School Building Construction Through Private Funds in a Small School District.
ERIC Educational Resources Information Center
Brames, Fred
The private corporation leasing arrangement, as a source of school construction funds, is increasingly being used in Indiana; however, the principles are applicable in any state. The private corporation charges a project fee, which represents its maximum anticipated profit. The private corporation obtains the funds for the project; makes the…
Hospital renovation projects: phased construction requires planning at its best.
Cox, J C
1986-01-01
Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.
23 CFR 635.109 - Standardized changed condition clauses.
Code of Federal Regulations, 2010 CFR
2010-04-01
... anticipated, customary, or inherent to the construction industry) and the contractor believes that additional... OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.109 Standardized changed condition clauses... clauses shall be made part of, and incorporated in, each highway construction project approved under 23 U...
Evaluation of vibration limits and mitigation techniques for urban construction.
DOT National Transportation Integrated Search
2013-10-01
The overriding purpose of this research was to develop a comprehensive framework to address : vibration issues prior to and during construction, including calculation of anticipated ground : vibrations during project design, condition surveys of stru...
DOT National Transportation Integrated Search
1976-12-01
The seminar on "Construction Problems, Techniques and Solutions" held at the First Chicago Center in Chicago on October 20-22, 1975, was organized to focus on anticipated construction problems of the Chicago Central Area Transit Project to include un...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-03
... disasters. Amtrak anticipates constructing the proposed Project using Federal funding and, as the proposed...-2788; Phone (212) 275-6975. The EA is also available for review on the FRA Web site at http://www.fra... address future disasters in the NEC. Construction of the Project is proposed at this time because a real...
Maryland Health and Higher Educational Facilities Authority. 1996 Annual Report.
ERIC Educational Resources Information Center
Maryland State Health and Higher Educational Facilities Authority, Baltimore.
The Maryland Health and Higher Educational Facilities Authority performs various functions including: issuing bonds and bond anticipation notes; fixing rates and collecting user rents and fees; constructing, acquiring, and maintaining institutional projects; contracting for operation and maintenance of projects; establishing rules and regulations…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larson, Roy Edward; Walker, Grant W.
2002-12-31
Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.
7 CFR 3560.306 - Reserve account.
Code of Federal Regulations, 2010 CFR
2010-01-01
... be deemed to contain surplus funds when the balance at the end of the housing project's fiscal year...) As projects age, the required reserve account level may be adjusted to meet anticipated “life-cycle..., identity-of-interest, cost-reasonableness, and construction management apply to any work or services paid...
Defending A+: how to maintain a high credit rating during a facilities overhaul.
Ollie, Ed; Kolb-Collier, Deborah; Clay, Scott
2007-11-01
To defend its strong credit rating, New Hanover Regional Medical Center: Demonstrated a clear and cohesive vision. Improved short-term financial performance. Developed robust financial projections. Avoided reliance on a "build it and they will come" strategy. Managed construction cost risks. Minimized construction disruption. Anticipated financial market concerns and questions
1982-06-01
these conditions . Therefore, the no-action plan is not being recommended. With the present channel conditions and anticipated slow growth for... conditions very similar to those of today. No ocean disposal is anticipated. Because no significant growth in socioeconomic activity is expected without...accuracy; however, project construction provides conditions favorable for growth . The service industry would be expected to closely follow any increase
49 CFR 80.5 - Limitations on assistance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... extended construction periods and financing needs. The TIFIA's effectiveness in stimulating private... Significant Impact, or Record of Decision. (g) The Secretary shall fund a secured loan based on the project's financing needs. The credit agreement shall include the anticipated schedule for such loan disbursements...
Using Executive Information Systems to Manage Capital Projects and Facilities.
ERIC Educational Resources Information Center
Kaynor, Robert
1993-01-01
In higher education, facilities data are essential for long-term capital and financial planning and for testing assumptions underlying anticipated policy change. Executive information systems should incorporate life-cycle considerations (planning, construction, renovation, and management) and resource linkages (describing interrelationships of…
78 FR 64933 - Texas Eastern Transmission, LP; Notice of Application
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-30
... and necessity to construct its Emerald Longwall Mine Panel D1 Project. Texas Eastern states in its application that, due to anticipated longwall mining activities of Emerald Coal Resources, LP (Emerald) in Greene County, Pennsylvania in Panel D1 of Emerald's mine, ground subsidence may occur. In order to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-30
... removal will be integrated into the design, construction, and environmental planning for the Navy's... environmental review. While this project is designed to produce information necessary for the proposed EHW-2... achieving the levels of reduction that were anticipated, comparative measurements must be taken during the...
Convoy projects: a case study from Germany
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gruener, W.
The Convoy concept was formulated at a time when Kraftwerk Union (KWU) anticipated the start of five to six turnkey nuclear power plant projects within a very short time frame, related to as many customers, sites, and licensing authorities. To counteract the rapidly escalating costs and schedules of projects then under construction, a series of measures were enacted with the purpose of streamlining and optimizing the work procedures both within the company and in relation with the external partners - customers, licensing authorities and their technical advisors, suppliers, and subsuppliers. The organizational framework and the various tools deployed by themore » turnkey contractor ensured smooth and effective design and construction procedures. The adherence to the original budget and schedule is truly remarkable, encouraging further investigation into the applicability of such methods and procedures for future projects.« less
Xu, Lijun; Chen, Lulu; Li, Xiaolu; He, Tao
2014-10-01
In this paper, we propose a projective rectification method for infrared images obtained from the measurement of temperature distribution on an air-cooled condenser (ACC) surface by using projection profile features and cross-ratio invariability. In the research, the infrared (IR) images acquired by the four IR cameras utilized are distorted to different degrees. To rectify the distorted IR images, the sizes of the acquired images are first enlarged by means of bicubic interpolation. Then, uniformly distributed control points are extracted in the enlarged images by constructing quadrangles with detected vertical lines and detected or constructed horizontal lines. The corresponding control points in the anticipated undistorted IR images are extracted by using projection profile features and cross-ratio invariability. Finally, a third-order polynomial rectification model is established and the coefficients of the model are computed with the mapping relationship between the control points in the distorted and anticipated undistorted images. Experimental results obtained from an industrial ACC unit show that the proposed method performs much better than any previous method we have adopted. Furthermore, all rectified images are stitched together to obtain a complete image of the whole ACC surface with a much higher spatial resolution than that obtained by using a single camera, which is not only useful but also necessary for more accurate and comprehensive analysis of ACC performance and more reliable optimization of ACC operations.
Is Medicaid sustainable? Spending projections for the program's second forty years.
Kronick, Richard; Rousseau, David
2007-01-01
We constructed long-term projections of Medicaid spending and compared projected growth in spending with that of state and federal revenues. Notwithstanding the anticipated decline in employer-sponsored insurance and the long-term care needs of the baby boomers, we project that Medicaid spending as a share of national health spending will average 16.6 percent from 2006 to 2025--roughly unchanged from 16.5 percent in 2005--and then increase slowly to 19.0 percent by 2045. Growth in government revenues is projected to be large enough to sustain both Medicaid spending increases and substantial real growth in spending for other services.
Final Environmental Assessment for Aircraft Maintenance Operations Center
2014-06-01
short-term emissions during construction of new facilities, demolition of existing buildings, and removal of existing asphalt /concrete. There would...Repair: The existing asphalt road accessing Building 1934 would be repaired in June 2014. It is anticipated that this project would qualify for a CatEx...removal of existing asphalt /concrete. Minimal ambient air impacts from localized short-term emissions that would quickly dissipate away from the
Feng, Cun-Fang; Xu, Xin-Jian; Wang, Sheng-Jun; Wang, Ying-Hai
2008-06-01
We study projective-anticipating, projective, and projective-lag synchronization of time-delayed chaotic systems on random networks. We relax some limitations of previous work, where projective-anticipating and projective-lag synchronization can be achieved only on two coupled chaotic systems. In this paper, we realize projective-anticipating and projective-lag synchronization on complex dynamical networks composed of a large number of interconnected components. At the same time, although previous work studied projective synchronization on complex dynamical networks, the dynamics of the nodes are coupled partially linear chaotic systems. In this paper, the dynamics of the nodes of the complex networks are time-delayed chaotic systems without the limitation of the partial linearity. Based on the Lyapunov stability theory, we suggest a generic method to achieve the projective-anticipating, projective, and projective-lag synchronization of time-delayed chaotic systems on random dynamical networks, and we find both its existence and sufficient stability conditions. The validity of the proposed method is demonstrated and verified by examining specific examples using Ikeda and Mackey-Glass systems on Erdos-Renyi networks.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Paterson, L; Woollett, J
In January 2007, the Department of Energy (DOE) released the final Environmental Assessment for the Proposed Environmental Remediation at the Lawrence Livermore National Laboratory (LLNL) Site 300 Pit 7 Complex. At the same time, the Department of Toxic Substances Control (DTSC) released the final Negative Declaration and Initial Study covering the Pit 7 remediation. No substantial adverse effect on wildlife species of concern was anticipated from the project. However, it was proposed that wildlife surveys should be conducted prior to construction because species locations and breeding areas could potentially change by the time construction activities began. Although no known populationsmore » of rare or endangered/threatened plant species were known to occur within the project impact area at the time these documents were released, rare plants listed by the California Native Plant Society had been observed in the vicinity. As such, both DOE and DTSC proposed that plant surveys would be undertaken at the appropriate time of year to determine if rare plants would be impacted by project construction. This document provides the results of wildlife and rare plant surveys taken prior to the start of construction at the Pit 7 Complex.« less
George, William H.; Davis, Kelly Cue; Masters, N. Tatiana; Kajumulo, Kelly F.; Stappenbeck, Cynthia A.; Norris, Jeanette; Heiman, Julia R.; Staples, Jennifer M.
2015-01-01
Highly intoxicated versus sober women were evaluated using multi-group path analyses to test the hypothesis that sexual victimization history would interact with partner pressure to forgo condom use, resulting in greater condom-decision abdication – letting the man decide whether or not to use a condom. After beverage administration, community women (n=408) projected themselves into a scenario depicting a male partner exerting high or low pressure for unprotected sex. Mood, anticipated negative reactions from the partner, and condom-decision abdication were assessed. In both control and alcohol models, high pressure increased anticipated negative partner reaction, and positive mood was associated with increased abdication. In the alcohol model, victimization predicted abdication via anticipated negative partner reaction, and pressure decreased positive mood and abdication. In the control model, under high pressure, victimization history severity was positively associated with abdication. Findings implicate condom-decision abdication as an important construct in understanding how women’s sexual victimization histories may exert sustained impact on sexual interactions. PMID:26340952
In Brief: Carbon storage initiatives at energy department
NASA Astrophysics Data System (ADS)
Showstack, Randy
2009-06-01
The U.S. Department of Energy (DOE) recently announced several initiatives related to carbon capture. On 12 June, DOE secretary Steven Chu announced an agreement with the FutureGen Alliance that advances construction of the country's first commercial-scale, fully integrated carbon capture and sequestration project in Mattoon, Ill. After estimating costs and doing other assessments, DOE and the alliance will decide in 2010 whether to move forward or discontinue the project. “Developing this technology is critically important for reducing greenhouse gas emissions in the U.S. and around the world,” said Chu. The total anticipated financial contribution for the project is $1.1 billion from DOE and $400-600 million from the alliance.
Innovative resettlement schemes planned for the Numata Dam project
NASA Astrophysics Data System (ADS)
Nakayama, Mikiyasu
2003-10-01
The Numata Dam, planned for the Tone River basin of Gunma Prefecture, was the largest dam construction project ever considered in Japan. This dam construction project, however, did not materialize. The proposal for the Numata Dam was first launched in 1959, at a time when the Tokyo Metropolitan area was mushrooming, both in population and industrial activity. The Numata Dam was supposed to be a prioritized dam construction project to alleviate the then anticipated water shortage in the Tokyo Metropolitan area. The Numata Dam plan experienced fierce opposition from those who would have been obliged to resettle, whereas those in Tokyo and the surrounding metropolitan area welcomed the plan. The major concern of the planned Numata Dam was the number of resettlers, which was then estimated to be around 3000 families. The resettlement plan developed for the Numata Dam included some innovative concepts, which may be applicable even today, for dam construction projects in the developing world. The plan included such ideas as (a) having resettlers share existing farmland with the present owners provided improvements were made to increase productivity, (b) paying rent to resettlers, and (c) establishing the Tone River Development Agency. After more than a decade of debate, both at national and local levels, the Numata Dam project was finally discarded through a decision of the Prime Minister in 1972. The resettlement schemes elaborated for the Numata Dam still appear to be innovative. Such schemes may be applied to projects in the developing world, in particular, in nations that are about to take off with economic development. Copyright
Human-Powered Helicopter: A Program for Design and Construction
1991-06-01
that for the Gossamer Albatross , it was surprising that members of both teams felt that the most difficult obstacle was the travel and transportation of...the aircraft, crew and support equipment [Ref.4: p.120]. Both the Gossamer Albatross and the Daedalus projects were required to travel to Europe...to the degree anticipated. The Daedalus prototype, called the Light Eagle, was designed to break the Gossamer Albatross distance record of 21 miles
2015-06-01
sediment control plan during project implementation would be expected to minimize any adverse effects on resident fish species during construction. In... Effective August 8, 2007, under the authority of the Endangered Species Act of 1973, as amended, the U.S. Fish and Wildlife Service (Service) removed...of storm sewer pipe and 122 manholes of the airfield stormwater drainage network. Summary of Anticipated Environmental Effects Associated with the
Anticipated Work-Family Conflict: A Construct Investigation
ERIC Educational Resources Information Center
Westring, Alyssa Friede; Ryan, Ann Marie
2011-01-01
To date, little is known about how work-family issues impact the career development process. In the current paper, we explore this issue by investigating a relatively unstudied construct: anticipated work-family conflict. We found that this construct can be represented by the same six-dimensional factor structure used to assess concurrent…
The Neurobiology of Anhedonia and Other Reward-Related Deficits
Der-Avakian, Andre; Markou, Athina
2011-01-01
Anhedonia, or markedly diminished interest or pleasure, is a hallmark symptom of major depression, schizophrenia, and other neuropsychiatric disorders. Over the past three decades, the clinical definition of anhedonia has remained relatively unchanged, although cognitive psychology and behavioral neuroscience have expanded our understanding of other reward-related processes. Here, we review the neural bases of the construct of anhedonia that reflects deficits in hedonic capacity, and is also closely linked to the constructs of reward valuation, decision-making, anticipation, and motivation. The neural circuits subserving these reward-related processes include the ventral striatum, prefrontal cortical regions, and afferent and efferent projections. Understanding anhedonia and other reward-related constructs will facilitate diagnosis and treatment of disorders that include reward deficits as key symptoms. PMID:22177980
2005-06-01
impacts to storm water quality can range from minor to severe. For this project, impacts are anticipated to be moderate ifBMPs are adequately applied...monitored outfalls. High turbidity, suspended solids, and decreased cross section due to deposition may violate storm water quality benchmarks and...result in a Notice of Violation (NOV) for storm water quality permits. Besides erosive impacts, construction period activities can cause much more
ERIC Educational Resources Information Center
Cummins, John
2017-01-01
This paper is a description and analysis of the history of the renovation of Memorial Stadium and the building of the Barclay Simpson Student Athlete High Performance Center (SAHPC) on the Berkeley campus, showing how incremental changes over time result in a much riskier and financially less viable project than originally anticipated. It…
Anticipated Regret and Health Behavior: A Meta-Analysis
Brewer, Noel T.; DeFrank, Jessica T.; Gilkey, Melissa B.
2016-01-01
Objective Risk beliefs are central to most theories of health behavior, yet many unanswered questions remain about an increasingly studied risk construct, anticipated regret. We sought to better understand anticipated regret’s role in motivating health behaviors. Methods We systematically searched electronic databases for studies of anticipated regret and behavioral intentions or health behavior. We used random effects meta-analysis to synthesize effect sizes from 81 studies (n=45,618). Results Anticipated regret was associated with both intentions (r+= .50, p<.001) and health behavior (r+= .29, p<.001). Greater anticipated regret from engaging in a behavior (i.e., action regret) predicted weaker intentions and behavior, while greater anticipated regret from not engaging in a behavior (i.e., inaction regret) predicted stronger intentions and behavior. Anticipated action regret had smaller associations with behavioral intentions related to less severe and more distal hazards, but these moderation findings were not present for inaction regret. Anticipated regret generally was a stronger predictor of intentions and behavior than other anticipated negative emotions and risk appraisals. Conclusions Anticipated inaction regret has a stronger and more stable association with health behavior than previously thought. The field should give greater attention to understanding how anticipated regret differs from similar constructs, its role in health behavior theory, and its potential use in health behavior interventions. PMID:27607136
Anticipated regret and health behavior: A meta-analysis.
Brewer, Noel T; DeFrank, Jessica T; Gilkey, Melissa B
2016-11-01
Risk beliefs are central to most theories of health behavior, yet many unanswered questions remain about an increasingly studied risk construct, anticipated regret. The authors sought to better understand anticipated regret's role in motivating health behaviors. The authors systematically searched electronic databases for studies of anticipated regret and behavioral intentions or health behavior. They used random effects meta-analysis to synthesize effect sizes from 81 studies (n = 45,618). Anticipated regret was associated with both intentions (r+ = .50, p < .001) and health behavior (r+ = .29, p < .001). Greater anticipated regret from engaging in a behavior (i.e., action regret) predicted weaker intentions and behavior, whereas greater anticipated regret from not engaging in a behavior (i.e., inaction regret) predicted stronger intentions and behavior. Anticipated action regret had smaller associations with behavioral intentions related to less severe and more distal hazards, but these moderation findings were not present for inaction regret. Anticipated regret generally was a stronger predictor of intentions and behavior than other anticipated negative emotions and risk appraisals. Anticipated inaction regret has a stronger and more stable association with health behavior than previously thought. The field should give greater attention to understanding how anticipated regret differs from similar constructs, its role in health behavior theory, and its potential use in health behavior interventions. (PsycINFO Database Record (c) 2016 APA, all rights reserved).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1982-01-01
The WyCoal Project Village is a housing facility proposed adjacent to the Wyoming Coal Gasification Project plant construction site that would accommodate single workers in dormitory units and singles or couples at a recreation vehicle park. Centralized services and recreational facilities are also to be provided. The provision for some mobile home units to be used in lieu of RV spaces has been considered but would be developed only if a strong demonstrated demand from singles and couples required such a provision. No children will be allowed at the Project Village as accommodations for families will be available in themore » town of Douglas. The development program for the Project Village calls for a total plan capacity of 225 living units: 1500 dormitory rooms and 750 recreational vehicle spaces. However, the total units to be developed will not exceed 1800 with peak employment, including couples at the Recreational Vehicle Park, not anticipated to exceed 2000. The flexibility within the maximum plan capacity of 2250 will allow for the development of an appropriate balance of housing units geared to the on-site project demands as plant construction occurs. At this time a mix of approximately 1200 dormitory rooms and 600 RV spaces appears appropriate for planning purposes.« less
The Fundamental Neutron Physics Beamline at the Spallation Neutron Source.
Greene, Geoffrey; Cianciolo, Vince; Koehler, Paul; Allen, Richard; Snow, William Michael; Huffman, Paul; Gould, Chris; Bowman, David; Cooper, Martin; Doyle, John
2005-01-01
The Spallation Neutron Source (SNS), currently under construction at Oak Ridge National Laboratory with an anticipated start-up in early 2006, will provide the most intense pulsed beams of cold neutrons in the world. At a projected power of 1.4 MW, the time averaged fluxes and fluences of the SNS will approach those of high flux reactors. One of the flight paths on the cold, coupled moderator will be devoted to fundamental neutron physics. The fundamental neutron physics beamline is anticipated to include two beam-lines; a broad band cold beam, and a monochromatic beam of 0.89 nm neutrons for ultracold neutron (UCN) experiments. The fundamental neutron physics beamline will be operated as a user facility with experiment selection based on a peer reviewed proposal process. An initial program of five experiments in neutron decay, hadronic weak interaction and time reversal symmetry violation have been proposed.
Improvements in SMR Modular Construction through Supply Chain Optimization and Lessons Learned
DOE Office of Scientific and Technical Information (OSTI.GOV)
White III, Chelsea C.; Petrovic, Bojan
Affordable energy is a critical societal need. Capital construction cost is a significant portion of nuclear energy cost. By controlling and reducing cost, companies can build more competitive nuclear power plants and hence provide access to more affordable energy. Modular construction provides an opportunity to reduce the cost of construction, and as projects scale up in number, the cost of each unit can be further reduced. The objective of this project was to advance design and construction methods for manufacturing Small Modular Reactors (SMRs), and in particular to improve modular construction techniques and develop best practices for designing and operatingmore » supply chains that take advantage of these techniques. The overarching objectives were to accelerate the construction schedule and reduce its variability, reduce the cost of construction, reduce interest costs accrued during construction (IDC), and thus enhance the economic attractiveness of SMRs. Our fundamental measure of merit was total capital investment cost (TCIC). To achieve these objectives, this project developed a decision support system, EVAL, to support identifying, addressing, and resolving or ameliorating challenges and deficiencies in the current modular construction approach. The results of this effort were consistent with the facts that the cost of a construction activity is often smallest when accomplished in the factory, greatest when accomplished at the construction site, and at an intermediate level when accomplished at an assembly area close to the construction site. Further, EVAL can aid in providing insight into ways to reduce waste, improve quality, efficiency, and throughput and reflects the fact that the more done early in the construction process, i.e., in the factory, the more upfront funding is required and hence the more IDC will be accrued. The analysis has lead to a better understanding of circumstances under which modular construction performed mainly in the factory will result in lower expected total cost, relative to more traditional, on-site construction procedures. Further, we anticipate that EVAL can be used to gain insight regarding what role standardization can play in order for modularization to be most effectively defined. Such results would ultimately benefit all (small and large) new nuclear construction.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-15
... Transmission Line Project Environmental Impact Statement (EIS) (DOE/EIS-0463). In anticipation of additional... anticipation of this information, DOE is reopening the public scoping period for an indefinite period. DOE will...
Schlesinger, E R; Skoner, M M; Trooskin, E D; Markel, J R; North, A F
1976-04-01
A questionnaire survey of Title V special projects--Maternal and Infant Care (M&I), Comprehensive Care for Children and Youth (C&Y), Neonatal Intensive Care and Children's Dental Care--indicated that the anticipated change from federal project grants to state formula grants caused anxiety among project directors, low morale and high turnover in project staff, difficulty in filling staff positions, and anticipation of service reductions. These effects were much more prevalent and severe in projects which could realistically be expected to suffer budget cuts as a result of the shift in funding method. Despite the widespread anxiety, low morale and adverse effects reported by program directors, there was no reduction in the number of patients served, the scope of services offered, or the number of staff employed.
Recovery Act : Heterogeneous Feed Biorefinery Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schofield, Richard
2015-03-15
To overcome the hurdles associated with introducing a new technology, Enerkem applied to the US DOE for grant assistance with its Pontotoc, Mississippi, biorefinery under the DOE’s Demonstration of Integrated Biorefinery Operations FOA. Consistent with Enerkem’s strategic approach, the project proposed uses post sorted municipal solid waste blended with other forest residue. The proposed biorefinery is to be located within the boundaries of a working landfill, thus simplifying many aspects of environmental permitting while also reducing feedstock acquisition and transportation costs. An economic impact analysis was conducted using an adaptation of the US Department of Energy’s JEDI (Jobs and Economicmore » Development Impact) model for an ethanol-producing biorefinery. The JEDI model, which does not have a thermochemical processing option, had to be configured to reflect a biomass feedstock and was thus adapted by Enerkem to account for the unique feedstock requirements and operations of the Project. According to this model, development, construction, and 2 years of operation of the biorefinery require an investment of approximately $140 million. Also, a construction period of 18 months will create significant direct and indirect employment. Indirect employment includes steel manufacturers, construction materials manufacturers, material shipping, equipment manufacturers and fabrication, etc. During the construction phase of the Project, 210 total jobs are expected to be created, including 145 direct jobs and 72 indirect or induced jobs. During the operating period, 131 jobs would be created, 95 of which are direct. It is anticipated that the project will create at least 10 new jobs (included in the above figures and in addition to the JEDI data) in the sorting and recycling sector, since the project will require operations in sorting MSW since valuable ferrous, nonferrous and recyclable plastic materials will be sorted from MSW as part of the process that isolates MSW-derived biomass.« less
FULL SCALE BIOREACTOR LANDFILL FOR CARBON SEQUESTRATION AND GREENHOUSE EMISSION CONTROL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramin Yazdani; Jeff Kieffer; Heather Akau
2003-12-01
The Yolo County Department of Planning and Public Works is constructing a full-scale bioreactor landfill as a part of the Environmental Protection Agency's (EPA) Project XL program to develop innovative approaches for carbon sequestration and greenhouse emission control. The overall objective is to manage landfill solid waste for rapid waste decomposition and maximum landfill gas generation and capture for carbon sequestration and greenhouse emission control. Waste decomposition is accelerated by improving conditions for either the aerobic or anaerobic biological processes and involves circulating controlled quantities of liquid (leachate, groundwater, gray water, etc.), and, in the aerobic process, large volumes ofmore » air. The first phase of the project entails the construction of a 12-acre module that contains a 6-acre anaerobic cell, a 3.5-acre anaerobic cell, and a 2.5-acre aerobic cell at the Yolo County Central Landfill near Davis, California. The cells are highly instrumented to monitor bioreactor performance. Liquid addition has commenced in the 3.5-acre anaerobic cell and the 6-acre anaerobic cell. Construction of the 2.5-acre aerobic cell and biofilter has been completed. The remaining task to be completed is to test the biofilter prior to operation, which is currently anticipated to begin in January 2004. The current project status and preliminary monitoring results are summarized in this report.« less
Dendroclimatology of the Slave River Delta, Northwest Territories, Canada
NASA Astrophysics Data System (ADS)
Jarvis, S.; Buhay, W. M.; Blair, D.; Tardif, J.; Bailey, D.
2004-05-01
It is well documented that changing hydrological conditions impact delta ecosystems. Such changes can also affect local inhabitants who have historical connections to the area and its resources. During the summer of 2003 a multifaceted paleo-environmental project was initiated to reconstruct the frequencies of floods and droughts in the Slave River Delta (SRD), Northwest Territories, Canada. The project goal is to forecast future hydrological and ecological conditions in the SRD in light of anticipated climate change and increasing demand on water resources. With the intent of expanding the climate history of the SRD, this particular aspect of the project will employ white spruce tree-ring chronologies constructed from six sites visited within the delta. Work is currently in progress to build a master chronology estimated to span over 300 years. In addition, a climate model for the SRD is also being developed and will be highlighted.
Planning and managing future space facility projects. [management by objectives and group dynamics
NASA Technical Reports Server (NTRS)
Sieber, J. E.; Wilhelm, J. A.; Tanner, T. A.; Helmreich, R. L.; Burgenbauch, S. F.
1979-01-01
To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Galowitz, Stephen
The primary objective of the Project was to maximize the productive use of the substantial quantities of waste landfill gas generated and collected at the Central Landfill in Johnston, Rhode Island. An extensive analysis was conducted and it was determined that utilization of the waste gas for power generation in a combustion turbine combined cycle facility was the highest and best use. The resulting project reflected a cost effective balance of the following specific sub-objectives. 1) Meet environmental and regulatory requirements, particularly the compliance obligations imposed on the landfill to collect, process and destroy landfill gas. 2) Utilize proven andmore » reliable technology and equipment. 3) Maximize electrical efficiency. 4) Maximize electric generating capacity, consistent with the anticipated quantities of landfill gas generated and collected at the Central Landfill. 5) Maximize equipment uptime. 6) Minimize water consumption. 7) Minimize post-combustion emissions. To achieve the Project Objective the project consisted of several components. 1) The landfill gas collection system was modified and upgraded. 2) A State-of-the Art gas clean up and compression facility was constructed. 3) A high pressure pipeline was constructed to convey cleaned landfill gas from the clean-up and compression facility to the power plant. 4) A combined cycle electric generating facility was constructed consisting of combustion turbine generator sets, heat recovery steam generators and a steam turbine. 5) The voltage of the electricity produced was increased at a newly constructed transformer/substation and the electricity was delivered to the local transmission system. The Project produced a myriad of beneficial impacts. 1) The Project created 453 FTE construction and manufacturing jobs and 25 FTE permanent jobs associated with the operation and maintenance of the plant and equipment. 2) By combining state-of-the-art gas clean up systems with post combustion emissions control systems, the Project established new national standards for best available control technology (BACT). 3) The Project will annually produce 365,292 MWh's of clean energy. 4) By destroying the methane in the landfill gas, the Project will generate CO{sub 2} equivalent reductions of 164,938 tons annually. The completed facility produces 28.3 MWnet and operates 24 hours a day, seven days a week.« less
Planning for Preservation during Mass Digitization Projects
ERIC Educational Resources Information Center
Teper, Jennifer Hain; Shaw, Emily F.
2011-01-01
In anticipation of current and future mass digitization projects in which the University of Illinois at Urbana-Champaign's Library will participate, the Library's Conservation Unit began to gather data on the "scannability" of our general book collections to anticipate potential effects on conservation and preservation work flows. The…
Building a pipeline of talent for operating radio observatories
NASA Astrophysics Data System (ADS)
Wingate, Lory M.
2016-07-01
The National Radio Astronomy Observatory's (NRAO) National and International Non-Traditional Exchange (NINE) Program teaches concepts of project management and systems engineering in a focused, nine-week, continuous effort that includes a hands-on build project with the objective of constructing and verifying the performance of a student-level basic radio instrument. The combination of using a project management (PM)/systems engineering (SE) methodical approach based on internationally recognized standards in completing this build is to demonstrate clearly to the learner the positive net effects of following methodical approaches to achieving optimal results. It also exposes the learner to basic radio science theory. An additional simple research project is used to impress upon the learner both the methodical approach, and to provide a basic understanding of the functional area of interest to the learner. This program is designed to teach sustainable skills throughout the full spectrum of activities associated with constructing, operating and maintaining radio astronomy observatories. NINE Program learners thereby return to their host sites and implement the program in their own location as a NINE Hub. This requires forming a committed relationship (through a formal Letter of Agreement), establishing a site location, and developing a program that takes into consideration the needs of the community they represent. The anticipated outcome of this program is worldwide partnerships with fast growing radio astronomy communities designed to facilitate the exchange of staff and the mentoring of under-represented1 groups of learners, thereby developing a strong pipeline of global talent to construct, operate and maintain radio astronomy observatories.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pietryk, Steven
The primary purpose of the VOWTAP was to advance the offshore wind industry in the United States (U.S.) by demonstrating innovative technologies and process solutions that would establish offshore wind as a cost-effective renewable energy resource. The VOWTAP Team proposed to design, construct, and operate a 12 megawatt (MW) offshore wind facility located approximately 27 statute miles (mi) (24 nautical miles [nm], 43 kilometers [km]) off the coast of Virginia. The proposed Project would consist of two Alstom Haliade™ 150-6 MW turbines mounted on inward battered guide structures (IBGS), a 34.5-kilovolt (kV) alternating current (AC) submarine cable interconnecting the WTGsmore » (inter-array cable), a 34.5-kV AC submarine transmission cable (export cable), and a 34.5 kV underground cable (onshore interconnection cable) that would connect the Project with existing Dominion infrastructure located in Virginia Beach, Virginia (Figure 1). Interconnection with the existing Dominion infrastructure would also require an onshore switch cabinet, a fiber optic cable, and new interconnection station to be located entirely within the boundaries of the Camp Pendleton State Military Reservation (Camp Pendleton). The VOWTAP balanced technology innovation with commercial readiness such that turbine operations were anticipated to commence by 2018. Dominion, as the leaseholder of the Virginia Wind Energy Area (WEA), anticipated leveraging lessons learned through the VOWTAP, and applying them to future commercial-scale offshore wind development.« less
Potential of satellite-derived ecosystem functional attributes to anticipate species range shifts
NASA Astrophysics Data System (ADS)
Alcaraz-Segura, Domingo; Lomba, Angela; Sousa-Silva, Rita; Nieto-Lugilde, Diego; Alves, Paulo; Georges, Damien; Vicente, Joana R.; Honrado, João P.
2017-05-01
In a world facing rapid environmental changes, anticipating their impacts on biodiversity is of utmost relevance. Remotely-sensed Ecosystem Functional Attributes (EFAs) are promising predictors for Species Distribution Models (SDMs) by offering an early and integrative response of vegetation performance to environmental drivers. Species of high conservation concern would benefit the most from a better ability to anticipate changes in habitat suitability. Here we illustrate how yearly projections from SDMs based on EFAs could reveal short-term changes in potential habitat suitability, anticipating mid-term shifts predicted by climate-change-scenario models. We fitted two sets of SDMs for 41 plant species of conservation concern in the Iberian Peninsula: one calibrated with climate variables for baseline conditions and projected under two climate-change-scenarios (future conditions); and the other calibrated with EFAs for 2001 and projected annually from 2001 to 2013. Range shifts predicted by climate-based models for future conditions were compared to the 2001-2013 trends from EFAs-based models. Projections of EFAs-based models estimated changes (mostly contractions) in habitat suitability that anticipated, for the majority (up to 64%) of species, the mid-term shifts projected by traditional climate-change-scenario forecasting, and showed greater agreement with the business-as-usual scenario than with the sustainable-development one. This study shows how satellite-derived EFAs can be used as meaningful essential biodiversity variables in SDMs to provide early-warnings of range shifts and predictions of short-term fluctuations in suitable conditions for multiple species.
Linshiz, Gregory; Goldberg, Alex; Konry, Tania; Hillson, Nathan J
2012-01-01
Synthetic biology is a nascent field that emerged in earnest only around the turn of the millennium. It aims to engineer new biological systems and impart new biological functionality, often through genetic modifications. The design and construction of new biological systems is a complex, multistep process, requiring multidisciplinary collaborative efforts from "fusion" scientists who have formal training in computer science or engineering, as well as hands-on biological expertise. The public has high expectations for synthetic biology and eagerly anticipates the development of solutions to the major challenges facing humanity. This article discusses laboratory practices and the conduct of research in synthetic biology. It argues that the fusion science approach, which integrates biology with computer science and engineering best practices, including standardization, process optimization, computer-aided design and laboratory automation, miniaturization, and systematic management, will increase the predictability and reproducibility of experiments and lead to breakthroughs in the construction of new biological systems. The article also discusses several successful fusion projects, including the development of software tools for DNA construction design automation, recursive DNA construction, and the development of integrated microfluidics systems.
Using tailored methodical approaches to achieve optimal science outcomes
NASA Astrophysics Data System (ADS)
Wingate, Lory M.
2016-08-01
The science community is actively engaged in research, development, and construction of instrumentation projects that they anticipate will lead to new science discoveries. There appears to be very strong link between the quality of the activities used to complete these projects, and having a fully functioning science instrument that will facilitate these investigations.[2] The combination of using internationally recognized standards within the disciplines of project management (PM) and systems engineering (SE) has been demonstrated to lead to achievement of positive net effects and optimal project outcomes. Conversely, unstructured, poorly managed projects will lead to unpredictable, suboptimal project outcomes ultimately affecting the quality of the science that can be done with the new instruments. The proposed application of these two specific methodical approaches, implemented as a tailorable suite of processes, are presented in this paper. Project management (PM) is accepted worldwide as an effective methodology used to control project cost, schedule, and scope. Systems engineering (SE) is an accepted method that is used to ensure that the outcomes of a project match the intent of the stakeholders, or if they diverge, that the changes are understood, captured, and controlled. An appropriate application, or tailoring, of these disciplines can be the foundation upon which success in projects that support science can be optimized.
Philippine refiner completes diesel desulfurization project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Candido, S.S.; Crisostomo, E.V.
1997-01-27
In anticipation of tightening sulfur specifications on diesel fuel, Petron Corp. built a new 18,000 b/sd gas oil desulfurization unit (GODU) at its refinery in Bataan, Philippines. The GODU gives Petron sufficient diesel oil desulfurization capacity to meet demand for lower-sulfur diesel in the country. The project places the refinery in a pacesetter position to comply with the Philippine government`s moves to reduce air pollution, especially in urban centers, by reducing the sulfur specification for diesel to 0.5 wt% in 1996 from 0.7 wt% at the start of the project. Performance tests and initial operations of the unit have revealedmore » a desulfurization efficiency of 91% vs. a guaranteed efficiency of 90%. A feed sulfur content of 1.33 wt% is reduced to 0.12 wt% at normal operating conditions. Operating difficulties during start-up were minimized through use of a detailed prestartup check conducted during the early stages of construction work.« less
Major deepwater pipelay vessel starts work in North Sea
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heerema, E.P.
1998-05-04
Industry`s deepwater pipelaying capability has received a boost this year with the entry into the world`s fleet of Solitaire, a dynamically positioned pipelay vessel of about 350 m including stinger. The converted bulk carrier, formerly the Trentwood, will arrive on station in the North Sea and begin laying pipe this month on Statoil`s Europipe II project, a 600-km, 42-in. OD gas pipeline from Norway to Germany. Next year, the vessel will install pipe for the Exxon U.S.A.`s Gulf of Mexico South Diana development (East Breaks Block 945) in a water depth of 1,643 m and for Mobil Oil Canada asmore » part of the Sable Island Offshore and Energy Project offshore Nova Scotia. Using the S-lay mode, Solitaire is particularly well-suited for laying large lines economically, including the deepwater projects anticipated for the US Gulf of Mexico. Table 1 presents Solitaire`s technical specifications. The design, construction, pipelaying, and justification for building vessels such as the Solitaire are discussed.« less
Fuel Cell Balance-of-Plant Reliability Testbed Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sproat, Vern; LaHurd, Debbie
Reliability of the fuel cell system balance-of-plant (BoP) components is a critical factor that needs to be addressed prior to fuel cells becoming fully commercialized. Failure or performance degradation of BoP components has been identified as a life-limiting factor in fuel cell systems.1 The goal of this project is to develop a series of test beds that will test system components such as pumps, valves, sensors, fittings, etc., under operating conditions anticipated in real Polymer Electrolyte Membrane (PEM) fuel cell systems. Results will be made generally available to begin removing reliability as a roadblock to the growth of the PEMmore » fuel cell industry. Stark State College students participating in the project, in conjunction with their coursework, have been exposed to technical knowledge and training in the handling and maintenance of hydrogen, fuel cells and system components as well as component failure modes and mechanisms. Three test beds were constructed. Testing was completed on gas flow pumps, tubing, and pressure and temperature sensors and valves.« less
New Explorer-class AUV Ready for Deep-water, High-resolution Habitat Mapping Studies
NASA Astrophysics Data System (ADS)
Potts, T. A.; Shepard, A.
2006-12-01
In 2002, a partnership was formed to design, construct, field test, and operate an Autonomous Underwater Vehicle (AUV) equipped to provide high-resolution (<1 m) maps of offshore seafloor habitats down to 2200 meters depth. An ISE Explorer-class AUV was constructed and equipped to conduct seafloor characterization via multi-beam EM2000 providing both bathymetry and backscatter. Three 10-day cruises will be conducted between August and November 2006 to put the vehicle through its paces and refine operating protocols. It is anticipated that the vehicle will log over 200 hours of bottom time and acquire over 30 GB of data at proposed marine protected area sites off North and South Carolina, Gray's Reef National Marine Sanctuary off Georgia, and at the Oculina Habitat Area of Particular Concern off the east coast of Florida. The AUV will begin supporting competitively reviewed science projects starting in 2007.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-23
...) General Permit for Discharges from Construction Activities (2012 Construction General Permit). The EA... runoff from construction activities greater than one acre, where EPA is the permitting authority. Based... significant environmental impacts are anticipated from the issuance of the 2012 Construction General Permit...
Construction Trends Dictate Vital Skills.
ERIC Educational Resources Information Center
Polivchak, Philip
1989-01-01
Vocational education can provide opportunities for students by anticipating trends. Four trends in the construction industry are (1) remodeling, (2) building and apartment maintenance, (3) quality, and (4) smart houses. (JOW)
Development and psychometric evaluation of the Chronic Illness Anticipated Stigma Scale
Quinn, Diane M.; Kalichman, Seth C.; Park, Crystal L.
2015-01-01
The Chronic Illness Anticipated Stigma Scale (CIASS) was developed to measure anticipated stigma (i.e., expectations of prejudice, stereotyping, and discrimination) among people living with chronic illnesses. The CIASS is a 12-item scale with three subscales differentiating among sources of anticipated stigma, including friends and family members, work colleagues, and healthcare workers. Results support the reliability, validity, and generalizability of the CIASS in two samples of people living with chronic illnesses. The CIASS was correlated with other stigma-related constructs as well as indicators of mental health, physical health, and health behaviors. The CIASS can help researchers gauge the degree to which people living with chronic illnesses anticipate stigma, better understand the processes by which anticipated stigma contributes to the health and behavior of people living with chronic illnesses, and compare the extent to which people living with different types of chronic illnesses anticipate stigma. PMID:22526525
Great Plains Project: at worst a $1. 7 billion squeeze
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maize, K.
1983-04-11
On January 29, 1982, seeking a loan guarantee for its coal-to-gas synfuels project, Great Plains Gasification Associates told the Department of Energy that they expected to reap $1.2 billion in net income to the partnership during the first 10 years of the venture. On March 31, 1983, Great Plains treasurer Rodney Boulanger had a different projection: a horrific loss of $773 million in the first decade. The Great Plains project, with construction 50% complete, is being built near Beulah, ND. The project has a design capacity of 137.5 million cubic feet a day of SNG. Great Plains' analysis assumes thatmore » the plant will operate at 70% of design capacity in 1985, 77% in 1986, 84% in 1987 and 91% thereafter. The company projects the total project cost at $2.1 billion, consisting of plant costs of $1.9 billion and coal mine costs of $156 million. In originally projecting a cumulative net income of better than $1 billion, the partners anticipated running losses in only three of the first 10 years, and cash distributions from the project of $893 million during the first decade. Under the new projections, even in the best case, the first four years would show losses and there would be no distribution to the partners. In the worst case, the project would run in the red every year for the first 10 years.« less
NASA Technical Reports Server (NTRS)
Smith, J. L.
1978-01-01
An analysis is given of the Low-Cost Silicon Solar Array Project plans for the industrialization of new production technologies expected to be forthcoming as a result of the project's technology development efforts. In particular, LSSA's mandate to insure an annual production capability of 500 MW peak for the photovoltaic supply industry by 1986 is critically examined. The examination focuses on one of the concerns behind this goal -- timely development of industrial capacity to supply anticipated demand. Some of the conclusions include: (1) construction of small-scale pilot plants should be undertaken only for purposes of technology development; (2) large-scale demonstrations should be undertaken only when the technology is well in hand; (3) commercial-scale production should be left to the private sector; (4) the 500-MW annual output goal should be shifted to Program Headquarters.
NASA Technical Reports Server (NTRS)
1982-01-01
Electroprocessing which is concerned with fluid dynamics of the electroreduction process to determine how it may be modified to improve the quality of the deposit was studied. Experimental techniques are used in this research. These techniques include laser Schlieren photography, laser Doppler velocimetry, and frequency spectrum analysis. Projects involve fluid flow studies of zinc plating in aqueous and molten salt electrolytes, study of cell design for magnesium chlorides electrolysis, digital signal analysis of manganese electrodeposition in molten chlorides, and electroplating of molybdenum from low melting salts. It is anticipated that the use of refractory metals as constructed materials in engineering will increase. Their electrodeposition from molten salt electrolytes is important in the extraction metallurgy of refractory metals.
The Role of CMR and Others in Project Implementation using the CM Method to Support the Government
NASA Astrophysics Data System (ADS)
Tada, Hiroshi; Miyatake, Ichiro; Mouri, Junji; Endo, Kenji; Fueta, Toshiharu
In Japan, the construction management (CM) method has been introduced as a measure to support the governmental agencies, in developing and maintaining local infrastructures, or in executing public works projects in an appropriate manner, etc. The scope of work of the Construction Manager (CMR) of the CM method is specified as work items, in the special specification document for CM services contained in the contract documents, as a reflection of the client's expectations towards the performance of CMR. However, the CM services has been conducted as required on a case-by-case basis, because it is not possible to anticipate the actual construction status in advance, and thus the special specification document does not provide full detail of the scope of work of CMR. In such case, there may be a difference in the way the scope of work in the special specification document is recognized between the client and the CMR, which could make the CM method less effective. Moreover, there is a case in which the role sharing between the client and the CMR is not clearly defined, and both parties may engage in the same task in such case, causing an obstacle for smooth project implementation. For this reason, it is required to prepare the special specification document which clearly defines the scope of work of CMR, by examining the status of application of the CM method in actual project cases, and to improve the practices of the CM method as necessary. In view of this background, this study looks in to the actual project cases using the CM method, for the purpose of clarifying the actual scope of work of CMR for each task item defined in the special specification document, and the role sharing between the client and CMR, in the aim of contributing the promotion of the use and the effective application of the CM method.
Identifying, anticipating, and mitigating freight bottlenecks on Alabama interstates.
DOT National Transportation Integrated Search
2011-07-31
"This project established a framework for the creation and maintenance of a statewide strategy for identifying, : anticipating, and mitigating freight bottlenecks on interstate highways in the state of Alabama. It used : methodology developed by Camb...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elliott, Douglas C.; Olarte, Mariefel V.; Hart, Todd R.
2015-06-19
DOE-EE Bioenergy Technologies Office has set forth several goals to increase the use of bioenergy and bioproducts derived from renewable resources. One of these goals is to facilitate the implementation of the biorefinery. The biorefinery will include the production of liquid fuels, power and, in some cases, products. The integrated biorefinery should stand-alone from an economic perspective with fuels and power driving the economy of scale while the economics/profitability of the facility will be dependent on existing market conditions. UOP LLC proposed to demonstrate a fast pyrolysis based integrated biorefinery. Pacific Northwest National Laboratory (PNNL) has expertise in an importantmore » technology area of interest to UOP for use in their pyrolysis-based biorefinery. This CRADA project provides the supporting technology development and demonstration to allow incorporation of this technology into the biorefinery. PNNL developed catalytic hydrothermal gasification (CHG) for use with aqueous streams within the pyrolysis biorefinery. These aqueous streams included the aqueous phase separated from the fast pyrolysis bio-oil and the aqueous byproduct streams formed in the hydroprocessing of the bio-oil to finished products. The purpose of this project was to demonstrate a technically and economically viable technology for converting renewable biomass feedstocks to sustainable and fungible transportation fuels. To demonstrate the technology, UOP constructed and operated a pilot-scale biorefinery that processed one dry ton per day of biomass using fast pyrolysis. Specific objectives of the project were to: The anticipated outcomes of the project were a validated process technology, a range of validated feedstocks, product property and Life Cycle data, and technical and operating data upon which to base the design of a full-scale biorefinery. The anticipated long-term outcomes from successful commercialization of the technology were: (1) the replacement of a significant fraction of petroleum based fuels with advanced biofuels, leading to increased energy security and decreased carbon footprint; and (2) establishment of a new biofuel industry segment, leading to the creation of U.S. engineering, manufacturing, construction, operations and agricultural jobs. PNNL development of CHG progressed at two levels. Initial tests were made in the laboratory in both mini-scale and bench-scale continuous flow reactor systems. Following positive results, the next level of evaluation was in the scaled-up engineering development system, which was operated at PNNL.« less
Unpacking Assumptions in Research Synthesis: A Critical Construct Synthesis Approach
ERIC Educational Resources Information Center
Wolgemuth, Jennifer R.; Hicks, Tyler; Agosto, Vonzell
2017-01-01
Research syntheses in education, particularly meta-analyses and best-evidence syntheses, identify evidence-based practices by combining findings across studies whose constructs are similar enough to warrant comparison. Yet constructs come preloaded with social, historical, political, and cultural assumptions that anticipate how research problems…
The Soviet Military Leadership and the Question of Soviet Deployment Retreats
1988-11-01
change, within Project AIR FORCE’s National Security Strategies Program. Earlier studies published in this project include: Jeremy R. Azrael, The...of a weapon system inherited from thi past for the sake of anticipated tradeoffs, notably in disruptive effecfs on the Western alliance. Anticipation...extensively test what the market will bear in negotiation with the West. - The second largest Soviet conventional force deployments are in Siberia and the
Empirical Evidence for Niss' "Implemented Anticipation" in Mathematising Realistic Situations
ERIC Educational Resources Information Center
Stillman, Gloria; Brown, Jill P.
2012-01-01
Mathematisation of realistic situations is an on-going focus of research. Classroom data from a Year 9 class participating in a program of structured modelling of real situations was analysed for evidence of Niss's theoretical construct, implemented anticipation, during mathematisation. Evidence was found for two of three proposed aspects. In…
Evidence of "Implemented Anticipation" in Mathematising by Beginning Modellers
ERIC Educational Resources Information Center
Stillman, Gloria; Brown, Jill P.
2014-01-01
Data from open modelling sessions for year 10 and 11 students at an extracurricular modelling event and from a year 9 class participating in a programme of structured modelling of real situations were analysed for evidence of Niss's theoretical construct, "implemented anticipation," during mathematisation. Evidence was found for all…
Code of Federal Regulations, 2010 CFR
2010-04-01
... inventory, residential construction activity, and the current and anticipated supply/demand conditions... and anticipated supply/demand conditions in both the overall rental market and the assisted housing... involuntary displacement; and (2) The supply of vacant, comparable housing is sufficient to ensure that such...
[Earth and Space Sciences Project Services for NASA HPCC
NASA Technical Reports Server (NTRS)
Merkey, Phillip
2002-01-01
This grant supported the effort to characterize the problem domain of the Earth Science Technology Office's Computational Technologies Project, to engage the Beowulf Cluster Computing Community as well as the High Performance Computing Research Community so that we can predict the applicability of said technologies to the scientific community represented by the CT project and formulate long term strategies to provide the computational resources necessary to attain the anticipated scientific objectives of the CT project. Specifically, the goal of the evaluation effort is to use the information gathered over the course of the Round-3 investigations to quantify the trends in scientific expectations, the algorithmic requirements and capabilities of high-performance computers to satisfy this anticipated need.
[Earth Science Technology Office's Computational Technologies Project
NASA Technical Reports Server (NTRS)
Fischer, James (Technical Monitor); Merkey, Phillip
2005-01-01
This grant supported the effort to characterize the problem domain of the Earth Science Technology Office's Computational Technologies Project, to engage the Beowulf Cluster Computing Community as well as the High Performance Computing Research Community so that we can predict the applicability of said technologies to the scientific community represented by the CT project and formulate long term strategies to provide the computational resources necessary to attain the anticipated scientific objectives of the CT project. Specifically, the goal of the evaluation effort is to use the information gathered over the course of the Round-3 investigations to quantify the trends in scientific expectations, the algorithmic requirements and capabilities of high-performance computers to satisfy this anticipated need.
A brief history of long-life WSDOT concrete pavements.
DOT National Transportation Integrated Search
2010-02-01
The concrete pavements that were originally constructed in Washington State as part of the interstate construction program have performed remarkably well considering the dramatic increase in the anticipated traffic loads. To date, the primary distres...
Proceedings - Workshop on Materials Handling for Tunnel Construction
DOT National Transportation Integrated Search
1977-08-01
With the anticipated increases in tunnel construction in the next decade, greater demands will be made on transportation sytems to remove tunnel muck at rates consistent with tunnel excavation rates. This workshop discussed and noted that conventiona...
NASA Technical Reports Server (NTRS)
Zazzali, Christian
2003-01-01
Even experienced project managers can t anticipate every potential problem. Part of planning ahead should include allowing oneself the flexibility to rethink the plan and improvise if necessary. Unique solutions to problems sometimes create a set of new problems unique in nature as well. In dealing with sudden changes in planning, try to consider what other elements of the project will be affected, but don t second guess yourself into a state of inaction because you can t anticipate every contingency.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-01
... Statement for Land-Water Interface and Service Pier Extension, Naval Base Kitsap Bangor, Silverdale, WA and... Land-Water Interface (LWI) structures and (2) the proposed construction and operation of a Service Pier... waterfront. Construction is anticipated to take two years. Construction activities occurring in the water...
77 FR 58962 - Approval and Promulgation of Implementation Plans; Arizona; Nogales PM10
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-25
... attainment year motor vehicle emissions budget if revised to include road construction PM 10 , because, as... included road construction dust when submitted in its final form, would meet the requirements of CAA... our proposal, we anticipated the necessity for ADEQ to revise the MVEB to include road construction...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-26
... on claim construction (``ID'') issued by the presiding administrative law judge (``ALJ'') in the... anticipation or obviousness), unenforceability. Claim construction may be a necessary underpinning to the... or element. On its own, however, claim construction might not be viewed as constituting such an issue...
Roadway delineation practices handbook
DOT National Transportation Integrated Search
2012-01-01
Since 2007 the Eco-Logical grant program has funded 15 projects nationwide; twelve grant recipients completed their projects prior to 2012, two grant recipients completed their projects in the 2012 calendar year, and one anticipates finishing its pro...
NASA Astrophysics Data System (ADS)
Wingate, Lory Mitchell
2017-01-01
The National Radio Astronomy Observatory’s (NRAO) National and International Non-Traditional Exchange (NINE) Program teaches concepts of project management and systems engineering to chosen participants within a nine-week program held at NRAO in New Mexico. Participants are typically graduate level students or professionals. Participation in the NINE Program is through a competitive process. The program includes a hands-on service project designed to increase the participants knowledge of radio astronomy. The approach demonstrate clearly to the learner the positive net effects of following methodical approaches to achieving optimal science results.The NINE teaches participants important sustainable skills associated with constructing, operating and maintaining radio astronomy observatories. NINE Program learners are expected to return to their host sites and implement the program in their own location as a NINE Hub. This requires forming a committed relationship (through a formal Letter of Agreement), establishing a site location, and developing a program that takes into consideration the needs of the community they represent. The anticipated outcome of this program is worldwide partnerships with fast growing radio astronomy communities designed to facilitate the exchange of staff and the mentoring of under-represented groups of learners, thereby developing a strong pipeline of global talent to construct, operate and maintain radio astronomy observatories.
The Palm Desert renewable [hydrogen] transportation system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chamberlin, C.E.; Lehman, P.
1998-08-01
This paper describes the Schatz Energy Research Center (SERC) progress on the Palm Desert Renewable Hydrogen Transportation System Project for the period June 1997 through May 1998. The project began in March 1996. The goal of the Palm Desert Project is to develop a clean and sustainable transportation system for a community. The project demonstrates the practical utility of hydrogen as a transportation fuel and the proton exchange membrane (PEM) fuel cell as a vehicle power system. The project includes designing and building 4 fuel cell powered vehicles, a solar hydrogen generating and refueling station, and a fuel cell vehiclemore » diagnostic center. Over this last year, SERC has built a fuel cell powered neighborhood electric vehicle and delivered it to the City of Palm Desert. The design of the hydrogen refueling station is near completion and it is anticipated that construction will be complete in the fall of 1998. The vehicles are currently being refueled at a temporary refueling station. The diagnostic center is being designed and maintenance procedures as well as computer diagnostic programs for the fuel cell vehicles are being developed. City employees are driving the vehicles daily and monitoring data are being collected. The drivers are pleased with the performance of the vehicles.« less
NASA Astrophysics Data System (ADS)
Mortuza, M. R.; Demissie, Y. K.
2015-12-01
In lieu with the recent and anticipated more server and frequently droughts incidences in Yakima River Basin (YRB), a reliable and comprehensive drought assessment is deemed necessary to avoid major crop production loss and better manage the water right issues in the region during low precipitation and/or snow accumulation years. In this study, we have conducted frequency analysis of hydrological droughts and quantified associated uncertainty in the YRB under both historical and changing climate. Streamflow drought index (SDI) was employed to identify mutually correlated drought characteristics (e.g., severity, duration and peak). The historical and future characteristics of drought were estimated by applying tri-variate copulas probability distribution, which effectively describe the joint distribution and dependence of drought severity, duration, and peak. The associated prediction uncertainty, related to parameters of the joint probability and climate projections, were evaluated using the Bayesian approach with bootstrap resampling. For the climate change scenarios, two future representative pathways (RCP4.5 and RCP8.5) from University of Idaho's Multivariate Adaptive Constructed Analogs (MACA) database were considered. The results from the study are expected to provide useful information towards drought risk management in YRB under anticipated climate changes.
23 CFR 630.1010 - Significant projects.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Significant projects. 630.1010 Section 630.1010 Highways... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1010 Significant projects. (a) A significant project is one that, alone or in combination with other concurrent projects nearby is anticipated to cause...
23 CFR 630.1010 - Significant projects.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Significant projects. 630.1010 Section 630.1010 Highways... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1010 Significant projects. (a) A significant project is one that, alone or in combination with other concurrent projects nearby is anticipated to cause...
23 CFR 630.1010 - Significant projects.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Significant projects. 630.1010 Section 630.1010 Highways... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1010 Significant projects. (a) A significant project is one that, alone or in combination with other concurrent projects nearby is anticipated to cause...
23 CFR 630.1010 - Significant projects.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Significant projects. 630.1010 Section 630.1010 Highways... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1010 Significant projects. (a) A significant project is one that, alone or in combination with other concurrent projects nearby is anticipated to cause...
23 CFR 630.1010 - Significant projects.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Significant projects. 630.1010 Section 630.1010 Highways... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1010 Significant projects. (a) A significant project is one that, alone or in combination with other concurrent projects nearby is anticipated to cause...
1987-11-24
of the assortment of manufactured parts for partial and complete frames, as well as abutments , support walls, and bridgehead construction...Uniform Series II Generation based on anticipated spans; and • Increased effectiveness of prefabrication for steel and masonry bridge construction...support structures and abutments . Parallel to and on an equal par with standard primary construction trades already cited, the scientific-technical
DOE Office of Scientific and Technical Information (OSTI.GOV)
Middleton, Bobby D.; Rodriguez, Salvador B.; Carlson, Matthew David
This report outlines the work completed for a Laboratory Directed Research and Development project at Sandia National Laboratories from October 2012 through September 2015. An experimental supercritical carbon dioxide (sCO 2 ) loop was designed, built, and o perated. The experimental work demonstrated that sCO 2 can be uti lized as the working fluid in an air - cooled, natural circulation configuration to transfer heat from a source to the ultimate heat sink, which is the surrounding ambient environment in most ca ses. The loop was also operated in an induction - heated, water - cooled configuration that allows formore » measurements of physical parameters that are difficult to isolate in the air - cooled configuration. Analysis included the development of two computational flu id dynamics models. Future work is anticipated to answer questions that were not covered in this project.« less
Shaping America's Transportation Future: Annual Project Accomplishments.
DOT National Transportation Integrated Search
2016-01-01
Volpes mission is to improve the transportation system by anticipating emerging issues and advancing technical, operational, and institutional innovations. Shaping Americas Transportation Future: Annual Project Accomplishments highlights Volpe...
NASA Astrophysics Data System (ADS)
Sege, J.; Li, Y.; Chang, C. F.; Chen, J.; Chen, Z.; Rubin, Y.; Li, X.; Hehua, Z.; Wang, C.; Osorio-Murillo, C. A.
2015-12-01
This study will develop a numerical model to characterize the perturbation of local groundwater systems by underground tunnel construction. Tunnels and other underground spaces act as conduits that remove water from the surrounding aquifer, and may lead to drawdown of the water table. Significant declines in water table elevation can cause environmental impacts by altering root zone soil moisture and changing inflows to surface waters. Currently, it is common to use analytical solutions to estimate groundwater fluxes through tunnel walls. However, these solutions often neglect spatial and temporal heterogeneity in aquifer parameters and system stresses. Some heterogeneous parameters, such as fracture densities, can significantly affect tunnel inflows. This study will focus on numerical approaches that incorporate heterogeneity across a range of scales. Time-dependent simulations will be undertaken to compute drawdown at various stages of excavation, and to model water table recovery after low-conductivity liners are applied to the tunnel walls. This approach will assist planners in anticipating environmental impacts to local surface waters and vegetation, and in computing the amount of tunnel inflow reduction required to meet environmental targets. The authors will also focus on managing uncertainty in model parameters. For greater planning applicability, extremes of a priori parameter ranges will be explored in order to anticipate best- and worst-case scenarios. For calibration and verification purposes, the model will be applied to a completed tunnel project in Mount Mingtang, China, where tunnel inflows were recorded throughout the construction process.
NASA Astrophysics Data System (ADS)
Edra Nisa Lau, Santi; Zakaria, Rozana; Aminudin, Eeydzah; Saar, Chai Chang; Yusof, Aswadi; Fatihi Hafifi Che Wahid, Che Muhammad
2018-04-01
Pre-construction is one of the biggest areas of risk and uncertainty in construction project as it deals with subsurface ground conditions information. The amount of detail data needed in pre-construction especially for existing data modelling and site analysis should be sufficient enough to ensure that significant risks could not reasonably be anticipated. Current practicing method in interpreting data during this stage tasks reveal limitation. Construction industry faced many obstacles due to the depends on the traditional practice; paper-based document which missing and redundant data always happened. In recent years, there has been a shift in construction where people move to BIM application because of its potential to reduce the problem faced by infrastructure world. BIM has become a successful technology and widely popular in the construction world especially in developed countries because of its potential. Nowadays, people are moving one step ahead in BIM which is adoption of BIM during pre-construction stage. Thus, this paper review studies centered on BIM-integrated modelling during preconstruction stage. But there is lack of practical researches have been made during this stage. Although a large number of studies on BIM have been conducted in the past decade, a lack of consensus remains among researchers and practitioners regarding the applications of BIM during pre-construction stage, the availability of subsequent data integration tool for geotechnical activity. A comprehensive literature review was conducted for data collection and analysis. After in-depth review of journal articles widely cover the application of BIM, this study summarizes an overview and critical reflection of geotechnical data integration using BIM during pre-construction stage. The results are useful for the identification of research clusters and topics in the BIM community.
Erlandsson, Arvid; Jungstrand, Amanda Å.; Västfjäll, Daniel
2016-01-01
One important motivation for people behaving prosocially is that they want to avoid negative and obtain positive emotions. In the prosocial behavior literature however, the motivations to avoid negative emotions (e.g., guilt) and to approach positive emotions (e.g., warm glow) are rarely separated, and sometimes even aggregated into a single mood-management construct. The aim of this study was to investigate whether anticipated guilt if not helping and anticipated warm glow if helping are influenced similarly or differently when varying situational factors related to personal responsibility to help. Helping scenarios were created and pilot tests established that each helping scenario could be formulated both in a high-responsibility version and in a low-responsibility version. In Study 1 participants read high-responsibility and low-responsibility helping scenarios, and rated either their anticipated guilt if not helping or their anticipated warm glow if helping (i.e., separate evaluation). Study 2 was similar but here participants rated both their anticipated guilt if not helping and their anticipated warm glow if helping (i.e., joint evaluation). Anticipated guilt was clearly higher in the high-responsibility versions, but anticipated warm glow was unaffected (in Studies 1a and 1b), or even higher in the low-responsibility versions (Study 2). In Studies 3 (where anticipated guilt and warm glow were evaluated separately) and 4 (where they were evaluated jointly), personal responsibility to help was manipulated within-subjects. Anticipated guilt was again constantly higher in the high-responsibility versions but for many types of responsibility-manipulations, anticipated warm glow was higher in the low-responsibility versions. The results suggest that we anticipate guilt if not fulfilling our responsibility but that we anticipate warm glow primarily when doing over and beyond our responsibility. We argue that future studies investigating motivations for helping should measure both anticipated negative consequences for oneself if not helping, and anticipated positive consequences for oneself if helping. PMID:27733840
Erlandsson, Arvid; Jungstrand, Amanda Å; Västfjäll, Daniel
2016-01-01
One important motivation for people behaving prosocially is that they want to avoid negative and obtain positive emotions. In the prosocial behavior literature however, the motivations to avoid negative emotions (e.g., guilt) and to approach positive emotions (e.g., warm glow) are rarely separated, and sometimes even aggregated into a single mood-management construct. The aim of this study was to investigate whether anticipated guilt if not helping and anticipated warm glow if helping are influenced similarly or differently when varying situational factors related to personal responsibility to help. Helping scenarios were created and pilot tests established that each helping scenario could be formulated both in a high-responsibility version and in a low-responsibility version. In Study 1 participants read high-responsibility and low-responsibility helping scenarios, and rated either their anticipated guilt if not helping or their anticipated warm glow if helping (i.e., separate evaluation). Study 2 was similar but here participants rated both their anticipated guilt if not helping and their anticipated warm glow if helping (i.e., joint evaluation). Anticipated guilt was clearly higher in the high-responsibility versions, but anticipated warm glow was unaffected (in Studies 1a and 1b), or even higher in the low-responsibility versions (Study 2). In Studies 3 (where anticipated guilt and warm glow were evaluated separately) and 4 (where they were evaluated jointly), personal responsibility to help was manipulated within-subjects. Anticipated guilt was again constantly higher in the high-responsibility versions but for many types of responsibility-manipulations, anticipated warm glow was higher in the low-responsibility versions. The results suggest that we anticipate guilt if not fulfilling our responsibility but that we anticipate warm glow primarily when doing over and beyond our responsibility. We argue that future studies investigating motivations for helping should measure both anticipated negative consequences for oneself if not helping, and anticipated positive consequences for oneself if helping.
Space Pioneers and where they are now
NASA Technical Reports Server (NTRS)
Montoya, Earl J.; Fimmel, Richard O.
1987-01-01
A description of the Pioneer project, its history and achievements is given. Major discoveries concerning near and interplanetary space, the planets, and various comets are outlined. Anticipated future observations are considered. A list of Pioneer project launches, 1986 statuses, and project firsts is given.
Acuity-adaptable nursing care: exploring its place in designing the future patient room.
Kwan, Melissa A
2011-01-01
To substantiate the anticipated benefits of the original acuity-adaptable care delivery model as defined by innovator Ann Hendrich. In today's conveyor belt approach to healthcare, upon admission and through discharge, patients are commonly transferred based on changing acuity needs. Wasted time and money and inefficiencies in hospital operations often result-in addition to jeopardizing patient safety. In the last decade, a handful of hospitals pioneered the implementation of the acuity-adaptable care delivery model. Built on the concept of eliminating patient transfers, the projected outcomes of acuity-adaptable units-decreased average lengths of stay, increased patient safety and satisfaction, and increased nurses' satisfaction from reduced walking distances-make a good case for a model patient room. Although some hospitals experienced the projected benefits of the acuity-adaptable care delivery model, sustaining the outcomes proved to be difficult; hence, the original definition of acuity-adaptable units has not fared well. Variations on the original concept demonstrate that eliminating patient transfers has not been completely abandoned in healthcare redesign and construction initiatives. Terms such as flex-up, flex-down, universal room, and single-stay unit have since emerged. These variations convolute the search for empirical evidence to support the anticipated benefits of the original concept. To determine the future of this concept and its variants, a significant amount of outcome data must be generated by piloting the concept in different hospital settings. As further refinements and adjustments to the concept emerge, the acuity-adaptable room may find a place in future hospitals.
DOT National Transportation Integrated Search
2014-09-12
In anticipation of regulation involving numeric turbidity limit at highway construction sites, research was : done into the most appropriate, affordable methods for surface water monitoring. Measuring sediment : concentration in streams may be conduc...
Monitoring and projecting snow on Hawaii Island
NASA Astrophysics Data System (ADS)
Zhang, Chunxi; Hamilton, Kevin; Wang, Yuqing
2017-05-01
The highest mountain peaks on Hawaii Island are snow covered for part of almost every year. This snow has aesthetic and recreational value as well as cultural significance for residents and visitors. Thus far there have been almost no systematic observations of snowfall, snow cover, or snow depth in Hawaii. Here we use satellite observations to construct a daily index of Hawaii Island snow cover starting from 2000. The seasonal mean of our index displays large interannual variations that are correlated with the seasonal mean freezing level and frequency of trade wind inversions as determined from nearby balloon soundings. Our snow cover index provides a diagnostic for monitoring climate variability and trends within the extensive area of the globe dominated by the North Pacific trade wind meteorological regime. We have also conducted simulations of the Hawaii climate with a regional atmospheric model. Retrospective simulations for 1990-2015 were run with boundary conditions prescribed from gridded observational analyses. Simulations for the end of 21st century employed boundary conditions based on global climate model projections that included standard scenarios for anticipated anthropogenic climate forcing. The future projections indicate that snowfall will nearly disappear by the end of the current century.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Champion, Mark S; Dean, Robert A; Galambos, John D
The Proton Power Upgrade Project is underway at the Spallation Neutron Source at Oak Ridge National Labor-atory and will double the proton beam power capability from 1.4 MW to 2.8 MW to provide increased neutron intensity at the first target station and to support future operation of the second target station. This will be ac-complished by increasing the beam energy to 1.3 GeV and the beam current to 38 mA (average during the macropulse). Installation of 28 additional superconduct-ing cavities and their associated technical systems will provide for the energy increase. Increased beam loading throughout the accelerator will be accommodatedmore » primar-ily through the use of existing margin in the RF systems and the installation of 700 kW klystrons to power the new superconducting cavities. Upgrades of a few existing RF stations may also be needed. The injection and ex-traction regions of the accumulator ring will be upgraded, a ring to second target station tunnel stub will be con-structed, and a 2 MW target will be developed for the first target station. The project anticipates attainment of Criti-cal Decision 1 in 2017 to ratify the project conceptual design and cost range.« less
Geothermal Power Generation Plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boyd, Tonya
2013-12-01
Oregon Institute of Technology (OIT) drilled a deep geothermal well on campus (to 5,300 feet deep) which produced 196°F resource as part of the 2008 OIT Congressionally Directed Project. OIT will construct a geothermal power plant (estimated at 1.75 MWe gross output). The plant would provide 50 to 75 percent of the electricity demand on campus. Technical support for construction and operations will be provided by OIT’s Geo-Heat Center. The power plant will be housed adjacent to the existing heat exchange building on the south east corner of campus near the existing geothermal production wells used for heating campus. Coolingmore » water will be supplied from the nearby cold water wells to a cooling tower or air cooling may be used, depending upon the type of plant selected. Using the flow obtained from the deep well, not only can energy be generated from the power plant, but the “waste” water will also be used to supplement space heating on campus. A pipeline will be construction from the well to the heat exchanger building, and then a discharge line will be construction around the east and north side of campus for anticipated use of the “waste” water by facilities in an adjacent sustainable energy park. An injection well will need to be drilled to handle the flow, as the campus existing injection wells are limited in capacity.« less
Data Analysis & Statistical Methods for Command File Errors
NASA Technical Reports Server (NTRS)
Meshkat, Leila; Waggoner, Bruce; Bryant, Larry
2014-01-01
This paper explains current work on modeling for managing the risk of command file errors. It is focused on analyzing actual data from a JPL spaceflight mission to build models for evaluating and predicting error rates as a function of several key variables. We constructed a rich dataset by considering the number of errors, the number of files radiated, including the number commands and blocks in each file, as well as subjective estimates of workload and operational novelty. We have assessed these data using different curve fitting and distribution fitting techniques, such as multiple regression analysis, and maximum likelihood estimation to see how much of the variability in the error rates can be explained with these. We have also used goodness of fit testing strategies and principal component analysis to further assess our data. Finally, we constructed a model of expected error rates based on the what these statistics bore out as critical drivers to the error rate. This model allows project management to evaluate the error rate against a theoretically expected rate as well as anticipate future error rates.
Soil warming response: field experiments to Earth system models
NASA Astrophysics Data System (ADS)
Todd-Brown, K. E.; Bradford, M.; Wieder, W. R.; Crowther, T. W.
2017-12-01
The soil carbon response to climate change is extremely uncertain at the global scale, in part because of the uncertainty in the magnitude of the temperature response. To address this uncertainty we collected data from 48 soil warming manipulations studies and examined the temperature response using two different methods. First, we constructed a mixed effects model and extrapolated the effect of soil warming on soil carbon stocks under anticipated shifts in surface temperature during the 21st century. We saw significant vulnerability of soil carbon stocks, especially in high carbon soils. To place this effect in the context of anticipated changes in carbon inputs and moisture shifts, we applied a one pool decay model with temperature sensitivities to the field data and imposed a post-hoc correction on the Earth system model simulations to integrate the field with the simulated temperature response. We found that there was a slight elevation in the overall soil carbon losses, but that the field uncertainty of the temperature sensitivity parameter was as large as the variation in the among model soil carbon projections. This implies that model-data integration is unlikely to constrain soil carbon simulations and highlights the importance of representing parameter uncertainty in these Earth system models to inform emissions targets.
ERIC Educational Resources Information Center
Friedman, Robert M.; Evans, Mary; Morrison-Rodriguez, Barbara; Kutash, Krista; Duchnowski, Al; Hernandez, Mario; Hodges, Sharon; Armstrong, Mary; Pires, Sheila; Stroul, Beth; Greenbaum, Paul; Brown, Eric; Lazear, Katherine
This paper describes each of eight current interrelated federally funded research projects conducted by the Research and Training Center for Children's Mental Health at the University of South Florida. For each project, information is provided on the project's background, purpose, methodology, and anticipated results. Project titles and principal…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-07
... mapped, is anticipated to involve approximately 3.1 miles of new specified road construction, approximately 10.7 miles of temporary road construction, approximately 6.7 miles of additional temporary road use on the existing road prism, and approximately 2.6 miles of road reconstruction. Approximately 3.8...
7 CFR 1219.50 - Budgets, programs, plans, and projects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 10 2010-01-01 2010-01-01 false Budgets, programs, plans, and projects. 1219.50... Order Budgets, Expenses, and Assessments § 1219.50 Budgets, programs, plans, and projects. (a) The Board shall submit to the Secretary, on a fiscal period basis, annual budgets of its anticipated expenses and...
Comprehensive evaluation of transportation projects : a toolkit for sketch planning.
DOT National Transportation Integrated Search
2010-10-01
A quick-response project-planning tool can be extremely valuable in anticipating the congestion, safety, : emissions, and other impacts of large-scale network improvements and policy implementations. This report : identifies the advantages and limita...
The Full Scale Seal Experiment - A Seal Industrial Prototype for Cigeo - 13106
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lebon, P.; Bosgiraud, J.M.; Foin, R.
2013-07-01
The Full Scale Seal (FSS) Experiment is one of various experiments implemented by Andra, within the frame of the Cigeo (the French Deep Geological Repository) Project development, to demonstrate the technical construction feasibility and performance of seals to be constructed, at time of Repository components (shafts, ramps, drifts, disposal vaults) progressive closure. FSS is built inside a drift model fabricated on surface for the purpose. Prior to the scale 1:1 seal construction test, various design tasks are scheduled. They include the engineering work on the drift model to make it fit with the experimental needs, on the various work sequencesmore » anticipated for the swelling clay core emplacement and the concrete containment plugs construction, on the specialized handling tools (and installation equipment) manufactured and delivered for the purpose, and of course on the various swelling clay materials and low pH (below 11) concrete formulations developed for the application. The engineering of the 'seal-as-built' commissioning means (tools and methodology) must also be dealt with. The FSS construction experiment is a technological demonstrator, thus it is not focused on the phenomenological survey (and by consequence, on the performance and behaviour forecast). As such, no hydration (forced or natural) is planned. However, the FSS implementation (in particular via the construction and commissioning activities carried out) is a key milestone in view of comforting phenomenological extrapolation in time and scale. The FSS experiment also allows for qualifying the commissioning methods of a real sealing system in the Repository, as built, at time of industrial operations. (authors)« less
Valley Topological Phases in Bilayer Sonic Crystals
NASA Astrophysics Data System (ADS)
Lu, Jiuyang; Qiu, Chunyin; Deng, Weiyin; Huang, Xueqin; Li, Feng; Zhang, Fan; Chen, Shuqi; Liu, Zhengyou
2018-03-01
Recently, the topological physics in artificial crystals for classical waves has become an emerging research area. In this Letter, we propose a unique bilayer design of sonic crystals that are constructed by two layers of coupled hexagonal array of triangular scatterers. Assisted by the additional layer degree of freedom, a rich topological phase diagram is achieved by simply rotating scatterers in both layers. Under a unified theoretical framework, two kinds of valley-projected topological acoustic insulators are distinguished analytically, i.e., the layer-mixed and layer-polarized topological valley Hall phases, respectively. The theory is evidently confirmed by our numerical and experimental observations of the nontrivial edge states that propagate along the interfaces separating different topological phases. Various applications such as sound communications in integrated devices can be anticipated by the intriguing acoustic edge states enriched by the layer information.
Newton, Joshua D; Newton, Fiona J; Ewing, Michael T; Burney, Sue; Hay, Margaret
2013-01-01
Moral norms and anticipated regret are widely used extensions to the theory of planned behaviour, yet there is some evidence to suggest that these constructs may conceptually overlap as predictors of intention. Two health-related behaviours with distinct moral implications (Study 1: organ donation registration, N = 352 and Study 2: condom usage, N = 1815) were therefore examined to ascertain whether moral norms and anticipated regret are indeed conceptually distinct. While evidence consistent with conceptual overlap was identified in Study 1, the evidence for such overlap in Study 2 was more ambiguous. In Study 3, a meta-analysis of existing literature revealed that the relationship between moral norms and anticipated regret was moderated by the extent of the moral implications arising from the behaviour under examination. Taken together, these findings suggest that conceptual overlap between moral norms and anticipated regret is more likely to occur among behaviours with obvious moral implications. Researchers wishing to examine the predictive utility of moral norms and anticipated regret among such behaviours would therefore be advised to aggregate these measures to form a composite variable (personal norms).
Deductive Sensemaking Principles Using Personal Constructs of the Field Commanders
2007-06-01
unclassified b . ABSTRACT unclassified c. THIS PAGE unclassified ABSTRACT The virtue of defining and measuring the commander’s performance solely...seeing the world in which he lives; ( b ) the individual builds constructs and tries them on evolving contexts; (c) the construct can be applied to...ability to (a) anticipate future state of nature; ( b ) cope with state changing in the battlefield; and (c) replicate past experiences and map them into
18 CFR 806.31 - Term of approvals.
Code of Federal Regulations, 2010 CFR
2010-04-01
... approval issued under this part shall be no longer than 15 years or the anticipated life of the project... AND APPROVAL OF PROJECTS Terms and Conditions of Approval § 806.31 Term of approvals. (a) Approvals... approval of a project shall expire three years from the date of such approval if the withdrawal, diversion...
77 FR 59921 - Wisconsin Public Service Corporation; Notice of Environmental Site Review
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-01
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1940-000 Wisconsin; Project No. 1966-000 Wisconsin] Wisconsin Public Service Corporation; Notice of Environmental Site Review In anticipation of the filing of Notices of Intent (NOI) and Pre- Application Documents for the Grandfather Falls Hydroelectric Project No. 1966 and...
26 CFR 1.43-4 - Qualified enhanced oil recovery costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... the anticipated use in a project or activity is a reasonable method. (b) Costs defined—(1) Qualified... used in the tertiary recovery method. Therefore, the storage tank is used directly in the project and... qualified tertiary recovery method. As part of the enhanced oil recovery project, K drills injection wells...
Models, Their Application, and Scientific Anticipation: Ludwig Boltzmann's Work as Tacit Knowing
ERIC Educational Resources Information Center
Schmitt, Richard Henry
2011-01-01
Ludwig Boltzmann's work in theoretical physics exhibits an approach to the construction of theory that he transmitted to the succeeding generation by example. It involved the construction of clear models, allowed more than one, and was not based solely on the existing facts, with the intent of examining and criticizing the assumptions that made…
Dynamics of on-orbit construction process
NASA Technical Reports Server (NTRS)
Chiou, J. C.; Alexander, S.; Natori, M. C.; Mikulas, M.; Park, K. C.
1991-01-01
The topics covered are presented in viewgraph form and include the following: problem definition and motivation; survey of current technology; focus problems; approach; progress/discussion; and future direction and anticipated results.
Health and safety implications of alternative energy technologies. II. Solar
NASA Astrophysics Data System (ADS)
Etnier, E. L.; Watson, A. P.
1981-09-01
No energy technology is risk free when all aspects of its utilization are taken into account. Every energy technology has some attendant direct and indirect health and safety concerns. Solar technologies examined in this paper are wind, ocean thermal energy gradients, passive, photovoltaic, satellite power systems, low- and high-temperature collectors, and central power stations, as well as tidal power. For many of these technologies, insufficient historical data are available from which to assess the health risks and environmental impacts. However, their similarities to other projects make certain predictions possible. For example, anticipated problems in worker safety in constructing ocean thermal energy conversion systems will be similar to those associated with other large-scale construction projects, like deep-sea oil drilling platforms. Occupational hazards associated with photovoltaic plant operation would be those associated with normal electricity generation, although for workers involved in the actual production of photovoltaic materials, there is some concern for the toxic effects of the materials used, including silicon, cadmium, and gallium arsenide. Satellite power systems have several unique risks. These include the effects of long-term space travel for construction workers, effects on the ozone layer and the attendant risk of skin cancer in the general public, and the as-yet-undetermined effects of long-term, low-level microwave exposure. Hazards may arise from three sources in solar heating and cooling systems: water contamination from corrosion inhibitors, heat transfer fluids, and bactericides; collector over-heating, fires, and “out-gassing” and handling and disposal of system fluids and wastes. Similar concerns exist for solar thermal power systems. Even passive solar systems may increase indoor exposure levels to various air pollutants and toxic substances, eitherdirectly from the solar system itself or indirectly by trapping released pollutants from furnishings, building materials, and indoor combustion.
Phased project planning and development in anticipation of operational programs
NASA Technical Reports Server (NTRS)
Stroud, W. G.
1973-01-01
The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.
2009-10-01
adverse impacts on geology and soils would be anticipated due to construction and demolition activities, such as grading, excavation, and...2, during construction and demolition activities would limit adverse impacts on geology and soils. Therefore, no long-term, adverse, direct or...20 99 113 70 70 99 65 70 20 Live Oak Loma Rica Tierra Buena Wheatland Lincoln Linda Marysville Olivehurst South Yuba City Yuba City Source: ESRI
Antenna Electronics Concept for the Next-Generation Very Large Array
NASA Astrophysics Data System (ADS)
Beasley, Anthony J.; Jackson, Jim; Selina, Robert
2017-01-01
The National Radio Astronomy Observatory (NRAO), in collaboration with its international partners, completed two major projects over the past decade: the sensitivity upgrade for the Karl Jansky Very Large Array (VLA) and the construction of the Atacama Large Millimeter/Sub-Millimeter Array (ALMA). The NRAO is now considering the scientific potential and technical feasibility of a next-generation VLA (ngVLA) with an emphasis on thermal imaging at milli-arcsecond resolution. The preliminary goals for the ngVLA are to increase both the system sensitivity and angular resolution of the VLA tenfold and to cover a frequency range of 1.2-116 GHz.A number of key technical challenges have been identified for the project. These include cost-effective antenna manufacturing (in the hundreds), suitable wide-band feed and receiver designs, broad-band data transmission, and large-N correlators. Minimizing the overall operations cost is also a fundamental design requirement.The designs of the antenna electronics, reference distribution system, and data transmission system are anticipated to be major construction and operations cost drivers for the facility. The electronics must achieve a high level of performance, while maintaining low operation and maintenance costs and a high level of reliability. Additionally, due to the uncertainty in the feasibility of wideband receivers, advancements in digitizer technology, and budget constraints, the hardware system architecture should be scalable to the number of receiver bands and the speed and resolution of available digitizers.Here, we present the projected performance requirements of the ngVLA, a proposed block diagram for the instrument’s electronics systems, parameter tradeoffs within the system specifications, and areas of technical risk where technical advances may be required for successful production and installation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
DEXTER, M.L.
1999-11-15
This document serves as a notice of construction (NOC) pursuant to the requirements of Washington Administrative Code (WAC) 246 247-060, and as a request for approval to modify pursuant to 40 Code of Federal Regulations (CFR) 61 07 for the installation and operation of one waste retrieval system in the 24 1 AP-102 Tank and one waste retrieval system in the 241 AP 104 Tank Pursuant to 40 CFR 61 09 (a)( 1) this application is also intended to provide anticipated initial start up notification Its is requested that EPA approval of this application will also constitute EPA acceptance ofmore » the initial start up notification Project W 211 Initial Tank Retrieval Systems (ITRS) is scoped to install a waste retrieval system in the following double-shell tanks 241-AP 102-AP 104 AN 102, AN 103, AN-104, AN 105, AY 102 AZ 102 and SY-102 between now and the year 2011. Because of the extended installation schedules and unknowns about specific activities/designs at each tank, it was decided to submit NOCs as that information became available This NOC covers the installation and operation of a waste retrieval system in tanks 241 AP-102 and 241 AP 104 Generally this includes removal of existing equipment installation of new equipment and construction of new ancillary equipment and buildings Tanks 241 AP 102 and 241 AP 104 will provide waste feed for immobilization into a low activity waste (LAW) product (i.e. glass logs) The total effective dose equivalent (TEDE) to the offsite maximally exposed individual (MEI) from the construction activities is 0 045 millirem per year The unabated TEDE to the offsite ME1 from operation of the mixer pumps is 0 042 millirem per year.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
....; FirstLight Power Resources; Notice of Environmental Site Review In anticipation of the filing of a... Project No. 1904), and two projects owned and operated by FirstLight Power Resources in Massachusetts.... Location: Vernon Station, 152 Governor Hunt Road, Vernon VT 05354. FirstLight's Projects FirstLight will...
A Manual for Proposal Planning and Development within the College of Education.
ERIC Educational Resources Information Center
Kussrow, Paul G.
A guide to writing effective proposals that are designed to funding for specific projects is presented. The need to clearly identify the nature of project--its design, its anticipated outcomes, and the needs which the project is addressing--is described as the crucial first step in the grantswriting process. Next, the importance of the prospectus…
2016-08-01
of the operational environment to anticipate the impacts that siting and operating CBs will have on the local context, and to consider the effects ...17 Figure 7. Density and effective proximity factor (McNulty 2009b...Area-wise consumption of cement, FY2010 (Nahar 2011). ...............................44 Figure 23. Overview of Bangladesh [green: office, orange
New Ideas in Construction for Vocational Education.
ERIC Educational Resources Information Center
Office of Education (DHEW), Washington, DC.
One of the most dramatic developments of the new educational programs is the increase in the construction of area vocational schools in the past two and a half years from a total of 405 to 975. The anticipated enrollments by 1975 will almost triple the present enrollments, and to accommodate them there is a need for 1,885 vocational area schools.…
Environmental Assessment -- Hydrothermal Geothermal Subprogram
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1979-06-01
This environmental impact assessment addresses the design, construction, and operation of an electric generating plant (3 to 4 MWe) and research station (Hawaii Geothermal Research Station (HGRS)) in the Puna district on the Island of Hawaii. The facility will include control and support buildings, parking lots, cooling towers, settling and seepage ponds, the generating plant, and a visitors center. Research activities at the facility will evaluate the ability of a successfully flow-tested well (42-day flow test) to provide steam for power generation over an extended period of time (two years). In future expansion, research activities may include direct heat applicationsmore » such as aquaculture and the effects of geothermal fluids on various plant components and specially designed equipment on test modules. Construction-related impacts would be relatively minor. Construction of the facility will require the distance of about 1.7 ha (4.1 acres). No further disturbance is anticipated, unless it becomes necessary to replace the seepage pond with an injection well, because the production well is in service and adjacent roads and transmission lines are adequate. Disruption of competing land uses will be minimal, and loss of wildlife habitat will be acceptable. Noise should not significantly affect wildlife and local residents; the most noise activities (well drilling and flow testing) have been completed. Water use during construction will not be large, and impacts on competing uses are unlikely. Socio-economic impacts will be small because the project will not employ a large number of local residents and few construction workers will need to find local housing.« less
Conceptual Design of the Chornobyl New Safe Confinement - an Overview
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kulishenko, Valery N.; Hogg, Charles; Schmieman, Eric A.
2006-05-01
The Object Shelter, constructed over the Chornobyl nuclear power plant that was destroyed by a 1986 accident, is at risk of collapse. The Consortium of Bechtel, Electricité De France, and Battelle, in cooperation with subcontractor КСК, recently completed the conceptual design for a New Safe Confinement (NSC) building to reduce Shelter corrosion, to mitigate the consequences of potential collapse, and to enable the safe deconstruction of unstable structures. The arch-shaped NSC will be constructed at a distance from the Shelter to minimize radiation exposure to construction workers, and then slid into place over the Shelter. After sliding, cranes and othermore » tools inside the NSC will be remotely operated for deconstruction of the Shelter. The NSC is designed for a 100-year life. Bechtel designed the arch structure and was responsible for project management functions. Electricité De France designed the foundations and designed deconstruction of the Object Shelter unstable elements. Battelle performed safety analyses and environmental impact assessment. КСК (a consortium of КIЕЛ [KIEP], НДIБК [NIISK], and МНТЦ [ISTC]), as a working partner in all aspects of the design and analysis processes, was the Ukrainian licensed engineer for conceptual design. The design is currently being reviewed by Ukrainian regulatory authorities. An open international tender for detailed design and construction is anticipated to be announced by the European Bank for Reconstruction and Development in December, 2003, with two-stage bid evaluation beginning in April, 2004.« less
Protecting young children against skin cancer: Parental beliefs, roles, and regret.
Hamilton, Kyra; Kirkpatrick, Aaron; Rebar, Amanda; White, Katherine M; Hagger, Martin S
2017-12-01
To examine the role of parental beliefs, roles, and anticipated regret toward performing childhood sun-protective behaviours. Parents (N = 230; 174 mothers, 56 fathers), recruited using a nonrandom convenience sample, of at least 1 child aged between 2 and 5 years completed an initial questionnaire assessing demographics and past behaviour as well as theory of planned behaviour global (attitude, subjective norm, and perceived behavioural control) and belief-based (behavioural, normative, and control beliefs) measures, role construction, and anticipated regret regarding their intention and behaviour to protect their child from the sun. Two weeks later, participants completed a follow-up questionnaire assessing their sun protection of their child during the previous 2 weeks. Hierarchical multiple regression analysis identified attitude, perceived behavioural control, role construction, anticipated regret, past behaviour, and a normative belief ("current partner/other family members") as significant predictors of parents' intention to participate in sun-protective behaviour for their child. Intention and past behaviour were significant predictors of parents' follow-up sun-protective behaviour. The regression models explained 64% and 36% of the variance in intention and behaviour, respectively. The findings of this study highlight the importance of anticipated regret and role-related beliefs alongside personal, normative, and control beliefs in determining parents' intentional sun-protective behaviour for their children. Findings may inform the development of parent- and community-based sun protection intervention programs to promote parents' sun-safety behaviours for their children to prevent future skin cancer incidence. Copyright © 2017 John Wiley & Sons, Ltd.
Processing and thermodynamics research, Volume II. Monthly progress report, November 1984
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Data assembly is in progress on the Venezuelan Cerro Negro, California, Wilmington and Mexican Mayan crudes. A draft of a proposal is in preparation that might join this correlational work with complementary correlational work at the University of Oklahoma (Project BPT1). Cerro Negro 200 to 425/sup 0/C and 425 to 550/sup 0/C saturate fractions were analyzed with the CEC 21-103 mass spectrometer using ASTM method D2786, and experiments were devised to establish reproducibility of analyses with the KRATOS MS-50 (Project BPT2). Thermodynamic property measurements on organic nitrogen compounds included a liquid phase heat capacity study of 2,5-dimethylpyridine, and the oxygenmore » sensitivity of phenanthridine was checked prior to bomb calorimetry (Project BPT3A). Heat capacity measurements on chroman are progressing well, and vapor pressure measurements of tetrahydrophenanthrene are in progress (Project BPT3B). Work was begun on the design and procurement of equipment necessary for construction of a bench scale catalytic cracking unit. The supercritical extraction unit is being assembled (Project OPT1). Thiopene separations were begun on Cerro Negro 425 to 550/sup 0/C neutrals, and separation of sulfides from Cerro Negro 550 to 700/sup 0/C and 700+/sup 0/C neutrals was completed (Project OPT2). Preparations for PVT studies of methanol are nearing completion, and a list of critically needed PVT measurements was reviewed to help select the next compound for study. A possible candidate is hydrogen sulfide. (Project OPT3). Good progress continues in the treatment of the RP feed (Project OPT4) to recover Milspec F-76. It is anticipated that 85% recovery is possible by the chemical treatment/distillation process.« less
46 CFR 108.235 - Construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... intended to use the facility as well as environmental loadings (wind, wave, water, snow, etc.) anticipated... structure, existing stresses in the deck when it is an integral part of a unit's structure, and each of the...
46 CFR 108.235 - Construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... intended to use the facility as well as environmental loadings (wind, wave, water, snow, etc.) anticipated... structure, existing stresses in the deck when it is an integral part of a unit's structure, and each of the...
Prospective Payment and Baccalaureate Nursing Education: Projections for the Future.
ERIC Educational Resources Information Center
Van Ort, Suzanne; And Others
1989-01-01
Changes in the health care delivery system and projected changes in baccalaureate nursing education anticipated in the wake of implementation of the prospective payment system for health care services are examined. The discussion is based on the results of a national survey. (MSE)
Kennedy Space Center Florida Scrub-Jay Compensation Plan
NASA Technical Reports Server (NTRS)
Pitcock, Taylor Morgan (Compiler)
2014-01-01
Many organizations have interest in using NASA property on KSC. The purpose of this document is to consolidate the goals of ecosystem management associated with Florida Scrub-Jays and compliance with the Endangered Species Act (ESA) in order to streamline and reduce the costs of facility planning, impact assessment, and impact minimization. This will simplify the process and reduce regulatory uncertainty.However, the resulting process must be consistent with the Merritt Island National Wildlife Refuge (MINWR) Comprehensive Conservation Plan (CCP). In addition, this document considers anticipated construction impacts on KSC during the next 10 years and summarizes priorities in a spatially explicit manner. The document describes anticipated compensation requirements to facilitate restoration of degraded habitat in areas most important to the KSC Scrub-Jay population through resources provided to MINWR. The plan assumes that all construction on KSC is compensated on KSC.
ERIC Educational Resources Information Center
McMinn, William G.
This report is an update of a report on the development and status of various programs in architecture and related fields in the State University System of Florida, a report that was submitted to the Board of Regents in May 1983. The objectives of this updated report, like those of the earlier one, are to review the anticipated needs of the…
Geoengineering properties of potential repository units at Yucca Mountain, southern Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tillerson, J.R.; Nimick, F.B.
1984-12-01
The Nevada Nuclear Waste Storage Investigations (NNWSI) Project is currently evaluating volcanic tuffs at the Yucca Mountain site, located on and adjacent to the Nevada Test Site, for possible use as a host rock for a radioactive waste repository. The behavior of tuff as an engineering material must be understood to design, license, construct, and operate a repository. Geoengineering evaluations and measurements are being made to develop confidence in both the analysis techniques for thermal, mechanical, and hydrothermal effects and the supporting data base of rock properties. The analysis techniques and the data base are currently used for repository design,more » waste package design, and performance assessment analyses. This report documents the data base of geoengineering properties used in the analyses that aided the selection of the waste emplacement horizon and in analyses synopsized in the Environmental Assessment Report prepared for the Yucca Mountain site. The strategy used for the development of the data base relies primarily on data obtained in laboratory tests that are then confirmed in field tests. Average thermal and mechanical properties (and their anticipated variations) are presented. Based upon these data, analyses completed to date, and previous excavation experience in tuff, it is anticipated that existing mining technology can be used to develop stable underground openings and that repository operations can be carried out safely.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Russell, J.S.
Several factors in the development of the East Wilmington oil field by THUMS Long Beach Co. are described. These include: critical path scheduling, complex stratigraphy, reservoir engineering, drilling program, production methods, pressure maintenance, crude oil processing, automation, transportation facilities, service lines, and electrical facilities. The complexity and closely scheduled operational events interwoven in the THUMS project demands a method for the carefully planned sequence of jobs to be done, beginning with island construction up through routine production and to the LACT system. These demanding requirements necessitated the use of a critical path scheduling program. It was decided to use themore » program evaluation technique. This technique is used to assign responsibilities for individual assignments to time assignments, and to keep the overall program on schedule. The stratigraphy of East Wilmington complicates all engineering functions associated with recovery methods and reservoir evaluation. At least 5 major faults are anticipated.« less
43 CFR 10005.18 - Project solicitation procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... anticipated need for NEPA documentation and compliance with the ESA, the Clean Water Act, and other applicable... Section 301 of the Act, the Commission will make a formal invitation to Federal and State resource agencies, Indian tribes, and other interested parties to prepare recommendations concerning projects that...
43 CFR 10005.18 - Project solicitation procedures.
Code of Federal Regulations, 2014 CFR
2014-10-01
... anticipated need for NEPA documentation and compliance with the ESA, the Clean Water Act, and other applicable... Section 301 of the Act, the Commission will make a formal invitation to Federal and State resource agencies, Indian tribes, and other interested parties to prepare recommendations concerning projects that...
43 CFR 10005.18 - Project solicitation procedures.
Code of Federal Regulations, 2012 CFR
2012-10-01
... anticipated need for NEPA documentation and compliance with the ESA, the Clean Water Act, and other applicable... Section 301 of the Act, the Commission will make a formal invitation to Federal and State resource agencies, Indian tribes, and other interested parties to prepare recommendations concerning projects that...
43 CFR 10005.18 - Project solicitation procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... anticipated need for NEPA documentation and compliance with the ESA, the Clean Water Act, and other applicable... Section 301 of the Act, the Commission will make a formal invitation to Federal and State resource agencies, Indian tribes, and other interested parties to prepare recommendations concerning projects that...
An Rx for 20/20 Vision: Vision Planning and Education.
ERIC Educational Resources Information Center
Chrisman, Gerald J.; Holliday, Clifford R.
1996-01-01
Discusses the Dallas Independent School District's decision to adopt an integrated technology infrastructure and the importance of vision planning for long term goals. Outlines the vision planning process: first draft; environmental projection; restatement of vision in terms of market projections, anticipated customer needs, suspected competitor…
76 FR 48165 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-08
... Management and Budget, Paperwork Reduction Project, Fax: 202-395- 7285, E-mail: [email protected] Description: The ORR-1, Cash and Medical Assistance (CMA) Program Estimates, is the application for grants... this program, estimates of the projected costs they anticipate incurring in providing cash and medical...
Simulations of Low Power DIII-D Helicon Antenna Coupling
NASA Astrophysics Data System (ADS)
Smithe, David; Jenkins, Thomas
2017-10-01
We present an overview and initial progress for a new project to model coupling of the DIII-D Helicon Antenna. We lay the necessary computational groundwork for the modeling of both low-power and high power helicon antenna operation, by constructing numerical representations for both the antenna hardware and the DIII-D plasma. CAD files containing the detailed geometry of the low power antenna hardware are imported into the VSim software's FDTD plasma model. The plasma can be represented numerically by importing EQDSK or EFIT files. In addition, approximate analytic forms for the ensuing profiles and fields are constructed to facilitate parameter scans in the various regimes of anticipated antenna operation. To verify the accuracy of the numerical plasma and antenna representations, we will then run baseline simulations of low-power antenna operation, and verify that the predictions for loading, linear coupling, and mode partitioning (i.e. into helicon and slow modes) are consistent with the measurements from the low power helicon antenna experimental campaign, as well as with other independent models. Progress on these baseline simulations will be presented, and any inconsistencies and issues that arise during this process will be identified. Support provided by DOE Grant DE-SC0017843.
ERIC Educational Resources Information Center
Scanlon, William J.
The General Accounting Office examined existing and anticipated concerns related to the recruitment and retention of nurse and nurses aides. Special attention was paid to the following aspects of the problem: (1) factors contributing to the current and anticipated shortage among nurses; (2) what is known about the current and projected supply of…
Lewis, Cara C; Stanick, Cameo F; Martinez, Ruben G; Weiner, Bryan J; Kim, Mimi; Barwick, Melanie; Comtois, Katherine A
2015-01-08
Identification of psychometrically strong instruments for the field of implementation science is a high priority underscored in a recent National Institutes of Health working meeting (October 2013). Existing instrument reviews are limited in scope, methods, and findings. The Society for Implementation Research Collaboration Instrument Review Project's objectives address these limitations by identifying and applying a unique methodology to conduct a systematic and comprehensive review of quantitative instruments assessing constructs delineated in two of the field's most widely used frameworks, adopt a systematic search process (using standard search strings), and engage an international team of experts to assess the full range of psychometric criteria (reliability, construct and criterion validity). Although this work focuses on implementation of psychosocial interventions in mental health and health-care settings, the methodology and results will likely be useful across a broad spectrum of settings. This effort has culminated in a centralized online open-access repository of instruments depicting graphical head-to-head comparisons of their psychometric properties. This article describes the methodology and preliminary outcomes. The seven stages of the review, synthesis, and evaluation methodology include (1) setting the scope for the review, (2) identifying frameworks to organize and complete the review, (3) generating a search protocol for the literature review of constructs, (4) literature review of specific instruments, (5) development of an evidence-based assessment rating criteria, (6) data extraction and rating instrument quality by a task force of implementation experts to inform knowledge synthesis, and (7) the creation of a website repository. To date, this multi-faceted and collaborative search and synthesis methodology has identified over 420 instruments related to 34 constructs (total 48 including subconstructs) that are relevant to implementation science. Despite numerous constructs having greater than 20 available instruments, which implies saturation, preliminary results suggest that few instruments stem from gold standard development procedures. We anticipate identifying few high-quality, psychometrically sound instruments once our evidence-based assessment rating criteria have been applied. The results of this methodology may enhance the rigor of implementation science evaluations by systematically facilitating access to psychometrically validated instruments and identifying where further instrument development is needed.
Recovery Act: Brea California Combined Cycle Electric Generating Plant Fueled by Waste Landfill Gas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Galowitz, Stephen
The primary objective of the Project was to maximize the productive use of the substantial quantities of waste landfill gas generated and collected at the Olinda Landfill near Brea, California. An extensive analysis was conducted and it was determined that utilization of the waste gas for power generation in a combustion turbine combined cycle facility was the highest and best use. The resulting Project reflected a cost effective balance of the following specific sub-objectives: • Meeting the environmental and regulatory requirements, particularly the compliance obligations imposed on the landfill to collect, process and destroy landfill gas • Utilizing proven andmore » reliable technology and equipment • Maximizing electrical efficiency • Maximizing electric generating capacity, consistent with the anticipated quantities of landfill gas generated and collected at the Olinda Landfill • Maximizing equipment uptime • Minimizing water consumption • Minimizing post-combustion emissions • The Project produced and will produce a myriad of beneficial impacts. o The Project created 360 FTE construction and manufacturing jobs and 15 FTE permanent jobs associated with the operation and maintenance of the plant and equipment. o By combining state-of-the-art gas clean up systems with post combustion emissions control systems, the Project established new national standards for best available control technology (BACT). o The Project will annually produce 280,320 MWh’s of clean energy o By destroying the methane in the landfill gas, the Project will generate CO2 equivalent reductions of 164,938 tons annually. The completed facility produces 27.4 MWnet and operates 24 hours a day, seven days a week.« less
Recognizing Risk-of-Failure in Communication Design Projects
ERIC Educational Resources Information Center
Yee, Joyce; Lievesley, Matthew; Taylor, Louise
2009-01-01
The pace of commercial graphic design practice presents very few opportunities to conduct user research after a project's launch. This makes the design team's ability to anticipate and address risks during the design development phase even more important, recognized in the astute observation from Tim Brown, CEO of leading international design…
10 CFR 605.19 - Continuation funding and reporting requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Section 605.19 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS THE OFFICE OF ENERGY... continuation progress report when a change to anticipated future costs will exceed 25 percent of the original... recipient shall periodically report to DOE on the project's progress in meeting the project objectives of...
10 CFR 605.19 - Continuation funding and reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Section 605.19 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS THE OFFICE OF ENERGY... continuation progress report when a change to anticipated future costs will exceed 25 percent of the original... recipient shall periodically report to DOE on the project's progress in meeting the project objectives of...
10 CFR 605.19 - Continuation funding and reporting requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Section 605.19 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS THE OFFICE OF ENERGY... continuation progress report when a change to anticipated future costs will exceed 25 percent of the original... recipient shall periodically report to DOE on the project's progress in meeting the project objectives of...
10 CFR 605.19 - Continuation funding and reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Section 605.19 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS THE OFFICE OF ENERGY... continuation progress report when a change to anticipated future costs will exceed 25 percent of the original... recipient shall periodically report to DOE on the project's progress in meeting the project objectives of...
10 CFR 605.19 - Continuation funding and reporting requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Section 605.19 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS THE OFFICE OF ENERGY... continuation progress report when a change to anticipated future costs will exceed 25 percent of the original... recipient shall periodically report to DOE on the project's progress in meeting the project objectives of...
Promoting "Social and Emotional Learning" through Service-Learning Art Projects
ERIC Educational Resources Information Center
Russell, Robert L.; Hutzel, Karen
2007-01-01
This article intends to encourage teachers to explore ways "social and emotional learning" (SEL) and art education can enhance each other. Service-learning art projects were presented as one example, employing collaborate-and-create, asset-based methods integrated with SEL instruction. Advantages anticipated from combining these methods result…
Anticipatory Cognitive Systems: a Theoretical Model
NASA Astrophysics Data System (ADS)
Terenzi, Graziano
This paper deals with the problem of understanding anticipation in biological and cognitive systems. It is argued that a physical theory can be considered as biologically plausible only if it incorporates the ability to describe systems which exhibit anticipatory behaviors. The paper introduces a cognitive level description of anticipation and provides a simple theoretical characterization of anticipatory systems on this level. Specifically, a simple model of a formal anticipatory neuron and a model (i.e. the τ-mirror architecture) of an anticipatory neural network which is based on the former are introduced and discussed. The basic feature of this architecture is that a part of the network learns to represent the behavior of the other part over time, thus constructing an implicit model of its own functioning. As a consequence, the network is capable of self-representation; anticipation, on a oscopic level, is nothing but a consequence of anticipation on a microscopic level. Some learning algorithms are also discussed together with related experimental tasks and possible integrations. The outcome of the paper is a formal characterization of anticipation in cognitive systems which aims at being incorporated in a comprehensive and more general physical theory.
Subgrade variability on the Ohio SHRP test road
DOT National Transportation Integrated Search
1999-01-01
This paper documents the extent to which subgrade uniformity was achieved on the Ohio SHRP test road. As construction proceeded, considerably more subgrade undercutting was required than originally anticipated. Much of the undercutting was due to the...
Rational's experience using Ada for very large systems
NASA Technical Reports Server (NTRS)
Archer, James E., Jr.; Devlin, Michael T.
1986-01-01
The experience using the Rational Environment has confirmed the advantages forseen when the project was started. Interactive syntatic and semantic information makes a tremendous difference in the ease of constructing programs and making changes to them. The ability to follow semantic references makes it easier to understand exisiting programs and the impact of changes. The integrated debugger makes it much easier to find bugs and test fixes quickly. Taken together, these facilites have helped greatly in reducing the impact of ongoing maintenance of the ability to produce a new code. Similar improvements are anticipated as the same level of integration and interactivity are achieved for configuration management and version control. The environment has also proven useful in introducing personnel to the project and existing personnel to new parts of the system. Personnel benefit from the assistance with syntax and semantics; everyone benefits from the ability to traverse and understand the structure of unfamiliar software. It is often possible for someone completely unfamiliar with a body of code to use these facilities, to understand it well enough to successfully with a body of code to use these facilities to understand it well enough to successfully diagnose and fix bugs in a matter of minutes.
Environmental Assessment for Construction of Base Training Area, Schriever Air Force Base, Colorado
2010-12-01
FONSI) based upon the results of the Environmental Assessment (EA) to evaluate environmental issues and potential impacts associated with a proposal...SIGNIFICANT IMPACT (FONSI) FOR CONSTRUCTION OF BASE TRAINING AREA, SCHRIEVER AIR FORCE BASE, COLORADO An Environmental Assessment (EA) was...Proposed Action has the potential to result in adverse environmental impacts ; however, no significant impacts are anticipated as noted in Table 1 which
Code of Federal Regulations, 2010 CFR
2010-10-01
.... (a) A blanket purchase agreement (BPA) is a simplified method of filling anticipated repetitive needs..., projects, or functions. Such organizations, for example, may be organized supply points, separate...
Maximizing investments in work zone safety in Oregon : final report.
DOT National Transportation Integrated Search
2011-05-01
Due to the federal stimulus program and the 2009 Jobs and Transportation Act, the Oregon Department of Transportation (ODOT) anticipates that a large increase in highway construction will occur. There is the expectation that, since transportation saf...
Alternative Energy Curriculum for Trade and Industry Exploratory. Final Report.
ERIC Educational Resources Information Center
University of Central Arkansas, Conway.
This study was a descriptive curriculum research project covering the development of learning packets on alternative energy. The purpose of the project was to improve instruction in trades and industry exploratory programs by providing alternative energy materials. It was anticipated that the use of a prepared learning package would facilitate the…
75 FR 70670 - Final Vehicle Safety Rulemaking and Research Priority Plan 2010-2013
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-18
... management tool as well as a means to communicate to the public NHTSA's highest priorities to meet the Nation's motor vehicle safety challenges. Among them are programs and projects involving rollover crashes... in this plan. This plan lists the programs and projects the agency anticipates working on even though...
Anticipating Stimulus Money for Campus Projects, Colleges Get "Shovel Ready"
ERIC Educational Resources Information Center
Carlson, Scott
2009-01-01
Help for colleges may be on the way in the $825-billion stimulus package being pressed by Congressional leaders. The bill that House Democrats introduced this month includes $7-billion for higher-education modernization, renovation, and repair that could kick-start projects like upgrading heating and cooling systems, fixing roofs, and doing…
40 CFR Appendix A to Subpart L - Criteria for Evaluating a State's Proposed NEPA-Like Process
Code of Federal Regulations, 2012 CFR
2012-07-01
... consider: (1) Designation of a study area comparable to the final system; (2) A range of feasible... conditions; (5) Land use and other social parameters including relevant recreation and open-space..., institutional, and industrial) within the project study area; and (8) Other anticipated public works projects...
40 CFR Appendix A to Subpart L - Criteria for Evaluating a State's Proposed NEPA-Like Process
Code of Federal Regulations, 2010 CFR
2010-07-01
... consider: (1) Designation of a study area comparable to the final system; (2) A range of feasible... conditions; (5) Land use and other social parameters including relevant recreation and open-space..., institutional, and industrial) within the project study area; and (8) Other anticipated public works projects...
40 CFR Appendix A to Subpart L - Criteria for Evaluating a State's Proposed NEPA-Like Process
Code of Federal Regulations, 2011 CFR
2011-07-01
... consider: (1) Designation of a study area comparable to the final system; (2) A range of feasible... conditions; (5) Land use and other social parameters including relevant recreation and open-space..., institutional, and industrial) within the project study area; and (8) Other anticipated public works projects...
Let's Prepare--Not Repair--Our At Risk Students.
ERIC Educational Resources Information Center
Merrell, Jean Groves
Project Earlybird assists at-risk students to anticipate the upcoming classwork and be ready for the lessons when the teacher presents them. The project is a before/after school program in which elementary students in grades 2 through 5 are given extra help with reading, mainly using computers. Elements of the program include: (1) raising…
43 CFR 426.6 - Leasing and full-cost pricing.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) deficits funded. O&M deficits funded are the annual O&M costs including project-use pumping power allocated... payments due the United States. (6) In determining full-cost charges, the following factors will be... of the contract, whichever is later, to the anticipated date of project repayment; and (D) In cases...
Empowering the Rural Adult Learner: Problems and Strategies.
ERIC Educational Resources Information Center
Kovel-Jarboe, Patricia
This paper summarizes the 16 projects that have been funded by the Minnesota Extension Service to demonstrate innovative and effective uses of technology in adult education. Several of the projects are described in detail. Actual and anticipated impacts are examined, and suggested strategies that others can apply to reach and empower rural adult…
The Complexities of Community-Based Websites
ERIC Educational Resources Information Center
Bomberger, Ann; Homan, Michelle
2015-01-01
This article describes the development and ongoing operations of the GreenEriePA.org project, a portal to all things environmental in Erie County, PA. Through regular input from community partners, GreenEriePA turned into a much larger, long-term project than the faculty coordinators at Gannon University, Erie, PA, originally anticipated. We…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
....dmlcompetition.net/Competition/4/badges-projects.php?id=2667 . VA does not anticipate that it will issue badges... lean Six Sigma. Law Enforcement, which may include specialties such as criminal investigation and... alternative fuels. Information Technology, including all phases of software development and IT project...
Fighting Fires in Early Intervention Supervision: Trading the Axe for Mr. Rogers's Slippers
ERIC Educational Resources Information Center
Alexander, Laura; Gallen, Robert T.; Salazar, Ruby; Shahmoon-Shanok, Rebecca
2012-01-01
When Pennsylvania's Early Intervention system implemented an early intervention-reflective supervision project, modest expectations for change were anticipated, given the limited amount of time and funding for the project. In this article, one participant tells the story of her professional development, which enabled her to augment her skills as…
'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adonizio, Mary Ann; Corren, Dean; Smith, Ron
Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.
ERIC Educational Resources Information Center
Westerman, William
This project began when the Philadelphia Folklore Project (PFP) initiated a residency partnership with the Samuel S. Fleisher Art Memorial in traditional Cambodian arts. The PFP anticipated raising issues that might help in the understanding of the cultural dynamics and elements that were likely to shape and effect the residency. The PFP imagined…
Acquisition forecast: Fiscal year 1995
NASA Technical Reports Server (NTRS)
1995-01-01
This volume includes projections of all anticipated FY95, and beyond, NASA contract actions above $25,000 that small and small disadvantaged businesses may be able to perform under direct contract with the government or as subcontractors. The forecast consolidates anticipated procurements at each NASA center into an agencywide report, with the aim of increasing industries' advance knowledge of NASA requirements and enhancing competition in contracting. Each center forecast report is divided into three principal categories of procurement: research and development, services, and supplies and equipment.
Scientific, Social, and Institutional Constraints Facing Coastal Restoration in Louisiana
NASA Astrophysics Data System (ADS)
Kleiss, B.; Shabman, L. A.; Brown, G.
2017-12-01
Due to multiple stressors, including subsidence, accelerated sea level rise, canal construction, tropical storm damages, and basin-wide river management decisions, southern Louisiana is experiencing some of the world's highest rates of coastal land loss. Although ideas abound, the solutions proposed to mitigate for land loss are often uncertain, complex, expensive, and difficult. There are significant scientific uncertainties associated with fundamental processes including the spatial distribution of rates of subsidence, the anticipated impacts of increased inundation on marsh plant species and questions about the resilience of engineered solutions. Socially and politically, there is the need to balance navigation, flood risk management and environmental restoration with the fact that the land involved is largely privately owned and includes many communities and towns. And layered within this, there are federal and state regulatory constraints which seek to follow a myriad of existing State and Federal laws, protect the benefits realized from previous federal investments, and balance the conflicting interests of a large number of stakeholders. Additionally, current practice when implementing some environmental regulations is to assess impacts against the baseline of current conditions, not projected future, non-project conditions, making it difficult to receive a permit for projects which may have a short-term detriment, but hope for a long-term benefit. The resolution (or lack thereof) of these issues will serve to inform similar future struggles in other low lying coastal areas around the globe.
Construction of fuzzy spaces and their applications to matrix models
NASA Astrophysics Data System (ADS)
Abe, Yasuhiro
Quantization of spacetime by means of finite dimensional matrices is the basic idea of fuzzy spaces. There remains an issue of quantizing time, however, the idea is simple and it provides an interesting interplay of various ideas in mathematics and physics. Shedding some light on such an interplay is the main theme of this dissertation. The dissertation roughly separates into two parts. In the first part, we consider rather mathematical aspects of fuzzy spaces, namely, their construction. We begin with a review of construction of fuzzy complex projective spaces CP k (k = 1, 2, · · ·) in relation to geometric quantization. This construction facilitates defining symbols and star products on fuzzy CPk. Algebraic construction of fuzzy CPk is also discussed. We then present construction of fuzzy S 4, utilizing the fact that CP3 is an S2 bundle over S4. Fuzzy S4 is obtained by imposing an additional algebraic constraint on fuzzy CP3. Consequently it is proposed that coordinates on fuzzy S4 are described by certain block-diagonal matrices. It is also found that fuzzy S8 can analogously be constructed. In the second part of this dissertation, we consider applications of fuzzy spaces to physics. We first consider theories of gravity on fuzzy spaces, anticipating that they may offer a novel way of regularizing spacetime dynamics. We obtain actions for gravity on fuzzy S2 and on fuzzy CP3 in terms of finite dimensional matrices. Application to M(atrix) theory is also discussed. With an introduction of extra potentials to the theory, we show that it also has new brane solutions whose transverse directions are described by fuzzy S 4 and fuzzy CP3. The extra potentials can be considered as fuzzy versions of differential forms or fluxes, which enable us to discuss compactification models of M(atrix) theory. In particular, compactification down to fuzzy S4 is discussed and a realistic matrix model of M-theory in four-dimensions is proposed.
New Regulations Affect School Debt Financing.
ERIC Educational Resources Information Center
Olson, Carol Duane
1993-01-01
Provides an overview of changes in Treasury Regulations as they affect school debt financing, including bond and note construction and acquisition issues, other types of equipment and property financing, as well as tax and revenue anticipation notes for working capital needs. (MLF)
The Self-Stigma Process in Criminal Offenders
Moore, Kelly E.; Tangney, June P.; Stuewig, Jeffrey B.
2016-01-01
Upon conviction, individuals receive the stigmatizing label “criminal offender.” Existing stereotypes about criminal offenders may be integrated into the self-concept, a phenomenon known as self-stigma. In many stigmatized groups, self-stigma is a robust predictor of poor functioning (Livingston & Boyd, 2010; Schomerus et al., 2011). However, little is known about how self-stigma occurs (Corrigan et al., 2006), and there has been limited research with criminal offenders. This study examines a theoretical model of self-stigma in which perceived stigma leads to stereotype agreement, internalized stigma, and then to anticipated stigma. A sample of 203 male jail inmates completed assessments of these constructs just prior to release. Results show a significant indirect path from perceived stigma to stereotype agreement to internalized stigma, but not to anticipated stigma. However, perceived stigma was directly related to anticipated stigma. In conclusion, perceived stigma affects the self through two processes: it indirectly leads to internalized stigma through one avenue, and directly leads to anticipated stigma through a separate avenue. Race, criminal identity, and attitudes toward criminals were examined as moderators. PMID:27761521
18 CFR 12.41 - Monitoring instruments.
Code of Federal Regulations, 2014 CFR
2014-04-01
... instrumentation whenever any physical condition that might affect the stability of a project structure has been discovered or is anticipated. The instrumentation must be satisfactory to the Regional Engineer and may...
18 CFR 12.41 - Monitoring instruments.
Code of Federal Regulations, 2013 CFR
2013-04-01
... instrumentation whenever any physical condition that might affect the stability of a project structure has been discovered or is anticipated. The instrumentation must be satisfactory to the Regional Engineer and may...
18 CFR 12.41 - Monitoring instruments.
Code of Federal Regulations, 2012 CFR
2012-04-01
... instrumentation whenever any physical condition that might affect the stability of a project structure has been discovered or is anticipated. The instrumentation must be satisfactory to the Regional Engineer and may...
32 CFR 651.36 - Public involvement.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Magnitude of the proposed project/action. (2) Extent of anticipated public interest, based on experience... and documentation process. Open communication with the public is encouraged as a matter of Army policy...
32 CFR 651.36 - Public involvement.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Magnitude of the proposed project/action. (2) Extent of anticipated public interest, based on experience... and documentation process. Open communication with the public is encouraged as a matter of Army policy...
32 CFR 651.36 - Public involvement.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Magnitude of the proposed project/action. (2) Extent of anticipated public interest, based on experience... and documentation process. Open communication with the public is encouraged as a matter of Army policy...
32 CFR 651.36 - Public involvement.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Magnitude of the proposed project/action. (2) Extent of anticipated public interest, based on experience... and documentation process. Open communication with the public is encouraged as a matter of Army policy...
NASA Technical Reports Server (NTRS)
Hooke, A. J.
2000-01-01
Architectural design of the interplanetary internet is now underway and prototype flight testing of some of the candidate protocols is anticipated within a year. This talk will describe the current status of the project.
Arizona transportation history.
DOT National Transportation Integrated Search
2011-12-01
The Arizona transportation history project was conceived in anticipation of Arizonas centennial, which will be : celebrated in 2012. Following approval of the Arizona Centennial Plan in 2007, the Arizona Department of : Transportation (ADOT) recog...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Woodruff, Dana L.; Southard, Susan S.; Cullinan, Valerie I.
2007-02-01
King County proposes to build a new sewer outfall discharging to Puget Sound near Point Wells, Washington. Construction is scheduled for 2008. The Point Wells site was selected to minimize effects on the nearshore marine environment, but unavoidable impacts to eelgrass (Zostera marina) beds are anticipated during construction. To mitigate for these impacts and prepare for post-construction restoration, King County began implementation of a multi-year eelgrass monitoring and restoration program in 2004, with the primary goal of returning intertidal and shallow subtidal habitat and eelgrass to pre-construction conditions. Major program elements are a) pre-construction monitoring, i.e., documenting initial eelgrass conditionsmore » and degree of fluctuation over 5 years prior to construction, b) eelgrass transplanting, including harvesting, offsite propagating and stockpiling of local plantstock, and post-construction planting, and c) post-construction monitoring. The program is detailed in the Eelgrass Restoration and Biological Resources Implementation Workplan (King County 2006). This report describes calendar year 2006 pre-construction activities conducted by Pacific Northwest National Laboratory (PNNL) in support of King County. Activities included continued propagation of eelgrass shoots and monitoring of the experimental harvest plots in the marine outfall corridor area to evaluate recovery rates relative to harvest rates. Approximately 1500 additional shoots were harvested from the marine outfall corridor in August 2006 to supplement the plants in the propagation tank at the PNNL Marine Sciences Laboratory in Sequim, Washington, bringing the total number of shoots to 4732. Eelgrass densities were monitored in the five experimental harvest plots established in the marine outfall corridor. Changes in eelgrass density were evaluated in year-to-year comparisons with initial harvest rates. Net eelgrass density decreased from 2004 post-harvest to 2006 in all plots, despite density increases observed in 2005 in some plots and at some harvest rates. Eelgrass densities within individual subplots were highly variable from year to year, and the change in density in any interannual period did not correlate to the initial 2004 harvest rate. Continued monitoring should help project managers determine an optimum harvest rate that supports rapid recovery of donor eelgrass beds.« less
Anticipated synchronization in neuronal circuits unveiled by a phase-response-curve analysis
NASA Astrophysics Data System (ADS)
Matias, Fernanda S.; Carelli, Pedro V.; Mirasso, Claudio R.; Copelli, Mauro
2017-05-01
Anticipated synchronization (AS) is a counterintuitive behavior that has been observed in several systems. When AS occurs in a sender-receiver configuration, the latter can predict the future dynamics of the former for certain parameter values. In particular, in neuroscience AS was proposed to explain the apparent discrepancy between information flow and time lag in the cortical activity recorded in monkeys. Despite its success, a clear understanding of the mechanisms yielding AS in neuronal circuits is still missing. Here we use the well-known phase-response-curve (PRC) approach to study the prototypical sender-receiver-interneuron neuronal motif. Our aim is to better understand how the transitions between delayed to anticipated synchronization and anticipated synchronization to phase-drift regimes occur. We construct a map based on the PRC method to predict the phase-locking regimes and their stability. We find that a PRC function of two variables, accounting simultaneously for the inputs from sender and interneuron into the receiver, is essential to reproduce the numerical results obtained using a Hodgkin-Huxley model for the neurons. On the contrary, the typical approximation that considers a sum of two independent single-variable PRCs fails for intermediate to high values of the inhibitory coupling strength of the interneuron. In particular, it loses the delayed-synchronization to anticipated-synchronization transition.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-04
... Environmental Impact Statement (SEIS) for PacRim Coal's Proposed Chuitna Coal Project AGENCY: U.S. Army Corps of... Chuitna Coal Project. It is anticipated that the Environmental Protection Agency (EPA), the Native Village... the Alaska Surface Coal Mining Control and Reclamation Act (ASCMCRA) permit, which governs all aspects...
ERIC Educational Resources Information Center
Stevenson, Wayne
This report provides projections of the employment of scientists, engineers, technicians, and other occupations for the civilian nuclear industry through the year 2000. Low, medium, and high projections are provided. In all cases, a substantial number of job openings are anticipated to fill needs created by employment growth, retirement, death,…
Michael J. Furniss; Ken B. Roby; Dan Cenderelli; John Chatel; Caty F. Clifton; Alan Clingenpeel; Polly E. Hays; Dale Higgins; Ken Hodges; Carol Howe; Laura Jungst; Joan Louie; Christine Mai; Ralph Martinez; Kerry Overton; Brian P. Staab; Rory Steinke; Mark Weinhold
2013-01-01
Existing models and predictions project serious changes to worldwide hydrologic processes as a result of global climate change. Projections indicate that significant change may threaten National Forest System watersheds that are an important source of water used to support people, economies, and ecosystems.Wildland managers are expected to anticipate and...
ERIC Educational Resources Information Center
Anderson, G. Ernest, Jr.
The mission of the simulation team of the Model Elementary Teacher Education Project, 1968-71, was to develop simulation tools and conduct appropriate studies of the anticipated operation of that project. The team focused on the experiences of individual students and on the resources necessary for these experiences to be reasonable. This report…
ERIC Educational Resources Information Center
Salley, Charles D.
Accurate enrollment forecasts are a prerequisite for reliable budget projections. This is because tuition payments make up a significant portion of a university's revenue, and anticipated revenue is the immediate constraint on current operating expenditures. Accurate forecasts are even more critical to revenue projections when a university's…
The influence of age-specific migration on housing growth in the rural Midwest (USA)
Yohan Lee; Claire A. Montgomery; Jeff Kline
2016-01-01
Natural resource policymakers and planners increasingly rely on regional and national-level spatial data describing projections of future housing growth, to anticipate development impacts on natural resources and identify policy and planning needs. Such projections have not always been well-grounded in demographic and other factors that influence population and thus...
National Synchrotron Light Source 2010 Activity Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rowe, M.; Snyder, K. J.
This is a very exciting period for photon sciences at Brookhaven National Laboratory. It is also a time of unprecedented growth for the Photon Sciences Directorate, which operates the National Synchrotron Light Source (NSLS) and is constructing NSLS-II, both funded by the Department of Energy's Office of Science. Reflecting the quick pace of our activities, we chose the theme 'Discovery at Light Speed' for the directorate's 2010 annual report, a fiscal year bookended by October 2009 and September 2010. The year began with the news that NSLS users Venki Ramakrishnan of Cambridge University (also a former employee in Brookhaven's biologymore » department) and Thomas A. Steitz of Yale University were sharing the 2009 Nobel Prize in Chemistry with Ada E. Yonath of the Weizmann Institute of Science. Every research project has the potential for accolades. In 2010, NSLS users and staff published close to 900 papers, with about 170 appearing in premiere journals. Those are impressive stats for a facility nearly three decades old, testament to the highly dedicated team keeping NSLS at peak performance and the high quality of its user community. Our NSLS users come from a worldwide community of scientists using photons, or light, to carry out research in energy and environmental sciences, physics, materials science, chemistry, biology and medicine. All are looking forward to the new capabilities enabled by NSLS-II, which will offer unprecedented resolution at the nanoscale. The new facility will produce x-rays more than 10,000 times brighter than the current NSLS and host a suite of sophisticated instruments for cutting-edge science. Some of the scientific discoveries we anticipate at NSLS-II will lead to major advances in alternative energy technologies, such as hydrogen and solar. These discoveries could pave the way to: (1) catalysts that split water with sunlight for hydrogen production; (2) materials that can reversibly store large quantities of electricity or hydrogen; (3) high-temperature superconducting materials that carry electricity with no loss for efficient power transmission lines; and (4) materials for solid-state lighting with half of the present power consumption. Excitement about NSLS-II is evident in many ways, most notably the extraordinary response we had to the 2010 call for beamline development proposals for the anticipated 60 or more beamlines that NSLS-II will ultimately host. A total of 54 proposals were submitted and, after extensive review, 34 were approved. Funding from both the Department of Energy and the National Institutes of Health has already been secured to support the design and construction of a number of these beamlines. FY11 is a challenging and exciting year for the NSLS-II Project as we reach the peak of our construction activity. We remain on track to complete the project by March 2014, a full 15 months ahead of schedule and with even more capabilities than originally planned. The Photon Sciences Directorate is well on its way to fulfilling our vision of being a provider of choice for world-class photon sciences and facilities.« less
7 CFR 1209.50 - Budget and expenses.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., or project; (ii) A summary of anticipated revenue, with comparative data for at least one preceding... administrative expense breakdowns, with comparative data for at least one preceding year. Each budget shall...
7 CFR 1209.50 - Budget and expenses.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., or project; (ii) A summary of anticipated revenue, with comparative data for at least one preceding... administrative expense breakdowns, with comparative data for at least one preceding year. Each budget shall...
7 CFR 1209.50 - Budget and expenses.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., or project; (ii) A summary of anticipated revenue, with comparative data for at least one preceding... administrative expense breakdowns, with comparative data for at least one preceding year. Each budget shall...
7 CFR 1209.50 - Budget and expenses.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., or project; (ii) A summary of anticipated revenue, with comparative data for at least one preceding... administrative expense breakdowns, with comparative data for at least one preceding year. Each budget shall...
7 CFR 1209.50 - Budget and expenses.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., or project; (ii) A summary of anticipated revenue, with comparative data for at least one preceding... administrative expense breakdowns, with comparative data for at least one preceding year. Each budget shall...
Dream Incubation: A Reconstruction of Ritual in Contemporary Form
ERIC Educational Resources Information Center
Reed, Henry
1976-01-01
Dream incubation is the ritual of going to sleep in a sacred place in anticipation of receiving a helpful dream from a divine benefactor. Drawing upon a variety of contemporary psychotherapeutic principles and procedures, author constructed an experimental ritual of incubation. (Editor)
Safety and Automated Train Control for Rail Rapid Transit Systems
DOT National Transportation Integrated Search
1974-07-01
The anticipated construction and expansion of rail rapid transit system in the United States over the next 10-15 years implies major capital expenditures. A significant level of automation in train cntrol is likely to be central to these systems. The...
Larry W. van Tassell; E. Tom Bartlett; John E. Mitchell
2001-01-01
Scenario analysis techniques were used to combine projections from 35 grazed forage experts to estimate future forage demand scenarios and examine factors that are anticipated to impact the use of grazed forages in the South, North, and West Regions of the United States. The amount of land available for forage production is projected to decrease in all regions while...
Bradley, Kailyn A L; Case, Julia A C; Freed, Rachel D; Stern, Emily R; Gabbay, Vilma
2017-07-01
There has been growing interest under the Research Domain Criteria initiative to investigate behavioral constructs and their underlying neural circuitry. Abnormalities in reward processes are salient across psychiatric conditions and may precede future psychopathology in youth. However, the neural circuitry underlying such deficits has not been well defined. Therefore, in this pilot, we studied youth with diverse psychiatric symptoms and examined the neural underpinnings of reward anticipation, attainment, and positive prediction error (PPE, unexpected reward gain). Clinically, we focused on anhedonia, known to reflect deficits in reward function. Twenty-two psychotropic medication-free youth, 16 with psychiatric symptoms, exhibiting a full range of anhedonia, were scanned during the Reward Flanker Task. Anhedonia severity was quantified using the Snaith-Hamilton Pleasure Scale. Functional magnetic resonance imaging analyses were false discovery rate corrected for multiple comparisons. Anticipation activated a broad network, including the medial frontal cortex and ventral striatum, while attainment activated memory and emotion-related regions such as the hippocampus and parahippocampal gyrus, but not the ventral striatum. PPE activated a right-dominant fronto-temporo-parietal network. Anhedonia was only correlated with activation of the right angular gyrus during anticipation and the left precuneus during PPE at an uncorrected threshold. Findings are preliminary due to the small sample size. This pilot characterized the neural circuitry underlying different aspects of reward processing in youth with diverse psychiatric symptoms. These results highlight the complexity of the neural circuitry underlying reward anticipation, attainment, and PPE. Furthermore, this study underscores the importance of RDoC research in youth. Copyright © 2016 Elsevier B.V. All rights reserved.
Ultra-High-Performance Concrete And Advanced Manufacturing Methods For Modular Construction
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sawab, Jamshaid; Lim, Ing; Mo, Yi-Lung
Small modular reactors (SMR) allow for less onsite construction, increase nuclear material security, and provide a flexible and cost-effective energy alternative. SMR can be factory-built as modular components, and shipped to desired locations for fast assembly. This project successfully developed a new class of ultra-high performance concrete (UHPC), which features a compressive strength greater than 22 ksi (150 MPa) without special treatment and self-consolidating characteristics desired for SMR modular construction. With an ultra-high strength and dense microstructure, it will facilitate rapid construction of steel plate-concrete (SC) beams and walls with thinner and lighter modules, and can withstand harsh environments andmore » mechanical loads anticipated during the service life of nuclear power plants. In addition, the self-consolidating characteristics are crucial for the fast construction and assembly of SC modules with reduced labor costs and improved quality. Following the UHPC material development, the capacity of producing self-consolidating UHPC in mass quantities was investigated and compared to accepted self-consolidating concrete standards. With slightly adjusted mixing procedure using large-scale gravity-based mixers (compared with small-scale force-based mixer), the self-consolidating UHPC has been successfully processed at six cubic yards; the product met both minimum compressive strength requirements and self-consolidating concrete standards. Steel plate-UHPC beams (15 ft. long, 12 in. wide and 16 in. deep) and wall panels (40 in. X 40 in. X 3 in.) were then constructed using the self-consolidating UHPC without any external vibration. Quality control guidelines for producing UHPC in large scale were developed. When the concrete is replaced by UHPC in a steel plate concrete (SC) beam, it is critical to evaluate its structural behavior with both flexure and shear-governed failure modes. In recent years, SC has been widely used for buildings and nuclear containment structures to resist lateral forces induced by severe earthquakes and heavy winds. SC modules have good potential for SMR because of their cost-effectiveness and reduced construction time. However, the minimum shear reinforcement (i.e. cross tie) ratio needs to be determined for the steel plate-UHPC (S-UHPC) beams to exhibit a ductile failure mode. In this project, S-UHPC beams were designed and constructed. The beams were tested to evaluate structural capacity and identify the minimum cross ties ratios. In addition, as the bond between UHPC and steel plate is essential for ensuring structural integrity under shear and flexure, it was measured and examined in this project through digital image correlation system and smart piezoelectric aggregate sensors. Large-scale testing and finite element simulation were also performed on S-UHPC wall panels. New bond slip-based constitutive models of steel plate were developed for S-UHPC, which were used in finite element analysis program to predict S-UHPC behavior under shear. The results were well validated through experimental data. The long-term durability of UHPC were established in this project. UHPC specimens were tested under free shrinkage, restrained shrinkage, elevated temperature, water permeation, chloride diffusion, corrosion, and alkali silica reaction. UHPC has demonstrated significantly improved durability compared with control concrete specimens. This research led to a new generation of steel plate-UHPC modules for SMR that can provide large benefits to the electric power industry. Taking advantage of the high strength and durability of UHPC, their modularity and ease of assembly can address the high cost barriers of typical nuclear power plants.« less
Herda, Daniel; McCarthy, Bill
2018-02-01
There is a growing body of evidence linking racial discrimination and juvenile crime, and a number of theories explain this relationship. In this study, we draw on one popular approach, Agnew's general strain theory, and extend prior research by moving from a focus on experienced discrimination to consider two other forms, anticipated and vicarious discrimination. Using data on black, white, and Hispanic youth, from the Project on Human Development in Chicago Neighborhoods (PHDCN), we find that experienced, anticipated, and to a lesser extent, vicarious discrimination, significantly predict violent crime independent of a set of neighborhood, parental, and individual level controls, including prior violent offending. Additional analyses on the specific contexts of discrimination reveal that violence is associated with the anticipation of police discrimination. The effects tend to be larger for African American than Hispanic youth, but the differences are not statistically significant. These findings support the thesis that, like other strains, discrimination may not have to be experienced directly to influence offending. Copyright © 2017. Published by Elsevier Inc.
Tennol, Inc. - loan-guarantee application: Marion County, Tennessee. Environmental assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1982-12-01
Tennol, Inc., is requesting a loan guarantee to build a fuel ethanol plant having an annual capacity of 95,000 m/sup 3/ (25 x 10/sup 6/ gal) in Jasper, Tennessee. The plant will wet-mill corn (255 Gg/year) for feedstock and will burn coal (43 Gg/year) for process heat. Marketable by-products include corn gluten feed (61 Gg/year), corn gluten meal (17 Gg/year), and carbon dioxide (71 Gg/year). Dehydration of the product alcohol will be azeotropic distillation with diethyl ether, and denaturation will be with unleaded gasoline. No degradation of local or regional air quality is anticipated. A combination of wetlands, old fields,more » and bottomland hardwood forest provides excellent wildlife habitat. Over 75% of the site will remain undisturbed, and construction activity will be confined to the northern end of the site. Because no wet areas will be disturbed and all liquid effluent releases will be to the Jasper wastewater treatment plant, no impact on aquatic organisms or water quality is anticipated. Impact to terrestrial organisms will be minor, and no rare or endangered species will be affected. Water will be supplied by the town of Jasper and by onsite wells. Tennol will represent about 3% of total ground water use in Marion County, but no impact is anticipated since the region has abundant groundwater resources. Although both historic and archaeological sites occur on the property, these sites lie outside the area of construction impact. Socioeconomic impact will be positive. Approximately 200 people will be employed at the peak of construction, and practically all are expected to commute. Of the 100 to 120 permanent jobs that will be created, most are expected to go to local people.« less
Tonnon, S C; Proper, K I; van der Ploeg, H P; Westerman, M J; Sijbesma, E; van der Beek, A J
2014-12-23
Lifestyle interventions have proven effective for lowering a cardiovascular risk profile by improving lifestyle behaviors, blood glucose and blood cholesterol levels. However, implementation of lifestyle interventions is often met with barriers. This qualitative study sought to determine anticipated barriers and facilitators to the nationwide implementation of an effective lifestyle intervention in the construction industry in the Netherlands. Prior to implementation, focus groups were held with 8 lifestyle counselors and semi-structured interviews with 20 employees of the construction industry, 4 occupational physicians, 4 medical assistants, and 1 manager of an occupational health service. The transcripts were coded by two coders and analyzed by constant comparison. Hypothetical employee willingness to sign up for the intervention was facilitated by a high level of perceived risk, perceived added value of the intervention, and perceived social support. It was hampered by a preference for independence and perceived interference with their work. All professionals named a lack of time as an anticipated barrier to implementation. Lifestyle counselors suggested several strategies to improve the proficiency of their counseling technique, such as training in small groups and a continuous stream of employee referrals. Occupational physicians thought they would be hampered in screening employees and referring them to a lifestyle counselor by the perception that addressing employee lifestyles was not their task, and by a counter-productive relationship with other stakeholders. The manager addressed financial incentives and a good intervention fit with the current approach of the OHS. The findings suggest that employees can be motivated to sign up for a lifestyle intervention by tailoring the implementation strategy to various subgroups within the target group. Occupational physicians can be motivated to refer employees for the intervention by making a referral personally and professionally rewarding.
Theoretical framework of the causes of construction time and cost overruns
NASA Astrophysics Data System (ADS)
Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.
2017-11-01
Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.
7 CFR 1215.50 - Budget and expenses.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., plan, or project; (3) A summary of anticipated revenue, with comparative data for at least one... administrative expense breakdowns, with comparative data for at least one preceding year. (c) In budgeting plans...
7 CFR 1215.50 - Budget and expenses.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., plan, or project; (3) A summary of anticipated revenue, with comparative data for at least one... administrative expense breakdowns, with comparative data for at least one preceding year. (c) In budgeting plans...
7 CFR 1215.50 - Budget and expenses.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., plan, or project; (3) A summary of anticipated revenue, with comparative data for at least one... administrative expense breakdowns, with comparative data for at least one preceding year. (c) In budgeting plans...
7 CFR 1215.50 - Budget and expenses.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., plan, or project; (3) A summary of anticipated revenue, with comparative data for at least one... administrative expense breakdowns, with comparative data for at least one preceding year. (c) In budgeting plans...
7 CFR 1215.50 - Budget and expenses.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., plan, or project; (3) A summary of anticipated revenue, with comparative data for at least one... administrative expense breakdowns, with comparative data for at least one preceding year. (c) In budgeting plans...
Positive train control shared network.
DOT National Transportation Integrated Search
2015-05-01
The Interoperable Train Control (ITC) Positive : Train Control (PTC) Shared Network (IPSN) : project investigated anticipated industry benefits : and the level of support for the development of : a hosted technological platform for PTC : messaging ac...
42 CFR 137.332 - On what basis may the Secretary reject a final construction project proposal?
Code of Federal Regulations, 2010 CFR
2010-10-01
... face clearly demonstrates that the construction project cannot be completed as proposed. (b) For construction programs proposed to be included in a construction project agreement, the Secretary may also... construction project proposal? 137.332 Section 137.332 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...
Space Construction Experiment Definition Study (SCEDS), part 3. Volume 2: Study results
NASA Technical Reports Server (NTRS)
1983-01-01
The essential controls and dynamics community needs for a large space structures is addressed by the basic Space Construction Experiments (SCE)/MAST configuration and enhanced configurations for follow-on flights. The SCE/MAST can be integrated on a single structures technology experiments platform (STEP). The experiment objectives can be accomplished without the need for EVA and it is anticipated that further design refinements will eliminate the requirement to use the remote manipulator system.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gorlov, A.M.
This report contains conclusive results of the research project entitled ``Further Development of the Pneumatic Method to Harness Hydropower and its Experimental Implementation in the State of Maine`` sponsored by the US Department of Energy (Contract DE-FG02-91ER12113). The results obtained by this research are considerably beyond the original goals anticipated by the contract which were a theoretical study of the method only and its possible applications. In fact, the success of the analytical research program has allowed us to move on to development, construction and testing of a physical model of the hydro-air power converter and, subsequently, to development ofmore » a well equipped hydro-pneumatic power laboratory at Northeastern University. Photographs la and 2a show both the laboratory and the model. Good performance of the model proves that the hydro-pneumatic concept holds much promise for development of an ecologically safe and commercially attractive novel approach to harnessing ultra low-head hydropower. As a result, private companies have started to support this new technology, and to invest money in its further development and construction of demonstration power plants (Appendix 1). Visitors at the Northeastern University laboratory often praise this new technique, as is attested by the articles in the Wall Street Journal (Appendix 2) and the Technology Review (Appendix 3).« less
Low VOC drying of lumber and wood panel products. Progress report number 9
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hooda, U.; Banerjee, S.; Ingram, L.
1998-10-01
This project is based on the finding that brief microwave or RF-treatment of wood under low-headspace conditions leads to the release of VOCs. On occasion the authors have found that prolonged irradiation increases turpentine yield much more than anticipated from a simple mass balance; i.e., more pinene appeared to be released than was present in the wood in the first place. If taken at face value, this suggests that brief low-headspace irradiation removes VOCs, while prolonged exposure creates it. While seemingly improbable, this could follow if dielectric heating exposed regions of wood that were otherwise inaccessible to the solvent usedmore » for extraction (unlikely), or if the irradiation induced depolymerization of terpene dimers or higher polymers. In this report the authors attempt to identify the conditions that lead to this apparent enhancement of terpene yield, by constructing relationships between yield and irradiation parameters. The tentative conclusions are that this enhancement only occurs with relatively wet heartwood, and only under prolonged irradiation. An additional conclusion is that continuing analyses of twelve trees in the MSU forest confirm that the absence of a significant seasonal influence on turpentine content. An apparatus for permeability testing has been constructed, and work is underway.« less
23 CFR 635.411 - Material or product selection.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS... is used for research or for a distinctive type of construction on relatively short sections of road... quality and equally acceptable on the basis of engineering analysis and the anticipated prices for the...
23 CFR 635.411 - Material or product selection.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS... is used for research or for a distinctive type of construction on relatively short sections of road... quality and equally acceptable on the basis of engineering analysis and the anticipated prices for the...
Robinson, Natalie G; Masser, Barbara M; White, Katherine M; Hyde, Melissa K; Terry, Deborah J
2008-12-01
With an increasing demand for blood and blood products in Australia, there is a continual need to recruit blood donors. As such, it is important to investigate the factors that impact on nondonors' decision-making processes with regard to donating blood for the first time. Previous research has established the efficacy of the theory of planned behavior (TPB) in predicting blood donor intentions. The current research aimed to test a TPB model augmented with constructs implicated in previous blood donor research; specifically descriptive norm, moral norm, anticipated regret, and donation anxiety. Participants completed measures assessing the standard TPB variables of attitude, subjective norm, and perceived behavioral control (PBC) as well as descriptive norm, moral norm, donation anxiety, and anticipated regret. Path analysis examined the utility of the augmented TPB model to predict 195 non-blood donors' intentions to donate blood. A final revised model provided a very good fit to the data and included attitude, PBC, moral norm, descriptive norm, anticipated regret, and donation anxiety as direct predictors of intention, with these factors accounting for 70 percent of the variance in intentions to donate blood. A revised TPB model provided a more efficacious predictor of nondonors' intentions to donate than the standard TPB model and highlights the role that norm-based factors and affective-laden constructs play in predicting non-blood donors' intentions to donate.
North Carolina forecasts for truck traffic
DOT National Transportation Integrated Search
2006-07-01
North Carolina has experienced significant increases in truck traffic on many of its highways. Yet, current NCDOT : project-level highway traffic forecasts do not appropriately capture anticipated truck traffic growth. NCDOT : methods forecast total ...
DOT National Transportation Integrated Search
2000-03-09
The Texas Department of Transportations (TxDOT) "smart highway" project, called TransGuide, scheduled to go on line in 1995 in San Antonio, utilizes high speed computer technology to help drivers anticipate traffic conditions-- in an effort to inc...
This document presents outcomes of implementing a number of the actions described in the November 2013 Superfund Remedial Program Review (SPR) Action Plan . It also describes ongoing Action Plan efforts and projects future outcomes anticipated in FY 2015
Futures project anticipates changes and challenges facing forests of the northern United States
Stephen R. Shifley; W. Keith Moser; Michael E. Goerndt; Nianfu Song; Mark D. Nelson; David J. Nowak; Patrick D. Miles; Brett J. Butler; Ryan D. DeSantis; Francisco X. Aguilar; Brian G. Tavernia
2014-01-01
The Northern Forest Futures Project aims to reveal how today's trends and choices are likely to change the future forest landscape in the northeastern and midwestern United States. The research is focused on the 20-state quadrant bounded by Maine, Maryland, Missouri, and Minnesota. This area, which encompasses most of the Central Hardwood Forest region, is the...
ERIC Educational Resources Information Center
Lomax, Lynn A.
The environmental scanning project described in this report was undertaken at Lane Community College (LCC) in Eugene, Oregon, to enhance the college's strategic planning process by anticipating events that might differ from the economic, social, and political conditions of the present. First, an overview is provided of the purpose and intent of…
Modeling Climate Change Impacts on Landscape Evolution, Fire, and Hydrology
NASA Astrophysics Data System (ADS)
Sheppard, B. S.; O Connor, C.; Falk, D. A.; Garfin, G. M.
2015-12-01
Landscape disturbances such as wildfire interact with climate variability to influence hydrologic regimes. We coupled landscape, fire, and hydrologic models and forced them using projected climate to demonstrate climate change impacts anticipated at Fort Huachuca in southeastern Arizona, USA. The US Department of Defense (DoD) recognizes climate change as a trend that has implications for military installations, national security and global instability. The goal of this DoD Strategic Environmental Research and Development Program (SERDP) project (RC-2232) is to provide decision making tools for military installations in the southwestern US to help them adapt to the operational realities associated with climate change. For this study we coupled the spatially explicit fire and vegetation dynamics model FireBGCv2 with the Automated Geospatial Watershed Assessment tool (AGWA) to evaluate landscape vegetation change, fire disturbance, and surface runoff in response to projected climate forcing. A projected climate stream for the years 2005-2055 was developed from the Multivariate Adaptive Constructed Analogs (MACA) 4 km statistical downscaling of the CanESM2 GCM using Representative Concentration Pathway (RCP) 8.5. AGWA, an ArcGIS add-in tool, was used to automate the parameterization and execution of the Soil Water Assessment Tool (SWAT) and the KINematic runoff and EROSion2 (KINEROS2) models based on GIS layers. Landscape raster data generated by FireBGCv2 project an increase in fire and drought associated tree mortality and a decrease in vegetative basal area over the years of simulation. Preliminary results from SWAT modeling efforts show an increase to surface runoff during years following a fire, and for future winter rainy seasons. Initial results from KINEROS2 model runs show that peak runoff rates are expected to increase 10-100 fold as a result of intense rainfall falling on burned areas.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1987-06-01
This report provides a preliminary environmental assessment of two 375-MW Coal Gasification-Combined Cycle (GCC) units which the Potomac Electric Power Company proposes to construct on their existing Dickerson Generating Station site in western Montgomery County, Maryland. A mass-burn municipal solid-waste incinerator is also proposed at the site by Montgomery County. Research on the GCC technology and data for the air, land, and water environs in and around the site indicates that the proposed GCC technology offers substantial engineering, environmental, and economic benefits. Overall environmental impacts should be less than those anticipated for a comparably sized pulverized-coal power plant. Projected air,more » land, and water impacts appear to be within any applicable regulatory standards or limitations. However, four areas of concern were identified which could be of significant consequence to the suitability of the site. Recommendations are provided for detailed site evaluations including monitoring recommendations to fill data or information gaps.« less
Salton Sea Ecosystem Monitoring Project
Miles, A. Keith; Ricca, Mark A.; Meckstroth, Anne; Spring, Sarah E.
2009-01-01
The Salton Sea is critically important for wintering and breeding waterbirds, but faces an uncertain future due to water delivery reductions imposed by the Interstate and Federal Quantification Settlement Agreement of 2003. The current preferred alternative for wetland restoration at the Salton Sea is saline habitat impoundments created to mitigate the anticipated loss of wetland habitat. In 2006, a 50-hectare experimental complex that consisted of four inter-connected, shallow water saline habitat ponds (SHP) was constructed at the southeastern shoreline of the Salton Sea and flooded with blended waters from the Alamo River and Salton Sea. The present study evaluated ecological risks and benefits of the SHP concept prior to widespread restoration actions. This study was designed to evaluate (1) baseline chemical, nutrient, and contaminant measures from physical and biological constituents, (2) aquatic invertebrate community structure and colonization patterns, and (3) productivity of and contaminant risks to nesting waterbirds at the SHP. These factors were evaluated and compared with those of nearby waterbird habitat, that is, reference sites.
The role of the clinical engineer in the design of new hospitals.
Decouvelaere, M; Berrard, E; Fabrega, D
2007-01-01
Hospital construction projects take place over several years, from the initial decision to build to their completion and start of service. The owner and his building and civil engineering department have to face many administrative processes and complex techniques. It is the role of the clinical engineer to furnish the new structure with medical equipment, by integrating the constraints of these devices in the building. At each stage of the building process, the clinical engineer must contribute to a specific mission of interface between the building and the equipment, identifying and anticipating constraints, and taking care of the good preparation of the integration of this equipment in existing buildings or buildings yet to be created. If the objective of optimal compatibility between the building and its equipment is not reached, then adaptations will have to be carried out either in progress, or after the completion of work, and will be opposed to the factors of success implemented by the actors.
Environmental and health impact assessment for ports in Thailand.
Chanchang, Chamchan; Sithisarankul, Pornchai; Supanitayanon, Thanawat
2016-01-01
Port development in Thailand is an essential part of the national maritime interest in connection with ship and shore activities. The growth of maritime industry and transportation has led to the expansion of ports' areas and capacity. Each port type causes different environmental impacts. Therefore, the Port Authority of Thailand has set up guidelines on ports' environmental management. This is divided into 3 major phases; namely, planning, construction and operation commencement periods. The Report of Environmental and Health Impact Assessment (EIA, HIA and EHIA) is regarded as the environmental management process in the planning period. It is a key tool to anticipate and prevent any adverse effects that might occur on the environment as well as community health resulting from the project implementation. This measure, in turn, creates advance preparation on both the preventive and problem-solving means before the project gets off the ground. At present, the majority of new projects on port development have still been in the process of information gathering for EHIA submission. Some cannot start to operate due to their EHIA failure. For example, the Tha-sala port which did not pass EHIA, mainly because emphasis had been focused on adhering to legal regulations without taking into consideration the in-depth analysis of data being conducted by community entities in the area. Thus caused the project to be finally abolished. Impact assessment on environment and health should be aimed at detailed understanding of the community in each particular area so that effective data of objective achievement in preventing environmental problems could actually be carried out and welcomed by the concerned society.
Anticipation in turn-taking: mechanisms and information sources.
Riest, Carina; Jorschick, Annett B; de Ruiter, Jan P
2015-01-01
During conversations participants alternate smoothly between speaker and hearer roles with only brief pauses and overlaps. There are two competing types of accounts about how conversationalists accomplish this: (a) the signaling approach and (b) the anticipatory ('projection') approach. We wanted to investigate, first, the relative merits of these two accounts, and second, the relative contribution of semantic and syntactic information to the timing of next turn initiation. We performed three button-press experiments using turn fragments taken from natural conversations to address the following questions: (a) Is turn-taking predominantly based on anticipation or on reaction, and (b) what is the relative contribution of semantic and syntactic information to accurate turn-taking. In our first experiment we gradually manipulated the information available for anticipation of the turn end (providing information about the turn end in advance to completely removing linguistic information). The results of our first experiment show that the distribution of the participants' estimation of turn-endings for natural turns is very similar to the distribution for pure anticipation. We conclude that listeners are indeed able to anticipate a turn-end and that this strategy is predominantly used in turn-taking. In Experiment 2 we collected purely reacted responses. We used the distributions from Experiments 1 and 2 together to estimate a new dependent variable called Reaction Anticipation Proportion. We used this variable in our third experiment where we manipulated the presence vs. absence of semantic and syntactic information by low-pass filtering open-class and closed class words in the turn. The results suggest that for turn-end anticipation, both semantic and syntactic information are needed, but that the semantic information is a more important anticipation cue than syntactic information.
Project Integration Architecture: Inter-Application Propagation of Information
NASA Technical Reports Server (NTRS)
Jones, William Henry
2005-01-01
A principal goal of the Project Integration Architecture (PIA) is to facilitate the meaningful inter-application transfer of application-value-added information. Such exchanging applications may be largely unrelated to each other except through their applicability to an overall project; however, the PIA effort recognizes as fundamental the need to make such applications cooperate despite wide disparaties either in the fidelity of the analyses carried out, or even the disciplines of the analysis. This paper discusses the approach and techniques applied and anticipated by the PIA project in treating this need.
Exploitation and Benefits of BIM in Construction Project Management
NASA Astrophysics Data System (ADS)
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.
NASA Astrophysics Data System (ADS)
Busuioc, Aristita; Dumitrescu, Alexandru; Dumitrache, Rodica; Iriza, Amalia
2017-04-01
Seasonal climate forecasts in Europe are currently issued at the European Centre for Medium-Range Weather Forecasts (ECMWF) in the form of multi-model ensemble predictions available within the "EUROSIP" system. Different statistical techniques to calibrate, downscale and combine the EUROSIP direct model output are used to optimize the quality of the final probabilistic forecasts. In this study, a statistical downscaling model (SDM) based on canonical correlation analysis (CCA) is used to downscale the EUROSIP seasonal forecast at a spatial resolution of 1km x 1km over the Movila farm placed in southeastern Romania. This application is achieved in the framework of the H2020 MOSES project (http://www.moses-project.eu). The combination between monthly standardized values of three climate variables (maximum/minimum temperatures-Tmax/Tmin, total precipitation-Prec) is used as predictand while combinations of various large-scale predictors are tested in terms of their availability as outputs in the seasonal EUROSIP probabilistic forecasting (sea level pressure, temperature at 850 hPa and geopotential height at 500 hPa). The predictors are taken from the ECMWF system considering 15 members of the ensemble, for which the hindcasts since 1991 until present are available. The model was calibrated over the period 1991-2014 and predictions for summers 2015 and 2016 were achieved. The calibration was made for the ensemble average as well as for each ensemble member. The model was developed for each lead time: one month anticipation for June, two months anticipation for July and three months anticipation for August. The main conclusions from these preliminary results are: best predictions (in terms of the anomaly sign) for Tmax (July-2 months anticipation, August-3 months anticipation) for both years (2015, 2016); for Tmin - good predictions only for August (3 months anticipation ) for both years; for precipitation, good predictions for July (2 months anticipation) in 2015 and August (3 months anticipation) in 2016; failed prediction for June (1-month anticipation) for all parameters. To see if the results obtained for 2015 and 2016 summers are in agreement with the general ECMWF model performance in forecast of the three predictors used in the CCA SDM calibration, the mean bias and root mean square errors (RMSE) calculated over the entire period in each grid point, for each ensemble member and ensemble average were computed. The obtained results are confirmed, showing highest ECMWF performance in forecasting of the three predictors for 3 months anticipation (August) and lowest performance for one month anticipation (June). The added value of the CCA SDM in forecasting local Tmax/Tmin and total precipitation was compared to the ECMWF performance using nearest grid point method. Comparisons were performed for the 1991-2014 period, taking into account the forecast made in May for July. An important improvement was found for the CCA SDM predictions in terms of the RMSE value (computed against observations) for Tmax/Tmin and less for precipitation. The tests are in progress for the other summer months (June, July).
Six year improvement program : fiscal years 1996-97 thru 2001-2002 (Vol. 2)
DOT National Transportation Integrated Search
1997-01-01
This program is the Commonwealth Transportation Board's plan for the use of funds anticipated to be available for ports, airports, public transit, and highway construction in the 1996-97 fiscal year. The Board also uses this Six-Year Program to distr...
Six Year Improvement Program: Fiscal Years 1996-97 thru 2001-2002 (Vol. 1)
DOT National Transportation Integrated Search
1997-01-01
This program is the Commonwealth Transportation Board's plan for the use of funds anticipated to be available for ports, airports, public transit, and highway construction in the 1996-97 fiscal year. The Board also uses this Six-Year Program to distr...
Exploring Wholeness in Music Teachers' Lives
ERIC Educational Resources Information Center
Fordice, Billy Donald
2013-01-01
This qualitative research explored how the retelling of a life story influenced teachers' self-understanding. Informed by the disciplines of psychology, anthropology, and philosophy I constructed a conceptual framework of life as a continuous narrative, reflected and focused by past and anticipated experiences. This framework was informed by…
Toward A Social Policy Analysis Curriculum.
ERIC Educational Resources Information Center
Stimson, John; Stimson, Ardyth
An eight-course curriculum in social policy analysis which follows a policy analysis paradigm is proposed. The undergraduate curriculum concentrates on the ability to appreciate and operate under uncertainty; anticipation of interrelated, unexpected ramifications of new stimuli; understanding of the social construction of problems and their cures;…
Eversource Energy 2015 Annual Report
2018-03-21
... expect,” “anticipate,” “intend,” “plan,” “project,” “believe,” “forecast,” “should,” “could ... the subsidiary companies could retain their free cash flow to fund ...
Department of Transportation's intelligent transportation systems (ITS) projects book
DOT National Transportation Integrated Search
1998-01-01
Intelligent Transportation Systems (ITS), formerly Intelligent Vehicle-Highway Systems (IVHS), provide the tools to help us address current surface transportation problems, as well as anticipate and address future demands through an intermodal, strat...
Olympic Fisher Reintroduction Project: Progress report 2008-2011
Jeffrey C. Lewis,; Patti J. Happe,; Jenkins, Kurt J.; Manson, David J.
2012-01-01
This progress report summarizes the final year of activities of Phase I of the Olympic fisher restoration project. The intent of the Olympic fisher reintroduction project is to reestablish a self-sustaining population of fishers on the Olympic Peninsula. To achieve this goal, the Olympic fisher reintroduction project released 90 fishers within Olympic National Park from 2008 to 2010. The reintroduction of fishers to the Olympic Peninsula was designed as an adaptive management project, including the monitoring of released fishers as a means to (1) evaluate reintroduction success, (2) investigate key biological and ecological traits of fishers, and (3) inform future reintroduction, monitoring, and research efforts. This report summarizes reintroduction activities and preliminary research and monitoring results completed through December 2011. The report is non-interpretational in nature. Although we report the status of movement, survival, and home range components of the research, we have not completed final analyses and interpretation of research results. Much of the data collected during the monitoring and research project will be analyzed and interpreted in the doctoral dissertation being developed by Jeff Lewis; the completion of this dissertation is anticipated prior to April 2013. We anticipate that this work, and analyses of other data collected during the project, will result in several peer-reviewed scientific publications in ecological and conservation journals, which collectively will comprise the final reporting of work summarized here. These publications will include papers addressing post-release movements, survival, resource selection, food habits, and age determination of fishers.
42 CFR 137.362 - May construction project agreements be amended?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May construction project agreements be amended? 137... of the Secretary in Establishing and Implementing Construction Project Agreements § 137.362 May construction project agreements be amended? Yes, the Self-Governance Tribe, at its discretion, may request the...
Code of Federal Regulations, 2010 CFR
2010-04-01
... contract. This does not involve construction project management as defined in paragraph (d) of this section...) Construction project management means direct responsibility for the construction project through day-to-day on-site management and administration of the project. Activities may include cost management, project...
Butler, Ruth
2006-09-01
The aims of this research were to examine the predictions that (a) the kind of evaluation pupils anticipate will influence their initial achievement goals and, as a result, the quality and consequences of task engagement; and (b) initial mastery goals will promote new learning and intrinsic motivation and initial ability goals will promote entity beliefs that ability is fixed. Participants were 312 secondary school pupils at ages 13-15. Pupils expected to receive normative evaluation, temporal evaluation (scores over time) or no evaluation. Mastery and ability goals were measured before pupils worked on challenging problems; intrinsic motivation and entity beliefs were measured after task completion. Anticipation of temporal evaluation enhanced initial mastery goals, anticipation of normative evaluation enhanced ability goals and the no-evaluation condition undermined both. Anticipation of temporal evaluation enhanced new learning (strategy acquisition and performance gains) and intrinsic motivation both directly and by enhancing initial mastery goals; anticipation of normative evaluation enhanced entity beliefs by enhancing ability goals. Results confirmed that evaluation conveys potent cues as to the goals of activity. They also challenged claims that both mastery and ability goals can be adaptive by demonstrating that these were differentially associated with positive versus negative processes and outcomes. Results have theoretical and applied implications for understanding and improving evaluative practices and student motivation.
2014 Wind Technologies Market Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiser, Ryan; Bolinger, Mark; Barbose, Galen
Wind power capacity additions in the United States rebounded in 2014, and continued growth through 2016 is anticipated. Recent and projected near-term growth is supported by the industry’s primary federal incentive—the production tax credit (PTC)—which is available for projects that began construction by the end of 2014. Wind additions are also being driven by recent improvements in the cost and performance of wind power technologies, which have resulted in the lowest power sales prices ever seen in the U.S. wind sector. Growing corporate demand for wind energy and state-level policies play important roles as well. Expectations for continued technological advancementsmore » and cost reductions may further boost future growth. At the same time, the prospects for growth beyond 2016 are uncertain. The PTC has expired, and its renewal remains in question. Continued low natural gas prices, modest electricity demand growth, and limited near-term demand from state renewables portfolio standards (RPS) have also put a damper on growth expectations. These trends, in combination with increasingly global supply chains, have limited the growth of domestic manufacturing of wind equipment. What they mean for wind power additions through the end of the decade and beyond will be dictated in part by future natural gas prices, fossil plant retirements, and policy decisions.« less
Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective
NASA Astrophysics Data System (ADS)
Subramanyam, K.; Haridharan, M. K.
2017-07-01
Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.
Cognitive and emotional factors associated with elective breast augmentation among young women.
Moser, Stephanie E; Aiken, Leona S
2011-01-01
The purpose of this research was to propose and evaluate a psychosocial model of young women's intentions to obtain breast implants and the preparatory steps taken towards having breast implant surgery. The model integrated anticipated regret, descriptive norms and image norms from the media into the theory of planned behaviour (TPB). Focus groups (n = 58) informed development of measures of outcome expectancies, preparatory steps and normative influence. The model was tested and replicated among two samples of young women who had ever considered getting breast implants (n = 200, n = 152). Intentions and preparatory steps served as outcomes. Model constructs and outcomes were initially assessed; outcomes were re-assessed 11 weeks later. Evaluative attitudes and anticipated regret predicted intentions; in turn, intentions, along with descriptive norms, predicted subsequent preparatory steps. Perceived risk (susceptibility, severity) of negative medical consequences of breast implants predicted anticipated regret, which predicted evaluative attitudes. Intentions and preparatory steps exhibited interplay over time. This research provides the first comprehensive model predicting intentions and preparatory steps towards breast augmentation surgery. It supports the addition of anticipated regret to the TPB and suggests mutual influence between intentions and preparatory steps towards a final behavioural outcome.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
In 1998, GKN Sinter Metals completed a successful compressed air system improvement project at its Salem, Indiana manufacturing facility. The project was performed after GKN undertook a survey of its system in order to solve air quality problems and to evaluate whether the capacity of their compressed air system would meet their anticipated plant expansion. Once the project was implemented, the plant was able to increase production by 31% without having to add any additional compressor capacity.
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2012 CFR
2012-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
NASA Astrophysics Data System (ADS)
Dialesandro, J.; Elias, E.; Rango, A.; Steele, C. M.
2016-12-01
The Central Valley of California, like most dryland agricultural areas in the Southwest United States, relies heavily on winter snowpack for water resources. Projections of future climate in the Sierra Mountains of California calls for a warmer climate regime that will impact the snowpack in the Sierra Mountains and thus the water supply for downstream agriculture and municipal uses within California's Central Valley. We simulate the impacts of two future time windows (2040-2069 and 2070-2099) and two future climate scenarios (RCP 4.5 and 8.5) on King's River using the Snowmelt Runoff Model. Snow depletion curves for 2010 are generated using MODIS and SRM parameters are adjusted until measured and simulated runoff reach acceptable agreement (R2 = .81). Future projections are based upon the multimodel mean of 20 CMIP5 models for seasonal future temperature and precipitation at high and low elevation points in the watershed from the multivariate adaptive constructed analogs (MACA) downscaled dataset. Changes in monthly inflow to Pineflat Reservoir, at the pour point of King's River watersheds, show a large decline in June and July inflow for all future climate simulations. Conversely, simulated spring inflow to Pineflat Reservoir is larger in the future. Impacts are most pronounced for end of the century (2070-2099), business as usual (RCP 8.5) simulation. Results are discussed with regard to implications for reservoir storage, groundwater recharge and creative solutions to cope with anticipated changes in runoff.
NASA Astrophysics Data System (ADS)
Drake, J.; Schamel, D.; Fisher, P.; Terschak, J. A.; Stelling, P.; Almberg, L.; Phillips, E.; Forner, M.; Gregory, D.
2002-12-01
When a gummi-bear is introduced into hot potassium chlorate there is a powerful reaction. This is analogous to the response we have seen to the Alaska Summer Research Academy (ASRA). ASRA is a residential science research camp supported by the College of Science, Engineering and Mathematics at the University of Alaska Fairbanks. The hallmark of ASRA is the opportunity for small groups of 4 or fewer students, ages 10-17, to conduct scientific research and participate in engineering design projects with university faculty and researchers as mentors. Participating scientists, engineers, faculty, graduate students, and K-12 teachers from a variety of disciplines design individual research units and guide the students through designing and constructing a project, collecting data, and synthesizing results. The week-long camp culminates with the students from each project making a formal presentation to the camp and public. In its second year ASRA is already a huge success, quadrupling in size from 21 students in 2001 to 89 students in 2002. Due to a high percentage of returning students, we anticipate there will be a waiting list next year. This presentation contains perspectives from administrators, instructors, staff, and students. Based on our experience we feel there is a large potential demand for education and public outreach (EPO) in university settings. We believe the quality and depth of the ASRA experience directly contributes to the success of a worthwhile EPO program. ASRA will be portrayed as a useful model for EPO at other institutions.
Change of Attitude? A Diachronic Study of Stance
ERIC Educational Resources Information Center
Hyland, Ken; Jiang, Feng
2016-01-01
Successful research writers construct texts by taking a novel point of view toward the issues they discuss while anticipating readers' imagined reactions to those views. This intersubjective positioning is encompassed by the term stance and, in various guises, has been a topic of interest to researchers of written communication and applied…
22 CFR 226.25 - Revision of budget and program plans.
Code of Federal Regulations, 2012 CFR
2012-04-01
... section. (c) For nonconstruction awards, recipients shall request prior approvals from the USAID Agreement... recipient does not receive an award or if the award is less than anticipated and inadequate to cover such... construction awards, recipients shall request prior written approval promptly from the USAID Agreement Officer...
22 CFR 226.25 - Revision of budget and program plans.
Code of Federal Regulations, 2013 CFR
2013-04-01
... section. (c) For nonconstruction awards, recipients shall request prior approvals from the USAID Agreement... recipient does not receive an award or if the award is less than anticipated and inadequate to cover such... construction awards, recipients shall request prior written approval promptly from the USAID Agreement Officer...
22 CFR 226.25 - Revision of budget and program plans.
Code of Federal Regulations, 2014 CFR
2014-04-01
... section. (c) For nonconstruction awards, recipients shall request prior approvals from the USAID Agreement... recipient does not receive an award or if the award is less than anticipated and inadequate to cover such... construction awards, recipients shall request prior written approval promptly from the USAID Agreement Officer...
22 CFR 226.25 - Revision of budget and program plans.
Code of Federal Regulations, 2011 CFR
2011-04-01
... section. (c) For nonconstruction awards, recipients shall request prior approvals from the USAID Agreement... recipient does not receive an award or if the award is less than anticipated and inadequate to cover such... construction awards, recipients shall request prior written approval promptly from the USAID Agreement Officer...
40 CFR 63.345 - Provisions for new and reconstructed sources.
Code of Federal Regulations, 2014 CFR
2014-07-01
... completion dates of the construction or reconstruction; (vi) The anticipated date of (initial) startup of the affected source; (vii) The type of process operation to be performed (hard or decorative chromium... startup had not occurred before January 25, 1995, the notification shall be submitted as soon as...
40 CFR 63.345 - Provisions for new and reconstructed sources.
Code of Federal Regulations, 2012 CFR
2012-07-01
... completion dates of the construction or reconstruction; (vi) The anticipated date of (initial) startup of the affected source; (vii) The type of process operation to be performed (hard or decorative chromium... startup had not occurred before January 25, 1995, the notification shall be submitted as soon as...
40 CFR 63.345 - Provisions for new and reconstructed sources.
Code of Federal Regulations, 2013 CFR
2013-07-01
... completion dates of the construction or reconstruction; (vi) The anticipated date of (initial) startup of the affected source; (vii) The type of process operation to be performed (hard or decorative chromium... startup had not occurred before January 25, 1995, the notification shall be submitted as soon as...
New Patterns of Collaboration and Rivalry in the US and European Defense and Aerospace Industries
2009-08-19
of DaimlerChrysler Aerospace (DASA) of Germany, Aerospatiale Matra of France, and Construcciones Aeronauticas S.A. (CASA) of Spain. Its statutory...of the Cobham company of the UK) at its Bridgeport, West Virginia, plant. EADS also anticipates constructing a facility near the Sargent-Fletcher
Construction Cost Growth for New Department of Energy Nuclear Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kubic, Jr., William L.
Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facilitymore » (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.« less
NASA Technical Reports Server (NTRS)
Chamberlain, Robert G.; Duquette, William H.; Provenzano, Joseph P.; Brunzie, Theodore J.; Jordan, Benjamin
2011-01-01
The Athena simulation software supports an analyst from DoD or other federal agency in making stability and reconstruction projections for operational analyses in areas like Iraq or Afghanistan. It encompasses the use of all elements of national power: diplomatic, information, military, and economic (DIME), and anticipates their effects on political, military, economic, social, information, and infrastructure (PMESII) variables in real-world battle space environments. Athena is a stand-alone model that provides analysts with insights into the effectiveness of complex operations by anticipating second-, third-, and higher-order effects. For example, the first-order effect of executing a curfew may be to reduce insurgent activity, but it may also reduce consumer spending and keep workers home as second-order effects. Reduced spending and reduced labor may reduce the gross domestic product (GDP) as a third-order effect. Damage to the economy will have further consequences. The Athena approach has also been considered for application in studies related to climate change and the smart grid. It can be applied to any project where the impacts on the population and their perceptions are important, and where population perception is important to the success of the project.
Mapping of information and identification of construction waste at project life cycle
NASA Astrophysics Data System (ADS)
Wibowo, Mochamad Agung; Handayani, Naniek Utami; Nurdiana, Asri; Sholeh, Moh Nur; Pamungkas, Gita Silvia
2018-03-01
The development of construction project towards green construction is needed in order to improve the efficiency of construction projects. One that needs to be minimized is construction waste. Construction waste is waste generated from construction project activities, both solid waste and non solid waste. More specifically, the waste happens at every phase of the project life cycle. Project life cycle are the stage of idea, design, construction, and operation/maintenance. Each phase is managed by different stakeholders. Therefore it requires special handling from the involved stakeholders. The objective of the study is to map the information and identify the waste at each phase of the project life cycle. The purpose of mapping is to figure out the process of information and product flow and with its timeline. This mapping used Value Stream Mapping (VSM). Identification of waste was done by distributing questionnaire to respondents to know the waste according to owner, consultant planner, contractor, and supervisory consultant. The result of the study is the mapping of information flow and product flow at the phases of idea, design, construction, and operation/ maintenance.
The Secure Distributed Operating System Design Project
1988-06-01
a di- verse group of people . Its organization isolates different aspects of the project, such as expected results, preliminary results, and technical...modeled after these procedures. " Automation: computers are commonly used to automate tasks previously performed by people ; many of these tasks are... people commonly con- sidered the threats anticipated to the system and mechanisms that are used to prevent those threats. Both hardware and software
Laredo District Coahuila/Nuevo Leon/Tamaulipas border master plan.
DOT National Transportation Integrated Search
2012-06-01
Border Master Plans document a regions needs and priorities, and recommend a mechanism to ensure coordination on current and planned future port of entry (POE) projects and supporting transportation infrastructure to serve the anticipated demand i...
NASA Technical Reports Server (NTRS)
Mill, F. W.; Krebs, G. N.; Strauss, E. S.
1976-01-01
The Multi-Purpose System Simulator (MPSS) model was used to investigate the current and projected performance of the Monitor and Control Display System (MACDS) at the Goddard Space Flight Center in processing and displaying launch data adequately. MACDS consists of two interconnected mini-computers with associated terminal input and display output equipment and a disk-stored data base. Three configurations of MACDS were evaluated via MPSS and their performances ascertained. First, the current version of MACDS was found inadequate to handle projected launch data loads because of unacceptable data backlogging. Second, the current MACDS hardware with enhanced software was capable of handling two times the anticipated data loads. Third, an up-graded hardware ensemble combined with the enhanced software was capable of handling four times the anticipated data loads.
Onwujekwe, Obinna; Fox-Rushby, Julia; Hanson, Kara
2008-01-01
This study examines whether making question formats better fit the cultural context of markets would improve the construct validity of estimates of willingness to pay (WTP). WTP for insecticide-treated mosquito nets was elicited using the bidding game, binary with follow-up (BWFU), and a novel structured haggling technique (SH) that mimicked price taking in market places in the study area. The results show that different question formats generated different distributions of WTP. Following a comparison of alternative models for each question format, construct validity was compared using the most consistently appropriate model across question formats for the positive WTP values, in this case, ordinary least squares. Three criteria (the number of statistically significant explanatory variables that had the anticipated sign, the value of the adjusted R(2), and the proportion that were statistically significant With the anticipated sign) used to assess the relative performance of each question format indicated that SH performed best and BWFU worst. However, differences in the levels of income, education, and percentage of household heads responding to the different question formats across the samples complicate this conclusion. Hence, the results suggest that the SH technique is worthy of further investigation and use.
Effective Safety Management in Construction Project
NASA Astrophysics Data System (ADS)
Othman, I.; Shafiq, Nasir; Nuruddin, M. F.
2017-12-01
Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.
Research on cost control and management in high voltage transmission line construction
NASA Astrophysics Data System (ADS)
Xu, Xiaobin
2017-05-01
Enterprises. The cost control is of vital importance to the construction enterprises. It is the key to the profitability of the transmission line project, which is related to the survival and development of the electric power construction enterprises. Due to the long construction line, complex and changeable construction terrain as well as large construction costs of transmission line, it is difficult for us to take accurate and effective cost control on the project implementation of entire transmission line. Therefore, the cost control of transmission line project is a complicated and arduous task. It is of great theoretical and practical significance to study the cost control scheme of transmission line project by a more scientific and efficient way. Based on the characteristics of the construction project of the transmission line project, this paper analyzes the construction cost structure of the transmission line project and the current cost control problem of the transmission line project, and demonstrates the necessity and feasibility of studying the cost control scheme of the transmission line project more accurately. In this way, the dynamic cycle cost control process including plan, implementation, feedback, correction, modification and re-implement is achieved to realize the accurate and effective cost control of entire electric power transmission line project.
Research on the application of BIM technology in the whole life cycle of construction projects
NASA Astrophysics Data System (ADS)
Chang-liu, CHEN; Wei-wei, KOU; Shuai-hua, YE
2018-05-01
BIM technology can realize information sharing, and good BIM application will reduce the whole life cycle cost of construction projects. The popularization of BIM technology challenges the application of BIM technology at all stages of the whole life cycle of the construction project. It will give full play to the value of BIM, if developing a reasonable BIM project execution plan, defining BIM requirements, specifying Level of Development, determining the BIM quality control plan and clearing BIM application content of each stage, and will provide a unified method for project stakeholders, realize the whole life cycle of construction projects, and achieve the desired information sharing in construction project.
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2010 CFR
2010-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2012 CFR
2012-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2014 CFR
2014-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2011 CFR
2011-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2013 CFR
2013-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
Stigma Associated with Classical Congenital Adrenal Hyperplasia in Women's Sexual Lives.
Meyer-Bahlburg, Heino F L; Khuri, Jananne; Reyes-Portillo, Jazmin; Ehrhardt, Anke A; New, Maria I
2018-05-01
The risk of intersex-related stigma often serves as social indication for "corrective" genital surgery, but has not been comprehensively documented. In preparation for the development of an intersex-specific stigma assessment tool, this qualitative project aimed to explore stigma in girls and women with classical congenital adrenal hyperplasia (CAH) due to 21-hydroxylase deficiency. As part of a comprehensive follow-up project, 62 adult women with classical CAH (age range 18-51 years) took part in an open-ended retrospective interview focusing on the impact of CAH and its treatment on various aspects of girls' and women's lives. Deductive qualitative content analysis (Patton, 2014) of de-identified transcripts involved categorization of three types of stigma: experienced, anticipated, and internalized. Two-fifths of the participants reported CAH-related stigma in romantic/sexual situations. Stigma enactment by romantic partners occurred in reaction to both genital and non-genital sex-atypical features of CAH and sometimes included explicit questioning of the women's true gender. Stigma anticipation by the women and their related avoidance of nudity, genital exposure, and romantic involvement altogether were frequent. Internalization of stigma occurred as well. In conclusion, the data suggest that many women with CAH experience, anticipate, and/or internalize intersex-related stigma in the context of their romantic/sexual lives.
Code of Federal Regulations, 2010 CFR
2010-10-01
... must be included in the construction project agreement? The construction project agreement must include..., and (d) An assurance that no action will be taken on the construction phase of the project that would... 42 Public Health 1 2010-10-01 2010-10-01 false What environmental considerations must be included...
Research on Green Construction Technology Applied at Guangzhou Hongding Building Project
NASA Astrophysics Data System (ADS)
Lou, Yong Zhong
2018-06-01
The green construction technology is the embodiment of sustainable development strategy in the construction industry, and it is a new construction mode which requires a higher environmental protection. Based on the Hongding building project, this paper describes the application and innovation of technical in the process of implementing green construction in the project, as well as the difficulties and characteristics in the specific practice; .The economic and social benefits of green construction are compared to the traditional construction model; .The achievements and experience of the green construction technology are summarized in the project; The ideas and methods in the process of implementing green construction are abstracted; some suggestions are put forward for the development of green construction.
42 CFR 137.327 - May multiple projects be included in a single construction project agreement?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...
The communication in industrialised building system (IBS) construction project: Virtual environment
NASA Astrophysics Data System (ADS)
Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd
2017-10-01
Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.
Highway construction related business impacts : phase 3 effort for the town of Dubois.
DOT National Transportation Integrated Search
2008-03-01
Highway construction projects not only impact the traveling public, but can also impact businesses situated adjacent to the construction project. Even : though construction projects are temporary situations, many businesses worry about the level of i...
The Role of Anticipation in Intelligent Systems
NASA Astrophysics Data System (ADS)
Klir, George J.
2002-09-01
The paper explores the relationship between the area of anticipatory systems and the area of intelligent systems. After an overview of these areas, the role of anticipation in intelligent systems is discussed and it is argued that the area of intelligent systems can greatly benefit by importing the various results developed within the area of anticipatory systems. Distinctions between hard and soft systems and between hard and soft computing are then discussed. It is explained why intelligent systems are by necessity soft and why soft computing is essential for their construction. It is finally argued that the area of anticipatory systems can enlarge its scope by importing knowledge regarding soft systems and soft computing from the area of intelligent systems.
Relationship between time management in construction industry and project management performance
NASA Astrophysics Data System (ADS)
Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin
2016-08-01
Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.
Graphite fiber textile preform/copper matrix composites
NASA Technical Reports Server (NTRS)
Filatovs, G. J.
1993-01-01
This project has the objective of exploring the use of graphite fiber textile preform/copper matrix composites in spacecraft heat transmitting and radiating components. The preforms are to be fabricated by braiding of tows and when infiltrated with copper will result in a 3-D reinforced, near net shape composite with improved specific properties such as lower density and higher stiffness. It is anticipated that the use of textile technology will result in a more robust preform and consequently better final composite; it is hard to anticipate what performance tradeoffs will result, and these will be explored through testing and characterization.
ERIC Educational Resources Information Center
Agron, Joe
1998-01-01
Examines building-cost trend data for educational facilities from the American School & University's 24th annual Official Education Construction Report for 1997. Data tables list education construction by projects completed; by projected spending; institution type; type of spending; projects projected for completion; and how construction costs…
Learning the ABCs (of Project Management)
NASA Technical Reports Server (NTRS)
Frandsen, Allan
2003-01-01
To lead a project effectively, one has to establish and maintain the flexibility to take appropriate actions when needed. Overconstrained situations should be avoided. To get on top of matters and stay there, a manager needs to anticipate what it will take to successfully complete the job. Physical and financial resources, personnel, and management structure are all important considerations. Carving out the necessary turf up front can make a world of difference to the project's outcome. After the "what," "where," and "when" of a project are nailed down, the next question is "how" to do the job. When I first interviewed for the job of Science Payload Manager on the Advanced Composition (ACE) Explorer mission, Dr. Edward Stone (ACE Principal Investigator) asked, "Al, give me an idea of your management style." It was a question I had not considered before. I thought about it for a few seconds and then answered, "Well, the first descriptive term that comes to mind is the word "tranquility". That seemed to startle him. So I added, "I guess what I mean is, that if the situation is tranquil and the project is running smoothly, then I've anticipated all the problems and taken necessary actions to head them off." He then asked: "Have you ever reached this state?" "No," I admitted, "but I strive for it." That seemed to satisfy him because I got the job.
Advanced Public Transportation Systems (Apts) Project Summaries, June 1996, Office Of Mobility
DOT National Transportation Integrated Search
1996-06-01
ITS APPLIES STATE-OF-THE-ART AND EMERGING TECHNOLOGIES TO PROVIDE MORE EFFICIENT AND EFFECTIVE SOLUTIONS TO CURRENT MULTIMODAL TRANSPORTATION PROBLEMS, AS WELL AS ANTICIPATE AND ADDRESS FUTURE TRANSPORTATION DEMANDS THROUGH AN INTERMODAL, STRATEGIC A...
Level-2 Milestone 3504: Scalable Applications Preparations and Outreach for the Sequoia ID (Dawn)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Futral, W. Scott; Gyllenhaal, John C.; Hedges, Richard M.
2010-07-02
This report documents LLNL SAP project activities in anticipation of the ASC Sequoia system, ASC L2 milestone 3504: Scalable Applications Preparations and Outreach for the Sequoia ID (Dawn), due June 30, 2010.
Effects of online shopping on vehicular traffic
DOT National Transportation Integrated Search
2001-10-01
The purpose of this research was to assess and project the effects of online shopping on vehicular traffic. As more people purchased more goods and services online, we anticipated that short-distance traffic would be reduced. Working against this tre...
FY 2015 Request for Proposals for the Source Reduction Assistance Grant Program
EPA is announcing the availability of SRA grants and/or cooperative agreements to fund projects supporting p2/source reduction and resource conservation; it is anticipated up to $1,200,000 will be available collectively.
77 FR 60168 - Environmental Impact Statement: San Joaquin and Stanislaus Counties, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-02
... (3.5 miles) in length. The project was anticipated to improve traffic safety and operations by reducing congestion and accidents. Since the NOI to prepare an EIS was published in the Federal Register on...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-11
... Information Collection: Comment Request; Multifamily Project Construction Contract, Building Loan Agreement, and Construction Change Request AGENCY: Office of the Assistant Secretary for Housing, HUD. ACTION.... This Notice also lists the following information: Title of Proposal: Multifamily Project Construction...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
Improvement of the cost-benefit analysis algorithm for high-rise construction projects
NASA Astrophysics Data System (ADS)
Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir
2018-03-01
The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.
25 CFR 1000.240 - What construction programs included in an AFA are subject to this subpart?
Code of Federal Regulations, 2010 CFR
2010-04-01
..., coordination, responsibility for the construction project, day-to-day on-site management on site-management and administration of the project, which may include cost management, project budgeting, project scheduling and... Tribal, facilities and projects. (b) The following programs and activities are not construction programs...
ERIC Educational Resources Information Center
Wang, Heng
2017-01-01
Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects' supply chain and determined that RFID technology can improve the…
13 CFR 308.1 - Use of funds in Projects constructed under projected cost.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Use of funds in Projects constructed under projected cost. 308.1 Section 308.1 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PERFORMANCE INCENTIVES § 308.1 Use of funds in Projects constructed under...
New Advances in Molecular Therapy for Muscle Repair after Diseases and Injuries
2009-04-01
broader scientific community . Investigator: Johnny Huard - 9 - Project # 1 Progress Report The use of suramin to improve muscle healing after...black arrow ) in grey matter indicated small neuron and axon communication . Project # 5 Final Report Inhibiting cell death and promoting muscle...potential to treat muscle wasting induced by cancer. We anticipate that these results can be generalized to the treatment of other genetic and acquired
Application of BIM technology in construction bidding
NASA Astrophysics Data System (ADS)
wei, Li
2017-12-01
bidding is a very important step of construction project. For the owners, bidding is the key link of selecting the best construction plan and saving the project cost to the maximum extent. For Construction Corporation, it is the key to show their construction technology which can improve the probability of winning the bid. this paper researches on the application of BIM technology in bidding process of construction project in detail, and discussesthe application of BIM technology in construction field comprehensively.
The Application of the Real Options Method for the Evaluation of High-Rise Construction Projects
NASA Astrophysics Data System (ADS)
Izotov, Aleksandr; Rostova, Olga; Dubgorn, Alissa
2018-03-01
The paper is devoted to the problem of evaluation of high-rise construction projects in a rapidly changing environment. The authors proposed an algorithm for constructing and embedding real options in high-rise construction projects, which makes it possible to increase the flexibility of managing multi-stage projects that have the ability to adapt to changing conditions of implementation.
Portfolio Use in Educational Leadership Preparation Programs: From Theory to Practice.
ERIC Educational Resources Information Center
Barnett, Bruce G.
1995-01-01
The use of portfolios as an authentic measure of competence is discussed, particularly in educational administrator education programs. Rationale, purposes, and appropriate content for portfolios are outlined, based on the intended use. It is noted that a period of adjustment to portfolio construction and incorporation should be anticipated. (MSE)
78 FR 13663 - Equitrans, L.P. Notice of Request Under Blanket Authorization
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... Regulations under the Natural Gas Act (NGA) as amended, to construct, own, operate, and maintain its Low... Equitrans to be able to receive gas in the future from high-pressure production wells located in the Marcellus Shale Play. Equitrans anticipates that work on all pipeline replacement and retest activities will...
Five-Factor Personality Domains, Self-Efficacy, Career-Outcome Expectations, and Career Indecision
ERIC Educational Resources Information Center
Feldt, Ronald C.; Woelfel, Cheryl
2009-01-01
According to social cognitive career theory, decisions to pursue a career may be influenced by self-efficacy expectations and anticipated career outcomes, thus we examined the incremental validity of these constructs beyond gender and personality. 179 undergraduate college students completed a survey, the Career Decision Scale (CDS), and the NEO…
Cognitive Anxiety: A Method of Content Analysis for Verbal Samples
ERIC Educational Resources Information Center
Viney, Linda L.; Westbrook, Mary
1976-01-01
Five groups--second year students, psychiatric inpatients, incoming students, mothers, and relocated women were tested with verbal samples to examine the effects of cognitive anxiety as a construct implying a reaction to being unable to anticipate and integrate experiences meaningfully. The measure used was found to be valid. (Author/DEP)
A Strategic Approach for Supporting the Future of Civil Engineering Education in Europe
ERIC Educational Resources Information Center
Angelides, Demos C.; Loukogeorgaki, Eva
2005-01-01
A new strategic vision of the extensively debated European higher education is proposed with focus on civil engineering. Civil engineering education for the future is considered with relevance to potential world-wide trends and anticipated societal requirements and, therefore, required employee qualifications of the construction-related providers…
40 CFR 63.1515 - Notifications.
Code of Federal Regulations, 2013 CFR
2013-07-01
... startup after the effective date of this subpart and for which an application for approval of construction... major affected source that has an initial startup after the effective date of this subpart and for which...); (iii) Anticipated date of startup; and (iv) Actual date of startup. (4) As required by § 63.9(b)(5...
40 CFR 63.1515 - Notifications.
Code of Federal Regulations, 2012 CFR
2012-07-01
... startup after the effective date of this subpart and for which an application for approval of construction... major affected source that has an initial startup after the effective date of this subpart and for which...); (iii) Anticipated date of startup; and (iv) Actual date of startup. (4) As required by § 63.9(b)(5...
40 CFR 63.1515 - Notifications.
Code of Federal Regulations, 2014 CFR
2014-07-01
... startup after the effective date of this subpart and for which an application for approval of construction... major affected source that has an initial startup after the effective date of this subpart and for which...); (iii) Anticipated date of startup; and (iv) Actual date of startup. (4) As required by § 63.9(b)(5...
More information on testing for maximum indoor pollutant concentrations for acceptance of the facility, as well as requirements for Independent Materials Testing of specific materials anticipated to have major impact on indoor air quality.
Aesthetic Pursuits: Windows, Frames, Words, Images. Part I
ERIC Educational Resources Information Center
Burke, Ken
2005-01-01
In his previous articles (1997, 1998, 1999), the author developed a theoretical and applied approach to analyzing interactions between the uses of constructive design elements in a wide range of images and the anticipated responses by their viewers. This Image Presentation Theory--IPT--is based in the traditional cinematic concepts of "window" and…
Methodology of project management at implementation of projects of high-rise construction
NASA Astrophysics Data System (ADS)
Papelniuk, Oksana
2018-03-01
High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.
Energy and Economic Impacts of Projected Freight Transportation Improvements
DOT National Transportation Integrated Search
1977-05-01
This study examines current and future energy impacts for each major freight mode, by commodity, and, in many cases, by vehicle types. It also discusses potential economic impacts of these anticipated changes. The study is limited to intercity freigh...
14 CFR 1274.209 - Evaluation and selection.
Code of Federal Regulations, 2013 CFR
2013-01-01
... and educational institutions, including historically black colleges and universities and minority... among U.S. firms, identification of potential markets, appropriateness of business risks. (f) Proposal... business base projections, the market for proposed products, and/or the impact of anticipated product price...
14 CFR 1274.209 - Evaluation and selection.
Code of Federal Regulations, 2010 CFR
2010-01-01
... and educational institutions, including historically black colleges and universities and minority... among U.S. firms, identification of potential markets, appropriateness of business risks. (f) Proposal... business base projections, the market for proposed products, and/or the impact of anticipated product price...
14 CFR 1274.209 - Evaluation and selection.
Code of Federal Regulations, 2011 CFR
2011-01-01
... and educational institutions, including historically black colleges and universities and minority... among U.S. firms, identification of potential markets, appropriateness of business risks. (f) Proposal... business base projections, the market for proposed products, and/or the impact of anticipated product price...
14 CFR § 1274.209 - Evaluation and selection.
Code of Federal Regulations, 2014 CFR
2014-01-01
... and educational institutions, including historically black colleges and universities and minority... among U.S. firms, identification of potential markets, appropriateness of business risks. (f) Proposal... business base projections, the market for proposed products, and/or the impact of anticipated product price...
14 CFR 1274.209 - Evaluation and selection.
Code of Federal Regulations, 2012 CFR
2012-01-01
... and educational institutions, including historically black colleges and universities and minority... among U.S. firms, identification of potential markets, appropriateness of business risks. (f) Proposal... business base projections, the market for proposed products, and/or the impact of anticipated product price...
Develop metrics of tire debris on Texas highways : [project summary].
DOT National Transportation Integrated Search
2017-05-01
This research developed metrics on the amount and characteristics of tire debris generated on Texas highways. These metrics provide numerical, data-based rates for districts to anticipate the amounts and characteristics of tire debris and to plan rem...
Salway, Travis; Gesink, Dionne; Ibrahim, Selahadin; Ferlatte, Olivier; Rhodes, Anne E; Brennan, David J; Marchand, Rick; Trussler, Terry
2018-05-01
Gay and bisexual men (GBM) are more likely to attempt suicide than heterosexual men. This disparity is commonly interpreted using minority stress theory; however, specific pathways from antigay stigma to suicidal behavior are poorly understood. We aimed to estimate associations between multiple constructs of stigma and suicide attempts among adult GBM, and to measure the proportion of these associations mediated by distinct suicide risk factors, thus identifying proximal points of intervention. Data were drawn from a Canadian community-based survey of adult GBM. Structural equation modeling was used to compare associations between three latent constructs-enacted stigma (e.g., discrimination, harassment), anticipated prejudice (worry about encountering antigay/bisexual prejudice), and sexuality concealment-and self-reported suicide attempts (last 12 months). Coefficients were estimated for direct, indirect, and total pathways and evaluated based on magnitude and statistical significance. The proportion of associations mediated by depression, drug/alcohol use, and social isolation was calculated using indirect paths. Among 7872 respondents, 3.4% reported a suicide attempt in the past 12 months. The largest total association was observed for enacted stigma, and this association was partially mediated by depression and drug/alcohol use. The total association of anticipated prejudice was relatively smaller and mediated by depression and social isolation. Concealment had an inverse association with suicide attempts as mediated by depression but was also positively associated with suicide attempts when mediated through social isolation. Multiple constructs of antigay stigma were associated with suicide attempts; however, mediating pathways differed by construct, suggesting that a combination of strategies is required to prevent suicide in adult GBM.
24 CFR 941.402 - Project design and construction.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project design and construction... URBAN DEVELOPMENT PUBLIC HOUSING DEVELOPMENT Project Development § 941.402 Project design and.... A PHA may certify that its proposed design and construction plans for the development are in...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-02
... Proposed Information Collection to OMB; Multifamily Project Construction Contract, Building Loan Agreement, & Construction Change; HUD Programs AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY.../borrowers, and mortgagees/lenders for construction of multifamily projects and to obtain approval of changes...
Construction project management handbook.
DOT National Transportation Integrated Search
2012-03-01
The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...
Monitoring Environmental Performance Commitments in Construction Projects.
DOT National Transportation Integrated Search
2007-05-01
EPCs are measures implemented during project construction to reduce environmental impacts. These commitments are directed toward the Projects performance period only and focus primarily on reducing the impacts of construction equipment and trucks....
Life Cycle Inventory (LCI) Data-Treatment Chemicals ...
This report estimates environmental emission factors (EmF) for key chemicals, construction and treatment materials, transportation/on-site equipment, and other processes used at remediation sites. The basis for chemical, construction, and treatment material EmFs is life cycle inventory (LCI) data extracted from secondary data sources and compiled using the openLCA software package. The US EPA MOVES 2014 model was used to derive EmFs from combustion profiles for a number of transportation and on-site equipment processes. The EmFs were calculated for use in US EPA’s Spreadsheets for Environmental Footprint Analysis (SEFA). EmFs are reported for cumulative energy demand (CED), global warming potential (GWP), criteria pollutants (e.g. NOX, SOX, and PM10), hazardous air pollutants (HAPs), and water use. Since the USEPA launched its green remediation program, metrics such as impacts, outcomes, and environmental burdens of remediation actions have been difficult to assess. This research includes metrics to quantify RCRA and CERCLA remediation actions. Metrics include: greenhouse gases, energy demand, water use, SOX, NOX, PM10, and hazardous air pollutants. The primary user of this project is EPA's Region 9 Superfund and Technology Office for input into the SEFA tool. SEFA is a set of analytical workbooks used to quantify the environmental footprint of a site cleanup in order to achieve a greener cleanup. SEFA permits users to enter actual or anticipated data on site
Penstock leakage at the Robert Moses Niagara Power Plant - Investigation, design, and construction
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dumont, M.F.; Baker, C.H.; Broderick, W.
1995-12-31
This paper describes an investigation of observed penstock leakage and related gallery flooding at the Robert Moses Niagara Power Plant, in Lewiston, New York; engineering design of alternative remediation measures; test grouting of a dewatered penstock in 1991; and the subsequent grouting of the remaining twelve penstocks. The Robert Moses Niagara Power Plant is the lower part of the Niagara Pumped Storage Project, which is owned and operated by the New York Power Authority. Water diverted some 4 miles (6.4 km) upstream of the plant is passed through 13 individual penstocks 28 ft (8.5 m) in diameter to a powermore » plant on the right bank of the Niagara River. The net head at the plant is 300 ft (91.4 m), and the hydraulic capacity is about 91,000 cfs (2,575 m{sup 3}/s). The total installed capacity is about 2,000 MW. Since completion of construction in 1962 there had been recurring problems with flooding of the floors at the upper intake galleries. This was particularly noticeable during periods of heavy rainfall when the existing storm drains were close to their design capacity. The paper presents details of the investigations, including penstock inspection, methods of flow measurement and analysis, design criteria for the grout selected, details of the drilling and grout placement, and the anticipated long-term performance of the grout in service.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Steve McRae; Thomas Walsh; Michael Dunn
2010-02-22
In November of 2008, the Department of Energy (DOE) and the North Slope Borough (NSB) committed funding to develop a drilling plan to test the presence of hydrates in the producing formation of at least one of the Barrow Gas Fields, and to develop a production surveillance plan to monitor the behavior of hydrates as dissociation occurs. This drilling and surveillance plan was supported by earlier studies in Phase 1 of the project, including hydrate stability zone modeling, material balance modeling, and full-field history-matched reservoir simulation, all of which support the presence of methane hydrate in association with the Barrowmore » Gas Fields. This Phase 2 of the project, conducted over the past twelve months focused on selecting an optimal location for a hydrate test well; design of a logistics, drilling, completion and testing plan; and estimating costs for the activities. As originally proposed, the project was anticipated to benefit from industry activity in northwest Alaska, with opportunities to share equipment, personnel, services and mobilization and demobilization costs with one of the then-active exploration operators. The activity level dropped off, and this benefit evaporated, although plans for drilling of development wells in the BGF's matured, offering significant synergies and cost savings over a remote stand-alone drilling project. An optimal well location was chosen at the East Barrow No.18 well pad, and a vertical pilot/monitoring well and horizontal production test/surveillance well were engineered for drilling from this location. Both wells were designed with Distributed Temperature Survey (DTS) apparatus for monitoring of the hydrate-free gas interface. Once project scope was developed, a procurement process was implemented to engage the necessary service and equipment providers, and finalize project cost estimates. Based on cost proposals from vendors, total project estimated cost is $17.88 million dollars, inclusive of design work, permitting, barging, ice road/pad construction, drilling, completion, tie-in, long-term production testing and surveillance, data analysis and technology transfer. The PRA project team and North Slope have recommended moving forward to the execution phase of this project.« less
NASA Astrophysics Data System (ADS)
Krechowicz, Maria
2017-10-01
Nowadays, one of the characteristic features of construction industry is an increased complexity of a growing number of projects. Almost each construction project is unique, has its project-specific purpose, its own project structural complexity, owner’s expectations, ground conditions unique to a certain location, and its own dynamics. Failure costs and costs resulting from unforeseen problems in complex construction projects are very high. Project complexity drivers pose many vulnerabilities to a successful completion of a number of projects. This paper discusses the process of effective risk management in complex construction projects in which renewable energy sources were used, on the example of the realization phase of the ENERGIS teaching-laboratory building, from the point of view of DORBUD S.A., its general contractor. This paper suggests a new approach to risk management for complex construction projects in which renewable energy sources were applied. The risk management process was divided into six stages: gathering information, identification of the top, critical project risks resulting from the project complexity, construction of the fault tree for each top, critical risks, logical analysis of the fault tree, quantitative risk assessment applying fuzzy logic and development of risk response strategy. A new methodology for the qualitative and quantitative risk assessment for top, critical risks in complex construction projects was developed. Risk assessment was carried out applying Fuzzy Fault Tree analysis on the example of one top critical risk. Application of the Fuzzy sets theory to the proposed model allowed to decrease uncertainty and eliminate problems with gaining the crisp values of the basic events probability, common during expert risk assessment with the objective to give the exact risk score of each unwanted event probability.
41 CFR 102-74.135 - Who selects construction and alteration projects that are to be performed?
Code of Federal Regulations, 2010 CFR
2010-07-01
... and alteration projects that are to be performed? 102-74.135 Section 102-74.135 Public Contracts and... construction and alteration projects that are to be performed? The Administrator of General Services selects construction and alteration projects to be performed. ...
Construction project management handbook : September 2009.
DOT National Transportation Integrated Search
2009-09-01
The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...
Measuring Psychological Capital: Construction and Validation of the Compound PsyCap Scale (CPC-12)
Lorenz, Timo; Beer, Clemens; Pütz, Jan; Heinitz, Kathrin
2016-01-01
With the Psychological Capital Questionnaire (PCQ) being the standard measure to assess psychological capital (PsyCap) in the context of organizations, this paper aims to broaden this domain-specific approach by introducing a measure with universal claim. Two studies were conducted to create and validate a German self-report scale (CPC-12) measuring PsyCap. We performed confirmatory factor analyses and correlations with other positive psychological constructs on the data of two German samples (N1 = 321; N2 = 202). The twelve-item CPC-12 exhibits the anticipated factorial structure with a very good model fit and associations to other constructs concur with previous findings with other measures of PsyCap. PMID:27035437
ERIC Educational Resources Information Center
Argon, Joe, Ed.; Spoor, Dana L.; Cox, Susan M.; Brown, Andrew; Ray, Jennifer
1998-01-01
Presents a series of articles that examine decision making in school construction and renovation projects. Topics include preparing for a construction project, purchasing windows that provide protection at a reasonable cost, choosing the best flooring and carpeting, and dealing with deregulation. An industry roundtable discussion on project…
14 CFR 151.47 - Performance of construction work: Letting of contracts.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...
14 CFR 151.47 - Performance of construction work: Letting of contracts.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...
14 CFR 151.47 - Performance of construction work: Letting of contracts.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...
14 CFR 151.47 - Performance of construction work: Letting of contracts.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...
7 CFR 3015.113 - Programmatic changes.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER... project than was anticipated when the award was made. (d) Transferring work and providing financial... performance of the substantive programmatic work, and for providing any form of financial assistance to...
DESIGN AND PROTOTYPE OF A SUSTAINABLE EGG-WASHER
This project is part of the senior design course for Engineering Science and Mechanics at Virginia Tech. Anticipated results will be a working prototype chosen from multiple designs. We will include test results supporting our selection. We will characterize the stresses ex...
7 CFR 275.19 - Monitoring and evaluation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action § 275.19... Project Area/Management Unit Corrective Action Plan is implemented and achieves the anticipated results...
FY 2016 and FY 2017 Request for Proposals for the Source Reduction Assistance Grant Program
EPA is announcing the availability of SRA grants and/or cooperative agreements to fund projects supporting p2/source reduction and resource conservation; it is anticipated up to $2,200,000 will be available collectively.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Section 342.7101-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT... information that a contractor's accumulated cost and projected expenditures will exceed the limit of funds... receives information from a source other than the contractor that a cost overrun is anticipated, the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... Section 342.7101-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT... information that a contractor's accumulated cost and projected expenditures will exceed the limit of funds... receives information from a source other than the contractor that a cost overrun is anticipated, the...
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 342.7101-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT... information that a contractor's accumulated cost and projected expenditures will exceed the limit of funds... receives information from a source other than the contractor that a cost overrun is anticipated, the...
Code of Federal Regulations, 2013 CFR
2013-10-01
... Section 342.7101-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT... information that a contractor's accumulated cost and projected expenditures will exceed the limit of funds... receives information from a source other than the contractor that a cost overrun is anticipated, the...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 342.7101-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT... information that a contractor's accumulated cost and projected expenditures will exceed the limit of funds... receives information from a source other than the contractor that a cost overrun is anticipated, the...
Electronic construction collaboration system -- final phase : [tech transfer summary].
DOT National Transportation Integrated Search
2014-07-01
Construction projects have been growing more complex in terms of : project team composition, design aspects, and construction processes. : To help manage the shop/working drawings and requests for information : (RFIs) for its large, complex projects,...
Enhancements to highway construction scheduling expert system.
DOT National Transportation Integrated Search
2015-05-01
This research was performed to enhance the software tool (Illinois Construction Scheduling Expert : System, ICSES) developed in Phase I of this project (ICT project R27-86) by mining data collected on : IDOT construction projects and differentiating ...
City of Las Vegas Plug-in Hybrid Electric Vehicle Demonstration Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2013-12-31
The City of Las Vegas was awarded Department of Energy (DOE) project funding in 2009, for the City of Las Vegas Plug-in Hybrid Electric Vehicle Demonstration Program. This project allowed the City of Las Vegas to purchase electric and plug-in hybrid electric vehicles and associated electric vehicle charging infrastructure. The City anticipated the electric vehicles having lower overall operating costs and emissions similar to traditional and hybrid vehicles.
van Reedt Dortland, Maartje; Dewulf, Geert; Voordijk, Hans
2013-01-01
Exploring the impact of the type of project coalition on types of flexibility by analyzing considered and exercised flexibilities in separated and integrated project coalitions in the design and construction phase and the operations and maintenance phase of a healthcare construction project. Flexibility in healthcare construction projects is increasingly needed in order to deal with growing uncertainties. Until now, little research has been carried out on how and to what extent flexibility is incorporated in different types of project coalitions chosen by healthcare organizations. An exploratory survey was conducted among health organizations in both cure and care. Questions were asked on the position of the real estate department within the organization, the type of project coalitions chosen and the rationale behind this choice, and the extent to which flexibility in terms of a real option was considered and to what extent it had been exercised in a project coalition. Integrated project coalitions pay more attention to flexibility in advance in both the process and the product, but exercise them to a lesser extent than separated project coalitions. The economic feasibility of real options is higher in integrated project coalitions. The study shows that real options thinking is already incorporated in real estate management of healthcare organizations, although more flexibility is considered in advance of the project than is actually realized during and after construction. Built environment, construction, decision making, hospitals, planning.
Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project
NASA Astrophysics Data System (ADS)
Bizon-Górecka, Jadwiga; Górecki, Jarosław
2017-10-01
The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of measures of the goals. It is crucial to identify the stakeholders, whereas it is a continuous and quite difficult process. However, when ignoring the impact of specific stakeholders on the implementation of the project, a duration of the project and its costs may increase. A main problem, in establishing a relationship of participants in the construction process, is to take into account the risk of all project stakeholders.
Leveraging Text Content for Management of Construction Project Documents
ERIC Educational Resources Information Center
Alqady, Mohammed
2012-01-01
The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Linkskov, K.L.
1986-01-01
The impact of anticipated coal mining in Utah on the salinity of the Price, San Rafael, and Green Rivers is to be addressed in the repermitting of existing mines and permitting of new mines. To determine the potential impacts, mathematical models were developed for the Price and San Rafael River basins. Little impact on the quantity and quality of streamflow is expected for the Price and San Rafael Rivers. The increase in mean monthly flow of the Price River downstream from Scofield Reservoir is projected as 3.5 cu ft/sec, ranging from 1.7% in June to 140% in February. At themore » mouth of the Price River, the potential increase in mean monthly flow is projected as 12.6 cu ft/sec, ranging from 3.7% in May to 37.7% in January. The potential changes in dissolved solids concentration would range from a 20.7% decrease in January to a 1.3% increase in June. At the mouth of the San Rafael River, the potential increase in mean monthly flow ranges from 2.9 cu ft/sec in February to 6.7 cu ft/sec in May, with the increase ranging from 0.8% in June to 12.6% in November. The potential changes in dissolved solids concentration would range from a 5.3% decrease in March to a 0.6% increase in May. The anticipated mining in the Price and San Rafael River basins is not expected to cause a detectable change in the quantity and quality of streamflow in the Green River. The projected peak increase in flow resulting from discharge from the mines is less than 0.3% of the average flow in the Green River. 18 refs., 6 figs., 17 tabs.« less
Using mobile computers to automate the inspection process for highway construction projects.
DOT National Transportation Integrated Search
2013-12-01
Highway construction projects are characterized by the large amount of data that needs to be collected, processed, and exchanged among the : different project participants. Collection of construction inspection data, in particular, allows field perso...
Evaluation of recycled projects for performance : final report.
DOT National Transportation Integrated Search
1995-04-01
Louisiana constructed two hot mix recycling projects in 1978 in order to determine the feasibility of this technology with respect to design and construction. In 1980-81 four recycled projects were constructed to examine the variations found in recyc...
Bonded concrete overlay performance in Illinois
DOT National Transportation Integrated Search
2002-04-01
Two bonded concrete overlay rehabilitation projects were constructed in Illinois during the 1990's. The first project was constructed in 1994 and 1995 on Interstate 80, east of Moline. The second project was constructed in 1996 on Interstate 88 near ...
Digital imaging technology assessment: Digital document storage project
NASA Technical Reports Server (NTRS)
1989-01-01
An ongoing technical assessment and requirements definition project is examining the potential role of digital imaging technology at NASA's STI facility. The focus is on the basic components of imaging technology in today's marketplace as well as the components anticipated in the near future. Presented is a requirement specification for a prototype project, an initial examination of current image processing at the STI facility, and an initial summary of image processing projects at other sites. Operational imaging systems incorporate scanners, optical storage, high resolution monitors, processing nodes, magnetic storage, jukeboxes, specialized boards, optical character recognition gear, pixel addressable printers, communications, and complex software processes.
NASA Astrophysics Data System (ADS)
Venkrbec, Vaclav; Bittnerova, Lucie
2017-12-01
Building information modeling (BIM) can support effectiveness during many activities in the AEC industry. even when processing a construction-technological project. This paper presents an approach how to use building information model in higher education, especially during the work on diploma thesis and it supervision. Diploma thesis is project based work, which aims to compile a construction-technological project for a selected construction. The paper describes the use of input data, working with them and compares this process with standard input data such as printed design documentation. The effectiveness of using the building information model as a input data for construction-technological project is described in the conclusion.
Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan
NASA Astrophysics Data System (ADS)
Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh
2017-10-01
Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.
ERIC Educational Resources Information Center
Brady, Laura Thompson; Fong, Lisa; Waninger, Kendra N.; Eidelman, Steven
2009-01-01
As leaders from the Baby Boomer generation prepare for retirement over the next decade, emerging leaders must be identified and supported in anticipation of a major organizational transition. "Authentic leadership" is a construct that informs the development of values-driven leaders who will bring organizations into the future, just as the…
26 CFR 1.103-7 - Industrial development bonds.
Code of Federal Regulations, 2012 CFR
2012-04-01
... G issues its obligations to finance the construction of a municipal auditorium which it will own and operate. The use of the auditorium will be open to anyone who wishes to use it for a short period of time... the full legal possessory interests of a lessee. It is anticipated that the auditorium will be used by...
26 CFR 1.103-7 - Industrial development bonds.
Code of Federal Regulations, 2014 CFR
2014-04-01
... G issues its obligations to finance the construction of a municipal auditorium which it will own and operate. The use of the auditorium will be open to anyone who wishes to use it for a short period of time... the full legal possessory interests of a lessee. It is anticipated that the auditorium will be used by...
26 CFR 1.103-7 - Industrial development bonds.
Code of Federal Regulations, 2010 CFR
2010-04-01
... G issues its obligations to finance the construction of a municipal auditorium which it will own and operate. The use of the auditorium will be open to anyone who wishes to use it for a short period of time... the full legal possessory interests of a lessee. It is anticipated that the auditorium will be used by...
26 CFR 1.103-7 - Industrial development bonds.
Code of Federal Regulations, 2011 CFR
2011-04-01
... G issues its obligations to finance the construction of a municipal auditorium which it will own and operate. The use of the auditorium will be open to anyone who wishes to use it for a short period of time... the full legal possessory interests of a lessee. It is anticipated that the auditorium will be used by...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-02
... construction, operation, and maintenance of a wind energy facility up to 160 megawatt (MW). The EIS will... Reservation. The proposed facility is anticipated to be comprised of between 53 and 106 wind turbines with a... of wind turbine). The facility would include: turbines anchored to concrete foundations approximately...
14 CFR § 1260.125 - Revision of budget and program plans.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., A-110 and A-122 to allow recipients to do the following: (1) Incur pre-award costs 90 calendar days... reason the recipient does not receive an award or if the award is less than anticipated and inadequate to... construction awards, recipients shall request prior written approval promptly from NASA for budget revisions...
Doing the Best You Can: A Study of Values in a Group of Nun Educators
ERIC Educational Resources Information Center
Hogard, Elaine
2004-01-01
A group of experienced and well-qualified nun educators were interviewed regarding their experiences and values. A recurrent phrase occurring in the interviews was "Doing the best you can". This phrase served to both justify and anticipate statements. A questionnaire was constructed to encourage elaboration of the phrase and to detect…
The "Europeanisation" of Othering: Children Using "Europe" to Construct "Others" in Cyprus
ERIC Educational Resources Information Center
Philippou, Stavroula; Theodorou, Eleni
2014-01-01
The accession of the Republic of Cyprus to the European Union in 2004 was anticipated to be a "catalytic" factor in developments towards a solution of the Cyprus problem at the political level. Within education, it was also seen as an opportunity for addressing diversity in a historically ethnocentric educational system through the…
The Wishing Crystal: Joint Construction in the Junior-Primary Classroom. PEN.
ERIC Educational Resources Information Center
Parkin, Bronwyn
When children begin school many of them do not anticipate the grammatical patterns and word choices that accompany written language, and which make written language so different from spoken language. It is for this reason that young students need varying degrees of scaffolding--teacher and peer support that enables them to gain increasing control…
ERIC Educational Resources Information Center
Murphy, Mary; Zirkel, Sabrina
2015-01-01
Background/Context: A sense of belonging in school is a complex construct that relies heavily on students' perceptions of the educational environment, especially their relationships with other students. Some research suggests that a sense of belonging in school is important to all students. However, we argue that the nature and meaning of…
The Impact of FTP on Commitment to Career Choices: Situating within a Social Cognitive Perspective
ERIC Educational Resources Information Center
Phan, Huy P.
2015-01-01
Future time perspective (FTP) is an important theoretical construct that may assist educators in their understanding of individuals' learning, motivation and decision-making. There is empirical evidence attesting to the predictive effects of anticipation of future goals on both cognitive and non-cognitive outcomes. The present study, based on…
Clarke Central High School: One Student at a Time
ERIC Educational Resources Information Center
Principal Leadership, 2013
2013-01-01
There is excitement in the air at Clarke Central High School in anticipation of a $28 million renovation planned on its 27-acre, urban campus located just minutes from the University of Georgia in Athens. This extensive construction aims to fulfill a board of education mandate to provide equity among the Clarke County school facilities and will…
NASA Astrophysics Data System (ADS)
Chaumont, Diane; Huard, David; Logan, Travis; Sottile, Marie-France; Brown, Ross; Gauvin St-Denis, Blaise; Grenier, Patrick; Braun, Marco
2013-04-01
Planning and adapting to a changing climate requires credible information about the magnitude and rate of projected changes. Ouranos, a consortium on regional climatology and adaptation to climate change was launched in the Province of Québec, Canada, ten years ago, with the objective of developing and providing climate information and expertise in support to adaption. Ouranos differs from most other climate service centers by integrating climate modeling activities, impacts and adaptation expertise and climate analysis services under one roof. The Climate Scenarios Group operates at the interface between climate modellers and users and is responsible for developing, producing and communicating climate scenarios to end-users in a consistent manner. This process requires close collaboration with users to define, understand and eventually anticipate their needs. The varied scientific expertise of climate scenarios specialists --who also act as communicators-- has proven to be a key element for successful communication. A large amount of effort is spent on the characterization and communication of the uncertainties involved in scenario construction. Two main activities have been put in place by the experts in climate modeling to address this: (1) a training course on climate models and (2) a fact-sheet summarizing the uncertainty and robustness of the climate change scenario provided for each I&A application. The latter tool ensures the transparency, traceability, and accountability of our products, and at the same time, encourages a sense of shared responsibility for the final choice of climate scenarios. In addition to uncertainty, two other main issues have been identified as essential in communication with users: 1) observed natural variability at relevant scales and 2) reconciliation of the projected trend with the recent observed trend. Our group has devoted substantial resources for the advancement of communication with end-users in these particular areas. This presentation will provide an overview of progress in communicating climate information at the Ouranos Consortium. We will discuss success and failures and future plans, in particular the extent to which Ouranos needs to work with users in decision-making activities.
Efficient Project Delivery Using Lean Principles - An Indian Case Study
NASA Astrophysics Data System (ADS)
Kovvuri, P. Ramachandra Reddy; Sawhney, Anil; Ahuja, Ritu; Sreekumar, Aiswarya
2016-03-01
Construction industry in India is growing at a rapid pace. Along with this growth, the industry is facing numerous challenges that are making delivery of projects inefficient. Experts believe that capacity constraints in the industry need to be addressed immediately. Government has recommended `introduction of efficient technologies and modern management techniques' to increase the productivity of the industry. In this context, lean principles can act as a lever to make project delivery more efficient and provide the much needed impetus to the Indian construction sector. Around the globe lean principles are showing positive results on the projects. Project teams are reporting improvements in construction time, cost and quality along with softer benefits of enhanced collaboration, coordination and trust in project teams. Can adoption of lean principles provide similar benefits in the Indian construction sector? This research was conducted to answer this question. Using an action research approach a key lean construction tool called Last Planner System (LPS) was tested on a large Indian construction project. The work described in this work investigates the improvements achieved in project delivery by adopting LPS in Indian construction sector. Comparison in pre- and post-implementation data demonstrates increase in the certainty of work-flow and improves schedule compliance. This is measured through a simple LPS metric called percent plan complete. Explicit improvements in schedule performance are seen during 8 week LPS implementation along with implicit improvements in coordination, collaboration and trust in the project team. This work reports the findings of LPS implementation on the case study project outlining the barriers and drivers to adoption, strategies needed to ensure successful implementation and roadmap for implementation. Based on the findings the authors envision that lean construction can make project delivery more efficient in India.
Infection control in design and construction work.
Collinge, William H
2015-01-01
To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice. © The Author(s) 2015.
NASA Astrophysics Data System (ADS)
Kline, Jeffrey D.; Moses, Alissa; Burcsu, Theresa
2010-05-01
Forest policymakers, public lands managers, and scientists in the Pacific Northwest (USA) seek ways to evaluate the landscape-level effects of policies and management through the multidisciplinary development and application of spatially explicit methods and models. The Interagency Mapping and Analysis Project (IMAP) is an ongoing effort to generate landscape-wide vegetation data and models to evaluate the integrated effects of disturbances and management activities on natural resource conditions in Oregon and Washington (USA). In this initial analysis, we characterized the spatial distribution of forest and range land development in a four-county pilot study region in central Oregon. The empirical model describes the spatial distribution of buildings and new building construction as a function of population growth, existing development, topography, land-use zoning, and other factors. We used the model to create geographic information system maps of likely future development based on human population projections to inform complementary landscape analyses underway involving vegetation, habitat, and wildfire interactions. In an example application, we use the model and resulting maps to show the potential impacts of future forest and range land development on mule deer ( Odocoileus hemionus) winter range. Results indicate significant development encroachment and habitat loss already in 2000 with development located along key migration routes and increasing through the projection period to 2040. The example application illustrates a simple way for policymakers and public lands managers to combine existing data and preliminary model outputs to begin to consider the potential effects of development on future landscape conditions.
78 FR 16647 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-18
..., NASS anticipates the benefit of increased response rates through improved survey design, a goal tied... number. National Agricultural Statistics Service Title: Generic Clearance of Survey Improvement Projects... topics designed to improve NASS' data collection on agriculture. Need and Use of the Information: NASS...
ERIC Educational Resources Information Center
Hay, Tina M.
1991-01-01
College and university public relations officials need to be aware of the potential problems associated with institutional research programs using animals and conflicts with animal welfare activists. Steps to take include anticipating and planning for a crisis, knowing campus research projects, and educating the various constituencies affected,…
DOT National Transportation Integrated Search
2010-02-26
In anticipation of developing pavement performance models as part of a proposed pavement management : system, the Pennsylvania Department of Transportation (PennDOT) initiated a study in 2009 to investigate : performance modeling activities and condi...
Design of the Long-term Waste Management Facility for Historic LLRW Port Hope Project - 13322
DOE Office of Scientific and Technical Information (OSTI.GOV)
Campbell, Don; Barton, David; Case, Glenn
2013-07-01
The Municipality of Port Hope is located on the northern shores of Lake Ontario approximately 100 km east of Toronto, Ontario, Canada. Starting in the 1930's, radium and later uranium processing by Eldorado Gold Mines Limited (subsequently Eldorado Nuclear Limited) (Eldorado) at their refinery in Port Hope resulted in the generation of process residues and wastes that were disposed of indiscriminately throughout the Municipality until about the mid-1950's. These process residues contained radium (Ra- 226), uranium, arsenic and other contaminants. Between 1944 and 1988, Eldorado was a Federal Crown Corporation, and as such, the Canadian Federal Government has assumed responsibilitymore » for the clean-up and long-term management of the historic waste produced by Eldorado during this period. The Port Hope Project involves the construction and development of a new long-term waste management facility (LTWMF), and the remediation and transfer of the historic wastes located within the Municipality of Port Hope to the new LTWMF. The new LTWMF will consist of an engineered above-ground containment mound designed to contain and isolate the wastes from the surrounding environment for the next several hundred years. The design of the engineered containment mound consists of a primary and secondary composite base liner system and composite final cover system, made up of both natural materials (e.g., compacted clay, granular materials) and synthetic materials (e.g., geo-synthetic clay liner, geo-membrane, geo-textiles). The engineered containment mound will cover an area of approximately 13 hectares and will contain the estimated 1.2 million cubic metres of waste that will be generated from the remedial activities within Port Hope. The LTWMF will also include infrastructure and support facilities such as access roads, administrative offices, laboratory, equipment and personnel decontamination facilities, waste water treatment plant and other ancillary facilities. Preliminary construction activities for the Port Hope LTWMF commenced in 2012 and are scheduled to continue over the next few years. The first cell of the engineered containment mound is scheduled to be constructed in 2015 with waste placement into the Port Hope LTWMF anticipated over the following seven year period. (authors)« less
Thompson, Heather; Legorreta, Kimberly; Maher, Mary Ann; Lavin, Melanie M
Our health system recognized the need to update facility space and associated technology for the labor and birth unit within our large volume perinatal service to improve the patient experience, and enhance safety, quality of care, and staff satisfaction. When an organization decides to invest $30 million dollars in a construction project such as a new labor and birth unit, many factors and considerations are involved. Financial support, planning, design, and construction phases of building a new unit are complex and therefore require strong interdisciplinary collaboration, leadership, and project management. The new labor and birth unit required nearly 3 years of planning, designing, and construction. Patient and family preferences were elicited through consumer focus groups. Multiple meetings with the administrative and nursing leadership teams, staff nurses, nurse midwives, and physicians were held to generate ideas for improvement in the new space. Involving frontline clinicians and childbearing women in the process was critical to success. The labor and birth unit moved to a new patient tower in a space that was doubled in square footage and geographically now on three separate floors. In the 6 months prior to the move, many efforts were made in our community to share our new space. The marketing strategy was very detailed and creative with ongoing input from the nursing leadership team. The nursing staff was involved in every step along the way. It was critical to have champions as workflow teams emerged. We hosted simulation drills and tested scenarios with new workflows. Move day was rehearsed with representatives of all members of the perinatal team participating. These efforts ultimately resulted in a move time of ~5 hours. Birth volumes increased 7% within the first 6 months. After 3 years in our new space, our birth volumes have risen nearly 15% and are still growing. Key processes and roles responsible for a successful build, efficient and safe move day, and optimal operational utility, as anticipated, of a new labor and birth unit in a large volume perinatal service are detailed.
NASA Astrophysics Data System (ADS)
Low, W. W.; Wong, K. S.; Lee, J. L.
2018-04-01
With the growth of economy and population, there is an increase in infrastructure construction projects. As such, it is unavoidable to have construction projects on soft soil. Without proper risk management plan, construction projects are vulnerable to different types of risks which will have negative impact on project’s time, cost and quality. Literature review showed that little or none of the research is focused on the risk assessment on the infrastructure project in soft soil. Hence, the aim of this research is to propose a risk assessment framework in infrastructure projects in soft soil during the construction stage. This research was focused on the impact of risks on project time and internal risk factors. The research method was Analytical Hierarchy Process and the sample population was experienced industry experts who have experience in infrastructure projects. Analysis was completed and result showed that for internal factors, the five most significant risks on time element are lack of special equipment, potential contractual disputes and claims, shortage of skilled workers, delay/lack of materials supply, and insolvency of contractor/sub-contractor. Results indicated that resources risk factor play a critical role on project time frame in infrastructure projects in soft soil during the construction stage.
Code of Federal Regulations, 2014 CFR
2014-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2010 CFR
2010-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2011 CFR
2011-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2012 CFR
2012-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2013 CFR
2013-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Risks Associated with Federal Construction Projects
2011-06-01
awarding contracts for construction projects (USACE, 2010). BIM offers a method to effectively design a facility while maximizing work performance during...includes Requirements, Programming, Funding, Solicitation, AEC Evaluation, Award , Project Validation, Design and Construction, and Project Management...includes the Solicitation, AEC Evaluation, and Award Steps. In this Phase, BIM is only used in the Solicitation and the AEC Evaluation steps
NASA Astrophysics Data System (ADS)
Vaynshtok, Natalia
2017-10-01
The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.
The role of the physical environment in crossing the quality chasm.
Henriksen, Kerm; Isaacson, Sandi; Sadler, Blair L; Zimring, Craig M
2007-11-01
Evidence-based design findings are available to help inform hospital decision makers of opportunities for ensuring that quality and safety are designed into new and refurbished facilities. The Institute of Medicine's six quality aims of patient centeredness, safety, effectiveness, efficiency, timeliness, and equity provide an organizing framework for introducing a representative portion of the evidence. Design improvements include single-bed and variable-acuity rooms; electronic access to medical records; greater accommodation for families and visitors; handrails to prevent patient falls; standardization (room layout, equipment, and supplies for improved efficiencies); improved work process flow to reduce delays and wait times; and better assessment of changing demographics, disease conditions, and community needs for appropriately targeted health care services. A recent analysis of the business case suggests that a slight, one-time incremental cost for ensuring safety and quality would be paid back in two to three years in the form of operational savings and increased revenues. Hospitals leaders anticipating new construction projects should take advantage of evidence-based design findings that have the potential of raising the quality of acute care for decades to come.
An archival examination of environment and disease in eastern Africa in recent history
NASA Astrophysics Data System (ADS)
Larsen, L.
2012-04-01
In order to better understand present interactions between climate and infectious disease incidence it is important to examine the history of disease outbreaks and burdens, and their likely links with the environment. This paper will present research that is currently being undertaken on the identification and mapping of historic incidences of malaria, schistosomiasis and Rift Valley fever (RVF) in eastern Africa in relation to possible environmental, social, economic and political contributing factors. The research covers the past one hundred years or so and primarily draws on a range of archival documentary sources located in the region and the former imperial centres. The paper will discuss the methodologies employed in the building of a comprehensive historical database. The research is part of a larger EU FP7-funded project which aims to map, examine and anticipate the future risks of the three diseases in eastern Africa in response to environmental change. The paper will outline how the construction of such a historic database allows the contextualization of current climate-disease relationships and can thus contribute to discussions on the effects of changing climate on future disease trends.
Zhang, Tao; Wei, Dong-Qing; Chou, Kuo-Chen
2012-03-01
Comparative molecular field analysis (CoMFA) is a widely used 3D-QSAR method by which we can investigate the potential relation between biological activity of compounds and their structural features. In this study, a new application of this approach is presented by combining the molecular modeling with a new developed pharmacophore model specific to CYP1A2 active site. During constructing the model, we used the molecular dynamics simulation and molecular docking method to select the sensible binding conformations for 17 CYP1A2 substrates based on the experimental data. Subsequently, the results obtained via the alignment of binding conformations of substrates were projected onto the active- site residues, upon which a simple blueprint of active site was produced. It was validated by the experimental and computational results that the model did exhibit the high degree of rationality and provide useful insights into the substrate binding. It is anticipated that our approach can be extended to investigate the protein-ligand interactions for many other enzyme-catalyzed systems as well.
Status of the Milan superconducting cyclotron project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Acerbi, E.
1983-08-01
This paper presents an updated status report on the Superconducting Cyclotron, under construction at the University of Milan during the past two years, with funding chiefly provided by the Italian National Institute for Nuclear Physics. The cyclotron is designed for a K of 800 and a K /SUB FOC/ of 200 and thus yields maximum energies of 100 MeV/n for fully stripped light ions and 20 MeV/n for uranium and other heavy ions. The pole radius is 90 cm with three sectors having an average spiral constant of 1/45.7 rad/cm. The average magnetic field will span between 22 and 48more » K Gauss with a corresponding R.F. frequency range between 15 and 48 MHz. The anticipated peak dee voltage is 100 KV with harmonic operation from h = 1 to h = 4. The operating modes include the use of an internal PIG source, injection from a 16 MV tandem, and axial injection from an external ion source. This paper presents the design parameters and outlines the progress made so far.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-21
... Construction Contract, Building Loan Agreement, & Construction Change Request AGENCY: Office of the Chief... Information Collection Title of Information Collection: Multifamily Project Construction Contract, Building Loan Agreement, & Construction Change Request. OMB Approval Number: 2502-0011. Type of Request...
Code of Federal Regulations, 2010 CFR
2010-10-01
... FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and... authority, or public or quasi-public corporation for a project described in paragraph (b) of this section.... (b) Eligible project. A grant under section 1625 may be made only for a construction and/or...
Study of Collaborative Management for Transportation Construction Project Based on BIM Technology
NASA Astrophysics Data System (ADS)
Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng
2018-03-01
Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.
Effective factor of virtual team: Resolving communication breakdown in IBS construction project
NASA Astrophysics Data System (ADS)
Pozin, Mohd Affendi Ahmad; Nawi, Mohd. Nasrun Mohd.
2016-08-01
Currently, rapid development of information technology has provided new opportunities to organisation toward increasing the effectiveness of collaboration and teamwork management. Thus the virtual team approach has been implemented in numerous of field. However, there is limited study of virtual team in construction project management. Currently IBS project is still based on traditional construction process which is isolation team working environment. Therefore this approach has been declared as a main barrier to ensure cooperative working relation in term of communication and information in between project stakeholders. Thus, this paper through literature review is attempted to present a discussion of the virtual team approach toward IBS project in developing effective team communication during construction project.
Interpretation bias and anxiety in childhood: stability, specificity and longitudinal associations.
Creswell, Cathy; O'Connor, Thomas G
2011-03-01
Biases in the interpretation of ambiguous material are central to cognitive models of anxiety; however, understanding of the association between interpretation and anxiety in childhood is limited. To address this, a prospective investigation of the stability and specificity of anxious cognitions and anxiety and the relationship between these factors was conducted. Sixty-five children (10-11 years) from a community sample completed measures of self-reported anxiety, depression, and conduct problems, and responded to ambiguous stories at three time points over one-year. Individual differences in biases in interpretation of ambiguity (specifically "anticipated distress" and "threat interpretation") were stable over time. Furthermore, anticipated distress and threat interpretation were specifically associated with anxiety symptoms. Distress anticipation predicted change in anxiety symptoms over time. In contrast, anxiety scores predicted change in threat interpretation over time. The results suggest that different cognitive constructs may show different longitudinal links with anxiety. These preliminary findings extend research and theory on anxious cognitions and their link with anxiety in children, and suggest that these cognitive processes may be valuable targets for assessment and intervention.
Towards a List of Molecules as Potential Biosignature Gases for the Search for Life on Exoplanets
NASA Astrophysics Data System (ADS)
Seager, Sara; Bains, William; Petkowski, Janusz
2015-12-01
Thousands of exoplanets are known to orbit nearby stars. Plans for the next generation of space-based and ground-based telescopes are fueling the anticipation that a precious few habitable planets can be identified in the coming decade. Even more highly anticipated is the chance to find signs of life on these habitable planets by way of biosignature gases. But which gases should we search for? We expand on the search of possible biosignature gases and go beyond those studied so far, which include O2, O3, N2O, and CH4, as well as secondary metabolites: methanethiol (CH3SH), dimethyl sulfide ((CH3)2S), methyl chloride (CH3Cl), and carbonyl sulfide (CSO).We present the results of a project to map the chemical space of life’s metabolic products. We have constructed a systematic survey of all possible stable volatile molecules (up to N=6 non-H atoms), and identified those made by life on Earth. Some (such as methyl chloride) are made by Earth life in sufficiently substantial quantities to be candidate biosignatures in an Earth-like exoplanet’s atmosphere; some, such as stibine (SbH3), are produced only in trace amounts. Some entire categories of molecules are not made by Earth life (such as the silanes); these and other absences from the list of biogenic volatiles point to functional patterns in biochemical space. Such patterns may be different for different biochemistry, and so we cannot rule out any small, stable molecule as a candidate biosignature gas. Our goal is for the community to use the list to study the chemicals that might be potential biosignature gases on exoplanets with atmospheres and surface environments different from Earth’s.
Sulfur dioxide emissions in Asia in the period 1985-1997
NASA Astrophysics Data System (ADS)
Streets, David G.; Tsai, Nancy Y.; Akimoto, Hajime; Oka, Kaoru
A consistent set of SO 2 emission trends has been developed for Asian countries for the time period 1985-1997. The trend is based on extrapolation of a detailed 1990 inventory, which was constructed as part of the World Bank's RAINS-ASIA project, using IEA energy-use data. The trend shows Asian SO 2 emissions growing from 33.7 Tg in 1990 to 39.2 Tg in 1997. Estimates interpolated from the RAINS-ASIA computer model suggest a value for 1997 of 46.4 Tg, assuming no major changes in emission abatement policies after 1990. The reduction in the 1997 value, by some 16%, is primarily due to regulatory requirements and other trends toward lower sulfur content of oil products and coal. A slowdown in the growth of emissions in China - due to a reduction in economic growth, the mining of higher-quality coals, enhanced environmental awareness, and a reduction in industrial coal use - has been instrumental in arresting the growth of Asian emissions. Most of the positive developments have occurred in East Asia, and high-emission growth rates persist in Southeast Asia and the Indian subcontinent. The outlook for the future is that Asian SO 2 emissions may well peak in the region of 40-45 Tg by the year 2020 or earlier, in contrast to previous predictions of 2020 emissions as high as 80-110 Tg. The trends developed in this paper are good news for the local and regional environment, particularly in East Asia. However, they also signify lower-than-anticipated concentrations of sulfate aerosol over the Asian continent, with the resulting possibility of greater-than-anticipated regional and global warming.
Code of Federal Regulations, 2012 CFR
2012-07-01
... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...
Code of Federal Regulations, 2013 CFR
2013-07-01
... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...
Code of Federal Regulations, 2011 CFR
2011-07-01
... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...
Code of Federal Regulations, 2010 CFR
2010-07-01
... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESKO KF; BERRIOCHOA MV
2010-02-26
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
Construction Management--Exploding Some Myths.
ERIC Educational Resources Information Center
Kluenker, Charles
1986-01-01
Construction management on educational facility projects provides boards of education with documentation showing the project is on track. Eight "myths" surrounding construction management are explained. (MLF)
Best practices for modifying transportation design, planning, and project evaluation in Texas.
DOT National Transportation Integrated Search
2017-03-01
This guidebook is a desktop guide for TxDOT staff to facilitate an understanding of CAV technologies and the current trends in development and deployment. The overview should aid in anticipating the evolution of the Texas fleet and its use under vari...
15 CFR 400.23 - Application for production authority.
Code of Federal Regulations, 2013 CFR
2013-01-01
... procedures); (4) Domestic inputs, foreign inputs, and plant value added as percentages of finished product value; (5) Projected shipments to domestic market and export market (percentages); (6) Estimated total... explanation of its anticipated economic effects; (b) Identity of the user and its corporate affiliation; (c) A...
15 CFR 400.23 - Application for production authority.
Code of Federal Regulations, 2014 CFR
2014-01-01
... procedures); (4) Domestic inputs, foreign inputs, and plant value added as percentages of finished product value; (5) Projected shipments to domestic market and export market (percentages); (6) Estimated total... explanation of its anticipated economic effects; (b) Identity of the user and its corporate affiliation; (c) A...
76 FR 81447 - Proposed Significant New Use Rules on Certain Chemical Substances
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-28
... subject chemical substances (NAICS codes 325 and 324110), e.g., chemical manufacturing and petroleum..., including: The projected volume of manufacturing and processing of a chemical substance. The extent to which... environment to a chemical substance. The reasonably anticipated manner and methods of manufacturing...
ERIC Educational Resources Information Center
Kennedy, Mike
2007-01-01
For some administrators and planners, designing and building education facilities may sometimes seem like a circus act--trying to project a persona of competence and confidence while juggling dozens of issues. Meanwhile, the audience--students, staff members and taxpayers--watch and wait with anticipation in hopes of getting what they paid for and…
FY 2014 Request for Proposals for the Source Reduction Assistance Grant Program
EPA is announcing the availability of SRA grants and/or cooperative agreements to fund projects supporting p2/source reduction and resource conservation; it is anticipated up to $147,000 will be available from each Region or up to $1,029,000 collectively.
CPBR's ERTT mission is to support basic biotechnology research and the development of new, commercially valuable technologies supportive of the long-term strategic goals of EPA. The research projects selected will address these goals. It is anticipated that the pro...
An index based method is developed that ranks the subwatersheds of a watershed based on their relative impacts on watershed response to anticipated land developments, and then applied to an urbanizing watershed in Eastern Pennsylvania. Simulations with a semi-distributed hydrolo...
Materials Center Collections and Procedures: Suggested Modifications.
ERIC Educational Resources Information Center
Davis, Larry L.
This description of a three year project of services to educators by the Kentucky Department of Education Materials Center includes the current collections, future collections, and the anticipated procedures necessary to provide optimum service and best utilize those materials. The plan involves better coordination between the three major…
Code of Federal Regulations, 2014 CFR
2014-10-01
... service units as developed from its traffic study. Operating ratios shall be determined for the issue... anticipated on the effective date of the proposed rates, with a separation indicating projected operating ratios on two bases, namely, “based on current revenues,” and “based on proposed revenues”. Operating...
Code of Federal Regulations, 2013 CFR
2013-10-01
... service units as developed from its traffic study. Operating ratios shall be determined for the issue... anticipated on the effective date of the proposed rates, with a separation indicating projected operating ratios on two bases, namely, “based on current revenues,” and “based on proposed revenues”. Operating...
Code of Federal Regulations, 2012 CFR
2012-10-01
... service units as developed from its traffic study. Operating ratios shall be determined for the issue... anticipated on the effective date of the proposed rates, with a separation indicating projected operating ratios on two bases, namely, “based on current revenues,” and “based on proposed revenues”. Operating...
Language Science and Orientalism in Imperial Germany
ERIC Educational Resources Information Center
Kaplan, Judith R. H.
2012-01-01
This dissertation addresses a significant gap in the historiography of science: the nature of the language sciences as "science." Focusing on disciplinary and intellectual developments in the context of Imperial Germany (1871-1918), the project anticipates, complicates, and helps to explain a widely recognized theoretical shift, namely,…
75 FR 17253 - Revisions to the General Conformity Regulations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-05
... anticipated as a result of port expansions in some of the nation's most polluted metropolitan areas. The...) of the CAA. Although most of the revisions affected the Transportation Conformity requirements... occur. The emissions from most Federal actions or projects occur within one nonattainment or maintenance...
24 CFR 891.400 - Responsibilities of owner.
Code of Federal Regulations, 2010 CFR
2010-04-01
... DISABILITIES PROGRAM) SUPPORTIVE HOUSING FOR THE ELDERLY AND PERSONS WITH DISABILITIES Project Management § 891.400 Responsibilities of owner. (a) Marketing. (1) The Owner must commence and continue diligent marketing activities not later than 90 days before the anticipated date of availability of the first unit or...
Inclusive Education at Primary Level: Reality or Phantasm
ERIC Educational Resources Information Center
Khan, Itfaq Khaliq; Behlol, Malik Ghulam
2014-01-01
The objectives of this study were to assess the impacts of Inclusive Education (IE) Project implemented in government schools of Islamabad and anticipate its practicability for public schools. Quantitative and qualitative methods were applied for data collection. Study instruments were structured interviews, unstructured focus group discussions,…
Building Organizational Capacity: Strategic Management in Higher Education
ERIC Educational Resources Information Center
Toma, J. Douglas
2010-01-01
Every university or college president envisions bold initiatives--big projects intended to change the nature of an institution with significant implications across all sectors. How can leaders and senior managers charged with implementing reforms effectively frame their work and anticipate potential pitfalls? No organization can maximize its…
ERIC Educational Resources Information Center
Cautin, Harvey; Regan, Edward
Requirements are discussed for an information retrieval language that enables users to employ natural language sentences in interaction with computer-stored files. Anticipated modes of operation of the system are outlined. These are: the search mode, the dictionary mode, the tables mode, and the statistical mode. Analysis of sample sentences…
The Lunar Mapping and Modeling Project
NASA Technical Reports Server (NTRS)
Noble, Sarah; French, Raymond; Nall, Mark; Muery, Kimberly
2009-01-01
LMMP was initiated in 2007 to help in making the anticipated results of the LRO spacecraft useful and accessible to Constellation. The LMMP is managing and developing a suite of lunar mapping and modeling tools and products that support the Constellation Program (CxP) and other lunar exploration activities. In addition to the LRO Principal Investigators, relevant activities and expertise that had already been funded by NASA was identified at ARC, CRREL (Army Cold Regions Research & Engineering Laboratory), GSFC, JPL, & USGS. LMMP is a cost capped, design-to-cost project (Project budget was established prior to obtaining Constellation needs)
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
NASA Astrophysics Data System (ADS)
Beliakov, Sergei
2018-03-01
Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.
Financial auditing at enterprises for control of projects realized with credit fund-raising
NASA Astrophysics Data System (ADS)
Lukmanova, Inessa
2017-10-01
The article analyzes methods of conducting financial audit under the construction control of projects implemented with raising credit funds in modern conditions. This work aims to improve the methodological toolkit of construction control when lending projects of the construction of transport infrastructure. The paper considers correlations of various procedures of construction control, financial audit and organizational and technical factors affecting investment and construction projects. The authors presented the logical scheme of the process of lending to legal entities and developed an algorithm of the procedure for conducting a financial audit, allowing to make possible adjustments and the right decision.
18 CFR 4.96 - Amendment of exemption.
Code of Federal Regulations, 2010 CFR
2010-04-01
... design, location, method of construction or operation of its project, it must first notify the..., location, method of construction or operation of the project, the exemption holder may implement the..., method of construction or the operation of the project works, the exemption holder may not implement the...
U.S. Geological Survey—Energy and Wildlife Research Annual Report for 2016
Khalil, Mona
2016-09-09
Recent growth and development of renewable energy and unconventional oil and gas extraction are rapidly diversifying the energy supply of the United States. Yet, as our Nation works to advance energy security and conserve wildlife, some conflicts have surfaced. To address these challenges, the U.S. Geological Survey (USGS) is conducting innovative research and developing workable solutions to reduce the impacts of energy production on wildlife. USGS scientists collaborate on many studies with scientists from other Federal, State, and local government agencies; Tribal nations; academic research institutions; and nongovernmental and private organizations.The mix of fuels used for electricity generation is evolving. Solar, natural gas, and wind energy made up most electricity generation additions in 2015 and 2016. The United States now leads the world in natural gas production, with new record highs for each year from 2011 through 2015. More than 48,000 wind turbines now contribute to power grids in most States, providing about 5 percent of U.S. end-use electricity demand in an average year. The number of utility-scale solar-energy projects is growing rapidly with solar energy projected to contribute to the largest electricity generation addition in 2016.A substantial number of large energy projects have been constructed on undeveloped public lands, and more are anticipated at an increasing rate, creating new stress to wildlife. Direct impacts include collisions with wind turbines and structures at solar facilities and loss of habitat which may negatively affect sensitive species. Recent estimates suggest 250,000 to 500,000 birds die each year at wind turbine facilities. Bat fatality rates at wind turbine facilities are less certain, but may average several hundred thousand per year throughout North America. Because new projects may be located in or near sensitive wildlife habitats, ecological science plays a key role in helping to guide project siting and operational decisions.
Implementation of Building Information Modeling (BIM) in Construction: A Comparative Case Study
NASA Astrophysics Data System (ADS)
Rowlinson, Steve; Collins, Ronan; Tuuli, Martin M.; Jia, Yunyan
2010-05-01
Building Information Modeling (BIM) approach is increasingly adopted in coordination of construction projects, with a number of parties providing BIM services and software solutions. However, the empirical impact of BIM on construction industry has yet to be investigated. This paper explores the interaction between BIM and the construction industry during its implementation, with a specific focus on the empirical impacts of BIM on the design and construction processes and professional roles during the process. Two cases were selected from recent construction projects coordinated with BIM systems: the Venetian Casino project in Macau and the Cathy Pacific Cargo Terminal project in Hong Kong. The former case illustrates how the conflicts emerged during the design process and procurement were addressed by adopting a BIM approach. The latter demonstrates how the adoption of BIM altered the roles of architect, contractor, and sub-contractors involved in the project. The impacts of BIM were critically reviewed and discussed.
Not ageing in place: Negotiating meanings of residency in age-related housing.
Vasara, Paula
2015-12-01
This article explores the experience of residing in age-related housing. The focus is on the negotiations around the multiple meanings assigned to place of residency among older people - in a situation where the official policy objectives of growing old in one's own home are not achieved. Narrative analysis is employed to study the experiences of older people aged 75 or older living in special types of housing due to actual or anticipated difficulties associated with age. The interviews are part of a larger body of data gathered in MOVAGE Moving in Old Age: Transitions in Housing and Care research project. The storyworld was structured by the romantic canonical narrative associated with the policy of 'ageing in place'; growing old at home is idealised and moving is constructed as a disruption. This breach was resolved through explaining deviance from canonical expectations by causes constructed as legitimate, through encountering trouble by constructing oneself as a non-typical resident, and through creating counter stories of natural transitions and choices. As a result, despite the commonly negative meanings associated with the residency in age-related housing, positive storylines respecting values embedded in the canonical narratives of home and endurance were achieved. A living environment that is experienced as suitable, and that has adequate formal help available, supports and enables wellbeing and independence. This is true within age-related housing as well as in other forms. Thus, even though the important meaning of a long-term home should continue to be acknowledged, various other kinds of forms of housing should be made available in order to enhance older people's sense of security and feeling that they are autonomous, independent agents in their everyday life in accordance with their subjective life experiences. Copyright © 2015 Elsevier Inc. All rights reserved.
NASA Astrophysics Data System (ADS)
Chowdhury, Tamara
2013-08-01
Senior design courses are a core part of curricula across engineering and technology disciplines. Such courses offer Construction Management (CMG) students the opportunity to bring together, assimilate and apply the knowledge they have acquired over their entire undergraduate academic programme to an applied technical project. Senior or Capstone design course engages students in a real-world project, enhance leadership development, and prepare to manage and lead project teams. The CMG programme's multidisciplinary approach at Alabama A&M University, combines essential components of construction techniques with concepts of business management to develop technically qualified individuals for responsible management roles in the design, construction and operation of major construction projects. This paper analyses the performance of the students and improvement due to the interaction with the faculty advisors and industrial panel during the two semester Capstone project. The results of this Capstone sequence have shown a continuous improvement of student performance.
Wang, Xiao
2013-01-01
Because interpersonal discussion about condom use can encourage subsequent condom use, this project aims to examine the psychological antecedents of intentions to discuss or request the use of condoms with a sexual partner. The data were collected from 849 heterosexual college students in the U.S.A. through an online survey. The survey contained several measures related to attitude functions (i.e., motivations), efficacy, norms and intentions to discuss condom use with a sexual partner. Participants' attitude functions weakly predicted intentions to discuss condom use. Communication efficacy was a more important predictor of intentions for females (vs. males) and for those in other relationships or not in a relationship (vs. long-term monogamous relationships). Anticipated negative emotions were a stronger predictor of intentions for those in long-term monogamous relationships (vs. other relationships or not in a relationship). Future research needs to consider more detailed attitude functions and anticipated emotions. Furthermore, background variables (e.g., gender and relationship status) can be moderators in addition to being distal predictors.
Second-Year Pharmacy Students’ Perceptions of Adhering to a Complex Simulated Medication Regimen
Hamer, David; Lehotsky, Kristin
2012-01-01
Objective. To conduct a simulated medication regimen with second-year pharmacy students to determine their anticipated versus actual difficulty in adhering to it. Methods. Second-year pharmacy students were given 6 fictitious medications (jellybeans) and a drug regimen to adhere to for 6 days. Pre- and post-intervention surveys were conducted to compare participants anticipated vs. actual difficulty with adherence and changes in empathy toward patients. Results. The 69 (96%) students who participated in the study missed on average 16% of all simulated medication doses and noted that adhering to the complex medication regimen was more difficult than they had anticipated. Eighty-nine percent of students agreed or strongly agreed the project was valuable in developing empathy towards patients taking complex medication regimens. Conclusions. Pharmacy students participating in a simulated medication regimen missed a notable number of doses and reported a greater level of empathy for patients taking complex medication regiments. Finding meaningful ways to integrate adherence into the curriculum is essential. PMID:22412210
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Hanson, Mark D; Johnson, Samantha; Niec, Anne; Pietrantonio, Anna Marie; High, Bradley; MacMillan, Harriet; Eva, Kevin W
2008-01-01
Adolescent mental illness stigma-related factors may contribute to adolescent standardized patients' (ASP) discomfort with simulations of psychiatric conditions/adverse psychosocial experiences. Paradoxically, however, ASP involvement may provide a stigma-reduction strategy. This article reports an investigation of this hypothetical association between simulation discomfort and mental illness stigma. ASPs were randomly assigned to one of two simulation conditions: one was associated with mental illness stigma and one was not. ASP training methods included carefully written case simulations, educational materials, and active teaching methods. After training, ASPs completed the adapted Project Role Questionnaire to rate anticipated role discomfort with hypothetical adolescent psychiatric conditions/adverse psychosocial experiences and to respond to open-ended questions regarding this discomfort. A mixed design ANOVA was used to compare comfort levels across simulation conditions. Narrative responses to an open-ended question were reviewed for relevant themes. Twenty-four ASPs participated. A significant effect of simulation was observed, indicating that ASPs participating in the simulation associated with mental illness stigma anticipated greater comfort with portraying subsequent stigma-associated roles than did ASPs in the simulation not associated with stigma. ASPs' narrative responses regarding their reasons for anticipating discomfort focused upon the role of knowledge-related factors. ASPs' work with a psychiatric case simulation was associated with greater anticipated comfort with hypothetical simulations of psychiatric/adverse psychosocial conditions in comparison to ASPs lacking a similar work experience. The ASPs provided explanations for this anticipated discomfort that were suggestive of stigma-related knowledge factors. This preliminary research suggests an association between ASP anticipated role discomfort and mental illness stigma, and that ASP work may contribute to stigma reduction.
Hu, Wenfa; He, Xinhua
2014-01-01
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.
ERIC Educational Resources Information Center
Packard, Becky Wai-Ling; Babineau, Maureen E.; Machado, Haidee
2012-01-01
This article examined the future plans constructed by Latina adolescent girls and their mothers within a lower income urban community. Seventeen high school juniors and their mothers were interviewed about the girls' pursuit of a trade during high school and anticipated postsecondary pathways in the nursing field. Thematic content analyses…
ERIC Educational Resources Information Center
Soromessa, Teshome
2015-01-01
This study attempted to assess the practice of student assessment in the College of Natural Science of Addis Ababa University, specifically aimed at investigating whether or not science instructors are well aware of test blue-print, general principles of evaluation and rule of test construction as anticipated in the new education and training…
Code of Federal Regulations, 2011 CFR
2011-10-01
...-Governance Tribes carry out construction projects without assuming these Federal environmental... 42 Public Health 1 2011-10-01 2011-10-01 false May Self-Governance Tribes carry out construction projects without assuming these Federal environmental responsibilities? 137.291 Section 137.291 Public...
18 CFR 4.104 - Amendment of exemption.
Code of Federal Regulations, 2010 CFR
2010-04-01
... change the design, location, method of construction or operation of its project, it must first notify the..., location, method of construction or operation of the project, the exemption holder may implement the..., method of construction or the operation of the project works, the exemption holder may not implement the...
NMRPipe: a multidimensional spectral processing system based on UNIX pipes.
Delaglio, F; Grzesiek, S; Vuister, G W; Zhu, G; Pfeifer, J; Bax, A
1995-11-01
The NMRPipe system is a UNIX software environment of processing, graphics, and analysis tools designed to meet current routine and research-oriented multidimensional processing requirements, and to anticipate and accommodate future demands and developments. The system is based on UNIX pipes, which allow programs running simultaneously to exchange streams of data under user control. In an NMRPipe processing scheme, a stream of spectral data flows through a pipeline of processing programs, each of which performs one component of the overall scheme, such as Fourier transformation or linear prediction. Complete multidimensional processing schemes are constructed as simple UNIX shell scripts. The processing modules themselves maintain and exploit accurate records of data sizes, detection modes, and calibration information in all dimensions, so that schemes can be constructed without the need to explicitly define or anticipate data sizes or storage details of real and imaginary channels during processing. The asynchronous pipeline scheme provides other substantial advantages, including high flexibility, favorable processing speeds, choice of both all-in-memory and disk-bound processing, easy adaptation to different data formats, simpler software development and maintenance, and the ability to distribute processing tasks on multi-CPU computers and computer networks.
Integration and verification testing of the Large Synoptic Survey Telescope camera
NASA Astrophysics Data System (ADS)
Lange, Travis; Bond, Tim; Chiang, James; Gilmore, Kirk; Digel, Seth; Dubois, Richard; Glanzman, Tom; Johnson, Tony; Lopez, Margaux; Newbry, Scott P.; Nordby, Martin E.; Rasmussen, Andrew P.; Reil, Kevin A.; Roodman, Aaron J.
2016-08-01
We present an overview of the Integration and Verification Testing activities of the Large Synoptic Survey Telescope (LSST) Camera at the SLAC National Accelerator Lab (SLAC). The LSST Camera, the sole instrument for LSST and under construction now, is comprised of a 3.2 Giga-pixel imager and a three element corrector with a 3.5 degree diameter field of view. LSST Camera Integration and Test will be taking place over the next four years, with final delivery to the LSST observatory anticipated in early 2020. We outline the planning for Integration and Test, describe some of the key verification hardware systems being developed, and identify some of the more complicated assembly/integration activities. Specific details of integration and verification hardware systems will be discussed, highlighting some of the technical challenges anticipated.
Ranking the Project Management Success Factors for Construction Project in South India
NASA Astrophysics Data System (ADS)
Aneesha, K.; Haridharan, M. K.
2017-07-01
In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.
NASA Technical Reports Server (NTRS)
Farley, David R.
1987-01-01
The Cal Poly Space Project is an effort on the part of several highly motivated students to deploy a space canister which will examine the effects of microgravity on electroplating and immiscible metals. The experiments will be controlled and monitored by a specialized triple redundancy system developed to defer the possible electronic errors due to uncontrollable factors such as photons from the Sun. With the finalization of the payload design and the near completion of the data control system, the integration phase of the project is anticipated to be completed and the project ready for launching by early 1987. It is hoped that the experiments will lead to new insights in space research and also prove profitable to industry.
NASA Technical Reports Server (NTRS)
1978-01-01
A digest of information on remote sensor data systems is given. It includes characteristics of spaceborne sensors and the supportive systems immediately associated therewith. It also includes end-to-end systems information that will assist the user in appraising total data system impact produced by a sensor. The objective is to provide a tool for anticipating the complexity of systems and potential data system problems as new user needs are generated. Materials in this handbook span sensor systems from the present to those planned for use in the 1990's. Sensor systems on all planned missions are presented in digest form, condensed from data as available at the time of compilation. Projections are made of anticipated systems.
Embodied Perspective Taking in Learning about Complex Systems
ERIC Educational Resources Information Center
Soylu, Firat; Holbert, Nathan; Brady, Corey; Wilensky, Uri
2017-01-01
In this paper we present a learning design approach that leverages perspective-taking to help students learn about complex systems. We define perspective-taking as projecting one's identity onto external entities (both animate and inanimate) in an effort to predict and anticipate events based on ecological cues, to automatically sense the…
CHILDREN'S ENVIRONMENTAL HEALTH AND DISEASE PREVENTION RESEARCH CENTERS: FORMATIVE CENTERS
We expect, at the end of this project, to be able to 1) characterize sources of maternal exposure to BPA, the relationship between maternal and intrauterine levels of BPA and 2) gain an in‐depth understanding of BPA affects early development. We anticipate this will improve ou...
49 CFR 262.11 - Application process.
Code of Federal Regulations, 2010 CFR
2010-10-01
... application, a State must submit a description of the anticipated public and private benefits associated with... assessment of how those benefits outweigh the costs of the proposed project. The determination of such benefits shall be developed in consultation with the owner and user of the rail line being relocated or...
This Multi-Site QAPP presents the organization, data quality objectives (DQOs), a set of anticipated activities, sample analysis, data handling and specific Quality Assurance/Quality Control (QA/QC) procedures associated with Studies done in EPA Region 5
FACTORS RELATING TO THE RELEASE OF STACHYBOTRYS CHARTARUM SPORES FROM CONTAMINATED SOURCES
The paper describes preliminary results of a research project to determine the factors that control the release of S. chartarum spores from a contaminated source and test ways to reduce spore release and thus exposure. As anticipated, S. chartarum spore emissions from gypsum boar...
49 CFR 262.9 - Criteria for selection of projects.
Code of Federal Regulations, 2010 CFR
2010-10-01
... pedestrian traffic, safety, community quality of life, and area commerce; (e) The effects of the rail line...-effective in terms of the benefits achieved in relation to the funds expended. To that end, the FRA will consider the anticipated public and private benefits associated with each rail line relocation or...
ERIC Educational Resources Information Center
Cameron, Louise
2009-01-01
Missouri artist George Caleb Bingham (1811-1879) was both a painter and a politician. An exhibition of his work at the Saint Louis Art Museum in the fall of 2007 sponsored by Bank of America featured his painting "The County Election" along with its preparatory drawings. In anticipation of the exhibition, the museum's education…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-10
... thousands of years (Nettleton and Peterson 1983, p. 193; Seronko 2006, in litt.). Climate conditions that.... The current livestock management conditions and associated conservation measures address this threat... projected future temperature conditions, the cover of sagebrush in the Great Basin region is anticipated to...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Coe, B.A.
1980-01-01
A district heating system for the Pagosa Springs central business district is in the planning stage. A detailed analysis of the project is presented. It comprises area and site specific studies and describes in detail the recent, current, anticipated, and postulated geothermal development activities. (MHR)
Pres. Clinton's Education Priorities: Early 1993 Indications.
ERIC Educational Resources Information Center
Parker, Franklin
Educators anticipate bold new education reform initiatives from President Bill Clinton and his Education Secretary, Richard Riley. A priority project is college tuition loans, repayable through voluntary public service jobs. The President also supports increased funding for the Head Start Program and money for a national apprenticeship program for…
ERIC Educational Resources Information Center
Kreider, Gail Yohe
2008-01-01
In this problem-based learning activity (PBL), students embark on a science trek to answer the question "Where is the science in my neighborhood?" The project serves as an excellent review of science curriculum in anticipation of Virginia's year-end standardized test--the Standards of Learning (SOL). This has proved to be an interesting…
Predicting Fire Season Severity in the Pacific Northwest
Paul Werth
2006-01-01
Projections of fire season severity that integrate historical weather and fire information can be used by fire managers when making decisions about allocating and prioritizing firefighting resources. They enable fire managers to anticipate fire activity and pre-position resources to maximize public and firefighter safety, reduce environmental impacts, and lower...
Structural mechanics research at the Langley Research Center
NASA Technical Reports Server (NTRS)
Stephens, W. B.
1976-01-01
The contributions of NASA's Langley Research Center in areas of structural mechanics were traced from its NACA origins in 1917 to the present. The developments in structural mechanics technology since 1940 were emphasized. A brief review of some current research topics were discussed as well as anticipated near-term research projects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... is a farmer in the United States or its territories that produced apples, on not less than 10 acres... cooperative. Cash flow budget is a projection listing all anticipated cash inflows (including all farm income... and other expenses) to be incurred by the borrower during the period of the budget. A cash flow budget...
Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2007
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bisping, Lynn E.
2007-01-31
This document contains the calendar year 2007 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2007 in which case the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2007.
Workshop on Solid State Switches for Pulsed Power, held January 12-14, 1983 at Tamarron, Colorado
1983-05-31
of its anticipated scalabil- ity. However, the projected performance of other types of dis- crete switches made their continued exploration and...linking of "asynchronous AC power grids. Some present installations arid projected increases are showr. in Table 2. A new commercial power application...Average Power 62.5 KW 160 KW Device RBDT (RSR) T60R SCR 2N3873 Arra , 6 Series 10 Parallel-20 Series Table 18. Applications of solid state pulse
DOE Office of Scientific and Technical Information (OSTI.GOV)
Akimoto, Hajime; Kukita; Ohnuki, Akira
1997-07-01
The Japan Atomic Energy Research Institute (JAERI) is conducting several research programs related to thermal-hydraulic and neutronic behavior of light water reactors (LWRs). These include LWR safety research projects, which are conducted in accordance with the Nuclear Safety Commission`s research plan, and reactor engineering projects for the development of innovative reactor designs or core/fuel designs. Thermal-hydraulic and neutronic codes are used for various purposes including experimental analysis, nuclear power plant (NPP) safety analysis, and design assessment.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESO KF; HAMILTON HM; FARNER M
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
NASA Astrophysics Data System (ADS)
Little-Devito, M.; Chasmer, L.; Devito, K.; Kettridge, N.; Lukenbach, M. C.; Mendoza, C. A.
2017-12-01
Wetlands are important features in large-scale reclamation projects, and are integral to sustaining landscape eco-hydrological function and meeting reclamation goals. Despite a sub-humid climate, opportunistic wetlands are appearing on reconstructed landforms, and present an opportunity to understand the requirements for wetland construction, relative wetland succession, and their role in functioning landscapes. The relative importance and relationship between local and landscape-scale factors in determining initial wetland formation, as well as the relative occurrence and wetland type found on newly reclaimed landscapes was studied using both field and active (LiDAR) remote sensing methods. A random transect survey approach was used to characterize vegetation communities, soil and hydrologic characteristics, and local and landscape physiographic position across reconstructed landforms. Transects were also used to validate a broader area LiDAR-based classification. Preliminary findings suggest a higher frequency of opportunistic wetlands than anticipated. Soil texture of constructed landforms was important in determining the significance of local and landscape factors. On fine-textured constructed landforms, regardless of landscape position, wetlands formed on flat areas and in shallow depressions where soils had low water storage that promoted frequent surface saturation. Wetlands were less frequent on coarse-textured landforms and their location was controlled by landscape-scale factors, being restricted to the toes of slopes and areas intersecting the groundwater table. Wetlands found across all material types were predominantly Salix sp. and Carex sp. swamps with Typha sp. marsh complexes. This may indicate a potential initial phase of wetland succession and paludification in the Boreal Plains. These findings have important implications for understanding general wetland development, the initial phase of wetland paludification, and will aid the development of a geomorphic framework to better inform wetland construction and promote sustainable forest-wetland complexes similar to those found in natural landscapes.
NASA Astrophysics Data System (ADS)
Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping
2018-03-01
System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.
Barch, Deanna M; Pagliaccio, David; Luking, Katherine
2016-01-01
Motivational and hedonic impairments are core aspects of a variety of types of psychopathology. These impairments cut across diagnostic categories and may be critical to understanding major aspects of the functional impairments accompanying psychopathology. Given the centrality of motivational and hedonic systems to psychopathology, the Research Domain Criteria (RDoC) initiative includes a "positive valence" systems domain that outlines a number of constructs that may be key to understanding the nature and mechanisms of motivational and hedonic impairments in psychopathology. These component constructs include initial responsiveness to reward, reward anticipation or expectancy, incentive or reinforcement learning, effort valuation, and action selection. Here, we review behavioral and neuroimaging studies providing evidence for impairments in these constructs in individuals with psychosis versus in individuals with depressive pathology. There are important differences in the nature of reward-related and hedonic deficits associated with psychosis versus depression that have major implications for our understanding of etiology and treatment development. In particular, the literature strongly suggests the presence of impairments in in-the-moment hedonics or "liking" in individuals with depressive pathology, particularly among those who experience anhedonia. Such deficits may propagate forward and contribute to impairments in other constructs that are dependent on hedonic responses, such as anticipation, learning, effort, and action selection. Such hedonic impairments could reflect alterations in dopamine and/or opioid signaling in the striatum related to depression or specifically to anhedonia in depressed populations. In contrast, the literature points to relatively intact in-the-moment hedonic processing in psychosis, but provides much evidence for impairments in other components involved in translating reward to action selection. Particularly, individuals with schizophrenia exhibit altered reward prediction and associated striatal and prefrontal activation, impaired reward learning, and impaired reward-modulated action selection.
Managing the construction bidding process : a move to simpler construction plan sets
DOT National Transportation Integrated Search
2001-01-31
This project was conducted to determine whether construction plan sets could be significantly simplified to speed the process of moving projects to construction. The work steps included a literature review, a telephone survey of highway agencies in s...
On the prevailing construction waste recycling practices: a South East Queensland study.
Tam, Vivian W Y; Kotrayothar, Duangthidar; Loo, Yew-Chaye
2009-03-01
Waste generated from construction and building demolition work constitutes about 68% of all solid waste generated each year in South East Queensland. Consequently, it has created a serious waste management problem. The State Governments of Victoria and New South Wales have been encouraging the use of recycled materials from construction and related waste; they have also promulgated specifications for their use. In Queensland, however, similar regulations are not anticipated in the near future, which explains the lack of funded research conducted in this important arena. This paper presents an evaluation of the prevailing waste recycling practices in Queensland. Nine sites were visited, including two construction sites, three demolition sites, three recycling plants and one landfill in South East Queensland. The difficulties encountered by the recycling programme operators and their associates at these sites are described and the benefits of recycling construction materials are presented. One of the major barriers is that the local councils disallow the use of recycled materials in new construction work. To help rectify these impediments to recycling, recommendations are given to increase the use of recycled construction waste in South East Queensland.
26 CFR 1.1039-1 - Certain sales of low-income housing projects.
Code of Federal Regulations, 2011 CFR
2011-04-01
... considered as the purchase or construction by A of such a project. (2) Special rules. (i) The cost of a... capital expenditures by the taxpayer that are attributable to acquisition, construction, or reconstruction..., 1970. If the taxpayer had begun construction of another qualified housing project on January 1, 1969...
26 CFR 1.1039-1 - Certain sales of low-income housing projects.
Code of Federal Regulations, 2012 CFR
2012-04-01
... considered as the purchase or construction by A of such a project. (2) Special rules. (i) The cost of a... capital expenditures by the taxpayer that are attributable to acquisition, construction, or reconstruction..., 1970. If the taxpayer had begun construction of another qualified housing project on January 1, 1969...
77 FR 25080 - Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
...-AA00 Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR AGENCY: Coast Guard, DHS... trestles and construction cranes involved in the construction of the TriMet Bridge on the Willamette River... project. These safety zones replace the prior safety zones established for the TriMet Bridge construction...
Prakash, Pavitra; Nambiar, Aishwarya; Sheeba, Vasu
2017-01-01
In Drosophila, neuropeptide Pigment Dispersing Factor (PDF) is expressed in small and large ventral Lateral Neurons (sLNv and lLNv), among which sLNv are critical for activity rhythms in constant darkness. Studies show that this is mediated by rhythmic accumulation and likely secretion of PDF from sLNv dorsal projections, which in turn synchronises molecular oscillations in downstream circadian neurons. Using targeted expression of a neurodegenerative protein Huntingtin in LNv, we evoke a selective loss of neuropeptide PDF and clock protein PERIOD from sLNv soma. However, PDF is not lost from sLNv dorsal projections and lLNv. These flies are behaviourally arrhythmic in constant darkness despite persistence of PDF oscillations in sLNv dorsal projections and synchronous PERIOD oscillations in downstream circadian neurons. We find that PDF oscillations in sLNv dorsal projections are not sufficient for sustenance of activity rhythms in constant darkness and this is suggestive of an additional component that is possibly dependent on sLNv molecular clock and PDF in sLNv soma. Additionally, despite loss of PERIOD in sLNv, their activity rhythms entrain to light/dark cycles indicating that sLNv molecular clocks are not necessary for entrainment. Under constant light, these flies lack PDF from both soma and dorsal projections of sLNv, and when subjected to light/dark cycles, show morning and evening anticipation and accurately phased morning and evening peaks. Thus, under light/dark cycles, PDF in sLNv is not necessary for morning anticipation.
Prakash, Pavitra; Nambiar, Aishwarya; Sheeba, Vasu
2017-01-01
In Drosophila, neuropeptide Pigment Dispersing Factor (PDF) is expressed in small and large ventral Lateral Neurons (sLNv and lLNv), among which sLNv are critical for activity rhythms in constant darkness. Studies show that this is mediated by rhythmic accumulation and likely secretion of PDF from sLNv dorsal projections, which in turn synchronises molecular oscillations in downstream circadian neurons. Using targeted expression of a neurodegenerative protein Huntingtin in LNv, we evoke a selective loss of neuropeptide PDF and clock protein PERIOD from sLNv soma. However, PDF is not lost from sLNv dorsal projections and lLNv. These flies are behaviourally arrhythmic in constant darkness despite persistence of PDF oscillations in sLNv dorsal projections and synchronous PERIOD oscillations in downstream circadian neurons. We find that PDF oscillations in sLNv dorsal projections are not sufficient for sustenance of activity rhythms in constant darkness and this is suggestive of an additional component that is possibly dependent on sLNv molecular clock and PDF in sLNv soma. Additionally, despite loss of PERIOD in sLNv, their activity rhythms entrain to light/dark cycles indicating that sLNv molecular clocks are not necessary for entrainment. Under constant light, these flies lack PDF from both soma and dorsal projections of sLNv, and when subjected to light/dark cycles, show morning and evening anticipation and accurately phased morning and evening peaks. Thus, under light/dark cycles, PDF in sLNv is not necessary for morning anticipation. PMID:28558035
Use of safety management practices for improving project performance.
Cheng, Eddie W L; Kelly, Stephen; Ryan, Neal
2015-01-01
Although site safety has long been a key research topic in the construction field, there is a lack of literature studying safety management practices (SMPs). The current research, therefore, aims to test the effect of SMPs on project performance. An empirical study was conducted in Hong Kong and the data collected were analysed with multiple regression analysis. Results suggest that 3 of the 15 SMPs, which were 'safety committee at project/site level', 'written safety policy', and 'safety training scheme' explained the variance in project performance significantly. Discussion about the impact of these three SMPs on construction was provided. Assuring safe construction should be an integral part of a construction project plan.
Concentrating Solar Power Projects - Hami 50 MW CSP Project | Concentrating
Solar Power | NREL Hami 50 MW CSP Project Status Date: April 6, 2018 Project Overview Project MW Status: Under construction Do you have more information, corrections, or comments? Background Technology: Power tower Status: Under construction Country: China City: Hami Region: Xinjiang Autonomous
Instantaneous Project Controls: Current Status, State of the Art, Benefits, and Strategies
ERIC Educational Resources Information Center
Abbaszadegan, Amin
2016-01-01
Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In…
Constructability issues on KyTC projects.
DOT National Transportation Integrated Search
2003-07-01
A successful constructibility review process for a transportation agency must follow an established methodology similar to value engineering. The process must be flexible and address the critical issues impacting transportation construction projects,...
A common feature pharmacophore for FDA-approved drugs inhibiting the Ebola virus.
Ekins, Sean; Freundlich, Joel S; Coffee, Megan
2014-01-01
We are currently faced with a global infectious disease crisis which has been anticipated for decades. While many promising biotherapeutics are being tested, the search for a small molecule has yet to deliver an approved drug or therapeutic for the Ebola or similar filoviruses that cause haemorrhagic fever. Two recent high throughput screens published in 2013 did however identify several hits that progressed to animal studies that are FDA approved drugs used for other indications. The current computational analysis uses these molecules from two different structural classes to construct a common features pharmacophore. This ligand-based pharmacophore implicates a possible common target or mechanism that could be further explored. A recent structure based design project yielded nine co-crystal structures of pyrrolidinone inhibitors bound to the viral protein 35 (VP35). When receptor-ligand pharmacophores based on the analogs of these molecules and the protein structures were constructed, the molecular features partially overlapped with the common features of solely ligand-based pharmacophore models based on FDA approved drugs. These previously identified FDA approved drugs with activity against Ebola were therefore docked into this protein. The antimalarials chloroquine and amodiaquine docked favorably in VP35. We propose that these drugs identified to date as inhibitors of the Ebola virus may be targeting VP35. These computational models may provide preliminary insights into the molecular features that are responsible for their activity against Ebola virus in vitro and in vivo and we propose that this hypothesis could be readily tested.
A common feature pharmacophore for FDA-approved drugs inhibiting the Ebola virus
Ekins, Sean; Freundlich, Joel S.; Coffee, Megan
2014-01-01
We are currently faced with a global infectious disease crisis which has been anticipated for decades. While many promising biotherapeutics are being tested, the search for a small molecule has yet to deliver an approved drug or therapeutic for the Ebola or similar filoviruses that cause haemorrhagic fever. Two recent high throughput screens published in 2013 did however identify several hits that progressed to animal studies that are FDA approved drugs used for other indications. The current computational analysis uses these molecules from two different structural classes to construct a common features pharmacophore. This ligand-based pharmacophore implicates a possible common target or mechanism that could be further explored. A recent structure based design project yielded nine co-crystal structures of pyrrolidinone inhibitors bound to the viral protein 35 (VP35). When receptor-ligand pharmacophores based on the analogs of these molecules and the protein structures were constructed, the molecular features partially overlapped with the common features of solely ligand-based pharmacophore models based on FDA approved drugs. These previously identified FDA approved drugs with activity against Ebola were therefore docked into this protein. The antimalarials chloroquine and amodiaquine docked favorably in VP35. We propose that these drugs identified to date as inhibitors of the Ebola virus may be targeting VP35. These computational models may provide preliminary insights into the molecular features that are responsible for their activity against Ebola virus in vitro and in vivo and we propose that this hypothesis could be readily tested. PMID:25653841
Keys, Yolanda; Silverman, Susan R; Evans, Jennie
2017-10-01
The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.
SCHOOL CONSTRUCTION SYSTEMS DEVELOPMENT PROJECT.
ERIC Educational Resources Information Center
BOICE, JOHN,; AND OTHERS
ONE-HUNDRED MANUFACTURERS EXPRESSED INTEREST IN BIDDING FOR A SYSTEM ON SCHOOL CONSTRUCTION CALLED SCSD OR SCHOOL CONSTRUCTION SYSTEMS DEVELOPMENT TO THE FIRST CALIFORNIA COMMISSION ON SCHOOL CONSTRUCTION SYSTEMS. TWENTY-TWO BUILDINGS COMPRISED THE PROJECT. THE OBJECTIVE WAS TO DEVELOP AN INTEGRATED SYSTEM OF STANDARD SCHOOL BUILDING COMPONENTS…