušan; Kačmarová, Martina; Kubandová, Janka; Čikoš, Štefan; Koppel, Juraj

    2016-06-01

    The aim of the present study was to compare overall patterns of metabolic activity of in vitro cultured preimplantation embryos isolated from normal and fat mice dams by means of non-invasive profiling of spent culture media using Raman spectroscopy. To produce females with two different types of body condition (normal and fat), a previously established two-generation model was used, based on overfeeding of experimental mice during prenatal and early postnatal development. Embryos were isolated from spontaneously ovulating and naturally fertilized dams at the 2-cell stage of development and cultured to the blastocyst stage in synthetic oviductal medium KSOMaa. Embryos from fat mice (displaying significantly elevated body weight and fat) showed similar developmental capabilities in vitro as embryos isolated from normal control dams (displaying physiological body weight and fat). The results show that alterations in the composition of culture medium caused by the presence of developing mouse preimplantation embryos can be detected using Raman spectroscopy. Metabolic activity of embryos was reflected in evident changes in numerous band intensities in the 1620-1690cm(-1) (amide I) region and in the 1020-1140cm(-1) region of the Raman spectrum for KSOMaa. Moreover, multivariate analysis of spectral data proved that the composition of proteins and other organic compounds in spent samples obtained after the culture of embryos isolated from fat dams was different from that in spent samples obtained after the culture of embryos from control dams. This study demonstrates that metabolic activity of cultured preimplantation embryos might depend on the body condition of their donors. Copyright © 2016 Society for Biology of Reproduction & the Institute of Animal Reproduction and Food Research of Polish Academy of Sciences in Olsztyn. Published by Elsevier Urban & Partner Sp. z o.o. All rights reserved.

  3. Impacts of settlement, damming, and hydromanagement in two boreal lakes: A comparative paleolimnological study

    USGS Publications Warehouse

    Serieyssol, C.A.; Edlund, M.B.; Kallemeyn, L.W.

    2009-01-01

    Namakan Lake, located in shared border waters in northeastern Minnesota and northwestern Ontario, was subjected to several anthropogenic impacts including logging, damming, water-level manipulations, and perhaps climate change. We used paleolimnology to determine how these stressors impacted Namakan Lake in comparison to a control lake (Lac La Croix) that was not subject to damming and hydromanagement. One core was retrieved from each lake for 210Pb dating and analysis of loss-on-ignition and diatom composition. 210Pb-derived chronologies from the cores indicated that sediment accumulation increased after logging and damming in Namakan Lake; Lac La Croix showed no significant change. Loss-on-ignition analysis also showed an increase in concentration and accumulation of inorganic material after damming in Namakan Lake; again, minimal changes were observed in Lac La Croix. Diatom communities in both lakes displayed community shifts at the peak of logging. Simultaneous, post-1970s diatom community changes may reflect regional climate warming. Taxonomic richness in Namakan Lake decreased sharply after damming and the peak of logging, and was followed by a slow recovery to taxonomic richness similar to that prior to damming. Ecological variability among post-damming diatom communities, however, was greater in Namakan Lake than in Lac La Croix. A diatom calibration set was used to reconstruct historical conductivity and total phosphorus (TP). Lac La Croix showed little historical change in conductivity and TP. In contrast, conductivity increased for several decades in Namakan Lake after damming, possibly in relation to several large fires and flooding. Total phosphorus also increased in Namakan Lake after damming, with a possible decrease in the last decade to pre-damming TP levels. ?? Springer Science+Business Media B.V. 2008.

  4. Modelling riverine habitat for robust redhorse: assessment for reintroduction of an imperilled species

    USGS Publications Warehouse

    Fisk, J. M.; Kwak, Thomas J.; Heise, R. J.

    2014-01-01

    A critical component of a species reintroduction is assessment of contemporary habitat suitability. The robust redhorse, Moxostoma robustum (Cope), is an imperilled catostomid that occupies a restricted range in the south-eastern USA. A remnant population persists downstream of Blewett Falls Dam, the terminal dam in the Pee Dee River, North Carolina. Reintroduction upstream of Blewett Falls Dam may promote long-term survival of this population. Tillery Dam is the next hydroelectric facility upstream, which includes a 30 rkm lotic reach. Habitat suitability indices developed in the Pee Dee River were applied to model suitable habitat for proposed minimum flows downstream of Tillery Dam. Modelling results indicate that the Tillery reach provides suitable robust redhorse habitat, with spawning habitat more abundant than non-spawning habitat. Sensitivity analyses suggested that suitable water depth and substrate were limiting physical habitat variables. These results can inform decisions on flow regulation and guide planning for reintroduction of the robust redhorse and other species.

  5. Dam Construction in Lancang-Mekong River Basin Could Mitigate Future Flood Risk From Warming-Induced Intensified Rainfall: Dam Mitigate Flood Risk in Mekong

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Wei; Lu, Hui; Ruby Leung, L.

    Water resources management, in particular flood control, in the Mekong River Basin (MRB) faces two key challenges in the 21st century: climate change and dam construction. A large scale distributed Geomorphology-Based Hydrological Model coupled with a simple reservoir regulation model (GBHM-MK-SOP) is used to investigate the relative effects of climate change and dam construction on the flood characteristics in the MRB. Results suggest an increase in both flood magnitude and frequency under climate change, which is more severe in the upstream basin and increases over time. However, dam construction and stream regulation reduce flood risk consistently throughout this century, withmore » more obvious effects in the upstream basin where larger reservoirs will be located. The flood mitigation effect of dam regulation dominates over the flood intensification effect of climate change before 2060, but the latter emerges more prominently after 2060 and dominates the flood risk especially in the lower basin.« less

  6. Sediment trapping efficiency of adjustable check dam in laboratory and field experiment

    NASA Astrophysics Data System (ADS)

    Wang, Chiang; Chen, Su-Chin; Lu, Sheng-Jui

    2014-05-01

    Check dam has been constructed at mountain area to block debris flow, but has been filled after several events and lose its function of trapping. For the reason, the main facilities of our research is the adjustable steel slit check dam, which with the advantages of fast building, easy to remove or adjust it function. When we can remove transverse beams to drain sediments off and keep the channel continuity. We constructed adjustable steel slit check dam on the Landow torrent, Huisun Experiment Forest station as the prototype to compare with model in laboratory. In laboratory experiments, the Froude number similarity was used to design the dam model. The main comparisons focused on types of sediment trapping and removing, sediment discharge, and trapping rate of slit check dam. In different types of removing transverse beam showed different kind of sediment removal and differences on rate of sediment removing, removing rate, and particle size distribution. The sediment discharge in check dam with beams is about 40%~80% of check dam without beams. Furthermore, the spacing of beams is considerable factor to the sediment discharge. In field experiment, this research uses time-lapse photography to record the adjustable steel slit check dam on the Landow torrent. The typhoon Soulik made rainfall amounts of 600 mm in eight hours and induced debris flow in Landow torrent. Image data of time-lapse photography demonstrated that after several sediment transport event the adjustable steel slit check dam was buried by debris flow. The result of lab and field experiments: (1)Adjustable check dam could trap boulders and stop woody debris flow and flush out fine sediment to supply the need of downstream river. (2)The efficiency of sediment trapping in adjustable check dam with transverse beams was significantly improved. (3)The check dam without transverse beams can remove the sediment and keep the ecosystem continuity.

  7. Water Management Models in Practice: A Case Study of the Aswan High Dam

    NASA Astrophysics Data System (ADS)

    El-Ashry, M. T.; Alford, D. L.

    1984-04-01

    The stated purpose of this volume is the development and evaluation of operating policies for the Aswan High Dam and their relation to the development of water resources policy in Egypt. That objective is admirably fulfilled through discussions of water use in Egypt and the operation objectives of the High Dam, the behavior of the physical system and simulation of the reservoir, a realtime management model of the dam, management of water shortages and trade-offs between major uses, and coordinated operation of the dam with new upstream as well as downstream developments.The High Dam has been a source of controversy, particularly with regard to its environmental impacts. Its adverse effects include changes in the water table and attendant salt buildup in irrigated areas, excessive growth of aquatic plants below the dam, shoreline erosion, and increases in water-borne diseases such as schistosomiasis (bilharzia). The dam was intended to offset rapid population growth by increasing food supplies through the transformation of irrigated land in southern Egypt from seasonal to perennial cultivation and by providing water for the reclamation of desert land. Unfortunately, such benefits have been outstripped by the rapidly growing population, and water shortages will be experienced by the end of the century.

  8. Outburst floods from glacier-dammed lakes: The effect of mode of lake drainage on flood magnitude

    USGS Publications Warehouse

    Walder, J.S.; Costa, J.E.

    1996-01-01

    Published accounts of outburst floods from glacier-dammed lakes show that a significant number of such floods are associated not with drainage through a tunnel incised into the basal ice - the process generally assumed - but rather with ice-marginal drainage, mechanical failure of part of the ice dam, or both. Non-tunnel floods are strongly correlated with formation of an ice dam by a glacier advancing from a tributary drainage into either a main river valley or a pre-existing body of water (lake or fiord). For a given lake volume, non-tunnel floods tend to have significantly higher peak discharges than tunnel-drainage floods. Statistical analysis of data for floods associated with subglacial tunnels yields the following empirical relation between lake volume V and peak discharge script Q signp : script Q signp = 46V0.66 (r2 = 0.70), when script Q signp is expressed in metres per second and V in millions of cubic metres. This updates the so-called Clague-Mathews relation. For non-tunnel floods, the analogous relation is script Q signp = 1100V0.44 (r2 = 0.58). The latter relation is close to one found by Costa (1988) for failure of constructed earthen dams. This closeness is probably not coincidental but rather reflects similarities in modes of dam failure and lake drainage. We develop a simple physical model of the breach-widening process for non-tunnel floods, assuming that (1) the rate of breach widening is controlled by melting of the ice, (2) outflow from the lake is regulated by the hydraulic condition of critical flow where water enters the breach, and (3) the effect of lake temperature may be dealt with as done by Clarke (1982). Calculations based on the model simulate quite well outbursts from Lake George, Alaska. Dimensional analysis leads to two approximations of the form script Q signp ??? Vqf(hi, ??0), where q = 0.5 to 0.6, hi is initial lake depth, ??0 is lake temperature, and the form of f(hi, ??0) depends on the relative importance of viscous dissipation and the lake's thermal energy in determining the rate of breach opening. These expressions, along with the regression relations, should prove useful for assessing the probable magnitude of breach-type outburst floods.

  9. Transplacental cocaine exposure. 2: Effects of cocaine dose and gestational timing.

    PubMed

    Wilkins, A S; Jones, K; Kosofsky, B E

    1998-01-01

    We have utilized a mouse model of transplacental cocaine exposure to investigate the effects of cocaine dose and gestational timing in altering brain and body growth and postnatal behavior in exposed offspring. Pregnant dams were injected with cocaine HCl at 40 mg/kg/day (COC 40) or 20 mg/kg/day (COC 20), or 10 mg/kg/day (COC 10) SC from embryonic day (E) 8 to E17, or cocaine HCl at 40 mg/kg/day SC from E8 to E13 (COC Early) or from E13 to E17 (COC Late) divided in two daily doses. COC 40 and COC Late dams, as well as dams in nutritionally paired control groups (injected with saline vehicle and pair-fed with the COC dams: SPF 40, SPF 20, SPF 10), demonstrated less weight gain than SAL controls (injected with saline vehicle and allowed access to food ad lib). The surrogate fostered offspring of COC 40 and SPF 40 dams demonstrated brain and body growth retardation [on postnatal day (P) 1 and P9] when compared to pups born to SAL dams. Offspring of COC Late, SPF 20, and SPF 10 dams demonstrated brain and body growth retardation on P1 when compared to pups born to SAL dams. Pups from all groups were tested for first-order Pavlovian conditioning on P9, or for the ability to ignore redundant information in a blocking paradigm on P50. Only COC 40 mice (i.e., offspring born to COC 40 dams) were unable to acquire an aversion to an odor previously paired with shock on P9. When compared with SAL controls, COC 40 mice (and to a less significant extent SPF 40 mice) demonstrated a persistent behavioral deficit in the blocking paradigm on P50, which may reflect alterations in selective attention. Correlation analyses indicated that the dose and gestational timing of transplacental cocaine exposure, and varying degrees of malnutrition, had effects on blocking performance, with greater prenatal cocaine exposure and increased prenatal malnutrition resulting in more significant behavioral impairments. A path regression analysis demonstrated independent and significant effects of prenatal cocaine as well as prenatal malnutrition in contributing to impaired performance in the blocking paradigm. As suggested by the clinical literature, our preclinical data support a model whereby the dose and duration of prenatal cocaine exposure have direct effects on offspring brain and body growth and on behavioral performance.

  10. SpDamID: Marking DNA Bound by Protein Complexes Identifies Notch-Dimer Responsive Enhancers

    PubMed Central

    Hass, Matthew R.; Liow, Hien-haw; Chen, Xiaoting; Sharma, Ankur; Inoue, Yukiko U.; Inoue, Takayoshi; Reeb, Ashley; Martens, Andrew; Fulbright, Mary; Raju, Saravanan; Stevens, Michael; Boyle, Scott; Park, Joo-Seop; Weirauch, Matthew T.; Brent, Michael; Kopan, Raphael

    2015-01-01

    SUMMARY We developed Split DamID (SpDamID), a protein complementation version of DamID, to mark genomic DNA bound in vivo by interacting or juxtapositioned transcription factors. Inactive halves of DAM (DNA Adenine Methyltransferase) were fused to protein pairs to be queried Interaction or proximity enabled DAM reconstitution and methylation of adenine in GATC. Inducible SpDamID was used to analyze Notch-mediated transcriptional activation. We demonstrate that Notch complexes label RBP sites broadly across the genome, and show that a subset of these complexes that recruit MAML and p300 undergo changes in chromatin accessibility in response to Notch signaling. SpDamID differentiates between monomeric and dimeric binding thereby allowing for identification of half-site motifs used by Notch dimers. Motif enrichment of Notch enhancers coupled with SpDamID reveals co-targeting of regulatory sequences by Notch and Runx1. SpDamID represents a sensitive and powerful tool that enables dynamic analysis of combinatorial protein-DNA transactions at a genome-wide level. PMID:26257285

  11. 2005 Tri-Service Infrastructure Systems Conference and Exhibition. Volume 9, Tracks 9-11

    DTIC Science & Technology

    2005-08-04

    Walls ETL 1110-2-563, by John D. Clarkson and Robert C. Patev Belleville Locks & Dam Barge Accident on 6 Jan 05, by John Clarkson Portugues Dam Project...Update, by Alberto Gonzalez, Jim Mangold and Dave Dollar Portugues Dam: RCC Materials Investigation, by Jim Hinds Nonlinear Incremental Thermal Stress...Strain Analysis Portugues Dam, by David Dollar, Ahmed Nisar, Paul Jacob and Charles Logie Seismic Isolation of Mission-Critical Infrastructure to

  12. Application of wavelet analysis for monitoring the hydrologic effects of dam operation: Glen canyon dam and the Colorado River at lees ferry, Arizona

    USGS Publications Warehouse

    White, M.A.; Schmidt, J.C.; Topping, D.J.

    2005-01-01

    Wavelet analysis is a powerful tool with which to analyse the hydrologic effects of dam construction and operation on river systems. Using continuous records of instantaneous discharge from the Lees Ferry gauging station and records of daily mean discharge from upstream tributaries, we conducted wavelet analyses of the hydrologic structure of the Colorado River in Grand Canyon. The wavelet power spectrum (WPS) of daily mean discharge provided a highly compressed and integrative picture of the post-dam elimination of pronounced annual and sub-annual flow features. The WPS of the continuous record showed the influence of diurnal and weekly power generation cycles, shifts in discharge management, and the 1996 experimental flood in the post-dam period. Normalization of the WPS by local wavelet spectra revealed the fine structure of modulation in discharge scale and amplitude and provides an extremely efficient tool with which to assess the relationships among hydrologic cycles and ecological and geomorphic systems. We extended our analysis to sections of the Snake River and showed how wavelet analysis can be used as a data mining technique. The wavelet approach is an especially promising tool with which to assess dam operation in less well-studied regions and to evaluate management attempts to reconstruct desired flow characteristics. Copyright ?? 2005 John Wiley & Sons, Ltd.

  13. Influence of Partial Dam Removal on Change of Channel Morphology and Physical Habitats: A Case Study of Yu-Sheng River

    NASA Astrophysics Data System (ADS)

    Hao Weng, Chung; Yeh, Chao Hsien

    2017-04-01

    The rivers in Taiwan have the characteristic of large slope gradient and fast flow velocity caused by rugged terrain. And Taiwan often aces many typhoons which will bring large rainfall in the summer. In early Taiwan, river management was more focus on flood control, flood protection and disaster reduction. In recent years, the rise of ecological conservation awareness for the precious fish species brings spotlight on the Taiwan salmon (Oncorhynchus masou formosanus) which lives in the river section of this study. In order to make sure ecological corridor continuing, dam removal is the frequently discussed measure in recent years and its impact on environmental is also highly concerned. Since the dam removal may causes severe changes to the river channel, the action of dam removal needs careful evaluation. As one of the endangered species, Taiwan salmon is considered a national treasure of Taiwan and it was originally an offshore migration of the Pacific salmon. After the ice age and geographical isolation, it becomes as an unique subspecies of Taiwan and evolved into landlocked salmon. Now the Taiwan salmon habitats only exists in few upstream creeks and the total number of wild Taiwan salmon in 2015 was about 4,300. In order to expand the connectivity of the fish habitats in Chi-Jia-Wan creek basin, several dam removal projects had completed with good results. Therefore, this paper focuses on the dam removal of Yu-Sheng creek dam. In this paper, a digital elevation model (DEM) of about 1 kilometer channel of the Yu-Sheng creek dam is obtained by unmanned aerial vehicle (UAV). Using CCHE2D model, the simulation of dam removal will reveal the impact on channel morphology. After model parameter identification and verification, this study simulated the scenarios of three historical typhoon events with recurrence interval of two years, fifteen years, and three decades under four different patterns of dam removal to identify the the head erosion, flow pattern, and siltation and erosion of channel. With simulations by River2D under mean flow and ecological reference flow for the channels before and after dam removal, the habitat suitability curves of adult, two-aged juvenile, and one-aged juvenile salmons were applied to estimate the weighted usable areas. With results of two models on channel changes, infrastructure protection, and habitats improvement the best way for dam removal is then suggested.

  14. The effects of Medieval dams on genetic divergence and demographic history in brown trout populations

    PubMed Central

    2014-01-01

    Background Habitat fragmentation has accelerated within the last century, but may have been ongoing over longer time scales. We analyzed the timing and genetic consequences of fragmentation in two isolated lake-dwelling brown trout populations. They are from the same river system (the Gudenå River, Denmark) and have been isolated from downstream anadromous trout by dams established ca. 600–800 years ago. For reference, we included ten other anadromous populations and two hatchery strains. Based on analysis of 44 microsatellite loci we investigated if the lake populations have been naturally genetically differentiated from anadromous trout for thousands of years, or have diverged recently due to the establishment of dams. Results Divergence time estimates were based on 1) Approximate Bayesian Computation and 2) a coalescent-based isolation-with-gene-flow model. Both methods suggested divergence times ca. 600–800 years bp, providing strong evidence for establishment of dams in the Medieval as the factor causing divergence. Bayesian cluster analysis showed influence of stocked trout in several reference populations, but not in the focal lake and anadromous populations. Estimates of effective population size using a linkage disequilibrium method ranged from 244 to > 1,000 in all but one anadromous population, but were lower (153 and 252) in the lake populations. Conclusions We show that genetic divergence of lake-dwelling trout in two Danish lakes reflects establishment of water mills and impassable dams ca. 600–800 years ago rather than a natural genetic population structure. Although effective population sizes of the two lake populations are not critically low they may ultimately limit response to selection and thereby future adaptation. Our results demonstrate that populations may have been affected by anthropogenic disturbance over longer time scales than normally assumed. PMID:24903056

  15. The effects of Medieval dams on genetic divergence and demographic history in brown trout populations.

    PubMed

    Hansen, Michael M; Limborg, Morten T; Ferchaud, Anne-Laure; Pujolar, José-Martin

    2014-06-05

    Habitat fragmentation has accelerated within the last century, but may have been ongoing over longer time scales. We analyzed the timing and genetic consequences of fragmentation in two isolated lake-dwelling brown trout populations. They are from the same river system (the Gudenå River, Denmark) and have been isolated from downstream anadromous trout by dams established ca. 600-800 years ago. For reference, we included ten other anadromous populations and two hatchery strains. Based on analysis of 44 microsatellite loci we investigated if the lake populations have been naturally genetically differentiated from anadromous trout for thousands of years, or have diverged recently due to the establishment of dams. Divergence time estimates were based on 1) Approximate Bayesian Computation and 2) a coalescent-based isolation-with-gene-flow model. Both methods suggested divergence times ca. 600-800 years bp, providing strong evidence for establishment of dams in the Medieval as the factor causing divergence. Bayesian cluster analysis showed influence of stocked trout in several reference populations, but not in the focal lake and anadromous populations. Estimates of effective population size using a linkage disequilibrium method ranged from 244 to > 1,000 in all but one anadromous population, but were lower (153 and 252) in the lake populations. We show that genetic divergence of lake-dwelling trout in two Danish lakes reflects establishment of water mills and impassable dams ca. 600-800 years ago rather than a natural genetic population structure. Although effective population sizes of the two lake populations are not critically low they may ultimately limit response to selection and thereby future adaptation. Our results demonstrate that populations may have been affected by anthropogenic disturbance over longer time scales than normally assumed.

  16. Field verification of reconstructed dam-break flood, Laurel Run, Pennsylvania

    USGS Publications Warehouse

    Chen, Cheng-lung; Armbruster, Jeffrey T.

    1979-01-01

    A one-dimensional dam-break flood routing model is verified by using observed data on the flash flood resulting from the failure of Laurel Run Reservoir Dam near Johnstown, Pennsylvania. The model has been developed on the basis of an explicit scheme of the characteristics method with specified time intervals. The model combines one of the characteristic equations with the Rankine-Hugoniot shock equations to trace the corresponding characteristic backward to the known state for solving the depth and velocity of flow at the wave front. The previous version of the model has called for a modification of the method of solution to overcome the computational difficulty at the narrow breach and at any geomorphological constraints where channel geometry changes rapidly. The large reduction in the computational inaccuracies and oscillations was achieved by introducing the actual "storage width" in the equation of continuity and the imaginary "conveyance width" in the equation of motion. Close agreement between observed and computed peak stages at several stations downstream of the dam strongly suggests the validity and applicability of the model. However, small numerical noise appearing in the computed stage and discharge hydrographs at the dam site as well as discrepancy of attenuated peaks in the discharge hydrographs indicate the need for further model improvement.

  17. Hydrogeophysical investigations at Hidden Dam, Raymond, California

    USGS Publications Warehouse

    Minsley, Burke J.; Burton, Bethany L.; Ikard, Scott; Powers, Michael H.

    2011-01-01

    Self-potential and direct current resistivity surveys are carried out at the Hidden Dam site in Raymond, California to assess present-day seepage patterns and better understand the hydrogeologic mechanisms that likely influence seepage. Numerical modeling is utilized in conjunction with the geophysical measurements to predict variably-saturated flow through typical two-dimensional dam cross-sections as a function of reservoir elevation. Several different flow scenarios are investigated based on the known hydrogeology, as well as information about typical subsurface structures gained from the resistivity survey. The flow models are also used to simulate the bulk electrical resistivity in the subsurface under varying saturation conditions, as well as the self-potential response using petrophysical relationships and electrokinetic coupling equations.The self-potential survey consists of 512 measurements on the downstream area of the dam, and corroborates known seepage areas on the northwest side of the dam. Two direct-current resistivity profiles, each approximately 2,500 ft (762 m) long, indicate a broad sediment channel under the northwest side of the dam, which may be a significant seepage pathway through the foundation. A focusing of seepage in low-topography areas downstream of the dam is confirmed from the numerical flow simulations, which is also consistent with past observations. Little evidence of seepage is identified from the self-potential data on the southeast side of the dam, also consistent with historical records, though one possible area of focused seepage is identified near the outlet works. Integration of the geophysical surveys, numerical modeling, and observation well data provides a framework for better understanding seepage at the site through a combined hydrogeophysical approach.

  18. Maternal protein restriction during lactation induces early and lasting plasma metabolomic and hepatic lipidomic signatures of the offspring in a rodent programming model.

    PubMed

    Martin Agnoux, Aurore; El Ghaziri, Angélina; Moyon, Thomas; Pagniez, Anthony; David, Agnès; Simard, Gilles; Parnet, Patricia; Qannari, El Mostafa; Darmaun, Dominique; Antignac, Jean-Philippe; Alexandre-Gouabau, Marie-Cécile

    2018-05-01

    Perinatal undernutrition affects not only fetal and neonatal growth but also adult health outcome, as suggested by the metabolic imprinting concept. However, the exact mechanisms underlying offspring metabolic adaptations are not yet fully understood. Specifically, it remains unclear whether the gestation or the lactation is the more vulnerable period to modify offspring metabolic flexibility. We investigated in a rodent model of intrauterine growth restriction (IUGR) induced by maternal protein restriction (R) during gestation which time window of maternal undernutrition (gestation, lactation or gestation-lactation) has more impact on the male offspring metabolomics phenotype. Plasma metabolome and hepatic lipidome of offspring were characterized through suckling period and at adulthood using liquid chromatography-high-resolution mass spectrometry. Multivariate analysis of these fingerprints highlighted a persistent metabolomics signature in rats suckled by R dams, with a clear-cut discrimination from offspring fed by control (C) dams. Pups submitted to a nutritional switch at birth presented a metabolomics signature clearly distinct from that of pups nursed by dams maintained on a consistent perinatal diet. Control rats suckled by R dams presented transiently higher branched-chain amino acid (BCAA) oxidation during lactation besides increased fatty acid (FA) β-oxidation, associated with preserved insulin sensitivity and lesser fat accretion that persisted throughout their life. In contrast, IUGR rats displayed permanently impaired β-oxidation, associated to increased glucose or BCAA oxidation at adulthood, depending on the fact that pups experienced slow postnatal or catch-up growth, as suckled by R or C dams, respectively. Taken together, these findings provide evidence for a significant contribution of the lactation period in metabolic programming. Copyright © 2018 Elsevier Inc. All rights reserved.

  19. Deschutes estuary feasibility study: hydrodynamics and sediment transport modeling

    USGS Publications Warehouse

    George, Douglas A.; Gelfenbaum, Guy; Lesser, Giles; Stevens, Andrew W.

    2006-01-01

    - Provide the completed study to the CLAMP Steering Committee so that a recommendation about a long-term aquatic environment of the basin can be made. The hydrodynamic and sediment transport modeling task developed a number of different model simulations using a process-based morphological model, Delft3D, to help address these goals. Modeling results provide a qualitative assessment of estuarine behavior both prior to dam construction and after various post-dam removal scenarios. Quantitative data from the model is used in the companion biological assessment and engineering design components of the overall study. Overall, the modeling study found that after dam removal, tidal and estuarine processes are immediately restored, with marine water from Budd Inlet carried into North and Middle Basin on each rising tide and mud flats being exposed with each falling tide. Within the first year after dam removal, tidal processes, along with the occasional river floods, act to modify the estuary bed by redistributing sediment through erosion and deposition. The morphological response of the bed is rapid during the first couple of years, then slows as a dynamic equilibrium is reached within three to five years. By ten years after dam removal, the overall hydrodynamic and morphologic behavior of the estuary is similar to the pre-dam estuary, with the exception of South Basin, which has been permanently modified by human activities. In addition to a qualitative assessment of estuarine behavior, process-based modeling provides the ability address specific questions to help to inform decision-making. Considering that predicting future conditions of a complex estuarine environment is wrought with uncertainties, quantitative results in this report are often expressed in terms of ranges of possible outcomes.

  20. Channel response to sediment release: insights from a paired analysis of dam removal

    USGS Publications Warehouse

    Collins, Mathias J.; Snyder, Noah P.; Boardman, Graham; Banks, William S.; Andrews, Mary; Baker, Matthew E.; Conlon, Maricate; Gellis, Allen; McClain, Serena; Miller, Andrew; Wilcock, Peter

    2017-01-01

    Dam removals with unmanaged sediment releases are good opportunities to learn about channel response to abruptly increased bed material supply. Understanding these events is important because they affect aquatic habitats and human uses of floodplains. A longstanding paradigm in geomorphology holds that response rates to landscape disturbance exponentially decay through time. However, a previous study of the Merrimack Village Dam (MVD) removal on the Souhegan River in New Hampshire, USA, showed that an exponential function poorly described the early geomorphic response. Erosion of impounded sediments there was two-phased. We had an opportunity to quantitatively test the two-phase response model proposed for MVD by extending the record there and comparing it with data from the Simkins Dam removal on the Patapsco River in Maryland, USA. The watershed sizes are the same order of magnitude (102 km2), and at both sites low-head dams were removed (~3–4 m) and ~65 000 m3 of sand-sized sediments were discharged to low-gradient reaches. Analyzing four years of repeat morphometry and sediment surveys at the Simkins site, as well as continuous discharge and turbidity data, we observed the two-phase erosion response described for MVD. In the early phase, approximately 50% of the impounded sediment at Simkins was eroded rapidly during modest flows. After incision to base level and widening, a second phase began when further erosion depended on floods large enough to go over bank and access impounded sediments more distant from the newly-formed channel. Fitting functional forms to the data for both sites, we found that two-phase exponential models with changing decay constants fit the erosion data better than single-phase models. Valley width influences the two-phase erosion responses upstream, but downstream responses appear more closely related to local gradient, sediment re-supply from the upstream impoundments, and base flows.

  1. State-discharge relations at dams on the Illinois and Des Plaines rivers in Illinois

    USGS Publications Warehouse

    Mades, Dean M.

    1981-01-01

    Stage-discharge relations were developed for the Brandon Road Dam on the Des Plainse River and the Dresden Island, Marseilles, Starved Rock, Peoria, and La Grange Dams on the Illinois River. At Brandon Road Dam, streamflow is regulated by the operation of tainter gates and headgates. Tainter gates are operated to regulate streamflow at the Dresden Island, Marseilles, and Starved Rock Dams. Peoria Dam and La Grange Dam comprise timber Chanoine wickets which are lowered to a horizontal position on the streambed when used for streamflow regulation. Both dams have concrete abutments housing butterfly valves that are also used for regulation. A total of 50 discharge measurements ranging from 49.0 to 2,450 cubic meter per second were used to determine discharge coefficients in equations expressing discharge as a function of headwater depth, tailwater depth, and gate opening. A stage-discharge relation for Chanoine wicket dams developed from a U.S. Army Corps of Engineers hydraulic model study in 1937 and 1938 was verified with discharge measurements made downstream from the Peoria and La Grange Dams. (USGS)

  2. National Dam Inspection Program. Saxe Pond Dam (NDI I.D. Number PA-729, DER ID Number 8-10) Susquehanna River Basin. North Branch Mehoopany Creek, Bradford County, Pennsylvania. Phase I Inspection Report,

    DTIC Science & Technology

    1981-04-01

    presently utilized as a fishing camp. b. Location. -The dam is located approximately 2 miles northwest of the Village of Colley, Wilmot Township...1.3 Pertinent Data. a. Drainage Area. 3.13 square miles b. Discharge at Dam Site ( cfs ). Maximum flood at dam site Unknown Drainline capacity at normal...Overtopping Analysis. Complete summary sheets for the computer output are presented in Appendix D. Peak inflow (PMF) 11580 cfs Spillway capacity (recessed

  3. Estimation of natural historical flows for the Manitowish River near Manitowish Waters, Wisconsin

    USGS Publications Warehouse

    Juckem, Paul F.; Reneau, Paul C.; Robertson, Dale M.

    2012-01-01

    The Wisconsin Department of Natural Resources is charged with oversight of dam operations throughout Wisconsin and is considering modifications to the operating orders for the Rest Lake Dam in Vilas County, Wisconsin. State law requires that the operation orders be tied to natural low flows at the dam. Because the presence of the dam confounds measurement of natural flows, the U.S. Geological Survey, in cooperation with the Wisconsin Department of Natural Resources, installed streamflow-gaging stations and developed two statistical methods to improve estimates of natural flows at the Rest Lake Dam. Two independent methods were used to estimate daily natural flow for the Manitowish River approximately 1 mile downstream of the Rest Lake Dam. The first method was an adjusted drainage-area ratio method, which used a regression analysis that related measured water yield (flow divided by watershed area) from short-term (2009–11) gaging stations upstream of the Manitowish Chain of Lakes to the water yield from two nearby long-term gaging stations in order to extend the flow record (1991–2011). In this approach, the computed flows into the Chain of Lakes at the upstream gaging stations were multiplied by a coefficient to account for the monthly hydrologic contributions (precipitation, evaporation, groundwater, and runoff) associated with the additional watershed area between the upstream gaging stations and the dam at the outlet of the Chain of Lakes (Rest Lake Dam). The second method used to estimate daily natural flow at the Rest Lake Dam was a water-budget approach, which used lake stage and dam outflow data provided by the dam operator. A water-budget model was constructed and then calibrated with an automated parameter-estimation program by matching simulated flow-duration statistics with measured flow-duration statistics at the upstream gaging stations. After calibration of the water-budget model, the model was used to compute natural flow at the dam from 1973 to 2011. Daily natural flows at the dam, as computed by the adjusted drainage-area ratio method and the water-budget method, were used to compute monthly flow-duration values for the period of historical data available for each method. Monthly flow-durations provide a means for evaluating the frequency and range in flows that have been observed for each month over the course of many years. Both methods described the pattern and timing of measured high-flow and low-flow events at the upstream gaging stations. The adjusted drainage-area ratio method generally had smaller residual errors across the full range of observed flows and had smaller monthly biases than the water-budget method. Although it is not possible to evaluate which method may be more "correct" for estimating monthly natural flows at the dam, comparisons between the results of each method indicate that the adjusted drainage-area ratio method may be susceptible to biases at high flows due to isolated storms outside of the Manitowish River watershed. Conversely, it appears that the water-budget method may be susceptible to biases at low flows because of its sensitivity to the accuracy of reported lake stage and outflows, as well as effects of upstream diversions that could not be fully compensated for with this method. Results from both methods are useful for understanding the natural flow patterns at the dam. Flows for both methods have similar patterns, with high median flows in spring and low median flows in late summer. Similarly, the range from monthly high-flow durations to low-flow durations increases during spring, decreases during summer, and increases again during fall. These seasonal patterns illustrate a challenge with interpreting a single value of natural low flow. That is, a natural low flow computed for September is not representative of a natural low flow in April. Moreover, alteration of natural flows caused by storing water in the Chain of Lakes during spring and releasing it in fall causes a change in the timing of high and low flows compared with natural conditions. That is, the lowest reported dam outflows occurred in spring and highest reported outflows occurred in fall, which is opposite the natural patterns.

  4. 2005 Tri-Service Infrastructure Systems Conference and Exhibition. Volume 11, Tracks 13 and 14

    DTIC Science & Technology

    2005-08-04

    Walls ETL 1110-2-563, by John D. Clarkson and Robert C. Patev Belleville Locks & Dam Barge Accident on 6 Jan 05, by John Clarkson Portugues Dam Project...Update, by Alberto Gonzalez, Jim Mangold and Dave Dollar Portugues Dam: RCC Materials Investigation, by Jim Hinds Nonlinear Incremental Thermal Stress...Strain Analysis Portugues Dam, by David Dollar, Ahmed Nisar, Paul Jacob and Charles Logie Seismic Isolation of Mission-Critical Infrastructure to

  5. Risk Costs for New Dams: Economic Analysis and Effects of Monitoring

    NASA Astrophysics Data System (ADS)

    Paté-Cornell, M. Elisabeth; Tagaras, George

    1986-01-01

    This paper presents new developments and illustrations of the introduction of risk and costs in cost-benefit analysis for new dams. The emphasis is on a method of evaluation of the risk costs based on the structure of the local economy. Costs to agricultural property as well as residential, commercial, industrial, and public property are studied in detail. Of particular interest is the case of sequential dam failure and the evaluation of the risk costs attributable to a new dam upstream from an existing one. Three real cases are presented as illustrations of the method: the Auburn Dam, the Dickey-Lincoln School Project, and the Teton Dam, which failed in 1976. This last case provides a calibration tool for the estimation of loss ratios. For these three projects, the risk-modified benefit-cost ratios are computed to assess the effect of the risk on the economic performance of the project. The role of a warning system provided by systematic monitoring of the dam is analyzed: by reducing the risk costs, the warning system attenuates their effect on the benefit-cost ratio. The precursors, however, can be missed or misinterpreted: monitoring does not guarantee that the risks to human life can be reduced to zero. This study shows, in particular, that it is critical to consider the risk costs in the decision to build a new dam when the flood area is large and densely populated.

  6. Spatial Multicriteria Decision Analysis of Flood Risks in Aging-Dam Management in China: A Framework and Case Study

    PubMed Central

    Yang, Meng; Qian, Xin; Zhang, Yuchao; Sheng, Jinbao; Shen, Dengle; Ge, Yi

    2011-01-01

    Approximately 30,000 dams in China are aging and are considered to be high-level risks. Developing a framework for analyzing spatial multicriteria flood risk is crucial to ranking management scenarios for these dams, especially in densely populated areas. Based on the theories of spatial multicriteria decision analysis, this report generalizes a framework consisting of scenario definition, problem structuring, criteria construction, spatial quantification of criteria, criteria weighting, decision rules, sensitivity analyses, and scenario appraisal. The framework is presented in detail by using a case study to rank dam rehabilitation, decommissioning and existing-condition scenarios. The results show that there was a serious inundation, and that a dam rehabilitation scenario could reduce the multicriteria flood risk by 0.25 in the most affected areas; this indicates a mean risk decrease of less than 23%. Although increased risk (<0.20) was found for some residential and commercial buildings, if the dam were to be decommissioned, the mean risk would not be greater than the current existing risk, indicating that the dam rehabilitation scenario had a higher rank for decreasing the flood risk than the decommissioning scenario, but that dam rehabilitation alone might be of little help in abating flood risk. With adjustments and improvement to the specific methods (according to the circumstances and available data) this framework may be applied to other sites. PMID:21655125

  7. Applying the World Water and Agriculture Model to Filling Scenarios for the Grand Ethiopian Renaissance Dam

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Villa, Daniel L.; Tidwell, Vincent C.; Passell, Howard D.

    The World Water and Agriculture Model has been used to simulate water, hydropower, and food sector effects in Egypt, Sudan, and Ethiopia during the filling of the Grand Ethiopian Renaissance Dam reservoir. This unique capability allows tradeoffs to be made between filling policies for the Grand Ethiopian Renaissance Dam reservoir. This Nile River Basin study is presented to illustrate the capacity to use the World Water and Agriculture Model to simulate regional food security issues while keeping a global perspective. The study uses runoff data from the Intergovernmental Panel for Climate Change Coupled Model Inter-comparison Project Phase 5 and informationmore » from the literature in order to establish a reasonable set of hydrological initial conditions. Gross Domestic Product and population growth are modelled exogenously based on a composite projection of United Nations and World Bank data. The effects of the Grand Ethiopian Renaissance Dam under various percentages of water withheld are presented.« less

  8. Geo-environmental Study to Identify the Affecting Factors on Dohuk's Dam and the city (Northren Iraq) by Use Remote Sensing Techniques

    NASA Astrophysics Data System (ADS)

    Hamdon, Alaa

    2010-05-01

    The Dohuk's dam is one of the most important Aggregated dams in Iraq, located about 1 km from Dohuk city in northern Iraq, So; this vital project provides Dohuk city by water while the city formerly dependent on wells water prior to the establishing of the dam, and this is one of the main reasons for land-use expansion in Dohuk city and its vicinity,which is meant that the Dohuk's dam safety factor ,it is the key of the city safety factor .This dam has initiated the establishment of the dam in 1980 and was established in 1988, and it's capacity is 47.5 million cubic meters. This study aims to analyze the morphometric or geometric properties and the environmental factors at drainage systems and drainage network for Dohuk area's drainage basins (which recharges water of Dohuk Dam's Lake and it is accumulated by rainfall and spring water) scientifically and geometrically. Study of the geology of construction area of the dam Structuraly and tectonically. Satellite image, topographic maps and aerial photographs used in this study for merging its results together and preparing a drainage basin's maps and a geologic interpretation map for the study area to recognize the important geologic impact on the river which comes out from dam lake, also some of the field work investigation has been depended in this study. As a final result from morphometric analysis of drainage basins, tectonic analysis and geological investigations for study area, found as the following: 1 - Determining the amount of the accumulated sediments on the dam body, which has been carried by the collected rain-full water from the drainage basins, snow and spring water (the resources of Dam Lake). Study of the impact of these deposits on dam stability and evaluate the risk of these deposits on dam body and on its safety. 2 - Identification of geological features, which are that threaten the safety of the river of city which concern the only resource for the city and stability of dam body and its related to other geological phenomena (such as earthquakes and floods ... etc.). 3 - Suggestions some of the proposals for the maintenance of the dam lake to preserve the stability of the dam body and to protect the river properties. 4- Prepare some scientific criteria to avoid a disaster affecting human activity or agricultural or industrial, which are located in the city of Dohuk.

  9. Method of Evaluating the Life Cycle Cost of Small Earth Dams Considering the Risk of Heavy Rainfall and Selection Method of the Optimum Countermeasure

    NASA Astrophysics Data System (ADS)

    Hori, Toshikazu; Mohri, Yoshiyuki; Matsushima, Kenichi; Ariyoshi, Mitsuru

    In recent years the increase in the number of heavy rainfall occurrences such as through unpredictable cloudbursts have resulted in the safety of the embankments of small earth dams needing to be improved. However, the severe financial condition of the government and local autonomous bodies necessitate the cost of improving them to be reduced. This study concerns the development of a method of evaluating the life cycle cost of small earth dams considered to pose a risk and in order to improve the safety of the downstream areas of small earth dams at minimal cost. Use of a safety evaluation method that is based on a combination of runoff analysis, saturated and unsaturated seepage analysis, and slope stability analysis enables the probability of a dam breach and its life cycle cost with the risk of heavy rainfall taken into account to be calculated. Moreover, use of the life cycle cost evaluation method will lead to the development of a technique for selecting the method of the optimal improvement or countermeasures against heavy rainfall.

  10. Geomorphic and Ecological Issues in Removal of Sediment-Filled Dams in the California Coast Ranges (Invited)

    NASA Astrophysics Data System (ADS)

    Kondolf, G. M.; Oreilly, C.

    2010-12-01

    Water-supply reservoirs in the actively eroding California Coast Ranges are vulnerable to sediment filling, thus creating obsolete impounding dams (Minear & Kondolf 2009). Once full of sediment, there is more impetus to remove dams for public safety and fish passage, but managing accumulated sediments becomes a dominant issue in dam removal planning. We analyzed the planning process and sediment management analyses for five dams, all of which have important ecological resources but whose dam removal options are constrained by potential impacts to downstream urban populations. Ringe Dam on Malibu Ck, Matilija Dam on the Ventura River, Searsville Dam on San Francisquito Ck, and Upper York Creek Dam on York Ck cut off important habitat for anadromous steelhead trout (Oncorhynchus mykiss). San Clemente Dam on the Carmel River has a working fish ladder, but only some of the migratory steelhead use it. By virtue of having filled with sediment, all five dams are at greater risk of seismic failure. San Clemente Dam is at greater risk because its foundation is on alluvium (not bedrock), and the poor-quality concrete in Matilija Dam is deteriorating from an akali-aggregate reaction. Simply removing the dams and allowing accumulated sediments to be transported downstream is not an option because all these rivers have extremely expensive houses along downstream banks and floodplains, so that allowing the downstream channel to aggrade with dam-dervied sediments could expose agencies to liability for future flood losses. Analyses of potential sediment transport have been based mostly on application of tractive force models, and have supported management responses ranging from in-situ stabilization (San Clemente and Matilija) to removal of stored sediment (York) to annual dredging to maintain capacity and prevent sediment passing over the dam (proposed for Searsville).

  11. Dams and transnational advocacy: Political opportunities in transnational collective action

    NASA Astrophysics Data System (ADS)

    Fu, Teng

    Possible arguments to explain the gradual decline in big dam development and its site transferring from developed to developing countries include technical, economic, and political factors. This study focuses on the political argument---the rise of transnational anti-dam advocacy and its impact on state policy-making. Under what conditions does transnational anti-dam advocacy matter? Under what conditions does transnational advocacy change state dam policies (delay, scale down, or cancel)? It examines the role of transnational anti-dam actors in big dam building in a comparative context in Asia. Applying the social movement theory of political opportunity structure (POS) and using the qualitative case-study method, the study provides both within-case and cross-case analyses. Within-case analysis is utilized to explain the changing dynamics of big dam building in China (Three Gorges Dam and proposed Nu/Salween River dam projects), and to a lesser extent, Sardar Sarovar Project in India and Nam Theun 2 Dam in Laos. Different domestic and international POS (DPOS and IPOS) impact the strategies and outcomes of anti-dam advocacies in these countries. The degree of openness of the POS directly affects the capacity of transnational efforts in influencing state dam policies. The degree of openness or closure is measured by specific laws, institutions, discourse, or elite allies (or the absence of these) for the participation of non-state actors on big dam issues at a particular moment. This degree of openness is relative, varying over time, across countries and regions. This study finds that the impact of transnational anti-dam activism is most effective when both DPOS and IPOS are relatively open. Transnational anti-dam advocacy is least effective in influencing state dam policies when both DPOS and IPOS are relatively closed. Under a relatively open DPOS and closed IPOS, transnational anti-dam advocacy is more likely to successfully change state dam policies and even facilitate the opening of relatively closed IPOS. In contrast, under a relatively closed DPOS and open IPOS, transnational anti-dam advocacy can hardly exist. Without the domestic anti-dam pressure from below, international anti-dam efforts from above are less likely to affect state dam policies or open up closed DPOS.

  12. Accident study of torrential protective structures based on the French RTM database

    NASA Astrophysics Data System (ADS)

    Boncompain, Ingrid; Quefféléan, Yann; Carladous, Simon

    2017-04-01

    Torrential protective structures such as dikes, sediment traps, and check dams aim to reduce damage on elements at risk. They are built given a reference scenario. Nevertheless, this scenario can be exceeded or structures can fail because of their design or their ageing. We later talk about "accidents". The 1996 Aras disaster near Biescas (Spain) showed that consequences can be significant: 35 of 40 check dams were destroyed which involved 87 fatalities in a campsite. The accident probability and its consequences must be taken into account to analyze risk. Databases are useful tools to extract needed information. In France, the Restoration of Mountainous Areas department (RTM) has been public funded to develop a database, specific to mountainous areas (the Alps and the Pyrenees). Almost 12 500 check dams, 80 sediment traps and 600 dikes were registered in public forests in 2011. These samples were assumed significant for check dams and sediment traps but not for dikes because the most part was missing. In parallel, more than 31 000 torrential events were registered. Given these elements, an accident study was developed. We first extracted 1 925 events with accidents on protective structures: 39 % occurred during the 19th century and 53 % have occurred since 1900. Sediment traps were involved in 37 events, check dams in 336, and dikes in 1488. Then, a detailed analysis was specifically carried out for check dams. Event phenomena were extracted: torrential flood, liquid flood, snow avalanche, rock fall, and landslide. Accident typology was also specified: scouring, breaking of several check dams, total or partial destruction of one structure, overflowing. Causes of accidents on check dams were first analyzed. Torrential floods were responsible of 85 % of events (284 of 336) even if other phenomena must be also taken into account. Almost 45 % of events (152 of 336) involved total destruction of one or several check dams. Taking into account events for the last 150 years, 30 events were registered with destruction of several check dams: the annual probability of occurrence is 3.10-4. Analyzing consequences, only 11 of previously retained events (1925) were registered with fatalities. Finally, these quantitative elements were compared to qualitative feedback analysis from field practitioners and were illustrated with the 1987 Saint-Antoine event, in Modane. The total or partial destruction of 25 check dams released between 20 000 and 30 000 m3, which was one third of the estimated debris flow volume (85 000 m3) which damaged an industrial area. The lack of their maintenance partially explained this accident. As a conclusion, we must keep in mind that these results are limited to available data (all events have not been necessarily reported). Accidents on check dams are rare according to these data. It can be due to their general maintenance. This first analysis could be improved taking into account expert analysis, completing with information from other countries databases and formalizing the approach through a dependability analysis framework.

  13. Principles of health economic evaluations of lipid-lowering strategies.

    PubMed

    Ara, Roberta; Basarir, Hasan; Ward, Sue Elizabeth

    2012-08-01

    Policy decision-making in cardiovascular disease is increasingly informed by the results generated from decision-analytic models (DAMs). The methodological approaches and assumptions used in these DAMs impact on the results generated and can influence a policy decision based on a cost per quality-adjusted life year (QALY) threshold. Decision makers need to be provided with a clear understanding of the key sources of evidence and how they are used in the DAM to make an informed judgement on the quality and appropriateness of the results generated. Our review identified 12 studies exploring the cost-effectiveness of pharmaceutical lipid-lowering interventions published since January 2010. All studies used Markov models with annual cycles to represent the long-term clinical pathway. Important differences in the model structures and evidence base used within the DAMs were identified. Whereas the reporting standards were reasonably good, there were many instances when reporting of methods could be improved, particularly relating to baseline risk levels, long-term benefit of treatment and health state utility values. There is a scope for improvement in the reporting of evidence and modelling approaches used within DAMs to provide decision makers with a clearer understanding of the quality and validity of the results generated. This would be assisted by fuller publication of models, perhaps through detailed web appendices.

  14. Dental Assistant, Advanced. Revision

    DTIC Science & Technology

    1989-02-01

    compound , or model- ing plaster instead of the rubber dam retainer Removing the Rubber Dam (figures 4-4 and 4-5). A ligature can also be used After the...roots or split crowns. If a is checked. When directed by the dental officer, ligature, dental compound , or modeling plaster remove the rubber dam...34clean" and 1 " dirty " JOB STEPS 1. Wash hands. 2. Recor! patient’s name. 3. Explain procedure to patient. 4. Tell patient to lie in bed or be seated

  15. Assessing the impacts of dams and levees on the hydrologic record of the Middle and Lower Mississippi River, USA

    USGS Publications Warehouse

    Remo, Jonathan W.F.; Ickes, Brian; Ryherd, Julia K.; Guida, Ross J.; Therrell, Matthew D.

    2018-01-01

    The impacts of dams and levees on the long-term (>130 years) discharge record was assessed along a ~1200 km segment of the Mississippi River between St. Louis, Missouri, and Vicksburg, Mississippi. To aid in our evaluation of dam impacts, we used data from the U.S. National Inventory of Dams to calculate the rate of reservoir expansion at five long-term hydrologic monitoring stations along the study segment. We divided the hydrologic record at each station into three periods: (1) a pre-rapid reservoir expansion period; (2) a rapid reservoir expansion period; and (3) a post-rapid reservoir expansion period. We then used three approaches to assess changes in the hydrologic record at each station. Indicators of hydrologic alteration (IHA) and flow duration hydrographs were used to quantify changes in flow conditions between the pre- and post-rapid reservoir expansion periods. Auto-regressive interrupted time series analysis (ARITS) was used to assess trends in maximum annual discharge, mean annual discharge, minimum annual discharge, and standard deviation of daily discharges within a given water year. A one-dimensional HEC-RAS hydraulic model was used to assess the impact of levees on flood flows. Our results revealed that minimum annual discharges and low-flow IHA parameters showed the most significant changes. Additionally, increasing trends in minimum annual discharge during the rapid reservoir expansion period were found at three out of the five hydrologic monitoring stations. These IHA and ARITS results support previous findings consistent with the observation that reservoirs generally have the greatest impacts on low-flow conditions. River segment scale hydraulic modeling revealed levees can modestly increase peak flood discharges, while basin-scale hydrologic modeling assessments by the U.S. Army Corps of Engineers showed that tributary reservoirs reduced peak discharges by a similar magnitude (2 to 30%). This finding suggests that the effects of dams and levees on peak flood discharges are in part offsetting one another along the modeled river segments and likely other substantially leveed segments of the Mississippi River.

  16. Assessing the impacts of dams and levees on the hydrologic record of the Middle and Lower Mississippi River, USA

    NASA Astrophysics Data System (ADS)

    Remo, Jonathan W. F.; Ickes, Brian S.; Ryherd, Julia K.; Guida, Ross J.; Therrell, Matthew D.

    2018-07-01

    The impacts of dams and levees on the long-term (>130 years) discharge record was assessed along a 1200 km segment of the Mississippi River between St. Louis, Missouri, and Vicksburg, Mississippi. To aid in our evaluation of dam impacts, we used data from the U.S. National Inventory of Dams to calculate the rate of reservoir expansion at five long-term hydrologic monitoring stations along the study segment. We divided the hydrologic record at each station into three periods: (1) a pre-rapid reservoir expansion period; (2) a rapid reservoir expansion period; and (3) a post-rapid reservoir expansion period. We then used three approaches to assess changes in the hydrologic record at each station. Indicators of hydrologic alteration (IHA) and flow duration hydrographs were used to quantify changes in flow conditions between the pre- and post-rapid reservoir expansion periods. Auto-regressive interrupted time series analysis (ARITS) was used to assess trends in maximum annual discharge, mean annual discharge, minimum annual discharge, and standard deviation of daily discharges within a given water year. A one-dimensional HEC-RAS hydraulic model was used to assess the impact of levees on flood flows. Our results revealed that minimum annual discharges and low-flow IHA parameters showed the most significant changes. Additionally, increasing trends in minimum annual discharge during the rapid reservoir expansion period were found at three out of the five hydrologic monitoring stations. These IHA and ARITS results support previous findings consistent with the observation that reservoirs generally have the greatest impacts on low-flow conditions. River segment scale hydraulic modeling revealed levees can modestly increase peak flood discharges, while basin-scale hydrologic modeling assessments by the U.S. Army Corps of Engineers showed that tributary reservoirs reduced peak discharges by a similar magnitude (2 to 30%). This finding suggests that the effects of dams and levees on peak flood discharges are in part offsetting one another along the modeled river segments and likely other substantially leveed segments of the Mississippi River.

  17. Variability of Ecosystem State in Rivers Containing Natural Dams: A Chemical Analysis

    NASA Astrophysics Data System (ADS)

    Reynolds, Z. A.

    2015-12-01

    Flooding, and the resulting economic damage to roads and property, is associated with natural dams such as beaver dams or log jams. For this reason, humans often remove natural dams; however, river reaches with natural dams provide very different ecosystem services in comparison with free-flowing river reaches. Therefore, the goal of this project is to assess the differences in ecosystem state between these different river reach types in the northeastern United States. We focused on differences in basic chemistry (e.g., dissolved oxygen, pH, temperature, and organic carbon) to assess the impact of natural dams on river ecosystem state. Study sites include rivers in the White Mountains and southeastern New Hampshire at locations with beaver dams, beaver ponds, beaver meadows, log jams, and free-flowing reaches. Dissolved oxygen, ORP, pH, temperature, and conductivity were measured in the field with a YSI Professional Plus meter. Water samples were collected for subsequent laboratory analysis of total organic carbon with a Shimadzu TOC-L. Preliminary results show that the chemistry of river water varies with feature type. Most significantly, dissolved oxygen concentrations are highest in free-flowing reaches and lowest in beaver ponds. Although beaver ponds are often associated with lower pH, due the increased concentration of organic acids, some beaver ponds can increase pH when compared to free-flowing reaches on the same river. Early results also show that water chemistry returns quickly to the chemistry typical of the free-flowing river reaches after being altered by a natural dam. Overall, natural dams create a river system that has more heterogeneity, and therefore has opportunities to provide more ecosystem functions, than a purely free-flowing river; this can increase the number of supported instream and riparian species. By increasing the understanding of how natural dams affect the chemistry of river water, river engineers can improve their decisions on how to remove problematic natural dams that increase flooding risks; they can also investigate possibilities to mimic the ecosystem state generated by natural dams in places where these dams are regularly removed.

  18. A multi-year analysis of spillway survival for juvenile salmonids as a function of spill bay operations at McNary Dam, Washington and Oregon, 2004-09

    USGS Publications Warehouse

    Adams, Noah S.; Hansel, Hal C.; Perry, Russell W.; Evans, Scott D.

    2012-01-01

    We analyzed 6 years (2004-09) of passage and survival data collected at McNary Dam to examine how spill bay operations affect survival of juvenile salmonids passing through the spillway at McNary Dam. We also examined the relations between spill bay operations and survival through the juvenile fish bypass in an attempt to determine if survival through the bypass is influenced by spill bay operations. We used a Cormack-Jolly-Seber release-recapture model (CJS model) to determine how the survival of juvenile salmonids passing through McNary Dam relates to spill bay operations. Results of these analyses, while not designed to yield predictive models, can be used to help develop dam-operation strategies that optimize juvenile salmonid survival. For example, increasing total discharge typically had a positive effect on both spillway and bypass survival for all species except sockeye salmon (Oncorhynchus nerka). Likewise, an increase in spill bay discharge improved spillway survival for yearling Chinook salmon (Oncorhynchus tshawytscha), and an increase in spillway discharge positively affected spillway survival for juvenile steelhead (Oncorhynchus mykiss). The strong linear relation between increased spill and increased survival indicates that increasing the amount of water through the spillway is one strategy that could be used to improve spillway survival for yearling Chinook salmon and juvenile steelhead. However, increased spill did not improve spillway survival for subyearling Chinook salmon and sockeye salmon. Our results indicate that a uniform spill pattern would provide the highest spillway survival and bypass survival for subyearling Chinook salmon. Conversely, a predominantly south spill pattern provided the highest spillway survival for yearling Chinook salmon and juvenile steelhead. Although spill pattern was not a factor for spillway survival of sockeye salmon, spill bay operations that optimize passage through the north and south spill bays maximized spillway survival for this species. Bypass survival of yearling Chinook salmon could be improved by optimizing conditions to facilitate bypass passage at night, but the method to do so is not apparent from this analysis because photoperiod was the only factor affecting bypass survival based on the best and only supported model. Bypass survival of juvenile steelhead would benefit from lower water temperatures and increased total and spillway discharge. Likewise, subyearling Chinook salmon bypass survival would improve with lower water temperatures, increased total discharge, and a uniform spill pattern.

  19. Development of CE-QUAL-W2 models for the Middle Fork Willamette and South Santiam Rivers, Oregon

    USGS Publications Warehouse

    Buccola, Norman L.; Stonewall, Adam J.; Sullivan, Annett B.; Kim, Yoonhee; Rounds, Stewart A.

    2013-01-01

    Hydrodynamic (CE-QUAL-W2) models of Hills Creek Lake (HCL), Lookout Point Lake (LOP), and Dexter Lake (DEX) on the Middle Fork Willamette River (MFWR), and models of Green Peter Lake and Foster Lake on the South Santiam River systems in western Oregon were updated and recalibrated for a wide range of flow and meteorological conditions. These CE-QUAL-W2 models originally were developed by West Consultants, Inc., for the U.S. Army Corps of Engineers. This study by the U.S. Geological Survey included a reassessment of the models’ calibration in more recent years—2002, 2006, 2008, and 2011—categorized respectively as low, normal, high, and extremely high flow calendar years. These years incorporated current dam-operation practices and more available data than the time period used in the original calibration. Modeled water temperatures downstream of both HCL and LOP-DEX on the MFWR were within an average of 0.68 degree Celsius (°C) of measured values; modeled temperatures downstream of Foster Dam on the South Santiam River were within an average of 0.65°C of measured values. A new CE-QUAL-W2 model was developed and calibrated for the riverine MFWR reach between Hills Creek Dam and the head of LOP, allowing an evaluation of the flow and temperature conditions in the entire MFWR system from HCL to Dexter Dam. The complex bathymetry and long residence time of HCL, combined with the relatively deep location of the power and regulating outlet structures at Hills Creek Dam, led to a HCL model that was highly sensitive to several outlet and geometric parameters related to dam structures (STR TOP, STR BOT, STR WIDTH). Release temperatures from HCL were important and often persisted downstream as they were incorporated in the MFWR model and the LOP-DEX model (downstream of MFWR). The models tended to underpredict the measured temperature of water releases from Dexter Dam during the late-September-through-December drawdown period in 2002, and again (to a lesser extent) in 2011, but simulations were much more accurate in 2006 and 2008. This episodic model bias may have been a result of hot, dry conditions; lower lake elevations; and earlier drawdown at both HCL and LOP in 2002. These dry conditions in 2002 may have contradicted assumptions inherent in the estimation of certain model inputs, such as unmeasured inflows and water temperatures, which may respond differently during dry years than during normal and wet years. This report documents the development and calibration of new and revised flow and water-temperature models for riverine and reservoir reaches in the Middle Fork Willamette River and South Santiam River systems. Methods and model parameter values were established for the accurate simulation of flows and temperatures in these systems under current conditions. By extension, these models should be able to accurately simulate flows and temperatures under potential future conditions in which dam operations and dam outlet structures may be changed as part of a strategy to improve habitat, fish passage, and temperature conditions for endangered fish.

  20. Evaluation of the Pseudostatic Analyses of Earth Dams Using FE Simulation and Observed Earthquake-Induced Deformations: Case Studies of Upper San Fernando and Kitayama Dams

    PubMed Central

    Akhlaghi, Tohid

    2014-01-01

    Evaluation of the accuracy of the pseudostatic approach is governed by the accuracy with which the simple pseudostatic inertial forces represent the complex dynamic inertial forces that actually exist in an earthquake. In this study, the Upper San Fernando and Kitayama earth dams, which have been designed using the pseudostatic approach and damaged during the 1971 San Fernando and 1995 Kobe earthquakes, were investigated and analyzed. The finite element models of the dams were prepared based on the detailed available data and results of in situ and laboratory material tests. Dynamic analyses were conducted to simulate the earthquake-induced deformations of the dams using the computer program Plaxis code. Then the pseudostatic seismic coefficient used in the design and analyses of the dams were compared with the seismic coefficients obtained from dynamic analyses of the simulated model as well as the other available proposed pseudostatic correlations. Based on the comparisons made, the accuracy and reliability of the pseudostatic seismic coefficients are evaluated and discussed. PMID:24616636

  1. Forecasting the remaining reservoir capacity in the Laurentian Great Lakes watershed

    NASA Astrophysics Data System (ADS)

    Alighalehbabakhani, Fatemeh; Miller, Carol J.; Baskaran, Mark; Selegean, James P.; Barkach, John H.; Dahl, Travis; Abkenar, Seyed Mohsen Sadatiyan

    2017-12-01

    Sediment accumulation behind a dam is a significant factor in reservoir operation and watershed management. There are many dams located within the Laurentian Great Lakes watershed whose operations have been adversely affected by excessive reservoir sedimentation. Reservoir sedimentation effects include reduction of flood control capability and limitations to both water supply withdrawals and power generation due to reduced reservoir storage. In this research, the sediment accumulation rates of twelve reservoirs within the Great Lakes watershed were evaluated using the Soil and Water Assessment Tool (SWAT). The estimated sediment accumulation rates by SWAT were compared to estimates relying on radionuclide dating of sediment cores and bathymetric survey methods. Based on the sediment accumulation rate, the remaining reservoir capacity for each study site was estimated. Evaluation of the anthropogenic impacts including land use change and dam construction on the sediment yield were assessed in this research. The regression analysis was done on the current and pre-European settlement sediment yield for the modeled watersheds to predict the current and natural sediment yield in un-modeled watersheds. These eleven watersheds are in the state of Indiana, Michigan, Ohio, New York, and Wisconsin.

  2. A physically-based method for predicting peak discharge of floods caused by failure of natural and constructed earthen dams

    USGS Publications Warehouse

    Walder, J.S.

    1997-01-01

    We analyse a simple, physically-based model of breach formation in natural and constructed earthen dams to elucidate the principal factors controlling the flood hydrograph at the breach. Formation of the breach, which is assumed trapezoidal in cross-section, is parameterized by the mean rate of downcutting, k, the value of which is constrained by observations. A dimensionless formulation of the model leads to the prediction that the breach hydrograph depends upon lake shape, the ratio r of breach width to depth, the side slope ?? of the breach, and the parameter ?? = (V/ D3)(k/???gD), where V = lake volume, D = lake depth, and g is the acceleration due to gravity. Calculations show that peak discharge Qp depends weakly on lake shape r and ??, but strongly on ??, which is the product of a dimensionless lake volume and a dimensionless erosion rate. Qp(??) takes asymptotically distinct forms depending on whether ?? > 1. Theoretical predictions agree well with data from dam failures for which k could be reasonably estimated. The analysis provides a rapid and in many cases graphical way to estimate plausible values of Qp at the breach.

  3. Historical and simulated changes in channel characteristics of the Kalamazoo River, Plainwell to Otesgo, Michigan

    USGS Publications Warehouse

    Rachol, Cynthia M.; Fitzpatrick, Faith A.; Rossi, Tiffiny

    2005-01-01

    In a study to understand the historical effects of the construction and decommissioning of dams on the Kalamazoo River, Plainwell to Otesgo, Michigan, and to simulate channel changes that may result if the dams were removed, early to mid-1800s General Land Office surveys and aerial photographs from 1938, 1981, and 1999 were compared in order to identify historical changes in the river’s planform. This analysis of the 80-mile reach from Morrow Dam to the river mouth at Saugatuck provided insight into how susceptible the river has been to channel migration. The comparison showed that changes in channel width and location were caused mainly by construction of dams and subsequent water-level adjustments in the impounded reaches upstream from the dams. Braiding also occurred downstream from one of the dams. Minor changes in channel form that were not caused by the dams, such as the development and cutoff of meander bends, were observed. A more detailed study in a 5-mile reach passing through the Plainwell and Otsego City Dams included compiling existing valley cross section and longitudinal profile data into a database, assessing bank stability, and using a hydrologic model to simulate the channel as if the dams were removed. Fifty-four valley cross sections compiled from United States Geological Survey and consultant data sets were used as a base for a bank-stability assessment and to design a hypothetical stable channel without the two dams. The channel design involved adjusting the slope, hydraulic geometry, and floodplain width to ensure that water could be transferred through the reach without increasing flooding or erosion problems. The bank-stability assessment focused on conditions that are critical to failure. This was accomplished through the use of a two step process. The first involved evaluating the sediment removed from the bank toe when the stage is high. The second involved calculating the factor of safety for the bank based on the water table being elevated higher than the stage, mimicing a bank storage effect. Using these paired proccesses, two scenarios of critical conditions were evaluated: dams present and dams removed. Results of the bank assessments showed that, under both critical-condition scenarios, the streambanks were more susceptible to toe erosion than to block failure. As toe erosion progresses, the banks will eventually collapse as supporting material underneath is removed. Toe erosion for the damsremoved scenario resulted in higher amounts of erosion than for the dams-present scenario, leading to an overall decrease in bank stability. Effects of vegetation on the bank stability were variable; stability for some banks increase if vegetation was present but remain the same for other banks.

  4. Hydraulic alterations resulting from hydropower development in the Bonneville Reach of the Columbia River

    USGS Publications Warehouse

    Hatten, James R.; Batt, Thomas R.

    2010-01-01

    We used a two-dimensional (2D) hydrodynamic model to simulate and compare the hydraulic characteristics in a 74-km reach of the Columbia River (the Bonneville Reach) before and after construction of Bonneville Dam. For hydrodynamic modeling, we created a bathymetric layer of the Bonneville Reach from single-beam and multi-beam echo-sounder surveys, digital elevation models, and navigation surveys. We calibrated the hydrodynamic model at 100 and 300 kcfs with a user-defined roughness layer, a variable-sized mesh, and a U.S. Army Corps of Engineers backwater curve. We verified the 2D model with acoustic Doppler current profiler (ADCP) data at 14 transects and three flows. The 2D model was 88% accurate for water depths, and 77% accurate for velocities. We verified a pre-dam 2D model run at 126 kcfs using pre-dam aerial photos from September 1935. Hydraulic simulations indicated that mean water depths in the Bonneville Reach increased by 34% following dam construction, while mean velocities decreased by 58%. There are numerous activities that would benefit from data output from the 2D model, including biological sampling, bioenergetics, and spatially explicit habitat modeling.

  5. The changing hydrology of a dammed Amazon

    PubMed Central

    Timpe, Kelsie; Kaplan, David

    2017-01-01

    Developing countries around the world are expanding hydropower to meet growing energy demand. In the Brazilian Amazon, >200 dams are planned over the next 30 years, and questions about the impacts of current and future hydropower in this globally important watershed remain unanswered. In this context, we applied a hydrologic indicator method to quantify how existing Amazon dams have altered the natural flow regime and to identify predictors of alteration. The type and magnitude of hydrologic alteration varied widely by dam, but the largest changes were to critical characteristics of the flood pulse. Impacts were largest for low-elevation, large-reservoir dams; however, small dams had enormous impacts relative to electricity production. Finally, the “cumulative” effect of multiple dams was significant but only for some aspects of the flow regime. This analysis is a first step toward the development of environmental flows plans and policies relevant to the Amazon and other megadiverse river basins. PMID:29109972

  6. Construction of a Dry Ash Dam with Soilbags and Slope Stability Analysis

    NASA Astrophysics Data System (ADS)

    Li, Hui; Song, Yingjun; Gao, Jiaorong; Li, Longhua; Zhou, Yuqi; Qi, Hui

    2017-12-01

    In thermal power plants, it is necessary to build ash dams to store fly ash, which is the by-product after the combustion of coals. To solve the problem of lacking rockfill materials in Africa, A new technology of constructing ash dams using solibags filled with local sands is proposed and the method of analyzing its slope stability is suggested. The design of the ash dam using soilbags in Lamb Thermal Power Plant of Kenya is introduced in detail. The slope stability of the soilbags-constructed ash dam was analyzed by adopting the suggested method. The results show that the soilbags filled with ash or sands have high compressive strength, and the primary dam constructed with soilbags can effectively retain the backfill ash and the stacking dam reinforced with soilbags can stand stable even with the slope of 1:1.5.

  7. Adjustments in channel morphology due to land-use changes and check dam installation in mountain torrents of Calabria (Southern Italy)

    NASA Astrophysics Data System (ADS)

    Fortugno, Diego; Zema, Demetrio Antonio; Bombino, Giuseppe; Tamburino, Vincenzo; Quinonero Rubio, Juan Manuel; Boix-Fayos, Carolina

    2016-04-01

    In Mediterranean semi-arid conditions the geomorphic effects of land-use changes and check dam installation on active channel headwater morphology are not completely understood. In such environments, the availability of specific studies, which monitor channel adjustments as a response to reforestation and check dams over representative observation periods, could help develop new management strategies and erosion control measures. This investigation is an integrated approach assessing the adjustments of channel morphology in a typical torrent (Sant'Agata, Calabria, Southern Italy) after land-use changes (e.g. fire, reforestation, land abandonment) and check dam construction across a period of about 60 years (1955-2012). A statistical analysis of historical rainfall records, an analysis of land-use change in the catchment area and a geomorphological mapping of channel adjustments were carried out and combined with field surveys of bed surface grain-size over a 5-km reach including 14 check dams. The analysis of the historical rainfall records showed a slight decrease in the amount and erosivity of precipitation. Mapping of land-use changes highlighted a general increase of vegetal coverage on the slopes adjacent to the monitored reaches. Together with the check dam network installation, this increase could have induced a reduction in water and sediment supply. The different erosional and depositional forms and adjustments showed a general narrowing between consecutive check dams together with local modifications detected upstream (bed aggradation and cross section expansion together with low-flow realignments) and downstream (local incision) of the installed check dams. Changes in the torrent bends were also detected as a response to erosional and depositional processes with different intensities. The study highlighted: (i) the efficiency of check dams against the disrupting power of the most intense floods by stabilising the active channel; and (ii) the influence of reforestation in increasing hillslope protection from erosion and disconnectivity of water and sediment flows towards the active channel. The residual sediment deficit circulating in the watershed suggests the need of slight management interventions, as, for instance, the conversion of the existing check dams into open structures, allowing a definite channel and coast stability.

  8. A hydrodynamic modelling of proposed dams in reducing flood hazard in Kelantan Catchment

    NASA Astrophysics Data System (ADS)

    Maruti, S. F.; Amerudin, S.; Kadir, W. H. W.; Yusof, Z. M.

    2018-04-01

    Flood is natural disaster that can cause damage and death. The flood that hit Kelantan in 2014 was the worst flood in Malaysian history. Although the disaster could not be avoided, awareness and preparedness could have helped to reduce the impact. Kuala Krai located at the downstream area in Kelantan catchment is the most affected due to the 2014 floods. The confluence of Lebir and Galas rivers into Kelantan river has led to the increase of flood magnitude to the downstream area. Therefore, Kemubu dam and Lebir dam, located along Galas river and Lebir river, respectively, have been proposed by the Kelantan authority to reduce the flood hazard. In this paper, a hydrodynamic modelling study is carried out, which is coupled of 1D and 2D model to simulate the flood event with and without the proposed dams. The model is developed using a Digital Terrain Model (DTM), which was generated from Airborne LiDAR and SRTM data sources. The hydrograph and water level for 2014 floods event were obtained and was set as an input data for boundary conditions. The modelling results of maximum velocity of 33 m/s and water depth of 19 m were used to generate flood hazard map. The result has found that the proposed dams were able to reduce the flood hazard, particularly at Kuala Krai, Kelantan.

  9. Adiponectin Deficiency Impairs Maternal Metabolic Adaptation to Pregnancy in Mice.

    PubMed

    Qiao, Liping; Wattez, Jean-Sebastien; Lee, Samuel; Nguyen, Amanda; Schaack, Jerome; Hay, William W; Shao, Jianhua

    2017-05-01

    Hypoadiponectinemia has been widely observed in patients with gestational diabetes mellitus (GDM). To investigate the causal role of hypoadiponectinemia in GDM, adiponectin gene knockout ( Adipoq -/- ) and wild-type (WT) mice were crossed to produce pregnant mouse models with or without adiponectin deficiency. Adenoviral vector-mediated in vivo transduction was used to reconstitute adiponectin during late pregnancy. Results showed that Adipoq -/- dams developed glucose intolerance and hyperlipidemia in late pregnancy. Increased fetal body weight was detected in Adipoq -/- dams. Adiponectin reconstitution abolished these metabolic defects in Adipoq -/- dams. Hepatic glucose and triglyceride production rates of Adipoq -/- dams were significantly higher than those of WT dams. Robustly enhanced lipolysis was found in gonadal fat of Adipoq -/- dams. Interestingly, similar levels of insulin-induced glucose disposal and insulin signaling in metabolically active tissues in Adipoq -/- and WT dams indicated that maternal adiponectin deficiency does not reduce insulin sensitivity. However, remarkably decreased serum insulin concentrations were observed in Adipoq -/- dams. Furthermore, β-cell mass, but not glucose-stimulated insulin release, in Adipoq -/- dams was significantly reduced compared with WT dams. Together, these results demonstrate that adiponectin plays an important role in controlling maternal metabolic adaptation to pregnancy. © 2017 by the American Diabetes Association.

  10. Adiponectin Deficiency Impairs Maternal Metabolic Adaptation to Pregnancy in Mice

    PubMed Central

    Qiao, Liping; Wattez, Jean-Sebastien; Lee, Samuel; Nguyen, Amanda; Schaack, Jerome; Hay, William W.

    2017-01-01

    Hypoadiponectinemia has been widely observed in patients with gestational diabetes mellitus (GDM). To investigate the causal role of hypoadiponectinemia in GDM, adiponectin gene knockout (Adipoq−/−) and wild-type (WT) mice were crossed to produce pregnant mouse models with or without adiponectin deficiency. Adenoviral vector–mediated in vivo transduction was used to reconstitute adiponectin during late pregnancy. Results showed that Adipoq−/− dams developed glucose intolerance and hyperlipidemia in late pregnancy. Increased fetal body weight was detected in Adipoq−/− dams. Adiponectin reconstitution abolished these metabolic defects in Adipoq−/− dams. Hepatic glucose and triglyceride production rates of Adipoq−/− dams were significantly higher than those of WT dams. Robustly enhanced lipolysis was found in gonadal fat of Adipoq−/− dams. Interestingly, similar levels of insulin-induced glucose disposal and insulin signaling in metabolically active tissues in Adipoq−/− and WT dams indicated that maternal adiponectin deficiency does not reduce insulin sensitivity. However, remarkably decreased serum insulin concentrations were observed in Adipoq−/− dams. Furthermore, β-cell mass, but not glucose-stimulated insulin release, in Adipoq−/− dams was significantly reduced compared with WT dams. Together, these results demonstrate that adiponectin plays an important role in controlling maternal metabolic adaptation to pregnancy. PMID:28073830

  11. Large dams and alluvial rivers in the Anthropocene: The impacts of the Garrison and Oahe Dams on the Upper Missouri River

    USGS Publications Warehouse

    Skalak, Katherine; Benthem, Adam J.; Schenk, Edward R.; Hupp, Cliff R.; Galloway, Joel M.; Nustad, Rochelle A.; Wiche, Gregg J.

    2013-01-01

    The Missouri River has had a long history of anthropogenic modification with considerable impacts on river and riparian ecology, form, and function. During the 20th century, several large dam-building efforts in the basin served the needs for irrigation, flood control, navigation, and the generation of hydroelectric power. The managed flow provided a range of uses, including recreation, fisheries, and habitat. Fifteen dams impound the main stem of the river, with hundreds more on tributaries. Though the effects of dams and reservoirs are well-documented, their impacts have been studied individually, with relatively little attention paid to their interaction along a river corridor. We examine the morphological and sedimentological changes in the Upper Missouri River between the Garrison Dam in ND (operational in 1953) and Oahe Dam in SD (operational in 1959). Through historical aerial photography, stream gage data, and cross sectional surveys, we demonstrate that the influence of the upstream dam is still a major control of river dynamics when the backwater effects of the downstream reservoir begin. In the “Anthropocene”, dams are ubiquitous on large rivers and often occur in series, similar to the Garrison Dam Segment. We propose a conceptual model of how interacting dams might affect river geomorphology, resulting in distinct and recognizable morphologic sequences that we term “Inter-Dam sequence” characteristic of major rivers in the US.

  12. Dams, Hydrology and Risk in Future River Management

    NASA Astrophysics Data System (ADS)

    Wegner, D. L.

    2017-12-01

    Across America there are over 80,000 large to medium dams and globally the number is in excess of 800,000. Currently there are over 1,400 dams and diversion structures being planned or under construction globally. In addition to these documented dams there are thousands of small dams populating watersheds. Governments, agencies, native tribes, private owners and regulators all have a common interest in safe dams. Often dam safety is characterized as reducing structural risk while providing for maximum operational flexibility. In the 1970's there were a number of large and small dam failures in the United States. These failures prompted the federal government to issue voluntary dam safety guidelines. These guidelines were based on historic information incorporated into a risk assessment process to analyze, evaluate and manage risk with the goal to improve the quality of and support of dam management and safety decisions. We conclude that historic and new risks need to be integrated into dam management to insure adequate safety and operational flexibility. A recent assessment of the future role of dams in the United States premises that future costs such as maintenance or removal beyond the economic design life have not been factored into the long-term operations or relicensing of dams. The converging risks associated with aging water storage infrastructure, multiple dams within watersheds and uncertainty in demands policy revisions and an updated strategic approach to dam safety. Decisions regarding the future of dams in the United States may, in turn, influence regional water planning and management. Leaders in Congress and in the states need to implement a comprehensive national water assessment and a formal analysis of the role dams play in our water future. A research and national policy agenda is proposed to assess future impacts and the design, operation, and management of watersheds and dams.

  13. User's guide for a general purpose dam-break flood simulation model (K-634)

    USGS Publications Warehouse

    Land, Larry F.

    1981-01-01

    An existing computer program for simulating dam-break floods for forecast purposes has been modified with an emphasis on general purpose applications. The original model was formulated, developed and documented by the National Weather Service. This model is based on the complete flow equations and uses a nonlinear implicit finite-difference numerical method. The first phase of the simulation routes a flood wave through the reservoir and computes an outflow hydrograph which is the sum of the flow through the dam 's structures and the gradually developing breach. The second phase routes this outflow hydrograph through the stream which may be nonprismatic and have segments with subcritical or supercritical flow. The results are discharge and stage hydrographs at the dam as well as all of the computational nodes in the channel. From these hydrographs, peak discharge and stage profiles are tabulated. (USGS)

  14. Sediment Transport Over Run-of-River Dams

    NASA Astrophysics Data System (ADS)

    O'Brien, M.; Magilligan, F. J.; Renshaw, C. E.

    2016-12-01

    Dams have numerous documented effects that can degrade river habitat downstream. One significant effect of large dams is their ability to trap sediment delivered from upstream. This trapping can alter sediment transport and grain size downstream - effects that often motivate dam removal decisions. However, recent indirect observations and modeling studies indicate that small, run-of-river (ROR) dams, which do not impede discharge, may actually leak sediment downstream. However, there are no direct measurements of sediment flux over ROR dams. This study investigates flow and sediment transport over four to six different New England ROR dams over a summer-fall field season. Sediment flux was measured using turbidity meters and tracer (RFID) cobbles. Sediment transport was also monitored through an undammed control site and through a river where two ROR dams were recently removed. These data were used to predict the conditions that contribute to sediment transport and trapping. Year 1 data show that tracer rocks of up to 61 mm were transported over a 3 m ROR dam in peak flows of 84% of bankfull stage. These tracer rocks were transported over and 10 m beyond the dam and continue to move downstream. During the same event, comparable suspended sediment fluxes of up to 81 g/s were recorded both upstream and downstream of the dam at near-synchronous timestamps. These results demonstrate the potential for sediment transport through dammed rivers, even in discharge events that do not exceed bankfull. This research elucidates the effects of ROR dams and the controls on sediment transport and trapping, contributions that may aid in dam management decisions.

  15. Compliance Monitoring of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam

    The purpose of this compliance study was to estimate dam passage survival of yearling and subyearling Chinook salmon and steelhead smolts at John Day Dam during the spring and summer outmigrations in 2012. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 for spring migrants and greater than or equal to 0.93 for summer migrants, estimated with a standard error (SE) less than or equal to 0.015. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailracemore » 3 km downstream of the dam, as well as the forebay residence time, tailrace egress time, spill passage efficiency (SPE), and fish passage efficiency (FPE), as required in the Columbia Basin Fish Accords (Fish Accords). A virtual/paired-release design was used to estimate dam passage survival at John Day Dam. The approach included releases of smolts, tagged with acoustic micro-transmitters, above John Day Dam that contributed to the formation of a virtual release at the face of John Day Dam. A survival estimate from this release was adjusted by a paired release below John Day Dam. A total of 3376 yearling Chinook salmon, 5726 subyearling Chinook salmon, and 3239 steelhead smolts were used in the virtual releases. Sample sizes for the below-dam paired releases (R2 and R3, respectively) were 997 and 995 for yearling Chinook salmon smolts, 986 and 983 for subyearling Chinook salmon smolts, and 1000 and 1000 for steelhead smolts. The Juvenile Salmon Acoustic Telemetry System (JSATS) tags were manufactured by Advanced Telemetry Systems. Model SS300 tags, weighing 0.304 g in air, were surgically implanted in yearling and subyearling Chinook salmon, and Model SS130 tag, weighing 0.438 g in air, were surgically implanted in juvenile steelhead for this investigation. The intent of the spring study was to estimate dam passage survival during both 30% and 40% spill conditions. The two spill conditions were to be systematically performed in alternating 2-day test intervals over the course of the spring outmigration. High flow conditions in 2012 interrupted the spill study. Dam passage survival was therefore estimated season-wide regardless of spill conditions.« less

  16. A video method to study Drosophila sleep.

    PubMed

    Zimmerman, John E; Raizen, David M; Maycock, Matthew H; Maislin, Greg; Pack, Allan I

    2008-11-01

    To use video to determine the accuracy of the infrared beam-splitting method for measuring sleep in Drosophila and to determine the effect of time of day, sex, genotype, and age on sleep measurements. A digital image analysis method based on frame subtraction principle was developed to distinguish a quiescent from a moving fly. Data obtained using this method were compared with data obtained using the Drosophila Activity Monitoring System (DAMS). The location of the fly was identified based on its centroid location in the subtracted images. The error associated with the identification of total sleep using DAMS ranged from 7% to 95% and depended on genotype, sex, age, and time of day. The degree of the total sleep error was dependent on genotype during the daytime (P < 0.001) and was dependent on age during both the daytime and the nighttime (P < 0.001 for both). The DAMS method overestimated sleep bout duration during both the day and night, and the degree of these errors was genotype dependent (P < 0.001). Brief movements that occur during sleep bouts can be accurately identified using video. Both video and DAMS detected a homeostatic response to sleep deprivation. Video digital analysis is more accurate than DAMS in fly sleep measurements. In particular, conclusions drawn from DAMS measurements regarding daytime sleep and sleep architecture should be made with caution. Video analysis also permits the assessment of fly position and brief movements during sleep.

  17. Assessing the effects of check dams on sediment dynamics in a debris-flow catchment through SfM technique

    NASA Astrophysics Data System (ADS)

    Cucchiaro, Sara; Beinat, Alberto; Calsamiglia, Aleix; Cavalli, Marco; Cazorzi, Federico; Crema, Stefano; Marchi, Lorenzo

    2017-04-01

    The Moscardo Torrent (eastern Italian Alps) is a small rugged catchment (drainage area 4.1 km2, range in elevation between 890 and 2043 m) frequently affected by debris flows that deliver large amounts of sediment to the receiving stream, and cause concerns for infrastructures located on the alluvial fan and near the confluence. Over the last decades, hydraulic control works were implemented in the main channel to limit bed erosion and to stabilize channel banks. Although the objectives of training works have been only partly achieved, check dams and hillslope stabilization works have affected the sediment transfer from hillslopes to the channels and along the main channel. The effects of hydraulic control works were investigated by means of multi-temporal Structure from Motion (SfM) surveys based on images taken from the ground and UAV. The ground and air based surveys were carried out over a channel reach in which two check dams have recently been built. SfM surveys were taken before and after three debris-flow events (occurred between June and July 2016), allowing the generation of four high-resolution Digital Elevation Models (DEMs). Geomorphic changes caused by the debris-flow events have been assessed in order to produce the DEM of Differences (DoDs with a 0.2 m spatial resolution) that allowed estimating erosion and deposition volumes in the study area. Furthermore a debris-flow monitoring system has been in operation in the Moscardo Torrent; the analysis of the videos and of the hydrographs recorded by ultrasonic sensors permitted to assess the debris-flow volumes. These estimates were used to characterize the magnitude of events in support of the topographic analysis. By examining the changing pattern of erosion and deposition over time it was possible to understand the check dams' effects on sediment dynamics. The results show that the new check dams effectively stored sediment transported by the three debris flows. However, once the check dams have been completely filled, they lost their functionality, letting sediment flow downstream along paths drawn accidentally by the torrent control works and by the morphology of debris-flow deposits. Moreover, debris-flow lobes deposited upstream of the check dams could act as sediment sources further increasing downstream debris-flow magnitude.

  18. Effect of beaver dams on the hydrology of small mountain streams: Example from the Chevral in the Ourthe Orientale basin, Ardennes, Belgium

    NASA Astrophysics Data System (ADS)

    Nyssen, J.; Pontzeele, J.; Billi, P.

    2011-05-01

    SummaryThe European beaver ( Castor fiber) was recently reintroduced to Belgium, after an absence of more than 150 years; around 120 beaver dam systems have been established. In Europe, few studies consider the hydrological effects of those dams, and the spatial scale larger than that of one beaver pond system has not been addressed at all. This research focuses on the hydrological effects of a series of six beaver dams on the Chevral R., a second order tributary of the Ourthe Orientale R. in a forested area of the Ardennes. Thereby, also the Ourthe Orientale sub-basin itself was taken into account, being the area with probably the highest density of beaver dams in Belgium. The main research questions regarded: (1) the extent to which discharge peaks are reduced at the very location and well downstream of beaver dams and (2) the impact of the beaver dams on low flows. The first approach consisted of a temporal analysis of the Ourthe Orientale discharge and precipitation data for the periods 1978-2003 (before) and 2004-2009 (after the establishment of beaver dams in the sub-basin). The second study determined the in situ impact of the beaver dams: discharges were measured (September 2009-March 2010) upstream as well as downstream of the 0.52 ha beaver dam system on the Chevral river, and changes in water level within the system of six dams were monitored. Our findings indicate that there is a significant lowering of discharge peaks in the downstream river reaches due to the effect of the beaver dams. The temporal analysis of the Ourthe Orientale sub-basin shows an increase in the recurrence interval for major floods; for instance, the recurrence interval of a reference flood of 60 m 3 s -1 increased from 3.4 years to 5.6 years since the establishment of the beaver dams. At the scale of the Chevral beaver dams' site, we measured that the dams top off the peak flows, in addition delaying them by approximately 1 day. There are also increased low flows: Q355 (i.e. the discharge exceeded 355 days in a year) of the Ourthe Orientale was 0.6 (±0.15) m 3 s -1 before beaver dam installation and 0.88 (±0.52) m 3 s -1 thereafter. These findings agree with studies that suggest natural measures for flood control at the level of small mountain streams instead or in complement of building large anthropogenic constructions. Nevertheless, more studies are needed to assess the effectiveness of beaver dams in flood mitigation at the scale of sub-basins.

  19. 3D Finite Element Analysis of Yixing CFRD Built on Inclined Mountain Slope

    NASA Astrophysics Data System (ADS)

    Sun, Da Wei; Zhang, Liang; Qing Yao, Hui; Wang, Kang Ping

    2018-05-01

    There are few CFRDs built on steep slope with dam height more than 50 m. So does the relative design and construction experience. The 75 m-high Yixing CFRD was built on steep mountain slope and the 45.9m-high gravity retaining wall was used to against dam sliding. Since the excessive deformation of dam body and perimetric joints would lead to failure of seal materials and cause water leakage, 3D nonlinear finite element stress-deformation analysis was carried out. 3D finite element mesh with 63875 elements including retaining wall and surrounding mountain was established by use of advanced grid discreteness technique. Large scales of equations solving method were adopted in the computer procedure and the calculation time was greatly reduced from former 40 hours to now 45 minutes. Therefore the behavior of the dam, retaining wall and the joint was obtained in a short time, and the results would be helpful to the design and construction of Yixing dam.

  20. Analysis of High Resolution Satellite imagery to acsees Glacier Mass Balance and Lake Hazards in Sikkim Himalayas

    NASA Astrophysics Data System (ADS)

    Bhushan, S.; Shean, D. E.; Haritashya, U. K.; Arendt, A. A.; Syed, T. H.; Setiawan, L.

    2017-12-01

    Glacial lake outburst floods can impact downstream communities due to the sudden outflux of huge quantities of stored water. In this study, we develop a hazard assessment of the moraine dammed glacial lakes in Sikkim Himalayas by analyzing the morphometry of proglacial features, and the surface velocity and mass balance of glaciers. We generated high-resolution digital elevation models (DEMs) using the open-source NASA Ames Stereo Pipeline (ASP) and use other open-source tools to calculate surface velocity and patterns of glacier downwasting over time. Geodetic glacier mass balance is obtained for three periods using high-resolution WorldView/GeoEye stereo DEMs (8 m posting, 2014-2016), Cartosat-1 stereo DEMs (10 m, 2006-2008) and SRTM (30 m, 2000). Initial results reveal a region-wide mass balance of -0.31±0.13 m w.eq.a-1 for the 2007-2015 period, with some debris covered glaciers showing a very low mass loss rate. Additionally, 12 annual glacier velocity fields spanning from 1991 to 2017.derived from Landsat imagery are used to explore the relationship between glacier dynamics and changes in proglacial lakes. Multi-temporal glacial lake mapping is conducted using Landsat and Cartosat imagery. Avalanche and rockfall modeling are combined with morphometric analysis of the proglacial lake area to assess the likelihood of glacial lake dam failure. The above parameters are integrated into a decision tree approach enabling categorization of moraine-dammed lakes according to their potential for outburst events.

  1. Data collection for cooperative water resources modeling in the Lower Rio Grande Basin, Fort Quitman to the Gulf of Mexico.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Passell, Howard David; Pallachula, Kiran; Tidwell, Vincent Carroll

    2004-10-01

    Water resource scarcity around the world is driving the need for the development of simulation models that can assist in water resources management. Transboundary water resources are receiving special attention because of the potential for conflict over scarce shared water resources. The Rio Grande/Rio Bravo along the U.S./Mexican border is an example of a scarce, transboundary water resource over which conflict has already begun. The data collection and modeling effort described in this report aims at developing methods for international collaboration, data collection, data integration and modeling for simulating geographically large and diverse international watersheds, with a special focus onmore » the Rio Grande/Rio Bravo. This report describes the basin, and the data collected. This data collection effort was spatially aggregated across five reaches consisting of Fort Quitman to Presidio, the Rio Conchos, Presidio to Amistad Dam, Amistad Dam to Falcon Dam, and Falcon Dam to the Gulf of Mexico. This report represents a nine-month effort made in FY04, during which time the model was not completed.« less

  2. Evaluation of energy expenditure in adult spring Chinook salmon migrating upstream in the Columbia River Basin: an assessment based on sequential proximate analysis

    USGS Publications Warehouse

    Mesa, M.G.; Magie, C.D.

    2006-01-01

    The upstream migration of adult anadromous salmonids in the Columbia River Basin (CRB) has been dramatically altered and fish may be experiencing energetically costly delays at dams. To explore this notion, we estimated the energetic costs of migration and reproduction of Yakima River-bound spring Chinook salmon Oncorhynchus tshawytscha using a sequential analysis of their proximate composition (i.e., percent water, fat, protein, and ash). Tissues (muscle, viscera, and gonad) were sampled from fish near the start of their migration (Bonneville Dam), at a mid point (Roza Dam, 510 km upstream from Bonneville Dam) and from fresh carcasses on the spawning grounds (about 100 km above Roza Dam). At Bonneville Dam, the energy reserves of these fish were remarkably high, primarily due to the high percentage of fat in the muscle (18-20%; energy content over 11 kJ g-1). The median travel time for fish from Bonneville to Roza Dam was 27 d and ranged from 18 to 42 d. Fish lost from 6 to 17% of their energy density in muscle, depending on travel time. On average, fish taking a relatively long time for migration between dams used from 5 to 8% more energy from the muscle than faster fish. From the time they passed Bonneville Dam to death, these fish, depending on gender, used 95-99% of their muscle and 73-86% of their viscera lipid stores. Also, both sexes used about 32% of their muscular and very little of their visceral protein stores. However, we were unable to relate energy use and reproductive success to migration history. Our results suggest a possible influence of the CRB hydroelectric system on adult salmonid energetics.

  3. Impacts of large dams on the complexity of suspended sediment dynamics in the Yangtze River

    NASA Astrophysics Data System (ADS)

    Wang, Yuankun; Rhoads, Bruce L.; Wang, Dong; Wu, Jichun; Zhang, Xiao

    2018-03-01

    The Yangtze River is one of the largest and most important rivers in the world. Over the past several decades, the natural sediment regime of the Yangtze River has been altered by the construction of dams. This paper uses multi-scale entropy analysis to ascertain the impacts of large dams on the complexity of high-frequency suspended sediment dynamics in the Yangtze River system, especially after impoundment of the Three Gorges Dam (TGD). In this study, the complexity of sediment dynamics is quantified by framing it within the context of entropy analysis of time series. Data on daily sediment loads for four stations located in the mainstem are analyzed for the past 60 years. The results indicate that dam construction has reduced the complexity of short-term (1-30 days) variation in sediment dynamics near the structures, but that complexity has actually increased farther downstream. This spatial pattern seems to reflect a filtering effect of the dams on the on the temporal pattern of sediment loads as well as decreased longitudinal connectivity of sediment transfer through the river system, resulting in downstream enhancement of the influence of local sediment inputs by tributaries on sediment dynamics. The TGD has had a substantial impact on the complexity of sediment series in the mainstem of the Yangtze River, especially after it became fully operational. This enhanced impact is attributed to the high trapping efficiency of this dam and its associated large reservoir. The sediment dynamics "signal" becomes more spatially variable after dam construction. This study demonstrates the spatial influence of dams on the high-frequency temporal complexity of sediment regimes and provides valuable information that can be used to guide environmental conservation of the Yangtze River.

  4. Monitoring of the Earth's surface deformation in the area of water dam Zarnowiec

    NASA Astrophysics Data System (ADS)

    Mojzes, Marcel; Wozniak, Marek; Habel, Branislav; Macak, Marek

    2017-04-01

    Mathematical and physical research directly motivates geodetic community which can provide very accurate measurements for testing of the proposed models Earth's surface motion near the water dams should be monitored due to the security of the area. This is a process which includes testing of existing models and their physical parameters. Change of the models can improve the practical results for analyzing the trends of motion in the area of upper reservoir of water dam Zarnowiec. Since 1998 Warsaw University of Technology realized a research focused on the horizontal displacements of the upper reservoir of water dam Zarnowiec. The 15 selected control points located on the upper reservoir crown of the water dam were monitored by classical distance measurements. It was found out that changes in the object's geometry occur due to the variation of the water level. The control measurements of the changes in the object's geometry occurring during the process of emptying and filling of the upper reservoir of water dam were compared with the deformations computed using improved Boussinesqués method programmed in the software MATLAB and ANSYS for elastic and isotropic half space as derivation of suitable potentials extended to the loaded region. The details and numerical results of this process are presented This presentation was prepared within the project "National Centre for Diagnostic of the Earth's Surface Deformations in the Area of Slovakia", ITMS code: 26220220108.

  5. Water temperature effects from simulated dam operations and structures in the Middle Fork Willamette River, western Oregon

    USGS Publications Warehouse

    Buccola, Norman L.; Turner, Daniel F.; Rounds, Stewart A.

    2016-09-14

    Significant FindingsStreamflow and water temperature in the Middle Fork Willamette River (MFWR), western Oregon, have been regulated and altered since the construction of Lookout Point, Dexter, and Hills Creek Dams in 1954 and 1961, respectively. Each year, summer releases from the dams typically are cooler than pre-dam conditions, with the reverse (warmer than pre-dam conditions) occurring in autumn. This pattern has been detrimental to habitat of endangered Upper Willamette River (UWR) Chinook salmon (Oncorhynchus tshawytscha) and UWR winter steelhead (O. mykiss) throughout multiple life stages. In this study, scenarios testing different dam-operation strategies and hypothetical dam-outlet structures were simulated using CE-QUAL-W2 hydrodynamic/temperature models of the MFWR system from Hills Creek Lake (HCR) to Lookout Point (LOP) and Dexter (DEX) Lakes to explore and understand the efficacy of potential flow and temperature mitigation options.Model scenarios were run in constructed wet, normal, and dry hydrologic calendar years, and designed to minimize the effects of Hills Creek and Lookout Point Dams on river temperature by prioritizing warmer lake surface releases in May–August and cooler, deep releases in September–December. Operational scenarios consisted of a range of modified release rate rules, relaxation of power-generation constraints, variations in the timing of refill and drawdown, and maintenance of different summer maximum lake levels at HCR and LOP. Structural scenarios included various combinations of hypothetical floating outlets near the lake surface and hypothetical new outlets at depth. Scenario results were compared to scenarios using existing operational rules that give temperature management some priority (Base), scenarios using pre-2012 operational rules that prioritized power generation over temperature management (NoBlend), and estimated temperatures from a without-dams condition (WoDams).Results of the tested model scenarios led to the following conclusions:The existing outlets at Lookout Point Dam, because of the range of depths, allow for greater temperature control than the two existing outlets at Hills Creek Dam that are relatively deep.Temperature control at HCR through operational scenarios generally was minimal near Hills Creek Dam, but improved downstream toward the head of LOP when decreased release rates held HCR at a low lake elevation year-round.Inflows from unregulated streams between HCR and LOP helped to dilute the effects of HCR and achieve more natural stream temperatures before the MFWR entered LOP.The relative benefit of any particular scenario depended on the location in the MFWR system used to assess the potential change, with most scenarios involving changes to Hills Creek Dam being less effective with increasing downstream distance, such as downstream of DEX.To achieve as much temperature control as the most successful structural scenarios, which were able to resemble without-dam conditions for part of the year, most operational scenarios had to be free of any power-generation requirements at Lookout Point Dam.Downstream of DEX, scenarios incorporating a hypothetical floating outlet at either HCR or LOP resulted in similar temperatures, with both scenarios causing a delay in the estimated spring Chinook egg emergence by about 9–10 days compared to base-case temperature-management scenarios.

  6. Risk Perception Analysis Related To Existing Dams In Italy

    NASA Astrophysics Data System (ADS)

    Solimene, Pellegrino

    2013-04-01

    In the first part of this work, the progress of Italian National Rules about dams design, construction and operation are presented to highlight the strong connection existing between the promulgation of new decrees, as a consequence of a dam accidents, and the necessity to prevent further loss of lives and goods downstream. Following the Gleno Dam failure (1923), a special Ministerial Committee wrote out the first Regulations and made the proposal to establish, within the High Council of Public Works, a special department that become soon the "Dam Service", with the tasks of control and supervision about construction and operation phases of the dams and their reservoirs. A different definition of tasks and the structure of Dam Service were provided in accordance with law n° 183/1989, which transferred all the technical services to the Office of the Prime Minister; the aim was to join the Dam Office with the Department for National Technical Services, with the objective of increasing the knowledge of the territory and promoting the study on flood propagation downstream in case of operations on bottom outlet or hypothetical dam-break. In fact, population living downstream is not ready to accept any amount of risk because has not a good knowledge of the efforts of experts involved in dam safety, both from the operators and from the safety Authority. So it's important to optimize all the activities usually performed in a dam safety program and improve the emergency planning as a response to people's primary needs and feeling about safety from Civil Protection Authority. In the second part of the work, a definition of risk is provided as the relationship existing between probability of occurrence and loss, setting out the range within to plan for prevention (risk mitigation), thanks to the qualitative assessment of the minimum safety level that is suited to assign funds to plan for Civil Protection (loss mitigation). The basic meaning of the reliability of a zoned earthfill dam is illustrated by defining the risk analysis during its construction and operation. A qualitative "Event Tree Analysis" makes clear with an example the probability of occurrence of the events triggered by an earthquake, and leads to a classification of the damage level. Finally, a System Dynamics (SD) approach is presented to investigate possibilities of a preventive planning in relationship to the risk, so that it's possible to establish shared procedures to achieve the correct management in any crisis phase. As a qualitative result of a SD application, figure 1 presents a flow-chart about a case study on the same dam so to illustrate the emergency planning in a step by step procedure according to the Regulations.

  7. Dam Construction in Lancang-Mekong River Basin Could Mitigate Future Flood Risk From Warming-Induced Intensified Rainfall

    NASA Astrophysics Data System (ADS)

    Wang, Wei; Lu, Hui; Ruby Leung, L.; Li, Hong-Yi; Zhao, Jianshi; Tian, Fuqiang; Yang, Kun; Sothea, Khem

    2017-10-01

    Water resources management, in particular flood control, in the Lancang-Mekong River Basin (LMRB) faces two key challenges in the 21st century: climate change and dam construction. A large-scale distributed Geomorphology-Based Hydrological Model coupled with a simple reservoir regulation model (GBHM-LMK-SOP) is used to investigate the relative effects of climate change and dam construction on the flood characteristics in the LMRB. Results suggest an increase in both flood magnitude and frequency under climate change, which is more severe in the upstream basin and increases over time. However, stream regulation by dam reduces flood risk consistently throughout this century, with more obvious effects in the upstream basin where larger reservoirs will be located. The flood mitigation effect of dam regulation dominates over the flood intensification effect of climate change before 2060, but the latter emerges more prominently after 2060 and dominates the flood risk especially in the lower basin.

  8. Estimating and Comparing Dam Deformation Using Classical and GNSS Techniques.

    PubMed

    Barzaghi, Riccardo; Cazzaniga, Noemi Emanuela; De Gaetani, Carlo Iapige; Pinto, Livio; Tornatore, Vincenza

    2018-03-02

    Global Navigation Satellite Systems (GNSS) receivers are nowadays commonly used in monitoring applications, e.g., in estimating crustal and infrastructure displacements. This is basically due to the recent improvements in GNSS instruments and methodologies that allow high-precision positioning, 24 h availability and semiautomatic data processing. In this paper, GNSS-estimated displacements on a dam structure have been analyzed and compared with pendulum data. This study has been carried out for the Eleonora D'Arborea (Cantoniera) dam, which is in Sardinia. Time series of pendulum and GNSS over a time span of 2.5 years have been aligned so as to be comparable. Analytical models fitting these time series have been estimated and compared. Those models were able to properly fit pendulum data and GNSS data, with standard deviation of residuals smaller than one millimeter. These encouraging results led to the conclusion that GNSS technique can be profitably applied to dam monitoring allowing a denser description, both in space and time, of the dam displacements than the one based on pendulum observations.

  9. Gastrointestinal microbiota and mucosal immune gene expression in neonatal pigs reared in a cross-fostering model.

    PubMed

    Maradiaga, Nidia; Aldridge, Brian; Zeineldin, Mohamed; Lowe, James

    2018-05-06

    Cross fostering is employed to equalize the number of piglet between litters ensuring colostrum intake for their survival and growth. However, little is known about the impact of cross fostering on the intestinal microbiota and mucosal immune gene expression of the neonatal pig. The objective of this study was to determine the influence of maternal microbial communities on the gastrointestinal (GI) microbiota and mucosal immune gene expression in young pigs reared in a cross-fostering model. Piglets were given high quality colostrum from birth dam or foster dam upon birth. Twenty-four piglets were randomly assigned at birth to 1 of 3 treatments according to colostrum source and postcolostral milk feeding during, as follow: treatment 1 (n = 8), received colostrum and post-colostral milk feeding from their own dam; treatment 2 (n = 8), received colostrum from foster dam and returned to their own dam for post-colostral milk feeding; and treatment 3 (n = 8), received colostrum and post-colostral milk feeding from foster dam. Genomic DNA was extracted, and the V1-V3 hypervariable region of the bacterial 16S rRNA gene was amplified and sequenced using the Illumina MiSeq platform. Quantitative real-time PCR analysis was also performed to quantify the expression of toll-like receptors (TLR) 2, TLR 4, TLR 10, tumor necrosis factor alpha (TNFα), interferon gamma (IFNγ), and interleukin (IL) 4 and IL 10. Data analysis revealed that microbial communities were varied according to the GI biogeographical location, with colon being the most diverse section. Bacterial communities in both maternal colostrum and vaginal samples were significantly associated with those present in the fecal samples of piglets. Cross-fostering did not affect bacterial communities present in the piglet GI tract. However, the mRNA expression of TLR and inflammatory cytokines changed (P < 0.05) with biogeographical location in the GI tract. Higher mRNA expression of TLR and inflammatory cytokines was observed in ileum and ileum associated lymph tissues. This study suggests an impact of colostrum and maternal microbial communities on the microbiota development and mucosal immune gene expression in the newly born piglet. This study revealed novel information about the distribution and expression patterns of TLR and inflammatory cytokines in the GI tract of the young pig. Future studies are needed to determine the role and clinical importance of the mucosal microbiota and mucosal gene expression in health, productivity, and susceptibility to the development of GI disease, in piglets. Published by Elsevier Ltd.

  10. Dynamic Sliding Analysis of a Gravity Dam with Fluid-Structure-Foundation Interaction Using Finite Elements and Newmark's Sliding Block Analysis

    NASA Astrophysics Data System (ADS)

    Goldgruber, Markus; Shahriari, Shervin; Zenz, Gerald

    2015-11-01

    To reduce the natural hazard risks—due to, e.g., earthquake excitation—seismic safety assessments are carried out. Especially under severe loading, due to maximum credible or the so-called safety evaluation earthquake, critical infrastructure, as these are high dams, must not fail. However, under high loading local failure might be allowed as long as the entire structure does not collapse. Hence, for a dam, the loss of sliding stability during a short time period might be acceptable if the cumulative displacements after an event are below an acceptable value. This performance is not only valid for gravity dams but also for rock blocks as sliding is even more imminent in zones with higher seismic activity. Sliding modes cannot only occur in the dam-foundation contact, but also in sliding planes formed due to geological conditions. This work compares the qualitative possible and critical displacements for two methods, the well-known Newmark's sliding block analysis and a Fluid-Foundation-Structure Interaction simulation with the finite elements method. The results comparison of the maximum displacements at the end of the seismic event of the two methods depicts that for high friction angles, they are fairly close. For low friction angles, the results are differing more. The conclusion is that the commonly used Newmark's sliding block analysis and the finite elements simulation are only comparable for high friction angles, where this factor dominates the behaviour of the structure. Worth to mention is that the proposed simulation methods are also applicable to dynamic rock wedge problems and not only to dams.

  11. Dam removal increases American eel abundance in distant headwater streams

    USGS Publications Warehouse

    Hitt, Nathaniel P.; Eyler, Sheila; Wofford, John E.B.

    2012-01-01

    American eel Anguilla rostrata abundances have undergone significant declines over the last 50 years, and migration barriers have been recognized as a contributing cause. We evaluated eel abundances in headwater streams of Shenandoah National Park, Virginia, to compare sites before and after the removal of a large downstream dam in 2004 (Embrey Dam, Rappahannock River). Eel abundances in headwater streams increased significantly after the removal of Embrey Dam. Observed eel abundances after dam removal exceeded predictions derived from autoregressive models parameterized with data prior to dam removal. Mann–Kendall analyses also revealed consistent increases in eel abundances from 2004 to 2010 but inconsistent temporal trends before dam removal. Increasing eel numbers could not be attributed to changes in local physical habitat (i.e., mean stream depth or substrate size) or regional population dynamics (i.e., abundances in Maryland streams or Virginia estuaries). Dam removal was associated with decreasing minimum eel lengths in headwater streams, suggesting that the dam previously impeded migration of many small-bodied individuals (<300 mm TL). We hypothesize that restoring connectivity to headwater streams could increase eel population growth rates by increasing female eel numbers and fecundity. This study demonstrated that dams may influence eel abundances in headwater streams up to 150 river kilometers distant, and that dam removal may provide benefits for eel management and conservation at the landscape scale.

  12. Role of the check dam in land development on the Loess Plateau, China

    NASA Astrophysics Data System (ADS)

    Xu, Xiang-Zhou; Zhang, Luo-Hao; Zhu, Tongxin; Dang, Tian-Min; Zhang, Hong-Wu; Xu, Shi-Guo

    2017-04-01

    Check dam is one of the most effective measures to reduce flow connectivity, which can retain soil and water, and increase land productivity. More than 100,000 check dams have been built on the Loess Plateau since 1950s. However, quantifying the effect of check dams on water resources and water environments remains a challenge. In this study, an in-depth field investigation together with a credible statistical analysis was carried out in two representative catchments on the Loess Plateau, Nanxiaohegou Catchment and Jiuyuangou Catchment, to assess the effectiveness of check dams in soil, water and nutrients conservation. The results show: (1) Check dam plays an important role in conserving water, soil, and nutrients on the Loess Plateau. About half of the total transported water and more than 80 % of the total transported soil and nutrients, had been locally retained in the selected catchments. Hence check dams had a significant benefit to improve soil fertility in the small watersheds, and reducing water pollution downstream of dams. (2) Compared to terrace farmlands, forest lands and grasslands, check-dam lands were much more important in conserving water, soil and nutrients in the catchments. Nearly 50% of the reduced water and more than 70% of the stored soil and nutrients in the study catchments were solely retained by the check dams, whereas the area of the dam lands was less than 7% of the total conservation land area. (3) Check dams are still effective in large storms even if dams were damaged by floods. It is often assumed that check dams could only retain sediment in small flood events whereas most of the stored soil may be washed out as the dams may be destroyed in a disastrous flood. Furthermore, if a major check dam, namely the key project dam, was built in the gully outlet, the flood could be controlled, and thereupon the dam-break can be also avoided. We suggest that a compensation and incentive policy be implemented on dam building to realize the sustainable development of local economy and ecological environment.

  13. Landscape context and the biophysical response of rivers to dam removal in the United States

    PubMed Central

    Magilligan, Francis J.; Torgersen, Christian E.; Major, Jon J.; Anderson, Chauncey W.; Connolly, Patrick J.; Wieferich, Daniel; Shafroth, Patrick B.; Evans, James E.; Infante, Dana; Craig, Laura S.

    2017-01-01

    Dams have been a fundamental part of the U.S. national agenda over the past two hundred years. Recently, however, dam removal has emerged as a strategy for addressing aging, obsolete infrastructure and more than 1,100 dams have been removed since the 1970s. However, only 130 of these removals had any ecological or geomorphic assessments, and fewer than half of those included before- and after-removal (BAR) studies. In addition, this growing, but limited collection of dam-removal studies is limited to distinct landscape settings. We conducted a meta-analysis to compare the landscape context of existing and removed dams and assessed the biophysical responses to dam removal for 63 BAR studies. The highest concentration of removed dams was in the Northeast and Upper Midwest, and most have been removed from 3rd and 4th order streams, in low-elevation (< 500 m) and low-slope (< 5%) watersheds that have small to moderate upstream watershed areas (10–1000 km2) with a low risk of habitat degradation. Many of the BAR-studied removals also have these characteristics, suggesting that our understanding of responses to dam removals is based on a limited range of landscape settings, which limits predictive capacity in other environmental settings. Biophysical responses to dam removal varied by landscape cluster, indicating that landscape features are likely to affect biophysical responses to dam removal. However, biophysical data were not equally distributed across variables or clusters, making it difficult to determine which landscape features have the strongest effect on dam-removal response. To address the inconsistencies across dam-removal studies, we provide suggestions for prioritizing and standardizing data collection associated with dam removal activities. PMID:28692693

  14. Landscape context and the biophysical response of rivers to dam removal in the United States

    USGS Publications Warehouse

    Foley, Melissa M.; Magilligan, Francis J.; Torgersen, Christian E.; Major, Jon J.; Anderson, Chauncey; Connolly, Patrick J.; Wieferich, Daniel; Shafroth, Patrick B.; Evans, James E.; Infante, Dana M.; Craig, Laura

    2017-01-01

    Dams have been a fundamental part of the U.S. national agenda over the past two hundred years. Recently, however, dam removal has emerged as a strategy for addressing aging, obsolete infrastructure and more than 1,100 dams have been removed since the 1970s. However, only 130 of these removals had any ecological or geomorphic assessments, and fewer than half of those included before- and after-removal (BAR) studies. In addition, this growing, but limited collection of dam-removal studies is limited to distinct landscape settings. We conducted a meta-analysis to compare the landscape context of existing and removed dams and assessed the biophysical responses to dam removal for 63 BAR studies. The highest concentration of removed dams was in the Northeast and Upper Midwest, and most have been removed from 3rd and 4th order streams, in low-elevation (< 500 m) and low-slope (< 5%) watersheds that have small to moderate upstream watershed areas (10–1000 km2) with a low risk of habitat degradation. Many of the BAR-studied removals also have these characteristics, suggesting that our understanding of responses to dam removals is based on a limited range of landscape settings, which limits predictive capacity in other environmental settings. Biophysical responses to dam removal varied by landscape cluster, indicating that landscape features are likely to affect biophysical responses to dam removal. However, biophysical data were not equally distributed across variables or clusters, making it difficult to determine which landscape features have the strongest effect on dam-removal response. To address the inconsistencies across dam-removal studies, we provide suggestions for prioritizing and standardizing data collection associated with dam removal activities.

  15. Simulation of morphological changes due to dam removal

    USDA-ARS?s Scientific Manuscript database

    In this chapter, a brief review of numerical models and their applications for impact assessment of dam removal on sediment transport and morphological changes in alluvial rivers is given. As an example, a one-dimensional river flow and sediment transport model, CCHE1D, is applied to assess morpholo...

  16. Comparison of Dam Breach Parameter Estimators

    DTIC Science & Technology

    2008-01-01

    of the methods, when used in the HEC - RAS simulation model , produced comparable results. The methods tested suggest use of ...characteristics of a dam breach, use of those parameters within the unsteady flow routing model HEC - RAS , and the computation and display of the resulting...implementation of these breach parameters in

  17. Approximate Solutions for Ideal Dam-Break Sediment-Laden Flows on Uniform Slopes

    NASA Astrophysics Data System (ADS)

    Ni, Yufang; Cao, Zhixian; Borthwick, Alistair; Liu, Qingquan

    2018-04-01

    Shallow water hydro-sediment-morphodynamic (SHSM) models have been applied increasingly widely in hydraulic engineering and geomorphological studies over the past few decades. Analytical and approximate solutions are usually sought to verify such models and therefore confirm their credibility. Dam-break flows are often evoked because such flows normally feature shock waves and contact discontinuities that warrant refined numerical schemes to solve. While analytical and approximate solutions to clear-water dam-break flows have been available for some time, such solutions are rare for sediment transport in dam-break flows. Here we aim to derive approximate solutions for ideal dam-break sediment-laden flows resulting from the sudden release of a finite volume of frictionless, incompressible water-sediment mixture on a uniform slope. The approximate solutions are presented for three typical sediment transport scenarios, i.e., pure advection, pure sedimentation, and concurrent entrainment and deposition. Although the cases considered in this paper are not real, the approximate solutions derived facilitate suitable benchmark tests for evaluating SHSM models, especially presently when shock waves can be numerically resolved accurately with a suite of finite volume methods, while the accuracy of the numerical solutions of contact discontinuities in sediment transport remains generally poorer.

  18. Physical Hydraulic Model of Side-Channel Spillway of Lambuk DAM, Bali

    NASA Astrophysics Data System (ADS)

    Harifa, A. C.; Sholichin, M.; Othman, F. B.

    2013-12-01

    The spillway is among the most important structures of a dam project. A spillway is designed to prevent overtopping of a dam at a place that is not designed for overtopping. Side-channel spillways are commonly used to release water flow from a reservoir in places where the sides are steep and have a considerable height above the dam. Experimental results were collected with a hydraulic model of the side-channel spillway for releasing the peak overflow of Lambuk Dam. This dam is, located on the Lambuk River, which is a tributary of the Yeh Hoo River ~ 34.6 km north of Denpasar on the island of Bali. The bituminous geomembrane faced dam is 24 m in height, with a 35-m wide spillway. The length of the side channel is 35 m long, with 58 m of transition channel, 67.37 m of chuteway channel and 22.71 m of stilling basin. The capacity of the spillway is 231.91 m3/s and the outlet works capacity is 165.28 m3/s. The reservoir is designed for irrigation and water supply. The purpose of this study was to optimize the designed of the structure and to ensure its safe operation. In hydraulic model may help the decision-makers to visualize the flow field before selecting a ';suitable' design. The hydraulic model study was performed to ensure passage of the maximum discharge at maximum reservoir capacity; to study the spillway approach conditions, water surface profiles, and flow patterns in the chuteway; and to reveal potential demerits of the proposed hydraulic design of various structures and explore solutions. The model was constructed at 1 : 40 scale, Reservoir topography was modeled using concrete, the river bed using sand and some gravel, the river berm using concrete, and the spillway and channel using Plexiglas. Water was measured using Rectangular contracted weir. Design floods (with return period in year) were Q2 = 111.40 m3/s, Q5 = 136.84 m3/s, Q10 = 159.32 m3/s, Q25 = 174.61 m3/s, Q50 = 185.13 m3/s, Q100 = 198.08 m3/s, Q200 = 210.55 m3/s, Q1000 = 231.91 m3/s and the probable maximum flood was 476.88 m3/s. Hydraulic analysis of spillway used USBR method for spillway, Hind's equation for the side channel, energy equation with standard step method for the transition and chuteway channel. Local scouring depth was calculated using the Schotlisch and Veronise equation. Total head on crest spillway for Q2 = 0.92 m, Q1000 = 1.68 m and for QPMF = 1.92 m. The highest measurement error is 3.16% according to the total head on crest spillway. Cavitation was observed in chuteway. Flow is subcritical (Froude < 1) in the side channel and supercritical in the transition channel. The final design for the spillway and chuteway were safe from impact of cavitation, pulsating flow, and local scouring.

  19. Evaluating the effects of check dams on channel geometry, bed sediment size and riparian vegetation in Mediterranean mountain torrents.

    PubMed

    Zema, Demetrio Antonio; Bombino, Giuseppe; Denisi, Pietro; Lucas-Borja, Manuel Esteban; Zimbone, Santo Marcello

    2018-06-12

    In mountain streams possible negative impacts of check dams on soil, water and riparian vegetation due to check dam installation can be noticed. In spite of the ample literature on the qualitative effects of engineering works on channel hydrology, morphology, sedimentary effects and riparian vegetation characteristics, quantitative evaluations of the changes induced by check dams on headwater characteristics are rare. In order to fill this gap, this study has evaluated the effects of check dams located in headwaters of Calabria (Southern Italy) on hydrological and geomorphological processes and on the response of riparian vegetation to these actions. The analysis has compared physical and vegetation indicators in transects identified around check dams (upstream and downstream) and far from their direct influence (control transects). Check dams were found to influence significantly unit discharge, surface and subsurface sediments (both upstream and downstream), channel shape and transverse distribution of riparian vegetation (upstream) as well as cover and structure of riparian complexes (downstream). The actions of the structures on torrent longitudinal slope and biodiversity of vegetation were less significant. The differences on bed profile slope were significant only between upstream and downstream transects. The results of the Agglomerative Hierarchical Cluster analysis confirmed the substantial similarity between upstream and control transects, thus highlighting that the construction of check dams, needed to mitigate the hydro-geological risks, has not strongly influenced the torrent functioning and ecology before check dam construction. Moreover, simple and quantitative linkages between torrent hydraulics, geomorphology and vegetation characteristics exist in the analysed headwaters; these relationships among physical adjustments of channels and most of the resulting characteristics of the riparian vegetation are specific for the transect locations with respect of check dams. Conversely, the biodiversity of the riparian vegetation basically eludes any quantitative relations with the physical and other vegetal characteristics of the torrent transects. Copyright © 2018 Elsevier B.V. All rights reserved.

  20. Coupling groundwater and riparian vegetation models to assess effects of reservoir releases

    USGS Publications Warehouse

    Springer, Abraham E.; Wright, Julie M.; Shafroth, Patrick B.; Stromberg, Juliet C.; Patten, Duncan T.

    1999-01-01

    Although riparian areas in the arid southwestern United States are critical for maintaining species diversity, their extent and health have been declining since Euro‐American settlement. The purpose of this study was to develop a methodology to evaluate the potential for riparian vegetation restoration and groundwater recharge. A numerical groundwater flow model was coupled with a conceptual riparian vegetation model to predict hydrologic conditions favorable to maintaining riparian vegetation downstream of a reservoir. A Geographic Information System (GIS) was used for this one‐way coupling. Constant and seasonally varying releases from the dam were simulated using volumes anticipated to be permitted by a regional water supplier. Simulations indicated that seasonally variable releases would produce surface flow 5.4–8.5 km below the dam in a previously dry reach. Using depth to groundwater simulations from the numerical flow model with conceptual models of depths to water necessary for maintenance of riparian vegetation, the GIS analysis predicted a 5‐ to 6.5‐fold increase in the area capable of sustaining riparian vegetation.

  1. Ensemble flood simulation for a small dam catchment in Japan using 10 and 2 km resolution nonhydrostatic model rainfalls

    NASA Astrophysics Data System (ADS)

    Kobayashi, Kenichiro; Otsuka, Shigenori; Apip; Saito, Kazuo

    2016-08-01

    This paper presents a study on short-term ensemble flood forecasting specifically for small dam catchments in Japan. Numerical ensemble simulations of rainfall from the Japan Meteorological Agency nonhydrostatic model (JMA-NHM) are used as the input data to a rainfall-runoff model for predicting river discharge into a dam. The ensemble weather simulations use a conventional 10 km and a high-resolution 2 km spatial resolutions. A distributed rainfall-runoff model is constructed for the Kasahori dam catchment (approx. 70 km2) and applied with the ensemble rainfalls. The results show that the hourly maximum and cumulative catchment-average rainfalls of the 2 km resolution JMA-NHM ensemble simulation are more appropriate than the 10 km resolution rainfalls. All the simulated inflows based on the 2 and 10 km rainfalls become larger than the flood discharge of 140 m3 s-1, a threshold value for flood control. The inflows with the 10 km resolution ensemble rainfall are all considerably smaller than the observations, while at least one simulated discharge out of 11 ensemble members with the 2 km resolution rainfalls reproduces the first peak of the inflow at the Kasahori dam with similar amplitude to observations, although there are spatiotemporal lags between simulation and observation. To take positional lags into account of the ensemble discharge simulation, the rainfall distribution in each ensemble member is shifted so that the catchment-averaged cumulative rainfall of the Kasahori dam maximizes. The runoff simulation with the position-shifted rainfalls shows much better results than the original ensemble discharge simulations.

  2. Vulnerability of Karangkates dams area by means of zero crossing analysis of data magnetic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sunaryo,, E-mail: sunaryo@ub.ac.id, E-mail: sunaryo.geofis.ub@gmail.com; Susilo, Adi

    2015-04-24

    Study with entitled Vulnerability Karangkates Dam Area By Means of Zero Crossing Analysis of Data Magnetic has been done. The study was aimed to obtain information on the vulnerability of two parts area of Karangkates dams, i.e. Lahor dam which was inaugurated in 1977 and Sutami dam inaugurated in 1981. Three important things reasons for this study are: 1). The dam age was 36 years old for Lahor dam and 32 years old for Sutami dam, 2). Geologically, the location of the dams are closed together to the Pohgajih local shear fault, Selorejo local fault, and Selorejo limestone-andesite rocks contactmore » plane, and 3). Karangkates dams is one of the important Hydro Power Plant PLTA with the generating power of about 400 million KWH per year from a total of about 29.373MW installed in Indonesia. Geographically, the magnetic data acquisition was conducted at coordinates (112.4149oE;-8.2028oS) to (112.4839oE;-8.0989oS) by using Proton Precession Magnetometer G-856. Magnetic Data acquisition was conducted in the radial direction from the dams with diameter of about 10 km and the distance between the measurements about 500m. The magnetic data acquisition obtained the distribution of total magnetic field value in the range of 45800 nT to 44450 nT. Residual anomalies obtained by doing some corrections, including diurnal correction, International Geomagnetic Reference Field (IGRF) correction, and reductions so carried out the distribution of the total magnetic field value in the range of -650 nT to 700 nT. Based on the residual anomalies, indicate the presence of 2 zones of closed closures dipole pairs at located in the west of the Sutami dam and the northwest of the Lahor dam from 5 total zones. Overlapping on the local geological map indicated the lineament of zero crossing patterns in the contour of residual anomaly contour with the Pohgajih shear fault where located at about 4 km to the west of the Sutami dam approximately and andesite-limestone rocks contact where located at about 6 km to the west of the Lahor dam approximately. These shown a possible of vulnerability on geohazards at the west zone of the Karangkates (Lahor-Sutami) dams area if there are triggers by the vibration (earthquake) on the Pohgajih shear fault, andesite-limestone contact plane, and instability rocks on two zones of closed closure dipole pairs area. Reality, on the location of the study shown some local landslide at the several locations and the main road that need considering for disaster mitigation.« less

  3. Simulating potential structural and operational changes for Detroit Dam on the North Santiam River, Oregon, for downstream temperature management

    USGS Publications Warehouse

    Buccola, Norman L.; Rounds, Stewart A.; Sullivan, Annett B.; Risley, John C.

    2012-01-01

    Detroit Dam was constructed in 1953 on the North Santiam River in western Oregon and resulted in the formation of Detroit Lake. With a full-pool storage volume of 455,100 acre-feet and a dam height of 463 feet, Detroit Lake is one of the largest and most important reservoirs in the Willamette River basin in terms of power generation, recreation, and water storage and releases. The U.S. Army Corps of Engineers operates Detroit Dam as part of a system of 13 reservoirs in the Willamette Project to meet multiple goals, which include flood-damage protection, power generation, downstream navigation, recreation, and irrigation. A distinct cycle in water temperature occurs in Detroit Lake as spring and summer heating through solar radiation creates a warm layer of water near the surface and isolates cold water below. Controlling the temperature of releases from Detroit Dam, therefore, is highly dependent on the location, characteristics, and usage of the dam's outlet structures. Prior to operational changes in 2007, Detroit Dam had a well-documented effect on downstream water temperature that was problematic for endangered salmonid fish species, releasing water that was too cold in midsummer and too warm in autumn. This unnatural seasonal temperature pattern caused problems in the timing of fish migration, spawning, and emergence. In this study, an existing calibrated 2-dimensional hydrodynamic water-quality model [CE-QUAL-W2] of Detroit Lake was used to determine how changes in dam operation or changes to the structural release points of Detroit Dam might affect downstream water temperatures under a range of historical hydrologic and meteorological conditions. The results from a subset of the Detroit Lake model scenarios then were used as forcing conditions for downstream CE-QUAL-W2 models of Big Cliff Reservoir (the small reregulating reservoir just downstream of Detroit Dam) and the North Santiam and Santiam Rivers. Many combinations of environmental, operational, and structural options were explored with the model scenarios. Multiple downstream temperature targets were used along with three sets of environmental forcing conditions representing cool/wet, normal, and hot/dry conditions. Five structural options at Detroit Dam were modeled, including the use of existing outlets, one hypothetical variable-elevation outlet such as a sliding gate, a hypothetical combination of a floating outlet and a fixed-elevation outlet, and a hypothetical combination of a floating outlet and a sliding gate. Finally, 14 sets of operational guidelines for Detroit Dam were explored to gain an understanding of the effects of imposing different downstream minimum streamflows, imposing minimum outflow rules to specific outlets, and managing the level of the lake with different timelines through the year. Selected subsets of these combinations of operational and structural scenarios were run through the downstream models of Big Cliff Reservoir and the North Santiam and Santiam Rivers to explore how hypothetical changes at Detroit Dam might provide improved temperatures for endangered salmonids downstream of the Detroit-Big Cliff Dam complex. Conclusions that can be drawn from these model scenarios include: *The water-temperature targets set by the U.S. Army Corps of Engineers for releases from Detroit Dam can be met through a combination of new dam outlets or a delayed drawdown of the lake in autumn. *Spring and summer dam operations greatly affect the available release temperatures and operational flexibility later in the autumn. Releasing warm water during midsummer tends to keep more cool water available for release in autumn. *The ability to meet downstream temperature targets during spring depends on the characteristics of the available outlets. Under existing conditions, although warm water sometimes is present at the lake surface in spring and early summer, such water may not be available for release if the lake level is either well below or well above the spillway crest. *Managing lake releases to meet downstream temperature targets depends on having outlet structures that can access both (warm) lake surface water and (cold) deeper lake water throughout the year. The existing outlets at Detroit Dam do not allow near-surface waters to be released during times when the lake surface level is below the spillway (spring and autumn). *Using the existing outlets at Detroit Dam, lake level management is important to the water temperature of releases because it controls the availability and depth of water at the spillway. When lake level is lowered below the spillway crest in late summer, the loss of access to warm water at the lake surface can result in abrupt changes to release temperatures. *Because the power-generation intakes (penstocks) are 166 feet below the full-pool lake level, imposing minimum power production requirements at Detroit Dam limits the amount of warm surface water that can be expelled from the lake in midsummer, thereby postponing and amplifying warm outflows from Detroit Lake into the autumn spawning season. *Likewise, imposing minimum power production requirements at Detroit Dam in autumn can limit the amount of cool hypolimnetic water that is released from the lake, thereby limiting cool outflows from Detroit Lake during the autumn spawning season. *Model simulations indicate that a delayed drawdown of Detroit Lake in autumn would result in better control over release temperatures in the immediate downstream vicinity of Big Cliff Dam, but the reduced outflows necessary to retain more water in the lake in late summer are more susceptible to rapid heating downstream. *Compared to the existing outlets at Detroit Dam, floating or sliding-gate outlet structures can provide greater control over release temperatures because they provide better access to warm water at the lake surface and cooler water at depth. These conclusions can be grouped into several common themes. First, optimal and flexible management and achievement of downstream temperature goals requires that releases of warm water near the surface of the lake and cold water below the thermocline are both possible with the available dam outlets during spring, summer, and autumn. This constraint can be met to some extent with existing outlets, but only if access to the spillway is extended into autumn by keeping the lake level higher than called for by the current rule curve (the typical target water-surface elevation throughout the year). If new outlets are considered, a variable-elevation outlet such as a sliding gate structure, or a floating outlet in combination with a fixed-elevation outlet at sufficient depth to access cold water, is likely to work well in terms of accessing a range of water temperatures and achieving downstream temperature targets. Furthermore, model results indicate that it is important to release warm water from near the lake surface during midsummer. If not released downstream, the warm water will build up at the top of the lake as a result of solar energy inputs and the thermocline will deepen, potentially causing warm water to reach the depth of deeper fixed-elevation outlets in autumn, particularly when the lake level is drawn down to make room for flood storage. Delaying the drawdown in autumn can help to keep the thermocline above such outlets and preserve access to cold water. Although it is important to generate hydropower at Detroit Dam, minimum power-production requirements limit the ability of dam operators to meet downstream temperature targets with existing outlet structures. The location of the power penstocks below the thermocline in spring and most of summer causes the release of more cool water during summer than is optimal. Reducing the power-production constraint allows the temperature target to be met more frequently, but at the cost of less power generation. Finally, running the Detroit Dam, Big Cliff Dam, and North Santiam and Santiam River models in series allows dam operators to evaluate how different operational strategies or combinations of new dam outlets might affect downstream temperatures for many miles of critical endangered salmonid habitat. Temperatures can change quickly in these downstream reaches as the river exchanges heat with its surroundings, and heating or cooling of 6 degrees Celsius is not unusual in the 40–50 miles downstream of Big Cliff Dam. The results published in this report supersede preliminary results published in U.S. Geological Survey Open-File Report 2011-1268 (Buccola and Rounds, 2011). Those preliminary results are still valid, but the results in this report are more current and comprehensive.

  4. Centrifugal Modelling of Soil Structures. Part I. Centrifugal Modelling of Slope Failures.

    DTIC Science & Technology

    1979-03-01

    comparing successive photographs in which soil movement was noted by the change in position of the original grid of silvered indicator balls . Inherent in...SECIJ RITY CLASSIFICATION OF THIS PAGE(1Thon Pat& Entered) of uplift forces was also observed. In nineteen coal mine waste embankment dam models...In’nineteen coal mine waste embankment dam models, throughout which the soil particle size distribution was altered for modelling of dif- ferent

  5. Hydraulic analysis and double mass curves of the Middle Rio Grande from Cochiti to San Marcial, New Mexico

    Treesearch

    Jason M. Albert

    2004-01-01

    The Middle Rio Grande located in Central New Mexico is one of the most historically documented rivers in the United States. Since the early 20th century regulatory agencies have been interested and concerned with its management. A Hydraulic Modeling Analysis (HMA) of the Corrales reach, located 34 miles downstream of Cochiti Dam, was conducted. An extensive collection...

  6. Comparison of Extreme Precipitation Return Levels using Spatial Bayesian Hierarchical Modeling versus Regional Frequency Analysis

    NASA Astrophysics Data System (ADS)

    Love, C. A.; Skahill, B. E.; AghaKouchak, A.; Karlovits, G. S.; England, J. F.; Duren, A. M.

    2017-12-01

    We compare gridded extreme precipitation return levels obtained using spatial Bayesian hierarchical modeling (BHM) with their respective counterparts from a traditional regional frequency analysis (RFA) using the same set of extreme precipitation data. Our study area is the 11,478 square mile Willamette River basin (WRB) located in northwestern Oregon, a major tributary of the Columbia River whose 187 miles long main stem, the Willamette River, flows northward between the Coastal and Cascade Ranges. The WRB contains approximately two ­thirds of Oregon's population and 20 of the 25 most populous cities in the state. The U.S. Army Corps of Engineers (USACE) Portland District operates thirteen dams and extreme precipitation estimates are required to support risk­ informed hydrologic analyses as part of the USACE Dam Safety Program. Our intent is to profile for the USACE an alternate methodology to an RFA that was developed in 2008 due to the lack of an official NOAA Atlas 14 update for the state of Oregon. We analyze 24-hour annual precipitation maxima data for the WRB utilizing the spatial BHM R package "spatial.gev.bma", which has been shown to be efficient in developing coherent maps of extreme precipitation by return level. Our BHM modeling analysis involved application of leave-one-out cross validation (LOO-CV), which not only supported model selection but also a comprehensive assessment of location specific model performance. The LOO-CV results will provide a basis for the BHM RFA comparison.

  7. Paleoflood Data, Extreme Floods and Frequency: Data and Models for Dam Safety Risk Scenarios

    NASA Astrophysics Data System (ADS)

    England, J. F.; Godaire, J.; Klinger, R.

    2007-12-01

    Extreme floods and probability estimates are crucial components in dam safety risk analysis and scenarios for water-resources decision making. The field-based collection of paleoflood data provides needed information on the magnitude and probability of extreme floods at locations of interest in a watershed or region. The stratigraphic record present along streams in the form of terrace and floodplain deposits represent direct indicators of the magnitude of large floods on a river, and may provide 10 to 100 times longer records than conventional stream gaging records of large floods. Paleoflood data is combined with gage and historical streamflow estimates to gain insights to flood frequency scaling, model extrapolations and uncertainty, and provide input scenarios to risk analysis event trees. We illustrate current data collection and flood frequency modeling approaches via case studies in the western United States, including the American River in California and the Arkansas River in Colorado. These studies demonstrate the integration of applied field geology, hydraulics, and surface-water hydrology. Results from these studies illustrate the gains in information content on extreme floods, provide data- based means to separate flood generation processes, guide flood frequency model extrapolations, and reduce uncertainties. These data and scenarios strongly influence water resources management decisions.

  8. Predicting temperature drop rate of mass concrete during an initial cooling period using genetic programming

    NASA Astrophysics Data System (ADS)

    Bhattarai, Santosh; Zhou, Yihong; Zhao, Chunju; Zhou, Huawei

    2018-02-01

    Thermal cracking on concrete dams depends upon the rate at which the concrete is cooled (temperature drop rate per day) within an initial cooling period during the construction phase. Thus, in order to control the thermal cracking of such structure, temperature development due to heat of hydration of cement should be dropped at suitable rate. In this study, an attempt have been made to formulate the relation between cooling rate of mass concrete with passage of time (age of concrete) and water cooling parameters: flow rate and inlet temperature of cooling water. Data measured at summer season (April-August from 2009 to 2012) from recently constructed high concrete dam were used to derive a prediction model with the help of Genetic Programming (GP) software “Eureqa”. Coefficient of Determination (R) and Mean Square Error (MSE) were used to evaluate the performance of the model. The value of R and MSE is 0.8855 and 0.002961 respectively. Sensitivity analysis was performed to evaluate the relative impact on the target parameter due to input parameters. Further, testing the proposed model with an independent dataset those not included during analysis, results obtained from the proposed GP model are close enough to the real field data.

  9. Seismic Hazard and Ground Motion Characterization at the Itoiz Dam (Northern Spain)

    NASA Astrophysics Data System (ADS)

    Rivas-Medina, A.; Santoyo, M. A.; Luzón, F.; Benito, B.; Gaspar-Escribano, J. M.; García-Jerez, A.

    2012-08-01

    This paper presents a new hazard-consistent ground motion characterization of the Itoiz dam site, located in Northern Spain. Firstly, we propose a methodology with different approximation levels to the expected ground motion at the dam site. Secondly, we apply this methodology taking into account the particular characteristics of the site and of the dam. Hazard calculations were performed following the Probabilistic Seismic Hazard Assessment method using a logic tree, which accounts for different seismic source zonings and different ground-motion attenuation relationships. The study was done in terms of peak ground acceleration and several spectral accelerations of periods coinciding with the fundamental vibration periods of the dam. In order to estimate these ground motions we consider two different dam conditions: when the dam is empty ( T = 0.1 s) and when it is filled with water to its maximum capacity ( T = 0.22 s). Additionally, seismic hazard analysis is done for two return periods: 975 years, related to the project earthquake, and 4,975 years, identified with an extreme event. Soil conditions were also taken into account at the site of the dam. Through the proposed methodology we deal with different forms of characterizing ground motion at the study site. In a first step, we obtain the uniform hazard response spectra for the two return periods. In a second step, a disaggregation analysis is done in order to obtain the controlling earthquakes that can affect the dam. Subsequently, we characterize the ground motion at the dam site in terms of specific response spectra for target motions defined by the expected values SA ( T) of T = 0.1 and 0.22 s for the return periods of 975 and 4,975 years, respectively. Finally, synthetic acceleration time histories for earthquake events matching the controlling parameters are generated using the discrete wave-number method and subsequently analyzed. Because of the short relative distances between the controlling earthquakes and the dam site we considered finite sources in these computations. We conclude that directivity effects should be taken into account as an important variable in this kind of studies for ground motion characteristics.

  10. Comparative phylogenetic analysis and transcriptional profiling of MADS-box gene family identified DAM and FLC-like genes in apple (Malusx domestica)

    PubMed Central

    Kumar, Gulshan; Arya, Preeti; Gupta, Khushboo; Randhawa, Vinay; Acharya, Vishal; Singh, Anil Kumar

    2016-01-01

    The MADS-box transcription factors play essential roles in various processes of plant growth and development. In the present study, phylogenetic analysis of 142 apple MADS-box proteins with that of other dicotyledonous species identified six putative Dormancy-Associated MADS-box (DAM) and four putative Flowering Locus C-like (FLC-like) proteins. In order to study the expression of apple MADS-box genes, RNA-seq analysis of 3 apical and 5 spur bud stages during dormancy, 6 flower stages and 7 fruit development stages was performed. The dramatic reduction in expression of two MdDAMs, MdMADS063 and MdMADS125 and two MdFLC-like genes, MdMADS135 and MdMADS136 during dormancy release suggests their role as flowering-repressors in apple. Apple orthologs of Arabidopsis genes, FLOWERING LOCUS T, FRIGIDA, SUPPRESSOR OF OVEREXPRESSION OF CONSTANS 1 and LEAFY exhibit similar expression patterns as reported in Arabidopsis, suggesting functional conservation in floral signal integration and meristem determination pathways. Gene ontology enrichment analysis of predicted targets of DAM revealed their involvement in regulation of reproductive processes and meristematic activities, indicating functional conservation of SVP orthologs (DAM) in apple. This study provides valuable insights into the functions of MADS-box proteins during apple phenology, which may help in devising strategies to improve important traits in apple. PMID:26856238

  11. Comparative phylogenetic analysis and transcriptional profiling of MADS-box gene family identified DAM and FLC-like genes in apple (Malusx domestica).

    PubMed

    Kumar, Gulshan; Arya, Preeti; Gupta, Khushboo; Randhawa, Vinay; Acharya, Vishal; Singh, Anil Kumar

    2016-02-09

    The MADS-box transcription factors play essential roles in various processes of plant growth and development. In the present study, phylogenetic analysis of 142 apple MADS-box proteins with that of other dicotyledonous species identified six putative Dormancy-Associated MADS-box (DAM) and four putative Flowering Locus C-like (FLC-like) proteins. In order to study the expression of apple MADS-box genes, RNA-seq analysis of 3 apical and 5 spur bud stages during dormancy, 6 flower stages and 7 fruit development stages was performed. The dramatic reduction in expression of two MdDAMs, MdMADS063 and MdMADS125 and two MdFLC-like genes, MdMADS135 and MdMADS136 during dormancy release suggests their role as flowering-repressors in apple. Apple orthologs of Arabidopsis genes, FLOWERING LOCUS T, FRIGIDA, SUPPRESSOR OF OVEREXPRESSION OF CONSTANS 1 and LEAFY exhibit similar expression patterns as reported in Arabidopsis, suggesting functional conservation in floral signal integration and meristem determination pathways. Gene ontology enrichment analysis of predicted targets of DAM revealed their involvement in regulation of reproductive processes and meristematic activities, indicating functional conservation of SVP orthologs (DAM) in apple. This study provides valuable insights into the functions of MADS-box proteins during apple phenology, which may help in devising strategies to improve important traits in apple.

  12. Molecular modeling and cytotoxicity of diffractaic acid: HP-β-CD inclusion complex encapsulated in microspheres.

    PubMed

    Silva, Camilla V N S; Barbosa, Jéssica A P; Ferraz, Milena S; Silva, Nicácio H; Honda, Neli K; Rabello, Marcelo M; Hernandes, Marcelo Z; Bezerra, Beatriz P; Cavalcanti, Isabella M F; Ayala, Alejandro P; Santos, Noemia P S; Santos-Magalhães, Nereide S

    2016-11-01

    In this pioneer study, 2-hydroxypropyl-β-cyclodextrin (HP-β-CD) was used to improve the solubility of the diffractaic acid (DA) via inclusion complex (DA:HP-β-CD). Subsequently, DA:HP-β-CD was incorporated into poly-ε-caprolactone (PCL) microspheres (DA:HP-β-CD-MS). Microspheres containing DA (DA-MS) or DA:HP-β-CD (DA:HP-β-CD-MS) were prepared using the multiple W/O/W emulsion-solvent evaporation technique. The phase-solubility diagram of DA in HP-β-CD (10-50mM) showed an A L type curve with a stability constant K 1:1 =821M -1 . 1 H NMR, FTIR, X-ray diffraction and thermal analysis showed changes in the molecular environment of DA in DA:HP-β-CD. The molecular modeling approach suggests a guest-host complex formation between the carboxylic moiety of both DA and the host (HP-β-CD). The mean particle size of the microspheres were ∅ DA-MS =5.23±1.65μm and ∅ DA:HP-β-CD-MS =4.11±1.39μm, respectively. The zeta potential values of the microspheres were ζ DA-MS =-7.85±0.32mV and ζ DA:HP-β-CD-MS =-6.93±0.46mV. Moreover, the encapsulation of DA:HP-β-CD into microspheres resulted in a more slower release (k 2 =0.042±0.001; r 2 =0.996) when compared with DA-MS (k 2 =0.183±0.005; r 2 =0.996). The encapsulation of DA or DA:HP-β-CD into microspheres reduced the cytotoxicity of DA (IC 50 =43.29μM) against Vero cells (IC 50 of DA-MS=108.48μM and IC 50 of DA:HP-β-CD-MS=142.63μM). Copyright © 2016 Elsevier B.V. All rights reserved.

  13. The socio-economics dynamics of Dam on Rural Communities: A case study of Oyan Dam, Nigeria

    NASA Astrophysics Data System (ADS)

    Ayeni, Amidu; Ojifo, Lawrence

    2018-06-01

    Dams construction and operations have many benefits, nevertheless, they have also led to lots of negative social, health and human impacts. It is based on this that this study assesses the potential and socio-economics dynamics of Oyan dam between 1980 and 2016. The data used for this study include water level and discharge records of the dam between 2007 and 2016, Landsat imageries of 1984 and 2016 and socio-economic datasets for the period. Analysis of the dam potentials (water supply, agriculture and hydropower) and socio-economic impacts of the dam were carried out using basic statistical tools, land use change anaysis and field survey using questionnaire, structured interview with major stakeholders and personal observation. The results revealed that the water level and storage of the Oyan dam had a relative reduction of about 2 % as well as non-stationarity pattern of water abstraction and production for the period. The landuse classes show all classes decreased in extent except the cultivated landuse that acrued an increased of 19.9 % between 1984 and 2016. Furthermore, commercial water supply varied significantly between 2010 and 2016 while irrigation scheme is grossly under-utilized from the inception in 1983 to 2016. Finally, the result of socio-economic impacts revealed that majority of the selected communities' members are actually not benefiting from the dam and their livelihoods are not from the dam.

  14. Maternal obesity characterized by gestational diabetes increases the susceptibility of rat offspring to hepatic steatosis via a disrupted liver metabolome

    PubMed Central

    Pereira, Troy J; Fonseca, Mario A; Campbell, Kristyn E; Moyce, Brittany L; Cole, Laura K; Hatch, Grant M; Doucette, Christine A; Klein, Julianne; Aliani, Michel; Dolinsky, Vernon W

    2015-01-01

    Maternal obesity is associated with a high risk for gestational diabetes mellitus (GDM), which is a common complication of pregnancy. The influence of maternal obesity and GDM on the metabolic health of the offspring is poorly understood. We hypothesize that GDM associated with maternal obesity will cause obesity, insulin resistance and hepatic steatosis in the offspring. Female Sprague-Dawley rats were fed a high-fat (45%) and sucrose (HFS) diet to cause maternal obesity and GDM. Lean control pregnant rats received low-fat (LF; 10%) diets. To investigate the interaction between the prenatal environment and postnatal diets, rat offspring were assigned to LF or HFS diets for 12 weeks, and insulin sensitivity and hepatic steatosis were evaluated. Pregnant GDM dams exhibited excessive gestational weight gain, hyperinsulinaemia and hyperglycaemia. Offspring of GDM dams gained more weight than the offspring of lean dams due to excess adiposity. The offspring of GDM dams also developed hepatic steatosis and insulin resistance. The postnatal consumption of a LF diet did not protect offspring of GDM dams against these metabolic disorders. Analysis of the hepatic metabolome revealed increased diacylglycerol and reduced phosphatidylethanolamine in the offspring of GDM dams compared to offspring of lean dams. Consistent with altered lipid metabolism, the expression of CTP:phosphoethanolamine cytidylyltransferase, and peroxisomal proliferator activated receptor-α mRNA was reduced in the livers of GDM offspring. GDM exposure programs gene expression and hepatic metabolite levels and drives the development of hepatic steatosis and insulin resistance in young adult rat offspring. Key points Gestational diabetes mellitus is a common complication of pregnancy, but its effects on the offspring are poorly understood. We developed a rat model of diet-induced gestational diabetes mellitus that recapitulates many of the clinical features of the disease, including excessive gestational weight gain, glucose intolerance, hyperinsulinaemia and mild hyperglycaemia. Compared to the offspring of lean dams, exposure to gestational diabetes mellitus during the prenatal period resulted in obesity, hepatic steatosis and insulin resistance in young rat offspring that consumed a postnatal diet that was low in fat. The combination of maternal gestational diabetes mellitus and the postnatal consumption of a high-fat diet by the offspring caused a more severe metabolic phenotype. Metabolomic profiling of the liver tissues of the offspring of gestational diabetic dams revealed accumulation of lipotoxic lipids and reduced phosphatidylethanolamine levels compared to the offspring of lean dams. The results establish that gestational diabetes mellitus is a driver of hepatic steatosis and insulin resistance in the offspring. PMID:25922055

  15. Sediment Budgeting in Dam-Affected Rivers: Assessing the Influence of Damming, Tributaries, and Alluvial Valley Sediment Storage on Sediment Regimes

    NASA Astrophysics Data System (ADS)

    Wilcox, A. C.; Dekker, F. J.; Riebe, C. S.

    2014-12-01

    Although sediment supply is recognized as a fundamental driver of fluvial processes, measuring how dams affect sediment regimes and incorporating such knowledge into management strategies remains challenging. To determine the influences of damming, tributary supply, and valley morphology and sediment storage on downstream sediment supply in a dryland river, the Bill Williams River (BWR) in western Arizona, we measured basin erosion rates using cosmogenic nuclide analysis of beryllium-10 (10Be) at sites upstream and downstream of a dam along the BWR, as well as from tributaries downstream of the dam. Riverbed sediment mixing calculations were used to test if the dam, which blocks sediment supply from the upper 85% of the basin's drainage area, increases the proportion of tributary sediment to residual upstream sediment in mainstem samples downstream of the dam. Erosion rates in the BWR watershed are more than twice as large in the upper catchment (136 t km-2 yr-1) than in tributaries downstream of Alamo Dam (61 t km-2 yr-1). Tributaries downstream of the dam have little influence on mainstem sediment dynamics. The effect of the dam on reducing sediment supply is limited, however, because of the presence of large alluvial valleys along the mainstem BWR downstream of the dam that store substantial sediment and mitigate supply reductions from the upper watershed. These inferences, from our 10Be derived erosion rates and mixing calculations, are consistent with field observations of downstream changes in bed material size, which suggest that sediment-deficit conditions are restricted to a 10 km reach downstream of the dam, and limited reservoir bathymetry data. Many studies have suggested that tributary sediment inputs downstream of dams play a key role in mitigating dam-induced sediment deficits, but here we show that in a dryland river with ephemeral tributaries, sediment stored in alluvial valleys can also play a key role and in some cases trumps the role of tributaries.

  16. National Dam Inspection Program. Big Elk Lake Dam (NDI I.D. PA-0056 DER I.D. 058-019) Susquehanna River Basin, Elk Lake Stream, Susquehanna County, Pennsylvania. Phase I Inspection Report.

    DTIC Science & Technology

    1981-03-19

    Drainage Area 2.88 square miles(") b. Discharge at Dam Site ( cfs ) Maximum known flood at dam site Unknown Outlet conduit at maximum pool Not...the spillway was determined to be 164 cfs , based on the available 2.7-foot freeboard relative to the crest of the embankment. The Big Elk Lake watershed...computer analysis are presented in Appendix D. The 100-year flood, determined according to the recommended procedure, was found to have a peak of 2290 cfs

  17. Hydraulics of embankment-dam breaching

    NASA Astrophysics Data System (ADS)

    Walder, J. S.; Iverson, R. M.; Logan, M.; Godt, J. W.; Solovitz, S.

    2012-12-01

    Constructed or natural earthen dams can pose hazards to downstream communities. Experiments to date on earthen-dam breaching have focused on dam geometries relevant to engineering practice. We have begun experiments with dam geometries more like those of natural dams. Water was impounded behind dams constructed at the downstream end of the USGS debris-flow flume. Dams were made of compacted, well-sorted, moist beach sand (D50=0.21 mm), 3.5 m from toe to toe, but varying in height from 0.5 to 1 m; the lower the dam, the smaller the reservoir volume and the broader the initially flat crest. Breaching was started by cutting a slot 30-40 mm wide and deep in the dam crest after filling the reservoir. Water level and pore pressure within the dam were monitored. Experiments were also recorded by an array of still- and video cameras above the flume and a submerged video camera pointed at the upstream dam face. Photogrammetric software was used to create DEMs from stereo pairs, and particle-image velocimetry was used to compute the surface-velocity field from the motion of tracers scattered on the water surface. As noted by others, breaching involves formation and migration of a knickpoint (or several). Once the knickpoint reaches the upstream dam face, it takes on an arcuate form whose continued migration we determined by measuring the onset of motion of colored markers on the dam face. The arcuate feature, which can be considered the head of the "breach channel", is nearly coincident with the transition from subcritical to supercritical flow; that is, it acts as a weir that hydraulically controls reservoir emptying. Photogenic slope failures farther downstream, although the morphologically dominant process at work, play no role at all in hydraulic control aside from rare instances in which they extend upstream so far as to perturb the weir, where the flow cross section is nearly self-similar through time. The domain downstream of the critical-flow section does influence the hydrograph in another way: the broader the initial dam crest, the longer the time before critical flow control is established. Flood duration is thus increased but peak discharge is decreased. Visual inspection and overhead videography reveal little turbidity in water pouring over the weir, implying that sediment there moves dominantly as bedload. Furthermore, underwater videography gives the overall impression that along the upstream dam face, erosion occurs without redeposition. Thus it would be a mistake to use empiricisms for equilibrium bedload transport to model erosion of the embankment. In mathematical terms, erosion rate cannot be backed out by calculating the divergence of transport rate; rather, transport rate should be regarded as the spatial integral of erosion rate. We use photogrammetry and motion of the colored markers to determine the erosion rate of the weir, and then infer shear stress at the weir by applying the van Rijn sediment-pickup function. Shear stress determined in this fashion is much less than what one calculates from the gradient of the energy head (an approach appropriate to steady flow). Shear stress inferred from the pickup-function calculation can serve as a constraint on computational fluid-dynamics models. Another constraint on such models, revealed by the underwater videography, is the upstream limit of sand movement, where bed shear stress equals the critical value for sand entrainment.

  18. Detecting fluid leakage of a reservoir dam based on streaming self-potential measurements

    NASA Astrophysics Data System (ADS)

    Song, Seo Young; Kim, Bitnarae; Nam, Myung Jin; Lim, Sung Keun

    2015-04-01

    Between many reservoir dams for agriculture in suburban area of South Korea, water leakage has been reported several times. The dam under consideration in this study, which is located in Gyeong-buk, in the south-east of the Korean Peninsula, was reported to have a large leakage at the right foot of downstream side of the reservoir dam. For the detection of the leakage, not only geological survey but also geophysical explorations have been made for precision safety diagnosis, since the leakage can lead to dam failure. Geophysical exploration includes both electrical-resistivity and self-potential surveys, while geological surveys water permeability test, standard penetration test, and sampling for undisturbed sample during the course of the drilling investigation. The geophysical explorations were made not only along the top of dam but also transverse the heel of dam. The leakage of water installations can change the known-heterogeneous structure of the dam body but also cause streaming spontaneous (self) potential (SP) anomaly, which can be detected by electrical resistivity and SP measurements, respectively. For the interpretation of streaming SP, we used trial-and-error method by comparing synthetic SP data with field SP data for model update. For the computation, we first invert the resistivity data to obtain the distorted resistivity structure of the dam levee then make three-dimensional electrical-resistivity modeling for the streaming potential distribution of the dam levee. Our simulation algorithm of streaming SP distribution based on the integrated finite difference scheme computes two-dimensional (2D) SP distribution based on the distribution of calculated flow velocities of fluid for a given permeability structure together with physical properties. This permeability is repeatedly updated based on error between synthetic and field SP data, until the synthetic data match the field data. Through this trial-and-error-based SP interpretation, we locate the leakage of reservoir-water formed locally inside the levee body of the reservoir dam within the limitation due to the 2D nature of stream SP simulation.

  19. Compliance Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at The Dalles Dam, Spring 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carlson, Thomas J.; Skalski, John R.

    2010-10-01

    The purpose of this compliance study was to estimate dam passage survival of yearling Chinook salmon and steelhead smolts at The Dalles Dam during spring 2010. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated smolt passage survival from the forebay boat-restricted zone (BRZ) to the tailrace BRZ at The Dalles Dam, as well as the forebay residence time, tailrace egress, and spill passage efficiency (SPE), as required in themore » Columbia Basin Fish Accords. A virtual/paired-release design was used to estimate dam passage survival at The Dalles Dam. The approach included releases of acoustic-tagged smolts above John Day Dam that contributed to the formation of a virtual release at the face of The Dalles Dam. A survival estimate from this release was adjusted by a paired release below The Dalles Dam. A total of 4,298 yearling Chinook salmon and 4,309 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation. The dam passage survival results are summarized as follows: Yearling Chinook Salmon 0.9641 (SE = 0.0096) and Steelhead 0.9535 (SE = 0.0097).« less

  20. Breeding, husbandry, veterinary care, and hematology of marsh rice rats (Oryzomys palustris), a small animal model for periodontitis.

    PubMed

    Aguirre, J Ignacio; Edmonds, Kent; Zamora, Bernadette; Pingel, Jennifer; Thomas, Linda; Cancel, Denisse; Schneider, Laura; Reinhard, Mary K; Battles, August H; Akhter, Mohammed P; Kimmel, Donald B; Wronski, Thomas J

    2015-01-01

    Rice rats (Oryzomys palustris) are a recognized animal model for studying periodontal disease and the photoperiodic regulation of reproduction. Here we share information regarding the breeding, husbandry, veterinary care, and hematologic findings about this animal species to facilitate its use in studies at other research institutions. Rice rats initially were quarantined and monitored for excluded pathogens by using microbiologic, parasitologic, and serologic methods with adult female Mus musculus and Rattus norvegicus sentinel animals. Breeders were paired in a monogamous, continuous-breeding system. Rats were housed in static filter-top cages, maintained on commercial chow under 14:10-h light:dark cycles at 68 to 79 °F (20.0 to 26.1 °C) and 30% to 70% humidity. Rice rats apparently adapt relatively well to standard laboratory conditions, despite their aggressive behavior toward conspecifics and humans. Our analysis of 97 litters revealed that dams gave birth to an average of 5.2 pups per dam and weaned 4.2 pups per dam. Several procedures and biologic reagents normally used in standard laboratory rodents (mice and rats) can be used with rice rats. In addition, we present hematologic and serum chemistry values that can be used as preliminary reference values for future studies involving rice rats.

  1. Breeding, Husbandry, Veterinary Care, and Hematology of Marsh Rice Rats (Oryzomys palustris), a Small Animal Model for Periodontitis

    PubMed Central

    Aguirre, J Ignacio; Edmonds, Kent; Zamora, Bernadette; Pingel, Jennifer; Thomas, Linda; Cancel, Denisse; Schneider, Laura; Reinhard, Mary K; Battles, August H; Akhter, Mohammed P; Kimmel, Donald B; Wronski, Thomas J

    2015-01-01

    Rice rats (Oryzomys palustris) are a recognized animal model for studying periodontal disease and the photoperiodic regulation of reproduction. Here we share information regarding the breeding, husbandry, veterinary care, and hematologic findings about this animal species to facilitate its use in studies at other research institutions. Rice rats initially were quarantined and monitored for excluded pathogens by using microbiologic, parasitologic, and serologic methods with adult female Mus musculus and Rattus norvegicus sentinel animals. Breeders were paired in a monogamous, continuous-breeding system. Rats were housed in static filter-top cages, maintained on commercial chow under 14:10-h light:dark cycles at 68 to 79 °F (20.0 to 26.1 °C) and 30% to 70% humidity. Rice rats apparently adapt relatively well to standard laboratory conditions, despite their aggressive behavior toward conspecifics and humans. Our analysis of 97 litters revealed that dams gave birth to an average of 5.2 pups per dam and weaned 4.2 pups per dam. Several procedures and biologic reagents normally used in standard laboratory rodents (mice and rats) can be used with rice rats. In addition, we present hematologic and serum chemistry values that can be used as preliminary reference values for future studies involving rice rats. PMID:25651091

  2. Epidemiological models to control the spread of information in marine mammals.

    PubMed

    Schakner, Zachary A; Buhnerkempe, Michael G; Tennis, Mathew J; Stansell, Robert J; van der Leeuw, Bjorn K; Lloyd-Smith, James O; Blumstein, Daniel T

    2016-12-14

    Socially transmitted wildlife behaviours that create human-wildlife conflict are an emerging problem for conservation efforts, but also provide a unique opportunity to apply principles of infectious disease control to wildlife management. As an example, California sea lions (Zalophus californianus) have learned to exploit concentrations of migratory adult salmonids below the fish ladders at Bonneville Dam, impeding endangered salmonid recovery. Proliferation of this foraging behaviour in the sea lion population has resulted in a controversial culling programme of individual sea lions at the dam, but the impact of such culling remains unclear. To evaluate the effectiveness of current and alternative culling strategies, we used network-based diffusion analysis on a long-term dataset to demonstrate that social transmission is implicated in the increase in dam-foraging behaviour and then studied different culling strategies within an epidemiological model of the behavioural transmission data. We show that current levels of lethal control have substantially reduced the rate of social transmission, but failed to effectively reduce overall sea lion recruitment. Earlier implementation of culling could have substantially reduced the extent of behavioural transmission and, ultimately, resulted in fewer animals being culled. Epidemiological analyses offer a promising tool to understand and control socially transmissible behaviours. © 2016 The Author(s).

  3. Watershed restoration: planning and implementing small dam removals to maximize ecosystem services

    NASA Astrophysics Data System (ADS)

    Tonitto, C.; Riha, S. J.

    2016-12-01

    River restoration and enhancing watershed connectivity is of growing concern in industrialized nations. The past two decades have seen a number of small dam removals, though many removals remain unstudied and poorly documented. We summarize socio-economic and biophysical lessons learned during the past two decades of accelerated activity regarding small dam removals throughout the United States. We present frameworks for planning and implementing removals developed by interdisciplinary engagement. Toward the goal of achieving thorough dam removal planning, we present outcomes from well-documented small dam removals covering ecological, chemical, and physical change in rivers post-dam removal, including field observation and modeling methodologies. Guiding principles of a dam removal process should include: 1) stakeholder engagement to navigate the complexity of watershed landuse, 2) an impacts assessment to inform the planning process, 3) pre- and post-dam removal observations of ecological, chemical and physical properties, 4) the expectation that there are short- and long-term ecological dynamics with population recovery depending on whether dam impacts were largely related to dispersion or to habitat destruction, 5) an expectation that changes in watershed chemistry are dependent on sediment type, sediment transport and watershed landuse, and 6) rigorous assessment of physical changes resulting from dam removal, understanding that alteration in hydrologic flows, sediment transport, and channel evolution will shape ecological and chemical dynamics, and shape how stakeholders engage with the watershed.

  4. Geochemical discrimination of five pleistocene Lava-Dam outburst-flood deposits, western Grand Canyon, Arizona

    USGS Publications Warehouse

    Fenton, C.R.; Poreda, R.J.; Nash, B.P.; Webb, R.H.; Cerling, T.E.

    2004-01-01

    Pleistocene basaltic lava dams and outburst-flood deposits in the western Grand Canyon, Arizona, have been correlated by means of cosmogenic 3He (3Hec) ages and concentrations of SiO2, Na2O, K2O, and rare earth elements. These data indicate that basalt clasts and vitroclasts in a given outburst-flood deposit came from a common source, a lava dam. With these data, it is possible to distinguish individual dam-flood events and improve our understanding of the interrelations of volcanism and river processes. At least five lava dams on the Colorado River failed catastrophically between 100 and 525 ka; subsequent outburst floods emplaced basalt-rich deposits preserved on benches as high as 200 m above the current river and up to 53 km downstream of dam sites. Chemical data also distinguishes individual lava flows that were collectively mapped in the past as large long-lasting dam complexes. These chemical data, in combination with age constraints, increase our ability to correlate lava dams and outburst-flood deposits and increase our understanding of the longevity of lava dams. Bases of correlated lava dams and flood deposits approximate the elevation of the ancestral river during each flood event. Water surface profiles are reconstructed and can be used in future hydraulic models to estimate the magnitude of these large-scale floods.

  5. The role of beaver in shaping steelhead trout (Oncorhynchus mykiss) habitat complexity and thermal refugia in a central Oregon stream

    NASA Astrophysics Data System (ADS)

    Consolati, F.; Wheaton, J. M.; Neilson, B. T.; Bouwes, N.; Pollock, M. M.

    2012-12-01

    The incised and degraded habitat of Bridge Creek, tributary to the John Day River in central Oregon, is thought to be limiting the local population of ESA-listed steelhead trout (Oncorhynchus mykiss). Restoration efforts for this watershed are aimed to improve their habitat through reconnecting the channel with portions of its former floodplain (now terraces) to increase stream habitat complexity and the extent of riparian vegetation. This is being done via the installation of over a hundred beaver dam support (BDS) structures that are designed to either mimic beaver dams or support existing beaver dams. The overall objective of this study is to determine if the BDS structures have had an effect on stream channel habitat complexity and thermal refugia in selected sections of Bridge Creek. Analysis of stream temperature data in restoration treatment and control areas will show the effects of beaver dams on stream temperature. Analysis of aerial imagery and high resolution topographic data will exhibit how the number and types of geomorphic units have changed after the construction of beaver dams. Combined, the results of this research are aimed to increase our understanding of how beaver dams impact fish habitat and stream temperature.

  6. Endocrine-disruptor molecular responses, occurrence of intersex and gonado-histopathological changes in tilapia species from a tropical freshwater dam (Awba Dam) in Ibadan, Nigeria.

    PubMed

    Adeogun, Aina O; Onibonoje, Kolawole; Ibor, Oju R; Omiwole, Roseline A; Chukwuka, Azubuike V; Ugwumba, Alex O; Ugwumba, Adiaha A A; Arukwe, Augustine

    2016-05-01

    In the present study, the occurrence of endocrine disruptive responses in Tilapia species from Awba Dam has been investigated, and compared to a reference site (Modete Dam). The Awba Dam is a recipient of effluents from University of Ibadan (Nigeria) and several other anthropogenic sources. A total of 132 Tilapia species (Sarotherodon malenotheron (n=57 and 32, males and females, respectively) and Tilapia guineensis (n=23 and 20, males and females, respectively)) were collected from June to September 2014. At the reference site, samples of adult male and female S. melanotheron (48 males and 47 females) and T. guineensis (84 males and 27 females) were collected. Gonads were morphologically and histologically examined and gonadosomatic index (GSI) was calculated. Hepatic mRNA transcriptions of vitellogenin (Vtg) and zona radiata protein (Zrp) genes were analyzed using validated RT-qPCR. Significant increase in Vtg and Zrp transcripts were observed in male tilapias from Awba Dam, compared to males from the reference site. In addition, male tilapias from Awba Dam produced significantly higher Vtg and Zrp mRNA, compared to females in June and July. However, at the natural peak spawning period in August and September, females produced, significantly higher Vtg and Zrp mRNA, compared to males. Fish gonads revealed varying incidence of intersex with a striking presence of two (2) pairs of testes and a pair of ovary in S. melanotheron from Awba Dam. The entire fish population examined at Awba Dam showed a high prevalence of intersex (34.8%), involving phenotypic males and females of both species. Analysis of sediment contaminant levels revealed that As, Cd, Pb, Hg and Ni (heavy metals), monobutyltin cation, 4-iso-nonyphenol and PCB congeners (138, 153 and 180) were significantly higher in Awba Dam, compared to the reference site. Principal component analysis (PCA) showed that fish variables were positively correlated with sediment contaminant burden at Awba Dam, indicating that the observed endocrine disruptive responses are associated with contaminant concentrations. Overall, the occurrence of intersex and elevated expressions of Vtg and Zrp in male fish, suggest that the measured contaminants were eliciting severe endocrine disruptive effects in Awba Dam biota, which is an important source of domestic water supply and fisheries for the University of Ibadan community. Copyright © 2016 Elsevier B.V. All rights reserved.

  7. An experimental method to verify soil conservation by check dams on the Loess Plateau, China.

    PubMed

    Xu, X Z; Zhang, H W; Wang, G Q; Chen, S C; Dang, W Q

    2009-12-01

    A successful experiment with a physical model requires necessary conditions of similarity. This study presents an experimental method with a semi-scale physical model. The model is used to monitor and verify soil conservation by check dams in a small watershed on the Loess Plateau of China. During experiments, the model-prototype ratio of geomorphic variables was kept constant under each rainfall event. Consequently, experimental data are available for verification of soil erosion processes in the field and for predicting soil loss in a model watershed with check dams. Thus, it can predict the amount of soil loss in a catchment. This study also mentions four criteria: similarities of watershed geometry, grain size and bare land, Froude number (Fr) for rainfall event, and soil erosion in downscaled models. The efficacy of the proposed method was confirmed using these criteria in two different downscaled model experiments. The B-Model, a large scale model, simulates watershed prototype. The two small scale models, D(a) and D(b), have different erosion rates, but are the same size. These two models simulate hydraulic processes in the B-Model. Experiment results show that while soil loss in the small scale models was converted by multiplying the soil loss scale number, it was very close to that of the B-Model. Obviously, with a semi-scale physical model, experiments are available to verify and predict soil loss in a small watershed area with check dam system on the Loess Plateau, China.

  8. Hydrologic effects of hypothetical earthquake-caused floods below Jackson Lake, northwestern Wyoming

    USGS Publications Warehouse

    Glass, W.R.; Keefer, T.N.; Rankl, J.G.

    1976-01-01

    Jackson Lake, located in Grand Teton National Park, Wyoming, is in an area of seismic instability. There is a possibility of flooding in the Snake River downstream from Jackson Lake Dam in the event of a severe earthquake. Hypothetical floods were routed 38 miles (61 kilometers) downstream from the dam for three cases: (1) Instantaneous destruction of the dam outlet structure, (2) instantaneous destruction of the entire dam, and (3) for waves overtopping the dam without failure of the dam. In each case, a full reservoir was assumed. Hydrographs for outflow from the reservoir for the two cases of dam failure were developed utilizing an accelerated discharge due to the travel of a negative wave through the reservoir, and Muskingum storage routing. For the case of waves overtopping the dam, a 10-foot (3-meter) wave was assumed to be propagated from the upstream end of the reservori. A multiple-linearization technique was used to route the flow through the reach. The model was calibrated from U.S. Geological Survey streamflow records. Most extensive flooding and largest water velocities would occur if the entire dam were destroyed; floods for the other two cases were smaller. An inundation map was prepared from channel conveyance curves and profiles of the water surface. (Woodard-USGS)

  9. Evidence-based dentistry: analysis of dental anxiety scales for children.

    PubMed

    Al-Namankany, A; de Souza, M; Ashley, P

    2012-03-09

    To review paediatric dental anxiety measures (DAMs) and assess the statistical methods used for validation and their clinical implications. A search of four computerised databases between 1960 and January 2011 associated with DAMs, using pre-specified search terms, to assess the method of validation including the reliability as intra-observer agreement 'repeatability or stability' and inter-observer agreement 'reproducibility' and all types of validity. Fourteen paediatric DAMs were predominantly validated in schools and not in the clinical setting while five of the DAMs were not validated at all. The DAMs that were validated were done so against other paediatric DAMs which may not have been validated previously. Reliability was not assessed in four of the DAMs. However, all of the validated studies assessed reliability which was usually 'good' or 'acceptable'. None of the current DAMs used a formal sample size technique. Diversity was seen between the studies ranging from a few simple pictograms to lists of questions reported by either the individual or an observer. To date there is no scale that can be considered as a gold standard, and there is a need to further develop an anxiety scale with a cognitive component for children and adolescents.

  10. Evaluation of the Biological Effects of the Northwest Power Conservation Council's Mainstem Amendment on the Fisheries Upstream and Downstream of Libby Dam, Montana, 2007-2008 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sylvester, Ryan; Stephens, Brian; Tohtz, Joel

    2009-04-03

    A new project began in 2005 to monitor the biological and physical effects of improved operations of Hungry Horse and Libby Dams, Montana, called for by the Northwest Power and Conservation Council (NPCC) Mainstem Amendment. This operating strategy was designed to benefit resident fish impacted by hydropower and flood control operations. Under the new operating guidelines, July through September reservoir drafts will be limited to 10 feet from full pool during the highest 80% of water supply years and 20 feet from full pool during the lowest 20% of water supply (drought) years. Limits were also established on how rapidlymore » discharge from the dams can be increased or decreased depending on the season. The NPCC also directed the federal agencies that operate Libby and Hungry Horse Dams to implement a new flood control strategy (VARQ) and directed Montana Fish, Wildlife & Parks to evaluate biological responses to this operating strategy. The Mainstem Amendment operating strategy has not been fully implemented at the Montana dams as of June 2008 but the strategy will be implemented in 2009. This report highlights the monitoring methods used to monitor the effects of the Mainstem Amendment operations on fishes, habitat, and aquatic invertebrates upstream and downstream of Libby Dam. We also present initial assessments of data and the effects of various operating strategies on physical and biological components of the systems upstream and downstream of Libby Dam. Annual electrofishing surveys in the Kootenai River and selected tributaries, along with gill net surveys in the reservoir, are being used to quantify the impacts of dam operations on fish populations upstream and downstream of Libby Dam. Scales and otoliths are being used to determine the age structure and growth of focal species. Annual population estimates and tagging experiments provide estimates of survival and growth in the mainstem Kootenai River and selected tributaries. Radio telemetry will be used to validate an existing Instream Flow Incremental Methodology (IFIM) model developed for the Kootenai River and will also be used to assess the effect of changes in discharge on fish movements and habitat use downstream of Libby Dam. Passive integrated transponder (PIT) tags will be injected into rainbow, bull, and cutthroat trout throughout the mainstem Kootenai River and selected tributaries to provide information on growth, survival, and migration patterns in relation to abiotic and biotic variables. Model simulations (RIVBIO) are used to calculate the effects of dam operations on the wetted perimeter and benthic biomass in the Kootenai River below Libby Dam. Additional models (IFIM) will also be used to evaluate the impacts of dam operations on the amount of available habitat for different life stages of rainbow and bull trout in the Kootenai River.« less

  11. Storing and sharing water in sand rivers: a water balance modelling approach

    NASA Astrophysics Data System (ADS)

    Love, D.; van der Zaag, P.; Uhlenbrook, S.

    2009-04-01

    Sand rivers and sand dams offer an alternative to conventional surface water reservoirs for storage. The alluvial aquifers that make up the beds of sand rivers can store water with minimal evaporation (extinction depth is 0.9 m) and natural filtration. The alluvial aquifers of the Mzingwane Catchment are the most extensive of any tributaries in the Limpopo Basin. The lower Mzingwane aquifer, which is currently underutilised, is recharged by managed releases from Zhovhe Dam (capacity 133 Mm3). The volume of water released annually is only twice the size of evaporation losses from the dam; the latter representing nearly one third of the dam's storage capacity. The Lower Mzingwane valley currently support commercial agro-businesses (1,750 ha irrigation) and four smallholder irrigation schemes (400 ha with provision for a further 1,200 ha). In order to support planning for optimising water use and storage over evaporation and to provide for more equitable water allocation, the spreadsheet-based balance model WAFLEX was used. It is a simple and userfriendly model, ideal for use by institutions such as the water management authorities in Zimbabwe which are challenged by capacity shortfalls and inadequate data. In this study, WAFLEX, which is normally used for accounting the surface water balance, is adapted to incorporate alluvial aquifers into the water balance, including recharge, baseflow and groundwater flows. Results of the WAFLEX modelling suggest that there is surplus water in the lower Mzingwane system, and thus there should not be any water conflicts. Through more frequent timing of releases from the dam and maintaining the alluvial aquifers permanently saturated, less evaporation losses will occur in the system and the water resources can be better shared to provide more irrigation water for smallholder farmers in the highly resource-poor communal lands along the river. Sand dams are needed to augment the aquifer storage system and improve access to water. An alternative to the current scenario was modelled in WAFLEX: making fuller use of the alluvial aquifers upstream and downstream of Zhovhe Dam. These alluvial aquifers have an estimated average water storage capacity of 0.37 Mm3 km

  12. DAM Safety and Deformation Monitoring in Dams

    NASA Astrophysics Data System (ADS)

    Kalkan, Y.; Bilgi, S.; Potts, L.; Miiama, J.; Mahgoub, M.; Rahman, S.

    2013-12-01

    Water is the life and necessity to water is increasing day by day with respect to the World population, rising of living standards and destruction of nature. Thus, the importance of water and water structures have been increasing gradually. Dams are among the most important engineering structures used for water supplies, flood controls, agricultural purposes as well as drinking and hydroelectric power. There are about 150.000 large size dams in the World. Especially after the Second World War, higher and larger capacity dams have been constructed. Dams create certain risks like the other manmade structures. No one knows precisely how many dam failures have occurred in the World, whereas hundreds of dam failures have occurred throughout the U.S. history. Some basic physical data are very important for assessing the safety and performance of dams. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. These physical data are measured and monitored by the instruments and equipment. Dams and their surroundings have to be monitored by using essential methods at periodic time intervals in order to determine the possible changes that may occur over the time. Monitoring programs typically consist of; surveillance or visual observation. These programs on dams provide information for evaluating the dam's performance related to the design intent and expected changes that could affect the safety performance of the dam. Additionally, these programs are used for investigating and evaluating the abnormal or degrading performance where any remedial action is necessary. Geodetic and non-geodetic methods are used for monitoring. Monitoring the performance of the dams is critical for producing and maintaining the safe dams. This study provides some information, safety and the techniques about the deformation monitoring of the dams. Therefore, this study gives essential information about the dam safety and related analysis. Monitoring of dams is crucial since deformation might have occurred as a result of erosion, water load, hydraulic gradients, and water saturation. The case study is the deformation measurements of Ataturk Dam. This dam was constructed on Firat River and it has importance for providing drinking water, hydroelectric power and especially irrigation. In addition, brief information is given about this dam and the methods of geodetic and non-geodetic monitoring measurements applied by various disciplines. Geodetic monitoring methods are emphasized in this study. Some results have been obtained from this method for nearly seven years are presented in this work. In addition, some deformation predictions have been made especially for the cross sections where the maximum deformations took place.

  13. Route-Specific Passage Proportions and Survival Rates for Fish Passing through John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

    This report fulfills a request of the U.S. Army Engineer District, Portland, Oregon, to produce an interim report of estimates of route-specific fish passage proportions and survival rates for lower Columbia River dams in 2010 and 2011. The estimates are needed to update the Compass Model for the Columbia River Treaty and the new Biological Opinion before detail technical reports are published in late 2012. This report tabulates route-specific fish-passage proportions and survival rates for steelhead and Chinook salmon smolts passing through various sampled routes at John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011. Resultsmore » were compiled from analyses of data acquired in spring 2010 and 2011 studies that were specifically designed to estimate dam-passage and forebay-to-tailrace survival rates, travel time metrics, and spill passage efficiency, as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the Columbia Basin Fish Accords. The study designs allowed for estimation of route-specific fish passage proportions and survival rates as well as estimation of forebay-passage survival, all of which are summarized herein.« less

  14. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.

    2011-02-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. Themore » approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.« less

  15. Estimating and Comparing Dam Deformation Using Classical and GNSS Techniques

    PubMed Central

    Barzaghi, Riccardo; De Gaetani, Carlo Iapige

    2018-01-01

    Global Navigation Satellite Systems (GNSS) receivers are nowadays commonly used in monitoring applications, e.g., in estimating crustal and infrastructure displacements. This is basically due to the recent improvements in GNSS instruments and methodologies that allow high-precision positioning, 24 h availability and semiautomatic data processing. In this paper, GNSS-estimated displacements on a dam structure have been analyzed and compared with pendulum data. This study has been carried out for the Eleonora D’Arborea (Cantoniera) dam, which is in Sardinia. Time series of pendulum and GNSS over a time span of 2.5 years have been aligned so as to be comparable. Analytical models fitting these time series have been estimated and compared. Those models were able to properly fit pendulum data and GNSS data, with standard deviation of residuals smaller than one millimeter. These encouraging results led to the conclusion that GNSS technique can be profitably applied to dam monitoring allowing a denser description, both in space and time, of the dam displacements than the one based on pendulum observations. PMID:29498650

  16. Modeling Kelvin Wave Cascades in Superfluid Helium

    NASA Astrophysics Data System (ADS)

    Boffetta, G.; Celani, A.; Dezzani, D.; Laurie, J.; Nazarenko, S.

    2009-09-01

    We study two different types of simplified models for Kelvin wave turbulence on quantized vortex lines in superfluids near zero temperature. Our first model is obtained from a truncated expansion of the Local Induction Approximation (Truncated-LIA) and it is shown to possess the same scalings and the essential behaviour as the full Biot-Savart model, being much simpler than the later and, therefore, more amenable to theoretical and numerical investigations. The Truncated-LIA model supports six-wave interactions and dual cascades, which are clearly demonstrated via the direct numerical simulation of this model in the present paper. In particular, our simulations confirm presence of the weak turbulence regime and the theoretically predicted spectra for the direct energy cascade and the inverse wave action cascade. The second type of model we study, the Differential Approximation Model (DAM), takes a further drastic simplification by assuming locality of interactions in k-space via using a differential closure that preserves the main scalings of the Kelvin wave dynamics. DAMs are even more amenable to study and they form a useful tool by providing simple analytical solutions in the cases when extra physical effects are present, e.g. forcing by reconnections, friction dissipation and phonon radiation. We study these models numerically and test their theoretical predictions, in particular the formation of the stationary spectra, and closeness of numerics for the higher-order DAM to the analytical predictions for the lower-order DAM.

  17. Improved algorithms in the CE-QUAL-W2 water-quality model for blending dam releases to meet downstream water-temperature targets

    USGS Publications Warehouse

    Rounds, Stewart A.; Buccola, Norman L.

    2015-01-01

    Water-quality models allow water resource professionals to examine conditions under an almost unlimited variety of potential future scenarios. The two-dimensional (longitudinal, vertical) water-quality model CE-QUAL-W2, version 3.7, was enhanced and augmented with new features to help dam operators and managers explore and optimize potential solutions for temperature management downstream of thermally stratified reservoirs. Such temperature management often is accomplished by blending releases from multiple dam outlets that access water of different temperatures at different depths. The modified blending algorithm in version 3.7 of CE-QUAL-W2 allows the user to specify a time-series of target release temperatures, designate from 2 to 10 floating or fixed-elevation outlets for blending, impose minimum and maximum head and flow constraints for any blended outlet, and set priority designations for each outlet that allow the model to choose which outlets to use and how to balance releases among them. The modified model was tested with a variety of examples and against a previously calibrated model of Detroit Lake on the North Santiam River in northwestern Oregon, and the results compared well. These updates to the blending algorithms will allow more complicated dam-operation scenarios to be evaluated somewhat automatically with the model, with decreased need for multiple model runs or preprocessing of model inputs to fully characterize the operational constraints.

  18. Development of a Salmonella cross-protective vaccine for food animal production systems.

    PubMed

    Heithoff, Douglas M; House, John K; Thomson, Peter C; Mahan, Michael J

    2015-01-01

    Intensive livestock production is associated with increased Salmonella exposure, transmission, animal disease, and contamination of food and water supplies. Modified live Salmonella enterica vaccines that lack a functional DNA adenine methylase (Dam) confer cross-protection to a diversity of salmonellae in experimental models of murine, avian, ovine, and bovine models of salmonellosis. However, the commercial success of any vaccine is dependent upon the therapeutic index, the ratio of safety/efficacy. Herein, secondary virulence-attenuating mutations targeted to genes involved in intracellular and/or systemic survival were introduced into Salmonella dam vaccines to screen for vaccine candidates that were safe in the animal and the environment, while maintaining the capacity to confer cross-protective immunity to pathogenic salmonellae serotypes. Salmonella dam mgtC, dam sifA, and dam spvB vaccine strains exhibited significantly improved vaccine safety as evidenced by the failure to give rise to virulent revertants during the infective process, contrary to the parental Salmonella dam vaccine. Further, these vaccines exhibited a low grade persistence in host tissues that was associated with reduced vaccine shedding, reduced environmental persistence, and induction of cross-protective immunity to pathogenic serotypes derived from infected livestock. These data indicate that Salmonella dam double mutant vaccines are suitable for commercial applications against salmonellosis in livestock production systems. Reducing pre-harvest salmonellae load through vaccination will promote the health and productivity of livestock and reduce contamination of livestock-derived food products, while enhancing overall food safety. Copyright © 2014 Elsevier Ltd. All rights reserved.

  19. Challenges in understanding, modelling, and mitigating Lake Outburst Flood Hazard: experiences from Central Asia

    NASA Astrophysics Data System (ADS)

    Mergili, Martin; Schneider, Demian; Andres, Norina; Worni, Raphael; Gruber, Fabian; Schneider, Jean F.

    2010-05-01

    Lake Outburst Floods can evolve from complex process chains like avalanches of rock or ice that produce flood waves in a lake which may overtop and eventually breach glacial, morainic, landslide, or artificial dams. Rising lake levels can lead to progressive incision and destabilization of a dam, to enhanced ground water flow (piping), or even to hydrostatic failure of ice dams which can cause sudden outflow of accumulated water. These events often have a highly destructive potential because a large amount of water is released in a short time, with a high capacity to erode loose debris, leading to a powerful debris flow with a long travel distance. The best-known example of a lake outburst flood is the Vajont event (Northern Italy, 1963), where a landslide rushed into an artificial lake which spilled over and caused a flood leading to almost 2000 fatalities. Hazards from the failure of landslide dams are often (not always) fairly manageable: most breaches occur in the first few days or weeks after the landslide event and the rapid construction of a spillway - though problematic - has solved some hazardous situations (e.g. in the case of Hattian landslide in 2005 in Pakistan). Older dams, like Usoi dam (Lake Sarez) in Tajikistan, are usually fairly stable, though landsildes into the lakes may create floodwaves overtopping and eventually weakening the dams. The analysis and the mitigation of glacial lake outburst flood (GLOF) hazard remains a challenge. A number of GLOFs resulting in fatalities and severe damage have occurred during the previous decades, particularly in the Himalayas and in the mountains of Central Asia (Pamir, Tien Shan). The source area is usually far away from the area of impact and events occur at very long intervals or as singularities, so that the population at risk is usually not prepared. Even though potentially hazardous lakes can be identified relatively easily with remote sensing and field work, modeling and predicting of GLOFs (and also the outburst of landslide-dammed lakes) remains a challenge: • The knowledge about the onset of the process is often limited (bathymetry of the lakes, subsurface water, properties of dam (content of ice), type of dam breach, understanding of process chains and interactions). • The size of glacial lakes may change rapidly but continuously, and many lakes break out within a short time after their development. Continuous monitoring is therefore required to keep updated on the existing hazards. • Also the outburst of small glacial lakes may lead to significant debris floods or even debris flows if there is plenty of erodible material available. • The available modeling software packages are of limited suitability for lake outburst floods: e.g. software developed by the hydrological community is specialized to simulate (debris) floods with input hydrographs on moderately steep flow channels and with lower sediment loads. In contrast to this, programs for rapid mass movements are better suited on steeper slopes and sudden onset of the movement. The typical characteristics of GLOFs are in between and vary for different channel sections. In summary, the major bottlenecks remain in deriving realistic or worst case scenarios and predicting their magnitude and area of impact. This mainly concerns uncertainties in the dam break process, involved volumes, erosion rates, changing rheologies, and the limited capabilities of available software packages to simulate process interactions and transformations such as the development of a hyperconcentrated flow into a debris flow. In addition, many areas prone to lake outburst floods are located in developing countries with a limited scope of the threatened population for decision-making and limited resources for mitigation.

  20. Evaluation of the Three Gorges Dam project using multi-criteria analysis (MCA) based on a sustainable perspective

    NASA Astrophysics Data System (ADS)

    Han, Yue; Zheng, Wei; Guo, Junshan; Ma, Yihe; Ding, Junqi; Zhu, Lingkai; Che, Yongqiang; Zhang, Yanpeng

    2018-02-01

    Abstract . The Three Gorges dam of China is one of the largest and expensive hydropower projects of the world. The four main purposes of the project are flood control,energy production, improved navigation and fresh water supply. The dam project has been completed and running successfully with the potential benefits. However, this project is still a controversial issue among many environmentalists and socialists due to various impacts. This study focuses on the benefit and the impacts of the project, and also evaluates the performance of the project using multi-criteria analysis (MCA) approach from a sustainable perspective. Different sustainability criteria related with the dam project have been identified and used for the ranking and rating process. The final result of MCA comes with this scoring process and pairwise comparison, which evaluates the performance of the project considering different positive and negative aspects.

  1. Review of Selected Documents Related to Flooding at City of Salisbury Facilities on the Yadkin River Upstream from High Rock Dam, North Carolina, September 2007

    USGS Publications Warehouse

    Bales, Jerad D.

    2007-01-01

    This report documents a review of the hydraulic and sediment-transport models developed by the City of Salisbury, Alcoa Power Generating, Inc., and the Federal Energy Regulatory Commission to address issues of flooding and sedimentation in the vicinity of Salisbury's water-supply intake 19.4 miles upstream from High Rock Dam. The objective of the review was to determine if the modeling results submitted by Salisbury clearly demonstrate that the presence of High Rock Dam has led to an increase in water levels at Salisbury facilities or, conversely, if the documents of Alcoa Power Generating, Inc., demonstrate that High Rock Dam has not had an effect on water levels at Salisbury facilities. No new data were collected as a part of the review, and the models developed by involved parties were not tested during the review. Some historical discharge-measurement notes and previously published reports were checked as part of the review. The one-dimensional hydraulic modeling results submitted by Alcoa Power Generating, Inc., did not assess the effects of changes in bathymetry on changes in flood levels at Salisbury's facilities because pre-impoundment conditions were not simulated. Hydraulic modeling performed by consultants for the City of Salisbury seems to indicate that both the presence of the dam in the absence of any post-impoundment sedimentation and changes in bathymetry between pre-impoundment and 1997 conditions have resulted in increased water levels relative to pre-impoundment conditions at Salisbury facilities on the Yadkin River for a fairly wide range of flows. The degree to which the dam and the changes in bathymetry have affected flood levels at the Salisbury facilities relative to pre-impoundment conditions is open to discussion because of uncertainty in topographic/bathymetric data and the absence of calibration and sensitivity testing of the hydraulic models. None of the three hydraulic models appears to have been calibrated to or tested against measurements, and no sensitivity testing was reported. Sediment-transport modeling results submitted by the City of Salisbury were calibrated, well documented, and provide a good understanding of the expected growth of the sediment delta in the upper end of High Rock Lake. Simulations made using this model seem to have demonstrated that the presence of the dam and the growth of the delta have resulted in increases in water-surface elevations at Salisbury's facilities over a range of flows and that these increases are expected to increase through time if current conditions remain unchanged.

  2. Geodetic deformation monitoring at Pendidikan Diponegoro Dam

    NASA Astrophysics Data System (ADS)

    Yuwono, Bambang Darmo; Awaluddin, Moehammad; Yusuf, M. A.; Fadillah, Rizki

    2017-07-01

    Deformation monitoring is one indicator to assess the feasibility of Dam. In order to get the correct result of the deformation, it is necessary to determine appropriate deformation monitoring network and the observation data should be analyse and evaluated carefully. Measurement and analysis of deformation requires relatively accurate data and the precision is high enough, one of the observation method that used is GPS (Global Positioning System). The research was conducted at Pendidikan Undip Dams is Dam which is located in Tembang. Diponegoro Dam was built in 2013 and a volume of 50.86 m3 of water, inundation normal width of up to 13,500 m2. The main purpose of these building is not only for drainage but also for education and micro hydro power plant etc. The main goal of this reasearch was to monitor and analyze the deformation at Pendidikan Undip Dam and to determaine whether GPS measurement could meet accuracy requirement for dam deformation measurements. Measurements were made 2 times over 2 years, 2015 and 2016 using dual frequency GPS receivers with static methods and processed by Scientific Software GAMIT 10.6

  3. Modeling and sediment study in the watershed Medjerda, Tunisia

    NASA Astrophysics Data System (ADS)

    Kotti, Fatma; Mahé, Gil; Habaieb, Hamadi; Dieulin, Claudine; Hermassi, Taoufik

    2015-04-01

    Water projects have experienced a major expansion in the late 1980s, and we now have sufficient perspective to assess their actual performance and their socio-environmental impacts (Payan, 2007). This study focuses on the great watershed of Tunisia namely Medjerda which has an area of about 23,600 km2. In the main river of Medjerda some dams have been created for water retention: Sidi Salem Dam (the largest in the country), El Aroussia dam, and others on tributaries Mellegue Bouhertma, Siliana, Beni Mtir, Lakhemess and Kasseb. Since the construction of dams, essentially Sidi Salem and Siliana, the Medjerda river has undergone significant changes in morphology. The monitoring of the flow of the major hydrological stations in the pre-estuarine zone downstream from Sidi Salem dam is used to measure the impact of the constructions on hydrological regimes: reduction in average rates, reduction in volumes sold, altered seasonal pattern, and most of all reduction of the sediment transport, which the highest values are related to extreme events. In this context, the balance of sediment monitoring appears indispensable for the quantification of sediment transport at the outlet. Our approach is to calculate a specific flow rate relative to the area of the basin for every structure built in the Medjerda watershed, from the information available on transport and sedimentation rates known, combined with contours of each sub watershed. There are about ten dams spread throughout Medjerda watershed. The methodology is primarily developed for the Mellegue dam because we have at this station a long data set from 1955 until 2005. Other stations will be studied later on. The main objective of this study is to provide a series of annual variation of theoretical contributions. These calculated values will be compared with the actual measured sedimentary series. Two cores in the sediments of the pre-estuarine area are performed to determine past variability in sediment inputs over a time series than should be about one century. The cores' analysis results show a succession of sedimentary layers that likely correspond to different flood deposits that succeeded on this site, and especially the datation of the cores shows that the selected area is a very important deposition area. This sedimentary study will help estimate the sediment dynamics to major estuaries, which is poorly known for most of the rivers of Maghreb. The reduction of the sediment supply to the sea is tipped as a major factor to be taken into account for a better understanding of the dynamics of coastal areas in the context of global climate change and sea level rise. Keywords: sediment core, Medjerda watershed, dam, hydrology, modeling, Tunisia

  4. The Shock and Vibration Digest. Volume 18, Number 9

    DTIC Science & Technology

    1986-09-01

    microprocessors. ods for mobility measurements, methods for Modeling and computation of transient rotor analyzing mobility data, mathematical modeling...behavior and nonlinear fluid-film bearing from mobility data, and applications of modal behavior will be described. Sessions will be test results will be...Zoned Viscoelastic Analysis of the Response of Dams to Earth- soil, quakesR. Abascal, J. Dominguez V. Lotfi , N6 445 • . , .-e ’SJ. PP %-’ , Ph.D. Thesis

  5. JPRS Report, Science & Technology Europe

    DTIC Science & Technology

    1988-11-30

    Study of a Dam The dam for a reservoir is made by filling on the original soil, so it can be modeled with two types of material. The ... the structural and load symmetries it was enough to study a half model . Within the framework of the static study we determined the nodal movements...two symmetrical axes it was enough to study a quarter model of the dome. JPRS-EST-88-012 30

  6. Survival of migrating Atlantic salmon smolts through the Penobscot River, Maine: A pre-restoration assessment

    USGS Publications Warehouse

    Zydlewski, Joseph D.; Kinnison, Michael T.; Holbrook, Christopher M.

    2011-01-01

    Survival, distribution, and behavior of hatchery (n = 493) and naturally reared (n = 133) smolts of Atlantic salmon Salmo salar migrating through the Penobscot River and estuary in Maine were evaluated with acoustic telemetry in 2005 and 2006. Survival and use of a secondary migration path (the Stillwater Branch) were estimated with a multistate mark–recapture model. Higher rates of mortality per kilometer (range = 0.01–0.22) were observed near release sites and within reaches that contained three particular dams: Howland, West Enfield, and Milford dams. Estimated total survival of tagged hatchery smolts through entire individual reaches containing those dams ranged from 0.52 ( 0.18) to 0.94 ( 0.09), whereas survival through most of the reaches without dams exceeded 0.95. Of those smolts that survived to the Penobscot River–Stillwater Branch split at Marsh Island, most (≥74%) remained in the main stem around Marsh Island, where they experienced lower survival than fish that used the Stillwater Branch. Movement rates of hatchery-reared smolts were significantly lower through reaches containing dams than through reaches that lacked dams. Smolts arriving at dams during the day experienced longer delays than smolts arriving at night. Planned removal of two dams in this system is expected to enhance the passage of smolts through the main-stem corridor. However, the dams currently scheduled for removal (Great Works and Veazie dams) had less influence on smolt survival than some of the dams that will remain. This case study shows that by examining prerestoration migration dynamics throughout entire river systems rather than just in the vicinity of particular dams, tracking studies can help prioritize restoration efforts or predict the costs and benefits of future hydrosystem changes.

  7. Quantitative and Qualitative Geospatial Analysis of a Probable Catastrophic Dam Failure

    NASA Astrophysics Data System (ADS)

    Oduor, P. G.; Stenehjem, J.

    2011-12-01

    Geospatial techniques were used in assessing inundation extents that would occur in the event of a catastrophic failure of Fort Peck dam. Fort Peck dam, located in Montana, USA has a spillway design which under dam failure the crest is expected to reach Williston a major economic hub in North Dakota in 1.4 days with a peak elevation of 1891 ft (576.377 m) msl (mean sea level). In this study, we address flooding extents and impacts on establishments with respect to a peak elevation of 1891 ft. From this study, we can unequivocally state that the City of Williston will be significantly impacted if Fort Peck dam fails with almost all critical needs, for example, gasoline stations, emergency facilities and grocery stores completely inundated. A secondary catastrophic event may be tied to the primary economic activity in Williston, that is, oil rigs of which most lie on the pathway of an inadvertent flood crest. We also applied a Discrete Fourier Transformation (DFT), and Lomb-Scargle normalized periodogram analyses and fitting of Fort Peck dam reservoir level fluctuations to gauge (a) likelihood of the dam overtopping, and (b) anatomic life span. Whereas we found that inasmuch as the dam could be considered stable by directly analyzing other dams that have failed, there is still a lower likelihood of it to fail at a 99-232 years range from construction. There was lack of concomitancy between overtopping and dam failure rates.

  8. Identification of Natural Oscillation Modes for Purposes of Seismic Assessment and Monitoring of HPP Dams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuz’menko, A. P., E-mail: apkuzm@gmail.com; Saburov, S. V., E-mail: saburov58@yandex.ru

    2016-07-15

    The paper puts forward a method for processing data from detailed seismic assessments of HPP dams (dynamic tests). A detailed assessment (hundreds of observation points in dam galleries) is performed with consideration of operating dam equipment and the microseismic noise. It is shown that dynamic oscillation characteristics (natural oscillation frequencies and modes in the main dam axes, the velocities of propagation of elastic waves with given polarization, and so on.) can be determined with sufficient accuracy by using complex transfer functions and pulse characteristics. Monitoring data is processed using data from a detailed assessment, taking account of identified natural oscillationmore » modes and determined ranges of natural frequencies. The spectra of characteristic frequencies thus obtained are used to choose substitution models and estimate the elastic characteristics of the “dam – rock bed” construction system, viz., the modulus of elasticity (the Young modulus), the Poisson ratio, the dam section stiffness with respect to shear, tension and compression and the elastic characteristics of the rock foundation.« less

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. Themore » approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.« less

  10. 7. VIEW OF INCLINED OUTLET GATE WHEEL, STEM AND STEM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. VIEW OF INCLINED OUTLET GATE WHEEL, STEM AND STEM GUIDE (15' HARDESTY MODEL 115 GATE), LOOKING NORTHWEST - High Mountain Dams in Bonneville Unit, Marjorie Lake Dam, Wasatch National Forest, Kamas, Summit County, UT

  11. National Dam Safety Program. Wappingers Falls Dam (I.D. Number N.Y. 3, D.E.C. 613A), Hudson River Basin, Dutchess County, New York. Phase 1 Inspection Report

    DTIC Science & Technology

    1980-09-30

    Classification 2I e. Ownership 2f. Purpose of Dam 2 g. Design and Construction History 2h. Normal Operating Procedure 2 1.3 PERTINENT DATA 2 a. Drainage...4 2.2 SUBSURFACE INVESTIGATION 4 2.3 DAM AND APPURTENANT STRUCTURES 4 2.4 CONSTRUCTION RECORDS 4 2.5 OPERATION RECORDS 2.6 EVALUATION OF DATA 5 4...12 a. Visual Observations 12 b. Design and Construction Data 12 c. Stability Analysis 12 d. Operating Records 13 e. Post- Construction Changes 13 f

  12. The dam replacing gene product enhances Neisseria gonorrhoeae FA1090 viability and biofilm formation

    PubMed Central

    Kwiatek, Agnieszka; Bacal, Pawel; Wasiluk, Adrian; Trybunko, Anastasiya; Adamczyk-Poplawska, Monika

    2014-01-01

    Many Neisseriaceae do not exhibit Dam methyltransferase activity and, instead of the dam gene, possess drg (dam replacing gene) inserted in the leuS/dam locus. The drg locus in Neisseria gonorrhoeae FA1090 has a lower GC-pairs content (40.5%) compared to the whole genome of N. gonorrhoeae FA1090 (52%). The gonococcal drg gene encodes a DNA endonuclease Drg, with GmeATC specificity. Disruption of drg or insertion of the dam gene in gonococcal genome changes the level of expression of genes as shown by transcriptome analysis. For the drg-deficient N. gonorrhoeae mutant, a total of 195 (8.94% of the total gene pool) genes exhibited an altered expression compared to the wt strain by at least 1.5 fold. In dam-expressing N. gonorrhoeae mutant, the expression of 240 genes (11% of total genes) was deregulated. Most of these deregulated genes were involved in translation, DNA repair, membrane biogenesis and energy production as shown by cluster of orthologous group analysis. In vivo, the inactivation of drg gene causes the decrease of the number of live neisserial cells and long lag phase of growth. The insertion of dam gene instead of drg locus restores cell viability. We have also shown that presence of the drg gene product is important for N. gonorrhoeae FA1090 in adhesion, including human epithelial cells, and biofilm formation. Biofilm produced by drg-deficient strain is formed by more dispersed cells, compared to this one formed by parental strain as shown by scanning electron and confocal microscopy. Also adherence assays show a significantly smaller biomass of formed biofilm (OD570 = 0.242 ± 0.038) for drg-deficient strain, compared to wild-type strain (OD570 = 0.378 ± 0.057). Dam-expressing gonococcal cells produce slightly weaker biofilm with cells embedded in an extracellular matrix. This strain has also a five times reduced ability for adhesion to human epithelial cells. In this context, the presence of Drg is more advantageous for N. gonorrhoeae biology than Dam presence. PMID:25566225

  13. Modeling of snow avalanches for protection measures designing

    NASA Astrophysics Data System (ADS)

    Turchaninova, Alla; Lazarev, Anton; Loginova, Ekaterina; Seliverstov, Yuri; Glazovskaya, Tatiana; Komarov, Anton

    2017-04-01

    Avalanche protection structures such as dams have to be designed using well known standard engineering procedures that differ in different countries. Our intent is to conduct a research on structural avalanche protection measures designing and their reliability assessment during the operation using numerical modeling. In the Khibini Mountains, Russia, several avalanche dams have been constructed at different times to protect settlements and mining. Compared with other mitigation structures dams are often less expensive to construct in mining regions. The main goal of our investigation was to test the capabilities of Swiss avalanche dynamics model RAMMS and Russian methods to simulate the interaction of avalanches with mitigation structures such as catching and reflecting dams as well as to reach the observed runout distances after the transition through a dam. We present the RAMMS back-calculation results of an artificially triggered and well-documented catastrophic avalanche occurred in the town of Kirovsk, Khibini Mountains in February 2016 that has unexpectedly passed through a system of two catching dams and took the lives of 3 victims. The estimated volume of an avalanche was approximately 120,000 m3. For the calculation we used a 5 m DEM including catching dams generated from field measurements in summer 2015. We simulated this avalanche (occurred below 1000 m.a.s.l.) in RAMMS having taken the friction parameters (µ and ζ) from the upper altitude limit (above 1500 m.a.s.l.) from the table recommended for Switzerland (implemented into RAMMS) according to the results of our previous research. RAMMS reproduced the observed avalanche behavior and runout distance. No information is available concerning the flow velocity; however, calculated values correspond in general to the values measured in this avalanche track before. We applied RAMMS using an option of adding structures to DEM (including a dam in GIS) in other to test other operating catching dams in Khibini Mountains by different avalanche scenarios and discuss the technical procedure and obtained results. RAMMS results were compared with field observations data and values received with Russian well-known one dimensional avalanche models. In the Caucasus, Russia, new ski resorts are being under the development which is impossible without avalanche protection. The choice of the avalanche mitigation type has to be done by experts depending on many factors. Within the ski resort Arkhyz, Caucasus we implemented RAMMS into the procedure of the structural measures type decision making. RAMMS as well as Russian well-known one-dimensional models were used to calculate the key input parameters for structures designing. The calculation results were coupled with field observations data and historical records. Finally we suggested the avalanche protection plan for the area of interest. The interpretation of RAMMS simulations including mitigation structures has been made in order to assess the reliability of the proposed protection.

  14. A NEW SYSTEM TO MONITOR DATA ANALYSES AND RESULTS OF PHYSICS DATA VALIDATION BETWEEN PULSES AT DIII-D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    FLANAGAN,A; SCHACHTER,J.M; SCHISSEL,D.P

    2003-02-01

    A Data Analysis Monitoring (DAM) system has been developed to monitor between pulse physics analysis at the DIII-D National Fusion Facility (http://nssrv1.gat.com:8000/dam). The system allows for rapid detection of discrepancies in diagnostic measurements or the results from physics analysis codes. This enables problems to be detected and possibly fixed between pulses as opposed to after the experimental run has concluded thus increasing the efficiency of experimental time. An example of a consistency check is comparing the experimentally measured neutron rate and the expected neutron emission, RDD0D. A significant difference between these two values could indicate a problem with one ormore » more diagnostics, or the presence of unanticipated phenomena in the plasma. This new system also tracks the progress of MDSplus dispatched data analysis software and the loading of analyzed data into MDSplus. DAM uses a Java Servlet to receive messages, CLIPS to implement expert system logic, and displays its results to multiple web clients via HTML. If an error is detected by DAM, users can view more detailed information so that steps can be taken to eliminate the error for the next pulse.« less

  15. System to monitor data analyses and results of physics data validation between pulses at DIII-D

    NASA Astrophysics Data System (ADS)

    Flanagan, S.; Schachter, J. M.; Schissel, D. P.

    2004-06-01

    A data analysis monitoring (DAM) system has been developed to monitor between pulse physics analysis at the DIII-D National Fusion Facility (http://nssrv1.gat.com:8000/dam). The system allows for rapid detection of discrepancies in diagnostic measurements or the results from physics analysis codes. This enables problems to be detected and possibly fixed between pulses as opposed to after the experimental run has concluded, thus increasing the efficiency of experimental time. An example of a consistency check is comparing the experimentally measured neutron rate and the expected neutron emission, RDD0D. A significant difference between these two values could indicate a problem with one or more diagnostics, or the presence of unanticipated phenomena in the plasma. This system also tracks the progress of MDSplus dispatched data analysis software and the loading of analyzed data into MDSplus. DAM uses a Java Servlet to receive messages, C Language Integrated Production System to implement expert system logic, and displays its results to multiple web clients via Hypertext Markup Language. If an error is detected by DAM, users can view more detailed information so that steps can be taken to eliminate the error for the next pulse.

  16. Development of computational fluid dynamics--habitat suitability (CFD-HSI) models to identify potential passage--Challenge zones for migratory fishes in the Penobscot River

    USGS Publications Warehouse

    Haro, Alexander J.; Dudley, Robert W.; Chelminski, Michael

    2012-01-01

    A two-dimensional computational fluid dynamics-habitat suitability (CFD–HSI) model was developed to identify potential zones of shallow depth and high water velocity that may present passage challenges for five anadromous fish species in the Penobscot River, Maine, upstream from two existing dams and as a result of the proposed future removal of the dams. Potential depth-challenge zones were predicted for larger species at the lowest flow modeled in the dam-removal scenario. Increasing flows under both scenarios increased the number and size of potential velocity-challenge zones, especially for smaller species. This application of the two-dimensional CFD–HSI model demonstrated its capabilities to estimate the potential effects of flow and hydraulic alteration on the passage of migratory fish.

  17. Integrated hazard assessment of Cirenmaco glacial lake in Zhangzangbo valley, Central Himalayas

    NASA Astrophysics Data System (ADS)

    Wang, Weicai; Gao, Yang; Iribarren Anacona, Pablo; Lei, Yanbin; Xiang, Yang; Zhang, Guoqing; Li, Shenghai; Lu, Anxin

    2018-04-01

    Glacial lake outburst floods (GLOFs) have recently become one of the primary natural hazards in the Himalayas. There is therefore an urgent need to assess GLOF hazards in the region. Cirenmaco, a moraine-dammed lake located in the upstream portion of Zhangzangbo valley, Central Himalayas, has received public attention after its damaging 1981 outburst flood. Here, by combining remote sensing methods, bathymetric survey and 2D hydraulic modeling, we assessed the hazard posed by Cirenmaco in its current status. Inter-annual variation of Cirenmaco lake area indicates a rapid lake expansion from 0.10 ± 0.08 km2 in 1988 to 0.39 ± 0.04 km2 in 2013. Bathymetric survey shows the maximum water depth of the lake in 2012 was 115 ± 2 m and the lake volume was calculated to be 1.8 × 107 m3. Field geomorphic analysis shows that Cirenmaco glacial lake is prone to GLOFs as mass movements and ice and snow avalanches can impact the lake and the melting of the dead ice in the moraine can lower the dam level. HEC-RAS 2D model was then used to simulate moraine dam failure of the Cirenmaco and assess GLOF impacts downstream. Reconstruction of Cirenmaco 1981 GLOF shows that HEC-RAS can produce reasonable flood extent and water depth, thus demonstrate its ability to effectively model complex GLOFs. GLOF modeling results presented can be used as a basis for the implementation of disaster prevention and mitigation measures. As a case study, this work shows how we can integrate different methods to GLOF hazard assessment.

  18. Prenatal toxicity of cyanide in goats--a model for teratological studies in ruminants.

    PubMed

    Soto-Blanco, Benito; Górniak, Silvana L

    2004-09-15

    Although exposure to cyanogenic plants or cyanide during pregnancy has adverse effects, no teratological study with cyanide has been conducted in goats or any other ruminant. The objective of the present study was to evaluate the effects of the maternal exposure to potassium cyanide (KCN) during pregnancy on both dams and offspring and furthermore, to develop a model for prenatal toxicological studies in ruminants. Twenty-six pregnant goats were allocated into four groups and given 0, 1.0, 2.0, or 3.0mg KCN/kg body weight per day orally (administered via twice-daily gavage) from Day 24 of pregnancy to term. However, one control dam and another from the 3.0mg KCN/kg per day group were sacrificed on Day 120. At birth, the kids were examined carefully for gross abnormalities. Three months after birth, the male kids and one dam from each group were sacrificed for histopathological study. Although clinical signs of poisoning were observed in dams, cyanide treatment did not alter the length of gestation or the number of live kids. Two prognata kids were born in the 3.0mg KCN/kg group, and one dam from the same group aborted two fetuses. There were histological lesions only in the KCN-treated dam (and its fetuses) sacrificed on Day 120; these consisted of an increased number of resorption vacuoles of thyroid follicular colloid, and status spongiosis of nervous white matter. This study proposes a new animal model for teratogenic trials that could be important to evaluate the effects of chemicals throughout pregnancy in goats and potentially other ruminants.

  19. Relation between Streamflow of Swiftcurrent Creek, Montana, and the Geometry of Passage for Bull Trout (Salvelinus confluentus)

    USGS Publications Warehouse

    Auble, Gregor T.; Holmquist-Johnson, Christopher L.; Mogen, Jim T.; Kaeding, Lynn R.; Bowen, Zachary H.

    2009-01-01

    Operation of Sherburne Dam in northcentral Montana has typically reduced winter streamflow in Swiftcurrent Creek downstream of the dam and resulted in passage limitations for bull trout (Salvelinus confluentus). We defined an empirical relation between discharge in Swiftcurrent Creek between Sherburne Dam and the downstream confluence with Boulder Creek and fish passage geometry by considering how the cross-sectional area of water changed as a function of discharge at a set of cross sections likely to limit fish passage. With a minimum passage window of 15 x 45 cm, passage at the cross sections increased strongly with discharge over the range of 1.2 to 24 cfs. Most cross sections did not satisfy the minimum criteria at 1.2 cfs, 25 percent had no passage at 12.7 cfs, whereas at 24 cfs all but one of 26 cross sections had some passage and 90 percent had more than 3 m of width satisfying the minimum criteria. Sensitivity analysis suggests that the overall results are not highly dependent on exact dimensions of the minimum passage window. Combining these results with estimates of natural streamflow in the study reach further suggests that natural streamflow provided adequate passage at some times in most months and locations in the study reach, although not for all individual days and locations. Limitations of our analysis include assumptions about minimum passage geometry, measurement error, limitations of the cross-sectional model we used to characterize passage, the relation of Sherburne Dam releases to streamflow in the downstream study reach in the presence of ephemeral accretions, and the relation of passage geometry as we have measured it to fish responses of movement, stranding, and mortality, especially in the presence of ice cover.

  20. Longitudinal distribution of Chironomidae (Diptera) downstream from a dam in a neotropical river.

    PubMed

    Pinha, G D; Aviz, D; Lopes Filho, D R; Petsch, D K; Marchese, M R; Takeda, A M

    2013-08-01

    The damming of a river causes dangerous consequences on structure of the environment downstream of the dam, modifying the sediment composition, which impose major adjustments in longitudinal distribution of benthic community. The construction of Engenheiro Sérgio Motta Dam in the Upper Paraná River has caused impacts on the aquatic communities, which are not yet fully known. This work aimed to provide more information about the effects of this impoundment on the structure of Chironomidae larvae assemblage. The analysis of data of physical and chemical variables in relation to biological data of 8 longitudinal sections in the Upper Paraná River showed that composition of Chironomidae larvae of stations near Engenheiro Sérgio Motta Dam differed of the other stations (farther of the Dam). The predominance of coarse sediments at stations upstream and finer sediments further downstream affected the choice of habitat by different morphotypes of Chironomidae and it caused a change in the structure of this assemblage in the longitudinal stretch.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    White Oak Dam is located in the White Oak Creek watershed which provides the primary surface drainage for Oak Ridge National Laboratory. A stability analysis was made on the dam by Syed Ahmed in January 1994 which included an evaluation of the liquefaction potential of the embankment and foundation. This report evaluates the stability of the dam and includes comments on the report prepared by Ahmed. Slope stability analyses were performed on the dam and included cases for sudden drawdown, steady seepage, partial pool and earthquake. Results of the stability analyses indicate that the dam is stable and failure ofmore » the structure would not occur for the cases considered. The report prepared by Ahmed leads to the same conclusions as stated above. Review of the report finds that it is complete, well documented and conservative in its selection of soil parameters. The evaluation of the liquefaction potential is also complete and this report is in agreement with the findings that the dam and foundation are not susceptible to liquefaction.« less

  2. Risk-informed Management of Water Infrastructure in the United States: History, Development, and Best Practices

    NASA Astrophysics Data System (ADS)

    Wolfhope, J.

    2017-12-01

    This presentation will focus on the history, development, and best practices for evaluating the risks associated with the portfolio of water infrastructure in the United States. These practices have evolved from the early development of the Federal Guidelines for Dam Safety and the establishment of the National Dam Safety Program, to the most recent update of the Best Practices for Dam and Levee Risk Analysis jointly published by the U.S. Department of Interior Bureau of Reclamation and the U.S. Army Corps of Engineers. Since President Obama signed the Water Infrastructure Improvements for the Nation Act (WIIN) Act, on December 16, 2016, adding a new grant program under FEMA's National Dam Safety Program, the focus has been on establishing a risk-based priority system for use in identifying eligible high hazard potential dams for which grants may be made. Finally, the presentation provides thoughts on the future direction and priorities for managing the risk of dams and levees in the United States.

  3. Evaluation of stream flow effects on smolt survival in the Yakima River Basin, Washington, 2012-2014

    USGS Publications Warehouse

    Courter, Ian; Garrison, Tommy; Kock, Tobias J.; Perry, Russell W.

    2015-01-01

    The influence of stream flow on survival of emigrating juvenile (smolts) Pacific salmon Oncorhynchus spp. and steelhead trout O. mykiss is of key management interest. However, few studies have quantified flow effects on smolt migration survival, and available information does not indicate a consistent flow-survival relationship within the typical range of flows under management control. It is hypothesized that smolt migration and dam passage survival are positively correlated with stream flow because higher flows increase migration rates, potentially reducing exposure to predation, and reduce delays in reservoirs. However, available empirical data are somewhat equivocal concerning the influence of flow on smolt survival and the underlying mechanisms driving this relationship. Stream flow effects on survival of emigrating anadromous salmonids in the Yakima Basin have concerned water users and fisheries managers for over 20 years, and previous studies do not provide sufficient information at the resolution necessary to inform water operations, which typically occur on a small spatiotemporal scale. Using a series of controlled flow releases from 2012-2014, combined with radio telemetry, we quantified the relationship between flow and smolt survival from Roza Dam 208 km downstream to the Yakima River mouth, as well as for specific routes of passage at Roza Dam. A novel multistate mark-recapture model accounted for weekly variation in flow conditions experienced by radio-tagged fish. Groups of fish were captured and radio-tagged at Roza Dam and released at two locations, upstream at the Big Pines Campground (river kilometer [rkm] 211) and downstream in the Roza Dam tailrace (rkm 208). A total of 904 hatchery-origin yearling Chinook salmon O. tshawytscha were captured in the Roza Dam fish bypass, radio-tagged and released upstream of Roza Dam. Two hundred thirty seven fish were released in the tailrace of Roza Dam. Fish released in the tailrace of Roza Dam were tagged concurrently with fish released upstream of the dam using identical tagging methods. Tagging and release events were conducted to target a range of flow conditions indicative of flows observed during the typical migration period (March-May) for juvenile spring Chinook salmon in the Yakima River. Three, five and four separate upstream releases were conducted in 2012, 2013, and 2014 respectively, and at least 43 fish were released alive on each occasion. The release sample sizes in 2014 were much larger (~130) compared to previous years for the purpose of increasing precision of survival estimates across the range of flows tested. Migration movements of radio-tagged spring Chinook salmon smolts were monitored with an array of telemetry receiver stations (fixed sites) that extended 208 rkm downstream from the forebay of Roza Dam to the mouth of the Yakima River. Fixed monitoring sites included the forebay of Roza Dam (rkm 208), the tailrace of Roza Dam (rkm 207.9), the mouth of Wenas Creek (rkm 199.2), the mouth of the Naches River (two sites, rkm 189.4), Sunnyside Dam (two sites, rkm 169.1), Prosser Dam (rkm 77.2), and the mouth of the Yakima River (two sites, rkm2 3). This array segregated the study area into four discrete reaches in which survival of tagged fish was estimated. Aerial and underwater antennas were also used to monitor tagged fish at Roza Dam. Aerial antennas were located in the forebay, on the East gate, on the West gate, and in the tailrace of Roza Dam. Underwater antennas were located in the fish bypass, upstream of the East gate, and upstream of the West gate to collect route-specific passage data for tagged fish. Additional years of data collection and analysis could alter or improve our understanding of the influence of flow and other environmental factors on smolt survival in the Yakima River. Nevertheless, during 2012-2014, yearling hatchery Chinook salmon smolt emigration survival was significantly associated with stream flow in the

  4. Physical modeling of stepped spillways

    USDA-ARS?s Scientific Manuscript database

    Stepped spillways applied to embankment dams are becoming popular for addressing the rehabilitation of aging watershed dams, especially those situated in the urban landscape. Stepped spillways are typically placed over the existing embankment, which provides for minimal disturbance to the original ...

  5. 5. VIEW OF INCLINED OUTLET GATE WHEEL, STEM AND STEM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. VIEW OF INCLINED OUTLET GATE WHEEL, STEM AND STEM GUIDE, (12' DIAMETER HARDESTY MODEL 112 CIRCULAR GATE), LOOKING NORTHEAST - High Mountain Dams in Bonneville Unit, Island Lake Dam, Wasatch National Forest, Kamas, Summit County, UT

  6. Seasonal forecasting for water resource management: the example of CNR Genissiat dam on the Rhone River in France

    NASA Astrophysics Data System (ADS)

    Dommanget, Etienne; Bellier, Joseph; Ben Daoud, Aurélien; Graff, Benjamin

    2014-05-01

    Compagnie Nationale du Rhône (CNR) has been granted the concession to operate the Rhone River from the Swiss border to the Mediterranean Sea since 1933 and carries out three interdependent missions: navigation, irrigation and hydropower production. Nowadays, CNR generates one quarter of France's hydropower electricity. The convergence of public and private interests around optimizing the management of water resources throughout the French Rhone valley led CNR to develop hydrological models dedicated to discharge seasonal forecasting. Indeed, seasonal forecasting is a major issue for CNR and water resource management, in order to optimize long-term investments of the produced electricity, plan dam maintenance operations and anticipate low water period. Seasonal forecasting models have been developed on the Genissiat dam. With an installed capacity of 420MW, Genissiat dam is the first of the 19 CNR's hydropower plants. Discharge forecasting at Genissiat dam is strategic since its inflows contributes to 20% of the total Rhone average discharge and consequently to 40% of the total Rhone hydropower production. Forecasts are based on hydrological statistical models. Discharge on the main Rhone River tributaries upstream Genissiat dam are forecasted from 1 to 6 months ahead thanks to multiple linear regressions. Inputs data of these regressions are identified depending on river hydrological regimes and periods of the year. For the melting season, from spring to summer, snow water equivalent (SWE) data are of major importance. SWE data are calculated from Crocus model (Météo France) and SLF's model (Switzerland). CNR hydro-meteorological forecasters assessed meteorological trends regarding precipitations for the next coming months. These trends are used to generate stochastically precipitation scenarios in order to complement regression data set. This probabilistic approach build a decision-making supports for CNR's water resource management team and provides them with seasonal forecasts and their confidence interval. After a presentation of CNR methodology, results for the years 2011 and 2013 will illustrate CNR's seasonal forecasting models ability. These years are of particular interest regarding water resource management seeing that they are, respectively, unusually dry and snowy. Model performances will be assessed in comparison with historical climatology thanks to CRPS skill score.

  7. Impact of Watershed Development on Sediment Transport and Seasonal Flooding in the Main Stream of the Mekong River

    NASA Astrophysics Data System (ADS)

    Kameyama, S.; Nohara, S.; Sato, T.; Fujii, Y.; Kudo, K.

    2009-12-01

    The Mekong River watershed is undergoing rapid economic progress and population growth, raising conflicts between watershed development and environmental conservation. A typical conflict is between the benefits of dam construction versus the benefits of watershed ecological services. In developed countries, this conflict is changing to a coordinated search for outcomes that are mutually acceptable to all stakeholders. In the Mekong River, however, government policy gives priority to watershed development for ensuring steady energy supplies. Since the 1990s, a series of dams called “the Mekong Cascade” have been under construction. Dam construction has multiple economic values as electric power supply, irrigation water, flood control, etc. On the other hand, the artificial flow discharge controls of dam moderate seasonal hydrologic patterns of the Asian monsoon region. Dam operations can change the sediment transport regime and river structure. Furthermore, their impacts on watershed ecosystems and traditional economic activities of fisheries and agriculture in downstream areas may be severe. We focus on dam impacts on spatio-temporal patterns of sediment transport and seasonal flood in riparian areas downstream from Mekong River dams. Our study river section is located on 100 km down stream from the Golden Triangle region of Myanmar, Laos, and Thailand. We selected a 10-km section in this main channel to simulate seasonal flooding. We modeled the river hydrology in the years 1991 and 2002, before and after the Manwan dam construction (1986-1993). For this simulation, we adapted three models (distributed runoff model, 1-D hydrological model, and 2-D flood simulation with sediment movement algorithm.) Input data on river structure, water velocity, and flow volume were acquired from field survey data in November 2007 and 2008. In the step of parameter decision, we adopted the shuffled complex evolution method. To validate hydrologic parameters, we used annual water level data observed in Chiang Sean and Luang Prabang. To calculate sediment flux volume, we employed a Load-Quantity equation using total suspended solids data from monthly water sampling and flow discharge volumes over 13 months. To evaluate the impact of dam construction and watershed development, we inputted the same year of precipitation data using two watershed conditions with different parameters. Our results from the 1-D model displayed a seasonal delay of water flooding time after summer rainy season and an increase in sediment transport volume from September to October. In the flood simulation by the 2-D model, most of the annual sediment transport was concentrated from July to October. The spatial pattern of sediment dynamics was dependent largely on river structure including river meander shape, river bottom elevation, and geometry of the riparian zone. Our study approaches and simulation results show promise for beginning a quantitative assessment approach to cross-boundary environmental issues in the Mekong River watershed.

  8. Geomorphic Response to Two Lowhead Dam Removals in a Mid-Sized Urban River System, Columbus, Ohio, USA: Export of Impounded Reservoir Sediments Results in Upstream Coarsening and Moderate Increases in Downstream Bathymetric Heterogeneity

    NASA Astrophysics Data System (ADS)

    Comes, E.; Jaeger, K. L.

    2016-12-01

    Lowhead dams have had a profound cumulative impact on rivers and streams. Their removal is an increasingly popular restoration method, however, geomorphic response remains poorly resolved. This study quantified geomorphic change following two lowhead dam removal in the Olentangy River and the downstream Scioto River, which flows through Columbus, Ohio. A paired control-treatment design compared change above and below a removed dam (treatment) to an existing dam (control) in each river system over a two and three-year period. Upstream treatment reaches included passive and active restoration via in-channel engineering. Channel change was quantified through repeat bathymetric surveys using an acoustic Doppler current profiles and near-surface riverbed substrate sampling at several time periods ( 2 surveys/year). Differencing of digital elevation models from each bathymetric survey quantified changes in erosion and deposition patterns and bathymetric heterogeneity. Results indicate upstream treatment reaches were net erosional with overall substrate coarsening that included D84 sand to gravel clast size shifts. The Olentangy River's downstream treatment reach experienced concurrent erosion and deposition within a given survey although net erosion dominated the first year of the three-year study period. The downstream treatment reach also experienced substantial grain size fluctuation between surveys with little overall change. Unanticipated engineering activities in the downstream treatment reach of the Scioto River confounded geomorphic change in this reach. Non-metric multidimensional scaling analysis indicates a moderate, but abrupt change towards overall increased heterogeneity in the first year following dam removal in the downstream reach with little overall change in the following two years. Active restoration activities in the upstream treatment reach resulted in abrupt, but slight shifts towards decreased bathymetric heterogeneity despite substantial riverbed regrading to create pool-riffle features. Repeat intra-annual surveys revealed that the river system experiences clear seasonal patterns of erosion and deposition with associated substrate coarsening and fining that would not be evident in typical dam removal studies that generally are limited to annual surveys.

  9. Near‐surface evaluation of Ball Mountain Dam, Vermont, using multi‐channel analysis of surface waves (MASW) and refraction tomography seismic methods on land‐streamer data

    USGS Publications Warehouse

    Ivanov, Julian M.; Johnson, Carole D.; Lane, John W.; Miller, Richard D.; Clemens, Drew

    2009-01-01

    A limited seismic investigation of Ball Mountain Dam, an earthen dam near Jamaica, Vermont, was conducted using multiple seismic methods including multi‐channel analysis of surface waves (MASW), refraction tomography, and vertical seismic profiling (VSP). The refraction and MASW data were efficiently collected in one survey using a towed land streamer containing vertical‐displacement geophones and two seismic sources, a 9‐kg hammer at the beginning of the spread and a 40‐kg accelerated weight drop one spread length from the geophones, to obtain near‐ and far‐offset data sets. The quality of the seismic data for the purposes of both refraction and MASW analyses was good for near offsets, decreasing in quality at farther offsets, thus limiting the depth of investigation to about 12 m. Refraction tomography and MASW analyses provided 2D compressional (Vp) and shear‐wave (Vs) velocity sections along the dam crest and access road, which are consistent with the corresponding VSP seismic velocity estimates from nearby wells. The velocity sections helped identify zonal variations in both Vp and Vs (rigidity) properties, indicative of material heterogeneity or dynamic processes (e.g. differential settlement) at specific areas of the dam. The results indicate that refraction tomography and MASW methods are tools with significant potential for economical, non‐invasive characterization of construction materials at earthen dam sites.

  10. Converging stepped spillways: Simplified momentum analysis approach

    USDA-ARS?s Scientific Manuscript database

    Roller compacted concrete (RCC) stepped spillways are growing in popularity for providing overtopping protection for aging watershed dams with inadequate auxiliary spillway capacity and for the construction of new dams. Site conditions, such as limited right-of-way, topography, and geological forma...

  11. Detrimental effects of a novel flow regime on the functional trajectory of an aquatic invertebrate metacommunity.

    PubMed

    Ruhi, Albert; Dong, Xiaoli; McDaniel, Courtney H; Batzer, Darold P; Sabo, John L

    2018-04-17

    Novel flow regimes resulting from dam operations and overallocation of freshwater resources are an emerging consequence of global change. Yet, anticipating how freshwater biodiversity will respond to surging flow regime alteration requires overcoming two challenges in environmental flow science: shifting from local to riverscape-level understanding of biodiversity dynamics, and from static to time-varying characterizations of the flow regime. Here, we used time-series methods (wavelets and multivariate autoregressive models) to quantify flow-regime alteration and to link time-varying flow regimes to the dynamics of multiple local communities potentially connected by dispersal (i.e., a metacommunity). We studied the Chattahoochee River below Buford dam (Georgia, U.S.A.), and asked how flow regime alteration by a large hydropower dam may control the long-term functional trajectory of the downstream invertebrate metacommunity. We found that seasonal variation in hydropeaking synchronized temporal fluctuations in trait abundance among the flow-altered sites. Three biological trait states describing adaptation to fast flows benefitted from flow management for hydropower, but did not compensate for declines in 16 "loser" traits. Accordingly, metacommunity-wide functional diversity responded negatively to hydropeaking intensity, and stochastic simulations showed that the risk of functional diversity collapse within the next 4 years would decrease by 17% if hydropeaking was ameliorated, or by 9% if it was applied every other season. Finally, an analysis of 97 reference and 23 dam-affected river sites across the U.S. Southeast suggested that flow variation at extraneous, human-relevant scales (12-hr, 24-hr, 1-week) is relatively common in rivers affected by hydropower dams. This study advances the notion that novel flow regimes are widespread, and simplify the functional structure of riverine communities by filtering out taxa with nonadaptive traits and by spatially synchronizing their dynamics. This is relevant in the light of ongoing and future hydrologic alteration due to climate non-stationarity and the new wave of dams planned globally. © 2018 John Wiley & Sons Ltd.

  12. Migration depths of juvenile Chinook salmon and steelhead relative to total dissolved gas supersaturation in a Columbia River reservoir

    USGS Publications Warehouse

    Beeman, J.W.; Maule, A.G.

    2006-01-01

    The in situ depths of juvenile salmonids Oncorhynchus spp. were studied to determine whether hydrostatic compensation was sufficient to protect them from gas bubble disease (GBD) during exposure to total dissolved gas (TDG) supersaturation from a regional program of spill at dams meant to improve salmonid passage survival. Yearling Chinook salmon O. tshawytscha and juvenile steelhead O. mykiss implanted with pressure-sensing radio transmitters were monitored from boats while they were migrating between the tailrace of Ice Harbor Dam on the Snake River and the forebay of McNary Dam on the Columbia River during 1997-1999. The TDG generally decreased with distance from the tailrace of the dam and was within levels known to cause GBD signs and mortality in laboratory bioassays. Results of repeated-measures analysis of variance indicated that the mean depths of juvenile steelhead were similar throughout the study area, ranging from 2.0 m in the Snake River to 2.3 m near the McNary Dam forebay. The mean depths of yearling Chinook salmon generally increased with distance from Ice Harbor Dam, ranging from 1.5 m in the Snake River to 3.2 m near the forebay. Juvenile steelhead were deeper at night than during the day, and yearling Chinook salmon were deeper during the day than at night. The TDG level was a significant covariate in models of the migration depth and rates of each species, but no effect of fish size was detected. Hydrostatic compensation, along with short exposure times in the area of greatest TDG, reduced the effects of TDG exposure below those generally shown to elicit GBD signs or mortality. Based on these factors, our results indicate that the TDG limits of the regional spill program were safe for these juvenile salmonids.

  13. Factors Affecting Route Selection and Survival of Steelhead Kelts at Snake River Dams in 2012 and 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harnish, Ryan A.; Colotelo, Alison HA; Li, Xinya

    2014-12-01

    In 2012 and 2013, Pacific Northwest National Laboratory conducted a study that summarized the passage proportions and route-specific survival rates of steelhead kelts that passed through Federal Columbia River Power System (FCRPS) dams. To accomplish this, a total of 811 steelhead kelts were tagged with Juvenile Salmon Acoustic Telemetry System (JSATS) transmitters. Acoustic receivers, both autonomous and cabled, were deployed throughout the FCRPS to monitor the downstream movements of tagged-kelts. Kelts were also tagged with Passive Integrated Transponder tags to monitor passage through juvenile bypass systems and detect returning fish. The current study evaluated data collected in 2012 and 2013more » to identify individual, behavioral, environmental and dam operation variables that were related to passage and survival of steelhead kelts that passed through FCRPS dams. Bayesian model averaging of multivariable logistic regression models was used to identify the environmental, temporal, operational, individual, and behavioral variables that had the highest probability of influencing the route of passage and the route-specific survival probabilities for kelts that passed Lower Granite (LGR), Little Goose (LGS), and Lower Monumental (LMN) dams in 2012 and 2013. The posterior probabilities of the best models for predicting route of passage ranged from 0.106 for traditional spill at LMN to 0.720 for turbine passage at LGS. Generally, the behavior (depth and near-dam searching activity) of kelts in the forebay appeared to have the greatest influence on their route of passage. Shallower-migrating kelts had a higher probability of passing via the weir and deeper-migrating kelts had a higher probability of passing via the JBS and turbines than other routes. Kelts that displayed a higher level of near-dam searching activity had a higher probability of passing via the spillway weir and those that did less near-dam searching had a higher probability of passing via the JBS and turbines. The side of the river in which kelts approached the dam and dam operations also affected route of passage. Dam operations and the size and condition of kelts were found to have the greatest effect on route-specific survival probabilities for fish that passed via the spillway at LGS. That is, longer kelts and those in fair condition had a lower probability of survival for fish that passed via the spillway weir. The survival of spillway weir- and deep-spill passed kelts was positively correlated with the percent of the total discharge that passed through turbine unit 4. Too few kelts passed through the traditional spill, JBS, and turbine units to evaluate survival through these routes. The information gathered in this study describes Snake River steelhead kelt passage behavior, rates, and distributions through the FCRPS as well as provide information to biologists and engineers about the dam operations and abiotic conditions that are related to passage and survival of steelhead kelts.« less

  14. Assessing the Use of Sunken Lanes for Water Retention in a Landscape

    NASA Astrophysics Data System (ADS)

    Zlatuška, Karel

    2012-12-01

    Newly-designed structures and landscaping elements are often used for flood protection. This article assesses the use of existing sunken lanes for retaining water in a landscape and the sedimentation of washed-off soil. The article also describes ways how to preserve or, at least minimally disrupt, existing biotopes and landscape segments. Geodetic data from one specific sunken lane in South Moravia in the Czech Republic were transferred to a digital terrain model; 9 models were subsequently generated, each with a different longitudinal sunken lane bed slope. Retention dams consisting of gabions were placed in them. The number of dams, the volume of structures made of steel gabions, and the retention area volume behind the dams were determined for each model specifically. It was determined that the number of dams, as well as their total volume, increased with the average longitudinal slope of the sunken lane bed. It was also discovered that the retention volume remained almost the same, as it only very slightly decreases with an increasing longitudinal slope.

  15. Channel evolution on the dammed Elwha River, Washington, USA

    USGS Publications Warehouse

    Draut, A.E.; Logan, J.B.; Mastin, M.C.

    2011-01-01

    Like many rivers in the western U.S., the Elwha River, Washington, has changed substantially over the past century in response to natural and human forcing. The lower river is affected by two upstream dams that are slated for removal as part of a major river restoration effort. In preparation for studying the effects of dam removal, we present a comprehensive field and aerial photographic analysis of dam influence on an anabranching, gravel-bed river. Over the past century with the dams in place, loss of the upstream sediment supply has caused spatial variations in the sedimentary and geomorphic character of the lower Elwha River channel. Bed sediment is armored and better sorted than on the naturally evolving bed upstream of the dams. On time scales of flood seasons, the channel immediately below the lower dam is fairly stable, but progresses toward greater mobility downstream such that the lowermost portion of the river responded to a recent 40-year flood with bank erosion and bed-elevation changes on a scale approaching that of the natural channel above the dams. In general, channel mobility in the lowest 4 km of the Elwha River has not decreased substantially with time. Enough fine sediment remains in the floodplain that – given sufficient flood forcing – the channel position, sinuosity, and braiding index change substantially. The processes by which this river accesses new fine sediment below the dams (rapid migration into noncohesive banks and avulsion of new channels) allow it to compensate for loss of upstream sediment supply more readily than would a dammed river with cohesive banks or a more limited supply of alluvium. The planned dam removal will provide a valuable opportunity to evaluate channel response to the future restoration of natural upstream sediment supply.

  16. The effect of river damming on vegetation: is it always unfavourable? A case study from the River Tiber (Italy).

    PubMed

    Ceschin, Simona; Tombolini, Ilaria; Abati, Silverio; Zuccarello, Vincenzo

    2015-05-01

    River damming leads to strong hydromorphological alterations of the watercourse, consequently affecting river vegetation pattern. A multitemporal and spatial analysis of the dam effect on composition, structure and dynamic of the upstream vegetation was performed on Tiber River at Nazzano-dam (Rome). The main research questions were as follows: How does plant landscape vary over time and along the river? Where does the dam effect on vegetation end? How does naturalistic importance of the vegetation affected by damming change over time? Data collection was performed mapping the vegetation in aerial photos related to the period before (1944), during (1954) and after dam construction (1984, 2000). The plant landscape has significantly changed over time and along the river, particularly as a result of the dam construction (1953). The major vegetation changes have involved riparian forests and macrophytes. Dam effect on vegetation is evident up to 3 km, and gradually decreases along an attenuation zone for about another 3 km. Despite the fact that the damming has caused strong local hydromorphological modification of the river ecosystem transforming it into a sub-lacustrine habitat, it has also led to the formation of wetlands of considerable naturalistic importance. Indeed, in these man-made wetlands, optimal hydrological conditions have been created by favouring both the expansion of pre-existing riparian communities and the rooting of new aquatic communities, albeit typical of lacustrine ecosystems. Some of these plant communities have become an important food resource, refuge or nesting habitats for aquatic fauna, while others fall into category of Natura 2000 habitats. Therefore, river damming seems to have indirectly had a "favourable" effect for habitat conservation and local biodiversity.

  17. Stakeout surveys for check dams in gullied areas by using the FreeXSap photogrammetric method

    NASA Astrophysics Data System (ADS)

    Castillo, Carlos; Marín-Moreno, Víctor; Taguas, Encarnación V.

    2017-04-01

    Prior to any check dam construction work, it is necessary to carry out field stakeout surveys to define the layout of the dam series according to spacing criteria. While in expensive and complex settings, accurate measurement techniques might be justified (e.g. differential GPS), for small to medium-sized check dams typical of areas affected by gully erosion, simpler methodologies might be more cost-efficient. Innovative 3D photogrammetric techniques based on Structure-from-Motion (SfM) algorithms have proved to be useful across different geomorphological applications and have been successfully applied for gully assessment. In this communication, we present an efficient methodology consisting of the application of a free interface for photogrammetric reconstruction (FreeXSap) combined with simple distance measurements to obtain channel cross-sections determining the width and height of the check dam for a particular cross-section. We will illustrate its use for a hundred-meter-long gully under conventional agriculture in Córdoba (Spain). FreeXSap is an easy-to-use graphical user interface written in Matlab Code (Mathworks, 2016) for the reconstruction of 3D models from image sets taken with digital consumer-grade cameras. The SfM algorithms are based on MicMac scripts (Pierrot-Deseilligny and Cléry, 2011) along with routines specifically developed for the orientation, determination and geometrical analysis of cross-sections. It only requires the collection of a few pictures of a channel cross-section (normally below 5) by the camera operator to build an accurate 3D model, while a second operator holds a pole in vertical position (with the help of a bubble level attached to the pole) in order to provide orientation and scale for further processing. The spacing between check dams was determined using the head-to-toe rule by using a clinometer App on a Smartphone. In this work we will evaluate the results of the application of this methodology in terms of time and cost requirements and the capabilities and operation procedure of FreeXSap will be presented. This tool will be available for free download. REFERENCES Pierrot-Deseilligny, M and Cléry, I. APERO, an Open Source Bundle Adjusment Software for Automatic Calibration and Orientation of a Set of Images. Proceedings of the ISPRS Commission V Symposium, Image Engineering and Vision Metrology, Trento, Italy, 2-4 March 2011.

  18. An evaluation of the accuracy of modeled and computed streamflow time-series data for the Ohio River at Hannibal Lock and Dam and at a location upstream from Sardis, Ohio

    USGS Publications Warehouse

    Koltun, G.F.

    2015-01-01

    Streamflow hydrographs were plotted for modeled/computed time series for the Ohio River near the USGS Sardis gage and the Ohio River at the Hannibal Lock and Dam. In general, the time series at these two locations compared well. Some notable differences include the exclusive presence of short periods of negative streamflows in the USGS 15-minute time-series data for the gage on the Ohio River above Sardis, Ohio, and the occurrence of several peak streamflows in the USACE gate/hydropower time series for the Hannibal Lock and Dam that were appreciably larger than corresponding peaks in the other time series, including those modeled/computed for the downstream Sardis gage

  19. Soil occupation and atmospheric variations over Sobradinho Lake area. Part one: an observational analysis

    NASA Astrophysics Data System (ADS)

    Correia, M. F.; da Silva Dias, M. A. F.; da Silva Aragão, M. R.

    2006-11-01

    Sobradinho Lake lies in the São Francisco River Basin, in one of the most arid regions in Northeastern Brazil, within a land stretch categorized as the Lower-middle São Francisco, situated at about 40 km away from the municipality of Petrolina (09°23'S 40°30'W) in the state of Pernambuco. The dam, in its full capacity, consists of a lake of approximately 4,214 km2; 280 km in length, the width of which varies from 5 to 50 km. The dam storage capacity is that of 34.1 billion m3 of water. Being situated in a semi-arid region, the dam brought about significant development to local irrigated agriculture. The caatinga ecosystem has, for that matter, undergone considerable changes. Statistical analysis techniques applied to data collected before and after the filling of the lake, made it possible both to make an assessment of the impact of the dam construction on the region meteorology and to diagnose the variability of such an impact on environmental conditions. Results showed that the dam has brought about considerable changes to regional meteorology. The alterations were observed to be more significant as regards atmospheric humidity and wind speed.

  20. Displacements Study of an Earth Fill Dam Based on High Precision Geodetic Monitoring and Numerical Modeling.

    PubMed

    Acosta, Luis Enrique; de Lacy, M Clara; Ramos, M Isabel; Cano, Juan Pedro; Herrera, Antonio Manuel; Avilés, Manuel; Gil, Antonio José

    2018-04-27

    The aim of this paper is to study the behavior of an earth fill dam, analyzing the deformations determined by high precision geodetic techniques and those obtained by the Finite Element Method (FEM). A large number of control points were established around the area of the dam, and the measurements of their displacements took place during several periods. In this study, high-precision leveling and GNSS (Global Navigation Satellite System) techniques were used to monitor vertical and horizontal displacements respectively. Seven surveys were carried out: February and July 2008, March and July 2013, August 2014, September 2015 and September 2016. Deformations were predicted, taking into account the general characteristics of an earth fill dam. A comparative evaluation of the results derived from predicted (FEM) and observed deformations shows the differences on average being 20 cm for vertical displacements, and 6 cm for horizontal displacements at the crest. These differences are probably due to the simplifications assumed during the FEM modeling process: critical sections are considered homogeneous along their longitude, and the properties of the materials were established according to the general characteristics of an earth fill dam. These characteristics were taken from the normative and similar studies in the country. This could also be due to the geodetic control points being anchored in the superficial layer of the slope when the construction of the dam was finished.

  1. Influence of El Niño Southern Oscillation on global hydropower production

    NASA Astrophysics Data System (ADS)

    Ng, Jia Yi; Turner, Sean W. D.; Galelli, Stefano

    2017-03-01

    El Niño Southern Oscillation (ENSO) strongly influences the global climate system, affecting hydrology in many of the world’s river basins. This raises the prospect of ENSO-driven variability in global and regional hydroelectric power generation. Here we study these effects by generating time series of power production for 1593 hydropower dams, which collectively represent more than half of the world’s existing installed hydropower capacity. The time series are generated by forcing a detailed dam model with monthly-resolution, 20th century inflows—the model includes plant specifications, storage dynamics and realistic operating schemes, and runs irrespectively of the dam construction year. More than one third of simulated dams exhibit statistically significant annual energy production anomalies in at least one of the two ENSO phases of El Niño and La Niña. For most dams, the variability of relative anomalies in power production tends to be less than that of the forcing inflows—a consequence of dam design specifications, namely maximum turbine release rate and reservoir storage, which allows inflows to accumulate for power generation in subsequent dry years. Production is affected most prominently in Northwest United States, South America, Central America, the Iberian Peninsula, Southeast Asia and Southeast Australia. When aggregated globally, positive and negative energy production anomalies effectively cancel each other out, resulting in a weak and statistically insignificant net global anomaly for both ENSO phases.

  2. The rate and pattern of bed incision and bank adjustment on the Colorado River in Glen Canyon downstream from Glen Canyon Dam, 1956-2000

    USGS Publications Warehouse

    Grams, P.E.; Schmidt, J.C.; Topping, D.J.

    2007-01-01

    Closure of Glen Canyon Dam in 1963 transformed the Colorado River by reducing the magnitude and duration of spring floods, increasing the magnitude of base flows, and trapping fine sediment delivered from the upper watershed. These changes caused the channel downstream in Glen Canyon to incise, armor, and narrow. This study synthesizes over 45 yr of channel-change measurements and demonstrates that the rate and style of channel adjustment are directly related to both natural processes associated with sediment deficit and human decisions about dam operations. Although bed lowering in lower Glen Canyon began when the first cofferdam was installed in 1959, most incision occurred in 1965 in conjunction with 14 pulsed high flows that scoured an average of 2.6 m of sediment from the center of the channel. The average grain size of bed material has increased from 0.25 mm in 1956 to over 20 mm in 1999. The magnitude of incision at riffles decreases with distance downstream from the dam, while the magnitude of sediment evacuation from pools is spatially variable and extends farther downstream. Analysis of bed-material mobility indicates that the increase in bed-material grain size and reduction in reach-average gradient are consistent with the transformation of an adjustable-bed alluvial river to a channel with a stable bed that is rarely mobilized. Decreased magnitude of peak discharges in the post-dam regime coupled with channel incision and the associated downward shifts of stage-discharge relations have caused sandbar and terrace erosion and the transformation of previously active sandbars and gravel bars to abandoned deposits that are no longer inundated. Erosion has been concentrated in a few pre-dam terraces that eroded rapidly for brief periods and have since stabilized. The abundance of abandoned deposits decreases downstream in conjunction with decreasing magnitude of shift in the stage-discharge relations. In the downstream part of the study area where riffles controlling channel elevation have not incised, channel narrowing has resulted from decreased magnitude of peak discharges and minor post-dam deposition. These physical changes to the aquatic and riparian systems have supported the establishment and success of an artifact ecosystem dominated by non-native species. Models for the channel response downstream from large dams typically consider factors such as the degree of sediment deficit, the pre-dam surface and subsurface grain size, and the magnitude of post-dam average flows. These results suggest that it is also necessary to consider (1) the possibility of variable responses among different channel elements and (2) the potential importance of exceptional flows resulting from management decisions. ?? 2007 Geological Society of America.

  3. Climate change impact on operation of dams and hydroelectricity generation in the Northeastern United States

    NASA Astrophysics Data System (ADS)

    Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.

    2016-12-01

    We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.

  4. Analyzing the Impacts of Dams on Riparian Ecosystems: A Review of Research Strategies and Their Relevance to the Snake River Through Hells Canyon

    PubMed Central

    Braatne, Jeffrey H.; Goater, Lori A.; Blair, Charles L.

    2007-01-01

    River damming provides a dominant human impact on river environments worldwide, and while local impacts of reservoir flooding are immediate, subsequent ecological impacts downstream can be extensive. In this article, we assess seven research strategies for analyzing the impacts of dams and river flow regulation on riparian ecosystems. These include spatial comparisons of (1) upstream versus downstream reaches, (2) progressive downstream patterns, or (3) the dammed river versus an adjacent free-flowing or differently regulated river(s). Temporal comparisons consider (4) pre- versus post-dam, or (5) sequential post-dam conditions. However, spatial comparisons are complicated by the fact that dams are not randomly located, and temporal comparisons are commonly limited by sparse historic information. As a result, comparative approaches are often correlative and vulnerable to confounding factors. To complement these analyses, (6) flow or sediment modifications can be implemented to test causal associations. Finally, (7) process-based modeling represents a predictive approach incorporating hydrogeomorphic processes and their biological consequences. In a case study of Hells Canyon, the upstream versus downstream comparison is confounded by a dramatic geomorphic transition. Comparison of the multiple reaches below the dams should be useful, and the comparison of Snake River with the adjacent free-flowing Salmon River may provide the strongest spatial comparison. A pre- versus post-dam comparison would provide the most direct study approach, but pre-dam information is limited to historic reports and archival photographs. We conclude that multiple study approaches are essential to provide confident interpretations of ecological impacts downstream from dams, and propose a comprehensive study for Hells Canyon that integrates multiple research strategies. PMID:18043964

  5. A combined Eulerian-volume of fraction-Lagrangian method for atomization simulation

    NASA Technical Reports Server (NTRS)

    Seung, S. P.; Chen, C. P.; Ziebarth, John P.

    1994-01-01

    The tracking of free surfaces between liquid and gas phases and analysis of the interfacial phenomena between the two during the atomization and breakup process of a liquid fuel jet is modeled. Numerical modeling of liquid-jet atomization requires the resolution of different conservation equations. Detailed formulation and validation are presented for the confined dam broken problem, the water surface problem, the single droplet problem, a jet breakup problem, and the liquid column instability problem.

  6. One-Dimensional Model for Mud Flows.

    DTIC Science & Technology

    1985-10-01

    law relation between the Chezy coefficient and the flow Reynolds number. Jeyapalan et al. [2], in their analysis of mine tailing dam failures...8217.. .: -:.. ; .r;./. : ... . :\\ :. . ... . RESULTS The model is compared with several dambreak experiments performed by Jeyapalan et al. [3]. In these...0.34 seconds per computational node. 5i Test 6 Test 2 Test 7 44 E 3 A2 Experimental Results0 Jeyapalan at al. (3) - C6- Numerical Results 4 8 12 i6 Time

  7. Simulating future water temperatures in the North Santiam River, Oregon

    NASA Astrophysics Data System (ADS)

    Buccola, Norman L.; Risley, John C.; Rounds, Stewart A.

    2016-04-01

    A previously calibrated two-dimensional hydrodynamic and water-quality model (CE-QUAL-W2) of Detroit Lake in western Oregon was used in conjunction with inflows derived from Precipitation-Runoff Modeling System (PRMS) hydrologic models to examine in-lake and downstream water temperature effects under future climate conditions. Current and hypothetical operations and structures at Detroit Dam were imposed on boundary conditions derived from downscaled General Circulation Models in base (1990-1999) and future (2059-2068) periods. Compared with the base period, future air temperatures were about 2 °C warmer year-round. Higher air temperature and lower precipitation under the future period resulted in a 23% reduction in mean annual PRMS-simulated discharge and a 1 °C increase in mean annual estimated stream temperatures flowing into the lake compared to the base period. Simulations incorporating current operational rules and minimum release rates at Detroit Dam to support downstream habitat, irrigation, and water supply during key times of year resulted in lower future lake levels. That scenario results in a lake level that is above the dam's spillway crest only about half as many days in the future compared to historical frequencies. Managing temperature downstream of Detroit Dam depends on the ability to blend warmer water from the lake's surface with cooler water from deep in the lake, and the spillway is an important release point near the lake's surface. Annual average in-lake and release temperatures from Detroit Lake warmed 1.1 °C and 1.5 °C from base to future periods under present-day dam operational rules and fill schedules. Simulated dam operations such as beginning refill of the lake 30 days earlier or reducing minimum release rates (to keep more water in the lake to retain the use of the spillway) mitigated future warming to 0.4 and 0.9 °C below existing operational scenarios during the critical autumn spawning period for endangered salmonids. A hypothetical floating surface withdrawal at Detroit Dam improved temperature control in summer and autumn (0.6 °C warmer in summer, 0.6 °C cooler in autumn compared to existing structures) without altering release rates or lake level management rules.

  8. Preliminary Three-Dimensional Simulation of Sediment and Cesium Transport in the Ogi Dam Reservoir using FLESCOT – Task 6, Subtask 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Onishi, Yasuo; Kurikami, Hiroshi; Yokuda, Satoru T.

    2014-03-28

    After the accident at the Fukushima Daiichi Nuclear Power Plant in March 2011, the Japan Atomic Energy Agency and the Pacific Northwest National Laboratory initiated a collaborative project on environmental restoration. In October 2013, the collaborative team started a task of three-dimensional modeling of sediment and cesium transport in the Fukushima environment using the FLESCOT (Flow, Energy, Salinity, Sediment Contaminant Transport) code. As the first trial, we applied it to the Ogi Dam Reservoir that is one of the reservoirs in the Japan Atomic Energy Agency’s (JAEA’s) investigation project. Three simulation cases under the following different temperature conditions were studied:more » • incoming rivers and the Ogi Dam Reservoir have the same water temperature • incoming rivers have lower water temperature than that of the reservoir • incoming rivers have higher water temperature than that of the reservoir. The preliminary simulations suggest that seasonal temperature changes influence the sediment and cesium transport. The preliminary results showed the following: • Suspended sand, and cesium adsorbed by sand, coming into the reservoirs from upstream rivers is deposited near the reservoir entrance. • Suspended silt, and cesium adsorbed by silt, is deposited farther in the reservoir. • Suspended clay, and cesium adsorbed by clay, travels the farthest into the reservoir. With sufficient time, the dissolved cesium reaches the downstream end of the reservoir. This preliminary modeling also suggests the possibility of a suitable dam operation to control the cesium migration farther downstream from the dam. JAEA has been sampling in the Ogi Dam Reservoir, but these data were not yet available for the current model calibration and validation for this reservoir. Nonetheless these preliminary FLESCOT modeling results were qualitatively valid and confirmed the applicability of the FLESCOT code to the Ogi Dam Reservoir, and in general to other reservoirs in the Fukushima environment. The issues to be addressed in future are the following: • Validate the simulation results by comparison with the investigation data. • Confirm the applicability of the FLESCOT code to Fukushima coastal areas. • Increase computation speed by parallelizing the FLESCOT code.« less

  9. Modeling Shasta Dam operations to regulate temperatures for Chinook salmon under extreme climate and climate change

    NASA Astrophysics Data System (ADS)

    Dai, A.; Saito, L.; Sapin, J. R.; Rajagopalan, B.; Hanna, R. B.; Kauneckis, D. L.

    2014-12-01

    Chinook salmon populations have declined significantly after the construction of Shasta Dam on the Sacramento River in 1945 prevented them from spawning in the cold waters upstream. In 1994, the winter-run Chinook were listed under the Endangered Species Act and 3 years later the US Bureau of Reclamation began operating a temperature control device (TCD) on the dam that allows for selective withdrawal for downstream temperature control to promote salmon spawning while also maximizing power generation. However, dam operators are responsible to other interests that depend on the reservoir for water such as agriculture, municipalities, industry, and recreation. An increase in temperatures due to climate change may place additional strain on the ability of dam operations to maintain spawning habitat for salmon downstream of the dam. We examined the capability of Shasta Dam to regulate downstream temperatures under extreme climates and climate change by using stochastically generated streamflow, stream temperature, and weather inputs with a two-dimensional CE-QUAL-W2 model under several operational options. Operation performance was evaluated using degree days and cold pool volume (volume of water below a temperature threshold). Model results indicated that a generalized operations release schedule, in which release elevations varied over the year to match downstream temperature targets, performed best overall in meeting temperature targets while preserving cold pool volume. Releasing all water out the bottom throughout the year tended to meet temperature targets at the expense of depleting the cold pool, and releasing all water out uppermost gates preserved the cold pool, but released water that was too warm during the critical spawning period. With higher air temperatures due to climate change, both degree day and cold pool volume metrics were worse than baseline conditions, which suggests that Chinook salmon may be more negatively affected under climate change.

  10. Exploring the hydropower potential of future ice-free glacier basins

    NASA Astrophysics Data System (ADS)

    Round, Vanessa; Farinotti, Daniel; Huss, Matthias

    2017-04-01

    The retreat of glaciers over the next century will present new challenges related to water availability and cause significant changes to the landscape. The construction of dams in areas becoming ice-free has previously been suggested as a mitigation measure against changes to water resources in the European Alps. In Switzerland, a number of hydropower dams already exist directly below glaciers, and the hydropower potential of natural lakes left by retreating glaciers has been recognised. We expand these concepts to the regional, and ultimately global, scale to assess the potential of creating hydropower dams in glacier basins, encouraged by advantages such as relatively low ecological and social impacts, and the possibility to replicate the water storage capabilities of glaciers. In a first order assessment, dam volumes are computed using a subglacial topography model and dam walls simulated at the terminus of each glacier. Potential power production is then estimated from projected glacier catchment runoff until 2100 based on the Global Glacier Evolution Model (GloGEM), and penstock head approximated from a global digital elevation model. Based on this, a feasibility ranking system is presented which takes into account various proxies for cost, demand and impact, such as proximity to populations and existing infrastructure, geological risks and threatened species. The ultimate objective is to identify locations of glacier retreat which could most feasibly and beneficially be used for hydropower production.

  11. Catchment-wide survival of wild- and hatchery-reared Atlantic salmon smolts in a changing system

    USGS Publications Warehouse

    Stich, Daniel S.; Bailey, Michael M.; Holbrook, Christopher M.; Kinnison, Michael T.; Zydlewski, Joseph D.

    2015-01-01

    We developed a hierarchical multistate model to estimate survival of Atlantic salmon (Salmo salar) smolts in the Penobscot River, USA, over a decade during which two mainstem dams were removed from the catchment. We investigated effects of (i) environmental factors, (ii) rearing history, and (iii) management actions, including dam removal, turbine shutdown, and installation of new powerhouses. Mean ± SD smolt survival per kilometre was higher through free-flowing reaches of the catchment (0.995 ± 0.004·km−1) than through reaches containing dams that remain in the system (0.970 ± 0.019·km−1). We observed maximum survival between 12 and 17 °C and at intermediate discharges (1200 m3·s−1). Smolt survival increased concurrent with dam removal and decreased following increases in hydropower generation. The greatest increase in smolt survival followed seasonal turbine shutdowns at a dam located on the largest tributary to the Penobscot River, while other shutdowns had little influence. Our model provides a useful tool for assessing changes to survival of migratory species and will be useful for informing stocking plans to maximize numbers of smolts leaving coastal systems.

  12. Understanding the Role of Reservoir Size on Probable Maximum Precipitation

    NASA Astrophysics Data System (ADS)

    Woldemichael, A. T.; Hossain, F.

    2011-12-01

    This study addresses the question 'Does surface area of an artificial reservoir matter in the estimation of probable maximum precipitation (PMP) for an impounded basin?' The motivation of the study was based on the notion that the stationarity assumption that is implicit in the PMP for dam design can be undermined in the post-dam era due to an enhancement of extreme precipitation patterns by an artificial reservoir. In addition, the study lays the foundation for use of regional atmospheric models as one way to perform life cycle assessment for planned or existing dams to formulate best management practices. The American River Watershed (ARW) with the Folsom dam at the confluence of the American River was selected as the study region and the Dec-Jan 1996-97 storm event was selected for the study period. The numerical atmospheric model used for the study was the Regional Atmospheric Modeling System (RAMS). First, the numerical modeling system, RAMS, was calibrated and validated with selected station and spatially interpolated precipitation data. Best combinations of parameterization schemes in RAMS were accordingly selected. Second, to mimic the standard method of PMP estimation by moisture maximization technique, relative humidity terms in the model were raised to 100% from ground up to the 500mb level. The obtained model-based maximum 72-hr precipitation values were named extreme precipitation (EP) as a distinction from the PMPs obtained by the standard methods. Third, six hypothetical reservoir size scenarios ranging from no-dam (all-dry) to the reservoir submerging half of basin were established to test the influence of reservoir size variation on EP. For the case of the ARW, our study clearly demonstrated that the assumption of stationarity that is implicit the traditional estimation of PMP can be rendered invalid to a large part due to the very presence of the artificial reservoir. Cloud tracking procedures performed on the basin also give indication of the formation of mesoscale convective systems (MCS) in the vicinity of dams/reservoirs that may have explicitly been triggered by their presence. The significance of this finding is that water resources managers need to consider the post-dam impact of water cycle and local climate due to the very reservoir and land use change triggered if efficient water resources management is desired. Future works of the study will include incorporation of the anthropogenic changes that occur as a result of the presence of dams/reservoirs in the forms of irrigation, urbanization and downstream wetland reduction. Similar hypothesis testing procedures will be applied to understand the combined effects of the reservoir size variation and anthropogenic changes in the extreme precipitation patterns.

  13. Pulsational Pair-instability Model for Superluminous Supernova PTF12dam: Interaction and Radioactive Decay

    NASA Astrophysics Data System (ADS)

    Tolstov, Alexey; Nomoto, Ken'ichi; Blinnikov, Sergei; Sorokina, Elena; Quimby, Robert; Baklanov, Petr

    2017-02-01

    Being a superluminous supernova, PTF12dam can be explained by a 56Ni-powered model, a magnetar-powered model, or an interaction model. We propose that PTF12dam is a pulsational pair-instability supernova, where the outer envelope of a progenitor is ejected during the pulsations. Thus, it is powered by a double energy source: radioactive decay of 56Ni and a radiative shock in a dense circumstellar medium. To describe multicolor light curves and spectra, we use radiation-hydrodynamics calculations of the STELLA code. We found that light curves are well described in the model with 40 M⊙ ejecta and 20-40 M⊙ circumstellar medium. The ejected 56Ni mass is about 6 M⊙, which results from explosive nucleosynthesis with large explosion energy (2-3) × 1052 erg. In comparison with alternative scenarios of pair-instability supernova and magnetar-powered supernova, in the interaction model, all the observed main photometric characteristics are well reproduced: multicolor light curves, color temperatures, and photospheric velocities.

  14. Isolating causal pathways between flow and fish in the regulated river hierarchy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McManamay, Ryan A.; Peoples, Brandon K.; Orth, Donald J.

    Unregulated river systems are organized in a hierarchy in which large-scale factors (i.e., landscape and segment scales) influence local habitats (i.e., reach, meso-, and microhabitat scales), and both differentially exert selective pressures on biota. Dams, however, create discontinua in these processes and change the hierarchical structure. We examined the relative roles of hydrology and other instream factors, within a hierarchical landscape context, in organizing fish communities in regulated and unregulated tributaries to the Upper Tennessee River, USA. We also used multivariate regression trees to identify factors that partition fish assemblages based on trait similarities, irrespective of spatial scale. Then, wemore » used classical path analysis and structural equation modeling to evaluate the most plausible hierarchical causal structure of specific trait-based community components, given the data. Both statistical approaches suggested that river regulation affects stream fishes through a variety of reach-scale variables, not always through hydrology itself. Though we observed different changes in flow, temperature, and biotic responses according to regulation types, the most predominant path in which dam regulation affected biota was via temperature alterations. Diversion dams had the strongest effects on fish assemblages. Diversion dams reduced flow magnitudes, leading to declines in fish richness but increased temperatures, leading to lower abundances in equilibrium species and nest guarders. Peaking and run-of-river dams increased flow variability, leading to lower abundances in nest-guarding fishes. Flow displayed direct relationships with biotic responses; however, results indicated that changes in temperature and substrate had equal, if not stronger, effects on fish assemblage composition. The strength and nature of relationships depended on whether flow metrics were standardized for river size. Here, we suggest that restoration efforts in regulated rivers focus on improving flow conditions in conjunction with temperature and substrate restoration.« less

  15. Isolating causal pathways between flow and fish in the regulated river hierarchy

    DOE PAGES

    McManamay, Ryan A.; Peoples, Brandon K.; Orth, Donald J.; ...

    2015-07-07

    Unregulated river systems are organized in a hierarchy in which large-scale factors (i.e., landscape and segment scales) influence local habitats (i.e., reach, meso-, and microhabitat scales), and both differentially exert selective pressures on biota. Dams, however, create discontinua in these processes and change the hierarchical structure. We examined the relative roles of hydrology and other instream factors, within a hierarchical landscape context, in organizing fish communities in regulated and unregulated tributaries to the Upper Tennessee River, USA. We also used multivariate regression trees to identify factors that partition fish assemblages based on trait similarities, irrespective of spatial scale. Then, wemore » used classical path analysis and structural equation modeling to evaluate the most plausible hierarchical causal structure of specific trait-based community components, given the data. Both statistical approaches suggested that river regulation affects stream fishes through a variety of reach-scale variables, not always through hydrology itself. Though we observed different changes in flow, temperature, and biotic responses according to regulation types, the most predominant path in which dam regulation affected biota was via temperature alterations. Diversion dams had the strongest effects on fish assemblages. Diversion dams reduced flow magnitudes, leading to declines in fish richness but increased temperatures, leading to lower abundances in equilibrium species and nest guarders. Peaking and run-of-river dams increased flow variability, leading to lower abundances in nest-guarding fishes. Flow displayed direct relationships with biotic responses; however, results indicated that changes in temperature and substrate had equal, if not stronger, effects on fish assemblage composition. The strength and nature of relationships depended on whether flow metrics were standardized for river size. Here, we suggest that restoration efforts in regulated rivers focus on improving flow conditions in conjunction with temperature and substrate restoration.« less

  16. Seismic Stability Evaluation of Ririe Dam and Reservoir Project. Report 2. Stability Calculations, Analysis, and Evaluations. Volume 1. Main Text

    DTIC Science & Technology

    1991-09-01

    Army (i #Awleable) Engineer istrict. Walls Welli NPW-EN- GI _____________________ Bc DRSSW4~Sse.adZPa 10 SOURCE OF FUNDING NUMBERS Bldg. 602, City...cracks induced by ground motions. Z. Overtopping of dam due to seiches in reservoir. h. Overtopping of dam due to slides or rockfalls into reservoir. j...overtopping due to slides or rockfalls is not likely. Three potential modes of failure remain from the original list: (c) slope failures induced by

  17. National Dam Safety Program. Watchung Lake Dam (NJ00767), Raritan River Basin, Stony Brook, Somerset County, New Jersey Phase I Inspection Report.

    DTIC Science & Technology

    1981-07-01

    Safety Program Erosion Embankmients Watchung Lake Dam, N.J. Visual InspectionSeae IStructural Analysis Spillways 12M~ A0ST Acr (cathiue samvwgip @ta N...determined by a qualified professional consultant engaged by the owner using more sophisticated methods , procedures and studies within six months...be overtopped. (The SDF, in this instance, is one half of the Probable Maximum Flood). The decision to consider the spillway " inaae - quate" instead of

  18. A Video Method to Study Drosophila Sleep

    PubMed Central

    Zimmerman, John E.; Raizen, David M.; Maycock, Matthew H.; Maislin, Greg; Pack, Allan I.

    2008-01-01

    Study Objectives: To use video to determine the accuracy of the infrared beam-splitting method for measuring sleep in Drosophila and to determine the effect of time of day, sex, genotype, and age on sleep measurements. Design: A digital image analysis method based on frame subtraction principle was developed to distinguish a quiescent from a moving fly. Data obtained using this method were compared with data obtained using the Drosophila Activity Monitoring System (DAMS). The location of the fly was identified based on its centroid location in the subtracted images. Measurements and Results: The error associated with the identification of total sleep using DAMS ranged from 7% to 95% and depended on genotype, sex, age, and time of day. The degree of the total sleep error was dependent on genotype during the daytime (P < 0.001) and was dependent on age during both the daytime and the nighttime (P < 0.001 for both). The DAMS method overestimated sleep bout duration during both the day and night, and the degree of these errors was genotype dependent (P < 0.001). Brief movements that occur during sleep bouts can be accurately identified using video. Both video and DAMS detected a homeostatic response to sleep deprivation. Conclusions: Video digital analysis is more accurate than DAMS in fly sleep measurements. In particular, conclusions drawn from DAMS measurements regarding daytime sleep and sleep architecture should be made with caution. Video analysis also permits the assessment of fly position and brief movements during sleep. Citation: Zimmerman JE; Raizen DM; Maycock MH; Maislin G; Pack AI. A video method to study drosophila sleep. SLEEP 2008;31(11):1587–1598. PMID:19014079

  19. Independent technical review and analysis of hydraulic modeling and hydrology under low-flow conditions of the Des Plaines River near Riverside, Illinois

    USGS Publications Warehouse

    Over, Thomas M.; Straub, Timothy D.; Hortness, Jon E.; Murphy, Elizabeth A.

    2012-01-01

    The U.S. Geological Survey (USGS) has operated a streamgage and published daily flows for the Des Plaines River at Riverside since Oct. 1, 1943. A HEC-RAS model has been developed to estimate the effect of the removal of Hofmann Dam near the gage on low-flow elevations in the reach approximately 3 miles upstream from the dam. The Village of Riverside, the Illinois Department of Natural Resources-Office of Water Resources (IDNR-OWR), and the U. S. Army Corps of Engineers-Chicago District (USACE-Chicago) are interested in verifying the performance of the HEC-RAS model for specific low-flow conditions, and obtaining an estimate of selected daily flow quantiles and other low-flow statistics for a selected period of record that best represents current hydrologic conditions. Because the USGS publishes streamflow records for the Des Plaines River system and provides unbiased analyses of flows and stream hydraulic characteristics, the USGS served as an Independent Technical Reviewer (ITR) for this study.

  20. Regulation causes nitrogen cycling discontinuities in Mediterranean rivers.

    PubMed

    von Schiller, Daniel; Aristi, Ibon; Ponsatí, Lídia; Arroita, Maite; Acuña, Vicenç; Elosegi, Arturo; Sabater, Sergi

    2016-01-01

    River regulation has fundamentally altered large sections of the world's river networks. The effects of dams on the structural properties of downstream reaches are well documented, but less is known about their effect on river ecosystem processes. We investigated the effect of dams on river nutrient cycling by comparing net uptake of total dissolved nitrogen (TDN), phosphorus (TDP) and organic carbon (DOC) in river reaches located upstream and downstream from three reservoir systems in the Ebro River basin (NE Iberian Peninsula). Increased hydromorphological stability, organic matter standing stocks and ecosystem metabolism below dams enhanced the whole-reach net uptake of TDN, but not that of TDP or DOC. Upstream from dams, river reaches tended to be at biogeochemical equilibrium (uptake≈release) for all nutrients, whereas river reaches below dams acted as net sinks of TDN. Overall, our results suggest that flow regulation by dams may cause relevant N cycling discontinuities in rivers. Higher net N uptake capacity below dams could lead to reduced N export to downstream ecosystems. Incorporating these discontinuities could significantly improve predictive models of N cycling and transport in complex river networks. Copyright © 2015. Published by Elsevier B.V.

  1. Evolution of an interfacial crack on the concrete-embankment boundary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glascoe, Lee; Antoun, Tarabay; Kanarska, Yuliya

    2013-07-10

    Failure of a dam can have subtle beginnings. A small crack or dislocation at the interface of the concrete dam and the surrounding embankment soil initiated by, for example, a seismic or an explosive event can lead to a catastrophic failure of the dam. The dam may ‘self-rehabilitate’ if a properly designed granular filter is engineered around the embankment. Currently, the design criteria for such filters have only been based on experimental studies. We demonstrate the numerical prediction of filter effectiveness at the soil grain scale. This joint LLNL-ERDC basic research project, funded by the Department of Homeland Security’s Sciencemore » and Technology Directorate (DHS S&T), consists of validating advanced high performance computer simulations of soil erosion and transport of grain- and dam-scale models to detailed centrifuge and soil erosion tests. Validated computer predictions highlight that a resilient filter is consistent with the current design specifications for dam filters. These predictive simulations, unlike the design specifications, can be used to assess filter success or failure under different soil or loading conditions and can lead to meaningful estimates of the timing and nature of full-scale dam failure.« less

  2. Epigenetic Influence of Dam Methylation on Gene Expression and Attachment in Uropathogenic Escherichia coli.

    PubMed

    Stephenson, Stacy Ann-Marie; Brown, Paul D

    2016-01-01

    Urinary tract infections (UTI) are among the most frequently encountered infections in clinical practice globally. Predominantly a burden among female adults and infants, UTIs primarily caused by uropathogenic Escherichia coli (UPEC) results in high morbidity and fiscal health strains. During pathogenesis, colonization of the urinary tract via fimbrial adhesion to mucosal cells is the most critical point in infection and has been linked to DNA methylation. Furthermore, with continuous exposure to antibiotics as the standard therapeutic strategy, UPEC has evolved to become highly adaptable in circumventing the effect of antimicrobial agents and host defenses. Hence, the need for alternative treatment strategies arises. Since differential DNA methylation is observed as a critical precursor to virulence in various pathogenic bacteria, this body of work sought to assess the influence of the DNA adenine methylase (dam) gene on gene expression and cellular adhesion in UPEC and its potential as a therapeutic target. To monitor the influence of dam on attachment and FQ resistance, selected UPEC dam mutants created via one-step allelic exchange were transformed with cloned qnrA and dam complement plasmid for comparative analysis of growth rate, antimicrobial susceptibility, biofilm formation, gene expression, and mammalian cell attachment. The absence of DNA methylation among dam mutants was apparent. Varying deficiencies in cell growth, antimicrobial resistance and biofilm formation, alongside low-level increases in gene expression (recA and papI), and adherence to HEK-293 and HTB-9 mammalian cells were also detected as a factor of SOS induction to result in increased mutability. Phenotypic characteristics of parental strains were restored in dam complement strains. Dam's vital role in DNA methylation and gene expression in local UPEC isolates was confirmed. Similarly to dam-deficient Enterohemorrhagic E. coli (EHEC), these findings suggest unsuccessful therapeutic use of Dam inhibitors against UPEC or dam-deficient UPEC strains as attenuated live vaccines. However, further investigations are necessary to determine the post-transcriptional influence of dam on the regulatory network of virulence genes central to pathogenesis.

  3. Application of remote sensing data for measuring freshwater ecosystems changes below the Zeya dam in the Russian Far East

    NASA Astrophysics Data System (ADS)

    Nikitina, Oxana I.; Bazarov, Kirill Y.; Egidarev, Evgeny G.

    2018-06-01

    The large Zeya hydropower dam is located on the Zeya River, the largest left-bank tributary of the Amur-Heilong River in Russia. The dam had been constructed by 1980 and its operation has significantly transformed the flow regime of the Zeya River. The flow regulation has reduced the magnitude of periodic flooding of the floodplain areas located downstream from the Zeya dam and disrupted habitats of flora and fauna. An estimation of the transformation of the freshwater ecosystems is required to develop measures necessary either to maintain or restore disrupted ecosystems. Application of remote sensing methods allows measuring characteristics of the ecosystem's components. Two sections of a floodplain below the Zeya dam were considered for analysis in order to detect changes in objects at each site during the comparison of remote data from 1969/1971 and 2016.

  4. Survival and Passage of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead at McNary Dam, 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hughes, James S.; Weiland, Mark A.; Woodley, Christa M.

    The study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead at McNary Dam as stipulated by the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. This study supports the USACE’s continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  5. Initial Geomorphic Responses to Removal of Milltown Dam, Clark Fork River, Montana, USA

    NASA Astrophysics Data System (ADS)

    Wilcox, A. C.; Brinkerhoff, D.; Woelfle-Erskine, C.

    2008-12-01

    The removal of Milltown Dam on the Clark Fork River, Montana, USA, is creating a field-scale experiment on upstream and downstream responses to dam removal and on how gravel-bed rivers respond to sediment pulses. Milltown Dam was removed in 2008, reconnecting the Clark Fork River to its upstream basin in terms of sediment transport and fish passage. This dam removal is especially notable because (1) it is the largest dam removal to date in the United States in terms of the volume of reservoir sediment potentially available for downstream transport (over 3 million m3; 1.7 million m3 are being mechanically removed); and (2) the dam is the downstream end of the largest Superfund site in the United States, the Clark Fork Complex, and reservoir sediments are composed largely of contaminated mine tailings. Data collection on pre- and post-dam removal channel morphology, bed sediment characteristics, and sediment loads are being used to investigate spatial and temporal patterns of sediment transport and deposition associated with this dam removal. In the first several months following breaching of the dam, snowmelt runoff with a 3-year recurrence interval peak caused substantial erosion and downstream transport of metals-laden sediments from Milltown reservoir. Reservoir sediments in the Clark Fork arm of Milltown reservoir eroded at levels far exceeding modeling predictions as a result of both incision to the new base level created by dam removal and bank retreat of over 200 m in reaches upstream of a constructed bypass reach and remediation area. Copper and other metals in these eroded reservoir sediments provide a tracer for identifying whether sediment deposits observed downstream of the dam originated from Milltown reservoir or uncontaminated tributaries and indicate that Milltown sediments have reached over 200 km downstream. Downstream deposition has been greatest along channel margins and in side-channel areas, whereas the transport capacity of the active channel has limited channel changes there.

  6. Dam construction impacts on multiscale characterization of sediment discharge in two typical karst watersheds of southwest China

    NASA Astrophysics Data System (ADS)

    Li, Zhenwei; Xu, Xianli; Xu, Chaohao; Liu, Meixian; Wang, Kelin

    2018-03-01

    Southwest China, as one of the largest continuous karst areas in the world, is a severely eroded region due to its special geological condition. Thus, soil and water conservation measures such as dam construction have been extensively implemented in this region to control sediment delivery. However, it remains unclear how dam construction affects multiscale variability of sediment discharge (SD) and its potentially influential factors in southwest China. To assess this, annual SD, water discharge (WD), precipitation (PT), potential evapotranspiration (PET), and normalized differential vegetation index (NDVI) data from 1955 to 2015 were obtained from two karst watersheds of Liujiang (no large dams) and Hongshui (dam-controlled). These sites shared the similar climatic conditions. The Mann-Kendal test, Wilcoxon rank-sum test, and continuous wavelet transform analysis was used to detect the trends and periodicity in SD, and wavelet coherence analysis were employed to detect the temporal covariance between SD and WD, PT, PET, and NDVI. Results indicated that the multiscale variability of SD was strongly influenced by dam construction. The annual SD showed significant 4-year periodic oscillation in the Liujiang watershed, while no significant cycles were found in the Hongshui watershed. Dam construction exerted substantial influence on the multiscale correlations between SD and its associated factors. The time scales that the NDVI resonated with SD were concentrated on the periodicity of 2- and 3-year in the Liujiang watershed. In contrast, no significant periodicities were observed in the Hongshu watershed. This study yields a greater understanding of SD dynamics, and is helpful for better watershed management in karst areas of southwest China.

  7. Predicting spread of invasive exotic plants into de-watered reservoirs following dam removal on the Elwha River, Olympic National Park, Washington

    USGS Publications Warehouse

    Woodward, Andrea; Torgersen, Christian E.; Chenoweth, Joshua; Beirne, Katherine; Acker, Steve

    2011-01-01

    The National Park Service is planning to start the restoration of the Elwha River ecosystem in Olympic National Park by removing two high head dams beginning in 2011. The potential for dispersal of exotic plants into dewatered reservoirs following dam removal, which would inhibit restoration of native vegetation, is of great concern. We focused on predicting long-distance dispersal of invasive exotic plants rather than diffusive spread because local sources of invasive species have been surveyed. We included the long-distance dispersal vectors: wind, water, birds, beavers, ungulates, and users of roads and trails. Using information about the current distribution of invasive species from two surveys, various geographic information system techniques and models, and statistical methods, we identified high-priority areas for Park staff to treat prior to dam removal, and areas of the dewatered reservoirs at risk after dam removal.

  8. Earthquake Response of Concrete Gravity Dams Including Hydrodynamic and Foundation Interaction Effects,

    DTIC Science & Technology

    1980-01-01

    standard procedure for Analysis of all types of civil engineering struc- tures. Early in its development, it became apparent that this method had...unique potentialities in the evaluation of stress in dams, and many of its earliest civil engineering applications concerned special problems associated...with such structures [3,4]. The earliest dynamic finite element analyses of civil engineering structures involved the earthquake response analysis of

  9. PREDICTION OF TOTAL DISSOLVED GAS EXCHANGE AT HYDROPOWER DAMS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hadjerioua, Boualem; Pasha, MD Fayzul K; Stewart, Kevin M

    2012-07-01

    Total dissolved gas (TDG) supersaturation in waters released at hydropower dams can cause gas bubble trauma in fisheries resulting in physical injuries and eyeball protrusion that can lead to mortality. Elevated TDG pressures in hydropower releases are generally caused by the entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin. The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. These dam operations are constrained bymore » state and federal water quality standards for TDG saturation which balance the benefits of spillway operations designed for Endangered Species Act (ESA)-listed fisheries versus the degradation to water quality as defined by TDG saturation. In the 1970s, the United States Environmental Protection Agency (USEPA), under the federal Clean Water Act (Section 303(d)), established a criterion not to exceed the TDG saturation level of 110% in order to protect freshwater and marine aquatic life. The states of Washington and Oregon have adopted special water quality standards for TDG saturation in the tailrace and forebays of hydropower facilities on the Columbia and Snake Rivers where spillway operations support fish passage objectives. The physical processes that affect TDG exchange at hydropower facilities have been studied throughout the CRB in site-specific studies and routine water quality monitoring programs. These data have been used to quantify the relationship between project operations, structural properties, and TDG exchange. These data have also been used to develop predictive models of TDG exchange to support real-time TDG management decisions. These empirically based predictive models have been developed for specific projects and account for both the fate of spillway and powerhouse flows in the tailrace channel and resultant exchange in route to the next downstream dam. Currently, there exists a need to summarize the general finding from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow the formulation of optimal daily water regulation schedules subject to water quality constraints for TDG supersaturation. A generalized TDG exchange model can also be applied to other hydropower dams that affect TDG pressures in tailraces and can be used to develop alternative operational and structural measures to minimize TDG generation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases. TDG data from hydropower facilities located throughout the northwest region of the United States will be used to identify relationships between TDG exchange and relevant dependent variables. Data analysis and regression techniques will be used to develop predictive TDG exchange expressions for various structural categories.« less

  10. Reconstructing western Grand Canyon's lava dams and their failure mechanisms: new insights from geochemical correlation and 40Ar/39Ar dating

    NASA Astrophysics Data System (ADS)

    Crow, R.; Karlstrom, K. E.; McIntosh, W. C.; Peters, L.; Dunbar, N. W.

    2010-12-01

    New geochemical analyzes and 40Ar/39Ar dating of lava dam remnants allows for the more accurate reconstruction of the timing, extent, and structure of western Grand Canyon’s lava dams. Whole-rock major, trace, and rare-earth element (REE) analyzes on over 60 basaltic lava dam remnants, cascades, plugs, and basaltic alluvium, show compositional variation from basanites to alkali basalts to tholeiites. Whitmore Canyon flows, for example, are some of the only tholeiitic flows and have a distinguishable trace and REE composition, which allows for correlation of dam remnants. Over 30 new high-precision 40Ar/39Ar dates also aid in remnant correlation and establish a better-constrained sequence of intra-canyon lava dams. Reliable 40Ar/39Ar dates on western Grand Canyon’s intra-canyon basalts range from ca. 100 ka to 840 ka (new date). The best understood lava dam formed from tholeiitic flows that erupted on the north rim, flowed down Whitmore side canyon and blocked a 6-km-long reach of the Grand Canyon. The youngest of these flows is unique because we know its age (200ka), its composition (tholeiitic), and the exact area where it entered Grand Canyon. The highest flow in the resulting dam, Whitmore Cascade, is capped with very coarse basaltic alluvium that previous workers have attributed to an upstream catastrophic dam failure event at about 200 ka. However, strong similarities between the geochemistry and age of the alluvium with the underlying Whitmore Cascade flow suggest that the alluvial deposit is related to failure of the 200 ka Whitmore Cascade dam itself. Similarly the 100 ka Upper Gray Ledge flow is commonly overlain by a balsaltic alluvium that is indistinguishable in terms of age and geochemistry from the underlying Upper Gray Ledge flow. These observations lead to a new model for Grand Canyon lava dams by which lava dams undergo multi-staged failure where the upstream parts of dams fail quickly (sometimes catastrophically) but downstream parts are longer lived because they undergo less interaction with river water and fracturing and generally fill dry portions of the river bed. Identification of far-traveled clasts on top of lava dam remnants in at least two locations supports the idea that the stable Colorado River established itself on top of the distal parts of some lava dams. Thus, whereas previous workers reported that deposits from outburst flood dam failure events exist in western grand canyon, our data identify specific dam failures and an interaction of catastrophic events at the head of lava dams and modified fluvial processes in distal portions of dams.

  11. The effects of river impoundment and hatchery rearing on the migration behavior of juvenile steelhead in the Lower Snake River, Washington

    USGS Publications Warehouse

    Plumb, J.M.; Perry, R.W.; Adams, N.S.; Rondorf, D.W.

    2006-01-01

    We used radiotelemetry to monitor the migration behavior of juvenile hatchery and wild steelhead Oncorhynchus mykiss as they migrated through Lower Granite Reservoir and Dam on the lower Snake River, Washington. From 1996 to 2001, we surgically implanted radio transmitters in 1,540 hatchery steelhead and 1,346 wild steelhead. For analysis, we used the inverse Gaussian distribution to describe travel time distributions for cohorts (>50 fish) of juvenile steelhead as they migrated downriver. Mean travel rates were significantly related to reach- and discharge-specific water velocities. Also, mean travel rates near the dam were slower for a given range of water velocities than were mean travel rates through the reservoir, indicating that the presence of the dam caused delay to juvenile steelhead over and above the effect of water velocity. Hatchery steelhead took about twice as long as wild steelhead to pass the dam as a result of the higher proportions of hatchery steelhead traveling upriver from the dam. Because upriver travel and the resulting migration delay might decrease survival, it is possible that hatchery steelhead survive at lower rates than wild steelhead. Our analysis identified a discharge threshold (???2,400 m3/s) below which travel time and the percentage of fish traveling upriver from the dam increased rapidly, providing support for the use of minimum flow targets to mitigate for fish delay and possibly enhance juvenile steelhead survival.

  12. The effect of dams and seasons on malaria incidence and anopheles abundance in Ethiopia

    PubMed Central

    2013-01-01

    Background Reservoirs created by damming rivers are often believed to increase malaria incidence risk and/or stretch the period of malaria transmission. In this paper, we report the effects of a mega hydropower dam on P. falciparum malaria incidence in Ethiopia. Methods A longitudinal cohort study was conducted over a period of 2 years to determine Plasmodium falciparum malaria incidence among children less than 10 years of age living near a mega hydropower dam in Ethiopia. A total of 2080 children from 16 villages located at different distances from a hydropower dam were followed up from 2008 to 2010 using active detection of cases based on weekly house to house visits. Of this cohort of children, 951 (48.09%) were females and 1059 (51.91%) were males, with a median age of 5 years. Malaria vectors were simultaneously surveyed in all the 16 study villages. Frailty models were used to explore associations between time-to-malaria and potential risk factors, whereas, mixed-effects Poisson regression models were used to assess the effect of different covariates on anopheline abundance. Results Overall, 548 (26.86%) children experienced at least one clinical malaria episode during the follow up period with mean incidence rate of 14.26 cases/1000 child-months at risk (95% CI: 12.16 - 16.36). P. falciparum malaria incidence showed no statistically significant association with distance from the dam reservoir (p = 0.32). However, P. falciparum incidence varied significantly between seasons (p < 0.01). The malaria vector, Anopheles arabiensis, was however more abundant in villages nearer to the dam reservoir. Conclusions P. falciparum malaria incidence dynamics were more influenced by seasonal drivers than by the dam reservoir itself. The findings could have implications in timing optimal malaria control interventions and in developing an early warning system in Ethiopia. PMID:23566411

  13. High post-partum levels of corticosterone given to dams influence postnatal hippocampal cell proliferation and behavior of offspring: A model of post-partum stress and possible depression.

    PubMed

    Brummelte, Susanne; Pawluski, Jodi L; Galea, Liisa A M

    2006-09-01

    Post-partum stress and depression (PPD) have a significant effect on child development and behavior. Depression is associated with hypercortisolism in humans, and the fluctuating levels of hormones, including corticosterone, during pregnancy and the post-partum, may contribute to PPD. The present study was developed to investigate the effects of high-level corticosterone (CORT) post-partum in the mother on postnatal neurogenesis and behavior in the offspring. Sprague-Dawley dams were treated with either CORT (40 mg/kg) or sesame oil injections daily for 26 days beginning the day after giving birth. Dams were tested in the forced swim test (FST) and in the open field test (OFT) on days 24-26 post-partum. Results showed that the dams exposed to CORT expressed "depressive-like" behavior compared to controls, with decreased struggling behavior and increased immobility in the FST. To investigate the effects of treatment on hippocampal postnatal cell proliferation and survival in the offspring, males and females from treated dams were injected with BrdU (50 mg/kg) on postnatal day 21 and perfused either 24 h (cell proliferation) or 21 days (cell survival) later. Furthermore, male and female offspring from each litter were tested in adulthood on various behavioral tests, including the forced swim test, open field test, resistance to capture test and elevated plus maze. Intriguingly, male, but not female, offspring of CORT-treated dams exhibited decreased postnatal cell proliferation in the dentate gyrus. Both male and female offspring of CORT-treated dams showed higher resistance to capture and greater locomotor activity as assessed in the open field test. As high levels of CORT may be a characteristic of stress and/or depression, these findings support a model of 'CORT-induced' post-partum stress and possibly depression and demonstrate that the offspring of affected dams can exhibit changes in postnatal neurogenesis and behavior in adulthood.

  14. Elevated corticosterone levels during the first postpartum period influence subsequent pregnancy outcomes and behaviours of the dam.

    PubMed

    Wong, J H K; Brummelte, S; Galea, L A M

    2011-11-01

    Postpartum depression affects 15% of new mothers and previous depressive episodes increase the risk for postpartum depression. Chronic administration of corticosterone (CORT) to dams during the postpartum period causes depressive-like behaviour and has been used as a model of postpartum depression. To better understand the subsequent progress of this model, we examined whether there were persistent effects of CORT treatment during the dam's first postpartum period on maternal care and mood following a subsequent pregnancy. Sprague-Dawley female rats received either sesame oil (control) or CORT (40 mg/kg) injections for 22 days during their first postpartum period. Subsequently, all females were re-mated for a second time and neither group received treatment during the second postpartum period. Maternal care was observed from days 2-8 of each postpartum period and dams were tested in the forced-swim test on days 21 and 22 of the first and days 4 and 21 of the second postpartum period. As expected, the amount of time spent immobile in the forced-swim test was increased in CORT dams at the end of the first postpartum period; however, the amount of time spent immobile was decreased at the end of the second postpartum period relative to oil dams. Furthermore, dams treated with CORT in first postpartum period gave birth to a smaller litter with a larger male/female sex ratio after their second pregnancy. This implies that elevated stress hormone levels during the first postpartum period have a substantial influence on subsequent postpartum behaviour and litter characteristics. Further investigations are necessary to fully understand the effect of parity, experience during first motherhood, and hypothalamic-pituitary-adrenal axis regulation on postpartum depression. © 2011 The Authors. Journal of Neuroendocrinology © 2011 Blackwell Publishing Ltd.

  15. Impact of debris dams on hyporheic interaction along a semi-arid stream

    NASA Astrophysics Data System (ADS)

    Lautz, Laura K.; Siegel, Donald I.; Bauer, Robert L.

    2006-01-01

    Hyporheic exchange increases the potential for solute retention in streams by slowing downstream transport and increasing solute contact with the substrate. Hyporheic exchange may be a major mechanism to remove nutrients in semi-arid watersheds, where livestock have damaged stream riparian zones and contributed nutrients to stream channels. Debris dams, such as beaver dams and anthropogenic log dams, may increase hyporheic interactions by slowing stream water velocity, increasing flow complexity and diverting water to the subsurface.Here, we report the results of chloride tracer injection experiments done to evaluate hyporheic interaction along a 320 m reach of Red Canyon Creek, a second order stream in the semi-arid Wind River Range of Wyoming. The study site is part of a rangeland watershed managed by The Nature Conservancy of Wyoming, and used as a hydrologic field site by the University of Missouri Branson Geologic Field Station. The creek reach we investigated has debris dams and tight meanders that hypothetically should enhance hyporheic interaction. Breakthrough curves of chloride measured during the field experiment were modelled with OTIS-P, a one-dimensional, surface-water, solute-transport model from which we extracted the storage exchange rate and cross-sectional area of the storage zone As for hyporheic exchange. Along gaining reaches of the stream reach, short-term hyporheic interactions associated with debris dams were comparable to those associated with severe meanders. In contrast, along the non-gaining reach, stream water was diverted to the subsurface by debris dams and captured by large-scale near-stream flow paths. Overall, hyporheic exchange rates along Red Canyon Creek during snowmelt recession equal or exceed exchange rates observed during baseflow at other streams.

  16. An evaluation of fish behavior upstream of the water temperature control tower at Cougar Dam, Oregon, using acoustic cameras, 2013

    USGS Publications Warehouse

    Adams, Noah S.; Smith, Collin; Plumb, John M.; Hansen, Gabriel S.; Beeman, John W.

    2015-07-06

    This report describes the initial year of a 2-year study to determine the feasibility of using acoustic cameras to monitor fish movements to help inform decisions about fish passage at Cougar Dam near Springfield, Oregon. Specifically, we used acoustic cameras to measure fish presence, travel speed, and direction adjacent to the water temperature control tower in the forebay of Cougar Dam during the spring (May, June, and July) and fall (September, October, and November) of 2013. Cougar Dam is a high-head flood-control dam, and the water temperature control tower enables depth-specific water withdrawals to facilitate adjustment of water temperatures released downstream of the dam. The acoustic cameras were positioned at the upstream entrance of the tower to monitor free-ranging subyearling and yearling-size juvenile Chinook salmon (Oncorhynchus tshawytscha). Because of the large size discrepancy, we could distinguish juvenile Chinook salmon from their predators, which enabled us to measure predators and prey in areas adjacent to the entrance of the tower. We used linear models to quantify and assess operational and environmental factors—such as time of day, discharge, and water temperature—that may influence juvenile Chinook salmon movements within the beam of the acoustic cameras. Although extensive milling behavior of fish near the structure may have masked directed movement of fish and added unpredictability to fish movement models, the acoustic-camera technology enabled us to ascertain the general behavior of discrete size classes of fish. Fish travel speed, direction of travel, and counts of fish moving toward the water temperature control tower primarily were influenced by the amount of water being discharged through the dam.

  17. Controls on the breach geometry and flood hydrograph during overtopping of non-cohesive earthen dams

    USGS Publications Warehouse

    Walder, Joseph S.; Iverson, Richard M.; Godt, Jonathan W.; Logan, Matthew; Solovitz, Stephen A.

    2015-01-01

    Overtopping failure of non-cohesive earthen dams was investigated in 13 large-scale experiments with dams built of compacted, damp, fine-grained sand. Breaching was initiated by cutting a notch across the dam crest and allowing water escaping from a finite upstream reservoir to form its own channel. The channel developed a stepped profile, and upstream migration of the steps, which coalesced into a headcut, led to the establishment of hydraulic control (critical flow) at the channel head, or breach crest, an arcuate erosional feature that functions hydraulically as a weir. Novel photogrammetric methods, along with underwater videography, revealed that the retreating headcut maintained a slope near the angle of friction of the sand, while the cross section at the breach crest maintained a geometrically similar shape through time. That cross-sectional shape was nearly unaffected by slope failures, contrary to the assumption in many models of dam breaching. Flood hydrographs were quite reproducible--for sets of dams ranging in height from 0.55 m to 0.98 m--when the time datum was chosen as the time that the migrating headcut intersected the breach crest. Peak discharge increased almost linearly as a function of initial dam height. Early-time variability between flood hydrographs for nominally identical dams is probably a reflection of subtle experiment-to-experiment differences in groundwater hydrology and the interaction between surface water and groundwater.

  18. A Model of Beaver Meadow Complex Evolution in the Silvies River Basin, Oregon.

    NASA Astrophysics Data System (ADS)

    Nash, C.; Grant, G.; Campbell, S. D.

    2014-12-01

    There is increasing evidence to suggest that the pervasive incision seen in the American West is due, in part, to the removal of beaver (Castor canadensis) in the first half of the 19th century. New restoration strategies for these systems focus on the reintroduction of beaver and construction of beaver dam analogs. Such dams locally raise streams beds and water tables, reconnect incised channels to their former floodplains, trap sediment, increase hydraulic diversity, and promote riparian vegetation. However, the geomorphic and hydrologic impacts of both the original beaver dams and their analogs are poorly understood. Observations in the Silvies River basin in Oregon, USA - an upland, semi-arid catchment with extremely high historic beaver populations and a presently recovering population, inform a conceptual model for valley floor evolution with beaver dams. The evolution of the beaver dam complex is characterized by eight stages of morphologic adjustment: water impoundment, sediment deposition, pond filling, multi-thread meadow creation, dam breaching, channel incision, channel widening, and floodplain development. Well-constructed beaver dams, given sufficient time and sediment flux, will evolve from a series of ponds to a multi-threaded channel flowing through a wet meadow complex. If a dam in the system fails, due to overtopping, undercutting, lack of maintenance, or abandonment, the upstream channel will concentrate into a single channel and incise, followed over time by widening once critical bank heights are exceeded. From stratigraphic, dendrochronologic, and geomorphic measurements, we are constraining average timescales associated with each stage's duration and transitional period. Measured sedimentation rates behind modern beaver dam analogs on five stream systems permit calculation of sediment flux over recent time periods, and aid in developing regional rates of sediment deposition over a range of drainage areas and gradients. Stratigraphic and dendrochronologic records provide insight into rates of incision, widening, and floodplain development. These measurements are leading to an understanding of the timescales associated with each morphologic stage and transition period, as well as the long-term implications of reintroducing beaver into a wide range of stream systems.

  19. Applying 1D Sediment Models to Reservoir Flushing Studies: Measuring, Monitoring, and Modeling the Spencer Dam Sediment Flush with HEC-RAS

    DTIC Science & Technology

    2016-07-01

    approximately 5 hours (hr) after opening main gates. Multiple channels eroded (Figure 5), moving sediment through the dam throughout the first day...additional sediment evacuation was observed over the next 4 weeks. ERDC/CHL CHETN-XIV-52 July 2016 5 Figure 5. Multiple channels eroded...2015. A physically-based channel - modeling framework integrating HEC-RAS sediment transport capabilities and the USDA-ARS Bank-Stability and Toe-Erosion

  20. Qualitative simulation of bathymetric changes due to reservoir sedimentation: A Japanese case study

    PubMed Central

    Dai, Wenhong; Larson, Magnus; Beebo, Qaid Naamo; Xie, Qiancheng

    2017-01-01

    Sediment-dynamics modeling is a useful tool for estimating a dam’s lifespan and its cost–benefit analysis. Collecting real data for sediment-dynamics analysis from conventional field survey methods is both tedious and expensive. Therefore, for most rivers, the historical record of data is either missing or not very detailed. Available data and existing tools have much potential and may be used for qualitative prediction of future bathymetric change trend. This study shows that proxy approaches may be used to increase the spatiotemporal resolution of flow data, and hypothesize the river cross-sections and sediment data. Sediment-dynamics analysis of the reach of the Tenryu River upstream of Sakuma Dam in Japan was performed to predict its future bathymetric changes using a 1D numerical model (HEC-RAS). In this case study, only annually-averaged flow data and the river’s longitudinal bed profile at 5-year intervals were available. Therefore, the other required data, including river cross-section and geometry and sediment inflow grain sizes, had to be hypothesized or assimilated indirectly. The model yielded a good qualitative agreement, with an R2 (coefficient of determination) of 0.8 for the observed and simulated bed profiles. A predictive simulation demonstrated that the useful life of the dam would end after the year 2035 (±5 years), which is in conformity with initial detailed estimates. The study indicates that a sediment-dynamic analysis can be performed even with a limited amount of data. However, such studies may only assess the qualitative trends of sediment dynamics. PMID:28384361

  1. The role of reservoir storage in large-scale surface water availability analysis for Europe

    NASA Astrophysics Data System (ADS)

    Garrote, L. M.; Granados, A.; Martin-Carrasco, F.; Iglesias, A.

    2017-12-01

    A regional assessment of current and future water availability in Europe is presented in this study. The assessment was made using the Water Availability and Adaptation Policy Analysis (WAAPA) model. The model was built on the river network derived from the Hydro1K digital elevation maps, including all major river basins of Europe. Reservoir storage volume was taken from the World Register of Dams of ICOLD, including all dams with storage capacity over 5 hm3. Potential Water Availability is defined as the maximum amount of water that could be supplied at a certain point of the river network to satisfy a regular demand under pre-specified reliability requirements. Water availability is the combined result of hydrological processes, which determine streamflow in natural conditions, and human intervention, which determines the available hydraulic infrastructure to manage water and establishes water supply conditions through operating rules. The WAAPA algorithm estimates the maximum demand that can be supplied at every node of the river network accounting for the regulation capacity of reservoirs under different management scenarios. The model was run for a set of hydrologic scenarios taken from the Inter-Sectoral Impact Model Intercomparison Project (ISIMIP), where the PCRGLOBWB hydrological model was forced with results from five global climate models. Model results allow the estimation of potential water stress by comparing water availability to projections of water abstractions along the river network under different management alternatives. The set of sensitivity analyses performed showed the effect of policy alternatives on water availability and highlighted the large uncertainties linked to hydrological and anthropological processes.

  2. Scientific monitoring plan in support of the selected alternative of the Glen Canyon Dam Long-Term Experimental and Management Plan

    USGS Publications Warehouse

    Vanderkooi, Scott P.; Kennedy, Theodore A.; Topping, David J.; Grams, Paul E.; Ward, David L.; Fairley, Helen C.; Bair, Lucas S.; Sankey, Joel B.; Yackulic, Charles B.; Schmidt, John C.

    2017-01-18

    IntroductionThe purpose of this document is to describe a strategy by which monitoring and research data in the natural and social sciences will be collected, analyzed, and provided to the U.S. Department of the Interior (DOI), its bureaus, and to the Glen Canyon Dam Adaptive Management Program (GCDAMP) in support of implementation of the Glen Canyon Dam Long-Term Experimental and Management Plan (LTEMP) (U.S. Department of the Interior, 2016a). The selected alternative identified in the LTEMP Record of Decision (ROD) (U.S. Department of the Interior, 2016b) describes various data collection, analysis, modeling, and interpretation efforts to be conducted by the U.S. Geological Survey’s (USGS) Grand Canyon Monitoring and Research Center (GCMRC), partner agencies, and cooperators that will inform decisions about operations of Glen Canyon Dam and management of downstream resources between 2017 and 2037, the performance period of the LTEMP. General data collection, analysis, modeling, and interpretation activities are described in this science plan, whereas specific monitoring and research activities and detailed study plans are to be described in the GCDAMP’s triennial work plans (TWPs) to be developed by the Bureau of Reclamation and GCMRC with input from partner agencies and cooperators during the LTEMP period, which are to be reviewed and recommended by the GCDAMP and approved by the Secretary of the Interior. The GCDAMP consists of several components, the primary committee being the Adaptive Management Work Group (AMWG). This Federal advisory committee is composed of 25 agencies and stakeholder groups and is chaired by the Secretary of the Interior’s designee. The AMWG makes recommendations to the Secretary of the Interior concerning operations of Glen Canyon Dam and other experimental management actions that are intended to fulfill some obligations of the Grand Canyon Protection Act of 1992. The Technical Work Group (TWG) is a subcommittee of the AMWG and provides technical advice to the AMWG. It is composed of technical and science representatives from the same agencies and stakeholder groups who serve on the AMWG. GCMRC is the primary science provider to the GCDAMP and also coordinates many aspects of the science performed by cooperators and partner agencies. The Science Advisors Program provides independent science reviews and advice at the request of the GCDAMP.The plan proposed here necessarily depends on (1) the protocol for decision-making and the requirements for scientific data reporting described in the LTEMP ROD, (2) the priorities of the GCDAMP as directed by the LTEMP ROD (see Department of the Interior, 2016b, section 6.1), (3) the priorities for monitoring and research in the conservation measures section of the Biological Opinion for the LTEMP (U.S. Department of the Interior, 2016b, LTEMP ROD attachment E), (4) the priorities for resource management and information needs established by Federal and State resource-management agencies within the GCDAMP, (5) scientific understanding about the linkage between the status of those resources and operations of Glen Canyon Dam, and (6) the need to resolve existing scientific uncertainties about the linkage between dam operations and the condition of resources. We note that resource-management prioritization is fundamentally a policy decision charged specifically to DOI for the Colorado River in Glen and Grand Canyons, as outlined most recently in the LTEMP ROD, and is not the responsibility of the GCMRC. However, it is the responsibility of the GCMRC to describe the nature of scientific understanding, the nature of scientific uncertainty, and the risk of making resourcemanagement decisions in the face of existing scientific uncertainty. The goals of science activities in the next 20 years are to inform operational decisions regarding Glen Canyon Dam operations described in the LTEMP ROD, resolve remaining scientific uncertainties, and to monitor resource trends that are affected entirely, or in part, by dam operations.

  3. Erosion risk analysis by GIS in environmental impact assessments: a case study--Seyhan Köprü Dam construction.

    PubMed

    Sahin, S; Kurum, E

    2002-11-01

    Environmental Impact Assessment (EIA) is a systematically constructed procedure whereby environmental impacts caused by proposed projects are examined. Geographical Information Systems (GIS) are crucially efficient tools for impact assessment and their use is likely to dramatically increase in the near future. GIS have been applied to a wide range of different impact assessment projects and dams among them have been taken as the case work in this article. EIA Regulation in force in Turkey requires the analysis of steering natural processes that can be adversely affected by the proposed project, particularly in the section of the analysis of the areas with higher landscape value. At this point, the true potential value of GIS lies in its ability to analyze spatial data with accuracy. This study is an attempt to analyze by GIS the areas with higher landscape value in the impact assessment of dam constructions in the case of Seyhan-Köprü Hydroelectric Dam project proposal. A method needs to be defined before the overlapping step by GIS to analyze the areas with higher landscape value. In the case of Seyhan-Köprü Hydroelectric Dam project proposal of the present work, considering the geological conditions and the steep slopes of the area and the type of the project, the most important natural process is erosion. Therefore, the areas of higher erosion risk were considered as the Areas with Higher Landscape Value from the conservation demands points of view.

  4. Understanding the Amazon Hydrology for Sustainable Hydropower Development

    NASA Astrophysics Data System (ADS)

    Pokhrel, Y. N.; Chaudhari, S. N.

    2017-12-01

    Construction of 147 new hydropower dams, many of which are large, has been proposed in the Amazon river basin, despite the continuous stacking of negative impacts from the existing ones. These dams are continued to be built in a way that disrupts river ecology, causes large-scale deforestation, and negatively affects both the food systems nearby and downstream communities. In this study, we explore the impacts of the existing and proposed hydropower dams on the hydrological fluxes across the Amazonian Basin by incorporating human impact modules in an extensively validated regional hydrological model called LEAF-Hydro-Flood (LHF). We conduct two simulations, one in offline mode, forced by observed meteorological data for the historical period of 2000-2016 and the other in a coupled mode using the Weather Research and Forecasting (WRF) regional climate model. We mainly analyze terrestrial water storage and streamflow changes during the period of dam operations with and without human impacts. It is certain that the Amazon will undergo some major hydrological changes such as decrease in streamflow downstream in the coming decades caused due to these proposed dams. This study helps us understand and represent processes in a predictable manner, and provides the ability to evaluate future scenarios with dams and other major human influences while considering climate change in the basin. It also provides important insights on how to redesign the hydropower systems to make them truly renewable in terms of energy production, hydrology and ecology.

  5. Formation and failure of volcanic debris dams in the Chakachatna River valley associated with eruptions of the Spurr volcanic complex, Alaska

    USGS Publications Warehouse

    Waythomas, C.F.

    2001-01-01

    The formation of lahars and a debris avalanche during Holocene eruptions of the Spurr volcanic complex in south-central Alaska have led to the development of volcanic debris dams in the Chakachatna River valley. Debris dams composed of lahar and debris-avalanche deposits formed at least five times in the last 8000-10,000 years and most recently during eruptions of Crater Peak vent in 1953 and 1992. Water impounded by a large debris avalanche of early Holocene (?) age may have destabilized an upstream glacier-dammed lake causing a catastrophic flood on the Chakachatna River. A large alluvial fan just downstream of the debris-avalanche deposit is strewn with boulders and blocks and is probably the deposit generated by this flood. Application of a physically based dam-break model yields estimates of peak discharge (Qp) attained during failure of the debris-avalanche dam in the range 104 < Qp < 106 m3 s-1 for plausible breach erosion rates of 10-100 m h-1. Smaller, short-lived, lahar dams that formed during historical eruptions in 1953, and 1992, impounded smaller lakes in the upper Chakachatna River valley and peak flows attained during failure of these volcanic debris dams were in the range 103 < Qp < 104 m3 s-1 for plausible breach erosion rates. Volcanic debris dams have formed at other volcanoes in the Cook Inlet region, Aleutian arc, and Wrangell Mountains but apparently did not fail rapidly or result in large or catastrophic outflows. Steep valley topography and frequent eruptions at volcanoes in this region make for significant hazards associated with the formation and failure of volcanic debris dams. Published by Elsevier Science B.V.

  6. Maternal postpartum learned helplessness (LH) affects maternal care by dams and responses to the LH test in adolescent offspring.

    PubMed

    Kurata, Akiko; Morinobu, Shigeru; Fuchikami, Manabu; Yamamoto, Shigeto; Yamawaki, Shigeto

    2009-06-01

    It is known that the early environment affects the mental development of rodent and human offspring. However, it is not known specifically whether a postpartum depressive state influences the depressive state in offspring. Using learned helplessness (LH) in rats as an animal model of depression, we examined the influence of maternal postpartum LH on responses to the LH test of offspring. Dam rats were judged as LH or non-helpless (nLH) on postnatal days (PN) 2-3, and maternal behavior was recorded during PN2-14. On PN 45-46, offspring were subjected to the LH test. Plasma corticosterone (CORT) levels, hippocampal levels of glucocorticoid receptor (GR) and brain-derived neurotrophic factor (BDNF) mRNA were measured before and after the LH test in offspring. Active nursing in LH dams was significantly lower than that in nLH dams. Susceptibility to LH in the offspring of LH dams was significantly higher than in those of nLH dams, and was negatively correlated with active nursing by LH dams. The GR mRNA levels before and after the LH test were lower in the offspring of LH dams than in those of nLH dams, and the reduced basal GR mRNA and protein might have resulted in the higher CORT response after the LH test. There was no significant difference in BDNF mRNA in the offspring of LH and nLH dams. These findings suggest that early postpartum LH decreased active nursing and increased depression-like behavior in the adolescent offspring via dysfunction of the hypothalamic-pituitary-adrenal axis.

  7. Estimation of placental and lactational transfer and tissue distribution of atrazine and its main metabolites in rodent dams, fetuses, and neonates with physiologically based pharmacokinetic modeling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lin, Zhoumeng; Interdisciplinary Toxicology Program, University of Georgia, Athens, GA 30602; Fisher, Jeffrey W.

    Atrazine (ATR) is a widely used chlorotriazine herbicide, a ubiquitous environmental contaminant, and a potential developmental toxicant. To quantitatively evaluate placental/lactational transfer and fetal/neonatal tissue dosimetry of ATR and its major metabolites, physiologically based pharmacokinetic models were developed for rat dams, fetuses and neonates. These models were calibrated using pharmacokinetic data from rat dams repeatedly exposed (oral gavage; 5 mg/kg) to ATR followed by model evaluation against other available rat data. Model simulations corresponded well to the majority of available experimental data and suggest that: (1) the fetus is exposed to both ATR and its major metabolite didealkylatrazine (DACT) atmore » levels similar to maternal plasma levels, (2) the neonate is exposed mostly to DACT at levels two-thirds lower than maternal plasma or fetal levels, while lactational exposure to ATR is minimal, and (3) gestational carryover of DACT greatly affects its neonatal dosimetry up until mid-lactation. To test the model's cross-species extrapolation capability, a pharmacokinetic study was conducted with pregnant C57BL/6 mice exposed (oral gavage; 5 mg/kg) to ATR from gestational day 12 to 18. By using mouse-specific parameters, the model predictions fitted well with the measured data, including placental ATR/DACT levels. However, fetal concentrations of DACT were overestimated by the model (10-fold). This overestimation suggests that only around 10% of the DACT that reaches the fetus is tissue-bound. These rodent models could be used in fetal/neonatal tissue dosimetry predictions to help design/interpret early life toxicity/pharmacokinetic studies with ATR and as a foundation for scaling to humans. - Highlights: • We developed PBPK models for atrazine in rat dams, fetuses, and neonates. • We conducted pharmacokinetic (PK) study with atrazine in pregnant mice. • Model predictions were in good agreement with experimental rat and mouse PK data. • The fetus is exposed to atrazine/its main metabolite at levels similar to the dam. • The nursing neonate is exposed primarily to atrazine's main metabolite DACT.« less

  8. A pragmatic method for estimating seepage losses for small reservoirs with application in rural India

    NASA Astrophysics Data System (ADS)

    Oblinger, Jennifer A.; Moysey, Stephen M. J.; Ravindrinath, Rangoori; Guha, Chiranjit

    2010-05-01

    SummaryThe informal construction of small dams to capture runoff and artificially recharge ground water is a widespread strategy for dealing with water scarcity. A lack of technical capacity for the formal characterization of these systems, however, is often an impediment to the implementation of effective watershed management practices. Monitoring changes in reservoir storage provides a conceptually simple approach to quantify seepage, but does not account for the losses occurring when seepage is balanced by inflows to the reservoir and the stage remains approximately constant. To overcome this problem we evaluate whether a physically-based volume balance model that explicitly represents watershed processes, including reservoir inflows, can be constrained by a limited set of data readily collected by non-experts, specifically records of reservoir stage, rainfall, and evaporation. To assess the impact of parameter non-uniqueness associated with the calibration of the non-linear model, we perform a Monte Carlo analysis to quantify uncertainty in the total volume of water contributed to the subsurface by the 2007 monsoon for a dam located in the Deccan basalts near the village of Salri in Madhya Pradesh, India. The Monte Carlo analysis demonstrated that subsurface losses from the reservoir could be constrained with the available data, but additional measurements are required to constrain reservoir inflows. Our estimate of seepage from the reservoir (7.0 ± 0.6 × 10 4 m 3) is 3.5 times greater than the recharge volume estimated by considering reservoir volume changes alone. This result suggests that artificial recharge could be significantly underestimated when reservoir inflows are not explicitly included in models. Our seepage estimate also accounts for about 11% of rainfall occurring upstream of the dam and is comparable in magnitude to natural ground water recharge, thereby indicating that the reservoir plays a significant role in the hydrology of this small watershed.

  9. A Markov chain analysis of the movements of juvenile salmonids in the forebay of McNary Dam, Washington and Oregon, 2006-09

    USGS Publications Warehouse

    Adams, Noah S.; Hatton, Tyson W.

    2012-01-01

    Passage and survival data for yearling and subyearling Chinook salmon and juvenile steelhead were collected at McNary Dam between 2006 and 2009. These data have provided critical information for resource managers to implement structural and operational changes designed to improve the survival of juvenile salmonids as they migrate past the dam. Much of the information collected at McNary Dam was in the form of three-dimensional tracks of fish movements in the forebay. These data depicted the behavior of multiple species (in three dimensions) during different diel periods, spill conditions, powerhouse operations, and test configurations of the surface bypass structures (temporary spillway weirs; TSWs). One of the challenges in reporting three-dimensional results is presenting the information in a manner that allows interested parties to summarize the behavior of many fish over many different conditions across multiple years. To accomplish this, we investigated the feasibility of using a Markov chain analysis to characterize fish movement patterns in the forebay of McNary Dam. The Markov chain analysis is one way that can be used to summarize numerically the behavior of fish in the forebay. Numerically summarizing the behavior of juvenile salmonids in the forebay of McNary Dam using the Markov chain analysis allowed us to confirm what had been previously summarized using visualization software. For example, proportions of yearling and subyearling Chinook salmon passing the three powerhouse areas was often greater in the southern and middle areas, compared to the northern area. The opposite generally was observed for steelhead. Results of this analysis also allowed us to confirm and quantify the extent of milling behavior that had been observed for steelhead. For fish that were first detected in the powerhouse region, less than 0.10 of the steelhead, on average, passed within each of the powerhouse areas. Instead, steelhead transitioned to adjoining areas in the spillway before passing the dam. In comparison, greater than 0.20 of the Chinook salmon passed within the powerhouse areas. Less milling behavior was observed for all species for fish that first approached the spillway. Compared to the powerhouse areas, a higher proportion of fish, regardless of species, passed the spillway areas and fewer transitioned to adjoining areas in the powerhouse. In addition to quantifying what had been previously speculated about the behavior of fish in the forebay of McNary Dam, the Markov chain analysis refined our understanding of how fish behavior and passage can be influenced by changes to the operations and structure of McNary Dam. For example, the addition of TSWs to the spillway area clearly influenced the passage of fish. Previous results have been reported showing that TSWs increased the number of fish passing through non-turbine routes and the fish-track videos indicated, in general, how fish behaved before passing through the TSWs. However, the analysis presented in this report allowed us to better understand how fish moved across the face of the dam before passing the TSWs and provided a way to quantify the effect of TSW location. Installation of the TSWs in bays 22 and 20 clearly increased passage proportions through the southern one-third of the spillway area for all species, most significantly for steelhead. When the TSWs were moved to bays 19 and 20 in 2008, overall passage through the southern one-third of the spillway remained higher than 2006, but decreased from what was observed in 2007. Shifting the TSWs to the north decreased the proportion of fish passing through the TSWs and increased the number of fish that moved to adjoining areas before passing the dam. Perhaps the most interesting new information to come out of the two-step Markov chain analysis relates to how the performance of the TSWs was influenced by their proximity to the powerhouse. During 2007, the highest proportion of fish passing through TSW22 was for fish that transitioned from the powerhouse area. In contrast, a relatively low proportion of fish passed through TSW20 after coming from the powerhouse area. Instead, the proportion of fish that passed TSW20 after coming from the northern part of the spillway was twice as high as the proportion of fish that passed through TSW20 after coming from the powerhouse. During 2008, the TSW in bay 22 was moved to bay 19, leaving the TSW in bay 20 as the one closest to the powerhouse. As was the case when a TSW was located in bay 22; the proportion of fish passing TSW20 after coming from the powerhouse was greater than the proportion of fish passing through TSW20 after coming from the northern part of the spillway. Passage proportions for fish passing through TSW19, the farthest north of the two TSWs during 2008, was higher for fish that came from the northern part of the spillway compared to the proportion of fish that passed through TSW19 after coming from the powerhouse. The Markov chain analysis provided a mathematical way to characterize fish behavior in the forebay of McNary Dam and helped refine our understanding of how fish movements were influenced by operational and structural changes at McNary Dam. The Markov chain analysis also could be used to examine how future structural and operational changes proposed for McNary Dam might influence the passage of juvenile salmonids.

  10. Geomorphologically effective floods from moraine-dammed lakes in the Cordillera Blanca, Peru

    NASA Astrophysics Data System (ADS)

    Emmer, Adam

    2017-12-01

    Outburst floods originating in moraine-dammed lakes represent a significant geomorphological process as well as a specific type of threat for local communities in the Cordillera Blanca, Peru (8.5°-10° S; 77°-78° W). An exceptional concentration of catastrophic floods has been reported from the Cordillera Blanca in the first half of 20th Century (1930s-1950s), leading to thousands of fatalities. The main objective of this paper is to provide a revised and comprehensive overview of geomorphologically effective floods in the area of interest, using various documentary data sources, verified by analysis of remotely sensed images (1948-2013) and enhanced by original field data. Verified events (n = 28; 4 not mentioned before) are analysed from the perspective of spatiotemporal distribution, pre-flood conditions, causes, mechanisms and geomorphological impacts as well as socioeconomical consequences, revealing certain patterns and similar features. GLOFs are further classified according to their magnitude: 5 extreme events, 8 major events and 15 minor events are distinguished, referring to the quantified geomorphological and socioeconomical impacts. Selected moraine dams and flood deposits are dated using lichenometric dating. Special attention is given to moraine dam breaches - the most frequent type of water release with the most significant consequences. Selected major events and their consequences are studied in detail in a separate section. Finally, a general schematic model of lake formation, growth and post-flood evolution reflecting initial topographical setting and glacier retreat is introduced and the utilization of the obtained results is outlined.

  11. Mutually beneficial and sustainable management of Ethiopian and Egyptian dams in the Nile Basin

    NASA Astrophysics Data System (ADS)

    Habteyes, Befekadu G.; Hasseen El-bardisy, Harb A. E.; Amer, Saud A.; Schneider, Verne R.; Ward, Frank A.

    2015-10-01

    Ongoing pressures from population growth, recurrent drought, climate, urbanization and industrialization in the Nile Basin raise the importance of finding viable measures to adapt to these stresses. Four tributaries of the Eastern Nile Basin contribute to supplies: the Blue Nile (56%), White Nile-Albert (14%), Atbara (15%) and Sobat (15%). Despite much peer reviewed work addressing conflicts on the Nile, none to date has quantitatively examined opportunities for discovering benefit sharing measures that could protect negative impacts on downstream water users resulting from new upstream water storage developments. The contribution of this paper is to examine the potential for mutually beneficial and sustainable benefit sharing measures from the development and operation of the Grand Ethiopian Renaissance Dam while protecting baseline flows to the downstream countries including flows into the Egyptian High Aswan Dam. An integrated approach is formulated to bring the hydrology, economics and institutions of the region into a unified framework for policy analysis. A dynamic optimization model is developed and applied to identify the opportunities for Pareto Improving measures to operate these two dams for the four Eastern Nile Basin countries: Ethiopia, South Sudan, Sudan, and Egypt. Results indicate a possibility for one country to be better off (Ethiopia) and no country to be worse off from a managed operation of these two storage facilities. Still, despite the optimism of our results, considerable diplomatic negotiation among the four riparians will be required to turn potential gains into actual welfare improvements.

  12. Survival Estimates for the Passage of Spring-Migrating Juvenile Salmonids through Snake and Columbia River Dams and Reservoirs, 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Faulkner, James R.; Smith, Steven G.; Muir, William D.

    2009-06-23

    In 2008, the National Marine Fisheries Service completed the sixteenth year of a study to estimate survival and travel time of juvenile salmonids Oncorhynchus spp. passing through dams and reservoirs on the Snake and Columbia Rivers. All estimates were derived from detections of fish tagged with passive integrated transponder (PIT) tags. We PIT tagged and released a total of 18,565 hatchery steelhead O. mykiss, 15,991 wild steelhead, and 9,714 wild yearling Chinook salmon O. tshawytscha at Lower Granite Dam in the Snake River. In addition, we utilized fish PIT tagged by other agencies at traps and hatcheries upstream from themore » hydropower system and at sites within the hydropower system in both the Snake and Columbia Rivers. These included 122,061 yearling Chinook salmon tagged at Lower Granite Dam for evaluation of latent mortality related to passage through Snake River dams. PIT-tagged smolts were detected at interrogation facilities at Lower Granite, Little Goose, Lower Monumental, Ice Harbor, McNary, John Day, and Bonneville Dams and in the PIT-tag detector trawl operated in the Columbia River estuary. Survival estimates were calculated using a statistical model for tag-recapture data from single release groups (the single-release model). Primary research objectives in 2008 were to: (1) estimate reach survival and travel time in the Snake and Columbia Rivers throughout the migration period of yearling Chinook salmon and steelhead, (2) evaluate relationships between survival estimates and migration conditions, and (3) evaluate the survival estimation models under prevailing conditions. This report provides reach survival and travel time estimates for 2008 for PIT-tagged yearling Chinook salmon (hatchery and wild), hatchery sockeye salmon O. nerka, hatchery coho salmon O. kisutch, and steelhead (hatchery and wild) in the Snake and Columbia Rivers. Additional details on the methodology and statistical models used are provided in previous reports cited here. Survival and detection probabilities were estimated precisely for most of the 2008 yearling Chinook salmon and steelhead migrations. Hatchery and wild fish were combined in some of the analyses. For yearling Chinook salmon, overall percentages for combined release groups used in survival analyses in the Snake River were 80% hatchery-reared and 20% wild. For steelhead, the overall percentages were 65% hatchery-reared and 35% wild. Estimated survival from the tailrace of Lower Granite Dam to the tailrace of Little Goose Dam averaged 0.939 for yearling Chinook salmon and 0.935 for steelhead.« less

  13. Hydraulic modeling analysis of the Middle Rio Grande River from Cochiti Dam to Galisteo Creek, New Mexico

    Treesearch

    Susan J. Novak

    2006-01-01

    Sedimentation problems with the Middle Rio Grande have made it a subject of study for several decades for many government agencies involved in its management and maintenance. Since severe bed aggradation in the river began in the late 1800's, causing severe flooding and destroying farmland, several programs have been developed to restore the river while...

  14. Multiobjective Risk Partitioning: An Application to Dam Safety Risk Analysis

    DTIC Science & Technology

    1988-04-01

    Charlottesville, VA 22901 Fort Belvoir, VA 22060-5586 Ba. NAME OF FUNDING/SPONSORING 8b. OFFICE SYMBOL 9. PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER...Resources. The successful collaboration throughout the study between the two groups is indeed a model ef an effective partnership among government ...catchment response shows good agreement with historical data. Wood and Hebson [19851 also developed a dimensionless geomorphologic unit hydrograph (DGUH

  15. Terrorism Risk Modeling for Intelligence Analysis and Infrastructure Protection

    DTIC Science & Technology

    2007-01-01

    comparatively high risk of CBRN attacks. Estimates of sabotage risk are highly dependent on proximity of nuclear power plants , chemical plants , or oil...and casinos, airports, nuclear power plants 3 Military, train and subway stations, stadiums, bridges and tunnels 4 Industrial facilities, oil and...airspace zones 8 Power plants , dams, railway networks levels. Collecting and incorporating such data for specific localities or industry sectors would

  16. Modeling the Impact of controlled flow and sediment releases for the restoration of the Nile Delta, Egypt

    NASA Astrophysics Data System (ADS)

    Al-Zaidi, B. M.; Moussa, A.; Viparelli, E.

    2017-12-01

    The construction of the High and Old Aswan Dams and of barrages significantly altered the flow and the sediment transport regimes in the Egyptian reach of the Nile River. The field data collected by the Nile Research Institute show that the post-High Aswan Dam Nile River hydrology is characterized by reductions of more than 70% in flow discharge and 98% in sediment load compared to pre-High Aswan Dam conditions. A significant portion of discharge released from the dams is diverted at the barrages for agricultural ( 80%) and municipal ( 15%) uses. Thus, virtually no water is reaching the Nile Delta and the Mediterranean Sea. Consequently, the sediment load delivered to the Mediterranean Sea is negligible compared to pre-dam conditions. Consequences of the flow regulation are delta wide wetland loss and shoreline retreat, widespread delta pollution, reduction soil quality, salination of cultivated land, wetland losses, and saltwater intrusion in the groundwater. Here we present the second part of a feasibility study for the restoration of the Nile River-Delta system characterized by controlled flow releases and sediment augmentations downstream of the High Aswan Dam. The controlled flow releases are obtained by regulating the current releases from the High Aswan Dam at the Old Aswan Dam, which is located 6.5 km downstream of the High Aswan Dam. Previous studies showed that 10 billion m3 of water can be saved annually by improving the Egyptian irrigation system. Here we propose to use the saved water to increase the water discharge to the Nile Delta, i.e., the total volume of water released from the dams does not change, what changes is the water used and the imposed hydrograph. We modulate the river flow by storing the saved water during the agriculture season upstream of the Old Aswan Dam and releasing it in the months coinciding with the natural river flood season. It is important to note that here we are considering the simplest possible scenario for water storage. In reality, additional storage volumes are available upstream of the major barrages, and these volumes can also be used during the proposed restoration project. The study consists in the implementation and validation of a laterally averaged delta growth model to quantify the impact of the proposed restoration project on the Nile Delta in terms of changes in shoreline position and channel-floodplain characteristics under the predicted rates of sea level rise.

  17. Behavior, passage, and downstream migration of juvenile Chinook salmon from Detroit Reservoir to Portland, Oregon, 2014–15

    USGS Publications Warehouse

    Kock, Tobias J.; Beeman, John W.; Hansen, Amy C.; Hansel, Hal C.; Hansen, Gabriel S.; Hatton, Tyson W.; Kofoot, Eric E.; Sholtis, Matthew D.; Sprando, Jamie M.

    2015-11-16

    A Cormack-Jolly-Seber mark-recapture model was developed to provide reach-specific survival estimates for juvenile Chinook salmon. A portion of the tagged population overwintered in the Willamette River Basin and outmigrated several months after release. As a result, survival estimates from the model would have been negatively biased by factors such as acoustic tag failure and tag loss. Data from laboratory studies were incorporated into the model to provide survival estimates that accounted for these factors. In the North Santiam River between Minto Dam and the Bennett Dam complex, a distance of 37.2 kilometers, survival was estimated to be 0.844 (95-percent confidence interval 0.795–0.893). The survival estimate for the 203.7 kilometer reach between the Bennett Dam complex and Portland, Oregon, was 0.279 (95-percent confidence interval 0.234–0.324), and included portions of the North Santiam, Santiam, and Willamette Rivers. The cumulative survival estimate in the 240.9 kilometer reach from the Minto Dam tailrace to Portland was 0.236 (95-percent confidence interval 0.197–0.275).

  18. Examining the economic impacts of hydropower dams on property values using GIS.

    PubMed

    Bohlen, Curtis; Lewis, Lynne Y

    2009-07-01

    While the era of dam building is largely over in the United States, globally dams are still being proposed and constructed. The articles in this special issue consider many aspects and impacts of dams around the world. This paper examines dam removal and the measurement of the impacts of dams on local community property values. Valuable lessons may be found. In the United States, hundreds of small hydropower dams will come up for relicensing in the coming decade. Whether or not the licenses are renewed and what happens to the dams if the licenses expires is a subject of great debate. Dams are beginning to be removed for river restoration and fisheries restoration and these "end-of-life" decisions may offer lessons for countries proposing or currently building small (and large) hydropower dams. What can these restoration stories tell us? In this paper, we examine the effects of dams along the Penobscot River in Maine (USA) on residential property values. We compare the results to findings from a similar (but ex post dam removal) data set for properties along the Kennebec river in Maine, where the Edwards Dam was removed in 1999. The Penobscot River Restoration Project, an ambitious basin-wide restoration effort, includes plans to remove two dams and decommission a third along the Penobscot River. Dam removal has significant effects on the local environment, and it is reasonable to anticipate that environmental changes will themselves be reflected in changes in property values. Here we examine historical real estate transaction data to examine whether landowners pay a premium or penalty to live near the Penobscot River or near a hydropower generating dam. We find that waterfront landowners on the Penobscot or other water bodies in our study area pay approximately a 16% premium for the privilege of living on the water. Nevertheless, landowners pay LESS to live near the Penobscot River than they do to live further away, contrary to the expectation that bodies of water function as real estate amenities and boost local property values. Results with respect to the effect of proximity to hydropower generating plants are equivocal. Homeowners pay a small premium for houses close to hydropower dams in our region, but the statistical significance of that result depends on the specific model form used to estimate the effect. Consideration of the social and economic impacts of dam removal-based river restoration can complement studies of the ecological impacts of the practice. Such studies help us understand the extent to which human society's subjective perception of value of aquatic ecosystems relates to objective measures of ecosystem health. The paper also illustrates how geographic information systems (GIS) can help inform these analyses.

  19. A Markov chain analysis of the movements of juvenile salmonids, including sockeye salmon, in the forebay of McNary Dam, Washington and Oregon, 2006-09

    USGS Publications Warehouse

    Adams, Noah S.; Hatton, Tyson W.

    2012-01-01

    Passage and survival data were collected at McNary Dam between 2006 and 2009. These data have provided critical information for resource managers to implement structural and operational changes designed to improve the survival of juvenile salmonids as they migrate past the dam. Much of the valuable information collected at McNary Dam was in the form of three-dimensional (hereafter referred to as 3-D) tracks of fish movements in the forebay. These data depicted the behavior of multiple species (in three dimensions) during different diel periods, spill conditions, powerhouse operations, and testing of the surface bypass structures (temporary spillway weirs; TSWs). One of the challenges in reporting 3-D results is presenting the information in a manner that allows interested parties to summarize the behavior of many fish over many different conditions across multiple years. To accomplish this, we used a Markov chain analysis to characterize fish movement patterns in the forebay of McNary Dam. The Markov chain analysis allowed us to numerically summarize the behavior of fish in the forebay. This report is the second report published in 2012 that uses this analytical method. The first report included only fish released as part of the annual studies conducted at McNary Dam. This second report includes sockeye salmon that were released as part of studies conducted by the Chelan and Grant County Public Utility Districts at mid-Columbia River dams. The studies conducted in the mid-Columbia used the same transmitters as were used for McNary Dam studies, but transmitter pulse width was different between studies. Additionally, no passive integrated transponder tags were implanted in sockeye salmon. Differences in transmitter pulse width resulted in lower detection probabilities for sockeye salmon at McNary Dam. The absence of passive integrated transponder tags prevented us from determining if fish passed the powerhouse through the juvenile bypass system (JBS) or turbines. To facilitate comparison among species in this report, we combined JBS and turbine passage for yearling Chinook salmon, steelhead, and subyearling Chinook salmon even though we were able to differentiate between passage through the JBS or turbines for these three species. Information on passage proportions through the JBS and turbines can be found in the first report. Numerically summarizing the behavior of juvenile salmonids in the forebay of McNary Dam using the Markov chain analysis allowed us to confirm what had been previously summarized using visualization software. For example, within the powerhouse region, passage proportions among the three powerhouse areas were often greater in the southern and middle areas of the powerhouse compared to the northern area of the powerhouse for yearling and subyearling Chinook salmon. The opposite generally was observed for steelhead. The results of this analysis also allowed us to confirm and quantify the extent of milling behavior that was observed for steelhead. For fish that were first detected in the powerhouse region, less than 0.10 of the steelhead, on average, passed within each of the powerhouse areas. Instead, steelhead transitioned to adjoining areas in the spillway before passing the dam. In comparison, greater than 0.20 of the Chinook salmon passed within each of the powerhouse areas. Less milling behavior was observed for all species for fish that first approached the spillway. Compared to the powerhouse areas, a higher proportion of fish, regardless of species, passed the spillway areas and fewer transitioned to adjoining areas in the powerhouse. In addition to quantifying what had been previously speculated about the behavior of fish in the forebay of McNary Dam, the Markov chain analysis refined our understanding of how fish behavior and passage can be influenced by changes to the operations and structure of McNary Dam. For example, the addition of TSWs to the spillway area clearly influenced the passage of fish. Previous results have been reported showing that TSWs increased passage through non-turbine routes and the fish-track videos indicated, in general, how fish behaved before passing the TSWs. However, the analysis presented in this report allowed us to better understand how fish transitioned across the face of the dam before passing the TSWs and resulted in a quantitative way to measure the effect of moving the location of the TSWs from year to year. Installation of the TSWs in bays 22 and 20 clearly increased passage proportions through the southern one-third of the spillway area for all species, most significantly for steelhead. When the TSWs were moved to bays 19 and 20 in 2008, overall passage through the southern one-third of the spillway remained higher than 2006, but decreased from what was observed in 2007. Shifting the TSWs to the north decreased the proportion of fish passing through the TSWs and increased the number of fish that transitioned to adjoining areas before passing the dam. Perhaps the most interesting new information to come out of the two-step Markov chain analysis relates to how the performance of the TSWs was influenced by their proximity to the powerhouse. During 2007, the highest proportion of fish passing through TSW 22 was for fish that transitioned from the powerhouse area. In contrast, a relatively low proportion of fish passed through TSW 20 after coming from the powerhouse area. Instead, the proportion of fish that passed TSW 20 after coming from the northern part of the spillway was twice as high as the proportion of fish that passed through TSW 20 after coming from the powerhouse. During 2008, the TSW in bay 22 was moved to bay 19, leaving the TSW in bay 20 as the one closest to the powerhouse. As was the case when a TSW was located in bay 22, the proportion of fish passing through TSW 20 after coming from the powerhouse was higher than the proportion of fish passing TSW 20 after coming from the northern part of the spillway. Passage proportions for fish passing through TSW 19, the farthest north of the two TSWs during 2008, was higher for fish that came from the northern part of the spillway compared to the proportion of fish that passed through TSW 19 after coming from the powerhouse. The Markov chain analysis provided a mathematical way to characterize fish behavior in the forebay of McNary Dam and helped refine our understanding of how fish movements were influenced by operational and structural changes at the dam. The numerical information used to quantify the behavior of fish also can be used to construct simulations to examine how proposed fish passage structures might influence passage of juvenile salmonids. To demonstrate this, we used the results of the Markov chain analysis to examine how a virtual fish collector located in the center of the powerhouse might influence passage of juvenile salmonids at McNary Dam.

  20. Application of Bayesian networks in a hierarchical structure for environmental risk assessment: a case study of the Gabric Dam, Iran.

    PubMed

    Malekmohammadi, Bahram; Tayebzadeh Moghadam, Negar

    2018-04-13

    Environmental risk assessment (ERA) is a commonly used, effective tool applied to reduce adverse effects of environmental risk factors. In this study, ERA was investigated using the Bayesian network (BN) model based on a hierarchical structure of variables in an influence diagram (ID). ID facilitated ranking of the different alternatives under uncertainty that were then used to evaluate comparisons of the different risk factors. BN was used to present a new model for ERA applicable to complicated development projects such as dam construction. The methodology was applied to the Gabric Dam, in southern Iran. The main environmental risk factors in the region, presented by the Gabric Dam, were identified based on the Delphi technique and specific features of the study area. These included the following: flood, water pollution, earthquake, changes in land use, erosion and sedimentation, effects on the population, and ecosensitivity. These risk factors were then categorized based on results from the output decision node of the BN, including expected utility values for risk factors in the decision node. ERA was performed for the Gabric Dam using the analytical hierarchy process (AHP) method to compare results of BN modeling with those of conventional methods. Results determined that a BN-based hierarchical structure to ERA present acceptable and reasonable risk assessment prioritization in proposing suitable solutions to reduce environmental risks and can be used as a powerful decision support system for evaluating environmental risks.

  1. Estimating reach-specific fish movement probabilities in rivers with a Bayesian state-space model: application to sea lamprey passage and capture at dams

    USGS Publications Warehouse

    Holbrook, Christopher M.; Johnson, Nicholas S.; Steibel, Juan P.; Twohey, Michael B.; Binder, Thomas R.; Krueger, Charles C.; Jones, Michael L.

    2014-01-01

    Improved methods are needed to evaluate barriers and traps for control and assessment of invasive sea lamprey (Petromyzon marinus) in the Great Lakes. A Bayesian state-space model provided reach-specific probabilities of movement, including trap capture and dam passage, for 148 acoustic tagged invasive sea lamprey in the lower Cheboygan River, Michigan, a tributary to Lake Huron. Reach-specific movement probabilities were combined to obtain estimates of spatial distribution and abundance needed to evaluate a barrier and trap complex for sea lamprey control and assessment. Of an estimated 21 828 – 29 300 adult sea lampreys in the river, 0%–2%, or 0–514 untagged lampreys, could have passed upstream of the dam, and 46%–61% were caught in the trap. Although no tagged lampreys passed above the dam (0/148), our sample size was not sufficient to consider the lock and dam a complete barrier to sea lamprey. Results also showed that existing traps are in good locations because 83%–96% of the population was vulnerable to existing traps. However, only 52%–69% of lampreys vulnerable to traps were caught, suggesting that traps can be improved. The approach used in this study was a novel use of Bayesian state-space models that may have broader applications, including evaluation of barriers for other invasive species (e.g., Asian carp (Hypophthalmichthys spp.)) and fish passage structures for other diadromous fishes.

  2. Annual Peak-Flow Frequency Characteristics and (or) Peak Dam-Pool-Elevation Frequency Characteristics of Dry Dams and Selected Streamflow-Gaging Stations in the Great Miami River Basin, Ohio

    USGS Publications Warehouse

    Koltun, G.F.

    2009-01-01

    This report describes the results of a study to determine frequency characteristics of postregulation annual peak flows at streamflow-gaging stations at or near the Lockington, Taylorsville, Englewood, Huffman, and Germantown dry dams in the Miami Conservancy District flood-protection system (southwestern Ohio) and five other streamflow-gaging stations in the Great Miami River Basin further downstream from one or more of the dams. In addition, this report describes frequency characteristics of annual peak elevations of the dry-dam pools. In most cases, log-Pearson Type III distributions were fit to postregulation annual peak-flow values through 2007 (the most recent year of published peak-flow values at the time of this analysis) and annual peak dam-pool storage values for the period 1922-2008 to determine peaks with recurrence intervals of 2, 5, 10, 25, 50, 100, 200, and 500 years. For one streamflow-gaging station (03272100) with a short period of record, frequency characteristics were estimated by means of a process involving interpolation of peak-flow yields determined for an upstream and downstream gage. Once storages had been estimated for the various recurrence intervals, corresponding dam-pool elevations were determined from elevation-storage ratings provided by the Miami Conservancy District.

  3. National Dam Inspection Program. Upper Pigeon Hill Dam. (NDI I.D. Number PA-00340, PennDER I.D. Number 67-5) Susquehanna River Basin, Gitts Run, York County, Pennsylvania. Phase I Inspection Report,

    DTIC Science & Technology

    1980-03-01

    recommended guidelines, the Spillway Design Flood (SDF) ranges between the 1 /2-PMF (Probable Maximum Flood) and PMF. Since the dam is near the lower end of...overtopping. A breach analysis indicates that failure under 1 /2-PMF conditions would probably not lead to increased property damage or loss of life at...ii OVERVIEW PHOTOGRAPH ......... .................. V TABLE OF CONTENTS ......... ................... vi SECTION 1 - GENERAL INFORMATION

  4. Feasibility of groundwater recharge dam projects in arid environments

    NASA Astrophysics Data System (ADS)

    Jaafar, H. H.

    2014-05-01

    A new method for determining feasibility and prioritizing investments for agricultural and domestic recharge dams in arid regions is developed and presented. The method is based on identifying the factors affecting the decision making process and evaluating these factors, followed by determining the indices in a GIS-aided environment. Evaluated parameters include results from field surveys and site visits, land cover and soils data, precipitation data, runoff data and modeling, number of beneficiaries, domestic irrigation demand, reservoir objectives, demography, reservoirs yield and reliability, dam structures, construction costs, and operation and maintenance costs. Results of a case study on more than eighty proposed dams indicate that assessment of reliability, annualized cost/demand satisfied and yield is crucial prior to investment decision making in arid areas. Irrigation demand is the major influencing parameter on yield and reliability of recharge dams, even when only 3 months of the demand were included. Reliability of the proposed reservoirs as related to their standardized size and net inflow was found to increase with increasing yield. High priority dams were less than 4% of the total, and less priority dams amounted to 23%, with the remaining found to be not feasible. The results of this methodology and its application has proved effective in guiding stakeholders for defining most favorable sites for preliminary and detailed design studies and commissioning.

  5. Social And Environmental Considerations In The Water Management Of A Dam-regulated African River. Implications Of The Artificial Flood Releases In The Lower Delta Of The Senegal River.

    NASA Astrophysics Data System (ADS)

    Duvail, S.

    In the 1970's the governments of Mali, Senegal and Mauritania created the Organi- sation pour la Mise en Valeur du fleuve Sénégal (OMVS) and in the 1980's built two large dams in order to develop irrigated agriculture, produce hydropower and facilitate river navigation. These different objectives have been met only very partially and the negative impacts are numerous, especially in the lower basin. The high and constant water level in the Diama reservoir has nefarious impacts on ecosystems, on human and animal health and on social equilibria. Upstream of the reservoir there is an excess of stagnant fresh water while the estuarine part downstream of the dam lacks fresh wa- ter. The traditional stakeholders of the floodplain (fishermen, livestock keepers and gatherers) had to migrate or reconvert to other activities. For institutional reasons and because irrigated agriculture was the priority, their needs were not taken into account for the Diama dam management. Still, it is possible to define a more democratic water management, which could reconcile the water needs of the large-scale rice farms with the support of local livelihoods. Artificial flood releases were used to simulate pre- dam hydraulics. First tested at a scale of a few thousand hectares they were gradually expanded to cover larger areas. The water needs (in terms of flood timing and dura- tion, water level and water quality) of the local stakeholders and the ecosystems were identified. A hydraulic model (Mike 11 of DHI, Water and Environment) was applied. When associated with a digital elevation model and a geographic information system (Arc view of Esri), the model enabled us to test several flood scenarios and to sup- port the adaptive management approach. At a larger scale, proposals are made for the management of the Diama dam, which take into account the downstream water needs. The research presented has to be seen in the framework of the management of dams on strongly seasonal African rivers. The challenge is to use of artificial flood releases incorporating local development objectives and environmental water needs with the large scale sectoral objectives for which the dams are being designed.

  6. Using computer models to design gully erosion control structures for humid northern Ethiopia

    USDA-ARS?s Scientific Manuscript database

    Classic gully erosion control measures such as check dams have been unsuccessful in halting gully formation and growth in the humid northern Ethiopian highlands. Gullies are typically formed in vertisols and flow often bypasses the check dams as elevated groundwater tables make gully banks unstable....

  7. Model study of RCC stepped spillways with sloped converging training walls

    USDA-ARS?s Scientific Manuscript database

    Approximately half of the over 11,000 small watershed dams designed and constructed under the supervision of the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) will reach the end of their planned service life within the next 10 years. Many of these dams...

  8. Modelling the impact of large dams on flows and hydropower production of the Sekong, Sesan and Srepok Rivers in the Mekong Basin

    NASA Astrophysics Data System (ADS)

    Piman, T.; Cochrane, T. A.; Arias, M. E.

    2013-12-01

    Water flow patterns in the Mekong River and its tributaries are changing due to water resources development, particularly as a result of on-going rapid hydropower development of tributaries for economic growth. Local communities and international observers are concerned that alterations of natural flow patterns will have great impacts on biodiversity, ecosystem services, food securing and livelihood in the basin. There is also concern that un-coordinated dam development will have an adverse impact on energy production potential of individual hydropower plants. Of immediate concern is the proposed hydropower development in the transboundary Srepok, Sesan and Srekong (3S) Basin, which contributes up to 20% of the Mekong's annual flows, has a large potential for energy production, and provides critical ecosystem services to local people and the downstream Tonle Sap Lake and the Mekong delta. To assess the magnitude of potential changes in flows and hydropower production, daily flows were simulated over 20 years (1986-2005) using the SWAT and HEC ResSim models for a range of dam development and operations scenarios. Simulations of all current and proposed hydropower development in the 3S basin (41 dams) using an operation scheme to maximize electricity production will increase average dry seasonal flows by 88.1% while average wet seasonal flows decrease by 24.7% when compared to the baseline (no dams) scenario, About 55% of dry season flows changes are caused by the seven largest proposed dams (Lower Srepok 3, Lower Srepok4, Lower Sesan 3, Lower Sesan and Srepok 2, Xekong 5, Xekong 4, and Xe Xou). The total active storage of the existing and ongoing hydropower projects is only 6,616 million m3 while the cumulative active storage of the seven large proposed dams is 17,679 million m3. The Lower Srepok 3 project causes the highest impact on seasonal flow changes. Average energy production of the existing and ongoing hydropower projects is 73.2 GWh/day. Additional benefits from energy production of the seven large proposed dams (33.0 GWh/day) are less than half compared to the cumulative benefits of the exiting and ongoing projects. In total, potential energy production of all dams is 129.1 GWh/day. Cascade dam simulations, under an independent operation regime, result in high electricity production of downstream dams, particularly of small storage dams. Hourly flow alterations, however, can be significant due to intra daily reservoir operations and warrant further study as well as impact of climate change on flows and hydropower operation. Strategic site selection and coordinated reservoir operations between countries and dam operators are necessary to achieve an acceptable level of energy production in the basin and mitigate negative impacts to seasonal flow patterns which sustain downstream ecosystem productivity and livelihoods.

  9. Survival of juvenile chinook salmon and coho salmon in the Roza Dam fish bypass and in downstream reaches of the Yakima River, Washington, 2016

    USGS Publications Warehouse

    Kock, Tobias J.; Perry, Russell W.; Hansen, Amy C.

    2016-12-22

    Estimates of juvenile salmon survival are important data for fishery managers in the Yakima River Basin. Radiotelemetry studies during 2012–14 showed that tagged juvenile Chinook salmon (Oncorhynchus tshawytscha) that passed through the fish bypass at Roza Dam had lower survival than fish that passed through other routes at the dam. That study also identified flow-survival relationships in the reaches between the Roza Dam tailrace and Sunnyside Dam. During 2012–14, survival also was estimated through reaches downstream of Sunnyside Dam, but generally, sample sizes were low and the estimates were imprecise. In 2016, we conducted an evaluation using acoustic cameras and acoustic telemetry to build on information collected during the previous study. The goal of the 2016 research was to identify areas where mortality occurs in the fish bypass at Roza Dam, and to estimate reach-specific survival in reaches downstream of the dam. The 2016 study included juvenile Chinook salmon and coho salmon (O. kisutch).Three acoustic cameras were used to observe fish behavior (1) near the entrances to the fish bypass, (2) at a midway point in the fish bypass (convergence vault), and (3) at the bypass outfall. In total, 504 hours of acoustic camera footage was collected at these locations. We determined that smolt-sized fish (95–170 millimeters [mm]) were present in the highest proportions at each location, but predator-sized fish (greater than 250 mm) also were present at each site. Fish presence generally peaked during nighttime hours and crepuscular periods, and was low during daytime hours. In the convergence vault, smolt-sized fish exhibited holding behavior patterns, which may explain why some fish delayed while passing through the bypass.Some of the acoustic-tagged fish were delayed in the fish bypass following release, but there was no evidence to suggest that they experienced higher mortality than fish that were released at the bypass outfall or downstream of the dam. Most of the tagged fish that were released in the fish bypass moved downstream and re-entered the river within 12 hours, but 9.8 percent of the Chinook salmon and 15.7 percent of the coho salmon remained in the bypass for 2.5–17.4 days. We developed a set of models for Chinook salmon and coho salmon and used model selection to determine if release site was an important predictor of survival of tagged fish. The models that provided the best fit to the Chinook salmon and coho salmon datasets did not include release site as a covariate. Furthermore, survival estimates for groups of fish from the various release sites were nearly identical for both species. Based on these observations, it appears that passage through the fish bypass did not result in increased mortality relative to groups of fish released downstream of the bypass.Juvenile Chinook salmon migrated downstream faster than juvenile coho salmon and survival for each species varied with release timing. Median travel time from release at Roza Dam to arrival at a detection gate located at river kilometer (rkm) 527.8 on the Columbia River was 15.4 days for Chinook salmon and 37.4 days for coho salmon. Cumulative survival from Roza Dam to the Columbia River detection gate ranged from 0.299 to 0.678 for Chinook salmon, and from 0.321 to 0.627 for coho salmon. Survival was highest for both species when tagged fish were released in mid-April and lowest when tagged fish were released in early-May. Reach-specific survival estimates were standardized to create estimates that described survival per 100 rkm, which showed that survival was very low (less than 0.500) for some release groups, particularly in the Roza, Sunnyside, and Chandler diversion reaches. A more extensive analysis of reach-specific survival is planned for this dataset, which should provide insights into covariates that affected survival during 2016.

  10. Survival Estimates for the Passage of Juvenile Salmonids through Snake River Dams and Reservoirs, 1994 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muir, William D.

    1995-02-01

    In 1994, the National Marine Fisheries Service and the University of Washington completed the second year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through the dams and reservoirs of the Snake River. Actively migrating smolts were collected at selected locations above, at, and below Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Survival estimates were calculated using the Single-Release, Modified Single-Release, and Paired-Release Models.

  11. Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.

    This report presents survival, behavioral, and fish passage results for tagged yearling Chinook salmon and juvenile steelhead as part of a survival study conducted at John Day Dam during spring 2011. This study was designed to evaluate the passage and survival of yearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a paired-release survival model.

  12. The hydrological modeling in terms of determining the potential European beaver effect

    NASA Astrophysics Data System (ADS)

    Szostak, Marta; Jagodzińska, Jadwiga

    2017-06-01

    The objective of the paper was the hydrological analysis, in terms of categorizing main watercourses (based on coupled catchments) and marking areas covered by potential impact of the occurrence and activities of the European beaver Castor fiber. At the analysed area - the Forest District Głogów Małopolski there is a population of about 200 beavers in that Forest District. Damage inflicted by beavers was detected on 33.0 ha of the Forest District, while in the area of 13.9 ha the damage was small (below 10%). The monitoring of the beavers' behaviour and the analysis of their influence on hydrology of the area became an important element of using geoinformationtools in the management of forest areas. ArcHydro ArcGIS Esri module was applied, as an integrated set of tools for hydrographical analysis and modelling. Further steps of the procedure are hydrologic analyses such as: marking river networks on the DTM, filling holes, making maps of the flow direction, making the map of the accumulation flow, defining and segmentation of streams, marking elementary basins, marking coupled basins, making dams in the places, where beavers occur and localization of the area with a visible impact of damming. The result of the study includes maps prepared for the Forest District: the map of main rivers and their basins, categories of watercourses and compartments particularly threatened by beaver's foraging.

  13. Pulsational Pair-instability Model for Superluminous Supernova PTF12dam:Interaction and Radioactive Decay

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tolstov, Alexey; Nomoto, Ken’ichi; Blinnikov, Sergei

    2017-02-01

    Being a superluminous supernova, PTF12dam can be explained by a {sup 56}Ni-powered model, a magnetar-powered model, or an interaction model. We propose that PTF12dam is a pulsational pair-instability supernova, where the outer envelope of a progenitor is ejected during the pulsations. Thus, it is powered by a double energy source: radioactive decay of {sup 56}Ni and a radiative shock in a dense circumstellar medium. To describe multicolor light curves and spectra, we use radiation-hydrodynamics calculations of the STELLA code. We found that light curves are well described in the model with 40 M {sub ⊙} ejecta and 20–40 M {submore » ⊙} circumstellar medium. The ejected {sup 56}Ni mass is about 6 M {sub ⊙}, which results from explosive nucleosynthesis with large explosion energy (2–3)×10{sup 52} erg. In comparison with alternative scenarios of pair-instability supernova and magnetar-powered supernova, in the interaction model, all the observed main photometric characteristics are well reproduced: multicolor light curves, color temperatures, and photospheric velocities.« less

  14. Geomorphic and vegetation changes in a meandering dryland river regulated by a large dam, Sauce Grande River, Argentina

    NASA Astrophysics Data System (ADS)

    Casado, Ana; Peiry, Jean-Luc; Campo, Alicia M.

    2016-09-01

    This paper investigates post-dam geomorphic and vegetation changes in the Sauce Grande River, a meandering dryland river impounded by a large water-conservation dam. As the dam impounds a river section with scarce influence of tributaries, sources for fresh water and sediment downstream are limited. Changes were inspected based on (i) analysis of historical photographs/imagery spanning pre- (1961) and post-dam (1981, 2004) channel conditions for two river segments located above and below the dam, and (ii) field survey of present channel conditions for a set of eight reference reaches along the river segments. Whilst the unregulated river exhibited active lateral migration with consequent adjustments of the channel shape and size, the river section below the dam was characterized by (i) marked planform stability (93 to 97%), and by (ii) vegetation encroachment leading to alternating yet localized contraction of the channel width (up to 30%). The present river displays a moribund, stable channel where (i) redistribution of sediment along the river course no longer occurs and (ii) channel forms constitute a remnant of a fluvial environment created before closing the dam, under conditions of higher energy. In addition to providing new information on the complex geomorphic response of dryland rivers to impoundment, this paper represents the very first geomorphic assessment of the regulated Sauce Grande and therefore provides an important platform to underpin further research assessing the geomorphic state of this highly regulated dryland river.

  15. Measured and simulated runoff to the lower Charles River, Massachusetts, October 1999-September 2000

    USGS Publications Warehouse

    Zarriello, Phillip J.; Barlow, Lora K.

    2002-01-01

    The lower Charles River, the water body between the Watertown Dam and the New Charles River Dam, is an important recreational resource for the Boston, Massachusetts, metropolitan area, but impaired water quality has affected its use. The goal of making this resource fishable and swimmable requires a better understanding of combined-sewer-overflow discharges, non-combined-sewer-overflow stormwater runoff, and constituent loads. This report documents the modeling effort used to calculate non-combined-sewer-overflow runoff to the lower Charles River. During the 2000 water year, October 1, 1999?September 30, 2000, the U.S. Geological Survey collected precipitation data at Watertown Dam and compiled data from five other precipitation gages in or near the watershed. In addition, surface-water discharge data were collected at eight sites?three relatively homogenous land-use sites, four major tributary sites, and the Charles River at Watertown Dam, which is the divide between the upper and lower watersheds. The precipitation and discharge data were used to run and calibrate Stormwater Management Models developed for the three land-use subbasins (single-family, multi-family, and commercial), and the two tributary subbasins (Laundry and Faneuil Brooks). These calibrated models were used to develop a sixth model to simulate 54 ungaged outfalls to the lower Charles River. Models developed by the U.S. Geological Survey at gaged sites were calibrated with up to 24 storms. Each model was evaluated by comparing simulated discharge against measured discharge for all storms with appreciable precipitation and reliable discharge data. The model-fit statistics indicated that the models generally were well calibrated to peak discharge and runoff volumes. The model fit of the commercial land-use subbasin was not as well calibrated compared to the other models because the measured flows appear to be affected by variable conditions not represented in the model. A separate Stormwater Management Model of the Stony Brook Subbasin previously developed by others was evaluated with the newly collected data from this study; this model had a model fit comparable to the models developed by the U.S. Geological Survey. The total annual runoff to the lower Charles River during the 2000 water year, not including contributions from combined-sewer-overflows except from the Stony Brook Subbasin, was 16,500 million cubic feet; 92 percent of the inflow was from the Charles River above Watertown Dam, 3 percent was from the Stony Brook Subbasin, 2 percent was from the Muddy River Subbasin, and less than 1 percent was from the combined inflows of Laundry and Faneuil Brooks. The remaining ungaged drainage area contributed about 2 percent of the total annual inflow to the lower Charles River. Excluding discharge from the Charles River above Watertown Dam, total annual runoff to the lower Charles River was 1,240 million cubic feet; 39 percent was from the Stony Brook Subbasin, 27 percent was from the Muddy River, which includes runoff that drains to the Muddy River conduit, 7 percent was from the Laundry Brook Subbasin, and 4 percent was from the Faneuil Brook Subbasin. Flow from the ungaged areas composed about 23 percent of the total annual inflow to the lower Charles River, excluding discharge from the Charles River above Watertown Dam. Runoff to the lower Charles River was calculated for two design storms representing a 3-month and a 1-year event, 1.84 and 2.79 inches of total rainfall, respectively. These simulated discharges were provided to the Massachusetts Water Resources Authority for use in a receiving-water model of the lower Charles River. Total storm runoff to the lower Charles River was 111 and 257 million cubic feet for the 3-month and 1-year storms, respectively. Excluding discharge from the Charles River above Watertown Dam, total runoff to the lower Charles River was 30 and 53 million cubic feet for the 3-month and 1-year storms, respectively. Runoff from

  16. Kootenai River velocities, depth, and white sturgeon spawning site selection – A mystery unraveled?

    USGS Publications Warehouse

    Paragamian, V.L.; McDonald, R.; Nelson, G.J.; Barton, G.

    2009-01-01

    The Kootenai River white sturgeon Acipenser transmontanus population in Idaho, US and British Columbia (BC), Canada became recruitment limited shortly after Libby Dam became fully operational on the Kootenai River, Montana, USA in 1974. In the USA the species was listed under the Endangered Species Act in September of 1994. Kootenai River white sturgeon spawn within an 18-km reach in Idaho, river kilometer (rkm) 228.0–246.0. Each autumn and spring Kootenai River white sturgeon follow a ‘short two-step’ migration from the lower river and Kootenay Lake, BC, to staging reaches downstream of Bonners Ferry, Idaho. Initially, augmented spring flows for white sturgeon spawning were thought to be sufficient to recover the population. Spring discharge mitigation enhanced white sturgeon spawning but a series of research investigations determined that the white sturgeon were spawning over unsuitable incubation and rearing habitat (sand) and that survival of eggs and larvae was negligible. It was not known whether post-Libby Dam management had changed the habitat or if the white sturgeon were not returning to more suitable spawning substrates farther upstream. Fisheries and hydrology researchers made a team effort to determine if the spawning habitat had been changed by Libby Dam operations. Researchers modeled and compared velocities, sediment transport, and bathymetry with post-Libby Dam white sturgeon egg collection locations. Substrate coring studies confirmed cobbles and gravel substrates in most of the spawning locations but that they were buried under a meter or more of post-Libby Dam sediment. Analysis suggested that Kootenai River white sturgeon spawn in areas of highest available velocity and depths over a range of flows. Regardless of the discharge, the locations of accelerating velocities and maximum depth do not change and spawning locations remain consistent. Kootenai River white sturgeon are likely spawning in the same locations as pre-dam, but post-Libby Dam water management has reduced velocities and shear stress, thus sediment is now covering the cobbles and gravels. Although higher discharges will likely provide more suitable spawning and rearing conditions, this would be socially and politically unacceptable because it would bring the river elevation to or in excess of 537.66 m, which is flood stage. Thus, support should be given to habitat modifications incorporated into a management plan to restore suitable habitat and ensure better survival of eggs and larvae.

  17. Unraveling Structural Infrasound: understanding the science for persistent remote monitoring of critical infrastructure (Invited)

    NASA Astrophysics Data System (ADS)

    McKenna, S. M.; Diaz-Alvarez, H.; McComas, S.; Costley, D.; Whitlow, R. D.; Jordan, A. M.; Taylor, O.

    2013-12-01

    In 2006, the Engineer Research and Development Center (ERDC) began a program designed to meet the capability gap associated with remote assessment of critical infrastructure. This program addresses issues arising from the use of geophysical techniques to solve engineering problems through persistent monitoring of critical infrastructure using infrasound. In the original 2006-2009 study of a railroad bridge in Ft. Leonard Wood, MO, the fundamental modes of motion of the structure were detected at up to 30 km away, with atmospheric excitation deemed to be the source driver. Follow-on research focused on the mechanically driven modes excited by traffic, with directional acoustic emanations. The success of the Ft. Wood ambient excitation study resulted in several subsequent programs to push the boundaries of this new technique for standoff assessment, discussed herein. Detection of scour and river system health monitoring are serious problems for monitoring civil infrastructure, from both civilian and military perspectives. Knowledge of overall system behavior over time is crucial for assessment of bridge foundations and barge navigation. This research focuses on the same steel-truss bridge from the Ft. Wood study, and analyzes 3D and 2D substructure models coupled with the superstructure reaction loads to assess the modal deformations within the infrasound bandwidth and the correlation to scour of embedment material. The Urban infrasound program is infrasound modeling, data analysis, and sensor research leading to the detection, classification and localization of threat activities in complex propagation environments. Three seismo-acoustic arrays were deployed on rooftops across the Southern Methodist University campus in Dallas, Texas, to characterize the urban infrasound environment. Structural sources within 15 km of the arrays have been identified through signal processing and confirmed through acoustical models. Infrasound is also being studied as a means of structural impact assessment. The Interstate-20 Mississippi River Bridge in Vicksburg, MS is a 7 span, cantilever bridge. On March 23, 2011, a barge moving downstream struck a pier of the bridge. Infrasound stations located approximately 4.5 km away detected the impact. Coincidentally, ERDC had instrumented the bridge with strain gages and accelerometers as part of a structural health monitoring project. Finite Element (FE) models were developed to investigate the structural behavior of the bridge due to the impact, with experimental data and FE models validating source mechanism of the infrasound from the bridge. Health assessment of large dams, whether for flood control or power generation, is critical for both civilian and military applications. Ambient excitations can induce measurable responses in the dam, adjacent foundation and in the reservoir, some of which are in the infrasound passband. The Portugues Dam outside of Ponce, Puerto Rico, is being investigated. Currently in the final stages of construction, infrasound array data collections over all four seasons before and after the opening of the dam will provide a seasonally variable database, begun in July 2013. Impulsive excitation using an instrumented Cold Gas thruster (CGT) instrumented with a dynamic force sensor induces transient frequency responses in the dam, reservoir, and along the dam-foundation interface below 20 Hz, to allow for controlled source validation.

  18. Modeling Water Temperature in the Yakima River, Washington, from Roza Diversion Dam to Prosser Dam, 2005-06

    USGS Publications Warehouse

    Voss, Frank D.; Curran, Christopher A.; Mastin, Mark C.

    2008-01-01

    A mechanistic water-temperature model was constructed by the U.S. Geological Survey for use by the Bureau of Reclamation for studying the effect of potential water management decisions on water temperature in the Yakima River between Roza and Prosser, Washington. Flow and water temperature data for model input were obtained from the Bureau of Reclamation Hydromet database and from measurements collected by the U.S. Geological Survey during field trips in autumn 2005. Shading data for the model were collected by the U.S. Geological Survey in autumn 2006. The model was calibrated with data collected from April 1 through October 31, 2005, and tested with data collected from April 1 through October 31, 2006. Sensitivity analysis results showed that for the parameters tested, daily maximum water temperature was most sensitive to changes in air temperature and solar radiation. Root mean squared error for the five sites used for model calibration ranged from 1.3 to 1.9 degrees Celsius (?C) and mean error ranged from ?1.3 to 1.6?C. The root mean squared error for the five sites used for testing simulation ranged from 1.6 to 2.2?C and mean error ranged from 0.1 to 1.3?C. The accuracy of the stream temperatures estimated by the model is limited by four errors (model error, data error, parameter error, and user error).

  19. Possible options to slow down the advancement rate of Tarbela delta.

    PubMed

    Habib-Ur-Rehman; Rehman, Mirza Abdul; Naeem, Usman Ali; Hashmi, Hashim Nisar; Shakir, Abdul Sattar

    2017-12-22

    The pivot point of delta in Tarbela dam has reached at about 10.6 km from the dam face which may result in blocking of tunnels. Tarbela delta was modeled from 1979 to 2060 using hec-6 model. Initially, the model was calibrated for year 1999 and validated for years 2000, 2001, 2002, and 2006 by involving the data of sediment concentration, reservoir cross sections (73 range lines), elevation-area capacity curves, and inflows and outflows from the reservoir. Then, the model was used to generate future scenarios, i.e., run-1, run-2, and run-3 with pool levels; 428, 442, and 457 m, respectively, till 2060. Results of run-1 and run-2 showed advancement to choke the tunnels by 2010 and 2030, respectively. Finally, in run-3, the advancement was further delayed showing that tunnels 1 and 2 will be choked by year 2050 and pivot point will reach at 6.4 km from the dam face.

  20. Relation between selected water-quality variables and lake level in Upper Klamath and Agency Lakes, Oregon

    USGS Publications Warehouse

    Wood, Tamara M.; Fuhrer, Gregory J.; Morace, Jennifer L.

    1996-01-01

    Based on the analysis of data that they have been collecting for several years, the Klamath Tribes recently recommended that the Bureau of Reclamation (Reclamation) modify the operating plan for the dam to make the minimum lake levels for the June-August period more closely resemble pre-dam conditions (Jacob Kann, written commun., 1995). The U.S. Geological Survey (USGS) was asked to analyze the available data for the lake and to assess whether the evidence exists to conclude that year-to-year differences in certain lake water-quality variables are related to year-to-year differences in lake level. The results of the analysis will be used as scientific input in the process of developing an operating plan for the Link River Dam.

  1. Estimating time and spatial distribution of snow water equivalent in the Hakusan area

    NASA Astrophysics Data System (ADS)

    Tanaka, K.; Matsui, Y.; Touge, Y.

    2015-12-01

    In the Sousei program, on-going Japanese research program for risk information on climate change, assessing the impact of climate change on water resources is attempted using the integrated water resources model which consists of land surface model, irrigation model, river routing model, reservoir operation model, and crop growth model. Due to climate change, reduction of snowfall amount, reduction of snow cover and change in snowmelt timing, change in river discharge are of increasing concern. So, the evaluation of snow water amount is crucial for assessing the impact of climate change on water resources in Japan. To validate the snow simulation of the land surface model, time and spatial distribution of the snow water equivalent was estimated using the observed surface meteorological data and RAP (Radar Analysis Precipitation) data. Target area is Hakusan. Hakusan means 'white mountain' in Japanese. Water balance of the Tedori River Dam catchment was checked with daily inflow data. Analyzed runoff was generally well for the period from 2010 to 2012. From the result for 2010-2011 winter, maximum snow water equivalent in the headwater area of the Tedori River dam reached more than 2000mm in early April. On the other hand, due to the underestimation of RAP data, analyzed runoff was under estimated from 2006 to 2009. This underestimation is probably not from the lack of land surface model, but from the quality of input precipitation data. In the original RAP, only the rain gauge data of JMA (Japan Meteorological Agency) were used in the analysis. Recently, other rain gauge data of MLIT (Ministry of Land, Infrastructure, Transport and Tourism) and local government have been added in the analysis. So, the quality of the RAP data especially in the mountain region has been greatly improved. "Reanalysis" of the RAP precipitation is strongly recommended using all the available off-line rain gauges information. High quality precipitation data will contribute to validate hydrological model, satellite based precipitation product, GCM output, etc.

  2. The Effects of the Saluda Dam on the Surface-Water and Ground-Water Hydrology of the Congaree National Park Flood Plain, South Carolina

    USGS Publications Warehouse

    Conrads, Paul; Feaster, Toby D.; Harrelson, Larry G.

    2008-01-01

    The Congaree National Park was established '... to preserve and protect for the education, inspiration, and enjoyment of present and future generations an outstanding example of a near-virgin, southern hardwood forest situated in the Congaree River flood plain in Richland County, South Carolina' (Public Law 94-545). The resource managers at Congaree National Park are concerned about the timing, frequency, magnitude, and duration of flood-plain inundation of the Congaree River. The dynamics of the Congaree River directly affect ground-water levels in the flood plain, and the delivery of sediments and nutrients is constrained by the duration, extent, and frequency of flooding from the Congaree River. The Congaree River is the southern boundary of the Congaree National Park and is formed by the convergence of the Saluda and Broad Rivers 24 river miles upstream from the park. The streamflow of the Saluda River has been regulated since 1929 by the operation of the Saluda Dam at Lake Murray. The U.S. Geological Survey, in cooperation with the National Park Service, Congaree National Park, studied the interaction between surface water in the Congaree River and ground water in the flood plain to determine the effect Saluda Dam operations have on water levels in the Congaree National Park flood plain. Analysis of peak flows showed the reduction in peak flows after the construction of Lake Murray was more a result of climate variability and the absence of large floods after 1930 than the operation of the Lake Murray dam. Dam operations reduced the recurrence interval of the 2-year to 100-year peak flows by 6.1 to 17.6 percent, respectively. Analysis of the daily gage height of the Congaree River showed that the dam has had the effect of lowering high gage heights (95th percentile) in the first half of the year (December to May) and raising low gage heights (5th percentile) in the second half of the year (June to November). The dam has also had the effect of increasing the 1-, 3-, 7-, 30-, and 90-day minimum gage heights by as much as 23.9 percent and decreasing the 1-, 3-, 7-, 30-, and 90-day maximum gage heights by as much as 7.2 percent. Analysis of the ground-water elevations in the Congaree National Park flood plain shows similar results as the gage-height analysis--the dam has had the effect of lowering high ground-water elevations and increasing low ground-water elevations. Overall, the operation of the dam has had a greater effect on the gage heights within the river banks than gage heights in the flood plain. This result may have a greater effect on the subsurface water levels of the surficial flood-plain aquifer than the frequency and magnitude of inundation of the flood plain.

  3. Characterization of debris flows by rainstorm condition at a torrent on the Mount Yakedake volcano, Japan

    NASA Astrophysics Data System (ADS)

    Okano, Kazuyuki; Suwa, Hiroshi; Kanno, Tadahiro

    2012-01-01

    We analyzed rainstorm control on debris-flow magnitude and flow characteristics using the 14 sets of rainstorm and debris-flow data obtained from 1980 to 2005 at the Kamikamihorizawa Creek of Mount Yakedake. With the principal component analysis on five parameters of debris flows: frontal velocity, peak velocity, peak flow depth, peak discharge and total discharge, and with video-record of boulder-dams in motion, and the preceding rainfall intensities, we conclude that the 14 debris flows could be categorized into three groups. The flows in the first group have large hydraulic magnitude and massive and turbulent boulder-dams filled with slurry matrix. The flows in the second group have small hydraulic magnitude and boulder-dams scarcely filled with slurry matrix, and the dam is observed to alternate between stopping and starting. The flows in the third group have small hydraulic magnitude and boulder dams filled with slurry matrix. Analysis of hillslope hydrology and debris-flow data asserted that the antecedent rainfall conditions control not only the hydraulic magnitude of debris flows but also the boulder-dam features. Large rainstorms of high intensity and durations as short as 10 minutes induces fast and large storm runoff to the headwaters and the source reaches of debris flow, while rainstorms with durations as long as 24 h raises water content in the bottom deposits along the debris-flow growth reaches and generates substantial runoff from the tributaries. Classification of the three groups is done based on water availability to debris flows on the source and growth reaches at the occurrence of debris flow.

  4. 78 FR 43868 - Notice of Intent To Prepare a Draft Environmental Impact Statement for the Whittier Narrows Dam...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-22

    ... completed in 1957 as an integral component of the Los Angeles County Drainage Area system of dams and... several measures including: emergency management preparedness, remote monitoring, increased inspections... Scope of Analysis. The EIS will also evaluate the impacts of alternatives on environmental resources...

  5. Environmental impacts on the hydrology of ephemeral streams and alluvial aquifers

    NASA Astrophysics Data System (ADS)

    Kuells, C.; Marx, V.; Bittner, A.; Ellmies, R.; Seely, M.

    2009-04-01

    In arid and semi-arid regions alluvial groundwater resources of ephemeral streams are highly important for water supplies and ecosystems. Recent projects have studied processes of indirect recharge in situ and in detail (Dahan et al., 2008; Klaus et al., 2008). Still, little is known about the vulnerability of these aquifers to environmental impacts like surface dam constructions, land-use changes and climatic conditions as well as the time and type of response to such external impacts. With a catchment size of about 30.000 km² the Swakop River in Namibia is the largest of the country's twelve major ephemeral streams draining westwards into the Atlantic Ocean. The alluvial groundwater resources have been affected by the construction of two major surface water dams in the upper catchment as well as by abstractions for rural water supply, farming and mining downstream of the constructed dams (referred to as lower catchment). The determination of environmental impacts in the Swakop River catchment is difficult due to scarce hydrometric and water quality data. In order to obtain a better understanding of the hydrological system under changing environmental conditions a spatially distributed environmental tracer approach was applied. A longitudinal profile of groundwater samples was taken within a field study along the alluvial aquifer of the Swakop River. The samples were analysed for stable isotopes (18O, 2H), major ions and trace elements as well as for the residence time indicators CFC and SF6. The combined application of groundwater residence time analysis, stable isotope measurements and hydrochemical characterisation was used in order to associate a time scale with groundwater quality data. This method provides dated information on recharge and water quality before and after dam construction and can be used to detect environmental impacts on the hydrological system. CFC-12 analysis resulted in recharge years ranging from 1950 (0.01 pmol/l) to 1992 (1.4 pmol/l). Seven of 14 groundwater samples represent mainly groundwater recharged before or between the construction of surface water dams (1970 and 1978), the remaining samples represent groundwater recharge after dam construction. The groundwater residence time is generally short (recharge mainly after 1980) in the upper catchment and much higher (recharge mainly before 1980 and before dam construction) in the lower part of the catchment. Combining the age and isotope information shows how the surface water dams modified the pattern of groundwater recharge. The lower catchment has been partly cut off from the upper part in terms of indirect groundwater recharge by floods which means that most large floods originating in the headwaters of the Swakop River do not reach the lower alluvial aquifer anymore. The relationship between groundwater age and groundwater constituents helped to define baselines of hydrological properties (origin of water, recharge altitude) and of hydrochemical composition prior to the construction of dams (and other anthropogenic impacts). The well defined relationship between groundwater age and altitude of the river further helps to assess how fast different segments will be affected by these environmental impacts. References Dahan, O., Tatarsky, B., Enzel, Y., Kuells, C., Seely, M., Benito, G. (2008) Dynamics of Flood Water Infiltration and Ground Water Recharge in Hyperarid Desert. Ground Water, Vol. 46, 3. (6-2008), pp. 450-461. Klaus, J., Kuells, C., Dahan, O. (2008): Evaluating the recharge mechanism of the Lower Kuiseb Dune Area using mixing cell modeling and residence time data. Journal of Hydrology, v. 358, p. 304-316.

  6. Numerical Model Study of the Tuscarawas River below Dover Dam, Ohio

    DTIC Science & Technology

    2009-09-01

    chl.erdc.usace.army.mil/sms). Cross-sections from a ERDC/CHL TR-09-17 7 HEC - RAS model provided by the district, along with aerial photographs for proper alignment...ER D C/ CH L TR -0 9 -1 7 Numerical Model Study of the Tuscarawas River below Dover Dam, Ohio Richard L. Stockstill and Jane M. Vaughan...September 2009 C oa st al a n d H yd ra u lic s La b or at or y Approved for public release; distribution is unlimited. ERDC/CHL TR-09

  7. Characterization of a DNA Adenine Methyltransferase Gene of Borrelia hermsii and Its Dispensability for Murine Infection and Persistence.

    PubMed

    James, Allison E; Rogovskyy, Artem S; Crowley, Michael A; Bankhead, Troy

    2016-01-01

    DNA methyltransferases have been implicated in the regulation of virulence genes in a number of pathogens. Relapsing fever Borrelia species harbor a conserved, putative DNA methyltransferase gene on their chromosome, while no such ortholog can be found in the annotated genome of the Lyme disease agent, Borrelia burgdorferi. In the relapsing fever species Borrelia hermsii, the locus bh0463A encodes this putative DNA adenine methyltransferase (dam). To verify the function of the BH0463A protein product as a Dam, the gene was cloned into a Dam-deficient strain of Escherichia coli. Restriction fragment analysis subsequently demonstrated that complementation of this E. coli mutant with bh0463A restored adenine methylation, verifying bh0463A as a Dam. The requirement of bh0463A for B. hermsii viability, infectivity, and persistence was then investigated by genetically disrupting the gene. The dam- mutant was capable of infecting immunocompetent mice, and the mean level of spirochetemia in immunocompetent mice was not significantly different from wild type B. hermsii. Collectively, the data indicate that dam is dispensable for B. hermsii viability, infectivity, and persistence.

  8. Understanding Hydrological Regime Alterations Caused by dams: the Santiago River case in the Andean Region of the Amazon Basin.

    NASA Astrophysics Data System (ADS)

    Rosero-Lopez, D.; Flecker, A.; Walter, M. T.

    2016-12-01

    Water resources in South America have been clearly targeted as key sources for hydropower expansion over the next 30 years. Ecuador, among the most biologically diverse countries in the world, has the highest density of hydropower dams, either operational, under construction, or planned, in the Amazon Basin. Ecuador's ambitious plan to change its energy portfolio is conceived to satisfy the country's demand and to empower the country to be the region's first hydroelectric energy exporter. The Santiago watershed located in the southeast part of the country has 39 facilities either under construction or in operation. The Santiago River and its main tributaries (Zamora and Upano) are expected to be impounded by large dams over the next 10 years. In order to understand the magnitude and potential impacts of regional dam development on hydrological regimes, a 35-year historical data set of stream discharge was analyzed. We examined flow regimes for time series between the construction of each dam, starting with the oldest and largest built in 1982 up until the most recent dam built in 2005. Preliminary results indicate a systematic displacement in flow seasonality following post-dam compared to pre-dam conditions. There are also notable differences in the distributions of peaks and pulses in post-dam flows. The range of changes from these results shows that punctuated and cumulative impacts are related to the size of each new impoundment. These observations and their implications to the livelihoods, biota, and ecosystems services in the Santiago watershed need to be incorporated into a broader cost-benefit analysis of hydropower generation in the western Amazon Basin.

  9. [Effects of cascading hydropower dams operation on the structure and distribution pattern of benthic macroinvertebrate assemblages in Manwan Reservoir, Southwest China].

    PubMed

    Li, Jin Peng; Dong, Shi Kui; Peng, Ming Chun; Wu, Xuan; Zhou, Fang; Yu, Yin

    2017-12-01

    Benthic macroinvertebrate assemblages are one of the biological groups in aquatic ecosystem most sensitive to the habitat change and degradation, and can be a biological indicator for the aquatic ecosystem change and succession in cascading hydropower dam reservoir. The middle and lower reaches of the Lancang River are key spot for international biodiversity conservation and ecological studies on the effects of cascading hydropower dam exploitation. In this study, the reservoir of Manwan hydropower dam, the first dam in Lancang-Mekong river main stream, was selected as the study site. The benthic macroinvertebrate assemblages were sampled in 2011 and 2016 respectively. Meanwhile, the survey data before impounding (natural river, 1996) and early stage of single dam (1997) were collected to conduct the overall analysis for structure, distribution pattern and evolution of benthic macroinvertebrate assemblages. The results showed that the dominant biological group was gradually changed from the Oligochaeta and Insecta to the Mollusca. Along the longitudinal gradient, the density and biomass of the benthic macroinvertebrate assemblages were remarkably increased in reservoir, especially in the lacustrine zone. As for the functional feeding group, the predator and gatherer-collector changed into filter-collector predominantly in lacustrine zone. With the cascading dams operation, the biotic index indicated that the water quality of reservoir in 2016 was better than in 2011. The evolution of benthic macroinvertebrate assemblages in the Manwan Reservoir was related to the operation of Xiaowan dam in the upper reach, the hydrological regime and siltation in the reservoir, and would continue with dynamic changes with the operation of the cascading hydropower dam.

  10. Dietary folate, but not choline, modifies neural tube defect risk in Shmt1 knockout mice.

    PubMed

    Beaudin, Anna E; Abarinov, Elena V; Malysheva, Olga; Perry, Cheryll A; Caudill, Marie; Stover, Patrick J

    2012-01-01

    Low dietary choline intake has been proposed to increase the risk of neural tube defects (NTDs) in human populations. Mice with reduced Shmt1 expression exhibit a higher frequency of NTDs when placed on a folate- and choline-deficient diet and may represent a model of human NTDs. The individual contribution of dietary folate and choline deficiency to NTD incidence in this mouse model is not known. To dissociate the effects of dietary folate and choline deficiency on Shmt1-related NTD sensitivity, we determined NTD incidence in embryos from Shmt1-null dams fed diets deficient in either folate or choline. Shmt1(+/+) and Shmt1(-/-) dams were maintained on a standard AIN93G diet (Dyets), an AIN93G diet lacking folate (FD), or an AIN93G diet lacking choline (CD). Virgin Shmt1(+/+) and Shmt1(-/-) dams were crossed with Shmt1(+/-) males, and embryos were examined for the presence of NTDs at embryonic day (E) 11.5 or E12.5. Exencephaly was observed only in Shmt1(-/-) embryos isolated from dams maintained on the FD diet (P = 0.004). Approximately 33% of Shmt1(-/-)embryos (n = 18) isolated from dams maintained on the FD diet exhibited exencephaly. NTDs were not observed in any embryos isolated from dams maintained on the CD (n = 100) or control (n = 152) diets or in any Shmt1(+/+) (n = 78) or Shmt1(+/-) embryos (n = 182). Maternal folate deficiency alone is sufficient to induce NTDs in response to embryonic Shmt1 disruption.

  11. Predicting morphological changes DS New Naga-Hammadi Barrage for extreme Nile flood flows: A Monte Carlo analysis

    PubMed Central

    Sattar, Ahmed M.A.; Raslan, Yasser M.

    2013-01-01

    While construction of the Aswan High Dam (AHD) has stopped concurrent flooding events, River Nile is still subject to low intensity flood waves resulting from controlled release of water from the dam reservoir. Analysis of flow released from New Naga-Hammadi Barrage, which is located at 3460 km downstream AHD indicated an increase in magnitude of flood released from the barrage in the past 10 years. A 2D numerical mobile bed model is utilized to investigate the possible morphological changes in the downstream of Naga-Hammadi Barrage from possible higher flood releases. Monte Carlo simulation analyses (MCS) is applied to the deterministic results of the 2D model to account for and assess the uncertainty of sediment parameters and formulations in addition to sacristy of field measurements. Results showed that the predicted volume of erosion yielded the highest uncertainty and variation from deterministic run, while navigation velocity yielded the least uncertainty. Furthermore, the error budget method is used to rank various sediment parameters for their contribution in the total prediction uncertainty. It is found that the suspended sediment contributed to output uncertainty more than other sediment parameters followed by bed load with 10% less order of magnitude. PMID:25685476

  12. Predicting morphological changes DS New Naga-Hammadi Barrage for extreme Nile flood flows: A Monte Carlo analysis.

    PubMed

    Sattar, Ahmed M A; Raslan, Yasser M

    2014-01-01

    While construction of the Aswan High Dam (AHD) has stopped concurrent flooding events, River Nile is still subject to low intensity flood waves resulting from controlled release of water from the dam reservoir. Analysis of flow released from New Naga-Hammadi Barrage, which is located at 3460 km downstream AHD indicated an increase in magnitude of flood released from the barrage in the past 10 years. A 2D numerical mobile bed model is utilized to investigate the possible morphological changes in the downstream of Naga-Hammadi Barrage from possible higher flood releases. Monte Carlo simulation analyses (MCS) is applied to the deterministic results of the 2D model to account for and assess the uncertainty of sediment parameters and formulations in addition to sacristy of field measurements. Results showed that the predicted volume of erosion yielded the highest uncertainty and variation from deterministic run, while navigation velocity yielded the least uncertainty. Furthermore, the error budget method is used to rank various sediment parameters for their contribution in the total prediction uncertainty. It is found that the suspended sediment contributed to output uncertainty more than other sediment parameters followed by bed load with 10% less order of magnitude.

  13. Development and validation of a 2D dam break process model

    USDA-ARS?s Scientific Manuscript database

    Flooding due to dam or levee breach often results in detrimental impact on the people and their properties in the flooding zone. The embankment breach process is often caused by overtopping or internal erosion due to excessive water in a reservoir or a river. This study is to develop a practical nu...

  14. Simulation and control of sediment transport due to dam removal

    USDA-ARS?s Scientific Manuscript database

    This paper presents two case studies of post dam removal sedimentation in the United States. Two different one-dimensional channel evolution simulation models were used: CCHE1D and CONCEPTS, respectively. The first case is the application of CCHE1D to assess a long-term morphological response to the...

  15. Discussion of "Simple design criterion for residual energy on embankment dam stepped spillways" by Stefan Felder and Hubert Chanson

    USDA-ARS?s Scientific Manuscript database

    Researchers from the University of Queensland of New South Wales provided guidance to designers regarding the hydraulic performance of embankment dam stepped spillways. Their research compares a number of high-quality physical model data sets from multiple laboratories, emphasizing the variability ...

  16. Cloning, Characterization, Regulation, and Function of Dormancy-Associated MADS-Box Genes from Leafy Spurge

    USDA-ARS?s Scientific Manuscript database

    DORMANCY-ASSOCIATED MADS-BOX (DAM) genes are SHORT VEGETATIVE PHASE–Like MADS box transcription factors linked to endodormancy induction. We have cloned and characterized several cDNA and genomic clones of DAM genes from the model perennial weed leafy spurge (Euphorbia esula). We present evidence fo...

  17. Turbulence measurements over immobile gravel with additions of sand from supply limited to capacity transport conditions

    USDA-ARS?s Scientific Manuscript database

    Measurement of the turbulence that drives sand transport over and through immobile gravels is relevant to efforts to model sediment movement downstream of dams, where fine sediments are eroded from coarse substrates and are not replaced due to the presence of the upstream dam. The relative elevatio...

  18. Collaborative Learning the Wiki Way

    ERIC Educational Resources Information Center

    Engstrom, Mary E.; Jewett, Dusty

    2005-01-01

    In this article, the authors feature the model, Under Control: The Damming of the Missouri River, which was designed to engage middle school students in a real-world geographic issue: investigating the long term environmental, economic and cultural impacts of the 1944 Pick-Sloan Plan, which resulted in the construction of six dams on the Missouri…

  19. Crosstalk between virulence loci: regulation of Salmonella enterica pathogenicity island 1 (SPI-1) by products of the std fimbrial operon.

    PubMed

    López-Garrido, Javier; Casadesús, Josep

    2012-01-01

    Invasion of intestinal epithelial cells is a critical step in Salmonella infection and requires the expression of genes located in Salmonella pathogenicity island 1 (SPI-1). A key factor for SPI-1 expression is DNA adenine (Dam) methylation, which activates synthesis of the SPI-1 transcriptional activator HilD. Dam-dependent regulation of hilD is postranscriptional (and therefore indirect), indicating the involvement of unknown cell functions under Dam methylation control. A genetic screen has identified the std fimbrial operon as the missing link between Dam methylation and SPI-1. We show that all genes in the std operon are part of a single transcriptional unit, and describe three previously uncharacterized ORFs (renamed stdD, stdE, and stdF). We present evidence that two such loci (stdE and stdF) are involved in Dam-dependent control of Salmonella SPI-1: in a Dam(-) background, deletion of stdE or stdF suppresses SPI-1 repression; in a Dam(+) background, constitutive expression of StdE and/or StdF represses SPI-1. Repression of SPI-1 by products of std operon explains the invasion defect of Salmonella Dam(-) mutants, which constitutively express the std operon. Dam-dependent repression of std in the ileum may be required to permit invasion, as indicated by two observations: constitutive expression of StdE and StdF reduces invasion of epithelial cells in vitro (1,000 fold) and attenuates Salmonella virulence in the mouse model (>60 fold). In turn, crosstalk between std and SPI-1 may play a role in intestinal infections by preventing expression of SPI-1 in the caecum, an intestinal compartment in which the std operon is known to be expressed.

  20. Water temperature effects from simulated changes to dam operations and structures in the Middle and South Santiam Rivers, Oregon

    USGS Publications Warehouse

    Buccola, Norman L.

    2017-05-31

    Green Peter and Foster Dams on the Middle and South Santiam Rivers, Oregon, have altered the annual downstream water temperature profile (cycle). Operation of the dams has resulted in cooler summer releases and warmer autumn releases relative to pre-dam conditions, and that alteration can hinder recovery of various life stages of threatened spring-run Chinook salmon (Oncorhyncus tshawytscha) and winter steelhead (O. mykiss). Lake level management and the use of multiple outlets from varying depths at the dams can enable the maintenance of a temperature regime more closely resembling that in which the fish evolved by releasing warm surface water during summer and cooler, deeper water in the autumn. At Green Peter and Foster Dams, the outlet configuration is such that temperature control is often limited by hydropower production at the dams. Previously calibrated CE-QUAL-W2 water temperature models of Green Peter and Foster Lakes were used to simulate the downstream thermal effects from hypothetical structures and modified operations at the dams. Scenarios with no minimum power production requirements allowed some releases through shallower and deeper outlets (summer and autumn) to achieve better temperature control throughout the year and less year-to-year variability in autumn release temperatures. Scenarios including a hypothetical outlet floating 1 meter below the lake surface resulted in greater ability to release warm water during summer compared to existing structures. Later in Autumn (October 15–December 31), a limited amount of temperature control was realized downstream from Foster Dam by scenarios limited to operational changes with existing structures, resulting in 15-day averages within 1.0 degree Celsius of current operations.

  1. Probable hydrologic effects of a hypothetical failure of Mackay Dam on the Big Lost River Valley from Mackay, Idaho to the Idaho National Engineering Laboratory

    USGS Publications Warehouse

    Druffel, Leroy; Stiltner, Gloria J.; Keefer, Thomas N.

    1979-01-01

    Mackay Dam is an irrigation reservoir on the Big Lost River, Idaho, approximately 7.2 kilometers northwest of Mackay, Idaho. Consequences of possible rupture of the dam have long concerned the residents of the river valley. The presence of reactors and of a management complex for nuclear wastes on the reservation of the Idaho National Engineering Laboratory (INEL), near the river , give additional cause for concern over the consequences of a rupture of Mackay Dam. The objective of this report is to calculate and route the flood wave resulting from the hypothetical failure of Mackay Dam downstream to the INEL. Both a full and a 50 percent partial breach of this dam are investigated. Two techniques are used to develop the dam-break model. The method of characteristics is used to propagate the shock wave after the dam fails. The linear implicit finite-difference solution is used to route the flood wave after the shock wave has dissipated. The time of travel of the flood wave, duration of flooding, and magnitude of the flood are determined for eight selected sites from Mackay Dam, Idaho, through the INEL diversion. At 4.2 kilometers above the INEL diversion, peak discharges of 1,550.2 and 1,275 cubic meters per second and peak flood elevations of 1,550.3 and 1,550.2 meters were calculated for the full and partial breach, respectively. Flood discharges and flood peaks were not compared for the area downstream of the diversion because of the lack of detailed flood plain geometry. (Kosco-USGS)

  2. Geoelectrical Methods and Monitoring for Dam Safety Assessment, Republic of Korea

    NASA Astrophysics Data System (ADS)

    Lim, S. K.; Oldenburg, D.; Kang, S.; Song, S. H.

    2016-12-01

    Geoelectrical methods and monitoring to detect the seepage and internal erosion are essential for the safety assessment of earth dams. This work aims to develop improved methodologies to analyze the observed data and to monitor changes in seepage flow using direct current (DC) and self-potential (SP) methods. The seasonal variation of water level at dams causes a change in seepage and water saturation and hence alters the resistivity of the dam material. DC data are sensitive to water saturation and hence changes in saturation can be obtained by repeatedly measuring DC data. However, a more diagnostic parameter for safety assessment is fluid flow, and resistivity is only weakly coupled to that. Fortunately SP signals are directly related to fluid flow, and thus an SP survey has the potential to characterize fluid flow through the earth matrix. In Korea, the safety assessment of earth fill dams has been dealt by Korea Rural Community Corporation (KRC). Most of the dams are relatively old ( >50 years), hence assessing deterioration and corresponding seepage of those dams are crucial. In order to evaluate the engineering geological properties of the soil at earth dams in Korea, two boreholes in each dam were drilled to a bedrock depth that exceeds the height of the dam. A large set of field tests, including standard penetration tests (SPT) and in-situ permeability tests, were carried out along the boreholes. However, seepage paths in the dam is complex hence those limited measurements at a few points is not sufficient to delineate the zone of preferential seepage flow. For this, KRC developed permanent DC monitoring systems at a number of agricultural dams in Korea. The data were automatically collected every 6 hours. During the monitoring, the measurements of the water level at two boreholes were gathered at the same time. In this presentation we select an agricultural dam and delineate an anomalous leakage zone by inverting and interpreting time-lapse DC resistivity data acquired under conditions of variable water level. We use these results to simulate SP signals and investigate their potential in monitoring seepage. Our results lay the foundation for developing an automated analysis of DC and SP data to recognize normal and abnormal conditions and to provide an alert when variations beyond a specified threshold are detected.

  3. Effects of Outlets on Cracking Risk and Integral Stability of Super-High Arch Dams

    PubMed Central

    Hu, Hang

    2014-01-01

    In this paper, case study on outlet cracking is first conducted for the Goupitan and Xiaowan arch dams. A nonlinear FEM method is then implemented to study effects of the outlets on integral stability of the Xiluodu arch dam under two loading conditions, i.e., normal loading and overloading conditions. On the basis of the case study and the numerical modelling, the outlet cracking mechanism, risk, and corresponding reinforcement measures are discussed. Furthermore, the numerical simulation reveals that (1) under the normal loading conditions, the optimal distribution of the outlets will contribute to the tensile stress release in the local zone of the dam stream surface and decrease the outlet cracking risk during the operation period. (2) Under the overloading conditions, the cracks initiate around the outlets, then propagate along the horizontal direction, and finally coalesce with those in adjacent outlets, where the yield zone of the dam has a shape of butterfly. Throughout this study, a dam outlet cracking risk control and reinforcement principle is proposed to optimize the outlet design, select the appropriate concrete material, strengthen the temperature control during construction period, design reasonable impounding scheme, and repair the cracks according to their classification. PMID:25152907

  4. Analysis of Stream Channel Geometry Temporal and Spatial Evolution after Historic Dam Removal - two French case studies

    NASA Astrophysics Data System (ADS)

    Slawson, Deborah; Manière, Louis; Marchandeau, Florent

    2014-05-01

    IRSTEA, in partnership with the French Office national de l'eau et des milieux aquatiques (ONEMA), has begun a study of channel geomorphology in small streams where dams have been removed or breached between two and 200 years ago, without any subsequent restoration of the channel in the legacy sediments. A preliminary analysis of two sites in the Morvan, Burgundy, will be presented; a dam breached at the beginning of the 20th century and another in the last decade. Using ergodic reasoning, historical and recent upstream and downstream channel geometry is being used to predict the future temporal and spatial scales of channel physical habitat restoration. With the implementation of the European Water Framework Directive (WFD), dam removal has become a more frequently used method for restoring stream ecological continuity. In France, these obstacles are ubiquitous in medium and small streams and considerably reduce lateral and longitudinal connectivity. Improvement in the hydromorphologically controlled, physical habitat, particularly flow and sediment transport regimes, is often essential to improvement in stream biology. However, dam removal may cause long-term disturbances in flow and sediment transport regimes. In the absence of channel restoration measures in addition to dam removal, these disturbances may result in long-term negative impacts on fish, macroinvertebrate, and riparian plant physical habitat. These negative impacts may include channel incision and lowering of the water table, disconnection from floodplains, increased stream power and bed scouring, and increased sediment load from headcutting and bank erosion. Over time, these negative impacts may resolve themselves. However, the time frame necessary for reestablishing adequate physical habitat is not well-known. Some studies have indicated that many decades or longer may be required, depending on a variety of factors. Under the WFD, the REstoring rivers FOR effective catchment Management (REFORM) project is stressing the use of reference condition benchmarks when identifying objectives for and designing stream restoration projects. To identify appropriate reference condition benchmarks, it is important to understand over what temporal and spatial scales physical habitat improvement may take place after dam removal, including: 1. defining the spatial and temporal objectives for physical habitat restoration as a result of dam removal and 2. determining if dam removal alone will be sufficient to achieve those objectives or if additional channel restoration measures might be required.

  5. Seeking more Opportunities of Check Dams' harmony with nearby Circumstances via Design Thinking Process

    NASA Astrophysics Data System (ADS)

    Lin, Huan-Chun; Chen, Su-Chin; Tsai, Chen-Chen

    2014-05-01

    The contents of engineering design should indeed contain both science and art fields. However, the art aspect is too less discussed to cause an inharmonic impact with natural surroundings, and so are check dams. This study would like to seek more opportunities of check dams' harmony with nearby circumstances. According to literatures review of philosophy and cognition science fields, we suggest a thinking process of three phases to do check dams design work for reference. The first phase, conceptualization, is to list critical problems, such as the characteristics of erosion or deposition, and translate them into some goal situations. The second phase, transformation, is to use cognition methods such as analogy, association and metaphors to shape an image and prototypes. The third phase, formation, is to decide the details of the construction, such as stable safety analysis of shapes or materials. According to the previous descriptions, Taiwan's technological codes or papers about check dam design mostly emphasize the first and third phases, still quite a few lacks of the second phase. We emphases designers shouldn't ignore any phase of the framework especially the second one, or they may miss some chances to find more suitable solutions. Otherwise, this conceptual framework is simple to apply and we suppose it's a useful tool to design a more harmonic check dam with nearby natural landscape. Key Words: check dams, design thinking process, conceptualization, transformation, formation.

  6. An index-based framework for assessing patterns and trends in river fragmentation and flow regulation by global dams at multiple scales

    NASA Astrophysics Data System (ADS)

    Grill, Günther; Lehner, Bernhard; Lumsdon, Alexander E.; MacDonald, Graham K.; Zarfl, Christiane; Reidy Liermann, Catherine

    2015-01-01

    The global number of dam constructions has increased dramatically over the past six decades and is forecast to continue to rise, particularly in less industrialized regions. Identifying development pathways that can deliver the benefits of new infrastructure while also maintaining healthy and productive river systems is a great challenge that requires understanding the multifaceted impacts of dams at a range of scales. New approaches and advanced methodologies are needed to improve predictions of how future dam construction will affect biodiversity, ecosystem functioning, and fluvial geomorphology worldwide, helping to frame a global strategy to achieve sustainable dam development. Here, we respond to this need by applying a graph-based river routing model to simultaneously assess flow regulation and fragmentation by dams at multiple scales using data at high spatial resolution. We calculated the cumulative impact of a set of 6374 large existing dams and 3377 planned or proposed dams on river connectivity and river flow at basin and subbasin scales by fusing two novel indicators to create a holistic dam impact matrix for the period 1930-2030. Static network descriptors such as basin area or channel length are of limited use in hierarchically nested and dynamic river systems, so we developed the river fragmentation index and the river regulation index, which are based on river volume. These indicators are less sensitive to the effects of network configuration, offering increased comparability among studies with disparate hydrographies as well as across scales. Our results indicate that, on a global basis, 48% of river volume is moderately to severely impacted by either flow regulation, fragmentation, or both. Assuming completion of all dams planned and under construction in our future scenario, this number would nearly double to 93%, largely due to major dam construction in the Amazon Basin. We provide evidence for the importance of considering small to medium sized dams and for the need to include waterfalls to establish a baseline of natural fragmentation. Our versatile framework can serve as a component of river fragmentation and connectivity assessments; as a standardized, easily replicable monitoring framework at global and basin scales; and as part of regional dam planning and management strategies.

  7. Conflicting hydropower development and aquatic ecosystem conservation in Bhutan

    NASA Astrophysics Data System (ADS)

    Wi, S.; Yang, Y. C. E.

    2017-12-01

    Hydropower is one of the clean energy sources that many Himalayan countries are eager to develop to solve their domestic energy deficit issue such as India, Nepal and Pakistan. Like other Himalayan countries, Bhutan also has a great potential for hydropower development. However, Bhutan is one of few countries that has a domestic energy surplus and export its hydropower generation to neighboring countries (mainly to India). Exporting hydropower is one of the major economic sources in Bhutan. However, constructions of dams and reservoirs for hydropower development inevitably involve habitat fragmentation, causing a conflict of interest with the pursuit of value in aquatic ecosystem conservation. The objectives of this study is to 1) develop a distributed hydrologic model with snow and glacier module to simulate the hydrologic regimes of seven major watersheds in Bhutan; 2) apply the hydrologic model to compute hydropower generation for all existing and potential dams; 3) evaluate cascade impacts of each individual dam on downstream regions by employing three hydro-ecological indicators: the River Connectivity Index (RCI), Dendritic Connectivity Index (DCI), total affected river stretch (ARS), and 4) analyze the tradeoffs between hydropower generation and river connectivity at the national scale by means of a multiple objective genetic algorithm. Modeling results of three Pareto Fronts between ecological indicators and hydropower generation accompany with future energy export targets from the government can inform dam selections that maximizing hydropower generation while minimizing the impact on the aquatic ecosystem (Figure 1a). The impacts of climate change on these Pareto front are also explored to identify robust dam selection under changing temperature and precipitation (Figure 1b).

  8. Archaeological Investigations at Sites 45-OK-250 and 45-OK-4, Chief Joseph Dam Project, Washington.

    DTIC Science & Technology

    1984-01-01

    level behind Chief Joseph Dam. Systematic random sampling using I x I x ’ - 0.1-m collection units in 1 x 1, 1 x 2, or 2 x 2 m cel Is disclosed...ft to the operating pool . level behind Chief Joseph Dam. Systematic random sampling using 1 x 1 x 0.1-i collection units In 1 x 1, 1 x 2, or 2 x 2 m...contingencies under which data were collected , describe data collection and analysis, and organize and summarize data In a torm useful to the widest

  9. Assessment of the quality of water by hierarchical cluster and variance analyses of the Koudiat Medouar Watershed, East Algeria

    NASA Astrophysics Data System (ADS)

    Tiri, Ammar; Lahbari, Noureddine; Boudoukha, Abderrahmane

    2017-12-01

    The assessment of surface water in Koudiat Medouar watershed is very important especially when it comes to pollution of the dam waters by discharges of wastewater from neighboring towns in Oued Timgad, who poured into the basin of the dam, and agricultural lands located along the Oued Reboa. To this end, the multivariable method was used to evaluate the spatial and temporal variation of the water surface quality of the Koudiat Medouar dam, eastern Algeria. The stiff diagram has identified two main hydrochemical facies. The first facies Mg-HCO3 is reflected in the first sampling station (Oued Reboa) and in the second one (Oued Timgad), while the second facies Mg-SO4 is reflected in the third station (Basin Dam). The results obtained by the analysis of variance show that in the three stations all parameters are significant, except for Na, K and HCO3 in the first station (Oued Reboa) and the EC in the second station (Oued Timgad) and at the end NO3 and pH in the third station (Basin Dam). Q-mode hierarchical cluster analysis showed that two main groups in each sampling station. The chemistry of major ions (Mg, Ca, HCO3 and SO4) within the three stations results from anthropogenic impacts and water-rock interaction sources.

  10. Proliferation of Hydroelectric Dams in the Andean Amazon and Implications for Andes-Amazon Connectivity

    PubMed Central

    Finer, Matt; Jenkins, Clinton N.

    2012-01-01

    Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1) There is a critical need for further strategic regional and basin scale evaluation of dams. 2) There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3) Reconsideration of hydropower as a low-impact energy source in the Neotropics. PMID:22529979

  11. Proliferation of hydroelectric dams in the Andean Amazon and implications for Andes-Amazon connectivity.

    PubMed

    Finer, Matt; Jenkins, Clinton N

    2012-01-01

    Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1) There is a critical need for further strategic regional and basin scale evaluation of dams. 2) There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3) Reconsideration of hydropower as a low-impact energy source in the Neotropics.

  12. Run-of-River Impoundments Can Remain Unfilled While Transporting Gravel Bedload: Numerical Modeling Results

    NASA Astrophysics Data System (ADS)

    Pearson, A.; Pizzuto, J. E.

    2015-12-01

    Previous work at run-of-river (ROR) dams in northern Delaware has shown that bedload supplied to ROR impoundments can be transported over the dam when impoundments remain unfilled. Transport is facilitated by high levels of sand in the impoundment that lowers the critical shear stresses for particle entrainment, and an inversely sloping sediment ramp connecting the impoundment bed (where the water depth is typically equal to the dam height) with the top of the dam (Pearson and Pizzuto, in press). We demonstrate with one-dimensional bed material transport modeling that bed material can move through impoundments and that equilibrium transport (i.e., a balance between supply to and export from the impoundment, with a constant bed elevation) is possible even when the bed elevation is below the top of the dam. Based on our field work and previous HEC-RAS modeling, we assess bed material transport capacity at the base of the sediment ramp (and ignore detailed processes carrying sediment up and ramp and over the dam). The hydraulics at the base of the ramp are computed using a weir equation, providing estimates of water depth, velocity, and friction, based on the discharge and sediment grain size distribution of the impoundment. Bedload transport rates are computed using the Wilcock-Crowe equation, and changes in the impoundment's bed elevation are determined by sediment continuity. Our results indicate that impoundments pass the gravel supplied from upstream with deep pools when gravel supply rate is low, gravel grain sizes are relatively small, sand supply is high, and discharge is high. Conversely, impoundments will tend to fill their pools when gravel supply rate is high, gravel grain sizes are relatively large, sand supply is low, and discharge is low. The rate of bedload supplied to an impoundment is the primary control on how fast equilibrium transport is reached, with discharge having almost no influence on the timing of equilibrium.

  13. A Mouse Model of Transplacental Cocaine Exposure: Clinical Implications for Exposed Infants and Childrena.

    PubMed

    Kosofsky, Barry E; Wilkins, Aaron S

    1998-06-01

    To characterize the effects of cocaine on developing brain we have developed a mouse model of gestational cocaine exposure. We studied pregnant dams injected twice daily with cocaine HCl at 40, 20, or 10 mg/kg/day sc from embryonic days (E)8 to E17 (COC 40, COC20, and COC10, respectively), vehicle-injected dams allowed access to food ad libitum (SAL) or pair-fed with the COC 40 dams (SPF 40), animals pretreated with the short-acting α-adrenergic antagonist phentolamine prior to each cocaine injection (P COC 40), and animals administered phentolamine prior to saline (PHENT). COC 40, P COC 40, and SPF 40 dams demonstrated the lowest percentage weight gain during gestation. The surrogate-fostered offspring of COC 40, P COC 40, and SPF 40 dams demonstrated transient brain and body growth retardation on postnatal days (P)1 and P9 when compared to pups born to SAL dams. We conducted behavioral tests which allowed us to dissociate the indirect effect of cocaine-induced malnutrition from a direct effect of prenatal cocaine administration in altering postnatal behavior. Pups from all groups were tested for first-order Pavlovian conditioning on P9 or P12 or for the ability to ignore redundant information in a blocking paradigm on P50. Unlike the SPF 40, PHENT, and SAL controls, COC 40 and P COC 40 mice were unable to acquire an aversion to an odor previously paired with shock on P9, a learning deficit that resolved by P12. However, on P50, COC 40 mice and, to a lesser extent, P COC 40 and SPF 40 mice demonstrated a persistent behavioral deficit in our blocking paradigm, which may reflect alterations in selective attention. We discuss how these findings in our rodent model have developmental implications for human infants exposed to cocaine in utero.

  14. A mouse model of transplacental cocaine exposure. Clinical implications for exposed infants and children.

    PubMed

    Kosofsky, B E; Wilkins, A S

    1998-06-21

    To characterize the effects of cocaine on developing brain we have developed a mouse model of gestational cocaine exposure. We studied pregnant dams injected twice daily with cocaine HCl at 40, 20, or 10 mg/kg/day sc from embryonic days (E)8 to E17 (COC 40, COC20, and COC10, respectively), vehicle-injected dams allowed access to food ad libitum (SAL) or pair-fed with the COC 40 dams (SPF 40), animals pretreated with the short-acting alpha-adrenergic antagonist phentolamine prior to each cocaine injection (P COC 40), and animals administered phentolamine prior to saline (PHENT). COC 40, P COC 40, and SPF 40 dams demonstrated the lowest percentage weight gain during gestation. The surrogate-fostered offspring of COC 40, P COC 40, and SPF 40 dams demonstrated transient brain and body growth retardation on postnatal days (P)1 and P9 when compared to pups born to SAL dams. We conducted behavioral tests which allowed us to dissociate the indirect effect of cocaine-induced malnutrition from a direct effect of prenatal cocaine administration in altering postnatal behavior. Pups from all groups were tested for first-order Pavlovian conditioning on P9 or P12 or for the ability to ignore redundant information in a blocking paradigm on P50. Unlike the SPF 40, PHENT, and SAL controls, COC 40 and P COC 40 mice were unable to acquire an aversion to an odor previously paired with shock on P9, a learning deficit that resolved by P12. However, on P50, COC 40 mice and, to a lesser extent, P COC 40 and SPF 40 mice demonstrated a persistent behavioral deficit in our blocking paradigm, which may reflect alterations in selective attention. We discuss how these findings in our rodent model have developmental implications for human infants exposed to cocaine in utero.

  15. Peak discharge of a Pleistocene lava-dam outburst flood in Grand Canyon, Arizona, USA

    USGS Publications Warehouse

    Fenton, C.R.; Webb, R.H.; Cerling, T.E.

    2006-01-01

    The failure of a lava dam 165,000 yr ago produced the largest known flood on the Colorado River in Grand Canyon. The Hyaloclastite Dam was up to 366 m high, and geochemical evidence linked this structure to outburst-flood deposits that occurred for 32 km downstream. Using the Hyaloclastite outburst-flood deposits as paleostage indicators, we used dam-failure and unsteady flow modeling to estimate a peak discharge and flow hydrograph. Failure of the Hyaloclastite Dam released a maximum 11 ?? 109 m3 of water in 31 h. Peak discharges, estimated from uncertainty in channel geometry, dam height, and hydraulic characteristics, ranged from 2.3 to 5.3 ?? 105 m3 s-1 for the Hyaloclastite outburst flood. This discharge is an order of magnitude greater than the largest known discharge on the Colorado River (1.4 ?? 104 m3 s-1) and the largest peak discharge resulting from failure of a constructed dam in the USA (6.5 ?? 104 m3 s-1). Moreover, the Hyaloclastite outburst flood is the oldest documented Quaternary flood and one of the largest to have occurred in the continental USA. The peak discharge for this flood ranks in the top 30 floods (>105 m3 s-1) known worldwide and in the top ten largest floods in North America. ?? 2005 University of Washington. All rights reserved.

  16. Peak discharge of a Pleistocene lava-dam outburst flood in Grand Canyon, Arizona, USA

    NASA Astrophysics Data System (ADS)

    Fenton, Cassandra R.; Webb, Robert H.; Cerling, Thure E.

    2006-03-01

    The failure of a lava dam 165,000 yr ago produced the largest known flood on the Colorado River in Grand Canyon. The Hyaloclastite Dam was up to 366 m high, and geochemical evidence linked this structure to outburst-flood deposits that occurred for 32 km downstream. Using the Hyaloclastite outburst-flood deposits as paleostage indicators, we used dam-failure and unsteady flow modeling to estimate a peak discharge and flow hydrograph. Failure of the Hyaloclastite Dam released a maximum 11 × 10 9 m 3 of water in 31 h. Peak discharges, estimated from uncertainty in channel geometry, dam height, and hydraulic characteristics, ranged from 2.3 to 5.3 × 10 5 m 3 s -1 for the Hyaloclastite outburst flood. This discharge is an order of magnitude greater than the largest known discharge on the Colorado River (1.4 × 10 4 m 3 s -1) and the largest peak discharge resulting from failure of a constructed dam in the USA (6.5 × 10 4 m 3 s -1). Moreover, the Hyaloclastite outburst flood is the oldest documented Quaternary flood and one of the largest to have occurred in the continental USA. The peak discharge for this flood ranks in the top 30 floods (>10 5 m 3 s -1) known worldwide and in the top ten largest floods in North America.

  17. Modelling the Risk Posed by the Zebra Mussel Dreissena polymorpha: Italy as a Case Study

    NASA Astrophysics Data System (ADS)

    Bosso, Luciano; De Conno, Carmelina; Russo, Danilo

    2017-08-01

    We generated a risk map to forecast the potential effects of the spreading of zebra mussels Dreissena polymorpha across the Italian territory. We assessed the invader's potential impact on rivers, lakes, watersheds and dams at a fine-grained scale and detected those more at risk that should be targeted with appropriate monitoring. We developed a MaxEnt model and employed weighted overlay analyses to detect the species' potential distribution and generate risk maps for Italy. D. polymorpha has a greater probability of occurring at low to medium altitudes in areas characterised by fluviatile deposits of major streams. Northern and central Italy appear more at risk. Some hydroelectric power dams are at high risk, while most dams for irrigation, drinkable water reservoirs and other dam types are at medium to low risk. The lakes and rivers reaches (representing likely expansion pathways) at medium-high or high risk mostly occur in northern and central Italy. We highlight the importance of modelling potential invasions on a country scale to achieve the sufficient resolution needed to develop appropriate monitoring plans and prevent the invader's harmful effects. Further high-resolution risk maps are needed for other regions partly or not yet colonised by the zebra mussel.

  18. Assessing dam development, land use conversion, and climate change pressures on tributary river flows and water quality of the Mekong's Tonle Sap basin.

    NASA Astrophysics Data System (ADS)

    Cochrane, T. A.; Arias, M. E.; Oeurng, C.; Arnaiz, M.; Piman, T.

    2016-12-01

    The Tonle Sap Lake is Southeast Asia's most productive freshwater fishery, but the productivity of this valuable ecosystem is under threat from extensive development in the lower Mekong. With dams potentially blocking all major tributaries along the lower Mekong River, the role of local Tonle Sap basin tributaries for maintaining environmental flows, sediment loads, and fish recruitment is becoming increasingly critical. Development within the Tonle Sap basin, however, is not stagnant. Developers are proposing extensive dam development in key Tonle Sap tributaries (see Figure). Some dams will provide hydroelectricity and others will provide opportunities for large-scale irrigation resulting in agro-industrial expansion. There is thus an immediate need to assess the current situation and understand future effects of dam development and land use conversion under climate change on local riverine ecosystems. A combination of remote sensing, field visits, and hydro-meteorological data analyses enabled an assessment of water infrastructure and agricultural development in the basin. The application of SWAT for modelling flows and water quality combined with HEC-RESSIM for reservoir operations enabled for a holistic modelling approach. Initial results show that dams and land use change dominate flow and water quality responses, when compared to climate change. Large ongoing dam and irrigation development in the Pursat and Battambang subbasins will critically alter the natural river flows to the Tonle Sap Lake. Some of the observed dams did not have provisions for sediment flushing, clearing of flooded areas, fish passages, or other environmental protection measures. Poor planning and operation of this infrastructure could have dire consequences on the fragile riverine ecosystem of Tonle Sap tributaries, resulting in fish migration barriers, losses in aquatic habitats, and ecological degradation. The seemingly chaotic development in the Tonle Sap basin induces a great level of complexity in the prediction of future change in flows, sediment, and nutrients to the Tonle Sap, which needs to be overcome with improved data gathering through tools such as remote sensing. Timely interventions to the current development is needed in order to alleviate future environmental pressures.

  19. Hydrological threats to riparian wetlands of international importance - a global quantitative and qualitative analysis

    NASA Astrophysics Data System (ADS)

    Schneider, Christof; Flörke, Martina; De Stefano, Lucia; Petersen-Perlman, Jacob D.

    2017-06-01

    Riparian wetlands have been disappearing at an accelerating rate. Their ecological integrity as well as their vital ecosystem services for humankind depend on regular patterns of inundation and drying provided by natural flow regimes. However, river hydrology has been altered worldwide. Dams cause less variable flow regimes and water abstractions decrease the amount of flow so that ecologically important flood pulses are often reduced. Given growing population pressure and projected climate change, immediate action is required. However, the implementation of counteractive measures is often a complex task. This study develops a screening tool for assessing hydrological threats to riparian wetlands on global scales. The approach is exemplified on 93 Ramsar sites, many of which are located in transboundary basins. First, the WaterGAP3 hydrological modeling framework is used to quantitatively compare current and future modified flow regimes to reference flow conditions. In our simulations current water resource management seriously impairs riparian wetland inundation at 29 % of the analyzed sites. A further 8 % experience significantly reduced flood pulses. In the future, eastern Europe, western Asia, as well as central South America could be hotspots of further flow modifications due to climate change. Second, a qualitative analysis of the 93 sites determined potential impact on overbank flows resulting from planned or proposed dam construction projects. They take place in one-third of the upstream areas and are likely to impair especially wetlands located in South America, Asia, and the Balkan Peninsula. Third, based on the existing legal/institutional framework and water resource availability upstream, further qualitative analysis evaluated the capacity to preserve overbank flows given future streamflow changes due to dam construction and climate change. Results indicate hotspots of vulnerability exist, especially in northern Africa and the Persian Gulf.

  20. Modeling of Long-Term Fate of Mobilized Fines due to Dam-Embankment Interfacial Dislocations

    NASA Astrophysics Data System (ADS)

    Glascoe, L. G.; Ezzedine, S. M.; Kanarska, Y.; Lomov, I.; Antoun, T. H.

    2011-12-01

    Transverse cracks in embankment dams can develop as a result of post-construction settlements, earthquake deformations, or anthropogenic loads such as emplaced explosives. During these dislocations, fine particles are released from the damaged zones and can create unwanted inertial erosion and piping through the transverse cracks. These processes are equally critical to the overall stability of the dam. We present numerical results related to the problem of the fluid flow, transport, and filtration of particulates from damaged zones between the concrete sections of a gravity dam and the embankment wraparound sections. The model solves simultaneously the flow, attachment, and washout of fine particles within a wraparound heterogeneous porous media. We used a state-of-the-art finite element method with adaptive mesh refinement to capture 1) the interface between water dense with fines and clear water, and 2) the non-linearity of the free surface itself. A few scenarios of sediment entrapment in the filter layers of a gravity dam were considered. Several parameterizations of the filtration model and constitutive laws of soil behavior were also investigated. Through these analyses, we concluded that the attachment kinetic isotherm is the key function of the model. More parametric studies need to be conducted to assess the sensitivity of the kinetic isotherm parameters on the overall stability of the embankment. These kinetic parameters can be obtained, for example, through numerical micro- and meso-scale studies. It is worth mentioning that the current model, for the more realistic non-linear kinetic isotherms, has predicted a self-rehabilitation of the breached core with retention of 50% of the mobilized fines using a very conservative filtration length. A more realistic value should exceed the assumed one, resulting in a retention exceeding 50%. This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344 and funded by the U.S. Department of Homeland Security, Science and Technology Directorate.

  1. Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.

    This report presents survival, behavioral, and fish passage results for yearling and subyearling Chinook salmon smolts and juvenile steelhead tagged with JSATS acoustic micro-transmitters as part of a survival study conducted at John Day Dam during 2010. This study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a single-release survival estimate model.

  2. DNA adenine methyltransferase (Dam) controls the expression of the cytotoxic enterotoxin (act) gene of Aeromonas hydrophila via tRNA modifying enzyme-glucose-inhibited division protein (GidA).

    PubMed

    Erova, Tatiana E; Kosykh, Valeri G; Sha, Jian; Chopra, Ashok K

    2012-05-01

    Aeromonas hydrophila is both a human and animal pathogen, and the cytotoxic enterotoxin (Act) is a crucial virulence factor of this bacterium because of its associated hemolytic, cytotoxic, and enterotoxic activities. Previously, to define the role of some regulatory genes in modulating Act production, we showed that deletion of a glucose-inhibited division gene (gidA) encoding tRNA methylase reduced Act levels, while overproduction of DNA adenine methyltransferase (Dam) led to a concomitant increase in Act-associated biological activities of a diarrheal isolate SSU of A. hydrophila. Importantly, there are multiple GATC binding sites for Dam within an upstream sequence of the gidA gene and one such target site in the act gene upstream region. We showed the dam gene to be essential for the viability of A. hydrophila SSU, and, therefore, to better understand the interaction of the encoding genes, Dam and GidA, in act gene regulation, we constructed a gidA in-frame deletion mutant of Escherichia coli GM28 (dam(+)) and GM33 (∆dam) strains. We then tested the expressional activity of the act and gidA genes by using a promoterless pGlow-TOPO vector containing a reporter green fluorescent protein (GFP). Our data indicated that in GidA(+) strains of E. coli, constitutive methylation of the GATC site(s) by Dam negatively regulated act and gidA gene expression as measured by GFP production. However, in the ∆gidA strains, irrespective of the presence or absence of constitutively active Dam, we did not observe any alteration in the expression of the act gene signifying the role of GidA in positively regulating Act production. To determine the exact mechanism of how Dam and GidA influence Act, a real-time quantitative PCR (RT-qPCR) assay was performed. The analysis indicated an increase in gidA and act gene expression in the A. hydrophila Dam-overproducing strain, and these data matched with Act production in the E. coli GM28 strain. Thus, the extent of DNA methylation caused by constitutive versus overproduction of Dam, as well as possible conformation of DNA influence the expression of act and gidA genes in A. hydrophila SSU. Our results indicate that the act gene is under the control of both Dam and GidA modification methylases, and Dam regulates Act production via GidA. Copyright © 2012 Elsevier B.V. All rights reserved.

  3. Carbon redistribution by erosion processes in an intensively disturbed catchment

    NASA Astrophysics Data System (ADS)

    Boix-Fayos, Carolina; Martínez-Mena, María; Pérez Cutillas, Pedro; de Vente, Joris; Barberá, Gonzalo G.; Mosch, Wouter; Navarro Cano, Jose Antonio; Gaspar, Leticia; Navas, Ana

    2016-04-01

    Understanding how organic carbon moves with sediments along the fluvial system is crucial to close catchment scale carbon budgets. Especially challenging is the analysis of organic carbon dynamics during fluvial transport in heterogeneous, fragile and disturbed environments with ephemeral and intense hydrological pulses, typical of Mediterranean conditions. This paper explores the catchment scale organic carbon redistribution by lateral flows in extreme Mediterranean environmental conditions from a geomorphological perspective. The study area is a catchment (Cárcavo) in SE Spain with a semiarid climate, erodible lithologies, shallow soils, and highly disturbed by agricultural terraces, land levelling, reforestations and construction of check-dams. To increase understanding of erosion induced catchment scale organic carbon redistribution, we studied the subcatchments of 8 check-dams distributed along the catchment main channel in detail. We determined 137Cs, physicochemical characteristics and organic carbon pools of soils and sediments deposited behind each check-dam, performed spatial analysis of properties of the catchment and buffer areas around check-dams, and carried out geomorphological analysis of the slope-channel connections. Soils showed very low Total Organic Carbon (TOC) values oscillating between 15.2 and 4.4 g Kg-1 for forest and agricultural soils, respectively. Sediments mobilized by erosion were poor in TOC compared to the eroded (forest) soils (6.6±0.7 g Kg-1), and the redistribution of organic carbon through the catchment, especially of the Mineral Associated Organic Carbon (MAC) pool, showed the same pattern as clay particles and 137Cs. The TOC erosion rates (0.031±0.03 Mg ha-1 y-1) were comparable to others reported for subhumid Mediterranean catchments and to those modelled worldwide for pasture land. Those lateral fluxes were equivalent to 10.4 % of the TOC stock from the topsoil at the moment of the check-dam construction and reforestation works. However the organic carbon in deposited sediments comes not only from surface erosion processes, but also from deeper soil or sediment layers mobilized by concentrated erosion processes. Sediment richer in organic carbon comes from the soil surface of vegetated (reforested) areas close and well connected to the channels. Subcatchments dominated by laminar erosion processes showed two times higher TOC/total erosion ratio than subcatchments dominated by concentrated flow erosion processes. Lithology, soils and geomorphology exert a more important control on organic carbon redistribution than land use and vegetation cover in this geomorphologically very active catchment.

  4. Colorado River Basin Hover Dam - Review of Flood Control Regulation.

    DTIC Science & Technology

    1982-07-01

    plan would not adversely impact on any endangered species. 5. An archaeological analysis of the recommiended plan revealed that no cultural resources... Archaeological Resources. .. ...... ......... E-18 4. General Effect of High Flows on Fish and Wildlife Resources .. .... ...... ..... .......... E-19...E-29 5.5 Imperial Dam to the Southerly International Boundary. .. ...... ..... ...... .... E-33 5.6 Archaeological Resources

  5. 78 FR 38307 - Gresham Municipal Utilities; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-26

    .... Date filed: June 10, 2013. d. Applicant: Gresham Municipal Utilities. e. Name of Project: Upper Red Lake Dam Hydroelectric Project. f. Location: On Red River in Shawano County, Wisconsin. No federal... analysis at this time. n. The Upper Red Lake Dam Hydroelectric Project would consist of the following...

  6. Pequonnock River Basin, Bridgeport, Connecticut. Forest Lake Dam CT 00078. Phase I Inspection Report. National Dam Inspection Program.

    DTIC Science & Technology

    1978-08-01

    Legislation for the protection of wet lands has come too late for this watershed and the remaining small wet lands, if retained, have little value...Ridge Mountains of Central Virginia, 11.55" in Westminister , Maryland and 13" in Steuben County, Pennsylvania. HYDRAULIC ANALYSIS LAKE FOREST Due to

  7. Nutrient loads in the river mouth of the Río Verde basin in Jalisco, Mexico: how to prevent eutrophication in the future reservoir?

    PubMed

    Jayme-Torres, Gonzalo; Hansen, Anne M

    2017-10-04

    Since nutrients are emitted and mobilized in river basins, causing eutrophication of water bodies, it is important to reduce such emissions and subsequent nutrient loads. Due to processes of attenuation, nutrient loads are reduced during their mobilization in river basins. At the mouth of the Río Verde basin in western Mexico, the El Purgatorio dam is being constructed to supply water to the metropolitan area of the second most populated city in the country, Guadalajara. To analyze situations that allow protecting this future dam from eutrophication, nutrient loads in the mouth of the river basin were determined and their reduction scenarios evaluated by using the NEWS2 (Nutrient Export from Watersheds) model. For this, a nutrient emissions inventory was established and used to model nutrient loads, and modeling results were compared to an analysis of water quality data from two different monitoring sites located on the river. The results suggest that 96% of nitrogen and 99% of phosphorus emissions are attenuated in the watershed. Nutrient loads reaching the mouth of the river basin come mainly from wastewater discharges, followed by livestock activities and different land uses, and loads are higher as emissions are located closer to the mouth of the river basin. To achieve and maintain mesotrophic state of water in the future dam, different nutrient emission reduction scenarios were evaluated. According to these results, the reduction of 90% of the phosphorus loads in wastewater emissions or 75% of the phosphorus loads in wastewater emissions and at least 50% in emissions from livestock activities in the river basin are required.

  8. Effective mitigation of debris flows at Lemon Dam, La Plata County, Colorado

    NASA Astrophysics Data System (ADS)

    deWolfe, Victor G.; Santi, Paul M.; Ey, J.; Gartner, Joseph E.

    2008-04-01

    To reduce the hazards from debris flows in drainage basins burned by wildfire, erosion control measures such as construction of check dams, installation of log erosion barriers (LEBs), and spreading of straw mulch and seed are common practice. After the 2002 Missionary Ridge Fire in southwest Colorado, these measures were implemented at Knight Canyon above Lemon Dam to protect the intake structures of the dam from being filled with sediment. Hillslope erosion protection measures included LEBs at concentrations of 220-620/ha (200-600% of typical densities), straw mulch was hand spread at concentrations up to 5.6 metric tons/hectare (125% of typical densities), and seeds were hand spread at 67-84 kg/ha (150% of typical values). The mulch was carefully crimped into the soil to keep it in place. In addition, 13 check dams and 3 debris racks were installed in the main drainage channel of the basin. The technical literature shows that each mitigation method working alone, or improperly constructed or applied, was inconsistent in its ability to reduce erosion and sedimentation. At Lemon Dam, however, these methods were effective in virtually eliminating sedimentation into the reservoir, which can be attributed to a number of factors: the density of application of each mitigation method, the enhancement of methods working in concert, the quality of installation, and rehabilitation of mitigation features to extend their useful life. The check dams effectively trapped the sediment mobilized during rainstorms, and only a few cubic meters of debris traveled downchannel, where it was intercepted by debris racks. Using a debris volume-prediction model developed for use in burned basins in the Western U.S., recorded rainfall events following the Missionary Ridge Fire should have produced a debris flow of approximately 10,000 m 3 at Knight Canyon. The mitigation measures, therefore, reduced the debris volume by several orders of magnitude. For comparison, rainstorm-induced debris flows occurred in two adjacent canyons at volumes within the range predicted by the model.

  9. Use of Composite Fingerprinting Technique to Determine Contribution of Paria River Sediments to Dam-Release Flood Deposits in Marble Canyon, Grand Canyon, Az

    NASA Astrophysics Data System (ADS)

    Chapman, K.; Parnell, R. A.; Smith, M. E.; Grams, P. E.; Mueller, E. R.

    2015-12-01

    The 1963 closure of Glen Canyon Dam drastically reduced the downstream sediment supply and altered daily flow regimes of the Colorado River through Grand Canyon, resulting in significant sandbar erosion downstream of the dam. Dam-release floods, known as High Flow Experiments (HFEs), have occurred six times since 1996 and are intended to rebuild Grand Canyon sandbars using tributary-supplied sediment. In Marble Canyon (first 100 km of Grand Canyon) the targeted tributary is the Paria River which supplies approximately 90% of the annual suspended sediment flux through Marble Canyon; the same input contributed less than 6% prior to the dam. Annual topographic surveys have established that HFEs are effective at rebuilding sandbars. However, the long-term viability of using HFEs for sandbar maintenance is dependent on a sustainable source of sediments comprising HFE deposits. Significant use of non-tributary, main-stem sediments (i.e. pre-dam sand stored in eddies or the channel bed) in HFE deposits would indicate reliance on a limited resource, and diminishing returns in the ability of HFEs to rebuild sandbars. In this study, we sampled vertically throughout 12 bars in Marble Canyon to document temporal and downstream changes in the proportion of sediment sourced from the Paria River during the 2013 and 2014 HFEs. Preliminary data suggest that heavy mineral compositions and concentrations of Ti, S, Cr and Rb, all of which are influenced by grainsize, could be sufficiently capable of differentiating Paria-derived and main-stem sediments when combined into a composite fingerprint (CF). A multivariate mixing model using these CFs quantitatively determines the contribution of Paria-derived sediment in each HFE deposit sample. Mixing model endmembers for non-Paria sand include pre-dam flood deposits in Glen and Marble Canyons, and Marble Canyon dredge samples. These results elucidate the role of contemporary versus legacy sediment in long-term sandbar maintenance.

  10. Migration delays caused by anthropogenic barriers: modeling dams, temperature, and success on migrating salmon smolts

    USGS Publications Warehouse

    Marschall, Elizabeth A.; Mather, Martha E.; Parrish, Donna; Allison, Gary W.; McMenemy, James R.

    2011-01-01

    Disruption to migration is a growing problem for conservation and restoration of animal populations. Anthropogenic barriers along migration paths can delay or prolong migrations, which may result in a mismatch with migration-timing adaptations. To understand the interaction of dams (as barriers along a migration path), seasonally changing environmental conditions, timing of Atlantic salmon (Salmo salar) downstream migration, and ultimate migration success, we used 10 years of river temperature and discharge data as a template upon which we simulated downstream movement of salmon. Atlantic salmon is a cool-water species whose downstream migrating smolts must complete migration before river temperatures become too warm. We found that dams had a local effect on survival as well as a survival effect that was spatially and temporally removed from the encounter with the dam. While smolts are delayed by dams, temperatures downstream can reach lethal or near-lethal temperatures; as a result, the match between completion of migration and the window of appropriate migration conditions can be disrupted. The strength of this spatially and temporally removed effect is at least comparable to the local effects of dams in determining smolt migration success in the presence of dams. We also considered smolts from different tributaries, varying in distance from the river mouth, to assess the potential importance of locally adapted migration timing on the effect of barriers. Migration-initiation temperature affected modeled smolt survival differentially across tributaries, with the success of smolts from upstream tributaries being much more variable across years than that of smolts with a shorter distance to travel. As a whole, these results point to the importance of broadening our spatial and temporal view when managing migrating populations. We must consider not only how many individuals never make it across migration barriers, but also the spatially and temporally removed consequences of delays at the barriers for those individuals that successfully navigate them.

  11. Migration delays caused by anthropogenic barriers: Modeling dams, temperature, and success of migrating salmon smolts

    USGS Publications Warehouse

    Marschall, E.A.; Mather, M. E.; Parrish, D.L.; Allison, G.W.; McMenemy, J.R.

    2011-01-01

    Disruption to migration is a growing problem for conservation and restoration of animal populations. Anthropogenic barriers along migration paths can delay or prolong migrations, which may result in a mismatch with migration-timing adaptations. To understand the interaction of dams (as barriers along a migration path), seasonally changing environmental conditions, timing of Atlantic salmon (Salmo salar) downstream migration, and ultimate migration success, we used 10 years of river temperature and discharge data as a template upon which we simulated downstream movement of salmon. Atlantic salmon is a cool-water species whose downstream migrating smolts must complete migration before river temperatures become too warm. We found that dams had a local effect on survival as well as a survival effect that was spatially and temporally removed from the encounter with the dam. While smolts are delayed by dams, temperatures downstream can reach lethal or near-lethal temperatures;as a result, the match between completion of migration and the window of appropriate migration conditions can be disrupted. The strength of this spatially and temporally removed effect is at least comparable to the local effects of dams in determining smolt migration success in the presence of dams. We also considered smolts from different tributaries, varying in distance from the river mouth, to assess the potential importance of locally adapted migration timing on the effect of barriers. Migration-initiation temperature affected modeled smolt survival differentially across tributaries, with the success of smolts from upstream tributaries being much more variable across years than that of smolts with a shorter distance to travel. As a whole, these results point to the importance of broadening our spatial and temporal view when managing migrating populations. We must consider not only how many individuals never make it across migration barriers, but also the spatially and temporally removed consequences of delays at the barriers for those individuals that successfully navigate them. ??2011 by the Ecological Society of America.

  12. Effects of dam removal on Tule Fall Chinook salmon spawning habitat in the White Salmon River, Washington

    USGS Publications Warehouse

    Hatten, James R.; Batt, Thomas R.; Skalicky, Joseph J.; Engle, Rod; Barton, Gary J.; Fosness, Ryan L.; Warren, Joe

    2016-01-01

    Condit Dam is one of the largest hydroelectric dams ever removed in the USA. Breached in a single explosive event in October 2011, hundreds-of-thousands of cubic metres of sediment washed down the White Salmon River onto spawning grounds of a threatened species, Columbia River tule fall Chinook salmon Oncorhynchus tshawytscha. We investigated over a 3-year period (2010–2012) how dam breaching affected channel morphology, river hydraulics, sediment composition and tule fall Chinook salmon (hereafter ‘tule salmon’) spawning habitat in the lower 1.7 km of the White Salmon River (project area). As expected, dam breaching dramatically affected channel morphology and spawning habitat due to a large load of sediment released from Northwestern Lake. Forty-two per cent of the project area that was previously covered in water was converted into islands or new shoreline, while a large pool near the mouth filled with sediments and a delta formed at the mouth. A two-dimensional hydrodynamic model revealed that pool area decreased 68.7% in the project area, while glides and riffles increased 659% and 530%, respectively. A spatially explicit habitat model found the mean probability of spawning habitat increased 46.2% after dam breaching due to an increase in glides and riffles. Shifting channels and bank instability continue to negatively affect some spawning habitat as sediments continue to wash downstream from former Northwestern Lake, but 300 m of new spawning habitat (river kilometre 0.6 to 0.9) that formed immediately post-breach has persisted into 2015. Less than 10% of tule salmon have spawned upstream of the former dam site to date, but the run sizes appear healthy and stable. Published 2015. This article is a U.S. Government work and is in the public domain in the USA.

  13. Performance of soil particle-size distribution models for describing deposited soils adjacent to constructed dams in the China Loess Plateau

    NASA Astrophysics Data System (ADS)

    Zhao, Pei; Shao, Ming-an; Horton, Robert

    2011-02-01

    Soil particle-size distributions (PSD) have been used to estimate soil hydraulic properties. Various parametric PSD models have been proposed to describe the soil PSD from sparse experimental data. It is important to determine which PSD model best represents specific soils. Fourteen PSD models were examined in order to determine the best model for representing the deposited soils adjacent to dams in the China Loess Plateau; these were: Skaggs (S-1, S-2, and S-3), fractal (FR), Jaky (J), Lima and Silva (LS), Morgan (M), Gompertz (G), logarithm (L), exponential (E), log-exponential (LE), Weibull (W), van Genuchten type (VG) as well as Fredlund (F) models. Four-hundred and eighty samples were obtained from soils deposited in the Liudaogou catchment. The coefficient of determination (R 2), the Akaike's information criterion (AIC), and the modified AIC (mAIC) were used. Based upon R 2 and AIC, the three- and four-parameter models were both good at describing the PSDs of deposited soils, and the LE, FR, and E models were the poorest. However, the mAIC in conjunction with R 2 and AIC results indicated that the W model was optimum for describing PSD of the deposited soils for emphasizing the effect of parameter number. This analysis was also helpful for finding out which model is the best one. Our results are applicable to the China Loess Plateau.

  14. Classification of US hydropower dams by their modes of operation

    DOE PAGES

    McManamay, Ryan A.; Oigbokie, II, Clement O.; Kao, Shih -Chieh; ...

    2016-02-19

    A key challenge to understanding ecohydrologic responses to dam regulation is the absence of a universally transferable classification framework for how dams operate. In the present paper, we develop a classification system to organize the modes of operation (MOPs) for U.S. hydropower dams and powerplants. To determine the full diversity of MOPs, we mined federal documents, open-access data repositories, and internet sources. W then used CART classification trees to predict MOPs based on physical characteristics, regulation, and project generation. Finally, we evaluated how much variation MOPs explained in sub-daily discharge patterns for stream gages downstream of hydropower dams. After reviewingmore » information for 721 dams and 597 power plants, we developed a 2-tier hierarchical classification based on 1) the storage and control of flows to powerplants, and 2) the presence of a diversion around the natural stream bed. This resulted in nine tier-1 MOPs representing a continuum of operations from strictly peaking, to reregulating, to run-of-river, and two tier-2 MOPs, representing diversion and integral dam-powerhouse configurations. Although MOPs differed in physical characteristics and energy production, classification trees had low accuracies (<62%), which suggested accurate evaluations of MOPs may require individual attention. MOPs and dam storage explained 20% of the variation in downstream subdaily flow characteristics and showed consistent alterations in subdaily flow patterns from reference streams. Lastly, this standardized classification scheme is important for future research including estimating reservoir operations for large-scale hydrologic models and evaluating project economics, environmental impacts, and mitigation.« less

  15. Hydrological impact of high-density small dams in a humid catchment, Southeast China

    NASA Astrophysics Data System (ADS)

    Lu, W.; Lei, H.; Yang, D.

    2017-12-01

    The Jiulong River basin is a humid catchment with a drainage area of 14,741 km2; however, it has over 1000 hydropower stations within it. Such catchment with high-density small dams is scarce in China. Yet few is known about the impact of high-density small dams on streamflow changes. To what extent the large number of dams alters the hydrologic patterns is a fundamental scientific issue for water resources management, flood control, and aquatic ecological environment protection. Firstly, trend and change point analyses are applied to determine the characteristics of inter-annual streamflow. Based on the detected change point, the study period is divided into two study periods, the ``natural'' and ``disturbed'' periods. Then, a geomorphology-based hydrological model (GBHM) and the fixing-changing method are adopted to evaluate the relative contributions of climate variations and damming to the changes in streamflow at each temporal scale (i.e., from daily, monthly to annual). Based on the simulated natural streamflow, the impact of dam construction on hydrologic alteration and aquatic ecological environment will be evaluated. The hydrologic signatures that will be investigated include flood peak, seasonality of streamflow, and the inter-annual variability of streamflow. In particular, the impacts of damming on aquatic ecological environment will be investigated using eco-flow metrics and indicators of hydrologic alteration (IHA) which contains 33 individual streamflow statistics that are closely related to aquatic ecosystem. The results of this study expect to provide a reference for reservoir operation considering both ecological and economic benefits of such operations in the catchment with high-density dams.

  16. Classification of US hydropower dams by their modes of operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McManamay, Ryan A.; Oigbokie, II, Clement O.; Kao, Shih -Chieh

    A key challenge to understanding ecohydrologic responses to dam regulation is the absence of a universally transferable classification framework for how dams operate. In the present paper, we develop a classification system to organize the modes of operation (MOPs) for U.S. hydropower dams and powerplants. To determine the full diversity of MOPs, we mined federal documents, open-access data repositories, and internet sources. W then used CART classification trees to predict MOPs based on physical characteristics, regulation, and project generation. Finally, we evaluated how much variation MOPs explained in sub-daily discharge patterns for stream gages downstream of hydropower dams. After reviewingmore » information for 721 dams and 597 power plants, we developed a 2-tier hierarchical classification based on 1) the storage and control of flows to powerplants, and 2) the presence of a diversion around the natural stream bed. This resulted in nine tier-1 MOPs representing a continuum of operations from strictly peaking, to reregulating, to run-of-river, and two tier-2 MOPs, representing diversion and integral dam-powerhouse configurations. Although MOPs differed in physical characteristics and energy production, classification trees had low accuracies (<62%), which suggested accurate evaluations of MOPs may require individual attention. MOPs and dam storage explained 20% of the variation in downstream subdaily flow characteristics and showed consistent alterations in subdaily flow patterns from reference streams. Lastly, this standardized classification scheme is important for future research including estimating reservoir operations for large-scale hydrologic models and evaluating project economics, environmental impacts, and mitigation.« less

  17. Methods for predicting peak discharge of floods caused by failure of natural and constructed earthen dams

    USGS Publications Warehouse

    Walder, Joseph S.; O'Connor, Jim E.

    1997-01-01

    Floods from failures of natural and constructed dams constitute a widespread hazard to people and property. Expeditious means of assessing flood hazards are necessary, particularly in the case of natural dams, which may form suddenly and unexpectedly. We revise statistical relations (derived from data for past constructed and natural dam failures) between peak discharge (Qp) and water volume released (V0) or drop in lake level (d) but assert that such relations, even when cast into a dimensionless form, are of limited utility because they fail to portray the effect of breach-formation rate. We then analyze a simple, physically based model of dam-breach formation to show that the hydrograph at the breach depends primarily on a dimensionless parameter η=kV0/gl/2d7/2, where k is the mean erosion rate of the breach and g is acceleration due to gravity. The functional relationship between Qp and η takes asymptotically distinct forms depending on whether η ≪ 1 (relatively slow breach formation or small lake volume) or η ≫ 1 (relatively fast breach formation or large lake volume). Theoretical predictions agree well with data from dam failures for which k, and thus η, can be estimated. The theory thus provides a rapid means of predicting the plausible range of values of peak discharge at the breach in an earthen dam as long as the impounded water volume and the water depth at the dam face can be estimated.

  18. Sharing Perspectives and Learning from One Another: Southern Paiutes, Scientists, and Policymakers in the Glen Canyon Dam Adaptive Management Program

    NASA Astrophysics Data System (ADS)

    Austin, D. E.; Bulletts, K.; Bulletts, C.

    2017-12-01

    The traditional lands of the Southern Paiute people in the United States are bounded by more than 600 miles of the Colorado River from the Kaiparowits Plateau in the north to Blythe, California in the south. According to Southern Paiute traditional knowledge, Southern Paiutes were the first inhabitants of this region and are responsible for protecting and managing this land along with the water and all that is upon and within it. In 1963, the Bureau of Reclamation completed construction of Glen Canyon Dam on the Colorado River, and in 1972, the Glen Canyon National Recreation Area was established, encompassing Lake Mead above the Dam and a world class trout fishery on the Colorado River between the Dam and Lees Ferry. Below Lees Ferry on its way to Lake Mead and Hoover Dam, the Colorado River flows through Grand Canyon National Park and the Navajo and Hualapai reservations. U.S. federal law requires that Glen Canyon Dam be operated with minimal impact to the natural, recreational, and cultural resources of the region of the Colorado River that is potentially impacted by flows from the Dam. The Grand Canyon Protection Act and the Environmental Impact Statement (EIS) for the Operation of the Glen Canyon Dam established a program of long-term research and monitoring of the effects of the Dam on these resources. In 1991, three Southern Paiute tribes - the Kaibab Band of Paiute Indians, the Paiute Indian Tribe of Utah, and the San Juan Southern Paiute Tribe - agreed to participate in studies to identify cultural resources impacted by Glen Canyon Dam and to recommend strategies for their protection, In 1995, the EIS was completed and transition to the Adaptive Management Program (AMP) called for in the Grand Canyon Protection Act was begun. At that time, Southern Paiute activities expanded to include assessing potential environmental and cultural impacts of the dam, developing monitoring procedures, and interacting with scientists, other tribal representatives, and policymakers in the AMP. This presentation summarizes an analysis of two decades of Southern Paiute participation in the AMP, highlighting key interactions and learning experiences as well as ongoing challenges for Southern Paiute participants.

  19. Monitoring the ongoing deformation and seasonal behaviour affecting Mosul Dam through space-borne SAR data

    NASA Astrophysics Data System (ADS)

    Tessari, G.; Riccardi, P.; Pasquali, P.

    2017-12-01

    Monitoring of dam structural health is an important practice to control the structure itself and the water reservoir, to guarantee efficient operation and safety of surrounding areas. Ensuring the longevity of the structure requires the timely detection of any behaviour that could deteriorate the dam and potentially result in its shutdown or failure.The detection and monitoring of surface displacements is increasingly performed through the analysis of satellite Synthetic Aperture Radar (SAR) data, thanks to the non-invasiveness of their acquisition, the possibility to cover large areas in a short time and the new space missions equipped with high spatial resolution sensors. The availability of SAR satellite acquisitions from the early 1990s enables to reconstruct the historical evolution of dam behaviour, defining its key parameters, possibly from its construction to the present. Furthermore, the progress on SAR Interferometry (InSAR) techniques through the development of Differential InSAR (DInSAR) and Advanced stacking techniques (A-DInSAR) allows to obtain accurate velocity maps and displacement time-series.The importance of these techniques emerges when environmental or logistic conditions do not allow to monitor dams applying the traditional geodetic techniques. In such cases, A-DInSAR constitutes a reliable diagnostic tool of dam structural health to avoid any extraordinary failure that may lead to loss of lives.In this contest, an emblematic case will be analysed as test case: the Mosul Dam, the largest Iraqi dam, where monitoring and maintaining are impeded for political controversy, causing possible risks for the population security. In fact, it is considered one of the most dangerous dams in the world because of the erosion of the gypsum rock at the basement and the difficult interventions due to security problems. The dam consists of 113 m tall and 3.4 km long earth-fill embankment-type, with a clay core, and it was completed in 1984.The deformation fields obtained from SAR data are evaluated to assess the temporal evolution of the strains affecting the structure. Obtained results represent the preliminary stage of a multidisciplinary project, finalized to assess possible damages affecting a dam through remote sensing and civil engineering surveys.

  20. The Streambank Erosion Control Evaluation and Demonstration Act of 1974, Section 32, Public Law 93-251. Appendix A. Literature Survey.

    DTIC Science & Technology

    1981-12-01

    Creek, Russian River Basin, Sonoma County , California; Hydraulic Model Investigation," Technical Report H-73-3, U. S. Army Engineer Waterways Experiment...Springs Dam, Dry Creek, Russian River Basin, Sonoma County , Cali- fornia; Hydraulic Model Investigation," Technical Report H-73-3, U. S. Army Engineer...Structures Ables, J. H., Jr., and Pickering, G. A. 1973 (Feb). "Outlet Works, 0 Warm Springs Dam, Dry Creek, Russian River Basin, Sonoma County , Cali

Top