Sample records for base operations contractor

  1. The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security Support Services Contract

    DTIC Science & Technology

    2017-03-07

    H 7 , 2 0 1 7 Report No. DODIG-2017-062 The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security...The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security Support Services Contract March 7, 2017... contractor performance for the Kuwait Base Operations and Security Support Services (KBOSSS) contract. The KBOSSS contract is a cost-plus-award-fee

  2. Analysis of non-fatal and fatal injury rates for mine operator and contractor employees and the influence of work location.

    PubMed

    Karra, Vijia K

    2005-01-01

    Mining injury surveillance data are used as the basis for assessing the severity of injuries among operator and contractor employees in the underground and surface mining of various minerals. Injury rates during 1983-2002 derived from Mine Safety and Health Administration (MSHA) database are analyzed using the negative binomial regression model. The logarithmic mean injury rate is expressed as a linear function of seven indicator variables representing Non-Coal Contractor, Metal Operator, Non Metal Operator, Stone Operator, Sand and Gravel Operator, Coal Contractor, and Work Location, and a continuous variable, RelYear, representing the relative year starting with 1983 as the base year. Based on the model, the mean injury rate declined at a 1.69% annual rate, and the mean injury rate for work on the surface is 52.53% lower compared to the rate for work in the underground. With reference to the Coal Operator mean injury rate: the Non-Coal Contractor rate is 30.34% lower, the Metal Operator rate is 27.18% lower, the Non-Metal Operator rate is 37.51% lower, the Stone Operator rate is 23.44% lower, the Sand and Gravel Operator rate is 16.45% lower, and the Coal Contractor rate is 1.41% lower. Fatality rates during the same 20 year period are analyzed similarly using Poisson regression model. Based on this model, the mean fatality rate declined at a 3.17% annual rate, and the rate for work on the surface is 64.3% lower compared to the rate for work in the underground. With reference to the Coal Operator mean fatality rate: the Non-Coal Contractor rate is 234.81% higher, the Metal Operator rate is 5.79% lower, the Non-Metal Operator rate is 47.36% lower, the Stone Operator rate is 8.29% higher, the Sand and Gravel Operator rate is 60.32% higher, and the Coal Contractor rate is 129.54% higher.

  3. HOW THE MILITARY CAN INTEGRATE UNMANNED AERIAL SYSTEMS IN THE CIVIL RESERVE AIR FLEET

    DTIC Science & Technology

    2016-10-01

    brings new capabilities and continues to fundamentally impact military doctrine and strategy, particularly in how civilian operators or contractors ...missions has stretched military personnel and resources thin. General Atomics, a California-based defense contractor , produces the highly successful MQ-1...and a large number of support personnel required to operate UAS missions. An already established civilian contractor presence AU/ACSC/2016 5

  4. Improvement of force health protection through preventive medicine oversight of contractor support.

    PubMed

    Mower, Scott A

    2009-01-01

    Unprecedented numbers of contractors are used throughout the Iraq theater of operations to alleviate military manpower shortages. At virtually every major forward operating base, US-based contractors perform the preponderance of essential life support services. At more remote sites, local national contractors are increasingly relied upon to maintain chemical latrines, remove trash, deliver bulk water, and execute other janitorial functions. Vigorous oversight of contractor performance is essential to ensure services are delivered according to specified standards. Poor oversight can increase the risk of criminal activities, permit substandard performance, elevate disease and nonbattle injury rates, degrade morale, and diminish Soldier readiness. As the principal force health protection proponents in the Department of Defense, preventive medicine units must be tightly integrated into the oversight processes. This article defines the force health protection implications associated with service contracts and provide recommendations for strengthening preventive medicine's oversight role.

  5. Subaru FATS (fault tracking system)

    NASA Astrophysics Data System (ADS)

    Winegar, Tom W.; Noumaru, Junichi

    2000-07-01

    The Subaru Telescope requires a fault tracking system to record the problems and questions that staff experience during their work, and the solutions provided by technical experts to these problems and questions. The system records each fault and routes it to a pre-selected 'solution-provider' for each type of fault. The solution provider analyzes the fault and writes a solution that is routed back to the fault reporter and recorded in a 'knowledge-base' for future reference. The specifications of our fault tracking system were unique. (1) Dual language capacity -- Our staff speak both English and Japanese. Our contractors speak Japanese. (2) Heterogeneous computers -- Our computer workstations are a mixture of SPARCstations, Macintosh and Windows computers. (3) Integration with prime contractors -- Mitsubishi and Fujitsu are primary contractors in the construction of the telescope. In many cases, our 'experts' are our contractors. (4) Operator scheduling -- Our operators spend 50% of their work-month operating the telescope, the other 50% is spent working day shift at the base facility in Hilo, or day shift at the summit. We plan for 8 operators, with a frequent rotation. We need to keep all operators informed on the current status of all faults, no matter the operator's location.

  6. 76 FR 49650 - Private Security Contractors (PSCs) Operating in Contingency Operations, Combat Operations or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-11

    ...] Private Security Contractors (PSCs) Operating in Contingency Operations, Combat Operations or Other..., ``Contractor Personnel Authorized to Accompany the U.S. Armed Forces,'' which provides guidance for all DoD contractors operating in contingency operations. This Rule was published as an Interim Final Rule on July 17...

  7. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  8. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  9. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  10. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  11. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  12. 48 CFR 970.4402 - Contractor purchasing system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402 Contractor purchasing system. ...

  13. Report on audit of Department of Energy`s contractor salary increase fund

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-04

    The Department of Energy (Department) uses contractors to operate its facilities and compensates contractor employees based on their skills, complexity of jobs, and work performance. Thirty-one of the Department`s major contractors reported a total payroll of $4.3 billion and $4.4 billion during 1994 and 1995, respectively. The 31 contractors also reported awarding salary increases of $18 million for 1994 and $200 million for 1995. The purpose of the audit was to review the process used to determine and approve the amount of salary increases for contractor employees. The specific audit objective was to determine whether salary increases received by contractormore » employees were in accordance with Departmental policies and procedures. The Department of Energy Acquisition Regulation (DEAR) requires that contractor salary actions be within specific limitations, supportable, and approved prior to incurrence of costs. In addition, the Secretary of Energy imposed a 1 year salary freeze on the merit portion of management and operating contractor employee salaries for each contractor`s Fiscal Year 1994 compensation year. However, a fund for promotions and adjustments was approved but limited to 0.5 percent of payroll for the year. A review of eight major contractors showed that six complied with the Department`s policies on salary increases. The other two gave salary increases that were not always in accordance with Departmental policies. This resulted in both contractors not fully complying with the pay freeze in 1994 and exceeding their salary increase fund budgets in 1995. If these two contractors had implemented Department and contract requirements and contracting officers had properly performed their contract administrative responsibilities concerning salary increase funds, both contractors would have frozen salary increases and would not have exceeded their annual budgets.« less

  14. Summary Report - Inspections of DoD Facilities and Military Housing and Audits of Base Operations and Support Services Contracts

    DTIC Science & Technology

    2016-10-14

    not holding contractors accountable for poor performance while constructing and maintaining facilities. These systemic problems resulted in...portfolio was about $880 billion at the end of FY 2015. Between 2003 and 2008, 18 U.S. military and contractor personnel electrocution fatalities...maintenance of DoD facilities. For instance, Report No. DODIG-2013-099 stated that installations “lacked qualified Government or contractor electricians

  15. Plans for Assessing Contractor Performance for the Camp Lemonnier Base Operations Support Contract Needed Improvement

    DTIC Science & Technology

    2015-08-27

    ensure the functional assessment plans ( FAP ) for the three services contained all contractor work requiring assessment, measurable performance...review the FAPs after development and revisions to the FAPs , and did not require additional controls over the contractor assessment process in an...revised as follows: • Business Management System B-14.3 was updated to require the contract officer representative conduct a FAP review to ensure

  16. Enabling Operational Reach and Endurance: The Use of Contractors During World War II

    DTIC Science & Technology

    2016-05-26

    Enabling Operational Reach and Endurance: The Use of Contractors During World War II A...TITLE AND SUBTITLE 5a. CONTRACT NUMBER Enabling Operational Reach and Endurance: The Use of Contractors During World War II 5b. GRANT NUMBER 5c...Army Operating Concept does not address the use or incorporation of contractors to augment force structure in the event of a militarized response

  17. 48 CFR 970.4402-2 - General requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402-2 General requirements. The following shall apply to the purchasing systems of management and operating contractors: (a) The objective of a management and operating contractor's purchasing system is to...

  18. 76 FR 16838 - Finding of No Significant Impact; Notice of Availability of the Finding of No Significant Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... Male, Non-US Citizen, Criminal Aliens at a Contractor-Owned, Contractor-Operated Correctional Facility... aliens within one existing contractor owned, contractor operated facility. Background Information Growth... criminal aliens. In response, the BOP is seeking flexibility in managing its current shortage of beds by...

  19. VISION-BASED MONITORING AND CONTROL OF CONSTRUCTION OPERATIONS CARBON FOOTPRINT

    EPA Science Inventory

    Automated and continuous carbon footprint monitoring of construction operations support the contractors and project managers with information required for assessment on carbon footprint of various construction operation alternatives. This can ultimately lead to reduction of...

  20. Pooling knowledge and improving safety for contracted works at a large industrial park.

    PubMed

    Agnello, Patrizia; Ansaldi, Silvia; Bragatto, Paolo

    2015-01-01

    At a large chemical park maintenance is contracted by the major companies operating the plants to many small firms. The cultural and psychological isolation of contractor workers was recognized a root cause of severe accidents in the recent years. That problem is common in chemical industry. The knowledge sharing has been assumed a good key to involve contractors and sub contractors in safety culture and contributing to injuries prevention. The selection of personal protective equipment PPE for the maintenance works has been taken as benchmark to demonstrate the adequateness of the proposed approach. To support plant operators, contractors and subcontractors in PPE discussion, a method has been developed. Its core is a knowledge-base, organized in an Ontology, as suitable for inferring decisions. By means of this tool all stakeholders have merged experience and information and find out the right PPE, to be provided, with adequate training and information package. PPE selection requires sound competencies about process and environmental hazards, including major accident, preventive and protective measures, maintenance activities. These pieces of knowledge previously fragmented among plant operators and contractors, have to be pooled, and used to find out the adequate PPE for a number of maintenance works. The PPE selection is per se important, but it is also a good chance to break the contractors' isolation and involve them in safety objectives. Thus by pooling experience and practical knowledge, the common understanding of safety issues has been strengthened.

  1. 48 CFR 970.5227-11 - Patent rights-management and operating contracts, for-profit contractor, non-technology transfer.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and operating contracts, for-profit contractor, non-technology transfer. 970.5227-11 Section 970.5227...-technology transfer. Insert the following clause in solicitations and contracts in accordance with 970.2703-1(b)(4): Patent Rights—Management and Operating Contracts, for-Profit Contractor, Non-Technology...

  2. An Operational Commander’s Guide to Contractors on the Battlefield

    DTIC Science & Technology

    2007-05-10

    Operational Law Handbook, Charlottesville, VA: 2005, 145. 12 R. R. Vernon, “Battlefield Contractors: Facing Tough Issues,” Public Contract Law Journal...Operations. Joint Pub 4-0. Washington, DC: 6 April 2000. Vernon, R. R. “Battlefield Contractors: Facing Tough Issues.” Public Contract Law Journal, Vol. 33 (Winter 2004): 404-421.

  3. Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed

    NASA Technical Reports Server (NTRS)

    Dunn, Steven C.; Schlank, John J.

    2010-01-01

    In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.

  4. Overseas Contingency Operations: Observations on the Use of Force Management Levels in Afghanistan, Iraq, and Syria

    DTIC Science & Technology

    2016-12-01

    relating to security force assistance activities and readiness of U.S. Special Operations Forces. • Increased Use of Contractors and Personnel on...Temporary Duty. DOD relies on contractors to support a wide range of military operations and free up uniformed personnel to directly support mission...needs. During operations in Afghanistan and Iraq contractor personnel played a critical role in supporting U.S. troops and sometimes exceeded the

  5. 30 CFR 45.4 - Independent contractor register.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Independent contractor register. 45.4 Section... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.4 Independent contractor register. (a) Each independent contractor shall provide the production-operator in writing the following information: (1) The independent...

  6. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970.4403 insert the following clause: Contractor Purchasing System (AUG 2009) (a) General. The Contractor...

  7. 48 CFR 970.1504-5 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...

  8. 48 CFR 970.1504-5 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...

  9. 48 CFR 970.1504-5 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...

  10. 48 CFR 970.1504-5 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...

  11. 48 CFR 970.1504-5 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Operations/Field Office Manager, or designee, requires the contractor to submit a self-assessment. (4) The contracting officer shall include the clause with its Alternate IV when the DOE Operations/Field Office Manager, or designee, permits the contractor to submit a self-assessment at the contractor's option. (b)(1...

  12. 49 CFR 199.245 - Contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.245 Section 199.245... Prevention Program § 199.245 Contractor employees. (a) With respect to those covered employees who are contractors or employed by a contractor, an operator may provide by contract that the alcohol testing...

  13. 48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., development, maintenance, and operation of Spanish-American installations and facilities. (b) The Contractor... this contract by reference. (c) The Contractor shall apply to the appropriate Spanish authorities for approval of status as a Direct Contractor in order to complete duty-free import of non-Spanish equipment...

  14. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.115 Section 199.115... § 199.115 Contractor employees. With respect to those employees who are contractors or employed by a contractor, an operator may provide by contract that the drug testing, education, and training required by...

  15. Simulation of tunneling construction methods of the Cisumdawu toll road

    NASA Astrophysics Data System (ADS)

    Abduh, Muhamad; Sukardi, Sapto Nugroho; Ola, Muhammad Rusdian La; Ariesty, Anita; Wirahadikusumah, Reini D.

    2017-11-01

    Simulation can be used as a tool for planning and analysis of a construction method. Using simulation technique, a contractor could design optimally resources associated with a construction method and compare to other methods based on several criteria, such as productivity, waste, and cost. This paper discusses the use of simulation using Norwegian Method of Tunneling (NMT) for a 472-meter tunneling work in the Cisumdawu Toll Road project. Primary and secondary data were collected to provide useful information for simulation as well as problems that may be faced by the contractor. The method was modelled using the CYCLONE and then simulated using the WebCYCLONE. The simulation could show the duration of the project from the duration model of each work tasks which based on literature review, machine productivity, and several assumptions. The results of simulation could also show the total cost of the project that was modeled based on journal construction & building unit cost and online websites of local and international suppliers. The analysis of the advantages and disadvantages of the method was conducted based on its, wastes, and cost. The simulation concluded the total cost of this operation is about Rp. 900,437,004,599 and the total duration of the tunneling operation is 653 days. The results of the simulation will be used for a recommendation to the contractor before the implementation of the already selected tunneling operation.

  16. Baseline Water Demand at Forward Operating Bases

    DTIC Science & Technology

    2013-09-15

    population, often equaling or exceeding the military population: • Brigade: 6000 soldiers • Battalion: 1000 soldiers • Company : 150 soldiers. ERDC/CERL TR...requirements for a company outpost (COP) of 120 personnel (PAX) in the format that the computer tool generates. This tool generates a basic sus...facilities world-wide through several large contractors. One contractor, Kellogg , Brown, and Root (KBR), used a minimum planning factor of 18.4

  17. 23 CFR 646.105 - Contractor's public liability and property damage insurance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... suffered by persons other than their own employees as a result of their operations in connection with... respecting their operations in performing work covered by their contract. (b) Where a contractor sublets a part of the work on any project to a subcontractor, the contractor shall be required to secure...

  18. 23 CFR 646.105 - Contractor's public liability and property damage insurance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... suffered by persons other than their own employees as a result of their operations in connection with... respecting their operations in performing work covered by their contract. (b) Where a contractor sublets a part of the work on any project to a subcontractor, the contractor shall be required to secure...

  19. 75 FR 63609 - Oil and Gas and Sulphur Operations in the Outer Continental Shelf-Safety and Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... safety of the offshore facility, including ensuring that all contractors and subcontractors have safety... safety analysis (task level); (3) Procedures to verify that contractors are conducting their activities in accordance with the operator's SEMS program and an evaluation to ensure that contractors have the...

  20. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 4 Accounts 1 2010-01-01 2010-01-01 false Government contractors. 83.19 Section 83.19 Accounts... contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel... of this part to be applied to such system. Any such contractor and any employee of such contractor...

  1. Alternative Fuels Data Center: Installing New E85 Equipment

    Science.gov Websites

    "milk run"). Hiring a Project Contractor In most cases, a fleet operator hires a project contractor to alter the onsite fueling system. This is often done through a bid process, especially if it is a fueling site operated by a government entity. The contractor is responsible for project oversight

  2. 48 CFR 970.5203-3 - Contractor's organization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor's organization... for Management and Operating Contracts 970.5203-3 Contractor's organization. As prescribed in 970.0371-9, insert the following clause: Contractor's Organization (DEC 2000) (a) Organization chart. As...

  3. 48 CFR 970.4401-2 - Review and approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing... contract; (2) The size, experience, ability, reliability, and organization of the management and operating contractor's purchasing function; (3) The internal controls, procedures, and organizational stature of the...

  4. California’s Shrinking Defense Contractors: Effects on Small Suppliers,

    DTIC Science & Technology

    1996-01-01

    They did not physically segregate any parts of their operations or set up a separate data management system to do business with prime contractors...of them out of business . * Small defense aerospace suppliers are not making cutting-edge products for commercial customers. Small defense aerospace...are considered critical to their primes’ supplier base are concerned. Most Firms Are Still in Business When we checked with a random sample of small

  5. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970... management system. The Contractor's approved purchasing system and methods shall include the requirements set... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contractor purchasing...

  6. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC... 923.102 Applicability to contractors. Many of the Department's major facilities are operated by contractors. Provisions regarding those contracts may be found at Part 970 of this chapter. At other locations...

  7. 76 FR 52133 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... 0750-AH28 Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security..., entitled ``Contractors Performing Private Security Functions in Areas of Combat Operations or Other... of DoD and other Governmental private security contractors. A clause to cover the interagency...

  8. Migrant and Seasonal Agricultural Worker Protection Act: Forestry contractors' model operating plan

    Treesearch

    Dan Bremer

    2007-01-01

    The Model Operating Plan for forestry contractors is a voluntary plan for compliance with the Migrant and Seasonal Agricultural Worker Protection Act (MSPA) of 1983, with amendments passed in 1996 and 1997. This plan is designed as a guide for forestry contractors who wish to comply with all federal, state, and local rules and regulations that govern their employer/...

  9. Apache sharply expands western Egypt acreage position

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-02-10

    Apache Corp. became Egypt`s second largest acreage holder with acquisition of Mobil Corp.`s nonoperating interests in three western desert exploration concessions covering a combined 7.7 million gross acres. Apache assumed a 50% contractor interest in the Repsol SA operated East Bahariya concession, a 33% contractor interest in the Repsol operated West Mediterranean Block 1 concession, and a 24% contractor interest in the Royal Dutch/Shell operated Northeast Abu Gharadig concession. The concessions carry a total drilling obligation of 11 wells the next 3 years.

  10. 77 FR 52107 - Air Traffic Data in the Possession of Government Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... Government Contractors AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice. SUMMARY: The... possession of government contractors providing operational services to the FAA. This notice specifies how and... contractors. SUPPLEMENTARY INFORMATION: A. Background On August 3, 2012, the Pilot's Bill of Rights, Public...

  11. Ground-based plasma contractor characterization

    NASA Technical Reports Server (NTRS)

    Patterson, Michael J.; Aadland, Randall S.

    1987-01-01

    Presented are recent NASA Lewis Research Center (LeRC) plasma contractor experimental results, as well as a description of the plasma contractor test facility. The operation of a 24 cm diameter plasma source with hollow cathode was investigated in the lighted-mode regime of electron current collection from 0.1 to 7.0 A. These results are compared to those obtained with a 12 cm plasma source. Full two-dimensional plasma potential profiles were constructed from emissive probe traces of the contractor plume. The experimentally measured dimensions of the plume sheaths were then compared to those theoretically predicted using a model of a spherical double sheath. Results are consistent for currents up to approximately 1.0 A. For currents above 1.0 A, substantial deviations from theory occur. These deviations are due to sheath asphericity, and possibly volume ionization in the double-sheath region.

  12. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  13. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a contractor...

  14. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  15. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  16. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  17. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  18. 32 CFR 1701.16 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Contractors. 1701.16 Section 1701.16 National... Under the Privacy Act of 1974 § 1701.16 Contractors. (a) Any approved contract for the operation of a... prescribed by the Federal Acquisition Regulations (FAR) at 48 CFR part 24, requiring the contractor to comply...

  19. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a contractor...

  20. 28 CFR 513.36 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Government contractors. 513.36 Section... contractors. (a) No Bureau component may contract for the operation of a record system by or on behalf of the... component shall have the responsibility to ensure that the contractor complies with the contract...

  1. Issues With Access to Acquisition Data and Information in the Department of Defense

    DTIC Science & Technology

    2017-01-01

    both procurement and operations), technical performance, contracts and contractor performance, and program decision memo- randa. These data are...the cost of weapon systems (both procurement and operations), techni- cal performance, contracts and contractor performance, and program decision...and tracking sensitive data, and 19 percent have no method at all (Trustwave, 2014, p. 4; Kerner, 2014). U.S. defense contractors face similar

  2. 48 CFR 970.0371 - Conduct of employees of DOE management and operating contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DOE management and operating contractors. 970.0371 Section 970.0371 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371 Conduct of employees of DOE...

  3. Development and validation of a strategic repositioning model for defense and aerospace contractors

    NASA Astrophysics Data System (ADS)

    Bers, John A.

    Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing, technology, or operations). (7) The absence of a difference in performance may be partly due to natural selection. Noncommercial markets tend to attract contractors with more deliberative, consultative, and process-oriented corporate cultures, while commercial markets tend to attract contractors with results-oriented, opportunistic cultures.

  4. Department of Defense Contractor and Troop Levels in Iraq and Afghanistan: 2007-2016

    DTIC Science & Technology

    2016-08-15

    Department of Defense Contractor and Troop Levels in Iraq and Afghanistan: 2007-2016 Heidi M. Peters, Coordinator Information Research......1 The Role of Contractors in Military Operations .............................................................................. 1

  5. Conoco's new approach to drill site construction in difficult, remote, swamp and jungle terrain Irian Jaya, Indonesia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roodriguez, F.H.

    1984-02-01

    In October 1982, Conoco Irian Jaya as operator: and partners: Pertamina, Inpex Bintuni Limited, and Moeco Irian Jaya Company, mobilized construction equipment from Singapore to the KBS ''A'' contract area in Irian Jaya, Indonesia for the purpose of constructing a base camp and drill three exploratory sites. What made this construction effort different from others previously used in Irian Jaya; was that it incorporated several new and unique features, namely: a turnkey approach to construction; that is Conoco providing complete set of specifications and conditions with contractor assuming risks for a lump sum payment; special equipment designed by contractor formore » Irian Jaya operations; an incentive to co pensate or penalize contractor for helicopter hours flown below or above a predetermined number; structural steel pile platform designs for two swamp locations (Ayot and Aum), as opposed to the more conventional corduroy timber log-plank arrangement; and drilling rig pads designed for specific heli-rig with limited extra space. All work was successfully completed within the time frame stipulated in the contract, that is five months from the time the contractor was notified to begin mobilization of equipment, materials and personnel.« less

  6. 48 CFR 970.0371 - Conduct of employees of DOE management and operating contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Conduct of employees of DOE management and operating contractors. 970.0371 Section 970.0371 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS...

  7. 48 CFR 970.0371-7 - Outside employment of contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business.... Employees of a management and operating contractor are entitled to the same rights and privileges with... full or part-time basis under a DOE management and operating contract may engage in employment outside...

  8. Contractors are cautiously optimistic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stremel, K.

    1984-10-01

    Anticipating stable crew counts and marginal increases in operator exploration budgets, geophysical contractors are cautiously optimistic about continued industry growth. Most companies are operating on lean profits, and more business consolidations are expected as the market gradually rebounds. Prospects for an upturn in geophysical operations by oil companies are discussed.

  9. 77 FR 35883 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... 0750-AH28 Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security... Contractors (DoDI 3020.50) was revised on August 1, 2011, and the final rule to implement section 862 of the NDAA for FY 2008, as amended, 32 CFR part 159, Private Security Contractors Operating in Contingency...

  10. Battlefield Contractors: Operational Risk and System Support Contractors

    DTIC Science & Technology

    2010-10-27

    incentive for the use of contractors is the proven cost savings when compared to similarly trained active duty military forces. The Office of...no military or government civilian is trained to do. The reality is that “modern military operations now depend heavily on high-tech weapons systems...squadrons that rely exclusively on contracted line maintenance, with no military personnel trained to support the aircraft. Defense supplemental funds

  11. Institutional environmental impact statement, Michoud Assembly Facility, New Orleans, Louisiana

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A description and analysis of Michoud Assembly Facility as an operational base for both NASA and NASA-related programs and various government tenant-agencies and their contractors is given. Tenant-agencies are governmental agencies or governmental agency contractors which are not involved in a NASA program, but utilize office or manufacturing space at the Michoud Assembly Facility. The statements represent the full description of the likely environmental effects of the facility and are used in the process of making program and project decisions.

  12. Outsourcing strategy and tendering methodology for the operation and maintenance of CERN’s cryogenic facilities

    NASA Astrophysics Data System (ADS)

    Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Ferrand, F.; Pezzetti, M.; Pirotte, O.

    2017-12-01

    CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.

  13. 48 CFR 970.0407 - Contractor records retention.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor records retention. 970.0407 Section 970.0407 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0407 Contractor...

  14. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burdick, A.

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVACmore » companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational profile of an integrated whole house performance contracting company and identify the most significant challenges facing a traditional HVAC contractor looking to transition to a whole house performance contractor. To facilitate the discussion, IBACOS divided the business operations profile of a typical integrated whole house performance contracting company (one that performs both HVAC and shell repair/upgrade work) into seven Operational Areas with more detailed Business Functions and Work Activities falling under each high-level Operational Area. The expert panel was asked to review the operational profile or 'map' of the Business Functions. The specific Work Activities within the Business Functions identified as potential transition barriers were rated by the group relative to the value in IBACOS creating guidance ensuring a successful transition and the relative difficulty in executing.« less

  15. 48 CFR 945.607-2 - Recovering precious metals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 945.607-2 Recovering precious metals. (b) Contractors generating contractor inventory containing precious metals shall... silver should be reported to the precious metals pool. The Oak Ridge Operations Office is responsible for...

  16. 48 CFR 970.0371-4 - Gratuities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371-4 Gratuities. Employees of a management and operating contractor shall not, under... contractor is doing business, or proposing to do business, in accomplishing the work under the contract...

  17. Motivation for a High Explosive Testing Program in South Africa

    DTIC Science & Technology

    2015-12-04

    following): Contractor Performance Evaluation Foreign Government Information Administrative or Operational Use Specific Authority ~ Proprietary lnformati...Software Document~tion Administrative or Operational Use B Foreign Governmen Information 0 D. Distribution authorized to the Department of Defense...and U.S. DoD Contractors only (check the following): 0 § Foreign Government Information Critical Technology Administrative or Operational Use B

  18. 26 CFR 31.3121(d)-1 - Who are employees.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., retailers, contractors, or operators of hotels, restaurants, or other similar establishments for merchandise..., retailers, contractors, or operators of hotels, restaurants, or other similar establishments for merchandise... solicits such orders from retail stores and restaurants. C is not within this occupational group. (4)(i...

  19. Stream protection with small cable yarding systems

    Treesearch

    Penn A. Peters; Chris B. LeDoux

    1984-01-01

    Small cable yarder systems that can be purchased and operated by independent logging contractors have less potential negative impact on water quality than ground-based systems operating on steep terrain because they do not require such an intense road system. Stream protection costs were estimated at $3.78 per lineal foot of stream when a typical small yarder (Koller K...

  20. Contractor evaluations in the contractor selection process.

    DOT National Transportation Integrated Search

    2014-04-01

    The current contractor evaluation system in use within the Kentucky Transportation Cabinet is based on the contractor evaluation system developed as part of SPR 212-00 "Quality Based Prequalification of Contractors." This system relies on average per...

  1. 48 CFR 225.7401 - Contracts requiring performance or delivery in a foreign country.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... operational area, follow the procedures at PGI 225.7401(a). (b) For work performed in Germany, eligibility for logistics support or base privileges of contractor employees is governed by U.S.-German bilateral agreements...

  2. 48 CFR 225.7401 - Contracts requiring performance or delivery in a foreign country.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... operational area, follow the procedures at PGI 225.7401(a). (b) For work performed in Germany, eligibility for logistics support or base privileges of contractor employees is governed by U.S.-German bilateral agreements...

  3. 48 CFR 225.7401 - Contracts requiring performance or delivery in a foreign country.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... operational area, follow the procedures at PGI 225.7401(a). (b) For work performed in Germany, eligibility for logistics support or base privileges of contractor employees is governed by U.S.-German bilateral agreements...

  4. 48 CFR 225.7401 - Contracts requiring performance or delivery in a foreign country.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... operational area, follow the procedures at PGI 225.7401(a). (b) For work performed in Germany, eligibility for logistics support or base privileges of contractor employees is governed by U.S.-German bilateral agreements...

  5. 48 CFR 225.7401 - Contracts requiring performance or delivery in a foreign country.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... operational area, follow the procedures at PGI 225.7401(a). (b) For work performed in Germany, eligibility for logistics support or base privileges of contractor employees is governed by U.S.-German bilateral agreements...

  6. Efforts to Prevent Sexual Assault/Harassment Involving DOD Contractors During Contingency Operations

    DTIC Science & Technology

    2010-04-16

    36 FAR Subpart 9.406-5, “ Debarment ,” October 1995, provides the Government with the option of imposing debarment or suspension as... sanctions against a contractor to protect the Government’s interest when the agent of the contractor, such as an employee, engages in fraudulent, criminal

  7. 48 CFR 52.225-26 - Contractors Performing Private Security Functions Outside the United States.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., helicopters, and other military vehicles operated by Contractors performing private security functions; and... Private Security Functions Outside the United States. 52.225-26 Section 52.225-26 Federal Acquisition... CONTRACT CLAUSES Text of Provisions and Clauses 52.225-26 Contractors Performing Private Security Functions...

  8. 48 CFR 52.225-26 - Contractors Performing Private Security Functions Outside the United States.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., helicopters, and other military vehicles operated by Contractors performing private security functions; and... Private Security Functions Outside the United States. 52.225-26 Section 52.225-26 Federal Acquisition... CONTRACT CLAUSES Text of Provisions and Clauses 52.225-26 Contractors Performing Private Security Functions...

  9. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 4 Accounts 1 2011-01-01 2011-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...

  10. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 4 Accounts 1 2013-01-01 2013-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...

  11. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 4 Accounts 1 2012-01-01 2012-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...

  12. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 4 Accounts 1 2014-01-01 2013-01-01 true Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...

  13. U.S. Northern Command > About USNORTHCOM > Doing Business with USNORTHCOM

    Science.gov Websites

    Central Contractor Registration (CCR) http://www.ccr.gov Vendors should register in the U.S. federal government's Central Contractor Registration (CCR). A Data Universal Numbering System (DUNS®) number, provided planning and conducting contracting and contractor management functions in support of joint operations

  14. Contractor and government - Teamwork and commitment

    NASA Technical Reports Server (NTRS)

    Griffin, G. D.

    1985-01-01

    Procedures being implemented at NASA to improve cooperation with contractors and increase productivity are reviewed from the NASA point of view. The goals of the U.S. space program for the coming 25 years are listed, and the importance of the commercial utilization of space in these plans is stressed. Consideration is given to the ongoing American Productivity Center White-Collar Productivity-Improvement Project, the implementation of the recommendations of the 1984 NASA/Contractor Conferences in present and future contracts, and the use of incentive contracts to create situations in which both NASA and the contractor benefit from increased productivity. Future plans call for increased industry responsibility in managing and operating the STS; steamlining of Shuttle operations; advanced design-to-cost procedures, increased commonality, better NASA-contractor communications, and more use of CAD/CAM and robotics for the Space Station; and accommodation of greatly expanded private investment and exploitation of space.

  15. Data quality objectives for TWRS privatization phase 1: confirm tank T is an appropriate feed source for low-activity waste feed batch X

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NGUYEN, D.M.

    1999-06-01

    The US. Department of Energy, Richland Operations Office (DOE-RL) has initiated Phase 1 of a two-phase privatization strategy for treatment and immobilization of low-activity waste (LAW) currently being managed by the Hanford Tank Waste Remediation System (TWRS) Project. In this strategy, DOE will purchase services from a contractor-owned and operated facility under a fixed price. The Phase 1 TWRS privatization contract requires that the Project Hanford Management Contract (PHMC) contractors, on behalf of DOE, deliver LAW feed in specified quantities and composition to the Privatization Contractor in a timely manner (DOE-RL 1996). Additional requirements are imposed by the interface controlmore » document (ICD-19) for LAW feed (PHMC 1997). In response to these requirements, the Tank Waste Remediation System Operation and Utilization Plan (TWRSO and UP) (Kirkbride et al. 1997) was prepared by the PHMC. The TWRSO and UP, as updated by the Readiness-To-Proceed deliverable (Payne et al. 1998), establishes the baseline operating scenario for the delivery of LAW feed to the Privatization Contractor. The scenario specifies tanks from which LAW will be provided for each feed batch, the operational activities needed to prepare and deliver each batch, and the timing of these activities. The operating scenario was developed based on current knowledge of waste composition and chemistry, waste transfer methods, and operating constraints, such as tank farm logistics and availability of tank space. A project master baseline schedule (PMBS) has been developed to implement the operating scenario. The PMBS also includes activities aimed at reducing programmatic risks. One of the activities, ''Confirm Plans and Requirements,'' was identified to verify the basis used to develop the scenario. Additional data on waste quantity, physical and chemical characteristics, and transfer properties will be needed to support this activity. This document describes the data quality objective (DQO) process undertaken to assme appropriate data will be collected to support the activity, ''Confirm Tank Plans and Requirements.'' The DQO process was implemented in accordance with the TWRS DQO process (Banning 1997) with some modifications to accommodate project or tank-specific requirements and constraints.« less

  16. Feasibility Analysis and Prototyping of a Fast Autonomous Recon system

    DTIC Science & Technology

    2017-06-01

    Test and Evaluation Interim Contractor Support System Assessment OPERATIONAL USE AND SYSTEM SUPPORT System Operation in the User Environment...Sustaining Maintenance and Logistics Support Operational Testing System Modifications for Improvement Contractor Support System Assessment...helicopter but has the added benefit of high -speed flight similar to a fixed-wing aircraft. Figure 1 shows the two different flight modes of the V-22

  17. 75 FR 2926 - Pipeline Safety: Reporting Drug and Alcohol Test Results for Contractors and Multiple Operator...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-19

    ... Management Information System (DAMIS) to allow the reporting of contractor data without duplication and will begin collecting annual drug and alcohol testing data for contractor employees with Management... regulated by 49 CFR Parts 192, 193, and 195. In a final rule titled ``Management Information System (MIS...

  18. Alternative Fuels Data Center: Installing B20 Equipment

    Science.gov Websites

    operations to share the fueling site with you. Secure Permits, Adhere to State Requirements The contractor is storage tanks. The contractor will register storage tanks with the state environmental agency, which must the contractor and client to ensure the completed project meets expectations. Maps & Data U.S

  19. Contractor Logistics Support in the U.S. Air Force

    DTIC Science & Technology

    2009-01-01

    limits), or it can engage in a mix of the two approaches.2 This monograph addresses CLS, which is defined as contractor sustainment of a weapon system...organic facilities; it can pay contractors to do the work (subject to some congressional limits); or it can apply a mix of the two approaches.2 Organic...levels are largely stable and represent a mix of services, including contractor operated facilities and instal- Figure 3.1 Air Force CSS for Weapon

  20. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing... contractor, an operator may provide by contract that the drug testing, education, and training required by...

  1. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing... contractor, an operator may provide by contract that the drug testing, education, and training required by...

  2. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing... contractor, an operator may provide by contract that the drug testing, education, and training required by...

  3. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Drug Testing... contractor, an operator may provide by contract that the drug testing, education, and training required by...

  4. 78 FR 63455 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ..., Building 23, Columbus, OH 43213-1152. Defense Manpower Data Center, 400 Gigling Road, Seaside CA 93955... web-based system providing a repository of military, Government civilian and contractor personnel and..., tracking, reporting, evaluating program effectiveness and conducting research. The Total Operational...

  5. 48 CFR 915.305 - Proposal evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Personnel from DOE, other Government agencies, consultants, and contractors, including those who manage or... contractors who operate or manage Government-owned facilities, are to be used as evaluators or advisors...

  6. 48 CFR 915.305 - Proposal evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Personnel from DOE, other Government agencies, consultants, and contractors, including those who manage or... contractors who operate or manage Government-owned facilities, are to be used as evaluators or advisors...

  7. 48 CFR 915.305 - Proposal evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Personnel from DOE, other Government agencies, consultants, and contractors, including those who manage or... contractors who operate or manage Government-owned facilities, are to be used as evaluators or advisors...

  8. 48 CFR 915.305 - Proposal evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Personnel from DOE, other Government agencies, consultants, and contractors, including those who manage or... contractors who operate or manage Government-owned facilities, are to be used as evaluators or advisors...

  9. Skylab checkout operations. [from multiple docking adapter contractor viewpoint

    NASA Technical Reports Server (NTRS)

    Timmons, K. P.

    1973-01-01

    The Skylab Program at Kennedy Space Center presented many opportunities for interesting and profound test and checkout experience. It also offered a compilation of challenges and promises for the Center and for the contractors responsible for the various modules making up Skylab. It is very probable that the various contractors had common experiences during the module and combined systems tests, but this paper will discuss those experiences from the viewpoint of the Multiple Docking Adapter contractor. The experience will consider personnel, procedures, and hardware.

  10. Lessons Learned from Outsourcing the Pearl Harbor MK-48 Intermediate Maintenance Activity

    DTIC Science & Technology

    2008-03-01

    transfer of ownership of assets. However, outsourcing is not simply a procurement decision. All organizations procure elements of their operations...systems, commercialization, and franchising (Office of Management and Budget, 2004). Strengths of Outsourcing Outsourcing is more efficient than...operating the IMA with organic resources vs . the cost of a comparable service provided by a contractor. Activity-based costing would also help managers

  11. Task Force On Contractor Logistics in Support of Contingency Operations

    DTIC Science & Technology

    2014-06-01

    existing industrial base providing support services to deployed military forces should be integrated into all contingency war games and exercises...implementation of OCS in active operations has been a constant game of catch up for more than a decade. Poor contract administration, inconsistent...military forces should be integrated into all contingency war games and exercises. Equally important is including representatives from the agencies

  12. Defense Management: Actions Needed to Improve Management of Air Force’s Food Transformation Initiative

    DTIC Science & Technology

    2011-07-01

    nonappropriated fund food and beverage operations, such as clubs and snack bars, accepted jobs with the new contractor, but their job security remains uncertain...operate the nonappropriated fund food and beverage operations, such as clubs and bowling center snack bars, because many of these facilities were...center and golf course snack bars and officers’ and enlisted members’ clubs, to Aramark in a commission-based contract.11 Table 1 lists the pilot

  13. Means of Effective Security Sector Reform: A Comparison of US Military and Contractor Programs

    DTIC Science & Technology

    2011-05-19

    the US Army took over 400 suspension / debarment actions in fiscal year 2010.65 GAO report 11-419T, Foreign Operations: Key Issues for Congressional...Contracting, Ensuring Contractor Accountability: Past Performance and Suspension & Debartment, Testimony, (Washington, D.C.: Commission on Wartime...64 Ibid., 8. 65 Commission on Wartime Contracting, Ensuring Contractor Accountability: Past Performance and Suspension

  14. Prestigious Council to Advise National Renewable Energy Lab

    Science.gov Websites

    laboratory by offering independent advice and counsel to the NREL operating contractor and NREL Director five years. The partnership officially became NREL's contractor today, following 21 years of management

  15. Department of the Air Force Information Technology Program FY 95 President’s Budget

    DTIC Science & Technology

    1994-03-01

    2095 2200 552 900 1032 Description: Contractor hardware maintenan support, systems analyst support software development and maintenance, and off -the...hardware maintenance support, systems analyst support, operations support, configuration management, test support, and off -the-shelf software license...2419 2505 2594 Description: Contractor hardware maintenance support, systems analyst support, operations support, and off -the-shelf software license

  16. Training Issues Associated with COTS-based Information Intensive Systems.

    ERIC Educational Resources Information Center

    Farr, John V.; Verma, Dinesh

    2002-01-01

    A literature review and survey responses from 194 information technology and aerospace contractors identified methods and outcomes of training delivery. Results were used to develop a framework for evaluating and selecting commercial off-the-shelf systems (COTS) for operations and maintenance training. (Contains 11 references.) (SK)

  17. Data quality objectives for TWRS privatization phase 1: confirm tank T is an appropriate feed source for high-level waste feed batch X

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NGUYEN, D.M.

    1999-06-01

    The U.S. Department of Energy-Richland Operations Office (DOE-RL) has initiated Phase 1 of a two-phase privatization strategy for treatment and immobilization of high-level waste (HLW) that is currently managed by the Hanford Tank Waste Remediation System (TWRS) Project. In this strategy, DOE will purchase services from a contractor-owned and operated facility under a fixed price. The Phase 1 TWRS privatization contract requires that the Project Hanford Management Contract (PHMC) contractors, on behalf of DOE, deliver HLW feed in specified quantities and composition to the Privatization Contractor in a timely manner (DOE-RL 1996). Additional requirements are imposed by the interface controlmore » document (ICD) for HLW feed (PHMC 1997). In response to these requirements, the Tank Waste Remediation System Operation and Utilization Plan (TWRSO and UP) (Kirkbride et al. 1997) was prepared by the PHMC. The TWRSO and UP, as updated by the Readiness-To-Proceed (RTP) deliverable (Payne et al. 1998), establishes the baseline operating scenario for the delivery of HLW feed to the Privatization Contractor. The scenario specifies tanks from which HLW will be provided for each feed batch, the operational activities needed to prepare and deliver each batch, and the timing of these activities. The operating scenario was developed based on current knowledge of waste composition and chemistry, waste transfer methods, and operating constraints such as tank farm logistics and availability of tank space. A project master baseline schedule (PMBS) has been developed to implement the operating scenario. The PMBS also includes activities aimed at reducing programmatic risks. One of the activities, ''Confirm Tank TI is Acceptable for Feed,'' was identified to verify the basis used to develop the scenario Additional data on waste quantity, physical and chemical characteristics, and transfer properties will be needed to support this activity. This document describes the data quality objective (DQO) process undertaken to assure appropriate data will be collected to support the activity, ''Confirm Tank T is Acceptable for HLW Feed.'' The DQO process was implemented in accordance with the TWRS DQO process (Banning 1997) with some modifications to accommodate project or tank-specific requirements and constraints.« less

  18. Staffing for Cyberspace Operations: Summary of Analysis

    DTIC Science & Technology

    2016-08-01

    appropriate total force mix, defined as the choice between military, civilian, and contractor performance of DoD activities, is a key component in this...designated for civilian performance if the requirement is inherently governmental or subject to least-cost government civilian or contractor performance if...activities open to the least costly performance type (government civilian or contractor ). To understand the CMF mission requirements, we studied existing

  19. Case Study of European Union Antipiracy Operation Naval Force Somalia: Successes, Failures and Lessons Learned for the Hellenic Navy

    DTIC Science & Technology

    2012-09-01

    and food supplies, Waste and laundry , Accommodation, Communication, Medical services and Fuel and lubricants. That was something that caused a lot of...for reducing this burden, to Washington headquarters Services , Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway...53 5. Establish a Data Base with the Contractors and the Prices of the Goods and Services

  20. Proceedings of the Department of Energy ALARA Workshop

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dionne, B.J.; Baum, J.W.

    1992-01-01

    The report contains summaries of papers, discussions, and operational exercises presented at the first Department of Energy ALARA Workshop held at Brookhaven National Laboratory, Upton, New York on April 21--22, 1992. The purpose of this workshop was to provide a forum for, and enhance communication among, ALARA personnel, as well as to inform DOE's field office and contractor personnel about the Office of Health's programs and expectations from the entire DOE complex efforts in the ALARA area.The two-day workshop consisted of one day dedicated to presentations on implementing various elements of a formal ALARA program at the DOE contractors' facilities,more » regulatory aspects of ALARA programs, and DOE Headquarters' ALARA expectations/initiatives. The second day was devoted to detailed discussions on ALARA improvements and problems, and operational exercises on cost-benefit analyses and on ALARA job/experiment reviews. At this workshop, 70 health physicists and radiation safety engineers from 5 DOE Headquarter Offices, 7 DOE operations/area offices, and 27 contractor facilities exchanged information, which is expected to stimulate further improvement in the DOE contractors' ALARA programs. Individual papers are indexed separately.« less

  1. 48 CFR 970.1504-1-5 - General considerations and techniques for determining fixed fees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) The Department's fee policy recognizes that fee is remuneration to contractors for the entrepreneurial... and amounts for DOE management and operating contracts is inappropriate considering the limited level.... Instead of being solely cost-based, the desirable approach calls for a structure that allows evaluation of...

  2. 48 CFR 970.1504-1-5 - General considerations and techniques for determining fixed fees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) The Department's fee policy recognizes that fee is remuneration to contractors for the entrepreneurial... and amounts for DOE management and operating contracts is inappropriate considering the limited level.... Instead of being solely cost-based, the desirable approach calls for a structure that allows evaluation of...

  3. 44 CFR 351.24 - The Department of Energy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false The Department of Energy. 351... Assignments § 351.24 The Department of Energy. (a) Determine the appropriate planning bases for the Department of Energy (DOE) owned and contractor operated nuclear facilities (e.g., research and weapon...

  4. 44 CFR 351.24 - The Department of Energy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false The Department of Energy. 351... Assignments § 351.24 The Department of Energy. (a) Determine the appropriate planning bases for the Department of Energy (DOE) owned and contractor operated nuclear facilities (e.g., research and weapon...

  5. 44 CFR 351.24 - The Department of Energy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false The Department of Energy. 351... Assignments § 351.24 The Department of Energy. (a) Determine the appropriate planning bases for the Department of Energy (DOE) owned and contractor operated nuclear facilities (e.g., research and weapon...

  6. 44 CFR 351.24 - The Department of Energy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false The Department of Energy. 351... Assignments § 351.24 The Department of Energy. (a) Determine the appropriate planning bases for the Department of Energy (DOE) owned and contractor operated nuclear facilities (e.g., research and weapon...

  7. 44 CFR 351.24 - The Department of Energy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true The Department of Energy. 351... Assignments § 351.24 The Department of Energy. (a) Determine the appropriate planning bases for the Department of Energy (DOE) owned and contractor operated nuclear facilities (e.g., research and weapon...

  8. Fuel cell technology program

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The results of a solid polymer electrolyte fuel cell development program are summarized. A base line design was defined, and materials and components of the base line configuration were fabricated and tested. Concepts representing base line capability extensions in the areas of life, power, specific weight and volume, versatility of operation, field maintenance, and thermal control were identified and evaluated. Liaison and coordination with space shuttle contractors resulted in the exchange of engineering data.

  9. Toxic substances registry system: Index of material safety data sheets

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The Jul. 1992 Revision of the KSC Toxic Substances Registry System (TSRS) Index of Material Safety Data Sheets (MSDS's) is presented. The listed MSDS's reflect product inventories and associated MSDS's which were submitted to the Toxic Substance Registry Data Base maintained by the Base Operations Contractors of the Biomedical Operations and Research Office of KSC. The purpose of the index is to provide a means of accessing information on the hazards associated with the toxic and otherwise hazardous chemicals stored and used at KSC. Indices are provided for manufacturers, trademarks, and stock numbers.

  10. 48 CFR 970.0309 - Whistleblower Protection of Contractor Employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Whistleblower Protection of Contractor Employees. 970.0309 Section 970.0309 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business...

  11. 48 CFR 970.0309 - Whistleblower Protection of Contractor Employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Whistleblower Protection of Contractor Employees. 970.0309 Section 970.0309 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business...

  12. 20 CFR 670.985 - What happens if a center operator, screening and admissions contractor or other service provider...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... LABOR THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Administrative and Management..., including a screening and admissions contractor; (2) Changing the management staff of a center; (3) Changing...

  13. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  14. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  15. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  16. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  17. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.116 Subcontracting and contractor responsibilities. (a) Contracts for projects shall specify the minimum percentage of work that a... total original contract price excluding any identified specialty items. Specialty items may be performed...

  18. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  19. 48 CFR 652.228-70 - Defense Base Act-Covered Contractor Employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Defense Base Act-Covered....228-70 Defense Base Act—Covered Contractor Employees. As prescribed in 628.309-70(a), insert the following provision: Defense Base Act—Covered Contractor Employees (JUN 2006) (a) Bidders/offerors shall...

  20. 48 CFR 652.228-70 - Defense Base Act-Covered Contractor Employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Defense Base Act-Covered....228-70 Defense Base Act—Covered Contractor Employees. As prescribed in 628.309-70(a), insert the following provision: Defense Base Act—Covered Contractor Employees (JUN 2006) (a) Bidders/offerors shall...

  1. Office of Economic Adjustment | U.S. Department of Defense

    Science.gov Websites

    Reuse Compatible Use Defense Contractor Transitions Federal Assistance Coordination Mission Change contractor or manufacturer is making cuts or closing. Explore BRAC Icon Base Realignment and Closure A contact information. What We Do Base Closure Base Realignment Base Reuse Compatible Use Defense Contractor

  2. Debarment and suspension. [of contractors

    NASA Technical Reports Server (NTRS)

    Whelan, Thomas J.

    1987-01-01

    The changing Government attitude toward contractor debarment and suspension is examined, with emphasis on the fact that the Government is more alert to fraud, waste, and abuse. Consideration is given to causes of debarment or suspension, procedures and due process hearings, settlement agreements, compliance programs, and recent related legislation. It is concluded that the change in the Government contracting environment in recent years should be sufficient incentive for contractors to monitor their operations more closely.

  3. The role of NASA for aerospace information

    NASA Technical Reports Server (NTRS)

    Chandler, G. P., Jr.

    1980-01-01

    The NASA Scientific and Technical Information Program operations are performed by two contractor operated facilities. The NASA STI Facility, located near Baltimore, Maryland, employs about 210 people who process report literature, operate the computer complex, and provide support for software maintenance and developments. A second contractor, the Technical Information Services of the American Institute of Aeronautics and Astronautics, employs approximately 80 people in New York City and processes the open literature such as journals, magazines, and books. Features of these programs include online access via RECON, announcement services, and international document exchange.

  4. NASA operations: An agency wide approach to reduce cost

    NASA Technical Reports Server (NTRS)

    Squibb, Gael F.

    1996-01-01

    The NASA Space Operations Management Office (SOMO) is presented. The SOMO concept is based on continuing the distributed participation of the various NASA field centers and agencies, while employing consolidated management through a single lead center. The aim is to determine the duplicity and the overlap between the different agencies that independently developed their own operations management approaches in order to enable more cost effective mission operations by providing common services to the NASA programs. The space operations management will be performed in a distributed manner with a greater degree of contractor involvement than in the past. The changes, approaches and anticipated benefits of this approach to operations are discussed.

  5. 48 CFR 952.227-11 - Patent rights-retention by the contractor (short form).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... process or method; or to operate, in the case of a machine or system; and, in each case, under such... 60 days after learning of the failure of the Contractor to disclose or elect within the specified...

  6. Effective Teamwork: The EVA NBL Experience

    NASA Technical Reports Server (NTRS)

    Crocker, Lori

    2007-01-01

    This viewgraph presentation reviews the experience of improving the operation of the ExtraVehiclar Activity (EVA) Neutral Buoyancy Laboratory as a team of NASA employees and contractors. It reviews specific recommendations to use in turning a struggling organization around as a NASA/contractor team

  7. 48 CFR 952.227-11 - Patent rights-retention by the contractor (short form).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... process or method; or to operate, in the case of a machine or system; and, in each case, under such... 60 days after learning of the failure of the Contractor to disclose or elect within the specified...

  8. 48 CFR 952.227-11 - Patent rights-retention by the contractor (short form).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... process or method; or to operate, in the case of a machine or system; and, in each case, under such... 60 days after learning of the failure of the Contractor to disclose or elect within the specified...

  9. 48 CFR 952.227-11 - Patent rights-retention by the contractor (short form).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... process or method; or to operate, in the case of a machine or system; and, in each case, under such... 60 days after learning of the failure of the Contractor to disclose or elect within the specified...

  10. Proceedings of the Department of Energy ALARA Workshop

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dionne, B.J.; Baum, J.W.

    1992-12-31

    The report contains summaries of papers, discussions, and operational exercises presented at the first Department of Energy ALARA Workshop held at Brookhaven National Laboratory, Upton, New York on April 21--22, 1992. The purpose of this workshop was to provide a forum for, and enhance communication among, ALARA personnel, as well as to inform DOE`s field office and contractor personnel about the Office of Health`s programs and expectations from the entire DOE complex efforts in the ALARA area.The two-day workshop consisted of one day dedicated to presentations on implementing various elements of a formal ALARA program at the DOE contractors` facilities,more » regulatory aspects of ALARA programs, and DOE Headquarters` ALARA expectations/initiatives. The second day was devoted to detailed discussions on ALARA improvements and problems, and operational exercises on cost-benefit analyses and on ALARA job/experiment reviews. At this workshop, 70 health physicists and radiation safety engineers from 5 DOE Headquarter Offices, 7 DOE operations/area offices, and 27 contractor facilities exchanged information, which is expected to stimulate further improvement in the DOE contractors` ALARA programs. Individual papers are indexed separately.« less

  11. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impactmore » to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.« less

  12. Toxic substances registry system: Index of material safety data sheets

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The Material Safety Data Sheets (MSDS's) listed in this index reflect product inventories and associated MSDS's which were submitted to the Toxic Substances Registry database maintained by the Base Operations Contractor at the Kennedy Space Center. The purpose of this index is to provide KSC government, contractor, and tenant organizations a means to access information on the hazards associated with these chemicals. The Toxic Substance Registry Service (TSRS) was established to manage information dealing with the storage and use of toxic and otherwise hazardous materials at KSC. As a part of this service, the BOC Environmental Health Services maintains a central repository of MSDS's which were provided to TSRS. The data on the TSRS are obtained from NASA, contractor, and tenant organizations who use or store hazardous materials at KSC. It is the responsibility of these organizations to conduct inventories, obtain MSDS's, distribute Hazard Communication information to their employees, and otherwise implement compliance with appropriate Federal, State, and NASA Hazard Communication and Worker Right-to-Know regulations and policies.

  13. 48 CFR 970.0371-7 - Outside employment of contractor employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Outside employment of contractor employees. 970.0371-7 Section 970.0371-7 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business...

  14. TRICARE Managed Care Support Contractor Program Integrity Units Met Contract Requirements

    DTIC Science & Technology

    2012-12-05

    these contractors because they represented 52 percent of purchased care claims paid in 20 ll for TRICARE beneficiaries. We did not review the dental ...5 (!ru-L..!J(It~ t’J Alice F. Carey Assistant Inspector General Readiness, Operations, and Support

  15. RADON REDUCTION TECHNIQUES FOR DETACHED HOUSES, TECHNICAL GUIDANCE (SECOND EDITION)

    EPA Science Inventory

    This document is intended for use by State officials, radon mitigation contractors, building contractors, concerned homeowners, and other persons as an aid in the selection, design, and operation of radon reduction measurements for houses. It is the second edition of EPA's techn...

  16. Contractors on Deployed Military Operations: United Kingdom Policy and Doctrine

    DTIC Science & Technology

    2005-09-01

    contractor’s workforce than military personnel, and contractors cannot be disciplined for violations of the Uniform Code of Military Justice.101 Moreover...objectives are met.151 The MoD’s “Defence Agencies” currently employ 60 percent of MoD’s civilian workforce and 11 percent of total uniformed personnel...operations by staff drawn from the contractor’s workforce who are reservist members of the Armed Forces.”177 With these initiatives, MoD assumes it has

  17. Selection of infectious medical waste disposal firms by using the analytic hierarchy process and sensitivity analysis.

    PubMed

    Hsu, Pi-Fang; Wu, Cheng-Ru; Li, Ya-Ting

    2008-01-01

    While Taiwanese hospitals dispose of large amounts of medical waste to ensure sanitation and personal hygiene, doing so inefficiently creates potential environmental hazards and increases operational expenses. However, hospitals lack objective criteria to select the most appropriate waste disposal firm and evaluate its performance, instead relying on their own subjective judgment and previous experiences. Therefore, this work presents an analytic hierarchy process (AHP) method to objectively select medical waste disposal firms based on the results of interviews with experts in the field, thus reducing overhead costs and enhancing medical waste management. An appropriate weight criterion based on AHP is derived to assess the effectiveness of medical waste disposal firms. The proposed AHP-based method offers a more efficient and precise means of selecting medical waste firms than subjective assessment methods do, thus reducing the potential risks for hospitals. Analysis results indicate that the medical sector selects the most appropriate infectious medical waste disposal firm based on the following rank: matching degree, contractor's qualifications, contractor's service capability, contractor's equipment and economic factors. By providing hospitals with an effective means of evaluating medical waste disposal firms, the proposed AHP method can reduce overhead costs and enable medical waste management to understand the market demand in the health sector. Moreover, performed through use of Expert Choice software, sensitivity analysis can survey the criterion weight of the degree of influence with an alternative hierarchy.

  18. Managing the Private Spies: Use of Commercial Augmentation for Intelligence Operations

    DTIC Science & Technology

    2006-06-01

    even has a Field Manual devoted to contractor administration which brings out many of the same points (FM 3-100.26, “Contractors on the Battlefi eld...Printing Offi ce), 2001, 53. 38 Mahlon Apgar and John Keane, “New Business with the New Military,” Harvard Business Review, (September 2004), 45. 12 are... manual for Contractors on the Battlefi eld acknowledges that “there is no specifi cally identifi ed force structure nor detailed policy on how to

  19. The Department of Defense’s Use of Private Security Contractors in Iraq and Afghanistan: Background, Analysis, and Options for Congress

    DTIC Science & Technology

    2010-06-22

    Congress has generally accepted the concept of using unarmed contractors to carry out support functions in military operations, such as providing food and...countries where stability generally is not an issue. 3 According to one report, “Not since the 17th century has there been such a reliance on private...Institution has estimated that citizens of some 30 countries have worked as security contractors in Iraq.6 PSC employees are generally divided by

  20. Conversion of Low Quality Waste Heat to Electric Power with Small-Scale Organic Rankine Cycle (ORC) Engine/Generator Technology

    DTIC Science & Technology

    2016-06-01

    Allan Robichaux, DPW PWD GTMO and the management and staff of the GTMO on site contractor , Centerra. Page Intentionally Left Blank ii Table of...operations and maintenance contractor to ensure that data transfers are completed as required. Figure 4 shows the location of the ORC installation on MUSE...this issue with telephone support from CRM’s controls contractor (Winn-Marion, W-M); however, the problem remained unresolved as of Sept. 1 when

  1. The Evolving Contingency Contracting Market: Private Sector Self regulation and United States Government Monitoring of Procurement of Stability Operations Services

    DTIC Science & Technology

    2016-01-01

    abuse. 62 The success of U.S. foreign policy in complex and high threat environments is dependent upon private contingency contractors for a number...Trafficking: Oversight of Contractors ’ Use of Foreign Workers in High -Risk Environments Needs to Be Strengthened,” November 2014, http://www.gao.gov...Congressional Committees, “GAO-15- 102 Human Trafficking: Oversight of Contractors ’ Use of Foreign Workers in High -Risk Environments Needs to Be

  2. Environmental Assessment of the Construction and Operation of a Solar Photovoltaic Array (SPVA) Buckley Air Force Base, Colorado

    DTIC Science & Technology

    2009-04-01

    Buckley AFB, Colorado April 2009 1-3 Figure 1-1. Buckley AFB Vicinity Map daho ’ C] Buckley AFB Boundary - - Miles 0.5 Scale Final EA...construction activities. The proposed action is located outside all quantity distance (QD) explosive clear zones. The contractor would ensure that a

  3. Starting at the End When Planning for Base Closure

    DTIC Science & Technology

    2016-05-17

    order-style mes- sages with all personnel on the base, including contractors , to ensure that everyone was aware of drawdown requirements and could...Shank All” on both the Nonsecure Internet Protocol Rout- er Network, which was mainly used for National Guard Soldiers and contractors , and the...in attendance. Manage Contractors Effectively Contractors were the logistics backbone of the TB, so a great deal of deliberate planning was

  4. Management and operating contractors' pension plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1987-06-01

    This report concerns the management of 28 M and O contractor pension plans with assets exceeding $2.6 billion in 1983. At the end of 1983, these pension plans were overfunded by $600 million. The Department could have saved $94 million in 1983 had the contractors been required to limit their pension plan contributions to the Government-established minimum level. Since 1979, the Department has continually reimbursed these contractors for contributions to pension plans that were already overfunded and we estimate that these plans are currently overfunded in excess of $1 billion. Additional annual savings of about $548,000 could be realized ifmore » the Department obtained waivers for M and O contractors participating in the Pension Benefit Guaranty Corporation's (PBGC) insurance program. Management and Administration, which has overall responsibility for controlling such costs, indicated it did not agree that contractors should fund pension plans at only the minimum required level. General agreement was indicated with the need to obtain waivers from PBGC premiums and better protect the Department's interest in contractor excess pension assets.« less

  5. 30 CFR 46.12 - Responsibility for independent contractor training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT SAND... Responsibility for independent contractor training. (a)(1) Each production-operator has primary responsibility... mine has primary responsibility for complying with §§ 46.3 through 46.10 of this part, including...

  6. 30 CFR 46.12 - Responsibility for independent contractor training.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT SAND... Responsibility for independent contractor training. (a)(1) Each production-operator has primary responsibility... mine has primary responsibility for complying with §§ 46.3 through 46.10 of this part, including...

  7. 30 CFR 46.12 - Responsibility for independent contractor training.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT SAND... Responsibility for independent contractor training. (a)(1) Each production-operator has primary responsibility... mine has primary responsibility for complying with §§ 46.3 through 46.10 of this part, including...

  8. 30 CFR 46.12 - Responsibility for independent contractor training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... EDUCATION AND TRAINING TRAINING AND RETRAINING OF MINERS ENGAGED IN SHELL DREDGING OR EMPLOYED AT SAND... Responsibility for independent contractor training. (a)(1) Each production-operator has primary responsibility... mine has primary responsibility for complying with §§ 46.3 through 46.10 of this part, including...

  9. 48 CFR 945.607-2 - Recovering precious metals.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Recovering precious metals. (b) Contractors generating contractor inventory containing precious metals shall... silver should be reported to the precious metals pool. The Oak Ridge Operations Office is responsible for... Martin Marietta Energy Systems, M.S. 8207, P.O. Box 2009, Oak Ridge, TN 37831. [54 FR 27648, June 30...

  10. 78 FR 71036 - Pipeline Safety: Random Drug Testing Rate; Contractor Management Information System Reporting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-27

    ... PHMSA-2013-0248] Pipeline Safety: Random Drug Testing Rate; Contractor Management Information System Reporting; and Obtaining Drug and Alcohol Management Information System Sign-In Information AGENCY: Pipeline... Management Information System (MIS) Data; and New Method for Operators to Obtain User Name and Password for...

  11. 23 CFR 635.110 - Licensing and qualification of contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.110 Licensing and qualification... licensing contractors, who may bid for, be awarded, or perform Federal-aid highway contracts, shall be... of a bid or before the bid may be considered for award of a contract. This, however, is not intended...

  12. 25 CFR 226.24 - Lessee's use of water.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... LANDS FOR OIL AND GAS MINING Operations § 226.24 Lessee's use of water. Lessee or his contractor may... water is taken. Similarly, Lessee or his contractor may use water from reservoirs formed by the... quantity to which they originally would have been entitled had the reservoirs not been constructed. Lessee...

  13. 25 CFR 226.24 - Lessee's use of water.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... LANDS FOR OIL AND GAS MINING Operations § 226.24 Lessee's use of water. Lessee or his contractor may... water is taken. Similarly, Lessee or his contractor may use water from reservoirs formed by the... quantity to which they originally would have been entitled had the reservoirs not been constructed. Lessee...

  14. 48 CFR 970.4402-3 - Purchasing from contractor-affiliated sources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the entities are separately incorporated. (b) Subcontracts for performance of contract work itself (as distinguished from the purchase of supplies and services needed in connection with the performance of work... and operating contractor seeks authorization to have some part of the contract work performed by a...

  15. Toxic Substances Registry System. Index of Material Safety Data Sheets

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The October 1994 revision of the KSC Toxic Substances Registry System (TSRS) Material Safety Data Sheets (MSD's) is presented. The listed MSD's which were submitted to the TSRS are maintained by the Base Operations Contractors of the Biomedical Operations and Research Office of KSC. The purpose of the index is to provide a means of accessing information on the hazards associated with the toxic and otherwise hazardous chemicals stored and used at KSC. Indices are provided for manufacturers, trademarks, and stock numbers.

  16. Retail Building Guide for Entrance Energy Efficiency Measures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stein, J.; Kung, F.

    2012-03-01

    This booklet is based on the findings of an infiltration analysis for supermarkets and large retail buildings without refrigerated cases. It enables retail building managers and engineers to calculate the energy savings potential for vestibule additions for supermarkets; and bay door operation changes in large retail stores without refrigerated cases. Retail managers can use initial estimates to decide whether to engage vendors or contractors of vestibules for pricing or site-specific analyses, or to decide whether to test bay door operation changes in pilot stores, respectively.

  17. Hanford Internal Dosimetry Program Manual, PNL-MA-552

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carbaugh, Eugene H.; Bihl, Donald E.; Maclellan, Jay A.

    2009-09-24

    This manual is a guide to the services provided by the Hanford Internal Dosimetry Program (IDP), which is operated by the Pacific Northwest National Laboratory.( ) for the U.S. Department of Energy Richland Operations Office, Office of River Protection and their Hanford Site contractors. The manual describes the roles of and relationships between the IDP and the radiation protection programs of the Hanford Site contractors. Recommendations and guidance are also provided for consideration in implementing bioassay monitoring and internal dosimetry elements of radiation protection programs.

  18. 78 FR 1256 - Guam Military Base Realignment Contractor Recruitment Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Final notice... issuing this notice to announce recruitment standards that construction contractors are required to follow... B) by adding a new subsection (6). This provision prohibits contractors engaged in construction...

  19. 77 FR 3503 - Guam Military Base Realignment Contractor Recruitment Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-24

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Notice... issuing this notice to announce the recruitment standards that construction contractors are required to... contractors engaged in construction projects related to the realignment of U.S. military forces from Okinawa...

  20. Aerospace Safety Advisory Panel

    NASA Technical Reports Server (NTRS)

    1989-01-01

    This report provides findings, conclusions and recommendations regarding the National Space Transportation System (NSTS), the Space Station Freedom Program (SSFP), aeronautical projects and other areas of NASA activities. The main focus of the Aerospace Safety Advisory Panel (ASAP) during 1988 has been monitoring and advising NASA and its contractors on the Space Transportation System (STS) recovery program. NASA efforts have restored the flight program with a much better management organization, safety and quality assurance organizations, and management communication system. The NASA National Space Transportation System (NSTS) organization in conjunction with its prime contractors should be encouraged to continue development and incorporation of appropriate design and operational improvements which will further reduce risk. The data from each Shuttle flight should be used to determine if affordable design and/or operational improvements could further increase safety. The review of Critical Items (CILs), Failure Mode Effects and Analyses (FMEAs) and Hazard Analyses (HAs) after the Challenger accident has given the program a massive data base with which to establish a formal program with prioritized changes.

  1. Evaluation of the US Department of Energy's occupational safety and health program for its government-owned contractor-operated facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The purpose of this report is to present to Secretary of Energy James Watkins the findings and recommendations of the Occupational Safety and Health Administration's (OSHA) evaluation of the Department of Energy's (DOE) programs for worker safety and health at DOE's government-owned contractor-operated (GOCO) nuclear facilities. The OSHA evaluation is based on an intensive and comprehensive review and analysis of DOE's worker safety and health programs including: written programs; safety and health inspection programs; and the adequacy of resource, training, and management controls. The evaluation began on April 10, 1990 and involved over three staff years before its conclusion. Themore » evaluation was initiated by former Secretary of Labor Elizabeth Dole in response to Secretary of Energy James Watkins' request that OSHA assist him in determining the actions needed to assure that DOE has an exemplary safety and health program in place at its GOCOs. 6 figs.« less

  2. 32 CFR 159.2 - Applicability and scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTRACTORS OPERATING IN CONTINGENCY OPERATIONS § 159.2 Applicability and scope. This part: (a) Applies to: (1... PSCs and PSC personnel performing private security functions during contingency operations outside the...

  3. Hanford facility dangerous waste permit application, general information portion. Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sonnichsen, J.C.

    1997-08-21

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit,more » which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).« less

  4. 77 FR 72905 - Pipeline Safety: Random Drug Testing Rate; Contractor MIS Reporting; and Obtaining DAMIS Sign-In...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ... Drug and Alcohol Management Information System (DAMIS) to operators, but will make the user name and... DAMIS Sign-In Information AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT... testing information must be submitted for contractors performing or ready to perform covered functions...

  5. 48 CFR 52.225-19 - Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Personnel in a...-19 Section 52.225-19 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED... military or civilian personnel separated from their unit or organization in an environment requiring them...

  6. 48 CFR 52.225-19 - Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Contractor Personnel in a...-19 Section 52.225-19 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED... military or civilian personnel separated from their unit or organization in an environment requiring them...

  7. DoD Needs to Improve the Billing System for Health Care Provided to Contractors at Medical Treatment Facilities in Southwest Asia

    DTIC Science & Technology

    2012-06-27

    8866 (DSN 664-8866). Alice F. Carey Assistant Inspector General Readiness, Operations, and Support DISTRIBUTION: UNDER SECRETARY...medical or dental care is not authorized, and contractor personnel may not receive these services at MTFs unless specifically authorized under the

  8. 25 CFR 900.94 - Is contractor-purchased real property to which an Indian tribe or tribal organization holds title...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... tribe or tribal organization holds title eligible for facilities operation and maintenance funding from... INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF... Is contractor-purchased real property to which an Indian tribe or tribal organization holds title...

  9. 25 CFR 900.94 - Is contractor-purchased real property to which an Indian tribe or tribal organization holds title...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... tribe or tribal organization holds title eligible for facilities operation and maintenance funding from... INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF... Is contractor-purchased real property to which an Indian tribe or tribal organization holds title...

  10. 25 CFR 900.94 - Is contractor-purchased real property to which an Indian tribe or tribal organization holds title...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... tribe or tribal organization holds title eligible for facilities operation and maintenance funding from... INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF... Is contractor-purchased real property to which an Indian tribe or tribal organization holds title...

  11. Powder River lures contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stremel, K.

    1984-10-01

    Drilling successes are stimulating a high level of geophysical activity in the Powder River Basin. Focused in areas of concentrated exploration, a majority of speculative surveys are specifically designed to delineate target formations. Several contractors credit available data with an increased amount of current and proposed exploration. Geophysical surveying operations in the northern Rockies are discussed.

  12. 25 CFR 273.54 - Privacy Act requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...

  13. 25 CFR 273.54 - Privacy Act requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...

  14. 25 CFR 273.54 - Privacy Act requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...

  15. 25 CFR 273.54 - Privacy Act requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...

  16. 25 CFR 273.54 - Privacy Act requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Privacy Act requirements. 273.54 Section 273.54 Indians... Privacy Act requirements. (a) When a contractor operates a system of records to accomplish a Bureau function, the contractor shall comply with subpart D of 43 CFR part 2 which implements the Privacy Act (5 U...

  17. 76 FR 77055 - Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors Regarding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ... asserted that quantitative and measurable analyses similar to those for minorities and women were needed to... provided few details about the design or operation of the California State program, and that, consequently... recommended that the contractor be required to invite voluntary self- identification at both the pre- and post...

  18. Hired Guns: Views about Armed Contractors in Operation Iraqi Freedom

    DTIC Science & Technology

    2010-01-01

    Survey Instrument Development , Sampling Procedures, and Other Data Sources . . . . . . . . . 4 Roadmap of the Monograph...Defense and State, and the U.S. Agency for International Development (USAID). However, jour- nalists, reconstruction contractors, nongovernmental...Agency for International Development (USAID). • Published literature. Our sources included government reports, memos, news- paper accounts, and

  19. Alternative trailer configurations for maximizing payloads

    Treesearch

    Jason D. Thompson; Dana Mitchell; John Klepac

    2017-01-01

    In order for harvesting contractors to stay ahead of increasing costs, it is imperative that they employ all options to maximize productivity and efficiency. Transportation can account for half the cost to deliver wood to a mill. Contractors seek to maximize truck payload to increase productivity. The Forest Operations Research Unit, Southern Research Station, USDA...

  20. 75 FR 34182 - Notice of Intent To Prepare a Programmatic Environmental Assessment for Proposed Mobile Fueling...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... Mobile Fueling Operations, Nationwide AGENCY: Postal Service. ACTION: Notice of intent to prepare a...) for the use of mobile fueling contractors to fuel postal vehicles on-site at selected Postal Service... utilize mobile fueling contractors to fuel vehicles on site at selected postal facilities located...

  1. Injury Rates on New and Old Technology Oil and Gas Rigs Operated by the Largest United States Onshore Drilling Contractor

    PubMed Central

    Blackley, David J.; Retzer, Kyla D.; Hubler, Warren G.; Hill, Ryan D.; Laney, A. Scott

    2015-01-01

    Background Occupational fatality rates among oil and gas extraction industry and specifically among drilling contractor workers are high compared to the U.S. all-industry average. There is scant literature focused on non-fatal injuries among drilling contractors, some of which have introduced engineering controls to improve rig efficiency and reduce injury risk. Methods We compared injury rates on new and old technology rigs operated by the largest U.S. drilling contractor during 2003–2012, stratifying by job type and grouping outcomes by injury severity and body part affected. Results Six hundred seventy-one injuries were recorded over 77.4 million person-hours. The rate on new rigs was 66% of that on old rigs. Roughnecks had lower injury rates on new rigs, largely through reduced limb injury rates. New rigs had lower rates in each non-fatal injury severity category. Conclusions For this company, new technology rigs appear to provide a safer environment for roughnecks. Future studies could include data from additional companies. PMID:25164118

  2. Injury rates on new and old technology oil and gas rigs operated by the largest United States onshore drilling contractor.

    PubMed

    Blackley, David J; Retzer, Kyla D; Hubler, Warren G; Hill, Ryan D; Laney, A Scott

    2014-10-01

    Occupational fatality rates among oil and gas extraction industry and specifically among drilling contractor workers are high compared to the U.S. all-industry average. There is scant literature focused on non-fatal injuries among drilling contractors, some of which have introduced engineering controls to improve rig efficiency and reduce injury risk. We compared injury rates on new and old technology rigs operated by the largest U.S. drilling contractor during 2003-2012, stratifying by job type and grouping outcomes by injury severity and body part affected. Six hundred seventy-one injuries were recorded over 77.4 million person-hours. The rate on new rigs was 66% of that on old rigs. Roughnecks had lower injury rates on new rigs, largely through reduced limb injury rates. New rigs had lower rates in each non-fatal injury severity category. For this company, new technology rigs appear to provide a safer environment for roughnecks. Future studies could include data from additional companies. © 2014 Wiley Periodicals, Inc.

  3. 500 Contractors Receiving the Largest Dollar Volume of Prime Contract Awards for Research, Development, Test, and Evaluation, Fiscal Year 1987.

    DTIC Science & Technology

    1987-01-01

    Headquarters Services Directorate for Information Operations and Reports D) ,( /NT IS lientitra on nn Iber for hIs bh act& r, s (i0 ’F H 7 FOREWORD 500...This report provides information on the 500 contractors that received the largest dollar volume in Department of Defense (DOD) prime contract awards... report presents summary data on the 500 prime contractors receiving the largest dollar volume in Department of Defense (DOD) awards over $25,000 for

  4. 78 FR 4425 - Notice of Proposed Information Collection: Comment Request; Multifamily Contractor's Mortgagor's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... Information Collection: Comment Request; Multifamily Contractor's Mortgagor's Cost Breakdowns and... comments on the subject proposal. Contractors use the form HUD-2328 to establish a schedule of values of construction items on which the monthly advances or mortgage proceeds are based. Contractors use the form HUD...

  5. 78 FR 51658 - Weighing, Feed, and Swine Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-21

    ... RIN 0580-AA99 Weighing, Feed, and Swine Contractors AGENCY: Grain Inspection, Packers and Stockyards... and swine contractors to poultry and swine production contract growers are based on accurate weighing... reweighing to add swine contractors to the list of firms that must comply, and adding feed to the list of...

  6. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  7. Selection of infectious medical waste disposal firms by using the analytic hierarchy process and sensitivity analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hsu, P.-F.; Wu, C.-R.; Li, Y.-T.

    2008-07-01

    While Taiwanese hospitals dispose of large amounts of medical waste to ensure sanitation and personal hygiene, doing so inefficiently creates potential environmental hazards and increases operational expenses. However, hospitals lack objective criteria to select the most appropriate waste disposal firm and evaluate its performance, instead relying on their own subjective judgment and previous experiences. Therefore, this work presents an analytic hierarchy process (AHP) method to objectively select medical waste disposal firms based on the results of interviews with experts in the field, thus reducing overhead costs and enhancing medical waste management. An appropriate weight criterion based on AHP is derivedmore » to assess the effectiveness of medical waste disposal firms. The proposed AHP-based method offers a more efficient and precise means of selecting medical waste firms than subjective assessment methods do, thus reducing the potential risks for hospitals. Analysis results indicate that the medical sector selects the most appropriate infectious medical waste disposal firm based on the following rank: matching degree, contractor's qualifications, contractor's service capability, contractor's equipment and economic factors. By providing hospitals with an effective means of evaluating medical waste disposal firms, the proposed AHP method can reduce overhead costs and enable medical waste management to understand the market demand in the health sector. Moreover, performed through use of Expert Choice software, sensitivity analysis can survey the criterion weight of the degree of influence with an alternative hierarchy.« less

  8. Optimal Contractor Selection in Construction Industry: The Fuzzy Way

    NASA Astrophysics Data System (ADS)

    Krishna Rao, M. V.; Kumar, V. S. S.; Rathish Kumar, P.

    2018-02-01

    A purely price-based approach to contractor selection has been identified as the root cause for many serious project delivery problems. Therefore, the capability of the contractor to execute the project should be evaluated using a multiple set of selection criteria including reputation, past performance, performance potential, financial soundness and other project specific criteria. An industry-wide questionnaire survey was conducted with the objective of identifying the important criteria for adoption in the selection process. In this work, a fuzzy set based model was developed for contractor prequalification/evaluation, by using effective criteria obtained from the percept of construction professionals, taking subjective judgments of decision makers also into consideration. A case study consisting of four alternatives (contractors in the present case) solicited from a public works department of Pondicherry in India, is used to illustrate the effectiveness of the proposed approach. The final selection of contractor is made based on the integrated score or Overall Evaluation Score of the decision alternative in prequalification as well as bid evaluation stages.

  9. 43 CFR 404.23 - How will Reclamation determine whether you or your contractor is qualified to conduct an...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... or your contractor is qualified to conduct an appraisal investigation or a feasibility study? 404.23... feasibility study yourself or though a contractor, Reclamation will evaluate whether you, your technical staff, or contractor are qualified to perform the appraisal investigation or feasibility study based on...

  10. 48 CFR 1852.216-77 - Award fee for end item contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contractor's performance for the entire contract will be evaluated to determine total earned award fee. No award fee or base fee will be paid to the Contractor if the final award fee evaluation is “poor... the Contractor's interim performance every 6* months to monitor Contractor performance prior to...

  11. 48 CFR 970.0371-9 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal....5203-3, Contractor's Organization, in all management and operating contracts. The approval authority of...

  12. 48 CFR 52.225-19 - Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...

  13. 48 CFR 52.225-19 - Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...

  14. 48 CFR 52.225-19 - Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...

  15. A Landowner's Guide to Building Forest Access Roads

    Treesearch

    Richard L. Wiest

    1998-01-01

    This guide is designed for landowners in the northeastern United States who will use a tractor and ordinary earth moving equipment to build the simplest access roads on their property, or who will contract for these services. Logging roads on small woodland properties are usually constructed by the logging contractor, sawmill operator, or by a road contractor.

  16. Research 0n Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project Based on Team Cooperation

    NASA Astrophysics Data System (ADS)

    Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi

    2018-03-01

    It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.

  17. Safety programmes in the Egyptian construction industry.

    PubMed

    Hassanein, Amr A G; Hanna, Ragaa S

    2007-12-01

    This study is aimed at exploring the nature of the safety programmes applied by large-size contractors operating in Egypt. Results revealed that safety programmes applied by those contractors were less formal than the programmes applied by their American counterparts. Only three contractors out of the surveyed sample had accident records broken down by projects, provided workers with formal safety orientation, and trained safety personnel on first-aid. The study recommended that reforms to the scheme of the employers' contribution to social insurance are necessary. This is meant to serve as a strong incentive for safety management.

  18. Advanced Orion Optimized Laser System Analysis

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Contractor shall perform a complete analysis of the potential of the solid state laser in the very long pulse mode (100 ns pulse width, 10-30 hz rep-rate) and in the very short pulse mode (100 ps pulse width 10-30 hz rep rate) concentrating on the operation of the device in the 'hot-rod' mode, where no active cooling the laser operation is attempted. Contractor's calculations shall be made of the phase aberrations which develop during the repped-pulse train, and the results shall feed into the adaptive optics analyses. The contractor shall devise solutions to work around ORION track issues. A final report shall be furnished to the MSFC COTR including all calculations and analysis of estimates of bulk phase and intensity aberration distribution in the laser output beam as a function of time during the repped-pulse train for both wave forms (high-energy/long-pulse, as well as low-energy/short-pulse). Recommendations shall be made for mitigating the aberrations by laser re-design and/or changes in operating parameters of optical pump sources and/or designs.

  19. 75 FR 5996 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ... and OMB Number: Synchronized Predeployment and Operational Tracker (SPOT) System; OMB Control Number... Operational Tracker (SPOT) System before deployment outside the United States. Data collection on contractors...

  20. Questionable payments for work of a contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-09-23

    Examination of three support contracts for international R and D disclosed fundamental weaknesses in DOE controls over the (1) receipt and acceptance of goods and services, (2) authorization and payments for work, and (3) analyses of price proposals submitted by the contractor. As a result of these weaknesses, there was no clear and convincing record of what DOE got for most of the $2.5 million it spent on these contracts. Neither was there a downward adjustment in the amounts paid by DOE under two of the contracts although such an adjustment was required by the contracts. Much of the workmore » done by the contractor was not properly authorized. Finally, analyses by the San Francisco Operations Office of certain of the price proposals submitted by the contractor did not ensure that DOE obtained a fair and reasonable price. Recommendations addressed these issues to the Procurement Office, the Controller, the Assistant Secretaries for Conservation and Renewable Energy and Fossil Energy, and the Manager, San Francisco Operations Office who indicated general agreement with the findings and a willingness to immediately pursue the remedial measure that were recommended. Their comments are appended.« less

  1. Grounds Management Cost Reduction Strategies

    DTIC Science & Technology

    1993-06-01

    AIR FORCE BASE , FLORIDA 32403-5319 1 REPORT DOCUMENTATION PAGE OMI No. 07o o’m €0k ’oJO flm4’¢• htu mgI• t O•t•f~ • ’h )fel •0W ll:• ll... FORCE INPUTS Approximately 130 ideas were submitted by individuals at Air Force MAJCOMs and bases . These ideas were reviewed by a team of Air Force ...contractor to use base Z - $ 1,200 dumpsters for reuse collection from policing operations. A-2-5 AIR FORCE GROUNDS RITU COST RIEDCTION

  2. Risk Analysis of Return Support Material on Gas Compressor Platform Project

    NASA Astrophysics Data System (ADS)

    Silvianita; Aulia, B. U.; Khakim, M. L. N.; Rosyid, Daniel M.

    2017-07-01

    On a fixed platforms project are not only carried out by a contractor, but two or more contractors. Cooperation in the construction of fixed platforms is often not according to plan, it is caused by several factors. It takes a good synergy between the contractor to avoid miss communication may cause problems on the project. For the example is about support material (sea fastening, skid shoe and shipping support) used in the process of sending a jacket structure to operation place often does not return to the contractor. It needs a systematic method to overcome the problem of support material. This paper analyses the causes and effects of GAS Compressor Platform that support material is not return, using Fault Tree Analysis (FTA) and Event Tree Analysis (ETA). From fault tree analysis, the probability of top event is 0.7783. From event tree analysis diagram, the contractors lose Rp.350.000.000, - to Rp.10.000.000.000, -.

  3. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  4. 48 CFR 52.236-10 - Operations and Storage Areas.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Operations and Storage....236-10 Operations and Storage Areas. As prescribed in 36.510, insert the following clause: Operations and Storage Areas (APR 1984) (a) The Contractor shall confine all operations (including storage of...

  5. 48 CFR 52.236-10 - Operations and Storage Areas.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Operations and Storage....236-10 Operations and Storage Areas. As prescribed in 36.510, insert the following clause: Operations and Storage Areas (APR 1984) (a) The Contractor shall confine all operations (including storage of...

  6. 48 CFR 52.236-10 - Operations and Storage Areas.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Operations and Storage....236-10 Operations and Storage Areas. As prescribed in 36.510, insert the following clause: Operations and Storage Areas (APR 1984) (a) The Contractor shall confine all operations (including storage of...

  7. 48 CFR 52.236-10 - Operations and Storage Areas.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false Operations and Storage....236-10 Operations and Storage Areas. As prescribed in 36.510, insert the following clause: Operations and Storage Areas (APR 1984) (a) The Contractor shall confine all operations (including storage of...

  8. 48 CFR 52.236-10 - Operations and Storage Areas.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false Operations and Storage....236-10 Operations and Storage Areas. As prescribed in 36.510, insert the following clause: Operations and Storage Areas (APR 1984) (a) The Contractor shall confine all operations (including storage of...

  9. 29 CFR 501.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operation, management, conservation, improvement, or maintenance of such farm and its tools and equipment... operator's own agricultural operation. H-2A Labor Contractor (H-2ALC). Any person who meets the definition...: (1) Substantial continuity of the same business operations; (2) Use of the same facilities; (3...

  10. A PIECE OF THE SPACE SHUTTLE CHALLENGER WASHED ASHORE AT COCOA BEACH

    NASA Technical Reports Server (NTRS)

    1996-01-01

    A Cocoa Beach front-end loader holds a large piece of debris from the Space Shuttle orbiter Challenger after it washed ashore in Cocoa Beach near the Coconuts on the Beach restaurant and bar. Overseeing the recovery and protection of the piece is KSC criminal investigator Jan Seinkner, facing camera at center, of EG&G Florida Inc., base operations contractor. The piece, about 15 feet by 6 feet, is believed to be part of an elevon or rudder. It is one of the biggest pieces to wash ashore to date. A smaller piece was found several blocks south. NASA recovered thousands of pounds of debris from the Atlantic Ocean after the Jan. 28, 1986 accident which destroyed the Shuttle and claimed the lives of the seven crew members; about 50 percent of the orbiter remained in the ocean after search operations were suspended. Those remains are stored at Cape Canaveral Air Station, mostly in two Minutemen silos. The two newly recovered pieces will be brought to KSC's Security Patrol Headquarters on Contractor Road for examination and temporary storage.

  11. Tank waste remediation system retrieval and disposal mission readiness-to-proceed responses to internal independent assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaus, P.S.

    1998-01-06

    The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. Themore » Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team Final Report and the Internal Assessment Final Report.« less

  12. Toxic substances registry system: Index of material safety data sheets

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The Material Safety Data Sheets (MSDSs) listed in this index reflect product inventories and associated MSDSs which have been submitted to the Toxic Substance Registry database maintained by the Base Operations Contractor at the Kennedy Space Center. The purpose of this index is to provide a means to access information on the hazards associated with the toxic and otherwise hazardous chemicals stored and used at the Kennedy Space Center.

  13. RPP-PRT-58489, Revision 1, One Systems Consistent Safety Analysis Methodologies Report. 24590-WTP-RPT-MGT-15-014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gupta, Mukesh; Niemi, Belinda; Paik, Ingle

    2015-09-02

    In 2012, One System Nuclear Safety performed a comparison of the safety bases for the Tank Farms Operations Contractor (TOC) and Hanford Tank Waste Treatment and Immobilization Plant (WTP) (RPP-RPT-53222 / 24590-WTP-RPT-MGT-12-018, “One System Report of Comparative Evaluation of Safety Bases for Hanford Waste Treatment and Immobilization Plant Project and Tank Operations Contract”), and identified 25 recommendations that required further evaluation for consensus disposition. This report documents ten NSSC approved consistent methodologies and guides and the results of the additional evaluation process using a new set of evaluation criteria developed for the evaluation of the new methodologies.

  14. Evaluation of the NASA Quality Surveillance System Pilot in Meeting Requirements for Contractor Surveillance Under Performance Based Contracting

    NASA Technical Reports Server (NTRS)

    Schmahl, Karen E.

    2002-01-01

    The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

  15. Evaluation Of The NASA Quality Surveillance System Pilot In Meeting Requirements For Contractor Surveillance Under Performance Based Contracting

    NASA Technical Reports Server (NTRS)

    Schmahl, Karen E.

    2001-01-01

    The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

  16. Strategic Management of Resource Markets: An Exploratory Study of Department of Defense Contractors.

    DTIC Science & Technology

    1982-04-01

    prime contractors focusing on (1) the operation and functional content of strategic management systems and their approaches to identifying, prioritizing...Introduction Strategic Planning for Procurement Approaches to Strategic Planning Relationship with the Procurement Process Organizational Demands Studies...planning/management with the same skill, content and commitment, what suggested improvements can come from a study of the approaches used by the more

  17. Privatized Military Operations

    DTIC Science & Technology

    2006-01-01

    environment such as that in Abu Grahib prison , where military personnel tasked with similar duties to that of contractors have been held legally accountable... Grahib Prison . The Washington Post. Office of Management and Budget Circular A-76. (August 4, 1988. Revised 1999). Performance of Commercial...downsizes the military after the Global War on Terror as it did after the Cold War. Private contractors depend largely upon former service members to

  18. US Army War College Key Strategic Issues List

    DTIC Science & Technology

    2006-07-01

    Soldier vs contractor operated and maintained tactical equipment. Are the new soldier systems so " high tech " that we cannot fight wars without contractors...approaches to meet the high tech skills demanded by our transformation TOEs? (G-3 ACD) 9. War and Society: a. Has the Army adapted from Industrial-Age...61 United States Military Academy ...................................... 65 U.S. Army Corps of Engineers

  19. Site support program plan for ICF Kaiser Hanford Company, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-10-01

    This document is the general administrative plan implemented by the Hanford Site contractor, ICF Kaiser Hanford Company. It describes the mission, administrative structure, projected staffing, to be provided by the contractor. The report breaks out the work responsibilities within the different units of the company, a baseline schedule for the different groups, and a cost summary for the different operating units.

  20. Contract Financing for Small Business

    DTIC Science & Technology

    1981-11-01

    problem. Small business contractors devote considerable management attention to operating capital and cash flow. Small business contractors are keenly...CONTRACT FINANCING 0FOR SMALL BUSINESS November 1981 -s Paul R. McClenon Prepared pursuant to Department of Defense Contract No. MDA903-81-C-0166...34 i 12 17046 DistIbufios Unlimted !I CONTRACT FINANCING FOR SMALL BUSINESS EXECUTIVE SUMMHARY To perform effectively on a contract, a firm needs

  1. Injury experience in coal mining, 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reich, R.B.; Hugler, E.C.

    1994-05-01

    This Mine Safety and Health Administration (MSHA) informational report reviews in detail the occupational injury and illness experience of coal mining in the United States for 1992. Data reported by operators of mining establishments concerning work injuries are summarized by work location, accident classification, part of body injured, nature of injury, occupation, and anthracite or bituminous coal. Related information on employment, worktime, and operating activity also is presented. Data reported by independent contractors performing certain work at mining locations are depicted separately in this report. For ease of comparison between coal mining and the metal and nonmetal mineral mining industries,more » summary reference tabulations are included at the end of both the operator and the contractor sections of this report.« less

  2. Injury experience in coal mining, 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1991-01-01

    This Mine Safety and Health Administration (MSHA) informational report reviews in detail the occupational injury and illness experience of coal mining in the United States for 1990. Data reported by operators of mining establishments concerning work injuries are summarized by work location, accident classification, part of body injured, nature of injury, occupation, and anthracite or bituminous coal. Related information on employment, worktime, and operating activity also is presented. Data reported by independent contractors performing certain work at mining locations are depicted separately in this report. For ease of comparison between coal mining and the metal and nonmetal mineral mining industries,more » summary reference tabulations are included at the end of both the operator and the contractor sections of this report.« less

  3. Report on {open_quotes}audit of internal controls over special nuclear materials{close_quotes}

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-04-01

    The Department of Energy (Department) is responsible for safeguarding a significant amount of plutonium, uranium-233 and enriched uranium - collectively referred to as special nuclear materials - stored in the United States. The Department`s office of Nonproliferation and National Security has overall management cognizance for developing policies for safeguarding these materials, while other Headquarters program offices have {open_quotes}landlord{close_quotes} responsibilities for the sites where the materials are stored, and the Department`s operations and field offices provide onsite management of contractor operations. The Department`s management and operating contractors, under the direction of the Department, safeguard and account for the special nuclear materialmore » stored at Department sites.« less

  4. Work zone operations best practices guidebook

    DOT National Transportation Integrated Search

    2000-04-01

    This guidebook is the first release of a resource designed to give state and local transportation agencies, construction contractors, transportation planners, trainers, and others with interest in work zone operations access to information and points...

  5. Operational Readiness Review Final Report for K Basin Fuel Transfer System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DAVIES, T.H.

    2002-10-01

    An Operational Readiness Review (ORR) was conducted by the U.S. Department of Energy (DOE), Richland Operations Office (RL) to verify that an adequate state of readiness had been achieved for startup of the K Basin Fuel Transfer System (FTS). The DOE ORR was conducted during the period November 6-18, 2002. The DOE ORR team concluded that the K Basin Fuel Transfer System is ready to start operations, subject to completion and verification of identified pre-start findings. The ORR was conducted in accordance with the Spent Nuclear Fuel (SNF) K Basin Fuel Transfer System (FTS) Operational Readiness Review (ORR) Plan ofmore » Action and the Operational Readiness Review Implementation Plan for K Basin Fuel Transfer System. Review activities consisted of staff interviews, procedure and document reviews, and observations of normal facility operations, operational upset conditions, and an emergency drill. The DOE ORR Team also reviewed and assessed the adequacy of the contractor ORR3 and the RL line management review. The team concurred with the findings and observations identified in these two reports. The DOE ORR for the FTS evaluated the contractor under single-shift operations. Of concern to the ORR Team was that SNF Project management intended to change from a single-shift FTS operation to a two-shift operation shortly after the completion of the DOE ORR. The ORR team did not assess two-shift FTS operations and the ability of the contractor to conduct a smooth transition from shift to shift. However, the DOE ORR team did observe an operational upset drill that was conducted during day shift and carried over into swing shift; during this drill, swing shift was staffed with fewer personnel as would be expected for two-shift operations. The facility was able to adequately respond to the event with the reduced level of staff. The ORR Team was also able to observe a Shift Manager turnover meeting when one shift manager had to be relieved during the middle of the day. The ORR Team did not have the opportunity to observe a shift turnover from one crew to another. The ORR Team has evaluated the risk of not observing this activity and considers the risk to be minimal based on the fact that operating staff are very familiar with the FTS equipment and its procedures, and because existing Conduct of Operations processes and procedures are adequate and implemented. Because the ORR Team has not observed two-shift FTS operations, we recommend that additional RL oversight be provided at the start of two-shift FTS operations to evaluate the adequacy of crew turnovers.« less

  6. 48 CFR 253.209-1 - Responsible prospective contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contracts, or contracts which provide for progress payments based on costs or on a percentage or stage of...) Packaging. An assessment of the prospective contractor's ability to meet all contractual packaging...)). (E) Plant safety. An assessment of the prospective contractor's ability to meet the safety...

  7. Ensuring Operational Access: Leveraging Engineering Contractors in the Pacific

    DTIC Science & Technology

    2015-05-21

    could leverage manpower already in theater and did not compete for limited military lift to deploy into theater.48 The second circumstance involved...Report highlighted that expeditionary contractors filled critical manpower gaps when political decisions limited the amount of military forces in a...direct the US Navy to redeploy fleet units to the Atlantic. This produced a shipping shortage in the Pacific and slowed work between May and August

  8. After Action Report: Idaho National Laboratory Annual Exercise June 10, 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barnes, Vernon Scott

    On June 10, 2015, Idaho National Laboratory (INL), in coordination with the State of Idaho, local jurisdictions, Department of Energy Idaho Operations Office (DOE-ID), and DOE Headquarters (DOE HQ), conducted the annual emergency exercise to demonstrate the ability to implement the requirements of DOE O 151.1C, “Comprehensive Emergency Management System.” The INL contractor, Battelle Energy Alliance, LLC (BEA), in coordination with other INL contractors, conducted operations and demonstrated appropriate response measures to mitigate an event and protect the health and safety of personnel, the environment, and property. Offsite response organizations participated to demonstrate appropriate response measures.

  9. Relative advantages and disadvantages of independent contractor status : a survey of owner- operators' opinions and rationale.

    DOT National Transportation Integrated Search

    2012-01-01

    "Commercial truck drivers range from company drivers that are employees of a carrier to independent owner-operators that operate under their own authority. From the drivers perspective, there are both benefits and drawbacks of being an independent...

  10. Relative advantages and disadvantages of independent contractor status : a survey of owner-operators' opinions and rationale.

    DOT National Transportation Integrated Search

    2012-01-01

    Commercial truck drivers range from company drivers that are employees of a carrier to independent owner-operators that operate under their own authority. From the drivers perspective, there are both benefits and drawbacks of being an independent ...

  11. Orbital transfer rocket engine technology: Advanced engine study

    NASA Technical Reports Server (NTRS)

    Hayden, Warren R.

    1992-01-01

    An advanced LOX/LH2 engine study for the use of NASA and vehicle prime contractors in developing concepts for manned missions to the Moon, Mars, and Phobos is documented. Parametric design data was obtained at five engine thrusts from 7.5K lbf to 50K lbf. Also, a separate task evaluated engine throttling over a 20:1 range and operation at a mixture ratio of 12 plus or minus 1 versus the 6 plus or minus 1 nominal. Cost data was also generated for DDT&E, first unit production, and factors in other life cycle costs. The major limitation of the study was lack of contact with vehicle prime contractors to resolve the issues in vehicle/engine interfaces. The baseline Aerojet dual propellant expander cycle was shown capable of meeting all performance requirements with an expected long operational life due to the high thermal margins. The basic engine design readily accommodated the 20:1 throttling requirement and operation up to a mixture ratio of 10 without change. By using platinum for baffled injector construction the increased thermal margin allowed operation up to mixture ratio 13. An initial engine modeling with an Aerojet transient simulation code (named MLETS) indicates stable engine operation with the baseline control system. A throttle ratio of 4 to 5 seconds from 10 percent to 100 percent thrust is also predicted. Performance predictions are 483.1 sec at 7.5K lbf, 487.3 sec at 20K lbf, and 485.2 sec at 50K lbf with a mixture ratio of 6 and an area ratio of 1200. Engine envelopes varied from 120 in. length/53 in. exit diameter at 7.5K lbf to 305 in. length/136 in. exit diameter at 50 K lbf. Packaging will be an important consideration. Continued work is recommended to include more vehicle prime contractor/engine contractor joint assessment of the interface issues.

  12. Improvements Needed in the Oversight of the Medical-Support Services and Award-Fee Processes under the Camp As Sayliyah, Qatar, Base Operations Support Services Contract

    DTIC Science & Technology

    2013-06-26

    in the Contract 5 Army Regulation Contradicts Federal Acquisition Regulation Requirement 6 Medical Malpractice Liability...to reflect the requirements in FAR subpart 37.4. Medical Malpractice Liability Transferred to the Government By allowing the ASG-QA command...surgeon to supervise the contractor physician assistants, contracting officials may have transferred the risk of liability for medical 7 malpractice

  13. Waste-to-Energy Thermal Destruction Identification for Forward Operating Bases

    DTIC Science & Technology

    2016-07-01

    waste disposal strategy is to simplify the technology development goals. Specifically, we recommend a goal of reducing total net energy consumption ...to net zero. The minimum objective should be the lowest possible fuel consumption per unit of waste disposed. By shifting the focus from W2E to waste...over long distances increases the risks to military personnel and contractors. Because fuel is a limited resource at FOBs, diesel fuel consumption

  14. 48 CFR 52.215-23 - Limitations on Pass-Through Charges.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... indirect costs and associated profit/fee based on such costs). No or negligible value means the Contractor... value means that the Contractor performs subcontract management functions that the Contracting Officer... Contractor or subcontractor that adds no or negligible value to a contract or subcontract, means a charge to...

  15. 20 CFR 30.5 - What are the definitions used in this part?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... contract with an entity to provide management and operation, management and integration, environmental... by an independent contractor, employed on the Menominee Indian Reservation in Wisconsin in operations conducted under a statute relating to tribal timber and logging operations on that reservation; (4) An...

  16. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATLmore » Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.« less

  17. A pattern of contractor selection for oil and gas industries in a safety approach using ANP-DEMATEL in a Grey environment.

    PubMed

    Gharedaghi, Gholamreza; Omidvari, Manouchehr

    2018-01-11

    Contractor selection is one of the major concerns of industry managers such as those in the oil industry. The objective of this study was to determine a contractor selection pattern for oil and gas industries in a safety approach. Assessment of contractors based on specific criteria and ultimately selecting an eligible contractor preserves the organizational resources. Due to the safety risks involved in the oil industry, one of the major criteria of contractor selection considered by managers today is safety. The results indicated that the most important safety criterion of contractor selection was safety records and safety investments. This represented the industry's risks and the impact of safety training and investment on the performance of other sectors and the overall organization. The output of this model could be useful in the safety risk assessment process in the oil industry and other industries.

  18. Rehabilitation of Navigation Lock Walls: Case Histories

    DTIC Science & Technology

    1987-12-01

    built prior to 1940. The average age of these 133 older lock chambers is nearly 67 years or well beyond the 50-year design ser-vice life. Since these...been to treat the projects as new work. Procedures followed for concrete operations have been those with which designers and contractors are familiar...c) discussion with project personnel, and (d) discussion wit h designers and contractors. Although the information obtained from the vario us

  19. 48 CFR 52.245-2 - Government Property Installation Operation Services.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Provisions and Clauses 52.245-2 Government Property Installation Operation Services. As prescribed in 45.107(b), insert the following clause: Government Property Installation Operation Services (AUG 2010) (a) This Government Property listed in paragraph (e) of this clause is furnished to the Contractor in an...

  20. 48 CFR 52.245-2 - Government Property Installation Operation Services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Provisions and Clauses 52.245-2 Government Property Installation Operation Services. As prescribed in 45.107(b), insert the following clause: Government Property Installation Operation Services (AUG 2010) (a) This Government Property listed in paragraph (e) of this clause is furnished to the Contractor in an...

  1. 14 CFR 120.1 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM... part 135 of this chapter, all air traffic control facilities not operated by the FAA or by or under... implement a drug and alcohol testing program under this part. (d) All contractors who elect to implement a...

  2. 29 CFR 779.317 - Partial list of establishments lacking “retail concept.”

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (such as operating instruments, X-ray machines, operating tables, etc.); establishments engaged in the... goods or facilities for the operation of such carriers (Idaho Sheet Metal Works v. Wirtz, 383 U.S. 190... distributors. Security dealers. Sheet metal contractors. Ship equipment, commercial; establishments engaged in...

  3. 29 CFR 779.317 - Partial list of establishments lacking “retail concept.”

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (such as operating instruments, X-ray machines, operating tables, etc.); establishments engaged in the... goods or facilities for the operation of such carriers (Idaho Sheet Metal Works v. Wirtz, 383 U.S. 190... distributors. Security dealers. Sheet metal contractors. Ship equipment, commercial; establishments engaged in...

  4. 14 CFR 120.1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM... part 135 of this chapter, all air traffic control facilities not operated by the FAA or by or under... implement a drug and alcohol testing program under this part. (d) All contractors who elect to implement a...

  5. 48 CFR 970.4400 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Scope. 970.4400 Section 970.4400 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4400 Scope...

  6. 48 CFR 970.4400 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Scope. 970.4400 Section 970.4400 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4400 Scope...

  7. 48 CFR 970.4400 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Scope. 970.4400 Section 970.4400 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4400 Scope...

  8. 48 CFR 970.4400 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Scope. 970.4400 Section 970.4400 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4400 Scope...

  9. 48 CFR 970.4400 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Scope. 970.4400 Section 970.4400 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4400 Scope...

  10. 48 CFR 970.2301-1 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 970.2301-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy... http://www.hss.energy.gov/pp/epp. Contractors operating DOE facilities shall comply with the...

  11. IMPLEMENTATION OF DEFENSE NUCLEAR FACILITY SAFETY BOARD RECOMMENDATION 2000-2 AT WIPP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jackson, K.; Wu, C.

    2002-02-26

    The Defense Nuclear Safeties Board (DNFSB) issued Recommendation 2000-2 on March 8, 2000, concerning the degrading conditions of vital safety systems, or systems important to nuclear safety, at DOE sites across the nation. The Board recommended that the DOE take action to assess the condition of its nuclear systems to ensure continued operational readiness of vital safety systems that are important for safely accomplishing the DOE's mission. To verify the readiness of vital safety systems, a two-phased approach was established. Phase I consisted of a qualitative assessment to approved criteria of the defined vital safety systems by operating contractor personnel,more » overseen by Federal field office personnel. Based on Phase I Assessment results, vital safety systems with significant deficiencies would be further assessed in Phase II, a more extensive quantitative assessment, by a contractor and Federal team, using a second set of criteria. In addition, Defense Nuclear Facility Safety Board Recommendation 2000-2 concluded that the degradation of confinement ventilation systems was of major concern, and issued a separate set of criteria to perform a Phase II Assessment on confinement ventilation systems.« less

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dudleson, B.; Arnold, M.; McCann, D.

    Rapid detection of unexpected drilling events requires continuous monitoring of drilling parameters. A major R and D program by a drilling contractor has led to the introduction of a computerized monitoring system on its offshore rigs. System includes advanced color graphics displays and new smart alarms to help both contractor and operator personnel detect and observe drilling events before they would normally be apparent with conventional rig instrumentation. This article describes a module of this monitoring system, which uses expert system technology to detect the earliest stages of drillstring washouts. Field results demonstrate the effectiveness of the smart alarm incorporatedmore » in the system. Early detection allows the driller to react before a twist-off results in expensive fishing operations.« less

  13. Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

  14. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  15. Calendar Year 2013 Annual Site Environmental Report for Sandia National Laboratories, Albuquerque, New Mexico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffith, Stacy

    2014-09-01

    Sandia National Laboratories, New Mexico is a government-owned/contractor-operated facility. Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, manages and operates the laboratory for the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA). The DOE/NNSA, Sandia Field Office administers the contract and oversees contractor operations at the site. This annual report summarizes data and the compliance status of Sandia Corporation’s sustainability, environmental protection, and monitoring programs through December 31, 2013. Major environmental programs include air quality, water quality, groundwater protection, terrestrial surveillance, waste management, pollution prevention, environmental restoration, oil and chemical spill prevention, and implementation of themore » National Environmental Policy Act. Environmental monitoring and surveillance programs are required by DOE Order 231.1B, Environment, Safety, and Health Reporting (DOE 2012).« less

  16. Site Environmental Report for 2016 Sandia National Laboratories California.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, Barbara L.

    Sandia National Laboratories, California (SNL/CA) is a Department of Energy (DOE) facility. The management and operations of the facility are under a contract with the DOE’s National Nuclear Security Administration (NNSA). On May 1, 2017, the name of the management and operating contractor changed from Sandia Corporation to National Technology and Engineering Solutions of Sandia, LLC (NTESS). The DOE, NNSA, Sandia Field Office administers the contract and oversees contractor operations at the site. This Site Environmental Report for 2016 was prepared in accordance with DOE Order 231.1B, Environment, Safety and Health Reporting (DOE 2012). The report provides a summary ofmore » environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2016, unless noted otherwise. General site and environmental program information is also included.« less

  17. V/STOL tilt rotor research aircraft. Volume 1: General information, revision C

    NASA Technical Reports Server (NTRS)

    Kimbell, M.; Whitener, A.

    1980-01-01

    The configuration, operation and maintenance requirements for the contractor-furnished portion of the XV-15 research instrumentation and data acquisition system are defined. Descriptions of systems operation, maintenance and checkout procedures, and cable designations are given.

  18. Safety and Mission Assurance (SMA) Automated Task Order Management System (ATOMS) Operation Manual

    NASA Technical Reports Server (NTRS)

    Wallace, Shawn; Fikes, Lou A.

    2016-01-01

    This document describes operational aspects of the ATOMS system. The information provided is limited to the functionality provided by ATOMS and does not include information provided in the contractor's proprietary financial and task management system.

  19. 12 CFR 906.12 - What outreach efforts are included in this program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... businesses unconditionally owned by minorities, women, and individuals with disabilities to provide... promote business opportunities for minorities, women, and individuals with disabilities, and businesses... BOARD ORGANIZATION AND OPERATIONS OPERATIONS Contractor Outreach Program for Businesses Owned by...

  20. The Study of the Phase Characteristics of Bragg Cells for Acousto-Optic Signal Processing

    DTIC Science & Technology

    1998-01-01

    contractor will determine the relationship of phase characteristics between TeO2 and GaAs cells with their constructive and technical parameters. Design a...Braggcell TeO2 with minimal phase distortions operating near 100 MHz. Experimentally investigate the phase characteristics for a Bragg cell on TeO2 ...follows: The contractor will determine the relationship of phase characteristics between TeO2 and GaAs cells with their constructive and technical

  1. 30 CFR 46.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... independent contractors who are engaged in mining operations; and (ii) Any construction worker who is exposed to hazards of mining operations. (2) The definition of “miner” does not include scientific workers; delivery workers; customers (including commercial over-the-road truck drivers); vendors; or visitors. This...

  2. 30 CFR 46.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... independent contractors who are engaged in mining operations; and (ii) Any construction worker who is exposed to hazards of mining operations. (2) The definition of “miner” does not include scientific workers; delivery workers; customers (including commercial over-the-road truck drivers); vendors; or visitors. This...

  3. 30 CFR 46.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... independent contractors who are engaged in mining operations; and (ii) Any construction worker who is exposed to hazards of mining operations. (2) The definition of “miner” does not include scientific workers; delivery workers; customers (including commercial over-the-road truck drivers); vendors; or visitors. This...

  4. 48 CFR 970.0371-8 - Employee disclosure concerning other employment services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371-8 Employee disclosure concerning other employment services. (a) Management and operating contractors are responsible for requiring its employees to...

  5. 46 CFR 296.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Administrator for National Security, MARAD. Contractor means the owner or operator of a vessel that enters into... certain commercial transportation resources available during time of war or national emergency or whenever determined by the Secretary of Defense to be necessary for national security or contingency operation...

  6. Weighing the Contract Option.

    ERIC Educational Resources Information Center

    Dervarics, Charles

    1993-01-01

    Contracting for noneducational services is standard operating procedure in many school districts. Private contractors are involved in transportation, food service, maintenance, and even, in rare cases, instruction. Before deciding to contract out, school boards should examine improvement to school-run operations before making a final decision.…

  7. 48 CFR 970.5232-2 - Payments and advances.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5232-2 Payments and advances. As prescribed in 970.3270(a... Contractor's rights to any refunds, rebates, allowances, accounts receivable, collections accruing to the...

  8. 48 CFR 970.5232-2 - Payments and advances.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5232-2 Payments and advances. As prescribed in 970.3270(a... Contractor's rights to any refunds, rebates, allowances, accounts receivable, collections accruing to the...

  9. 48 CFR 970.5232-2 - Payments and advances.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5232-2 Payments and advances. As prescribed in 48 CFR 970... Contractor's rights to any refunds, rebates, allowances, accounts receivable, collections accruing to the...

  10. 48 CFR 970.5232-2 - Payments and advances.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5232-2 Payments and advances. As prescribed in 970.3270(a... Contractor's rights to any refunds, rebates, allowances, accounts receivable, collections accruing to the...

  11. 48 CFR 970.5232-2 - Payments and advances.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5232-2 Payments and advances. As prescribed in 970.3270(a... Contractor's rights to any refunds, rebates, allowances, accounts receivable, collections accruing to the...

  12. 48 CFR 970.1504-1-2 - Fee policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to other performance requirements specified in the contract, DOE management and operating contractors... approved Integrated Safety Management System (ISMS), or similar document. As applicable, performance... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-1-2 Fee policy. (a) DOE...

  13. 48 CFR 970.0371-5 - Use of privileged information.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information. 970.0371-5 Section 970.0371-5 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371-5 Use of privileged information. Management and operating contractor...

  14. 48 CFR 970.0371-5 - Use of privileged information.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information. 970.0371-5 Section 970.0371-5 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371-5 Use of privileged information. Management and operating contractor...

  15. 48 CFR 970.0371-5 - Use of privileged information.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information. 970.0371-5 Section 970.0371-5 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371-5 Use of privileged information. Management and operating contractor...

  16. 48 CFR 970.0371-5 - Use of privileged information.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information. 970.0371-5 Section 970.0371-5 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371-5 Use of privileged information. Management and operating contractor...

  17. 48 CFR 970.0371-5 - Use of privileged information.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information. 970.0371-5 Section 970.0371-5 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371-5 Use of privileged information. Management and operating contractor...

  18. Providing Family Planning Services at Primary Care Organizations after the Exclusion of Planned Parenthood from Publicly Funded Programs in Texas: Early Qualitative Evidence.

    PubMed

    White, Kari; Hopkins, Kristine; Grossman, Daniel; Potter, Joseph E

    2017-10-20

    To explore organizations' experiences providing family planning during the first year of an expanded primary care program in Texas. Between November 2014 and February 2015, in-depth interviews were conducted with program administrators at 30 organizations: 7 women's health organizations, 13 established primary care contractors (e.g., community health centers, public health departments), and 10 new primary care contractors. Interviews addressed organizational capacities to expand family planning and integrate services with primary care. Interview transcripts were analyzed using a theme-based approach. Themes were compared across the three types of organizations. Established and new primary care contractors identified several challenges expanding family planning services, which were uncommon among women's health organizations. Clinicians often lacked training to provide intrauterine devices and contraceptive implants. Organizations often recruited existing clients into family planning services, rather than expanding their patient base, and new contractors found family planning difficult to integrate because of clients' other health needs. Primary care contractors frequently described contraceptive provision protocols that were not evidence-based. Many primary care organizations in Texas initially lacked the capacity to provide evidence-based family planning services that women's health organizations already provided. © Health Research and Educational Trust.

  19. Report of the Space Shuttle Management Independent Review Team

    NASA Technical Reports Server (NTRS)

    1995-01-01

    At the request of the NASA Administrator a team was formed to review the Space Shuttle Program and propose a new management system that could significantly reduce operating costs. Composed of a group of people with broad and extensive experience in spaceflight and related areas, the team received briefings from the NASA organizations and most of the supporting contractors involved in the Shuttle Program. In addition, a number of chief executives from the supporting contractors provided advice and suggestions. The team found that the present management system has functioned reasonably well despite its diffuse structure. The team also determined that the shuttle has become a mature and reliable system, and--in terms of a manned rocket-propelled space launch system--is about as safe as today's technology will provide. In addition, NASA has reduced shuttle operating costs by about 25 percent over the past 3 years. The program, however, remains in a quasi-development mode and yearly costs remain higher than required. Given the current NASA-contractor structure and incentives, it is difficult to establish cost reduction as a primary goal and implement changes to achieve efficiencies. As a result, the team sought to create a management structure and associated environment that enables and motivates the Program to further reduce operational costs. Accordingly, the review team concluded that the NASA Space Shuttle Program should (1) establish a clear set of program goals, placing a greater emphasis on cost-efficient operations and user-friendly payload integration; (2) redefine the management structure, separating development and operations and disengaging NASA from the daily operation of the space shuttle; and (3) provide the necessary environment and conditions within the program to pursue these goals.

  20. Report of the Space Shuttle Management Independent Review Team

    NASA Astrophysics Data System (ADS)

    1995-02-01

    At the request of the NASA Administrator a team was formed to review the Space Shuttle Program and propose a new management system that could significantly reduce operating costs. Composed of a group of people with broad and extensive experience in spaceflight and related areas, the team received briefings from the NASA organizations and most of the supporting contractors involved in the Shuttle Program. In addition, a number of chief executives from the supporting contractors provided advice and suggestions. The team found that the present management system has functioned reasonably well despite its diffuse structure. The team also determined that the shuttle has become a mature and reliable system, and--in terms of a manned rocket-propelled space launch system--is about as safe as today's technology will provide. In addition, NASA has reduced shuttle operating costs by about 25 percent over the past 3 years. The program, however, remains in a quasi-development mode and yearly costs remain higher than required. Given the current NASA-contractor structure and incentives, it is difficult to establish cost reduction as a primary goal and implement changes to achieve efficiencies. As a result, the team sought to create a management structure and associated environment that enables and motivates the Program to further reduce operational costs. Accordingly, the review team concluded that the NASA Space Shuttle Program should (1) establish a clear set of program goals, placing a greater emphasis on cost-efficient operations and user-friendly payload integration; (2) redefine the management structure, separating development and operations and disengaging NASA from the daily operation of the space shuttle; and (3) provide the necessary environment and conditions within the program to pursue these goals.

  1. John F. Kennedy Space Center, Safety, Reliability, Maintainability and Quality Assurance, Survey and Audit Program

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This document is the product of the KSC Survey and Audit Working Group composed of civil service and contractor Safety, Reliability, and Quality Assurance (SR&QA) personnel. The program described herein provides standardized terminology, uniformity of survey and audit operations, and emphasizes process assessments rather than a program based solely on compliance. The program establishes minimum training requirements, adopts an auditor certification methodology, and includes survey and audit metrics for the audited organizations as well as the auditing organization.

  2. Control Based Mobile Ad Hoc Networking for Survivable, Dynamic, Mobile Special Operation Force Communications

    DTIC Science & Technology

    2009-09-01

    The second phase started in March 2008 and ended in July 2009 [40]. By the time this paper is complete, the contractor will be working on final steps... cinematic images we see on our televisions or movie theater screens. Sure, some of it is just as, if not more, thrilling than what we all have come to...ITMANET): Mission.‖ [Online]. Available: http://www.darpa.mil/ipto/programs/itmanet/itmanet.asp. [Accessed: March 5, 2009]. [8] ―ITMANET Solicitation

  3. The 1990 NASA Aerospace Battery Workshop

    NASA Technical Reports Server (NTRS)

    Kennedy, Lewis M. (Compiler)

    1991-01-01

    This document contains the proceedings of the 21st annual NASA Aerospace Battery Workshop, hosted by the Marshall Space Flight Center on December 4-6, 1990. The workshop was attended by scientists and engineers from various agencies of the U.S. Government, aerospace contractors, and battery manufacturers as well as participation in like kind from the European Space Agency member nations. The subjects covered included nickel-cadmium, nickel-hydrogen, silver-zinc, lithium based chemistries, and advanced technologies as they relate to high reliability operations in aerospace applications.

  4. Chronology of KSC and KSC related events, 1982

    NASA Technical Reports Server (NTRS)

    Nail, K., Jr.

    1984-01-01

    The history of activities at the Kennedy Space Center in 1982 is presented as reflected in NASA News Releases and selected periodicals. Items are arranged in chronological order by date of the published sources. Actual data date of the event may be indicated in parenthesis when the article itself does not make that information explicit. Highlights of the year's activities include three launchings of the orbiter Columbia; successful launches of communications satellites using expendable vehicles; major changes in contracting; and the selection of a base operations contractor.

  5. U.S. Navy In-House Cost Estimates for CITA: Operations Overhead

    DTIC Science & Technology

    1980-06-01

    sector as it specifically relates t o Government contractors using the Cost Accounting Standar ds Board ’s criteria, and DD " 0 ".. 1~73 I JAN 71...34’-• • • • • a.AII l as required by the OMB Circular A-76. The Navy’s accounting systems, as they relate to the collection of expenses for cost ...used by other nonprofit organizations, by the private sector as it specifically relates to Government contractors using the Cost Accounting

  6. The Department of Defense’s Use of Private Security Contractors in Iraq and Afghanistan: Background, Analysis, and Options for Congress

    DTIC Science & Technology

    2010-01-19

    they are generally considered to be support personnel under Title X. 34 A 2007 study published by the Combat Studies Institute determined the tooth...for which it contracts with private companies in military operations. Congress has generally accepted the concept of using unarmed contractors to...installations and U.S. embassies and consulates in a number of countries where stability generally is not an issue. 3 According to one report, “Not

  7. Defense Contractor Recovery of Cleanup Costs at Contractor Owned and Operated Facilitie

    DTIC Science & Technology

    1993-09-30

    incurred in defending a civil litigation brought by a third party, regardless of the outcome are ’ prima facie ’ reasonable and allowable, unless shown to...actual knowledge has a higher duty to reveal because of the greater likelihood that the presence of such a substance would affect the cost of the... duties ". 23DJ. Barclay & Company, ASBCA Nos. 29005 and 30250, 88-2 BCA 20,741 2-7 • • •! !MW because the proximate cause of the spill was the

  8. 41 CFR 109-50.001 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS UTILIZATION AND DISPOSAL... direct DOE operations and to designated contractors only when specifically provided for in the...

  9. KSC Headquarters Building Groundbreaking Ceremony

    NASA Image and Video Library

    2014-10-07

    Groundbreaking for the new Central Campus will take place in the Industrial Area at NASA's Kennedy Space Center in Florida. Kennedy Center Director Bob Cabana welcomes members of the media and guests to the ceremony. To his right is Nancy Bray, director of Kennedy's Center Operations Directorate. To his left is Kirk Hazen, southeast district manager and vice president of Hensel Phelps, the construction contractor. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees.

  10. 12 CFR 906.11 - Who may participate in the outreach program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ORGANIZATION AND OPERATIONS OPERATIONS Contractor Outreach Program for Businesses Owned by Minorities, Women..., women, and individuals with disabilities, and businesses unconditionally owned by them, may participate... 1630.3. (b) Minority means Black or African American, American Indian or Alaska Native, Hispanic or...

  11. Heavy Equipment Operator: General Equipment Operator. Instructional Materials.

    ERIC Educational Resources Information Center

    Hendrix, Laborn J.; Sawatzky, Joyce

    Developed through close coordination between contractors, construction workers, and vocational educators, this instructor's manual is designed to help heavy equipment instructors present materials in a systematic format. The instructional materials in the manual are written in terms of student performance, using measurable behavioral objectives.…

  12. 48 CFR 17.605 - Award, renewal, and extension.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Award, renewal, and extension. (a) Effective work performance under management and operating contracts... requirements and the unusual (sometimes unique) nature of the work performed under management and operating contracts, the Government is often limited in its ability to effect competition or to replace a contractor...

  13. 12 CFR 906.11 - Who may participate in the outreach program?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ORGANIZATION AND OPERATIONS OPERATIONS Contractor Outreach Program for Businesses Owned by Minorities, Women..., women, and individuals with disabilities, and businesses unconditionally owned by them, may participate... 1630.3. (b) Minority means Black or African American, American Indian or Alaska Native, Hispanic or...

  14. Airborne Oceanographic Lidar (AOL) (Global Carbon Cycle)

    NASA Technical Reports Server (NTRS)

    2003-01-01

    This bimonthly contractor progress report covers the operation, maintenance and data management of the Airborne Oceanographic Lidar and the Airborne Topographic Mapper. Monthly activities included: mission planning, sensor operation and calibration, data processing, data analysis, network development and maintenance and instrument maintenance engineering and fabrication.

  15. 32 CFR 159.1 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Purpose. 159.1 Section 159.1 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE SECURITY PRIVATE SECURITY CONTRACTORS OPERATING IN CONTINGENCY OPERATIONS § 159.1 Purpose. This part establishes policy, assigns responsibilities and provides...

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Melancon, R.

    In June, 1995, the National Petroleum Refiners Association (NPRA) adhoc committee on Contractor Safety Training, turned over the task of developing reciprocity agreements with all Contractor Safety Training Councils to the Executive Directors of each of the Council`s. The Council representatives were to develop these agreements based on the NPRA adhoc committee training objectives that were developed jointly by representatives of the petroleum industry, chemical industry, contractors and the Council`s.

  17. 48 CFR 252.235-7003 - Frequency authorization.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... characteristics of the proposed electromagnetic radiating device to the Contracting Officer during the initial... Contractor shall provide the technical operating characteristics of the proposed electromagnetic radiating...

  18. Quality based prequalification of contractors

    DOT National Transportation Integrated Search

    2001-08-01

    This report summarizes the efforts to provide the Kentucky Transportation Cabinet with a system for evaluating the quality of the performance of contractors on highway construction projects and using that evaluation in the Cabinet's annual prequalifi...

  19. Performance-Based Contractor Prequalification as an Alternative to Performance Bonds

    DOT National Transportation Integrated Search

    2014-08-01

    State departments of transportation rely on private industry construction contractors to build, rehabilitate, and replace their infrastructure assets. The Federal Highway Administration (FHWA) is interested in providing guidance that State transporta...

  20. 48 CFR 970.0371-6 - Incompatibility between regular duties and private interests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371-6 Incompatibility between regular duties and private interests. (a) Employees of a management and operating contractor shall not be permitted to make...

  1. 49 CFR 192.16 - Customer notification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... serve yard lanterns, pool heaters, or other types of secondary equipment. Also, “maintain” means monitor... notify each customer once in writing of the following information: (1) The operator does not maintain the... in advance, and the excavation done by hand. (5) The operator (if applicable), plumbing contractors...

  2. 48 CFR 970.5203-2 - Performance improvement and collaboration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... in the communication of the success of improvements to other management and operating contractors in... management and operation of the contract. This may entail the alteration of existing practices or the... approaches consistent with the statement of work and performance measures of this contract. (b) The...

  3. 48 CFR 970.5203-2 - Performance improvement and collaboration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... in the communication of the success of improvements to other management and operating contractors in... management and operation of the contract. This may entail the alteration of existing practices or the... approaches consistent with the statement of work and performance measures of this contract. (b) The...

  4. 48 CFR 970.2902-3 - Other Federal tax exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... is considered that a request for an additional exemption in the performance of a management and... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Taxes 970.2902-3 Other Federal tax exemptions... such services when furnished to Department of Energy (DOE) management and operating contractors who pay...

  5. 48 CFR 970.1504-1-2 - Fee policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... approved Integrated Safety Management System (ISMS), or similar document. As applicable, performance... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-1-2 Fee policy. (a) DOE management and operating contractors may be paid a fee in accordance with the requirements of this subsection...

  6. 48 CFR 970.5227-10 - Patent rights-management and operating contracts, nonprofit organization or small business firm...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... operate, in the case of a machine or system; and, in each case, under such conditions as to establish that... request title within sixty (60) days after learning of the failure of the Contractor to disclose or to...

  7. 48 CFR 970.5227-10 - Patent rights-management and operating contracts, nonprofit organization or small business firm...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... operate, in the case of a machine or system; and, in each case, under such conditions as to establish that... request title within sixty (60) days after learning of the failure of the Contractor to disclose or to...

  8. 48 CFR 970.5227-10 - Patent rights-management and operating contracts, nonprofit organization or small business firm...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... operate, in the case of a machine or system; and, in each case, under such conditions as to establish that... request title within sixty (60) days after learning of the failure of the Contractor to disclose or to...

  9. 48 CFR 2009.470 - Appeals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2009.470 Appeals. A... for Operations. A copy of the notice of appeal must be furnished to the debarring/suspending official. ...

  10. 48 CFR 17.605 - Award, renewal, and extension.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.605... prospective contractor's technical and managerial capacity are sufficient, that organizational conflicts of...

  11. EG&G Florida, Inc., KSC base operations contractor Launch Readiness Assessment System

    NASA Technical Reports Server (NTRS)

    Geaslen, W. D.

    1988-01-01

    A computerized Launch Readiness Assessment System (LRAS) which compares 'current status' of readiness against the 'required status' of readiness for the Space Shuttle. The five subsystems of the LRAS are examined in detail. The LRAS Plan specifies the overall system requirements, procedures, and reports. The LRAS Manager drives the operation of the LRAS system. The Responding Units (RU) maintain support plans and procedures which specify the detail requirements for each mission or milestone. The Master Data Tables contain the milestone, responsible RU relationships, and requirements assessment categories. The LRAS Status System serves as the launch readiness assessment reporting system. The relationships between these subsystems are displayed in diagrams.

  12. Common occupational classification system - revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stahlman, E.J.; Lewis, R.E.

    1996-05-01

    Workforce planning has become an increasing concern within the DOE community as the Office of Environmental Restoration and Waste Management (ER/WM or EM) seeks to consolidate and refocus its activities and the Office of Defense Programs (DP) closes production sites. Attempts to manage the growth and skills mix of the EM workforce while retaining the critical skills of the DP workforce have been difficult due to the lack of a consistent set of occupational titles and definitions across the complex. Two reasons for this difficulty may be cited. First, classification systems commonly used in industry often fail to cover inmore » sufficient depth the unique demands of DOE`s nuclear energy and research community. Second, the government practice of contracting the operation of government facilities to the private sector has introduced numerous contractor-specific classification schemes to the DOE complex. As a result, sites/contractors report their workforce needs using unique classification systems. It becomes difficult, therefore, to roll these data up to the national level necessary to support strategic planning and analysis. The Common Occupational Classification System (COCS) is designed to overcome these workforce planning barriers. The COCS is based on earlier workforce planning activities and the input of technical, workforce planning, and human resource managers from across the DOE complex. It provides a set of mutually-exclusive occupation titles and definitions that cover the broad range of activities present in the DOE complex. The COCS is not a required record-keeping or data management guide. Neither is it intended to replace contractor/DOE-specific classification systems. Instead, the system provides a consistent, high- level, functional structure of occupations to which contractors can crosswalk (map) their job titles.« less

  13. Westinghouse, DOE see apples, oranges in IG staffing report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lobsenz, G.

    1994-03-01

    The operator of the Energy Department's Savannah River weapons plant has at least 1,800 more employees than it needs, and could save $400 million over a five-year period by cutting its staff accordingly, a DOE inspector general study says. Most of the boat - 1,206 employees - was attributed to excessive numbers of managers, with the inspector general concluding that Westinghouse Savannah River Co. had roughly twice as many layers of management than two other DOE weapons contractors. The study also concluded that Westinghouse in fiscal year 1992 significantly understated its actual staffing levels in reports to DOE, failing tomore » disclose 1,765 full-time employees or the equivalent hours worked. Through such underreporting Westinghouse was able to [open quotes]circumvent staffing ceilings established by the department,[close quotes] the study added. Overall, DOE Inspector General John Layton said Westinghouse's staff levels substantially exceeded those needed for efficient operation of the South Carolina nuclear weapons facility. Layton based his analysis on efficiency standards attained by other DOE weapons plant contractors, such as Martin Marietta Energy Systems at DOE's Oak Ridge, Tenn., plant and EG G Rocky Flats, as well as widely utilized worker performance requirements used by the Navy and private sector companies that perform work similar to that done at Savannah River.« less

  14. Performance-Based Contractor Prequalification as an Alternative to Performance Bonds [Tech Brief

    DOT National Transportation Integrated Search

    2014-01-01

    State transportation departments must rely on private industry construction contractors to build, rehabilitate, and replace their infrastructure assets. The Federal Highway Administration (FHWA) is interested in ensuring that State transportation dep...

  15. 41 CFR 109-27.5106-5 - Assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Precious Metals Sales and Recovery operates the precious metals pool. DOE organizations and contractors may... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 27...

  16. 41 CFR 109-27.5106-5 - Assistance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Precious Metals Sales and Recovery operates the precious metals pool. DOE organizations and contractors may... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 27...

  17. 24 CFR 581.2 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...-owned, contractor-operated machinery, equipment, land, and other facilities reported excess for sale.... (10) Easements. (11) Property purchased in whole or in part with Federal funds if title to the...

  18. 48 CFR 970.0370-1 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of... participate in efforts by those contractors to address common problems or the institution of improvements. It...

  19. 41 CFR 101-39.306 - Operator's packet.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standard Form 149, U.S. Government National Credit Card; (f) List of contractors from which vehicle operators may purchase items authorized by the SF 149, U.S. Government National Credit Card; (g) Accident... safeguarding and protecting the SF 149, U.S. Government National Credit Card. [51 FR 11023, Apr. 1, 1986, as...

  20. 41 CFR 101-39.306 - Operator's packet.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Standard Form 149, U.S. Government National Credit Card; (f) List of contractors from which vehicle operators may purchase items authorized by the SF 149, U.S. Government National Credit Card; (g) Accident... safeguarding and protecting the SF 149, U.S. Government National Credit Card. [51 FR 11023, Apr. 1, 1986, as...

  1. 41 CFR 101-39.306 - Operator's packet.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Standard Form 149, U.S. Government National Credit Card; (f) List of contractors from which vehicle operators may purchase items authorized by the SF 149, U.S. Government National Credit Card; (g) Accident... safeguarding and protecting the SF 149, U.S. Government National Credit Card. [51 FR 11023, Apr. 1, 1986, as...

  2. 41 CFR 101-39.306 - Operator's packet.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Standard Form 149, U.S. Government National Credit Card; (f) List of contractors from which vehicle operators may purchase items authorized by the SF 149, U.S. Government National Credit Card; (g) Accident... safeguarding and protecting the SF 149, U.S. Government National Credit Card. [51 FR 11023, Apr. 1, 1986, as...

  3. 41 CFR 101-39.306 - Operator's packet.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standard Form 149, U.S. Government National Credit Card; (f) List of contractors from which vehicle operators may purchase items authorized by the SF 149, U.S. Government National Credit Card; (g) Accident... safeguarding and protecting the SF 149, U.S. Government National Credit Card. [51 FR 11023, Apr. 1, 1986, as...

  4. 'Commitment' secures rooftop SSD contract.

    PubMed

    Davies, John

    2010-01-01

    John Davies, operations manager of multi-disciplinary mechanical and electrical and construction contractor cfes, describes a "turnkey" project that the company is undertaking for the Yeovil District Hospital (YDH) NHS Foundation Trust, involving both the design and construction of a new sterile services department, and substantial input into the facility's subsequent operation and management.

  5. 48 CFR 970.2703-1 - Purposes of patent rights clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2703-1... Department of Energy by a contractor, pursuant to management and operating contracts that are generally... et seq. (Bayh-Dole Act), or a large business, as a result of a class patent waiver issued pursuant to...

  6. 48 CFR 970.2770-4 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2770-4... facility management and operating contract. (b) If the contractor is a nonprofit organization or small business eligible under 35 U.S.C. 200 et seq., to receive title to any inventions under the contract and...

  7. 32 CFR 159.4 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Policy. 159.4 Section 159.4 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE SECURITY PRIVATE SECURITY CONTRACTORS OPERATING IN CONTINGENCY OPERATIONS § 159.4 Policy. (a) Consistent with the requirements of paragraph (a)(2) of section 862...

  8. SRS SWPF Construction Completion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Craig, Jack; Sheppard, Frank; Marks, Pam

    Now that construction is complete, DOE and construction contractor Parsons, are focusing on testing the Savannah River Site’s Salt Waste Processing Facility (SWPF) systems and training the workforce to operate the plant in preparation for the start of operations. Once in operation, the SWPF will significantly increase processing rates at SRS tank farms in an effort to empty the site’s high-level radioactive waste tanks.

  9. James Webb Space Telescope: Supporting Multiple Ground System Transitions in One Year

    NASA Technical Reports Server (NTRS)

    Detter, Ryan; Fatig, Curtis; Steck, Jane

    2004-01-01

    Ideas, requirements, and concepts developed during the very early phases of the mission design often conflict with the reality of a situation once the prime contractors are awarded. This happened for the James Webb Space Telescope (JWST) as well. The high level requirement of a common real-time ground system for both the Integration and Test (I&T), as well as the Operation phase of the mission is meant to reduce the cost and time needed later in the mission development for re-certification of databases, command and control systems, scripts, display pages, etc. In the case of JWST, the early Phase A flight software development needed a real-time ground system and database prior to the spacecraft prime contractor being selected. To compound the situation, the very low level requirements for the real-time ground system were not well defined. These two situations caused the initial real-time ground system to be switched out for a system that was previously used by the Bight software development team. To meet the high-!evel requirement, a third ground system was selected based on the prime spacecraft contractor needs and JWST Project decisions. The JWST ground system team has responded to each of these changes successfully. The lessons learned from each transition have not only made each transition smoother, but have also resolved issues earlier in the mission development than what would normally occur.

  10. 32 CFR 651.10 - Actions requiring environmental analysis.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... engineering, laser testing, and electromagnetic pulse generation. (i) Leases, easements, permits, licenses, or..., loans, or other forms of funding such as Government-Owned, Contractor-Operated (GOCO) industrial plants...

  11. 32 CFR 651.10 - Actions requiring environmental analysis.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... engineering, laser testing, and electromagnetic pulse generation. (i) Leases, easements, permits, licenses, or..., loans, or other forms of funding such as Government-Owned, Contractor-Operated (GOCO) industrial plants...

  12. 32 CFR 651.10 - Actions requiring environmental analysis.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... engineering, laser testing, and electromagnetic pulse generation. (i) Leases, easements, permits, licenses, or..., loans, or other forms of funding such as Government-Owned, Contractor-Operated (GOCO) industrial plants...

  13. 32 CFR 651.10 - Actions requiring environmental analysis.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... engineering, laser testing, and electromagnetic pulse generation. (i) Leases, easements, permits, licenses, or..., loans, or other forms of funding such as Government-Owned, Contractor-Operated (GOCO) industrial plants...

  14. Veterans’ Health Care: Improved Oversight of Community Care Physicians Credentials Needed

    DTIC Science & Technology

    2016-09-01

    Physicians’ Credentials Needed What GAO Found GAO found that the Department of Veterans Affairs’ (VA) contractors —Health Net Federal Services (Health...program, but were deficient in doing so under another program. Based on GAO’s review of selected physicians, GAO found that the contractors almost...program consistent with the requirements of the contract. In contrast, the contractors did not always verify credentials of the physicians in the

  15. Tapping Transaction Costs to Forecast Acquisition Cost Breaches

    DTIC Science & Technology

    2016-01-01

    Diameter Bomb Increment II (SDB II) Space Based Infrared System (SBIRS) High Program Standard Missile (SM) - 2 Block IV Stryker Family of Vehicles...some limitations. First, the activities included in this category will vary somewhat from contractor to contractor. As a result, a small portion of...contract may vary over time as new costs are defined by the contractor as being related to SE/PM. This could explain a small portion of the increase in

  16. Maintaining space shuttle safety within an environment of change

    NASA Astrophysics Data System (ADS)

    Greenfield, Michael A.

    1999-09-01

    In the 10 years since the Challenger accident, NASA has developed a set of stable and capable processes to prepare the Space Shuttle for safe launch and return. Capitalizing on the extensive experience gained from a string of over 50 successful flights, NASA today is changing the way it does business in an effort to reduce cost. A single Shuttle Flight Operations Contractor (SFOC) has been chosen to operate the Shuttle. The Government role will change from direct "oversight" to "insight" gained through understanding and measuring the contractor's processes. This paper describes the program management changes underway and the NASA Safety and Mission Assurance (S&MA) organization's philosophy, role, and methodology for pursuing this new approach. It describes how audit and surveillance will replace direct oversight and how meaningful performance metrics will be implemented.

  17. KSC-2014-4206

    NASA Image and Video Library

    2014-10-07

    CAPE CANAVERAL, Fla. – Groundbreaking for the new Central Campus will take place in the Industrial Area at NASA's Kennedy Space Center in Florida. Kennedy Center Director Bob Cabana welcomes members of the media and guests to the ceremony. To his right is Nancy Bray, director of Kennedy's Center Operations Directorate. To his left is Kirk Hazen, southeast district manager and vice president of Hensel Phelps, the construction contractor. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees. Photo credit: NASA/Kim Shiflett

  18. NASA-6 atmospheric measuring station. [calibration, functional checks, and operation of measuring instruments

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Information required to calibrate, functionally check, and operate the Instrumentation Branch equipment on the NASA-6 aircraft is provided. All procedures required for preflight checks and in-flight operation of the NASA-6 atmospheric measuring station are given. The calibration section is intended for only that portion of the system maintained and calibrated by IN-MSD-12 Systems Operation contractor personnel. Maintenance is not included.

  19. Summary Report of the Seventh Annual NASA/Contractors Conference on Quality and Productivity: "Total Quality Leadership"

    NASA Technical Reports Server (NTRS)

    1991-01-01

    More than 750 NASA, government, contractor, and academic representatives attended the Seventh Annual NASA/Contractors Conference on Quality and Productivity on October 12-13, 1990, in Grenelefe, Florida. The panel presentations and keynote speeches revolving around the theme of 'Total Quality Leadership" provided a solid base of understanding of the importance, benefits, and principles of total quality management. The implementation of these strategies is critical if we are to effectively pursue our mission of continuous quality improvement and reliability in our products, processes, and services. The annual NASA/contractors conferences serve as catalysts for achieving success in this mission.

  20. 75 FR 33237 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... from DCMA insurance/pension specialists and DCAA auditors, determines a CIPR is needed based on a risk... needs to follow up on contractor implementation of prior CIPR recommendations. (c) The DCAA auditor...

  1. Use of COTS in the Multimission Advanced Ground Intelligent Control (MAGIC) program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crowley, N.L.

    1997-11-01

    This tutorial will discuss the experiences of the Space System Technologies Division of the USAF Phillips Laboratory (PL/VTS) in developing a COTS-based satellite control system. The system`s primary use is a testbed for new technologies that are intended for future integration into the operational satellite control system. As such, the control system architecture must be extremely open and flexible so we can integrate new components and functions easily and also provide our system to contractors for their component work. The system is based on commercial hardware, is based on Windows NT, and makes the maximum use of COTS components andmore » industry standards.« less

  2. A Model for NASA-KSC's Privatization Transition

    NASA Technical Reports Server (NTRS)

    Lavelle, Jerome P.; Krumwiede, Dennis W.; Flowers, Jean

    1996-01-01

    This paper describes a model for government agencies that are considering privatization of all or part of their functions. Privatization encompasses the transitioning of government functions from government run to contractor run. The model developed in this paper is used to analyze the National Aeronautics and Space Administration's (NASA) decision to privatize space shuttle operations at the Kennedy Space Center (KSC). Several specific recommendations are given to KSC as they attempt to operationalize this privatization decision at the Center and to transition to a new relationship with their contractors.

  3. Using Heuristics for Supportability Analysis of Adaptive Weapon Systems in Combat

    DTIC Science & Technology

    2017-01-01

    a n/a Customer Requirements Im p o rt an ce w ei g ht f ac to r F o rc e to o p en E xt er na l d im en si o ns C D p o si ti o ni ng f ea tu...usually include Contractor Logistics Support (CLS), and the contract structure normally incentivizes CLS to exceed the KPP Operational Readiness...adaptive baseline, a viable plan for maximizing availability and reducing costs would involve an early design effort for replacing contractor maintenance

  4. Directory of DOE and contractor training and development personnel: TRADE (Training Resources and Data Exchange)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-03-01

    The 1988 update of the Directory lists DOE headquarters operations office and DOE contractor personnel who are involved with training and development activities. This update is substantially bigger than previous issues because it identifies all personnel who have participated in TRADE activities over the past few years. The purpose of the listing is to encourage DOE and contractor personnel to share training resources and information. This update identifies active members in TRADE Special interest Groups. In addition to a SIG designation next to the name of each member, (for example: John Robinson, RPT SIG), subdirectories in the last section ofmore » the Directory list all active members for individual SIGs. The addition of these subdirectories is in direct response to requests from DOE and the TRADE Executive Committee.« less

  5. Sources of Occupational Stress and Prevalence of Burnout and Clinical Distress Among U.S. Air Force Cyber Warfare Operators

    DTIC Science & Technology

    2013-01-01

    distress within the cyber warfare community. This study involved cyber warfare operators including active duty (n = 376) and civilian contractor and...revealed that when compared to civilian cyber warfare operators, active duty cyber warfare operators are more likely to suffer from the facets of...8217 write-in responses revealed cyber warfare operators attributed shift work, shift changes, and hours worked as the primary sources of high occupational

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Training programs at DOE facilities should prepare personnel to safely and efficiently operate and maintain the facilities in accordance with DOE requirements. This guide presents good practices for a systematic approach to on-the-job training (OJT) and OJT programs and should be used in conjunction with DOE Training Program Handbook: A Systematic Approach to Training, and with the DOE Handbook entitled Alternative Systematic Approaches to Training to develop performance-based OJT programs. DOE contractors may also use this guide to modify existing OJT programs that do not meet the systematic approach to training (SAT) objectives.

  7. Fuel cell technology program

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A fuel cell technology program was established to advance the state-of-the art of hydrogen oxygen fuel cells using low temperature, potassium hydroxide electrolyte technology as the base. Cell and component testing confirmed that low temperature, potassium hydroxide electrolyte technology is compatible with the requirements of the space shuttle Phase B contractors. Testing of the DM-1 powerplant demonstrated all of the important requirements of the shuttle except operating life. Testing also identified DM-1 powerplant life limiting mechanisms; hydrogen pump gear wear and pressurization of the cell stack over its design limits.

  8. 48 CFR 970.0371-3 - Definition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of... employed by the contractor, both full and part-time, who are assigned to work under a DOE management and...

  9. 77 FR 32592 - Procurement List; Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... Force, FA4686 9 CONS LGC, Beale AFB, CA. Service Type/Location: Contractor-Operated Civil Engineer Supply Store (COCESS), 30th Civil Engineering Squadron, 1515 Iceland Avenue, Room 150, Vandenberg AFB, CA...

  10. 32 CFR 154.18 - Certain positions not necessarily requiring access to classified information.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... contract employee (including commercial carrier) operating a vehicle or providing security to a vehicle... military, civilian personnel, consultants, and contractor personnel performing on unclassified automated...

  11. Factors and values of willingness to pay for improved construction waste management--a perspective of Malaysian contractors.

    PubMed

    Begum, Rawshan Ara; Siwar, Chamhuri; Pereira, Joy Jacqueline; Jaafar, Abdul Hamid

    2007-01-01

    Malaysia is facing an increase in the generation of waste and of accompanying problems with the disposal of this waste. In the last two decades, extensive building and infrastructure development projects have led to an increase in the generation of construction waste material. The construction industry has a substantial impact on the environment, and its environmental effects are in direct relation to the quality and quantity of the waste it generates. This paper discusses general characteristics of the construction contractors, the contractors' willingness to pay (WTP) for improved construction waste management, determining factors which affect the amount of their willingness to pay, and suggestions and policy implications in the perspective of construction waste management in Malaysia. The data in this study is based on contractors registered with the construction industry development board (CIDB) of Malaysia. Employing the open ended contingent valuation method, the study assessed the contractors' average maximum WTP for improved construction waste management to be RM69.88 (1US$=3.6 RM) per tonne of waste. The result shows that the average maximum WTP is higher for large contractors than for medium and small contractors. The highest average maximum WTP value is RM88.00 for Group A (large contractors) RM78.25 for Group B (medium-size contractors) and RM55.80 for Group C (small contractors). One of the contributions of this study is to highlight the difference of CIDB registration grade in the WTP for improved construction waste management. It is found that contractors' WTP for improved waste collection and disposal services increases with the increase in contractors' current paid up capital. The identified factors and determinants of the WTP will assist the formulation of appropriate policies in addressing the construction waste problem in Malaysia and indirectly improve the quality of construction in the country.

  12. KSC-04PD-1290

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. Towers and girders are the current construction components on the Operations Support Building (OSB) II in the Launch Complex 39 Area. The new building, which replaces modular housing constructed more than 20 years ago, will house NASA and contractor support staff for shuttle operations. The new structure is projected to be ready in April 2005.

  13. KSC-04PD-1288

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. Another phase of construction is shown on the Operations Support Building (OSB) II in the Launch Complex 39 Area. The new building, which replaces modular housing constructed more than 20 years ago, will house NASA and contractor support staff for shuttle operations. The new structure is projected to be ready in April 2005.

  14. KSC-04PD-1291

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. Towers and girders are the current construction components on the Operations Support Building (OSB) II in the Launch Complex 39 Area. The new building, which replaces modular housing constructed more than 20 years ago, will house NASA and contractor support staff for shuttle operations. The new structure is projected to be ready in April 2005.

  15. KSC-04PD-1289

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. Towers and girders are the current construction components on the Operations Support Building (OSB) II in the Launch Complex 39 Area. The new building, which replaces modular housing constructed more than 20 years ago, will house NASA and contractor support staff for shuttle operations. The new structure is projected to be ready in April 2005.

  16. 48 CFR 252.228-7001 - Ground and flight risk.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contracting Officer. (5) Flight crew member means the pilot, the co-pilot, and, unless otherwise provided in... includes any pilot or operator of an unmanned aerial vehicle. If required, a defense systems operator may.... (4) For task order and delivery order contracts, the Contractor's share of the loss shall be the...

  17. 12 CFR 906.13 - How does the Finance Board oversee and monitor the outreach program?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 7 2011-01-01 2011-01-01 false How does the Finance Board oversee and monitor the outreach program? 906.13 Section 906.13 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOUSING FINANCE BOARD ORGANIZATION AND OPERATIONS OPERATIONS Contractor Outreach Program for Businesses...

  18. 12 CFR 906.10 - Why does the Finance Board have this outreach program?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 7 2011-01-01 2011-01-01 false Why does the Finance Board have this outreach program? 906.10 Section 906.10 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOUSING FINANCE BOARD ORGANIZATION AND OPERATIONS OPERATIONS Contractor Outreach Program for Businesses Owned by...

  19. Analysis of Security Contractors in Deployed Environments

    DTIC Science & Technology

    2006-12-01

    35 2. Proper Training and Education .......................................................36 3. Improve Overall Contract Visibility...like to acknowledge the work of P. W. Singer , author of the book titled “Corporate Warriors,” whose dedicated research and thorough analysis on the...skills, including combat operations, strategic planning, intelligence, risk assessment, operational support, training , and technical skills.”3 CPFF

  20. 48 CFR 970.2703-2 - Patent rights clause provisions for management and operating contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-exempted areas of technology or in operation of DOE facilities primarily dedicated to naval nuclear... for-profit, large business firm and the contract does not have a technology transfer mission or if... dedicated to naval nuclear propulsion or weapons related programs. That clause provides for DOE's statutory...

  1. 48 CFR 970.2703-2 - Patent rights clause provisions for management and operating contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-exempted areas of technology or in operation of DOE facilities primarily dedicated to naval nuclear... for-profit, large business firm and the contract does not have a technology transfer mission or if... dedicated to naval nuclear propulsion or weapons related programs. That clause provides for DOE's statutory...

  2. Alaska Department of Natural Resources

    Science.gov Websites

    /08/2018 First Day Hikes planned in Delta Junction, Homer, Sitka, Ketchikan, and Juneau 12/27/2017 searchable online tool 07/31/2017 Contracts awarded for private operation of Delta Area state parks 07/31 Outdoor Recreation Director 07/06/2017 State seeks private contractors to operate Delta Area state parks

  3. 14 CFR 139.329 - Pedestrians and ground vehicles.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... by an employee, tenant, or contractor; (c) When an air traffic control tower is in operation, ensure... between the tower and the pedestrian, vehicle, or escort; (d) When an air traffic control tower is not in operation, or there is no air traffic control tower, provide adequate procedures to control pedestrians and...

  4. Concentrating Solar Power Projects - ISCC Ain Beni Mathar | Concentrating

    Science.gov Websites

    Location: Ain Beni Mathar (Ain Beni Mathar) Owner(s): ONE (Office National de l'Electricite) (100 Project Type: Commercial Participants Developer(s): Abener Owner(s) (%): ONE (Office National de l'Electricite) (100%) EPC Contractor: Abener Operator(s): Abengoa Solar / ONE Generation Offtaker(s): ONE

  5. 48 CFR 3052.236-70 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... effort to reduce the disruption of the Contractor's operation. (b) Unless otherwise specified by local... daylight hours and by red lights at other times. The red lights along the edge of the construction areas... shall provide adequate watch to maintain the lights in working condition at all times other than...

  6. Technoeconomic analysis of conventional logging systems operating from stump to landing

    Treesearch

    Raymond L. Sarles; William G. Luppold; William G. Luppold

    1986-01-01

    Analyzes technical and economic factors for six conventional logging systems suitable for operation in eastern forests. Discusses financial risks and business implications for loggers investing in high-production, state-of-the-art logging systems. Provides logging contractors with information useful as a preliminary guide for selection of equipment and systems....

  7. Developing Tomorrows Space War Fighter: The Argument for Contracting Out Satellite Operations

    DTIC Science & Technology

    2015-12-01

    intelligence agencies to operate in a de- nied or degraded space environment through focused education, training, and exercises and through new doctrine...Integrated Defending space will be a team effort that will involve contributions of the intelligence community, commercial partners, and allied...Operations We will build a more diverse and balanced workforce among military, civilian, and contractor components. These professionals must be educated

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mehra, S.; Bryce, T.

    Sedco Forex has recently completed a new land drilling rig, currently deployed in Gabon, that integrates well construction activities with multiskilling to create cost savings across the board in drilling operations. Historically, operators have produced a comprehensive tender package specifying strictly the type and size of individual rig components and the number of personnel required to drill. In this case, the drilling contractor provides a fit-for-purpose rig, consistent with field location, well profile, operator`s priorities, and local constraints.

  9. A New, Integrated Approach to Army Operational Testing and Evaluation

    DTIC Science & Technology

    1977-11-04

    simulation should be reviewed to determine if there are areas that may or could produce data to support OT. During the Validation Phase the operational...II must provide the data for a valid estimate of the system’s military utility, operational effectiveness and operational suitability (including...the necessity of planning to acquire supplementary data . This data may be derived by analysis or obtained in tests (contractor, development and/or

  10. 48 CFR 52.232-32 - Performance-Based Payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... is endangered by the Contractor's (i) failure to make progress, or (ii) unsatisfactory financial... title; (iii) Nondurable (i.e., noncapital) tools, jigs, dies, fixtures, molds, patterns, taps, gauges... Government access. The Contractor shall promptly furnish reports, certificates, financial statements, and...

  11. 48 CFR 45.000 - Scope of part.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Government has acquired a lien or title solely because of partial, advance, progress, or performance-based... Section 45.000 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT... Government property to contractors, contractors' management and use of Government property, and reporting...

  12. ACHP | Working Together to Build a More Inclusive Preservation Program

    Science.gov Websites

    Manager. He has over a decade of experience in the construction industry as a contractor and project working on my Masters, I was employed by an Athens, GA-based general contractor who specialized in

  13. 48 CFR 1417.602 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for cost comparison purposes under OMB Circular A-76 (see FAR 7.3) for: (1) Operation, maintenance, or... commercial or industrial service activity which, if performed by a contractor, would result in a management...

  14. 48 CFR 52.204-2 - Security Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DOD 5220.22-M... architect-engineer contract, add the following paragraph (e) to the basic clause: (e) The Contractor shall...

  15. Locations Accessible | FNLCR Staging

    Cancer.gov

    The Frederick National Laboratory for Cancer Research campus is located 50 miles northwest of Washington, D.C., and 50 miles west of Baltimore, Maryland, in Frederick, Maryland.Operations and Technical Support contractor Leidos Biomedical Resea

  16. Lead-based paint awareness, work practices, and compliance during residential construction and renovation.

    PubMed

    Blando, James D; Antoine, Nickita; Lefkowitz, Daniel

    2013-05-01

    The U.S. Environmental Protection Agency recently implemented the Renovation, Repair and Painting (RRP) rule that applies to pre-1978 residences because of the potential presence of lead-based paint. Enforcement of this rule may be difficult and therefore it is crucial to understand the awareness and beliefs of contractors and the general public because these will likely be major determinants of exposures resulting from residential renovation work. The study described in this article utilized two mailed surveys: one directed to the general public and the other directed to contractors. The surveys were conducted in New Jersey and Virginia. Field observations were also recorded for work sites in New Jersey. Results indicated a high awareness among the general public about the hazards of lead, a low level of screening by children's doctors for lead exposure, frequent use of work practices that generate lots of dust, poor hygiene among contractors, and the potential for low compliance of contractors with the RRP rule. In particular, contractors who do not believe lead is a serious health hazard are expected to have the lowest compliance with the RRP rule. These findings serve as targets for effective public health interventions through education and outreach.

  17. Space station automation and robotics study. Operator-systems interface

    NASA Technical Reports Server (NTRS)

    1984-01-01

    This is the final report of a Space Station Automation and Robotics Planning Study, which was a joint project of the Boeing Aerospace Company, Boeing Commercial Airplane Company, and Boeing Computer Services Company. The study is in support of the Advanced Technology Advisory Committee established by NASA in accordance with a mandate by the U.S. Congress. Boeing support complements that provided to the NASA Contractor study team by four aerospace contractors, the Stanford Research Institute (SRI), and the California Space Institute. This study identifies automation and robotics (A&R) technologies that can be advanced by requirements levied by the Space Station Program. The methodology used in the study is to establish functional requirements for the operator system interface (OSI), establish the technologies needed to meet these requirements, and to forecast the availability of these technologies. The OSI would perform path planning, tracking and control, object recognition, fault detection and correction, and plan modifications in connection with extravehicular (EV) robot operations.

  18. Annual Site Environmental Report Sandia National Laboratories, Albuquerque, New Mexico, Calendar year 2007

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Agogino, Karen; Sanchez, Rebecca

    2008-09-30

    Sandia National Laboratories, New Mexico (SNL/NM) is a government-owned/contractor-operated facility. Sandia Corporation (Sandia), a wholly owned subsidiary of Lockheed Martin Corporation, manages and operates the laboratory for the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA). The DOE/NNSA Sandia Site Office (SSO) administers the contract and oversees contractor operations at the site. This annual report summarizes data and the compliance status of Sandia Corporation’s environmental protection and monitoring programs through December 31, 2007. Major environmental programs include air quality, water quality, groundwater protection, terrestrial surveillance, waste management, pollution prevention (P2), environmental restoration (ER), oil and chemical spill prevention,more » and implementation of the National Environmental Policy Act (NEPA). Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2007a) and DOE Manual 231.1-1A, Environment, Safety, and Health Reporting (DOE 2007).« less

  19. Particulate Hot Gas Stream Cleanup Technical Issues: Quarterly report, July 1-September 30, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pontius, D.H.

    1996-12-09

    This is the eighth in a series of quarterly reports describing the activities performed under Contract No. DE-AC21-94MC31160. Analyses of Hot Gas Stream Cleanup (HGCU) ashes and descriptions of filter performance address aspects of filter operation that are apparently linked to the characteristics of the collected ash or the performance of the ceramic barrier filter elements. Task 1 is designed to generate a data base of the key characteristics of ashes collected from operating advanced particle filters (APFS) and to relate these ash properties to the operation and performance of these filters. Task 2 concerns testing and failure analysis ofmore » ceramic filter elements. Under Task I during the past quarter, additional analyses were performed on ashes from the Ahlstrom 10 MWt Pressurized Fluidized Circulating Fluid Bed (PCFB) facility located at Karhula, Finland. Work continued on the HGCU data base being constructed in Microsoft Access. A variety of information has been entered into the data base, including numerical values, short or long text entries, and photographs. Detailed design of a bench top device for high temperature measurement of ash permeability has also begun. In addition to these activities, a paper was prepared and a poster was presented summarizing recent work performed under this contract at the 1996 DOE/METC Contractor`s Conference. A presentation was also given corresponding to the manuscript entitled Particle Characteristics and High-Temperature Filtration that was prepared for publication in the Proceedings of the Thirteenth Annual International Pittsburgh Coal Conference held this September in Pittsburgh, PA. Arrangements have been made to be present at the DOE/METC Modular Gas Cleanup Rig (MGCR) at the conclusion of the next run of the DOE/METC air blown Fluid Bed Gasifier (FBG). This visit will include on-site sampling to collect and characterize the filter cakes collected during FGB operation. Task 2 efforts during the past quarter focused on hoop tensile testing of Schumacher FT20 and Refractron 326 candle filter elements removed from the Karhula APF after 540 hours of service.« less

  20. Summary and evaluation of the conceptual design study of a potential early commercial MHD power plant (CSPEC)

    NASA Technical Reports Server (NTRS)

    Staiger, P. J.; Penko, P. F.

    1982-01-01

    The conceptual design study of a potential early commercial MHD power plant (CSPEC) is described and the results are summarized. Each of two contractors did a conceptual design of an approximtely 1000 MWe open-cycle MHD/steam plant with oxygen enriched combustion air preheated to an intermediate temperatue in a metallic heat exchanger. The contractors were close in their overall plant efficiency estimates but differed in their capital cost and cost of electricity estimates, primarily because of differences in balance-of-plant material, contingency, and operating and maintenance cost estimates. One contractor concluded that its MHD plant design compared favorably in cost of electricity with conventional coal-fired steam plants. The other contractor is making such a comparison as part of a follow-on study. Each contractor did a preliminary investigation of part-load performance and plant availability. The results of NASA studies investigating the effect of plant size and oxidizer preheat temperature on the performance of CSPEC-type MHD plants are also described. The efficiency of a 1000 MWe plant is about three points higher than of a 200 MWe plant. Preheating to 1600 F gives an efficiency about one and one-half points higher than preheating to 800 F for all plant sizes. For each plant size and preheat temperature there is an oxidizer enrichment level and MHD generator length that gives the highest plant efficiency.

  1. Site environmental report for 2009 : Sandia National Laboratories, California.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, Barbara L.

    2010-06-01

    Sandia National Laboratories, California (SNL/CA) is a government-owned/contractor-operated laboratory. Sandia Corporation, a Lockheed Martin Company, operates the laboratory for the Department of Energy's National Nuclear Security Administration (NNSA). The NNSA Sandia Site Office oversees operations at the site, using Sandia Corporation as a management and operating contractor. This Site Environmental Report for 2009 was prepared in accordance with DOE Order 231.1A (DOE 2004a). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2009. General site and environmental program information is also included. The Site Environmental Report is divided into tenmore » chapters. Chapter 1, the Executive Summary, highlights compliance and monitoring results obtained in 2009. Chapter 2 provides a brief introduction to SNL/CA and the existing environment found on site. Chapter 3 summarizes SNL/CA's compliance activities with the major environmental requirements applicable to site operations. Chapter 4 presents information on environmental management, performance measures, and environmental programs. Chapter 5 presents the results of monitoring and surveillance activities in 2009. Chapter 6 discusses quality assurance. Chapters 7 through 9 provide supporting information for the report and Chapter 10 is the report distribution list.« less

  2. Navy Controls for Invoice, Receipt, Acceptance, and Property Transfer System Need Improvement

    DTIC Science & Technology

    2016-02-25

    iR APT as a web-based system to electronically invoice, receipt, and accept ser vices and product s from its contractors and vendors. The iR APT system...electronically shares document s bet ween DoD and it s contractors and vendors to eliminate redundant data entr y, increase data accuracy, and reduce...The iR APT system allows contractors to submit and track invoices and receipt and acceptance documents over the web and allows government personnel to

  3. 32 CFR 2004.20 - National Industrial Security Program Operating Manual (NISPOM) [201(a)].

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... phases of the contracting process. (b) As a general rule, procedures for safeguarding classified information by contractors and recommendations for changes shall be addressed through the NISPOM coordination...

  4. Space Shuttle Project

    NASA Image and Video Library

    1977-11-18

    This photograph shows Solid Rocket Booster segments undergoing stacking operations in Marshall Space Flight Center's Building 4707. The Solid Rocket Boosters were designed in-house at the Marshall Center with the Thiokol Corporation as the prime contractor.

  5. 50 CFR 229.5 - Requirements for Category III fisheries.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... personnel, a designated contractor, or an official observer, or authorized otherwise by a scientific research permit in the possession of the operator. (d) Monitoring. Vessel owners engaged in a Category III...

  6. 50 CFR 229.5 - Requirements for Category III fisheries.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... personnel, a designated contractor, or an official observer, or authorized otherwise by a scientific research permit in the possession of the operator. (d) Monitoring. Vessel owners engaged in a Category III...

  7. 41 CFR 102-75.1165 - What is the applicability of this subpart?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...-owned, contractor-operated machinery, equipment, land, and other facilities reported excess for sale... interests subject to reversion. (10) Easements. (11) Property purchased in whole or in part with Federal...

  8. KSC Headquarters Building Groundbreaking Ceremony

    NASA Image and Video Library

    2014-10-07

    Groundbreaking for the new Central Campus took place in the Industrial Area at NASA's Kennedy Space Center in Florida. Kennedy Center Director Bob Cabana speaks to members of the media and guests during the ceremony. Behind Cabana is Nancy Bray, director of Kennedy's Center Operations Directorate. From far left, are Steve Belflower, vice president of HuntonBrady Architects of Orlando, and Kirk Hazen, southeast district manager and vice president of Hensel Phelps, the construction contractor. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees.

  9. KSC Headquarters Building Groundbreaking Ceremony

    NASA Image and Video Library

    2014-10-07

    Groundbreaking for the new Central Campus took place in the Industrial Area at NASA's Kennedy Space Center in Florida. Kirk Hazen, southeast district manager and vice president of Hensel Phelps, the construction contractor, speaks to members of the media and guests during the groundbreaking ceremony. Behind him is Nancy Bray, director of Kennedy's Center Operations Directorate. To his right is Kennedy Center Director Bob Cabana. To his left is Steve Belflower, vice president of HuntonBrady Architects of Orlando. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees.

  10. KSC-2014-4207

    NASA Image and Video Library

    2014-10-07

    CAPE CANAVERAL, Fla. – Groundbreaking for the new Central Campus took place in the Industrial Area at NASA's Kennedy Space Center in Florida. Kennedy Center Director Bob Cabana speaks to members of the media and guests during the ceremony. Behind Cabana is Nancy Bray, director of Kennedy's Center Operations Directorate. From far left, are Steve Belflower, vice president of HuntonBrady Architects of Orlando, and Kirk Hazen, southeast district manager and vice president of Hensel Phelps, the construction contractor. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees. Photo credit: NASA/Kim Shiflett

  11. KSC Headquarters Building Groundbreaking Ceremony

    NASA Image and Video Library

    2014-10-07

    Groundbreaking for the new Central Campus took place in the Industrial Area at NASA's Kennedy Space Center in Florida. Kennedy Center Director Bob Cabana speaks to members of the media and guests during the groundbreaking ceremony. To his right is Nancy Bray, director of Kennedy's Center Operations Directorate. From far left, are Steve Belflower, vice president of HuntonBrady Architects of Orlando, and Kirk Hazen, southeast district manager and vice president of Hensel Phelps, the construction contractor. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees.

  12. KSC Headquarters Building Groundbreaking Ceremony

    NASA Image and Video Library

    2014-10-07

    Groundbreaking for the new Central Campus took place in the Industrial Area at NASA's Kennedy Space Center in Florida. Digging in with shovels during the groundbreaking ceremony, are Dan Tweed, associate director for Facilities at Kennedy Steve Belflower, vice president of HuntonBrady Architects of Orlando Nancy Bray, director of Kennedy's Center Operations Directorate Kennedy Center Director Bob Cabana Kirk Hazen, southeast district manager and vice president of Hensel Phelps, the construction contractor and Kelvin Manning, Kennedy's associate director. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees.

  13. KSC Headquarters Building Groundbreaking Ceremony

    NASA Image and Video Library

    2014-10-07

    Groundbreaking for the new Central Campus took place in the Industrial Area at NASA's Kennedy Space Center in Florida. Nancy Bray, director of Kennedy's Center Operations Directorate, speaks to members of the media and guests during the ceremony. To her right is Kennedy Center Director Bob Cabana. From far left, are Steve Belflower, vice president of HuntonBrady Architects of Orlando, and Kirk Hazen, southeast district manager and vice president of Hensel Phelps, the construction contractor. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees.

  14. KSC Headquarters Building Groundbreaking Ceremony

    NASA Image and Video Library

    2014-10-07

    Groundbreaking for the new Central Campus took place in the Industrial Area at NASA's Kennedy Space Center in Florida. Steve Belflower, vice president of HuntonBrady Architects of Orlando, speaks to members of the media and guests during the groundbreaking ceremony. Behind him is Nancy Bray, director of Kennedy's Center Operations Directorate. To his right is Kennedy Center Director Bob Cabana. To his left is Kirk Hazen, southeast district manager and vice president of Hensel Phelps, the construction contractor. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees.

  15. Private Sector Adds to the Menu.

    ERIC Educational Resources Information Center

    Donovan, Sharon

    1997-01-01

    Two school districts, Kennewick School District WA and Salem-Keizer School District OR, are leveraging their food service contractor's resources to establish work-based courses stressing sophisticated management, culinary, and life skills. Under these instructional partnerships, the contractor, cooperating with school officials, develops the…

  16. 10 CFR 436.33 - Procedures and methods for contractor selection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... for contractor selection. (a) Competitive selection. Competitive selections based on solicitation of... synopsizes the proposed contract action. (2) Each competitive solicitation— (i) Shall request technical and... from those within the competitive range. (b) Unsolicited proposals. Federal agencies may— (1) Consider...

  17. Unions, Contractors and CTE

    ERIC Educational Resources Information Center

    Jarosz, Francesca

    2006-01-01

    Across Illinois, in places where unions thrive, construction industry professionals and career and technical education (CTE) teachers are working together in promoting work-based learning program to students. Likewise, the outreach program provides union-supported contractors with qualified candidates for future employment. Programs such as the…

  18. Report: EPA Lacks Processes to Validate Whether Contractors Receive Specialized Role-Based Training for Network and Data Protection

    EPA Pesticide Factsheets

    Report #17-P-0344, July 31, 2017. The EPA is unaware whether information security contractors possess the skills and training needed to protect the agency’s information, data and network from security breaches.

  19. 48 CFR 1552.216-77 - Award term incentive.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performance measures for the corresponding evaluation period; or (iii) The Government notifies the contractor....216-77 Section 1552.216-77 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY...) based on overall contractor performance as evaluated in accordance with the Clause entitled “Award Term...

  20. Anomalous event diagnosis for environmental satellite systems

    NASA Technical Reports Server (NTRS)

    Ramsay, Bruce H.

    1993-01-01

    The National Oceanic and Atmospheric Administration's (NOAA) National Environmental Satellite, Data, and Information Service (NESDIS) is responsible for the operation of the NOAA geostationary and polar orbiting satellites. NESDIS provides a wide array of operational meteorological and oceanographic products and services and operates various computer and communication systems on a 24-hour, seven days per week schedule. The Anomaly Reporting System contains a database of anomalous events regarding the operations of the Geostationary Operational Environmental Satellite (GOES), communication, or computer systems that have degraded or caused the loss of GOES imagery. Data is currently entered manually via an automated query user interface. There are 21 possible symptoms (e.g., No Data), and 73 possible causes (e.g., Sectorizer - World Weather Building) of an anomalous event. The determination of an event's cause(s) is made by the on-duty computer operator, who enters the event in a paper based daily log, and by the analyst entering the data into the reporting system. The determination of the event's cause(s) impacts both the operational status of these systems, and the performance evaluation of the on-site computer and communication operations contractor.

  1. The role of metrics and measurements in a software intensive total quality management environment

    NASA Technical Reports Server (NTRS)

    Daniels, Charles B.

    1992-01-01

    Paramax Space Systems began its mission as a member of the Rockwell Space Operations Company (RSOC) team which was the successful bidder on a massive operations consolidation contract for the Mission Operations Directorate (MOD) at JSC. The contract awarded to the team was the Space Transportation System Operations Contract (STSOC). Our initial challenge was to accept responsibility for a very large, highly complex and fragmented collection of software from eleven different contractors and transform it into a coherent, operational baseline. Concurrently, we had to integrate a diverse group of people from eleven different companies into a single, cohesive team. Paramax executives recognized the absolute necessity to develop a business culture based on the concept of employee involvement to execute and improve the complex process of our new environment. Our executives clearly understood that management needed to set the example and lead the way to quality improvement. The total quality management policy and the metrics used in this endeavor are presented.

  2. Functional Analysis and Preliminary Specifications for a Single Integrated Central Computer System for Secondary Schools and Junior Colleges. Interim Report.

    ERIC Educational Resources Information Center

    1968

    The present report proposes a central computing facility and presents the preliminary specifications for such a system. It is based, in part, on the results of earlier studies by two previous contractors on behalf of the U.S. Office of Education. The recommendations are based upon the present contractors considered evaluation of the earlier…

  3. Out of the Shadows: The Health and Well-Being of Private Contractors Working in Conflict Environments.

    PubMed

    Dunigan, Molly; Farmer, Carrie M; Burns, Rachel M; Hawks, Alison; Setodji, Claude Messan

    2014-01-01

    Over the past decade, private contractors have been deployed extensively around the globe. In addition to supporting U.S. and allied forces in Iraq and Afghanistan, contractors have assisted foreign governments, nongovernmental organizations, and private businesses by providing a wide range of services, including base support and maintenance, logistical support, transportation, intelligence, communications, construction, and security. At the height of the conflicts in Iraq and Afghanistan, contractors outnumbered U.S. troops deployed to both theaters. Although these contractors are not supposed to engage in offensive combat, they may nonetheless be exposed to many of the stressors that are known to have physical and mental health implications for military personnel. RAND conducted an online survey of a sample of contractors who had deployed on contract to a theater of conflict at least once between early 2011 and early 2013. The survey collected demographic and employment information, along with details about respondents' deployment experience (including level of preparation for deployment, combat exposure, and living conditions), mental health (including probable posttraumatic stress disorder, depression, and alcohol misuse), physical health, and access to and use of health care. The goal was to describe the contractors' health and well-being and to explore differences across the sample by such factors as country of citizenship, job specialty, and length and frequency of contract deployment. The findings provide a foundation for future studies of contractor populations and serve to inform policy decisions affecting contractors, including efforts to reduce barriers to mental health treatment for this population.

  4. 48 CFR 9904.401-60 - Illustrations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... manufacturing overhead to be applied to an estimated direct labor base. He identifies the items included in his... performance 4. Contractor estimates a total dollar amount for engineering labor which includes disparate and significant elements or functions of engineering labor. Contractor does not provide supporting data...

  5. 48 CFR 9904.401-60 - Illustrations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... manufacturing overhead to be applied to an estimated direct labor base. He identifies the items included in his... performance 4. Contractor estimates a total dollar amount for engineering labor which includes disparate and significant elements or functions of engineering labor. Contractor does not provide supporting data...

  6. 48 CFR 9904.401-60 - Illustrations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... manufacturing overhead to be applied to an estimated direct labor base. He identifies the items included in his... performance 4. Contractor estimates a total dollar amount for engineering labor which includes disparate and significant elements or functions of engineering labor. Contractor does not provide supporting data...

  7. 48 CFR 1509.406-3 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension and Ineligibility 1509.406-3 Procedures. (a... who do not appear on the GSA Consolidated List; e.g., those who are ineligible based on a settlement...) Obtain the HCA's recommendation prior to reaching a voluntary exclusion settlement with a Contractor in...

  8. 32 CFR 806b.36 - Disposing of records.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Defense Reutilization and Marketing Office or through activities that manage a base-wide recycling program. The recycling sales contract must contain a clause requiring the contractor to safeguard privacy.... Originators must safeguard Privacy Act material until it is transferred to the recycling contractor. A Federal...

  9. 32 CFR 806b.36 - Disposing of records.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Defense Reutilization and Marketing Office or through activities that manage a base-wide recycling program. The recycling sales contract must contain a clause requiring the contractor to safeguard privacy.... Originators must safeguard Privacy Act material until it is transferred to the recycling contractor. A Federal...

  10. 32 CFR 806b.36 - Disposing of records.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Defense Reutilization and Marketing Office or through activities that manage a base-wide recycling program. The recycling sales contract must contain a clause requiring the contractor to safeguard privacy.... Originators must safeguard Privacy Act material until it is transferred to the recycling contractor. A Federal...

  11. 32 CFR 806b.36 - Disposing of records.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Defense Reutilization and Marketing Office or through activities that manage a base-wide recycling program. The recycling sales contract must contain a clause requiring the contractor to safeguard privacy.... Originators must safeguard Privacy Act material until it is transferred to the recycling contractor. A Federal...

  12. 32 CFR 806b.36 - Disposing of records.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Defense Reutilization and Marketing Office or through activities that manage a base-wide recycling program. The recycling sales contract must contain a clause requiring the contractor to safeguard privacy.... Originators must safeguard Privacy Act material until it is transferred to the recycling contractor. A Federal...

  13. Application of fuzzy logic-neural network based reinforcement learning to proximity and docking operations: Special approach/docking testcase results

    NASA Technical Reports Server (NTRS)

    Jani, Yashvant

    1993-01-01

    As part of the RICIS project, the reinforcement learning techniques developed at Ames Research Center are being applied to proximity and docking operations using the Shuttle and Solar Maximum Mission (SMM) satellite simulation. In utilizing these fuzzy learning techniques, we use the Approximate Reasoning based Intelligent Control (ARIC) architecture, and so we use these two terms interchangeably to imply the same. This activity is carried out in the Software Technology Laboratory utilizing the Orbital Operations Simulator (OOS) and programming/testing support from other contractor personnel. This report is the final deliverable D4 in our milestones and project activity. It provides the test results for the special testcase of approach/docking scenario for the shuttle and SMM satellite. Based on our experience and analysis with the attitude and translational controllers, we have modified the basic configuration of the reinforcement learning algorithm in ARIC. The shuttle translational controller and its implementation in ARIC is described in our deliverable D3. In order to simulate the final approach and docking operations, we have set-up this special testcase as described in section 2. The ARIC performance results for these operations are discussed in section 3 and conclusions are provided in section 4 along with the summary for the project.

  14. Guide to good practices for operations and administration updates through required reading

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-12-01

    The purpose of this Guide to Good Practices is to provide Department of Energy (DOE) contractors with information that can be used to validate and/or modify existing programs relative to Conduct of Operations. This Guide to Good Practices is part of a series of guides designed to enhance the guidelines set forth in DOE Order 5480. 19, Conduct of Operations Requirements for DOE Facilities.'' (JDB)

  15. Guide to good practices for operations and administration updates through required reading

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-12-01

    The purpose of this Guide to Good Practices is to provide Department of Energy (DOE) contractors with information that can be used to validate and/or modify existing programs relative to Conduct of Operations. This Guide to Good Practices is part of a series of guides designed to enhance the guidelines set forth in DOE Order 5480. 19, ``Conduct of Operations Requirements for DOE Facilities.`` (JDB)

  16. SRS SWPF Construction Completion

    ScienceCinema

    Craig, Jack; Sheppard, Frank; Marks, Pam

    2018-01-16

    Now that construction is complete, DOE and construction contractor Parsons, are focusing on testing the Savannah River Site’s Salt Waste Processing Facility (SWPF) systems and training the workforce to operate the plant in preparation for the start of operations. Once in operation, the SWPF will significantly increase processing rates at SRS tank farms in an effort to empty the site’s high-level radioactive waste tanks.

  17. Standard Missile-6 (SM-6)

    DTIC Science & Technology

    2016-12-01

    and Maintenance ACAT - Acquisition Category ADM - Acquisition Decision Memorandum APB - Acquisition Program Baseline APPN - Appropriation APUC...Acquisition Program MILCON - Military Construction N/A - Not Applicable O&M - Operations and Maintenance ORD - Operational Requirements Document OSD...RMS) Contractor Location: 1151 Hermans Road Tucson, AZ 85756 Contract Number: N00024-13-C-5407/0 Contract Type: Firm Fixed Price (FFP) Award Date

  18. 77 FR 18858 - Remanded Biological Opinions on the Coordinated Long-Term Operation of the Central Valley Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    ... Long-Term Operation of the Central Valley Project and State Water Project: Notice of Intent To Prepare... Central Valley Project, in a coordinated manner with the State Water Project, that are likely to avoid... Department of Water Resources, California Department of Fish and Game, State and Federal Contractors Water...

  19. 12 CFR 906.10 - Why does the Finance Board have this outreach program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Why does the Finance Board have this outreach program? 906.10 Section 906.10 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOUSING FINANCE BOARD ORGANIZATION AND OPERATIONS OPERATIONS Contractor Outreach Program for Businesses Owned by Minorities, Women, or Individuals With Disabilitie...

  20. Work Zone Design and Operations Enhancements

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  1. Work zone and operation enhancements.

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  2. U.S. Army Modernizes Munitions Plants

    ERIC Educational Resources Information Center

    Environmental Science and Technology, 1972

    1972-01-01

    Headquartered at Joliet, Illinois, the Army Ammunition Procurement and Supply Agency aims to mechanize and clean up its manufacturing facilities. Six go-co (government owned - contractor operated) plants involved in the modernization program are described. (BL)

  3. 41 CFR 50-204.34 - AEC licensees-AEC contractors operating AEC plants and facilities-AEC agreement State licensees...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Alabama, Arkansas, California, Kansas, Kentucky, Florida, Mississippi, New Hampshire, New York, North..., Florida, Mississippi, New Hampshire, New York, North Carolina, Texas, Tennessee, Oregon, Idaho, Arizona...

  4. 41 CFR 50-204.34 - AEC licensees-AEC contractors operating AEC plants and facilities-AEC agreement State licensees...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Alabama, Arkansas, California, Kansas, Kentucky, Florida, Mississippi, New Hampshire, New York, North..., Florida, Mississippi, New Hampshire, New York, North Carolina, Texas, Tennessee, Oregon, Idaho, Arizona...

  5. 48 CFR 1552.211-73 - Level of effort-cost-reimbursement term contract.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... programmers and not support personnel such as company management, typists, and key punch operators even though... specified in paragraph (a) includes Contractor, subcontractor, and consultant labor hours. (c) If the...

  6. Locations Accessible | Frederick National Laboratory for Cancer Research

    Cancer.gov

    The Frederick National Laboratory for Cancer Research campus is located 50 miles northwest of Washington, D.C., and 50 miles west of Baltimore, Maryland, in Frederick, Maryland.Operations and Technical Support contractor Leidos Biomedical Resea

  7. Design data brochure: SIMS prototype system 3

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A closed hydronic solar system is reported for space and hot water heating. Design, performance, and hardware specifications are presented sufficient for architectural engineers and contractors to procure, install, operate, and maintain a similar solar application.

  8. Pressure Safety Program Implementation at ORNL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lower, Mark; Etheridge, Tom; Oland, C. Barry

    2013-01-01

    The Oak Ridge National Laboratory (ORNL) is a US Department of Energy (DOE) facility that is managed by UT-Battelle, LLC. In February 2006, DOE promulgated worker safety and health regulations to govern contractor activities at DOE sites. These regulations, which are provided in 10 CFR 851, Worker Safety and Health Program, establish requirements for worker safety and health program that reduce or prevent occupational injuries, illnesses, and accidental losses by providing DOE contractors and their workers with safe and healthful workplaces at DOE sites. The regulations state that contractors must achieve compliance no later than May 25, 2007. According tomore » 10 CFR 851, Subpart C, Specific Program Requirements, contractors must have a structured approach to their worker safety and health programs that at a minimum includes provisions for pressure safety. In implementing the structured approach for pressure safety, contractors must establish safety policies and procedures to ensure that pressure systems are designed, fabricated, tested, inspected, maintained, repaired, and operated by trained, qualified personnel in accordance with applicable sound engineering principles. In addition, contractors must ensure that all pressure vessels, boilers, air receivers, and supporting piping systems conform to (1) applicable American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (2004) Sections I through XII, including applicable code cases; (2) applicable ASME B31 piping codes; and (3) the strictest applicable state and local codes. When national consensus codes are not applicable because of pressure range, vessel geometry, use of special materials, etc., contractors must implement measures to provide equivalent protection and ensure a level of safety greater than or equal to the level of protection afforded by the ASME or applicable state or local codes. This report documents the work performed to address legacy pressure vessel deficiencies and comply with pressure safety requirements in 10 CFR 851. It also describes actions taken to develop and implement ORNL’s Pressure Safety Program.« less

  9. Summary and evaluation of the parametric study of potential early commercial MHD power plants (PSPEC)

    NASA Technical Reports Server (NTRS)

    Staigner, P. J.; Abbott, J. M.

    1980-01-01

    Two parallel contracted studies were conducted. Each contractor investigated three base cases and parametric variations about these base cases. Each contractor concluded that two of the base cases (a plant using separate firing of an advanced high temperature regenerative air heater with fuel from an advanced coal gasifier and a plant using an intermediate temperature metallic recuperative heat exchanger to heat oxygen enriched combustion air) were comparable in both performance and cost of electricity. The contractors differed in the level of their cost estimates with the capital cost estimates for the MHD topping cycle and the magnet subsystem in particular accounting for a significant part of the difference. The impact of the study on the decision to pursue a course which leads to an oxygen enriched plant as the first commercial MHD plant is described.

  10. A Study of Persistent Elevated Pollution Episodes in the Northeastern United States.

    NASA Astrophysics Data System (ADS)

    Vaughan, William M.; Chan, Michael; Cantrell, Bruce; Pooler, Francis

    1982-03-01

    To examine chemical transformation within stagnant air masses and the atmospheric processes acting upon such air masses, the United States EPA sponsored a study in the summer of 1980 in the northeastern region of the country. Ten research aircraft and several mobile and stationary surface monitoring platforms from three EPA contractors, seven federal agencies, and four universities participated in an intensive measurement program between 16 July and 15 August 1980. Pollutants of interest included SO2, NO, NOx, HC, O3, sulfate, nitrate, and aerosols in general.This paper summarizes the activities of those research aircraft. The three aircraft and one helicopter operated by the contractor team logged a total of 353 flight hours during 100 missions in the program. Flights were made from Columbus. Ohio, to as far cast as Laconia, N.H., as Car south as Montgomery, Ala., as far west as Texarkana, Ark., and as far north as Saginaw, Mich. The flight patterns and data collected for each mission are documented. This summary will allow scientists who are interested in this data base to identify subsets of the data for model development.

  11. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  12. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  13. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  14. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  15. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  16. 28 CFR 115.332 - Volunteer and contractor training.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... contact with residents have been trained on their responsibilities under the agency's sexual abuse and sexual harassment prevention, detection, and response policies and procedures. (b) The level and type of training provided to volunteers and contractors shall be based on the services they provide and level of...

  17. 28 CFR 115.332 - Volunteer and contractor training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... contact with residents have been trained on their responsibilities under the agency's sexual abuse and sexual harassment prevention, detection, and response policies and procedures. (b) The level and type of training provided to volunteers and contractors shall be based on the services they provide and level of...

  18. 28 CFR 115.232 - Volunteer and contractor training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... contact with residents have been trained on their responsibilities under the agency's sexual abuse and sexual harassment prevention, detection, and response policies and procedures. (b) The level and type of training provided to volunteers and contractors shall be based on the services they provide and level of...

  19. 28 CFR 115.232 - Volunteer and contractor training.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... contact with residents have been trained on their responsibilities under the agency's sexual abuse and sexual harassment prevention, detection, and response policies and procedures. (b) The level and type of training provided to volunteers and contractors shall be based on the services they provide and level of...

  20. 28 CFR 115.332 - Volunteer and contractor training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... contact with residents have been trained on their responsibilities under the agency's sexual abuse and sexual harassment prevention, detection, and response policies and procedures. (b) The level and type of training provided to volunteers and contractors shall be based on the services they provide and level of...

  1. 28 CFR 115.232 - Volunteer and contractor training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... contact with residents have been trained on their responsibilities under the agency's sexual abuse and sexual harassment prevention, detection, and response policies and procedures. (b) The level and type of training provided to volunteers and contractors shall be based on the services they provide and level of...

  2. Civilian Contractors under Military Law

    DTIC Science & Technology

    2007-01-01

    MEJAhave Autumn 2007 87 dogged the USA Patriot Act, as well; there has only been one successful prose- cution of an Afghanistan- or Iraq-based...Baghdad Central Confinement Facility in Abu Ghraib. See “Abu Ghraib Contractor Sen- tenced for Child Porn ,” Associated Press, 25 May 2007, http

  3. Lunar surface mine feasibility study

    NASA Astrophysics Data System (ADS)

    Blair, Brad R.

    This paper describes a lunar surface mine, and demonstrates the economic feasibility of mining oxygen from the moon. The mine will be at the Apollo 16 landing site. Mine design issues include pit size and shape, excavation equipment, muck transport, and processing requirements. The final mine design will be driven by production requirements, and constrained by the lunar environment. This mining scenario assumes the presence of an operating lunar base. Lunar base personnel will set-up a and run the mine. The goal of producing lunar oxygen is to reduce dependence on fuel shipped from Earth. Thus, the lunar base is the customer for the finished product. The perspective of this paper is that of a mining contractor who must produce a specific product at a remote location, pay local labor, and sell the product to an onsite captive market. To make a profit, it must be less costly to build and ship specialized equipment to the site, and pay high labor and operating costs, than to export the product directly to the site.

  4. 10 CFR 800.001 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... such enterprises in participating fully in research, development, demonstration and contract activities...-tier subcontractors of DOE operating contractors in furtherance of the research, development... extent funds are provided in advance in appropriation acts. This regulation implements the authority for...

  5. 10 CFR 800.001 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... such enterprises in participating fully in research, development, demonstration and contract activities...-tier subcontractors of DOE operating contractors in furtherance of the research, development... extent funds are provided in advance in appropriation acts. This regulation implements the authority for...

  6. PERCHLORATE AS AN ENVIRONMENTAL CONTAMINANT

    EPA Science Inventory

    Perchlorate anion (C104) has been found in drinking water supplies throughout the southwestern United States. I t is primarily associated with releases of ammonium perdhlorate by defense contractors, military operations, and aerospace programs. Ammonium perchlorate is used as ...

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffith, Stacy Rene; Agogino, Karen; Li, Jun

    Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities managed and operated by Sandia Corporation (Sandia), a wholly owned subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Field Office (SFO), in Albuquerque, New Mexico, administers the contract and oversees contractor operations at TTR and KTF. Sandia manages and conducts operations at TTR in support of the DOE/NNSA’s Weapons Ordnance Program and has operated the site since 1957. Navarro Research and Engineering subcontracts to Sandia in administering most of the environmental programsmore » at TTR. Sandia operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report summarizes data and the compliance status of the sustainability, environmental protection, and monitoring program at TTR and KTF through Calendar Year 2013. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, Environmental Restoration (ER) cleanup activities, and the National Environmental Policy Act. Sandia is responsible only for those environmental program activities related to its operations. The DOE/NNSA/Nevada Field Office retains responsibility for the cleanup and management of TTR ER sites. Environmental monitoring and surveillance programs are required by DOE Order 231.1B, Environment, Safety, and Health Reporting (DOE 2012).« less

  8. KSC-2014-4211

    NASA Image and Video Library

    2014-10-07

    CAPE CANAVERAL, Fla. – Groundbreaking for the new Central Campus took place in the Industrial Area at NASA's Kennedy Space Center in Florida. Steve Belflower, vice president of HuntonBrady Architects of Orlando, speaks to members of the media and guests during the groundbreaking ceremony. Behind him is Nancy Bray, director of Kennedy's Center Operations Directorate. To his right is Kennedy Center Director Bob Cabana. To his left is Kirk Hazen, southeast district manager and vice president of Hensel Phelps, the construction contractor. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees. Photo credit: NASA/Kim Shiflett

  9. KSC-2014-4213

    NASA Image and Video Library

    2014-10-07

    CAPE CANAVERAL, Fla. – Groundbreaking for the new Central Campus took place in the Industrial Area at NASA's Kennedy Space Center in Florida. Digging in with shovels during the groundbreaking ceremony, are Dan Tweed, associate director for Facilities at Kennedy Steve Belflower, vice president of HuntonBrady Architects of Orlando Nancy Bray, director of Kennedy's Center Operations Directorate Kennedy Center Director Bob Cabana Kirk Hazen, southeast district manager and vice president of Hensel Phelps, the construction contractor and Kelvin Manning, Kennedy's associate director. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees. Photo credit: NASA/Kim Shiflett

  10. KSC-2014-4212

    NASA Image and Video Library

    2014-10-07

    CAPE CANAVERAL, Fla. – Groundbreaking for the new Central Campus took place in the Industrial Area at NASA's Kennedy Space Center in Florida. Digging in with shovels during the groundbreaking ceremony, are Dan Tweed, associate director for Facilities at Kennedy Steve Belflower, vice president of HuntonBrady Architects of Orlando Nancy Bray, director of Kennedy's Center Operations Directorate Kennedy Center Director Bob Cabana Kirk Hazen, southeast district manager and vice president of Hensel Phelps, the construction contractor and Kelvin Manning, Kennedy's associate director. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees. Photo credit: NASA/Kim Shiflett

  11. KSC-2014-4216

    NASA Image and Video Library

    2014-10-07

    CAPE CANAVERAL, Fla. – Groundbreaking for the new Central Campus took place in the Industrial Area at NASA's Kennedy Space Center in Florida. Kennedy Center Director Bob Cabana speaks to members of the media and guests during the groundbreaking ceremony. To his right is Nancy Bray, director of Kennedy's Center Operations Directorate. From far left, are Steve Belflower, vice president of HuntonBrady Architects of Orlando, and Kirk Hazen, southeast district manager and vice president of Hensel Phelps, the construction contractor. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees. Photo credit: NASA/Kim Shiflett

  12. KSC-2014-4210

    NASA Image and Video Library

    2014-10-07

    CAPE CANAVERAL, Fla. – Groundbreaking for the new Central Campus took place in the Industrial Area at NASA's Kennedy Space Center in Florida. Kirk Hazen, southeast district manager and vice president of Hensel Phelps, the construction contractor, speaks to members of the media and guests during the groundbreaking ceremony. Behind him is Nancy Bray, director of Kennedy's Center Operations Directorate. To his right is Kennedy Center Director Bob Cabana. To his left is Steve Belflower, vice president of HuntonBrady Architects of Orlando. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees. Photo credit: NASA/Kim Shiflett

  13. KSC-2014-4208

    NASA Image and Video Library

    2014-10-07

    CAPE CANAVERAL, Fla. – Groundbreaking for the new Central Campus took place in the Industrial Area at NASA's Kennedy Space Center in Florida. Nancy Bray, director of Kennedy's Center Operations Directorate, speaks to members of the media and guests during the ceremony. To her right is Kennedy Center Director Bob Cabana. From far left, are Steve Belflower, vice president of HuntonBrady Architects of Orlando, and Kirk Hazen, southeast district manager and vice president of Hensel Phelps, the construction contractor. Kennedy is transforming into a multi-user, 21st century spaceport supporting both commercial and government users and operations. Central Campus Phase I includes construction of a new Headquarters Building as one of the major components of the strategy. The new Headquarters Building will be a seven-story, 200,000-square-foot facility that will house about 500 NASA civil service and contractor employees. Photo credit: NASA/Kim Shiflett

  14. Nevada State plan; final approval determination. Occupational Safety and Health Administration (OSHA), U.S. Department of Labor. Final State plan approval--Nevada.

    PubMed

    2000-04-18

    This document amends OSHA's regulations to reflect the Assistant Secretary's decision granting final approval to the Nevada State plan. As a result of this affirmative determination under section 18(e) of the Occupational Safety and Health Act of 1970, Federal OSHA's standards and enforcement authority no longer apply to occupational safety and health issues covered by the Nevada plan, and authority for Federal concurrent jurisdiction is relinquished. Federal enforcement jurisdiction is retained over any private sector maritime employment, private sector employers on Indian land, and any contractors or subcontractors on any Federal establishment where the land is exclusive Federal jurisdiction. Federal jurisdiction remains in effect with respect to Federal government employers and employees. Federal OSHA will also retain authority for coverage of the United States Postal Service (USPS), including USPS employees, contract employees, and contractor-operated facilities engaged in USPS mail operations.

  15. Contractor cuts solar gain with custom window curtain

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ingraham, R.

    1985-04-22

    A local energy services contractor, using a 210-foot motorized thermal curtain to deflect sunlight entering the windows, has reduced excessive heat gain at a racetrack clubhouse here, cutting air conditioning run-time by about 75%. Because Mobile Greyhound Park's clubhouse faces east, direct exposure to sunlight from dawn to afternoon race time, about 1 p.m., was bringing the indoor temperature to almost 100/sup 0/, according to Stan Norris, operations management for the contracting firm, Technical Energy Controls, Inc. Lowering the temperature to a comfortable level required running four Carrier Corporation air handling units, rated at a total of more than 170more » tons, for about eight hours, and annual energy bills were running at about $240,000, Norris said. With the aluminum foil-backed vinyl curtain, the air handling units need only operate two hours to bring temperatures to comfort levels.« less

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barnes, Scott V.

    On August 1, 2014, Idaho National Laboratory (INL), in coordination with the State of Idaho, local jurisdictions, Department of Energy (DOE) Idaho Operations Office, and DOE Headquarters (DOE-HQ), conducted the annual emergency exercise to demonstrate the ability to implement the requirements of DOE O 151.1C, “Comprehensive Emergency Management System.” The INL contractor, Battelle Energy Alliance, LLC (BEA), in coordination with other INL contractors, conducted operations and demonstrated appropriate response measures to mitigate an event and protect the health and safety of personnel, the environment, and property. Offsite response organizations participated to demonstrate appropriate response measures. Report data were collected frommore » multiple sources, which included documentation generated during exercise response, player critiques conducted immediately after terminating the exercise, personnel observation sheets, and evaluation critiques. Evaluation of this exercise served as a management assessment of the performance of the INL Emergency Management Program (IAS141618).« less

  17. Legal Aspects: Civilians/Contractors in the War Zone And Disaster Relief Support Joint Center for Operational Analysis Journal, Volume 10, Issue 2, June 2008

    DTIC Science & Technology

    2008-06-01

    operations . The JSC, however, has analyzed the new legislation and their JCOA Journal, June 2008 13 recommendations for managing how these cases are...CBRNE) consequence management operations . 4 While the Department of Homeland Security’s (DHS) Federal Emergency Management Agency (FEMA) 5 is...affect the Department of Defense’s consequence management operations in support of a primary federal agency. Although the U.S. Constitution’s Supremacy

  18. 48 CFR 44.302 - Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... shall determine the need for a CPSR based on, but not limited to, the past performance of the contractor, and the volume, complexity and dollar value of subcontracts. If a contractor's sales to the Government... adjustment contracts and sales of commercial items pursuant to Part 12) are expected to exceed $25 million...

  19. 48 CFR 44.302 - Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... shall determine the need for a CPSR based on, but not limited to, the past performance of the contractor, and the volume, complexity and dollar value of subcontracts. If a contractor's sales to the Government... adjustment contracts and sales of commercial items pursuant to Part 12) are expected to exceed $25 million...

  20. 28 CFR 115.32 - Volunteer and contractor training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... inmates have been trained on their responsibilities under the agency's sexual abuse and sexual harassment... volunteers and contractors shall be based on the services they provide and level of contact they have with...'s zero-tolerance policy regarding sexual abuse and sexual harassment and informed how to report such...

  1. 28 CFR 115.32 - Volunteer and contractor training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... inmates have been trained on their responsibilities under the agency's sexual abuse and sexual harassment... volunteers and contractors shall be based on the services they provide and level of contact they have with...'s zero-tolerance policy regarding sexual abuse and sexual harassment and informed how to report such...

  2. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  3. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  4. 48 CFR 642.1503-70 - Contractor Performance System (CPS).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Performance System (CPS) maintained by the National Institutes of Health. CPS is an Internet-based tool... with access to the Internet shall use CPS to evaluate contractor's past performance for all contracts... the CPS; or (2) At overseas locations where access to the Internet is not practicable. (d) Heads of...

  5. Contractor Incentives for Success in Implementing Performance-Based Logistics: A Progress Report

    DTIC Science & Technology

    2010-04-30

    amount of risk; this, however, gives the contractor more latitude in determining and applying its methods ( KMC /OPI, 2010). The general consensus...Klevan, P. (2008, October 27). Navy success with PBL. Presentation at the DoD Maintenance Symposium. KMC /OPI. (2010, January 19). Acquisition

  6. 41 CFR 60-250.44 - Required contents of affirmative action programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... veterans. (8) The contractor, in making hiring decisions, should consider applicants who are known special... decisions are based only on valid job requirements. The policy shall state that employees and applicants... career days, youth motivation programs, and related activities in their communities. (6) The contractor...

  7. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false General. 915.404-4-71-1 Section 915.404-4-71-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND...) Reward contractors based on the complexity of work; (2) Reward contractors who demonstrate and establish...

  8. Assessing the sustainable construction of large construction companies in Malaysia

    NASA Astrophysics Data System (ADS)

    Adewale, Bamgbade Jibril; Mohammed, Kamaruddeen Ahmed; Nasrun, Mohd Nawi Mohd

    2016-08-01

    Considering the increasing concerns for the consideration of sustainability issues in construction project delivery within the construction industry, this paper assesses the extent of sustainable construction among Malaysian large contractors, in order to ascertain the level of the industry's impacts on both the environment and the society. Sustainable construction explains the construction industry's responsibility to efficiently utilise the finite resources while also reducing construction impacts on both humans and the environment throughout the phases of construction. This study used proportionate stratified random sampling to conduct a field study with a sample of 172 contractors out of the 708 administered questionnaires. Data were collected from large contractors in the eleven states of peninsular Malaysia. Using the five-level rating scale (which include: 1= Very Low; 2= Low; 3= Moderate; 4= High; 5= Very High) to describe the level of sustainable construction of Malaysian contractors based on previous studies, statistical analysis reveals that environmental, social and economic sustainability of Malaysian large contractors are high.

  9. The main factor affecting the competitiveness of Contractor Company

    NASA Astrophysics Data System (ADS)

    Nurisra; Malahayati, Nurul; Mahmuddin

    2018-05-01

    Contractor companies must have the competitive advantage to compete in maintaining the survival of the company. Problems arise because quite a lot of advantages can be used and these advantages must be used appropriately to produce competitiveness for the company to continue to compete and to win the competition. This study aims to determine the main factors affecting the competitiveness of medium-class contractors in Banda Aceh. Data collection was obtained through questionnaires distributed to 31 middle-class contractors in Banda Aceh. Data processing and analysis is done by using descriptive analysis. Based on the result of descriptive analysis, it can be concluded that the most important competitiveness factor with a mean score value 4.52 is the relationship, and the factor that has the highest mean score value is the relationship with the government of 4.97, while the result of the ranking analysis is obtained 25 factor that is critical to the competitiveness of medium-class contractors in Banda Aceh.

  10. 41 CFR 50-204.34 - AEC licensees-AEC contractors operating AEC plants and facilities-AEC agreement State licensees...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... material, or special nuclear material, as defined in the Atomic Energy Act of 1954, as amended, under a license issued by the Atomic Energy Commission and in accordance with the requirements of 10 CFR part 20... contract with the Atomic Energy Commission for the operation of AEC plants and facilities and in accordance...

  11. 41 CFR 50-204.34 - AEC licensees-AEC contractors operating AEC plants and facilities-AEC agreement State licensees...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... material, or special nuclear material, as defined in the Atomic Energy Act of 1954, as amended, under a license issued by the Atomic Energy Commission and in accordance with the requirements of 10 CFR part 20... contract with the Atomic Energy Commission for the operation of AEC plants and facilities and in accordance...

  12. A Comparison of Alternative Methods of Obtaining Defense Logistics Agency (DLA) Cognizance Spare Parts for Contractor Furnished Equipment (CFE) during Initial Outfitting of New Construction U.S. Navy Ships

    DTIC Science & Technology

    1991-12-01

    database, the Real Time Operation Management Information System (ROMIS), and Fitting Out Management Information System (FOMIS). These three configuration...Codes ROMIS Real Time Operation Management Information System SCLSIS Ship’s Configuration and Logistics Information System SCN Shipbuilding and

  13. 12 CFR 906.13 - How does the Finance Board oversee and monitor the outreach program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false How does the Finance Board oversee and monitor the outreach program? 906.13 Section 906.13 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOUSING FINANCE BOARD ORGANIZATION AND OPERATIONS OPERATIONS Contractor Outreach Program for Businesses Owned by Minorities, Women, or Individuals...

  14. Felling and skidding costs associated with thinning a commercial Appalachian hardwood stand in northern West Virginia

    Treesearch

    Samuel M. Brock; Kenneth D. Jones; Gary W. Miller

    1986-01-01

    Detailed cost information on thinning operations is needed to develop economic guidelines for managing immature central Appalachian hardwood stands. Three thinning treatments were applied in a 50-yr-old mixed-oak, cove hardwood stand in northern West Virginia. A commercial logging contractor using chain saws and a rubber-tired skidder conducted the logging operations....

  15. Site Environmental Report for 2010 Sandia National Laboratories, California.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, Barbara L.

    2011-06-01

    Sandia National Laboratories, California (SNL/CA) is a government-owned/contractor-operated laboratory. Sandia Corporation, a Lockheed Martin Company, manages and operates the laboratory for the Department of Energy's National Nuclear Security Administration (NNSA). The NNSA Sandia Site Office administers the contract and oversees contractor operations at the site. This Site Environmental Report for 2010 was prepared in accordance with DOE Order 231.1A (DOE 2004a). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2010. General site and environmental program information is also included. The Site Environmental Report is divided into ten chapters. Chaptermore » 1, the Executive Summary, highlights compliance and monitoring results obtained in 2010. Chapter 2 provides a brief introduction to SNL/CA and the existing environment found on site. Chapter 3 summarizes SNL/CA's compliance activities with the major environmental requirements applicable to site operations. Chapter 4 presents information on environmental management, performance measures, and environmental programs. Chapter 5 presents the results of monitoring and surveillance activities in 2010. Chapter 6 discusses quality assurance. Chapters 7 through 9 provide supporting information for the report and Chapter 10 is the report distribution list.« less

  16. Test, Control and Monitor System maintenance plan

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Lougheed, M. J.

    1993-01-01

    The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.

  17. The experiences of security industry contractors working in Iraq: an interpretative phenomenological analysis.

    PubMed

    Messenger, Katy; Farquharson, Lorna; Stallworthy, Pippa; Cawkill, Paul; Greenberg, Neil

    2012-07-01

    To explore the occupational experiences of private security contractors working in a war zone and how it impacts on their mental health. Semistructured interviews were conducted with seven contractors employed by a large UK-based private security company. Interpretative phenomenological analysis was used to analyze the interview transcripts. Participants also completed the 12-item General Health Questionnaire and the Posttraumatic Stress Disorder Checklist. Four overarching themes emerged: the appeal of the job; vulnerability; keep going; and seeking help for stress in the workplace. No clinically significant levels of distress were reported. Contractors are frequently exposed to stressors known to increase risk of psychiatric difficulty in military personnel. A number of potential protective factors were identified. Only a minority of participants were open to seeking help for mental health difficulties.

  18. Electrical, Electronic, and Electromechanical (EEE) parts management and control requirements for NASA space flight programs

    NASA Technical Reports Server (NTRS)

    1989-01-01

    This document establishes electrical, electronic, and electromechanical (EEE) parts management and control requirements for contractors providing and maintaining space flight and mission-essential or critical ground support equipment for NASA space flight programs. Although the text is worded 'the contractor shall,' the requirements are also to be used by NASA Headquarters and field installations for developing program/project parts management and control requirements for in-house and contracted efforts. This document places increased emphasis on parts programs to ensure that reliability and quality are considered through adequate consideration of the selection, control, and application of parts. It is the intent of this document to identify disciplines that can be implemented to obtain reliable parts which meet mission needs. The parts management and control requirements described in this document are to be selectively applied, based on equipment class and mission needs. Individual equipment needs should be evaluated to determine the extent to which each requirement should be implemented on a procurement. Utilization of this document does not preclude the usage of other documents. The entire process of developing and implementing requirements is referred to as 'tailoring' the program for a specific project. Some factors that should be considered in this tailoring process include program phase, equipment category and criticality, equipment complexity, and mission requirements. Parts management and control requirements advocated by this document directly support the concept of 'reliability by design' and are an integral part of system reliability and maintainability. Achieving the required availability and mission success objectives during operation depends on the attention given reliability and maintainability in the design phase. Consequently, it is intended that the requirements described in this document are consistent with those of NASA publications, 'Reliability Program Requirements for Aeronautical and Space System Contractors,' NHB 5300.4(1A-l); 'Maintainability Program Requirements for Space Systems,' NHB 5300.4(1E); and 'Quality Program Provisions for Aeronautical and Space System Contractors,' NHB 5300.4(1B).

  19. A strategic management model for evaluation of health, safety and environmental performance.

    PubMed

    Abbaspour, Majid; Toutounchian, Solmaz; Roayaei, Emad; Nassiri, Parvin

    2012-05-01

    Strategic health, safety, and environmental management system (HSE-MS) involves systematic and cooperative planning in each phase of the lifecycle of a project to ensure that interaction among the industry group, client, contractor, stakeholder, and host community exists with the highest level of health, safety, and environmental standard performances. Therefore, it seems necessary to assess the HSE-MS performance of contractor(s) by a comparative strategic management model with the aim of continuous improvement. The present Strategic Management Model (SMM) has been illustrated by a case study and the results show that the model is a suitable management tool for decision making in a contract environment, especially in oil and gas fields and based on accepted international standards within the framework of management deming cycle. To develop this model, a data bank has been created, which includes the statistical data calculated by converting the HSE performance qualitative data into quantitative values. Based on this fact, the structure of the model has been formed by defining HSE performance indicators according to the HSE-MS model. Therefore, 178 indicators have been selected which have been grouped into four attributes. Model output provides quantitative measures of HSE-MS performance as a percentage of an ideal level with maximum possible score for each attribute. Defining the strengths and weaknesses of the contractor(s) is another capability of this model. On the other hand, this model provides a ranking that could be used as the basis for decision making at the contractors' pre-qualification phase or during the execution of the project.

  20. Savannah River Site Environmental Report for 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arnett, M

    The mission at the Savannah River Site (SRS) is focused primarily on support of the national defense, nonproliferation, and environmental cleanup. SRS-through its prime operating contractor, Westinghouse Savannah River Company-continues to maintain a comprehensive environmental monitoring program.

Top