Gharedaghi, Gholamreza; Omidvari, Manouchehr
2018-01-11
Contractor selection is one of the major concerns of industry managers such as those in the oil industry. The objective of this study was to determine a contractor selection pattern for oil and gas industries in a safety approach. Assessment of contractors based on specific criteria and ultimately selecting an eligible contractor preserves the organizational resources. Due to the safety risks involved in the oil industry, one of the major criteria of contractor selection considered by managers today is safety. The results indicated that the most important safety criterion of contractor selection was safety records and safety investments. This represented the industry's risks and the impact of safety training and investment on the performance of other sectors and the overall organization. The output of this model could be useful in the safety risk assessment process in the oil industry and other industries.
NASA Astrophysics Data System (ADS)
Kozlovská, Mária; Struková, Zuzana
2013-06-01
Several factors should be considered by the owner and general contractor in the process of contractors` and subcontractors` selection and evaluation. The paper reviews the recent models addressed to guide general contractors in subcontractors' selection process and in evaluation of different contractors during the execution of the project. Moreover the paper suggests the impact of different contractors' performance to the overall level of occupational health and safety culture at the sites. It deals with the factors influencing the safety performance of contractors during construction and analyses the methods for assessing the safety performance of construction contractors. The results of contractors' safety performance evaluation could be a useful tool in motivating contractors to achieve better safety outcomes or could have effect on owners` or general contractors' decision making about contractors suitability for future contracting works.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-16
... Mobile Fueling Operations, Nationwide AGENCY: Postal Service. ACTION: Notice of intent to prepare a...) for the use of mobile fueling contractors to fuel postal vehicles on-site at selected Postal Service... utilize mobile fueling contractors to fuel vehicles on site at selected postal facilities located...
The selection of construction sub-contractors using the fuzzy sets theory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krzemiński, Michał
The paper presents the algorithm for the selection of sub-contractors. Main area of author’s interest is scheduling flow models. The ranking task aims at execution time as short as possible Brigades downtime should also be as small as possible. These targets are exposed to significant obsolescence. The criteria for selection of subcontractors will not be therefore time and cost, it is assumed that all those criteria be meet by sub-contractors. The decision should be made in regard to factors difficult to measure, to assess which is the perfect application of fuzzy sets theory. The paper will present a set ofmore » evaluation criteria, the part of the knowledge base and a description of the output variable.« less
NASA Astrophysics Data System (ADS)
Marhani, M. A.; Muksain, M. A. S.
2018-02-01
Malaysia has developed Green Building Index (GBI) as the green rating tool for buildings and townships to encourage sustainability in the construction industry. Understanding the roles and tasks of a contractor is essential in accomplishing the GBI assessment on a green building project. However, there are challenges in adapting the GBI. The objective of this paper is to identify the knowledge of contractor for each area of assessments in GBI’s checklist. Data were collected through the questionnaire surveys to the selected contractors, which were involved in GBI projects. The findings revealed that most of the respondents agreed and acknowledged the impact of each criterion in the assessment. Thus, it is highly recommended to educate and change the public perception on the awareness of the green building. Aside, more research and development (R&D) process should be encouraged to accelerate the GBI certificate implementation in the construction industry. In conclusion, proper education training, more legislative and financial framework are essential for the future of green building projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa
This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATLmore » Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.« less
2016-06-15
selection strategy is key to minimizing risk and ensuring best value for all stakeholders. On the basis of thorough market research , acquisition...administrative lead-time, Contractor Performance Assessment Reporting System ratings, and earned value management assessments) and source selection strategy ...Postgraduate School A. PURPOSE This research analyzes LPTA and tradeoff source selection strategies and contract outcomes to determine if a relationship
Code of Federal Regulations, 2010 CFR
2010-10-01
... marking of contractor bid or proposal information and source selection information. 1303.104-4 Section... PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 1303.104-4 Disclosure, protection and marking of contractor bid or proposal information and source selection information. Contractor bid or proposal...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., and marking of contractor bid or proposal information and source selection information. 603.104-4... contractor bid or proposal information and source selection information. (a) The following classes of persons may be authorized to receive contractor bid or proposal information or source selection information by...
Hsu, Pi-Fang; Wu, Cheng-Ru; Li, Ya-Ting
2008-01-01
While Taiwanese hospitals dispose of large amounts of medical waste to ensure sanitation and personal hygiene, doing so inefficiently creates potential environmental hazards and increases operational expenses. However, hospitals lack objective criteria to select the most appropriate waste disposal firm and evaluate its performance, instead relying on their own subjective judgment and previous experiences. Therefore, this work presents an analytic hierarchy process (AHP) method to objectively select medical waste disposal firms based on the results of interviews with experts in the field, thus reducing overhead costs and enhancing medical waste management. An appropriate weight criterion based on AHP is derived to assess the effectiveness of medical waste disposal firms. The proposed AHP-based method offers a more efficient and precise means of selecting medical waste firms than subjective assessment methods do, thus reducing the potential risks for hospitals. Analysis results indicate that the medical sector selects the most appropriate infectious medical waste disposal firm based on the following rank: matching degree, contractor's qualifications, contractor's service capability, contractor's equipment and economic factors. By providing hospitals with an effective means of evaluating medical waste disposal firms, the proposed AHP method can reduce overhead costs and enable medical waste management to understand the market demand in the health sector. Moreover, performed through use of Expert Choice software, sensitivity analysis can survey the criterion weight of the degree of influence with an alternative hierarchy.
ERIC Educational Resources Information Center
Robinson, Glenn S.; Trombley, Robert E.
2001-01-01
Discusses implementation of a thorough assessment program to determine the condition of boilers, pressure vessels and other plant equipment to determine the feasibility of part or entire system replacement. Assessment basics are examined as are tips for selecting the right inspection and engineering contractor for assessments. (GR)
Nine Steps to a Successful Lighting Retrofit.
ERIC Educational Resources Information Center
Ries, Jack
1998-01-01
Presents the steps needed to successfully design a lighting retrofit of school classrooms. Tips cover budgeting, technology, financing, contractor selection, assessing area function, and choosing a light source. (GR)
Materials technology assessment for a 1050 K Stirling space engine design
NASA Technical Reports Server (NTRS)
Scheuermann, Coulson M.; Dreshfield, Robert L.; Gaydosh, Darrell J.; Kiser, James D.; Mackay, Rebecca A.; Mcdaniels, David L.; Petrasek, Donald W.; Vannucci, Raymond D.; Bowles, Kenneth J.; Watson, Gordon K.
1988-01-01
An assessment of materials technology and proposed materials selection was made for the 1050 K (superalloy) Stirling Space Engine design. The objectives of this assessment were to evaluate previously proposed materials selections, evaluate the current state-of-the-art materials, propose potential alternate materials selections and identify research and development efforts needed to provide materials that can meet the stringent system requirements. This assessment generally reaffirmed the choices made by the contractor. However, in many cases alternative choices were described and suggestions for needed materials and fabrication research and development were made.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hsu, P.-F.; Wu, C.-R.; Li, Y.-T.
2008-07-01
While Taiwanese hospitals dispose of large amounts of medical waste to ensure sanitation and personal hygiene, doing so inefficiently creates potential environmental hazards and increases operational expenses. However, hospitals lack objective criteria to select the most appropriate waste disposal firm and evaluate its performance, instead relying on their own subjective judgment and previous experiences. Therefore, this work presents an analytic hierarchy process (AHP) method to objectively select medical waste disposal firms based on the results of interviews with experts in the field, thus reducing overhead costs and enhancing medical waste management. An appropriate weight criterion based on AHP is derivedmore » to assess the effectiveness of medical waste disposal firms. The proposed AHP-based method offers a more efficient and precise means of selecting medical waste firms than subjective assessment methods do, thus reducing the potential risks for hospitals. Analysis results indicate that the medical sector selects the most appropriate infectious medical waste disposal firm based on the following rank: matching degree, contractor's qualifications, contractor's service capability, contractor's equipment and economic factors. By providing hospitals with an effective means of evaluating medical waste disposal firms, the proposed AHP method can reduce overhead costs and enable medical waste management to understand the market demand in the health sector. Moreover, performed through use of Expert Choice software, sensitivity analysis can survey the criterion weight of the degree of influence with an alternative hierarchy.« less
NASA Astrophysics Data System (ADS)
Nawi, Mohd Nasrun Mohd; Azimi, Mohd Azrulfitri; Pozin, Mohd Affendi Ahmad; Osman, Wan Nadri; Anuar, Herman Shah
2016-08-01
Project Management Consultancy (PMC) is part of the management oriented procurement method in which a sole consultant is hired by the client to deal with the contactors in place of the client. Appointing contractors in this method or approach looks to be interesting as client could play a pivotal role in evaluating and selecting the supplier/contractor for the work package. In some cases, client gives the authority for the PMC to hire the supplier/contractor of their choice while in some cases the client is the one who made the decision. This research paper seeks to investigate the dilemma arises from this situation and for the purpose of this research, a real case study was studied to assess the impacts of such dilemma to the performance of the project. Recommendations on how to tackle the dilemma will also be addressed in the later part of this research paper.
Hanford Internal Dosimetry Project manual. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carbaugh, E.H.; Bihl, D.E.; MacLellan, J.A.
1994-07-01
This document describes the Hanford Internal Dosimetry Project, as it is administered by Pacific Northwest Laboratory (PNL) in support of the US Department of Energy and its Hanford contractors. Project services include administrating the bioassay monitoring program, evaluating and documenting assessment of potential intakes and internal dose, ensuring that analytical laboratories conform to requirements, selecting and applying appropriate models and procedures for evaluating radionuclide deposition and the resulting dose, and technically guiding and supporting Hanford contractors in matters regarding internal dosimetry. Specific chapters deal with the following subjects: practices of the project, including interpretation of applicable DOE Orders, regulations, andmore » guidance into criteria for assessment, documentation, and reporting of doses; assessment of internal dose, including summary explanations of when and how assessments are performed; recording and reporting practices for internal dose; selection of workers for bioassay monitoring and establishment of type and frequency of bioassay measurements; capability and scheduling of bioassay monitoring services; recommended dosimetry response to potential internal exposure incidents; quality control and quality assurance provisions of the program.« less
48 CFR 215.404-71-5 - Cost efficiency factor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... productivity measures may provide the basis for assessing the effectiveness of the contractor's cost reduction... asset utilization or improved productivity. (c) When selecting the percentage to use for this special...
Optimal Contractor Selection in Construction Industry: The Fuzzy Way
NASA Astrophysics Data System (ADS)
Krishna Rao, M. V.; Kumar, V. S. S.; Rathish Kumar, P.
2018-02-01
A purely price-based approach to contractor selection has been identified as the root cause for many serious project delivery problems. Therefore, the capability of the contractor to execute the project should be evaluated using a multiple set of selection criteria including reputation, past performance, performance potential, financial soundness and other project specific criteria. An industry-wide questionnaire survey was conducted with the objective of identifying the important criteria for adoption in the selection process. In this work, a fuzzy set based model was developed for contractor prequalification/evaluation, by using effective criteria obtained from the percept of construction professionals, taking subjective judgments of decision makers also into consideration. A case study consisting of four alternatives (contractors in the present case) solicited from a public works department of Pondicherry in India, is used to illustrate the effectiveness of the proposed approach. The final selection of contractor is made based on the integrated score or Overall Evaluation Score of the decision alternative in prequalification as well as bid evaluation stages.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaus, P.S.
1998-01-06
The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. Themore » Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team Final Report and the Internal Assessment Final Report.« less
Contractor evaluations in the contractor selection process.
DOT National Transportation Integrated Search
2014-04-01
The current contractor evaluation system in use within the Kentucky Transportation Cabinet is based on the contractor evaluation system developed as part of SPR 212-00 "Quality Based Prequalification of Contractors." This system relies on average per...
1997-12-16
The Inspector General, DoD, has issued several reports regarding the inadequacy of financial reporting for Government property in the custody of...We also assessed management controls affecting the financial reporting of Government property, and we assessed compliance with applicable laws and regulations.
Defining the performance gap: Conducting a self-assessment
NASA Technical Reports Server (NTRS)
Braymer, Susan A.; Stoner, David L.; Powell, William C.
1992-01-01
This paper presents two different approaches to performing self-assessments of continuous improvement activities. Case Study 1 describes the activities performed by JSC to assess the implementation of continuous improvement efforts at the NASA Center. The JSC approach included surveys administered to randomly selected NASA personnel and personal interviews with NASA and contractor management personnel. Case Study 2 describes the continuous improvement survey performed by the JSC Safety, Reliability, and Quality Assurance (SR&QA) organization. This survey consisted of a short questionnaire (50 questions) administered to all NASA and contractor SR&QA personnel. The questionnaire is based on the eight categories of the President's Award for Quality and Productivity Improvement. It is designed to objectively determine placement on the TQ benchmark and identify a roadmap for improvement.
Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method
NASA Astrophysics Data System (ADS)
Alptekin, Orkun; Alptekin, Nesrin
2017-10-01
Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., and marking of contractor bid or proposal information and source selection information. 3.104-4... BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 3.104-4 Disclosure, protection, and marking of contractor bid or proposal information and source selection information. (a) Except as...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., and marking of contractor bid or proposal information and source selection information. 2903.104-5... PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 2903.104-5 Disclosure, protection, and marking of contractor bid or proposal information and source selection information. (a) Government employees serving in...
10 CFR 436.33 - Procedures and methods for contractor selection.
Code of Federal Regulations, 2010 CFR
2010-01-01
... for contractor selection. (a) Competitive selection. Competitive selections based on solicitation of... synopsizes the proposed contract action. (2) Each competitive solicitation— (i) Shall request technical and... from those within the competitive range. (b) Unsolicited proposals. Federal agencies may— (1) Consider...
48 CFR 1852.217-71 - Phased acquisition using down-selection procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... NASA reserves the right to change them at any time up to and including the date upon which Phase 2... phases. In this technique, two or more contractors will be selected for Phase 1. It is expected that the single contractor for Phase 2 will be chosen from among these contractors after a competitive down...
48 CFR 1852.217-71 - Phased acquisition using down-selection procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... NASA reserves the right to change them at any time up to and including the date upon which Phase 2... phases. In this technique, two or more contractors will be selected for Phase 1. It is expected that the single contractor for Phase 2 will be chosen from among these contractors after a competitive down...
77 FR 6676 - Office of Inspector General; Contractor Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-09
... POSTAL SERVICE 39 CFR Part 230 Office of Inspector General; Contractor Requirements AGENCY: Postal... for contractors employed by the Office of Inspector General. The rule also emphasizes consistency in contractor selection, and clarifies the OIG's exclusive authority to set qualifications and standards for its...
addition to the above steps, DOE considered environmental factors in selecting a contractor for the contractor selection process. The environmental synopsis has been incorporated into the EISs. e-mail icon E
Contractor relationships and inter-organizational strategies in NASA's R and D acquisition process
NASA Technical Reports Server (NTRS)
Guiltinan, J.
1976-01-01
Interorganizational analysis of NASA's acquisition process for research and development systems is discussed. The importance of understanding the contractor environment, constraints, and motives in selecting an acquisition strategy is demonstrated. By articulating clear project goals, by utilizing information about the contractor and his needs at each stage in the acquisition process, and by thorough analysis of the inter-organizational relationship, improved selection of acquisition strategies and business practices is possible.
48 CFR 1852.217-72 - Phased acquisition using progressive competition down-selection procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... to and including the date upon which Phase 2 proposals are requested. Any such changes in evaluation... procurement using a progressive competition down-selection technique between phases. In this technique, two or more contractors will be selected for Phase 1. It is expected that the single contractor for Phase 2...
Code of Federal Regulations, 2010 CFR
2010-07-01
... cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...
48 CFR 253.209-1 - Responsible prospective contractors.
Code of Federal Regulations, 2014 CFR
2014-10-01
... contracts, or contracts which provide for progress payments based on costs or on a percentage or stage of...) Packaging. An assessment of the prospective contractor's ability to meet all contractual packaging...)). (E) Plant safety. An assessment of the prospective contractor's ability to meet the safety...
48 CFR 253.209-1 - Responsible prospective contractors.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Section III, Block 19, generally mean— (A) Technical capability. An assessment of the prospective contractor's key management personnel to determine if they have the basic technical knowledge, experience... completion. This includes— (1) An assessment of the prospective contractor's possession of, or the ability to...
29 CFR 2510.3-2 - Employee pension benefit plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., or the annuity contractors who may approach employees, to a number and selection which is designed to... the funding media or products available to employees, or the annuity contractors who could approach... employees affected, (B) The number of contractors who have indicated interest in approaching employees, (C...
29 CFR 2510.3-2 - Employee pension benefit plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., or the annuity contractors who may approach employees, to a number and selection which is designed to... the funding media or products available to employees, or the annuity contractors who could approach... employees affected, (B) The number of contractors who have indicated interest in approaching employees, (C...
29 CFR 2510.3-2 - Employee pension benefit plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., or the annuity contractors who may approach employees, to a number and selection which is designed to... the funding media or products available to employees, or the annuity contractors who could approach... employees affected, (B) The number of contractors who have indicated interest in approaching employees, (C...
29 CFR 2510.3-2 - Employee pension benefit plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., or the annuity contractors who may approach employees, to a number and selection which is designed to... the funding media or products available to employees, or the annuity contractors who could approach... employees affected, (B) The number of contractors who have indicated interest in approaching employees, (C...
29 CFR 2510.3-2 - Employee pension benefit plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., or the annuity contractors who may approach employees, to a number and selection which is designed to... the funding media or products available to employees, or the annuity contractors who could approach... employees affected, (B) The number of contractors who have indicated interest in approaching employees, (C...
76 FR 37704 - Federal Acquisition Regulation; Documenting Contractor Performance
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-28
... Federal Acquisition Regulation; Documenting Contractor Performance AGENCY: Department of Defense (DoD..., and to require all past performance information be entered into the Contractor Performance Assessment... Contractor Performance Information. These changes provide Governmentwide standardized evaluation factors and...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Are there certain people my group cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Are there certain people my group cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Are there certain people my group cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Are there certain people my group cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...
2015-08-27
ensure the functional assessment plans ( FAP ) for the three services contained all contractor work requiring assessment, measurable performance...review the FAPs after development and revisions to the FAPs , and did not require additional controls over the contractor assessment process in an...revised as follows: • Business Management System B-14.3 was updated to require the contract officer representative conduct a FAP review to ensure
48 CFR 970.1504-5 - Solicitation provision and contract clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...
48 CFR 970.1504-5 - Solicitation provision and contract clauses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...
48 CFR 970.1504-5 - Solicitation provision and contract clauses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...
48 CFR 970.1504-5 - Solicitation provision and contract clauses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...
48 CFR 970.1504-5 - Solicitation provision and contract clauses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., and marking of contractor bid or proposal information and source selection information. 203.104-4..., DEPARTMENT OF DEFENSE GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 203.104-4 Disclosure, protection, and marking of contractor bid or proposal information and source...
A strategic management model for evaluation of health, safety and environmental performance.
Abbaspour, Majid; Toutounchian, Solmaz; Roayaei, Emad; Nassiri, Parvin
2012-05-01
Strategic health, safety, and environmental management system (HSE-MS) involves systematic and cooperative planning in each phase of the lifecycle of a project to ensure that interaction among the industry group, client, contractor, stakeholder, and host community exists with the highest level of health, safety, and environmental standard performances. Therefore, it seems necessary to assess the HSE-MS performance of contractor(s) by a comparative strategic management model with the aim of continuous improvement. The present Strategic Management Model (SMM) has been illustrated by a case study and the results show that the model is a suitable management tool for decision making in a contract environment, especially in oil and gas fields and based on accepted international standards within the framework of management deming cycle. To develop this model, a data bank has been created, which includes the statistical data calculated by converting the HSE performance qualitative data into quantitative values. Based on this fact, the structure of the model has been formed by defining HSE performance indicators according to the HSE-MS model. Therefore, 178 indicators have been selected which have been grouped into four attributes. Model output provides quantitative measures of HSE-MS performance as a percentage of an ideal level with maximum possible score for each attribute. Defining the strengths and weaknesses of the contractor(s) is another capability of this model. On the other hand, this model provides a ranking that could be used as the basis for decision making at the contractors' pre-qualification phase or during the execution of the project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, Office of Health, Safety and Security, Office of Illness and Injury Prevention Programs
2007-10-01
The Department of Energy’s (DOE) Illness and Injury Surveillance Program (IISP) has monitored the health of contractor workers at selected DOE sites since 1990. For the first time, the IISP has sufficient data to describe, in a collective manner, the health trends occurring among workers at a number of DOE sites during a 10-year period. This brief report and the more detailed Worker Health Summary assess illness and injury trends of DOE workers according to gender, age, occupational group, and program office over the 10-year period, 1995 through 2004. During this time, over 137,000 individual contractor workers were employed atmore » the 15 DOE sites participating in the IISP.« less
Hanford internal dosimetry program manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carbaugh, E.H.; Sula, M.J.; Bihl, D.E.
1989-10-01
This document describes the Hanford Internal Dosimetry program. Program Services include administrating the bioassay monitoring program, evaluating and documenting assessments of internal exposure and dose, ensuring that analytical laboratories conform to requirements, selecting and applying appropriate models and procedures for evaluating internal radionuclide deposition and the resulting dose, and technically guiding and supporting Hanford contractors in matters regarding internal dosimetry. 13 refs., 16 figs., 42 tabs.
One of the criteria for selecting a contractor for high-rise construction
NASA Astrophysics Data System (ADS)
Tuskaeva, Zalina; Tagirov, Timur
2018-03-01
The mechanisms for management of the building complex used and proposed to date do not always provide the required result in the assessment of the construction organization facilities. Therefore, the development of new effective methods for such an assessment is an urgent task especially in questions related to high-rise construction. The article formally sets the task of assessing the technical facilities of a construction organization. Due to the use of expert methods, the weighted values of the coefficients of local indicators for technical facilities are identified
Pooling knowledge and improving safety for contracted works at a large industrial park.
Agnello, Patrizia; Ansaldi, Silvia; Bragatto, Paolo
2015-01-01
At a large chemical park maintenance is contracted by the major companies operating the plants to many small firms. The cultural and psychological isolation of contractor workers was recognized a root cause of severe accidents in the recent years. That problem is common in chemical industry. The knowledge sharing has been assumed a good key to involve contractors and sub contractors in safety culture and contributing to injuries prevention. The selection of personal protective equipment PPE for the maintenance works has been taken as benchmark to demonstrate the adequateness of the proposed approach. To support plant operators, contractors and subcontractors in PPE discussion, a method has been developed. Its core is a knowledge-base, organized in an Ontology, as suitable for inferring decisions. By means of this tool all stakeholders have merged experience and information and find out the right PPE, to be provided, with adequate training and information package. PPE selection requires sound competencies about process and environmental hazards, including major accident, preventive and protective measures, maintenance activities. These pieces of knowledge previously fragmented among plant operators and contractors, have to be pooled, and used to find out the adequate PPE for a number of maintenance works. The PPE selection is per se important, but it is also a good chance to break the contractors' isolation and involve them in safety objectives. Thus by pooling experience and practical knowledge, the common understanding of safety issues has been strengthened.
Assessment of Navy Contract Management Processes
2016-04-30
Defense (DoD) and defense contractor organizational contract management process capability. The CMMM has been previously applied at Air Force, Army...Navy, and defense contractor organizations. Specific to the Navy, assessments were conducted at three Navy contracting centers using the CMMM. These...agency’s poor contract planning, contract administration, and contractor oversight (DoDIG, 2009, 2012, 2013, 2014). The DoD’s response to the GAO’s high
Code of Federal Regulations, 2010 CFR
2010-10-01
... of vulnerabilities to IAEA inspections or visits; (ii) Notify the Contractor of the time at which the... with DoD officials in the assessment of vulnerabilities to IAEA inspections or visits. (d) Following a...) Whether the Contractor's facility has any vulnerabilities where potentially declarable activities under...
Assessing Contractor Capabilities for Streamlined Site Investigations
The purpose of this document is to familiarize and encourage brownfields decision makers to investigate and employ innovative methods for characterizing their sites, to assist brownfields decision makers in assessing contractors' capabilities.
NASA Technical Reports Server (NTRS)
1976-01-01
Ten advanced energy conversion systems for central-station, based-load electric power generation using coal and coal-derived fuels which were studied by NASA are presented. Various contractors were selected by competitive bidding to study these systems. A comparative evaluation is provided of the contractor results on both a system-by-system and an overall basis. Ground rules specified by NASA, such as coal specifications, fuel costs, labor costs, method of cost comparison, escalation and interest during construction, fixed charges, emission standards, and environmental conditions, are presented. Each system discussion includes the potential advantages of the system, the scope of each contractor's analysis, typical schematics of systems, comparison of cost of electricity and efficiency for each contractor, identification and reconciliation of differences, identification of future improvements, and discussion of outside comments. Considerations common to all systems, such as materials and furnaces, are also discussed. Results of selected in-house analyses are presented, in addition to contractor data. The results for all systems are then compared.
Afghan National Army: DOD Has Taken Steps to Remedy Poor Management of Vehicle Maintenance Program
2016-07-01
contract and program were designed to promote the accurate assessment of Afghan vehicle maintenance needs, contractor performance, and cost...containment; (2) the U.S. government provided effective management and oversight of contractor performance; and (3) the contract met its program objectives...maintenance, (2) underestimated the cost of spare parts, and (3) established performance metrics that did not accurately assess contractor performance or
48 CFR 3052.219-72 - Evaluation of prime contractor participation in the DHS mentor-protégé program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contractor participation in the DHS mentor-protégé program. 3052.219-72 Section 3052.219-72 Federal... Evaluation of prime contractor participation in the DHS mentor-protégé program. As prescribed in (HSAR) 48... the DHS Mentor-Protégé Program (JUN 2006) This solicitation contains a source selection factor or...
This document assists Brownfields grantees and other decision makers as they assess the capabilities of contractors and consultants to determine their qualifications to provide streamlined and innovative strategies for the assessment and and cleanup.
Guidance for Brownfields grantees and other decision makers to assess the capabilities of contractors and consultants to determine their qualifications to provide streamlined and innovative strategies for the assessment and cleanup of brownfields.
48 CFR 253.209-1 - Responsible prospective contractors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... required service. (B) Production capability. An evaluation of the prospective contractor's ability to plan.... (C) Quality assurance capability. An assessment of the prospective contractor's capability to meet the quality assurance requirements of the proposed contract. It may involve an evaluation of the...
#eVALUate: Monetizing Service Acquisition Trade-offs Using the QUALITY-INFUSED Price Methodology
2016-04-01
methodologies that are incompatible with the characteristics of services. These methodologies involve best-value source selection and contractor ...defense contractors for services, it lacks the key elements at the strategic and tactical levels to make service contracts a managed outcome (U.S...Regulation (FAR) defines a service contract as a “contract that directly engages the time and effort of a contractor whose primary purpose is to
Veterans’ Health Care: Improved Oversight of Community Care Physicians Credentials Needed
2016-09-01
Physicians’ Credentials Needed What GAO Found GAO found that the Department of Veterans Affairs’ (VA) contractors —Health Net Federal Services (Health...program, but were deficient in doing so under another program. Based on GAO’s review of selected physicians, GAO found that the contractors almost...program consistent with the requirements of the contract. In contrast, the contractors did not always verify credentials of the physicians in the
48 CFR 9.505-4 - Obtaining access to proprietary information.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest... use or (2) available to the Government or contractor from other sources without restriction. (b) A... source selection information by acquiring the services of marketing consultants which, if used in...
10 CFR 824.16 - Direction to NNSA contractors.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Direction to NNSA contractors. 824.16 Section 824.16 Energy DEPARTMENT OF ENERGY PROCEDURAL RULES FOR THE ASSESSMENT OF CIVIL PENALTIES FOR CLASSIFIED... the following actions that direct NNSA contractors or subcontractors. (1) Subpoenas; (2) Orders to...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The objective of this Energy Engineering Analysis (EEA) for LSAAP is threefold: Develop a systematic plan of projects which will result in reducing energy consumption. Consider renewable energy sources with the objective of establishing an orderly procedure for reducing use of non-renewable energy sources. Determine the feasibility of Total Energy (TE), Selective Energy (SE), and Central Heating Plant (CHP) concepts using alternative fuels. In essence, an assessment of the entire energy picture at LSAAP was undertaken. This report is a summary of that effort. LSAAP was originally built during 1941 and 1942 as a shell loading plant for the Army.more » After World War II, the facility was deactivated until 1951 when it was reactivated as a Government Owned, Contractor Operated (GOCO) facility. Day and Zimmerman was selected as the operator in 1951 and has been the operating contractor ever since. Located just west of Texarkana, Texas, LSAAP encompasses an area of approximately 15,546 acres. The primary mission of LSAAP is to load, assemble and pack ammunition and ammunition components for the Army.« less
RADON REDUCTION TECHNIQUES FOR DETACHED HOUSES, TECHNICAL GUIDANCE (SECOND EDITION)
This document is intended for use by State officials, radon mitigation contractors, building contractors, concerned homeowners, and other persons as an aid in the selection, design, and operation of radon reduction measurements for houses. It is the second edition of EPA's techn...
Assessment and Develop the Saudi's Contractors Classification System
ERIC Educational Resources Information Center
Almutairi, Saud
2017-01-01
Research has shown that construction projects in Saudi Arabia have had a perceived poor performance for the past three decades, from 1970-2016. The Saudi construction industry relies on a Contractor Classification System (CCS) to determine contractors' capabilities, and prevent underperformance. Through this study, a survey was conducted among…
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 42.502 - Selecting contracts for postaward orientation.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., and complexity of the contract; (c) Complexity and acquisition history of the product or service; (d... subcontracting; (h) Contractor's performance history and experience with the product or service; (i) Contractor's status, if any, as a small business, small disadvantaged, women-owned, veteran-owned, HUBZone, or service...
48 CFR 42.502 - Selecting contracts for postaward orientation.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., and complexity of the contract; (c) Complexity and acquisition history of the product or service; (d... subcontracting; (h) Contractor's performance history and experience with the product or service; (i) Contractor's status, if any, as a small business, small disadvantaged, women-owned, veteran-owned, HUBZone, or service...
48 CFR 42.502 - Selecting contracts for postaward orientation.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., and complexity of the contract; (c) Complexity and acquisition history of the product or service; (d... subcontracting; (h) Contractor's performance history and experience with the product or service; (i) Contractor's status, if any, as a small business, small disadvantaged, women-owned, veteran-owned, HUBZone, or service...
48 CFR 42.502 - Selecting contracts for postaward orientation.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., and complexity of the contract; (c) Complexity and acquisition history of the product or service; (d... subcontracting; (h) Contractor's performance history and experience with the product or service; (i) Contractor's status, if any, as a small business, small disadvantaged, women-owned, veteran-owned, HUBZone, or service...
Navy Virginia (SSN 774) Class Attack Submarine Procurement: Background and Issues for Congress
2016-10-25
proposed plan include the following: GD/EB is to be the prime contractor for designing and building Ohio replacement boats; HII/NNS is to be a...boats, and HII/NNS would receive 22%-23%; GD/EB is to continue as prime contractor for the Virginia-class program, but to help balance out projected...execute this strategy, GDEB has been selected as the prime contractor for OR with the responsibilities to deliver the twelve OR [Ohio replacement
48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...
48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...
Writing the Right Contract: Getting What You Want.
ERIC Educational Resources Information Center
Finkel, Karen E.
1998-01-01
Outsourcing of school services creates a need for educators to learn how best to select a contractor. Contracted student transportation is used to illustrate flexibility and creativity in writing a request for proposal, the evaluation process, and the importance of contractors' willingness to work alongside the district as a genuine business…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-04
..., Heating, and Air-Conditioning Contractors (NAICS code 238220), including Central air-conditioning system and commercial refrigeration installation; HVAC contractors. This list is not intended to be... selecting its highest ODP- weighted consumption year from among the years 1994 through 1997. [[Page 241...
NASA Technical Reports Server (NTRS)
Kelly, Michael P.
2011-01-01
Topics covered include: Develop Program/Project Quality Assurance Surveillance Plans The work activities performed by the developer and/or his suppliers are subject to evaluation and audit by government-designated representatives. CSO supports project by selecting on-site supplier representative s by one of several methods: (1) a Defense Contract Management Agency (DCMA) person via a Letter Of Delegation (LOD), (2) an independent assurance contractor (IAC) via a contract Audits, Assessments, and Assurance (A3) Contract Code 300 Mission Assurance Support Contract (MASC)
Orion GN and C Model Based Development: Experience and Lessons Learned
NASA Technical Reports Server (NTRS)
Jackson, Mark C.; Henry, Joel R.
2012-01-01
The Orion Guidance Navigation and Control (GN&C) team is charged with developing GN&C algorithms for the Exploration Flight Test One (EFT-1) vehicle. The GN&C team is a joint team consisting primarily of Prime Contractor (Lockheed Martin) and NASA personnel and contractors. Early in the GN&C development cycle the team selected MATLAB/Simulink as the tool for developing GN&C algorithms and Mathworks autocode tools as the means for converting GN&C algorithms to flight software (FSW). This paper provides an assessment of the successes and problems encountered by the GN&C team from the perspective of Orion GN&C developers, integrators, FSW engineers and management. The Orion GN&C approach to graphical development, including simulation tools, standards development and autocode approaches are scored for the main activities that the team has completed through the development phases of the program.
Independent Orbiter Assessment (IOA): FMEA/CIL assessment
NASA Technical Reports Server (NTRS)
Hinsdale, L. W.; Swain, L. J.; Barnes, J. E.
1988-01-01
The McDonnell Douglas Astronautics Company (MDAC) was selected to perform an Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL). Direction was given by the Orbiter and GFE Projects Office to perform the hardware analysis and assessment using the instructions and ground rules defined in NSTS 22206. The IOA analysis featured a top-down approach to determine hardware failure modes, criticality, and potential critical items. To preserve independence, the analysis was accomplished without reliance upon the results contained within the NASA and Prime Contractor FMEA/CIL documentation. The assessment process compared the independently derived failure modes and criticality assignments to the proposed NASA post 51-L FMEA/CIL documentation. When possible, assessment issues were discussed and resolved with the NASA subsystem managers. Unresolved issues were elevated to the Orbiter and GFE Projects Office manager, Configuration Control Board (CCB), or Program Requirements Control Board (PRCB) for further resolution. The most important Orbiter assessment finding was the previously unknown stuck autopilot push-button criticality 1/1 failure mode. The worst case effect could cause loss of crew/vehicle when the microwave landing system is not active. It is concluded that NASA and Prime Contractor Post 51-L FMEA/CIL documentation assessed by IOA is believed to be technically accurate and complete. All CIL issues were resolved. No FMEA issues remain that have safety implications. Consideration should be given, however, to upgrading NSTS 22206 with definitive ground rules which more clearly spell out the limits of redundancy.
48 CFR 970.5244-1 - Contractor purchasing system.
Code of Federal Regulations, 2014 CFR
2014-10-01
... forth in paragraphs (b) through (y) of this clause. (b) Acquisition of utility services. Utility... obligees. The penal amounts shall be determined in accordance with 48 CFR 28.102-2(b). (3) For fixed-price... $100,000, the Contractor shall select two or more of the payment protections at 48 CFR 28.102-1(b...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Disclosure, protection, and marking of contractor bid or proposal information and source selection information. 1403.104-4 Section 1403.104-4 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL IMPROPER...
Assessing the sustainable construction of large construction companies in Malaysia
NASA Astrophysics Data System (ADS)
Adewale, Bamgbade Jibril; Mohammed, Kamaruddeen Ahmed; Nasrun, Mohd Nawi Mohd
2016-08-01
Considering the increasing concerns for the consideration of sustainability issues in construction project delivery within the construction industry, this paper assesses the extent of sustainable construction among Malaysian large contractors, in order to ascertain the level of the industry's impacts on both the environment and the society. Sustainable construction explains the construction industry's responsibility to efficiently utilise the finite resources while also reducing construction impacts on both humans and the environment throughout the phases of construction. This study used proportionate stratified random sampling to conduct a field study with a sample of 172 contractors out of the 708 administered questionnaires. Data were collected from large contractors in the eleven states of peninsular Malaysia. Using the five-level rating scale (which include: 1= Very Low; 2= Low; 3= Moderate; 4= High; 5= Very High) to describe the level of sustainable construction of Malaysian contractors based on previous studies, statistical analysis reveals that environmental, social and economic sustainability of Malaysian large contractors are high.
Selected DOE headquarters publications
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1979-07-01
Selected DOE Headquarters Publications provides cumulative listings, from October 1, 1977 onward, of two groups of publications issued by headquarters organizations of the Department of Energy, and an index to their title keywords. The two groups consist of publications assigned a DOE/XXX-type report number code and headquarters contractor publications, prepared by contractors (and published by DOE) to describe research and development work they have performed for the Department. Publications such as pamphlets, fact sheets, bulletins, newsletters, and telephone directories, are omitted, as are publications issued under the DOE-tr, CONF, DOE/JPL, and DOE/NASA codes. (RWR)
On application of vector optimization in the problem of formation of portfolio of counterparties
NASA Astrophysics Data System (ADS)
Gorbich, A. L.; Medvedeva, M. A.; Medvedev, M. A.
2016-12-01
For the effective functioning of any enterprise it is necessary to choose the right partners: suppliers of raw material, buyers of finished products, with which the company interacts in the course of their business. However, the presence on the market of big amounts of enterprises makes the choice the most appropriate among them very difficult and requires the ability to objectively assess of the possible partners, based on multilateral analysis of their activities. This analysis can be carried out based on the solution of multiobjective problems of mathematical programming by using the methods of vector optimization. The work considers existing methods of selection of counterparties, as well as the theoretical foundations for the proposed methodology. It also describes a computer program that analyzes the raw data for contractors and allows choosing the best portfolio of suppliers of enterprise. The feature of selection of counterparties is that today's market has a large number of enterprises in similar activities. Successful choice of contractor will help to avoid unpleasant situations and financial losses, as well as to find a reliable partner in his person for the implementation of the production strategy of the company.
Contractor Sales Training: Providing the Skills Necessary to Sell Comprehensive Home Energy Upgrades
DOE Office of Scientific and Technical Information (OSTI.GOV)
Billingsley, Megan; Stuart, Elizabeth
2011-08-17
Many comprehensive home energy efficiency programs rely on contractors as the customer-facing ‘front line’ to sell energy improvements. Adding sales skills to contractors’ existing technical expertise is key to converting more assessments into comprehensive home energy upgrades. Leading programs recognize the need to support contractors with sales and business training to help them succeed and to support the growth of the home performance industry for the long term. A number of contractor sales training efforts are emerging, including some programs that are seeing encouraging early results.
ERIC Educational Resources Information Center
Carpenter, Polly; And Others
The Texarkana model of performance contracting consists of five major elements: (1) turnkeying of cost-effective new technology as a basic program goal, (2) use of a performance contract for instruction, (3) use of a management support contractor, (4) selection of the learning system contractor by formal competition, and (5) use of independent…
NASA Technical Reports Server (NTRS)
1994-01-01
Formed in Jan. 1992, the Panel to Review EOSDIS Plans was charged with advising NASA on its plans for developing the Earth Observing System (EOS) Data and Information System (EOSDIS). Specifically, the panel was asked to do the following: assess the validity of the engineering and technical underpinnings of the EOSDIS; assess its potential value to scientific users; suggest how technical risk can be minimized; and assess whether current plans are sufficiently resilient to be adaptable to changing technology and requirements such as budget environments, data volumes, new users, and new databases. The panel completed an interim report (Addendum A) and transmitted it to NASA and other interested parties in the government on 9 Apr. 1992. Because of a delay in NASA's plans to select the contractor for EOSDIS, the panel was not able to complete its review of the program according to the original government request. With the issuance of a letter report (Addendum B) on 28 Sep. 1992, the panel became inactive until such time as NASA could release the details of the contractor's proposed architecture, schedule, and costs for developing EOSDIS. In early 1993, NASA awarded the contract for the EOSDIS Core System (ECS). On 20 Apr. 1993, NASA asked the panel to reconvene to do the following: ( 1) complete its review of NASA's approach to the EOSDIS architecture and implementation; (2) appraise NASA's responses to the panel's previous recommendations; and (3) review the planning for EOSDIS in the context of NASA's role in the Global Change Data and Information System (GCDIS) implementation plan. To respond to the NASA charge, the panel met three times in 1993 including sessions with NASA officials and the EOSDIS contractor. In addition, several of the panel members visited individual Distributed Active Archive Centers (DAAC's) to obtain additional views of EOSDIS. The panel has now obtained substantial information on the EOSDIS budget, contractor work program, and current baseline architecture that was not previously available, due to procurement restrictions. This report presents the panel's findings and recommendations based on this additional information.
2017-02-01
must evaluate compliance with reporting requirements frequently so they can readily identify delinquent past performance reports.24 The FAR also...problems the contractor recovered from without impact to the contract/ order. There should have been no significant weaknesses identified. A...contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greenlaw, P.D.; Minick, S.K.
This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s results and are reported back to the participating contractors 30 days later. This report presents the results from the analysis of the 48th set of environmental quality assessment samplesmore » (QAP XLVIII) that were received on or before June 1, 1998.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... having significant difficulty performing his or her job. 1. A contractor is required to make reasonable... qualified if he or she satisfies all the skill, experience, education and other job-related selection... qualified” if he or she is qualified for a job, except that, because of a disability, he or she needs a...
Hsueh, Sung-Lin; Yan, Min-Ren
2013-01-01
The trends of the green supply chain are attributed to pressures from the environment and from customers. Green innovation is a practice for creating competitive advantage in sustainable development. To keep up with the changing business environment, the construction industry needs an appropriate assessment tool to examine the intrinsic and extrinsic effects regarding corporate competitive advantage. From the viewpoint of energy and environmental protection, this study combines four scientific methodologies to develop an assessment model for the green innovation of contractors. System dynamics can be used to estimate the future trends for the overall industrial structure and is useful in predicting competitive advantage in the industry. The analytic hierarchy process (AHP) and utility theory focus on the customer's attitude toward risk and are useful for comprehending changes in objective requirements in the environment. Fuzzy logic can simplify complicated intrinsic and extrinsic factors and express them with a number or ratio that is easy to understand. The proposed assessment model can be used as a reference to guide the government in examining the public constructions that qualified green contractors participate in. Additionally, the assessment model serves an indicator of relative competitiveness that can help the general contractor and subcontractor to evaluate themselves and further green innovations.
2013-01-01
The trends of the green supply chain are attributed to pressures from the environment and from customers. Green innovation is a practice for creating competitive advantage in sustainable development. To keep up with the changing business environment, the construction industry needs an appropriate assessment tool to examine the intrinsic and extrinsic effects regarding corporate competitive advantage. From the viewpoint of energy and environmental protection, this study combines four scientific methodologies to develop an assessment model for the green innovation of contractors. System dynamics can be used to estimate the future trends for the overall industrial structure and is useful in predicting competitive advantage in the industry. The analytic hierarchy process (AHP) and utility theory focus on the customer's attitude toward risk and are useful for comprehending changes in objective requirements in the environment. Fuzzy logic can simplify complicated intrinsic and extrinsic factors and express them with a number or ratio that is easy to understand. The proposed assessment model can be used as a reference to guide the government in examining the public constructions that qualified green contractors participate in. Additionally, the assessment model serves an indicator of relative competitiveness that can help the general contractor and subcontractor to evaluate themselves and further green innovations. PMID:24311979
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, M.R.
1991-02-01
In recent years the NASA Langley Research Center has funded several contractors to conduct conceptual designs defining architectures for fault tolerant computer systems. Such a system is referred to as a Multi-Path Redundant Avionics Suite (MPRAS), and would form the basis for avionics systems that would be used in future families of space vehicles in a variety of missions. The principal contractors were General Dynamics, Boeing, and Draper Laboratories. These contractors participated in a series of review meetings, and submitted final reports defining their candidate architectures. NASA then commissioned the Research Triangle Institute (RTI) to perform an assessment of thesemore » architectures to identify strengths and weaknesses of each. This report is a separate, independent review of the RTI assessment, done primarily to assure that the assessment was comprehensive and objective. The report also includes general recommendations relative to further MPRAS development.« less
A Management Case Analysis of the Department of Defense Contractor Risk Assessment Guide Program
1990-12-01
ORGANIZATION ......... 17 1. Past Government Organization Problems... 17 2. Current Government Organization ......... 17 3. The Contractor’s Organizatin ...Program and urged CODSIA to take a leadership role in encouraging its members to participate. The DCAA [Ref ll:p. 45] informed defense contractors in...conferences, and through the leadership of officials including the Under Secretary of the Navy for Acquisition, DOD Comptroller General, DOD Inspector General
Feasibility Analysis and Prototyping of a Fast Autonomous Recon system
2017-06-01
Test and Evaluation Interim Contractor Support System Assessment OPERATIONAL USE AND SYSTEM SUPPORT System Operation in the User Environment...Sustaining Maintenance and Logistics Support Operational Testing System Modifications for Improvement Contractor Support System Assessment...helicopter but has the added benefit of high -speed flight similar to a fixed-wing aircraft. Figure 1 shows the two different flight modes of the V-22
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false How are these repairs or construction trades persons, home building contractors, or construction companies selected and paid? 256.20 Section 256.20 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR HOUSING HOUSING IMPROVEMENT PROGRAM § 256.20 How are these repairs or construction trades persons...
An investigation and analysis of safety issues in Polish small construction plants.
Dąbrowski, Andrzej
2015-01-01
The construction industry is a booming sector of the Polish economy; however, it is stigmatised by a lower classification due to high occupational risks and an unsatisfactory state of occupational safety. Safety on construction sites is compromised by small construction firms which dominate the market and have high accident rates. This article presents the results of studies (using a checklist) conducted in small Polish construction companies in terms of selected aspects of safety, such as co-operation with the general contractor, occupational health and safety documents, occupational risk assessment, organization of work, protective gear and general work equipment. The mentioned studies and analyses provided the grounds to establish the main directions of preventive measures decreasing occupational risk in small construction companies, e.g., an increase in engagement of investors and general contractors, improvement of occupational health and safety (OSH) documents, an increase in efficiency of construction site managers, better stability of employment and removal of opposing objectives between economic strategy and work safety.
An investigation and analysis of safety issues in Polish small construction plants
Dąbrowski, Andrzej
2015-01-01
The construction industry is a booming sector of the Polish economy; however, it is stigmatised by a lower classification due to high occupational risks and an unsatisfactory state of occupational safety. Safety on construction sites is compromised by small construction firms which dominate the market and have high accident rates. This article presents the results of studies (using a checklist) conducted in small Polish construction companies in terms of selected aspects of safety, such as co-operation with the general contractor, occupational health and safety documents, occupational risk assessment, organization of work, protective gear and general work equipment. The mentioned studies and analyses provided the grounds to establish the main directions of preventive measures decreasing occupational risk in small construction companies, e.g., an increase in engagement of investors and general contractors, improvement of occupational health and safety (OSH) documents, an increase in efficiency of construction site managers, better stability of employment and removal of opposing objectives between economic strategy and work safety. PMID:26694002
DOT National Transportation Integrated Search
2006-02-01
In order to ensure top quality construction projects, contracts need to be awarded to the most qualified : contractor. At the time of this research, NMDOT projects often went to the lowest, not necessarily the : most qualified, bidder. The objective ...
48 CFR 36.602-1 - Selection criteria.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Selection criteria. 36.602-1 Section 36.602-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL... Selection criteria. (a) Agencies shall evaluate each potential contractor in terms of its— (1) Professional...
International space station wire program
NASA Technical Reports Server (NTRS)
May, Todd
1995-01-01
Hardware provider wire systems and current wire insulation issues for the International Space Station (ISS) program are discussed in this viewgraph presentation. Wire insulation issues include silicone wire contamination, Tefzel cold temperature flexibility, and Russian polyimide wire insulation. ISS is a complex program with hardware developed and managed by many countries and hundreds of contractors. Most of the obvious wire insulation issues are known by contractors and have been precluded by proper selection.
75 FR 81209 - Information Collection; National Incident Support Stakeholder Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-27
... define best practices. Stakeholders include Forest Service employees, other Federal agencies, industry... goal of determining the acquisition method which is in the best interest of the Federal government, imposes a reasonable risk on the contractor, yet also motivates effective contractor performance. The...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sanderson, C.G.; Scarpitta, S.C.
1991-07-01
This report presents the results from the analysis of the 34th set of environmental quality assessment samples (QAP 34) that were received on or before June 10, 1991. This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML's resultsmore » and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 3 days after the reporting deadline via a modem-telephone connection to the EML computer. The EML value'' listed in the tables to which the contractors' results are compared is the mean of replicate determination for each nuclide. The EML uncertainty is the standard error of the mean. All other uncertainties are as reported by the participants.« less
Stirling convertor performance mapping test results
NASA Astrophysics Data System (ADS)
Qiu, Songgang; Peterson, Allen A.; White, Maurice A.; Faultersack, Franklyn; Redinger, Darin L.; Petersen, Stephen L.
2002-01-01
The Department of Energy (DOE) has selected Free-Piston Stirling Convertors as a technology for future advanced radioisotope space power systems. In August 2000, DOE awarded competitive Phase I, Stirling Radioisotope Generator (SRG) power system integration contracts to three major aerospace contractors, resulting in SRG conceptual designs in February 2001. All three contractors based their designs on the Technology Demonstration Convertor (TDC) developed by Stirling Technology Company (STC) for DOE. The contract award to a single system integration contractor for Phases II and III of the SRG program is anticipated in late 2001. The first potential SRG mission is targeted for a Mars rover. Recent TDC performance data are provided in this paper, together with predictions from Stirling simulation models. .
Semi-annual report of the Department of Energy Quality Assessment Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sanderson, C.G.; Scarpitta, S.C.
1992-01-02
This report presents the results from the analysis of the 35th set of environmental quality assessment samples (QAP XXXV) that were received on or before December 5, 1991. This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s resultsmore » and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 3 days after the reporting deadline via a modem-telephone connection to the EML computer.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sanderson, C.G.; Scarpitta, S.C.
1992-07-01
This report presents the results from the analysis of the 36th set of environmental quality assessment samples (QAP 36) that were received on or before January 2, 1992. This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are complied with EML`s resultsmore » and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 3 days after the reporting deadline via a modem-telephone connection to the EML computer.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sanderson, C.G.; Greenlaw, P.
1996-02-01
This report presents the results from the analysis of the 43rd set of environmental quality assessment samples (QAP XLIII) that were received on or before December 1, 1995. This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s resultsmore » and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 2 days after the reporting deadline via a modem-telephone connection to the EML computer.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sanderson, C.G.; Greenlaw, P.; Pan, V.
1995-07-03
This report presents the results from the analysis of the 42st set of environmental quality assessment samples (QAP XLII) that were received on or before June 1, 1995. This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s resultsmore » and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 2 days after the reporting deadline via a modem-telephone connection to the EML computer.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greenlaw, P.D.
1998-01-01
This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s results and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 4 days after the reporting deadlinemore » via the Internet at www.eml.doe.gov. This report presents the results from the analysis of the 47th set of environmental quality assessment samples (QAP XLVII) that were received on or before December 1, 1997.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sanderson, C.G.; Klusek, C.S.
1993-07-01
This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s results and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 3 days after the reporting deadlinemore » via a modem-telephone connection to the EML computer. This report presents the results from the analysis of the 38th set of environmental quality assessment samples (QAP XXXVIII) that were received on or before June 2, 1993.« less
Navy Acquisition: Cost, Schedule, and Performance of New Submarine Combat Systems
1990-01-01
1985). Page 8 GAO/NSIAD-90-72 Submarine Combat Systems Chapter 1 Introduction In December 1983 the Navy awarded the International Business Machines...contracts to the General Electric Com- pany and the International Business Machines. In December 1987 the Navy selected General Electric as the prime...contractor and International Business Machines as the "follower" contractor. On March 31, 1988. the Navy awarded General Electric a $1.84 billion fixed
32 CFR Appendix B to Part 247 - CE Publications
Code of Federal Regulations, 2010 CFR
2010-07-01
... dining at a restaurant or attending a musical performance) of a commercial organization whose primary... potentially become the CE contractor. Upon evaluation of the competing proposals by the Source Selection Advisory Committee (SSAC) and selection of a winner by the selecting official, the CE contract shall be...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-19
... Ingersoll Rand Including On-Site Leased Workers From Aerotek, Express Personnel Services, Select Staffing... Ingersoll Rand, including on-site leased workers from Aerotek, Express Personnel Staffing, and Select... from Aerotek, Express Personnel Staffing, Select Staffing, and Mechanical Contractors, Inc., Pueblo...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sanderson, C.G.; Klusek, C.S.
1993-01-04
This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976. real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s results and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 3 days after the reporting deadlinemore » via a modem-telephone connection to the EML computer. This is the 42nd report of this program.« less
ERIC Educational Resources Information Center
American School & University, 1994
1994-01-01
Presents a resource guide for identifying, selecting, and specifying educational roofing systems. Explores the various types of roofing systems considered for most schools and describes how to select a roofing contractor and consultant. A roofing retrofit check list and roofing specification chart are provided. (GR)
NASA Astrophysics Data System (ADS)
Ding, Hao; Wang, Yong; Guo, Sini; Xu, Xiaofeng; Che, Cheng
2016-04-01
International projects are different from general domestic ones. In order to analyse the differences, a tripartite game model is built up to describe the relationship among owner, supervisor and general contractor, and some measures are given for the owner to more effectively complete the project. In addition, a project schedule selection model is formulated and a new benefit allocation method is proposed by introducing a new modified Shapley value with weighted factor.
Begum, Rawshan Ara; Siwar, Chamhuri; Pereira, Joy Jacqueline; Jaafar, Abdul Hamid
2007-01-01
Malaysia is facing an increase in the generation of waste and of accompanying problems with the disposal of this waste. In the last two decades, extensive building and infrastructure development projects have led to an increase in the generation of construction waste material. The construction industry has a substantial impact on the environment, and its environmental effects are in direct relation to the quality and quantity of the waste it generates. This paper discusses general characteristics of the construction contractors, the contractors' willingness to pay (WTP) for improved construction waste management, determining factors which affect the amount of their willingness to pay, and suggestions and policy implications in the perspective of construction waste management in Malaysia. The data in this study is based on contractors registered with the construction industry development board (CIDB) of Malaysia. Employing the open ended contingent valuation method, the study assessed the contractors' average maximum WTP for improved construction waste management to be RM69.88 (1US$=3.6 RM) per tonne of waste. The result shows that the average maximum WTP is higher for large contractors than for medium and small contractors. The highest average maximum WTP value is RM88.00 for Group A (large contractors) RM78.25 for Group B (medium-size contractors) and RM55.80 for Group C (small contractors). One of the contributions of this study is to highlight the difference of CIDB registration grade in the WTP for improved construction waste management. It is found that contractors' WTP for improved waste collection and disposal services increases with the increase in contractors' current paid up capital. The identified factors and determinants of the WTP will assist the formulation of appropriate policies in addressing the construction waste problem in Malaysia and indirectly improve the quality of construction in the country.
2005-03-17
private sector . However, along the way, Government and private sector industry have begun to disagree about how PPI is collected and how PPI is used. Industry prefers a passive system of collecting delivery and quality data during contract performance, while the Federal Government uses both a passive system (similar to industry) as well as an active system of pulling PPI during contract performance. Industry uses PPI to establish and maintain a preferred vendor list from which to solicit bids, quotes, or proposals, while government uses PPI to assess
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-29
...-readiness processes of potential contractors and subcontractors as a part of the source selection process... Supplement (DFARS) subpart 215.3, Source Selection. It amends DFARS 215.304(c) by adding paragraph (iv) to... and subcontractors shall be considered as a part of the source selection process for major defense...
48 CFR 519.7008 - Selection of protégé firms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7008 Selection of protégé firms. (a) Mentor firms will be solely responsible for selecting protégé firms. Mentors are encouraged to... subcontractor or a newly selected subcontractor for the prime contractor's GSA contract. (b) Mentor firms may...
Wu, Zezhou; Yu, Ann T W; Shen, Liyin
2017-02-01
The abundant generation of construction and demolition (C&D) waste presents a significant challenge to the sustainable development of the construction industry in Mainland China. As the implementer of construction activities, the contractor's C&D waste management performance plays an important role in C&D waste minimization. This paper aims to investigate the determinants of the contractor's C&D waste management behavior in Mainland China. The Theory of Planned Behavior (TPB) was selected as the basis of the theoretical model. In addition, three contextual constructs (i.e., economic viability, governmental supervision, and project constraints) were introduced, formulating the initial model. Based on the initial model, eight constructs were identified and seven hypotheses were proposed. A questionnaire survey was conducted to collect data and a Structural Equation Modeling (SEM) analysis was employed to test the proposed hypotheses. Results showed that the C&D waste management intention is not a significant determinant of contractor's C&D waste management behavior. The most important determinant is economic viability, followed by governmental supervision as the second most important determinant. Nevertheless, the construct of project constraints is an insignificant determinant for contractor's adoption of C&D waste management behavior. The research findings imply that, in Mainland China, the government, at this stage, plays an important role in guiding and promoting the contractor to exhibit better C&D waste management behavior. Copyright © 2016 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greenlaw, P.D.
1998-12-01
This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s results and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 4 days after the reporting deadlinemore » via the Internet at www.eml.doe.gov. This report presents the results from the analysis of the 49th set of environmental quality assessment samples (QAP XLIX) that were received on or before December 1, 1998.« less
Configuration Management Plan for the Tank Farm Contractor
DOE Office of Scientific and Technical Information (OSTI.GOV)
WEIR, W.R.
The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less
Development and validation of a strategic repositioning model for defense and aerospace contractors
NASA Astrophysics Data System (ADS)
Bers, John A.
Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing, technology, or operations). (7) The absence of a difference in performance may be partly due to natural selection. Noncommercial markets tend to attract contractors with more deliberative, consultative, and process-oriented corporate cultures, while commercial markets tend to attract contractors with results-oriented, opportunistic cultures.
Supplier Assessment System (SAS)
NASA Technical Reports Server (NTRS)
Dietrich, Kristen
2016-01-01
Background: Sponsored by NASA Headquarters; Charter - provide information to assist the quality assurance community in evaluating and determining supplier risk; Comprehensive on-line repository of supplier information; Available to approved civil service personnel from all NASA Centers, other U.S. Government Agencies, Prime Contractors, and NASA direct support contractors; User access to specific data types or documents is controlled as needed.
27 CFR 70.231 - Protection for certain interests even though notice filed.
Code of Federal Regulations, 2010 CFR
2010-04-01
... notice of tax lien was filed before the mechanic undertook the work or that the mechanic knew of the lien before undertaking the work. (f) Real property tax and special assessment liens. Even though a notice of... filed before the contractor undertakes the work or that the contractor knew of the lien before...
Tiger Team Assessment of the Ames Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-03-01
This report documents the Tiger Assessment of the Ames Laboratory (Ames), located in Ames, Iowa. Ames is operated for the US Department of Energy (DOE) by Iowa State University. The assessment was conducted from February 10 to March 5, 1992, under the auspices of the Office of Special Projects, Office of the Assistant Secretary of Environment, Safety and Health, Headquarters, DOE. The assessment was comprehensive, encompassing Environment, Safety, and Health (ES H) disciplines; management practices; and contractor and DOE self-assessments. Compliance with applicable Federal, State of Iowa, and local regulations; applicable DOE Orders; best management practices; and internal requirements atmore » Ames Laboratory were assessed. In addition, an evaluation of the adequacy and effectiveness of DOE and the site contractor's management of ES H/quality assurance program was conducted.« less
Orion Orbit Control Design and Analysis
NASA Technical Reports Server (NTRS)
Jackson, Mark; Gonzalez, Rodolfo; Sims, Christopher
2007-01-01
The analysis of candidate thruster configurations for the Crew Exploration Vehicle (CEV) is presented. Six candidate configurations were considered for the prime contractor baseline design. The analysis included analytical assessments of control authority, control precision, efficiency and robustness, as well as simulation assessments of control performance. The principles used in the analytic assessments of controllability, robustness and fuel performance are covered and results provided for the configurations assessed. Simulation analysis was conducted using a pulse width modulated, 6 DOF reaction system control law with a simplex-based thruster selection algorithm. Control laws were automatically derived from hardware configuration parameters including thruster locations, directions, magnitude and specific impulse, as well as vehicle mass properties. This parameterized controller allowed rapid assessment of multiple candidate layouts. Simulation results are presented for final phase rendezvous and docking, as well as low lunar orbit attitude hold. Finally, on-going analysis to consider alternate Service Module designs and to assess the pilot-ability of the baseline design are discussed to provide a status of orbit control design work to date.
41 CFR 60-250.20 - Covered employment activities.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., organizational structures, position descriptions, lines of progression, and seniority lists; (e) Leaves of... not administered by the contractor; (g) Selection and financial support for training, including...
41 CFR 60-300.20 - Covered employment activities.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., organizational structures, position descriptions, lines of progression, and seniority lists; (e) Leaves of... not administered by the contractor; (g) Selection and financial support for training, including...
41 CFR 60-741.20 - Covered employment activities.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., organizational structures, position descriptions, lines of progression, and seniority lists; (e) Leaves of... not administered by the contractor; (g) Selection and financial support for training, including...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rowsell, David Leon
This report documents the Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation. The review followed the approved Plan of Action (POA) and Implementation Plan (IP) using the identified core requirements. The activity was limited scope focusing on the control rod drives functional isolation and fuel element movement. The purpose of this review is to ensure the facility's readiness to move fuel elements thus supporting inspection and functionally isolate the control rod drives to maintain the required shutdown margin.
Energize New York -- Residential Energy Efficiency Market Transformation in New York
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bregman, Thomas M.
2013-12-31
Energize New York (ENY) is focused on addressing known barriers to widespread energy efficiency (EE) adoption by property owners. In simple terms ENY works to; 1) increase homeowner trust by using known and trusted community leaders to communicate their own positive experiences with EE and ENY, 2) reduce friction points by integrating support staff and creative use of technology that ease a homeowner’s way forward through the EE upgrade process, 3) increase homeowner knowledge and trust of specific EE benefits through access to the ENY energy coach, 4) provide information on available financing options that show benefits (e.g. positive cashmore » flow), and 5) provide tools and mechanisms that give homeowners greater comfort in evaluating and selecting the right contractor. These five fundamental program aspects are supported by a hyper-local communications and outreach model and a “lead by example” philosophy that requires community leaders to step forward and model energy efficiency behavior by example. In the communities where the program has successfully engaged local leadership and “trusted community sources” there has been a significant increase in the uptake of energy efficiency work. Quantitatively this growth translated into an increase of 240% in completed Home Performance projects from the two year pre-pilot period (2009-10) to the two year post-pilot period (2012-13). Additionally, the program has seen measureable increases in the output and performance of contractors who are members of the Energize Comfort Corps, a program innovation which included a subset of the NYSERDA approved and Building Performance Institute accredited home performance contractors. This innovation, launched in the later stages of the pilot, is paired with the Energize Contractor Ratings Index (CRI) and helps frame the provider market by giving homeowners a mechanism to provide and receive feedback on their contractor experience. The data incorporated into the CRI along with the ECC selection process, has measurably reduced a key decision barrier (“which contractor should I use”) for homeowners engaged in the EE decision making process.« less
15 CFR Supplement No. 13 to Part 760 - Interpretation
Code of Federal Regulations, 2010 CFR
2010-01-01
... alters the effect of this clause. The effect is to draw the contractor into the decision-making process... service because of the presumed intrusion of boycott-based criteria into the selection process. Thus... selecting a single supplier or subcontractor for each element of the contract. The boycotting country buyer...
10 CFR 436.33 - Procedures and methods for contractor selection.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) May state that if the Federal agency requires a detailed energy survey which identifies life cycle... savings performance project, Federal agencies shall publish a Commerce Business Daily notice which... select a firm on a qualified list to conduct the project. (4) If a proposed energy cost savings project...
The contractor`s role in low-level waste disposal facility application review and licensing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Serie, P.J.; Dressen, A.L.
1991-12-31
The California Department of Health Services will soon reach a licensing decision on the proposed Ward Valley low-level radioactive waste disposal facility. As the first regulatory agency in the country to address the 10 CFR Part 61 requirements for a new disposal facility, California`s program has broken new ground in its approach. Throughout the review process, the Department has relied on contractor support to augment its technical and administrative staff. A team consisting of Roy F. Weston, Inc., supported by ERM-Program Management Corp., Environmental Issues Management, Inc., and Rogers and Associates Engineering Corporation, has worked closely with the Department inmore » a staff extension role. The authors have been involved with the project in contractor project management roles since 1987, and continue to support the Department`s program as it proceeds to finalize its licensing process. This paper describes the selection process used to identify a contractor team with the needed skills and experience, and the makeup of team capabilities. It outlines the management, communication, and technical approaches used to assure a smooth agency-contractor function and relationship. It describes the techniques used to ensure that decisions and documents represented the Department credibly in its role as the regulatory and licensing agency under the Nuclear Regulatory Commission (NRC) Agreement State program. The paper outlines the license application review process and activities, through preparation of licensing documentation and responses to public comments. Lessons learned in coordination of an agency-contractor team effort to review and license a low-level waste disposal facility are reviewed and suggestions made for approaching a similar license application review and licensing situation.« less
Introduction to solar heating and cooling design and sizing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This manual is designed to introduce the practical aspects of solar heating/cooling systems to HVAC contractors, architects, engineers, and other interested individuals. It is intended to enable readers to assess potential solar heating/cooling applications in specific geographical areas, and includes tools necessary to do a preliminary design of the system and to analyze its economic benefits. The following are included: the case for solar energy; solar radiation and weather; passive solar design; system characteristics and selection; component performance criteria; determining solar system thermal performance and economic feasibility; requirements, availability, and applications of solar heating systems; and sources of additional information.more » (MHR)« less
EPA Region 9 Targeted Brownfields Assessment (TBA) Application
EPA provides contractor assistance for property assessment to determine eligibility for up to $100,000 worth of technical assistance. Use this assessment form for properties in Arizona, California, Nevada, and Hawaii.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Honeyman, J.O.
1998-01-09
This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technicalmore » Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less
Design Criteria for Controlling Stress Corrosion Cracking
NASA Technical Reports Server (NTRS)
Franklin, D. B.
1987-01-01
This document sets forth the criteria to be used in the selection of materials for space vehicles and associated equipment and facilities so that failure resulting from stress corrosion will be prevented. The requirements established herein apply to all metallic components proposed for use in space vehicles and other flight hardware, ground support equipment, and facilities for testing. These requirements are applicable not only to items designed and fabricated by MSFC (Marshall Space Flight Center) and its prime contractors, but also to items supplied to the prime contractor by subcontractors and vendors.
Navy Construction Contract Regulations versus the Board of Contract Appeals.
1987-12-01
This is unfortunate because the amount of useful knowledge in the cases is vast, but the access to it is time- comsuming . The selection of the cases is...AlE) was out of town. This figure cannot be used blindly. Other factors such as Government behavior , contractor behavior , or nature of the submittal...job. To complicate matters, t "h C (-,n t r a c:i n:; I:Dict.r may not be aware of th_ contractor’ h.me _.f... overhead behavior . The alternative Is
Features of the marketing strategy of oil and gas companies in exploration drilling
NASA Astrophysics Data System (ADS)
Sharf, I.; Malanina, V.; Kamynina, L.
2014-08-01
The implementation of national and regional programs for the development of new oil and gas provinces of Eastern Siberia poses the challenge of increasing geological exploration. The current drilling service companies' market structure, as well as the strategic task of search and exploration effectiveness requires qualitatively new approaches for choosing a contractor. The proposed strategy to select a contractor based on comprehensive analysis of certain groups of industrial, financial, infrastructural criteria allows not only to optimize the costs of exploration activities, but also to minimize preventively the risks of a poor geological exploration. The authors' SWOT- analysis of the marketing strategy of "Gazprom neft" for choosing a contractor outlined the problem of imperfection of the Russian legislation in the sphere of activities of service companies in the oil and gas sector.
Summary Report on Financial Reporting of Government Property in the Custody of Contractors.
1998-10-15
and Air Force Audit Agency on the financial reporting of Government property in the custody of contractors. The reported amount of Government...Contract Property Management System are used for financial reporting . However, the system and the way the data are entered into financial statements...assessed management controls affecting the financial reporting of Government property and compliance with applicable laws and regulations.
34 CFR 377.11 - What is the content of an application for an award?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., including assisting the Department's contractor in selecting and obtaining data for a control group established through random assignment or by the selection of a matched comparison group; and (5) Individuals... any quality assurance and cost-control criteria established by the State; (5) The manner in which the...
34 CFR 377.11 - What is the content of an application for an award?
Code of Federal Regulations, 2012 CFR
2012-07-01
..., including assisting the Department's contractor in selecting and obtaining data for a control group established through random assignment or by the selection of a matched comparison group; and (5) Individuals... any quality assurance and cost-control criteria established by the State; (5) The manner in which the...
34 CFR 377.11 - What is the content of an application for an award?
Code of Federal Regulations, 2011 CFR
2011-07-01
..., including assisting the Department's contractor in selecting and obtaining data for a control group established through random assignment or by the selection of a matched comparison group; and (5) Individuals... any quality assurance and cost-control criteria established by the State; (5) The manner in which the...
34 CFR 377.11 - What is the content of an application for an award?
Code of Federal Regulations, 2014 CFR
2014-07-01
..., including assisting the Department's contractor in selecting and obtaining data for a control group established through random assignment or by the selection of a matched comparison group; and (5) Individuals... any quality assurance and cost-control criteria established by the State; (5) The manner in which the...
34 CFR 377.11 - What is the content of an application for an award?
Code of Federal Regulations, 2010 CFR
2010-07-01
..., including assisting the Department's contractor in selecting and obtaining data for a control group established through random assignment or by the selection of a matched comparison group; and (5) Individuals... any quality assurance and cost-control criteria established by the State; (5) The manner in which the...
48 CFR 36.301 - Use of two-phase design-build selection procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contractors. (iv) The suitability of the project for use of the two-phase selection method. (v) The capability... officer determines that this method is appropriate, based on the following: (1) Three or more offers are... been considered: (i) The extent to which the project requirements have been adequately defined. (ii...
National Assessment of Urban Rail Noise
DOT National Transportation Integrated Search
1979-03-01
This report summarizes seven individual noise assessments of the urban rail transit systems in Boston, New York City, Philadelphia, Lindenwold (N.J.), Cleveland, Chicago, and San Francisco. The assessments were performed by DOT and contractor researc...
17 CFR 200.630 - General prohibitions against discrimination.
Code of Federal Regulations, 2010 CFR
2010-04-01
... ORGANIZATION; CONDUCT AND ETHICS; AND INFORMATION AND REQUESTS Enforcement of Nondiscrimination on the Basis of... with handicaps. (5) The agency, in the selection of procurement contractors, may not use criteria that...
40 CFR 35.936-5 - Grantee responsibility.
Code of Federal Regulations, 2014 CFR
2014-07-01
... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.936-5..., selection of contractors, award of contracts, protests of award, claims, disputes, and other related...
23 CFR 450.310 - Metropolitan planning organization designation and redesignation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... staff resources of other agencies, non-profit organizations, or contractors to carry out selected... serves a TMA; or (4) Periodic rotation of members representing units of general-purpose local government...
Review of road user costs and methods.
DOT National Transportation Integrated Search
2013-07-01
The South Dakota Department of Transportation (SDDOT) uses road user costs (RUC) to calculate incentive or disincentive compensation for contractors, quantify project-specific liquidated damages, select the ideal sequencing of a project, and forecast...
48 CFR 570.105-2 - Two-phase design-build selection procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... lease construction projects with options to purchase the real property leased. Use the procedures in.... (iii) The capability and experience of potential contractors. (iv) The suitability of the project for...
Fiscal Year 2014: Comprehensive Oversight Plan for Southwest Asia
2013-09-30
rule of law. We plan to focus primarily on DOS Bureau of International Narcotics and Law Enforcement (INL) Justice Sector Support Program ( JSSP ...Specifically, (1) assess whether JSSP contractor(s) provided qualified trainers and services in accordance with the terms of the contract(s); (2...and USAID justice sector training efforts and determine the extent to which these programs complement the JSSP . (Project: SIGAR-073A) Dec-12 Oct-13
Duty to Cooperate and Not Hinder
1988-02-14
Acts doctrine, lack of materiality , and the on-scene arrival of a reprocurement contractor, may preclude a contractor from recovering for any such acts... tolerated and where the Government stated that there was an urgent need for V S. completion in conjunction with threatening to assess755 liquidated... guidelines for reestablishing a delivery /8 schedule. Duress has been found where the Government did not in fact possess the right to terminate. In
DOE Office of Scientific and Technical Information (OSTI.GOV)
ADAMS, WADE C
The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys include gamma surface scans, gamma direct measurements, and soil sampling.
DOE Office of Scientific and Technical Information (OSTI.GOV)
ADAMS, WADE C
The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys included gamma surface scans, gamma direct measurements, and soil sampling.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-05-01
This technical memorandum presents Preliminary Remediation Goals (PRGs) for use in human health risk assessment efforts under the United States Department of Energy, Oak Ridge Operations Office Environmental Restoration (ER) Division. This document provides the ER Division with standardized PRGs which are integral to the Remedial Investigation/Feasibility Study process. They are used during project scooping (Data Quality Objectives development), in screening level risk assessments to support early action or No Further Investigation decisions, and in the baselines risk assessment where they are employed in the selection of chemicals of potential concern. The primary objective of this document is to standardizemore » these values and eliminate any duplication of effort by providing PRGs to all contractors involved in risk activities. In addition, by managing the assumptions and systems used in PRG derivation, the ER Risk Assessment Program will be able to control the level of quality assurance associated with these risk-based guideline values.« less
ERIC Educational Resources Information Center
Donaldosn, William S.; Stephens, Thomas M.
1979-01-01
Sections address the RFP/IFB (Request for Proposals/Invitation for Bids) process and procedures for selecting the "best" contract. In reviewing the federal procurement code, and the recent decision of the Government Accounting Office, particularly regarding the NIMIS (National Instructional Materials Information System contract), inconsistencies…
29 CFR 37.7 - What specific discriminatory actions based on disability are prohibited by this part?
Code of Federal Regulations, 2010 CFR
2010-07-01
... WIA or this part. (g) A recipient, in the selection of contractors, must not use criteria that subject..., licensing, or other arrangements, use standards, procedures, criteria, or administrative methods: (1) That... site or location of facilities, a grant applicant or recipient must not make selections that have any...
Subaru FATS (fault tracking system)
NASA Astrophysics Data System (ADS)
Winegar, Tom W.; Noumaru, Junichi
2000-07-01
The Subaru Telescope requires a fault tracking system to record the problems and questions that staff experience during their work, and the solutions provided by technical experts to these problems and questions. The system records each fault and routes it to a pre-selected 'solution-provider' for each type of fault. The solution provider analyzes the fault and writes a solution that is routed back to the fault reporter and recorded in a 'knowledge-base' for future reference. The specifications of our fault tracking system were unique. (1) Dual language capacity -- Our staff speak both English and Japanese. Our contractors speak Japanese. (2) Heterogeneous computers -- Our computer workstations are a mixture of SPARCstations, Macintosh and Windows computers. (3) Integration with prime contractors -- Mitsubishi and Fujitsu are primary contractors in the construction of the telescope. In many cases, our 'experts' are our contractors. (4) Operator scheduling -- Our operators spend 50% of their work-month operating the telescope, the other 50% is spent working day shift at the base facility in Hilo, or day shift at the summit. We plan for 8 operators, with a frequent rotation. We need to keep all operators informed on the current status of all faults, no matter the operator's location.
The forecast for RAC extrapolation: mostly cloudy.
Goldman, Elizabeth; Jacobs, Robert; Scott, Ellen; Scott, Bonnie
2011-09-01
The current statutory and regulatory guidance for recovery audit contractor (RAC) extrapolation leaves providers with minimal protection against the process and a limited ability to challenge overpayment demands. Providers not only should understand the statutory and regulatory basis for extrapolation forecast, but also should be able to assess their extrapolation risk and their recourse through regulatory safeguards against contractor error. Providers also should aggressively appeal all incorrect RAC denials to minimize the potential impact of extrapolation.
1987-08-01
take place in both contractor and government facilities. The on-orbit evaluation could utilize modified launch facilities depending on the launch...technological issues : o Telescope Optics: Verify that the distortions associated vith large optical elements satisfy detection and tracking requirements; verify...Validation program vould be car- ried out at contractor facilities that 1’ave not been identified and at six government facilities (Arnold Engineering
Employment arrangement, job stress, and health-related quality of life ☆
Ray, Tapas K.; Kenigsberg, Tat’Yana A.; Pana-Cryan, Regina
2017-01-01
Objective We aimed to understand the characteristics of U.S. workers in non-standard employment arrangements, and to assess associations between job stress and Health-related Quality of Life (HRQL) by employment arrangement. Background As employers struggle to stay in business under increasing economic pressures, they may rely more on non-standard employment arrangements, thereby increasing the pool of contingent workers. Worker exposure to job stress may vary by employment arrangement. Excessive exposure to stressors at work is considered to be a potential health hazard, and may adversely affect health and HRQL. Methods We used the Quality of Worklife (QWL) module which supplemented the General Social Survey (GSS) in 2002, 2006, 2010, and 2014. GSS is a biannual, nationally representative cross-sectional survey of U.S. households that yields a representative sample of the civilian, non-institutionalized, English-speaking, U.S. adult population. The QWL module assesses an array of psychosocial working conditions and quality of work life topics among GSS respondents. We used pooled QWL responses from 2002 to 2014 by only those who reported being employed at the time of the survey. After adjusting for sampling probabilities, including subsampling for non-respondents and correcting for the number of adults in the household, 6005 respondents were included in our analyses. We grouped respondents according to their employment arrangement, including: (i) independent contractors (contractor), (ii) on call workers (on call), (iii) workers paid by a temporary agency (temporary), (iv) workers who work for a contractor (under contract), or (v) workers in standard employment arrangements (standard). Respondents were further grouped into those who were stressed and those who were not stressed at work. Descriptive population prevalence rates were calculated by employment arrangement for select demographic and organizational characteristics, psychosocial working conditions, work-family balance, and health and well-being outcomes. We also assessed the effect of employment arrangement on job stress, and whether job stress was associated with the number of reported unhealthy days and days with activity limitations. These two health and well-being outcomes capture aspects of worker HRQL. Results Our results underscored the importance of employment arrangement in understanding job stress and associated worker health and well-being outcomes. Between 2002 and 2014, the prevalence of workers in non-standard employment arrangements increased from 19% to 21%; however, the observed trend did not monotonically increase during that period. Compared with workers in standard arrangements, independent contractors and on call workers were significantly less likely to report experiencing job stress. For workers in standard arrangements and for contractors, we observed significant association between perceived job stress and reported unhealthy days. We observed a similar association for reported days with activity limitations, for workers in standard and temporary arrangements. Conclusion The major contribution of our study was to highlight the differences in job stress and HRQL by employment arrangement. Our results demonstrated the importance of studying each of these employment arrangements separately and in depth. Furthermore, employment arrangement was an important predictor of job stress, and compared with non-stressed workers, stressed workers across all employment arrangements reported more unhealthy days and more days with activity limitations. PMID:29097848
Employment arrangement, job stress, and health-related quality of life.
Ray, Tapas K; Kenigsberg, Tat'Yana A; Pana-Cryan, Regina
2017-12-01
We aimed to understand the characteristics of U.S. workers in non-standard employment arrangements, and to assess associations between job stress and Health-related Quality of Life (HRQL) by employment arrangement. As employers struggle to stay in business under increasing economic pressures, they may rely more on non-standard employment arrangements, thereby increasing the pool of contingent workers. Worker exposure to job stress may vary by employment arrangement. Excessive exposure to stressors at work is considered to be a potential health hazard, and may adversely affect health and HRQL. We used the Quality of Worklife (QWL) module which supplemented the General Social Survey (GSS) in 2002, 2006, 2010, and 2014. GSS is a biannual, nationally representative cross-sectional survey of U.S. households that yields a representative sample of the civilian, non-institutionalized, English-speaking, U.S. adult population. The QWL module assesses an array of psychosocial working conditions and quality of work life topics among GSS respondents. We used pooled QWL responses from 2002 to 2014 by only those who reported being employed at the time of the survey. After adjusting for sampling probabilities, including subsampling for non-respondents and correcting for the number of adults in the household, 6005 respondents were included in our analyses. We grouped respondents according to their employment arrangement, including: (i) independent contractors (contractor), (ii) on call workers (on call), (iii) workers paid by a temporary agency (temporary), (iv) workers who work for a contractor (under contract), or (v) workers in standard employment arrangements (standard). Respondents were further grouped into those who were stressed and those who were not stressed at work. Descriptive population prevalence rates were calculated by employment arrangement for select demographic and organizational characteristics, psychosocial working conditions, work-family balance, and health and well-being outcomes. We also assessed the effect of employment arrangement on job stress, and whether job stress was associated with the number of reported unhealthy days and days with activity limitations. These two health and well-being outcomes capture aspects of worker HRQL. Our results underscored the importance of employment arrangement in understanding job stress and associated worker health and well-being outcomes. Between 2002 and 2014, the prevalence of workers in non-standard employment arrangements increased from 19% to 21%; however, the observed trend did not monotonically increase during that period. Compared with workers in standard arrangements, independent contractors and on call workers were significantly less likely to report experiencing job stress. For workers in standard arrangements and for contractors, we observed significant association between perceived job stress and reported unhealthy days. We observed a similar association for reported days with activity limitations, for workers in standard and temporary arrangements. The major contribution of our study was to highlight the differences in job stress and HRQL by employment arrangement. Our results demonstrated the importance of studying each of these employment arrangements separately and in depth. Furthermore, employment arrangement was an important predictor of job stress, and compared with non-stressed workers, stressed workers across all employment arrangements reported more unhealthy days and more days with activity limitations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... DETERMINATION PROCEDURES AND CRITERIA § 768.7 Procedures. (a) Initiation of an assessment. (1) Once BIS accepts... initiating the assessment. (2) BIS will publish a Federal Register notice of the initiation of any assessment... initiated an assessment. Each such department, agency, and contractor shall provide BIS all relevant...
Code of Federal Regulations, 2014 CFR
2014-01-01
... DETERMINATION PROCEDURES AND CRITERIA § 768.7 Procedures. (a) Initiation of an assessment. (1) Once BIS accepts... initiating the assessment. (2) BIS will publish a Federal Register notice of the initiation of any assessment... initiated an assessment. Each such department, agency, and contractor shall provide BIS all relevant...
Code of Federal Regulations, 2011 CFR
2011-01-01
... DETERMINATION PROCEDURES AND CRITERIA § 768.7 Procedures. (a) Initiation of an assessment. (1) Once BIS accepts... initiating the assessment. (2) BIS will publish a Federal Register notice of the initiation of any assessment... initiated an assessment. Each such department, agency, and contractor shall provide BIS all relevant...
Code of Federal Regulations, 2013 CFR
2013-01-01
... DETERMINATION PROCEDURES AND CRITERIA § 768.7 Procedures. (a) Initiation of an assessment. (1) Once BIS accepts... initiating the assessment. (2) BIS will publish a Federal Register notice of the initiation of any assessment... initiated an assessment. Each such department, agency, and contractor shall provide BIS all relevant...
Configuration Management Process Assessment Strategy
NASA Technical Reports Server (NTRS)
Henry, Thad
2014-01-01
Purpose: To propose a strategy for assessing the development and effectiveness of configuration management systems within Programs, Projects, and Design Activities performed by technical organizations and their supporting development contractors. Scope: Various entities CM Systems will be assessed dependent on Project Scope (DDT&E), Support Services and Acquisition Agreements. Approach: Model based structured against assessing organizations CM requirements including best practices maturity criteria. The model is tailored to the entity being assessed dependent on their CM system. The assessment approach provides objective feedback to Engineering and Project Management of the observed CM system maturity state versus the ideal state of the configuration management processes and outcomes(system). center dot Identifies strengths and risks versus audit gotcha's (findings/observations). center dot Used "recursively and iteratively" throughout program lifecycle at select points of need. (Typical assessments timing is Post PDR/Post CDR) center dot Ideal state criteria and maturity targets are reviewed with the assessed entity prior to an assessment (Tailoring) and is dependent on the assessed phase of the CM system. center dot Supports exit success criteria for Preliminary and Critical Design Reviews. center dot Gives a comprehensive CM system assessment which ultimately supports configuration verification activities.*
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sanderson, C.G.; Scarpitta, S.C.
1991-01-02
This report presents the results from the analysis of the 33rd set of environmental quality assessment samples (QAP 33) that were received on or before December 4, 1990. This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML's resultsmore » and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 3 days after the reporting deadline via a modem-telephone connection to the EML computer. The data for the different kinds of samples are given in the following units: air filters in Bq/filter; soil in Bq kg{sup {minus}1}; tissue in Bq kg{sup {minus}1}; vegetation in Bq kg{sup {minus}1}; and water in Bq L{sup {minus}1}. The values for elemental uranium are reported in {mu}g/filter, g, or mL. The EML value' listed in the tables to which the contractors' results are compared is the mean of replicate demonstrations for each nuclide. The EML uncertainty is the standard error of the mean. All other uncertainties are as reported by the participants.« less
10 CFR 851.22 - Hazard prevention and abatement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... controls that limit worker exposures; and (4) Personal protective equipment. (c) Contractors must address hazards when selecting or purchasing equipment, products, and services. ... the risk to workers; (ii) Implement interim protective measures pending final abatement; and (iii...
10 CFR 851.22 - Hazard prevention and abatement.
Code of Federal Regulations, 2011 CFR
2011-01-01
... controls that limit worker exposures; and (4) Personal protective equipment. (c) Contractors must address hazards when selecting or purchasing equipment, products, and services. ... the risk to workers; (ii) Implement interim protective measures pending final abatement; and (iii...
NASA Technical Reports Server (NTRS)
Thomas, LeAnn; Doreswamy, Rajiv N.
2008-01-01
Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent successes have been smaller, short-duration development projects using heritage hardware/software, focused technology development, technical oversight and stable external factors. (2) Programs and projects have failed or been terminated due to lack of technical insight, relaxing of SE&I processes, and unstable external factors. (3) The study did not find a single, clear optimum SE&I organization type to fit all projects. However, while any organizational structure can be made to work, the fewer complexities in the program, the better the likelihood of success. (4) The most common successful SE&I organization structure type in the study was type 4b, where the government maintained integration responsibility, with the prime contractor providing SE&I products and the government providing technical oversight. This study was instrumental in helping the APO select organization structure 4, following the same SE&I and oversight process used during humanlund7s last voyages to the Moon.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant... took appropriate steps to prevent any organizational conflict of interest in the selection process; or... process over which the entity exercised no control. (c) CONSTRUCTION—Nothing in this section 3009.570...
Choosing a Geothermal as an HVAC System.
ERIC Educational Resources Information Center
Lensenbigler, John D.
2002-01-01
Describes the process of selecting and installing geothermal water source heat pumps for new residence halls at Johnson Bible College in Knoxville, Tennessee, including choosing the type of geothermal design, contractors, and interior equipment, and cost and payback. (EV)
Estimating the potential safety benefits of intelligent transportation systems : working paper
DOT National Transportation Integrated Search
2000-01-01
Highway agencies and contractors now have a new tool for estimating the remaining service life of pavements and selecting the appropriate maintenance and rehabilitation activities?ground-penetrating radar (GPR). GPR systems collect pavement layer thi...
48 CFR 715.305 - Proposal evaluation.
Code of Federal Regulations, 2011 CFR
2011-10-01
....305 Section 715.305 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Source Selection 715.305 Proposal evaluation... Contractor Performance System to evaluate past performance. (Access to the system by USAID contracting office...
45 CFR 2543.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT...: (a) Basis for contractor selection; (b) Justification for lack of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...
Karra, Vijia K
2005-01-01
Mining injury surveillance data are used as the basis for assessing the severity of injuries among operator and contractor employees in the underground and surface mining of various minerals. Injury rates during 1983-2002 derived from Mine Safety and Health Administration (MSHA) database are analyzed using the negative binomial regression model. The logarithmic mean injury rate is expressed as a linear function of seven indicator variables representing Non-Coal Contractor, Metal Operator, Non Metal Operator, Stone Operator, Sand and Gravel Operator, Coal Contractor, and Work Location, and a continuous variable, RelYear, representing the relative year starting with 1983 as the base year. Based on the model, the mean injury rate declined at a 1.69% annual rate, and the mean injury rate for work on the surface is 52.53% lower compared to the rate for work in the underground. With reference to the Coal Operator mean injury rate: the Non-Coal Contractor rate is 30.34% lower, the Metal Operator rate is 27.18% lower, the Non-Metal Operator rate is 37.51% lower, the Stone Operator rate is 23.44% lower, the Sand and Gravel Operator rate is 16.45% lower, and the Coal Contractor rate is 1.41% lower. Fatality rates during the same 20 year period are analyzed similarly using Poisson regression model. Based on this model, the mean fatality rate declined at a 3.17% annual rate, and the rate for work on the surface is 64.3% lower compared to the rate for work in the underground. With reference to the Coal Operator mean fatality rate: the Non-Coal Contractor rate is 234.81% higher, the Metal Operator rate is 5.79% lower, the Non-Metal Operator rate is 47.36% lower, the Stone Operator rate is 8.29% higher, the Sand and Gravel Operator rate is 60.32% higher, and the Coal Contractor rate is 129.54% higher.
Crystal Growth of ZnSe and Related Ternary Compound Semiconductors by Physical Vapor Transport
NASA Technical Reports Server (NTRS)
Cushman, Paula P.
1997-01-01
Preliminary definition of all of the necessary materials, labor, services, and facilities necessary to provide science requirement definition, initiate hardware development activities, and provide an update flight program proposal consistent with the NRA selection letter. The major tasks identified in this SOW are in the general category of science requirements determination, instrument definition, and updated flight program proposal. The Contractor shall define preliminary management, technical and integration requirements for the program, including improved cost/schedule estimates. The Contractor shall identify new technology requirements, define experiment accommodations and operational requirements and negotiate procurement of any long lead items, if required, with the government.
Crystal Growth of ZnSe and Related Ternary Compound Semiconductors by Physical Vapor Transport
NASA Technical Reports Server (NTRS)
Su, Ching-Hua
1997-01-01
Preliminary definition of all of the necessary materials, labor, services, and facilities necessary to provide science requirement definition, initiate hardware development activities, and provide an updated flight program proposal consistent with the NRA selection letter. The major tasks identified in this SOW are in the general category of science requirements determination, instrument definition, and updated flight program proposal. The Contractor shall define preliminary management, technical and integration requirements for the program, including improved cost/schedule estimates. The Contractor shall identify new technology requirements, define experiment accommodations and operational requirements and negotiate procurement of any long lead items, if required, with the government.
Comprehensive national assessment of the sustainability of beef production
USDA-ARS?s Scientific Manuscript database
A national assessment is being conducted by the National Cattlemen’s Beef Association, a contractor to the beef checkoff, to develop better scientific understanding of the sustainability of beef. This includes a life cycle assessment (LCA) of greenhouse gas emissions along with other environmental, ...
Developing a Free-Piston Stirling Convertor for advanced radioisotope space power systems
NASA Astrophysics Data System (ADS)
Qiu, Songgang; Augenblick, John E.; White, Maurice A.; Peterson, Allen A.; Redinger, Darin L.; Petersen, Stephen L.
2002-01-01
The Department of Energy (DOE) has selected Free-Piston Stirling Convertors as a technology for future advanced radioisotope space power systems. In August 2000, DOE awarded competitive Phase I, Stirling Radioisotope Generator (SRG) power system integration contracts to three major aerospace contractors, resulting in SRG conceptual designs in February 2001. All three contractors based their designs on the Technology Demonstration Convertor (TDC) developed by Stirling Technology Company (STC) for DOE. The contract award to a single system integration contractor for Phases II and III of the SRG program is anticipated in late 2001. The first potential SRG mission is targeted for a Mars rover. This paper provides a description of the Flight Prototype (FP) Stirling convertor design as compared to the previous TDC design. The initial flight prototype units are already undergoing performance tuning at STC. The new design will be hermetically scaled and will provide a weight reduction from approximately 4.8 kg to approximately 3.9 kg. .
Thoughts on Earned Value Assessments
NASA Technical Reports Server (NTRS)
Pido, Kelle
2009-01-01
This slide presentation reviews the concepts of Earned Value reporting and Earned Value Metrics (EVM) and the implementation for the Constellation Program. EVM is used to manage both the contract and civil service workforce, and used as a measure of contractor costs and performance. The Program EVM is not as useful for Level of Effort tasking, for either contractor, or civil service employees. Some issues and concerns in reference to EVM and the process for the use of EVM for Mission assurance are reviewed,
Evaluation of the Texas tier system for seal coat binder specification.
DOT National Transportation Integrated Search
2012-09-01
The Texas Department of Transportation (TxDOT) instituted a change in their seal coat binder specification in 2010 which allowed districts to select multiple binders within specified traffic levels or tiers for the purposes of allowing contractors to...
APPLICATION OF RADON REDUCTION METHODS
The document is intended to aid homeowners and contractors in diagnosing and solving indoor radon problems. It will also be useful to State and Federal regulatory officials and many other persons who provide advice on the selection, design and operation of radon reduction methods...
Code of Federal Regulations, 2010 CFR
2010-10-01
... DEFENSE ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest... appropriate steps to prevent any organizational conflict of interest in the selection process; or (2) The... which the entity exercised no control. (c) In accordance with Section 802 of the National Defense...
International Cooperation in Acquisition, Technology and Logistics (IC in AT&L) Handbook
2012-05-01
Information exchanges, for instance, may lead to a cooperative RD&A project . Figure 1-1 illustrates this “ building block” concept of international...support the National Security Strategy, including the need to strengthen alliances and build partnerships. CWP projects are selected for their... projects : prime contractor (with international teaming of subcontractors), consortium and joint venture. The selection of the best industrial
James Webb Space Telescope: Supporting Multiple Ground System Transitions in One Year
NASA Technical Reports Server (NTRS)
Detter, Ryan; Fatig, Curtis; Steck, Jane
2004-01-01
Ideas, requirements, and concepts developed during the very early phases of the mission design often conflict with the reality of a situation once the prime contractors are awarded. This happened for the James Webb Space Telescope (JWST) as well. The high level requirement of a common real-time ground system for both the Integration and Test (I&T), as well as the Operation phase of the mission is meant to reduce the cost and time needed later in the mission development for re-certification of databases, command and control systems, scripts, display pages, etc. In the case of JWST, the early Phase A flight software development needed a real-time ground system and database prior to the spacecraft prime contractor being selected. To compound the situation, the very low level requirements for the real-time ground system were not well defined. These two situations caused the initial real-time ground system to be switched out for a system that was previously used by the Bight software development team. To meet the high-!evel requirement, a third ground system was selected based on the prime spacecraft contractor needs and JWST Project decisions. The JWST ground system team has responded to each of these changes successfully. The lessons learned from each transition have not only made each transition smoother, but have also resolved issues earlier in the mission development than what would normally occur.
About the use of vector optimization for company's contractors selection
NASA Astrophysics Data System (ADS)
Medvedeva, M. A.; Medvedev, M. A.
2017-07-01
For effective functioning of an enterprise it is necessary to make a right choice of partners: suppliers of raw material, buyers of finished products, and others with which the company interacts in the course of their business. However, the presence on the market of big amount of enterprises makes the choice of the most appropriate among them very difficult and requires the ability to objectively assess of the possible partners, based on multilateral analysis of their activities. This analysis can be carried out based on the solution of multiobjective problem of mathematical programming by using the methods of vector optimization. The present work addresses the theoretical foundations of such approach and also describes an algorithm realizing proposed method on practical example.
Results of a community-based survey of construction safety climate for Hispanic workers.
Marin, Luz S; Cifuentes, Manuel; Roelofs, Cora
2015-01-01
Hispanic construction workers experience high rates of occupational injury, likely influenced by individual, organizational, and social factors. To characterize the safety climate of Hispanic construction workers using worker, contractor, and supervisor perceptions of the workplace. We developed a 40-item interviewer-assisted survey with six safety climate dimensions and administered it in Spanish and English to construction workers, contractors, and supervisors. A safety climate model, comparing responses and assessing contributing factors was created based on survey responses. While contractors and construction supervisors' (n = 128) scores were higher, all respondents shared a negative perception of safety climate. Construction workers had statistically significantly lower safety climate scores compared to supervisors and contractors (30·6 vs 46·5%, P<0·05). Safety climate scores were not associated with English language ability or years lived in the United States. We found that Hispanic construction workers in this study experienced a poor safety climate. The Hispanic construction safety climate model we propose can serve as a framework to guide organizational safety interventions and evaluate safety climate improvements.
Results of a community-based survey of construction safety climate for Hispanic workers
Marin, Luz S; Cifuentes, Manuel; Roelofs, Cora
2015-01-01
Background: Hispanic construction workers experience high rates of occupational injury, likely influenced by individual, organizational, and social factors. Objectives: To characterize the safety climate of Hispanic construction workers using worker, contractor, and supervisor perceptions of the workplace. Methods: We developed a 40-item interviewer-assisted survey with six safety climate dimensions and administered it in Spanish and English to construction workers, contractors, and supervisors. A safety climate model, comparing responses and assessing contributing factors was created based on survey responses. Results: While contractors and construction supervisors’ (n = 128) scores were higher, all respondents shared a negative perception of safety climate. Construction workers had statistically significantly lower safety climate scores compared to supervisors and contractors (30.6 vs 46.5%, P<0.05). Safety climate scores were not associated with English language ability or years lived in the United States. Conclusions: We found that Hispanic construction workers in this study experienced a poor safety climate. The Hispanic construction safety climate model we propose can serve as a framework to guide organizational safety interventions and evaluate safety climate improvements. PMID:26145454
14 CFR 1274.507 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Procurement records. 1274.507 Section 1274.507 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH...) Basis for contractor selection. (b) Justification for lack of competition when competitive bids or...
48 CFR 731.109 - Advance agreements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Advance agreements. 731.109 Section 731.109 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT... agreements. Advance agreements on selected costs may be negotiated with USAID contractors by the Overhead and...
48 CFR 731.109 - Advance agreements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Advance agreements. 731.109 Section 731.109 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT... agreements. Advance agreements on selected costs may be negotiated with USAID contractors by the Overhead and...
48 CFR 731.109 - Advance agreements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Advance agreements. 731.109 Section 731.109 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT... agreements. Advance agreements on selected costs may be negotiated with USAID contractors by the Overhead and...
maintaining both types of cards. Common Access Card (CAC) "Smart" ID card for active-duty military personnel, Selected Reserve, DoD civilian employees, and eligible contractor personnel. CAC Types & and military retirees to access service benefits and privileges. ID Card Types & Eligibility
Balancing quality customer service with financial returns in privatized park services
Glen D. Alexander
1998-01-01
The privatization of public facilities continues to be an issue that impacts the bottom line of many public agencies. Choosing a concessionaire or contractor involves much more that selecting the highest bidder. Examining all the variables is a necessity.
28 CFR 70.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-07-01
... AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER NON... following at a minimum: (a) Basis for contractor selection, (b) Justification for lack of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...
78 FR 43863 - Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-22
... verifying that cleared contractors mitigate and ensuring identified security vulnerabilities. This public... information in ISFD. In turn, this will allow DSS to better tailor vulnerability assessments and other..., prior to annual vulnerability assessments, so that accurate information is continually maintained in...
Commercializing the transfer orbit stage
NASA Technical Reports Server (NTRS)
Miller, M. W.
1984-01-01
Key milestones necessary to establish the transfer orbit stage are examined. The selection of the project concept and synthesis of the company are described followed by an analysis venture capability support and the selection of a major aerospace company as prime contractor. A landmark agreement with NASA sanctioned the commercial TOS concept and provided the critical support necessary to raise the next round of venture capital. Project management and customer commitments are also discussed.
48 CFR 16.104 - Factors in selecting contract types.
Code of Federal Regulations, 2010 CFR
2010-10-01
... provide the bases for negotiating contract pricing arrangements. It is essential that the uncertainties... performance or length of production run. In times of economic uncertainty, contracts extending over a relatively long period may require economic price adjustment terms. (g) Contractor's technical capability and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... PRACTICES AND PERSONAL CONFLICTS OF INTEREST Voiding and Rescinding Contracts 3.701 Purpose. This subpart... final conviction for bribery, conflict of interest, disclosure or receipt of contractor bid or proposal information or source selection information in exchange for a thing of value or to give anyone a competitive...
Contracting for Asbestos Abatement: What You Need to Know.
ERIC Educational Resources Information Center
Bittle, Edgar H.; McAllister, Jane B.
1990-01-01
School districts are required to determine if asbestos-containing materials exist at school facilities and design and implement asbestos abatement. Reviews how to select a contractor, draft the contract, and ensure its proper implementation by complying with the law and avoiding liability. (MLF)
78 FR 22512 - Proposed Information Collection; Comment Request; Special Priorities Assistance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-16
... from defense contractors and suppliers on Form BIS-999, Request for Special Priorities Assistance, is required for the enforcement and administration of special priorities assistance under the Defense Production Act, the Selective Service Act and the Defense Priorities and Allocation System regulation...
78 FR 8113 - Agency Information Collection Activities: Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-05
... to collect information as part of quantitative research related to residential mortgage loan... is the subject of the disclosure. The quantitative research will involve testing the mortgage loan... quantitative research methodologies. The contractors will select participants via screening questionnaires to...
7 CFR 226.22 - Procurement standards.
Code of Federal Regulations, 2010 CFR
2010-01-01
... pertinent to the following: rationale for the method of procurement, selection of contract type, contractor... competition. The description may include a statement of the qualitative nature of the material, product or... technical resources. (i) Program procurements shall be made by one of the following methods: (1) Small...
Administering Safety: Challenge Courses and Climbing Walls.
ERIC Educational Resources Information Center
Evans, Will
1996-01-01
A camp that is establishing a challenge course or climbing wall must ensure program safety. Discusses financial planning, selecting a contractor, adhering to standards for construction, inspections, staff training, screening of participants, and the administrative challenge of implementing and documenting proper actions. Sidebar discusses a study…
48 CFR 35.009 - Subcontracting research and development effort.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.009 Subcontracting research and development effort. Since the selection of R&D contractors is substantially based on... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Subcontracting research...
Joint-operation in water resources project in Indonesia: Integrated or non-integrated
NASA Astrophysics Data System (ADS)
Ophiyandri, Taufika; Istijono, Bambang; Hidayat, Benny
2017-11-01
The construction of large water resources infrastructure project often involved a joint-operation (JO) project between two or more construction companies. The form of JO can be grouped into two categories - an integrated type and a non-integrated type. This paper investigates the reason of forming a JO project made by companies. The specific advantages and problems of JO project is also analysed in this paper. In order to achieve the objectives, three water resources infrastructure projects were selected as case studies. Data was gathered by conducting 11 semi-structured interviews to project owners, contractor managers, and project staffs. Data was analysed by means of content analysis. It was found that the most fundamental factor to form a JO is to win a competition or tender. An integrated model is in favour because it can reduce overhead costs and has a simple management system, while a non-integrated model is selected because it can avoid a sleeping partner and make contractor more responsible for their own job.
DOT National Transportation Integrated Search
1988-01-01
This report presents an assessment of the accuracy of alternatives available to calculate unabsorbed overhead in construction delay claims submitted by contractors. It reviews the alternatives available, concludes that the Eichleay method, used by ma...
2012-11-26
Minutes Required 116 64 142 58 380 No. of Contractor Meeting Minutes Available Preparatory Meetings Initial Meetings 0 0 18 15 0 0 20 2 38...work, for which the contractors should have prepared a total of 190 preparatory and 190 initial meeting minutes (total of 380 meeting minutes...27, 2012 DoD IG Report No. D-2010-059, “Contingency Contracting: A Framework for Reform,” May 14, 2010 DoD IG Report No. SPO -2009-005, “Assessment
Lessons Learned from a Tryout of Spanish and English Versions of a State Assessment.
ERIC Educational Resources Information Center
Stansfield, Charles W.; Kahl, Stuart R.
The Massachusetts Comprehensive Assessment System (MCAS) is the new Massachusetts state assessment program that is being implemented in response to state education reform legislation. The paper describes the early efforts of the state Department of Education (MDOE), its prime contractor for development of the MCAS (Advanced Systems in Measurement…
Measure Guideline: Heat Pump Water Heaters in New and Existing Homes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shapiro, C.; Puttagunta, S.; Owens, D.
2012-02-01
This Building America Measure Guideline is intended for builders, contractors, homeowners, and policy-makers. This document is intended to explore the issues surrounding heat pump water heaters (HPWHs) to ensure that homeowners and contractors have the tools needed to appropriately and efficiently install HPWHs. Heat pump water heaters (HPWHs) promise to significantly reduce energy consumption for domestic hot water (DHW) over standard electric resistance water heaters (ERWHs). While ERWHs perform with energy factors (EFs) around 0.9, new HPWHs boast EFs upwards of 2.0. High energy factors in HPWHs are achieved by combining a vapor compression system, which extracts heat from themore » surrounding air at high efficiencies, with electric resistance element(s), which are better suited to meet large hot water demands. Swapping ERWHs with HPWHs could result in roughly 50% reduction in water heating energy consumption for 35.6% of all U.S. households. This Building America Measure Guideline is intended for builders, contractors, homeowners, and policy-makers. While HPWHs promise to significantly reduce energy use for DHW, proper installation, selection, and maintenance of HPWHs is required to ensure high operating efficiency and reliability. This document is intended to explore the issues surrounding HPWHs to ensure that homeowners and contractors have the tools needed to appropriately and efficiently install HPWHs. Section 1 of this guideline provides a brief description of HPWHs and their operation. Section 2 highlights the cost and energy savings of HPWHs as well as the variables that affect HPWH performance, reliability, and efficiency. Section 3 gives guidelines for proper installation and maintenance of HPWHs, selection criteria for locating HPWHs, and highlights of important differences between ERWH and HPWH installations. Throughout this document, CARB has included results from the evaluation of 14 heat pump water heaters (including three recently released HPWH products) installed in existing homes in the northeast region of the United States.« less
NASA Technical Reports Server (NTRS)
1989-01-01
This document establishes electrical, electronic, and electromechanical (EEE) parts management and control requirements for contractors providing and maintaining space flight and mission-essential or critical ground support equipment for NASA space flight programs. Although the text is worded 'the contractor shall,' the requirements are also to be used by NASA Headquarters and field installations for developing program/project parts management and control requirements for in-house and contracted efforts. This document places increased emphasis on parts programs to ensure that reliability and quality are considered through adequate consideration of the selection, control, and application of parts. It is the intent of this document to identify disciplines that can be implemented to obtain reliable parts which meet mission needs. The parts management and control requirements described in this document are to be selectively applied, based on equipment class and mission needs. Individual equipment needs should be evaluated to determine the extent to which each requirement should be implemented on a procurement. Utilization of this document does not preclude the usage of other documents. The entire process of developing and implementing requirements is referred to as 'tailoring' the program for a specific project. Some factors that should be considered in this tailoring process include program phase, equipment category and criticality, equipment complexity, and mission requirements. Parts management and control requirements advocated by this document directly support the concept of 'reliability by design' and are an integral part of system reliability and maintainability. Achieving the required availability and mission success objectives during operation depends on the attention given reliability and maintainability in the design phase. Consequently, it is intended that the requirements described in this document are consistent with those of NASA publications, 'Reliability Program Requirements for Aeronautical and Space System Contractors,' NHB 5300.4(1A-l); 'Maintainability Program Requirements for Space Systems,' NHB 5300.4(1E); and 'Quality Program Provisions for Aeronautical and Space System Contractors,' NHB 5300.4(1B).
24 CFR 891.535 - Requirements for awarding construction contracts.
Code of Federal Regulations, 2010 CFR
2010-04-01
... bidding (formal advertising) in selecting a construction contractor or the negotiated noncompetitive... be an opportunity for minority owned and women owned businesses to be awarded a contract. (1) Bids... forth for opening of bids. In addition, the invitation shall be publicly advertised. (2) The invitation...
24 CFR 891.535 - Requirements for awarding construction contracts.
Code of Federal Regulations, 2011 CFR
2011-04-01
... bidding (formal advertising) in selecting a construction contractor or the negotiated noncompetitive... be an opportunity for minority owned and women owned businesses to be awarded a contract. (1) Bids... forth for opening of bids. In addition, the invitation shall be publicly advertised. (2) The invitation...
10 CFR 71.115 - Control of purchased material, equipment, and services.
Code of Federal Regulations, 2010 CFR
2010-01-01
... RADIOACTIVE MATERIAL Quality Assurance § 71.115 Control of purchased material, equipment, and services. (a... source evaluation and selection, objective evidence of quality furnished by the contractor or... available, this documentary evidence for the life of the package to which it applies. The licensee...
10 CFR 71.115 - Control of purchased material, equipment, and services.
Code of Federal Regulations, 2014 CFR
2014-01-01
... RADIOACTIVE MATERIAL Quality Assurance § 71.115 Control of purchased material, equipment, and services. (a... source evaluation and selection, objective evidence of quality furnished by the contractor or... available, this documentary evidence for the life of the package to which it applies. The licensee...
10 CFR 71.115 - Control of purchased material, equipment, and services.
Code of Federal Regulations, 2011 CFR
2011-01-01
... RADIOACTIVE MATERIAL Quality Assurance § 71.115 Control of purchased material, equipment, and services. (a... source evaluation and selection, objective evidence of quality furnished by the contractor or... available, this documentary evidence for the life of the package to which it applies. The licensee...
10 CFR 71.115 - Control of purchased material, equipment, and services.
Code of Federal Regulations, 2013 CFR
2013-01-01
... RADIOACTIVE MATERIAL Quality Assurance § 71.115 Control of purchased material, equipment, and services. (a... source evaluation and selection, objective evidence of quality furnished by the contractor or... available, this documentary evidence for the life of the package to which it applies. The licensee...
10 CFR 71.115 - Control of purchased material, equipment, and services.
Code of Federal Regulations, 2012 CFR
2012-01-01
... RADIOACTIVE MATERIAL Quality Assurance § 71.115 Control of purchased material, equipment, and services. (a... source evaluation and selection, objective evidence of quality furnished by the contractor or... available, this documentary evidence for the life of the package to which it applies. The licensee...
Code of Federal Regulations, 2010 CFR
2010-10-01
... factors in the selection decision. (iii) Orders exceeding $5 million. For task or delivery orders in... procedures in 5.705. (11) When using the Governmentwide commercial purchase card as a method of payment, orders at or below the micro-purchase threshold are exempt from verification in the Central Contractor...
Training Issues Associated with COTS-based Information Intensive Systems.
ERIC Educational Resources Information Center
Farr, John V.; Verma, Dinesh
2002-01-01
A literature review and survey responses from 194 information technology and aerospace contractors identified methods and outcomes of training delivery. Results were used to develop a framework for evaluating and selecting commercial off-the-shelf systems (COTS) for operations and maintenance training. (Contains 11 references.) (SK)
48 CFR 42.502 - Selecting contracts for postaward orientation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the product or service to critical programs; (f) Length of the planned production cycle; (g) Extent of... status, if any, as a small business, small disadvantaged, women-owned, veteran-owned, HUBZone, or service-disabled veteran-owned small business concern; (j) Contractor's performance history with small, small...
Consumer's Guide to Radon Reduction: How to Fix Your Home
Radon is the leading cause of lung cancer for non-smokers and the second leading cause of lung cancer for the general population. Learn more about testing your home for radon, and how to select a contractor if you have high levels of radon present.
28 CFR 35.130 - General prohibitions against discrimination.
Code of Federal Regulations, 2010 CFR
2010-07-01
... disabilities. (5) A public entity, in the selection of procurement contractors, may not use criteria that..., directly or through contractual or other arrangements, utilize criteria or methods of administration: (i... determining the site or location of a facility, make selections— (i) That have the effect of excluding...
48 CFR 1352.237-72 - Security processing requirements-national security contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... National Security Contracts require contractor employees to gain access to national security information in.... (c) Security Procedures. Position sensitivity/risk assessments must be conducted on all functions... same manner as assessment of those functions performed by government employees. The Contracting Officer...
48 CFR 1352.237-72 - Security processing requirements-national security contracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
.... National Security Contracts require contractor employees to gain access to national security information in.... (c) Security procedures. Position sensitivity/risk assessments must be conducted on all functions... same manner as assessment of those functions performed by government employees. The Contracting Officer...
48 CFR 1352.237-72 - Security processing requirements-national security contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
.... National Security Contracts require contractor employees to gain access to national security information in.... (c) Security procedures. Position sensitivity/risk assessments must be conducted on all functions... same manner as assessment of those functions performed by government employees. The Contracting Officer...
48 CFR 1352.237-72 - Security processing requirements-national security contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... National Security Contracts require contractor employees to gain access to national security information in.... (c) Security Procedures. Position sensitivity/risk assessments must be conducted on all functions... same manner as assessment of those functions performed by government employees. The Contracting Officer...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Waite, J.L.
1996-04-12
This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impactmore » to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hobbs, R.E.
In large facilities, successful energy management cannot be measured by a few projects, no matter how significant the energy savings. Large facilities today are comprised of extensive energy consuming systems. For every energy project developed, two more projects remain to be discovered. The successful energy manager is one who has completed ten projects, or twenty, or thirty, and is still finding more projects to do. Nothing is assumed to be as efficient as possible, and no part of any system is ignored. The successful energy manager is willing to take risks, not of being fired, but to use imagination, studymore » engineering theory, exercise common sense, develop concept designs, calculate savings, sell projects to management, control designers, study equipment performance, pre-select contractors, manage the contractor efforts, solve inherent problems along the way, and then optimize the project after acceptance when the designers and contractors all walk off. Once the successful energy manager establishes his credibility, his problem becomes finding enough time to get the projects rolling as he dreams them up. He sees what others do not. As they say in the North, only the lead dog sees new scenery.« less
Independent verification of plutonium decontamination on Johnston Atoll (1992--1996)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson-Nichols, M.J.; Wilson, J.E.; McDowell-Boyer, L.M.
1998-05-01
The Field Command, Defense Special Weapons Agency (FCDSWA) (formerly FCDNA) contracted Oak Ridge National Laboratory (ORNL) Environmental Technology Section (ETS) to conduct an independent verification (IV) of the Johnston Atoll (JA) Plutonium Decontamination Project by an interagency agreement with the US Department of Energy in 1992. The main island is contaminated with the transuranic elements plutonium and americium, and soil decontamination activities have been ongoing since 1984. FCDSWA has selected a remedy that employs a system of sorting contaminated particles from the coral/soil matrix, allowing uncontaminated soil to be reused. The objective of IV is to evaluate the effectiveness ofmore » remedial action. The IV contractor`s task is to determine whether the remedial action contractor has effectively reduced contamination to levels within established criteria and whether the supporting documentation describing the remedial action is adequate. ORNL conducted four interrelated tasks from 1992 through 1996 to accomplish the IV mission. This document is a compilation and summary of those activities, in addition to a comprehensive review of the history of the project.« less
Application of the HARDMAN methodology to the single channel ground-airborne radio system (SINCGARS)
NASA Astrophysics Data System (ADS)
Balcom, J.; Park, J.; Toomer, L.; Feng, T.
1984-12-01
The HARDMAN methodology is designed to assess the human resource requirements early in the weapon system acquisition process. In this case, the methodology was applied to the family of radios known as SINCGARS (Single Channel Ground-Airborne Radio System). At the time of the study, SINCGARS was approaching the Full-Scale Development phase, with 2 contractors in competition. Their proposed systems were compared with a composite baseline comparison (reference) system. The systems' manpower, personnel and training requirements were compared. Based on RAM data, the contractors' MPT figures showed a significant reduction from the figures derived for the baseline comparison system. Differences between the two contractors were relatively small. Impact and some tradeoff analyses were hindered by data access problems. Tactical radios, manpower and personnel requirements analysis, impact and tradeoff analysis, human resource sensitivity, training requirements analysis, human resources in LCSMM, and logistics analyses are discussed.
48 CFR 1509.170-8 - Contractor Performance Report.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...
48 CFR 1816.405-270 - CPAF contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... exceptional situations such as contract requirements having direct health or safety impacts, where the judgmental assessment of the quality of contractor performance is critical. (c) Except as provided in...
48 CFR 1816.405-270 - CPAF contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... exceptional situations such as contract requirements having direct health or safety impacts, where the judgmental assessment of the quality of contractor performance is critical. (c) Except as provided in...
48 CFR 1816.405-270 - CPAF contracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... exceptional situations such as contract requirements having direct health or safety impacts, where the judgmental assessment of the quality of contractor performance is critical. (c) Except as provided in...
Industry perspectives on Plug-& -Play Spacecraft Avionics
NASA Astrophysics Data System (ADS)
Franck, R.; Graven, P.; Liptak, L.
This paper describes the methodologies and findings from an industry survey of awareness and utility of Spacecraft Plug-& -Play Avionics (SPA). The survey was conducted via interviews, in-person and teleconference, with spacecraft prime contractors and suppliers. It focuses primarily on AFRL's SPA technology development activities but also explores the broader applicability and utility of Plug-& -Play (PnP) architectures for spacecraft. Interviews include large and small suppliers as well as large and small spacecraft prime contractors. Through these “ product marketing” interviews, awareness and attitudes can be assessed, key technical and market barriers can be identified, and opportunities for improvement can be uncovered. Although this effort focuses on a high-level assessment, similar processes can be used to develop business cases and economic models which may be necessary to support investment decisions.
48 CFR 47.207-5 - Contractor responsibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be... furnished by the contractor. Otherwise, state that the contractor shall furnish clean and sound closed-type...
7 CFR 1788.12 - Contractors' bonds.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 12 2010-01-01 2010-01-01 false Contractors' bonds. 1788.12 Section 1788.12... Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...
48 CFR 15.408 - Solicitation provisions and contract clauses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... officer determines that the prospective contractor has demonstrated that its functions provide added value.... If a less economical “make” or “buy” categorization is selected for one or more items of significant value, the contracting officer shall use the clause with— (1) Its Alternate I, if a fixed-price...
48 CFR 15.408 - Solicitation provisions and contract clauses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... officer determines that the prospective contractor has demonstrated that its functions provide added value.... If a less economical “make” or “buy” categorization is selected for one or more items of significant value, the contracting officer shall use the clause with— (1) Its Alternate I, if a fixed-price...
48 CFR 873.110 - Solicitation provisions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... DEPARTMENT SUPPLEMENTARY REGULATIONS SIMPLIFIED ACQUISITION PROCEDURES FOR HEALTH-CARE RESOURCES 873.110... information, as described in 873.112, is to be used to select a contractor under an RFQ or RFP for health-care... officer may insert the provision at 852.273-73, Evaluation—health-care resources, in the RFQ or RFP in...
48 CFR 873.110 - Solicitation provisions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... DEPARTMENT SUPPLEMENTARY REGULATIONS SIMPLIFIED ACQUISITION PROCEDURES FOR HEALTH-CARE RESOURCES 873.110... information, as described in 873.112, is to be used to select a contractor under an RFQ or RFP for health-care... officer may insert the provision at 852.273-73, Evaluation—health-care resources, in the RFQ or RFP in...
Chronology of a Successful Conversion--Contractor Revives School Lunch Program.
ERIC Educational Resources Information Center
Johnston, James B.
1994-01-01
A New York State school district employed a management company to privatize the food-service program with the goal of enticing all students to eat lunch. Expertise in marketing, menu planning, and food-service operation turned the program around. Suggests questions to ask when selecting a management company. (MLF)
Laundry Facility Considerations: Tips on an Often Overlooked Student Housing Issue.
ERIC Educational Resources Information Center
Reynolds, Rick
1991-01-01
Administrators making long-term decisions on campus laundry equipment and service need to consider self-ownership versus contracting. Considerations in selecting a contractor include the contract, accountability, repair services, and machine usage pricing. Laundry rooms should not be located where they pose security problems and should be arranged…
78 FR 21632 - Investigative Hearing
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-11
... goals of this hearing will be to gather additional information on the selection of the lithium ion (Li- ion) battery technology and how this new technology was evaluated, the role of the prime contractor... structure and findings of compliance for the Boeing 787 Li-ion battery system. Parties to the hearing...
This presentation will describe a series of field demonstrations of innovative leak detection/location and condition assessment technologies that was sponsored by the U.S. Environmental Protection Agency (EPA), conducted by EPA’s contractor (Battelle), and hosted by the Louisvil...
This presentation will describe a series of field demonstrations of innovative leak detection/location and condition assessment technologies that was sponsored by the U.S. Environmental Protection Agency (EPA), conducted by EPA’s contractor (Battelle), and hosted by the Louisvill...
48 CFR 1845.502-70 - Contractor-acquired property.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor-acquired... Possession of Contractors 1845.502-70 Contractor-acquired property. All contractor-acquired property must be... contractor-acquired. (2) Submission of DD Form 1419, DOD Industrial Plant Requisition, or equivalent format...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hamel, D.R.
This paper identifies the kinds of risk assessments being done by or for the US Department of Agriculture (USDA) Forest Service. Summaries of data sources currently in use and the pesticide risk assessments completed by the agency or its contractors are discussed. An overview is provided of the agency`s standard operating procedures for the conduct of toxicological, ecological, environmental fate, and human health risk assessments.
48 CFR 42.708 - Quick-closeout procedure.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 42.708 Quick-closeout procedure. (a... waive the 15 percent restriction based upon a risk assessment that considers the contractor's accounting...
48 CFR 18.102 - Central contractor registration.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Central contractor... Central contractor registration. Contractors are not required to be registered in the Central Contractor.... (See 4.1102). However, contractors are required to register with CCR in order to gain access to the...
48 CFR 2427.305-2 - Follow-up by contractor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Follow-up by contractor....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to the... Contracting Officer shall send the form to those contractors whose contract work may have required the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-20
... Contractor Registration AGENCY: Department of Defense (DoD), General Services Administration (GSA), and... changes the clauses requiring contractor registration in the Central Contractor Registration (CCR... unique identifier for contractors. It is used (1) to uniquely identify a contractor entity, and (2) to...
The NGST Yardstick Integrated Science Instrument Module (ISIM) Feasibility Study
NASA Astrophysics Data System (ADS)
Greenhouse, M. A.; NGST ISIM Team
1999-05-01
The Next Generation Space Telescope (NGST) Integrated Science Instrument Module (ISIM) is a distributed system consisting of a cryogenic instrument module that is integrated with the Optical Telescope Assembly (OTA) and science processors, software, and other electronics located in the Space Support Module (SSM). The ISIM system provides structure, environment, and data handling for several modular science instruments as well as several components of the OTA optics train. An ISIM baseline design and feasibility study is ongoing at GSFC. This pre-Phase A design was developed for integration with the Yardstick NGST architecture and packaging in a 5 m class EELV fairing. The goals of this study are to: [1] demonstrate mission science feasibility, [2] assess ISIM engineering and cost feasibility, [3] identify ISIM technology challenge areas,and [4] enable smart customer procurement of the NGST. In depth results from this work beyond those displayed here can be found at: http://www701.gsfc.nasa.gov/isim/isim.htm The flight ISIM will be developed by a GSFC led IPT that includes members from the STScI and, during Phase A/B, will grow to include the NGST Prime Contractor, and science instrument development teams from European, Canadian , and US science communities. Science instruments will be competitively procured from the science community, and will be integrated into the ISIM by GSFC. The flight qualified ISIM will then be delivered by GSFC to the NGST Prime Contractor for observatory level integration. At the start of NGST Phase A (Spring 1999), two competing prime contractors will begin development of separate NGST architectures, and the ISIM IPT will develop two ISIM designs corresponding to these architectures. Down selection to a single design will occur during mid 2001. The ISIM team welcomes science community feedback. Contact the IPT lead: Matt Greenhouse: matt@stars.gsfc.nasa.gov.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Contractors. 401.90 Section 401.90 Employees... Privacy Act § 401.90 Contractors. (a) All contracts which require a contractor to maintain, or on behalf... requiring the contractor to comply with the Privacy Act and this part. (b) A contractor and any employee of...
Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan
NASA Astrophysics Data System (ADS)
Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh
2017-10-01
Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-5 Policy. (a) Contracting officers are responsible for the timely completion of contractors' performance evaluations. The National Institutes of Health Contractor Performance System shall be used to record individual contractor performance histories...
7 CFR 1788.12 - Contractors' bonds.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...
7 CFR 1788.12 - Contractors' bonds.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...
7 CFR 1788.12 - Contractors' bonds.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...
7 CFR 1788.12 - Contractors' bonds.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...
Code of Federal Regulations, 2011 CFR
2011-10-01
... CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-5 Policy. (a) Contracting officers are responsible for the timely completion of contractors' performance evaluations. The National Institutes of Health Contractor Performance System shall be used to record individual contractor performance histories...
Assessment of Electrical Safety in Afghanistan
2009-07-24
effectiveness of command efforts to ensure the electrical safety of Department of Defense occupied and constructed facilities in Afghanistan. We...March 31, 2009, we announced the Assessment of Electrical Safety in Afghanistan. The objective of this assessment was to review the effectiveness of...used contractors to review and identify electrical deficiencies to include life, health , and safety issues at FOBs. According to TF POWER
IMPLEMENTATION OF DEFENSE NUCLEAR FACILITY SAFETY BOARD RECOMMENDATION 2000-2 AT WIPP
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jackson, K.; Wu, C.
2002-02-26
The Defense Nuclear Safeties Board (DNFSB) issued Recommendation 2000-2 on March 8, 2000, concerning the degrading conditions of vital safety systems, or systems important to nuclear safety, at DOE sites across the nation. The Board recommended that the DOE take action to assess the condition of its nuclear systems to ensure continued operational readiness of vital safety systems that are important for safely accomplishing the DOE's mission. To verify the readiness of vital safety systems, a two-phased approach was established. Phase I consisted of a qualitative assessment to approved criteria of the defined vital safety systems by operating contractor personnel,more » overseen by Federal field office personnel. Based on Phase I Assessment results, vital safety systems with significant deficiencies would be further assessed in Phase II, a more extensive quantitative assessment, by a contractor and Federal team, using a second set of criteria. In addition, Defense Nuclear Facility Safety Board Recommendation 2000-2 concluded that the degradation of confinement ventilation systems was of major concern, and issued a separate set of criteria to perform a Phase II Assessment on confinement ventilation systems.« less
28 CFR 0.71 - Delegation respecting immunity matters.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Government from State or local taxation (except actions to set aside ad valorem taxes, assessments, special... as State or local taxation involving contractors performing contracts for or on behalf of the United...
Kim, Seung-Sup; Dutra, Lauren M; Okechukwu, Cassandra A
2014-07-01
This paper sought to assess organizational safety practices at three different levels of hierarchical workplace structure and to examine their association with injury outcomes among construction apprentices. Using a cross-sectional sample of 1,775 construction apprentices, three measures of organizational safety practice were assessed: contractor-, steward-, and coworker-safety practice. Each safety practice measure was assessed using three similar questions (i.e., on-the-job safety commitment, following required or recommended safe work practices, and correcting unsafe work practices); the summed average of the responses ranged from 1 to 4, with a higher score indicating poorer safety practice. Outcome variables included the prevalence of four types of musculoskeletal pain (i.e., neck, shoulder, hand, and back pain) and injury-related absence. In adjusted analyses, contractor-safety practice was associated with both hand pain (OR: 1.27, 95 % CI: 1.04, 1.54) and back pain (OR: 1.40, 95 % CI: 1.17, 1.68); coworker-safety practice was related to back pain (OR: 1.42, 95 % CI: 1.18, 1.71) and injury-related absence (OR: 1.36, 95 % CI: 1.11, 1.67). In an analysis that included all three safety practice measures simultaneously, the association between coworker-safety practice and injury-related absence remained significant (OR: 1.68, 95 % CI: 1.20, 2.37), whereas all other associations became non-significant. This study suggests that organizational safety practice, particularly coworker-safety practice, is associated with injury outcomes among construction apprentices.
Environmental management assessment of the National Institute for Petroleum and Energy Research
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-08-01
This report documents the results of the environmental management assessment of the National Institute for Petroleum and Energy Research (NIPER), located in Bartlesville, Oklahoma. The assessment was conducted August 15-26, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health. The assessment included reviews of documents and reports, as well as inspections and observations of selected facilities and operations. Further, the team conducted interviews with management and staff from the Bartlesville Project Office (BPO), the Office of Fossil Energy (FE), the Pittsburgh Energy Technology Center (PETC), state and local regulatory agencies, andmore » BDM Oklahoma (BDM-OK), which is the management and operating (M&O) contractor for NIPER. Because of the transition from a cooperative agreement to an M&O contract in January 1994, the scope of the assessment was to evaluate (1) the effectiveness of BDM-OK management systems being developed and BPO systems in place and under development to address environmental requirements; (2) the status of compliance with DOE Orders, guidance, and directives; and (3) conformance with accepted industry management practices. An environmental management assessment was deemed appropriate at this time in order to identify any systems modifications that would provide enhanced effectiveness of the management systems currently under development.« less
Outsourcing Cataloging, Authority Work, and Physical Processing: A Checklist of Considerations.
ERIC Educational Resources Information Center
Kascus, Marie A., Ed.; Hale, Dawn, Ed.
Due to automation technology, financial restrictions, and resultant downsizing, library managers have increasingly relied on the services of contractors, rather than in-house staff, to accomplish different technical services operations. Contracted services may range from a small project for a selected group of materials to a large project for…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-11
... forwarded to the Office of Management and Budget (OMB) for review and approval. The nature of the... qualified vessels in the Maritime Security Program Fleet. Applications and amendments are used to select vessels for the fleet. Periodic reporting is used to monitor adherence of contractors to program...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-03
... forwarded to the Office of Management and Budget (OMB) for review and approval. The nature of the... qualified vessels in the Maritime Security Program Fleet. Applications and amendments are used to select vessels for the fleet. Periodic reporting is used to monitor adherence of contractors to program...
48 CFR 9.505-2 - Preparing specifications or work statements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... or work statements. 9.505-2 Section 9.505-2 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-2 Preparing specifications or work statements. (a)(1) If a contractor prepares and.... (3) In development work, it is normal to select firms that have done the most advanced work in the...
The Metamorphosis of a Football Stadium.
ERIC Educational Resources Information Center
van der Have, Pieter J.
1999-01-01
Examines the planning, renovation and enlargement, and funding of a new University of Utah football stadium that would also be used in the 2002 Winter Olympics. Contractor selection, solutions to construction challenges, and the steps taken to minimize risk and guarantee success of the projects are discussed, including the fact that the stadium is…
Technoeconomic analysis of conventional logging systems operating from stump to landing
Raymond L. Sarles; William G. Luppold; William G. Luppold
1986-01-01
Analyzes technical and economic factors for six conventional logging systems suitable for operation in eastern forests. Discusses financial risks and business implications for loggers investing in high-production, state-of-the-art logging systems. Provides logging contractors with information useful as a preliminary guide for selection of equipment and systems....
The Skills Enhancement Training Program. Performance Report.
ERIC Educational Resources Information Center
Food and Beverage Workers Union, Local 32, Washington, DC.
This report describes a joint labor-management workplace literacy program called SET (Skills Enhancement Training) that targeted the more than 2,000 unionized employees of food service contractors at U.S. government institutions in Washington, D.C. Nineteen classes were offered and a total of 191 people self-selected themselves into the program.…
48 CFR 9.505-2 - Preparing specifications or work statements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... or work statements. 9.505-2 Section 9.505-2 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-2 Preparing specifications or work statements. (a)(1) If a contractor prepares and.... (3) In development work, it is normal to select firms that have done the most advanced work in the...
But I'm an engineer—not a contracts lawyer!
NASA Astrophysics Data System (ADS)
Warner, Mark; Bass, Harvey
2012-09-01
Industrial partners, commercial vendors, and subsystem contractors play a large role in the design and construction of modern telescopes. Because many telescope projects carry relatively small staffs, engineers are often required to perform the additional functions of technical writing, cost estimating, and contract bidding and negotiating. The skills required to carry out these tasks are not normally taught in traditional engineering programs. As a result, engineers often learn to write Request for Proposals (RFPs), select vendors, and negotiate contracts by trial-and-error and/or by adapting previous project documents to match their own requirements. Typically, this means that at the end of a contract the engineer has a large list of do's, don'ts, and lessons learned for the next RFP he or she must generate. This paper will present one such engineer's experience writing and bidding proposal packages for large telescope components and subsystems. Included are: thoughts on structuring SOWs, Specs, ICDs, and other RFP documents; modern methods for bidding the work; and systematic means for selecting and negotiating with a contractor to arrive at the best value for the project.
76 FR 39015 - Contractor Performance Information
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-05
...] Contractor Performance Information AGENCY: Environmental Protection Agency (EPA), ACTION: Direct final rule... contractor performance information. EPA is issuing a final rule because the changes are procedural in nature... Institutes of Health's Contractor Performance System (CPS) to the Department of Defense's Contractor...
48 CFR 3009.171-8 - Ineligible contractors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Ineligible contractors..., HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 3009.171-8 Ineligible contractors. Any business concern determined to be ineligible...
Evolved Expendable Launch Vehicle (EELV)
2015-12-15
FY13+ Phase I Buy Contractor: United Launch Services, LLC Contractor Location: 9501 East Panorama Circle Centennial , CO 80112 Contract Number...Contract Name: FY13+ Phase I Buy Contractor: United Launch Services, LLC Contractor Location: 9501 East Panorama Circle Centennial , CO 80112 Contract...FY12 EELV Launch Services (ELS5) Contractor: United Launch Services, LLC. Contractor Location: 9501 East Panorama Circle Centennial , CO 80112
Code of Federal Regulations, 2011 CFR
2011-10-01
... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.602 General. (a) Contractor team arrangements may be..., cost, and delivery for the system or product being acquired. (b) Contractor team arrangements may be... acquisitions, including production. (c) The companies involved normally form a contractor team arrangement...
Code of Federal Regulations, 2013 CFR
2013-10-01
... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.602 General. (a) Contractor team arrangements may be..., cost, and delivery for the system or product being acquired. (b) Contractor team arrangements may be... acquisitions, including production. (c) The companies involved normally form a contractor team arrangement...
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.602 General. (a) Contractor team arrangements may be..., cost, and delivery for the system or product being acquired. (b) Contractor team arrangements may be... acquisitions, including production. (c) The companies involved normally form a contractor team arrangement...
Code of Federal Regulations, 2012 CFR
2012-10-01
... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.602 General. (a) Contractor team arrangements may be..., cost, and delivery for the system or product being acquired. (b) Contractor team arrangements may be... acquisitions, including production. (c) The companies involved normally form a contractor team arrangement...
Code of Federal Regulations, 2014 CFR
2014-10-01
... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.602 General. (a) Contractor team arrangements may be..., cost, and delivery for the system or product being acquired. (b) Contractor team arrangements may be... acquisitions, including production. (c) The companies involved normally form a contractor team arrangement...
48 CFR 51.104 - Furnishing assistance to contractors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contractors. 51.104 Section 51.104 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 51.104 Furnishing assistance to contractors. After receiving an activity address code, the contracting...
48 CFR 752.7013 - Contractor-mission relationships.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor-mission....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas.... Contractor-Mission Relationships (OCT 1989) (a) The Contractor acknowledges that this contract is an...
48 CFR 46.105 - Contractor responsibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is..., and furnishing such information to the Government as required. (b) The contractor may be required to...
Chronology of KSC and KSC related events, 1982
NASA Technical Reports Server (NTRS)
Nail, K., Jr.
1984-01-01
The history of activities at the Kennedy Space Center in 1982 is presented as reflected in NASA News Releases and selected periodicals. Items are arranged in chronological order by date of the published sources. Actual data date of the event may be indicated in parenthesis when the article itself does not make that information explicit. Highlights of the year's activities include three launchings of the orbiter Columbia; successful launches of communications satellites using expendable vehicles; major changes in contracting; and the selection of a base operations contractor.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-12
... Workshop. SUMMARY: EPA is announcing that Eastern Research Group, Inc., an EPA contractor for external... Assessment (NCEA) within the EPA Office of Research and Development. EPA is releasing this draft assessment... be construed to represent any Agency policy or determination. Eastern Research Group, Inc. invites...
This report presents information and materials from a peer consultation workshop organized by Versar, Inc. (an EPA contractor) for EPA's Risk Assessment Forum. The meeting was held in Washington, DC on August 22 and 23, 2001. The meeting discussions focused on the August 2, 200...
48 CFR 945.610-4 - Contractor inventory in foreign countries.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor inventory in... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 945.610-4 Contractor inventory in foreign countries. Contractor inventory located in foreign countries...
48 CFR 852.237-70 - Contractor responsibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor....237-70 Contractor responsibilities. As prescribed in 837.110, insert the following clause: Contractor Responsibilities (APR 1984) The contractor shall obtain all necessary licenses and/or permits required to perform...
76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-31
...-AL92 Federal Acquisition Regulation; Oversight of Contractor Ethics Programs AGENCY: Department of... that contractors have implemented the mandatory contractor business ethics program requirements. DATES... to Improve DoD's Oversight of Contractor Ethics Programs. The ethics program requirement flows from...
41 CFR 109-43.302-50 - Utilization by designated contractors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... designated contractors. 109-43.302-50 Section 109-43.302-50 Public Contracts and Property Management Federal... Utilization by designated contractors. Heads of field organizations may authorize designated contractors to... Federal agency, provided the designated contractors have written policies and procedures. ...
30 CFR 45.4 - Independent contractor register.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Independent contractor register. 45.4 Section... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.4 Independent contractor register. (a) Each independent contractor shall provide the production-operator in writing the following information: (1) The independent...
41 CFR 60-741.68 - Reinstatement of ineligible contractors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ineligible contractors. 60-741.68 Section 60-741.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... Reinstatement of ineligible contractors. (a) Application for reinstatement. A contractor debarred from further...
41 CFR 60-300.68 - Reinstatement of ineligible contractors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ineligible contractors. 60-300.68 Section 60-300.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... ineligible contractors. (a) Application for reinstatement. A contractor debarred from further contracts for...
41 CFR 60-250.68 - Reinstatement of ineligible contractors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ineligible contractors. 60-250.68 Section 60-250.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... ineligible contractors. (a) Application for reinstatement. A contractor debarred from further contracts for...
48 CFR 52.246-1 - Contractor Inspection Requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Inspection....246-1 Contractor Inspection Requirements. As prescribed in 46.301, insert the following clause: Contractor Inspection Requirements (APR 1984) The Contractor is responsible for performing or having...
48 CFR 52.241-5 - Contractor's Facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Facilities....241-5 Contractor's Facilities. As prescribed in 41.501(c)(4), insert a clause substantially the same as the following: Contractor's Facilities (FEB 1995) (a) The Contractor, at its expense, unless...
30 CFR 45.3 - Identification of independent contractors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Identification of independent contractors. 45.3... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.3 Identification of independent contractors. (a) Any independent contractor may obtain a permanent MSHA identification number. To obtain an identification number...
48 CFR 52.204-7 - Central Contractor Registration.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Central Contractor....204-7 Central Contractor Registration. As prescribed in 4.1105, use the following clause: Central Contractor Registration (APR 2008) (a) Definitions. As used in this clause— Central Contractor Registration...
48 CFR 52.247-28 - Contractor's Invoices.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Invoices. 52....247-28 Contractor's Invoices. As prescribed in 47.207-9(c), insert the following clause in... services: Contractor's Invoices (APR 1984) The Contractor shall submit itemized invoices as instructed by...
41 CFR 60-1.31 - Reinstatement of ineligible contractors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ineligible contractors. 60-1.31 Section 60-1.31 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS General Enforcement; Compliance Review and Complaint Procedure § 60-1.31 Reinstatement of ineligible contractors. A contractor debarred from...
48 CFR 970.5244-1 - Contractor purchasing system.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970.4403 insert the following clause: Contractor Purchasing System (AUG 2009) (a) General. The Contractor...
48 CFR 1552.237-76 - Government-Contractor Relations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...
48 CFR 1552.237-76 - Government-Contractor Relations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...
48 CFR 242.7000 - Contractor business system deficiencies.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contractor business system... Business Systems 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...
48 CFR 242.7000 - Contractor business system deficiencies.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractor business system... Business Systems 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...
48 CFR 242.7000 - Contractor business system deficiencies.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractor business system... BUSINESS SYSTEMS 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...
48 CFR 242.7000 - Contractor business system deficiencies.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractor business system... BUSINESS SYSTEMS 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...
49 CFR 10.27 - Government contractors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Government contractors. 10.27 Section 10.27... INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a contract..., Criminal Penalties, any such contractor and any employee of the contractor are considered, in accordance...
14 CFR 1245.108 - License to contractor.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false License to contractor. 1245.108 Section... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor.... The license extends to the contractor's domestic subsidiaries and affiliates, if any, within the...
48 CFR 1552.237-76 - Government-Contractor Relations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...
48 CFR 952.251-70 - Contractor employee travel discounts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employee travel... Contractor employee travel discounts. As prescribed in 951.7002, insert the following clause: Contractor Employee Travel Discounts (AUG 2009) (a) The Contractor shall take advantage of travel discounts offered to...
49 CFR 199.245 - Contractor employees.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.245 Section 199.245... Prevention Program § 199.245 Contractor employees. (a) With respect to those covered employees who are contractors or employed by a contractor, an operator may provide by contract that the alcohol testing...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-29
...-AG52 Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor... that contractors providing essential contractor services, as determined by the requiring activity..., implementing the requirements of DoDI 3020.37, Continuation of Essential DoD Contractor Services During Crises...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Contractors. 136.6 Section 136.6 Foreign... Contractors. To the extent that contractors enjoy importation or tax privileges in a foreign country because... provisions in their contracts that require the contractors to observe the requirements of these regulations...
48 CFR 42.402 - Visits to contractors' facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Visits to contractors... contractors' facilities. (a) Government personnel planning to visit a contractor's facility in connection with... positions, and security clearances. (2) Date and duration of visit. (3) Name and address of contractor and...
29 CFR 500.60 - Farm labor contractors' recruitment, contractual and general obligations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 3 2010-07-01 2010-07-01 false Farm labor contractors' recruitment, contractual and... labor contractors' recruitment, contractual and general obligations. The Act imposes certain specific recruitment, contractual and general obligations on farm labor contractors and farm labor contractor employees...
Waste isolation safety assessment program. Task 4. Third contractor information meeting
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-06-01
The Contractor Information Meeting (October 14 to 17, 1979) was part of the FY-1979 effort of Task 4 of the Waste Isolation Safety Assessment Program (WISAP): Sorption/Desorption Analysis. The objectives of this task are to: evaluate sorption/desorption measurement methods and develop a standardized measurement procedure; produce a generic data bank of nuclide-geologic interactions using a wide variety of geologic media and groundwaters; perform statistical analysis and synthesis of these data; perform validation studies to compare short-term laboratory studies to long-term in situ behavior; develop a fundamental understanding of sorption/desorption processes; produce x-ray and gamma-emitting isotopes suitable for the study ofmore » actinides at tracer concentrations; disseminate resulting information to the international technical community; and provide input data support for repository safety assessment. Conference participants included those subcontracted to WISAP Task 4, representatives and independent subcontractors to the Office of Nuclear Waste Isolation, representatives from other waste disposal programs, and experts in the area of waste/geologic media interaction. Since the meeting, WISAP has been divided into two programs: Assessment of Effectiveness of Geologic Isolation Systems (AEGIS) (modeling efforts) and Waste/Rock Interactions Technology (WRIT) (experimental work). The WRIT program encompasses the work conducted under Task 4. This report contains the information presented at the Task 4, Third Contractor Information Meeting. Technical Reports from the subcontractors, as well as Pacific Northwest Laboratory (PNL), are provided along with transcripts of the question-and-answer sessions. The agenda and abstracts of the presentations are also included. Appendix A is a list of the participants. Appendix B gives an overview of the WRIT program and details the WRIT work breakdown structure for 1980.« less
Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report
NASA Technical Reports Server (NTRS)
Dorman, Lane
2015-01-01
This Corrective Measures Implementation (CMI) Progress Report, Revision 1, for Contractor's Road Heavy Equipment (CRHE) Area Solid Waste Management Unit (SWMU) Number 055 was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B, Delivery Order NNK09CA62D and Project Number PCN ENV-2324. This CMI Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site.
48 CFR 1852.242-73 - NASA contractor financial management reporting.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...
48 CFR 1852.242-73 - NASA contractor financial management reporting.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...
48 CFR 1852.242-73 - NASA contractor financial management reporting.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...
48 CFR 1852.242-73 - NASA contractor financial management reporting.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...
48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).
Code of Federal Regulations, 2010 CFR
2010-10-01
..., development, maintenance, and operation of Spanish-American installations and facilities. (b) The Contractor... this contract by reference. (c) The Contractor shall apply to the appropriate Spanish authorities for approval of status as a Direct Contractor in order to complete duty-free import of non-Spanish equipment...
38 CFR 46.8 - Independent contractors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Independent contractors... contractors. Independent contractors acting on behalf of the Department of Veterans Affairs are subject to the... provide the contractor with notice that a report of a clinical privileges action will be filed with the...
48 CFR 1252.242-71 - Contractor testimony.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor testimony. 1252... Contractor testimony. As prescribed in (TAR) 48 CFR 1242.7000(b), insert the following clause: Contractor Testimony (OCT 1994) All requests for the testimony of the Contractor or its employees, and any intention to...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-22
... Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access... Government support contractors to have access to proprietary technical data belonging to prime contractors and other third parties, provided that the technical data owner may require the support contractor to...
49 CFR 199.115 - Contractor employees.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.115 Section 199.115... § 199.115 Contractor employees. With respect to those employees who are contractors or employed by a contractor, an operator may provide by contract that the drug testing, education, and training required by...
48 CFR 1852.209-72 - Composition of the contractor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contractor. 1852.209-72 Section 1852.209-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one legal...
40 CFR 35.938-6 - Progress payments to contractors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Progress payments to contractors. 35... § 35.938-6 Progress payments to contractors. (a) Policy. EPA policy is that, except as State law otherwise provides, grantees should make prompt progress payments to prime contractors and prime contractors...
41 CFR 109-38.301-1 - Contractors' use.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Contractors' use. 109-38...-38.301-1 Contractors' use. Heads of field organizations shall ensure that provisions of the FPMR concerning contractor use of Government motor vehicles are complied with by their designated contractors. ...
7 CFR 1726.27 - Contractor's bonds.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Contractor's bonds. 1726.27 Section 1726.27... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.27 Contractor's bonds. (a) RUS Form 168b, Contractor's Bond, shall be used when a contractor's bond is required by RUS Forms 200, 257...
48 CFR 1809.670 - Contract clause.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...
48 CFR 1809.670 - Contract clause.
Code of Federal Regulations, 2012 CFR
2012-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...
48 CFR 1809.670 - Contract clause.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...
48 CFR 1809.670 - Contract clause.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...
Report on audit of Department of Energy`s contractor salary increase fund
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-04-04
The Department of Energy (Department) uses contractors to operate its facilities and compensates contractor employees based on their skills, complexity of jobs, and work performance. Thirty-one of the Department`s major contractors reported a total payroll of $4.3 billion and $4.4 billion during 1994 and 1995, respectively. The 31 contractors also reported awarding salary increases of $18 million for 1994 and $200 million for 1995. The purpose of the audit was to review the process used to determine and approve the amount of salary increases for contractor employees. The specific audit objective was to determine whether salary increases received by contractormore » employees were in accordance with Departmental policies and procedures. The Department of Energy Acquisition Regulation (DEAR) requires that contractor salary actions be within specific limitations, supportable, and approved prior to incurrence of costs. In addition, the Secretary of Energy imposed a 1 year salary freeze on the merit portion of management and operating contractor employee salaries for each contractor`s Fiscal Year 1994 compensation year. However, a fund for promotions and adjustments was approved but limited to 0.5 percent of payroll for the year. A review of eight major contractors showed that six complied with the Department`s policies on salary increases. The other two gave salary increases that were not always in accordance with Departmental policies. This resulted in both contractors not fully complying with the pay freeze in 1994 and exceeding their salary increase fund budgets in 1995. If these two contractors had implemented Department and contract requirements and contracting officers had properly performed their contract administrative responsibilities concerning salary increase funds, both contractors would have frozen salary increases and would not have exceeded their annual budgets.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-18
... expands a coordinated network of S&T Laboratories and other FFRDC to help deliver critical homeland... typically in place at institutions conducting biological research involving potentially high- risk agents to... biological threats and select agents and toxins. During such research, there is always a possibility that DHS...
2005-05-01
efficiencies similar to those in the private sector . However, along the way, Government and private sector industry have begun to disagree about how PPI is...double that of the private sector due to an evaluation process that is cumbersome, time-consuming, and lacking the efficiencies enjoyed by private
Code of Federal Regulations, 2010 CFR
2010-10-01
... program beneficiaries, contractors, providers, suppliers, and grantees; audit disallowance determinations.... Debts arising under the Social Security Act are overpayments to, or contributions, reimbursements, penalties or assessments owed by, any entity, individual, or State under the Social Security Act. Such...
Code of Federal Regulations, 2011 CFR
2011-10-01
... program beneficiaries, contractors, providers, suppliers, and grantees; audit disallowance determinations.... Debts arising under the Social Security Act are overpayments to, or contributions, reimbursements, penalties or assessments owed by, any entity, individual, or State under the Social Security Act. Such...
Constellation Program (CxP) Crew Exploration Vehicle (CEV) Project Integrated Landing System
NASA Technical Reports Server (NTRS)
Baker, John D.; Yuchnovicz, Daniel E.; Eisenman, David J.; Peer, Scott G.; Fasanella, Edward L.; Lawrence, Charles
2009-01-01
Crew Exploration Vehicle (CEV) Chief Engineer requested a risk comparison of the Integrated Landing System design developed by NASA and the design developed by Contractor- referred to as the LM 604 baseline. Based on the results of this risk comparison, the CEV Chief engineer requested that the NESC evaluate identified risks and develop strategies for their reduction or mitigation. The assessment progressed in two phases. A brief Phase I analysis was performed by the Water versus Land-Landing Team to compare the CEV Integrated Landing System proposed by the Contractor against the NASA TS-LRS001 baseline with respect to risk. A phase II effort examined the areas of critical importance to the overall landing risk, evaluating risk to the crew and to the CEV Crew Module (CM) during a nominal land-landing. The findings of the assessment are contained in this report.
41 CFR 109-45.300-50 - Sales by designated contractors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... contractors. 109-45.300-50 Section 109-45.300-50 Public Contracts and Property Management Federal Property... § 109-45.300-50 Sales by designated contractors. Sales of surplus contractor inventory will be conducted by designated contractors when heads of field organizations determine that it is in the best interest...
4 CFR 83.19 - Government contractors.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 4 Accounts 1 2010-01-01 2010-01-01 false Government contractors. 83.19 Section 83.19 Accounts... contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel... of this part to be applied to such system. Any such contractor and any employee of such contractor...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-06
... for OMB Review; Comment Request; Application for a Farm Labor Contractor or Farm Labor Contractor..., ``Application for a Farm Labor Contractor or Farm Labor Contractor Employee Certificate of Registration,'' to..., certain vehicle and safety standards are required of farm labor contractor applicants and such data is...
48 CFR 2110.7002 - Contractor investment of FEGLI Program funds.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Contractor investment of FEGLI Program funds. (a) The Contractor is required to invest and reinvest all FEGLI... Contractor is required to credit income earned from its investment of FEGLI Program funds to the FEGLI... appropriate manner. If the Contractor fails to invest funds on hand, properly allocate investment income, or...
Assessing the Validity of a Single-Item HIV Risk Stage-of-Change Measure
ERIC Educational Resources Information Center
Napper, Lucy E.; Branson, Catherine M.; Fisher, Dennis G.; Reynolds, Grace L.; Wood, Michelle M.
2008-01-01
This study examined the validity of a single-item measure of HIV risk stage of change that HIV prevention contractors were required to collect by the California State Office of AIDS. The single-item measure was compared to the more conventional University of Rhode Island Change Assessment (URICA). Participants were members of Los Angeles…
Code of Federal Regulations, 2013 CFR
2013-10-01
... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.603 Policy. The Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and... encourage the dissolution of contractor team arrangements. ...
Code of Federal Regulations, 2012 CFR
2012-10-01
... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.603 Policy. The Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and... encourage the dissolution of contractor team arrangements. ...
Code of Federal Regulations, 2014 CFR
2014-10-01
... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.603 Policy. The Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and... encourage the dissolution of contractor team arrangements. ...
Code of Federal Regulations, 2011 CFR
2011-10-01
... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.603 Policy. The Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and... encourage the dissolution of contractor team arrangements. ...
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.603 Policy. The Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and... encourage the dissolution of contractor team arrangements. ...
Code of Federal Regulations, 2010 CFR
2010-07-01
..., prior to such employee's engagement in any activity enumerated in section 3(6) of the Act. A farm labor... farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm...
Code of Federal Regulations, 2011 CFR
2011-07-01
..., prior to such employee's engagement in any activity enumerated in section 3(6) of the Act. A farm labor... farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm...
10 CFR 727.6 - What are the obligations of a DOE contractor?
Code of Federal Regulations, 2012 CFR
2012-01-01
... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or other...
10 CFR 727.6 - What are the obligations of a DOE contractor?
Code of Federal Regulations, 2013 CFR
2013-01-01
... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or other...
10 CFR 727.6 - What are the obligations of a DOE contractor?
Code of Federal Regulations, 2014 CFR
2014-01-01
... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or other...
42 CFR 455.202 - Limitation on contractor liability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 4 2010-10-01 2010-10-01 false Limitation on contractor liability. 455.202 Section... § 455.202 Limitation on contractor liability. (a) A program contractor, a person, or an entity employed... contractor will not be held to have violated any criminal law and will not be held liable in any civil action...
10 CFR 727.6 - What are the obligations of a DOE contractor?
Code of Federal Regulations, 2010 CFR
2010-01-01
... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or other...
10 CFR 727.6 - What are the obligations of a DOE contractor?
Code of Federal Regulations, 2011 CFR
2011-01-01
... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or other...
Preliminary base heating environments for a generalized ALS LO2/LH2 launch vehicle, appendix 1 and 2
NASA Technical Reports Server (NTRS)
Bender, Robert L.; Reardon, John E.
1989-01-01
A secondary objective of contract NAS8-39141 is to provide base heating assessments, as required, to support Advanced Launch System (ALS) preliminary launch vehicle and propulsion system design studies. The ALS propulsion systems integration working group meeting (No. 3) recently completed in San Diego, California, focused attention on the need for base heating environment determination to provide preliminary requirements for LO2/LH2 propulsion systems currently being considered for ALS. We were requested to provide these environments for a range of possible propellant mixture and nozzle area ratios. Base heating environments can only be determined as a function of altitude when the engine operating conditions and vehicle base region geometry (engine arrangement) are known. If time dependent environments are needed to assess thermal loads, a trajectory must also be provided. These parameters are not fixed at this time since the ALS configurations and propulsion operating conditions are varied and continue to be studied by Phase B contractors. Therefore, for this study, a generalized LO2/LH2 system was selected along with a vehicle configuration consisting of a seven-engine booster and a three-engine core. MSFC provided guidance for the selection. We also selected a limited number of body points on the booster and core vehicles and engines for the environment estimates. Environments at these locations are representative of maximum heating conditions in the base region and are provided as a function of altitude only. Guidelines and assumptions for this assessment, methodology for determining the environments, and preliminary results are provided in this technical note. Refinements in the environments will be provided as the ALS design matures.
48 CFR 1552.237-76 - Government-Contractor Relations.
Code of Federal Regulations, 2014 CFR
2014-10-01
...: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that... event the notice is inadequate to make a decision, advise the Contractor what additional information is...
48 CFR 1552.237-76 - Government-Contractor Relations.
Code of Federal Regulations, 2012 CFR
2012-10-01
...: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that... event the notice is inadequate to make a decision, advise the Contractor what additional information is...
48 CFR 970.4402 - Contractor purchasing system.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402 Contractor purchasing system. ...
48 CFR 1845.502 - Contractor responsibility.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor responsibility. 1845.502 Section 1845.502 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Contractors 1845.502 Contractor responsibility. ...
Dutra, Lauren M.; Okechukwu, Cassandra A.
2013-01-01
Objectives This paper sought to assess organizational safety practices at three different levels of hierarchical workplace structure and to examine their association with injury outcomes among construction apprentices. Methods Using a cross-sectional sample of 1,775 construction apprentices, three measures of organizational safety practice were assessed: contractor-, steward-, and coworker-safety practice. Each safety practice measure was assessed using three similar questions (i.e., on-the-job safety commitment, following required or recommended safe work practices, and correcting unsafe work practices); the summed average of the responses ranged from 1 to 4, with a higher score indicating poorer safety practice. Outcome variables included the prevalence of four types of musculoskeletal pain (i.e., neck, shoulder, hand, and back pain) and injury-related absence. Results In adjusted analyses, contractor-safety practice was associated with both hand pain (OR: 1.27, 95 % CI: 1.04, 1.54) and back pain (OR: 1.40, 95 % CI: 1.17, 1.68); coworker-safety practice was related to back pain (OR: 1.42, 95 % CI: 1.18, 1.71) and injury-related absence (OR: 1.36, 95 % CI: 1.11, 1.67). In an analysis that included all three safety practice measures simultaneously, the association between coworker-safety practice and injury-related absence remained significant (OR: 1.68, 95 % CI: 1.20, 2.37), whereas all other associations became non-significant. Conclusions This study suggests that organizational safety practice, particularly coworker-safety practice, is associated with injury outcomes among construction apprentices. PMID:23748366
Code of Federal Regulations, 2011 CFR
2011-10-01
... CONTRACT ADMINISTRATION AND AUDIT SERVICES Bankruptcy 42.902 Procedures. (a) When notified of bankruptcy... appropriate agency offices (e.g., contracting, financial, property) and affected buying activities; (2) Determine the amount of the Government's potential claim against the contractor (in assessing this impact...
42 CFR 460.62 - Governing body.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Management and provision of all services, including the management of contractors. (4) Establishment of... participants. (7) Quality assessment and performance improvement program. (b) Participant advisory committee... provide the liaison to the governing body with meeting minutes that include participant issues. (c...
VISION-BASED MONITORING AND CONTROL OF CONSTRUCTION OPERATIONS CARBON FOOTPRINT
Automated and continuous carbon footprint monitoring of construction operations support the contractors and project managers with information required for assessment on carbon footprint of various construction operation alternatives. This can ultimately lead to reduction of...
Embankment quality and assessment of moisture control implementation.
DOT National Transportation Integrated Search
2016-02-01
A specification for contractor moisture quality control (QC) in roadway embankment construction has been in use for approximately 10 : years in Iowa on about 190 projects. The use of this QC specification and the development of the soils certificatio...
Embankment quality and assessment of moisture control implementation : tech transfer summary.
DOT National Transportation Integrated Search
2016-02-01
The motivation for this project was based on work by : Iowa State University (ISU) researchers at a few recent : grading projects that demonstrated embankments were : being constructed outside moisture control limits, even : though the contractor QC ...
28 CFR 115.277 - Corrective action for contractors and volunteers.
Code of Federal Regulations, 2012 CFR
2012-07-01
... volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... Corrective action for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse... contractor or volunteer. ...
28 CFR 115.277 - Corrective action for contractors and volunteers.
Code of Federal Regulations, 2014 CFR
2014-07-01
... volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... Corrective action for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse... contractor or volunteer. ...
28 CFR 115.277 - Corrective action for contractors and volunteers.
Code of Federal Regulations, 2013 CFR
2013-07-01
... volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... Corrective action for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse... contractor or volunteer. ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Certa, P.J.
1998-01-07
Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations,more » work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less
48 CFR 1602.170-4 - Contractor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor. 1602.170-4 Section 1602.170-4 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES... 1602.170-4 Contractor. Contractor means carrier. ...
48 CFR 1609.471 - Contractor certification.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor certification... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1609.471 Contractor certification. All FEHBP carriers and applicant carriers...
Key aspects in managing safety when working with multiple contractors: A case study.
Drupsteen, Linda; Rasmussen, Hanna B; Ustailieva, Erika; van Kampen, Jakko
2015-01-01
Working with multiple contractors in a shared workplace can introduce and increase safety risks due to complexity. The aim of this study was to explore how safety issues are recognized in a specific case and to identify whether clients and contractors perceive problems similarly. The safety issues are explored through a brief survey and a workshop in the maintenance department of a logistics company. The results indicate that culture and behavior are recognized differently by clients and by contractors. The contractors and client had different perceptions of involvement of contractors by the client. The contractors complained on lack of involvement, which was not fully recognized by the client. The case study used a practical approach to show differences in perception of safety within a project. The study illustrates the need for more applied studies and interventions on contractor safety.
JUICE: A European mission to explore the emergence of habitable worlds around gas giants
NASA Astrophysics Data System (ADS)
Witasse, O.
2017-09-01
JUICE - JUpiter ICy moons Explorer - is the first large mission in the ESA Cosmic Vision 2015-2025 programme. The mission was selected in May 2012 and adopted in November 2014. The implementation phase started in July 2015, following the selection of the prime industrial contractor, Airbus Defense and Space (Toulouse, France). Due to launch in June 2022 and arrival at Jupiter in October 2029, it will spend at least three ½ years making detailed observations of Jupiter and three of its largest moons, Ganymede, Callisto and Europa.
ATHENA: system design and implementation for a next-generation x-ray telescope
NASA Astrophysics Data System (ADS)
Ayre, M.; Bavdaz, M.; Ferreira, I.; Wille, E.; Lumb, D.; Linder, M.; Stefanescu, A.
2017-08-01
ATHENA, Europe's next generation x-ray telescope, is currently under Assessment Phase study with parallel candidate industrial Prime contractors after selection for the 'L2' slot in ESA's Cosmic Vision Programme, with a mandate to address the 'Hot and Energetic Universe' Cosmic Vision science theme. This paper will consider the main technical requirements of the mission, and their mapping to resulting design choices at both mission and spacecraft level. The reference mission architecture and current reference spacecraft design will then be described, with particular emphasis given to description of the Science Instrument Module (SIM) design, currently under the responsibility of the ESA Study Team. The SIM is a very challenging item due primarily to the need to provide to the instruments (i) a soft ride during launch, and (ii) a very large ( 3 kW) heat dissipation capability at varying interface temperatures and locations.
48 CFR 245.608 - Screening of contractor inventory.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Screening of contractor inventory. 245.608 Section 245.608 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Disposal of Contractor Inventory 245.608 Screening of contractor inventory. ...
Defense Primer: DOD Contractors
2017-02-10
contractors . A defense contractor , as defined by the Code of Federal Regulations, is “any individual, firm, corporation, partnership, association...158.3, “Definitions”). Within the defense policy community, the term contractor is commonly used in two different contexts. The word can describe
Project #OMS-FY12-0006, February 15, 2012. The U.S. Environmental Protection Agency (EPA) Office of Inspector General plans to begin preliminary research for the subject project, which will be performed by a contractor.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-06-01
The study subject of this meeting was the adsorption and desorption of radionuclides on geologic media under repository conditions. This volume contans eight papers. Separate abstracts were prepared for all eight papers. (DLC)
Annual Industrial Capabilities Report to Congress
2008-03-01
61 5.1 Aircraft Sector Industrial Summary...basis, key contractor workforce capabilities necessary for successful programs. Industry segment-level baseline assessments ( aircraft ; command, control...monitored representative individual corporate divisions for each major industry segment ( aircraft parts and components, water craft, ground vehicles
2013-09-01
leadership, and management responsibilities. In addition, AU is responsible for research in designated fields of aerospace, education, leadership...County, Alabama. Designation : Final Environmental Assessment Abstract: As a result of a memorandum signed by President Obama in June 2010, the...Force Exchange Service) -ANG (Air National Guard) & Reserve facilities -Government-owned, contractor-funded facilities -RDT&E ( Research
Land Warrior (LW)/Mounted Warrior (MW) DOTMLPF Assessment
2007-06-01
the DOTMLPF impacts of equipping a Stryker battalion with MW and LW? 3) What is the estimated life cycle cost (LCC) of each LW BOIP alternative? 4...A R E D A T A Assessed costs included: - Support Equipment/Disposal. - Contractor Logistics Support. - Ensemble Hardware...DOTMLPF . 3 - Cost . LUT Navigation Experiment Lethality Experiment AMSAA TRAC-WSMR TRAC-WSMR ATEC LW Test Unit
48 CFR 1509.170-4 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... each performance category. Ratings are defined as follows: 0 = unsatisfactory, 1 = poor, 2 = fair, 3... PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-4 Definitions. (a) Contractor Performance Report is an evaluation of a contractor's performance for a specified period of time...
Code of Federal Regulations, 2010 CFR
2010-10-01
... GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management System (IFMS) 51.201 Policy... contractors to obtain, for official purposes only, interagency fleet management system (IFMS) vehicles and... instance. (c) Government contractors shall not be authorized to obtain interagency fleet management system...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-30
...; Information Collection; Contractor Business Ethics Compliance Program and Disclosure Requirements AGENCIES... concerning contractor business ethics compliance program and disclosure requirements. Public comments are... Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure Requirements, by any of...
48 CFR 47.207-5 - Contractor responsibilities.
Code of Federal Regulations, 2014 CFR
2014-10-01
....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be shipped and services required. The contracting officer shall specify clearly those service requirements... freight. The contracting officer shall insert the clause at 52.247-16, Contractor Responsibility for...
48 CFR 47.207-5 - Contractor responsibilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be shipped and services required. The contracting officer shall specify clearly those service requirements... freight. The contracting officer shall insert the clause at 52.247-16, Contractor Responsibility for...
48 CFR 47.207-5 - Contractor responsibilities.
Code of Federal Regulations, 2012 CFR
2012-10-01
....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be shipped and services required. The contracting officer shall specify clearly those service requirements... freight. The contracting officer shall insert the clause at 52.247-16, Contractor Responsibility for...
48 CFR 47.207-5 - Contractor responsibilities.
Code of Federal Regulations, 2013 CFR
2013-10-01
....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be shipped and services required. The contracting officer shall specify clearly those service requirements... freight. The contracting officer shall insert the clause at 52.247-16, Contractor Responsibility for...
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.604 Limitations. Nothing in this subpart authorizes contractor team arrangements in violation of antitrust statutes or limits the Government's rights to— (a... team arrangement, the responsibility of the prime contractor (see subpart 9.1); (c) Provide to the...
Code of Federal Regulations, 2013 CFR
2013-10-01
... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.604 Limitations. Nothing in this subpart authorizes contractor team arrangements in violation of antitrust statutes or limits the Government's rights to— (a... team arrangement, the responsibility of the prime contractor (see subpart 9.1); (c) Provide to the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.604 Limitations. Nothing in this subpart authorizes contractor team arrangements in violation of antitrust statutes or limits the Government's rights to— (a... team arrangement, the responsibility of the prime contractor (see subpart 9.1); (c) Provide to the...
Code of Federal Regulations, 2012 CFR
2012-10-01
... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.604 Limitations. Nothing in this subpart authorizes contractor team arrangements in violation of antitrust statutes or limits the Government's rights to— (a... team arrangement, the responsibility of the prime contractor (see subpart 9.1); (c) Provide to the...
Code of Federal Regulations, 2014 CFR
2014-10-01
... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.604 Limitations. Nothing in this subpart authorizes contractor team arrangements in violation of antitrust statutes or limits the Government's rights to— (a... team arrangement, the responsibility of the prime contractor (see subpart 9.1); (c) Provide to the...
48 CFR 33.207 - Contractor certification.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor certification... CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 33.207 Contractor certification. (a) Contractors shall provide the certification specified in paragraph (c) of this section when...
77 FR 7579 - Debarment, Suspension, and Ineligibility of Contractors
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-13
... GOVERNMENT ACCOUNTABILITY OFFICE Debarment, Suspension, and Ineligibility of Contractors AGENCY... government contractors. Comments on GAO's policy were due on or before November 14, 2011. GAO received two... debarment, suspension, and ineligibility of government contractors. Neither comment suggested any changes to...
48 CFR 725.703 - Contractor employees.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employees. 725... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.703 Contractor employees. (a... on employees or consultants of either contractors or subcontractors providing services under an USAID...
48 CFR 450.303-1 - Contractor requests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor requests. 450.303-1 Section 450.303-1 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Contract Adjustments 450.303-1 Contractor requests. Contractor...
76 FR 60838 - Debarment, Suspension, and Ineligibility of Contractors
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-30
... GOVERNMENT ACCOUNTABILITY OFFICE Debarment, Suspension, and Ineligibility of Contractors AGENCY... of government contractors. As a legislative branch agency, GAO is not subject to the requirements of... (hereinafter, contractors) who are responsible. However, GAO's Procurement Order has not explicitly referenced...
28 CFR 548.14 - Community involvement (volunteers, contractors).
Code of Federal Regulations, 2010 CFR
2010-07-01
..., contractors). 548.14 Section 548.14 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE... Community involvement (volunteers, contractors). (a) The institution's chaplain may contract with... require a recognized representative of the faith group to verify a volunteer's or contractor's religious...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Contractors. 68.87 Section 68.87... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This section applies to contractors performing maintenance or repair, turnaround, major renovation, or...
48 CFR 45.501 - Prime contractor alternate locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor... administration from another contract administration office, for purposes of evaluating prime contractor...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-27
...; Information Collection; Contractors' Purchasing Systems Reviews AGENCY: Department of Defense (DOD), General... collection requirement concerning contractors' purchasing systems reviews. Public comments are particularly... Information Collection 9000- 0132, Contractors' Purchasing Systems Reviews, by any of the following methods...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-23
...; Information Collection; Central Contractor Registration AGENCY: Department of Defense (DOD), General Services... requirement concerning the Central Contractor Registration database. Public comments are particularly invited... Information Collection 9000- 0159, Central Contractor Registration, by any of the following methods...
78 FR 12106 - Debarment, Suspension, and Ineligibility of Contractors
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-21
... OFFICE OF PERSONNEL MANAGEMENT Debarment, Suspension, and Ineligibility of Contractors AGENCY: U.S... Acquisition Regulation (FAR) regarding the debarment, suspension, and ineligibility of government contractors... ensure that it contracts only with those entities and individuals (hereinafter, contractors) who are...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-22
...; Information Collection; Central Contractor Registration AGENCIES: Department of Defense (DOD), General... collection requirement concerning the Central Contractor Registration database. A notice was published in the... Information Collection 9000- 0159, Central Contractor Registration, by any of the following methods...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-23
... Information Collection; Independent Contractor Registration and Identification AGENCY: Mine Safety and Health...-00040, Independent Contractor Register. OMB last approved this information collection request (ICR) on...); or 202-693-9441 (facsimile). SUPPLEMENTARY INFORMATION: I. Background Independent contractors...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-27
...; Submission for OMB Review; Contractors Performing Private Security Functions Outside the United States... new information collection requirement concerning Contractors Performing Private Security Functions... identified by Information Collection 9000- 0184, Contractors Performing Private Security Functions Outside...
48 CFR 46.301 - Contractor inspection requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inspection... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.301 Contractor inspection requirements. The contracting officer shall insert the clause at 52.246-1, Contractor Inspection Requirements, in solicitations...
48 CFR 1553.209-70 - EPA Form 1900-26, Contracting Officer's Evaluation of Contractor Performance.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., Contracting Officer's Evaluation of Contractor Performance. 1553.209-70 Section 1553.209-70 Federal... 1553.209-70 EPA Form 1900-26, Contracting Officer's Evaluation of Contractor Performance. As prescribed... evaluation of Contractor performance. ...
42 CFR 405.1012 - When CMS or its contractors may be a party to a hearing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 2 2010-10-01 2010-10-01 false When CMS or its contractors may be a party to a... Hearings § 405.1012 When CMS or its contractors may be a party to a hearing. (a) CMS and/or one or more of... unrepresented beneficiary. (b) CMS and/or the contractor(s) advises the ALJ, appellant, and all other parties...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Efroymson, R.A.
2001-01-12
This is a companion report to the risk assessment framework proposed by Suter et al. (1998): ''A Framework for Assessment of Risks of Military Training and Testing to Natural Resources,'' hereafter referred to as the ''generic framework.'' The generic framework is an ecological risk assessment methodology for use in environmental assessments on Department of Defense (DoD) installations. In the generic framework, the ecological risk assessment framework of the US Environmental Protection Agency (EPA 1998) is modified for use in the context of (1) multiple and diverse stressors and activities at a military installation and (2) risks resulting from causal chains,more » e.g., effects on habitat that indirectly impact wildlife. Both modifications are important if the EPA framework is to be used on military installations. In order for the generic risk assessment framework to be useful to DoD environmental staff and contractors, the framework must be applied to specific training and testing activities. Three activity-specific ecological risk assessment frameworks have been written (1) to aid environmental staff in conducting risk assessments that involve these activities and (2) to guide staff in the development of analogous frameworks for other DoD activities. The three activities are: (1) low-altitude overflights by fixed-wing and rotary-wing aircraft (this volume), (2) firing at targets on land, and (3) ocean explosions. The activities were selected as priority training and testing activities by the advisory committee for this project.« less
NASA Astrophysics Data System (ADS)
Oo, B. L.; Yan, Y.
2018-04-01
There are many variables that public clients need to consider in their bidding procedure to enhance efficiency in their procurement for construction services. This paper focusses on the competitive bidding process for public sector procurement of construction services in Singapore. A distinctive feature of the Singapore government competitive bidding process is that full bidding feedback information is released to all competing bidders (and public). The specific objectives are: (i) to examine the degree of competition in the construction markets; and (ii) to examine the bidding performance of competing bidders. Based on a collection of bidding data for a 15-month period, the results show the market environment of the Singapore public sector construction contracting is highly competitive with long bidder lists. In selection of contractors, only 50% of the contracts were awarded to lowest bidders. The results also show that the competing contractors can be broadly classified into three groups based on their bidding performance in terms of number of bidding attempts, bidding success rate and bidding competitiveness. These results provide a useful insight into the bidding competition in the Singapore public sector construction contracting, especially to new market entrants and foreign contractors who want to bid for jobs in Singapore.
An Assessment of the Armed Forces of the Philippines Modernization Program
2007-12-14
Sayaff Group BAC Bids and Awards Committee BCDA Bases Conversion and Development Authority BEP Bid Evaluation Plan BIR Bureau of Internal Revenue...contractor execute the requirements of the contract with regard to cost, schedule and performance (Sammet and Green 1990, 136) Bid Evaluation Plan or BEP is...adopted in the evaluation and assessment of bidders’ statements and the method and criteria for the evaluation and assessment of bids. The BEP also
48 CFR 1552.209-76 - Contractor performance evaluations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor performance... 1552.209-76 Contractor performance evaluations. As prescribed in section 1509.170-1, insert the following clause in all applicable solicitations and contracts. Contractor Performance Evaluations (OCT 2002...
78 FR 1256 - Guam Military Base Realignment Contractor Recruitment Standards
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-08
... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Final notice... issuing this notice to announce recruitment standards that construction contractors are required to follow... B) by adding a new subsection (6). This provision prohibits contractors engaged in construction...
48 CFR 8.406-7 - Contractor Performance Evaluation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance... ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 8.406-7 Contractor Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-23
... Federal Acquisition Regulation; Contractors Performing Private Security Functions Outside the United.... 110-181, enacted January 28, 2008), section 862, entitled ``Contractors Performing Private Security... NDAA required standardization of rules for private security contractors that are performing in...
78 FR 11164 - Policy on Contractor Profits
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-15
... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System Policy on Contractor Profits AGENCY... Authorization Act for Fiscal Year 2013. Section 804, Department of Defense Policy on Contractor Profits... modifications to such guidelines that are necessary to ensure an appropriate link between contractor profit and...
77 FR 3503 - Guam Military Base Realignment Contractor Recruitment Standards
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-24
... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Notice... issuing this notice to announce the recruitment standards that construction contractors are required to... contractors engaged in construction projects related to the realignment of U.S. military forces from Okinawa...
48 CFR 2936.201 - Evaluation of contractor performance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor... Construction 2936.201 Evaluation of contractor performance. The HCA must establish procedures to evaluate construction contractor performance and prepare performance reports as required by FAR 36.201. ...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-23
...] Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients AGENCY: Office... information collection requirement regarding Central Contractor Registration Requirements for Prime Grant... for the proper performance of functions of the Central Contractor Registration Requirements for Prime...
48 CFR 970.5203-3 - Contractor's organization.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor's organization... for Management and Operating Contracts 970.5203-3 Contractor's organization. As prescribed in 970.0371-9, insert the following clause: Contractor's Organization (DEC 2000) (a) Organization chart. As...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-27
...; Submission for OMB Review; Contractor Business Ethics Compliance Program and Disclosure Requirements AGENCIES... contractor business ethics compliance program and disclosure requirements. Public comments are particularly... Information Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure Requirements...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-21
...] RIN 9000-AM20 Federal Acquisition Regulation; Contractors Performing Private Security Functions...-181). Section 862, entitled ``Contractors Performing Private Security Functions in Areas of Combat...), as amended, entitled ``Contractors Performing Private Security Functions in Areas of Combat...
A feasibility study of orbiter flight control experiments
NASA Technical Reports Server (NTRS)
Geissler, W. H.
1978-01-01
The results of a feasibility study of orbiter flight control experiments performed are summarized. Feasibility studies were performed on a group of 14 experiments selected from a candidate list of 35 submitted to the study contractor by the flight control community. Concepts and requirements were developed for the 14 selected experiments and they were ranked on a basis of technical value, feasibility, and cost. It was concluded that all the selected experiments can be considered as potential candidates for the Orbiter Experiment program, which is being formulated for the Orbiter Flight Tests and subsequent operational flights, regardless of the relative ranking established during the study. None of the selected experiments has significant safety implications and the cost of most was estimated to be less than $200K.
NDE detectability of fatigue-type cracks in high-strength alloys: NDI reliability assessments
NASA Technical Reports Server (NTRS)
Christner, Brent K.; Long, Donald L.; Rummel, Ward D.
1988-01-01
This program was conducted to generate quantitative flaw detection capability data for the nondestructive evaluation (NDE) techniques typically practiced by aerospace contractors. Inconel 718 and Haynes 188 alloy test specimens containing fatigue flaws with a wide distribution of sizes were used to assess the flaw detection capabilities at a number of contractor and government facilities. During this program 85 inspection sequences were completed presenting a total of 20,994 fatigue cracks to 53 different inspectors. The inspection sequences completed included 78 liquid penetrant, 4 eddy current, and 3 ultrasonic evaluations. The results of the assessment inspections are presented and discussed. In generating the flaw detection capability data base, procedures for data collection, data analysis, and specimen care and maintenance were developed, demonstrated, and validated. The data collection procedures and methods that evolved during this program for the measurement of flaw detection capabilities and the effects of inspection variables on performance are discussed. The Inconel 718 and Haynes 188 test specimens that were used in conducting this program and the NDE assessment procedures that were demonstrated, provide NASA with the capability to accurately assess the flaw detection capabilities of specific inspection procedures being applied or proposed for use on current and future fracture control hardware program.
48 CFR 970.5244-1 - Contractor purchasing system.
Code of Federal Regulations, 2011 CFR
2011-10-01
... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970... management system. The Contractor's approved purchasing system and methods shall include the requirements set... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contractor purchasing...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
...; Submission for OMB Review; Contractors' Purchasing Systems Reviews AGENCY: Department of Defense (DOD... approved information collection requirement concerning contractors' purchasing systems reviews. A notice... Collection 9000- 0132, Contractors' Purchasing Systems Reviews, by any of the following methods: Regulations...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-23
...; Information Collection; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department of... previously approved information collection requirement concerning contractor use of interagency fleet... Collection 9000- 0032, Contractor Use of Interagency Fleet Management System Vehicles, by any of the...
48 CFR 47.305-15 - Loading responsibilities of contractors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Loading responsibilities of contractors. 47.305-15 Section 47.305-15 Federal Acquisition Regulations System FEDERAL... responsibilities of contractors. (a)(1) Contractors are responsible for loading, blocking, and bracing carload...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-29
...; Submission for OMB Review; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department... previously approved information collection requirement concerning contractor use of interagency fleet... comments identified by Information Collection 9000- 0032, Contractor Use of Interagency Fleet Management...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-30
...-AH97 Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee... contractor and subcontractor employees. DATES: Effective date: September 30, 2013. In accordance with FAR 1... Whistleblower Protections for Contractor Employees) made extensive changes to 10 U.S.C. 2409, entitled...
24 CFR 242.53 - Excluded contractors.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Excluded contractors. 242.53... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.53 Excluded contractors. (a) Contracts relating to the... participation in federal programs, including but not limited to: A general contractor, a subcontractor, or...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-11
... Proposed Information Collection to OMB; Contractor's Requisition--Project Mortgages AGENCY: Office of the.... Contractor's monthly application for distribution of insured mortgage proceeds for construction costs... Following Information Title of Proposal: Contractor's Requisition--Project Mortgages. OMB Approval Number...
48 CFR 2152.215-70 - Contractor records retention.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... PRECONTRACT PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 2152.215-70 Contractor records retention. As prescribed in 2115.071, insert the following clause: Contractor Records Retention (OCT 2005...
75 FR 69037 - Medicaid Program; Recovery Audit Contractors
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-10
... [CMS-6034-P] RIN 0938-AQ19 Medicaid Program; Recovery Audit Contractors AGENCY: Centers for Medicare... Recovery Audit Contractors (Medicaid RACs) and the payment methodology for State payments to Medicaid RACs... RACs coordinate with other contractors and entities auditing Medicaid providers and with State and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-26
... Contractors and Subcontractors Regarding Protected Veterans; Proposed Rule #0;#0;Federal Register / Vol. 76... Nondiscrimination Obligations of Contractors and Subcontractors Regarding Protected Veterans AGENCY: Office of..., which requires covered Federal contractors and subcontractors to take affirmative action in employment...
48 CFR 3036.201 - Evaluation of contractor performance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 3036.201 Section 3036.201 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... contractor performance. (a)(2) Performance reports shall be prepared and entered into the Contractor...
48 CFR 36.506 - Superintendence by the contractor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contractor. 36.506 Section 36.506 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Superintendence by the contractor. The contracting officer shall insert the clause at 52.236-6, Superintendence by the Contractor, in solicitations and contracts when a fixed-price construction contract or a fixed...
48 CFR 2452.251-70 - Contractor employee travel.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor employee travel... 2452.251-70 Contractor employee travel. As prescribed in 2451.7001, insert the following clause in all cost-reimbursement solicitations and contracts involving travel: Contractor Employee Travel (OCT 1999...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-26
... Collection for Contractor Information Gathering, Extension Without Revisions AGENCY: Employment and Training... contractor information gathering and reporting requirements (expiration date November 30, 2012). DATES... Job Corps program is such that many activities required of contractors must be coordinated with other...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-29
... Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration AGENCIES... Procurement Data System (FPDS). Additionally, changes are proposed for the clauses requiring contractor registration in the Central Contractor Registration (CCR) database and DUNS number reporting. DATES: Interested...
76 FR 57807 - Medicaid Program; Recovery Audit Contractors
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... for Medicare & Medicaid Services 42 CFR Part 455 Medicaid Program; Recovery Audit Contractors; Final... 42 CFR Part 455 [CMS-6034-F] RIN 0938-AQ19 Medicaid Program; Recovery Audit Contractors AGENCY... costs of Medicaid Recovery Audit Contractors (Medicaid RACs) and the payment methodology for State...
48 CFR 923.102 - Applicability to contractors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC... 923.102 Applicability to contractors. Many of the Department's major facilities are operated by contractors. Provisions regarding those contracts may be found at Part 970 of this chapter. At other locations...
48 CFR 1652.204-70 - Contractor records retention.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... of FEHBP Clauses 1652.204-70 Contractor records retention. As prescribed in 1604.705 the following clause will be inserted in all FEHB Program contracts. Contractor Records Retention (JUL 2005...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-19
... 0750-AH28 Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security..., entitled ``Contractors Performing Private Security Functions in Areas of Combat Operations or Other... of DoD and other Governmental private security contractors. A clause to cover the interagency...
Code of Federal Regulations, 2011 CFR
2011-01-01
... outside of CSREES to furnish environmental data or documentation to assist CSREES in carrying out its... required to submit environmental data to CSREES, including preparation of an environmental assessment (EA), or when a contractor hired by a grantee or other cooperating party prepares environmental data or...
Code of Federal Regulations, 2014 CFR
2014-01-01
... of NIFA to furnish environmental data or documentation to assist NIFA in carrying out its... required to submit environmental data to NIFA, including preparation of an environmental assessment (EA), or when a contractor hired by a grantee or other cooperating party prepares environmental data or...
45 CFR 95.610 - Submission of advance planning documents.
Code of Federal Regulations, 2012 CFR
2012-10-01
... and implementation; (v) A commitment to conduct/prepare the problem(s) needs assessment, feasibility... statement of the problem/need that the existing capabilities can not resolve, new or changed program..., planning activities/deliverables, State and contractor resource needs, planning project procurement...
45 CFR 95.610 - Submission of advance planning documents.
Code of Federal Regulations, 2013 CFR
2013-10-01
... and implementation; (v) A commitment to conduct/prepare the problem(s) needs assessment, feasibility... statement of the problem/need that the existing capabilities can not resolve, new or changed program..., planning activities/deliverables, State and contractor resource needs, planning project procurement...
45 CFR 95.610 - Submission of advance planning documents.
Code of Federal Regulations, 2014 CFR
2014-10-01
... and implementation; (v) A commitment to conduct/prepare the problem(s) needs assessment, feasibility... statement of the problem/need that the existing capabilities can not resolve, new or changed program..., planning activities/deliverables, State and contractor resource needs, planning project procurement...
Code of Federal Regulations, 2010 CFR
2010-10-01
... a performance work statement or a statement of objectives (see 37.602). (b) Performance-based contracts for services shall include— (1) A performance work statement (PWS); (2) Measurable performance standards (i.e., in terms of quality, timeliness, quantity, etc.) and the method of assessing contractor...
Code of Federal Regulations, 2012 CFR
2012-10-01
... a performance work statement or a statement of objectives (see 37.602). (b) Performance-based contracts for services shall include— (1) A performance work statement (PWS); (2) Measurable performance standards (i.e., in terms of quality, timeliness, quantity, etc.) and the method of assessing contractor...
Code of Federal Regulations, 2014 CFR
2014-10-01
... a performance work statement or a statement of objectives (see 37.602). (b) Performance-based contracts for services shall include— (1) A performance work statement (PWS); (2) Measurable performance standards (i.e., in terms of quality, timeliness, quantity, etc.) and the method of assessing contractor...
Selected DOE Headquarters publications, October 1977-September 1979
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1979-11-01
This sixth issue of cumulative listings of DOE Headquarters publications covers the first two years of the Department's operation (October 1, 1977 - September 30, 1979). It lists two groups of publications issued by then-existing Headquarters organizations and provides an index to their title keywords. The two groups of publications are publications assigned a DOE/XXX-type report number code and Headquarters contractor reports prepared by contractors (and published by DOE) to describe research and development work they have performed for the Department. Certain publications are omitted. They include such items as pamphlets, fact sheets, bulletins, newsletters, and telephone directories, as wellmore » as headquarters publications issued under the DOE-tr (DOE translation) and CONF (conference proceedings) codes, and technical reports from the Jet Propulsion Laboratory and NASA issued under DOE/JPL and DOE/NASA codes. The contents of this issue will not be repeated in subsequent issues of DOE/AD-0010. (RWR)« less
Implementation of Building Information Modeling (BIM) in Construction: A Comparative Case Study
NASA Astrophysics Data System (ADS)
Rowlinson, Steve; Collins, Ronan; Tuuli, Martin M.; Jia, Yunyan
2010-05-01
Building Information Modeling (BIM) approach is increasingly adopted in coordination of construction projects, with a number of parties providing BIM services and software solutions. However, the empirical impact of BIM on construction industry has yet to be investigated. This paper explores the interaction between BIM and the construction industry during its implementation, with a specific focus on the empirical impacts of BIM on the design and construction processes and professional roles during the process. Two cases were selected from recent construction projects coordinated with BIM systems: the Venetian Casino project in Macau and the Cathy Pacific Cargo Terminal project in Hong Kong. The former case illustrates how the conflicts emerged during the design process and procurement were addressed by adopting a BIM approach. The latter demonstrates how the adoption of BIM altered the roles of architect, contractor, and sub-contractors involved in the project. The impacts of BIM were critically reviewed and discussed.
14 CFR 1245.108 - License to contractor.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true License to contractor. 1245.108 Section 1245.108 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PATENTS AND OTHER INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor reporting...
28 CFR 115.77 - Corrective action for contractors and volunteers.
Code of Federal Regulations, 2013 CFR
2013-07-01
... volunteers. 115.77 Section 115.77 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse shall be... other violation of agency sexual abuse or sexual harassment policies by a contractor or volunteer. ...
28 CFR 115.177 - Corrective action for contractors and volunteers.
Code of Federal Regulations, 2014 CFR
2014-07-01
... volunteers. 115.177 Section 115.177 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse shall be prohibited... violation of agency sexual abuse or sexual harassment policies by a contractor or volunteer. ...
28 CFR 115.177 - Corrective action for contractors and volunteers.
Code of Federal Regulations, 2012 CFR
2012-07-01
... volunteers. 115.177 Section 115.177 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse shall be prohibited... violation of agency sexual abuse or sexual harassment policies by a contractor or volunteer. ...
28 CFR 115.77 - Corrective action for contractors and volunteers.
Code of Federal Regulations, 2012 CFR
2012-07-01
... volunteers. 115.77 Section 115.77 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse shall be... other violation of agency sexual abuse or sexual harassment policies by a contractor or volunteer. ...
28 CFR 115.77 - Corrective action for contractors and volunteers.
Code of Federal Regulations, 2014 CFR
2014-07-01
... volunteers. 115.77 Section 115.77 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse shall be... other violation of agency sexual abuse or sexual harassment policies by a contractor or volunteer. ...
28 CFR 115.177 - Corrective action for contractors and volunteers.
Code of Federal Regulations, 2013 CFR
2013-07-01
... volunteers. 115.177 Section 115.177 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse shall be prohibited... violation of agency sexual abuse or sexual harassment policies by a contractor or volunteer. ...
6 CFR 25.8 - Government contractor Defense.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 6 Domestic Security 1 2012-01-01 2012-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification, the...
6 CFR 25.8 - Government contractor Defense.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 6 Domestic Security 1 2013-01-01 2013-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification, the...
48 CFR 252.242-7005 - Contractor business systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: Contractor Business Systems (FEB 2012) (a) This clause only applies to covered...
48 CFR 252.242-7005 - Contractor business systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: Contractor Business Systems (FEB 2012) (a) This clause only applies to covered...
48 CFR 252.242-7005 - Contractor business systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: CONTRACTOR BUSINESS SYSTEMS (MAY 2011) (a) Definitions. As used in this clause...
48 CFR 252.242-7005 - Contractor business systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: Contractor Business Systems (FEB 2012) (a) This clause only applies to covered...
48 CFR 252.237-7023 - Continuation of Essential Contractor Services.
Code of Federal Regulations, 2010 CFR
2010-10-01
... prescribed in 237.7603, use the following clause: Continuation of Mission Essential Functions (Date) (a) The... contractor services in support of mission-essential functions. The contractor-provided services that have been determined to be essential contractor services in support of mission-essential functions are...
40 CFR 35.6600 - Contractor claims.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contractor claims. 35.6600 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6600 Contractor claims. (a) General... prepared by the contractor to support a claim against the recipient; and (4) The award official determines...
75 FR 82575 - Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-30
... 9000-AL60 Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel AGENCY... requirement of collecting from contractors all forms of Government-provided identification once they are no...D Inspector General Audit Report No. D-2009-005, entitled ``Controls Over the Contractor Common...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-17
... of the Chief Information Officer; Submission for OMB Review; Temporary Contractor Information... information collection requirement regarding temporary contractor information worksheet. A notice was... for temporary contractors as a result of the American Recovery and Reinvestment Act of 2009 (Public...