DOE Office of Scientific and Technical Information (OSTI.GOV)
Biebesheimer, E.
This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Corrective Actions/Compliance Schedule Approval Report for the subject facility, contains the corrective actions required to bring the facility into compliance as a result of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. These actions are delineated in the Compliance Schedule Approvals which also contain; noncompliances, risks, compensatory measures, schedules for corrective actions, justifications for approval, and resource impacts.
75 FR 29803 - Agency Information Collection Activity Seeking OMB Approval
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-27
... action to correct unsafe conditions in aircraft, engines, propellers, and appliances. Reports of... issued to require correct corrective action to correct unsafe conditions in aircraft, engines, propellers...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robert Boehlecke
2004-04-01
The six bunkers included in CAU 204 were primarily used to monitor atmospheric testing or store munitions. The ''Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada'' (NNSA/NV, 2002a) provides information relating to the history, planning, and scope of the investigation; therefore, it will not be repeated in this CADD. This CADD identifies potential corrective action alternatives and provides a rationale for the selection of a recommended corrective action alternative for each CAS within CAU 204. The evaluation of corrective action alternatives is based on process knowledge and the results of investigative activitiesmore » conducted in accordance with the CAIP (NNSA/NV, 2002a) that was approved prior to the start of the Corrective Action Investigation (CAI). Record of Technical Change (ROTC) No. 1 to the CAIP (approval pending) documents changes to the preliminary action levels (PALs) agreed to by the Nevada Division of Environmental Protection (NDEP) and DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This ROTC specifically discusses the radiological PALs and their application to the findings of the CAU 204 corrective action investigation. The scope of this CADD consists of the following: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of corrective action alternatives in relation to corrective action objectives and screening criteria; and (5) Recommend and justify a preferred corrective action alternative for each CAS within CAU 204.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krauss, Mark J
This document constitutes an addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 529: Area 25 Contaminated Materials, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction (UR) Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with the URmore » Removal document, this addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-23-17, Contaminated Wash (Parcel H). This UR was established as part of FFACO corrective actions and was based on the presence of total petroleum hydrocarbon diesel-range organics contamination at concentrations greater than the NDEP action level at the time of the initial investigation.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-27
..., no. 225, page 72237. Airworthiness Directives are regulations issued to require correct corrective... inspections are often needed when emergency corrective action is taken to determine if the action was adequate...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-19
..., page 73114. Airworthiness Directives are regulations issued to require action to correct unsafe... emergency corrective action is taken to determine if the action was adequate to correct the unsafe condition... DePaepe at (405) 954-9362, or by email at: [email protected] . SUPPLEMENTARY INFORMATION: [[Page...
42 CFR 431.992 - Corrective action plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...
42 CFR 431.992 - Corrective action plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...
42 CFR 431.992 - Corrective action plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...
DOE Office of Scientific and Technical Information (OSTI.GOV)
BECHTEL NEVADA; U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION NEVADA SITE OFFICE
2005-08-01
Corrective Action Unit (CAU) 516, Septic Systems and Discharge Points, is listed in the ''Federal Facility Agreement and Consent Order'' (FFACO) of 1996 (FFACO, 1996). CAU 516 consists of six Corrective Action Sites (CASs) located in Areas 3, 6, and 22 of the Nevada Test Site (NTS), which is located approximately 65 miles northwest of Las Vegas, Nevada (Figure 1). CAU 516 is comprised of the following six CASs: (1) 03-59-01 Building 3C-36 Septic System; (2) 03-59-02 Building 3C-45 Septic System; (3) 06-51-01 Sump and Piping; (4) 06-51-02 Clay Pipe and Debris; (5) 06-51-03 Clean-Out Box and Piping; and (6)more » 22-19-04 Vehicle Decontamination Area. Details on site history and site characterization results for CAU 516 are provided in the approved Corrective Action Investigation Plan (CAIP), (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2003), and the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2004).« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-14
... Deterioration'' to approve changes to Georgia's SIP-approved regulations entitled ``Air Quality Control Rule 391... a separate action, the correct version of EPA's proposed rulemaking related to Georgia's Air Quality Control Rule 391-3-.1 is being provided for public comment. This course of action will promote efficiency...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-22
... correct corrective action to correct unsafe conditions in aircraft, engines, propellers, and appliances... action was adequate to correct the unsafe condition. The respondents are aircraft owners and operators... when an unsafe condition is discovered on a specific aircraft type. If the condition is serious enough...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-07
... correct corrective action to correct unsafe conditions in aircraft, engines, propellers, and appliances... action was adequate to correct the unsafe condition. The respondents are aircraft owners and operators... when an unsafe condition is discovered on a specific aircraft type. If the condition is serious enough...
Closure Report for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 536 is located in Area 3 of the Nevada Test Site. CAU 536 is listed in the Federal Facility Agreement and Consent Order of 1996 as Area 3 Release Site, and comprises a single Corrective Action Site (CAS): {sm_bullet} CAS 03-44-02, Steam Jenny Discharge The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CAS 03-44-02 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)- and polyaromatic hydrocarbon (PAH)-impacted soil, soil impacted with plutonium (Pu)-239, and concrete pad debris. CAU 536 was closed in accordance with the NDEP-approved CAU 536more » Corrective Action Plan (CAP), with minor deviations as approved by NDEP. The closure activities specified in the CAP were based on the recommendations presented in the CAU 536 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 536 closure activities. During closure activities, approximately 1,000 cubic yards (yd3) of hydrocarbon waste in the form of TPH- and PAH-impacted soil and debris, approximately 8 yd3 of Pu-239-impacted soil, and approximately 100 yd3 of concrete debris were generated, managed, and disposed of appropriately. Additionally, a previously uncharacterized, buried drum was excavated, removed, and disposed of as hydrocarbon waste as a best management practice. Waste minimization techniques, such as the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure« less
Closure Report for Corrective Action Unit 516: Septic Systems and Discharge Points
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 516 is located in Areas 3, 6, and 22 of the Nevada Test Site. CAU 516 is listed in the Federal Facility Agreement and Consent Order of 1996 as Septic Systems and Discharge Points, and is comprised of six Corrective Action Sites (CASs): {sm_bullet} CAS 03-59-01, Bldg 3C-36 Septic System {sm_bullet} CAS 03-59-02, Bldg 3C-45 Septic System {sm_bullet} CAS 06-51-01, Sump and Piping {sm_bullet} CAS 06-51-02, Clay Pipe and Debris {sm_bullet} CAS 06-51-03, Clean Out Box and Piping {sm_bullet} CAS 22-19-04, Vehicle Decontamination Area The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASsmore » 06-51-02 and 22-19-04 is no further action. The NDEP-approved corrective action alternative for CASs 03-59-01, 03-59-02, 06-51-01, and 06-51-03 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)-impacted septic tank contents, septic tanks, distribution/clean out boxes, and piping. CAU 516 was closed in accordance with the NDEP-approved CAU 516 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 516 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 516 closure activities. During closure activities, approximately 186 tons of hydrocarbon waste in the form of TPH-impacted soil and debris, as well as 89 tons of construction debris, were generated and managed and disposed of appropriately. Waste minimization techniques, such as field screening of soil samples and the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure work.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-06
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R03-OAR-2012-0381; FRL-9747-9] Approval and Promulgation of Air Quality Implementation Plans; Delaware; Requirements for Prevention of Significant...: Environmental Protection Agency (EPA). ACTION: Final rule; correcting amendment. SUMMARY: This document corrects...
DOE Office of Scientific and Technical Information (OSTI.GOV)
BECHTEL NEVADA
2006-09-01
This Closure Report (CR) describes the closure activities performed at CAU 528, Polychlorinated Biphenyls Contamination, as presented in the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) (US. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSAINSO], 2005). The approved closure alternative was closure in place with administrative controls. This CR provides a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
2008-10-01
This document constitutes an addendum to the July 2003, Closure Report for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications.
EPA published final rules in the Federal Register approving certain revisions to the California SIP. EPA included inaccurate amendatory instructions preventing incorporation of the actions into the CFR. All the errors are being corrected by this action.
75 FR 27401 - List of Approved Spent Fuel Storage Casks: NUHOMS® HD System Revision 1; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-17
... Storage Casks: NUHOMS[reg] HD System Revision 1; Correction AGENCY: Nuclear Regulatory Commission. ACTION... HD spent fuel storage cask system. This action is necessary to correctly specify the effective date... on May 6, 2010 (75 FR 24786), that amends the regulations that govern storage of spent nuclear fuel...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krauss, Mark J
This document constitutes an addendum to the Closure Report for Corrective Action Unit 357: Mud Pits and Waste Dump, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with the UR Removal document, thismore » addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 04-26-03, Lead Bricks. This UR was established as part of FFACO corrective actions and was based on the presence of lead contamination at concentrations greater than the action level established at the time of the initial investigation.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-27
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration 21 CFR Parts 314 and 601... Approved Drugs and Biological Products; Correction and Extension of Comment Period AGENCY: Food and Drug Administration, HHS. ACTION: Proposed rule; correction and extension of comment period. SUMMARY: The Food and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wickline, Alfred
2004-04-01
This Corrective Action Decision Document (CADD) has been prepared for Corrective Action Unit (CAU) 204 Storage Bunkers, Nevada Test Site (NTS), Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE); and the U.S. Department of Defense (FFACO, 1996). The NTS is approximately 65 miles (mi) north of Las Vegas, Nevada (Figure 1-1). The Corrective Action Sites (CASs) within CAU 204 are located in Areas 1, 2, 3, and 5 of the NTS, in Nye County, Nevada (Figure 1-2). Corrective Action Unit 204 ismore » comprised of the six CASs identified in Table 1-1. As shown in Table 1-1, the FFACO describes four of these CASs as bunkers one as chemical exchange storage and one as a blockhouse. Subsequent investigations have identified four of these structures as instrumentation bunkers (CASs 01-34-01, 02-34-01, 03-34-01, 05-33-01), one as an explosives storage bunker (CAS 05-99-02), and one as both (CAS 05-18-02). The six bunkers included in CAU 204 were primarily used to monitor atmospheric testing or store munitions. The ''Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada'' (NNSA/NV, 2002a) provides information relating to the history, planning, and scope of the investigation; therefore, it will not be repeated in this CADD. This CADD identifies potential corrective action alternatives and provides a rationale for the selection of a recommended corrective action alternative for each CAS within CAU 204. The evaluation of corrective action alternatives is based on process knowledge and the results of investigative activities conducted in accordance with the CAIP (NNSA/NV, 2002a) that was approved prior to the start of the Corrective Action Investigation (CAI). Record of Technical Change (ROTC) No. 1 to the CAIP (approval pending) documents changes to the preliminary action levels (PALs) agreed to by the Nevada Division of Environmental Protection (NDEP) and DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This ROTC specifically discusses the radiological PALs and their application to the findings of the CAU 204 corrective action investigation.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the March 2000, Corrective Action Decision Document / Closure Report for Corrective Action Unit 406: Area 3 Building 03-74 & 03-58 Underground Discharge Points and Corrective Action Unit 429: Area 3 Building 03-55 & Area 9 Building 09-52 Underground Discharge Points (TTR) as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. Themore » approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-51-001-0355 – Photo Shop UDP, Drains in CAU 429. It should be noted that there are no changes to CAU 406. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dave Madsen
This Closure Report provides the documentation for closure of the Cactus Spring Waste Trenches Corrective Action Unit (CAU) 426. The site is located on the Tonopah Test Range, approximately 225 kilometers northwest of Las Vegas, NV. CAU 426 consists of one corrective action site (CAS) which is comprised of four waste trenches. The trenches were excavated to receive solid waste generated in support of Operation Roller Coaster, primary the Double Tracks Test in 1963, and were subsequently backfilled. The Double Tracks Test involved use of live animals to assess the biological hazards associated with the nonnuclear detonation of plutonium-bearing devices.more » The Nevada Division of Environmental Protection approved Corrective Action Plan (CAP)which proposed ''capping'' methodology. The closure activities were completed in accordance with the approved CAP and consisted of constructing an engineered cover in the area of the trenches, constructing/planting a vegetative cover, installing a perimeter fence and signs, implementing restrictions on future use, and preparing a Post-Closure Monitoring Plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the August 2001, Corrective Action Decision Document / Closure Report for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 22-99-05, Fuel Storage Area. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krauss, Mark J
This document constitutes an addendum to the Closure Report for Corrective Action Unit 165: Area 25 and 26 Dry Well and Washdown Areas, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with themore » UR Removal document, this addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-20-01, Lab Drain Dry Well. This UR was established as part of FFACO corrective actions and was based on the presence of tetrachloroethene contamination at concentrations greater than the action level established at the time of the initial investigation. Although total petroleum hydrocarbon diesel-range organics contamination at concentrations greater than the NDEP action level was present at the site, no hazardous constituents of TPH-DRO exceeded the U.S. Environmental Protection Agency (EPA) Region 9 preliminary remediation goals established at the time of the initial investigation.« less
Soils Project Risk-Based Corrective Action Evaluation Process with ROTC 1 and ROTC 2, Revision 0
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick; Sloop, Christina
2012-04-01
This document formally defines and clarifies the NDEP-approved process the NNSA/NSO Soils Activity uses to fulfill the requirements of the FFACO and state regulations. This process is used to establish FALs in accordance with the risk-based corrective action (RBCA) process stipulated in Chapter 445 of the Nevada Administrative Code (NAC) as described in the ASTM International (ASTM) Method E1739-95 (NAC, 2008; ASTM, 1995). It is designed to provide a set of consistent standards for chemical and radiological corrective actions.
77 FR 43111 - Indian Gaming; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-23
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Indian Gaming; Correction AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice of Approved Tribal--State Class III Gaming Compact; Correction. SUMMARY: The Bureau of Indian Affairs (BIA) published a document in the Federal Register of July 12, 2012...
DOE Office of Scientific and Technical Information (OSTI.GOV)
T. M. Fitzmaurice
2001-04-01
The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action at the Test Cell A Leachfield System and to provide data confirming the corrective action. The Test Cell A Leachfield System is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Corrective Action Unit (CAU) 261. Remediation of CAU 261 is required under the FFACO (1996). CAU 261 is located in Area 25 of the Nevada Test Site (NTS) which is approximately 140 kilometers (87 miles) northwest of Las Vegas, Nevada (Figure 1). CAU 261 consists of two Corrective Actionmore » Sites (CASS): CAS 25-05-01, Leachfield; and CAS 25-05-07, Acid Waste Leach Pit (AWLP) (Figures 2 and 3). Test Cell A was operated during the 1960s and 1970s to support the Nuclear Rocket Development Station. Various operations within Building 3124 at Test Cell A resulted in liquid waste releases to the Leachfield and the AWLP. The following existing site conditions were reported in the Corrective Action Decision Document (CADD) (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1999): Soil in the leachfield was found to exceed the Nevada Division of Environmental Protection (NDEP) Action Level for petroleum hydrocarbons, the U.S. Environmental Protection Agency (EPA) preliminary remediation goals for semi volatile organic compounds, and background concentrations for strontium-90; Soil below the sewer pipe and approximately 4.5 meters (m) (15 feet [ft]) downstream of the initial outfall was found to exceed background concentrations for cesium-137 and strontium-90; Sludge in the leachfield septic tank was found to exceed the NDEP Action Level for petroleum hydrocarbons and to contain americium-241, cesium-137, uranium-234, uranium-238, potassium-40, and strontium-90; No constituents of concern (COC) were identified at the AWLP. The NDEP-approved CADD (DOWNV, 1999) recommended Corrective Action Alternative 2, ''Closure of the Septic Tank and Distribution Box, Partial Excavation, and Administrative Controls.'' The corrective action was performed following the NDEP-approved Corrective Action Plan (CAP) (DOE/NV, 2000).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
Corrective Action Unit (CAU) 371 is located in Areas 11 and 18 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 371 is comprised of the two corrective action sites (CASs) listed below: • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate correctivemore » action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on November 19, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 371. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 371 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Measure in situ external dose rates using thermoluminescent dosimeters or other dose measurement devices. • Collect and submit environmental samples for laboratory analysis to determine internal dose rates. • Combine internal and external dose rates to determine whether total dose rates exceed final action levels (FALs). • Collect and submit environmental samples for laboratory analysis to determine whether chemical contaminants are present at concentrations exceeding FALs. • If contamination exceeds FALs, define the extent of the contamination exceeding FALs. • Investigate waste to determine whether potential source material is present. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy; and U.S. Department of Defense. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
BECHTEL NEVADA
This Closure Report (CR) documents the closure activities for Corrective Action Unit (CAU) 165, Area 25 and 26 Dry Well and Washdown Areas, according to the Federal Facility Agreement and Consent Order (FFACO) of 1996. CAU 165 consists of 8 Corrective Action Sites (CASs) located in Areas 25 and 26 of the Nevada Test Site (NTS). The NTS is located approximately 105 kilometers (65 miles) northwest of Las Vegas, nevada. Site closure activities were performed according to the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 165. CAU 165 consists of the following CASs: (1) CASmore » 25-07-06, Train Decontamination Area; (2) CAS 25-07-07, Vehicle Washdown; (3) CAS 25-20-01, Lab Drain Dry Well; (4) CAS 25-47-01, Reservoir and French Drain; (5) CAS 25-51-02, Drywell; (6) CAS 25-59-01, Septic System; (7) CAS 26-07-01, Vehicle Washdown Station; and (8) CAS 26-59-01, Septic System. CAU 165, Area 25 and 26 Dry Well and Washdown Areas, consists of eight CASs located in Areas 25 and 26 of the NTS. The approved closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls.« less
Report: Follow-Up Review - EPA Updated Information for Indoor Mold Research Tools
Report #16-P-0308, September 8, 2016. Corrective actions taken by the EPA should help ensure that the public has correct information about EPA approved technology and tools for evaluating indoor mold.
42 CFR 410.143 - Requirements for approved accreditation organizations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 2 2014-10-01 2014-10-01 false Requirements for approved accreditation organizations. 410.143 Section 410.143 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF... decisions and any accreditation-related information that CMS may require (including corrective action plans...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alfred Wickline
2009-04-01
Corrective Action Unit 562 is located in Areas 2, 23, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 562 is comprised of the 13 corrective action sites (CASs) listed below: • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drain • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Buildingmore » 3123 Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 11, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 562. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 562 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Perform field screening. • Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. • Collect samples of source material to determine the potential for a release. • Collect samples of potential remediation wastes. • Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.« less
75 FR 70067 - Notice of Request for Reinstatement of Previously Approved Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-16
... address for which the public should request further information related to the relevant Information... Request for Reinstatement of Previously Approved Information Collection ACTION: Notice; Correction SUMMARY... INFORMATION CONTACT: Robert C. Ashby, Office of the Secretary, Office of Assistant General Counsel for...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-17
... CONSUMER PRODUCT SAFETY COMMISSION Proposed Extension of Approval of Information Collection; Comment Request--Children's Sleepwear AGENCY: Consumer Product Safety Commission. ACTION: Notice; correction. SUMMARY: As required by the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35), the Consumer...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
Corrective Action Unit (CAU) 224 is located in Areas 02, 03, 05, 06, 11, and 23 of the Nevada Test Site, which is situated approximately 65 miles northwest of Las Vegas, Nevada. CAU 224 is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Decon Pad and Septic Systems and is comprised of the following nine Corrective Action Sites (CASs): CAS 02-04-01, Septic Tank (Buried); CAS 03-05-01, Leachfield; CAS 05-04-01, Septic Tanks (4)/Discharge Area; CAS 06-03-01, Sewage Lagoons (3); CAS 06-05-01, Leachfield; CAS 06-17-04, Decon Pad and Wastewater Catch; CAS 06-23-01, Decon Pad Discharge Piping; CASmore » 11-04-01, Sewage Lagoon; and CAS 23-05-02, Leachfield. The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 02-04-01, 03-05-01, 06-03-01, 11-04-01, and 23-05-02 is no further action. As a best management practice, the septic tanks and distribution box were removed from CASs 02-04-01 and 11-04-01 and disposed of as hydrocarbon waste. The NDEP-approved correction action alternative for CASs 05-04-01, 06-05-01, 06-17-04, and 06-23-01 is clean closure. Closure activities for these CASs included removing and disposing of radiologically and pesticide-impacted soil and debris. CAU 224 was closed in accordance with the NDEP-approved CAU 224 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 224 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2005). This Closure Report documents CAU 224 closure activities. During closure activities, approximately 60 cubic yards (yd3) of mixed waste in the form of soil and debris; approximately 70 yd{sup 3} of sanitary waste in the form of soil, liquid from septic tanks, and concrete debris; approximately 10 yd{sup 3} of hazardous waste in the form of pesticide-impacted soil; approximately 0.5 yd{sup 3} of universal waste in the form of fluorescent light bulbs; and approximately 0.5 yd{sup 3} of low-level waste in the form of a radiologically impacted fire hose rack were generated, managed, and disposed of appropriately. Waste minimization techniques, such as the utilization of laboratory analysis and field screening to guide the extent of excavations, were employed during the performance of closure work.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada (Revision 1), December 2002 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • Themore » cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 06-25-01, CP-1 Heating Oil Release. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for Corrective Action Unit 403: Second Gas Station, Tonopah Test Range, Nevada, September 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pagesmore » of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-004-0360, Underground Storage Tanks. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits, Nevada Test Site, Nevada, January 2004 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title,more » and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 19-09-05, Mud Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-29
... DEPARTMENT OF LABOR Office of the Secretary Agency Information Collection Activities; Submission for OMB Review; Comment Request; Worker Classification Survey; Correction ACTION: Notice; correction... titled, ``Worker Classification Survey,'' to the Office of Management and Budget for review and approval...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Navarro Nevada Environmental Services
In Appendix 0, Use Restriction (UR) Form, the drawing of the use restricted area shows the incorrect coordinates for the use restricted area, the coordinates on the drawing do not match the approved UR Form. The coordinates have been verified and this Errata Sheet replaces the drawing of the use restricted area with an aerial photo showing the use restricted area and the correct coordinates that match the approved UR Form.
12 CFR 702.305 - Prompt corrective action for “uncapitalized” new credit unions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... amount reflected in the credit union's approved initial or revised business plan; (2) Submit revised business plan. Submit a revised business plan within the time provided by § 702.306, providing for... increased its net worth ratio consistent with its then-present approved business plan; (ii) Has no then...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-27
..., where ArcelorMittal is located. Emission inventories and modeling parameters had improved, and through...; therefore, this corrective action has no impact on the approved SIP or the modeling conducted to support it... gas combustion that were used in the modeling to demonstrate attainment. The flares were not...
2014-10-01
A.J. Mendez, S.L. Groah, J. Kressler. Fasting plasma glucose values may significantly underestimate prevalence of dysfunctional glycemic regulation in...taken corrective actions without undertaking additional protocol changes. There have been no screening issues since protocol amendments were approved...extending approval for the project through September 9, 2015. Enclosed is the dated/stamped Informed Consent Form, approved for one additional year until
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-09
... tons per day of municipal solid waste (MSW). This action corrects an error in the regulatory language... per day of municipal solid waste (MSW), and for which construction, reconstruction, or modification... Municipal Waste Combustor (LMWC) Emissions From Existing Facilities; Correction AGENCY: Environmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-20
... 52.2424(c) for the Fredericksburg Area. This action corrects these oversights. Section 553 of the... Plan for the Fredericksburg Area to read as follows: Sec. 52.2420 Identification of plan. * * * * * (e... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R03-OAR-2012-0444; FRL-9760-9] Approval and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-22
...: Florine Purdie, Center for Drug Evaluation and Research, Food and Drug Administration, 10903 New Hampshire... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2011-N-0411... Drug Applications; Correction AGENCY: Food and Drug Administration, HHS. ACTION: Notice; correction...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-19
... INFORMATION CONTACT: Florine Purdie, Center for Drug Evaluation and Research, Food and Drug Administration... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2009-N-0026... Applications; Correction AGENCY: Food and Drug Administration, HHS. ACTION: Notice; correction. SUMMARY: The...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-13
... correctional officers, such as the proportion who have body armor, the rate of use, the decision-making factors... Collection; Comments Requested; Body Armor in Correctional Institutions Survey ACTION: 60-day notice of... Collection: Establishment survey and initial approval of collection. (2) Title of Form/Collection: Body Armor...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 1999, Closure Report for Corrective Action Unit 427: Area 3 Septic Waste Systems 2, 6, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 03-05-002-SW02, Septic Waste System • CAS 03-05-002-SW06, Septic Waste System These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 25-25-09, Spill H940825C (from UST 25-3101-1) • 25-25-14, Spill H940314E (from UST 25-3102-3) • 25-25-15, Spill H941020E (from UST 25-3152-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 1998, Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-25-09, Spill 960722-02 (from UST 12-B-3). This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the June 2003, Closure Report for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 06-20-02, 20-inch Cased Hole • CAS 06-23-03, Drain Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the November 2002, Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: •more » This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 03-04-01, Area 3 Change House Septic System • CAS 03-09-04, Mud Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 2003, Closure Report for Corrective Action Unit 398: Area 25 Spill Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-25-17, Subsurface Hydraulic Oil Spill. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 12-25-08, Spill H950524F (from UST 12-B-1) • 12-25-10, Spill H950919A (from UST 12-COMM-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the July 1999, Closure Report for Corrective Action Unit 423: Area 3 Building 0360 Underground Discharge Point, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-002-0308, Underground Discharge Point. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 2006, Closure Report for Corrective Action Unit 214: Bunkers and Storage Areas as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 25-23-01, Contaminated Materials • CAS 25-23-19, Radioactive Material Storage These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 2000, Closure Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of:more » • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 23-56-01, Former Mercury Fire Training Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the June 2006, Closure Report for Corrective Action Unit 322: Areas 1 & 3 Release Sites and Injection Wells as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 01-25-01, AST Release • CAS 03-25-03, Mud Plant AST Diesel Release These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
CSAPR June Revisions Rule (77 FR 34830)
EPA takes final action on revisions to the final Transport Rule (Federal Implementation Plans: Interstate Transport of Fine Particulate Matter and Ozone and Correction of SIP Approvals, published August 8, 2011).
7 CFR 3560.707 - Program participation and corrective actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... tenant, who has received unauthorized assistance, may continue to participate in the project if they have the legal and financial capabilities to do so. Approval considerations for such forbearance and...
Code of Federal Regulations, 2010 CFR
2010-01-01
... net worth by the amount reflected in its approved initial or revised business plan and quarterly... plan. Submit a revised business plan within the time provided by § 702.306 if the credit union either: (i) Has not increased its net worth ratio consistent with its then-present approved business plan...
Closure Report for Corrective Action Unit 340: NTS Pesticide Release Sites Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
C. M. Obi
The purpose of this report is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed in accordance with the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999) and consisted of clean closure by excavation and disposal. The Area 15 Quonset Hut 15-11 was formerly used for storage of farm supplies including pesticides, herbicides, and fertilizers. The Area 23 Quonset Hut 800 was formerly used to clean pesticide and herbicide equipment. Steam-cleaning rinsate and sink drainage occasionally overflowed a sump into adjoining drainage ditches. One ditchmore » flows south and is referred to as the quonset hut ditch. The other ditch flows southeast and is referred to as the inner drainage ditch. The Area 23 Skid Huts were formerly used for storing and mixing pesticide and herbicide solutions. Excess solutions were released directly to the ground near the skid huts. The skid huts were moved to a nearby location prior to the site characterization performed in 1998 and reported in the Corrective Action Decision Document (CADD) (DOE, 1998). The vicinity and site plans of the Area 23 sites are shown in Figures 2 and 3, respectively.« less
CSAPR Direct Final Rule (77 FR 10342)
EPA takes direct final action on additional revisions to the final Transport Rule (Federal Implementation Plans: Interstate Transport of Fine Particulate Matter and Ozone and Correction of SIP Approvals published August 8, 2011).
75 FR 27463 - List of Approved Spent Fuel Storage Casks: NUHOMS® HD System Revision 1; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-17
... Fuel Storage Casks: NUHOMS[supreg] HD System Revision 1; Correction AGENCY: Nuclear Regulatory... fuel storage casks to add revision 1 to the NUHOMS HD spent fuel storage cask system. This action is... Federal Register on May 7, 2010 (75 FR 25120), that proposes to amend the regulations that govern storage...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the August 2004, Closure Report for Corrective Action Unit 271, Areas 25, 26, and 27 Septic Systems as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the modification of the UR for CAS 27-05-02, Leachfield. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify the UR to an administrative UR. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). This Administrative UR was based on an “Occasional Use Area” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 400 total work hours). Any proposed activity within this use restricted area that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining postings at this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the January 2004, Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of:more » • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 20-23-02, Postshot Cellar • CAS 20-23-03, Cellar • CAS 20-23-04, Postshot Cellar • CAS 20-23-05, Postshot Cellar • CAS 20-23-06, Cellar • CAS 20-37-01, Cellar & Mud Pit • CAS 20-37-05, Cellar These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 2003, Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 12-25-04, UST 12-16-2 Waste Oil Release • CAS 18-25-01, Oil Spills • CAS 18-25-02, Oil Spills • CAS 18-25-03, Oil Spill • CAS 29-44-01, Fuel Spill These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Discharge Area Nevada Test Site, December 1997 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, andmore » signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-19-01, A12 Fleet Ops Steam Cleaning Efflu. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-14
...EPA is taking final action to disapprove revisions to the SIP submitted by the State of Texas that relate to the Modification of Existing Qualified Facilities (the Qualified Facilities Program or the Program). EPA is disapproving the Texas Qualified Facilities Program because it does not meet the Minor NSR SIP requirements nor does it meet the NSR SIP requirements for a substitute Major NSR SIP revision. EPA is also approving three definitions that are severable from the Qualified Facilities submittals. These three definitions we are approving are, ``grandfathered facility,'' ``maximum allowable emission rate table (MAERT),'' and ``new facility.'' Moreover, we are making an administrative correction to the SIP-approved definition of ``facility.'' We are taking this action under section 110, part C, and part D of the Federal Clean Air Act (the Act or CAA).
NPDES Petition for Program Withdrawal in Minnesota: Documents related to the Minnesota Center for Environmental Advocacy (MCEA) Petition for Corrective Action or Withdrawal of NPDES Program Approval from the State of Minnesota.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pat Matthews
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 117, Pluto Disassembly Facility, identified in the Federal Facility Agreement and Consent Order. Corrective Action Unit 117 consists of one Corrective Action Site (CAS), CAS 26-41-01, located in Area 26 of the Nevada Test Site. This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 26-41-01. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closuremore » of CAU 117 using the SAFER process. Additional information will be obtained by conducting a field investigation before finalizing the appropriate corrective action for this CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary following SAFER activities. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated to meet the data quality objectives (DQOs) developed on June 27, 2007, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 26-41-01 in CAU 117.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 1998, Closure Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the modification of the UR for CAS TA-03-001-TARC Roller Coaster Lagoons. This UR was established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and was based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This reevaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify the UR for CAS TA-03-001-TARC to an administrative UR. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). This Administrative UR was based on a “Remote Work Sites” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 336 hours per year). Any proposed activity within these use restricted areas that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 1998, Closure Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS TA-03-001-TARC Roller Coaster Lagoons • CAS TA-21-001-TARC Roller Coaster N. Disposal Trench These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify these URs to administrative URs. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). These Administrative URs were based on a “Remote Work Sites” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 336 hours per year). Any proposed activity within these use restricted areas that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
21 CFR 58.35 - Quality assurance unit.
Code of Federal Regulations, 2013 CFR
2013-04-01
... the corrective actions taken. (5) Determine that no deviations from approved protocols or standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating procedures, and...
21 CFR 58.35 - Quality assurance unit.
Code of Federal Regulations, 2010 CFR
2010-04-01
... the corrective actions taken. (5) Determine that no deviations from approved protocols or standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating procedures, and...
21 CFR 58.35 - Quality assurance unit.
Code of Federal Regulations, 2012 CFR
2012-04-01
... the corrective actions taken. (5) Determine that no deviations from approved protocols or standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating procedures, and...
21 CFR 58.35 - Quality assurance unit.
Code of Federal Regulations, 2011 CFR
2011-04-01
... the corrective actions taken. (5) Determine that no deviations from approved protocols or standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating procedures, and...
21 CFR 58.35 - Quality assurance unit.
Code of Federal Regulations, 2014 CFR
2014-04-01
... the corrective actions taken. (5) Determine that no deviations from approved protocols or standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating procedures, and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pastor, Laura
2005-12-01
This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 555: Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 555 is located in Areas 1, 3 and 6 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada,more » and is comprised of the five corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-59-01, Area 1 Camp Septic System; (2) CAS 03-59-03, Core Handling Building Septic System; (3) CAS 06-20-05, Birdwell Dry Well; (4) CAS 06-59-01, Birdwell Septic System; and (5) CAS 06-59-02, National Cementers Septic System. An FFACO modification was approved on December 14, 2005, to include CAS 06-20-05, Birdwell Dry Well, as part of the scope of CAU 555. The work scope was expanded in this document to include the investigation of CAS 06-20-05. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 555 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before the evaluation and selection of corrective action alternatives.« less
1988-08-31
behavior/operational goals so tnat corrective action may be taken. Data produced by the IS activities form the basis for design/--1pport trade-offs while...rt7L:EC T Ef Approved for public release; distribution unlimited c R SOUTHWEST RESEARCH INSTITUTE SAN ANTONIO HOUSTON I SECURITY CLASSIFICATION OF THIS...DISTRIBUTION/AVAILABLITY OF REPORT Approved for public release; 2b. DECLASSIFICATION I DOWNGRADING SCHEDULE distribution unlimited 4 PERFORMING ORGANIZATION
14 CFR 142.55 - Training center evaluator requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... corrective action; and (4) If evaluating in qualified and approved flight training equipment must satisfactorily pass a written test and annual proficiency check in a flight simulator or aircraft in which the... (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES TRAINING CENTERS Personnel and Flight Training Equipment...
14 CFR 142.55 - Training center evaluator requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... corrective action; and (4) If evaluating in qualified and approved flight training equipment must satisfactorily pass a written test and annual proficiency check in a flight simulator or aircraft in which the... (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES TRAINING CENTERS Personnel and Flight Training Equipment...
14 CFR 142.55 - Training center evaluator requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... corrective action; and (4) If evaluating in qualified and approved flight training equipment must satisfactorily pass a written test and annual proficiency check in a flight simulator or aircraft in which the... (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES TRAINING CENTERS Personnel and Flight Training Equipment...
14 CFR 142.55 - Training center evaluator requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... corrective action; and (4) If evaluating in qualified and approved flight training equipment must satisfactorily pass a written test and annual proficiency check in a flight simulator or aircraft in which the... (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES TRAINING CENTERS Personnel and Flight Training Equipment...
14 CFR 142.55 - Training center evaluator requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... corrective action; and (4) If evaluating in qualified and approved flight training equipment must satisfactorily pass a written test and annual proficiency check in a flight simulator or aircraft in which the... (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES TRAINING CENTERS Personnel and Flight Training Equipment...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-22
... DEPARTMENT OF JUSTICE [OMB Number 1105-0030] Justice Management Division, Office of Attorney Recruitment and Management; Agency Information Collection Activities: Proposed Renewal of Previously Approved Collection; Comments Requested ACTION: Correction 30-Day Notice of Information Collection Under Review: [[Page 13574
In this action, EPA limits the interstate transport of emissions of nitrogen oxides (NOX) and sulfur dioxide (SO2) that contribute to harmful levels of fine particle matter (PM2.5) and ozone in downwind states.
Code of Federal Regulations, 2012 CFR
2012-01-01
... teaching-learning process; (ii) Teaching methods and procedures; and (iii) The instructor-student... policies and procedures. (3) The appropriate methods, procedures, and techniques for conducting flight...) The corrective action in the case of unsatisfactory training progress. (6) The approved methods...
Code of Federal Regulations, 2011 CFR
2011-01-01
... teaching-learning process; (ii) Teaching methods and procedures; and (iii) The instructor-student... policies and procedures. (3) The appropriate methods, procedures, and techniques for conducting flight...) The corrective action in the case of unsatisfactory training progress. (6) The approved methods...
Code of Federal Regulations, 2013 CFR
2013-01-01
... teaching-learning process; (ii) Teaching methods and procedures; and (iii) The instructor-student... policies and procedures. (3) The appropriate methods, procedures, and techniques for conducting flight...) The corrective action in the case of unsatisfactory training progress. (6) The approved methods...
Code of Federal Regulations, 2010 CFR
2010-01-01
... teaching-learning process; (ii) Teaching methods and procedures; and (iii) The instructor-student... policies and procedures. (3) The appropriate methods, procedures, and techniques for conducting flight...) The corrective action in the case of unsatisfactory training progress. (6) The approved methods...
Final voluntary release assessment/corrective action report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-11-12
The US Department of Energy, Carlsbad Area Office (DOE-CAO) has completed a voluntary release assessment sampling program at selected Solid Waste Management Units (SWMUs) at the Waste Isolation Pilot Plant (WIPP). This Voluntary Release Assessment/Corrective Action (RA/CA) report has been prepared for final submittal to the Environmental protection Agency (EPA) Region 6, Hazardous Waste Management Division and the New Mexico Environment Department (NMED) Hazardous and Radioactive Materials Bureau to describe the results of voluntary release assessment sampling and proposed corrective actions at the SWMU sites. The Voluntary RA/CA Program is intended to be the first phase in implementing the Resourcemore » Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and corrective action process at the WIPP. Data generated as part of this sampling program are intended to update the RCRA Facility Assessment (RFA) for the WIPP (Assessment of Solid Waste Management Units at the Waste Isolation Pilot Plant), NMED/DOE/AIP 94/1. This Final Voluntary RA/CA Report documents the results of release assessment sampling at 11 SWMUs identified in the RFA. With this submittal, DOE formally requests a No Further Action determination for these SWMUs. Additionally, this report provides information to support DOE`s request for No Further Action at the Brinderson and Construction landfill SWMUs, and to support DOE`s request for approval of proposed corrective actions at three other SWMUs (the Badger Unit Drill Pad, the Cotton Baby Drill Pad, and the DOE-1 Drill Pad). This information is provided to document the results of the Voluntary RA/CA activities submitted to the EPA and NMED in August 1995.« less
Code of Federal Regulations, 2014 CFR
2014-01-01
...-learning process; (ii) Teaching methods and procedures; and (iii) The instructor-student relationship. (d... procedures. (3) The appropriate methods, procedures, and techniques for conducting flight instruction. (4... corrective action in the case of unsatisfactory training progress. (6) The approved methods, procedures, and...
40 CFR 264.552 - Corrective Action Management Units (CAMU).
Code of Federal Regulations, 2014 CFR
2014-07-01
... (FML), and the lower component must consist of at least a two-foot layer of compacted soil with a... hazardous wastes, and all media (including ground water, surface water, soils, and sediments) and debris... with the compacted soil component; (ii) Alternate requirements. The Regional Administrator may approve...
40 CFR 264.552 - Corrective Action Management Units (CAMU).
Code of Federal Regulations, 2012 CFR
2012-07-01
... (FML), and the lower component must consist of at least a two-foot layer of compacted soil with a... hazardous wastes, and all media (including ground water, surface water, soils, and sediments) and debris... with the compacted soil component; (ii) Alternate requirements. The Regional Administrator may approve...
40 CFR 264.552 - Corrective Action Management Units (CAMU).
Code of Federal Regulations, 2010 CFR
2010-07-01
... (FML), and the lower component must consist of at least a two-foot layer of compacted soil with a... hazardous wastes, and all media (including ground water, surface water, soils, and sediments) and debris... with the compacted soil component; (ii) Alternate requirements. The Regional Administrator may approve...
40 CFR 264.552 - Corrective Action Management Units (CAMU).
Code of Federal Regulations, 2011 CFR
2011-07-01
... (FML), and the lower component must consist of at least a two-foot layer of compacted soil with a... hazardous wastes, and all media (including ground water, surface water, soils, and sediments) and debris... with the compacted soil component; (ii) Alternate requirements. The Regional Administrator may approve...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the November 2003, Closure Report for Corrective Action Unit 355: Area 2 Cellars/Mud Pits as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 02-37-01, Cellar & Mud Pit • CAS 02-37-03, Cellar & Mud Pit • CAS 02-37-04, Cellar & Mud Pit • CAS 02-37-05, Cellar & Mud Pit • CAS 02-37-06, Cellar & Mud Pit • CAS 02-37-07, Cellar & Mud Pit • CAS 02-37-10, Cellar & Mud Pit • CAS 02-37-11, Cellar & Mud Pit • CAS 02-37-12, Cellar & Mud Pit • CAS 02-37-13, Cellar & Mud Pit • CAS 02-37-14, Cellar & Mud Pit • CAS 02-37-15, Cellar & Mud Pit • CAS 02-37-16, Cellar & Mud Pit • CAS 02-37-17, Cellar • CAS 02-37-18, Cellar & Tanks These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2011-08-31
This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information andmore » process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-21
... Matter and Ozone AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is...: Interstate Transport of Fine Particulate Matter and Ozone and Correction of SIP Approvals, published August 8... ) and sulfur dioxide (SO 2 ) that contribute harmful levels of fine particle matter and ozone in...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-12
... effort to reduce paperwork and respondent burden, invites the general public and other Federal agencies... on the proposal. The FDIC hereby gives notice of its plan to submit to OMB a request to approve... Corrective Action (77 FR 52792); Regulatory Capital Rules: Standardized Approach for Risk-Weighted Assets...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-22
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [FDMS Docket No. EPA-R03-OAR-2011-0511; FRL-9609-1... Maintenance Areas; Correction AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule..., Parkersburg, Weirton, and Wheeling 8-hour ozone maintenance areas. The previous rulemaking amended the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-05
... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service [Docket No. AMS-DA-10-0070; DA-10-06...: Agricultural Marketing Service, USDA. ACTION: Notice and request for comments; correction. SUMMARY: The Agricultural Marketing Service published a document in the Federal Register of October 1, 2010, concerning a...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-12
... Emission Standards for Hazardous Air Pollutants (NESHAP) for Iron and Steel Foundries (40 CFR part 63... foundries that are major sources of hazardous air pollutant (HAP) emissions. The rule applies to emissions... lead compounds, and identify the date, time, cause, and corrective actions taken for all bag-leak...
12 CFR 702.203 - Prompt corrective action for “significantly undercapitalized” credit unions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... to increase except as provided in § 702.202(a)(3) and (4) Restrict member business loans. Not increase the total dollar amount of member business loans (defined as loans outstanding and unused... this part: (1) Requiring prior approval for acquisitions, branching, new lines of business. Prohibit a...
12 CFR 702.204 - Prompt corrective action for “critically undercapitalized” credit unions
Code of Federal Regulations, 2011 CFR
2011-01-01
... to increase except as provided in § 702.202(a)(3); and (4) Restrict member business loans. Not increase the total dollar amount of member business loans (defined as loans outstanding and unused... part: (1) Requiring prior approval for acquisitions, branching, new lines of business. Prohibit a...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-30
...EPA is correcting its previous full approval of Texas's Clean Air Act (CAA) Prevention of Significant Deterioration (PSD) program to be a partial approval and partial disapproval. The state did not address, or provide adequate legal authority for, the program's application to all pollutants that would become newly subject to regulation in the future, including non-National Ambient Air Quality Standard (NAAQS) pollutants, among them greenhouse gases (GHGs). Further, EPA is promulgating a federal implementation plan (FIP), as required following the partial disapproval, to establish a PSD permitting program in Texas for GHG-emitting sources. EPA is taking this action through interim final rulemaking, effective upon publication, to ensure the availability of a permitting authority-- EPA--in Texas for GHG-emitting sources when they become subject to PSD on January 2, 2011. This will allow those sources to proceed with plans to construct or expand. This rule will expire on April 30, 2011. EPA is also proposing a notice-and-comment rulemaking that mirrors this rulemaking.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-26
...) of the Administrative Procedure Act (APA) which, upon finding ``good cause,'' authorizes agencies to... is good cause under APA section 553(d)(3) for this correction to become effective on the date of publication of this action. Section 553(d)(3) of the APA allows an effective date less than 30 days after...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-12
... Matter and Ozone AGENCY: Environmental Protection Agency (EPA). ACTION: Announcement of public hearing... Ozone'', which was signed on October 6, 2011 and posted on EPA's website on October 6, 2011. The hearing... Particulate Matter and Ozone and Correction of SIP Approvals). EPA is proposing to amend the assurance penalty...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick K.
2015-03-01
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 411, Double Tracks Plutonium Dispersion (Nellis). CAU 411 is located on the Nevada Test and Training Range and consists of a single corrective action site (CAS), NAFR-23-01, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1996 interim corrective action to recommend closure of CAU 411 using the SAFER process. Based on existing data, the presumed corrective action for CAU 411 is clean closure. However, additional data will be obtained during a field investigationmore » to document and verify the adequacy of existing information, and to determine whether the CAU 411 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU. The results of the field investigation will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated based on the data quality objectives (DQOs) developed on November 20, 2014, by representatives of NDEP, the U.S. Air Force (USAF), and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine whether CAU 411 closure objectives have been achieved. The following text summarizes the SAFER activities that will support the closure of CAU 411; Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information; If COCs are no longer present, establish clean closure as the corrective action; If COCs are present, the extent of contamination will be defined and further corrective actions will be evaluated with the stakeholders (NDEP, USAF); and Confirm the preferred closure option is sufficient to protect human health and the environment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2008-04-01
Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activitiesmore » were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.« less
NASA Technical Reports Server (NTRS)
Kelle, Pido I.; Ratterman, Christian; Gibbs, Cecil
2009-01-01
This slide presentation reviews the Constellation Program Problem Reporting, Analysis and Corrective Action Process and System (Cx PRACA). The goal of the Cx PRACA is to incorporate Lessons learned from the Shuttle, ISS, and Orbiter programs by creating a single tool for managing the PRACA process, that clearly defines the scope of PRACA applicability and what must be reported, and defines the ownership and responsibility for managing the PRACA process including disposition approval authority. CxP PRACA is a process, supported by a single information gathering data module which will be integrated with a single CxP Information System, providing interoperability, import and export capability making the CxP PRACA a more effective and user friendly technical and management tool.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-02
... in section 553(b)(3)(B) of the Administrative Procedure Act (APA) which, upon finding ``good cause.... EPA also finds that there is good cause under APA section 553(d)(3) for this correction to become effective on the date of publication of this action. Section 553(d)(3) of the APA allows an effective date...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-12
...'' exemption in section 553(b)(3)(B) of the Administrative Procedure Act (APA) which, upon finding ``good cause.... EPA also finds that there is good cause under APA section 553(d)(3) for this correction to become effective on the date of publication of this action. Section 553(d)(3) of the APA allows an effective date...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-30
...) for Texas. This action is based on EPA's determination that Texas's PSD program is flawed because the...://www.regulations.gov Web site is an ``anonymous access'' system, which means EPA will not know your... open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-23
... Salicylic Acid AGENCY: Food and Drug Administration, HHS. ACTION: Final rule; correcting amendments. SUMMARY...) and as Sec. 556.550 (40 FR 13802 at 13956). 12. Salicylic acid (Sec. 556.590). In 2005, FDA acknowledged the voluntary withdrawal of approval of salicylic acid for use in cattle under NADA 010-481 and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Corrective Action Unit (CAU) 390 consists four Corrective Action Sites (CASs) located in Areas 9, 10, and 12 of the Nevada Test Site. The closure activities performed at the CASs include: (1) CAS 09-99-03, Wax, Paraffin: 2 cubic yards of drilling polymer was removed on June 20,2005, and transported to the Area 9 Landfill for disposal. (2) CAS 10-99-01, Epoxy Tar Spill: 2 cubic feet of asphalt waste was removed on June 20,2005, and transported to the Area 9 Landfill for disposal. (3) CAS 10-99-03, Tar Spills: 3 cubic yards of deteriorated asphalt waste was removed on June 20,2005, andmore » transported to the Area 9 Landfill for disposal. (4) CAS 12-25-03, Oil Stains (2); Container: Approximately 16 ounces of used oil were removed from ventilation equipment on June 28,2005, and recycled. One CAS 10-22-19, Drums, Stains, was originally part of CAU 390 but was transferred out of CAU 390 and into CAU 550, Drums, Batteries, and Lead Materials. The transfer was approved by the Nevada Division of Environmental Protection on August 19,2005, and a copy of the approval letter is included in Appendix D of this report.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
...Under section 110(k)(6) of the Clean Air Act, EPA is proposing to correct our May 2004 final approval of revisions to the San Joaquin Valley Unified Air Pollution Control District portion of the California State Implementation Plan. EPA is also proposing to take action on three amended District rules, one of which was submitted on March 7, 2008 and the other two of which were submitted on March 17, 2009. Two of the submitted rules reflect revisions to approved District rules that provide for review of new and modified stationary sources (``new source review'' or NSR) within the District, and the third reflects revisions to an approved District rule that provides a mechanism by which existing stationary sources may be exempt from the requirement to secure a Federally-mandated operating permit. The NSR rule revisions relate to exemptions from permitting and from offsets for certain agricultural operations, to the establishment of NSR applicability and offset thresholds consistent with a classification of ``extreme'' nonattainment for the ozone standard, and to the implementation of EPA's NSR Reform Rules. With respect to the revised District NSR rules, EPA is proposing a limited approval and limited disapproval because, although the changes would strengthen the SIP, there are deficiencies in enforceability that prevent full approval. With respect to the operating permit rule, EPA is proposing a full approval. Lastly, EPA is proposing to rescind certain obsolete permitting requirements from the District portion of the California plan. If EPA were to finalize the limited approval and limited disapproval action, as proposed, then a sanctions clock, and EPA's obligation to promulgate a Federal implementation plan, would be triggered because certain revisions to the District rules that are the subject of this action are required under anti-backsliding principles established for the transition from the 1-hour to the 8-hour ozone standard.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2008-03-17
The Closure Report (CR) for Corrective Action Unit (CAU) 224, Decon Pad and Septic Systems, was approved by the Nevada Department of Environmental Protection (NDEP) on November 01, 2007. The approval letter contained the following two comments: Comment 1--For 06-05-01, 06-17-04, 06-23-01 provide evidence that the 6 inch VCP pipe originating from building CP-2 is no longer active and sealed to prevent possible future contamination. Comment 2--For the area that includes 06-03-01, provide evidence that active lines are no longer feeding the North and South lagoons and have been sealed to prevent possible future contamination. To address these comments, closuremore » documentation was reviewed, and site visits were conducted to locate and document the areas of concern. Additional fieldwork was conducted in March 2008 to seal the lines and openings described in the two comments. Photographs were taken of the closed drains and lines to document that the NDEP comments were adequately addressed and potential inadvertent discharge to the environment has been eliminated. Investigation and closure documentation was reviewed to identify the locations of potential drains, lines, and other features that could receive and/or transmit liquid. Based on the investigation findings and subsequent closure activities, no openings, distribution boxes, or other features (excluding known floor drains at CP-2) that could receive liquid were found at the CP-2 location (Figure 1), and potential manholes for the north and south sewage lagoons were identified for Corrective Action Site (CAS) 06-03-01 (Figure 2). The distribution box identified in Figure 1 was not located during the investigation and was assumed to have been previously removed.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-27
... Administrative Procedure Act (APA) which, upon finding ``good cause,'' authorizes agencies to dispense with... NAAQS into the Florida SIP. EPA also finds that there is good cause under APA section 553(d)(3) for this correction to become effective on the date of publication of this action. Section 553(d)(3) of the APA allows...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-01
... Compliance with 18 U.S.C. 922(g)(5)(B) ACTION: Correction 30-Day Notice of Information Collection. This is to... currently approved collection. (2) Title of the Form/Collection: Certificate of Compliance with 18 U.S.C...: Business or other for-profit. Other: None. Need for Collection The law of 18 U.S.C. 922(g)(5)(B) makes it...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-05
...EPA is proposing to approve revisions to the North Dakota State Implementation Plan that the Governor of North Dakota submitted with a letter dated April 6, 2009. The revisions affect North Dakota's air pollution control rules regarding general provisions (including rules regarding shutdowns and malfunctions), ambient air quality standards, emissions of particulate matter, permitting, and fees. In addition, EPA is proposing administrative corrections to the regulatory text for North Dakota that will be codified in the Code of Federal Regulations; we made errors in the identification of plan table when we approved the North Dakota State Implementation Plan revisions for Interstate Transport of pollution, which the Governor also submitted on April 6, 2009. This action is being taken under section 110 of the Clean Air Act.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss
2010-07-01
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 544, Cellars, Mud Pits, and Oil Spills, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 544 comprises the following 20 corrective action sites (CASs) located in Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada Test Site (NTS): • 02-37-08, Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mudmore » Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 544 using the SAFER process. Using the approach approved for previous mud pit investigations (CAUs 530–535), 14 mud pits have been identified that • are either a single mud pit or a system of mud pits, • are not located in a radiologically posted area, and • have no evident biasing factors based on visual inspections. These 14 mud pits are recommended for no further action (NFA), and further field investigations will not be conducted. For the sites that do not meet the previously approved closure criteria, additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible recommendation for closure of the remaining CASs in CAU 544. This will be presented in a closure report (CR) that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on April 27, 2010, by representatives of NDEP and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each CAS in CAU 544. The DQO process developed for this CAU identified the following expected closure options: (1) investigation and confirmation that no contamination exists above the final action levels (FALs) leading to an NFA declaration, (2) characterization of the nature and extent of contamination leading to closure in place with use restrictions, (3) clean closure by remediation and verification, (4) closure in place with use restrictions with no investigation if CASs are in crater areas that have been determined to be unsafe to enter, or (5) NFA if the mud pit CAS meets the criteria established during the CAUs 530–535 SAFER investigation. The following summarizes the SAFER activities that will support the closure of CAU 544: • Perform visual inspection of all CASs. • Perform site preparation activities (e.g., utilities clearances, construction of temporary site exclusion zones). • Removal of easily managed, nonhazardous, and nonradioactive debris, including vegetation (e.g., tumbleweeds), at various CASs that interfere with sampling, if required to inspect soil surface or collect soil sample. • Collect environmental samples from designated target populations (e.g., mud pits, cellars, stained soil) to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information. • If no COCs are present at a CAS, establish NFA as the corrective action. • If COCs exist, collect environmental samples from designated target populations (e.g., clean soil adjacent to contaminated soil) and submit for laboratory analyses to define the extent of COC contamination. • If a COC is present at a CAS, either - Establish clean closure as the corrective action. The material to be remediated will be removed, disposed of as waste, and verification samples will be collected from remaining soil, or - Establish closure in place as the corrective action and implement the appropriate use restrictions. • Confirm the preferred closure option is sufficient to protect human health and the environment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister
2007-09-01
This CR provides documentation and justification for the closure of CAU 118 without further corrective action. This justification is based on process knowledge and the results of the investigative and closure activities conducted in accordance with the CAU 118 SAFER Plan: Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada (NNSA/NSO, 2006). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. This CR also provides the analytical and radiological survey data to confirm that the remediation goals were met asmore » specified in the CAU 118 SAFER Plan (NNSA/NSO, 2006). The Nevada Division of Environmental Protection (NDEP) approved the CAU 118 SAFER Plan (Murphy, 2006), which recommends closure in place with use restrictions (URs).« less
Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits:Interim CQA Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
The Delphi Groupe, Inc., and J. A. Cesare and Associates, Inc.
This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. Construction was approved by the Nevada Division of Environmental Protection (NDEP) under the Approval of Corrective Action Decision Document/Corrective Action Plan (CADD/CAP)more » for Corrective Action Unit (CAU) 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada, on January 6, 2011, pursuant to Subpart XII.8a of the Federal Facility Agreement and Consent Order. The project is located in Area 5 of the Radioactive Waste Management Complex (RWMC) at the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, located in southern Nevada, approximately 65 miles northwest of Las Vegas, Nevada, in Nye County. The project site, in Area 5, is located in a topographically closed basin approximately 14 additional miles north of Mercury Nevada, in the north-central part of Frenchman Flat. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location, waste types and regulatory requirements: (1) Pit 3 Mixed Waste Disposal Unit (MWDU); (2) Corrective Action Unit (CAU) 111; (3) CAU 207; (4) Low-level waste disposal units; (5) Asbestiform low-level waste disposal units; and (6) One transuranic (TRU) waste trench.« less
49 CFR 451.16 - Action by approval authority-individual approval.
Code of Federal Regulations, 2013 CFR
2013-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.16 Action by approval authority-individual approval. (a) The...
49 CFR 451.16 - Action by approval authority-individual approval.
Code of Federal Regulations, 2011 CFR
2011-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.16 Action by approval authority-individual approval. (a) The...
49 CFR 451.16 - Action by approval authority-individual approval.
Code of Federal Regulations, 2012 CFR
2012-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.16 Action by approval authority-individual approval. (a) The...
49 CFR 451.16 - Action by approval authority-individual approval.
Code of Federal Regulations, 2010 CFR
2010-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.16 Action by approval authority-individual approval. (a) The...
49 CFR 451.16 - Action by approval authority-individual approval.
Code of Federal Regulations, 2014 CFR
2014-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.16 Action by approval authority-individual approval. (a) The...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-05
... 2013 that appeared in the Federal Register of April 30, 2013. FDA is correcting the approved strengths... correcting the approved strengths of dexmedetomidine hydrochloride injectable solution. This correction is...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Kauss
2011-06-01
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 539: Areas 25 and 26 Railroad Tracks, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 539 are located within Areas 25 and 26 of the Nevada National Security Site. Corrective Action Unit 539 comprises the following CASs: • 25-99-21, Area 25 Railroad Tracksmore » • 26-99-05, Area 26 Railroad Tracks The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 539 were met. To achieve this, the following actions were performed: • Reviewed documentation on historical and current site conditions, including the concentration and extent of contamination. • Conducted radiological walkover surveys of railroad tracks in both Areas 25 and 26. • Collected ballast and soil samples and calculated internal dose estimates for radiological releases. • Collected in situ thermoluminescent dosimeter measurements and calculated external dose estimates for radiological releases. • Removed lead bricks as potential source material (PSM) and collected verification samples. • Implemented corrective actions as necessary to protect human health and the environment. • Properly disposed of corrective action and investigation wastes. • Implemented an FFACO use restriction (UR) for radiological contamination at CAS 25-99-21. The approved UR form and map are provided in Appendix F and will be filed in the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), Facility Information Management System; the FFACO database; and the NNSA/NSO CAU/CAS files. From November 29, 2010, through May 2, 2011, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks, Nevada Test Site, Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels (FALs) to determine COCs for CAU 539. Assessment of the data generated from closure activities revealed the following: • At CAS 26-99-05, the total effective dose for radiological releases did not exceed the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at three locations. A corrective action of clean closure was implemented at these locations, and verification samples indicated that no further action is necessary. • At CAS 25-99-21, the total effective dose for radiological releases exceeds the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at eight locations. A corrective action was implemented by removing the lead bricks and soil above FALs at these locations, and verification samples indicated that no further action is necessary. Pieces of debris with high radioactivity were identified as PSM and remain within the CAS boundary. A corrective action of closure in place with a UR was implemented at this CAS because closure activities showed evidence of remaining soil contamination and radioactive PSM. Future land use will be restricted from surface and intrusive activities. Closure activities generated waste streams consisting of industrial solid waste, recyclable materials, low-level radioactive waste, and mixed low-level radioactive waste. Wastes were disposed of in the appropriate onsite landfills. The NNSA/NSO provides the following recommendations: • Clean closure is required at CAS 26-99-05. • Closure in place is required at CAS 25-99-21. • A UR is required at CAS 25-99-21. • A Notice of Completion to the NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 539. • Corrective Action Unit 539 should be moved from Appendix III to Appendix IV of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
C. M. Obi
2000-04-01
The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed following the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999b) and consisted of closure-in-place with partial excavation, disposal, backfilling, administrative controls, and post-closure monitoring. Soil with petroleum hydrocarbon concentrations above the Nevada Division of Environmental Protection (NDEP) Action Level of 100 milligrams per kilogram (mg/kg) (Nevada Administrative Code, 1996) was removed to a depth of 1.5 meters (m) (5 feet [ft]). The excavations were backfilled with clean fillmore » to restore the site and to prevent contact with deeper, closed-in-place soil that exceeded the NDEP Action Level. According to the Corrective Action Investigation Plan (CAIP) (DOE, 1998), the Mercury Fire Training Pit was used from approximately 1965 to the early 1990s to train fire-fighting and emergency response personnel at the NTS and encompasses an area approximately 85 by 115 m (280 by 380 ft). The location of the Mercury Fire Training Pit is shown in Figure 1 and a site plan is shown in Figure 2. The Mercury Fire Training Pit formerly included a bermed bum pit with four small bum tanks; four large above ground storage tanks (ASTS); an overturned bus, a telephone pole storage area; and several areas for burning sheds, pallets, and cables. During the active life of the Mercury Fire Training Pit, training events were conducted at least monthly and sometimes as often as weekly. Fuels burned during these events included off-specification or rust-contaminated gasoline, diesel, and aviation fuel (JP-4). Other items burned during these events included paint, tires, a pond liner, wood, paper, cloth, and copper cable. Approximately 570 liters (L) (150 gallons [gal]) of fuel were used for each training event resulting in an approximate total of 136,000 L (36,000 gal) of fuel used over the life of the Mercury Fire Training Pit. Unburned fuel was allowed to pool on the ground and was left to eventually volatilize or soak into the soil. In addition, fuels from the ASTS and fuels and fluids from the overturned bus leaked or spilled onto the ground. Approximately 19 L to 38 L (5 to 10 gal) of paint were also burned monthly until sometime in the 1970s.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-18
...EPA is taking final action to approve a request submitted on December 18, 2009, and supplemented on December 22, 2010, from the State of North Carolina, through the North Carolina Department of Environment and Natural Resources (NC DENR), Division of Air Quality (DAQ), to redesignate the Greensboro-Winston-Salem-High Point fine particulate matter (PM2.5) nonattainment area (hereafter the ``Greensboro Area'' or ``Area'') to attainment for the 1997 Annual PM2.5 National Ambient Air Quality Standards (NAAQS). The Greensboro Area is comprised of Davidson and Guilford Counties in their entireties. EPA's approval of the redesignation request is based on the determination that the State of North Carolina has met the criteria for redesignation to attainment set forth in the Clean Air Act (CAA or Act), including the determination that the Greensboro Area has attained the 1997 Annual PM2.5 NAAQS by its applicable attainment date of April 5, 2010. Additionally, EPA is approving a revision to the North Carolina State Implementation Plan (SIP) to include the 1997 Annual PM2.5 maintenance plan for the Greensboro Area that contains the new 2011 and 2021 motor vehicle emission budgets (MVEBs) for nitrogen oxides (NOX) and PM2.5 for both Davidson and Guilford Counties. This action also approves the emissions inventory submitted with the maintenance plan. Further, EPA is correcting a typographical error for the citation associated with a previous adequacy finding the Agency made for the NOX and PM2.5 MVEBs for both Davidson and Guilford Counties.
49 CFR 451.3 - Action by Approval Authority.
Code of Federal Regulations, 2013 CFR
2013-10-01
... SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of Existing Containers § 451.3 Action by Approval Authority. (a) The Approval Authority (or the Chief, Office of... affix a safety approval plate to each container after an examination of each container concerned has...
49 CFR 451.3 - Action by Approval Authority.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of Existing Containers § 451.3 Action by Approval Authority. (a) The Approval Authority (or the Chief, Office of... affix a safety approval plate to each container after an examination of each container concerned has...
49 CFR 451.3 - Action by Approval Authority.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of Existing Containers § 451.3 Action by Approval Authority. (a) The Approval Authority (or the Chief, Office of... affix a safety approval plate to each container after an examination of each container concerned has...
49 CFR 451.3 - Action by Approval Authority.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of Existing Containers § 451.3 Action by Approval Authority. (a) The Approval Authority (or the Chief, Office of... affix a safety approval plate to each container after an examination of each container concerned has...
49 CFR 451.3 - Action by Approval Authority.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of Existing Containers § 451.3 Action by Approval Authority. (a) The Approval Authority (or the Chief, Office of... affix a safety approval plate to each container after an examination of each container concerned has...
49 CFR 451.13 - Action by approval authority-approval by design type.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) COAST GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.13 Action by approval authority-approval by design type. (a) The... of safety approval plates to the containers. Absence of individual inspections will not relieve the...
49 CFR 451.13 - Action by approval authority-approval by design type.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) COAST GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.13 Action by approval authority-approval by design type. (a) The... of safety approval plates to the containers. Absence of individual inspections will not relieve the...
49 CFR 451.13 - Action by approval authority-approval by design type.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) COAST GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.13 Action by approval authority-approval by design type. (a) The... of safety approval plates to the containers. Absence of individual inspections will not relieve the...
49 CFR 451.13 - Action by approval authority-approval by design type.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) COAST GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.13 Action by approval authority-approval by design type. (a) The... of safety approval plates to the containers. Absence of individual inspections will not relieve the...
49 CFR 451.13 - Action by approval authority-approval by design type.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) COAST GUARD, DEPARTMENT OF HOMELAND SECURITY SAFETY APPROVAL OF CARGO CONTAINERS TESTING AND APPROVAL OF CONTAINERS Approval of New Containers § 451.13 Action by approval authority-approval by design type. (a) The... of safety approval plates to the containers. Absence of individual inspections will not relieve the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2009-07-31
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less
24 CFR 581.10 - Action on approved applications.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Action on approved applications. 581... URBAN DEVELOPMENT COMMUNITY FACILITIES USE OF FEDERAL REAL PROPERTY TO ASSIST THE HOMELESS § 581.10 Action on approved applications. (a) Unutilized and underutilized properties. (1) When HHS approves an...
45 CFR 12a.10 - Action on approved applications.
Code of Federal Regulations, 2011 CFR
2011-10-01
... REAL PROPERTY TO ASSIST THE HOMELESS § 12a.10 Action on approved applications. (a) Unutilized and underutilized properties. (1) When HHS approves an application, it will so notify the applicant and forward a... 45 Public Welfare 1 2011-10-01 2011-10-01 false Action on approved applications. 12a.10 Section...
45 CFR 12a.10 - Action on approved applications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REAL PROPERTY TO ASSIST THE HOMELESS § 12a.10 Action on approved applications. (a) Unutilized and underutilized properties. (1) When HHS approves an application, it will so notify the applicant and forward a... 45 Public Welfare 1 2010-10-01 2010-10-01 false Action on approved applications. 12a.10 Section...
10 CFR 1014.10 - Action on approved claims.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Action on approved claims. 1014.10 Section 1014.10 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) ADMINISTRATIVE CLAIMS UNDER FEDERAL TORT CLAIMS ACT § 1014.10 Action on approved claims. (a) Payment of any approved claim shall not be made unless the claimant...
10 CFR 1014.10 - Action on approved claims.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Action on approved claims. 1014.10 Section 1014.10 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) ADMINISTRATIVE CLAIMS UNDER FEDERAL TORT CLAIMS ACT § 1014.10 Action on approved claims. (a) Payment of any approved claim shall not be made unless the claimant...
22 CFR 304.12 - Action on approved claim.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Action on approved claim. 304.12 Section 304.12 Foreign Relations PEACE CORPS CLAIMS AGAINST GOVERNMENT UNDER FEDERAL TORT CLAIMS ACT Procedures § 304.12 Action on approved claim. (a) Payment of a claim approved under this subpart is contingent on claimant's...
22 CFR 304.12 - Action on approved claim.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 22 Foreign Relations 2 2014-04-01 2014-04-01 false Action on approved claim. 304.12 Section 304.12 Foreign Relations PEACE CORPS CLAIMS AGAINST GOVERNMENT UNDER FEDERAL TORT CLAIMS ACT Procedures § 304.12 Action on approved claim. (a) Payment of a claim approved under this subpart is contingent on claimant's...
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE /NV
This Corrective Action Decision Document has been prepared for Corrective Action Unit 340, the NTS Pesticide Release Sites, in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 340 is located at the Nevada Test Site, Nevada, and is comprised of the following Corrective Action Sites: 23-21-01, Area 23 Quonset Hut 800 Pesticide Release Ditch; 23-18-03, Area 23 Skid Huts Pesticide Storage; and 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage. The purpose of this Corrective Action Decision Document is to identify and provide a rationale for the selection of a recommended correctivemore » action alternative for each Corrective Action Site. The scope of this Corrective Action Decision Document consists of the following tasks: Develop corrective action objectives; Identify corrective action alternative screening criteria; Develop corrective action alternatives; Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and Recommend and justify a preferred corrective action alternative for each Corrective Action Site.« less
23 CFR 140.605 - Approval actions.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Approval actions. 140.605 Section 140.605 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.605 Approval actions. (a) Authorization to proceed with preliminary...
23 CFR 140.605 - Approval actions.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Approval actions. 140.605 Section 140.605 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.605 Approval actions. (a) Authorization to proceed with preliminary...
23 CFR 140.605 - Approval actions.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Approval actions. 140.605 Section 140.605 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.605 Approval actions. (a) Authorization to proceed with preliminary...
23 CFR 140.605 - Approval actions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Approval actions. 140.605 Section 140.605 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.605 Approval actions. (a) Authorization to proceed with preliminary...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-18
...EPA is taking final action to approve a request submitted on December 18, 2009, and supplemented on December 22, 2010, from the State of North Carolina, through the North Carolina Department of Environment and Natural Resources (NC DENR), Division of Air Quality (DAQ), to redesignate the Hickory-Morganton-Lenoir fine particulate matter (PM2.5) nonattainment area (hereafter the ``Hickory Area'' or ``Area'') to attainment for the 1997 Annual PM2.5 National Ambient Air Quality Standards (NAAQS). The Hickory Area is comprised of Catawba County in its entirety. EPA's approval of the redesignation request is based on the determination that the State of North Carolina has met the criteria for redesignation to attainment set forth in the Clean Air Act (CAA or Act), including the determination that the Hickory Area has attained the 1997 Annual PM2.5 NAAQS by its applicable attainment date of April 5, 2010. Additionally, EPA is approving a revision to the North Carolina State Implementation Plan (SIP) to include the 1997 Annual PM2.5 maintenance plan for the Hickory Area that contains the new motor vehicle emission budgets (MVEBs) for nitrogen oxides (NOX) for the years 2011 and 2021 for Catawba County and the mobile insignificance determination for direct PM2.5 for the Hickory Area. This action also approves the emissions inventory submitted with the maintenance plan. Further, EPA is correcting a typographical error for the citation associated with a previous adequacy determination the Agency made for the NOX MVEBs for Catawba County and the mobile source insignificance determination for direct PM2.5 for the Hickory Area.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-24
... under the Clean Air Act (CAA), EPA is taking final action to approve state implementation plan (SIP... the background for this action? II. What action is EPA taking? III. Statutory and Executive Order... proposal to approve Indiana's state board provisions. II. What action is EPA taking? For the reasons...
Closure Letter Report for Corrective Action Unit 496: Buried Rocket Site - Antelope Lake
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
A Streamlined Approach for Environmental Restoration (SAFER) Plan for investigation and closure of CAU 496, Corrective Action Site (CAS) TA-55-008-TAAL (Buried Rocket), at the Tonopah Test Range (TTR), was approved by the Nevada Department of Environmental Protection (NDEP) on July 21,2004. Approval to transfer CAS TA-55-008-TAAL from CAU 496 to CAU 4000 (No Further Action Sites) was approved by NDEP on December 21, 2005, based on the assumption that the rocket did not present any environmental concern. The approval letter included the following condition: ''NDEP understands, from the NNSA/NSO letter dated November 30,2005, that a search will be conducted formore » the rocket during the planned characterization of other sites at the Tonopah Test Range and, if found, the rocket will be removed as a housekeeping measure''. NDEP and U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office personnel located the rocket on Mid Lake during a site visit to TTR, and a request to transfer CAS TA-55-008-TAAL from CAU 4000 back to CAU 496 was approved by NDEP on September 11,2006. CAS TA-55-008-TAAL was added to the ''Federal Facility Agreement and Consent Order'' of 1996, based on an interview with a retired TTR worker in 1993. The original interview documented that a rocket was launched from Area 9 to Antelope Lake and was never recovered due to the high frequency of rocket tests being conducted during this timeframe. The interviewee recalled the rocket being an M-55 or N-55 (the M-50 ''Honest John'' rocket was used extensively at TTR from the 1960s to early 1980s). A review of previously conducted interviews with former TTR personnel indicated that the interviewees confused information from several sites. The location of the CAU 496 rocket on Mid Lake is directly south of the TTR rocket launch facility in Area 9 and is consistent with information gathered on the lost rocket during recent interviews. Most pertinently, an interview in 2005 with a former TTR range manager recalled a lost rocket that possibly contained a depleted uranium ballast in an inert warhead. The interviewee confirmed that the last tracking coordinate for the rocket indicated it was lost in an area south of Area 9 near the l T R range coordinates X = 6,614.57 feet (ft) and Y = -20,508.79 ft. These coordinates correspond to a location approximately 2,295 ft northeast of the Mid Target, on Mid Lake. CAS TA-55-008-TAAL was removed from CAU 496 before the SAFER investigation could be completed, and before the new information could be evaluated and the conceptual site model assumptions confirmed.« less
24 CFR 581.10 - Action on approved applications.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Action on approved applications... HOUSING AND URBAN DEVELOPMENT COMMUNITY FACILITIES USE OF FEDERAL REAL PROPERTY TO ASSIST THE HOMELESS § 581.10 Action on approved applications. (a) Unutilized and underutilized properties. (1) When HHS...
Sridhara, Rajeshwari; Johnson, John R; Justice, Robert; Keegan, Patricia; Chakravarty, Aloka; Pazdur, Richard
2010-02-24
The Office of Oncology Drug Products (OODP) in the Center for Drug Evaluation and Research at the US Food and Drug Administration began reviewing marketing applications for oncological and hematologic indications in July 2005. We conducted an overview of products that were reviewed by the OODP for marketing approval and the regulatory actions taken during July 2005 to December 2007. We identified all applications that were reviewed by the OODP from July 1, 2005, through December 31, 2007, and reviewed the actions that OODP took. We also sought the basis for the actions taken, including the clinical trial design, endpoints used, patient accrual in the trial(s) supporting approval, and the type of regulatory approval. During the study period, the OODP reviewed marketing applications for 60 new indications and took regulatory action on 58 indications. Regulatory action was based on a risk-benefit evaluation of the data submitted with each application. Products that demonstrated efficacy and had an acceptable risk-benefit ratio were granted either regular or accelerated marketing approval for use in the specific indication that was studied. Regular approval was based on endpoints that demonstrated that the drug provided clinical benefit as evidenced by a longer or better life or a favorable effect on an established surrogate for a longer or better life. Accelerated approval was based on a less well-established surrogate endpoint that was reasonably likely to predict a longer or better life. Of the 53 new indications that were approved during the study period, 39 received regular approval, nine received accelerated approval, and five were converted from accelerated to regular approval. Five applications were not approved, and two applications were withdrawn before any regulatory action was taken. Eighteen of the 53 indications that were approved were for new molecular entities. During the study period, regulatory action was taken on 58 of the 60 marketing applications. Fifty-three applications were approved. A variety of clinical trial endpoints were used in the approval trials.
13 CFR 120.1716 - Required SBA approval of servicing actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Required SBA approval of servicing actions. 120.1716 Section 120.1716 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS... § 120.1716 Required SBA approval of servicing actions. Seller shall not, without prior written consent...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kupar, J.; Hasek, M.
The Sanitary Landfill Corrective Action Plan proposes a two pronged approach to remediation. The first part of the total remediation strategy is the placement of a RCRA style closure cap to provide source control of contaminants into the groundwater. The second part of the proposed remediation package is a phased approach primarily using an in situ bioremediation system for groundwater clean up of the Constituents of Concern (COCs) that exceed their proposed Alternate Concentration Limits (ACL). The phased in approach of groundwater clean up will involve operation of the in situ bioremediation system, followed by evaluation of the Phase 1more » system and, if necessary, additional phased remediation strategies. This document presents pertinent information on operations, well locations, anticipated capture zones, monitoring strategies, observation wells and other information which will allow a decision on the acceptability of the remedial strategy as an interim corrective action prior to permit application approval. The proposed interim phase of the remediation program will position two horizontal bioremediation wells such that the respective zones of influence will intersect the migration path for the highest concentrations of each plume.« less
Closure Plan for Corrective Action Unit 109: U-2bu Subsidence Crater Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shannon Parsons
1999-03-01
The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facilities Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). The subsidence crater was used as a land disposal unit for radioactive and hazardous waste from 1973more » to 1988. Site disposal history is supported by memorandums, letters, and personnel who worked at the Nevada Test Site at the time of active disposal. Closure activities will include the excavation and disposal of impacted soil form the tip of the crater. Upon completion of excavation, verification samples will be collected to show that lead has been removed to concentrations be low regulatory action level. The area will then be backfilled and a soil flood diversion berm will be constructed, and certified by an independent professional engineer as to having followed the approved Closure Plan.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... taking direct final action to approve revisions to the Knox County portion of the Tennessee State... of the CAA. EPA is taking action to approve these SIP revisions. A. August 19, 2009, Submittal This... 16.3.C allowing law enforcement agencies to open burn contraband. EPA is not taking action on this...
75 FR 6813 - Approval of Air Quality Implementation Plans; New Mexico; Albuquerque/Bernalillo County
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-11
...). ACTION: Direct final rule. SUMMARY: The EPA is approving revisions to the State Implementation Plan (SIP.... Background III. Summary of Changes to the New Mexico SIP IV. Final Action V. Statutory and Executive Order Reviews I. What Action Is EPA Taking? Today we are approving revisions to the New Mexico SIP, submitted by...
DOE Office of Scientific and Technical Information (OSTI.GOV)
ITLV.
1998-06-01
This Corrective Action Decision Document has been prepared for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit 427) in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 427 is located at the Tonopah Test Range, Nevada, and is comprised of the following Corrective Action Sites, each an individual septic waste system (DOE/NV, 1996a): Septic Waste System 2 is Corrective Action Site Number 03-05-002-SW02. Septic Waste System 6 is Corrective Action Site Number 03-05-002-SW06. The purpose of this Corrective Action Decision Document is to identify and provide a rationalemore » for the selection of a recommended corrective action alternative for each Corrective Action Site. The scope of this Correction Action Decision Document consists of the following tasks: Develop corrective action objectives. Identify corrective action alternative screening criteria. Develop corrective action alternatives. Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. Recommend and justify a preferred corrective action alternative for each CAS. From November 1997 through January 1998, a corrective action investigation was performed as set forth in the Corrective Action Investigation Plan for Corrective Action Unit No. 427: Area 3 Septic Waste System Numbers 2 and 6, Tonopah Test Range, Nevada (DOE/NV, 1997b). Details can be found in Appendix A of this document. The results indicated that contamination is present in some portions of the CAU and not in others as described in Table ES-1 and shown in Figure A.2-2 of Appendix A. Based on the potential exposure pathways, the following corrective action objectives have been identified for Corrective Action Unit 427: Prevent or mitigate human exposure to subsurface soils containing TPH at concentrations greater than 100 milligrams per kilogram (NAC, 1996b). Close Septic Tank 33-5 in accordance with Nevada Administrative Code 459 (NAC, 1996c). Prevent adverse impacts to groundwater quality. Based on the review of existing data, future land use, and current operations at the Tonopah Test Range, the following alternatives were developed for consideration at the Area 3 Septic Waste Systems 2 and 6: Alternative 1 - No Further Action Alternative 2 - Closure of Septic Tank 33-5 and Administrative Controls Alternative 3 - Closure of Septic Tank 33-5, Excavation, and Disposal The corrective action alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of this evaluation, the preferred alternative for Corrective Action Unit 427 is Alternative 2, Closure of Septic Tank 33-5 and Administrative Controls. The preferred corrective action alternative was evaluated on technical merit, focusing on performance, reliability, feasibility, and safety. The alternative was judged to meet all requirements for the technical components evaluated. The alternative meets all applicable state and federal regulations for closure of the site and will reduce potential future exposure pathways to the contaminated soils. During corrective action implementation, this alternative will present minimal potential threat to site workers who come in contact with the waste. However, procedures will be developed and implemented to ensure worker health and safety.« less
Code of Federal Regulations, 2012 CFR
2012-07-01
... initiated corrective action, the corrective action(s) taken, and date on which corrective action was..., the corrective action(s) taken within the first 24 hours according to § 63.7833(g)(1) and whether they were successful, the corrective action(s) taken within the second 24 hours according to § 63.7833(g)(2...
Code of Federal Regulations, 2013 CFR
2013-07-01
... initiated corrective action, the corrective action(s) taken, and date on which corrective action was..., the corrective action(s) taken within the first 24 hours according to § 63.7833(g)(1) and whether they were successful, the corrective action(s) taken within the second 24 hours according to § 63.7833(g)(2...
Code of Federal Regulations, 2010 CFR
2010-07-01
... initiated corrective action, the corrective action(s) taken, and date on which corrective action was..., the corrective action(s) taken within the first 24 hours according to § 63.7833(g)(1) and whether they were successful, the corrective action(s) taken within the second 24 hours according to § 63.7833(g)(2...
Code of Federal Regulations, 2014 CFR
2014-07-01
... initiated corrective action, the corrective action(s) taken, and date on which corrective action was..., the corrective action(s) taken within the first 24 hours according to § 63.7833(g)(1) and whether they were successful, the corrective action(s) taken within the second 24 hours according to § 63.7833(g)(2...
Code of Federal Regulations, 2011 CFR
2011-07-01
... initiated corrective action, the corrective action(s) taken, and date on which corrective action was..., the corrective action(s) taken within the first 24 hours according to § 63.7833(g)(1) and whether they were successful, the corrective action(s) taken within the second 24 hours according to § 63.7833(g)(2...
42 CFR 460.194 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 4 2011-10-01 2011-10-01 false Corrective action. 460.194 Section 460.194 Public...) Federal/State Monitoring § 460.194 Corrective action. (a) A PACE organization must take action to correct... corrective actions. (c) Failure to correct deficiencies may result in sanctions or termination, as specified...
42 CFR 460.194 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 4 2010-10-01 2010-10-01 false Corrective action. 460.194 Section 460.194 Public...) Federal/State Monitoring § 460.194 Corrective action. (a) A PACE organization must take action to correct... corrective actions. (c) Failure to correct deficiencies may result in sanctions or termination, as specified...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-01-01
The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 536: Area 3 Release Site, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 536 consists of a single Corrective Action Site (CAS): 03-44-02, Steam Jenny Discharge. The CAU 536 site is being investigated because existing information on the nature and extent of possible contamination is insufficient to evaluate and recommend corrective action alternatives formore » CAS 03-44-02. The additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating CAAs and selecting the appropriate corrective action for this CAS. The results of this field investigation are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3-2004.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alfred Wickline
Corrective Action Unit 563, Septic Systems, is located in Areas 3 and 12 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 563 is comprised of the four corrective action sites (CASs) below: • 03-04-02, Area 3 Subdock Septic Tank • 03-59-05, Area 3 Subdock Cesspool • 12-59-01, Drilling/Welding Shop Septic Tanks • 12-60-01, Drilling/Welding Shop Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective actionmore » investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.« less
77 FR 19050 - Actions Taken at December 15, 2011, Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-29
... SUSQUEHANNA RIVER BASIN COMMISSION Actions Taken at December 15, 2011, Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: As part of its regular business meeting held on... took the following actions: (1) Rescinded approval for three water resources projects; and (2) approved...
76 FR 62142 - Actions Taken at September 15, 2011, Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-06
... SUSQUEHANNA RIVER BASIN COMMISSION Actions Taken at September 15, 2011, Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: As part of its regular business meeting held on... following actions: (1) Approved settlements involving two water resources projects; (2) approved or tabled...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-12
...This final rule approves state implementation plan (SIP) revisions submitted by the State of California on June 15, 2004 and February 3, 2009, relating to reformulated gasoline (RFG) and diesel fuel sold or supplied as motor vehicle fuels in California. The revisions relating to RFG include California Phase 3 RFG (CaRFG3) regulations, correction of errors and streamlined requirements for compliance with and enforcement of the CaRFG3 standards, and an update to the State's predictive model to mitigate permeation emissions associated with the use of ethanol as a fuel additive. The revisions relating to diesel fuel include test methods for determining the aromatic hydrocarbon content in diesel fuel and reductions in the maximum allowable sulfur content for motor vehicle diesel fuel. The effect of today's action is to make these revisions federally enforceable as part of the California SIP.
Toward Automated International Law Compliance Monitoring (TAILCM)
2014-07-01
5b. GRANT NUMBER N /A 5c. PROGRAM ELEMENT NUMBER Other (SAF) 6. AUTHOR(S) Leora Morgenstern 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT...0.7 0.8 0.9 1 Regulation Type Action Agent Patient Condition Exception Pr ec is io n Category Corrected and Uncorrected Precision for Each Category...89 .82 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 Pr ec is io n Category Precision of Each Category for Each Adjudicator A1 A2 A3 Approved for
12 CFR 907.6 - Submission requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... OPERATIONS PROCEDURES Waivers, Approvals, No-Action Letters, and Regulatory Interpretations § 907.6 Submission requirements. Applications for a Waiver or Approval and requests for a No-Action Letter or...-Action Letters. The president of the Bank making a Request for a No-Action Letter shall sign the Request...
76 FR 41855 - Actions Taken at June 23, 2011, Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
... SUSQUEHANNA RIVER BASIN COMMISSION Actions Taken at June 23, 2011, Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: As part of its regular business meeting held on June 23... actions: (1) Approved settlement involving one water resources project; (2) approved and tabled the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
David A. Strand
The Corrective Action Investigation Plan for Corrective Action Unit 219, Septic Systems and Injection Wells, has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective actions. Corrective Action Unit 219 is located in Areas 3, 16, and 23 of the Nevada Test Site, which is 65 miles northwest ofmore » Las Vegas, Nevada. Corrective Action Unit 219 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.« less
7 CFR 275.16 - Corrective action planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 4 2010-01-01 2010-01-01 false Corrective action planning. 275.16 Section 275.16... Corrective action planning. (a) Corrective action planning is the process by which State agencies shall...)/management unit(s) in the planning, development, and implementation of corrective action are those which: (1...
NASA Astrophysics Data System (ADS)
Sutrisno, Agung; Gunawan, Indra; Vanany, Iwan
2017-11-01
In spite of being integral part in risk - based quality improvement effort, studies improving quality of selection of corrective action priority using FMEA technique are still limited in literature. If any, none is considering robustness and risk in selecting competing improvement initiatives. This study proposed a theoretical model to select risk - based competing corrective action by considering robustness and risk of competing corrective actions. We incorporated the principle of robust design in counting the preference score among corrective action candidates. Along with considering cost and benefit of competing corrective actions, we also incorporate the risk and robustness of corrective actions. An example is provided to represent the applicability of the proposed model.
Sen. Baucus, Max [D-MT
2012-06-21
Senate - 09/20/2012 By Senator Baucus from Committee on Finance filed written report. Report No. 112-225. Additional views filed. (All Actions) Notes: For further action, see H.R.5986, which became Public Law 112-163 on 8/10/2012. Tracker: This bill has the status Passed SenateHere are the steps for Status of Legislation:
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
Memo: Request for Approval of a Time-Critical Removal Action and $2 Million
The purpose of this Action Memorandum is to request and document approval of a time-critical removal action described herein for the Mississippi Phosphates Corporation Site (Site) located at 601 Industrial Road, Pascagoula, Jackson County, Mississippi.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2013-09-01
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that nomore » further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.« less
76 FR 1492 - Notice of Actions Taken at December 16, 2010, Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-10
..., at which took the following actions: (1) Approved settlements involving two water resources projects; (2) approved and tabled certain water resources projects; and (3) rescinded approval for one water resources project. DATES: December 16, 2010. ADDRESSES: Susquehanna River Basin Commission, 1721 N. Front...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-04-01
This Closure Report summarizes the corrective actions which were completed at the Corrective Action Sites within Corrective Action Unit 211 Area 15 Farm Waste Sties at the Nevada Test Site. Current site descriptions, observations and identification of wastes removed are included on FFACO Corrective Action Site housekeeping closure verification forms.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The purpose of this CR is to document that the closure of CAU 5 complied with the NDEP-approved CAP closure requirements (NNSA/NSO, 2004). The closure activities specified in the CAP were based on the recommendations presented in the corrective action decision document (CADD) (NNSA/NSO, 2003). ROTC 1: The UR form was updated to the current format to include a. more detailed description of the UR and maintenance requirements. Information was edited due to the change of UR signs at the site to UR monuments/signs. The maintenance frequency was changed to annually because sign damage due to high winds was evidencedmore » during recent site inspections. The coordinates for the UR were originally based on NAD 27 and were modified to NAD 83 to comply with the most recent M&O database requirements. The modifications identified in this ROTC will supersede the existing posting requirements for the UR at CASs 06-1S-02 and 06-15-03 as identified in the CAU 5 CADD; CAU 5 CR; and the UR form associated with CASs 06-15-02 and 06-15-03.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
none
1998-03-01
This Corrective Action Decision Document (CADD) has been prepared for the Area 9 Unexploded Ordnance (UXO) Landfill (Corrective Action Unit [CAU] 453) in accordance with the Federal Facility Agreement and Consent Order (FFACO) of 1996. Corrective Action Unit 453 is located at the Tonopah Test Range (TTR), Nevada, and is comprised of three individual landfill cells located northwest of Area 9. The cells are listed as one Corrective Action Site (CAS) 09-55-001-0952. The landfill cells have been designated as: � Cell A9-1 � Cell A9-2 � Cell A9-3 The purpose of this CADD is to identify and provide a rationalemore » for the selection of a recommended corrective action alternative for CAU 453. The scope of this CADD consists of the following tasks: � Develop corrective action objectives. � Identify corrective action alternative screening criteria. � Develop corrective action alternatives. � Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. � Recommend and justify a preferred corrective action alternative for the CAU. In June and July 1997, a corrective action investigation was performed that consisted of activities set forth in the Corrective Action Investigation Plan (CAIP) (DOE/NV, 1997). Subsurface investigation of the soils surrounding the cells revealed no contaminants of concern (COCs) above preliminary action levels. The cell contents were not investigated due to the potential for live UXO. Details concerning the analytical and investigation results can be found in Appendix A of this CADD. Based on the potential exposure pathways, the following corrective action objectives have been identified for CAU 453: � Prevent or mitigate human exposure to subsurface soils containing COCs, solid waste, and/or UXO. � Prevent adverse impacts to groundwater quality. Based on the review of existing data, future land use, and current operations at the TTR, the following alternatives have been developed for consideration at the Area 9 UXO Landfill CAU: � Alternative 1 - No Further Action � Alternative 2 - Closure in Place by Administrative Controls � Alternative 3 - Closure in Place by Capping � Alternative 4 - Clean Closure by Removal The corrective action alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of this evaluation, Alternative 2, Closure in Place by Administrative Controls, was selected as the preferred corrective action alternative. The preferred corrective action alternative was evaluated on its technical merits, focusing on performance, reliability, feasibility, and safety. The alternative was judged to meet all requirements for the technical components evaluated and to represent the most cost-effective corrective action. The alternative meets all applicable state and federal regulations for closure of the site and will reduce potential future exposure pathways to the contents of the landfill. During corrective action implementation, this alternative will present minimal potential threat to site workers. However, appropriate health and safety procedures will be developed and implemented.« less
45 CFR 1225.19 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false Corrective action. 1225.19 Section 1225.19 Public... Corrective action. (a) When discrimination is found, Peace Corps or ACTION must take appropriate action to... corrective action to the agent and other class members in accordance with § 1225.10 of this part. (b) When...
45 CFR 1225.19 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Corrective action. 1225.19 Section 1225.19 Public... Corrective action. (a) When discrimination is found, Peace Corps or ACTION must take appropriate action to... corrective action to the agent and other class members in accordance with § 1225.10 of this part. (b) When...
41 CFR 102-75.1205 - What action must be taken on approved applications?
Code of Federal Regulations, 2010 CFR
2010-07-01
... taken on approved applications? 102-75.1205 Section 102-75.1205 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 75-REAL PROPERTY DISPOSAL Use of Federal Real Property to Assist the Homeless Action on Approved...
41 CFR 102-75.1205 - What action must be taken on approved applications?
Code of Federal Regulations, 2011 CFR
2011-01-01
... taken on approved applications? 102-75.1205 Section 102-75.1205 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 75-REAL PROPERTY DISPOSAL Use of Federal Real Property to Assist the Homeless Action on Approved...
DOE Office of Scientific and Technical Information (OSTI.GOV)
David A. Strand
2005-05-01
This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 224, Decon Pad and Septic Systems, in Areas 2, 3, 5, 6, 11, and 23 of the Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 224 is comprised of the following corrective action sites (CASs): (1) 02-04-01, Septic Tank (Buried); (2) 03-05-01, Leachfield; (3) 05-04-01, Septic Tanks (4)/Discharge Area; (4) 06-03-01, Sewage Lagoons (3); (5) 06-05-01, Leachfield; (6) 06-17-04, Decon Pad and Wastewater Catch; (7) 06-23-01, Decon Pad Discharge Piping; (8) 11-04-01, Sewage Lagoon; and (9) 23-05-02,more » Leachfield. The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a corrective action alternative for the nine CASs within CAU 224. Corrective action investigation activities were performed from August 10, 2004, through January 18, 2005, as set forth in the CAU 224 Corrective Action Investigation Plan.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... RECOVERY ACCOUNTABILITY AND TRANSPARENCY BOARD Agency Information Collection Activities: Renewal of Currently Approved Collection; Comment Request Correction In notice document 2012-30952, appearing on page 76097, in the issue of Wednesday, December 26, 2012, make the following correction: In the...
9 CFR 416.15 - Corrective Actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Corrective Actions. 416.15 Section 416... SANITATION § 416.15 Corrective Actions. (a) Each official establishment shall take appropriate corrective action(s) when either the establishment or FSIS determines that the establishment's Sanitation SOP's or...
42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 4 2010-10-01 2010-10-01 false Procedures for CMS action on assurances and State... for Inpatient Hospital and Long-Term Care Facility Services Payment Rates § 447.256 Procedures for CMS action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action on...
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
2004-04-01
This Corrective Action Decision Document identifies the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's corrective action alternative recommendation for each of the corrective action sites (CASs) within Corrective Action Unit (CAU) 204: Storage Bunkers, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. An evaluation of analytical data from the corrective action investigation, review of current and future operations at each CAS, and a detailed comparative analysis of potential corrective action alternatives were used to determine the appropriate corrective action for each CAS. There are six CASs in CAU 204, which aremore » all located between Areas 1, 2, 3, and 5 on the NTS. The No Further Action alternative was recommended for CASs 01-34-01, 02-34-01, 03-34-01, and 05-99-02; and a Closure in Place with Administrative Controls recommendation was the preferred corrective action for CASs 05-18-02 and 05-33-01. These alternatives were judged to meet all requirements for the technical components evaluated as well as applicable state and federal regulations for closure of the sites and will eliminate potential future exposure pathways to the contaminated media at CAU 204.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-12-01
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 567: Miscellaneous Soil Sites, Nevada National Security Site, Nevada. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 567 based on the implementation of the corrective actions. The corrective actions implemented at CAU 567 were developed based on an evaluation of analytical data from the CAI, the assumed presence of COCs at specific locations, and the detailed and comparative analysis of the CAAs. The CAAs weremore » selected on technical merit focusing on performance, reliability, feasibility, safety, and cost. The implemented corrective actions meet all requirements for the technical components evaluated. The CAAs meet all applicable federal and state regulations for closure of the site. Based on the implementation of these corrective actions, the DOE, National Nuclear Security Administration Nevada Field Office provides the following recommendations: • No further corrective actions are necessary for CAU 567. • The Nevada Division of Environmental Protection issue a Notice of Completion to the DOE, National Nuclear Security Administration Nevada Field Office for closure of CAU 567. • CAU 567 be moved from Appendix III to Appendix IV of the FFACO.« less
MO-G-BRE-08: Taxonomy of Corrective Actions in Radiotherapy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sutlief, S; Brown, D
2014-06-15
Purpose: Various causal taxonomies have been developed for healthcare incidents and for radiation therapy in particular. The causal analysis of incidents leads to corrective actions which can also be organized into a taxonomy. Such a corrective action classification system would provide information about the situational context, the action type, and the leverage of the action in order to detect patterns in the corrective actions frequently employed in radiation therapy. It would also provide practical guidance to the radiation therapy community for determining the appropriateness and potential effectiveness of proposed corrective actions. Materials: A review of causal analysis reports and correctivemore » action plans was conducted using the following sources: US NRC medical event reports, IAEA reports, ROSIS submissions, US Veterans Health Administration reports, and singleincident report sources. The corrective actions presented in the published sources were then mapped onto four corrective action taxonomy prototypes: role-based, safety-context-based, responsibility-based, and hierarchy of hazard control. The resulting corrective action taxonomy was then validated through use of the published sources. Results: The responsibility-based taxonomy and hierarchy of hazard taxonomy provided more intuitive and sensible categories than the role-based taxonomy or the safety-context taxonomy. The most frequent corrective actions were added safety barriers, training, process standardization, and development of a quality improvement program where one was lacking. Conclusion: Published corrective action statements in radiation therapy emphasize what to do more so than whom the recipient is or which process step is affected. The hierarchy of hazard taxonomy provides a suitable framework for radiation therapy and has the advantage of providing insight into the likelihood that a particular corrective action will mitigate the recurrence of the error it was meant to correct. This information would be useful to medical center administration, safety personnel, and regulators who must assess the projected efficacy of corrective actions. Derek Brown is a director of TreatSafely, LLC.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark McLane
2005-03-01
This Corrective Action Decision Document (CADD) was prepared by the Defense Threat Reduction Agency (DTRA) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The recommendations and corrective actions described within this document apply to the future closure of Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is a joint DTRA and NNSA/NSO site. The CAU consists of three (3) Corrective Action Sites (CASs): CAS 12-06-06 (Muckpile); CAS 12-25-02 (Oil Spill); and CAS 12-28-02 (Radioactive Material). In addition to these CASs, E-Tunnel Ponds One, Two, and Three, and the Drainage Area above themore » ponds were included since closure of the Muckpile will impact these areas. This CADD is consistent with the requirements of the ''Federal Facility Agreement and Consent Order'' agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The DTRA point of contact is the Nevada Operations Office, Environmental Project Manager; currently Ms. Tiffany A. Lantow. The NNSA/NSO point of contact is the Environmental Restoration, Industrial Sites Project Manager; currently Ms. Janet Appenzeller-Wing. The purpose of this CADD is to identify and provide the rationale for the selection of a recommended corrective action alternative for CAU 383. This document presents the recommended corrective action for CAU 383 (E-Tunnel Sites); however, implementation may be affected by the corrective action (to be determined) for CAU 551 (Area 12 Muckpiles) due to the close proximity of B, C, D, and F-Tunnels. The scope of this CADD consists of the following tasks: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend and justify a preferred corrective action alternative for CAU 383.« less
1991-07-05
This final rule amends the portions of the Medicaid regulations under which an intermediate care facility for the mentally retarded (ICF/MR) with substantial deficiencies that did not pose an immediate jeopardy to the health and safety of clients could continue participation in the Medicaid program. These regulations gave State Medicaid agencies the option of submitting written plans to either correct deficiencies or permanently reduce the number of beds in the certified portion of the facility. This rule removes all requirements for submitting, approving, and monitoring correction plans for ICFs/MR. The requirements for submitting and approving correction plans are being removed because the time limit for submission of these plans has passed. The provisions for monitoring correction plans are being removed because there are no remaining facilities for which these provisions apply. This final rule also removes requirements for submitting and approving reduction plans for ICFs/MR because the time limit for submitting these plans has passed. It retains and updates the requirements for monitoring and compliance that apply to those ICFs/MR for which reduction plans were approved by January 1, 1990.
40 CFR 52.2126 - VOC rule deficiency correction.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) South Carolina § 52.2126 VOC rule deficiency correction. Sections I and II of South Carolina's Regulations 62.1 and 62.5 is approved. The State... Toxics Management Division, to Mr. Otto E. Pearson, former Director of the South Carolina Department of...
76 FR 16365 - Approval and Promulgation of Implementation Plans; Washington: Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-23
... precursors to a NAAQS pollutant: Department of Ecology (Ecology): WAC 173-400-040 (except WAC 173- 400-040(1..., Ecology and SWCAA stated their support of EPA's approval of this correction and narrowing of the... address, as appropriate, disproportionate human health or environmental effects, using practicable and...
75 FR 5514 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-03
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2009-0771; FRL-9108-7] Approval and Promulgation of Air Quality Implementation Plans; Indiana; Correction AGENCY: Environmental Protection Agency..., Environmental Engineer, Criteria Pollutant Section, Air Programs Branch (AR-18J), Environmental Protection...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Farnham, Irene
This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, Nevada National Security Site (NNSS), Nevada. The Yucca Flat/Climax Mine CAU is located in the northeastern portion of the NNSS and comprises 720 corrective action sites. A total of 747 underground nuclear detonations took place within this CAU between 1957 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities. The CADD portion describes the Yucca Flat/Climax Mine CAU data-collection and modeling activities completed during the corrective action investigationmore » (CAI) stage, presents the corrective action objectives, and describes the actions recommended to meet the objectives. The CAP portion describes the corrective action implementation plan. The CAP presents CAU regulatory boundary objectives and initial use-restriction boundaries identified and negotiated by DOE and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the groundwater flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The UGTA strategy assumes that active remediation of subsurface RN contamination is not feasible with current technology. As a result, the corrective action is based on a combination of characterization and modeling studies, monitoring, and institutional controls. The strategy is implemented through a four-stage approach that comprises the following: (1) corrective action investigation plan (CAIP), (2) CAI, (3) CADD/CAP, and (4) closure report (CR) stages.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Findlay, Rick
The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, southmore » of Highway 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tim Echelard
The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, south of Highwaymore » 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.« less
21 CFR 120.10 - Corrective actions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Corrective actions. 120.10 Section 120.10 Food and... actions. Whenever a deviation from a critical limit occurs, a processor shall take corrective action by... develop written corrective action plans, which become part of their HACCP plans in accordance with § 120.8...
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE /NV
This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 252: Area 25 Engine Test Stand-1 Decontamination Pad, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Located at the Nevada Test Site in Nevada, CAU 252 consists of only one Corrective Action Site (25-07-04, Decontamination Pad). This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary at CAU 252. The Corrective Action Decision Document and Closure Report have been combined into one report because the potential contaminants of concern weremore » either not detected during the corrective action investigation or were only present at naturally occurring concentrations. Based on the field results, neither corrective action or a corrective action plan is required at this site. A Notice of Completion to DOE/NV is being requested from the Nevada Division of Environmental Protection for closure of CAU 252, as well as a request that this site be moved from Appendix III to Appendix IV of the FFACO. Further, no use restrictions are required to be placed on this CAU.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-11
... for OMB Review; Comment Request; Agreement Approval Process for Use of Functional Affirmative Action..., ``Agreement Approval Process for Use of Functional Affirmative Action Programs,'' to the Office of Management... 11246 permit Federal supply and service contractors to develop affirmative action programs (AAPs) that...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2008-05-01
Corrective Action Unit (CAU) 560 is located in Areas 3 and 6 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 560 is comprised of the seven corrective action sites (CASs) listed below: • 03-51-01, Leach Pit • 06-04-02, Septic Tank • 06-05-03, Leach Pit • 06-05-04, Leach Bed • 06-59-03, Building CP-400 Septic System • 06-59-04, Office Trailer Complex Sewage Pond • 06-59-05, Control Point Septic System These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend correctivemore » action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 22, 2008, by representatives from the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 560.« less
The functional therapeutic chemical classification system.
Croset, Samuel; Overington, John P; Rebholz-Schuhmann, Dietrich
2014-03-15
Drug repositioning is the discovery of new indications for compounds that have already been approved and used in a clinical setting. Recently, some computational approaches have been suggested to unveil new opportunities in a systematic fashion, by taking into consideration gene expression signatures or chemical features for instance. We present here a novel method based on knowledge integration using semantic technologies, to capture the functional role of approved chemical compounds. In order to computationally generate repositioning hypotheses, we used the Web Ontology Language to formally define the semantics of over 20 000 terms with axioms to correctly denote various modes of action (MoA). Based on an integration of public data, we have automatically assigned over a thousand of approved drugs into these MoA categories. The resulting new resource is called the Functional Therapeutic Chemical Classification System and was further evaluated against the content of the traditional Anatomical Therapeutic Chemical Classification System. We illustrate how the new classification can be used to generate drug repurposing hypotheses, using Alzheimers disease as a use-case. https://www.ebi.ac.uk/chembl/ftc; https://github.com/loopasam/ftc. croset@ebi.ac.uk Supplementary data are available at Bioinformatics online.
76 FR 41111 - Approval and Promulgation of Implementation Plans; South Carolina; 110(a)(1) and (2...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-13
...EPA is taking final action to approve the December 13, 2007, submission submitted by the State of South Carolina, through the South Carolina Department of Health and Environmental Control (SC DHEC) as demonstrating that the State meets the state implementation plan (SIP) requirements of sections 110(a)(1) and (2) of the Clean Air Act (CAA or the Act) for the 1997 8-hour ozone national ambient air quality standards (NAAQS). Section 110(a) of the CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by the EPA, which is commonly referred to as an ``infrastructure'' SIP. South Carolina certified that the South Carolina SIP contains provisions that ensure the 1997 8-hour ozone NAAQS is implemented, enforced, and maintained in South Carolina (hereafter referred to as ``infrastructure submission''). South Carolina's infrastructure submission, provided to EPA on December 13, 2007, addressed all the required infrastructure elements for the 1997 8-hour ozone NAAQS. Additionally, EPA is correcting an inadvertent error and responding to adverse comments received on EPA's March 17, 2011, proposed approval of South Carolina's December 13, 2007, infrastructure submission.
10 CFR 71.133 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Corrective action. 71.133 Section 71.133 Energy NUCLEAR....133 Corrective action. The licensee, certificate holder, and applicant for a CoC shall establish... determined and corrective action taken to preclude repetition. The identification of the significant...
10 CFR 71.133 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Corrective action. 71.133 Section 71.133 Energy NUCLEAR....133 Corrective action. The licensee, certificate holder, and applicant for a CoC shall establish... determined and corrective action taken to preclude repetition. The identification of the significant...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada. CAU 573 comprises the two corrective action sites (CASs): 05-23-02-GMX Alpha Contaminated Are-Closure in Place and 05-45-01-Atmospheric Test Site - Hamilton- Clean Closure. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 573 based on the implementation of the corrective actions. Corrective action activities were performed at Hamilton from May 25 through June 30, 2016; and at GMX from May 25 to Octobermore » 27, 2016, as set forth in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit 573: Alpha Contaminated Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. Verification sample results were evaluated against data quality objective criteria developed by stakeholders that included representatives from the Nevada Division of Environmental Protection and the DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) during the corrective action alternative (CAA) meeting held on November 24, 2015. Radiological doses exceeding the final action level were assumed to be present within the high contamination areas associated with CAS 05-23-02, thus requiring corrective action. It was also assumed that radionuclides were present at levels that require corrective action within the soil/debris pile associated with CAS 05-45-01. During the CAU 573 CAA meeting, the CAA of closure in place with a use restriction (UR) was selected by the stakeholders as the preferred corrective action of the high contamination areas at CAS 05-23-02 (GMX), which contain high levels of removable contamination; and the CAA of clean closure was selected by the stakeholders as preferred corrective action for the debris pile at CAS 05-45-01 (Hamilton). The closure in place was accomplished by posting signs containing a warning label on the existing contamination area fence line; and recording the FFACO UR and administrative UR in the FFACO database, the NNSA/NFO CAU/CAS files, and the management and operating contractor Geographic Information Systems. The clean closure was accomplished by excavating the soil/debris pile, disposing of the contents at the Area 5 Radioactive Waste Management Complex, and collecting verification samples. The corrective actions were implemented as stipulated in the CADD/CAP, and verification sample results confirm that the criteria for the completion of corrective actions have been met. Based on the implementation of these corrective actions, NNSA/NFO provides the following recommendations: No further corrective actions are necessary for CAU 573; The Nevada Division of Environmental Protection should issue a Notice of Completion to NNSA/NFO for closure of CAU 573; CAU 573 should be moved from Appendix III to Appendix IV of the FFACO.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-21
... DEPARTMENT OF JUSTICE Agency Information Collection Activities; Revision of a Previously Approved Collection, With Change; Comments Requested: COPS Progress Report Correction In notice document 2013-25701, appearing on page 64979 in the issue of Wednesday, October 30, 2013, make the following correction: On page 64979, in the second column,...
28 CFR 115.404 - Audit corrective action plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...
28 CFR 115.404 - Audit corrective action plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...
28 CFR 115.404 - Audit corrective action plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...
40 CFR 35.3170 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Corrective action. 35.3170 Section 35... STATE AND LOCAL ASSISTANCE State Water Pollution Control Revolving Funds § 35.3170 Corrective action. (a... will notify the State of such noncompliance and prescribe the necessary corrective action. Failure to...
42 CFR 431.246 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 4 2011-10-01 2011-10-01 false Corrective action. 431.246 Section 431.246 Public... Recipients Procedures § 431.246 Corrective action. The agency must promptly make corrective payments, retroactive to the date an incorrect action was taken, and, if appropriate, provide for admission or...
16 CFR 1209.37 - Corrective actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Corrective actions. 1209.37 Section 1209.37... SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.37 Corrective actions. (a) Test failure. When any test required by § 1209.36 yields failing or unacceptable results, corrective action must be...
42 CFR 431.246 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 4 2010-10-01 2010-10-01 false Corrective action. 431.246 Section 431.246 Public... Recipients Procedures § 431.246 Corrective action. The agency must promptly make corrective payments, retroactive to the date an incorrect action was taken, and, if appropriate, provide for admission or...
40 CFR 35.3170 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Corrective action. 35.3170 Section 35... STATE AND LOCAL ASSISTANCE State Water Pollution Control Revolving Funds § 35.3170 Corrective action. (a... will notify the State of such noncompliance and prescribe the necessary corrective action. Failure to...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
Corrective Action Unit 374 is located in Areas 18 and 20 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 374 comprises the five corrective action sites (CASs) listed below: • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAsmore » and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on October 20, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 374.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kidman, Raymond; Matthews, Patrick
The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 541 based on the no further action alternative listed in Table ES-1.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 477, N-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 477 is comprised of one Corrective Action Site (CAS): • 12-06-03, Muckpile The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure with no further action, by placing use restrictions on CAUmore » 477.« less
40 CFR 257.28 - Implementation of the corrective action program.
Code of Federal Regulations, 2014 CFR
2014-07-01
...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...
40 CFR 257.28 - Implementation of the corrective action program.
Code of Federal Regulations, 2013 CFR
2013-07-01
...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...
40 CFR 257.28 - Implementation of the corrective action program.
Code of Federal Regulations, 2011 CFR
2011-07-01
...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...
40 CFR 192.04 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Corrective action. 192.04 Section 192... Corrective action. If the groundwater concentration limits established for disposal sites under provisions of § 192.02(c) are found or projected to be exceeded, a corrective action program shall be placed into...
21 CFR 123.7 - Corrective actions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Corrective actions. 123.7 Section 123.7 Food and... CONSUMPTION FISH AND FISHERY PRODUCTS General Provisions § 123.7 Corrective actions. (a) Whenever a deviation from a critical limit occurs, a processor shall take corrective action either by: (1) Following a...
10 CFR 72.172 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Corrective action. 72.172 Section 72.172 Energy NUCLEAR... Corrective action. The licensee, applicant for a license, certificate holder, and applicant for a CoC shall... that the cause of the condition is determined and corrective action is taken to preclude repetition...
45 CFR 1225.10 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false Corrective action. 1225.10 Section 1225.10 Public... Corrective action. When it has been determined by Final Agency Decision that the aggrieved party has been subjected to illegal discrimination, the following corrective actions may be taken: (a) Selection as a...
9 CFR 417.3 - Corrective actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Corrective actions. 417.3 Section 417... ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS § 417.3 Corrective actions. (a) The written HACCP plan shall identify the corrective action to be followed in response to a deviation from a critical limit...
34 CFR 200.42 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 1 2011-07-01 2011-07-01 false Corrective action. 200.42 Section 200.42 Education... Programs Operated by Local Educational Agencies Lea and School Improvement § 200.42 Corrective action. (a) Definition. “Corrective action” means action by an LEA that— (1) Substantially and directly responds to— (i...
10 CFR 72.172 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Corrective action. 72.172 Section 72.172 Energy NUCLEAR... Corrective action. The licensee, applicant for a license, certificate holder, and applicant for a CoC shall... that the cause of the condition is determined and corrective action is taken to preclude repetition...
34 CFR 200.42 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 1 2010-07-01 2010-07-01 false Corrective action. 200.42 Section 200.42 Education... Programs Operated by Local Educational Agencies Lea and School Improvement § 200.42 Corrective action. (a) Definition. “Corrective action” means action by an LEA that— (1) Substantially and directly responds to— (i...
45 CFR 1225.10 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Corrective action. 1225.10 Section 1225.10 Public... Corrective action. When it has been determined by Final Agency Decision that the aggrieved party has been subjected to illegal discrimination, the following corrective actions may be taken: (a) Selection as a...
40 CFR 192.04 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Corrective action. 192.04 Section 192... Corrective action. If the groundwater concentration limits established for disposal sites under provisions of § 192.02(c) are found or projected to be exceeded, a corrective action program shall be placed into...
42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.
Code of Federal Regulations, 2011 CFR
2011-10-01
... plan amendments. 447.256 Section 447.256 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES... action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action on State plans and State plan amendments, is taken in accordance with subpart B of part 430 of this chapter...
42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.
Code of Federal Regulations, 2013 CFR
2013-10-01
... plan amendments. 447.256 Section 447.256 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES... action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action on State plans and State plan amendments, is taken in accordance with subpart B of part 430 of this chapter...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-10
... that an affirmative defense is not available in an enforcement action in Federal court to enforce the... for sources covered by those provisions: A source may assert an affirmative defense in an action..., shutdown or malfunction. Thus, the action we are finalizing in this rulemaking-- approving an affirmative...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of corrective action alternatives (CAAs) for the 14 CASs within CAU 568. Corrective action investigation (CAI) activities were performed from April 2014 through May 2015, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites, Nevada National Security Site, Nevada; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. The purpose of the CAI was to fulfill data needs as defined during themore » DQO process. The CAU 568 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated that the dataset is complete and acceptable for use in fulfilling the DQO data needs. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 14 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 568: • No further action is the preferred corrective action for CASs 03-23-17, 03-23-22, 03-23-26. • Closure in place is the preferred corrective action for CAS 03-23-19; 03-45-01; the SE DCBs at CASs 03-23-20, 03-23-23, 03-23-31, 03-23-32, 03-23-33, and 03-23-34; and the Pascal-BHCA at CAS 03-23-31. • Clean closure is the preferred corrective action for CASs 03-08-04, 03-23-30, and 03-26-04; and the four well head covers at CASs 03-23-20, 03-23-23, 03-23-31, and 03-23-33.« less
27 CFR 25.273 - Action on application.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., DEPARTMENT OF THE TREASURY LIQUORS BEER Pilot Brewing Plants § 25.273 Action on application. If the appropriate TTB officer approves the application for a pilot brewing plant, he or she will note approval on...
27 CFR 25.273 - Action on application.
Code of Federal Regulations, 2011 CFR
2011-04-01
..., DEPARTMENT OF THE TREASURY LIQUORS BEER Pilot Brewing Plants § 25.273 Action on application. If the appropriate TTB officer approves the application for a pilot brewing plant, he or she will note approval on...
23 CFR 470.115 - Approval authority.
Code of Federal Regulations, 2010 CFR
2010-04-01
... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH HIGHWAY SYSTEMS Federal... Federal-aid highway system actions involving the designation, or revision, of routes on the Interstate...) The Federal Highway Administrator will approve functional classification actions. ...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-09
..., contingency measures, and other planning SIPs related to the attainment of either the 1997 annual or 2006 24... contingency measures, with a schedule for implementation, as EPA deems necessary to assure prompt correction... continued attainment; and (5) a contingency plan to prevent or correct future violations of the NAAQS. III...
5 CFR 930.113 - Corrective action.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Corrective action. 930.113 Section 930....113 Corrective action. An agency will take adverse, disciplinary, or other appropriate action against... such action against an operator or an incidental operator: (a) The employee is convicted of operating...
5 CFR 930.113 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Corrective action. 930.113 Section 930....113 Corrective action. An agency will take adverse, disciplinary, or other appropriate action against... such action against an operator or an incidental operator: (a) The employee is convicted of operating...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sloop, Christy
2013-04-01
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 569: Area 3 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 569 comprises the following nine corrective action sites (CASs): • 03-23-09, T-3 Contamination Area • 03-23-10, T-3A Contamination Area • 03-23-11, T-3B Contamination Area • 03-23-12, T-3S Contamination Area • 03-23-13, T-3T Contamination Area • 03-23-14, T-3V Contamination Area • 03-23-15, S-3G Contamination Area • 03-23-16, S-3H Contamination Area • 03-23-21, Pike Contamination Area The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supportingmore » the recommendation that no further corrective action is needed for CAU 569 based on the implementation of the corrective actions listed in Table ES-2.« less
Method and system for providing work machine multi-functional user interface
Hoff, Brian D [Peoria, IL; Akasam, Sivaprasad [Peoria, IL; Baker, Thomas M [Peoria, IL
2007-07-10
A method is performed to provide a multi-functional user interface on a work machine for displaying suggested corrective action. The process includes receiving status information associated with the work machine and analyzing the status information to determine an abnormal condition. The process also includes displaying a warning message on the display device indicating the abnormal condition and determining one or more corrective actions to handle the abnormal condition. Further, the process includes determining an appropriate corrective action among the one or more corrective actions and displaying a recommendation message on the display device reflecting the appropriate corrective action. The process may also include displaying a list including the remaining one or more corrective actions on the display device to provide alternative actions to an operator.
48 CFR 750.7105 - Approving authorities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Approving authorities. 750.7105 Section 750.7105 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Extraordinary Contractual Actions To Protect Foreign...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2006-04-01
Corrective Action Unit (CAU) 139 is located in Areas 3, 4, 6, and 9 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 139 is comprised of the seven corrective action sites (CASs) listed below: (1) 03-35-01, Burn Pit; (2) 04-08-02, Waste Disposal Site; (3) 04-99-01, Contaminated Surface Debris; (4) 06-19-02, Waste Disposal Site/Burn Pit; (5) 06-19-03, Waste Disposal Trenches; (6) 09-23-01, Area 9 Gravel Gertie; and (7) 09-34-01, Underground Detection Station. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluatemore » and recommend corrective action alternatives with the exception of CASs 09-23-01 and 09-34-01. Regarding these two CASs, CAS 09-23-01 is a gravel gertie where a zero-yield test was conducted with all contamination confined to below ground within the area of the structure, and CAS 09-34-01 is an underground detection station where no contaminants are present. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for the other five CASs where information is insufficient. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 4, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 139.« less
Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents ofmore » concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 371, Johnnie Boy Crater and Pin Stripe, located within Areas 11 and 18 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit (CAU) 371 comprises two corrective action sites (CASs): • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 371 based on the implementation of correctivemore » actions. The corrective action of closure in place with administrative controls was implemented at both CASs. Corrective action investigation (CAI) activities were performed from January 8, 2009, through February 16, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 371 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface soil. However, it was assumed that radionuclides are present in subsurface media within the Johnnie Boy crater and the fissure at Pin Stripe. Due to the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consist of implementing a use restriction and posting warning signs at each site. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 371. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 371. • Corrective Action Unit 371 should be moved from Appendix III to Appendix IV of the FFACO.« less
Code of Federal Regulations, 2013 CFR
2013-04-01
... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...
Code of Federal Regulations, 2011 CFR
2011-04-01
... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...
Code of Federal Regulations, 2012 CFR
2012-04-01
... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...
Code of Federal Regulations, 2010 CFR
2010-04-01
... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...
Code of Federal Regulations, 2014 CFR
2014-04-01
... the FHAP; Corrective and remedial action for failing to comply with requirements. 115.307 Section 115... § 115.307 Requirements for participation in the FHAP; Corrective and remedial action for failing to... to the requirements of § 115.311. (b) Corrective and remedial action for failing to comply with...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-08-01
The purpose of this CADD/CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 571 based on the implementation of corrective actions. This includes a description of investigation activities, an evaluation of the data, and a description of corrective actions that were performed. The CAIP provides information relating to the scope and planning of the investigation. Therefore, that information will not be repeated in this document.
45 CFR 305.66 - Notice, corrective action year, and imposition of penalty.
Code of Federal Regulations, 2010 CFR
2010-10-01
... deficiency or deficiencies cited in the notice during the automatic corrective action year (i.e., the... corrected the deficiency or deficiencies cited in the notice by the end of the corrective action year. (d... which the penalty is assessed and which failed to correct the deficiency or deficiencies cited in the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-09-01
Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 365 based on the implementation of the corrective action of closure in place with a use restriction (UR). Corrective action investigation (CAI) activities were performed from January 18, 2011, through August 2, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area. The purpose of the CAI was to fulfill data needs as definedmore » during the data quality objective (DQO) process. The CAU 365 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in supporting the DQO decisions. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present to the southwest of the Baneberry crater. It was also assumed that radionuclide levels present within the crater and fissure exceed the FAL. Corrective actions were undertaken that consisted of establishing a UR and posting warning signs for the crater, fissure, and the area located to the southwest of the crater where soil concentrations exceeded the FAL. These URs were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions beyond what are described in this document are necessary for CAU 365. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 365. (3) Corrective Action Unit 365 should be moved from Appendix III to Appendix IV of the FFACO.« less
78 FR 2993 - Public Water System Supervision Program Approval for the State of Ohio
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-15
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9764-2] Public Water System Supervision Program Approval for the State of Ohio Correction In notice document 2012-30953, appearing on pages 76034-76035 in the issue of Wednesday, December 26, 2012, make the following corrections: On page 76035, in the first column, in the first full paragraph: 1. In lines...
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Sites Office's (NNSA/NSO's) approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 516, Septic Systems and Discharge Points, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. CAU 516 consists of six Corrective Action Sites: 03-59-01, Building 3C-36 Septic System; 03-59-02, Building 3C-45 Septic System; 06-51-01, Sump Piping, 06-51-02, Clay Pipe and Debris; 06-51-03, Clean Out Box and Piping; and 22-19-04, Vehicle Decontamination Area. Located in Areasmore » 3, 6, and 22 of the NTS, CAU 516 is being investigated because disposed waste may be present without appropriate controls, and hazardous and/or radioactive constituents may be present or migrating at concentrations and locations that could potentially pose a threat to human health and the environment. Existing information and process knowledge on the expected nature and extent of contamination of CAU 516 are insufficient to select preferred corrective action alternatives; therefore, additional information will be obtained by conducting a corrective action investigation. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3/2004.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NNSA /NSO
The Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 204 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 204 is located on the Nevada Test Site approximately 65 miles northwest of Las Vegas, Nevada. This CAU is comprised of six Corrective Action Sites (CASs) which include: 01-34-01, Underground Instrument House Bunker; 02-34-01, Instrument Bunker; 03-34-01, Underground Bunker; 05-18-02, Chemical Explosives Storage; 05-33-01, Kay Blockhouse; 05-99-02, Explosive Storage Bunker.more » Based on site history, process knowledge, and previous field efforts, contaminants of potential concern for Corrective Action Unit 204 collectively include radionuclides, beryllium, high explosives, lead, polychlorinated biphenyls, total petroleum hydrocarbons, silver, warfarin, and zinc phosphide. The primary question for the investigation is: ''Are existing data sufficient to evaluate appropriate corrective actions?'' To address this question, resolution of two decision statements is required. Decision I is to ''Define the nature of contamination'' by identifying any contamination above preliminary action levels (PALs); Decision II is to ''Determine the extent of contamination identified above PALs. If PALs are not exceeded, the investigation is completed. If PALs are exceeded, then Decision II must be resolved. In addition, data will be obtained to support waste management decisions. Field activities will include radiological land area surveys, geophysical surveys to identify any subsurface metallic and nonmetallic debris, field screening for applicable contaminants of potential concern, collection and analysis of surface and subsurface soil samples from biased locations, and step-out sampling to define the extent of contamination, as necessary. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 478, Area 12 T-Tunnel Ponds. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 478 is comprised of one corrective action site (CAS): • 12-23-01, Ponds (5) RAD Area The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with usemore » restrictions for CAU 478.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 559, T-Tunnel Compressor/Blower Pad. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 559 is comprised of one Corrective Action Site (CAS): • 12-25-13, Oil Stained Soil and Concrete The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictionsmore » for CAU 559.« less
9 CFR 416.15 - Corrective Actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Corrective Actions. 416.15 Section 416... SANITATION § 416.15 Corrective Actions. (a) Each official establishment shall take appropriate corrective... the procedures specified therein, or the implementation or maintenance of the Sanitation SOP's, may...
77 FR 21143 - Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-09
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...
78 FR 11947 - Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-20
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...
78 FR 17281 - Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-20
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...
77 FR 66909 - Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-07
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule... below, receiving approval for the consumptive use of water pursuant to the Commission's approval by rule...
78 FR 2315 - Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-10
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...
78 FR 15402 - Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-11
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...
77 FR 25010 - Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-26
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule... below, receiving approval for the consumptive use of water pursuant to the Commission's approval by rule...
77 FR 55892 - Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-11
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...
77 FR 55891 - Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-11
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...
77 FR 59239 - Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-26
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...
77 FR 16317 - Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-20
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...
77 FR 34455 - Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-11
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule..., receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
Corrective Action Unit 374 comprises five corrective action sites (CASs): • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 374 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at CASs 18-23-01 and 20-45-03, and a corrective action of removing potential source material (PSM) was conducted at CAS 20-45-03. The othermore » CASs require no further action; however, best management practices of removing PSM and drums at CAS 18-22-06, and removing drums at CAS 18-22-08 were performed. Corrective action investigation (CAI) activities were performed from May 4 through October 6, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigating the primary release of radionuclides and investigating other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 374 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were found to be present in the surface soil that was sampled. It is assumed that radionuclide levels present in subsurface media within the craters and ejecta fields (default contamination boundaries) at the Danny Boy and Schooner sites exceed the FAL. It is also assumed that PSM in the form of lead-acid batteries at Schooner exceeds the FAL. Therefore, corrective actions were undertaken that consist of removing PSM, where present, and implementing a use restriction and posting warning signs at the Danny Boy and Schooner sites. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 374. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 374. • Corrective Action Unit 374 should be moved from Appendix III to Appendix IV of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Corrective Action Decision Document/Corrective Action Plan provides the rationale and supporting information for the selection and implementation of corrective actions at Corrective Action Unit (CAU) 413, Clean Slate II Plutonium Dispersion (TTR). CAU 413 is located on the Tonopah Test Range and includes one corrective action site, TA-23-02CS. CAU 413 consists of the release of radionuclides to the surface and shallow subsurface from the Clean Slate II (CSII) storage–transportation test conducted on May 31, 1963. The CSII test was a non-nuclear detonation of a nuclear device located inside a concrete bunker covered with 2 feet of soil. To facilitatemore » site investigation and the evaluation of data quality objectives decisions, the releases at CAU 413 were divided into seven study groups: 1 Undisturbed Areas 2 Disturbed Areas 3 Sedimentation Areas 4 Former Staging Area 5 Buried Debris 6 Potential Source Material 7 Soil Mounds Corrective action investigation (CAI) activities, as set forth in the CAU 413 Corrective Action Investigation Plan, were performed from June 2015 through May 2016. Radionuclides detected in samples collected during the CAI were used to estimate total effective dose using the Construction Worker exposure scenario. Corrective action was required for areas where total effective dose exceeded, or was assumed to exceed, the radiological final action level (FAL) of 25 millirem per year. The results of the CAI and the assumptions made in the data quality objectives resulted in the following conclusions: The FAL is exceeded in surface soil in SG1, Undisturbed Areas; The FAL is assumed to be exceeded in SG5, Buried Debris, where contaminated debris and soil were buried after the CSII test; The FAL is not exceeded at SG2, SG3, SG4, SG6, or SG7. Because the FAL is exceeded at CAU 413, corrective action is required and corrective action alternatives (CAAs) must be evaluated. For CAU 413, three CAAs were evaluated: no further action, clean closure, and closure in place. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAU 413, and the detailed and comparative analysis of CAAs, clean closure was selected as the preferred CAA for CAU 413 by the U.S. Air Force, Nevada Division of Environmental Protection, and U.S. Department of Energy at the CAA meeting held on August 24, 2016.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
David A. Strand
2004-06-01
This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental corrective action alternatives. Corrective Action Unit 151 is located in Areas 2, 12, 18, and 20 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 151 is comprised of the nine Corrective Action Sites (CAS) listed below: (1) 02-05-01, UE-2ce Pond; (2)more » 12-03-01, Sewage Lagoons (6); (3) 12-04-01, Septic Tanks; (4) 12-04-02, Septic Tanks; (5) 12-04-03, Septic Tank; (6) 12-47-01, Wastewater Pond; (7) 18-03-01, Sewage Lagoon; (8) 18-99-09, Sewer Line (Exposed); and (9) 20-19-02, Photochemical Drain. The CASs within CAU 151 are discharge and collection systems. Corrective Action Site 02-05-01 is located in Area 2 and is a well-water collection pond used as a part of the Nash test. Corrective Action Sites 12-03-01, 12-04-01, 12-04-02, 12-04-03, and 12-47-01 are located in Area 12 and are comprised of sewage lagoons, septic tanks, associated piping, and two sumps. The features are a part of the Area 12 Camp housing and administrative septic systems. Corrective Action Sites 18-03-01 and 18-99-09 are located in the Area 17 Camp in Area 18. These sites are sewage lagoons and associated piping. The origin and terminus of CAS 18-99-09 are unknown; however, the type and configuration of the pipe indicates that it may be a part of the septic systems in Area 18. Corrective Action Site 20-19-02 is located in the Area 20 Camp. This site is comprised of a surface discharge of photoprocessing chemicals.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... have proposed the action for which financial approval is sought. Environmental checklist means a Postal... consideration means the Postal Service form that identifies the Postal Service's review of proposed activities... financial authority to approve such action. The responsible official signs the NEPA documents (FONSI, ROD...
Code of Federal Regulations, 2010 CFR
2010-10-01
... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID... Adverse Action Regarding Withdrawal of Approval of an Accreditation Body § 8.21 Applicability. The... body of an adverse action taken regarding withdrawal of approval of the accreditation body under the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID... Adverse Action Regarding Withdrawal of Approval of an Accreditation Body § 8.21 Applicability. The... body of an adverse action taken regarding withdrawal of approval of the accreditation body under the...
78 FR 45983 - Acceptability of Corrective Action Programs for Fuel Cycle Facilities
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-30
... Programs for Fuel Cycle Facilities AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; withdrawal... withdrawing draft NUREG-2154, ``Acceptability of Corrective Action Programs for Fuel Cycle Facilities,'' based... determine whether a submittal for a Corrective Action Program (CAP), voluntarily submitted by fuel cycle...
Documents Pertaining to Resource Conservation and Recovery Act Corrective Action Event Codes
Document containing RCRA Corrective Action event codes and definitions, including national requirements, initiating sources, dates, and guidance, from the first facility assessment until the Corrective Action is terminated.
40 CFR 258.58 - Implementation of the corrective action program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258... implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the corrective...
28 CFR 58.26 - Procedures for inclusion on the approved provider list.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Procedures for inclusion on the approved... RELATING TO THE BANKRUPTCY REFORM ACTS OF 1978 AND 1994 § 58.26 Procedures for inclusion on the approved... inclusion on the approved list will be taken until a new application is submitted that corrects the defects...
28 CFR 58.26 - Procedures for inclusion on the approved provider list.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Procedures for inclusion on the approved... RELATING TO THE BANKRUPTCY REFORM ACTS OF 1978 AND 1994 § 58.26 Procedures for inclusion on the approved... inclusion on the approved list will be taken until a new application is submitted that corrects the defects...
28 CFR 58.26 - Procedures for inclusion on the approved provider list.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Procedures for inclusion on the approved... RELATING TO THE BANKRUPTCY REFORM ACTS OF 1978 AND 1994 § 58.26 Procedures for inclusion on the approved... inclusion on the approved list will be taken until a new application is submitted that corrects the defects...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews and Dawn Peterson
2011-09-01
Corrective Action Unit 106 comprises four corrective action sites (CASs): (1) 05-20-02, Evaporation Pond; (2) 05-23-05, Atmospheric Test Site - Able; (3) 05-45-04, 306 GZ Rad Contaminated Area; (4) 05-45-05, 307 GZ Rad Contaminated Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 106 based on the implementation of corrective actions. The corrective action of clean closure was implemented at CASs 05-45-04 and 05-45-05, while no corrective action was necessary at CASs 05-20-02 and 05-23-05. Corrective action investigation (CAI) activities were performed from October 20,more » 2010, through June 1, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 106: Areas 5, 11 Frenchman Flat Atmospheric Sites. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (mechanical displacement and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 106 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Industrial Area exposure scenario (2,250 hours of annual exposure). The only radiological dose exceeding the FAL was at CAS 05-45-05 and was associated with potential source material (PSM). It is also assumed that additional PSM in the form of depleted uranium (DU) and DU-contaminated debris at CASs 05-45-04 and 05-45-05 exceed the FAL. Therefore, corrective actions were undertaken at these CASs that consisted of removing PSM and collecting verification samples. Results of verification samples show that remaining soil does not contain contamination exceeding the FALs. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) provides the following recommendations: (1) No further corrective actions are necessary for CAU 106. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 106. (3) Corrective Action Unit 106 should be moved from Appendix III to Appendix IV of the FFACO.« less
Apollo experience report: Problem reporting and corrective action system
NASA Technical Reports Server (NTRS)
Adams, T. J.
1974-01-01
The Apollo spacecraft Problem Reporting and Corrective Action System is presented. The evolution from the early system to the present day system is described. The deficiencies and the actions taken to correct them are noted, as are management controls for both the contractor and NASA. Significant experience gained from the Apollo Problem Reporting and Corrective Action System that may be applicable to future manned spacecraft is presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
Corrective Action Unit (CAU) 576 is located in Areas 2, 3, 5, 8, and 9 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 576 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 576, which comprises the following corrective action sites (CASs): 00-99-01, Potential Source Material; 02-99-12, U-2af (Kennebec) Surface Rad-Chem Piping; 03-99-20, Area 3 Subsurface Rad-Chem Piping; 05-19-04, Frenchman Flat Rad Waste Dump ; 09-99-08, U-9x (Allegheny) Subsurface Rad-Chem Piping; 09-99-09, U-9its u24more » (Avens-Alkermes) Surface Contaminated Flex Line These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document (CADD).« less
40 CFR 258.73 - Financial assurance for corrective action.
Code of Federal Regulations, 2011 CFR
2011-07-01
... action. 258.73 Section 258.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... the cost of hiring a third party to perform the corrective action in accordance with the program required under § 258.58 of this part. The corrective action cost estimate must account for the total costs...
40 CFR 258.73 - Financial assurance for corrective action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... action. 258.73 Section 258.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... the cost of hiring a third party to perform the corrective action in accordance with the program required under § 258.58 of this part. The corrective action cost estimate must account for the total costs...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-06-01
Corrective Action Unit 367 comprises four corrective action sites (CASs): • 10-09-03, Mud Pit • 10-45-01, U-10h Crater (Sedan) • 10-45-02, Ess Crater Site • 10-45-03, Uncle Crater Site The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation of the corrective actions and site closure activities implemented at CAU 367. A corrective action of closure in place with use restrictions was completed at each of the three crater CASs (10-45-01, 10-45-02, and 10-45-03); corrective actions were not required at CAS 10-09-03. In addition, a limited soil removal corrective action was conducted at the locationmore » of a potential source material release. Based on completion of these correction actions, no additional corrective action is required at CAU 367, and site closure is considered complete. Corrective action investigation (CAI) activities were performed from February 2010 through March 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of non-test or other releases (e.g., migration in washes and potential source material). Based on the proximity of the Uncle, Ess, and Sedan craters, the impact of the Sedan test on the fallout deposited from the two earlier tests, and aerial radiological surveys, the CAU 367 investigation was designed to study the releases from the three crater CASs as one combined release (primary release). Corrective Action Site 10-09-03, Mud Pit, consists of two mud pits identified at CAU 367. The mud pits are considered non-test releases or other releases and were investigated independent of the three crater CASs. The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 367 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. For the primary release, radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface or shallow subsurface soil outside the default contamination boundary. However, it was assumed that radionuclides are present in subsurface media within each of the three craters (Sedan, Ess, and Uncle) due to prompt injection of radionuclides from the tests. Based on the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consisted of implementing a use restriction and posting warning signs at each crater CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. With regard to other releases, no contaminants of concern were identified at the mud pits or any of the other release locations, with one exception. Potential source material in the form of lead was found at one location. A corrective action of clean closure was implemented at this location, and verification samples indicated that no further action is necessary. Therefore, NNSA/NSO provides the following recommendations: • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 367. • Corrective Action Unit 367 should be promoted from Appendix III to Appendix IV of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2013-11-01
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The purpose of the CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed.
Closure Report for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2010-02-28
Corrective Action Unit (CAU) 563 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Septic Systems” and consists of the following four Corrective Action Sites (CASs), located in Areas 3 and 12 of the Nevada Test Site: · CAS 03-04-02, Area 3 Subdock Septic Tank · CAS 03-59-05, Area 3 Subdock Cesspool · CAS 12-59-01, Drilling/Welding Shop Septic Tanks · CAS 12-60-01, Drilling/Welding Shop Outfalls Closure activities were conducted from September to November 2009 in accordance with the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 563. The corrective action alternatives includedmore » No Further Action and Clean Closure.« less
4 CFR 28.131 - Corrective action proceedings.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Accounts GOVERNMENT ACCOUNTABILITY OFFICE GENERAL PROCEDURES GOVERNMENT ACCOUNTABILITY OFFICE PERSONNEL APPEALS BOARD; PROCEDURES APPLICABLE TO CLAIMS CONCERNING EMPLOYMENT PRACTICES AT THE GOVERNMENT ACCOUNTABILITY OFFICE Corrective Action, Disciplinary and Stay Proceedings § 28.131 Corrective action proceedings...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document/Closure Report (CADD/CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is the joint responsibility of DTRA and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense. Corrective Action Unit 383 is comprised of three Corrective Action Sites (CASs) and two adjacent areas: • CAS 12-06-06, Muckpile •more » CAS 12-25-02, Oil Spill • CAS 12-28-02, Radioactive Material • Drainage below the Muckpile • Ponds 1, 2, and 3 The purpose of this CADD/CR is to provide justification and documentation to support the recommendation for closure with no further corrective action, by placing use restrictions at the three CASs and two adjacent areas of CAU 383.« less
34 CFR 200.49 - SEA responsibilities for school improvement, corrective action, and restructuring.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 1 2010-07-01 2010-07-01 false SEA responsibilities for school improvement, corrective... Agencies Lea and School Improvement § 200.49 SEA responsibilities for school improvement, corrective action... subject to corrective action on January 7, 2002, the SEA must ensure that the LEA for that school provides...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-13
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAD09000.L14300000.ES0000; CACA- 051457] Correction for Notice of Realty Action; Recreation and Public Purposes Act Classification; California AGENCY: Bureau of Land Management, Interior. ACTION: Correction SUMMARY: This notice corrects a Notice of Realty...
76 FR 2673 - Procurement List Proposed Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-14
... factors considered for this certification were: 1. If approved, the action will not result in any.... Contracting Activity: Dept. of Health and Human Services, National Institutes of Health, Research Triangle... entities. The major factors considered for this certification were: 1. If approved, the action will not...
Corrective Action Sites around the Nation
Provide info to the public/community orgs, local officials & consultants on nearby corrective action cleanups, the status of the cleanup and future plans. Links to the Natl Corrective Action, Cleanups in My Community & Cleaning Up Our Land, Water & Air
16 CFR 1209.37 - Corrective actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.37 Corrective actions. (a) Test failure... insulation product itself. Corrective action may consist of equipment adjustment, equipment repair, equipment...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-07-01
The glossary of technical terms was prepared to facilitate the use of the Corrective Action Plan (CAP) issued by OSWER on November 14, 1986. The CAP presents model scopes of work for all phases of a corrective action program, including the RCRA Facility Investigation (RFI), Corrective Measures Study (CMS), Corrective Measures Implementation (CMI), and interim measures. The Corrective Action Glossary includes brief definitions of the technical terms used in the CAP and explains how they are used. In addition, expected ranges (where applicable) are provided. Parameters or terms not discussed in the CAP, but commonly associated with site investigations ormore » remediations are also included.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krause
2010-08-01
This Corrective Action Decision Document (CADD) presents information supporting the selection of corrective action alternatives (CAAs) leading to the closure of Corrective Action Unit (CAU) 562, Waste Systems, in Areas 2, 23, and 25 of the Nevada Test Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 562 comprises the following corrective action sites (CASs): • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drainmore » • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Building 3123 Outfalls The purpose of this CADD is to identify and provide the rationale for the recommendation of CAAs for the 13 CASs within CAU 562. Corrective action investigation (CAI) activities were performed from July 27, 2009, through May 12, 2010, as set forth in the CAU 562 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether COCs are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. A data quality assessment (DQA) performed on the CAU 562 data demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at 10 of the 13 CASs in CAU 562, and thus corrective action is required. Assessment of the data generated from investigation activities conducted at CAU 562 is shown in Table ES-1. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 13 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 562. • No further action is the preferred corrective action for CASs 02-60-01, 02-60-06, and 02-60-07. • Clean closure is the preferred corrective action for CASs 02-26-11, 02-44-02, 02-59-01, 02-60-02, 02-60-03, 02-60-04, 02-60-05, 23-60-01, 23-99-06, and 25-60-04. The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposures to contaminated media to acceptable levels. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • No further corrective action is required at CASs 02-60-01, 02-60-06, and 02-60-07. • Clean closure is recommended for the remaining 10 CASs in CAU 562. • A Corrective Action Plan will be submitted to the Nevada Division of Environmental Protection that contains a detailed description of the proposed actions that will be taken to implement the selected corrective actions.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2006-09-01
This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 274, Septic Systems, Nevada Test Site (NTS), Nevada in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit (CAU) 274 is comprised of five corrective action sites (CASs): (1) CAS 03-02-01, WX-6 ETS Building Septic System; (2) CAS 06-02-01, Cesspool; (3) CAS 09-01-01, Spill Site; (4) CAS 09-05-01, Leaching Pit; and (5) CAS 20-05-01, Septic System. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the closure of CAU 274 with no further corrective action. Tomore » achieve this, corrective action investigation (CAI) activities were performed from November 14 through December 17, 2005 as set forth in the CAU 274 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If contaminants of concern are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 274 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. No analytes were detected at concentrations exceeding the FALs. No COCs have been released to the soil at CAU 274, and corrective action is not required. Therefore, the DQO data needs were met, and it was determined that no corrective action based on risk to human receptors is necessary for the site. All FALs were calculated using the industrial site worker scenario except for benzo(a)pyrene, which was calculated based on the occasional use scenario. Benzo(a)pyrene was detected above the preliminary action level at CAS 20-05-01; however, it was not identified as a COC because the concentration was below the FAL. As a best management practice and to ensure that future site workers are not exposed to this site contaminant for more than this decision-basis exposure duration, an administrative use restriction was established around the leachfield at CAS 20-05-01. In addition, the removal of the septic tanks and septic tank contents at CASs 03-02-01, 06-02-01, and 20-05-01 was performed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2011-04-30
This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closedmore » by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation activities. (11) CAS 23-60-01, Mud Trap Drain and Outfall, will be clean closed by removing sediment from the mud trap. As a BMP, the mud trap and outfall pipe will be removed. (12) CAS 23-99-06, Grease Trap, will be clean closed by removing sediment from the grease trap and backfilling the grease trap with grout. (13) CAS 25-60-04, Building 3123 Outfalls, will be clean closed by removing contaminated soil and the sludge-containing outfall pipe.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 214 under the Federal Facility Agreement and Consent Order. Located in Areas 5, 11, and 25 of the Nevada Test Site, CAU 214 consists of nine Corrective Action Sites (CASs): 05-99-01, Fallout Shelters; 11-22-03, Drum; 25-99-12, Fly Ash Storage; 25-23-01, Contaminated Materials; 25-23-19, Radioactive Material Storage; 25-99-18, Storage Area; 25-34-03, Motor Dr/Gr Assembly (Bunker); 25-34-04, Motor Dr/Gr Assembly (Bunker); and 25-34-05, Motormore » Dr/Gr Assembly (Bunker). These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). The suspected contaminants and critical analyte s for CAU 214 include oil (total petroleum hydrocarbons-diesel-range organics [TPH-DRO], polychlorinated biphenyls [PCBs]), pesticides (chlordane, heptachlor, 4,4-DDT), barium, cadmium, chronium, lubricants (TPH-DRO, TPH-gasoline-range organics [GRO]), and fly ash (arsenic). The land-use zones where CAU 214 CASs are located dictate that future land uses will be limited to nonresidential (i.e., industrial) activities. The results of this field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the corrective action decision document.« less
77 FR 12350 - Agency Information Collection Activities: Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-29
... this collection at 76 FR 78068, on December 15, 2011. We provide correct burden data here. Type of... OMB-approved information collection. Type of Request: Revision of an OMB-approved information... applicants and recipients. Type of Request: Extension of an OMB-approved information collection. Average...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-08
... and Promulgation of Air Quality Implementation Plans; New Hampshire; Reasonably Available Control... Implementation Plan (SIP) revision submitted by the State of New Hampshire. The revision establishes Reasonably... intended effect of this action is to approve these requirements into the New Hampshire SIP. This action is...
8 CFR 103.9 - Request for further action on an approved benefit request.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 8 Aliens and Nationality 1 2013-01-01 2013-01-01 false Request for further action on an approved benefit request. 103.9 Section 103.9 Aliens and Nationality DEPARTMENT OF HOMELAND SECURITY IMMIGRATION REGULATIONS IMMIGRATION BENEFITS; BIOMETRIC REQUIREMENTS; AVAILABILITY OF RECORDS Applying for Benefits...
8 CFR 103.9 - Request for further action on an approved benefit request.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 8 Aliens and Nationality 1 2012-01-01 2012-01-01 false Request for further action on an approved benefit request. 103.9 Section 103.9 Aliens and Nationality DEPARTMENT OF HOMELAND SECURITY IMMIGRATION REGULATIONS IMMIGRATION BENEFITS; BIOMETRIC REQUIREMENTS; AVAILABILITY OF RECORDS Applying for Benefits...
8 CFR 103.9 - Request for further action on an approved benefit request.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 8 Aliens and Nationality 1 2014-01-01 2014-01-01 false Request for further action on an approved benefit request. 103.9 Section 103.9 Aliens and Nationality DEPARTMENT OF HOMELAND SECURITY IMMIGRATION REGULATIONS IMMIGRATION BENEFITS; BIOMETRIC REQUIREMENTS; AVAILABILITY OF RECORDS Applying for Benefits...
Evaluation of Corrective Action Team (CAT) Leader Training in Aeronautical Systems Division
1991-09-01
00A DI EVALUATION OF CORRECTIVE ACTION TEAM ( CAT ) LEADER TRAINING IN AERONAUTICAL SYSTEMS DIVISION CA THESIS Kirk J. Streitrater, Captain, USAF AFIT...EVALUATION OF CORRECTIVE ACTION TEAM ( CAT ) LEADER TRAINING IN AERONAUTICAL SYSTEMS DIVISION THESIS Kirk J. Streitmater, Captain, USAF AFIT/GSM/LSR/91S-25...8217, , C- s :C AFIT/GSM/LSR/91S-25 EVALUATION OF CORRECTIVE ACTION TEAM ( CAT ) LEADER TRAINING IN AERONAUTICAL SYSTEMS DIVISION THESIS Presented to the
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick K.
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 550: Smoky Contamination Area, Nevada National Security Site, Nevada. CAU 550 includes 19 corrective action sites (CASs), which consist of one weapons-related atmospheric test (Smoky), three safety experiments (Ceres, Oberon, Titania), and 15 debris sites (Table ES-1). The CASs were sorted into the following study groups based on release potential and technical similarities: • Study Group 1, Atmospheric Test • Study Group 2, Safety Experiments • Study Group 3, Washes • Study Group 4, Debris The purpose of this document is to provide justificationmore » and documentation supporting the conclusion that no further corrective action is needed for CAU 550 based on implementation of the corrective actions listed in Table ES-1. Corrective action investigation (CAI) activities were performed between August 2012 and October 2013 as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area; and in accordance with the Soils Activity Quality Assurance Plan. The approach for the CAI was to investigate and make data quality objective (DQO) decisions based on the types of releases present. The purpose of the CAI was to fulfill data needs as defined during the DQO process. The CAU 550 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick and Sloop, Christy
2011-04-01
This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 372, Area 20 Cabriolet/Palanquin Unit Craters, located within Areas 18 and 20 at the Nevada National Security Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 372 comprises four corrective action sites (CASs): • 18-45-02, Little Feller I Surface Crater • 18-45-03, Little Feller II Surface Crater • 20-23-01, U-20k Contamination Area • 20-45-01, U-20L Crater (Cabriolet) The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action ismore » needed for CAU 372 based on the implementation of the corrective action of closure in place with administrative controls at all CASs. Corrective action investigation (CAI) activities were performed from November 9, 2009, through December 10, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 372 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL was established of 25 millirem per year based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present at all four CASs. It is assumed that radionuclide levels present within the Little Feller I and Cabriolet high contamination areas and within the craters at Palanquin and Cabriolet exceed the FAL. It is also assumed that potential source material in the form of lead bricks at Little Feller I and lead-acid batteries at Palanquin and Cabriolet exceed the FAL. Therefore, corrective actions were undertaken that consist of removing potential source material, where present, and implementing a use restriction and posting warning signs at each CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 372. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 372. • Corrective Action Unit 372 should be moved from Appendix III to Appendix IV of the FFACO.« less
40 CFR 147.2914 - Corrective action for wells authorized by rule.
Code of Federal Regulations, 2010 CFR
2010-07-01
... potential endangerment of an USDW, then action as described in paragraph (a) (1) or (2) of this section must... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Corrective action for wells authorized... PROGRAMS Osage Mineral Reserve-Class II Wells § 147.2914 Corrective action for wells authorized by rule...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-03
... Previously Approved Information Collection(s): Uniform Administrative Requirements for Grants and Cooperative... Higher Education, Hospitals, and Other Nonprofit Organizations AGENCY: Office of the Secretary. ACTION... approved information collection. This information collection involves the use of various forms necessary...
76 FR 53526 - Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule... lists the projects, described below, receiving approval for the consumptive use of water pursuant to the...
77 FR 4859 - Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-31
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule... notice lists the projects, described below, receiving approval for the consumptive use of water pursuant...
76 FR 66117 - Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-25
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule... notice lists the projects, described below, receiving approval for the consumptive use of water pursuant...
76 FR 42159 - Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-18
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects approved by rule... lists the projects, described below, receiving approval for the consumptive use of water pursuant to the...
76 FR 39870 - Agency Information Collection Activities; OMB Responses
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-07
... 06/30/2014; Approved without change. EPA ICR Number 1741.06; Correction of Misreported Chemical Substances on the Toxic Substances Control Act (TSCA) Chemical Substances Inventory; was approved on 06/01... 2070-0028; expires on 06/30/2014; Approved without change. EPA ICR Number 1198.09; Chemical-Specific...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Andrews, Robert; Marutzky, Sam
2000-09-01
This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) approach to collect the data necessary to evaluate Corrective Action Alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 97 under the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 97, collectively known as the Yucca Flat/Climax Mine CAU, consists of 720 Corrective Action Sites (CASs). The Yucca Flat/Climax Mine CAU extends over several areas of the NTS and constitutes one of several areas used for underground nuclear testing in the past. The nuclear tests resulted in groundwater contamination in themore » vicinity as well as downgradient of the underground test areas. Based on site history, the Yucca Flat underground nuclear tests were conducted in alluvial, volcanic, and carbonate rocks; whereas, the Climax Mine tests were conducted in an igneous intrusion located in northern Yucca Flat. Particle-tracking simulations performed during the regional evaluation indicate that the local Climax Mine groundwater flow system merges into the much larger Yucca Flat groundwater flow systems during the 1,000-year time period of interest. Addressing these two areas jointly and simultaneously investigating them as a combined CAU has been determined the best way to proceed with corrective action investigation (CAI) activities. The purpose and scope of the CAI includes characterization activities and model development conducted in five major sequential steps designed to be consistent with FFACO Underground Test Area Project's strategy to predict the location of the contaminant boundary, develop and implement a corrective action, and close each CAU. The results of this field investigation will support a defensible evaluation of CAAs in the subsequent corrective action decision document.« less
Survey of Radar Refraction Error Corrections
2016-11-01
ELECTRONIC TRAJECTORY MEASUREMENTS GROUP RCC 266-16 SURVEY OF RADAR REFRACTION ERROR CORRECTIONS DISTRIBUTION A: Approved for...DOCUMENT 266-16 SURVEY OF RADAR REFRACTION ERROR CORRECTIONS November 2016 Prepared by Electronic...This page intentionally left blank. Survey of Radar Refraction Error Corrections, RCC 266-16 iii Table of Contents Preface
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, Nevada Operations Office
2000-02-08
This Corrective Action Decision Document identifies and rationalizes the US Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 428, Septic Waste Systems 1 and 5, under the Federal Facility Agreement and Consent Order. Located in Area 3 at the Tonopah Test Range (TTR) in Nevada, CAU 428 is comprised of two Corrective Action Sites (CASs): (1) CAS 03-05-002-SW01, Septic Waste System 1 and (2) CAS 03-05-002- SW05, Septic Waste System 5. A corrective action investigation performed in 1999 detected analyte concentrations that exceeded preliminarymore » action levels; specifically, contaminants of concern (COCs) included benzo(a) pyrene in a septic tank integrity sample associated with Septic Tank 33-1A of Septic Waste System 1, and arsenic in a soil sample associated with Septic Waste System 5. During this investigation, three Corrective Action Objectives (CAOs) were identified to prevent or mitigate exposure to contents of the septic tanks and distribution box, to subsurface soil containing COCs, and the spread of COCs beyond the CAU. Based on these CAOs, a review of existing data, future use, and current operations in Area 3 of the TTR, three CAAs were developed for consideration: Alternative 1 - No Further Action; Alternative 2 - Closure in Place with Administrative Controls; and Alternative 3 - Clean Closure by Excavation and Disposal. These alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of the evaluation, the preferred CAA was Alternative 3. This alternative meets all applicable state and federal regulations for closure of the site and will eliminate potential future exposure pathways to the contaminated soils at the Area 3 Septic Waste Systems 1 and 5.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2008-02-01
This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended January 2007). The corrective action sites (CASs) for CAU 563 are located in Areas 3 and 12 of the Nevada Test Site, Nevada, and are comprised of the following four sites: •03-04-02, Area 3 Subdock Septic Tank •03-59-05, Area 3 Subdock Cesspool •12-59-01, Drilling/Welding Shop Septic Tanks •12-60-01, Drilling/Welding Shop Outfalls The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a correctivemore » action alternative (CAA) for the four CASs within CAU 563. Corrective action investigation (CAI) activities were performed from July 17 through November 19, 2007, as set forth in the CAU 563 Corrective Action Investigation Plan (NNSA/NSO, 2007). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern (COCs) for each CAS. The results of the CAI identified COCs at one of the four CASs in CAU 563 and required the evaluation of CAAs. Assessment of the data generated from investigation activities conducted at CAU 563 revealed the following: •CASs 03-04-02, 03-59-05, and 12-60-01 do not contain contamination at concentrations exceeding the FALs. •CAS 12-59-01 contains arsenic and chromium contamination above FALs in surface and near-surface soils surrounding a stained location within the site. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAS 12-59-01, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 563.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office
This Corrective Action Investigation Plan contains the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 527, Horn Silver Mine, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 527 consists of one Corrective Action Site (CAS): 26-20-01, Contaminated Waste Dump No.1. The site is located in an abandoned mine site in Area 26 (which is the most arid part of the NTS) approximately 65 miles northwest of Las Vegas. Historicalmore » documents may refer to this site as CAU 168, CWD-1, the Wingfield mine (or shaft), and the Wahmonie mine (or shaft). Historical documentation indicates that between 1959 and the 1970s, nonliquid classified material and unclassified waste was placed in the Horn Silver Mine's shaft. Some of the waste is known to be radioactive. Documentation indicates that the waste is present from 150 feet to the bottom of the mine (500 ft below ground surface). This CAU is being investigated because hazardous constituents migrating from materials and/or wastes disposed of in the Horn Silver Mine may pose a threat to human health and the environment as well as to assess the potential impacts associated with any potential releases from the waste. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
David A. Strand
This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 224: Decon Pad and Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (DoD). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 224 is comprised of themore » nine Corrective Action Sites (CASs) listed below: 02-04-01, Septic Tank (Buried); 03-05-01, Leachfield; 05-04-01, Septic Tanks (4)/Discharge Area; 06-03-01, Sewage Lagoons (3); 06-05-01, Leachfield; 06-17-04, Decon Pad and Wastewater Catch; 06-23-01, Decon Pad Discharge Piping; 11-04-01, Sewage Lagoon; and 23-05-02, Leachfield. Corrective Action Sites 06-05-01, 06-23-01, and 23-05-02 were identified in the 1991 Reynolds Electrical & Engineering Co., Inc. (REECo) inventory (1991). The remaining sites were identified during review of various historical documents. Additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating and selecting a corrective action alternative for each CAS. The CAI will include field inspections, radiological and geological surveys, and sample collection. Data will also be obtained to support investigation-derived waste (IDW) disposal and potential future waste management decisions.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-07
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9099-3] Cross-Media Electronic Reporting Rule State Approved...). ACTION: Notice. SUMMARY: This notice announces EPA's approval, under regulations for Cross-Media..., [email protected] . SUPPLEMENTARY INFORMATION: On October 13, 2005, the final Cross-Media Electronic...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-05-01
Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate andmore » recommend corrective action alternatives.« less
21 CFR 814.45 - Denial of approval of a PMA.
Code of Federal Regulations, 2014 CFR
2014-04-01
...) MEDICAL DEVICES PREMARKET APPROVAL OF MEDICAL DEVICES FDA Action on a PMA § 814.45 Denial of approval of a PMA. (a) FDA may issue an order denying approval of a PMA if the applicant fails to follow the... information before the agency, FDA determines that any of the grounds for denying approval of a PMA specified...
21 CFR 814.45 - Denial of approval of a PMA.
Code of Federal Regulations, 2013 CFR
2013-04-01
...) MEDICAL DEVICES PREMARKET APPROVAL OF MEDICAL DEVICES FDA Action on a PMA § 814.45 Denial of approval of a PMA. (a) FDA may issue an order denying approval of a PMA if the applicant fails to follow the... information before the agency, FDA determines that any of the grounds for denying approval of a PMA specified...
21 CFR 814.45 - Denial of approval of a PMA.
Code of Federal Regulations, 2010 CFR
2010-04-01
...) MEDICAL DEVICES PREMARKET APPROVAL OF MEDICAL DEVICES FDA Action on a PMA § 814.45 Denial of approval of a PMA. (a) FDA may issue an order denying approval of a PMA if the applicant fails to follow the... information before the agency, FDA determines that any of the grounds for denying approval of a PMA specified...
Code of Federal Regulations, 2010 CFR
2010-04-01
... HUMAN USE APPLICATIONS FOR FDA APPROVAL TO MARKET A NEW DRUG FDA Action on Applications and Abbreviated... of an applicant, FDA may, on the basis of new data, approve an application or abbreviated application which it had previously refused, suspended, or withdrawn approval. FDA will publish a notice in the...
Code of Federal Regulations, 2012 CFR
2012-04-01
... HUMAN USE APPLICATIONS FOR FDA APPROVAL TO MARKET A NEW DRUG FDA Action on Applications and Abbreviated... of an applicant, FDA may, on the basis of new data, approve an application or abbreviated application which it had previously refused, suspended, or withdrawn approval. FDA will publish a notice in the...
Code of Federal Regulations, 2011 CFR
2011-04-01
... HUMAN USE APPLICATIONS FOR FDA APPROVAL TO MARKET A NEW DRUG FDA Action on Applications and Abbreviated... of an applicant, FDA may, on the basis of new data, approve an application or abbreviated application which it had previously refused, suspended, or withdrawn approval. FDA will publish a notice in the...
Code of Federal Regulations, 2014 CFR
2014-04-01
... HUMAN USE APPLICATIONS FOR FDA APPROVAL TO MARKET A NEW DRUG FDA Action on Applications and Abbreviated... of an applicant, FDA may, on the basis of new data, approve an application or abbreviated application which it had previously refused, suspended, or withdrawn approval. FDA will publish a notice in the...
Code of Federal Regulations, 2013 CFR
2013-04-01
... HUMAN USE APPLICATIONS FOR FDA APPROVAL TO MARKET A NEW DRUG FDA Action on Applications and Abbreviated... of an applicant, FDA may, on the basis of new data, approve an application or abbreviated application which it had previously refused, suspended, or withdrawn approval. FDA will publish a notice in the...
Skjerdal, Taran; Gefferth, Andras; Spajic, Miroslav; Estanga, Edurne Gaston; de Cecare, Alessandra; Vitali, Silvia; Pasquali, Frederique; Bovo, Federica; Manfreda, Gerardo; Mancusi, Rocco; Trevisiani, Marcello; Tessema, Girum Tadesse; Fagereng, Tone; Moen, Lena Haugland; Lyshaug, Lars; Koidis, Anastasios; Delgado-Pando, Gonzalo; Stratakos, Alexandros Ch; Boeri, Marco; From, Cecilie; Syed, Hyat; Muccioli, Mirko; Mulazzani, Roberto; Halbert, Catherine
2017-01-01
A prototype decision support IT-tool for the food industry was developed in the STARTEC project. Typical processes and decision steps were mapped using real life production scenarios of participating food companies manufacturing complex ready-to-eat foods. Companies looked for a more integrated approach when making food safety decisions that would align with existing HACCP systems. The tool was designed with shelf life assessments and data on safety, quality, and costs, using a pasta salad meal as a case product. The process flow chart was used as starting point, with simulation options at each process step. Key parameters like pH, water activity, costs of ingredients and salaries, and default models for calculations of Listeria monocytogenes , quality scores, and vitamin C, were placed in an interactive database. Customization of the models and settings was possible on the user-interface. The simulation module outputs were provided as detailed curves or categorized as "good"; "sufficient"; or "corrective action needed" based on threshold limit values set by the user. Possible corrective actions were suggested by the system. The tool was tested and approved by end-users based on selected ready-to-eat food products. Compared to other decision support tools, the STARTEC-tool is product-specific and multidisciplinary and includes interpretation and targeted recommendations for end-users.
Gefferth, Andras; Spajic, Miroslav; Estanga, Edurne Gaston; Vitali, Silvia; Pasquali, Frederique; Bovo, Federica; Manfreda, Gerardo; Mancusi, Rocco; Tessema, Girum Tadesse; Fagereng, Tone; Moen, Lena Haugland; Lyshaug, Lars; Koidis, Anastasios; Delgado-Pando, Gonzalo; Stratakos, Alexandros Ch.; Boeri, Marco; From, Cecilie; Syed, Hyat; Muccioli, Mirko; Mulazzani, Roberto; Halbert, Catherine
2017-01-01
A prototype decision support IT-tool for the food industry was developed in the STARTEC project. Typical processes and decision steps were mapped using real life production scenarios of participating food companies manufacturing complex ready-to-eat foods. Companies looked for a more integrated approach when making food safety decisions that would align with existing HACCP systems. The tool was designed with shelf life assessments and data on safety, quality, and costs, using a pasta salad meal as a case product. The process flow chart was used as starting point, with simulation options at each process step. Key parameters like pH, water activity, costs of ingredients and salaries, and default models for calculations of Listeria monocytogenes, quality scores, and vitamin C, were placed in an interactive database. Customization of the models and settings was possible on the user-interface. The simulation module outputs were provided as detailed curves or categorized as “good”; “sufficient”; or “corrective action needed” based on threshold limit values set by the user. Possible corrective actions were suggested by the system. The tool was tested and approved by end-users based on selected ready-to-eat food products. Compared to other decision support tools, the STARTEC-tool is product-specific and multidisciplinary and includes interpretation and targeted recommendations for end-users. PMID:29457031
RCRA Corrective Action training to develop and enhance the skills of qualified personnel who will implement corrective actions for their sites by the year 2020 that are protective of human health and the environment while encouraging revitalization.
40 CFR 280.66 - Corrective action plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Corrective action plan. 280.66 Section 280.66 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED... additional information or to develop and submit a corrective action plan for responding to contaminated soils...
40 CFR 35.3170 - Corrective action.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Corrective action. 35.3170 Section 35.3170 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE State Water Pollution Control Revolving Funds § 35.3170 Corrective action. (a...
40 CFR 35.3170 - Corrective action.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Corrective action. 35.3170 Section 35.3170 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE State Water Pollution Control Revolving Funds § 35.3170 Corrective action. (a...
40 CFR 35.3170 - Corrective action.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Corrective action. 35.3170 Section 35.3170 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE State Water Pollution Control Revolving Funds § 35.3170 Corrective action. (a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-30
... Department of Agriculture AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: The Environmental Protection Agency (EPA) is taking final action to approve North Dakota Department of Agriculture's... Department of Agriculture (iv) The initials RMP mean Risk Management Plan (v) The initials CFR mean Code of...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2014 CFR
2014-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2010 CFR
2010-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2011 CFR
2011-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2012 CFR
2012-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2013 CFR
2013-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-15
... Implementation Plan (SIP); Prevention of Significant Deterioration (PSD) AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Texas PSD State... revision submitted July 16, 2010. This action makes no significant changes to the Texas PSD SIP; it merely...
75 FR 80493 - Public Water System Supervision Program Approval for the State of Wisconsin
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-22
... the State of Wisconsin AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of tentative... implementation. This approval action does not extend to public water systems (PWSs) in Indian Country, as the... and the Regional Administrator does not elect to hold a hearing on his own motion, this determination...
77 FR 15367 - Public Water System Supervision Program Approval for the State of Minnesota
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-15
... the State of Minnesota AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of tentative.... This approval action does not extend to public water systems in Indian Country, as the term is defined... hold a hearing on her own motion, this determination shall become final and effective on April 16, 2012...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-20
... Nonattainment Area to Attainment AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY... four separate but related actions. First, EPA is proposing to approve the December 18, 2009, PM 2.5 redesignation request, including the December 22, 2010, Motor Vehicle Emission Simulator (MOVES) mobile model...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-25
... controls are enforced through the associated SIP rules or Federal Implementation Plans (FIPs). Any purchase... Promulgation of Implementation Plans; Georgia 110(a)(1) and (2) Infrastructure Requirements for the 1997 and... Agency (EPA). ACTION: Final rule. SUMMARY: EPA is taking final action to approve the State Implementation...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-01-01
CAU 568 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 568, which comprises the following corrective action sites (CASs): • 03-23-17, S-3I Contamination Area • 03-23-19, T-3U Contamination Area • 03-23-20, Otero Contamination Area • 03-23-22, Platypus Contamination Area • 03-23-23, San Juan Contamination Area • 03-23-26, Shrew/Wolverine Contamination Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained bymore » conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Stationmore » (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-08-01
Corrective Action Unit 375 comprises three corrective action sites (CASs): (1) 25-23-22, Contaminated Soils Site; (2) 25-34-06, Test Cell A Bunker; and (3) 30-45-01, U-30a, b, c, d, e Craters. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 375 based on the implementation of corrective action of closure in place with administrative controls at CAS 25-23-22, no further action at CAS 25-34-06, and closure in place with administrative controls and removal of potential source material (PSM) at CAS 30-45-01. Corrective action investigation (CAI) activities weremore » performed from July 28, 2010, through April 4, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 375 dataset of investigation results was evaluated based on the data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were assumed to be present within the default contamination boundaries at CASs 25-23-22 and 30-45-01. No contaminants were identified at CAS 25-34-06, and no corrective action is necessary. Potential source material in the form of lead plate, lead-acid batteries, and oil within an abandoned transformer were identified at CAS 30-45-01, and corrective actions were undertaken that consisted of removing the PSM. Use restrictions and warning signs were implemented for the remaining radiological contamination at CASs 25-23-22 and 30-45-01. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions are necessary for CAU 375; (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 375; and (3) Move CAU 375 from Appendix III to Appendix IV of the FFACO.« less
75 FR 71177 - Notice of Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-22
... SUSQUEHANNA RIVER BASIN COMMISSION Notice of Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice of approved projects. SUMMARY: This notice... for the consumptive use of water pursuant to the Commission's approval by rule process set forth in 18...
75 FR 23837 - Notice of Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-04
... SUSQUEHANNA RIVER BASIN COMMISSION Notice of Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice of approved projects. SUMMARY: This notice... consumptive use of water pursuant to the Commission's approval by rule process set forth in 18 CFR 806.22(e...
75 FR 38591 - Notice of Projects Approved for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-02
... SUSQUEHANNA RIVER BASIN COMMISSION Notice of Projects Approved for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice of Approved Projects. SUMMARY: This notice... consumptive use of water pursuant to the Commission's approval by rule process set forth in and 18 CFR 806.22...
7 CFR 1781.19 - Approval, closing, and cancellation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 12 2010-01-01 2010-01-01 false Approval, closing, and cancellation. 1781.19 Section...) LOANS AND ADVANCES § 1781.19 Approval, closing, and cancellation. (a) Approval and closing actions will... included in the list of sponsoring or co-sponsoring local organizations in the plan. (2) Closing...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-29
... Activities; Submission to OMB for Review and Approval; Comment Request; NESHAP for Miscellaneous Organic Chemical Manufacturing (Renewal) AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: In... review and approval. This is a request to renew an existing approved collection. The ICR which is...
40 CFR 63.1382 - Emission standards
Code of Federal Regulations, 2010 CFR
2010-07-01
... complete corrective actions in a timely manner according to the procedures in the operations, maintenance... or operator must initiate corrective action within 1 hour of an alarm from a bag leak detection system and complete corrective actions in a timely manner according to the procedures in the operations...
9 CFR 417.3 - Corrective actions.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Corrective actions. 417.3 Section 417.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS § 417.3 Corrective actions. (a) The written HACCP plan...
9 CFR 417.3 - Corrective actions.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Corrective actions. 417.3 Section 417.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS § 417.3 Corrective actions. (a) The written HACCP plan...
9 CFR 417.3 - Corrective actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Corrective actions. 417.3 Section 417.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS § 417.3 Corrective actions. (a) The written HACCP plan...
9 CFR 417.3 - Corrective actions.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Corrective actions. 417.3 Section 417.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS § 417.3 Corrective actions. (a) The written HACCP plan...
IMPACT web portal: oncology database integrating molecular profiles with actionable therapeutics.
Hintzsche, Jennifer D; Yoo, Minjae; Kim, Jihye; Amato, Carol M; Robinson, William A; Tan, Aik Choon
2018-04-20
With the advancement of next generation sequencing technology, researchers are now able to identify important variants and structural changes in DNA and RNA in cancer patient samples. With this information, we can now correlate specific variants and/or structural changes with actionable therapeutics known to inhibit these variants. We introduce the creation of the IMPACT Web Portal, a new online resource that connects molecular profiles of tumors to approved drugs, investigational therapeutics and pharmacogenetics associated drugs. IMPACT Web Portal contains a total of 776 drugs connected to 1326 target genes and 435 target variants, fusion, and copy number alterations. The online IMPACT Web Portal allows users to search for various genetic alterations and connects them to three levels of actionable therapeutics. The results are categorized into 3 levels: Level 1 contains approved drugs separated into two groups; Level 1A contains approved drugs with variant specific information while Level 1B contains approved drugs with gene level information. Level 2 contains drugs currently in oncology clinical trials. Level 3 provides pharmacogenetic associations between approved drugs and genes. IMPACT Web Portal allows for sequencing data to be linked to actionable therapeutics for translational and drug repurposing research. The IMPACT Web Portal online resource allows users to query genes and variants to approved and investigational drugs. We envision that this resource will be a valuable database for personalized medicine and drug repurposing. IMPACT Web Portal is freely available for non-commercial use at http://tanlab.ucdenver.edu/IMPACT .
46 CFR 161.006-6 - Procedure for approval.
Code of Federal Regulations, 2010 CFR
2010-10-01
... satisfactory or what corrections appear necessary and then he may proceed with the construction of the pre-approval sample in accordance therewith. The pre-approval sample, together with four copies of the plans... Commander of the Coast Guard District in which the factory is located for inspection and tests. The cost of...
40 CFR 80.1622 - Approval for small refiner and small volume refinery status.
Code of Federal Regulations, 2014 CFR
2014-07-01
... appropriate data to correct the record when the company submits its application. (ii) Foreign small refiners... 40 Protection of Environment 17 2014-07-01 2014-07-01 false Approval for small refiner and small... Approval for small refiner and small volume refinery status. (a) Applications for small refiner or small...
DOE Office of Scientific and Technical Information (OSTI.GOV)
DiSalvo, Rick; Surovchak, Scott; Spreng, Carl
2013-07-01
Cleanup and closure of DOE's Rocky Flats Site in Colorado, which was placed on the CERCLA National Priority List in 1989, was accomplished under CERCLA, RCRA, and the Colorado Hazardous Waste Act (CHWA). The physical cleanup work was completed in late 2005 and all buildings and other structures that composed the Rocky Flats industrial complex were removed from the surface, but remnants remain in the subsurface. Other remaining features include two landfills closed in place with covers, four groundwater treatment systems, and surface water and groundwater monitoring systems. Under the 2006 Corrective Action Decision/Record of Decision for Rocky Flats Plantmore » (US DOE) Peripheral Operable Unit and the Central Operable Unit (CAD/ROD), the response actions selected for the Central Operable Unit (OU) are institutional controls (ICs), physical controls, and continued monitoring and maintenance. The objectives of these ICs were to prevent unacceptable exposure to remaining subsurface contamination and to prevent contaminants from mobilizing to surface water and to prevent interfering with the proper functioning of the engineered components of the remedy. An amendment in 2011 of the 2006 CAD/ROD clarified the ICs to prevent misinterpretation that would prohibit work to manage and maintain the Central OU property. The 2011 amendment incorporated a protocol for a Soil Disturbance Review Plan for work subject to ICs that requires approval from the State and public notification by DOE prior to conducting approved soil-disturbing work. (authors)« less
7 CFR 1730.25 - Corrective action.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Corrective action. 1730.25 Section 1730.25... AGRICULTURE ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.25 Corrective action. (a) For any items on the RUS Form 300 rated unsatisfactory (i.e., 0 or 1) by the borrower...
40 CFR 264.101 - Corrective action for solid waste management units.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., storage or disposal of hazardous waste must institute corrective action as necessary to protect human... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Corrective action for solid waste... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE...
40 CFR 264.101 - Corrective action for solid waste management units.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., storage or disposal of hazardous waste must institute corrective action as necessary to protect human... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Corrective action for solid waste... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE...
40 CFR 264.101 - Corrective action for solid waste management units.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., storage or disposal of hazardous waste must institute corrective action as necessary to protect human... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Corrective action for solid waste... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE...
40 CFR 264.101 - Corrective action for solid waste management units.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Corrective action for solid waste... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Releases From Solid Waste Management Units § 264.101 Corrective action for...
40 CFR 264.101 - Corrective action for solid waste management units.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Corrective action for solid waste... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Releases From Solid Waste Management Units § 264.101 Corrective action for...
Eighteen- and 24-Month-Old Infants Correct Others in Anticipation of Action Mistakes
ERIC Educational Resources Information Center
Knudsen, Birgit; Liszkowski, Ulf
2012-01-01
Much of human communication and collaboration is predicated on making predictions about others' actions. Humans frequently use predictions about others' action mistakes to correct others and spare them mistakes. Such anticipatory correcting reveals a social motivation for unsolicited helping. Cognitively, it requires forward inferences about…
40 CFR 257.28 - Implementation of the corrective action program.
Code of Federal Regulations, 2012 CFR
2012-07-01
...-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28 Implementation of the... ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action remedy; and (iii...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bechtel Nevada
1998-09-30
This corrective action plan proposes the closure method for the area 9 unexploded Ordnance landfill, corrective action unit 453 located at the Tonopah Test Range. The area 9 UXO landfill consists of corrective action site no. 09-55-001-0952 and is comprised of three individual landfill cells designated as A9-1, A9-2, and A9-3. The three landfill cells received wastes from daily operations at area 9 and from range cleanups which were performed after weapons testing. Cell locations and contents were not well documented due to the unregulated disposal practices commonly associated with early landfill operations. However, site process knowledge indicates that themore » landfill cells were used for solid waste disposal, including disposal of UXO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss
2011-09-01
The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclearmore » explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical knowledge of the CASs were sufficient to meet the DQOs and evaluate CAAs without additional investigation. As a result, further investigation of the CAU 547 CASs was not required. The following CAAs were identified for the gas sampling assemblies: (1) clean closure, (2) closure in place, (3) modified closure in place, (4) no further action (with administrative controls), and (5) no further action. Based on the CAAs evaluation, the recommended corrective action for the three CASs in CAU 547 is closure in place. This corrective action will involve construction of a soil cover on top of the gas sampling assembly components and establishment of use restrictions at each site. The closure in place alternative was selected as the best and most appropriate corrective action for the CASs at CAU 547 based on the following factors: (1) Provides long-term protection of human health and the environment; (2) Minimizes short-term risk to site workers in implementing corrective action; (3) Is easily implemented using existing technology; (4) Complies with regulatory requirements; (5) Fulfills FFACO requirements for site closure; (6) Does not generate transuranic waste requiring offsite disposal; (7) Is consistent with anticipated future land use of the areas (i.e., testing and support activities); and (8) Is consistent with other NNSS site closures where contamination was left in place.« less
5 CFR 735.103 - What other regulations pertain to employee conduct?
Code of Federal Regulations, 2010 CFR
2010-01-01
... employee's violation of those regulations may cause the employee's agency to take disciplinary action, or corrective action as that term is used in 5 CFR part 2635. Such disciplinary action or corrective action may...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-20
... (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of four Kansas State Implementation Plan... of proposed rulemaking for this action, which was published on April 17, 2013. DATES: This rule will... those portions in the April 17, 2013, proposed rule since they had already been acted upon by EPA. With...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-23
... global warming, through regulations that will harm the economy of the United States,'' and asserts that EPA is attempting to take such action on the issue of global warming which Congress has ``decided that... purpose of addressing global warming. IV. Final Action EPA is approving Pennsylvania's adoption of the CTG...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Application for acceptance for production inspections and tests: Coast Guard action. 159.007-7 Section 159.007-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Production Inspection...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Application for acceptance for production inspections and tests: Coast Guard action. 159.007-7 Section 159.007-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Production Inspection...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-10
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R08-OAR-2009-0790; FRL-9114-3] Approval and...: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action..., Environmental Protection Agency (EPA), Region 8, Mailcode 8P-AR, 1595 Wynkoop Street, Denver, Colorado 80202...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... action on the revision to APEN exemption II.D.1.uuu., because we proposed approval of the revision in the....uuu; II.D.1.eeee. No Action--Un-Revised Provisions.. II.B; II.B.1.a; II.B.3.b; II.B.4; II.B.5; II.B.6...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) weremore » evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material—including lead plates, lead bricks, and lead-shielded cables—was removed during the investigation and requires no additional corrective action.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
...). ACTION: Final rule. SUMMARY: EPA is finalizing approval of California's Airborne Toxic Control Measure... (75 FR 61662), EPA proposed to approve California's Airborne Toxic Control Measure for Emissions of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-10
...-regulatory and quasi-regulatory portions of the Oregon SIP. DATES: This action is effective January 9, 2014.... EPA-approved source-specific permits. 5. EPA-approved nonregulatory and quasi-regulatory provisions...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
...Through this interim final rule, NMFS announces that it partially approves Framework Adjustment 48 to the NE Multispecies Fishery Management Plan (FMP) and implements the approved measures in the regulations. Framework 48 is the first of two parallel and related actions developed by the New England Fishery Management Council (Council) to respond to updated stock status information and to adjust other management measures in the NE multispecies (groundfish) fishery beginning in fishing year (FY) 2013. This action implements new status determination criteria for Gulf of Maine (GOM) cod, Georges Bank (GB) cod, Southern New England/Mid-Atlantic (SNE/MA) yellowtail flounder, and white hake based on new benchmark assessments completed for these stocks in 2012 and 2013. NMFS is approving and implementing updated status determination criteria for white hake through this interim final rule and accepting further comment on this measure since it was not available for comment in the Framework 48 proposed rule. NMFS will publish a subsequent final rule to respond to any comments received, if necessary. Through this action, NMFS has also approved and is implementing the following Framework 48 measures: Elimination of dockside monitoring requirements for the groundfish fishery; lower minimum fish sizes for several groundfish stocks; clarified goals and performance standard for groundfish monitoring programs; revisions to the allocation of GB yellowtail flounder to the scallop fishery; and establishment of sub-annual catch limits (ACLs) of GB yellowtail flounder and SNE/MA windowpane flounder for the scallop and other non- groundfish fisheries. NMFS also approved revisions to recreational and commercial accountability measures (AMs), including amendments to existing AMs for windowpane flounder, ocean pout, and Atlantic halibut, and new ``reactive'' AMs for Atlantic wolffish and SNE/MA winter flounder, to address a remand by the U.S. District Court of Appeals. NMFS disapproved some measures in Framework 48: A provision for cost- sharing of monitoring costs between the industry and NMFS; a provision to delay industry-funded monitoring to FY 2014; finer scale discard rate strata for GB yellowtail flounder; and a provision to remove requirements for groundfish trawlers to stow their gear when transiting closed areas. Through this interim final rule, NMFS also withdraws a proposed correction to the regulations specific to monitoring of the Eastern U.S./Canada quotas, and will be accepting additional public comment on this issue. These measures are necessary to meet the requirements of the FMP and the Magnuson-Stevens Act, most notably preventing overfishing, ensuring that management measures are based on the best available science, and mitigating, to the extent practicable, potential negative economic impacts from reductions in catch limits anticipated for fishing year FY 2013.
Quick Reaction Report on DoD Procurements Through the Tennessee Valley Authority
1992-04-03
from non-DoD agencies that includes sections to be completed and signed by a contracting officer. Recommendations for Corrective Actions We recommend...in the DD 350 Individual Contract Action Reporting System. The Assistant Secretary did not provide planned dates for completing the corrective actions ...will be reprocured. Tentative milestones for completion of the corrective actions were not identified. Defense Logistics Agency comments. The Deputy
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-18
... Approval and Disapproval of Air Quality Implementation Plans; Nevada; Clark County; Stationary Source... limited approval and limited disapproval of revisions to the Clark County portion of the applicable state... limited approval and limited disapproval action is to update the applicable SIP with current Clark County...
78 FR 29780 - Fees for Testing, Evaluation, and Approval of Mining Products
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-21
... Approval of Mining Products AGENCY: Mine Safety and Health Administration, Labor. ACTION: Notice. SUMMARY..., and approval of mining products; it allows MSHA to collect fees up to $2,499,000 for the testing, evaluation, and approval of certain mining equipment. MSHA is continuing to collect these fees for 2013 as...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-07
... Inspection Service [Docket No. APHIS-2013-0092] Notice of Request for Extension of Approval of an Information... Inspection Service, USDA. ACTION: Extension of approval of an information collection; comment request... Plant Health Inspection Service's intention to request an extension of approval of an information...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-19
...-Approval of OMNI Hydrocarbon Measurement, Inc. as a Commercial Gauger AGENCY: Bureau of Customs and Border Protection, Department of Homeland Security. ACTION: Notice of re-approval of Omni Hydrocarbon Measurement... 151.13, Omni Hydrocarbon Measurement, Inc., Crosby, Texas 77532, has been re- approved to gauge...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-24
...] Notice of Request for Extension of Approval of an Information Collection; Communicable Diseases in Horses AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Extension of approval of an information... announces the Animal and Plant Health Inspection Service's intention to request an extension of approval of...
10 CFR 26.41 - Audits and corrective action.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Audits and corrective action. 26.41 Section 26.41 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Program Elements § 26.41 Audits and corrective action. (a) General. Each licensee and other entity who is subject to this subpart is responsible for the...
10 CFR 26.41 - Audits and corrective action.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Audits and corrective action. 26.41 Section 26.41 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Program Elements § 26.41 Audits and corrective action. (a) General. Each licensee and other entity who is subject to this subpart is responsible for the...
10 CFR 26.41 - Audits and corrective action.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Audits and corrective action. 26.41 Section 26.41 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Program Elements § 26.41 Audits and corrective action. (a) General. Each licensee and other entity who is subject to this subpart is responsible for the...
10 CFR 26.41 - Audits and corrective action.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Audits and corrective action. 26.41 Section 26.41 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Program Elements § 26.41 Audits and corrective action. (a) General. Each licensee and other entity who is subject to this subpart is responsible for the...
10 CFR 26.41 - Audits and corrective action.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Audits and corrective action. 26.41 Section 26.41 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Program Elements § 26.41 Audits and corrective action. (a) General. Each licensee and other entity who is subject to this subpart is responsible for the...
Corrective Action Framework for the Office of Student Financial Assistance.
ERIC Educational Resources Information Center
Advanced Technology, Inc., Reston, VA.
An ongoing corrective action framework for the Office of Student Financial Assistance (OSFA) is presented. Attention is directed to the formal management structure in OSFA and current initiatives to improve management, and the placement of the corrective action process in the organizational hierarchy. Four formal mechanisms needed to implement the…
77 FR 74024 - Sunshine Act Meetings; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-12
... INTER-AMERICAN FOUNDATION BOARD MEETING Sunshine Act Meetings; Correction AGENCY: Inter-American Foundation. ACTION: Correction. SUMMARY: This action corrects the order of the MATTERS TO BE CONSIDERED and... September 24, 2012, Meeting of the Board of Directors'' subsections. CONTACT PERSON FOR MORE INFORMATION...
DOE Office of Scientific and Technical Information (OSTI.GOV)
R. B. Jackson
2003-05-01
The Areas 25, 26 and 27 Septic Systems are in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Corrective Action Unit (CAU) 271. This Corrective Action Plan (CAP) provides selected corrective action alternatives and proposes the closure methodology for CAU 271. CAU 271 is located on the Nevada Test Site (NTS) approximately 105 kilometers (65 miles) northwest of Las Vegas, Nevada, and consists of the following 15 Corrective Action Sites (CAS): CAS 25-04-1, Septic System; CAS 25-04-03, Septic System; CAS25-04-04, Septic System; CAS 25-04-08, Septic System; CAS 25-04-09, Septic System; CAS 25-04-10, Septic System; CAS 25-04-11, Septicmore » System; CAS 26-03-01, Contaminated Water Reservoir; CAS 26-04-1, Septic System; CAS 26-04-02, Septic System; CAS 26-05-01, Radioactive Leachfield; CAS-26-05-03, Septic System; CAS 26-05-04, Septic System; CAS 26-05-05, Septic System; and CAS 27-05-02, Leachfield.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
The module discusses the regulatory and statutory requirements and authorities governing the Resource Conservation and Recovery Act (RCRA) corrective action process. There are minimal regulatory requirements at present, but the Agency has issued a proposed rule (55 FR 30798; July 27, 1990) that would establish a comprehensive regulatory framework for implementing the corrective action program. This proposed rule and other guidance developed pursuant to statutory authorities are used to structure corrective action requirements in facility permits and orders. This module describes the current statutory and regulatory structure and discusses the future of the proposed rule.
Cleanups In My Community (CIMC) - Hazardous Waste Corrective Actions, National Layer
This data layer provides access to Hazardous Waste Corrective Action sites as part of the CIMC web service. Hazardous waste is waste that is dangerous or potentially harmful to our health or the environment. Hazardous wastes can be liquids, solids, gases, or sludges. They can be discarded commercial products, like cleaning fluids or pesticides, or the by-products of manufacturing processes. The RCRA Corrective Action Program, run by EPA and 43 authorized states and territories, works with facilities that have treated, stored, or disposed of hazardous wastes (TSDs) to protect public health and the environment by investigating and cleaning up hazardous releases to soil, ground water, surface water, and air at their facilities.RCRA Corrective Action sites in all 50 states and four U.S. territories cover 18 million acres of land.EPA estimates that more than 35 million people, roughly 12 percent of the U.S. population, live within one mile of a RCRA Corrective Action site (based on the 2000 U.S. Census).RCRA Corrective Action facilities include many current and former chemical manufacturing plants, oil refineries, lead smelters, wood preservers, steel mills, commercial landfills, and a variety of other types of entities. Due to poor practices prior to environmental regulations, Corrective Action facilities have left large stretches of river sediments laden with PCBs; deposited lead in residential yards and parks beyond site boundaries; polluted drinking water wells
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-01
... action is EPA approving? B. Why is EPA approving this delisting? C. How will Beaumont Refinery manage the wastes, if it is delisted? D. When would the delisting exclusion be finalized? E. How would this action... petition? D. What were the results of Beaumont Refinery's analysis? E. How did EPA evaluate the risk of...
36 CFR 1280.34 - What are the types of corrective action NARA imposes for prohibited behavior?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false What are the types of corrective action NARA imposes for prohibited behavior? 1280.34 Section 1280.34 Parks, Forests, and Public... corrective action NARA imposes for prohibited behavior? (a) Individuals who violate the provisions of this...
36 CFR 1280.34 - What are the types of corrective action NARA imposes for prohibited behavior?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false What are the types of corrective action NARA imposes for prohibited behavior? 1280.34 Section 1280.34 Parks, Forests, and Public... corrective action NARA imposes for prohibited behavior? (a) Individuals who violate the provisions of this...
36 CFR 1280.34 - What are the types of corrective action NARA imposes for prohibited behavior?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false What are the types of corrective action NARA imposes for prohibited behavior? 1280.34 Section 1280.34 Parks, Forests, and Public... corrective action NARA imposes for prohibited behavior? (a) Individuals who violate the provisions of this...
36 CFR 1280.34 - What are the types of corrective action NARA imposes for prohibited behavior?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false What are the types of corrective action NARA imposes for prohibited behavior? 1280.34 Section 1280.34 Parks, Forests, and Public... corrective action NARA imposes for prohibited behavior? (a) Individuals who violate the provisions of this...
ERIC Educational Resources Information Center
Stewart, Francine A.
2016-01-01
The purpose of this study was to find out which corrective actions have a positive impact on improving students' learning and achievement and ultimately moving underperforming elementary schools out of Program Improvement (PI) status in California. Some common corrective actions include, but are not limited to, instructional program, instructional…
77 FR 15841 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-16
... PFC approvals and disapprovals under the provisions of the Aviation Safety and Capacity Expansion Act... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Monthly...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-19
... MERIT SYSTEMS PROTECTION BOARD Agency Information Collection Activities; Emergency Reinstatement of Previously Approved Collection AGENCY: Merit Systems Protection Board. ACTION: Notice of emergency reinstatement. SUMMARY: The Merit Systems Protection Board (MSPB) is requesting approval from the Office of...
77 FR 47544 - Approval of Classification Societies
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
...-AB35 Approval of Classification Societies AGENCY: Coast Guard, DHS. ACTION: Final rule. SUMMARY: Federal law requires that classification societies conducting certain work in the United States be... that classification societies must meet in order to obtain approval by the Coast Guard. Through this...
77 FR 48496 - Notice of Intent To Seek Approval To Collect Information
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-14
... DEPARTMENT OF AGRICULTURE National Agricultural Library Notice of Intent To Seek Approval To Collect Information AGENCY: National Agricultural Library, Agricultural Research Service, USDA. ACTION... Library's intent to request renewal of an approved electronic mailing list subscription form from those...
28 CFR 58.16 - Procedures for inclusion on the approved list.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Procedures for inclusion on the approved... RELATING TO THE BANKRUPTCY REFORM ACTS OF 1978 AND 1994 § 58.16 Procedures for inclusion on the approved... application will be denied, and no further action will be taken on the request for inclusion on the approved...
28 CFR 58.16 - Procedures for inclusion on the approved list.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Procedures for inclusion on the approved... RELATING TO THE BANKRUPTCY REFORM ACTS OF 1978 AND 1994 § 58.16 Procedures for inclusion on the approved... application will be denied, and no further action will be taken on the request for inclusion on the approved...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-12
...; Approval Procedures for Nontoxic Shot and Shot Coatings AGENCY: Fish and Wildlife Service, Interior. ACTION... Number: 1018-0067. Title: Approval Procedures for Nontoxic Shot and Shot Coatings, 50 CFR 20.134. Service... Respondents: Businesses that produce and/or market approved nontoxic shot types or nontoxic shot coatings...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and providemore » data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor and radium-226. A corrective action was implemented to remove approximately 50 cubic yards of PCB-contaminated soil, approximately 1 cubic foot of radium-226 contaminated soil (and scabbled asphalt), and a high-efficiency particulate air filter that was determined to meet the criteria of a potential source material (PSM). Electrical and lighting components (i.e., PCB-containing ballasts and capacitors) and other materials (e.g., mercury-containing thermostats and switches, lead plugs and bricks) assumed to be PSM were also removed from Building 2201, as practical, without the need for sampling. Because the COC contamination and PSMs have been removed, clean closure of CAS 26-41-01 is recommended, and no use restrictions are required to be placed on this CAU. No further action is necessary because no other contaminants of potential concern were found above preliminary action levels. The physical end state for Building 2201 is expected to be eventual demolition to slab. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Clean closure is the recommended corrective action for CAS 26-41-01 in CAU 117. • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 117. • Corrective Action Unit 117 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
ITLV.
1999-03-01
The Corrective Action Investigation Plan for Corrective Action Unit 428, Area 3 Septic Waste Systems 1 and 5, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U. S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 428 consists of Corrective Action Sites 03- 05- 002- SW01 and 03- 05- 002- SW05, respectively known as Area 3 Septic Waste System 1 and Septic Waste System 5. This Corrective Action Investigation Plan is used inmore » combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada , Rev. 1 (DOE/ NV, 1998c). The Leachfield Work Plan was developed to streamline investigations at leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 428. A system of leachfields and associated collection systems was used for wastewater disposal at Area 3 of the Tonopah Test Range until a consolidated sewer system was installed in 1990 to replace the discrete septic waste systems. Operations within various buildings at Area 3 generated sanitary and industrial wastewaters potentially contaminated with contaminants of potential concern and disposed of in septic tanks and leachfields. Corrective Action Unit 428 is composed of two leachfield systems in the northern portion of Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include oil/ diesel range total petroleum hydrocarbons, and Resource Conservation and Recovery Act characteristic volatile organic compounds, semivolatile organic compounds, and metals. A limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from four of the septic tanks and if radiological field screening levels are exceeded. Additional samples will be analyzed for geotechnical and hydrological properties and a bioassessment may be performed. The technical approach for investigating this Corrective Action Unit consists of the following activities: Perform video surveys of the discharge and outfall lines. Collect samples of material in the septic tanks. Conduct exploratory trenching to locate and inspect subsurface components. Collect subsurface soil samples in areas of the collection system including the septic tanks and outfall end of distribution boxes. Collect subsurface soil samples underlying the leachfield distribution pipes via trenching. Collect surface and near- surface samples near potential locations of the Acid Sewer Outfall if Septic Waste System 5 Leachfield cannot be located. Field screen samples for volatile organic compounds, total petroleum hydrocarbons, and radiological activity. Drill boreholes and collect subsurface soil samples if required. Analyze samples for total volatile organic compounds, total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and total petroleum hydrocarbons (oil/ diesel range organics). Limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from particular septic tanks and if radiological field screening levels are exceeded. Collect samples from native soils beneath the distribution system and analyze for geotechnical/ hydrologic parameters. Collect and analyze bioassessment samples at the discretion of the Site Supervisor if total petroleum hydrocarbons exceed field- screening levels.« less
NASA Technical Reports Server (NTRS)
Burcham, Michael S.; Daprato, Rebecca C.
2016-01-01
This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.
Handbook: Collecting Groundwater Samples from Monitoring Wells in Frenchman Flat, CAU 98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chapman, Jenny; Lyles, Brad; Cooper, Clay
Frenchman Flat basin on the Nevada National Security Site (NNSS) contains Corrective Action Unit (CAU) 98, which is comprised of ten underground nuclear test locations. Environmental management of these test locations is part of the Underground Test Area (UGTA) Activity conducted by the U.S. Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended) with the U.S. Department of Defense (DOD) and the State of Nevada. A Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been approved for CAU 98 (DOE, 2011). The CADD/CAP reports on the Corrective Action Investigation that was conductedmore » for the CAU, which included characterization and modeling. It also presents the recommended corrective actions to address the objective of protecting human health and the environment. The recommended corrective action alternative is “Closure in Place with Modeling, Monitoring, and Institutional Controls.” The role of monitoring is to verify that Contaminants of Concern (COCs) have not exceeded the Safe Drinking Water Act (SDWA) limits (Code of Federal Regulations, 2014) at the regulatory boundary, to ensure that institutional controls are adequate, and to monitor for changed conditions that could affect the closure conditions. The long-term closure monitoring program will be planned and implemented as part of the Closure Report stage after activities specified in the CADD/CAP are complete. Groundwater at the NNSS has been monitored for decades through a variety of programs. Current activities were recently consolidated in an NNSS Integrated Sampling Plan (DOE, 2014). Although monitoring directed by the plan is not intended to meet the FFACO long-term monitoring requirements for a CAU (which will be defined in the Closure Report), the objective to ensure public health protection is similar. It is expected that data collected in accordance with the plan will support the transition to long-term monitoring at each CAU. The sampling plan is designed to ensure that monitoring activities occur in compliance with the UGTA Quality Assurance Plan (DOE, 2012). The sampling plan should be referenced for Quality Assurance (QA) elements and procedures governing sampling activities. The NNSS Integrated Sampling Plan specifies the groundwater monitoring that will occur in CAU 98 until the long-term monitoring program is approved in the Closure Report. The plan specifies the wells that must be monitored and categorizes them by their sampling objective with the associated analytical requirements and frequency. Possible sample collection methods and required standard operating procedures are also presented. The intent of this handbook is to augment the NNSS Integrated Sampling Plan by providing well-specific details for the sampling professional implementing the Sampling Plan in CAU 98, Frenchman Flat. This handbook includes each CAU 98 well designated for sampling in the NNSS Integrated Sampling Plan. The following information is provided in the individual well sections: 1. The purpose of sampling. 2. A physical description of the well. 3. The chemical characteristics of the formation water. 4. Recommended protocols for purging and sampling. The well-specific information has been gathered from numerous historical and current sources cited in each section, but two particularly valuable resources merit special mention. These are the USGS NNSS website (http://nevada.usgs.gov/doe_nv/ntsarea5.cfm) and the UGTA Field Operations website (https://ugta.nv.doe.gov/sites/Field%20Operations/default.aspx). 2 Land surface elevation and measuring point for water level measurements in Frenchman Flat were a focus during CAU investigations (see Appendix B, Attachment 1 in Navarro-Intera, 2014). Both websites listed above provide information on the accepted datum for each well. A summary is found on the home page for the well on the USGS website. Additional information is available through a link in the “Available Data” section to an “MP diagram” with a photo annotated with the datum information. On the UGTA Field Operations well page, the same information is in the “Wellhead Diagram” link. Well RNM-2s does not have an annotated photo at this time. All of the CAU 98 monitoring wells are located within Area 5 of Frenchman Flat, with the exception of ER-11-2 in Area 11 (Figure 1). The wells are clustered in two areas: the northern area (Figure 2) and the central area (Figure 3). Each well is discussed below in geographic order from north to south as follows: ER-11-2, ER-5-3 shallow piezometer, ER-5-3-2, ER-5-5, RNM-1, RNM-2s, and UE-5n.« less
76 FR 16533 - Certain Other Dosage Form New Animal Drugs; Detomidine; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-24
.... FDA-2010-N-0002] Certain Other Dosage Form New Animal Drugs; Detomidine; Correction AGENCY: Food and... paragraph describing limitations to the approved conditions of use for detomidine hydrochloride oromucosal... conditions of use for detomidine hydrochloride oromucosal gel in horses. This correction is being made to...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NNSA /NV
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 140 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 140 consists of nine Corrective Action Sites (CASs): 05-08-01, Detonation Pits; 05-08-02, Debris Pits; 05-17-01, Hazardous Waste Accumulation Site (Buried); 05-19-01, Waste Disposal Site; 05-23-01, Gravel Gertie; 05-35-01, Burn Pit; 05-99-04, Burn Pit; 22-99-04, Radioactive Waste Dump; 23-17-01, Hazardous Waste Storage Area. All nine of these CASs are located withinmore » Areas 5, 22, and 23 of the Nevada Test Site (NTS) in Nevada, approximately 65 miles northwest of Las Vegas. This CAU is being investigated because disposed waste may be present without appropriate controls (i.e., use restrictions, adequate cover) and hazardous and/or radioactive constituents may be present or migrating at concentrations and locations that could potentially pose a threat to human health and the environment. The NTS has been used for various research and development projects including nuclear weapons testing. The CASs in CAU 140 were used for testing, material storage, waste storage, and waste disposal. A two-phase approach has been selected to collect information and generate data to satisfy needed resolution criteria and resolve the decision statements. Phase I will determine if contaminants of potential concern (COPCs) are present in concentrations exceeding preliminary action levels. This data will be evaluated at all CASs. Phase II will determine the extent of the contaminant(s) of concern (COCs). This data will only be evaluated for CASs with a COC identified during Phase I. Based on process knowledge, the COPCs for CAU 140 include volatile organics, semivolatile organics, petroleum hydrocarbons, explosive residues, herbicides, pesticides, polychlorinated biphenyls, metals, and radionuclides. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cabble, Kevin J.; Boehlecke, Robert F.
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 415: Project 57 No. 1 Plutonium Dispersion, which is located on Range 4808A of the Nevada Test and Training Range (NTTR). This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. CAU 415 comprises one corrective action site (CAS): NAFR-23-02, Pu Contaminated Soil. The purpose of this CR is to provide justification and documentation supporting the recommendationmore » that no further corrective action is needed for CAU 415 based on the implementation of the corrective action of Closure in Place.« less
NASA Astrophysics Data System (ADS)
Mallari, Lawrence Anthony Castro
This project proposes a manual specifically for remedying an ineffective Corrective Action Request System for Company ABC by providing dispositions within the company's quality procedure. A Corrective Action Request System is a corrective action tool that provides a means for employees to engage in the process improvement, problem elimination cycle. At Company ABC, Corrective Action Recommendations (CARs) are not provided with timely dispositions; CARs are being ignored due to a lack of training and awareness of Company ABC's personnel and quality procedures. In this project, Company ABC's quality management software database is scrutinized to identify the number of delinquent, non-dispositioned CARs in 2014. These CARs are correlated with the number of nonconformances generated for the same issue while the CAR is still open. Using secondary data, the primary investigator finds that nonconformances are being remediated at the operational level. However, at the administrative level, CARS are being ignored and forgotten.
78 FR 63903 - Airworthiness Directives; the Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-25
... Airplanes AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed rulemaking (NPRM... corrective actions if necessary. This proposed AD also specifies an optional action of doing an inspection for corrosion damage of the bonding brackets, and corrective actions if necessary, which would...
DOE Office of Scientific and Technical Information (OSTI.GOV)
K. B. Campbell
The following site closure activities were performed at the 34 Corrective Action Sites (CASs) comprising Corrective Action Unit (CAU) 417 and are documented in this report: (1) No closure action was taken at 13 CASs (17 sites): 58-05-01,58-07-01,58-05-04, 58-09-05 (Mud Pits C and D only), 58-35-01,58-05-02,58-09-06 (Mud Pits A, B, C, and D), 58-10-06,58-19-01,58-35-02,58-44-04,58-05-04, and 58-09-03 (Mud Pit E only). (2) Housekeeping activities, collecting scrap materials, and transporting to approved landfill sites at the NTS were used to close seven CASs: 58-44-01,58-44-02,58-44-05, 58-98-03,58-98-01,58-98-02, and 58-98-04. (3) Two CASs (58-05-03 and 58-99-01) were closed by excavation and removal of USTs. (4)more » Two septic tanks (CASs 58-05-05 and 58-05-06) were closed by backfilling with clean fill. (5) Site posting with above-grade monuments and attached warning signs and land-use restrictions were used to close seven CASs (nine sites): 58-09-02,58-09-05 (Mud Pit E only), 58-09-06 (Mud Pit E only), 58-10-01,58-25-01,58-09-03 (Mud Pits A, B, and D), and 58-10-05. (6) Clean closure by excavation soil with TPH levels greater than the NDEP action level of 100 mg/kg and limited regrading was used to close five CASs: 58-10-03,58-44-06, 58-44-03,58-10-02, and 58-10-04. (7) Construction of engineered covers was used to close in place two CASs: 58-09-01 and 58-09-03 (Mud Pit C only). Following construction, a fence was constructed around each cover to prevent damage to the cover or intrusion by wildlife.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-10
...EPA is approving those revisions adopted by the State of Colorado on April 16, 2004 to Regulation No. 3 (Stationary Source Permitting and Air Pollutant Emission Notice Requirements) that incorporate EPA's December 31, 2002 NSR Reforms. Colorado submitted the request for approval of these rule revisions into the State Implementation Plan (SIP) on July 11, 2005 and supplemented its request on October 25, 2005. EPA is approving only the portions of Colorado's revisions to Regulation Number 3 that relate to the prevention of significant deterioration (PSD) and non-attainment new source review (NSR) construction permit programs of the State of Colorado. Other revisions, renumberings, additions, or deletions to Regulation No. 3 made by Colorado as part of the April 16, 2004 final rulemaking are being acted on by EPA in a separate final action related to Colorado's Interstate Transport SIP (see proposed action at 76 FR 21835, April 19, 2011). Colorado has a federally approved NSR program for new and modified sources impacting attainment and non-attainment areas in the State. This action is being taken under section 110 of the Clean Air Act (CAA).
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall be...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall be...
Mol, Peter G M; Straus, Sabine M J M; Piening, Sigrid; de Vries, Jonie T N; de Graeff, Pieter A; Haaijer-Ruskamp, Flora M
2010-06-01
As pre-approval trials are inherently limited in assessing the complete benefit-risk profile of a new drug, serious safety issues may emerge once a drug gains widespread use after approval. Regulators face the dilemma of balancing timely market access with the need for complete data on risks. This challenge has led to a life-cycle approach but, so far, few data are available on post-approval safety issues requiring regulatory action. The aim of this study is to determine the frequency, timing and nature of safety issues that necessitated safety-related regulatory action in the form of a Direct Healthcare Professional Communication (DHPC) issued by pharmaceutical companies in collaboration with the Dutch Medicines Evaluation Board during the past decade. All DHPCs issued in the Netherlands from 1 January 1999 to 1 January 2009 were retrospectively collected from the national regulatory authorities. Elapsed time between the approval date and the issue of the DHPC was determined. Characteristics of the action including the nature of the safety issue (according to Medical Dictionary for Regulatory Activities [MedDRA] terminology), type of drug and procedural aspects of the regulatory action taken were reviewed. DHPC characteristics were tabulated and explorative non-parametric tests were performed to study the effect of safety issue, drug class, drug type, orphan drug and first-in-class status on elapsed time from approval to the DHPC. 157 DHPCs were issued concerning 112 different active substances, approximately 9% (112/1200) of active substances available in the Netherlands in 2007. The number of DHPCs issued increased by 2.1 (95% CI 1.2, 3.1; p < 0.001) DHPCs per year over the past decade, reaching a total of 25 in 2008. The median time between approval and DHPC was 5.3 years (range 0.13-48 years). No significant trend in elapsed time to DHPC was observed in relation to the studied years (p = 0.06). One-third of all DHPCs were issued in the first 3 years after approval, but 27% (n = 43/157) of the DHPCs were issued 10 or more years after approval. Timing of DHPCs differed depending on safety issue, drug class, drug type and orphan drug status. DHPCs mostly concerned adverse events in the system organ class of 'cardiac disorders' (15%), 'injury, poisoning and procedural complications' (13%) and 'general disorders and administration site conditions' (10%). In ten cases the drug was eventually withdrawn. Withdrawal occurred a median duration of 2.4 years after registration (range of 1.5-48 years) and was most frequently due to cardiac disorders (including QT interval prolongation; four occasions) and hepatobiliary disorders (two occasions). In the past decade, the number of DHPCs has increased over time. This is likely caused by a multitude of factors: increased risk awareness by the public, media, regulators and other stakeholders; the type of drugs approved, such as orphan drugs and biologicals; and the regulatory process, including conditional approvals. The number of DHPCs may in the future increase further with the possibility of screening large epidemiological databases proactively for adverse drug events. Nine percent of all marketed drugs required a safety-related action. Regulatory action is taken shortly (<3 years) after market approval nearly as often as after intermediate (3-10 years) and long-term (>10 years) market exposure. These findings underline the need for risk management during the whole life cycle of a drug.
78 FR 65982 - Information Collection Approved by the Office of Management and Budget (OMB)
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-04
... FEDERAL COMMUNICATIONS COMMISSION Information Collection Approved by the Office of Management and Budget (OMB) AGENCY: Federal Communications Commission. ACTION: Notice. SUMMARY: The Federal Communications Commission (FCC) has received Office of Management and Budget (OMB) approval for the following...
77 FR 46760 - Information Collections Approved by the Office of Management and Budget
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-06
... Budget AGENCY: Federal Communications Commission. ACTION: Notice of public information collection approved by the Office of Management and Budget. SUMMARY: The Federal Communications Commission has received the Office of Management and Budget (OMB) approval for the following public information collection...
78 FR 55238 - Notice of Request for New Approval of Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-10
... Agricultural Service (FAS) intends to request the approval of a new information collection process involving... DEPARTMENT OF AGRICULTURE Foreign Agricultural Service Notice of Request for New Approval of Information Collection AGENCY: Foreign Agricultural Service, USDA. ACTION: Notice and request for comments...
78 FR 33893 - Proposed Collection; Comment Request for Form 5306-A
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-05
... Form 5306-A, Application for Approval of Prototype Simplified Employee Pension (SEP) or [email protected] . SUPPLEMENTARY INFORMATION: Title: Application for Approval of Prototype Simplified Employee... to determine if the prototype plan submitted is an approved plan. Current Actions: There are no...
75 FR 44756 - Notice of Request for Revision of a Currently Approved Collection.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-29
... DEPARTMENT OF AGRICULTURE Risk Management Agency Notice of Request for Revision of a Currently Approved Collection. AGENCY: Risk Management Agency, USDA. ACTION: Revision of a Currently Approved...: [email protected] . FOR FURTHER INFORMATION CONTACT: David L. Miller, Director, Risk Management...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-16
... clause at FAR 52.244-2, Subcontracts. (1) Unallowability of costs of rework and corrective action. A new... cost of rework or corrective action that may be required to remedy the use or inclusion of such parts... such products and for any rework or corrective action that may be required to remedy the use or...
36 CFR § 1280.34 - What are the types of corrective action NARA imposes for prohibited behavior?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true What are the types of corrective action NARA imposes for prohibited behavior? § 1280.34 Section § 1280.34 Parks, Forests, and... of corrective action NARA imposes for prohibited behavior? (a) Individuals who violate the provisions...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-07-01
Corrective Action Unit 106 comprises the four corrective action sites (CASs) listed below: • 05-20-02, Evaporation Pond • 05-23-05, Atmospheric Test Site - Able • 05-45-04, 306 GZ Rad Contaminated Area • 05-45-05, 307 GZ Rad Contaminated Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viablemore » CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 19, 2010, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 106. The presence and nature of contamination at CAU 106 will be evaluated based on information collected from a field investigation. The CAU includes land areas impacted by the release of radionuclides from groundwater pumping during the Radionuclide Migration study program (CAS 05-20-02), a weapons-related airdrop test (CAS 05-23-05), and unknown support activities at two sites (CAS 05-45-04 and CAS 05-45-05). The presence and nature of contamination from surface-deposited radiological contamination from CAS 05-23-05, Atmospheric Test Site - Able, and other types of releases (such as migration and excavation as well as any potential releases discovered during the investigation) from the remaining three CASs will be evaluated using soil samples collected from the locations most likely containing contamination, if present. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 106 includes the following activities: • Conduct radiological surveys. • Collect and submit environmental samples for laboratory analysis to determine internal dose rates and the presence of contaminants of concern. • If contaminants of concern are present, collect additional samples to define the extent of the contamination and determine the area where the total effective dose at the site exceeds final action levels (i.e., corrective action boundary). • Collect samples of investigation-derived waste, as needed, for waste management purposes.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
The purpose of this CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 568 based on the implementation of corrective actions. This includes a description of closure activities that were performed and an evaluation of the verification data. The CAP (NNSA/NFO, 2016a) and ROTC-1 (NNSA/NFO, 2016c) provide information relating to the selection of CAAs and the reasoning behind their selection. The CADD (NNSA/NFO, 2015) identifies the release sites that require additional corrective action and presents information supporting the selection of CAAs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jeremy Gwin and Douglas Frenette
This document contains the process knowledge, radiological data and subsequent statistical methodology and analysis to support approval for the radiological release of Corrective Action Unit (CAU) 117 – Pluto Disassembly Facility, Building 2201 located in Area 26 of the Nevada National Security Site (NNSS). Preparations for release of the building began in 2009 and followed the methodology described in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). MARSSIM is the DOE approved process for release of Real Property (buildings and landmasses) to a set of established criteria or authorized limits. The pre-approved authorized limits for surface contamination values andmore » corresponding assumptions were established by DOE O 5400.5. The release criteria coincide with the acceptance criteria of the U10C landfill permit. The U10C landfill is the proposed location to dispose of the radiologically non-impacted, or “clean,” building rubble following demolition. However, other disposition options that include the building and/or waste remaining at the NNSS may be considered providing that the same release limits apply. The Final Status Survey was designed following MARSSIM guidance by reviewing historical documentation and radiological survey data. Following this review a formal radiological characterization survey was performed in two phases. The characterization revealed multiple areas of residual radioactivity above the release criteria. These locations were remediated (decontaminated) and then the surface activity was verified to be less than the release criteria. Once remediation efforts had been successfully completed, a Final Status Survey Plan (10-015, “Final Status Survey Plan for Corrective Action Unit 117 – Pluto Disassembly Facility, Building 2201”) was developed and implemented to complete the final step in the MARSSIM process, the Final Status Survey. The Final Status Survey Plan consisted of categorizing each individual room into one of three categories: Class 1, Class 2 or Class 3 (a fourth category is a “Non-Impacted Class” which in the case of Building 2201 only pertained to exterior surfaces of the building.) The majority of the rooms were determined to fall in the less restrictive Class 3 category, however, Rooms 102, 104, 106, and 107 were identified as containing Class 1 and 2 areas. Building 2201 was divided into “survey units” and surveyed following the requirements of the Final Status Survey Plan for each particular class. As each survey unit was completed and documented, the survey results were evaluated. Each sample (static measurement) with units of counts per minute (cpm) was corrected for the appropriate background and converted to a value with units of dpm/100 cm2. With a surface contamination value in the appropriate units, it was compared to the surface contamination limits, or in this case the derived concentration guideline level (DCGLw). The appropriate statistical test (sign test) was then performed. If the survey unit was statistically determined to be below the DCGLw, then the survey unit passed and the null hypothesis (that the survey unit is above limits) was rejected. If the survey unit was equal to or below the critical value in the sign test, the null hypothesis was not rejected. This process was performed for all survey units within Building 2201. A total of thirty-three “Class 1,” four “Class 2,” and one “Class 3” survey units were developed, surveyed, and evaluated. All survey units successfully passed the statistical test. Building 2201 meets the release criteria commensurate with the Waste Acceptance Criteria (for radiological purposes) of the U10C landfill permit residing within NNSS boundaries. Based on the thorough statistical sampling and scanning of the building’s interior, Building 2201 may be considered radiologically “clean,” or free of contamination.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-04
...EPA is taking direct final action to approve State Implementation Plan (SIP) revisions submitted by the Maryland Department of the Environment (MDE) pertaining to the GenOn Chalk Point Generating Station (Chalk Point). These revisions approve specific provisions of a 2011 Consent Decree between MDE and GenOn to reduce particulate matter (PM), sulfur oxides (SOX), and nitrogen oxides (NOX) from Chalk Point. These revisions also remove the 1978 and 1979 Consent Orders for the Chalk Point generating station from the Maryland SIP as those Consent Orders have been superseded by the 2011 Consent Decree. EPA is approving these SIP revisions because the reductions of PM, SOX, and NOX are beneficial for reducing ambient levels of the PM, sulfur dioxide (SO2), nitrogen dioxide (NO2) and ozone. They also reduce visible emissions from Chalk Point. This action is being taken under the Clean Air Act (CAA).
24 CFR 3282.204 - IPIA services.
Code of Federal Regulations, 2010 CFR
2010-04-01
... DEVELOPMENT MANUFACTURED HOME PROCEDURAL AND ENFORCEMENT REGULATIONS Manufacturer Inspection and Certification... DAPIA approved design and the quality assurance manual for that plant, and the IPIA shall perform an... to conform with the DAPIA approved designs and manuals. After the corrections required by the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-17
... conditional approval of portions of OAC rule 3745-21-09. You can learn more information about the rule...). ACTION: Final rule. SUMMARY: Under section 110(k)(3) of the Clean Air Act (CAA), EPA is disapproving an...) of the CAA, we are also conditionally approving a revision of paragraph (BBB)(1) of OAC 3745-21-09...
21 CFR 814.46 - Withdrawal of approval of a PMA.
Code of Federal Regulations, 2010 CFR
2010-04-01
...) MEDICAL DEVICES PREMARKET APPROVAL OF MEDICAL DEVICES FDA Action on a PMA § 814.46 Withdrawal of approval of a PMA. (a) FDA may issue an order withdrawing approval of a PMA if, from any information available to the agency, FDA determines that: (1) Any of the grounds under section 515(e)(1) (A)-(G) of the act...
21 CFR 814.46 - Withdrawal of approval of a PMA.
Code of Federal Regulations, 2013 CFR
2013-04-01
...) MEDICAL DEVICES PREMARKET APPROVAL OF MEDICAL DEVICES FDA Action on a PMA § 814.46 Withdrawal of approval of a PMA. (a) FDA may issue an order withdrawing approval of a PMA if, from any information available to the agency, FDA determines that: (1) Any of the grounds under section 515(e)(1) (A)-(G) of the act...
21 CFR 814.46 - Withdrawal of approval of a PMA.
Code of Federal Regulations, 2014 CFR
2014-04-01
...) MEDICAL DEVICES PREMARKET APPROVAL OF MEDICAL DEVICES FDA Action on a PMA § 814.46 Withdrawal of approval of a PMA. (a) FDA may issue an order withdrawing approval of a PMA if, from any information available to the agency, FDA determines that: (1) Any of the grounds under section 515(e)(1) (A)-(G) of the act...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-02
... submitted by the Commonwealth of Virginia. The revision establishes the addition of nitrogen oxides (NO X... locating in Prevention of Significant Deterioration (PSD) areas. EPA is approving the addition of NO X as a... approval'' for reasons that will not deny this action as being fully approved. This revision to add NO X as...
DOE Office of Scientific and Technical Information (OSTI.GOV)
David Strand
2006-05-01
This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 219, Septic Systems and Injection Wells, in Areas 3, 16, and 23 of the Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 219 is comprised of the following corrective action sites (CASs): (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. The purpose of this Corrective Action Decision Document/Closure Report ismore » to provide justification and documentation supporting the recommendation for closure of CAU 219 with no further corrective action beyond the application of a use restriction at CASs 16-04-01, 16-04-02, and 16-04-03. To achieve this, corrective action investigation (CAI) activities were performed from June 20 through October 12, 2005, as set forth in the CAU 219 Corrective Action Investigation Plan and Record of Technical Change No. 1. A best management practice was implemented at CASs 16-04-01, 16-04-02, and 16-04-03, and corrective action was performed at CAS 23-20-01 between January and April 2006. In addition, a use restriction will be applied to CASs 16-04-01, 16-04-02, and 16-04-03 to provide additional protection to Nevada Test Site personnel. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If COCs are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 219 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. A Tier 2 evaluation was conducted, and a FAL of 185,000 micrograms per kilogram was calculated for chlordane at CASs 16-04-01, 16-04-02, and 16-04-03 based on an occasional use area exposure scenario. This evaluation of chlordane based on the Tier 2 FAL determined that no FALs were exceeded. Therefore, the DQO data needs were met, and it was determined that no corrective action (based on risk to human receptors) is necessary for the site. The following contaminants were determined to be present at concentrations exceeding their corresponding FALs: (1) The surface soil surrounding the main concrete pad at CAS 23-20-01 contained Aroclor-1254, Aroclor-1260, and chlordane above the FALs. This soil, along with the COCs, was subsequently removed at CAS 23-20-01. (2) The sludge in the concrete box of the catch basin at the large concrete pad at CAS 23-20-01 contained lead and benzo(a)pyrene above the FALs. This contamination was limited to the sludge in the concrete box of the catch basin and did not migrate to the subsurface features beneath it. The contaminated and the concrete box of the catch basin were subsequently recovered at CAS 23-20-01.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2006-05-01
This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 151, Septic Systems and Discharge Area, at the Nevada Test Site, Nevada, according to the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 151 is comprised of eight corrective action sites (CASs): (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). The purpose of this Corrective Action Decision Document ismore » to identify and provide the rationale for the recommendation of corrective action alternatives (CAAs) for each of the eight CASs within CAU 151. Corrective action investigation (CAI) activities were performed from September 12 through November 18, 2005, as set forth in the CAU 151 Corrective Action Investigation Plan and Record of Technical Change No. 1. Additional confirmation sampling was performed on December 9, 2005; January 10, 2006; and February 13, 2006. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern for each CAS. The results of the CAI identified contaminants of concern at two of the eight CASs in CAU 151 and required the evaluation of CAAs. Assessment of the data generated from investigation activities conducted at CAU 151 revealed the following: (1) Soils at CASs 02-05-01, 12-04-01, 12-04-02, 12-04-03, 12-47-01, 18-03-01, 18-99-09, and Lagoons B through G of CAS 12-03-01 do not contain contamination at concentrations exceeding the FALs. (2) Lagoon A of CAS 12-03-01 has arsenic above FALs in shallow subsurface soils. (3) One of the two tanks of CAS 12-04-01, System No.1, has polychlorinated biphenyls (aroclor-1254), trichloroethane, and cesium-137 above FALs in the sludge. Both CAS 12-04-01, System No.1 tanks contain trichloroethane and 1,4-dichlorobenzene above ''Resource Conservation and Recovery Act'' toxicity characteristic limits. Based on the evaluation of analytical data from the CAI, review of future and current operations at the eight CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 151. No Further Action is the recommended corrective action for soils at CASs 02-05-01, 12-04-01, 12-04-02, 12-04-03, 18-03-01, and 18-99-09; and Lagoons C, D, F, and G of CAS 12-03-01. No Further Action with implementation of a best management practice (BMP) is recommended for soils at CAS 12-47-01 and Lagoons B and E of CAS 12-03-01. To be protective of future workers should the present scenario used to calculate FALs change, an administrative use restriction will be recorded per the FFACO agreement as a BMP. Close in Place with Administrative Controls is the recommended corrective action for Lagoon A of CAS 12-03-01. Based on the evaluation of analytical data from the CAI; review of future and current operations at CASs 12-04-01, 12-04-02, and 12-04-03; and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for the septic tanks at these CASs. No Further Action with implementation of BMPs is the recommended corrective action for septic tanks that do not contain potential source material from CAS 12-04-01, System No.4 (four tanks); CAS 12-04-02, System No.5 (six tanks); and CAS 12-04-03, System No.3 (four tanks). Clean Closure with implementation of BMPs is the recommended corrective action for the septic tanks from CAS 12-04-01, System No.1 (two tanks). The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposure pathways to the contaminated media to an acceptable level at CAU 151.« less
78 FR 28620 - Renewal of Approved Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-15
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWO250000.L12200000.EA0000] Renewal of Approved Information Collection AGENCY: Bureau of Land Management, Interior. ACTION: 60-Day notice and... Management (BLM) invites public comments on, and plans to request approval to continue, the collection of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-27
... Activities: Requests for Comments; Clearance of Renewed Approval of Information Collection: Maintenance, Preventative Maintenance, Rebuilding and Alteration AGENCY: Federal Aviation Administration (FAA), DOT. ACTION... invites public comments about our intention to request the Office of Management and Budget (OMB) approval...
78 FR 56648 - Notice of a Request for a Reinstatement of a Currently Approved Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-13
... DEPARTMENT OF AGRICULTURE Foreign Agricultural Service Notice of a Request for a Reinstatement of a Currently Approved Information Collection AGENCY: Foreign Agricultural Service, USDA. ACTION... notice announces that the Foreign Agricultural Service (FAS) intends to reinstate a currently approved...
75 FR 63254 - Notice of Actions Taken at September 16, 2010, Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-14
... water resources projects; (2) approved and tabled certain water resources projects, including approval of one project involving diversions into the basin; and (3) rescinded approval for two water resources projects. DATES: September 16, 2010. ADDRESSES: Susquehanna River Basin Commission, 1721 N. Front...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-14
... Approval of an Information Collection: Regional Analysis of Impediments Guidance for Sustainable Communities Grantees AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: In... Budget (OMB) emergency approval of the information collection described in this notice. DATES: Comments...
75 FR 38177 - Proposed Collection; Comment Request for Form 5306-A
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-01
... Form 5306-A, Application for Approval of Prototype Simplified Employee Pension (SEP) or [email protected] . SUPPLEMENTARY INFORMATION: Title: Application for Approval of Prototype Simplified Employee... collected is used to determine if the prototype plan submitted is an approved plan. Current Actions: There...
Code of Federal Regulations, 2010 CFR
2010-10-01
...) for a new entrant to take corrective action to remedy its safety management practices? 385.323 Section....319(c) for a new entrant to take corrective action to remedy its safety management practices? (a... determines the new entrant is making a good faith effort to remedy its safety management practices. (b) FMCSA...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-15
... redesignation. The maintenance plan includes an insignificance determination for the on-road motor vehicle... and Approval of the Associated Maintenance Plan AGENCY: Environmental Protection Agency (EPA). ACTION... proposing to approve the maintenance plan SIP revision that the State submitted in conjunction with its...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-06
...). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve California's Airborne Toxic Control Measure... Resources Board (CARB) for approval to implement and enforce California's Airborne Toxic Control Measure for... Dry Cleaning ATCM California's Airborne Toxic Control Measure for Emissions of Perchloroethylene from...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-16
... Currently Approved Total Coliform Analytical Methods AGENCY: Environmental Protection Agency (EPA). ACTION... of currently approved Total Coliform Rule (TCR) analytical methods. At these meetings, stakeholders will be given an opportunity to discuss potential elements of a method re-evaluation study, such as...
78 FR 52893 - Approval and Promulgation of Implementation Plans; State of Iowa
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-27
... (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the State... Board of Health Rules and Regulations. These proposed revisions reflect updates to the Iowa statewide rules previously approved by EPA and will ensure consistency between the applicable local agency rules...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
... Activities; Submission to OMB for Review and Approval; Comment Request; Asbestos-Containing Materials in Schools and Asbestos Model Accreditation Plans AGENCY: Environmental Protection Agency (EPA). ACTION... Management and Budget (OMB) for review and approval: Asbestos-Containing Materials in Schools and Asbestos...
76 FR 50536 - Projects Approved or Rescinded for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-15
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved or Rescinded for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects... the consumptive use of water pursuant to the Commission's approval by rule process set forth in 18 CFR...
76 FR 20802 - Projects Approved or Rescinded for Consumptive Uses of Water
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-13
... SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved or Rescinded for Consumptive Uses of Water AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: This notice lists the projects... the consumptive use of water pursuant to the Commission's approval by rule process set forth in 18 CFR...
76 FR 49525 - Advisory Circular 20-24C, Approval of Propulsion Fuels and Lubricating Oils
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-10
... Propulsion Fuels and Lubricating Oils AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of..., Approval of Propulsion Fuels and Lubricating Oils. This AC provides guidance on regulations and policy... approve aircraft, engines, or APUs to operate with specified propulsion fuels and lubricating oils. DATES...
78 FR 70062 - Withdrawal of Approval of New Animal Drug Applications; Carbarsone; Roxarsone
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-22
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2013-N-0002] Withdrawal of Approval of New Animal Drug Applications; Carbarsone; Roxarsone AGENCY: Food and Drug Administration, HHS. ACTION: Notice. SUMMARY: The Food and Drug Administration (FDA) is withdrawing approval of...
77 FR 13348 - Approval of VIP Chemical, Inc., As a Commercial Gauger
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-06
... DEPARTMENT OF HOMELAND SECURITY U.S. Customs and Border Protection Approval of VIP Chemical, Inc., As a Commercial Gauger AGENCY: U.S. Customs and Border Protection, Department of Homeland Security. ACTION: Notice of approval of VIP Chemical, Inc., as a commercial gauger. SUMMARY: Notice is hereby given...
78 FR 69040 - Notice of Request for Extension of a Currently Approved Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-18
... Currently Approved Information Collection AGENCY: Rural Business-Cooperative Service, USDA. ACTION: Proposed... approved information collection in support of the program for 7 CFR Part 4284, subpart J, Value-Added... functions of the Rural Business-Cooperative Service, including whether the information will have practical...
77 FR 48167 - Approved Tribal-State Class III Gaming Compact; Indian Gaming
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-13
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Approved Tribal--State Class III Gaming Compact; Indian Gaming AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice of Approved Tribal... the Eastern Band of Cherokee Indians and the State of North Carolina. DATES: Effective Date: August 13...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-30
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R03-OAR-2010-0771; FRL-9233-4] Approval and... Emissions From Existing Hospital/Medical/Infectious Waste Incinerator (HMIWI) Units, Negative Declaration and Withdrawal of EPA Plan Approval AGENCY: Environmental Protection Agency (EPA). ACTION: Direct...