Sample records for automatic storage reclamation

  1. 77 FR 11585 - Notice of Availability of the Aspinall Unit Operations Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... Operations Final Environmental Impact Statement, Wayne N. Aspinall Unit, Colorado River Storage Project... SUMMARY: The Bureau of Reclamation (Reclamation), the Federal agency responsible for operation of the... Aspinall Unit operations, Gunnison and Montrose Counties, Colorado. DATES: Reclamation will not make a...

  2. 43 CFR 418.22 - Future adjustments to Lahontan Reservoir storage targets.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RECLAMATION PROJECT, NEVADA Operations and Management § 418.22 Future adjustments to Lahontan Reservoir storage targets. (a) The Lahontan Reservoir storage targets must be adjusted to accommodate changes in... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Future adjustments to Lahontan Reservoir...

  3. 43 CFR 418.22 - Future adjustments to Lahontan Reservoir storage targets.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... RECLAMATION PROJECT, NEVADA Operations and Management § 418.22 Future adjustments to Lahontan Reservoir storage targets. (a) The Lahontan Reservoir storage targets must be adjusted to accommodate changes in... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Future adjustments to Lahontan Reservoir...

  4. Automated water monitor system field demonstration test report. Volume 2: Technical summary

    NASA Technical Reports Server (NTRS)

    Brooks, R. L.; Jeffers, E. L.; Perreira, J.; Poel, J. D.; Nibley, D.; Nuss, R. H.

    1981-01-01

    The NASA Automatic Water Monitor System was installed in a water reclamation facility to evaluate the technical and cost feasibility of producing high quality reclaimed water. Data gathered during this field demonstration test are reported.

  5. Development and Application of Climate Services for Water Resources Planning and Management within the Department of Interior Bureau of Reclamation

    NASA Astrophysics Data System (ADS)

    Raff, D. A.; Morgan, A.; Brekke, L. D.

    2014-12-01

    The Bureau of Reclamation is the nation's largest wholesale water supplier and the second largest producer of hydropower. Reclamation operates 337 reservoirs with a total storage capacity of 245 million acre-feet and operates 53 hydroelectric powerplants that annually produce, on average for the past 10 years, 40 billion kilowatt-hours. Reclamation is adapting to the impacts and future challenges posed by the changing climate through the development of new climate services as well as through cooperation with Federal, state, local, tribal, academic, and non-governmental partners in the use of climate and water resource information that may be available. Reclamation is utilizing this information within a strategy that has four goals: 1) Increase Water Management Flexibility, 2) Enhance Climate Adaptation Planning, 3) Improve Infrastructure Resiliency, and 4) Expand Information Sharing. Within this presentation we will focus on the utilization of climate services within each of these key goals of Reclamation's strategy. This includes the utilization of climate information to track and potentially improve reservoir management to increase water management flexibility, the development of climate informed hydrology that supports climate adaptation planning, use of climate information to inform decisions of infrastructure resilience, and climate services use for jointly informed water management decisions through education and web based services.

  6. 43 CFR 414.6 - Environmental compliance and funding of Federal costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... RECLAMATION, DEPARTMENT OF THE INTERIOR OFFSTREAM STORAGE OF COLORADO RIVER WATER AND DEVELOPMENT AND RELEASE OF INTENTIONALLY CREATED UNUSED APPORTIONMENT IN THE LOWER DIVISION STATES Water Quality and...

  7. 43 CFR 414.6 - Environmental compliance and funding of Federal costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RECLAMATION, DEPARTMENT OF THE INTERIOR OFFSTREAM STORAGE OF COLORADO RIVER WATER AND DEVELOPMENT AND RELEASE OF INTENTIONALLY CREATED UNUSED APPORTIONMENT IN THE LOWER DIVISION STATES Water Quality and...

  8. 81. AVALON DAM Photographic copy of construction drawing c1908 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    81. AVALON DAM - Photographic copy of construction drawing c1908 (from aperture card located at Bureau of Reclamation, Salt Lake City) UNTITLED DRAWING OF AUTOMATIC FLOOD GATES. GATE DETAILS - Carlsbad Irrigation District, Avalon Dam, On Pecos River, 4 miles North of Carlsbad, Carlsbad, Eddy County, NM

  9. 80. AVALON DAM Photographic copy of construction drawing c1908 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    80. AVALON DAM - Photographic copy of construction drawing c1908 (from aperture card located at Bureau of Reclamation, Salt Lake City). UNTITLED DRAWING OF AUTOMATIC FLOOD GATES. PARTIAL PLAN AND ELEVATION - Carlsbad Irrigation District, Avalon Dam, On Pecos River, 4 miles North of Carlsbad, Carlsbad, Eddy County, NM

  10. Solid Waste Treatment Technology

    ERIC Educational Resources Information Center

    Hershaft, Alex

    1972-01-01

    Advances in research and commercial solid waste handling are offering many more processing choices. This survey discusses techniques of storage and removal, fragmentation and sorting, bulk reduction, conversion, reclamation, mining and mineral processing, and disposal. (BL)

  11. Reclaimed surface mine terrestrial pools: Integrating remote sensing, spatial data and field work

    NASA Astrophysics Data System (ADS)

    Kazar, Sheila A.

    This study investigated the remote sensing of aboveground biomass in reclaimed surface mine reclamation sites and the carbon (C) storage potential of these sites. The research is structured in three sections. In the first study, the potential for utilizing the tasseled cap (TC) spectral transformation to characterize multi-temporal changes of vegetation growth was investigated within nine reclaimed coal surface mines in Monongalia and Preston Counties, West Virginia. The spectral patterns of TC greenness, brightness and wetness values associated with the minesites were investigated for a multi-temporal series of Landsat Thematic Mapper (TM) images, from 1992 to 2007. In general, most of the minesites at the time of mining showed increased brightness, and decreased greenness and wetness, with a reverse of this pattern during reclamation. However, rainfall appears to be a confounding variable, at least for relatively recently reclaimed sites. Spectral change vector analysis (CVA) was found to be effective for summarizing the patterns of change in TC values before and after reclamation. In the second study, field samples were collected from reclaimed grassland minesites and used to estimate biomass and C accumulation. In general, biomass and C increased in the six years following reclamation, and then slowly declined. Three Landsat Thematic Mapper (TM) images, from April, May and September of 2007, were used to assess four vegetation indices (VIs), TC, and red and near infrared radiance for potential for mapping biomass. For the April 3 Landsat image, the vegetation indices were not statistically correlated with field-measured biomass, and nor were the regression models significant. For the May 13 image, TC greenness and EVI were most strongly correlated with biomass, with TC wetness, NDVI, TVI and SAVI all significant at the 0.05 level. A number of regression models that included age since reclamation and spectral indices for May 13 were statistically significant, with the strongest prediction obtained from EVI. For the September 18 image, the correlation of biomass and TC brightness, TM4 and TVI were all statistically significant at the 0.05 level, although regression models that included age since reclamation as a dummy variable were not significant. In the third and final study, the biophysical potential for terrestrial aboveground C storage in minelands reclaimed to grasslands was investigated at the regional and state scale. Although above-ground annual accumulation of C is low in grasslands, if the aboveground biomass were harvested annually, and stored permanently C storage over 20 years on the grasslands of reclaimed minelands in West Virginia could be 3.60-7.32 Tg C, compared to 1.60 -9.80 Tg C if those same sites were reclaimed to forests. Although there is currently only limited usage of harvested hay for purposes that would result in its long-term storage, this study points to the benefits that would accrue if such mechanisms could be developed.

  12. Greenhouse gas emissions and the interrelation of urban and forest sectors in reclaiming one hectare of land in the Pacific Northwest.

    PubMed

    Trlica, Andrew; Brown, Sally

    2013-07-02

    The interrelation between urban areas and land use options for greenhouse gas mitigation was evaluated by assessing the utility of urban residuals for soil reclamation. Long-term impacts on soil C storage for mine lands restored with urban organic residuals were quantified by sampling historic sites reclaimed both conventionally and with residuals-based amendments. Use of amendments resulted in greater C storage compared to conventional practices for all sites sampled, with increases ranging from 14.2 Mg C ha(-1) in a coalmine in WA to 38.4 Mg C ha(-1) for a copper mine in British Columbia. Expressed as Mg C per Mg amendment, effective C increases ranged from 0.03 to 0.31 Mg C per Mg amendment. Results were applied to three alternative land-use scenarios to model the net GHG balance for a site restored to forest or low-density development. The model included construction of 3.9 243 m(2)-homes, typical of urban sprawl. Emissions for home and road construction and use over a 30-year period resulted in net emissions of 1269 Mg CO2. In contrast, conventional reclamation to forestland or reclamation with 100 Mg of residuals resulted in net GHG reductions of -293 and -475 Mg CO2. Construction of an equivalent number of smaller homes in an urban core coupled with restoration of 1 ha with amendments was close to carbon neutral. These results indicate that targeted use of urban residuals for forest reclamation, coupled with high-density development, can increase GHG mitigation across both sectors.

  13. 46 CFR 112.05-5 - Emergency power source.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... generator must be either a diesel engine or a gas turbine. [CGD 74-125A, 47 FR 15267, Apr. 8, 1982, as... power source (automatically connected storage battery or an automatically started generator) 36 hours.1... power source (automatically connected storage battery or an automatically started generator) 8 hours or...

  14. 46 CFR 112.05-5 - Emergency power source.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... generator must be either a diesel engine or a gas turbine. [CGD 74-125A, 47 FR 15267, Apr. 8, 1982, as... power source (automatically connected storage battery or an automatically started generator) 36 hours.1... power source (automatically connected storage battery or an automatically started generator) 8 hours or...

  15. 46 CFR 112.05-5 - Emergency power source.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... with § 112.05-1(c). Table 112.05-5(a) Size of vessel and service Type of emergency power source or... power source (automatically connected storage battery or an automatically started generator) 36 hours.1... power source (automatically connected storage battery or an automatically started generator) 8 hours or...

  16. 46 CFR 112.05-5 - Emergency power source.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... with § 112.05-1(c). Table 112.05-5(a) Size of vessel and service Type of emergency power source or... power source (automatically connected storage battery or an automatically started generator) 36 hours.1... power source (automatically connected storage battery or an automatically started generator) 8 hours or...

  17. 46 CFR 112.05-5 - Emergency power source.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... with § 112.05-1(c). Table 112.05-5(a) Size of vessel and service Type of emergency power source or... power source (automatically connected storage battery or an automatically started generator) 36 hours.1... power source (automatically connected storage battery or an automatically started generator) 8 hours or...

  18. Will the Family Farm Survive in America? Part 1: Federal Reclamation Policy (Westlands Water District). Joint Hearings Before the Select Committee on Small Business and the Committee on Interior and Insular Affairs, U.S. Senate, 94th Congress, 1st Session (July 17 and 22, 1975).

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. Senate Committee on Interior and Insular Affairs.

    The national reclamation program was to encourage people to settle on the land, to enable them to own the land they farmed, and to spread the benefit of subsidized irrigation water to as many independent farm families as possible. The San Luis Unit of the Central Valley Project, the largest pumped water diversion and water storage project, was…

  19. The FLOWS (FAA-Lincoln Laboratory Operational Weather Studies) Automatic Weather Station Network in Operation.

    DTIC Science & Technology

    1987-03-26

    20o, there is little change in observed transmission with further increases in angle. A similar result, obtained by Naegeli (1953) for the small end...Reclamation, June (1983). MacCready, P.J., "Mean Wind Speed Measurements in Turbulence", J. Appl. Meteor., 5, pp. 219-225 (1966). Naegeli , W

  20. Seed reserves diluted during surface soil reclamation in eastern Mojave Desert

    USGS Publications Warehouse

    Scoles-Sciulla, S. J.; DeFalco, L.A.

    2009-01-01

    Surface soil reclamation is used to increase the re-establishment of native vegetation following disturbance through preservation and eventual replacement of the indigenous seed reserves. Employed widely in the mining industry, soil reclamation has had variable success in re-establishing native vegetation in arid and semi-arid regions. We tested whether variable success could be due in part to a decrease of seed reserves during the reclamation process by measuring the change in abundance of germinable seed when surface soil was mechanically collected, stored in a soil pile for 4 months, and reapplied upon completion of a roadway. Overall seed reserve declines amounted to 86% of the original germinable seed in the soil. The greatest decrease in seed reserves occurred during soil collection (79% of original reserves), compared to the storage and reapplication stages. At nearby sites where stored surface soil had been reapplied, no perennial plant cover occurred from 0.5 to 5 years after application and <1% cover after 7 years compared to 5% cover in nearby undisturbed areas. The reduction in abundance of germinable seed during reclamation was primarily due to dilution of seed reserves when deeper soil fractions without seed were mixed with the surface soil during collection. Unless more precise techniques of surface soil collection are utilized, soil reclamation alone as a means for preserving native seed reserves is a method ill-suited for revegetating disturbed soils with a shallow seed bank, such as those found in the Mojave Desert. Copyright ?? Taylor & Francis Group, LLC.

  1. Changing scene highlights III. [Iowa State University

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fassel, V. A.; Harl, Neil E.; Legvold, Sam

    1979-01-01

    The research programs in progress at Ames Laboratory, Iowa State University, are reviewed: hydrogen (storage), materials, catalysts, TRISTAN (their laboratory isotope separator), coal preparation, coal classification, land reclamation (after surface mining, nitinol, neutron radiography, grain dust explosions, biomass conversion, etc). (LTC)

  2. Characterization and reclamation assessment for the Central Shops Diesel Storage Facility, Savannah River Site, Aiken, South Carolina

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fliermans, C.B.; Hazen, T.C.; Bledsoe, H.

    1993-10-01

    The contamination of subsurface terrestrial environments by organic contaminants is a global phenomenon. The remediation of such environments requires innovative assessment techniques and strategies for successful clean-ups. Central Shops Diesel Storage Facility at Savannah River Site was characterized to determine the extent of subsurface diesel fuel contamination using innovative approaches and effective bioremediation techniques for clean-up of the contaminant plume have been established.

  3. Optimal message log reclamation for independent checkpointing

    NASA Technical Reports Server (NTRS)

    Wang, Yi-Min; Fuchs, W. Kent

    1993-01-01

    Independent (uncoordinated) check pointing for parallel and distributed systems allows maximum process autonomy but suffers from possible domino effects and the associated storage space overhead for maintaining multiple checkpoints and message logs. In most research on check pointing and recovery, it was assumed that only the checkpoints and message logs older than the global recovery line can be discarded. It is shown how recovery line transformation and decomposition can be applied to the problem of efficiently identifying all discardable message logs, thereby achieving optimal garbage collection. Communication trace-driven simulation for several parallel programs is used to show the benefits of the proposed algorithm for message log reclamation.

  4. 78 FR 37843 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Panels F and G...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... existing haul road and would deviate only where engineering constraints dictate (i.e., too tight a corner... 20 acres for the temporary storage of chert to be used for reclamation; and (3) utilization of a geo...

  5. 40 CFR 63.1420 - Applicability and designation of affected sources.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Solvent reclamation, recovery, or recycling operations at hazardous waste treatment, storage, and disposal... on a mass basis for two or more products and if one of those products is a polyether polyol, then the... allow the determination of the primary product for the specified period, applicability shall be...

  6. 40 CFR 63.1420 - Applicability and designation of affected sources.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Solvent reclamation, recovery, or recycling operations at hazardous waste treatment, storage, and disposal... on a mass basis for two or more products and if one of those products is a polyether polyol, then the... allow the determination of the primary product for the specified period, applicability shall be...

  7. Automatic mapping of strip mine operations from spacecraft data. [Ohio

    NASA Technical Reports Server (NTRS)

    Rogers, R. H. (Principal Investigator); Reed, L. E.; Pettyjohn, W. A.

    1974-01-01

    The author has identified the following significant results. Computer techniques were applied to process ERTS tapes acquired over coal mining operations in southeastern Ohio on 21 August 1972 and 3 September 1973. ERTS products obtained included geometrically-correct map overlays, at scales from 1:24,000 to 1:250,000, showing stripped earth, partially reclaimed earth, water, and natural vegetation. Computer-generated tables listing the area covered by each land-water category in square kilometers were also produced. By comparing these mapping products, the study demonstrates the capability of ERTS to monitor changes in the extent of stripping and reclamation. NASA C-130 photography acquired on 7 September 1973 when compared with the ERTS products generated from the 3 September 1973 tape established the categorization accuracy to be better than 90%. It is estimated that the stripping and reclamation maps and data were produced from the ERTS CCTs at a tenth of the cost of conventional techniques.

  8. Water monitor system: Phase 1 test report

    NASA Technical Reports Server (NTRS)

    Taylor, R. E.; Jeffers, E. L.

    1976-01-01

    Automatic water monitor system was tested with the objectives of assuring high-quality effluent standards and accelerating the practice of reclamation and reuse of water. The NASA water monitor system is described. Various components of the system, including the necessary sensors, the sample collection system, and the data acquisition and display system, are discussed. The test facility and the analysis methods are described. Test results are reviewed, and recommendations for water monitor system design improvement are presented.

  9. Electrochemical Orbital Energy Storage (ECOES) technology program. [regenerative fuel cell system

    NASA Technical Reports Server (NTRS)

    Mcbryar, H.

    1980-01-01

    The versatility and flexibility of a regenerative fuel cell power and energy storage system is considered. The principal elements of a Regenerative Fuel Cell System combine the fuel cell and electrolysis cell with a photovoltaic solar cell array, along with fluid storage and transfer equipment. The power output of the array (for LEO) must be roughly triple the load requirements of the vehicle since the electrolyzers must receive about double the fuel cell output power in order to regenerate the reactants (2/3 of the array power) while 1/3 of the array power supplies the vehicle base load. The working fluids are essentially recycled indefinitely. Any resupply requirements necessitated by leakage or inefficient reclamation is water - an ideal material to handle and transport. Any variation in energy storage capacity impacts only the fluid storage portion, and the system is insensitive to use of reserve reactant capacity.

  10. Automating usability of ATLAS Distributed Computing resources

    NASA Astrophysics Data System (ADS)

    Tupputi, S. A.; Di Girolamo, A.; Kouba, T.; Schovancová, J.; Atlas Collaboration

    2014-06-01

    The automation of ATLAS Distributed Computing (ADC) operations is essential to reduce manpower costs and allow performance-enhancing actions, which improve the reliability of the system. In this perspective a crucial case is the automatic handling of outages of ATLAS computing sites storage resources, which are continuously exploited at the edge of their capabilities. It is challenging to adopt unambiguous decision criteria for storage resources of non-homogeneous types, sizes and roles. The recently developed Storage Area Automatic Blacklisting (SAAB) tool has provided a suitable solution, by employing an inference algorithm which processes history of storage monitoring tests outcome. SAAB accomplishes both the tasks of providing global monitoring as well as automatic operations on single sites. The implementation of the SAAB tool has been the first step in a comprehensive review of the storage areas monitoring and central management at all levels. Such review has involved the reordering and optimization of SAM tests deployment and the inclusion of SAAB results in the ATLAS Site Status Board with both dedicated metrics and views. The resulting structure allows monitoring the storage resources status with fine time-granularity and automatic actions to be taken in foreseen cases, like automatic outage handling and notifications to sites. Hence, the human actions are restricted to reporting and following up problems, where and when needed. In this work we show SAAB working principles and features. We present also the decrease of human interactions achieved within the ATLAS Computing Operation team. The automation results in a prompt reaction to failures, which leads to the optimization of resource exploitation.

  11. Aquifers in coastal reclaimed lands - real world assessments

    NASA Astrophysics Data System (ADS)

    Saha, A.; Bironne, A.; Vonhögen-Peeters, L.; Lee, W. K.; Babovic, V. M.; Vermeulen, P.; van Baaren, E.; Karaoulis, M.; Blanchais, F.; Nguyen, M.; Pauw, P.; Doornenbal, P.

    2017-12-01

    Climate change and population growth are significant concerns in coastal regions around the world, where more than 30% of the world's population reside. The numbers continue to rise as coastal areas are increasingly urbanized. Urbanization creates land shortages along the coasts, which has spurred coastal reclamation activities as a viable solution. In this study, we focus on these reclamation areas; reclaimed areas in Singapore, and in the Netherlands, and investigate the potential of these reclaimed bodies as artificial aquifers that could attenuate water shortage problems in addition to their original purpose. We compare how the reclamation methods determine the hydrogeological characteristics of these manmade aquifers. We highlight similarities in freshwater lens development in the artificial shallow aquifers under natural recharge under diverse conditions, i.e. tropical and temperate zones, using numerical models. The characteristics and responses of these aquifers with dynamic freshwater-saltwater interface are contrasted against naturally occurring coastal aquifers where equilibrium was disturbed by anthropogenic activities. Finally, we assess the risks associated with subsidence and saltwater intrusion, combining measurements and numerical models, in case these aquifers are planned for Aquifer Storage and Recovery (ASR) or Managed Aquifer Recharge (MAR) strategies. Relative performances of some ASR schemes are simulated and compared in the reclaimed lands.

  12. Slow Dynamics Model of Compressed Air Energy Storage and Battery Storage Technologies for Automatic Generation Control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krishnan, Venkat; Das, Trishna

    Increasing variable generation penetration and the consequent increase in short-term variability makes energy storage technologies look attractive, especially in the ancillary market for providing frequency regulation services. This paper presents slow dynamics model for compressed air energy storage and battery storage technologies that can be used in automatic generation control studies to assess the system frequency response and quantify the benefits from storage technologies in providing regulation service. The paper also represents the slow dynamics model of the power system integrated with storage technologies in a complete state space form. The storage technologies have been integrated to the IEEE 24more » bus system with single area, and a comparative study of various solution strategies including transmission enhancement and combustion turbine have been performed in terms of generation cycling and frequency response performance metrics.« less

  13. Estimation of contamination sources of human enteroviruses in a wastewater treatment and reclamation system by PCR-DGGE.

    PubMed

    Ji, Zheng; Wang, Xiaochang C; Xu, Limei; Zhang, Chongmiao; Funamizu, Naoyuki; Okabe, Satoshi; Sano, Daisuke

    2014-06-01

    A polymerase chain reaction-denaturing gradient gel electrophoresis (PCR-DGGE) method was employed to estimate the contamination sources of human enteroviruses and understand how their dominant strains vary in a wastewater treatment and reclamation system consisting of sewage collection, wastewater treatment with membrane bioreactor and open lakes for reclaimed water storage and reuse. After PCR-DGGE using a selected primer set targeting enteroviruses, phylogenetic analysis of acquired enterovirus gene sequences was performed. Enteroviruses identified from the septic tank were much more diverse than those from grey water and kitchen wastewater. Several unique types of enterovirus different from those in wastewater samples were dominant in a biological wastewater treatment unit. Membrane filtration followed by chlorination was proved effective for physically eliminating enteroviruses; however, secondary contamination likely occurred as the reclaimed water was stored in artificial lakes. Enterovirus 71 (EV71), a hand-foot-and-mouth disease (HFMD) viral pathogen, was detected mainly from the artificial lakes, implying that wastewater effluent was not the contamination source of EV71 and that there were unidentified non-point sources of the contamination with the HFMD viral pathogen in the reclaimed water stored in the artificial lakes. The PCR-DGGE targeting enteroviruses provided robust evidence about viral contamination sources in the wastewater treatment and reclamation system.

  14. Changes in ecosystem service values in Zhoushan Island using remote sensing time series data

    NASA Astrophysics Data System (ADS)

    Zhang, Xiaoping; Qin, Yanpei; Lv, Ying; Zhen, Guangwei; Gong, Fang; Li, Chaokui

    2017-10-01

    The largest inhabited island, Zhoushan Island, is the center of economy, culture, shipping, and fishing in the Zhoushan Archipelago New Area. Its coastal wetland and tidal flats offer significant ecological services including floodwater storage, wildlife habitat, and buffers against tidal surges. Yet, large-scale land reclamation and new land development may dramatically change ecosystem services. In this research, we assess changes in ecosystem service values in Zhoushan Island during 1990-2000-2011. Three LANDSAT TM and/or ETM data sets were used to determine the spatial pattern of land use, and previously published value coefficients were used to calculate the ecosystem service values delivered by each land category. The results show that total value of ecosystem services in Zhoushan Island declined by 11% from 2920.07 billion Yuan to 2609.77 billion Yuan per year between 1990 and 2011. This decrease is largely attributable to the 51% loss of tidal flats. The combined ecosystem service values of woodland, paddy land and tidal flats were over 90% of the total values. The result indicates that future land-use policy should pay attention to the conservation of these ecosystems over uncontrolled reclamation and coastal industrial development, and that further coastal reclamation should be on rigorous environmental impact analyses.

  15. Environmental Compliance Assessment System (USA ECAS)

    DTIC Science & Technology

    1991-09-01

    Fuberidazole 100/10,000 3878-19-1 Fulminic acid , mercu- 10 P065 628-86-4 ry(I1) salt Fumaric acid 5000 110-17-8 Furan, tetrahydro- 1000 LT213 109-99-9 Furan...etc.)? S. Does the installation have any bulk acid storage? 6. Does the installation store batteries and/or have a battery reclamation point? I...gas turbines (greater than 1 MBtuhr) - bulk gasoline terminals - municipal waste combustors - sulfuric and nitric acid plants - rotogravure printers

  16. Automatic water inventory, collecting, and dispensing unit

    NASA Technical Reports Server (NTRS)

    Hall, J. B., Jr.; Williams, E. F.

    1972-01-01

    Two cylindrical tanks with piston bladders and associated components for automatic filling and emptying use liquid inventory readout devices in control of water flow. Unit provides for adaptive water collection, storage, and dispensation in weightlessness environment.

  17. Vacuum distillation: vapor filtered-catalytic oxidation water reclamation system utilizing radioisotopes

    NASA Technical Reports Server (NTRS)

    Honegger, R. J.; Remus, G. A.; Kurg, E. K.

    1971-01-01

    The development of a functional model water reclamation system is discussed. The system produces potable water by distillation from the urine and respiration-perspiration condensate at the normal rate generated by four men. Basic processes employed are vacuum distillation, vapor filtration, vapor phase catalytic oxidation, and condensation. The system is designed to use four 75-watt isotope heaters for distillation thermal input, and one 45-watt isotope for the catalytic oxidation unit. The system is capable of collecting and storing urine, and provides for stabilizing the urine by chemical pretreatment. The functional model system is designed for operation in a weightless condition with liquid-vapor phase separators for the evaporator still, and centrifugal separators for urine collection and vapor condensation. The system provides for storing and dispensing reclaimed potable water. The system operates in a batch mode for 40 days, with urine residues accumulating in the evaporator. The evaporator still and residue are removed to storage and replaced with a fresh still for the next 40-day period.

  18. Technical-economic modelling of integrated water management: wastewater reuse in a French island.

    PubMed

    Xu, P; Valette, F; Brissaud, F; Fazio, A; Lazarova, V

    2001-01-01

    An integrated technical-economic model is used to address water management issues in the French island of Noirmoutier. The model simulates potable water production and supply, potable and non potable water demand and consumption, wastewater collection, treatment and disposal, water storage, transportation and reuse. A variety of water management scenarios is assessed through technical, economic and environmental evaluation. The scenarios include wastewater reclamation and reuse for agricultural and landscape irrigation as well as domestic non potable application, desalination of seawater and brackish groundwater for potable water supply. The study shows that, in Noirmoutier, wastewater reclamation and reuse for crop irrigation is the most cost-effective solution to the lack of water resources and the protection of sensitive environment. Some water management projects which are regarded as having less economic benefit in the short-term may become competitive in the future, as a result of tightened environmental policy, changed public attitudes and advanced water treatment technologies. The model provides an appropriate tool for water resources planning and management.

  19. [The present status and development of thermal control system of spacesuits for extravehicular activity].

    PubMed

    Zhao, C Y; Sun, J B; Yuan, X G

    1999-04-01

    With the extension of extravehicular activity (EVA) duration, the need for more effective thermal control of EVA spacesuits is required. The specific schemes investigated in heat sink system for EVA are discussed, including radiator, ice storage, metal hydride heat pump, phase-change storage/radiator and sublimator. The importance and requirements of automatic thermal control for EVA are also discussed. Existed automatic thermal control for EVA are reviewed. Prospects of further developments of thermal control of spacesuits for EVA are proposed.

  20. The Oklahoma Geographic Information Retrieval System

    NASA Technical Reports Server (NTRS)

    Blanchard, W. A.

    1982-01-01

    The Oklahoma Geographic Information Retrieval System (OGIRS) is a highly interactive data entry, storage, manipulation, and display software system for use with geographically referenced data. Although originally developed for a project concerned with coal strip mine reclamation, OGIRS is capable of handling any geographically referenced data for a variety of natural resource management applications. A special effort has been made to integrate remotely sensed data into the information system. The timeliness and synoptic coverage of satellite data are particularly useful attributes for inclusion into the geographic information system.

  1. Automatic rapid attachable warhead section

    DOEpatents

    Trennel, A.J.

    1994-05-10

    Disclosed are a method and apparatus for automatically selecting warheads or reentry vehicles from a storage area containing a plurality of types of warheads or reentry vehicles, automatically selecting weapon carriers from a storage area containing at least one type of weapon carrier, manipulating and aligning the selected warheads or reentry vehicles and weapon carriers, and automatically coupling the warheads or reentry vehicles with the weapon carriers such that coupling of improperly selected warheads or reentry vehicles with weapon carriers is inhibited. Such inhibition enhances safety of operations and is achieved by a number of means including computer control of the process of selection and coupling and use of connectorless interfaces capable of assuring that improperly selected items will be rejected or rendered inoperable prior to coupling. Also disclosed are a method and apparatus wherein the stated principles pertaining to selection, coupling and inhibition are extended to apply to any item-to-be-carried and any carrying assembly. 10 figures.

  2. Automatic rapid attachable warhead section

    DOEpatents

    Trennel, Anthony J.

    1994-05-10

    Disclosed are a method and apparatus for (1) automatically selecting warheads or reentry vehicles from a storage area containing a plurality of types of warheads or reentry vehicles, (2) automatically selecting weapon carriers from a storage area containing at least one type of weapon carrier, (3) manipulating and aligning the selected warheads or reentry vehicles and weapon carriers, and (4) automatically coupling the warheads or reentry vehicles with the weapon carriers such that coupling of improperly selected warheads or reentry vehicles with weapon carriers is inhibited. Such inhibition enhances safety of operations and is achieved by a number of means including computer control of the process of selection and coupling and use of connectorless interfaces capable of assuring that improperly selected items will be rejected or rendered inoperable prior to coupling. Also disclosed are a method and apparatus wherein the stated principles pertaining to selection, coupling and inhibition are extended to apply to any item-to-be-carried and any carrying assembly.

  3. Segmentation, dynamic storage, and variable loading on CDC equipment

    NASA Technical Reports Server (NTRS)

    Tiffany, S. H.

    1980-01-01

    Techniques for varying the segmented load structure of a program and for varying the dynamic storage allocation, depending upon whether a batch type or interactive type run is desired, are explained and demonstrated. All changes are based on a single data input to the program. The techniques involve: code within the program to suppress scratch pad input/output (I/O) for a batch run or translate the in-core data storage area from blank common to the end-of-code+1 address of a particular segment for an interactive run; automatic editing of the segload directives prior to loading, based upon data input to the program, to vary the structure of the load for interactive and batch runs; and automatic editing of the load map to determine the initial addresses for in core data storage for an interactive run.

  4. Effect of egg freshness on their automatic orientation.

    PubMed

    Jiang, Song; Zhu, Ticao; Jia, Danfeng; Yao, Jun; Jiang, Yiyi

    2018-05-01

    High-quality eggs in unified packaging are desired by egg production enterprises. Automatic orientation apparatus is frequently used to orient eggs uniformly to pointed-end-down position for packaging. However, such apparatus may not work accordingly if the eggs are stored under improper methods or for excessive storage time. To study the effect of egg freshness on the efficiency of automatic orientation process, the relationship between egg freshness and its orientation motions was investigated under different storage conditions. The results showed that as the storage time increased, centroid position and pointed-end-down turnover ratio decreased; other parameters such as eggs' obliquity at stationary state, horizontal deflection angle, speed, acceleration of axial motion, side-slip angle and rolling distance increased. However, the effects of storage time on the guiding distance of the guide rod were not apparent. In addition, the higher the storage temperature, the greater the changes of the final orientation states of eggs on the conveyor line. If the eggs were to be oriented uniformly, they should be stored for less than 25, 16, 10 and 7 days at 10 °C, 18 °C, 26 °C and 34 °C, respectively, under a relative humidity of 75%. The experimental results presented in this paper are very useful for quality control and quality assurance in egg production enterprises. © 2017 Society of Chemical Industry. © 2017 Society of Chemical Industry.

  5. Assessment of Coastal Ecosystem Services for Conservation Strategies in South Korea.

    PubMed

    Chung, Min Gon; Kang, Hojeong; Choi, Sung-Uk

    2015-01-01

    Despite the fact that scientific and political consideration for ecosystem services has dramatically increased over the past decade, few studies have focused on marine and coastal ecosystem services for conservation strategies. We used an ecosystem services approach to assess spatial distributions of habitat risks and four ecosystem services (coastal protection, carbon storage, recreation, and aesthetic quality), and explored the tradeoffs among them in coastal areas of South Korea. Additionally, we analyzed how the social and ecological characteristics in coastal areas interact with conservation and development policies by using this approach. We found strong negative associations between the habitat risks and ecosystem services (aquaculture, carbon storage, recreation, and aesthetic quality) across the coastal counties. Our results showed that the intensity of the habitat risks and the provision of ecosystem services were significantly different between reclamation-dominated and conservation-dominated counties, except for coastal vulnerability. A generalized linear model suggested that reclamation projects were dependent on economic efficiency, whereas demographic pressures and habitat conditions influenced the designation of protected areas at a county level. The ecosystem services approach provided guidelines to achieve both sustainable development and environment conservation. By using the approach, we can select the priority areas for developments while we can minimize the degradation of biodiversity and ecosystem services. As cultural ecosystem services are evenly distributed throughout coastal areas of South Korea, decision makers may employ them to improve the conditions of coastal wetlands outside of protected areas.

  6. Assessment of Coastal Ecosystem Services for Conservation Strategies in South Korea

    PubMed Central

    Chung, Min Gon; Kang, Hojeong; Choi, Sung-Uk

    2015-01-01

    Despite the fact that scientific and political consideration for ecosystem services has dramatically increased over the past decade, few studies have focused on marine and coastal ecosystem services for conservation strategies. We used an ecosystem services approach to assess spatial distributions of habitat risks and four ecosystem services (coastal protection, carbon storage, recreation, and aesthetic quality), and explored the tradeoffs among them in coastal areas of South Korea. Additionally, we analyzed how the social and ecological characteristics in coastal areas interact with conservation and development policies by using this approach. We found strong negative associations between the habitat risks and ecosystem services (aquaculture, carbon storage, recreation, and aesthetic quality) across the coastal counties. Our results showed that the intensity of the habitat risks and the provision of ecosystem services were significantly different between reclamation-dominated and conservation-dominated counties, except for coastal vulnerability. A generalized linear model suggested that reclamation projects were dependent on economic efficiency, whereas demographic pressures and habitat conditions influenced the designation of protected areas at a county level. The ecosystem services approach provided guidelines to achieve both sustainable development and environment conservation. By using the approach, we can select the priority areas for developments while we can minimize the degradation of biodiversity and ecosystem services. As cultural ecosystem services are evenly distributed throughout coastal areas of South Korea, decision makers may employ them to improve the conditions of coastal wetlands outside of protected areas. PMID:26221950

  7. 48 CFR 252.239-7018 - Supply chain risk.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subsystem(s) of equipment, that is used in the automatic acquisition, storage, analysis, evaluation..., ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for... of a computer, software, firmware and similar procedures, services (including support services), and...

  8. Monitoring and analysis of coastal reclamation from 1995-2015 in Tianjin Binhai New Area, China.

    PubMed

    Chen, Wengang; Wang, Dongchuan; Huang, Yong; Chen, Liding; Zhang, Lihui; Wei, Xiangwang; Sang, Mengqin; Wang, Feicui; Liu, Jinya; Hu, Bingxu

    2017-06-20

    Increasing coastal reclamation activities have been undertaken to solve the conflict between people and land resources, creating significant challenges for coordinating coastal reclamation, economic development and environmental protection. This paper analyzes the effects of coast reclamation on Gross Domestic Product growth and the quality of inshore seawater in the Tianjin Binhai New Area. Remote sensing and a Geographic Information System were used to extract the information of coastal reclamation. The correlation between the area of coastal reclamation, GDP growth and the quality of inshore seawater was analyzed and a decoupling elasticity model was used to explore trends in the relationship between economic development and coastal reclamation. Results showed that coastal reclamation activities played an important role in promoting economic development, but greatly damaged the ecological environment. Although the relationship between coastal reclamation and economic development has weakened during the last three periods, the influence on the environment will continue because of the cumulative effects of pollution. To maintain a balance between coastal reclamation, economic development and environmental protection, (1) coastal reclamation planning must address both economic and environmental outcomes; (2) environmental deficiencies from existing coastal reclamation projects must be rectified; and (3) the legal system regulating coastal reclamation needs to be refined and strengthened.

  9. 39 CFR 255.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of which is not the acquisition, storage, manipulation, management, movement, control, display... of equipment, that is used in the automatic acquisition, storage, manipulation, management, movement... agency can demonstrate would result in a fundamental alteration in its nature; or (2) With respect to any...

  10. [Effects of Land Use Type on Soil Microbial Biomass Carbon and Nitrogen in Water-Stable Aggregates in Jinyun Mountain].

    PubMed

    Li, Zeng-quan; Jiang, Chang-sheng; Hao, Qing-ju

    2015-11-01

    In this study, four land use types including subtropical evergreen broad-leaved forest (abbreviation: forest), sloping farmland, orchard and abandoned land were selected to collect soil samples from 0 to 60 cm depth at the same altitude in Jinyun Mountain. Four sizes of large macroaggregates (> 2 mm), small macroaggregates (0.25-2 mm), microaggregates (0.053-0.25 mm) and silt + clay (< 0.053 mm) were achieved by wet sieving method and the contents of microbial biomass carbon (MBC) and microbial biomass nitrogen (MBN) in each aggregate fraction were measured to study the impacts of the different land use types on MBC and MBN in soil aggregates. The results showed that the contents of MBC and MBN in all aggregates in the four land use types decreased with the increasing soil depth. Except large macroaggregetes, the contents of MBC and MBN in the other three soil aggregates decreased when the forest was reclamated into orchard and sloping farmland. MBC and MBN contents in large macroaggregates, small macroaggregates and microaggregates all increased when the sloping farmland was abandoned. The storages of organic carbon and nitrogen in soil depth of 0-60 cm in the four proportions were calculated by the equivalent soil mass method. The results revealed that MBC storages in the other three sizes except silt + clay were higher in the forest than those in orchard and sloping land. And MBC storages in the all aggregates were higher in the abandoned land than those in the sloping land. MBN storages in small macroaggregates and microaggregates were higher in the forest than those in orchard and sloping land. And MBN storages in the other three aggregates except silt + clay were higher in the abandoned land than those in the sloping land. Generally speaking, the storages of MBC in soil aggregates of forest and abandoned land were higher than in orchard and sloping land, MBN storage in soil aggregates of forest was nearly equal to the storage in orchard. However, the storages of MBN in soil aggregates of forest and abandoned land were higher than those in sloping land. The results showed that the reclamation of the forest resulted in the loss of MBC and MBN in soil aggregates of sloping land. However, the abandon of the sloping land contributed to the acumulation of MBC and MBN in soil aggregates. In the process of land use change, the direction and quantity of change in MBC in the soil aggregates were not consistent with those of the total soil organic carbon, which meant the microbial quotient in soil aggregates was not suitable for using to evaluate the impact of land use change on soil quality, using the total organic carbon as an index to express the sensitivity of the land use change may be better.

  11. 76 FR 12852 - Louisiana Regulatory Program/Abandoned Mine Land Reclamation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 918... Reclamation Plan AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are...

  12. 75 FR 60373 - Louisiana Regulatory Program/Abandoned Mine Land Reclamation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 918... Reclamation Plan AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule... of Surface Mining Reclamation and Enforcement (OSM), are announcing receipt of a proposed amendment...

  13. Scalable and Manageable Storage Systems

    DTIC Science & Technology

    2000-12-01

    Despite our long- distance relationship, my brothers and sisters, Charfeddine, Amel, Ghazi, Hajer, Nabeel , and Ines overwhelmed me with more love and...that enable storage sys - tems to be more cost-effectively scalable. Furthermore, the dissertation proposes an approach to ensure automatic load...and addresses three key technical challenges to making storage sys - tems more cost-effectively scalable and manageable. 1.2 Dissertation research The

  14. 30 CFR 780.27 - Reclamation plan: Surface mining near underground mining.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RECLAMATION AND OPERATION PLAN § 780.27 Reclamation plan: Surface mining near underground mining. For surface... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reclamation plan: Surface mining near... ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL...

  15. 43 CFR 429.33 - What are the consequences for using Reclamation land, facilities, and waterbodies without...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Reclamation land, facilities, and waterbodies without authorization? 429.33 Section 429.33 Public Lands... BUREAU OF RECLAMATION LAND, FACILITIES, AND WATERBODIES Prohibited and Unauthorized Uses of Reclamation Land, Facilities, and Waterbodies § 429.33 What are the consequences for using Reclamation land...

  16. 76 FR 76104 - Arkansas Regulatory Program and Abandoned Mine Land Reclamation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 904... Reclamation Plan AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation and...

  17. 77 FR 55430 - Arkansas Regulatory Program and Abandoned Mine Land Reclamation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-10

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 904... Reclamation Plan AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation and...

  18. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Reclamation law enforcement policy. 422.3..., DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.3 Reclamation law enforcement policy. The law enforcement policy of Reclamation is: (a) To maintain an accountable...

  19. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Reclamation law enforcement policy. 422.3..., DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.3 Reclamation law enforcement policy. The law enforcement policy of Reclamation is: (a) To maintain an accountable...

  20. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Reclamation law enforcement policy. 422.3..., DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.3 Reclamation law enforcement policy. The law enforcement policy of Reclamation is: (a) To maintain an accountable...

  1. 43 CFR 3601.40 - Mining and reclamation plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Mining and reclamation plans. 3601.40... Materials Disposal; General Provisions Mining and Reclamation Plans § 3601.40 Mining and reclamation plans. BLM may require you to submit mining and reclamation plans before we begin any environmental review or...

  2. 32 CFR 2001.30 - Automatic declassification.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... transferred in conjunction with a transfer of functions, and not merely for storage, the receiving agency... contamination by a hazardous substance; and (iii) Electronic media if the media is subject to issues of software... the automatic declassification of a specific series of records as defined in section 6.1(r) of the...

  3. 32 CFR 2001.30 - Automatic declassification.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... transferred in conjunction with a transfer of functions, and not merely for storage, the receiving agency... contamination by a hazardous substance; and (iii) Electronic media if the media is subject to issues of software... the automatic declassification of a specific series of records as defined in section 6.1(r) of the...

  4. 32 CFR 2001.30 - Automatic declassification.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... transferred in conjunction with a transfer of functions, and not merely for storage, the receiving agency... contamination by a hazardous substance; and (iii) Electronic media if the media is subject to issues of software... the automatic declassification of a specific series of records as defined in section 6.1(r) of the...

  5. 32 CFR 2001.30 - Automatic declassification.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... transferred in conjunction with a transfer of functions, and not merely for storage, the receiving agency... contamination by a hazardous substance; and (iii) Electronic media if the media is subject to issues of software... the automatic declassification of a specific series of records as defined in section 6.1(r) of the...

  6. 32 CFR 2001.30 - Automatic declassification.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... transferred in conjunction with a transfer of functions, and not merely for storage, the receiving agency... contamination by a hazardous substance; and (iii) Electronic media if the media is subject to issues of software... the automatic declassification of a specific series of records as defined in section 6.1(r) of the...

  7. 49 CFR 230.89 - Reverse gear.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the main reservoir air pressure. The operating valve handle for such connection shall be conveniently... automatically prevent loss of pressure in event of failure of the main reservoir air pressure. (c) Power reverse... automatically prevent the loss of pressure in the event of a failure of main air pressure and have storage...

  8. 49 CFR 230.89 - Reverse gear.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the main reservoir air pressure. The operating valve handle for such connection shall be conveniently... automatically prevent loss of pressure in event of failure of the main reservoir air pressure. (c) Power reverse... automatically prevent the loss of pressure in the event of a failure of main air pressure and have storage...

  9. 49 CFR 230.89 - Reverse gear.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the main reservoir air pressure. The operating valve handle for such connection shall be conveniently... automatically prevent loss of pressure in event of failure of the main reservoir air pressure. (c) Power reverse... automatically prevent the loss of pressure in the event of a failure of main air pressure and have storage...

  10. 49 CFR 230.89 - Reverse gear.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the main reservoir air pressure. The operating valve handle for such connection shall be conveniently... automatically prevent loss of pressure in event of failure of the main reservoir air pressure. (c) Power reverse... automatically prevent the loss of pressure in the event of a failure of main air pressure and have storage...

  11. Remote sensing application to regional activities

    NASA Technical Reports Server (NTRS)

    Shahrokhi, F.; Jones, N. L.; Sharber, L. A.

    1976-01-01

    Two agencies within the State of Tennessee were identified whereby the transfer of aerospace technology, namely remote sensing, could be applied to their stated problem areas. Their stated problem areas are wetland and land classification and strip mining studies. In both studies, LANDSAT data was analyzed with the UTSI video-input analog/digital automatic analysis and classification facility. In the West Tennessee area three land-use classifications could be distinguished; cropland, wetland, and forest. In the East Tennessee study area, measurements were submitted to statistical tests which verified the significant differences due to natural terrain, stripped areas, various stages of reclamation, water, etc. Classifications for both studies were output in the form of maps of symbols and varying shades of gray.

  12. History of the Federal Interagency Sedimentation Project

    USGS Publications Warehouse

    Skinner, John V.

    1989-01-01

    Since 1939, the date of the Project's inception, the team has operated under the direction of two lead agencies - the U.S. Geological Survey and U.S. Army Corps of Engineers. The supporting agencies are the Agricultural Research Service, Bureau of Reclamation, U.S. Forest Service, Bureau of Land Management, Federal Highway Administration, and the Tennessee Valley Authority. Overall direction of the Project rests with the Subcommittee on Sedimentation, Interagency Advisory Committee on Water Data. The Project's goals focus on improving and maintaining the quality of fluvial sediment data by (1) developing sediment samplers, laboratory analyzers, and automatic gages (2) evaluating methods, (3) standardizing equipment and methods and (4) procuring, calibrating and selling equipment.

  13. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What is the Reclamation Rural Water Supply... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the Reclamation Rural Water Supply Program? This program addresses domestic, municipal, and industrial water...

  14. 30 CFR 914.25 - Approval of Indiana abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 26, 1994 Emergency response reclamation program. July 23, 1997 March 16, 1998 Indiana plan §§ 884.13... reclamation plan amendments. 914.25 Section 914.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE INDIANA § 914.25 Approval of Indiana abandoned mine land reclamation plan amendments. The...

  15. 30 CFR 914.25 - Approval of Indiana abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 26, 1994 Emergency response reclamation program. July 23, 1997 March 16, 1998 Indiana plan §§ 884.13... reclamation plan amendments. 914.25 Section 914.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE INDIANA § 914.25 Approval of Indiana abandoned mine land reclamation plan amendments. The...

  16. 30 CFR 914.25 - Approval of Indiana abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 26, 1994 Emergency response reclamation program. July 23, 1997 March 16, 1998 Indiana plan §§ 884.13... reclamation plan amendments. 914.25 Section 914.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE INDIANA § 914.25 Approval of Indiana abandoned mine land reclamation plan amendments. The...

  17. VOLUMETRIC LEAK DETECTION IN LARGE UNDERGROUND STORAGE TANKS - VOLUME I

    EPA Science Inventory

    A set of experiments was conducted to determine whether volumetric leak detection system presently used to test underground storage tanks (USTs) up to 38,000 L (10,000 gal) in capacity could meet EPA's regulatory standards for tank tightness and automatic tank gauging systems whe...

  18. INFORMATION STORAGE AND RETRIEVAL, REPORTS ON EVALUATION PROCEDURES AND RESULTS 1965-1967.

    ERIC Educational Resources Information Center

    SALTON, GERALD

    A DETAILED ANALYSIS OF THE RETRIEVAL EVALUATION RESULTS OBTAINED WITH THE AUTOMATIC SMART DOCUMENT RETRIEVAL SYSTEM FOR DOCUMENT COLLECTIONS IN THE FIELDS OF AERODYNAMICS, COMPUTER SCIENCE, AND DOCUMENTATION IS GIVEN IN THIS REPORT. THE VARIOUS COMPONENTS OF FULLY AUTOMATIC DOCUMENT RETRIEVAL SYSTEMS ARE DISCUSSED IN DETAIL, INCLUDING THE FORMS OF…

  19. Isotopic (d18O/d2H) integrity of water samples collected and stored by automatic samplers

    USDA-ARS?s Scientific Manuscript database

    Stable water isotopes are increasingly becoming part of routine monitoring programs that utilize automatic samplers. The objectives of this study were to quantify the uncertainty in isotope signatures due to the length of sample storage (1-24 d) inside autosamplers over a range of air temperatures (...

  20. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false What is the Reclamation Rural Water Supply Program? 404.3 Section 404.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the Reclamation Rural Water Supply Program?...

  1. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true What is the Reclamation Rural Water Supply Program? 404.3 Section 404.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the Reclamation Rural Water Supply Program?...

  2. Temporal-spatial variations and driving factors analysis of coastal reclamation in China

    NASA Astrophysics Data System (ADS)

    Meng, Weiqing; Hu, Beibei; He, Mengxuan; Liu, Baiqiao; Mo, Xunqiang; Li, Hongyuan; Wang, Zhongliang; Zhang, Yu

    2017-05-01

    Coastal reclamation is the gain of land from the sea or coastal wetlands for agricultural purposes, industrial use or port expansions. Large-scale coastal land reclamation can have adverse effects on the coastal environment, including loss of marine habitats and deterioration of coastal water quality. In recent decades, coastal land reclamation has occurred extensively to meet the increasing needs of rapid economic development and urbanization in China. The overall objective of this study is to understand the coastal reclamation status of China from 1979 to 2014 and analyzed its driving factors for mitigating negative ecological effects. The data of coastal reclamation were done with the ERDAS Imagine V9.2 platform and ArcGIS software based on remote images including Landsat, SPOT, ZY-2 and ZY-3. Potential driving factors for sea reclamation were selected based on statistics bulletins and the knowledge of experts in coastal management. In order to understand the relationships among possible impact factors and coastal reclamation, the Partial Least-Squares Regression models was constructed. The analysis results indicated that the total area of reclamation was 11162.89 km2 based on remote sensing images between 1979 and 2014. Shandong Province is the largest reclamation area, reaching 2736.54 km2, and the reclamation is mainly concentrated in Zhejiang, Jiangsu and Liaoning, where the reclamation areas were all more than 1000 km2. According to the remote sensing images, there are three coastal reclamation hotspot regions including Bohai bay (in which is located Liaoning, Tianjin and Hebei), Jiangsu province coastal area and Hangzhou bay (in Zhejiang province). A large scale land reclamation plan of more than 5880 km2 has been made by local government and 2469 km2 has approved by the State Council. From the analyzed results, there is a significant collinearity between these indicators, and no significant correlation between the area of reclamation and selected indicators. Economic development and employees in marine industries have weak positive correlation and correspondingly, the area of cultivated land (ACL) had a negative correlation. Because of the weak correlation, there is an assumption that economic development, outcome of coastal reclamation and population growth were not only was the direct driving factor, but also the outcome of coastal reclamation and population growth was not the direct driving indicator. Construction land quota and huge economic returns to local government may be the direct driving factors according to our field investigation. To resolve the contradiction between the need for land and coastal wetland conservation, it is recommended that China should establish a special management agency and coordination mechanisms, reconsidered the implementation of the reclamation plans and projects that have been approved, enhance law enforcement and increase penalties and strengthen public participation in reclamation management.

  3. Quantification of intensive hybrid coastal reclamation for revealing its impacts on macrozoobenthos

    NASA Astrophysics Data System (ADS)

    Yan, Jiaguo; Cui, Baoshan; Zheng, Jingjing; Xie, Tian; Wang, Qing; Li, Shanze

    2015-01-01

    Managing and identifying the sources of anthropogenic stress in coastal wetlands requires an in-depth understanding of relationships between species diversity and human activities. Empirical and experimental studies provide clear evidence that coastal reclamation can have profound impacts on marine organisms, but the focus of such studies is generally on comparative or laboratory research. We developed a compound intensity index (reclamation intensity index, RI) on hybrid coastal reclamation, to quantify the impacts of reclamation on coastal ecosystems. We also made use of mean annual absolute changes to a number of biotic variables (biodiversity, species richness, biomass of total macrozoobenthos, and species richness and biomass of Polychaeta, Mollusca, Crustacea, and Echinodermata) to determine Hedges’d index, which is a measure of the potential effects of coastal reclamation. Our results showed that there was significant difference of coastal reclamation intensity between Yellow Sea, East China Sea and South China Sea, the biological changes in effect sizes of the three regions differed greatly over time. Our modelling analyses showed that hybrid coastal reclamation generally had significant negative impacts on species diversity and biomass of macrozoobenthos. These relationships varied among different taxonomic groups and included both linear and nonlinear relationships. The results indicated that a high-intensity of coastal reclamation contributed to a pronounced decline in species diversity and biomass, while lower-intensity reclamation, or reclamation within certain thresholds, resulted in a small increase in species diversity and biomass. These results have important implications for biodiversity conservation and the ecological restoration of coastal wetlands in face of the intensive reclamation activities.

  4. Study on the extraction method of tidal flat area in northern Jiangsu Province based on remote sensing waterlines

    NASA Astrophysics Data System (ADS)

    Zhang, Yuanyuan; Gao, Zhiqiang; Liu, Xiangyang; Xu, Ning; Liu, Chaoshun; Gao, Wei

    2016-09-01

    Reclamation caused a significant dynamic change in the coastal zone, the tidal flat zone is an unstable reserve land resource, it has important significance for its research. In order to realize the efficient extraction of the tidal flat area information, this paper takes Rudong County in Jiangsu Province as the research area, using the HJ1A/1B images as the data source, on the basis of previous research experience and literature review, the paper chooses the method of object-oriented classification as a semi-automatic extraction method to generate waterlines. Then waterlines are analyzed by DSAS software to obtain tide points, automatic extraction of outer boundary points are followed under the use of Python to determine the extent of tidal flats in 2014 of Rudong County, the extraction area was 55182hm2, the confusion matrix is used to verify the accuracy and the result shows that the kappa coefficient is 0.945. The method could improve deficiencies of previous studies and its available free nature on the Internet makes a generalization.

  5. 43 CFR 426.25 - Reclamation audits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Reclamation audits. 426.25 Section 426.25... INTERIOR ACREAGE LIMITATION RULES AND REGULATIONS § 426.25 Reclamation audits. Reclamation will conduct... reviews; (b) In-depth reviews; and (c) Audits. ...

  6. Bureau of Reclamation Hydropower Lease of Power Privilege: Case Studies and Considerations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Curtis, Taylor L.; Levine, Aaron L.; McLaughlin, Kathleen

    This report analyzes the U.S. Bureau of Reclamation's (Reclamation) lease of power privilege (LOPP) regulatory process for a nonfederal entity to use a Reclamation jurisdictional dam or conduit for power generation. Recent federal initiatives encouraging hydropower development at federally-owned facilities coupled with Reclamation's hydroelectric potential has led to an increased interest in powering Reclamation dams and conduits through the LOPP process. During the last five years, 23 of the 36 total LOPP projects (76 MW) have been initiated and are at some phase of the development process. Resource assessments analyzed in this report identify over 360 MW of hydroelectric potentialmore » at Reclamation-owned dams and conduits. This report provides considerations from Reclamation staff involved in the LOPP regulatory process and developers that have received an LOPP and are currently generating hydropower at a Reclamation dam or conduit. The authors also analyze LOPP regulatory processing timelines before and after the implementation of federal initiatives to streamline the LOPP process and provide case studies of hydropower projects that have obtained an LOPP.« less

  7. Management of natural resources through automatic cartographic inventory

    NASA Technical Reports Server (NTRS)

    Rey, P.; Gourinard, Y.; Cambou, F. (Principal Investigator)

    1973-01-01

    The author has identified the following significant results. Significant results of the ARNICA program from August 1972 - January 1973 have been: (1) establishment of image to object correspondence codes for all types of soil use and forestry in northern Spain; (2) establishment of a transfer procedure between qualitative (remote identification and remote interpretation) and quantitative (numerization, storage, automatic statistical cartography) use of images; (3) organization of microdensitometric data processing and automatic cartography software; and (4) development of a system for measuring reflectance simultaneous with imagery.

  8. Automatic control of electric thermal storage (heat) under real-time pricing. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daryanian, B.; Tabors, R.D.; Bohn, R.E.

    1995-01-01

    Real-time pricing (RTP) can be used by electric utilities as a control signal for responsive demand-side management (DSM) programs. Electric thermal storage (ETS) systems in buildings provide the inherent flexibility needed to take advantage of variations in prices. Under RTP, optimal performance for ETS operations is achieved under market conditions where reductions in customers` costs coincide with the lowering of the cost of service for electric utilities. The RTP signal conveys the time-varying actual marginal cost of the electric service to customers. The RTP rate is a combination of various cost components, including marginal generation fuel and maintenance costs, marginalmore » costs of transmission and distribution losses, and marginal quality of supply and transmission costs. This report describes the results of an experiment in automatic control of heat storage systems under RTP during the winter seasons of 1989--90 and 1990--91.« less

  9. 43 CFR 404.33 - How much Federal funding can Reclamation provide for the completion of a feasibility study?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.33 How much Federal funding can Reclamation provide for the completion...

  10. 43 CFR 404.30 - How much Federal funding can Reclamation provide for the completion of an appraisal investigation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.30 How much Federal funding can Reclamation provide for the completion...

  11. 43 CFR 404.32 - Can Reclamation reduce the non-Federal cost-share required for an appraisal investigation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.32 Can Reclamation reduce the non-Federal cost-share required for an...

  12. 43 CFR 404.43 - What process will Reclamation follow to determine if an appraisal investigation is ready for review?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Appraisal Investigations § 404.43 What process will Reclamation follow to determine if an...

  13. 43 CFR 404.48 - What process will Reclamation follow to determine if a feasibility study is ready for review?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.48 What process will Reclamation follow to determine if a...

  14. Automatic Dictionary Construction; Part II of Scientific Report No. ISR-18, Information Storage and Retrieval...

    ERIC Educational Resources Information Center

    Cornell Univ., Ithaca, NY. Dept. of Computer Science.

    Part Two of the eighteenth report on Salton's Magical Automatic Retriever of Texts (SMART) project is composed of three papers: The first: "The Effect of Common Words and Synonyms on Retrieval Performance" by D. Bergmark discloses that removal of common words from the query and document vectors significantly increases precision and that…

  15. Automatic Content Analysis; Part I of Scientific Report No. ISR-18, Information Storage and Retrieval...

    ERIC Educational Resources Information Center

    Cornell Univ., Ithaca, NY. Dept. of Computer Science.

    Four papers are included in Part One of the eighteenth report on Salton's Magical Automatic Retriever of Texts (SMART) project. The first paper: "Content Analysis in Information Retrieval" by S. F. Weiss presents the results of experiments aimed at determining the conditions under which content analysis improves retrieval results as well…

  16. Large-Scale Wireless Temperature Monitoring System for Liquefied Petroleum Gas Storage Tanks.

    PubMed

    Fan, Guangwen; Shen, Yu; Hao, Xiaowei; Yuan, Zongming; Zhou, Zhi

    2015-09-18

    Temperature distribution is a critical indicator of the health condition for Liquefied Petroleum Gas (LPG) storage tanks. In this paper, we present a large-scale wireless temperature monitoring system to evaluate the safety of LPG storage tanks. The system includes wireless sensors networks, high temperature fiber-optic sensors, and monitoring software. Finally, a case study on real-world LPG storage tanks proves the feasibility of the system. The unique features of wireless transmission, automatic data acquisition and management, local and remote access make the developed system a good alternative for temperature monitoring of LPG storage tanks in practical applications.

  17. 43 CFR 404.34 - Can Reclamation reduce the amount of non-Federal cost-share required for a feasibility study?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.34 Can Reclamation reduce the amount of non-Federal cost-share required...

  18. A look at trees and reclamation in Georgia

    Treesearch

    Sanford P. Darby

    1980-01-01

    The author briefly reviews Georgia's land reclamation requirements when rehabilitating mined lands with trees as one's reclamation objective. Techniques used to establish two plantations are used to raise several important issues which, if resolved, can result in increased tree planting and lower land reclamation cost.

  19. 30 CFR 784.200 - Interpretive rules related to General Performance Standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RECLAMATION AND OPERATION PLAN § 784.200 Interpretive rules related to General Performance Standards. The... ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... Surface Mining Reclamation and Enforcement. (a) Interpretation of § 784.15: Reclamation plan: Postmining...

  20. 31 CFR 235.5 - Reclamation amounts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Reclamation amounts. 235.5 Section 235.5 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE... ON DESIGNATED DEPOSITARIES § 235.5 Reclamation amounts. Amounts received by way of reclamation on...

  1. INFORMATION STORAGE AND RETRIEVAL, REPORTS ON EVALUATION, CLUSTERING, AND FEEDBACK.

    ERIC Educational Resources Information Center

    SALTON, GERALD

    THE TWELFTH IN A SERIES COVERING RESEARCH IN AUTOMATIC STORAGE AND RETRIEVAL, THIS REPORT IS DIVIDED INTO THREE PARTS TITLED EVALUATION, CLUSTER SEARCHING, AND USER FEEDBACK METHODS, RESPECTIVELY. THE FIRST PART, EVALUATION, CONTAINS A COMPLETE SUMMARY OF THE RETRIEVAL RESULTS DERIVED FROM SOME SIXTY DIFFERENT TEXT ANALYSIS EXPERIMENTS. IN EACH…

  2. The Optimization of Automatically Generated Compilers.

    DTIC Science & Technology

    1987-01-01

    than their procedural counterparts, and are also easier to analyze for storage optimizations; (2) AGs can be algorithmically checked to be non-circular...Providing algorithms to move the storage for many attributes from the For structure tree into global stacks and variables. -Dd(2) Creating AEs which build and...54 3.5.2. Partitioning algorithm

  3. 30 CFR 785.11 - Anthracite surface coal mining and reclamation operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Anthracite surface coal mining and reclamation..., DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... Anthracite surface coal mining and reclamation operations. (a) This section applies to any person who...

  4. 30 CFR 785.11 - Anthracite surface coal mining and reclamation operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Anthracite surface coal mining and reclamation..., DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... Anthracite surface coal mining and reclamation operations. (a) This section applies to any person who...

  5. 30 CFR 785.11 - Anthracite surface coal mining and reclamation operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Anthracite surface coal mining and reclamation..., DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... Anthracite surface coal mining and reclamation operations. (a) This section applies to any person who...

  6. 30 CFR 785.11 - Anthracite surface coal mining and reclamation operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Anthracite surface coal mining and reclamation..., DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... Anthracite surface coal mining and reclamation operations. (a) This section applies to any person who...

  7. 30 CFR 785.11 - Anthracite surface coal mining and reclamation operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Anthracite surface coal mining and reclamation..., DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... Anthracite surface coal mining and reclamation operations. (a) This section applies to any person who...

  8. 43 CFR 429.31 - What uses are prohibited on Reclamation land, facilities, and waterbodies?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... land, facilities, and waterbodies? 429.31 Section 429.31 Public Lands: Interior Regulations Relating to..., FACILITIES, AND WATERBODIES Prohibited and Unauthorized Uses of Reclamation Land, Facilities, and Waterbodies § 429.31 What uses are prohibited on Reclamation land, facilities, and waterbodies? (a) Reclamation...

  9. 30 CFR 784.15 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Reclamation plan: Land use information. 784.15... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER... PLAN § 784.15 Reclamation plan: Land use information. (a) The plan shall contain a statement of the...

  10. 30 CFR 780.23 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Reclamation plan: Land use information. 780.23... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER... PLAN § 780.23 Reclamation plan: Land use information. (a) The plan shall contain a statement of the...

  11. 7 CFR 632.21 - Reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Reclamation plan. 632.21 Section 632.21 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL ABANDONED MINE PROGRAM Participation § 632.21 Reclamation plan. (a) Responsibility. Land users are responsible for developing a reclamation plan that will serve as a basis for a...

  12. 43 CFR 422.9 - Reclamation law enforcement contracts and cooperative agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Reclamation law enforcement contracts and... PROJECTS Program Requirements § 422.9 Reclamation law enforcement contracts and cooperative agreements. (a... Federal laws. (b) Each contract and cooperative agreement authorizing the exercise of Reclamation law...

  13. 30 CFR 780.27 - Reclamation plan: Surface mining near underground mining.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Reclamation plan: Surface mining near underground mining. 780.27 Section 780.27 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL...

  14. 31 CFR 240.8 - Reclamation of amounts of paid checks.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .../check_security_new.pdf. Institutions may contact the Fiscal Service Questioned Documents Branch at (202...) Reclamation debts are due to be paid upon receipt of the reclamation by the reclamation debtor. Interest, penalties, and administrative costs associated with unpaid balances will accrue as follows: (1) Interest...

  15. 17 CFR 256.307 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., communications and dispatching, automatic data processing, information storage and retrieval, research and laboratory testing, construction, meter repairing, and printing and stationery. Subaccounts shall be...

  16. Increasing Crop Yields in Water Stressed Countries by Combining Operations of Freshwater Reservoir and Wastewater Reclamation Plant

    NASA Astrophysics Data System (ADS)

    Bhushan, R.; Ng, T. L.

    2015-12-01

    Freshwater resources around the world are increasing in scarcity due to population growth, industrialization and climate change. This is a serious concern for water stressed countries, including those in Asia and North Africa where future food production is expected to be negatively affected by this. To address this problem, we investigate the potential of combining freshwater reservoir and wastewater reclamation operations. Reservoir water is the cheaper source of irrigation, but is often limited and climate sensitive. Treated wastewater is a more reliable alternative for irrigation, but often requires extensive further treatment which can be expensive. We propose combining the operations of a reservoir and a wastewater reclamation plant (WWRP) to augment the supply from the reservoir with reclaimed water for increasing crop yields in water stressed regions. The joint system of reservoir and WWRP is modeled as a multi-objective optimization problem with the double objective of maximizing the crop yield and minimizing total cost, subject to constraints on reservoir storage, spill and release, and capacity of the WWRP. We use the crop growth model Aquacrop, supported by The Food and Agriculture Organization of the United Nations (FAO), to model crop growth in response to water use. Aquacrop considers the effects of water deficit on crop growth stages, and from there estimates crop yield. We generate results comparing total crop yield under irrigation with water from just the reservoir (which is limited and often interrupted), and yield with water from the joint system (which has the potential of higher supply and greater reliability). We will present results for locations in India and Africa to evaluate the potential of the joint operations for improving food security in those areas for different budgets.

  17. 30 CFR 904.20 - Approval of Arkansas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of Arkansas abandoned mine land reclamation plan. 904.20 Section 904.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT.... Box 8913, Little Rock, AR 72219-8913. (b) Office of Surface Mining Reclamation and Enforcement, Tulsa...

  18. 30 CFR 904.20 - Approval of Arkansas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Approval of Arkansas abandoned mine land reclamation plan. 904.20 Section 904.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT.... Box 8913, Little Rock, AR 72219-8913. (b) Office of Surface Mining Reclamation and Enforcement, Tulsa...

  19. 30 CFR 904.20 - Approval of Arkansas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Arkansas abandoned mine land reclamation plan. 904.20 Section 904.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT.... Box 8913, Little Rock, AR 72219-8913. (b) Office of Surface Mining Reclamation and Enforcement, Tulsa...

  20. 30 CFR 904.20 - Approval of Arkansas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of Arkansas abandoned mine land reclamation plan. 904.20 Section 904.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT.... Box 8913, Little Rock, AR 72219-8913. (b) Office of Surface Mining Reclamation and Enforcement, Tulsa...

  1. 30 CFR 904.20 - Approval of Arkansas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of Arkansas abandoned mine land reclamation plan. 904.20 Section 904.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT.... Box 8913, Little Rock, AR 72219-8913. (b) Office of Surface Mining Reclamation and Enforcement, Tulsa...

  2. 30 CFR 947.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 947.784 Section 947.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  3. 30 CFR 922.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 922.784 Section 922.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  4. 30 CFR 905.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 905.780 Section 905.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  5. 30 CFR 933.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 933.784 Section 933.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  6. 30 CFR 939.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 939.784 Section 939.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  7. 30 CFR 910.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 910.780 Section 910.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  8. 30 CFR 941.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 941.784 Section 941.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  9. 30 CFR 947.780 - Surface mining permit application-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 947.780 Section 947.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Application—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  10. 30 CFR 937.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 937.780 Section 937.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  11. 30 CFR 912.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 912.784 Section 912.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  12. 30 CFR 903.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 903.780 Section 903.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application to conduct...

  13. 30 CFR 942.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 942.780 Section 942.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  14. 30 CFR 942.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 942.784 Section 942.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  15. 30 CFR 921.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 921.784 Section 921.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  16. 30 CFR 905.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 905.784 Section 905.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  17. 30 CFR 937.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 937.784 Section 937.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  18. 30 CFR 910.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 910.784 Section 910.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  19. 30 CFR 941.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 941.780 Section 941.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  20. 30 CFR 912.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 912.780 Section 912.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  1. 30 CFR 933.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 933.780 Section 933.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  2. 30 CFR 939.780 - Surface mining permit applications-minimum requirements for reclamation and operations plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operations plan. 939.780 Section 939.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operations plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  3. 30 CFR 921.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 921.780 Section 921.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  4. 30 CFR 903.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 903.784 Section 903.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application...

  5. 30 CFR 922.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 922.780 Section 922.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  6. 30 CFR 938.25 - Approval of Pennsylvania abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Pennsylvania abandoned mine land reclamation plan amendments. 938.25 Section 938.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE PENNSYLVANIA § 938.25 Approval of Pennsylvania abandoned mine land reclamation plan amendments...

  7. 43 CFR 404.45 - What will be included in the appraisal report prepared by Reclamation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What will be included in the appraisal report prepared by Reclamation? 404.45 Section 404.45 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM...

  8. 43 CFR 404.21 - What is Reclamation's role in preparing the full proposal?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What is Reclamation's role in preparing the full proposal? 404.21 Section 404.21 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404...

  9. 43 CFR 404.22 - How will Reclamation evaluate my full proposal?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation evaluate my full proposal? 404.22 Section 404.22 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.22 How will...

  10. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... and identify opportunities to ensure safe and adequate rural water supplies for domestic, municipal... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false What is the Reclamation Rural Water Supply... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the...

  11. 77 FR 11155 - Notice of Intent To Prepare an Environmental Impact Statement on the Pojoaque Basin Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Notice of Intent To Prepare an Environmental... Reclamation, Interior. ACTION: Notice of intent. SUMMARY: The Bureau of Reclamation (Reclamation) intends to... plan, design, and construct the Pojoaque Basin Regional Water System in accordance with the Settlement...

  12. 30 CFR 902.25 - Approval of Alaska abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... reclamation plan amendments. 902.25 Section 902.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE ALASKA § 902.25 Approval of Alaska abandoned mine land reclamation plan amendments. The following... approving all, or portions of these amendments, were published in the Federal Register and the State...

  13. 30 CFR 902.25 - Approval of Alaska abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... reclamation plan amendments. 902.25 Section 902.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE ALASKA § 902.25 Approval of Alaska abandoned mine land reclamation plan amendments. The following... approving all, or portions of these amendments, were published in the Federal Register and the State...

  14. 30 CFR 902.25 - Approval of Alaska abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... reclamation plan amendments. 902.25 Section 902.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE ALASKA § 902.25 Approval of Alaska abandoned mine land reclamation plan amendments. The following... approving all, or portions of these amendments, were published in the Federal Register and the State...

  15. 30 CFR 906.25 - Approval of Colorado abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Colorado abandoned mine land reclamation plan amendments. 906.25 Section 906.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE COLORADO § 906.25 Approval of Colorado abandoned mine land reclamation plan amendments. The...

  16. Succession of Bacterial Community Structure and Diversity in Soil along a Chronosequence of Reclamation and Re-Vegetation on Coal Mine Spoils in China

    PubMed Central

    Li, Yuanyuan; Wen, Hongyu; Chen, Longqian; Yin, Tingting

    2014-01-01

    The growing concern about the effectiveness of reclamation strategies has motivated the evaluation of soil properties following reclamation. Recovery of belowground microbial community is important for reclamation success, however, the response of soil bacterial communities to reclamation has not been well understood. In this study, PCR-based 454 pyrosequencing was applied to compare bacterial communities in undisturbed soils with those in reclaimed soils using chronosequences ranging in time following reclamation from 1 to 20 year. Bacteria from the Proteobacteria, Chloroflexi, Actinobacteria, Acidobacteria, Planctomycetes and Bacteroidetes were abundant in all soils, while the composition of predominant phyla differed greatly across all sites. Long-term reclamation strongly affected microbial community structure and diversity. Initial effects of reclamation resulted in significant declines in bacterial diversity indices in younger reclaimed sites (1, 8-year-old) compared to the undisturbed site. However, bacterial diversity indices tended to be higher in older reclaimed sites (15, 20-year-old) as recovery time increased, and were more similar to predisturbance levels nearly 20 years after reclamation. Bacterial communities are highly responsive to soil physicochemical properties (pH, soil organic matter, Total N and P), in terms of both their diversity and community composition. Our results suggest that the response of soil microorganisms to reclamation is likely governed by soil characteristics and, indirectly, by the effects of vegetation restoration. Mixture sowing of gramineae and leguminosae herbage largely promoted soil geochemical conditions and bacterial diversity that recovered to those of undisturbed soil, representing an adequate solution for soil remediation and sustainable utilization for agriculture. These results confirm the positive impacts of reclamation and vegetation restoration on soil microbial diversity and suggest that the most important phase of microbial community recovery occurs between 15 and 20 years after reclamation. PMID:25502754

  17. Addressing Open Water Data Challenges in the Bureau of Reclamation

    NASA Astrophysics Data System (ADS)

    Brekke, L. D.; Danner, A.; Nagode, J.; Rocha, J.; Poulton, S.; Anderson, A.

    2017-12-01

    The Bureau of Reclamation is largest wholesaler of water in the United States. Located in the 17 western states, Reclamation serves water to 31 million people, provides irrigated water to 20 percent of Western farmers, and is the second largest producer of hydroelectric power in the United States. Through these activities, Reclamation generates large amounts of water and water-related data, describing reservoirs and river system conditions, hydropower, environmental compliance activities, infrastructure assets, and other aspects of Reclamation's mission activities. Reclamation aims to make water and water-related data sets more easily found, accessed, and used in decision-making activities in order to benefit the public, private sector, and research communities. Historically, there has not been an integrated, bureau-wide system to store data in machine-readable formats; nor a system to permit centralized browsing, open access, and web-services. Reclamation began addressing these limitations by developing the Reclamation Water Information System (RWIS), released in Spring 2017 (https://water.usbr.gov/). A bureau-wide team contributed to RWIS development, including water data stewards, database administrators, and information technology (IT) specialists. The first RWIS release publishes reservoir time series data from Reclamation's five regions and includes a map interface for sites identification, a query interface for data discovery and access, and web-services for automated retrieval. As RWIS enhancement continues, the development team is developing a companion system - the Reclamation Information Sharing Environment (RISE) - to provide access to the other data subjects and types (geospatial, documents). While RWIS and RISE are promising starts, Reclamation continues to face challenges in addressing open water data goals: making data consolidation and open publishing a value-added activity for programs that publish data locally, going beyond providing open access to also providing decision-support, and scaling up IT solutions for future success - where Reclamation programs increasingly elect to more and more data through RWIS/RISE, thereby creating a big data challenge. This presentation will highlight activities status, lessons learned, and future directions.

  18. Hydrologic analyses in support of the Navajo Generating Station–Kayenta Mine Complex environmental impact statement

    USGS Publications Warehouse

    Leake, Stanley A.; Macy, Jamie P.; Truini, Margot

    2016-06-01

    IntroductionThe U.S. Department of Interior’s Bureau of Reclamation, Lower Colorado Region (Reclamation) is preparing an environmental impact statement (EIS) for the Navajo Generating Station-Kayenta Mine Complex Project (NGS-KMC Project). The proposed project involves various Federal approvals that would facilitate continued operation of the Navajo Generating Station (NGS) from December 23, 2019 through 2044, and continued operation of the Kayenta Mine and support facilities (collectively called the Kayenta Mine Complex, or KMC) to supply coal to the NGS for this operational period. The EIS will consider several project alternatives that are likely to produce different effects on the Navajo (N) aquifer; the N aquifer is the principal water resource in the Black Mesa area used by the Navajo Nation, Hopi Tribe, and Peabody Western Coal Company (PWCC).The N aquifer is composed of three hydraulically connected formations—the Navajo Sandstone, the Kayenta Formation, and the Lukachukai Member of the Wingate Sandstone—that function as a single aquifer. The N aquifer is confined under most of Black Mesa, and the overlying stratigraphy limits recharge to this part of the aquifer. The N aquifer is unconfined in areas surrounding Black Mesa, and most recharge occurs where the Navajo Sandstone is exposed in the area near Shonto, Arizona. Overlying the N aquifer is the D aquifer, which includes the Dakota Sandstone, Morrison Formation, Entrada Sandstone, and Carmel Formation. The aquifer is named for the Dakota Sandstone, which is the primary water-bearing unit.The NGS is located near Page, Arizona on the Navajo Nation. The KMC, which delivers coal to NGS by way of a dedicated electric railroad, is located approximately 83 miles southeast of NGS (about 125 miles northeast of Flagstaff, Arizona). The Kayenta Mine permit area is located on about 44,073 acres of land leased within the boundaries of the Hopi and Navajo Indian Reservations. KMC has been conducting mining and reclamation operations within the Kayenta Mine permit boundary since 1973.The KMC part of the proposed project requires approval by the Office of Surface Mining (OSM) of a significant revision of the mine’s permit to operate in accordance with the Surface Mine Control and Reclamation Act (Public Law 95-87, 91 Stat. 445 [30 U.S.C. 1201 et seq.]). The revision will identify coal resource areas that may be used to continue extracting coal at the present rate of approximately 8.2 million tons per year. The Kayenta Mine Complex uses water pumped from the D and N aquifers beneath PWCC’s leasehold to support mining and reclamation activities. Prior to 2006, water from the PWCC well field also was used to transport coal by way of a coal-slurry pipeline to the now-closed Mohave Generating Station. Water usage at the leasehold was approximately 4,100 acre-feet per year (acre-ft/yr) during the period the pipeline was in use, and declined to an average 1,255 acre-ft/yr from 2006 to 2011. The Probable Hydrologic Consequences (PHC) section of the mining and reclamation permit must be modified to project the consequences of extended water use by the mine for the duration of the KMC part of the project, including a post-mining reclamation period.Since 1971, the U.S. Geological Survey (USGS) has conducted the Black Mesa Monitoring Program, which consists of monitoring water levels and water quality in the N aquifer, compiling information on water use by PWCC and tribal communities, maintaining several stream-gaging stations, measuring discharge at selected springs, conducting special studies, and reporting findings. These data are useful in evaluating the effects on the N aquifer from PWCC and community pumping, and the effects of variable precipitation.The EIS will assess the impacts of continued pumping on the N aquifer, including changes in storage, water quality, and effects on spring and baseflow discharge, by proposed mining through 2044, and during the reclamation process to 2057.Several groundwater models exist for the area and Reclamation concluded it would conduct a peer review of the groundwater flow model that will be used to assess the direct, reasonably foreseeable indirect, and cumulative effects of future groundwater withdrawals on the D and N aquifers in the Black Mesa area. Reclamation made this determination because of the level of controversy around the effects of continued water use and the comments received from the 2014 draft EIS scoping meetings. Reclamation requested assistance from the USGS in evaluating existing groundwater flow models of the Black Mesa Basin that can be used to predict the effects of different project alternatives on the D and N aquifers.

  19. Large-Scale Wireless Temperature Monitoring System for Liquefied Petroleum Gas Storage Tanks

    PubMed Central

    Fan, Guangwen; Shen, Yu; Hao, Xiaowei; Yuan, Zongming; Zhou, Zhi

    2015-01-01

    Temperature distribution is a critical indicator of the health condition for Liquefied Petroleum Gas (LPG) storage tanks. In this paper, we present a large-scale wireless temperature monitoring system to evaluate the safety of LPG storage tanks. The system includes wireless sensors networks, high temperature fiber-optic sensors, and monitoring software. Finally, a case study on real-world LPG storage tanks proves the feasibility of the system. The unique features of wireless transmission, automatic data acquisition and management, local and remote access make the developed system a good alternative for temperature monitoring of LPG storage tanks in practical applications. PMID:26393596

  20. Information Storage and Retrieval. Reports on Analysis, Search, and Iterative Retrieval.

    ERIC Educational Resources Information Center

    Salton, Gerard

    As the fourteenth report in a series describing research in automatic information storage and retrieval, this document covers work carried out on the SMART project for approximately one year (summer 1967 to summer 1968). The document is divided into four main parts: (1) SMART systems design, (2) analysis and search experiments, (3) user feedback…

  1. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments. The...

  2. 43 CFR 404.49 - What criteria will Reclamation use to determine whether to recommend that a proposed rural water...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.49... project be authorized for construction? In reviewing a feasibility study, Reclamation will assure that the... alternative is clearly supported by the feasibility study, based on application of the following factors...

  3. 43 CFR 404.26 - Must an appraisal investigation be completed before I can request Reclamation to review a...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... completed before I can request Reclamation to review a feasibility study that was not completed under this... appraisal investigation be completed before I can request Reclamation to review a feasibility study that was... prepare an appraisal report recommending that a feasibility study be conducted before Reclamation can...

  4. 43 CFR 404.26 - Must an appraisal investigation be completed before I can request Reclamation to review a...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... completed before I can request Reclamation to review a feasibility study that was not completed under this... appraisal investigation be completed before I can request Reclamation to review a feasibility study that was... prepare an appraisal report recommending that a feasibility study be conducted before Reclamation can...

  5. 43 CFR 404.49 - What criteria will Reclamation use to determine whether to recommend that a proposed rural water...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... determine whether to recommend that a proposed rural water supply project be authorized for construction... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.49 What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply...

  6. 43 CFR 404.14 - How will Reclamation provide notice of opportunities for assistance under the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation provide notice of opportunities for assistance under the program? 404.14 Section 404.14 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY...

  7. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the construction of a rural water supply project under this program? 404.12 Section 404.12 Public... RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.12 Can Reclamation provide assistance with the construction of a rural water supply project under this program? Reclamation may provide assistance with the...

  8. 43 CFR 404.37 - How will Reclamation determine the appropriate non-Federal share of construction costs?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation determine the appropriate non-Federal share of construction costs? 404.37 Section 404.37 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY...

  9. Mine reclamation in Arkansas

    Treesearch

    Floyd Durham; James G. Barnum

    1980-01-01

    Open cut mine land reclamation laws have only been effective since 1971 in Arkansas. Since that time all land affected by mining had to be reclaimed. To guarantee reclamation, the first law required a $500 per acre surety bond be posted with the Arkansas Department of Pollution Control and Ecology. The Arkansas Open Cut Land Reclamation Act of 1977 changed the bonding...

  10. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments. The...

  11. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments. The...

  12. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments. The...

  13. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments. The...

  14. Hydrogeochemical analysis and evaluation of groundwater in the reclaimed small basin of Abu Mina, Egypt

    NASA Astrophysics Data System (ADS)

    Salem, Zenhom E.; Atwia, Mohamed G.; El-Horiny, Mohamed M.

    2015-12-01

    Agricultural reclamation activities during the last few decades in the Western Nile Delta have led to great changes in the groundwater levels and quality. In Egypt, changing the desert land into agricultural land has been done using transferred Nile water (through irrigation canal systems) or/and groundwater. This research investigates the hydrogeochemical changes accompanying the reclamation processes in the small basin of Abu Mina, which is part of the Western Nile Delta region. In summer 2008, 23 groundwater samples were collected and groundwater levels were measured in 40 observation wells. Comparing the groundwater data of the pre-reclamation (1974) and the post-reclamation (2008) periods, groundwater seems to have been subjected to many changes: rise in water level, modification of the flow system, improvement of water quality, and addition of new salts through dissolution processes. Generally, Abu Mina basin is subdivided into two areas, recharge and discharge. The dissolution and mixing were recognized in the recharge areas, while the groundwater of the discharge region carries the signature of the diluted pre-reclamation groundwater. The salts of soil and aquifer deposits play an important role in the salt content of the post and pre-reclamation groundwater. NaCl was the predominant water type in the pre-reclamation groundwater, while CaSO4, NaCl and MgSO4 are the common chemical facies in the post-reclamation groundwater. The post-reclamation groundwater mostly indicates mixing between the pre-reclamation groundwater and the infiltrated freshwater with addition of some ions due to interaction with soil and sediments.

  15. Effect of reclamation on soil organic carbon pools in coastal areas of eastern China

    NASA Astrophysics Data System (ADS)

    Li, Jianguo; Yang, Wenhui; Li, Qiang; Pu, Lijie; Xu, Yan; Zhang, Zhongqi; Liu, Lili

    2018-04-01

    The coastal wetlands of eastern China form one of the most important carbon sinks in the world. However, reclamation can significantly alter the soil carbon pool dynamics in these areas. In this study, a chronosequence was constructed for four reclamation zones in Rudong County, Jiangsu Province, eastern China (reclaimed in 1951, 1974, 1982, and 2007) and a reference salt marsh to identify both the process of soil organic carbon (SOC) evolution, as well as the effect of cropping and soil properties on SOC with time after reclamation. The results show that whereas soil nutrient elements and SOC increased after reclamation, the electrical conductivity of the saturated soil extract (ECe), pH, and bulk density decreased within 62 years following reclamation and agricultural amendment. In general, the soil's chemical properties remarkably improved and SOC increased significantly for approximately 30 years after reclamation. Reclamation for agriculture (rice and cotton) significantly increased the soil organic carbon density (SOCD) in the top 60 cm, especially in the top 0-30 cm. However, whereas the highest concentration of SOCD in rice-growing areas was in the top 0-20 cm of the soil profile, it was greater at a 20-60 cm depth in cottongrowing areas. Reclamation also significantly increased heavy fraction organic carbon (HFOC) levels in the 0-30 cm layer, thereby enhancing the stability of the soil carbon pool. SOC can thus increase significantly over a long time period after coastal reclamation, especially in areas of cultivation, where coastal SOC pools in eastern China tend to be more stable.

  16. Prioritizing abandoned coal mine reclamation projects within the contiguous United States using geographic information system extrapolation.

    PubMed

    Gorokhovich, Yuri; Reid, Matthew; Mignone, Erica; Voros, Andrew

    2003-10-01

    Coal mine reclamation projects are very expensive and require coordination of local and federal agencies to identify resources for the most economic way of reclaiming mined land. Location of resources for mine reclamation is a spatial problem. This article presents a methodology that allows the combination of spatial data on resources for the coal mine reclamation and uses GIS analysis to develop a priority list of potential mine reclamation sites within contiguous United States using the method of extrapolation. The extrapolation method in this study was based on the Bark Camp reclamation project. The mine reclamation project at Bark Camp, Pennsylvania, USA, provided an example of the beneficial use of fly ash and dredged material to reclaim 402,600 sq mi of a mine abandoned in the 1980s. Railroads provided transportation of dredged material and fly ash to the site. Therefore, four spatial elements contributed to the reclamation project at Bark Camp: dredged material, abandoned mines, fly ash sources, and railroads. Using spatial distribution of these data in the contiguous United States, it was possible to utilize GIS analysis to prioritize areas where reclamation projects similar to Bark Camp are feasible. GIS analysis identified unique occurrences of all four spatial elements used in the Bark Camp case for each 1 km of the United States territory within 20, 40, 60, 80, and 100 km radii from abandoned mines. The results showed the number of abandoned mines for each state and identified their locations. The federal or state governments can use these results in mine reclamation planning.

  17. Effect of reclamation on soil organic carbon pools in coastal areas of eastern China

    NASA Astrophysics Data System (ADS)

    Li, Jianguo; Yang, Wenhui; Li, Qiang; Pu, Lijie; Xu, Yan; Zhang, Zhongqi; Liu, Lili

    2018-06-01

    The coastal wetlands of eastern China form one of the most important carbon sinks in the world. However, reclamation can significantly alter the soil carbon pool dynamics in these areas. In this study, a chronosequence was constructed for four reclamation zones in Rudong County, Jiangsu Province, eastern China (reclaimed in 1951, 1974, 1982, and 2007) and a reference salt marsh to identify both the process of soil organic carbon (SOC) evolution, as well as the effect of cropping and soil properties on SOC with time after reclamation. The results show that whereas soil nutrient elements and SOC increased after reclamation, the electrical conductivity of the saturated soil extract (ECe), pH, and bulk density decreased within 62 years following reclamation and agricultural amendment. In general, the soil's chemical properties remarkably improved and SOC increased significantly for approximately 30 years after reclamation. Reclamation for agriculture (rice and cotton) significantly increased the soil organic carbon density (SOCD) in the top 60 cm, especially in the top 0-30 cm. However, whereas the highest concentration of SOCD in rice-growing areas was in the top 0-20 cm of the soil profile, it was greater at a 20-60 cm depth in cottongrowing areas. Reclamation also significantly increased heavy fraction organic carbon (HFOC) levels in the 0-30 cm layer, thereby enhancing the stability of the soil carbon pool. SOC can thus increase significantly over a long time period after coastal reclamation, especially in areas of cultivation, where coastal SOC pools in eastern China tend to be more stable.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Staunton 1 Reclamation Demonstration Project involves an evaluation of the reclamation process for a deep coal mine refuse system. A typical abandoned midwestern deep coal mine refuse site was selected, final land use was determined, baseline data were collected, engineering plans were developed and implemented, and a post-construction evaluation was begun. The project is a cooperative effort by two state agencies--the Abandoned Mined Land Reclamation Council of Illinois the Illinois Institute for Environmental Quality--and the U.S. Department of Energy through the Land Reclamation Program at Argonne National Laboratory. Current investigations are monitoring groundwater, surface water quality, aquatic ecosystems, revegetation,more » soil characteristics, erosion and runoff, soil microbial and soil fauna populations, wildlife, and economic effects of the reclamation effort. The research is a multidisciplinary approach to the concept of ecosystem response to reclamation.« less

  19. Earthworm responses to different reclamation processes in post opencast mining lands during succession.

    PubMed

    Hlava, Jakub; Hlavová, Anna; Hakl, Josef; Fér, Miroslav

    2015-01-01

    This study provides earthworm population data obtained from localities with a substantial anthropogenic impact spoils. The spoil heaps were reclaimed at the end of an opencast brown coal mining period. We studied spoils reclaimed by the two most commonly used reclamation processes: forestry and agricultural. The results show the significance of the locality age and the utilized reclamation process and treatment and their effect on earthworm communities. Our data indicate that apart from soil physical and chemical properties, the reclamation process itself may also induce viability and distribution of earthworm communities. Under standardized soil properties, the changes in earthworm populations during the succession were larger within the agricultural reclamation process as opposed to the forestry reclamation process for earthworm ecological groups and individual species.

  20. Fifth symposium on surface mining and reclamation. NCA/BCR coal conference and Expo IV

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1977-01-01

    The Fifth Symposium on Surface Mining and Reclamation, sponsored by the National Coal Association and Bituminous Coal Research, Inc., was held at the Kentucky Fair and Exposition Center, Louisville, Kentucky, October 18-20, 1977. Twenty-six papers from the proceedings have been entered individually into EDB and ERA. Topics covered include spoil bank revegetation, use of aerial photography, reclamation for row crop production, hydrology, computer programs related to this work, subirrigated alluvial valley floors, reclamation on steep slopes, mountain top removal, surface mine road design, successional processes involved in reclamation, land use planning, etc. (LTN)

  1. 43 CFR 404.49 - What criteria will Reclamation use to determine whether to recommend that a proposed rural water...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply project be authorized for construction? 404.49 Section 404.49 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURA...

  2. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Can Reclamation provide assistance with the construction of a rural water supply project under this program? 404.12 Section 404.12 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview §...

  3. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Can Reclamation provide assistance with the construction of a rural water supply project under this program? 404.12 Section 404.12 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview §...

  4. Information Storage and Retrieval...Reports on Text Analysis, Dynamic Indexing, Feedback Searches, Dictionary Construction and File Organization.

    ERIC Educational Resources Information Center

    Salton, Gerald; And Others

    The present report is the twenty-first in a series describing research in information storage and retrieval conducted by the Department of Computer Science at Cornell University. The report covering work carried out by the SMART project for approximately two years (summer 1970 to summer 1972) is separated into five parts: automatic content…

  5. Litter-Spinning Retarders

    NASA Technical Reports Server (NTRS)

    Wilson, John C.

    1995-01-01

    Aerodynamic plates stop litter from spinning during hoisting by helicopter. Features of proposed litter-spinning retarders include convenience of deployment and independence from ground restraint. Retarder plate(s) folded flat against bottom of litter during storage or while litter is loaded. Plate(s) held in storage position by latch that releases manually or automatically as litter is hoisted. Upon release, springs move plates into deployed position.

  6. Drivers, trends, and potential impacts of long-term coastal reclamation in China from 1985 to 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tian, Bo; Wu, Wenting; Yang, Zhaoqing

    Driven by rapid economic development, population growth, and urbanization, China has experienced severe coastal land reclamation over the last decades, which resulted in significant loss of coastal wetland and wildlife habitat, and degradation of marine ecosystems. This study used advanced remote-sensing techniques to analyze the spatial and temporal distributions of coastal reclamation in China and investigated the relationships between coastal land reclamation and coastal economy, population growth, and urbanization. Analysis of long-term Landsat images time series from 1985 to 2010 in 5-year intervals, in combination with remotely sensed image techniques, indicated a sharp increasing trend of land reclamation after 2005,more » which accounted for over 35% of China’s total reclamation during the 25-year period since 1985. High-intensity coastal reclamation in China was mainly driven by the booming economy associated with urbanization and industrial development in the coastal region. Analysis indicated that coastal land reclamation is closely correlated with the GDP per capita in China. Study results of Landsat images showed that 754,697 ha of coastal wetlands have been reclaimed across all coastal provinces and metropolises from 1985 to 2010, at an annual rate of 5.9%. Coastal areas within the three major economic zones (Bohai Bay, Yangtze River Delta, and Pearl River Delta) were found to generally have higher reclamation rates. For example, the built-up area in Shanghai, which is located in the Yangtze River Delta, increased more than five times from 1985 to 2010. Approximately 35% of the reclamation occurred in Bohai Bay, in which the CRI between 2005 and 2010 was three times higher than the average CRI over the 25-year period.« less

  7. 43 CFR 429.12 - Where do I file my application?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Reclamation office having jurisdiction over the land, facility, or waterbody associated with your request. Reclamation office locations may be found on http://www.usbr.gov, the official Reclamation Internet Web site. ...

  8. 43 CFR 429.12 - Where do I file my application?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Reclamation office having jurisdiction over the land, facility, or waterbody associated with your request. Reclamation office locations may be found on http://www.usbr.gov, the official Reclamation Internet Web site. ...

  9. 30 CFR 884.13 - Content of proposed State reclamation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... reclamation program, the Rural Abandoned Mine Program administered by the Soil Conservation Service, the... within the State which require reclamation, including— (1) A map showing the general location or known or...

  10. 30 CFR 884.13 - Content of proposed State reclamation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... reclamation program, the Rural Abandoned Mine Program administered by the Soil Conservation Service, the... within the State which require reclamation, including— (1) A map showing the general location or known or...

  11. 30 CFR 884.13 - Content of proposed State reclamation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... reclamation program, the Rural Abandoned Mine Program administered by the Soil Conservation Service, the... within the State which require reclamation, including— (1) A map showing the general location or known or...

  12. Mine Land Reclamation and Eco-Reconstruction in Shanxi Province I: Mine Land Reclamation Model

    PubMed Central

    Bing-yuan, Hao; Li-xun, Kang

    2014-01-01

    Coal resource is the main primary energy in our country, while Shanxi Province is the most important province in resource. Therefore Shanxi is an energy base for our country and has a great significance in energy strategy. However because of the heavy development of the coal resource, the ecological environment is worsening and the farmland is reducing continuously in Shanxi Province. How to resolve the contradiction between coal resource exploitation and environmental protection has become the imperative. Thus the concept of “green mining industry” is arousing more and more attention. In this assay, we will talk about the basic mode of land reclamation in mine area, the engineering study of mine land reclamation, the comprehensive model study of mine land reclamation, and the design and model of ecological agricultural reclamation in mining subsidence. PMID:25050398

  13. 43 CFR 404.25 - How can I request Reclamation to review an appraisal investigation or feasibility study that was...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.25 How can I request Reclamation to... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false How can I request Reclamation to review an... prioritization criteria in § 404.13. (c) You may make your submittal at any time and are not required to submit a...

  14. 43 CFR 404.25 - How can I request Reclamation to review an appraisal investigation or feasibility study that was...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.25 How can I request Reclamation to... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How can I request Reclamation to review an... prioritization criteria in § 404.13. (c) You may make your submittal at any time and are not required to submit a...

  15. Ground water in the vicinity of Capulin, New Mexico

    USGS Publications Warehouse

    Hart, D.L.; Smith, Christian

    1979-01-01

    The alluvial deposits within a closed basin near Capulin, New Mexico, are estimated to have 189,000 acre-feet of water in storage. These deposits have an estimated average transmissivity of 400 feet squared per day and represent the major source of ground water. Well yields range from a few gallons per minute to as much as 900 gallons per minute, with average potential yields ranging from about 100 to 200 gallons per minute in areas of greatest saturated thickness. Additional large quantities of water are available for short-term supplies from the saturated basaltic cinders west and northwest of the town of Capulin. Wells completed in the cinders reportedly have produced as much as 2,000 gallons per minute. The chemical quality of water in the alluvium and cinder aquifers appears to be chemically satisfactory for municipal use. The ground water in storage is sufficient to supplement Raton, New Mexico 's water needs to the year 2030 at the water demand rate projected by the Bureau of Reclamation. (Woodard-USGS)

  16. Oil sands mining and reclamation cause massive loss of peatland and stored carbon

    PubMed Central

    Rooney, Rebecca C.; Bayley, Suzanne E.; Schindler, David W.

    2012-01-01

    We quantified the wholesale transformation of the boreal landscape by open-pit oil sands mining in Alberta, Canada to evaluate its effect on carbon storage and sequestration. Contrary to claims made in the media, peatland destroyed by open-pit mining will not be restored. Current plans dictate its replacement with upland forest and tailings storage lakes, amounting to the destruction of over 29,500 ha of peatland habitat. Landscape changes caused by currently approved mines will release between 11.4 and 47.3 million metric tons of stored carbon and will reduce carbon sequestration potential by 5,734–7,241 metric tons C/y. These losses have not previously been quantified, and should be included with the already high estimates of carbon emissions from oil sands mining and bitumen upgrading. A fair evaluation of the costs and benefits of oil sands mining requires a rigorous assessment of impacts on natural capital and ecosystem services. PMID:22411786

  17. Integrated water and waste management system for future spacecraft

    NASA Technical Reports Server (NTRS)

    Ingelfinger, A. L.; Murray, R. W.

    1974-01-01

    Over 200 days of continuous testing have been completed on an integrated waste management-water recovery system developed by General Electric under a jointly funded AEC/NASA/AF Contract. The 4 man system provides urine, feces, and trash collection; water reclamation; storage, heating and dispensing of the water; storage and disposal of the feces and urine residue and all of other nonmetallic waste material by incineration. The heat required for the 1200 deg F purification processes is provided by a single 420-w radioisotope heater. A second 836-w radioisotope heater supplemented by 720 w of electrical heat provides for distillation and water heating. Significant test results are no pre-or-post treatment, greater than 98 per cent potable water recovery, approximately 95 per cent reduction in solids weight and volume, all outflows are sterile with the water having no bacteria or virus, and the radioisotope capsule radiation level is only 7.9 mrem/hr unshielded at 1 m (neutrons and gamma).

  18. 43 CFR 404.17 - How will Reclamation evaluate my statement of interest?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.17... proposed rural water supply project is eligible for further consideration through a full proposal; (b) If...

  19. Landscape ecological security response to land use change in the tidal flat reclamation zone, China.

    PubMed

    Zhang, Runsen; Pu, Lijie; Li, Jianguo; Zhang, Jing; Xu, Yan

    2016-01-01

    As coastal development becomes a national strategy in Eastern China, land use and landscape patterns have been affected by reclamation projects. In this study, taking Rudong County, China as a typical area, we analyzed land use change and its landscape ecological security responses in the tidal flat reclamation zone. The results show that land use change in the tidal flat reclamation zone is characterized by the replacement of natural tidal flat with agricultural and construction land, which has also led to a big change in landscape patterns. We built a landscape ecological security evaluation system, which consists of landscape interference degree and landscape fragile degree, and then calculated the landscape ecological security change in the tidal flat reclamation zone from 1990 to 2008 to depict the life cycle in tidal flat reclamation. Landscape ecological security exhibited a W-shaped periodicity, including the juvenile stage, growth stage, and maturation stage. Life-cycle analysis demonstrates that 37 years is required for the land use system to transform from a natural ecosystem to an artificial ecosystem in the tidal flat reclamation zone.

  20. 30 CFR 784.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.1 Scope. This part... mining operations and reclamation plans portions of applications for permits for underground mining...

  1. Developing standards and specifications for full depth pavement reclamation.

    DOT National Transportation Integrated Search

    2012-05-25

    The report summarizes the work conducted during the development of procedures for conducting full depth reclamation of existing asphalt surfaced and unsurfaced roads. The report describes full depth reclamation, and includes a summary of available li...

  2. Synthesis of natural flows at selected sites in the upper Missouri River basin, Montana, 1928-89

    USGS Publications Warehouse

    Cary, L.E.; Parrett, Charles

    1996-01-01

    Natural monthly streamflows were synthesized for the years 1928-89 for 43 sites in the upper Missouri River Basin upstream from Fort Peck Lake in Montana. The sites are represented as nodes in a streamflow accounting model being developed by the Bureau of Reclamation. Recorded and historical flows at most sites have been affected by human activities including reservoir storage, diversions for irrigation, and municipal use. Natural flows at the sites were synthesized by eliminating the effects of these activities. Recorded data at some sites do not include the entire study period. The missing flows at these sites were estimated using a statistical procedure. The methods of synthesis varied, depending on upstream activities and information available. Recorded flows were transferred to nodes that did not have streamflow-gaging stations from the nearest station with a sufficient length of record. The flows at one node were computed as the sum of flows from three upstream tributaries. Monthly changes in reservoir storage were computed from monthend contents. The changes in storage were corrected for the effects of evaporation and precipitation using pan-evaporation and precipitation data from climate stations. Irrigation depletions and consumptive use by the three largest municipalities were computed. Synthesized natural flow at most nodes was computed by adding algebraically the upstream depletions and changes in reservoir storage to recorded or historical flow at the nodes.

  3. 30 CFR 701.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL PERMANENT... program implementation; (2) Subchapter D on surface coal mining and reclamation operations on Federal lands; (3) Subchapter E on surface coal mining and reclamation operations on Indian lands. (4...

  4. 30 CFR 780.10 - Information collection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.10... activities, including a requirement that the application include an operation and reclamation plan. The...

  5. 30 CFR 701.4 - Responsibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL PERMANENT... responsibility for regulation of coal exploration and surface coal mining and reclamation operations during the... mining and reclamation operations, approval of coal exploration which substantially disturbs the natural...

  6. Storage resource manager

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Perelmutov, T.; Bakken, J.; Petravick, D.

    Storage Resource Managers (SRMs) are middleware components whose function is to provide dynamic space allocation and file management on shared storage components on the Grid[1,2]. SRMs support protocol negotiation and reliable replication mechanism. The SRM standard supports independent SRM implementations, allowing for a uniform access to heterogeneous storage elements. SRMs allow site-specific policies at each location. Resource Reservations made through SRMs have limited lifetimes and allow for automatic collection of unused resources thus preventing clogging of storage systems with ''orphan'' files. At Fermilab, data handling systems use the SRM management interface to the dCache Distributed Disk Cache [5,6] and themore » Enstore Tape Storage System [15] as key components to satisfy current and future user requests [4]. The SAM project offers the SRM interface for its internal caches as well.« less

  7. Recent developments in the reclamation of surface mined lands

    USGS Publications Warehouse

    Sharma, K.D.; Gough, L.P.; Kumar, S.; Sharma, B.K.; Saxena, S.K.

    1997-01-01

    A broad review of mine land reclamation problems and challenges in arid lands is presented with special emphasis on work recently completed in India. The economics of mining in the Indian Desert is second only to agriculture in importance. Lands disturbed by mining, however, have only recently been the focus of reclamation attempts. Studies were made and results compiled of problems associated with germplasm selection, soil, plant and overburden characterization and manipulation, plant establishment methods utilized, soil amendment needs, use and conservation of available water and the evaluation of ecosystem sustainability. Emphasis is made of the need for multi-disciplinary approaches to mine land reclamation research and for the long-term monitoring of reclamation success.

  8. Achievements in optical data storage and retrieval

    NASA Technical Reports Server (NTRS)

    Nelson, R. H.; Shuman, C. A.

    1977-01-01

    The present paper deals with the current achievements in two technology efforts, one of which is a wideband holographic recorder which uses multichannel recording of data in the form of holograms on roll film for storage and retrieval of large unit records at hundreds of megabit per second. The second effort involves a system (termed DIGIMEN) which uses binary spot recording on photographic film in the form of microfiche to provide a mass storage capability with automatic computer-controlled random access to stored records. Some potential design improvements are noted.

  9. Use of morphometric soil aggregates parameters to evaluate the reclamation process in mined areas located at amazon forest - Brazil

    NASA Astrophysics Data System (ADS)

    Ribeiro, A. I.; Fengler, F. H.; Longo, R. M.; Mello, G. F.; Damame, D. B.; Crowley, D. E.

    2015-12-01

    Brazil has a high mineral potential that have been explored over the years. A large fraction of these mineral resources are located in Amazon region, which is known for its large biodiversity and world climate importance. As the policies that control the Amazon preservation are relatively new, several mining activities have been exploring the Amazon territory, promoting a large process of degradation. Once the mining activities have a high potential of environmental changes the government created polices to restrain the mining in Amazon forests and obligate mining companies to reclaim theirs minded areas. However, the measurement of reclamation development still is a challenging task for the Professionals involved. The volume and complexity of the variables, allied to the difficulty in identifying the reclamation of ecosystem functionalities are still lack to ensure the reclamation success. In this sense this work aims to investigate the representativeness of morphometric soil aggregates parameters in the understanding of reclamation development. The study area is located in the National Forest of Jamari, State of Rondônia. In the past mining companies explored the region producing eight closed mines that are now in reclamation process. The soil aggregates morphometric measurements: geometric mean diameter (GMD), aggregate circularity index, and aggregate roundness, were choose based in its obtaining facility, and their association to biological activity. To achieve the proposed objective the aggregates of eight sites in reclamation, from different closed mines, where chosen and compared to Amazon forest and open mine soil aggregates. The results were analyzed to one way ANOVA to identifying differences between areas in reclamation, natural ecosystem, and open mine. It was obtained differences for GMD and circularity index. However, only the circularity index allowed to identifying differences between the reclamation sites. The results allowed concluding: (1) Morphometric aggregates measurements can represent the reclamation process in Amazon territory; (2) To validate the results more areas in reclamation process in different ecosystems must be investigated; (3) Roundness didn't represented any differences.Key words: circularity index, ecosystem, geometric mean diameter.

  10. 30 CFR 735.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PERMANENT REGULATORY... State programs for the regulation and control of surface coal mining and reclamation operations; (b) Administer and enforce State programs for the regulation and control of surface coal mining and reclamation...

  11. 30 CFR 780.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.1 Scope. This part provides the... operations and reclamation plan portions of applications for permits for surface mining activities, except to...

  12. 77 FR 67024 - Notice of Proposed Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... procedures and requirements for terminating jurisdiction of surface coal mining and reclamation operations... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Notice...

  13. 77 FR 58056 - Mississippi Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 924... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM...

  14. 76 FR 36039 - Colorado Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-21

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 906... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and... Mining Control and Reclamation Act of 1977 (``SMCRA'' or ``the Act''). Colorado proposes both additions...

  15. 77 FR 34890 - Oklahoma Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 936... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation...

  16. 76 FR 50708 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing. SUMMARY: We, the Office of Surface Mining Reclamation...

  17. 75 FR 60371 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 901... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation...

  18. 77 FR 41680 - Indiana Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-16

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 914... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving amendments to the Indiana...

  19. 77 FR 25949 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation...

  20. 76 FR 76109 - Colorado Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 906... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; reopening and extension of public...'') under the Surface Mining Control and Reclamation Act of 1977 (``SMCRA'' or ``the Act''). Colorado...

  1. 77 FR 66574 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation...

  2. 77 FR 18149 - Montana Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-27

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 926... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; reopening and extension of public... receipt of Montana's response to the Office of Surface Mining Reclamation and Enforcement's (OSM) November...

  3. 77 FR 24661 - North Dakota Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-25

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 934... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and... Surface Mining Control and Reclamation Act of 1977 (``SMCRA'' or ``the Act''). North Dakota proposes...

  4. 76 FR 23522 - Oklahoma Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-27

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 936... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM...

  5. 75 FR 21534 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation...

  6. 77 FR 34892 - Utah Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 944... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation...

  7. 77 FR 18738 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation...

  8. 76 FR 9700 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 901... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation...

  9. 43 CFR 404.23 - How will Reclamation determine whether you or your contractor is qualified to conduct an...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.23 How will Reclamation... expertise needed may include, but are not limited to, water management planning, engineering, hydrology...

  10. 77 FR 31038 - Notice of Proposed Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection AGENCY: Office of Surface Mining Reclamation and Enforcement. ACTION: Notice and... Surface Mining Reclamation and Enforcement (OSM) is announcing that the information collection request for...

  11. 77 FR 21807 - Notice of Proposed Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Notice... of Surface Mining Reclamation and Enforcement (OSM) is announcing its intention to request approval...

  12. 77 FR 40796 - Wyoming Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 950... Mining Reclamation and Enforcement, Interior. ACTION: Final rule. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are removing a disapproval codified in OSM regulations...

  13. 77 FR 34894 - Wyoming Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 950... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; withdrawal. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are announcing the withdrawal of a proposed rule...

  14. 76 FR 12857 - Montana Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 926... of Surface Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment... the Surface Mining Control and Reclamation Act of 1977 (``SMCRA'' or ``the Act''). Montana proposed...

  15. 77 FR 6141 - Notice of Proposed Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-07

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection AGENCY: Office of Surface Mining Reclamation and Enforcement. ACTION: Notice and... Surface Mining Reclamation and Enforcement (OSM) is announcing its intention to request approval to...

  16. 78 FR 11617 - Pennsylvania Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 938... Surface Mining Reclamation and Enforcement (OSM), Interior. ACTION: Proposed rule; reopening of comment... regulatory program (the ``Pennsylvania program'') under the Surface Mining Control and Reclamation Act of...

  17. Modeling the temporal dynamics of intertidal benthic infauna biomass with environmental factors: Impact assessment of land reclamation.

    PubMed

    Yang, Ye; Chui, Ting Fong May; Shen, Ping Ping; Yang, Yang; Gu, Ji Dong

    2018-03-15

    Anthropogenic activities such as land reclamation are threatening tidal marshes worldwide. This study's hypothesis is that land reclamation in a semi-enclosed bay alters the seasonal dynamics of intertidal benthic infauna, which is a key component in the tidal marsh ecosystem. Mai Po Tidal Marsh, Deep Bay, Pearl River Estuary, China was used as a case study to evaluate the hypothesis. Ecological models that simulate benthic biomass dynamics with governing environmental factors were developed, and various scenario experiments were conducted to evaluate the impact of reclamations. Environmental variables, selected from the areas of hydrodynamics, meteorology, and water quality based on correlation analysis, were used to generate Bayesian regression models for biomass prediction. The best-performing model, which considered average water age (i.e., a hydrodynamic indicator of estuarine circulation) in the previous month, salinity variation (i.e., standard deviation of salinity), and the total sunny period in the current month, captured well both seasonal and yearly trends in the benthic infauna observations from 2002 to 2008. This model was then used to simulate biomass dynamics with varying inputs of water age and salinity variation from coastal numerical models of different reclamation scenarios. The simulation results suggest that the reclamation in 2007 decreased the spatial and annual average benthic infauna biomass in the tidal marsh by 20%, which agreed with the 28% biomass decrease recorded by field survey. The range of biomass seasonal variation also decreased significantly from 2.1 to 230.5g/m 2 (without any reclamation) to 1.2 to 131.1g/m 2 (after the 2007 reclamation), which further demonstrates the substantial ecological impact of reclamation. The ecological model developed in this study could simulate seasonal biomass dynamics and evaluate the ecological impact of reclamation projects. It can therefore be applied to evaluate the ecological impact of coastal engineering projects for tidal marsh management, conservation, and restoration. Copyright © 2017 Elsevier B.V. All rights reserved.

  18. 30 CFR 740.11 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... jurisdiction. (e) This subchapter shall not apply to surface coal mining and reclamation operations within a... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.11...

  19. 78 FR 6062 - North Dakota Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-29

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 934... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and... Surface Mining Control and Reclamation Act of 1977 (``SMCRA'' or ``the Act''). North Dakota intends to...

  20. 77 FR 34888 - Kentucky Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 917 [KY-255-FOR; OSM-2012-0004] Kentucky Regulatory Program AGENCY: Office of Surface Mining Reclamation... Program (hereinafter, the ``Kentucky program'') under the Surface Mining Control and Reclamation Act of...

  1. 77 FR 31486 - Virginia Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-29

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 946 [VA-126-FOR; OSM-2008-0012] Virginia Regulatory Program AGENCY: Office of Surface Mining Reclamation... an amendment to the Virginia regulatory program under the Surface Mining Control and Reclamation Act...

  2. 76 FR 4266 - New Mexico Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 931... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and... Mining Control and Reclamation Act of 1977 (``SMCRA'' or ``the Act''). New Mexico proposes revisions to...

  3. 76 FR 9642 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 901... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving an amendment to the Alabama...

  4. 78 FR 13002 - Pennsylvania Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-26

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 938... Mining Reclamation and Enforcement (``OSM''), Interior. ACTION: Proposed rule; public comment period and... regulatory program under the Surface Mining Control and Reclamation Act of 1977 (``SMCRA'' or the ``Act...

  5. 78 FR 11579 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving an amendment to the Texas...

  6. 78 FR 10512 - Wyoming Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 950... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment with certain... ``Wyoming program'') under the Surface Mining Control and Reclamation Act of 1977 (``SMCRA'' or ``the Act...

  7. 76 FR 50436 - Kentucky Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 917 [KY-254-FOR; OSM-2011-0005] Kentucky Regulatory Program AGENCY: Office of Surface Mining Reclamation... Program (hereinafter, the ``Kentucky program'') under the Surface Mining Control and Reclamation Act of...

  8. 77 FR 8144 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving three...

  9. 76 FR 30008 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 901... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving an amendment to the Alabama...

  10. 75 FR 43476 - Montana Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 926... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; reopening and extension of public...'') under the Surface Mining Control and Reclamation Act of 1977 (``SMCRA'' or ``the Act''). Montana revised...

  11. 30 CFR 800.14 - Determination of bond amount.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 800.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR BONDING AND INSURANCE REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS BOND AND INSURANCE REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS UNDER REGULATORY PROGRAMS § 800.14...

  12. 75 FR 81122 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving an amendment to the Texas...

  13. 77 FR 58025 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving an amendment to the Texas...

  14. 76 FR 44357 - Notice of Proposed Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-25

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior Department... Reduction Act of 1995, the Office of Surface Mining Reclamation and Enforcement (OSM) is announcing its...

  15. 76 FR 79213 - Notice of Proposed Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-21

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Notice... 1995, the Office of Surface Mining Reclamation and Enforcement (OSM) is announcing that the information...

  16. 30 CFR 874.16 - Contractor eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 874.16 Section 874.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.16 Contractor eligibility. To receive...

  17. 30 CFR 875.20 - Contractor eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 875.20 Section 875.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION CERTIFICATION AND NONCOAL RECLAMATION § 875.20 Contractor eligibility. Every...

  18. 77 FR 58147 - Action Subject to Intergovernmental Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Action Subject to Intergovernmental Review AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Notice. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement, are notifying the public that we...

  19. 76 FR 78312 - Action Subject to Intergovernmental Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Action Subject to Intergovernmental Review AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Notice. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement, are notifying the public that we...

  20. Reclamation after oil and gas development does not speed up succession or plant community recovery in big sagebrush ecosystems in Wyoming

    USGS Publications Warehouse

    Rottler, Caitlin M.; Burke, Ingrid C.; Palmquist, Kyle A.; Bradford, John B.; Lauenroth, William K.

    2018-01-01

    Article for intended outlet: Restoration Ecology. Abstract: Reclamation is an application of treatment(s) following a disturbance to promote succession and accelerate the return of target conditions. Previous studies have framed reclamation in the context of succession by studying its effectiveness in re-establishing late-successional plant communities. Re-establishment of these plant communities is especially important and potentially challenging in regions such as drylands and shrub steppe ecosystems where succession proceeds slowly. Dryland shrub steppe ecosystems are frequently associated with areas rich in fossil-fuel energy sources, and as such the need for effective reclamation after disturbance from fossil-fuel-related energy development is great. Past research in this field has focused primarily on coal mines; few researchers have studied reclamation after oil and gas development. To address this research gap and to better understand the effect of reclamation on rates of succession in dryland shrub steppe ecosystems, we sampled oil and gas wellpads and adjacent undisturbed big sagebrush plant communities in Wyoming, USA and quantified the extent of recovery for major functional groups on reclaimed and unreclaimed (recovered via natural succession) wellpads relative to the undisturbed plant community. Reclamation increased the rate of recovery for all forb and grass species as a group and for perennial grasses, but did not affect other functional groups. Rather, analyses comparing recovery to environmental variables and time since wellpad abandonment showed that recovery of other groups were affected primarily by soil texture and time since wellpad abandonment. This is consistent with studies in other ecosystems where reclamation has been implemented, suggesting that reclamation may not help re-establish late-successional plant communities more quickly than they would re-establish naturally.

  1. 76 FR 64048 - Pennsylvania Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 938... Surface Mining Reclamation and Enforcement (OSM), Interior. ACTION: Proposed rule; reopening and extension... Mining Control and Reclamation Act of 1977 (SMCRA or the Act) published on February 7, 2011. In response...

  2. 75 FR 60271 - Technical Amendments 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... Part VI Department of the Interior Office of Surface Mining Reclamation and Enforcement 30 CFR... INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Parts 740, 761, 773, 795, 816, 817...: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Final rule. SUMMARY: We, the...

  3. 77 FR 5740 - Tennessee Abandoned Mine Land Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-06

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 942... Mining Reclamation and Enforcement (OSM), Interior. ACTION: Proposed rule; public comment period and... amendment to the Tennessee Abandoned Mine Land (AML) Reclamation Plan under the Surface Mining Control and...

  4. 77 FR 58053 - Kentucky Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 917... Mining Reclamation and Enforcement (OSM), Interior. ACTION: Proposed rule; Removal of Required Amendments... program'') under the Surface Mining Control and Reclamation Act of 1977 (SMCRA or the Act). As a result of...

  5. 75 FR 49518 - Northwest Area Water Supply Project, North Dakota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  6. 75 FR 48986 - Northwest Area Water Supply Project, North Dakota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  7. Oilfield reclamation in mixed grass prairie restores nematode but not plant communities

    USDA-ARS?s Scientific Manuscript database

    Background/Questions/Methods: Energy development in North American grasslands involves developing oil well pads and access roads. Reclamation/revegetation is constant: interim reclaims are conducted when drilling is complete and pumping commences, and final reclamation occurs upon cessation of well ...

  8. 30 CFR 740.1 - Scope and purpose.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.1 Scope and purpose. This part provides for the regulation of surface coal mining and reclamation...

  9. 30 CFR 740.1 - Scope and purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.1 Scope and purpose. This part provides for the regulation of surface coal mining and reclamation...

  10. 30 CFR 740.1 - Scope and purpose.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.1 Scope and purpose. This part provides for the regulation of surface coal mining and reclamation...

  11. 30 CFR 740.1 - Scope and purpose.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.1 Scope and purpose. This part provides for the regulation of surface coal mining and reclamation...

  12. 30 CFR 740.1 - Scope and purpose.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.1 Scope and purpose. This part provides for the regulation of surface coal mining and reclamation...

  13. 43 CFR 420.25 - Reclamation lands administered by other agencies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... for management of Reclamation lands for recreation purposes. Specifically: (1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance with...

  14. 43 CFR 420.25 - Reclamation lands administered by other agencies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... for management of Reclamation lands for recreation purposes. Specifically: (1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance with...

  15. 43 CFR 420.25 - Reclamation lands administered by other agencies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for management of Reclamation lands for recreation purposes. Specifically: (1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance with...

  16. 43 CFR 420.25 - Reclamation lands administered by other agencies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... for management of Reclamation lands for recreation purposes. Specifically: (1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance with...

  17. 43 CFR 420.25 - Reclamation lands administered by other agencies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... for management of Reclamation lands for recreation purposes. Specifically: (1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance with...

  18. 77 FR 16260 - Notice of Proposed Information Collection for 1029-0035

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection for 1029-0035 AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior..., the Office of Surface Mining Reclamation and Enforcement (OSM) is announcing that the information...

  19. 75 FR 22723 - Stream Protection Rule; Environmental Impact Statement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Parts 780... of Surface Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; notice of intent to prepare an environmental impact statement. SUMMARY: We, the Office of Surface Mining Reclamation and...

  20. 31 CFR 240.8 - Reclamation of amounts of paid checks.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....pdf. Institutions may contact the FMS Questioned Documents Branch at (202) 874-7640 for additional... upon receipt of the reclamation by the reclamation debtor. Interest, penalties, and administrative costs associated with unpaid balances will accrue as follows: (1) Interest. Treasury will assess...

  1. 31 CFR 240.8 - Reclamation of amounts of paid checks.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....pdf. Institutions may contact the FMS Questioned Documents Branch at (202) 874-7640 for additional... upon receipt of the reclamation by the reclamation debtor. Interest, penalties, and administrative costs associated with unpaid balances will accrue as follows: (1) Interest. Treasury will assess...

  2. 31 CFR 240.8 - Reclamation of amounts of paid checks.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....pdf. Institutions may contact the FMS Questioned Documents Branch at (202) 874-7640 for additional... upon receipt of the reclamation by the reclamation debtor. Interest, penalties, and administrative costs associated with unpaid balances will accrue as follows: (1) Interest. Treasury will assess...

  3. 31 CFR 240.8 - Reclamation of amounts of paid checks.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....pdf. Institutions may contact the FMS Questioned Documents Branch at (202) 874-7640 for additional... upon receipt of the reclamation by the reclamation debtor. Interest, penalties, and administrative costs associated with unpaid balances will accrue as follows: (1) Interest. Treasury will assess...

  4. Power Management for Space Advanced Life Support

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2001-01-01

    Space power systems include the power source, storage, and management subsystems. In current crewed spacecraft, solar cells are the power source, batteries provide storage, and the crew performs any required load scheduling. For future crewed planetary surface systems using Advanced Life Support, we assume that plants will be grown to produce much of the crew's food and that nuclear power will be employed. Battery storage is much more costly than nuclear power capacity and so is not likely to be used. We investigate the scheduling of power demands by the crew or automatic control, to reduce the peak power load and the required generating capacity. The peak to average power ratio is a good measure of power use efficiency. We can easily schedule power demands to reduce the peak power from its maximum, but simple scheduling approaches may not find the lowest possible peak to average power ratio. An initial power scheduling example was simple enough for a human to solve, but a more complex example with many intermittent load demands required automatic scheduling. Excess power is a free resource and can be used even for minor benefits.

  5. BreathBased Monitoring of Pilot Hypoxia - Proof of Concept

    DTIC Science & Technology

    2016-04-21

    vest, and there are no aircraft connections required. Operation is entirely automatic and data visualization is available via a Bluetooth connected...to USB-connected Flash-RAM (storage depends on module size, 32Gb supported). • Bluetooth transmission of data in real time • Automated storage...via an Android tablet (Figure 4). The tablet acquires the data transmitted using Bluetooth by the pilot worn system module and provides a real-time

  6. GET REAL!

    EPA Science Inventory

    Combined sewer overflow (CSO) is a significant source of pollution in receiving waters. However, implementing a real-time control scheme operates automatic regulators more efficiently to maximize a collection system's storage, treatment, and transport capacities, reducing the vol...

  7. A case of perioperative glucose control by using an artificial pancreas in a patient with glycogen storage disease.

    PubMed

    Yatabe, Tomoaki; Nakamura, Ryu; Kitagawa, Hiroyuki; Munekage, Masaya; Hanazaki, Kazuhiro

    2016-03-01

    A 57-year-old woman was diagnosed with type I glycogen storage disease in her twenties. She had undergone hepatectomy under general anesthesia with epidural anesthesia. Fifty minutes after the induction of anesthesia, a 20-gauge venous catheter was inserted in the patient's right hand, and an artificial pancreas (STG-55, Nikkiso Co., Tokyo, Japan) was connected for continuous glucose monitoring and automatic glucose control. Insulin was infused when the blood glucose level reached 120 mg/dL or higher, and glucose was infused when the level fell to 100 mg/dL or lower. After the Pringle maneuver, the blood glucose level increased, and insulin was administered automatically via an artificial pancreas. Hypoglycemia did not occur during the operation. After total parenteral nutrition was started in the intensive care unit (ICU), the blood glucose level increased, and the artificial pancreas controlled the blood glucose level through automatic insulin administration. Thirty-four hours after admission to the ICU, the artificial pancreas was removed because the blood sampling failed. After the removal of the artificial pancreas, blood glucose level was measured every 2 h until extubation. During the ICU stay, hypoglycemia never occurred, with the average blood glucose level being 144 mg/dL. In conclusion, the use of an artificial pancreas for perioperative blood glucose management in a patient with glycogen storage disease had the beneficial effect of enabling the management of blood glucose levels without hypoglycemia.

  8. Reclamation and the Red Man: Relationships on the Truckee-Carson Project, Nevada

    ERIC Educational Resources Information Center

    Townley, John M.

    1978-01-01

    Four years after selection of the Western Nevada area for development as a federally-administered reclamation project, and but a single full season of farming, the Indian situation had assumed problem proportions to the Reclamation Service and the Truckee-Carson Project. (NQ)

  9. 77 FR 26040 - Notice of Proposed Information Collection for 1029-0061

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection for 1029-0061 AGENCY: Office of Surface Mining Reclamation and Enforcement. ACTION... Office of Surface Mining Reclamation and Enforcement (OSM) is announcing its intention to request renewed...

  10. 76 FR 46841 - Notice of Proposed Information Collection for 1029-0039

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ... Requirements for Reclamation and Operation Plans. DATES: Comments on the proposed information collection must... Requirements for Reclamation and Operation Plans. OMB Control Number: 1029-0039. Summary: Sections 507(b), 508... operations and reclamation plan and establish performance standards for the mining operation. Information...

  11. 75 FR 15453 - Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of Proposed Repayment Contract. SUMMARY: The Bureau of Reclamation will be initiating negotiations with the...

  12. 30 CFR 773.14 - Eligibility for provisionally issued permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... 773.14 Section 773.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... surface coal mining and reclamation operation with— (1) A notice of violation issued under § 843.12 of...

  13. 78 FR 63909 - Missouri Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 925... 08011000 SX066A00033 F13XS501520] Missouri Regulatory Program AGENCY: Office of Surface Mining Reclamation... hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM...

  14. 36 CFR 9.11 - Reclamation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Reclamation requirements. 9.11 Section 9.11 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.11 Reclamation requirements. (a) As contemporaneously as...

  15. 36 CFR 9.11 - Reclamation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Reclamation requirements. 9.11 Section 9.11 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.11 Reclamation requirements. (a) As contemporaneously as...

  16. 36 CFR 9.11 - Reclamation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Reclamation requirements. 9.11 Section 9.11 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.11 Reclamation requirements. (a) As contemporaneously as...

  17. 36 CFR 9.11 - Reclamation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Reclamation requirements. 9.11 Section 9.11 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.11 Reclamation requirements. (a) As contemporaneously as...

  18. 75 FR 877 - Cancellation of the South Valley Facilities Expansion Project-Clark County, NV

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-06

    ... DEPARTMENT OF INTERIOR Bureau of Reclamation Cancellation of the South Valley Facilities Expansion Project-- Clark County, NV AGENCY: Bureau of Reclamation, Interior. ACTION: Cancellation of Notice of Intent to prepare the Environmental Impact Statement. SUMMARY: The Bureau of Reclamation, together with...

  19. 77 FR 16259 - Notice of Proposed Information Collection for 1029-0059

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection for 1029-0059 AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior..., the Office of Surface Mining Reclamation and Enforcement (OSM) is announcing its intention to request...

  20. Historical trends of black carbon deposition in wetlands in Northeastern China

    NASA Astrophysics Data System (ADS)

    Gao, Chuanyu; Wang, Guoping; Knorr, Klaus-Holger

    2017-04-01

    Black carbon (BC) is produced by incomplete combustion of fossil fuels and biomass, and it is strongly influenced by human activities in recent hundreds years. Due to its refractory nature, BC is stored in sedimentary archives (e.g. wetland, lake sediments) and provides an ideal proxy to show historical fire frequency and regional BC emission. Increased slash-and-burn of pastures and forests during reclamation increases fire frequency, and thus influences regional BC emission and storage. However, few study investigated the influence of land use and land use change on regional BC deposition. To address this gap, we investigated BC deposition, and regional land use and settlement history in four wetland regions in Northeast of China: Sanjiang Plain, Changbai Mountain, Songnen Plain and Great Hinggan Mountain. People were encouraged by the government to settle in these regions and exploit natural resources after 1895. Our results showed that BC deposition fluxes in the different wetlands regions were around 10 (from 1 to 15) mg cm-2 yr-1 during the last 150 years, and were thus similar with results of studies on forest soils and higher than fluxes derived from other sedimentary archives. Wetland degradation caused by human reclamation and desertification in the surrounding landscape due to improper land use change BC storage and may also lead to BC losses in wetland soils. On the other hand, higher frequency of fire events caused by exploitation of resources lead to several peaks in BC deposition in the surrounding wetlands before the 1980s. After the 1980s, wild fires were controlled and forest protection policies were implemented by the government. This decreased regional fire frequency and thus BC deposition in the western region of Northeast of China. However, in the eastern regions, increasing anthropogenic impacts (e.g. industry sources) became the dominant factors on BC deposition and kept BC deposition fluxes increasing here.

  1. 30 CFR 785.12 - Special bituminous surface coal mining and reclamation operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Special bituminous surface coal mining and... ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL....12 Special bituminous surface coal mining and reclamation operations. (a) This section applies to any...

  2. 30 CFR 785.12 - Special bituminous surface coal mining and reclamation operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Special bituminous surface coal mining and... ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL....12 Special bituminous surface coal mining and reclamation operations. (a) This section applies to any...

  3. 30 CFR 785.12 - Special bituminous surface coal mining and reclamation operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Special bituminous surface coal mining and... ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL....12 Special bituminous surface coal mining and reclamation operations. (a) This section applies to any...

  4. 77 FR 8896 - Notice of Proposed Information Collection for 1029-0036

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... request for Surface Mining Permit Applications--Minimum Requirements for Reclamation and Operation Plan... Permit Applications-- Minimum Requirements for Reclamation and Operation Plan. OSM is requesting a 3-year... Requirements for Reclamation and Operation Plan. OMB Control Number: 1029-0036. SUMMARY: Sections 507(b), 508(a...

  5. 76 FR 73674 - Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Status Report of Water Service, Repayment, and Other Water- Related Contract Actions AGENCY: Bureau of Reclamation, Interior. ACTION: Notice. SUMMARY... INFORMATION CONTACT: Michelle Kelly, Water and Environmental Resources Division, Bureau of Reclamation, P.O...

  6. 76 FR 60527 - Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Status Report of Water Service, Repayment, and Other Water- Related Contract Actions AGENCY: Bureau of Reclamation, Interior. ACTION: Notice. SUMMARY... CONTACT: Michelle Kelly, Water and Environmental Resources Division, Bureau of Reclamation, P.O. Box 25007...

  7. 75 FR 82066 - Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Status Report of Water Service, Repayment, and Other Water- Related Contract Actions AGENCY: Bureau of Reclamation, Interior. ACTION: Notice. SUMMARY... CONTACT: Michelle Kelly, Water and Environmental Services Division, Bureau of Reclamation, P.O. Box 25007...

  8. 43 CFR 404.27 - How will Reclamation evaluate my request to review an appraisal investigation or feasibility...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to review an appraisal investigation or feasibility study completed without the support of... Reclamation evaluate my request to review an appraisal investigation or feasibility study completed without... appraisal investigation or feasibility study is eligible to be reviewed under the program. Reclamation will...

  9. 43 CFR 404.27 - How will Reclamation evaluate my request to review an appraisal investigation or feasibility...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... to review an appraisal investigation or feasibility study completed without the support of... Reclamation evaluate my request to review an appraisal investigation or feasibility study completed without... appraisal investigation or feasibility study is eligible to be reviewed under the program. Reclamation will...

  10. Trees for reclamation in the Eastern United States: a West Virginia perspective

    Treesearch

    James E. Pitsenbarger

    1980-01-01

    Traditionally, in West Virginia, trees have been an integral and important part of the reclamation program. Moreover with the advent of Public Law 95-87, it certainly would appear that trees are destined to play increasingly diverse and important roles in the field of reclamation.

  11. 78 FR 63911 - Montana Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 926...; S2D2SSS08011000 SX066A00033 F13XS501520] Montana Regulatory Program AGENCY: Office of Surface Mining Reclamation... regulatory program (hereinafter, the ``Montana program'') under the Surface Mining Control and Reclamation...

  12. 52. Photographic copy of construction drawing, U.S. Reclamation Service, December ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. Photographic copy of construction drawing, U.S. Reclamation Service, December 1911 (original drawing located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "Keechelus Dam - general plan of dam site." - Keechelus Dam, Yakima River, 10 miles northwest of Easton, Easton, Kittitas County, WA

  13. 43 CFR 404.11 - What type of assistance is available under the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.11 What type of assistance is available under the program? Under the Reclamation Rural Water Supply... rural water supply project for you, with your cooperation; (b) Request funding through a grant or...

  14. 77 FR 33766 - Agency Information Collection Activities; Renewal of a Currently Approved Information Collection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-07

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Agency Information Collection Activities; Renewal... Reclamation, Interior. ACTION: Notice of renewal and request for comments. SUMMARY: The Bureau of Reclamation... tribal organizations, to plan the design and construction of projects to serve rural areas with...

  15. 51. Photographic copy of construction drawing, U.S. Reclamation Service, August ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Photographic copy of construction drawing, U.S. Reclamation Service, August 1906 (original drawing located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "Crib dam at Lake Keechelus." - Keechelus Dam, Yakima River, 10 miles northwest of Easton, Easton, Kittitas County, WA

  16. 77 FR 5049 - Office of Surface Mining Reclamation and Enforcement; Notice of Proposed Information Collection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-01

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement; Notice of Proposed Information Collection for 1029-0103 AGENCY: Office of Surface Mining Reclamation and Enforcement... of 1995, the Office of Surface Mining (OSM) is announcing its intention to renew its authority for...

  17. 78 FR 41421 - Notice of Proposed Information Collection; Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-10

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement [S1D1S SS08011000... Collection; Request for Comments AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior..., the Office of Surface Mining Reclamation and Enforcement (OSM) is announcing its intention to request...

  18. 78 FR 66381 - Notice of Proposed Information Collection; Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-05

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement [S1D1S SS08011000... Collection; Request for Comments AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior..., the Office of Surface Mining Reclamation and Enforcement (OSM) is announcing that the information...

  19. 76 FR 20707 - Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [INT-FES 11-02] Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA AGENCY: Bureau of Reclamation, Interior... Fish Passage Facilities and Fish Reintroduction Project. SUMMARY: The Bureau of Reclamation...

  20. Trees for reclamation in the Eastern United States

    Treesearch

    C. W. Moody; Daniel T. Kimbrell

    1980-01-01

    The Alabama Forestry Commission promotes reclamation through forest resource education providing seedlings for reclamation and assistance to industry and landowners. Approximately 85% of the lands mined in 1979 will go into forest production. Good forest management on reclaimed lands will enable Alabama to meet its future demands for forest products.

  1. 30 CFR 886.21 - What must I report?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false What must I report? 886.21 Section 886.21 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION RECLAMATION GRANTS FOR UNCERTIFIED STATES AND INDIAN TRIBES § 886.21 What...

  2. Approaches to Post-Mining Land Reclamation in Polish Open-Cast Lignite Mining

    NASA Astrophysics Data System (ADS)

    Kasztelewicz, Zbigniew

    2014-06-01

    The paper presents the situation regarding the reclamation of post-mining land in the case of particular lignite mines in Poland until 2012 against the background of the whole opencast mining. It discusses the process of land purchase for mining operations and its sales after reclamation. It presents the achievements of mines in the reclamation and regeneration of post-mining land as a result of which-after development processes carried out according to European standards-it now serves the inhabitants as a recreational area that increases the attractiveness of the regions.

  3. An exploration of Bureau of Reclamation approaches for managing conflict over diverging science

    USGS Publications Warehouse

    Burkardt, Nina; Ruell, Emily; Clark, Douglas

    2008-01-01

    As a major institutional agent supplying Western water resources, the Bureau of Reclamation (Reclamation) provides important leadership, technical, and financial resources in water management, serving as the West's "water broker" (Bowersox 2000; Pisani 2003). In recent years, growing numbers of constituencies using water and the over-allocation of water resources have contributed to conflict over the resource in the American West (National Research Council 2004). Although the conflicts arise from many sources, one common theme is that Reclamation managers often must make decisions about water use and allocation when scientific studies provide uncertain or competing recommendations. We conducted a preliminary study of Reclamation water managers and water scientists to try to understand the approaches or techniques they use or consider useful for dealing with scientific conflicts over water allocation and how these compare to techniques found in the relevant literature. We report the results of (1) an electronic survey of Reclamation senior managers and (2) a panel discussion amongst Reclamation senior managers as to the current institutional capabilities for managing diverging scientific findings in water dispute resolution processes. We conclude with a discussion of the strengths and weaknesses of the different tools and techniques managers reported in the survey and in the panel discussion.

  4. Reclamation of mined lands in the western coal region

    USGS Publications Warehouse

    Narten, Perry F.; Litner, S.F.; Allingham, J.W.; Foster, Lee; Larsen, D.M.; McWreath, H.C.

    1983-01-01

    In 1978, a group of scientists from several Federal agencies examined reclamation work at 22 coal mines in seven western States. The results of these examinations were not used to derive quantitative predictions of the outcome of reclamation work but rather to determine the general requirements for revegetation success. Locally, reclamation efforts are affected by climate, especially precipitation; the landform of the restored surface; the nature of the overburden material; the nature of the surface soil; and the natural ecological system. The goals of reclamation efforts are now broader than ever. Regulations call not only for reducing the steepness of the final surface and establishing a cover of mostly perennial native vegetation, but for restoring the land for specific land uses, achieving diversity both in types of plants and in number of species, and reintroduction of biological and ecological processes. If specific sites are monitored over a long enough period of time, quantitative predictions of success for individual mines may be possible, and such predictions can be included in environmental impact statements to help in the decision-making process. The results of this study indicate that current reclamation objectives can be met when the reclamation effort is designed on the basis of site-specific needs and when existing technology is used.

  5. Establishment of warm-season native grasses and forbs on drastically disturbed lands

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, S.

    Establishment of warm-season native grasses and forbs (WSNGs) has been viewed by landowners, agronomists, natural resource managers and reclamation specialists as being too expensive and difficult, especially for reclamation, which requires early stand closure and erosion control. Natural resource managers have learned a great deal about establishing WSNGs since the implementation of the 1985 Farm Bill`s Conservation Reserve Program (CRP). Reclamation specialists must begin to use this information to improve reclamation success. Quality control of seed equipment and planting methods has been proven to be the crucial first step in successful establishment. Seedling germination, growth and development of WSNGs aremore » different from that of introduced cool-season grasses and legumes. Specialized seed drills and spring planting periods are essential. Because shoot growth lags far behind root growth the first two seasons, WSNGs often are rejected for reclamation use. Usually, the rejection is based on preconceived notions that bare ground will erode and on reclamation specialists` desire for a closed, uniform, grassy lawn. WSNG`s extensive root systems inhibit rill and gully erosion by the fall of the first season. Planting a weakly competitive, short-lived nurse crop such as perennial ryegrass (Lolium perenne) at low rates with the WSNG mixture can reduce first-season sheet and rill erosion problems and give an appearance of a closed stand. Benefits of WSNGs in soil building and their acid-tolerance make them ideal species for reclamation of drastically disturbed lands. WSNGs and forbs enhance wildlife habitat and promote natural succession and the invasion of the reclamation site by other native species, particularly hardwood trees, increasing diversity and integrating the site into the local ecosystem. This is perhaps their most important attribute. Most alien grasses and legumes inhibit natural succession, slowing the development of a stable mine soil ecosystem. This paper outlines one successful methodology to establish warm-season grasses and forbs on abandoned mine lands in Missouri. The methodology can be successfully adapted for reclamation of all drastically disturbed lands including Title V lands under the Surface Mining Control Reclamation Act of 1977 (PL95-87) to promote ecosystem diversity and stability.« less

  6. Cheaper Adjoints by Reversing Address Computations

    DOE PAGES

    Hascoët, L.; Utke, J.; Naumann, U.

    2008-01-01

    The reverse mode of automatic differentiation is widely used in science and engineering. A severe bottleneck for the performance of the reverse mode, however, is the necessity to recover certain intermediate values of the program in reverse order. Among these values are computed addresses, which traditionally are recovered through forward recomputation and storage in memory. We propose an alternative approach for recovery that uses inverse computation based on dependency information. Address storage constitutes a significant portion of the overall storage requirements. An example illustrates substantial gains that the proposed approach yields, and we show use cases in practical applications.

  7. 30 CFR 874.12 - Eligible coal lands and water.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Eligible coal lands and water. 874.12 Section... INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.12 Eligible coal lands and water. Coal lands and water are eligible for reclamation activities if— (a) They were mined for coal or...

  8. 30 CFR 874.12 - Eligible coal lands and water.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Eligible coal lands and water. 874.12 Section... INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.12 Eligible coal lands and water. Coal lands and water are eligible for reclamation activities if— (a) They were mined for coal or...

  9. 30 CFR 874.12 - Eligible coal lands and water.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Eligible coal lands and water. 874.12 Section... INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.12 Eligible coal lands and water. Coal lands and water are eligible for reclamation activities if— (a) They were mined for coal or...

  10. 30 CFR 874.12 - Eligible coal lands and water.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Eligible coal lands and water. 874.12 Section... INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.12 Eligible coal lands and water. Coal lands and water are eligible for reclamation activities if— (a) They were mined for coal or...

  11. 30 CFR 874.12 - Eligible coal lands and water.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Eligible coal lands and water. 874.12 Section... INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.12 Eligible coal lands and water. Coal lands and water are eligible for reclamation activities if— (a) They were mined for coal or...

  12. 43 CFR 422.10 - Requirements for authorizing officers to exercise Reclamation law enforcement authority.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Requirements for authorizing officers to exercise Reclamation law enforcement authority. 422.10 Section 422.10 Public Lands: Interior Regulations... exercise Reclamation law enforcement authority. (a) The CLEO must ensure that each officer receiving an...

  13. 43 CFR 422.10 - Requirements for authorizing officers to exercise Reclamation law enforcement authority.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Requirements for authorizing officers to exercise Reclamation law enforcement authority. 422.10 Section 422.10 Public Lands: Interior Regulations... exercise Reclamation law enforcement authority. (a) The CLEO must ensure that each officer receiving an...

  14. 43 CFR 422.10 - Requirements for authorizing officers to exercise Reclamation law enforcement authority.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Requirements for authorizing officers to exercise Reclamation law enforcement authority. 422.10 Section 422.10 Public Lands: Interior Regulations... exercise Reclamation law enforcement authority. (a) The CLEO must ensure that each officer receiving an...

  15. 43 CFR 422.10 - Requirements for authorizing officers to exercise Reclamation law enforcement authority.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Requirements for authorizing officers to exercise Reclamation law enforcement authority. 422.10 Section 422.10 Public Lands: Interior Regulations... exercise Reclamation law enforcement authority. (a) The CLEO must ensure that each officer receiving an...

  16. 76 FR 66964 - Notice of Proposed Information Collection for 1029-0036

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ... Requirements for Reclamation and Operation Plan. This information collection activity was previously approved... Requirements for Reclamation and Operation Plan. OSM will request a 3-year term of approval for this... Reclamation and Operation Plan. OMB Control Number: 1029-0036. Summary: Sections 507(b), 508(a), 510(b), 515(b...

  17. Facility-Scale Solar Photovoltaic Guidebook: Bureau of Reclamation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kiatreungwattana, Kosol; VanGeet, Otto; Stoltenberg, Blaise

    2016-09-01

    This guidebook was written for the U.S. Bureau of Reclamation to explore the use of non-hydro renewable energy resources to meet the U.S. Department of Interior's objectives and Reclamation's mission. This guidebook presents readers with the processes and steps needed to assess and successfully implement facility-scale solar projects.

  18. 43 CFR 404.49 - What criteria will Reclamation use to determine whether to recommend that a proposed rural water...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... opportunities for water conservation through structural or non-structural approaches and demonstration... determine whether to recommend that a proposed rural water supply project be authorized for construction... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.49...

  19. 30 CFR 884.17 - Other uses by certified States and Indian tribes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... tribes. 884.17 Section 884.17 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... certified States and Indian tribes. (a) The State reclamation plan may provide for construction of specific... applications for uses other than coal reclamation by certified States and Indian tribes may be submitted in...

  20. 30 CFR 884.17 - Other uses by certified States and Indian tribes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... tribes. 884.17 Section 884.17 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... certified States and Indian tribes. (a) The State reclamation plan may provide for construction of specific... applications for uses other than coal reclamation by certified States and Indian tribes may be submitted in...

  1. Agricultural field reclamation utilizing native grass crop production

    Treesearch

    J. Cure

    2013-01-01

    Developing a method of agricultural field reclamation to native grasses in the Lower San Pedro Watershed could prove to be a valuable tool for educational and practical purposes. Agricultural field reclamation utilizing native grass crop production will address water table depletion, soil degradation and the economic viability of the communities within the watershed....

  2. 43 CFR 422.10 - Requirements for authorizing officers to exercise Reclamation law enforcement authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Requirements for authorizing officers to exercise Reclamation law enforcement authority. 422.10 Section 422.10 Public Lands: Interior Regulations... exercise Reclamation law enforcement authority. (a) The CLEO must ensure that each officer receiving an...

  3. 78 FR 66671 - Oklahoma Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-06

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 936...; S2D2SSS08011000SX066A00033F13XS501520] Oklahoma Regulatory Program AGENCY: Office of Surface Mining Reclamation and Enforcement... amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are announcing...

  4. 30 CFR 886.17 - How can my grant be amended?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false How can my grant be amended? 886.17 Section 886.17 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION RECLAMATION GRANTS FOR UNCERTIFIED STATES AND INDIAN TRIBES § 886.17 How can...

  5. 43 CFR 404.50 - What information will be included in the feasibility report prepared by Reclamation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY... finding as to whether the proposed rural water supply project is feasible and the reasons supporting that determination; (b) A recommendation to Congress regarding whether or not the proposed rural water supply project...

  6. 77 FR 52758 - Agency Information Collection Activities under OMB Review; Renewal of a Currently Approved...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... OMB Review; Renewal of a Currently Approved Collection; Reclamation Rural Water Supply Program AGENCY... and Budget (OMB) for review and approval: Reclamation Rural Water Supply Program, OMB Control Number... Supply Program (Rural Water Program) to submit information to allow the Bureau of Reclamation to evaluate...

  7. 30 CFR 780.23 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... If the premining use of the land was changed within 5 years before the anticipated date of beginning... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reclamation plan: Land use information. 780.23... PLAN § 780.23 Reclamation plan: Land use information. (a) The plan shall contain a statement of the...

  8. 30 CFR 784.15 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... If the premining use of the land was changed within 5 years before the anticipated date of beginning... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reclamation plan: Land use information. 784.15... PLAN § 784.15 Reclamation plan: Land use information. (a) The plan shall contain a statement of the...

  9. 43 CFR 423.13 - How will Reclamation establish periodic and regular closures?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FACILITIES, LANDS, AND WATERBODIES Areas Open and Closed to Public Use § 423.13 How will Reclamation... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation establish periodic and regular closures? 423.13 Section 423.13 Public Lands: Interior Regulations Relating to Public...

  10. 30 CFR 880.5 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... whose purpose is to control or extinguish fires in coal formations. (h) Reclamation plan or State reclamation plan means a plan that a State or Indian tribe submitted and that we approved under section 405 of... LAND RECLAMATION MINE FIRE CONTROL § 880.5 Definitions. As used in the regulations in this part and in...

  11. 30 CFR 880.5 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... whose purpose is to control or extinguish fires in coal formations. (h) Reclamation plan or State reclamation plan means a plan that a State or Indian tribe submitted and that we approved under section 405 of... LAND RECLAMATION MINE FIRE CONTROL § 880.5 Definitions. As used in the regulations in this part and in...

  12. 43 CFR 429.33 - What are the consequences for using Reclamation land, facilities, and waterbodies without...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What are the consequences for using Reclamation land, facilities, and waterbodies without authorization? 429.33 Section 429.33 Public Lands... Land, Facilities, and Waterbodies § 429.33 What are the consequences for using Reclamation land...

  13. 30 CFR 906.20 - Approval of Colorado abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Colorado abandoned mine land reclamation plan. 906.20 Section 906.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE COLORADO...

  14. Chapter 2: The forestry reclamation approach

    Treesearch

    Jim Burger; Don Graves; Patrick Angel; Vic Davis; Carl Zipper

    2017-01-01

    The Forestry Reclamation Approach (FRA) is a method for reclaiming coal-mined land to forest under the federal Surface Mining Control and Reclamation Act of 1977 (SMCRA). The FRA is based on knowledge gained from both scientific research and experience (Fig. 2-1). The FRA can achieve cost-effective regulatory compliance for mine operators while creating productive...

  15. Determination of optimal environmental policy for reclamation of land unearthed in lignite mines - Strategy and tactics

    NASA Astrophysics Data System (ADS)

    Batzias, Dimitris F.; Pollalis, Yannis A.

    2012-12-01

    In this paper, optimal environmental policy for reclamation of land unearthed in lignite mines is defined as a strategic target. The tactics concerning the achievement of this target, includes estimation of optimal time lag between each lignite site (which is a segment of the whole lignite field) complete exploitation and its reclamation. Subsidizing of reclamation has been determined as a function of this time lag and relevant implementation is presented for parameter values valid for the Greek economy. We proved that the methodology we have developed gives reasonable quantitative results within the norms imposed by legislation. Moreover, the interconnection between strategy and tactics becomes evident, since the former causes the latter by deduction and the latter revises the former by induction in the time course of land reclamation.

  16. Master/Programmable-Slave Computer

    NASA Technical Reports Server (NTRS)

    Smaistrla, David; Hall, William A.

    1990-01-01

    Unique modular computer features compactness, low power, mass storage of data, multiprocessing, and choice of various input/output modes. Master processor communicates with user via usual keyboard and video display terminal. Coordinates operations of as many as 24 slave processors, each dedicated to different experiment. Each slave circuit card includes slave microprocessor and assortment of input/output circuits for communication with external equipment, with master processor, and with other slave processors. Adaptable to industrial process control with selectable degrees of automatic control, automatic and/or manual monitoring, and manual intervention.

  17. Response of soil physicochemical properties and enzyme activities to long-term reclamation of coastal saline soil, Eastern China.

    PubMed

    Xie, Xuefeng; Pu, Lijie; Wang, Qiqi; Zhu, Ming; Xu, Yan; Zhang, Meng

    2017-12-31

    Soil enzyme activity during different years of reclamation and land use patterns could indicate changes in soil quality. The objective of this research is to explore the dynamics of 5 soil enzyme activities (dehydrogenase, amylase, urease, acid phosphatase and alkaline phosphatase) involved in C, N, and P cycling and their responses to changes in soil physicochemical properties resulting from long-term reclamation of coastal saline soil. Soil samples from a total of 55 sites were collected from a coastal reclamation area with different years of reclamation (0, 7, 32, 40, 63a) in this study. The results showed that both long-term reclamation and land use patterns have significant effects on soil physicochemical properties and enzyme activities. Compared with the bare flat, soil water content, soil bulk density, pH and electrical conductivity showed a decreasing trend after reclamation, whereas soil organic carbon, total nitrogen and total phosphorus tended to increase. Dehydrogenase, amylase and acid phosphatase activities initially increased and then decreased with increasing years of reclamation, whereas urease and alkaline phosphatase activities were characterized by an increase-decrease-increase trend. Moreover, urease, acid phosphatase and alkaline phosphatase activities exhibited significant differences between coastal saline soil with 63years of reclamation and bare flat, whereas dehydrogenase and amylase activities remained unchanged. Aquaculture ponds showed higher soil water content, pH and EC but lower soil organic carbon, total nitrogen and total phosphorus than rapeseed, broad bean and wheat fields. Rapeseed, broad bean and wheat fields displayed higher urease and alkaline phosphatase activities and lower dehydrogenase, amylase and acid phosphatase activities compared with aquaculture ponds. Redundancy analysis revealed that the soil physicochemical properties explained 74.5% of the variation in soil enzyme activities and that an obvious relationship existed between soil nutrients and soil enzyme activities. These results will assist governmental evaluation of the quality of reclaimed coastal soil. Copyright © 2017 Elsevier B.V. All rights reserved.

  18. The impacts of land reclamation on suspended-sediment dynamics in Jiaozhou Bay, Qingdao, China

    NASA Astrophysics Data System (ADS)

    Gao, Guan Dong; Wang, Xiao Hua; Bao, Xian Wen; Song, Dehai; Lin, Xiao Pei; Qiao, Lu Lu

    2018-06-01

    A three-dimensional, high-resolution tidal model coupled with the UNSW sediment model (UNSW-Sed) based on Finite Volume Coastal Ocean Model (FVCOM) was set up to study the suspended-sediment dynamics and its change in Jiaozhou Bay (JZB) due to land reclamation over the period 1935 to 2008. During the past decades, a large amount of tidal flats were lost due to land reclamation. Other than modulating the tides, the tidal flats are a primary source for sediment resuspensions, leading to turbidity maxima nearshore. The tidal dynamics are dominant in controlling the suspended-sediment dynamics in JZB and have experienced significant changes with the loss of tidal flats due to the land reclamation. The sediment model coupled with the tide model was used to investigate the changes in suspended-sediment dynamics due to the land reclamation from 1935 to 2008, including suspended-sediment concentrations (SSC) and the horizontal suspended-sediment fluxes. This model can predict the general patterns of the spatial and temporal variation of SSC. The model was applied to investigate how the net transport of suspended sediments between JZB and its adjacent sea areas changed with land reclamation: in 1935 the net movement of suspended sediments was from JZB to the adjacent sea (erosion for JZB), primarily caused by horizontal advection associated with a horizontal gradient in the SSC; This seaward transport (erosion for JZB) had gradually declined from 1935 to 2008. If land reclamation on a large scale is continued in future, the net transport between JZB and the adjacent sea would turn landward and JZB would switch from erosion to siltation due to the impact of land reclamation on the horizontal advection of suspended sediments. We also evaluate the primary physical mechanisms including advection of suspended sediments, settling lag and tidal asymmetry, which control the suspended-sediment dynamics with the process of land reclamation.

  19. Disputes over science and dispute resolution approaches - A survey of Bureau of Reclamation employees

    USGS Publications Warehouse

    Burkardt, Nina; Ruell, Emily W.

    2012-01-01

    Water resources in parts of the Western United States are over-allocated, which intensifies the pressure to support water management decisions with strong scientific evidence. Because scientific studies sometimes provide uncertain or competing results or recommendations, science can become a source of disputes during decision-making processes. The Bureau of Reclamation (Reclamation) is an important water manager in the Western United States, and Reclamation decision processes are often contested by a variety of affected constituencies. We conducted a Web-based survey of Reclamation employees to determine (1) which types of disputes over science are occurring and how common they are, (2) which approaches have been used by Reclamation to try to resolve these different types of disputes, (3) how useful Reclamation employees find these approaches at resolving these types of disputes, (4) the final outcomes of these disputes and the decision-making processes that were hindered by the disputes over science, and (5) the potential usefulness of several different types of dispute resolution resources that Reclamation could provide for employees that become involved in disputes over science. The calculated minimum response rate for the survey was 59 percent. Twenty-five percent of respondents indicated that they had been involved in a dispute over science while working at Reclamation. Native species and species listed under the Endangered Species Act of 1973 were the most common issue types reported in these disputes over science. Survey respondents indicated that they used a variety of approaches to resolve disputes over science and rated most approaches as either neutral or somewhat helpful in these endeavors. Future research is needed to determine whether there are additional variables underlying these disputes that were not measured in this survey that may identify when dispute resolution methods are most effective, or whether resolving aspects of these disputes, such as differing interpretations of science, is very difficult or impossible regardless of the dispute resolution methods used.

  20. Hydrologic characteristics of surface-mined land reclaimed by sludge irrigation, Fulton County, Illinois

    USGS Publications Warehouse

    Patterson, G.L.; Fuentes, R.F.; Toler, L.G.

    1982-01-01

    Analyses of water samples collected at four stream-monitoring stations, in an area surface mined for coal and being reclaimed by sludge irrigation, show the principal metals are sodium, calcium, and magnesium and principal non-metals are chloride, sulfate, and bicarbonate. Comparing yearly mean chemical concentrations shows no changing trends since reclamation began, nor are there differences between stations upstream and downstream from the site. Yearly suspended-sediment loads and discharge relations upstream and downstream from the site also show no differences. Discharge hydrographs of two streams draining the site show a delayed response to precipitation due to the storage capacity of several upstream strip-mine lakes. The water-table surface generally follows the irregular topography. Monthly water-level fluctuations were dependent on the surface material (mined or unmined) and proximity to surface discharge. The largest fluctuations were in unmined land away from discharge while the smallest were in mined land near discharge. The water table is closer to the surface in unmined land. Analyses of water samples from 70 wells within or adjacent to the reclamation site showed no differences in water quality which could be attributed to sludge or supernatant application. Samples from wells in mined land, however, had higher concentrations of dissolved sulfate, calcium, magnesium, chloride, iron, zinc, and manganese than samples from wells in unmined land. (USGS)

  1. Effects of surface coal mining and reclamation on the geohydrology of six small watersheds in West-Central Indiana

    USGS Publications Warehouse

    Martin, Jeffrey D.; Duwelius, Richard F.; Crawford, Charles G.

    1990-01-01

    Hydrologic effects of mining and reclamation were identified by comparing the hydrologic systems at mined and reclaimed watersheds with those at unmined agricultural watersheds. The presence or absence of a large final-cut lake in the reclaimed watershed greatly influences the hydrologic systems and the effects of mining and reclamation. Surface coal mining and reclamation can decrease base flow, annual runoff, and peak flow rates; increase the variability of flow and recharge to the bedrock; reestablish the premining relation between surface- and ground-water divides; and lower the water table in upland areas.

  2. The reclamation of Indian and Abrams creeks in Great Smoky Mountains National Park

    USGS Publications Warehouse

    Lennon, Robert E.; Parker, Phillip S.

    1959-01-01

    A complete program of stream reclamation was developed and applied on Indian and Abrams creeks in Great Smoky Mountains National Park. A salt-resistivity technique was used to estimate the dilution and velocity of a toxicant in running water. Streamside toxicity trials on resident fishes established minimal, effective concentrations of the rotenone material. The successful removals of undesirable fish were followed by restocking with selected strains of eastern brook trout and rainbow trout. Post-reclamation observations demonstrated enhanced survival, growth, reproduction, and catch of trout. Factors which might limit the effectiveness of stream reclamation programs ar e discussed.

  3. Development assessment of wash water reclamation

    NASA Technical Reports Server (NTRS)

    Putnam, D. F.

    1976-01-01

    An analytical study assessment of state-of-the-art wash water reclamation technology is presented. It covers all non-phase-change unit operations, unit processes and subsystems currently under development by NASA. Each approach to wash water reclamation is described in detail. Performance data are given together with the projected weights and sizes of key components and subsystems. It is concluded that a simple multifiltration subsystem composed of surface-type cartridge filters, carbon adsorption and ion exchange resins is the most attractive approach for spacecraft wash water reclamation in earth orbital missions of up to 10 years in duration.

  4. Biodegradation of N-nitrosodimethylamine in soil from a water reclamation facility

    USGS Publications Warehouse

    Bradley, Paul M.; Carr, Steve A.; Baird, Rodger B.; Chapelle, Francis H.

    2005-01-01

    The potential introduction of N-nitrosodimethylamine (NDMA) into groundwater during water reclamation activities poses a significant risk to groundwater drinking supplies. Greater than 54% biodegradation of N-[methyl-14C]NDMA to 14CO2 or to 14CO2 and 14CH4 was observed in soil from a water reclamation facility under oxic or anoxic conditions, respectively. Likewise, biodegradation was significant in microcosms containing soil with no history of NDMA contamination. These results indicate that aerobic and anaerobic biodegradation of NDMA may be an effective component of NDMA attenuation in water reclamation facility soils.

  5. Cost comparison of full-scale water reclamation technologies with an emphasis on membrane bioreactors.

    PubMed

    Iglesias, Raquel; Simón, Pedro; Moragas, Lucas; Arce, Augusto; Rodriguez-Roda, Ignasi

    2017-06-01

    The paper assesses the costs of full-scale membrane bioreactors (MBRs). Capital expenditures (CAPEX) and operating expenses (OPEX) of Spanish MBR facilities have been verified and compared to activated sludge plants (CAS) using water reclamation treatment (both conventional and advanced). Spanish MBR facilities require a production of 0.6 to 1.2 kWh per m 3 , while extended aeration (EA) and advanced reclamation treatment require 1.2 kWh per m 3 . The energy represents around 40% of the OPEX in MBRs. In terms of CAPEX, the implementation costs of a CAS facility followed by conventional water reclamation treatment (physical-chemical + sand filtration + disinfection) ranged from 730 to 850 €.m -3 d, and from 1,050 to 1,250 €.m -3 d in the case of advanced reclamation treatment facilities (membrane filtration) with a capacity of 8,000 to 15,000 m 3 d -1 . The MBR cost for similar capacities ranges between 700 and 960 €.m -3 d. This study shows that MBRs that have been recently installed represent a cost competitive option for water reuse applications for medium and large capacities (over 10,000 m 3 d -1 ), with similar OPEX to EA and conventional water reclamation treatment. In terms of CAPEX, MBRs are cheaper than EA, followed by advanced water reclamation treatment.

  6. A system for automatically recording weight changes in sapling trees

    Treesearch

    Harold F. Haupt; Bud L. Jeffers

    1967-01-01

    Describes an accurate and simple system for taking continuous weight records of sapling-size trees. Measurements obtained using this system have helped in describing the mechanism of interception storage in tree crowns during snowfall.

  7. Automatic dispensing of liquid nitrogen in submilliliter doses

    NASA Astrophysics Data System (ADS)

    Milner, C. J.

    1984-10-01

    Well-controlled doses of 0.2 to 0.5 ml of liquid nitrogen are delivered, on electrical signal (not more than once per 5 s), as fills of a miniature bucket raised by an automatic hoist. The bucket is lifted, brimming, from the storage flask and then moved sideways until over the receiver. At this point, a steel ball, which has been resting in and sealing a drain hole in the bucket, is lifted from its seat by a magnet fixed alongside the (now descending) bucket. Design features are outlined: some alternative designs, valving liquid through a short drain tube fixed in the storage flask, are briefly reviewed. In tests the device delivered 74 g (approx. 260 doses) during 63 min, the loss by evaporation meanwhile being 11 g from the bucket, implying a transfer efficiency of 87%. An indirect measure indicated the dose sizes as 354±10 μl approximately.

  8. Student Responses to the Women's Reclamation Work in the Philosophy of Education

    ERIC Educational Resources Information Center

    Wojcik, Teresa Genevieve; Titone, Connie

    2013-01-01

    Reclamation work denotes the process of uncovering the lost contributions of women to the philosophy of education, analyzing their works, making them accessible to a larger audience, and (re)introducing them to the historical record and canon. Since the 1970s, scholars have been engaged in the reclamation work, thus making available to students,…

  9. 43 CFR 404.48 - What process will Reclamation follow to determine if a feasibility study is ready for review?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... determine if a feasibility study is ready for review? 404.48 Section 404.48 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.48 What process will Reclamation follow to determine if a feasibility study is ready for review? (a) Reclamation will evaluate whether the feasibility study adequately...

  10. Current reclamation practices after oil and gas development do not speed up succession or plant community recovery in big sagebrush ecosystems in Wyoming

    USDA-ARS?s Scientific Manuscript database

    Reclamation is an application of treatment(s) following disturbance to promote succession and accelerate the return of target conditions. Previous studies have framed reclamation in the context of succession by studying its effectiveness in re-establishing late-successional plant communities. Re-est...

  11. 76 FR 58035 - Notice of Inventory Completion: U.S. Department of the Interior, Bureau of Reclamation, Phoenix...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-19

    .... Department of the Interior, Bureau of Reclamation, Phoenix Area Office, Phoenix, AZ and Arizona State Museum... Bureau of Reclamation, Phoenix Area Office and Arizona State Museum have completed an inventory of a... in the physical custody of the Arizona State Museum, University of Arizona, Tucson, AZ. The human...

  12. 43 CFR 404.28 - Is it possible to expedite the completion of an appraisal investigation or feasibility study?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... served by a proposed rural water supply project has urgent and compelling water needs, Reclamation will... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.28 Is it possible to expedite the completion of an appraisal investigation...

  13. 30 CFR 935.25 - Approval of Ohio abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Plan to provide for the reclamation of areas causing acid mine drainage AMD and to revise the project... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of Ohio abandoned mine land... STATE OHIO § 935.25 Approval of Ohio abandoned mine land reclamation plan amendments. The following is a...

  14. 30 CFR 935.25 - Approval of Ohio abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Plan to provide for the reclamation of areas causing acid mine drainage AMD and to revise the project... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of Ohio abandoned mine land... STATE OHIO § 935.25 Approval of Ohio abandoned mine land reclamation plan amendments. The following is a...

  15. 30 CFR 935.25 - Approval of Ohio abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Plan to provide for the reclamation of areas causing acid mine drainage AMD and to revise the project... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Approval of Ohio abandoned mine land... STATE OHIO § 935.25 Approval of Ohio abandoned mine land reclamation plan amendments. The following is a...

  16. 30 CFR 935.25 - Approval of Ohio abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Plan to provide for the reclamation of areas causing acid mine drainage AMD and to revise the project... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of Ohio abandoned mine land... STATE OHIO § 935.25 Approval of Ohio abandoned mine land reclamation plan amendments. The following is a...

  17. 78 FR 54910 - Notice of Intent To Prepare an Environmental Impact Statement and Public Scoping Meetings for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [A10-1523-2000-229-00-0-1, 3205000] Notice of... Apache Tribe Rural Water System Project, Arizona AGENCY: Bureau of Reclamation, Interior. ACTION: Notice... Act of 2010), the United States Congress authorized and directed Reclamation to plan, design, and...

  18. 31 CFR 240.9 - Reclamation procedures; reclamation protests.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... reclamation debt through offset in accordance with §§ 240.10 and 240.11. (5) Effect of protest decision. The..., by filing a protest in accordance with § 240.9(b), request Treasury to review its decision that the... debtor of Treasury's decision. In those cases where it is not possible to render a decision within 60...

  19. 30 CFR 886.18 - What audit and administrative requirements must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false What audit and administrative requirements must I meet? 886.18 Section 886.18 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION RECLAMATION GRANTS FOR UNCERTIFIED STATES AND INDIAN TRIBES § 886.18 What audit and...

  20. 30 CFR 902.20 - Approval of Alaska abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Alaska abandoned mine land reclamation plan. 902.20 Section 902.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT..., Denver, Colorado 80202-5733. [60 FR 33724, June 29, 1995, as amended at 60 FR 54593, Oct. 25, 1995] ...

  1. Study on the cumulative impact of reclamation activities on ecosystem health in coastal waters.

    PubMed

    Shen, Chengcheng; Shi, Honghua; Zheng, Wei; Li, Fen; Peng, Shitao; Ding, Dewen

    2016-02-15

    The purpose of this study is to develop feasible tools to investigate the cumulative impact of reclamations on coastal ecosystem health, so that the strategies of ecosystem-based management can be applied in the coastal zone. An indicator system and model were proposed to assess the cumulative impact synthetically. Two coastal water bodies, namely Laizhou Bay (LZB) and Tianjin coastal waters (TCW), in the Bohai Sea of China were studied and compared, each in a different phase of reclamations. Case studies showed that the indicator scores of coastal ecosystem health in LZB and TCW were 0.75 and 0.68 out of 1.0, respectively. It can be concluded that coastal reclamations have a historically cumulative effect on benthic environment, whose degree is larger than that on aquatic environment. The ecosystem-based management of coastal reclamations should emphasize the spatially and industrially intensive layout. Copyright © 2015 Elsevier Ltd. All rights reserved.

  2. Stochastic Modeling as a Means of Automatic Speech Recognition

    DTIC Science & Technology

    1975-04-01

    companng ihc features of different speech recognition systems, attention is often focused on thc control structures and the methods o’ communication...with no need to use secondary storage . Note that we go from a group of separate knowledge sources to an integrated network representation in...exhaust the available lime or storage . - - - . . 1- .-.-.. mmm^~ i — ■ ■ ’ ■ C haplcr I - IN I ROÜliCl ION Page 13 On the other hand

  3. Army Staff Automated Administrative Support System (ARSTADS) Report. Phase I. Volume II.

    DTIC Science & Technology

    1980-07-01

    requirements to transmit data with short fuse. This requirement varies from 1-6 times daily throughout the agency. Media used for transmission varies from...material automatically onto magnetic media . (1) Advantages. (a) Eliminates need for second or more typings of material. (b) Can be extremely cost...reduced and other methods of storage media will be possible. VI-1 LOmni (App 6 Contd) B. ZXJXM: Offices are over crowded with record storage containers

  4. A PROPOSED CHEMICAL INFORMATION AND DATA SYSTEM. VOLUME I.

    DTIC Science & Technology

    CHEMICAL COMPOUNDS, *DATA PROCESSING, *INFORMATION RETRIEVAL, * CHEMICAL ANALYSIS, INPUT OUTPUT DEVICES, COMPUTER PROGRAMMING, CLASSIFICATION...CONFIGURATIONS, DATA STORAGE SYSTEMS, ATOMS, MOLECULES, PERFORMANCE( ENGINEERING ), MAINTENANCE, SUBJECT INDEXING, MAGNETIC TAPE, AUTOMATIC, MILITARY REQUIREMENTS, TYPEWRITERS, OPTICS, TOPOLOGY, STATISTICAL ANALYSIS, FLOW CHARTING.

  5. 46 CFR 112.30-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...

  6. 46 CFR 112.30-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...

  7. 46 CFR 112.30-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...

  8. 46 CFR 112.30-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...

  9. 46 CFR 112.30-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-1 General. This subpart contains requirements applicable to emergency power installations having...

  10. Dynamic Information and Library Processing.

    ERIC Educational Resources Information Center

    Salton, Gerard

    This book provides an introduction to automated information services: collection, analysis, classification, storage, retrieval, transmission, and dissemination. An introductory chapter is followed by an overview of mechanized processes for acquisitions, cataloging, and circulation. Automatic indexing and abstracting methods are covered, followed…

  11. 43 CFR 3809.598 - What if the amount forfeited will not cover the cost of reclamation?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false What if the amount forfeited will not cover the cost of reclamation? 3809.598 Section 3809.598 Public Lands: Interior Regulations Relating to....598 What if the amount forfeited will not cover the cost of reclamation? If the amount forfeited is...

  12. 43 CFR 3809.598 - What if the amount forfeited will not cover the cost of reclamation?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false What if the amount forfeited will not cover the cost of reclamation? 3809.598 Section 3809.598 Public Lands: Interior Regulations Relating to....598 What if the amount forfeited will not cover the cost of reclamation? If the amount forfeited is...

  13. 43 CFR 3809.598 - What if the amount forfeited will not cover the cost of reclamation?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false What if the amount forfeited will not cover the cost of reclamation? 3809.598 Section 3809.598 Public Lands: Interior Regulations Relating to....598 What if the amount forfeited will not cover the cost of reclamation? If the amount forfeited is...

  14. 43 CFR 3809.598 - What if the amount forfeited will not cover the cost of reclamation?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false What if the amount forfeited will not cover the cost of reclamation? 3809.598 Section 3809.598 Public Lands: Interior Regulations Relating to....598 What if the amount forfeited will not cover the cost of reclamation? If the amount forfeited is...

  15. 43 CFR 404.34 - Can Reclamation reduce the amount of non-Federal cost-share required for a feasibility study?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-Federal cost-share required for a feasibility study? 404.34 Section 404.34 Public Lands: Interior... for a feasibility study? Yes. Reclamation may reduce the non-Federal cost-share required for a feasibility study to an amount less than 50 percent of the study costs if: (a) Reclamation determines that...

  16. 43 CFR 404.24 - How will Reclamation determine whether it is cost-effective for me or my contractor to conduct...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Reclamation will notify you in writing of its determination regarding the cost-effectiveness of your proposal... is cost-effective for me or my contractor to conduct the appraisal investigation or feasibility study... Reclamation determine whether it is cost-effective for me or my contractor to conduct the appraisal...

  17. 77 FR 65403 - Public Land Order No. 7804; Partial Revocation of a Secretarial Order Dated December 4, 1909; ID

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... Secretarial Order insofar as it affects 78.69 acres of National Forest System land withdrawn on behalf of the Bureau of Reclamation for the Payette Boise Reclamation Project within the Boise National Forest. This... Payette Boise Reclamation Project within the Boise National Forest is no longer used for the purpose for...

  18. An evaluation of reclamation tree planting in southwest Virginia

    Treesearch

    Danny R. Brown; Donald L. Branson

    1980-01-01

    Surface mining began in Southwest Virginia in the mid-1940's, however, few or no records were kept before 1950 and it was not until 1966 that the first Virginia reclamation law was passed. Two years later in 1968, the Division of Mined Land Reclamation was created and tree planting began on a uniform basis in Virginia surface mines.

  19. 43 CFR 404.39 - What factors will Reclamation consider in evaluating my capability to pay 25 percent or more of...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.39 What factors will Reclamation consider in... from water sales minus payments to supplies and employees); (7) Current (current bonds payable and... governments; (e) The existing cost of water and the cost to develop new water supplies in the region; and (f...

  20. 43 CFR 404.7 - What types of projects are eligible for consideration under the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.7... consideration under the program, a rural water supply project must: (a) Meet the definition of a rural water supply project in § 404.2; and (b) Be located in a Reclamation State, as defined in § 404.2. ...

  1. 78 FR 28894 - Public Land Order No. 7814; Partial Revocation of Bureau of Reclamation Order Dated July 11, 1955...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [NEW 149341 and NEW 179095] Public Land Order No. 7814; Partial Revocation of Bureau of Reclamation Order Dated July 11, 1955, and Transfer of... Land Order. SUMMARY: This order revokes in-part a withdrawal created by a Bureau of Reclamation Order...

  2. Research on Key Technologies of Cloud Computing

    NASA Astrophysics Data System (ADS)

    Zhang, Shufen; Yan, Hongcan; Chen, Xuebin

    With the development of multi-core processors, virtualization, distributed storage, broadband Internet and automatic management, a new type of computing mode named cloud computing is produced. It distributes computation task on the resource pool which consists of massive computers, so the application systems can obtain the computing power, the storage space and software service according to its demand. It can concentrate all the computing resources and manage them automatically by the software without intervene. This makes application offers not to annoy for tedious details and more absorbed in his business. It will be advantageous to innovation and reduce cost. It's the ultimate goal of cloud computing to provide calculation, services and applications as a public facility for the public, So that people can use the computer resources just like using water, electricity, gas and telephone. Currently, the understanding of cloud computing is developing and changing constantly, cloud computing still has no unanimous definition. This paper describes three main service forms of cloud computing: SAAS, PAAS, IAAS, compared the definition of cloud computing which is given by Google, Amazon, IBM and other companies, summarized the basic characteristics of cloud computing, and emphasized on the key technologies such as data storage, data management, virtualization and programming model.

  3. Mechanization for Optimal Landscape Reclamation

    NASA Astrophysics Data System (ADS)

    Vondráčková, Terezie; Voštová, Věra; Kraus, Michal

    2017-12-01

    Reclamation is a method of ultimate utilization of land adversely affected by mining or other industrial activity. The paper explains the types of reclamation and the term “optimal reclamation”. Technological options of the long-lasting process of mine dumps reclamation starting with the removal of overlying rocks, transport and backfilling up to the follow-up remodelling of the mine dumps terrain. Technological units and equipment for stripping flow division. Stripping flow solution with respect to optimal reclamation. We recommend that the application of logistic chains and mining simulation with follow-up reclamation to open-pit mines be used for the implementation of optimal reclamation. In addition to a database of local heterogeneities of the stripped soil and reclaimed land, the flow of earths should be resolved in a manner allowing the most suitable soil substrate to be created for the restoration of agricultural and forest land on mine dumps. The methodology under development for the solution of a number of problems, including the geological survey of overlying rocks, extraction of stripping, their transport and backfilling in specified locations with the follow-up deployment of goal-directed reclamation. It will make possible to reduce the financial resources needed for the complex process chain by utilizing GIS, GPS and DGPS technologies, logistic tools and synergistic effects. When selecting machines for transport, moving and spreading of earths, various points of view and aspects must be taken into account. Among such aspects are e.g. the kind of earth to be operated by the respective construction machine, the kind of work activities to be performed, the machine’s capacity, the option to control the machine’s implement and economic aspects and clients’ requirements. All these points of view must be considered in the decision-making process so that the selected machine is capable of executing the required activity and that the use of an unsuitable machine is eliminated as it would result in a delay and increase in the project costs. Therefore, reclamation always includes extensive earth-moving work activities restoring the required relief of the land being reclaimed. Using the earth-moving machine capacity, the kind of soil in mine dumps, the kind of the work activity performed and the machine design, a SW application has been developed that allows the most suitable machine for the respective work technology to be selected with a view to preparing the land intended for reclamation.

  4. A nonventing cooling system for space environment extravehicular activity, using radiation and regenerable thermal storage

    NASA Technical Reports Server (NTRS)

    Bayes, Stephen A.; Trevino, Luis A.; Dinsmore, Craig E.

    1988-01-01

    This paper outlines the selection, design, and testing of a prototype nonventing regenerable astronaut cooling system for extravehicular activity space suit applications, for mission durations of four hours or greater. The selected system consists of the following key elements: a radiator assembly which serves as the exterior shell of the portable life support subsystem backpack; a layer of phase change thermal storage material, n-hexadecane paraffin, which acts as a regenerable thermal capacitor; a thermoelectric heat pump; and an automatic temperature control system. The capability for regeneration of thermal storage capacity with and without the aid of electric power is provided.

  5. iSDS: a self-configurable software-defined storage system for enterprise

    NASA Astrophysics Data System (ADS)

    Chen, Wen-Shyen Eric; Huang, Chun-Fang; Huang, Ming-Jen

    2018-01-01

    Storage is one of the most important aspects of IT infrastructure for various enterprises. But, enterprises are interested in more than just data storage; they are interested in such things as more reliable data protection, higher performance and reduced resource consumption. Traditional enterprise-grade storage satisfies these requirements at high cost. It is because traditional enterprise-grade storage is usually designed and constructed by customised field-programmable gate array to achieve high-end functionality. However, in this ever-changing environment, enterprises request storage with more flexible deployment and at lower cost. Moreover, the rise of new application fields, such as social media, big data, video streaming service etc., makes operational tasks for administrators more complex. In this article, a new storage system called intelligent software-defined storage (iSDS), based on software-defined storage, is described. More specifically, this approach advocates using software to replace features provided by traditional customised chips. To alleviate the management burden, it also advocates applying machine learning to automatically configure storage to meet dynamic requirements of workloads running on storage. This article focuses on the analysis feature of iSDS cluster by detailing its architecture and design.

  6. Real-time piloted simulation of fully automatic guidance and control for rotorcraft nap-of-the-earth (NOE) flight following planned profiles

    NASA Technical Reports Server (NTRS)

    Clement, Warren F.; Gorder, Pater J.; Jewell, Wayne F.; Coppenbarger, Richard

    1990-01-01

    Developing a single-pilot all-weather NOE capability requires fully automatic NOE navigation and flight control. Innovative guidance and control concepts are being investigated to (1) organize the onboard computer-based storage and real-time updating of NOE terrain profiles and obstacles; (2) define a class of automatic anticipative pursuit guidance algorithms to follow the vertical, lateral, and longitudinal guidance commands; (3) automate a decision-making process for unexpected obstacle avoidance; and (4) provide several rapid response maneuvers. Acquired knowledge from the sensed environment is correlated with the recorded environment which is then used to determine an appropriate evasive maneuver if a nonconformity is observed. This research effort has been evaluated in both fixed-base and moving-base real-time piloted simulations thereby evaluating pilot acceptance of the automated concepts, supervisory override, manual operation, and reengagement of the automatic system.

  7. 43 CFR 423.14 - How will Reclamation post and delineate closed areas at the site of the closure?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... closed areas at the site of the closure? 423.14 Section 423.14 Public Lands: Interior Regulations... RECLAMATION FACILITIES, LANDS, AND WATERBODIES Areas Open and Closed to Public Use § 423.14 How will Reclamation post and delineate closed areas at the site of the closure? Before or at the time of closing all...

  8. Characteristics of labile organic carbon fractions in reclaimed mine soils: Evidence from three reclaimed forests in the Pingshuo opencast coal mine, China.

    PubMed

    Yuan, Ye; Zhao, Zhongqiu; Li, Xuezhen; Wang, Yangyang; Bai, Zhongke

    2018-02-01

    The reclamation of discarded spoils has the potential to stimulate carbon (C) sequestration in reclaimed mine soils (RMSs). Nevertheless, to date the temporal dynamics of labile organic C fractions have not been sufficiently elucidated in RMSs. In this study, soil organic carbon (SOC) and labile organic C fractions, including microbial biomass organic C (MBC), easily oxidizable organic C (EOC) and dissolved organic C (DOC), were determined in Robinia pseudoacacia monoculture forests (reclamation periods of 0, 8, 10, 13, 15, 18 and 30years), Pinus tabuliformis forests (reclamation periods of 0, 10, 19, 23 and 25years) and Ulmus pumila forests (reclamation periods of 0, 18, 20 and 22years) situated on RMSs in the Pingshuo opencast coal mine, China. Changes in labile organic C fractions within the soil profiles (0-100cm) were also identified at the 18- or 19-year plots under the three monoculture forests. Our results showed that, SOC and labile organic C fractions, together with soil microbial quotient (SMQ) and C management index (CMI), increased with time since reclamation, indicating that the quality of RMSs improved over time after initial reclamation under the three forest types. R. pseudoacacia significantly increased the accretion of SOC and EOC in the early stage of reclamation while P. tabuliformis accelerated the accumulation of the MBC fraction. Results for U. pumila indicated that this species had a better ability to store C in RMSs 10years or more after reclamation. SOC and labile organic C fractions both had S-shaped distributions within the soil profiles (0-100cm), with the 0-20cm layer recording the highest values (P<0.05). Labile organic C fractions were closely associated and correlated with soil physicochemical properties; our results also showed that nitrogen played an important role in the development of labile organic C fractions. Overall, reclamation accelerated the accretion of both SOC and labile organic C fractions, results of which varied among the reclaimed forests. Copyright © 2017 Elsevier B.V. All rights reserved.

  9. 76 FR 45617 - Notice of Lodging of the Consent Decree Under the Resource Conservation and Recovery Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ... underground storage tank (UST) facilities; failure to perform annual tests of automatic line leak detectors... detectors for piping on the UST systems. CHEVRON also agrees under the Consent Decree to install dispenser...

  10. Assessing the Sustainable Development of Coastal Reclamation: A Case of Makassar Using GIS Application

    NASA Astrophysics Data System (ADS)

    Yurnita, A.; Trisutomo, S.; Ali, M.

    2017-07-01

    Reclamation has been made in many areas in Indonesia including Makassar, as a response to the present needs of land as the impact of human activity in urban area. This research aims to assess the sustainable development of coastal reclamation and focus on environmental dimension of sustainable urban development. Assessment will be done by reclamation sustainability index (RSI) and analysis by GIS as the tools. RSI was built from previous research that has simplified from many researches and analysis by Structure of Analytic Hierarchy Process (AHP) and expert choice. RSI uses 9 indices from three indicators of environment factor which are coastal resources, building and infrastructure.

  11. Minimal-resource computer program for automatic generation of ocean wave ray or crest diagrams in shoaling waters

    NASA Technical Reports Server (NTRS)

    Poole, L. R.; Lecroy, S. R.; Morris, W. D.

    1977-01-01

    A computer program for studying linear ocean wave refraction is described. The program features random-access modular bathymetry data storage. Three bottom topography approximation techniques are available in the program which provide varying degrees of bathymetry data smoothing. Refraction diagrams are generated automatically and can be displayed graphically in three forms: Ray patterns with specified uniform deepwater ray density, ray patterns with controlled nearshore ray density, or crest patterns constructed by using a cubic polynomial to approximate crest segments between adjacent rays.

  12. Application of semi-active RFID power meter in automatic verification pipeline and intelligent storage system

    NASA Astrophysics Data System (ADS)

    Chen, Xiangqun; Huang, Rui; Shen, Liman; chen, Hao; Xiong, Dezhi; Xiao, Xiangqi; Liu, Mouhai; Xu, Renheng

    2018-03-01

    In this paper, the semi-active RFID watt-hour meter is applied to automatic test lines and intelligent warehouse management, from the transmission system, test system and auxiliary system, monitoring system, realize the scheduling of watt-hour meter, binding, control and data exchange, and other functions, make its more accurate positioning, high efficiency of management, update the data quickly, all the information at a glance. Effectively improve the quality, efficiency and automation of verification, and realize more efficient data management and warehouse management.

  13. Unexpected hydrologic perturbation in an abandoned underground coal mine: Response to surface reclamation?

    USGS Publications Warehouse

    Harper, D.; Olyphant, G.A.; Hartke, E.J.

    1990-01-01

    A reclamation project at the abandoned Blackhawk Mine site near Terre Haute, Indiana, lasted about four months and involved the burial of coarse mine refuse in shallow (less than 9 m) pits excavated into loess and till in an area of about 16 ha. An abandoned flooded underground coal mine underlies the reclamation site at a depth of about 38 m; the total area underlain by the mine is about 10 km2. The potentiometric levels associated with the mine indicate a significant (2.7 m) and prolonged perturbation of the deeper confined groundwater system; 14 months after completing reclamation, the levels began to rise linearly (at an average rate of 0.85 cm/d) for 11 months, then fell exponentially for 25 months, and are now nearly stable. Prominent subsidence features exist near the reclamation site. Subsidence-related fractures were observed in cores from the site, and such fractures may have provided a connection between the shallower and deeper groundwater systems. ?? 1990 Springer-Verlag New York Inc.

  14. A guide to State programs for the reclamation of surface mined areas

    USGS Publications Warehouse

    Imhoff, Edgar A.; Friz, Thomas O.; LaFevers, James R.

    1976-01-01

    During 1975 inquiries of agencies in each State and review of State statutes and related administrative codes revealed that 38 States have established programs requiring the reclamation of surface mined lands. Results of analyses of those programs and ancillary data are presented in : (1) A table (matrix) which has been designed for the notation and elaboration of information pertaining to the mined-area reclamation programs of the 50 States; (2) a primer on surface mining activities and related reclamation practices and problems; and (3) a listing of types of non-Federal governmental controls applicable to reclamation. Interpretations of the status and content of State programs suggest that although a common thread runs through State statutory language, administrative requirements vary from State to State in order to meet different natural, economic, social, and political considerations. A general trend is seen in State programs toward the requiring of an integration of landuse planning and mine planning, with increased local governmental involvement.

  15. NASA Langley Research Center's distributed mass storage system

    NASA Technical Reports Server (NTRS)

    Pao, Juliet Z.; Humes, D. Creig

    1993-01-01

    There is a trend in institutions with high performance computing and data management requirements to explore mass storage systems with peripherals directly attached to a high speed network. The Distributed Mass Storage System (DMSS) Project at NASA LaRC is building such a system and expects to put it into production use by the end of 1993. This paper presents the design of the DMSS, some experiences in its development and use, and a performance analysis of its capabilities. The special features of this system are: (1) workstation class file servers running UniTree software; (2) third party I/O; (3) HIPPI network; (4) HIPPI/IPI3 disk array systems; (5) Storage Technology Corporation (STK) ACS 4400 automatic cartridge system; (6) CRAY Research Incorporated (CRI) CRAY Y-MP and CRAY-2 clients; (7) file server redundancy provision; and (8) a transition mechanism from the existent mass storage system to the DMSS.

  16. Restoring Forests and Associated Ecosystem Services on Appalachian Coal Surface Mines

    NASA Astrophysics Data System (ADS)

    Zipper, Carl E.; Burger, James A.; Skousen, Jeffrey G.; Angel, Patrick N.; Barton, Christopher D.; Davis, Victor; Franklin, Jennifer A.

    2011-05-01

    Surface coal mining in Appalachia has caused extensive replacement of forest with non-forested land cover, much of which is unmanaged and unproductive. Although forested ecosystems are valued by society for both marketable products and ecosystem services, forests have not been restored on most Appalachian mined lands because traditional reclamation practices, encouraged by regulatory policies, created conditions poorly suited for reforestation. Reclamation scientists have studied productive forests growing on older mine sites, established forest vegetation experimentally on recent mines, and identified mine reclamation practices that encourage forest vegetation re-establishment. Based on these findings, they developed a Forestry Reclamation Approach (FRA) that can be employed by coal mining firms to restore forest vegetation. Scientists and mine regulators, working collaboratively, have communicated the FRA to the coal industry and to regulatory enforcement personnel. Today, the FRA is used routinely by many coal mining firms, and thousands of mined hectares have been reclaimed to restore productive mine soils and planted with native forest trees. Reclamation of coal mines using the FRA is expected to restore these lands' capabilities to provide forest-based ecosystem services, such as wood production, atmospheric carbon sequestration, wildlife habitat, watershed protection, and water quality protection to a greater extent than conventional reclamation practices.

  17. Method and apparatus for telemetry adaptive bandwidth compression

    NASA Technical Reports Server (NTRS)

    Graham, Olin L.

    1987-01-01

    Methods and apparatus are provided for automatic and/or manual adaptive bandwidth compression of telemetry. An adaptive sampler samples a video signal from a scanning sensor and generates a sequence of sampled fields. Each field and range rate information from the sensor are hence sequentially transmitted to and stored in a multiple and adaptive field storage means. The field storage means then, in response to an automatic or manual control signal, transfers the stored sampled field signals to a video monitor in a form for sequential or simultaneous display of a desired number of stored signal fields. The sampling ratio of the adaptive sample, the relative proportion of available communication bandwidth allocated respectively to transmitted data and video information, and the number of fields simultaneously displayed are manually or automatically selectively adjustable in functional relationship to each other and detected range rate. In one embodiment, when relatively little or no scene motion is detected, the control signal maximizes sampling ratio and causes simultaneous display of all stored fields, thus maximizing resolution and bandwidth available for data transmission. When increased scene motion is detected, the control signal is adjusted accordingly to cause display of fewer fields. If greater resolution is desired, the control signal is adjusted to increase the sampling ratio.

  18. Impact of direct greenhouse gas emissions on the carbon footprint of water reclamation processes employing nitrification-denitrification.

    PubMed

    Schneider, Andrew G; Townsend-Small, Amy; Rosso, Diego

    2015-02-01

    Water reclamation has the potential to reduce water supply demands from aquifers and more energy-intensive water production methods (e.g., seawater desalination). However, water reclamation via biological nitrification-denitrification is also associated with the direct emission of the greenhouse gases (GHGs) CO₂, N₂O, and CH₄. We quantified these direct emissions from the nitrification-denitrification reactors of a water reclamation plant in Southern California, and measured the (14)C content of the CO₂ to distinguish between short- and long-lived carbon. The total emissions were 1.5 (±0.2) g-fossil CO₂ m(-3) of wastewater treated, 0.5 (±0.1) g-CO₂-eq of CH₄ m(-3), and 1.8 (±0.5) g-CO₂-eq of N₂O m(-3), for a total of 3.9 (±0.5) g-CO₂-eqm(-3). This demonstrated that water reclamation can be a source of GHGs from long lived carbon, and thus a candidate for GHG reduction credit. From the (14)C measurements, we found that between 11.4% and 15.1% of the CO₂ directly emitted was derived from fossil sources, which challenges past assumptions that the direct CO₂ emissions from water reclamation contain only modern carbon. A comparison of our direct emission measurements with estimates of indirect emissions from several water production methods, however, showed that the direct emissions from water reclamation constitute only a small fraction of the plant's total GHG footprint. Copyright © 2014 Elsevier B.V. All rights reserved.

  19. Suspended-sediment transport and storage: A demonstration of acoustic methods in the evaluation of reservoir management strategies for a small water-supply reservoir in western Colorado

    USGS Publications Warehouse

    Williams, Cory A.; Richards, Rodney J.; Collins, Kent L.

    2015-01-01

    The U.S. Bureau of Reclamation (USBR) and local stakeholder groups are evaluating reservoir-management strategies within Paonia Reservoir. This small reservoir fills to capacity each spring and requires approximately half of the snowmelt-runoff volume from its sediment-laden source waters, Muddy Creek. The U.S. Geological Survey is currently conducting high-resolution (15-minute data-recording interval) sediment monitoring to characterize incoming and outgoing sediment flux during reservoir operations at two sites on Muddy Creek. The high-resolution monitoring is being used to establish current rates of reservoir sedimentation, support USBR sediment transport and storage models, and assess the viability of water-storage recovery in Paonia Reservoir. These sites are equipped with in situ, single-frequency, side-looking acoustic Doppler current meters in conjunction with turbidity sensors to monitor sediment flux. This project serves as a demonstration of the capability of using surrogate techniques to predict suspended-sediment concentrations in small streams (less than 20 meters in width and 2 meters in depth). These two sites provide the ability to report near real-time suspended-sediment concentrations through the U.S. Geological Survey National Water Information System (NWIS) web interface and National Real-Time Water Quality websites (NRTWQ) to aid in reservoir operations and assessments.

  20. Moss and peat hydraulic properties are optimized to maximise peatland water use efficiency

    NASA Astrophysics Data System (ADS)

    Kettridge, Nicholas; Tilak, Amey; Devito, Kevin; Petrone, Rich; Mendoza, Carl; Waddington, Mike

    2016-04-01

    Peatland ecosystems are globally important carbon and terrestrial surface water stores that have formed over millennia. These ecosystems have likely optimised their ecohydrological function over the long-term development of their soil hydraulic properties. Through a theoretical ecosystem approach, applying hydrological modelling integrated with known ecological thresholds and concepts, the optimisation of peat hydraulic properties is examined to determine which of the following conditions peatland ecosystems target during this development: i) maximise carbon accumulation, ii) maximise water storage, or iii) balance carbon profit across hydrological disturbances. Saturated hydraulic conductivity (Ks) and empirical van Genuchten water retention parameter α are shown to provide a first order control on simulated water tensions. Across parameter space, peat profiles with hypothetical combinations of Ks and α show a strong binary tendency towards targeting either water or carbon storage. Actual hydraulic properties from five northern peatlands fall at the interface between these goals, balancing the competing demands of carbon accumulation and water storage. We argue that peat hydraulic properties are thus optimized to maximise water use efficiency and that this optimisation occurs over a centennial to millennial timescale as the peatland develops. This provides a new conceptual framework to characterise peat hydraulic properties across climate zones and between a range of different disturbances, and which can be used to provide benchmarks for peatland design and reclamation.

  1. Capacitive system detects and locates fluid leaks

    NASA Technical Reports Server (NTRS)

    1966-01-01

    Electronic monitoring system automatically detects and locates minute leaks in seams of large fluid storage tanks and pipelines covered with thermal insulation. The system uses a capacitive tape-sensing element that is adhesively bonded over seams where fluid leaks are likely to occur.

  2. 30 CFR 780.4 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.4...

  3. 30 CFR 784.4 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.4...

  4. 30 CFR 784.29 - Diversions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.29...

  5. 30 CFR 784.2 - Objectives.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.2...

  6. 30 CFR 780.29 - Diversions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.29 Diversions...

  7. 30 CFR 780.2 - Objectives.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.2 Objectives...

  8. Automated clustering-based workload characterization

    NASA Technical Reports Server (NTRS)

    Pentakalos, Odysseas I.; Menasce, Daniel A.; Yesha, Yelena

    1996-01-01

    The demands placed on the mass storage systems at various federal agencies and national laboratories are continuously increasing in intensity. This forces system managers to constantly monitor the system, evaluate the demand placed on it, and tune it appropriately using either heuristics based on experience or analytic models. Performance models require an accurate workload characterization. This can be a laborious and time consuming process. It became evident from our experience that a tool is necessary to automate the workload characterization process. This paper presents the design and discusses the implementation of a tool for workload characterization of mass storage systems. The main features of the tool discussed here are: (1)Automatic support for peak-period determination. Histograms of system activity are generated and presented to the user for peak-period determination; (2) Automatic clustering analysis. The data collected from the mass storage system logs is clustered using clustering algorithms and tightness measures to limit the number of generated clusters; (3) Reporting of varied file statistics. The tool computes several statistics on file sizes such as average, standard deviation, minimum, maximum, frequency, as well as average transfer time. These statistics are given on a per cluster basis; (4) Portability. The tool can easily be used to characterize the workload in mass storage systems of different vendors. The user needs to specify through a simple log description language how the a specific log should be interpreted. The rest of this paper is organized as follows. Section two presents basic concepts in workload characterization as they apply to mass storage systems. Section three describes clustering algorithms and tightness measures. The following section presents the architecture of the tool. Section five presents some results of workload characterization using the tool.Finally, section six presents some concluding remarks.

  9. Self-closing shielded container for use with radioactive materials

    DOEpatents

    Smith, Jay E.

    1984-01-01

    A container for storage of radioactive material comprising a container body nd a closure member. The closure member being coupled to the container body to enable the closure body to move automatically from a first position (e.g., closed) to a second position (open).

  10. Self-closing shielded container for use with radioactive materials

    DOEpatents

    Smith, J.E.

    A container for storage of radioactive material comprises a container body and a closure member. The closure member is coupled to the container body to enable the closure body to move automatically from a first position (e.g., closed) to a second position (open).

  11. Experimental teaching and training system based on volume holographic storage

    NASA Astrophysics Data System (ADS)

    Jiang, Zhuqing; Wang, Zhe; Sun, Chan; Cui, Yutong; Wan, Yuhong; Zou, Rufei

    2017-08-01

    The experiment of volume holographic storage for teaching and training the practical ability of senior students in Applied Physics is introduced. The students can learn to use advanced optoelectronic devices and the automatic control means via this experiment, and further understand the theoretical knowledge of optical information processing and photonics disciplines that have been studied in some courses. In the experiment, multiplexing holographic recording and readout is based on Bragg selectivity of volume holographic grating, in which Bragg diffraction angle is dependent on grating-recording angel. By using different interference angle between reference and object beams, the holograms can be recorded into photorefractive crystal, and then the object images can be read out from these holograms via angular addressing by using the original reference beam. In this system, the experimental data acquisition and the control of the optoelectronic devices, such as the shutter on-off, image loaded in SLM and image acquisition of a CCD sensor, are automatically realized by using LabVIEW programming.

  12. Notes on a storage manager for the Clouds kernel

    NASA Technical Reports Server (NTRS)

    Pitts, David V.; Spafford, Eugene H.

    1986-01-01

    The Clouds project is research directed towards producing a reliable distributed computing system. The initial goal is to produce a kernel which provides a reliable environment with which a distributed operating system can be built. The Clouds kernal consists of a set of replicated subkernels, each of which runs on a machine in the Clouds system. Each subkernel is responsible for the management of resources on its machine; the subkernal components communicate to provide the cooperation necessary to meld the various machines into one kernel. The implementation of a kernel-level storage manager that supports reliability is documented. The storage manager is a part of each subkernel and maintains the secondary storage residing at each machine in the distributed system. In addition to providing the usual data transfer services, the storage manager ensures that data being stored survives machine and system crashes, and that the secondary storage of a failed machine is recovered (made consistent) automatically when the machine is restarted. Since the storage manager is part of the Clouds kernel, efficiency of operation is also a concern.

  13. Selecting Proper Plant Species for Mine Reclamation Using Fuzzy AHP Approach (Case Study: Chadormaloo Iron Mine of Iran)

    NASA Astrophysics Data System (ADS)

    Ebrahimabadi, Arash

    2016-12-01

    This paper describes an effective approach to select suitable plant species for reclamation of mined lands in Chadormaloo iron mine which is located in central part of Iran, near the city of Bafgh in Yazd province. After mine's total reserves are excavated, the mine requires to be permanently closed and reclaimed. Mine reclamation and post-mining land-use are the main issues in the phase of mine closure. In general, among various scenarios for mine reclamation process, i.e. planting, agriculture, forestry, residency, tourist attraction, etc., planting is the oldest and commonly-used technology for the reclamation of lands damaged by mining activities. Planting and vegetation play a major role in restoring productivity, ecosystem stability and biological diversity to degraded areas, therefore the main goal of this research work is to choose proper and suitable plants compatible with the conditions of Chadormaloo mined area, providing consistent conditions for future use. To ensure the sustainability of the reclaimed landscape, the most suitable plant species adapted to the mine conditions are selected. Plant species selection is a Multi Criteria Decision Making (MCDM) problem. In this paper, a fuzzy MCDM technique, namely Fuzzy Analytic Hierarchy Process (FAHP) is developed to assist chadormaloo iron mine managers and designers in the process of plant type selection for reclamation of the mine under fuzzy environment where the vagueness and uncertainty are taken into account with linguistic variables parameterized by triangular fuzzy numbers. The results achieved from using FAHP approach demonstrate that the most proper plant species are ranked as Artemisia sieberi, Salsola yazdiana, Halophytes types, and Zygophyllum, respectively for reclamation of Chadormaloo iron mine.

  14. Design description of the Tangaye Village photovoltaic power system

    NASA Astrophysics Data System (ADS)

    Martz, J. E.; Ratajczak, A. F.

    1982-06-01

    The engineering design of a stand alone photovoltaic (PV) powered grain mill and water pump for the village of Tangaye, Upper Volta is described. The socioeconomic effects of reducing the time required by women in rural areas for drawing water and grinding grain were studied. The suitability of photovoltaic technology for use in rural areas by people of limited technical training was demonstrated. The PV system consists of a 1.8-kW (peak) solar cell array, 540 ampere hours of battery storage, instrumentation, automatic controls, and a data collection and storage system. The PV system is situated near an improved village well and supplies d.c. power to a grain mill and a water pump. The array is located in a fenced area and the mill, battery, instruments, controls, and data system are in a mill building. A water storage tank is located near the well. The system employs automatic controls which provide battery charge regulation and system over and under voltage protection. This report includes descriptions of the engineering design of the system and of the load that it serves; a discussion of PV array and battery sizing methodology; descriptions of the mechanical and electrical designs including the array, battery, controls, and instrumentation; and a discussion of the safety features. The system became operational on March 1, 1979.

  15. Design description of the Tangaye Village photovoltaic power system

    NASA Technical Reports Server (NTRS)

    Martz, J. E.; Ratajczak, A. F.

    1982-01-01

    The engineering design of a stand alone photovoltaic (PV) powered grain mill and water pump for the village of Tangaye, Upper Volta is described. The socioeconomic effects of reducing the time required by women in rural areas for drawing water and grinding grain were studied. The suitability of photovoltaic technology for use in rural areas by people of limited technical training was demonstrated. The PV system consists of a 1.8-kW (peak) solar cell array, 540 ampere hours of battery storage, instrumentation, automatic controls, and a data collection and storage system. The PV system is situated near an improved village well and supplies d.c. power to a grain mill and a water pump. The array is located in a fenced area and the mill, battery, instruments, controls, and data system are in a mill building. A water storage tank is located near the well. The system employs automatic controls which provide battery charge regulation and system over and under voltage protection. This report includes descriptions of the engineering design of the system and of the load that it serves; a discussion of PV array and battery sizing methodology; descriptions of the mechanical and electrical designs including the array, battery, controls, and instrumentation; and a discussion of the safety features. The system became operational on March 1, 1979.

  16. The use of biochar substrates for soil reclamation - results of experiments in Northeastern Germany

    NASA Astrophysics Data System (ADS)

    Lukas, Stefan; Haubold-Rosar, Michael

    2017-04-01

    After the model of the very fertile "Terra preta do Indio" in Amazonia, the joint project "LaTerra" has been taken up a new technology for the production of organic substrates using biochar as admixture to the composting and fermentation of biomass to test its application for soil improvement, reclamation and remediation purposes. Processing organic materials or residues and the creation of high quality organic soil improving materials will close material cycles and contribute to the value added on a regional scale. This should be an essential part of a sustainable material flow management. The presentation will focus on the application of biochar substrates for the reclamation of sandy soils in Northeastern Germany. Lignite mining activities leave raw soils without humus on dumps and tips. The rapid formation and maintenance of a balanced humus and nutrient budget is of great importance. Field, lysimeter and pot experiments were part of the research program in order to find out the impact of biochar substrate application on soil functions and plant growth and to derive quality criteria and recommendations for practice. The results of the experiments show that application of biochar substrates (BCS) improved soil properties like nutrient supply, organic carbon content, water storage and cation exchange capacity. However, crop yields did not increase in the year of BCS application on the test sites or even decreased on the dumped soil with rising amounts of BCS. This is a consequence of nitrogen immobilization and sorption in the soils treated with BCS. Therefore, BCS applications should be combined with mineral fertilization of nitrogen and BCS production should be modified aiming to improve contents and release of plant available nitrogen. In the third year after BCS application variants treated with 60 t BCS ha-1 (15 Vol.-% biochar) showed highest yields, exceeding the variants with mineral fertilization. On the dumped soil, in the fourth and fifth year after application all variants exceeded yields of mineral fertilization by 5 to 15 % with maximum in variants treated with 90 t BCS (15 Vol.-% biochar) ha-1.

  17. National Metal Casting Research Institute final report. Volume 1, Sand reclamation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vondra, L.F.; Burningham, J.S.

    1995-08-01

    A mobile thermal foundry sand reclamation unit was designed and constructed. This unit consisted of thermal and mechanical sand reclamation equipment installed on the bed of a 50 foot low-boy trailer. It was transported to a number of Midwest foundries for on-site demonstration of the sand reclamation process. This allowed participating foundries to have their own refuse sand (10-100 tons) processed and then reused in production for evaluation. The purpose for building the unit was to demonstrate to foundries through ``hands on`` experience that refuse sands can be reclaimed and successfully reused particularly in regard to product quality. Most ofmore » the participating foundries indicated a high level of satisfaction with the reclaimed sand. Laboratory testing of samples of the used sand, before and after processing by the demonstration unit, verified the usability of the reclaimed sand. One of the foundries participating was a brass foundry, the sand from this foundry contained lead and is classified as a hazardous material. After reclamation the sand was no longer hazardous and could also be reused in the foundry.« less

  18. Ohio's Abandoned Mine Lands Reclamation Program: a Study of Data Collection and Evaluation Techniques

    NASA Technical Reports Server (NTRS)

    Sperry, S. L.

    1982-01-01

    The planning process for a statewide reclamation plan of Ohio abandoned minelands in response to the Federal Surface Mining Control and Reclamation Act of 1977 included: (1) the development of a screening and ranking methodology; (2) the establishment of a statewide review of major watersheds affected by mining; (3) the development of an immediate action process; and (4) a prototypical study of a priority watershed demonstrating the data collection, analysis, display and evaluation to be used for the remaining state watersheds. Historical methods for satisfying map information analysis and evaluation, as well as current methodologies being used were discussed. Various computer mapping and analysis programs were examined for their usability in evaluating the priority reclamation sites. Hand methods were chosen over automated procedures; intuitive evaluation was the primary reason.

  19. Solar hot water system installed at Days Inn Motel, Jacksonville, Florida

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar system was designed to provide 65 percent of the hot water demand. Water in the liquid flat plate collector (900 square feet) system automatically drains into the 1000 gallon lined and vented steel storage tank when the pump is not running. Heat is transferred from storage to Domestic Hot Water (DHW) tanks through a tube and shell heat exchanger. A circulating pump between the DHW tanks and heat exchanger enables solar heated water to help make up DHW standby losses. All pumps are controlled by differential temperature.

  20. Solar Water-Heater Design Package

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Information on a solar domestic-hot water heater is contained in 146 page design package. System consists of solar collector, storage tanks, automatic control circuitry and auxiliary heater. Data-acquisition equipment at sites monitors day-by-day performance. Includes performance specifications, schematics, solar-collector drawings and drawings of control parts.

  1. 46 CFR 112.30-10 - Restoration of normal source potential.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Section 112.30-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-10 Restoration of normal source potential. When the potential...

  2. 46 CFR 112.30-3 - Normal source for emergency loads.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....30-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-3 Normal source for emergency loads. (a) The normal source...

  3. 46 CFR 112.30-5 - Transfer of emergency loads.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-5 Transfer of emergency loads. If there is a reduction of potential of the...

  4. 46 CFR 112.30-3 - Normal source for emergency loads.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....30-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-3 Normal source for emergency loads. (a) The normal source...

  5. 46 CFR 112.30-3 - Normal source for emergency loads.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....30-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-3 Normal source for emergency loads. (a) The normal source...

  6. 46 CFR 112.30-5 - Transfer of emergency loads.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-5 Transfer of emergency loads. If there is a reduction of potential of the...

  7. 46 CFR 112.30-10 - Restoration of normal source potential.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 112.30-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-10 Restoration of normal source potential. When the potential...

  8. 46 CFR 112.30-10 - Restoration of normal source potential.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 112.30-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-10 Restoration of normal source potential. When the potential...

  9. 46 CFR 112.30-10 - Restoration of normal source potential.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 112.30-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-10 Restoration of normal source potential. When the potential...

  10. 46 CFR 112.30-5 - Transfer of emergency loads.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-5 Transfer of emergency loads. If there is a reduction of potential of the...

  11. 46 CFR 112.30-5 - Transfer of emergency loads.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-5 Transfer of emergency loads. If there is a reduction of potential of the...

  12. 46 CFR 112.30-3 - Normal source for emergency loads.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....30-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-3 Normal source for emergency loads. (a) The normal source...

  13. 46 CFR 112.30-3 - Normal source for emergency loads.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....30-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-3 Normal source for emergency loads. (a) The normal source...

  14. 46 CFR 112.30-10 - Restoration of normal source potential.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 112.30-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-10 Restoration of normal source potential. When the potential...

  15. 46 CFR 112.30-5 - Transfer of emergency loads.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having an Automatically Connected Storage Battery as the Sole Emergency Power Source § 112.30-5 Transfer of emergency loads. If there is a reduction of potential of the...

  16. Indexing Theory and Retrieval Effectiveness.

    ERIC Educational Resources Information Center

    Robertson, Stephen E.

    1978-01-01

    Describes recent attempts to make explicit connections between the indexing process and the use of the index or information retrieval system, particularly the utility-theoretic and automatic indexing models of William Cooper and Stephen Harter. Theory and performance, information storage and retrieval, search stage feedback, and indexing are also…

  17. Recording emergency situations occurring in thermal power plant transformer station automatic control systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Senyagin, Yu.V.; Sop'yanik, V.Kh.; Oreshkin, Yu.A.

    1982-11-01

    Increasing the operational reliability of power generating equipment is linked to the storage and systematization of objective information pertaining to the causes and progress of emergencies occurring in the equipment. Current methods for receiving such information at thermal power plants are discussed.

  18. PLATO--AN AUTOMATED TEACHING DEVICE.

    ERIC Educational Resources Information Center

    BITZER, D.; AND OTHERS

    PLATO (PROGRAMED LOGIC FOR AUTOMATIC TEACHING OPERATION) IS A DEVICE FOR TEACHING A NUMBER OF STUDENTS INDIVIDUALLY BY MEANS OF A SINGLE, CENTRAL PURPOSE, DIGITAL COMPUTER. THE GENERAL ORGANIZATION OF EQUIPMENT CONSISTS OF A KEYSET FOR STUDENT RESPONSES, THE COMPUTER, STORAGE DEVICE (ELECTRIC BLACKBOARD), SLIDE SELECTOR (ELECTRICAL BOOK), AND TV…

  19. Motivation and Design of the Sirocco Storage System Version 1.0.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Curry, Matthew Leon; Ward, H. Lee; Danielson, Geoffrey Charles

    Sirocco is a massively parallel, high performance storage system for the exascale era. It emphasizes client-to-client coordination, low server-side coupling, and free data movement to improve resilience and performance. Its architecture is inspired by peer-to-peer and victim- cache architectures. By leveraging these ideas, Sirocco natively supports several media types, including RAM, flash, disk, and archival storage, with automatic migration between levels. Sirocco also includes storage interfaces and support that are more advanced than typical block storage. Sirocco enables clients to efficiently use key-value storage or block-based storage with the same interface. It also provides several levels of transactional data updatesmore » within a single storage command, including full ACID-compliant updates. This transaction support extends to updating several objects within a single transaction. Further support is provided for con- currency control, enabling greater performance for workloads while providing safe concurrent modification. By pioneering these and other technologies and techniques in the storage system, Sirocco is poised to fulfill a need for a massively scalable, write-optimized storage system for exascale systems. This is version 1.0 of a document reflecting the current and planned state of Sirocco. Further versions of this document will be accessible at http://www.cs.sandia.gov/Scalable_IO/ sirocco .« less

  20. Vehicle-to-Grid Automatic Load Sharing with Driver Preference in Micro-Grids

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Yubo; Nazaripouya, Hamidreza; Chu, Chi-Cheng

    Integration of Electrical Vehicles (EVs) with power grid not only brings new challenges for load management, but also opportunities for distributed storage and generation. This paper comprehensively models and analyzes distributed Vehicle-to-Grid (V2G) for automatic load sharing with driver preference. In a micro-grid with limited communications, V2G EVs need to decide load sharing based on their own power and voltage profile. A droop based controller taking into account driver preference is proposed in this paper to address the distributed control of EVs. Simulations are designed for three fundamental V2G automatic load sharing scenarios that include all system dynamics of suchmore » applications. Simulation results demonstrate that active power sharing is achieved proportionally among V2G EVs with consideration of driver preference. In additional, the results also verify the system stability and reactive power sharing analysis in system modelling, which sheds light on large scale V2G automatic load sharing in more complicated cases.« less

  1. Chemometric strategy for automatic chromatographic peak detection and background drift correction in chromatographic data.

    PubMed

    Yu, Yong-Jie; Xia, Qiao-Ling; Wang, Sheng; Wang, Bing; Xie, Fu-Wei; Zhang, Xiao-Bing; Ma, Yun-Ming; Wu, Hai-Long

    2014-09-12

    Peak detection and background drift correction (BDC) are the key stages in using chemometric methods to analyze chromatographic fingerprints of complex samples. This study developed a novel chemometric strategy for simultaneous automatic chromatographic peak detection and BDC. A robust statistical method was used for intelligent estimation of instrumental noise level coupled with first-order derivative of chromatographic signal to automatically extract chromatographic peaks in the data. A local curve-fitting strategy was then employed for BDC. Simulated and real liquid chromatographic data were designed with various kinds of background drift and degree of overlapped chromatographic peaks to verify the performance of the proposed strategy. The underlying chromatographic peaks can be automatically detected and reasonably integrated by this strategy. Meanwhile, chromatograms with BDC can be precisely obtained. The proposed method was used to analyze a complex gas chromatography dataset that monitored quality changes in plant extracts during storage procedure. Copyright © 2014 Elsevier B.V. All rights reserved.

  2. 36 CFR 9.11 - Reclamation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINERALS MANAGEMENT Mining and Mining Claims § 9.11 Reclamation requirements. (a) As contemporaneously as... reasonable flow of subsurface waters, the return of the area to a condition which does not jeopardize visitor...

  3. Energy Corner: Heat Reclamation Rescues Wasted Heat.

    ERIC Educational Resources Information Center

    Daugherty, Thomas

    1982-01-01

    Heat reclamation systems added to pre-existing central heating systems provide maximum savings at minimum cost. The benefits of a particular appliance marketed under the brand name "Energizer" are discussed. (Author/MLF)

  4. Report on Information Retrieval and Library Automation Studies.

    ERIC Educational Resources Information Center

    Alberta Univ., Edmonton. Dept. of Computing Science.

    Short abstracts of works in progress or completed in the Department of Computing Science at the University of Alberta are presented under five major headings. The five categories are: Storage and search techniques for document data bases, Automatic classification, Study of indexing and classification languages through computer manipulation of data…

  5. 40 CFR 60.112a - Standard for volatile organic compounds (VOC).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... space vents is to provide a projection below the liquid surface. Each opening in the roof except for... for automatic bleeder vents and the rim space vents is to provide a projection below the liquid... for Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification...

  6. 40 CFR 60.112a - Standard for volatile organic compounds (VOC).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... space vents is to provide a projection below the liquid surface. Each opening in the roof except for... for automatic bleeder vents and the rim space vents is to provide a projection below the liquid... for Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification...

  7. 40 CFR 60.112a - Standard for volatile organic compounds (VOC).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... space vents is to provide a projection below the liquid surface. Each opening in the roof except for... for automatic bleeder vents and the rim space vents is to provide a projection below the liquid... for Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification...

  8. 40 CFR 60.112a - Standard for volatile organic compounds (VOC).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... space vents is to provide a projection below the liquid surface. Each opening in the roof except for... for automatic bleeder vents and the rim space vents is to provide a projection below the liquid... for Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification...

  9. 40 CFR 60.112a - Standard for volatile organic compounds (VOC).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... space vents is to provide a projection below the liquid surface. Each opening in the roof except for... for automatic bleeder vents and the rim space vents is to provide a projection below the liquid... for Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification...

  10. 36 CFR 1234.10 - What are the facility requirements for all records storage facilities?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the HVAC systems, fire alarm and fire protection systems. Manual switching between sources of service... elements are protected by a properly installed, properly maintained wet-pipe automatic sprinkler system, as... must provide documentation that the facility has a fire suppression system specifically designed to...

  11. Self-closing shielded container for use with radioactive materials

    DOEpatents

    Smith, J.E.

    1984-10-16

    A container is described for storage of radioactive material comprising a container body and a closure member. The closure member being coupled to the container body to enable the closure body to move automatically from a first position (e.g., closed) to a second position (open). 1 fig.

  12. Full depth reclamation : workshop materials.

    DOT National Transportation Integrated Search

    2011-01-01

    Rehabilitating an old pavement by pulverizing and stabilizing the existing pavement is a process referred to as Full Depth Reclamation (FDR). This process shows great potential as an economical rehabilitation alternative that provides deep structural...

  13. 30 CFR 914.20 - Approval of Indiana abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., 1982. Copies of the approved plan are available at: (a) Indiana Department of Natural Resources... Reclamation and Enforcement, Indianapolis Field Office, Minton-Capehart Federal Building, Room 301, 575 North...

  14. 77 FR 46121 - Notice of Proposed Information Collection; General Provisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-02

    ... jurisdiction of surface coal mining and reclamation operations, petitions for rulemaking, and citizen suits filed under the Surface Mining Control and Reclamation Act of 1977. Bureau Form Number: None. Frequency...

  15. Distributed Coordination of Energy Storage with Distributed Generators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yang, Tao; Wu, Di; Stoorvogel, Antonie A.

    2016-07-18

    With a growing emphasis on energy efficiency and system flexibility, a great effort has been made recently in developing distributed energy resources (DER), including distributed generators and energy storage systems. This paper first formulates an optimal coordination problem considering constraints at both system and device levels, including power balance constraint, generator output limits, storage energy and power capacity and charging/discharging efficiencies. An algorithm is then proposed to dynamically and automatically coordinate DERs in a distributed manner. With the proposed algorithm, the agent at each DER only maintains a local incremental cost and updates it through information exchange with a fewmore » neighbors, without relying on any central decision maker. Simulation results are used to illustrate and validate the proposed algorithm.« less

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bowen, Benjamin; Ruebel, Oliver; Fischer, Curt Fischer R.

    BASTet is an advanced software library written in Python. BASTet serves as the analysis and storage library for the OpenMSI project. BASTet is an integrate framework for: i) storage of spectral imaging data, ii) storage of derived analysis data, iii) provenance of analyses, iv) integration and execution of analyses via complex workflows. BASTet implements the API for the HDF5 storage format used by OpenMSI. Analyses that are developed using BASTet benefit from direct integration with storage format, automatic tracking of provenance, and direct integration with command-line and workflow execution tools. BASTet also defines interfaces to enable developers to directly integratemore » their analysis with OpenMSI's web-based viewing infrastruture without having to know OpenMSI. BASTet also provides numerous helper classes and tools to assist with the conversion of data files, ease parallel implementation of analysis algorithms, ease interaction with web-based functions, description methods for data reduction. BASTet also includes detailed developer documentation, user tutorials, iPython notebooks, and other supporting documents.« less

  17. A Fuzzy Control System for Reducing Urban Runoff by a Stormwater Storage Tank

    NASA Astrophysics Data System (ADS)

    Zhang, P.; Cai, Y.; Wang, J.

    2017-12-01

    Stormwater storage tank (SST) is a popular low impact development technology for reducing stormwater runoff in the construction of sponge city. Most researches on SST were mainly the design, pollutants removal effect, and operation assessment. While there were few researches on the automatic control of SST for reducing peak flow. In this paper, fuzzy control was introduced into the peak control of SST to improve the efficiency of reducing stormawter runoff. Firstly, the design of SST was investigated. A catchment area and return period were assumed, a SST model was manufactured, and then the storage capacity of the SST was verified. Secondly, the control parameters of the SST based on reducing stormwater runoff was analyzed, and a schematic diagram of real-time control (RTC) system based on peak control SST was established. Finally, fuzzy control system of a double input (flow and water level) and double output (inlet and outlet valve) was designed. The results showed that 1) under the different return periods (one year, three years, five years), the SST had the effect of delayed peak control and storage by increasing the detention time, 2) rainfall, pipeline flow, the influent time and the water level in the SST could be used as RTC parameters, and 3) the response curves of flow velocity and water level fluctuated very little and reached equilibrium in a short time. The combination of online monitoring and fuzzy control was feasible to control the SST automatically. This paper provides a theoretical reference for reducing stormwater runoff and improving the operation efficiency of SST.

  18. Functional and environmental assessment of the urboecosystems designed in the biologically reclamated landfill with industrial wastes (in Ryazan city)

    NASA Astrophysics Data System (ADS)

    Karyakin, Alexey; Vasenev, Ivan; Karyakina, Svetlana

    2015-04-01

    Regional environmental bodies' ability to understand, model and predict their soil cover environmental functions are especially important in case of landfill reclamation. The special attention has to be done to landfills with industrial wastes created earlier in frame of big city - comparatively closed to their residential areas. Dominated in Ryazan region sandy loam gray forest soils with not so high soil organic matter content and soil exchange capacity determine additional problems with landfill biological reclamation and continuous sustainable vegetation cover development. The modern environmental monitoring system has been developed in the big landfill with tanning industrial wastes from the biggest in Europe tannery to develop recommendation on the environmentally friendly reclamation technologies adapted to concrete landscape conditions and functional features of 2 m fresh soil-ground coating the landfill surface. More detailed monitoring system has to be developed to assess the regulatory environmental functions of the regenerated soil cover to minimize the reclamated landfill' negative impacts on the urban ecosystem air, surface and ground water quality. Obtained result will be useful for similar landfills with tanning industrial wastes environmental impact assessment and smart design.

  19. Geomorphic reclmation of a coal refuse pile

    NASA Astrophysics Data System (ADS)

    Hopkinson, L. C.; Quaranta, J.

    2017-12-01

    Geomorphic reclamation is a technique that may offer opportunities to improve mine reclamation in Central Appalachia. The design approach is based on constructing a steady-state, mature landform condition and takes into account the long-term climatic conditions, soil types, terrain grade, and vegetation. Geomorphic reclamation has been applied successfully in semi-arid regions but has not yet been applied in Central Appalachia. This work describes a demonstration study where geomorphic landforming techniques are being applied to a coarse coal refuse pile in southern West Virginia, USA. The reclamation design includes four geomorphic watersheds that radially drain runoff from the pile. Each watershed has one central draining channel and incorporates compound slope profiles similarly to naturally eroded slopes. Planar slopes were also included to maintain the impacted area. The intent is to alter the hydrology to decrease water quality treatment costs. The excavation cut and fill volumes are comparable to those of more conventional refuse pile reclamation designs. If proven successful then this technique can be part of a cost-effective solution to improve water quality at active and future refuse facilities, abandoned mine lands, bond forfeiture sites, landfills, and major earthmoving activities within the region.

  20. Trees for Reclamation Symposium Proceedings

    Treesearch

    Northeastern Forest Experiment Station

    1980-01-01

    A collection of 30 papers presented at the symposium on trees for reclamation in the Eastern United States held October 27-29, 1980, Lexington, Kentucky, and sponsored by the USDA Forest Service and Interstate Mining Compact Commission.

  1. 30 CFR 904.25 - Approval of Arkansas abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...; Management accounting; and Abandoned mine land problem description. September 22, 1999 January 14, 2000... management and disposition of land and water; Reclamation on private land; Rights of entry; Public...

  2. Field and laboratory investigations for full depth reclamation projects.

    DOT National Transportation Integrated Search

    2011-03-01

    Full-depth reclamation (FDR) offers a timely, cost-effective solution to restore a pavements condition. : However, FDR represents only one technique in the engineers toolkit available for addressing deteriorating : pavement conditions. The purp...

  3. 30 CFR 884.13 - Content of proposed State reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... reclamation program, the Rural Abandoned Mine Program administered by the Soil Conservation Service, the... wildlife and their habitat. [47 FR 28600, June 30, 1982, as amended at 73 FR 67642, Nov. 14, 2008] ...

  4. 30 CFR 901.20 - Approval of Alabama abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., 649 Monroe Street, Montgomery, AL 36131. (b) Office of Surface Mining Reclamation and Enforcement, Birmingham Field Office, Barber Business Park, 135 Gemini Circle, Homewood, AL 35209. [64 FR 20166, Apr. 26...

  5. 30 CFR 901.20 - Approval of Alabama abandoned mine land reclamation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., 649 Monroe Street, Montgomery, AL 36131. (b) Office of Surface Mining Reclamation and Enforcement, Birmingham Field Office, Barber Business Park, 135 Gemini Circle, Homewood, AL 35209. [64 FR 20166, Apr. 26...

  6. 30 CFR 901.20 - Approval of Alabama abandoned mine land reclamation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., 649 Monroe Street, Montgomery, AL 36131. (b) Office of Surface Mining Reclamation and Enforcement, Birmingham Field Office, Barber Business Park, 135 Gemini Circle, Homewood, AL 35209. [64 FR 20166, Apr. 26...

  7. 30 CFR 901.20 - Approval of Alabama abandoned mine land reclamation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., 649 Monroe Street, Montgomery, AL 36131. (b) Office of Surface Mining Reclamation and Enforcement, Birmingham Field Office, Barber Business Park, 135 Gemini Circle, Homewood, AL 35209. [64 FR 20166, Apr. 26...

  8. 30 CFR 901.20 - Approval of Alabama abandoned mine land reclamation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., 649 Monroe Street, Montgomery, AL 36131. (b) Office of Surface Mining Reclamation and Enforcement, Birmingham Field Office, Barber Business Park, 135 Gemini Circle, Homewood, AL 35209. [64 FR 20166, Apr. 26...

  9. The amino acid's backup bone - storage solutions for proteomics facilities.

    PubMed

    Meckel, Hagen; Stephan, Christian; Bunse, Christian; Krafzik, Michael; Reher, Christopher; Kohl, Michael; Meyer, Helmut Erich; Eisenacher, Martin

    2014-01-01

    Proteomics methods, especially high-throughput mass spectrometry analysis have been continually developed and improved over the years. The analysis of complex biological samples produces large volumes of raw data. Data storage and recovery management pose substantial challenges to biomedical or proteomic facilities regarding backup and archiving concepts as well as hardware requirements. In this article we describe differences between the terms backup and archive with regard to manual and automatic approaches. We also introduce different storage concepts and technologies from transportable media to professional solutions such as redundant array of independent disks (RAID) systems, network attached storages (NAS) and storage area network (SAN). Moreover, we present a software solution, which we developed for the purpose of long-term preservation of large mass spectrometry raw data files on an object storage device (OSD) archiving system. Finally, advantages, disadvantages, and experiences from routine operations of the presented concepts and technologies are evaluated and discussed. This article is part of a Special Issue entitled: Computational Proteomics in the Post-Identification Era. Guest Editors: Martin Eisenacher and Christian Stephan. Copyright © 2013. Published by Elsevier B.V.

  10. Self-learning control system for plug-in hybrid vehicles

    DOEpatents

    DeVault, Robert C [Knoxville, TN

    2010-12-14

    A system is provided to instruct a plug-in hybrid electric vehicle how optimally to use electric propulsion from a rechargeable energy storage device to reach an electric recharging station, while maintaining as high a state of charge (SOC) as desired along the route prior to arriving at the recharging station at a minimum SOC. The system can include the step of calculating a straight-line distance and/or actual distance between an orientation point and the determined instant present location to determine when to initiate optimally a charge depleting phase. The system can limit extended driving on a deeply discharged rechargeable energy storage device and reduce the number of deep discharge cycles for the rechargeable energy storage device, thereby improving the effective lifetime of the rechargeable energy storage device. This "Just-in-Time strategy can be initiated automatically without operator input to accommodate the unsophisticated operator and without needing a navigation system/GPS input.

  11. Series-counterpulse repetitive-pulse inductive storage circuit

    DOEpatents

    Honig, E.M.

    1984-06-05

    A high-power series-counterpulse repetitive-pulse inductive energy storage and transfer circuit includes an opening switch, a main energy storage coil, and a counterpulse capacitor. The local pulse is initiated simultaneously with the initiation of the counterpulse used to turn the opening switch off. There is no delay from command to output pulse. During the load pulse, the counterpulse capacitor is automatically charged with sufficient energy to accomplish the load counterpulse which terminates the load pulse and turns the load switch off. When the main opening switch is reclosed to terminate the load pulse, the counterpulse capacitor discharges through the load, causing a rapid, sharp cutoff of the load pulse as well as recovering any energy remaining in the load inductance. The counterpulse capacitor is recharged to its original condition by the main energy storage coil after the load pulse is over, not before it begins.

  12. Multiple products management system with sensors array in automated storage and retrieval systems

    NASA Astrophysics Data System (ADS)

    Vongbunyong, Supachai; Roengritronnachai, Perawat; Kongsanit, Savanut; Chanok-owat, Chawisa; Polchankajorn, Pongsakorn

    2018-01-01

    Automated Storage and Retrieval Systems (AS/RS) have now been widely used in a number of industries due to its capability to automatically manage the storage of products in effective ways. One of the key features of AS/RS is that each rack is not assigned for a specific product resulting in the benefit of space utilization and logistics related issues. In this research, sensor arrays are equipped at each rack in order to enhance this feature. As a result, various products can be identified and mixed in each rack, so that the space utilization efficiency can be increased. To prove the concept, a prototype system consisting of a Cartesian robot that manages the storage and retrieval of products with 9 variations based on size and color. The concept of Cyber-Physical System and self-awareness of the system are also implemented in this concept prototype.

  13. The impacts of storing solar energy in the home to reduce reliance on the utility

    NASA Astrophysics Data System (ADS)

    Fares, Robert L.; Webber, Michael E.

    2017-01-01

    There has been growing interest in using energy storage to capture solar energy for later use in the home to reduce reliance on the traditional utility. However, few studies have critically assessed the trade-offs associated with storing solar energy rather than sending it to the utility grid, as is typically done today. Here we show that a typical battery system could reduce peak power demand by 8-32% and reduce peak power injections by 5-42%, depending on how it operates. However, storage inefficiencies increase annual energy consumption by 324-591 kWh per household on average. Furthermore, storage operation indirectly increases emissions by 153-303 kg CO2, 0.03-0.20 kg SO2 and 0.04-0.26 kg NOx per Texas household annually. Thus, home energy storage would not automatically reduce emissions or energy consumption unless it directly enables renewable energy.

  14. ERTS-1 data applied to strip mining

    NASA Technical Reports Server (NTRS)

    Anderson, A. T.; Schubert, J.

    1976-01-01

    Two coal basins within the western region of the Potomac River Basin contain the largest strip-mining operations in western Maryland and West Virginia. The disturbed strip-mine areas were delineated along with the surrounding geological and vegetation features by using ERTS-1 data in both analog and digital form. The two digital systems employed were (1) the ERTS analysis system, a point-by-point digital analysis of spectral signatures based on known spectral values and (2) the LARS automatic data processing system. These two systems aided in efforts to determine the extent and state of strip mining in this region. Aircraft data, ground-verification information, and geological field studies also aided in the application of ERTS-1 imagery to perform an integrated analysis that assessed the adverse effects of strip mining. The results indicated that ERTS can both monitor and map the extent of strip mining to determine immediately the acreage affected and to indicate where future reclamation and revegetation may be necessary.

  15. Automated strip-mine and reclamation mapping from ERTS

    NASA Technical Reports Server (NTRS)

    Rogers, R. H. (Principal Investigator); Reed, L. E.; Pettyjohn, W. A.

    1974-01-01

    The author has identified the following significant results. Computer processing techniques were applied to ERTS-1 computer-compatible tape (CCT) data acquired in August 1972 on the Ohio Power Company's coal mining operation in Muskingum County, Ohio. Processing results succeeded in automatically classifying, with an accuracy greater than 90%: (1) stripped earth and major sources of erosion; (2) partially reclaimed areas and minor sources of erosion; (3) water with sedimentation; (4) water without sedimentation; and (5) vegetation. Computer-generated tables listing the area in acres and square kilometers were produced for each target category. Processing results also included geometrically corrected map overlays, one for each target category, drawn on a transparent material by a pen under computer control. Each target category is assigned a distinctive color on the overlay to facilitate interpretation. The overlays, drawn at a scale of 1:250,000 when placed over an AMS map of the same area, immediately provided map locations for each target. These mapping products were generated at a tenth of the cost of conventional mapping techniques.

  16. 10 CFR 765.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... enactment of UMTRCA to perform decontamination, decommissioning, reclamation, and other remedial action... contaminated soil, disposal of process wastes, removal actions, air pollution abatement measures, mill and... subpart C of this part. Decontamination, decommissioning, reclamation, and other remedial action means...

  17. 30 CFR 750.1 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON INDIAN LANDS § 750.1 Scope. This subchapter provides for the regulation of surface coal mining and reclamation operations on Indian lands and constitutes the Federal program for Indian lands. ...

  18. 30 CFR 750.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON INDIAN LANDS § 750.1 Scope. This subchapter provides for the regulation of surface coal mining and reclamation operations on Indian lands and constitutes the Federal program for Indian lands. ...

  19. 30 CFR 750.1 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON INDIAN LANDS § 750.1 Scope. This subchapter provides for the regulation of surface coal mining and reclamation operations on Indian lands and constitutes the Federal program for Indian lands. ...

  20. 30 CFR 750.1 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON INDIAN LANDS § 750.1 Scope. This subchapter provides for the regulation of surface coal mining and reclamation operations on Indian lands and constitutes the Federal program for Indian lands. ...

Top