Backward assembly planning with DFA analysis
NASA Technical Reports Server (NTRS)
Lee, Sukhan (Inventor)
1992-01-01
An assembly planning system that operates based on a recursive decomposition of assembly into subassemblies is presented. The planning system analyzes assembly cost in terms of stability, directionality, and manipulability to guide the generation of preferred assembly plans. The planning in this system incorporates the special processes, such as cleaning, testing, labeling, etc., that must occur during the assembly. Additionally, the planning handles nonreversible, as well as reversible, assembly tasks through backward assembly planning. In order to decrease the planning efficiency, the system avoids the analysis of decompositions that do not correspond to feasible assembly tasks. This is achieved by grouping and merging those parts that can not be decomposable at the current stage of backward assembly planning due to the requirement of special processes and the constraint of interconnection feasibility. The invention includes methods of evaluating assembly cost in terms of the number of fixtures (or holding devices) and reorientations required for assembly, through the analysis of stability, directionality, and manipulability. All these factors are used in defining cost and heuristic functions for an AO* search for an optimal plan.
Backward assembly planning with DFA analysis
NASA Technical Reports Server (NTRS)
Lee, Sukhan (Inventor)
1995-01-01
An assembly planning system that operates based on a recursive decomposition of assembly into subassemblies, and analyzes assembly cost in terms of stability, directionality, and manipulability to guide the generation of preferred assembly plans is presented. The planning in this system incorporates the special processes, such as cleaning, testing, labeling, etc. that must occur during the assembly, and handles nonreversible as well as reversible assembly tasks through backward assembly planning. In order to increase the planning efficiency, the system avoids the analysis of decompositions that do not correspond to feasible assembly tasks. This is achieved by grouping and merging those parts that can not be decomposable at the current stage of backward assembly planning due to the requirement of special processes and the constraint of interconnection feasibility. The invention includes methods of evaluating assembly cost in terms of the number of fixtures (or holding devices) and reorientations required for assembly, through the analysis of stability, directionality, and manipulability. All these factors are used in defining cost and heuristic functions for an AO* search for an optimal plan.
Task planning and control synthesis for robotic manipulation in space applications
NASA Technical Reports Server (NTRS)
Sanderson, A. C.; Peshkin, M. A.; Homem-De-mello, L. S.
1987-01-01
Space-based robotic systems for diagnosis, repair and assembly of systems will require new techniques of planning and manipulation to accomplish these complex tasks. Results of work in assembly task representation, discrete task planning, and control synthesis which provide a design environment for flexible assembly systems in manufacturing applications, and which extend to planning of manipulatiuon operations in unstructured environments are summarized. Assembly planning is carried out using the AND/OR graph representation which encompasses all possible partial orders of operations and may be used to plan assembly sequences. Discrete task planning uses the configuration map which facilitates search over a space of discrete operations parameters in sequential operations in order to achieve required goals in the space of bounded configuration sets.
Inventorying national forest resources...for planning-programing-budgeting system
Miles R. Hill; Elliot L. Amidon
1968-01-01
New systems for analyzing resource management problems, such as Planning-Programing-Budgeting, will require automated procedures to collect and assemble resource inventory data. A computer - oriented system called Map Information Assembly and Display System developed for this purpose was tested on a National Forest in California. It provided information on eight forest...
Innovative applications of artificial intelligence
NASA Astrophysics Data System (ADS)
Schorr, Herbert; Rappaport, Alain
Papers concerning applications of artificial intelligence are presented, covering applications in aerospace technology, banking and finance, biotechnology, emergency services, law, media planning, music, the military, operations management, personnel management, retail packaging, and manufacturing assembly and design. Specific topics include Space Shuttle telemetry monitoring, an intelligent training system for Space Shuttle flight controllers, an expert system for the diagnostics of manufacturing equipment, a logistics management system, a cooling systems design assistant, and a knowledge-based integrated circuit design critic. Additional topics include a hydraulic circuit design assistant, the use of a connector assembly specification expert system to harness detailed assembly process knowledge, a mixed initiative approach to airlift planning, naval battle management decision aids, an inventory simulation tool, a peptide synthesis expert system, and a system for planning the discharging and loading of container ships.
Semi-Immersive Virtual Turbine Engine Simulation System
NASA Astrophysics Data System (ADS)
Abidi, Mustufa H.; Al-Ahmari, Abdulrahman M.; Ahmad, Ali; Darmoul, Saber; Ameen, Wadea
2018-05-01
The design and verification of assembly operations is essential for planning product production operations. Recently, virtual prototyping has witnessed tremendous progress, and has reached a stage where current environments enable rich and multi-modal interaction between designers and models through stereoscopic visuals, surround sound, and haptic feedback. The benefits of building and using Virtual Reality (VR) models in assembly process verification are discussed in this paper. In this paper, we present the virtual assembly (VA) of an aircraft turbine engine. The assembly parts and sequences are explained using a virtual reality design system. The system enables stereoscopic visuals, surround sounds, and ample and intuitive interaction with developed models. A special software architecture is suggested to describe the assembly parts and assembly sequence in VR. A collision detection mechanism is employed that provides visual feedback to check the interference between components. The system is tested for virtual prototype and assembly sequencing of a turbine engine. We show that the developed system is comprehensive in terms of VR feedback mechanisms, which include visual, auditory, tactile, as well as force feedback. The system is shown to be effective and efficient for validating the design of assembly, part design, and operations planning.
Space Assembly, Maintenance and Servicing Study. Volume 4: Concept Development Plan.
1986-01-01
development of the concept development program (COP) plan: 1) Develop the CDP candidate work sheets 2) Categorize by application 3) Prioritize by... categorized under the ORU change-out section of this report, the large system assembly area will attempt to cover the EVA aspects of SAMS not discussed...space assemblies involve the evolvement of technologies related to multilevel orbital operating platforms on which both individual and cooperative
ERIC Educational Resources Information Center
Hunt, Lester W.; Burr, Donald F.
The Simu-School Program and the National Center for Educational Planning were conceived because of the need for (1) expertise in educational planning, (2) a system to collect and assemble the vast amount of knowledge concerning education, (3) community involvement in planning, and (4) a system to accurately interpret today's data in planning for…
NASA Technical Reports Server (NTRS)
Rodriguez, Guillermo (Editor)
1990-01-01
Various papers on intelligent control and adaptive systems are presented. Individual topics addressed include: control architecture for a Mars walking vehicle, representation for error detection and recovery in robot task plans, real-time operating system for robots, execution monitoring of a mobile robot system, statistical mechanics models for motion and force planning, global kinematics for manipulator planning and control, exploration of unknown mechanical assemblies through manipulation, low-level representations for robot vision, harmonic functions for robot path construction, simulation of dual behavior of an autonomous system. Also discussed are: control framework for hand-arm coordination, neural network approach to multivehicle navigation, electronic neural networks for global optimization, neural network for L1 norm linear regression, planning for assembly with robot hands, neural networks in dynamical systems, control design with iterative learning, improved fuzzy process control of spacecraft autonomous rendezvous using a genetic algorithm.
Discrete State Change Model of Manufacturing Quality to Aid Assembly Process Design
NASA Astrophysics Data System (ADS)
Koga, Tsuyoshi; Aoyama, Kazuhiro
This paper proposes a representation model of the quality state change in an assembly process that can be used in a computer-aided process design system. In order to formalize the state change of the manufacturing quality in the assembly process, the functions, operations, and quality changes in the assembly process are represented as a network model that can simulate discrete events. This paper also develops a design method for the assembly process. The design method calculates the space of quality state change and outputs a better assembly process (better operations and better sequences) that can be used to obtain the intended quality state of the final product. A computational redesigning algorithm of the assembly process that considers the manufacturing quality is developed. The proposed method can be used to design an improved manufacturing process by simulating the quality state change. A prototype system for planning an assembly process is implemented and applied to the design of an auto-breaker assembly process. The result of the design example indicates that the proposed assembly process planning method outputs a better manufacturing scenario based on the simulation of the quality state change.
Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration
NASA Technical Reports Server (NTRS)
Greene, William D.
2013-01-01
System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.
Manager's assistant systems for space system planning
NASA Technical Reports Server (NTRS)
Bewley, William L.; Burnard, Robert; Edwards, Gary E.; Shoop, James
1992-01-01
This paper describes a class of knowledge-based 'assistant' systems for space system planning. Derived from technology produced for the DARPA/USAF Pilot's Associate program, these assistant systems help the human planner by doing the bookkeeping to maintain plan data and executing the procedures and heuristics currently used by the human planner to define, assess, diagnose, and revise plans. Intelligent systems for Space Station Freedom assembly sequence planning and Advanced Launch System modeling will be presented as examples. Ongoing NASA-funded work on a framework supporting the development of such tools will also be described.
Autonomous Mechanical Assembly on the Space Shuttle: An Overview
NASA Technical Reports Server (NTRS)
Raibert, M. H.
1979-01-01
The space shuttle will be equipped with a pair of 50 ft. manipulators used to handle payloads and to perform mechanical assembly operations. Although current plans call for these manipulators to be operated by a human teleoperator. The possibility of using results from robotics and machine intelligence to automate this shuttle assembly system was investigated. The major components of an autonomous mechanical assembly system are examined, along with the technology base upon which they depend. The state of the art in advanced automation is also assessed.
NASA Astrophysics Data System (ADS)
Pries, V. V.; Proskuriakov, N. E.
2018-04-01
To control the assembly quality of multi-element mass-produced products on automatic rotor lines, control methods with operational feedback are required. However, due to possible failures in the operation of the devices and systems of automatic rotor line, there is always a real probability of getting defective (incomplete) products into the output process stream. Therefore, a continuous sampling control of the products completeness, based on the use of statistical methods, remains an important element in managing the quality of assembly of multi-element mass products on automatic rotor lines. The feature of continuous sampling control of the multi-element products completeness in the assembly process is its breaking sort, which excludes the possibility of returning component parts after sampling control to the process stream and leads to a decrease in the actual productivity of the assembly equipment. Therefore, the use of statistical procedures for continuous sampling control of the multi-element products completeness when assembled on automatic rotor lines requires the use of such sampling plans that ensure a minimum size of control samples. Comparison of the values of the limit of the average output defect level for the continuous sampling plan (CSP) and for the automated continuous sampling plan (ACSP) shows the possibility of providing lower limit values for the average output defects level using the ACSP-1. Also, the average sample size when using the ACSP-1 plan is less than when using the CSP-1 plan. Thus, the application of statistical methods in the assembly quality management of multi-element products on automatic rotor lines, involving the use of proposed plans and methods for continuous selective control, will allow to automating sampling control procedures and the required level of quality of assembled products while minimizing sample size.
Food System Trade Study for a Near-Term Mars Mission
NASA Technical Reports Server (NTRS)
Levri, Julie; Luna, Bernadette (Technical Monitor)
2000-01-01
This paper evaluates several food system options for a near-term Mars mission, based on plans for the 120-day BIO-Plex test. Food systems considered in the study are based on the International Space Station (ISS) Assembly Phase and Assembly Complete food systems. The four systems considered are: 1) ISS assembly phase food system (US portion) with individual packaging without salad production; 2) ISS assembly phase food system (US portion) with individual packaging, with salad production; 3) ISS assembly phase food system (US portion) with bulk packaging, with salad production; 4) ISS assembly complete food system (US portion) with bulk packaging with salad and refrigeration/freezing. The food system options are assessed using equivalent system mass (ESM), which evaluates each option based upon the mass, volume, power, cooling and crewtime requirements that are associated with each food system option. However, since ESM is unable to elucidate the differences in psychological benefits between the food systems, a qualitative evaluation of each option is also presented.
Robotic Assembly of Truss Structures for Space Systems and Future Research Plans
NASA Technical Reports Server (NTRS)
Doggett, William
2002-01-01
Many initiatives under study by both the space science and earth science communities require large space systems, i.e. with apertures greater than 15 m or dimensions greater than 20 m. This paper reviews the effort in NASA Langley Research Center's Automated Structural Assembly Laboratory which laid the foundations for robotic construction of these systems. In the Automated Structural Assembly Laboratory reliable autonomous assembly and disassembly of an 8 meter planar structure composed of 102 truss elements covered by 12 panels was demonstrated. The paper reviews the hardware and software design philosophy which led to reliable operation during weeks of near continuous testing. Special attention is given to highlight the features enhancing assembly reliability.
NASA Technical Reports Server (NTRS)
1979-01-01
A plan for the production of two PEP flight systems is defined. The task's milestones are described. Provisions for the development and assembly of new ground support equipment required for both testing and launch operations are included.
America's Next Great Ship: Space Launch System Core Stage Transitioning from Design to Manufacturing
NASA Technical Reports Server (NTRS)
Birkenstock, Benjamin; Kauer, Roy
2014-01-01
The Space Launch System (SLS) Program is essential to achieving the Nation's and NASA's goal of human exploration and scientific investigation of the solar system. As a multi-element program with emphasis on safety, affordability, and sustainability, SLS is becoming America's next great ship of exploration. The SLS Core Stage includes avionics, main propulsion system, pressure vessels, thrust vector control, and structures. Boeing manufactures and assembles the SLS core stage at the Michoud Assembly Facility (MAF) in New Orleans, LA, a historical production center for Saturn V and Space Shuttle programs. As the transition from design to manufacturing progresses, the importance of a well-executed manufacturing, assembly, and operation (MA&O) plan is crucial to meeting performance objectives. Boeing employs classic techniques such as critical path analysis and facility requirements definition as well as innovative approaches such as Constraint Based Scheduling (CBS) and Cirtical Chain Project Management (CCPM) theory to provide a comprehensive suite of project management tools to manage the health of the baseline plan on both a macro (overall project) and micro level (factory areas). These tools coordinate data from multiple business systems and provide a robust network to support Material & Capacity Requirements Planning (MRP/CRP) and priorities. Coupled with these tools and a highly skilled workforce, Boeing is orchestrating the parallel buildup of five major sub assemblies throughout the factory. Boeing and NASA are transforming MAF to host state of the art processes, equipment and tooling, the most prominent of which is the Vertical Assembly Center (VAC), the largest weld tool in the world. In concert, a global supply chain is delivering a range of structural elements and component parts necessary to enable an on-time delivery of the integrated Core Stage. SLS is on plan to launch humanity into the next phase of space exploration.
An expert system executive for automated assembly of large space truss structures
NASA Technical Reports Server (NTRS)
Allen, Cheryl L.
1993-01-01
Langley Research Center developed a unique test bed for investigating the practical problems associated with the assembly of large space truss structures using robotic manipulators. The test bed is the result of an interdisciplinary effort that encompasses the full spectrum of assembly problems - from the design of mechanisms to the development of software. The automated structures assembly test bed and its operation are described, the expert system executive and its development are detailed, and the planned system evolution is discussed. Emphasis is on the expert system implementation of the program executive. The executive program must direct and reliably perform complex assembly tasks with the flexibility to recover from realistic system errors. The employment of an expert system permits information that pertains to the operation of the system to be encapsulated concisely within a knowledge base. This consolidation substantially reduced code, increased flexibility, eased software upgrades, and realized a savings in software maintenance costs.
NASA Technical Reports Server (NTRS)
1975-01-01
Mission planning, systems analysis, and design concepts for the Space Shuttle/Spacelab system for extended manned operations are described. Topics discussed are: (1) payloads, (2) spacecraft docking, (3) structural design criteria, (4) life support systems, (5) power supplies, and (6) the role of man in long duration orbital operations. Also discussed are the assembling of large structures in space. Engineering drawings are included.
Assembly planning based on subassembly extraction
NASA Technical Reports Server (NTRS)
Lee, Sukhan; Shin, Yeong Gil
1990-01-01
A method is presented for the automatic determination of assembly partial orders from a liaison graph representation of an assembly through the extraction of preferred subassemblies. In particular, the authors show how to select a set of tentative subassemblies by decomposing a liaison graph into a set of subgraphs based on feasibility and difficulty of disassembly, how to evaluate each of the tentative subassemblies in terms of assembly cost using the subassembly selection indices, and how to construct a hierarchical partial order graph (HPOG) as an assembly plan. The method provides an approach to assembly planning by identifying spatial parallelism in assembly as a means of constructing temporal relationships among assembly operations and solves the problem of finding a cost-effective assembly plan in a flexible environment. A case study of the assembly planning of a mechanical assembly is presented.
NASA Technical Reports Server (NTRS)
Homem De Mello, Luiz S.; Sanderson, Arthur C.
1991-01-01
The authors introduce two criteria for the evaluation and selection of assembly plans. The first criterion is to maximize the number of different sequences in which the assembly tasks can be executed. The second criterion is to minimize the total assembly time through simultaneous execution of assembly tasks. An algorithm that performs a heuristic search for the best assembly plan over the AND/OR graph representation of assembly plans is discussed. Admissible heuristics for each of the two criteria introduced are presented. Some implementation issues that affect the computational efficiency are addressed.
NASA Technical Reports Server (NTRS)
Schunk, R. Gregory
2002-01-01
This paper presents the Modeling and Analysis of the Space Station Environment Control and Life Support System Pressure Control Pump Assembly (PCPA). The contents include: 1) Integrated PCPA/Manifold Analyses; 2) Manifold Performance Analysis; 3) PCPA Motor Heat Leak Study; and 4) Future Plans. This paper is presented in viewgraph form.
North Carolina's Basic Education Plan and the Arts.
ERIC Educational Resources Information Center
Page, Frances M.; Dyke, Lane
1990-01-01
Discusses the changes made by the North Carolina General Assembly in the state school system with the Basic Education Plan (BEP). The plan focuses on curriculum, class size, spiral curriculum, and competency examinations. Reports that the BEP views the arts as basic to education. (GG)
Ground controlled robotic assembly operations for Space Station Freedom
NASA Technical Reports Server (NTRS)
Parrish, Joseph C.
1991-01-01
A number of dextrous robotic systems and associated positioning and transportation devices are available on Space Station Freedom (SSF) to perform assembly tasks that would otherwise need to be performed by extravehicular activity (EVA) crewmembers. The currently planned operating mode for these robotic systems during the assembly phase is teleoperation by intravehicular activity (IVA) crewmembers. While this operating mode is less hazardous and expensive than manned EVA operations, and has insignificant control loop time delays, the amount of IVA time available to support telerobotic operations is much less than the anticipated requirements. Some alternative is needed to allow the robotic systems to perform useful tasks without exhausting the available IVA resources; ground control is one such alternative. The issues associated with ground control of SSF robotic systems to alleviate onboard crew time availability constraints are investigated. Key technical issues include the effect of communication time delays, the need for safe, reliable execution of remote operations, and required modifications to the SSF ground and flight system architecture. Time delay compensation techniques such as predictive displays and world model-based force reflection are addressed and collision detection and avoidance strategies to ensure the safety of the on-orbit crew, Orbiter, and SSF are described. Although more time consuming and difficult than IVA controlled teleoperations or manned EVA, ground controlled telerobotic operations offer significant benefits during the SSF assembly phase, and should be considered in assembly planning activities.
ERIC Educational Resources Information Center
Western Interstate Commission for Higher Education, Boulder, CO. National Center for Higher Education Management Systems.
The 1977 National Assembly of the National Center for Higher Education Management Systems addressed specific aspects of excellence, diversity, and access to postsecondary education and suggested ways to preserve these values in planning, managing, and financing in the 1980's. The following conference papers are presented: "Placing Value…
A rigid and thermally stable all ceramic optical support bench assembly for the LSST Camera
NASA Astrophysics Data System (ADS)
Kroedel, Matthias; Langton, J. Brian; Wahl, Bill
2017-09-01
This paper will present the ceramic design, fabrication and metrology results and assembly plan of the LSST camera optical bench structure which is using the unique manufacturing features of the HB-Cesic technology. The optical bench assembly consists of a rigid "Grid" fabrication supporting individual raft plates mounting sensor assemblies by way of a rigid kinematic support system to meet extreme stringent requirements for focal plane planarity and stability.
Minimal-effort planning of active alignment processes for beam-shaping optics
NASA Astrophysics Data System (ADS)
Haag, Sebastian; Schranner, Matthias; Müller, Tobias; Zontar, Daniel; Schlette, Christian; Losch, Daniel; Brecher, Christian; Roßmann, Jürgen
2015-03-01
In science and industry, the alignment of beam-shaping optics is usually a manual procedure. Many industrial applications utilizing beam-shaping optical systems require more scalable production solutions and therefore effort has been invested in research regarding the automation of optics assembly. In previous works, the authors and other researchers have proven the feasibility of automated alignment of beam-shaping optics such as collimation lenses or homogenization optics. Nevertheless, the planning efforts as well as additional knowledge from the fields of automation and control required for such alignment processes are immense. This paper presents a novel approach of planning active alignment processes of beam-shaping optics with the focus of minimizing the planning efforts for active alignment. The approach utilizes optical simulation and the genetic programming paradigm from computer science for automatically extracting features from a simulated data basis with a high correlation coefficient regarding the individual degrees of freedom of alignment. The strategy is capable of finding active alignment strategies that can be executed by an automated assembly system. The paper presents a tool making the algorithm available to end-users and it discusses the results of planning the active alignment of the well-known assembly of a fast-axis collimator. The paper concludes with an outlook on the transferability to other use cases such as application specific intensity distributions which will benefit from reduced planning efforts.
Regenerative (Regen) ECLSS Operations Water Balance
NASA Technical Reports Server (NTRS)
Tobias, Barry
2010-01-01
In November 2008, the Water Regenerative System racks were launched aboard Space Shuttle flight, STS-126 (ULF2) and installed and activated on the International Space Station (ISS). These racks, consisting of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA), completed the installation of the Regenerative (Regen) ECLSS systems which includes the Oxygen Generator Assembly (OGA) that was launched 2 years prior. With the onset of active water management on the US segment of the ISS, a new operational concept was required, that of "water balance." Even more recently, in 2010 the Sabatier system came online which converts H2 and CO2 into water and methane. The Regen ECLSS systems accept condensation from the atmosphere, urine from crew, and processes that fluid via various means into potable water which is used for crew drinking, building up skip-cycle water inventory, and water for electrolysis to produce oxygen. Specification rates of crew urine output, condensate output, O2 requirements, toilet flush water and drinking needs are well documented and used as a general plan when Regen ECLSS came online. Spec rates are useful in long term planning, however, daily or weekly rates are dependent on a number of variables. The constantly changing rates created a new challenge for the ECLSS flight controllers, who are responsible for operating the ECLSS systems onboard ISS. This paper will review the various inputs to rate changes and inputs to planning events, including but not limited to; crew personnel makeup, Regen ECLSS system operability, vehicle traffic, water containment availability, and Carbon Dioxide Removal Assembly (CDRA) capability. Along with the inputs that change the various rates, the paper will review the different systems, their constraints and finally the operational means by which flight controllers manage this new challenge of "water balance."
Wang, Huan; Dong, Peng; Liu, Hongcheng; Xing, Lei
2017-02-01
Current treatment planning remains a costly and labor intensive procedure and requires multiple trial-and-error adjustments of system parameters such as the weighting factors and prescriptions. The purpose of this work is to develop an autonomous treatment planning strategy with effective use of prior knowledge and in a clinically realistic treatment planning platform to facilitate radiation therapy workflow. Our technique consists of three major components: (i) a clinical treatment planning system (TPS); (ii) a formulation of decision-function constructed using an assemble of prior treatment plans; (iii) a plan evaluator or decision-function and an outer-loop optimization independent of the clinical TPS to assess the TPS-generated plan and to drive the search toward a solution optimizing the decision-function. Microsoft (MS) Visual Studio Coded UI is applied to record some common planner-TPS interactions as subroutines for querying and interacting with the TPS. These subroutines are called back in the outer-loop optimization program to navigate the plan selection process through the solution space iteratively. The utility of the approach is demonstrated by using clinical prostate and head-and-neck cases. An autonomous treatment planning technique with effective use of an assemble of prior treatment plans is developed to automatically maneuver the clinical treatment planning process in the platform of a commercial TPS. The process mimics the decision-making process of a human planner and provides a clinically sensible treatment plan automatically, thus reducing/eliminating the tedious manual trial-and-errors of treatment planning. It is found that the prostate and head-and-neck treatment plans generated using the approach compare favorably with that used for the patients' actual treatments. Clinical inverse treatment planning process can be automated effectively with the guidance of an assemble of prior treatment plans. The approach has the potential to significantly improve the radiation therapy workflow. © 2016 American Association of Physicists in Medicine.
A strategy planner for NASA robotics applications
NASA Technical Reports Server (NTRS)
Brodd, S. S.
1985-01-01
Automatic strategy or task planning is an important element of robotics systems. A strategy planner under development at Goddard Space Flight Center automatically produces robot plans for assembly, disassembly, or repair of NASA spacecraft from computer aided design descriptions of the individual parts of the spacecraft.
NASA Technical Reports Server (NTRS)
Morris, Aaron L.; Olson, Leah M.
2011-01-01
The Crew Exploration Vehicle Parachute Assembly System (CPAS) is engaged in a multi-year design and test campaign aimed at qualifying a parachute recovery system for human use on the Orion Spacecraft. Orion has parachute flight performance requirements that will ultimately be verified through the use of Monte Carlo multi-degree of freedom flight simulations. These simulations will be anchored by real world flight test data and iteratively improved to provide a closer approximation to the real physics observed in the inherently chaotic inflation and steady state flight of the CPAS parachutes. This paper will examine the processes necessary to verify the flight performance requirements of the human rated spacecraft. The focus will be on the requirements verification and model validation planned on CPAS.
NASA's SPICE System Models the Solar System
NASA Technical Reports Server (NTRS)
Acton, Charles
1996-01-01
SPICE is NASA's multimission, multidiscipline information system for assembling, distributing, archiving, and accessing space science geometry and related data used by scientists and engineers for mission design and mission evaluation, detailed observation planning, mission operations, and science data analysis.
Design of internal support structures for an inflatable lunar habitat
NASA Technical Reports Server (NTRS)
Cameron, Elizabeth A.; Duston, John A.; Lee, David D.
1990-01-01
NASA has a long range goal of constructing a fully equipped, manned lunar outpost on the near side of the moon by the year 2015. The proposed outpost includes an inflatable lunar habitat to support crews during missions longer that 12 months. A design for the internal support structures of the inflatable habitat is presented. The design solution includes material selection, substructure design, assembly plan development, and concept scale model construction. Alternate designs and design solutions for each component of the design are discussed. Alternate materials include aluminum, titanium, and reinforced polymers. Vertical support alternates include column systems, truss systems, suspension systems, and lunar lander supports. Horizontal alternates include beams, trusses, floor/truss systems, and expandable trusses. Feasibility studies on each alternate showed that truss systems and expandable trusses were the most feasible candidates for conceptual design. The team based the designs on the properties of 7075 T73 aluminum. The substructure assembly plan, minimizes assembly time and allows crews to construct the habitat without the use of EVA suits. In addition to the design solutions, the report gives conclusions and recommendations for further study of the inflatable habitat design.
A simulation facility for testing Space Station assembly procedures
NASA Technical Reports Server (NTRS)
Hajare, Ankur R.; Wick, Daniel T.; Shehad, Nagy M.
1994-01-01
NASA plans to construct the Space Station Freedom (SSF) in one of the most hazardous environments known to mankind - space. It is of the utmost importance that the procedures to assemble and operate the SSF in orbit are both safe and effective. This paper describes a facility designed to test the integration of the telerobotic systems and to test assembly procedures using a real-world robotic arm grappling space hardware in a simulated microgravity environment.
Progreso en la puesta en marcha del espectrógrafo BHROS
NASA Astrophysics Data System (ADS)
Díaz, R.; Levato, H.; Casagrande, A.; Piroddi, D.; Yornet, G.; Eikenberry, S.; Gonzalez, F.; Townsend, A.; Godoy, J.; Marun, A.; Gunella, F.; D'Ambra, A.; Warner, C.; Bosch, G.; Donoso, V.; Grosso, M.; Seifer, E.
2017-10-01
We report the advance on the re-assembly and commissioning of the BHROS spectrograph, its associated instrument laboratory and the planned system of telescopes. This is the largest astronomical spectrograph ever assembled in Argentina and the laboratory is also being used for other instrumentation needs of ICATE. We have installed a half meter telescope in order to test the spectrograph with on-sky sources, and we plan to install a network of telescopes feeding it via a multiple optical fiber system. In these first tests we have obtained spectra of the Sun (R100000) and Jupiter and Achernar (R40000). In 2017-2018 we plan to install and test a network of five small telescopes feeding the spectrograph with the collecting area equivalent to that of a one meter telescope, with a cost 10-25 times less in acquisition, transport, installation and operation respect to a conventional monolithic telescope.
An Efficient and Versatile Means for Assembling and Manufacturing Systems in Space
NASA Technical Reports Server (NTRS)
Dorsey, John T.; Doggett, William R.; Hafley, Robert A.; Komendera, Erik; Correll, Nikolaus; King, Bruce
2012-01-01
Within NASA Space Science, Exploration and the Office of Chief Technologist, there are Grand Challenges and advanced future exploration, science and commercial mission applications that could benefit significantly from large-span and large-area structural systems. Of particular and persistent interest to the Space Science community is the desire for large (in the 10- 50 meter range for main aperture diameter) space telescopes that would revolutionize space astronomy. Achieving these systems will likely require on-orbit assembly, but previous approaches for assembling large-scale telescope truss structures and systems in space have been perceived as very costly because they require high precision and custom components. These components rely on a large number of mechanical connections and supporting infrastructure that are unique to each application. In this paper, a new assembly paradigm that mitigates these concerns is proposed and described. A new assembly approach, developed to implement the paradigm, is developed incorporating: Intelligent Precision Jigging Robots, Electron-Beam welding, robotic handling/manipulation, operations assembly sequence and path planning, and low precision weldable structural elements. Key advantages of the new assembly paradigm, as well as concept descriptions and ongoing research and technology development efforts for each of the major elements are summarized.
A representation for error detection and recovery in robot task plans
NASA Technical Reports Server (NTRS)
Lyons, D. M.; Vijaykumar, R.; Venkataraman, S. T.
1990-01-01
A general definition is given of the problem of error detection and recovery in robot assembly systems, and a general representation is developed for dealing with the problem. This invariant representation involves a monitoring process which is concurrent, with one monitor per task plan. A plan hierarchy is discussed, showing how diagnosis and recovery can be handled using the representation.
International Space Station Water Balance Operations
NASA Technical Reports Server (NTRS)
Tobias, Barry; Garr, John D., II; Erne, Meghan
2011-01-01
In November 2008, the Water Regenerative System racks were launched aboard Space Shuttle flight, STS-126 (ULF2) and installed and activated on the International Space Station (ISS). These racks, consisting of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA), completed the installation of the Regenerative (Regen) Environmental Control and Life Support Systems (ECLSS), which includes the Oxygen Generation Assembly (OGA) that was launched 2 years prior. With the onset of active water management on the US segment of the ISS, a new operational concept was required, that of water balance . In November of 2010, the Sabatier system, which converts H2 and CO2 into water and methane, was brought on line. The Regen ECLSS systems accept condensation from the atmosphere, urine from crew, and processes that fluid via various means into potable water, which is used for crew drinking, building up skip-cycle water inventory, and water for electrolysis to produce oxygen. Specification (spec) rates of crew urine output, condensate output, O2 requirements, toilet flush water, and drinking needs are well documented and used as the best guess planning rates when Regen ECLSS came online. Spec rates are useful in long term planning, however, daily or weekly rates are dependent upon a number of variables. The constantly changing rates created a new challenge for the ECLSS flight controllers, who are responsible for operating the ECLSS systems onboard ISS from Mission Control in Houston. This paper reviews the various inputs to water planning, rate changes, and dynamic events, including but not limited to: crew personnel makeup, Regen ECLSS system operability, vehicle traffic, water storage availability, and Carbon Dioxide Removal Assembly (CDRA), Sabatier, and OGA capability. Along with the inputs that change the various rates, the paper will review the different systems, their constraints, and finally the operational challenges and means by which flight controllers manage this new concept of "water balance."
Knowledge-based decision support for Space Station assembly sequence planning
NASA Astrophysics Data System (ADS)
1991-04-01
A complete Personal Analysis Assistant (PAA) for Space Station Freedom (SSF) assembly sequence planning consists of three software components: the system infrastructure, intra-flight value added, and inter-flight value added. The system infrastructure is the substrate on which software elements providing inter-flight and intra-flight value-added functionality are built. It provides the capability for building representations of assembly sequence plans and specification of constraints and analysis options. Intra-flight value-added provides functionality that will, given the manifest for each flight, define cargo elements, place them in the National Space Transportation System (NSTS) cargo bay, compute performance measure values, and identify violated constraints. Inter-flight value-added provides functionality that will, given major milestone dates and capability requirements, determine the number and dates of required flights and develop a manifest for each flight. The current project is Phase 1 of a projected two phase program and delivers the system infrastructure. Intra- and inter-flight value-added were to be developed in Phase 2, which has not been funded. Based on experience derived from hundreds of projects conducted over the past seven years, ISX developed an Intelligent Systems Engineering (ISE) methodology that combines the methods of systems engineering and knowledge engineering to meet the special systems development requirements posed by intelligent systems, systems that blend artificial intelligence and other advanced technologies with more conventional computing technologies. The ISE methodology defines a phased program process that begins with an application assessment designed to provide a preliminary determination of the relative technical risks and payoffs associated with a potential application, and then moves through requirements analysis, system design, and development.
Knowledge-based decision support for Space Station assembly sequence planning
NASA Technical Reports Server (NTRS)
1991-01-01
A complete Personal Analysis Assistant (PAA) for Space Station Freedom (SSF) assembly sequence planning consists of three software components: the system infrastructure, intra-flight value added, and inter-flight value added. The system infrastructure is the substrate on which software elements providing inter-flight and intra-flight value-added functionality are built. It provides the capability for building representations of assembly sequence plans and specification of constraints and analysis options. Intra-flight value-added provides functionality that will, given the manifest for each flight, define cargo elements, place them in the National Space Transportation System (NSTS) cargo bay, compute performance measure values, and identify violated constraints. Inter-flight value-added provides functionality that will, given major milestone dates and capability requirements, determine the number and dates of required flights and develop a manifest for each flight. The current project is Phase 1 of a projected two phase program and delivers the system infrastructure. Intra- and inter-flight value-added were to be developed in Phase 2, which has not been funded. Based on experience derived from hundreds of projects conducted over the past seven years, ISX developed an Intelligent Systems Engineering (ISE) methodology that combines the methods of systems engineering and knowledge engineering to meet the special systems development requirements posed by intelligent systems, systems that blend artificial intelligence and other advanced technologies with more conventional computing technologies. The ISE methodology defines a phased program process that begins with an application assessment designed to provide a preliminary determination of the relative technical risks and payoffs associated with a potential application, and then moves through requirements analysis, system design, and development.
Structural dynamics and control of large space structures. [conference
NASA Technical Reports Server (NTRS)
Lightner, E. B. (Compiler)
1981-01-01
The focus of the workshop was the basic research program assembled by LaRC to address the fundamental technology deficiencies that were identified in several studies on large space systems (LSS) conducted by NASA in the last several years. The staffs of the respective participants were assembled at the workshop to review the current state of research in the control technology for large structural systems and to plan the efforts that would be pursued by their respective organizations.
29. PLAN OF THE ARVFS FIELD TEST FACILITY SHOWING BUNKER, ...
29. PLAN OF THE ARVFS FIELD TEST FACILITY SHOWING BUNKER, CABLE CHASE, SHIELDING TANK AND FRAME ASSEMBLY. F.C. TORKELSON DRAWING NUMBER 842-ARVFS-701-1. INEL INDEX CODE NUMBER: 075 0701 851 151970. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tanny, S; Bogue, J; Parsai, E
Purpose: Potential collisions between the gantry head and the patient or table assembly are difficult to detect in most treatment planning systems. We have developed and implemented a novel software package for the representation of potential gantry collisions with the couch assembly at the time of treatment planning. Methods: Physical dimensions of the Varian Edge linear accelerator treatment head were measured and reproduced using the Visual Python display package. A script was developed for the Pinnacle treatment planning system to generate a file with the relevant couch, gantry, and isocenter positions for each beam in a planning trial. A pythonmore » program was developed to parse the information from the TPS and produce a representative model of the couch/gantry system. Using the model and the Visual Python libraries, a rendering window is generated for each beam that allows the planner to evaluate the possibility of a collision. Results: Comparison against heuristic methods and direct verification on the machine validated the collision model generated by the software. Encounters of <1 cm between the gantry treatment head and table were visualized as collisions in our virtual model. Visual windows were created depicting the angle of collision for each beam, including the anticipated table coordinates. Visual rendering of a 6 arc trial with multiple couch positions was completed in under 1 minute, with network bandwidth being the primary bottleneck. Conclusion: The developed software allows for quick examination of possible collisions during the treatment planning process and helps to prevent major collisions prior to plan approval. The software can easily be implemented on future planning systems due to the versatility and platform independence of the Python programming language. Further integration of the software with the treatment planning system will allow the possibility of patient-gantry collision detection for a range of treatment machines.« less
PlanMine--a mineable resource of planarian biology and biodiversity.
Brandl, Holger; Moon, HongKee; Vila-Farré, Miquel; Liu, Shang-Yun; Henry, Ian; Rink, Jochen C
2016-01-04
Planarian flatworms are in the midst of a renaissance as a model system for regeneration and stem cells. Besides two well-studied model species, hundreds of species exist worldwide that present a fascinating diversity of regenerative abilities, tissue turnover rates, reproductive strategies and other life history traits. PlanMine (http://planmine.mpi-cbg.de/) aims to accomplish two primary missions: First, to provide an easily accessible platform for sharing, comparing and value-added mining of planarian sequence data. Second, to catalyze the comparative analysis of the phenotypic diversity amongst planarian species. Currently, PlanMine houses transcriptomes independently assembled by our lab and community contributors. Detailed assembly/annotation statistics, a custom-developed BLAST viewer and easy export options enable comparisons at the contig and assembly level. Consistent annotation of all transcriptomes by an automated pipeline, the integration of published gene expression information and inter-relational query tools provide opportunities for mining planarian gene sequences and functions. For inter-species comparisons, we include transcriptomes of, so far, six planarian species, along with images, expert-curated information on their biology and pre-calculated cross-species sequence homologies. PlanMine is based on the popular InterMine system in order to make the rich biology of planarians accessible to the general life sciences research community. © The Author(s) 2015. Published by Oxford University Press on behalf of Nucleic Acids Research.
NASA Astrophysics Data System (ADS)
Rembala, Richard; Ower, Cameron
2009-10-01
MDA has provided 25 years of real-time engineering support to Shuttle (Canadarm) and ISS (Canadarm2) robotic operations beginning with the second shuttle flight STS-2 in 1981. In this capacity, our engineering support teams have become familiar with the evolution of mission planning and flight support practices for robotic assembly and support operations at mission control. This paper presents observations on existing practices and ideas to achieve reduced operational overhead to present programs. It also identifies areas where robotic assembly and maintenance of future space stations and space-based facilities could be accomplished more effectively and efficiently. Specifically, our experience shows that past and current space Shuttle and ISS assembly and maintenance operations have used the approach of extensive preflight mission planning and training to prepare the flight crews for the entire mission. This has been driven by the overall communication latency between the earth and remote location of the space station/vehicle as well as the lack of consistent robotic and interface standards. While the early Shuttle and ISS architectures included robotics, their eventual benefits on the overall assembly and maintenance operations could have been greater through incorporating them as a major design driver from the beginning of the system design. Lessons learned from the ISS highlight the potential benefits of real-time health monitoring systems, consistent standards for robotic interfaces and procedures and automated script-driven ground control in future space station assembly and logistics architectures. In addition, advances in computer vision systems and remote operation, supervised autonomous command and control systems offer the potential to adjust the balance between assembly and maintenance tasks performed using extra vehicular activity (EVA), extra vehicular robotics (EVR) and EVR controlled from the ground, offloading the EVA astronaut and even the robotic operator on-orbit of some of the more routine tasks. Overall these proposed approaches when used effectively offer the potential to drive down operations overhead and allow more efficient and productive robotic operations.
95. JOB NO. 1347F, SHEET 1, 1927/1931, PLOT PLAN, ASSEMBLY ...
95. JOB NO. 1347-F, SHEET 1, 1927/1931, PLOT PLAN, ASSEMBLY BUILDING FOR FORD MOTOR COMPANY, LONG BEACH, CALIFORNIA - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA
A computer-oriented system for assembling and displaying land management information
Elliot L. Amidon
1964-01-01
Maps contain information basic to land management planning. By transforming conventional map symbols into numbers which are punched into cards, the land manager can have a computer assemble and display information required for a specific job. He can let a computer select information from several maps, combine it with such nonmap data as treatment cost or benefit per...
AND/OR graph representation of assembly plans
NASA Astrophysics Data System (ADS)
Homem de Mello, Luiz S.; Sanderson, Arthur C.
1990-04-01
A compact representation of all possible assembly plans of a product using AND/OR graphs is presented as a basis for efficient planning algorithms that allow an intelligent robot to pick a course of action according to instantaneous conditions. The AND/OR graph is equivalent to a state transition graph but requires fewer nodes and simplifies the search for feasible plans. Three applications are discussed: (1) the preselection of the best assembly plan, (2) the recovery from execution errors, and (3) the opportunistic scheduling of tasks. An example of an assembly with four parts illustrates the use of the AND/OR graph representation in assembly-plan preselection, based on the weighting of operations according to complexity of manipulation and stability of subassemblies. A hypothetical error situation is discussed to show how a bottom-up search of the AND/OR graph leads to an efficient recovery.
AND/OR graph representation of assembly plans
NASA Technical Reports Server (NTRS)
Homem De Mello, Luiz S.; Sanderson, Arthur C.
1990-01-01
A compact representation of all possible assembly plans of a product using AND/OR graphs is presented as a basis for efficient planning algorithms that allow an intelligent robot to pick a course of action according to instantaneous conditions. The AND/OR graph is equivalent to a state transition graph but requires fewer nodes and simplifies the search for feasible plans. Three applications are discussed: (1) the preselection of the best assembly plan, (2) the recovery from execution errors, and (3) the opportunistic scheduling of tasks. An example of an assembly with four parts illustrates the use of the AND/OR graph representation in assembly-plan preselection, based on the weighting of operations according to complexity of manipulation and stability of subassemblies. A hypothetical error situation is discussed to show how a bottom-up search of the AND/OR graph leads to an efficient recovery.
Implementation of a Web-Based Collaborative Process Planning System
NASA Astrophysics Data System (ADS)
Wang, Huifen; Liu, Tingting; Qiao, Li; Huang, Shuangxi
Under the networked manufacturing environment, all phases of product manufacturing involving design, process planning, machining and assembling may be accomplished collaboratively by different enterprises, even different manufacturing stages of the same part may be finished collaboratively by different enterprises. Based on the self-developed networked manufacturing platform eCWS(e-Cooperative Work System), a multi-agent-based system framework for collaborative process planning is proposed. In accordance with requirements of collaborative process planning, share resources provided by cooperative enterprises in the course of collaboration are classified into seven classes. Then a reconfigurable and extendable resource object model is built. Decision-making strategy is also studied in this paper. Finally a collaborative process planning system e-CAPP is developed and applied. It provides strong support for distributed designers to collaboratively plan and optimize product process though network.
NASA Technical Reports Server (NTRS)
1995-01-01
The purpose of this contract was to provide optomechanical engineering and fabrication support to the Solar X-ray Imager (SXI) program in the areas of mirror, optical bench and camera assemblies of the telescope. The Center for Applied Optics (CAO) worked closely with the Optics and S&E technical staff of MSFC to develop and investigate the most viable and economical options for the design and fabrication of a number of parts for the various telescope assemblies. All the tasks under this delivery order have been successfully completed within budget and schedule. A number of development hardware parts have been designed and fabricated jointly by MSFC and UAH for the engineering model of SXI. The major parts include a nickel electroformed mirror and a mirror mount, plating and coating of the ceramic spacers, and gold plating of the contact rings and fingers for the camera assembly. An aluminum model of the high accuracy sun sensor (HASS) was also designed and fabricated. A number of fiber optic tapers for the camera assembly were also coated with indium tin oxide and phosphor for testing and evaluation by MSFC. A large number of the SXI optical bench parts were also redesigned and simplified for a prototype telescope. These parts include the forward and rear support flanges, front aperture plate, the graphite epoxy optical bench and a test fixture for the prototype telescope. More than fifty (50) drawings were generated for various components of the prototype telescope. Some of these parts were subsequently fabricated at UAH machine shop or at MSFC or by the outside contractors. UAH also provide technical support to MSFC staff for a number of preliminary and critical design reviews. These design reviews included PDR and CDR for the mirror assembly by United Technologies Optical Systems (UTOS), and the program quarterly reviews, and SXI PDR and CDR. UAH staff also regularly attended the monthly status reviews, and made a significant number of suggestions to improve the design, assembly and alignment of the telescope. Finally, a high level assembly and alignment plan for the entire telescope was prepared by UAH. This plan addresses the sequence of assembly, the required assembly and alignment tolerances, and the methods to verify the alignment at each step during the assembly process. This assembly and alignment plan will be used to assemble and integrate the engineering model (EM) of the telescope. Later on, based on this plan more detailed assembly and alignment procedures will be developed for the lower-level assemblies of SXI.
Electric power system test and verification program
NASA Technical Reports Server (NTRS)
Rylicki, Daniel S.; Robinson, Frank, Jr.
1994-01-01
Space Station Freedom's (SSF's) electric power system (EPS) hardware and software verification is performed at all levels of integration, from components to assembly and system level tests. Careful planning is essential to ensure the EPS is tested properly on the ground prior to launch. The results of the test performed on breadboard model hardware and analyses completed to date have been evaluated and used to plan for design qualification and flight acceptance test phases. These results and plans indicate the verification program for SSF's 75-kW EPS would have been successful and completed in time to support the scheduled first element launch.
Towards automatic planning for manufacturing generative processes
DOE Office of Scientific and Technical Information (OSTI.GOV)
CALTON,TERRI L.
2000-05-24
Generative process planning describes methods process engineers use to modify manufacturing/process plans after designs are complete. A completed design may be the result from the introduction of a new product based on an old design, an assembly upgrade, or modified product designs used for a family of similar products. An engineer designs an assembly and then creates plans capturing manufacturing processes, including assembly sequences, component joining methods, part costs, labor costs, etc. When new products originate as a result of an upgrade, component geometry may change, and/or additional components and subassemblies may be added to or are omitted from themore » original design. As a result process engineers are forced to create new plans. This is further complicated by the fact that the process engineer is forced to manually generate these plans for each product upgrade. To generate new assembly plans for product upgrades, engineers must manually re-specify the manufacturing plan selection criteria and re-run the planners. To remedy this problem, special-purpose assembly planning algorithms have been developed to automatically recognize design modifications and automatically apply previously defined manufacturing plan selection criteria and constraints.« less
Naval Remote Ocean Sensing System (NROSS) study
NASA Technical Reports Server (NTRS)
1983-01-01
A set of hardware similar to the SEASAT A configuration requirement, suitable for installation and operation aboard a NOAA-D bus and a budgetary cost for one (1) protoflight model was provided. The scatterometer sensor is conceived as one of several sensors for the Navy Remote Ocean Sensing System (NROSS) Satellite Program. Deliverables requested were to include a final report with appropriate sketches and block diagrams showing the scatterometer design/configuration and a budgetary cost for all labor and materials to design, fabricate, test, and integrate this hardware into a NOAA-D satellite bus. This configuration consists of two (2) hardware assembles - a transmitter/receiver (T/R) assembly and an integrated electronics assembly (IEA). The T/R assembly as conceived is best located at the extreme opposite end of the satellite away from the solar array assembly and oriented in position to enable one surface of the assembly to have unobstructed exposure to space. The IEA is planned to be located at the bottom (Earth viewing) side of the satellite and requires a radiating plate.
Interset: A natural language interface for teleoperated robotic assembly of the EASE space structure
NASA Technical Reports Server (NTRS)
Boorsma, Daniel K.
1989-01-01
A teleoperated robot was used to assemble the Experimental Assembly of Structures in Extra-vehicular activity (EASE) space structure under neutral buoyancy conditions, simulating a telerobot performing structural assembly in the zero gravity of space. This previous work used a manually controlled teleoperator as a test bed for system performance evaluations. From these results several Artificial Intelligence options were proposed. One of these was further developed into a real time assembly planner. The interface for this system is effective in assembling EASE structures using windowed graphics and a set of networked menus. As the problem space becomes more complex and hence the set of control options increases, a natural language interface may prove to be beneficial to supplement the menu based control strategy. This strategy can be beneficial in situations such as: describing the local environment, maintaining a data base of task event histories, modifying a plan or a heuristic dynamically, summarizing a task in English, or operating in a novel situation.
Planning and Control for Microassembly of Structures Composed of Stress-Engineered MEMS Microrobots
Donald, Bruce R.; Levey, Christopher G.; Paprotny, Igor; Rus, Daniela
2013-01-01
We present control strategies that implement planar microassembly using groups of stress-engineered MEMS microrobots (MicroStressBots) controlled through a single global control signal. The global control signal couples the motion of the devices, causing the system to be highly underactuated. In order for the robots to assemble into arbitrary planar shapes despite the high degree of underactuation, it is desirable that each robot be independently maneuverable (independently controllable). To achieve independent control, we fabricated robots that behave (move) differently from one another in response to the same global control signal. We harnessed this differentiation to develop assembly control strategies, where the assembly goal is a desired geometric shape that can be obtained by connecting the chassis of individual robots. We derived and experimentally tested assembly plans that command some of the robots to make progress toward the goal, while other robots are constrained to remain in small circular trajectories (closed-loop orbits) until it is their turn to move into the goal shape. Our control strategies were tested on systems of fabricated MicroStressBots. The robots are 240–280 μm × 60 μm × 7–20 μm in size and move simultaneously within a single operating environment. We demonstrated the feasibility of our control scheme by accurately assembling five different types of planar microstructures. PMID:23580796
Finite Progressive Planning for the Assembly Process in Footwear
NASA Astrophysics Data System (ADS)
Reyes, John; Aldás, Darwin; Salazar, Edisson; Armendáriz, Evelyn; Álvarez, Kevin; Núñez, José; García, Mario
2017-06-01
The scheduling of the operations of a manufacturing system is recognized for its efficiency in establishing a characteristic rate of production based on the forecasting of the ending date of an order. However, progressive planning focused on the footwear industries has not been studied in detail, since it is limited by the use of machines and supply according to the demand of the production line, whose development is based on just in time. The study proposes a finite progressive planning model in the area of footwear assembly that begins with analysis of the demand and identification of manufacturing constraints in order to establish an optimal ordering sequence. The results show manufacturing requirements through production orders that automatically determine production shifts per order, through experimentation of scenarios, the 25% increase in productivity indicators and a 31% improvement in efficiency are established. This improvement represents higher benefits for the industrial sector when establishing planning in the workplace.
1999-01-01
Some means currently under investigation include domain-speci c languages which are easy to check (e.g., PLAN), proof-carrying code [NL96, Nec97...domain-speci c language coupled to an extension system with heavyweight checks. In this way, the frequent (per- packet) dynamic checks are inexpensive...to CISC architectures remains problematic. Typed assembly language [MWCG98] propagates type safety information to the assembly language level, so
Planning Assembly Of Large Truss Structures In Outer Space
NASA Technical Reports Server (NTRS)
De Mello, Luiz S. Homem; Desai, Rajiv S.
1992-01-01
Report dicusses developmental algorithm used in systematic planning of sequences of operations in which large truss structures assembled in outer space. Assembly sequence represented by directed graph called "assembly graph", in which each arc represents joining of two parts or subassemblies. Algorithm generates assembly graph, working backward from state of complete assembly to initial state, in which all parts disassembled. Working backward more efficient than working forward because it avoids intermediate dead ends.
A knowledge-based design for assemble system for vehicle seat
NASA Astrophysics Data System (ADS)
Wahidin, L. S.; Tan, CheeFai; Khalil, S. N.; Juffrizal, K.; Nidzamuddin, M. Y.
2015-05-01
Companies worldwide are striving to reduce the costs of their products to impact their bottom line profitability. When it comes to improving profits, there are in two choices: sell more or cut the cost of what is currently being sold. Given the depressed economy of the last several years, the "sell more" option, in many cases, has been taken off the table. As a result, cost cutting is often the most effective path. One of the industrial challenges is to search for the shorten product development and lower manufacturing cost especially in the early stage of designing the product. Knowledge-based system is used to assist the industry when the expert is not available and to keep the expertise within the company. The application of knowledge-based system will enable the standardization and accuracy of the assembly process. For this purpose, a knowledge-based design for assemble system is developed to assist the industry to plan the assembly process of the vehicle seat.
Computational path planner for product assembly in complex environments
NASA Astrophysics Data System (ADS)
Shang, Wei; Liu, Jianhua; Ning, Ruxin; Liu, Mi
2013-03-01
Assembly path planning is a crucial problem in assembly related design and manufacturing processes. Sampling based motion planning algorithms are used for computational assembly path planning. However, the performance of such algorithms may degrade much in environments with complex product structure, narrow passages or other challenging scenarios. A computational path planner for automatic assembly path planning in complex 3D environments is presented. The global planning process is divided into three phases based on the environment and specific algorithms are proposed and utilized in each phase to solve the challenging issues. A novel ray test based stochastic collision detection method is proposed to evaluate the intersection between two polyhedral objects. This method avoids fake collisions in conventional methods and degrades the geometric constraint when a part has to be removed with surface contact with other parts. A refined history based rapidly-exploring random tree (RRT) algorithm which bias the growth of the tree based on its planning history is proposed and employed in the planning phase where the path is simple but the space is highly constrained. A novel adaptive RRT algorithm is developed for the path planning problem with challenging scenarios and uncertain environment. With extending values assigned on each tree node and extending schemes applied, the tree can adapts its growth to explore complex environments more efficiently. Experiments on the key algorithms are carried out and comparisons are made between the conventional path planning algorithms and the presented ones. The comparing results show that based on the proposed algorithms, the path planner can compute assembly path in challenging complex environments more efficiently and with higher success. This research provides the references to the study of computational assembly path planning under complex environments.
Analytical Verifications in Cryogenic Testing of NGST Advanced Mirror System Demonstrators
NASA Technical Reports Server (NTRS)
Cummings, Ramona; Levine, Marie; VanBuren, Dave; Kegley, Jeff; Green, Joseph; Hadaway, James; Presson, Joan; Cline, Todd; Stahl, H. Philip (Technical Monitor)
2002-01-01
Ground based testing is a critical and costly part of component, assembly, and system verifications of large space telescopes. At such tests, however, with integral teamwork by planners, analysts, and test personnel, segments can be included to validate specific analytical parameters and algorithms at relatively low additional cost. This paper opens with strategy of analytical verification segments added to vacuum cryogenic testing of Advanced Mirror System Demonstrator (AMSD) assemblies. These AMSD assemblies incorporate material and architecture concepts being considered in the Next Generation Space Telescope (NGST) design. The test segments for workmanship testing, cold survivability, and cold operation optical throughput are supplemented by segments for analytical verifications of specific structural, thermal, and optical parameters. Utilizing integrated modeling and separate materials testing, the paper continues with support plan for analyses, data, and observation requirements during the AMSD testing, currently slated for late calendar year 2002 to mid calendar year 2003. The paper includes anomaly resolution as gleaned by authors from similar analytical verification support of a previous large space telescope, then closes with draft of plans for parameter extrapolations, to form a well-verified portion of the integrated modeling being done for NGST performance predictions.
An Expert Supervisor For A Robotic Work Cell
NASA Astrophysics Data System (ADS)
Moed, M. C.; Kelley, R. B.
1988-02-01
To increase task flexibility in a robotic assembly environment, a hierarchical planning and execution system is being developed which will map user specified 3D part assembly tasks into various target robotic work cells, and execute these tasks efficiently using manipulators and sensors available in the work cell. One level of this hierarchy, the Supervisor, is responsible for assigning subtasks of a system generated Task Plan to a set of task specific Specialists and on-line coordination of the activity of these Specialists to accomplish the user specified assembly. The design of the Supervisor can be broken down into five major functional blocks: resource management; concurrency detection; task scheduling; error recovery; and interprocess communication. The Supervisor implementation has been completed on a VAX 11/750 under a Unix environment. PC card Pick-Insert experiments were performed to test this implementation. To test the robustness of the architecture, the Supervisor was then transported to a new work cell under a VMS environment. The experiments performed under Supervisor control in both implementations are discussed after a brief explanation of the functional blocks of the Supervisor and the other levels in the hierarchy.
ARCHITECTURAL, 777M, PHYSICS ASSEMBLY LABORATORY BUILDING, PLAN OF +131 AND ...
ARCHITECTURAL, 777-M, PHYSICS ASSEMBLY LABORATORY BUILDING, PLAN OF +13-1 AND +27-0 FLOOR LEVELS (W157114) - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC
NASA Technical Reports Server (NTRS)
Fuller, Sean; Dillon, William F.
2006-01-01
As the Space Shuttle continues flight, construction and assembly of the International Space Station (ISS) carries on as the United States and our International Partners resume the building, and continue to carry on the daily operations, of this impressive and historical Earth-orbiting research facility. In his January 14, 2004, speech announcing a new vision for America s space program, President Bush ratified the United States commitment to completing construction of the ISS by 2010. Since the launch and joining of the first two elements in 1998, the ISS and the partnership have experienced and overcome many challenges to assembly and operations, along with accomplishing many impressive achievements and historical firsts. These experiences and achievements over time have shaped our strategy, planning, and expectations. The continual operation and assembly of ISS leads to new knowledge about the design, development and operation of systems and hardware that will be utilized in the development of new deep-space vehicles needed to fulfill the Vision for Exploration and to generate the data and information that will enable our programs to return to the Moon and continue on to Mars. This paper will provide an overview of the complexity of the ISS Program, including a historical review of the major assembly events and operational milestones of the program, along with the upcoming assembly plans and scheduled missions of the space shuttle flights and ISS Assembly sequence.
In-orbit assembly mission for the Space Solar Power Station
NASA Astrophysics Data System (ADS)
Cheng, ZhengAi; Hou, Xinbin; Zhang, Xinghua; Zhou, Lu; Guo, Jifeng; Song, Chunlin
2016-12-01
The Space Solar Power Station (SSPS) is a large spacecraft that utilizes solar power in space to supply power to an electric grid on Earth. A large symmetrical integrated concept has been proposed by the China Academy of Space Technology (CAST). Considering its large scale, the SSPS requires a modular design and unitized general interfaces that would be assembled in orbit. Facilities system supporting assembly procedures, which include a Reusable Heavy Lift Launch Vehicle, orbital transfer and space robots, is introduced. An integrated assembly scheme utilizing space robots to realize this platform SSPS concept is presented. This paper tried to give a preliminary discussion about the minimized time and energy cost of the assembly mission under best sequence and route This optimized assembly mission planning allows the SSPS to be built in orbit rapidly, effectively and reliably.
NASA Technical Reports Server (NTRS)
Montemerlo, Melvin
1988-01-01
The Autonomous Systems focus on the automation of control systems for the Space Station and mission operations. Telerobotics focuses on automation for in-space servicing, assembly, and repair. The Autonomous Systems and Telerobotics each have a planned sequence of integrated demonstrations showing the evolutionary advance of the state-of-the-art. Progress is briefly described for each area of concern.
Classification Scheme for Items in CAAT.
ERIC Educational Resources Information Center
Epstein, Marion G.
In planning the development of the system for computer assisted assembly of tests, it was agreed at the outset that one of the basic requirements for the successful initiation of any such system would be the development of a detailed item content classification system. The design of the system for classifying item content is a key element in…
Proceedings of the NASA Conference on Space Telerobotics, volume 4
NASA Technical Reports Server (NTRS)
Rodriguez, Guillermo (Editor); Seraji, Homayoun (Editor)
1989-01-01
Papers presented at the NASA Conference on Space Telerobotics are compiled. The theme of the conference was man-machine collaboration in space. The conference provided a forum for researchers and engineers to exchange ideas on the research and development required for the application of telerobotic technology to the space systems planned for the 1990's and beyond. Volume 4 contains papers related to the following subject areas: manipulator control; telemanipulation; flight experiments (systems and simulators); sensor-based planning; robot kinematics, dynamics, and control; robot task planning and assembly; and research activities at the NASA Langley Research Center.
Task planning with uncertainty for robotic systems. Thesis
NASA Technical Reports Server (NTRS)
Cao, Tiehua
1993-01-01
In a practical robotic system, it is important to represent and plan sequences of operations and to be able to choose an efficient sequence from them for a specific task. During the generation and execution of task plans, different kinds of uncertainty may occur and erroneous states need to be handled to ensure the efficiency and reliability of the system. An approach to task representation, planning, and error recovery for robotic systems is demonstrated. Our approach to task planning is based on an AND/OR net representation, which is then mapped to a Petri net representation of all feasible geometric states and associated feasibility criteria for net transitions. Task decomposition of robotic assembly plans based on this representation is performed on the Petri net for robotic assembly tasks, and the inheritance of properties of liveness, safeness, and reversibility at all levels of decomposition are explored. This approach provides a framework for robust execution of tasks through the properties of traceability and viability. Uncertainty in robotic systems are modeled by local fuzzy variables, fuzzy marking variables, and global fuzzy variables which are incorporated in fuzzy Petri nets. Analysis of properties and reasoning about uncertainty are investigated using fuzzy reasoning structures built into the net. Two applications of fuzzy Petri nets, robot task sequence planning and sensor-based error recovery, are explored. In the first application, the search space for feasible and complete task sequences with correct precedence relationships is reduced via the use of global fuzzy variables in reasoning about subgoals. In the second application, sensory verification operations are modeled by mutually exclusive transitions to reason about local and global fuzzy variables on-line and automatically select a retry or an alternative error recovery sequence when errors occur. Task sequencing and task execution with error recovery capability for one and multiple soft components in robotic systems are investigated.
International Space Station Research Plan: Assembly Sequence. Revised
NASA Technical Reports Server (NTRS)
2000-01-01
These viewgraphs discuss the International Space Station's Research Plan. The goals for the International Space Station Utilization are to provide a state-of-the-art research facility on which to study gravity's effects on physical, chemical, and biological systems. It is also an advanced testbed for technology and human exploration as well as a commercial platform for space research and development.
Test plan : I-40 TTIS tourist intercept survey
DOT National Transportation Integrated Search
1998-06-01
This document assembles best practices and presents practical advice on how to acquire the software components of Intelligent Transportation Systems (ITS). The intended audience is the "customers" - the project leaders, technical contract managers, d...
NASA Technical Reports Server (NTRS)
Nevins, J. L.; Defazio, T. L.; Seltzer, D. S.; Whitney, D. E.
1981-01-01
The initial set of requirements for additional studies necessary to implement a space-borne, computer-based work system capable of achieving assembly, disassembly, repair, or maintenance in space were developed. The specific functions required of a work system to perform repair and maintenance were discussed. Tasks and relevant technologies were identified and delineated. The interaction of spacecraft design and technology options, including a consideration of the strategic issues of repair versus retrieval-replacement or destruction by removal were considered along with the design tradeoffs for accomplishing each of the options. A concept system design and its accompanying experiment or test plan were discussed.
NASA Technical Reports Server (NTRS)
Glaser, P. E.
1977-01-01
Microwave beaming of satellite-collected solar energy to earth for conversion to useful industrial power is evaluated for feasibility, with attention given to system efficiencies and costs, ecological impact, hardware to be employed, available options for energy conversion and transmission, and orbiting and assembly. Advantages of such a power generation and conversion system are listed, plausible techniques for conversion of solar energy (thermionic, thermal electric, photovoltaic) and transmission to earth (lasers, arrays of mirrors, microwave beams) are compared. Structural fatigue likely to result from brief daily eclipses, 55% system efficiency at the present state of the art, present projections of system costs, and projected economic implications of the technology are assessed. Two-stage orbiting and assembly plans are described.
The Pilot Land Data System: Report of the Program Planning Workshops
NASA Technical Reports Server (NTRS)
1984-01-01
An advisory report to be used by NASA in developing a program plan for a Pilot Land Data System (PLDS) was developed. The purpose of the PLDS is to improve the ability of NASA and NASA sponsored researchers to conduct land-related research. The goal of the planning workshops was to provide and coordinate planning and concept development between the land related science and computer science disciplines, to discuss the architecture of the PLDs, requirements for information science technology, and system evaluation. The findings and recommendations of the Working Group are presented. The pilot program establishes a limited scale distributed information system to explore scientific, technical, and management approaches to satisfying the needs of the land science community. The PLDS paves the way for a land data system to improve data access, processing, transfer, and analysis, which land sciences information synthesis occurs on a scale not previously permitted because of limits to data assembly and access.
Winter, Gabriele; Schaub, Karlheinz G; Großmann, Kay; Laun, Gerhard; Landau, Kurt; Bruder, Ralph
2012-01-01
Occupational hazards exist, if the design of the work situation is not in accordance with ergonomic design principles. At assembly lines ergonomics is applied to the design of work equipment and tasks and to work organisation. The ignoring of ergonomic principles in planning and design of assembly work leads to unfavourable working posture, action force and material handling. Disorders of the musculoskeletal system are of a common occurrence throughout Europe. Musculoskeletal disorders are a challenge against the background of disabled workers. The changes in a worker's capability have to be regarded in the conception of redesigned and new assembly lines. In this way ergonomics becomes progressively more important in planning and design of vehicles: The objective of ergonomic design in different stages of the vehicles development process is to achieve an optimal adaptation of the assembly work to workers. Hence the ergonomic screening tool "Design Check" (DC) was developed to identify ergonomic deficits in workplace layouts. The screening-tool is based on the current ergonomic state of the art in the design of physical work and relevant EU legal requirements. It was tested within a federal German research project at selected work stations at the assembly lines at Dr.-Ing. h.c. F. Porsche AG / Stuttgart. Meanwhile the application of the screening-tool DC is transferred in other parts of the Porsche AG, Stuttgart. It is also realized as an ergonomic standard method to perform assembly work in different phases of the vehicle development process.
Large Space Structures Fielding Plan
1991-01-01
15830 STS PAYLOARE SYSTESETY 3C (A %AA IASB STS DAYLCODSICARGO SRORM 1PVFR! PR 111L 5 SOL? CIE. JR-012 SAFETY 19LENEVIASO PLA PSOR 1, ,I -1 AR S’EATIOR...support/safety measures in space will interface. Although these features can be developed to some degree as stated objectives, many must be designed from...continuity 7. Check system for mechanical continuity 8. Verify LSS assembly continuity B. Productivity Measurements 1. Note duration of assembly activities
2006-12-01
robot is referred to as “emergent” since it is likely that the observed behavior is some extemporaneous blend of the possible behaviors that the...Report Meta Data message to contain data of any permissible type, arranged in any combination, and assembled extemporaneously by the publishing component...system (and especially the Decision Broker) to use the inferencing chain to extemporaneously assemble an explanation of how a certain conclusion has been
QUAD+ BWR Fuel Assembly demonstration program at Browns Ferry plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Doshi, P.K.; Mayhue, L.T.; Robert, J.T.
1984-04-01
The QUAD+ fuel assembly is an improved BWR fuel assembly designed and manufactured by Westinghouse Electric Corporation. The design features a water cross separating four fuel minibundles in an integral channel. A demonstration program for this fuel design is planned for late 1984 in cycle 6 of Browns Ferry 2, a TVA plant. Objectives for the design of the QUAD+ demonstration assemblies are compatibility in performance and transparency in safety analysis with the feed fuel. These objectives are met. Inspections of the QUAD+ demonstration assemblies are planned at each refueling outage.
Gholami, Somayeh; Mirzaei, Hamid Reza; Jabbary Arfaee, Ali; Jaberi, Ramin; Nedaie, Hassan Ali; Rabi Mahdavi, Seied; Rajab Bolookat, Eftekhar; Meigooni, Ali S
2016-01-01
Verification of dose distributions for gynecological (GYN) brachytherapy implants using EBT Gafchromic film. One major challenge in brachytherapy is to verify the accuracy of dose distributions calculated by a treatment planning system. A new phantom was designed and fabricated using 90 slabs of 18 cm × 16 cm × 0.2 cm Perspex to accommodate a tandem and Ovoid assembly, which is normally used for GYN brachytherapy treatment. This phantom design allows the use of EBT Gafchromic films for dosimetric verification of GYN implants with a cobalt-60 HDR system or a LDR Cs-137 system. Gafchromic films were exposed using a plan that was designed to deliver 1.5 Gy of dose to 0.5 cm distance from the lateral surface of ovoids from a pair of ovoid assembly that was used for treatment vaginal cuff. For a quantitative analysis of the results for both LDR and HDR systems, the measured dose values at several points of interests were compared with the calculated data from a commercially available treatment planning system. This planning system was utilizing the TG-43 formalism and parameters for calculation of dose distributions around a brachytherapy implant. The results of these investigations indicated that the differences between the calculated and measured data at different points were ranging from 2.4% to 3.8% for the LDR Cs-137 and HDR Co-60 systems, respectively. The EBT Gafchromic films combined with the newly designed phantom could be utilized for verification of the dose distributions around different GYN implants treated with either LDR or HDR brachytherapy procedures.
NASA Technical Reports Server (NTRS)
1976-01-01
Program plans, schedules, and costs are determined for a synchronous orbit-based power generation and relay system. Requirements for the satellite solar power station (SSPS) and the power relay satellite (PRS) are explored. Engineering analysis of large solar arrays, flight mechanics and control, transportation, assembly and maintenance, and microwave transmission are included.
Optimum-AIV: A planning and scheduling system for spacecraft AIV
NASA Technical Reports Server (NTRS)
Arentoft, M. M.; Fuchs, Jens J.; Parrod, Y.; Gasquet, Andre; Stader, J.; Stokes, I.; Vadon, H.
1991-01-01
A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.
First reusable spaceship prepared for second mission
NASA Technical Reports Server (NTRS)
1981-01-01
The inspection, repair, and modification of the space shuttle Columbia prior vehicle assembly and roll out for the second space transportation system flight are described. The schedule for launch countdown and a preliminary sketch of plans for the second flight are presented.
Using the SPICE system to help plan and interpret space science observations
NASA Technical Reports Server (NTRS)
Acton, Charles H., Jr.
1993-01-01
A portable multimission information system named SPICE is used to assemble, archive, and provide easy user access to viewing geometry and other ancillary information needed by space scientists to interpret observations of bodies within our solar system. The modular nature of this system lends it to use in planning such observations as well. With a successful proof of concept on Voyager, the SPICE system has been adapted to the Magellan, Galileo and Mars Observer missions, and to a variety of ground based operations. Adaptation of SPICE for Cassini and the Russian Mars 94/96 projects is underway, and work on Cassini will follow, SPICE has been used to support observation planning for moving targets on the Hubble Space Telescope Project. Applications for SPICE on earth science, space physics and other astrophysics missions are under consideration.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. A shipping container transporting part of the new Orbiter Boom Sensor System (OBSS) is delivered by truck to the Remote Manipulator System lab in the Vehicle Assembly Building (VAB). Once the entire structure has arrived, the OBSS will be assembled and undergo final checkout and testing in the lab prior to being transferred to the Orbiter Processing Facility (OPF) for installation on Space Shuttle Discovery. The 50-foot-long OBSS will be attached to the Remote Manipulator System, or Shuttle arm, and is one of the new safety measures for Return to Flight, equipping the orbiter with cameras and laser systems to inspect the Shuttle's Thermal Protection System while in space. Discovery is slated to fly mission STS-114 once Space Shuttle launches resume. The launch planning window is May 12 to June 3, 2005.
Carbon Dioxide Reduction Post-Processing Sub-System Development
NASA Technical Reports Server (NTRS)
Abney, Morgan B.; Miller, Lee A.; Greenwood, Zachary; Barton, Katherine
2012-01-01
The state-of-the-art Carbon Dioxide (CO2) Reduction Assembly (CRA) on the International Space Station (ISS) facilitates the recovery of oxygen from metabolic CO2. The CRA utilizes the Sabatier process to produce water with methane as a byproduct. The methane is currently vented overboard as a waste product. Because the CRA relies on hydrogen for oxygen recovery, the loss of methane ultimately results in a loss of oxygen. For missions beyond low earth orbit, it will prove essential to maximize oxygen recovery. For this purpose, NASA is exploring an integrated post-processor system to recover hydrogen from CRA methane. The post-processor, called a Plasma Pyrolysis Assembly (PPA) partially pyrolyzes methane to recover hydrogen with acetylene as a byproduct. In-flight operation of post-processor will require a Methane Purification Assembly (MePA) and an Acetylene Separation Assembly (ASepA). Recent efforts have focused on the design, fabrication, and testing of these components. The results and conclusions of these efforts will be discussed as well as future plans.
Rocket welding tool ready on This Week @NASA - September 12, 2014
2014-09-12
NASA Administrator Charlie Bolden, other NASA officials and representatives from The Boeing Company participated in a September 12 ribbon cutting for the new 170-foot-high Vertical Assembly Center at NASA’s Michoud Assembly Facility in New Orleans. The Vertical Assembly Center is a new tool that will be used to assemble parts of NASA’s Space Launch System rocket that will send humans to an asteroid and Mars. The administrator also visited Stennis Space Center in nearby Bay St. Louis, Mississippi, where engineers plan to test the RS-25 engines that will power the core stage of SLS. Also, Orion moved for fueling, Curiosity to climb Martian mountain, Possible geological activity on Europa, Expedition 40 returns, Earth Science on ISS and Hurricane-hunting aircraft!
2009-07-10
CAPE CANAVERAL, Fla. – A lightning strike on Launch Pad 39A at NASA's Kennedy Space Center in Florida is captured by an Operational Television camera. Eleven lightning strikes occurred within .35 miles of the pad during a thunderstorm July 10 as space shuttle Endeavour was prepared for launch. Mission managers decided to delay Endeavour's planned liftoff July 11 as a precaution to allow engineers and safety personnel time to analyze data and retest systems on the orbiter and solid rockets boosters. The next launch attempt for the STS-127 mission is planned for Sunday, July 12, at 7:13 p.m. EDT. The Operational Television cameras can be used to triangulate the location of lightning strikes. Other detection systems include the Cloud-To-Ground Lightning Surveillance System, Strikenet/National Lightning Detection Network, Lightning Induced Voltage Instrumentation System and the Catenary Wire Lightning Instrumentation System. Endeavour will deliver the Japanese Experiment Module's Exposed Facility, or JEM-EF, and the Experiment Logistics Module-Exposed Section, or ELM-ES, in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station. STS-127 is the 29th flight for the assembly of the space station. Photo credit: NASA/Analex
The School of the Future. Stelco Trend. Number 34 in a Series.
ERIC Educational Resources Information Center
Walker, Howard V.; Arthur, E. R.
Floor plans and illustrations present a simplified building system for an elementary school that can be utilized by any school board. All components for the system can be drawn from existing products and readily integrated with the structure. The component assembly and connections are illustrated in detail. Factory production is utilized to reduce…
Employers Talk about Building a School-to-Work System: Voices from the Field.
ERIC Educational Resources Information Center
Wills, Joan L., Ed.
This document contains background information on the school-to-work (STW) movement and 20 essays written by employers and intermediaries involved in STW program planning and implementation. Four points are highlighted: (1) it takes time to assemble an STW system; (2) the number of students participating in structured work-based learning remains…
“A System for Automatically Maintaining Pressure in a Commercial Truck Tire”
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maloney, John
2017-07-07
Under-inflated tires significantly reduce a vehicle’s fuel efficiency by increasing rolling resistance (drag force). The Air Maintenance Technology (“AMT”) system developed through this project replenishes lost air and maintains optimal tire cavity pressure whenever the tire is rolling in service, thus improving overall fuel economy by reducing the tire’s rolling resistance. The system consists of an inlet air filter, an air pump driven by tire deformation during rotation, and a pressure regulating device. Pressurized air in the tire cavity naturally escapes by diffusion through the tire and wheel, leaks in tire seating, and through the filler valve and its seating.more » As a result, tires require constant maintenance to replenish lost air. Since manual tire inflation maintenance is both labor intensive and time consuming, it is frequently overlooked or ignored. By automating the maintenance of optimal tire pressure, the tire’s contribution to the vehicle’s overall fuel economy can be maximized. The work was divided into three phases. The objectives of Phase 1, Planning and Initial Design, resulted in an effective project plan and to create a baseline design. The objectives for Phase 2, Design and Process Optimization, were: to identify finalized design for the pump, regulator and filter components; identify a process to build prototype tires; assemble prototype tires; test prototype tires and document results. The objectives of Phase 3, Design Release and Industrialization, were to finalize system tire assembly, perform release testing and industrialize the assembly process.« less
1989-12-15
conditions of these experiments. In order to provide reliable quantitative data on exposure, a system with automated dosimetry was developed, and tested...exposure system and dosimetry, and (2) studies on lymphocyte cultures, and (3) conclusions. EXPOSURE SYSTEM AND DOSIMETRY Description of the Exposure... System The experiments planned in this project necessitated the design and assembly of an exposure system that would meet several engineering
System design package for IBM system one: solar heating and domestic hot water
NASA Technical Reports Server (NTRS)
1977-01-01
This report is a collation of documents and drawings that describe a prototype solar heating and hot water system using air as the collector fluid and a pebble bed for heat storage. The system was designed for installation into a single family dwelling. The description, performance specification, subsystem drawings, verification plan/procedure, and hazard analysis of the system was packaged for evaluation of the system with information sufficient to assemble a similar system.
System Design Package for SIMS Prototype System 3, Solar Heating and Domestic Hot Water
NASA Technical Reports Server (NTRS)
1978-01-01
A collation of documents and drawings are presented that describe a prototype solar heating and hot water system using liquid flat plate collectors and a gas or electric furnace energy subsystem. The system was designed for installation into a single-family dwelling. The description, performance specification, subsystem drawings, verification plan/procedure, and hazard analysis of the system are packaged for evaluation of the system with information sufficient to assemble a similar system.
Planning and reasoning in the JPL telerobot testbed
NASA Technical Reports Server (NTRS)
Peters, Stephen; Mittman, David; Collins, Carol; Omeara, Jacquie; Rokey, Mark
1990-01-01
The Telerobot Interactive Planning System is developed to serve as the highest autonomous-control level of the Telerobot Testbed. A recent prototype is described which integrates an operator interface for supervisory control, a task planner supporting disassembly and re-assembly operations, and a spatial planner for collision-free manipulator motion through the workspace. Each of these components is described in detail. Descriptions of the technical problem, approach, and lessons learned are included.
Nuclear reactors built, being built, or planned, 1991
DOE Office of Scientific and Technical Information (OSTI.GOV)
Simpson, B.
1992-07-01
This document contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1991. The book is divided into three major sections: Section 1 consists of a reactor locator map and reactor tables; Section 2 includes nuclear reactors that are operating, being built, or planned; and Section 3 includes reactors that have been shut down permanently or dismantled. Sections 2 and 3 contain the following classification of reactors: Civilian, Production, Military, Export, and Critical Assembly. Export reactor refers to a reactor for which the principal nuclear contractor ismore » an American company -- working either independently or in cooperation with a foreign company (Part 4, in each section). Critical assembly refers to an assembly of fuel and assembly of fuel and moderator that requires an external source of neutrons to initiate and maintain fission. A critical assembly is used for experimental measurements (Part 5).« less
Evolution and advanced technology. [of Flight Telerobotic Servicer
NASA Technical Reports Server (NTRS)
Ollendorf, Stanford; Pennington, Jack E.; Hansen, Bert, III
1990-01-01
The NASREM architecture with its standard interfaces permits development and evolution of the Flight Telerobotic Servicer to greater autonomy. Technologies in control strategies for an arm with seven DOF, including a safety system containing skin sensors for obstacle avoidance, are being developed. Planning and robotic execution software includes symbolic task planning, world model data bases, and path planning algorithms. Research over the last five years has led to the development of laser scanning and ranging systems, which use coherent semiconductor laser diodes for short range sensing. The possibility of using a robot to autonomously assemble space structures is being investigated. A control framework compatible with NASREM is being developed that allows direct global control of the manipulator. Researchers are developing systems that permit an operator to quickly reconfigure the telerobot to do new tasks safely.
7. PHOTOCOPY, PLANS, ELEVATIONS, AND SECTION DRAWING FOR MISSILE TEST ...
7. PHOTOCOPY, PLANS, ELEVATIONS, AND SECTION DRAWING FOR MISSILE TEST AND ASSEMBLY BUILDING. - NIKE Missile Base SL-40, Missile Test & Assembly Building, South end of launch area, northeast of Generator Building No. 3, Hecker, Monroe County, IL
7. PHOTOCOPY, PLUMBING AND MECHANICAL PLAN AND DETAILS FOR UNDERGROUND ...
7. PHOTOCOPY, PLUMBING AND MECHANICAL PLAN AND DETAILS FOR UNDERGROUND STORAGE MAGAZINES AND LAUNCHER-LOADER ASSEMBLIES. - NIKE Missile Base SL-40, Underground Storage Magazines & Launcher-Loader Assemblies, Southwesternmost end of launch area, Hecker, Monroe County, IL
8. PHOTOCOPY, ARCHITECTURAL FLOOR PLAN AND DETAIL DRAWING OF UNDERGROUND ...
8. PHOTOCOPY, ARCHITECTURAL FLOOR PLAN AND DETAIL DRAWING OF UNDERGROUND STORAGE MAGAZINES AND LAUNCHER-LOADER ASSEMBLIES. - NIKE Missile Base SL-40, Underground Storage Magazines & Launcher-Loader Assemblies, Southwesternmost end of launch area, Hecker, Monroe County, IL
Implementation of a robotic flexible assembly system
NASA Technical Reports Server (NTRS)
Benton, Ronald C.
1987-01-01
As part of the Intelligent Task Automation program, a team developed enabling technologies for programmable, sensory controlled manipulation in unstructured environments. These technologies include 2-D/3-D vision sensing and understanding, force sensing and high speed force control, 2.5-D vision alignment and control, and multiple processor architectures. The subsequent design of a flexible, programmable, sensor controlled robotic assembly system for small electromechanical devices is described using these technologies and ongoing implementation and integration efforts. Using vision, the system picks parts dumped randomly in a tray. Using vision and force control, it performs high speed part mating, in-process monitoring/verification of expected results and autonomous recovery from some errors. It is programmed off line with semiautomatic action planning.
A Virtual Laboratory for the 4 Bed Molecular Sieve of the Carbon Dioxide Removal Assembly
NASA Technical Reports Server (NTRS)
Coker, Robert; Knox, James; O'Connor, Brian
2016-01-01
Ongoing work to improve water and carbon dioxide separation systems to be used on crewed space vehicles combines sub-scale systems testing and multi-physics simulations. Thus, as part of NASA's Advanced Exploration Systems (AES) program and the Life Support Systems Project (LSSP), fully predictive COMSOL Multiphysics models of the Four Bed Molecular Sieve (4BMS) of the Carbon Dioxide Removal Assembly (CDRA) on the International Space Station (ISS) have been developed. This Virtual Laboratory is being used to help reduce mass, power, and volume requirements for exploration missions. In this paper we describe current and planned modeling developments in the area of carbon dioxide removal to support future missions as well as the resolution of anomalies observed in the ISS CDRA.
Vibroacoustic test plan evaluation: Parameter variation study
NASA Technical Reports Server (NTRS)
Stahle, C. V.; Gongloef, H. R.
1976-01-01
Statistical decision models are shown to provide a viable method of evaluating the cost effectiveness of alternate vibroacoustic test plans and the associated test levels. The methodology developed provides a major step toward the development of a realistic tool to quantitatively tailor test programs to specific payloads. Testing is considered at the no test, component, subassembly, or system level of assembly. Component redundancy and partial loss of flight data are considered. Most and probabilistic costs are considered, and incipient failures resulting from ground tests are treated. Optimums defining both component and assembly test levels are indicated for the modified test plans considered. modeling simplifications must be considered in interpreting the results relative to a particular payload. New parameters introduced were a no test option, flight by flight failure probabilities, and a cost to design components for higher vibration requirements. Parameters varied were the shuttle payload bay internal acoustic environment, the STS launch cost, the component retest/repair cost, and the amount of redundancy in the housekeeping section of the payload reliability model.
RECOVER: An Automated Cloud-Based Decision Support System for Post-fire Rehabilitation Planning
NASA Technical Reports Server (NTRS)
Schnase, John L.; Carroll, Mark; Weber, K. T.; Brown, Molly E.; Gill, Roger L.; Wooten, Margaret; May J.; Serr, K.; Smith, E.; Goldsby, R.;
2014-01-01
RECOVER is a site-specific decision support system that automatically brings together in a single analysis environment the information necessary for post-fire rehabilitation decision-making. After a major wildfire, law requires that the federal land management agencies certify a comprehensive plan for public safety, burned area stabilization, resource protection, and site recovery. These burned area emergency response (BAER) plans are a crucial part of our national response to wildfire disasters and depend heavily on data acquired from a variety of sources. Final plans are due within 21 days of control of a major wildfire and become the guiding document for managing the activities and budgets for all subsequent remediation efforts. There are few instances in the federal government where plans of such wide-ranging scope and importance are assembled on such short notice and translated into action more quickly. RECOVER has been designed in close collaboration with our agency partners and directly addresses their high-priority decision-making requirements. In response to a fire detection event, RECOVER uses the rapid resource allocation capabilities of cloud computing to automatically collect Earth observational data, derived decision products, and historic biophysical data so that when the fire is contained, BAER teams will have a complete and ready-to-use RECOVER dataset and GIS analysis environment customized for the target wildfire. Initial studies suggest that RECOVER can transform this information-intensive process by reducing from days to a matter of minutes the time required to assemble and deliver crucial wildfire-related data.
RECOVER: An Automated, Cloud-Based Decision Support System for Post-Fire Rehabilitation Planning
NASA Astrophysics Data System (ADS)
Schnase, J. L.; Carroll, M. L.; Weber, K. T.; Brown, M. E.; Gill, R. L.; Wooten, M.; May, J.; Serr, K.; Smith, E.; Goldsby, R.; Newtoff, K.; Bradford, K.; Doyle, C.; Volker, E.; Weber, S.
2014-11-01
RECOVER is a site-specific decision support system that automatically brings together in a single analysis environment the information necessary for post-fire rehabilitation decision-making. After a major wildfire, law requires that the federal land management agencies certify a comprehensive plan for public safety, burned area stabilization, resource protection, and site recovery. These burned area emergency response (BAER) plans are a crucial part of our national response to wildfire disasters and depend heavily on data acquired from a variety of sources. Final plans are due within 21 days of control of a major wildfire and become the guiding document for managing the activities and budgets for all subsequent remediation efforts. There are few instances in the federal government where plans of such wide-ranging scope and importance are assembled on such short notice and translated into action more quickly. RECOVER has been designed in close collaboration with our agency partners and directly addresses their high-priority decision-making requirements. In response to a fire detection event, RECOVER uses the rapid resource allocation capabilities of cloud computing to automatically collect Earth observational data, derived decision products, and historic biophysical data so that when the fire is contained, BAER teams will have a complete and ready-to-use RECOVER dataset and GIS analysis environment customized for the target wildfire. Initial studies suggest that RECOVER can transform this information-intensive process by reducing from days to a matter of minutes the time required to assemble and deliver crucial wildfire-related data.
SP-100 GES/NAT radiation shielding systems design and development testing
NASA Astrophysics Data System (ADS)
Disney, Richard K.; Kulikowski, Henry D.; McGinnis, Cynthia A.; Reese, James C.; Thomas, Kevin; Wiltshire, Frank
1991-01-01
Advanced Energy Systems (AES) of Westinghouse Electric Corporation is under subcontract to the General Electric Company to supply nuclear radiation shielding components for the SP-100 Ground Engineering System (GES) Nuclear Assembly Test to be conducted at Westinghouse Hanford Company at Richland, Washington. The radiation shielding components are integral to the Nuclear Assembly Test (NAT) assembly and include prototypic and non-prototypic radiation shielding components which provide prototypic test conditions for the SP-100 reactor subsystem and reactor control subsystem components during the GES/NAT operations. W-AES is designing three radiation shield components for the NAT assembly; a prototypic Generic Flight System (GFS) shield, the Lower Internal Facility Shield (LIFS), and the Upper Internal Facility Shield (UIFS). This paper describes the design approach and development testing to support the design, fabrication, and assembly of these three shield components for use within the vacuum vessel of the GES/NAT. The GES/NAT shields must be designed to operate in a high vacuum which simulates space operations. The GFS shield and LIFS must provide prototypic radiation/thermal environments and mechanical interfaces for reactor system components. The NAT shields, in combination with the test facility shielding, must provide adequate radiation attenuation for overall test operations. Special design considerations account for the ground test facility effects on the prototypic GFS shield. Validation of the GFS shield design and performance will be based on detailed Monte Carlo analyses and developmental testing of design features. Full scale prototype testing of the shield subsystems is not planned.
Force-Based Reasoning for Assembly Planning and Subassembly Stability Analysis
NASA Technical Reports Server (NTRS)
Lee, S.; Yi, C.; Wang, F-C.
1993-01-01
In this paper, we show that force-based reasoning, for identifying a cluster of parts that can be decomposed naturally by the applied force, plays an important role in selecting feasible subassemblies and analyzing subassembly stability in assembly planning.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. A shipping container housing part of the new Orbiter Boom Sensor System (OBSS) is lifted from a truck into the Remote Manipulator System lab in the Vehicle Assembly Building (VAB). Once the entire structure has arrived, the OBSS will be assembled and undergo final checkout and testing in the lab prior to being transferred to the Orbiter Processing Facility (OPF) for installation on Space Shuttle Discovery. The 50-foot- long OBSS will be attached to the Remote Manipulator System, or Shuttle arm, and is one of the new safety measures for Return to Flight, equipping the orbiter with cameras and laser systems to inspect the Shuttle's Thermal Protection System while in space. Discovery is slated to fly mission STS-114 once Space Shuttle launches resume. The launch planning window is May 12 to June 3, 2005.
In-Orbit Servicing: The Master Enabler
NASA Technical Reports Server (NTRS)
Reed, Benjamin B.; Kienlen, Michael; Naasz, Bo; Roberts, Brian; Deweese, Keith
2015-01-01
Some of the most noteworthy missions in space exploration have occurred in the last two decades and owe their success to on-orbit servicing. The tremendously successful Hubble Space Telescope repair and upgrade missions, as well as the completed assembly of the International Space Station (ISS) and its full utilization, lead us to the next chapter and set of challenges. These include fully exploiting the many space systems already launched, assembling large structures in situ thereby enabling new scientific discoveries, and providing systems that reliably and cost-effectively support the next steps in space exploration. In-orbit servicing is a tool--a tool that can serve as the master enabler to create space architectures that would otherwise be unattainable. This paper will survey how NASA's satellite-servicing technology development efforts are being applied to the planning and execution of two such ambitious missions, specifically asteroid capture and the in-space assembly of a very large life-finding telescope.
The Master Enabler: In Orbit Servicing
NASA Technical Reports Server (NTRS)
Reed, Benjamin B.; Kienlen, Michael; Naasz, Bo; Roberts, Brian; Deweese, Keith; Cassidy, Justin
2015-01-01
Some of the most noteworthy missions in space exploration have occurred in the last two decades and owe their success to on-orbit servicing. The tremendously successful Hubble Space Telescope repair and upgrade missions, as well as the completed assembly of the International Space Station (ISS) and its full utilization, lead us to the next chapter and set of challenges. These include fully exploiting the many space systems already launched, assembling large structures in situ thereby enabling new scientific discoveries, and providing systems that reliably and cost-effectively support the next steps in space exploration. In-orbit servicing is a tool--a tool that can serve as the master enabler to create space architectures that would otherwise be unattainable. This paper will survey how NASA's satellite-servicing technology development efforts are being applied to the planning and execution of two such ambitious missions, specifically asteroid capture and the in-space assembly of a very large life-finding telescope.
Investigation of DMSD Trend in the ISS Water Processor Assembly
NASA Technical Reports Server (NTRS)
Carter, Layne; Bowman, Elizabeth; Wilson, Mark; Gentry, Greg; Rector, Tony
2013-01-01
The ISS Water Recovery System (WRS) is responsible for providing potable water to the crew, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. The WRS includes the Water Processor Assembly (WPA) and the Urine Processor Assembly (UPA). The WPA processes condensate from the cabin air and distillate produced by the UPA. In 2010, an increasing trend in the Total Organic Carbon (TOC) in the potable water was ultimately identified as dimethylsilanediol (DMSD). The increasing trend was ultimately reversed after replacing the WPA's two multifiltration beds. However, the reason for the TOC trend and the subsequent recovery was not understood. A subsequent trend occurred in 2012. This paper summarizes the current understanding of the fate of DMSD in the WPA, how the increasing TOC trend occurred, and the plan for modifying the WPA to prevent recurrence.
The "Master Enabler" - In-Orbit Servicing
NASA Technical Reports Server (NTRS)
Reed, Benjamin; Kienlen, Michael; Naasz, Bo; Roberts, Brian; Deweese, Keith; Cassidy, Justin
2015-01-01
Some of the most noteworthy missions in space exploration have occurred in the last two decades and owe their success to on-orbit servicing. The tremendously successful Hubble Space Telescope repair and upgrade missions, as well as the completed assembly of the International Space Station (ISS) and its full utilization, lead us to the next chapter and set of challenges. These include fully exploiting the many space systems already launched, assembling large structures in situ thereby enabling new scientific discoveries, and providing systems that reliably and cost-effectively support the next steps in space exploration. In-orbit servicing is a tool-a tool that can serve as the master enabler to create space architectures that would otherwise be unattainable. This paper will survey how NASA's satellite-servicing technology development efforts are being applied to the planning and execution of two such ambitious missions, specifically asteroid capture and the in-space assembly of a very large life-finding telescope.
Additively Manufactured Main Fuel Valve Housing
NASA Technical Reports Server (NTRS)
Eddleman, David; Richard, Jim
2015-01-01
Selective Laser Melting (SLM) was utilized to fabricate a liquid hydrogen valve housing typical of those found in rocket engines and main propulsion systems. The SLM process allowed for a valve geometry that would be difficult, if not impossible to fabricate by traditional means. Several valve bodies were built by different SLM suppliers and assembled with valve internals. The assemblies were then tested with liquid nitrogen and operated as desired. One unit was also burst tested and sectioned for materials analysis. The design, test results, and planned testing are presented herein.
A Year in the Life of International Space Station
NASA Technical Reports Server (NTRS)
Uri, John J.
2006-01-01
The past twelve months (October 2005 to September 2006) have been among the busiest in the life of the International Space Station (ISS), both in terms of on-orbit operations as well as future planning, for both ISS systems and research. The Expedition 12 and 13 crews completed their missions successfully, carrying out research for Russia, the United States, Europe and Japan, and bringing continuous ISS occupancy to nearly six years. The European Space Agency's (ESA) first Long Duration Mission on ISS is underway, involving significant international research. The Expedition 14 crew completed its training and is embarking on its own 6-month mission with a full slate of international research. Future crews are in training for their respective assembly and research missions. Shuttle flights resumed after a 10-month hiatus, delivering new research facilities and resuming assembly of ISS. ESA's Columbus research module was delivered to the Kennedy Space Center, joining Japan's Kibo research module already there. Following preflight testing, the two modules will launch in 2007 and 2008, respectively, joining Destiny as ISS's research infrastructure. A revised ISS configuration and assembly sequence were endorsed by all the Partners, with a reduced number of Shuttle flights, but for the first time including plans for post-Shuttle ISS operations after 2010. The new plan will pose significant challenges to the ISS research community. As Europe and Japan build their on-orbit research infrastructure, and long-term plans become firmer, the next 12 months should prove to be equally challenging and exciting.
Using the ISS as a Testbed to Prepare for the Next Generation of Space-Based Telescopes
NASA Technical Reports Server (NTRS)
Ess, Kim; Thronson, Harley; Boyles, Mark; Sparks, William; Postman, Marc; Carpenter, Kenneth
2012-01-01
The ISS provides a unique opportunity to develop the technologies and operational capabilities necessary to assemble future large space telescopes that may be used to investigate planetary systems around neighboring stars. Assembling telescopes in space is a paradigm-shifting approach to space astronomy. Using the ISS as a testbed will reduce the technical risks of implementing this major scientific facility, such as laser metrology and wavefront sensing and control (WFSC). The Optical Testbed and Integration on ISS eXperiment (OpTIIX) will demonstrate the robotic assembly of major components, including the primary and secondary mirrors, to mechanical tolerances using existing ISS infrastructure, and the alignment of the optical elements to a diffraction-limited optical system in space. Assembling the optical system and removing and replacing components via existing ISS capabilities, such as the Special Purpose Dexterous Manipulator (SPDM) or the ISS flight crew, allows for future experimentation and repair, if necessary. First flight on ISS for OpTIIX, a small 1.5 meter optical telescope, is planned for 2015. In addition to demonstration of key risk-retiring technologies, the OpTIIX program includes a public outreach program to show the broad value of ISS utilization.
102. JOB NO. 1347F, SHEET 3, 1927, ASSEMBLY BUILDING; FORD ...
102. JOB NO. 1347-F, SHEET 3, 1927, ASSEMBLY BUILDING; FORD MOTOR COMPANY; FIRST FLOOR PLAN - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA
NASA Technical Reports Server (NTRS)
Jones, Harry W.
2016-01-01
A review of two papers on improving the International Space Station (ISS) Oxygen Generation Assembly (OGA) shows that it would not save substantial mass on a Mars transit. The ISS OGA requires redesign for satisfactory operation, even for the ISS. The planned improvements of the OGA for ISS would not be sufficient to make it suitable for Mars, because Mars transit life support has significantly different requirements than ISS. The OGA for Mars should have lower mass, better reliability and maintainability, greater safety, radiation hardening, and capability for quiescent operation. NASA's methodical, disciplined systems engineering process should be used to develop the appropriate system.
Advanced construction management for lunar base construction - Surface operations planner
NASA Technical Reports Server (NTRS)
Kehoe, Robert P.
1992-01-01
The study proposes a conceptual solution and lays the framework for developing a new, sophisticated and intelligent tool for a lunar base construction crew to use. This concept integrates expert systems for critical decision making, virtual reality for training, logistics and laydown optimization, automated productivity measurements, and an advanced scheduling tool to form a unique new planning tool. The concept features extensive use of computers and expert systems software to support the actual work, while allowing the crew to control the project from the lunar surface. Consideration is given to a logistics data base, laydown area management, flexible critical progress scheduler, video simulation of assembly tasks, and assembly information and tracking documentation.
NASA Technical Reports Server (NTRS)
Homemdemello, Luiz S.
1992-01-01
An assembly planner for tetrahedral truss structures is presented. To overcome the difficulties due to the large number of parts, the planner exploits the simplicity and uniformity of the shapes of the parts and the regularity of their interconnection. The planning automation is based on the computational formalism known as production system. The global data base consists of a hexagonal grid representation of the truss structure. This representation captures the regularity of tetrahedral truss structures and their multiple hierarchies. It maps into quadratic grids and can be implemented in a computer by using a two-dimensional array data structure. By maintaining the multiple hierarchies explicitly in the model, the choice of a particular hierarchy is only made when needed, thus allowing a more informed decision. Furthermore, testing the preconditions of the production rules is simple because the patterned way in which the struts are interconnected is incorporated into the topology of the hexagonal grid. A directed graph representation of assembly sequences allows the use of both graph search and backtracking control strategies.
Pre-integrated structures for Space Station Freedom
NASA Technical Reports Server (NTRS)
Cruz, Jonathan N.; Monell, Donald W.; Mutton, Philip; Troutman, Patrick A.
1991-01-01
An in-space construction (erectable) approach to assembling Freedom is planned but the increasing complexity of the station design along with a decrease in shuttle capability over the past several years has led to an assembly sequence that requires more resources (EVA, lift, volume) than the shuttle can provide given a fixed number of flights. One way to address these issues is to adopt a pre-integrated approach to assembling Freedom. A pre-integrated approach combines station primary structure and distributed systems into discrete sections that are assembled and checked out on the ground. The section is then launched as a single structural entity on the shuttle and attached to the orbiting station is then launched as a single structural entity on the shuttle and attached to the orbiting station with a minimum of EVA. The feasibility of a pre-integrated approach to assembling Freedon is discussed. The structural configuration, packaging, and shuttle integration of discrete pre-integrated elements for Freedom assembly are discussed. It is shown that the pre-integrated approach to assembly reduces EVA and increases shuttle margin with respect to mass, volume, and center of gravity limits when compared to the baseline Freedom assembly sequence.
Systems engineering studies of on-orbit assembly operation
NASA Technical Reports Server (NTRS)
Morgenthaler, George W.
1991-01-01
While the practice of construction has a long history, the underlying theory of construction is relatively young. Very little has been documented as to techniques of logistic support, construction planning, construction scheduling, construction testing, and inspection. The lack of 'systems approaches' to construction processes is certainly one of the most serious roadblocks to the construction of space structures. System engineering research efforts at CSC are aimed at developing concepts and tools which contribute to a systems theory of space construction. The research is also aimed at providing means for trade-offs of design parameters for other research areas in CSC. Systems engineering activity at CSC has divided space construction into the areas of orbital assembly, lunar base construction, interplanetary transport vehicle construction, and Mars base construction. A brief summary of recent results is given. Several models for 'launch-on-time' were developed. Launch-on-time is a critical concept to the assembly of such Earth-orbiting structures as the Space Station Freedom, and to planetary orbiters such as the Mars transfer vehicle. CSC has developed a launch vehicle selection model which uses linear programming to find optimal combinations of launch vehicles of various sizes (Atlas, Titan, Shuttles, HLLV's) to support SEI missions. Recently, the Center developed a cost trade-off model for studying on orbit assembly logistics. With this model it was determined that the most effective size of the HLLV would be in the range of 120 to 200 metric tons to LEO, which is consistent with the choices of General Stafford's Synthesis Group Report. A second-generation Dynamic Construction Activities Model ('DYCAM') process model has been under development, based on our past results in interruptability and our initial DYCAM model. This second-generation model is built on the paradigm of knowledge-based expert systems. It is aimed at providing answers to two questions: (1) what are some necessary or sufficient conditions for judging conceptual designs of spacecraft?, and (2) can a methodology be formulated such that these conditions may be used to provide computer-aided tools for evaluating conceptual designs and planning for space assembly sequences? Early simulation results indicate that the DYCAM model has a clear ability to emulate and simulate human orbital construction processes.
NASA Astrophysics Data System (ADS)
Spencer, Harvey
2002-09-01
Helicopter mounted optical systems require compact packaging, good image performance (approaching the diffraction-limit), and must survive and operate in a rugged shock and thermal environment. The always-present requirement for low weight in an airborne sensor is paramount when considering the optical configuration. In addition, the usual list of optical requirements which must be satisfied within narrow tolerances, including field-of-view, vignetting, boresight, stray light rejection, and transmittance drive the optical design. It must be determined early in the engineering process which internal optical alignment adjustment provisions must be included, which may be included, and which will have to be omitted, since adding alignment features often conflicts with the requirement for optical component stability during operation and of course adds weight. When the system is to be modular and mates with another optical system, a telescope designed by different contractor in this case, additional alignment requirements between the two systems must be specified and agreed upon. Final delivered cost is certainly critical and "touch labor" assembly time must be determined and controlled. A clear plan for the alignment and assembly steps must be devised before the optical design can even begin to ensure that an arrangement of optical components amenable to adjustment is reached. The optical specification document should be written contemporaneously with the alignment plan to insure compatibility. The optics decisions that led to the success of this project are described and the final optical design is presented. A description of some unique pupil alignment adjustments, never performed by us in the infrared, is described.
Space station automation study. Volume 1: Executive summary. Autonomous systems and assembly
NASA Technical Reports Server (NTRS)
1984-01-01
The space station automation study (SSAS) was to develop informed technical guidance for NASA personnel in the use of autonomy and autonomous systems to implement space station functions. The initial step taken by NASA in organizing the SSAS was to form and convene a panel of recognized expert technologists in automation, space sciences and aerospace engineering to produce a space station automation plan.
103. JOB NO. 1347F, SHEET 4, 1927/1929, ASSEMBLY BUILDING; FORD ...
103. JOB NO. 1347-F, SHEET 4, 1927/1929, ASSEMBLY BUILDING; FORD MOTOR COMPANY; ROOF PLAN CROSS SECTION AND DETAIL - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA
Overview of the NASA automation and robotics research program
NASA Technical Reports Server (NTRS)
Holcomb, Lee; Larsen, Ron
1985-01-01
NASA studies over the last eight years have identified five opportunities for the application of automation and robotics technology: (1) satellite servicing; (2) system monitoring, control, sequencing and diagnosis; (3) space manufacturing; (4) space structure assembly; and (5) planetary rovers. The development of these opportunities entails two technology R&D thrusts: telerobotics and system autonomy; both encompass such concerns as operator interface, task planning and reasoning, control execution, sensing, and systems integration.
Design and implementation of a compliant robot with force feedback and strategy planning software
NASA Technical Reports Server (NTRS)
Premack, T.; Strempek, F. M.; Solis, L. A.; Brodd, S. S.; Cutler, E. P.; Purves, L. R.
1984-01-01
Force-feedback robotics techniques are being developed for automated precision assembly and servicing of NASA space flight equipment. Design and implementation of a prototype robot which provides compliance and monitors forces is in progress. Computer software to specify assembly steps and makes force feedback adjustments during assembly are coded and tested for three generically different precision mating problems. A model program demonstrates that a suitably autonomous robot can plan its own strategy.
Shuttle payload minimum cost vibroacoustic tests
NASA Technical Reports Server (NTRS)
Stahle, C. V.; Gongloff, H. R.; Young, J. P.; Keegan, W. B.
1977-01-01
This paper is directed toward the development of the methodology needed to evaluate cost effective vibroacoustic test plans for Shuttle Spacelab payloads. Statistical decision theory is used to quantitatively evaluate seven alternate test plans by deriving optimum test levels and the expected cost for each multiple mission payload considered. The results indicate that minimum costs can vary by as much as $6 million for the various test plans. The lowest cost approach eliminates component testing and maintains flight vibration reliability by performing subassembly tests at a relatively high acoustic level. Test plans using system testing or combinations of component and assembly level testing are attractive alternatives. Component testing alone is shown not to be cost effective.
Tools and Equipment Modeling for Automobile Interactive Assembling Operating Simulation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wu Dianliang; Zhu Hongmin; Shanghai Key Laboratory of Advance Manufacturing Environment
Tools and equipment play an important role in the simulation of virtual assembly, especially in the assembly process simulation and plan. Because of variety in function and complexity in structure and manipulation, the simulation of tools and equipments remains to be a challenge for interactive assembly operation. Based on analysis of details and characteristics of interactive operations for automobile assembly, the functional requirement for tools and equipments of automobile assembly is given. Then, a unified modeling method for information expression and function realization of general tools and equipments is represented, and the handling methods of manual, semi-automatic, automatic tools andmore » equipments are discussed. Finally, the application in assembly simulation of rear suspension and front suspension of Roewe 750 automobile is given. The result shows that the modeling and handling methods are applicable in the interactive simulation of various tools and equipments, and can also be used for supporting assembly process planning in virtual environment.« less
SP-100 GES/NAT radiation shielding systems design and development testing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Disney, R.K.; Kulikowski, H.D.; McGinnis, C.A.
1991-01-10
Advanced Energy Systems (AES) of Westinghouse Electric Corporation is under subcontract to the General Electric Company to supply nuclear radiation shielding components for the SP-100 Ground Engineering System (GES) Nuclear Assembly Test to be conducted at Westinghouse Hanford Company at Richland, Washington. The radiation shielding components are integral to the Nuclear Assembly Test (NAT) assembly and include prototypic and non-prototypic radiation shielding components which provide prototypic test conditions for the SP-100 reactor subsystem and reactor control subsystem components during the GES/NAT operations. W-AES is designing three radiation shield components for the NAT assembly; a prototypic Generic Flight System (GFS) shield,more » the Lower Internal Facility Shield (LIFS), and the Upper Internal Facility Shield (UIFS). This paper describes the design approach and development testing to support the design, fabrication, and assembly of these three shield components for use within the vacuum vessel of the GES/NAT. The GES/NAT shields must be designed to operate in a high vacuum which simulates space operations. The GFS shield and LIFS must provide prototypic radiation/thermal environments and mechanical interfaces for reactor system components. The NAT shields, in combination with the test facility shielding, must provide adequate radiation attenuation for overall test operations. Special design considerations account for the ground test facility effects on the prototypic GFS shield. Validation of the GFS shield design and performance will be based on detailed Monte Carlo analyses and developmental testing of design features. Full scale prototype testing of the shield subsystems is not planned.« less
Scar-less multi-part DNA assembly design automation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hillson, Nathan J.
The present invention provides a method of a method of designing an implementation of a DNA assembly. In an exemplary embodiment, the method includes (1) receiving a list of DNA sequence fragments to be assembled together and an order in which to assemble the DNA sequence fragments, (2) designing DNA oligonucleotides (oligos) for each of the DNA sequence fragments, and (3) creating a plan for adding flanking homology sequences to each of the DNA oligos. In an exemplary embodiment, the method includes (1) receiving a list of DNA sequence fragments to be assembled together and an order in which tomore » assemble the DNA sequence fragments, (2) designing DNA oligonucleotides (oligos) for each of the DNA sequence fragments, and (3) creating a plan for adding optimized overhang sequences to each of the DNA oligos.« less
CPAS Preflight Drop Test Analysis Process
NASA Technical Reports Server (NTRS)
Englert, Megan E.; Bledsoe, Kristin J.; Romero, Leah M.
2015-01-01
Throughout the Capsule Parachute Assembly System (CPAS) drop test program, the CPAS Analysis Team has developed a simulation and analysis process to support drop test planning and execution. This process includes multiple phases focused on developing test simulations and communicating results to all groups involved in the drop test. CPAS Engineering Development Unit (EDU) series drop test planning begins with the development of a basic operational concept for each test. Trajectory simulation tools include the Flight Analysis and Simulation Tool (FAST) for single bodies, and the Automatic Dynamic Analysis of Mechanical Systems (ADAMS) simulation for the mated vehicle. Results are communicated to the team at the Test Configuration Review (TCR) and Test Readiness Review (TRR), as well as at Analysis Integrated Product Team (IPT) meetings in earlier and intermediate phases of the pre-test planning. The ability to plan and communicate efficiently with rapidly changing objectives and tight schedule constraints is a necessity for safe and successful drop tests.
Future aerospace ground test facility requirements for the Arnold Engineering Development Center
NASA Technical Reports Server (NTRS)
Kirchner, Mark E.; Baron, Judson R.; Bogdonoff, Seymour M.; Carter, Donald I.; Couch, Lana M.; Fanning, Arthur E.; Heiser, William H.; Koff, Bernard L.; Melnik, Robert E.; Mercer, Stephen C.
1992-01-01
Arnold Engineering Development Center (AEDC) was conceived at the close of World War II, when major new developments in flight technology were presaged by new aerodynamic and propulsion concepts. During the past 40 years, AEDC has played a significant part in the development of many aerospace systems. The original plans were extended through the years by some additional facilities, particularly in the area of propulsion testing. AEDC now has undertaken development of a master plan in an attempt to project requirements and to plan for ground test and computational facilities over the coming 20 to 30 years. This report was prepared in response to an AEDC request that the National Research Council (NRC) assemble a committee to prepare guidance for planning and modernizing AEDC facilities for the development and testing of future classes of aerospace systems as envisaged by the U.S. Air Force.
Hierarchical planning for a surface mounting machine placement.
Zeng, You-jiao; Ma, Deng-ze; Jin, Ye; Yan, Jun-qi
2004-11-01
For a surface mounting machine (SMM) in printed circuit board (PCB) assembly line, there are four problems, e.g. CAD data conversion, nozzle selection, feeder assignment and placement sequence determination. A hierarchical planning for them to maximize the throughput rate of an SMM is presented here. To minimize set-up time, a CAD data conversion system was first applied that could automatically generate the data for machine placement from CAD design data files. Then an effective nozzle selection approach implemented to minimize the time of nozzle changing. And then, to minimize picking time, an algorithm for feeder assignment was used to make picking multiple components simultaneously as much as possible. Finally, in order to shorten pick-and-place time, a heuristic algorithm was used to determine optimal component placement sequence according to the decided feeder positions. Experiments were conducted on a four head SMM. The experimental results were used to analyse the assembly line performance.
2012-07-02
CAPE CANAVERAL, Fla. – Dan Dumbacher, NASA deputy associate administrator for Exploration Systems Development, addresses the audience assembled in Kennedy Space Center's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. The capsule was shipped to Kennedy from NASA's Michoud Assembly Facility in New Orleans where the crew module pressure vessel was built. The Orion production team will prepare the module for flight at Kennedy by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
Pointing error analysis of Risley-prism-based beam steering system.
Zhou, Yuan; Lu, Yafei; Hei, Mo; Liu, Guangcan; Fan, Dapeng
2014-09-01
Based on the vector form Snell's law, ray tracing is performed to quantify the pointing errors of Risley-prism-based beam steering systems, induced by component errors, prism orientation errors, and assembly errors. Case examples are given to elucidate the pointing error distributions in the field of regard and evaluate the allowances of the error sources for a given pointing accuracy. It is found that the assembly errors of the second prism will result in more remarkable pointing errors in contrast with the first one. The pointing errors induced by prism tilt depend on the tilt direction. The allowances of bearing tilt and prism tilt are almost identical if the same pointing accuracy is planned. All conclusions can provide a theoretical foundation for practical works.
Space Assembly of Large Structural System Architectures (SALSSA)
NASA Technical Reports Server (NTRS)
Dorsey, John T.; Watson, Judith J.
2016-01-01
Developing a robust capability for Space Assembly of Large Spacecraft Structural System Architectures (SALSSA) has the potential to drastically increase the capabilities and performance of future space missions and spacecraft while significantly reducing their cost. Currently, NASA architecture studies and space science decadal surveys identify new missions that would benefit from SALSSA capabilities, and the technologies that support SALSSA are interspersed throughout the fourteen NASA Technology Roadmaps. However, a major impediment to the strategic development of cross-cutting SALSSA technologies is the lack of an integrated and comprehensive compilation of the necessary information. This paper summarizes the results of a small study that used an integrated approach to formulate a SALSSA roadmap and associated plan for developing key SALSSA technologies.
The use of interactive computer vision and robot hand controllers for enhancing manufacturing safety
NASA Technical Reports Server (NTRS)
Marzwell, Neville I.; Jacobus, Charles J.; Peurach, Thomas M.; Mitchell, Brian T.
1994-01-01
Current available robotic systems provide limited support for CAD-based model-driven visualization, sensing algorithm development and integration, and automated graphical planning systems. This paper describes ongoing work which provides the functionality necessary to apply advanced robotics to automated manufacturing and assembly operations. An interface has been built which incorporates 6-DOF tactile manipulation, displays for three dimensional graphical models, and automated tracking functions which depend on automated machine vision. A set of tools for single and multiple focal plane sensor image processing and understanding has been demonstrated which utilizes object recognition models. The resulting tool will enable sensing and planning from computationally simple graphical objects. A synergistic interplay between human and operator vision is created from programmable feedback received from the controller. This approach can be used as the basis for implementing enhanced safety in automated robotics manufacturing, assembly, repair and inspection tasks in both ground and space applications. Thus, an interactive capability has been developed to match the modeled environment to the real task environment for safe and predictable task execution.
The use of interactive computer vision and robot hand controllers for enhancing manufacturing safety
NASA Astrophysics Data System (ADS)
Marzwell, Neville I.; Jacobus, Charles J.; Peurach, Thomas M.; Mitchell, Brian T.
1994-02-01
Current available robotic systems provide limited support for CAD-based model-driven visualization, sensing algorithm development and integration, and automated graphical planning systems. This paper describes ongoing work which provides the functionality necessary to apply advanced robotics to automated manufacturing and assembly operations. An interface has been built which incorporates 6-DOF tactile manipulation, displays for three dimensional graphical models, and automated tracking functions which depend on automated machine vision. A set of tools for single and multiple focal plane sensor image processing and understanding has been demonstrated which utilizes object recognition models. The resulting tool will enable sensing and planning from computationally simple graphical objects. A synergistic interplay between human and operator vision is created from programmable feedback received from the controller. This approach can be used as the basis for implementing enhanced safety in automated robotics manufacturing, assembly, repair and inspection tasks in both ground and space applications. Thus, an interactive capability has been developed to match the modeled environment to the real task environment for safe and predictable task execution.
Strategic planning for aircraft noise route impact analysis: A three dimensional approach
NASA Technical Reports Server (NTRS)
Bragdon, C. R.; Rowan, M. J.; Ahuja, K. K.
1993-01-01
The strategic routing of aircraft through navigable and controlled airspace to minimize adverse noise impact over sensitive areas is critical in the proper management and planning of the U.S. based airport system. A major objective of this phase of research is to identify, inventory, characterize, and analyze the various environmental, land planning, and regulatory data bases, along with potential three dimensional software and hardware systems that can be potentially applied for an impact assessment of any existing or planned air route. There are eight data bases that have to be assembled and developed in order to develop three dimensional aircraft route impact methodology. These data bases which cover geographical information systems, sound metrics, land use, airspace operational control measures, federal regulations and advisories, census data, and environmental attributes have been examined and aggregated. A three dimensional format is necessary for planning, analyzing space and possible noise impact, and formulating potential resolutions. The need to develop this three dimensional approach is essential due to the finite capacity of airspace for managing and planning a route system, including airport facilities. It appears that these data bases can be integrated effectively into a strategic aircraft noise routing system which should be developed as soon as possible, as part of a proactive plan applied to our FAA controlled navigable airspace for the United States.
A space crane concept for performing on-orbit assembly
NASA Technical Reports Server (NTRS)
Dorsey, John T.
1992-01-01
The topics are presented in viewgraph form and include: in-space assembly and construction enhances future mission planning flexibility; in-space assembly and construction facility concept; space crane concept with mobile base; fundamental characteristics; space crane research approach; spacecraft component positioning and assembly test-bed; and articulating joint testbed.
Solar Stirling power generation - Systems analysis and preliminary tests
NASA Technical Reports Server (NTRS)
Selcuk, M. K.; Wu, Y.-C.; Moynihan, P. I.; Day, F. D., III
1977-01-01
The feasibility of an electric power generation system utilizing a sun-tracking parabolic concentrator and a Stirling engine/linear alternator is being evaluated. Performance predictions and cost analysis of a proposed large distributed system are discussed. Design details and preliminary test results are presented for a 9.5 ft diameter parabolic dish at the Jet Propulsion Laboratory (Caltech) Table Mountain Test Facility. Low temperature calorimetric measurements were conducted to evaluate the concentrator performance, and a helium flow system is being used to test the solar receiver at anticipated working fluid temperatures (up to 650 or 1200 C) to evaluate the receiver thermal performance. The receiver body is designed to adapt to a free-piston Stirling engine which powers a linear alternator assembly for direct electric power generation. During the next phase of the program, experiments with an engine and receiver integrated into the concentrator assembly are planned.
NASA Astrophysics Data System (ADS)
Kaemingk, Michael; Cooper, Robert; Coherent Collaboration
2016-09-01
COHERENT is a collaboration whose goal is to measure coherent elastic neutrino-nucleus scattering (CEvNS). COHERENT plans to deploy a suite of detectors to measure the expected number-of-neutrons squared dependence of CEvNS at the Spallation Neutron Source at Oak Ridge National Laboratory. One of these detectors is a liquid argon detector which can measure these low energy nuclear recoil interactions. Ensuring optimal functionality requires the development of a slow control system to monitor and control various aspects, such as the temperature and pressure, of these detectors. Electronics manufactured by Beckhoff, Digilent, and Arduino among others are being used to create these slow control systems. This poster will generally discuss the assembly and commissioning of this CENNS-10 liquid argon detector at Indiana University and will feature work on the slow control systems.
Space-based solar power conversion and delivery systems study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Hazelrigg, G. A., Jr.
1976-01-01
The technical and economic aspects of satellite solar power systems are presented with a focus on the current configuration 5000 MW system. The technical studies include analyses of the orbital system structures, control and stationkeeping, and the formulation of program plans and costs for input to the economic analyses. The economic analyses centered about the development and use of a risk analysis model for a system cost assessment, identification of critical issues and technologies, and to provide information for programmatic decision making. A preliminary economic examination of some utility interface issues is included. Under the present state-of-knowledge, it is possible to formulate a program plan for the development of a satellite solar power system that can be economically justified. The key area of technological uncertainty is man's ability to fabricate and assemble large structures in space.
Space Congress, 29th, Cocoa Beach, FL, Apr. 21-24, 1992, Proceedings
NASA Technical Reports Server (NTRS)
1992-01-01
The present volume on the quest for new frontiers in space discusses weather impacts on space operations, planning for the performance of future space bases, a new guidance and control unit for the Titan IV vehicle, and nondestructive evaluation of Shuttle Columbia tiles. Attention is given to Space Shuttle payload accommodations and trends in customer demands, a generic propellants transfer unit, making space part of general education, space station on-orbit solar array loads during assembly, and dimensional stability of the attitude reference assembly on SSF. Topics addressed include National Launch System payload accommodations and launch operations, the integrated factory/launch site processing concept, Pioneer 10 interstellar studies, and the role of advanced nuclear propulsion systems in precursor interstellar missions. Also discussed are legal challenges in realizing interstellar initiatives, Mars transportation system synthesis, and NASA's commercial space program.
Treatment planning capability assessment of a beam shaping assembly for accelerator-based BNCT.
Herrera, M S; González, S J; Burlon, A A; Minsky, D M; Kreiner, A J
2011-12-01
Within the frame of an ongoing project to develop a folded Tandem-Electrostatic-Quadrupole accelerator facility for Accelerator-Based Boron Neutron Capture Therapy (AB-BNCT) a theoretical study was performed to assess the treatment planning capability of different configurations of an optimized beam shaping assembly for such a facility. In particular this study aims at evaluating treatment plans for a clinical case of Glioblastoma. Copyright © 2011 Elsevier Ltd. All rights reserved.
DFL, Canada's Space AIT Facilities - Current and Planned Capabilities
NASA Astrophysics Data System (ADS)
Singhal, R.; Mishra, S.; Choueiry, E.; Dumoulin, J.; Ahmed, S.
2004-08-01
The David Florida Laboratory (DFL) of the Canadian Space Agency is the Canadian national ISO 9001:2000 registered facility for the assembly, integration, and (environmental) testing of space hardware. This paper briefly describes the three main qualification facilities: Structural Qualification Facilities (SQF); Radio Frequency Qualification Facilities (RFQF); and Thermal Qualification Facilities (TQF). The paper also describes the planned/new upgrades/improvements to the DFL's existing capabilities. These include: cylindrical near-field antenna measurement system, current capabilities in multi-frequency multi-band passive intermodulation (PIM) measurement; combined thermal/vibration test facility, improvement in efficiency and performance of the photogrammetry capability, acquisition of an additional mass properties measurement system for small and micro-satellites; combined control and data acquisition system for all existing thermal vacuum facilities, plus a new automatic thermal control system and hypobaric chamber.
Simulation of textile manufacturing processes for planning, scheduling, and quality control purposes
NASA Astrophysics Data System (ADS)
Cropper, A. E.; Wang, Z.
1995-08-01
Simulation, as a management information tool, has been applied to engineering manufacture and assembly operations. The application of the principles to textile manufacturing (fiber to fabric) is discussed. The particular problems and solutions in applying the simulation software package to the yarn production processes are discussed with an indication of how the software achieves the production schedule. The system appears to have application in planning, scheduling, and quality assurance. The latter being a result of the traceability possibilities through a process involving mixing and splitting of material.
114. JOB NO. 1347K, SHEET 1M, 1929, FORD MOTOR COMPANY; ...
114. JOB NO. 1347-K, SHEET 1M, 1929, FORD MOTOR COMPANY; BOILER HOUSE ASSEMBLY PLANT; PLAN - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA
2012-07-02
CAPE CANAVERAL, Fla. – David Beaman, NASA Space Launch System spacecraft and payload integration manager, addresses the audience assembled in Kennedy Space Center's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. The capsule was shipped to Kennedy from NASA's Michoud Assembly Facility in New Orleans where the crew module pressure vessel was built. The Orion production team will prepare the module for flight at Kennedy by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2012-07-02
CAPE CANAVERAL, Fla. – John Karas, vice president and general manager of Human Spaceflight for Lockheed Martin Space Systems, addresses the audience assembled in Kennedy Space Center's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. The capsule was shipped to Kennedy from NASA's Michoud Assembly Facility in New Orleans where the crew module pressure vessel was built. The Orion production team will prepare the module for flight at Kennedy by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2012-07-02
CAPE CANAVERAL, Fla. – Pepper Phillips, program manager for NASA's Ground Systems Development and Operations, addresses the audience assembled in Kennedy Space Center's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. The capsule was shipped to Kennedy from NASA's Michoud Assembly Facility in New Orleans where the crew module pressure vessel was built. The Orion production team will prepare the module for flight at Kennedy by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
Clinical Note Creation, Binning, and Artificial Intelligence
Deliberato, Rodrigo Octávio; Stone, David J
2017-01-01
The creation of medical notes in software applications poses an intrinsic problem in workflow as the technology inherently intervenes in the processes of collecting and assembling information, as well as the production of a data-driven note that meets both individual and healthcare system requirements. In addition, the note writing applications in currently available electronic health records (EHRs) do not function to support decision making to any substantial degree. We suggest that artificial intelligence (AI) could be utilized to facilitate the workflows of the data collection and assembly processes, as well as to support the development of personalized, yet data-driven assessments and plans. PMID:28778845
International Space Station Major Constituent Analyzer On-orbit Performance
NASA Technical Reports Server (NTRS)
Gardner, Ben D.; Erwin, Phillip M.; Wiedemann, Rachel; Matty, Chris
2016-01-01
The Major Constituent Analyzer (MCA) is a mass spectrometer based system that measures the major atmospheric constituents on the International Space Station. A number of limited-life components require periodic change-out, including the ORU 02 analyzer and the ORU 08 Verification Gas Assembly. The most recent ORU 02 and ORU 08 assemblies are operating nominally. For ORU 02, the ion source filaments and ion pump lifetime continue to be key determinants of MCA performance. Additionally, testing is underway to evaluate the capacity of the MCA to analyze ammonia. Finally, plans are being made to bring the second MCA on ISS to an operational configuration.
Seeking consensus for cyberinfrastructure governance in the USA
NASA Astrophysics Data System (ADS)
Allison, M. Lee; Zanzkerkia, Eva
2014-05-01
Governance of geosciences cyberinfrastructure is a complex and essential undertaking, critical in enabling distributed knowledge communities to collaborate and communicate across disciplines, distances, and cultures. Advancing science with respect to "grand challenges," such as global change, Earth system observation, modeling, and prediction, and core fundamental science, depends not just on technical cyber systems, but also on social systems for strategic planning, decision-making, project management, learning, teaching, and building a community of practice. Simply put, a robust, agile technical system depends on an equally robust and adaptable social system. Cyberinfrastructure development is wrapped in social, organizational and governance challenges which may significantly impede technical progress and result in inefficiencies, duplication of effort, incompatibilities, wasted resources or user frustration. These issues are also the most time consuming to resolve due to significant institutional and social inertia: hence the urgency for developing a governance blueprint. An agile development process is underway for governance of transformative investments in geosciences cyberinfrastructure through the US National Science Foundation's EarthCube Program. Agile development is iterative and incremental, and promotes adaptive planning and rapid and flexible response. Such iterative deployment across a variety of EarthCube stakeholders encourages transparency, consensus, accountability, and inclusiveness. A broad coalition of stakeholder groups comprises an Assembly to serve as a preliminary venue for identifying, evaluating, and testing potential governance models. To offer opportunity for ensure broader end-user input and buy-in, a crowd-source approach engages stakeholders not involved otherwise in the Assembly. Developmental evaluators from the social sciences embedded in the project will provide real-time review and adjustments. In order to ensure an open and inclusive process, community-selected leaders play key roles through an Assembly Advisory Council. If consensus is reached on a governing framework, a community-selected demonstration governance demonstration pilot will help facilitate community convergence on system design.
A&M. TAN607 second floor plan for cold assembly area. Metallurgical ...
A&M. TAN-607 second floor plan for cold assembly area. Metallurgical lab, chemistry lab, nuclear instrument lab, equipment rooms. Ralph M. Parsons 902-ANP-607-A 102. Date: December 1952. Approved by INEEL Classification Office for public release. INEEL index code no. 034-0607-693-106754 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
Fabrication Control Plan for ORNL RH-LOCA ATF Test Specimens to be Irradiated in the ATR
DOE Office of Scientific and Technical Information (OSTI.GOV)
Field, Kevin G.; Howard, Richard; Teague, Michael
2014-06-01
The purpose of this fabrication plan is (1) to summarize the design of a set of rodlets that will be fabricated and then irradiated in the Advanced Test Reactor (ATR) and (2) provide requirements for fabrication and acceptance criteria for inspections of the Light Water Reactor (LWR) – Accident Tolerant Fuels (ATF) rodlet components. The functional and operational (F&OR) requirements for the ATF program are identified in the ATF Test Plan. The scope of this document only covers fabrication and inspections of rodlet components detailed in drawings 604496 and 604497. It does not cover the assembly of these items tomore » form a completed test irradiation assembly or the inspection of the final assembly, which will be included in a separate INL final test assembly specification/inspection document. The controls support the requirements that the test irradiations must be performed safely and that subsequent examinations must provide valid results.« less
Velasquez, German
2014-08-01
The negotiations of the intergovernmental group known as the 'IGWG', undertaken by the Member States of the WHO, were the result of a deadlock in the World Health Assembly held in 2006 where the Member States of the WHO were unable to reach an agreement on what to do with the 60 recommendations in the report on 'Public Health, Innovation and Intellectual Property Rights submitted to the Assembly in the same year by a group of experts designated by the Director General of the WHO. The result of these negotiations was the 'Global strategy and plan of action on public health, innovation and intellectual property' which was approved by the World Health Assembly in 2008. The intention of the Global Strategy and Plan of Action (GSPOA) which was produced by the IGWG was to substantially reform the pharmaceuticals' research and development system in view of the findings that this system, whose purpose is to produce medicines for diseases which affect the greater part of the world population which lives in developing countries, had failed. The intellectual property rights imposed by the Agreement on Trade-Related Aspects of Intellectual Property Rights (TRIPS) and the recent trade agreements could become one of the main obstacles to access to medicines. The GSPOA makes a critical analysis of this reality, and opens the door to searching for new solutions to this problem. © 2014 John Wiley & Sons Ltd.
The IAU Division A Working Group on the Third Realization of the ICRF: Background, Goals, Plans
NASA Astrophysics Data System (ADS)
Gaume, Ralph
2015-08-01
The XXVIII General Assembly of the IAU (Beijing, 2012) established the Division A Working Group on the Third Realization of the International Celestial Reference Frame (ICRF). The adopted charter of the ICRF3 Working Group includes a commitment to report on the implementation and execution plans for ICRF3 during the XXIX General Assembly of the IAU along with a targeted completion and presentation of ICRF3 in 2018 to the XXX General Assembly for adoption. This talk will discuss the background, purpose, and overall implementation plan for ICRF3, and motivate the concept, currently under consideration by the ICRF3 Working Group, that future realizations of the ICRF be based on multi-frequency astrometric data, starting with ICRF3.
Photovoltaic power systems workshop
NASA Technical Reports Server (NTRS)
Killian, H. J.; Given, R. W.
1978-01-01
Discussions are presented on apparent deficiencies in NASA planning and technology development relating to a standard power module (25-35 kW) and to future photovoltaic power systems in general. Topics of discussion consider the following: (1) adequate studies on power systems; (2) whether a standard power system module should be developed from a standard spacecraft; (3) identification of proper approaches to cost reduction; (4) energy storage avoidance; (5) attitude control; (6) thermal effects of heat rejection on solar array configuration stability; (7) assembly of large power systems in space; and (8) factoring terrestrial photovoltaic work into space power systems for possible payoff.
Shuttle/Agena study. Volume 2, part 3: Preliminary test plans
NASA Technical Reports Server (NTRS)
1972-01-01
Proposed testing for the Agena tug program is based upon best estimates of shuttle and Agena tug requirements and upon the Agena configuration currently envisioned to meet these requirements. The proposed tests are presented in development, qualification, system, and launch base test plans. These plans are based upon generalized requirements and assumed situations. The limitations of this study precluded all but minimal consideration of related shuttle orbiter and shuttle ground systems. The test plans include provisions for all testing from major component to systems level, identified as necessary to aid in confirmation of the modified Agena configuration for the space tug; considerations that crew safety requirements and new environmental conditions from shuttle interface effects do impose some new Agena testing requirements; considerations that many existing Agena flight-qualified components will be utilized and qualification testing will be minimal; testing not only for the Agena tug but also for new or modified items of handling or servicing equipment for supporting the Agena factory-to-launch sequence; and the assembly of required testing into a sequence-ordered series of events.
NASA Astrophysics Data System (ADS)
The U.S. Integrated Ocean Observing System (IOOS) is encouraging public comment on the draft plan for its Data Management and Communications (DMAC∥ component. The deadline for receipt of comments has been extended to 18 November 2003. The plan can be found at http://www.dmac.ocean.us/dacsc/imp_plan.jsp. The plan was developed by the DMAC Steering Committee, which includes representatives from federal and state agencies, private industry, and academia. This committee was tasked by Ocean.US (the national office for IOOS) with the preparation of a detailed, phased DMAC implementation plan, and initial oversight of its implementation. The scope of the plan includes the IOOS DMAC infrastructure, data archive and access, and basic information products needed for assessing the availability and quality of data within IOOS. Four expert teams (Data Transport, Metadata and Data Discovery, Data Archive and Access, Applications and Products), and two outreach teams (Data Facilities Management, and User Outreach), were assembled to assist in developing material for the plan.
VCE testbed program planning and definition study
NASA Technical Reports Server (NTRS)
Westmoreland, J. S.; Godston, J.
1978-01-01
The flight definition of the Variable Stream Control Engine (VSCE) was updated to reflect design improvements in the two key components: (1) the low emissions duct burner, and (2) the coannular exhaust nozzle. The testbed design was defined and plans for the overall program were formulated. The effect of these improvements was evaluated for performance, emissions, noise, weight, and length. For experimental large scale testing of the duct burner and coannular nozzle, a design definition of the VCE testbed configuration was made. This included selecting the core engine, determining instrumentation requirements, and selecting the test facilities, in addition to defining control system and assembly requirements. Plans for a comprehensive test program to demonstrate the duct burner and nozzle technologies were formulated. The plans include both aeroacoustic and emissions testing.
Solving Assembly Sequence Planning using Angle Modulated Simulated Kalman Filter
NASA Astrophysics Data System (ADS)
Mustapa, Ainizar; Yusof, Zulkifli Md.; Adam, Asrul; Muhammad, Badaruddin; Ibrahim, Zuwairie
2018-03-01
This paper presents an implementation of Simulated Kalman Filter (SKF) algorithm for optimizing an Assembly Sequence Planning (ASP) problem. The SKF search strategy contains three simple steps; predict-measure-estimate. The main objective of the ASP is to determine the sequence of component installation to shorten assembly time or save assembly costs. Initially, permutation sequence is generated to represent each agent. Each agent is then subjected to a precedence matrix constraint to produce feasible assembly sequence. Next, the Angle Modulated SKF (AMSKF) is proposed for solving ASP problem. The main idea of the angle modulated approach in solving combinatorial optimization problem is to use a function, g(x), to create a continuous signal. The performance of the proposed AMSKF is compared against previous works in solving ASP by applying BGSA, BPSO, and MSPSO. Using a case study of ASP, the results show that AMSKF outperformed all the algorithms in obtaining the best solution.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dawson, D.M.; Guerra, G.; Neider, T.
1995-12-01
This report describes the system developed by EPRI/DOE for the dry transfer of spent fuel assemblies outside the reactor spent fuel pool. The system is designed to allow spent fuel assemblies to be removed from a spent fuel pool in a small cask, transported to the transfer facility, and transferred to a larger cask, either for off-site transportation or on-site storage. With design modifications, this design is capable of transferring single spent fuel assemblies from dry storage casks to transportation casks or visa versa. One incentive for the development of this design is that utilities with limited lifting capacity ormore » other physical or regulatory constraints are limited in their ability to utilize the current, more efficient transportation and storage cask designs. In addition, DOE, in planning to develop and implement the multi-purpose canister (MPC) system for the Civilian Radioactive Waste Management System, included the concept of an on-site dry transfer system to support the implementation of the MPC system at reactors with limitations that preclude the handling of the MPC system transfer casks. This Dry Transfer System can also be used at reactors wi decommissioned spent fuel pools and fuel in dry storage in non-MPC systems to transfer fuel into transportation casks. It can also be used at off-reactor site interim storage facilities for the same purpose.« less
ERIC Educational Resources Information Center
Kentucky Council on Postsecondary Education, 2016
2016-01-01
In 1997, the General Assembly adopted the "Postsecondary Education Improvement Act of 1997" (HB 1), a bold and visionary act to reform Kentucky's public system of higher education. This piece of legislation established broad goals for increasing educational attainment at all levels, and charged the Kentucky Council on Postsecondary…
TACOM LCMC Industrial Base Networking Summit
2010-03-25
CAD/CAM CNC Programming •Quick reaction of parts - CNC , Lathes , Mills, Water Jet/Laser Cutting Design •Mechanical, Electrical, Electronics...system that can efficiently fabricate standard and unique parts at the point of need • Lathe modules deployed at 4 strategic SWA locations • Concepts...Prototype Integration Planning Machining / CNC / Metals Welding Assembly / Paint Integration •Field-Experienced Veterans •Component, Subsystems
Drilling and production aspects of horizontal wells in the Austin Chalk
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sheikholeslami, B.A.; Scholhman, B.W.; Seidel, F.A.
1991-07-01
This paper discusses testing of horizontal technology for use in the highly fractured Giddings oil field. Three short-and seven medium-radius wells were drilled successfully in the Austin Chalk formation. The paper discusses well plans, bottomhole assemblies, trajectory control, telemetry, mud systems, hydraulics, hole cleaning, casing design, cementing, problems encountered, formation evaluation, completions, and reservoir response.
NOAA Ecosystem Data Assembly Center for the Gulf of Mexico
NASA Astrophysics Data System (ADS)
Parsons, A. R.; Beard, R. H.; Arnone, R. A.; Cross, S. L.; Comar, P. G.; May, N.; Strange, T. P.
2006-12-01
Through research programs at the NOAA Northern Gulf of Mexico Cooperative Institute (CI), NOAA is establishing an Ecosystem Data Assembly Center (EDAC) for the Gulf of Mexico. The EDAC demonstrates the utility of integrating many heterogeneous data types and streams used to characterized and identify ecosystems for the purpose of determining the health of ecosystems and identifying applications of the data within coastal resource management activities. Data streams include meteorological, physical oceanographic, ocean color, benthic, biogeochemical surveys, fishery, as well as fresh water fluxes (rainfall and river flow). Additionally the EDAC will provide an interface to the ecosystem data through an ontology based on the Coastal/Marine Ecological Classification System (CMECS). Applications of the ontological approach within the EDAC will be applied to increase public knowledge on habitat and ecosystem awareness. The EDAC plans to leverage companion socioeconomic studies to identify the essential data needed for continued EDAC operations. All data-management architectures and practices within the EDAC ensure interoperability with the Integrated Ocean Observing System (IOOS) national backbone by incorporating the IOOS Data Management and Communications Plan. Proven data protocols, standards, formats, applications, practices and architectures developed by the EDAC will be transitioned to the NOAA National Data Centers.
Planning the FUSE Mission Using the SOVA Algorithm
NASA Technical Reports Server (NTRS)
Lanzi, James; Heatwole, Scott; Ward, Philip R.; Civeit, Thomas; Calvani, Humberto; Kruk, Jeffrey W.; Suchkov, Anatoly
2011-01-01
Three documents discuss the Sustainable Objective Valuation and Attainability (SOVA) algorithm and software as used to plan tasks (principally, scientific observations and associated maneuvers) for the Far Ultraviolet Spectroscopic Explorer (FUSE) satellite. SOVA is a means of managing risk in a complex system, based on a concept of computing the expected return value of a candidate ordered set of tasks as a product of pre-assigned task values and assessments of attainability made against qualitatively defined strategic objectives. For the FUSE mission, SOVA autonomously assembles a week-long schedule of target observations and associated maneuvers so as to maximize the expected scientific return value while keeping the satellite stable, managing the angular momentum of spacecraft attitude- control reaction wheels, and striving for other strategic objectives. A six-degree-of-freedom model of the spacecraft is used in simulating the tasks, and the attainability of a task is calculated at each step by use of strategic objectives as defined by use of fuzzy inference systems. SOVA utilizes a variant of a graph-search algorithm known as the A* search algorithm to assemble the tasks into a week-long target schedule, using the expected scientific return value to guide the search.
Changes in Quality of Health Care Delivery after Vertical Integration.
Carlin, Caroline S; Dowd, Bryan; Feldman, Roger
2015-08-01
To fill an empirical gap in the literature by examining changes in quality of care measures occurring when multispecialty clinic systems were acquired by hospital-owned, vertically integrated health care delivery systems in the Twin Cities area. Administrative data for health plan enrollees attributed to treatment and control clinic systems, merged with U.S. Census data. We compared changes in quality measures for health plan enrollees in the acquired clinics to enrollees in nine control groups using a differences-in-differences model. Our dataset spans 2 years prior to and 4 years after the acquisitions. We estimated probit models with errors clustered within enrollees. Data were assembled by the health plan's informatics team. Vertical integration is associated with increased rates of colorectal and cervical cancer screening and more appropriate emergency department use. The probability of ambulatory care-sensitive admissions increased when the acquisition caused disruption in admitting patterns. Moving a clinic system into a vertically integrated delivery system resulted in limited increases in quality of care indicators. Caution is warranted when the acquisition causes disruption in referral patterns. © Health Research and Educational Trust.
Assembly jig assures reliable solar cell modules
NASA Technical Reports Server (NTRS)
Ofarrell, H. O.
1966-01-01
Assembly jig holds the components for a solar cell module in place as the assembly is soldered and bonded by the even heat of an oven. The jig is designed to the configuration of the planned module. It eliminates uneven thermal conditions caused by hand soldering methods.
International Space Station Research Plan, Assembly Sequence Rev., F
2000-08-01
muscles ü Higher risk for bone fracture upon return to Earth ü Potential for “slipped discs” ü Diminished ability to quickly respond to emergencies...Office of Biological and Physical Research International Space Station Research Plan Assembly Sequence Rev. F, Aug. 2000l . , . Report...Organization Name(s) and Address(es) NASA, Office of Biological and Physical Research Performing Organization Report Number Sponsoring/Monitoring Agency
GIS and Geodatabase Disaster Risk for Spatial Planning
NASA Astrophysics Data System (ADS)
Hendriawan Nur, Wawan; Kumoro, Yugo; Susilowati, Yuliana
2018-02-01
The spatial planning in Indonesia needs to consider the information on the potential disaster. That is because disaster is a serious and detrimental problem that often occurs and causes casualties in some areas in Indonesia as well as inhibits the development. Various models and research were developed to calculate disaster risk assessment. GIS is a system for assembling, storing, analyzing, and displaying geographically referenced disaster. The information can be collaborated with geodatabases to model and to estimate disaster risk in an automated way. It also offers the possibility to customize most of the parameters used in the models. This paper describes a framework which can improve GIS and Geodatabase for the vulnerability, capacity or disaster risk assessment to support the spatial planning activities so they can be more adaptable. By using this framework, GIS application can be used in any location by adjusting variables or calculation methods without changing or rebuilding system from scratch.
2010-01-12
CAPE CANAVERAL, Fla. - In the Remote Manipulator System Lab inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Atlantis' orbiter boom sensor system, or OBSS, awaits inspection. The 50-foot-long OBSS attaches to the end of the shuttle’s robotic arm and supports the cameras and laser systems used to inspect the shuttle’s thermal protection system while in space. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. Launch is targeted for May 14, 2010. Photo credit: NASA/Jack Pfaller
2010-01-12
CAPE CANAVERAL, Fla. - In the Remote Manipulator System Lab inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Atlantis' orbiter boom sensor system, or OBSS, is prepared for maintenance. The 50-foot-long OBSS attaches to the end of the shuttle’s robotic arm and supports the cameras and laser systems used to inspect the shuttle’s thermal protection system while in space. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. Launch is targeted for May 14, 2010. Photo credit: NASA/Jack Pfaller
Flight Hydrogen Sensor for use in the ISS Oxygen Generation Assembly
NASA Technical Reports Server (NTRS)
MSadoques, George, Jr.; Makel, Darby B.
2005-01-01
This paper provides a description of the hydrogen sensor Orbital Replacement Unit (ORU) used on the Oxygen Generation Assembly (OGA), to be operated on the International Space Station (ISS). The hydrogen sensor ORU is being provided by Makel Engineering, Inc. (MEI) to monitor the oxygen outlet for the presence of hydrogen. The hydrogen sensor ORU is a triple redundant design where each sensor converts raw measurements to actual hydrogen partial pressure that is reported to the OGA system controller. The signal outputs are utilized for system shutdown in the event that the hydrogen concentration in the oxygen outlet line exceeds the specified shutdown limit. Improvements have been made to the Micro-Electro-Mechanical Systems (MEMS) based sensing element, screening, and calibration process to meet OGA operating requirements. Two flight hydrogen sensor ORUs have successfully completed the acceptance test phase. This paper also describes the sensor s performance during acceptance testing, additional tests planned to extend the operational performance calibration cycle, and integration with the OGA system.
2010-01-12
CAPE CANAVERAL, Fla. - In the Remote Manipulator System Lab inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, this close-up shows the forward transition and X-guide restraint of the inspection boom assembly, or IBA, on space shuttle Atlantis' orbiter boom sensor system, or OBSS. The IBA is removed from the shuttle every other processing flow for a detailed inspection. After five consecutive flights, all IBA internal components are submitted to a thorough electrical checkout in the lab. The 50-foot-long OBSS attaches to the end of the shuttle’s robotic arm and supports the cameras and laser systems used to inspect the shuttle’s thermal protection system while in space. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. Launch is targeted for May 14, 2010. Photo credit: NASA/Jack Pfaller
Study of shuttle imaging microwave system antenna. Volume 1: Conceptual design
NASA Technical Reports Server (NTRS)
Wesley, R. W.; Waineo, D. K.; Barton, C. R.; Love, A. W.
1975-01-01
A detailed preliminary design and complete performance evaluation are presented of an 11-channel large aperture scanning radiometer antenna for the shuttle imaging microwave system (SIMS) program. Provisions for interfacing the antenna with the space shuttle orbiter are presented and discussed. A program plan for hardware development and a rough order of magnitude (ROM) cost are also included. The conceptual design of the antenna is presented. It consists of a four-meter diameter parabolic torus main reflector, which is a graphite/epoxy shell supported by a graphite/epoxy truss. A rotating feed wheel assembly supports six Gregorian subreflectors covering the upper eight frequency channels from 6.6 GHz through 118.7 GHz, and two three-channel prime forms feed assemblies for 0.6, 1.4, and 2.7 GHz. The feed wheel assembly also holds the radiometers and power supplies, and a drive system using a 400 Hz synchronous motor is described. The RF analysis of the antenna is performed using physical optics procedures for both the dual reflector Gregorian concept and the single reflector prime focus concept. A unique aberration correcting feed for 2.7 GHz is analyzed. A structural analysis is also included. The analyses indicate that the antenna will meet system requirements.
The high voltage homopolar generator
NASA Astrophysics Data System (ADS)
Price, J. H.; Gully, J. H.; Driga, M. D.
1986-11-01
System and component design features of proposed high voltage homopolar generator (HVHPG) are described. The system is to have an open circuit voltage of 500 V, a peak output current of 500 kA, 3.25 MJ of stored inertial energy and possess an average magnetic-flux density of 5 T. Stator assembly components are discussed, including the stator, mount structure, hydrostatic bearings, main and motoring brushgears and rotor. Planned operational procedures such as monitoring the rotor to full speed and operation with a superconducting field coil are delineated.
Path planning algorithms for assembly sequence planning. [in robot kinematics
NASA Technical Reports Server (NTRS)
Krishnan, S. S.; Sanderson, Arthur C.
1991-01-01
Planning for manipulation in complex environments often requires reasoning about the geometric and mechanical constraints which are posed by the task. In planning assembly operations, the automatic generation of operations sequences depends on the geometric feasibility of paths which permit parts to be joined into subassemblies. Feasible locations and collision-free paths must be present for part motions, robot and grasping motions, and fixtures. This paper describes an approach to reasoning about the feasibility of straight-line paths among three-dimensional polyhedral parts using an algebra of polyhedral cones. A second method recasts the feasibility conditions as constraints in a nonlinear optimization framework. Both algorithms have been implemented and results are presented.
Polio Eradication and Endgame Plan - Victory within Grasp.
Patel, Manish; Menning, Lisa; Bhatnagar, Pankaj
2016-08-07
Since the launch of the Global Polio Eradication Initiative (GPEI) by the World Health Assembly (WHA) in 1988, the number of polio-endemic countries has decreased from 125 to 2 (Afghanistan and Pakistan). To secure the gains and to address the remaining challenges, the GPEI developed the Polio Eradication and Endgame Strategic Plan, 2013-2018 (the Plan), endorsed by all Member States at the WHA in May 2013. One of the major elements that distinguishes this Plan from previous GPEI strategies is the approach to ending all polioviruses, both wild and vaccine-derived. Overall, the Plan outlines four main objectives: (1) to stop all wild poliovirus (WPV) transmission; (2) to introduce inactivated polio vaccine (IPV), withdraw all oral polio vaccines (OPV), and strengthen immunization systems in countries with weak immunization systems and strong polio infrastructure; (3) to certify all regions as polio-free and safely contain all poliovirus stocks; (4) and to mainstream the investment in polio eradication to benefit other priority public health initiatives for years to come. Implementing the Plan and meeting the milestones in a timely manner will help to ensure that that the world remains permanently polio-free.
Structural assembly demonstration experiment, phase 1
NASA Astrophysics Data System (ADS)
Akin, David L.; Bowden, Mary L.; Miller, Rene H.
1983-03-01
The goal of this phase of the structural assembly and demonstration experiment (SADE) program was to begin to define a shuttle flight experiment that would yield data to compare on-orbit assembly operations of large space structures with neutral buoyancy simulations. In addition, the experiment would be an early demonstration of structural hardware and human capabilities in extravehicular activity (EVA). The objectives of the MIT study, as listed in the statement of work, were: to provide support in establishing a baseline neutral buoyancy testing data base, to develop a correlation technique between neutral buoyancy test results and on-orbit operations, and to prepare the SADE experiment plan (MSFC-PLAN-913).
Ground test article for deployable space structure systems
NASA Technical Reports Server (NTRS)
Malloy, G. D.
1984-01-01
The ground test article fabrication and assembly plan was completed by Santek Engineering, Inc. The plan was reviewed and accepted by Rockwell during an on-site visit to the Santek facility. Raw material and hardware orders were placed by Santek in July. Approximately 98% of the raw materials and 10% of the hardware deliveries have been completed. Several material and hardware substitutions were requested by Santek due to no-bid responses from suppliers or excessive costs for limited quantity items. These substitutions were evaluated and approved by Rockwell Engineering and Material and Process and are being incorporated into the drawing package. Santek started fabrication of detail parts in mid-August. Their current resource utilization is at approximately 50% of the planned eventual commitment and is increasing at a rate commensurate with the fabrication and assembly plan. At this writing, Santek's estimate of completion is 03%. During verification testing of the diagonal member joint, in a program funded by Rockwell discretionary funds, the axial load to unlock the joint was found to increase significantly after a few cycles of operation. This was attributed to galling, poor lubrication, and locking pin geometry. A change of materials, lubricant, and modification of the pin geometry reduced the unlocking load and provided repeatability after 50 cycles of operation. This new design is being implemented into the ground test article.
Comparative evaluation of ERTS-A imagery for resource inventory in land-use planning
NASA Technical Reports Server (NTRS)
Simonson, G. H. (Principal Investigator)
1972-01-01
There are no author-identified significant results in this report. The overall objectives of this program are: (1) use of multidiscipline team approach to determine features that can be successfully monitored by ERTS-1 imagery for resource inventory, planning, land use zoning, and resource development; and (2) using carefully selected sample areas, develop a comprehensive resource inventory mapping system for use in planning, zoning, and resource development. Progress has included compilation and organization of ground truth data and observations in the primary study area of Crook County; resource inventory legend development; assembly and testing of color enhancement equipment; development and adaption of programs for digital data processing; and quick-look evaluations of initial ERTS-1 imagery for Oregon.
Advanced space program studies: Overall executive summary
NASA Technical Reports Server (NTRS)
Sitney, L. R.
1974-01-01
Studies were conducted to provide NASA with advanced planning analyses which relate integrated space program goals and options to credible technical capabilities, applications potential, and funding resources. The studies concentrated on the following subjects: (1) upper stage options for the space transportation system based on payload considerations, (2) space servicing and standardization of payloads, (3) payload operations, and (4) space transportation system economic analyses related to user charges and new space applications. A systems cost/performance model was developed to synthesize automated, unmanned spacecraft configurations based on the system requirements and a list of equipments at the assembly level.
Studies in knowledge-based diagnosis of failures in robotic assembly
NASA Technical Reports Server (NTRS)
Lam, Raymond K.; Pollard, Nancy S.; Desai, Rajiv S.
1990-01-01
The telerobot diagnostic system (TDS) is a knowledge-based system that is being developed for identification and diagnosis of failures in the space robotic domain. The system is able to isolate the symptoms of the failure, generate failure hypotheses based on these symptoms, and test their validity at various levels by interpreting or simulating the effects of the hypotheses on results of plan execution. The implementation of the TDS is outlined. The classification of failures and the types of system models used by the TDS are discussed. A detailed example of the TDS approach to failure diagnosis is provided.
John Epifanio; Gordon Haas; Karen Pratt; Bruce Rieman; Paul Spruell; Craig Stockwell; Fred Utter; William Young
2003-01-01
Bull trout (Salvelinus confluentus) is a species of conservation concern-listed as "threatened" under the Endangered Species Act-throughout its native range in the western United States. The authors were assembled by the Clark Fork River Aquatic Implementation Team, composed of biologists representing Montana Fish, Wildlife and Parks (MFWP); Idaho Department...
NASA Technical Reports Server (NTRS)
2002-01-01
A software system that uses artificial intelligence techniques to help with complex Space Shuttle scheduling at Kennedy Space Center is commercially available. Stottler Henke Associates, Inc.(SHAI), is marketing its automatic scheduling system, the Automated Manifest Planner (AMP), to industries that must plan and project changes many different times before the tasks are executed. The system creates optimal schedules while reducing manpower costs. Using information entered into the system by expert planners, the system automatically makes scheduling decisions based upon resource limitations and other constraints. It provides a constraint authoring system for adding other constraints to the scheduling process as needed. AMP is adaptable to assist with a variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction. AMP can benefit vehicle assembly plants, batch processing plants, semiconductor manufacturing, printing and textiles, surface and underground mining operations, and maintenance shops. For most of SHAI's commercial sales, the company obtains a service contract to customize AMP to a specific domain and then issues the customer a user license.
2010-01-12
CAPE CANAVERAL, Fla. - In the Remote Manipulator System Lab, or RMS Lab, inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, Rafael Rodriguez, lead RMS advanced systems technician with United Space Alliance, installs the mid-transition thermal blanket onto the inspection boom assembly, or IBA, on space shuttle Atlantis' orbiter boom sensor system, or OBSS. The IBA is removed from the shuttle every other processing flow for a detailed inspection. After five consecutive flights, all IBA internal components are submitted to a thorough electrical checkout in the lab. The 50-foot-long OBSS attaches to the end of the shuttle’s robotic arm and supports the cameras and laser systems used to inspect the shuttle’s thermal protection system while in space. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. Launch is targeted for May 14, 2010. Photo credit: NASA/Jack Pfaller
2010-01-12
CAPE CANAVERAL, Fla. - In the Remote Manipulator System Lab inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, Patrick Manning, an advanced systems technician with United Space Alliance, installs the mid-transition thermal blanket onto the inspection boom assembly, or IBA, on space shuttle Atlantis' orbiter boom sensor system, or OBSS. The IBA is removed from the shuttle every other processing flow for a detailed inspection. After five consecutive flights, all IBA internal components are submitted to a thorough electrical checkout in the lab. The 50-foot-long OBSS attaches to the end of the shuttle’s robotic arm and supports the cameras and laser systems used to inspect the shuttle’s thermal protection system while in space. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. Launch is targeted for May 14, 2010. Photo credit: NASA/Jack Pfaller
System performance predictions for Space Station Freedom's electric power system
NASA Technical Reports Server (NTRS)
Kerslake, Thomas W.; Hojnicki, Jeffrey S.; Green, Robert D.; Follo, Jeffrey C.
1993-01-01
Space Station Freedom Electric Power System (EPS) capability to effectively deliver power to housekeeping and user loads continues to strongly influence Freedom's design and planned approaches for assembly and operations. The EPS design consists of silicon photovoltaic (PV) arrays, nickel-hydrogen batteries, and direct current power management and distribution hardware and cabling. To properly characterize the inherent EPS design capability, detailed system performance analyses must be performed for early stages as well as for the fully assembled station up to 15 years after beginning of life. Such analyses were repeatedly performed using the FORTRAN code SPACE (Station Power Analysis for Capability Evaluation) developed at the NASA Lewis Research Center over a 10-year period. SPACE combines orbital mechanics routines, station orientation/pointing routines, PV array and battery performance models, and a distribution system load-flow analysis to predict EPS performance. Time-dependent, performance degradation, low earth orbit environmental interactions, and EPS architecture build-up are incorporated in SPACE. Results from two typical SPACE analytical cases are presented: (1) an electric load driven case and (2) a maximum EPS capability case.
Component-Level Electronic-Assembly Repair (CLEAR) System Architecture
NASA Technical Reports Server (NTRS)
Oeftering, Richard C.; Bradish, Martin A.; Juergens, Jeffrey R.; Lewis, Michael J.; Vrnak, Daniel R.
2011-01-01
This document captures the system architecture for a Component-Level Electronic-Assembly Repair (CLEAR) capability needed for electronics maintenance and repair of the Constellation Program (CxP). CLEAR is intended to improve flight system supportability and reduce the mass of spares required to maintain the electronics of human rated spacecraft on long duration missions. By necessity it allows the crew to make repairs that would otherwise be performed by Earth based repair depots. Because of practical knowledge and skill limitations of small spaceflight crews they must be augmented by Earth based support crews and automated repair equipment. This system architecture covers the complete system from ground-user to flight hardware and flight crew and defines an Earth segment and a Space segment. The Earth Segment involves database management, operational planning, and remote equipment programming and validation processes. The Space Segment involves the automated diagnostic, test and repair equipment required for a complete repair process. This document defines three major subsystems including, tele-operations that links the flight hardware to ground support, highly reconfigurable diagnostics and test instruments, and a CLEAR Repair Apparatus that automates the physical repair process.
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA, John F. ...
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA, John F. Kennedy Space Center, Florida. Drawing 79K05424, Seelye Stevenson Value & Knecht, March, 1975. SITE WORK, GENERAL AREA PLAN. Sheet 8 of 207 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
NASA Technical Reports Server (NTRS)
Sours, Thomas J.
1989-01-01
A concept is described for the assembly of the outboard PV modules for Space Station Freedom. Analysis of the on-orbit assembly operations was performed using CADAM design graphics software. A scenario for assembly using the various assembly equipment, as currently defined, is described in words, tables and illustrations. This work is part of ongoing studies in the area of space station assembly. The outboard PV module and the assembly equipment programs are all in definition and preliminary design phases. An input is provided to the design process of assembly equipment programs. It is established that the outboard PV module assembly operations can be performed using the assembly equipment currently planned in the Space Station Freedom Program.
Development of EarthCube Governance: An Agile Approach
NASA Astrophysics Data System (ADS)
Pearthree, G.; Allison, M. L.; Patten, K.
2013-12-01
Governance of geosciences cyberinfrastructure is a complex and essential undertaking, critical in enabling distributed knowledge communities to collaborate and communicate across disciplines, distances, and cultures. Advancing science with respect to 'grand challenges," such as global climate change, weather prediction, and core fundamental science, depends not just on technical cyber systems, but also on social systems for strategic planning, decision-making, project management, learning, teaching, and building a community of practice. Simply put, a robust, agile technical system depends on an equally robust and agile social system. Cyberinfrastructure development is wrapped in social, organizational and governance challenges, which may significantly impede progress. An agile development process is underway for governance of transformative investments in geosciences cyberinfrastructure through the NSF EarthCube initiative. Agile development is iterative and incremental, and promotes adaptive planning and rapid and flexible response. Such iterative deployment across a variety of EarthCube stakeholders encourages transparency, consensus, accountability, and inclusiveness. A project Secretariat acts as the coordinating body, carrying out duties for planning, organizing, communicating, and reporting. A broad coalition of stakeholder groups comprises an Assembly (Mainstream Scientists, Cyberinfrastructure Institutions, Information Technology/Computer Sciences, NSF EarthCube Investigators, Science Communities, EarthCube End-User Workshop Organizers, Professional Societies) to serve as a preliminary venue for identifying, evaluating, and testing potential governance models. To offer opportunity for broader end-user input, a crowd-source approach will engage stakeholders not involved otherwise. An Advisory Committee from the Earth, ocean, atmosphere, social, computer and library sciences is guiding the process from a high-level policy point of view. Developmental evaluators from the social sciences embedded in the project provide real-time review and adjustments. While a large number of agencies and organizations have agreed to participate, in order to ensure an open and inclusive process, community selected leaders yet to be identified will play key roles through an Assembly Advisory Council. Once consensus is reached on a governing framework, a community-selected demonstration governance pilot will help facilitate community convergence on system design.
NASA Technical Reports Server (NTRS)
Agnew, Donald L.; Jones, Peter A.
1989-01-01
A study was conducted to define reasonable and representative LDR system concepts for the purpose of defining a technology development program aimed at providing the requisite technological capability necessary to start LDR development by the end of 1991. This volume presents thirteen technology assessments and technology development plans, as well as an overview and summary of the LDR concepts. Twenty-two proposed augmentation projects are described (selected from more than 30 candidates). The five LDR technology areas most in need of supplementary support are: cryogenic cooling; astronaut assembly of the optically precise LDR in space; active segmented primary mirror; dynamic structural control; and primary mirror contamination control. Three broad, time-phased, five-year programs were synthesized from the 22 projects, scheduled, and funding requirements estimated.
Automated micromanipulation desktop station based on mobile piezoelectric microrobots
NASA Astrophysics Data System (ADS)
Fatikow, Sergej
1996-12-01
One of the main problems of present-day research on microsystem technology (MST) is to assemble a whole micro- system from different microcomponents. This paper presents a new concept of an automated micromanipulation desktop- station including piezoelectrically driven microrobots placed on a high-precise x-y-stage of a light microscope, a CCD-camera as a local sensor subsystem, a laser sensor unit as a global sensor subsystem, a parallel computer system with C167 microcontrollers, and a Pentium PC equipped additionally with an optical grabber. The microrobots can perform high-precise manipulations (with an accuracy of up to 10 nm) and a nondestructive transport (at a speed of about 3 cm/sec) of very small objects under the microscope. To control the desktop-station automatically, an advanced control system that includes a task planning level and a real-time execution level is being developed. The main function of the task planning sub-system is to interpret the implicit action plan and to generate a sequence of explicit operations which are sent to the execution level of the control system. The main functions of the execution control level are the object recognition, image processing and feedback position control of the microrobot and the microscope stage.
JPRS Report Science & Technology Japan
1989-10-25
Testing Slated for New BWR Fuel Assemblies [GENSHIRYOKU SANGYO SHIMBUN, 25 May 89] .... 37 Nuclear Fuel Planning System Developed [GENSHIRYOKU... Development (Debt) 13,272 ((Debt) 3,839) 7,995 (3,610) In addition, the budget has guaranteed that the following programs will proceed according... develop a combined cycle engine that will be capable of attaining high reliability and good fuel consumption at a wide range of speeds from low speed to
Marine Corps Systems Command (MCSC) Advanced Planning Briefing To Industry (APBI)
2008-05-14
High force protection bill associated with establishing and maintaining a secure lodgment – Ships densely packed, assemble ashore • MPF(F) – Operates...14 May 08 EXPEDITIONARY FIGHTING VEHICLE (EFV) Provide High Speed Transport of Embarked Marine Infantry From Ships Located Beyond the Horizon to...Business Size Crafting your RFI Response DO - Focus exclusively on Past Performance Provide a “Team” Brief Focus on “non-Priorities” Include
Service Test Plan for A-10 Hydraulic Actuators
2014-05-29
utilizes electroplated chrome as a wear coating on the actuator assembly. This actuator will be delta-qualified while two other actuators will be qualified...2730534-1 Similarity to (1) 3 Elevator Actuator Hydraulic Flight Control System 2730551-5 Similarity to (1) The current chrome electroplating ...process has been proven to be a significant health hazard, and it is anticipated that future Government regulation will make the use of electroplated
Artificial Intelligence - Research and Applications
1975-05-01
G, »aln H, Harrow A, Brain B, Deutsch P, Duda R, Flues T, Garvey P. Hart G, Hendrlx 0, Lynch B. Meyer M. Pattner C . Sacerdotl D ...System a. The Procedural Net b. Task-Specific Knowledge c . The Planning Algorithm d . The Execution Algorithm 3. The Semantics of Assembly and...101 3. Querying State Description Models 103 a. Truth Values 103 b. Generators Instead of Backtracking 104 c . The Query Functions 107 d
Potential roles for EVA and telerobotics in a unified worksite
NASA Astrophysics Data System (ADS)
Akin, David; Howard, Russel D.
1993-02-01
Although telerobotics and extravehicular activity (EVA) are often portrayed as competitive approaches to space operations, ongoing research in the Space Systems Laboratory (SSL) has demonstrated the utility of cooperative roles in an integrated EVA/telerobotic work site. Working in the neutral buoyancy simulation environment, tests were performed on interactive roles or EVA subjects and telerobots in structural assembly and satellite servicing tasks. In the most elaborate of these tests to date, EVA subjects were assisted by the SSL's Beam Assembly Teleoperator (BAT) in several servicing tasks planned for Hubble Space Telescope, using the high-fidelity crew training article in the NASA Marshall Neutral Buoyancy Simulator. These tests revealed several shortcomings in the design of BAT for satellite servicing and demonstrated the utility of a free-flying or RMS-mounted telerobot for providing EVA crew assistance. This paper documents the past tests, including the use of free-flying telerobots to effect the rescue of a simulated incapacitated EVA subject, and details planned future efforts in this area, including the testing of a new telerobotic system optimized for the satellite servicing role, the development of dedicated telerobotic devices designed specifically for assisting EVA crew, and conceptual approaches to advanced EVA/telerobotic operations such as the Astronaut Operations Vehicle.
NASA Technical Reports Server (NTRS)
Gibbel, Mark; Larson, Tim
1999-01-01
Due to a post launch failure of a part a new plan for the Mars Global Surveyor was developed. This new plan involved the addition of many deep thermal cycles to the Power Shunt Assemblies (PSA's). This new plan exceeds the previous acceptance cold level, and fatigue life on packaging design. This presentation reviews the experiments that were used to test the capabilities of the PSA to function in the new situation. It also reviews the analyses preformed to verify the most likely failure mechanism, and the likelihood that these failures would impact the new mission requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... OF DEFENSE ACQUISITION PLANNING ACQUISITION PLANNING Buy-to-Budget-Additional Quantities of End Items 207.7001 Definition. End item, as used in this subpart, means a production product assembled...
Code of Federal Regulations, 2013 CFR
2013-10-01
... OF DEFENSE ACQUISITION PLANNING ACQUISITION PLANNING Buy-to-Budget-Additional Quantities of End Items 207.7001 Definition. End item, as used in this subpart, means a production product assembled...
Code of Federal Regulations, 2010 CFR
2010-10-01
... OF DEFENSE ACQUISITION PLANNING ACQUISITION PLANNING Buy-to-Budget-Additional Quantities of End Items 207.7001 Definition. End item, as used in this subpart, means a production product assembled...
Code of Federal Regulations, 2011 CFR
2011-10-01
... OF DEFENSE ACQUISITION PLANNING ACQUISITION PLANNING Buy-to-Budget-Additional Quantities of End Items 207.7001 Definition. End item, as used in this subpart, means a production product assembled...
Code of Federal Regulations, 2012 CFR
2012-10-01
... OF DEFENSE ACQUISITION PLANNING ACQUISITION PLANNING Buy-to-Budget-Additional Quantities of End Items 207.7001 Definition. End item, as used in this subpart, means a production product assembled...
2012-07-02
CAPE CANAVERAL, Fla. – NASA astronaut Ricky Arnold addresses the audience assembled in Kennedy Space Center's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. The capsule was shipped to Kennedy from NASA's Michoud Assembly Facility in New Orleans where the crew module pressure vessel was built. The Orion production team will prepare the module for flight at Kennedy by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2012-07-02
CAPE CANAVERAL, Fla. – NASA Kennedy Space Center Director Robert Cabana addresses the audience assembled in Kennedy's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. The capsule was shipped to Kennedy from NASA's Michoud Assembly Facility in New Orleans where the crew module pressure vessel was built. The Orion production team will prepare the module for flight at Kennedy by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2012-07-02
CAPE CANAVERAL, Fla. – U.S. Senator Bill Nelson addresses the audience assembled in Kennedy Space Center's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. The capsule was shipped to Kennedy from NASA's Michoud Assembly Facility in New Orleans where the crew module pressure vessel was built. The Orion production team will prepare the module for flight at Kennedy by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2012-07-02
CAPE CANAVERAL, Fla. – NASA Deputy Administrator Lori Garver addresses the audience assembled in Kennedy Space Center's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. The capsule was shipped to Kennedy from NASA's Michoud Assembly Facility in New Orleans where the crew module pressure vessel was built. The Orion production team will prepare the module for flight at Kennedy by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2012-07-02
CAPE CANAVERAL, Fla. – NASA Kennedy Space Center Director Robert Cabana addresses the audience assembled in Kennedy's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. The capsule was shipped to Kennedy from NASA's Michoud Assembly Facility in New Orleans where the crew module pressure vessel was built. The Orion production team will prepare the module for flight at Kennedy by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2012-07-02
CAPE CANAVERAL, Fla. – NASA Kennedy Space Center Director Robert Cabana addresses the audience assembled in Kennedy's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. The capsule was shipped to Kennedy from NASA's Michoud Assembly Facility in New Orleans where the crew module pressure vessel was built. The Orion production team will prepare the module for flight at Kennedy by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2012-07-02
CAPE CANAVERAL, Fla. – NASA Deputy Administrator Lori Garver addresses the audience assembled in Kennedy Space Center's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. The capsule was shipped to Kennedy from NASA's Michoud Assembly Facility in New Orleans where the crew module pressure vessel was built. The Orion production team will prepare the module for flight at Kennedy by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2012-07-02
CAPE CANAVERAL, Fla. – NASA Deputy Administrator Lori Garver addresses the audience assembled in Kennedy Space Center's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. The capsule was shipped to Kennedy from NASA's Michoud Assembly Facility in New Orleans where the crew module pressure vessel was built. The Orion production team will prepare the module for flight at Kennedy by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2012-07-02
CAPE CANAVERAL, Fla. – U.S. Senator Bill Nelson addresses the audience assembled in Kennedy Space Center's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. The capsule was shipped to Kennedy from NASA's Michoud Assembly Facility in New Orleans where the crew module pressure vessel was built. The Orion production team will prepare the module for flight at Kennedy by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2012-07-02
CAPE CANAVERAL, Fla. – NASA Kennedy Space Center Director Robert Cabana addresses the audience assembled in Kennedy Space Center's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. The capsule was shipped to Kennedy from NASA's Michoud Assembly Facility in New Orleans where the crew module pressure vessel was built. The Orion production team will prepare the module for flight at Kennedy by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2012-07-02
CAPE CANAVERAL, Fla. – NASA Deputy Administrator Lori Garver addresses the audience assembled in Kennedy Space Center's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. The capsule was shipped to Kennedy from NASA's Michoud Assembly Facility in New Orleans where the crew module pressure vessel was built. The Orion production team will prepare the module for flight at Kennedy by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2012-07-02
CAPE CANAVERAL, Fla. – Mark Geyer, Orion program manager, addresses the audience assembled in Kennedy Space Center's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. The capsule was shipped to Kennedy from NASA's Michoud Assembly Facility in New Orleans where the crew module pressure vessel was built. The Orion production team will prepare the module for flight at Kennedy by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2012-07-02
CAPE CANAVERAL, Fla. – Orion Program Manager Mark Geyer addresses the audience assembled in Kennedy Space Center's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. The capsule was shipped to Kennedy from NASA's Michoud Assembly Facility in New Orleans where the crew module pressure vessel was built. The Orion production team will prepare the module for flight at Kennedy by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett
2015-05-27
The Mars lander that NASA's InSight mission will use for investigating how rocky planets formed and evolved is being assembled by Lockheed Martin Space Systems, Denver. In this scene from January 2015, Lockheed Martin spacecraft specialists are working on the lander in a clean room. InSight, for Interior Exploration Using Seismic Investigations, Geodesy and Heat Transport, is scheduled for launch in March 2016 and landing in September 2016. Note: After thorough examination, NASA managers have decided to suspend the planned March 2016 launch of the Interior Exploration using Seismic Investigations Geodesy and Heat Transport (InSight) mission. The decision follows unsuccessful attempts to repair a leak in a section of the prime instrument in the science payload. http://photojournal.jpl.nasa.gov/catalog/PIA19402
2014-09-25
CAPE CANAVERAL, Fla. – Coupled Florida East Coast Railway, or FEC, locomotives No. 433 and No. 428 pass the Vehicle Assembly Building in Launch Complex 39 at NASA’s Kennedy Space Center in Florida on their way to NASA's Locomotive Maintenance Facility. Kennedy's Center Planning and Development Directorate has enlisted the locomotives to support a Rail Vibration Test for the Canaveral Port Authority. The purpose of the test is to collect amplitude, frequency and vibration test data utilizing two Florida East Coast locomotives operating on KSC tracks to ensure that future railroad operations will not affect launch vehicle processing at the center. Buildings instrumented for the test include the Rotation Processing Surge Facility, Thermal Protection Systems Facility, Vehicle Assembly Building, Orbiter Processing Facility and Booster Fabrication Facility. Photo credit: NASA/Daniel Casper
Space construction system analysis. Part 2: Construction analysis
NASA Technical Reports Server (NTRS)
Roebuck, J. A.; Buck, P. A.; Gimlich, G. W.; Greenberg, H. S.; Hart, R. J.; Indrikis, J.; Lefever, A. E.; Lillenas, A. N.; Mcbaine, C. K.
1980-01-01
The construction methods specific to the end to end construction process for building the ETVP in low Earth orbit, using the space shuttle orbiter as a construction base, are analyzed. The analyses concerned three missions required to build the basic platform. The first mission involved performing the fabrication of beams in space and assembling the beams into a basic structural framework. The second mission was to install the forward support structure and aft support structure, the forward assembly, and a TT&C antenna. The third mission plan was to complete the construction of the platform and activate it to begin operations in low Earth orbit. The integration of the activities for each mission is described along with the construction requirements and construction logic.
2010-01-12
CAPE CANAVERAL, Fla. - In the Remote Manipulator System Lab inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, this close-up shows the electrical flight grapple fixture which will be installed in the forward transition and X-guide restraint of the inspection boom assembly, or IBA, on space shuttle Atlantis' orbiter boom sensor system, or OBSS. The IBA is removed from the shuttle every other processing flow for a detailed inspection. After five consecutive flights, all IBA internal components are submitted to a thorough electrical checkout in the lab. The 50-foot-long OBSS attaches to the end of the shuttle’s robotic arm and supports the cameras and laser systems used to inspect the shuttle’s thermal protection system while in space. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. Launch is targeted for May 14, 2010. Photo credit: NASA/Jack Pfaller
Wood, Nathan J.; Jones, Jeanne M.; Schmidtlein, Mathew; Schelling, John; Frazier, T.
2016-01-01
Successful evacuations are critical to saving lives from future tsunamis. Pedestrian-evacuation modeling related to tsunami hazards primarily has focused on identifying areas and the number of people in these areas where successful evacuations are unlikely. Less attention has been paid to identifying evacuation pathways and population demand at assembly areas for at-risk individuals that may have sufficient time to evacuate. We use the neighboring coastal communities of Hoquiam, Aberdeen, and Cosmopolis (Washington, USA) and the local tsunami threat posed by Cascadia subduction zone earthquakes as a case study to explore the use of geospatial, least-cost-distance evacuation modeling for supporting evacuation outreach, response, and relief planning. We demonstrate an approach that uses geospatial evacuation modeling to (a) map the minimum pedestrian travel speeds to safety, the most efficient paths, and collective evacuation basins, (b) estimate the total number and demographic description of evacuees at predetermined assembly areas, and (c) determine which paths may be compromised due to earthquake-induced ground failure. Results suggest a wide range in the magnitude and type of evacuees at predetermined assembly areas and highlight parts of the communities with no readily accessible assembly area. Earthquake-induced ground failures could obstruct access to some assembly areas, cause evacuees to reroute to get to other assembly areas, and isolate some evacuees from relief personnel. Evacuation-modeling methods and results discussed here have implications and application to tsunami-evacuation outreach, training, response procedures, mitigation, and long-term land use planning to increase community resilience.
NASA Technical Reports Server (NTRS)
Norgard, John D.
2012-01-01
For future NASA Manned Space Exploration of the Moon and Mars, a blunt body capsule, called the Orion Crew Exploration Vehicle (CEV), composed of a Crew Module (CM) and a Service Module (SM), with a parachute decent assembly is planned for reentry back to Earth. A Capsule Parachute Assembly System (CPAS) is being developed for preliminary parachute drop tests at the Yuma Proving Ground (YPG) to simulate high-speed reentry to Earth from beyond Low-Earth-Orbit (LEO) and to provide measurements of landing parameters and parachute loads. The avionics systems on CPAS also provide mission critical firing events to deploy, reef, and release the parachutes in three stages (extraction, drogues, mains) using mortars and pressure cartridge assemblies. In addition, a Mid-Air Delivery System (MDS) is used to separate the capsule from the sled that is used to eject the capsule from the back of the drop plane. Also, high-speed and high-definition cameras in a Video Camera System (VCS) are used to film the drop plane extraction and parachute landing events. To verify Electromagnetic Compatibility (EMC) of the CPAS system from unintentional radiation, Electromagnetic Interference (EMI) measurements are being made inside a semi-anechoic chamber at NASA/JSC at 1m from the electronic components of the CPAS system. In addition, EMI measurements of the integrated CPAS system are being made inside a hanger at YPG. These near-field B-Dot probe measurements on the surface of a parachute simulator (DART) are being extrapolated outward to the 1m standard distance for comparison to the MIL-STD radiated emissions limit.
NASA Astrophysics Data System (ADS)
Hilburn, Monty D.
Successful lean manufacturing and cellular manufacturing execution relies upon a foundation of leadership commitment and strategic planning built upon solid data and robust analysis. The problem for this study was to create and employ a simple lean transformation planning model and review process that could be used to identify functional support staff resources required to plan and execute lean manufacturing cells within aerospace assembly and manufacturing sites. The lean planning model was developed using available literature for lean manufacturing kaizen best practices and validated through a Delphi panel of lean experts. The resulting model and a standardized review process were used to assess the state of lean transformation planning at five sites of an international aerospace manufacturing and assembly company. The results of the three day, on-site review were compared with baseline plans collected from each of the five sites to determine if there analyzed, with focus on three critical areas of lean planning: the number and type of manufacturing cells identified, the number, type, and duration of planned lean and continuous kaizen events, and the quantity and type of functional staffing resources planned to support the kaizen schedule. Summarized data of the baseline and on-site reviews was analyzed with descriptive statistics. ANOVAs and paired-t tests at 95% significance level were conducted on the means of data sets to determine if null hypotheses related to cell, kaizen event, and support resources could be rejected. The results of the research found significant differences between lean transformation plans developed by site leadership and plans developed utilizing the structured, on-site review process and lean transformation planning model. The null hypothesis that there was no difference between the means of pre-review and on-site cell counts was rejected, as was the null hypothesis that there was no significant difference in kaizen event plans. These factors are critical inputs into the support staffing resources calculation used by the lean planning model. Null hypothesis related to functional support staff resources was rejected for most functional groups, indicating that the baseline site plan inadequately provided for cross-functional staff involvement to support the lean transformation plan. Null hypotheses related to total lean transformation staffing could not be rejected, indicating that while total staffing plans were not significantly different than plans developed during the on-site review and through the use of the lean planning model, the allocation of staffing among various functional groups such as engineering, production, and materials planning was an issue. The on-site review process and simple lean transformation plan developed was determined to be useful in identifying short-comings in lean transformation planning within aerospace manufacturing and assembly sites. It was concluded that the differences uncovered were likely contributing factors affecting the effectiveness of aerospace manufacturing sites' implementation of lean cellular manufacturing.
Predictive Modeling of the CDRA 4BMS
NASA Technical Reports Server (NTRS)
Coker, Robert F.; Knox, James C.
2016-01-01
As part of NASA's Advanced Exploration Systems (AES) program and the Life Support Systems Project (LSSP), fully predictive models of the Four Bed Molecular Sieve (4BMS) of the Carbon Dioxide Removal Assembly (CDRA) on the International Space Station (ISS) are being developed. This virtual laboratory will be used to help reduce mass, power, and volume requirements for future missions. In this paper we describe current and planned modeling developments in the area of carbon dioxide removal to support future crewed Mars missions as well as the resolution of anomalies observed in the ISS CDRA.
A&M. TAN607 first floor plan for cold assembly area. Shows ...
A&M. TAN-607 first floor plan for cold assembly area. Shows special source vaults, X-ray room, instrument shops, and positions of large machines in component test laboratory. This drawing was re-drawn to show conditions in 1994. Ralph M. Parsons 902-3-ANP-607-A 100. Date of original: December 1952. Approved by INEEL Classification Office for public release. INEEL index code no. 034-060-00-693-106752 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
Freehafer, Douglas A.; Pierson, Oliver
2004-01-01
In the fall of 2002, the Onondaga Lake Partnership (OLP) formed a Geographic Information System (GIS) Planning Committee to begin the process of developing a comprehensive watershed geographic information system for Onondaga Lake. The goal of the Onondaga Lake Partnership geographic information system is to integrate the various types of spatial data used for scientific investigations, resource management, and planning and design of improvement projects in the Onondaga Lake Watershed. A needs-assessment survey was conducted and a spatial data framework developed to support the Onondaga Lake Partnership use of geographic information system technology. The design focused on the collection, management, and distribution of spatial data, maps, and internet mapping applications. A geographic information system library of over 100 spatial datasets and metadata links was assembled on the basis of the results of the needs assessment survey. Implementation options were presented, and the Geographic Information System Planning Committee offered recommendations for the management and distribution of spatial data belonging to Onondaga Lake Partnership members. The Onondaga Lake Partnership now has a strong foundation for building a comprehensive geographic information system for the Onondaga Lake watershed. The successful implementation of a geographic information system depends on the Onondaga Lake Partnership’s determination of: (1) the design and plan for a geographic information system, including the applications and spatial data that will be provided and to whom, (2) the level of geographic information system technology to be utilized and funded, and (3) the institutional issues of operation and maintenance of the system.
Repair of major system elements on Skylab
NASA Technical Reports Server (NTRS)
Pace, R. E., Jr.
1975-01-01
In-flight maintenance, as conceived and pre-planned for the Skylab Mission, was limited to simple scheduled and unscheduled replacement tasks and minor contingency repairs. Failures during the mission dictated complicated and sophisticated repairs to major systems so that the mission could continue. These repairs include the release of a large structure that failed to deploy, the assembly and deployment of large mechanical devices, the installation and checkout of precision electronic equipment, troubleshooting and repair of precision electromechanical equipment and tapping into and recharging a cooling system. The Skylab experience proves conclusively that crewmen can, with adequate training, make major system repairs in space using standard or special tools.
Experimental study of trajectory planning and control of a high precision robot manipulator
NASA Technical Reports Server (NTRS)
Nguyen, Charles C.; Antrazi, Sami S.
1991-01-01
The kinematic and trajectory planning is presented for a 6 DOF end-effector whose design was based on the Stewart Platform mechanism. The end-effector was used as a testbed for studying robotic assembly of NASA hardware with passive compliance. Vector analysis was employed to derive a closed-form solution for the end-effector inverse kinematic transformation. A computationally efficient numerical solution was obtained for the end-effector forward kinematic transformation using Newton-Raphson method. Three trajectory planning schemes, two for fine motion and one for gross motion, were developed for the end-effector. Experiments conducted to evaluate the performance of the trajectory planning schemes showed excellent tracking quality with minimal errors. Current activities focus on implementing the developed trajectory planning schemes on mating and demating space-rated connectors and using the compliant platform to acquire forces/torques applied on the end-effector during the assembly task.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Plans. 159.005-12 Section 159.005-12 Shipping COAST...: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Approval Procedures § 159.005-12 Plans. (a) Each set of plans under § 159.005-9(a)(5)(ii) for equipment must include the following: (1) An assembly...
NASA Astrophysics Data System (ADS)
Jin, S.; Lee, Y. M.; Jeong, S. Y.; Hong, S. J.
2016-12-01
The considerable casualties were resulted at the tsunami shelters during the Great East Japan Tsunami on 11 March 2011. The one of the important lessons learned from the Great East Japan Tsunami and the Fukushima NPP accidents provided the nuclear power plant emergency plan should consider the natural disaster. However, most of cases, the nuclear emergency preparedness strategies have not incorporated the natural disaster management plan. In this study, we reviewed the safety of the assembly areas, evacuation routes, and shelters of some nuclear emergency planning zone using the new tsunami hazard mapping results through the characteristic inundation analysis. As the result of this study, the improvements can be achieved by considering both natural and nuclear disaster to set up the assembly areas, evacuation routes, and shelters against the multiple disasters. Also, The most important protective measures can be achieved by integrating and linking the emergency preparedness strategy both natural disasters and nuclear disaster in the future.
NASA Technical Reports Server (NTRS)
1993-01-01
The observational limitations of earth bound solar studies has prompted a great deal of interest in recent months in being able to gain new scientific perspectives through, what should prove to be, relatively low cost flight of the magnetograph system. The ground work done by TBE for the solar balloon missions (originally planned for SOUP and GRID) as well as the rather advanced state of assembly of the EXVM has allowed the quick formulation of a mission concept for the 30 cm system currently being assembled. The flight system operational configuration will be discussed as it is proposed for short duration flight (on the order of one day) over the continental United States. Balloon hardware design requirements used in formulation of the concept are those set by the National Science Balloon Facility (NSBF), the support agency under NASA contract for flight services. The concept assumes that the flight hardware assembly would come together from three development sources: the scientific investigator package, the integration contractor package, and the NSBF support system. The majority of these three separate packages can be independently developed; however, the computer control interfaces and telemetry links would require extensive preplanning and coordination. A special section of this study deals with definition of a dedicated telemetry link to be provided by the integration contractor for video image data for pointing system performance verification. In this study the approach has been to capitalize to the maximum extent possible on existing hardware and system design. This is the most prudent step that can be taken to reduce eventual program cost for long duration flights. By fielding the existing EXVM as quickly as possible, experience could be gained from several short duration flight tests before it became necessary to commit to major upgrades for long duration flights of this system or of the larger 60 cm version being considered for eventual development.
122. JOB NO. 1347E, SHEET 3S, 1927, DOCK; FORD MOTOR ...
122. JOB NO. 1347-E, SHEET 3S, 1927, DOCK; FORD MOTOR COMPANY; DECK PLAN OF DOCK - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA
Center Planning and Development: Multi-User Spaceport Initiatives
NASA Technical Reports Server (NTRS)
Kennedy, Christopher John
2015-01-01
The Vehicle Assembly building at NASAs Kennedy Space Center has been used since 1966 to vertically assemble every launch vehicle, since the Apollo Program, launched from Launch Complex 39 (LC-39). After the cancellation of the Constellation Program in 2010 and the retirement of the Space Shuttle Program in 2011, the VAB faced an uncertain future. As the Space Launch System (SLS) gained a foothold as the future of American spaceflight to deep space, NASA was only using a portion of the VABs initial potential. With three high bays connected to the Crawler Way transportation system, the potential exists for up to three rockets to be simultaneously processed for launch. The Kennedy Space Center (KSC) Master plan, supported by the Center Planning and Development (CPD) Directorate, is guiding Kennedy toward a 21st century multi-user spaceport. This concept will maintain Kennedy as the United States premier gateway to space and provide multi-user operations through partnerships with the commercial aerospace industry. Commercial aerospace companies, now tasked with transporting cargo and, in the future, astronauts to the International Space Station (ISS) via the Commercial Resupply Service (CRS) and Commercial Crew Program (CCP), are a rapidly growing industry with increasing capabilities to make launch operations more economical for both private companies and the government. Commercial operations to Low Earth Orbit allow the government to focus on travel to farther destinations through the SLS Program. With LC-39B designated as a multi-use launch pad, companies seeking to use it will require an integration facility to assemble, integrate, and test their launch vehicle. An Announcement for Proposals (AFP) was released in June, beginning the process of finding a non-NASA user for High Bay 2 (HB2) and the Mobile Launcher Platforms (MLPs). An Industry Day, a business meeting and tour for interested companies and organizations, was also arranged to identify and answer any additional questions posed by potential proposers. After amending the AFP and posting additional material for potential users to consider, proposals are being accepted until July 31, at which point they will be evaluated to determine the proposer which best meets the objectives of the government. By identifying VAB HB2 as available and seeking proposals from the commercial sector for VAB HB2 and MLP use, Center Planning and Development is ensuring Kennedy Space Centers relevance in the evolving launch industry of the 21st century.
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. ...
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. Kennedy Space Center, Florida. File Number 79K05424, Seelye Stevenson Value & Knecht, March 1975. HIGH BAY 3, EXTENSIBLE WORK PLATFORM E, ROOF PLAN, ARCHITECTURAL. Sheet 22 of 207 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. ...
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. Kennedy Space Center, Florida. File Number 79K05424, Seelye Stevenson Value & Knecht, March 1975. HIGH BAY 3, EXTENSIBLE WORK PLATFORM D, 2ND FLOOR PLAN, ARCHITECTURAL. Sheet 38 of 207 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. ...
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. Kennedy Space Center, Florida. File Number 79K05424, Seelye Stevenson Value & Knecht, March 1975. HIGH BAY 3, EXTENSIBLE WORK PLATFORM D, MAIN FLOOR PLAN, ARCHITECTURAL. Sheet 39 of 207 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. ...
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. Kennedy Space Center, Florida. File Number 79K05424, Seelye Stevenson Value & Knecht, March 1975. HIGH BAY 3, EXTENSIBLE WORK PLATFORM E, MAIN FLOOR PLAN, ARCHITECTURAL. Sheet 23 of 207 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. ...
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. Kennedy Space Center, Florida. File Number 79K05424, Seelye Stevenson Value & Knecht, March 1975. HIGH BAY 3, EXTENSIBLE WORK PLATFORM D, ROOF PLAN, ARCHITECTURAL. Sheet 36 of 207 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. ...
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. Kennedy Space Center, Florida. File Number 79K05424, Seelye Stevenson Value & Knecht, March 1975. HIGH BAY 3, EXTENSIBLE WORK PLATFORM D, 3RD FLOOR PLAN, ARCHITECTURAL. Sheet 37 of 207 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. ...
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. Kennedy Space Center, Florida. File Number 79K05424, Seelye Stevenson Value & Knecht, March 1975. HIGH BAY 3, EXTENSIBLE WORK PLATFORM B, MAIN FLOOR PLAN, ARCHITECTURAL. Sheet 30 of 207 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. ...
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. Kennedy Space Center, Florida. File Number 79K05424, Seelye Stevenson Value & Knecht, March 1975. HIGH BAY 3, EXTENSIBLE WORK PLATFORM C, 2ND FLOOR PLAN, ARCHITECTURAL. Sheet 15 of 207 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. ...
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. Kennedy Space Center, Florida. File Number 79K05424, Seelye Stevenson Value & Knecht, March 1975. HIGH BAY 3, EXTENSIBLE WORK PLATFORM C, ROOF PLAN, ARCHITECTURAL. Sheet 14 of 207 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. ...
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. Kennedy Space Center, Florida. File Number 79K05424, Seelye Stevenson Value & Knecht, March 1975. HIGH BAY 3, EXTENSIBLE WORK PLATFORM B, ROOF PLAN, ARCHITECTURAL. Sheet 28 of 207 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. ...
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. Kennedy Space Center, Florida. File Number 79K05424, Seelye Stevenson Value & Knecht, March 1975. HIGH BAY 3, EXTENSIBLE WORK PLATFORM C, MAIN FLOOR PLAN, ARCHITECTURAL. Sheet 16 of 207 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. ...
Photocopy of drawing. VEHICLE ASSEMBLY BUILDING MODIFICATIONS. NASA John F. Kennedy Space Center, Florida. File Number 79K05424, Seelye Stevenson Value & Knecht, March 1975. HIGH BAY 3, EXTENSIBLE WORK PLATFORM B, 2ND FLOOR PLAN, ARCHITECTURAL. Sheet 29 of 207 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhou, Y; Tan, J; Jiang, S
Purpose: Plan specific quality assurance (QA) is an important step in high dose rate (HDR) brachytherapy to ensure the integrity of a treatment plan. The conventional approach is to assemble a set of plan screen-captures in a document and have an independent plan-checker to verify it. Not only is this approach cumbersome and time-consuming, using a document also limits the items that can be verified, hindering plan quality and patient safety. We have initiated efforts to develop a web-based HDR brachytherapy QA system called AutoBrachy QA, for comprehensive and efficient QA. This abstract reports a new plugin in this systemmore » for the QA of a cylinder HDR brachytherapy treatment. Methods: A cylinder plan QA module was developed using Python. It was plugged into our AutoBrachy QA system. This module extracted information from CT images and treatment plan. Image processing techniques were employed to obtain geometric parameters, e.g. cylinder diameter. A comprehensive set of eight geometrical and eight dosimetric features of the plan were validated against user specified planning parameter, such as prescription value, treatment depth and length, etc. A PDF document was generated, consisting of a summary QA sheet with all the QA results, as well as images showing plan details. Results: The cylinder QA program has been implemented in our clinic. To date, it has been used in 11 patient cases and was able to successfully perform QA tests in all of them. The QA program reduced the average plan QA time from 7 min using conventional manual approach to 0.5 min. Conclusion: Being a new module in our AutoBrachy QA system, an automated treatment plan QA module for cylinder HDR brachytherapy has been successfully developed and clinically implemented. This module improved clinical workflow and plan integrity compared to the conventional manual approach.« less
JPL Contamination Control Engineering
NASA Technical Reports Server (NTRS)
Blakkolb, Brian
2013-01-01
JPL has extensive expertise fielding contamination sensitive missions-in house and with our NASA/industry/academic partners.t Development and implementation of performance-driven cleanliness requirements for a wide range missions and payloads - UV-Vis-IR: GALEX, Dawn, Juno, WFPC-II, AIRS, TES, et al - Propulsion, thermal control, robotic sample acquisition systems. Contamination control engineering across the mission life cycle: - System and payload requirements derivation, analysis, and contamination control implementation plans - Hardware Design, Risk trades, Requirements V-V - Assembly, Integration & Test planning and implementation - Launch site operations and launch vehicle/payload integration - Flight ops center dot Personnel on staff have expertise with space materials development and flight experiments. JPL has capabilities and expertise to successfully address contamination issues presented by space and habitable environments. JPL has extensive experience fielding and managing contamination sensitive missions. Excellent working relationship with the aerospace contamination control engineering community/.
NASA Technical Reports Server (NTRS)
Rowland, John R.; Goldhirsh, Julius; Vogel, Wolfhard J.; Torrence, Geoffrey W.
1991-01-01
An overview and a status description of the planned LMSS mobile K band experiment with ACTS is presented. As a precursor to the ACTS mobile measurements at 20.185 GHz, measurements at 19.77 GHz employing the Olympus satellite were originally planned. However, because of the demise of Olympus in June of 1991, the efforts described here are focused towards the ACTS measurements. In particular, we describe the design and testing results of a gyro controlled mobile-antenna pointing system. Preliminary pointing measurements during mobile operations indicate that the present system is suitable for measurements employing a 15 cm aperture (beamwidth at approximately 7 deg) receiving antenna operating with ACTS in the high gain transponder mode. This should enable measurements with pattern losses smaller than plus or minus 1 dB over more than 95 percent of the driving distance. Measurements with the present mount system employing a 60 cm aperture (beamwidth at approximately 1.7 deg) results in pattern losses smaller than plus or minus 3 dB for 70 percent of the driving distance. Acceptable propagation measurements may still be made with this system by employing developed software to flag out bad data points due to extreme pointing errors. The receiver system including associated computer control software has been designed and assembled. Plans are underway to integrate the antenna mount with the receiver on the University of Texas mobile receiving van and repeat the pointing tests on highways employing a recently designed radome system.
Nuclear reactors built, being built, or planned, 1994
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-07-01
This document contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1994. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington headquarters and field offices of DOE; from the US Nuclear Regulatory Commission (NRC); from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from US and foreign embassies; and from foreign governmental nuclear departments. The book consists of three divisions, as follows: a commercial reactor locator map and tables of the characteristicmore » and statistical data that follow; a table of abbreviations; tables of data for reactors operating, being built, or planned; and tables of data for reactors that have been shut down permanently or dismantled. The reactors are subdivided into the following parts: Civilian, Production, Military, Export, and Critical Assembly. Export reactor refers to a reactor for which the principal nuclear contractor is a US company -- working either independently or in cooperation with a foreign company (Part 4). Critical assembly refers to an assembly of fuel and moderator that requires an external source of neutrons to initiate and maintain fission. A critical assembly is used for experimental measurements (Part 5).« less
Nuclear reactors built, being built, or planned: 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-08-01
This report contains unclassified information about facilities built, being built, or planned in the US for domestic use or export as of December 31, 1995. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington headquarters and field offices of DOE; from the US Nuclear Regulatory Commission (NRC); from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from US and foreign embassies; and from foreign governmental nuclear departments. The book consists of three divisions, as follows: (1) a commercial reactor locator map and tables of the characteristicmore » and statistical data that follow; a table of abbreviations; (2) tables of data for reactors operating, being built, or planned; and (3) tables of data for reactors that have been shut down permanently or dismantled. The reactors are subdivided into the following parts: Civilian, Production, Military, Export, and Critical Assembly. Export reactor refers to a reactor for which the principal nuclear contractor is a US company--working either independently or in cooperation with a foreign company (Part 4). Critical assembly refers to an assembly of fuel and moderator that requires an external source of neutrons to initiate and maintain fission. A critical assembly is used for experimental measurements (Part 5).« less
Clinical Note Creation, Binning, and Artificial Intelligence.
Deliberato, Rodrigo Octávio; Celi, Leo Anthony; Stone, David J
2017-08-03
The creation of medical notes in software applications poses an intrinsic problem in workflow as the technology inherently intervenes in the processes of collecting and assembling information, as well as the production of a data-driven note that meets both individual and healthcare system requirements. In addition, the note writing applications in currently available electronic health records (EHRs) do not function to support decision making to any substantial degree. We suggest that artificial intelligence (AI) could be utilized to facilitate the workflows of the data collection and assembly processes, as well as to support the development of personalized, yet data-driven assessments and plans. ©Rodrigo Octávio Deliberato, Leo Anthony Celi, David J Stone. Originally published in JMIR Medical Informatics (http://medinform.jmir.org), 03.08.2017.
118. JOB NO. 1347M, SHEET 2, 1930/1931, ADDITION FOR PRESSED ...
118. JOB NO. 1347-M, SHEET 2, 1930/1931, ADDITION FOR PRESSED STEEL DEPARTMENT FOR FORD MOTOR COMPANY; FIRST FLOOR PLAN - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA
Applying Mixed Methods Techniques in Strategic Planning
ERIC Educational Resources Information Center
Voorhees, Richard A.
2008-01-01
In its most basic form, strategic planning is a process of anticipating change, identifying new opportunities, and executing strategy. The use of mixed methods, blending quantitative and qualitative analytical techniques and data, in the process of assembling a strategic plan can help to ensure a successful outcome. In this article, the author…
The Comprehensive Dropout Prevention Plan.
ERIC Educational Resources Information Center
Broward County School Board, Fort Lauderdale, FL.
The Comprehensive Dropout Prevention Plan utilizes the resources of Broward County public schools and the community for dropout prevention. A matrix of dropout prevention options has been assembled from both existing programs and from new program designs. General components of the plan include the following: (1) dropout retrieval activities; (2)…
3rd-generation MW/LWIR sensor engine for advanced tactical systems
NASA Astrophysics Data System (ADS)
King, Donald F.; Graham, Jason S.; Kennedy, Adam M.; Mullins, Richard N.; McQuitty, Jeffrey C.; Radford, William A.; Kostrzewa, Thomas J.; Patten, Elizabeth A.; McEwan, Thomas F.; Vodicka, James G.; Wootan, John J.
2008-04-01
Raytheon has developed a 3rd-Generation FLIR Sensor Engine (3GFSE) for advanced U.S. Army systems. The sensor engine is based around a compact, productized detector-dewar assembly incorporating a 640 x 480 staring dual-band (MW/LWIR) focal plane array (FPA) and a dual-aperture coldshield mechanism. The capability to switch the coldshield aperture and operate at either of two widely-varying f/#s will enable future multi-mode tactical systems to more fully exploit the many operational advantages offered by dual-band FPAs. RVS has previously demonstrated high-performance dual-band MW/LWIR FPAs in 640 x 480 and 1280 x 720 formats with 20 μm pitch. The 3GFSE includes compact electronics that operate the dual-band FPA and variable-aperture mechanism, and perform 14-bit analog-to-digital conversion of the FPA output video. Digital signal processing electronics perform "fixed" two-point non-uniformity correction (NUC) of the video from both bands and optional dynamic scene-based NUC; advanced enhancement processing of the output video is also supported. The dewar-electronics assembly measures approximately 4.75 x 2.25 x 1.75 inches. A compact, high-performance linear cooler and cooler electronics module provide the necessary FPA cooling over a military environmental temperature range. 3GFSE units are currently being assembled and integrated at RVS, with the first units planned for delivery to the US Army.
Real-Time Operation of the International Space Station
NASA Astrophysics Data System (ADS)
Suffredini, M. T.
2002-01-01
The International Space Station is on orbit and real-time operations are well underway. Along with the assembly challenges of building and operating the International Space Station , scientific activities are also underway. Flight control teams in three countries are working together as a team to plan, coordinate and command the systems on the International Space Station.Preparations are being made to add the additional International Partner elements including their operations teams and facilities. By October 2002, six Expedition crews will have lived on the International Space Station. Management of real-time operations has been key to these achievements. This includes the activities of ground teams in control centers around the world as well as the crew on orbit. Real-time planning is constantly challenged with balancing the requirements and setting the priorities for the assembly, maintenance, science and crew health functions on the International Space Station. It requires integrating the Shuttle, Soyuz and Progress requirements with the Station. It is also necessary to be able to respond in case of on-orbit anomalies and to set plans and commands in place to ensure the continues safe operation of the Station. Bringing together the International Partner operations teams has been challenging and intensely rewarding. Utilization of the assets of each partner has resulted in efficient solutions to problems. This paper will describe the management of the major real-time operations processes, significant achievements, and future challenges.
CHIMAERA System for Cloud Retrievals v 6.0.85
NASA Technical Reports Server (NTRS)
Wind, Galina; Platnick, Steven; Meyer, Kerry; Amarasinghe, Nandana; Marchant, Benjamin; Arnold, Tom; King, Michael D.
2015-01-01
Organizers of the MODIS-VIIRS Science Team Meeting, held May 18-22, 2015 in Silver Spring, MD plan to post the presentations and posters to the NASA MODIS website: http:modis.gsfc.nasa.govsci_teammeetings201505index.php. The MODIS Science Team Meeting is held twice a year, so that the members of the science team may assemble and discuss data they have collected, ideas they have formed, and future issues that apply to the MODIS Mission.
Medical Isotope Production Analyses In KIPT Neutron Source Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Talamo, Alberto; Gohar, Yousry
Medical isotope production analyses in Kharkov Institute of Physics and Technology (KIPT) neutron source facility were performed to include the details of the irradiation cassette and the self-shielding effect. An updated detailed model of the facility was used for the analyses. The facility consists of an accelerator-driven system (ADS), which has a subcritical assembly using low-enriched uranium fuel elements with a beryllium-graphite reflector. The beryllium assemblies of the reflector have the same outer geometry as the fuel elements, which permits loading the subcritical assembly with different number of fuel elements without impacting the reflector performance. The subcritical assembly is drivenmore » by an external neutron source generated from the interaction of 100-kW electron beam with a tungsten target. The facility construction was completed at the end of 2015, and it is planned to start the operation during the year of 2016. It is the first ADS in the world, which has a coolant system for removing the generated fission power. Argonne National Laboratory has developed the design concept and performed extensive design analyses for the facility including its utilization for the production of different radioactive medical isotopes. 99Mo is the parent isotope of 99mTc, which is the most commonly used medical radioactive isotope. Detailed analyses were performed to define the optimal sample irradiation location and the generated activity, for several radioactive medical isotopes, as a function of the irradiation time.« less
2012-07-02
CAPE CANAVERAL, Fla. – NASA astronaut Rex Walheim, far right, addresses an participants during a NASA social question and answer session. The group is assembled in Kennedy Space Center's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. At the podium is Trent Perrotto of NASA Public Affairs. Joining Perrotto on stage, from the left, are Mark Geyer, Orion program manager David Beaman, NASA Space Launch System spacecraft and payload integration manager Pepper Phillips, program manager for NASA's Ground Systems Development and Operations and Walheim. The tweeters will share their experiences with followers through the social networking site Twitter. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. NASA's Michoud Assembly Facility in New Orleans built the crew module pressure vessel. The Orion production team will prepare the module for flight by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion Photo credit: NASA/Kim Shiflett
2012-07-02
CAPE CANAVERAL, Fla. – Trent Perrotto of NASA Public Affairs addresses an audience of participants during a NASA social question and answer session. The group is assembled in Kennedy Space Center's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Joining Perrotto on stage, from the left, are Mark Geyer, Orion program manager David Beaman, NASA Space Launch System spacecraft and payload integration manager Pepper Phillips, program manager for NASA's Ground Systems Development and Operations and NASA astronaut Rex Walheim. The tweeters will share their experiences with followers through the social networking site Twitter. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. NASA's Michoud Assembly Facility in New Orleans built the crew module pressure vessel. The Orion production team will prepare the module for flight by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion Photo credit: NASA/Kim Shiflett
2012-07-02
CAPE CANAVERAL, Fla. – Trent Perrotto of NASA Public Affairs addresses an audience of participants during a NASA social question and answer session. The group is assembled in Kennedy Space Center's Operations and Checkout Building high bay for an event marking the arrival of NASA's first space-bound Orion capsule in Florida. Joining Perrotto on stage, from the left, are Mark Geyer, Orion program manager David Beaman, NASA Space Launch System spacecraft and payload integration manager Pepper Phillips, program manager for NASA's Ground Systems Development and Operations and NASA astronaut Rex Walheim. The tweeters will share their experiences with followers through the social networking site Twitter. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. NASA's Michoud Assembly Facility in New Orleans built the crew module pressure vessel. The Orion production team will prepare the module for flight by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion Photo credit: NASA/Kim Shiflett
Lageos assembly operation plan
NASA Technical Reports Server (NTRS)
Brueger, J.
1975-01-01
Guidelines and constraints procedures for LAGEOS assembly, operation, and design performance are given. Special attention was given to thermal, optical, and dynamic analysis and testing. The operation procedures illustrate the interrelation and sequence of tasks in a flow diagram. The diagram also includes quality assurance functions for verification of operation tasks.
NASA Technical Reports Server (NTRS)
Martinko, E. A. (Principal Investigator); Caron, L. M.; Stewart, D. S.
1984-01-01
Data bases and information systems developed and maintained by state agencies to support planning and management of environmental and nutural resources were inventoried for all 50 states, Puerto Rico, and U.S. Virgin Islands. The information obtained is assembled into a computerized data base catalog which is throughly cross-referecence. Retrieval is possible by code, state, data base name, data base acronym, agency, computer, GIS capability, language, specialized software, data category name, geograhic reference, data sources, and level of reliability. The 324 automated data bases identified are described.
NASA Technical Reports Server (NTRS)
1986-01-01
With regards to technical performance, the project is running according to plan. An increase in total cost outlay was required. The new Dornier Systems schedule projects ROSAT launch readiness for April 27, 1988. However, as a result of the Challenger accident, no binding launch date has been received from NASA. The thirteenth status review was conducted at the prime contractor in March, 1986. Assembly of the FM mirror system has been interrupted due to irregularities in the gold damping; in addition, mission operation and simulator development are effected by understaffing. Postponements have been announced in the data transmission and components acquisition subsystems.
NASA's Space Launch System Takes Shape
NASA Technical Reports Server (NTRS)
Askins, Bruce R.; Robinson, Kimberly F.
2017-01-01
Significant hardware and software for NASA's Space Launch System (SLS) began rolling off assembly lines in 2016, setting the stage for critical testing in 2017 and the launch of new capability for deep-space human exploration. (Figure 1) At NASA's Michoud Assembly Facility (MAF) near New Orleans, LA, full-scale test articles are being joined by flight hardware. Structural test stands are nearing completion at NASA's Marshall Space Flight Center (MSFC), Huntsville, AL. An SLS booster solid rocket motor underwent test firing, while flight motor segments were cast. An RS-25 and Engine Control Unit (ECU) for early SLS flights were tested at NASA's Stennis Space Center (SSC). The upper stage for the first flight was completed, and NASA completed Preliminary Design Review (PDR) for a new, powerful upper stage. The pace of production and testing is expected to increase in 2017. This paper will discuss the technical and programmatic highlights and challenges of 2016 and look ahead to plans for 2017.
NASA Lewis Propulsion Systems Laboratory Customer Guide Manual
NASA Technical Reports Server (NTRS)
Soeder, Ronald H.
1994-01-01
This manual describes the Propulsion Systems Laboratory (PSL) at NASA Lewis Research Center. The PSL complex supports two large engine test cells (PSL-3 and PSL-4) that are capable of providing flight simulation to altitudes of 70,000 ft. Facility variables at the engine or test-article inlet, such as pressure, temperature, and Mach number (up to 3.0 for PSL-3 and up to 6.0 planned for PSL-4), are discussed. Support systems such as the heated and cooled combustion air systems; the altitude exhaust system; the hydraulic system; the nitrogen, oxygen, and hydrogen systems; hydrogen burners; rotating screen assemblies; the engine exhaust gas-sampling system; the infrared imaging system; and single- and multiple-axis thrust stands are addressed. Facility safety procedures are also stated.
EPA is taking final action to approve a revision to the Antelope Valley Air Quality Management District (AVAQMD) portion of the California SIP concerning the emissions of volatile organic compounds (VOCs) from motor vehicle assembly coating operations.
4. PROPOSED C1 ASSEMBLY AND TESTING FACILITIES FOR THE ORDINANCE ...
4. PROPOSED C-1 ASSEMBLY AND TESTING FACILITIES FOR THE ORDINANCE GUIDED MISSILE CENTER AT REDSTONE ARSENAL, NEAR THE SOUTH END OF MADKIN MOUNTAIN. OCTOBER 1950, HANNES LUEHRSEN COLLECTION, MSFC MASTER PLANNING OFFICE. - Marshall Space Flight Center, East Test Area, Dodd Road, Huntsville, Madison County, AL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Higashiura, Akifumi, E-mail: hgsur-a@protein.osaka-u.ac.jp; Yamashita, Eiki; Yoshimura, Masato
2016-07-27
Beamline BL44XU at SPring-8 is operated by the Institute for Protein Research of Osaka University. The beamline is designed for X-ray crystallography of large biological macromolecular assemblies. Here we show its detailed performances, results, and the ongoing upgrade plans.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-22
... announced below concerns Cooperative Agreement on Occupational Health with the World Health Organization (WHO): Implementing World Health Assembly Resolution 60.26 Global Plan of Action for Workers Health... Occupational Health with the World Health Organization (WHO): Implementing World Health Assembly Resolution 60...
Undersea applications of dexterous robotics
NASA Technical Reports Server (NTRS)
Gittleman, Mark M.
1994-01-01
The revolution and application of dexterous robotics in the undersea energy production industry and how this mature technology has affected planned SSF dexterous robotic tasks are examined. Undersea telerobotics, or Remotely Operated Vehicles (ROV's), have evolved in design and use since the mid-1970s. Originally developed to replace commercial divers for both planned and unplanned tasks, they are now most commonly used to perform planned robotic tasks in all phases of assembly, inspection, and maintenance of undersea structures and installations. To accomplish these tasks, the worksites, the tasks themselves, and the tools are now engineered with both the telerobot's and the diver's capabilities in mind. In many cases, this planning has permitted a reduction in telerobot system complexity and cost. The philosophies and design practices that have resulted in the successful incorporation of telerobotics into the highly competitive and cost conscious offshore production industry have been largely ignored in the space community. Cases where these philosophies have been adopted or may be successfully adopted in the near future are explored.
Electrolytic oxide reduction system
Wiedmeyer, Stanley G; Barnes, Laurel A; Williamson, Mark A; Willit, James L; Berger, John F
2015-04-28
An electrolytic oxide reduction system according to a non-limiting embodiment of the present invention may include a plurality of anode assemblies, a plurality of cathode assemblies, and a lift system configured to engage the anode and cathode assemblies. The cathode assemblies may be alternately arranged with the anode assemblies such that each cathode assembly is flanked by two anode assemblies. The lift system may be configured to selectively engage the anode and cathode assemblies so as to allow the simultaneous lifting of any combination of the anode and cathode assemblies (whether adjacent or non-adjacent).
NASA Technical Reports Server (NTRS)
1972-01-01
A cost study comparing flat conductor cable (FCC) with small-gage wire (SGW) and conventional round conductor cable (RCC) is presented. This study was based on a vehicle wiring system consisting of 110,000 ft of conventional RCC equally divided between AWG sizes 20,22, and 24 using MIL-W-81044-type wire and MIL-C-26500 circular connectors. Basic cost data were developed on a similar-sized commercial jet airplane wiring system on a previous company R&D program in which advanced wiring techniques were carried through equivalent installations on an airplane mockup; and on data developed on typical average bundles during this program. Various cost elements included were engineering labor, operations (manufacturing) labor, material costs, and cost impact on payload. Engineering labor includes design, wiring system integration, wiring diagrams and cable assembly drawings, wire installations, and other related supporting functions such as the electronic data processing for the wiring. Operations labor includes mockup, tooling and production planning, fabrication, assembly, installation, and quality control cost impact on payload is the conversion of wiring system weight variations through use of different wiring concepts to program payload benefits in terms of dollars.
Research needs in transportation planning and management.
DOT National Transportation Integrated Search
1977-01-01
In 1974, legislation enacted by the General Assembly to expand the responsibilities and duties of the former Virginia Department of Highways, with the main new assignment being in the area of planning. The agency was now designated the Virginia Depar...
VERS: a virtual environment for reconstructive surgery planning
NASA Astrophysics Data System (ADS)
Montgomery, Kevin N.
1997-05-01
The virtual environment for reconstructive surgery (VERS) project at the NASA Ames Biocomputation Center is applying virtual reality technology to aid surgeons in planning surgeries. We are working with a craniofacial surgeon at Stanford to assemble and visualize the bone structure of patients requiring reconstructive surgery either through developmental abnormalities or trauma. This project is an extension of our previous work in 3D reconstruction, mesh generation, and immersive visualization. The current VR system, consisting of an SGI Onyx RE2, FakeSpace BOOM and ImmersiveWorkbench, Virtual Technologies CyberGlove and Ascension Technologies tracker, is currently in development and has already been used to visualize defects preoperatively. In the near future it will be used to more fully plan the surgery and compute the projected result to soft tissue structure. This paper presents the work in progress and details the production of a high-performance, collaborative, and networked virtual environment.
NASA Technical Reports Server (NTRS)
1985-01-01
An overview of the second quarter 1985 development of the X-ray satellite project is presented. It is shown that the project is proceeding according to plan and that the projected launch date of September 9, 1987 is on schedule. An overview of the work completed and underway on the systems, subsystems, payload, assembly, ground equipment and interfaces is presented. Problem areas shown include cost increases in the area of focal instrumentation, the star sensor light scattering requirements, and postponements in the data transmission subsystems.
NASA space station automation: AI-based technology review
NASA Technical Reports Server (NTRS)
Firschein, O.; Georgeff, M. P.; Park, W.; Neumann, P.; Kautz, W. H.; Levitt, K. N.; Rom, R. J.; Poggio, A. A.
1985-01-01
Research and Development projects in automation for the Space Station are discussed. Artificial Intelligence (AI) based automation technologies are planned to enhance crew safety through reduced need for EVA, increase crew productivity through the reduction of routine operations, increase space station autonomy, and augment space station capability through the use of teleoperation and robotics. AI technology will also be developed for the servicing of satellites at the Space Station, system monitoring and diagnosis, space manufacturing, and the assembly of large space structures.
U.S. Space Station platform - Configuration technology for customer servicing
NASA Technical Reports Server (NTRS)
Dezio, Joseph A.; Walton, Barbara A.
1987-01-01
Features of the Space Station coorbiting and polar orbiting platforms (COP and POP, respectively) are described that will allow them to be configured optimally to meet mission requirements and to be assembled, serviced, and modified on-orbit. Both of these platforms were designed to permit servicing at the Shuttle using the remote manipulator system with teleoperated end effectors; EVA was planned as a backup and for unplanned payload failure modes. Station-based servicing is discussed as well as expendable launch vehicle-based servicing concepts.
2011-11-01
considered semi-improved and mowed four times a year. The site is treated twice a year with herbicides to control invasive pest plants: diffuse...According to the Fairchild AFB Pest Management Plan, contractors mix all pesticide and herbicide chemicals off-base (92 CES/CEAN, 2007...1) Armed Forces Reserve Center (AFRC) – A main building approximately 80,900 square feet (s.f.) for office space, assembly hall with kitchen
Cabana Multi-User Spaceport Tour of KSC
2017-02-17
Tom Engler, director of Center Planning and Development at NASA's Kennedy Space Center, speaks to members of the news media on the balcony of Operations Support Building II describing the site's transition from a primarily government-only facility to a premier, multi-user spaceport. In the background is the Vehicle Assembly Building (VAB). Modifications were recently completed in the VAB where new work platforms were installed to support processing of NASA's Space Launch System rocket designed to send the Orion spacecraft on missions beyond low-Earth orbit.
Planning Support for Maintenance and Overhaul of Gun Weapon Systems
1981-05-01
13 (shielded twin) gun mounts are targeted to receive ORDALTs 9335 and 9409. Sixty-seven ship hulls are involved in the program, for a total of 147...gun mounts (excluding four training mounts ). Seventy-three Mod 0 and seventy-four Mod 13 gun mounts are included in the program, for an estimated total ...of gun mounts included in the GWSIP. Each mount will receive one amplifier ORDALT, for a. a total of 147, and two upgraded oscillating assemblies
NASA Technical Reports Server (NTRS)
1979-01-01
Program elements of the power module (PM) system, are identified, structured, and defined according to the planned work breakdown structure. Efforts required to design, develop, manufacture, test, checkout, launch and operate a protoflight assembled 25 kW, 50 kW and 100 kW PM include the preparation and delivery of related software, government furnished equipment, space support equipment, ground support equipment, launch site verification software, orbital verification software, and all related data items.
Criticality Safety Evaluation of the LLNL Inherently Safe Subcritical Assembly (ISSA)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Percher, Catherine
2012-06-19
The LLNL Nuclear Criticality Safety Division has developed a training center to illustrate criticality safety and reactor physics concepts through hands-on experimental training. The experimental assembly, the Inherently Safe Subcritical Assembly (ISSA), uses surplus highly enriched research reactor fuel configured in a water tank. The training activities will be conducted by LLNL following the requirements of an Integration Work Sheet (IWS) and associated Safety Plan. Students will be allowed to handle the fissile material under the supervision of LLNL instructors. This report provides the technical criticality safety basis for instructional operations with the ISSA experimental assembly.
Housing a Raspberry Pi Connected AS-1 Seismometer in a Solar-Paneled Shed
NASA Astrophysics Data System (ADS)
Marton, F.; Tokman, T. L.; Echreshzadeh, M.; Palaric, K. D.; Filippone, N. V.; Sivo, J.
2016-12-01
Last year, students working on the SeismoSTEM project at Bergen Community College successfully manufactured and assembled an AS-1 seismometer1. However, issues students encountered were not knowing where to place the TC-1 and AS-1 seismometers, nor how to configure the instruments with a computer for monitoring and measuring earthquakes. Our solution was to purchase a Raspberry Pi 3 model B, which has four USB ports and a Wi-Fi adapter. We then installed the Raspbian operating system that can run jAmaSeis, which allows for the collection and analysis of seismic data. In terms of the shed that was constructed last summer2, we installed roof shingles, as well as a ventilation system to prevent overheating. The seismometers will then be placed on a concrete slab. In the future, we plan on applying a wood varnish around the exterior of the shed, as well as gravel around the shed for water drainage as well as to make it more visually appealing. Moreover, we plan on mounting a 170-W solar panel on the roof to charge a 12-V deep cycle marine battery, which will provide electricity to the system. References: 1Tokman, T.L. et al., What's shaking? Manufacturing & assembling an AS-1 educational seismometer for undergraduate stem research, Geological Society of America Abstracts with Programs. Vol. 47, No. 7, p.524, 2015. 2Palaric, K.D., et al., Constructing a solar-powered seismic station for educational seismometers, Geological Society of America Abstracts with Programs. Vol. 47, No. 7, p.524, 2015.
Solar Dynamics Observatory On-Orbit Jitter Testing, Analysis, and Mitigation Plans
NASA Technical Reports Server (NTRS)
Liu, Kuo-Chia (Alice); Blaurock, Carl A.; Bourkland, Kristin L.; Morgenstern, Wendy M.; Maghami, Peiman G.
2011-01-01
The Solar Dynamics Observatory (SDO) was designed to understand the Sun and the Sun s influence on Earth. SDO was launched on February 11, 2010 carrying three scientific instruments: the Atmospheric Imaging Assembly (AIA), the Helioseismic and Magnetic Imager (HMI), and the Extreme Ultraviolet Variability Experiment (EVE). Both AIA and HMI are sensitive to high frequency pointing perturbations and have sub-arcsecond level line-of-sight (LOS) jitter requirements. Extensive modeling and analysis efforts were directed in estimating the amount of jitter disturbing the science instruments. To verify the disturbance models and to validate the jitter performance prior to launch, many jitter-critical components and subassemblies were tested either by the mechanism vendors or at the NASA Goddard Space Flight Center (GSFC). Although detailed analysis and assembly level tests were performed to obtain good jitter predictions, there were still several sources of uncertainties in the system. The structural finite element model did not have all the modes correlated to test data at high frequencies (greater than 50 Hz). The performance of the instrument stabilization system was not known exactly but was expected to be close to the analytical model. A true disturbance-to-LOS observatory level test was not available due to the tight schedule of the flight spacecraft, the cost in time and manpower, difficulties in creating gravity negation systems, and risks of damaging flight hardware. To protect the observatory jitter performance against model uncertainties, the SDO jitter team devised several on-orbit jitter reduction plans in addition to reserve margins on analysis results. Since some of these plans severely restricted the capabilities of several spacecraft components (e.g. wheels and High Gain Antennas), the SDO team performed on-orbit jitter tests to determine which jitter reduction plans, if any, were necessary to satisfy science LOS jitter requirements. The SDO on-orbit jitter tests were designed to satisfy the following four objectives: 1. Determine the acceptable reaction wheel operational speed range during Science Mode. 2. Determine HGA algorithm jitter parameters (number of stagger steps and enable/disable no-steprequests). 3. Determine acceptable EVE instrument filter wheels spin rates. 4. Determine if AIA instrument filter wheels excite the first AIA telescope structural mode. This paper provides detailed information on the SDO wheel jitter test plan, shows on-orbit jitter measurements and how ground predictions compare to those measurements, and describes the final jitter mitigation plan executed on SDO.
Modeling Energy Efficiency As A Green Logistics Component In Vehicle Assembly Line
NASA Astrophysics Data System (ADS)
Oumer, Abduaziz; Mekbib Atnaw, Samson; Kie Cheng, Jack; Singh, Lakveer
2016-11-01
This paper uses System Dynamics (SD) simulation to investigate the concept green logistics in terms of energy efficiency in automotive industry. The car manufacturing industry is considered to be one of the highest energy consuming industries. An efficient decision making model is proposed that capture the impacts of strategic decisions on energy consumption and environmental sustainability. The sources of energy considered in this research are electricity and fuel; which are the two main types of energy sources used in a typical vehicle assembly plant. The model depicts the performance measurement for process- specific energy measures of painting, welding, and assembling processes. SD is the chosen simulation method and the main green logistics issues considered are Carbon Dioxide (CO2) emission and energy utilization. The model will assist decision makers acquire an in-depth understanding of relationship between high level planning and low level operation activities on production, environmental impacts and costs associated. The results of the SD model signify the existence of positive trade-offs between green practices of energy efficiency and the reduction of CO2 emission.
Venezuela: from doctrine to dialogue to participation in the processes of regional development.
Allor, D J
1984-01-01
The growing toward decentralization and democratization of development planning in Venezuela was discussed. Venezuela has a long tradition of rule by a strong centralized authority. Currently, the Office of the President is vested with considerable power, despite the existence of an elected legislator and an independent judiciary. The president rules by decree. State legislatures are elected, but governors of the states are appointed by the president. There are also elected municipal councils. Both state and municipal governments are almost fully dependent on the federal government for both their operating and capital investment budgets. Development programs are administered through 2 systems. Specific programs are administered by almost 100 different institutes and enterprises. The activities of these various programs are coordinated by administrative bodies at the state and federal level. The 2nd administrative system operates at the regional and federal levels. The administrative body at the federal level is the Central Office for Coordination and Planning and was established by Presidential Decree in 1958. This body prepares and coordinates all national development plans. The administrative bodies at the regional level are the Regional Organizations for Development. These bodies were created in specific regions through a series of legislative acts commencing in 1969 and continuing into the present. The development of these regional bodies represented a 1st step toward decentralization. Decree 478, promulgated in 1980, further promoted the decentalization of developmental planning. The decree established a series of assemblies and councils at various levels. A National Council of Regional Development was created at the federal level, and a Regional Council of Development was established at the regional level. At the state level an Assembly of Participation was organized, and at the municipal level a Committee of Citizen Participation was established. Neighborhood associations were mentioned in the decree, but their role was not formalized. This series of newly established bodies plays a role in both advisory and administrative processes. The advisory process begins at the lowest level, and local concerns are expressed upward through the hierarchy. The administrative process flows in the opposite direction. Participation remains highly formalized and is restricted to the participation of recognized leaders and organizations. For example, members of the Assembly of Participation include the state governor, representatives of municipal councils, and representatives of various industrial and commercial organizations. Despite the formal nature of the participation, the 1980 Decree clearly exhibited the trend toward decentralization predicted by John Freeman in his analysis of Venezuelan political structure and published in a book entitled "venezuela: From doctrine to Dialogue." Increased pressure will now be exerted for broader community participation in the development process, and eventually development planning will focus on the equitable distribution of development benefits rather than on the maximization of economic growth.
NASA Astrophysics Data System (ADS)
Chen, Ti; Wen, Hao
2018-06-01
This paper presents a distributed control law with disturbance observer for the autonomous assembly of a fleet of flexible spacecraft to construct a large flexible space structure. The fleet of flexible spacecraft is driven to the pre-assembly configuration firstly, and then to the desired assembly configuration. A distributed assembly control law with disturbance observer is proposed by treating the flexible dynamics as disturbances acting on the rigid motion of the flexible spacecraft. Theoretical analysis shows that the control law can actuate the fleet to the desired configuration. Moreover, the collision avoidance between the members is also considered in the process from initial configuration to pre-assembly configuration. Finally, a numerical example is presented to verify the feasibility of proposed mission planning and the effectiveness of control law.
ERIC Educational Resources Information Center
Illinois Inst. for Environmental Quality, Chicago.
This master plan for environmental and energy higher education in Illinois is a direct result of a mandate from the Illinois General Assembly. To prepare students to confront our nation's environmental problems, each university will submit a management and development plan, designed to preserve existing environmental values and provide…
Guatemalan Counterinsurgency Strategy
1989-04-07
Institucional 84 Campaign Plan . 25 Estabilidad Nacional 85 Campaign Plan. .... 26 IV. CONCLUSIONS ........ .................. 29 V. THE FUTURE...troops, the Civilian Population and a program of information for the country’s and international media. 24 3. Reencuentro Institucional 84 Campaian...Plan Reencuentro Institucional objectives were: o To implement electoral laws and the election of the Constituent Assembly. o To develop reconstruction
Options for improving the coordination of transportation and land use planning in Virginia.
DOT National Transportation Integrated Search
2004-01-01
Virginia's 2003 General Assembly directed the Secretary of Transportation to (1) assess best practices used by other states to coordinate transportation and land use planning, (2) review current state efforts to provide technical assistance to local ...
Overview of materials processing in space activity at Marshall Space Flight Center
NASA Technical Reports Server (NTRS)
Williams, J. R.; Chassay, R. P.; Moore, W. W.; Ruff, R. C.; Yates, I. C.
1984-01-01
An overview of activities involving the Space Transportation System (STS), now in the operational phase, and results of some of the current space experiments, as well as future research opportunities in microgravity environment, are presented. The experiments of the Materials Processing in Space Program flown on the STS, such as bioseparation processes, isoelectric focusing, solidification and crystal growth processes, containerless processes, and the Materials Experiment Assembly experiments are discussed. Special consideration is given to the experiments to be flown aboard the Spacelab 3 module, the Fluids Experiments System, and the Vapor Crystal Growth System. Ground-based test facilities and planned space research facilities, as well as the nature of the commercialization activities, are briefly explained.
Symposium on Space Industrialization, Huntsville, Ala., May 26, 27, 1976, Proceedings
NASA Technical Reports Server (NTRS)
1976-01-01
Space habitats are considered, with attention given the evolution of space station systems, space station habitability, space settlement planning methodology, and orbital assembly. Various aspects of the Space Transportation System are discussed, including Shuttle booster/propulsion growth concept, advanced earth orbital transportation systems technology, single-stage-to-orbit vehicles and aeromaneuvering orbit transfer vehicles. Materials processing in space is examined, with emphasis on biological materials, metallurgical materials, the uses of space ultrahigh vacuum, and extraterrestrial mining and industrial processing. Solar space power is investigated, with attention given the potential of satellite solar power stations, thermal engine power satellites and microwave power transmission to earth. Individual items are announced in this issue.
Intelligent Elements for the ISHM Testbed and Prototypes (ITP) Project
NASA Technical Reports Server (NTRS)
Maul, William A.; Park, Han; Schwabacher, Mark; Watson, Michael; Mackey, Ryan; Fijany, Amir; Trevino, Luis; Weir, John
2005-01-01
Deep-space manned missions will require advanced automated health assessment capabilities. Requirements such as in-space assembly, long dormant periods and limited accessibility during flight, present significant challenges that should be addressed through Integrated System Health Management (ISHM). The ISHM approach will provide safety and reliability coverage for a complete system over its entire life cycle by determining and integrating health status and performance information from the subsystem and component levels. This paper will focus on the potential advanced diagnostic elements that will provide intelligent assessment of the subsystem health and the planned implementation of these elements in the ISHM Testbed and Prototypes (ITP) Project under the NASA Exploration Systems Research and Technology program.
Design scheme for optical manufacturing support system of TMT M3 prototype
NASA Astrophysics Data System (ADS)
Hu, Haifei; Luo, Xiao
2014-09-01
Thirty Meter Telescope's Tertiary Mirror Cell Assembly (TMTM3-CA) will be manufactured in Changchun Institute of Optics, Fine Mechanics and Physics (CIOMP). To reduce the risk of fabricating TMTM3, a prototype made of Zerodur with a d/t ratio of 72 is planned to be polished. Here the focus is on the design scheme of the prototype's optical manufacturing support system. Firstly the number of support points was estimated, then structural design scheme for equal-force polishing support system are drawn, and finally layout optimization of support points was carried out. As its high performance and efficiency, the work will be beneficial to manufacturing large thin mirrors.
Letter Proposing Candidates for the First UN Assembly. Teaching with Documents.
ERIC Educational Resources Information Center
Haverkamp, Beth; Schamel, Wynell
1994-01-01
Presents a secondary school lesson plan on the selection of delegates to the first United Nations Assembly meeting. Discusses the esteem of Eleanor Roosevelt at that time and how President Truman requested that she be one of five U.S. representatives. Includes two primary source letters and instructional procedures. (CFR)
ERIC Educational Resources Information Center
Seth, Anupam
2009-01-01
Production planning and scheduling for printed circuit, board assembly has so far defied standard operations research approaches due to the size and complexity of the underlying problems, resulting in unexploited automation flexibility. In this thesis, the increasingly popular collect-and-place machine configuration is studied and the assembly…
Celotta, Robert J; Balakirsky, Stephen B; Fein, Aaron P; Hess, Frank M; Rutter, Gregory M; Stroscio, Joseph A
2014-12-01
A major goal of nanotechnology is to develop the capability to arrange matter at will by placing individual atoms at desired locations in a predetermined configuration to build a nanostructure with specific properties or function. The scanning tunneling microscope has demonstrated the ability to arrange the basic building blocks of matter, single atoms, in two-dimensional configurations. An array of various nanostructures has been assembled, which display the quantum mechanics of quantum confined geometries. The level of human interaction needed to physically locate the atom and bring it to the desired location limits this atom assembly technology. Here we report the use of autonomous atom assembly via path planning technology; this allows atomically perfect nanostructures to be assembled without the need for human intervention, resulting in precise constructions in shorter times. We demonstrate autonomous assembly by assembling various quantum confinement geometries using atoms and molecules and describe the benefits of this approach.
An overview of the EASE/ACCESS space construction demonstration
NASA Technical Reports Server (NTRS)
Levin, George M.; Ross, Jerry L.; Spring, Sherwood C.
1988-01-01
Consideration is given to the development of the Experimental Assembly of Structures in EVA/Assembly Concept for Construction of Erectable Space Structures (EASE/ACCESS) space construction demonstration, which was performed during Space Shuttle mission 61-B. The mission equipment is described and illustrated and the EASE/ACCESS mission management structure is outlined. Simulations of the assembly and disassembly in the NASA neutral buoyancy simulators were used to test the mission plans. In addition, EVA training and crew performance for the mission are discussed.
International Space Station Carbon Dioxide Removal Assembly (ISS CDRA) Concepts and Advancements
NASA Technical Reports Server (NTRS)
ElSherif, Dina; Knox, James C.
2005-01-01
An important aspect of air revitalization for life support in spacecraft is the removal of carbon dioxide from cabin air. Several types of carbon dioxide removal systems are in use in spacecraft life support. These systems rely on various removal techniques that employ different architectures and media for scrubbing CO2, such as permeable membranes, liquid amine, adsorbents, and absorbents. Sorbent systems have been used since the first manned missions. The current state of key technology is the existing International Space Station (ISS) Carbon Dioxide Removal Assembly (CDRA), a system that selectively removes carbon dioxide from the cabin atmosphere. The CDRA system was launched aboard UF-2 in February 2001 and resides in the U.S. Destiny Laboratory module. During the past four years, the CDRA system has operated with varying degrees of success. There have been several approaches to troubleshooting the CDRA system aimed at developing work-around solutions that would minimize the impact on astronaut time required to implement interim solutions. The paper discusses some of the short-term fixes applied to promote hardware life and restore functionality, as well as long-term plans and solutions for improving operability and reliability. The CDRA is a critical piece of life support equipment in the air revitalization system of the ISS, and is demonstrated technology that may ultimately prove well-suited for use in lunar or Mars base, and Mars transit life support applications.
2010-05-01
23 Task Execution Plan 34 – Temperature Testing of Pyridostigmine Bromide (PB) .......... 23 KEY RESEARCH ACCOMPLISHMENTS...29, 2010. Staff was assembled and materials have been ordered. Task Execution Plan (TEP) 0034 – Temperature Testing of Pyridostigmine Bromide
Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan
NASA Technical Reports Server (NTRS)
Zeidler, Janet
1999-01-01
Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.
Prestige Planning and the Welsh Language: Marketing, the Consumer-Citizen and Language Behaviour
ERIC Educational Resources Information Center
Chriost, Diarmait Mac Giolla
2006-01-01
This paper comprises a brief examination of the approach taken by the Welsh Language Board, as the principal language policy and planning body in Wales, with regard to aspects of prestige planning and the Welsh language. It describes how devolution and the recent, and first ever, national review by the Welsh Assembly Government of Welsh language…
Anode-cathode power distribution systems and methods of using the same for electrochemical reduction
Koehl, Eugene R; Barnes, Laurel A; Wiedmeyer, Stanley G; Williamson, Mark A; Willit, James L
2014-01-28
Power distribution systems are useable in electrolytic reduction systems and include several cathode and anode assembly electrical contacts that permit flexible modular assembly numbers and placement in standardized connection configurations. Electrical contacts may be arranged at any position where assembly contact is desired. Electrical power may be provided via power cables attached to seating assemblies of the electrical contacts. Cathode and anode assembly electrical contacts may provide electrical power at any desired levels. Pairs of anode and cathode assembly electrical contacts may provide equal and opposite electrical power; different cathode assembly electrical contacts may provide different levels of electrical power to a same or different modular cathode assembly. Electrical systems may be used with an electrolyte container into which the modular cathode and anode assemblies extend and are supported above, with the modular cathode and anode assemblies mechanically and electrically connecting to the respective contacts in power distribution systems.
SU-E-T-154: Establishment and Implement of 3D Image Guided Brachytherapy Planning System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jiang, S; Zhao, S; Chen, Y
2014-06-01
Purpose: Cannot observe the dose intuitionally is a limitation of the existing 2D pre-implantation dose planning. Meanwhile, a navigation module is essential to improve the accuracy and efficiency of the implantation. Hence a 3D Image Guided Brachytherapy Planning System conducting dose planning and intra-operative navigation based on 3D multi-organs reconstruction is developed. Methods: Multi-organs including the tumor are reconstructed in one sweep of all the segmented images using the multiorgans reconstruction method. The reconstructed organs group establishs a three-dimensional visualized operative environment. The 3D dose maps of the three-dimentional conformal localized dose planning are calculated with Monte Carlo method whilemore » the corresponding isodose lines and isodose surfaces are displayed in a stereo view. The real-time intra-operative navigation is based on an electromagnetic tracking system (ETS) and the fusion between MRI and ultrasound images. Applying Least Square Method, the coordinate registration between 3D models and patient is realized by the ETS which is calibrated by a laser tracker. The system is validated by working on eight patients with prostate cancer. The navigation has passed the precision measurement in the laboratory. Results: The traditional marching cubes (MC) method reconstructs one organ at one time and assembles them together. Compared to MC, presented multi-organs reconstruction method has superiorities in reserving the integrality and connectivity of reconstructed organs. The 3D conformal localized dose planning, realizing the 'exfoliation display' of different isodose surfaces, helps make sure the dose distribution has encompassed the nidus and avoid the injury of healthy tissues. During the navigation, surgeons could observe the coordinate of instruments real-timely employing the ETS. After the calibration, accuracy error of the needle position is less than 2.5mm according to the experiments. Conclusion: The speed and quality of 3D reconstruction, the efficiency in dose planning and accuracy in navigation all can be improved simultaneously.« less
Water management in Egypt for facing the future challenges
Omar, Mohie El Din M.; Moussa, Ahmed M.A.
2016-01-01
The current water shortage in Egypt is 13.5 Billion cubic meter per year (BCM/yr) and is expected to continuously increase. Currently, this water shortage is compensated by drainage reuse which consequently deteriorates the water quality. Therefore, this research was commenced with the objective of assessing different scenarios for 2025 using the Water Evaluation and Planning (WEAP) model and by implementing different water sufficiency measures. Field data were assembled and analyzed, and different planning alternatives were proposed and tested in order to design three future scenarios. The findings indicated that water shortage in 2025 would be 26 BCM/yr in case of continuation of current policies. Planning alternatives were proposed to the irrigation canals, land irrigation timing, aquatic weeds in waterways and sugarcane areas in old agricultural lands. Other measures were suggested to pumping rates of deep groundwater, sprinkler and drip irrigation systems in new agricultural lands. Further measures were also suggested to automatic daily surveying for distribution leak and managing the pressure effectively in the domestic and industrial water distribution systems. Finally, extra measures for water supply were proposed including raising the permitted withdrawal limit from deep groundwater and the Nubian aquifer and developing the desalination resource. The proposed planning alternatives would completely eliminate the water shortage in 2025. PMID:27222745
Water management in Egypt for facing the future challenges.
Omar, Mohie El Din M; Moussa, Ahmed M A
2016-05-01
The current water shortage in Egypt is 13.5 Billion cubic meter per year (BCM/yr) and is expected to continuously increase. Currently, this water shortage is compensated by drainage reuse which consequently deteriorates the water quality. Therefore, this research was commenced with the objective of assessing different scenarios for 2025 using the Water Evaluation and Planning (WEAP) model and by implementing different water sufficiency measures. Field data were assembled and analyzed, and different planning alternatives were proposed and tested in order to design three future scenarios. The findings indicated that water shortage in 2025 would be 26 BCM/yr in case of continuation of current policies. Planning alternatives were proposed to the irrigation canals, land irrigation timing, aquatic weeds in waterways and sugarcane areas in old agricultural lands. Other measures were suggested to pumping rates of deep groundwater, sprinkler and drip irrigation systems in new agricultural lands. Further measures were also suggested to automatic daily surveying for distribution leak and managing the pressure effectively in the domestic and industrial water distribution systems. Finally, extra measures for water supply were proposed including raising the permitted withdrawal limit from deep groundwater and the Nubian aquifer and developing the desalination resource. The proposed planning alternatives would completely eliminate the water shortage in 2025.
Recommendations to the Illinois General Assembly on Zoning for Community Residences.
ERIC Educational Resources Information Center
Illinois Planning Council on Developmental Disabilities, Springfield.
The Illinois General Assembly enacted the Community Residence Location Planning Act (CRLPA) to provide assistance to the state's 110 home rule municipalities to help bring their zoning ordinances into compliance with 1988 amendments to the U.S. Fair Housing Act. This report presents the results of this effort and offers recommendations to the…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schmitz, Roger William; Oh, Yunje
A heating assembly configured for use in mechanical testing at a scale of microns or less. The heating assembly includes a probe tip assembly configured for coupling with a transducer of the mechanical testing system. The probe tip assembly includes a probe tip heater system having a heating element, a probe tip coupled with the probe tip heater system, and a heater socket assembly. The heater socket assembly, in one example, includes a yoke and a heater interface that form a socket within the heater socket assembly. The probe tip heater system, coupled with the probe tip, is slidably receivedmore » and clamped within the socket.« less
Present status and future prospects of the JT-60SA project
NASA Astrophysics Data System (ADS)
Ishida, S.; Barabaschi, P.; Kamada, Y.
2014-10-01
The JT-60SA project has been implemented jointly by Europe and Japan since June 2007. After the disassembly of JT-60 from the torus hall had been completed in October 2012, the project achieved the major milestone of starting the tokamak's assembly at the JAEA Naka site in January 2013 following the completion of the cryostat base in Europe and its transport to Japan. Procurement and assembly activities for components such as the superconducting magnet, cryogenic system, power supply, vacuum vessel, divertor and cryostat are progressing on track towards the start of operation in March 2019. In preparation for exploitation, the JT-60SA Research Plan was issued in December 2011, and the research integration activities are addressing JT-60SA data management, validation and analysis tools. This paper overviews the latest evolution of the project in terms of construction and exploitation for JT-60SA.
Hollow Cathode Assembly Development for the HERMeS Hall Thruster
NASA Technical Reports Server (NTRS)
Sarver-Verhey, Timothy R.; Kamhawi, Hani; Goebel, Dan M.; Polk, James E.; Peterson, Peter Y.; Robinson, Dale A.
2016-01-01
To support the operation of the HERMeS 12.5 kW Hall Thruster for NASA's Asteroid Redirect Robotic Mission, hollow cathodes using emitters based on barium oxide impregnate and lanthanum hexaboride are being evaluated through wear-testing, performance characterization, plasma modeling, and assessment of system implementation concerns. This paper will present the development approach used to assess the cathode emitter options. A 2,000-hour wear-test of development model barium-oxide-based (BaO) hollow cathode is being performed as part of the development plan. The cathode was operated with an anode that simulates the HERMeS hall thruster operating environment. Cathode discharge performance has been stable with the device accumulating 740 hours at the time of this report. Cathode operation (i.e. discharge voltage and orifice temperature) was repeatable during period variation of discharge current and flow rate. The details of the cathode assembly operation during the wear-test will be presented.
Development of Urine Receptacle Assembly for the Crew Exploration Vehicle
NASA Technical Reports Server (NTRS)
Cibuzar, Branelle Rae; Thomas, Evan; Peterson, Laurie; Goforth, Johanna
2008-01-01
The Urine Receptacle Assembly (URA) initially was developed for Apollo as a primary means of urine collection. The aluminum housing with stainless steel honeycomb insert provided all male crewmembers with a non-invasive means of micturating into a urine capturing device and then venting to space. The performance of the URA was a substantial improvement over previous devices but its performance was not well understood. The Crew Exploration Vehicle (CEV) program is exploring the URA as a contingency liquid waste management system for the vehicle. URA improvements are required to meet CEV requirements, including: consumables minimization, flow performance, acceptable hygiene standards, crew comfort, and female crewmember capability. This paper presents the results of a historical review of URA performance during the Apollo program, recent URA performance tests on the reduced gravity aircraft flight under varying flow conditions, and a proposed development plan for the URA to meet CEV needs.
A prototype heat pipe heat exchanger for the capillary pumped loop flight experiment
NASA Technical Reports Server (NTRS)
Ku, Jentung; Yun, Seokgeun; Kroliczek, Edward J.
1992-01-01
A Capillary Pumped Two-Phase Heat Transport Loop (CAPL) Flight Experiment, currently planned for 1993, will provide microgravity verification of the prototype capillary pumped loop (CPL) thermal control system for EOS. CAPL employs a heat pipe heat exchanger (HPHX) to couple the condenser section of the CPL to the radiator assembly. A prototype HPHX consisting of a heat exchanger (HX), a header heat pipe (HHP), a spreader heat pipe (SHP), and a flow regulator has been designed and tested. The HX transmits heat from the CPL condenser to the HHP, while the HHP and SHP transport heat to the radiator assembly. The flow regulator controls flow distribution among multiple parallel HPHX's. Test results indicated that the prototype HPHX could transport up to 800 watts with an overall heat transfer coefficient of more than 6000 watts/sq m-deg C. Flow regulation among parallel HPHX's was also demonstrated.
Advanced Plasma Pyrolysis Assembly (PPA) Reactor and Process Development
NASA Technical Reports Server (NTRS)
Wheeler, Richard R., Jr.; Hadley, Neal M.; Dahl, Roger W.; Abney, Morgan B.; Greenwood, Zachary; Miller, Lee; Medlen, Amber
2012-01-01
Design and development of a second generation Plasma Pyrolysis Assembly (PPA) reactor is currently underway as part of NASA's Atmosphere Revitalization Resource Recovery effort. By recovering up to 75% of the hydrogen currently lost as methane in the Sabatier reactor effluent, the PPA helps to minimize life support resupply costs for extended duration missions. To date, second generation PPA development has demonstrated significant technology advancements over the first generation device by doubling the methane processing rate while, at the same time, more than halving the required power. One development area of particular interest to NASA system engineers is fouling of the PPA reactor with carbonaceous products. As a mitigation plan, NASA MSFC has explored the feasibility of using an oxidative plasma based upon metabolic CO2 to regenerate the reactor window and gas inlet ports. The results and implications of this testing are addressed along with the advanced PPA reactor development.
Host-regulated Hepatitis B Virus Capsid Assembly in a Mammalian Cell-free System.
Liu, Kuancheng; Hu, Jianming
2018-04-20
The hepatitis B virus (HBV) is an important global human pathogen and represents a major cause of hepatitis, liver cirrhosis and liver cancer. The HBV capsid is composed of multiple copies of a single viral protein, the capsid or core protein (HBc), plays multiple roles in the viral life cycle, and has emerged recently as a major target for developing antiviral therapies against HBV infection. Although several systems have been developed to study HBV capsid assembly, including heterologous overexpression systems like bacteria and insect cells, in vitro assembly using purified protein, and mammalian cell culture systems, the requirement for non-physiological concentrations of HBc and salts and the difficulty in manipulating host regulators of assembly presents major limitations for detailed studies on capsid assembly under physiologically relevant conditions. We have recently developed a mammalian cell-free system based on the rabbit reticulocyte lysate (RRL), in which HBc is expressed at physiological concentrations and assembles into capsids under near-physiological conditions. This system has already revealed HBc assembly requirements that are not anticipated based on previous assembly systems. Furthermore, capsid assembly in this system is regulated by endogenous host factors that can be readily manipulated. Here we present a detailed protocol for this cell-free capsid assembly system, including an illustration on how to manipulate host factors that regulate assembly.
Lessons from a Space Analog on Adaptation for Long-Duration Exploration Missions.
Anglin, Katlin M; Kring, Jason P
2016-04-01
Exploration missions to asteroids and Mars will bring new challenges associated with communication delays and more autonomy for crews. Mission safety and success will rely on how well the entire system, from technology to the human elements, is adaptable and resilient to disruptive, novel, or potentially catastrophic events. The recent NASA Extreme Environment Missions Operations (NEEMO) 20 mission highlighted this need and produced valuable "lessons learned" that will inform future research on team adaptation and resilience. A team of NASA, industry, and academic members used an iterative process to design a tripod shaped structure, called the CORAL Tower, for two astronauts to assemble underwater with minimal tools. The team also developed assembly procedures, administered training to the crew, and provided support during the mission. During the design, training, and assembly of the Tower, the team learned first-hand how adaptation in extreme environments depends on incremental testing, thorough procedures and contingency plans that predict possible failure scenarios, and effective team adaptation and resiliency for the crew and support personnel. Findings from NEEMO 20 provide direction on the design and testing process for future space systems and crews to maximize adaptation. This experience also underscored the need for more research on team adaptation, particularly how input and process factors affect adaption outcomes, the team adaptation iterative process, and new ways to measure the adaptation process.
Orbit Transfer Rocket Engine Technology Program: Advanced engine study, task D.1/D.3
NASA Technical Reports Server (NTRS)
Martinez, A.; Erickson, C.; Hines, B.
1986-01-01
Concepts for space maintainability of OTV engines were examined. An engine design was developed which was driven by space maintenance requirements and by a failure mode and effects (FME) analysis. Modularity within the engine was shown to offer cost benefits and improved space maintenance capabilities. Space operable disconnects were conceptualized for both engine change-out and for module replacement. Through FME mitigation the modules were conceptualized to contain the least reliable and most often replaced engine components. A preliminary space maintenance plan was developed around a controls and condition monitoring system using advanced sensors, controls, and condition monitoring concepts. A complete engine layout was prepared satisfying current vehicle requirements and utilizing projected component advanced technologies. A technology plan for developing the required technology was assembled.
Computer system evolution requirements for autonomous checkout of exploration vehicles
NASA Technical Reports Server (NTRS)
Davis, Tom; Sklar, Mike
1991-01-01
This study, now in its third year, has had the overall objective and challenge of determining the needed hooks and scars in the initial Space Station Freedom (SSF) system to assure that on-orbit assembly and refurbishment of lunar and Mars spacecraft can be accomplished with the maximum use of automation. In this study automation is all encompassing and includes physical tasks such as parts mating, tool operation, and human visual inspection, as well as non-physical tasks such as monitoring and diagnosis, planning and scheduling, and autonomous visual inspection. Potential tasks for automation include both extravehicular activity (EVA) and intravehicular activity (IVA) events. A number of specific techniques and tools have been developed to determine the ideal tasks to be automated, and the resulting timelines, changes in labor requirements and resources required. The Mars/Phobos exploratory mission developed in FY89, and the Lunar Assembly/Refurbishment mission developed in FY90 and depicted in the 90 Day Study as Option 5, have been analyzed in detailed in recent years. The complete methodology and results are presented in FY89 and FY90 final reports.
Quantitative computational models of molecular self-assembly in systems biology
Thomas, Marcus; Schwartz, Russell
2017-01-01
Molecular self-assembly is the dominant form of chemical reaction in living systems, yet efforts at systems biology modeling are only beginning to appreciate the need for and challenges to accurate quantitative modeling of self-assembly. Self-assembly reactions are essential to nearly every important process in cell and molecular biology and handling them is thus a necessary step in building comprehensive models of complex cellular systems. They present exceptional challenges, however, to standard methods for simulating complex systems. While the general systems biology world is just beginning to deal with these challenges, there is an extensive literature dealing with them for more specialized self-assembly modeling. This review will examine the challenges of self-assembly modeling, nascent efforts to deal with these challenges in the systems modeling community, and some of the solutions offered in prior work on self-assembly specifically. The review concludes with some consideration of the likely role of self-assembly in the future of complex biological system models more generally. PMID:28535149
Quantitative computational models of molecular self-assembly in systems biology.
Thomas, Marcus; Schwartz, Russell
2017-05-23
Molecular self-assembly is the dominant form of chemical reaction in living systems, yet efforts at systems biology modeling are only beginning to appreciate the need for and challenges to accurate quantitative modeling of self-assembly. Self-assembly reactions are essential to nearly every important process in cell and molecular biology and handling them is thus a necessary step in building comprehensive models of complex cellular systems. They present exceptional challenges, however, to standard methods for simulating complex systems. While the general systems biology world is just beginning to deal with these challenges, there is an extensive literature dealing with them for more specialized self-assembly modeling. This review will examine the challenges of self-assembly modeling, nascent efforts to deal with these challenges in the systems modeling community, and some of the solutions offered in prior work on self-assembly specifically. The review concludes with some consideration of the likely role of self-assembly in the future of complex biological system models more generally.
Technology Readiness of the NEXT Ion Propulsion System
NASA Technical Reports Server (NTRS)
Benson, Scott W.; Patterson, Michael J.
2008-01-01
The NASA's Evolutionary Xenon Thruster (NEXT) ion propulsion system has been in advanced technology development under the NASA In-Space Propulsion Technology project. The highest fidelity hardware planned has now been completed by the government/industry team, including: a flight prototype model (PM) thruster, an engineering model (EM) power processing unit, EM propellant management assemblies, a breadboard gimbal, and control unit simulators. Subsystem and system level technology validation testing is in progress. To achieve the objective Technology Readiness Level 6, environmental testing is being conducted to qualification levels in ground facilities simulating the space environment. Additional tests have been conducted to characterize the performance range and life capability of the NEXT thruster. This paper presents the status and results of technology validation testing accomplished to date, the validated subsystem and system capabilities, and the plans for completion of this phase of NEXT development. The next round of competed planetary science mission announcements of opportunity, and directed mission decisions, are anticipated to occur in 2008 and 2009. Progress to date, and the success of on-going technology validation, indicate that the NEXT ion propulsion system will be a primary candidate for mission consideration in these upcoming opportunities.
Changes in Quality of Health Care Delivery after Vertical Integration
Carlin, Caroline S; Dowd, Bryan; Feldman, Roger
2015-01-01
Objectives To fill an empirical gap in the literature by examining changes in quality of care measures occurring when multispecialty clinic systems were acquired by hospital-owned, vertically integrated health care delivery systems in the Twin Cities area. Data Sources/Study Setting Administrative data for health plan enrollees attributed to treatment and control clinic systems, merged with U.S. Census data. Study Design We compared changes in quality measures for health plan enrollees in the acquired clinics to enrollees in nine control groups using a differences-in-differences model. Our dataset spans 2 years prior to and 4 years after the acquisitions. We estimated probit models with errors clustered within enrollees. Data Collection/Extraction Methods Data were assembled by the health plan’s informatics team. Principal Findings Vertical integration is associated with increased rates of colorectal and cervical cancer screening and more appropriate emergency department use. The probability of ambulatory care–sensitive admissions increased when the acquisition caused disruption in admitting patterns. Conclusions Moving a clinic system into a vertically integrated delivery system resulted in limited increases in quality of care indicators. Caution is warranted when the acquisition causes disruption in referral patterns. PMID:25529312
ERIC Educational Resources Information Center
Mayer, Frederick W., Ed.; Schmult, Carl V. Jr., Ed.
The annual conference encouraged communication among individuals and disciplines relating to long-range development of institutions of higher education. Ideas, comments, and major speeches were assembled and published. Major areas of interest following the introduction are--(1) college and university planning in Canada, (2) the educational…
The Virginia Plan for Higher Education: Annual Report for 2016 to the General Assembly of Virginia
ERIC Educational Resources Information Center
State Council of Higher Education for Virginia, 2017
2017-01-01
The Virginia Plan for Higher Education is designed to identify trends that the Commonwealth must address if it is to prosper and succeed. Through input by higher education partners, The Virginia Plan is intended to help guide a vision for Virginia's future through a common framework. This framework is built on the premise that all partners in…
International Space Station Evolution Data Book. Volume 2; Evolution Concepts; Revised
NASA Technical Reports Server (NTRS)
Jorgensen, Catherine A. (Editor); Antol, Jeffrey (Technical Monitor)
2000-01-01
This report provides a focused and in-depth look at the opportunities and drivers for the enhancement and evolution of the International Space Station (ISS) during assembly and beyond the assembly complete stage. These enhancements would expand and improve the current baseline capabilities of the ISS and help to facilitate the commercialization of the ISS by the private sector. Volume 1 provides the consolidated overview of the ISS baseline systems; information on the current facilities available for pressurized and unpressurized payloads; and information on current plans for crew availability and utilization, resource timelines and margin summaries including power, thermal, and storage volumes; and an overview of the vehicle traffic model. Volume 2 includes discussions of advanced technologies being investigated for use on the ISS and potential commercial utilization activities being examined including proposed design reference missions (DRM's) and the technologies being assessed by the Pre-planned Program Improvement (P(sup 3) I) Working Group. This information is very high level and does not provide the relevant information necessary for detailed design efforts. This document is meant to educate readers on the ISS and to stimulate the generation of ideas for enhancement and utilization of the ISS, either by or for the government, academia, and commercial industry.
Online Aerial Terrain Mapping for Ground Robot Navigation
Peterson, John; Chaudhry, Haseeb; Abdelatty, Karim; Bird, John; Kochersberger, Kevin
2018-01-01
This work presents a collaborative unmanned aerial and ground vehicle system which utilizes the aerial vehicle’s overhead view to inform the ground vehicle’s path planning in real time. The aerial vehicle acquires imagery which is assembled into a orthomosaic and then classified. These terrain classes are used to estimate relative navigation costs for the ground vehicle so energy-efficient paths may be generated and then executed. The two vehicles are registered in a common coordinate frame using a real-time kinematic global positioning system (RTK GPS) and all image processing is performed onboard the unmanned aerial vehicle, which minimizes the data exchanged between the vehicles. This paper describes the architecture of the system and quantifies the registration errors between the vehicles. PMID:29461496
Computer aided fixture design - A case based approach
NASA Astrophysics Data System (ADS)
Tanji, Shekhar; Raiker, Saiesh; Mathew, Arun Tom
2017-11-01
Automated fixture design plays important role in process planning and integration of CAD and CAM. An automated fixture setup design system is developed where when fixturing surfaces and points are described allowing modular fixture components to get automatically select for generating fixture units and placed into position with satisfying assembled conditions. In past, various knowledge based system have been developed to implement CAFD in practice. In this paper, to obtain an acceptable automated machining fixture design, a case-based reasoning method with developed retrieval system is proposed. Visual Basic (VB) programming language is used in integrating with SolidWorks API (Application programming interface) module for better retrieval procedure reducing computational time. These properties are incorporated in numerical simulation to determine the best fit for practical use.
Extension of the IAU Metric to BE Considered for Inner Solar System Laser Experiments
NASA Astrophysics Data System (ADS)
Minazzoli, Olivier; Chauvineau, Bertrand
An increasing number of forthcoming spatial experiments will require a description of the solar system gravitational field including all the second order terms in the PN (Post-Newtonian) metric. This will be the case for missions planned or in project, like TIPO, ASTROD, LATOR. However, the solar system metric recommended by the IAU resolution B1.3, during its 24th general assembly in 2000, allows light propagation calculations until order 1.5 only. Hence, it is necessary to generalize this framework to include relevant contributing terms, which indeed are required for a great number of near-future interplanetary space missions. The present paper proposes such an extension for both General Relativity and Scalar-Tensor theories.
Online Aerial Terrain Mapping for Ground Robot Navigation.
Peterson, John; Chaudhry, Haseeb; Abdelatty, Karim; Bird, John; Kochersberger, Kevin
2018-02-20
This work presents a collaborative unmanned aerial and ground vehicle system which utilizes the aerial vehicle's overhead view to inform the ground vehicle's path planning in real time. The aerial vehicle acquires imagery which is assembled into a orthomosaic and then classified. These terrain classes are used to estimate relative navigation costs for the ground vehicle so energy-efficient paths may be generated and then executed. The two vehicles are registered in a common coordinate frame using a real-time kinematic global positioning system (RTK GPS) and all image processing is performed onboard the unmanned aerial vehicle, which minimizes the data exchanged between the vehicles. This paper describes the architecture of the system and quantifies the registration errors between the vehicles.
2006-01-09
Water vapor surges from the flame deflector of the A-2 Test Stand at NASA's Stennis Space Center on Jan. 9 during the first space shuttle main engine test of the year. The test was an engine acceptance test of flight engine 2058. It's the first space shuttle main engine to be completely assembled at Kennedy Space Center. Objectives also included first-time (green run) tests of a high-pressure oxidizer turbo pump and an Advanced Health System Monitor engine controller. The test ran for the planned duration of 520 seconds.
Cell module and fuel conditioner development
NASA Technical Reports Server (NTRS)
Hoover, D. Q., Jr.
1981-01-01
The results of pretesting and performance testing of Stack 564 are reported. The design features, progress in fabrication and plans for assembly of Stack 800 are given. The status of endurance testing of Stack 560 is reported. The design, fabrication, test procedures and preliminary tests of the 10 kW double counterflow reformer and the reformer test stand are described. Results of vendor contacts to define the performance and cost of fuel conditioning system components are reported. The results of burner tests and continuing development of the BOLTAR program are reported.
NASA Technical Reports Server (NTRS)
1985-01-01
A mock-up for the development of the Engineering Model (EM) and Flight Model (FM) is introduced which shortens the delay of 7 weeks regarding the previous planned launch date of September 30, to about 3 weeks maintaining the 4 weeks reserve is discussed. As compared with the new assembly integration test (EM-AIT) schedule of March 11, 1985, the EM data handling system is on the critical path. For the attitude measurement and control subsystem, sufficiently flexibility is achieved through combination of dummies and EM hardware to catch up with the existing delays.
2001-04-19
KENNEDY SPACE CENTER, FLA. -- Spring leaves frame the launch of Space Shuttle Endeavour on mission STS-100, the ninth flight to the International Space Station. Liftoff occurred at 2:40:42 p.m. EDT. The 11-day mission will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator System and the UHF Antenna. The mission includes two planned spacewalks for installation of the SSRMS on the Station. Also onboard is the Multi-Purpose Logistics Module Raffaello, carrying resupply stowage racks and resupply/return stowage platform
2001-04-19
KENNEDY SPACE CENTER, FLA. -- Spring leaves frame Space Shuttle Endeavour as the water captures the launch of mission STS-100. Liftoff of Endeavour on the ninth flight to the International Space Station occurred at 2:40:42 p.m. EDT. The 11-day mission will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator System and the UHF Antenna. The mission includes two planned spacewalks for installation of the SSRMS on the Station. Also onboard is the Multi-Purpose Logistics Module Raffaello, carrying resupply stowage racks and resupply/return stowage platforms
Primary care renewal: regional faculty development and organizational change.
Quirk, Mark E; Haley, Heather-Lyn; Hatem, David; Starr, Susan; Philbin, Mary
2005-03-01
Many reports, including the Future of Family Medicine, have called for change in primary care, but few have defined, implemented, and evaluated mechanisms to address such change. The regional, interdisciplinary Primary Care Renewal Project was designed to address problems in primary care practice and teaching related to practice management, compensation, increasing responsibility for teaching, and faculty development. Twelve northeastern US medical schools assembled a conference attended by teams of key stakeholders representing both clinical and educational missions. Teams developed and implemented an institutional plan to address identified needs. Outcome data was collected during, and for 1 year after, the conference. Findings demonstrate novel ways of improving learning experiences, coordinating and centralizing planning efforts, and addressing faculty needs. The magnitude of organizational change ranged from establishing new administrative units with significant institutional authority (eg, restructuring dean's office) to enhancing the strategic planning process and refining mission statements to reflect emphasis on primary care. A well-planned, regional interdisciplinary effort that fosters the development of concrete plans can be associated with significant change in medical education. A central theme emerged--that primary care medicine will survive only if institutions align their educational and clinical missions and foster system-wide change.
A development of logistics management models for the Space Transportation System
NASA Technical Reports Server (NTRS)
Carrillo, M. J.; Jacobsen, S. E.; Abell, J. B.; Lippiatt, T. F.
1983-01-01
A new analytic queueing approach was described which relates stockage levels, repair level decisions, and the project network schedule of prelaunch operations directly to the probability distribution of the space transportation system launch delay. Finite source population and limited repair capability were additional factors included in this logistics management model developed specifically for STS maintenance requirements. Data presently available to support logistics decisions were based on a comparability study of heavy aircraft components. A two-phase program is recommended by which NASA would implement an integrated data collection system, assemble logistics data from previous STS flights, revise extant logistics planning and resource requirement parameters using Bayes-Lin techniques, and adjust for uncertainty surrounding logistics systems performance parameters. The implementation of these recommendations can be expected to deliver more cost-effective logistics support.
ASSEMBLY TRANSFER SYSTEM DESCRIPTION DOCUMENT
DOE Office of Scientific and Technical Information (OSTI.GOV)
B. Gorpani
2000-06-26
The Assembly Transfer System (ATS) receives, cools, and opens rail and truck transportation casks from the Carrier/Cask Handling System (CCHS). The system unloads transportation casks consisting of bare Spent Nuclear Fuel (SNF) assemblies, single element canisters, and Dual Purpose Canisters (DPCs). For casks containing DPCs, the system opens the DPCs and unloads the SNF. The system stages the assemblies, transfer assemblies to and from fuel-blending inventory pools, loads them into Disposal Containers (DCs), temporarily seals and inerts the DC, decontaminates the DC and transfers it to the Disposal Container Handling System. The system also prepares empty casks and DPCs formore » off-site shipment. Two identical Assembly Transfer System lines are provided in the Waste Handling Building (WHB). Each line operates independently to handle the waste transfer throughput and to support maintenance operations. Each system line primarily consists of wet and dry handling areas. The wet handling area includes a cask transport system, cask and DPC preparation system, and a wet assembly handling system. The basket transport system forms the transition between the wet and dry handling areas. The dry handling area includes the dry assembly handling system, assembly drying system, DC preparation system, and DC transport system. Both the wet and dry handling areas are controlled by the control and tracking system. The system operating sequence begins with moving transportation casks to the cask preparation area. The cask preparation operations consist of cask cavity gas sampling, cask venting, cask cool-down, outer lid removal, and inner shield plug lifting fixture attachment. Casks containing bare SNF (no DPC) are filled with water and placed in the cask unloading pool. The inner shield plugs are removed underwater. For casks containing a DPC, the cask lid(s) is removed, and the DPC is penetrated, sampled, vented, and cooled. A DPC lifting fixture is attached and the cask is placed into the cask unloading pool. In the cask unloading pool the DPC is removed from the cask and placed in an overpack and the DPC lid is severed and removed. Assemblies are removed from either an open cask or DPC and loaded into assembly baskets positioned in the basket staging rack in the assembly unloading pool. A method called ''blending'' is utilized to load DCs with a heat output of less than 11.8 kW. This involves combining hotter and cooler assemblies from different baskets. Blending requires storing some of the hotter fuel assemblies in fuel-blending inventory pools until cooler assemblies are available. The assembly baskets are then transferred from the basket staging rack to the assembly handling cell and loaded into the assembly drying vessels. After drying, the assemblies are removed from the assembly drying vessels and loaded into a DC positioned below the DC load port. After installation of a DC inner lid and temporary sealing device, the DC is transferred to the DC decontamination cell where the top area of the DC, the DC lifting collar, and the DC inner lid and temporary sealing device are decontaminated, and the DC is evacuated and backfilled with inert gas to prevent prolonged clad exposure to air. The DC is then transferred to the Disposal Container Handling System for lid welding. In another cask preparation and decontamination area, lids are replaced on the empty transportation casks and DPC overpacks, the casks and DPC overpacks are decontaminated, inspected, and transferred to the Carrier/Cask Handling System for shipment off-site. All system equipment is designed to facilitate manual or remote operation, decontamination, and maintenance. The system interfaces with the Carrier/Cask Handling System for incoming and outgoing transportation casks and DPCs. The system also interfaces with the Disposal Container Handling System, which prepares the DC for loading and subsequently seals the loaded DC. The system support interfaces are the Waste Handling Building System and other internal WHB support systems.« less
ERIC Educational Resources Information Center
Basham, Matthew J.; Campbell, Dale F.; Mendoza, Pilar
2008-01-01
Three focus groups consisting of board of trustee members, community college presidents, senior administrators, administrators, and faculty members developed critical issues facing community colleges with respect to instructional planning and services; planning, governance, and finance; and workforce development. Thereafter, the delegation of more…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Knight, Thomas
2013-04-10
Today it is commonplace to design and construct single silicon chips with billions of transistors. These are complex systems, difficult (but possible) to design, test, and fabricate. Remarkably, simple living systems can be assembled from a similar number of atoms, most of them in water molecules. In this talk I will present the current status of our attempts at full understanding and complexity reduction of one of the simplest living systems, the free-living bacterial species Mesoplasma florum. This 400 nm diameter cell thrives and replicates every 40 minutes with a genome of only 800 kilobases. Our recent experiments using transposonmore » gene knockouts identified 354 of 683 annotated genes as inessential in laboratory culture when inactivated individually. While a functional redesigned genome will certainly not remove all of those genes, this suggests that roughly half the genome can be removed in an intentional redesign. I will discuss our recent knockout results and methodology, and our future plans for Genome re-engineering using targeted knock-in/knock-out double recombination; whole cell metabolic models; comprehensive whole cell metabolite measurement techniques; creation of plug-and-play metabolic modules for the simplified organism; inherent and engineered biosafety control mechanisms. This redesign is part of a comprehensive plan to lay the foundations for a new discipline of engineering biology. Engineering biological systems requires a fundamentally different viewpoint from that taken by the science of biology. Key engineering principles of modularity, simplicity, separation of concerns, abstraction, flexibility, hierarchical design, isolation, and standardization are of critical importance. The essence of engineering is the ability to imagine, design, model, build, and characterize novel systems to achieve specific goals. Current tools and components for these tasks are primitive. Our approach is to create and distribute standard biological parts, organisms, assembly techniques, and measurement techniques as a way of enabling this new field.« less
Task allocation among multiple intelligent robots
NASA Technical Reports Server (NTRS)
Gasser, L.; Bekey, G.
1987-01-01
Researchers describe the design of a decentralized mechanism for allocating assembly tasks in a multiple robot assembly workstation. Currently, the approach focuses on distributed allocation to explore its feasibility and its potential for adaptability to changing circumstances, rather than for optimizing throughput. Individual greedy robots make their own local allocation decisions using both dynamic allocation policies which propagate through a network of allocation goals, and local static and dynamic constraints describing which robots are elibible for which assembly tasks. Global coherence is achieved by proper weighting of allocation pressures propagating through the assembly plan. Deadlock avoidance and synchronization is achieved using periodic reassessments of local allocation decisions, ageing of allocation goals, and short-term allocation locks on goals.
System and method for controlling a combustor assembly
York, William David; Ziminsky, Willy Steve; Johnson, Thomas Edward; Stevenson, Christian Xavier
2013-03-05
A system and method for controlling a combustor assembly are disclosed. The system includes a combustor assembly. The combustor assembly includes a combustor and a fuel nozzle assembly. The combustor includes a casing. The fuel nozzle assembly is positioned at least partially within the casing and includes a fuel nozzle. The fuel nozzle assembly further defines a head end. The system further includes a viewing device configured for capturing an image of at least a portion of the head end, and a processor communicatively coupled to the viewing device, the processor configured to compare the image to a standard image for the head end.
International Space Station USOS Waste and Hygiene Compartment Development
NASA Technical Reports Server (NTRS)
Link, Dwight E., Jr.; Broyan, James Lee, Jr.; Gelmis, Karen; Philistine, Cynthia; Balistreri, Steven
2007-01-01
The International Space Station (ISS) currently provides human waste collection and hygiene facilities in the Russian Segment Service Module (SM) which supports a three person crew. Additional hardware is planned for the United States Operational Segment (USOS) to support expansion of the crew to six person capability. The additional hardware will be integrated in an ISS standard equipment rack structure that was planned to be installed in the Node 3 element; however, the ISS Program Office recently directed implementation of the rack, or Waste and Hygiene Compartment (WHC), into the U.S. Laboratory element to provide early operational capability. In this configuration, preserved urine from the WHC waste collection system can be processed by the Urine Processor Assembly (UPA) in either the U.S. Lab or Node 3 to recover water for crew consumption or oxygen production. The human waste collection hardware is derived from the Service Module system and is provided by RSC-Energia. This paper describes the concepts, design, and integration of the WHC waste collection hardware into the USOS including integration with U.S. Lab and Node 3 systems.
Internship - practical education
DOE Office of Scientific and Technical Information (OSTI.GOV)
Porell, A.L.; Bauman, H.F.
1989-01-01
The current emphasis on regulatory compliance with environmental laws has depleted the availability of experienced environmental scientists and engineers needed to initiate critical environmental projects. Further, projects of short duration and long-term commitments to employment situations are considered a high risk for both the employer and the employee. Martin Marietta Energy Systems, Inc., has met this challenge for federal agencies through the US Department of Energy's (DOE's) Hazardous Waste Remedial Actions Program (HAZWRAP). Through unique interdepartmental agency agreements between the DOE and the Department of Defense (DOD) and contractual arrangements between Energy Systems, DOE, and the University of Tennessee's (UT's)more » Waste Management Institute (WMI), an intern program was formulated. HAZWRAP is a DOE headquarters' program for addressing hazardous-waste issues at all DOE facilities. Energy Systems is the support contractor office responsible for developing policies and implementing plans for this program. Under this charter, HAZWRAP assembled a large staff of experienced project managers for developing remedial actions plans, while providing other federal agencies assistance in implementing their remedial actions programs. HAZWRAP project managers are currently managing remedial investigations and feasibility studies at 130 federal facilities located throughout the DOD.« less
ATLAS LTCS Vertically Challenged System Lessons Learned
NASA Technical Reports Server (NTRS)
Patel, Deepak; Garrison, Matt; Ku, Jentung
2014-01-01
Re-planning of LTCS TVAC testing and supporting RTA (Receiver Telescope Assembly) Test Plan and Procedure document preparation. The Laser Thermal Control System (LTCS) is designed to maintain the lasers onboard Advanced Topographic Laser Altimeter System (ATLAS) at their operational temperatures. In order to verify the functionality of the LTCS, a thermal balance test of the thermal hardware was performed. During the first cold start of the LTCS, the Loop Heat Pipe (LHP) was unable to control the laser mass simulators temperature. The control heaters were fully on and the loop temperature remained well below the desired setpoint. Thermal analysis of the loop did not show these results. This unpredicted behavior of the LTCS was brought up to a panel of LHP experts. Based on the testing and a review of all the data, there were multiple diagnostic performed in order to narrow down the cause. The prevailing theory is that gravity is causing oscillating flow within the loop, which artificially increased the control power needs. This resulted in a replan of the LTCS test flow and the addition of a GSE heater to allow vertical operation.
NASA Technical Reports Server (NTRS)
Bekey, I.; Mayer, H. L.; Wolfe, M. G.
1976-01-01
The likely system concepts which might be representative of NASA and DoD space programs in the 1980-2000 time period were studied along with the programs' likely needs for major space transportation vehicles, orbital support vehicles, and technology developments which could be shared by the military and civilian space establishments in that time period. Such needs could then be used by NASA as an input in determining the nature of its long-range development plan. The approach used was to develop a list of possible space system concepts (initiatives) in parallel with a list of needs based on consideration of the likely environments and goals of the future. The two lists thus obtained represented what could be done, regardless of need; and what should be done, regardless of capability, respectively. A set of development program plans for space application concepts was then assembled, matching needs against capabilities, and the requirements of the space concepts for support vehicles, transportation, and technology were extracted. The process was pursued in parallel for likely military and civilian programs, and the common support needs thus identified.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Celotta, Robert J., E-mail: robert.celotta@nist.gov, E-mail: joseph.stroscio@nist.gov; Hess, Frank M.; Rutter, Gregory M.
2014-12-15
A major goal of nanotechnology is to develop the capability to arrange matter at will by placing individual atoms at desired locations in a predetermined configuration to build a nanostructure with specific properties or function. The scanning tunneling microscope has demonstrated the ability to arrange the basic building blocks of matter, single atoms, in two-dimensional configurations. An array of various nanostructures has been assembled, which display the quantum mechanics of quantum confined geometries. The level of human interaction needed to physically locate the atom and bring it to the desired location limits this atom assembly technology. Here we report themore » use of autonomous atom assembly via path planning technology; this allows atomically perfect nanostructures to be assembled without the need for human intervention, resulting in precise constructions in shorter times. We demonstrate autonomous assembly by assembling various quantum confinement geometries using atoms and molecules and describe the benefits of this approach.« less
Shuttle payload vibroacoustic test plan evaluation
NASA Technical Reports Server (NTRS)
Stahle, C. V.; Gongloff, H. R.; Young, J. P.; Keegan, W. B.
1977-01-01
Statistical decision theory is used to evaluate seven alternate vibro-acoustic test plans for Space Shuttle payloads; test plans include component, subassembly and payload testing and combinations of component and assembly testing. The optimum test levels and the expected cost are determined for each test plan. By including all of the direct cost associated with each test plan and the probabilistic costs due to ground test and flight failures, the test plans which minimize project cost are determined. The lowest cost approach eliminates component testing and maintains flight vibration reliability by performing subassembly tests at a relatively high acoustic level.
RoBlock: a prototype autonomous manufacturing cell
NASA Astrophysics Data System (ADS)
Baekdal, Lars K.; Balslev, Ivar; Eriksen, Rene D.; Jensen, Soren P.; Jorgensen, Bo N.; Kirstein, Brian; Kristensen, Bent B.; Olsen, Martin M.; Perram, John W.; Petersen, Henrik G.; Petersen, Morten L.; Ruhoff, Peter T.; Skjolstrup, Carl E.; Sorensen, Anders S.; Wagenaar, Jeroen M.
2000-10-01
RoBlock is the first phase of an internally financed project at the Institute aimed at building a system in which two industrial robots suspended from a gantry, as shown below, cooperate to perform a task specified by an external user, in this case, assembling an unstructured collection of colored wooden blocks into a specified 3D pattern. The blocks are identified and localized using computer vision and grasped with a suction cup mechanism. Future phases of the project will involve other processes such as grasping and lifting, as well as other types of robot such as autonomous vehicles or variable geometry trusses. Innovative features of the control software system include: The use of an advanced trajectory planning system which ensures collision avoidance based on a generalization of the method of artificial potential fields, the use of a generic model-based controller which learns the values of parameters, including static and kinetic friction, of a detailed mechanical model of itself by comparing actual with planned movements, the use of fast, flexible, and robust pattern recognition and 3D-interpretation strategies, integration of trajectory planning and control with the sensor systems in a distributed Java application running on a network of PC's attached to the individual physical components. In designing this first stage, the aim was to build in the minimum complexity necessary to make the system non-trivially autonomous and to minimize the technological risks. The aims of this project, which is planned to be operational during 2000, are as follows: To provide a platform for carrying out experimental research in multi-agent systems and autonomous manufacturing systems, to test the interdisciplinary cooperation architecture of the Maersk Institute, in which researchers in the fields of applied mathematics (modeling the physical world), software engineering (modeling the system) and sensor/actuator technology (relating the virtual and real worlds) could collaborate with systems integrators to construct intelligent, autonomous systems, and to provide a showpiece demonstrator in the entrance hall of the Institute's new building.
A Modular Approach To Developing A Large Deployable Reflector
NASA Astrophysics Data System (ADS)
Pittman, R.; Leidich, C.; Mascy, F.; Swenson, B.
1984-01-01
NASA is currently studying the feasibility of developing a Large Deployable Reflector (LDR) astronomical facility to perform astrophysical studies of the infrared and submillimeter portion of the spectrum in the mid 1990's. The LDR concept was recommended by the Astronomy Survey Committee of the National Academy of Sciences as one of two space based projects to be started this decade. The current baseline calls for a 20 m (65.6 ft) aperture telescope diffraction limited at 30 μm and automatically deployed from a single Shuttle launch. The volume, performance, and single launch constraints place great demands on the technology and place LDR beyond the state-of-the-art in certain areas such as lightweight reflector segments. The advent of the Shuttle is opening up many new options and capabilities for producing large space systems. Until now, LDR has always been conceived as an integrated system, deployed autonomously in a single launch. This paper will look at a combination of automatic deployment and on-orbit assembly that may reduce the technological complexity and cost of the LDR system. Many technological tools are now in use or under study that will greatly enhance our capabilities to do assembly in space. Two Shuttle volume budget scenarios will be examined to assess the potential of these tools to reduce the LDR system complexity. Further study will be required to reach the full optimal combination of deployment and assembly, since in most cases the capabilities of these new tools have not been demonstrated. In order to take maximum advantage of these concepts, the design of LDR must be flexible and allow one subsystem to be modified without adversely affecting the entire system. One method of achieving this flexibility is to use a modular design approach in which the major subsystems are physically separated during launch and assembled on orbit. A modular design approach facilitates this flexibility but requires that the subsystems be interfaced in a simple, straightforward, and controlled manner. NASA is currently defining a technology development plan for LDR which will identify the technology advances that are required. The modular approach offers the flexibility to easily incorporate these new advances into the design.
Test development for the thermionic system evaluation test (TSET) project
NASA Astrophysics Data System (ADS)
Morris, D. Brent; Standley, Vaughn H.; Schuller, Michael J.
1992-01-01
The arrival of a Soviet TOPAZ-II space nuclear reactor affords the US space nuclear power (SNP) community the opportunity to study an assembled thermionic conversion power system. The TOPAZ-II will be studied via the Thermionic System Evaluation Test (TSET) Project. This paper is devoted to the discussion of TSET test development as related to the objectives contained in the TSET Project Plan (Standley et al. 1991). The objectives contained in the Project Plan are the foundation for scheduled TSET tests on TOPAZ-II and are derived from the needs of the Air Force Thermionic SNP program. Our ability to meet the objectives is bounded by unique constraints, such as procurement requirements, operational limitations, and necessary interaction between US and Soviet Scientists and engineers. The fulfillment of the test objectives involves a thorough methodology of test scheduling and data managment. The overall goals for the TSET program are gaining technical understanding of a thermionic SNP system and demonstrating the capabilities and limitations of such a system while assisting in the training of US scientist and engineers in preparation for US SNP system testing. Tests presently scheduled as part of TSET include setup, demonstration, and verification tests; normal and off-normal operating test, and system and component performance tests.
The WEAVE focus translation system: from design to construction
NASA Astrophysics Data System (ADS)
Canchado, Manuel; Romero, Antonio; Maroto, Óscar; Tomas, Albert; Martín-Nuño, Carlos; Casalta, Joan Manel; Prida, Joaquín.; L. Aguerri, J. Alfonso; Herreros, José Miguel; Delgado, José Miguel; Burgal, José Alonso; Abrams, Don Carlos; Dee, Kevin; Dalton, Gavin; Bonifacio, Piercarlo; Trager, Scott C.; Vallenari, Antonella
2016-07-01
WEAVE is a new wide-field spectroscopy facility proposed for the prime focus of the 4.2m William Herschel Telescope (WHT), placed in La Palma, Canary Islands, Spain. To allow for the compensation of the effects of temperature-induced and gravity-induced image degradation, the WEAVE prime focus assembly will be translated along the telescope optical axis. The assembly comprises the prime focus corrector with integrated ADC, a central mount for the corrector, an instrument rotator and a twin-focal-plane fibre positioner. Translation is accomplished through the use of a set of purpose-built actuators; collectively referred to as the Focus Translation System (FTS), formed by four independently-controlled Focus Translation Units (FTUs), eight vanes connecting the FTUs to a central can, and a central can hosting WEAVE Instrument. Each FTU is capable of providing a maximum stroke of +/-4mm with sufficient, combined force to move the five-tonne assembly with a positional accuracy of +/-20μm at a resolution of 5μm. The coordinated movement of the four FTUs allows +/-3mm WEAVE focus adjustment in the optical axis and +/-0.015° tilt correction in one axis. The control of the FTS is accomplished through a PLC-based subsystem that receives positional demands from the higher-level Instrument Control System. SENER has been responsible for designing, manufacturing and testing the FTS and the equipment required to manipulate and store the FTS together with the instrument. This manuscript describes the final design of the FTS along with the analyses and simulations that were performed, discusses the manufacturing procedures and the results of early verification prior to integration with the telescope. The plans for mounting the whole system on the telescope are also discussed.
NASA Technical Reports Server (NTRS)
Knox, James C.; Campbell, Melissa; Murdoch, Karen; Miller, Lee A.; Jeng, Frank
2005-01-01
Currently on the International Space Station s (ISS) U.S. Segment, carbon dioxide (CO2) scrubbed from the cabin by a 4-Bed Molecular Sieve (4BMS) Carbon Dioxide Removal Assembly (CDRA) is vented overboard as a waste product. Likewise, the product hydrogen (H2) that will be generated by the Oxygen Generation Assembly (OGA) planned for installation will also be vented. A flight experiment has been proposed that will take the waste CO2 removed from the cabin, and via the catalytic Sabatier process, reduce it with waste H2 to generate water and methane. The water produced may provide cost and logistics savings for ISS by reducing the amount of water periodically re-supplied to orbit. To make this concept viable, a mechanical piston compressor and accumulator were developed for collecting and storing the CO2 from the CDRA. The compressor, accumulator and Sabatier system would be packaged together as one unit and referred to as the Carbon Dioxide Reduction Assembly (CRA). Testing was required to evaluate the performance of a 4BMS CDRA, compressor, accumulator, and Sabatier performance along with their operating rules when integrated together. This had been numerically modeled and simulated; however, testing was necessary to verify the results from the engineering analyses. Testing also allowed a better understanding of the practical inefficiencies and control issues involved in a fully integrated system versus the theoretical ideals in the model. This paper presents and discusses the results of an integrated engineering development unit test.
Advanced energy system program
NASA Astrophysics Data System (ADS)
Trester, K.
1987-06-01
The ogjectives are to design, develop, and demonstrate a natural-gas-fueled, highly recuperated, 50 kw Brayton-cycle cogeneration system for commercial, institutional, and multifamily residential applications. Recent marketing studies have shown that the Advanced Energy System (AES), with its many cost-effective features, has the potential to offer significant reductions in annual electrical and thermal energy costs to the consumer. Specific advantates of the system that result in low cost ownership are high electrical efficiency (34 percent, LHV), low maintenance, high reliability and long life (20 years). Significant technical features include: an integral turbogenerator with shaft-speed permanent magnet generator; a rotating assembly supported by compliant foil air bearings; a formed-tubesheet plate/fin recuperator with 91 percent effectiveness; and a bi-directional power conditioner to ultilize the generator for system startup. The planned introduction of catalytic combustion will further enhance the economic and ecological attractiveness.
Human Factors and Their Effects on Human-Centred Assembly Systems - A Literature Review-Based Study
NASA Astrophysics Data System (ADS)
Wang, Q.; Abubakar, M. I.
2017-09-01
If a product has more than one component, then it must be assembled. Assembly of products relies on assembly systems or lines in which assembly of each product is often carried out manually by human workers following assembly sequences in various forms. It is widely understood that efficiency of assembling a product by reducing assembly times (therefore costs) is vital particularly for small and medium-sized manufacturing companies to survive in an increasingly competitive market. Ideally, it is helpful for pre-determining efficiency or productivity of a human-centred assembly system at the early design stage. To date, most research on performance of an assembly system using modelling simulation methods is focused on its “operational functions”. The term used in a narrow sense always indicates the performance of the “operational system”, which does not incorporate the effect of human factors that may also affect the system performance. This paper presents a research outcome of findings through a literature review-based study by identifying possible human factors that mostly affect the performance on human-centred manufacturing systems as part of the research project incorporating parameters of human factors into a DES (discrete event simulation) tool.
Women's Participation in Physics Internationally: the IUPAP Working Group on Women
NASA Astrophysics Data System (ADS)
Franz, Judy
2001-04-01
In 1999 the General Assembly of the International Union of Pure and Applied Physics (IUPAP) voted to establish a Working Group on Women in Physics with the following charge: to survey the situation for women in physics in IUPAP member countries; to analyze and report the data collected along with suggestions on how to improve the situation; to suggest ways that women can become more involved in IUPAP, including the Liaison Committees, the Commissions, the Council, and the General Assemblies; and to report all findings at the next General Assembly in 2002. The Working Group was established in 2000 with 11 members representing North and South America, Europe, Asia and the Middle East/Africa. The Group has been gathering data on women in physics and is planning to hold an International Conference on Women in Physics at UNESCO Headquarters in Paris in March, 2002. I will discuss some of the findings and the plans for the future.
SU-F-T-08: Brachytherapy Film Dosimetry in a Water Phantom for a Ring and Tandem HDR Applicator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, B; Grelewicz, Z; Kang, Z
2016-06-15
Purpose: The feasibility of dose measurement using new generation EBT3 film was explored in a water phantom for a ring and tandem HDR applicator for measurements tracking mucosal dose during cervical brachytherapy. Methods: An experimental fixture was assembled to position the applicator in a water phantom. Prior to measurement, calibration curves for EBT3 film in water and in solidwater were verified. EBT3 film was placed at different known locations around the applicator in the water tank. A CT scan of the phantom with applicator was performed using clinical protocol. A typical cervical cancer treatment plan was then generated by Oncentramore » brachytherapy planning system. A dose of 500 cGy was prescribed to point A (2 cm, 2 cm). Locations measured by film included the outer surface of the ring, measurement point A-m (2.2 cm, 2.2 cm), and profiles extending from point A-m parallel to the tandem. Three independent measurements were conducted. The doses recorded by film were carefully analyzed and compared with values calculated by the treatment planning system. Results: Assessment of the EBT3 films indicate that the dose at point A matches the values predicted by the planning system. Dose to the point A-m was 411.5 cGy, and the outer circumferential surface dose of the ring was between 500 and 1150 cGy. It was found that from the point A-m, the dose drops 60% within 4.5 cm on the line parallel to the tandem. The measurement doses agree with the treatment planning system. Conclusion: Use of EBT3 film is feasible for in-water measurements for brachytherapy. A carefully machined apparatus will likely improve measurement accuracy. In a typical plan, our study found that the ring surface dose can be 2.5 times larger than the point A prescription dose. EBT3 film can be used to monitor mucosal dose in brachytherapy treatments.« less
Automatic arc welding of propulsion system tubing in close proximity to sensitive electronic devices
NASA Technical Reports Server (NTRS)
Lumsden, J. M.; Whittlesey, A. C.
1981-01-01
The planned final assembly of the Galileo spacecraft propulsion system tubing, which involves welding in close proximity to sensitive electronics, raised significant concerns about the effects of electromagnetic coupling of weld energy on CMOS and other sensitive integrated circuits. A test program was established to assess the potential of an orbital arc welder and an RF-induction brazing machine to damage sensitive electronic equipment. Test parameters were varied to assess the effectiveness of typical transient suppression practices such as grounding, bonding, and shielding. A technique was developed to calibrate the hazard levels at the victim-circuit location; this technique is described along with the results and conclusions of the test program.
Readiness for First Crewed Flight
NASA Technical Reports Server (NTRS)
Schaible, Dawn M.
2011-01-01
The NASA Engineering and Safety Center (NESC) was requested to develop a generic framework for evaluating whether any given program has sufficiently complete and balanced plans in place to allow crewmembers to fly safely on a human spaceflight system for the first time (i.e., first crewed flight). The NESC assembled a small team which included experts with experience developing robotic and human spaceflight and aviation systems through first crewed test flight and into operational capability. The NESC team conducted a historical review of the steps leading up to the first crewed flights of Mercury through the Space Shuttle. Benchmarking was also conducted with the United States (U.S.) Air Force and U.S. Navy. This report contains documentation of that review.
Development of Geospatial Map Based Election Portal
NASA Astrophysics Data System (ADS)
Gupta, A. Kumar Chandra; Kumar, P.; Vasanth Kumar, N.
2014-11-01
The Geospatial Delhi Limited (GSDL), a Govt. of NCT of Delhi Company formed in order to provide the geospatial information of National Capital Territory of Delhi (NCTD) to the Government of National Capital Territory of Delhi (GNCTD) and its organs such as DDA, MCD, DJB, State Election Department, DMRC etc., for the benefit of all citizens of Government of National Capital Territory of Delhi (GNCTD). This paper describes the development of Geospatial Map based Election portal (GMEP) of NCT of Delhi. The portal has been developed as a map based spatial decision support system (SDSS) for pertain to planning and management of Department of Chief Electoral Officer, and as an election related information searching tools (Polling Station, Assembly and parliamentary constituency etc.,) for the citizens of NCTD. The GMEP is based on Client-Server architecture model. It has been developed using ArcGIS Server 10.0 with J2EE front-end on Microsoft Windows environment. The GMEP is scalable to enterprise SDSS with enterprise Geo Database & Virtual Private Network (VPN) connectivity. Spatial data to GMEP includes delimited precinct area boundaries of Voters Area of Polling stations, Assembly Constituency, Parliamentary Constituency, Election District, Landmark locations of Polling Stations & basic amenities (Police Stations, Hospitals, Schools and Fire Stations etc.). GMEP could help achieve not only the desired transparency and easiness in planning process but also facilitates through efficient & effective tools for management of elections. It enables a faster response to the changing ground realities in the development planning, owing to its in-built scientific approach and open-ended design.
The precision measurement and assembly for miniature parts based on double machine vision systems
NASA Astrophysics Data System (ADS)
Wang, X. D.; Zhang, L. F.; Xin, M. Z.; Qu, Y. Q.; Luo, Y.; Ma, T. M.; Chen, L.
2015-02-01
In the process of miniature parts' assembly, the structural features on the bottom or side of the parts often need to be aligned and positioned. The general assembly equipment integrated with one vertical downward machine vision system cannot satisfy the requirement. A precision automatic assembly equipment was developed with double machine vision systems integrated. In the system, a horizontal vision system is employed to measure the position of the feature structure at the parts' side view, which cannot be seen with the vertical one. The position measured by horizontal camera is converted to the vertical vision system with the calibration information. By careful calibration, the parts' alignment and positioning in the assembly process can be guaranteed. The developed assembly equipment has the characteristics of easy implementation, modularization and high cost performance. The handling of the miniature parts and assembly procedure were briefly introduced. The calibration procedure was given and the assembly error was analyzed for compensation.
NASA Technical Reports Server (NTRS)
1976-01-01
The quality assurance program demonstrates recognition of the quality aspects and an organized approach to achieve them. It ensures that quality requirements are determined and satisfied throughout all phases of contract performance, including preliminary and engineering design, development, fabrication, processing, assembly, inspection, test, checkout, packaging, shipping, storage, maintenance field use, flight preparations, flight operations and post-flight analysis, as applicable.
The NIRspec assembly integration and test status
NASA Astrophysics Data System (ADS)
Wettemann, Thomas; Ehrenwinkler, Ralf; Johnson, Thomas E.; Maschmann, Marc; Mosner, Peter; te Plate, Maurice; Rödel, Andreas
2017-11-01
The Near-Infrared Spectrograph (NIRSpec) is one of the four instruments on the James Webb Space Telescope (JWST) scheduled for launch in 2018. NIRSpec has been manufactured and tested by an European industrial consortium led by Airbus Defence and Space and delivered to the European Space Agency (ESA) and NASA in September 2013. Since then it has successfully been integrated into the JWST Integrated Science Instrument Module (ISIM) and is currently in ISIM Cryo-Vacuum Test#2. Since however two of its most important assemblies, the Focal Plane Assembly (FPA) and the Micro-Shutter Assembly (MSA) need to be replaced by new units we will present the status of the instrument, the status of its new flight assemblies in manufacturing and testing and give an outlook on the planned exchange activities and the following instrument re-verification.
NASA Technical Reports Server (NTRS)
Khan, Ahmed
2010-01-01
The International Space Station (ISS) Operations Planning Team, Mission Control Centre and Mission Automation Support Network (MAS) have all evolved over the years to use commercial web-based technologies to create a configurable electronic infrastructure to manage the complex network of real-time planning, crew scheduling, resource and activity management as well as onboard document and procedure management required to co-ordinate ISS assembly, daily operations and mission support. While these Web technologies are classified as non-critical in nature, their use is part of an essential backbone of daily operations on the ISS and allows the crew to operate the ISS as a functioning science laboratory. The rapid evolution of the internet from 1998 (when ISS assembly began) to today, along with the nature of continuous manned operations in space, have presented a unique challenge in terms of software engineering and system development. In addition, the use of a wide array of competing internet technologies (including commercial technologies such as .NET and JAVA ) and the special requirements of having to support this network, both nationally among various control centres for International Partners (IPs), as well as onboard the station itself, have created special challenges for the MCC Web Tools Development Team, software engineers and flight controllers, who implement and maintain this system. This paper presents an overview of some of these operational challenges, and the evolving nature of the solutions and the future use of COTS based rich internet technologies in manned space flight operations. In particular this paper will focus on the use of Microsoft.s .NET API to develop Web-Based Operational tools, the use of XML based service oriented architectures (SOA) that needed to be customized to support Mission operations, the maintenance of a Microsoft IIS web server onboard the ISS, The OpsLan, functional-oriented Web Design with AJAX
Robotic technologies of the Flight Telerobotic Servicer (FTS) including fault tolerance
NASA Technical Reports Server (NTRS)
Chladek, John T.; Craver, William M.
1994-01-01
The original FTS concept for Space Station Freedom (SSF) was to provide telerobotic assistance to enhance crew activity and safety and to reduce crew EVA (Extra Vehicular Activity) activity. The first flight of the FTS manipulator systems would demonstrate several candidate tasks and would verify manipulator performance parameters. These first flight tasks included unlocking a SSF Truss Joint, mating/demating a fluid coupling, contact following of a contour board, demonstrating peg-in-hole assembly, and grasping and moving a mass. Future tasks foreseen for the FTS system included ORU (Orbit Replaceable Unit) change-out, Hubble Space Telescope Servicing, Gamma Ray Observatory refueling, and several in-situ SSF servicing and maintenance tasks. Operation of the FTS was planned to evolve from teleoperation to fully autonomous execution of many tasks. This wide range of mission tasks combined with the desire to evolve toward fully autonomy forced several requirements which may seen extremely demanding to the telerobotics community. The FTS requirements appear to have been created to accommodate the open-ended evolution plan such that operational evolution would not be impeded by function limitations. A recommendation arising from the FTS program to remedy the possible impacts from such ambitious requirements is to analyze candidate robotic tasks. Based on these task analyses, operational impacts against development impacts were weighed prior to requirements definition. Many of the FTS requirements discussed in the following sections greatly influenced the development cost and schedule of the FTS manipulator. The FTS manipulator has been assembled at Martin Marietta and is currently in testing. Successful component tests indicate a manipulator which achieves unprecedented performance specifications.
DOE Office of Scientific and Technical Information (OSTI.GOV)
WYRWAS RB; PAGE JS; COOKE GS
This test plan describes the methods to be used in the forensic examination of the Multi-probe Corrosion Monitoring System (MPCMS) installed in the double-shell tank 241-AY-101 (AY-101). The probe was designed by Applied Research and Engineering Sciences (ARES) Corporation. The probe contains four sections, each of which can be removed from the tank independently (H-14-107634, AY-101 MPCMS Removable Probe Assembly) and one fixed center assembly. Each removable section contains three types of passive corrosion coupons: bar coupons, round coupons, and stressed C-rings (H-14-l07635, AY-101 MPCMS Details). Photographs and weights of each coupon were recorded and reported on drawing H-14-107634 andmore » in RPP-RPT-40629, 241-AY-101 MPCMS C-Ring Coupon Photographs. The coupons will be the subject of the forensic analyses. The purpose of this examination will be to document the nature and extent of corrosion of the 29 coupons. This documentation will consist of photographs and photomicrographs of the C-rings and round coupons, as well as the weights of the bar and round coupons during corrosion removal. The total weight loss of the cleaned coupons will be used in conjunction with the surface area of each to calculate corrosion rates in mils per year. The bar coupons were presumably placed to investigate the liquid-air-interface. An analysis of the waste level heights in the waste tank will be investigated as part of this examination.« less
NASA's Space Launch System: Enabling Exploration and Discovery
NASA Technical Reports Server (NTRS)
Schorr, Andrew; Robinson, Kimberly F.; Hitt, David
2017-01-01
As NASA's new Space Launch System (SLS) launch vehicle continues to mature toward its first flight and beyond, so too do the agency's plans for utilization of the rocket. Substantial progress has been made toward the production of the vehicle for the first flight of SLS - an initial "Block 1" configuration capable of delivering more than 70 metric tons (t) to Low Earth Orbit (LEO). That vehicle will be used for an uncrewed integrated test flight, propelling NASA's Orion spacecraft into lunar orbit before it returns safely to Earth. Flight hardware for that launch is being manufactured at facilities around the United States, and, in the case of Orion's service module, beyond. At the same time, production has already begun on the vehicle for the second SLS flight, a more powerful Block 1B configuration capable of delivering more than 105 t to LEO. This configuration will be used for crewed launches of Orion, sending astronauts farther into space than anyone has previously ventured. The 1B configuration will introduce an Exploration Upper Stage, capable of both ascent and in-space propulsion, as well as a Universal Stage Adapter - a payload bay allowing the flight of exploration hardware with Orion - and unprecedentedly large payload fairings that will enable currently impossible spacecraft and mission profiles on uncrewed launches. The Block 1B vehicle will also expand on the initial configuration's ability to deploy CubeSat secondary payloads, creating new opportunities for low-cost access to deep space. Development work is also underway on future upgrades to SLS, which will culminate in about a decade in the Block 2 configuration, capable of delivering 130 t to LEO via the addition of advanced boosters. As the first SLS draws closer to launch, NASA continues to refine plans for the human deep-space exploration it will enable. Planning currently focuses on use of the vehicle to assemble a Deep Space Gateway, which would comprise a habitat in the lunar vicinity allowing astronauts to gain experience living and working in deep space, a testbed for new systems and capabilities needed for exploration beyond, and a departure point for NASA and partners to send missions to other destinations. Assembly of the Gateway would be followed by a Deep Space Transport, which would be a vehicle capable of carrying astronauts farther into our solar system and eventually to Mars. This paper will give an overview of SLS' current status and its capabilities, and discuss current utilization planning.
NASA's Space Launch System: Enabling Exploration and Discovery
NASA Technical Reports Server (NTRS)
Robinson, Kimberly F.; Schorr, Andrew
2017-01-01
As NASA's new Space Launch System (SLS) launch vehicle continues to mature toward its first flight and beyond, so too do the agency's plans for utilization of the rocket. Substantial progress has been made toward the production of the vehicle for the first flight of SLS - an initial "Block 1" configuration capable of delivering more than 70 metric tons (t) to Low Earth Orbit (LEO). That vehicle will be used for an uncrewed integrated test flight, propelling NASA's Orion spacecraft into lunar orbit before it returns safely to Earth. Flight hardware for that launch is being manufactured at facilities around the United States, and, in the case of Orion's service module, beyond. At the same time, production has already begun on the vehicle for the second SLS flight, a more powerful Block 1B configuration capable of delivering more than 105 metric tons to LEO. This configuration will be used for crewed launches of Orion, sending astronauts farther into space than anyone has previously ventured. The 1B configuration will introduce an Exploration Upper Stage, capable of both ascent and in-space propulsion, as well as a Universal Stage Adapter - a payload bay allowing the flight of exploration hardware with Orion - and unprecedentedly large payload fairings that will enable currently impossible spacecraft and mission profiles on uncrewed launches. The Block 1B vehicle will also expand on the initial configuration's ability to deploy CubeSat secondary payloads, creating new opportunities for low-cost access to deep space. Development work is also underway on future upgrades to SLS, which will culminate in about a decade in the Block 2 configuration, capable of delivering 130 metric tons to LEO via the addition of advanced boosters. As the first SLS draws closer to launch, NASA continues to refine plans for the human deep-space exploration it will enable. Planning currently focuses on use of the vehicle to assemble a Deep Space Gateway, which would comprise a habitat in the lunar vicinity allowing astronauts to gain experience living and working in deep space, a testbed for new systems and capabilities needed for exploration beyond, and a departure point for NASA and partners to send missions to other destinations. Assembly of the Gateway would be followed by a Deep Space Transport, which would be a vehicle capable of carrying astronauts farther into our solar system and eventually to Mars. This paper will give an overview of SLS' current status and its capabilities, and discuss current utilization planning.
Efficient concepts for large erectable space structures
NASA Technical Reports Server (NTRS)
Card, M. F.; Bush, H. G.; Heard, W. L., Jr.; Mikulas, M. M., Jr.
1978-01-01
The status of Langley Research Center development of the nestable column concept is reviewed including results of member and truss component tests, and planned assembly studies. In addition, more recent studies of alternative member concepts are presented. Preliminary results on relative efficiency of several types of truss-type columns are compared and future test plans discussed.
25. Photograph of a line drawing. SHEET 6AS, FOOTING PLAN ...
25. Photograph of a line drawing. SHEET 6A-S, FOOTING PLAN AND DETAILS; 9-16-1940. Assembly Building for Tank Plant for the Chrysler Corporation, Macomb County, Michigan. Design: Miehls. Delineators: G. H. M. and W. G. M. - Detroit Arsenal, 6501 East Eleven Mile Road, Warren, Macomb County, MI
Code of Federal Regulations, 2013 CFR
2013-10-01
..., repackagers, relabelers, and kit assemblers) that do not hold title to any covered drug, device, biological or... sister corporations. Covered device means any device for which payment is available under Title XVIII of the Act or under a State plan under Title XIX or XXI of the Act (or a waiver of such plan), either...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., repackagers, relabelers, and kit assemblers) that do not hold title to any covered drug, device, biological or... sister corporations. Covered device means any device for which payment is available under Title XVIII of the Act or under a State plan under Title XIX or XXI of the Act (or a waiver of such plan), either...
ERIC Educational Resources Information Center
Campbell, Dale F.; Basham, Matthew J.
2007-01-01
Three focus groups consisting of 42 board of trustee members, community college presidents, senior administrators, and faculty members developed critical issues facing community colleges with respect to instructional planning and services; planning, governance, finance; and workforce development. Thereafter, the delegation of more than 200 voted…
Kinematic path planning for space-based robotics
NASA Astrophysics Data System (ADS)
Seereeram, Sanjeev; Wen, John T.
1998-01-01
Future space robotics tasks require manipulators of significant dexterity, achievable through kinematic redundancy and modular reconfigurability, but with a corresponding complexity of motion planning. Existing research aims for full autonomy and completeness, at the expense of efficiency, generality or even user friendliness. Commercial simulators require user-taught joint paths-a significant burden for assembly tasks subject to collision avoidance, kinematic and dynamic constraints. Our research has developed a Kinematic Path Planning (KPP) algorithm which bridges the gap between research and industry to produce a powerful and useful product. KPP consists of three key components: path-space iterative search, probabilistic refinement, and an operator guidance interface. The KPP algorithm has been successfully applied to the SSRMS for PMA relocation and dual-arm truss assembly tasks. Other KPP capabilities include Cartesian path following, hybrid Cartesian endpoint/intermediate via-point planning, redundancy resolution and path optimization. KPP incorporates supervisory (operator) input at any detail to influence the solution, yielding desirable/predictable paths for multi-jointed arms, avoiding obstacles and obeying manipulator limits. This software will eventually form a marketable robotic planner suitable for commercialization in conjunction with existing robotic CAD/CAM packages.
Design and Test Plans for a Non-Nuclear Fission Power System Technology Demonstration Unit
NASA Technical Reports Server (NTRS)
Mason, Lee; Palac, Donald; Gibson, Marc; Houts, Michael; Warren, John; Werner, James; Poston, David; Qualls, Arthur Lou; Radel, Ross; Harlow, Scott
2012-01-01
A joint National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) team is developing concepts and technologies for affordable nuclear Fission Power Systems (FPSs) to support future exploration missions. A key deliverable is the Technology Demonstration Unit (TDU). The TDU will assemble the major elements of a notional FPS with a non-nuclear reactor simulator (Rx Sim) and demonstrate system-level performance in thermal vacuum. The Rx Sim includes an electrical resistance heat source and a liquid metal heat transport loop that simulates the reactor thermal interface and expected dynamic response. A power conversion unit (PCU) generates electric power utilizing the liquid metal heat source and rejects waste heat to a heat rejection system (HRS). The HRS includes a pumped water heat removal loop coupled to radiator panels suspended in the thermal-vacuum facility. The basic test plan is to subject the system to realistic operating conditions and gather data to evaluate performance sensitivity, control stability, and response characteristics. Upon completion of the testing, the technology is expected to satisfy the requirements for Technology Readiness Level 6 (System Demonstration in an Operational and Relevant Environment) based on the use of high-fidelity hardware and prototypic software tested under realistic conditions and correlated with analytical predictions.
Design and Test Plans for a Non-Nuclear Fission Power System Technology Demonstration Unit
NASA Astrophysics Data System (ADS)
Mason, L.; Palac, D.; Gibson, M.; Houts, M.; Warren, J.; Werner, J.; Poston, D.; Qualls, L.; Radel, R.; Harlow, S.
A joint National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) team is developing concepts and technologies for affordable nuclear Fission Power Systems (FPSs) to support future exploration missions. A key deliverable is the Technology Demonstration Unit (TDU). The TDU will assemble the major elements of a notional FPS with a non-nuclear reactor simulator (Rx Sim) and demonstrate system-level performance in thermal vacuum. The Rx Sim includes an electrical resistance heat source and a liquid metal heat transport loop that simulates the reactor thermal interface and expected dynamic response. A power conversion unit (PCU) generates electric power utilizing the liquid metal heat source and rejects waste heat to a heat rejection system (HRS). The HRS includes a pumped water heat removal loop coupled to radiator panels suspended in the thermal-vacuum facility. The basic test plan is to subject the system to realistic operating conditions and gather data to evaluate performance sensitivity, control stability, and response characteristics. Upon completion of the testing, the technology is expected to satisfy the requirements for Technology Readiness Level 6 (System Demonstration in an Operational and Relevant Environment) based on the use of high-fidelity hardware and prototypic software tested under realistic conditions and correlated with analytical predictions.
An assessment of the government liquid hydrogen requirements for the 1995-2005 time frame
NASA Technical Reports Server (NTRS)
Bain, Addison
1990-01-01
The results of government study of long range liquid hydrogen (LH2) requirements for the time period of 1995 through the year 2005 are presented. To assure an adequate supply of LH2 is available in support of various programs, it is imperative a long range projection of LH2 requirements be developed and maintained. This information is vital in planning for necessary procurement actions and assuring adequate industry lead time to acquiring the necessary production and distribution capabilities. The Advanced Launch System and High-Altitude Long-Endurance programs may represent the predominant government needs for LH2 in the long range. The assembled data clearly indicates a need for KSC (Kennedy Space Center) constant program/project surveillance. Also clear is the need for KSC to monitor industry's plans for LH2 plant production and distribution expansion.
Volatility of aerosols in the western European environment. Interim report No. 1 thru 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jennings, S.G.
1987-10-01
The volatility apparatus to be used in the proposed work is being currently assembled at the Atmospheric Sciences Laboratory, White Sands Missile Range, New Mexico. When the volatility apparatus is constructed and tested it will be shipped to University College Galway. It is then planned to carry out field-volatility measurements of the ambient aerosol, primarily for the unmodified maritime air mass and secondly for the partially modified European continental air mass. Continuous measurements for periods up to some weeks spanning all four seasons are planned. In preparation for these measurements, a digital readout facility was acquired for the IM 146more » velocity and direction transmitter to be used for recording wind speed and direction. The measurement system was electronically processed to facilitate continuous recording on a microcomputer.« less
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. At Launch Complex 39B, technicians in Space Shuttle Discovery's payload bay perform a borescope inspection of the retract link assembly on the orbiter's main landing gear door. The inspection is a precautionary measure after a small crack was found in a retract link assembly on the right-hand main landing gear on orbiter Atlantis. An initial review of the closeout photos of the link assembly on Discovery did not reveal any cracks. Discovery is scheduled to return the Space Shuttle fleet to operational status on mission STS-114. This additional work does not impact the launch planning window of July 13-31.
Construction and assembly of the wire planes for the MicroBooNE Time Projection Chamber
DOE Office of Scientific and Technical Information (OSTI.GOV)
Acciarri, R.; Adams, C.; Asaadi, J.
In this paper we describe how the readout planes for the MicroBooNE Time Projection Chamber were constructed, assembled and installed. We present the individual wire preparation using semi-automatic winding machines and the assembly of wire carrier boards. The details of the wire installation on the detector frame and the tensioning of the wires are given. A strict quality assurance plan ensured the integrity of the readout planes. The different tests performed at all stages of construction and installation provided crucial information to achieve the successful realization of the MicroBooNE wire planes.
Red Plague Control Plan (RPCP)
NASA Technical Reports Server (NTRS)
Cooke, Robert W.
2010-01-01
SCOPE: Prescribes the minimum requirements for the control of cuprous / cupric oxide corrosion (a.k.a. Red Plague) of silver-coated copper wire, cable, and harness assemblies. PURPOSE: Targeted for applications where exposure to assembly processes, environmental conditions, and contamination may promote the development of cuprous / cupric oxide corrosion (a.k.a. Red Plague) in silver-coated copper wire, cable, and harness assemblies. Does not exclude any alternate or contractor-proprietary documents or processes that meet or exceed the baseline of requirements established by this document. Use of alternate or contractor-proprietary documents or processes shall require review and prior approval of the procuring NASA activity.
Development and Testing of the Orion CEV Parachute Assembly System (CPAS)
NASA Technical Reports Server (NTRS)
Lichodziejewski, David; Taylor, Anthony P.; Sinclair, Robert; Olmstead, Randy; Kelley, Christopher; Johnson, Justin; Melgares, Michael; Morris, Aaron; Bledsoe, Kristin
2009-01-01
The Crew Exploration Vehicle (CEV) is an element of the Constellation Program that includes launch vehicles, spacecraft, and ground systems needed to embark on a robust space exploration program. As an anchoring capability of the Constellation Program, the CEV shall be human-rated and will carry human crews and cargo from Earth into space and back again. Coupled with transfer stages, landing vehicles, and surface exploration systems, the CEV will serve as an essential component of the architecture that supports human voyages to the Moon and beyond. In addition, the CEV will be modified, as required, to support International Space Station (ISS) mission requirements for crewed and pressurized cargo configurations. Headed by Johnson Space Center (JSC), NASA selected Jacobs Engineering as the support contractor to manage the overall CEV Parachute Assembly System (CPAS) program development. Airborne Systems was chosen to develop the parachute system components. General Dynamics Ordnance and Tactical Systems (GD-OTS) was subcontracted to Airborne Systems to provide the mortar systems. Thus the CPAS development team of JSC, Jacobs, Airborne Systems and GD-OTS was formed. The CPAS team has completed the first phase, or Generation I, of the design, fabrication, and test plan. This paper presents an overview of the CPAS program including system requirements and the development of the second phase, known as the Engineering Development Unit (EDU) architecture. We also present top level results of the tests completed to date. A significant number of ground and flight tests have been completed since the last CPAS presentation at the 2007 AIAA ADS Conference.
NASA Astrophysics Data System (ADS)
Nie, Xiang-Kun; Xu, Yi-Ting; Song, Zhi-Ling; Ding, Ding; Gao, Feng; Liang, Hao; Chen, Long; Bian, Xia; Chen, Zhuo; Tan, Weihong
2014-10-01
Molecular self-assembly, a process to design molecular entities to aggregate into desired structures, represents a promising bottom-up route towards precise construction of functional systems. Here we report a multifunctional, self-assembled system based on magnetic-graphitic-nanocapsule (MGN) templated diacetylene assembly and photopolymerization. The as-prepared assembly system maintains the unique color and fluorescence change properties of the polydiacetylene (PDA) polymers, while also pursues the superior Raman, NIR, magnetic and superconducting properties from the MGN template. Based on both fluorescence and magnetic resonance imaging (MRI) T2 relaxivity, the MGN@PDA system could efficiently monitor the pH variations which could be used as a pH sensor. The MGN@PDA system further demonstrates potential as unique ink for anti-counterfeiting applications. Reversible color change, strong and unique Raman scattering and fluorescence emission, sensitive NIR thermal response, and distinctive magnetic properties afford this assembly system with multicoded anti-counterfeiting capabilities.Molecular self-assembly, a process to design molecular entities to aggregate into desired structures, represents a promising bottom-up route towards precise construction of functional systems. Here we report a multifunctional, self-assembled system based on magnetic-graphitic-nanocapsule (MGN) templated diacetylene assembly and photopolymerization. The as-prepared assembly system maintains the unique color and fluorescence change properties of the polydiacetylene (PDA) polymers, while also pursues the superior Raman, NIR, magnetic and superconducting properties from the MGN template. Based on both fluorescence and magnetic resonance imaging (MRI) T2 relaxivity, the MGN@PDA system could efficiently monitor the pH variations which could be used as a pH sensor. The MGN@PDA system further demonstrates potential as unique ink for anti-counterfeiting applications. Reversible color change, strong and unique Raman scattering and fluorescence emission, sensitive NIR thermal response, and distinctive magnetic properties afford this assembly system with multicoded anti-counterfeiting capabilities. Electronic supplementary information (ESI) available. See DOI: 10.1039/c4nr03837a
NASA Technical Reports Server (NTRS)
Vanvalkenburgh, C. N.
1984-01-01
Underwater simulations of EVA contingency operations such as manual jettison, payload disconnect, and payload clamp actuation were used to define crew aid needs and mockup pecularities and characteristics to verify the validity of simulation using the trainer. A set of mockup instrument pointing system tests was conducted and minor modifications and refinements were made. Flight configuration struts were tested and verified to be operable by the flight crew. Tasks involved in developing the following end items are described: IPS gimbal system, payload, and payload clamp assembly; the igloos (volumetric); spacelab pallets, experiments, and hardware; experiment, and hardware; experiment 7; and EVA hand tools, support hardware (handrails and foot restraints). The test plan preparation and test support are also covered.
Toward a molecular programming language for algorithmic self-assembly
NASA Astrophysics Data System (ADS)
Patitz, Matthew John
Self-assembly is the process whereby relatively simple components autonomously combine to form more complex objects. Nature exhibits self-assembly to form everything from microscopic crystals to living cells to galaxies. With a desire to both form increasingly sophisticated products and to understand the basic components of living systems, scientists have developed and studied artificial self-assembling systems. One such framework is the Tile Assembly Model introduced by Erik Winfree in 1998. In this model, simple two-dimensional square 'tiles' are designed so that they self-assemble into desired shapes. The work in this thesis consists of a series of results which build toward the future goal of designing an abstracted, high-level programming language for designing the molecular components of self-assembling systems which can perform powerful computations and form into intricate structures. The first two sets of results demonstrate self-assembling systems which perform infinite series of computations that characterize computably enumerable and decidable languages, and exhibit tools for algorithmically generating the necessary sets of tiles. In the next chapter, methods for generating tile sets which self-assemble into complicated shapes, namely a class of discrete self-similar fractal structures, are presented. Next, a software package for graphically designing tile sets, simulating their self-assembly, and debugging designed systems is discussed. Finally, a high-level programming language which abstracts much of the complexity and tedium of designing such systems, while preventing many of the common errors, is presented. The summation of this body of work presents a broad coverage of the spectrum of desired outputs from artificial self-assembling systems and a progression in the sophistication of tools used to design them. By creating a broader and deeper set of modular tools for designing self-assembling systems, we hope to increase the complexity which is attainable. These tools provide a solid foundation for future work in both the Tile Assembly Model and explorations into more advanced models.
Experience using individually supplied heater rods in critical power testing of advanced BWR fuel
DOE Office of Scientific and Technical Information (OSTI.GOV)
Majed, M.; Morback, G.; Wiman, P.
1995-09-01
The ABB Atom FRIGG loop located in Vasteras Sweden has during the last six years given a large experience of critical power measurements for BWR fuel designs using indirectly heated rods with individual power supply. The loop was built in the sixties and designed for maximum 100 bar pressure. Testing up to the mid eighties was performed with directly heated rods using a 9 MW, 80 kA power supply. Providing test data to develop critical power correlations for BWR fuel assemblies requires testing with many radial power distributions over the full range of hydraulic conditions. Indirectly heated rods give largemore » advantages for the testing procedure, particularly convenient for variation of individual rod power. A test method being used at Stern Laboratories (formerly Westinghouse Canada) since the early sixties, allows one fuel assembly to simulate all required radial power distributions. This technique requires reliable indirectly heated rods with independently controlled power supplies and uses insulated electric fuel rod simulators with built-in instrumentation. The FRIGG loop was adapted to this system in 1987. A 4MW power supply with 10 individual units was then installed, and has since been used for testing 24 and 25 rod bundles simulating one subbundle of SVEA-96/100 type fuel assemblies. The experience with the system is very good, as being presented, and it is selected also for a planned upgrading of the facility to 15 MW.« less
Optical Assembly and Characterization System for Nano-Photonics Research
2016-03-01
Unlimited Final Report: Optical Assembly and Characterization System for Nano -Photonics Research The views, opinions and/or findings contained in this...reviewed journals: Final Report: Optical Assembly and Characterization System for Nano -Photonics Research Report Title With this equipment funding support...Assembly and Characterization System for Nano -Photonics Research PI: Prof. Weidong Zhou, University of Texas at Arlington (UTA) 500 S. Cooper St
Modular cathode assemblies and methods of using the same for electrochemical reduction
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiedmeyer, Stanley G.; Barnes, Laurel A.; Williamson, Mark A.
Modular cathode assemblies are useable in electrolytic reduction systems and include a basket through which fluid electrolyte may pass and exchange charge with a material to be reduced in the basket. The basket can be divided into upper and lower sections to provide entry for the material. Example embodiment cathode assemblies may have any shape to permit modular placement at any position in reduction systems. Modular cathode assemblies include a cathode plate in the basket, to which unique and opposite electrical power may be supplied. Example embodiment modular cathode assemblies may have standardized electrical connectors. Modular cathode assemblies may bemore » supported by a top plate of an electrolytic reduction system. Electrolytic oxide reduction systems are operated by positioning modular cathode and anode assemblies at desired positions, placing a material in the basket, and charging the modular assemblies to reduce the metal oxide.« less
Modular cathode assemblies and methods of using the same for electrochemical reduction
Wiedmeyer, Stanley G; Barnes, Laurel A; Williamson, Mark A; Willit, James L
2014-12-02
Modular cathode assemblies are useable in electrolytic reduction systems and include a basket through which fluid electrolyte may pass and exchange charge with a material to be reduced in the basket. The basket can be divided into upper and lower sections to provide entry for the material. Example embodiment cathode assemblies may have any shape to permit modular placement at any position in reduction systems. Modular cathode assemblies include a cathode plate in the basket, to which unique and opposite electrical power may be supplied. Example embodiment modular cathode assemblies may have standardized electrical connectors. Modular cathode assemblies may be supported by a top plate of an electrolytic reduction system. Electrolytic oxide reduction systems are operated by positioning modular cathode and anode assemblies at desired positions, placing a material in the basket, and charging the modular assemblies to reduce the metal oxide.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dobson, D; Churby, A; Krieger, E
2011-07-25
The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtualmore » model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.« less
NASA Technical Reports Server (NTRS)
Ricks, Glen A.
1988-01-01
The assembly test article (ATA) consisted of two live loaded redesigned solid rocket motor (RSRM) segments which were assembled and disassembled to simulate the actual flight segment stacking process. The test assembly joint was flight RSRM design, which included the J-joint insulation design and metal capture feature. The ATA test was performed mid-November through 24 December 1987, at Kennedy Space Center (KSC), Florida. The purpose of the test was: certification that vertical RSRM segment mating and separation could be accomplished without any damage; verification and modification of the procedures in the segment stacking/destacking documents; and certification of various GSE to be used for flight assembly and inspection. The RSRM vertical segment assembly/disassembly is possible without any damage to the insulation, metal parts, or seals. The insulation J-joint contact area was very close to the predicted values. Numerous deviations and changes to the planning documents were made to ensure the flight segments are effectively and correctly stacked. Various GSE were also certified for use on flight segments, and are discussed in detail.
Computer aided system engineering for space construction
NASA Technical Reports Server (NTRS)
Racheli, Ugo
1989-01-01
This viewgraph presentation covers the following topics. Construction activities envisioned for the assembly of large platforms in space (as well as interplanetary spacecraft and bases on extraterrestrial surfaces) require computational tools that exceed the capability of conventional construction management programs. The Center for Space Construction is investigating the requirements for new computational tools and, at the same time, suggesting the expansion of graduate and undergraduate curricula to include proficiency in Computer Aided Engineering (CAE) though design courses and individual or team projects in advanced space systems design. In the center's research, special emphasis is placed on problems of constructability and of the interruptability of planned activity sequences to be carried out by crews operating under hostile environmental conditions. The departure point for the planned work is the acquisition of the MCAE I-DEAS software, developed by the Structural Dynamics Research Corporation (SDRC), and its expansion to the level of capability denoted by the acronym IDEAS**2 currently used for configuration maintenance on Space Station Freedom. In addition to improving proficiency in the use of I-DEAS and IDEAS**2, it is contemplated that new software modules will be developed to expand the architecture of IDEAS**2. Such modules will deal with those analyses that require the integration of a space platform's configuration with a breakdown of planned construction activities and with a failure modes analysis to support computer aided system engineering (CASE) applied to space construction.
Modular anode assemblies and methods of using the same for electrochemical reduction
Wiedmeyer, Stanley G; Barnes, Laurel A; Williamson, Mark A; Willit, James L
2015-02-17
Modular anode assemblies are used in electrolytic oxide reduction systems for scalable reduced metal production via electrolysis. Assemblies include a channel frame connected to several anode rods extending into an electrolyte. An electrical system powers the rods while being insulated from the channel frame. A cooling system removes heat from anode rods and the electrical system. An anode guard attaches to the channel frame to prevent accidental electrocution or damage during handling or repositioning. Each anode rod may be divided into upper and lower sections to permit easy repair and swapping out of lower sections. The modular assemblies may have standardized components to permit placement at multiple points within a reducing system. Example methods may operate an electrolytic oxide reduction system by positioning the modular anode assemblies in the reduction system and applying electrical power to the plurality of anode assemblies.
NASA Astrophysics Data System (ADS)
Wang, Xiaodong; Zhang, Wei; Luo, Yi; Yang, Weimin; Chen, Liang
2013-01-01
In assembly of miniature devices, the position and orientation of the parts to be assembled should be guaranteed during or after assembly. In some cases, the relative position or orientation errors among the parts can not be measured from only one direction using visual method, because of visual occlusion or for the features of parts located in a three-dimensional way. An automatic assembly system for precise miniature devices is introduced. In the modular assembly system, two machine vision systems were employed for measurement of the three-dimensionally distributed assembly errors. High resolution CCD cameras and high position repeatability precision stages were integrated to realize high precision measurement in large work space. The two cameras worked in collaboration in measurement procedure to eliminate the influence of movement errors of the rotational or translational stages. A set of templates were designed for calibration of the vision systems and evaluation of the system's measurement accuracy.
World Ocean Circulation Experiment
NASA Technical Reports Server (NTRS)
Clarke, R. Allyn
1992-01-01
The oceans are an equal partner with the atmosphere in the global climate system. The World Ocean Circulation Experiment is presently being implemented to improve ocean models that are useful for climate prediction both by encouraging more model development but more importantly by providing quality data sets that can be used to force or to validate such models. WOCE is the first oceanographic experiment that plans to generate and to use multiparameter global ocean data sets. In order for WOCE to succeed, oceanographers must establish and learn to use more effective methods of assembling, quality controlling, manipulating and distributing oceanographic data.
Component Reliability Testing of Long-Life Sorption Cryocoolers
NASA Technical Reports Server (NTRS)
Bard, S.; Wu, J.; Karlmann, P.; Mirate, C.; Wade, L.
1994-01-01
This paper summarizes ongoing experiments characterizing the ability of critical sorption cryocooler components to achieve highly reliable operation for long-life space missions. Test data obtained over the past several years at JPL are entirely consistent with achieving ten year life for sorption compressors, electrical heaters, container materials, valves, and various sorbent materials suitable for driving 8 to 180 K refrigeration stages. Test results for various compressor systems are reported. Planned future tests necessary to gain a detailed understanding of the sensitivity of cooler performance and component life to operating constraints, design configurations, and fabrication, assembly and handling techniques, are also discussed.
Hydrogen-Fuel Engine Component Tests Near Completion
NASA Technical Reports Server (NTRS)
2003-01-01
Gaseous hydrogen is burned off at the E1 Test Stand the night of Oct. 7 during a cold-flow test of the fuel turbopump of the Integrated Powerhead Demonstrator (IPD) at NASA Stennis Space Center (SSC). The gaseous hydrogen spins the pump's turbine during the test, which was conducted to verify the pump's performance. Engineers plan one more test before sending the pump to The Boeing Co. for inspection. It will then be returned to SSC for engine system assembly. The IPD is the first reusable hydrogen-fueled advanced engine in development since the Space Shuttle Main Engine.
2001-04-19
Happy to be suiting up for launch, STS-100 Mission Specialist Umberto Guidoni gives thumbs up. Guidoni is with the European Space Agency. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19
Hydrogen-Fuel Engine Component Tests Near Completion
2003-11-05
Gaseous hydrogen is burned off at the E1 Test Stand the night of Oct. 7 during a cold-flow test of the fuel turbopump of the Integrated Powerhead Demonstrator (IPD) at NASA Stennis Space Center (SSC). The gaseous hydrogen spins the pump's turbine during the test, which was conducted to verify the pump's performance. Engineers plan one more test before sending the pump to The Boeing Co. for inspection. It will then be returned to SSC for engine system assembly. The IPD is the first reusable hydrogen-fueled advanced engine in development since the Space Shuttle Main Engine.
2012-06-28
CAPE CANAVERAL, Fla. - Secured inside a transportation container, the Orion crew module arrives at the Operations and Checkout Building at NASA's Kennedy Space Center in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. NASA's Michoud Assembly Facility in New Orleans built the crew module pressure vessel. The Orion production team will prepare the module for flight by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Jim Grossmann
2012-06-29
CAPE CANAVERAL, Fla. - The Orion crew module is unwrapped after its arrival in the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. NASA's Michoud Assembly Facility in New Orleans built the crew module pressure vessel. The Orion production team will prepare the module for flight by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Gianni Woods
2012-06-29
CAPE CANAVERAL, Fla. - The Orion crew module is lowered onto a workstand in the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. NASA's Michoud Assembly Facility in New Orleans built the crew module pressure vessel. The Orion production team will prepare the module for flight by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Gianni Woods
2012-06-28
CAPE CANAVERAL, Fla. - The transportation canister holding the Orion crew module rests on the floor of the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. NASA's Michoud Assembly Facility in New Orleans built the crew module pressure vessel. The Orion production team will prepare the module for flight by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Charisse Nahser
2012-06-28
CAPE CANAVERAL, Fla. - The Orion crew module, packed inside a transportation canister, arrives inside the high bay of the Operations and Checkout Building at NASA's Kennedy Space Center in Florida. Slated for Exploration Flight Test-1, an uncrewed mission planned for 2014, the capsule will travel farther into space than any human spacecraft has gone in more than 40 years. NASA's Michoud Assembly Facility in New Orleans built the crew module pressure vessel. The Orion production team will prepare the module for flight by installing heat-shielding thermal protection systems, avionics and other subsystems. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Jim Grossmann
NASA Astrophysics Data System (ADS)
Ness, P. H.; Jacobson, H.
1984-10-01
The thrust of 'group technology' is toward the exploitation of similarities in component design and manufacturing process plans to achieve assembly line flow cost efficiencies for small batch production. The systematic method devised for the identification of similarities in component geometry and processing steps is a coding and classification scheme implemented by interactive CAD/CAM systems. This coding and classification scheme has led to significant increases in computer processing power, allowing rapid searches and retrievals on the basis of a 30-digit code together with user-friendly computer graphics.
2001-04-19
KENNEDY SPACE CENTER, FLA. -- Spring leaves frame the launch of Space Shuttle Endeavour, trailing flames and billows of smoke and steam, as it roars into the blue sky. Liftoff of the ninth flight to the International Space Station occurred at 2:40:42 p.m. EDT. The 11-day mission will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator System and the UHF Antenna. The mission includes two planned spacewalks for installation of the SSRMS on the Station. Also onboard is the Multi-Purpose Logistics Module Raffaello, carrying resupply stowage racks and resupply/return stowage platforms
Man-rated flight software for the F-8 DFBW program
NASA Technical Reports Server (NTRS)
Bairnsfather, R. R.
1976-01-01
The design, implementation, and verification of the flight control software used in the F-8 DFBW program are discussed. Since the DFBW utilizes an Apollo computer and hardware, the procedures, controls, and basic management techniques employed are based on those developed for the Apollo software system. Program assembly control, simulator configuration control, erasable-memory load generation, change procedures and anomaly reporting are discussed. The primary verification tools are described, as well as the program test plans and their implementation on the various simulators. Failure effects analysis and the creation of special failure generating software for testing purposes are described.
Cathode power distribution system and method of using the same for power distribution
Williamson, Mark A; Wiedmeyer, Stanley G; Koehl, Eugene R; Bailey, James L; Willit, James L; Barnes, Laurel A; Blaskovitz, Robert J
2014-11-11
Embodiments include a cathode power distribution system and/or method of using the same for power distribution. The cathode power distribution system includes a plurality of cathode assemblies. Each cathode assembly of the plurality of cathode assemblies includes a plurality of cathode rods. The system also includes a plurality of bus bars configured to distribute current to each of the plurality of cathode assemblies. The plurality of bus bars include a first bus bar configured to distribute the current to first ends of the plurality of cathode assemblies and a second bus bar configured to distribute the current to second ends of the plurality of cathode assemblies.
Structure Design Approach and Technology Selection for Next Generation European Launchers
NASA Astrophysics Data System (ADS)
Baiocco, P.; Ramusat, G.; Kauffmann, J.; Jaredson, D.; Bouilly, Th.; Lavelle, F.; Louaas, E.
2012-07-01
In the framework of the next generation launchers activity at ESA, a top-down and a bottom-up approach has been performed for the alternative conception and promising technologies of NGL sub-assemblies and sub-systems. The top-down approach consisted in looking for system-driven design solutions and the bottom-up in the proposal of design solutions taking to substantial advantages for the system. The main investigations have been focused on structures and technologies tight to structures and interfaces. Specifications coming from a preliminary system design have been used in order to permit sub-system design with the goal to find the major advantage for the overall launch system. In this respect selection criteria have been identified and among these a specific evaluation of the payload mass over recurring cost advantage has been evaluated. The development cost, recurring cost and operational aspects have been considered as competitiveness factors for the identification of the most interesting solutions. The TRL/IRL has been assessed and a preliminary development plan has been identified. This approach is dedicated to reference NGL architectures, but alternative architectures have been investigated in order to assess their interest in terms of competitiveness factors and study of other technologies. This paper deals mainly with metallic and composite structures owing to sub-systems or sub-assemblies proposed for the NGL. The major sub-systems and structures analysed are the engine thrust frame (ETF), inter stage structures (ISS), cryogenic propellant tanks, feeding lines and attachments, pressurisation systems and fairing. The paper provides an overview of the main results of this investigation and the potential benefit it can provide.
DOE LeRC photovoltaic systems test facility
NASA Technical Reports Server (NTRS)
Cull, R. C.; Forestieri, A. F.
1978-01-01
The facility was designed and built and is being operated as a national facility to serve the needs of the entire DOE National Photovoltaic Program. The object of the facility is to provide a place where photovoltaic systems may be assembled and electrically configured, without specific physical configuration, for operation and testing to evaluate their performance and characteristics. The facility as a breadboard system allows investigation of operational characteristics and checkout of components, subsystems and systems before they are mounted in field experiments or demonstrations. The facility as currently configured consist of 10 kW of solar arrays built from modules, two inverter test stations, a battery storage system, interface with local load and the utility grid, and instrumentation and control necessary to make a flexible operating facility. Expansion to 30 kW is planned for 1978. Test results and operating experience are summaried to show the variety of work that can be done with this facility.
NASA Astrophysics Data System (ADS)
Nored, Donald L.
Viewgraphs on Space Station Freedom Electrical Power System (EPS) WP-40 are presented. Topics covered include: key EPS technical requirements; photovoltaic power module systems; solar array assembly; blanket containment box and box positioning subassemblies; solar cell; bypass diode assembly; Kapton with atomic oxygen resistant coating; sequential shunt unit; gimbal assembly; energy storage subsystem; thermal control subsystem; direct current switching unit; integrated equipment assembly; PV cargo element; PMAD system; and PMC and AC architecture.
NASA Technical Reports Server (NTRS)
Nored, Donald L.
1990-01-01
Viewgraphs on Space Station Freedom Electrical Power System (EPS) WP-40 are presented. Topics covered include: key EPS technical requirements; photovoltaic power module systems; solar array assembly; blanket containment box and box positioning subassemblies; solar cell; bypass diode assembly; Kapton with atomic oxygen resistant coating; sequential shunt unit; gimbal assembly; energy storage subsystem; thermal control subsystem; direct current switching unit; integrated equipment assembly; PV cargo element; PMAD system; and PMC and AC architecture.
Probabilistic Analysis of Pattern Formation in Monotonic Self-Assembly
Moore, Tyler G.; Garzon, Max H.; Deaton, Russell J.
2015-01-01
Inspired by biological systems, self-assembly aims to construct complex structures. It functions through piece-wise, local interactions among component parts and has the potential to produce novel materials and devices at the nanoscale. Algorithmic self-assembly models the product of self-assembly as the output of some computational process, and attempts to control the process of assembly algorithmically. Though providing fundamental insights, these computational models have yet to fully account for the randomness that is inherent in experimental realizations, which tend to be based on trial and error methods. In order to develop a method of analysis that addresses experimental parameters, such as error and yield, this work focuses on the capability of assembly systems to produce a pre-determined set of target patterns, either accurately or perhaps only approximately. Self-assembly systems that assemble patterns that are similar to the targets in a significant percentage are “strong” assemblers. In addition, assemblers should predominantly produce target patterns, with a small percentage of errors or junk. These definitions approximate notions of yield and purity in chemistry and manufacturing. By combining these definitions, a criterion for efficient assembly is developed that can be used to compare the ability of different assembly systems to produce a given target set. Efficiency is a composite measure of the accuracy and purity of an assembler. Typical examples in algorithmic assembly are assessed in the context of these metrics. In addition to validating the method, they also provide some insight that might be used to guide experimentation. Finally, some general results are established that, for efficient assembly, imply that every target pattern is guaranteed to be assembled with a minimum common positive probability, regardless of its size, and that a trichotomy exists to characterize the global behavior of typical efficient, monotonic self-assembly systems in the literature. PMID:26421616
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kulvatunyou, Boonserm; Wysk, Richard A.; Cho, Hyunbo
2004-06-01
In today's global manufacturing environment, manufacturing functions are distributed as never before. Design, engineering, fabrication, and assembly of new products are done routinely in many different enterprises scattered around the world. Successful business transactions require the sharing of design and engineering data on an unprecedented scale. This paper describes a framework that facilitates the collaboration of engineering tasks, particularly process planning and analysis, to support such globalized manufacturing activities. The information models of data and the software components that integrate those information models are described. The integration framework uses an Integrated Product and Process Data (IPPD) representation called a Resourcemore » Independent Operation Summary (RIOS) to facilitate the communication of business and manufacturing requirements. Hierarchical process modeling, process planning decomposition and an augmented AND/OR directed graph are used in this representation. The Resource Specific Process Planning (RSPP) module assigns required equipment and tools, selects process parameters, and determines manufacturing costs based on two-level hierarchical RIOS data. The shop floor knowledge (resource and process knowledge) and a hybrid approach (heuristic and linear programming) to linearize the AND/OR graph provide the basis for the planning. Finally, a prototype system is developed and demonstrated with an exemplary part. Java and XML (Extensible Markup Language) are used to ensure software and information portability.« less
Kumar, M Senthil; Schwartz, Russell
2010-12-09
Virus capsid assembly has been a key model system for studies of complex self-assembly but it does pose some significant challenges for modeling studies. One important limitation is the difficulty of determining accurate rate parameters. The large size and rapid assembly of typical viruses make it infeasible to directly measure coat protein binding rates or deduce them from the relatively indirect experimental measures available. In this work, we develop a computational strategy to deduce coat-coat binding rate parameters for viral capsid assembly systems by fitting stochastic simulation trajectories to experimental measures of assembly progress. Our method combines quadratic response surface and quasi-gradient descent approximations to deal with the high computational cost of simulations, stochastic noise in simulation trajectories and limitations of the available experimental data. The approach is demonstrated on a light scattering trajectory for a human papillomavirus (HPV) in vitro assembly system, showing that the method can provide rate parameters that produce accurate curve fits and are in good concordance with prior analysis of the data. These fits provide an insight into potential assembly mechanisms of the in vitro system and give a basis for exploring how these mechanisms might vary between in vitro and in vivo assembly conditions.
NASA Astrophysics Data System (ADS)
Senthil Kumar, M.; Schwartz, Russell
2010-12-01
Virus capsid assembly has been a key model system for studies of complex self-assembly but it does pose some significant challenges for modeling studies. One important limitation is the difficulty of determining accurate rate parameters. The large size and rapid assembly of typical viruses make it infeasible to directly measure coat protein binding rates or deduce them from the relatively indirect experimental measures available. In this work, we develop a computational strategy to deduce coat-coat binding rate parameters for viral capsid assembly systems by fitting stochastic simulation trajectories to experimental measures of assembly progress. Our method combines quadratic response surface and quasi-gradient descent approximations to deal with the high computational cost of simulations, stochastic noise in simulation trajectories and limitations of the available experimental data. The approach is demonstrated on a light scattering trajectory for a human papillomavirus (HPV) in vitro assembly system, showing that the method can provide rate parameters that produce accurate curve fits and are in good concordance with prior analysis of the data. These fits provide an insight into potential assembly mechanisms of the in vitro system and give a basis for exploring how these mechanisms might vary between in vitro and in vivo assembly conditions.
De novo assembly of plant body plan: a step ahead of Deadpool.
Kareem, Abdul; Radhakrishnan, Dhanya; Sondhi, Yash; Aiyaz, Mohammed; Roy, Merin V; Sugimoto, Kaoru; Prasad, Kalika
2016-08-01
While in the movie Deadpool it is possible for a human to recreate an arm from scratch, in reality plants can even surpass that. Not only can they regenerate lost parts, but also the whole plant body can be reborn from a few existing cells. Despite the decades old realization that plant cells possess the ability to regenerate a complete shoot and root system, it is only now that the underlying mechanisms are being unraveled. De novo plant regeneration involves the initiation of regenerative mass, acquisition of the pluripotent state, reconstitution of stem cells and assembly of regulatory interactions. Recent studies have furthered our understanding on the making of a complete plant system in the absence of embryonic positional cues. We review the recent studies probing the molecular mechanisms of de novo plant regeneration in response to external inductive cues and our current knowledge of direct reprogramming of root to shoot and vice versa. We further discuss how de novo regeneration can be exploited to meet the demands of green culture industries and to serve as a general model to address the fundamental questions of regeneration across the plant kingdom.
De novo assembly of plant body plan: a step ahead of Deadpool
Kareem, Abdul; Radhakrishnan, Dhanya; Sondhi, Yash; Aiyaz, Mohammed; Roy, Merin V.; Sugimoto, Kaoru
2016-01-01
Abstract While in the movie Deadpool it is possible for a human to recreate an arm from scratch, in reality plants can even surpass that. Not only can they regenerate lost parts, but also the whole plant body can be reborn from a few existing cells. Despite the decades old realization that plant cells possess the ability to regenerate a complete shoot and root system, it is only now that the underlying mechanisms are being unraveled. De novo plant regeneration involves the initiation of regenerative mass, acquisition of the pluripotent state, reconstitution of stem cells and assembly of regulatory interactions. Recent studies have furthered our understanding on the making of a complete plant system in the absence of embryonic positional cues. We review the recent studies probing the molecular mechanisms of de novo plant regeneration in response to external inductive cues and our current knowledge of direct reprogramming of root to shoot and vice versa. We further discuss how de novo regeneration can be exploited to meet the demands of green culture industries and to serve as a general model to address the fundamental questions of regeneration across the plant kingdom. PMID:27800169
Human space flight and future major space astrophysics missions: servicing and assembly
NASA Astrophysics Data System (ADS)
Thronson, Harley; Peterson, Bradley M.; Greenhouse, Matthew; MacEwen, Howard; Mukherjee, Rudranarayan; Polidan, Ronald; Reed, Benjamin; Siegler, Nicholas; Smith, Hsiao
2017-09-01
Some concepts for candidate future "flagship" space observatories approach the payload limits of the largest launch vehicles planned for the next few decades, specifically in the available volume in the vehicle fairing. This indicates that an alternative to autonomous self-deployment similar to that of the James Webb Space Telescope will eventually be required. Moreover, even before this size limit is reached, there will be significant motivation to service, repair, and upgrade in-space missions of all sizes, whether to extend the life of expensive facilities or to replace outworn or obsolete onboard systems as was demonstrated so effectively by the Hubble Space Telescope program. In parallel with these challenges to future major space astronomy missions, the capabilities of in-space robotic systems and the goals for human space flight in the 2020s and 2030s offer opportunities for achieving the most exciting science goals of the early 21st Century. In this paper, we summarize the history of concepts for human operations beyond the immediate vicinity of the Earth, the importance of very large apertures for scientific discovery, and current capabilities and future developments in robot- and astronaut-enabled servicing and assembly.
SSME component assembly and life management expert system
NASA Technical Reports Server (NTRS)
Ali, M.; Dietz, W. E.; Ferber, H. J.
1989-01-01
The space shuttle utilizes several rocket engine systems, all of which must function with a high degree of reliability for successful mission completion. The space shuttle main engine (SSME) is by far the most complex of the rocket engine systems and is designed to be reusable. The reusability of spacecraft systems introduces many problems related to testing, reliability, and logistics. Components must be assembled from parts inventories in a manner which will most effectively utilize the available parts. Assembly must be scheduled to efficiently utilize available assembly benches while still maintaining flight schedules. Assembled components must be assigned to as many contiguous flights as possible, to minimize component changes. Each component must undergo a rigorous testing program prior to flight. In addition, testing and assembly of flight engines and components must be done in conjunction with the assembly and testing of developmental engines and components. The development, testing, manufacture, and flight assignments of the engine fleet involves the satisfaction of many logistical and operational requirements, subject to many constraints. The purpose of the SSME Component Assembly and Life Management Expert System (CALMES) is to assist the engine assembly and scheduling process, and to insure that these activities utilize available resources as efficiently as possible.
Overview of crew member energy expenditure during Shuttle Flight 61-8 EASE/ACCESS task performance
NASA Technical Reports Server (NTRS)
Horrigan, D. J.; Waligora, J. W.; Stanford, J.; Edwards, B. F.
1987-01-01
The energy expenditure of the Shuttle Flight 61-B crewmembers during the extravehicular performance of Experimental Assembly of Structures in EVA (EASE) and Assembly Concept of Construction of Space Structures (ACCESS) construction system tasks are reported. These data consist of metabolic rate time profiles correlated with specific EASE and ACCESS tasks and crew comments. Average extravehicular activity metabolic rates are computed and compared with those reported from previous Apollo, Shylab, and Shuttle flights. These data reflect total energy expenditure and not that of individual muscle groups such as hand and forearm. When correlated with specific EVA tasks and subtasks, the metabolic profile data is expected to be useful in planning future EVA protocols. For example, after experiencing high work rates and apparent overheating during some Gemini EVAs, it was found useful to carefully monitor work rates in subsequent flights to assess the adequacy of cooling garments and as an aid to preplanning EVA procedures. This presentation is represented by graphs and charts.
InSight Cruise Stage and Lander in Assembly
2015-05-27
Spacecraft specialists in a clean room at Lockheed Martin Space Systems, Denver, are working on NASA's InSight spacecraft in this January 2015 scene from the mission's assembly and testing phase. At center is the cruise stage, which will serve multiple functions during the flight from Earth to Mars. In the background is the InSight lander. InSight, for Interior Exploration Using Seismic Investigations, Geodesy and Heat Transport, will investigate the deep interior of Mars to gain information about how rocky planets, including Earth, formed and evolved. The mission is scheduled for launch from California in March 2016 and landing on Mars in September 2016. Note: After thorough examination, NASA managers have decided to suspend the planned March 2016 launch of the Interior Exploration using Seismic Investigations Geodesy and Heat Transport (InSight) mission. The decision follows unsuccessful attempts to repair a leak in a section of the prime instrument in the science payload. http://photojournal.jpl.nasa.gov/catalog/PIA19403
High-accuracy microassembly by intelligent vision systems and smart sensor integration
NASA Astrophysics Data System (ADS)
Schilp, Johannes; Harfensteller, Mark; Jacob, Dirk; Schilp, Michael
2003-10-01
Innovative production processes and strategies from batch production to high volume scale are playing a decisive role in generating microsystems economically. In particular assembly processes are crucial operations during the production of microsystems. Due to large batch sizes many microsystems can be produced economically by conventional assembly techniques using specialized and highly automated assembly systems. At laboratory stage microsystems are mostly assembled by hand. Between these extremes there is a wide field of small and middle sized batch production wherefore common automated solutions rarely are profitable. For assembly processes at these batch sizes a flexible automated assembly system has been developed at the iwb. It is based on a modular design. Actuators like grippers, dispensers or other process tools can easily be attached due to a special tool changing system. Therefore new joining techniques can easily be implemented. A force-sensor and a vision system are integrated into the tool head. The automated assembly processes are based on different optical sensors and smart actuators like high-accuracy robots or linear-motors. A fiber optic sensor is integrated in the dispensing module to measure contactless the clearance between the dispense needle and the substrate. Robot vision systems using the strategy of optical pattern recognition are also implemented as modules. In combination with relative positioning strategies, an assembly accuracy of the assembly system of less than 3 μm can be realized. A laser system is used for manufacturing processes like soldering.
jsc2018m000297_Investigation_Seeks_to_Create_Self-Assembling_Materials-MP4
2018-05-14
Investigation Seeks to Create Self-Assembling Materials------ As we travel farther into space, clever solutions to problems like engine part malfunctions and other possible mishaps will be a vital part of the planning process. 3D printing, or additive manufacturing, is an emerging technology that may be used to custom-create mission-critical parts. An integral piece of this process is understanding how particle shape, size distribution and packing behavior affect the manufacturing process. The Advanced Colloids Experiment-Temperature-7 investigation (ACE-T-7) aboard the International Space Station explores the feasibility of creating self-assembling microscopic particles for use in the manufacturing of materials during spaceflight. Read more about ACE-T-& here: https://www.nasa.gov/feature/investigation-seeks-to-create-self-assembling-materials
Instrumentation to Aid in Steel Bridge Fabrication : Bridge Virtual Assembly System
DOT National Transportation Integrated Search
2018-05-01
This pool funded project developed a BRIDGE VIRTUAL ASSEMBLY SYSTEM (BRIDGE VAS) that improves manufacturing processes and enhances quality control for steel bridge fabrication. The system replaces conventional match-drilling with virtual assembly me...
Engine with exhaust gas recirculation system and variable geometry turbocharger
Keating, Edward J.
2015-11-03
An engine assembly includes an intake assembly, an internal combustion engine defining a plurality of cylinders and configured to combust a fuel and produce exhaust gas, and an exhaust assembly in fluid communication with a first subset of the plurality of cylinders. Each of the plurality of cylinders are provided in fluid communication with the intake assembly. The exhaust assembly is provided in fluid communication with a first subset of the plurality of cylinders, and a dedicated exhaust gas recirculation system in fluid communication with both a second subset of the plurality of cylinders and with the intake assembly. The dedicated exhaust gas recirculation system is configured to route all of the exhaust gas from the second subset of the plurality of cylinders to the intake assembly. Finally, the engine assembly includes a turbocharger having a variable geometry turbine in fluid communication with the exhaust assembly.
NASA Technical Reports Server (NTRS)
Young, Ken (Inventor); Hindle, Timothy (Inventor); Barber, Tim Daniel (Inventor)
2016-01-01
Mounting systems for structural members, fastening assemblies thereof, and vibration isolation systems including the same are provided. Mounting systems comprise a pair of mounting brackets, each clamped against a fastening assembly forming a mounting assembly. Fastening assemblies comprise a spherical rod end comprising a spherical member having a through opening and an integrally threaded shaft, first and second seating members on opposite sides of the spherical member and each having a through opening that is substantially coaxial with the spherical member through opening, and a partially threaded fastener that threadably engages each mounting bracket forming the mounting assembly. Structural members have axial end portions, each releasably coupled to a mounting bracket by the integrally threaded shaft. Axial end portions are threaded in opposite directions for permitting structural member rotation to adjust a length thereof to a substantially zero strain position. Structural members may be vibration isolator struts in vibration isolation systems.
The Ames-Lockheed orbiter processing scheduling system
NASA Technical Reports Server (NTRS)
Zweben, Monte; Gargan, Robert
1991-01-01
A general purpose scheduling system and its application to Space Shuttle Orbiter Processing at the Kennedy Space Center (KSC) are described. Orbiter processing entails all the inspection, testing, repair, and maintenance necessary to prepare the Shuttle for launch and takes place within the Orbiter Processing Facility (OPF) at KSC, the Vehicle Assembly Building (VAB), and on the launch pad. The problems are extremely combinatoric in that there are thousands of tasks, resources, and other temporal considerations that must be coordinated. Researchers are building a scheduling tool that they hope will be an integral part of automating the planning and scheduling process at KSC. The scheduling engine is domain independent and is also being applied to Space Shuttle cargo processing problems as well as wind tunnel scheduling problems.
Standardized Modular Power Interfaces for Future Space Explorations Missions
NASA Technical Reports Server (NTRS)
Oeftering, Richard
2015-01-01
Earlier studies show that future human explorations missions are composed of multi-vehicle assemblies with interconnected electric power systems. Some vehicles are often intended to serve as flexible multi-purpose or multi-mission platforms. This drives the need for power architectures that can be reconfigured to support this level of flexibility. Power system developmental costs can be reduced, program wide, by utilizing a common set of modular building blocks. Further, there are mission operational and logistics cost benefits of using a common set of modular spares. These benefits are the goals of the Advanced Exploration Systems (AES) Modular Power System (AMPS) project. A common set of modular blocks requires a substantial level of standardization in terms of the Electrical, Data System, and Mechanical interfaces. The AMPS project is developing a set of proposed interface standards that will provide useful guidance for modular hardware developers but not needlessly constrain technology options, or limit future growth in capability. In 2015 the AMPS project focused on standardizing the interfaces between the elements of spacecraft power distribution and energy storage. The development of the modular power standard starts with establishing mission assumptions and ground rules to define design application space. The standards are defined in terms of AMPS objectives including Commonality, Reliability-Availability, Flexibility-Configurability and Supportability-Reusability. The proposed standards are aimed at assembly and sub-assembly level building blocks. AMPS plans to adopt existing standards for spacecraft command and data, software, network interfaces, and electrical power interfaces where applicable. Other standards including structural encapsulation, heat transfer, and fluid transfer, are governed by launch and spacecraft environments and bound by practical limitations of weight and volume. Developing these mechanical interface standards is more difficult but an essential part of defining physical building blocks of modular power. This presentation describes the AMPS projects progress towards standardized modular power interfaces.
Georgia Institute of Technology chilled water system evaluation and master plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-05-15
As the host of the Olympic Village for the 1996 Atlanta Olympics, Georgia Tech has experienced a surge in construction activities over the last three years. Over 1.3 million square feet of new buildings have been constructed on the Georgia Tech campus. This growth has placed a strain on the Georgia Tech community and challenged the facilities support staff charged with planning and organizing utility services. In concert with Olympic construction, utility planners have worked to ensure long term benefits for Georgia Tech facilities while meeting the short term requirements of the Olympic Games. The concentration of building construction inmore » the northwest quadrant of the campus allowed planners to construct a satellite chilled water plant to serve the needs of this area and provide the opportunity to integrate this section of the campus with the main campus chilled water system. This assessment and master plan, funded in part by the US Department of Energy, has evaluated the chilled water infrastructure at Georgia Tech, identified ongoing problems and made recommendations for long term chilled water infrastructure development and efficiency improvements. The Georgia Tech office of Facilities and RDA Engineering, Inc. have worked together to assemble relevant information and prepare the recommendations contained in this document.« less
An Exposure Prevention Plan for an Anhydrous Ammonia Handling System
NASA Technical Reports Server (NTRS)
Padolewski, Cathy L.; Bower, Amy; Ponikvar, Gary; Mellott, Ken
1997-01-01
In July of 1996, the Industrial Hygiene Team of the Environmental Management Office at NASA Lewis Research Center was contacted by the Space Station Program Office to conduct ammonia awareness training for a team of engineers and technicians. The team was tasked with assembling and operating an ammonia handling system for testing of a photovoltaic radiator at the NASA Plum Brook Station Space Power Facility. The ammonia handling system supports a radiator designed to radiate excess heat from a photovoltaic array module used to provide power to the International Space Station. The system would consist of a hazardous materials trailer equipped with an anhydrous ammonia tank, heater, accumulator, chiller, and flow bench. Meetings were held with representatives from the Space Station Program Office, the engineers and Plum Brook safety personnel. Guidance was also provided by representatives from Kennedy Space Center. Determinations were made concerning the locations and types of potential exposures and a plan was developed which included training, personal protective equipment, engineering controls and emergency response. Various organizations including the Plum Brook Safety Committee, the Lewis Environmental Management Office, the Test Readiness Review Board and the Program Office all had requirements that had to be met in order to satisfy themselves that all personnel involved in the operation of the system would be safe. What resulted was a comprehensive plan that provided more than adequate safety measures and succeeded in protecting all personnel from the hazards of the ammonia system. Testing of the photovoltaic radiator was successful and although ammonia leaks were detected and maintenance of the system was ongoing, no one was injured. It was felt that the training and controls in place allowed for a comfort level that did not interfere with the operations.
NASA Astrophysics Data System (ADS)
1990-10-01
The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.
Pilot Fullerton plans menu as packaged food and beverages float around him
NASA Technical Reports Server (NTRS)
1982-01-01
Pilot C. Gordon Fullerton, wearing the communications carrier assembly (ASSY) mini headset (HDST), beings food preparation on the middeck. Canned goods, sealed packages, beverage containers, etc are attached with velcro to meal tray assemblies (secured on middeck forward lockers) and freefloat around Fullerton. JSC water dispenser kit and portrait of G.W.S. Abbey appears behind Fullerton on port side bulkhead and potable water tank appears below him.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. At Launch Complex 39B, a technician in Space Shuttle Discovery's payload bay studies a photo of the retract link assembly on the orbiter's main landing gear door prior to conducting a borescope inspection. The inspection is a precautionary measure after a small crack was found in a retract link assembly on the right-hand main landing gear on orbiter Atlantis. An initial review of the closeout photos of the link assembly on Discovery did not reveal any cracks. Discovery is scheduled to return the Space Shuttle fleet to operational status on mission STS-114. This additional work does not impact the launch planning window of July 13-31.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. At Launch Complex 39B, technicians construct a platform in Space Shuttle Discovery's payload bay to support an upcoming borescope inspection of the retract link assembly on the orbiter's main landing gear door. The inspection is a precautionary measure after a small crack was found in a retract link assembly on the right-hand main landing gear on orbiter Atlantis. An initial review of the closeout photos of the link assembly on Discovery did not reveal any cracks. Discovery is scheduled to return the Space Shuttle fleet to operational status on mission STS-114. This additional work does not impact the launch planning window of July 13-31.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. At Launch Complex 39B, technicians construct a platform in Space Shuttle Discovery's payload bay to support an upcoming borescope inspection of the retract link assembly on the orbiter's main landing gear door. The inspection is a precautionary measure after a small crack was found in a retract link assembly on the right-hand main landing gear on orbiter Atlantis. An initial review of the closeout photos of the link assembly on Discovery did not reveal any cracks. Discovery is scheduled to return the Space Shuttle fleet to operational status on mission STS-114. This additional work does not impact the launch planning window of July 13-31.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. At Launch Complex 39B, technicians construct a platform in Space Shuttle Discovery's payload bay to support an upcoming borescope inspection of the retract link assembly on the orbiter's main landing gear door. The inspection is a precautionary measure after a small crack was found in a retract link assembly on the right-hand main landing gear on orbiter Atlantis. An initial review of the closeout photos of the link assembly on Discovery did not reveal any cracks. Discovery is scheduled to return the Space Shuttle fleet to operational status on mission STS-114. This additional work does not impact the launch planning window of July 13-31.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. At Launch Complex 39B, technicians in Space Shuttle Discovery's payload bay monitor the images received during a borescope inspection of the retract link assembly on the orbiter's main landing gear door. The inspection is a precautionary measure after a small crack was found in a retract link assembly on the right-hand main landing gear on orbiter Atlantis. An initial review of the closeout photos of the link assembly on Discovery did not reveal any cracks. Discovery is scheduled to return the Space Shuttle fleet to operational status on mission STS-114. This additional work does not impact the launch planning window of July 13-31.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. At Launch Complex 39B, a technician in Space Shuttle Discovery's payload bay performs a borescope inspection of the retract link assembly on the orbiter's main landing gear door. The inspection is a precautionary measure after a small crack was found in a retract link assembly on the right-hand main landing gear on orbiter Atlantis. An initial review of the closeout photos of the link assembly on Discovery did not reveal any cracks. Discovery is scheduled to return the Space Shuttle fleet to operational status on mission STS-114. This additional work does not impact the launch planning window of July 13-31.
Finite element analysis of 6 large PMMA skull reconstructions: A multi-criteria evaluation approach
Ridwan-Pramana, Angela; Marcián, Petr; Borák, Libor; Narra, Nathaniel; Forouzanfar, Tymour; Wolff, Jan
2017-01-01
In this study 6 pre-operative designs for PMMA based reconstructions of cranial defects were evaluated for their mechanical robustness using finite element modeling. Clinical experience and engineering principles were employed to create multiple plan options, which were subsequently computationally analyzed for mechanically relevant parameters under 50N loads: stress, strain and deformation in various components of the assembly. The factors assessed were: defect size, location and shape. The major variable in the cranioplasty assembly design was the arrangement of the fixation plates. An additional study variable introduced was the location of the 50N load within the implant area. It was found that in smaller defects, it was simpler to design a symmetric distribution of plates and under limited variability in load location it was possible to design an optimal for expected loads. However, for very large defects with complex shapes, the variability in the load locations introduces complications to the intuitive design of the optimal assembly. The study shows that it can be beneficial to incorporate multi design computational analyses to decide upon the most optimal plan for a clinical case. PMID:28609471
Finite element analysis of 6 large PMMA skull reconstructions: A multi-criteria evaluation approach.
Ridwan-Pramana, Angela; Marcián, Petr; Borák, Libor; Narra, Nathaniel; Forouzanfar, Tymour; Wolff, Jan
2017-01-01
In this study 6 pre-operative designs for PMMA based reconstructions of cranial defects were evaluated for their mechanical robustness using finite element modeling. Clinical experience and engineering principles were employed to create multiple plan options, which were subsequently computationally analyzed for mechanically relevant parameters under 50N loads: stress, strain and deformation in various components of the assembly. The factors assessed were: defect size, location and shape. The major variable in the cranioplasty assembly design was the arrangement of the fixation plates. An additional study variable introduced was the location of the 50N load within the implant area. It was found that in smaller defects, it was simpler to design a symmetric distribution of plates and under limited variability in load location it was possible to design an optimal for expected loads. However, for very large defects with complex shapes, the variability in the load locations introduces complications to the intuitive design of the optimal assembly. The study shows that it can be beneficial to incorporate multi design computational analyses to decide upon the most optimal plan for a clinical case.
On-Line Allocation Of Robot Resources To Task Plans
NASA Astrophysics Data System (ADS)
Lyons, Damian M.
1989-02-01
In this paper, I present an approach to representing plans that make on-line decisions about resource allocation. An on-line decision is the evaluation of a conditional expression involving sensory information as the plan is being executed. I use a plan representation called 7ZS10'1 1,12that has been especially designed for the domain of robot programming, and in particular, for the problem of on-line decisions. The resource allocation example is based on the robot assembly cell architecture outlined by Venkataraman and Lyons16. I begin by setting forth a definition of on-line decision making and some arguments as to why this form of decision making is important and useful. To set the context for the resource allocation example, I take some care in categorizing the types of on-line decision making and the approaches adopted by other workers so far. In particular, I justify a plan-based approach to the study of on-line decision making. From that, the focus shifts to one type of decision making: on-line allocation of robot resources to task plans. Robot resources are the physical manipulators (grippers, wrists, arms, feeders, etc) that are available to carry out the task. I formulate the assembly cell architecture of Venkataraman and Lyons16 as an R.S plan schema, and show how the on-line allocation specified in that architecture can be implemented. Finally, I show how considering the on-line allocation of logical resources, that is a physical resource plus some model information, can be used as a non-traditional approach to some problems in robot task planning.
Development of Geospatial Map Based Portal for Delimitation of Mcd Wards
NASA Astrophysics Data System (ADS)
Gupta, A. Kumar Chandra; Kumar, P.; Sharma, P. Kumar
2017-09-01
The Geospatial Delhi Limited (GSDL), a Govt. of NCT of Delhi Company formed in order to provide the geospatial information of National Capital Territory of Delhi (NCTD) to the Government of National Capital Territory of Delhi (GNCTD) and its organs such as DDA, MCD, DJB, State Election Department, DMRC etc., for the benefit of all citizens of Government of National Capital Territory of Delhi (GNCTD). This paper describes the development of Geospatial Map based Portal for Delimitation of MCD Wards (GMPDW) and election of 3 Municipal Corporations of NCT of Delhi. The portal has been developed as a map based spatial decision support system (SDSS) for delimitation of MCD Wards and draw of peripheral wards boundaries to planning and management of MCD Election process of State Election Commission, and as an MCD election related information searching tools (Polling Station, MCD Wards and Assembly constituency etc.,) for the citizens of NCTD. The GMPDW is based on Client-Server architecture model. It has been developed using Arc GIS Server 10.0 with .NET (pronounced dot net) technology. The GMPDW is scalable to enterprise SDSS with enterprise Geo Database & Virtual Private Network (VPN) connectivity. Spatial data to GMPDW includes Enumeration Block (EB) and Enumeration Blocks Group (EBG) boundaries of Citizens of Delhi, Assembly Constituency, Parliamentary Constituency, Election District, Landmark locations of Polling Stations & basic amenities (Police Stations, Hospitals, Schools and Fire Stations etc.). GMPDW could help achieve not only the desired transparency and easiness in planning process but also facilitates through efficient & effective tools for management of MCD election. It enables a faster response to the changing ground realities in the development planning, owing to its in-built scientific approach and open-ended design.
Knowledge-based IMRT treatment planning for prostate cancer.
Chanyavanich, Vorakarn; Das, Shiva K; Lee, William R; Lo, Joseph Y
2011-05-01
To demonstrate the feasibility of using a knowledge base of prior treatment plans to generate new prostate intensity modulated radiation therapy (IMRT) plans. Each new case would be matched against others in the knowledge base. Once the best match is identified, that clinically approved plan is used to generate the new plan. A database of 100 prostate IMRT treatment plans was assembled into an information-theoretic system. An algorithm based on mutual information was implemented to identify similar patient cases by matching 2D beam's eye view projections of contours. Ten randomly selected query cases were each matched with the most similar case from the database of prior clinically approved plans. Treatment parameters from the matched case were used to develop new treatment plans. A comparison of the differences in the dose-volume histograms between the new and the original treatment plans were analyzed. On average, the new knowledge-based plan is capable of achieving very comparable planning target volume coverage as the original plan, to within 2% as evaluated for D98, D95, and D1. Similarly, the dose to the rectum and dose to the bladder are also comparable to the original plan. For the rectum, the mean and standard deviation of the dose percentage differences for D20, D30, and D50 are 1.8% +/- 8.5%, -2.5% +/- 13.9%, and -13.9% +/- 23.6%, respectively. For the bladder, the mean and standard deviation of the dose percentage differences for D20, D30, and D50 are -5.9% +/- 10.8%, -12.2% +/- 14.6%, and -24.9% +/- 21.2%, respectively. A negative percentage difference indicates that the new plan has greater dose sparing as compared to the original plan. The authors demonstrate a knowledge-based approach of using prior clinically approved treatment plans to generate clinically acceptable treatment plans of high quality. This semiautomated approach has the potential to improve the efficiency of the treatment planning process while ensuring that high quality plans are developed.
Space Station Freedom Environmental Health Care Program
NASA Technical Reports Server (NTRS)
Richard, Elizabeth E.; Russo, Dane M.
1992-01-01
The paper discusses the environmental planning and monitoring aspects of the Space Station Freedom (SSF) Environmental Health Care Program, which encompasses all phases of the SSF assembly and operation from the first element entry at MB-6 through the Permanent Manned Capability and beyond. Environmental planning involves the definition of acceptability limits and monitoring requirements for the radiation dose barothermal parameters and potential contaminants in the SSF air and water and on internal surfaces. Inflight monitoring will be implemented through the Environmental Health System, which consists of five subsystems: Microbiology, Toxicology, Water Quality, Radiation, and Barothermal Physiology. In addition to the environmental data interpretation and analysis conducted after each mission, the new data will be compared to archived data for statistical and long-term trend analysis and determination of risk exposures. Results of these analyses will be used to modify the acceptability limits and monitoring requirements for the future.
International Agreement on Planetary Protection
NASA Technical Reports Server (NTRS)
2000-01-01
The maintenance of a NASA policy, is consistent with international agreements. The planetary protection policy management in OSS, with Field Center support. The advice from internal and external advisory groups (NRC, NAC/Planetary Protection Task Force). The technology research and standards development in bioload characterization. The technology research and development in bioload reduction/sterilization. This presentation focuses on: forward contamination - research on the potential for Earth life to exist on other bodies, improved strategies for planetary navigation and collision avoidance, and improved procedures for sterile spacecraft assembly, cleaning and/or sterilization; and backward contamination - development of sample transfer and container sealing technologies for Earth return, improvement in sample return landing target assessment and navigation strategy, planning for sample hazard determination requirements and procedures, safety certification, (liaison to NEO Program Office for compositional data on small bodies), facility planning for sample recovery system, quarantine, and long-term curation of 4 returned samples.
Achieving full connectivity of sites in the multiperiod reserve network design problem
Jafari, Nahid; Nuse, Bryan L.; Moore, Clinton; Dilkina, Bistra; Hepinstall-Cymerman, Jeffrey
2017-01-01
The conservation reserve design problem is a challenge to solve because of the spatial and temporal nature of the problem, uncertainties in the decision process, and the possibility of alternative conservation actions for any given land parcel. Conservation agencies tasked with reserve design may benefit from a dynamic decision system that provides tactical guidance for short-term decision opportunities while maintaining focus on a long-term objective of assembling the best set of protected areas possible. To plan cost-effective conservation over time under time-varying action costs and budget, we propose a multi-period mixed integer programming model for the budget-constrained selection of fully connected sites. The objective is to maximize a summed conservation value over all network parcels at the end of the planning horizon. The originality of this work is in achieving full spatial connectivity of the selected sites during the schedule of conservation actions.
Cracking the egg: virtual embryogenesis of real robots.
Cussat-Blanc, Sylvain; Pollack, Jordan
2014-01-01
All multicellular living beings are created from a single cell. A developmental process, called embryogenesis, takes this first fertilized cell down a complex path of reproduction, migration, and specialization into a complex organism adapted to its environment. In most cases, the first steps of the embryogenesis take place in a protected environment such as in an egg or in utero. Starting from this observation, we propose a new approach to the generation of real robots, strongly inspired by living systems. Our robots are composed of tens of specialized cells, grown from a single cell using a bio-inspired virtual developmental process. Virtual cells, controlled by gene regulatory networks, divide, migrate, and specialize to produce the robot's body plan (morphology), and then the robot is manually built from this plan. Because the robot is as easy to assemble as Lego, the building process could be easily automated.
Kilopower: Small and Affordable Fission Power Systems for Space
NASA Technical Reports Server (NTRS)
Mason, Lee; Palac, Don; Gibson, Marc
2017-01-01
The Nuclear Systems Kilopower Project was initiated by NASA's Space Technology Mission Directorate Game Changing Development Program in fiscal year 2015 to demonstrate subsystem-level technology readiness of small space fission power in a relevant environment (Technology Readiness Level 5) for space science and human exploration power needs. The Nuclear Systems Kilopower Project centerpiece is the Kilopower Reactor Using Stirling Technology (KRUSTY) test, which consists of the development and testing of a fission ground technology demonstrator of a 1 kWe-class fission power system. The technologies to be developed and validated by KRUSTY are extensible to space fission power systems from 1 to 10 kWe, which can enable higher power future potential deep space science missions, as well as modular surface fission power systems for exploration. The Kilopower Project is cofounded by NASA and the Department of Energy National Nuclear Security Administration (NNSA).KRUSTY include the reactor core, heat pipes to transfer the heat from the core to the power conversion system, and the power conversion system. Los Alamos National Laboratory leads the design of the reactor, and the Y-12 National Security Complex is fabricating it. NASA Glenn Research Center (GRC) has designed, built, and demonstrated the balance of plant heat transfer and power conversion portions of the KRUSTY experiment. NASA MSFC developed an electrical reactor simulator for non-nuclear testing, and the design of the reflector and shielding for nuclear testing. In 2016, an electrically heated non-fissionable Depleted Uranium (DU) core was tested at GRC in a configuration identical to the planned nuclear test. Once the reactor core has been fabricated and shipped to the Device Assembly Facility at the NNSAs Nevada National Security Site, the KRUSTY nuclear experiment will be assembled and tested. Completion of the KRUSTY experiment will validate the readiness of 1 to 10 kWe space fission technology for NASAs future requirements for sunlight-independent space power. An early opportunity for demonstration of In-Situ Resource Utilization (ISRU) capability on the surface of Mars is currently being considered for 2026 launch. Since a space fission system is the leading option for power generation for the first Mars human outpost, a smaller version of a planetary surface fission power system could be built to power the ISRU demonstration and ensure its end-to-end validity. Planning is underway to start the hardware development of this subscale flight demonstrator in 2018.
Physical principles for DNA tile self-assembly.
Evans, Constantine G; Winfree, Erik
2017-06-19
DNA tiles provide a promising technique for assembling structures with nanoscale resolution through self-assembly by basic interactions rather than top-down assembly of individual structures. Tile systems can be programmed to grow based on logical rules, allowing for a small number of tile types to assemble large, complex assemblies that can retain nanoscale resolution. Such algorithmic systems can even assemble different structures using the same tiles, based on inputs that seed the growth. While programming and theoretical analysis of tile self-assembly often makes use of abstract logical models of growth, experimentally implemented systems are governed by nanoscale physical processes that can lead to very different behavior, more accurately modeled by taking into account the thermodynamics and kinetics of tile attachment and detachment in solution. This review discusses the relationships between more abstract and more physically realistic tile assembly models. A central concern is how consideration of model differences enables the design of tile systems that robustly exhibit the desired abstract behavior in realistic physical models and in experimental implementations. Conversely, we identify situations where self-assembly in abstract models can not be well-approximated by physically realistic models, putting constraints on physical relevance of the abstract models. To facilitate the discussion, we introduce a unified model of tile self-assembly that clarifies the relationships between several well-studied models in the literature. Throughout, we highlight open questions regarding the physical principles for DNA tile self-assembly.
Photovoltaic system with improved AC connections and method of making same
Cioffi, Philip Michael; Todorovic, Maja Harfman; Herzog, Michael Scott; Korman, Charles Steven; Doherty, Donald M.; Johnson, Neil Anthony
2018-02-13
An alternating current (AC) harness for a photovoltaic (PV) system includes a wire assembly having a first end and a second end, the wire assembly having a plurality of lead wires, and at least one AC connection module positioned at a location along a length of the wire assembly between the first end and the second end. Further, the at least one AC connection module includes a first connection terminal electrically coupled to the plurality of lead wires of the wire assembly and constructed to electrically couple the wire assembly with an output of a first PV module of the PV system. The at least one AC connection module also includes a second connection terminal electrically coupled to the plurality of lead wires of the wire assembly and constructed to electrically couple the wire assembly with an output of a second PV module of the PV system.
NASA Technical Reports Server (NTRS)
Burcham, Michael S.; Daprato, Rebecca C.
2016-01-01
This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.
Board of Governors' Recommendations: FY 2007-09 Biennial Capital Budget and Five-Year Plans
ERIC Educational Resources Information Center
Connecticut Department of Higher Education (NJ1), 2006
2006-01-01
In accordance with the Connecticut General Statutes Sec. 10a-6 and 10a-8, the Board of Governors' prepares and presents to the Governor and General Assembly a consolidated capital budget request and five-year plan with recommendations for public higher education. Through passage of the UConn 2000 legislation, the University of Connecticut…
40 CFR 52.2470 - Identification of plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
.... (a) Purpose and scope. This section sets forth the applicable State implementation plan for the State... Quality Standards 1/3/89 1/15/93, 58 FR 4578 173-470-160 Reporting of Data 9/16/87 1/15/93, 58 FR 4578.../22/91 7/12/93, 58 FR 37426 173-490-208 Aerospace Assembly and Component Coating Operations 3/22/91 7...
AB 1725 Human Resources Development Plan for the Period July 1, 1989-June 30, 1990.
ERIC Educational Resources Information Center
Desert Community Coll. District, Palm Desert, CA.
Funds set aside by California Assembly Bill (AB) 1725 for staff development programs were used by the Desert Community College District (DCCD) to supplement its existing human resources development plan (HRDP). The HRDP, which was based on the results of a needs assessment of all employees, was designed to respond to the changing professional…
Synthesis and assembly of retrovirus Gag precursors into immature capsids in vitro.
Sakalian, M; Parker, S D; Weldon, R A; Hunter, E
1996-01-01
The assembly of retroviral particles is mediated by the product of the gag gene; no other retroviral gene products are necessary for this process. While most retroviruses assemble their capsids at the plasma membrane, viruses of the type D class preassemble immature capsids within the cytoplasm of infected cells. This has allowed us to determine whether immature capsids of the prototypical type D retrovirus, Mason-Pfizer monkey virus (M-PMV), can assemble in a cell-free protein synthesis system. We report here that assembly of M-PMV Gag precursor proteins can occur in this in vitro system. Synthesized particles sediment in isopycnic gradients to the appropriate density and in thin-section electron micrographs have a size and appearance consistent with those of immature retrovirus capsids. The in vitro system described in this report appears to faithfully mimic the process of assembly which occurs in the host cell cytoplasm, since M-PMV gag mutants defective in in vivo assembly also fail to assemble in vitro. Likewise, the Gag precursor proteins of retroviruses that undergo type C morphogenesis, Rous sarcoma virus and human immunodeficiency virus, which do not preassemble capsids in vivo, fail to assemble particles in this system. Additionally, we demonstrate, with the use of anti-Gag antibodies, that this cell-free system can be utilized for analysis in vitro of potential inhibitors of retrovirus assembly. PMID:8648705
Control assembly for controlling a fuel cell system during shutdown and restart
Venkataraman, Ramki; Berntsen, George; Carlson, Glenn L.; Farooque, Mohammad; Beachy, Dan; Peterhans, Stefan; Bischoff, Manfred
2010-06-15
A fuel cell system and method in which the fuel cell system receives and an input oxidant gas and an input fuel gas, and in which a fuel processing assembly is provided and is adapted to at least humidify the input fuel gas which is to be supplied to the anode of the fuel cell of the system whose cathode receives the oxidant input gas via an anode oxidizing assembly which is adapted to couple the output of the anode of the fuel cell to the inlet of the cathode of the fuel cell during normal operation, shutdown and restart of the fuel cell system, and in which a control assembly is further provided and is adapted to respond to shutdown of the fuel cell system during which input fuel gas and input oxidant gas cease to be received by the fuel cell system, the control assembly being further adapted to, when the fuel cell system is shut down: control the fuel cell system so as to enable a purging gas to be able to flow through the fuel processing assembly to remove humidified fuel gas from the processing assembly and to enable a purging gas to be able to flow through the anode of the fuel cell.
Ground operation of the mobile servicing system on Space Station Freedom
NASA Astrophysics Data System (ADS)
Wojcik, Z. A.
1992-11-01
Space Station Freedom (SSF) will be assembled in the 1995 to 2000 time period, when permanently manned capability (PMC) will be achieved. During the build phase and after PMC, the Mobile Servicing System (MSS) will be used as a tool to assist crew in the building and in assembly and all maintenance aspects of SSF. Operation of the MSS will be executed and controlled by on-orbit crew, thereby having an impact on the limited crew time and resources. The current plan specifies that the MSS will not be operable when crew are not present. Simulations have been carried out to quantify the maintenance workload expected over the life of SSF. These simulations predict a peak in maintenance demand occurring even before PMC is achieved. The MSS is key to executing those maintenance tasks, and as a result, the demands on MSS crew resource will likely exceed availability, thereby creating a backlog of maintenance actions and negatively impacting SSF effectiveness. Ground operated telerobotics (GOT), the operation of the MSS from the ground, is being proposed as an approach to reducing the anticipated maintenance backlog, along with reducing crew workload when the MSS is executing simple or repetitive tasks. GOT would be implemented in a phased approach, both in terms of the type of activity carried out and the point of control gradually passing from on-orbit crew to ground personnel. The benefits of GOT are expressed in terms of reduced on-orbit crew workload, greater availability of the MSS during the post-PMC period, and the ability to significantly reduce or even eliminate any maintenance action backlog. The benefits section compares GOT with crew operation timelines, and identifies other benefits of GOT. Critical factors such as safety, space-ground communication latency, simulation, operations planning, and design considerations are reviewed.
Evaluation plan for state gas heating system retrofit pilot programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berry, L.; Vineyard, T.
This report presents a detailed plan for the evaluation of state gas heating system retrofit pilot programs. The major goals of the evaluation procedures are to document the fuel savings and cost effectiveness of (1) the programs implemented by the states and (2) the four retrofit types installed. The major tasks involved in the evaluation include identification of program-eligible households, screening for data quality, assignment of eligible households to treatment or control groups, assembling cost data, collecting pre- and postretrofit consumption data, obtainin pre- and postretrofit weather data, checking for data quality, and analyzing the data. Data analysis relies onmore » the calculation of weather-adjusted normalized annual consumption (NAC) figures for pre- and postretrofit years for treatment and control groups. The differences between the treatment and control groups' NACs for the pre- and postretrofit years are the measure of the program's impact. Cost effectiveness analysis will combine the NAC results with cost data and with a variety of assumptions concerning future fuel prices, retrofit lifetimes, and discount rates to produce benefit/cost indicators.« less
Lost in Translation: the Case for Integrated Testing
NASA Technical Reports Server (NTRS)
Young, Aaron
2017-01-01
The building of a spacecraft is complex and often involves multiple suppliers and companies that have their own designs and processes. Standards have been developed across the industries to reduce the chances for critical flight errors at the system level, but the spacecraft is still vulnerable to the introduction of critical errors during integration of these systems. Critical errors can occur at any time during the process and in many cases, human reliability analysis (HRA) identifies human error as a risk driver. Most programs have a test plan in place that is intended to catch these errors, but it is not uncommon for schedule and cost stress to result in less testing than initially planned. Therefore, integrated testing, or "testing as you fly," is essential as a final check on the design and assembly to catch any errors prior to the mission. This presentation will outline the unique benefits of integrated testing by catching critical flight errors that can otherwise go undetected, discuss HRA methods that are used to identify opportunities for human error, lessons learned and challenges over ownership of testing will be discussed.
Macroinvertebrate community assembly in pools created during peatland restoration.
Brown, Lee E; Ramchunder, Sorain J; Beadle, Jeannie M; Holden, Joseph
2016-11-01
Many degraded ecosystems are subject to restoration attempts, providing new opportunities to unravel the processes of ecological community assembly. Restoration of previously drained northern peatlands, primarily to promote peat and carbon accumulation, has created hundreds of thousands of new open water pools. We assessed the potential benefits of this wetland restoration for aquatic biodiversity, and how communities reassemble, by comparing pool ecosystems in regions of the UK Pennines on intact (never drained) versus restored (blocked drainage-ditches) peatland. We also evaluated the conceptual idea that comparing reference ecosystems in terms of their compositional similarity to null assemblages (and thus the relative importance of stochastic versus deterministic assembly) can guide evaluations of restoration success better than analyses of community composition or diversity. Community composition data highlighted some differences in the macroinvertebrate composition of restored pools compared to undisturbed peatland pools, which could be used to suggest that alternative end-points to restoration were influenced by stochastic processes. However, widely used diversity metrics indicated no differences between undisturbed and restored pools. Novel evaluations of restoration using null models confirmed the similarity of deterministic assembly processes from the national species pool across all pools. Stochastic elements were important drivers of between-pool differences at the regional-scale but the scale of these effects was also similar across most of the pools studied. The amalgamation of assembly theory into ecosystem restoration monitoring allows us to conclude with more certainty that restoration has been successful from an ecological perspective in these systems. Evaluation of these UK findings compared to those from peatlands across Europe and North America further suggests that restoring peatland pools delivers significant benefits for aquatic fauna by providing extensive new habitat that is largely equivalent to natural pools. More generally, we suggest that assembly theory could provide new benchmarks for planning and evaluating ecological restoration success. Copyright © 2016 The Authors. Published by Elsevier B.V. All rights reserved.
A Modular Orbital Demonstration of an Evolvable Space Telescope (MODEST)
NASA Astrophysics Data System (ADS)
Conti, Alberto; Arenberg, Jonathan; Baldauf, Brian
2017-01-01
The “Search for Life” (direct imaging of earth-like planets) will require extremely stable telescopes with apertures in the 10 m to 20 m range. Such apertures are larger than what can be delivered to space using current or planned future launch vehicles. Building and assembling large telescopes in space is therefore likely to require not only multiple launches but importantly assembly in spce. As a result, space-based telescopes with large apertures will require major changes to our conventional telescope design and architecture.Here we report on the concept for the Modular Orbital Demonstration of an Evolvable Space Telescope (MODEST) to demonstrates the on-orbit robotic and/or astronaut assembly of an optical telescope in space. MODEST is a proposed International Space Station (ISS demonstration that will make use of the standard Express Logistics Carriers (ELCs) and can mounted to one of a variety of ISS pallets.MODEST will provides significant risk reduction for the next generation of space observatories, and demonstrates the technology needed to assemble a six-mirror phased telescope. Key modest features include the use of an active primary optical surface with wavefront feedback control to allow on-orbit optimization, and the precise surface control to meet optical system wavefront and stability requirements.MODEST will also be used to evaluate advances in lightweight mirror and metering structure materials such as SiC or Carbon Fiber Reinforced Polymer (CFRP) that have excellent mechanical and thermal properties, e.g. high stiffness, high modulus, high thermal conductivity, and low thermal expansion. Mirrors built from these materials can be rapidly replicated in a highly cost effective manner, making them an excellent candidate for a low cost, high performance Optical Telescope Assembly paving the way for enabling affordable solutions for the next generation of large aperture space-based telescope.MODEST post-assembly value includes space, ground, and environmental studies, a testbed for new instruments, and a tool for student’s exploration of space.
Robot vision system programmed in Prolog
NASA Astrophysics Data System (ADS)
Batchelor, Bruce G.; Hack, Ralf
1995-10-01
This is the latest in a series of publications which develop the theme of programming a machine vision system using the artificial intelligence language Prolog. The article states the long-term objective of the research program of which this work forms part. Many but not yet all of the goals laid out in this plan have already been achieved in an integrated system, which uses a multi-layer control hierarchy. The purpose of the present paper is to demonstrate that a system based upon a Prolog controller is capable of making complex decisions and operating a standard robot. The authors chose, as a vehicle for this exercise, the task of playing dominoes against a human opponent. This game was selected for this demonstration since it models a range of industrial assembly tasks, where parts are to be mated together. (For example, a 'daisy chain' of electronic equipment and the interconnecting cables/adapters may be likened to a chain of dominoes.)
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
Quadrant moved ducts and high efficiency furnace inside conditioned space on nearly all 300 customizable house plans. The builder uses dry, true factory-assembled walls, extensive air sealing, and just in time delivery for pre-sold homes.
"Chemical transformers" from nanoparticle ensembles operated with logic.
Motornov, Mikhail; Zhou, Jian; Pita, Marcos; Gopishetty, Venkateshwarlu; Tokarev, Ihor; Katz, Evgeny; Minko, Sergiy
2008-09-01
The pH-responsive nanoparticles were coupled with information-processing enzyme-based systems to yield "smart" signal-responsive hybrid systems with built-in Boolean logic. The enzyme systems performed AND/OR logic operations, transducing biochemical input signals into reversible structural changes (signal-directed self-assembly) of the nanoparticle assemblies, thus resulting in the processing and amplification of the biochemical signals. The hybrid system mimics biological systems in effective processing of complex biochemical information, resulting in reversible changes of the self-assembled structures of the nanoparticles. The bioinspired approach to the nanostructured morphing materials could be used in future self-assembled molecular robotic systems.
NASA Astrophysics Data System (ADS)
Nathan Harris, E.; Morgenthaler, George W.
2004-07-01
Beginning in 1995, a team of 3-D engineering visualization experts assembled at the Lockheed Martin Space Systems Company and began to develop innovative virtual prototyping simulation tools for performing ground processing and real-time visualization of design and planning of aerospace missions. At the University of Colorado, a team of 3-D visualization experts also began developing the science of 3-D visualization and immersive visualization at the newly founded British Petroleum (BP) Center for visualization, which began operations in October, 2001. BP acquired ARCO in the year 2000 and awarded the 3-D flexible IVE developed by ARCO (beginning in 1990) to the University of Colorado, CU, the winner in a competition among 6 Universities. CU then hired Dr. G. Dorn, the leader of the ARCO team as Center Director, and the other experts to apply 3-D immersive visualization to aerospace and to other University Research fields, while continuing research on surface interpretation of seismic data and 3-D volumes. This paper recounts further progress and outlines plans in Aerospace applications at Lockheed Martin and CU.
Development status of the PDC-1 Parabolic Dish Concentrator
NASA Technical Reports Server (NTRS)
Thostesen, T.; Soczak, I. F.; Pons, R. L.
1982-01-01
The status of development of the 12 m diameter parabolic dish concentrator which is planned for use with the Small Community Solar Thermal Power System. The PDC-1 unit features the use of plastic reflector film bonded to structural plastic gores supported by front-bracing steel ribs. An elevation-over-azimuth mount arrangement is employed, with a conventional wheel-and-track arrangement; outboard trunnions permit the dish to be stored in the face down position, with the added advantage of easy access to the power conversion assembly. The control system is comprised of a central computer (LSI 1123), a manual control panel, a concentrator control unit, two motor controllers, a Sun sensor, and two angular position resolvers. The system is designed for the simultaneous control of several concentrators. The optical testing of reflective panels is described.
CARMENES: an overview six months after first light
NASA Astrophysics Data System (ADS)
Quirrenbach, A.; Amado, P. J.; Caballero, J. A.; Mundt, R.; Reiners, A.; Ribas, I.; Seifert, W.; Abril, M.; Aceituno, J.; Alonso-Floriano, F. J.; Anwand-Heerwart, H.; Azzaro, M.; Bauer, F.; Barrado, D.; Becerril, S.; Bejar, V. J. S.; Benitez, D.; Berdinas, Z. M.; Brinkmöller, M.; Cardenas, M. C.; Casal, E.; Claret, A.; Colomé, J.; Cortes-Contreras, M.; Czesla, S.; Doellinger, M.; Dreizler, S.; Feiz, C.; Fernandez, M.; Ferro, I. M.; Fuhrmeister, B.; Galadi, D.; Gallardo, I.; Gálvez-Ortiz, M. C.; Garcia-Piquer, A.; Garrido, R.; Gesa, L.; Gómez Galera, V.; González Hernández, J. I.; Gonzalez Peinado, R.; Grözinger, U.; Guàrdia, J.; Guenther, E. W.; de Guindos, E.; Hagen, H.-J.; Hatzes, A. P.; Hauschildt, P. H.; Helmling, J.; Henning, T.; Hermann, D.; Hernández Arabi, R.; Hernández Castaño, L.; Hernández Hernando, F.; Herrero, E.; Huber, A.; Huber, K. F.; Huke, P.; Jeffers, S. V.; de Juan, E.; Kaminski, A.; Kehr, M.; Kim, M.; Klein, R.; Klüter, J.; Kürster, M.; Lafarga, M.; Lara, L. M.; Lamert, A.; Laun, W.; Launhardt, R.; Lemke, U.; Lenzen, R.; Llamas, M.; Lopez del Fresno, M.; López-Puertas, M.; López-Santiago, J.; Lopez Salas, J. F.; Magan Madinabeitia, H.; Mall, U.; Mandel, H.; Mancini, L.; Marin Molina, J. A.; Maroto Fernández, D.; Martín, E. L.; Martín-Ruiz, S.; Marvin, C.; Mathar, R. J.; Mirabet, E.; Montes, D.; Morales, J. C.; Morales Muñoz, R.; Nagel, E.; Naranjo, V.; Nowak, G.; Palle, E.; Panduro, J.; Passegger, V. M.; Pavlov, A.; Pedraz, S.; Perez, E.; Pérez-Medialdea, D.; Perger, M.; Pluto, M.; Ramón, A.; Rebolo, R.; Redondo, P.; Reffert, S.; Reinhart, S.; Rhode, P.; Rix, H.-W.; Rodler, F.; Rodríguez, E.; Rodríguez López, C.; Rohloff, R. R.; Rosich, A.; Sanchez Carrasco, M. A.; Sanz-Forcada, J.; Sarkis, P.; Sarmiento, L. F.; Schäfer, S.; Schiller, J.; Schmidt, C.; Schmitt, J. H. M. M.; Schöfer, P.; Schweitzer, A.; Shulyak, D.; Solano, E.; Stahl, O.; Storz, C.; Tabernero, H. M.; Tala, M.; Tal-Or, L.; Ulbrich, R.-G.; Veredas, G.; Vico Linares, J. I.; Vilardell, F.; Wagner, K.; Winkler, J.; Zapatero Osorio, M.-R.; Zechmeister, M.; Ammler-von Eiff, M.; Anglada-Escudé, G.; del Burgo, C.; Garcia-Vargas, M. L.; Klutsch, A.; Lizon, J.-L.; Lopez-Morales, M.; Ofir, A.; Pérez-Calpena, A.; Perryman, M. A. C.; Sánchez-Blanco, E.; Strachan, J. B. P.; Stürmer, J.; Suárez, J. C.; Trifonov, T.; Tulloch, S. M.; Xu, W.
2016-08-01
The CARMENES instrument is a pair of high-resolution (R> 80,000) spectrographs covering the wavelength range from 0.52 to 1.71 μm, optimized for precise radial velocity measurements. It was installed and commissioned at the 3.5m telescope of the Calar Alto observatory in Southern Spain in 2015. The first large science program of CARMENES is a survey of 300 M dwarfs, which started on Jan 1, 2016. We present an overview of all subsystems of CARMENES (front end, fiber system, visible-light spectrograph, near-infrared spectrograph, calibration units, etalons, facility control, interlock system, instrument control system, data reduction pipeline, data flow, and archive), and give an overview of the assembly, integration, verification, and commissioning phases of the project. We show initial results and discuss further plans for the scientific use of CARMENES.
NASA Technical Reports Server (NTRS)
By, Andre Bernard; Caron, Ken; Rothenberg, Michael; Sales, Vic
1994-01-01
This paper presents the first phase results of a collaborative effort between university researchers and a flexible assembly systems integrator to implement a comprehensive modular approach to flexible assembly automation. This approach, named MARAS (Modular Automated Reconfigurable Assembly System), has been structured to support multiple levels of modularity in terms of both physical components and system control functions. The initial focus of the MARAS development has been on parts gauging and feeding operations for cylinder lock assembly. This phase is nearing completion and has resulted in the development of a highly configurable system for vision gauging functions on a wide range of small components (2 mm to 100 mm in size). The reconfigurable concepts implemented in this adaptive Vision Gauging Module (VGM) are now being extended to applicable aspects of the singulating, selecting, and orienting functions required for the flexible feeding of similar mechanical components and assemblies.
Evolving Systems: Adaptive Key Component Control and Inheritance of Passivity and Dissipativity
NASA Technical Reports Server (NTRS)
Frost, S. A.; Balas, M. J.
2010-01-01
We propose a new framework called Evolving Systems to describe the self-assembly, or autonomous assembly, of actively controlled dynamical subsystems into an Evolved System with a higher purpose. Autonomous assembly of large, complex flexible structures in space is a target application for Evolving Systems. A critical requirement for autonomous assembling structures is that they remain stable during and after assembly. The fundamental topic of inheritance of stability, dissipativity, and passivity in Evolving Systems is the primary focus of this research. In this paper, we develop an adaptive key component controller to restore stability in Nonlinear Evolving Systems that would otherwise fail to inherit the stability traits of their components. We provide sufficient conditions for the use of this novel control method and demonstrate its use on an illustrative example.
Fuel injection assembly for use in turbine engines and method of assembling same
Uhm, Jong Ho; Johnson, Thomas Edward
2015-03-24
A fuel injection assembly for use in a turbine engine is provided. The fuel injection assembly includes a plurality of tube assemblies, wherein each of the tube assemblies includes an upstream portion and a downstream portion. Each tube assembly includes a plurality of tubes that extend from the upstream portion to the downstream portion or from the upstream portion through the downstream portion. At least one injection system is coupled to at least one tube assembly of the plurality of tube assemblies. The injection system includes a fluid supply member that extends from a fluid source to the downstream portion of the tube assembly. The fluid supply member includes a first end portion located in the downstream portion of the tube assembly, wherein the first end portion has at least one first opening for channeling fluid through the tube assembly to facilitate reducing a temperature therein.
ERIC Educational Resources Information Center
Prince George's Community Coll., Largo, MD. Board of Trustees.
Each year, the Board of Trustees of Prince George's Community College (PGCC), in Maryland, must submit a report evaluating the effectiveness of PGCC's financial plan to the state's Higher Education Committee and General Assembly. This document provides the report for fiscal year (FY) 1996 divided into four sections. The first section reviews the…
ERIC Educational Resources Information Center
Prince George's Community Coll., Largo, MD. Board of Trustees.
Each year, the Board of Trustees of Prince George's Community College (PGCC) in Largo, Maryland, must submit a report evaluating the effectiveness of PGCC's financial plan to the state's Higher Education Committee and General Assembly. This document provides the report for fiscal year (FY) 1994 divided into four sections. The first section reviews…
ERIC Educational Resources Information Center
Prince George's Community Coll., Largo, MD. Board of Trustees.
Each year, the Board of Trustees of Prince George's Community College (PGCC) in Largo, Maryland, must submit a report evaluating the effectiveness of PGCC's financial plan to the state's Higher Education Committee and General Assembly. This report, for fiscal year (FY) 1993, is divided into four sections. The first section reviews the cost…
NASA Astrophysics Data System (ADS)
Ren, Yilong; Duan, Xitong; Wu, Lei; He, Jin; Xu, Wu
2017-06-01
With the development of the “VR+” era, the traditional virtual assembly system of power equipment has been unable to satisfy our growing needs. In this paper, based on the analysis of the traditional virtual assembly system of electric power equipment and the application of VR technology in the virtual assembly system of electric power equipment in our country, this paper puts forward the scheme of establishing the virtual assembly system of power equipment: At first, we should obtain the information of power equipment, then we should using OpenGL and multi texture technology to build 3D solid graphics library. After the completion of three-dimensional modeling, we can use the dynamic link library DLL package three-dimensional solid graphics generation program to realize the modularization of power equipment model library and power equipment model library generated hidden algorithm. After the establishment of 3D power equipment model database, we set up the virtual assembly system of 3D power equipment to separate the assembly operation of the power equipment from the space. At the same time, aiming at the deficiency of the traditional gesture recognition algorithm, we propose a gesture recognition algorithm based on improved PSO algorithm for BP neural network data glove. Finally, the virtual assembly system of power equipment can really achieve multi-channel interaction function.
Multi-Robot Assembly Strategies and Metrics.
Marvel, Jeremy A; Bostelman, Roger; Falco, Joe
2018-02-01
We present a survey of multi-robot assembly applications and methods and describe trends and general insights into the multi-robot assembly problem for industrial applications. We focus on fixtureless assembly strategies featuring two or more robotic systems. Such robotic systems include industrial robot arms, dexterous robotic hands, and autonomous mobile platforms, such as automated guided vehicles. In this survey, we identify the types of assemblies that are enabled by utilizing multiple robots, the algorithms that synchronize the motions of the robots to complete the assembly operations, and the metrics used to assess the quality and performance of the assemblies.
Multi-Robot Assembly Strategies and Metrics
MARVEL, JEREMY A.; BOSTELMAN, ROGER; FALCO, JOE
2018-01-01
We present a survey of multi-robot assembly applications and methods and describe trends and general insights into the multi-robot assembly problem for industrial applications. We focus on fixtureless assembly strategies featuring two or more robotic systems. Such robotic systems include industrial robot arms, dexterous robotic hands, and autonomous mobile platforms, such as automated guided vehicles. In this survey, we identify the types of assemblies that are enabled by utilizing multiple robots, the algorithms that synchronize the motions of the robots to complete the assembly operations, and the metrics used to assess the quality and performance of the assemblies. PMID:29497234
Assembly flow simulation of a radar
NASA Technical Reports Server (NTRS)
Rutherford, W. C.; Biggs, P. M.
1994-01-01
A discrete event simulation model has been developed to predict the assembly flow time of a new radar product. The simulation was the key tool employed to identify flow constraints. The radar, production facility, and equipment complement were designed, arranged, and selected to provide the most manufacturable assembly possible. A goal was to reduce the assembly and testing cycle time from twenty-six weeks. A computer software simulation package (SLAM 2) was utilized as the foundation for simulating the assembly flow time. FORTRAN subroutines were incorporated into the software to deal with unique flow circumstances that were not accommodated by the software. Detailed information relating to the assembly operations was provided by a team selected from the engineering, manufacturing management, inspection, and production assembly staff. The simulation verified that it would be possible to achieve the cycle time goal of six weeks. Equipment and manpower constraints were identified during the simulation process and adjusted as required to achieve the flow with a given monthly production requirement. The simulation is being maintained as a planning tool to be used to identify constraints in the event that monthly output is increased. 'What-if' studies have been conducted to identify the cost of reducing constraints caused by increases in output requirement.
Materials Challenges in Space Exploration
NASA Technical Reports Server (NTRS)
Bhat, Biliyar N.
2005-01-01
United States civil space program administered by National Aeronautics and Space Administration has a new strategic direction to explore the solar system. This new 'vision for space exploration' encompasses a broad range of human and robotic missions, including the Moon. Mars and destinations beyond. These missions require advanced systems and capabilities that will accelerate the development of many critical technologies, including advanced materials and structural concepts. Specifically, it is planned to develop high-performance materials for vehicle structures, propulsion systems, and space suits; structural concepts for modular assembly for space infrastructure: lightweight deployable and inflatable structures for large space systems and crew habitats; and highly integrated structural systems and advanced thermal management systems for reducing launch mass and volume. This paper will present several materials challenges in advanced space systems-high performance structural and thermal materials, space durable materials, radiation protection materials, and nano-structural materials. Finally, the paper will take a look at the possibility of utilizing materials in situ, i.e., processing materials on the surface of the Moon and Mars.
Biocatalytic Self-Assembly on Magnetic Nanoparticles.
Conte, Maria P; Sahoo, Jugal Kishore; Abul-Haija, Yousef M; Lau, K H Aaron; Ulijn, Rein V
2018-01-24
Combining (bio)catalysis and molecular self-assembly provides an effective approach for the production and processing of self-assembled materials by exploiting catalysis to direct the assembly kinetics and hence controlling the formation of ordered nanostructures. Applications of (bio)catalytic self-assembly in biologically interfacing systems and in nanofabrication have recently been reported. Inspired by self-assembly in biological cells, efforts to confine catalysts on flat or patterned surfaces to exert spatial control over molecular gelator generation and nanostructure self-assembly have also emerged. Building on our previous work in the area, we demonstrate in this report the use of enzymes immobilized onto magnetic nanoparticles (NPs) to spatially localize the initiation of peptide self-assembly into nanofibers around NPs. The concept is generalized for both an equilibrium biocatalytic system that forms stable hydrogels and a nonequilibrium system that normally has a preset lifetime. Characterization of the hydrogels shows that self-assembly occurs at the site of enzyme immobilization on the NPs to give rise to gels with a "hub-and-spoke" morphology, where the nanofibers are linked through the enzyme-NP conjugates. This NP-controlled arrangement of self-assembled nanofibers enables both remarkable enhancements in the shear strength of hydrogel systems and a dramatic extension of the hydrogel stability in the nonequilibrium system. We are also able to show that the use of magnetic NPs enables the external control of both the formation of the hydrogel and its overall structure by application of an external magnetic field. We anticipate that the enhanced properties and stimuli-responsiveness of our NP-enzyme system will have applications ranging from nanomaterial fabrication to biomaterials and biosensing.
Fluidic self-actuating control assembly
Grantz, Alan L.
1979-01-01
A fluidic self-actuating control assembly for use in a reactor wherein no external control inputs are required to actuate (scram) the system. The assembly is constructed to scram upon sensing either a sudden depressurization of reactor inlet flow or a sudden increase in core neutron flux. A fluidic control system senses abnormal flow or neutron flux transients and actuates the system, whereupon assembly coolant flow reverses, forcing absorber balls into the reactor core region.
75 FR 4265 - Airworthiness Directives; Lifesavings Systems Corp., D-Lok Hook Assembly
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-27
... Airworthiness Directives; Lifesavings Systems Corp., D-Lok Hook Assembly AGENCY: Federal Aviation Administration... adopting a new airworthiness directive (AD) for the Lifesavings Systems Corp., D-Lok Hook assembly... reported surface irregularities and discontinuities on certain D-Lok Hooks because of an unapproved change...
Combustion pinhole-camera system
Witte, A.B.
1982-05-19
A pinhole camera system is described utilizing a sealed optical-purge assembly which provides optical access into a coal combustor or other energy conversion reactors. The camera system basically consists of a focused-purge pinhole optical port assembly, a conventional TV vidicon receiver, an external, variable density light filter which is coupled electronically to the vidicon automatic gain control (agc). The key component of this system is the focused-purge pinhole optical port assembly which utilizes a purging inert gas to keep debris from entering the port and a lens arrangement which transfers the pinhole to the outside of the port assembly. One additional feature of the port assembly is that it is not flush with the interior of the combustor.
Combustion pinhole camera system
Witte, A.B.
1984-02-21
A pinhole camera system is described utilizing a sealed optical-purge assembly which provides optical access into a coal combustor or other energy conversion reactors. The camera system basically consists of a focused-purge pinhole optical port assembly, a conventional TV vidicon receiver, an external, variable density light filter which is coupled electronically to the vidicon automatic gain control (agc). The key component of this system is the focused-purge pinhole optical port assembly which utilizes a purging inert gas to keep debris from entering the port and a lens arrangement which transfers the pinhole to the outside of the port assembly. One additional feature of the port assembly is that it is not flush with the interior of the combustor. 2 figs.
Combustion pinhole camera system
Witte, Arvel B.
1984-02-21
A pinhole camera system utilizing a sealed optical-purge assembly which provides optical access into a coal combustor or other energy conversion reactors. The camera system basically consists of a focused-purge pinhole optical port assembly, a conventional TV vidicon receiver, an external, variable density light filter which is coupled electronically to the vidicon automatic gain control (agc). The key component of this system is the focused-purge pinhole optical port assembly which utilizes a purging inert gas to keep debris from entering the port and a lens arrangement which transfers the pinhole to the outside of the port assembly. One additional feature of the port assembly is that it is not flush with the interior of the combustor.
BioPartsBuilder: a synthetic biology tool for combinatorial assembly of biological parts.
Yang, Kun; Stracquadanio, Giovanni; Luo, Jingchuan; Boeke, Jef D; Bader, Joel S
2016-03-15
Combinatorial assembly of DNA elements is an efficient method for building large-scale synthetic pathways from standardized, reusable components. These methods are particularly useful because they enable assembly of multiple DNA fragments in one reaction, at the cost of requiring that each fragment satisfies design constraints. We developed BioPartsBuilder as a biologist-friendly web tool to design biological parts that are compatible with DNA combinatorial assembly methods, such as Golden Gate and related methods. It retrieves biological sequences, enforces compliance with assembly design standards and provides a fabrication plan for each fragment. BioPartsBuilder is accessible at http://public.biopartsbuilder.org and an Amazon Web Services image is available from the AWS Market Place (AMI ID: ami-508acf38). Source code is released under the MIT license, and available for download at https://github.com/baderzone/biopartsbuilder joel.bader@jhu.edu Supplementary data are available at Bioinformatics online. © The Author 2015. Published by Oxford University Press.
To Design or Not to Design: In Conclusion
2011-05-09
planning performing bricolage and assembling components of Design into detailed planning logic, the military might consider reversing this process and...while incorporated into Design‟s holistic worldview. The process of bricolage would subsequently reverse, and those relevant components of detailed...production, defined as “ bricolage ” in organizational theory circles, turns one into „a handyperson who, rather than inventing a new theory or a new
NASA Technical Reports Server (NTRS)
Jenett, Benjamin; Cellucci, Daniel; Cheung, Kenneth
2015-01-01
Automatic deployment of structures has been a focus of much academic and industrial work on infrastructure applications and robotics in general. This paper presents a robotic truss assembler designed for space applications - the Space Robot Universal Truss System (SpRoUTS) - that reversibly assembles a truss from a feedstock of hinged andflat-packed components, by folding the sides of each component up and locking onto the assembled structure. We describe the design and implementation of the robot and show that the assembled truss compares favorably with prior truss deployment systems.
A Gimbal sizing analysis for an IPACS rotating assembly
NASA Technical Reports Server (NTRS)
Burke, P. R.; Coronato, P. A.
1985-01-01
All major components of an integrated power/attitude control system (IPACS) assembly were analyzed for testing, launch, and operational stresses. The conceptual design for the outer gimbal and mounting ring structures were developed and analyzed along with preliminary designs of the pivot and torquer assemblies. Results from the system response analysis and the thermal analysis are also presented. Gimballing of this rotating assembly should present few difficulties as the maximum gimballing rate is quite low. However, the inner gimbal assembly in its current configuration must be modified to develop the system from a laboratory concept to a realistic flight hardware status.
Next-Generation MKIII Lightweight HUT/Hatch Assembly
NASA Technical Reports Server (NTRS)
McCarthy, Mike; Toscano, Ralph
2013-01-01
The MK III (H-1) carbon-graphite/ epoxy Hard Upper Torso (HUT)/Hatch assembly was designed, fabricated, and tested in the early 1990s. The spacesuit represented an 8.3 psi (˜58 kPa) technology demonstrator model of a zero prebreathe suit. The basic torso shell, brief, and hip areas of the suit were composed of a carbon-graphite/epoxy composite lay-up. In its current configuration, the suit weighs approximately 120 lb (˜54 kg). However, since future planetary suits will be designed to operate at 0.26 bar (˜26 kPa), it was felt that the suit's re-designed weight could be reduced to 79 lb (˜35 kg) with the incorporation of lightweight structural materials. Many robust, lightweight structures based on the technologies of advanced honeycomb materials, revolutionary new composite laminates, metal matrix composites, and recent breakthroughs in fullerene fillers and nanotechnology lend themselves well to applications requiring materials that are both light and strong. The major problem involves the reduction in weight of the HUT/ Hatch assembly for use in lunar and/or planetary applications, while at the same time maintaining a robust structural design. The technical objective is to research, design, and develop manufacturing methods that support fa b rica - tion of a lightweight HUT/Hatch assembly using advanced material and geometric redesign as necessary. Additionally, the lightweight HUT/Hatch assembly will interface directly with current MK III hardware. Using the new operating pressure and current MK III (H-1) interfaces as a starting block, it is planned to maximize HUT/Hatch assembly weight reduction through material selection and geometric redesign. A hard upper torso shell structure with rear-entry closure and corresponding hatch will be fabricated. The lightweight HUT/Hatch assembly will retrofit and interface with existing MK III (H-1) hardware elements, providing NASA with immediate "plug-andplay" capability. NASA crewmembers will have a lightweight, robust, life-support system that will minimize fatigue during extraterrestrial surface sojourns. Its unique feature is the utilization of a new and innovative family of materials used by the aerospace industry, which at the time of this reporting has not been used for the proposed application.
NASA Astrophysics Data System (ADS)
Faghihi, F.; Khalili, S.
2013-08-01
This article involves two aims for BNCT. First case includes a beam shaping assembly estimation for a D-T neutron source to find epi-thermal neutrons which are the goal in the BNCT. Second issue is the percent depth dose calculation in the adult Snyder head phantom. Monte-Carlo simulations and verification of a suggested beam shaping assembly (including internal neutron multiplier, moderator, filter, external neutron multiplier, collimator, and reflector dimensions) for thermalizing a D-T neutron source as well as increasing neutron flux are carried out and our results are given herein. Finally, we have simulated its corresponding doses for treatment planning of a deeply-seated tumor.
NASA Astrophysics Data System (ADS)
Oesterle, Jonathan; Lionel, Amodeo
2018-06-01
The current competitive situation increases the importance of realistically estimating product costs during the early phases of product and assembly line planning projects. In this article, several multi-objective algorithms using difference dominance rules are proposed to solve the problem associated with the selection of the most effective combination of product and assembly lines. The list of developed algorithms includes variants of ant colony algorithms, evolutionary algorithms and imperialist competitive algorithms. The performance of each algorithm and dominance rule is analysed by five multi-objective quality indicators and fifty problem instances. The algorithms and dominance rules are ranked using a non-parametric statistical test.
System and method for incremental forming
Beltran, Michael; Cao, Jian; Roth, John T.
2015-12-29
A system includes a frame configured to hold a workpiece and first and second tool positioning assemblies configured to be opposed to each other on opposite sides of the workpiece. The first and second tool positioning assemblies each include a toolholder configured to secure a tool to the tool positioning assembly, a first axis assembly, a second axis assembly, and a third axis assembly. The first, second, and third axis assemblies are each configured to articulate the toolholder along a respective axis. Each axis assembly includes first and second guides extending generally parallel to the corresponding axis and disposed on opposing sides of the toolholder with respect to the corresponding axis. Each axis assembly includes first and second carriages articulable along the first and second guides of the axis assembly, respectively, in the direction of the corresponding axis.
NASA Technical Reports Server (NTRS)
Lewis, James L. (Inventor); Carroll, Monty B. (Inventor); Le, Thang D. (Inventor); Morales, Ray H. (Inventor); Robertson, Brandan R. (Inventor)
2009-01-01
An androgynous mating system for mating two exoatmospheric space modules comprising a first mating assembly capable of mating with a second mating assembly; a second mating assembly structurally identical to said first mating assembly, said first mating assembly comprising; a load ring; a plurality of load cell subassemblies; a plurality of actuators; a base ring; a tunnel; a closed loop control system; one or more electromagnets; and one or more striker plates, wherein said one or more electomagnets on said second mating assembly are capable of mating with said one or more striker plates on said first mating assembly, and wherein said one or more striker plates is comprised of a plate of predetermined shape and a 5-DOF mechanism capable of maintaining predetermined contact requirements during said mating of said one or more electromagnets and said one or more striker plates.
Virtualization for Cost-Effective Teaching of Assembly Language Programming
ERIC Educational Resources Information Center
Cadenas, José O.; Sherratt, R. Simon; Howlett, Des; Guy, Chris G.; Lundqvist, Karsten O.
2015-01-01
This paper describes a virtual system that emulates an ARM-based processor machine, created to replace a traditional hardware-based system for teaching assembly language. The virtual system proposed here integrates, in a single environment, all the development tools necessary to deliver introductory or advanced courses on modern assembly language…