Sample records for backup power supplies

  1. Emergency and backup power supplies at Department of Energy facilities: Augmented Evaluation Team -- Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report documents the results of the Defense Programs (DP) Augmented Evaluation Team (AET) review of emergency and backup power supplies (i.e., generator, uninterruptible power supply, and battery systems) at DP facilities. The review was conducted in response to concerns expressed by former Secretary of Energy James D. Watkins over the number of incidents where backup power sources failed to provide electrical power during tests or actual demands. The AET conducted a series of on-site reviews for the purpose of understanding the design, operation, maintenance, and safety significance of emergency and backup power (E&BP) supplies. The AET found that themore » quality of programs related to maintenance of backup power systems varies greatly among the sites visited, and often among facilities at the same site. No major safety issues were identified. However, there are areas where the AET believes the reliability of emergency and backup power systems can and should be improved. Recommendations for improving the performance of E&BP systems are provided in this report. The report also discusses progress made by Management and Operating (M&O) contractors to improve the reliability of backup sources used in safety significant applications. One area that requires further attention is the analysis and understanding of the safety implications of backup power equipment. This understanding is needed for proper graded-approach implementation of Department of Energy (DOE) Orders, and to help ensure that equipment important to the safety of DOE workers, the public, and the environment is identified, classified, recognized, and treated as such by designers, users, and maintainers. Another area considered important for improving E&BP system performance is the assignment of overall ownership responsibility and authority for ensuring that E&BP equipment performs adequately and that reliability and availability are maintained at acceptable levels.« less

  2. Fuel Cells for Backup Power in Telecommunications Facilities (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2009-04-01

    Telecommunications providers rely on backup power to maintain a constant power supply, to prevent power outages, and to ensure the operability of cell towers, equipment, and networks. The backup power supply that best meets these objectives is fuel cell technology.

  3. Backup agreements with penalty scheme under supply disruptions

    NASA Astrophysics Data System (ADS)

    Hou, Jing; Zhao, Lindu

    2012-05-01

    This article considers a supply chain for a single product involving one retailer and two independent suppliers, when the main supplier might fail to supply the products, the backup supplier can always supply the products at a higher price. The retailer could use the backup supplier as a regular provider or a stand-by source by reserving some products at the supplier. A backup agreement with penalty scheme is constructed between the retailer and the backup supplier to mitigate the supply disruptions and the demand uncertainty. The expected profit functions and the optimal decisions of the two players are derived through a sequential optimisation process. Then, the sensitivity of two players' expected profits to various input factors is examined through numerical examples. The impacts of the disruption probability and the demand uncertainty on the backup agreement are also investigated, which could provide guideline for how to use each sourcing method.

  4. 47 CFR 12.2 - Backup power.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Backup power. 12.2 Section 12.2 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL REDUNDANCY OF COMMUNICATIONS SYSTEMS § 12.2 Backup power..., must have an emergency backup power source (e.g., batteries, generators, fuel cells) for all assets...

  5. Power supply

    DOEpatents

    Yakymyshyn, Christopher Paul; Hamilton, Pamela Jane; Brubaker, Michael Allen

    2007-12-04

    A modular, low weight impedance dropping power supply with battery backup is disclosed that can be connected to a high voltage AC source and provide electrical power at a lower voltage. The design can be scaled over a wide range of input voltages and over a wide range of output voltages and delivered power.

  6. Fuel Cell Backup Power System for Grid Service and Micro-Grid in Telecommunication Applications: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ma, Zhiwen; Eichman, Joshua D; Kurtz, Jennifer M

    This paper presents the feasibility and economics of using fuel cell backup power systems in telecommunication cell towers to provide grid services (e.g., ancillary services, demand response). The fuel cells are able to provide power for the cell tower during emergency conditions. This study evaluates the strategic integration of clean, efficient, and reliable fuel cell systems with the grid for improved economic benefits. The backup systems have potential as enhanced capability through information exchanges with the power grid to add value as grid services that depend on location and time. The economic analysis has been focused on the potential revenuemore » for distributed telecommunications fuel cell backup units to provide value-added power supply. This paper shows case studies on current fuel cell backup power locations and regional grid service programs. The grid service benefits and system configurations for different operation modes provide opportunities for expanding backup fuel cell applications responsive to grid needs.« less

  7. Hydrogen Fuel Cell Performance as Telecommunications Backup Power in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurtz, Jennifer; Saur, Genevieve; Sprik, Sam

    2015-03-01

    Working in collaboration with the U.S. Department of Energy (DOE) and industry project partners, the National Renewable Energy Laboratory (NREL) acts as the central data repository for the data collected from real-world operation of fuel cell backup power systems. With American Recovery and Reinvestment Act of 2009 (ARRA) co-funding awarded through DOE's Fuel Cell Technologies Office, more than 1,300 fuel cell units were deployed over a three-plus-year period in stationary, material handling equipment, auxiliary power, and backup power applications. This surpassed a Fuel Cell Technologies Office ARRA objective to spur commercialization of an early market technology by installing 1,000 fuelmore » cell units across several different applications, including backup power. By December 2013, 852 backup power units out of 1,330 fuel cell units deployed were providing backup service, mainly for telecommunications towers. For 136 of the fuel cell backup units, project participants provided detailed operational data to the National Fuel Cell Technology Evaluation Center for analysis by NREL's technology validation team. NREL analyzed operational data collected from these government co-funded demonstration projects to characterize key fuel cell backup power performance metrics, including reliability and operation trends, and to highlight the business case for using fuel cells in these early market applications. NREL's analyses include these critical metrics, along with deployment, U.S. grid outage statistics, and infrastructure operation.« less

  8. Production planning and backup sourcing strategy of a buyer-dominant supply chain with random yield and demand

    NASA Astrophysics Data System (ADS)

    Chen, Kebing; Xiao, Tiaojun

    2015-11-01

    This paper studies the backup sourcing strategy of the buyer and the production planning of the supplier in presence of both random yield and random demand. Since the production is susceptible to the randomness of yield beyond the control of the supplier, the buyer may access to a backup sourcing option for the finished items. We analyse the value of backup sourcing for both the decentralised and centralised channels. Backup sourcing strategy of the buyer may lower the supply chain's performance. We show that the order quantity of the buyer does not change the stocking factor of the supplier's input. Meanwhile, compared with the centralised operation, the decentralised operation is more dependent on the backup sourcing to reduce supply shortage of the contracting supplier. From the channel's perspective, an incentive scheme is developed to facilitate the coordination of both the buyer and the contracting supplier, we show that the proposed option contract can allow the supply chain members to share the respective risks involved in the production and selling processes. Finally, we also provide qualitative insights based on numerical examples of the centralised and decentralised solutions.

  9. 47 CFR 12.2 - Backup power.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... exchange carriers, including incumbent local exchange carriers and competitive local exchange carriers..., must have an emergency backup power source (e.g., batteries, generators, fuel cells) for all assets... or local law; (2) Risk to safety of life or health; or (3) Private legal obligation or agreement. (c...

  10. Reliability considerations of a fuel cell backup power system for telecom applications

    NASA Astrophysics Data System (ADS)

    Serincan, Mustafa Fazil

    2016-03-01

    A commercial fuel cell backup power unit is tested in real life operating conditions at a base station of a Turkish telecom operator. The fuel cell system responds to 256 of 260 electric power outages successfully, providing the required power to the base station. Reliability of the fuel cell backup power unit is found to be 98.5% at the system level. On the other hand, a qualitative reliability analysis at the component level is carried out. Implications of the power management algorithm on reliability is discussed. Moreover, integration of the backup power unit to the base station ecosystem is reviewed in the context of reliability. Impact of inverter design on the stability of the output power is outlined. Significant current harmonics are encountered when a generic inverter is used. However, ripples are attenuated significantly when a custom design inverter is used. Further, fault conditions are considered for real world case studies such as running out of hydrogen, a malfunction in the system, or an unprecedented operating scheme. Some design guidelines are suggested for hybridization of the backup power unit for an uninterrupted operation.

  11. Portable power supply options for positive airway pressure devices.

    PubMed

    Riaz, Muhammad; Certal, Victor; Camacho, Macario

    2015-01-01

    Patients with obstructive sleep apnea (OSA) often face the challenge of how to power their positive airway pressure (PAP) devices when alternating current power supplies are not available in remote areas with lack of electricity or frequent power outages. This article elucidates portable power supply options for PAP devices with the aim to increase alternative power source awareness among medical providers. A search of scientific databases (Medline, Scopus, Web of Science, Google Scholar, and the Cochrane Library) was carried out on the topic of alternative portable power supply options for treatment of OSA. Scientific databases listed above yielded only limited results. Most articles were found via Google search. These articles were reviewed for alternative power supply options for OSA patients when alternating current is not available. The power supply options in this article include lead-acid batteries (starter, marine and deep-cycle batteries), lithium ion batteries, solar kits, battery packs, backup power systems, portable generators, and travel-size PAP devices. There are several options to power PAP devices with direct current when alternating current is not available. Knowledgeable primary care physicians especially in rural and remote areas can help OSA patients improve PAP compliance in order to mitigate morbidity and long-term complications of OSA.

  12. Accelerating Acceptance of Fuel Cell Backup Power Systems - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petrecky, James; Ashley, Christopher

    2014-07-21

    Since 2001, Plug Power has installed more than 800 stationary fuel cell systems worldwide. Plug Power’s prime power systems have produced approximately 6.5 million kilowatt hours of electricity and have accumulated more than 2.5 million operating hours. Intermittent, or backup, power products have been deployed with telecommunications carriers and government and utility customers in North and South America, Europe, the United Kingdom, Japan and South Africa. Some of the largest material handling operations in North America are currently using the company’s motive power units in fuel cell-powered forklifts for their warehouses, distribution centers and manufacturing facilities. The low-temperature GenSys fuelmore » cell system provides remote, off-grid and primary power where grid power is unreliable or nonexistent. Built reliable and designed rugged, low- temperature GenSys delivers continuous or backup power through even the most extreme conditions. Coupled with high-efficiency ratings, low-temperature GenSys reduces operating costs making it an economical solution for prime power requirements. Currently, field trials at telecommunication and industrial sites across the globe are proving the advantages of fuel cells—lower maintenance, fuel costs and emissions, as well as longer life—compared with traditional internal combustion engines.« less

  13. 12. Detail of clutch and backup gasoline engine for powering ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Detail of clutch and backup gasoline engine for powering Stoney gates. Clutch mechanism manufactured by Baldridge Machine Company, Detroit, Michigan, ca. 1910. Instrument to the left records volume of flow through headworks. View looking south towards Stoney gates. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  14. Fuel Cell Backup Power Geographical Visualization Map (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2012-12-01

    This NREL Hydrogen and Fuel Cell Technical Highlight describes a time-lapse geographical visualization map of early market use of fuel cells for telecommunications backup power. The map synthesizes data being analyzed by NREL's Technology Validation team for the U.S. Department of Energy (DOE) Fuel Cell Technologies Program with DOE's publicly available annual summaries of electric disturbance events.

  15. Comprehensive Software Simulation on Ground Power Supply for Launch Pads and Processing Facilities at NASA Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Dominguez, Jesus A.; Victor, Elias; Vasquez, Angel L.; Urbina, Alfredo R.

    2017-01-01

    A multi-threaded software application has been developed in-house by the Ground Special Power (GSP) team at NASA Kennedy Space Center (KSC) to separately simulate and fully emulate all units that supply VDC power and battery-based power backup to multiple KSC launch ground support systems for NASA Space Launch Systems (SLS) rocket.

  16. Feasibility analysis of a hydrogen backup power system for Russian telecom market

    NASA Astrophysics Data System (ADS)

    Borzenko, V. I.; Dunikov, D. O.

    2017-11-01

    We performed feasibility analysis of 10 kW hydrogen backup power system (H2BS) consisting of a water electrolyzer, a metal hydride hydrogen storage and a fuel cell. Capital investments in H2BS are mostly determined by the costs of the PEM electrolyzer, the fuel cell and solid state hydrogen storage materials, for single unit or small series manufacture the cost of AB5-type intermetallic compound can reach 50% of total system cost. Today the capital investments in H2BS are 3 times higher than in conventional lead-acid system of the same capacity. Wide distribution of fuel cell hydrogen vehicles, development of hydrogen infrastructure, and mass production of hydrogen power systems will for sure lower capital investments in fuel cell backup power. Operational expenditures for H2BS is only 15% from the expenditures for lead acid systems, and after 4-5 years of exploitation the total cost of ownership will become lower than for batteries.

  17. A Study of Fuel Supplies for Emergency Power Generation at Air Logistics Centers.

    DTIC Science & Technology

    1980-06-01

    D-AD087 088 AIR FORCE INST OF TECH WRIGHT-PATTERSON AFB OH SCHOOL--ETC F/. I"/. STUDY OF FUEL SUPPLIES FOR EMERGENCY POWER GENERATION AT AIR -ETCIU...public release; distribution unlimited 17. DISTRIBUTION STATEMENT (at thme abstract sneered lei Black 20. 1 itoINt~ &P 190-17. FlEDiC C. L N uS "il I...operations required by a wartime scenario may depend upon the use of emergency back-up generators to provide electrical power to critical facilities. After

  18. Development and Testing of an Ultracapacitor Based Uninterruptible Power Supply (UPS) System

    NASA Technical Reports Server (NTRS)

    Eichenberg, Dennis J.

    2010-01-01

    The NASA Glenn Research Center (GRC) initiated the development and testing of an ultracapacitor based uninterruptible power supply (UPS) system as a means to provide backup power for the many critical NASA applications. A UPS system typically utilizes batteries for energy storage. The battery is the most vulnerable part of the UPS system, requiring regular maintenance and replacement. Battery performance is also extremely temperature dependent. Ultracapacitors are ideal for UPS systems where long life, maintenance free operation, and excellent low temperature performance is essential. State of the art symmetric ultracapacitors were used for these tests. The ultracapacitors were interconnected in an innovative configuration to minimize interconnection impedance, and to provide voltage balancing. Ultracapacitors can be charged extremely rapidly and supply high current, which are essential characteristics for an effective UPS system. Charging ultracapacitors is significantly less complex than charging batteries since there is no chemical reaction occurring while charging ultracapacitors. The report concludes that the implementation of symmetric ultracapacitors in a UPS system can provide significant improvements in power system performance and reliability.

  19. Rates for backup service under PURPA when the supplying utility has excess generating capacity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Under PURPA, cogenerators are entitled to receive backup service. It is often said that tariffs for backup service should reflect the low probability that an unscheduled outage will occur during system peak. This memorandum concludes that probabilistic analysis of contribution to coincident peak demand is not relevant under PURPA during periods in which a utility system is experiencing generating capacity surpluses, and that in such situations, backup rates should be designed so that should the customer insist on installing a cogeneration system, that the customer's contribution to fixed costs remains constant. The reason for this is to assure that prospectivemore » cogenerators receive appropriate pricing signals in their assessment of proposed cogeneration projects, and should they decide to install cogeneration facilities requiring backup service, to hold the remaining customers on the system harmless.« less

  20. 77 FR 28797 - Redundancy of Communications Systems: Backup Power Private Land Mobile Radio Services: Selection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Systems: Backup Power Private Land Mobile Radio Services: Selection and Assignment of Frequencies, and... certain rule provisions that are without current legal effect and obsolete. These nonsubstantive revisions... current legal effect and is deleted as obsolete. 2. This Order also deletes a rule providing that UHF...

  1. How to maintain blood supply during computer network breakdown: a manual backup system.

    PubMed

    Zeiler, T; Slonka, J; Bürgi, H R; Kretschmer, V

    2000-12-01

    Electronic data management systems using computer network systems and client/server architecture are increasingly used in laboratories and transfusion services. Severe problems arise if there is no network access to the database server and critical functions are not available. We describe a manual backup system (MBS) developed to maintain the delivery of blood products to patients in a hospital transfusion service in case of a computer network breakdown. All data are kept on a central SQL database connected to peripheral workstations in a local area network (LAN). Request entry from wards is performed via machine-readable request forms containing self-adhesive specimen labels with barcodes for test tubes. Data entry occurs on-line by bidirectional automated systems or off-line manually. One of the workstations in the laboratory contains a second SQL database which is frequently and incrementally updated. This workstation is run as a stand-alone, read-only database if the central SQL database is not available. In case of a network breakdown, the time-graded MBS is launched. Patient data, requesting ward and ordered tests/requests, are photocopied through a template from the request forms on special MBS worksheets serving as laboratory journal for manual processing and result report (a copy is left in the laboratory). As soon as the network is running again the data from the off-line period are entered into the primary SQL server. The MBS was successfully used at several occasions. The documentation of a 90-min breakdown period is presented in detail. Additional work resulted from the copy work and the belated manual data entry after restoration of the system. There was no delay in issue of blood products or result reporting. The backup system described has been proven to be simple, quick and safe to maintain urgent blood supply and distribution of laboratory results in case of unexpected network breakdown.

  2. Power supply conditioning circuit

    NASA Technical Reports Server (NTRS)

    Primas, L. E.; Loveland, R.

    1987-01-01

    A power supply conditioning circuit that can reduce Periodic and Random Deviations (PARD) on the output voltages of dc power supplies to -150 dBV from dc to several KHz with no measurable periodic deviations is described. The PARD for a typical commercial low noise power supply is -74 dBV for frequencies above 20 Hz and is often much worse at frequencies below 20 Hz. The power supply conditioning circuit described here relies on the large differences in the dynamic impedances of a constant current diode and a zener diode to establish a dc voltage with low PARD. Power supplies with low PARD are especially important in circuitry involving ultrastable frequencies for the Deep Space Network.

  3. Smart Power Supply for Battery-Powered Systems

    NASA Technical Reports Server (NTRS)

    Krasowski, Michael J.; Greer, Lawrence; Prokop, Norman F.; Flatico, Joseph M.

    2010-01-01

    A power supply for battery-powered systems has been designed with an embedded controller that is capable of monitoring and maintaining batteries, charging hardware, while maintaining output power. The power supply is primarily designed for rovers and other remote science and engineering vehicles, but it can be used in any battery alone, or battery and charging source applications. The supply can function autonomously, or can be connected to a host processor through a serial communications link. It can be programmed a priori or on the fly to return current and voltage readings to a host. It has two output power busses: a constant 24-V direct current nominal bus, and a programmable bus for output from approximately 24 up to approximately 50 V. The programmable bus voltage level, and its output power limit, can be changed on the fly as well. The power supply also offers options to reduce the programmable bus to 24 V when the set power limit is reached, limiting output power in the case of a system fault detected in the system. The smart power supply is based on an embedded 8051-type single-chip microcontroller. This choice was made in that a credible progression to flight (radiation hard, high reliability) can be assumed as many 8051 processors or gate arrays capable of accepting 8051-type core presently exist and will continue to do so for some time. To solve the problem of centralized control, this innovation moves an embedded microcontroller to the power supply and assigns it the task of overseeing the operation and charging of the power supply assets. This embedded processor is connected to the application central processor via a serial data link such that the central processor can request updates of various parameters within the supply, such as battery current, bus voltage, remaining power in battery estimations, etc. This supply has a direct connection to the battery bus for common (quiescent) power application. Because components from multiple vendors may have

  4. Wave resource variability: Impacts on wave power supply over regional to international scales

    NASA Astrophysics Data System (ADS)

    Smith, Helen; Fairley, Iain; Robertson, Bryson; Abusara, Mohammad; Masters, Ian

    2017-04-01

    The intermittent, irregular and variable nature of the wave energy resource has implications for the supply of wave-generated electricity into the grid. Intermittency of renewable power may lead to frequency and voltage fluctuations in the transmission and distribution networks. A matching supply of electricity must be planned to meet the predicted demand, leading to a need for gas-fired and back-up generating plants to supplement intermittent supplies, and potentially limiting the integration of intermittent power into the grid. Issues relating to resource intermittency and their mitigation through the development of spatially separated sites have been widely researched in the wind industry, but have received little attention to date in the less mature wave industry. This study analyses the wave resource over three different spatial scales to investigate the potential impacts of the temporal and spatial resource variability on the grid supply. The primary focus is the Southwest UK, a region already home to multiple existing and proposed wave energy test sites. Concurrent wave buoy data from six locations, supported by SWAN wave model hindcast data, are analysed to assess the correlation of the resource across the region and the variation in wave power with direction. Power matrices for theoretical nearshore and offshore devices are used to calculate the maximum step change in generated power across the region as the number of deployment sites is increased. The step change analysis is also applied across national and international spatial scales using output from the European Centre for Medium-range Weather Forecasting (ECMWF) ERA-Interim hindcast model. It is found that the deployment of multiple wave energy sites, whether on a regional, national or international scale, results in both a reduction in step changes in power and reduced times of zero generation, leading to an overall smoothing of the wave-generated electrical power. This has implications for the

  5. Comparison of circular orbit and Fourier power series ephemeris representations for backup use by the upper atmosphere research satellite onboard computer

    NASA Technical Reports Server (NTRS)

    Kast, J. R.

    1988-01-01

    The Upper Atmosphere Research Satellite (UARS) is a three-axis stabilized Earth-pointing spacecraft in a low-Earth orbit. The UARS onboard computer (OBC) uses a Fourier Power Series (FPS) ephemeris representation that includes 42 position and 42 velocity coefficients per axis, with position residuals at 10-minute intervals. New coefficients and 32 hours of residuals are uploaded daily. This study evaluated two backup methods that permit the OBC to compute an approximate spacecraft ephemeris in the event that new ephemeris data cannot be uplinked for several days: (1) extending the use of the FPS coefficients previously uplinked, and (2) switching to a simple circular orbit approximation designed and tested (but not implemented) for LANDSAT-D. The FPS method provides greater accuracy during the backup period and does not require additional ground operational procedures for generating and uplinking an additional ephemeris table. The tradeoff is that the high accuracy of the FPS will be degraded slightly by adopting the longer fit period necessary to obtain backup accuracy for an extended period of time. The results for UARS show that extended use of the FPS is superior to the circular orbit approximation for short-term ephemeris backup.

  6. Hold-up power supply for flash memory

    NASA Technical Reports Server (NTRS)

    Ott, William E. (Inventor)

    2004-01-01

    A hold-up power supply for flash memory systems is provided. The hold-up power supply provides the flash memory with the power needed to temporarily operate when a power loss exists. This allows the flash memory system to complete any erasures and writes, and thus allows it to shut down gracefully. The hold-up power supply detects when a power loss on a power supply bus is occurring and supplies the power needed for the flash memory system to temporally operate. The hold-up power supply stores power in at least one capacitor. During normal operation, power from a high voltage supply bus is used to charge the storage capacitors. When a power supply loss is detected, the power supply bus is disconnected from the flash memory system. A hold-up controller controls the power flow from the storage capacitors to the flash memory system. The hold-up controller uses feedback to assure that the proper voltage is provided from the storage capacitors to the flash memory system. This power supplied by the storage capacitors allows the flash memory system to complete any erasures and writes, and thus allows the flash memory system to shut down gracefully.

  7. Characteristics of a lithium-thionyl chloride battery as a memory back-up power source

    NASA Astrophysics Data System (ADS)

    Iwamaru, T.; Uetani, Y.

    An Li/SOCl 2 battery of R6 size (ER6C) has been evaluated as a memory back-up power source for CMOS RAM. The working voltage is 3.6 V and the discharge capacity is 1900 mA h on a 1OK-ohm load. The cell exhibits satisfactory working voltage and discharge capacity over the temperature range -40 °C to 85 °C. The discharge reaction mechanism has been elucidated. Cumulative self discharge during 10 years discharge at 20 μA is estimated to be 3.5%. No serious problems have been observed during abuse tests.

  8. Analysis of the costs of fuel supply for wood-fired electric power plants in rural Liberia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Perlack, R.D.; Barron, W.F.; Samuels, G.

    1985-06-01

    In recent years the quality of rural electric services in Liberia has been declining and the future economic viability of these power stations is a growing concern. Each of the ten operating and each of the planned rural public power stations is designed to operate exclusively on gas oil (diesel fuel). Fuel expenditures by the Liberian Electricity Corporation (LEC) for the rural public stations represent a major and growing burden on the financially hardpressed utility. Liberia has two potentially significant alternatives to oil-fired electric power for its up-country towns: small (1 to 5 MW) hydroelectric facilities, and wood-fired steam ormore » gasifier plants (0.2 to 2 MW). Although small hydroelectric facilities appear viable for several locations, they cannot serve all locations and will require thermal back-up. The economics of supplying wood to a rural electric power plant or rural grid were evaluated under several scenarios involving: (1) different sources of the feedstock, and (2) differences in wood supply requirements for plants based on the use of steam or gasifier technology, and variation in the utilization level for such plants. With a few minor exceptions, wood energy supplies are plentiful throughout Liberia. Liberia has four different potential sources of wood fuel supply: the commercial cutting of retired rubber trees; the harvesting of secondary growth forest just prior to the land returning to temporary cultivation as part of a system of shifting agriculture; adding to the system of shifting agriculture the planting of fast-growing wood species and harvesting these trees when the land again is brought back under cultivation (generally after about five to seven years); and the establishment of commercial short-rotation wood energy plantations. Results indicate that the use of wood to fuel rural power stations is a viable economic option.« less

  9. Shock-activated electrochemical power supplies

    DOEpatents

    Benedick, William B.; Graham, Robert A.; Morosin, Bruno

    1988-01-01

    A shock-activated electrochemical power supply is provided which is initiated extremely rapidly and which has a long shelf life. Electrochemical power supplies of this invention are initiated much faster than conventional thermal batteries. Power supplies of this invention comprise an inactive electrolyte and means for generating a high-pressure shock wave such that the shock wave is propagated through the electrolytes rendering the electrolyte electrochemically active.

  10. Redundancy of Supply in the International Nuclear Fuel Fabrication Market: Are Fabrication Services Assured?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seward, Amy M.; Toomey, Christopher; Ford, Benjamin E.

    2011-11-14

    For several years, Pacific Northwest National Laboratory (PNNL) has been assessing the reliability of nuclear fuel supply in support of the U.S. Department of Energy/National Nuclear Security Administration. Three international low enriched uranium reserves, which are intended back up the existing and well-functioning nuclear fuel market, are currently moving toward implementation. These backup reserves are intended to provide countries credible assurance that of the uninterrupted supply of nuclear fuel to operate their nuclear power reactors in the event that their primary fuel supply is disrupted, whether for political or other reasons. The efficacy of these backup reserves, however, may bemore » constrained without redundant fabrication services. This report presents the findings of a recent PNNL study that simulated outages of varying durations at specific nuclear fuel fabrication plants. The modeling specifically enabled prediction and visualization of the reactors affected and the degree of fuel delivery delay. The results thus provide insight on the extent of vulnerability to nuclear fuel supply disruption at the level of individual fabrication plants, reactors, and countries. The simulation studies demonstrate that, when a reasonable set of qualification criteria are applied, existing fabrication plants are technically qualified to provide backup fabrication services to the majority of the world's power reactors. The report concludes with an assessment of the redundancy of fuel supply in the nuclear fuel market, and a description of potential extra-market mechanisms to enhance the security of fuel supply in cases where it may be warranted. This report is an assessment of the ability of the existing market to respond to supply disruptions that occur for technical reasons. A forthcoming report will address political disruption scenarios.« less

  11. Shock-activated electrochemical power supplies

    DOEpatents

    Benedick, W.B.; Graham, R.A.; Morosin, B.

    1988-11-08

    A shock-activated electrochemical power supply is provided which is initiated extremely rapidly and which has a long shelf life. Electrochemical power supplies of this invention are initiated much faster than conventional thermal batteries. Power supplies of this invention comprise an inactive electrolyte and means for generating a high-pressure shock wave such that the shock wave is propagated through the electrolytes rendering the electrolyte electrochemically active. 2 figs.

  12. 47 CFR 80.859 - Main power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Main power supply. 80.859 Section 80.859... power supply. (a) The main power supply must simultaneously energize the radiotelephone transmitter at... main power supply at the radiotelephone input terminals must not deviate from its rated potential by...

  13. 47 CFR 80.859 - Main power supply.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Main power supply. 80.859 Section 80.859... power supply. (a) The main power supply must simultaneously energize the radiotelephone transmitter at... main power supply at the radiotelephone input terminals must not deviate from its rated potential by...

  14. 47 CFR 80.1015 - Power supply.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Power supply. 80.1015 Section 80.1015... MARITIME SERVICES Radiotelephone Installations Required by the Bridge-to-Bridge Act § 80.1015 Power supply. (a) There must be readily available for use under normal load conditions, a power supply sufficient...

  15. 49 CFR 236.516 - Power supply.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Power supply. 236.516 Section 236.516..., Train Control and Cab Signal Systems Standards § 236.516 Power supply. Automatic cab signal, train stop, or train control device hereafter installed shall operate from a separate or isolated power supply...

  16. 47 CFR 80.1015 - Power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Power supply. 80.1015 Section 80.1015... MARITIME SERVICES Radiotelephone Installations Required by the Bridge-to-Bridge Act § 80.1015 Power supply. (a) There must be readily available for use under normal load conditions, a power supply sufficient...

  17. 49 CFR 236.516 - Power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Power supply. 236.516 Section 236.516..., Train Control and Cab Signal Systems Standards § 236.516 Power supply. Automatic cab signal, train stop, or train control device hereafter installed shall operate from a separate or isolated power supply...

  18. 47 CFR 80.915 - Main power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Main power supply. 80.915 Section 80.915... supply. (a) There must be readily available for use under normal load conditions a main power supply... required receiver. Under this load condition the potential of the main power supply at the power input...

  19. 47 CFR 80.915 - Main power supply.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Main power supply. 80.915 Section 80.915... supply. (a) There must be readily available for use under normal load conditions a main power supply... required receiver. Under this load condition the potential of the main power supply at the power input...

  20. 24 CFR 3280.803 - Power supply.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Power supply. 3280.803 Section 3280... DEVELOPMENT MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARDS Electrical Systems § 3280.803 Power supply. (a) The power supply to the manufactured home shall be a feeder assembly consisting of not more than one...

  1. A new bipolar Qtrim power supply system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mi, C.; Bruno, D.; Drozd, J.

    2015-05-03

    This year marks the 15th run of RHIC (Relativistic Heavy Ion Collider) operations. The reliability of superconducting magnet power supplies is one of the essential factors in the entire accelerator complex. Besides maintaining existing power supplies and their associated equipment, newly designed systems are also required based on the physicist’s latest requirements. A bipolar power supply was required for this year’s main quadruple trim power supply. This paper will explain the design, prototype, testing, installation and operation of this recently installed power supply system.

  2. 47 CFR 80.860 - Reserve power supply.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Reserve power supply. 80.860 Section 80.860... Reserve power supply. (a) When the main power supply is not on the same deck as the main wheelhouse or at least one deck above the vessel's main deck, a reserve power supply must be provided and must be so...

  3. 47 CFR 80.860 - Reserve power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Reserve power supply. 80.860 Section 80.860... Reserve power supply. (a) When the main power supply is not on the same deck as the main wheelhouse or at least one deck above the vessel's main deck, a reserve power supply must be provided and must be so...

  4. 47 CFR 80.917 - Reserve power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Reserve power supply. 80.917 Section 80.917... a reserve power supply located on the same deck as the main wheel house or at least one deck above the vessel's main deck, unless the main power supply is so situated. (b) The reserve power supply must...

  5. 47 CFR 80.917 - Reserve power supply.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Reserve power supply. 80.917 Section 80.917... a reserve power supply located on the same deck as the main wheel house or at least one deck above the vessel's main deck, unless the main power supply is so situated. (b) The reserve power supply must...

  6. Study on a hypothetical replacement of nuclear electricity by wind power in Sweden

    NASA Astrophysics Data System (ADS)

    Wagner, F.; Rachlew, E.

    2016-05-01

    The Swedish electricity supply system benefits strongly from the natural conditions which allow a high share of hydroelectricity. A complete supply is, however, not possible. Up to now, nuclear power is the other workhorse to serve the country with electricity. Thus, electricity production of Sweden is basically CO2 -free and Sweden has reached an environmental status which others in Europe plan to reach in 2050. Furthermore, there is an efficient exchange within the Nordic countries, Nordpol, which can ease possible capacity problems during dry cold years. In this study we investigate to what extent and with what consequences the base load supply of nuclear power can be replaced by intermittent wind power. Such a scenario leads unavoidably to high wind power installations. It is shown that hydroelectricity cannot completely smooth out the fluctuations of wind power and an additional back-up system using fossil fuel is necessary. From the operational dynamics, this system has to be based on gas. The back-up system cannot be replaced by a storage using surplus electricity from wind power. The surplus is too little. To overcome this, further strong extension of wind power is necessary which leads, however, to a reduction of the use of hydroelectricity if the annual consumption is kept constant. In this case one fossil-free energy form is replaced by another, however, more complex one. A mix of wind power at 22.3GW plus a gas based back-up system with 8.6GW producing together 64.8TWh would replace the present infrastructure with 9GW nuclear power producing 63.8TWh electricity. The specific CO2 -emission increases to the double in this case. Pumped storage for the exclusive supply of Sweden does not seem to be a meaningful investment.-1

  7. E-beam high voltage switching power supply

    DOEpatents

    Shimer, D.W.; Lange, A.C.

    1996-10-15

    A high-power power supply produces a controllable, constant high voltage output under varying and arcing loads. The power supply includes a voltage regulator, an inductor, an inverter for producing a high frequency square wave current of alternating polarity, an improved inverter voltage clamping circuit, a step up transformer, an output rectifier for producing a dc voltage at the output of each module, and a current sensor for sensing output current. The power supply also provides dynamic response to varying loads by controlling the voltage regulator duty cycle and circuitry is provided for sensing incipient arc currents at the output of the power supply to simultaneously decouple the power supply circuitry from the arcing load. The power supply includes a plurality of discrete switching type dc--dc converter modules. 5 figs.

  8. E-beam high voltage switching power supply

    DOEpatents

    Shimer, Daniel W.; Lange, Arnold C.

    1996-01-01

    A high-power power supply produces a controllable, constant high voltage put under varying and arcing loads. The power supply includes a voltage regulator, an inductor, an inverter for producing a high frequency square wave current of alternating polarity, an improved inverter voltage clamping circuit, a step up transformer, an output rectifier for producing a dc voltage at the output of each module, and a current sensor for sensing output current. The power supply also provides dynamic response to varying loads by controlling the voltage regulator duty cycle and circuitry is provided for sensing incipient arc currents at the output of the power supply to simultaneously decouple the power supply circuitry from the arcing load. The power supply includes a plurality of discrete switching type dc--dc converter modules.

  9. Multiple resonant railgun power supply

    DOEpatents

    Honig, E.M.; Nunnally, W.C.

    1985-06-19

    A multiple repetitive resonant railgun power supply provides energy for repetitively propelling projectiles from a pair of parallel rails. A plurality of serially connected paired parallel rails are powered by similar power supplies. Each supply comprises an energy storage capacitor, a storage inductor to form a resonant circuit with the energy storage capacitor and a magnetic switch to transfer energy between the resonant circuit and the pair of parallel rails for the propelling of projectiles. The multiple serial operation permits relatively small energy components to deliver overall relatively large amounts of energy to the projectiles being propelled.

  10. Multiple resonant railgun power supply

    DOEpatents

    Honig, Emanuel M.; Nunnally, William C.

    1988-01-01

    A multiple repetitive resonant railgun power supply provides energy for repetitively propelling projectiles from a pair of parallel rails. A plurality of serially connected paired parallel rails are powered by similar power supplies. Each supply comprises an energy storage capacitor, a storage inductor to form a resonant circuit with the energy storage capacitor and a magnetic switch to transfer energy between the resonant circuit and the pair of parallel rails for the propelling of projectiles. The multiple serial operation permits relatively small energy components to deliver overall relatively large amounts of energy to the projectiles being propelled.

  11. Low Power, High Voltage Power Supply with Fast Rise/Fall Time

    NASA Technical Reports Server (NTRS)

    Bearden, Douglas B. (Inventor)

    2007-01-01

    A low power, high voltage power supply system includes a high voltage power supply stage and a preregulator for programming the power supply stage so as to produce an output voltage which is a predetermined fraction of a desired voltage level. The power supply stage includes a high voltage, voltage doubler stage connected to receive the output voltage from the preregulator and for, when activated, providing amplification of the output voltage to the desired voltage level. A first feedback loop is connected between the output of the preregulator and an input of the preregulator while a second feedback loop is connected between the output of the power supply stage and the input of the preregulator.

  12. Low power, high voltage power supply with fast rise/fall time

    NASA Technical Reports Server (NTRS)

    Bearden, Douglas B. (Inventor)

    2007-01-01

    A low power, high voltage power supply system includes a high voltage power supply stage and a preregulator for programming the power supply stage so as to produce an output voltage which is a predetermined fraction of a desired voltage level. The power supply stage includes a high voltage, voltage doubler stage connected to receive the output voltage from the preregulator and for, when activated, providing amplification of the output voltage to the desired voltage level. A first feedback loop is connected between the output of the preregulator and an input of the preregulator while a second feedback loop is connected between the output of the power supply stage and the input of the preregulator.

  13. First evidence for "The backup plan paradox".

    PubMed

    Napolitano, Christopher M; Freund, Alexandra M

    2017-08-01

    This research is a first test of the backup plan paradox. We hypothesized that investing in a backup plan may facilitate the conditions that it was developed to address: Plan A's insufficiency. Five studies provide initial, primarily correlative support for the undermining effect of investing in a backup plan. Study 1 (n= 160) demonstrated that the more participants perceived they had invested in developing a backup plan (preparing a "crib sheet"), the more likely they were to use it, although greater investments were unrelated to backup plan utility. Studies 2-4 used a simulated negotiation task. Study 2 (n = 247) demonstrated that when goal-relevant resources are limited, investing in developing backup plans and perceiving them as highly instrumental can decrease goal performance through the indirect effect of increased means replacing. Study 3 (n = 248) replicated this effect when goal-relevant resources were plentiful. Study 4 (n = 204) used an experimental variant of the simulated negotiation task and demonstrated that simply having a backup plan is not detrimental, but perceiving backup plans to be highly instrumental decreased goal performance, again through the indirect effect of increased means replacing. Study 5 (n = 160) replicated findings from Studies 1-4 using a lab-based motor task (throwing a ball). Together, these results provide first evidence that backup plans can introduce costs that may jeopardize goal performance. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  14. 7 CFR 1710.303 - Power cost studies-power supply borrowers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Power cost studies-power supply borrowers. 1710.303... AND GUARANTEES Long-Range Financial Forecasts § 1710.303 Power cost studies—power supply borrowers. (a... facilities shall be supported by a power cost study to demonstrate that the proposed generation and...

  15. The near-source impacts of diesel backup generators in urban environments

    NASA Astrophysics Data System (ADS)

    Tong, Zheming; Zhang, K. Max

    2015-05-01

    Distributed power generation, located close to consumers, plays an important role in the current and future power systems. However, its near-source impacts in complex urban environments are not well understood. In this paper, we focused on diesel backup generators that participate in demand response (DR) programs. We first improved the micro-environmental air quality simulations by employing a meteorology processor, AERMET, to generate site-specific boundary layer parameters for the Large Eddy Simulation (LES) modeling. The modeling structure was then incorporated into the CTAG model to evaluate the environmental impacts of diesel backup generators in near-source microenvironments. We found that the presence of either tall upwind or downwind building can deteriorate the air quality in the near-stack street canyons, largely due to the recirculation zones generated by the tall buildings, reducing the near-stack dispersion. Decreasing exhaust momentum ratio (stack exit velocity/ambient wind velocity) draws more exhaust into the recirculation zone, and reduces the effective stack height, which results in elevated near-ground concentrations inside downwind street canyons. The near-ground PM2.5 concentration for the worst scenarios could well exceed 100 μg m-3, posing potential health risk to people living and working nearby. In general, older diesel backup generators (i.e., Tier 1, 2 or older) without the up-to-date emission control may significantly increase the pollutant concentration in the near-source street canyons if participating in DR programs. Even generators that comply with Tier-4 standards could lead to PM hotspots if their stacks are next to tall buildings. Our study implies that the siting of diesel backup generators stacks should consider not only the interactions of fresh air intake and exhaust outlet for the building housing the backup generators, but also the dispersion of exhaust plumes in the surrounding environment.

  16. 46 CFR 113.10-9 - Power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Power supply. 113.10-9 Section 113.10-9 Shipping COAST... SYSTEMS AND EQUIPMENT Fire and Smoke Detecting and Alarm Systems § 113.10-9 Power supply. (a) General... battery, the charger must be supplied from the final emergency power source. Upon loss of power to the...

  17. 46 CFR 113.10-9 - Power supply.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Power supply. 113.10-9 Section 113.10-9 Shipping COAST... SYSTEMS AND EQUIPMENT Fire and Smoke Detecting and Alarm Systems § 113.10-9 Power supply. (a) General... battery, the charger must be supplied from the final emergency power source. Upon loss of power to the...

  18. Power Supply For 25-Watt Arc Lamp

    NASA Technical Reports Server (NTRS)

    Leighty, B. D.

    1985-01-01

    Dual-voltage circuitry both strikes and maintains arc. New power supply designed (and several units already in use) that replaces relay/choke combination with solid-state starter. New power supply consists of two main sections. First section (low voltage power supply section) is 84-volt directcurrent supply. Second section (high-voltage starter circuit) is CockroftWalton voltage multiplier. Used as light sources for schlieren, shadowgraph, and other flow-visualization techniques.

  19. Resonant power supplies for a rapid-cycling accelerator

    NASA Astrophysics Data System (ADS)

    Karady, G.; Thiessen, H. A.; Schneider, E. J.

    1988-10-01

    A resonant power supply has been proposed as an efficient power supply for a future 60-GeV, Kaon-producing accelerator. The engineering design of the electric system of the main-ring power supplies is described. It is shown that the resonant power supply can be built with standard commercially available components. The most critical component is the bypass switch, which requires gate-turn off thyristors, connected in parallel. Standard metal-clad switchgear can be used for the AC system. The resonant power supplies can be fed directly from the 115-kV utility network, but the resonance power supplies draw pulse loads from the utility network. This pulse may produce disturbances. AC filter and reactive power compensation is needed for economical operation.

  20. TRANSISTOR HIGH VOLTAGE POWER SUPPLY

    DOEpatents

    Driver, G.E.

    1958-07-15

    High voltage, direct current power supplies are described for use with battery powered nuclear detection equipment. The particular advantages of the power supply described, are increased efficiency and reduced size and welght brought about by the use of transistors in the circuit. An important feature resides tn the employment of a pair of transistors in an alternatefiring oscillator circuit having a coupling transformer and other circuit components which are used for interconnecting the various electrodes of the transistors.

  1. 47 CFR 80.963 - Main power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Main power supply. 80.963 Section 80.963... MARITIME SERVICES Radiotelephone Installation Required for Vessels on the Great Lakes § 80.963 Main power supply. (a) A main power supply must be available at all times while the vessel is subject to the...

  2. 47 CFR 80.963 - Main power supply.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Main power supply. 80.963 Section 80.963... MARITIME SERVICES Radiotelephone Installation Required for Vessels on the Great Lakes § 80.963 Main power supply. (a) A main power supply must be available at all times while the vessel is subject to the...

  3. 47 CFR 80.965 - Reserve power supply.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Reserve power supply. 80.965 Section 80.965... power supply. (a) Each passenger vessel of more than 100 gross tons and each cargo vessel of more than 300 gross tons must be provided with a reserve power supply independent of the vessel's normal...

  4. 47 CFR 80.965 - Reserve power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Reserve power supply. 80.965 Section 80.965... power supply. (a) Each passenger vessel of more than 100 gross tons and each cargo vessel of more than 300 gross tons must be provided with a reserve power supply independent of the vessel's normal...

  5. Electromechanical battery design suitable for back-up power applications

    DOEpatents

    Post, Richard F.

    2002-01-01

    The windings that couple energy into and out of the rotor of an electro-mechanical battery are modified. The normal stator windings of the generator/motor have been replaced by two orthogonal sets of windings. Because of their orthogonality, they are decoupled from each other electrically, though each can receive (or deliver) power flows from the rotating field produced by the array of permanent magnets. Due to the orthogonal design of the stator windings and the high mechanical inertia of the flywheel rotor, the resulting power delivered to the computer system is completely insensitive to any and all electrical transients and variabilities of the power from the main power source. This insensitivity includes complete failure for a period determined only by the amount of stored kinetic energy in the E-M battery modules that are supplied. Furthermore there is no need whatsoever for fast-acting, fractional-cycle switches, such as are employed in conventional systems, and which are complicated to implement.

  6. Direct current uninterruptible power supply method and system

    DOEpatents

    Sinha, Gautam

    2003-12-02

    A method and system are described for providing a direct current (DC) uninterruptible power supply with the method including, for example: continuously supplying fuel to a turbine; converting mechanical power from the turbine into alternating current (AC) electrical power; converting the AC electrical power to DC power within a predetermined voltage level range; supplying the DC power to a load; and maintaining a DC load voltage within the predetermined voltage level range by adjusting the amount of fuel supplied to the turbine.

  7. 46 CFR 169.688 - Power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST... Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The... provide electric power for any vital system listed in § 169.642 of this subchapter, at least two...

  8. 46 CFR 169.688 - Power supply.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST... Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The... provide electric power for any vital system listed in § 169.642 of this subchapter, at least two...

  9. Onsite and Electric Backup Capabilities at Critical Infrastructure Facilities in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Phillips, Julia A.; Wallace, Kelly E.; Kudo, Terence Y.

    2016-04-01

    The following analysis, conducted by Argonne National Laboratory’s (Argonne’s) Risk and Infrastructure Science Center (RISC), details an analysis of electric power backup of national critical infrastructure as captured through the Department of Homeland Security’s (DHS’s) Enhanced Critical Infrastructure Program (ECIP) Initiative. Between January 1, 2011, and September 2014, 3,174 ECIP facility surveys have been conducted. This study focused first on backup capabilities by infrastructure type and then expanded to infrastructure type by census region.

  10. Mobile Uninterruptible Power Supply

    NASA Technical Reports Server (NTRS)

    Mears, Robert L.

    1990-01-01

    Proposed mobile unit provides 20 kVA of uninterruptible power. Used with mobile secondary power-distribution centers to provide power to test equipment with minimal cabling, hazards, and obstacles. Wheeled close to test equipment and system being tested so only short cable connections needed. Quickly moved and set up in new location. Uninterruptible power supply intended for tests which data lost or equipment damaged during even transient power failure.

  11. The Anaesthesia Gas Supply System

    PubMed Central

    Das, Sabyasachi; Chattopadhyay, Subhrajyoti; Bose, Payel

    2013-01-01

    The anaesthesia gas supply system is designed to provide a safe, cost-effective and convenient system for the delivery of medical gases at the point of-use. The doctrine of the anaesthesia gas supply system is based on four essential principles: Identity, continuity, adequacy and quality. Knowledge about gas supply system is an integral component of safe anaesthetic practice. Mishaps involving the malfunction or misuse of medical gas supply to operating theatres have cost many lives. The medical gases used in anaesthesia and intensive care are oxygen, nitrous oxide, medical air, entonox, carbon dioxide and heliox. Oxygen is one of the most widely used gases for life-support and respiratory therapy besides anaesthetic procedures. In this article, an effort is made to describe the production, storage and delivery of anaesthetic gases. The design of anaesthesia equipment must take into account the local conditions such as climate, demand and power supply. The operational policy of the gas supply system should have a backup plan to cater to the emergency need of the hospital, in the event of the loss of the primary source of supply. PMID:24249882

  12. Computer memory power control for the Galileo spacecraft

    NASA Technical Reports Server (NTRS)

    Detwiler, R. C.

    1983-01-01

    The developmental history, major design drives, and final topology of the computer memory power system on the Galileo spacecraft are described. A unique method of generating memory backup power directly from the fault current drawn during a spacecraft power overload or fault condition allows this system to provide continuous memory power. This concept provides a unique solution to the problem of volatile memory loss without the use of a battery of other large energy storage elements usually associated with uninterrupted power supply designs.

  13. Modular High Voltage Power Supply

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Newell, Matthew R.

    The goal of this project is to develop a modular high voltage power supply that will meet the needs of safeguards applications and provide a modular plug and play supply for use with standard electronic racks.

  14. E-beam high voltage switching power supply

    DOEpatents

    Shimer, Daniel W.; Lange, Arnold C.

    1997-01-01

    A high power, solid state power supply is described for producing a controllable, constant high voltage output under varying and arcing loads suitable for powering an electron beam gun or other ion source. The present power supply is most useful for outputs in a range of about 100-400 kW or more. The power supply is comprised of a plurality of discrete switching type dc-dc converter modules, each comprising a voltage regulator, an inductor, an inverter for producing a high frequency square wave current of alternating polarity, an improved inverter voltage clamping circuit, a step up transformer, and an output rectifier for producing a dc voltage at the output of each module. The inputs to the converter modules are fed from a common dc rectifier/filter and are linked together in parallel through decoupling networks to suppress high frequency input interactions. The outputs of the converter modules are linked together in series and connected to the input of the transmission line to the load through a decoupling and line matching network. The dc-dc converter modules are phase activated such that for n modules, each module is activated equally 360.degree./n out of phase with respect to a successive module. The phased activation of the converter modules, combined with the square current waveforms out of the step up transformers, allows the power supply to operate with greatly reduced output capacitance values which minimizes the stored energy available for discharge into an electron beam gun or the like during arcing. The present power supply also provides dynamic response to varying loads by controlling the voltage regulator duty cycle using simulated voltage feedback signals and voltage feedback loops. Circuitry is also provided for sensing incipient arc currents reflected at the output of the power supply and for simultaneously decoupling the power supply circuitry from the arcing load.

  15. E-beam high voltage switching power supply

    DOEpatents

    Shimer, D.W.; Lange, A.C.

    1997-03-11

    A high power, solid state power supply is described for producing a controllable, constant high voltage output under varying and arcing loads suitable for powering an electron beam gun or other ion source. The present power supply is most useful for outputs in a range of about 100-400 kW or more. The power supply is comprised of a plurality of discrete switching type dc-dc converter modules, each comprising a voltage regulator, an inductor, an inverter for producing a high frequency square wave current of alternating polarity, an improved inverter voltage clamping circuit, a step up transformer, and an output rectifier for producing a dc voltage at the output of each module. The inputs to the converter modules are fed from a common dc rectifier/filter and are linked together in parallel through decoupling networks to suppress high frequency input interactions. The outputs of the converter modules are linked together in series and connected to the input of the transmission line to the load through a decoupling and line matching network. The dc-dc converter modules are phase activated such that for n modules, each module is activated equally 360{degree}/n out of phase with respect to a successive module. The phased activation of the converter modules, combined with the square current waveforms out of the step up transformers, allows the power supply to operate with greatly reduced output capacitance values which minimizes the stored energy available for discharge into an electron beam gun or the like during arcing. The present power supply also provides dynamic response to varying loads by controlling the voltage regulator duty cycle using simulated voltage feedback signals and voltage feedback loops. Circuitry is also provided for sensing incipient arc currents reflected at the output of the power supply and for simultaneously decoupling the power supply circuitry from the arcing load. 7 figs.

  16. 46 CFR 169.688 - Power supply.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The...

  17. 46 CFR 169.688 - Power supply.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The...

  18. 46 CFR 169.688 - Power supply.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The...

  19. 49 CFR 236.551 - Power supply voltage; requirement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Power supply voltage; requirement. 236.551 Section... Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Locomotives § 236.551 Power supply voltage; requirement. The voltage of power supply shall be maintained within 10 percent of rated...

  20. 49 CFR 236.551 - Power supply voltage; requirement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Power supply voltage; requirement. 236.551 Section... Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Locomotives § 236.551 Power supply voltage; requirement. The voltage of power supply shall be maintained within 10 percent of rated...

  1. Study of Contactless Power Supply for Spindle Ultrasonic Vibrator

    NASA Astrophysics Data System (ADS)

    Chen, T. R.; Lee, Y. L.; Liu, H. T.; Chen, S. M.; Chang, H. Z.

    2017-11-01

    In this study, a contactless power supply for the ultrasonic motor on the spindle is proposed. The proposed power supply is composed of a series-parallel resonant circuit and a cylindrical contactless transformer. Based on the study and rotation experiments, it can be seen that the proposed power supply can both provide a stable ac power with 25 kHz / 70 V to the ultrasonic motor. When the output power is 250 W, the efficiency of the proposed supply is 89.8 % in respectively rotation tests. When the output power is more than 150 W, the efficiency of the proposed supply is higher than 80 % within the rated output power range.

  2. 47 CFR 80.875 - VHF radiotelephone power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false VHF radiotelephone power supply. 80.875 Section... to Subpart W § 80.875 VHF radiotelephone power supply. (a) There must be readily available for use under normal load conditions a power supply sufficient to simultaneously energize the VHF transmitter at...

  3. 47 CFR 80.875 - VHF radiotelephone power supply.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false VHF radiotelephone power supply. 80.875 Section... to Subpart W § 80.875 VHF radiotelephone power supply. (a) There must be readily available for use under normal load conditions a power supply sufficient to simultaneously energize the VHF transmitter at...

  4. 46 CFR 113.25-6 - Power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Power supply. 113.25-6 Section 113.25-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT General Emergency Alarm Systems § 113.25-6 Power supply. The emergency power source...

  5. 46 CFR 113.25-6 - Power supply.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Power supply. 113.25-6 Section 113.25-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT General Emergency Alarm Systems § 113.25-6 Power supply. The emergency power source...

  6. 46 CFR 113.25-6 - Power supply.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Power supply. 113.25-6 Section 113.25-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT General Emergency Alarm Systems § 113.25-6 Power supply. The emergency power source...

  7. 46 CFR 113.25-6 - Power supply.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Power supply. 113.25-6 Section 113.25-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT General Emergency Alarm Systems § 113.25-6 Power supply. The emergency power source...

  8. 46 CFR 113.25-6 - Power supply.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Power supply. 113.25-6 Section 113.25-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT General Emergency Alarm Systems § 113.25-6 Power supply. The emergency power source...

  9. 46 CFR 113.43-5 - Power supply.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Power supply. 113.43-5 Section 113.43-5 Shipping COAST... SYSTEMS AND EQUIPMENT Steering Failure Alarm Systems § 113.43-5 Power supply. Each steering failure alarm system must be supplied by a circuit that: (a) Is independent of other steering gear system and steering...

  10. 46 CFR 113.43-5 - Power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Power supply. 113.43-5 Section 113.43-5 Shipping COAST... SYSTEMS AND EQUIPMENT Steering Failure Alarm Systems § 113.43-5 Power supply. Each steering failure alarm system must be supplied by a circuit that: (a) Is independent of other steering gear system and steering...

  11. Power supply

    DOEpatents

    Hart, Edward J.; Leeman, James E.; MacDougall, Hugh R.; Marron, John J.; Smith, Calvin C.

    1976-01-01

    An electric power supply employs a striking means to initiate ferroelectric elements which provide electrical energy output which subsequently initiates an explosive charge which initiates a second ferroelectric current generator to deliver current to the coil of a magnetic field current generator, creating a magnetic field around the coil. Continued detonation effects compression of the magnetic field and subsequent generation and delivery of a large output current to appropriate output loads.

  12. 2009 Joint Service Power Expo volume 2 video

    DTIC Science & Technology

    2009-05-07

    8483 - “A Field-Portable Lithium Ion Battery Charger with UPS Back-up Capability”, Mr. Neil Steven Graves, Acumentrics · 8394 - “Kestrel...Control”, Mr. Rick Silva, Sr. System Engineer, Custom Manufacturing & Engineering, Inc · 8371 - “New Application of Lithium - Ion Battery in Hybrid Power Supply System”, Mr. Takefumi Inoue, GS Yuasa Corporation

  13. Space Station Freedom power supply commonality via modular design

    NASA Technical Reports Server (NTRS)

    Krauthamer, S.; Gangal, M. D.; Das, R.

    1990-01-01

    At mature operations, Space Station Freedom will need more than 2000 power supplies to feed housekeeping and user loads. Advanced technology power supplies from 20 to 250 W have been hybridized for terrestrial, aerospace, and industry applications in compact, efficient, reliable, lightweight packages compatible with electromagnetic interference requirements. The use of these hybridized packages as modules, either singly or in parallel, to satisfy the wide range of user power supply needs for all elements of the station is proposed. Proposed characteristics for the power supplies include common mechanical packaging, digital control, self-protection, high efficiency at full and partial loads, synchronization capability to reduce electromagnetic interference, redundancy, and soft-start capability. The inherent reliability is improved compared with conventional discrete component power supplies because the hybrid circuits use high-reliability components such as ceramic capacitors. Reliability is further improved over conventional supplies because the hybrid packages, which may be treated as a single part, reduce the parts count in the power supply.

  14. 14 CFR 29.1331 - Instruments using a power supply.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Instruments using a power supply. 29.1331....1331 Instruments using a power supply. For category A rotorcraft— (a) Each required flight instrument using a power supply must have— (1) Two independent sources of power; (2) A means of selecting either...

  15. 14 CFR 29.1331 - Instruments using a power supply.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Instruments using a power supply. 29.1331....1331 Instruments using a power supply. For category A rotorcraft— (a) Each required flight instrument using a power supply must have— (1) Two independent sources of power; (2) A means of selecting either...

  16. Methods for maintaining the continuity of power supply in hospitals

    NASA Astrophysics Data System (ADS)

    Mihut, V. V.; Panoiu, M.; Panoiu, C.; Baciu, I.

    2018-01-01

    This paper presents alternative solutions to ensure power supply of critical consumer, such hospitals. In a hospital it is extremely important to have a power supply without any interruption. This is the reason of the using various solutions that ensure continuity of power supply. In this paper it is presented a solution used in a hospital in Romania. Here is used a generator controlled by microprocessor capable of taking over power supply in case there are problems with power supply from the national power grid.

  17. Discontinuous Mode Power Supply

    NASA Technical Reports Server (NTRS)

    Lagadinos, John; Poulos, Ethel

    2012-01-01

    A document discusses the changes made to a standard push-pull inverter circuit to avoid saturation effects in the main inverter power supply. Typically, in a standard push-pull arrangement, the unsymmetrical primary excitation causes variations in the volt second integral of each half of the excitation cycle that could lead to the establishment of DC flux density in the magnetic core, which could eventually cause saturation of the main inverter transformer. The relocation of the filter reactor normally placed across the output of the power supply solves this problem. The filter reactor was placed in series with the primary circuit of the main inverter transformer, and is presented as impedance against the sudden changes on the input current. The reactor averaged the input current in the primary circuit, avoiding saturation of the main inverter transformer. Since the implementation of the described change, the above problem has not reoccurred, and failures in the main power transistors have been avoided.

  18. 76 FR 4147 - Putnam-Cumberland, TN-Improve Power Supply

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-24

    ... TENNESSEE VALLEY AUTHORITY Putnam-Cumberland, TN--Improve Power Supply AGENCY: Tennessee Valley... proposed electrical power supply improvements in the Putnam and Cumberland region of east-central Tennessee... supplies bulk electric power to Cumberland and Putnam counties and the immediately surrounding areas in...

  19. Applying secret sharing for HIS backup exchange.

    PubMed

    Kuroda, Tomohiro; Kimura, Eizen; Matsumura, Yasushi; Yamashita, Yoshinori; Hiramatsu, Haruhiko; Kume, Naoto; Sato, Atsushi

    2013-01-01

    To secure business continuity is indispensable for hospitals to fulfill its social responsibility under disasters. Although to back up the data of the hospital information system (HIS) at multiple remote sites is a key strategy of business continuity plan (BCP), the requirements to treat privacy sensitive data jack up the cost for the backup. The secret sharing is a method to split an original secret message up so that each individual piece is meaningless, but putting sufficient number of pieces together to reveal the original message. The secret sharing method eases us to exchange HIS backups between multiple hospitals. This paper evaluated the feasibility of the commercial secret sharing solution for HIS backup through several simulations. The result shows that the commercial solution is feasible to realize reasonable HIS backup exchange platform when template of contract between participating hospitals is ready.

  20. Troubleshooting of signal power supply system for Shanghai metro line 7

    NASA Astrophysics Data System (ADS)

    Lu, Kaixia; Xiao, Jie

    2018-03-01

    With the rapid development of Urban Rail Transit Signal Technology, the demand of signal power supply system for signal equipment is higher and higher. The signal intelligent power supply panel is the main component of the urban rail traffic signal power supply system. Whether the intelligent power supply panel working or not is directly related to traffic safety. The maintenance of intelligent signal power supply panel is particularly important. Line 7 of Shanghai Metro adopts PMZG Signal Intelligent Power Supply Panel, which is produced by Beijing Jinyujiaxin Polytron Technologies Inc. Maintenance of power supply system mainly includes routine maintenance and troubleshooting. This article will make clear the routine maintenance contents of PMZG Signal Intelligent Power Supply Panel, and put forward the common fault information and troubleshooting methods of PMZG Signal Intelligent Power Supply Panel. In accordance with the steps of fault handling, the faults can be eliminated in the shortest possible time, and PMZG Signal Intelligent Power Supply Panel can be quickly restored to normal working state.

  1. 7 CFR 1710.302 - Financial forecasts-power supply borrowers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Financial forecasts-power supply borrowers. 1710.302... AND GUARANTEES Long-Range Financial Forecasts § 1710.302 Financial forecasts—power supply borrowers. (a) The requirements of this section apply only to financial forecasts submitted by power supply...

  2. Spacecraft high-voltage power supply construction

    NASA Technical Reports Server (NTRS)

    Sutton, J. F.; Stern, J. E.

    1975-01-01

    The design techniques, circuit components, fabrication techniques, and past experience used in successful high-voltage power supplies for spacecraft flight systems are described. A discussion of the basic physics of electrical discharges in gases is included and a design rationale for the prevention of electrical discharges is provided. Also included are typical examples of proven spacecraft high-voltage power supplies with typical specifications for design, fabrication, and testing.

  3. 46 CFR 113.43-5 - Power supply.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Power supply. 113.43-5 Section 113.43-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT Steering Failure Alarm Systems § 113.43-5 Power supply. Each steering failure alarm...

  4. 46 CFR 113.43-5 - Power supply.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Power supply. 113.43-5 Section 113.43-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT Steering Failure Alarm Systems § 113.43-5 Power supply. Each steering failure alarm...

  5. 46 CFR 113.43-5 - Power supply.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Power supply. 113.43-5 Section 113.43-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT Steering Failure Alarm Systems § 113.43-5 Power supply. Each steering failure alarm...

  6. Gemini 8 prime and backup crews during press conference

    NASA Image and Video Library

    1966-02-26

    S66-24380 (26 Feb. 1966) --- Gemini-8 prime and backup crews during press conference. Left to right are astronauts David R. Scott, prime crew pilot; Neil A. Armstrong, prime crew command pilot; Charles Conrad Jr., backup crew command pilot; and Richard F. Gordon Jr., backup crew pilot. Photo credit: NASA

  7. Dependence and power in healthcare equipment supply chains.

    PubMed

    de Jong, Jurriaan L; Benton, W C

    2018-03-05

    Most healthcare organizations (HCOs) engage Group Purchasing Organizations (GPOs) as an outsourcing strategy to secure their supplies and materials. When an HCO outsources the procurement function to a GPO, this GPO will directly interact with the HCO's supplier on the HCO's behalf. This study investigates how an HCO's dependence on a GPO affects supply chain relationships and power in the healthcare medical equipment supply chain. Hypotheses are tested through factor analysis and structural equation modeling, using primary survey data from HCO procurement managers. An HCO's dependence on a GPO is found to be positively associated with a GPO's reliance on mediated power, but, surprisingly, negatively associated with a GPO's mediated power. Furthermore, analysis indicates that an HCO's dependence on a GPO is positively associated with an HCO's dependence on a GPO-contracted Original Equipment Manufacturer (OEM). HCO reliance on GPOs may lead to a buyer's dependence trap, where HCOs are increasingly dependent on GPOs and OEMs. Implications for HCO procurement managers and recommended steps for mitigation are offered. Power-dependence relationships in the medical equipment supply chain are not consistent with relationships in other, more traditional, supply chains. While dependence in a supply chain relationship typically leads to an increase in reliance on mediated power, GPO-dependent HCOs instead perceive a decrease in GPO mediated power. Furthermore, HCOs that rely on procurement service from GPOs are increasingly dependent on the OEMs.

  8. 14 CFR 25.1331 - Instruments using a power supply.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Instruments using a power supply. 25.1331....1331 Instruments using a power supply. (a) For each instrument required by § 25.1303(b) that uses a power supply, the following apply: (1) Each instrument must have a visual means integral with, the...

  9. Backup Attitude Control Algorithms for the MAP Spacecraft

    NASA Technical Reports Server (NTRS)

    ODonnell, James R., Jr.; Andrews, Stephen F.; Ericsson-Jackson, Aprille J.; Flatley, Thomas W.; Ward, David K.; Bay, P. Michael

    1999-01-01

    The Microwave Anisotropy Probe (MAP) is a follow-on to the Differential Microwave Radiometer (DMR) instrument on the Cosmic Background Explorer (COBE) spacecraft. The MAP spacecraft will perform its mission, studying the early origins of the universe, in a Lissajous orbit around the Earth-Sun L(sub 2) Lagrange point. Due to limited mass, power, and financial resources, a traditional reliability concept involving fully redundant components was not feasible. This paper will discuss the redundancy philosophy used on MAP, describe the hardware redundancy selected (and why), and present backup modes and algorithms that were designed in lieu of additional attitude control hardware redundancy to improve the odds of mission success. Three of these modes have been implemented in the spacecraft flight software. The first onboard mode allows the MAP Kalman filter to be used with digital sun sensor (DSS) derived rates, in case of the failure of one of MAP's two two-axis inertial reference units. Similarly, the second onboard mode allows a star tracker only mode, using attitude and derived rate from one or both of MAP's star trackers for onboard attitude determination and control. The last backup mode onboard allows a sun-line angle offset to be commanded that will allow solar radiation pressure to be used for momentum management and orbit stationkeeping. In addition to the backup modes implemented on the spacecraft, two backup algorithms have been developed in the event of less likely contingencies. One of these is an algorithm for implementing an alternative scan pattern to MAP's nominal dual-spin science mode using only one or two reaction wheels and thrusters. Finally, an algorithm has been developed that uses thruster one shots while in science mode for momentum management. This algorithm has been developed in case system momentum builds up faster than anticipated, to allow adequate momentum management while minimizing interruptions to science. In this paper, each mode and

  10. Analysis of power supply circuits for electroluminescent panels

    NASA Astrophysics Data System (ADS)

    Drumea, Andrei; Dobre, Robert Alexandru

    2016-12-01

    The electroluminescent panel is a light emitting device that requires for normal operations alternative voltages with peak to peak amplitudes in 100V… 300V range and frequencies in 100Hz … 2 kHz range. Its advantages, when compared with standard light sources like incandescent lamps, gas-discharge lamps or light emitting diodes (LEDs), are lower power consumption, flexible substrate and uniform light without observable luminous points. One disadvantage of electroluminescent panels is the complex power supply required to drive them, but the continuous improvement in passive and active integrated devices for switched mode power supplies will eventually solve this issue. The present paper studies different topologies for these power supplies and the effect of the electric parameters like the amplitude, frequency, waveform of the supplying voltage on the light emission and on power consumption for electroluminescent panels with different size and colors.

  11. STS-108 backup crew member Robinson in an M-113

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- Astronaut Stephen K. Robinson takes his turn at driving an M-113 armored personnel carrier. Robinson is a backup crew member for the International Space Station Expedition 4 crew, who are flying on Space Shuttle Endeavour as part of mission STS-108. Both the mission crew and Expedition 4 crews are at KSC for Terminal Countdown Demonstration Test activities. The TCDT includes emergency exit from the launch pad and a simulated launch countdown. The 11-day mission will also carry the Multi-Purpose Logistics Module Raffaello, filled with supplies and equipment. STS-108 is scheduled to launch Nov. 29.

  12. Repetitive resonant railgun power supply

    DOEpatents

    Honig, E.M.; Nunnally, W.C.

    1985-06-19

    A repetitive resonant railgun power supply provides energy for repetitively propelling projectiles from a pair of parallel rails. The supply comprises an energy storage capacitor, a storage inductor to form a resonant circuit with the energy storage capacitor and a magnetic switch to transfer energy between the resonant circuit and the pair of parallel rails for the propelling of projectiles.

  13. Repetitive resonant railgun power supply

    DOEpatents

    Honig, Emanuel M.; Nunnally, William C.

    1988-01-01

    A repetitive resonant railgun power supply provides energy for repetitively propelling projectiles from a pair of parallel rails. The supply comprises an energy storage capacitor, a storage inductor to form a resonant circuit with the energy storage capacitor and a magnetic switch to transfer energy between the resonant circuit and the pair of parallel rails for the propelling of projectiles.

  14. 49 CFR 393.23 - Power supply for lamps.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Power supply for lamps. 393.23 Section 393.23... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.23 Power supply for lamps. All required lamps must be powered by the electrical system of the motor vehicle with the...

  15. 49 CFR 393.23 - Power supply for lamps.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 5 2012-10-01 2012-10-01 false Power supply for lamps. 393.23 Section 393.23... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.23 Power supply for lamps. All required lamps must be powered by the electrical system of the motor vehicle with the...

  16. Solid state modulator for klystron power supply XFEL TDS INJ

    NASA Astrophysics Data System (ADS)

    Zavadtsev, A. A.; Zavadtsev, D. A.; Zybin, D. A.; Churanov, D. V.; Shemarykin, P. V.

    2016-09-01

    The transverse deflecting system XFEL TDS INJ for European X-ray Free Electron Laser includes power supply for the CPI VKS-8262HS klystron. It has been designed for pulse high-voltage, cathode heating, solenoid and klystron ion pump. The klystron power supply includes solid state modulator, pulse transformer, controlled power supply for cathode heating and commercial power supplies for solenoid and ion pump. Main parameters of the modulator are 110 kV of peak voltage, 72 A peak current, and pulse length up to 6 μs. The klystron power supply has been developed, designed, manufactured, tuned, tested and installed in the XFEL building. All designed parameters are satisfied.

  17. 24 CFR 3280.803 - Power supply.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...-Wiring Devices-Dimensional Specifications). (g) The overall length of a power-supply cord, measured from... supply shall be by means of: (1) One mast weatherhead installation installed in accordance with Article... underside of the manufactured home. The manufacturer shall provide in his written installation instructions...

  18. Long-pulse power-supply system for EAST neutral-beam injectors

    NASA Astrophysics Data System (ADS)

    Liu, Zhimin; Jiang, Caichao; Pan, Junjun; Liu, Sheng; Xu, Yongjian; Chen, Shiyong; Hu, Chundong; NBI Team

    2017-05-01

    The long-pulse power-supply system equipped for the 4 MW beam-power ion source is comprised of three units at ASIPP (Institute of Plasma Physics, Chinese Academy of Sciences): one for the neutral-beam test stand and two for the EAST neutral-beam injectors (NBI-1 and NBI-2, respectively). Each power supply system consists of two low voltage and high current DC power supplies for plasma generation of the ion source, and two high voltage and high current DC power supplies for the accelerator grid system. The operation range of the NB power supply is about 80 percent of the design value, which is the safe and stable operation range. At the neutral-beam test stand, a hydrogen ion beam with a beam pulse of 150 s, beam power of 1.5 MW and beam energy of 50 keV was achieved during the long-pulse testing experiments. The result shows that the power-supply system meets the requirements of the EAST-NBIs fully and lays a basis for achieving plasma heating.

  19. Superconducting Magnet Power Supply and Hard-Wired Quench Protection at Jefferson Lab for 12 GeV Upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ghoshal, Probir K.; Bachimanchi, Ramakrishna; Fair, Ruben J.

    The superconducting magnet system in Hall B being designed and built as part of the Jefferson Lab 12 GeV upgrade requires powering two conduction cooled superconducting magnets - a torus and a solenoid. The torus magnet is designed to operate at 3770 A and solenoid at 2416 A. Failure Modes and Effects Analysis (FMEA) determined that voltage level thresholds and dump switch operation for magnet protection should be tested and analyzed before incorporation into the system. The designs of the quench protection and voltage tap sub-systems were driven by the requirement to use a primary hard-wired quench detection sub-system togethermore » with a secondary PLC-based protection. Parallel path voltage taps feed both the primary and secondary quench protection sub-systems. The PLC based secondary protection is deployed as a backup for the hard-wired quench detection sub-system and also acts directly on the dump switch. Here, we describe a series of tests and modifications carried out on the magnet power supply and quench protection system to ensure that the superconducting magnet is protected for all fault scenarios.« less

  20. Superconducting Magnet Power Supply and Hard-Wired Quench Protection at Jefferson Lab for 12 GeV Upgrade

    DOE PAGES

    Ghoshal, Probir K.; Bachimanchi, Ramakrishna; Fair, Ruben J.; ...

    2017-10-05

    The superconducting magnet system in Hall B being designed and built as part of the Jefferson Lab 12 GeV upgrade requires powering two conduction cooled superconducting magnets - a torus and a solenoid. The torus magnet is designed to operate at 3770 A and solenoid at 2416 A. Failure Modes and Effects Analysis (FMEA) determined that voltage level thresholds and dump switch operation for magnet protection should be tested and analyzed before incorporation into the system. The designs of the quench protection and voltage tap sub-systems were driven by the requirement to use a primary hard-wired quench detection sub-system togethermore » with a secondary PLC-based protection. Parallel path voltage taps feed both the primary and secondary quench protection sub-systems. The PLC based secondary protection is deployed as a backup for the hard-wired quench detection sub-system and also acts directly on the dump switch. Here, we describe a series of tests and modifications carried out on the magnet power supply and quench protection system to ensure that the superconducting magnet is protected for all fault scenarios.« less

  1. Modular high voltage power supply for chemical analysis

    DOEpatents

    Stamps, James F [Livermore, CA; Yee, Daniel D [Dublin, CA

    2007-01-09

    A high voltage power supply for use in a system such as a microfluidics system, uses a DC--DC converter in parallel with a voltage-controlled resistor. A feedback circuit provides a control signal for the DC--DC converter and voltage-controlled resistor so as to regulate the output voltage of the high voltage power supply, as well as, to sink or source current from the high voltage supply.

  2. Modular high voltage power supply for chemical analysis

    DOEpatents

    Stamps, James F [Livermore, CA; Yee, Daniel D [Dublin, CA

    2010-05-04

    A high voltage power supply for use in a system such as a microfluidics system, uses a DC-DC converter in parallel with a voltage-controlled resistor. A feedback circuit provides a control signal for the DC-DC converter and voltage-controlled resistor so as to regulate the output voltage of the high voltage power supply, as well as, to sink or source current from the high voltage supply.

  3. Modular high voltage power supply for chemical analysis

    DOEpatents

    Stamps, James F [Livermore, CA; Yee, Daniel D [Dublin, CA

    2008-07-15

    A high voltage power supply for use in a system such as a microfluidics system, uses a DC-DC converter in parallel with a voltage-controlled resistor. A feedback circuit provides a control signal for the DC-DC converter and voltage-controlled resistor so as to regulate the output voltage of the high voltage power supply, as well as, to sink or source current from the high voltage supply.

  4. Mars sample return power supply

    NASA Technical Reports Server (NTRS)

    Hoang, Don; Ludwigs, Sharon; Schmitz, Paul; Wright, John

    1988-01-01

    A power supply is designed for a vehicle able to operate on the surface of Mars for a period of 5 to 10 years. This vehicle will be used for sample and data collection. The design is based on the assumption that the vehicle will be unmanned. Also, there will be no means by which components could be repaired or replaced while on the Martian surface. A consequence of this is that all equipment must meet high standards of reliability and, if possible, redundancy. Power will be supplied to the vehicle by means of a General Purpose Heat Source capable of producing a minimum of 7 kW of thermal power. The heat generated from the General Purpose Heat Source will be transferred to a Stirling engine via hot side heat pipes. The Stirling engine will then convert this heat into 2 kW of electrical power. Cold side heat pipes will be used to carry away waste heat, which will be released to the Martian environment via radiators connected to the end of the cold side heat pipes.

  5. 46 CFR 113.25-7 - Power supply overcurrent protection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Power supply overcurrent protection. 113.25-7 Section... COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT General Emergency Alarm Systems § 113.25-7 Power supply overcurrent protection. (a) If the general emergency alarm system is the only load supplied by the general...

  6. 46 CFR 113.25-7 - Power supply overcurrent protection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Power supply overcurrent protection. 113.25-7 Section... COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT General Emergency Alarm Systems § 113.25-7 Power supply overcurrent protection. (a) If the general emergency alarm system is the only load supplied by the general...

  7. 49 CFR 393.23 - Power supply for lamps.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Power supply for lamps. 393.23 Section 393.23 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.23 Power supply for...

  8. 49 CFR 393.23 - Power supply for lamps.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Power supply for lamps. 393.23 Section 393.23 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.23 Power supply for...

  9. Power supply standardization and optimization study

    NASA Technical Reports Server (NTRS)

    Ware, C. L.; Ragusa, E. V.

    1972-01-01

    A comprehensive design study of a power supply for use in the space shuttle and other space flight applications is presented. The design specifications are established for a power supply capable of supplying over 90 percent of the anticipated voltage requirements for future spacecraft avionics systems. Analyses and tradeoff studies were performed on several alternative design approaches to assure that the selected design would provide near optimum performance of the planned applications. The selected design uses a dc-to-dc converter incorporating regenerative current feedback with a time-ratio controlled duty cycle to achieve high efficiency over a wide variation in input voltage and output loads. The packaging concept uses an expandable mainframe capable of accommodating up to six inverter/regulator modules with one common input filter module.

  10. Intelligent vehicle electrical power supply system with central coordinated protection

    NASA Astrophysics Data System (ADS)

    Yang, Diange; Kong, Weiwei; Li, Bing; Lian, Xiaomin

    2016-07-01

    The current research of vehicle electrical power supply system mainly focuses on electric vehicles (EV) and hybrid electric vehicles (HEV). The vehicle electrical power supply system used in traditional fuel vehicles is rather simple and imperfect; electrical/electronic devices (EEDs) applied in vehicles are usually directly connected with the vehicle's battery. With increasing numbers of EEDs being applied in traditional fuel vehicles, vehicle electrical power supply systems should be optimized and improved so that they can work more safely and more effectively. In this paper, a new vehicle electrical power supply system for traditional fuel vehicles, which accounts for all electrical/electronic devices and complex work conditions, is proposed based on a smart electrical/electronic device (SEED) system. Working as an independent intelligent electrical power supply network, the proposed system is isolated from the electrical control module and communication network, and access to the vehicle system is made through a bus interface. This results in a clean controller power supply with no electromagnetic interference. A new practical battery state of charge (SoC) estimation method is also proposed to achieve more accurate SoC estimation for lead-acid batteries in traditional fuel vehicles so that the intelligent power system can monitor the status of the battery for an over-current state in each power channel. Optimized protection methods are also used to ensure power supply safety. Experiments and tests on a traditional fuel vehicle are performed, and the results reveal that the battery SoC is calculated quickly and sufficiently accurately for battery over-discharge protection. Over-current protection is achieved, and the entire vehicle's power utilization is optimized. For traditional fuel vehicles, the proposed vehicle electrical power supply system is comprehensive and has a unified system architecture, enhancing system reliability and security.

  11. The cost of power outages in the business and public sectors in Israel: Revealed preference vs. subjective evaluation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beenstock, M.; Goldin, E.; Haitovsky, Y.

    1997-05-01

    The economic cost of power outages is a central parameter in the cost-benefit analysis of electric power reliability and the design of electric power systems. The authors present a new methodology for estimating the cost of power outages in the business and public sections and illustrate with data for Israel. The methodology is based on the principle of revealed preference, the cost of an outage may be inferred from the actions taken by consumers to mitigate losses induced by unsupplied electricity. If outages impose costs on businesses, managers are likely to invest in back-up power to mitigate the losses thatmore » are incurred when electricity is not supplied. Investment in back-up generators may then be used to impute the mitigated and unmitigated damage from outages. 12 refs., 3 figs., 7 tabs.« less

  12. Recommended high-tank temperatures for maintenance of high-tank backup support, Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Greager, O.H.

    1964-05-20

    Purpose of this note is to recommend revised curves for the high-tank temperature required to maintain adequate high-tank backup support at the six small reactors. Compliance with the conditions shown on these curves will ensure adequate high-tank flow rates following the simultaneous loss of electric and steam power.

  13. High voltage DC power supply

    DOEpatents

    Droege, T.F.

    1989-12-19

    A high voltage DC power supply having a first series resistor at the output for limiting current in the event of a short-circuited output, a second series resistor for sensing the magnitude of output current, and a voltage divider circuit for providing a source of feedback voltage for use in voltage regulation is disclosed. The voltage divider circuit is coupled to the second series resistor so as to compensate the feedback voltage for a voltage drop across the first series resistor. The power supply also includes a pulse-width modulated control circuit, having dual clock signals, which is responsive to both the feedback voltage and a command voltage, and also includes voltage and current measuring circuits responsive to the feedback voltage and the voltage developed across the second series resistor respectively. 7 figs.

  14. High voltage DC power supply

    DOEpatents

    Droege, Thomas F.

    1989-01-01

    A high voltage DC power supply having a first series resistor at the output for limiting current in the event of a short-circuited output, a second series resistor for sensing the magnitude of output current, and a voltage divider circuit for providing a source of feedback voltage for use in voltage regulation is disclosed. The voltage divider circuit is coupled to the second series resistor so as to compensate the feedback voltage for a voltage drop across the first series resistor. The power supply also includes a pulse-width modulated control circuit, having dual clock signals, which is responsive to both the feedback voltage and a command voltage, and also includes voltage and current measuring circuits responsive to the feedback voltage and the voltage developed across the second series resistor respectively.

  15. 14 CFR 29.1331 - Instruments using a power supply.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... from one source, or a fault in any part of the power distribution system does not interfere with the... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Instruments using a power supply. 29.1331....1331 Instruments using a power supply. For category A rotorcraft— (a) Each required flight instrument...

  16. 14 CFR 29.1331 - Instruments using a power supply.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... from one source, or a fault in any part of the power distribution system does not interfere with the... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Instruments using a power supply. 29.1331....1331 Instruments using a power supply. For category A rotorcraft— (a) Each required flight instrument...

  17. 14 CFR 29.1331 - Instruments using a power supply.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... from one source, or a fault in any part of the power distribution system does not interfere with the... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Instruments using a power supply. 29.1331....1331 Instruments using a power supply. For category A rotorcraft— (a) Each required flight instrument...

  18. A case of a power failure in the operating room.

    PubMed

    Yasny, Jeffrey; Soffer, Robert

    2005-01-01

    In the operating room, safely administering anesthesia amidst a major power failure can instantly present one with a formidable challenge. A case is presented involving a 23-year-old healthy woman who underwent a complex oral and maxillofacial surgery to correct a dentofacial deformity. Three hours into the case and with the patient's maxilla downfractured, the overhead surgical lights blacked out, and there was an apparent loss of the anesthesia machine's ability to function. Providing adequate oxygenation, ventilation, anesthesia levels, monitoring of vital signs, and transportation of the patient were some of the challenges faced, and the response to this unexpected event is recounted. The importance of one's familiarity with an anesthesia machine's backup battery supply, routinely checking machinery, ensuring that appropriate and sufficient supplies are readily available, exercising calm leadership with clear communication, and formulating a clear plan with backup alternatives are discussed. Various recommendations are proposed with respect to the preparation for and the prevention of a power failure in the operating room. This report's account of events is aimed to "shed some light" on this topic, serve as a check of one's own preparedness, and facilitate the optimal management of a similarly unexpected incident.

  19. Power supply sharing in the Apollo telescope mount electrical power system

    NASA Technical Reports Server (NTRS)

    Lanier, R., Jr.; Kapustka, R.

    1977-01-01

    A modular dc power supply power sharing technique was developed for the Apollo telescope mount electrical power sytem on Skylab. The advantages and disadvantages of various techniques used are reviewed and compared. The new technique design is discussed, and results of its implementation in the power system are reviewed.

  20. A new topology and control method for electromagnetic transmitter power supplies

    NASA Astrophysics Data System (ADS)

    Zhang, Yiming; Zhang, Jialin; Yuan, Dakang

    2017-04-01

    As essential equipment for electromagnetic exploration, electromagnetic transmitter reverse the steady power supply with desired frequency and transmit the power through grounding electrodes. To obtain effective geophysical data during deep exploration, the transmitter needs to be high-voltage, high-current, with high-accuracy output, and yet compact and light. The researches on the power supply technologies for high-voltage high-power electromagnetic transmitter is of significant importance to the deep geophysical explorations. Therefore, the performance of electromagnetic transmitter is mainly subject to the following two aspects: the performance of emission current and voltage, and the power density. These requirements bring technical difficulties to the development of power supplies. Conventionally, high-frequency switching power supplies are applied in the design of a high-power transmitter power supply. However, the structure of the topology is complicate, which may reduce the controllability of the output voltage and the reliability of the system. Without power factor control, the power factor of the structure is relatively low. Moreover high switching frequency causes high loss. With the development of the PWM (pulse width modulation) technique, its merits of simple structure, low loss, convenient control and unit power factor have made it popular in electrical energy feedback, active filter, and power factor compensation. Studies have shown that using PWM converters and space vector modulation have become the trend in designing transmitter power supply. However, the earth load exhibits different impedances at different frequencies. Thus ensuing high-accuracy and a stable output from a transmitter power supply in harsh environment has become a key topic in the design of geophysical exploration instruments. Based on SVPWM technology, an electromagnetic transmitter power supply has been designed and its control strategy has been studied. The transmitting

  1. Thermal control of power supplies with electronic packaging techniques

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The analysis, design, and development work to reduce the weight and size of a standard modular power supply with a 350 watt output was summarized. By integrating low cost commercial heat pipes in the redesign of this power supply, weight was reduced by 30% from that of the previous design. The temperature was also appreciably reduced, increasing the environmental capability of the unit. A demonstration unit with a 100 watt output and a 15 volt regulator module, plus simulated output modules, was built and tested to evaluate the thermal performance of the redesigned power supply.

  2. Development of compact rapid charging power supply for capacitive energy storage in pulsed power drivers.

    PubMed

    Sharma, Surender Kumar; Shyam, Anurag

    2015-02-01

    High energy capacitor bank is used for primary electrical energy storage in pulsed power drivers. The capacitors used in these pulsed power drivers have low inductance, low internal resistance, and less dc life, so it has to be charged rapidly and immediately discharged into the load. A series resonant converter based 45 kV compact power supply is designed and developed for rapid charging of the capacitor bank with constant charging current up to 150 mA. It is short circuit proof, and zero current switching technique is used to commute the semiconductor switch. A high frequency resonant inverter switching at 10 kHz makes the overall size small and reduces the switching losses. The output current of the power supply is limited by constant on-time and variable frequency switching control technique. The power supply is tested by charging the 45 kV/1.67 μF and 15 kV/356 μF capacitor banks. It has charged the capacitor bank up to rated voltage with maximum charging current of 150 mA and the average charging rate of 3.4 kJ/s. The output current of the power supply is limited by reducing the switching frequency at 5 kHz, 3.3 kHz, and 1.7 kHz and tested with 45 kV/1.67 μF capacitor bank. The protection circuit is included in the power supply for over current, under voltage, and over temperature. The design details and the experimental testing results of the power supply for resonant current, output current, and voltage traces of the power supply with capacitive, resistive, and short circuited load are presented and discussed.

  3. 46 CFR 161.002-9 - Automatic fire detecting system, power supply.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Automatic fire detecting system, power supply. 161.002-9 Section 161.002-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT...-9 Automatic fire detecting system, power supply. The power supply for an automatic fire detecting...

  4. 46 CFR 161.002-9 - Automatic fire detecting system, power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Automatic fire detecting system, power supply. 161.002-9 Section 161.002-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT...-9 Automatic fire detecting system, power supply. The power supply for an automatic fire detecting...

  5. Multiloop Rapid-Rise/Rapid Fall High-Voltage Power Supply

    NASA Technical Reports Server (NTRS)

    Bearden, Douglas

    2007-01-01

    A proposed multiloop power supply would generate a potential as high as 1.25 kV with rise and fall times <100 s. This power supply would, moreover, be programmable to generate output potentials from 20 to 1,250 V and would be capable of supplying a current of at least 300 A at 1,250 V. This power supply is intended to be a means of electronic shuttering of a microchannel plate that would be used to intensify the output of a charge-coupled-device imager to obtain exposure times as short as 1 ms. The basic design of this power supply could also be adapted to other applications in which high voltages and high slew rates are needed. At the time of reporting the information for this article, there was no commercially available power supply capable of satisfying the stated combination of voltage, rise-time, and fall-time requirements. The power supply would include a preregulator that would be used to program a voltage 1/30 of the desired output voltage. By means of a circuit that would include a pulse-width modulator (PWM), two voltage doublers, and a transformer having two primary and two secondary windings, the preregulator output voltage would be amplified by a factor of 30. A resistor would limit the current by controlling a drive voltage applied to field-effect transistors (FETs) during turn-on of the PWM. Two feedback loops would be used to regulate the high output voltage. A pulse transformer would be used to turn on four FETs to short-circuit output capacitors when the outputs of the PWM were disabled. Application of a 0-to-5-V square to a PWM shut-down pin would cause a 20-to-1,250-V square wave to appear at the output.

  6. Switching power supply

    DOEpatents

    Mihalka, A.M.

    1984-06-05

    The invention is a repratable capacitor charging, switching power supply. A ferrite transformer steps up a dc input. The transformer primary is in a full bridge configuration utilizing power MOSFETs as the bridge switches. The transformer secondary is fed into a high voltage, full wave rectifier whose output is connected directly to the energy storage capacitor. The transformer is designed to provide adequate leakage inductance to limit capacitor current. The MOSFETs are switched to the variable frequency from 20 to 50 kHz to charge a capacitor from 0.6 kV. The peak current in a transformer primary and secondary is controlled by increasing the pulse width as the capacitor charges. A digital ripple counter counts pulses and after a preselected desired number is reached an up-counter is clocked.

  7. Essays in market power mitigation and supply function equilibrium

    NASA Astrophysics Data System (ADS)

    Subramainam, Thiagarajah Natchie

    Market power mitigation has been an integral part of wholesale electricity markets since deregulation. In wholesale electricity markets, different regions in the US take different approaches to regulating market power. While the exercise of market power has received considerable attention in the literature, the issue of market power mitigation has attracted scant attention. In the first chapter, I examine the market power mitigation rules used in New York ISO (Independent System Operator) and California ISO (CAISO) with respect to day-ahead and real-time energy markets. I test whether markups associated with New York in-city generators would be lower with an alternative approach to mitigation, the CAISO approach. Results indicate the difference in markups between these two mitigation rules is driven by the shape of residual demand curves for suppliers. Analysis of residual demand curves faced by New York in-city suppliers show similar markups under both mitigation rules when no one supplier is necessary to meet the demand (i.e., when no supplier is pivotal). However, when some supplier is crucial for the market to clear, the mitigation rule adopted by the NYISO consistently leads to higher markups than would the CAISO rule. This result suggest that market power episodes in New York is confined to periods where some supplier is pivotal. As a result, I find that applying the CAISOs' mitigation rules to the New York market could lower wholesale electricity prices by 18%. The second chapter of my dissertation focuses on supply function equilibrium. In power markets, suppliers submit offer curves in auctions, indicating their willingness to supply at different price levels. Although firms are allowed to submit different offer curves for different time periods, surprisingly many firms stick to a single offer curve for the entire day. This essentially means that firms are submitting a single offer curve for multiple demand realizations. A suitable framework to analyze

  8. Design and operating experience of a 40 MW, highly-stabilized power supply

    NASA Astrophysics Data System (ADS)

    Boenig, Heinrich J.; Ferner, James A.; Bogdan, Ferenc; Morris, Gary C.; Rumrill, Ron S.

    Four 10 MW, highly-stabilized power supply modules have been installed at the National High Magnetic Field Laboratory in Tallahassee, FL, to energize water-cooled, resistive, high-field research magnets. The power supply modules achieve a long term current stability if 10 ppM over a 12 h period with a short term ripple and noise variation of less than 10 ppM over a time period of one cycle. The power supply modules can operate independently, feeding four separate magnets, or two, three or four modules can operate in parallel. Each power supply module consists of a 12.5 kV vacuum circuit breaker, two three-winding, step-down transformers, a 24-pulse rectifier with interphase reactors, and a passive and an active filter. Two different transformer tap settings allow rated dc supply output voltages of 400 and 500 V. The rated current of a supply module is 17 kA and each supply module has a one-hour overload capability of 20 kA. The isolated output terminals of each power supply module are connected to a reversing switch. An extensive high-current bus system allows the modules to be connected to 16 magnet cells. This paper presents the detailed design of the power supply components. Various test results taken during the commissioning phase with a 10 MW resistive load and results taken with the research magnets are shown. The effects of the modules on the electrical supply system and the operational behavior of the power factor correction/harmonic filters are described. Included also are results of a power supply module feeding a superconducting magnet during quench propagation tests. Problems with the power supply design and solutions are presented. Some suggestions on how to improve the performance of these supplies are outlined.

  9. Arc lamp power supply using a voltage multiplier

    NASA Technical Reports Server (NTRS)

    Leighty, Bradley D.

    1988-01-01

    A power supply is provided for an arc discharge lamp which includes a relatively low voltage high current power supply section and a high voltage starter circuit. The low voltage section includes a transformer, rectifier, variable resistor and a bank of capacitors, while the starter circuit comprises several diodes and capacitors connected as a Cockcroft-Walton multiplier. The starting circuit is effectively bypassed when the lamp arc is established and serves to automatically provide a high starting voltage to re-strike the lamp arc if the arc is extinguished by a power interruption.

  10. Design of a 500 MJ, 5 MA power supply

    NASA Astrophysics Data System (ADS)

    Pappas, J. A.; Headifen, G. R.; Weldon, J. M.; Wright, J. C.; Zowarka, R. C.; Aanstoos, T. A.; Kajs, J. H.

    1993-01-01

    The design of a 500 MJ, 5 MA power supply for rail gun experiments under the Battery Upgraded Supply (BUS) program is examined. About 50,000 12-volt lead acid batteries are required to reach this level. BUS will be required to perform up to two discharges per week. Therefore, BUS is designed to be a low-maintenance, reliable, and fault-tolerant power supply. The design of BUS and the details of its subsystems are described.

  11. Transforming PC Power Supplies into Smart Car Battery Conditioners

    ERIC Educational Resources Information Center

    Rodriguez-Ascariz, J. M.; Boquete-Vazquez, L.

    2011-01-01

    This paper describes a laboratory project consisting of a PC power supply modification into an intelligent car-battery conditioner with both wireless and wired networking capabilities. Adding a microcontroller to an average PC power supply transforms it into a flexible, intelligent device that can be configured and that is suitable to keep car…

  12. Load controller and method to enhance effective capacity of a photovoltaic power supply

    DOEpatents

    Perez, Richard

    2000-01-01

    A load controller and method are provided for maximizing effective capacity of a non-controllable, renewable power supply coupled to a variable electrical load also coupled to a conventional power grid. Effective capacity is enhanced by monitoring power output of the renewable supply and loading, and comparing the loading against the power output and a load adjustment threshold determined from an expected peak loading. A value for a load adjustment parameter is calculated by subtracting the renewable supply output and the load adjustment parameter from the current load. This value is then employed to control the variable load in an amount proportional to the value of the load control parameter when the parameter is within a predefined range. By so controlling the load, the effective capacity of the non-controllable, renewable power supply is increased without any attempt at operational feedback control of the renewable supply. The renewable supply may comprise, for example, a photovoltaic power supply or a wind-based power supply.

  13. A SWOT Analysis of the Various Backup Scenarios Used in Electronic Medical Record Systems.

    PubMed

    Seo, Hwa Jeong; Kim, Hye Hyeon; Kim, Ju Han

    2011-09-01

    Electronic medical records (EMRs) are increasingly being used by health care services. Currently, if an EMR shutdown occurs, even for a moment, patient safety and care can be seriously impacted. Our goal was to determine the methodology needed to develop an effective and reliable EMR backup system. Our "independent backup system by medical organizations" paradigm implies that individual medical organizations develop their own EMR backup systems within their organizations. A "personal independent backup system" is defined as an individual privately managing his/her own medical records, whereas in a "central backup system by the government" the government controls all the data. A "central backup system by private enterprises" implies that individual companies retain control over their own data. A "cooperative backup system among medical organizations" refers to a networked system established through mutual agreement. The "backup system based on mutual trust between an individual and an organization" means that the medical information backup system at the organizational level is established through mutual trust. Through the use of SWOT analysis it can be shown that cooperative backup among medical organizations is possible to be established through a network composed of various medical agencies and that it can be managed systematically. An owner of medical information only grants data access to the specific person who gave the authorization for backup based on the mutual trust between an individual and an organization. By employing SWOT analysis, we concluded that a linkage among medical organizations or between an individual and an organization can provide an efficient backup system.

  14. A SWOT Analysis of the Various Backup Scenarios Used in Electronic Medical Record Systems

    PubMed Central

    Seo, Hwa Jeong; Kim, Hye Hyeon

    2011-01-01

    Objectives Electronic medical records (EMRs) are increasingly being used by health care services. Currently, if an EMR shutdown occurs, even for a moment, patient safety and care can be seriously impacted. Our goal was to determine the methodology needed to develop an effective and reliable EMR backup system. Methods Our "independent backup system by medical organizations" paradigm implies that individual medical organizations develop their own EMR backup systems within their organizations. A "personal independent backup system" is defined as an individual privately managing his/her own medical records, whereas in a "central backup system by the government" the government controls all the data. A "central backup system by private enterprises" implies that individual companies retain control over their own data. A "cooperative backup system among medical organizations" refers to a networked system established through mutual agreement. The "backup system based on mutual trust between an individual and an organization" means that the medical information backup system at the organizational level is established through mutual trust. Results Through the use of SWOT analysis it can be shown that cooperative backup among medical organizations is possible to be established through a network composed of various medical agencies and that it can be managed systematically. An owner of medical information only grants data access to the specific person who gave the authorization for backup based on the mutual trust between an individual and an organization. Conclusions By employing SWOT analysis, we concluded that a linkage among medical organizations or between an individual and an organization can provide an efficient backup system. PMID:22084811

  15. Combined heat and power supply using Carnot engines

    NASA Astrophysics Data System (ADS)

    Horlock, J. H.

    The Marshall Report on the thermodynamic and economic feasibility of introducing large scale combined heat and electrical power generation (CHP) into the United Kingdom is summarized. Combinations of reversible power plant (Carnot engines) to meet a given demand of power and heat production are analyzed. The Marshall Report states that fairly large scale CHP plants are an attractive energy saving option for areas of high heat load densities. Analysis shows that for given requirements, the total heat supply and utilization factor are functions of heat output, reservoir supply temperature, temperature of heat rejected to the reservoir, and an intermediate temperature for district heating.

  16. 7 CFR 1710.202 - Requirement to prepare a load forecast-power supply borrowers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Requirement to prepare a load forecast-power supply...—power supply borrowers. (a) A power supply borrower with a total utility plant of $500 million or more... be prepared pursuant to the approved load forecast work plan. (b) A power supply borrower that is a...

  17. DC-to-DC power supply for light aircraft flight testing

    NASA Technical Reports Server (NTRS)

    Yost, S. R.

    1980-01-01

    The power supply unit was developed to serve as the power source for a loran-C receiver. The power supply can be connected directly to the aircraft's electrical system, and is compatible with either 14 or 28 volt electrical systems. Design specifications are presented for the unit along with a description of the circuit design.

  18. Power supply circuit for an ion engine sequentially operated power inverters

    NASA Technical Reports Server (NTRS)

    Cardwell, Jr., Gilbert I. (Inventor)

    2000-01-01

    A power supply circuit for an ion engine suitable for a spacecraft has a voltage bus having input line and a return line. The power supply circuit includes a pulse width modulation circuit. A plurality of bridge inverter circuits is coupled to the bus and the pulse width modulation circuit. The pulse width modulation circuit generates operating signals having a variable duty cycle. Each bridge inverter has a primary winding and a secondary winding. Each secondary winding is coupled to a rectifier bridge. Each secondary winding is coupled in series with another of the plurality of rectifier bridges.

  19. 30 CFR 75.1101-9 - Back-up water system.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Back-up water system. 75.1101-9 Section 75.1101-9 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-9 Back-up water system...

  20. 30 CFR 75.1101-9 - Back-up water system.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Back-up water system. 75.1101-9 Section 75.1101-9 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-9 Back-up water system...

  1. 30 CFR 75.1101-9 - Back-up water system.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Back-up water system. 75.1101-9 Section 75.1101-9 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-9 Back-up water system...

  2. 30 CFR 75.1101-9 - Back-up water system.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Back-up water system. 75.1101-9 Section 75.1101-9 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-9 Back-up water system...

  3. 30 CFR 75.1101-9 - Back-up water system.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Back-up water system. 75.1101-9 Section 75.1101-9 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-9 Back-up water system...

  4. NASA Ames Research Center 60 MW Power Supply Modernization

    NASA Technical Reports Server (NTRS)

    Choy, Yuen Ching; Ilinets, Boris V.; Miller, Ted; Nagel, Kirsten (Technical Monitor)

    2001-01-01

    The NASA Ames Research Center 60 MW DC Power Supply was built in 1974 to provide controlled DC power for the Thermophysics Facility Arc Jet Laboratory. The Power Supply has gradually losing reliability due to outdated technology and component life limitation. NASA has decided to upgrade the existing rectifier modules with contemporary high-power electronics and control equipment. NASA plans to complete this project in 2001. This project includes a complete replacement of obsolete thyristor stacks in all six rectifier modules and rectifier bridge control system. High power water-cooled thyristors and freewheeling diodes will be used. The rating of each of the six modules will be 4000 A at 5500 V. The control firing angle signal will be sent from the Facility Control System to six modules via fiberoptic cable. The Power Supply control and monitoring system will include a Master PLC in the Facility building and a Slave PLC in each rectifier module. This system will also monitor each thyristor level in each stack and the auxiliary equipment.

  5. STS-47 crew and backups at MSFC's Payload Crew Training Complex

    NASA Technical Reports Server (NTRS)

    1992-01-01

    STS-47 Endeavour, Orbiter Vehicle (OV) 105, Spacelab Japan (SLJ) crewmembers and backup payload specialists stand outside SLJ module mockup at the Payload Crew Training Complex at Marshall SpaceFlight Center (MSFC) in Huntsville, Alabama. From left to right are Payload Specialist Mamoru Mohri, backup Payload Specialist Takao Doi, backup Payload Specialist Chiaki Naito-Mukai, Mission Specialist (MS) Mae C. Jemison, MS N. Jan Davis, backup Payload Specialist Stan Koszelak, and MS and Payload Commander (PLC) Mark C. Lee. The MSFC-managed mission is a joint venture in space-based research between the United States and Japan. Mohri, Doi, and Mukai represent Japan's National Space Development Agency (NASDA). View provided with alternate number 92P-142.

  6. Enhanced networked server management with random remote backups

    NASA Astrophysics Data System (ADS)

    Kim, Song-Kyoo

    2003-08-01

    In this paper, the model is focused on available server management in network environments. The (remote) backup servers are hooked up by VPN (Virtual Private Network) and replace broken main severs immediately. A virtual private network (VPN) is a way to use a public network infrastructure and hooks up long-distance servers within a single network infrastructure. The servers can be represent as "machines" and then the system deals with main unreliable and random auxiliary spare (remote backup) machines. When the system performs a mandatory routine maintenance, auxiliary machines are being used for backups during idle periods. Unlike other existing models, the availability of auxiliary machines is changed for each activation in this enhanced model. Analytically tractable results are obtained by using several mathematical techniques and the results are demonstrated in the framework of optimized networked server allocation problems.

  7. STS-9 payload specialists and backup in training session

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Two Spacelab 1 payload specialists and a backup for that flight prepare for a training session in the JSC mockup and integration laboratory. Fully decked out in the Shuttle constant wear garments (foreground) are Ulf Merbold, left, and Byron K. Licktenberg, prime crewmembers on the STS-9 team. In civilian clothes is payload specialist backup Michael L. Lampton.

  8. Design and Implement of Low Ripple and Quasi-digital Power Supply

    NASA Astrophysics Data System (ADS)

    Xiangli, Li; Yanjun, Wei; Hanhong, Qi; Yan, Ma

    A switch linearity hybrid power supply based on single chip microcomputer is designed which merged the merits of the switching and linear power supply. Main circuit includes pre-regulator which works in switching mode and series regulator which works in linear mode. Two-stage regulation mode was adopted in the main circuit of the power. A single chip computer (SCM) and high resolution of series D/A and A/D converters are applied to control and measurement which achieved continuous adjustable and low ripple constant current or voltage power supply

  9. A new digital pulse power supply in heavy ion research facility in Lanzhou

    NASA Astrophysics Data System (ADS)

    Wang, Rongkun; Chen, Youxin; Huang, Yuzhen; Gao, Daqing; Zhou, Zhongzu; Yan, Huaihai; Zhao, Jiang; Shi, Chunfeng; Wu, Fengjun; Yan, Hongbin; Xia, Jiawen; Yuan, Youjin

    2013-11-01

    To meet the increasing requirements of the Heavy Ion Research Facility in Lanzhou-Cooler Storage Ring (HIRFL-CSR), a new digital pulse power supply, which employs multi-level converter, was designed. This power supply was applied with a multi H-bridge converters series-parallel connection topology. A new control model named digital power supply regulator system (DPSRS) was proposed, and a pulse power supply prototype based on DPSRS has been built and tested. The experimental results indicate that tracking error and ripple current meet the requirements of this design. The achievement of prototype provides a perfect model for HIRFL-CSR power supply system.

  10. 77 FR 48177 - Fuel Oil Systems for Emergency Power Supplies

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0159] Fuel Oil Systems for Emergency Power Supplies AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; extension of comment period. SUMMARY: On... Regulatory Guide, DG- 1282, ``Fuel Oil Systems for Emergency Power Supplies,'' in the Federal Register for a...

  11. 49 CFR 393.23 - Power supply for lamps.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.23 Power supply for lamps. All required lamps must be powered by the electrical system of the motor vehicle with the...

  12. 46 CFR 113.10-9 - Power supply.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Power supply. 113.10-9 Section 113.10-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM.... There must be at least two sources of power for the electrical equipment of each fire detecting and...

  13. 46 CFR 113.10-9 - Power supply.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Power supply. 113.10-9 Section 113.10-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM.... There must be at least two sources of power for the electrical equipment of each fire detecting and...

  14. 46 CFR 113.10-9 - Power supply.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Power supply. 113.10-9 Section 113.10-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM.... There must be at least two sources of power for the electrical equipment of each fire detecting and...

  15. Alternative power supply systems for remote industrial customers

    NASA Astrophysics Data System (ADS)

    Kharlamova, N. V.; Khalyasmaa, A. I.; Eroshenko, S. A.

    2017-06-01

    The paper addresses the problem of alternative power supply of remote industrial clusters with renewable electric energy generation. As a result of different technologies comparison, consideration is given to wind energy application. The authors present a methodology of mean expected wind generation output calculation, based on Weibull distribution, which provides an effective express-tool for preliminary assessment of required installed generation capacity. The case study is based on real data including database of meteorological information, relief characteristics, power system topology etc. Wind generation feasibility estimation for a specific territory is followed by power flow calculations using Monte Carlo methodology. Finally, the paper provides a set of recommendations to ensure safe and reliable power supply for the final customers and, subsequently, to provide sustainable development of the regions, located far from megalopolises and industrial centres.

  16. Influence of unbalance levels on nonlinear dynamics of a rotor-backup rolling bearing system

    NASA Astrophysics Data System (ADS)

    Fonseca, Cesar A.; Santos, Ilmar F.; Weber, Hans I.

    2017-04-01

    Rotor drops in magnetic bearing and unbalance in rotors have been objective of study for many years. The combination of these two well-known phenomena led to an interesting chaotic response, when the rotor touches the inner race of the back-up bearing. The present work explores the nonlinear rotor backup bearing dynamics both theoretically and experimentally using a fully instrumented test rig, where the position of shaft, its angular velocity and the contact forces between the shaft and the backup bearing are sampled at 25 kHz. The test rig is built by a removable passive magnetic bearing, which allows for simulation of magnetic bearing failure (loss of carrying capacity and rotor fall). The rotor is studied numerically as well as experimentally. A theoretical approach is given beforehand and supplies the basis of the study. Finally the presented results are commented on the point of view of nonlinear dynamics applied to the practical use. The theoretical and numerical analyses are shown through orbit plots, phase plans, Poincaré maps, force response in time and double sided spectrum. The latter is important to characterize the condition at different levels of unbalance between forward and backward whirl. Our preliminary results indicate that for smaller amount of unbalance the rotor swings at the bottom of the bearing, the more the unbalance increases, other dynamical behavior occur and some can be extremely harmful, since the rotor can be lifted from the contact state and return, starting to impact innumerable times without reaching a steady state.

  17. Noise propagation effects in power supply distribution systems for high-energy physics experiments

    NASA Astrophysics Data System (ADS)

    Arteche, F.; Rivetta, C.; Iglesias, M.; Echeverria, I.; Pradas, A.; Arcega, F. J.

    2017-12-01

    High-energy physics experiments are supplied by thousands of power supply units placed in distant areas from the front-end electronics. The power supply units and the front-end electronics are connected through long power cables that propagate the output noise from the power supplies to the detector. This paper addresses the effect of long cables on the noise propagation and the impact that those cables have on the conducted emission levels required for the power supplies and the selection of EMI filters for the front-end electronic low-voltage input. This analysis is part of the electromagnetic compatibility based design focused on functional safety to define the type of cable, shield connections, EMI filters and power supply specifications required to ensure the successful integration of the detector and, specifically, to achieve the designed performance of the front-end electronics.

  18. Optimal Design of Magnetic ComponentsinPlasma Cutting Power Supply

    NASA Astrophysics Data System (ADS)

    Jiang, J. F.; Zhu, B. R.; Zhao, W. N.; Yang, X. J.; Tang, H. J.

    2017-10-01

    Phase-shifted transformer and DC reactor are usually needed in chopper plasma cutting power supply. Because of high power rate, the loss of magnetic components may reach to several kilowatts, which seriously affects the conversion efficiency. Therefore, it is necessary to research and design low loss magnetic components by means of efficient magnetic materials and optimal design methods. The main task in this paper is to compare the core loss of different magnetic material, to analyze the influence of transformer structure, winding arrangement and wire structure on the characteristics of magnetic component. Then another task is to select suitable magnetic material, structure and wire in order to reduce the loss and volume of magnetic components. Based on the above outcome, the optimization design process of transformer and dc reactor are proposed in chopper plasma cutting power supply with a lot of solutions. These solutions are analyzed and compared before the determination of the optimal solution in order to reduce the volume and power loss of the two magnetic components and improve the conversion efficiency of plasma cutting power supply.

  19. Power supply system for the superconducting outsert of the CHMFL hybrid magnet

    NASA Astrophysics Data System (ADS)

    Fang, Z.; Zhu, J.; Chen, W.; Jiang, D.; Huang, P.; Chen, Z.; Tan, Y.; Kuang, G.

    2017-12-01

    The construction of a new hybrid magnet, consisting of a 11 T superconducting outsert and a 34 T resistive insert magnet, has been finished at the Chinese High Magnetic Field Laboratory (CHMFL) in Hefei. With a room temperature bore of 800 mm in diameter, the hybrid magnet superconducting outsert is composed of four separate Nb3Sn-based Cable-in-Conduit Conductor (CICC) coils electrically connected in series and powered by a single power supply system. The power supply system for the superconducting outsert consists of a 16 kA DC power supply, a quench protection system, a pair of 16 kA High Temperature Superconducting (HTS) current leads, and two Low Temperature Superconducting bus-lines. The design and manufacturing of the power supply system have been completed at the CHMFL. This paper describes the design features of the power supply system as well as the current fabrication condition of its main components.

  20. High voltage power supply

    NASA Technical Reports Server (NTRS)

    Ruitberg, A. P.; Young, K. M. (Inventor)

    1985-01-01

    A high voltage power supply is formed by three discrete circuits energized by a battery to provide a plurality of concurrent output signals floating at a high output voltage on the order of several tens of kilovolts. In the first two circuits, the regulator stages are pulse width modulated and include adjustable ressistances for varying the duty cycles of pulse trains provided to corresponding oscillator stages while the third regulator stage includes an adjustable resistance for varying the amplitude of a steady signal provided to a third oscillator stage. In the first circuit, the oscillator, formed by a constant current drive network and a tuned resonant network included a step up transformer, is coupled to a second step up transformer which, in turn, supplies an amplified sinusoidal signal to a parallel pair of complementary poled rectifying, voltage multiplier stages to generate the high output voltage.

  1. Ultracapacitor-Based Uninterrupted Power Supply System

    NASA Technical Reports Server (NTRS)

    Eichenberg, Dennis J.

    2011-01-01

    The ultracapacitor-based uninterrupted power supply (UPS) system enhances system reliability; reduces life-of-system, maintenance, and downtime costs; and greatly reduces environmental impact when compared to conventional UPS energy storage systems. This design provides power when required and absorbs power when required to smooth the system load and also has excellent low-temperature performance. The UPS used during hardware tests at Glenn is an efficient, compact, maintenance-free, rack-mount, pure sine-wave inverter unit. The UPS provides a continuous output power up to 1,700 W with a surge rating of 1,870 W for up to one minute at a nominal output voltage of 115 VAC. The ultracapacitor energy storage system tested in conjunction with the UPS is rated at 5.8 F. This is a bank of ten symmetric ultracapacitor modules. Each module is actively balanced using a linear voltage balancing technique in which the cell-to-cell leakage is dependent upon the imbalance of the individual cells. The ultracapacitors are charged by a DC power supply, which can provide up to 300 VDC at 4 A. A constant-voltage, constant-current power supply was selected for this application. The long life of ultracapacitors greatly enhances system reliability, which is significant in critical applications such as medical power systems and space power systems. The energy storage system can usually last longer than the application, given its 20-year life span. This means that the ultracapacitors will probably never need to be replaced and disposed of, whereas batteries require frequent replacement and disposal. The charge-discharge efficiency of rechargeable batteries is approximately 50 percent, and after some hundreds of charges and discharges, they must be replaced. The charge-discharge efficiency of ultracapacitors exceeds 90 percent, and can accept more than a million charges and discharges. Thus, there is a significant energy savings through the efficiency improvement, and there is far less

  2. Noise propagation effects in power supply distribution systems for high-energy physics experiments

    DOE PAGES

    Arteche, F.; Rivetta, C.; Iglesias, M.; ...

    2017-12-05

    High-energy physics experiments are supplied by thousands of power supply units placed in distant areas from the front-end electronics. The power supply units and the front-end electronics are connected through long power cables that propagate the output noise from the power supplies to the detector. Here, this paper addresses the effect of long cables on the noise propagation and the impact that those cables have on the conducted emission levels required for the power supplies and the selection of EMI filters for the front-end electronic low-voltage input. Lastly, this analysis is part of the electromagnetic compatibility based design focused onmore » functional safety to define the type of cable, shield connections, EMI filters and power supply specifications required to ensure the successful integration of the detector and, specifically, to achieve the designed performance of the front-end electronics.« less

  3. Noise propagation effects in power supply distribution systems for high-energy physics experiments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arteche, F.; Rivetta, C.; Iglesias, M.

    High-energy physics experiments are supplied by thousands of power supply units placed in distant areas from the front-end electronics. The power supply units and the front-end electronics are connected through long power cables that propagate the output noise from the power supplies to the detector. Here, this paper addresses the effect of long cables on the noise propagation and the impact that those cables have on the conducted emission levels required for the power supplies and the selection of EMI filters for the front-end electronic low-voltage input. Lastly, this analysis is part of the electromagnetic compatibility based design focused onmore » functional safety to define the type of cable, shield connections, EMI filters and power supply specifications required to ensure the successful integration of the detector and, specifically, to achieve the designed performance of the front-end electronics.« less

  4. Layouts of trigeneration plants for centralized power supply

    NASA Astrophysics Data System (ADS)

    Klimenko, A. V.; Agababov, V. S.; Il'ina, I. P.; Rozhnatovskii, V. D.; Burmakina, A. V.

    2016-06-01

    One of the possible and, under certain conditions, sufficiently effective methods for reducing consumption of fuel and energy resources is the development of plants for combined generation of different kinds of energy. In the power industry of Russia, the facilities have become widespread in which the cogeneration technology, i.e., simultaneous generation of electric energy and heat, is implemented. Such facilities can use different plants, viz., gas- and steam-turbine plants and gas-reciprocating units. Cogeneration power supply can be further developed by simultaneously supplying the users not only with electricity and heat but also with cold. Such a technology is referred to as trigeneration. To produce electricity and heat, trigeneration plants can use the same facilities that are used in cogeneration, namely, gas-turbine plants, steam-turbine plants, and gas-reciprocating units. Cold can be produced in trigeneration plants using thermotransformers of various kinds, such as vaporcompression thermotransformers, air thermotransformers, and absorption thermotransformers, that operate as chilling machines. The thermotransformers can also be used in the trigeneration plants to generate heat. The main advantage of trigeneration plants based on gas-turbine plants or gas-reciprocating units over cogeneration plants is the increased thermodynamic power supply efficiency owing to utilization of the waste-gas heat not only in winter but also in summer. In the steam-turbine-based trigeneration plants equipped with absorption thermotransformers, the enhancement of the thermodynamic power supply efficiency is determined by the increase in the heat extraction load during the nonheating season. The article presents calculated results that demonstrate higher thermodynamic efficiency of a gas-turbine-based plant with an absorption thermotransformer that operates in the trigeneration mode compared with a cogeneration gas-turbine plant. The structural arrangements of trigeneration

  5. Fault-tolerant back-up archive using an ASP model for disaster recovery

    NASA Astrophysics Data System (ADS)

    Liu, Brent J.; Huang, H. K.; Cao, Fei; Documet, Luis; Sarti, Dennis A.

    2002-05-01

    A single point of failure in PACS during a disaster scenario is the main archive storage and server. When a major disaster occurs, it is possible to lose an entire hospital's PACS data. Few current PACS archives feature disaster recovery, but the design is limited at best. These drawbacks include the frequency with which the back-up is physically removed to an offsite facility, the operational costs associated to maintain the back-up, the ease-of-use to perform the backup consistently and efficiently, and the ease-of-use to perform the PACS image data recovery. This paper describes a novel approach towards a fault-tolerant solution for disaster recovery of short-term PACS image data using an Application Service Provider model for service. The ASP back-up archive provides instantaneous, automatic backup of acquired PACS image data and instantaneous recovery of stored PACS image data all at a low operational cost. A back-up archive server and RAID storage device is implemented offsite from the main PACS archive location. In the example of this particular hospital, it was determined that at least 2 months worth of PACS image exams were needed for back-up. Clinical data from a hospital PACS is sent to this ASP storage server in parallel to the exams being archived in the main server. A disaster scenario was simulated and the PACS exams were sent from the offsite ASP storage server back to the hospital PACS. Initially, connectivity between the main archive and the ASP storage server is established via a T-1 connection. In the future, other more cost-effective means of connectivity will be researched such as the Internet 2. A disaster scenario was initiated and the disaster recovery process using the ASP back-up archive server was success in repopulating the clinical PACS within a short period of time. The ASP back-up archive was able to recover two months of PACS image data for comparison studies with no complex operational procedures. Furthermore, no image data loss

  6. DBD tranformerless power supplies: impact of the parasitic capacitances on the power transfer.

    NASA Astrophysics Data System (ADS)

    Diop, M. A.; Belinger, A.; Piquet, H.

    2017-04-01

    A new transformerless power supply for DBD application is presented here. The power supply is built with 10kV SiC MOSFET. This high voltage switches allow holding the high voltage required by the DBD. An analytical study of the converter’s operation is presented to deduce the power transmitted to the DBD. A comparison between the experimental and theoretical electrical waveforms is shown. The experimental waveforms are particularly affected by all the parasitic capacitances. When all the switches are in OFF state, oscillations cause over-voltages across the switches. An analysis of the effect of each capacitance is presented and demonstrates that the parasitic capacitances of the switches and of the inductance play a key role in the actual power transfer.

  7. Reducing Backups by Utilizing DMF

    NASA Technical Reports Server (NTRS)

    Cardo, Nicholas P.; Woodrow, Thomas (Technical Monitor)

    1994-01-01

    Although a filesystem may be migratable, for a period of time the data blocks are on disk only. When performing system dumps, these data blocks are backed up to tape. If the data blocks are offline or dual resident, then only the inode is backed up. If all online files are made dual resident prior to performing system dumps, the dump time and the amount of resources required can be significantly reduced. The High Speed Processors group at the Numerical Aerodynamics Simulation (NAS) Facility at NASA Ames Research Center developed a tool to make all online files dual resident. The result is that a file whose data blocks are on DMF tape and still assigned to the original inode. Our 150GB filesystem used to take 8 to 12 hours to backup and used 50 to 60 tapes. Now the backup is typically under 10 tapes and completes in under 2 hours. This paper discusses this new tool and advantages gained by using it.

  8. Development of a heavy duty portable variable power supply (HPVPS)

    NASA Astrophysics Data System (ADS)

    Musa, Ahmad Zulfadli Bin; Lung, Chong Man; Abidin, Wan'Amirah Basyarah Binti Zainol

    2017-08-01

    This paper covers the innovation of a Heavy Duty Portable Variable Power Supply (HPVPS) in Jabatan Kejuruteraan Elektrik (JKE), Politeknik Mukah, Sarawak (PMU). This project consists of variable power supply which can vary the output from 1.2 V to 11.6V, AC pure wave inverter to convert DC to AC for the operation of low power home appliances and also used Li-on rechargeable batteries to store the electrical energy and additional feature that can be used to jump-start the batteries of the car. The main objective of this project is to make the user can operate the electronic devices anywhere whenever if no electricity while doing their lab activities. Most of the regulated power supply in JKE lab aged 9-10 years old and need periodical maintenance and need cost and also the unit can be used is not enough to support the whole class during lab activities. As a result, the P&P process will be facing the major problem in order to make the lab activities running smoothly. By development of the portable variable power supply, the P&P process is more efficient and very helpful.

  9. Power supply system for negative ion source at IPR

    NASA Astrophysics Data System (ADS)

    Gahlaut, Agrajit; Sonara, Jashwant; Parmar, K. G.; Soni, Jignesh; Bandyopadhyay, M.; Singh, Mahendrajit; Bansal, Gourab; Pandya, Kaushal; Chakraborty, Arun

    2010-02-01

    The first step in the Indian program on negative ion beams is the setting up of Negative ion Experimental Assembly - RF based, where 100 kW of RF power shall be coupled to a plasma source producing plasma of density ~5 × 1012 cm-3, from which ~ 10 A of negative ion beam shall be produced and accelerated to 35 kV, through an electrostatic ion accelerator. The experimental system is modelled similar to the RF based negative ion source, BATMAN presently operating at IPP, Garching, Germany. The mechanical system for Negative Ion Source Assembly is close to the IPP source, remaining systems are designed and procured principally from indigenous sources, keeping the IPP configuration as a base line. High voltage (HV) and low voltage (LV) power supplies are two key constituents of the experimental setup. The HV power supplies for extraction and acceleration are rated for high voltage (~15 to 35kV), and high current (~ 15 to 35A). Other attributes are, fast rate of voltage rise (< 5ms), good regulation (< ±1%), low ripple (< ±2%), isolation (~50kV), low energy content (< 10J) and fast cut-off (< 100μs). The low voltage (LV) supplies required for biasing and providing heating power to the Cesium oven and the plasma grids; have attributes of low ripple, high stability, fast and precise regulation, programmability and remote operation. These power supplies are also equipped with over-voltage, over-current and current limit (CC Mode) protections. Fault diagnostics, to distinguish abnormal rise in currents (breakdown faults) with over-currents is enabled using fast response breakdown and over-current protection scheme. To restrict the fault energy deposited on the ion source, specially designed snubbers are implemented in each (extraction and acceleration) high voltage path to swap the surge energy. Moreover, the monitoring status and control signals from these power supplies are required to be electrically (~ 50kV) isolated from the system. The paper shall present the

  10. Thermal control evaluation of a Shuttle Orbiter solar observatory using Skylab ATM backup hardware

    NASA Technical Reports Server (NTRS)

    Class, C. R.; Presta, G.; Trucks, H.

    1975-01-01

    A study under the sponsorship of Marshall Space Flight Center (MSFC) established the feasibility to utilize the Skylab Apollo Telescope Mount (ATM) backup hardware for early low cost Shuttle Orbiter solar observation missions. A solar inertial attitude and a seven-day, full sun exposure were baselined. As a portion of the study, a series of thermal control evaluations were performed to resolve the problems caused by the relocation of the ATM to the Shuttle Orbiter bay and resulting configuration changes. Thermal control requirements, problems, the use of solar shields, Spacelab supplied fluid cooling and component placement are discussed.

  11. Electric Transport Traction Power Supply System With Distributed Energy Sources

    NASA Astrophysics Data System (ADS)

    Abramov, E. Y.; Schurov, N. I.; Rozhkova, M. V.

    2016-04-01

    The paper states the problem of traction substation (TSS) leveling of daily-load curve for urban electric transport. The circuit of traction power supply system (TPSS) with distributed autonomous energy source (AES) based on photovoltaic (PV) and energy storage (ES) units is submitted here. The distribution algorithm of power flow for the daily traction load curve leveling is also introduced in this paper. In addition, it illustrates the implemented experiment model of power supply system.

  12. Unity Power Factor Operated PFC Converter Based Power Supply for Computers

    NASA Astrophysics Data System (ADS)

    Singh, Shikha; Singh, Bhim; Bhuvaneswari, G.; Bist, Vashist

    2017-11-01

    Power Supplies (PSs) employed in personal computers pollute the single phase ac mains by drawing distorted current at a substandard Power Factor (PF). The harmonic distortion of the supply current in these personal computers are observed 75% to 90% with the Crest Factor (CF) being very high which escalates losses in the distribution system. To find a tangible solution to these issues, a non-isolated PFC converter is employed at the input of isolated converter that is capable of improving the input power quality apart from regulating the dc voltage at its output. This is given to the isolated stage that yields completely isolated and stiffly regulated multiple output voltages which is the prime requirement of computer PS. The operation of the proposed PS is evaluated under various operating conditions and the results show improved performance depicting nearly unity PF and low input current harmonics. The prototype of this PS is developed in laboratory environment and test results are recorded which corroborate the power quality improvement observed in simulation results under various operating conditions.

  13. Power supply with air core transformer and seperated power supplies for high dynamic range

    NASA Technical Reports Server (NTRS)

    Orient, Otto (Inventor); Chutjian, Ara (Inventor); Aalami, Dean (Inventor); Darrach, Murray (Inventor)

    2001-01-01

    A power supply for a quadrupole mass spectrometer which operates using an RF signal. The RF signal is controllable via a feedback loop. The feedback loop is from the output, through a comparator, and compared to a digital signal. An air core transformer is used to minimize the weight. The air core transformer is driven via two out of phase sawtooth signals which drive opposite ends of the transformer.

  14. Design of Intelligent Power Supply System for Expressway Tunnel

    NASA Astrophysics Data System (ADS)

    Wang, Li; Li, Yutong; Lin, Zimian

    2018-01-01

    Tunnel lighting program is one of the key points of tunnel infrastructure construction. As tunnels tend to handle remote locations, power supply line construction generally has been having the distance, investment, high cost characteristics. To solve this problem, we propose a green, environmentally friendly, energy-efficient lighting system. This program uses the piston-wind which cars within tunnel produce as the power and combines with solar energy, physical lighting to achieve it, which solves the problem of difficult and high cost of highway tunnel section, and provides new ideas for the future construction of tunnel power supply.

  15. 49 CFR 236.206 - Battery or power supply with respect to relay; location.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Battery or power supply with respect to relay..., AND APPLIANCES Automatic Block Signal Systems Standards § 236.206 Battery or power supply with respect to relay; location. The battery or power supply for each signal control relay circuit, where an open...

  16. 49 CFR 236.206 - Battery or power supply with respect to relay; location.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Battery or power supply with respect to relay..., AND APPLIANCES Automatic Block Signal Systems Standards § 236.206 Battery or power supply with respect to relay; location. The battery or power supply for each signal control relay circuit, where an open...

  17. 49 CFR 236.206 - Battery or power supply with respect to relay; location.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Battery or power supply with respect to relay..., AND APPLIANCES Automatic Block Signal Systems Standards § 236.206 Battery or power supply with respect to relay; location. The battery or power supply for each signal control relay circuit, where an open...

  18. 49 CFR 236.206 - Battery or power supply with respect to relay; location.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Battery or power supply with respect to relay..., AND APPLIANCES Automatic Block Signal Systems Standards § 236.206 Battery or power supply with respect to relay; location. The battery or power supply for each signal control relay circuit, where an open...

  19. 49 CFR 236.206 - Battery or power supply with respect to relay; location.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Battery or power supply with respect to relay..., AND APPLIANCES Automatic Block Signal Systems Standards § 236.206 Battery or power supply with respect to relay; location. The battery or power supply for each signal control relay circuit, where an open...

  20. Expert systems for space power supply - Design, analysis, and evaluation

    NASA Technical Reports Server (NTRS)

    Cooper, Ralph S.; Thomson, M. Kemer; Hoshor, Alan

    1987-01-01

    The feasibility of applying expert systems to the conceptual design, analysis, and evaluation of space power supplies in particular, and complex systems in general is evaluated. To do this, the space power supply design process and its associated knowledge base were analyzed and characterized in a form suitable for computer emulation of a human expert. The existing expert system tools and the results achieved with them were evaluated to assess their applicability to power system design. Some new concepts for combining program architectures (modular expert systems and algorithms) with information about the domain were applied to create a 'deep' system for handling the complex design problem. NOVICE, a code to solve a simplified version of a scoping study of a wide variety of power supply types for a broad range of missions, has been developed, programmed, and tested as a concrete feasibility demonstration.

  1. High Voltage Power Supply Design Guide for Space

    NASA Technical Reports Server (NTRS)

    Bever, Renate S.; Ruitberg, Arthur P.; Kellenbenz, Carl W.; Irish, Sandra M.

    2006-01-01

    This book is written for newcomers to the topic of high voltage (HV) in space and is intended to replace an earlier (1970s) out-of-print document. It discusses the designs, problems, and their solutions for HV, mostly direct current, electric power, or bias supplies that are needed for space scientific instruments and devices, including stepping supplies. Output voltages up to 30kV are considered, but only very low output currents, on the order of microamperes. The book gives a brief review of the basic physics of electrical insulation and breakdown problems, especially in gases. It recites details about embedment and coating of the supplies with polymeric resins. Suggestions on HV circuit parts follow. Corona or partial discharge testing on the HV parts and assemblies is discussed both under AC and DC impressed test voltages. Electric field analysis by computer on an HV device is included in considerable detail. Finally, there are many examples given of HV power supplies, complete with some of the circuit diagrams and color photographs of the layouts.

  2. Clinical experiences with an ASP model backup archive for PACS images

    NASA Astrophysics Data System (ADS)

    Liu, Brent J.; Cao, Fei; Documet, Luis; Huang, H. K.; Muldoon, Jean

    2003-05-01

    Last year we presented a Fault-Tolerant Backup Archive using an Application Service Provider (ASP) model for disaster recovery. The purpose of this paper is to update and provide clinical experiences related towards implementing the ASP model archive solution for short-term backup of clinical PACS image data as well as possible applications other than disaster recovery. The ASP backup archive provides instantaneous, automatic backup of acquired PACS image data and instantaneous recovery of stored PACS image data all at a low operational cost and with little human intervention. This solution can be used for a variety of scheduled and unscheduled downtimes that occur on the main PACS archive. A backup archive server with hierarchical storage was implemented offsite from the main PACS archive location. Clinical data from a hospital PACS is sent to this ASP storage server in parallel to the exams being archived in the main server. Initially, connectivity between the main archive and the ASP storage server is established via a T-1 connection. In the future, other more cost-effective means of connectivity will be researched such as the Internet 2. We have integrated the ASP model backup archive with a clinical PACS at Saint John's Health Center and has been operational for over 6 months. Pitfalls encountered during integration with a live clinical PACS and the impact to clinical workflow will be discussed. In addition, estimations of the cost of establishing such a solution as well as the cost charged to the users will be included. Clinical downtime scenarios, such as a scheduled mandatory downtime and an unscheduled downtime due to a disaster event to the main archive, were simulated and the PACS exams were sent successfully from the offsite ASP storage server back to the hospital PACS in less than 1 day. The ASP backup archive was able to recover PACS image data for comparison studies with no complex operational procedures. Furthermore, no image data loss was

  3. The Environment Friendly Power Source for Power Supply of Mobile Communication Base Stations

    NASA Astrophysics Data System (ADS)

    Rudenko, N. V.; Ershov, V. V.; Evstafiev, V. V.

    2017-05-01

    The article describes the technical proposals to improve environmental and resource characteristics of the autonomous power supply systems of mobile communication base stations based on renewable energy sources, while ensuring the required reliability and security of power supply. These include: the replacement of diesel-generator with clean energy source - an electrochemical generator based on hydrogen fuel cells; the use of wind turbines with a vertical axis; use of specialized batteries. Based on the analysis of the know technical solutions, the structural circuit diagram of the hybrid solar-wind-hydrogen power plant and the basic principles of the algorithm of its work were proposed. The implementation of these proposals will improve the environmental and resource characteristics.

  4. Researching, Evaluating, and Choosing a Backup Service in the Cloud

    ERIC Educational Resources Information Center

    Hastings, Robin

    2012-01-01

    Backups are a modern fact of life. Every organization that has any kind of computing technology (and that is all of them these days) needs to back up its data in case of technological or user errors. Traditionally, large-scale backups have been done via an internal or external tape drive that takes magnetic tapes (minicassettes, essentially) and…

  5. Analog neural network control method proposed for use in a backup satellite control mode

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frigo, J.R.; Tilden, M.W.

    1998-03-01

    The authors propose to use an analog neural network controller implemented in hardware, independent of the active control system, for use in a satellite backup control mode. The controller uses coarse sun sensor inputs. The field of view of the sensors activate the neural controller, creating an analog dead band with respect to the direction of the sun on each axis. This network controls the orientation of the vehicle toward the sunlight to ensure adequate power for the system. The attitude of the spacecraft is stabilized with respect to the ambient magnetic field on orbit. This paper develops a modelmore » of the controller using real-time coarse sun sensor data and a dynamic model of a prototype system based on a satellite system. The simulation results and the feasibility of this control method for use in a satellite backup control mode are discussed.« less

  6. A Total Cost of Ownership Model for Low Temperature PEM Fuel Cells in Combined Heat and Power and Backup Power Applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    University of California, Berkeley; Wei, Max; Lipman, Timothy

    2014-06-23

    A total cost of ownership model is described for low temperature proton exchange membrane stationary fuel cell systems for combined heat and power (CHP) applications from 1-250kW and backup power applications from 1-50kW. System designs and functional specifications for these two applications were developed across the range of system power levels. Bottom-up cost estimates were made for balance of plant costs, and detailed direct cost estimates for key fuel cell stack components were derived using design-for-manufacturing-and-assembly techniques. The development of high throughput, automated processes achieving high yield are projected to reduce the cost for fuel cell stacks to the $300/kWmore » level at an annual production volume of 100 MW. Several promising combinations of building types and geographical location in the U.S. were identified for installation of fuel cell CHP systems based on the LBNL modelling tool DER CAM. Life-cycle modelling and externality assessment were done for hotels and hospitals. Reduced electricity demand charges, heating credits and carbon credits can reduce the effective cost of electricity ($/kWhe) by 26-44percent in locations such as Minneapolis, where high carbon intensity electricity from the grid is displaces by a fuel cell system operating on reformate fuel. This project extends the scope of existing cost studies to include externalities and ancillary financial benefits and thus provides a more comprehensive picture of fuel cell system benefits, consistent with a policy and incentive environment that increasingly values these ancillary benefits. The project provides a critical, new modelling capacity and should aid a broad range of policy makers in assessing the integrated costs and benefits of fuel cell systems versus other distributed generation technologies.« less

  7. Development of a solar charged laboratory bench power supply

    NASA Astrophysics Data System (ADS)

    Ayara, W. A.; Omotosho, T. V.; Usikalu, M. R.; Singh, M. S. J.; Suparta, W.

    2017-05-01

    This product is an improvement on available DC laboratory bench power supply. It is capable of delivering low voltage Alternating Current (AC) and Direct Current (DC) to carry out basic laboratory experiment for both secondary schools and also at higher education institutions. The power supply is capable of delivering fixed DC voltages of 5V, 9V, 12V, variable voltage of between 1.25-30V and a 12V AC voltage. Also Incorporated is a USB port that allows for charging cell phones and other mobile devices, and a dedicated 12V DC output to power 5-7 Watt LED bulb to provide illumination in the laboratory for the instructor who may need to work at night in the absence of utility power.

  8. Gemini 7 backup crew seen in white room during Gemini 7 simulation activity

    NASA Image and Video Library

    1965-11-27

    S65-61837 (27 Nov. 1965) --- The Gemini-7 backup crew seen in the White Room atop Pad 19 during Gemini-7 simulation flight activity. McDonnell Aircraft Corporation technicians assist in the exercise. Astronaut Edward H. White II (in foreground) is the Gemini-7 backup crew command pilot; and astronaut Michael Collins (right background) is the backup crew pilot. Photo credit: NASA

  9. Protective and control relays as coal-mine power-supply ACS subsystem

    NASA Astrophysics Data System (ADS)

    Kostin, V. N.; Minakova, T. E.

    2017-10-01

    The paper presents instantaneous selective short-circuit protection for the cabling of the underground part of a coal mine and central control algorithms as a Coal-Mine Power-Supply ACS Subsystem. In order to improve the reliability of electricity supply and reduce the mining equipment down-time, a dual channel relay protection and central control system is proposed as a subsystem of the coal-mine power-supply automated control system (PS ACS).

  10. 76 FR 57897 - Energy Conservation Program: Energy Conservation Standards for Certain External Power Supplies

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-19

    ... Energy Conservation Program: Energy Conservation Standards for Certain External Power Supplies AGENCY... external power supplies used in specific applications from certain energy conservation standards prescribed... external power supplies used either in security or life safety alarms or surveillance system components...

  11. Power Supplies for High Energy Particle Accelerators

    NASA Astrophysics Data System (ADS)

    Dey, Pranab Kumar

    2016-06-01

    The on-going research and the development projects with Large Hadron Collider at CERN, Geneva, Switzerland has generated enormous enthusiasm and interest amongst all to know about the ultimate findings on `God's Particle'. This paper has made an attempt to unfold the power supply requirements and the methodology adopted to provide the stringent demand of such high energy particle accelerators during the initial stages of the search for the ultimate particles. An attempt has also been made to highlight the present status on the requirement of power supplies in some high energy accelerators with a view that, precautionary measures can be drawn during design and development from earlier experience which will be of help for the proposed third generation synchrotron to be installed in India at a huge cost.

  12. Precision control of high temperature furnaces using an auxiliary power supply and charged practice current flow

    DOEpatents

    Pollock, George G.

    1997-01-01

    Two power supplies are combined to control a furnace. A main power supply heats the furnace in the traditional manner, while the power from the auxiliary supply is introduced as a current flow through charged particles existing due to ionized gas or thermionic emission. The main power supply provides the bulk heating power and the auxiliary supply provides a precise and fast power source such that the precision of the total power delivered to the furnace is improved.

  13. Sprawling nursery unveils propane backup for natural gas boilers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-02-01

    First, take the most authoritative policy- making body in the pervasive problem area of Southern California air pollution (South Coast Air Quality Management District - SCAQMD). Then apply that organization's recently- enacted regulation prohibiting the use of diesel fuel in boilers to a well-known commercial establishment. The result is an alternative fuel story, that's too engaging to overlook. Monrovia Nursery, a 65-year-old, 500-acre wholesale growing facility in Azusa, Calif., has installed two 200-hp Dixon boilers, a 14 MMBtuh Sam Dick Industries vaporizer, and six 1150-gal. tanks on the property for the use of propane as a backup fuel. While themore » nursery ordinarily uses natural gas for water heating, there are times during the winter when the supply may be curtailed or interrupted. It is then that propane would be used to heat water to keep more than 1200 varieties of plants growing as they should.« less

  14. Apollo 16 prime and backup crewmen during geological field trip in New Mexico

    NASA Image and Video Library

    1971-09-09

    Dr. Lee Silver (pointing foregroung), California Institute of Technology, calls a geological feature near Taos, New Mexico, to the attention of Apollo 16 prime and backup crewmen during a geological field trip. The crewmen, from left to right, are Astronauts Charles M. Duke Jr., lunar module pilot; Fred W. Haise Jr., backup commander; Edgar D. Mitchell, backup Lunar Module pilot; and John W. Young, commander.

  15. Dedicated power supply subsystem for ultra-low noise preamplifiers and biophotonic sensors

    NASA Astrophysics Data System (ADS)

    SuraŻyński, Łukasz; Wierzba, Paweł; Zienkiewicz, Aleksandra

    2013-11-01

    It is very common for noise to have an influence on analog circuits. In order to preserve the quality of measurements taken by specific sensors and any noise dependent amplifiers which are correlated to them, all of these devices must be powered by low-noise power supplies. Therefore a necessity exists to develop new ultra-low noise power supplies which can cooperate with specified amplifiers and preamplifiers. Many well-known power supplies are particularly expensive and yet still have their disadvantages. This paper proposes a simple and inexpensive solution, which fulfills a specific criteria and can be treated as a base for improvement.

  16. Performance of fuel cell for energy supply of passive house

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Badea, G.; Felseghi, R. A., E-mail: Raluca.FELSEGHI@insta.utcluj.ro; Mureşan, D.

    2015-12-23

    Hydrogen technology and passive house represent two concepts with a remarkable role for the efficiency and decarbonisation of energy systems in the residential buildings area. Through design and functionality, the passive house can make maximum use of all available energy resources. One of the solutions to supply energy of these types of buildings is the fuel cell, using this technology integrated into a system for generating electricity from renewable primary sources, which take the function of backup power (energy reserve) to cover peak load and meteorological intermittents. In this paper is presented the results of the case study that providemore » an analysis of the energy, environmental and financial performances regarding energy supply of passive house by power generation systems with fuel cell fed with electrolytic hydrogen produced by harnessing renewable energy sources available. Hybrid systems have been configured and operate in various conditions of use for five differentiated locations according to the main areas of solar irradiation from the Romanian map. Global performance of hybrid systems is directly influenced by the availability of renewable primary energy sources - particular geo-climatic characteristics of the building emplacement.« less

  17. Precision control of high temperature furnaces using an auxiliary power supply and charged particle current flow

    DOEpatents

    Pollock, G.G.

    1997-01-28

    Two power supplies are combined to control a furnace. A main power supply heats the furnace in the traditional manner, while the power from the auxiliary supply is introduced as a current flow through charged particles existing due to ionized gas or thermionic emission. The main power supply provides the bulk heating power and the auxiliary supply provides a precise and fast power source such that the precision of the total power delivered to the furnace is improved. 5 figs.

  18. Milliwatt radioisotope power supply for the PASCAL Mars surface stations

    NASA Astrophysics Data System (ADS)

    Allen, Daniel T.; Murbach, Marcus S.

    2001-02-01

    A milliwatt power supply is being developed based on the 1 watt Light-Weight Radioisotope Heater Unit (RHU), which has already been used to provide heating alone on numerous spacecraft. In the past year the power supply has been integrated into the design of the proposed PASCAL Mars Network Mission, which is intended to place 24 surface climate monitoring stations on Mars. The PASCAL Mars mission calls for the individual surface stations to be transported together in one spacecraft on a trajectory direct from launch to orbit around Mars. From orbit around Mars each surface station will be deployed on a SCRAMP (slotted compression ramp) probe and, after aerodynamic and parachute deceleration, land at a preselected location on the planet. During descent sounding data and still images will be accumulated, and, once on the surface, the station will take measurements of pressure, temperature and overhead atmospheric optical depth for a period of 10 Mars years (18.8 Earth years). Power for periodic data acquisition and transmission to orbital then to Earth relay will come from a bank of ultracapacitors which will be continuously recharged by the radioisotope power supply. This electronic system has been designed and a breadboard built. In the ultimate design the electronics will be arrayed on the exterior surface of the radioisotope power supply in order to take advantage of the reject heat. This assembly in turn is packaged within the SCRAMP, and that assembly comprises the surface station. An electrically heated but otherwise prototypical power supply was operated in combination with the surface station breadboard system, which included the ultracapacitors. Other issues addressed in this work have been the capability of the generator to withstand the mechanical shock of the landing on Mars and the effectiveness of the generator's multi-foil vacuum thermal insulation. .

  19. 14 CFR 125.377 - Fuel supply: Turbine-engine-powered airplanes other than turbopropeller.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AIRCRAFT Flight Release Rules § 125.377 Fuel supply: Turbine-engine-powered airplanes other than... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Fuel supply: Turbine-engine-powered... or take off a turbine-engine powered airplane (other than a turbopropeller-powered airplane) unless...

  20. 14 CFR 125.377 - Fuel supply: Turbine-engine-powered airplanes other than turbopropeller.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AIRCRAFT Flight Release Rules § 125.377 Fuel supply: Turbine-engine-powered airplanes other than... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Fuel supply: Turbine-engine-powered... or take off a turbine-engine powered airplane (other than a turbopropeller-powered airplane) unless...

  1. 77 FR 22472 - Energy Conservation Program: Energy Conservation Standards for Certain External Power Supplies...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-16

    ... Conservation Program: Energy Conservation Standards for Certain External Power Supplies; Correction AGENCY... external power supplies to re-insert a table that had been inadvertently deleted by a technical amendment... standards for all Class A external power supplies to meet. DATES: This correction is effective April 16...

  2. Apollo 11 - Prime and Backup Crews - Geology Training - TX

    NASA Image and Video Library

    1969-03-03

    S69-25199 (25 Feb. 1969) --- Two Apollo 11 astronauts study a rock specimen during a geological field trip to the Quitman Mountains area near the Fort Quitman ruins in far west Texas. On the left is James A. Lovell Jr., Apollo 11 backup crew commander; and on the right is Fred W. Haise Jr., backup crew lunar module pilot. Lovell holds a camera which was used in simulating taking pictures of actual lunar samples on the surface of the Moon.

  3. Independent backup mode transfer and mechanism for digital control computers

    NASA Technical Reports Server (NTRS)

    Tulpule, Bhalchandra R. (Inventor); Oscarson, Edward M. (Inventor)

    1992-01-01

    An interrupt is provided to a signal processor having a non-maskable interrupt input, in response to the detection of a request for transfer to backup software. The signal processor provides a transfer signal to a transfer mechanism only after completion of the present machine cycle. Transfer to the backup software is initiated by the transfer mechanism only upon reception of the transfer signal.

  4. Fuel cell power supply with oxidant and fuel gas switching

    DOEpatents

    McElroy, James F.; Chludzinski, Paul J.; Dantowitz, Philip

    1987-01-01

    This invention relates to a fuel cell vehicular power plant. Fuel for the fuel stack is supplied by a hydrocarbon (methanol) catalytic cracking reactor and CO shift reactor. A water electrolysis subsystem is associated with the stack. During low power operation part of the fuel cell power is used to electrolyze water with hydrogen and oxygen electrolysis products being stored in pressure vessels. During peak power intervals, viz, during acceleration or start-up, pure oxygen and pure hydrogen from the pressure vessel are supplied as the reaction gases to the cathodes and anodes in place of air and methanol reformate. This allows the fuel cell stack to be sized for normal low power/air operation but with a peak power capacity several times greater than that for normal operation.

  5. Fuel cell power supply with oxidant and fuel gas switching

    DOEpatents

    McElroy, J.F.; Chludzinski, P.J.; Dantowitz, P.

    1987-04-14

    This invention relates to a fuel cell vehicular power plant. Fuel for the fuel stack is supplied by a hydrocarbon (methanol) catalytic cracking reactor and CO shift reactor. A water electrolysis subsystem is associated with the stack. During low power operation part of the fuel cell power is used to electrolyze water with hydrogen and oxygen electrolysis products being stored in pressure vessels. During peak power intervals, viz, during acceleration or start-up, pure oxygen and pure hydrogen from the pressure vessel are supplied as the reaction gases to the cathodes and anodes in place of air and methanol reformate. This allows the fuel cell stack to be sized for normal low power/air operation but with a peak power capacity several times greater than that for normal operation. 2 figs.

  6. Design of a Percussion and Electric Primer Gun Firing Power Supply

    DTIC Science & Technology

    2014-07-01

    solenoid failure. As new instrumentation techniques such as high-speed video and laser interferometry have been introduced into our gun testing...to drive a solenoid into a percussion primer or ignite the M52A3B1 electric primer. To reduce power requirements, it uses charged capacitor banks to...drive the solenoid or ignite the primer. This report details the design and construction of the power supplies. 15. SUBJECT TERMS power supply

  7. Feedback circuit design of an auto-gating power supply for low-light-level image intensifier

    NASA Astrophysics Data System (ADS)

    Yang, Ye; Yan, Bo; Zhi, Qiang; Ni, Xiao-bing; Li, Jun-guo; Wang, Yu; Yao, Ze

    2015-11-01

    This paper introduces the basic principle of auto-gating power supply which using a hybrid automatic brightness control scheme. By the analysis of current as image intensifier to special requirements of auto-gating power supply, a feedback circuit of the auto-gating power supply is analyzed. Find out the reason of the screen flash after the auto-gating power supply assembled image intensifier. This paper designed a feedback circuit which can shorten the response time of auto-gating power supply and improve screen slight flicker phenomenon which the human eye can distinguish under the high intensity of illumination.

  8. Self-Powered Nanocomposites under an External Rotating Magnetic Field for Noninvasive External Power Supply Electrical Stimulation.

    PubMed

    Wu, Fengluan; Jin, Long; Zheng, Xiaotong; Yan, Bingyun; Tang, Pandeng; Yang, Huikai; Deng, Weili; Yang, Weiqing

    2017-11-08

    Electrical stimulation in biology and gene expression has attracted considerable attention in recent years. However, it is inconvenient that the electric stimulation needs to be supplied an implanted power-transported wire connecting the external power supply. Here, we fabricated a self-powered composite nanofiber (CNF) and developed an electric generating system to realize electrical stimulation based on the electromagnetic induction effect under an external rotating magnetic field. The self-powered CNFs generating an electric signal consist of modified MWNTs (m-MWNTs) coated Fe 3 O 4 /PCL fibers. Moreover, the output current of the nanocomposites can be increased due to the presence of the magnetic nanoparticles during an external magnetic field is applied. In this paper, these CNFs were employed to replace a bullfrog's sciatic nerve and to realize the effective functional electrical stimulation. The cytotoxicity assays and animal tests of the nanocomposites were also used to evaluate the biocompatibility and tissue integration. These results demonstrated that this self-powered CNF not only plays a role as power source but also can act as an external power supply under an external rotating magnetic field for noninvasive the replacement of injured nerve.

  9. Prognostic health monitoring in switch-mode power supplies with voltage regulation

    NASA Technical Reports Server (NTRS)

    Hofmeister, James P (Inventor); Judkins, Justin B (Inventor)

    2009-01-01

    The system includes a current injection device in electrical communication with the switch mode power supply. The current injection device is positioned to alter the initial, non-zero load current when activated. A prognostic control is in communication with the current injection device, controlling activation of the current injection device. A frequency detector is positioned to receive an output signal from the switch mode power supply and is able to count cycles in a sinusoidal wave within the output signal. An output device is in communication with the frequency detector. The output device outputs a result of the counted cycles, which are indicative of damage to an a remaining useful life of the switch mode power supply.

  10. Backup of renewable energy for an electrical island: case study of Israeli electricity system--current status.

    PubMed

    Fakhouri, A; Kuperman, A

    2014-01-01

    The paper focuses on the quantitative analysis of Israeli Government's targets of 10% renewable energy penetration by 2020 and determining the desired methodology (models) for assessing the effects on the electricity market, addressing the fact that Israel is an electricity island. The main objective is to determine the influence of achieving the Government's goals for renewable energy penetration on the need for backup in the Israeli electricity system. This work presents the current situation of the Israeli electricity market and the study to be taken in order to assess the undesirable effects resulting from the intermittency of electricity generated by wind and solar power stations as well as presents some solutions to mitigating these phenomena. Future work will focus on a quantitative analysis of model runs and determine the amounts of backup required relative to the amount of installed capacity from renewable resources.

  11. The depth of the honeybee's backup sun-compass systems.

    PubMed

    Dovey, Katelyn M; Kemfort, Jordan R; Towne, William F

    2013-06-01

    Honeybees have at least three compass mechanisms: a magnetic compass; a celestial or sun compass, based on the daily rotation of the sun and sun-linked skylight patterns; and a backup celestial compass based on a memory of the sun's movements over time in relation to the landscape. The interactions of these compass systems have yet to be fully elucidated, but the celestial compass is primary in most contexts, the magnetic compass is a backup in certain contexts, and the bees' memory of the sun's course in relation to the landscape is a backup system for cloudy days. Here we ask whether bees have any further compass systems, for example a memory of the sun's movements over time in relation to the magnetic field. To test this, we challenged bees to locate the sun when their known celestial compass systems were unavailable, that is, under overcast skies in unfamiliar landscapes. We measured the bees' knowledge of the sun's location by observing their waggle dances, by which foragers indicate the directions toward food sources in relation to the sun's compass bearing. We found that bees have no celestial compass systems beyond those already known: under overcast skies in unfamiliar landscapes, bees attempt to use their landscape-based backup system to locate the sun, matching the landscapes or skylines at the test sites with those at their natal sites as best they can, even if the matches are poor and yield weak or inconsistent orientation.

  12. Design of 1 MHz Solid State High Frequency Power Supply

    NASA Astrophysics Data System (ADS)

    Parmar, Darshan; Singh, N. P.; Gajjar, Sandip; Thakar, Aruna; Patel, Amit; Raval, Bhavin; Dhola, Hitesh; Dave, Rasesh; Upadhay, Dishang; Gupta, Vikrant; Goswami, Niranjan; Mehta, Kush; Baruah, Ujjwal

    2017-04-01

    High Frequency Power supply (HFPS) is used for various applications like AM Transmitters, metallurgical applications, Wireless Power Transfer, RF Ion Sources etc. The Ion Source for a Neutral beam Injector at ITER-India uses inductively coupled power source at High Frequency (∼1 MHz). Switching converter based topology used to generate 1 MHz sinusoidal output is expected to have advantages on efficiency and reliability as compared to traditional RF Tetrode tubes based oscillators. In terms of Power Electronics, thermal and power coupling issues are major challenges at such a high frequency. A conceptual design for a 200 kW, 1 MHz power supply and a prototype design for a 600 W source been done. The prototype design is attempted with Class-E amplifier topology where a MOSFET is switched resonantly. The prototype uses two low power modules and a ferrite combiner to add the voltage and power at the output. Subsequently solution with Class-D H-Bridge configuration have been evaluated through simulation where module design is stable as switching device do not participate in resonance, further switching device voltage rating is substantially reduced. The rating of the modules is essentially driven by the maximum power handling capacity of the MOSFETs and ferrites in the combiner circuit. The output passive network including resonance tuned network and impedance matching network caters for soft switching and matches the load impedance to 50ohm respectively. This paper describes the conceptual design of a 200 kW high frequency power supply and experimental results of the prototype 600 W, 1 MHz source.

  13. Improving the Quality of Backup Process for Publishing Houses and Printing Houses

    NASA Astrophysics Data System (ADS)

    Proskuriakov, N. E.; Yakovlev, B. S.; Pries, V. V.

    2018-04-01

    The analysis of main types for data threats, used by print media, and their influence on the vitality and security of information is made. The influence of the programs settings for preparing archive files, the types of file managers on the backup process is analysed. We proposed a simple and economical version of the practical implementation of the backup process consisting of 4 components: the command line interpreter, the 7z archiver, the Robocopy utility, and network storage. We recommend that the best option would be to create backup copies, consisting of three local copies of data and two network copies.

  14. High-Voltage Power Supply With Fast Rise and Fall Times

    NASA Technical Reports Server (NTRS)

    Bearden, Douglas B.; Acker, Richard M.; Kapuslka, Robert E.

    2007-01-01

    A special-purpose high-voltage power supply can be electronically switched on and off with fast rise and fall times, respectively. The output potential is programmable from 20 to 1,250 V. An output current of 50 A can be sustained at 1,250 V. The power supply was designed specifically for electronically shuttering a microchannel plate in an x-ray detector that must operate with exposure times as short as 1 ms. The basic design of the power supply is also adaptable to other applications in which there are requirements for rapid slewing of high voltages. The power-supply circuitry (see figure) includes a preregulator, which is used to program the output at 1/30 of the desired output potential. After the desired voltage has been set, the outputs of a pulse width modulator (PWM) are enabled and used to amplify the preregulator output potential by 30. The amplification is achieved by use of two voltage doublers with a transformer that has two primary and two secondary windings. A resistor is used to limit the current by controlling the drive voltage of two field-effect transistors (FETs) during turn-on of the PWM. A pulse transformer is used to turn on four FETs to short-circuit four output capacitors when the outputs of the PWM have been disabled. The most notable aspects of the performance of the power supply are a rise time of only 80 s and a fall time of only 60 s at a load current of 50 A or less. Another notable aspect is that the application of a 0-to-5-V square wave to a shutdown pin of the PWM causes the production of a 0-to-1,250-V square wave at the output terminals.

  15. [Positional accuracy and quality assurance of Backup JAWs required for volumetric modulated arc therapy].

    PubMed

    Tatsumi, Daisaku; Nakada, Ryosei; Ienaga, Akinori; Yomoda, Akane; Inoue, Makoto; Ichida, Takao; Hosono, Masako

    2012-01-01

    The tolerance of the Backup diaphragm (Backup JAW) setting in Elekta linac was specified as 2 mm according to the AAPM TG-142 report. However, the tolerance and the quality assurance procedure for volumetric modulated arc therapy (VMAT) was not provided. This paper describes positional accuracy and quality assurance procedure of the Backup JAWs required for VMAT. It was found that a gap-width error of the Backup JAW by a sliding window test needed to be less than 1.5 mm for prostate VMAT delivery. It was also confirmed that the gap-widths had been maintained with an error of 0.2 mm during the past one year.

  16. The Design of the 4-Megawatt Induction Heating Power Supply at AEDC

    DTIC Science & Technology

    1976-04-01

    AEDC-TR-76-26 p ’ t . ~ F i , .~ r),’, • #, THE DESIGN OF THE 4-MEGAWATT INDUCTION HEATING POWER SUPPLY AT AEDC PROPULSION WIND TUNNEL...NUMBER ]2 GOVT ACCESSION NO. [ AEDC-TR-76-26 4. T I T L E ( ~ d 5ubll l le) THE DESIGN OF THE 4-MEGAWATT INDUCTION HEATING POWER SUPPLY AT AEDC 7...e m and the supply of e l e c t r i c a l power to the o s c i l l a t o r were des igned by J. B. Carson , ARO, Inc. Ashley Bock, who was r

  17. Assembly and Testing of a Compact, Lightweight Homopolar Generator Power Supply

    DTIC Science & Technology

    1983-06-01

    ASSEMBLY AND TESTING OF A COMPACT, LIGHTWEIGHT HOMOPOLAR GENERATOR POWER SUPPLY J. H. Gully Center for Electromechanics The University of Texas...portable systems. The initial step in developing the power supply was to design, fabricate and test a prototype homopolar generator, attempting to...levels. SUPPORT STRUCTURE HYDRAULIC Fig. 1. Section through compact homopolar generator ~1 l-oot!:__ __ 63.80 ----~ (25. 12) ~------ 85.88

  18. Arcjet power supply and start circuit

    NASA Technical Reports Server (NTRS)

    Gruber, Robert P. (Inventor)

    1988-01-01

    A dc power supply for spacecraft arcjet thrusters has an integral automatic starting circuit and an output averaging inductor. The output averaging inductor, in series with the load, provides instantaneous current control, and ignition pulse and an isolated signal proportional to the arc voltage. A pulse width modulated converter, close loop configured, is also incorporated to give fast response output current control.

  19. Dynamics of global supply chain and electric power networks: Models, pricing analysis, and computations

    NASA Astrophysics Data System (ADS)

    Matsypura, Dmytro

    In this dissertation, I develop a new theoretical framework for the modeling, pricing analysis, and computation of solutions to electric power supply chains with power generators, suppliers, transmission service providers, and the inclusion of consumer demands. In particular, I advocate the application of finite-dimensional variational inequality theory, projected dynamical systems theory, game theory, network theory, and other tools that have been recently proposed for the modeling and analysis of supply chain networks (cf. Nagurney (2006)) to electric power markets. This dissertation contributes to the extant literature on the modeling, analysis, and solution of supply chain networks, including global supply chains, in general, and electric power supply chains, in particular, in the following ways. It develops a theoretical framework for modeling, pricing analysis, and computation of electric power flows/transactions in electric power systems using the rationale for supply chain analysis. The models developed include both static and dynamic ones. The dissertation also adds a new dimension to the methodology of the theory of projected dynamical systems by proving that, irrespective of the speeds of adjustment, the equilibrium of the system remains the same. Finally, I include alternative fuel suppliers, along with their behavior into the supply chain modeling and analysis framework. This dissertation has strong practical implications. In an era in which technology and globalization, coupled with increasing risk and uncertainty, complicate electricity demand and supply within and between nations, the successful management of electric power systems and pricing become increasingly pressing topics with relevance not only for economic prosperity but also national security. This dissertation addresses such related topics by providing models, pricing tools, and algorithms for decentralized electric power supply chains. This dissertation is based heavily on the following

  20. RHIC BEAM ABORT KICKER POWER SUPPLY SYSTEM COMMISSIONING EXPERIENCE AND REMAINING ISSUES.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ZHANG,W.; AHRENS,L.A.; MI,J.

    2001-06-18

    The RHIC Beam Abort Kicker Power Supply Systems commissioning experience and the remaining issues will be reported in this paper. The RHIC Blue Ring Beam Abort Kicker Power Supply System initial commissioning took place in June 1999. Its identical system in Yellow Ring was brought on line during Spring 2000. Each of the RHIC Beam Abort Kicker Power Supply Systems consists of five high voltage modulators and subsystems. These systems are critical devices for RHIC machine protection and environmental protection. They are required to be effective, reliable and operating with sufficient redundancy to safely abort the beam to its beammore » dump at the end of accumulation or at any time when they are commanded. To deflect 66 GeV ion beam to the beam absorbers, the RHIC Beam Abort Kicker Power Supply Systems were operated at 22 kV level. The RHIC 2000 commissioning run was very successful.« less

  1. Design of Instantaneous High Power Supply System with power distribution management for portable military devices

    NASA Astrophysics Data System (ADS)

    Kwak, Kiho; Kwak, Dongmin; Yoon, Joohong

    2015-08-01

    A design of an Instantaneous High Power Supply System (IHPSS) with a power distribution management (PDM) for portable military devices is newly addressed. The system includes a power board and a hybrid battery that can not only supply instantaneous high power but also maintain stable operation at critical low temperature (-30 °C). The power leakage and battery overcharge are effectively prevented by the optimal PDM. The performance of the proposed system under the required pulse loads and the operating conditions of a Korean Advanced Combat Rifle employed in the battlefield is modeled with simulations and verified experimentally. The system with the IHPSS charged the fuse setter with 1.7 times higher voltage (8.6 V) than the one without (5.4 V) under the pulse discharging rate (1 A at 0.5 duty, 1 ms) for 500 ms.

  2. A hybrid data compression approach for online backup service

    NASA Astrophysics Data System (ADS)

    Wang, Hua; Zhou, Ke; Qin, MingKang

    2009-08-01

    With the popularity of Saas (Software as a service), backup service has becoming a hot topic of storage application. Due to the numerous backup users, how to reduce the massive data load is a key problem for system designer. Data compression provides a good solution. Traditional data compression application used to adopt a single method, which has limitations in some respects. For example data stream compression can only realize intra-file compression, de-duplication is used to eliminate inter-file redundant data, compression efficiency cannot meet the need of backup service software. This paper proposes a novel hybrid compression approach, which includes two levels: global compression and block compression. The former can eliminate redundant inter-file copies across different users, the latter adopts data stream compression technology to realize intra-file de-duplication. Several compressing algorithms were adopted to measure the compression ratio and CPU time. Adaptability using different algorithm in certain situation is also analyzed. The performance analysis shows that great improvement is made through the hybrid compression policy.

  3. Backup Warning Signals: Driver Perception and Response

    DOT National Transportation Integrated Search

    1996-08-01

    This report describes the findings of three experiments that concern driver reaction to acoustic signals that might be used for backup warning devices. Intelligent warning devices are under development that will use vehicle-based sensors to warn back...

  4. High Speed and High Functional Inverter Power Supplies for Plasma Generation and Control, and their Performance

    NASA Astrophysics Data System (ADS)

    Uesugi, Yoshihiko; Razzak, Mohammad A.; Kondo, Kenji; Kikuchi, Yusuke; Takamura, Shuichi; Imai, Takahiro; Toyoda, Mitsuhiro

    The Rapid development of high power and high speed semiconductor switching devices has led to their various applications in related plasma fields. Especially, a high speed inverter power supply can be used as an RF power source instead of conventional linear amplifiers and a power supply to control the magnetic field in a fusion plasma device. In this paper, RF thermal plasma production and plasma heating experiments are described emphasis placed on using a static induction transistor inverter at a frequency range between 200 kHz and 2.5 MHz as an RF power supply. Efficient thermal plasma production is achieved experimentally by using a flexible and easily operated high power semiconductor inverter power supply. Insulated gate bipolar transistor (IGBT) inverter power supplies driven by a high speed digital signal processor are applied as tokamak joule coil and vertical coil power supplies to control plasma current waveform and plasma equilibrium. Output characteristics, such as the arbitrary bipolar waveform generation of a pulse width modulation (PWM) inverter using digital signal processor (DSP) can be successfully applied to tokamak power supplies for flexible plasma current operation and fast position control of a small tokamak.

  5. Power Supply Fault Tolerant Reliability Study

    DTIC Science & Technology

    1991-04-01

    easier to design than for equivalent bipolar transistors. MCDONNELL DOUGLAS ELECTRONICS SYSTEMS COMPANY 9. Base circuitry should be designed to drive...SWITCHING REGULATORS (Ref. 28), SWITCHING AND LINEAR POWER SUPPLY DESIGN (Ref. 25) 6. Sequence the turn-off/turn-on logic in an orderly and controllable ...for equivalent bipolar transistors. MCDONNELL DOUGLAS ELECTRONICS SYSTEMS COMPANY 8. Base circuitry should be designed to drive the transistor into

  6. A real time status monitor for transistor bank driver power limit resistor in boost injection kicker power supply

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mi, J.; Tan, Y.; Zhang, W.

    2011-03-28

    For years suffering of Booster Injection Kicker transistor bank driver regulator troubleshooting, a new real time monitor system has been developed. A simple and floating circuit has been designed and tested. This circuit monitor system can monitor the driver regulator power limit resistor status in real time and warn machine operator if the power limit resistor changes values. This paper will mainly introduce the power supply and the new designed monitoring system. This real time resistor monitor circuit shows a useful method to monitor some critical parts in the booster pulse power supply. After two years accelerator operation, it showsmore » that this monitor works well. Previously, we spent a lot of time in booster machine trouble shooting. We will reinstall all 4 PCB into Euro Card Standard Chassis when the power supply system will be updated.« less

  7. 46 CFR 111.97-5 - Electric and hydraulic power supply.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...

  8. 46 CFR 111.97-5 - Electric and hydraulic power supply.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...

  9. 46 CFR 111.97-5 - Electric and hydraulic power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...

  10. 46 CFR 111.97-5 - Electric and hydraulic power supply.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...

  11. 46 CFR 111.97-5 - Electric and hydraulic power supply.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...

  12. Intermodulation components in the transmitter RF output due to high voltage power supply ripple

    NASA Technical Reports Server (NTRS)

    Finnegan, E. J.

    1977-01-01

    The economic feasibility of eliminating the 400-Hz motor-generator sets used to provide power to the high-voltage power supplies of the 20-kW transmitters and replace them with a 60-Hz high-voltage power supply was investigated. The efficiency of a power supply that runs from the 60-Hz line directly would pay for itself in about seven years and could be designed so that the transmitter would meet all the incidental phase and amplitude modulation specifications.

  13. Backup of Renewable Energy for an Electrical Island: Case Study of Israeli Electricity System—Current Status

    PubMed Central

    Fakhouri, A.; Kuperman, A.

    2014-01-01

    The paper focuses on the quantitative analysis of Israeli Government's targets of 10% renewable energy penetration by 2020 and determining the desired methodology (models) for assessing the effects on the electricity market, addressing the fact that Israel is an electricity island. The main objective is to determine the influence of achieving the Government's goals for renewable energy penetration on the need for backup in the Israeli electricity system. This work presents the current situation of the Israeli electricity market and the study to be taken in order to assess the undesirable effects resulting from the intermittency of electricity generated by wind and solar power stations as well as presents some solutions to mitigating these phenomena. Future work will focus on a quantitative analysis of model runs and determine the amounts of backup required relative to the amount of installed capacity from renewable resources. PMID:24624044

  14. Mechanization of and experience with a triplex fly-by-wire backup control system

    NASA Technical Reports Server (NTRS)

    Lock, W. P.; Petersen, W. R.; Whitman, G. B.

    1976-01-01

    A redundant three axis analog control system was designed and developed to back up a digital fly by wire control system for an F-8C airplane. The mechanization and operational experience with the backup control system, the problems involved in synchronizing it with the primary system, and the reliability of the system are discussed. The backup control system was dissimilar to the primary system, and it provided satisfactory handling through the flight envelope evaluated. Limited flight tests of a variety of control tasks showed that control was also satisfactory when the backup control system was controlled by a minimum displacement (force) side stick. The operational reliability of the F-8 digital fly by wire control system was satisfactory, with no unintentional downmodes to the backup control system in flight. The ground and flight reliability of the system's components is discussed.

  15. Multiphase power supply when inverting currents for group of Peltier elements

    NASA Astrophysics Data System (ADS)

    Osintsev, A. V.; Sobko, A. A.; Komnatnov, M. E.

    2018-05-01

    The use of multiphase power supply of a group of Peltier elements (PE) is considered to reduce the load on the power source. Schemes and a control layout with the use of the H-bridge, allowing the invert of the current through the PE, are given. The analysis of the operation of the used H-bridges and PE in the frequency range of the control PWM signal from 30 Hz to 32 kHz is performed. The algorithm for monitoring the current sensors is presented and the time diagrams of the currents are represented through the PE and H-bridges using a two-phase and four-phase control PWM signal for one, two and four phases of the supply. The results showed stable heating and cooling of the PE at frequencies from 30 Hz to 1 kHz. The use of multiphase power supply of PE made it possible to significantly reduce the load on the power source.

  16. Design and testing of 45 kV, 50 kHz pulse power supply for dielectric barrier discharges

    NASA Astrophysics Data System (ADS)

    Sharma, Surender Kumar; Shyam, Anurag

    2016-10-01

    The design, construction, and testing of high frequency, high voltage pulse power supply are reported. The purpose of the power supply is to generate dielectric barrier discharges for industrial applications. The power supply is compact and has the advantage of low cost, over current protection, and convenient control for voltage and frequency selection. The power supply can generate high voltage pulses of up to 45 kV at the repetitive frequency range of 1 kHz-50 kHz with 1.2 kW input power. The output current of the power supply is limited to 500 mA. The pulse rise time and fall time are less than 2 μs and the pulse width is 2 μs. The power supply is short circuit proof and can withstand variable plasma load conditions. The power supply mainly consists of a half bridge series resonant converter to charge an intermediate capacitor, which discharges through a step-up transformer at high frequency to generate high voltage pulses. Semiconductor switches and amorphous cores are used for power modulation at higher frequencies. The power supply is tested with quartz tube dielectric barrier discharge load and worked stably. The design details and the performance of the power supply on no load and dielectric barrier discharge load are presented.

  17. Design and testing of 45 kV, 50 kHz pulse power supply for dielectric barrier discharges.

    PubMed

    Sharma, Surender Kumar; Shyam, Anurag

    2016-10-01

    The design, construction, and testing of high frequency, high voltage pulse power supply are reported. The purpose of the power supply is to generate dielectric barrier discharges for industrial applications. The power supply is compact and has the advantage of low cost, over current protection, and convenient control for voltage and frequency selection. The power supply can generate high voltage pulses of up to 45 kV at the repetitive frequency range of 1 kHz-50 kHz with 1.2 kW input power. The output current of the power supply is limited to 500 mA. The pulse rise time and fall time are less than 2 μs and the pulse width is 2 μs. The power supply is short circuit proof and can withstand variable plasma load conditions. The power supply mainly consists of a half bridge series resonant converter to charge an intermediate capacitor, which discharges through a step-up transformer at high frequency to generate high voltage pulses. Semiconductor switches and amorphous cores are used for power modulation at higher frequencies. The power supply is tested with quartz tube dielectric barrier discharge load and worked stably. The design details and the performance of the power supply on no load and dielectric barrier discharge load are presented.

  18. The anode power supply for the ECRH system on the J-TEXT tokamak

    NASA Astrophysics Data System (ADS)

    Donghui, XIA; Fangtai, CUI; Changhai, LIU; Zhenxiong, YU; Yikun, JIN; Zhijiang, WANG; J-TEXT, Team1

    2018-01-01

    The electron cyclotron resonance heating (ECRH) system with a 60 GHz/200 kW/0.5 s gyrotron donated by the Culham Science Center is being developed on the J-TEXT tokamak for plasma heating, current drive and MHD studies. Simultaneously, an anode power supply (APS) has been rebuilt and tested for the output power control of the gyrotron, of which the input voltage is derived from an 80 kV negative cathode power supply. The control strategy by controlling the grid voltage of the tetrode TH5186 is applied to obtain an accurate anode climbing voltage, of which the output voltage can be obtained from 0-30 kV with respect to the cathode power supply. The characteristics of the APS, including control, protection, modulation, and output waveform, were tested with a 100 kV/60 A negative cathode power supply, a dummy load and the ECRH control system. The results indicate that the APS can meet the requirements of the ECRH system on J-TEXT.

  19. A multi-channel isolated power supply in non-equipotential circuit

    NASA Astrophysics Data System (ADS)

    Li, Xiang; Zhao, Bo-Wen; Zhang, Yan-Chi; Xie, Da

    2018-04-01

    A multi-channel isolation power supply is designed for the problems of different MOSFET or IGBT in the non-equipotential circuit in this paper. It mainly includes the square wave generation circuit, the high-frequency transformer and the three-terminal stabilized circuit. The first part is used to generate the 24V square wave, and as the input of the magnetic ring transformer. In the second part, the magnetic ring transformer consists of one input and three outputs to realize multi-channel isolation output. The third part can output different potential and realize non-equal potential function through the three-terminal stabilized chip. In addition, the multi-channel isolation power source proposed in this paper is Small size, high reliability and low price, and it is convenient for power electronic switches that operate on multiple different potentials. Therefore, the research on power supply of power electronic circuit has practical significance.

  20. Preliminary design of a mobile lunar power supply

    NASA Technical Reports Server (NTRS)

    Schmitz, Paul C.; Kenny, Barbara H.; Fulmer, Christopher R.

    1991-01-01

    A preliminary design for a Stirling isotope power system for use as a mobile lunar power supply is presented. Performance and mass of the components required for the system are estimated. These estimates are based on power requirements and the operating environment. Optimizations routines are used to determine minimum mass operational points. Shielding for the isotope system are given as a function of the allowed dose, distance from the source, and the time spent near the source. The technologies used in the power conversion and radiator systems are taken from ongoing research in the Civil Space Technology Initiative (CSTI) program.

  1. Design and application of a new control system for tokamak ECRH power supply

    NASA Astrophysics Data System (ADS)

    Hao, Xu; Zhang, Jian; Huang, Yiyun

    2016-03-01

    The biggest challenge of designing and building tokamak electron cyclotron resonance heating (ECRH) pulse step modulation (PSM) power supply is satisfying its required output voltage rising time to be less than 100 µs while suppressing the voltage overshoot to be no more than 1%. To fulfill the two requirements, a new control strategy with startup time in microsecond range is proposed in this paper, and a new control system to realize the control strategy is introduced. The control system was built and tested on 60 kV/50 A ECRH power supply. The experimental results indicate that the control system can restrain the overshoot effectively, increase response speed, and obviously improve the dynamic characteristics of the PSM power supply system. Thus, the proposed control system helps the PSM power supply to meet the design specifications.

  2. 250 kV 6 mA compact Cockcroft-Walton high-voltage power supply.

    PubMed

    Ma, Zhan-Wen; Su, Xiao-Dong; Lu, Xiao-Long; Wei, Zhen; Wang, Jun-Run; Huang, Zhi-Wu; Miao, Tian-You; Su, Tong-Ling; Yao, Ze-En

    2016-08-01

    A compact power supply system for a compact neutron generator has been developed. A 4-stage symmetrical Cockcroft-Walton circuit is adopted to produce 250 kV direct current high-voltage. A 2-stage 280 kV isolation transformer system is used to drive the ion source power supply. For a compact structure, safety, and reliability during the operation, the Cockcroft-Walton circuit and the isolation transformer system are enclosed in an epoxy vessel containing the transformer oil whose size is about ∅350 mm × 766 mm. Test results indicate that the maximum output voltage of the power supply is 282 kV, and the stability of the output voltage is better than 0.63% when the high voltage power supply is operated at 250 kV, 6.9 mA with the input voltage varying ±10%.

  3. The status of power supplies for primary electric propulsion in the U.S.A.

    NASA Technical Reports Server (NTRS)

    Jones, R. M.; Scott-Monck, J. A.

    1984-01-01

    This paper reviews the status of and requirements on solar electric and nuclear electric power supplies for primary electric propulsion missions. The power supply requirements of power level, specific mass (kg/kWe) and lifetime are defined as a function of the mission and electric propulsion system characteristics for planetary missions. The technology status of planar and concentrator arrays is discussed. Nuclear reactors and thermoelectric, thermionic, Brayton and Rankine conversion technologies are reviewed, as well as recent nuclear power system design concepts and program activity. Technology projections for power supplies applicable to primary electric propulsion missions are included.

  4. Hydrogen-oxygen steam generator applications for increasing the efficiency, maneuverability and reliability of power production

    NASA Astrophysics Data System (ADS)

    Schastlivtsev, A. I.; Borzenko, V. I.

    2017-11-01

    The comparative feasibility study of the energy storage technologies showed good applicability of hydrogen-oxygen steam generators (HOSG) based energy storage systems with large-scale hydrogen production. The developed scheme solutions for the use of HOSGs for thermal power (TPP) and nuclear power plants (NPP), and the feasibility analysis that have been carried out have shown that their use makes it possible to increase the maneuverability of steam turbines and provide backup power supply in the event of failure of the main steam generating equipment. The main design solutions for the integration of hydrogen-oxygen steam generators into the main power equipment of TPPs and NPPs, as well as their optimal operation modes, are considered.

  5. A Real-Time Decision Support System for Voltage Collapse Avoidance in Power Supply Networks

    NASA Astrophysics Data System (ADS)

    Chang, Chen-Sung

    This paper presents a real-time decision support system (RDSS) based on artificial intelligence (AI) for voltage collapse avoidance (VCA) in power supply networks. The RDSS scheme employs a fuzzy hyperrectangular composite neural network (FHRCNN) to carry out voltage risk identification (VRI). In the event that a threat to the security of the power supply network is detected, an evolutionary programming (EP)-based algorithm is triggered to determine the operational settings required to restore the power supply network to a secure condition. The effectiveness of the RDSS methodology is demonstrated through its application to the American Electric Power Provider System (AEP, 30-bus system) under various heavy load conditions and contingency scenarios. In general, the numerical results confirm the ability of the RDSS scheme to minimize the risk of voltage collapse in power supply networks. In other words, RDSS provides Power Provider Enterprises (PPEs) with a viable tool for performing on-line voltage risk assessment and power system security enhancement functions.

  6. Solar-Powered Supply Is Light and Reliable

    NASA Technical Reports Server (NTRS)

    Willis, A. E.; Garrett, H.; Matheney, J.

    1982-01-01

    DC supply originally intended for use in solar-powered spacecraft propulsion is lightweight and very reliable. Operates from 100-200 volt output of solar panels to produce 11 different dc voltages, with total demand of 3,138 watts. With exception of specially wound inductors and transformers, system uses readily available components.

  7. A unique power supply for the PEP II klystron at SLAC

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cassel, R.; Nguyen, M.N.

    1997-07-01

    Each of the eight 1.2 MW RF klystrons for the PEP-II storage rings require a 2.5 MVA DC power supply of 83 Kv at 23 amps. The design for the supply was base on three factors, low cost, small size to fit existing substation pads, and good protection against damage to the klystron including klystron gun arcs. The supply uses a 12 pulse 12.5 KV primary thyristor star point controller with primary filter inductor to provide rapid voltage control, good voltage regulation, and fast turn off during klystron tube faults. The supply also uses a unique secondary rectifier, filter capacitormore » configuration to minimize the energy available under a klystron fault. The voltage control is from 0--90 KV with a regulation of < 0.1% and voltage ripple of < 1% P-P, (< 0.2% RMS) above 60 KV. The supply utilizes a thyristor crowbar, which under a klystron tube arc limits the energy in the klystron arc to < 5 joules. If the thyristor crowbar is disabled the energy supplied is < 40 joules into the arc. The size of the supply was reduced small enough to fit the existing PEP transformer yard pads. The cost of the power supply was < $140 per KVA.« less

  8. Power supplies for dual-frequency induction melting of metals

    NASA Astrophysics Data System (ADS)

    Lusgin, V. I.; Koptyakov, A. S.; Petrov, A. U.; Zinovev, K. A.; Kamaev, D. A.

    2018-02-01

    The article discusses the benefits of multi frequency induction melting in the production of synthetic cast iron, structural (electric circuit) principles of dual frequency Power supplies of melting systems. The ways of electric power regulation of low frequency and high frequency components of the current in the inductor sections of furnace are demonstrated, namely power rescheduling at the metal melting stage, alloying stage and decarburizing of synthetic cast iron.

  9. 26 CFR 48.4082-4 - Diesel fuel and kerosene; back-up tax.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 16 2011-04-01 2011-04-01 false Diesel fuel and kerosene; back-up tax. 48.4082..., and Taxable Fuel Taxable Fuel § 48.4082-4 Diesel fuel and kerosene; back-up tax. (a) Imposition of tax... fuel or kerosene on which tax has not been imposed by section 4081; (ii) Any diesel fuel or kerosene...

  10. 26 CFR 48.4082-4 - Diesel fuel and kerosene; back-up tax.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 26 Internal Revenue 16 2012-04-01 2012-04-01 false Diesel fuel and kerosene; back-up tax. 48.4082..., and Taxable Fuel Taxable Fuel § 48.4082-4 Diesel fuel and kerosene; back-up tax. (a) Imposition of tax... fuel or kerosene on which tax has not been imposed by section 4081; (ii) Any diesel fuel or kerosene...

  11. 26 CFR 48.4082-4 - Diesel fuel and kerosene; back-up tax.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 26 Internal Revenue 16 2013-04-01 2013-04-01 false Diesel fuel and kerosene; back-up tax. 48.4082..., and Taxable Fuel Taxable Fuel § 48.4082-4 Diesel fuel and kerosene; back-up tax. (a) Imposition of tax... fuel or kerosene on which tax has not been imposed by section 4081; (ii) Any diesel fuel or kerosene...

  12. 250 kV 6 mA compact Cockcroft-Walton high-voltage power supply

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ma, Zhan-Wen; Su, Xiao-Dong; Wei, Zhen

    A compact power supply system for a compact neutron generator has been developed. A 4-stage symmetrical Cockcroft-Walton circuit is adopted to produce 250 kV direct current high-voltage. A 2-stage 280 kV isolation transformer system is used to drive the ion source power supply. For a compact structure, safety, and reliability during the operation, the Cockcroft-Walton circuit and the isolation transformer system are enclosed in an epoxy vessel containing the transformer oil whose size is about ∅350 mm × 766 mm. Test results indicate that the maximum output voltage of the power supply is 282 kV, and the stability of themore » output voltage is better than 0.63% when the high voltage power supply is operated at 250 kV, 6.9 mA with the input voltage varying ±10%.« less

  13. Simulation of switching overvoltages in the mine electric power supply system

    NASA Astrophysics Data System (ADS)

    Ivanchenko, D. I.; Novozhilov, N. G.

    2017-02-01

    Overvoltages occur in mine power supply systems during switching off consumers with high inductive load, such as transformers, reactors and electrical machines. Overvoltages lead to an increase of insulation degradation rate and may cause electric faults, power outage, fire and explosion of methane and coal dust. This paper is dedicated to simulation of vacuum circuit breaker switching overvoltages in a mine power supply system by means of Simulink MATLAB. The model of the vacuum circuit breaker implements simulation of transient recovery voltage, current chopping and an electric arc. Obtained results were compared to available experimental data.

  14. Mechanization of and experience with a triplex fly-by-wire backup control system

    NASA Technical Reports Server (NTRS)

    Lock, W. P.; Petersen, W. R.; Whitman, G. B.

    1975-01-01

    A redundant three-axis analog control system was designed and developed to back up a digital fly-by-wire control system for an F-8C airplane. Forty-two flights, involving 58 hours of flight time, were flown by six pilots. The mechanization and operational experience with the backup control system, the problems involved in synchronizing it with the primary system, and the reliability of the system are discussed. The backup control system was dissimilar to the primary system, and it provided satisfactory handling through the flight envelope evaluated. Limited flight tests of a variety of control tasks showed that control was also satisfactory when the backup control system was controlled by a minimum-displacement (force) side stick. The operational reliability of the F-8 digital fly-by-wire control system was satisfactory, with no unintentional downmodes to the backup control system in flight. The ground and flight reliability of the system's components is discussed.

  15. 47 CFR 15.102 - CPU boards and power supplies used in personal computers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... computers. 15.102 Section 15.102 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Unintentional Radiators § 15.102 CPU boards and power supplies used in personal computers. (a... modifications that must be made to a personal computer, peripheral device, CPU board or power supply during...

  16. 47 CFR 15.102 - CPU boards and power supplies used in personal computers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... computers. 15.102 Section 15.102 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Unintentional Radiators § 15.102 CPU boards and power supplies used in personal computers. (a... modifications that must be made to a personal computer, peripheral device, CPU board or power supply during...

  17. 47 CFR 15.102 - CPU boards and power supplies used in personal computers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... computers. 15.102 Section 15.102 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Unintentional Radiators § 15.102 CPU boards and power supplies used in personal computers. (a... modifications that must be made to a personal computer, peripheral device, CPU board or power supply during...

  18. 47 CFR 15.102 - CPU boards and power supplies used in personal computers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... computers. 15.102 Section 15.102 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Unintentional Radiators § 15.102 CPU boards and power supplies used in personal computers. (a... modifications that must be made to a personal computer, peripheral device, CPU board or power supply during...

  19. 47 CFR 15.102 - CPU boards and power supplies used in personal computers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... computers. 15.102 Section 15.102 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Unintentional Radiators § 15.102 CPU boards and power supplies used in personal computers. (a... modifications that must be made to a personal computer, peripheral device, CPU board or power supply during...

  20. 26 CFR 48.4082-4 - Diesel fuel and kerosene; back-up tax.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Diesel fuel and kerosene; back-up tax. 48.4082-4..., and Taxable Fuel Taxable Fuel § 48.4082-4 Diesel fuel and kerosene; back-up tax. (a) Imposition of tax... fuel or kerosene on which tax has not been imposed by section 4081; (ii) Any diesel fuel or kerosene...

  1. 115. VIEW OF SOUTHWEST CORNER OF LANDLINE INSTRUMENTATION ROOM (206), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    115. VIEW OF SOUTHWEST CORNER OF LANDLINE INSTRUMENTATION ROOM (206), LSB (BLDG. 751). BATTERY RACK ON LEFT FOR BACKUP BOOSTER POWER; BATTERY RACK ON RIGHT FOR BACKUP AEROSPACE GROUND EQUIPMENT (AGE) POWER. RECTIFIER SUPPLYING PRIMARY POWER ON THE RIGHT SIDE OF THE PHOTO; BATTERY CHARGER BETWEEN RECTIFIER AND BATTERY RACKS. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  2. The Effect of Power Protection Equipment on Explosion Hazards and on the Reliability of Power Supply to Longwall Systems

    NASA Astrophysics Data System (ADS)

    Boron, Sergiusz

    2017-06-01

    Operational safety of electrical machines and equipment depends, inter alia, on the hazards resulting from their use and on the scope of applied protective measures. The use of insufficient protection against existing hazards leads to reduced operational safety, particularly under fault conditions. On the other hand, excessive (in relation to existing hazards) level of protection may compromise the reliability of power supply. This paper analyses the explosion hazard created by earth faults in longwall power supply systems and evaluates existing protection equipment from the viewpoint of its protective performance, particularly in the context of explosion hazards, and also assesses its effect on the reliability of power supply.

  3. STS-47 crew & backups pose for portrait in SLJ module at KSC during training

    NASA Image and Video Library

    1992-07-25

    S92-44303 --- STS-47 Endeavour, Orbiter Vehicle (OV) 105, crew members and back-up payload specialists, wearing clean suits, pose for a group portrait in the Spacelab Japan (SLJ) module. The team is at the Kennedy Space Center's (KSC's) Orbiter Processing Facility (OPF) to inspect SLJ configuration and OV-105 preparations. Kneeling, from left, are back-up Payload Specialist Chiaki Naito-Mukai; Mission Specialist N. Jan Davis; and backup Payload Specialist Takao Doi. Standing, from the left, are Pilot Curtis L. Brown,Jr; Payload Commander Mark C. Lee; Jerome Apt; Payload Specialist Mamoru Mohri; Commander Robert L. Gibson; Mae C. Jemison; and back-up Payload Specialist Stanely L. Koszelak. Mohri, Mukai, and Doi represent the National Space Development Agency of Japan (NASDA). View provided by KSC with alternate KSC number KSC-92PC-1647. Photo credit: NASA

  4. Investigations of DC power supplies with optoelectronic transducers and RF energy converters

    NASA Astrophysics Data System (ADS)

    Guzowski, B.; Gozdur, R.; Bernacki, L.; Lakomski, M.

    2016-04-01

    Fiber Distribution Cabinets (FDC) monitoring systems are increasingly popular. However it is difficult to realize such system in passive FDC, due to lack of source of power supply. In this paper investigation of four different DC power supplies with optoelectronic transducers is described. Two converters: photovoltaic power converter and PIN photodiode can convert the light transmitted through the optical fiber to electric energy. Solar cell and antenna RF-PCB are also tested. Results presented in this paper clearly demonstrate that it is possible to build monitoring system in passive FDC. During the tests maximum obtained output power was 11 mW. However all converters provided enough power to excite 32-bit microcontroller with ARM-cores and digital thermometer.

  5. 25. Perimeter acquisition radar building room #2M4, (mezzanine), power supply ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Perimeter acquisition radar building room #2M4, (mezzanine), power supply room; computer power supply on left and water flow on right. This room is directly below data processing area (room #318). Sign on right reads: High purity water digital rack - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND

  6. Multiple output power supply circuit for an ion engine with shared upper inverter

    NASA Technical Reports Server (NTRS)

    Cardwell, Jr., Gilbert I. (Inventor); Phelps, Thomas K. (Inventor)

    2001-01-01

    A power supply circuit for an ion engine suitable for a spacecraft is coupled to a bus having a bus input and a bus return. The power supply circuit has a first primary winding of a first transformer. An upper inverter circuit is coupled to the bus input and the first primary winding. The power supply circuit further includes a first lower inverter circuit coupled to the bus return and the first primary winding. The second primary winding of a second transformer is coupled to the upper inverter circuit. A second lower inverter circuit is coupled to the bus return and the second primary winding.

  7. POWER SUPPLY CONTROL AND MONITORING FOR THE SNS RING AND TRANSPORT SYSTEM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LAMBIASE,R.; OERTER,B.; PENG,S.

    2001-06-28

    There are approximately 300 magnet power supplies in the SNS accumulator ring and transport lines. Control and monitoring of the these converters will be primarily accomplished with a new Power Supply Interface and Controller (PSI/PSC) system developed for the SNS project. This PSI/PSC system provides all analog and digital commands and status readbacks in one fiber isolated module. With a maximum rate of 10KHz, the PSI/PSC must be supplemented with higher speed systems for the wide bandwidth pulsed injection supplies, and the even wider bandwidth extraction kickers. This paper describes the implementation of this PSI/PSC system, which was developed throughmore » an industry/laboratory collaboration, and the supplementary equipment used to support the wider bandwidth pulsed supplies.« less

  8. Determination of appropriate DC voltage for switched mode power supply (SMPS) loads

    NASA Astrophysics Data System (ADS)

    Setiawan, Eko Adhi; Setiawan, Aiman; Purnomo, Andri; Djamal, Muchlishah Hadi

    2017-03-01

    Nowadays, most of modern and efficient household electronic devices operated based on Switched Mode Power Supply (SMPS) technology which convert AC voltage from the grid to DC voltage. Based on theory and experiment, SMPS loads could be supplied by DC voltage. However, the DC voltage rating to energize electronic home appliances is not standardized yet. This paper proposed certain method to determine appropriate DC voltage, and investigated comparison of SMPS power consumption which is supplied from AC and DC voltage. To determine the appropriate DC voltage, lux value of several lamps which have same specification energized by using AC voltage and the results is using as reference. Then, the lamps were supplied by various DC voltage to obtain the trends of the lux value to the applied DC voltage. After that, by using the trends and the reference lux value, the appropriate DC voltage can be determined. Furthermore, the power consumption on home appliances such as mobile phone, laptop and personal computer by using AC voltage and the appropriate DC voltage were conducted. The results show that the total power consumption of AC system is higher than DC system. The total power (apparent power) consumed by the lamp, mobile phone and personal computer which operated in 220 VAC were 6.93 VA, 34.31 VA and 105.85 VA respectively. On the other hand, under 277 VDC the load consumption were 5.83 W, 19.11 W and 74.46 W respectively.

  9. Markov switching of the electricity supply curve and power prices dynamics

    NASA Astrophysics Data System (ADS)

    Mari, Carlo; Cananà, Lucianna

    2012-02-01

    Regime-switching models seem to well capture the main features of power prices behavior in deregulated markets. In a recent paper, we have proposed an equilibrium methodology to derive electricity prices dynamics from the interplay between supply and demand in a stochastic environment. In particular, assuming that the supply function is described by a power law where the exponent is a two-state strictly positive Markov process, we derived a regime switching dynamics of power prices in which regime switches are induced by transitions between Markov states. In this paper, we provide a dynamical model to describe the random behavior of power prices where the only non-Brownian component of the motion is endogenously introduced by Markov transitions in the exponent of the electricity supply curve. In this context, the stochastic process driving the switching mechanism becomes observable, and we will show that the non-Brownian component of the dynamics induced by transitions from Markov states is responsible for jumps and spikes of very high magnitude. The empirical analysis performed on three Australian markets confirms that the proposed approach seems quite flexible and capable of incorporating the main features of power prices time-series, thus reproducing the first four moments of log-returns empirical distributions in a satisfactory way.

  10. ESB-based Sensor Web integration for the prediction of electric power supply system vulnerability.

    PubMed

    Stoimenov, Leonid; Bogdanovic, Milos; Bogdanovic-Dinic, Sanja

    2013-08-15

    Electric power supply companies increasingly rely on enterprise IT systems to provide them with a comprehensive view of the state of the distribution network. Within a utility-wide network, enterprise IT systems collect data from various metering devices. Such data can be effectively used for the prediction of power supply network vulnerability. The purpose of this paper is to present the Enterprise Service Bus (ESB)-based Sensor Web integration solution that we have developed with the purpose of enabling prediction of power supply network vulnerability, in terms of a prediction of defect probability for a particular network element. We will give an example of its usage and demonstrate our vulnerability prediction model on data collected from two different power supply companies. The proposed solution is an extension of the GinisSense Sensor Web-based architecture for collecting, processing, analyzing, decision making and alerting based on the data received from heterogeneous data sources. In this case, GinisSense has been upgraded to be capable of operating in an ESB environment and combine Sensor Web and GIS technologies to enable prediction of electric power supply system vulnerability. Aside from electrical values, the proposed solution gathers ambient values from additional sensors installed in the existing power supply network infrastructure. GinisSense aggregates gathered data according to an adapted Omnibus data fusion model and applies decision-making logic on the aggregated data. Detected vulnerabilities are visualized to end-users through means of a specialized Web GIS application.

  11. ESB-Based Sensor Web Integration for the Prediction of Electric Power Supply System Vulnerability

    PubMed Central

    Stoimenov, Leonid; Bogdanovic, Milos; Bogdanovic-Dinic, Sanja

    2013-01-01

    Electric power supply companies increasingly rely on enterprise IT systems to provide them with a comprehensive view of the state of the distribution network. Within a utility-wide network, enterprise IT systems collect data from various metering devices. Such data can be effectively used for the prediction of power supply network vulnerability. The purpose of this paper is to present the Enterprise Service Bus (ESB)-based Sensor Web integration solution that we have developed with the purpose of enabling prediction of power supply network vulnerability, in terms of a prediction of defect probability for a particular network element. We will give an example of its usage and demonstrate our vulnerability prediction model on data collected from two different power supply companies. The proposed solution is an extension of the GinisSense Sensor Web-based architecture for collecting, processing, analyzing, decision making and alerting based on the data received from heterogeneous data sources. In this case, GinisSense has been upgraded to be capable of operating in an ESB environment and combine Sensor Web and GIS technologies to enable prediction of electric power supply system vulnerability. Aside from electrical values, the proposed solution gathers ambient values from additional sensors installed in the existing power supply network infrastructure. GinisSense aggregates gathered data according to an adapted Omnibus data fusion model and applies decision-making logic on the aggregated data. Detected vulnerabilities are visualized to end-users through means of a specialized Web GIS application. PMID:23955435

  12. Novel pulsed switched power supply for a fast field cycling NMR spectrometer.

    PubMed

    Sousa, D M; Fernandes, P A L; Marques, G D; Ribeiro, A C; Sebastião, P J

    2004-01-01

    In this paper, we outline the operating principles of a pulsed switched power supply for a fast field-cycling nuclear magnetic resonance spectrometer. The power supply uses a variant of a four-quadrant chopper with a duty cycle that defines the average output current. With this topology only two semiconductors are necessary to drive hundreds of amperes with an output power of several kilowatts. The output current ripple has a well-defined shape that can be reduced to acceptable values by a careful design of the semiconductors' controlling circuits and drivers. A power supply prototype was tested with a home build air-core magnet operating with fields between 0 and 0.21 T. The system is computer controlled using pulse generator and data acquisition PC cards, and specific user-friendly home-developed software. A comparative proton relaxometry study in two well-known liquid crystal compounds 5CB and MBBA was performed to check the reproducibility of the T1 measurements.

  13. Expedition 14 Crew and Backup Crew Training

    NASA Image and Video Library

    2006-05-24

    JSC2006-E-20053 (24 May 2006) --- Astronaut Clayton C. Anderson, Expedition 14 backup flight engineer, participates in Journals experiment overview training in the Flight Operations Facility at Johnson Space Center. This type of training is a presentation format regarding the experiment objectives and tools. Training instructor Lindsay Kirschner assisted Anderson.

  14. Implementation of an ASP model offsite backup archive for clinical images utilizing Internet 2

    NASA Astrophysics Data System (ADS)

    Liu, Brent J.; Chao, Sander S.; Documet, Jorge; Lee, Jasper; Lee, Michael; Topic, Ian; Williams, Lanita

    2005-04-01

    With the development of PACS technology and an increasing demand by medical facilities to become filmless, there is a need for a fast and efficient method of providing data backup for disaster recovery and downtime scenarios. At the Image Processing Informatics Lab (IPI), an ASP Backup Archive was developed using a fault-tolerant server with a T1 connection to serve the PACS at the St. John's Health Center (SJHC) Santa Monica, California. The ASP archive server has been in clinical operation for more than 18 months, and its performance was presented at this SPIE Conference last year. This paper extends the ASP Backup Archive to serve the PACS at the USC Healthcare Consultation Center II (HCC2) utilizing an Internet2 connection. HCC2 is a new outpatient facility that recently opened in April 2004. The Internet2 connectivity between USC's HCC2 and IPI has been established for over one year. There are two novelties of the current ASP model: 1) Use of Internet2 for daily clinical operation, and 2) Modifying the existing backup archive to handle two sites in the ASP model. This paper presents the evaluation of the ASP Backup Archive based on the following two criteria: 1) Reliability and performance of the Internet2 connection between HCC2 and IPI using DICOM image transfer in a clinical environment, and 2) Ability of the ASP Fault-Tolerant backup archive to support two separate clinical PACS sites simultaneously. The performances of using T1 and Internet2 at the two different sites are also compared.

  15. 75 FR 3460 - Indian River Power Supply, LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 12462-020] Indian River Power Supply, LLC; Notice of Availability of Environmental Assessment January 13, 2010. In accordance..., Massachusetts. In the application, Indian River Power Supply, LLC (exemptee) proposes to replace the project's...

  16. A new type of accelerator power supply based on voltage-type space vector PWM rectification technology

    NASA Astrophysics Data System (ADS)

    Wu, Fengjun; Gao, Daqing; Shi, Chunfeng; Huang, Yuzhen; Cui, Yuan; Yan, Hongbin; Zhang, Huajian; Wang, Bin; Li, Xiaohui

    2016-08-01

    To solve the problems such as low input power factor, a large number of AC current harmonics and instable DC bus voltage due to the diode or thyristor rectifier used in an accelerator power supply, particularly in the Heavy Ion Research Facility in Lanzhou-Cooler Storage Ring (HIRFL-CSR), we designed and built up a new type of accelerator power supply prototype base on voltage-type space vector PWM (SVPWM) rectification technology. All the control strategies are developed in TMS320C28346, which is a digital signal processor from TI. The experimental results indicate that an accelerator power supply with a SVPWM rectifier can solve the problems above well, and the output performance such as stability, tracking error and ripple current meet the requirements of the design. The achievement of prototype confirms that applying voltage-type SVPWM rectification technology in an accelerator power supply is feasible; and it provides a good reference for design and build of this new type of power supply.

  17. Quasi Path Restoration: A post-failure recovery scheme over pre-allocated backup resource for elastic optical networks

    NASA Astrophysics Data System (ADS)

    Yadav, Dharmendra Singh; Babu, Sarath; Manoj, B. S.

    2018-03-01

    Spectrum conflict during primary and backup routes assignment in elastic optical networks results in increased resource consumption as well as high Bandwidth Blocking Probability. In order to avoid such conflicts, we propose a new scheme, Quasi Path Restoration (QPR), where we divide the available spectrum into two: (1) primary spectrum (for primary routes allocation) and (2) backup spectrum (for rerouting the data on link failures). QPR exhibits three advantages over existing survivable strategies such as Shared Path Protection (SPP), Primary First Fit Backup Last Fit (PFFBLF), Jointly Releasing and re-establishment Defragmentation SPP (JRDSSPP), and Path Restoration (PR): (1) the conflict between primary and backup spectrum during route assignment is completely eliminated, (2) upon a link failure, connection recovery requires less backup resources compared to SPP, PFFBLF, and PR, and (3) availability of the same backup spectrum on each link improves the recovery guarantee. The performance of our scheme is analyzed with different primary backup spectrum partitions on varying connection-request demands and number of frequency slots. Our results show that QPR provides better connection recovery guarantee and Backup Resources Utilization (BRU) compared to bandwidth recovery of PR strategy. In addition, we compare QPR with Shared Path Protection and Primary First-Fit Backup Last Fit strategies in terms of Bandwidth Blocking Probability (BBP) and average frequency slots per connection request. Simulation results show that BBP of SPP, PFFBLF, and JRDSPP varies between 18.59% and 14.42%, while in QPR, BBP ranges from 2.55% to 17.76% for Cost239, NSFNET, and ARPANET topologies. Also, QPR provides bandwidth recovery between 93.61% and 100%, while in PR, the recovery ranges from 86.81% to 98.99%. It is evident from our analysis that QPR provides a reasonable trade-off between bandwidth blocking probability and connection recoverability.

  18. A high voltage power supply for the AE-C and D low energy electron experiment

    NASA Technical Reports Server (NTRS)

    Gillis, J. A.

    1974-01-01

    A description is given of the electrical and mechanical design and operation of high voltage power supplies for space flight use. The supply was used to generate the spiraltron high voltage for low energy electron experiment on AE-C and D. Two versions of the supply were designed and built; one design is referred to as the low power version (AE-C) and the other as the high power version (AE-D). Performance is discussed under all operating conditions.

  19. 33 CFR 150.710 - What are the requirements for supplying power to aids to navigation?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... supplying power to aids to navigation? 150.710 Section 150.710 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Aids to Navigation § 150.710 What are the requirements for supplying power to aids to navigation? The power of all...

  20. 33 CFR 150.710 - What are the requirements for supplying power to aids to navigation?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... supplying power to aids to navigation? 150.710 Section 150.710 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Aids to Navigation § 150.710 What are the requirements for supplying power to aids to navigation? The power of all...

  1. 33 CFR 150.710 - What are the requirements for supplying power to aids to navigation?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... supplying power to aids to navigation? 150.710 Section 150.710 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Aids to Navigation § 150.710 What are the requirements for supplying power to aids to navigation? The power of all...

  2. Influence of power supply on the generation of ozone and degradation of phenol in a surface discharge reactor

    NASA Astrophysics Data System (ADS)

    Zhao, Yan; Shang, Kefeng; Duan, Lijuan; Li, Yue; An, Jiutao; Zhang, Chunyang; Lu, Na; Li, Jie; Wu, Yan

    2013-03-01

    A surface Dielectric Barrier Discharge (DBD) reactor was utilized to degrade phenol in water. Different power supplies applied to the DBD reactor affect the discharge modes, the formation of chemically active species and thus the removal efficiency of pollutants. It is thus important to select an optimized power supply for the DBD reactor. In this paper, the influence of the types of power supplies including alternate current (AC) and bipolar pulsed power supply on the ozone generation in a surface discharge reactor was measured. It was found that compared with bipolar pulsed power supply, higher energy efficiency of O3 generation was obtained when DBD reactor was supplied with 50Hz AC power supply. The highest O3 generation was approximate 4 mg kJ-1 moreover, COD removal efficiency of phenol wastewater reached 52.3% after 3 h treatment under an AC peak voltage of 2.6 kV.

  3. 7 CFR 1717.857 - Refinancing of existing secured debt-distribution and power supply borrowers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Refinancing of existing secured debt-distribution and power supply borrowers. 1717.857 Section 1717.857 Agriculture Regulations of the Department of... Private Financing § 1717.857 Refinancing of existing secured debt—distribution and power supply borrowers...

  4. 14 CFR 121.641 - Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Flag operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Flag operations. 121.641 Section 121.641 Aeronautics and Space FEDERAL AVIATION... Flight Release Rules § 121.641 Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Flag...

  5. 14 CFR 121.641 - Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Flag operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Flag operations. 121.641 Section 121.641 Aeronautics and Space FEDERAL AVIATION... Flight Release Rules § 121.641 Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Flag...

  6. 14 CFR 121.643 - Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Supplemental operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Supplemental operations. 121.643 Section 121.643 Aeronautics and Space FEDERAL AVIATION... Flight Release Rules § 121.643 Fuel supply: Nonturbine and turbo-propeller-powered airplanes...

  7. 14 CFR 121.643 - Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Supplemental operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Supplemental operations. 121.643 Section 121.643 Aeronautics and Space FEDERAL AVIATION... Flight Release Rules § 121.643 Fuel supply: Nonturbine and turbo-propeller-powered airplanes...

  8. A flexible super-capacitive solid-state power supply for miniature implantable medical devices.

    PubMed

    Meng, Chuizhou; Gall, Oren Z; Irazoqui, Pedro P

    2013-12-01

    We present a high-energy local power supply based on a flexible and solid-state supercapacitor for miniature wireless implantable medical devices. Wireless radio-frequency (RF) powering recharges the supercapacitor through an antenna with an RF rectifier. A power management circuit for the super-capacitive system includes a boost converter to increase the breakdown voltage required for powering device circuits, and a parallel conventional capacitor as an intermediate power source to deliver current spikes during high current transients (e.g., wireless data transmission). The supercapacitor has an extremely high area capacitance of ~1.3 mF/mm(2), and is in the novel form of a 100 μm-thick thin film with the merit of mechanical flexibility and a tailorable size down to 1 mm(2) to meet various clinical dimension requirements. We experimentally demonstrate that after fully recharging the capacitor with an external RF powering source, the supercapacitor-based local power supply runs a full system for electromyogram (EMG) recording that consumes ~670 μW with wireless-data-transmission functionality for a period of ~1 s in the absence of additional RF powering. Since the quality of wireless powering for implantable devices is sensitive to the position of those devices within the RF electromagnetic field, this high-energy local power supply plays a crucial role in providing continuous and reliable power for medical device operations.

  9. View of backup payload specialist Robert Thirsk during Zero-G training

    NASA Image and Video Library

    1984-07-16

    S84-37532 (18 July 1984) --? Robert B. Thirsk, backup payload specialist for 41-G appears to be shaking hands with an unoccupied extravehicular mobility unit (EMU) during a familiarization flight aboard NASA?s KC-135 aircraft. Thirsk, representing Canada?s National Research Council (NRC), serves as backup to Marc Garneau on the seven-member crew for Challenger?s October 1984 flight. This aircraft is used extensively for training and exposing Shuttle crewmembers to weightlessness as well as for evaluation of equipment and experiments scheduled for future flights.

  10. Piezoelectric transformer and modular connections for high power and high voltage power supplies

    NASA Technical Reports Server (NTRS)

    Vazquez Carazo, Alfredo (Inventor)

    2006-01-01

    A modular design for combining piezoelectric transformers is provided for high voltage and high power conversion applications. The input portions of individual piezoelectric transformers are driven for a single power supply. This created the vibration and the conversion of electrical to electrical energy from the input to the output of the transformers. The output portions of the single piezoelectric transformers are combining in series and/or parallel to provide multiple outputs having different rating of voltage and current.

  11. Hybrid power supplies: A capacitor-assisted battery

    NASA Astrophysics Data System (ADS)

    Catherino, Henry A.; Burgel, Joseph F.; Shi, Peter L.; Rusek, Andrew; Zou, Xiulin

    A hybrid electrochemical power supply is a concept that circumvents the need for designing any single power source to meet some extraordinary application requirement. A hybrid allows using components designed for near optimal operation without having to make unnecessary performance sacrifices. In many cases some additional synergistic effects appear. In this study, an electrochemical capacitor was employed as a power assist for a battery. An engine starting load was numerically modeled in the time domain and simulations were carried out. Actual measurements were then taken on the cranking of a diesel engine removed from a 5.0-tonne military truck and cranked in an environmental chamber. The cranking currents delivered by each power source were measured in the accessible current loops. This permitted the model parameters to be identified and, by doing that, studies using the analytical model demonstrated the merit of this hybrid application. The general system response of the battery/capacitor configuration was then modeled as a function of temperature. Doing this revealed electrical the interaction between the hybrid components. This study illustrates another case for advocating hybridized power systems.

  12. Regulated-current dc power supply for gaseous-discharge lamps

    NASA Technical Reports Server (NTRS)

    Freeman, W.; Huguenin, D.

    1970-01-01

    Controlled current source having a high output resistance feeds continuous-flow hydrogen lamps in vacuum-ultraviolet photometric equipment. The power supply, also used with low-pressure sealed lamps, has a short recovery time and smooth regulation without overshoot.

  13. Back-Up/ Peak Shaving Fuel Cell System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Staudt, Rhonda L.

    2008-05-28

    This Final Report covers the work executed by Plug Power from 8/11/03 – 10/31/07 statement of work for Topic 2: advancing the state of the art of fuel cell technology with the development of a new generation of commercially viable, stationary, Back-up/Peak-Shaving fuel cell systems, the GenCore II. The Program cost was $7.2 M with the Department of Energy share being $3.6M and Plug Power’s share being $3.6 M. The Program started in August of 2003 and was scheduled to end in January of 2006. The actual program end date was October of 2007. A no cost extension was grated.more » The Department of Energy barriers addressed as part of this program are: Technical Barriers for Distributed Generation Systems: o Durability o Power Electronics o Start up time Technical Barriers for Fuel Cell Components: o Stack Material and Manufacturing Cost o Durability o Thermal and water management Background The next generation GenCore backup fuel cell system to be designed, developed and tested by Plug Power under the program is the first, mass-manufacturable design implementation of Plug Power’s GenCore architected platform targeted for battery and small generator replacement applications in the telecommunications, broadband and UPS markets. The next generation GenCore will be a standalone, H2 in-DC-out system. In designing the next generation GenCore specifically for the telecommunications market, Plug Power is teaming with BellSouth Telecommunications, Inc., a leading industry end user. The final next generation GenCore system is expected to represent a market-entry, mass-manufacturable and economically viable design. The technology will incorporate: • A cost-reduced, polymer electrolyte membrane (PEM) fuel cell stack tailored to hydrogen fuel use • An advanced electrical energy storage system • A modular, scalable power conditioning system tailored to market requirements • A scaled-down, cost-reduced balance of plant (BOP) • Network Equipment Building Standards

  14. 30 CFR 56.14132 - Horns and backup alarms.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....14132 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Machinery and Equipment Safety Devices and Maintenance Requirements § 56.14132 Horns and backup alarms. (a) Manually...

  15. 30 CFR 56.14132 - Horns and backup alarms.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....14132 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Machinery and Equipment Safety Devices and Maintenance Requirements § 56.14132 Horns and backup alarms. (a) Manually...

  16. 33 CFR 150.710 - What are the requirements for supplying power to aids to navigation?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false What are the requirements for supplying power to aids to navigation? 150.710 Section 150.710 Navigation and Navigable Waters COAST GUARD... § 150.710 What are the requirements for supplying power to aids to navigation? The power of all...

  17. 33 CFR 150.710 - What are the requirements for supplying power to aids to navigation?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false What are the requirements for supplying power to aids to navigation? 150.710 Section 150.710 Navigation and Navigable Waters COAST GUARD... § 150.710 What are the requirements for supplying power to aids to navigation? The power of all...

  18. Magnetic susceptibility well-logging unit with single power supply thermoregulation system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seeley, R. L.

    1985-11-05

    The magnetic susceptibility well-logging unit with single power supply thermoregulation system provides power from a single surface power supply over a well-logging cable to an integrated circuit voltage regulator system downhole. This voltage regulator system supplies regulated voltages to a temperature control system and also to a Maxwell bridge sensing unit which includes the solenoid of a magnetic susceptibility probe. The temperature control system is provided with power from the voltage regulator system and operates to permit one of several predetermined temperatures to be chosen, and then operates to maintain the solenoid of a magnetic susceptibility probe at this chosenmore » temperature. The temperature control system responds to a temperature sensor mounted upon the probe solenoid to cause resistance heaters concentrically spaced from the probe solenoid to maintain the chosen temperature. A second temperature sensor on the probe solenoid provides a temperature signal to a temperature transmitting unit, which initially converts the sensed temperature to a representative voltage. This voltage is then converted to a representative current signal which is transmitted by current telemetry over the well logging cable to a surface electronic unit which then reconverts the current signal to a voltage signal.« less

  19. Basis for the power supply reliability study of the 1 MW neutron source

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGhee, D.G.; Fathizadeh, M.

    1993-07-01

    The Intense Pulsed Neutron Source (IPNS) upgrade to 1 MW requires new power supply designs. This paper describes the tools and the methodology needed to assess the reliability of the power supplies. Both the design and operation of the power supplies in the synchrotron will be taken into account. To develop a reliability budget, the experiments to be conducted with this accelerator are reviewed, and data is collected on the number and duration of interruptions possible before an experiment is required to start over. Once the budget is established, several accelerators of this type will be examined. The budget ismore » allocated to the different accelerator systems based on their operating experience. The accelerator data is usually in terms of machine availability and system down time. It takes into account mean time to failure (MTTF), time to diagnose, time to repair or replace the failed components, and time to get the machine back online. These estimated times are used as baselines for the design. Even though we are in the early stage of design, available data can be analyzed to estimate the MTTF for the power supplies.« less

  20. Design and implementation of improved LsCpLp resonant circuit for power supply for high-power electromagnetic acoustic transducer excitation

    NASA Astrophysics Data System (ADS)

    Zao, Yongming; Ouyang, Qi; Chen, Jiawei; Zhang, Xinglan; Hou, Shuaicheng

    2017-08-01

    This paper investigates the design and implementation of an improved series-parallel inductor-capacitor-inductor (LsCpLp) resonant circuit power supply for excitation of electromagnetic acoustic transducers (EMATs). The main advantage of the proposed resonant circuit is the absence of a high-permeability dynamic transformer. A high-frequency pulsating voltage gain can be achieved through a double resonance phenomenon. Both resonant tailing behavior and higher harmonics are suppressed by the improved resonant circuit, which also contributes to the generation of ultrasonic waves. Additionally, the proposed circuit can realize impedance matching and can also optimize the transduction efficiency. The complete design and implementation procedure for the power supply is described and has been validated by implementation of the proposed power supply to drive a portable EMAT. The circuit simulation results show close agreement with the experimental results and thus confirm the validity of the proposed topology. The proposed circuit is suitable for use as a portable EMAT excitation power supply that is fed by a low-voltage source.

  1. Design of a -1 MV dc UHV power supply for ITER NBI

    NASA Astrophysics Data System (ADS)

    Watanabe, K.; Yamamoto, M.; Takemoto, J.; Yamashita, Y.; Dairaku, M.; Kashiwagi, M.; Taniguchi, M.; Tobari, H.; Umeda, N.; Sakamoto, K.; Inoue, T.

    2009-05-01

    Procurement of a dc -1 MV power supply system for the ITER neutral beam injector (NBI) is shared by Japan and the EU. The Japan Atomic Energy Agency as the Japan Domestic Agency (JADA) for ITER contributes to the procurement of dc -1 MV ultra-high voltage (UHV) components such as a dc -1 MV generator, a transmission line and a -1 MV insulating transformer for the ITER NBI power supply. The inverter frequency of 150 Hz in the -1 MV power supply and major circuit parameters have been proposed and adopted in the ITER NBI. The dc UHV insulation has been carefully designed since dc long pulse insulation is quite different from conventional ac insulation or dc short pulse systems. A multi-layer insulation structure of the transformer for a long pulse up to 3600 s has been designed with electric field simulation. Based on the simulation the overall dimensions of the dc UHV components have been finalized. A surge energy suppression system is also essential to protect the accelerator from electric breakdowns. The JADA contributes to provide an effective surge suppression system composed of core snubbers and resistors. Input energy into the accelerator from the power supply can be reduced to about 20 J, which satisfies the design criteria of 50 J in total in the case of breakdown at -1 MV.

  2. Experience using individually supplied heater rods in critical power testing of advanced BWR fuel

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Majed, M.; Morback, G.; Wiman, P.

    1995-09-01

    The ABB Atom FRIGG loop located in Vasteras Sweden has during the last six years given a large experience of critical power measurements for BWR fuel designs using indirectly heated rods with individual power supply. The loop was built in the sixties and designed for maximum 100 bar pressure. Testing up to the mid eighties was performed with directly heated rods using a 9 MW, 80 kA power supply. Providing test data to develop critical power correlations for BWR fuel assemblies requires testing with many radial power distributions over the full range of hydraulic conditions. Indirectly heated rods give largemore » advantages for the testing procedure, particularly convenient for variation of individual rod power. A test method being used at Stern Laboratories (formerly Westinghouse Canada) since the early sixties, allows one fuel assembly to simulate all required radial power distributions. This technique requires reliable indirectly heated rods with independently controlled power supplies and uses insulated electric fuel rod simulators with built-in instrumentation. The FRIGG loop was adapted to this system in 1987. A 4MW power supply with 10 individual units was then installed, and has since been used for testing 24 and 25 rod bundles simulating one subbundle of SVEA-96/100 type fuel assemblies. The experience with the system is very good, as being presented, and it is selected also for a planned upgrading of the facility to 15 MW.« less

  3. 14 CFR 125.375 - Fuel supply: Nonturbine and turbopropeller-powered airplanes.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...-powered airplanes. 125.375 Section 125.375 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... AND OPERATIONS CERTIFICATION AND OPERATIONS: AIRPLANES HAVING A SEATING CAPACITY OF 20 OR MORE... AIRCRAFT Flight Release Rules § 125.375 Fuel supply: Nonturbine and turbopropeller-powered airplanes. (a...

  4. 14 CFR 125.375 - Fuel supply: Nonturbine and turbopropeller-powered airplanes.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...-powered airplanes. 125.375 Section 125.375 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... AND OPERATIONS CERTIFICATION AND OPERATIONS: AIRPLANES HAVING A SEATING CAPACITY OF 20 OR MORE... AIRCRAFT Flight Release Rules § 125.375 Fuel supply: Nonturbine and turbopropeller-powered airplanes. (a...

  5. 14 CFR 125.375 - Fuel supply: Nonturbine and turbopropeller-powered airplanes.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...-powered airplanes. 125.375 Section 125.375 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... AND OPERATIONS CERTIFICATION AND OPERATIONS: AIRPLANES HAVING A SEATING CAPACITY OF 20 OR MORE... AIRCRAFT Flight Release Rules § 125.375 Fuel supply: Nonturbine and turbopropeller-powered airplanes. (a...

  6. 14 CFR 125.375 - Fuel supply: Nonturbine and turbopropeller-powered airplanes.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...-powered airplanes. 125.375 Section 125.375 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... AND OPERATIONS CERTIFICATION AND OPERATIONS: AIRPLANES HAVING A SEATING CAPACITY OF 20 OR MORE... AIRCRAFT Flight Release Rules § 125.375 Fuel supply: Nonturbine and turbopropeller-powered airplanes. (a...

  7. 14 CFR 125.375 - Fuel supply: Nonturbine and turbopropeller-powered airplanes.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...-powered airplanes. 125.375 Section 125.375 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... AND OPERATIONS CERTIFICATION AND OPERATIONS: AIRPLANES HAVING A SEATING CAPACITY OF 20 OR MORE... AIRCRAFT Flight Release Rules § 125.375 Fuel supply: Nonturbine and turbopropeller-powered airplanes. (a...

  8. CBERS-03 Satellite Power Supply Subsystem

    NASA Astrophysics Data System (ADS)

    Almeida, Mario C. P.; Bo, Han

    2005-05-01

    The second China Brazil Earth Resources Satellite, CBERS-2, was successfully launched on October 21st, 2003 from the Taiyuan Satellite Launch Center, China, through a Long March 4B launcher.The cooperation between China and Brazil for the construction of CBERS satellites is a continued mission and the governments of both countries are committed to building CBERS-3 for the continued and improved services started with the launch of CBERS-1 satellite [1]. Given to its success, the CBERS program is considered as a model for other joint scientific and technological projects between those two countries. CBERS-3 will have new instruments with higher resolution and higher power consumption requirements. The Power Supply Subsystem of CBERS-3 will be a scaled-up version of the one used in the previous missions, but will also present some innovations now possible due to improvements in components, technologies and materials. The modular concept used in the previous design, and repeated in this new mission, will allow the development of the new power subsystem equipments in a straightforward manner.

  9. Flight evaluation of a hydromechanical backup control for the digital electronic engine control system in an F100 engine

    NASA Technical Reports Server (NTRS)

    Walsh, K. R.; Burcham, F. W.

    1984-01-01

    The backup control (BUC) features, the operation of the BUC system, the BUC control logic, and the BUC flight test results are described. The flight test results include: (1) transfers to the BUC at military and maximum power settings; (2) a military power acceleration showing comparisons bvetween flight and simulation for BUC and primary modes; (3) steady-state idle power showing idle compressor speeds at different flight conditions; and (4) idle-to-military power BUC transients showing where cpmpressor stalls occurred for different ramp rates and idle speeds. All the BUC transfers which occur during the DEEC flight program are initiated by the pilot. Automatic transfers to the BUC do not occur.

  10. Standby-battery autonomy versus power quality

    NASA Astrophysics Data System (ADS)

    Bitterlin, Ian F.

    Batteries are used in a wide variety of applications as an energy store to bridge gaps in the primary source of supplied power for a given period of time. In some cases this bridging time, the battery's "autonomy", is fixed by local legislation but it is also often set by historically common practices. However, even if common practice dictates a long autonomy time, we are entering a new era of "cost and benefit realism" underpinned by environmentally friendly policies and we should challenge these historical practices at every opportunity if it can lead to resource and cost savings. In some cases the application engineer has no choice in the design autonomy; either follow a piece of local legislation (e.g. 4 h autonomy for a "life safety" application), or actually work out what is needed! An example of the latter would be for a remote site, off-grid, using integrated wind/solar power (without emergency generator back-up) where you may have to design-in several days' battery autonomy. This short paper proposes that a battery's autonomy should be related to the time expected for the system to be without the primary power source, balanced by the capital costs and commercial risk of power failure. To discuss this we shall consider the factors in selecting the autonomy time and other related aspects for high voltage battery systems used in facility-wide uninterruptible power supply (UPS) systems.

  11. Ceramic backup ring prevents undesirable weld-metal buildup

    NASA Technical Reports Server (NTRS)

    Leonard, G. E.

    1971-01-01

    Removable ceramic backup material butted against weld zone back prevents weld metal buildup at that site. Method is successful with manual tungsten-inert gas /TIG/ welding of 316 corrosion resistant steel /CRES/ pieces with 0.76 cm throat diameter and 1.57 cm pipe internal diameter.

  12. 5. VIEW OF POWER SUPPLY EQUIPMENT SHOWING ELECTRIC MOTER AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. VIEW OF POWER SUPPLY EQUIPMENT SHOWING ELECTRIC MOTER AND DRIVE & FLYWHEELS WITH BELT TRANSMISSION. ORIGINALLY STEAM DRIVEN - Anchor (Stangl) Pottery Company, 940 New York Avenue, Trenton, Mercer County, NJ

  13. Computerized power supply analysis: State equation generation and terminal models

    NASA Technical Reports Server (NTRS)

    Garrett, S. J.

    1978-01-01

    To aid engineers that design power supply systems two analysis tools that can be used with the state equation analysis package were developed. These tools include integration routines that start with the description of a power supply in state equation form and yield analytical results. The first tool uses a computer program that works with the SUPER SCEPTRE circuit analysis program and prints the state equation for an electrical network. The state equations developed automatically by the computer program are used to develop an algorithm for reducing the number of state variables required to describe an electrical network. In this way a second tool is obtained in which the order of the network is reduced and a simpler terminal model is obtained.

  14. Development of a Portable AC/DC Welding Power Supply Module

    DTIC Science & Technology

    1975-03-01

    REPORT DATE MAR 1975 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE Development of a Portable AC /DC Welding Power Supply...achieved. Additional bypass capacitors were added to reduce further switch heating and voltage transients. November AC welding was achieved with...Investigate the conversion of inversion frequency back to 60 Hz for AC welding. 4) Investigate a 120V single phase mini supply. VI I Objectives A) Goals

  15. Mathematical defense method of networked servers with controlled remote backups

    NASA Astrophysics Data System (ADS)

    Kim, Song-Kyoo

    2006-05-01

    The networked server defense model is focused on reliability and availability in security respects. The (remote) backup servers are hooked up by VPN (Virtual Private Network) with high-speed optical network and replace broken main severs immediately. The networked server can be represent as "machines" and then the system deals with main unreliable, spare, and auxiliary spare machine. During vacation periods, when the system performs a mandatory routine maintenance, auxiliary machines are being used for back-ups; the information on the system is naturally delayed. Analog of the N-policy to restrict the usage of auxiliary machines to some reasonable quantity. The results are demonstrated in the network architecture by using the stochastic optimization techniques.

  16. 10 CFR Appendix Z to Subpart B of... - Uniform Test Method for Measuring the Energy Consumption of External Power Supplies

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... operation when the external power supply is connected to the main electricity supply and the output is (or... external power supply is connected to the main electricity supply and the output is (or “all outputs are... switches, in which the external power supply is (1) connected to the main electricity supply; (2) the...

  17. 10 CFR Appendix Z to Subpart B of... - Uniform Test Method for Measuring the Energy Consumption of External Power Supplies

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... operation when the external power supply is connected to the main electricity supply and the output is (or... external power supply is connected to the main electricity supply and the output is (or “all outputs are... switches, in which the external power supply is (1) connected to the main electricity supply; (2) the...

  18. 10 CFR Appendix Z to Subpart B of... - Uniform Test Method for Measuring the Energy Consumption of External Power Supplies

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... operation when the external power supply is connected to the main electricity supply and the output is (or... external power supply is connected to the main electricity supply and the output is (or “all outputs are... switches, in which the external power supply is (1) connected to the main electricity supply; (2) the...

  19. STS-47 Japanese Payload Specialist Mohri and backups during Homestead training

    NASA Technical Reports Server (NTRS)

    1990-01-01

    STS-47 Endeavour, Orbiter Vehicle (OV) 105, Japanese Payload Specialist Mamoru Mohri (far left), backup Payload Specialist Takao Doi (center), and backup Payload Specialist Chiaki Mukai (right) participate in water survival training at Homestead Air Force Base, Florida. Dockside, Mohri and Mukai wash the salt water from their personalized helmets after a water exercise. The three-day course was attended by the STS-47 prime and alternate payload specialists shortly after they were announced for the scheduled summer of 1992 Spacelab Japan (SLJ) mission. Mohri, Doi, and Mukai all represent the National Space Development Agency of Japan (NASDA).

  20. Analyzing Power Supply and Demand on the ISS

    NASA Technical Reports Server (NTRS)

    Thomas, Justin; Pham, Tho; Halyard, Raymond; Conwell, Steve

    2006-01-01

    Station Power and Energy Evaluation Determiner (SPEED) is a Java application program for analyzing the supply and demand aspects of the electrical power system of the International Space Station (ISS). SPEED can be executed on any computer that supports version 1.4 or a subsequent version of the Java Runtime Environment. SPEED includes an analysis module, denoted the Simplified Battery Solar Array Model, which is a simplified engineering model of the ISS primary power system. This simplified model makes it possible to perform analyses quickly. SPEED also includes a user-friendly graphical-interface module, an input file system, a parameter-configuration module, an analysis-configuration-management subsystem, and an output subsystem. SPEED responds to input information on trajectory, shadowing, attitude, and pointing in either a state-of-charge mode or a power-availability mode. In the state-of-charge mode, SPEED calculates battery state-of-charge profiles, given a time-varying power-load profile. In the power-availability mode, SPEED determines the time-varying total available solar array and/or battery power output, given a minimum allowable battery state of charge.

  1. Supply Chain Viability for the North American Microwave Power Tube Industry

    DTIC Science & Technology

    2002-09-30

    Industry iii Supply Chain Viability for the North American Microwave Power Tube Industry September 2002 Therese M. Philippi Federico M. Sciammarella ...U.S. Microwave Power Tube Industry 5. FUNDING NUMBERS SPO700-97-D-4005 6. AUTHOR(S) Therese M. Philippi and Federico M. Sciammarella 7

  2. 10 CFR 503.8 - No alternate power supply-general requirement for certain exemptions for new powerplants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false No alternate power supply-general requirement for certain... NEW FACILITIES General Requirements for Exemptions § 503.8 No alternate power supply—general... demonstration that, despite reasonable good faith efforts, there is no alternative supply of electric power...

  3. 10 CFR 503.8 - No alternate power supply-general requirement for certain exemptions for new powerplants.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false No alternate power supply-general requirement for certain... NEW FACILITIES General Requirements for Exemptions § 503.8 No alternate power supply—general... demonstration that, despite reasonable good faith efforts, there is no alternative supply of electric power...

  4. Chip-to-Chip Half Duplex Spiking Data Communication over Power Supply Rails

    NASA Astrophysics Data System (ADS)

    Hashida, Takushi; Nagata, Makoto

    Chip-to-chip serial data communication is superposed on power supply over common Vdd/Vss connections through chip, package, and board traces. A power line transceiver demonstrates half duplex spiking communication at more than 100Mbps. A pair of transceivers consumes 1.35mA from 3.3V, at 130Mbps. On-chip power line LC low pass filter attenuates pseudo-differential communication spikes by 30dB, purifying power supply current for internal circuits. Bi-directional spiking communication was successfully examined in a 90-nm CMOS prototype setup of on-chip waveform capturing. A micro controller forwards clock pulses to and receives data streams from a comparator based waveform capturer formed on a different chip, through a single pair of power and ground traces. The bit error rate is small enough not to degrade waveform acquisition capability, maintaining the spurious free dynamic range of higher than 50dB.

  5. A Power-Efficient Wireless System With Adaptive Supply Control for Deep Brain Stimulation.

    PubMed

    Lee, Hyung-Min; Park, Hangue; Ghovanloo, Maysam

    2013-09-01

    A power-efficient wireless stimulating system for a head-mounted deep brain stimulator (DBS) is presented. A new adaptive rectifier generates a variable DC supply voltage from a constant AC power carrier utilizing phase control feedback, while achieving high AC-DC power conversion efficiency (PCE) through active synchronous switching. A current-controlled stimulator adopts closed-loop supply control to automatically adjust the stimulation compliance voltage by detecting stimulation site potentials through a voltage readout channel, and improve the stimulation efficiency. The stimulator also utilizes closed-loop active charge balancing to maintain the residual charge at each site within a safe limit, while receiving the stimulation parameters wirelessly from the amplitude-shift-keyed power carrier. A 4-ch wireless stimulating system prototype was fabricated in a 0.5-μm 3M2P standard CMOS process, occupying 2.25 mm². With 5 V peak AC input at 2 MHz, the adaptive rectifier provides an adjustable DC output between 2.5 V and 4.6 V at 2.8 mA loading, resulting in measured PCE of 72 ~ 87%. The adaptive supply control increases the stimulation efficiency up to 30% higher than a fixed supply voltage to 58 ~ 68%. The prototype wireless stimulating system was verified in vitro .

  6. A Power-Efficient Wireless System With Adaptive Supply Control for Deep Brain Stimulation

    PubMed Central

    Lee, Hyung-Min; Park, Hangue; Ghovanloo, Maysam

    2014-01-01

    A power-efficient wireless stimulating system for a head-mounted deep brain stimulator (DBS) is presented. A new adaptive rectifier generates a variable DC supply voltage from a constant AC power carrier utilizing phase control feedback, while achieving high AC-DC power conversion efficiency (PCE) through active synchronous switching. A current-controlled stimulator adopts closed-loop supply control to automatically adjust the stimulation compliance voltage by detecting stimulation site potentials through a voltage readout channel, and improve the stimulation efficiency. The stimulator also utilizes closed-loop active charge balancing to maintain the residual charge at each site within a safe limit, while receiving the stimulation parameters wirelessly from the amplitude-shift-keyed power carrier. A 4-ch wireless stimulating system prototype was fabricated in a 0.5-μm 3M2P standard CMOS process, occupying 2.25 mm². With 5 V peak AC input at 2 MHz, the adaptive rectifier provides an adjustable DC output between 2.5 V and 4.6 V at 2.8 mA loading, resulting in measured PCE of 72 ~ 87%. The adaptive supply control increases the stimulation efficiency up to 30% higher than a fixed supply voltage to 58 ~ 68%. The prototype wireless stimulating system was verified in vitro. PMID:24678126

  7. Power supplies for long duration balloon flights

    NASA Astrophysics Data System (ADS)

    Lichfield, Ernest W.

    Long duration balloon flights require more electrical power than can be carried in primary batteries. This paper provides design information for selecting rechargeable batteries and charging systems. Solar panels for recharging batteries are discussed, with particular emphasis on cells mounting suitable for balloon flights and panel orientation for maximum power collection. Since efficient utilization of power is so important, modern DC to DC power conversion techniques are presented. On short flights of 1 day or less, system designers have not been greatly concerned with battery weight. But, with the advent of long duration balloon flights using superpressure balloons, anchor balloon systems, and RACOON balloon techniques, power supplies and their weight become of prime importance. The criteria for evaluating power systems for long duration balloon flights is performance per unit weight. Instrumented balloon systems have flown 44 days. For these very long duration flights, batteries recharged from solar cells are the only solution. For intermediate flight duration, say less than 10 days, the system designer should seriously consider using primary cells. The National Center for Atmospheric Research is sponsored by the National Science Foundation. Any opinions, findings and conclusions or recommendations expressed in this publication are those of the authors and do not necessarily reflect the views of the National Science Foundation.

  8. Forest biomass supply logistics for a power plant using the discrete-event simulation approach

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mobini, Mahdi; Sowlati, T.; Sokhansanj, Shahabaddine

    This study investigates the logistics of supplying forest biomass to a potential power plant. Due to the complexities in such a supply logistics system, a simulation model based on the framework of Integrated Biomass Supply Analysis and Logistics (IBSAL) is developed in this study to evaluate the cost of delivered forest biomass, the equilibrium moisture content, and carbon emissions from the logistics operations. The model is applied to a proposed case of 300 MW power plant in Quesnel, BC, Canada. The results show that the biomass demand of the power plant would not be met every year. The weighted averagemore » cost of delivered biomass to the gate of the power plant is about C$ 90 per dry tonne. Estimates of equilibrium moisture content of delivered biomass and CO2 emissions resulted from the processes are also provided.« less

  9. A HIGH BANDWIDTH BIPOLAR POWER SUPPLY FOR THE FAST CORRECTORS IN THE APS UPGRADE*

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Ju; Sprau, Gary

    The APS Upgrade of a multi-bend achromat (MBA) storage ring requires a fast bipolar power supply for the fast correction magnets. The key performance requirement of the power supply includes a small-signal bandwidth of 10 kHz for the output current. This requirement presents a challenge to the design because of the high inductance of the magnet load and a limited input DC voltage. A prototype DC/DC power supply utilizing a MOSFET H-bridge circuit with a 500 kHz PWM has been developed and tested successfully. The prototype achieved a 10-kHz bandwidth with less than 3-dB attenuation for a signal 0.5% ofmore » the maximum operating current of 15 amperes. This paper presents the design of the power circuit, the PWM method, the control loop, and the test results.« less

  10. A programmable, multichannel power supply for SIPMs with temperature compensation loop and Ethernet interface

    NASA Astrophysics Data System (ADS)

    Querol, M.; Rodríguez, J.; Toledo, J.; Esteve, R.; Álvarez, V.; Herrero, V.

    2016-12-01

    Among the different techniques available, the SiPM power supply described in this paper uses output voltage and sensor temperature feedback. A high-resolution ADC digitizes both the output voltage and an analog signal proportional to the SiPM temperature for each of its 16 independent outputs. The appropriate change in the bias voltage is computed in a micro-controller and this correction is applied via a high resolution DAC to the control input of a DC/DC module that produces the output voltage. This method allows a reduction in gain variations from typically 30% to only 0.5% in a 10 °C range. The power supply is housed in a 3U-height aluminum box. A 2.8'' touch screen on the front panel provides local access to the configuration and monitoring functions using a graphical interface. The unit has an Ethernet interface on its rear side to provide remote operation and integration in slow control systems using the encrypted and secure SSH protocol. A LabVIEW application with SSH interface has been designed to operate the power supply from a remote computer. The power supply has good characteristics, such as 85 V output range with 1 mV resolution and stability better than 2 mVP, excellent output load regulation and programmable rise and fall voltage ramps. Commercial power supplies from well-known manufacturers can show far better specifications though can also result in an over featured and over costly solution for typical applications.

  11. Power converters for the 120 V bus supply control

    NASA Astrophysics Data System (ADS)

    Elisabelar, Christian

    1993-03-01

    Power converters for the 120 V bus supply control in such projects as Columbus and Hermes are addressed. Because of the power levels involved and the existing state of the art, several converter modules need to be connected in parallel to supply a single bus. To simplify the study, the power of each converter is set at around 1 kW. Many converter structures which satisfy requirement specifications and several solutions, with or without galvanic insulation, are proposed. The choice and sizing of the converter structure are considered. Stress factors and available technology are selection criteria in determining the most suitable structures. The dimensions of each structure, taking into account the rules of space design enable efficiency to be analytically estimated and it is subsequently verified experimentally. The converter command and its functional performance are then addressed. Numerical simulations with SUCCESS software are run to observe the actual operation of the power part of the converter and to develop the command law with its regulation parameters. The converter is simulated in its entirety and different transients are studied like load variation, no load operating point, short circuit. The response time, stability and behavior under disturbed conditions are thus known. A comparison of the various structures studied enabled the optimal converter to be chosen for some 120 V regulated bus applications.

  12. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Trailing cables supplying power to low-voltage... Alternating Current Circuits § 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...

  13. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Trailing cables supplying power to low-voltage... Alternating Current Circuits § 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...

  14. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Trailing cables supplying power to low-voltage... Alternating Current Circuits § 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...

  15. Transistor-based filter for inhibiting load noise from entering a power supply

    DOEpatents

    Taubman, Matthew S

    2013-07-02

    A transistor-based filter for inhibiting load noise from entering a power supply is disclosed. The filter includes a first transistor having an emitter coupled to a power supply, a collector coupled to a load, and a base. The filter also includes a first capacitor coupled between the base of the first transistor and a ground terminal. The filter further includes an impedance coupled between the base and a node between the collector and the load, or a second transistor and second capacitor. The impedance can be a resistor or an inductor.

  16. Transistor-based filter for inhibiting load noise from entering a power supply

    DOEpatents

    Taubman, Matthew S

    2015-02-24

    A transistor-based filter for inhibiting load noise from entering a power supply is disclosed. The filter includes a first transistor having an emitter coupled to a power supply, a collector coupled to a load, and a base. The filter also includes a first capacitor coupled between the base of the first transistor and a ground terminal The filter further includes an impedance coupled between the base and a node between the collector and the load, or a second transistor and second capacitor. The impedance can be a resistor or an inductor.

  17. Programmable Multiple-Ramped-Voltage Power Supply

    NASA Technical Reports Server (NTRS)

    Ajello, Joseph M.; Howell, S. K.

    1993-01-01

    Ramp waveforms range up to 2,000 V. Laboratory high-voltage power-supply system puts out variety of stable voltages programmed to remain fixed with respect to ground or float with respect to ramp waveform. Measures voltages it produces with high resolution; automatically calibrates, zeroes, and configures itself; and produces variety of input/output signals for use with other instruments. Developed for use with ultraviolet spectrometer. Also applicable to control of electron guns in general and to operation of such diverse equipment used in measuring scattering cross sections of subatomic particles and in industrial electron-beam welders.

  18. Thermal control of power supplies with electronic packaging techniques. [using low cost heat pipes

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The integration of low-cost commercial heat pipes in the design of a NASA candidate standard modular power supply with a 350 watt output resulted in a 44% weight reduction. Part temperatures were also appreciably reduced, increasing the environmental capability of the unit. A complete 350- watt modular power converter was built and tested to evaluate thermal performance of the redesigned supply.

  19. Digital combined instrument transformer for automated electric power supply control systems of mining companies

    NASA Astrophysics Data System (ADS)

    Topolsky, D. V.; Gonenko, T. V.; Khatsevskiy, V. F.

    2017-10-01

    The present paper discusses ways to solve the problem of enhancing operating efficiency of automated electric power supply control systems of mining companies. According to the authors, one of the ways to solve this problem is intellectualization of the electric power supply control system equipment. To enhance efficiency of electric power supply control and electricity metering, it is proposed to use specially designed digital combined instrument current and voltage transformers. This equipment conforms to IEC 61850 international standard and is adapted for integration into the digital substation structure. Tests were performed to check conformity of an experimental prototype of the digital combined instrument current and voltage transformer with IEC 61850 standard. The test results have shown that the considered equipment meets the requirements of the standard.

  20. STS-55 German payload specialists (and backups) in LESs during JSC training

    NASA Technical Reports Server (NTRS)

    1992-01-01

    STS-55 Columbia, Orbiter Vehicle (OV) 102, German payload specialists and backup (alternate) payload specialists, wearing launch and entry suits (LESs), pose for group portrait outside mockup side hatch in JSC's Mockup and Integration Laboratory (MAIL) Bldg 9NE. These payload specialists will support the STS-55 Spacelab Deutsche 2 (SL-D2) mission. It is the second dedicated German (Deutsche) Spacelab flight. Left to right are backup Payload Specialists Renate Brummer and Dr. P. Gerhard Thiele, Payload Specialist 1 Ulrich Walter, and Payload Specialist 2 Hans Schlegel.

  1. Design development and testing of high voltage power supply with crowbar protection for IOT based RF amplifier system in VECC

    NASA Astrophysics Data System (ADS)

    Thakur, S. K.; Kumar, Y.

    2018-05-01

    This paper described the detailed design, development and testing of high voltage power supply (‑30 kV, 3.2 A) and different power supplies for biasing electrodes of Inductive Output Tube (IOT) based high power Radio Frequency (RF) amplifier. This IOT based RF amplifier is further used for pursuing research and development activity in superconducting RF cavity project at Variable Energy Cyclotron Centre (VECC) Kolkata. The state-of-the-art technology of IOT-based high power RF amplifier is designed, developed, and tested at VECC which is the first of its kind in India. A high voltage power supply rated at negative polarity of 30 kV dc/3.2 A is required for biasing cathode of IOT with crowbar protection circuit. This power supply along with crowbar protection system is designed, developed and tested at VECC for testing the complete setup. The technical difficulties and challenges occured during the design of cathode power supply, its crowbar protection techniques along with other supported power supplies i.e. grid and ion pump power supplies are discussed in this paper.

  2. 7 CFR 1710.302 - Financial forecasts-power supply borrowers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Financial forecasts-power supply borrowers. 1710.302 Section 1710.302 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GENERAL AND PRE-LOAN POLICIES AND PROCEDURES COMMON TO ELECTRIC LOANS AND GUARANTEES Long-Range Financial...

  3. A combined compensation method for the output voltage of an insulated core transformer power supply

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yang, L.; Yang, J., E-mail: jyang@mail.hust.edu.cn; Liu, K. F.

    2014-06-15

    An insulated core transformer (ICT) power supply is an ideal high-voltage generator for irradiation accelerators with energy lower than 3 MeV. However, there is a significant problem that the structure of the segmented cores leads to an increase in the leakage flux and voltage differences between rectifier disks. A high level of consistency in the output of the disks helps to achieve a compact structure by improving the utilization of both the rectifier components and the insulation distances, and consequently increase the output voltage of the power supply. The output voltages of the disks which are far away from themore » primary coils need to be improved to reduce their inhomogeneity. In this study, by investigating and comparing the existing compensation methods, a new combined compensation method is proposed, which increases the turns on the secondary coils and employs parallel capacitors to improve the consistency of the disks, while covering the entire operating range of the power supply. This method turns out to be both feasible and effective during the development of an ICT power supply. The non-uniformity of the output voltages of the disks is less than 3.5% from no-load to full-load, and the power supply reaches an output specification of 350 kV/60 mA.« less

  4. RELAP5-3D Resolution of Known Restart/Backup Issues

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mesina, George L.; Anderson, Nolan A.

    2014-12-01

    The state-of-the-art nuclear reactor system safety analysis computer program developed at the Idaho National Laboratory (INL), RELAP5-3D, continues to adapt to changes in computer hardware and software and to develop to meet the ever-expanding needs of the nuclear industry. To continue at the forefront, code testing must evolve with both code and industry developments, and it must work correctly. To best ensure this, the processes of Software Verification and Validation (V&V) are applied. Verification compares coding against its documented algorithms and equations and compares its calculations against analytical solutions and the method of manufactured solutions. A form of this, sequentialmore » verification, checks code specifications against coding only when originally written then applies regression testing which compares code calculations between consecutive updates or versions on a set of test cases to check that the performance does not change. A sequential verification testing system was specially constructed for RELAP5-3D to both detect errors with extreme accuracy and cover all nuclear-plant-relevant code features. Detection is provided through a “verification file” that records double precision sums of key variables. Coverage is provided by a test suite of input decks that exercise code features and capabilities necessary to model a nuclear power plant. A matrix of test features and short-running cases that exercise them is presented. This testing system is used to test base cases (called null testing) as well as restart and backup cases. It can test RELAP5-3D performance in both standalone and coupled (through PVM to other codes) runs. Application of verification testing revealed numerous restart and backup issues in both standalone and couple modes. This document reports the resolution of these issues.« less

  5. Rodney Hunt supplies gates to Idaho Power's Swan Falls

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-02-01

    Rodney Hunt Co. shipped two 30-foot by 28-foot fabricated steel roller gates to Idaho Power Co.'s Swan Falls Dam Project, where they will be installed as draft tube gates. Rodney Hunt said the gates, each weighing approximately 55 tons, are the largest roller gates the company has manufactured. The company supplied the gates under the terms of a contract worth more than $500,000. The gates were ordered as part of Idaho Power's rehabilitation of Swan Falls Dam, which will double the power plant's capacity to 25 MW. New units will begin producing power in 1993, and the project will bemore » completed in 1994. Elsewhere on the Snake River, Idaho Power intends to increase the capacity of its Twin Falls project to 52 MW from 10 MW. Construction is scheduled to start in June 1993.« less

  6. 7 CFR 1710.208 - RUS criteria for approval of all load forecasts by power supply borrowers and by distribution...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... power supply borrowers and by distribution borrowers required to maintain an approved load forecast on... forecasts by power supply borrowers and by distribution borrowers required to maintain an approved load forecast on an ongoing basis. All load forecasts submitted by power supply borrowers and by distribution...

  7. 7 CFR 1710.208 - RUS criteria for approval of all load forecasts by power supply borrowers and by distribution...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... power supply borrowers and by distribution borrowers required to maintain an approved load forecast on... forecasts by power supply borrowers and by distribution borrowers required to maintain an approved load forecast on an ongoing basis. All load forecasts submitted by power supply borrowers and by distribution...

  8. 7 CFR 1710.208 - RUS criteria for approval of all load forecasts by power supply borrowers and by distribution...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... power supply borrowers and by distribution borrowers required to maintain an approved load forecast on... forecasts by power supply borrowers and by distribution borrowers required to maintain an approved load forecast on an ongoing basis. All load forecasts submitted by power supply borrowers and by distribution...

  9. 7 CFR 1710.208 - RUS criteria for approval of all load forecasts by power supply borrowers and by distribution...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... power supply borrowers and by distribution borrowers required to maintain an approved load forecast on... forecasts by power supply borrowers and by distribution borrowers required to maintain an approved load forecast on an ongoing basis. All load forecasts submitted by power supply borrowers and by distribution...

  10. Design and preliminary test results of the 40 MW power supply at the national high magnetic field laboratory

    NASA Astrophysics Data System (ADS)

    Boenig, Heinrich J.; Bogdan, Ferenc; Morris, Gary C.; Ferner, James A.; Schneider-Muntau, Hans J.; Rumrill, Ronald H.; Rumrill, Ronald S.

    1994-07-01

    Four highly stabilized, steady-state, 10 MW power supplies have been installed at the National High Magnetic Field Laboratory in Tallahassee, FL. Each supply consists of a 12.5 kV vacuum circuit breaker, two three-winding, step-down transformers, a 24-pulse rectifier with interphase reactors and freewheeling diodes, and a passive and an active filter. Two different transformer tap settings allow dc supply output voltages of 400 and 500 V. The rated current of a supply is 17 kA and each supply has a one hour overload capability of 20 kA. The power supply output bus system, including a reversing switch at the input and 2 x 16 disconnect switches at the output, connects each supply to 16 different magnet cells. The design of the power supply is described and preliminary test results with a supply feeding a 10 MW resistive load are presented.

  11. Electric power supply and demand for the contiguous United States, 1981 - 1990

    NASA Astrophysics Data System (ADS)

    1981-07-01

    The outlook for electric power supply and demand in the United States decade 1981 to 1990 is reviewed from the perspective of reliability and adequacy of service. Electric power supply adequacy as projected for the nine Regional Reliability Council areas of the contiguous United States is reported as well as interruptible load data reported by the Councils. cogeneration is discussed. Each of the 27 electric regions (sub-areas of the nine Council areas) in the contiguous US are studied. A glossary of terms is given. Appendices describe the Council structure, and include a copy of the ERA-411 Manual, which contains all the items to which the Councils were asked to respond. The utilities with included data, the Staff Report, Estimated Electric Demand and Supply for Summer 1981, Contiguous United States dated May 1981 are included.

  12. Sunlight Helps Laboratory Get Ready for Y2K

    Science.gov Websites

    by the end of December to provide emergency electricity to the Site Entrance Building (SEB), which solar power if the supply of electricity from the local utility grid is interrupted. The solar generator failure disrupts electricity supplies. If a power failure should be protracted, a secondary propane backup

  13. Techno-economic analysis of using corn stover to supply heat and power to a corn ethanol plant - Part 1: Cost of feedstock supply logistics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sokhansanj, Shahabaddine; Mani, Sudhagar; Togore, Sam

    2010-01-01

    Supply of corn stover to produce heat and power for a typical 170 dam3 dry mill ethanol plant is proposed. The corn ethanol plant requires 5.6 MW of electricity and 52.3 MW of process heat, which creates the annual stover demand of as much as 140 Gg. The corn stover supply system consists of collection, preprocessing, transportation and on-site fuel storage and preparation to produce heat and power for the ethanol plant. Economics of the entire supply system was conducted using the Integrated Biomass Supply Analysis and Logistics (IBSAL) simulation model. Corn stover was delivered in three formats (square bales,more » dry chops and pellets) to the combined heat and power plant. Delivered cost of biomass ready to be burned was calculated at 73 $ Mg-1 for bales, 86 $ Mg-1 for pellets and 84 $ Mg-1 for field chopped biomass. Among the three formats of stover supply systems, delivered cost of pelleted biomass was the highest due to high pelleting cost. Bulk transport of biomass in the form of chops and pellets can provide a promising future biomass supply logistic system in the US, if the costs of pelleting and transport are minimized.« less

  14. DOMe: A deduplication optimization method for the NewSQL database backups

    PubMed Central

    Wang, Longxiang; Zhu, Zhengdong; Zhang, Xingjun; Wang, Yinfeng

    2017-01-01

    Reducing duplicated data of database backups is an important application scenario for data deduplication technology. NewSQL is an emerging database system and is now being used more and more widely. NewSQL systems need to improve data reliability by periodically backing up in-memory data, resulting in a lot of duplicated data. The traditional deduplication method is not optimized for the NewSQL server system and cannot take full advantage of hardware resources to optimize deduplication performance. A recent research pointed out that the future NewSQL server will have thousands of CPU cores, large DRAM and huge NVRAM. Therefore, how to utilize these hardware resources to optimize the performance of data deduplication is an important issue. To solve this problem, we propose a deduplication optimization method (DOMe) for NewSQL system backup. To take advantage of the large number of CPU cores in the NewSQL server to optimize deduplication performance, DOMe parallelizes the deduplication method based on the fork-join framework. The fingerprint index, which is the key data structure in the deduplication process, is implemented as pure in-memory hash table, which makes full use of the large DRAM in NewSQL system, eliminating the performance bottleneck problem of fingerprint index existing in traditional deduplication method. The H-store is used as a typical NewSQL database system to implement DOMe method. DOMe is experimentally analyzed by two representative backup data. The experimental results show that: 1) DOMe can reduce the duplicated NewSQL backup data. 2) DOMe significantly improves deduplication performance by parallelizing CDC algorithms. In the case of the theoretical speedup ratio of the server is 20.8, the speedup ratio of DOMe can achieve up to 18; 3) DOMe improved the deduplication throughput by 1.5 times through the pure in-memory index optimization method. PMID:29049307

  15. 78 FR 77171 - Proposed Disposal of George H.W. Bush and Clinton Administration Electronic Backup Tapes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-20

    ... NATIONAL ARCHIVES AND RECORDS ADMINISTRATION [NARA-2014-011] Proposed Disposal of George H.W. Bush... George H.W. Bush and Clinton Administration Disaster Recovery Backup Tapes; final agency action. SUMMARY... collection of disaster recovery backup tapes from the George H.W. Bush and Clinton administrations under the...

  16. 77 FR 27225 - Liberty Power Wholesale Supply, LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-09

    ... Liberty Power Wholesale Supply, LLC's application for market-based rate authority, with an accompanying... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12-1707-000] Liberty Power Wholesale Supply, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for...

  17. [Russian treadmill BD-1 as a backup of the NASA TVIS].

    PubMed

    Iarmanova, E N; Kozlovskaia, I B; Bogomolov, V V; Rumiantseva, O N; Sukhachev, V I; Mel'nik, K A

    2006-01-01

    Already during the early ISS increments malfunctioning of NASA TVIS (treadmill with vibration isolation system) posed major problems for regular crew training and particularly scamper, one of the key exercises on the Russian physical training program. During ISS increment-3, TVIS unscheduled repairs took virtually all the training time. In search for TVIS backup, Russian and NASA engineers considered jointly Russian treadmill BD-1, originally designed for Russian "shuttle" Buran and accepted it as a suitable backup in case of complete TVIS failure. To enter into the "dialogue" with BD-1, i.e., to record and downlink training data, the treadmill speed indicator, a part of the treadmill stand, was replaced by PC.

  18. External CO2 and water supplies for enhancing electrical power generation of air-cathode microbial fuel cells.

    PubMed

    Ishizaki, So; Fujiki, Itto; Sano, Daisuke; Okabe, Satoshi

    2014-10-07

    Alkalization on the cathode electrode limits the electrical power generation of air-cathode microbial fuel cells (MFCs), and thus external proton supply to the cathode electrode is essential to enhance the electrical power generation. In this study, the effects of external CO2 and water supplies to the cathode electrode on the electrical power generation were investigated, and then the relative contributions of CO2 and water supplies to the total proton consumption were experimentally evaluated. The CO2 supply decreased the cathode pH and consequently increased the power generation. Carbonate dissolution was the main proton source under ambient air conditions, which provides about 67% of total protons consumed for the cathode reaction. It is also critical to adequately control the water content on the cathode electrode of air-cathode MFCs because the carbonate dissolution was highly dependent on water content. On the basis of these experimental results, the power density was increased by 400% (143.0 ± 3.5 mW/m(2) to 575.0 ± 36.0 mW/m(2)) by supplying a humid gas containing 50% CO2 to the cathode chamber. This study demonstrates that the simultaneous CO2 and water supplies to the cathode electrode were effective to increase the electrical power generation of air-cathode MFCs for the first time.

  19. 77 FR 5009 - Power Supply Services LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12-862-000] Power Supply Services LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Power Supply...

  20. Do familiar teammates request and accept more backup? Transactive memory in air traffic control.

    PubMed

    Smith-Jentsch, Kimberly A; Kraiger, Kurt; Cannon-Bowers, Janis A; Salas, Eduardo

    2009-04-01

    The present study investigated factors that explain when and why different groups of teammates are more likely to request and accept backup from one another when needed in an environment characterized by extreme time pressure and severe consequences of error: commercial air traffic control (ATC). Transactive memory theory states that teammates develop consensus regarding the distribution of their relative expertise as well as confidence in that expertise over time and that this facilitates coordination processes. The present study investigated whether this theory could help to explain between-team differences in requesting and accepting backup when needed. The present study used cross-sectional data collected from 51 commercial ATC teams. Hypotheses were tested using multiple regression analysis. Teammates with greater experience working together requested and accepted backup from one another more than those with lesser experience working together. Teammate knowledge consensus and perceived team efficacy appear to have mediated this relationship. Transactive memory theory extends to high-stress environments in which members' expertise is highly overlapping. Teammates' shared mental models about one another increase the likelihood that they will request and accept backup. Teammate familiarity should be considered when choosing among potential replacement team members. Training strategies that accelerate the development of teammate knowledge consensus and team efficacy are warranted.

  1. Alkali Metal Backup Cooling for Stirling Systems - Experimental Results

    NASA Technical Reports Server (NTRS)

    Schwendeman, Carl; Tarau, Calin; Anderson, William G.; Cornell, Peggy A.

    2013-01-01

    In a Stirling Radioisotope Power System (RPS), heat must be continuously removed from the General Purpose Heat Source (GPHS) modules to maintain the modules and surrounding insulation at acceptable temperatures. The Stirling convertor normally provides this cooling. If the Stirling convertor stops in the current system, the insulation is designed to spoil, preventing damage to the GPHS at the cost of an early termination of the mission. An alkali-metal Variable Conductance Heat Pipe (VCHP) can be used to passively allow multiple stops and restarts of the Stirling convertor. In a previous NASA SBIR Program, Advanced Cooling Technologies, Inc. (ACT) developed a series of sodium VCHPs as backup cooling systems for Stirling RPS. The operation of these VCHPs was demonstrated using Stirling heater head simulators and GPHS simulators. In the most recent effort, a sodium VCHP with a stainless steel envelope was designed, fabricated and tested at NASA Glenn Research Center (GRC) with a Stirling convertor for two concepts; one for the Advanced Stirling Radioisotope Generator (ASRG) back up cooling system and one for the Long-lived Venus Lander thermal management system. The VCHP is designed to activate and remove heat from the stopped convertor at a 19 C temperature increase from the nominal vapor temperature. The 19 C temperature increase from nominal is low enough to avoid risking standard ASRG operation and spoiling of the Multi-Layer Insulation (MLI). In addition, the same backup cooling system can be applied to the Stirling convertor used for the refrigeration system of the Long-lived Venus Lander. The VCHP will allow the refrigeration system to: 1) rest during transit at a lower temperature than nominal; 2) pre-cool the modules to an even lower temperature before the entry in Venus atmosphere; 3) work at nominal temperature on Venus surface; 4) briefly stop multiple times on the Venus surface to allow scientific measurements. This paper presents the experimental

  2. Alkali Metal Backup Cooling for Stirling Systems - Experimental Results

    NASA Technical Reports Server (NTRS)

    Schwendeman, Carl; Tarau, Calin; Anderson, William G.; Cornell, Peggy A.

    2013-01-01

    In a Stirling Radioisotope Power System (RPS), heat must be continuously removed from the General Purpose Heat Source (GPHS) modules to maintain the modules and surrounding insulation at acceptable temperatures. The Stirling convertor normally provides this cooling. If the Stirling convertor stops in the current system, the insulation is designed to spoil, preventing damage to the GPHS at the cost of an early termination of the mission. An alkali-metal Variable Conductance Heat Pipe (VCHP) can be used to passively allow multiple stops and restarts of the Stirling convertor. In a previous NASA SBIR Program, Advanced Cooling Technologies, Inc. (ACT) developed a series of sodium VCHPs as backup cooling systems for Stirling RPS. The operation of these VCHPs was demonstrated using Stirling heater head simulators and GPHS simulators. In the most recent effort, a sodium VCHP with a stainless steel envelope was designed, fabricated and tested at NASA Glenn Research Center (GRC) with a Stirling convertor for two concepts; one for the Advanced Stirling Radioisotope Generator (ASRG) back up cooling system and one for the Long-lived Venus Lander thermal management system. The VCHP is designed to activate and remove heat from the stopped convertor at a 19 degC temperature increase from the nominal vapor temperature. The 19 degC temperature increase from nominal is low enough to avoid risking standard ASRG operation and spoiling of the Multi-Layer Insulation (MLI). In addition, the same backup cooling system can be applied to the Stirling convertor used for the refrigeration system of the Long-lived Venus Lander. The VCHP will allow the refrigeration system to: 1) rest during transit at a lower temperature than nominal; 2) pre-cool the modules to an even lower temperature before the entry in Venus atmosphere; 3) work at nominal temperature on Venus surface; 4) briefly stop multiple times on the Venus surface to allow scientific measurements. This paper presents the experimental

  3. High voltage power supply with modular series resonant inverters

    DOEpatents

    Dreifuerst, Gary R.; Merritt, Bernard T.

    1995-01-01

    A relatively small and compact high voltage, high current power supply for a laser utilizes a plurality of modules containing series resonant half bridge inverters. A pair of reverse conducting thyristors are incorporated in each series resonant inverter module such that the series resonant inverter modules are sequentially activated in phases 360.degree./n apart, where n=number of modules for n>2. Selective activation of the modules allows precise output control reducing ripple and improving efficiency. Each series resonant half bridge inverter module includes a transformer which has a cooling manifold for actively circulating a coolant such as water, to cool the transformer core as well as selected circuit elements. Conductors connecting and forming various circuit components comprise hollow, electrically conductive tubes such as copper. Coolant circulates through the tubes to remove heat. The conductive tubes act as electrically conductive lines for connecting various components of the power supply. Where it is desired to make electrical isolation breaks, tubes comprised of insulating material such as nylon are used to provide insulation and continue the fluid circuit.

  4. High voltage power supply with modular series resonant inverters

    DOEpatents

    Dreifuerst, G.R.; Merritt, B.T.

    1995-07-18

    A relatively small and compact high voltage, high current power supply for a laser utilizes a plurality of modules containing series resonant half bridge inverters. A pair of reverse conducting thyristors are incorporated in each series resonant inverter module such that the series resonant inverter modules are sequentially activated in phases 360{degree}/n apart, where n=number of modules for n>2. Selective activation of the modules allows precise output control reducing ripple and improving efficiency. Each series resonant half bridge inverter module includes a transformer which has a cooling manifold for actively circulating a coolant such as water, to cool the transformer core as well as selected circuit elements. Conductors connecting and forming various circuit components comprise hollow, electrically conductive tubes such as copper. Coolant circulates through the tubes to remove heat. The conductive tubes act as electrically conductive lines for connecting various components of the power supply. Where it is desired to make electrical isolation breaks, tubes comprised of insulating material such as nylon are used to provide insulation and continue the fluid circuit. 11 figs.

  5. 14 CFR 121.645 - Fuel supply: Turbine-engine powered airplanes, other than turbo propeller: Flag and supplemental...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... specifications, no person may release for flight or takeoff a turbine-engine powered airplane (other than a turbo... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Fuel supply: Turbine-engine powered... SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.645 Fuel supply: Turbine-engine powered...

  6. 14 CFR 121.645 - Fuel supply: Turbine-engine powered airplanes, other than turbo propeller: Flag and supplemental...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... specifications, no person may release for flight or takeoff a turbine-engine powered airplane (other than a turbo... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Fuel supply: Turbine-engine powered... SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.645 Fuel supply: Turbine-engine powered...

  7. Transportation and dynamic networks: Models, theory, and applications to supply chains, electric power, and financial networks

    NASA Astrophysics Data System (ADS)

    Liu, Zugang

    Network systems, including transportation and logistic systems, electric power generation and distribution networks as well as financial networks, provide the critical infrastructure for the functioning of our societies and economies. The understanding of the dynamic behavior of such systems is also crucial to national security and prosperity. The identification of new connections between distinct network systems is the inspiration for the research in this dissertation. In particular, I answer two questions raised by Beckmann, McGuire, and Winsten (1956) and Copeland (1952) over half a century ago, which are, respectively, how are electric power flows related to transportation flows and does money flow like water or electricity? In addition, in this dissertation, I achieve the following: (1) I establish the relationships between transportation networks and three other classes of complex network systems: supply chain networks, electric power generation and transmission networks, and financial networks with intermediation. The establishment of such connections provides novel theoretical insights as well as new pricing mechanisms, and efficient computational methods. (2) I develop new modeling frameworks based on evolutionary variational inequality theory that capture the dynamics of such network systems in terms of the time-varying flows and incurred costs, prices, and, where applicable, profits. This dissertation studies the dynamics of such network systems by addressing both internal competition and/or cooperation, and external changes, such as varying costs and demands. (3) I focus, in depth, on electric power supply chains. By exploiting the relationships between transportation networks and electric power supply chains, I develop a large-scale network model that integrates electric power supply chains and fuel supply markets. The model captures both the economic transactions as well as the physical transmission constraints. The model is then applied to the New

  8. Evolution of systems concepts for a 100 kWe class Space Nuclear Power System

    NASA Technical Reports Server (NTRS)

    Katucki, R.; Josloff, A.; Kirpich, A.; Florio, F.

    1985-01-01

    Conceptual designs for the SP-100 Space Nuclear Power System have been prepared that meet baseline, backup and growth program scenarios. Near-term advancement in technology was considered in the design of the Baseline Concept. An improved silicon-germanium thermoelectric technique is used to convert the heat from a fast-spectrum, liquid lithium cooled reactor. This system produces a net power of 100 kWe with a 10-year end of life, under the specific constraints of area and volume. Output of the Backup Concept is estimated to be 60 kWe for a 10-year end of life. This system differs from the Baseline Concept because currently available thermoelectric conversion is used from energy supplied by a liquid sodium cooled reactor. The Growth Concept uses Stirling engine conversion to produce 100 kWe within the constraints of mass and volume. The Growth Concept can be scaled up to produce a 1 MWe output that uses the same type reactor developed for the Baseline Concept. Assessments made for each of the program scenarios indicate the key development efforts needed to initiate detailed design and hardware program phases. Development plans were prepared for each scenario that detail the work elements and show the program activities leading to a state of flight readiness.

  9. Conceptual definition of a high voltage power supply test facility

    NASA Technical Reports Server (NTRS)

    Biess, John J.; Chu, Teh-Ming; Stevens, N. John

    1989-01-01

    NASA Lewis Research Center is presently developing a 60 GHz traveling wave tube for satellite cross-link communications. The operating voltage for this new tube is - 20 kV. There is concern about the high voltage insulation system and NASA is planning a space station high voltage experiment that will demonstrate both the 60 GHz communications and high voltage electronics technology. The experiment interfaces, requirements, conceptual design, technology issues and safety issues are determined. A block diagram of the high voltage power supply test facility was generated. It includes the high voltage power supply, the 60 GHz traveling wave tube, the communications package, the antenna package, a high voltage diagnostics package and a command and data processor system. The interfaces with the space station and the attached payload accommodations equipment were determined. A brief description of the different subsystems and a discussion of the technology development needs are presented.

  10. Westinghouse programs in pulsed homopolar power supplies

    NASA Technical Reports Server (NTRS)

    Litz, D. C.; Mullan, E.

    1984-01-01

    This document details Westinghouse's ongoing study of homopolar machines since 1929 with the major effort occurring in the early 1970's to the present. The effort has enabled Westinghouse to develop expertise in the technology required for the design, fabrication and testing of such machines. This includes electrical design, electromagnetic analysis, current collection, mechanical design, advanced cooling, stress analysis, transient rotor performance, bearing analysis and seal technology. Westinghouse is using this capability to explore the use of homopolar machines as pulsed power supplies for future systems in both military and commercial applications.

  11. An energy-harvesting power supply for underwater bridge scour monitoring sensors

    NASA Astrophysics Data System (ADS)

    Wang, Yuli; Li, Yingjie; He, Longzhuang; Shamsi, Pourya; Zheng, Yahong R.

    2018-03-01

    The natural force of scouring has become one of the most critical risk endangering the endurance of bridges, thus leading to the necessity of deploying underwater monitoring sensors to actively detect potential scour holes under bridges. Due to the difficulty in re-charging batteries for underwater sensors, super capacitors with energy harvesting (EH) means are exploited to prolong the sustainability of underwater sensors. In this paper, an energy harvesting power supply based on a helical turbine is proposed to power underwater monitoring sensors. A small helical turbine is designed to convert water flow energy to electrical energy with favorable environmental robustness. A 3-inch diameter, 2.5-inch length and 3-bladed helical turbine was designed with two types of waterproof coupling with the sensor housing. Both designs were prototyped and tested under different flow conditions and we get valid voltage around 0.91 V which is enough to power monitoring sensor. The alternating current (AC) electrical energy generated by the helical turbine is then rectified and boosted to drive a DC charger for efficiently charging one super capacitor. The charging circuit was designed, prototyped and tested thoroughly with the helical turbine harvester. The results were promising, that the overall power supply can power an underwater sensor node with wireless transceivers for long-term operations

  12. Field Trial on a Rack-mounted DC Power Supply System with 80-Ah Lithium-ion Batteries

    NASA Astrophysics Data System (ADS)

    Matsushima, Toshio

    Using an industrial lithium-ion battery that has higher energy density than conventional valve-regulated lead-acid batteries, a rack-mounted DC-power-supply system was assembled and tested at a base transceiver station (BTS) offering actual services. A nominal output voltage and maximum output current of the system is 53.5V and 20A, respectively. An 80-Ah lithium-ion battery composed of 13 cells connected in series was applied in the system and maintained in a floating charge method. The DC-power-supply system was installed in a 19-inch power rack in the telecommunications equipment box at BTS. The characteristics of the 80Ah lithium-ion battery, specifications of the DC-power-supply system and field-test results were shown in this paper.

  13. Supplying the power requirements to a sensor network using radio frequency power transfer.

    PubMed

    Percy, Steven; Knight, Chris; Cooray, Francis; Smart, Ken

    2012-01-01

    Wireless power transmission is a method of supplying power to small electronic devices when there is no wired connection. One way to increase the range of these systems is to use a directional transmitting antenna, the problem with this approach is that power can only be transmitted through a narrow beam and directly forward, requiring the transmitter to always be aligned with the sensor node position. The work outlined in this article describes the design and testing of an autonomous radio frequency power transfer system that is capable of rotating the base transmitter to track the position of sensor nodes and transferring power to that sensor node. The system's base station monitors the node's energy levels and forms a charge queue to plan charging order and maintain energy levels of the nodes. Results show a radio frequency harvesting circuit with a measured S11 value of -31.5 dB and a conversion efficiency of 39.1%. Simulation and experimentation verified the level of power transfer and efficiency. The results of this work show a small network of three nodes with different storage types powered by a central base node.

  14. Operating and Managing a Backup Control Center

    NASA Technical Reports Server (NTRS)

    Marsh, Angela L.; Pirani, Joseph L.; Bornas, Nicholas

    2010-01-01

    Due to the criticality of continuous mission operations, some control centers must plan for alternate locations in the event an emergency shuts down the primary control center. Johnson Space Center (JSC) in Houston, Texas is the Mission Control Center (MCC) for the International Space Station (ISS). Due to Houston s proximity to the Gulf of Mexico, JSC is prone to threats from hurricanes which could cause flooding, wind damage, and electrical outages to the buildings supporting the MCC. Marshall Space Flight Center (MSFC) has the capability to be the Backup Control Center for the ISS if the situation is needed. While the MSFC Huntsville Operations Support Center (HOSC) does house the BCC, the prime customer and operator of the ISS is still the JSC flight operations team. To satisfy the customer and maintain continuous mission operations, the BCC has critical infrastructure that hosts ISS ground systems and flight operations equipment that mirrors the prime mission control facility. However, a complete duplicate of Mission Control Center in another remote location is very expensive to recreate. The HOSC has infrastructure and services that MCC utilized for its backup control center to reduce the costs of a somewhat redundant service. While labor talents are equivalent, experiences are not. Certain operations are maintained in a redundant mode, while others are simply maintained as single string with adequate sparing levels of equipment. Personnel at the BCC facility must be trained and certified to an adequate level on primary MCC systems. Negotiations with the customer were done to match requirements with existing capabilities, and to prioritize resources for appropriate level of service. Because some of these systems are shared, an activation of the backup control center will cause a suspension of scheduled HOSC activities that may share resources needed by the BCC. For example, the MCC is monitoring a hurricane in the Gulf of Mexico. As the threat to MCC

  15. Research for the Cable Layout Way of the Bypass Operation System in Agricultural Power Supply Network

    NASA Astrophysics Data System (ADS)

    Niu, Jie; Li, Jinliang; Zou, Dehua; Yang, Qi; Li, Xu; Yan, Yu; Li, Tang

    2017-05-01

    Non-blackout working of agricultural power supply network is significant to shorten the outage time, decrease the outage loss, and improve the supply reliability and safety. It is impossible to hang the wire rope first and then suspend the cable because of the poor bearing ability of the pole in agricultural power supply network. A kind of new cable arrangement way, its matching tools and the flexible cable that can bear the tension by itself are needed to be put forward and developed. It is necessary to calculate the electric field intensity of the flexible cable to verify that the electric field intensity meets the insulation demand. In this new design, the fiber layer is added into the flexible cable and its maximum tension force is measured to reach to 4000 N. Based on the features of live working in the agricultural power supply network, the new layout way of the cable is proposed; the matching tools and the new flexible cable that can bear the tension by itself are developed as well in this paper. All of the research achievements can give references for the live working of the agricultural power supply network.

  16. Harmonic analysis of traction power supply system based on wavelet decomposition

    NASA Astrophysics Data System (ADS)

    Dun, Xiaohong

    2018-05-01

    With the rapid development of high-speed railway and heavy-haul transport, AC drive electric locomotive and EMU large-scale operation in the country on the ground, the electrified railway has become the main harmonic source of China's power grid. In response to this phenomenon, the need for timely monitoring of power quality problems of electrified railway, assessment and governance. Wavelet transform is developed on the basis of Fourier analysis, the basic idea comes from the harmonic analysis, with a rigorous theoretical model, which has inherited and developed the local thought of Garbor transformation, and has overcome the disadvantages such as window fixation and lack of discrete orthogonally, so as to become a more recently studied spectral analysis tool. The wavelet analysis takes the gradual and precise time domain step in the high frequency part so as to focus on any details of the signal being analyzed, thereby comprehensively analyzing the harmonics of the traction power supply system meanwhile use the pyramid algorithm to increase the speed of wavelet decomposition. The matlab simulation shows that the use of wavelet decomposition of the traction power supply system for harmonic spectrum analysis is effective.

  17. Auditory backup alarms: distance-at-first-detection via in-situ experimentation on alarm design and hearing protection effects.

    PubMed

    Alali, Khaled; Casali, John G

    2012-01-01

    The purpose of this study was to assess normal hearing listeners' performance in detecting a stationary backup alarm signal and to quantify the linear distance at detection point. Detection distances for 12 participants with normal hearing were measured while they were fitted with 7 hearing protectors and while they were unoccluded (open ear). A standard (narrowband) backup alarm signal and a broadband (pulsed white noise) backup alarm signal from Brigade[1] were used. The method of limits, with distance as the physical measurement variable and threshold detection as the task, was employed to find at which distance the participant could first detect the backup alarms. A within-subject Analysis of Variance (ANOVA) revealed a significant main effect of the listening conditions on the detection distance in feet. Post hoc analyses indicated that the Bilsom L3HV conventional passive earmuff (at 1132.2 ft detection distance) was significantly poorer compared to all other HPDs and the open ear in detection distance achieved, and that there were no statistically-significant differences between the unoccluded ear (1652.3 ft), EB-15-Lo BlastPLGTM (1546.2 ft), EB-15-Hi BlastPLGTM (1543.4 ft), E-A-R/3M Combat ArmsTM earplug-nonlinear, level-dependent state (1507.8 ft), E-A-R/3M HiFiTM earplug (1497.7 ft), and Bilsom ImpactTM dichotic electronic earmuff (1567.2 ft). In addition, the E-A-R/3M Combat ArmsTM earplug-passive steady state resulted in significantly longer detection distances than only the open ear condition, at 1474.1 ft versus 1652.3 ft for the open ear. ANOVA also revealed a significant main effect of the backup alarm type on detection distance. The means were 1600.9 ft for the standard (narrowband) backup alarm signal, and a significantly closer 1379.4 ft was required for the Brigade broadband backup alarm signal. For on-ground workers, it is crucial to detect backup alarm signals as far away as possible rather than at close distances since this will provide them

  18. 10 CFR Appendix Z to Subpart B of... - Uniform Test Method for Measuring the Energy Consumption of External Power Supplies

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... of External Power Supplies Z Appendix Z to Subpart B of Part 430 Energy DEPARTMENT OF ENERGY ENERGY... Power Supplies 1. Scope: This appendix covers the test requirements used to measure energy consumption of external power supplies. 2. Definitions: The following definitions are for the purposes of...

  19. 10 CFR Appendix Z to Subpart B of... - Uniform Test Method for Measuring the Energy Consumption of External Power Supplies

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... of External Power Supplies Z Appendix Z to Subpart B of Part 430 Energy DEPARTMENT OF ENERGY ENERGY... Power Supplies 1. Scope: This appendix covers the test requirements used to measure energy consumption of external power supplies. 2. Definitions: The following definitions are for the purposes of...

  20. BackUp: Development and evaluation of a smart-phone application for coping with suicidal crises

    PubMed Central

    Aerts, Saskia; Muijzers, Ekke; De Jaegere, Eva; van Heeringen, Kees; Portzky, Gwendolyn

    2017-01-01

    Background Suicide is a major public health issue and has large impact on the lives of many people. Innovative technologies such as smartphones could create new possibilities for suicide prevention, such as helping to overcome the barriers and stigma on help seeking in case of suicidal ideation. Due to their omnipresence, smartphone apps can offer suicide prevention tools very fast, they are easily-accessible, low-threshold and can help overcome some of the help-seeking barriers suicidal people experience. This article describes the development, testing and implementation of a mobile application for coping with suicidal crisis: BackUp. Methods Based on the analysis of literature and existing suicide prevention apps several tools were identified as relevant to include in a suicide prevention app. The selected tools (a safety planning tool, a hope box, a coping cards module, and a module to reach out) are evidence based in a face to face context, and could be easily transferred into a mobile app. The testing of existing apps and the literature also revealed important guidelines for the technical development of the application. Results BackUp was developed and tested by an expert panel (n = 9) and a panel of end users (n = 21). Both groups rated BackUp as valuable for suicide prevention. Suicidal ideation of the end user group was measured using the Beck Scale for Suicidal Ideation before and after testing BackUp, and showed a small but non-significant decrease. The majority of the testers used BackUp several times. All tools were evaluated as rather or very useable in times of suicidal crisis. Conclusion BackUp was positively evaluated and indicates that self-help tools can have a positive impact on suicidal ideation. Apps in particular create opportunities in approaching people that are not reached by traditional interventions; on the other hand they can contribute to suicide prevention in addition to regular care. However, more research is needed on the impact and

  1. Close up of backup exciter showing induction motor at left ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Close up of backup exciter showing induction motor at left and direct current generator at right. View to west - Mystic Lake Hydroelectric Facility, Powerhouse, Along West Rosebud Creek, 1 3/4 miles northeast of Mystic Lake Dam, Fishtail, Stillwater County, MT

  2. Optimized Heat Pipe Backup Cooling System Tested with a Stirling Convertor

    NASA Technical Reports Server (NTRS)

    Tarau, Calin; Schwendeman, Carl L.; Schifer, Nicholas A.; Anderson, William G.

    2016-01-01

    Advanced Stirling Radioisotope Generator (ASRG) is an attractive energy system for select space missions, and with the addition of a VCHP, it becomes even more versatile. The ASRG is powered through thermal energy from decaying radioisotopes acting as General Purpose Heat Sources (GPHS). A Stirling engine converts the thermal energy to electrical energy and cools the GPHS [2]. The Stirling convertor must operate continuously to maintain acceptable temperatures of the GPHS and protect their cladding. The addition of alkali metal VCHP allows the Stirling to cycle on and off during a mission and can be used as a backup cooling system. The benefits of being able to turn the Stirling off are: allowing for a restart of the Stirling and reducing vibrations for sensitive measurements. The VCHP addition should also increase the efficiency of the Stirling by providing a uniform temperature distribution at the heat transfer interface into the heater head.

  3. Chaos in vibrating systems with a limited power-supply.

    PubMed

    Krasnopolskaya, Tatyana S.; Shvets, Alexander Yu.

    1993-07-01

    New models and properties of forced oscillations of the various physical systems (pendulum and piezoceramic transducer) due to the interaction with the excitation device of limited power-supply are investigated in details. Using an analysis of the largest Lyapunov exponent for a complicated system-vibrating subsystem and exciter-the regions for three steady state regimes are determined, namely: stationary, periodic and chaotic.

  4. Potential for deserts to supply reliable renewable electric power

    NASA Astrophysics Data System (ADS)

    Labordena, Mercè; Lilliestam, Johan

    2015-04-01

    To avoid dangerous climate change, the electricity systems must be decarbonized by mid-century. The world has sufficient renewable electricity resources for complete power sector decarbonization, but an expansion of renewables poses several challenges for the electricity systems. First, wind and solar PV power are intermittent and supply-controlled, making it difficult to securely integrate this fluctuating generation into the power systems. Consequently, power sources that are both renewable and dispatchable, such as biomass, hydro and concentrating solar power (CSP), are particularly important. Second, renewable power has a low power density and needs vast areas of land, which is problematic both due to cost reasons and due to land-use conflicts, in particular with agriculture. Renewable and dispatchable technologies that can be built in sparsely inhabited regions or on land with low competition with agriculture would therefore be especially valuable; this land-use competition greatly limits the potential for hydro and biomass electricity. Deserts, however, are precisely such low-competition land, and are at the same time the most suited places for CSP generation, but this option would necessitate long transmission lines from remote places in the deserts to the demand centers such as big cities. We therefore study the potential for fleets of CSP plants in the large deserts of the world to produce reliable and reasonable-cost renewable electricity for regions with high and/or rapidly increasing electricity demand and with a desert within or close to its borders. The regions in focus here are the European Union, North Africa and the Middle East, China and Australia. We conduct the analysis in three steps. First, we identify the best solar generation areas in the selected deserts using geographic information systems (GIS), and applying restrictions to minimize impact on biodiversity, soils, human heath, and land-use and land-cover change. Second, we identify

  5. Back-Up Childcare: A Quality Alternative to Regular Care Which Fosters Resilience in Infants and Toddlers.

    ERIC Educational Resources Information Center

    La Bar, Nicole J.

    To many in the field of early care and education, back-up child care may be viewed as a stressful disruption that could interfere with attachment and be detrimental to continuity of care. This paper attempts to prove that high-quality back-up child care offered by employers actually fosters the development of resiliency in young children by…

  6. 33. View of data converter and power supply for TR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. View of data converter and power supply for TR system in transmitter building no. 102, mezzanine level. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  7. Modelling the EDLC-based Power Supply Module for a Maneuvering System of a Nanosatellite

    NASA Astrophysics Data System (ADS)

    Kumarin, A. A.; Kudryavtsev, I. A.

    2018-01-01

    The development of the model of the power supply module of a maneuvering system of a nanosatellite is described. The module is based on an EDLC battery as an energy buffer. The EDLC choice is described. Experiments are conducted to provide data for model. Simulation of the power supply module is made for charging and discharging of the battery processes. The difference between simulation and experiment does not exceed 0.5% for charging and 10% for discharging. The developed model can be used in early design and to adjust charger and load parameters. The model can be expanded to represent the entire power system.

  8. System-level considerations for the front-end readout ASIC in the CBM experiment from the power supply perspective

    NASA Astrophysics Data System (ADS)

    Kasinski, K.; Koczon, P.; Ayet, S.; Löchner, S.; Schmidt, C. J.

    2017-03-01

    New fixed target experiments using high intensity beams with energy up to 10 AGeV from the SIS100 synchrotron presently being constructed at FAIR/GSI are under preparation. Most of the readout electronics and power supplies are expected to be exposed to a very high flux of nuclear reaction products and have to be radiation tolerant up to 3 MRad (TID) and sustain up to 1014/cm2 of 1 MeV neutron equivalent in their life time. Moreover, the mostly minimum ionising particles under investigation leave very little signal in the sensors. Therefore very low noise level amplitude measurements are required by the front-end electronics for effective tracking. Sensor and interconnecting micro-cable capacitance and series resistance in conjunction with intrinsic noise of the charge sensitive amplifier are dominant noise sources in the system. However, the single-ended architecture of the amplifiers employed for the charge processing channels implies a potential problem with noise contributions from power supply sources. Strict system-level constraints leave very little freedom in selecting a power supply structure optimal with respect to: power efficiency, cooling capabilities and power density on modules, but also noise injection to the front-end via the power supply lines. Design of the power supply and distribution system of the Silicon Tracking System in the CBM experiment together with details on the front-end ASICs (STS -XYTER2) and measurement results of power supply and conditioning electronics (selected DC/DC converter and LDO regulators) are presented.

  9. Design of 5 V DC to 20 V DC switching regulator for power supply module

    NASA Astrophysics Data System (ADS)

    Azmi, N. A.; Murad, S. A. Z.; Harun, A.; Ismail, R. C.; Isa, M. N. M.; Zulkifeli, M. A.

    2017-09-01

    This paper presents the design of 5 V to 20 V DC switching regulator for power supply module. A voltage multiplier which consists of cascaded diode-capacitor combination is used in order to obtain a high voltage power supply. Due to power loss that has occurred in a stray of component arrangement, the proposed design employs a pulse width modulation (PWM) controller circuit with an inclusion of a capacitor, diode, and inductor components. The input supply of 5 V DC to LT1618 controller circuit has produced 20.35 V based from simulation results. Meanwhile, the measurement results of 19.36 V are obtained and the feedback signal is required for the purpose of stabilizing the output. The proposed design can reduce the components as well as the PCB size, thus minimizing the overall cost of making a switching regulator for power supply module.

  10. Official portrait of STS-65 backup Payload Specialist Jean-Jacques Favier

    NASA Image and Video Library

    1993-09-30

    Official portrait of STS-65 International Microgravity Laboratory 2 (IML-2) backup Payload Specialist Jean-Jacques Favier. Favier is a member of the Centre National D'Etudes Spatiales (CNES), the French space agency.

  11. Telecommunications equipment power supply in the Arctic by means of solar panels

    NASA Astrophysics Data System (ADS)

    Terekhin, Vladimir; Lagunov, Alexey

    2016-09-01

    Development of the Arctic region is one of the priorities in the Russian Federation. Amongst other things, a reliable telecommunications infrastructure in the Arctic is required. Petrol and diesel generators are traditionally employed but their use has considerable environmental impact. Solar panels can be used as an alternative power source. The electricity generated will be sufficient to supply small-sized telecommunications equipment with total the power of over 80 watts. An installation consisting of the solar modules, a charge controller, batteries, an inverter and load was designed. Tests were conducted at Cape Desire of the Novaya Zemlya (island). The solar panels provided in excess of 80 W from 7 a.m. to 11 p.m. The batteries charge during this time was sufficient to provide the power supply for the communication equipment during the night, from 11 p.m. to 7 a.m. The maximum value of 638 W of the power generation was observed at 3 p.m. The minimum value of 46 W was at 4 a.m. The solar modules thus can be used during the polar day to power the telecommunications equipment.

  12. Fuel cells provide a revenue-generating solution to power quality problems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    King, J.M. Jr.

    Electric power quality and reliability are becoming increasingly important as computers and microprocessors assume a larger role in commercial, health care and industrial buildings and processes. At the same time, constraints on transmission and distribution of power from central stations are making local areas vulnerable to low voltage, load addition limitations, power quality and power reliability problems. Many customers currently utilize some form of premium power in the form of standby generators and/or UPS systems. These include customers where continuous power is required because of health and safety or security reasons (hospitals, nursing homes, places of public assembly, air trafficmore » control, military installations, telecommunications, etc.) These also include customers with industrial or commercial processes which can`t tolerance an interruption of power because of product loss or equipment damage. The paper discusses the use of the PC25 fuel cell power plant for backup and parallel power supplies for critical industrial applications. Several PC25 installations are described: the use of propane in a PC25; the use by rural cooperatives; and a demonstration of PC25 technology using landfill gas.« less

  13. 14 CFR 121.643 - Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Supplemental operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...-powered airplanes: Supplemental operations. 121.643 Section 121.643 Aeronautics and Space FEDERAL AVIATION... Flight Release Rules § 121.643 Fuel supply: Nonturbine and turbo-propeller-powered airplanes... flight or takeoff a nonturbine or turbo-propeller-powered airplane unless, considering the wind and other...

  14. 14 CFR 121.643 - Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Supplemental operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...-powered airplanes: Supplemental operations. 121.643 Section 121.643 Aeronautics and Space FEDERAL AVIATION... Flight Release Rules § 121.643 Fuel supply: Nonturbine and turbo-propeller-powered airplanes... flight or takeoff a nonturbine or turbo-propeller-powered airplane unless, considering the wind and other...

  15. 14 CFR 121.643 - Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Supplemental operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...-powered airplanes: Supplemental operations. 121.643 Section 121.643 Aeronautics and Space FEDERAL AVIATION... Flight Release Rules § 121.643 Fuel supply: Nonturbine and turbo-propeller-powered airplanes... flight or takeoff a nonturbine or turbo-propeller-powered airplane unless, considering the wind and other...

  16. 30 CFR 75.1101-21 - Back-up water system.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Back-up water system. 75.1101-21 Section 75.1101-21 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY... water system. One fire hose outlet together with a length of hose capable of extending to the belt drive...

  17. 30 CFR 75.1101-21 - Back-up water system.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Back-up water system. 75.1101-21 Section 75.1101-21 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY... water system. One fire hose outlet together with a length of hose capable of extending to the belt drive...

  18. 30 CFR 75.1101-21 - Back-up water system.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Back-up water system. 75.1101-21 Section 75.1101-21 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY... water system. One fire hose outlet together with a length of hose capable of extending to the belt drive...

  19. 30 CFR 75.1101-21 - Back-up water system.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Back-up water system. 75.1101-21 Section 75.1101-21 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY... water system. One fire hose outlet together with a length of hose capable of extending to the belt drive...

  20. 30 CFR 75.1101-21 - Back-up water system.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Back-up water system. 75.1101-21 Section 75.1101-21 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY... water system. One fire hose outlet together with a length of hose capable of extending to the belt drive...

  1. Simulating cloud environment for HIS backup using secret sharing.

    PubMed

    Kuroda, Tomohiro; Kimura, Eizen; Matsumura, Yasushi; Yamashita, Yoshinori; Hiramatsu, Haruhiko; Kume, Naoto

    2013-01-01

    In the face of a disaster hospitals are expected to be able to continue providing efficient and high-quality care to patients. It is therefore crucial for hospitals to develop business continuity plans (BCPs) that identify their vulnerabilities, and prepare procedures to overcome them. A key aspect of most hospitals' BCPs is creating the backup of the hospital information system (HIS) data at multiple remote sites. However, the need to keep the data confidential dramatically increases the costs of making such backups. Secret sharing is a method to split an original secret message so that individual pieces are meaningless, but putting sufficient number of pieces together reveals the original message. It allows creation of pseudo-redundant arrays of independent disks for privacy-sensitive data over the Internet. We developed a secret sharing environment for StarBED, a large-scale network experiment environment, and evaluated its potential and performance during disaster recovery. Simulation results showed that the entire main HIS database of Kyoto University Hospital could be retrieved within three days even if one of the distributed storage systems crashed during a disaster.

  2. Thematic mapper flight model preshipment review data package. Volume 4: Appendix. Part C: Power supply data

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The acceptance test data package for the thematic mapper flight model power supply was reviewed and the data compared to the relevant specification. The power supply was found to be within specification. Final test data for outut voltage regulation and ripple, efficiency, over and undervoltage protection, telemetry, impedances, turn-on requirements, and input current limits are presented.

  3. 14 CFR 121.641 - Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Flag operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...-powered airplanes: Flag operations. 121.641 Section 121.641 Aeronautics and Space FEDERAL AVIATION... Flight Release Rules § 121.641 Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Flag operations. (a) No person may dispatch or take off a nonturbine or turbo-propeller-powered airplane unless...

  4. 14 CFR 121.641 - Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Flag operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...-powered airplanes: Flag operations. 121.641 Section 121.641 Aeronautics and Space FEDERAL AVIATION... Flight Release Rules § 121.641 Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Flag operations. (a) No person may dispatch or take off a nonturbine or turbo-propeller-powered airplane unless...

  5. 14 CFR 121.641 - Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Flag operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...-powered airplanes: Flag operations. 121.641 Section 121.641 Aeronautics and Space FEDERAL AVIATION... Flight Release Rules § 121.641 Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Flag operations. (a) No person may dispatch or take off a nonturbine or turbo-propeller-powered airplane unless...

  6. The impact of a large-scale power outage on hemodialysis center operations.

    PubMed

    Abir, Mahshid; Jan, Sophia; Jubelt, Lindsay; Merchant, Raina M; Lurie, Nicole

    2013-12-01

    On June 29, 2012, mid-Atlantic storms resulted in a large-scale power outage affecting up to three million people across multiple (US) states. Hemodialysis centers are dependent on electricity to provide dialysis care to end-stage renal disease patients. The objective of this study was to determine how the power outage impacted operations in a sample of hemodialysis centers in the impacted regions. The sample consisted of all hemodialysis centers located in the District of Columbia and a total of five counties with the largest power losses in West Virginia, Virginia, and Maryland. A semi-structured interview guide was developed, and the charge nurse or supervisor in each facility was interviewed. The survey questions addressed whether their centers lost power, if so, for how long, where their patients received dialysis, whether their centers had backup generators, and if so, whether they had any problems operating them, and whether their center received patients from other centers if they had power. Calls were placed to 90 dialysis centers in the sampled areas and a 90% response rate was achieved. Overall, hemodialysis operations at approximately 30% (n = 24) of the centers queried were impacted by the power outage. Of the 36 centers that lost power, 31% (n = 11) referred their patients to other dialysis centers, 22% (n = 8) accommodated their patients during a later shift or on a different day; the rest of the centers either experienced brief power outages that did not affect operations or experienced a power outage on days that the center is usually closed. Some centers in the study cohort reported receiving patients from other centers for dialysis 33% (n = 27). Thirty-two percent (n = 26) of the centers queried had backup generators on site. Eleven percent (n = 4) of the centers experiencing power outages reported that backup generators were brought in by their parent companies. Comprehensive emergency planning for dialysis centers should include provisions for

  7. 14 CFR 121.645 - Fuel supply: Turbine-engine powered airplanes, other than turbo propeller: Flag and supplemental...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Fuel supply: Turbine-engine powered airplanes, other than turbo propeller: Flag and supplemental operations. 121.645 Section 121.645 Aeronautics... SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.645 Fuel supply: Turbine-engine powered...

  8. 14 CFR 121.645 - Fuel supply: Turbine-engine powered airplanes, other than turbo propeller: Flag and supplemental...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Fuel supply: Turbine-engine powered airplanes, other than turbo propeller: Flag and supplemental operations. 121.645 Section 121.645 Aeronautics... SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.645 Fuel supply: Turbine-engine powered...

  9. 14 CFR 121.645 - Fuel supply: Turbine-engine powered airplanes, other than turbo propeller: Flag and supplemental...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Fuel supply: Turbine-engine powered airplanes, other than turbo propeller: Flag and supplemental operations. 121.645 Section 121.645 Aeronautics... SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.645 Fuel supply: Turbine-engine powered...

  10. Research on Matching Method of Power Supply Parameters for Dual Energy Source Electric Vehicles

    NASA Astrophysics Data System (ADS)

    Jiang, Q.; Luo, M. J.; Zhang, S. K.; Liao, M. W.

    2018-03-01

    A new type of power source is proposed, which is based on the traffic signal matching method of the dual energy source power supply composed of the batteries and the supercapacitors. First, analyzing the power characteristics is required to meet the excellent dynamic characteristics of EV, studying the energy characteristics is required to meet the mileage requirements and researching the physical boundary characteristics is required to meet the physical conditions of the power supply. Secondly, the parameter matching design with the highest energy efficiency is adopted to select the optimal parameter group with the method of matching deviation. Finally, the simulation analysis of the vehicle is carried out in MATLABSimulink, The mileage and energy efficiency of dual energy sources are analyzed in different parameter models, and the rationality of the matching method is verified.

  11. A 5 kA pulsed power supply for inductive and plasma loads in large volume plasma device.

    PubMed

    Srivastava, P K; Singh, S K; Sanyasi, A K; Awasthi, L M; Mattoo, S K

    2016-07-01

    This paper describes 5 kA, 12 ms pulsed power supply for inductive load of Electron Energy Filter (EEF) in large volume plasma device. The power supply is based upon the principle of rapid sourcing of energy from the capacitor bank (2.8 F/200 V) by using a static switch, comprising of ten Insulated Gate Bipolar Transistors (IGBTs). A suitable mechanism is developed to ensure equal sharing of current and uniform power distribution during the operation of these IGBTs. Safe commutation of power to the EEF is ensured by the proper optimization of its components and by the introduction of over voltage protection (>6 kV) using an indigenously designed snubber circuit. Various time sequences relevant to different actions of power supply, viz., pulse width control and repetition rate, are realized through optically isolated computer controlled interface.

  12. A 5 kA pulsed power supply for inductive and plasma loads in large volume plasma device

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Srivastava, P. K., E-mail: pkumar@ipr.res.in; Singh, S. K.; Sanyasi, A. K.

    This paper describes 5 kA, 12 ms pulsed power supply for inductive load of Electron Energy Filter (EEF) in large volume plasma device. The power supply is based upon the principle of rapid sourcing of energy from the capacitor bank (2.8 F/200 V) by using a static switch, comprising of ten Insulated Gate Bipolar Transistors (IGBTs). A suitable mechanism is developed to ensure equal sharing of current and uniform power distribution during the operation of these IGBTs. Safe commutation of power to the EEF is ensured by the proper optimization of its components and by the introduction of over voltagemore » protection (>6 kV) using an indigenously designed snubber circuit. Various time sequences relevant to different actions of power supply, viz., pulse width control and repetition rate, are realized through optically isolated computer controlled interface.« less

  13. Monitoring apparatus and method for battery power supply

    DOEpatents

    Martin, Harry L.; Goodson, Raymond E.

    1983-01-01

    A monitoring apparatus and method are disclosed for monitoring and/or indicating energy that a battery power source has then remaining and/or can deliver for utilization purposes as, for example, to an electric vehicle. A battery mathematical model forms the basis for monitoring with a capacity prediction determined from measurement of the discharge current rate and stored battery parameters. The predicted capacity is used to provide a state-of-charge indication. Self-calibration over the life of the battery power supply is enacted through use of a feedback voltage based upon the difference between predicted and measured voltages to correct the battery mathematical model. Through use of a microprocessor with central information storage of temperature, current and voltage, system behavior is monitored, and system flexibility is enhanced.

  14. Development of effective power supply using electric double layer capacitor for static magnetic field coils in fusion plasma experiments.

    PubMed

    Inomoto, M; Abe, K; Yamada, T; Kuwahata, A; Kamio, S; Cao, Q H; Sakumura, M; Suzuki, N; Watanabe, T; Ono, Y

    2011-02-01

    A cost-effective power supply for static magnetic field coils used in fusion plasma experiments has been developed by application of an electric double layer capacitor (EDLC). A prototype EDLC power supply system was constructed in the form of a series LCR circuit. Coil current of 100 A with flat-top longer than 1 s was successfully supplied to an equilibrium field coil of a fusion plasma experimental apparatus by a single EDLC module with capacitance of 30 F. The present EDLC power supply has revealed sufficient performance for plasma confinement experiments whose discharge duration times are an order of several seconds.

  15. Influence of the power supply parameters on the projectile energy in the permanent magnet electrodynamic accelerator

    NASA Astrophysics Data System (ADS)

    Waindok, Andrzej; Piekielny, Paweł

    2017-10-01

    The main objective of the research is to investigate, how the power supply parameters influence the kinetic energy of the movable element, called commonly a projectile or bullet. A calculation and measurement results of transient characteristics for an electrodynamic accelerator with permanent magnet support were presented in the paper. The calculations were made with using field-circuit model, which includes the parameters of the power supply, mass of the bullet and friction phenomenon. Characteristics of energy and muzzle velocity verso supply voltage (50 V to 350 V) and capacitance value (60 mF to 340.5 mF) were determined, as well. A measurement verification of selected points of calculation characteristics were carried out for investigated values of muzzle velocity. A good conformity between calculation and measurement results was obtained. Concluding, presented characteristics of the muzzle velocity and energy of the projectile vs. power supply parameters indicate, that accelerators could be used for fatigue testing of materials.

  16. A Switching-Mode Power Supply Design Tool to Improve Learning in a Power Electronics Course

    ERIC Educational Resources Information Center

    Miaja, P. F.; Lamar, D. G.; de Azpeitia, M.; Rodriguez, A.; Rodriguez, M.; Hernando, M. M.

    2011-01-01

    The static design of ac/dc and dc/dc switching-mode power supplies (SMPS) relies on a simple but repetitive process. Although specific spreadsheets, available in various computer-aided design (CAD) programs, are widely used, they are difficult to use in educational applications. In this paper, a graphic tool programmed in MATLAB is presented,…

  17. Geothermal Power Supply Systems around the World and in Russia: State of the Art and Future Prospects

    NASA Astrophysics Data System (ADS)

    Butuzov, V. A.; Amerkhanov, R. A.; Grigorash, O. V.

    2018-05-01

    Solar and geothermal energy systems are shown to have received the widest use among all kinds of renewable sources of energy for heat supply purposes around the world. The power capacities and amounts of thermal energy generated by solar and geothermal heat supply systems around the world are presented by way of comparison. The thermal power capacity of solar heat supply systems installed around the world as of 2015 totaled 268.1 GW, and the thermal energy generated by them amounted to 225 TW h/year. The thermal power capacity of geothermal heat supply systems installed around the world totaled 70.3 GW, and the thermal energy generated by them amounted to 163 TW h/year. Information on the geothermal heat supply systems in the leading countries around the world based on the data reported at the World Geothermal Congress held in 2015 is presented. It is shown that China, with the installed thermal power capacities of its geothermal heat supply stations totaling 17.87 GW and the amount of thermal energy generated per annum equal to 48.435 TW h/year, is the world's leader in this respect. The structures of geothermal heat supply systems by the kinds of heat consumption used around the world are presented. The systems equipped with geothermal heat pumps accounted for 70.95% in the total installed capacity and for 55.3% in the total amount of generated heat. For systems that do not use heat pumps, those serving for pools account for the largest share amounting to 44.74% in installed capacity and to 45.43% in generated heat. A total of 2218 geothermal wells with the total length equal to 9534 km (with 38.7% of them for heat supply purposes) were drilled in 42 countries in the period from 2010 to 2014. In Russia, geothermal heat supply systems are in operation mainly in Dagestan, in Krasnodar krai, and in Kamchatka. The majority of these systems have been made without breaking the stream after the well outlet. A cyclic control arrangement is also used. The combined

  18. STS-47 Payload Specialist Mohri and Japanese backups pose in SLJ module at KSC

    NASA Technical Reports Server (NTRS)

    1992-01-01

    STS-47 payload specialists representing Japan's National Space Development Agency (NASDA) examine the interior of the Spacelab Japan (SLJ) laboratory module recently installed in Endeavour's, Orbiter Vehicle (OV) 105's, payload bay (PLB). Left to right are Payload Specialist Mamoru Mohri, backup Payload Specialist Chiaki Naito-Mukai, and backup Payload Specialist Takao Doi. The crewmembers visited OV-105, currently undergoing preflight processing in a high bay area of Kennedy Space Center's (KSC's) Orbiter Processing Facility (OPF). View provided by KSC with alternate KSC number KSC-92PC-1649.

  19. Wind power systems for individual applications. [electric power supplies for homes

    NASA Technical Reports Server (NTRS)

    Clews, H. M.

    1973-01-01

    A small windpower system is described which is suitable for electrifying a house. The self-contained unit consists of a two kilowatt wind driven generator, a set of 19 storage batteries, a small dc to ac inverter, and a gasoline generator for use as an emergency backup system in case of prolonged calm periods. Cost effectiveness of the electricity generated by this windmill system comes out to about 15 cents per kilowatt hour - assuming a 10 year life for the batteries and a 20 year life for the other components. Some other small windpower systems are also described, and it is shown that a windpowered generator in the 15- to 25-kilowatt output range coupled to a direct heated water storage system is able to heat a typical New England home.

  20. Mechanical Backup For Fly-By-Wire Control System

    NASA Technical Reports Server (NTRS)

    Stewart, Eric C.

    1992-01-01

    Mechanical device eliminates need for redundant fly-by-wire subsystems. Main components are two linkages. One connected to control column in conventional, reversible control system. Other slides inside first linkage and connected to pilot's control wheel. In addition to aircraft applications, design used in control systems in which computer control desirable but safety backup systems required; for example, in boat rudders, engine controls in boats and automobiles, and controls in construction equipment.

  1. STS-55 German payload specialists and backups pose in front of SL-D2 at KSC

    NASA Technical Reports Server (NTRS)

    1992-01-01

    STS-55 Columbia, Orbiter Vehicle (OV) 102, German payload specialists and backup (alternate) payload specialists pose in front of the Spacelab Deutsche 2 (SL-D2) science module at a Kennedy Space Center (KSC) processing facility. These four Germans have been assigned to support the STS-55/SL-D2 mission. Left to right are Payload Specialist 2 Hans Schlegel, backup Payload Specialist Dr. P. Gerhard Thiele (kneeling), Payload Specialist 1 Ulrich Walter, and backup Payload Specialist Renate Brummer. Walter and Schlegel are scheduled to fly aboard OV-102 for the mission while Brummer and Thiele will serve as alternates and fill supportive roles on the ground. Clearly visible on the SL-D2 module are the European Space Agency (ESA) insignia, the feedthrough plate, and the D2 insignia.

  2. Flexible operation strategy for environment control system in abnormal supply power condition

    NASA Astrophysics Data System (ADS)

    Liping, Pang; Guoxiang, Li; Hongquan, Qu; Yufeng, Fang

    2017-04-01

    This paper establishes an optimization method that can be applied to the flexible operation of the environment control system in an abnormal supply power condition. A proposed conception of lifespan is used to evaluate the depletion time of the non-regenerative substance. The optimization objective function is to maximize the lifespans. The optimization variables are the allocated powers of subsystems. The improved Non-dominated Sorting Genetic Algorithm is adopted to obtain the pareto optimization frontier with the constraints of the cabin environmental parameters and the adjustable operating parameters of the subsystems. Based on the same importance of objective functions, the preferred power allocation of subsystems can be optimized. Then the corresponding running parameters of subsystems can be determined to ensure the maximum lifespans. A long-duration space station with three astronauts is used to show the implementation of the proposed optimization method. Three different CO2 partial pressure levels are taken into consideration in this study. The optimization results show that the proposed optimization method can obtain the preferred power allocation for the subsystems when the supply power is at a less-than-nominal value. The method can be applied to the autonomous control for the emergency response of the environment control system.

  3. Visibility of children behind 2010-2013 model year passenger vehicles using glances, mirrors, and backup cameras and parking sensors.

    PubMed

    Kidd, David G; Brethwaite, Andrew

    2014-05-01

    This study identified the areas behind vehicles where younger and older children are not visible and measured the extent to which vehicle technologies improve visibility. Rear visibility of targets simulating the heights of a 12-15-month-old, a 30-36-month-old, and a 60-72-month-old child was assessed in 21 2010-2013 model year passenger vehicles with a backup camera or a backup camera plus parking sensor system. The average blind zone for a 12-15-month-old was twice as large as it was for a 60-72-month-old. Large SUVs had the worst rear visibility and small cars had the best. Increases in rear visibility provided by backup cameras were larger than the non-visible areas detected by parking sensors, but parking sensors detected objects in areas near the rear of the vehicle that were not visible in the camera or other fields of view. Overall, backup cameras and backup cameras plus parking sensors reduced the blind zone by around 90 percent on average and have the potential to prevent backover crashes if drivers use the technology appropriately. Copyright © 2014 Elsevier Ltd. All rights reserved.

  4. Load controller and method to enhance effective capacity of a photovoltaic power supply using a dynamically determined expected peak loading

    DOEpatents

    Perez, Richard

    2005-05-03

    A load controller and method are provided for maximizing effective capacity of a non-controllable, renewable power supply coupled to a variable electrical load also coupled to a conventional power grid. Effective capacity is enhanced by monitoring power output of the renewable supply and loading, and comparing the loading against the power output and a load adjustment threshold determined from an expected peak loading. A value for a load adjustment parameter is calculated by subtracting the renewable supply output and the load adjustment parameter from the current load. This value is then employed to control the variable load in an amount proportional to the value of the load control parameter when the parameter is within a predefined range. By so controlling the load, the effective capacity of the non-controllable, renewable power supply is increased without any attempt at operational feedback control of the renewable supply.

  5. DC switching regulated power supply for driving an inductive load

    DOEpatents

    Dyer, George R.

    1986-01-01

    A power supply for driving an inductive load current from a dc power supply hrough a regulator circuit including a bridge arrangement of diodes and switching transistors controlled by a servo controller which regulates switching in response to the load current to maintain a selected load current. First and second opposite legs of the bridge are formed by first and second parallel-connected transistor arrays, respectively, while the third and fourth legs of the bridge are formed by appropriately connected first and second parallel connected diode arrays, respectively. The regulator may be operated in three "stages" or modes: (1) For current runup in the load, both first and second transistor switch arrays are turned "on" and current is supplied to the load through both transistor arrays. (2) When load current reaches the desired level, the first switch is turned "off", and load current "flywheels" through the second switch array and the fourth leg diode array connecting the second switch array in series with the load. Current is maintained by alternating between modes 1 and 2 at a suitable duty cycle and switching rate set by the controller. (3) Rapid current rundown is accomplished by turning both switch arrays "off", allowing load current to be dumped back into the source through the third and fourth diode arrays connecting the source in series opposition with the load to recover energy from the inductive load. The three operating states are controlled automatically by the controller.

  6. An audible automobile back-up pedestrian warning device--development and evaluation

    DOT National Transportation Integrated Search

    1976-11-01

    The purpose of the study was to develop and field-test an audible back-up warning device for use on automobiles. Detailed criteria of pedestrian age and hearing ability combined with noise characteristics of typical accident sites provide the basis f...

  7. Distributed intrusion monitoring system with fiber link backup and on-line fault diagnosis functions

    NASA Astrophysics Data System (ADS)

    Xu, Jiwei; Wu, Huijuan; Xiao, Shunkun

    2014-12-01

    A novel multi-channel distributed optical fiber intrusion monitoring system with smart fiber link backup and on-line fault diagnosis functions was proposed. A 1× N optical switch was intelligently controlled by a peripheral interface controller (PIC) to expand the fiber link from one channel to several ones to lower the cost of the long or ultra-long distance intrusion monitoring system and also to strengthen the intelligent monitoring link backup function. At the same time, a sliding window auto-correlation method was presented to identify and locate the broken or fault point of the cable. The experimental results showed that the proposed multi-channel system performed well especially whenever any a broken cable was detected. It could locate the broken or fault point by itself accurately and switch to its backup sensing link immediately to ensure the security system to operate stably without a minute idling. And it was successfully applied in a field test for security monitoring of the 220-km-length national borderline in China.

  8. Outcomes of nonemergent percutaneous coronary intervention with and without on-site surgical backup: a meta-analysis.

    PubMed

    Singh, Param Puneet; Singh, Mukesh; Bedi, Updesh Singh; Adigopula, Sasikanth; Singh, Sarabjeet; Kodumuri, Vamsi; Molnar, Janos; Ahmed, Aziz; Arora, Rohit; Khosla, Sandeep

    2011-01-01

    Despite major advances in percutaneous coronary intervention (PCI) techniques, the current guidelines recommend against elective PCI at hospitals without on-site cardiac surgery backup. Nonetheless, an increasing number of hospitals without on-site cardiac surgery in the United States have developed programs for elective PCI. Studies evaluating outcome in this setting have yielded mixed results, leaving the question unanswered. Hence, a meta-analysis comparing outcomes of nonemergent PCI in hospitals with and without on-site surgical backup was performed. A systematic review of literature identified four studies involving 6817 patients. Three clinical end points were extracted from each study and included in-hospital death, myocardial infarction, and the need for emergency coronary artery bypass grafting. The studies were homogenous for each outcome studied. Therefore, the combined relative risks (RRs) across all the studies and the 95% confidence intervals (CIs) were computed using the Mantel-Haenszel fixed-effect model. A two-sided alpha error less than 0.05 was considered to be statistically significant. Compared with facilities with on-site surgical backup, the risk of in-hospital death (RR, 2.7; CI, 0.6-12.9; P = 0.18), nonfatal myocardial infarction (RR, 1.3; CI, 0.7- 2.2; P = 0.29), and need of emergent coronary artery bypass grafting (RR, 0.46; CI, 0.06- 3.1; P = 0.43) was similar in those lacking on-site surgical backup. The present meta-analysis suggests that there is no difference in the outcome with regard to risk of nonfatal myocardial infarction, need for emergency coronary artery bypass grafting, and the risk of death in patients undergoing elective PCI in hospitals with and without on-site cardiac surgery backup.

  9. 17 CFR 250.14 - Exemption of acquisitions of securities of power supply companies from section 9(a)(2) of the Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... securities of power supply companies from section 9(a)(2) of the Act. 250.14 Section 250.14 Commodity and... of securities of power supply companies from section 9(a)(2) of the Act. (a) An electric utility... exempt from section 9(a)(2) of the Act with respect to the acquisition of any security of a power supply...

  10. 17 CFR 250.14 - Exemption of acquisitions of securities of power supply companies from section 9(a)(2) of the Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... securities of power supply companies from section 9(a)(2) of the Act. 250.14 Section 250.14 Commodity and... of securities of power supply companies from section 9(a)(2) of the Act. (a) An electric utility... exempt from section 9(a)(2) of the Act with respect to the acquisition of any security of a power supply...

  11. Development of Power Supply Management Module for Radio Signal Repeaters of Automatic Metering Reading System in Variable Solar Density Conditions

    NASA Astrophysics Data System (ADS)

    Kondratjevs, K.; Zabasta, A.; Selmanovs-Pless, V.

    2016-02-01

    In recent years, there has been significant research focus that revolves around harvesting and minimising energy consumption by wireless sensor network nodes. When a sensor node is depleted of energy, it becomes unresponsive and disconnected from the network that can significantly influence the performance of the whole network. The purpose of the present research is to create a power supply management module in order to provide stable operating voltage for autonomous operations of radio signal repeaters, sensors or gateways of WSN. The developed management module is composed of a solar panel, lithium battery and power supply management module. The novelty of the research is the management module, which ensures stable and uninterrupted operations of electronic equipment in various power supply modes in different situations, simultaneously ensuring energy protection and sustainability of the module components. The management module is able to provide power supply of 5 V for electronics scheme independently, without power interruption switching between power sources and power flows in different directions.

  12. Supplier selection criteria for sustainable supply chain management in thermal power plant

    NASA Astrophysics Data System (ADS)

    Firoz, Faisal; Narayan Biswal, Jitendra; Satapathy, Suchismita

    2018-02-01

    Supplies are always in great demand when it comes to industrial operations. The quality of raw material their price accompanied by sustainability and environmental effects are a major concern for industrial operators these days. Supply Chain Management is the subject which is focused on how the supply of different products is carried out. The motive is that each operation performed can be optimized and inherently the efficiency of the whole chain is integrated. In this paper we will be dealing with all the criteria that are required to be evaluated before selecting a supplier, in particular, focusing on Thermal Power Plant. The most suppliers of the thermal power plant are the coal suppliers. The quality of coal directly determines the efficiency of the whole plant. And when there are matters concerning coal environmental pollution plays a very crucial role. ANP method has been used here to select suppliers of thermal power sectors in Indian context. After applying ANP to prioritize the sustainable supplier selection criteria, it is found that for thermal power industries best suppliers are Nationalized/State owned suppliers then 2nd ranked suppliers are imported supplier. Private owned suppliers are ranked least. So private owned suppliers must be more concerned about their performance. Among these suppliers it is found that to compete in the global market privatized suppliers have to give more emphasize on most important criteria like sustainability, then fuel cost and quality. Still some sub-criteria like a clean program, environmental issues, quality, reliability, service rate, investment in high technology, green transportation channel, waste management etc needs for continuous improvement as per their priority.

  13. Climate and water resource change impacts and adaptation potential for US power supply

    NASA Astrophysics Data System (ADS)

    Miara, Ariel; Macknick, Jordan E.; Vörösmarty, Charles J.; Tidwell, Vincent C.; Newmark, Robin; Fekete, Balazs

    2017-11-01

    Power plants that require cooling currently (2015) provide 85% of electricity generation in the United States. These facilities need large volumes of water and sufficiently cool temperatures for optimal operations, and projected climate conditions may lower their potential power output and affect reliability. We evaluate the performance of 1,080 thermoelectric plants across the contiguous US under future climates (2035-2064) and their collective performance at 19 North American Electric Reliability Corporation (NERC) sub-regions. Joint consideration of engineering interactions with climate, hydrology and environmental regulations reveals the region-specific performance of energy systems and the need for regional energy security and climate-water adaptation strategies. Despite climate-water constraints on individual plants, the current power supply infrastructure shows potential for adaptation to future climates by capitalizing on the size of regional power systems, grid configuration and improvements in thermal efficiencies. Without placing climate-water impacts on individual plants in a broader power systems context, vulnerability assessments that aim to support adaptation and resilience strategies misgauge the extent to which regional energy systems are vulnerable. Climate-water impacts can lower thermoelectric reserve margins, a measure of systems-level reliability, highlighting the need to integrate climate-water constraints on thermoelectric power supply into energy planning, risk assessments, and system reliability management.

  14. Magnetic Random Access Memory based non-volatile asynchronous Muller cell for ultra-low power autonomous applications

    NASA Astrophysics Data System (ADS)

    Di Pendina, G.; Zianbetov, E.; Beigne, E.

    2015-05-01

    Micro and nano electronic integrated circuit domain is today mainly driven by the advent of the Internet of Things for which the constraints are strong, especially in terms of power consumption and autonomy, not only during the computing phases but also during the standby or idle phases. In such ultra-low power applications, the circuit has to meet new constraints mainly linked to its changing energetic environment: long idle phases, automatic wake up, data back-up when the circuit is sporadically turned off, and ultra-low voltage power supply operation. Such circuits have to be completely autonomous regarding their unstable environment, while remaining in an optimum energetic configuration. Therefore, we propose in this paper the first MRAM-based non-volatile asynchronous Muller cell. This cell has been simulated and characterized in a very advanced 28 nm CMOS fully depleted silicon-on-insulator technology, presenting good power performance results due to an extremely efficient body biasing control together with ultra-wide supply voltage range from 160 mV up to 920 mV. The leakage current can be reduced to 154 pA thanks to reverse body biasing. We also propose an efficient standard CMOS bulk version of this cell in order to be compatible with different fabrication processes.

  15. The AP1000{sup R} nuclear power plant innovative features for extended station blackout mitigation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vereb, F.; Winters, J.; Schulz, T.

    2012-07-01

    Station Blackout (SBO) is defined as 'a condition wherein a nuclear power plant sustains a loss of all offsite electric power system concurrent with turbine trip and unavailability of all onsite emergency alternating current (AC) power system. Station blackout does not include the loss of available AC power to buses fed by station batteries through inverters or by alternate AC sources as defined in this section, nor does it assume a concurrent single failure or design basis accident...' in accordance with Reference 1. In this paper, the innovative features of the AP1000 plant design are described with their operation inmore » the scenario of an extended station blackout event. General operation of the passive safety systems are described as well as the unique features which allow the AP1000 plant to cope for at least 7 days during station blackout. Points of emphasis will include: - Passive safety system operation during SBO - 'Fail-safe' nature of key passive safety system valves; automatically places the valve in a conservatively safe alignment even in case of multiple failures in all power supply systems, including normal AC and battery backup - Passive Spent Fuel Pool cooling and makeup water supply during SBO - Robustness of AP1000 plant due to the location of key systems, structures and components required for Safe Shutdown - Diverse means of supplying makeup water to the Passive Containment Cooling System (PCS) and the Spent Fuel Pool (SFP) through use of an engineered, safety-related piping interface and portable equipment, as well as with permanently installed onsite ancillary equipment. (authors)« less

  16. Simple constant-current-regulated power supply

    NASA Technical Reports Server (NTRS)

    Priebe, D. H. E.; Sturman, J. C.

    1977-01-01

    Supply incorporates soft-start circuit that slowly ramps current up to set point at turn-on. Supply consists of full-wave rectifier, regulating pass transistor, current feedback circuit, and quad single-supply operational-amplifier circuit providing control. Technique is applicable to any system requiring constant dc current, such as vacuum tube equipment, heaters, or battery charges; it has been used to supply constant current for instrument calibration.

  17. Power supply improvements for ballasts-low pressure mercury/argon discharge lamp for water purification

    NASA Astrophysics Data System (ADS)

    Bokhtache, A. Aissa; Zegaoui, A.; Djahbar, A.; Allouache, H.; Hemici, K.; Kessaissia, F. Z.; Bouchrit, M. S.; Aillerie, M.

    2017-02-01

    The low-pressure electrical discharges established in the mercury rare gas mixtures are the basis of many applications both in the field of lighting and for industrial applications. In order to select an efficient high frequency power supply (ECG -based PWM inverter), we present and discuss results obtained in the simulation of three kinds of power supplies delivering a 0.65 A - 50KHz sinusoidal current dedicated to power low pressure UV Mercury - Argon lamp used for effect germicide on water treatment thus allowing maximum UVC radiation at 253.7 nm. Three ballasts half-bridge configurations were compared with criteria based on resulting germicide efficiency, electrical yield and reliability, for example the quality of the sinusoidal current with reduced THD, and finally, we also considered in this analysis the final economic aspect.

  18. STS-9 payload specialist Merbold and backup Ockels in training session

    NASA Technical Reports Server (NTRS)

    1983-01-01

    STS-9 payload specialist Ulf Merbold, right, a West German physicist and backup Wubbo Ockels, a Dutch scientist, are pictured in a training session in JSC's Shuttle mockup and integration laboratory. In this view Ockels appears to be showing Merbold how to operate a camera.

  19. 30 CFR 57.14132 - Horns and backup alarms for surface equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... NONMETAL MINES Machinery and Equipment Safety Devices and Maintenance Requirements § 57.14132 Horns and backup alarms for surface equipment. (a) Manually-operated horns or other audible warning devices provided on self-propelled mobile equipment as a safety device shall be maintained in a functional...

  20. The amino acid's backup bone - storage solutions for proteomics facilities.

    PubMed

    Meckel, Hagen; Stephan, Christian; Bunse, Christian; Krafzik, Michael; Reher, Christopher; Kohl, Michael; Meyer, Helmut Erich; Eisenacher, Martin

    2014-01-01

    Proteomics methods, especially high-throughput mass spectrometry analysis have been continually developed and improved over the years. The analysis of complex biological samples produces large volumes of raw data. Data storage and recovery management pose substantial challenges to biomedical or proteomic facilities regarding backup and archiving concepts as well as hardware requirements. In this article we describe differences between the terms backup and archive with regard to manual and automatic approaches. We also introduce different storage concepts and technologies from transportable media to professional solutions such as redundant array of independent disks (RAID) systems, network attached storages (NAS) and storage area network (SAN). Moreover, we present a software solution, which we developed for the purpose of long-term preservation of large mass spectrometry raw data files on an object storage device (OSD) archiving system. Finally, advantages, disadvantages, and experiences from routine operations of the presented concepts and technologies are evaluated and discussed. This article is part of a Special Issue entitled: Computational Proteomics in the Post-Identification Era. Guest Editors: Martin Eisenacher and Christian Stephan. Copyright © 2013. Published by Elsevier B.V.

  1. Flywheel induction motor-generator for magnet power supply in small fusion device

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hatakeyma, S., E-mail: hatakeyama.shoichi@torus.nr.titech.ac.jp; Yoshino, F.; Tsutsui, H.

    2016-04-15

    A flywheel motor-generator (MG) for the toroidal field (TF) coils of a small fusion device was developed which utilizes a commercially available squirrel-cage induction motor. Advantages of the MG are comparably-long duration, quick power response, and easy implementation of power control compared with conventional capacitor-type power supply. A 55-kW MG was fabricated, and TF coils of a small fusion device were energized. The duration of the current flat-top was extended to 1 s which is much longer than those of conventional small devices (around 10–100 ms).

  2. Flywheel induction motor-generator for magnet power supply in small fusion device.

    PubMed

    Hatakeyma, S; Yoshino, F; Tsutsui, H; Tsuji-Iio, S

    2016-04-01

    A flywheel motor-generator (MG) for the toroidal field (TF) coils of a small fusion device was developed which utilizes a commercially available squirrel-cage induction motor. Advantages of the MG are comparably-long duration, quick power response, and easy implementation of power control compared with conventional capacitor-type power supply. A 55-kW MG was fabricated, and TF coils of a small fusion device were energized. The duration of the current flat-top was extended to 1 s which is much longer than those of conventional small devices (around 10-100 ms).

  3. Apollo 9 backup crew on "Retriever"-Ships

    NASA Image and Video Library

    1968-12-06

    S68-51700 (November 1968) --- The backup crew of the Apollo 9 (Spacecraft 104/ Lunar Module 3/ Saturn 504) space mission stands on the deck of the NASA Motor Vessel Retriever (MVR) prior to participating in water egress training in the Gulf of Mexico. Left to right, are astronauts Charles Conrad Jr. (holding hatch), Richard F. Gordon Jr., and Alan L. Bean. They are standing by the Apollo command module trainer which was used in the exercise. Since this photograph was made, these three astronauts have been named as the prime crew of the Apollo 12 lunar landing mission.

  4. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...

  5. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...

  6. 46 CFR 161.002-9 - Automatic fire detecting system, power supply.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... system must meet the requirements of § 113.10-9 of subchapter J (Electrical Engineering Regulations) of... 46 Shipping 6 2013-10-01 2013-10-01 false Automatic fire detecting system, power supply. 161.002-9..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Fire-Protective Systems § 161.002...

  7. 46 CFR 161.002-9 - Automatic fire detecting system, power supply.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... system must meet the requirements of § 113.10-9 of subchapter J (Electrical Engineering Regulations) of... 46 Shipping 6 2014-10-01 2014-10-01 false Automatic fire detecting system, power supply. 161.002-9..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Fire-Protective Systems § 161.002...

  8. 46 CFR 161.002-9 - Automatic fire detecting system, power supply.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... system must meet the requirements of § 113.10-9 of subchapter J (Electrical Engineering Regulations) of... 46 Shipping 6 2012-10-01 2012-10-01 false Automatic fire detecting system, power supply. 161.002-9..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Fire-Protective Systems § 161.002...

  9. DC switching regulated power supply for driving an inductive load

    DOEpatents

    Dyer, G.R.

    1983-11-29

    A dc switching regulated power supply for driving an inductive load is provided. The regulator basic circuit is a bridge arrangement of diodes and transistors. First and second opposite legs of the bridge are formed by first and second parallel-connected transistor arrays, respectively, while the third and fourth legs of the bridge are formed by appropriately connected first and second parallel connected diode arrays, respectively. A dc power supply is connected to the input of the bridge and the output is connected to the load. A servo controller is provided to control the switching rate of the transistors to maintain a desired current to the load. The regulator may be operated in three stages or modes: (1) for current runup in the load, both first and second transistor switch arrays are turned on and current is supplied to the load through both transistor arrays. (2) When load current reaches the desired level, the first switch is turned off, and load current flywheels through the second switch array and the fourth leg diode array connecting the second switch array in series with the load. Current is maintained by alternating between modes 1 and 2 at a suitable duty cycle and switching rate set by the controller. (3) Rapid current rundown is accomplished by turning both switch arrays off, allowing load current to be dumped back into the source through the third and fourth diode arrays connecting the source in series opposition with the load to recover energy from the inductive load.

  10. Load controller and method to enhance effective capacity of a photovotaic power supply using a dynamically determined expected peak loading

    DOEpatents

    Perez, Richard

    2003-04-01

    A load controller and method are provided for maximizing effective capacity of a non-controllable, renewable power supply coupled to a variable electrical load also coupled to a conventional power grid. Effective capacity is enhanced by monitoring power output of the renewable supply and loading, and comparing the loading against the power output and a load adjustment threshold determined from an expected peak loading. A value for a load adjustment parameter is calculated by subtracting the renewable supply output and the load adjustment parameter from the current load. This value is then employed to control the variable load in an amount proportional to the value of the load control parameter when the parameter is within a predefined range. By so controlling the load, the effective capacity of the non-controllable, renewable power supply is increased without any attempt at operational feedback control of the renewable supply. The expected peak loading of the variable load can be dynamically determined within a defined time interval with reference to variations in the variable load.

  11. Design of the klystron filament power supply control system for EAST LHCD

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wu, Zege; Wang, Mao; Hu, Huaichuan

    A filament is a critical component of the klystron used to heat the cathode. There are totally 44 klystrons in experimental advanced superconducting tokamak (EAST) lower hybrid current drive (LHCD) systems. All klystron filaments are powered by AC power suppliers through isolated transformers. In order to achieve better klystron preheat, a klystron filament power supply control system is designed to obtain the automatic control of all filament power suppliers. Klystron filament current is measured by PLC and the interlock between filament current and klystron high voltage system is also implemented. This design has already been deployed in two LHCD systemsmore » and proves feasible completely.« less

  12. 26 CFR 31.3406-0 - Outline of the backup withholding regulations.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... incorrect name/TIN combination. (2) Definition of account. (3) Definition of business day. (4) Certain exceptions. (c) Notice regarding an incorrect name/TIN combination. (1) In general. (2) Additional... of receipt. (d) Notice from payors of backup withholding due to an incorrect name/TIN combination. (1...

  13. Development of D+3He Fusion Electric Thrusters and Power Supplies for Space

    NASA Astrophysics Data System (ADS)

    Morse, Thomas M.

    1994-07-01

    Development of D+3He Fusion Electric Thrusters (FET) and Power Supplies (FPS) should occur at a lunar base because of the following: availability of helium-3, a vacuum better than on Earth, low K in shade reachable by radiant cooling, supply of ``high temp'' superconducting ceramic-metals, and a low G environment. The early FET will be much smaller than an Apollo engine, with specific impulse of 10,000-100,000-s. Solar power and low G will aid early development. To counter the effect of low G on humans, centrifuges will be employed for sleeping and resting. Work will be done by telerobotic view control. The FPS will be of comparable size, and will generate power mainly by having replaceable rectennas, resonant to the fusion synchrotron radiation. FPSs are used for house keeping power and initiating superconduction. Spaceships will carry up to ten FETs and two FPSs. In addition to fusion fuel, the FET will inject H or Li low mass propellant into the fusion chamber. Developing an FET would be difficult on Earth. FET spaceships will park between missions in L1, and an FET Bus will fetch humans/supplies from Moon and Earth. Someday FETs, with rocket assist, will lift spaceships from Earth, and make space travel to planets far cheaper, faster, and safer, than at present. Too long a delay due to the space station, or the huge cost of getting into space by current means, will damage the morale of the space program.

  14. Multicast backup reprovisioning problem for Hamiltonian cycle-based protection on WDM networks

    NASA Astrophysics Data System (ADS)

    Din, Der-Rong; Huang, Jen-Shen

    2014-03-01

    As networks grow in size and complexity, the chance and the impact of failures increase dramatically. The pre-allocated backup resources cannot provide 100% protection guarantee when continuous failures occur in a network. In this paper, the multicast backup re-provisioning problem (MBRP) for Hamiltonian cycle (HC)-based protection on WDM networks for the link-failure case is studied. We focus on how to recover the protecting capabilities of Hamiltonian cycle against the subsequent link-failures on WDM networks for multicast transmissions, after recovering the multicast trees affected by the previous link-failure. Since this problem is a hard problem, an algorithm, which consists of several heuristics and a genetic algorithm (GA), is proposed to solve it. The simulation results of the proposed method are also given. Experimental results indicate that the proposed algorithm can solve this problem efficiently.

  15. High Input Voltage Discharge Supply for High Power Hall Thrusters Using Silicon Carbide Devices

    NASA Technical Reports Server (NTRS)

    Pinero, Luis R.; Scheidegger, Robert J.; Aulsio, Michael V.; Birchenough, Arthur G.

    2014-01-01

    A power processing unit for a 15 kW Hall thruster is under development at NASA Glenn Research Center. The unit produces up to 400 VDC with two parallel 7.5 kW discharge modules that operate from a 300 VDC nominal input voltage. Silicon carbide MOSFETs and diodes were used in this design because they were the best choice to handle the high voltage stress while delivering high efficiency and low specific mass. Efficiencies in excess of 97 percent were demonstrated during integration testing with the NASA-300M 20 kW Hall thruster. Electromagnet, cathode keeper, and heater supplies were also developed and will be integrated with the discharge supply into a vacuum-rated brassboard power processing unit with full flight functionality. This design could be evolved into a flight unit for future missions that requires high power electric propulsion.

  16. Climate and water resource change impacts and adaptation potential for US power supply

    DOE PAGES

    Miara, Ariel; Macknick, Jordan E.; Vorosmarty, Charles J.; ...

    2017-10-30

    Power plants that require cooling currently (2015) provide 85% of electricity generation in the United States. These facilities need large volumes of water and sufficiently cool temperatures for optimal operations, and projected climate conditions may lower their potential power output and affect reliability. We evaluate the performance of 1,080 thermoelectric plants across the contiguous US under future climates (2035-2064) and their collective performance at 19 North American Electric Reliability Corporation (NERC) sub-regions. Joint consideration of engineering interactions with climate, hydrology and environmental regulations reveals the region-specific performance of energy systems and the need for regional energy security and climate-water adaptationmore » strategies. Despite climate-water constraints on individual plants, the current power supply infrastructure shows potential for adaptation to future climates by capitalizing on the size of regional power systems, grid configuration and improvements in thermal efficiencies. Without placing climate-water impacts on individual plants in a broader power systems context, vulnerability assessments that aim to support adaptation and resilience strategies misgauge the extent to which regional energy systems are vulnerable. As a result, climate-water impacts can lower thermoelectric reserve margins, a measure of systems-level reliability, highlighting the need to integrate climate-water constraints on thermoelectric power supply into energy planning, risk assessments, and system reliability management.« less

  17. Climate and water resource change impacts and adaptation potential for US power supply

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miara, Ariel; Macknick, Jordan E.; Vorosmarty, Charles J.

    Power plants that require cooling currently (2015) provide 85% of electricity generation in the United States. These facilities need large volumes of water and sufficiently cool temperatures for optimal operations, and projected climate conditions may lower their potential power output and affect reliability. We evaluate the performance of 1,080 thermoelectric plants across the contiguous US under future climates (2035-2064) and their collective performance at 19 North American Electric Reliability Corporation (NERC) sub-regions. Joint consideration of engineering interactions with climate, hydrology and environmental regulations reveals the region-specific performance of energy systems and the need for regional energy security and climate-water adaptationmore » strategies. Despite climate-water constraints on individual plants, the current power supply infrastructure shows potential for adaptation to future climates by capitalizing on the size of regional power systems, grid configuration and improvements in thermal efficiencies. Without placing climate-water impacts on individual plants in a broader power systems context, vulnerability assessments that aim to support adaptation and resilience strategies misgauge the extent to which regional energy systems are vulnerable. As a result, climate-water impacts can lower thermoelectric reserve margins, a measure of systems-level reliability, highlighting the need to integrate climate-water constraints on thermoelectric power supply into energy planning, risk assessments, and system reliability management.« less

  18. Influence of backup bearings and support structure dynamics on the behavior of rotors with active supports

    NASA Technical Reports Server (NTRS)

    Flowers, George T.

    1994-01-01

    Progress over the past year includes the following: A simplified rotor model with a flexible shaft and backup bearings has been developed. A simple rotor model which includes a flexible disk and bearings with clearance has been developed and the dynamics of the model investigated. A rotor model based upon the T-501 engine has been developed which includes backup bearing effects. Parallel simulation runs are being conducted using an ANSYS based finite element model of the T-501. The magnetic bearing test rig is currently floating and dynamics/control tests are being conducted. A paper has been written that documents the work using the T-501 engine model. Work has continued with the simplified model. The finite element model is currently being modified to include the effects of foundation dynamics. A literature search for material on foil bearings has been conducted. A finite element model is being developed for a magnetic bearing in series with a foil backup bearing.

  19. Cost analysis of concepts for a demand oriented biogas supply for flexible power generation.

    PubMed

    Hahn, Henning; Ganagin, Waldemar; Hartmann, Kilian; Wachendorf, Michael

    2014-10-01

    With the share of intermittent renewable energies within the electricity system rising, balancing services from dispatchable power plants are of increasing importance. Highlighting the importance of the need to keeping fuel costs for flexible power generation to a minimum, the study aims to identify favourable biogas plant configurations, supplying biogas on demand. A cost analysis of five configurations based on biogas storing and flexible biogas production concepts has been carried out. Results show that additional flexibility costs for a biogas supply of 8h per day range between 2€ and 11€MWh(-1) and for a 72h period without biogas demand from 9€ to 19€MWh(-1). While biogas storage concepts were identified as favourable short term supply configurations, flexible biogas production concepts profit from reduced storage requirements at plants with large biogas production capacities or for periods of several hours without biogas demand. Copyright © 2014 Elsevier Ltd. All rights reserved.

  20. 38 CFR 17.230 - Contingency backup to the Department of Defense.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2010-07-01 2010-07-01 false Contingency backup to the Department of Defense. 17.230 Section 17.230 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS... the Department of Defense. (a) Priority care to active duty personnel. The Secretary, during and/or...

  1. 38 CFR 17.230 - Contingency backup to the Department of Defense.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2011-07-01 2011-07-01 false Contingency backup to the Department of Defense. 17.230 Section 17.230 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS... the Department of Defense. (a) Priority care to active duty personnel. The Secretary, during and/or...

  2. 38 CFR 17.230 - Contingency backup to the Department of Defense.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2012-07-01 2012-07-01 false Contingency backup to the Department of Defense. 17.230 Section 17.230 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS... the Department of Defense. (a) Priority care to active duty personnel. The Secretary, during and/or...

  3. 38 CFR 17.230 - Contingency backup to the Department of Defense.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2014-07-01 2014-07-01 false Contingency backup to the Department of Defense. 17.230 Section 17.230 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS... the Department of Defense. (a) Priority care to active duty personnel. The Secretary, during and/or...

  4. 38 CFR 17.230 - Contingency backup to the Department of Defense.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2013-07-01 2013-07-01 false Contingency backup to the Department of Defense. 17.230 Section 17.230 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS... the Department of Defense. (a) Priority care to active duty personnel. The Secretary, during and/or...

  5. Clinical experiences utilizing wireless remote control and an ASP model backup archive for a disaster recovery event

    NASA Astrophysics Data System (ADS)

    Liu, Brent J.; Documet, Luis; Documet, Jorge; Huang, H. K.; Muldoon, Jean

    2004-04-01

    An Application Service Provider (ASP) archive model for disaster recovery for Saint John"s Health Center (SJHC) clinical PACS data has been implemented using a Fault-Tolerant Archive Server at the Image Processing and Informatics Laboratory, Marina del Rey, CA (IPIL) since mid-2002. The purpose of this paper is to provide clinical experiences with the implementation of an ASP model backup archive in conjunction with handheld wireless technologies for a particular disaster recovery scenario, an earthquake, in which the local PACS archive and the hospital are destroyed and the patients are moved from one hospital to another. The three sites involved are: (1) SJHC, the simulated disaster site; (2) IPIL, the ASP backup archive site; and (3) University of California, Los Angeles Medical Center (UCLA), the relocated patient site. An ASP backup archive has been established at IPIL to receive clinical PACS images daily using a T1 line from SJHC for backup and disaster recovery storage. Procedures were established to test the network connectivity and data integrity on a regular basis. In a given disaster scenario where the local PACS archive has been destroyed and the patients need to be moved to a second hospital, a wireless handheld device such as a Personal Digital Assistant (PDA) can be utilized to route images to the second hospital site with a PACS and reviewed by radiologists. To simulate this disaster scenario, a wireless network was implemented within the clinical environment in all three sites: SJHC, IPIL, and UCLA. Upon executing the disaster scenario, the SJHC PACS archive server simulates a downtime disaster event. Using the PDA, the radiologist at UCLA can query the ASP backup archive server at IPIL for PACS images and route them directly to UCLA. Implementation experiences integrating this solution within the three clinical environments as well as the wireless performance are discussed. A clinical downtime disaster scenario was implemented and successfully

  6. Comparative life cycle assessment of biogas plant configurations for a demand oriented biogas supply for flexible power generation.

    PubMed

    Hahn, Henning; Hartmann, Kilian; Bühle, Lutz; Wachendorf, Michael

    2015-03-01

    The environmental performance of biogas plant configurations for a demand - oriented biogas supply for flexible power generation is comparatively assessed in this study. Those configurations indicate an increased energy demand to operate the operational enhancements compared to conventional biogas plants supplying biogas for baseload power generation. However, findings show that in contrast to an alternative supply of power generators with natural gas, biogas supplied on demand by adapted biogas plant configurations saves greenhouse gas emissions by 54-65 g CO(2-eq) MJ(-1) and primary energy by about 1.17 MJ MJ(-1). In this regard, configurations with flexible biogas production profit from reduced biogas storage requirements and achieve higher savings compared to configurations with continuous biogas production. Using thicker biogas storage sheeting material reduces the methane permeability of up to 6m(3) d(-1) which equals a reduction of 8% of the configuration's total methane emissions. Copyright © 2014 Elsevier Ltd. All rights reserved.

  7. Development of the Optimum Operation Scheduling Model of Domestic Electric Appliances for the Supply-Demand Adjustment in a Power System

    NASA Astrophysics Data System (ADS)

    Ikegami, Takashi; Iwafune, Yumiko; Ogimoto, Kazuhiko

    The high penetration of variable renewable generation such as Photovoltaic (PV) systems will cause the issue of supply-demand imbalance in a whole power system. The activation of the residential power usage, storage and generation by sophisticated scheduling and control using the Home Energy Management System (HEMS) will be needed to balance power supply and demand in the near future. In order to evaluate the applicability of the HEMS as a distributed controller for local and system-wide supply-demand balances, we developed an optimum operation scheduling model of domestic electric appliances using the mixed integer linear programming. Applying this model to several houses with dynamic electricity prices reflecting the power balance of the total power system, it was found that the adequate changes in electricity prices bring about the shift of residential power usages to control the amount of the reverse power flow due to excess PV generation.

  8. Study of the Power Supply Ripple Effect on teh Dynamics at SPEAR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terebilo, A.; Pellegrini, C.; /UCLA

    For long term stability analysis time variation of tunes is important. We have proposed and tested a technique for measuring the magnitude of this variation. This was made possible by using tune extraction algorithms that require small number of turns thus giving an instantaneous tune of the machine. In this paper we demonstrate the measured effect of the tune modulation with 60 Hz power supplies ripple, power line interference from SLAC linac operating at 30 Hz repetition rate, and nonperiodic variation.

  9. Electricity by intermittent sources: An analysis based on the German situation 2012

    NASA Astrophysics Data System (ADS)

    Wagner, Friedrich

    2014-02-01

    The 2012 data of the German load, the on- and offshore and the photo-voltaic energy production are used and scaled to the limit of supplying the annual demand (100% case). The reference mix of the renewable energy (RE) forms is selected such that the remaining back-up energy is minimised. For the 100% case, the RE power installation has to be about 3 times the present peak load. The back-up system can be reduced by 12% in this case. The surplus energy corresponds to 26% of the demand. The back-up system and more so the grid must be able to cope with large power excursions. All components of the electricity supply system operate at low capacity factors. Large-scale storage can hardly be motivated by the effort to further reduce CO2 emission. Demand-side management will intensify the present periods of high economic activities. Its rigorous implementation will expand the economic activities into the weekends. On the basis of a simple criterion, the increase of periods with negative electricity prices in Germany is assessed. It will be difficult with RE to meet the low CO2 emission factors which characterise those European Countries which produce electricity mostly by nuclear and hydro power.

  10. Techno-economic study of a distributed hybrid renewable energy system supplying electrical power and heat for a rural house in China

    NASA Astrophysics Data System (ADS)

    Yuan, Jindou; Xu, Jinliang; Wang, Yaodong

    2018-03-01

    Energy saving and emission reduction have become targets for modern society due to the potential energy crisis and the threat of climate change. A distributed hybrid renewable energy system (HRES) consists of photovoltaic (PV) arrays, a wood-syngas combined heat and power generator (CHP) and back-up batteries is designed to power a typical semi-detached rural house in China which aims to meet the energy demand of a house and to reduce greenhouse gas emissions from the use of fossil fuels. Based on the annual load information of the house and the local meteorological data including solar radiation, air temperature, etc., a system model is set up using HOMER software and is used to simulate all practical configurations to carry out technical and economic evaluations. The performance of the whole HRES system and each component under different configurations are evaluated. The optimized configuration of the system is found

  11. jsc2017e136055 - On a snowy night at Red Square in Moscow, Expedition 54-55 backup crewmember Jeanette Epps of NASA lays flowers at the Kremlin Wall where Russian space icons are interred in traditional pre-launch ceremonies Nov. 30. Looking on are backup

    NASA Image and Video Library

    2017-11-30

    jsc2017e136055 - On a snowy night at Red Square in Moscow, Expedition 54-55 backup crewmember Jeanette Epps of NASA lays flowers at the Kremlin Wall where Russian space icons are interred in traditional pre-launch ceremonies Nov. 30. Looking on are backup crewmembers Sergey Prokopyev of the Russian Federal Space Agency (Roscosmos, left) and Alexander Gerst of the European Space Agency. They are backups to Anton Shkaplerov of Roscosmos, Scott Tingle of NASA and Norishige Kanai of the Japan Aerospace Exploration Agency (JAXA), who will launch from the Baikonur Cosmodrome in Kazakhstan on the Soyuz MS-07 spacecraft Dec. 17 for a five-month mission on the International Space Station...Andrey Shelepin/Gagarin Cosmonaut Training Center.

  12. A -100 kV Power Supply for Ion Acceleration in Space-based Mass Spectrometers

    NASA Astrophysics Data System (ADS)

    Gilbert, J. A.; Zurbuchen, T.; Battel, S.

    2017-12-01

    High voltage power supplies are used in many space-based time-of-flight (TOF) mass spectrometer designs to accelerate incoming ions and increase the probability of their measurement and proper identification. Ions are accelerated in proportion to their charge state, so singly charged ions such as pickup ions are accelerated less than their multiple-charge state solar wind counterparts. This lack of acceleration results in pickup ion measurements with lower resolution and without determinations of absolute energy. Acceleration reduces the effects of angular scattering and energy straggling when ions pass through thin membranes such as carbon foils, and it brings ion energies above the detection threshold of traditional solid state detectors. We have developed a power supply capable of operating at -100 kV for ion acceleration while also delivering up to 10 W of power for the operation of a floating TOF system. We also show results of benchtop calibration and ion beam tests to demonstrate the functionality and success of this approach.

  13. A right hemisphere safety backup at work: hypotheses for deep hypnosis, post-traumatic stress disorder, and dissociation identity disorder.

    PubMed

    Burnand, Gordon

    2013-09-01

    Problem theory points to an a priori relation between six key problems of living, to which people have adapted through evolution. Children are guided through the problems one by one, learning to switch between them automatically and unawares. The first problem of raising hope of certainty (about the environment), is dealt with in the right hemisphere (RH). The second of raising hope of freedom (or power to control), is dealt with in the left hemisphere (LH). Here adventurousness and ignoring the goodness of outcomes potentially create recklessness. When uncertainty rises the RH activates a backup with an override that substitutes immobility, takes over sensory inputs, but allows obedience to parental commands, and a cut-out that stops new work on the freedom problem. Support for the use of the backup by infants is found in the immobility that precedes the crying in strange conditions, and in childhood EEGs. The hypothesis that the backup is active in deep hypnosis imposes accord on findings that appear contradictory. For example it accounts for why observations during deep hypnosis emphasize the activity of the RH, but observations of responsive people not under hypnosis emphasize the activity of the LH. The hypothesis that the backup is active in post-traumatic stress disorder (PTSD) is supported by (a) fMRI observations that could reflect the cut-out, in that part of the precuneus has low metabolism, (b) the recall of motionlessness at the time of the trauma, (c) an argument that playing dead as a defence against predators is illogical, (d) the ease of hypnosis. With dissociative identity disorder (DID), the theory is consistent with up to six alters that have executive control and one trauma identity state where childhood traumas are re-experienced. Support for the cut-out affecting the trauma identity state comes from suppression of part of the precuneus and other parts of the parietal lobe when the trauma identity state is salient and a general script about a

  14. Military Curricula for Vocational & Technical Education. Basic Electricity and Electronics. CANTRAC A-100-0010. Module 20: Solid State Power Supplies; 20T: Electron Tube Power Supplies. Study Booklet.

    ERIC Educational Resources Information Center

    Chief of Naval Education and Training Support, Pensacola, FL.

    This set of individualized learning modules on power supplies is one in a series of modules for a course in basic electricity and electronics. The course is one of a number of military-developed curriculum packages selected for adaptation to vocational instructional and curriculum development in a civilian setting. Two modules are included in the…

  15. Analysis of Power Supply Heating Effect during High Temperature Experiments Based on the Electromagnetic Steel Teeming Technology

    NASA Astrophysics Data System (ADS)

    He, Ming; Wang, Qiang; Liu, Xin'an; Shi, Chunyang; Liu, Tie; He, Jicheng

    2017-04-01

    For further lowering inclusions and improving the quality of steel, a new electromagnetic steel-teeming technology based on electromagnetic induction heating was proposed. To assess the proposed technology, an experimental platform that imitates the actual production condition of steelmakers was established. High temperature experiments were performed to investigate the melting length of Fe-C alloy under different power and frequency conditions. The heating effect was analyzed, and the method of magnetic shielding to reduce the power loss of power supply was put forward. The results show that when the power is 40 kW and frequency is 25 kHz, the melting length of the Fe-C alloy is 89.2 mm in 120 s, which meets the requirements of steel teeming. In addition, when magnetic shielding material is installed under the induction coil, the power loss is reduced by about 64 %, effectively improving the heating effect of power supply.

  16. Very low noise AC/DC power supply systems for large detector arrays.

    PubMed

    Arnaboldi, C; Baù, A; Carniti, P; Cassina, L; Giachero, A; Gotti, C; Maino, M; Passerini, A; Pessina, G

    2015-12-01

    In this work, we present the first part of the power supply system for the CUORE and LUCIFER arrays of bolometric detectors. For CUORE, it consists of AC/DC commercial power supplies (0-60 V output) followed by custom DC/DC modules (48 V input, ±5 V to ±13.5 V outputs). Each module has 3 floating and independently configurable output voltages. In LUCIFER, the AC/DC + DC/DC stages are combined into a commercial medium-power AC/DC source. At the outputs of both setups, we introduced filters with the aim of lowering the noise and to protect the following stages from high voltage spikes that can be generated by the energy stored in the cables after the release of accidental short circuits. Output noise is very low, as required: in the 100 MHz bandwidth the RMS level is about 37 μV(RMS) (CUORE setup) and 90 μV(RMS) (LUCIFER setup) at a load of 7 A, with a negligible dependence on the load current. Even more importantly, high frequency switching disturbances are almost completely suppressed. The efficiency of both systems is above 85%. Both systems are completely programmable and monitored via CAN bus (optically coupled).

  17. Magnetic Random Access Memory based non-volatile asynchronous Muller cell for ultra-low power autonomous applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Di Pendina, G., E-mail: gregory.dipendina@cea.fr, E-mail: eldar.zianbetov@cea.fr, E-mail: edith.beigne@cea.fr; Zianbetov, E., E-mail: gregory.dipendina@cea.fr, E-mail: eldar.zianbetov@cea.fr, E-mail: edith.beigne@cea.fr; CNRS, SPINTEC, F-38000 Grenoble

    2015-05-07

    Micro and nano electronic integrated circuit domain is today mainly driven by the advent of the Internet of Things for which the constraints are strong, especially in terms of power consumption and autonomy, not only during the computing phases but also during the standby or idle phases. In such ultra-low power applications, the circuit has to meet new constraints mainly linked to its changing energetic environment: long idle phases, automatic wake up, data back-up when the circuit is sporadically turned off, and ultra-low voltage power supply operation. Such circuits have to be completely autonomous regarding their unstable environment, while remainingmore » in an optimum energetic configuration. Therefore, we propose in this paper the first MRAM-based non-volatile asynchronous Muller cell. This cell has been simulated and characterized in a very advanced 28 nm CMOS fully depleted silicon-on-insulator technology, presenting good power performance results due to an extremely efficient body biasing control together with ultra-wide supply voltage range from 160 mV up to 920 mV. The leakage current can be reduced to 154 pA thanks to reverse body biasing. We also propose an efficient standard CMOS bulk version of this cell in order to be compatible with different fabrication processes.« less

  18. Using backup generators for meeting peak electricity demand: a sensitivity analysis on emission controls, location, and health endpoints.

    PubMed

    Gilmore, Elisabeth A; Adams, Peter J; Lave, Lester B

    2010-05-01

    Generators installed for backup power during blackouts could help satisfy peak electricity demand; however, many are diesel generators with nonnegligible air emissions that may damage air quality and human health. The full (private and social) cost of using diesel generators with and without emission control retrofits for fine particulate matter (PM2.5) and nitrogen oxides (NOx) were compared with a new natural gas turbine peaking plant. Lower private costs were found for the backup generators because the capital costs are mostly ascribed to reliability. To estimate the social costs from air quality, the changes in ambient concentrations of ozone (O3) and PM2.5 were modeled using the Particulate Matter Comprehensive Air Quality Model with extensions (PMCAMx) chemical transport model. These air quality changes were translated to their equivalent human health effects using concentration-response functions and then into dollars using estimates of "willingness-to-pay" to avoid ill health. As a case study, 1000 MW of backup generation operating for 12 hr/day for 6 days in each of four eastern U.S. cities (Atlanta, Chicago, Dallas, and New York) was modeled. In all cities, modeled PM2.5 concentrations increased (up to 5 microg/m3) due mainly to primary emissions. Smaller increases and decreases were observed for secondary PM2.5 with more variation between cities. Increases in NOx, emissions resulted in significant nitrate formation (up to 1 microg/m3) in Atlanta and Chicago. The NOx emissions also caused O3 decreases in the urban centers and increases in the surrounding areas. For PM2.5, a social cost of approximately $2/kWh was calculated for uncontrolled diesel generators in highly populated cities but was under 10 cent/kWh with PM2.5 and NOx controls. On a full cost basis, it was found that properly controlled diesel generators are cost-effective for meeting peak electricity demand. The authors recommend NOx and PM2.5 controls.

  19. STS-52 backup Payload Specialist Tryggvason during JSC bailout exercises

    NASA Technical Reports Server (NTRS)

    1992-01-01

    STS-52 Columbia, Orbiter Vehicle (OV) 102, backup Payload Specialist Bjarni V. Tryggvason, wearing launch and entry suit (LES), checks his launch and entry helmet (LEH) fitting prior to participating in emergency egress (bailout) training exercises in JSC's Weightless Environment Training Facility (WETF) Bldg 29. The WETF's 25-ft deep pool will serve as the ocean during this water landing simulation. Tryggvason represents the Canadian Space Agency (CSA).

  20. A proposed national wind power R and D program. [offshore wind power system for electric energy supplies

    NASA Technical Reports Server (NTRS)

    Heronemus, W.

    1973-01-01

    An offshore wind power system is described that consists of wind driven electrical dc generators mounted on floating towers in offshore waters. The output from the generators supplies underwater electrolyzer stations in which water is converted into hydrogen and oxygen. The hydrogen is piped to shore for conversion to electricity in fuel cell stations. It is estimated that this system can produce 159 x 10 to the ninth power kilowatt-hours per year. It is concluded that solar energy - and that includes wind energy - is the only way out of the US energy dilemma in the not too distant future.