NASA Astrophysics Data System (ADS)
Ren, Yilong; Duan, Xitong; Wu, Lei; He, Jin; Xu, Wu
2017-06-01
With the development of the “VR+” era, the traditional virtual assembly system of power equipment has been unable to satisfy our growing needs. In this paper, based on the analysis of the traditional virtual assembly system of electric power equipment and the application of VR technology in the virtual assembly system of electric power equipment in our country, this paper puts forward the scheme of establishing the virtual assembly system of power equipment: At first, we should obtain the information of power equipment, then we should using OpenGL and multi texture technology to build 3D solid graphics library. After the completion of three-dimensional modeling, we can use the dynamic link library DLL package three-dimensional solid graphics generation program to realize the modularization of power equipment model library and power equipment model library generated hidden algorithm. After the establishment of 3D power equipment model database, we set up the virtual assembly system of 3D power equipment to separate the assembly operation of the power equipment from the space. At the same time, aiming at the deficiency of the traditional gesture recognition algorithm, we propose a gesture recognition algorithm based on improved PSO algorithm for BP neural network data glove. Finally, the virtual assembly system of power equipment can really achieve multi-channel interaction function.
Tools and Equipment Modeling for Automobile Interactive Assembling Operating Simulation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wu Dianliang; Zhu Hongmin; Shanghai Key Laboratory of Advance Manufacturing Environment
Tools and equipment play an important role in the simulation of virtual assembly, especially in the assembly process simulation and plan. Because of variety in function and complexity in structure and manipulation, the simulation of tools and equipments remains to be a challenge for interactive assembly operation. Based on analysis of details and characteristics of interactive operations for automobile assembly, the functional requirement for tools and equipments of automobile assembly is given. Then, a unified modeling method for information expression and function realization of general tools and equipments is represented, and the handling methods of manual, semi-automatic, automatic tools andmore » equipments are discussed. Finally, the application in assembly simulation of rear suspension and front suspension of Roewe 750 automobile is given. The result shows that the modeling and handling methods are applicable in the interactive simulation of various tools and equipments, and can also be used for supporting assembly process planning in virtual environment.« less
NASA Technical Reports Server (NTRS)
Sours, Thomas J.
1989-01-01
A concept is described for the assembly of the outboard PV modules for Space Station Freedom. Analysis of the on-orbit assembly operations was performed using CADAM design graphics software. A scenario for assembly using the various assembly equipment, as currently defined, is described in words, tables and illustrations. This work is part of ongoing studies in the area of space station assembly. The outboard PV module and the assembly equipment programs are all in definition and preliminary design phases. An input is provided to the design process of assembly equipment programs. It is established that the outboard PV module assembly operations can be performed using the assembly equipment currently planned in the Space Station Freedom Program.
NASA Technical Reports Server (NTRS)
1974-01-01
Communications equipment for use with the Skylab project is examined to show compliance with contract requirements. The items of equipment considered are: (1) communications carrier assemblies, (2) filter bypass adapter assemblies, and (3) sub-assemblies, parts, and repairs. Additional information is provided concerning contract requirements, test requirements, and failure investigation actions.
Lunar surface construction and assembly equipment study: Lunar Base Systems Study (LBSS) task 5.3
NASA Technical Reports Server (NTRS)
1988-01-01
A set of construction and assembly tasks required on the lunar surface was developed, different concepts for equipment applicable to the tasks determined, and leading candidate systems identified for future conceptual design. Data on surface construction and assembly equipment systems are necessary to facilitate an integrated review of a complete lunar scenario.
ARCHITECTURAL, 777M, PHYSICS ASSEMBLY LABORATORY BUILDING, EQUIPMENT ARRANGEMENT SECTIONS ...
ARCHITECTURAL, 777-M, PHYSICS ASSEMBLY LABORATORY BUILDING, EQUIPMENT ARRANGEMENT SECTIONS B AND C (W157132) - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC
The precision measurement and assembly for miniature parts based on double machine vision systems
NASA Astrophysics Data System (ADS)
Wang, X. D.; Zhang, L. F.; Xin, M. Z.; Qu, Y. Q.; Luo, Y.; Ma, T. M.; Chen, L.
2015-02-01
In the process of miniature parts' assembly, the structural features on the bottom or side of the parts often need to be aligned and positioned. The general assembly equipment integrated with one vertical downward machine vision system cannot satisfy the requirement. A precision automatic assembly equipment was developed with double machine vision systems integrated. In the system, a horizontal vision system is employed to measure the position of the feature structure at the parts' side view, which cannot be seen with the vertical one. The position measured by horizontal camera is converted to the vertical vision system with the calibration information. By careful calibration, the parts' alignment and positioning in the assembly process can be guaranteed. The developed assembly equipment has the characteristics of easy implementation, modularization and high cost performance. The handling of the miniature parts and assembly procedure were briefly introduced. The calibration procedure was given and the assembly error was analyzed for compensation.
Advanced techniques for repair of irradiated PWR fuel assemblies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Knaab, H.; Westphal, M.
Kraftwerk union has recently designed and built a portable repair unit for use in nuclear power plants for repair of defective fuel assemblies where space limitations do not allow permanent installation of repair equipment. This new equipment is designed to be easily disassembled and decontaminated. The main component of the equipment is the fuel assembly reconstitution unit (FARU) which is placed on the floor of the spent fuel pool. The use of the FARU is described in the paper.
Installation and Assembly, Electrical Ground Support Equipment (GSE), Specification for
NASA Technical Reports Server (NTRS)
Denson, Erik C.
2014-01-01
This specification covers the general workmanship requirements and procedures for the complete installation and assembly of electrical ground support equipment (EGSE) such as terminal distributors, junction boxes, conduit and fittings, cable trays and accessories, interconnecting cables (including routing requirements), motor-control equipment, and necessary hardware as specified by the applicable contract and drawings.
Equipment development for automated assembly of solar modules
NASA Technical Reports Server (NTRS)
Hagerty, J. J.
1982-01-01
Prototype equipment was developed which allows for totally automated assembly in the three major areas of module manufacture: cell stringing, encapsulant layup and cure and edge sealing. The equipment is designed to be used in conjunction with a standard Unimate 2000B industrial robot although the design is adaptable to other transport systems.
Portable propellant cutting assembly, and method of cutting propellant with assembly
NASA Technical Reports Server (NTRS)
Sharp, Roger A. (Inventor); Hoskins, Shawn W. (Inventor); Payne, Brett D. (Inventor)
2002-01-01
A propellant cutting assembly and method of using the assembly to cut samples of solid propellant in a repeatable and consistent manner is disclosed. The cutting assembly utilizes two parallel extension beams which are shorter than the diameter of a central bore of an annular solid propellant grain and can be loaded into the central bore. The assembly is equipped with retaining heads at its respective ends and an adjustment mechanism to position and wedge the assembly within the central bore. One end of the assembly is equipped with a cutting blade apparatus which can be extended beyond the end of the extension beams to cut into the solid propellant.
Industrial Technology Modernization Program. Project 32. Factory Vision. Phase 2
1988-04-01
instructions for the PWA’s, generating the numerical control (NC) program instructions for factory assembly equipment, controlling the process... generating the numerical control (NC) program instructions for factory assembly equipment, controlling the production process instructions and NC... Assembly Operations the "Create Production Process Program" will automatically generate a sequence of graphics pages (in paper mode), or graphics screens
Astronaut Alan Bean works on Modular Equipment Stowage Assembly
NASA Technical Reports Server (NTRS)
1969-01-01
Astronaut Alan L. Bean, lunar module pilot for the Apollo 12 lunar landing mission, works at the Modular Equipment Stowage Assembly (MESA) on the Apollo 12 Lunar Module during the mission's first extravehicular activity, EVA-1, on November 19, 1969.
Replacing ODCs in a Critical Hand Cleaning Manual Electronics Assembly Operation
NASA Technical Reports Server (NTRS)
Bonner, J. K.; Walton, Sharon
1997-01-01
The manufacture of high reliability electronics assemblies for spacecraft and ground support equipment still often involves manual assembly processes. In addition, rework and repair of critical assemblies aslo often entails manual assembly processes.
41 CFR 109-50.203 - Eligible equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Eligible equipment. (a) Education-related and research equipment will include, but is not limited to the..., Components, Assemblies and Accessories. 61Electric Wire, and Power and Distribution Equipment. 66Instruments...
46 CFR 197.346 - Diver's equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... using SCUBA must have— (1) Self-contained underwater breathing equipment including— (i) A primary..., gloves, shoes, weight assembly, and knife; (3) Have a hose group consisting of the breathing gas hose and... assembly capable of quick release; (3) A mask group consisting of a lightweight mask and associated valves...
Evaluation of test equipment for the detection of contamination on electronic circuits
NASA Astrophysics Data System (ADS)
Bergendahl, C. G.; Dunn, B. D.
1984-08-01
The reproducibility, sensitivity and ease of operation of test equipment for the detection of ionizable contaminants on the surface of printed circuit assemblies were assessed. The characteristics of the test equipment are described. Soldering fluxes were chosen as contaminants and were applied in controlled amounts to printed-circuit board assemblies possessing two different component populations. Results show that the relationship between equipment readings varies with flux type. Each kind of test equipment gives a good measure of board cleanliness, although reservations exist concerning the interpretation of such results. A test method for the analysis of total (organic and inorganic) halides in solder fluxes is presented.
48 CFR 239.7409 - Special assembly.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Special assembly. 239.7409... Services 239.7409 Special assembly. (a) Special assembly is the designing, manufacturing, arranging... general use equipment. (b) Special assembly rates and charges shall be based on estimated costs. The...
48 CFR 239.7409 - Special assembly.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Special assembly. 239.7409... Services 239.7409 Special assembly. (a) Special assembly is the designing, manufacturing, arranging... general use equipment. (b) Special assembly rates and charges shall be based on estimated costs. The...
48 CFR 239.7409 - Special assembly.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Special assembly. 239.7409... Services 239.7409 Special assembly. (a) Special assembly is the designing, manufacturing, arranging... general use equipment. (b) Special assembly rates and charges shall be based on estimated costs. The...
48 CFR 239.7409 - Special assembly.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Special assembly. 239.7409... Services 239.7409 Special assembly. (a) Special assembly is the designing, manufacturing, arranging... general use equipment. (b) Special assembly rates and charges shall be based on estimated costs. The...
48 CFR 239.7409 - Special assembly.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Special assembly. 239.7409... Services 239.7409 Special assembly. (a) Special assembly is the designing, manufacturing, arranging... general use equipment. (b) Special assembly rates and charges shall be based on estimated costs. The...
Apollo experience report: Crew provisions and equipment subsystem
NASA Technical Reports Server (NTRS)
Mcallister, F.
1972-01-01
A description of the construction and use of crew provisions and equipment subsystem items for the Apollo Program is presented. The subsystem is composed principally of survival equipment, bioinstrumentation devices, medical components and accessories, water- and waste-management equipment, personal-hygiene articles, docking aids, flight garments (excluding the pressure garment assembly), and various other crew-related accessories. Particular attention is given to items and assemblies that presented design, development, or performance problems: the crew optical alinement sight system, the metering water dispenser, and the waste-management system. Changes made in design and materials to improve the fire safety of the hardware are discussed.
SKYLAB (SL)-3 - EXPERIMENT HARDWARE
1973-11-08
S74-19675 (1974) --- Medium close-up view of the M512 materials processing equipment storage assembly and the M518 electric furnace in the Multiple Docking Adapter (MDA), one of the primary elements of the Skylab space station. The assembly holds equipment designed to explore space manufacturing capability in a weightless state. Photo credit: NASA
Assembling of Steel Angle Headframe of Multifunctional Purpose
NASA Astrophysics Data System (ADS)
Kassikhina, E. G.; Pershin, V. V.; Volkov, V. M.
2017-10-01
The article reviews new technical solution on equipment provision of vertical shaft utilizing steel headframe of multifunctional purpose. Practice of construction of coal and ore mines provides application of various designs for steel angle headframes which are divided into separate large assembly blocks and constructive elements during assembling operations. Design of these blocks and elements, their weight and dimensions effect the chose of the method of assembling on which economic and technological indicators, as well as duration of down-time, depend on during performance of construction operations in shaft. The technical solution on equipment provision for mine vertical shaft using headframe of multifunctional purpose will allow changing the management construction of vertical shaft. The proposed headframe combines the functions of sinking and operation that eliminates costs for assembling/dissembling of temporary headgear. The constructive design of the headgear allows application of the effective method of assembly and thus to provide improvement of the technical and economic indexes, and high calendar time rate of the shaft construction due to reduction of duration of works on equipment provision for the shaft and to refurbishment of the shaft in order to carry out horizontal mining.
USAF Minor Surgery Field Assembly,
1982-10-01
Brooks Air Force Base, Texas 78235 rs or 11 s0 036 .; :._,. ,. . . . . ... NOTICES This review was submitted by personnel of the Dental Investigation...Field equipment, dental Disaster-medicine eauipment 20. ABSTRACT (Condihis on revere* side It necessar end identify by block mmbe) -The history of...24 Field Assembly Handpieces ..... . . . . . .. . 24 Other Items of Equipment and Supplies . . . . .... .... 24 B!BLIOGRAPHY
Code of Federal Regulations, 2011 CFR
2011-01-01
... produced or assembled in a foreign country which is a contracting party to the ATP. 3300.67 Section 3300.67... BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT... a foreign country which is a contracting party to the ATP. An application for certification of...
Code of Federal Regulations, 2014 CFR
2014-01-01
... produced or assembled in a foreign country which is a contracting party to the ATP. 3300.67 Section 3300.67... BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT... a foreign country which is a contracting party to the ATP. An application for certification of...
Code of Federal Regulations, 2010 CFR
2010-01-01
... produced or assembled in a foreign country which is a contracting party to the ATP. 3300.67 Section 3300.67... BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT... a foreign country which is a contracting party to the ATP. An application for certification of...
Code of Federal Regulations, 2013 CFR
2013-01-01
... produced or assembled in a foreign country which is a contracting party to the ATP. 3300.67 Section 3300.67... BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT... a foreign country which is a contracting party to the ATP. An application for certification of...
Code of Federal Regulations, 2012 CFR
2012-01-01
... produced or assembled in a foreign country which is a contracting party to the ATP. 3300.67 Section 3300.67... BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT... a foreign country which is a contracting party to the ATP. An application for certification of...
ERIC Educational Resources Information Center
Manpower Administration (DOL), Washington, DC. U.S. Training and Employment Service.
The United States Training and Employment Service General Aptitude Test Battery (GATB), first published in 1947, has been included in a continuing program of research to validate the tests against success in many different occupations. The GATB consists of 12 tests which measure nine aptitudes: General Learning Ability; Verbal Aptitude; Numerical…
5. INTERIOR VIEW, LOOKING WEST, ALONG ASSEMBLY LINE WITH WELDING ...
5. INTERIOR VIEW, LOOKING WEST, ALONG ASSEMBLY LINE WITH WELDING OF THE HOPPER SIDE AND GATE FRAMES, THE FIRST ASSEMBLY OF THE SUBASSEMBLIES. STEEL FRAME (TOP OF PHOTOGRAPH) CALLED THE 'HIGHLINE,' HOLDS CRANES AND EQUIPMENT NEEDED FOR RAIL CAR ASSEMBLY. - Pullman Standard Company Plant, Fabrication Assembly Shop, 401 North Twenty-fourth Street, Bessemer, Jefferson County, AL
Four-port gas separation membrane module assembly
Wynn, Nicholas P.; Fulton, Donald A.; Lokhandwala, Kaaeid A.; Kaschemekat, Jurgen
2010-07-20
A gas-separation membrane assembly, and a gas-separation process using the assembly. The assembly incorporates multiple gas-separation membranes in an array within a single vessel or housing, and is equipped with two permeate ports, enabling permeate gas to be withdrawn from both ends of the membrane module permeate pipes.
40 CFR 1054.610 - What is the exemption for delegated final assembly?
Code of Federal Regulations, 2013 CFR
2013-07-01
... final assembly? 1054.610 Section 1054.610 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... EQUIPMENT Special Compliance Provisions § 1054.610 What is the exemption for delegated final assembly? The provisions of 40 CFR 1068.261 related to delegated final assembly do not apply for handheld engines certified...
40 CFR 1054.610 - What is the exemption for delegated final assembly?
Code of Federal Regulations, 2012 CFR
2012-07-01
... final assembly? 1054.610 Section 1054.610 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... EQUIPMENT Special Compliance Provisions § 1054.610 What is the exemption for delegated final assembly? The provisions of 40 CFR 1068.261 related to delegated final assembly do not apply for handheld engines certified...
40 CFR 1054.610 - What is the exemption for delegated final assembly?
Code of Federal Regulations, 2010 CFR
2010-07-01
... final assembly? 1054.610 Section 1054.610 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... EQUIPMENT Special Compliance Provisions § 1054.610 What is the exemption for delegated final assembly? The provisions of 40 CFR 1068.261 related to delegated final assembly do not apply for handheld engines certified...
40 CFR 1054.610 - What is the exemption for delegated final assembly?
Code of Federal Regulations, 2011 CFR
2011-07-01
... final assembly? 1054.610 Section 1054.610 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... EQUIPMENT Special Compliance Provisions § 1054.610 What is the exemption for delegated final assembly? The provisions of 40 CFR 1068.261 related to delegated final assembly do not apply for handheld engines certified...
40 CFR 1054.610 - What is the exemption for delegated final assembly?
Code of Federal Regulations, 2014 CFR
2014-07-01
... final assembly? 1054.610 Section 1054.610 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... EQUIPMENT Special Compliance Provisions § 1054.610 What is the exemption for delegated final assembly? The provisions of 40 CFR 1068.261 related to delegated final assembly do not apply for handheld engines certified...
Use of medical and dental X-ray equipment for nondestructive testing
NASA Technical Reports Server (NTRS)
1969-01-01
Industrial X ray equipment is used for nondestructive testing to detect defects in metal joints, electrical terminal blocks, sealed assemblies, and other hardware. Medical and dental X ray equipment is also used for hardware troubleshooting.
Special test equipment and fixturing for MSAT reflector assembly alignment
NASA Technical Reports Server (NTRS)
Young, Jeffrey A.; Zinn, Michael R.; Mccarten, David R.
1994-01-01
The MSAT Reflector Assembly is a state of the art subsystem for Mobile Satellite (MSAT), a geosynchronous-based commercial mobile telecommunication satellite program serving North America. The Reflector Assembly consisted of a deployable, three-hinge, folding-segment Boom, deployable 5.7 x 5.3-meter 16-rib Wrap-Rib Reflector, and a Reflector Pointing Mechanism (RPM). The MSAT spacecraft was based on a Hughes HS601 spacecraft bus carrying two Reflector Assemblies independently dedicated for L-band transmit and receive operations. Lockheed Missiles and Space Company (LMSC) designed and built the Reflector Assembly for MSAT under contract to SPAR Aerospace Ltd. Two MSAT satellites were built jointly by SPAR Aerospace Ltd. and Hughes Space and Communications Co. for this program, the first scheduled for launch in 1994. When scaled for wavelength, the assembly and alignment requirements for the Reflector Assembly were in many instances equivalent to or exceeded that of a diffraction-limited visible light optical system. Combined with logistical constraints inherent to large, compliant, lightweight structures; 'bolt-on' alignment; and remote, indirect spacecraft access; the technical challenges were formidable. This document describes the alignment methods, the special test equipment, and fixturing for Reflector Assembly assembly and alignment.
Developmental Play Equipment for Home and School.
ERIC Educational Resources Information Center
Gallahue, David L.
This book is a compilation of homemade and inexpensive developmental play equipment ideas that may be used in the home and school with preschool and elementary school children. Each equipment idea contains the objectives for its use, the materials and approximate cost, how to assemble the equipment, and a variety of activity ideas. Illustrations…
VIEW OF ULTRASONIC TESTING EQUIPMENT IN BUILDING 991. THIS EQUIPMENT ...
VIEW OF ULTRA-SONIC TESTING EQUIPMENT IN BUILDING 991. THIS EQUIPMENT NON-DESTRUCTIVELY TESTS WEAPONS COMPONENTS FOR FLAWS AND CRACKS. (9/11/85) - Rocky Flats Plant, Final Assembly & Shipping, Eastern portion of plant site, south of Spruce Avenue, east of Tenth Street & north of Central Avenue, Golden, Jefferson County, CO
New Technical Solution for Vertical Shaft Equipping Using Steel Headframe of Multifunction Purpose
NASA Astrophysics Data System (ADS)
Kassikhina, Elena; Pershin, Vladimir; Glazkov, Yurij
2017-11-01
The article reviews a novel approach to the design of steel angle headframe for vertical shafts of coal and ore mines on the basis of rational design solutions. Practice of construction of coal and ore mines provides application of various designs for steel angle headframes which are divided into separate large assembly blocks and constructive elements during assembling operations. Design of these blocks and elements, their weight and dimensions effect the chose of the method of assembling on which economic and technological indicators, as well as duration of down-time, depend on during performance of construction operations in shaft. The technical solution on equipment provision for mine vertical shaft using headframe of multifunctional purpose will allow changing the management construction of vertical shaft. The constructive design of the headgear allows application of the effective method of assembly and thus to provide improvement of the technical and economic indexes, and high calendar time rate of the shaft construction due to reduction of duration of works on equipment provision for the shaft and to refurbishment of the shaft in order to carry out horizontal mining.
Bioenergetic Approaches and Inflammation of MPTP Toxicity
2006-09-01
with 8 strokes of pestle A followed by 8 strokes of pestle B. The brain homogenate was centrifuged at 1250 g for 3 min; pellet was discarded and...legends to figures. Fluorescence of safranin O was measured with an F4500 fluorimeter (Hitachi, Japan ) equipped with a magnetic stirring assembly and...and 531 nm emission wavelengths with F4500 fluorimeter (Hitachi, Japan ) equipped with a magnetic stirring assembly and a thermostated cuvette holder
30 CFR 36.23 - Engine intake system.
Code of Federal Regulations, 2011 CFR
2011-07-01
... suitable means for secure assembly, or shall meet the requirements for flanged metal-to-metal flame-proof... deterioration in service. It shall be so mounted in the equipment assembly that it is protected from accidental... that will arrest the propagation of an explosion and shall be so designed that improper assembly is...
30 CFR 36.23 - Engine intake system.
Code of Federal Regulations, 2010 CFR
2010-07-01
... suitable means for secure assembly, or shall meet the requirements for flanged metal-to-metal flame-proof... deterioration in service. It shall be so mounted in the equipment assembly that it is protected from accidental... that will arrest the propagation of an explosion and shall be so designed that improper assembly is...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-13
... design change for the combustion chamber liner assembly. This proposed AD would retain the requirements... design change to the combustion chamber liner assembly. The current design of the combustion chamber liner assembly is a one- piece configuration. The new design change involves replacing the combustion...
Code of Federal Regulations, 2011 CFR
2011-10-01
... TERMINAL EQUIPMENT TO THE TELEPHONE NETWORK General § 68.3 Definitions. As used in this part: Demarcation... switched telephone network with the applicable rules and regulations in this part and with the technical... network, or if the equipment is imported, the importer, or if the terminal equipment is assembled from...
Code of Federal Regulations, 2010 CFR
2010-10-01
... TERMINAL EQUIPMENT TO THE TELEPHONE NETWORK General § 68.3 Definitions. As used in this part: Demarcation... switched telephone network with the applicable rules and regulations in this part and with the technical... network, or if the equipment is imported, the importer, or if the terminal equipment is assembled from...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-28
... assemblies; oil/fuel filters; air/oil separation equipment; air filters/elements; catalytic converters... assemblies; AC line filters; dielectric items of paper/plastic; capacitors; circuit breakers; switching...
Optical Assembly and Characterization System for Nano-Photonics Research
2016-03-01
Unlimited Final Report: Optical Assembly and Characterization System for Nano -Photonics Research The views, opinions and/or findings contained in this...reviewed journals: Final Report: Optical Assembly and Characterization System for Nano -Photonics Research Report Title With this equipment funding support...Assembly and Characterization System for Nano -Photonics Research PI: Prof. Weidong Zhou, University of Texas at Arlington (UTA) 500 S. Cooper St
30 CFR 18.44 - Non-intrinsically safe battery-powered equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Non-intrinsically safe battery-powered... Construction and Design Requirements § 18.44 Non-intrinsically safe battery-powered equipment. (a) Battery-powered equipment shall use battery assemblies approved under Part 7 of this chapter, or battery...
30 CFR 18.44 - Non-intrinsically safe battery-powered equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Non-intrinsically safe battery-powered... Construction and Design Requirements § 18.44 Non-intrinsically safe battery-powered equipment. (a) Battery-powered equipment shall use battery assemblies approved under Part 7 of this chapter, or battery...
30 CFR 18.44 - Non-intrinsically safe battery-powered equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Non-intrinsically safe battery-powered... Construction and Design Requirements § 18.44 Non-intrinsically safe battery-powered equipment. (a) Battery-powered equipment shall use battery assemblies approved under Part 7 of this chapter, or battery...
30 CFR 18.44 - Non-intrinsically safe battery-powered equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Non-intrinsically safe battery-powered... Construction and Design Requirements § 18.44 Non-intrinsically safe battery-powered equipment. (a) Battery-powered equipment shall use battery assemblies approved under Part 7 of this chapter, or battery...
30 CFR 18.44 - Non-intrinsically safe battery-powered equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Non-intrinsically safe battery-powered... Construction and Design Requirements § 18.44 Non-intrinsically safe battery-powered equipment. (a) Battery-powered equipment shall use battery assemblies approved under Part 7 of this chapter, or battery...
Assembly for collecting samples for purposes of identification or analysis and method of use
Thompson, Cyril V [Knoxville, TN; Smith, Rob R [Knoxville, TN
2010-02-02
An assembly and an associated method for collecting a sample of material desired to be characterized with diagnostic equipment includes or utilizes an elongated member having a proximal end with which the assembly is manipulated by a user and a distal end. In addition, a collection tip which is capable of being placed into contact with the material to be characterized is supported upon the distal end. The collection tip includes a body of chemically-inert porous material for binding a sample of material when the tip is placed into contact with the material and thereby holds the sample of material for subsequent introduction to the diagnostic equipment.
Prospective areas in the production technology of scientific equipment for space research
NASA Technical Reports Server (NTRS)
Breslavets, A. V.
1974-01-01
The average labor of individual types of operations in the percentage ratio of the total labor consumption of manufacturing scientific instruments and apparatus for space research is presented. The prospective areas in the production technology of billet, machining, mechanical assembly, installation and assembly, adjustment and regulation and testing and control operations are noted. Basic recommendations are made with respect to further reduction of labor consumption and an increase in the productivity of labor when manufacturing scientific equipment for space research.
Astronaut Alan Bean works on Modular Equipment Stowage Assembly
1969-11-19
AS12-46-6749 (19 Nov. 1969) --- Astronaut Alan L. Bean, lunar module pilot for the Apollo 12 lunar landing mission, works at the Modular Equipment Stowage Assembly (MESA) on the Apollo 12 Lunar Module (LM) during the mission's first extravehicular activity, (EVA) on Nov. 19, 1969. Astronaut Charles Conrad Jr., commander, and Bean descended in the Apollo 12 LM to explore the moon while astronaut Richard F. Gordon Jr., command module pilot, remained with the Command and Service Modules (CSM) in lunar orbit.
SKYLAB (SL) PRIME CREW - BLDG. 5 - JSC
1973-03-20
S73-20759 (1 March 1973) --- Astronaut Charles Conrad Jr., commander of the first manned Skylab mission, takes items from the M512 materials processing equipment storage assembly during Skylab training at Johnson Space Center. Conrad is standing in the Multiple Docking Adapter (MDA) trainer in the JSC Mission Simulation and Training Facility. The assembly holds equipment designed to explore space manufacturing capability in a weightless state. Conrad is holding one of the experiment parts in his left hand. Photo credit: NASA
Assembly flow simulation of a radar
NASA Technical Reports Server (NTRS)
Rutherford, W. C.; Biggs, P. M.
1994-01-01
A discrete event simulation model has been developed to predict the assembly flow time of a new radar product. The simulation was the key tool employed to identify flow constraints. The radar, production facility, and equipment complement were designed, arranged, and selected to provide the most manufacturable assembly possible. A goal was to reduce the assembly and testing cycle time from twenty-six weeks. A computer software simulation package (SLAM 2) was utilized as the foundation for simulating the assembly flow time. FORTRAN subroutines were incorporated into the software to deal with unique flow circumstances that were not accommodated by the software. Detailed information relating to the assembly operations was provided by a team selected from the engineering, manufacturing management, inspection, and production assembly staff. The simulation verified that it would be possible to achieve the cycle time goal of six weeks. Equipment and manpower constraints were identified during the simulation process and adjusted as required to achieve the flow with a given monthly production requirement. The simulation is being maintained as a planning tool to be used to identify constraints in the event that monthly output is increased. 'What-if' studies have been conducted to identify the cost of reducing constraints caused by increases in output requirement.
NASA Astrophysics Data System (ADS)
Nored, Donald L.
Viewgraphs on Space Station Freedom Electrical Power System (EPS) WP-40 are presented. Topics covered include: key EPS technical requirements; photovoltaic power module systems; solar array assembly; blanket containment box and box positioning subassemblies; solar cell; bypass diode assembly; Kapton with atomic oxygen resistant coating; sequential shunt unit; gimbal assembly; energy storage subsystem; thermal control subsystem; direct current switching unit; integrated equipment assembly; PV cargo element; PMAD system; and PMC and AC architecture.
NASA Technical Reports Server (NTRS)
Nored, Donald L.
1990-01-01
Viewgraphs on Space Station Freedom Electrical Power System (EPS) WP-40 are presented. Topics covered include: key EPS technical requirements; photovoltaic power module systems; solar array assembly; blanket containment box and box positioning subassemblies; solar cell; bypass diode assembly; Kapton with atomic oxygen resistant coating; sequential shunt unit; gimbal assembly; energy storage subsystem; thermal control subsystem; direct current switching unit; integrated equipment assembly; PV cargo element; PMAD system; and PMC and AC architecture.
EMR Measurements on NDA Equipment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Macdonell, Alexander Thomas; Meierbachtol, Krista Cruse; Evans, James Walter Jr.
2017-07-10
Electromagnetic radiation (EMR) emission strength measurements were performed on a suite of passive non-destructive assay (NDA) radiation detection equipment. Data were collected from 9 kHz up to 6 GHz on each of the assembled systems.
49 CFR 583.7 - Procedure for determining major foreign sources of passenger motor vehicle equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., oil, blackout, phosphate rinse, windshield washer fluid, fasteners, tire assembly fluid, rivets... equipment, and the U.S. and Canada are treated together. (d) Determination of the percentage of the total... basis by— (1) Adding up the total value of all of the passenger motor vehicle equipment (regardless of...
49 CFR 583.7 - Procedure for determining major foreign sources of passenger motor vehicle equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., oil, blackout, phosphate rinse, windshield washer fluid, fasteners, tire assembly fluid, rivets... equipment, and the U.S. and Canada are treated together. (d) Determination of the percentage of the total... basis by— (1) Adding up the total value of all of the passenger motor vehicle equipment (regardless of...
49 CFR 583.7 - Procedure for determining major foreign sources of passenger motor vehicle equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., oil, blackout, phosphate rinse, windshield washer fluid, fasteners, tire assembly fluid, rivets... equipment, and the U.S. and Canada are treated together. (d) Determination of the percentage of the total... basis by— (1) Adding up the total value of all of the passenger motor vehicle equipment (regardless of...
49 CFR 583.7 - Procedure for determining major foreign sources of passenger motor vehicle equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., oil, blackout, phosphate rinse, windshield washer fluid, fasteners, tire assembly fluid, rivets... equipment, and the U.S. and Canada are treated together. (d) Determination of the percentage of the total... basis by— (1) Adding up the total value of all of the passenger motor vehicle equipment (regardless of...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, O.N.; Barone, G.J.
The Federal Performance Standard for Diagnostic X-ray Equipment, which became effective August 1, 1974, is primarily directed toward manufacturers, who must produce x-ray equipment that performs in a prescribed way. It is an equipment performance standard and does not reguate diagnostic x-ray uses. The dentist, however, has responsibilities in three areas - maintenance, assembly, and variance from the standard.
48 CFR 1819.1005 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Printed Circuit Assembly (Electronic Assembly) Manufacturing. 334613 Magnetic and Optical Recording Media... and Wireless Communication Equipment Manufacturing. 336415 Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing. 336419 Other Guided Missile and Space Vehicle Parts and...
48 CFR 1819.1005 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Printed Circuit Assembly (Electronic Assembly) Manufacturing. 334613 Magnetic and Optical Recording Media... and Wireless Communication Equipment Manufacturing. 336415 Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing. 336419 Other Guided Missile and Space Vehicle Parts and...
NASA Astrophysics Data System (ADS)
Kaplan, Herbert
1988-01-01
Based on encouraging results on the Army's programs for infrared mass screening of printed circuit boards at the depot level, the US Army CECOM (Communication-Electronics Command) undertook a one-year investigation of the applicability of similar techniques to screening and diagnostics of mechanical assemblies. These included tanks, helicopters, transport vehicles and their major subassemblies (transmissions, engines, axles, etc.) at field and depot levels. Honeyhill Technical Company was tasked to classify candidate assemblies and perform preliminary measurements using Army-owned general-purpose thermal imaging equipment. The investigations yielded positive results, and it was decided to pursue a comprehensive measurements program using field-mobile equipment specifically procured for the program. This paper summarizes the results of the investigations, outlines the measurements techniques utilized, describes the classification and selection of candidate assemblies, and reports on progress toward the goals of the program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... individual, partnership, company, corporation, association, or other organization, that designs, manufactures, assembles, or controls the assembly and that seeks a certificate of approval or preliminary testing of... designed. Permissible. As applied to mobile diesel-powered transportation equipment, this means that the...
NASA Technical Reports Server (NTRS)
1978-01-01
The techniques, processes, and equipment required for automatic fabrication and assembly of structural elements in space using the space shuttle as a launch vehicle and construction base were investigated. Additional construction/systems/operational techniques, processes, and equipment which can be developed/demonstrated in the same program to provide further risk reduction benefits to future large space systems were included. Results in the areas of structure/materials, fabrication systems (beam builder, assembly jig, and avionics/controls), mission integration, and programmatics are summarized. Conclusions and recommendations are given.
2015-09-09
guidance and procedures for testing the performance characteristics of runflat tires as equipped on ground vehicles. 15. SUBJECT TERMS runflat... tire assembly tread life combat flat central tire inflation system (CTIS) 16. SECURITY CLASSIFICATION OF: 17. LIMITATION...3 3.4 Tire Assemblies ..................................................................... 3 3.5 Environmental
DETAIL VIEW OF TESTING EQUIPMENT, REMOTE MANIPULATOR SYSTEM LAB, ROOM ...
DETAIL VIEW OF TESTING EQUIPMENT, REMOTE MANIPULATOR SYSTEM LAB, ROOM NO. 1N4, FACING SOUTHEAST - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
Code of Federal Regulations, 2010 CFR
2010-07-01
..., or association that designs, manufactures, assembles, or controls the assembly of an electrical... attachment of an approval plate so indicating. Approval plate means a metal plate, the design of which meets... approved (permissible) equipment. Certification label means a plate, label, or marking, the design of which...
Code of Federal Regulations, 2013 CFR
2013-07-01
..., or association that designs, manufactures, assembles, or controls the assembly of an electrical... attachment of an approval plate so indicating. Approval plate means a metal plate, the design of which meets... approved (permissible) equipment. Certification label means a plate, label, or marking, the design of which...
Code of Federal Regulations, 2011 CFR
2011-07-01
..., or association that designs, manufactures, assembles, or controls the assembly of an electrical... attachment of an approval plate so indicating. Approval plate means a metal plate, the design of which meets... approved (permissible) equipment. Certification label means a plate, label, or marking, the design of which...
Code of Federal Regulations, 2012 CFR
2012-07-01
..., or association that designs, manufactures, assembles, or controls the assembly of an electrical... attachment of an approval plate so indicating. Approval plate means a metal plate, the design of which meets... approved (permissible) equipment. Certification label means a plate, label, or marking, the design of which...
One-piece transparent shell improves design of helmet assembly
NASA Technical Reports Server (NTRS)
Jones, R. L.; Okane, J. H.
1966-01-01
One-piece transparent helmet shell made of polycarbonate is equipped with a helmet protection pad, a visor assembly, a communications skull cap, and an emergency oxygen supply. This design offers improvements over previous designs in weight, visual field, comfort and protection.
29 CFR 1926.403 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... equipment for an identified purpose may be evidenced by listing, labeling, or certification for that... listing, labeling, or certification. (c) Interrupting rating. Equipment intended to break current shall... considered to be grounded. Working space is not required in back of assemblies such as dead-front...
29 CFR 1926.403 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... equipment for an identified purpose may be evidenced by listing, labeling, or certification for that... listing, labeling, or certification. (c) Interrupting rating. Equipment intended to break current shall... considered to be grounded. Working space is not required in back of assemblies such as dead-front...
29 CFR 1926.403 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... equipment for an identified purpose may be evidenced by listing, labeling, or certification for that... listing, labeling, or certification. (c) Interrupting rating. Equipment intended to break current shall... considered to be grounded. Working space is not required in back of assemblies such as dead-front...
21. INTERIOR DETAIL OF TON CONTAINER DEMILITARIZATION EQUIPMENT IN BUILDING ...
21. INTERIOR DETAIL OF TON CONTAINER DEMILITARIZATION EQUIPMENT IN BUILDING 1606. VIEW TO SOUTHWEST. - Rocky Mountain Arsenal, Cluster Bomb Assembly-Filling-Storage Building, 3500 feet South of Ninth Avenue; 2870 feet East of D Street, Commerce City, Adams County, CO
VIEW OF INTEGRITY TESTING EQUIPMENT UTILIZING CRYOGENIC BATHS IN BUILDING ...
VIEW OF INTEGRITY TESTING EQUIPMENT UTILIZING CRYOGENIC BATHS IN BUILDING 991. (6/7/68) - Rocky Flats Plant, Final Assembly & Shipping, Eastern portion of plant site, south of Spruce Avenue, east of Tenth Street & north of Central Avenue, Golden, Jefferson County, CO
Autonomous Mechanical Assembly on the Space Shuttle: An Overview
NASA Technical Reports Server (NTRS)
Raibert, M. H.
1979-01-01
The space shuttle will be equipped with a pair of 50 ft. manipulators used to handle payloads and to perform mechanical assembly operations. Although current plans call for these manipulators to be operated by a human teleoperator. The possibility of using results from robotics and machine intelligence to automate this shuttle assembly system was investigated. The major components of an autonomous mechanical assembly system are examined, along with the technology base upon which they depend. The state of the art in advanced automation is also assessed.
10 CFR 434.402 - Building envelope assemblies and materials.
Code of Federal Regulations, 2011 CFR
2011-01-01
... MULTI-FAMILY HIGH RISE RESIDENTIAL BUILDINGS Building Design Requirements-Electric Systems and Equipment... be determined with due consideration of all major series and parallel heat flow paths through the... thermal transmittance of opaque elements of assemblies shall be determined using a series path procedure...
10 CFR 434.402 - Building envelope assemblies and materials.
Code of Federal Regulations, 2010 CFR
2010-01-01
... MULTI-FAMILY HIGH RISE RESIDENTIAL BUILDINGS Building Design Requirements-Electric Systems and Equipment... be determined with due consideration of all major series and parallel heat flow paths through the... thermal transmittance of opaque elements of assemblies shall be determined using a series path procedure...
10 CFR 434.402 - Building envelope assemblies and materials.
Code of Federal Regulations, 2013 CFR
2013-01-01
... MULTI-FAMILY HIGH RISE RESIDENTIAL BUILDINGS Building Design Requirements-Electric Systems and Equipment... be determined with due consideration of all major series and parallel heat flow paths through the... thermal transmittance of opaque elements of assemblies shall be determined using a series path procedure...
10 CFR 434.402 - Building envelope assemblies and materials.
Code of Federal Regulations, 2012 CFR
2012-01-01
... MULTI-FAMILY HIGH RISE RESIDENTIAL BUILDINGS Building Design Requirements-Electric Systems and Equipment... be determined with due consideration of all major series and parallel heat flow paths through the... thermal transmittance of opaque elements of assemblies shall be determined using a series path procedure...
10 CFR 434.402 - Building envelope assemblies and materials.
Code of Federal Regulations, 2014 CFR
2014-01-01
... MULTI-FAMILY HIGH RISE RESIDENTIAL BUILDINGS Building Design Requirements-Electric Systems and Equipment... be determined with due consideration of all major series and parallel heat flow paths through the... thermal transmittance of opaque elements of assemblies shall be determined using a series path procedure...
FILTRATION OF SALT SMOKE FROM CHLORATE CANDLE OXYGEN.
their associated equipment for use on submarines. Rockwool -wire mesh combinations were first used in welded assemblies which were cleaned by water...washing when they became clogged. The rockwool was later replaced with fiberglass blanket, and two modifications of the assembly were made, but the
Probe-And-Socket Fasteners For Robotic Assembly
NASA Technical Reports Server (NTRS)
Nyberg, Karen
1995-01-01
Self-alignment and simplicity of actuation make mechanism amenable to robotic assembly. Includes socket, mounted on structure at worksite, and probe, mounted on piece of equipment to be attached to structure at socket. Probe-and-socket mechanism used in conjunction with fixed target aiding in placement of end effector of robot during grasping, and with handle or handles on structure. Intended to enable robot to set up workstation in hostile environment. Workstation then used by astronaut, aquanaut, or other human, spending minimum time in environment. Human concentrates on performing quality work rather than on setting up equipment, with consequent reduction of risk.
Tritium safety study using Caisson Assembly (CATS) at TPL/JAEA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hayashi, T.; Kobayashi, K.; Iwai, Y.
Tritium confinement is required as the most important safety Junction for a fusion reactor. In order to demonstrate the confinement performance experimentally, an unique equipment, called CATS: Caisson Assembly for Tritium Safety study, was installed in Tritium Process Laboratory of Japan Atomic Energy Agency and operated for about 10 years. Tritium confinement and migration data in CATS have been accumulated and dynamic simulation code was accumulated using these data. Contamination and decontamination behavior on various materials and new safety equipment functions have been investigated under collaborations with a lot of laboratories and universities. (authors)
Code of Federal Regulations, 2010 CFR
2010-07-01
... PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction and Design Requirements § 18.34 Motors. Explosion-proof electric motor assemblies intended for use in approved equipment in underground... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Motors. 18.34 Section 18.34 Mineral Resources...
Center for Space Construction Third Annual Symposium
NASA Technical Reports Server (NTRS)
1991-01-01
Viewgraphs from presentations given at the symposium are presented. The topics covered include the following: orbital assembly, large space structures, space stations, expert systems, lunar regolith and structure mechanics, lunar shelter construction from lunar resources, telerobotic rovers, lunar construction equipment, lunar based equipment, and lunar construction.
48 CFR 252.246-7003 - Notification of Potential Safety Issues.
Code of Federal Regulations, 2013 CFR
2013-10-01
.... Critical safety item means a part, subassembly, assembly, subsystem, installation equipment, or support... impact for systems, or subsystems, assemblies, subassemblies, or parts integral to a system, acquired by... the extent known at the time of notification; (iv) A point of contact to coordinate problem analysis...
48 CFR 252.246-7003 - Notification of Potential Safety Issues.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... Critical safety item means a part, subassembly, assembly, subsystem, installation equipment, or support... impact for systems, or subsystems, assemblies, subassemblies, or parts integral to a system, acquired by... the extent known at the time of notification; (iv) A point of contact to coordinate problem analysis...
48 CFR 252.246-7003 - Notification of Potential Safety Issues.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... Critical safety item means a part, subassembly, assembly, subsystem, installation equipment, or support... impact for systems, or subsystems, assemblies, subassemblies, or parts integral to a system, acquired by... the extent known at the time of notification; (iv) A point of contact to coordinate problem analysis...
48 CFR 252.246-7003 - Notification of Potential Safety Issues.
Code of Federal Regulations, 2012 CFR
2012-10-01
.... Critical safety item means a part, subassembly, assembly, subsystem, installation equipment, or support... impact for systems, or subsystems, assemblies, subassemblies, or parts integral to a system, acquired by... the extent known at the time of notification; (iv) A point of contact to coordinate problem analysis...
48 CFR 252.246-7003 - Notification of Potential Safety Issues.
Code of Federal Regulations, 2014 CFR
2014-10-01
.... Critical safety item means a part, subassembly, assembly, subsystem, installation equipment, or support... impact for systems, or subsystems, assemblies, subassemblies, or parts integral to a system, acquired by... the extent known at the time of notification; (iv) A point of contact to coordinate problem analysis...
30 CFR 7.301 - Purpose and effective date.
Code of Federal Regulations, 2010 CFR
2010-07-01
... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Electric Motor Assemblies § 7.301 Purpose... explosion-proof electric motor assemblies intended for use in approved equipment in underground mines... requirements of this part. Those motors that incorporate features not specifically addressed in this subpart...
Alignment and assembly process for primary mirror subsystem of a spaceborne telescope
NASA Astrophysics Data System (ADS)
Lin, Wei-Cheng; Chang, Shenq-Tsong; Chang, Sheng-Hsiung; Chang, Chen-Peng; Lin, Yu-Chuan; Chin, Chi-Chieh; Pan, Hsu-Pin; Huang, Ting-Ming
2015-11-01
In this study, a multispectral spaceborne Cassegrain telescope was developed. The telescope was equipped with a primary mirror with a 450-mm clear aperture composed of Zerodur and lightweighted at a ratio of approximately 50% to meet both thermal and mass requirements. Reducing the astigmatism was critical for this mirror. The astigmatism is caused by gravity effects, the bonding process, and deformation from mounting the main structure of the telescope (main plate). This article presents the primary mirror alignment, mechanical ground-supported equipment (MGSE), assembly process, and optical performance test used to assemble the primary mirror. A mechanical compensated shim is used as the interface between the bipod flexure and main plate. The shim was used to compensate for manufacturer errors found in components and differences between local coplanarity errors to prevent stress while the bipod flexure was screwed to the main plate. After primary mirror assembly, an optical performance test method called a bench test with an algorithm was used to analyze the astigmatism caused by the gravity effect and deformation from the mounting or supporter. The tolerance conditions for the primary mirror assembly require the astigmatism caused by gravity and mounting force deformation to be less than P-V 0.02 λ at 632.8 nm. The results demonstrated that the designed MGSE used in the alignment and assembly processes met the critical requirements for the primary mirror assembly of the telescope.
Mixed Oxide Fresh Fuel Package Auxiliary Equipment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yapuncich, F.; Ross, A.; Clark, R.H.
2008-07-01
The United States Department of Energy's National Nuclear Security Administration (NNSA) is overseeing the construction the Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF) on the Savannah River Site. The new facility, being constructed by NNSA's contractor Shaw AREVA MOX Services, will fabricate fuel assemblies utilizing surplus plutonium as feedstock. The fuel will be used in designated commercial nuclear reactors. The MOX Fresh Fuel Package (MFFP), which has recently been licensed by the Nuclear Regulatory Commission (NRC) as a type B package (USA/9295/B(U)F-96), will be utilized to transport the fabricated fuel assemblies from the MFFF to the nuclear reactors. It wasmore » necessary to develop auxiliary equipment that would be able to efficiently handle the high precision fuel assemblies. Also, the physical constraints of the MFFF and the nuclear power plants require that the equipment be capable of loading and unloading the fuel assemblies both vertically and horizontally. The ability to reconfigure the load/unload evolution builds in a large degree of flexibility for the MFFP for the handling of many types of both fuel and non fuel payloads. The design and analysis met various technical specifications including dynamic and static seismic criteria. The fabrication was completed by three major fabrication facilities within the United States. The testing was conducted by Sandia National Laboratories. The unique design specifications and successful testing sequences will be discussed. (authors)« less
Code of Federal Regulations, 2013 CFR
2013-01-01
... SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of New... owners are eligible to receive U.S. ATP certificates for equipment produced or assembled in the United States or in a foreign country. (b) Foreign owners are eligible to receive U.S. ATP certificates only for...
Code of Federal Regulations, 2014 CFR
2014-01-01
... SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of New... owners are eligible to receive U.S. ATP certificates for equipment produced or assembled in the United States or in a foreign country. (b) Foreign owners are eligible to receive U.S. ATP certificates only for...
Code of Federal Regulations, 2012 CFR
2012-01-01
... SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of New... owners are eligible to receive U.S. ATP certificates for equipment produced or assembled in the United States or in a foreign country. (b) Foreign owners are eligible to receive U.S. ATP certificates only for...
DOT National Transportation Integrated Search
1981-02-01
Extensive material substitution and resizing of the domestic automotive fleet, as well as the introduction of new technologies, will require major changes in the techniques and equipment used in the various manufacturing processes employed in the pro...
46 CFR 28.880 - Hydraulic equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... hydraulic equipment and the adjacent work area. Protection shall be afforded to the operator of hydraulic... personnel. (h) Nonmetallic flexible hose assemblies must only be used between two points of relative motion... (method). (j) Nonmetallic flexible hose shall be marked with the manufacturer's name or trademark, type or...
ERIC Educational Resources Information Center
Moore, Pam
2008-01-01
Fluid power technicians, sometimes called hydraulic and pneumatic technicians, work with equipment that utilizes the pressure of a liquid or gas in a closed container to transmit, multiply, or control power. Working under the supervision of an engineer or engineering staff, they assemble, install, maintain, and test fluid power equipment.…
NASA Technical Reports Server (NTRS)
1972-01-01
The assembly drawings of the receiver unit are presented for the data compression/error correction digital test system. Equipment specifications are given for the various receiver parts, including the TV input buffer register, delta demodulator, TV sync generator, memory devices, and data storage devices.
75 FR 2894 - Withdrawal of Regulatory Guide 1.148
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-19
... Valve Assemblies in Systems Important to Safety in Nuclear Power Plants.'' FOR FURTHER INFORMATION... for Active Valve Assemblies in Systems Important to Safety in Nuclear Power Plants.'' RG 1.148 was... qualifying active mechanical equipment used in nuclear power plants. The NRC is withdrawing RG 1.148 because...
29 CFR 1910.305 - Wiring methods, components, and equipment for general use.
Code of Federal Regulations, 2010 CFR
2010-07-01
... distribution center. (B) Conductors shall be run as multiconductor cord or cable assemblies. However, if... persons, feeders may be run as single insulated conductors. (v) The following requirements apply to branch... shall be multiconductor cord or cable assemblies or open conductors. If run as open conductors, they...
29 CFR 1910.305 - Wiring methods, components, and equipment for general use.
Code of Federal Regulations, 2011 CFR
2011-07-01
... distribution center. (B) Conductors shall be run as multiconductor cord or cable assemblies. However, if... persons, feeders may be run as single insulated conductors. (v) The following requirements apply to branch... shall be multiconductor cord or cable assemblies or open conductors. If run as open conductors, they...
29 CFR 1910.305 - Wiring methods, components, and equipment for general use.
Code of Federal Regulations, 2013 CFR
2013-07-01
... distribution center. (B) Conductors shall be run as multiconductor cord or cable assemblies. However, if... persons, feeders may be run as single insulated conductors. (v) The following requirements apply to branch... shall be multiconductor cord or cable assemblies or open conductors. If run as open conductors, they...
29 CFR 1910.305 - Wiring methods, components, and equipment for general use.
Code of Federal Regulations, 2014 CFR
2014-07-01
... distribution center. (B) Conductors shall be run as multiconductor cord or cable assemblies. However, if... persons, feeders may be run as single insulated conductors. (v) The following requirements apply to branch... shall be multiconductor cord or cable assemblies or open conductors. If run as open conductors, they...
29 CFR 1910.305 - Wiring methods, components, and equipment for general use.
Code of Federal Regulations, 2012 CFR
2012-07-01
... distribution center. (B) Conductors shall be run as multiconductor cord or cable assemblies. However, if... persons, feeders may be run as single insulated conductors. (v) The following requirements apply to branch... shall be multiconductor cord or cable assemblies or open conductors. If run as open conductors, they...
49 CFR 572.199 - Pelvis iliac.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 7 2011-10-01 2011-10-01 false Pelvis iliac. 572.199 Section 572.199... Dummy, Small Adult Female § 572.199 Pelvis iliac. (a) The iliac is part of the lower torso assembly... assembled dummy (drawing 180-0000). The dummy is equipped with a laterally oriented pelvis accelerometer as...
49 CFR 572.199 - Pelvis iliac.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Pelvis iliac. 572.199 Section 572.199... Dummy, Small Adult Female § 572.199 Pelvis iliac. (a) The iliac is part of the lower torso assembly... assembled dummy (drawing 180-0000). The dummy is equipped with a laterally oriented pelvis accelerometer as...
49 CFR 572.199 - Pelvis iliac.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 7 2012-10-01 2012-10-01 false Pelvis iliac. 572.199 Section 572.199... Dummy, Small Adult Female § 572.199 Pelvis iliac. (a) The iliac is part of the lower torso assembly... assembled dummy (drawing 180-0000). The dummy is equipped with a laterally oriented pelvis accelerometer as...
NASA Technical Reports Server (NTRS)
Nelson, N. W.
1975-01-01
The application of NASTRAN to the design of a fluid solids unit plenum/cyclone/dipleg assembly is described. The major loads considered are thermal, pressure, and gravity. Such applications are of interest in the petroleum industry since the equipment described is historically critical.
40 CFR 63.4481 - Am I subject to this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... recreational vehicles (including camping trailers and fifth wheels). This subcategory also includes the... attachment to an on-road vehicle on an original equipment manufacturer's (OEM) assembly line. The assembled... and products performed on-site at installations owned or operated by the Armed Forces of the United...
40 CFR 63.4481 - Am I subject to this subpart?
Code of Federal Regulations, 2012 CFR
2012-07-01
... recreational vehicles (including camping trailers and fifth wheels). This subcategory also includes the... attachment to an on-road vehicle on an original equipment manufacturer's (OEM) assembly line. The assembled... and products performed on-site at installations owned or operated by the Armed Forces of the United...
40 CFR 63.4481 - Am I subject to this subpart?
Code of Federal Regulations, 2010 CFR
2010-07-01
... recreational vehicles (including camping trailers and fifth wheels). This subcategory also includes the... attachment to an on-road vehicle on an original equipment manufacturer's (OEM) assembly line. The assembled... and products performed on-site at installations owned or operated by the Armed Forces of the United...
40 CFR 63.4481 - Am I subject to this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
... recreational vehicles (including camping trailers and fifth wheels). This subcategory also includes the... attachment to an on-road vehicle on an original equipment manufacturer's (OEM) assembly line. The assembled... and products performed on-site at installations owned or operated by the Armed Forces of the United...
40 CFR 63.4481 - Am I subject to this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
... recreational vehicles (including camping trailers and fifth wheels). This subcategory also includes the... attachment to an on-road vehicle on an original equipment manufacturer's (OEM) assembly line. The assembled... and products performed on-site at installations owned or operated by the Armed Forces of the United...
Copper vapor laser modular packaging assembly
Alger, Terry W.; Ault, Earl R.; Moses, Edward I.
1992-01-01
A modularized packaging arrangement for one or more copper vapor lasers and associated equipment is disclosed herein. This arrangement includes a single housing which contains the laser or lasers and all their associated equipment except power, water and neon, and means for bringing power, water, and neon which are necessary to the operation of the lasers into the container for use by the laser or lasers and their associated equipment.
Copper vapor laser modular packaging assembly
Alger, T.W.; Ault, E.R.; Moses, E.I.
1992-12-01
A modularized packaging arrangement for one or more copper vapor lasers and associated equipment is disclosed herein. This arrangement includes a single housing which contains the laser or lasers and all their associated equipment except power, water and neon, and means for bringing power, water, and neon which are necessary to the operation of the lasers into the container for use by the laser or lasers and their associated equipment. 2 figs.
preAssemble: a tool for automatic sequencer trace data processing.
Adzhubei, Alexei A; Laerdahl, Jon K; Vlasova, Anna V
2006-01-17
Trace or chromatogram files (raw data) are produced by automatic nucleic acid sequencing equipment or sequencers. Each file contains information which can be interpreted by specialised software to reveal the sequence (base calling). This is done by the sequencer proprietary software or publicly available programs. Depending on the size of a sequencing project the number of trace files can vary from just a few to thousands of files. Sequencing quality assessment on various criteria is important at the stage preceding clustering and contig assembly. Two major publicly available packages--Phred and Staden are used by preAssemble to perform sequence quality processing. The preAssemble pre-assembly sequence processing pipeline has been developed for small to large scale automatic processing of DNA sequencer chromatogram (trace) data. The Staden Package Pregap4 module and base-calling program Phred are utilized in the pipeline, which produces detailed and self-explanatory output that can be displayed with a web browser. preAssemble can be used successfully with very little previous experience, however options for parameter tuning are provided for advanced users. preAssemble runs under UNIX and LINUX operating systems. It is available for downloading and will run as stand-alone software. It can also be accessed on the Norwegian Salmon Genome Project web site where preAssemble jobs can be run on the project server. preAssemble is a tool allowing to perform quality assessment of sequences generated by automatic sequencing equipment. preAssemble is flexible since both interactive jobs on the preAssemble server and the stand alone downloadable version are available. Virtually no previous experience is necessary to run a default preAssemble job, on the other hand options for parameter tuning are provided. Consequently preAssemble can be used as efficiently for just several trace files as for large scale sequence processing.
Mobile Centers For Secondary Power Distribution
NASA Technical Reports Server (NTRS)
Mears, Robert L.
1990-01-01
Concept for distribution of 60-Hz ac power in large building devoted to assembly and testing of equipment improves safety, reduces number of outlets and lengthy cables, and readily accommodates frequent changes in operations and configuration. Power from floor recess fed via unobtrusive cable to portable power management center. A cart containing variety of outlets and circuit breakers, wheeled to convenient location near equipment to be assembled or tested. Power distribution system presents larger range of operational configurations than fixed location. Meets tighter standards to feed computers and delicate instruments. Industrial-grade power suitable for power tools and other hardware. Three-phase and single-phase outlets available from each.
Corona And Ultraviolet Equipment For Testing Materials
NASA Technical Reports Server (NTRS)
Laue, Eric G.
1993-01-01
Two assemblies of laboratory equipment developed for use in testing abilities of polymers, paints, and other materials to withstand ultraviolet radiation and charged particles. One is vacuum ultraviolet source built around commercial deuterium lamp. Other exposes specimen in partial vacuum to both ultraviolet radiation and brush corona discharge. Either or both assemblies used separately or together to simulate approximately combination of solar radiation and charged particles encountered by materials aboard spacecraft in orbit around Earth. Also used to provide rigorous environmental tests of materials exposed to artificial ultraviolet radiation and charged particles in industrial and scientific settings or to natural ultraviolet radiation and charged particles aboard aircraft at high altitudes.
NASA Technical Reports Server (NTRS)
1999-01-01
Marshall Space Flight Center (MSFC) has developed a specially-designed nut, called the Quick-Connect Nut, for quick and easy assembly of components in the harsh environment of space, as in assembly of International Space Station. The design permits nuts to be installed simply by pushing them onto standard bolts, then giving a quick twist. To remove, they are unscrewed like conventional nuts. Possible applications include the mining industry for erecting support barriers, assembling underwater oil drilling platforms, fire-fighting equipment, scaffolding, assembly-line machinery, industrial cranes, and even changing lug nuts on race cars. The speed of assembly can make the difference between life and death in different aspects of life on Earth.
1999-10-12
Marshall Space Flight Center (MSFC) has developed a specially-designed nut, called the Quick-Connect Nut, for quick and easy assembly of components in the harsh environment of space, as in assembly of International Space Station. The design permits nuts to be installed simply by pushing them onto standard bolts, then giving a quick twist. To remove, they are unscrewed like conventional nuts. Possible applications include the mining industry for erecting support barriers, assembling underwater oil drilling platforms, fire-fighting equipment, scaffolding, assembly-line machinery, industrial cranes, and even changing lug nuts on race cars. The speed of assembly can make the difference between life and death in different aspects of life on Earth.
Code of Federal Regulations, 2011 CFR
2011-01-01
... welds with substantial amounts of repetition of layout. The equipment, components and piping systems are... fully fluorinated hydrocarbon polymers. 1. Assemblies and components especially designed or prepared for use in gaseous diffusion enrichment. 1.1 Gaseous Diffusion Barriers Especially designed or prepared...
Code of Federal Regulations, 2012 CFR
2012-01-01
... welds with substantial amounts of repetition of layout. The equipment, components and piping systems are... fully fluorinated hydrocarbon polymers. 1. Assemblies and components especially designed or prepared for use in gaseous diffusion enrichment. 1.1 Gaseous Diffusion Barriers Especially designed or prepared...
Code of Federal Regulations, 2014 CFR
2014-01-01
... welds with substantial amounts of repetition of layout. The equipment, components and piping systems are... fully fluorinated hydrocarbon polymers. 1. Assemblies and components especially designed or prepared for use in gaseous diffusion enrichment. 1.1 Gaseous Diffusion Barriers Especially designed or prepared...
Code of Federal Regulations, 2013 CFR
2013-01-01
... welds with substantial amounts of repetition of layout. The equipment, components and piping systems are... fully fluorinated hydrocarbon polymers. 1. Assemblies and components especially designed or prepared for use in gaseous diffusion enrichment. 1.1 Gaseous Diffusion Barriers Especially designed or prepared...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-01
... comments were received, please enclose a stamped, self-addressed postcard with the comments. Note that all... Control Rearward Displacement, 205 Glazing Materials, 207 Seating Systems, 210 Seat Belt Assembly... the vehicle is not already so equipped. Standard No. 209 Seat Belt Assemblies: Inspection of seat...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-26
... wish to receive confirmation that your comments were received, please enclose a stamped, self-addressed... Belt Assemblies, 210 Seat Belt Assembly Anchorages, 212 Windshield Mounting, 214 Side Impact Protection... standard. The petitioner also stated that the vehicles are equipped with self-tensioning combination lap...
Code of Federal Regulations, 2013 CFR
2013-01-01
... control the flow within the cascade: (1) Separation nozzles and assemblies. Especially designed or... fluids. (10) Special shut-off and control valves. Especially designed or prepared manual or automated... assemblies. Especially designed or prepared vortex tubes that are cylindrical or tapered, made of or...
Code of Federal Regulations, 2014 CFR
2014-01-01
... control the flow within the cascade: (1) Separation nozzles and assemblies. Especially designed or... fluids. (10) Special shut-off and control valves. Especially designed or prepared manual or automated... assemblies. Especially designed or prepared vortex tubes that are cylindrical or tapered, made of or...
Code of Federal Regulations, 2012 CFR
2012-01-01
... control the flow within the cascade: (1) Separation nozzles and assemblies. Especially designed or... fluids. (10) Special shut-off and control valves. Especially designed or prepared manual or automated... assemblies. Especially designed or prepared vortex tubes that are cylindrical or tapered, made of or...
NASA Technical Reports Server (NTRS)
Hecht, Michael; Carsey, Frank
2005-01-01
The subsurface ice probe (SIPR) is a proposed apparatus that would bore into ice to depths as great as hundreds of meters by melting the ice and pumping the samples of meltwater to the surface. Originally intended for use in exploration of subsurface ice on Mars and other remote planets, the SIPR could also be used on Earth as an alternative to coring, drilling, and melting apparatuses heretofore used to sample Arctic and Antarctic ice sheets. The SIPR would include an assembly of instrumentation and electronic control equipment at the surface, connected via a tether to a compact assembly of boring, sampling, and sensor equipment in the borehole (see figure). Placing as much equipment as possible at the surface would help to attain primary objectives of minimizing power consumption, sampling with high depth resolution, and unobstructed imaging of the borehole wall. To the degree to which these requirements would be satisfied, the SIPR would offer advantages over the aforementioned ice-probing systems.
Root-Contact/Pressure-Plate Assembly For Hydroponic System
NASA Technical Reports Server (NTRS)
Morris, Carlton E.; Loretan, Philip A.; Bonsi, Conrad K.; Hill, Walter A.
1994-01-01
Hydroponic system includes growth channels equipped with rootcontact/pressure-plate assemblies. Pump and associated plumbing circulate nutrient liquid from reservoir, along bottom of growth channels, and back to reservoir. Root-contact/pressure-plate assembly in each growth channel stimulates growth of roots by applying mild contact pressure. Flat plate and plate connectors, together constitute pressure plate, free to move upward to accommodate growth of roots. System used for growing sweetpotatoes and possibly other tuber and root crops.
Design and implementation of a compliant robot with force feedback and strategy planning software
NASA Technical Reports Server (NTRS)
Premack, T.; Strempek, F. M.; Solis, L. A.; Brodd, S. S.; Cutler, E. P.; Purves, L. R.
1984-01-01
Force-feedback robotics techniques are being developed for automated precision assembly and servicing of NASA space flight equipment. Design and implementation of a prototype robot which provides compliance and monitors forces is in progress. Computer software to specify assembly steps and makes force feedback adjustments during assembly are coded and tested for three generically different precision mating problems. A model program demonstrates that a suitably autonomous robot can plan its own strategy.
Automated assembly of Gallium Arsenide and 50-micron thick silicon solar cell modules
NASA Technical Reports Server (NTRS)
Mesch, H. G.
1984-01-01
The TRW automated solar array assembly equipment was used for the module assembly of 300 GaAs solar cells and 300 50 micron thick silicon solar cells (2 x 4 cm in size). These cells were interconnected with silver plated Invar tabs by means of welding. The GaAs cells were bonded to Kapton graphite aluminum honeycomb graphite substrates and the thin silicon cells were bonded to 0.002 inch thick single layer Kapton substrates. The GaAs solar cell module assembly resulted in a yield of 86% and the thin cell assembly produced a yield of 46% due to intermittent sticking of weld electrodes during the front cell contact welding operation. (Previously assembled thin cell solar modules produced an overall assembly yield of greater than 80%).
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-20
..., LLC, Subsidiary of Mag Industrial Automation Systems, Machesney Park, IL; Notice of Negative... automation equipment and machine tools did not contribute to worker separations at the subject facility and...' firm's declining customers. The survey revealed no imports of automation equipment and machine tools by...
Little Masquerade: Russia’s Evolving Employment Of Maskirovka
2016-05-26
formations and equipment. Camouflage and radar scattering nets, awnings, screens, and smoke are additional means to prevent observation and detection.30...light discipline, engagement restrictions ( fire discipline), and communication restrictions.31...same inert techniques but augments them with real equipment, soldiers, smoke , sounds, and light signatures.33 Creation of a false assembly area with
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-17
... Airworthiness Directives; Various Aircraft Equipped With Rotax Aircraft Engines 912 A Series Engines AGENCY...: This Airworthiness Directive (AD) results from reports of cracks in the engine crankcase. Austro... crankcase assembly has permitted to reduce applicability of the new AD, when based on engines' serial...
Code of Federal Regulations, 2010 CFR
2010-10-01
... HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Specification for a Buoyant Vest, Unicellular Polyethylene Foam, Adult and Child § 160... and 115 pounds for a child size for 10 minutes at ambient temperatures without breaking or distorting...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Plans. 159.005-12 Section 159.005-12 Shipping COAST...: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Approval Procedures § 159.005-12 Plans. (a) Each set of plans under § 159.005-9(a)(5)(ii) for equipment must include the following: (1) An assembly...
ERIC Educational Resources Information Center
Gugerty, John, Comp.; And Others
Intended to assist in the vocational education and employment of individuals who are handicapped, this catalog contains descriptions and illustrations of modified tools, equipment, and machinery for use in 38 areas. These use areas are arts, assembly, assessment, automobile repair, benchwork, communication, computer processing, cosmetology,…
Zirconium Recycle Test Equipment for Hot Cell Operations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Collins, Emory D.; DelCul, Guillermo Daniel; Spencer, Barry B.
2015-01-30
The equipment components and assembly support work were modified for optimized, remote hot cell operations to complete this milestone. The modifications include installation of a charging door, Swagelok connector for the off-gas line between the reactor and condenser, and slide valve installation to permit attachment/replacement of the product salt collector bottle.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-25
... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-72,971] ASC Machine Tools, Inc... workers and former workers of ASC Machine Tools, Inc., Spokane Valley, Washington (the subject firm). The... cut metal, including assembled equipment, component parts of equipment, and spare parts. The negative...
Assembly line performance and modeling
NASA Astrophysics Data System (ADS)
Rane, Arun B.; Sunnapwar, Vivek K.
2017-09-01
Automobile sector forms the backbone of manufacturing sector. Vehicle assembly line is important section in automobile plant where repetitive tasks are performed one after another at different workstations. In this thesis, a methodology is proposed to reduce cycle time and time loss due to important factors like equipment failure, shortage of inventory, absenteeism, set-up, material handling, rejection and fatigue to improve output within given cost constraints. Various relationships between these factors, corresponding cost and output are established by scientific approach. This methodology is validated in three different vehicle assembly plants. Proposed methodology may help practitioners to optimize the assembly line using lean techniques.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carvo, Alan E.
Between the mid-1970s and the mid-1980s Sandia National Laboratory constructed eleven experimental assemblies to simulate debris beds formed in a sodium-cooled fast breeder reactor. All but one of the assemblies were irradiated. The experimental assemblies were transferred to the Idaho National Laboratory (INL) in 2007 and 2008 for storage, dismantlement, recovery of the uranium for reuse in the nuclear fuel cycle, and disposal of unneeded materials. This paper addresses the effort to dismantle the assemblies down to the primary containment vessel and repackage them for temporary storage until such time as equipment necessary for sodium separation is in place.
Trace Contaminant Control During the International Space Station's On-Orbit Assembly and Outfitting
NASA Technical Reports Server (NTRS)
Perry, J. L.
2017-01-01
Achieving acceptable cabin air quality must balance competing elements during spacecraft design, assembly, ground processing, and flight operations. Among the elements that contribute to the trace chemical contaminant load and, therefore, the cabin air quality aboard crewed spacecraft are the vehicle configuration, crew size and activities, mission duration and objectives, materials selection, and vehicle manufacturing and preflight ground processing methods. Trace chemical contaminants produced from pervasive sources such as equipment offgassing, human metabolism, and cleaning fluids during preflight ground processing present challenges to maintaining acceptable cabin air quality. To address these challenges, both passive and active contamination control techniques are used during a spacecraft's design, manufacturing, preflight preparation, and operational phases. Passive contamination control methods seek to minimize the equipment offgassing load by selecting materials, manufacturing processes, preflight preparation processes, and in-flight operations that have low chemical offgassing characteristics. Passive methods can be employed across the spacecraft's entire life cycle from conceptual design through flight operations. However, because the passive contamination control techniques cannot fully eliminate the contaminant load, active contamination control equipment must be deployed aboard the spacecraft to purify and revitalize the cabin atmosphere during in-flight operations. Verifying that the passive contamination control techniques have successfully maintained the total trace contaminant load within the active contamination control equipment's capabilities occurs late in the preflight preparation stages. This verification consists of subjecting the spacecraft to an offgassing test to determine the trace contaminant load. This load is then assessed versus the active contamination control equipment's capabilities via trace contaminant control (TCC) engineering analysis. During the International Space Station's (ISS's) on-orbit assembly and outfitting, a series of engineering analyses were conducted to evaluate how effective the passive TCC methods were relative to providing adequate operational margin for the active TCC equipment's capabilities aboard the ISS. These analyses were based on habitable module and cargo vehicle offgassing test results. The offgassing test for a fully assembled module or cargo vehicle is an important preflight spacecraft evaluation method that has been used successfully during all crewed spacecraft programs to provide insight into how effectively the passive contamination control methods limit the equipment offgassing component of the overall trace contaminant generation load. The progression of TCC assessments beginning in 1998 with the ISS's first habitable element launch and continuing through the final pressurized element's arrival in 2010 are presented. Early cargo vehicle flight assessments between 2008 and 2011 are also presented as well as a discussion on predictive methods for assessing cargo via a purely analytical technique. The technical approach for TCC employed during this 13-year period successfully maintained the cabin atmospheric quality within specified parameters during the technically challenging ISS assembly and outfitting stages. The following narrative provides details on the important role of spacecraft offgassing testing, trace contaminant performance requirements, and flight rules for achieving the ultimate result-a cabin environment that enables people to live and work safely in space.
Low profile, high load vertical rolling positioning stage
Shu, Deming; Barraza, Juan
1996-01-01
A stage or support platform assembly for use in a synchrotron accurately positions equipment to be used in the beam line of the synchrotron. The support platform assembly includes an outer housing in which is disposed a lifting mechanism having a lifting platform or stage at its upper extremity on which the equipment is mounted. A worm gear assembly is located in the housing and is adapted to raise and lower a lifting shaft that is fixed to the lifting platform by an anti-binding connection. The lifting platform is moved vertically as the lifting shaft is moved vertically. The anti-binding connection prevents the shaft from rotating with respect to the platform, but does permit slight canting of the shaft with respect to the lifting platform so as to eliminate binding and wear due to possible tolerance mismatches. In order to ensure that the lifting mechanism does not move in a horizontal direction as it is moved vertically, at least three linear roller bearing assemblies are arranged around the outer-periphery of the lifting mechanism. One of the linear roller bearing assemblies can be adjusted so that the roller bearings apply a loading force against the lifting mechanism. Alternatively, a cam mechanism can be used to provide such a loading force.
Multiplexed Energy Coupler for Rotating Equipment
NASA Technical Reports Server (NTRS)
Zhao, Xiaoliang
2011-01-01
A multiplexing antenna assembly can efficiently couple AC signal/energy into, or out of, rotating equipment. The unit only passes AC energy while blocking DC energy. Concentric tubes that are sliced into multiple pieces are assembled together so that, when a piece from an outer tube aligns well with an inner tube piece, efficient energy coupling is achieved through a capacitive scheme. With N outer pieces and M inner pieces, an effective N x M combination can be achieved in a multiplexed manner. The energy coupler is non-contact, which is useful if isolation from rotating and stationary parts is required. Additionally, the innovation can operate in high temperatures. Applications include rotating structure sensing, non-contact energy transmission, etc.
7 CFR 1755.501 - Definitions applicable to §§ 1755.501 through 1755.510.
Code of Federal Regulations, 2011 CFR
2011-01-01
... travel use built on or permanently attached to a self-propelled motor vehicle chassis or on a chassis cab... the FCC rules in 47 CFR part 68. NID. Network interface device. Primary station protector. An assembly... and determined that: (1) Final assembly or manufacture of the equipment is completed in the United...
36 CFR 1234.12 - What are the fire safety requirements that apply to records storage facilities?
Code of Federal Regulations, 2011 CFR
2011-07-01
... structural elements and construction assemblies must be in accordance with ASTM E 119-98 (incorporated by... necessary, they must be protected by self-closing or automatic Class A fire doors, or equivalent doors that... such areas with 4-hour rated construction assemblies. (p) Equipment rows running perpendicular to the...
Code of Federal Regulations, 2011 CFR
2011-07-01
...) refrigerant to be returned to a refrigerant reclamation facility that will process it to the appropriate ARI... and Assembly Processes (Process FMEA) and Effects Analysis for Machinery (Machinery FMEA). SAE... Manufacturing and Assembly Processes (Process FMEA), and Potential Failure Mode and Effects Analysis for...
Code of Federal Regulations, 2013 CFR
2013-07-01
...) refrigerant to be returned to a refrigerant reclamation facility that will process it to the appropriate ARI... and Assembly Processes (Process FMEA) and Effects Analysis for Machinery (Machinery FMEA). SAE... Manufacturing and Assembly Processes (Process FMEA), and Potential Failure Mode and Effects Analysis for...
Code of Federal Regulations, 2012 CFR
2012-07-01
...) refrigerant to be returned to a refrigerant reclamation facility that will process it to the appropriate ARI... and Assembly Processes (Process FMEA) and Effects Analysis for Machinery (Machinery FMEA). SAE... Manufacturing and Assembly Processes (Process FMEA), and Potential Failure Mode and Effects Analysis for...
Code of Federal Regulations, 2010 CFR
2010-07-01
...) refrigerant to be returned to a refrigerant reclamation facility that will process it to the appropriate ARI... and Assembly Processes (Process FMEA) and Effects Analysis for Machinery (Machinery FMEA). SAE... Manufacturing and Assembly Processes (Process FMEA), and Potential Failure Mode and Effects Analysis for...
Code of Federal Regulations, 2014 CFR
2014-07-01
...) refrigerant to be returned to a refrigerant reclamation facility that will process it to the appropriate ARI... and Assembly Processes (Process FMEA) and Effects Analysis for Machinery (Machinery FMEA). SAE... Manufacturing and Assembly Processes (Process FMEA), and Potential Failure Mode and Effects Analysis for...
Third generation design solar cell module LSA task 5, large scale production
NASA Technical Reports Server (NTRS)
1980-01-01
A total of twelve (12) preproduction modules were constructed, tested, and delivered. A concept to the frame assembly was designed and proven to be quite reliable. This frame design, as well as the rest of the assembly, was designed with future high volume production and the use of automated equipment in mind.
2014-01-24
Interfacial Tuning via Electron-Blocking/Hole-Transport Layers and Indium Tin Oxide Surface Treatment in Bulk- Heterojunction Organic Photovoltaic Cells...devices Figure 3 shows the compounds we prepared to assemble on gold (Au) surfaces. Results of TPA-C60 dyads (1 and 2) self-assembled on Au electrodes...surface hydroxyl groups, respectively, we decided to prepare compounds 5-7 to attach as SAMs, see Figure 5. Difficulties and unexpected problems
High Resolution Imager (HRI) for the Roentgen Satellite (ROSAT) definition study
NASA Technical Reports Server (NTRS)
1983-01-01
The design of the high resolution imager (HRI) on HEAO 2 was modified for use in the instrument complement of the Roentgen Satellite (ROSAT). Mechanical models of the front end assembly, central electronics assembly, and detector assembly were used to accurately represent the HRI envelope for both fit checks and focal plane configuration studies. The mechanical and electrical interfaces were defined and the requirements for electrical ground support equipment were established. A summary description of the ROSAT telescope and mission is included.
An overview of the EASE/ACCESS space construction demonstration
NASA Technical Reports Server (NTRS)
Levin, George M.; Ross, Jerry L.; Spring, Sherwood C.
1988-01-01
Consideration is given to the development of the Experimental Assembly of Structures in EVA/Assembly Concept for Construction of Erectable Space Structures (EASE/ACCESS) space construction demonstration, which was performed during Space Shuttle mission 61-B. The mission equipment is described and illustrated and the EASE/ACCESS mission management structure is outlined. Simulations of the assembly and disassembly in the NASA neutral buoyancy simulators were used to test the mission plans. In addition, EVA training and crew performance for the mission are discussed.
The purpose of this SOP is to describe the preparation and assembly of materials and samplers to go into the field for use during the Arizona NHEXAS project and the "Border" study. Keywords: field; equipment.
The National Human Exposure Assessment Survey (NHEXAS) is a federal i...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-12
... Airworthiness Directives; Airbus Model A330-243F Airplanes Equipped With Rolls Royce Trent 700 Series Engines... Branch, ANM-116, Transport Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, Washington 98057... assemblies and along the beam structure of the right and left engine thrust reversers, detailed inspection...
10-MWe solar-thermal central-receiver pilot plant. Operating and maintenance manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-08-01
Information required to perform the initial program loading and operation of the Heliostat Array Controller (HAC) is provided. Operating activities are described as required for heliostat control. All computer console command steps, from power up to power down are described. Detailed steps are provided to wake up the system and direct heliostat beams to standby, on target, standby to stow and power down. Maintenance requirements (preventive and corrective), reparability (reparable - non-reparable decisions), spares identification, spares storage location, replacement levels, replacement location and repair location are established. Individual system breakdown block diagrams are provided for each system/assembly/subassembly. Maintenance and repairmore » description sheets are provided for each maintenance significant item. The manual provides support of the following equipment: (a) helostat assembly; (b) heliostat control assembly; and (c) maintenance and installation equipment. The safety requirements for the operating and maintenance functions are established. These procedures will assist in eliminating or controlling the accident potentials caused by human error, environment, or component malfunctions or interactions that could result in major injury or fatality to operating or visiting personnel, or damage to subsystem components or support equipment. These procedures are for normal and test operating conditions and emergency situations, and apply to all Martin Marietta Corporation, governmental, operating and visitor personnel. (LEW)« less
NASA Technical Reports Server (NTRS)
1979-01-01
Program elements of the power module (PM) system, are identified, structured, and defined according to the planned work breakdown structure. Efforts required to design, develop, manufacture, test, checkout, launch and operate a protoflight assembled 25 kW, 50 kW and 100 kW PM include the preparation and delivery of related software, government furnished equipment, space support equipment, ground support equipment, launch site verification software, orbital verification software, and all related data items.
Large space telescope, phase A. Volume 3: Optical telescope assembly
NASA Technical Reports Server (NTRS)
1972-01-01
The development and characteristics of the optical telescope assembly for the Large Space Telescope are discussed. The systems considerations are based on mission-related parameters and optical equipment requirements. Information is included on: (1) structural design and analysis, (2) thermal design, (3) stabilization and control, (4) alignment, focus, and figure control, (5) electronic subsystem, and (6) scientific instrument design.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-21
... identification on their self-certification label on each piece of motor vehicle glazing. As part of that... manufacturer but is not required. FMVSS No. 209, ``Seat belt assemblies,'' requires safety belts to be labeled... sheet (S4.1(k)). Seat belt assemblies installed as original equipment in new motor vehicles need not be...
Manufacturing Laboratory for Next Generation Engineers
2013-12-16
automated CNC machines, rapid prototype systems, robotic assembly systems, metrology , and non-traditional systems such as a waterjet cutter, EDM machine...CNC machines, rapid prototype systems, robotic assembly systems, metrology , and non-traditional systems such as a waterjet cutter, EDM machine, plasma...System Metrology and Quality Control Equipment - This area already had a CMM and other well known quality control instrumentation. It has been enhanced
A&M. TAN607 second floor plan for cold assembly area. Metallurgical ...
A&M. TAN-607 second floor plan for cold assembly area. Metallurgical lab, chemistry lab, nuclear instrument lab, equipment rooms. Ralph M. Parsons 902-ANP-607-A 102. Date: December 1952. Approved by INEEL Classification Office for public release. INEEL index code no. 034-0607-693-106754 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
ERIC Educational Resources Information Center
Human Engineering Inst., Cleveland, OH.
THIS MODULE OF A 25-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE SERVICING PROCEDURES FOR THE CONTROL SYSTEM OF A SPECIFIC TRANSMISSION USED ON DIESEL POWERED EQUIPMENT. TOPICS ARE EXAMINING THE CONTROL COVER ASSEMBLY, REGULATING VALVE AND SAFETY VALVE, AND INSPECTING THE SYSTEM. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL…
Acoustic vibration test detects intermittent electrical discontinuities
NASA Technical Reports Server (NTRS)
Grieve, S. M.; Roberts, D. E.
1970-01-01
Nondestructive test method detects faulty electrical connections in inaccessible or hidden portions of electronic harness assemblies and connectors. Method employs readily available commercial equipment.
Advantages of High Tolerance Measurements in Fusion Environments Applying Photogrammetry
DOE Office of Scientific and Technical Information (OSTI.GOV)
T. Dodson, R. Ellis, C. Priniski, S. Raftopoulos, D. Stevens, M. Viola
2009-02-04
Photogrammetry, a state-of-the-art technique of metrology employing digital photographs as the vehicle for measurement, has been investigated in the fusion environment. Benefits of this high tolerance methodology include relatively easy deployment for multiple point measurements and deformation/distortion studies. Depending on the equipment used, photogrammetric systems can reach tolerances of 25 microns (0.001 in) to 100 microns (0.004 in) on a 3-meter object. During the fabrication and assembly of the National Compact Stellarator Experiment (NCSX) the primary measurement systems deployed were CAD coordinate-based computer metrology equipment and supporting algorithms such as both interferometer-aided (IFM) and absolute distance measurementbased (ADM) laser trackers,more » as well as portable Coordinate Measurement Machine (CMM) arms. Photogrammetry was employed at NCSX as a quick and easy tool to monitor coil distortions incurred during welding operations of the machine assembly process and as a way to reduce assembly downtime for metrology processes.« less
16. Perimeter acquisition radar building room #102, electrical equipment room; ...
16. Perimeter acquisition radar building room #102, electrical equipment room; the prime power distribution system. Excellent example of endulum-types shock isolation. The grey cabinet and barrel assemble is part of the polychlorinated biphenyl (PCB) retrofill project - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND
Space Construction Automated Fabrication Experiment Definition Study (SCAFEDS), part 2
NASA Technical Reports Server (NTRS)
1978-01-01
The techniques, processes, and equipment required for automatic fabrication and assembly of structural elements in using Shuttle as a launch vehicle, and construction were defined. Additional construction systems operational techniques, processes, and equipment which can be developed and demonstrated in the same program to provide further risk reduction benefits to future large space systems were identified and examined.
Code of Federal Regulations, 2014 CFR
2014-01-01
... ATP. 3300.64 Section 3300.64 Agriculture Regulations of the Department of Agriculture (Continued... FOODSTUFFS AND ON THE SPECIAL EQUIPMENT TO BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND... party to the ATP. Application for certification shall be submitted to the ATP manager by an officer in...
Code of Federal Regulations, 2012 CFR
2012-01-01
... ATP. 3300.64 Section 3300.64 Agriculture Regulations of the Department of Agriculture (Continued... FOODSTUFFS AND ON THE SPECIAL EQUIPMENT TO BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND... party to the ATP. Application for certification shall be submitted to the ATP manager by an officer in...
Code of Federal Regulations, 2013 CFR
2013-01-01
... ATP. 3300.64 Section 3300.64 Agriculture Regulations of the Department of Agriculture (Continued... FOODSTUFFS AND ON THE SPECIAL EQUIPMENT TO BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND... party to the ATP. Application for certification shall be submitted to the ATP manager by an officer in...
The purpose of this SOP is to describe the preparation and assembly of materials and samplers to go into the field for use during the Arizona NHEXAS project and the Border study. Keywords: field; equipment.
The U.S.-Mexico Border Program is sponsored by the Environmental Health...
Space shuttle EVA/IVA support equipment requirements study. Volume 1: Final summary report
NASA Technical Reports Server (NTRS)
1973-01-01
A study was conducted to determine the support equipment requirements for space shuttle intravehicular and extravehicular activities. The subjects investigated are; (1) EVA/IVA task identification and analysis,. (2) primary life support system, (3) emergency life support system, (4) pressure suit assembly, (5) restraints, (6) work site provision, (7) emergency internal vehicular emergencies, and (8) vehicular interfaces.
Code of Federal Regulations, 2010 CFR
2010-10-01
... HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Specification for a Buoyant Vest, Unicellular Plastic Foam, Adult and Child § 160.052-3a... must be attached to a support and bear 150 pounds for an adult size and 115 pounds for a child size for...
1986-12-05
and road building equipment manufactured by the Martin Heavy Engineering Plants, economic production unit [VHJ], one of our major suppliers, the...equipped with health care facilities, their major advantage is that they can be rapidly assembled and disassembled even under demanding field conditions... major crude oil pipelines. In the Seventh 5-Year Plan the Czechoslovak Freight Car Works, concern enterprise, in Poprad manufactured numerous BMPNS
Instruction manual model 600F, data transmission test set
NASA Technical Reports Server (NTRS)
1972-01-01
Information necessary for the operation and maintenance of the Model 600F Data Transmission Test Set is presented. A description is contained of the physical and functional characteristics; pertinent installation data; instructions for operating the equipment; general and detailed principles of operation; preventive and corrective maintenance procedures; and block, logic, and component layout diagrams of the equipment and its major component assemblies.
NASA Astrophysics Data System (ADS)
1980-10-01
Specifications are given for the shipping, marking, inspection, testing, and start up of equipment to be used in a proposed wood fuel cogeneration system in Maine. Couplings, mechanical drives, electric motors, spare parts, coatings, assembling, and materials handling and packaging are covered. Both OSHA and noise control regulations are included along with the ASME code.
NASA Astrophysics Data System (ADS)
Springer, D. W.
Bell Helicopter Textron, Incorporated (BHTI) installed two Digital Equipment Corporation PDP-11 computers and an American Can Inc. Ink Jet printer in 1980 as the cornerstone of the Wire Harness Automated Manufacturing System (WHAMS). WHAMS is based upon the electrical assembly philosophy of continuous filament harness forming. This installation provided BHTI with a 3 to 1 return-on-investment by reducing wire and cable identification cycle time by 80 percent and harness forming, on dedicated layout tooling, by 40 percent. Yet, this improvement in harness forming created a bottle neck in connector assembly. To remove this bottle neck, BHTI has installed a prototype connector assembly cell that integrates the WHAMS' data base and innovative computer technologies to cut harness connector assembly cycle time. This novel connector assembly cell uses voice recognition, laser identification, and animated computer graphics to help the electrician in the correct assembly of harness connectors.
Automated solar panel assembly line
NASA Technical Reports Server (NTRS)
Somberg, H.
1981-01-01
The initial stage of the automated solar panel assembly line program was devoted to concept development and proof of approach through simple experimental verification. In this phase, laboratory bench models were built to demonstrate and verify concepts. Following this phase was machine design and integration of the various machine elements. The third phase was machine assembly and debugging. In this phase, the various elements were operated as a unit and modifications were made as required. The final stage of development was the demonstration of the equipment in a pilot production operation.
Hirschfeld, Tomas B.
1985-01-01
A nonsaturable microdryer is provided for electrolytically removing moisture from sealed containers, particularly electronic equipment. An electrode/electrolyte assembly is disposed within a channel between the interior and exterior of a sealed container. A catalytic barrier disposed between the interior of the sealed container and the electrode/electrolyte assembly prevents the build-up of explosive concentrations of hydrogen by converting back-diffusing hydrogen and oxygen back into water, which is then recycled. A semipermeable membrane disposed between the exterior of the sealed container and the electrode/electrolyte assembly allows selective removal of hydrogen and prevents intake of water.
Hirschfeld, T.B.
1984-05-23
A nonsaturable microdryer is provided for electrolytically removing moisture from sealed containers, particularly electronic equipment. An electrode/electrolyte assembly is disposed within a channel between the interior and exterior of a sealed container. A catalytic barrier disposed between the interior of the sealed container and the electrode/electrolyte assembly prevents the build-up of explosive concentrations of hydrogen by converting back-diffusing hydrogen and oxygen back into water, which is then recycled. A semipermeable membrane disposed between the exterior of the sealed container and the electrode/electrolyte assembly allows selective removal of hydrogen and prevents intake of water.
Development of a Hand Held Thromboelastograph
2015-01-01
documents will be referenced during the Entegrion PCM System design, verification and validation activities. EN 61010 -1:2010 (Edition3.0) Safety...requirements for electrical equipment for measurement, control, and laboratory use – Part 1: General requirements. EN 61010 -2-101:2002 Safety...IPC-A-610E Acceptability of Electronic Assemblies IPC 7711/21B Rework, Modification and Repair of Electronic Assemblies. IEC 62304:2006/AC:2008
Technological Advances in Joining
1981-08-01
automotive industry, and similar robots are being equipped to perform many arc welding functions in areas where high production rates must be...nonvacuum electron-beam welding favor the use of this process by the automotive industry. For example, this process has been used to join the component...metal additions were not needed. This process has been also used to weld various assemblies for automotive transmissions (e.g., annulus gear assemblies
Code of Federal Regulations, 2014 CFR
2014-10-01
... instruments of closure for buoyant vests. 160.052-3a Section 160.052-3a Shipping COAST GUARD, DEPARTMENT OF... LIFESAVING EQUIPMENT Specification for a Buoyant Vest, Unicellular Plastic Foam, Adult and Child § 160.052-3a Materials—Dee ring and snap hook assemblies and other instruments of closure for buoyant vests. (a...
Code of Federal Regulations, 2011 CFR
2011-10-01
... instruments of closure for buoyant vests. 160.060-3a Section 160.060-3a Shipping COAST GUARD, DEPARTMENT OF... LIFESAVING EQUIPMENT Specification for a Buoyant Vest, Unicellular Polyethylene Foam, Adult and Child § 160.060-3a Materials—Dee ring and snap hook assemblies and other instruments of closure for buoyant vests...
Code of Federal Regulations, 2013 CFR
2013-10-01
... instruments of closure for buoyant vests. 160.060-3a Section 160.060-3a Shipping COAST GUARD, DEPARTMENT OF... LIFESAVING EQUIPMENT Specification for a Buoyant Vest, Unicellular Polyethylene Foam, Adult and Child § 160.060-3a Materials—Dee ring and snap hook assemblies and other instruments of closure for buoyant vests...
Code of Federal Regulations, 2013 CFR
2013-10-01
... instruments of closure for buoyant vests. 160.052-3a Section 160.052-3a Shipping COAST GUARD, DEPARTMENT OF... LIFESAVING EQUIPMENT Specification for a Buoyant Vest, Unicellular Plastic Foam, Adult and Child § 160.052-3a Materials—Dee ring and snap hook assemblies and other instruments of closure for buoyant vests. (a...
Code of Federal Regulations, 2012 CFR
2012-10-01
... instruments of closure for buoyant vests. 160.060-3a Section 160.060-3a Shipping COAST GUARD, DEPARTMENT OF... LIFESAVING EQUIPMENT Specification for a Buoyant Vest, Unicellular Polyethylene Foam, Adult and Child § 160.060-3a Materials—Dee ring and snap hook assemblies and other instruments of closure for buoyant vests...
Code of Federal Regulations, 2014 CFR
2014-10-01
... instruments of closure for buoyant vests. 160.060-3a Section 160.060-3a Shipping COAST GUARD, DEPARTMENT OF... LIFESAVING EQUIPMENT Specification for a Buoyant Vest, Unicellular Polyethylene Foam, Adult and Child § 160.060-3a Materials—Dee ring and snap hook assemblies and other instruments of closure for buoyant vests...
Code of Federal Regulations, 2011 CFR
2011-10-01
... instruments of closure for buoyant vests. 160.052-3a Section 160.052-3a Shipping COAST GUARD, DEPARTMENT OF... LIFESAVING EQUIPMENT Specification for a Buoyant Vest, Unicellular Plastic Foam, Adult and Child § 160.052-3a Materials—Dee ring and snap hook assemblies and other instruments of closure for buoyant vests. (a...
Code of Federal Regulations, 2012 CFR
2012-10-01
... instruments of closure for buoyant vests. 160.052-3a Section 160.052-3a Shipping COAST GUARD, DEPARTMENT OF... LIFESAVING EQUIPMENT Specification for a Buoyant Vest, Unicellular Plastic Foam, Adult and Child § 160.052-3a Materials—Dee ring and snap hook assemblies and other instruments of closure for buoyant vests. (a...
Jiang, Chao; Luo, Caijun; Liu, Xiaolin; Shao, Lei; Dong, Youqing; Zhang, Yingwei; Shi, Feng
2015-05-27
The layer-by-layer (LbL) assembled multilayer has been widely used as good barrier film or capsule due to the advantages of its flexible tailoring of film permeability and compactness. Although many specific systems have been proposed for film design, developing a versatile strategy to control film compactness remains a challenge. We introduced the simple mechanical energy of a high gravity field to the LbL assembly process to tailor the multilayer permeability through adjusting film compactness. By taking poly(diallyldimethylammonium chloride) (PDDA) and poly{1-4[4-(3-carboxy-4-hydroxyphenylazo)benzenesulfonamido]-1,2-ethanediyl sodium salt} (PAzo) as a model system, we investigated the LbL assembly process under a high gravity field. The results showed that the high gravity field introduced effectively accelerated the multilayer deposition process by 20-fold compared with conventional dipping assembly; the adsorption rate was positively dependent on the rotating speed of the high gravity equipment and the concentration of the building block solutions. More interestingly, the film compactness of the PDDA/PAzo multilayer prepared under the high gravity field increased remarkably with the growing rotational speed of the high gravity equipment, as demonstrated through comparisons of surface morphology, cyclic voltammetry curves, and photoisomerization kinetics of PDDA/PAzo multilayers fabricated through the conventional dipping method and through LbL assembly under a high gravity field, respectively. In this way, we have introduced a simple and versatile external form of mechanical energy into the LbL assembling process to improve film compactness, which should be useful for further applications in controlled ion permeability, anticorrosion, and drug loading.
Geosynchronous platform definition study. Volume 5: Geosynchronous platform synthesis
NASA Technical Reports Server (NTRS)
1973-01-01
The development is described of the platform configurations, support subsystems, mission equipment, and servicing concepts. A common support module is developed; subsystem concepts are traded off; data relay, TDRS, earth observational, astro-physics, and advanced navigation and traffic control mission equipment concepts are postulated; and ancillary equipment required for delivery and on-orbit servicing interfaces with geosynchronous platforms is grossly defined. The general approach was to develop a platform concept capable of evolving through three on-orbit servicing modes: remote, EVA, and shirtsleeve. The definition of the equipment is to the assembly level. Weight, power, and volumetric data are compiled for all the platforms.
NASA Technical Reports Server (NTRS)
Appleberry, W. T.
1980-01-01
Rotary sequencer is assembled from conventional planetary differential gearset and latching mechanism utilizing inputs and outputs which are coaxial. Applications include automated production-line equipment in home appliances and in vehicles.
33 CFR 143.207 - Requirements for foreign MODUs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the International Maritime Organization (IMO, formerly Inter-Governmental Maritime Consultative Organization or IMCO) (IMO) Code for Construction and Equipment of Mobile Offshore Drilling Units (IMO Assembly...
Communication Satellite Payload Special Check out Equipment (SCOE) for Satellite Testing
NASA Astrophysics Data System (ADS)
Subhani, Noman
2016-07-01
This paper presents Payload Special Check out Equipment (SCOE) for the test and measurement of communication satellite Payload at subsystem and system level. The main emphasis of this paper is to demonstrate the principle test equipment, instruments and the payload test matrix for an automatic test control. Electrical Ground Support Equipment (EGSE)/ Special Check out Equipment (SCOE) requirements, functions and architecture for C-band and Ku-band payloads are presented in details along with their interface with satellite during different phases of satellite testing. It provides test setup, in a single rack cabinet that can easily be moved from payload assembly and integration environment to thermal vacuum chamber all the way to launch site (for pre-launch test and verification).
Code of Federal Regulations, 2010 CFR
2010-10-01
... HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Specification for a Buoyant Vest, Kapok or Fibrous Glass, Adult and Child § 160.047-3a... must be attached to a support and bear 150 pounds for an adult size and 115 pounds for a child size for...
In Touch with Industry. ICAF Industry Studies 1999
1999-01-01
Plant , Hamtramck, MI General Motors Corporation, Warren, MI General Motors Technical Center, Warren, MI General Motors Truck Assembly Plant , Pontiac...indicate that they cannot modernize plant equipment because workers lack the necessary skills to operate more advanced equipment. The National...construct new plants . General Motors is using M&S in new car designs to replace the clumsy clay models previously used. Now, when GM is making design
Preliminary Design Guide for Arctic Equipment
1989-05-01
areas that need to be addressed. The components of the various assemblies that Metals , plastics and elastomers make up the subject piece of equipment...polyester elastomer . Allow sufficient length for contraction (- 10- in./in, per IF). Do not allow long, unsup- ported lengths of hose . Lubricants Viscosity...this compressed air cools upon several manufacturers offer teflon hoses with expansion and contact with a cold surface, the braided stainless steel
Construction method of pre assembled unit of bolt sphere grid
NASA Astrophysics Data System (ADS)
Hu, L. W.; Guo, F. L.; Wang, J. L.; Bu, F. M.
2018-03-01
The traditional construction of bolt sphere grid has many disadvantages, such as high cost, large amount of work at high altitude and long construction period, in order to make up for these shortcomings, in this paper, a new and applicable construction method is explored: setting up local scaffolding, installing the bolt sphere grid starting frame on the local scaffolding, then the pre assembled unit of bolt sphere grid is assembled on the ground, using small hoisting equipment to lift pre assembled unit to high altitude and install. Compared with the traditional installation method, the construction method has strong practicability and high economic efficiency, and has achieved good social and economic benefits.
A User Modelling Approach for Computer-Based Critiquing
1990-01-01
example a CAD/CAM system). Com- puters are good for simulating in circumstances where training on the actual equip- 13 ment (for example a power plant or...system. It is an environment in which simulated devices, such as steam plant controllers, can be assembled and operated. Students can assemble a...Con- cordia hypermedia system, graphics can be integrated easily. Concordia is a hy- permedia development and presentation system available on the
Controlling Corrosion in Defence Equipment - Technical Meeting,
1985-10-01
methods identify elements. (c) IR absorption spectroscopy. % e The identifies radicals, sometimes compounds. X-ray fluorescence and atomic absorption ...components from this radio. There were 100 sets all with defective - silver plating, with a total value of $5 million. A method of refurbishment was...Assemblies from the FiiC Aircraft Slides of a corroded heat exchanger assembly were shown. A method of refurbishment was suggested. Estimated saving - $0.5
2014-09-04
They included two Force Projection Technology (FPT) diesel driven pumping assemblies of 350 and 600 gallons per minute (GPM), and the Advanced...Army Tank Automotive Research Development and Engineering Center (TARDEC). They included two Force Projection Technology (FPT) diesel driven...research programs. The first two systems identified were Force Projection Technology (FPT) diesel -driven pumping assemblies of 350 and 600 gallons per
Code of Federal Regulations, 2014 CFR
2014-10-01
... instruments of closure for buoyant vests. 160.047-3a Section 160.047-3a Shipping COAST GUARD, DEPARTMENT OF... LIFESAVING EQUIPMENT Specification for a Buoyant Vest, Kapok or Fibrous Glass, Adult and Child § 160.047-3a Materials—Dee ring and snap hook assemblies and other instruments of closure for buoyant vests. (a...
Code of Federal Regulations, 2012 CFR
2012-10-01
... instruments of closure for buoyant vests. 160.047-3a Section 160.047-3a Shipping COAST GUARD, DEPARTMENT OF... LIFESAVING EQUIPMENT Specification for a Buoyant Vest, Kapok or Fibrous Glass, Adult and Child § 160.047-3a Materials—Dee ring and snap hook assemblies and other instruments of closure for buoyant vests. (a...
Code of Federal Regulations, 2011 CFR
2011-10-01
... instruments of closure for buoyant vests. 160.047-3a Section 160.047-3a Shipping COAST GUARD, DEPARTMENT OF... LIFESAVING EQUIPMENT Specification for a Buoyant Vest, Kapok or Fibrous Glass, Adult and Child § 160.047-3a Materials—Dee ring and snap hook assemblies and other instruments of closure for buoyant vests. (a...
Code of Federal Regulations, 2013 CFR
2013-10-01
... instruments of closure for buoyant vests. 160.047-3a Section 160.047-3a Shipping COAST GUARD, DEPARTMENT OF... LIFESAVING EQUIPMENT Specification for a Buoyant Vest, Kapok or Fibrous Glass, Adult and Child § 160.047-3a Materials—Dee ring and snap hook assemblies and other instruments of closure for buoyant vests. (a...
NASA Astrophysics Data System (ADS)
Seha, S.; Zamberi, J.; Fairu, A. J.
2017-10-01
Material handling system (MHS) is an important part for the productivity plant and has recognized as an integral part of today’s manufacturing system. Currently, MHS has growth tremendously with its technology and equipment type. Based on the case study observation, the issue involving material handling system contribute to the reduction of production efficiency. This paper aims to propose a new design of integration between material handling and manufacturing layout by investigating the influences of layout and material handling system. A method approach tool using Delmia Quest software is introduced and the simulation result is used to assess the influences of the integration between material handling system and manufacturing layout in the performance of automotive assembly line. The result show, the production of assembly line output increases more than 31% from the current system. The source throughput rate average value went up to 252 units per working hour in model 3 and show the effectiveness of the pick-to-light system as efficient storage equipment. Thus, overall result shows, the application of AGV and the pick-to-light system gave a large significant effect in the automotive assembly line. Moreover, the change of layout also shows a large significant improvement to the performance.
Ragland, Natalie H; Miedel, Emily L; Gomez, Jose M; Engelman, Robert W
2017-11-01
Vaporized hydrogen peroxide (VHP) is used to decontaminate clinical, biocontainment, and research animal rooms and equipment. To assist with its implementation in a murine facility, we developed a safe and effective method of VHP sterilization of IVC racks and air handling units (AHU). Safety of VHP decontamination was assessed by ensuring VHP levels dissipated to less than 1 ppm in the room prior to personnel reentry and inside the primary enclosure prior to the return of mice; this condition occurred at least 18 h after the VHP cycle. Efficacy of VHP sterilization was assessed by using chemical indicators, biologic indicators, and PCR testing for Staphylococcus xylosus, a commensal organism of murine skin and an opportunistic pathogen, which was present in 160 of 172 (93%) of specimens from occupied IVC racks and the interior surfaces of in-use AHU. Neither mechanized washing nor hand-sanitizing eradicated S. xylosus from equipment airway interiors, with 17% to 24% of specimens remaining PCR-positive for S. xylosus. 'Static-open' VHP exposure of sanitized equipment did not ensure its sterilization. In contrast, 'active-closed' VHP exposure, in which IVC racks were assembled, sealed, and connected to AHU set to the VHP cycle, increased the proportion of chemical indicators that detected sterilizing levels of VHP inside the assembled equipment, and significantly decreased PCR-detectable S. xylosus inside the equipment. Supplementing bulk steam sterilization of the primary enclosure with VHP sterilization of the secondary housing equipment during room change-outs may help to mitigate opportunistic agents that jeopardize studies involving immunodeficient strains.
1980-02-06
Space Shuttle Orbiter Enterprise mated to an external fuel tank and two solid rocket boosters on top of a Mobil Launcher Platform, undergoes fit and function checks at the launch site for the first Space Shuttle at Launch Complex 39's Pad A. The dummy Space Shuttle was assembled in the Vehicle Assembly Building and rolled out to the launch site on May 1 as part of an exercise to make certain shuttle elements are compatible with the Spaceport's assembly and launch facilities and ground support equipment, and help clear the way for the launch of the Space Shuttle Orbiter Columbia.
1980-02-06
SPACE SHUTTLE ORBITER ENTERPRISE MATED TO AN EXTERNAL FUEL TANK AND TWO SOLID ROCKET BOOSTERS ON TOP OF A MOBIL LAUNCHER PLATFORM, UNDERGOES FIT AND FUNCTION CHECKS AT THE LAUNCH SITE FOR THE FIRST SPACE SHUTTLE AT LAUNCH COMPLEX 39'S PAD A. THE DUMMY SPACE SHUTTLE WAS ASSEMBLED IN THE VEHICLE ASSEMBLY BUILDING AND ROLLED OUT TO THE LAUNCH SITE ON MAY 1 AS PART OF AN EXERCISE TO MAKE CERTAIN SHUTTLE ELEMENTS ARE COMPATIBLE WITH THE SPACEPORT'S ASSEMBLY AND LAUNCH FACILITIES AND GROUND SUPPORT EQUIPMENT, AND HELP CLEAR THE WAY FOR THE LAUNCH OF THE SPACE SHUTTLE ORBITER COLUMBIA.
1980-02-06
SPACE SHUTTLE ORBITER ENTERPRISE MATED TO AN EXTERNAL FUEL TANK AND TWO SOLID ROCKET BOOSTERS ON TOP OF A MOBIL LAUNCHER PLATFORM, UNDERGOES FIT AND FUNCTION CHECKS AT THE LAUNCH SITE FOR THE FIRST SPACE SHUTTLE AT LAUNCH COMPLEX 39'S PAD A. THE DUMMY SPACE SHUTTLE WAS ASSEMBLED IN THE VEHICLE ASSEMBLY BUILDING AND ROLLED OUT TO THE LAUNCH SITE ON MAY 1 AS PART OF AN EXERCISE TO MAKE CERTAIN SHUTTLE ELEMENTS ARE COMPATIBLE WITH THE SPACEPORT'S ASSEMBLY AND LAUNCH FACILITIES AND GROUND SUPPORT EQUIPMENT, AND HELP CLEAR THE WAY FOR THE LAUNCH OF THE SPACE SHUTTLE ORBITER COLUMBIA.
Closeup view of the Solid Rocket Booster (SRB) Forward Skirt ...
Close-up view of the Solid Rocket Booster (SRB) Forward Skirt sitting on ground support equipment in the Solid Rocket Booster Assembly and Refurbishment Facility at Kennedy Space Center while being prepared for mating with the Frustum-Nose Cap Assembly and the Forward Rocket Motor Segment. The prominent feature in this view is the electrical, data, telemetry and safety systems terminal which connects to the Aft Skirt Assembly systems via the Systems Tunnel that runs the length of the Rocket Motor. - Space Transportation System, Solid Rocket Boosters, Lyndon B. Johnson Space Center, 2101 NASA Parkway, Houston, Harris County, TX
Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration
NASA Technical Reports Server (NTRS)
Greene, William D.
2013-01-01
System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.
Scale Factor and Noise Performance Tests of the Bendix Corporation Rate Gyro Assembly (RGA).
1980-08-01
tiltmeters , seismometers, and an ambient temperature monitor. 3.2 Test Support Equipment Bendix supplied all necessary test support equipment and...001A 2-Axis Tiltmeter Electrotechnical Lab EV22C Portable Seismic Mon- itor (PRM) Sensors USAF Sieler Laboratory PSM Electronics Rockland 816...acquisition system recorded the tiltmeter , seismometer, and temperature data on magnetic tape. The seismic, tilt, and temperature information was filtered
2004-03-05
KENNEDY SPACE CENTER, FLA. - At the SRB Assembly and Refurbishment Facility, STS-114 Mission Specialists Stephen Robinson and Wendy Lawrence look at a test panel of insulation material cut in a liquid nitrogen process. The STS-114 crew is at KSC for familiarization with Shuttle and mission equipment. The mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment, plus the external stowage platform, to the International Space Station.
2006-04-25
KENNEDY SPACE CENTER, FLA. - STS-121 Commander Steven Lindsey (left) and Mission Specialist Piers Sellers (right) are removing a cover on the trailing umbilical assembly at the SPACEHAB facility in Cape Canaveral during a Crew Equipment Interface Test. This test allows the astronauts to become familiar with equipment they will be using on their upcoming mission. STS-121 is scheduled to launch in July aboard Space Shuttle Discovery. Photo credit: NASA/Kim Shiflett
Skylab astronaut life support assembly
NASA Technical Reports Server (NTRS)
Brown, J. T.
1972-01-01
A comparative study was performed to define an optimum portable life support system for suited operations inside and outside the Skylab Program. Emphasis was placed on utilization of qualified equipment, modified versions of qualified equipment, and new systems made up to state-of-the-art components. Outlined are the mission constraints, operational modes, and evaluation ground rules by which the Skylab portable life support system was selected and the resulting design.
Detecting short circuits during assembly
NASA Technical Reports Server (NTRS)
Deboo, G. J.
1980-01-01
Detector circuit identifies shorts between bus bars of electronic equipment being wired. Detector sounds alarm and indicates which planes are shorted. Power and ground bus bars are scanned continuously until short circuit occurs.
46 CFR 160.151-45 - Equipment required for servicing facilities.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., or other pressure-measurement device or pressure gauge of equivalent accuracy and sensitivity; (j) Thermometer; (k) Barometer, aneroid or mercury; (l) Calibrated torque-wrench for assembling the inflation...
46 CFR 160.151-45 - Equipment required for servicing facilities.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., or other pressure-measurement device or pressure gauge of equivalent accuracy and sensitivity; (j) Thermometer; (k) Barometer, aneroid or mercury; (l) Calibrated torque-wrench for assembling the inflation...
Development of replicated optics for AXAF-1 XDA testing
NASA Technical Reports Server (NTRS)
Engelhaupt, Darell; Wilson, Michele; Martin, Greg
1995-01-01
Advanced optical systems for applications such as grazing incidence Wolter I x-ray mirror assemblies require extraordinary mirror surfaces in terms of fine finish and surface figure. The impeccable mirror surface is on the inside of the rotational mirror form. One practical method of producing devices with these requirements is to first fabricate an exterior surface for the optical device then replicate that surface to have the inverse component with lightweight characteristics. The replicated optic is not better than the master or mandrel from which it is made. This task identifies methods and materials for forming these extremely low roughness optical components. The objectives of this contract were to (1) prepare replication samples of electroless nickel coated aluminum, and determine process requirements for plating XDA test optic; (2) prepare and assemble plating equipment required to process a demonstration optic; (3) characterize mandrels, replicas and test samples for residual stress, surface contamination and surface roughness and figure using equipment at MSFC and; (4) provide technical expertise in establishing the processes, procedures, supplies and equipment needed to process the XDA test optics.
Component-Level Electronic-Assembly Repair (CLEAR) System Architecture
NASA Technical Reports Server (NTRS)
Oeftering, Richard C.; Bradish, Martin A.; Juergens, Jeffrey R.; Lewis, Michael J.; Vrnak, Daniel R.
2011-01-01
This document captures the system architecture for a Component-Level Electronic-Assembly Repair (CLEAR) capability needed for electronics maintenance and repair of the Constellation Program (CxP). CLEAR is intended to improve flight system supportability and reduce the mass of spares required to maintain the electronics of human rated spacecraft on long duration missions. By necessity it allows the crew to make repairs that would otherwise be performed by Earth based repair depots. Because of practical knowledge and skill limitations of small spaceflight crews they must be augmented by Earth based support crews and automated repair equipment. This system architecture covers the complete system from ground-user to flight hardware and flight crew and defines an Earth segment and a Space segment. The Earth Segment involves database management, operational planning, and remote equipment programming and validation processes. The Space Segment involves the automated diagnostic, test and repair equipment required for a complete repair process. This document defines three major subsystems including, tele-operations that links the flight hardware to ground support, highly reconfigurable diagnostics and test instruments, and a CLEAR Repair Apparatus that automates the physical repair process.
Learning high-quality soldering
NASA Technical Reports Server (NTRS)
Read, W. S.
1981-01-01
Soldering techniques for high-reliability electronic equipment are taught in 5 day course at NASA's Jet Propulsion Laboratory. Topic covered include new circuit assembly, printed-wiring board reworking, circuit changes, wire routing, and component installation.
Registration of surface structures using airborne focused ultrasound.
Sundström, N; Börjesson, P O; Holmer, N G; Olsson, L; Persson, H W
1991-01-01
A low-cost measuring system, based on a personal computer combined with standard equipment for complex measurements and signal processing, has been assembled. Such a system increases the possibilities for small hospitals and clinics to finance advanced measuring equipment. A description of equipment developed for airborne ultrasound together with a personal computer-based system for fast data acquisition and processing is given. Two air-adapted ultrasound transducers with high lateral resolution have been developed. Furthermore, a few results for fast and accurate estimation of signal arrival time are presented. The theoretical estimation models developed are applied to skin surface profile registrations.
Titan 3E/Centaur D-1T Systems Summary
NASA Technical Reports Server (NTRS)
1973-01-01
A systems and operational summary of the Titan 3E/Centaur D-1T program is presented which describes vehicle assembly facilities, launch facilities, and management responsibilities, and also provides detailed information on the following separate systems: (1) mechanical systems, including structural components, insulation, propulsion units, reaction control, thrust vector control, hydraulic systems, and pneumatic equipment; (2) astrionics systems, such as instrumentation and telemetry, navigation and guidance, C-Band tracking system, and range safety command system; (3) digital computer unit software; (4) flight control systems; (5) electrical/electronic systems; and (6) ground support equipment, including checkout equipment.
NASA Technical Reports Server (NTRS)
Witkin, S. A.
1976-01-01
Guidelines are presented for a quality assurance system to be implemented by the manufacturer in support of designing, developing, fabricating, assembling, inspecting, testing, handling, and delivery of equipment being procured for use in public urban mass transit systems. The guidelines apply to this equipment when being procured for: (1) use in revenue service; (2) demonstration of systems that will be revenue producing or used by the public; (3) use as a prototype for follow-on operational/revenue producing equipment procurements; and (4) qualification tests.
Free-floating dual-arm robots for space assembly
NASA Technical Reports Server (NTRS)
Agrawal, Sunil Kumar; Chen, M. Y.
1994-01-01
Freely moving systems in space conserve linear and angular momentum. As moving systems collide, the velocities get altered due to transfer of momentum. The development of strategies for assembly in a free-floating work environment requires a good understanding of primitives such as self motion of the robot, propulsion of the robot due to onboard thrusters, docking of the robot, retrieval of an object from a collection of objects, and release of an object in an object pool. The analytics of such assemblies involve not only kinematics and rigid body dynamics but also collision and impact dynamics of multibody systems. In an effort to understand such assemblies in zero gravity space environment, we are currently developing at Ohio University a free-floating assembly facility with a dual-arm planar robot equipped with thrusters, a free-floating material table, and a free-floating assembly table. The objective is to pick up workpieces from the material table and combine them into prespecified assemblies. This paper presents analytical models of assembly primitives and strategies for overall assembly. A computer simulation of an assembly is developed using the analytical models. The experiment facility will be used to verify the theoretical predictions.
30 CFR 18.10 - Notice of approval or disapproval.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES General... assembly of an electrical machine or accessory, MSHA will issue to the applicant either a written notice of...
Method and apparatus for extracting tritium and preparing radioactive waste for disposal
Heung, Leung K.
1994-01-01
Apparatus for heating an object such as a nuclear target bundle to release and recover hydrogen and contain the disposable residue for disposal. The apparatus comprises an inverted furnace, a sleeve/crucible assembly for holding and enclosing the bundle, conveying equipment for placing the sleeve onto the crucible and loading the bundle into the sleeve/crucible, a lift for raising the enclosed bundle into the furnace, and hydrogen recovery equipment including a trap and strippers, all housed in a containment having negative internal pressure. The crucible/sleeve assembly has an internal volume that is sufficient to enclose and hold the bundle before heating; the crucible's internal volume is sufficient by itself to hold and enclose the bundle's volume after heating. The crucible can then be covered and disposed of; the sleeve, on the other hand, can be reused.
NASA Technical Reports Server (NTRS)
1979-01-01
An array deployment assembly, power regulation and control assembly, the necessary interface, and display and control equipment comprise the power extension package (PEP) which is designed to provide increased power and duration, as well as reduce fuel cell cryogen consumption during Spacelab missions. Compatible with all currently defined missions and payloads, PEP imposes minimal weight and volume penalties on sortie missions, and can be installed and removed as needed at the launch site within the normal Orbiter turnaround cycle. The technology on which it is based consists of a modified solar electric propulsion array, standard design regulator and control equipment, and a minimally modified Orbiter design. The requirements from which PEP was derived, and the system and its performance capabilities are described. Features of the recommended project are presented.
Orbital construction support equipment
NASA Technical Reports Server (NTRS)
1977-01-01
Approximately 200 separate construction steps were defined for the three solar power satellite (SPS) concepts. Detailed construction scenarios were developed which describe the specific tasks to be accomplished, and identify general equipment requirements. The scenarios were used to perform a functional analysis, which resulted in the definition of 100 distinct SPS elements. These elements are the components, parts, subsystems, or assemblies upon which construction activities take place. The major SPS elements for each configuration are shown. For those elements, 300 functional requirements were identified in seven generic processes. Cumulatively, these processes encompass all functions required during SPS construction/assembly. Individually each process is defined such that it includes a specific type of activity. Each SPS element may involve activities relating to any or all of the generic processes. The processes are listed, and examples of the requirements defined for a typical element are given.
Design of fluidic self-assembly bonds for precise component positioning
NASA Astrophysics Data System (ADS)
Ramadoss, Vivek; Crane, Nathan B.
2008-02-01
Self Assembly is a promising alternative to conventional pick and place robotic assembly of micro components. Its benefits include parallel integration of parts with low equipment costs. Various approaches to self assembly have been demonstrated, yet demanding applications like assembly of micro-optical devices require increased positioning accuracy. This paper proposes a new method for design of self assembly bonds that addresses this need. Current methods have zero force at the desired assembly position and low stiffness. This allows small disturbance forces to create significant positioning errors. The proposed method uses a substrate assembly feature to provide a high accuracy alignment guide to the part. The capillary bond region of the part and substrate are then modified to create a non-zero positioning force to maintain the part in the desired assembly position. Capillary force models show that this force aligns the part to the substrate assembly feature and reduces sensitivity of part position to process variation. Thus, the new configuration can substantially improve positioning accuracy of capillary self-assembly. This will result in a dramatic decrease in positioning errors in the micro parts. Various binding site designs are analyzed and guidelines are proposed for the design of an effective assembly bond using this new approach.
Electromechanical Apparatus Measures Residual Stress
NASA Technical Reports Server (NTRS)
Chern, Engmin J.; Flom, Yury
1993-01-01
Nondestructive test exploits relationship between stress and eddy-current-probe resistance. Yields data on residual stress or strain in metal tension/compression specimen (stress or strain remaining in specimen when no stress applied from without). Apparatus is assembly of commercial equipment: tension-or-compression testing machine, eddy-current probe, impedance gain-and-phase analyzer measuring impedance of probe coil, and desktop computer, which controls other equipment and processes data received from impedance gain-and-phase analyzer.
A Primer for DoD Reliability, Maintainability, Safety, and Logistics Standards, 1992
1991-10-01
equipment, identified in the order of application (i.e., assembly, unit and system screens). Screening Strength ( SS ) - The probability that a screen...As’- ss equipment suitability for its intended operational environment. c. Verify contractual compliance. Each test method is divided into two...SIMULA-ITno Q.A. j FABRICATION, VALIDATION AD CONCERNS j PACKAGE AND SAnSFACTORY MBI Y QUALIMCATION RE UIREMENTS NO QRA TESTS YES QMLFOR TECHNOLOGY
2004-03-05
KENNEDY SPACE CENTER, FLA. - At the SRB Assembly and Refurbishment Facility, STS-114 crew members look at the booster separation motors (BSM) on a solid rocket booster aft skirt. The BSMs have had booster trowlable ablative removed by liquid nitrogen cutting. The STS-114 crew is at KSC for familiarization with Shuttle and mission equipment. The mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment, plus the external stowage platform, to the International Space Station.
2006-04-25
KENNEDY SPACE CENTER, FLA. - STS-121 Mission Specialist Piers Sellers (left) and Commander Steven Lindsey (right) are practicing removing the cover and strap on the trailing umbilical assembly at the SPACEHAB facility in Cape Canaveral during a Crew Equipment Interface Test. This test allows the astronauts to become familiar with equipment they will be using on their upcoming mission. STS-121 is scheduled to launch in July aboard Space Shuttle Discovery. Photo credit: NASA/Kim Shiflett
1970-01-01
This photograph was taken during assembly of the bottom and upper floors of the Skylab Orbital Workshop (OWS). The OWS was divided into two major compartments. The lower level provided crew accommodations for sleeping, food preparation and consumption, hygiene, waste processing and disposal, and performance of certain experiments. The upper level consisted of a large work area and housed water storage tanks, a food freezer, storage vaults for film, scientific airlocks, mobility and stability experiment equipment, and other experimental equipment.
Ragland, Natalie H; Miedel, Emily L; Gomez, Jose M; Engelman, Robert W
2017-01-01
Vaporized hydrogen peroxide (VHP) is used to decontaminate clinical, biocontainment, and research animal rooms and equipment. To assist with its implementation in a murine facility, we developed a safe and effective method of VHP sterilization of IVC racks and air handling units (AHU). Safety of VHP decontamination was assessed by ensuring VHP levels dissipated to less than 1 ppm in the room prior to personnel reentry and inside the primary enclosure prior to the return of mice; this condition occurred at least 18 h after the VHP cycle. Efficacy of VHP sterilization was assessed by using chemical indicators, biologic indicators, and PCR testing for Staphylococcus xylosus, a commensal organism of murine skin and an opportunistic pathogen, which was present in 160 of 172 (93%) of specimens from occupied IVC racks and the interior surfaces of in-use AHU. Neither mechanized washing nor hand-sanitizing eradicated S. xylosus from equipment airway interiors, with 17% to 24% of specimens remaining PCR-positive for S. xylosus. ‘Static–open’ VHP exposure of sanitized equipment did not ensure its sterilization. In contrast, ‘active–closed’ VHP exposure, in which IVC racks were assembled, sealed, and connected to AHU set to the VHP cycle, increased the proportion of chemical indicators that detected sterilizing levels of VHP inside the assembled equipment, and significantly decreased PCR-detectable S. xylosus inside the equipment. Supplementing bulk steam sterilization of the primary enclosure with VHP sterilization of the secondary housing equipment during room change-outs may help to mitigate opportunistic agents that jeopardize studies involving immunodeficient strains. PMID:29256369
Closeup view of the Solid Rocket Booster (SRB) Forward Skirt ...
Close-up view of the Solid Rocket Booster (SRB) Forward Skirt sitting on ground support equipment in the Solid Rocket Booster Assembly and Refurbishment Facility at Kennedy Space Center while being prepared for mating with the Frustum-Nose Cap Assembly and the Forward Rocket Motor Segment. The prominent feature in this view is the Forward Thrust Attach Fitting which mates up with the Forward Thrust Attach Fitting of the External Tank (ET) at the ends of the SRB Beam that runs through the ET's Inter Tank Assembly. - Space Transportation System, Solid Rocket Boosters, Lyndon B. Johnson Space Center, 2101 NASA Parkway, Houston, Harris County, TX
Influence of forces acting on side of machine on precision machining of large diameter holes
NASA Astrophysics Data System (ADS)
Fedorenko, M. A.; Bondarenko, J. A.; Sanina, T. M.
2018-03-01
One of the most important factors that increase efficiency, durability and reliability of rotating units is precision installation, preventive maintenance work, timely replacing of a failed or worn components and assemblies. These works should be carried out in the operation of the equipment, as the downtime in many cases leads to large financial losses. Stop of one unit of an industrial enterprise can interrupt the technological chain of production, resulting in a possible stop of the entire equipment. Improving the efficiency and optimization of the repair process increases accuracy of installation work when installing equipment, conducting restoration under operating conditions relevant for enterprises of different industries because it eliminates dismantling the equipment, sending it to maintenance, the expectation of equipment return, the new installation with the required quality and accuracy of repair.
40 CFR 1048.350 - What records must I keep?
Code of Federal Regulations, 2010 CFR
2010-07-01
... additional records: (1) A description of all test equipment for each test cell that you can use to test... production figures by maximum engine power, displacement, fuel type, or assembly plant (if you produce...
2008-04-29
An exhaust hood is necessary for binder removal. Cooling requires a fan at a second speed setpoint . Firing profiles need to be precisely...29,935.06 from Ohio match. Plasmalab 80 Plus Compact etching system (left) and heater/ chiller unit (right). CAHN TherMax 500 High Pressure TGA...the current research is aimed to optimize parameters of the structure, in order to improve the resonant properties of the periodic layered structures
Design of precise assembly equipment of large aperture optics
NASA Astrophysics Data System (ADS)
Pei, Guoqing; Xu, Xu; Xiong, Zhao; Yan, Han; Qin, Tinghai; Zhou, Hai; Yuan, Xiaodong
2017-05-01
High-energy solid-state laser is an important way to achieve laser fusion research. Laser fusion facility includes thousands of various types of large aperture optics. These large aperture optics should be assembled with high precision and high efficiency. Currently, however, the assembly of large aperture optics is by man's hand which is in low level of efficiency and labor-intensive. Here, according to the characteristics of the assembly of large aperture optics, we designed three kinds of grasping devices. Using Finite Element Method, we simulated the impact of the grasping device on the PV value and the RMS value of the large aperture optics. The structural strength of the grasping device's key part was analyzed. An experiment was performed to illustrate the reliability and precision of the grasping device. We anticipate that the grasping device would complete the assembly of large aperture optics precisely and efficiently.
Core assembly storage structure
Jones, Jr., Charles E.; Brunings, Jay E.
1988-01-01
A structure for the storage of core assemblies from a liquid metal-cooled nuclear reactor. The structure comprises an enclosed housing having a substantially flat horizontal top plate, a bottom plate and substantially vertical wall members extending therebetween. A plurality of thimble members extend downwardly through the top plate. Each thimble member is closed at its bottom end and has an open end adjacent said top plate. Each thimble member has a length and diameter greater than that of the core assembly to be stored therein. The housing is provided with an inlet duct for the admission of cooling air and an exhaust duct for the discharge of air therefrom, such that when hot core assemblies are placed in the thimbles, the heat generated will by convection cause air to flow from the inlet duct around the thimbles and out the exhaust duct maintaining the core assemblies at a safe temperature without the necessity of auxiliary powered cooling equipment.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Torella, JP; Lienert, F; Boehm, CR
2014-08-07
Recombination-based DNA construction methods, such as Gibson assembly, have made it possible to easily and simultaneously assemble multiple DNA parts, and they hold promise for the development and optimization of metabolic pathways and functional genetic circuits. Over time, however, these pathways and circuits have become more complex, and the increasing need for standardization and insulation of genetic parts has resulted in sequence redundancies-for example, repeated terminator and insulator sequences-that complicate recombination-based assembly. We and others have recently developed DNA assembly methods, which we refer to collectively as unique nucleotide sequence (UNS)-guided assembly, in which individual DNA parts are flanked withmore » UNSs to facilitate the ordered, recombination-based assembly of repetitive sequences. Here we present a detailed protocol for UNS-guided assembly that enables researchers to convert multiple DNA parts into sequenced, correctly assembled constructs, or into high-quality combinatorial libraries in only 2-3 d. If the DNA parts must be generated from scratch, an additional 2-5 d are necessary. This protocol requires no specialized equipment and can easily be implemented by a student with experience in basic cloning techniques.« less
NASA Technical Reports Server (NTRS)
Heard, Walter L., Jr.; Watson, Judith J.; Lake, Mark S.; Bush, Harold G.; Jensen, J. Kermit; Wallsom, Richard E.; Phelps, James E.
1992-01-01
Results are presented from a ground test program of an alternate mobile transporter (MT) concept and extravehicular activity (EVA) assembly procedure for the Space Station Freedom (SSF) truss keel. A three-bay orthogonal tetrahedral truss beam consisting of 44 2-in-diameter struts and 16 nodes was assembled repeatedly in neutral buoyancy by pairs of pressure-suited test subjects working from astronaut positioning devices (APD's) on the MT. The truss bays were cubic with edges 15 ft long. All the truss joint hardware was found to be EVA compatible. The average unit assembly time for a single pair of experienced test subjects was 27.6 sec/strut, which is about half the time derived from other SSF truss assembly tests. A concept for integration of utility trays during truss assembly is introduced and demonstrated in the assembly tests. The concept, which requires minimal EVA handling of the trays, is shown to have little impact on overall assembly time. The results of these tests indicate that by using an MT equipped with APD's, rapid EVA assembly of a space station-size truss structure can be expected.
Torella, Joseph P.; Lienert, Florian; Boehm, Christian R.; Chen, Jan-Hung; Way, Jeffrey C.; Silver, Pamela A.
2016-01-01
Recombination-based DNA construction methods, such as Gibson assembly, have made it possible to easily and simultaneously assemble multiple DNA parts and hold promise for the development and optimization of metabolic pathways and functional genetic circuits. Over time, however, these pathways and circuits have become more complex, and the increasing need for standardization and insulation of genetic parts has resulted in sequence redundancies — for example repeated terminator and insulator sequences — that complicate recombination-based assembly. We and others have recently developed DNA assembly methods that we refer to collectively as unique nucleotide sequence (UNS)-guided assembly, in which individual DNA parts are flanked with UNSs to facilitate the ordered, recombination-based assembly of repetitive sequences. Here we present a detailed protocol for UNS-guided assembly that enables researchers to convert multiple DNA parts into sequenced, correctly-assembled constructs, or into high-quality combinatorial libraries in only 2–3 days. If the DNA parts must be generated from scratch, an additional 2–5 days are necessary. This protocol requires no specialized equipment and can easily be implemented by a student with experience in basic cloning techniques. PMID:25101822
General view of the Space Shuttle Main Engine (SSME) assembly ...
General view of the Space Shuttle Main Engine (SSME) assembly with the expansion nozzle removed and resting on a cushioned mat on the floor of the SSME Processing Facility. The most prominent features in this view are the Low-pressure oxidizer Turbopump discharge Duct looping from the upper left side of the engine assembly to the lower left side of the assembly, the Low-Pressure Fuel Turbopump (LPFTP) is on the upper left of the assembly in this view and the LPFTP Discharge Duct loops from the upper left to upper right then turns back and down the assembly to the High-Pressure Fuel Turbopump on the lower right of the assembly. The Engine Controller and the Main fuel Valve Hydraulic Actuator are on the lower left portion of the assembly. The vertical rod that is in the approximate center of the engine assembly is a piece of ground support equipment call a Gimbal Actuator Replacement Strut which are used on the SSMEs when they are not installed in an orbiter. - Space Transportation System, Space Shuttle Main Engine, Lyndon B. Johnson Space Center, 2101 NASA Parkway, Houston, Harris County, TX
Results of EVA/mobile transporter space station truss assembly tests
NASA Technical Reports Server (NTRS)
Watson, Judith J.; Heard, Walter L., Jr.; Bush, Harold G.; Lake, M. S.; Jensen, J. K.; Wallsom, R. E.; Phelps, J. E.
1988-01-01
Underwater neutral buoyance tests were conducted to evaluate the use of a Mobile Transporter concept in conjunction with EVA astronauts to construct the Space Station Freedom truss structure. A three-bay orthogonal tetrahedral truss configuration with a 15 foot square cross section was repeatedly assembled by a single pair of pressure suited test subjects working from the Mobile Transporter astronaut positioning devices (mobile foot restraints). The average unit assembly time (which included integrated installation of utility trays) was 27.6 s/strut, or 6 min/bay. The results of these tests indicate that EVA assembly of space station size structures can be significantly enhanced when using a Mobile Transporter equipped with astronaut positioning devices. Rapid assembly time can be expected and are dependent primarily on the rate of translation permissible for on-orbit operations. The concept used to demonstate integrated installation of utility trays requires minimal EVA handling and consequentially, as the results show, has little impact on overall assembly time.
Career Profiles- Aero-Mechanical Design- Operations Engineering Branch
2015-10-26
NASA Armstrong’s Aeromechanical Design Group provides mechanical design solutions ranging from research and development to ground support equipment. With an aerospace or mechanical engineering background, team members use the latest computer-aided design software to create one-of-kind parts, assemblies, and drawings, and aid in the design’s fabrication and integration. Reverse engineering and inspection of Armstrong’s fleet of aircraft is made possible by using state-of-the-art coordinate measuring machines and laser scanning equipment.
Cyber and physical equipment digital control system in Industry 4.0 item designing company
NASA Astrophysics Data System (ADS)
Gurjanov, A. V.; Zakoldaev, D. A.; Shukalov, A. V.; Zharinov, I. O.
2018-05-01
The problem of organization of digital control of the item designing company equipped with cyber and physical systems is being studied. A scheme of cyber and physical systems and personnel interaction in the Industry 4.0 smart factory company is presented. A scheme of assembly units transportation in the Industry 4.0 smart factory company is provided. A scheme of digital control system in the Industry 4.0 smart factory company is given.
2003-11-17
KENNEDY SPACE CENTER, FLA. - The crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, away from the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.
2003-11-17
KENNEDY SPACE CENTER, FLA. - The crawler transporter has slowly moved the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, out of the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.
2003-11-17
KENNEDY SPACE CENTER, FLA. - The crawler transporter is slowly moving the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, out of the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.
2003-11-17
KENNEDY SPACE CENTER, FLA. - The crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, out of the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.
NASA Technical Reports Server (NTRS)
Smith, Andrew; LaVerde, Bruce; Fulcher, Clay; Hunt, Ron
2012-01-01
An approach for predicting the vibration, strain, and force responses of a flight-like vehicle panel assembly to acoustic pressures is presented. Important validation for the approach is provided by comparison to ground test measurements in a reverberant chamber. The test article and the corresponding analytical model were assembled in several configurations to demonstrate the suitability of the approach for response predictions when the vehicle panel is integrated with equipment. Critical choices in the analysis necessary for convergence of the predicted and measured responses are illustrated through sensitivity studies. The methodology includes representation of spatial correlation of the pressure field over the panel surface. Therefore, it is possible to demonstrate the effects of hydrodynamic coincidence in the response. The sensitivity to pressure patch density clearly illustrates the onset of coincidence effects on the panel response predictions.
Method and apparatus for extracting tritium and preparing radioactive waste for disposal
Heung, L.K.
1994-03-29
Apparatus is described for heating an object such as a nuclear target bundle to release and recover hydrogen and contain the disposable residue for disposal. The apparatus comprises an inverted furnace, a sleeve/crucible assembly for holding and enclosing the bundle, conveying equipment for placing the sleeve onto the crucible and loading the bundle into the sleeve/crucible, a lift for raising the enclosed bundle into the furnace, and hydrogen recovery equipment including a trap and strippers, all housed in a containment having negative internal pressure. The crucible/sleeve assembly has an internal volume that is sufficient to enclose and hold the bundle before heating; the crucible's internal volume is sufficient by itself to hold and enclose the bundle's volume after heating. The crucible can then be covered and disposed of; the sleeve, on the other hand, can be reused. 4 figures.
Aspects of manual wheelchair configuration affecting mobility: a review.
Medola, Fausto Orsi; Elui, Valeria Meirelles Carril; Santana, Carla da Silva; Fortulan, Carlos Alberto
2014-02-01
Many aspects relating to equipment configuration affect users' actions in a manual wheelchair, determining the overall mobility performance. Since the equipment components and configuration determine both stability and mobility efficiency, configuring the wheelchair with the most appropriate set-up for individual users' needs is a difficult task. Several studies have shown the importance of seat/backrest assembly and the relative position of the rear wheels to the user in terms of the kinetics and kinematics of manual propulsion. More recently, new studies have brought to light evidence on the inertial properties of different wheelchair configurations. Further new studies have highlighted the handrim as a key component of wheelchair assembly, since it is the interface through which the user drives the chair. In light of the new evidence on wheelchair mechanics and propulsion kinetics and kinematics, this article presents a review of the most important aspects of wheelchair configuration that affect the users' actions and mobility.
Electronics manufacturing and assembly in Japan
NASA Technical Reports Server (NTRS)
Kukowski, John A.; Boulton, William R.
1995-01-01
In the consumer electronics industry, precision processing technology is the basis for enhancing product functions and for minimizing components and end products. Throughout Japan, manufacturing technology is seen as critical to the production and assembly of advanced products. While its population has increased less than 30 percent over twenty-five years, Japan's gross national product has increase thirtyfold; this growth has resulted in large part from rapid replacement of manual operations with innovative, high-speed, large-scale, continuously running, complex machines that process a growing number of miniaturized components. The JTEC panel found that introduction of next-generation electronics products in Japan goes hand-in-hand with introduction of new and improved production equipment. In the panel's judgment, Japan's advanced process technologies and equipment development and its highly automated factories are crucial elements of its domination of the consumer electronics marketplace - and Japan's expertise in manufacturing consumer electronics products gives it potentially unapproachable process expertise in all electronics markets.
Aspects of Manual Wheelchair Configuration Affecting Mobility: A Review
Medola, Fausto Orsi; Elui, Valeria Meirelles Carril; Santana, Carla da Silva; Fortulan, Carlos Alberto
2014-01-01
Many aspects relating to equipment configuration affect users’ actions in a manual wheelchair, determining the overall mobility performance. Since the equipment components and configuration determine both stability and mobility efficiency, configuring the wheelchair with the most appropriate set-up for individual users’ needs is a difficult task. Several studies have shown the importance of seat/backrest assembly and the relative position of the rear wheels to the user in terms of the kinetics and kinematics of manual propulsion. More recently, new studies have brought to light evidence on the inertial properties of different wheelchair configurations. Further new studies have highlighted the handrim as a key component of wheelchair assembly, since it is the interface through which the user drives the chair. In light of the new evidence on wheelchair mechanics and propulsion kinetics and kinematics, this article presents a review of the most important aspects of wheelchair configuration that affect the users’ actions and mobility. PMID:24648656
Robot Would Reconfigure Modular Equipment
NASA Technical Reports Server (NTRS)
Purves, Lloyd R.
1993-01-01
Special-purpose sets of equipment, packaged in identical modules with identical interconnecting mechanisms, attached to or detached from each other by specially designed robot, according to proposal. Two-arm walking robot connects and disconnects modules, operating either autonomously or under remote supervision. Robot walks along row of connected modules by grasping successive attachment subassemblies in hand-over-hand motion. Intended application for facility or station in outer space; robot reconfiguration scheme makes it unnecessary for astronauts to venture outside spacecraft or space station. Concept proves useful on Earth in assembly, disassembly, or reconfiguration of equipment in such hostile environments as underwater, near active volcanoes, or in industrial process streams.
THE HOT CRITICAL ASSEMBLY $sub 4$CESAR$sub 4$ (in French)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tanguy, P.
1963-07-01
With Cesar, the Cadarache Center for Nuclear Studies will be equipped with a zero-power critical assembly, which will enable it to obtain the data necessary for the development of natural uranium, graphite, gas reactors. Reactivity balance, evolution of the reactivity, and deformation of the flux curves are to be studied. These studies will complement those already being done on Marius, but carried out at room temperature; in Cesar the graphite temperature can reach 500 deg C. (auth)
NASA Technical Reports Server (NTRS)
Virakas, G. I.; Matsyulevichyus, R. A.; Minkevichyus, K. P.; Potsyus, Z. Y.; Shirvinskas, B. D.
1973-01-01
Problems in measurement of irregularities in angular velocity of rotating assemblies in memory devices with rigid and flexible magnetic data carriers are discussed. A device and method for determination of change in angular velocities in various frequency and rotation rate ranges are examined. A schematic diagram of a photoelectric sensor for recording the signal pulses is provided. Mathematical models are developed to show the amount of error which can result from misalignment of the test equipment.
Operational manual for MX-290 data-voice PN Mod, MX-291 data-voice PN DEMOD
NASA Technical Reports Server (NTRS)
1971-01-01
This operation manual is also the final report of the program to design, assemble, checkout, and deliver to the customer three MX-290 transmitters and two MX-291 companion receivers. These equipments are designed and assembled to provide for maximum flexibility with respect to making changes in electrical circuits which may be required for future applications. A number of test points for monitoring and troubleshooting are provided along with easy access to subunits.
STS-88 crew members and technicians participate in their CEIT in the SSPF
NASA Technical Reports Server (NTRS)
1997-01-01
Mission Specialist Jerry Ross participates in the Crew Equipment Interface Test (CEIT) for STS-88 in KSC's Space Station Processing Facility. The CEIT gives astronauts an opportunity to get a hands-on look at the payloads with which they will be working on-orbit. Here, Ross is inspecting electrical connections that will be used in assembly of the International Space Station (ISS). STS-88, the first ISS assembly flight, is targeted for launch in July 1998 aboard Space Shuttle Endeavour.
Self-optimizing approach for automated laser resonator alignment
NASA Astrophysics Data System (ADS)
Brecher, C.; Schmitt, R.; Loosen, P.; Guerrero, V.; Pyschny, N.; Pavim, A.; Gatej, A.
2012-02-01
Nowadays, the assembly of laser systems is dominated by manual operations, involving elaborate alignment by means of adjustable mountings. From a competition perspective, the most challenging problem in laser source manufacturing is price pressure, a result of cost competition exerted mainly from Asia. From an economical point of view, an automated assembly of laser systems defines a better approach to produce more reliable units at lower cost. However, the step from today's manual solutions towards an automated assembly requires parallel developments regarding product design, automation equipment and assembly processes. This paper introduces briefly the idea of self-optimizing technical systems as a new approach towards highly flexible automation. Technically, the work focuses on the precision assembly of laser resonators, which is one of the final and most crucial assembly steps in terms of beam quality and laser power. The paper presents a new design approach for miniaturized laser systems and new automation concepts for a robot-based precision assembly, as well as passive and active alignment methods, which are based on a self-optimizing approach. Very promising results have already been achieved, considerably reducing the duration and complexity of the laser resonator assembly. These results as well as future development perspectives are discussed.
NASA Technical Reports Server (NTRS)
1974-01-01
The proposed spacecraft consists of a bus module, containing all subsystems required for support of the sensors, and a payload module containing all of the sensor equipment. The two modules are bolted together to form the spacecraft, and electrical interfaces are accomplished via mated connectors at the interface plane. This approach permits independent parallel assembly and test operations on each module up until mating for final spacecraft integration and test operations. Proposed program schedules recognize the need to refine sensor/spacecraft interfaces prior to proceeding with procurement, reflect the lead times estimated by suppliers for delivery of equipment, reflect a comprehensive test program, and provide flexibility for unanticipated problems. The spacecraft systems are described in detail along with aerospace ground equipment, ground handling equipment, the launch vehicle, imaging radar incorporation, and systems tests.
76 FR 14654 - Gulfstream Natural Gas System, L.L.C. Notice of Request Under Blanket Authorization
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-17
... design and construct, one 30-inch tie-in assembly connecting the outlet of the Gulf LNG Pipeline facilities to Gulfstream's 36-inch diameter Line No. 060, electronic gas measurement equipment, and...
40 CFR 1051.350 - What records must I keep?
Code of Federal Regulations, 2010 CFR
2010-07-01
... additional records: (1) A description of all test equipment for each test cell that you can use to test..., displacement, fuel type, or assembly plant (if you produce vehicles or engines at more than one plant). (f...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-19
... design change for the combustion chamber liner assembly. This new AD retains the requirements of the... compliance with paragraph (g) of this AD, on both engines replace the turbofan engine combustion chamber...
GPHS-RTG's in support of the Cassini mission
NASA Astrophysics Data System (ADS)
1993-10-01
The following tasks were reported: Spacecraft integration and liaison; engineering support; safety; qualified unicouple fabrication; ETG fabrication/assembly/test; ground support equipment; RTG shipping and launch support; designs/reviews/mission applications; and project management/quality assurance/contract changes.
Mars Science Laboratory Rover Taking Shape
2008-11-19
This image taken in August 2008 in a clean room at NASA JPL, Pasadena, Calif., shows NASA next Mars rover, the Mars Science Laboratory, in the course of its assembly, before additions of its arm, mast, laboratory instruments and other equipment.
Photography by KSC Space Shuttle Orbiter Enterprise mated to an external fuel tank and two solid
NASA Technical Reports Server (NTRS)
1980-01-01
Photography by KSC Space Shuttle Orbiter Enterprise mated to an external fuel tank and two solid rocket boosters on top of a Mobil Launcher Platform, undergoes fit and function checks at the launch site for the first Space Shuttle at Launch Complex 39's Pad A. The dummy Space Shuttle was assembled in the Vehicle Assembly Building and rolled out to the launch site on May 1 as part of an exercise to make certain shuttle elements are compatible with the Spaceport's assembly and launch facilities and ground support equipment, and help clear the way for the launch of the Space Shuttle Orbiter Columbia.
PHOTOGRAPHY BY KSC SPACE SHUTTLE ORBITER ENTERPRISE MATED TO AN EXTERNAL FUEL TANK AND TWO SOLID
NASA Technical Reports Server (NTRS)
1980-01-01
PHOTOGRAPHY BY KSC SPACE SHUTTLE ORBITER ENTERPRISE MATED TO AN EXTERNAL FUEL TANK AND TWO SOLID ROCKET BOOSTERS ON TOP OF A MOBIL LAUNCHER PLATFORM, UNDERGOES FIT AND FUNCTION CHECKS AT THE LAUNCH SITE FOR THE FIRST SPACE SHUTTLE AT LAUNCH COMPLEX 39'S PAD A. THE DUMMY SPACE SHUTTLE WAS ASSEMBLED IN THE VEHICLE ASSEMBLY BUILDING AND ROLLED OUT TO THE LAUNCH SITE ON MAY 1 AS PART OF AN EXERCISE TO MAKE CERTAIN SHUTTLE ELEMENTS ARE COMPATIBLE WITH THE SPACEPORT'S ASSEMBLY AND LAUNCH FACILITIES AND GROUND SUPPORT EQUIPMENT, AND HELP CLEAR THE WAY FOR THE LAUNCH OF THE SPACE SHUTTLE ORBITER COLUMBIA.
Assembling, maintaining and servicing Space Station
NASA Technical Reports Server (NTRS)
Doetsch, K. H.; Werstiuk, H.; Creasy, W.; Browning, R.
1987-01-01
The assembly, maintenance, and servicing of the Space Station and its facilities are discussed. The tools and facilities required for the assembly, maintenance, and servicing of the Station are described; the ground and transportation infrastructures needed for the Space Station are examined. The roles of automation and robotics in reducing the EVAs of the crew, minimizing disturbances to the Space Station environment, and enhancing user friendliness are investigated. Servicing/maintenance tasks are categorized based on: (1) urgency, (2) location of servicing/maintenance, (3) environmental control, (4) dexterity, (5) transportation, (6) crew interactions, (7) equipment interactions, and (8) Space Station servicing architecture. An example of a servicing mission by the Space Station for the Hubble Space Telescope is presented.
NASA Astrophysics Data System (ADS)
Zakoldaev, D. A.; Shukalov, A. V.; Zharinov, I. O.; Zharinov, O. O.
2018-05-01
The task of the algorithm of choosing the type of mechanical assembly production of instrument making enterprises of Industry 4.0 is being studied. There is a comparison of two project algorithms for Industry 3.0 and Industry 4.0. The algorithm of choosing the type of mechanical assembly production of instrument making enterprises of Industry 4.0 is based on the technological route analysis of the manufacturing process in a company equipped with cyber and physical systems. This algorithm may give some project solutions selected from the primary part or the auxiliary one of the production. The algorithm decisive rules are based on the optimal criterion.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. At the SRB Assembly and Refurbishment Facility, STS-114 Commander Eileen Collins (center) is flanked by Bob Herman (left), SRB deputy associate program manager with United Space Alliance, and Jim Carleton (right), director, SRB Program Management, as they walk past solid rocket booster aft skirts. The crew is at KSC for familiarization with Shuttle and mission equipment. The STS-114 mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment, plus the external stowage platform, to the International Space Station.
Automated robotic equipment for ultrasonic inspection of pressurizer heater wells
Nachbar, Henry D.; DeRossi, Raymond S.; Mullins, Lawrence E.
1993-01-01
A robotic device for remotely inspecting pressurizer heater wells is provided which has the advantages of quickly, precisely, and reliably acquiring data at reasonable cost while also reducing radiation exposure of an operator. The device comprises a prober assembly including a probe which enters a heater well, gathers data regarding the condition of the heater well and transmits a signal carrying that data; a mounting device for mounting the probe assembly at the opening of the heater well so that the probe can enter the heater well; a first motor mounted on the mounting device for providing movement of the probe assembly in an axial direction; and a second motor mounted on the mounting device for providing rotation of the probe assembly. This arrangement enables full inspection of the heater well to be carried out.
Precision lens assembly with alignment turning system
NASA Astrophysics Data System (ADS)
Ho, Cheng-Fang; Huang, Chien-Yao; Lin, Yi-Hao; Kuo, Hui-Jean; Kuo, Ching-Hsiang; Hsu, Wei-Yao; Chen, Fong-Zhi
2017-10-01
The poker chip assembly with high precision lens barrels is widely applied to ultra-high performance optical system. ITRC applies the poker chip assembly technology to the high numerical aperture objective lenses and lithography projection lenses because of its high efficiency assembly process. In order to achieve high precision lens cell for poker chip assembly, an alignment turning system (ATS) is developed. The ATS includes measurement, alignment and turning modules. The measurement module is equipped with a non-contact displacement sensor (NCDS) and an autocollimator (ACM). The NCDS and ACM are used to measure centration errors of the top and the bottom surface of a lens respectively; then the amount of adjustment of displacement and tilt with respect to the rotational axis of the turning machine for the alignment module can be determined. After measurement, alignment and turning processes on the ATS, the centration error of a lens cell with 200 mm in diameter can be controlled within 10 arcsec. Furthermore, a poker chip assembly lens cell with three sub-cells is demonstrated, each sub-cells are measured and accomplished with alignment and turning processes. The lens assembly test for five times by each three technicians; the average transmission centration error of assembly lens is 12.45 arcsec. The results show that ATS can achieve high assembly efficiency for precision optical systems.
IMPROVED ION-PRODUCING MECHANISM FOR CALUTRONS
Bell, W.A. Jr.; Prater, W.K.
1963-12-24
An ion source for electromagnetically operated equipment for the separation of isotopes, such as the Calutron, wherein a unitized construction is employed to house both the arc chamber and the oven chamber to facilitate assembly and maintenance and to improve operation. ( LAMBDA EC)
24 CFR 3280.302 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... any device or other means designed to transfer home anchoring loads to the ground. Anchoring equipment... means a specific anchoring assembly device designed to transfer home anchoring loads to the ground... DEVELOPMENT MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARDS Body and Frame Construction Requirements...
30 CFR 18.80 - Approval of machines assembled with certified or explosion-proof components.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Modifications of Approved Machines, and Permits To Use Experimental Equipment § 18.80 Approval of machines... approval. A design of the approval plate will accompany the notification of approval. (Refer to §§ 18.10...
30 CFR 18.80 - Approval of machines assembled with certified or explosion-proof components.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Modifications of Approved Machines, and Permits To Use Experimental Equipment § 18.80 Approval of machines... approval. A design of the approval plate will accompany the notification of approval. (Refer to §§ 18.10...
30 CFR 18.80 - Approval of machines assembled with certified or explosion-proof components.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Modifications of Approved Machines, and Permits To Use Experimental Equipment § 18.80 Approval of machines... approval. A design of the approval plate will accompany the notification of approval. (Refer to §§ 18.10...
30 CFR 18.80 - Approval of machines assembled with certified or explosion-proof components.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Modifications of Approved Machines, and Permits To Use Experimental Equipment § 18.80 Approval of machines... approval. A design of the approval plate will accompany the notification of approval. (Refer to §§ 18.10...
The Early Development of Programmable Machinery.
ERIC Educational Resources Information Center
Collins, Martin D.
1985-01-01
Programmable equipment innovations, precursors of today's technology, are examined, including the development of the binary code and feedback control systems, such as temperature sensing devices, interchangeable parts, punched cards carrying instructions, continuous flow oil refining process, assembly lines for mass production, and the…
2003-11-21
KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters, atop the crawler-transporter, crawls away from the Vehicle Assembly Building in support of the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.
2003-11-21
KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters, atop the crawler-transporter, inch away from the Vehicle Assembly Building (VAB) in support of the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.
2003-11-17
KENNEDY SPACE CENTER, FLA. - As the crawler transporter slowly moves the Mobile Launcher Platform (MLP) out of the Vehicle Assembly Building, the two solid rocket boosters on top are framed in the doorway. The move is in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.
2003-11-17
KENNEDY SPACE CENTER, FLA. - As the crawler transporter slowly moves the Mobile Launcher Platform (MLP) out of the Vehicle Assembly Building, the driver of the front control cab can be seen. The MLP is carrying two solid rocket boosters for engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.
1968-01-01
Only simple equipment, simple technology and low initial capital investment are needed in their manufacture. The condoms can be made by people who were previously unskilled or only semi-skilled workers. Plastic condoms differ from those made of latex rubber in that the nature of the plastic film allows unlimited shelf-life. Also, the plastic has a higher degree of lubricity than latex rubber; if there is a demand for extra lubrication in a particular market, this can be provided. Because the plastic is inert, these condoms need not be packaged in hermetically sealed containers. All these attributes make it possible to put these condoms on the distributors' shelves in developing countries competitively with rubber condoms. The shape of the plastic condom is based on that of the lamb caecum, which has long been used as luxury-type condom. The plastic condom is made from plastic film (ethylene ethyl acrilate) of 0.001 inch (0.0254 mm.) thickness. In addition, a rubber ring is provided and sealed into the base of the condom for retention during coitus. The advantage of the plastic condom design and the equipment on which it is made is that production can be carried out either in labour-intensive economy or with varying degrees of mechanization and automation. The uniform, finished condom if made using previously untrained workers. Training of workers can be done in a matter of hours on the two machines which are needed to produce and test the condoms. The plastic film is provided on a double wound roll, and condom blanks are prepared by means of a heat-sealing die on the stamping machine. The rubber rings are united to the condom blanks on an assembly machine, which consists of a mandrel and heat-sealing equipment to seal the rubber ring to the base of the condom. Built into the assembly machine is a simple air-testing apparatus that can detect the smallest pinhole flaw in a condom. The manufacturing process is completed by unravelling the condom from the assembly mandrel. The condom is then ready for packaging, either on automatic equipment or manually into small envelopes of highly polished paper. Although their present design is based on a heat-sealed blank, it may be possible shortly to manufacture plastic condoms on the same principle as rubber ones. A dipping process would be used, but with less sophisticated technology and with higher outputs per increment of capital investment. The present equipment used to make plastic condoms cost about 3,000 for one stamping machine and 22 assembly and testing machines. On a three shift per day, 300-day working year, it is possible, with experienced workers, to make 100,000 gross of plastic condoms for each manufacturing unit annually. As the technology is refined, the output should improve significantly.
NASA Technical Reports Server (NTRS)
Benardini, James N.; Koukol, Robert C.; Schubert, Wayne W.; Morales, Fabian; Klatte, Marlin F.
2012-01-01
A report describes an adaptation of a filter assembly to enable it to be used to filter out microorganisms from a propulsion system. The filter assembly has previously been used for particulates greater than 2 micrometers. Projects that utilize large volumes of nonmetallic materials of planetary protection concern pose a challenge to their bioburden budget, as a conservative specification value of 30 spores per cubic centimeter is typically used. Helium was collected utilizing an adapted filtration approach employing an existing Millipore filter assembly apparatus used by the propulsion team for particulate analysis. The filter holder on the assembly has a 47-mm diameter, and typically a 1.2-5 micrometer pore-size filter is used for particulate analysis making it compatible with commercially available sterilization filters (0.22 micrometers) that are necessary for biological sampling. This adaptation to an existing technology provides a proof-of-concept and a demonstration of successful use in a ground equipment system. This adaptation has demonstrated that the Millipore filter assembly can be utilized to filter out microorganisms from a propulsion system, whereas in previous uses the filter assembly was utilized for particulates greater than 2 micrometers.
48 CFR 217.171 - Multiyear contracts for services.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., vehicles, and other highly complex military equipment; (3) Specialized training requiring high-quality instructor skills (e.g., training for pilots and aircrew members or foreign language training); (4) Base... substantial contingent liabilities for the assembly, training, or transportation of a specialized work force...
18. INTERIOR VIEW TO THE WEST OF ROOM 141, THE ...
18. INTERIOR VIEW TO THE WEST OF ROOM 141, THE HVAC EQUIPMENT ROOM FOR COOLING AND HEATING OF THE BUILDING. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV
Code of Federal Regulations, 2011 CFR
2011-10-01
... injuries resulting from impact to glazing surfaces, to ensure a necessary degree of transparency in motor... through the shoulder reference point (as described in Figure 1 of Section 571.210 Seat belt assembly...
DEMONSTRATION BULLETIN: LOW TEMPERATURE THERMAL TREATMENT (LT3®) SYSTEM
The Roy F. Weston, Inc. (Weston) low temperature thermal treatment (LT3®) system thermally desorbs organic compounds from contaminated soil without heating the soil to combustion temperatures. The transportable system is comprised of equipment assembled on thre...
The deterministic optical alignment of the HERMES spectrograph
NASA Astrophysics Data System (ADS)
Gers, Luke; Staszak, Nicholas
2014-07-01
The High Efficiency and Resolution Multi Element Spectrograph (HERMES) is a four channel, VPH-grating spectrograph fed by two 400 fiber slit assemblies whose construction and commissioning has now been completed at the Anglo Australian Telescope (AAT). The size, weight, complexity, and scheduling constraints of the system necessitated that a fully integrated, deterministic, opto-mechanical alignment system be designed into the spectrograph before it was manufactured. This paper presents the principles about which the system was assembled and aligned, including the equipment and the metrology methods employed to complete the spectrograph integration.
Integrated automation for manufacturing of electronic assemblies
NASA Technical Reports Server (NTRS)
Sampite, T. Joseph
1991-01-01
Since 1985, the Naval Ocean Systems Center has been identifying and developing needed technology for flexible manufacturing of hybrid microelectronic assemblies. Specific projects have been accomplished through contracts with manufacturing companies, equipment suppliers, and joint efforts with other government agencies. The resulting technology has been shared through semi-annual meetings with government, industry, and academic representatives who form an ad hoc advisory panel. More than 70 major technical capabilities have been identified for which new development is needed. Several of these developments have been completed and are being shared with industry.
NASA Technical Reports Server (NTRS)
Scholz, A. L.; Hart, M. T.; Lowry, D. J.
1987-01-01
The Technology Information Sheet was assembled in database format during Phase I. This document was designed to provide a repository for information pertaining to 144 Operations and Maintenance Instructions (OMI) controlled operations in the Orbiter Processing Facility (OPF), Vehicle Assembly Building (VAB), and PAD. It provides a way to accumulate information about required crew sizes, operations task time duration (serial and/or parallel), special Ground Support Equipment (GSE). required, and identification of a potential application of existing technology or the need for the development of a new technolgoy item.
Truss Assembly and Welding by Intelligent Precision Jigging Robots
NASA Technical Reports Server (NTRS)
Komendera, Erik; Dorsey, John T.; Doggett, William R.; Correll, Nikolaus
2014-01-01
This paper describes an Intelligent Precision Jigging Robot (IPJR) prototype that enables the precise alignment and welding of titanium space telescope optical benches. The IPJR, equipped with micron accuracy sensors and actuators, worked in tandem with a lower precision remote controlled manipulator. The combined system assembled and welded a 2 m truss from stock titanium components. The calibration of the IPJR, and the difference between the predicted and the truss dimensions as-built, identified additional sources of error that should be addressed in the next generation of IPJRs in 2D and 3D.
Horizontal high speed stacking for batteries with prismatic cans
Bartos, Andrew L.; Lin, Yhu-Tin; Turner, III, Raymond D.
2016-06-14
A system and method for stacking battery cells or related assembled components. Generally planar, rectangular (prismatic-shaped) battery cells are moved from an as-received generally vertical stacking orientation to a generally horizontal stacking orientation without the need for robotic pick-and-place equipment. The system includes numerous conveyor belts that work in cooperation with one another to deliver, rotate and stack the cells or their affiliated assemblies. The belts are outfitted with components to facilitate the cell transport and rotation. The coordinated movement between the belts and the components promote the orderly transport and rotation of the cells from a substantially vertical stacking orientation into a substantially horizontal stacking orientation. The approach of the present invention helps keep the stacked assemblies stable so that subsequent assembly steps--such as compressing the cells or attaching electrical leads or thermal management components--may proceed with a reduced chance of error.
Power system interface and umbilical system study
NASA Technical Reports Server (NTRS)
1980-01-01
System requirements and basic design criteria were defined for berthing or docking a payload to the 25 kW power module which will provide electrical power and attitude control, cooling, data transfer, and communication services to free-flying and Orbiter sortie payloads. The selected umbilical system concept consists of four assemblies and command and display equipment to be installed at the Orbiter payload specialist station: (1) a movable platen assembly which is attached to the power system with EVA operable devices; (2) a slave platen assembly which is attached to the payload with EVA operable devices; (3) a fixed secondary platen permanently installed in the power system; and (4) a fixed secondary platen permanently installed on the payload. Operating modes and sequences are described.
Kamino, Takeo; Yaguchi, Toshie; Shimizu, Takahiro
2017-10-01
Polymer electrolyte fuel cells hold great potential for stationary and mobile applications due to high power density and low operating temperature. However, the structural changes during electrochemical reactions are not well understood. In this article, we detail the development of the sample holder equipped with gas injectors and electric conductors and its application to a membrane electrode assembly of a polymer electrolyte fuel cell. Hydrogen and oxygen gases were simultaneously sprayed on the surfaces of the anode and cathode catalysts of the membrane electrode assembly sample, respectively, and observation of the structural changes in the catalysts were simultaneously carried out along with measurement of the generated voltages.
NASA Technical Reports Server (NTRS)
Thomes, W. Joe; Ott, Melanie N.; Chuska, Richard; Switzer, Robert; Onuma, Eleanya; Blair, Diana; Frese, Erich; Matyseck, Marc
2016-01-01
Fiber optic assemblies have been used on spaceflight missions for many years as an enabling technology for routing, transmitting, and detecting optical signals. Due to the overwhelming success of NASA in implementing fiber optic assemblies on spaceflight science-based instruments, system scientists increasingly request fibers that perform in extreme environments while still maintaining very high optical transmission, stability, and reliability. Many new applications require fiber optic assemblies that will operate down to cryogenic temperatures as low as 20 Kelvin. In order for the fiber assemblies to operate with little loss in optical throughput at these extreme temperatures requires a system level approach all the way from how the fiber assembly is manufactured to how it is held, routed, and integrated. The NASA Goddard Code 562 Photonics Group has been designing, manufacturing, testing, and integrating fiber optics for spaceflight and other high reliability applications for nearly 20 years. Design techniques and lessons learned over the years are consistently applied to developing new fiber optic assemblies that meet these demanding environments. System level trades, fiber assembly design methods, manufacturing, testing, and integration will be discussed. Specific recent examples of ground support equipment for the James Webb Space Telescope (JWST); the Ice, Cloud and Land Elevation Satellite-2 (ICESat-2); and others will be included.
NASA Astrophysics Data System (ADS)
Thomes, W. Joe; Ott, Melanie N.; Chuska, Richard; Switzer, Robert; Onuma, Eleanya; Blair, Diana; Frese, Erich; Matyseck, Marc
2016-09-01
Fiber optic assemblies have been used on spaceflight missions for many years as an enabling technology for routing, transmitting, and detecting optical signals. Due to the overwhelming success of NASA in implementing fiber optic assemblies on spaceflight science-based instruments, system scientists increasingly request fibers that perform in extreme environments while still maintaining very high optical transmission, stability, and reliability. Many new applications require fiber optic assemblies that will operate down to cryogenic temperatures as low as 20 Kelvin. In order for the fiber assemblies to operate with little loss in optical throughput at these extreme temperatures requires a system level approach all the way from how the fiber assembly is manufactured to how it is held, routed, and integrated. The NASA Goddard Code 562 Photonics Group has been designing, manufacturing, testing, and integrating fiber optics for spaceflight and other high reliability applications for nearly 20 years. Design techniques and lessons learned over the years are consistently applied to developing new fiber optic assemblies that meet these demanding environments. System level trades, fiber assembly design methods, manufacturing, testing, and integration will be discussed. Specific recent examples of ground support equipment for the James Webb Space Telescope (JWST); the Ice, Cloud and Land Elevation Satellite-2 (ICESat- 2); and others will be included.
16 CFR 1210.16 - Production testing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... in the manufacturing process, the assembly process, the equipment used to manufacture the product, or... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Production testing. 1210.16 Section 1210.16... STANDARD FOR CIGARETTE LIGHTERS Certification Requirements § 1210.16 Production testing. (a) General...
29 CFR 776.28 - Covered preparatory activities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... claims, surveying, clearing the land, assembling materials and equipment, erecting sheds, derricks or.... 28 Devine v. Levy, 39 F. Supp. 44. 29 Straughn v. Schlumberger Well Surveying Corp., 72 F. Supp. 511... to the Act, preliminary activities, such as surveying, clearing, draining and leveling the land...
29 CFR 776.28 - Covered preparatory activities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... claims, surveying, clearing the land, assembling materials and equipment, erecting sheds, derricks or.... 28 Devine v. Levy, 39 F. Supp. 44. 29 Straughn v. Schlumberger Well Surveying Corp., 72 F. Supp. 511... to the Act, preliminary activities, such as surveying, clearing, draining and leveling the land...
29 CFR 776.28 - Covered preparatory activities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... claims, surveying, clearing the land, assembling materials and equipment, erecting sheds, derricks or.... 28 Devine v. Levy, 39 F. Supp. 44. 29 Straughn v. Schlumberger Well Surveying Corp., 72 F. Supp. 511... to the Act, preliminary activities, such as surveying, clearing, draining and leveling the land...
29 CFR 776.28 - Covered preparatory activities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... claims, surveying, clearing the land, assembling materials and equipment, erecting sheds, derricks or.... 28 Devine v. Levy, 39 F. Supp. 44. 29 Straughn v. Schlumberger Well Surveying Corp., 72 F. Supp. 511... to the Act, preliminary activities, such as surveying, clearing, draining and leveling the land...
29 CFR 776.28 - Covered preparatory activities.
Code of Federal Regulations, 2014 CFR
2014-07-01
... claims, surveying, clearing the land, assembling materials and equipment, erecting sheds, derricks or.... 28 Devine v. Levy, 39 F. Supp. 44. 29 Straughn v. Schlumberger Well Surveying Corp., 72 F. Supp. 511... to the Act, preliminary activities, such as surveying, clearing, draining and leveling the land...
29 CFR 1910.178 - Powered industrial trucks.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., design, maintenance, and use of fork trucks, tractors, platform lift trucks, motorized hand trucks, and... new powered industrial trucks acquired and used by an employer shall meet the design and construction... that the electrical fittings and equipment are so designed, constructed and assembled that the units...
29 CFR 1910.178 - Powered industrial trucks.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., design, maintenance, and use of fork trucks, tractors, platform lift trucks, motorized hand trucks, and... new powered industrial trucks acquired and used by an employer shall meet the design and construction... that the electrical fittings and equipment are so designed, constructed and assembled that the units...
29 CFR 1910.178 - Powered industrial trucks.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., design, maintenance, and use of fork trucks, tractors, platform lift trucks, motorized hand trucks, and... new powered industrial trucks acquired and used by an employer shall meet the design and construction... that the electrical fittings and equipment are so designed, constructed and assembled that the units...
29 CFR 1910.178 - Powered industrial trucks.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., design, maintenance, and use of fork trucks, tractors, platform lift trucks, motorized hand trucks, and... new powered industrial trucks acquired and used by an employer shall meet the design and construction... that the electrical fittings and equipment are so designed, constructed and assembled that the units...
29 CFR 1910.178 - Powered industrial trucks.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., design, maintenance, and use of fork trucks, tractors, platform lift trucks, motorized hand trucks, and... new powered industrial trucks acquired and used by an employer shall meet the design and construction... that the electrical fittings and equipment are so designed, constructed and assembled that the units...
Lidar In-space Technology Experiment (LITE) Electronics Overview
NASA Technical Reports Server (NTRS)
Blythe, Michael P.; Couch, Richard H.; Rowland, Carroll W.; Kitchen, Wayne L.; Regan, Curtis P.; Koch, Michael R.; Antill, Charles W.; Stevens, William T.; Rollins, Courtney H.; Kist, Edward H.
1992-01-01
The LITE electronics system consists of the following seven subsystems: Laser Transmitter Module (LTM), Boresight Assembly (BA), Aft-Optics Electronics (AOE), Digital Data Handling Unit (DDHU), Engineering Data System (EDS), Instrument Controller (IC), and the Ground Support Equipment (GSE). Each of these subsystems is discussed.
Cable clamp bolt fixture facilitates assembly in close quarters
NASA Technical Reports Server (NTRS)
Sunderland, G. H.
1967-01-01
Cable clamp bolt holding fixture facilitates forming of electrical cable runs in limited equipment space. The fixture engages the threads of the short clamp bolt through the clamp and maintains tension against clamp tendency to open while the operator installs the nut without difficulty.
49 CFR 396.3 - Inspection, repair, and maintenance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... systematically inspected, repaired, and maintained, all motor vehicles and intermodal equipment subject to its... affect safety of operation, including but not limited to, frame and frame assemblies, suspension systems... cause to be maintained, records for each motor vehicle they control for 30 consecutive days. Intermodal...
Helping Institutions Respond to Change Needs Through Training.
ERIC Educational Resources Information Center
Woods, Richard G.
This paper makes suggestions for adapting training and staff utilization to organizational restructuring, and responsiveness to social needs. The ideal training format for organizational innovation would require selecting, assembling, protecting, and encouraging people, from both within and outside the institution, who are best equipped to…
CPAS Parachute Testing, Model Development, & Verification
NASA Technical Reports Server (NTRS)
Romero, Leah M.
2013-01-01
Capsule Parachute Assembly System (CPAS) is the human rated parachute system for the Orion vehicle used during re-entry. Similar to Apollo parachute design. Human rating requires additional system redundancy. A Government Furnished Equipment (GFE) project responsible for: Design; Development testing; Performance modeling; Fabrication; Qualification; Delivery
40 CFR 92.106 - Equipment for loading the engine.
Code of Federal Regulations, 2011 CFR
2011-07-01
... loading the locomotive engine-alternator/generator assembly electrically, and for measurement of the... angle compensation; meter(s) for measurement of the current through the load bank (a calibrated electrical shunt and voltmeter is allowed for current measurement); meter(s) to measure the voltage across...
40 CFR 92.106 - Equipment for loading the engine.
Code of Federal Regulations, 2012 CFR
2012-07-01
... loading the locomotive engine-alternator/generator assembly electrically, and for measurement of the... angle compensation; meter(s) for measurement of the current through the load bank (a calibrated electrical shunt and voltmeter is allowed for current measurement); meter(s) to measure the voltage across...
40 CFR 92.106 - Equipment for loading the engine.
Code of Federal Regulations, 2014 CFR
2014-07-01
... loading the locomotive engine-alternator/generator assembly electrically, and for measurement of the... angle compensation; meter(s) for measurement of the current through the load bank (a calibrated electrical shunt and voltmeter is allowed for current measurement); meter(s) to measure the voltage across...
40 CFR 92.106 - Equipment for loading the engine.
Code of Federal Regulations, 2013 CFR
2013-07-01
... loading the locomotive engine-alternator/generator assembly electrically, and for measurement of the... angle compensation; meter(s) for measurement of the current through the load bank (a calibrated electrical shunt and voltmeter is allowed for current measurement); meter(s) to measure the voltage across...
33 CFR 183.202 - Flotation and certification requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... SECURITY (CONTINUED) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Flotation Requirements for Outboard Boats Rated for Engines of More Than 2 Horsepower General § 183.202 Flotation and certification requirements. Each boat to which this subpart applies must be manufactured, constructed, or assembled to pass...
33 CFR 183.202 - Flotation and certification requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SECURITY (CONTINUED) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Flotation Requirements for Outboard Boats Rated for Engines of More Than 2 Horsepower General § 183.202 Flotation and certification requirements. Each boat to which this subpart applies must be manufactured, constructed, or assembled to pass...
47 CFR 2.925 - Identification of equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... sections assembled in a common enclosure, on a common chassis or circuit board, and with common frequency controlling circuits. Devices to which a single FCC Identifier has been assigned shall be identified pursuant... circuit boards with independent frequency controlling circuits. The FCC Identifier assigned to any...
A mechanical adapter for installing mission equipment on large space structures
NASA Technical Reports Server (NTRS)
Lefever, A. E.; Totah, R. S.
1980-01-01
A mechanical attachment adapter was designed, constructed, and tested. The adapter was was included in a simulation program that investigated techniques for assembling erectable structures under simulated zero-g conditions by pressure-suited subjects in a simulated EVA mode. The adapter was utilized as an interface attachment between a simulated equipment module and one node point of a tetrahedral structural cell. The mating performance of the adapter, a self-energized mechanism, was easily and quickly demonstrated and required little effort on the part of the test subjects.
Load Bearing Equipment for Bone and Muscle Project
NASA Technical Reports Server (NTRS)
Terrier, Douglas; Clayton, Ronald G.; Shackelford, Linda
2015-01-01
Axial skeletal loads coupled with muscle torque forces around joints maintain bone. Astronauts working in pairs to exercise can provide high eccentric loads for each other that are most effective. A prototype of load bearing equipment that will allow astronauts to perform exercises using each other for counter force generation in a controlled fashion and provide eccentric overload is proposed. A frame and attachments that can be rapidly assembled for use and easily stored will demonstrate feasibility of a design that can be adapted for ISS testing and Orion use.
General-Purpose Electronic System Tests Aircraft
NASA Technical Reports Server (NTRS)
Glover, Richard D.
1989-01-01
Versatile digital equipment supports research, development, and maintenance. Extended aircraft interrogation and display system is general-purpose assembly of digital electronic equipment on ground for testing of digital electronic systems on advanced aircraft. Many advanced features, including multiple 16-bit microprocessors, pipeline data-flow architecture, advanced operating system, and resident software-development tools. Basic collection of software includes program for handling many types of data and for displays in various formats. User easily extends basic software library. Hardware and software interfaces to subsystems provided by user designed for flexibility in configuration to meet user's requirements.
Consolidated fuel reprocessing program
NASA Astrophysics Data System (ADS)
1985-04-01
A survey of electrochemical methods applications in fuel reprocessing was completed. A dummy fuel assembly shroud was cut using the remotely operated laser disassembly equipment. Operations and engineering efforts have continued to correct equipment operating, software, and procedural problems experienced during the previous uranium compaigns. Fuel cycle options were examined for the liquid metal reactor fuel cycle. In high temperature gas cooled reactor spent fuel studies, preconceptual designs were completed for the concrete storage cask and open field drywell storage concept. These and other tasks operating under the consolidated fuel reprocessing program are examined.
JWST Pathfinder Telescope Risk Reduction Cryo Test Program
NASA Technical Reports Server (NTRS)
Matthews, Gary W.; Scorse, Thomas R.; Spina, John A.; Noel, Darin M.; Havey, Keith A., Jr.; Huguet, Jesse A.; Whitman, Tony L.; Wells, Conrad; Walker, Chanda B.; Lunt, Sharon;
2015-01-01
In 2014, the Optical Ground Support Equipment was integrated into the large cryo vacuum chamber at Johnson Space Center (JSC) and an initial Chamber Commissioning Test was completed. This insured that the support equipment was ready for the three Pathfinder telescope cryo tests. The Pathfinder telescope which consists of two primary mirror segment assemblies and the secondary mirror was delivered to JSC in February 2015 in support of this critical risk reduction test program prior to the flight hardware. This paper will detail the Chamber Commissioning and first optical test of the JWST Pathfinder telescope.
Photosynthetic and respiratory activity in germfree higher plant species
NASA Technical Reports Server (NTRS)
1976-01-01
Equipment developed for the study of gas exchange in germfree plants is described. The equipment includes a gas exchange chamber to house the plant under study, a gas feed assembly to introduce and remove gas from the chamber, and a clinostat to rotate the apparatus. Fluorescent and incandescent lights are used to illuminate the chamber and a sealed plastic barrier is used to isolate the potting soil from the chamber atmosphere. The gas outflow from the chamber can be diverted to an infrared CO2 analyzer. The performance of the system was evaluated.
GSDO Program Hexavalent Chrome Alternatives: Final Pretreatments Test Report
NASA Technical Reports Server (NTRS)
Kessel, Kurt
2013-01-01
Hexavalent chrome free pretreatments should be considered for use on Ground Support Equipment (OSE) and Electrical Ground Support Equipment (EOSE). Both of the hexavalent chrome free pretreatments (Metalast TCP HF and SurTec 650C) evaluated by this project met, and in some instances exceeded, the requirements ofMIL-DTL-5541 "Chemical Conversion Coatings on Aluminum and Aluminum Alloys". For DC resistance measurements, both Metalast TCP HF and SurTec (!50C met initial requirements following assembly and in many cases continued to maintain passing readings for the duration of testing.
Infrastructure for deployment of power systems
NASA Technical Reports Server (NTRS)
Sprouse, Kenneth M.
1991-01-01
A preliminary effort in characterizing the types of stationary lunar power systems which may be considered for emplacement on the lunar surface from the proposed initial 100-kW unit in 2003 to later units ranging in power from 25 to 825 kW is presented. Associated with these power systems are their related infrastructure hardware including: (1) electrical cable, wiring, switchgear, and converters; (2) deployable radiator panels; (3) deployable photovoltaic (PV) panels; (4) heat transfer fluid piping and connection joints; (5) power system instrumentation and control equipment; and (6) interface hardware between lunar surface construction/maintenance equipment and power system. This report: (1) presents estimates of the mass and volumes associated with these power systems and their related infrastructure hardware; (2) provides task breakdown description for emplacing this equipment; (3) gives estimated heat, forces, torques, and alignment tolerances for equipment assembly; and (4) provides other important equipment/machinery requirements where applicable. Packaging options for this equipment will be discussed along with necessary site preparation requirements. Design and analysis issues associated with the final emplacement of this power system hardware are also described.
ATLS: Catheter and tube placement
NASA Technical Reports Server (NTRS)
Gosbee, John; Krupa, Debra T.; Pepper, L.; Orsak, Debra
1991-01-01
The specific objectives of this experiment are: to evaluate the rack mounted equipment and medical supplies necessary for medical procedures; to evaluate the attachments, mounting points, and inner drawer assemblies for the medical supplies; and to evaluate the procedures for performing medical scenarios. The resources available in the HMF miniracks to accomplish medical scenarios and/or procedures include: medical equipment mounted in the racks; a patch panel with places to attach tubing and catheters; self contained drawers full of critical care medical supplies; and an ALS 'backpack' for deploying supplies. The attachment lines, tubing and associated medical supplies will be deployed and used with the equipment and a patient mannequin. Data collection is provided by direct observations by the inflight experimenters, and analysis of still and video photography.
Orbital transfer vehicle launch operations study. Volume 2: Detailed summary
NASA Technical Reports Server (NTRS)
1986-01-01
A series of Operational Design Drivers were identified. Several of these could have significant impact(s) on program costs. These recommendations, for example, include such items as: complete factory assembly and checkout prior to shipment to the ground launch site to make significant reductions in time required at the launch site as well as overall manpower required to do this work; minimize use of nonstandard equipment when orbiter provided equipment is available; and require commonality (or interchangeability) of subsystem equipment elements that are common to the space station, Orbit Maneuvering Vehicles, and/or Orbit Transfer Vehicles. Several additional items were identified that will require a significant amount of management attention (and direction) to resolve. Key elements of the space based processing plans are discussed.
Portable air pollution control equipment for the control of toxic particulate emissions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chaurushia, A.; Odabashian, S.; Busch, E.
1997-12-31
Chromium VI (Cr VI) has been identified by the environmental regulatory agencies as a potent carcinogen among eleven heavy metals. A threshold level of 0.0001 lb/year for Cr VI emissions has been established by the California Air Resources Board for reporting under Assembly Bill 2588. A need for an innovative control technology to reduce fugitive emissions of Cr VI was identified during the Air Toxic Emissions Reduction Program at Northrop Grumman Military Aircraft Systems Division (NGMASD). NGMASD operates an aircraft assembly facility in El Segundo, CA. Nearly all of the aircraft components are coated with a protective coating (primer) priormore » to assembly. The primer has Cr VI as a component for its excellent corrosion resistance property. The complex assembly process requires fasteners which also need primer coating. Therefore, NGMASD utilizes High Volume Low Pressure (HVLP) guns for the touch-up spray coating operations. During the touch-up spray coating operations, Cr VI particles are atomized and transferred to the aircraft surface. The South Coast Air Quality Management District (SCAQMD) has determined that the HVLP gun transfers 65% of the paint particles onto the substrate and the remaining 35% are emitted as an overspray if air pollution controls are not applied. NGMASD has developed the Portable Air Pollution Control Equipment (PAPCE) to capture and control the overspray in order to reduce fugitive Cr VI emissions from the touch-up spray coating operations. A source test was performed per SCAQMD guidelines and the final report has been approved by the SCAQMD.« less
Code of Federal Regulations, 2014 CFR
2014-04-01
..., 1970. See paragraph (d)(2) of § 1.167(a)-11 for treatment of expenditures for the repair, maintenance... containers, glassware, silverware, textile mill cam assemblies, and other equipment includable in Group One...
Code of Federal Regulations, 2012 CFR
2012-04-01
..., 1970. See paragraph (d)(2) of § 1.167(a)-11 for treatment of expenditures for the repair, maintenance... containers, glassware, silverware, textile mill cam assemblies, and other equipment includable in Group One...
ERIC Educational Resources Information Center
1972
In order to provide basic technical and production information for closed-circuit television, the editors have assembled this series of papers. Deisgned as an introductory guide for those entering the field, the handbook covers the basic areas of non-broadcast television. Starting with facilities and equipment the guide outlines the planning and…
10 CFR 431.132 - Definitions concerning automatic commercial ice makers.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 3 2014-01-01 2014-01-01 false Definitions concerning automatic commercial ice makers... CERTAIN COMMERCIAL AND INDUSTRIAL EQUIPMENT Automatic Commercial Ice Makers § 431.132 Definitions concerning automatic commercial ice makers. Automatic commercial ice maker means a factory-made assembly (not...
10 CFR 431.132 - Definitions concerning automatic commercial ice makers.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 3 2012-01-01 2012-01-01 false Definitions concerning automatic commercial ice makers... CERTAIN COMMERCIAL AND INDUSTRIAL EQUIPMENT Automatic Commercial Ice Makers § 431.132 Definitions concerning automatic commercial ice makers. Automatic commercial ice maker means a factory-made assembly (not...
10 CFR 431.132 - Definitions concerning automatic commercial ice makers.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Definitions concerning automatic commercial ice makers... CERTAIN COMMERCIAL AND INDUSTRIAL EQUIPMENT Automatic Commercial Ice Makers § 431.132 Definitions concerning automatic commercial ice makers. Automatic commercial ice maker means a factory-made assembly (not...
10 CFR 431.132 - Definitions concerning automatic commercial ice makers.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Definitions concerning automatic commercial ice makers... CERTAIN COMMERCIAL AND INDUSTRIAL EQUIPMENT Automatic Commercial Ice Makers § 431.132 Definitions concerning automatic commercial ice makers. Automatic commercial ice maker means a factory-made assembly (not...
10 CFR 431.132 - Definitions concerning automatic commercial ice makers.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 3 2013-01-01 2013-01-01 false Definitions concerning automatic commercial ice makers... CERTAIN COMMERCIAL AND INDUSTRIAL EQUIPMENT Automatic Commercial Ice Makers § 431.132 Definitions concerning automatic commercial ice makers. Automatic commercial ice maker means a factory-made assembly (not...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
... volatile organic compound (VOC) emissions from automotive parts and component, automobile refinishing... metal parts and products, miscellaneous uses, automobile refinishing processes and automotive equipment... Techniques Guidelines for Automobile and Light-Duty Truck Assembly Coatings,'' EPA (EPA-453/R-08-006...
Noncontaminating technique for making holes in existing process systems
NASA Technical Reports Server (NTRS)
Hecker, T. P.; Czapor, H. P.; Giordano, S. M.
1972-01-01
Technique is developed for making cleanly-contoured holes in assembled process systems without introducing chips or other contaminants into system. Technique uses portable equipment and does not require dismantling of system. Method was tested on Inconel, stainless steel, ASTMA-53, and Hastelloy X in all positions.
NASA Technical Reports Server (NTRS)
Miller, L.
1980-01-01
A facility which produces electrodes for spacecraft power supplies is described. The electrode assembly procedures are discussed. A number of design features in the production process are reported including a batch operation mode and an independent equipment module design approach for transfering the electrode materials from process tank to process tank.
USSR Report Machine Tools and Metalworking Equipment
1986-02-13
greater part of the meat-milk and food industry, particularly, to bread-making, canning and confectionery industries. One can- not do without assembling...competitiveness in the foreign market . An analysis of the national economic development plan for 1984 and the first four years of the current five
40 CFR 204.57-3 - Test compressor preparation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROGRAMS NOISE EMISSION STANDARDS FOR CONSTRUCTION EQUIPMENT Portable Air Compressors § 204.57-3 Test... measurement methodology. (c) In the event of compressor manfunction (i.e., failure to start, misfiring... in a normal manner. (d) No quality control, testing, assembly, or selection procedures shall be used...
AE (Acoustic Emission) for Flip-Chip CGA/FCBGA Defect Detection
NASA Technical Reports Server (NTRS)
Ghaffarian, Reza
2014-01-01
C-mode scanning acoustic microscopy (C-SAM) is a nondestructive inspection technique that uses ultrasound to show the internal feature of a specimen. A very high or ultra-high-frequency ultrasound passes through a specimen to produce a visible acoustic microimage (AMI) of its inner features. As ultrasound travels into a specimen, the wave is absorbed, scattered or reflected. The response is highly sensitive to the elastic properties of the materials and is especially sensitive to air gaps. This specific characteristic makes AMI the preferred method for finding "air gaps" such as delamination, cracks, voids, and porosity. C-SAM analysis, which is a type of AMI, was widely used in the past for evaluation of plastic microelectronic circuits, especially for detecting delamination of direct die bonding. With the introduction of the flip-chip die attachment in a package; its use has been expanded to nondestructive characterization of the flip-chip solder bumps and underfill. Figure 1.1 compares visual and C-SAM inspection approaches for defect detection, especially for solder joint interconnections and hidden defects. C-SAM is specifically useful for package features like internal cracks and delamination. C-SAM not only allows for the visualization of the interior features, it has the ability to produce images on layer-by-layer basis. Visual inspection; however, is only superior to C-SAM for the exposed features including solder dewetting, microcracks, and contamination. Ideally, a combination of various inspection techniques - visual, optical and SEM microscopy, C-SAM, and X-ray - need to be performed in order to assure quality at part, package, and system levels. This reports presents evaluations performed on various advanced packages/assemblies, especially the flip-chip die version of ball grid array/column grid array (BGA/CGA) using C-SAM equipment. Both external and internal equipment was used for evaluation. The outside facility provided images of the key features that could be detected using the most advanced C-SAM equipment with a skilled operator. Investigation continued using in-house equipment with its limitations. For comparison, representative X-rays of the assemblies were also gathered to show key defect detection features of these non-destructive techniques. Key images gathered and compared are: Compared the images of 2D X-ray and C-SAM for a plastic LGA assembly showing features that could be detected by either NDE technique. For this specific case, X-ray was a clear winner. Evaluated flip-chip CGA and FCBGA assemblies with and without heat sink by C-SAM. Only the FCCGA package that had no heat sink could be fully analyzed for underfill and bump quality. Cross-sectional microscopy did not revealed peripheral delamination features detected by C-SAM. Analyzed a number of fine pitch PBGA assemblies by C-SAM. Even though the internal features of the package assemblies could be detected, C-SAM was unable to detect solder joint failure at either the package or board level. Twenty times touch ups by solder iron with 700degF tip temperature, each with about 5 second duration, did not induce defects to be detected by C-SAM images. Other techniques need to be considered to induce known defects for characterization. Given NASA's emphasis on the use of microelectronic packages and assemblies and quality assurance on workmanship defect detection, understanding key features of various inspection systems that detect defects in the early stages of package and assembly is critical to developing approaches that will minimize future failures. Additional specific, tailored non-destructive inspection approaches could enable low-risk insertion of these advanced electronic packages having hidden and fine features.
2003-11-21
KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters, atop the crawler-transporter, crawl out of the Vehicle Assembly Building (VAB) in support of the second engineering analysis vibration test on the crawler and MLP. In the background is another MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.
2003-11-17
KENNEDY SPACE CENTER, FLA. - The crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, away from the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. On either side of the boosters on the horizon can be seen the two launch pads. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.
Innovative applications of artificial intelligence
NASA Astrophysics Data System (ADS)
Schorr, Herbert; Rappaport, Alain
Papers concerning applications of artificial intelligence are presented, covering applications in aerospace technology, banking and finance, biotechnology, emergency services, law, media planning, music, the military, operations management, personnel management, retail packaging, and manufacturing assembly and design. Specific topics include Space Shuttle telemetry monitoring, an intelligent training system for Space Shuttle flight controllers, an expert system for the diagnostics of manufacturing equipment, a logistics management system, a cooling systems design assistant, and a knowledge-based integrated circuit design critic. Additional topics include a hydraulic circuit design assistant, the use of a connector assembly specification expert system to harness detailed assembly process knowledge, a mixed initiative approach to airlift planning, naval battle management decision aids, an inventory simulation tool, a peptide synthesis expert system, and a system for planning the discharging and loading of container ships.
Maximizing coupling-efficiency of high-power diode lasers utilizing hybrid assembly technology
NASA Astrophysics Data System (ADS)
Zontar, D.; Dogan, M.; Fulghum, S.; Müller, T.; Haag, S.; Brecher, C.
2015-03-01
In this paper, we present hybrid assembly technology to maximize coupling efficiency for spatially combined laser systems. High quality components, such as center-turned focusing units, as well as suitable assembly strategies are necessary to obtain highest possible output ratios. Alignment strategies are challenging tasks due to their complexity and sensitivity. Especially in low-volume production fully automated systems are economically at a disadvantage, as operator experience is often expensive. However reproducibility and quality of automatically assembled systems can be superior. Therefore automated and manual assembly techniques are combined to obtain high coupling efficiency while preserving maximum flexibility. The paper will describe necessary equipment and software to enable hybrid assembly processes. Micromanipulator technology with high step-resolution and six degrees of freedom provide a large number of possible evaluation points. Automated algorithms are necess ary to speed-up data gathering and alignment to efficiently utilize available granularity for manual assembly processes. Furthermore, an engineering environment is presented to enable rapid prototyping of automation tasks with simultaneous data ev aluation. Integration with simulation environments, e.g. Zemax, allows the verification of assembly strategies in advance. Data driven decision making ensures constant high quality, documents the assembly process and is a basis for further improvement. The hybrid assembly technology has been applied on several applications for efficiencies above 80% and will be discussed in this paper. High level coupling efficiency has been achieved with minimized assembly as a result of semi-automated alignment. This paper will focus on hybrid automation for optimizing and attaching turning mirrors and collimation lenses.
NASA Technical Reports Server (NTRS)
1979-01-01
A plan for the production of two PEP flight systems is defined. The task's milestones are described. Provisions for the development and assembly of new ground support equipment required for both testing and launch operations are included.
Unitized Nut-and-Washer Assembly
NASA Technical Reports Server (NTRS)
Rossi, P. J.
1986-01-01
Combination nut, washer, and lockwasher secures parts quickly without damaging metal finishes. Nut and lockwasher are captured by bent tabs of flat washer in this concept for unified fastener. Optional perforated tab on flat washer allows easy tagging and storage. Fastener intended for attaching leads and buses to studs on electronic equipment.
29 CFR 1915.173 - Drums and containers.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 7 2010-07-01 2010-07-01 false Drums and containers. 1915.173 Section 1915.173 Labor... Vessels, Drums and Containers, Other Than Ship's Equipment § 1915.173 Drums and containers. (a) Shipping drums and containers shall not be pressurized to remove their contents. (b) A temporarily assembled...
Programming Programmable Logic Controller. High-Technology Training Module.
ERIC Educational Resources Information Center
Lipsky, Kevin
This training module on programming programmable logic controllers (PLC) is part of the memory structure and programming unit used in a packaging systems equipment control course. In the course, students assemble, install, maintain, and repair industrial machinery used in industry. The module contains description, objectives, content outline,…
2012-12-01
mineral and organic materials situated beneath an aqueous layer. PEDs assembled, installed, and retrieved following these procedures will be suitable...at a minimum, wearing adequate protective equipment, flotation devices, and making use of lifelines. 8.0 References Massachusetts Institute of
49 CFR 572.199 - Pelvis iliac.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 7 2013-10-01 2013-10-01 false Pelvis iliac. 572.199 Section 572.199... Test Dummy, Small Adult Female § 572.199 Pelvis iliac. (a) The iliac is part of the lower torso... the assembled dummy (drawing 180-0000). The dummy is equipped with a laterally oriented pelvis...
49 CFR 572.199 - Pelvis iliac.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 7 2014-10-01 2014-10-01 false Pelvis iliac. 572.199 Section 572.199... Test Dummy, Small Adult Female § 572.199 Pelvis iliac. (a) The iliac is part of the lower torso... the assembled dummy (drawing 180-0000). The dummy is equipped with a laterally oriented pelvis...
49 CFR 572.198 - Pelvis acetabulum.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 7 2012-10-01 2012-10-01 false Pelvis acetabulum. 572.198 Section 572.198... Dummy, Small Adult Female § 572.198 Pelvis acetabulum. (a) The acetabulum is part of the lower torso... torso of the assembled dummy (drawing 180-0000). The dummy is equipped with a laterally oriented pelvis...
49 CFR 572.198 - Pelvis acetabulum.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 7 2011-10-01 2011-10-01 false Pelvis acetabulum. 572.198 Section 572.198... Dummy, Small Adult Female § 572.198 Pelvis acetabulum. (a) The acetabulum is part of the lower torso... torso of the assembled dummy (drawing 180-0000). The dummy is equipped with a laterally oriented pelvis...
40 CFR 63.3981 - What definitions apply to this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
...-road vehicle that are painted off-vehicle to protect systems, equipment, or to allow full coverage... considered adhesives under this subpart. Assembled on-road vehicle coating means any coating operation in... or trailer intended for on-road use including, but not limited to, components or surfaces on...
40 CFR 63.3981 - What definitions apply to this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
...-road vehicle that are painted off-vehicle to protect systems, equipment, or to allow full coverage... considered adhesives under this subpart. Assembled on-road vehicle coating means any coating operation in... or trailer intended for on-road use including, but not limited to, components or surfaces on...
40 CFR 63.3981 - What definitions apply to this subpart?
Code of Federal Regulations, 2012 CFR
2012-07-01
...-road vehicle that are painted off-vehicle to protect systems, equipment, or to allow full coverage... considered adhesives under this subpart. Assembled on-road vehicle coating means any coating operation in... or trailer intended for on-road use including, but not limited to, components or surfaces on...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-30
..., Texas, Notification of Proposed Production Activity, Bauer Manufacturing Inc., (Pile Drivers, Boring... produce pile drivers and leads, boring machinery, foundation construction equipment, foundation casings, related parts and sub-assemblies, and tools and accessories for pile drivers and boring machinery within...
50 CFR 622.4 - Permits and fees.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) and 28°35.1′ N. lat. (due east of the NASA Vehicle Assembly Building, Cape Canaveral, FL), a... LORAN or Global Positioning System equipment; (2) Shows the site on a chart in sufficient detail to... application form, showing that applicable eligibility requirements of paragraph (a)(2) of this section have...
21 CFR 1000.55 - Recommendation for quality assurance programs in diagnostic radiology facilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... components of an x-ray system. The quality control techniques thus are concerned directly with the equipment... in response to monitoring results. These procedures provide the organizational framework for the... control, a tube-housing assembly, a beam-limiting device, and the necessary supporting structures. Other...
29 CFR 1926.1402 - Ground conditions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Ground conditions. 1926.1402 Section 1926.1402 Labor... Ground conditions. (a) Definitions. (1) “Ground conditions” means the ability of the ground to support...) The equipment must not be assembled or used unless ground conditions are firm, drained, and graded to...
NASA Technical Reports Server (NTRS)
1972-01-01
Guidelines for the selection of equipment to be used for manned spacecraft in order to assure a five year maintenance-free service life were developed. A special study was conducted to determine the adequacy of the procedures used to determine the quality and effectiveness of various components. The subjects examined are: (1) temperature cycling for acceptance of electronic assemblies; (2) accelerated testing techniques; (3) electronic part screening techniques; (4) electronic part derating practices; (5) vibration life extension of printed circuit board assemblies; and (6) tolerance funnelling and test requirements.
Lightweight Forms for Epoxy/Aramid Ducts
NASA Technical Reports Server (NTRS)
Mix, E. W.; Anderson, A. N.; Bedford, Donald L., Sr.
1986-01-01
Aluminum mandrels easy to remove. Lightweight aluminum mandrel for shaping epoxy/aramid ducts simplifies and speeds production. In new process, glass-reinforced epoxy/aramid cloth wrapped on aluminum mandrel. Stainless-steel flanges and other hardware fitted on duct and held by simple tooling. Entire assembly placed in oven to cure epoxy. After curing, assembly placed in alkaline bath dissolves aluminum mandrel in about 4 hours. Epoxy/aramid shell ready for use as duct. Aluminum mandrel used to make ducts of various inside diameters up to 6 in. Standard aluminum forms used. Conventional tube-bending equipment produces requisite curves in mandrels.
Test rig and particulate deposit and cleaning evaluation processes using the same
Schroder, Mark Stewart; Woodmansee, Donald Ernest; Beadie, Douglas Frank
2002-01-01
A rig and test program for determining the amount, if any, of contamination that will collect in the passages of a fluid flow system, such as a power plant fluid delivery system to equipment assemblies or sub-assemblies, and for establishing methods and processes for removing contamination therefrom. In the presently proposed embodiment, the rig and test programs are adapted in particular to utilize a high-pressure, high-volume water flush to remove contamination from substantially the entire fluid delivery system, both the quantity of contamination and as disposed or deposited within the system.
STRUCTURE FOR SUB-ASSEMBLIES OF ELECTRONIC EQUIPMENT
Bell, P.R.; Harris, C.C.
1959-03-31
Sub-assemblies for electronic systems, particularly a unit which is self- contained and which may be adapted for quick application to and detachment from a chassis or panel, are discussed. The disclosed structure serves the dual purpose of a cover or enclosure for a subassembly comprising a base plate and also acts as a clamp for retaining the base plate in position on a chassis. The clamping action is provided by flexible fingers projecting from the side walls of the cover and extending through grooves in the base plate to engage with the opposite side of the chassis.
EMC tests on the RITA Ion Propulsion Assembly for the ARTEMIS satellite
NASA Astrophysics Data System (ADS)
Mueller, H.; Kukies, R.; Bassner, H.
1992-07-01
Objectives and results of EMC tests performed on the RITA Ion Propulsion Assembly to demonstrate its compatibility with the requirements of ARTEMIS are discussed. The tested configuration included the RIT 10 thruster, neutralizer, RF generator, power supply and control unit, and electrical ground support equipment. Test results show that the RIT 10 thruster fulfils the EMC requirements for radiated emission in the critical frequency ranges (L/S/KU bands). The emitted E- and H-fields are not expected to disturb the satellite electronics, and no special shielding or other measures to protect the antennas are needed.
STS-88 crew members and technicians participate in their CEIT in the SSPF
NASA Technical Reports Server (NTRS)
1997-01-01
Pilot Rick Sturckow, left of center, and Mission Specialist Jerry Ross, right of center, participate in the Crew Equipment Interface Test (CEIT) for STS-88 in KSC's Space Station Processing Facility. The CEIT gives astronauts an opportunity to get a hands-on look at the payloads with which they will be working on-orbit. Here, the crew is inspecting electrical connections that will be used in assembly of the International Space Station (ISS). STS-88, the first ISS assembly flight, is targeted for launch in July 1998 aboard Space Shuttle Endeavour.
Development and Implementation of Environmentally Compatible Solid Film Lubricants
NASA Technical Reports Server (NTRS)
Novak, Howard L.; Hall, Phillip B.
1999-01-01
Multi-body launch vehicles require the use of Solid Film Lubricants (SFLs) to allow for unrestricted relative motion between structural assemblies and components during lift-off and ascent into orbit. The Space Shuttle Solid Rocket Booster (SRB), uses a dual coat, ceramic-bonded high temperature SFL in several locations such as restraint hardware between the SRB aft skirt and the Mobile Launch Platform (MLP), the aft SRB/External Tank (ET) attach struts, and the forward skirt SRB/ET attach ball assembly. Future launch systems may require similar applications of SFLs for attachment and restraint hardware. A family of environmentally compatible non-lead/antimony bearing alternative SFLs have been developed including a compatible repair material. In addition, commercial applications for SFLs on transportation equipment, all types of lubricated fasteners, and energy related equipment allow for wide usage's of these new lubricants. The new SFLs trade named BOOSTERLUBE is a family of single layer thin film (0.001 inch maximum) coatings that are a unique mixture of non-hazardous pigments in a compatible resin system that allows for low temperature curing (450 F). Significant savings in energy and processing time as well as elimination of hazardous material usage and disposal would result from the non-toxic one-step SFL application. Compatible air-dry field repair lubricants will help eliminate disassembly of launch vehicle restraint hardware during critical time sensitive assembly operations.
2004-03-05
KENNEDY SPACE CENTER, FLA. - At the SRB Assembly and Refurbishment Facility, STS-114 Mission Specialists Andrew Thomas (center) and Charles Camarda (right) look at a test panel of insulation material (left) cut in a liquid nitrogen process and a round aft heat seal (right) also treated in a liquid nitrogen process. At left is Mike Leppert, Manufacturing Operations project lead with United Space Alliance. The crew is at KSC for familiarization with Shuttle and mission equipment. The STS-114 mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment, plus the external stowage platform, to the International Space Station.
Oblique view of the Orbiter Discovery from an elevated platform ...
Oblique view of the Orbiter Discovery from an elevated platform in the Vehicle Assembly Building at NASA's Kennedy Space Center. Note the Forward Reaction Control System (RCS) Module from the forward section and the Orbiter Maneuvering System (OMS)/RCS pods from the aft section have been removed. Ground support equipment called Strongbacks are attached to the payload bay doors and the Flight Deck windows have been covered by ground support equipment. Also note the scale figure standing by the Orbiter. - Space Transportation System, Orbiter Discovery (OV-103), Lyndon B. Johnson Space Center, 2101 NASA Parkway, Houston, Harris County, TX
Facility Systems, Ground Support Systems, and Ground Support Equipment General Design Requirements
NASA Technical Reports Server (NTRS)
Thaxton, Eric A.
2014-01-01
KSC-DE-512-SM establishes overall requirements and best design practices to be used at the John F. Kennedy Space Center (KSC) for the development of ground systems (GS) in support of operations at launch, landing, and retrieval sites. These requirements apply to the design and development of hardware and software for ground support equipment (GSE), ground support systems (GSS), and facility ground support systems (F-GSS) used to support the KSC mission for transportation, receiving, handling, assembly, test, checkout, servicing, and launch of space vehicles and payloads and selected flight hardware items for retrieval. This standards manual supplements NASA-STD-5005 by including KSC-site-specific and local environment requirements. These requirements and practices are optional for equipment used at manufacturing, development, and test sites.
NASA Technical Reports Server (NTRS)
Eastman, G. Yale; Dussinger, Peter M.; Hartenstine, John R.
1994-01-01
Three modular heat-transfer components designed for use together or separately. Simple mechanical connections facilitate assembly of these and related heat-transfer components into cooling systems of various configurations, such as to cool laboratory equipment rearranged for different experiments. Components are clamp-on cold plate, cold plate attached to flexible heat pipe, and thermal-bus receptacle. Clamp-on cold plate moved to any convenient location for attachment of equipment cooled by it, then clamped onto thermal bus. Heat from equipment conducted through plate and into coolant. Thermal-bus receptacle integral with thermal bus. Includes part of thermal bus to which clamp-on cold plate attached, plus tapered socket into which condenser end of flexible heat pipe plugged. Thermal-bus receptacle includes heat-pipe wick structure using coolant in bus to enhance transfer of heat from cold plate.
STS-112 crew during Crew Equipment Interface Test
NASA Technical Reports Server (NTRS)
2002-01-01
KENNEDY SPACE CENTER, FLA. -- Accompanied by a technician, STS-112 Pilot Pamela Melroy (left) and Mission Specialist David Wolf (right) look at the payload and equipment in the bay of Atlantis during a Crew Equipment Interface Test at KSC. STS-112 is the 15th assembly flight to the International Space Station and will be ferrying the S1 Integrated Truss Structure. The S1 truss is the first starboard (right-side) truss segment, whose main job is providing structural support for the radiator panels that cool the Space Station's complex power system. The S1 truss segment also will house communications systems, external experiment positions and other subsystems. The S1 truss will be attached to the S0 truss. STS-112 is currently scheduled for launch Aug. 22, 2002 .
DOE Office of Scientific and Technical Information (OSTI.GOV)
Witt, Adam M.; Hadjerioua, Boualem; Martinez, Rocio
The viability of modular pumped storage hydro (m-PSH) is examined in detail through the conceptual design, cost scoping, and economic analysis of three case studies. Modular PSH refers to both the compactness of the project design and the proposed nature of product fabrication and performance. A modular project is assumed to consist of pre-fabricated standardized components and equipment, tested and assembled into modules before arrival on site. This technology strategy could enable m-PSH projects to deploy with less substantial civil construction and equipment component costs. The concept of m-PSH is technically feasible using currently available conventional pumping and turbine equipment,more » and may offer a path to reducing the project development cycle from inception to commissioning.« less
STS-112 crew during Crew Equipment Interface Test
NASA Technical Reports Server (NTRS)
2002-01-01
KENNEDY SPACE CENTER, FLA. - During a Crew Equipment Interface Test, STS-112 Pilot Pamela Melroy (left) and Mission Specialist David Wolf (right) look at equipment pointed out by a technician in the payload bay of Atlantis. STS-112 is the 15th assembly flight to the International Space Station and will be ferrying the S1 Integrated Truss Structure. The S1 truss is the first starboard (right-side) truss segment, whose main job is providing structural support for the radiator panels that cool the Space Station's complex power system. The S1 truss segment also will house communications systems, external experiment positions and other subsystems. The S1 truss will be attached to the S0 truss. STS-112 is currently scheduled for launch Aug. 22, 2002 .
Method of Optimizing the Construction of Machining, Assembly and Control Devices
NASA Astrophysics Data System (ADS)
Iordache, D. M.; Costea, A.; Niţu, E. L.; Rizea, A. D.; Babă, A.
2017-10-01
Industry dynamics, driven by economic and social requirements, must generate more interest in technological optimization, capable of ensuring a steady development of advanced technical means to equip machining processes. For these reasons, the development of tools, devices, work equipment and control, as well as the modernization of machine tools, is the certain solution to modernize production systems that require considerable time and effort. This type of approach is also related to our theoretical, experimental and industrial applications of recent years, presented in this paper, which have as main objectives the elaboration and use of mathematical models, new calculation methods, optimization algorithms, new processing and control methods, as well as some structures for the construction and configuration of technological equipment with a high level of performance and substantially reduced costs..
Hazard Analysis for the Mark III Space Suit Assembly (SSA) Used in One-g Operations
NASA Technical Reports Server (NTRS)
Mitchell, Kate; Ross, Amy; Blanco, Raul; Wood, Art
2012-01-01
This Hazard Analysis document encompasses the Mark III Space Suit Assembly (SSA) and associated ancillary equipment. It has been prepared using JSC17773, "Preparing Hazard Analyses for JSC Ground Operation", as a guide. The purpose of this document is to present the potential hazards involved in ground (23 % maximum O2, One-g) operations of the Mark III and associated ancillary support equipment system. The hazards listed in this document are specific to suit operations only; each supporting facility (Bldg. 9, etc.) is responsible for test specific Hazard Analyses. A "hazard" is defined as any condition that has the potential for harming personnel or equipment. This analysis was performed to document the safety aspects associated with manned use of the Mark III for pressurized and unpressurized ambient, ground-based, One-g human testing. The hazards identified herein represent generic hazards inherent to all standard JSC test venues for nominal ground test configurations. Non-standard test venues or test specific configurations may warrant consideration of additional hazards analysis prior to test. The cognizant suit engineer is responsible for the safety of the astronaut/test subject, space suit, and suit support personnel. The test requester, for the test supported by the suit test engineer and suited subject, is responsible for overall safety and any necessary Test Readiness Reviews (TRR).
Hazard Analysis for Building 34 Vacuum Glove Box Assembly
NASA Technical Reports Server (NTRS)
Meginnis, Ian
2014-01-01
One of the characteristics of an effective safety program is the recognition and control of hazards before mishaps or failures occur. Conducting potentially hazardous tests necessitates a thorough hazard analysis in order to prevent injury to personnel, and to prevent damage to facilities and equipment. The primary purpose of this hazard analysis is to define and address the potential hazards and controls associated with the Building 34 Vacuum Glove Box Assembly, and to provide the applicable team of personnel with the documented results. It is imperative that each member of the team be familiar with the hazards and controls associated with his/her particular tasks, assignments and activities while interfacing with facility test systems, equipment and hardware. In fulfillment of the stated purposes, the goal of this hazard analysis is to identify all hazards that have the potential to harm personnel, damage the facility or its test systems or equipment, test articles, Government or personal property, or the environment. This analysis may also assess the significance and risk, when applicable, of lost test objectives when substantial monetary value is involved. The hazards, causes, controls, verifications, and risk assessment codes have been documented on the hazard analysis work sheets in Appendix A of this document. The preparation and development of this report is in accordance with JPR 1700.1, "JSC Safety and Health Handbook" and JSC 17773 Rev D "Instructions for Preparation of Hazard Analysis for JSC Ground Operations".
A Demonstrator Intelligent Scheduler For Sensor-Based Robots
NASA Astrophysics Data System (ADS)
Perrotta, Gabriella; Allen, Charles R.; Shepherd, Andrew J.
1987-10-01
The development of an execution module capable of functioning as as on-line supervisor for a robot equipped with a vision sensor and tactile sensing gripper system is described. The on-line module is supported by two off-line software modules which provide a procedural based assembly constraints language to allow the assembly task to be defined. This input is then converted into a normalised and minimised form. The host Robot programming language permits high level motions to be issued at the to level, hence allowing a low programming overhead to the designer, who must describe the assembly sequence. Components are selected for pick and place robot movement, based on information derived from two cameras, one static and the other mounted on the end effector of the robot. The approach taken is multi-path scheduling as described by Fox pi. The system is seen to permit robot assembly in a less constrained parts presentation environment making full use of the sensory detail available on the robot.
High-power fused assemblies enabled by advances in fiber-processing technologies
NASA Astrophysics Data System (ADS)
Wiley, Robert; Clark, Brett
2011-02-01
The power handling capabilities of fiber lasers are limited by the technologies available to fabricate and assemble the key optical system components. Previous tools for the assembly, tapering, and fusion of fiber laser elements have had drawbacks with regard to temperature range, alignment capability, assembly flexibility and surface contamination. To provide expanded capabilities for fiber laser assembly, a wide-area electrical plasma heat source was used in conjunction with an optimized image analysis method and a flexible alignment system, integrated according to mechatronic principles. High-resolution imaging and vision-based measurement provided feedback to adjust assembly, fusion, and tapering process parameters. The system was used to perform assembly steps including dissimilar-fiber splicing, tapering, bundling, capillary bundling, and fusion of fibers to bulk optic devices up to several mm in diameter. A wide range of fiber types and diameters were tested, including extremely large diameters and photonic crystal fibers. The assemblies were evaluated for conformation to optical and mechanical design criteria, such as taper geometry and splice loss. The completed assemblies met the performance targets and exhibited reduced surface contamination compared to assemblies prepared on previously existing equipment. The imaging system and image analysis algorithms provided in situ fiber geometry measurement data that agreed well with external measurement. The ability to adjust operating parameters dynamically based on imaging was shown to provide substantial performance benefits, particularly in the tapering of fibers and bundles. The integrated design approach was shown to provide sufficient flexibility to perform all required operations with a minimum of reconfiguration.
Industrializing Offshore Wind Power with Serial Assembly and Lower-cost Deployment - Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kempton, Willett
A team of engineers and contractors has developed a method to move offshore wind installation toward lower cost, faster deployment, and lower environmental impact. A combination of methods, some incremental and some breaks from past practice, interact to yield multiple improvements. Three designs were evaluated based on detailed engineering: 1) a 5 MW turbine on a jacket with pin piles (base case), 2) a 10 MW turbine on a conventional jacket with pin piles, assembled at sea, and 3) a 10 MW turbine on tripod jacket with suction buckets (caissons) and with complete turbine assembly on-shore. The larger turbine, assemblymore » ashore, and the use of suction buckets together substantially reduce capital cost of offshore wind projects. Notable capital cost reductions are: changing from 5 MW to 10 MW turbine, a 31% capital cost reduction, and assembly on land then single-piece install at sea an additional 9% capital cost reduction. An estimated Design 4) estimates further cost reduction when equipment and processes of Design 3) are optimized, rather than adapted to existing equipment and process. Cost of energy for each of the four Designs are also calculated, yielding approximately the same percentage reductions. The methods of Design 3) analyzed here include accepted structures such as suction buckets used in new ways, innovations conceived but previously without engineering and economic validation, combined with new methods not previously proposed. Analysis of Designs 2) and 3) are based on extensive engineering calculations and detailed cost estimates. All design methods can be done with existing equipment, including lift equipment, ports and ships (except that design 4 assumes a more optimized ship). The design team consists of experienced offshore structure designers, heavy lift engineers, wind turbine designers, vessel operators, and marine construction contractors. Comparing the methods based on criteria of cost and deployment speed, the study selected the third design. That design is, in brief: a conventional turbine and tubular tower is mounted on a tripod jacket, in turn atop three suction buckets. Blades are mounted on the tower, not on the hub. The entire structure is built in port, from the bottom up, then assembled structures are queued in the port for deployment. During weather windows, the fully-assembled structures are lifted off the quay, lashed to the vessel, and transported to the deployment site. The vessel analyzed is a shear leg crane vessel with dynamic positioning like the existing Gulliver, or it could be a US-built crane barge. On site, the entire structure is lowered to the bottom by the crane vessel, then pumping of the suction buckets is managed by smaller service vessels. Blades are lifted into place by small winches operated by workers in the nacelle without lift vessel support. Advantages of the selected design include: cost and time at sea of the expensive lift vessel are significantly reduced; no jack up vessel is required; the weather window required for each installation is shorter; turbine structure construction is continuous with a queue feeding the weather-dependent installation process; pre-installation geotechnical work is faster and less expensive; there are no sound impacts on marine mammals, thus minimal spotting and no work stoppage Industrializing Offshore Wind Power 6 of 96 9 for mammal passage; the entire structure can be removed for decommissioning or major repairs; the method has been validated for current turbines up to 10 MW, and a calculation using simple scaling shows it usable up to 20 MW turbines.« less
Performance of The Far Ultraviolet Spectroscopic Explorer Mirror Assemblies
NASA Technical Reports Server (NTRS)
Ohi, Raymond G.; Barkhouser, Robert H.; Conard, Steven J.; Friedman, Scott D.; Hampton, Jeffery; Moos, H. Warren; Nikulla, Paul; Oliveira, Cristina M.; Saha, Timo T.; Obenschain, Arthur (Technical Monitor)
2000-01-01
The Far Ultraviolet Spectroscopic Explorer is a NASA astrophysics satellite which produces high-resolution spectra in the far-ultraviolet (90.5-118.7 nm bandpass) using a high effective area and low background detectors. The observatory was launched on its three-year mission from Cape Canaveral Air Station on 24 June 1999. The instrument contains four coaligned, normal incidence, off-axis parabolic mirrors which illuminate separate Rowland circle spectrograph channels equipped with holographically ruled diffraction gratings and delay line microchannel plate detectors. The telescope mirrors have a 352 x 387 mm aperture and 2245 mm focal length and are attached to actuator assemblies, which provide on-orbit, tip, tilt, and focus control. Two mirrors are coated with silicon carbide (SiC) and two are coated with lithium fluoride over aluminum (Al:LiF). We describe mirror assembly in-flight optical and mechanical performance. On-orbit measurements of the far-ultraviolet point spread function associated with each mirror are compared to expectations based on pre-flight laboratory measurements and modeling using the Optical Surface Analysis Code and surface metrology data. On-orbit imaging data indicate that the mirrors meet their instrument-level requirement of 50 percent and 95 percent slit transmission for the high- and mid-resolution spectrograph entrance slits, respectively. The degradation of mirror reflectivity during satellite integration and test is also discussed. The far-ultraviolet reflectivity of the SiC- and AlLiF-coated mirrors decreased about six percent and three percent, respectively, between coating and launch. Each mirror is equipped with three actuators, which consist of a stepper motor driving a ball screw via a two-stage planetary gear train. We also discuss the mechanical performance of the mirror assemblies, including actuator performance and thermal effects.
Performance of the Far Ultraviolet Spectroscopic Explorer mirror assemblies
NASA Astrophysics Data System (ADS)
Ohl, Raymond G.; Barkhouser, Robert H.; Conard, Steven J.; Friedman, Scott D.; Hampton, Jeffrey; Moos, H. Warren; Nikulla, Paul; Oliveira, Cristina M.; Saha, Timo T.
2000-12-01
The Far Ultraviolet Spectroscopic Explorer is a NASA astrophysics satellite which produces high-resolution spectra in the far-ultraviolet (90.5 - 118.7 nm bandpass) using a high effective area and low background detectors. The observatory was launched on its three-year mission from Cape Canaveral Air Station on 24 June 1999. The instrument contains four co- aligned, normal incidence, off-axis parabolic mirrors which illuminate separate Rowland circle spectrograph channels equipped with holographically ruled diffraction gratings and delay line microchannel plate detectors. The telescope mirrors have a 352 X 387 mm aperture and 2245 mm focal length and are attached to actuator assemblies, which provide on-orbit, tip, tilt, and focus control. Two mirrors are coated with silicon carbide (SiC) and two are coated with lithium fluoride over aluminum (Al:LiF). We describe mirror assembly in-flight optical and mechanical performance. On-orbit measurements of the far-ultraviolet point spread function associated with each mirror are compared to expectations based on pre-flight laboratory measurements and modeling using the Optical Surface Analysis Code and surface metrology data. On-orbit imaging data indicate that the mirrors meet their instrument-level requirement of 50% and 95% slit transmission for the high- and mid-resolution spectrograph entrance slits, respectively. The degradation of mirror reflectivity during satellite integration and test is also discussed. The FUV reflectivity of the SiC- and Al:LiF-coated mirrors decreased about 6% and 3%, respectively, between coating and launch. Each mirror is equipped with three actuators, which consist of a stepper motor driving a ball screw via a two-stage planetary gear train. We also discuss the mechanical performance of the mirror assemblies, including actuator performance and thermal effects.
International Space Station (ISS) Airlock Crewlock Depressurization Methods
NASA Technical Reports Server (NTRS)
Williams, David E.; Leonard, Daniel J.; Booth, Valori J.; Russell, Matt
2004-01-01
The International Space Station (ISS) Airlock Crewlock can be depressurized via various methods. The ISS Airlock is divided into two major sections, the Equipment Lock and Crewlock. The Equipment Lock, as the name indicates, contains the equipment to support EVA activities including Extravehicular Maneuvering/Mobility Unit (EMU) maintenance and refurbishment. The Equipment Lock also contains basic life support equipment in order to support denitrogenzation protocols while the Airlock is isolated from the rest of the ISS. The Crewlock is the section of the Airlock that is depressurized to allow for Extravehicular Activity (EVA) crewmembers to exit the ISS for performance of EVAs. As opposed to the Equipment Lock, the Crewlock is quite simple and basically just contains lights and an assembly to provide services, oxygen, coolant, etc, to the EMUs. For operational flexibility, various methods were derived for Crewlock depressurization. Herein these various different methods of ISS Airlock Crewlock depressurization will be described including their performance, impacts, and risks associated with each method. Each of the different methods will be discussed with flight data, if it exists. Models will be applied to flight cases and to other methods that have not been used on-orbit at this time.
1999-02-25
At Astrotech, Titusville, Fla., Harald Schnier and Manfred Nordhoff, with Daimler-Chrysler Aerospace (DASA), look over the International Cargo Carrier that will be used during future International Space Station (ISS) assembly missions. On top is Robert Wilkes, with Lockheed Martin. Behind the ladder in the background is Ben Greene, with Lockheed Martin. The nonpressurized ICC fits inside the payload bay of the orbiter. The ICC will carry the SPACEHAB Oceaneering Space System Box (SHOSS), a logistics items carrier. SHOSS can hold a maximum of 400 pounds of equipment and will carry items to be used during STS-96 and future ISS assembly flights. Also aboard the ICC will be the ORU Transfer Device (OTD), a U.S.-built crane that will be stowed on Unity for use during future ISS assembly missions. The ICC will fly on mission STS-96, targeted for launch on May 20
Portable Fan Assembly for the International Space Station
NASA Technical Reports Server (NTRS)
Jenkins, Arthur A.; Roman, Monsi C.
1999-01-01
NASA/ Marshall Space Flight Center (NASA/MSFC) is responsible for the design and fabrication of a Portable Fan Assembly (PFA) for the International Space Station (ISS). The PFA will be used to enhance ventilation inside the ISS modules as needed for crew comfort and for rack rotation. The PFA consists of the fan on-orbit replaceable unit (ORU) and two noise suppression packages (silencers). The fan ORU will have a mechanical interface with the Seat Track Equipment Anchor Assembly, in addition to the power supply module which includes a DC-DC converter, on/standby switch, speed control, power cable and connector. This paper provides a brief development history, including the criteria used for the fan, and a detailed description of the PFA operational configurations. Space Station requirements as well as fan performance characteristics are also discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Djang, Austin
2015-08-22
Thanks to the versatility of the beam lines at SSRL, research there is varied and benefits multiple fields. Each experiment requires a particular set of experiment equipment, which in turns requires its own particular assembly. As such, new engineering challenges arise from each new experiment. My role as an engineering intern has been to help solve these challenges, by designing and assembling experimental devices. My first project was to design a heated sample holder, which will be used to investigate the effect of temperature on a sample's x-ray diffraction pattern. My second project was to help set up an imagingmore » test, which involved designing a cooled grating holder and assembling multiple positioning stages. My third project was designing a 3D-printed pencil holder for the SSRL workstations.« less
A simple and inexpensive pulsing device for data-recording cameras
David L. Sonderman
1973-01-01
In some areas of forestry and wood utilization research, use of automatic data recording equipment has become commonplace. This research note describes the basic electronic components needed to modify an existing intervalometer into a simplified pulsing device for controlling an automatic data recording camera. The pulsing device is easily assembled and inexpensive,...
Growing a Primary Science Specialism: Assembling People, Places, Materials and Ideas
ERIC Educational Resources Information Center
Lynch, Julianne; Frankel, Nadine; McCarthy, Kerry; Sharp, Lindy
2015-01-01
This paper derives from the authors' experiences of the development of a successful science specialism implemented in a large primary school in regional Victoria, Australia, since 2012. We discuss how diverse resources--people, spaces, equipment, materials and ideas--were brought together to support a science specialism that focuses on positioning…
49 CFR 571.108 - Standard No. 108; Lamps, reflective devices, and associated equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... the headlamp. Headlamp test fixture means a device designed to support a headlamp or headlamp assembly... to 1% of design life, or other equivalent method. Semiautomatic headlamp beam switching device is one... signal lamp must be designed to conform to the performance requirements of the vibration test, moisture...
49 CFR 571.108 - Standard No. 108; Lamps, reflective devices, and associated equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... the headlamp. Headlamp test fixture means a device designed to support a headlamp or headlamp assembly... to 1% of design life, or other equivalent method. Semiautomatic headlamp beam switching device is one... signal lamp must be designed to conform to the performance requirements of the vibration test, moisture...
Pervaporation process and assembly
Wynn, Nicholas P.; Huang, Yu; Aldajani, Tiem; Fulton, Donald A.
2010-07-20
The invention is a pervaporation process and pervaporation equipment, using a series of membrane modules, and including inter-module reheating of the feed solution under treatment. The inter-module heating is achieved within the tube or vessel in which the modules are housed, thereby avoiding the need to repeatedly extract the feed solution from the membrane module train.
Wynn, Nicholas P [Redwood City, CA; Huang, Yu [Palo Alto, CA; Aldajani, Tiem [San Jose, CA; Fulton, Donald A [Fairfield, CA
2012-02-28
The invention is a pervaporation process and pervaporation equipment, using a series of membrane modules, and including inter-module reheating of the feed solution under treatment. The inter-module heating is achieved within the tube or vessel in which the modules are housed, thereby avoiding the need to repeatedly extract the feed solution from the membrane module train.
46 CFR 170.055 - Definitions concerning a vessel.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Barge means a vessel not equipped with a means of self-propulsion. (d) Beam or B means the maximum width... vessel's keel was laid; or (2) Construction identifiable with the vessel began and assembly of that... a vessel propelled only by sails. (q) Ship means a self-propelled vessel. (r) Tank vessel means a...
Code of Federal Regulations, 2012 CFR
2012-04-01
..., packaging, repackaging, labelling, or minor assembly do not ordinarily constitute physical alteration... affect the reliability of the comparison. Finally, the reliability of profit measures based on gross..., in the age of plant and equipment), business experience (such as whether the business is in a start...
Code of Federal Regulations, 2014 CFR
2014-04-01
..., packaging, repackaging, labelling, or minor assembly do not ordinarily constitute physical alteration... affect the reliability of the comparison. Finally, the reliability of profit measures based on gross..., in the age of plant and equipment), business experience (such as whether the business is in a start...
AUTOMOTIVE DIESEL MAINTENANCE 2. UNIT XXII, MICHIGAN/CLARK TRANSMISSION--CONVERTER/TRANSMISSION.
ERIC Educational Resources Information Center
Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.
THIS MODULE OF A 25-MODULE COURSE IS DESIGNED TO DEVELOP A DETAILED UNDERSTANDING OF A SPECIFIC POWER CONVERTER AND TRANSMISSION USED ON DIESEL POWERED EQUIPMENT. TOPICS ARE A CLOSER LOOK AT THE CONVERTER, CONVERTER ASSEMBLY AND INSTALLATION, TRANSMISSION FUNCTION, AND TRANSMISSION SHIFTING. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL PROGRAMED…
NASA Technical Reports Server (NTRS)
Gosbee, John; Stegmann, Barbara; Guess, Terrell M.
1991-01-01
The goal was to characterize the Health Maintenance Facility (HMF)-like mini-racks and drawers onboard the KC-135 as a test bed for the Space Station Freedom HMF racks. An additional goal was to evaluate the attachments, mounting points, and inner drawer assemblies of the mini-racks for various medical equipment and supplies. Results and recommendations are given.
DOE Office of Scientific and Technical Information (OSTI.GOV)
BUCHANAN, J.R.
2000-05-16
The purpose of this technical evaluation is to determine whether the secondary hoses are to be categorized as Commercial Grade Items (CGI) or Engineered Equipment. This determination will identify whether or not use of the CGI Dedication process is appropriate.
75 FR 20877 - Office of Hazardous Materials Safety; Notice of Application for Special Permits
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-21
... wrapped carbon fiber composite cylinders with seamless aluminum liners for the transportation in commerce... Coupler Integrated assembly). (modes 1, 4) 14988-N Luxfer Gas Cylinders, 49 CFR 173.302a, To authorize the...). materials in non-DOT specification cylinders which are not equipped with pressure relief devices. (modes 1...
30 CFR 36.27 - Fuel-supply system.
Code of Federal Regulations, 2014 CFR
2014-07-01
... tank by a chain or other fastening to prevent loss. (2) The fuel tank shall have a definite position in the equipment assembly, and no provision shall be made for attachment of separate or auxiliary fuel... continuously at full load for approximately four hours. (b) Fuel lines. All fuel lines shall be installed to...
30 CFR 36.27 - Fuel-supply system.
Code of Federal Regulations, 2012 CFR
2012-07-01
... tank by a chain or other fastening to prevent loss. (2) The fuel tank shall have a definite position in the equipment assembly, and no provision shall be made for attachment of separate or auxiliary fuel... continuously at full load for approximately four hours. (b) Fuel lines. All fuel lines shall be installed to...
30 CFR 36.27 - Fuel-supply system.
Code of Federal Regulations, 2011 CFR
2011-07-01
... tank by a chain or other fastening to prevent loss. (2) The fuel tank shall have a definite position in the equipment assembly, and no provision shall be made for attachment of separate or auxiliary fuel... continuously at full load for approximately four hours. (b) Fuel lines. All fuel lines shall be installed to...
30 CFR 36.27 - Fuel-supply system.
Code of Federal Regulations, 2013 CFR
2013-07-01
... tank by a chain or other fastening to prevent loss. (2) The fuel tank shall have a definite position in the equipment assembly, and no provision shall be made for attachment of separate or auxiliary fuel... continuously at full load for approximately four hours. (b) Fuel lines. All fuel lines shall be installed to...
30 CFR 36.27 - Fuel-supply system.
Code of Federal Regulations, 2010 CFR
2010-07-01
... tank by a chain or other fastening to prevent loss. (2) The fuel tank shall have a definite position in the equipment assembly, and no provision shall be made for attachment of separate or auxiliary fuel... continuously at full load for approximately four hours. (b) Fuel lines. All fuel lines shall be installed to...
NASA Technical Reports Server (NTRS)
2009-01-01
This Interim Standard establishes requirements for evaluation, testing, and selection of materials that are intended for use in space vehicles, associated Ground Support Equipment (GSE), and facilities used during assembly, test, and flight operations. Included are requirements, criteria, and test methods for evaluating the flammability, offgassing, and compatibility of materials.
Using thermography to detect misalignment in coupled equipment
NASA Astrophysics Data System (ADS)
Kelch, Craig K.; Grover, Paul E.
1996-03-01
This paper describes and reports the findings of a study performed by the Miller Brewing Company. The researchers assembled a test bed consisting of a motor and generator linked by seven different interchangeable flexible couplings. They then misaligned the motor and generator and used different predictive technologies to monitor any coupling changes.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 7 2012-10-01 2012-10-01 false Pelvis. 572.188 Section 572.188 Transportation... Percentile Adult Male § 572.188 Pelvis. (a) The pelvis (175-6000) is part of the torso assembly shown in drawing 175-0000. The pelvis is equipped with a pubic symphysis load sensor in conformance with § 572.189...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 7 2014-10-01 2014-10-01 false Pelvis. 572.188 Section 572.188 Transportation..., 50th Percentile Adult Male § 572.188 Pelvis. (a) The pelvis (175-6000) is part of the torso assembly shown in drawing 175-0000. The pelvis is equipped with a pubic symphysis load sensor in conformance with...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Pelvis. 572.188 Section 572.188 Transportation... Percentile Adult Male § 572.188 Pelvis. (a) The pelvis (175-6000) is part of the torso assembly shown in drawing 175-0000. The pelvis is equipped with a pubic symphysis load sensor in conformance with § 572.189...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 7 2013-10-01 2013-10-01 false Pelvis. 572.188 Section 572.188 Transportation..., 50th Percentile Adult Male § 572.188 Pelvis. (a) The pelvis (175-6000) is part of the torso assembly shown in drawing 175-0000. The pelvis is equipped with a pubic symphysis load sensor in conformance with...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 7 2011-10-01 2011-10-01 false Pelvis. 572.188 Section 572.188 Transportation... Percentile Adult Male § 572.188 Pelvis. (a) The pelvis (175-6000) is part of the torso assembly shown in drawing 175-0000. The pelvis is equipped with a pubic symphysis load sensor in conformance with § 572.189...
Bypass control valve seal and bearing life cycle test report
NASA Technical Reports Server (NTRS)
Lundback, A. V.
1972-01-01
The operating characteristics of a bypass control valve seal and bearing life cycle tests are reported. Data from the initial assembly, leak, torque, and deflection tests are included along with the cycle life test results and conclusions. The equipment involved was to be used in the nuclear engine for the rocket vehicles program.
Kill operation requires thorough analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abel, L.W.
1995-05-15
Full control of a blowout well requires a properly designed post-capping kill operation because failures in regaining well control usually occur during the kill operation, not during capping. Capping (the installation of pressure control or diverter equipment on the wellhead) is generally very reliable in gaining control of a blowout well. The following techniques are some of the viable means of killing blowout wells once the capping assemblies are in place: direct shut in of the flow; bullheading; momentum kill; volumetric control for migration of fluids or lubrication after migration ceases; and dynamic kills (friction-based dynamic kills or mass flowmore » rate kills) The objective of most post-capping operations is to stop the flow and put the well under hydrostatic control. The means of killing a blowout once capping assemblies are in place should be chosen with care to avoid problems such as cratering, equipment failure, and underground blowouts. The particular circumstances and well integrity will dictate which kill method will be the most viable. Each of these five methods are explained.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-05-01
This final report is a compilation of final reports from each of the groups participating in the program. The main three groups involved in this effort are the Thomas J. Watson Research Center of IBM Corporation in Yorktown Heights, New York, Assembly Process Design of IBM Corporation in Endicott, New York, and SMT Laboratory of Universal Instruments Corporation in Binghamton, New York. The group at the research center focused on the conductive adhesive materials development and characterization. The group in process development focused on processing of the Polymer-Metal-Solvent Paste (PMSP) to form conductive adhesive bumps, formation of the Polymer-Metal Compositemore » (PMC) on semiconductor devices and study of the bonding process to circuitized organic carriers, and the long term durability and reliability of joints formed using the process. The group at Universal Instruments focused on development of an equipment set and bonding parameters for the equipment to produce bond assembly tooling. Reports of each of these individual groups are presented here reviewing their technical efforts and achievements.« less
1998-12-01
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, Center Director Roy Bridges (left), Program Manager of the International Space Station (ISS) Randy Brinkley (second from left) and STS-98 Commander Ken Cockrell (right) applaud the unveiling of the name "Destiny" for the U.S. Laboratory module. The lab, which is behnd them on a workstand, is scheduled to be launched on STS-98 on Space Shuttle Endeavour in early 2000. It will become the centerpiece of scientific research on the ISS. The Shuttle will spend six days docked to the Station while the laboratory is attached and three spacewalks are conducted to compete its assembly. The laboratory will be launched with five equipment racks aboard, which will provide essential functions for Station systems, including high data-rate communications, and maintain the Station's orientation using control gyroscopes launched earlier. Additional equipment and research racks will be installed in the laboratory on subsequent Shuttle flights.
Retrofitting Steam Turbines with Expired Service Life
NASA Astrophysics Data System (ADS)
Dubrovskii, V. G.; Zubov, A. P.; Koshelev, S. A.; Babiev, A. N.; Kremer, V. L.
2018-06-01
Many pieces of equipment installed at thermal power stations (TPS) have an expired service life or are close to expiry and are obsolete. In addition, the structure of heat consumption by end users has changed. Among the ways for solving the problem of aging equipment is the retrofitting of turbines that allows for service life recovery and improvement of their performance to the modern level. The service life is recovered through replacement of high-temperature assemblies and parts of a turbine, and the performance is improved by retrofitting and major overhaul of low-temperature assemblies. Implementation of modern engineering solutions and numerical methods in designing upgraded flow paths of steam turbines considerably improves the turbine effectiveness. New flow paths include sabre-like guide vanes, integrally-machined shrouds, and effective honeycomb or axial-radial seals. The flow paths are designed using optimization and hydraulic simulation methods as well as approaches for improving the performance on the turbine blading and internal steam flow paths. Retrofitting of turbines should be performed to meet the customers' needs. The feasibility of implementation of one or another alternative must be determined on a case-by-case basis depending on the turbine conditions, the availability of reserves for generating live steam and supplying circulation water, and the demands and capacities for generation and delivery of power and heat. The main principle of retrofitting is to retain the foundation and the auxiliary and heat-exchange equipment that is fit for further operation. With the example of PT-60-130 and T-100-130, the experience is presented of a comprehensive approach to retrofitting considering the customer's current needs and the actual equipment conditions. Due to the use of modern engineering solutions and procedures, retrofitting yields updating and upgrading of the turbine at a relatively low cost.
NASA Astrophysics Data System (ADS)
Kurnik, C.; Austin, K.; Coyle, B.; Dittmann, T.; Feaux, K.; Friesen, B.; Johnson, W.; Mencin, D.; Pauk, B.; Walls, C.
2007-12-01
The Plate Boundary Observatory (PBO), part of the NSF-funded EarthScope project, is designed to study the three- dimensional strain field resulting from deformation across the active boundary zone between the Pacific and North American plates in the western United States. To meet these goals, UNAVCO will install 880 continuous GPS stations, 103 borehole strainmeter stations, 28 tiltmeters, and five laser strainmeters by October 2008. Such a broad network presents significant logisitical challenges, including moving supplies, equipment, and personnel around 6 million square kilometers, and this requires accurate tracking and careful planning. The PBO logistics chain includes the PBO headquarters at UNAVCO in Boulder, Colorado and five regional offices in the continental United States and Alaska, served by dozens of suppliers spread across the globe. These offices are responsible for building and maintaining sites in their region. Most equipment and supplies first arrive in Boulder, where they are tagged and entered into a UNAVCO-wide equipment database, assembled and quality checked as necessary, and sent on to the appropriate regional office. Larger items which are costly to store and ship from Boulder, such as batteries or long sections of stainless steel pipe and bar required for monuments, are shipped directly from the supplier to each region as needed. These supplies and equipment are also tracked through the ordering, delivery, installation, and maintenance cycle via Earned Value Management techniques which allow us to meet NSF and other Federal procurement rules. Early prototypes and assembly configurations aid the development of material and supply budgets. A thorough understanding of Federal procurement rules at project start up is critical as the project moves forward.
2003-11-17
KENNEDY SPACE CENTER, FLA. - The crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, away from the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. In the distance, at left, is Launch Pad 39A. The water on the right of the crawlerway is the Banana River. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.
2003-11-21
KENNEDY SPACE CENTER, FLA. - Seen across the water of the Launch Complex 39 turn basin, a crawler-transporter, carrying Mobile Launcher Platform (MLP) number 3 with a set of twin solid rocket boosters bolted atop, crawls out of the 525-foot-tall Vehicle Assembly Building during the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.
2003-11-17
KENNEDY SPACE CENTER, FLA. - Viewed across the turn basin in the Launch Complex 39 Area, the crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, away from the Vehicle Assembly Building (VAB). The journey is in support of engineering analysis vibration tests on the crawler and MLP. The water on the right of the crawlerway is the Banana River. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.
High-Speed Isolation Board for Flight Hardware Testing
NASA Technical Reports Server (NTRS)
Yamamoto, Clifford K.; Goodpasture, Richard L.
2011-01-01
There is a need to provide a portable and cost-effective galvanic isolation between ground support equipment and flight hardware such that any unforeseen voltage differential between ground and power supplies is eliminated. An interface board was designed for use between the ground support equipment and the flight hardware that electrically isolates all input and output signals and faithfully reproduces them on each side of the interface. It utilizes highly integrated multi-channel isolating devices to minimize size and reduce assembly time. This single-board solution provides appropriate connector hardware and breakout of required flight signals to individual connectors as needed for various ground support equipment. The board utilizes multi-channel integrated circuits that contain transformer coupling, thereby allowing input and output signals to be isolated from one another while still providing high-fidelity reproduction of the signal up to 90 MHz. The board also takes in a single-voltage power supply input from the ground support equipment and in turn provides a transformer-derived isolated voltage supply to power the portion of the circuitry that is electrically connected to the flight hardware. Prior designs used expensive opto-isolated couplers that were required for each signal to isolate and were time-consuming to assemble. In addition, these earlier designs were bulky and required a 2U rack-mount enclosure. The new design is smaller than a piece of 8.5 11-in. (.22 28-mm) paper and can be easily hand-carried where needed. The flight hardware in question is based on a lineage of existing software-defined radios (SDRs) that utilize a common interface connector with many similar input-output signals present. There are currently four to five variations of this SDR, and more upcoming versions are planned based on the more recent design.
Assembly & Metrology of First Wall Components of SST-1
NASA Astrophysics Data System (ADS)
Parekh, Tejas; Santra, Prosenjit; Biswas, Prabal; Patel, Hiteshkumar; Paravastu, Yuvakiran; Jaiswal, Snehal; Chauhan, Pradeep; Babu, Gattu Ramesh; A, Arun Prakash; Bhavsar, Dhaval; Raval, Dilip C.; Khan, Ziauddin; Pradhan, Subrata
2017-04-01
First Wall Components (FWC) of SST-1 tokamak, which are in the immediate vicinity of plasma comprises of limiters, divertors, baffles, passive stabilizers are designed to operate long duration (1000 s) discharges of elongated plasma. All FWC consists of a copper alloy heat sink modules with SS cooling tubes brazed onto it, graphite tiles acting as armour material facing the plasma, and are mounted to the vacuum vessels with suitable Inconel support structures at ring & port locations. The FWC are very recently assembled and commissioned successfully inside the vacuum vessel of SST-1 undergoing a meticulous planning of assembly sequence, quality checks at every stage of the assembly process. This paper will present the metrology aspects & procedure of each FWC, both outside the vacuum vessel, and inside the vessel, assembly tolerances, tools, equipment and jig/fixtures, used at each stage of assembly, starting from location of support bases on vessel rings, fixing of copper modules on support structures, around 3800 graphite tile mounting on 136 copper modules with proper tightening torques, till final toroidal and poloidal geometry of the in-vessel components are obtained within acceptable limits, also ensuring electrical continuity of passive stabilizers to form a closed saddle loop, electrical isolation of passive stabilizers from vacuum vessel.
Open-Section Composite Structural Elements
NASA Technical Reports Server (NTRS)
Loftin, T. A.; Smith, C. A.; Raheb, S. J.; Nowitzky, A. M.
1991-01-01
Report describes investigation of manufacture and mechanical properties of graphite-fiber/aluminum-matrix open-section structural elements; e.g., channels and angle bars. Conducted with view toward using such elements to build lightweight, thermally stable truss structures in outer space. Other applications transport to, and assembly at, remote or otherwise uninviting locations. Advantages include shapes permitting high packing density during shipment, convenient paths for routing tubes, hoses, and cables; accessibility of both inner and outer surfaces for repair; and ease of attachment of additional hardware. Easier and require less equipment to fabricate, and more amenable to automated fabrication and assembly at remote site. Disadvantages, not as resistant to some kinds of deformation under load.
The role of Space Station Freedom in the Human Exploration Initiative
NASA Technical Reports Server (NTRS)
Ahlf, P. R.; Saucillo, R. J.; Meredith, B. D.; Peach, L. L.
1990-01-01
Exploration accommodation requirements for Space Station Freedom (SSF) and mission-supporting capabilities have been studied. For supporting the Human Exploration Initiative (HEI), SSF will accommodate two functions with augmentations to the baseline Assembly Complete configuration. First, it will be an earth-orbiting transportation node providing facilities and resources (crew, power, communications) for space vehicle assembly, testing, processing and postflight servicing. Second, it will be an in-space laboratory for science research and technology development. The evolutionary design of SSF will allow the on-orbit addition of pressurized laboratory and habitation modules, power generation equipment, truss structure, and unpressurized vehicle processing platforms.
Independent Orbiter Assessment (IOA): Analysis of the crew equipment subsystem
NASA Technical Reports Server (NTRS)
Sinclair, Susan; Graham, L.; Richard, Bill; Saxon, H.
1987-01-01
The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA approach features a top-down analysis of the hardware to determine failure modes, criticality, and potential critical (PCIs) items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. The independent analysis results coresponding to the Orbiter crew equipment hardware are documented. The IOA analysis process utilized available crew equipment hardware drawings and schematics for defining hardware assemblies, components, and hardware items. Each level of hardware was evaluated and analyzed for possible failure modes and effects. Criticality was assigned based upon the severity of the effect for each failure mode. Of the 352 failure modes analyzed, 78 were determined to be PCIs.
Dynamic Simulation on the Installation Process of HGIS in Transformer Substation
NASA Astrophysics Data System (ADS)
Lin, Tao; Li, Shaohua; Wang, Hu; Che, Deyong; Qi, Guangcai; Yao, Jianfeng; Zhang, Qingzhe
The technological requirements of Hypid Gas Insulated Switchgear (HGIS) installation in transformer substation is high and the control points of quality is excessive. Most of the engineers and technicians in the construction enterprises are not familiar with equipments of HGIS. In order to solve these problem, equipments of HGIS is modeled on the computer by SolidWorks software. Installation process of civil foundation and closed-type equipments is optimized dynamically with virtual assemble technology. Announcements and application work are composited into animation file. Skills of modeling and simulation is tidied classify as well. The result of the visual dynamic simulation can instruct the actual construction process of HGIS to a certain degree and can promote reasonable construction planning and management. It can also improve the method and quality of staff training for electric power construction enterprises.
NASA Astrophysics Data System (ADS)
Hua, Feng
Nanoparticles are exciting materials because they exhibit unique electronic, catalytic, and optical properties. As a novel and promising nanobuilding block, it attracts considerable research efforts in its integration into a wide variety of thin film devices. Nanoparticles were adsorbed onto the substrate with layer-by-layer self-assembly which becomes of great interest due to its suitability in colloid particle assembly. Without extremely high temperatures and sophisticated equipment, molecularly organized films in an exactly pre-designed order can grow on almost all the substrates in nature. Two approaches generating spatially separated patterns comprised of nanoparticles are demonstrated, as well as two approaches patterning more than one type of nonoparticle on a silicon wafer. The structure of the thin film patterned by these approaches are analyzed and considered suitable to the thin film device. Finally, the combination of lithography and layer-by-layer (lbl) self-assembly is utilized to realize the microelectronic device with functional nonoparticles. The lbl self-assembly is the way to coat the nonoparticles and the lighography to pattern them. Based on the coating and patterning technique, a MOS-capacitor, a MOS field-effect-transistor and magnetic thin film cantilever are fabricated.
Irradiation caused performance losses of undulators equipped with Sm2Co17 magnets
NASA Astrophysics Data System (ADS)
Heidrich, S.; Aulenbacher, K.; Donders, S.; Nikipelov, A.
2018-06-01
The effects of beam losses on the performance of undulators equipped with Sm2Co17 magnets were investigated at the 855 MeV beamline of the Mainzer Microtron MAMI. Therefore, different cases containing undulator components as well as complete undulator assemblies were irradiated. Different types of shielding were used to distinguish the magnetic field degradation caused by neutrons from the degradation caused by electrons and photons. The results of each case were put in relation with the expected beam losses of a conceptional 10 kW free-electron-laser (FEL) based on an electron beam with 34 MW beam power.
Repair of major system elements on Skylab
NASA Technical Reports Server (NTRS)
Pace, R. E., Jr.
1975-01-01
In-flight maintenance, as conceived and pre-planned for the Skylab Mission, was limited to simple scheduled and unscheduled replacement tasks and minor contingency repairs. Failures during the mission dictated complicated and sophisticated repairs to major systems so that the mission could continue. These repairs include the release of a large structure that failed to deploy, the assembly and deployment of large mechanical devices, the installation and checkout of precision electronic equipment, troubleshooting and repair of precision electromechanical equipment and tapping into and recharging a cooling system. The Skylab experience proves conclusively that crewmen can, with adequate training, make major system repairs in space using standard or special tools.
STS-88 Mission Specialists Currie and Ross inside Endeavour
NASA Technical Reports Server (NTRS)
1998-01-01
STS-88 Mission Specialists Nancy J. Currie, Ph.D., (back) and Jerry L. Ross (front) check over equipment inside orbiter Endeavour during Terminal Countdown Demonstration Activities (TCDT). The TCDT includes mission familiarization activities, emergency egress training, and the simulated main engine cut-off exercise. Mission STS-88 is targeted for launch on Dec. 3, 1998. It is the first U.S. flight for the assembly of the International Space Station and will carry the Unity connecting module. Unity will be mated with the already orbiting Russian-built Zarya control module. The 12-day mission includes three planned spacewalks to connect power, data and utility lines and install exterior equipment.
36 CFR Appendix C to Part 1191 - Architectural Barriers Act: Scoping
Code of Federal Regulations, 2014 CFR
2014-07-01
.... That portion of a room or space where the play or practice of a sport occurs. Assembly Area. A building... devices to bypass the acoustical space between a sound source and a listener by means of induction loop, radio frequency, infrared, or direct-wired equipment. Boarding Pier. A portion of a pier where a boat is...
49 CFR 571.108 - Standard No. 108; Lamps, reflective devices, and associated equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... which the headlamp is in the design open operating position. Headlamp concealment device means a device.... Headlamp test fixture means a device designed to support a headlamp or headlamp assembly in the test... (other than a standardized sealed beam headlamp designed to conform to paragraph S7.3 or a replaceable...
Working, Welding and Structural Drafting, Drafting--Intermediate: 9255.03.
ERIC Educational Resources Information Center
Dade County Public Schools, Miami, FL.
The course introduces the student to working welding drawings, both detail and assembly, as related to all fields of drafting and structural drafting, and provides him with the opportunity to work with various types of tools and equipment. Prior to entry in this course, the vocational student must display mastery of the skills indicated in…
NASA Technical Reports Server (NTRS)
1976-01-01
Development of the F/48, F/96 Planetary Camera for the Large Space Telescope is discussed. Instrument characteristics, optical design, and CCD camera submodule thermal design are considered along with structural subsystem and thermal control subsystem. Weight, electrical subsystem, and support equipment requirements are also included.
Mobilizing and Equipping Senior Adults at Crowley Assembly of God for Spiritual and Social Ministry
ERIC Educational Resources Information Center
Crane, Alfred Lee, III
2017-01-01
Senior adults face a quandary through the process of aging. While enjoying the benefits of retirement, the senior adult also struggles with issues of health, independence, loneliness, and society's stereotypes concerning their relevance and usefulness. With the aging of the population and graying of the church membership, the necessity to mobilize…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-20
... hydraulic fluid contamination, which can cause cracking of titanium parts in the system disconnect assembly, resulting in compromise of the engine firewall. A cracked firewall can allow fire in the engine area to enter the strut and can lead to an uncontained engine strut fire if flammable fluid is present. Cracking...
29 CFR 1926.405 - Wiring methods, components, and equipment for general use.
Code of Federal Regulations, 2010 CFR
2010-07-01
... conductors shall be run as multiconductor cord or cable assemblies or within raceways; or, where not subject to physical damage, they may be run as open conductors on insulators not more than 10 feet (3.05 m) apart. (B) Branch circuits shall originate in a power outlet or panelboard. Conductors shall be run as...
29 CFR 1926.405 - Wiring methods, components, and equipment for general use.
Code of Federal Regulations, 2011 CFR
2011-07-01
... conductors shall be run as multiconductor cord or cable assemblies or within raceways; or, where not subject to physical damage, they may be run as open conductors on insulators not more than 10 feet (3.05 m) apart. (B) Branch circuits shall originate in a power outlet or panelboard. Conductors shall be run as...
29 CFR 1926.405 - Wiring methods, components, and equipment for general use.
Code of Federal Regulations, 2014 CFR
2014-07-01
... conductors shall be run as multiconductor cord or cable assemblies or within raceways; or, where not subject to physical damage, they may be run as open conductors on insulators not more than 10 feet (3.05 m) apart. (B) Branch circuits shall originate in a power outlet or panelboard. Conductors shall be run as...
29 CFR 1926.405 - Wiring methods, components, and equipment for general use.
Code of Federal Regulations, 2013 CFR
2013-07-01
... conductors shall be run as multiconductor cord or cable assemblies or within raceways; or, where not subject to physical damage, they may be run as open conductors on insulators not more than 10 feet (3.05 m) apart. (B) Branch circuits shall originate in a power outlet or panelboard. Conductors shall be run as...
29 CFR 1926.405 - Wiring methods, components, and equipment for general use.
Code of Federal Regulations, 2012 CFR
2012-07-01
... conductors shall be run as multiconductor cord or cable assemblies or within raceways; or, where not subject to physical damage, they may be run as open conductors on insulators not more than 10 feet (3.05 m) apart. (B) Branch circuits shall originate in a power outlet or panelboard. Conductors shall be run as...
Study of solid rocket motor for space shuttle booster, volume 2, book 2
NASA Technical Reports Server (NTRS)
1972-01-01
A technical analysis of the solid propellant rocket engines for use with the space shuttle is presented. The subjects discussed are: (1) solid rocket motor stage recovery, (2) environmental effects, (3) man rating of the solid propellant rocket engines, (4) system safety analysis, (5) ground support equipment, and (6) transportation, assembly, and checkout.
Design of a hydraulic bending machine
Steven G. Hankel; Marshall Begel
2004-01-01
To keep pace with customer demands while phasing out old and unserviceable test equipment, the staff of the Engineering Mechanics Laboratory (EML) at the USDA Forest Service, Forest Products Laboratory, designed and assembled a hydraulic bending test machine. The EML built this machine to test dimension lumber, nominal 2 in. thick and up to 12 in. deep, at spans up to...
PREIRRADIATION MEASUREMENTS OF PIQUA FUEL ELEMENTS NO. P-1111, P-1113, P- 1114, AND P-1120
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hubbell, H.J.
1962-11-01
Results of preirradiation measurements and tests performed during the processing and assembly of the individual fuel cylinders contained in Piqua Fuel Elements No. P-1111, P-1113, P-1114, and P-1120 are presented. A description of the techniques and equipment used in obtaining the data is also included. (auth)
75 FR 6854 - Airworthiness Directives; Dassault-Aviation Model Falcon 900EX Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-12
... and passenger Right-Hand (RH) oxygen lines may both interfere with the frame 8 of the aeroplane structure. A subsequent design review of the oxygen lines routing has confirmed that, on certain aeroplanes, equipped in RH mid-cabin with a 115 cu-ft oxygen cylinder, the installation of the line support assembly at...
ERIC Educational Resources Information Center
Manpower Administration (DOL), Washington, DC. U.S. Training and Employment Service.
The United States Training and Employment Service General Aptitude Test Battery (GATB), first published in 1947, has been included in a continuing program of research to validate the tests against success in many different occupations. The GATB consists of 12 tests which measure nine aptitudes: General Learning Ability; Verbal Aptitude; Numerical…
ERIC Educational Resources Information Center
Manpower Administration (DOL), Washington, DC. U.S. Training and Employment Service.
The United States Training and Employment Service General Aptitude Test Battery (GATB), first published in 1947, has been included in a continuing program of research to validate the tests against success in many different occupations. The GATB consists of 12 tests which measure nine aptitudes: General Learning Ability; Verbal Aptitude; Numerical…
STS-88 crew members and technicians participate in their CEIT in the SSPF
NASA Technical Reports Server (NTRS)
1997-01-01
Pilot Rick Sturckow and Mission Specialist Jerry Ross, both members of the STS-88 crew, participate with technicians in the Crew Equipment Interface Test for that mission in KSC's Space Station Processing Facility. STS-88, the first International Space Station assembly flight, is targeted for launch in July 1998 aboard Space Shuttle Endeavour.
Code of Federal Regulations, 2010 CFR
2010-10-01
... designed for use in a succession of experimental programs over a longer period of time. Examples of loop...) Experimental development of equipment, processes, or devices, including assembly, fitting, installation... for the purpose of conducting a test or experiment. The design may be only conceptual in character...
Code of Federal Regulations, 2013 CFR
2013-10-01
... designed for use in a succession of experimental programs over a longer period of time. Examples of loop...) Experimental development of equipment, processes, or devices, including assembly, fitting, installation... for the purpose of conducting a test or experiment. The design may be only conceptual in character...
Code of Federal Regulations, 2012 CFR
2012-10-01
... designed for use in a succession of experimental programs over a longer period of time. Examples of loop...) Experimental development of equipment, processes, or devices, including assembly, fitting, installation... for the purpose of conducting a test or experiment. The design may be only conceptual in character...
47 CFR 2.803 - Marketing of radio frequency devices prior to equipment authorization.
Code of Federal Regulations, 2014 CFR
2014-10-01
... device that is in the conceptual, developmental, design or pre-production stage may be offered for sale...) The following notice is included with the kit: FCC NOTICE: This kit is designed to allow: (1) Product... stations and that this product accept harmful interference. Unless the assembled kit is designed to operate...
47 CFR 2.803 - Marketing of radio frequency products prior to equipment authorization.
Code of Federal Regulations, 2013 CFR
2013-10-01
... device that is in the conceptual, developmental, design or pre-production stage may be offered for sale...) The following notice is included with the kit: FCC NOTICE: This kit is designed to allow: (1) Product... stations and that this product accept harmful interference. Unless the assembled kit is designed to operate...
Code of Federal Regulations, 2011 CFR
2011-10-01
... designed for use in a succession of experimental programs over a longer period of time. Examples of loop...) Experimental development of equipment, processes, or devices, including assembly, fitting, installation... for the purpose of conducting a test or experiment. The design may be only conceptual in character...
Code of Federal Regulations, 2014 CFR
2014-10-01
... designed for use in a succession of experimental programs over a longer period of time. Examples of loop...) Experimental development of equipment, processes, or devices, including assembly, fitting, installation... for the purpose of conducting a test or experiment. The design may be only conceptual in character...
Inexpensive Raman Spectrometer for Undergraduate and Graduate Experiments and Research
ERIC Educational Resources Information Center
Mohr, Christian; Spencer, Claire L.; Hippler, Michael
2010-01-01
We describe the construction and performance of an inexpensive modular Raman spectrometer that has been assembled in the framework of a fourth-year undergraduate project (costs below $5000). The spectrometer is based on a 4 mW 532 nm green laser pointer and a compact monochromator equipped with glass fiber optical connections, linear detector…
Horizontal wells in the Java Sea
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barrett, S.L.; Lyon, R.
1988-05-01
The utilization of the Navigation Drilling System in recent drilling activity has established that: Continuous build rates as high as 6.75 degrees/100 ft are achievable (with a .74 degree DTU), making possible the tapping of near platform reserves. The system provides the flexibility necessary to drill a continuous curve or an irregular path without bottomhole assembly changes. The system provides the flexibility for sidetracks to the ''low side'' of the well bore without coming out of the hole for bottomhole assembly changes or a cement plug. Geological objectives can be reached with a high degree of accuracy. The system greatlymore » reduces the costly learning curve associated with rotary bottomhole assemblies and substantially increases the confidence of the operator. Significant drilling cost reductions resulted from the use of the system. The cost per foot was further reduced as additional familiarity with the equipment was gained.« less
Transport of LCLS-II 1.3 Ghz cryomodule to SLAC
DOE Office of Scientific and Technical Information (OSTI.GOV)
McGee, M. W.; Arkan, T.; Peterson, T.
2016-06-30
In a partnership with SLAC National Accelerator Laboratory (SLAC) and Jefferson Lab, Fermilab will assemble and test 17 of the 35 total 1.3 GHz cryomodules for the Linac Coherent Light Source II (LCLS-II) Project. These include a prototype built and delivered by each Lab. Another two 3.9 GHz cryomodules will be built, tested and transported by Fermilab to SLAC. Each assembly will be transported over-the-road from Fermilab or Jefferson Lab using specific routes to SLAC. The transport system consists of a base frame, isolation fixture and upper protective truss. The strongback cryomodule lifting fixture is described along with other supportingmore » equipment used for both over-the-road transport and local (on-site) transport at Fermilab. Initially, analysis of fragile components and stability studies will be performed in order to assess the risk associated with over-the-road transport of a fully assembled cryomodule.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1979-10-01
The primary objective of this program is to develop and demonstrate an improved PWR fuel assembly design capable of batch average burnups of 45,000-50,000 MWd/mtU. To accomplish this, a number of technical areas must be investigated to verify acceptable extended-burnup fuel performance. This report is the first semi-annual progress report for the program, and it describes work performed during the July-December 1978 time period. Efforts during this period included the definition of a preliminary design for a high-burnup fuel rod, physics analyses of extended-burnup fuel cycles, studies of the physics characteristics of changes in fuel assembly metal-to-water ratios, and developmentmore » of a design concept for post-irradiation examination equipment to be utilized in examining high-burnup lead-test assemblies.« less
NASA Technical Reports Server (NTRS)
Gentry, Gregory J.; Cover, John
2015-01-01
Nov 2, 2014 marked the completion of the 14th year of continuous human presence in space on board the International Space Station (ISS). After 42 expedition crews, over 115 assembly & utilization flights, over 180 combined Shuttle/Station, US & Russian Extravehicular Activities (EVAs), the post-Assembly-Complete ISS continues to fly and the engineering teams continue to learn from operating its systems, particularly the life support equipment. Problems with initial launch, assembly and activation of ISS elements have given way to more long term system operating trends. New issues have emerged, some with gestation periods measured in years. Major events and challenges for each U.S. Environmental Control and Life Support (ECLS) subsystem occurring during calendar years 2010 through 2014 are summarily discussed in this paper, along with look-aheads for what might be coming in the future for each U.S. ECLS subsystem.
STS-52 deployment of LAGEOS / IRIS spacecraft from OV-102's payload bay (PLB)
NASA Technical Reports Server (NTRS)
1992-01-01
During STS-52 deployment activities, the Italian Research Interim Stage (IRIS), a spinning solid fuel rocket, lifts the Laser Geodynamic Satellite II (LAGEOS II) out of its support cradle and above the thermal shield aboard Columbia, Orbiter Vehicle (OV) 102. The remote manipulator system (RMS) arm, with Material Exposure in Low Earth Orbit (MELEO), is positioned above the port side sill longeron. On the mission-peculiar equipment support structure (MPESS) carriers in the center foreground is the United States (U.S.) Microgravity Payload 1 (USMP-1) with Space Acceleration Measurement System (SAMS), MEPHISTO (its French abbreviation), Lambda Point Experiment (LPE) cryostat assembly (identified by JPL insignia), and LPE vacuum maintenance assembly. Other payload bay (PLB) experiments visible in this image include: (on the starboard wall (left)) the Canadian Experiments 2 (CANEX-2) Space Vision System (SVS) Canadian Target Assembly (CTA) (foreground) and the Attitude Sensor Package (ASP);
Design of plywood and paper flywheel rotors
NASA Astrophysics Data System (ADS)
Hagen, D. L.
Technical and economic design factors of cellulosic rotors are compared with conventional materials for stationary flywheel energy storage systems. Wood species, operation in a vacuum, assembly and costs of plywood rotors are evaluated. Wound kraft paper, twine and veneer rotors are examined. Two bulb attachments are designed. Support stiffness is shown to be constrained by the material strength, rotor configuration and speed ratio. Plywood moisture equilibrium during manufacture and assembly is critical. Disk shaping and rotor assembly are described. Potential self-centering dynamic balancing methods and equipment are described. Detailed measurements of the distribution of strengths, densities and specific energy of conventional Finnish Birch plywood and of custom made hexagonal Birch plywood are detailed. High resolution tensile tests were performed while monitoring the acoustic emissions with micoprocessor controlled data acquisition. Preliminary duration of load tests were performed on vacuum dried hexagonal birch plywood. Economics of cellulosic and conventional rotors were examined.
Testing the equipment for the cryogenic optical test of the James Webb Space Telescope
NASA Astrophysics Data System (ADS)
Whitman, Tony L.; Dziak, K. J.; Huguet, Jesse; Knight, J. Scott; Reis, Carl; Wilson, Erin
2014-08-01
After integration of the Optical Telescope Element (OTE) to the Integrated Science Instrument Module (ISIM) to become the OTIS, the JWST optics are tested at NASA's Johnson Space Center (JSC) in the cryogenic vacuum Chamber A for alignment and optical performance. Tens of trucks full of custom test equipment are being delivered to the JSC, in addition to the large pieces built at the Center, and the renovation of the chamber itself. The facility is tested for the thermal stability control for optical measurements and contamination control during temperature transitions. The support for the OTIS is also tested for thermal stability control, load tested in the cryogenic environment, and tested for isolation of the background vibration for the optical measurements. The Center of Curvature Optical Assembly (COCOA) is tested for the phasing and wavefront error (WFE) measurement of an 18 segment mirror and for cryogenic operation. A photogrammetry system is tested for metrology performance and cryogenic operation. Test mirrors for auto-collimation measurements are tested for optical performance and cryogenic operation. An assembly of optical test sources are calibrated and tested in a cryogenic environment. A Pathfinder telescope is used as a surrogate telescope for cryogenic testing of the OTIS optical test configuration. A Beam Image Analyzer (BIA) is used as a surrogate ISIM with the Pathfinder in this test. After briefly describing the OTIS optical test configuration, the paper will overview the list and configuration of significant tests of the equipment leading up to the OTIS test.
Imaging of Nuclear Weapon Trainers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schwellenbach, David
2017-12-06
The Configurable Muon Tracker (CMT) is an adaptation of the existing drift tube detector commercially available from Decision Sciences International Corporation (DSIC). NSTec engineered the CMT around commercially available drift tube assemblies to make a detector that is more versatile than previous drift tube assemblies. The CMT became operational in February 2013. Traditionally, cosmic-ray muon trackers rely on near-vertical trajectory muons for imaging. Since there are scenarios where imaging using vertical trajectory muons is not practical, NSTec designed the CMT specifically for quick configurability to track muons from any trajectory. The CMT was originally designed to be changed from verticalmore » imaging mode to horizontal imaging mode in a few hours with access to a crane or other lifting equipment. In FY14, locations for imaging weapon trainers and SNM were identified and it was determined that lifting equipment would not typically be available in experimental areas. The CMT was further modified and a portable lifting system was developed to allow reconfiguration of the CMT without access to lifting equipment at the facility. This system was first deployed at Los Alamos National Laboratory’s W-division, where several trainers were imaged in both horizontal and vertical modes. Real-time images have been compared in both modes showing that imaging can be done in both modes with the expected longer integration time for horizontal mode. Further imaging and post processing of the data is expected to continue into early FY15.« less
1998-10-03
KENNEDY SPACE CENTER, FLA. -- Inside the payload bay of Space Shuttle orbiter Endeavour in Orbiter Processing Facility Bay 1, STS-88 Mission Specialists Jerry L. Ross (crouching at left) and James H. Newman (far right) get a close look at equipment. Looking on is Wayne Wedlake (far left), with United Space Alliance at Johnson Space Center, and a KSC worker (behind Newman) who is operating the movable work platform or bucket. The STS-88 crew members are participating in a Crew Equipment Interface Test (CEIT), familiarizing themselves with the orbiter's midbody and crew compartments. Targeted for liftoff on Dec. 3, 1998, STS-88 will be the first Space Shuttle launch for assembly of the International Space Station (ISS). The primary payload is the Unity connecting module which will be mated to the Russian-built Zarya control module, expected to be already on orbit after a November launch from Russia. After the mating, Ross and Newman are scheduled to perform three spacewalks to connect power, data and utility lines and install exterior equipment. The first major U.S.-built component of ISS, Unity will serve as a connecting passageway to living and working areas of the space station. Unity has two attached pressurized mating adapters (PMAs) and one stowage rack installed inside. PMA-1 provides the permanent connection point between Unity and Zarya; PMA-2 will serve as a Space Shuttle docking port. Zarya is a self-supporting active vehicle, providing propulsive control capability and power during the early assembly stages. It also has fuel storage capability
NASA Astrophysics Data System (ADS)
Tufts, Joseph R.; Lobdill, Rich; Haldeman, Benjamin J.; Haynes, Rachel; Hawkins, Eric; Burleson, Ben; Jahng, David
2008-07-01
The Las Cumbres Observatory Global Telescope Network (LCOGT) is an ambitious project to build and operate, within 5 years, a worldwide robotic network of 50 0.4, 1, and 2 m telescopes sharing identical instrumentation and optimized for precision photometry of time-varying sources. The telescopes, instrumentation, and software are all developed in house with two 2 m telescopes already installed. The LCOGT Imaging Lab is responsible for assembly and characterization of the network's cameras and instrumentation. In addition to a fully equipped CNC machine shop, two electronics labs, and a future optics lab, the Imaging Lab is designed from the ground up to be a superb environment for bare detectors, precision filters, and assembled instruments. At the heart of the lab is an ISO class 5 cleanroom with full ionization. Surrounding this, the class 7 main lab houses equipment for detector characterization including QE and CTE, and equipment for measuring transmission and reflection of optics. Although the first science cameras installed, two TEC cooled e2v 42-40 deep depletion based units and two CryoTiger cooled Fairchild Imaging CCD486-BI based units, are from outside manufacturers, their 18 position filter wheels and the remainder of the network's science cameras, controllers, and instrumentation will be built in house. Currently being designed, the first generation LCOGT cameras for the network's 1 m telescopes use existing CCD486-BI devices and an in-house controller. Additionally, the controller uses digital signal processing to optimize readout noise vs. speed, and all instrumentation uses embedded microprocessors for communication over ethernet.
Dismantling of Loop-Type Channel Equipment of MR Reactor in NRC 'Kurchatov Institute' - 13040
DOE Office of Scientific and Technical Information (OSTI.GOV)
Volkov, Victor; Danilovich, Alexey; Zverkov, Yuri
2013-07-01
In 2009 the project of decommissioning of MR and RTF reactors was developed and approved by the Expert Authority of the Russian Federation (Gosexpertiza). The main objective of the decommissioning works identified in this project: - complete dismantling of reactor equipment and systems; - decontamination of reactor premises and site in accordance with the established sanitary and hygienic standards. At the preparatory stage (2008-2010) of the project the following works were executed: loop-type channels' dismantling in the storage pool; experimental fuel assemblies' removal from spent fuel repositories in the central hall; spent fuel assembly removal from the liquid-metal-cooled loop-type channelmore » of the reactor core and its placement into the SNF repository; and reconstruction of engineering support systems to the extent necessary for reactor decommissioning. The project assumes three main phases of dismantling and decontamination: - dismantling of equipment/pipelines of cooling circuits and loop-type channels, and auxiliary reactor equipment (2011-2012); - dismantling of equipment in underground reactor premises and of both MR and RTF in-vessel devices (2013-2014); - decontamination of reactor premises; rehabilitation of the reactor site; final radiation survey of reactor premises, loop-type channels and site; and issuance of the regulatory authorities' de-registration statement (2015). In 2011 the decommissioning license for the two reactors was received and direct MR decommissioning activities started. MR primary pipelines and loop-type facilities situated in the underground reactor hall were dismantled. Works were also launched to dismantle the loop-type channels' equipment in underground reactor premises; reactor buildings were reconstructed to allow removal of dismantled equipment; and the MR/RTF decommissioning sequence was identified. In autumn 2011 - spring 2012 results of dismantling activities performed are: - equipment from underground rooms (No. 66, 66A, 66B, 72, 64, 63) - as well as from water and gas loop corridors - was dismantled, with the total radwaste weight of 53 tons and the total removed activity of 5,0 x 10{sup 10} Bq; - loop-type channel equipment from underground reactor hall premises was dismantled; - 93 loop-type channels were characterized, chopped and removed, with radwaste of 2.6 x 10{sup 13} Bq ({sup 60}Co) and 1.5 x 10{sup 13} Bq ({sup 137}Cs) total activity removed from the reactor pool, fragmented and packaged. Some of this waste was placed into the high-level waste (HLW) repository of the Center. Dismantling works were executed with application of remotely operated mechanisms, which promoted decrease of radiation impact on the personnel. The average individual dose for the personnel was 1.9 mSv/year in 2011, and the collective dose is estimated as 0.0605 man x Sv/year. (authors)« less
Winter, Gabriele; Schaub, Karlheinz G; Großmann, Kay; Laun, Gerhard; Landau, Kurt; Bruder, Ralph
2012-01-01
Occupational hazards exist, if the design of the work situation is not in accordance with ergonomic design principles. At assembly lines ergonomics is applied to the design of work equipment and tasks and to work organisation. The ignoring of ergonomic principles in planning and design of assembly work leads to unfavourable working posture, action force and material handling. Disorders of the musculoskeletal system are of a common occurrence throughout Europe. Musculoskeletal disorders are a challenge against the background of disabled workers. The changes in a worker's capability have to be regarded in the conception of redesigned and new assembly lines. In this way ergonomics becomes progressively more important in planning and design of vehicles: The objective of ergonomic design in different stages of the vehicles development process is to achieve an optimal adaptation of the assembly work to workers. Hence the ergonomic screening tool "Design Check" (DC) was developed to identify ergonomic deficits in workplace layouts. The screening-tool is based on the current ergonomic state of the art in the design of physical work and relevant EU legal requirements. It was tested within a federal German research project at selected work stations at the assembly lines at Dr.-Ing. h.c. F. Porsche AG / Stuttgart. Meanwhile the application of the screening-tool DC is transferred in other parts of the Porsche AG, Stuttgart. It is also realized as an ergonomic standard method to perform assembly work in different phases of the vehicle development process.
Laser-assisted advanced assembly for MEMS fabrication
NASA Astrophysics Data System (ADS)
Atanasov, Yuriy Andreev
Micro Electro-Mechanical Systems (MEMS) are currently fabricated using methods originally designed for manufacturing semiconductor devices, using minimum if any assembly at all. The inherited limitations of this approach narrow the materials that can be employed and reduce the design complexity, imposing limitations on MEMS functionality. The proposed Laser-Assisted Advanced Assembly (LA3) method solves these problems by first fabricating components followed by assembly of a MEMS device. Components are micro-machined using a laser or by photolithography followed by wet/dry etching out of any material available in a thin sheet form. A wide range of materials can be utilized, including biocompatible metals, ceramics, polymers, composites, semiconductors, and materials with special properties such as memory shape alloys, thermoelectric, ferromagnetic, piezoelectric, and more. The approach proposed allows enhancing the structural and mechanical properties of the starting materials through heat treatment, tribological coatings, surface modifications, bio-functionalization, and more, a limited, even unavailable possibility with existing methods. Components are transferred to the substrate for assembly using the thermo-mechanical Selective Laser Assisted Die Transfer (tmSLADT) mechanism for microchips assembly, already demonstrated by our team. Therefore, the mechanical and electronic part of the MEMS can be fabricated using the same equipment/method. The viability of the Laser-Assisted Advanced Assembly technique for MEMS is demonstrated by fabricating magnetic switches for embedding in a conductive carbon-fiber metamaterial for use in an Electromagnetic-Responsive Mobile Cyber-Physical System (E-RMCPS), which is expected to improve the wireless communication system efficiency within a battery-powered device.