Sample records for base realignment contractor

  1. Office of Economic Adjustment | U.S. Department of Defense

    Science.gov Websites

    Reuse Compatible Use Defense Contractor Transitions Federal Assistance Coordination Mission Change contractor or manufacturer is making cuts or closing. Explore BRAC Icon Base Realignment and Closure A contact information. What We Do Base Closure Base Realignment Base Reuse Compatible Use Defense Contractor

  2. 77 FR 3503 - Guam Military Base Realignment Contractor Recruitment Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-24

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Notice... issuing this notice to announce the recruitment standards that construction contractors are required to... contractors engaged in construction projects related to the realignment of U.S. military forces from Okinawa...

  3. 77 FR 23755 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Guam...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ... for OMB Review; Comment Request; Guam Military Base Realignment Contractors Recruitment Standards... Administration (ETA) sponsored information collection request (ICR) titled, ``Guam Military Base Realignment... U.S. and other eligible workers for employment on Guam military base realignment construction...

  4. 78 FR 1256 - Guam Military Base Realignment Contractor Recruitment Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Final notice... issuing this notice to announce recruitment standards that construction contractors are required to follow... B) by adding a new subsection (6). This provision prohibits contractors engaged in construction...

  5. To amend the Public Works and Economic Development Act of 1965 to eliminate cost-sharing requirements in connection with economic adjustment grants made to assist communities that have suffered economic injury as a result of military base closures and realignments, defense contractor reductions in force, and Department of Energy defense-related funding reductions.

    THOMAS, 111th Congress

    Rep. Arcuri, Michael A. [D-NY-24

    2009-12-11

    House - 12/12/2009 Referred to the Subcommittee on Economic Development, Public Buildings and Emergency Management. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  6. FFRRO Program Information

    EPA Pesticide Factsheets

    This asset includes information related to Cleanups at Federal Facilities. Information is provided about contaminated federal facility sites in specific communities, with access to technical fact sheets and tools and resources to help government agencies and their contractors fulfill cleanup obligations. EPA's federal facility information is easily accessible to ensure effective stakeholder involvement and accountability at federal facilities.Multiple federal statutes establish requirements for EPA and other federal agencies to protect health and the human environment through cleanups at Federal Facilities, including the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980, which was amended by the Superfund Amendments and Reauthorization Act (SARA) in 1986; the Defense Authorization Amendments and Base Realignment and Closure Acts (BRAC) of 1998 and the Defense Base Closure and Realignment Act of 1990; and the Resource Conservation and Recovery Act (RCRA), as amended by the Hazardous and Solid Waste Amendments of 1984 (HS WA) including Subtitle C (hazardous waste), Subtitle D (solid waste), Subtitle I (underground storage tanks), and Subtitle J (Medical Waste Tracking Act of 1988).

  7. 32 CFR 989.25 - Base closure and realignment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Base closure and realignment. 989.25 Section 989... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.25 Base closure and realignment. Base closure or realignment may entail special requirements for environmental analysis. The permanent base closure...

  8. 32 CFR 989.25 - Base closure and realignment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Base closure and realignment. 989.25 Section 989... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.25 Base closure and realignment. Base closure or realignment may entail special requirements for environmental analysis. The permanent base closure...

  9. Military Base Realignments and Closures: Updated Costs and Savings Estimates from BRAC 2005

    DTIC Science & Technology

    2012-06-29

    AK 14.2 Realign medical functions at McChord Air Force Base, WA 13.7 Realign commodity management privatization 13.5 Close Kulis Air Guard...Realignment Act of 1990 by inserting a new section, § 2913, which established “military value” as the primary consideration for BRAC recommendations...Close Fort Monmouth, New Jersey ($1.1 billion increase). This recommendation closed Fort Monmouth and realigned various functions such as information

  10. 32 CFR 989.25 - Base closure and realignment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.25 Base closure and realignment. Base closure or realignment may entail special requirements for environmental analysis. The permanent base closure... frequently contain provisions limiting the extent of environmental analysis required for actions taken under...

  11. 32 CFR 989.25 - Base closure and realignment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.25 Base closure and realignment. Base closure or realignment may entail special requirements for environmental analysis. The permanent base closure... frequently contain provisions limiting the extent of environmental analysis required for actions taken under...

  12. Military Construction, Veterans Affairs, and Related Agencies: FY2009 Appropriations

    DTIC Science & Technology

    2008-07-07

    Posture Realignment ( GDPR ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 “Growing the Force...Supplemental (P.L. 110-252) . . . . . . . . . . . . . . . . . . . . 5 Table 3. IGPBS/ GDPR One-Time Implementation Costs...this report. Base Realignment and Closure (BRAC)/Integrated Global Presence and Basing Strategy (IGPBS)/Global Defense Posture Realignment ( GDPR ). Cost

  13. 2005 Base Closure and Realignment Commission Report

    EPA Pesticide Factsheets

    The 2005 Defense Base Closure and Realignment Commission is proud to present its Final Report for your consideration. As required by law, the Commission thoroughly and objectively reviewed the domestic installation closure and realignment recommendations proposed by the Secretary of Defense on May 13, 2005.

  14. 75 FR 60740 - Record of Decision for the Base Closure and Realignment Beddown and Flight Operations of Remotely...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... DEPARTMENT OF DEFENSE Department of the Air Force Record of Decision for the Base Closure and Realignment Beddown and Flight Operations of Remotely Piloted Aircraft at Grand Forks Air Force Base (AFB), ND... United States Air Force signed the ROD for the 2005 Base Closure and Realignment (BRAC 2005) directed...

  15. 75 FR 65463 - Record of Decision (ROD) for the Implementation of the Base Closure and Realignment (BRAC) 2005...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ... DEPARTMENT OF DEFENSE Department of the Army Record of Decision (ROD) for the Implementation of the Base Closure and Realignment (BRAC) 2005 Actions at Fort Monroe, VA AGENCY: Department of the Army... Defense Base Closure and Realignment Act of 1990 (the Base Closure Act), Public Law 101-510, as amended...

  16. Defense Base Realignment and Closure Budget Data for MCGuire Air Force Base, New Jersey

    DTIC Science & Technology

    1995-08-04

    The overall audit objective was to determine the accuracy of Defense base realignment and closure military construction budget data. This report provides the results of the audit of two projects, valued at $22.4 miilion, for the realignment of McGuire Air Force Base, New Jersey. The audit also assessed the adequacy of the management control program as it applied to the overall audit objective.

  17. Base Realignment and Closure (BRAC) Environmental Restoration Program Management Plan

    DTIC Science & Technology

    1999-04-01

    ENVIRONMENTAL PROGRAM 5 4.1 Environmental Restoration (Cleanup, Compliance and Unexploded Ordnance) 6 4.2 National Environmental Policy Act (NEPA...Realignment Act) to create a process to close bases and realign the force infrastructure. The law addressed National Environmental Policy Act (NEPA...primarily through provisions contained in the National Defense Authorization Acts for Fiscal Years 1992 through 1997. Appendix A of the BRAC Reuse

  18. Summary Report on the Audit of Defense Logistics Agency 1995 Defense Base Realignment and Closure Data Collection Process.

    DTIC Science & Technology

    1995-06-19

    VXW-ÄVAVKVX’AWXW/XVXV:*: OFFICE OF THE INSPECTOR GENERAL SUMMARY REPORT ON THE AUDIT OF DEFENSE LOGISTICS AGENCY 1995 DEFENSE BASE REALIGNMENT...FOR DIRECTOR, DEFENSE LOGISTICS AGENCY SUBJECT: Summary Report on the Audit of Defense Logistics Agency 1995 Defense Base Realignment and Closure...the data that DLA provides to support recommendations for the 1995 Commission. The specific objective for the audits was to determine whether the

  19. Generic Detection of Register Realignment

    NASA Astrophysics Data System (ADS)

    Ďurfina, Lukáš; Kolář, Dušan

    2011-09-01

    The register realignment is a method of binary obfuscation and it is used by malware writers. The paper introduces the method how register realignment can be recognized by analysis based on the scattered context grammars. Such an analysis includes exploration of bytes affected by realignment, finding new valid values for them, building the scattered context grammar and parse an obfuscated code by this grammar. The created grammar has LL property--an ability for parsing by this type of grammar.

  20. Generic Detection of Register Realignment

    NASA Astrophysics Data System (ADS)

    Durfina, Lukáš; Kolář, Dušan

    2011-09-01

    The register realignment is a method of binary obfuscation and it is used by malware writers. The paper introduces the method how register realignment can be recognized by analysis based on the scattered context grammars. Such an analysis includes exploration of bytes affected by realignment, finding new valid values for them, building the scattered context grammar and parse an obfuscated code by this grammar. The created grammar has LL property—an ability for parsing by this type of grammar.

  1. Summary Report on the Audit of Defense Base Closure and Realignment Budget Data for Fiscal Year 1992 and 1993

    DTIC Science & Technology

    1993-05-25

    OFFICE OF THE INSPECTOR GENERAL SUMMARY REPORT ON THE AUDIT OF DEFENSE BASE CLOSURE AND REALIGNMENT BUDGET DATA FOR FISCAL YEARS 1992 AND 1993...ASSISTANT SECRETARY OF DEFENSE (INSTALLATIONS) SUBJECT: Summary Report on the Audit of Defense Base Closure and Realignment Budget Data for Fiscal Years...1992 and 1993 (Report No. 93-100) We are providing this final summary report for your information and use. The audit was required by Public Law

  2. Summary Report on the Audit of Defense Base Closure and Realignment Budget Data for FYS 1993 and 1994

    DTIC Science & Technology

    1994-02-14

    Jl%«~~ /&■ OFFICE OF THE INSPECTOR GENERAL SUMMARY REPORT ON THE AUDIT OF DEFENSE BASE CLOSURE AND REALIGNMENT BUDGET DATA FOR FYS 1993 AND...COMPTROLLER) AUDITOR GENERAL, DEPARTMENT OF THE ARMY SUBJECT: Summary Report on the Audit of Defense Base Closure and Realignment Budget Data for FYs...Therefore, we are publishing this report in final form. We appreciate the courtesies and cooperation extended to the audit staff. If you have any

  3. 76 FR 70878 - Revitalizing Base Closure Communities and Addressing Impacts of Realignment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... base closure process to conform to the amendment to the Defense Base Closure and Realignment Act of... departments to expedite the EDC process. Closed military bases represent a potential engine of economic... purposes of establishing EDC terms and conditions. It also eliminates the need to establish a process by...

  4. Military Base Closures: Updated Status of Prior Base Realignments and Closures

    EPA Pesticide Factsheets

    As the Department of Defense (DOD) prepares for the 2005 base realignment and closure (BRAC) round, questions continue to be raised about the transfer and environmental cleanup of unneeded property arising from the prior four BRAC rounds and their impact on cost and savings and on local economies.

  5. Installation Management Command: How is the Command Supporting the Army Plan?

    DTIC Science & Technology

    2007-03-27

    BRAC), Global Defense Posture Realignment ( GDPR ), and Army Modular Force (AMF). IMCOM will continue to consolidate installations functions to free up...This restationing effort resides in three initiatives: Base Realignment and Closure (BRAC), Global Defense Posture Realignment ( GDPR ), and the Army...training on our installations.”36 The GDPR consolidates forces returning from overseas into selected CONUS installations. AMF has restructured the

  6. The impact of realignment on utilization and cost of community-based mental health services in California.

    PubMed

    Scheffler, R; Zhang, A; Snowden, L

    2001-11-01

    Decentralization of California's public mental health system under program realignment has changed the utilization and cost of community-based mental health services. This study examined a sample of 75,951 users, representing 1.5 million adults who visited California's public mental health services during a 6-year period (FY 1988-1990 and FY 1992-1994). Regression analysis was performed to examine cost and utilization reduction over time, across regions, and across psychiatric diagnoses. Overall utilization and cost of community-based mental health services dropped significantly after the implementation of realignment. They were significantly lower for (a) 24-hour services in the urban industrialized Southern Region and (b) outpatient services in the agricultural Central Region of the state. Users diagnosed with mood disorders took a greater portion, but were associated with significantly less treatment and cost than other users in the post-realignment period. When local communities bear the financial risks and rewards, they find more efficient methods of delivering community-based mental health services.

  7. Report on 2005 Defense Base Closure and Realignment Implementation

    DTIC Science & Technology

    2006-03-01

    ARNG RC Terrell ..................................................................................................... 561 ARNG RC Texarkana ...594 Walts-Guillot USARC, Texarkana ............................................................................ 595 Utah... Texarkana Commission recommendation number(s): 44 Recommendation title(s): RC Transformation in Texas Closure or realignment actions taken

  8. Military Bases: Opportunities Exist to Improve Future Base Realignment and Closure Rounds

    DTIC Science & Technology

    2013-03-01

    Operational Army—realigns Fort Bliss , TX; Fort Hood, TX; Fort Riley, KS; Fort Campbell, KY; and Fort Sill, OK to include rebasing of units from overseas to...Committee on Appropriations United States Senate The Honorable Tim Johnson Chairman The Honorable Mark Kirk Ranking Member Subcommittee on Military

  9. 75 FR 78946 - Revitalizing Base Closure Communities and Addressing Impacts of Realignment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... feasibility analysis describing the economic viability of the project, including an estimate of net proceeds.... SUMMARY: Economic Development Conveyances were created in amendments to the Base Closure and Realignment law in 1993, creating a new tool for communities experiencing economic dislocation from the closing of...

  10. 76 FR 20633 - Record of Decision (ROD) for the Base Closure and Realignment (BRAC) 2005 Actions at Fort...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... DEPARTMENT OF DEFENSE Department of the Army Record of Decision (ROD) for the Base Closure and... decision on how to implement property disposal in accordance with the Defense Base Closure and Realignment Act of 1990 (the Base Closure Act), Public Law 101-510, as amended, following the closure of Fort...

  11. Programmatic Environmental Assessment for Army 2020 Force Structure Realignment

    DTIC Science & Technology

    2013-01-01

    41 Realignment ( GDPR ) that evaluates U.S. force levels and requirements outside of the U.S. 42 Each of these initiatives is discussed in greater...configuration for the BCT. 9 1.3.3 Global Defense Posture Realignment 10 GDPR is another transformation process that will continue as the Army reduces its...while reducing funding requirements. The 19 decisions of GDPR will affect some of the future basing decisions made as part of Army 2020 20

  12. Military Construction, Veterans Affairs, and Related Agencies: FY2009 Appropriations

    DTIC Science & Technology

    2008-10-09

    Global Presence and Basing Strategy (IGPBS)/Global Defense Posture Realignment ( GDPR ) . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Repealing...Second FY2008 Supplemental (P.L. 110-252) . . . . . . . . . . . . . . . . . . . . 6 Table 3. IGPBS/ GDPR One-Time Implementation Costs...report. CRS-10 17 The DOD Integrated Global Presence and Basing Strategy (IGPBS) has been renamed the Global Defense Posture Realignment ( GDPR ). 18

  13. Military Base Realignments and Closures: DOD has Improved Environmental Cleanup Reporting but Should Obtain and Share More Information

    DTIC Science & Technology

    2017-01-01

    Defense (DOD) has captured and reported more comprehensive cost information in its environmental cost reporting for installations closed under the...Letter 1 Background 4 DOD’s Latest Report to Congress Captures More- Comprehensive Environmental Cleanup Cost Information, but Omits Emerging...22 Abbreviations BRAC Base Realignment and Closure CERCLA Comprehensive Environmental Response, Compensation, and

  14. Defense Base Realignment and Closure Budget Data for the Closure of Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-08-01

    provides the results of the audit of one project, valued at $2.75 million, for the closure and realignment of Fort Devens, Massachusetts. This audit also...assessed the adequacy of the management control program as it applied to the audit objective.

  15. Quick-Reaction Report on the Audit of Defense Base Realignment and Closure Budget Data for Naval Training Center Great Lakes, Illinois

    DTIC Science & Technology

    1994-05-19

    the audit of project P-608T, Building Modifications, as they relate to project P-557S. Because...project P-608T was addressed in Report No. 94-108, Quick-Reaction Report on the Audit of Defense Base Realignment and Closure Budget Data for Naval Station Treasure Island, California, May 19,

  16. Defense Base Closure and Realignment Commission

    DTIC Science & Technology

    1993-01-01

    during, their training . DLI required Only 803 houising units oii thle Army students inl thle human intelligence field Annex, the post cýxchiaige arid...community also stressed the Navy did not proposes significantly reduccd closure costs by know the true cost of relocating or replicating taking...Warfare Center- Carderock, Annapolis Detachment, The Annapolis community stressed in 1991 theDefense Base Closure and Realignment Coin- Annapolis

  17. The treatment of posterior urethral disruption associated with pelvic fractures: comparative experience of early realignment versus delayed urethroplasty.

    PubMed

    Mouraviev, Vladimir B; Coburn, Michael; Santucci, Richard A

    2005-03-01

    Urological treatment of the patient with severe mechanical trauma and urethral disruption remains controversial. Debate continues regarding the advisability of early realignment vs delayed open urethroplasty. We analyzed our experience with 96 patients to determine the long-term results of the 2 approaches. We retrospectively reviewed the records of 191 men with posterior urethral disruption after severe blunt pelvic injury between 1984 and 2001, of whom 96 survived. Data on 57 patients who underwent early realignment were compared to those on 39 treated with delayed urethroplasty with an average 8.8-year followup (range 1 to 22). All patients were evaluated postoperatively for incontinence, impotence and urethral strictures. The majority of patients had severe concomitant organ injuries (78%) and severe pelvic fractures (76%). The overall mortality rate was 51%. Diagnosis of urethral rupture was based on clinical findings and retrograde urethrography. Strictures developed in 49% of the early realignment group and in 100% of the suprapubic tube group. Impotence (33.6%) and incontinence (17.7%) were less frequent in the early realignment group than in the delayed reconstruction group (42.1% and 24.9%, respectively). Patients with delayed reconstruction underwent an average of 3.1 procedures compared with an average of 1.6 in the early realignment group. Early realignment may provide better outcomes than delayed open urethroplasty after posterior urethral disruption. Increased complications are not seen and, although it can be inconvenient in the massively injured patient, it appears to be a worthwhile maneuver.

  18. An 18-ps TDC using timing adjustment and bin realignment methods in a Cyclone-IV FPGA

    NASA Astrophysics Data System (ADS)

    Cao, Guiping; Xia, Haojie; Dong, Ning

    2018-05-01

    The method commonly used to produce a field-programmable gate array (FPGA)-based time-to-digital converter (TDC) creates a tapped delay line (TDL) for time interpolation to yield high time precision. We conduct timing adjustment and bin realignment to implement a TDC in the Altera Cyclone-IV FPGA. The former tunes the carry look-up table (LUT) cell delay by changing the LUT's function through low-level primitives according to timing analysis results, while the latter realigns bins according to the timing result obtained by timing adjustment so as to create a uniform TDL with bins of equivalent width. The differential nonlinearity and time resolution can be improved by realigning the bins. After calibration, the TDC has a 18 ps root-mean-square timing resolution and a 45 ps least-significant bit resolution.

  19. Final Base Realignment and Closure (BRAC) Environmental Assessment for Realignment of Nellis Air Force Base

    DTIC Science & Technology

    2007-03-01

    Traffic Control Assigned Airspace ATG Adversary Tactics Group AWACS Airborne Warning and Control System BAQ Bureau of Air Quality BLM Bureau of Land...Department of Interior Actions BLM The BLM manages millions of acres of public lands in southern Nevada which include portions of NTTR and...within NTTR and would not affect BLM lands adjacent to the base. Therefore, there are no cumulative impacts. USFWS Aircraft operate within the

  20. 2005 Defense Base Closure and Realignment Commission Report. Volume 1

    DTIC Science & Technology

    2005-01-01

    and Beale, and 15 A-10 aircraft realigned by the recommended closures of W.K. Kellogg Airport Air Guard Station, MI, and NAS Willow Grove, PA...functions of the Missile Defense Agency, except the Command and Control Battle Management and Communications Directorate, to Redstone Arsenal, AL... of other ships in the battle group. Systems are functionally integrated and not 287 separable as independent components. Furthermore, based on BRAC

  1. Comprehensive Base Realignment/Closure and Fort Belvoir Development

    DTIC Science & Technology

    1991-06-01

    Passerina cyanea rufous-sided towhee Pipilo erythrophthalmus American tree sparrow Spizella arborea chipping sparrow Spizella passerina field... sparrow Spizella pusilla vesper sparrow Pooecetes gramineus savanah sparrow Passerculus sandwichensis fox sparrow Passerella iliaca song sparrow Melospiza...and Realignment Commission the relocation of selected information Systems command elements from Fort Belvoir to Fort Ritchie or another

  2. Defense Base Realignment and Closure Budget Data for the Closure of Naval Training Center San Diego, California

    DTIC Science & Technology

    1995-06-06

    provides the audit results for 4 military construction projects, valued at $14.4 million, for realignment and closure of Naval Tralning Center San Diego...California. The audit also assessed the adequacy of the management control program as it applied to the audit objective.

  3. Outcomes of Endoscopic Realignment of Pelvic Fracture Associated Urethral Injuries at a Level 1 Trauma Center

    PubMed Central

    Leddy, Laura S.; Vanni, Alex J.; Wessells, Hunter; Voelzke, Bryan B.

    2012-01-01

    Purpose We examined the success of early endoscopic realignment of pelvic fracture associated urethral injury after blunt pelvic trauma. Materials and Methods A retrospective review was performed of patients with pelvic fracture associated urethral injury who underwent early endoscopic realignment using a retrograde or retrograde/antegrade approach from 2004 to 2010 at a Level 1 trauma center. Followup consisted of uroflowmetry, post-void residual and cystoscopic evaluation. Failure of early endoscopic realignment was defined as patients requiring urethral dilation, direct vision internal urethrotomy, posterior urethroplasty or self-catheterization after initial urethral catheter removal. Results A total of 19 consecutive patients (mean age 38 years) with blunt pelvic fracture associated urethral injury underwent early endoscopic realignment. Twelve cases of complete urethral disruption, 4 of incomplete disruption and 3 of indeterminate status were noted. Mean time to realignment was 2 days and mean duration of urethral catheterization after realignment was 53 days. One patient was lost to followup after early endoscopic realignment. Using an intent to treat analysis early endoscopic realignment failed in 15 of 19 patients (78.9%). Mean time to early endoscopic realignment failure after catheter removal was 79 days. The cases of early endoscopic realignment failure were managed with posterior urethroplasty (8), direct vision internal urethrotomy (3) and direct vision internal urethrotomy followed by posterior urethroplasty (3). Mean followup for the 4 patients considered to have undergone successful early endoscopic realignment was 2.1 years. Conclusions Early endoscopic realignment after blunt pelvic fracture associated urethral injury results in high rates of symptomatic urethral stricture requiring further operative treatment. Close followup after initial catheter removal is warranted, as the mean time to failure after early endoscopic realignment was 79 days in our cohort. PMID:22591965

  4. Realigning thunder and lightning: temporal adaptation to spatiotemporally distant events.

    PubMed

    Navarra, Jordi; Fernández-Prieto, Irune; Garcia-Morera, Joel

    2013-01-01

    The brain is able to realign asynchronous signals that approximately coincide in both space and time. Given that many experience-based links between visual and auditory stimuli are established in the absence of spatiotemporal proximity, we investigated whether or not temporal realignment arises in these conditions. Participants received a 3-min exposure to visual and auditory stimuli that were separated by 706 ms and appeared either from the same (Experiment 1) or from different spatial positions (Experiment 2). A simultaneity judgment task (SJ) was administered right afterwards. Temporal realignment between vision and audition was observed, in both Experiment 1 and 2, when comparing the participants' SJs after this exposure phase with those obtained after a baseline exposure to audiovisual synchrony. However, this effect was present only when the visual stimuli preceded the auditory stimuli during the exposure to asynchrony. A similar pattern of results (temporal realignment after exposure to visual-leading asynchrony but not after exposure to auditory-leading asynchrony) was obtained using temporal order judgments (TOJs) instead of SJs (Experiment 3). Taken together, these results suggest that temporal recalibration still occurs for visual and auditory stimuli that fall clearly outside the so-called temporal window for multisensory integration and appear from different spatial positions. This temporal realignment may be modulated by long-term experience with the kind of asynchrony (vision-leading) that we most frequently encounter in the outside world (e.g., while perceiving distant events).

  5. Military Base Realignments and Closures: More Guidance and Information Needed to Take Advantage of Opportunities to Consolidate Training

    DTIC Science & Technology

    2016-02-01

    Management Training, (2) Joint Center of Excellence for Culinary Training, (3) Joint Center of Excellence for Religious Training and Education, (4...of Excellence for Culinary Training (#123) Realign Lackland Air Force Base, Texas by relocating Culinary Training to Fort Lee, Virginia...establishing it as a Joint Center of Excellence for Culinary Training. Fort Lee, Virginia Army, Air Force, Navy, Marine Corps Joint Center of Excellence

  6. 32 CFR 174.15 - Indemnification under Section 330 of the National Defense Authorization Act for Fiscal Year 1993.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Indemnification under Section 330 of the National Defense Authorization Act for Fiscal Year 1993. 174.15 Section 174.15 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE CLOSURES AND REALIGNMENT REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT...

  7. 32 CFR 174.15 - Indemnification under Section 330 of the National Defense Authorization Act for Fiscal Year 1993.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false Indemnification under Section 330 of the National Defense Authorization Act for Fiscal Year 1993. 174.15 Section 174.15 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE CLOSURES AND REALIGNMENT REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT...

  8. 32 CFR 174.15 - Indemnification under Section 330 of the National Defense Authorization Act for Fiscal Year 1993.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false Indemnification under Section 330 of the National Defense Authorization Act for Fiscal Year 1993. 174.15 Section 174.15 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE CLOSURES AND REALIGNMENT REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT...

  9. 32 CFR 174.15 - Indemnification under Section 330 of the National Defense Authorization Act for Fiscal Year 1993.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 1 2014-07-01 2014-07-01 false Indemnification under Section 330 of the National Defense Authorization Act for Fiscal Year 1993. 174.15 Section 174.15 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE CLOSURES AND REALIGNMENT REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT...

  10. 32 CFR 174.15 - Indemnification under Section 330 of the National Defense Authorization Act for Fiscal Year 1993.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false Indemnification under Section 330 of the National Defense Authorization Act for Fiscal Year 1993. 174.15 Section 174.15 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE CLOSURES AND REALIGNMENT REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT...

  11. Marshall Application Realignment System (MARS) Architecture

    NASA Technical Reports Server (NTRS)

    Belshe, Andrea; Sutton, Mandy

    2010-01-01

    The Marshall Application Realignment System (MARS) Architecture project was established to meet the certification requirements of the Department of Defense Architecture Framework (DoDAF) V2.0 Federal Enterprise Architecture Certification (FEAC) Institute program and to provide added value to the Marshall Space Flight Center (MSFC) Application Portfolio Management process. The MARS Architecture aims to: (1) address the NASA MSFC Chief Information Officer (CIO) strategic initiative to improve Application Portfolio Management (APM) by optimizing investments and improving portfolio performance, and (2) develop a decision-aiding capability by which applications registered within the MSFC application portfolio can be analyzed and considered for retirement or decommission. The MARS Architecture describes a to-be target capability that supports application portfolio analysis against scoring measures (based on value) and overall portfolio performance objectives (based on enterprise needs and policies). This scoring and decision-aiding capability supports the process by which MSFC application investments are realigned or retired from the application portfolio. The MARS Architecture is a multi-phase effort to: (1) conduct strategic architecture planning and knowledge development based on the DoDAF V2.0 six-step methodology, (2) describe one architecture through multiple viewpoints, (3) conduct portfolio analyses based on a defined operational concept, and (4) enable a new capability to support the MSFC enterprise IT management mission, vision, and goals. This report documents Phase 1 (Strategy and Design), which includes discovery, planning, and development of initial architecture viewpoints. Phase 2 will move forward the process of building the architecture, widening the scope to include application realignment (in addition to application retirement), and validating the underlying architecture logic before moving into Phase 3. The MARS Architecture key stakeholders are most interested in Phase 3 because this is where the data analysis, scoring, and recommendation capability is realized. Stakeholders want to see the benefits derived from reducing the steady-state application base and identify opportunities for portfolio performance improvement and application realignment.

  12. Base Realignment and Closure: An Evolution for Harvesting Efficiencies

    DTIC Science & Technology

    2012-06-15

    Master’s Thesis 3. DATES COVERED (From - To) 25-07-2011 to 15-06-2012 4. TITLE AND SUBTITLE Base Realignment and Closure: An Evolution for...made to c lo~e and rea l ign bases in a timely manner. ACKNOWLEDGEl\\IIENT Although one name appears on the cover of thi.s thesi ~. thi~ paper i the...wisdom to endure to the end. • M y fami ly ror your constcu1t encourugcment and support . • C’ A PT Joanne Fish. my thesi ~ advi!’>ur who provided the

  13. Realigning Thunder and Lightning: Temporal Adaptation to Spatiotemporally Distant Events

    PubMed Central

    Navarra, Jordi; Fernández-Prieto, Irune; Garcia-Morera, Joel

    2013-01-01

    The brain is able to realign asynchronous signals that approximately coincide in both space and time. Given that many experience-based links between visual and auditory stimuli are established in the absence of spatiotemporal proximity, we investigated whether or not temporal realignment arises in these conditions. Participants received a 3-min exposure to visual and auditory stimuli that were separated by 706 ms and appeared either from the same (Experiment 1) or from different spatial positions (Experiment 2). A simultaneity judgment task (SJ) was administered right afterwards. Temporal realignment between vision and audition was observed, in both Experiment 1 and 2, when comparing the participants’ SJs after this exposure phase with those obtained after a baseline exposure to audiovisual synchrony. However, this effect was present only when the visual stimuli preceded the auditory stimuli during the exposure to asynchrony. A similar pattern of results (temporal realignment after exposure to visual-leading asynchrony but not after exposure to auditory-leading asynchrony) was obtained using temporal order judgments (TOJs) instead of SJs (Experiment 3). Taken together, these results suggest that temporal recalibration still occurs for visual and auditory stimuli that fall clearly outside the so-called temporal window for multisensory integration and appear from different spatial positions. This temporal realignment may be modulated by long-term experience with the kind of asynchrony (vision-leading) that we most frequently encounter in the outside world (e.g., while perceiving distant events). PMID:24391928

  14. Defense Base Realignment and Closure Budget Data for Naval Air Technical Training Center, Naval Air Station Pensacola, Florida

    DTIC Science & Technology

    1994-06-07

    023- S -94 Military Construction Projects Budgeted January 14, 1994 and Programmed for Bases Identified for Closure or Realignment 028-C-93...deferred to this analysis as the more accurate basis for design and construction costs, rather than the gross estimates in the 1391’ s submitted much...solutions( s ), it is imperative that design and construction costs, operation/maintenance costs, the specific health care needs of the population to

  15. A Parametric Regression of the Cost of Base Realignment Action (COBRA) Model

    DTIC Science & Technology

    1993-09-20

    Douglas D. Hardman , Captain, USAF Michael S. Nelson, Captain, USAF AFIT/GEE/ENS/93S-03 93 P’ 8 143 Approved for public release, distribution unlimited 93... Hardman CLASS: GEE 93S Captain Michael Nelson TITLE: A Parametric Regression of the Cost of Base Realignment Action (COBRA) Model DEFENSE DATE: 20...Science in Engineering and Environmental Management Douglas D. Hardman , B.S.E.E. Michael S. Nelson, B.S.C.E Captain, USAF Captain, USAF September 1993

  16. Quick-Reaction Report on the Audit of Defense Base Realignment and Closure Budget Data for Naval Station Treasure Island, California

    DTIC Science & Technology

    1994-05-19

    the audit of two projects: P-608T, Building Modifications, valued at...Island, California, to the Naval Training Center Great Lakes, Illinois. The audit also evaluated the implementation of the DoD Internal Management...related to the two projects in this report and is discussed in Report No. 94-109, Quick-Reaction Report on the Audit of Defense Base Realignment and Closure Budget Data for the Naval Training Center Great Lakes, Illinois, May 19,

  17. Tier One: Draft Environmental Impact Statement. Volume 2. Realignment of Mountain Home Air Force Base and Proposed Expanded Range Capability

    DTIC Science & Technology

    1990-02-01

    in section S3.1, Airspace Management. oue ORNL 1988 data. S3.10-2 S3.10.4 Community Services Community services provided at the county level include...Under the Base Realignment Project. Mountain Home City Clerk’s Office. 1989. Proposed Fiscal 1990 Budget. Oak Ridge National Laboratory ( ORNL ). 1988. Low...Altitude Airspace Database. Submitted to the U.S. Air Force. ORNL and Consultants. 1988. Reviews of Scientific Literatures on the Environmental

  18. Multisensor/multimission surveillance aircraft

    NASA Astrophysics Data System (ADS)

    Jobe, John T.

    1994-10-01

    The realignment of international powers, and the formation of new nations has resulted in increasing worldwide concern over border security, an expanding refugee problem, protection of fishery and mineral areas, and smuggling of all types. The focus on military services, to protect or defend against these threats of vital, national interest, is shifting to other government agencies and even commercial contractors to apply innovative and cost effective solutions. Previously, airborne surveillance and reconnaissance platforms have been large, mission dedicated military aircraft. The time has arrived for a smaller, more efficient, and more effective airborne capability. This paper briefly outlines a system of systems approach that smaller nations can afford to incorporate in their budgets, while greatly expanding their surveillance capability. The characteristics of specific cameras and sensors are purposely not addressed, so the emphasis can be placed on the integration of multiple sensors and capabilities.

  19. The Installation Funding Dilemma

    DTIC Science & Technology

    2008-04-04

    role in supporting the Army’s plans for supporting base realignment and closure (BRAC) requirements, global defense posture realignment ( GDPR ...relation to their affect on installation management funding. First, the initiative known as the GDPR will return many units to the United States from...three initiatives ( GDPR , BRAC and Modularity) and certain other restationing moves, the Army expects a net gain of about 154,000 personnel at its domestic

  20. Audit Report. Quick-Reaction Report on the Review of Defense Base Closure and Realignment Budget Data for Carswell, Barksdale, Dyess, Minot, and Tinker Air Force Bases

    DTIC Science & Technology

    1992-11-27

    for 10 construction pr~n’jcts for realigning Carswell AFB was not adeauately documented as required by Air Force Regulation (AFR) 86-1, " Programming ...Engineering Programming , Standard Facility Requirements." paragraph 24-70, allows for a total of 25,200 square feet of space for tne warehouse and...cantonment area, and replaced an existing capability. The fact that a replacement wash rack was previously programmed does not alter this requirement

  1. Environmental Impact Statement. Preliminary Draft. Realignment of Cannon Air Force Base, Curry County, New Mexico

    DTIC Science & Technology

    1989-12-15

    creation of the Mount Dora Military Operations Area are proposed actions associated with the realignment. Contact for Further Information: Captain...2.2.5 Establishment of the Mount Dora MOA ................. 2-1532.2.6 Pecos MOA Use ................................. 2-21 2.3 THE NO-ACTION...2-22 2.3.3 Establishment of the Mount Dora MOA ................. 2-22 2.3.4 Pecos MOA Use ................................. 2-2532.4

  2. Environmental Assessment: Base Realignment and Closure (BRAC) 2005 Mission Realignments to Vandenberg AFB

    DTIC Science & Technology

    2007-02-01

    Utilities (3.11), and Health and Safety (3.12). The following areas of environmental consequences evaluated in the EA were determined to have the... Safety requires a walk- through survey prior to construction. Prior to the commencement of construction activities on the electrical substation site...an unexploded ordnance survey shall be conducted by 30th Space Wing Safety . Should any unexploded ordnances be identified as a result of the survey

  3. Community Environmental Response Facilitation Act (CERFA) report, Fort Holabird Crime Records Center, Baltimore, Maryland

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Public Laws designated more than 100 Department of Army facilities for closure and realignment. As a result, it became necessary to expedite the environmental investigation and cleanup process, as necessary, prior to the release and reuse of Army Base Realignment and Closure (BRAC) property. The BRAC environmental restoration program was established in 1989 with the first round (BRAC 88) of base closures and continued with subsequent rounds (BRAC 91, BRAC 93, etc.). As a result of the BRAC program, Fort Holabird Crime Records Center has been investigated to determine its environmental condition.

  4. Defense Base Realignment and Closure Budget Data for Closing Naval Station Charleston, South Carolina, and Realigning Projects at Various Sites

    DTIC Science & Technology

    1995-03-15

    Charleston, SC Naval Submarine Base Kings Bay, GA Naval Weapons Station Charleston, SC Naval Reserve Force, New Orleans, LA Naval Reserve Readiness...2.0X3.2 2.0X3.0 Chut cabin« 2 2.0X5.0 2.0X5.0 Chair 2 2.6X2.8 2.6X3.0 CoSae -IaM« 1 2.2X4.0...working space for the Administrative Diviiion Officer. Correspondence Supervisor. Correspondence desk, Word Processin» de *. TAD/ Security Clerk, and

  5. Influence of rheology on realignment of mantle convective structure with plate motion after a plate reorganization

    NASA Astrophysics Data System (ADS)

    van Hunen, J.; Zhong, S.

    2006-08-01

    Small-scale convection (SSC) rolls below the oceanic lithosphere have the tendency to align with the large-scale shearing direction and thus with the plate motion direction relative to the deep mantle. Understanding the timescales of and processes responsible for realignment would contribute significantly to our understanding of the unresolved phenomena in the Pacific such as gravity lineations, small-scale seismic velocity variations, and intraplate volcanism that cannot be explained by hot spots. In this study we examine the evolution of those convection rolls when this relative plate motion direction is suddenly changed, as suggested by the kink in the Hawaii-Emperor seamount chain. Using three-dimensional numerical flow models, we investigate the realignment of SSC rolls after a change in plate motion direction. From the nature of the SSC, it is expected that rheological parameters dominate the characteristics of this realignment. Our results show that this is indeed the case. We find that (1) using constraints from onset timing of SSC, realignment of rolls can occur as fast as within 20 Ma, but might also take much longer, dependent on the rheology; (2) the realignment period is strongly correlated to the sum of large-scale shear stress induced by plate motion and small-scale shear stress from the SSC itself; (3) in a mantle deforming by dislocation creep, realignment occurs faster than by diffusion creep, because dislocation creep SSC is more vigorous; and (4) activation energy has little influence on the realignment time. Possible evidence for the realignment period might come from precise age determination of intraplate volcanism or azimuthal seismic anisotropy.

  6. Report on 2005 Defense Base Closure and Realignment Implementation

    DTIC Science & Technology

    2007-04-01

    Marcos 559 ARNG RC Seguin 560 ARNG RC Snyder 561 ARNG RC Taylor 562 ARNG RC Terrell 563 ARNG RC Texarkana 564 ARNG RC Tyler 565 Benavidez USARC, El...realignment actions: Sep 1 2011 563 ARNG RC Texarkana , TX Commission recommendation(s) affected by this installation: Number Title 44 Reserve Component...AL421382002700 State: Alabama Sites Sites RC Total 51 38 Phase Beg. End <=2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

  7. 78 FR 21919 - Finding of No Significant Impact and Final Programmatic Environmental Assessment for Army 2020...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... Programmatic Environmental Assessment for Army 2020 Force Structure Realignment AGENCY: Department of the Army... of the Finding of No Significant Impact (FNSI) for implementation of force structure realignment to... Structure Realignment (PEA), supporting studies, and comments received during the public review period, the...

  8. Introducing an on-line adaptive procedure for prostate image guided intensity modulate proton therapy.

    PubMed

    Zhang, M; Westerly, D C; Mackie, T R

    2011-08-07

    With on-line image guidance (IG), prostate shifts relative to the bony anatomy can be corrected by realigning the patient with respect to the treatment fields. In image guided intensity modulated proton therapy (IG-IMPT), because the proton range is more sensitive to the material it travels through, the realignment may introduce large dose variations. This effect is studied in this work and an on-line adaptive procedure is proposed to restore the planned dose to the target. A 2D anthropomorphic phantom was constructed from a real prostate patient's CT image. Two-field laterally opposing spot 3D-modulation and 24-field full arc distal edge tracking (DET) plans were generated with a prescription of 70 Gy to the planning target volume. For the simulated delivery, we considered two types of procedures: the non-adaptive procedure and the on-line adaptive procedure. In the non-adaptive procedure, only patient realignment to match the prostate location in the planning CT was performed. In the on-line adaptive procedure, on top of the patient realignment, the kinetic energy for each individual proton pencil beam was re-determined from the on-line CT image acquired after the realignment and subsequently used for delivery. Dose distributions were re-calculated for individual fractions for different plans and different delivery procedures. The results show, without adaptive, that both the 3D-modulation and the DET plans experienced delivered dose degradation by having large cold or hot spots in the prostate. The DET plan had worse dose degradation than the 3D-modulation plan. The adaptive procedure effectively restored the planned dose distribution in the DET plan, with delivered prostate D(98%), D(50%) and D(2%) values less than 1% from the prescription. In the 3D-modulation plan, in certain cases the adaptive procedure was not effective to reduce the delivered dose degradation and yield similar results as the non-adaptive procedure. In conclusion, based on this 2D phantom study, by updating the proton pencil beam energy from the on-line image after realignment, this on-line adaptive procedure is necessary and effective for the DET-based IG-IMPT. Without dose re-calculation and re-optimization, it could be easily incorporated into the clinical workflow.

  9. Introducing an on-line adaptive procedure for prostate image guided intensity modulate proton therapy

    NASA Astrophysics Data System (ADS)

    Zhang, M.; Westerly, D. C.; Mackie, T. R.

    2011-08-01

    With on-line image guidance (IG), prostate shifts relative to the bony anatomy can be corrected by realigning the patient with respect to the treatment fields. In image guided intensity modulated proton therapy (IG-IMPT), because the proton range is more sensitive to the material it travels through, the realignment may introduce large dose variations. This effect is studied in this work and an on-line adaptive procedure is proposed to restore the planned dose to the target. A 2D anthropomorphic phantom was constructed from a real prostate patient's CT image. Two-field laterally opposing spot 3D-modulation and 24-field full arc distal edge tracking (DET) plans were generated with a prescription of 70 Gy to the planning target volume. For the simulated delivery, we considered two types of procedures: the non-adaptive procedure and the on-line adaptive procedure. In the non-adaptive procedure, only patient realignment to match the prostate location in the planning CT was performed. In the on-line adaptive procedure, on top of the patient realignment, the kinetic energy for each individual proton pencil beam was re-determined from the on-line CT image acquired after the realignment and subsequently used for delivery. Dose distributions were re-calculated for individual fractions for different plans and different delivery procedures. The results show, without adaptive, that both the 3D-modulation and the DET plans experienced delivered dose degradation by having large cold or hot spots in the prostate. The DET plan had worse dose degradation than the 3D-modulation plan. The adaptive procedure effectively restored the planned dose distribution in the DET plan, with delivered prostate D98%, D50% and D2% values less than 1% from the prescription. In the 3D-modulation plan, in certain cases the adaptive procedure was not effective to reduce the delivered dose degradation and yield similar results as the non-adaptive procedure. In conclusion, based on this 2D phantom study, by updating the proton pencil beam energy from the on-line image after realignment, this on-line adaptive procedure is necessary and effective for the DET-based IG-IMPT. Without dose re-calculation and re-optimization, it could be easily incorporated into the clinical workflow.

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guadarrama, D.S.

    The final round of the Base Realignment and Closure Commission (BRAC) included Kelly AFB, Texas, one of the largest military industrial depots in the United States, to be realigned/closed. The successful realignment and closure of this depot relies heavily on meeting the environmental challenges faced by the Air Force and the Local Reuse Authority (LRA). From the onset, the Department of Defense (DoD) and the Air Force were aware this effort was not common to any prior BRAC recommended closures. Privatization-in-Place (PIP) was an option offered to Kelly AFB by the President to lessen the severity of economic loss tomore » the community. The President also directed the acceleration of environmental cleanup at BRAC bases where the Environmental Management (EM) Directorate at Kelly has aggressively met and continues to meet the mission requirements while also serving the LRA and the Air Force Base Conversion Agency (AFBCA) meet the BRAC directives at Air Force installations. The privatization momentum has also generated a myriad of requests for environmental information from companies interested in relocating to Kelly AFB. To achieve a successful transition, EM must maintain awareness on issues in and outside the environmental arena. The paper will offer information on Kelly`s pro-active approach maintained by the EM staff as they serve in the forefront of the closure/realignment mission. A discussion of the aggressive community outreach efforts to assist the local community understand the BRAC process and the impact on the restoration and compliance activities will be provided. They also orchestrated an Environmental Industry Day whereby hundreds of environmental representatives observed the industrial processes at Kelly and successful programs while achieving compliance with environmental regulations.« less

  11. Automated Long-Term Monitoring of Parallel Microfluidic Operations Applying a Machine Vision-Assisted Positioning Method

    PubMed Central

    Yip, Hon Ming; Li, John C. S.; Cui, Xin; Gao, Qiannan; Leung, Chi Chiu

    2014-01-01

    As microfluidics has been applied extensively in many cell and biochemical applications, monitoring the related processes is an important requirement. In this work, we design and fabricate a high-throughput microfluidic device which contains 32 microchambers to perform automated parallel microfluidic operations and monitoring on an automated stage of a microscope. Images are captured at multiple spots on the device during the operations for monitoring samples in microchambers in parallel; yet the device positions may vary at different time points throughout operations as the device moves back and forth on a motorized microscopic stage. Here, we report an image-based positioning strategy to realign the chamber position before every recording of microscopic image. We fabricate alignment marks at defined locations next to the chambers in the microfluidic device as reference positions. We also develop image processing algorithms to recognize the chamber positions in real-time, followed by realigning the chambers to their preset positions in the captured images. We perform experiments to validate and characterize the device functionality and the automated realignment operation. Together, this microfluidic realignment strategy can be a platform technology to achieve precise positioning of multiple chambers for general microfluidic applications requiring long-term parallel monitoring of cell and biochemical activities. PMID:25133248

  12. Modelling the effects and economics of managed realignment on the cycling and storage of nutrients, carbon and sediments in the Blackwater estuary UK

    NASA Astrophysics Data System (ADS)

    Shepherd, D.; Burgess, D.; Jickells, T.; Andrews, J.; Cave, R.; Turner, R. K.; Aldridge, J.; Parker, E. R.; Young, E.

    2007-07-01

    A hydrodynamic model is developed for the Blackwater estuary (UK) and used to estimate nitrate removal by denitrification. Using the model, sediment analysis and estimates of sedimentation rates, we estimate changes in estuarine denitrification and intertidal carbon and nutrient storage and associated value of habitat created under a scenario of extensive managed realignment. We then use this information, together with engineering and land costs, to conduct a cost benefit analysis of the managed realignment. This demonstrates that over a 50-100 year timescale the value of the habitat created and carbon buried is sufficient to make the large scale managed realignment cost effective. The analysis reveals that carbon and nutrient storage plus habitat creation represent major and quantifiable benefits of realignment. The methodology described here can be readily transferred to other coastal systems.

  13. Atlantoaxial manual realignment in a patient with traumatic atlantoaxial joint disruption.

    PubMed

    Goel, Atul; Figueiredo, Antonio; Maheshwari, Shradha; Shah, Abhidha

    2010-05-01

    We report a patient with complex traumatic translatory atlantoaxial dislocation, who we treated by joint exposure and reduction of the dislocation by facet manipulation and subsequent plate and screw atlantoaxial fixation. A 28-year-old male had fallen 7.6m (25 feet), and following the fall had severe neck pain but no neurological deficit. Investigations revealed a fracture at the base of the odontoid process and posterior displacement of the entire atlas over the axis, resulting in a translatory atlantoaxial dislocation. Head traction failed as he developed severe vertigo following its application. The patient was operated upon in a prone position. We opened the atlantoaxial joint and realigned the facets using distraction and manipulation techniques and secured the joint using a plate and screw interarticular method. The patient tolerated the treatment well and was symptom-free after 28 months. Postoperative images showed good craniovertebral alignment. Although technically challenging, direct manipulation of the facets of the atlas and axis can result in excellent craniovertebral realignment.

  14. Contractor evaluations in the contractor selection process.

    DOT National Transportation Integrated Search

    2014-04-01

    The current contractor evaluation system in use within the Kentucky Transportation Cabinet is based on the contractor evaluation system developed as part of SPR 212-00 "Quality Based Prequalification of Contractors." This system relies on average per...

  15. Modified Primary Urethral Realignment Under Flexible Urethroscope.

    PubMed

    Huang, Guanglin; Man, Libo; Li, Guizhong; Wang, Hai; Liu, Ning

    2017-02-01

    To assess the clinical significance of flexible endoscopic realignment in the treatment of posterior urethral disruption in comparison to the traditional open realignment method. A total of 58 patients suffering posterior urethral disruption were enrolled into the current study from January 2003 to May 2009. Of them, 23 patients (Group A) were treated with modified technique of urethral realignment under flexible urethroscopy and 35 patients (Group B) received conventional open realignment. Either procedure was successfully performed in both groups. However, the operation time was significantly shorter in Group A (29.1 ± 9.5 min) than that in Group B (58.1 ± 11.2 min, p < 0.001). Also, patients in Group A had a significantly decreased incidence of stricture (4 of 23 cases in Group A versus 15 of 35 cases in Group B, p = 0.043) and formation of false urethra (0 of 23 cases in Group A versus 7 of 35 cases in Group B, p = 0.035). Prevalence of secondary urethroplasty was less in Group A (1/23) compared to Group B (8/35), but there was no statistical difference (p = 0.057). In addition, there was no significant difference in morbidity of urinary infection, incidence of incontinence, and impotence between the two groups (p > 0.05). Compared to the traditional open realignment, the new technique of urethral realignment under flexible endoscope has the advantage of short operation time, minimally invasive and less complications.

  16. Adaptive Local Realignment of Protein Sequences.

    PubMed

    DeBlasio, Dan; Kececioglu, John

    2018-06-11

    While mutation rates can vary markedly over the residues of a protein, multiple sequence alignment tools typically use the same values for their scoring-function parameters across a protein's entire length. We present a new approach, called adaptive local realignment, that in contrast automatically adapts to the diversity of mutation rates along protein sequences. This builds upon a recent technique known as parameter advising, which finds global parameter settings for an aligner, to now adaptively find local settings. Our approach in essence identifies local regions with low estimated accuracy, constructs a set of candidate realignments using a carefully-chosen collection of parameter settings, and replaces the region if a realignment has higher estimated accuracy. This new method of local parameter advising, when combined with prior methods for global advising, boosts alignment accuracy as much as 26% over the best default setting on hard-to-align protein benchmarks, and by 6.4% over global advising alone. Adaptive local realignment has been implemented within the Opal aligner using the Facet accuracy estimator.

  17. 75 FR 71420 - Department of the Navy

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-23

    ...) Brunswick, Maine. The DoN is required to close NAS Brunswick per Public Law 101-510, the Defense Base... with Public Law 101-510, the Defense Base closure and Realignment Act of 1990, as amended in 2005. NAS...

  18. 77 FR 34974 - Solicitation for Comments on the Proposed Realignment of the Division of Workforce Development...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ...The Office of the Assistant Secretary--Indian Affairs (AS-IA) is considering realigning the Division of Workforce Development (DWD), now located in the Office of Indian Energy and Economic Development (IEED) within AS-IA, to the Bureau of Indian Affairs, under the Office of the Deputy Director--Indian Services. This notice seeks comments on this proposed realignment from federally recognized American Indian Tribes and Alaska Native entities.

  19. Peri-talar re-alignment osteotomy for joint preservation in asymmetrical ankle osteoarthritis

    PubMed Central

    Yi, Young; Lee, Woochun

    2017-01-01

    Various types of re-alignment surgery are used to preserve the ankle joint in cases of intermediate ankle arthritis with partial joint space narrowing. The short-term and mid-term results after re-alignment surgery are promising, with substantial post-operative pain relief and functional improvement that is reflected by high rates of patient satisfaction. In this context, re-alignment surgery can preserve the joint and reduce the pathological load that acts on the affected area. Good clinical and radiological outcomes can be achieved in asymmetrical ankle osteoarthritis by understanding the specific deformities and appropriate indications for different surgical techniques. Cite this article: EFORT Open Rev 2017;2:324-331. DOI: 10.1302/2058-5241.2.160021 PMID:28828181

  20. Effect of Age and Proteoglycan Deficiency on Collagen Fiber Re-Alignment and Mechanical Properties in Mouse Supraspinatus Tendon

    PubMed Central

    Connizzo, Brianne K.; Sarver, Joseph J.; Iozzo, Renato V.; Birk, David E.; Soslowsky, Louis J.

    2013-01-01

    Collagen fiber realignment is one mechanism by which tendon responds to load. Re-alignment is altered when the structure of tendon is altered, such as in the natural process of aging or with alterations of matrix proteins, such as proteoglycan expression. While changes in re-alignment and mechanical properties have been investigated recently during development, they have not been studied in (1) aged tendons, or (2) in the absence of key proteoglycans. Collagen fiber re-alignment and the corresponding mechanical properties are quantified throughout tensile mechanical testing in both the insertion site and the midsubstance of mouse supraspinatus tendons in wild type (WT), decorin-null (Dcn-/-), and biglycan-null (Bgn-/-) mice at three different ages (90 days, 300 days, and 570 days). Percent relaxation was significantly decreased with age in the WT and Dcn-/- tendons, but not in the Bgn-/- tendons. Changes with age were found in the linear modulus at the insertion site where the 300 day group was greater than the 90 day and 570 day group in the Bgn-/- tendons and the 90 day group was smaller than the 300 day and 570 day groups in the Dcn-/- tendons. However, no changes in modulus were found across age in WT tendons were found. The midsubstance fibers of the WT and Bgn-/- tendons were initially less aligned with increasing age. The re-alignment was significantly altered with age in the WT tendons, with older groups responding to load later in the mechanical test. This was also seen in the Dcn-/- midsubstance and the Bgn-/- insertion, but not in the other locations. Although some studies have found changes in the WT mechanical properties with age, this study did not support those findings. However, it did show fiber re-alignment changes at both locations with age, suggesting a breakdown of tendon′s ability to respond to load in later ages. In the proteoglycan-null tendons however, there were changes in the mechanical properties, accompanied only by location-dependent re-alignment changes, suggesting a site-specific role for these molecules in loading. Finally, changes in the mechanical properties did not occur in concert with changes in re-alignment, suggesting that typical mechanical property measurements alone are insufficient to describe how structural alterations affect tendon′s response to load. PMID:23445064

  1. 32 CFR 174.18 - Historic preservation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT Environmental Matters § 174.18... planning and zoning actions undertaken by units of State or local government; if so, working with such...

  2. 32 CFR 174.18 - Historic preservation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT Environmental Matters § 174.18... planning and zoning actions undertaken by units of State or local government; if so, working with such...

  3. Dynamic photoinduced realignment processes in photoresponsive block copolymer films: effects of the chain length and block copolymer architecture.

    PubMed

    Sano, Masami; Shan, Feng; Hara, Mitsuo; Nagano, Shusaku; Shinohara, Yuya; Amemiya, Yoshiyuki; Seki, Takahiro

    2015-08-07

    A series of block copolymers composed of an amorphous poly(butyl methacrylate) (PBMA) block connected with an azobenzene (Az)-containing liquid crystalline (PAz) block were synthesized by changing the chain length and polymer architecture. With these block copolymer films, the dynamic realignment process of microphase separated (MPS) cylinder arrays of PBMA in the PAz matrix induced by irradiation with linearly polarized light was studied by UV-visible absorption spectroscopy, and time-resolved grazing incidence small angle X-ray scattering (GI-SAXS) measurements using a synchrotron beam. Unexpectedly, the change in the chain length hardly affected the realignment rate. In contrast, the architecture of the AB-type diblock or the ABA-type triblock essentially altered the realignment feature. The strongly cooperative motion with an induction period before realignment was characteristic only for the diblock copolymer series, and the LPL-induced alignment change immediately started for triblock copolymers and the PAz homopolymer. Additionally, a marked acceleration in the photoinduced dynamic motions was unveiled in comparison with a thermal randomization process.

  4. The New York City Neighborhood-Based Services Strategy

    ERIC Educational Resources Information Center

    Chahine, Zeinab; van Straaten, Justine; Williams-Isom, Anne

    2005-01-01

    The New York City Administration for Children's Services (ACS) instituted a neighborhood-based services system through the realignment of all foster care, preventive, and protective services along community district lines. ACS, with its community partners, also formed neighborhood-based networks to improve service coordination and collaboration…

  5. Early endoscopic realignment of post-traumatic posterior urethral disruption.

    PubMed

    Moudouni, S M; Patard, J J; Manunta, A; Guiraud, P; Lobel, B; Guillé, F

    2001-04-01

    The management of complete or partial urethral disruption is controversial, and much debate continues regarding immediate versus delayed definitive therapy. We further analyze our experience and long-term results using early endoscopic realignment. Between April 1987 and January 1999, 29 men with posterior urethral disruption (23 complete and 6 partial) underwent primary urethral realignment 0 to 8 days after injury. Pelvic fractures were present in 23 patients. In all patients, the actual operating time for realignment was 75 minutes or less. All patients were evaluated postoperatively for incontinence, impotence, and strictures. After a mean follow-up of 68 months (range 18 to 155), all patients were continent. Four patients (13.7%) required conversion to an open perineal urethroplasty. At the last follow-up visit, 25 (86%) of the 29 patients were potent and 4 achieved adequate erections for intercourse using intracorporeal injections (prostaglandin E(1)). Twelve patients (41%) developed short secondary strictures and were successfully treated with internal urethrotomy. The mean follow-up of these 12 patients was 83 months (range 34 to 120). Urinary flow rate measurement at the last follow-up visit revealed satisfactory voiding parameters in all patients. Primary endoscopic realignment offers an effective method for treating traumatic urethral injuries. Our long-term follow-up provides additional support for the use of this technique by demonstrating that urethral continuity can be established without an increased incidence of impotence, stricture formation, or incontinence. In case of failure, endoscopic realignment does not compromise the result of secondary urethroplasty.

  6. Early endoscopic realignment in posterior urethral injuries.

    PubMed

    Shrestha, B; Baidya, J L

    2013-01-01

    Posterior urethral injury requires meticulous tertiary care and optimum expertise to manage successfully. The aim of our study is to describe our experiences with pelvic injuries involving posterior urethra and their outcome after early endoscopic realignment. A prospective study was carried out in 20 patients with complete posterior urethral rupture, from November 2007 till October 2010. They presented with blunt traumatic pelvic fracture and underwent primary realignment of posterior urethra in our institute. The definitive diagnosis of urethral rupture was made after retrograde urethrography and antegrade urethrography where applicable. The initial management was suprapubic catheter insertion after primary trauma management in casualty. After a week of conservative management with intravenous antibiotics and pain management, patients were subjected to the endoscopic realignment. The follow up period was at least six months. The results were analyzed with SPSS software. After endoscopic realignment, all patients were advised CISC for the initial 3 months. All patients voided well after three months of CISC. However, 12 patients were lost to follow up by the end of 6 postoperative months. Out of eight remaining patients, two had features of restricture and were managed with DVU followed by CISC again. One patient with restricture had some degree of erectile dysfunction who improved significantly after phospodiesterase inhibitors. None of the patients had features of incontinence. Early endoscopic realignment of posterior urethra is a minimally invasive modality in the management of complete posterior urethral injury with low rates of incontinence and impotency.

  7. Federal Agency Hazardous Waste Compliance Docket

    EPA Pesticide Factsheets

    List of the Federal Agency Hazardous Waste Compliance Docket Facilities comprised of four lists: National Priorities List (NPL), Non-National Priorities List, Base Realignment and Closure Act (BRAC), and Resource Conservation and Recovery Act (RCRA).

  8. Process management using component thermal-hydraulic function classes

    DOEpatents

    Morman, James A.; Wei, Thomas Y. C.; Reifman, Jaques

    1999-01-01

    A process management expert system where following malfunctioning of a component, such as a pump, for determining system realignment procedures such as for by-passing the malfunctioning component with on-line speeds to maintain operation of the process at full or partial capacity or to provide safe shut down of the system while isolating the malfunctioning component. The expert system uses thermal-hydraulic function classes at the component level for analyzing unanticipated as well as anticipated component malfunctions to provide recommended sequences of operator actions. Each component is classified according to its thermal-hydraulic function, and the generic and component-specific characteristics for that function. Using the diagnosis of the malfunctioning component and its thermal hydraulic class, the expert system analysis is carried out using generic thermal-hydraulic first principles. One aspect of the invention employs a qualitative physics-based forward search directed primarily downstream from the malfunctioning component in combination with a subsequent backward search directed primarily upstream from the serviced component. Generic classes of components are defined in the knowledge base according to the three thermal-hydraulic functions of mass, momentum and energy transfer and are used to determine possible realignment of component configurations in response to thermal-hydraulic function imbalance caused by the malfunctioning component. Each realignment to a new configuration produces the accompanying sequence of recommended operator actions. All possible new configurations are examined and a prioritized list of acceptable solutions is produced.

  9. Process management using component thermal-hydraulic function classes

    DOEpatents

    Morman, J.A.; Wei, T.Y.C.; Reifman, J.

    1999-07-27

    A process management expert system where following malfunctioning of a component, such as a pump, for determining system realignment procedures such as for by-passing the malfunctioning component with on-line speeds to maintain operation of the process at full or partial capacity or to provide safe shut down of the system while isolating the malfunctioning component. The expert system uses thermal-hydraulic function classes at the component level for analyzing unanticipated as well as anticipated component malfunctions to provide recommended sequences of operator actions. Each component is classified according to its thermal-hydraulic function, and the generic and component-specific characteristics for that function. Using the diagnosis of the malfunctioning component and its thermal hydraulic class, the expert system analysis is carried out using generic thermal-hydraulic first principles. One aspect of the invention employs a qualitative physics-based forward search directed primarily downstream from the malfunctioning component in combination with a subsequent backward search directed primarily upstream from the serviced component. Generic classes of components are defined in the knowledge base according to the three thermal-hydraulic functions of mass, momentum and energy transfer and are used to determine possible realignment of component configurations in response to thermal-hydraulic function imbalance caused by the malfunctioning component. Each realignment to a new configuration produces the accompanying sequence of recommended operator actions. All possible new configurations are examined and a prioritized list of acceptable solutions is produced. 5 figs.

  10. The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security Support Services Contract

    DTIC Science & Technology

    2017-03-07

    H 7 , 2 0 1 7 Report No. DODIG-2017-062 The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security...The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security Support Services Contract March 7, 2017... contractor performance for the Kuwait Base Operations and Security Support Services (KBOSSS) contract. The KBOSSS contract is a cost-plus-award-fee

  11. Defense Base Realignment and Closure Military Construction Budget Data for Sheppard Air Force Base, Wichita Falls, Texas

    DTIC Science & Technology

    1995-06-23

    provides the results of the audit of one project, valued at $1.8 million, for the repair of roads on Sheppard Air Force Base, Wichita Falls, Texas. The ... audit also assessed the adequacy of the management control program as it applied to the audit objectives.

  12. Long-term outcome of primary endoscopic realignment for bulbous urethral injuries: risk factors of urethral stricture.

    PubMed

    Seo, Ill Young; Lee, Jea Whan; Park, Seung Chol; Rim, Joung Sik

    2012-12-01

    Although endoscopic realignment has been accepted as a standard treatment for urethral injuries, the long-term follow-up data on this procedure are not sufficient. We report the long-term outcome of primary endoscopic realignment in bulbous urethral injuries. Patients with bulbous urethral injuries were treated by primary endoscopic realignment between 1991 and 2005. The operative procedure included suprapubic cystostomy and transurethral catheterization using a guide wire, within 72 hours of injury. The study population included 51 patients with a minimum follow-up duration of 5 years. The most common causes of the injuries were straddle injury from falling down (74.5%), and pelvic bone fracture (7.8%). Gross hematuria was the most common complaint (92.2%). Twenty-three patients (45.1%) had complete urethral injuries. The mean time to operation after the injury was 38.8±43.2 hours. The mean operation time and mean indwelling time of a urethral Foley catheter were 55.5±37.6 minutes and 22.0±11.9 days, respectively. Twenty out of 51 patients (39.2%) were diagnosed with urethral stricture in 89.1±36.6 months after surgery. A multivariate analysis revealed that young age and operation time were independent risk factors for strictures as a complication of urethral realignment (hazard ratio [HR], 6.554, P=0.032; HR, 6.206, P=0.035). Urethral stricture commonly developed as a postoperative complication of primary endoscopic urethral realignment for bulbous urethral injury, especially in young age and long operation time.

  13. 48 CFR 652.228-70 - Defense Base Act-Covered Contractor Employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Defense Base Act-Covered....228-70 Defense Base Act—Covered Contractor Employees. As prescribed in 628.309-70(a), insert the following provision: Defense Base Act—Covered Contractor Employees (JUN 2006) (a) Bidders/offerors shall...

  14. 48 CFR 652.228-70 - Defense Base Act-Covered Contractor Employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Defense Base Act-Covered....228-70 Defense Base Act—Covered Contractor Employees. As prescribed in 628.309-70(a), insert the following provision: Defense Base Act—Covered Contractor Employees (JUN 2006) (a) Bidders/offerors shall...

  15. Environmental Suitability for Leasing Property

    EPA Pesticide Factsheets

    This is a Memorandum of Understanding between the U.S. Environmental Protection Agency and the U.S. Department of Defense, regarding the procedures to determine environmental suitability for leasing property available as a result of a base closure or realignment.

  16. Summary Report on the Audit of Defense Base Realignment and Closure Budget Data

    DTIC Science & Technology

    1996-04-03

    management control program as it applied to the audit objectives. This report summarizes the results of the specific objectives in Finding A and discusses the management control objective in Finding B.

  17. Realignment of Nanocrystal Aggregates into Single Crystals as a Result of Inherent Surface Stress

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liu, Zhaoming; Pan, Haihua; Zhu, Genxing

    2016-07-19

    Assembly of nanoparticles building blocks during single crystal growth is widely observed in both natural and synthetic environments. Although this form of non-classical crystallization is generally described by oriented attachment, random aggregation of building blocks leading to single crystal products is also observed, but the mechanism of crystallographic realignment is unknown. We herein reveal that random attachment during aggregation-based growth initially produces a non-oriented growth front. Subsequent evolution of the orientation is driven by the inherent surface stress applied by the disordered surface layer and results in single crystal formation via grain boundary migration. This mechanism is corroborated by measurementsmore » of orientation rate vs external stress, demonstrating a predictive relationship between the two. These findings advance our understanding of aggregation-based growth of natural minerals by nanocrystals, and suggest an approach to material synthesis that takes advantage of stress induced co-alignment.« less

  18. Generalization of Prism Adaptation

    ERIC Educational Resources Information Center

    Redding, Gordon M.; Wallace, Benjamin

    2006-01-01

    Prism exposure produces 2 kinds of adaptive response. Recalibration is ordinary strategic remapping of spatially coded movement commands to rapidly reduce performance error. Realignment is the extraordinary process of transforming spatial maps to bring the origins of coordinate systems into correspondence. Realignment occurs when spatial…

  19. Managed Realignment in Europe: Achievements and Challenges

    NASA Astrophysics Data System (ADS)

    Esteves, L. S.

    2017-12-01

    Environmental and financial sustainability associated with climate change adaptation needs are the key drivers leading to the development of national and regional strategies which promote managed realignment. Managed realignment aims to maximise environmental and socioeconomic benefits by creating space for coastal habitats to evolve more naturally. Therefore, the natural adaptive capacity of coastal habitats and the range of ecosystem services they provide are paramount to the success of these strategies. In Europe, most projects involve the creation of intertidal areas by artificially restoring tidal flow into embanked land. Projects generally involve at least one of the following: removal, breach, or realignment of existing coastal protection, controlled tidal restoration and managed retreat (i.e. relocation from risk areas). Since early 1980s, over 140 managed realignment projects have been implemented (or are under construction) in Europe, mainly in the UK, France, Germany, Netherlands, Belgium and Spain, resulting in approximately 15,800 ha of habitat creation. This paper will present an overview of managed realignment initiatives in Europe, summarise achievements so far and discuss ways to overcome commonly faced challenges, focusing on high-level strategy; delivery of objectives at the project level; and public perception. Projects vary greatly as planning must take into account local social and environmental characteristics and constraints. Evidence of benefits gained in each project and their contribution to high level targets need to be quantified and widely disseminated to help attract public support. However, the lack of information and/or undisputable evidence about the realisation of tangible socioeconomic benefits is still hindering public acceptance. The knowledge about how the many social, economic, and technical aspects interact is evolving fast as new policies are formulated, more projects are implemented, and monitoring data are made available.

  20. The Availability of Judicial Review Regarding Military Base Closures and Realignments

    DTIC Science & Technology

    2005-06-30

    held that the President is not subject to the APA, due to separation of powers principles.37 Base Closure Act Claims The Dalton Court distinguished...that the 1988 Base Closure Act violated the non-delegation doctrine and the separation of powers doctrine.53 However, the Base Closure Act has not yet been held unconstitutional by any federal appellate courts.

  1. Actin realignment and cofilin regulation are essential for barrier integrity during shear stress

    PubMed Central

    Slee, Joshua B.; Lowe-Krentz, Linda J.

    2014-01-01

    Vascular endothelial cells and their actin microfilaments align in the direction of fluid shear stress (FSS) in vitro and in vivo. To determine whether cofilin, an actin severing protein, is required in this process, the levels of phospho-cofilin (serine-3) were evaluated in cells exposed to FSS. Phospho-cofilin levels decreased in the cytoplasm and increased in the nucleus during FSS exposure. This was accompanied by increased nuclear staining for activated LIMK, a cofilin kinase. Blocking stress kinases JNK and p38, known to play roles in actin realignment during FSS, decreased cofilin phosphorylation under static conditions, and JNK inhibition also resulted in decreased phospho-cofilin during FSS exposure. Inhibition of dynamic changes in cofilin phosphorylation through cofilin mutants decreased correct actin realignment. The mutants also decreased barrier integrity as did inhibition of the stress kinases. These results identify the importance of cofilin in the process of actin alignment and the requirement for actin realignment in endothelial barrier integrity during FSS. PMID:23060131

  2. Military Base Realignments and Closures: Process for Reusing Property for Homeless Assistance Needs Improvements

    DTIC Science & Technology

    2015-03-01

    Reserve Base Willow Grove, Pennsylvania 2 Naval Support Activity New Orleans–East Bank, Louisiana 1 Onizuka Air Force Station, California 3...and white . Pricing and ordering information is posted on GAO’s website, http://www.gao.gov/ordering.htm. Place orders by calling (202) 512-6000

  3. Orbital operation study. Volume 3: Basic vehicle summaries

    NASA Technical Reports Server (NTRS)

    Anderson, N. R.; Gianformaggio, A.

    1972-01-01

    The vehicle related data developed during the orbital operations study are described. The interfacing activity findings have been realigned into the four basic vehicle systems as follows: (1) earth orbital shuttle (EOS), (2) research and applications module (RAM), (3) space based, ground based, manned and unmanned tugs, and (4) modular space station (MSS).

  4. 77 FR 55896 - Notice of Release Effecting Federal Grant Assurance Obligations Due to Airport Layout Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    ... Grant Assurance Obligations Due to Airport Layout Plan Revision at Mather Airport, Sacramento, CA AGENCY... Mather Airport, Sacramento, California, which will provide for a release from the Grant Agreement... the closure of Mather Air Force Base pursuant to the Defense Base Closure and Realignment Act of 1988...

  5. Rethinking the State-Local Relationship: K-12 Education

    ERIC Educational Resources Information Center

    Weston, Margaret

    2011-01-01

    Governor Jerry Brown's January 2011 budget proposal suggests shifting responsibility and funding for many state programs from the state to the local level. Under this "realignment" of government authority, local governments--usually counties--would be given responsibility for providing the services in realigned programs, and the state…

  6. Starting at the End When Planning for Base Closure

    DTIC Science & Technology

    2016-05-17

    order-style mes- sages with all personnel on the base, including contractors , to ensure that everyone was aware of drawdown requirements and could...Shank All” on both the Nonsecure Internet Protocol Rout- er Network, which was mainly used for National Guard Soldiers and contractors , and the...in attendance. Manage Contractors Effectively Contractors were the logistics backbone of the TB, so a great deal of deliberate planning was

  7. Military Construction, Veterans Affairs, and Related Agencies: FY2009 Appropriations

    DTIC Science & Technology

    2008-09-17

    Defense Posture Realignment ( GDPR ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Repealing the BRAC Commission Mechanism... GDPR One-Time Implementation Costs . . . . . . . . . . . . . . . . . . 12 Table 4. Department of Veterans Affairs Appropriations, FY2002-FY2008...IGPBS) has been renamed the Global Defense Posture Realignment ( GDPR ). 17 Office of the Under Secretary of Defense (Comptroller), National Defense

  8. America’s Army: The Strength of the Nation, Strategic Plan, 2009-2015

    DTIC Science & Technology

    2008-11-02

    Realignment and Closure (BRAC) law of 2005 and several complex endeavors like the Grow-the-Army (GTA) and Global Defense Posture Realignment ( GDPR ...2.2.1 Oversee execution of MILCON to support Army stationing (AMF, BRAC, GDPR , and Army Growth) initiatives and timelines

  9. 75 FR 55313 - Final Environmental Impact Statement (FEIS) for Grow the Army Actions at Fort Lewis and the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-10

    ... decisions in the 2007 Army Growth and Force Structure Realignment Programmatic EIS (also referred to as the... of Public Works, Attention: IMWE-LEW-PWE (Mr. Paul T. Steucke, Jr.), Building 2012, Liggett Avenue..., Yakima Training Center, and McChord Air Force Base were designated a joint base and renamed ``Joint Base...

  10. 75 FR 29322 - Base Closure and Realignment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ...-6020. Local Redevelopment Authority (LRA) Arizona Installation Name: Air Force Research Laboratory. LRA... provides a corresponding listing of the Local Redevelopment Authorities (LRA) for the Air Force Research Laboratory, Arizona, and portions of the Newport Naval Complex, Rhode Island, recognized by the Secretary of...

  11. Cost-Aware Design of a Discrimination Strategy for Unexploded Ordnance Cleanup

    DTIC Science & Technology

    2011-02-25

    Acronyms ANN: Artificial Neural Network AUC: Area Under the Curve BRAC: Base Realignment And Closure DLRT: Distance Likelihood Ratio Test EER...Discriminative Aggregate Nonparametric [25] Artificial Neural Network ANN Discriminative Aggregate Parametric [33] 11 Results and Discussion Task #1

  12. Mission Realignment of Goodfellow Air Force Base, Texas

    DTIC Science & Technology

    1989-12-01

    rat snake, and desert kingsnake . Lizards include the collared lizard, Texas horned lizard, eastern tree lizard, Great Plains skink, ground skink...oQt rcnrictor Bullsnake .iuophis melanoleuc Great plains rat snake Elaphe guflt Desert kingsnake Lampropeltis getulus Collared lizard .rQty.U• collaris

  13. Location and stability analysis of the Michigamme Underground Mine for the US-41 re-alignment in Marquette County, Michigan.

    DOT National Transportation Integrated Search

    2008-08-01

    A proposed realignment of US-41 near Michigamme, Michigan will be located over an abandoned underground iron ore : mine. The mine, known as the Michigamme Mine, was started in 1872 and closed in 1901. Initial mining operations : were started in seven...

  14. 78 FR 11632 - Notice of Availability for the Draft Finding of No Significant Impact and Final Programmatic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... Significant Impact and Final Programmatic Environmental Assessment for Army 2020 Force Structure Realignment... Significant Impact (FNSI) and final Programmatic Environmental Assessment (PEA) for Army 2020 force structure realignments that may occur from Fiscal Years (FYs) 2013-2020. The Army published the Notice of Availability of...

  15. Reconfiguring and Realigning the Assessment Feedback Processes for an Undergraduate Criminology Degree

    ERIC Educational Resources Information Center

    Case, Stephen

    2007-01-01

    A reconfigured and realigned system of assessment feedback was implemented with undergraduates taking criminology modules at Swansea University. The reformulated system integrated explicit engagement with assessment criteria in feedback given on an electronic template form with the use of a statement bank and the offer of follow-up, feedback…

  16. High-speed polarized light microscopy for in situ, dynamic measurement of birefringence properties

    NASA Astrophysics Data System (ADS)

    Wu, Xianyu; Pankow, Mark; Shadow Huang, Hsiao-Ying; Peters, Kara

    2018-01-01

    A high-speed, quantitative polarized light microscopy (QPLM) instrument has been developed to monitor the optical slow axis spatial realignment during controlled medium to high strain rate experiments at acquisition rates up to 10 kHz. This high-speed QPLM instrument is implemented within a modified drop tower and demonstrated using polycarbonate specimens. By utilizing a rotating quarter wave plate and a high-speed camera, the minimum acquisition time to generate an alignment map of a birefringent specimen is 6.1 ms. A sequential analysis method allows the QPLM instrument to generate QPLM data at the high-speed camera imaging frequency 10 kHz. The obtained QPLM data is processed using a vector correlation technique to detect anomalous optical axis realignment and retardation changes throughout the loading event. The detected anomalous optical axis realignment is shown to be associated with crack initiation, propagation, and specimen failure in a dynamically loaded polycarbonate specimen. The work provides a foundation for detecting damage in biological tissues through local collagen fiber realignment and fracture during dynamic loading.

  17. 48 CFR 226.7102 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEFENSE SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Preference for Local and Small Businesses 226.7102 Policy. Businesses located in the vicinity of a military installation that is being closed or realigned under a base closure law, including 10 U.S.C. 2687, and small and small disadvantaged businesses...

  18. ON THE TIDAL ORIGIN OF HOT JUPITER STELLAR OBLIQUITY TRENDS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dawson, Rebekah I., E-mail: rdawson@berkeley.edu

    It is debated whether the two hot Jupiter populations—those on orbits misaligned from their host star's spin axis and those well-aligned—result from two migration channels or from two tidal realignment regimes. Here I demonstrate that equilibrium tides raised by a planet on its star can account for three observed spin-orbit alignment trends: the aligned orbits of hot Jupiters orbiting cool stars, the planetary mass cut-off for retrograde planets, and the stratification by planet mass of cool host stars' rotation frequencies. The first trend can be caused by strong versus weak magnetic braking (the Kraft break), rather than realignment of themore » star's convective envelope versus the entire star. The second trend can result from a small effective stellar moment of inertia participating in the tidal realignment in hot stars, enabling massive retrograde planets to partially realign to become prograde. The third trend is attributable to higher-mass planets more effectively counteracting braking to spin up their stars. Both hot and cool stars require a small effective stellar moment of inertia participating in the tidal realignment, e.g., an outer layer weakly coupled to the interior. I demonstrate via Monte Carlo that this model can match the observed trends and distributions of sky-projected misalignments and stellar rotation frequencies. I discuss implications for inferring hot Jupiter migration mechanisms from obliquities, emphasizing that even hot stars do not constitute a pristine sample.« less

  19. 78 FR 4425 - Notice of Proposed Information Collection: Comment Request; Multifamily Contractor's Mortgagor's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... Information Collection: Comment Request; Multifamily Contractor's Mortgagor's Cost Breakdowns and... comments on the subject proposal. Contractors use the form HUD-2328 to establish a schedule of values of construction items on which the monthly advances or mortgage proceeds are based. Contractors use the form HUD...

  20. 78 FR 51658 - Weighing, Feed, and Swine Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-21

    ... RIN 0580-AA99 Weighing, Feed, and Swine Contractors AGENCY: Grain Inspection, Packers and Stockyards... and swine contractors to poultry and swine production contract growers are based on accurate weighing... reweighing to add swine contractors to the list of firms that must comply, and adding feed to the list of...

  1. Early effectiveness of endoscopic posterior urethra primary alignment.

    PubMed

    Kim, Fernando J; Pompeo, Alexandre; Sehrt, David; Molina, Wilson R; Mariano da Costa, Renato M; Juliano, Cesar; Moore, Ernest E; Stahel, Philip F

    2013-08-01

    Posterior urethra primary realignment (PUPR) after complete transection may decrease the gap between the ends of the transected urethra, tamponade the retropubic bleeding, and optimize urinary drainage without the need of suprapubic catheter facilitating concurrent pelvic orthopedic and trauma procedures. Historically, the distorted anatomy after pelvic trauma has been a major surgical challenge. The purpose of the study was to assess the relationship of the severity of the pelvic fracture to the success of endoscopic and immediate PUPR following complete posterior urethral disruption using the Young-Burgess classification system. A review of our Level I trauma center database for patients diagnosed with pelvic fracture and complete posterior urethral disruption from January 2005 to April 2012 was performed. Pelvic fracture severity was categorized according to the Young-Burgees classification system. Management consisted of suprapubic catheter insertion at diagnosis followed by early urethral realignment when the patient was clinically stable. Failure of realignment was defined as inability to achieve urethral continuity with Foley catheterization. Clinical follow-up consisted of radiologic, pressure studies and cystoscopic evaluation. A total of 481 patients with pelvic trauma from our trauma registry were screened initially, and 18 (3.7%) were diagnosed with a complete posterior urethral disruption. A total of 15 primary realignments (83.3%) were performed all within 5 days of trauma. The success rate of early realignment was 100%. There was no correlation between the type of pelvic ring fracture and the success of PUPR. Postoperatively, 8 patients (53.3%) developed urethral strictures, 3 patients (20.0%) developed incontinence, and 7 patients (46.7%) reported erectile dysfunction after the trauma. The mean follow-up of these patients was 31.8 months. Endoscopic PUPR may be an effective option for the treatment of complete posterior urethral disruption and enables urinary drainage to best suit the multispecialty surgical team. The success rate of achieving primary realignment did not appear to be related to the complexity and type of pelvic ring fracture.

  2. Defense Logistics Agency 1995 Defense Base Realignment and Closure Data Collection Process for the Evaluation Phase.

    DTIC Science & Technology

    1995-05-04

    Commission. The specific objective for the audit was to determine whether the evaluation process that the DLA used to develop recommendations reported to the...1995 Commission was consistently applied and adequately supported. The audit also reviewed applicable management controls.

  3. 75 FR 70916 - Surplus Properties; Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-19

    ... DEPARTMENT OF DEFENSE Department of the Army Surplus Properties; Notice AGENCY: Department of the... agencies and Department of Defense components. This Notice amends the Notice published in the Federal... with the Defense Base Closure and Realignment Act of 1990, Public Law 101-510, as amended, and the 2005...

  4. 75 FR 34714 - Updated Record of Decision (ROD) for Revised Army Growth and Force; Structure Realignment Decisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ...-making process for decisions contained in the updated ROD (2010). The conversion of an HBCT to an SBCT at... DEPARTMENT OF DEFENSE Department of the Army Updated Record of Decision (ROD) for Revised Army Growth and Force; Structure Realignment Decisions AGENCY: Department of the Army, DoD. ACTION: Notice of...

  5. The Sociolinguistic Realignment in the Chinese Community in Kuala Lumpur: Past, Present and Future

    ERIC Educational Resources Information Center

    Wang, Xiaomei

    2010-01-01

    The language situation in the Malaysian Chinese community has undergone great changes in the past century. This paper aims to account for such changes in the framework of sociolinguistic realignment, which is both descriptive and predictive. The triglossic situation in the colonial period (1859-1957) is described; with the support of a language…

  6. Optimal Contractor Selection in Construction Industry: The Fuzzy Way

    NASA Astrophysics Data System (ADS)

    Krishna Rao, M. V.; Kumar, V. S. S.; Rathish Kumar, P.

    2018-02-01

    A purely price-based approach to contractor selection has been identified as the root cause for many serious project delivery problems. Therefore, the capability of the contractor to execute the project should be evaluated using a multiple set of selection criteria including reputation, past performance, performance potential, financial soundness and other project specific criteria. An industry-wide questionnaire survey was conducted with the objective of identifying the important criteria for adoption in the selection process. In this work, a fuzzy set based model was developed for contractor prequalification/evaluation, by using effective criteria obtained from the percept of construction professionals, taking subjective judgments of decision makers also into consideration. A case study consisting of four alternatives (contractors in the present case) solicited from a public works department of Pondicherry in India, is used to illustrate the effectiveness of the proposed approach. The final selection of contractor is made based on the integrated score or Overall Evaluation Score of the decision alternative in prequalification as well as bid evaluation stages.

  7. 43 CFR 404.23 - How will Reclamation determine whether you or your contractor is qualified to conduct an...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... or your contractor is qualified to conduct an appraisal investigation or a feasibility study? 404.23... feasibility study yourself or though a contractor, Reclamation will evaluate whether you, your technical staff, or contractor are qualified to perform the appraisal investigation or feasibility study based on...

  8. 48 CFR 1852.216-77 - Award fee for end item contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contractor's performance for the entire contract will be evaluated to determine total earned award fee. No award fee or base fee will be paid to the Contractor if the final award fee evaluation is “poor... the Contractor's interim performance every 6* months to monitor Contractor performance prior to...

  9. Research 0n Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project Based on Team Cooperation

    NASA Astrophysics Data System (ADS)

    Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi

    2018-03-01

    It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.

  10. Sequencing the cap-snatching repertoire of H1N1 influenza provides insight into the mechanism of viral transcription initiation

    PubMed Central

    Koppstein, David; Ashour, Joseph; Bartel, David P.

    2015-01-01

    The influenza polymerase cleaves host RNAs ∼10–13 nucleotides downstream of their 5′ ends and uses this capped fragment to prime viral mRNA synthesis. To better understand this process of cap snatching, we used high-throughput sequencing to determine the 5′ ends of A/WSN/33 (H1N1) influenza mRNAs. The sequences provided clear evidence for nascent-chain realignment during transcription initiation and revealed a strong influence of the viral template on the frequency of realignment. After accounting for the extra nucleotides inserted through realignment, analysis of the capped fragments indicated that the different viral mRNAs were each prepended with a common set of sequences and that the polymerase often cleaved host RNAs after a purine and often primed transcription on a single base pair to either the terminal or penultimate residue of the viral template. We also developed a bioinformatic approach to identify the targeted host transcripts despite limited information content within snatched fragments and found that small nuclear RNAs and small nucleolar RNAs contributed the most abundant capped leaders. These results provide insight into the mechanism of viral transcription initiation and reveal the diversity of the cap-snatched repertoire, showing that noncoding transcripts as well as mRNAs are used to make influenza mRNAs. PMID:25901029

  11. 78 FR 22529 - Information on Surplus Land at a Military Installation Designated for Disposal: Naval Air Station...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-16

    ... Installation Designated for Disposal: Naval Air Station Alameda, Alameda, California AGENCY: Department of the... at Naval Air Station Alameda, Alameda, California. FOR FURTHER INFORMATION CONTACT: Ms. Laura Duchnak, Director, Naval Facilities Engineering Command, Base Realignment and Closure Program Management Office...

  12. Effect of early realignment on length and delayed repair of postpelvic fracture urethral injury.

    PubMed

    Koraitim, Mamdouh M

    2012-04-01

    To determine the effect of early realignment of posterior urethral injury on the length and delayed repair of ensuing urethral defect. We reviewed the medical records of 120 patients with a pelvic fracture urethral defect who were referred for delayed repair from elsewhere from 1995 to 2009. The review was focused on 5 variables: initial management of urethral injury, length of urethral defect, type of delayed repair, continence, and erectile function. Of the patients, 26 were excluded from the study and 94 were categorized as having been initially treated by realignment (42 patients, group 1) or suprapubic cystostomy (52 patients, group 2). Urethral defects ≤ 2 cm in length were found in 28 patients (67%) in group 1 versus 22 (42%) in group 2. Defects >2 cm were found in 14 patients (33%) in group 1 versus 30 (58%) in group 2. The repair was accomplished by a simple perineal operation in 32 (76%) and 30 (58%) patients in groups 1 and 2, respectively. An elaborated perineal or perineo-abdominal procedure was required in 10 (24%) and 22 (42%) patients in groups 1 and 2, respectively (all P < .05). Incontinence occurred in 1 patient in group 1. Impotence developed in 10 (28%) of 36 realigned adults and in 2 (5%) of 38 adults with suprapubic cystostomy. Early realignment of posterior urethral injury decreases the length of the ensuing urethral defect and facilitates its delayed repair. Incontinence and impotence appear to result from the injury itself and not the treatment. Copyright © 2012 Elsevier Inc. All rights reserved.

  13. Tissue Strain Reorganizes Collagen With a Switchlike Response That Regulates Neuronal Extracellular Signal-Regulated Kinase Phosphorylation In Vitro: Implications for Ligamentous Injury and Mechanotransduction

    PubMed Central

    Zhang, Sijia; Cao, Xuan; Stablow, Alec M.; Shenoy, Vivek B.; Winkelstein, Beth A.

    2016-01-01

    Excessive loading of ligaments can activate the neural afferents that innervate the collagenous tissue, leading to a host of pathologies including pain. An integrated experimental and modeling approach was used to define the responses of neurons and the surrounding collagen fibers to the ligamentous matrix loading and to begin to understand how macroscopic deformation is translated to neuronal loading and signaling. A neuron-collagen construct (NCC) developed to mimic innervation of collagenous tissue underwent tension to strains simulating nonpainful (8%) or painful ligament loading (16%). Both neuronal phosphorylation of extracellular signal-regulated kinase (ERK), which is related to neuroplasticity (R2 ≥ 0.041; p ≤ 0.0171) and neuronal aspect ratio (AR) (R2 ≥ 0.250; p < 0.0001), were significantly correlated with tissue-level strains. As NCC strains increased during a slowly applied loading (1%/s), a “switchlike” fiber realignment response was detected with collagen reorganization occurring only above a transition point of 11.3% strain. A finite-element based discrete fiber network (DFN) model predicted that at bulk strains above the transition point, heterogeneous fiber strains were both tensile and compressive and increased, with strains in some fibers along the loading direction exceeding the applied bulk strain. The transition point identified for changes in collagen fiber realignment was consistent with the measured strain threshold (11.7% with a 95% confidence interval of 10.2–13.4%) for elevating ERK phosphorylation after loading. As with collagen fiber realignment, the greatest degree of neuronal reorientation toward the loading direction was observed at the NCC distraction corresponding to painful loading. Because activation of neuronal ERK occurred only at strains that produced evident collagen fiber realignment, findings suggest that tissue strain-induced changes in the micromechanical environment, especially altered local collagen fiber kinematics, may be associated with mechanotransduction signaling in neurons. PMID:26549105

  14. Use of a Multivector Mandibular Distractor for Treatment of Pediatric Proximal Interphalangeal Joint Pilon Fractures: A Case-Based Review.

    PubMed

    Pedreira, Rachel; Cho, Brian H; Geer, Angela; DeJesus, Ramon A

    2018-04-01

    The difficulties in surgical treatment of pilon fractures of the finger include fragment reconstitution and posthealing stiffness. In adults, external fixation with traction and early active range of motion (AROM)/passive range of motion (PROM) during healing is considered necessary for avoiding joint stiffness and attaining realignment. The authors present a unique approach to pediatric pilon fractures that uses open reduction and multivector external fixation with delayed AROM/PROM. Initial immobilization and significant traction allowed for joint realignment and prevented noncompliance with staged distraction. The authors believe this immobilization leads to a superior outcome because, unlike adults, children tend to avoid stiffness and a larger distraction force allowed for sufficient joint realignment to regain range of motion (ROM). A right-handed 13-year-old boy sustained a right ring finger fracture and presented 12 days later. Radiographs revealed a comminuted Salter-Harris 4 fracture of the middle phalanx. The patient underwent open reduction and placement of multivector external fixation using a pediatric mandibular distractor/fixator. Significant traction was applied to distract the finger to length. Hardware was removed 6 weeks postoperatively and AROM was initiated after splinting. The patient started PROM 8 weeks postoperatively. Strengthening was initiated 2 weeks later. ROM improved and rehabilitation was continued. The patient exhibited nearly equal grip strength 12 weeks postoperatively. At 14 months follow-up, radiographs showed complete healing and joint realignment. There was no deformity or pain and finger length was restored. Management of pediatric pilon fractures is rarely described and presents unique considerations. Early-stage traction and immobilization using a multivector mandibular fixator/distractor is suitable in a child because noncompliance is avoided and there is a decreased risk for stiffness. Combining early immobilization with subsequent-staged AROM, PROM, and strengthening resulted in no loss of ROM and maintained articular symmetry.

  15. F/EF-111 Basing at Cannon Air Force Base, Curry County, New Mexico

    DTIC Science & Technology

    1992-04-01

    construction on Base and at Melrose Rang6, Mount Dora Military Operations Area (MOA), and Pecos MOA are proposed actions associated with the realignment...Under the Mount Dora MOA, 1987 ....................................................................... 3-13 Table 3.1-5 Visitation at State and...National Parks Located in the Area Under the Mount Dora MOA ........................... 3-14 Table 3.2-1 Federal and State Ambient Air Quality Standards

  16. Aligning Infrastructure Decisions with Strategic Vision

    DTIC Science & Technology

    2012-03-22

    last ten years and produced several documents such as: Global Defense Posture Review ( GDPR ), Overseas Basing Commission Report, Base Realignment and...significant force structure changes in the form of GDPR , Army Modular Force, and the ARFORGEN process. These concurrent demands forced a holistic...returning to domestic bases as part of the GDPR and the reduction of leased space in the DoD portfolio.26 BRAC 2005 demonstrated failures in cost

  17. JPRS Report China.

    DTIC Science & Technology

    1988-08-09

    conditions conducive to price reform through realigning the industrial structure . What is meant by holding off is that, as long as the present...onus will be on the owners, and we will see a realigning of the capital structure , and varying increases or decreases in the property of capital...prices among farm products and preserve a rational structure for the agricultural industry. 12513 Enterprise, Corporate Ownership Discussed

  18. The DHS Directorate of Science and Technology: Key Issues for Congress

    DTIC Science & Technology

    2009-06-22

    recently under the authority of the Homeland Security Act. Environmental Measurements Laboratory The Environmental Measurements Laboratory ( EML ) in...Historically, the focus of EML was detection and monitoring of low-level radiation releases. The transfer of EML to the S&T Directorate required a realignment...debated whether EML is most appropriately positioned in 7 EML realignment and related

  19. The "Messy" Business of Academic Developers Leading Other Academic Developers: Critical Reflection on a Curriculum Realignment Exercise

    ERIC Educational Resources Information Center

    Thomas, Sharon; Cordiner, Moira

    2014-01-01

    Little has been written about academic developers (ADs) working in teams leading other ADs. This paper chronicles the experience of a group of ADs in one Australian university working on a curriculum realignment exercise. Unexpectedly the dominant theme in participants' reflections was group dynamics, not the process. We were confronted by…

  20. Management of Sub-axial Cervical Spine Injuries

    PubMed Central

    Zaveri, Gautam; Das, Gurdip

    2017-01-01

    Sub-axial cervical spine injuries are commonly seen in patients with blunt trauma. They may be associated with spinal cord injury resulting in tetraplegia and severe permanent disability. Immobilization of the neck, maintenance of blood pressure and oxygenation, rapid clinical and radiological assessment of all injuries, and realignment of the spinal column are the key steps in the emergency management of these injuries. The role of intravenous methylprednisolone administration in acute spinal cord injuries remains controversial. The definitive management of these injuries is based upon recognition of the fracture pattern, assessment of the degree of instability, the presence or absence of neurologic deficit, and other patient related factors that may influence the outcome. Nonoperative treatment comprises of some form of external immobilization for 8 to 12 weeks, followed by imaging to assess fracture healing, and to rule out instability. The goals of surgery are realignment of the vertebral column, decompression of the neural elements and instrumented stabilization. PMID:29200479

  1. 2005 Defense Base Closure and Realignment Commission Report. Volume 2

    DTIC Science & Technology

    2005-01-01

    known as the Superfund, is the legal framework for the identification, restoration, and transfer of contaminated property. In 1986, CERCLA was revised...place and operating pursuant to an approved remedial design. This allows the transfer prior to complete remediation of contamination , (source: 2005...uncontaminated parcels at closing bases while long-term cleanup of contaminated parcels continues, (source: 2005 BRAC Commission) CERTIFIED DATA P.L

  2. Final Environmental Assessment to Implement the Defense Base Closure and Realignment Commission Recommendations for Shaw Air Force Base, South Carolina

    DTIC Science & Technology

    2007-07-01

    corresponding years. Year 2005 through 2009: VOCE = .016 * Trips NOxE = .015 * Trips PM10E = .0022 * Trips COE = .262 * Trips Year 2010 and beyond: VOCE ... VOCE * DPYII/2000 Nox (tons/yr) = NOxE * DPYII/2000 PM10(tons/yr) = PM10E * DPYII/2000 CO (tons/yr) = COE * DPYII/2000 Where: Commercial

  3. Proceedings of a Meeting of an American Sub-Group of the Council of Edward A. /Bouchet-ICTP Institute Held in Atlanta, Georgia on 28-29 Mar 1992

    DTIC Science & Technology

    1992-03-29

    Moreover, nuclear and coal-fired power plants could be built further away from high population areas. Magnetically levitated ( maglev ) trains may be the...Japanese bullet trains, going 120 miles/hour, must have their tracks realigned each night. The maglev trains would make this realignment unnecessary

  4. Economic Development Assistance for Communities Affected by Employment Changes Due to Military Base Closures (BRAC)

    DTIC Science & Technology

    2009-06-16

    resolution of disapproval is passed by Congress. Following the actual base closings and realignments, DOD develops an environmental remediation plan...examination of the BRAC process, For environmental remediation issues, see CRS Report RS21822, Military Base Closures: DOD’s 2005 Internal Selection...review and remediation . 2 Prior to the 1988 BRAC round, military installations were closed, or their missions were altered by order of the Secretary of

  5. Novel application of a balloon-anchoring technique for the realignment of a prolapsed pipeline embolization device: a technical report.

    PubMed

    Crowley, R Webster; Abla, Adib A; Ducruet, Andrew F; McDougall, Cameron G; Albuquerque, Felipe C

    2014-07-01

    Flow-diverting stents represent a substantial advancement in the treatment of cerebral aneurysms. They can, however, be associated with unique complications that may require management through adjunctive techniques. To present a technical report of a salvage technique used to realign a prolapsed Pipeline Embolization Device (PED) during the treatment of a giant internal carotid artery (ICA) aneurysm. A patient in his late 70s with an incidental giant supraclinoid ICA aneurysm presented for endovascular consideration. Treatment was planned using the PED. Following placement of the device there were two focal areas of incomplete expansion and balloon angioplasty was performed. This manipulation resulted in foreshortening of the distal aspect of the PED which caused the device to prolapse into the aneurysm. After multiple unsuccessful attempts to regain distal access, a salvage technique was attempted in which a balloon was inflated in the middle cerebral artery and, by applying traction, the PED was realigned with the parent artery. After the PED was realigned, direct distal catheter access was achieved and a second Pipeline device was deployed, successfully covering the aneurysm neck with resultant flow stasis. The patient had no postoperative issues and was discharged 2 days later without deficit. The balloon-anchoring technique was successfully used to realign a PED that had prolapsed into a giant ICA aneurysm. This maneuver prevented potentially disastrous complications and allowed the satisfactory completion of the aneurysm embolization. This represents a useful salvage technique that should be considered when encountering a prolapsed stent. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  6. 75 FR 8485 - Revocation of Class D and E Airspace; Brunswick, ME

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ...-0981; Airspace Docket No. 09-ANE-105] Revocation of Class D and E Airspace; Brunswick, ME AGENCY... and E Airspace at Brunswick NAS Airport, Brunswick, ME, as the airport has closed and the associated... Brunswick NAS Airport in Brunswick, ME has closed in compliance with the 2005 Base Realignment and Closure...

  7. Microelectronics (Electronic Devices) Research, Development, Test, and Evaluation Laboratories with DoD

    DTIC Science & Technology

    1994-04-08

    Range, New Mexico , the National Aeronautics and Space Administration Langley Research Center in Hampton, Virginia, and the Lewis Research Center in...SUBMITTED TO CONGRESS MARCH 1993 40 Appendix £. Excerpt from the Army’s Justification for DoD Base Realignment and Closure SEXt BYSASD iNLi i/Ba

  8. Evaluation of the NASA Quality Surveillance System Pilot in Meeting Requirements for Contractor Surveillance Under Performance Based Contracting

    NASA Technical Reports Server (NTRS)

    Schmahl, Karen E.

    2002-01-01

    The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

  9. Evaluation Of The NASA Quality Surveillance System Pilot In Meeting Requirements For Contractor Surveillance Under Performance Based Contracting

    NASA Technical Reports Server (NTRS)

    Schmahl, Karen E.

    2001-01-01

    The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

  10. The Impact of Osseous Malalignment and Realignment Procedures in Knee Ligament Surgery: A Systematic Review of the Clinical Evidence.

    PubMed

    Tischer, Thomas; Paul, Jochen; Pape, Dietrich; Hirschmann, Michael T; Imhoff, Andreas B; Hinterwimmer, Stefan; Feucht, Matthias J

    2017-03-01

    Failure rates of knee ligament surgery may be high, and the impact of osseous alignment on surgical outcome remains controversial. Basic science studies have demonstrated that osseous malalignment can negatively affect ligament strain and that realignment procedures may improve knee joint stability. The purpose of this review was to summarize the clinical evidence concerning the impact of osseous malalignment and realignment procedures in knee ligament surgery. The hypotheses were that lower extremity malalignment would be an important contributor to knee ligament surgery failure and that realignment surgery would contribute to increased knee stability and improved outcome in select cases. Systematic review; Level of evidence, 4. According to the PRISMA (Preferred Reporting Items for Systematic Reviews and Meta-Analyses) guidelines, a systematic electronic search of the PubMed database was performed in November 2015 to identify clinical studies investigating (A) the influence of osseous alignment on postoperative stability and/or failure rates after knee ligament surgery and (B) the impact of osseous realignment procedures in unstable knees with or without additional knee ligament surgery on postoperative knee function and stability. Methodological quality of the studies was assessed using the Oxford Centre for Evidence-Based Medicine Levels of Evidence and the Coleman Methodological Score (CMS). Of the 1466 potentially relevant articles, 28 studies fulfilled the inclusion and exclusion criteria. Average study quality was poor (CMS, 40). For part A, studies showed increased rerupture rate after anterior cruciate ligament (ACL) replacement in patients with increased tibial slope. Concerning the posterior cruciate ligament (PCL)/posterolateral corner (PLC)/lateral collateral ligament (LCL), varus malalignment was considered a significant risk factor for failure. For part B, studies showed decreased anterior tibial translation after slope-decreasing high tibial osteotomy in ACL-deficient knees. Correcting varus malalignment in PCL/PLC/LCL instability also showed increased stability and better outcomes. In cases of complex knee instability, the 3-dimensional osseous alignment of the knee should be considered (eg, mechanical weightbearing line and tibial slope). In cases of failed ACL reconstruction, the tibial slope should be considered, and slope-reducing osteotomies are often helpful in the patient revised multiple times. In cases of chronic PCL and/or PLC instability, osseous correction of the varus alignment may reduce the failure rate and is often the first step in treatment. Changes in the mechanical axis should be considered in all cases of instability accompanied by early unicompartmental osteoarthritis.

  11. The Impact of Osseous Malalignment and Realignment Procedures in Knee Ligament Surgery: A Systematic Review of the Clinical Evidence

    PubMed Central

    Tischer, Thomas; Paul, Jochen; Pape, Dietrich; Hirschmann, Michael T.; Imhoff, Andreas B.; Hinterwimmer, Stefan; Feucht, Matthias J.

    2017-01-01

    Background: Failure rates of knee ligament surgery may be high, and the impact of osseous alignment on surgical outcome remains controversial. Basic science studies have demonstrated that osseous malalignment can negatively affect ligament strain and that realignment procedures may improve knee joint stability. Hypothesis/Purpose: The purpose of this review was to summarize the clinical evidence concerning the impact of osseous malalignment and realignment procedures in knee ligament surgery. The hypotheses were that lower extremity malalignment would be an important contributor to knee ligament surgery failure and that realignment surgery would contribute to increased knee stability and improved outcome in select cases. Study Design: Systematic review; Level of evidence, 4. Methods: According to the PRISMA (Preferred Reporting Items for Systematic Reviews and Meta-Analyses) guidelines, a systematic electronic search of the PubMed database was performed in November 2015 to identify clinical studies investigating (A) the influence of osseous alignment on postoperative stability and/or failure rates after knee ligament surgery and (B) the impact of osseous realignment procedures in unstable knees with or without additional knee ligament surgery on postoperative knee function and stability. Methodological quality of the studies was assessed using the Oxford Centre for Evidence-Based Medicine Levels of Evidence and the Coleman Methodological Score (CMS). Results: Of the 1466 potentially relevant articles, 28 studies fulfilled the inclusion and exclusion criteria. Average study quality was poor (CMS, 40). For part A, studies showed increased rerupture rate after anterior cruciate ligament (ACL) replacement in patients with increased tibial slope. Concerning the posterior cruciate ligament (PCL)/posterolateral corner (PLC)/lateral collateral ligament (LCL), varus malalignment was considered a significant risk factor for failure. For part B, studies showed decreased anterior tibial translation after slope-decreasing high tibial osteotomy in ACL-deficient knees. Correcting varus malalignment in PCL/PLC/LCL instability also showed increased stability and better outcomes. Conclusion: In cases of complex knee instability, the 3-dimensional osseous alignment of the knee should be considered (eg, mechanical weightbearing line and tibial slope). In cases of failed ACL reconstruction, the tibial slope should be considered, and slope-reducing osteotomies are often helpful in the patient revised multiple times. In cases of chronic PCL and/or PLC instability, osseous correction of the varus alignment may reduce the failure rate and is often the first step in treatment. Changes in the mechanical axis should be considered in all cases of instability accompanied by early unicompartmental osteoarthritis. PMID:28451605

  12. Defense Health Care: Applying Key Management Practices Should Help Achieve Efficiencies within the Military Health System

    DTIC Science & Technology

    2012-04-01

    5. Realign the TRICARE Management Activity and establish a Joint Military Health Service Directorate to consolidate shared services and common...Directorate to consolidate shared services and common functions Realign TRICARE Management Activity and establish a TRICARE Health Plan Agency to...Uniformed Services University of the Health Sciences, (2) TRICARE health plan, (3) Health Management Support, and (4) Shared Services division

  13. Diabetes Alters Mechanical Properties and Collagen Fiber Re-Alignment in Multiple Mouse Tendons

    PubMed Central

    Connizzo, Brianne K.; Bhatt, Pankti R.; Liechty, Kenneth W.; Soslowsky, Louis J.

    2014-01-01

    Tendons function to transfer load from muscle to bone through their complex composition and hierarchical structure, consisting mainly of type I collagen. Recent evidence suggests that type II diabetes may cause alterations in collagen structure, such as irregular fibril morphology and density, which could play a role in the mechanical function of tendons. Using the db/db mouse model of type II diabetes, the diabetic skin was found to have impaired biomechanical properties when compared to the non-diabetic group. The purpose of this study was to assess the effect of diabetes on biomechanics, collagen fiber re-alignment, and biochemistry in three functionally different tendons (Achilles, supraspinatus, patellar) using the db/db mouse model. Results showed that cross-sectional area and stiffness, but not modulus, were significantly reduced in all three tendons. However, the tendon response to load (transition strain, collagen fiber re-alignment) occurred earlier in the mechanical test, contrary to expectations. In addition, the patellar tendon had an altered response to diabetes when compared to the other two tendons, with no changes in fiber realignment and decreased collagen content at the midsubstance of the tendon. Overall, type II diabetes alters tendon mechanical properties and the dynamic response to load. PMID:24833253

  14. 48 CFR 253.209-1 - Responsible prospective contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contracts, or contracts which provide for progress payments based on costs or on a percentage or stage of...) Packaging. An assessment of the prospective contractor's ability to meet all contractual packaging...)). (E) Plant safety. An assessment of the prospective contractor's ability to meet the safety...

  15. ARE TIDAL EFFECTS RESPONSIBLE FOR EXOPLANETARY SPIN–ORBIT ALIGNMENT?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Gongjie; Winn, Joshua N., E-mail: gli@cfa.harvard.edu

    The obliquities of planet-hosting stars are clues about the formation of planetary systems. Previous observations led to the hypothesis that for close-in giant planets, spin–orbit alignment is enforced by tidal interactions. Here, we examine two problems with this hypothesis. First, Mazeh and coworkers recently used a new technique—based on the amplitude of starspot-induced photometric variability—to conclude that spin–orbit alignment is common even for relatively long-period planets, which would not be expected if tides were responsible. We re-examine the data and find a statistically significant correlation between photometric variability and planetary orbital period that is qualitatively consistent with tidal interactions. Howevermore » it is still difficult to explain quantitatively, as it would require tides to be effective for periods as long as tens of days. Second, Rogers and Lin argued against a particular theory for tidal re-alignment by showing that initially retrograde systems would fail to be re-aligned, in contradiction with the observed prevalence of prograde systems. We investigate a simple model that overcomes this problem by taking into account the dissipation of inertial waves and the equilibrium tide, as well as magnetic braking. We identify a region of parameter space where re-alignment can be achieved, but it only works for close-in giant planets, and requires some fine tuning. Thus, while we find both problems to be more nuanced than they first appeared, the tidal model still has serious shortcomings.« less

  16. Business Case Analysis: Identifying Concerns for the Continuum of Care for United States Air Force Cadets with the Implementation of Base Realignment and Close Initiatives at the Air force Academy Hospital

    DTIC Science & Technology

    2006-12-31

    et al, 2003). Another reason that downsizing is a popular way in which a healthcare organization can become more efficient based on institutional ... theory . This theory states that since other hospitals have used downsizing as a means to become more efficient, so will we. This theory states that

  17. Environmental Assessment: 2005 Base Realignment and Closure Seymour Johnson Air Force Base Goldsboro, North Carolina

    DTIC Science & Technology

    2007-07-01

    clearance criteria is being prepared. Expected completion date: __ _ A temporary waiver for construction activity in the airfield vacinity was approved on...space clearance criteria is being prepared. Expected completion date: __ _ A temporary waiver for construction activity in the airfield vacinity was...construction activity in the airfield vacinity was approved on ____ (date). A permanent waiver of airfield/airspace clearance criteria was obtained on

  18. DOD Base Realignment and Closure Part 2 (BRAC 91). Department of the Air Force. FY 1997 Budget Estimates Submission. Justification Data Submitted to OSD: March 1996.

    DTIC Science & Technology

    1996-03-01

    52 10. Myrtle Beach AFB, South Carolina ................................ 55 11. Richards-Gebaur ARS, M issouri...restoration actions. MacDill. Base Closure Account requirement: $13.2 Million The funding was due to environmental and restoration actions. Myrtle Beach ...environmental costs. FY 1993: Base Closure Account Requirement: $648.7 Million. Eaker and England AFBs closed 15 December 1992. Myrtle Beach AFB closed 31

  19. Effects on G Tolerance While Biting Down on a Mandibular Orthopedic Repositioning Appliance (MORA) Levels.

    DTIC Science & Technology

    1990-10-01

    Repositioning Appliance (MORA) that properly aligns the temporo mandibular joint (TMJ) requires voluntary contraction of the masseter and temporal’s...growth, malocclusion, or bad oral posture may cause the Temporo Mandibular Joint (TMJ) to grad- ually become misaligned. The masseter and other muscles...books have been published on the use of a Mandibular Orthopedic Repositioning Appliance (MORA) to realign the joint (Figure 1). Realignment is claimed

  20. Polar advisory committee focuses on NSF realignment

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2012-11-01

    With the U.S. National Science Foundation's (NSF) realignment that moves the agency's Office of Polar Programs (OPP) back to the Directorate for Geosciences (GEO), "the emphasis on the importance of the polar program at NSF doesn't change," NSF director Subra Suresh reassured members of the federal Advisory Committee on Polar Programs during a committee meeting on 5 November. "The polar program in its entirety stays as the same entity. Nothing changes," he told committee members, regarding the realignment that began on 1 October (see Eos, 93(43), 427, doi:10.1029/2012EO430003). "Nothing changes in terms of our commitment to the polar program. Nothing changes in terms of infrastructure support. Nothing changes in terms of people in the polar program speaking for the polar program to the external world and internally. And nothing changes in terms of how individual scientists interact with the polar program."

  1. 48 CFR 52.215-23 - Limitations on Pass-Through Charges.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... indirect costs and associated profit/fee based on such costs). No or negligible value means the Contractor... value means that the Contractor performs subcontract management functions that the Contracting Officer... Contractor or subcontractor that adds no or negligible value to a contract or subcontract, means a charge to...

  2. Connections, Partnerships, Opportunities, and Programs to Enhance Success for Military Students

    ERIC Educational Resources Information Center

    Ford, Deborah; Northrup, Pamela; Wiley, Lusharon

    2009-01-01

    Active-duty personnel, reservists, veterans, and their spouses or dependents represent 30% of the 10,000 students at the University of West Florida (UWF). With base realignment activities, a rise in the number of troops returning from deployments, and an increase in military-affiliated students on campus, the needs of veterans and their families…

  3. 75 FR 61556 - Notice of Opportunity To Participate, Criteria Requirements and Application Procedure for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... realigned under the Title 10 U.S.C. Sec. 2687 (announcement of closures of large Department of Defense... pursuant to 10 U.S.C. 2687 as excess property (bases announced for closure by Department of Defense (DOD... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration [Docket No. FAA-2011-22842] Notice of...

  4. Sciences Teacher Education Curriculum Re-Alignment: "Science Education Lecturers' Perspectives of Knowledge Integration at South African Universities"

    ERIC Educational Resources Information Center

    Booi, Kwanele; Khuzwayo, Mamsie Ethel

    2018-01-01

    A qualitative case study was conducted at six purposively sampled universities; out of a population of approximately 23 universities. This sampling strategy was based on selecting some universities that became Universities of Technology during the process of merging Higher Education Institutions (HEIs) while other universities kept their identity;…

  5. 75 FR 78978 - Record of Decision for the 158th Fighter Wing's Proposed Realignment of National Guard Avenue and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... resources and personnel). The decision was based on matters discussed in the Final Environmental Impact... from the public and regulatory agencies, and other relevant factors. The Final EIS was made available... NEPA of 1969 (42 USC. 4321, et seq.) and the Air Force's Environmental Impact Analysis Process (EIAP...

  6. Dance Education Matters: Rebuilding Postsecondary Dance Education for Twenty-First Century Relevance and Resonance

    ERIC Educational Resources Information Center

    Risner, Doug

    2010-01-01

    Postsecondary dance education is at a crucial juncture in its history in academe. Emerging from women's physical education programs in the 1930s, the profession's realignment with the arts broadly and arts-based education specifically has been characterized by ambitious goals and steady growth through the 1990s. However, a number of critical…

  7. Fort Holabird Defense Investigative Service (DIS), Base Realignment and Closure (BRAC) Cleanup Plan (BCP), Version II

    DTIC Science & Technology

    1998-12-01

    3-16 3.4.7 Category 7: Areas Not Evaluated or Require Additional Evaluation .................... 3-16...Alternatives Evaluation Process for DIS Disposal and Reuse, Fort Holabird, Maryland ........ 2-6 Figure 3-1. Environmental Restoration Early Action...Requirement AREE ............... Area Requiring Environmental Evaluation AST .................. Above-ground Storage Tank BCP .................. BRAC

  8. Environmental Assessment for the Routine and Recurring Realignment of Units and Personnel at Edwards Air Force Base, California

    DTIC Science & Technology

    2014-09-01

    atmosphere. The following gases are considered the major greenhouse gases of concern: carbon dioxide, methane, nitrous oxide, and fluorinated gases...create a lead hazard. The U.S. EPA has established that paint, varnish , shellac, or other coatings on surfaces that contain more than 5,000 ppm of lead

  9. Under Secretary of Defense (Comptroller) > Budget

    Science.gov Websites

    (Comptroller) Under Secretary of Defense (Comptroller) Home About OUSD(C) OUSD(C) Top Leaders OUSD(C) Org Chart functionalStatements OUSD(C) History FMR Budget Materials Budget Execution Financial Management Improving Financial Military Construction, Family Housing, and Base Realignment and Closure Program (C-1) PDF icon Excel icon

  10. Improvement of force health protection through preventive medicine oversight of contractor support.

    PubMed

    Mower, Scott A

    2009-01-01

    Unprecedented numbers of contractors are used throughout the Iraq theater of operations to alleviate military manpower shortages. At virtually every major forward operating base, US-based contractors perform the preponderance of essential life support services. At more remote sites, local national contractors are increasingly relied upon to maintain chemical latrines, remove trash, deliver bulk water, and execute other janitorial functions. Vigorous oversight of contractor performance is essential to ensure services are delivered according to specified standards. Poor oversight can increase the risk of criminal activities, permit substandard performance, elevate disease and nonbattle injury rates, degrade morale, and diminish Soldier readiness. As the principal force health protection proponents in the Department of Defense, preventive medicine units must be tightly integrated into the oversight processes. This article defines the force health protection implications associated with service contracts and provide recommendations for strengthening preventive medicine's oversight role.

  11. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATLmore » Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.« less

  12. Evaluation of Volatilization Potential for Legacy Chlordane in Military Housing Area Soils

    DTIC Science & Technology

    2011-10-01

    chlordane, to control termites around base housing until it was banned in 1988. As bases are closed, contracted, or realigned, soil issues associated...for termite control around or under building foundations. This pesticide was used to treat many U.S. military housing units either before or after...to 1988, chlordane’s only approved use was for underground application to control termites in buildings. In 1988, all uses of chlordane in the

  13. Environmental Assessment of 2005 Base Realignment and Closure Actions at Homestead Air Reserve Base, Florida

    DTIC Science & Technology

    2007-02-01

    permit, there are no guidelines for storm water quality , therefore Homestead ARB established a program with the State of Florida to test and monitor... storm water quality . Heating and Cooling Systems. Because of the humid Florida climate, engineers are considering an installation-wide Utility... storm water quality , negligible effects on the storm water system would be expected as a result of the Proposed Action. Heating and Cooling

  14. A pattern of contractor selection for oil and gas industries in a safety approach using ANP-DEMATEL in a Grey environment.

    PubMed

    Gharedaghi, Gholamreza; Omidvari, Manouchehr

    2018-01-11

    Contractor selection is one of the major concerns of industry managers such as those in the oil industry. The objective of this study was to determine a contractor selection pattern for oil and gas industries in a safety approach. Assessment of contractors based on specific criteria and ultimately selecting an eligible contractor preserves the organizational resources. Due to the safety risks involved in the oil industry, one of the major criteria of contractor selection considered by managers today is safety. The results indicated that the most important safety criterion of contractor selection was safety records and safety investments. This represented the industry's risks and the impact of safety training and investment on the performance of other sectors and the overall organization. The output of this model could be useful in the safety risk assessment process in the oil industry and other industries.

  15. MARINE CORPS ASIA PACIFIC REALIGNMENT: DOD Should Resolve Capability Deficiencies and Infrastructure Risks and Revise Cost Estimates

    DTIC Science & Technology

    2017-04-01

    environmental mitigation and the costs associated with it. In April 2015, the Navy released a draft environmental impact statement to the public that...economic analysis for decision making indicates that, as part of assessing the costs and benefits of alternatives, an economic analysis should include...Page 48 GAO-17-415 Marine Corps Asia-Pacific Realignment comprehensive estimates of the expected costs and benefits that are incident to achieving

  16. Carbon degradation in agricultural soils flooded with seawater after managed coastal realignment

    NASA Astrophysics Data System (ADS)

    Sjøgaard, Kamilla S.; Treusch, Alexander H.; Valdemarsen, Thomas B.

    2017-09-01

    Permanent flooding of low-lying coastal areas is a growing threat due to climate change and related sea-level rise. An increasingly common solution to protect coastal areas lying below sea level is intentional flooding by "managed coastal realignment". However, the biogeochemical implications of flooding agricultural soils with seawater are still not well understood. We conducted a 1-year mesocosm experiment to investigate microbial carbon degradation processes in soils flooded with seawater. Agricultural soils were sampled on the northern coast of the island Fyn (Denmark) at Gyldensteen Strand, an area that was subsequently flooded in a coastal realignment project. We found rapid carbon degradation to TCO2 1 day after experimental flooding and onwards and microbial sulfate reduction established quickly as an important mineralization pathway. Nevertheless, no free sulfide was observed as it precipitated as Fe-S compounds with Fe acting as a natural buffer, preventing toxic effects of free sulfide in soils flooded with seawater. Organic carbon degradation decreased significantly after 6 months, indicating that most of the soil organic carbon was refractory towards microbial degradation under the anoxic conditions created in the soil after flooding. During the experiment only 6-7 % of the initial soil organic carbon pools were degraded. On this basis we suggest that most of the organic carbon present in coastal soils exposed to flooding through sea-level rise or managed coastal realignment will be permanently preserved.

  17. Neural mechanisms underlying spatial realignment during adaptation to optical wedge prisms.

    PubMed

    Chapman, Heidi L; Eramudugolla, Ranmalee; Gavrilescu, Maria; Strudwick, Mark W; Loftus, Andrea; Cunnington, Ross; Mattingley, Jason B

    2010-07-01

    Visuomotor adaptation to a shift in visual input produced by prismatic lenses is an example of dynamic sensory-motor plasticity within the brain. Prism adaptation is readily induced in healthy individuals, and is thought to reflect the brain's ability to compensate for drifts in spatial calibration between different sensory systems. The neural correlate of this form of functional plasticity is largely unknown, although current models predict the involvement of parieto-cerebellar circuits. Recent studies that have employed event-related functional magnetic resonance imaging (fMRI) to identify brain regions associated with prism adaptation have discovered patterns of parietal and cerebellar modulation as participants corrected their visuomotor errors during the early part of adaptation. However, the role of these regions in the later stage of adaptation, when 'spatial realignment' or true adaptation is predicted to occur, remains unclear. Here, we used fMRI to quantify the distinctive patterns of parieto-cerebellar activity as visuomotor adaptation develops. We directly contrasted activation patterns during the initial error correction phase of visuomotor adaptation with that during the later spatial realignment phase, and found significant recruitment of the parieto-cerebellar network--with activations in the right inferior parietal lobe and the right posterior cerebellum. These findings provide the first evidence of both cerebellar and parietal involvement during the spatial realignment phase of prism adaptation. Copyright (c) 2010 Elsevier Ltd. All rights reserved.

  18. Environmental Assessment of 2005 Base Closure and Realignment Actions at Buckley Air Force Base, Colorado

    DTIC Science & Technology

    2008-05-01

    5,500 feet in the northwestern corner of the base (BAFB 2004). Soils. Soils are the unconsolidated materials overlying bedrock or other parent ...consultation with this office. We request being invol \\l’ed in the consultation process "~th the local go\\l’crnment, which as stipulated in 36 CFR 800.3...35000 10 Bowling Center and Community Activities (Peterson)_ 5274 11 Education Center/Library 4000 11 Arts, Crafts, Auto Skills Development Ctr 2000

  19. Department of Defense Base Reuse Implementation Manual, DOD 4165.66-M

    DTIC Science & Technology

    1997-12-01

    applications? SPECIAL CONSIDERATION In the case of representatives of the homeless whose applications have been approved by HHS under Title V of the...2) In the case of installations approved for closure under a base closure law before the date of the enactment of this Act, not later than 15 days...realignment, as the case may be, of such installation under the applicable base closure law expires. (3) The term "redevelopment authority", in the case

  20. Effective Transition Management: The Seamless System

    NASA Technical Reports Server (NTRS)

    Burke, Marty

    1995-01-01

    In this age of shrinking resources, cost avoidance has become as critical as direct cost savings. There is no doubt that Effective Transition Management (ETM) achieves this aim. What then, is ETM and how does it achieve its goal? It is the introduction and use of a hierarchical decision model and computerized tracking system which successfully integrates capital acquisition into the support base. You will discover that because this proven system is generic, compatible and flexible, its applications are virtually unlimited. It is this highly dynamic process which I would like to share with you. Skilled specialists are now rotated rapidly through acquisition programs on a requirements-driven basis. Managers continue their quest for inefficient areas to trim, slash or cut. However, there is one area of operations in every major corporation and government department that, as yet, has not received the attention it deserves. This essential element is Transition Management. Capital acquisitions, at some point, must be handed off to a support matrix for the 'in-service' phase of their life cycle. Most of us who have been on the receiving end can usually cite outrageous examples of adjustment, recovery or disaster. This means buying what amounts to a second initial sparing package, re-aligning the range and depth of inventory to match a changed maintenance concept, interpreting contractor-developed configuration control data or ensuring that the latest information is contained in the technical publications. This list is endless. For major purchases, this 'in-service' phase is often fifteen, twenty or more years. The least desirable, yet most common condition, is to suffer up to five years of recovering from errors or omissions after the transition to the support matrix occurs. Without ETM, making new equipment fully operational may thus become a long and costly process.

  1. Kinematic markers dissociate error correction from sensorimotor realignment during prism adaptation.

    PubMed

    O'Shea, Jacinta; Gaveau, Valérie; Kandel, Matthieu; Koga, Kazuo; Susami, Kenji; Prablanc, Claude; Rossetti, Yves

    2014-03-01

    This study investigated the motor control mechanisms that enable healthy individuals to adapt their pointing movements during prism exposure to a rightward optical shift. In the prism adaptation literature, two processes are typically distinguished. Strategic motor adjustments are thought to drive the pattern of rapid endpoint error correction typically observed during the early stage of prism exposure. This is distinguished from so-called 'true sensorimotor realignment', normally measured with a different pointing task, at the end of prism exposure, which reveals a compensatory leftward 'prism after-effect'. Here, we tested whether each mode of motor compensation - strategic adjustments versus 'true sensorimotor realignment' - could be distinguished, by analyzing patterns of kinematic change during prism exposure. We hypothesized that fast feedforward versus slower feedback error corrective processes would map onto two distinct phases of the reach trajectory. Specifically, we predicted that feedforward adjustments would drive rapid compensation of the initial (acceleration) phase of the reach, resulting in the rapid reduction of endpoint errors typically observed early during prism exposure. By contrast, we expected visual-proprioceptive realignment to unfold more slowly and to reflect feedback influences during the terminal (deceleration) phase of the reach. The results confirmed these hypotheses. Rapid error reduction during the early stage of prism exposure was achieved by trial-by-trial adjustments of the motor plan, which were proportional to the endpoint error feedback from the previous trial. By contrast, compensation of the terminal reach phase unfolded slowly across the duration of prism exposure. Even after 100 trials of pointing through prisms, adaptation was incomplete, with participants continuing to exhibit a small rightward shift in both the reach endpoints and in the terminal phase of reach trajectories. Individual differences in the degree of adaptation of the terminal reach phase predicted the magnitude of prism after-effects. In summary, this study identifies distinct kinematic signatures of fast strategic versus slow sensorimotor realignment processes, which combine to adjust motor performance to compensate for a prismatic shift. © 2013 Elsevier Ltd. All rights reserved.

  2. Restoration of estuarine wetlands via "managed realignment": the use of natural analogues.

    NASA Astrophysics Data System (ADS)

    Cundy, A.

    2003-04-01

    A proposed management response to rising sea-levels for low-relief coastal areas is the managed-realignment approach, where existing coastal defences are repositioned landward, and protective wetlands allowed to develop on the abandoned land. This technique has been applied with varying degrees of success at a number of coastal sites, and, in the U.K. at least, its use is increasing as coastal management authorities move away from hard engineering approaches towards more "natural" coastal and floodplain management. Studies of the response of low-lying coastal areas to the managed-realignment approach, and the subsequent restoration of intertidal wetlands, have tended to rely on short-term (< 5 years) studies of erosion and accretion, vegetation change, and changes in sediment chemistry. While the short-term response to breaching is important, it is essential to complement these studies with an understanding of the medium-term (decadal) response of low-lying coasts to sudden inundation to allow effective site selection and management. This medium-term response may be assessed using sedimentary and geomorphological studies at coastal sites which have been historically breached and flooded, which provide natural analogues for the managed realignment process. This paper illustrates this approach using data from two contrasting sites in southern England (Pagham Harbour and part of the Hamble estuary), which were flooded in the early 20th century following breaching of flood defences. Sediments at both sites retain a record of environmental change following marine inundation, and sedimentary studies, combined with documentary evidence, have been used to examine post-breaching marsh stability, variations in sediment accumulation rate, and vegetation colonisation and dieback over varying timescales. Historically-breached sites such as Pagham Harbour and the Hamble estuary are relatively common around European coasts, and these provide important natural laboratories within which the medium-term coastal response to managed-realignment schemes can be assessed.

  3. Department of Defense Base Closure and Realignment Report

    DTIC Science & Technology

    1993-03-01

    European NATO allies wili continue to grapple with shaping 3n evolving regional security framework capable of crisis management and conflict prevention, as...Personnel, Arlington, Virginia (including the Office of Military Manpower Management . Arlington, Virg;uda) Naval Air Systems Command, Arlington, Virginia...Hawaii Enlisted Personnel Management Center, New Orleans, Louisiana Naval Computer & Telecommunications Station, New Orleans, Louisiana Naval Air Station

  4. Defense Industrial Base (DIB): Munitions Realignment for 2020

    DTIC Science & Technology

    2013-03-01

    munitions DIB by companies like Coca Cola , Quaker Oats, and Eastman Kodak. As industrial mobilization quickly increased, the requirements decreased...Association of Colleges and Schools, 3624 Market Street, Philadelphia, PA 19104, (215) 662-5606. The Commission on Higher Education is an institutional...Colleges and Schools, 3624 Market Street, Philadelphia, PA 19104, (215) 662-5606. The Commission on Higher Education is an institutional accrediting

  5. Nanotechnology and the Developing World: Lab-on-Chip Technology for Health and Environmental Applications

    ERIC Educational Resources Information Center

    Mehta, Michael D.

    2008-01-01

    This article argues that advances in nanotechnology in general, and lab-on-chip technology in particular, have the potential to benefit the developing world in its quest to control risks to human health and the environment. Based on the "risk society" thesis of Ulrich Beck, it is argued that the developed world must realign its science and…

  6. 75 FR 23747 - Notice of Availability (NOA) of the Draft Environmental Impact Statement for the Disposal and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... Public Hearings AGENCY: Department of the Navy, DoD. ACTION: Notice. SUMMARY: Pursuant to Section 102(2... per Public Law 101-510, the Defense Base Closure and Realignment Act of 1990, as amended in 2005. Public hearings will be held to provide information and receive oral and written comments on the Draft...

  7. Productive mRNA stem loop-mediated transcriptional slippage: Crucial features in common with intrinsic terminators.

    PubMed

    Penno, Christophe; Sharma, Virag; Coakley, Arthur; O'Connell Motherway, Mary; van Sinderen, Douwe; Lubkowska, Lucyna; Kireeva, Maria L; Kashlev, Mikhail; Baranov, Pavel V; Atkins, John F

    2015-04-21

    Escherichia coli and yeast DNA-dependent RNA polymerases are shown to mediate efficient nascent transcript stem loop formation-dependent RNA-DNA hybrid realignment. The realignment was discovered on the heteropolymeric sequence T5C5 and yields transcripts lacking a C residue within a corresponding U5C4. The sequence studied is derived from a Roseiflexus insertion sequence (IS) element where the resulting transcriptional slippage is required for transposase synthesis. The stability of the RNA structure, the proximity of the stem loop to the slippage site, the length and composition of the slippage site motif, and the identity of its 3' adjacent nucleotides (nt) are crucial for transcripts lacking a single C. In many respects, the RNA structure requirements for this slippage resemble those for hairpin-dependent transcription termination. In a purified in vitro system, the slippage efficiency ranges from 5% to 75% depending on the concentration ratios of the nucleotides specified by the slippage sequence and the 3' nt context. The only previous proposal of stem loop mediated slippage, which was in Ebola virus expression, was based on incorrect data interpretation. We propose a mechanical slippage model involving the RNAP translocation state as the main motor in slippage directionality and efficiency. It is distinct from previously described models, including the one proposed for paramyxovirus, where following random movement efficiency is mainly dependent on the stability of the new realigned hybrid. In broadening the scope for utilization of transcription slippage for gene expression, the stimulatory structure provides parallels with programmed ribosomal frameshifting at the translation level.

  8. Report on audit of Department of Energy`s contractor salary increase fund

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-04

    The Department of Energy (Department) uses contractors to operate its facilities and compensates contractor employees based on their skills, complexity of jobs, and work performance. Thirty-one of the Department`s major contractors reported a total payroll of $4.3 billion and $4.4 billion during 1994 and 1995, respectively. The 31 contractors also reported awarding salary increases of $18 million for 1994 and $200 million for 1995. The purpose of the audit was to review the process used to determine and approve the amount of salary increases for contractor employees. The specific audit objective was to determine whether salary increases received by contractormore » employees were in accordance with Departmental policies and procedures. The Department of Energy Acquisition Regulation (DEAR) requires that contractor salary actions be within specific limitations, supportable, and approved prior to incurrence of costs. In addition, the Secretary of Energy imposed a 1 year salary freeze on the merit portion of management and operating contractor employee salaries for each contractor`s Fiscal Year 1994 compensation year. However, a fund for promotions and adjustments was approved but limited to 0.5 percent of payroll for the year. A review of eight major contractors showed that six complied with the Department`s policies on salary increases. The other two gave salary increases that were not always in accordance with Departmental policies. This resulted in both contractors not fully complying with the pay freeze in 1994 and exceeding their salary increase fund budgets in 1995. If these two contractors had implemented Department and contract requirements and contracting officers had properly performed their contract administrative responsibilities concerning salary increase funds, both contractors would have frozen salary increases and would not have exceeded their annual budgets.« less

  9. Department of the Air Force FY 1994 Budget Estimates, DoD Base Realignment and Closure. Part 2. Justification Data Submitted to Congress: April 1993

    DTIC Science & Technology

    1993-04-01

    AFB, Colorado .................................. 74 9. MacDill AFB, Florida ................................. 89 10. Myrtle Beach AFB, South Carolina...The funding is primarily related to environmental and restoration actions. Myrtle Beach . Base Closure Account requirement: $29.1 Million The funding...1993: Eaker and England AFBs closed 15 December 1992. Myrtle Beach AFB closed 31 March 1993. Bergstrom, Carswell, Williams and Wurtsmith AFBs will close

  10. Defending the Homeland Path of Missile Defense Development full of Ups and Downs

    DTIC Science & Technology

    2007-01-01

    confrontation. The fi rst anti-ballistic missile system to emerge from the technological and political turmoil was the Nike -Zeus system. Elements of...after a base realignment and closure. A small group of Soldiers began training on the system in Colorado Springs, Colorado, future location of the...Force Base, Calif. — the fi rst for this location , which would be primarily used for testing. Since 2002, the U.S. has been discussing the possibility

  11. Pelvic fracture urethral injuries: evaluation of various methods of management.

    PubMed

    Koraitim, M M

    1996-10-01

    The results of various immediate treatments of urethral injuries complicating a fractured pelvis were evaluated. The records of 100 male patients with pelvic fracture urethral injury were reviewed, 73 of whom were treated by suprapubic cystostomy and delayed repair, 23 by primary realignment and 4 by primary suturing. Also, the findings of 771 patients reported in the literature were reviewed. Urethral stricture was an almost inevitable consequence (97% of the cases) after suprapubic cystostomy. Primary realignment decreased the incidence of stricture to 53% but produced a 36% impotence rate. Primary suturing also decreased the incidence of stricture to 49% but produced the greatest complication rates for impotence (56%) and incontinence (21%). Suprapubic cystostomy alone is indicated for incomplete urethral rupture, slight urethral distraction and critically unstable patients, and when there are inadequate facilities or inexperienced surgeons. Primary realignment is advised if there is wide separation of the urethral ends, or associated injury of the bladder neck or rectum. Primary suturing is not recommended for any condition.

  12. "I didn't feel like I was a person anymore": realigning full adult personhood after ostomy surgery.

    PubMed

    Ramirez, Michelle; Altschuler, Andrea; McMullen, Carmit; Grant, Marcia; Hornbrook, Mark; Krouse, Robert

    2014-06-01

    Colorectal cancer (CRC) is the third most common cancer in the United States. For some CRC patients, cancer treatment involves creating a permanent or temporary intestinal ostomy. Having an ostomy often results in complex social and physical concerns-including unpredictable and at times publicly noticeable bowel output. In this article, we discuss findings from 30 in-depth interviews with female CRC survivors with ostomies in the western United States. We highlight how having an ostomy disrupts culturally sanctioned practices of continence that mark the attainment of full-adult personhood. We discuss how survivors reclaim a sense of full personhood after ostomy surgery through a process of realignment that entails both learning how to manage ostomy equipment to conceal bowel activity and reappraising their illness and suffering. We suggest that the anthropological categories of personhood and personhood realignment be incorporated into research and interventions aimed at increasing support among cancer survivors living with bodily impairments. © 2014 by the American Anthropological Association.

  13. “I Didn’t Feel Like I Was a Person Anymore”: Realigning Full Adult Personhood after Ostomy Surgery

    PubMed Central

    Ramirez, Michelle; Altschuler, Andrea; McMullen, Carmit; Grant, Marcia; Hornbrook, Mark; Krouse, Robert

    2016-01-01

    Colorectal cancer (CRC) is the third most common cancer in the United States. For some CRC patients, cancer treatment involves creating a permanent or temporary intestinal ostomy. Having an ostomy often results in complex social and physical concerns—including unpredictable and at times publicly noticeable bowel output. In this article, we discuss findings from 30 in-depth interviews with female CRC survivors with ostomies in the western United States. We highlight how having an ostomy disrupts culturally sanctioned practices of continence that mark the attainment of full-adult personhood. We discuss how survivors reclaim a sense of full personhood after ostomy surgery through a process of realignment that entails both learning how to manage ostomy equipment to conceal bowel activity and reappraising their illness and suffering. We suggest that the anthropological categories of personhood and personhood realignment be incorporated into research and interventions aimed at increasing support among cancer survivors living with bodily impairments. PMID:24782269

  14. Providing Family Planning Services at Primary Care Organizations after the Exclusion of Planned Parenthood from Publicly Funded Programs in Texas: Early Qualitative Evidence.

    PubMed

    White, Kari; Hopkins, Kristine; Grossman, Daniel; Potter, Joseph E

    2017-10-20

    To explore organizations' experiences providing family planning during the first year of an expanded primary care program in Texas. Between November 2014 and February 2015, in-depth interviews were conducted with program administrators at 30 organizations: 7 women's health organizations, 13 established primary care contractors (e.g., community health centers, public health departments), and 10 new primary care contractors. Interviews addressed organizational capacities to expand family planning and integrate services with primary care. Interview transcripts were analyzed using a theme-based approach. Themes were compared across the three types of organizations. Established and new primary care contractors identified several challenges expanding family planning services, which were uncommon among women's health organizations. Clinicians often lacked training to provide intrauterine devices and contraceptive implants. Organizations often recruited existing clients into family planning services, rather than expanding their patient base, and new contractors found family planning difficult to integrate because of clients' other health needs. Primary care contractors frequently described contraceptive provision protocols that were not evidence-based. Many primary care organizations in Texas initially lacked the capacity to provide evidence-based family planning services that women's health organizations already provided. © Health Research and Educational Trust.

  15. Environmental Impact Analysis Process. Environmental Impact Statement for Realignment of Beale Air Force Base

    DTIC Science & Technology

    1990-04-01

    CONTACTED .......... 6-2 APPENDIX A.- Average Daily Air Emissions Inventory for Yuba County .............................. A-1 APPENDIX B...Civilian Wage and Salary Employment, Yuba City Metropolitan Statistical Area, 1987 (Yuba and Sutter Counties , CA) ................... 3-46 vii LIST OF...Beale AFB Students Enrolled in Yuba and Sutter County Public Schools, FY 1989-90, by Assistance Category and School Capacity ................... 3-50 4

  16. Base Realignment and Closure Environmental Evaluation (BRAC EE) Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-09-01

    Not Sampled ......... 6 2.3.2 Transformer Sites Sampled ........................ 7 2.4 Soil Sampling Protocol and Analytical Program ...Evaluation (AREE) 66. The study included evaluating the current PCB Transformer Management Program administered by the Fort Devens Environmental Management...Office (EMO), the Fort Devens Spill Contingency Plan, and the ongoing transformer inspection program . Personnel in both the Fort Devens EMO and the Fort

  17. A Comparative History of Department of Defense Management Reform from 1947 to 2005

    DTIC Science & Technology

    2006-12-01

    type of management reform agenda to improve the Department of Defense business processes and incorporate recent management ideas from the business ...introduce some type of management reform agenda to improve the Department of Defense business processes and incorporate recent management ideas...Steering Group BMMP Business Management Modernization Plan BRAC Base Realignment and Closure C3I Command, Control, Communications, and Intelligence

  18. Report on 2005 Defense Base Closure and Realignment Implementation

    DTIC Science & Technology

    2011-09-01

    been agreed to by the redevelopment authority? Yes Description of redevelopment plan: Education Conveyance to Texarkana College. Quantity of...1993 1998 2008 1995 2014 2014 2002 2016 2010 2011 2012 20252013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2024...1996 2001 2008 2008 1990 2008 2008 2008 2010 2011 2012 20252013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2024

  19. Army Base Realignment Methodology. Volume II.

    DTIC Science & Technology

    1981-08-01

    deficien- cies because they were reconstructed after the fact. c. The Craig action was very similar to the Fort Wolters closure. It was completed ...7 / provided cross-checks on the Fort Wolters After Action Report and substantiated the completion of equipment shipments and proposed construction...DATES AND MILESTONES OF USAMPS RELOCATIONA / Event Date CSJF completed --USAMPS relocation to Fort Devens not justified 22 July 1971 Criminal

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Melancon, R.

    In June, 1995, the National Petroleum Refiners Association (NPRA) adhoc committee on Contractor Safety Training, turned over the task of developing reciprocity agreements with all Contractor Safety Training Councils to the Executive Directors of each of the Council`s. The Council representatives were to develop these agreements based on the NPRA adhoc committee training objectives that were developed jointly by representatives of the petroleum industry, chemical industry, contractors and the Council`s.

  1. Analysis of non-fatal and fatal injury rates for mine operator and contractor employees and the influence of work location.

    PubMed

    Karra, Vijia K

    2005-01-01

    Mining injury surveillance data are used as the basis for assessing the severity of injuries among operator and contractor employees in the underground and surface mining of various minerals. Injury rates during 1983-2002 derived from Mine Safety and Health Administration (MSHA) database are analyzed using the negative binomial regression model. The logarithmic mean injury rate is expressed as a linear function of seven indicator variables representing Non-Coal Contractor, Metal Operator, Non Metal Operator, Stone Operator, Sand and Gravel Operator, Coal Contractor, and Work Location, and a continuous variable, RelYear, representing the relative year starting with 1983 as the base year. Based on the model, the mean injury rate declined at a 1.69% annual rate, and the mean injury rate for work on the surface is 52.53% lower compared to the rate for work in the underground. With reference to the Coal Operator mean injury rate: the Non-Coal Contractor rate is 30.34% lower, the Metal Operator rate is 27.18% lower, the Non-Metal Operator rate is 37.51% lower, the Stone Operator rate is 23.44% lower, the Sand and Gravel Operator rate is 16.45% lower, and the Coal Contractor rate is 1.41% lower. Fatality rates during the same 20 year period are analyzed similarly using Poisson regression model. Based on this model, the mean fatality rate declined at a 3.17% annual rate, and the rate for work on the surface is 64.3% lower compared to the rate for work in the underground. With reference to the Coal Operator mean fatality rate: the Non-Coal Contractor rate is 234.81% higher, the Metal Operator rate is 5.79% lower, the Non-Metal Operator rate is 47.36% lower, the Stone Operator rate is 8.29% higher, the Sand and Gravel Operator rate is 60.32% higher, and the Coal Contractor rate is 129.54% higher.

  2. Final Environmental Impact Statement (FEIS)/Final Environmental Impact Report (FEIR). Otis Air National Guard Base, Wastewater Treatment Facility

    DTIC Science & Technology

    1990-06-01

    and G.E. Ness, 1982, Survival of Vibrio cholerae and Escherichia coli in Estuarine Water and Sediments, Applied and Environmental Microbiology, 43...and publications in areas of water and wastewater treatment. David Tomasko, Ph.D., 1985. University of New Mexico . Staff Hydrogeologist. Research...Reserve in California. We are working on EIS’s for the U.S. Air Force Base Closings in realignment in California, New Mexico and Washington, and a very

  3. 'There is no turning back'--is AFIP facing demise?

    PubMed

    Seckinger, Daniel

    2005-08-01

    The U.S. Department of Defense has recommended that Walter Reed Army Medical Center, home of the Armed Forces Institute of Pathology, be relocated and that the AFIP's constituent parts be eliminated or, in the case of its tissue repository, warehoused. CAP past resident Daniel Seckinger, MD, chairman of the board of the American Registry of athology, testified July 7 before the Defense Base Closure and Realignment Commission its public hearing on military base closings. His statement appears here.

  4. Final Environmental Assessment Realignment of Jenkins Armed Forces Reserve Center (AFRC), Kirtland Air Force Base, New Mexico, BRAC 2005

    DTIC Science & Technology

    2007-05-01

    cryptoleucus Northern mockingbird Mimus polyglottos Black-throated sparrow Amphispiza bilineata Eastern meadowlark Sturnella magna House finch...Americans- and ealii~ kills 5,000 each year. :ses1 The network combines nub lie e sJ\\ awareness with an Internet- based information service and -qnd...scientists agree that p;roper cooking · will kill HEAL:: s most kinds of harmful bacteria, nobody is convinced that the bulk of consumers know what

  5. Environmental Assessment Installation Development and Base Realignment and Closure Actions

    DTIC Science & Technology

    2007-01-01

    T -6 Basing and Operation ( T -6 E A). T he FONSl for the T -6 E A was s igned June 6. 2004. Constm ction...training and a ircraft operations up to the levels assessed in the T -6 E A. JFf program T -3 8 a ircrews would use the Navy’ s N ox ubee County Target... operations wi ll occur at the max imum stu dent pi lo t production levels assessed in the T -6 EA. T he max imum base populat ion wi ll be 7,47

  6. Quality based prequalification of contractors

    DOT National Transportation Integrated Search

    2001-08-01

    This report summarizes the efforts to provide the Kentucky Transportation Cabinet with a system for evaluating the quality of the performance of contractors on highway construction projects and using that evaluation in the Cabinet's annual prequalifi...

  7. Performance-Based Contractor Prequalification as an Alternative to Performance Bonds

    DOT National Transportation Integrated Search

    2014-08-01

    State departments of transportation rely on private industry construction contractors to build, rehabilitate, and replace their infrastructure assets. The Federal Highway Administration (FHWA) is interested in providing guidance that State transporta...

  8. Cerebellar cathodal tDCS interferes with recalibration and spatial realignment during prism adaptation procedure in healthy subjects.

    PubMed

    Panico, Francesco; Sagliano, Laura; Grossi, Dario; Trojano, Luigi

    2016-06-01

    The aim of this study is to clarify the specific role of the cerebellum during prism adaptation procedure (PAP), considering its involvement in early prism exposure (i.e., in the recalibration process) and in post-exposure phase (i.e., in the after-effect, related to spatial realignment). For this purpose we interfered with cerebellar activity by means of cathodal transcranial direct current stimulation (tDCS), while young healthy individuals were asked to perform a pointing task on a touch screen before, during and after wearing base-left prism glasses. The distance from the target dot in each trial (in terms of pixels) on horizontal and vertical axes was recorded and served as an index of accuracy. Results on horizontal axis, that was shifted by prism glasses, revealed that participants who received cathodal stimulation showed increased rightward deviation from the actual position of the target while wearing prisms and a larger leftward deviation from the target after prisms removal. Results on vertical axis, in which no shift was induced, revealed a general trend in the two groups to improve accuracy through the different phases of the task, and a trend, more visible in cathodal stimulated participants, to worsen accuracy from the first to the last movements in each phase. Data on horizontal axis allow to confirm that the cerebellum is involved in all stages of PAP, contributing to early strategic recalibration process, as well as to spatial realignment. On vertical axis, the improving performance across the different stages of the task and the worsening accuracy within each task phase can be ascribed, respectively, to a learning process and to the task-related fatigue. Copyright © 2016 Elsevier Inc. All rights reserved.

  9. HOW THE MILITARY CAN INTEGRATE UNMANNED AERIAL SYSTEMS IN THE CIVIL RESERVE AIR FLEET

    DTIC Science & Technology

    2016-10-01

    brings new capabilities and continues to fundamentally impact military doctrine and strategy, particularly in how civilian operators or contractors ...missions has stretched military personnel and resources thin. General Atomics, a California-based defense contractor , produces the highly successful MQ-1...and a large number of support personnel required to operate UAS missions. An already established civilian contractor presence AU/ACSC/2016 5

  10. Performance-Based Contractor Prequalification as an Alternative to Performance Bonds [Tech Brief

    DOT National Transportation Integrated Search

    2014-01-01

    State transportation departments must rely on private industry construction contractors to build, rehabilitate, and replace their infrastructure assets. The Federal Highway Administration (FHWA) is interested in ensuring that State transportation dep...

  11. The Influence of Preprocessing Steps on Graph Theory Measures Derived from Resting State fMRI

    PubMed Central

    Gargouri, Fatma; Kallel, Fathi; Delphine, Sebastien; Ben Hamida, Ahmed; Lehéricy, Stéphane; Valabregue, Romain

    2018-01-01

    Resting state functional MRI (rs-fMRI) is an imaging technique that allows the spontaneous activity of the brain to be measured. Measures of functional connectivity highly depend on the quality of the BOLD signal data processing. In this study, our aim was to study the influence of preprocessing steps and their order of application on small-world topology and their efficiency in resting state fMRI data analysis using graph theory. We applied the most standard preprocessing steps: slice-timing, realign, smoothing, filtering, and the tCompCor method. In particular, we were interested in how preprocessing can retain the small-world economic properties and how to maximize the local and global efficiency of a network while minimizing the cost. Tests that we conducted in 54 healthy subjects showed that the choice and ordering of preprocessing steps impacted the graph measures. We found that the csr (where we applied realignment, smoothing, and tCompCor as a final step) and the scr (where we applied realignment, tCompCor and smoothing as a final step) strategies had the highest mean values of global efficiency (eg). Furthermore, we found that the fscr strategy (where we applied realignment, tCompCor, smoothing, and filtering as a final step), had the highest mean local efficiency (el) values. These results confirm that the graph theory measures of functional connectivity depend on the ordering of the processing steps, with the best results being obtained using smoothing and tCompCor as the final steps for global efficiency with additional filtering for local efficiency. PMID:29497372

  12. Preoperative planning and intraoperative technique for accurate realignment of the Dwyer calcaneal osteotomy.

    PubMed

    Lamm, Bradley M; Gesheff, Martin G; Salton, Heather L; Dupuis, Travis W; Zeni, Ferras

    2012-01-01

    The Dwyer calcaneal osteotomy is an effective procedure for the correction of calcaneal varus deformity. However, no intraoperative method has been described to determine the amount of bone resection. We describe a simple intraoperative method for assuring accurate bone resection and measure the realignment effects of the Dwyer calcaneal osteotomy. We also review radiographic outcomes associated with 20 Dwyer calcaneal osteotomies (in 17 patients) using the intraoperative realignment technique described in this report. Preoperative and postoperative radiographs at a mean of 2.5 (range 1.5 to 5) years taken after Dwyer osteotomy were measured and compared, which revealed a mean reduction in calcaneal varus of 18° (range 2° to 36°) (p < .001), a mean decrease in the calcaneal inclination angle of 5° (range -40° to 7°) (p < .05), a mean decrease in medial calcaneal translation of 10 (range 0 to 18) mm (p < .001) relative to the tibia, and a mean dorsal translation of 2 (range 0 to 7) mm (p = .002). In an effort to attempt to structurally realign the calcaneus to a more rectus alignment, by means of Dwyer osteotomy, we recommend the use of the intraoperative bone wedge resection technique described in this report. Our experience with the patients described in this report demonstrates the usefulness of the intraoperative method that we describe in order to accurately restore the axial tibial and calcaneal relationship. Copyright © 2012 American College of Foot and Ankle Surgeons. Published by Elsevier Inc. All rights reserved.

  13. The Influence of Preprocessing Steps on Graph Theory Measures Derived from Resting State fMRI.

    PubMed

    Gargouri, Fatma; Kallel, Fathi; Delphine, Sebastien; Ben Hamida, Ahmed; Lehéricy, Stéphane; Valabregue, Romain

    2018-01-01

    Resting state functional MRI (rs-fMRI) is an imaging technique that allows the spontaneous activity of the brain to be measured. Measures of functional connectivity highly depend on the quality of the BOLD signal data processing. In this study, our aim was to study the influence of preprocessing steps and their order of application on small-world topology and their efficiency in resting state fMRI data analysis using graph theory. We applied the most standard preprocessing steps: slice-timing, realign, smoothing, filtering, and the tCompCor method. In particular, we were interested in how preprocessing can retain the small-world economic properties and how to maximize the local and global efficiency of a network while minimizing the cost. Tests that we conducted in 54 healthy subjects showed that the choice and ordering of preprocessing steps impacted the graph measures. We found that the csr (where we applied realignment, smoothing, and tCompCor as a final step) and the scr (where we applied realignment, tCompCor and smoothing as a final step) strategies had the highest mean values of global efficiency (eg) . Furthermore, we found that the fscr strategy (where we applied realignment, tCompCor, smoothing, and filtering as a final step), had the highest mean local efficiency (el) values. These results confirm that the graph theory measures of functional connectivity depend on the ordering of the processing steps, with the best results being obtained using smoothing and tCompCor as the final steps for global efficiency with additional filtering for local efficiency.

  14. Department of the Navy FY 1995 Budget Estimates, DoD Base Realignment and Closure Program III (1993 Commission), Justification Data Submitted to Congress February 1994

    DTIC Science & Technology

    1994-02-01

    25807 - 26426 -77435 Civilian ES (End Strength) [ 0 J [ -1005 J [ -2116 ] [ -2116 ] -2116 ] -2116 Military ES(EndStrength) [ 0 J -26 ] [ -26 ] [ -26...Operation & Maintenance 6650 57319 78458 48179 -50095 -51298 -7145 Military Personnel 0 0 0 0 0 0 0 Other 0 0 0 -25202 -25807 - 26426 -77435 Land Sales

  15. Tier One: Draft Environmental Impact Statement. Volume 1. Realignment of Mountain Home Air Force Base and Proposed Expanded Range Capability

    DTIC Science & Technology

    1990-02-01

    one of the most valuable assets in the Air Force inventory . This Tier 1 EIS is one tool designed to contribute to the decisionmaking process. The...M3.2-7 M3.2.5 Emission Inventories ...M3.5.3.2 Prehistoric Archaeological Resource Inventory ........................................................... M3.5-4 M3.5.4 Historic and Architectural

  16. AFMC Civilian Retention: Forecasting Policy on the Future of the Civilian Workforce

    DTIC Science & Technology

    2006-03-01

    encourage the expansion of flexible work schedules, job sharing, part-time employment , alternative work schedules, telecommuting , and satellite work...Daft & Steers, 1986). If a person is not receiving the same perceived benefits as another, he may feel inequity which leads to dissatisfaction (Daft... drawbacks were that the commission worked in a vacuum without guidance and faulty data. The Defense Base Closure and Realignment Act of 1990

  17. Environmental Impact Statement for Realignment of Beale Air Force Base, California

    DTIC Science & Technology

    1990-07-01

    California Department of Fish and Game CEQ Council of Environmental Quality CERCLA Comprehensive Environmental Response, Compensation, and Liability Act...housing can be developed on government-owned land only with special permission of the Secretary of the Air Force, permission that is infrequently...was not measured in other drainage systems at Beale AFB; however, it can be assumed to have similar characteristics to those reported for Hutchinson

  18. Base Realignment and Closure (BRAC) Cleanup Plan

    DTIC Science & Technology

    1995-01-01

    remedial action (RA). A number of restoration-related compliance activities at Cameron Station have also been completed or are ongoing. These include...from the identification stage to completion of remedial actions and development of NFRAP documentation. Table 3-2 also lists the study area...5 4.1.3.2 Remediation Timelines and Documents ............. 4-6 4.1.4 Environmental Restoration Early Actions Strategy ........... 4-10 4.1.5 Remedy

  19. Impacts of Severe Weather, Climate Zone, and Energy Factors on Base Realignment and Closure (BRAC)

    DTIC Science & Technology

    2015-03-26

    hydroelectric, solar photovoltaic , and wind power . Aside from locations and facilities that use electricity to heat, natural gas is the only...have large photovoltaic solar arrays with unique buy-back contracts or power -purchase agreements. These renewable energy projects benefit primarily...these costs, a Monte Carlo simulation is used to forecast annual costs and account for uncertainty with tornado and hurricane risks, along with

  20. Summary Report - Inspections of DoD Facilities and Military Housing and Audits of Base Operations and Support Services Contracts

    DTIC Science & Technology

    2016-10-14

    not holding contractors accountable for poor performance while constructing and maintaining facilities. These systemic problems resulted in...portfolio was about $880 billion at the end of FY 2015. Between 2003 and 2008, 18 U.S. military and contractor personnel electrocution fatalities...maintenance of DoD facilities. For instance, Report No. DODIG-2013-099 stated that installations “lacked qualified Government or contractor electricians

  1. Veterans’ Health Care: Improved Oversight of Community Care Physicians Credentials Needed

    DTIC Science & Technology

    2016-09-01

    Physicians’ Credentials Needed What GAO Found GAO found that the Department of Veterans Affairs’ (VA) contractors —Health Net Federal Services (Health...program, but were deficient in doing so under another program. Based on GAO’s review of selected physicians, GAO found that the contractors almost...program consistent with the requirements of the contract. In contrast, the contractors did not always verify credentials of the physicians in the

  2. Tapping Transaction Costs to Forecast Acquisition Cost Breaches

    DTIC Science & Technology

    2016-01-01

    Diameter Bomb Increment II (SDB II) Space Based Infrared System (SBIRS) High Program Standard Missile (SM) - 2 Block IV Stryker Family of Vehicles...some limitations. First, the activities included in this category will vary somewhat from contractor to contractor. As a result, a small portion of...contract may vary over time as new costs are defined by the contractor as being related to SE/PM. This could explain a small portion of the increase in

  3. Plans for Assessing Contractor Performance for the Camp Lemonnier Base Operations Support Contract Needed Improvement

    DTIC Science & Technology

    2015-08-27

    ensure the functional assessment plans ( FAP ) for the three services contained all contractor work requiring assessment, measurable performance...review the FAPs after development and revisions to the FAPs , and did not require additional controls over the contractor assessment process in an...revised as follows: • Business Management System B-14.3 was updated to require the contract officer representative conduct a FAP review to ensure

  4. Summary Report of the Seventh Annual NASA/Contractors Conference on Quality and Productivity: "Total Quality Leadership"

    NASA Technical Reports Server (NTRS)

    1991-01-01

    More than 750 NASA, government, contractor, and academic representatives attended the Seventh Annual NASA/Contractors Conference on Quality and Productivity on October 12-13, 1990, in Grenelefe, Florida. The panel presentations and keynote speeches revolving around the theme of 'Total Quality Leadership" provided a solid base of understanding of the importance, benefits, and principles of total quality management. The implementation of these strategies is critical if we are to effectively pursue our mission of continuous quality improvement and reliability in our products, processes, and services. The annual NASA/contractors conferences serve as catalysts for achieving success in this mission.

  5. 75 FR 33237 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... from DCMA insurance/pension specialists and DCAA auditors, determines a CIPR is needed based on a risk... needs to follow up on contractor implementation of prior CIPR recommendations. (c) The DCAA auditor...

  6. The long view: how the financial downturn will change health care.

    PubMed

    Moore, Keith; Coddington, Dean; Byrne, Deirdre

    2009-01-01

    There are five reasons that today's economic downturn will have a much broader impact on U.S. health care than did past recessions: This downturn is likely to be more severe and last longer. Healthcare organizations are experiencing problems from several directions simultaneously. Healthcare organizations entered this downturn more heavily leveraged and more vulnerable. This downturn is notjust a recession, but a major realignment for financing practices. As the realignment occurs and the new financing order sorts itself out, healthcare organizations are not likely to receive the favorable treatment they had in the past.

  7. Unsuccessful outcomes after posterior urethroplasty.

    PubMed

    Engel, Oliver; Fisch, Margit

    2015-03-01

    Posterior urethroplasty is the most common strategy for the treatment of post-traumatic urethral injuries. Especially in younger patients, post-traumatic injuries are a common reason for urethral strictures caused by road traffic accidents, with pelvic fracture or direct trauma to the perineum. In many cases early endoscopic realignment is the first attempt to restore the junction between proximal and distal urethra, but in some cases primary realignment is not possible or not enough to treat the urethral injury. In these cases suprapubic cystostomy alone and delayed repair by stricture excision and posterior urethroplasty is an alternative procedure to minimise the risk of stricture recurrence.

  8. Factors and values of willingness to pay for improved construction waste management--a perspective of Malaysian contractors.

    PubMed

    Begum, Rawshan Ara; Siwar, Chamhuri; Pereira, Joy Jacqueline; Jaafar, Abdul Hamid

    2007-01-01

    Malaysia is facing an increase in the generation of waste and of accompanying problems with the disposal of this waste. In the last two decades, extensive building and infrastructure development projects have led to an increase in the generation of construction waste material. The construction industry has a substantial impact on the environment, and its environmental effects are in direct relation to the quality and quantity of the waste it generates. This paper discusses general characteristics of the construction contractors, the contractors' willingness to pay (WTP) for improved construction waste management, determining factors which affect the amount of their willingness to pay, and suggestions and policy implications in the perspective of construction waste management in Malaysia. The data in this study is based on contractors registered with the construction industry development board (CIDB) of Malaysia. Employing the open ended contingent valuation method, the study assessed the contractors' average maximum WTP for improved construction waste management to be RM69.88 (1US$=3.6 RM) per tonne of waste. The result shows that the average maximum WTP is higher for large contractors than for medium and small contractors. The highest average maximum WTP value is RM88.00 for Group A (large contractors) RM78.25 for Group B (medium-size contractors) and RM55.80 for Group C (small contractors). One of the contributions of this study is to highlight the difference of CIDB registration grade in the WTP for improved construction waste management. It is found that contractors' WTP for improved waste collection and disposal services increases with the increase in contractors' current paid up capital. The identified factors and determinants of the WTP will assist the formulation of appropriate policies in addressing the construction waste problem in Malaysia and indirectly improve the quality of construction in the country.

  9. 48 CFR 52.232-32 - Performance-Based Payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... is endangered by the Contractor's (i) failure to make progress, or (ii) unsatisfactory financial... title; (iii) Nondurable (i.e., noncapital) tools, jigs, dies, fixtures, molds, patterns, taps, gauges... Government access. The Contractor shall promptly furnish reports, certificates, financial statements, and...

  10. 48 CFR 45.000 - Scope of part.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Government has acquired a lien or title solely because of partial, advance, progress, or performance-based... Section 45.000 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT... Government property to contractors, contractors' management and use of Government property, and reporting...

  11. ACHP | Working Together to Build a More Inclusive Preservation Program

    Science.gov Websites

    Manager. He has over a decade of experience in the construction industry as a contractor and project working on my Masters, I was employed by an Athens, GA-based general contractor who specialized in

  12. Base Realignment and Closure (BRAC) Cleanup Plan for Fort Devens, Fort Devens, Massachusetts

    DTIC Science & Technology

    1994-04-07

    Landfill (AOCs 4, 5, 18, and 40) were identified in the MEP as the highest priority (Priority 1A) for remediation. As such, these sites proceeded...Spring Brook Landfills OUs, etc. 4.1.4 Environmental Restoration Early Actions Strategy The Site Investigation (SI) Data Package concept was developed...Approach for the Shepley’ s Hill and Cold Spring Brook Landfill Sites . Fort Devens. Massachusetts, prepared for USAEC; February. Ecology & Environment

  13. U.S. Global Defense Posture, 1783-2011

    DTIC Science & Technology

    2012-01-01

    in global affairs to further the nation’s interests. Second, as a consequence of its victory in the Spanish -American War of 1898, the United States...planning process . Despite their importance, the Pentagon needs to ensure that its global defense posture is developed from a top-down, not a bottom-up...to the continental United States (CONUS) or leaving it, both of which have implications for the base realignment and closure process . Despite this

  14. Department of the Navy FY 1993 Budget Estimates, DoD Base Closure and Realignment Program 2. Justification Data Submitted to Congress January 1992

    DTIC Science & Technology

    1992-01-01

    DESIGN WAS MOST RECENTLY USED: (3) TOTAL COST (C) - (A) + (B) OR (0) + ( E ): (SO0O) (A) PRODUCTION OF PLANS AND SPECIFICATIONS ......... _1: (B) ALL... E ) IN-HOUSE . . . . . . . . . . . . . . . . . . . . . . . . (4) CONSTRUCTION START .................... .. - (MONTH AND...Z. (2) BASIS: (A) STANDARD OR DEFINITIVE DESIGN: YES__NO.. _ (B) WHERE DESIGN WAS MOST RECENTLY USED: (3) TOTAL COST (C) - (A) + (B) OR (D) + ( E

  15. Base Realignment and Closure (BRAC) Cleanup Plan for Fort Devens, Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-08-01

    Fort Devens . The table will be updated as additional remedial actions are completed . Following Table D-1 are the executive summaries of...provides for the identification of appropriate, cost effective and integrated remedial actions , installation-wide. The BCT is working with the Fort Devens ...and 3-5, respectively. Three compliance-related activities at Fort Devens have been completed as early actions in order to reduce or eliminate

  16. Comprehensive Base Realignment/Closure and Fort Belvoir Development: Environmental Impact Statement

    DTIC Science & Technology

    1991-08-01

    nigromaculatus). Cameron Lake experiences no problems with exces- sive growth of submerged or emergent aquatic vegetation, because of the grazing by...Table 3-14 lists the invertebrates identified during the sampling period. Four species of submerged aquatic vegetation were found during the 1986...sites dated to the Paleo-Indian period. Most occupations can be assumed to have been in Coastal Plain areas that were later submerged by a rise in sea

  17. Military Base Realignments and Closures: DOD Has Improved Environmental Cleanup Reporting but Should Obtain and Share More Information

    DTIC Science & Technology

    2017-01-01

    the property, put final cleanup remedies in place before the property is transferred. However, under some circumstances the services may conduct an...early transfer before cleanup has been completed. When remedies are in place for addressing the contamination of a former installation or the...cleanup at BRAC installations will significantly increase due to the high cost of remediating emerging contaminants, primarily perfluorooctane

  18. The Air Force Handbook 2007

    DTIC Science & Technology

    2007-01-01

    sPEcIfIcATIOns Weight 51,000 lb. (22,950 kg ) Range 800 miles (695 nautical miles) Armament One 30 mm GAU-8/A seven-barrel Gatling gun with over 1,150...battlefield air and space profession- als who bring unequaled accuracy, responsiveness, flexibility, and persistence to the Joint warfight. LOSS Of...approximately $12.4 billion. This loss of buying power reduced Air Force Program content by an additional $10 billion per year. Base Realignment

  19. Lead-based paint awareness, work practices, and compliance during residential construction and renovation.

    PubMed

    Blando, James D; Antoine, Nickita; Lefkowitz, Daniel

    2013-05-01

    The U.S. Environmental Protection Agency recently implemented the Renovation, Repair and Painting (RRP) rule that applies to pre-1978 residences because of the potential presence of lead-based paint. Enforcement of this rule may be difficult and therefore it is crucial to understand the awareness and beliefs of contractors and the general public because these will likely be major determinants of exposures resulting from residential renovation work. The study described in this article utilized two mailed surveys: one directed to the general public and the other directed to contractors. The surveys were conducted in New Jersey and Virginia. Field observations were also recorded for work sites in New Jersey. Results indicated a high awareness among the general public about the hazards of lead, a low level of screening by children's doctors for lead exposure, frequent use of work practices that generate lots of dust, poor hygiene among contractors, and the potential for low compliance of contractors with the RRP rule. In particular, contractors who do not believe lead is a serious health hazard are expected to have the lowest compliance with the RRP rule. These findings serve as targets for effective public health interventions through education and outreach.

  20. Internal Versus External Fixation of Charcot Midfoot Deformity Realignment.

    PubMed

    Lee, Daniel J; Schaffer, Joseph; Chen, Tien; Oh, Irvin

    2016-07-01

    Internal and external fixation techniques have been described for realignment and arthrodesis of Charcot midfoot deformity. There currently is no consensus on the optimal method of surgical reconstruction. This systematic review compared the clinical results of surgical realignment with internal and external fixation, specifically in regard to return to functional ambulation, ulcer occurrence, nonunion, extremity amputation, unplanned further surgery, deep infection, wound healing problems, peri- or intraoperative fractures, and total cases with any complication. A search of multiple databases for all relevant articles published from January 1, 1990, to March 22, 2014, was performed. A logistic regression model evaluated each of the outcomes and its association with the type of fixation method. The odds of returning to functional ambulation were 25% higher for internal fixation (odds ratio [OR], 1.259). Internal fixation had a 42% reduced rate of ulcer occurrence (OR, 0.578). External fixation was 8 times more likely to develop radiographic nonunion than internal fixation (OR, 8.2). Internal fixation resulted in a 1.5-fold increase in extremity amputation (OR, 1.488), a 2-fold increase in deep infection (OR, 2.068), a 3.4-fold increase in wound healing complications (OR, 3.405), and a 1.5-fold increase in the total number of cases experiencing any complication (OR, 1.525). This was associated with a 20% increase in the need for unplanned further surgery with internal fixation (OR, 1.221). Although internal fixation may decrease the risk of nonunion and increase return to functional ambulation, it had a higher rate of overall complications than external fixation for realignment and arthrodesis of Charcot midfoot deformity. [Orthopedics. 2016; 39(4):e595-e601.]. Copyright 2016, SLACK Incorporated.

  1. [Endoscopic realignment with drainage via a peel-away sheath for the treatment of urethral rupture: A report of 21 cases].

    PubMed

    Han, Cong-Xiang; Xu, Wei-Jie; Li, Wei; Yu, Zhong-Ying; Li, Jin-Yu; Lin, Xia-Cong; Zhao, Li

    2016-07-01

    To study the clinical effect endoscopic realignment with drainage via a peel-away sheath in the treatment of urethral rupture. We treated 21 urethral rupture patients by endoscopic realignment with drainage via a peel-away sheath using normal saline for irrigation under the normal nephroscope or Li Xun nephroscope, followed by analysis of the clinical results. The operation was successfully accomplished in 20 cases but failed in 1 and none experienced urinary extravasation. In the 14 cases of bulbar urethral rupture, the mean operation time was (5.1±1.6) min and the mean Foley catheter indwelling time was (26.0±5.1) d. Urethral stricture developed in 57.1% (8/14) of the cases after catheter removal, of which 1 was cured by internal urethrotomy and the other 7 by urethral sound dilation, with an average maximum urinary flow rate of (18.8±1.8) ml/s at 12 months after operation. In the 6 cases of posterior urethral rupture, the mean operation time was (15.8±7.5) min and the mean Foley catheter indwelling time was 8 weeks. Urethral stricture developed in all the 6 cases after catheter removal, of which 3 cases were cured by urethral dilation, 1 by internal urethrotomy, and 2 by open urethroplasty. The average maxium urinary flow rate of the 4 cases exempt from open surgery was (17.9±1.9) ml/s at 12 months after operation. Endoscopic realignment with drainage via a peel-away sheath can keep the operative field clear, avoid intraoperative rinse extravasation, shorten the operation time, improve the operation success rate, and achieve satisfactory early clinical outcomes in the treatment of either bulbar or posterior urethral rupture.

  2. Early Realignment Versus Delayed Urethroplasty in Management of Pelvic Fracture Urethral Injury: A Meta-analysis.

    PubMed

    Firmanto, Rama; Irdam, Gampo A; Wahyudi, Irfan

    2016-04-01

    this meta-analysis study will evaluate the incidence of urethral stricture as a successfull parameter in the management of PFUI through early realignment, compared with delayed urethroplasty. Long-term complications such as erectile dysfunction and incontinence on both methods will also be evaluated. online literature was sourced from Pubmed, Embase, Cochrane, and Google Scholar. The incidence of stricture was evaluated from the entire study group of ER and DU. Stricture of the urethra is diagnosed by the symptoms such as the obstruction that felt by the patient, uroflowmetry examination, and urine residual post micturition that supported by urethrography examination at regular interval. In some cases the incidence of stricture also diagnosed by urethroscopy. The patient is assessed as not having stricture when it is no longer needed to do urethral dilatation or advanced urethrotomy. The rate of incontinence was assessed subjectively from the patient's complaints. The erectile function assessed subjectively; decreased of tumesen's degree, reduced the duration of erection, and penetration failure diagnosed as erection dysfunction. The data were processed as dichotomy data to calculate the risk ratio using Review Manager 5.1. five relevant literatures reviewed in this study. The incidence of urethral strictures are statistically significant lower in early realignment group (RR=0.70, 95% CI 0.50-0.99, P<0.05). There were no statistically significant differences between both treatment groups on the incidence of erectile dysfunction (RR=0.72, 95% CI 0.39-1.34) nor the incidence of incontinence (RR=0.74, 95% CI 0.36-1.51). early realignment decrease the occurrence of stricture on PFUI treatment compared to delayed urethroplasty method. Between the two methos, the complications such as erectile dysfunction and incontinence; however, there was no significant difference.

  3. [Early operative treatment of pelvic fractures associated with urethral disruption].

    PubMed

    Jia, Jian; Guo, Lu-Zeng; Wu, Chang-Lin; Chen, Jia-Geng; Zhang, Tie-Liang; Pei, Fu-Xing

    2007-02-15

    To evaluate the early operative treatment and clinical results of pelvic fractures associated with urethra disruption. From January 1995 to January 2005, 25 patients suffered from pelvic fractures combined urethra disruption treated by operation were retrospectively analyzed. According to Tile's classification, 1 case was stable pelvic fracture, 17 rotational unstable fractures, and 7 rotational combined vertical unstable fractures. The complete urethra rupture were in 23 cases and incomplete in 2 cases. The operative methods included: (1) emergency open reduction and internal fixation of the pelvis combined primary urethra suturing in 2 cases, partial suturing after realignment in 4 cases, realignment in 2 cases, and urethrovaginal penetrating wound repairing in 1 case; (2) primary urethra realignment only and delayed (range, 7 to 21 days) pelvic internal fixation in 10 cases; (3) early cystostomy and delayed (range, 3 to 21 days) urethra realignment and pelvic internal fixation in 6 cases. The mean follow-up time of all patients was 34 months (range from 6 to 120 months). According to Majeed's evaluation, 17 cases of pelvic injury showed excellent results, 5 good, and 3 fare. After urinary catheter removed, the mean maximal urine flow rate of 19 (76%) patients was 18.6 ml/s and the mean scar length between both disrupted ends on the film of excretion urethrography was 0.51 cm. Five (20%) cases suffered in dysuria needed urethral dilatation or further surgery. One (4%) female could not control urination who need a second-look operation. The primary suprapubic soft tissue avulsion wound infection secondary to retropubic abscess was found in 1 case, posterior urethra-stenosis in 5 cases, sexual impotence in 3 cases, and incontinence in 1 case. The satisfactory reduction and effective fixation of the pelvic fractures is an anatomical basis for receiving "tension-free urethral anastomosis".

  4. Navy Controls for Invoice, Receipt, Acceptance, and Property Transfer System Need Improvement

    DTIC Science & Technology

    2016-02-25

    iR APT as a web-based system to electronically invoice, receipt, and accept ser vices and product s from its contractors and vendors. The iR APT system...electronically shares document s bet ween DoD and it s contractors and vendors to eliminate redundant data entr y, increase data accuracy, and reduce...The iR APT system allows contractors to submit and track invoices and receipt and acceptance documents over the web and allows government personnel to

  5. Private Sector Adds to the Menu.

    ERIC Educational Resources Information Center

    Donovan, Sharon

    1997-01-01

    Two school districts, Kennewick School District WA and Salem-Keizer School District OR, are leveraging their food service contractor's resources to establish work-based courses stressing sophisticated management, culinary, and life skills. Under these instructional partnerships, the contractor, cooperating with school officials, develops the…

  6. 10 CFR 436.33 - Procedures and methods for contractor selection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... for contractor selection. (a) Competitive selection. Competitive selections based on solicitation of... synopsizes the proposed contract action. (2) Each competitive solicitation— (i) Shall request technical and... from those within the competitive range. (b) Unsolicited proposals. Federal agencies may— (1) Consider...

  7. Unions, Contractors and CTE

    ERIC Educational Resources Information Center

    Jarosz, Francesca

    2006-01-01

    Across Illinois, in places where unions thrive, construction industry professionals and career and technical education (CTE) teachers are working together in promoting work-based learning program to students. Likewise, the outreach program provides union-supported contractors with qualified candidates for future employment. Programs such as the…

  8. Report: EPA Lacks Processes to Validate Whether Contractors Receive Specialized Role-Based Training for Network and Data Protection

    EPA Pesticide Factsheets

    Report #17-P-0344, July 31, 2017. The EPA is unaware whether information security contractors possess the skills and training needed to protect the agency’s information, data and network from security breaches.

  9. 48 CFR 1552.216-77 - Award term incentive.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performance measures for the corresponding evaluation period; or (iii) The Government notifies the contractor....216-77 Section 1552.216-77 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY...) based on overall contractor performance as evaluated in accordance with the Clause entitled “Award Term...

  10. Cleanups In My Community (CIMC) - Base Realignment and Closure (BRAC) Superfund Sites, National Layer

    EPA Pesticide Factsheets

    This data layer provides access to Base Realignment and Closure (BRAC) Superfund Sites as part of the CIMC web service. EPA works with DoD to facilitate the reuse and redevelopment of BRAC federal properties. When the BRAC program began in the early 1990s, EPA worked with DoD and the states to identify uncontaminated areas and these parcels were immediately made available for reuse. Since then EPA has worked with DoD to clean up the contaminated portions of bases. These are usually parcels that were training ranges, landfills, maintenance facilities and other past waste-disposal areas. Superfund is a program administered by the EPA to locate, investigate, and clean up worst hazardous waste sites throughout the United States. EPA administers the Superfund program in cooperation with individual states and tribal governments. These sites include abandoned warehouses, manufacturing facilities, processing plants, and landfills - the key word here being abandoned.This data layer shows Superfund Sites that are located at BRAC Federal Facilities. Additional Superfund sites and other BRAC sites (those that are not Superfund sites) are included in other data layers as part of this web service.BRAC Superfund Sites shown in this web service are derived from the epa.gov website and include links to the relevant web pages within the attribute table. Data about BRAC Superfund Sites are located on their own EPA web pages, and CIMC links to those pages. The CIMC web service

  11. Functional Analysis and Preliminary Specifications for a Single Integrated Central Computer System for Secondary Schools and Junior Colleges. Interim Report.

    ERIC Educational Resources Information Center

    1968

    The present report proposes a central computing facility and presents the preliminary specifications for such a system. It is based, in part, on the results of earlier studies by two previous contractors on behalf of the U.S. Office of Education. The recommendations are based upon the present contractors considered evaluation of the earlier…

  12. Out of the Shadows: The Health and Well-Being of Private Contractors Working in Conflict Environments.

    PubMed

    Dunigan, Molly; Farmer, Carrie M; Burns, Rachel M; Hawks, Alison; Setodji, Claude Messan

    2014-01-01

    Over the past decade, private contractors have been deployed extensively around the globe. In addition to supporting U.S. and allied forces in Iraq and Afghanistan, contractors have assisted foreign governments, nongovernmental organizations, and private businesses by providing a wide range of services, including base support and maintenance, logistical support, transportation, intelligence, communications, construction, and security. At the height of the conflicts in Iraq and Afghanistan, contractors outnumbered U.S. troops deployed to both theaters. Although these contractors are not supposed to engage in offensive combat, they may nonetheless be exposed to many of the stressors that are known to have physical and mental health implications for military personnel. RAND conducted an online survey of a sample of contractors who had deployed on contract to a theater of conflict at least once between early 2011 and early 2013. The survey collected demographic and employment information, along with details about respondents' deployment experience (including level of preparation for deployment, combat exposure, and living conditions), mental health (including probable posttraumatic stress disorder, depression, and alcohol misuse), physical health, and access to and use of health care. The goal was to describe the contractors' health and well-being and to explore differences across the sample by such factors as country of citizenship, job specialty, and length and frequency of contract deployment. The findings provide a foundation for future studies of contractor populations and serve to inform policy decisions affecting contractors, including efforts to reduce barriers to mental health treatment for this population.

  13. Influence of Visual Prism Adaptation on Auditory Space Representation.

    PubMed

    Pochopien, Klaudia; Fahle, Manfred

    2017-01-01

    Prisms shifting the visual input sideways produce a mismatch between the visual versus felt position of one's hand. Prism adaptation eliminates this mismatch, realigning hand proprioception with visual input. Whether this realignment concerns exclusively the visuo-(hand)motor system or it generalizes to acoustic inputs is controversial. We here show that there is indeed a slight influence of visual adaptation on the perceived direction of acoustic sources. However, this shift in perceived auditory direction can be fully explained by a subconscious head rotation during prism exposure and by changes in arm proprioception. Hence, prism adaptation does only indirectly generalize to auditory space perception.

  14. Prism adaptation in alternately exposed hands.

    PubMed

    Redding, Gordon M; Wallace, Benjamin

    2013-08-01

    We assessed intermanual transfer of the proprioceptive realignment aftereffects of prism adaptation in right-handers by examining alternate target pointing with the two hands for 40 successive trials, 20 with each hand. Adaptation for the right hand was not different as a function of exposure sequence order or postexposure test order, in contrast with adaptation for the left hand. Adaptation was greater for the left hand when the right hand started the alternate pointing than when the sequence of target-pointing movements started with the left hand. Also, the largest left-hand adaptation appeared when that hand was tested first after exposure. Terminal error during exposure varied in cycles for the two hands, converging on zero when the right hand led, but no difference appeared between the two hands when the left hand led. These results suggest that transfer of proprioceptive realignment occurs from the right to the left hand during both exposure and postexposure testing. Such transfer reflects the process of maintaining spatial alignment between the two hands. Normally, the left hand appears to be calibrated with the right-hand spatial map, and when the two hands are misaligned, the left-hand spatial map is realigned with the right-hand spatial map.

  15. Study on advanced information processing system

    NASA Technical Reports Server (NTRS)

    Shin, Kang G.; Liu, Jyh-Charn

    1992-01-01

    Issues related to the reliability of a redundant system with large main memory are addressed. In particular, the Fault-Tolerant Processor (FTP) for Advanced Launch System (ALS) is used as a basis for our presentation. When the system is free of latent faults, the probability of system crash due to nearly-coincident channel faults is shown to be insignificant even when the outputs of computing channels are infrequently voted on. In particular, using channel error maskers (CEMs) is shown to improve reliability more effectively than increasing the number of channels for applications with long mission times. Even without using a voter, most memory errors can be immediately corrected by CEMs implemented with conventional coding techniques. In addition to their ability to enhance system reliability, CEMs--with a low hardware overhead--can be used to reduce not only the need of memory realignment, but also the time required to realign channel memories in case, albeit rare, such a need arises. Using CEMs, we have developed two schemes, called Scheme 1 and Scheme 2, to solve the memory realignment problem. In both schemes, most errors are corrected by CEMs, and the remaining errors are masked by a voter.

  16. Study on fault-tolerant processors for advanced launch system

    NASA Technical Reports Server (NTRS)

    Shin, Kang G.; Liu, Jyh-Charn

    1990-01-01

    Issues related to the reliability of a redundant system with large main memory are addressed. The Fault-Tolerant Processor (FTP) for the Advanced Launch System (ALS) is used as a basis for the presentation. When the system is free of latent faults, the probability of system crash due to multiple channel faults is shown to be insignificant even when voting on the outputs of computing channels is infrequent. Using channel error maskers (CEMs) is shown to improve reliability more effectively than increasing redundancy or the number of channels for applications with long mission times. Even without using a voter, most memory errors can be immediately corrected by those CEMs implemented with conventional coding techniques. In addition to their ability to enhance system reliability, CEMs (with a very low hardware overhead) can be used to dramatically reduce not only the need of memory realignment, but also the time required to realign channel memories in case, albeit rare, such a need arises. Using CEMs, two different schemes were developed to solve the memory realignment problem. In both schemes, most errors are corrected by CEMs, and the remaining errors are masked by a voter.

  17. Effects of surgical intervention on trochlear remodeling in pediatric patients with recurrent patella dislocation cases.

    PubMed

    Sugimoto, Dai; Christino, Melissa A; Micheli, Lyle J

    2016-07-01

    Patella instability is often encountered among physically active pediatric athletes, and surgical intervention is useful in cases with recurrent patella dislocations, chronic instability, and abnormal alignment. Several surgical procedures have been used for patella-realignment and stabilization, but the effects of surgical intervention on bony trochlear remodeling in skeletally immature patients have not been well studied. We thus present two cases of pediatric recurrent patella dislocations that showed trochlear remodeling following patella-realignment surgery. The first case describes an 11-year-old female treated with a Roux-Golthwait procedure and the second case highlights a 12-year-old male treated with lateral release and medial capsular reefing. The Merchant technique, a radiographic criterion that was designed to evaluate patella alignment in relation to the femoral trochlea groove, including sulcus and congruence angles was used to measure postoperative bony development. Both pediatric patients showed successful outcomes following surgical interventions for chronic patella instability. Using the Merchant technique, both patients showed improved congruence and sulcus angles postoperatively. Patella realignment in skeletally immature patients may be beneficial for promoting trochlear remodeling and deepening of the trochlear groove, which may help protect against future dislocation or subluxation events. Level IV, case report.

  18. Similarly Torn, Differentially Shorn? The Experience and Management of Conflict between Multiple Roles, Relationships, and Social Categories

    PubMed Central

    Jones, Janelle M.; Hynie, Michaela

    2017-01-01

    In three studies we examined the experience and management of conflict between different types of multiple identities. Participants described a conflict between pairs of role, relational, or social identities before rating the experience (i.e., magnitude, stress, and growth) and management of conflict on a newly developed scale assessing four strategies: reconciliation, where identities are integrated, realignment, where one identity is chosen over another, retreat, where both identities are avoided, and reflection, where fit (with others, situation) determines identity selection. In general, the types of identities mattered for conflict management but not its experience: Magnitude and growth did not differ, however, stress was greater for role identity conflicts (Study 3 only) and participants endorsed the use of more realignment for role conflicts (Study 2) and more retreat for relational conflicts (Study 3) relative to other types of identity conflicts. Furthermore, findings suggested that the perceived flexibility of identities, not their importance or valence, were associated with realignment and retreat for roles and with retreat for relationships. Experiencing conflicts between multiple identities leaves people similarly torn, but multiple roles and relationships may be differentially shorn to manage conflict. PMID:29051744

  19. Similarly Torn, Differentially Shorn? The Experience and Management of Conflict between Multiple Roles, Relationships, and Social Categories.

    PubMed

    Jones, Janelle M; Hynie, Michaela

    2017-01-01

    In three studies we examined the experience and management of conflict between different types of multiple identities. Participants described a conflict between pairs of role, relational, or social identities before rating the experience (i.e., magnitude, stress, and growth) and management of conflict on a newly developed scale assessing four strategies: reconciliation , where identities are integrated, realignment , where one identity is chosen over another, retreat , where both identities are avoided, and reflection , where fit (with others, situation) determines identity selection. In general, the types of identities mattered for conflict management but not its experience: Magnitude and growth did not differ, however, stress was greater for role identity conflicts ( Study 3 only ) and participants endorsed the use of more realignment for role conflicts ( Study 2 ) and more retreat for relational conflicts ( Study 3 ) relative to other types of identity conflicts. Furthermore, findings suggested that the perceived flexibility of identities, not their importance or valence, were associated with realignment and retreat for roles and with retreat for relationships. Experiencing conflicts between multiple identities leaves people similarly torn, but multiple roles and relationships may be differentially shorn to manage conflict.

  20. Pelvic fracture-associated urethral injuries in girls: experience with primary repair.

    PubMed

    Dorairajan, Lalgudi N; Gupta, Harendra; Kumar, Santosh

    2004-07-01

    To present our experience with four urethral injuries in females accompanying a pelvic fracture, managed with primary repair or realignment of the urethra. There were three teenage girls and one adult (22 years old). All the patients had complete urethral injuries associated with a pelvic fracture from accidents. They were managed by immediate suprapubic cystostomy followed by repair or realignment of the urethra over a catheter on the same day. The catheter was removed after 3 weeks and a voiding cysto-urethrogram taken. Thereafter they were followed with regular urethral calibration. All patients voided satisfactorily with a good stream; three were fully continent and the fourth had transient stress urinary incontinence. One patient needed dilatation at 2 months and another visual internal urethrotomy at 5 months. At a mean (range) follow-up of 33 (9-60) months all the patients had a normal voiding pattern and were continent; none developed vaginal stenosis. Primary repair of the urethra, and if that is impossible, simple urethral realignment over a catheter, is the procedure of choice for managing female urethral injury associated with a pelvic fracture. The procedure has the additional advantage of reducing the risk of vaginal stenosis.

  1. Prostatomembranous urethral disruptions: management by suprapubic cystostomy and delayed urethroplasty.

    PubMed

    Husmann, D A; Wilson, W T; Boone, T B; Allen, T D

    1990-07-01

    Management of prostatomembranous urethral disruptions associated with pelvic fractures remains a major controversy in urology. A group of 64 patients who suffered a prostatomembranous urethral disruption in association with a pelvic fracture and who were managed initially by suprapubic cystostomy with delayed urethroplasty was compared to 17 patients managed initially by primary realignment. No statistically significant difference in the incidence of impotence or urinary incontinence was found between the 2 groups (p greater than 0.5) Secondary reconstructions for impassable strictures developed in 95% of the patients treated by a suprapubic tube alone compared to 53% of those treated by primary realignment. Indeed, only 1 patient in the latter group achieved urethral continuity that did not require further intervention. We conclude that while primary realignment is associated with no increase in the instance of impotence and urinary incontinence, it subjects the patient to a major operation at a critical time and provides little in the way of long-term positive gains for the effort expended. In the final analysis the outcome is more dependent upon the nature of the injury and the quality of the repair than upon the order in which the repair is effected.

  2. 48 CFR 9904.401-60 - Illustrations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... manufacturing overhead to be applied to an estimated direct labor base. He identifies the items included in his... performance 4. Contractor estimates a total dollar amount for engineering labor which includes disparate and significant elements or functions of engineering labor. Contractor does not provide supporting data...

  3. 48 CFR 9904.401-60 - Illustrations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... manufacturing overhead to be applied to an estimated direct labor base. He identifies the items included in his... performance 4. Contractor estimates a total dollar amount for engineering labor which includes disparate and significant elements or functions of engineering labor. Contractor does not provide supporting data...

  4. 48 CFR 9904.401-60 - Illustrations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... manufacturing overhead to be applied to an estimated direct labor base. He identifies the items included in his... performance 4. Contractor estimates a total dollar amount for engineering labor which includes disparate and significant elements or functions of engineering labor. Contractor does not provide supporting data...

  5. 48 CFR 1509.406-3 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension and Ineligibility 1509.406-3 Procedures. (a... who do not appear on the GSA Consolidated List; e.g., those who are ineligible based on a settlement...) Obtain the HCA's recommendation prior to reaching a voluntary exclusion settlement with a Contractor in...

  6. 32 CFR 806b.36 - Disposing of records.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Defense Reutilization and Marketing Office or through activities that manage a base-wide recycling program. The recycling sales contract must contain a clause requiring the contractor to safeguard privacy.... Originators must safeguard Privacy Act material until it is transferred to the recycling contractor. A Federal...

  7. 32 CFR 806b.36 - Disposing of records.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Defense Reutilization and Marketing Office or through activities that manage a base-wide recycling program. The recycling sales contract must contain a clause requiring the contractor to safeguard privacy.... Originators must safeguard Privacy Act material until it is transferred to the recycling contractor. A Federal...

  8. 32 CFR 806b.36 - Disposing of records.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Defense Reutilization and Marketing Office or through activities that manage a base-wide recycling program. The recycling sales contract must contain a clause requiring the contractor to safeguard privacy.... Originators must safeguard Privacy Act material until it is transferred to the recycling contractor. A Federal...

  9. 32 CFR 806b.36 - Disposing of records.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Defense Reutilization and Marketing Office or through activities that manage a base-wide recycling program. The recycling sales contract must contain a clause requiring the contractor to safeguard privacy.... Originators must safeguard Privacy Act material until it is transferred to the recycling contractor. A Federal...

  10. 32 CFR 806b.36 - Disposing of records.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Defense Reutilization and Marketing Office or through activities that manage a base-wide recycling program. The recycling sales contract must contain a clause requiring the contractor to safeguard privacy.... Originators must safeguard Privacy Act material until it is transferred to the recycling contractor. A Federal...

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sattarivand, Mike; Summers, Clare; Robar, James

    Purpose: To evaluate the validity of using spine as a surrogate for tumor positioning with ExacTrac stereoscopic imaging in lung stereotactic body radiation therapy (SBRT). Methods: Using the Novalis ExacTrac x-ray system, 39 lung SBRT patients (182 treatments) were aligned before treatment with 6 degrees (6D) of freedom couch (3 translations, 3 rotations) based on spine matching on stereoscopic images. The couch was shifted to treatment isocenter and pre-treatment CBCT was performed based on a soft tissue match around tumor volume. The CBCT data were used to measure residual errors following ExacTrac alignment. The thresholds for re-aligning the patients basedmore » on CBCT were 3mm shift or 3° rotation (in any 6D). In order to evaluate the effect of tumor location on residual errors, correlations between tumor distance from spine and individual residual errors were calculated. Results: Residual errors were up to 0.5±2.4mm. Using 3mm/3° thresholds, 80/182 (44%) of the treatments required re-alignment based on CBCT soft tissue matching following ExacTrac spine alignment. Most mismatches were in sup-inf, ant-post, and roll directions which had larger standard deviations. No correlation was found between tumor distance from spine and individual residual errors. Conclusion: ExacTrac stereoscopic imaging offers a quick pre-treatment patient alignment. However, bone matching based on spine is not reliable for aligning lung SBRT patients who require soft tissue image registration from CBCT. Spine can be a poor surrogate for lung SBRT patient alignment even for proximal tumor volumes.« less

  12. Hypermutation signature reveals a slippage and realignment model of translesion synthesis by Rev3 polymerase in cisplatin-treated yeast.

    PubMed

    Segovia, Romulo; Shen, Yaoqing; Lujan, Scott A; Jones, Steven J M; Stirling, Peter C

    2017-03-07

    Gene-gene or gene-drug interactions are typically quantified using fitness as a readout because the data are continuous and easily measured in high throughput. However, to what extent fitness captures the range of other phenotypes that show synergistic effects is usually unknown. Using Saccharomyces cerevisiae and focusing on a matrix of DNA repair mutants and genotoxic drugs, we quantify 76 gene-drug interactions based on both mutation rate and fitness and find that these parameters are not connected. Independent of fitness defects, we identified six cases of synthetic hypermutation, where the combined effect of the drug and mutant on mutation rate was greater than predicted. One example occurred when yeast lacking RA D1 were exposed to cisplatin, and we characterized this interaction using whole-genome sequencing. Our sequencing results indicate mutagenesis by cisplatin in rad1 Δ cells appeared to depend almost entirely on interstrand cross-links at GpCpN motifs. Interestingly, our data suggest that the following base on the template strand dictates the addition of the mutated base. This result differs from cisplatin mutation signatures in XPF-deficient Caenorhabditis elegans and supports a model in which translesion synthesis polymerases perform a slippage and realignment extension across from the damaged base. Accordingly, DNA polymerase ζ activity was essential for mutagenesis in cisplatin-treated rad1 Δ cells. Together these data reveal the potential to gain new mechanistic insights from nonfitness measures of gene-drug interactions and extend the use of mutation accumulation and whole-genome sequencing analysis to define DNA repair mechanisms.

  13. Base Realignments and Closures: Report of the Defense Secretary’s Commission

    DTIC Science & Technology

    1988-12-29

    recommended to the Secretary of Defense several actions that should be taken to aid When it was determined that an local communities in their redevelopment...approved plans. Unlike some previous In many cases, they brought to the task a reviews, the Commission’s approach , first-hand knowledge of military...the by a professional staff (see Appendix D). individual Services. For example, the Air Force, driven by severe current and In organizing to accomplish

  14. Final Asbestos Report (AREE 65) Base Realignment and Closure Environmental Evaluation (BRAC EE), Part 2, Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-05-01

    Submitted to U.S. Army Environmental Center (USAEC) Aberden Proving Ground , Maryland Revision 1 May 1995 Arthur D. Littl., Inc. Acorn Park Camnbridge...ADORESS(ES) 10. SPONSORINGIMONITORING" ~AGENCY REPORT NUMBER U.S. Army Environmental Center Aberdeen Proving Ground , Maryland 11. SUPPLEMENTARY NOTES...May 1995 proves the material to be non-ACM. OSHA has classified these materials as "Presumed Asbestos-Containing Materials (PACM)." Therefore, SACBM

  15. Environmental Assessment Realignment of the Air Force Reserve 940th Air Refueling Group to McClellan Air Force Base, California

    DTIC Science & Technology

    1993-03-01

    Construction activities for the Proposed Action and alternatives would take place on a concrete aircraft parking apron, or on areas previously disturbed by...activities for the Proposed Action would take place on a concrete aircraft parking apron, or areas previously disturbed by past grading activities, except...therefore, no significant impacts would occur. Biological Resources. No threatened or endangered species or sensitive habitats exist within the project areas

  16. Military Construction: Analysis of the FY2012 Appropriation and Authorization

    DTIC Science & Technology

    2011-07-13

    Integrated Global Presence and Basing Strategy (IGPBS), later renamed the Global Defense Posture Realignment ( GDPR ). Separate from the 2005 BRAC...located in Germany, 9,600 in Italy, and 9,200 in the United Kingdom.26 As part of the GDPR mentioned earlier, Army and Air Force personnel in the...of EUCOM was scheduled to redeploy to new posts in the southwestern United States as part of the GDPR , but the Secretary of Defense agreed to

  17. Base Closure and Realignment Act (BRAC) Cleanup Plan, Sacramento Army Depot, Sacramento, California

    DTIC Science & Technology

    1995-10-01

    and remedial actions ( RAs ) presented in this document are believed to be accurate and have been reviewed by the regulatory agencies. However, this...of items to be competed, a time-phased schedule, and source selection criteria. The competition will begin as soon as possible. The Communications...allowed to be emitted into the region’s air from all permitted sources . If new sources are sited within these non-attainment areas, they cannot emit more

  18. Base Realignment and Closure (BRAC) Cleanup Plan, Ford Ord, Monterey, California

    DTIC Science & Technology

    1994-03-25

    2,036.39 1 10 Maria Antonia Field 563.19 1 11 Stephen Joseph Field 1,018.02 1 April 1944 Key: I = Undocumented o45.sj Fort Ord, California - 25 March 1994...geophysical anomalies Further investigation of canal containoc .etroleum hydrocarbons discharge area which depending on and vanous organic compounds...detected at various areas. Concentration below TPH cleanup standard. Canal discharge area soil contained Pb, Sb, and Cr at concentration of concern. For

  19. Implementing Base Realignment and Closure Decisions in Compliance with the National Environmental Policy Act

    DTIC Science & Technology

    1991-05-01

    February, 1991) Environmental Impact Statement Completion Date Fort Dix Jul 90 (A) Fort Devens - Fort Huachuca On Hold *Presidio of San Francisco May...the signing of the ROD in the NEPA process, documents must be revised, extending the environmental analysis process. As noted in the Fort Belvoir...91 Fort Sheridan Feb 91 (A) Fort Douglas Mar 91 Fort Meade Jul 91 Army Material Technology Laboratory Sep 91 Jefferson Proving Ground Sep 91 Cameron

  20. Summary and evaluation of the parametric study of potential early commercial MHD power plants (PSPEC)

    NASA Technical Reports Server (NTRS)

    Staigner, P. J.; Abbott, J. M.

    1980-01-01

    Two parallel contracted studies were conducted. Each contractor investigated three base cases and parametric variations about these base cases. Each contractor concluded that two of the base cases (a plant using separate firing of an advanced high temperature regenerative air heater with fuel from an advanced coal gasifier and a plant using an intermediate temperature metallic recuperative heat exchanger to heat oxygen enriched combustion air) were comparable in both performance and cost of electricity. The contractors differed in the level of their cost estimates with the capital cost estimates for the MHD topping cycle and the magnet subsystem in particular accounting for a significant part of the difference. The impact of the study on the decision to pursue a course which leads to an oxygen enriched plant as the first commercial MHD plant is described.

  1. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  2. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  3. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  4. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  5. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  6. 28 CFR 115.332 - Volunteer and contractor training.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... contact with residents have been trained on their responsibilities under the agency's sexual abuse and sexual harassment prevention, detection, and response policies and procedures. (b) The level and type of training provided to volunteers and contractors shall be based on the services they provide and level of...

  7. 28 CFR 115.332 - Volunteer and contractor training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... contact with residents have been trained on their responsibilities under the agency's sexual abuse and sexual harassment prevention, detection, and response policies and procedures. (b) The level and type of training provided to volunteers and contractors shall be based on the services they provide and level of...

  8. 28 CFR 115.232 - Volunteer and contractor training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... contact with residents have been trained on their responsibilities under the agency's sexual abuse and sexual harassment prevention, detection, and response policies and procedures. (b) The level and type of training provided to volunteers and contractors shall be based on the services they provide and level of...

  9. 28 CFR 115.232 - Volunteer and contractor training.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... contact with residents have been trained on their responsibilities under the agency's sexual abuse and sexual harassment prevention, detection, and response policies and procedures. (b) The level and type of training provided to volunteers and contractors shall be based on the services they provide and level of...

  10. 28 CFR 115.332 - Volunteer and contractor training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... contact with residents have been trained on their responsibilities under the agency's sexual abuse and sexual harassment prevention, detection, and response policies and procedures. (b) The level and type of training provided to volunteers and contractors shall be based on the services they provide and level of...

  11. 28 CFR 115.232 - Volunteer and contractor training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... contact with residents have been trained on their responsibilities under the agency's sexual abuse and sexual harassment prevention, detection, and response policies and procedures. (b) The level and type of training provided to volunteers and contractors shall be based on the services they provide and level of...

  12. Civilian Contractors under Military Law

    DTIC Science & Technology

    2007-01-01

    MEJAhave Autumn 2007 87 dogged the USA Patriot Act, as well; there has only been one successful prose- cution of an Afghanistan- or Iraq-based...Baghdad Central Confinement Facility in Abu Ghraib. See “Abu Ghraib Contractor Sen- tenced for Child Porn ,” Associated Press, 25 May 2007, http

  13. 48 CFR 44.302 - Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... shall determine the need for a CPSR based on, but not limited to, the past performance of the contractor, and the volume, complexity and dollar value of subcontracts. If a contractor's sales to the Government... adjustment contracts and sales of commercial items pursuant to Part 12) are expected to exceed $25 million...

  14. 48 CFR 44.302 - Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... shall determine the need for a CPSR based on, but not limited to, the past performance of the contractor, and the volume, complexity and dollar value of subcontracts. If a contractor's sales to the Government... adjustment contracts and sales of commercial items pursuant to Part 12) are expected to exceed $25 million...

  15. 28 CFR 115.32 - Volunteer and contractor training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... inmates have been trained on their responsibilities under the agency's sexual abuse and sexual harassment... volunteers and contractors shall be based on the services they provide and level of contact they have with...'s zero-tolerance policy regarding sexual abuse and sexual harassment and informed how to report such...

  16. 28 CFR 115.32 - Volunteer and contractor training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... inmates have been trained on their responsibilities under the agency's sexual abuse and sexual harassment... volunteers and contractors shall be based on the services they provide and level of contact they have with...'s zero-tolerance policy regarding sexual abuse and sexual harassment and informed how to report such...

  17. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  18. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  19. 48 CFR 642.1503-70 - Contractor Performance System (CPS).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Performance System (CPS) maintained by the National Institutes of Health. CPS is an Internet-based tool... with access to the Internet shall use CPS to evaluate contractor's past performance for all contracts... the CPS; or (2) At overseas locations where access to the Internet is not practicable. (d) Heads of...

  20. Contractor Incentives for Success in Implementing Performance-Based Logistics: A Progress Report

    DTIC Science & Technology

    2010-04-30

    amount of risk; this, however, gives the contractor more latitude in determining and applying its methods ( KMC /OPI, 2010). The general consensus...Klevan, P. (2008, October 27). Navy success with PBL. Presentation at the DoD Maintenance Symposium. KMC /OPI. (2010, January 19). Acquisition

  1. 41 CFR 60-250.44 - Required contents of affirmative action programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... veterans. (8) The contractor, in making hiring decisions, should consider applicants who are known special... decisions are based only on valid job requirements. The policy shall state that employees and applicants... career days, youth motivation programs, and related activities in their communities. (6) The contractor...

  2. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false General. 915.404-4-71-1 Section 915.404-4-71-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND...) Reward contractors based on the complexity of work; (2) Reward contractors who demonstrate and establish...

  3. Assessing the sustainable construction of large construction companies in Malaysia

    NASA Astrophysics Data System (ADS)

    Adewale, Bamgbade Jibril; Mohammed, Kamaruddeen Ahmed; Nasrun, Mohd Nawi Mohd

    2016-08-01

    Considering the increasing concerns for the consideration of sustainability issues in construction project delivery within the construction industry, this paper assesses the extent of sustainable construction among Malaysian large contractors, in order to ascertain the level of the industry's impacts on both the environment and the society. Sustainable construction explains the construction industry's responsibility to efficiently utilise the finite resources while also reducing construction impacts on both humans and the environment throughout the phases of construction. This study used proportionate stratified random sampling to conduct a field study with a sample of 172 contractors out of the 708 administered questionnaires. Data were collected from large contractors in the eleven states of peninsular Malaysia. Using the five-level rating scale (which include: 1= Very Low; 2= Low; 3= Moderate; 4= High; 5= Very High) to describe the level of sustainable construction of Malaysian contractors based on previous studies, statistical analysis reveals that environmental, social and economic sustainability of Malaysian large contractors are high.

  4. The main factor affecting the competitiveness of Contractor Company

    NASA Astrophysics Data System (ADS)

    Nurisra; Malahayati, Nurul; Mahmuddin

    2018-05-01

    Contractor companies must have the competitive advantage to compete in maintaining the survival of the company. Problems arise because quite a lot of advantages can be used and these advantages must be used appropriately to produce competitiveness for the company to continue to compete and to win the competition. This study aims to determine the main factors affecting the competitiveness of medium-class contractors in Banda Aceh. Data collection was obtained through questionnaires distributed to 31 middle-class contractors in Banda Aceh. Data processing and analysis is done by using descriptive analysis. Based on the result of descriptive analysis, it can be concluded that the most important competitiveness factor with a mean score value 4.52 is the relationship, and the factor that has the highest mean score value is the relationship with the government of 4.97, while the result of the ranking analysis is obtained 25 factor that is critical to the competitiveness of medium-class contractors in Banda Aceh.

  5. The experiences of security industry contractors working in Iraq: an interpretative phenomenological analysis.

    PubMed

    Messenger, Katy; Farquharson, Lorna; Stallworthy, Pippa; Cawkill, Paul; Greenberg, Neil

    2012-07-01

    To explore the occupational experiences of private security contractors working in a war zone and how it impacts on their mental health. Semistructured interviews were conducted with seven contractors employed by a large UK-based private security company. Interpretative phenomenological analysis was used to analyze the interview transcripts. Participants also completed the 12-item General Health Questionnaire and the Posttraumatic Stress Disorder Checklist. Four overarching themes emerged: the appeal of the job; vulnerability; keep going; and seeking help for stress in the workplace. No clinically significant levels of distress were reported. Contractors are frequently exposed to stressors known to increase risk of psychiatric difficulty in military personnel. A number of potential protective factors were identified. Only a minority of participants were open to seeking help for mental health difficulties.

  6. An Analysis of the Defense Logistics Agency’s Forward Stocking Initiatives at Albany and Barstow Distribution Depots and the Impact on Logistics Response Time

    DTIC Science & Technology

    placement of 6,255 line items at these respective locations . Data was able available through DLAs Data Warehouse for both the wholesale and retail mission due...to the Base Realignment and Closure Act of 2005 that forced services with co- located DLA Distribution Centers to transfer the retail mission to DLA...Furthermore, an examination of processes at each of the two Marine Corps Logistics Base locations demonstrates areas where further research and possible benchmarking would be beneficial to the supply chain.

  7. A strategic management model for evaluation of health, safety and environmental performance.

    PubMed

    Abbaspour, Majid; Toutounchian, Solmaz; Roayaei, Emad; Nassiri, Parvin

    2012-05-01

    Strategic health, safety, and environmental management system (HSE-MS) involves systematic and cooperative planning in each phase of the lifecycle of a project to ensure that interaction among the industry group, client, contractor, stakeholder, and host community exists with the highest level of health, safety, and environmental standard performances. Therefore, it seems necessary to assess the HSE-MS performance of contractor(s) by a comparative strategic management model with the aim of continuous improvement. The present Strategic Management Model (SMM) has been illustrated by a case study and the results show that the model is a suitable management tool for decision making in a contract environment, especially in oil and gas fields and based on accepted international standards within the framework of management deming cycle. To develop this model, a data bank has been created, which includes the statistical data calculated by converting the HSE performance qualitative data into quantitative values. Based on this fact, the structure of the model has been formed by defining HSE performance indicators according to the HSE-MS model. Therefore, 178 indicators have been selected which have been grouped into four attributes. Model output provides quantitative measures of HSE-MS performance as a percentage of an ideal level with maximum possible score for each attribute. Defining the strengths and weaknesses of the contractor(s) is another capability of this model. On the other hand, this model provides a ranking that could be used as the basis for decision making at the contractors' pre-qualification phase or during the execution of the project.

  8. Environmental Assessment for Construction of an Armed Forces Reserve Center Complex and Implementation of BRAC 05 Realignment Actions in Niagara Falls, New York

    DTIC Science & Technology

    2007-07-01

    and moves mainly in secondary fractures . Minerals in solution are calcite, dolomite , gypsum, and halite, resulting in hard and salty groundwater. Much...Lowland physiographic province. The Niagarian Provincial series is "richly fossiliferous" with 400 feet of deposits, including dolomite , limestone...delivered into the on-base distribution system through 10- to 12-inch mains. The. average water pressure supplied to the Installation is approximately

  9. Military Base Realignments and Closures. DOD Needs to Update Savings Estimates and Continue to Address Challenges in Consolidating Supply-Related Functions at Depot Maintenance Locations

    DTIC Science & Technology

    2009-07-01

    Comments from the Department of Defense 33 Appendix IV GAO Contact and Staff Acknowledgments 36 Related GAO Products 37 Tables Table...work of the U.S. government and is not subject to copyright protection in the United States. The published product may be reproduced and distributed in...disrupting maintenance production schedules due to personnel transfers since the employees are already experienced in performing these jobs. DLA Has

  10. Installation Restoration Program. Phase I: Records Search Minot Air Force Base, North Dakota.

    DTIC Science & Technology

    1984-12-01

    MAFB and Grand Forks AFB. This move localized command along with •. •• insuring that assigned units would be capable of conducting aerial...were realigned !•;>•’ to become members of the 57th AD. Also on May 1, Grand Forks AFB was \\.•/ assigned to the 4th AD at F.E. Warren AFB, Wyoming...potential for vertical - - stratification of possible ground water contaminants. During drilling, Shelby tube samples should be taken to provide soils

  11. Knowledge Transfer Loss in a Base Realignment and Closure (BRAC) Environment: A Positive or Negative Acquisition Paradigm Shift

    DTIC Science & Technology

    2012-04-01

    between 1946-1964), Gen-Xrs (born between 1965-1980), Millennials (born between 1981- 1990), and iGenerationals (born between 1991 and today). Research...generations (03 Traditionalist, 71 Generation X, 04 Millennial, and 00 iGeneration ). And there were 34 (11 percent) survey official responses where the...interesting insight into unintended consequences of “mass purge/new blood” on absorbing a short-term 0 50 100 150 200 No Response Opt-outs iGeneration

  12. Environmental Impact Statement. Comprehensive Base Realignment/Closure And Fort Belvoir Development.

    DTIC Science & Technology

    1991-08-01

    structural and cosmetic repairs and upgrades. The process is scheduled in phases and should be completed in fiscal year 1997. Figures 2-39 through 2-48...County Heritage Resources. The Belvoir ruins have been stabilized to preserve them, this having been begun in the late 1960s, and some cosmetic ...Data Center. Washington National Airport, DC. Oxley, D.J., M.B. Fenton , and G.R. Carmody. 1974. The Effects of Roads on Populations of Small Mammals. J

  13. Realigning Shared Governance With Magnet® and the Organization's Operating System to Achieve Clinical Excellence.

    PubMed

    Moreno, Janette V; Girard, Anita S; Foad, Wendy

    2018-03-01

    In 2012, an academic medical center successfully overhauled a 15-year-old shared governance to align 6 house-wide and 30 unit-based councils with the new Magnet Recognition Program® and the organization's operating system, using the processes of LEAN methodology. The redesign improved cross-council communication structures, facilitated effective shared decision-making processes, increased staff engagement, and improved clinical outcomes. The innovative structural and process elements of the new model are replicable in other health institutions.

  14. Geographic Perspectives on the Relationship of Air Force Base Realignments to Rural Community Welfare in the United States.

    DTIC Science & Technology

    1982-11-15

    as a "boom and bust" economy tied to the destiny of Larson AFB. Two basic activities have served to underpin and sustai4n the local economy; these...may seem. The ombudsznanship role played by the then embryo Office of Economic Adjustment, several federal agencies and the Maine congressional...civilian aviation purposes proved to be of vital importance to successful operation of the embryo port district. A source of funds was desperately

  15. A study on the attitudes and behavioural influence of construction waste management in occupied Palestinian territory.

    PubMed

    Al-Sari, Majed I; Al-Khatib, Issam A; Avraamides, Marios; Fatta-Kassinos, Despo

    2012-02-01

    As a step towards comprehending what drives the management of construction waste in the occupied Palestinian territory, this paper quantifies construction waste generation and examines how the local contractors' waste management attitudes and behaviour are influenced. Collection of data was based on a survey, carried out in the southern part of the West Bank between April and May 2010. The survey targeted contractors who specialized in the construction of buildings. A logistic regression model was used to investigate the relationship between various attributes and the attitudes and behaviour that the local contractors demonstrate towards waste management. The results showed that during the construction of buildings, 17 to 81 kg of construction waste are generated per square metre of building floor. Although the area of a building is the key factor determining 74.8% of the variation of construction waste generation, the employment of labour-intensive techniques in the study area means that human factors such as the contractor's attitude and behaviour towards waste management, exert a key influence on waste generation. Attitudes towards the 3Rs of waste minimization and behaviour towards waste disposal are generally positive with smaller contractors exhibiting more positive attitudes and more satisfactory behaviour towards waste management. Overall, while contractors' behaviour towards waste sorting and disposal tends to be more satisfactory among contractors who are more conscious about the potential environmental impacts of construction waste, it was generally observed that in the absence of a regulatory framework, the voluntary attitudes and behaviour among the local contractors are mostly driven by direct economic considerations.

  16. Total Quality Leadership

    NASA Technical Reports Server (NTRS)

    1991-01-01

    More than 750 NASA, government, contractor, and academic representatives attended the Seventh Annual NASA/Contractors Conference on Quality and Productivity. The panel presentations and Keynote speeches revolving around the theme of total quality leadership provided a solid base of understanding of the importance, benefits, and principles of total quality management (TQM). The presentations from the conference are summarized.

  17. 48 CFR 9904.413-60 - Illustrations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Illustrations. 9904.413-60... assets of $10 million that Contractor B has on the valuation date of January 1, 2017, the contractor makes a contribution of $100,000 on July 1, 2017, to cover its prior year's pension cost. Based on the...

  18. 48 CFR 9904.413-60 - Illustrations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Illustrations. 9904.413-60... assets of $10 million that Contractor B has on the valuation date of January 1, 2017, the contractor makes a contribution of $100,000 on July 1, 2017, to cover its prior year's pension cost. Based on the...

  19. 48 CFR 9904.413-60 - Illustrations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Illustrations. 9904.413-60... assets of $10 million that Contractor B has on the valuation date of January 1, 2017, the contractor makes a contribution of $100,000 on July 1, 2017, to cover its prior year's pension cost. Based on the...

  20. 48 CFR 1852.245-73 - Financial reporting of NASA property in the custody of contractors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... due. However, contractors' procedures must document the process for developing these estimates based... shall have formal policies and procedures, which address the validation of NF 1018 data, including data... validation is to ensure that information reported is accurate and in compliance with the NASA FAR Supplement...

  1. 48 CFR 1852.245-73 - Financial reporting of NASA property in the custody of contractors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... due. However, contractors' procedures must document the process for developing these estimates based... shall have formal policies and procedures, which address the validation of NF 1018 data, including data... validation is to ensure that information reported is accurate and in compliance with the NASA FAR Supplement...

  2. Results of a community-based survey of construction safety climate for Hispanic workers.

    PubMed

    Marin, Luz S; Cifuentes, Manuel; Roelofs, Cora

    2015-01-01

    Hispanic construction workers experience high rates of occupational injury, likely influenced by individual, organizational, and social factors. To characterize the safety climate of Hispanic construction workers using worker, contractor, and supervisor perceptions of the workplace. We developed a 40-item interviewer-assisted survey with six safety climate dimensions and administered it in Spanish and English to construction workers, contractors, and supervisors. A safety climate model, comparing responses and assessing contributing factors was created based on survey responses. While contractors and construction supervisors' (n = 128) scores were higher, all respondents shared a negative perception of safety climate. Construction workers had statistically significantly lower safety climate scores compared to supervisors and contractors (30·6 vs 46·5%, P<0·05). Safety climate scores were not associated with English language ability or years lived in the United States. We found that Hispanic construction workers in this study experienced a poor safety climate. The Hispanic construction safety climate model we propose can serve as a framework to guide organizational safety interventions and evaluate safety climate improvements.

  3. Results of a community-based survey of construction safety climate for Hispanic workers

    PubMed Central

    Marin, Luz S; Cifuentes, Manuel; Roelofs, Cora

    2015-01-01

    Background: Hispanic construction workers experience high rates of occupational injury, likely influenced by individual, organizational, and social factors. Objectives: To characterize the safety climate of Hispanic construction workers using worker, contractor, and supervisor perceptions of the workplace. Methods: We developed a 40-item interviewer-assisted survey with six safety climate dimensions and administered it in Spanish and English to construction workers, contractors, and supervisors. A safety climate model, comparing responses and assessing contributing factors was created based on survey responses. Results: While contractors and construction supervisors’ (n = 128) scores were higher, all respondents shared a negative perception of safety climate. Construction workers had statistically significantly lower safety climate scores compared to supervisors and contractors (30.6 vs 46.5%, P<0.05). Safety climate scores were not associated with English language ability or years lived in the United States. Conclusions: We found that Hispanic construction workers in this study experienced a poor safety climate. The Hispanic construction safety climate model we propose can serve as a framework to guide organizational safety interventions and evaluate safety climate improvements. PMID:26145454

  4. Effect of fiber distribution and realignment on the nonlinear and inhomogeneous mechanical properties of human supraspinatus tendon under longitudinal tensile loading.

    PubMed

    Lake, Spencer P; Miller, Kristin S; Elliott, Dawn M; Soslowsky, Louis J

    2009-12-01

    Tendon exhibits nonlinear stress-strain behavior that may be partly due to movement of collagen fibers through the extracellular matrix. While a few techniques have been developed to evaluate the fiber architecture of other soft tissues, the organizational behavior of tendon under load has not been determined. The supraspinatus tendon (SST) of the rotator cuff is of particular interest for investigation due to its complex mechanical environment and corresponding inhomogeneity. In addition, SST injury occurs frequently with limited success in treatment strategies, illustrating the need for a better understanding of SST properties. Therefore, the objective of this study was to quantitatively evaluate the inhomogeneous tensile mechanical properties, fiber organization, and fiber realignment under load of human SST utilizing a novel polarized light technique. Fiber distributions were found to become more aligned under load, particularly during the low stiffness toe-region, suggesting that fiber realignment may be partly responsible for observed nonlinear behavior. Fiber alignment was found to correlate significantly with mechanical parameters, providing evidence for strong structure-function relationships in tendon. Human SST exhibits complex, inhomogeneous mechanical properties and fiber distributions, perhaps due to its complex loading environment. Surprisingly, histological grade of degeneration did not correlate with mechanical properties.

  5. Pelvic fracture urethral injuries: the unresolved controversy.

    PubMed

    Koraitim, M M

    1999-05-01

    The unresolved controversies about pelvic fracture urethral injuries and whether any conclusions can be reached to develop a treatment plan for this lesion are determined. All data on pelvic fracture urethral injuries in the English literature for the last 50 years were critically analyzed. Studies were eligible only if data were complete and conclusive. The risk of urethral injury is influenced by the number of broken pubic rami as well as involvement of the sacroiliac joint. Depending on the magnitude of trauma, the membranous urethra is first stretched and then partially or completely ruptured at the bulbomembranous junction. Injuries to the prostatic urethra and bladder neck occur only in children. Injury to the female urethra usually is a partial tear of the anterior wall and rarely complete disruption of the proximal or distal urethra. Diagnosis depends on urethrography in men and on a high index of suspicion and urethroscopy in women. Of the 3 conventional treatment methods primary suturing of the disrupted urethral ends has the greatest complication rates of incontinence and impotence (21 and 56%, respectively). Primary realignment has double the incidence of impotence and half that of stricture compared to suprapubic cystostomy and delayed repair (36 versus 19 and 53 versus 97%, respectively, p <0.0001). In men surgical and endoscopic procedures do not compete but rather complement each other for treatment of different injuries under different circumstances, including indwelling catheter for urethral stretch injury, endoscopic stenting or suprapubic cystostomy for partial rupture, endoscopic realignment or suprapubic cystostomy for complete rupture with a minimal distraction defect and surgical realignment if the distraction defect is wide. Associated injury to the bladder, bladder neck or rectum dictates immediate exploration for repair but does not necessarily indicate exploration of the urethral injury site. In women treatment modalities are dictated by the level of urethral injury, including immediate retropubic realignment or suturing for proximal and transvaginal urethral advancement for distal injury.

  6. Defense Contracting: Key Data Not Routinely Used in Progress Payment Reviews

    DTIC Science & Technology

    1992-01-14

    the amount of pay- By .ments based on the fair value of undelivered work. Contractors may Distibtion ] submit requests for progress payments monthly and...exceed the Federal Acquisition Regulation limitations. These checks are based on contractor data and include the fair value and the loss ratio tests. The... fair value test is intended to ensure that progress payments for work in process do not exceed the value of that work. The loss ratio test is intended

  7. Ground-based plasma contractor characterization

    NASA Technical Reports Server (NTRS)

    Patterson, Michael J.; Aadland, Randall S.

    1987-01-01

    Presented are recent NASA Lewis Research Center (LeRC) plasma contractor experimental results, as well as a description of the plasma contractor test facility. The operation of a 24 cm diameter plasma source with hollow cathode was investigated in the lighted-mode regime of electron current collection from 0.1 to 7.0 A. These results are compared to those obtained with a 12 cm plasma source. Full two-dimensional plasma potential profiles were constructed from emissive probe traces of the contractor plume. The experimentally measured dimensions of the plume sheaths were then compared to those theoretically predicted using a model of a spherical double sheath. Results are consistent for currents up to approximately 1.0 A. For currents above 1.0 A, substantial deviations from theory occur. These deviations are due to sheath asphericity, and possibly volume ionization in the double-sheath region.

  8. The morphological development of newly inundated intertidal areas: the mechanisms driving the early evolution of an estuarine environment designed and constructed by humans

    NASA Astrophysics Data System (ADS)

    Dale, Jonathan; Burgess, Heidi; Cundy, Andrew

    2017-04-01

    Intertidal saltmarsh and mudflat habitats are of global importance due to the ecosystem, economic and cultural services they provide. These services include wildlife habitat provision and species diversity, immobilisation of pollutants and protection from coastal flooding. Saltmarsh and mudflat environments are, however, being lost and degraded due to erosion caused by rising sea levels and increased storminess. These losses are exacerbated by anthropogenic influences including land reclamation, increased coastal development and the construction of coastal flood defences which prevent the landwards migration of saltmarsh and mudflat environments, resulting in coastal squeeze. To compensate for saltmarsh and mudflat losses areas of the coastal hinterland are being inundated by breaching defences and constructing new defences inland, thus extending or constructing new estuarine environments; a processes known as de-embankment or managed realignment. Morphological engineering and landscaping within managed realignment sites prior to site inundation varies depending on the aims of the scheme. However, there is a shortage of data on the morphological evolution within these sites post site inundation impeding the ability of coastal engineers to effectively design and construct future sites. To date there has been a focus on the colonisation of marine macro fauna and flora within newly inundated managed realignment sites, which can be relatively rapid and easily quantified. Little is known of the morphological evolution in response to altered sedimentary processes, its driving mechanisms and therefore the success and ecological sustainability of these sites. This study evaluates the post-inundation morphological development of the largest open coast managed realignment site in Europe, at Medmerry on the south coast of the United Kingdom. Inundated in September 2013, the Medmerry Managed Realignment Site consists of a mosaic of former agricultural land and areas of lower elevation excavated during site construction, drained by a series of natural and engineered channels. Results indicate different rates and patterns of sedimentation and resulting morphology across the site. Near the breach continuous sedimentation of > 15cm over a 1 year period was measured, compared to rhythmic periods of accretion and erosion inland. These variations have been related to site design, former land-use and different sediment sources. The evolution of developing creek networks, formed by pluvial action and sediment "piping", are controlled by unconformities found in the sub-surface sediment related to Holocene site evolution. Analysis of the sedimentary processes and subsequent morphological development of these areas provides a new insight into coastal and estuarine evolution in an anthropogenically designed and constructed estuarine environment.

  9. Joint estimation of subject motion and tracer kinetic parameters of dynamic PET data in an EM framework

    NASA Astrophysics Data System (ADS)

    Jiao, Jieqing; Salinas, Cristian A.; Searle, Graham E.; Gunn, Roger N.; Schnabel, Julia A.

    2012-02-01

    Dynamic Positron Emission Tomography is a powerful tool for quantitative imaging of in vivo biological processes. The long scan durations necessitate motion correction, to maintain the validity of the dynamic measurements, which can be particularly challenging due to the low signal-to-noise ratio (SNR) and spatial resolution, as well as the complex tracer behaviour in the dynamic PET data. In this paper we develop a novel automated expectation-maximisation image registration framework that incorporates temporal tracer kinetic information to correct for inter-frame subject motion during dynamic PET scans. We employ the Zubal human brain phantom to simulate dynamic PET data using SORTEO (a Monte Carlo-based simulator), in order to validate the proposed method for its ability to recover imposed rigid motion. We have conducted a range of simulations using different noise levels, and corrupted the data with a range of rigid motion artefacts. The performance of our motion correction method is compared with pairwise registration using normalised mutual information as a voxel similarity measure (an approach conventionally used to correct for dynamic PET inter-frame motion based solely on intensity information). To quantify registration accuracy, we calculate the target registration error across the images. The results show that our new dynamic image registration method based on tracer kinetics yields better realignment of the simulated datasets, halving the target registration error when compared to the conventional method at small motion levels, as well as yielding smaller residuals in translation and rotation parameters. We also show that our new method is less affected by the low signal in the first few frames, which the conventional method based on normalised mutual information fails to realign.

  10. 48 CFR 245.7309-2 - Condition and location of property.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Quantity or Weight, and 245.7306-10, Risk of Loss, no request for adjustment in price or for rescission of... Contractor will load, then “where is” means f.o.b. conveyance at the point specified in the Invitation. (b) The description is based on the best available information. However, the Contractor makes no warranty...

  11. 48 CFR 215.404-71-3 - Contract type risk and working capital adjustment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Description. The contract type risk factor focuses on the degree of cost risk accepted by the contractor under... extract from the DD 1547 is annotated to explain the process. Item Contractor risk factors Assigned value Base (item 20) Profit objective 24. CONTRACT type risk (1) (2) (3) Cost financed Length factor Interest...

  12. Cleanups In My Community (CIMC) - RCRA and Base Realignment and Closure (BRAC) Federal Facilities, National Layer

    EPA Pesticide Factsheets

    This data layer provides access to Resource Conservation and Recovery Act (RCRA) Base Realignment and Closure (BRAC) sites as part of the CIMC web service. The Resource Conservation and Recovery Act, among other things, helps ensure that wastes are managed in an environmentally sound manner so as to protect human health and the environment from the potential hazards of waste disposal.In particular RCRA tightly regulates all hazardous waste from cradle to grave. In general, all generators, transporters, treaters, storers, and disposers of hazardous waste are required to provide information about their activities to state environmental agencies. These agencies, in turn pass on the information to regional and national EPA offices. Accidents or other activities at facilities that treat, store or dispose of hazardous wastes have sometimes led to the release of hazardous waste or hazardous constituents into soil, ground water, surface water, or air. When that happens, the RCRA Corrective Action program is one program that may be used to accomplish the necessary cleanup.This data layer shows those RCRA sites that are located at BRAC Federal Facilities. Additional RCRA sites and other BRAC sites (those that are not RCRA sites) are included in other data layers as part of this web service.Note: RCRA facilities which are not undergoing corrective action are not considered ??Cleanups?? in Cleanups in My Community. The complete set of RCRA facilities can be accessed via

  13. Comparative Evaluation of Phase 1 Results from the Energy Conversion Alternatives Study (ECAS). [coal utilization for electric power plants feasibility analysis

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Ten advanced energy conversion systems for central-station, based-load electric power generation using coal and coal-derived fuels which were studied by NASA are presented. Various contractors were selected by competitive bidding to study these systems. A comparative evaluation is provided of the contractor results on both a system-by-system and an overall basis. Ground rules specified by NASA, such as coal specifications, fuel costs, labor costs, method of cost comparison, escalation and interest during construction, fixed charges, emission standards, and environmental conditions, are presented. Each system discussion includes the potential advantages of the system, the scope of each contractor's analysis, typical schematics of systems, comparison of cost of electricity and efficiency for each contractor, identification and reconciliation of differences, identification of future improvements, and discussion of outside comments. Considerations common to all systems, such as materials and furnaces, are also discussed. Results of selected in-house analyses are presented, in addition to contractor data. The results for all systems are then compared.

  14. Development and validation of a strategic repositioning model for defense and aerospace contractors

    NASA Astrophysics Data System (ADS)

    Bers, John A.

    Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing, technology, or operations). (7) The absence of a difference in performance may be partly due to natural selection. Noncommercial markets tend to attract contractors with more deliberative, consultative, and process-oriented corporate cultures, while commercial markets tend to attract contractors with results-oriented, opportunistic cultures.

  15. 7 CFR 1210.501 - Realignment of districts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Florida counties of Alachua, Baker, Bay, Bradford, Calhoun, Clay, Columbia, Dixie, Duval, Escambia... California; San Bernardino, Riverside, San Diego, and Imperial. [71 FR 34234, June 14, 2006] ...

  16. 7 CFR 1210.501 - Realignment of districts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Florida counties of Alachua, Baker, Bay, Bradford, Calhoun, Clay, Columbia, Dixie, Duval, Escambia... California; San Bernardino, Riverside, San Diego, and Imperial. [71 FR 34234, June 14, 2006] ...

  17. Subaru FATS (fault tracking system)

    NASA Astrophysics Data System (ADS)

    Winegar, Tom W.; Noumaru, Junichi

    2000-07-01

    The Subaru Telescope requires a fault tracking system to record the problems and questions that staff experience during their work, and the solutions provided by technical experts to these problems and questions. The system records each fault and routes it to a pre-selected 'solution-provider' for each type of fault. The solution provider analyzes the fault and writes a solution that is routed back to the fault reporter and recorded in a 'knowledge-base' for future reference. The specifications of our fault tracking system were unique. (1) Dual language capacity -- Our staff speak both English and Japanese. Our contractors speak Japanese. (2) Heterogeneous computers -- Our computer workstations are a mixture of SPARCstations, Macintosh and Windows computers. (3) Integration with prime contractors -- Mitsubishi and Fujitsu are primary contractors in the construction of the telescope. In many cases, our 'experts' are our contractors. (4) Operator scheduling -- Our operators spend 50% of their work-month operating the telescope, the other 50% is spent working day shift at the base facility in Hilo, or day shift at the summit. We plan for 8 operators, with a frequent rotation. We need to keep all operators informed on the current status of all faults, no matter the operator's location.

  18. Integration of Occupational Safety to Contractors` or Subcontractors` Performance Evaluation in Construction Projects

    NASA Astrophysics Data System (ADS)

    Kozlovská, Mária; Struková, Zuzana

    2013-06-01

    Several factors should be considered by the owner and general contractor in the process of contractors` and subcontractors` selection and evaluation. The paper reviews the recent models addressed to guide general contractors in subcontractors' selection process and in evaluation of different contractors during the execution of the project. Moreover the paper suggests the impact of different contractors' performance to the overall level of occupational health and safety culture at the sites. It deals with the factors influencing the safety performance of contractors during construction and analyses the methods for assessing the safety performance of construction contractors. The results of contractors' safety performance evaluation could be a useful tool in motivating contractors to achieve better safety outcomes or could have effect on owners` or general contractors' decision making about contractors suitability for future contracting works.

  19. Realignment of Cannon Air Force Base Curry County, New Mexico

    DTIC Science & Technology

    1990-05-01

    Pattern for SAC-Type Aircraft (Not to Scale) ..... 3- 115 Figure 3.3.2-3. Typical Flight Pattern for Non-SAC-Type Aircraft (Not to Scale).. 3-116 Figure...local communities to implement a build-to-lease housing program under Section 801 of P.O. 98- 115 . The construction of 700 housing units under this program...hour 177 170 118 232 U Artesia Particulate 24-hour 90 121 102 169 SO2 24-hour 80 186 212 106 SO, 3-hour 424 * 928 451 £ NO, Annual * 115

  20. Corruption of pharmaceutical markets: addressing the misalignment of financial incentives and public health.

    PubMed

    Gagnon, Marc-André

    2013-01-01

    This paper explains how the current architecture of the pharmaceutical markets has created a misalignment of financial incentives and public health that is a central cause of harmful practices. It explores three possible solutions to address that misalignment: taxes, increased financial penalties, and drug pricing based on value. Each proposal could help to partly realign financial incentives and public health. However, because of the limits of each proposal, there is no easy solution to fixing the problem of financial incentives. © 2013 American Society of Law, Medicine & Ethics, Inc.

  1. Community-based partnerships for improving chronic disease management.

    PubMed

    Plumb, James; Weinstein, Lara Carson; Brawer, Rickie; Scott, Kevin

    2012-06-01

    With the growing burden of chronic disease, the medical and public health communities are re-examining their roles and opportunities for more effective prevention and clinical interventions. The potential to significantly improve chronic disease prevention and have an impact on morbidity and mortality from chronic conditions is enhanced by adopting strategies that incorporate a social ecology perspective, realigning the patient-physician relationship, integrating population health perspectives into the Chronic Care Model, and effectively engaging communities using established principles of community engagement. Copyright © 2012 Elsevier Inc. All rights reserved.

  2. Scoping Summary Report, Los Angeles AFB, California. Air Force Base Closure and Realignment Environmental Impact Analysis Process Support

    DTIC Science & Technology

    1990-07-01

    Mexico 87123 Dayton, Ohio 45402 * Richard A. Lampson Butch Maki Hydro Conduit Corp. Congressman Bill Richardson - 4801 Yucatan N.E. 548 Agua Fria...some chile con queso; however, that would be too much, and I think that might be considered a bribe. The Mayor asked me to convey his regrets. He’s tied...that God sends you here. Also, the small momento that Loretta is giving you, which is our state symbol, has a chile on it; and that’s to remind you

  3. Expanding Primary Care at William Beaumont Army Medical Center to Support an Increased Beneficiary Population Resulting from the 2005 Base Realignment and Closure Commission Report

    DTIC Science & Technology

    2006-07-01

    the Army Health Facility Planning Agency (HFPA). F HFPA Bl s B CCSIMakhldr PA& E ecision MECOM anpowe Support GPRMS SuthWest egion - IM CTRI WEIST (DcI 4...providers or resources. Finally, is there potential for consolidation of staff support areas such as lounges , locker rooms or conference areas (DoD Medical...Organization and Equipment for the ist AD (see appendix I). Utilizing this identified structure, the Army Force Management Support Agency web portal

  4. Department of the Navy FY 1994 Budget Estimates. DoD Base Realignment and Closure Program 2. (1991 Commission), Justification Data Submitted to Congress April 1991

    DTIC Science & Technology

    1993-04-01

    CA ........... ...................... ... 33 d. Naval Air Facility, Midway Island ..... ............. ... 35 e . Naval Air Station, Moffett Field...closed, removed, or monitored. e ’ In addition, the hazardous waste storage facility will be closed according to regulations. An asbestos inventory...1,939K and 326 enlisted at $11,543K. Other: None. S 7 0 0 0 S I. CO•PRm .• E N T C 2. DATE N ULDN FY 1994 MILITARY CONSTRUCTION PROJECT DATA 3

  5. Investigating the determinants of contractor's construction and demolition waste management behavior in Mainland China.

    PubMed

    Wu, Zezhou; Yu, Ann T W; Shen, Liyin

    2017-02-01

    The abundant generation of construction and demolition (C&D) waste presents a significant challenge to the sustainable development of the construction industry in Mainland China. As the implementer of construction activities, the contractor's C&D waste management performance plays an important role in C&D waste minimization. This paper aims to investigate the determinants of the contractor's C&D waste management behavior in Mainland China. The Theory of Planned Behavior (TPB) was selected as the basis of the theoretical model. In addition, three contextual constructs (i.e., economic viability, governmental supervision, and project constraints) were introduced, formulating the initial model. Based on the initial model, eight constructs were identified and seven hypotheses were proposed. A questionnaire survey was conducted to collect data and a Structural Equation Modeling (SEM) analysis was employed to test the proposed hypotheses. Results showed that the C&D waste management intention is not a significant determinant of contractor's C&D waste management behavior. The most important determinant is economic viability, followed by governmental supervision as the second most important determinant. Nevertheless, the construct of project constraints is an insignificant determinant for contractor's adoption of C&D waste management behavior. The research findings imply that, in Mainland China, the government, at this stage, plays an important role in guiding and promoting the contractor to exhibit better C&D waste management behavior. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. 75 FR 27981 - Southwest Montana Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ... and Grade Realignments, Yellow Star Thistle and Knapweed, Invasive Species Education and Awareness... Creek Weed Treatment, Maud-S Canyon Trail Reconstruction, Maverick Mountain Hazard Tree Removal, and...

  7. 7 CFR 1210.501 - Realignment of districts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., Gulf, Hamilton, Hernando, Holmes, Jackson, Jefferson, Lafayette, Leon, Levy, Liberty, Madison, Marion..., Virginia, Vermont, Wisconsin, West Virginia, and Washington, DC. (e) District 5—The State of California. (f...

  8. 7 CFR 1210.501 - Realignment of districts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., Gulf, Hamilton, Hernando, Holmes, Jackson, Jefferson, Lafayette, Leon, Levy, Liberty, Madison, Marion..., Virginia, Vermont, Wisconsin, West Virginia, and Washington, DC. (e) District 5—The State of California. (f...

  9. 7 CFR 1210.501 - Realignment of districts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., Gulf, Hamilton, Hernando, Holmes, Jackson, Jefferson, Lafayette, Leon, Levy, Liberty, Madison, Marion..., Virginia, Vermont, Wisconsin, West Virginia, and Washington, DC. (e) District 5—The State of California. (f...

  10. 48 CFR 1509.170-8 - Contractor Performance Report.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...

  11. Esthetic enhancement of a traumatized anterior tooth with a combination of forced eruption and tooth alignment: a case report

    PubMed Central

    Kang, So-Hee; Jin, Myoung-Uk; Kim, Sung-Kyo

    2016-01-01

    Exposing sound structure of a subgingivally fractured tooth using orthodontic extrusion is considered to be a conservative way to re-establish biologic width without sacrificing esthetics or jeopardizing periodontal support of neighboring teeth. When a misaligned tooth is traumatically involved, a more comprehensive approach combining tooth extrusion and re-alignment may be necessary for a successful restorative outcome. This case report describes a successful esthetic management of a patient with complicated crown-root fracture on the maxillary right central incisor and pre-existing malocclusion in the maxillary anterior region. Forced eruption along with re-alignment of teeth by orthodontic movement seems to allow re-positioning of the fracture line to a favorable position and correction of crowding, providing a better esthetic result. PMID:27508163

  12. Predicting translational deformity following opening-wedge osteotomy for lower limb realignment.

    PubMed

    Barksfield, Richard C; Monsell, Fergal P

    2015-11-01

    An opening-wedge osteotomy is well recognised for the management of limb deformity and requires an understanding of the principles of geometry. Translation at the osteotomy is needed when the osteotomy is performed away from the centre of rotation of angulation (CORA), but the amount of translation varies with the distance from the CORA. This translation enables proximal and distal axes on either side of the proposed osteotomy to realign. We have developed two experimental models to establish whether the amount of translation required (based on the translation deformity created) can be predicted based upon simple trigonometry. A predictive algorithm was derived where translational deformity was predicted as 2(tan α × d), where α represents 50 % of the desired angular correction, and d is the distance of the desired osteotomy site from the CORA. A simulated model was developed using TraumaCad online digital software suite (Brainlab AG, Germany). Osteotomies were simulated in the distal femur, proximal tibia and distal tibia for nine sets of lower limb scanograms at incremental distances from the CORA and the resulting translational deformity recorded. There was strong correlation between the distance of the osteotomy from the CORA and simulated translation deformity for distal femoral deformities (correlation coefficient 0.99, p < 0.0001), proximal tibial deformities (correlation coefficient 0.93-0.99, p < 0.0001) and distal tibial deformities (correlation coefficient 0.99, p < 0.0001). There was excellent agreement between the predictive algorithm and simulated translational deformity for all nine simulations (correlation coefficient 0.93-0.99, p < 0.0001). Translational deformity following corrective osteotomy for lower limb deformity can be anticipated and predicted based upon the angular correction and the distance between the planned osteotomy site and the CORA.

  13. Examining Adoption of e-Procurement in Public Sector Using the Perceived Characteristics of Innovating: Indonesian Perspective

    NASA Astrophysics Data System (ADS)

    Wahid, Fathul

    This study aims to examine factors affecting adoption of e-procurement in public sector with special reference to Indonesian context. The Perceived Characteristics of Innovating defined by Moore and Benbasat [1] used as the framework. Based on a survey to 87 contractors/suppliers in the city of Yogyakarta, the study finds that only trialability that affects use intention of e-procurement among the contractors/suppliers. The survey conducted in the early stage of e-procurement implementation is of the possible explanations. Government policy that forces the contractors/suppliers to use the e-procurement also partakes in this context. Practical implication of the findings are also discussed in the paper.

  14. Stirling convertor performance mapping test results

    NASA Astrophysics Data System (ADS)

    Qiu, Songgang; Peterson, Allen A.; White, Maurice A.; Faultersack, Franklyn; Redinger, Darin L.; Petersen, Stephen L.

    2002-01-01

    The Department of Energy (DOE) has selected Free-Piston Stirling Convertors as a technology for future advanced radioisotope space power systems. In August 2000, DOE awarded competitive Phase I, Stirling Radioisotope Generator (SRG) power system integration contracts to three major aerospace contractors, resulting in SRG conceptual designs in February 2001. All three contractors based their designs on the Technology Demonstration Convertor (TDC) developed by Stirling Technology Company (STC) for DOE. The contract award to a single system integration contractor for Phases II and III of the SRG program is anticipated in late 2001. The first potential SRG mission is targeted for a Mars rover. Recent TDC performance data are provided in this paper, together with predictions from Stirling simulation models. .

  15. 48 CFR 47.207-5 - Contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be... furnished by the contractor. Otherwise, state that the contractor shall furnish clean and sound closed-type...

  16. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Contractors' bonds. 1788.12 Section 1788.12... Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  17. 48 CFR 1845.502-70 - Contractor-acquired property.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor-acquired... Possession of Contractors 1845.502-70 Contractor-acquired property. All contractor-acquired property must be... contractor-acquired. (2) Submission of DD Form 1419, DOD Industrial Plant Requisition, or equivalent format...

  18. N-terminal domains of human DNA polymerase lambda promote primer realignment during translesion DNA synthesis

    PubMed Central

    Taggart, David J.; Dayeh, Daniel M.; Fredrickson, Saul W.; Suo, Zucai

    2014-01-01

    The X-family DNA polymerases λ (Polλ) and β (Polβ) possess similar 5′-2-deoxyribose-5-phosphatelyase (dRPase) and polymerase domains. Besides these domains, Polλ also possesses a BRCA1 C-terminal (BRCT) domain and a proline-rich domain at its N terminus. However, it is unclear how these non-enzymatic domains contribute to the unique biological functions of Polλ. Here, we used primer extension assays and a newly developed high-throughput short oligonucleotide sequencing assay (HT-SOSA) to compare the efficiency of lesion bypass and fidelity of human Polβ, Polλ and two N-terminal deletion constructs of Polλ during the bypass of either an abasic site or a 8-oxo-7,8-dihydro-2′-deoxyguanosine (8-oxodG) lesion. We demonstrate that the BRCT domain of Polλ enhances the efficiency of abasic site bypass by approximately 1.6-fold. In contrast, deletion of the N-terminal domains of Polλ did not affect the efficiency of 8-oxodG bypass relative to nucleotide incorporations opposite undamaged dG. HT-SOSA analysis demonstrated that Polλ and Polβ preferentially generated −1 or −2 frameshift mutations when bypassing an abasic site and the single or double base deletion frequency was highly sequence dependent. Interestingly, the BRCT and proline-rich domains of Polλ cooperatively promoted the generation of −2 frameshift mutations when the abasic site was situated within a sequence context that was susceptible to homology-driven primer realignment. Furthermore, both N-terminal domains of Polλ increased the generation of −1 frameshift mutations during 8-oxodG bypass and influenced the frequency of substitution mutations produced by Polλ opposite the 8-oxodG lesion. Overall, our data support a model wherein the BRCT and proline-rich domains of Polλ act cooperatively to promote primer/template realignment between DNA strands of limited sequence homology. This function of the N-terminal domains may facilitate the role of Polλ as a gap-filling polymerase within the non-homologous end joining pathway. PMID:25108835

  19. 48 CFR 18.102 - Central contractor registration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Central contractor... Central contractor registration. Contractors are not required to be registered in the Central Contractor.... (See 4.1102). However, contractors are required to register with CCR in order to gain access to the...

  20. Federal Agency Program Realignment and Closure Act

    THOMAS, 111th Congress

    Rep. Sullivan, John [R-OK-1

    2009-02-12

    House - 05/04/2009 Referred to the Subcommittee on Government Management, Organization, and Procurement. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  1. Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method

    NASA Astrophysics Data System (ADS)

    Alptekin, Orkun; Alptekin, Nesrin

    2017-10-01

    Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.

  2. 48 CFR 2427.305-2 - Follow-up by contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Follow-up by contractor....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to the... Contracting Officer shall send the form to those contractors whose contract work may have required the...

  3. 77 FR 69715 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-20

    ... Contractor Registration AGENCY: Department of Defense (DoD), General Services Administration (GSA), and... changes the clauses requiring contractor registration in the Central Contractor Registration (CCR... unique identifier for contractors. It is used (1) to uniquely identify a contractor entity, and (2) to...

  4. CoMFA analyses of C-2 position salvinorin A analogs at the kappa-opioid receptor provides insights into epimer selectivity.

    PubMed

    McGovern, Donna L; Mosier, Philip D; Roth, Bryan L; Westkaemper, Richard B

    2010-04-01

    The highly potent and kappa-opioid (KOP) receptor-selective hallucinogen Salvinorin A and selected analogs have been analyzed using the 3D quantitative structure-affinity relationship technique Comparative Molecular Field Analysis (CoMFA) in an effort to derive a statistically significant and predictive model of salvinorin affinity at the KOP receptor and to provide additional statistical support for the validity of previously proposed structure-based interaction models. Two CoMFA models of Salvinorin A analogs substituted at the C-2 position are presented. Separate models were developed based on the radioligand used in the kappa-opioid binding assay, [(3)H]diprenorphine or [(125)I]6 beta-iodo-3,14-dihydroxy-17-cyclopropylmethyl-4,5 alpha-epoxymorphinan ([(125)I]IOXY). For each dataset, three methods of alignment were employed: a receptor-docked alignment derived from the structure-based docking algorithm GOLD, another from the ligand-based alignment algorithm FlexS, and a rigid realignment of the poses from the receptor-docked alignment. The receptor-docked alignment produced statistically superior results compared to either the FlexS alignment or the realignment in both datasets. The [(125)I]IOXY set (Model 1) and [(3)H]diprenorphine set (Model 2) gave q(2) values of 0.592 and 0.620, respectively, using the receptor-docked alignment, and both models produced similar CoMFA contour maps that reflected the stereoelectronic features of the receptor model from which they were derived. Each model gave significantly predictive CoMFA statistics (Model 1 PSET r(2)=0.833; Model 2 PSET r(2)=0.813). Based on the CoMFA contour maps, a binding mode was proposed for amine-containing Salvinorin A analogs that provides a rationale for the observation that the beta-epimers (R-configuration) of protonated amines at the C-2 position have a higher affinity than the corresponding alpha-epimers (S-configuration). (c) 2010. Published by Elsevier Inc.

  5. New Systems of Food Service Management for the Air Force

    DTIC Science & Technology

    1979-09-01

    Without good management and successful innovations to meet customer needs, institutional food systems either survive precariously, or on a...unlimited access to all base facilities as well as the innovative , profit oriented management of the contractor. The results of this analysis and its...of innovative , profit-oriented management on the part of the contractor. The results of this analysis, along with its impact on the data presented in

  6. Baseline Water Demand at Forward Operating Bases

    DTIC Science & Technology

    2013-09-15

    population, often equaling or exceeding the military population: • Brigade: 6000 soldiers • Battalion: 1000 soldiers • Company : 150 soldiers. ERDC/CERL TR...requirements for a company outpost (COP) of 120 personnel (PAX) in the format that the computer tool generates. This tool generates a basic sus...facilities world-wide through several large contractors. One contractor, Kellogg , Brown, and Root (KBR), used a minimum planning factor of 18.4

  7. Performance-Based Logistics, Contractor Logistics Support, and Stryker

    DTIC Science & Technology

    2007-06-15

    automotive , armament, missile, communications, special devices, and ground equipment repair. The essential maintenance task for the FMC is to maintain...technologies and welding techniques into their production processes. Finally, GDLS’s use of progressive management techniques and supply chain information...C4ISR, MEP) per the NMC criteria in the -10 manual, the contractors system only focuses on the platform or automotive status. Thus a vehicle “up” for

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    ADAMS, WADE C

    The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys include gamma surface scans, gamma direct measurements, and soil sampling.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    ADAMS, WADE C

    The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys included gamma surface scans, gamma direct measurements, and soil sampling.

  10. Capital Investment Motivational Techniques Used by Prime Contractors on Subcontractors

    DTIC Science & Technology

    1984-12-01

    by block number) Productivity; Profit Policy; Subcontractors; Weighted Guidelines; Profitability; Profit 20. ABSTRACT (Continue on reverse aide If...probably productivity gains that could be made if defense contractors increased their investment [6:39]. A major deterrent to the Weighted Guideline...any profit gained would be offset to some degree by a profit loss from a reduction in profit based on costs . This result is a consequence of the cost

  11. 20 CFR 401.90 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Contractors. 401.90 Section 401.90 Employees... Privacy Act § 401.90 Contractors. (a) All contracts which require a contractor to maintain, or on behalf... requiring the contractor to comply with the Privacy Act and this part. (b) A contractor and any employee of...

  12. Pooling knowledge and improving safety for contracted works at a large industrial park.

    PubMed

    Agnello, Patrizia; Ansaldi, Silvia; Bragatto, Paolo

    2015-01-01

    At a large chemical park maintenance is contracted by the major companies operating the plants to many small firms. The cultural and psychological isolation of contractor workers was recognized a root cause of severe accidents in the recent years. That problem is common in chemical industry. The knowledge sharing has been assumed a good key to involve contractors and sub contractors in safety culture and contributing to injuries prevention. The selection of personal protective equipment PPE for the maintenance works has been taken as benchmark to demonstrate the adequateness of the proposed approach. To support plant operators, contractors and subcontractors in PPE discussion, a method has been developed. Its core is a knowledge-base, organized in an Ontology, as suitable for inferring decisions. By means of this tool all stakeholders have merged experience and information and find out the right PPE, to be provided, with adequate training and information package. PPE selection requires sound competencies about process and environmental hazards, including major accident, preventive and protective measures, maintenance activities. These pieces of knowledge previously fragmented among plant operators and contractors, have to be pooled, and used to find out the adequate PPE for a number of maintenance works. The PPE selection is per se important, but it is also a good chance to break the contractors' isolation and involve them in safety objectives. Thus by pooling experience and practical knowledge, the common understanding of safety issues has been strengthened.

  13. 78 FR 22215 - Airworthiness Directives; The Boeing Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-15

    ... necessary; a one-time eddy current inspection of certain fastener holes for cracking, and repair if... realignment if necessary; a one-time eddy current inspection of certain fastener holes for cracking, and...

  14. A planning and marketing prototype for changing health care organizations.

    PubMed

    Boshard, N

    1986-11-01

    The U.S. health care industry is undergoing a radical transformation. The consolidation of excess hospital capacity, fierce competition within a shrinking medical marketplace and a growing number of competitive health plans (PPOs and HMOs) are causing a major structural realignment within most health care organizations (HCOs). This realignment has resulted in a much greater reliance upon strategic planning and marketing by HCOs to cope with market-driven competitive challenges. Health care organizations must identify a new cadre of health professionals to support strategic planning, market promotion, market research, market sales and product line management. This new cadre must hold the value that customers (physicians, patients, and employers) are the most valuable asset of the health care organizations. The planning and marketing prototype depicted herein is designed to help HCOs find, differentiate and keep customers.

  15. A 3.9 ps Time-Interval RMS Precision Time-to-Digital Converter Using a Dual-Sampling Method in an UltraScale FPGA

    NASA Astrophysics Data System (ADS)

    Wang, Yonggang; Liu, Chong

    2016-10-01

    Field programmable gate arrays (FPGAs) manufactured with more advanced processing technology have faster carry chains and smaller delay elements, which are favorable for the design of tapped delay line (TDL)-style time-to-digital converters (TDCs) in FPGA. However, new challenges are posed in using them to implement TDCs with a high time precision. In this paper, we propose a bin realignment method and a dual-sampling method for TDC implementation in a Xilinx UltraScale FPGA. The former realigns the disordered time delay taps so that the TDC precision can approach the limit of its delay granularity, while the latter doubles the number of taps in the delay line so that the TDC precision beyond the cell delay limitation can be expected. Two TDC channels were implemented in a Kintex UltraScale FPGA, and the effectiveness of the new methods was evaluated. For fixed time intervals in the range from 0 to 440 ns, the average RMS precision measured by the two TDC channels reaches 5.8 ps using the bin realignment, and it further improves to 3.9 ps by using the dual-sampling method. The time precision has a 5.6% variation in the measured temperature range. Every part of the TDC, including dual-sampling, encoding, and on-line calibration, could run at a 500 MHz clock frequency. The system measurement dead time is only 4 ns.

  16. [Surgical selection and efficacy assessment for membranous urethral trauma caused by pelvic fracture].

    PubMed

    Zhu, Li-Zhen; Liu, Liang-Le; Cai, Chun-Yuan; Yang, Guo-Jing; Zhang, Li-Cheng; Zhu, Qi

    2012-08-01

    To explore selection and efficacy assessment for membranous urethral trauma caused by pelvic fracture. From June 2000 to August 2010, 72 patients with membranous urethral trauma caused by pelvic fracture were selected. There were 46 males and 26 females,ranging age from 26 to 62 years (averaged 35.2 years). The time from injury to hospitalization time was 1 to 3 hours. According to Tile pelvic fracture classification, there were 8 patients with type A, 45 patients with type B, 19 patients with type C. Thirty of the 35 patients with partial rupture of posterior urethral were treated by catheterization,5 patients treated by rupture anastomosis on the stage I combined with cystostomy; 25 of the 37 patients with complete rupture of posterior urethra were treated by early realignment, and 12 patients were treated by cystostomy. Urinary incontinence, impotence and urethrostenosis were evaluated. All patients were followed up for 5 to 10 years (mean 7.7 years). Incidence of urethrostenosis, impotence and urinary incontinence in patients treated by cystostomy were significantly higher than rupture anastomosis on the stage I and early realignment (P < 0.05); while incidence in patients treated by catheterization was significantly lower than other groups (P < 0.05). For patients with partial rupture of posterior urethral, catheterization and rupture anastomosis on the stage I are preferred methods; while patients with complete rupture of posterior urethra, early realignment is a preferred method with advantages of simple operation and less complications.

  17. The selection of construction sub-contractors using the fuzzy sets theory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krzemiński, Michał

    The paper presents the algorithm for the selection of sub-contractors. Main area of author’s interest is scheduling flow models. The ranking task aims at execution time as short as possible Brigades downtime should also be as small as possible. These targets are exposed to significant obsolescence. The criteria for selection of subcontractors will not be therefore time and cost, it is assumed that all those criteria be meet by sub-contractors. The decision should be made in regard to factors difficult to measure, to assess which is the perfect application of fuzzy sets theory. The paper will present a set ofmore » evaluation criteria, the part of the knowledge base and a description of the output variable.« less

  18. 48 CFR 1509.170-5 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-5 Policy. (a) Contracting officers are responsible for the timely completion of contractors' performance evaluations. The National Institutes of Health Contractor Performance System shall be used to record individual contractor performance histories...

  19. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  20. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  1. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  2. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  3. 48 CFR 1509.170-5 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-5 Policy. (a) Contracting officers are responsible for the timely completion of contractors' performance evaluations. The National Institutes of Health Contractor Performance System shall be used to record individual contractor performance histories...

  4. 76 FR 39015 - Contractor Performance Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ...] Contractor Performance Information AGENCY: Environmental Protection Agency (EPA), ACTION: Direct final rule... contractor performance information. EPA is issuing a final rule because the changes are procedural in nature... Institutes of Health's Contractor Performance System (CPS) to the Department of Defense's Contractor...

  5. 48 CFR 3009.171-8 - Ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Ineligible contractors..., HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 3009.171-8 Ineligible contractors. Any business concern determined to be ineligible...

  6. Evolved Expendable Launch Vehicle (EELV)

    DTIC Science & Technology

    2015-12-15

    FY13+ Phase I Buy Contractor: United Launch Services, LLC Contractor Location: 9501 East Panorama Circle Centennial , CO 80112 Contract Number...Contract Name: FY13+ Phase I Buy Contractor: United Launch Services, LLC Contractor Location: 9501 East Panorama Circle Centennial , CO 80112 Contract...FY12 EELV Launch Services (ELS5) Contractor: United Launch Services, LLC. Contractor Location: 9501 East Panorama Circle Centennial , CO 80112

  7. Current practices of construction waste reduction through 3R practice among contractors in malaysia: Case study in penang

    NASA Astrophysics Data System (ADS)

    Ng, L. S.; Tan, L. W.; Seow, T. W.

    2017-11-01

    The effectiveness of the implementation of construction waste reduction through 3R reflects the sustainability in construction waste management. Weak implementation of construction waste reduction through 3R among contractors will lead to unsustainable construction waste management. Increase in construction waste on landfills is critical especially on islands where land is very limited for solid waste disposal. This aim of this paper is to investigate current practice of construction waste reduction through 3R practice among contractors in Penang, Malaysia. The findings reported herein is based on feedbacks from 143 construction contractors of grade CIDB G7, G6 and G5 in Penang and experts from Penang Local Authority, CIDB in Penang and its Headquarters, National Solid Waste Management Department, and Headquarters of Solid Waste and Public Cleansing Management Corporation. Interviews and questionnaire surveys have been found that 3R practice is not mandatory in construction waste management in Penang. Only 39.8% construction contractors practiced 3R in managing their waste. Therefore, 3R practices should be emphasized in construction industry. Reducing wastes through 3R practices in construction industry is a way forward towards sustainable construction waste management especially in expanding the lifetime of landfill.

  8. Safety, reliability, maintainability and quality provisions for the Space Shuttle program

    NASA Technical Reports Server (NTRS)

    1990-01-01

    This publication establishes common safety, reliability, maintainability and quality provisions for the Space Shuttle Program. NASA Centers shall use this publication both as the basis for negotiating safety, reliability, maintainability and quality requirements with Shuttle Program contractors and as the guideline for conduct of program safety, reliability, maintainability and quality activities at the Centers. Centers shall assure that applicable provisions of the publication are imposed in lower tier contracts. Centers shall give due regard to other Space Shuttle Program planning in order to provide an integrated total Space Shuttle Program activity. In the implementation of safety, reliability, maintainability and quality activities, consideration shall be given to hardware complexity, supplier experience, state of hardware development, unit cost, and hardware use. The approach and methods for contractor implementation shall be described in the contractors safety, reliability, maintainability and quality plans. This publication incorporates provisions of NASA documents: NHB 1700.1 'NASA Safety Manual, Vol. 1'; NHB 5300.4(IA), 'Reliability Program Provisions for Aeronautical and Space System Contractors'; and NHB 5300.4(1B), 'Quality Program Provisions for Aeronautical and Space System Contractors'. It has been tailored from the above documents based on experience in other programs. It is intended that this publication be reviewed and revised, as appropriate, to reflect new experience and to assure continuing viability.

  9. Strategic Defense Initiative Demonstration/Validation Program Environmental Assessment. Space-Based Surveillance and Tracking System (SSTS),

    DTIC Science & Technology

    1987-08-01

    take place in both contractor and government facilities. The on-orbit evaluation could utilize modified launch facilities depending on the launch...technological issues : o Telescope Optics: Verify that the distortions associated vith large optical elements satisfy detection and tracking requirements; verify...Validation program vould be car- ried out at contractor facilities that 1’ave not been identified and at six government facilities (Arnold Engineering

  10. California’s Shrinking Defense Contractors: Effects on Small Suppliers,

    DTIC Science & Technology

    1996-01-01

    They did not physically segregate any parts of their operations or set up a separate data management system to do business with prime contractors...of them out of business . * Small defense aerospace suppliers are not making cutting-edge products for commercial customers. Small defense aerospace...are considered critical to their primes’ supplier base are concerned. Most Firms Are Still in Business When we checked with a random sample of small

  11. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  12. 48 CFR 9.602 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.602 General. (a) Contractor team arrangements may be..., cost, and delivery for the system or product being acquired. (b) Contractor team arrangements may be... acquisitions, including production. (c) The companies involved normally form a contractor team arrangement...

  13. 48 CFR 9.602 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.602 General. (a) Contractor team arrangements may be..., cost, and delivery for the system or product being acquired. (b) Contractor team arrangements may be... acquisitions, including production. (c) The companies involved normally form a contractor team arrangement...

  14. 48 CFR 9.602 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.602 General. (a) Contractor team arrangements may be..., cost, and delivery for the system or product being acquired. (b) Contractor team arrangements may be... acquisitions, including production. (c) The companies involved normally form a contractor team arrangement...

  15. 48 CFR 9.602 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.602 General. (a) Contractor team arrangements may be..., cost, and delivery for the system or product being acquired. (b) Contractor team arrangements may be... acquisitions, including production. (c) The companies involved normally form a contractor team arrangement...

  16. 48 CFR 9.602 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.602 General. (a) Contractor team arrangements may be..., cost, and delivery for the system or product being acquired. (b) Contractor team arrangements may be... acquisitions, including production. (c) The companies involved normally form a contractor team arrangement...

  17. 48 CFR 51.104 - Furnishing assistance to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractors. 51.104 Section 51.104 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 51.104 Furnishing assistance to contractors. After receiving an activity address code, the contracting...

  18. 48 CFR 752.7013 - Contractor-mission relationships.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor-mission....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas.... Contractor-Mission Relationships (OCT 1989) (a) The Contractor acknowledges that this contract is an...

  19. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is..., and furnishing such information to the Government as required. (b) The contractor may be required to...

  20. Potential Impacts Related to the Air Training Command Realignments. Institutional Characteristics, Transportation, Civilian Community Utilities, Land Use for Craig AFB, Alabama, Webb AFB, Texas, Columbus AFB, Mississippi, Laughlin AFB, Texas, Reese AFB, Texas, Vance AFB, Oklahoma

    DTIC Science & Technology

    1976-12-30

    response and 70.4 percent civilian response, extend to 100 percent population, 1975; Counity Census Data, General Social =0 Economic Characteristics. 25...transportation problems exist and the alternative action is not txpected to disturb the situation in the future. 86 On-Base (AFERN 4.4.1.3) No major problema of...values could increase in specific residential areas that are perceived as meeting certain economic and social needs where current 7acancies are minimal

  1. Military Base Realignments and Closures: Impact of Terminating, Relocating, or Outsourcing the Services of the Armed Forces Institute of Pathology

    DTIC Science & Technology

    2007-11-01

    sexes , all races/ethnicities, all ages, as well... Tenn . 2 Ala. 88 Fla. 820 Ga. 1,220 S.C. 291 N.C. 1,371 Va. 1,476 Ohio 467 N.H. 0 Mass. 6 R.I. 0Mich. 1 Calif. 1,974 Wash. 671 Wis. 13 N.Y. 1,614 Maine...809 Tenn . 205 Ala. 102 Fla. 1,109 Ga. 376 S.C. 396 N.C. 769 Va. 331 Ohio 731 N.H. 40 Mass. 97 R.I. 38Mich. 189 Calif. 801 Wash. 59 Wis. 68 N.Y.

  2. Valley Forge alternative transportation feasibility study

    DOT National Transportation Integrated Search

    2004-06-01

    NPS, as part of their General Management Plan (GMP) realignment, worked with Volpe to develop a series of alternative transportation methods in Valley Forge National Historical Park. Automobiles are the predominant means of transportation in the park...

  3. 48 CFR 945.610-4 - Contractor inventory in foreign countries.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor inventory in... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 945.610-4 Contractor inventory in foreign countries. Contractor inventory located in foreign countries...

  4. 48 CFR 852.237-70 - Contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor....237-70 Contractor responsibilities. As prescribed in 837.110, insert the following clause: Contractor Responsibilities (APR 1984) The contractor shall obtain all necessary licenses and/or permits required to perform...

  5. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ...-AL92 Federal Acquisition Regulation; Oversight of Contractor Ethics Programs AGENCY: Department of... that contractors have implemented the mandatory contractor business ethics program requirements. DATES... to Improve DoD's Oversight of Contractor Ethics Programs. The ethics program requirement flows from...

  6. 41 CFR 109-43.302-50 - Utilization by designated contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... designated contractors. 109-43.302-50 Section 109-43.302-50 Public Contracts and Property Management Federal... Utilization by designated contractors. Heads of field organizations may authorize designated contractors to... Federal agency, provided the designated contractors have written policies and procedures. ...

  7. 30 CFR 45.4 - Independent contractor register.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Independent contractor register. 45.4 Section... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.4 Independent contractor register. (a) Each independent contractor shall provide the production-operator in writing the following information: (1) The independent...

  8. 41 CFR 60-741.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-741.68 Section 60-741.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... Reinstatement of ineligible contractors. (a) Application for reinstatement. A contractor debarred from further...

  9. 41 CFR 60-300.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-300.68 Section 60-300.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... ineligible contractors. (a) Application for reinstatement. A contractor debarred from further contracts for...

  10. 41 CFR 60-250.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-250.68 Section 60-250.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... ineligible contractors. (a) Application for reinstatement. A contractor debarred from further contracts for...

  11. 48 CFR 52.246-1 - Contractor Inspection Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Inspection....246-1 Contractor Inspection Requirements. As prescribed in 46.301, insert the following clause: Contractor Inspection Requirements (APR 1984) The Contractor is responsible for performing or having...

  12. Reduction and fixation of cranial cervical fracture/luxations using screws and polymethylmethacrylate (PMMA) cement: a distraction technique applied to the base of the skull in thirteen dogs.

    PubMed

    Pike, Fred S; Kumar, M S A; Boudrieau, Randy J

    2012-02-01

    To (1) describe a surgical distraction technique for C1-2 cervical fractures/luxations or atlantoaxial (AA) subluxations using the base of the skull (basion of the foramen magnum) and either C2-3 or C3-4 for the purchase points of intraoperative axial distraction and (2) report outcome in 13 dogs. Retrospective case series. Dogs (n = 13). Medical records (September 1995-December 2005) of dogs with fracture/luxation of the cervical spine, or AA subluxations, were reviewed. Only dogs that had intraoperative linear distraction using the base of the skull as a purchase point for a self-retaining retractor were included. Signalment, presenting neurologic deficits, fracture location, and concurrent injury were recorded. Both short-term in-hospital follow-up, including healing and any complications, and long-term telephone follow-up were obtained. Realignment of the spinal vertebrae, reestablishing the normal properties of the spinal canal, was achieved after distraction in all dogs. Screws and small pins incorporated into polymethylmethacrylate cement were used to span the fracture ventrally and achieve rigid internal fixation. Eight dogs had a complete neurologic recovery, 2 dogs had slight residual ataxia, 2 dogs died, and 1 dog was lost to follow-up. Healing was good (mean, 7.5 weeks) or excellent (mean, 5.1 months) based on in-hospital follow-up (mean, 5.1 months). On final telephone follow-up (mean, 7.7 years), no dogs were reported to have had any associated problems or additional surgery. This surgical distraction technique was a reliable, relatively simple method to obtain reduction of fracture/luxations of C1-2 to re-align the spinal canal. Mortality in this series appears lower than that previously reported and supports surgical management of these injuries. © Copyright 2011 by The American College of Veterinary Surgeons.

  13. 48 CFR 52.241-5 - Contractor's Facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Facilities....241-5 Contractor's Facilities. As prescribed in 41.501(c)(4), insert a clause substantially the same as the following: Contractor's Facilities (FEB 1995) (a) The Contractor, at its expense, unless...

  14. 30 CFR 45.3 - Identification of independent contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Identification of independent contractors. 45.3... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.3 Identification of independent contractors. (a) Any independent contractor may obtain a permanent MSHA identification number. To obtain an identification number...

  15. 48 CFR 52.204-7 - Central Contractor Registration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Central Contractor....204-7 Central Contractor Registration. As prescribed in 4.1105, use the following clause: Central Contractor Registration (APR 2008) (a) Definitions. As used in this clause— Central Contractor Registration...

  16. 48 CFR 52.247-28 - Contractor's Invoices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Invoices. 52....247-28 Contractor's Invoices. As prescribed in 47.207-9(c), insert the following clause in... services: Contractor's Invoices (APR 1984) The Contractor shall submit itemized invoices as instructed by...

  17. 41 CFR 60-1.31 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-1.31 Section 60-1.31 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS General Enforcement; Compliance Review and Complaint Procedure § 60-1.31 Reinstatement of ineligible contractors. A contractor debarred from...

  18. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970.4403 insert the following clause: Contractor Purchasing System (AUG 2009) (a) General. The Contractor...

  19. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  20. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  1. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contractor business system... Business Systems 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...

  2. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractor business system... Business Systems 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...

  3. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractor business system... BUSINESS SYSTEMS 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...

  4. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractor business system... BUSINESS SYSTEMS 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...

  5. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Government contractors. 10.27 Section 10.27... INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a contract..., Criminal Penalties, any such contractor and any employee of the contractor are considered, in accordance...

  6. 14 CFR 1245.108 - License to contractor.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false License to contractor. 1245.108 Section... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor.... The license extends to the contractor's domestic subsidiaries and affiliates, if any, within the...

  7. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  8. 48 CFR 952.251-70 - Contractor employee travel discounts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employee travel... Contractor employee travel discounts. As prescribed in 951.7002, insert the following clause: Contractor Employee Travel Discounts (AUG 2009) (a) The Contractor shall take advantage of travel discounts offered to...

  9. 49 CFR 199.245 - Contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.245 Section 199.245... Prevention Program § 199.245 Contractor employees. (a) With respect to those covered employees who are contractors or employed by a contractor, an operator may provide by contract that the alcohol testing...

  10. 75 FR 66680 - Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ...-AG52 Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor... that contractors providing essential contractor services, as determined by the requiring activity..., implementing the requirements of DoDI 3020.37, Continuation of Essential DoD Contractor Services During Crises...

  11. 22 CFR 136.6 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Contractors. 136.6 Section 136.6 Foreign... Contractors. To the extent that contractors enjoy importation or tax privileges in a foreign country because... provisions in their contracts that require the contractors to observe the requirements of these regulations...

  12. 48 CFR 42.402 - Visits to contractors' facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Visits to contractors... contractors' facilities. (a) Government personnel planning to visit a contractor's facility in connection with... positions, and security clearances. (2) Date and duration of visit. (3) Name and address of contractor and...

  13. 29 CFR 500.60 - Farm labor contractors' recruitment, contractual and general obligations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Farm labor contractors' recruitment, contractual and... labor contractors' recruitment, contractual and general obligations. The Act imposes certain specific recruitment, contractual and general obligations on farm labor contractors and farm labor contractor employees...

  14. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  15. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  16. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  17. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  18. 48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., development, maintenance, and operation of Spanish-American installations and facilities. (b) The Contractor... this contract by reference. (c) The Contractor shall apply to the appropriate Spanish authorities for approval of status as a Direct Contractor in order to complete duty-free import of non-Spanish equipment...

  19. 38 CFR 46.8 - Independent contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Independent contractors... contractors. Independent contractors acting on behalf of the Department of Veterans Affairs are subject to the... provide the contractor with notice that a report of a clinical privileges action will be filed with the...

  20. 48 CFR 1252.242-71 - Contractor testimony.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor testimony. 1252... Contractor testimony. As prescribed in (TAR) 48 CFR 1242.7000(b), insert the following clause: Contractor Testimony (OCT 1994) All requests for the testimony of the Contractor or its employees, and any intention to...

  1. 78 FR 30233 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access... Government support contractors to have access to proprietary technical data belonging to prime contractors and other third parties, provided that the technical data owner may require the support contractor to...

  2. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.115 Section 199.115... § 199.115 Contractor employees. With respect to those employees who are contractors or employed by a contractor, an operator may provide by contract that the drug testing, education, and training required by...

  3. 48 CFR 1852.209-72 - Composition of the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor. 1852.209-72 Section 1852.209-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one legal...

  4. 40 CFR 35.938-6 - Progress payments to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Progress payments to contractors. 35... § 35.938-6 Progress payments to contractors. (a) Policy. EPA policy is that, except as State law otherwise provides, grantees should make prompt progress payments to prime contractors and prime contractors...

  5. 41 CFR 109-38.301-1 - Contractors' use.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Contractors' use. 109-38...-38.301-1 Contractors' use. Heads of field organizations shall ensure that provisions of the FPMR concerning contractor use of Government motor vehicles are complied with by their designated contractors. ...

  6. 7 CFR 1726.27 - Contractor's bonds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Contractor's bonds. 1726.27 Section 1726.27... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.27 Contractor's bonds. (a) RUS Form 168b, Contractor's Bond, shall be used when a contractor's bond is required by RUS Forms 200, 257...

  7. The Defense Base Act (DBA): The Federally Mandated Workers’ Compensation System for Overseas Government Contractors

    DTIC Science & Technology

    2010-04-09

    cost savings since adopting single-source models for their DBA insurance in which contractors for each agency are required to purchase insurance ...to (3) entities who set up a legally licensed insurance company, known generally as a captive insurer , to whom actuarially ... disability benefits. Because of this, KBR is essentially paying insurance on payroll that does not need to be insured because it can not, by law, be replaced

  8. Space plasma contractor research, 1988

    NASA Technical Reports Server (NTRS)

    Williams, John D.; Wilbur, Paul J.

    1989-01-01

    Results of experiments conducted on hollow cathode-based plasma contractors are reported. Specific tests in which attempts were made to vary plasma conditions in the simulated ionospheric plasma are described. Experimental results showing the effects of contractor flowrate and ion collecting surface size on contactor performance and contactor plasma plume geometry are presented. In addition to this work, one-dimensional solutions to spherical and cylindircal space-charge limited double-sheath problems are developed. A technique is proposed that can be used to apply these solutions to the problem of current flow through elongated double-sheaths that separate two cold plasmas. Two conference papers which describe the essential features of the plasma contacting process and present data that should facilitate calibration of comprehensive numerical models of the plasma contacting process are also included.

  9. 78 FR 24292 - Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... 199 corridor as part of the STAA network of truck routes. The project involves realigning curves... address provided above. The U.S. Fish and Wildlife Service consultation and Biological Opinion are...

  10. Veterans Employment Rights Realignment Act of 2009

    THOMAS, 111th Congress

    Rep. Herseth Sandlin, Stephanie [D-SD-At Large

    2009-02-13

    Senate - 05/20/2009 Received in the Senate and Read twice and referred to the Committee on Veterans' Affairs. (All Actions) Tracker: This bill has the status Passed HouseHere are the steps for Status of Legislation:

  11. Family learning research in museums: An emerging disciplinary matrix?

    NASA Astrophysics Data System (ADS)

    Ellenbogen, Kirsten M.; Luke, Jessica J.; Dierking, Lynn D.

    2004-07-01

    Thomas Kuhn's notion of a disciplinary matrix provides a useful framework for investigating the growth of research on family learning in and from museums over the last decade. To track the emergence of this disciplinary matrix we consider three issues. First are shifting theoretical perspectives that result in new shared language, beliefs, values, understandings, and assumptions about what counts as family learning. Second are realigning methodologies, driven by underlying disciplinary assumptions about how research in this arena is best conducted, what questions should be addressed, and criteria for valid and reliable evidence. Third is resituating the focus of our research to make the family central to what we study, reflecting a more holistic understanding of the family as an educational institution within larger learning infrastructure. We discuss research that exemplifies these three issues and demonstrates the ways in which shifting theoretical perspectives, realigning methodologies, and resituating research foci signal the existence of a nascent disciplinary matrix.

  12. Molecular reorientation of a nematic liquid crystal by thermal expansion

    PubMed Central

    Kim, Young-Ki; Senyuk, Bohdan; Lavrentovich, Oleg D.

    2012-01-01

    A unique feature of nematic liquid crystals is orientational order of molecules that can be controlled by electromagnetic fields, surface modifications and pressure gradients. Here we demonstrate a new effect in which the orientation of nematic liquid crystal molecules is altered by thermal expansion. Thermal expansion (or contraction) causes the nematic liquid crystal to flow; the flow imposes a realigning torque on the nematic liquid crystal molecules and the optic axis. The optical and mechanical responses activated by a simple temperature change can be used in sensing, photonics, microfluidic, optofluidic and lab-on-a-chip applications as they do not require externally imposed gradients of temperature, pressure, surface realignment, nor electromagnetic fields. The effect has important ramifications for the current search of the biaxial nematic phase as the optical features of thermally induced structural changes in the uniaxial nematic liquid crystal mimic the features expected of the biaxial nematic liquid crystal. PMID:23072803

  13. The X-38 Spacecraft Fault-Tolerant Avionics System

    NASA Technical Reports Server (NTRS)

    Kouba,Coy; Buscher, Deborah; Busa, Joseph

    2003-01-01

    In 1995 NASA began an experimental program to develop a reusable crew return vehicle (CRV) for the International Space Station. The purpose of the CRV was threefold: (i) to bring home an injured or ill crewmember; (ii) to bring home the entire crew if the Shuttle fleet was grounded; and (iii) to evacuate the crew in the case of an imminent Station threat (i.e., fire, decompression, etc). Built at the Johnson Space Center, were two approach and landing prototypes and one spacecraft demonstrator (called V201). A series of increasingly complex ground subsystem tests were completed, and eight successful high-altitude drop tests were achieved to prove the design concept. In this program, an unprecedented amount of commercial-off-the-shelf technology was utilized in this first crewed spacecraft NASA has built since the Shuttle program. Unfortunately, in 2002 the program was canceled due to changing Agency priorities. The vehicle was 80% complete and the program was shut down in such a manner as to preserve design, development, test and engineering data. This paper describes the X-38 V201 fault-tolerant avionics system. Based on Draper Laboratory's Byzantine-resilient fault-tolerant parallel processing system and their "network element" hardware, each flight computer exchanges information on a strict timescale to process input data, compare results, and issue voted vehicle output commands. Major accomplishments achieved in this development include: (i) a space qualified two-fault tolerant design using mostly COTS (hardware and operating system); (ii) a single event upset tolerant network element board, (iii) on-the-fly recovery of a failed processor; (iv) use of synched cache; (v) realignment of memory to bring back a failed channel; (vi) flight code automatically generated from the master measurement list; and (vii) built in-house by a team of civil servants and support contractors. This paper will present an overview of the avionics system and the hardware implementation, as well as the system software and vehicle command & telemetry functions. Potential improvements and lessons learned on this program are also discussed.

  14. Mixture design procedure for flexible base.

    DOT National Transportation Integrated Search

    2013-04-01

    This document provides information on mixture design requirements for a flexible base course. Sections : design requirements, job mix formula, contractor's responsibility, and engineer's responsibility. Tables : material requirements; requirements fo...

  15. 48 CFR 1809.670 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...

  16. 48 CFR 1809.670 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...

  17. 48 CFR 1809.670 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...

  18. 48 CFR 1809.670 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...

  19. 41 CFR 109-45.300-50 - Sales by designated contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contractors. 109-45.300-50 Section 109-45.300-50 Public Contracts and Property Management Federal Property... § 109-45.300-50 Sales by designated contractors. Sales of surplus contractor inventory will be conducted by designated contractors when heads of field organizations determine that it is in the best interest...

  20. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 4 Accounts 1 2010-01-01 2010-01-01 false Government contractors. 83.19 Section 83.19 Accounts... contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel... of this part to be applied to such system. Any such contractor and any employee of such contractor...

  1. 77 FR 33490 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-06

    ... for OMB Review; Comment Request; Application for a Farm Labor Contractor or Farm Labor Contractor..., ``Application for a Farm Labor Contractor or Farm Labor Contractor Employee Certificate of Registration,'' to..., certain vehicle and safety standards are required of farm labor contractor applicants and such data is...

  2. 48 CFR 2110.7002 - Contractor investment of FEGLI Program funds.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Contractor investment of FEGLI Program funds. (a) The Contractor is required to invest and reinvest all FEGLI... Contractor is required to credit income earned from its investment of FEGLI Program funds to the FEGLI... appropriate manner. If the Contractor fails to invest funds on hand, properly allocate investment income, or...

  3. 0-6621 : developing a mixture-based specification for flexible base.

    DOT National Transportation Integrated Search

    2012-08-01

    The Texas Department of Transportation : (TxDOT) currently utilizes Item 247, Flexible : Base, to specify a foundation course of flexible : base utilized in a pavement. Base materials are : not allowed to be used by the contractors until : the ...

  4. Straightening the Eyes Doesn't Rebalance the Brain

    PubMed Central

    Zhou, Jiawei; Wang, Yonghua; Feng, Lixia; Wang, Jiafeng; Hess, Robert F.

    2017-01-01

    Surgery to align the two eyes is commonly used in treating strabismus. However, the role of strabismic surgery on patients' binocular visual processing is not yet fully understood. In this study, we asked two questions: (1) Does realigning the eyes by strabismic surgery produce an immediate benefit to patients' sensory eye balance? (2) If not, is there a subsequent period of “alignment adaptation” akin to refractive adaptation where sensory benefits to binocular function accrue? Seventeen patients with strabismus (mean age: 17.06 ± 5.16 years old) participated in our experiment. All participants had normal or corrected to normal visual acuity (LogMAR < 0.10) in the two eyes. We quantitatively measured their sensory eye balance before and after surgery using a binocular phase combination paradigm. For the seven patients whose sensory eye balance was measured before surgery, we found no significant change [t(6) = −0.92; p = 0.39] in the sensory eye balance measured 0.5–1 months after the surgery, indicating that the surgical re-alignment didn't by itself produce any immediate benefit for sensory eye balance. To answer the second question, we measured 16 patients' sensory eye balance at around 5–12 months after their eyes had been surgically re-aligned and compared this with our measurements 0.5–1 months after surgery. We found no significant change [t(15) = −0.89; p = 0.39] in sensory eye balance 5–12 months after the surgery. These results suggest that strabismic surgery while being necessary is not itself sufficient for re-establishing balanced sensory eye dominance. PMID:28955214

  5. Colonization of UK coastal realignment sites by mosquitoes: implications for design, management, and public health.

    PubMed

    Medlock, J M; Vaux, A G C

    2013-06-01

    Coastal realignment is now widely instituted in the UK as part of local flood risk management plans to compensate for the loss of European protected habitat and to mitigate the effects of sea-level rise and coastal squeeze. Coastal aquatic habitats have long been known to provide suitable habitats for brackish-water mosquitoes and historically, coastal marshes were considered to support anopheline mosquito populations that were responsible for local malaria transmission. This study surveyed the eight largest managed realignment (MRA) sites in England (Essex and the Humber) for mosquito habitats. The apparent absence of anopheline mosquitoes exploiting aquatic habitats at all of these sites suggests that the risk of malaria associated with MRA sites is currently negligible. However, three of the eight sites supported populations of two nuisance and potential arboviral vector species, Aedes detritus and Aedes caspius. The aquatic habitats that supported mosquitoes resulted from a) specific design aspects of the new sea wall (ballast to mitigate wave action and constructed saline borrow ditches) that could be designed out or managed or b) isolated pools created through silt accretion or expansion of flooded zones to neighbouring pasture. The public health risks and recommendations for management are discussed in this report. This report highlights the need for pro-active public health impact assessments prior to MRA development in consultation with the Health Protection Agency, as well as the need for a case-by-case approach to design and management to mitigate mosquito or mosquito-borne disease issues now and in the future. © 2013 The Society for Vector Ecology.

  6. Effectuation of adaptive stability and postural alignment strategies are decreased by alcohol intoxication.

    PubMed

    Hafström, A; Modig, F; Magnusson, M; Fransson, P A

    2014-06-01

    Human stability control is a complex process comprising contributions from several partly independent mechanisms such as coordination, feedback and feed-forward control, and adaptation. Acute alcohol intoxication impairs these functions and is recognized as a major contributor to fall traumas. The study aimed to investigate how alcohol intoxication at .06% and .10% blood alcohol concentration (BAC) affected the movement spans and control of posture alignment. The angular positions of the head, shoulder, hip and knees relative to the ankles were measured with a 3D motion analysis system in 25 healthy adults during standing with eyes open or closed and with or without vibratory balance perturbations. Alcohol intoxication significantly increased the movement spans of the head, shoulders, hip and knees in anteroposterior and lateral directions during quiet stance (p < or = .047 and p < or = .003) and balance perturbations (p<.001, both directions). Alcohol intoxication also decreased the ability to reduce the movement spans through adaptation in both anteroposterior (p < or = .011) and lateral (p < or = .004) directions. When sober and submitted to balance perturbations, the subjects aligned the head, shoulders, hip and knees more forward relative to the ankle joint (p < .001), hence adopting a more resilient posture increasing the safety margin for backward falls. Alcohol intoxication significantly delayed this forward realignment (p < or = .022). Alcohol intoxication did not cause any significant posture realignment in the lateral direction. Thus, initiation of adaptive posture realignments to alcohol or other disruptions might be context dependent and associated with reaching a certain level of stability threats. Copyright © 2014 Elsevier B.V. All rights reserved.

  7. Community Environmental Response Facilitation Act (CERFA) report, Fort George G. Mead, Maryland. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schultheisz, D.; Ward, L.

    1994-04-01

    This report presents the results of the Community Environmental Response Facilitation Act (CERFA) investigation conducted by Environmental Resources Management (ERM) at Fort George G. Meade (FGGM), a U.S. Government property selected for closure by the Base Realignment and Closure (BRAC) Commission. Under CERFA, Federal agencies are required to expeditiously identify real property that can be immediately reused and redeveloped. Satisfying this objective requires the identification of real property where no hazardous substances or petroleum products, regulated by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), were stored for one year or more, known to have been released, or disposed.more » Fort George G. Meade, CERFA, Base closure, BRAC.« less

  8. Contractor’s mistakes during tendering

    NASA Astrophysics Data System (ADS)

    Kamil, A. I. M.; Othman, N.; Adnan, H.; Zaki, ZA M.

    2018-02-01

    The occurrence of overrun in cost and time in a project that is usually caused by contractors, will generally make peopleput the blameonthem. This happensas a result of the lack of knowledge possessed by the contractors in determining the solution to be undertakendue totheir mistakes, especially when it comes to tendering process as what had happened in the cases that were reported in Supreme Court of Canada. This paper aims to identify the types of mistakes, factors that contribute to the mistakes and the responsiveness to the mistakes so that the contractor will be able to manage and control the mistakes, as well as the solution, along with preventing them from happening, and in making decision whether or notthey may withdraw from the bidding when the fault has been discovered or whether they should request for leniency from the client for a second chance in re-submitting the bid after the discovered inaccuracy. This research has been done based on cases that were related to the contractor’s mistakes during tendering which were collected from the Supreme Courts of Canada. The data have been analysed and interpreted by legal methodology, in which the result shows that the ability level of the contractors to respond to the mistake is unsatisfactory,and the fault is continuouslybeingmade. The findings are expected to educate and provide awareness to the contractors relating to the matters discussed.

  9. 48 CFR 9.603 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.603 Policy. The Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and... encourage the dissolution of contractor team arrangements. ...

  10. 48 CFR 9.603 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.603 Policy. The Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and... encourage the dissolution of contractor team arrangements. ...

  11. 48 CFR 9.603 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.603 Policy. The Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and... encourage the dissolution of contractor team arrangements. ...

  12. 48 CFR 9.603 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.603 Policy. The Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and... encourage the dissolution of contractor team arrangements. ...

  13. 48 CFR 9.603 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.603 Policy. The Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and... encourage the dissolution of contractor team arrangements. ...

  14. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., prior to such employee's engagement in any activity enumerated in section 3(6) of the Act. A farm labor... farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm...

  15. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., prior to such employee's engagement in any activity enumerated in section 3(6) of the Act. A farm labor... farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm...

  16. 10 CFR 727.6 - What are the obligations of a DOE contractor?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or other...

  17. 10 CFR 727.6 - What are the obligations of a DOE contractor?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or other...

  18. 10 CFR 727.6 - What are the obligations of a DOE contractor?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or other...

  19. 42 CFR 455.202 - Limitation on contractor liability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Limitation on contractor liability. 455.202 Section... § 455.202 Limitation on contractor liability. (a) A program contractor, a person, or an entity employed... contractor will not be held to have violated any criminal law and will not be held liable in any civil action...

  20. 10 CFR 727.6 - What are the obligations of a DOE contractor?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or other...

  1. 10 CFR 727.6 - What are the obligations of a DOE contractor?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or other...

  2. Hubbell Metropolitan Development Fund I, LLC

    EPA Pesticide Factsheets

    The EPA is providing notice of a proposed Administrative Penalty Assessment against Hubbell Metropolitan Development Fund I, LLC, for alleged violations at the SE Westown Parkway realignment, near the intersection of R22, and undertaken as part of the Glyn

  3. 76 FR 13508 - Ninth Coast Guard District Sector Realignment; Northern Lake Michigan and Lake Huron

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-14

    ... Station Alpena from Group Sault Ste. Marie to Sectors Lake Michigan and Detroit, respectively. That... boundary adjustment is that Stations Charlevoix and Alpena will be reassigned to Sector Sault Ste. Marie...

  4. Community Options Model): Using Artificial Intelligence for Transportation Planning and Community Decision Making

    DOT National Transportation Integrated Search

    1997-01-01

    This paper describes the Community Options Model for Transportation-Related Issues (COMTRI) designed to estimate the social and economic impacts of highway realignments on rural Michigan communities for the Michigan Department of Transportation (MDOT...

  5. Shale embankment construction criteria : experimental feature interim report.

    DOT National Transportation Integrated Search

    1985-06-01

    The research was conducted in the summer of 1983 during the realignment construction of the Mystic Creek - Camas Valley section on the Coos Bay - Roseburg Highway. Construction is still in progress. As outlined in the experimental features work plan ...

  6. Realignment of the Army Government Purchase Card Program in Japan

    DTIC Science & Technology

    2014-06-01

    REDUNDANCIES .........................................................................................28  1.  A/ OPC Bank Setup...28  2.  A/ OPC Training Records ..................................................................29...Air Force instructions AIM Authorization, Issuance, and Maintenance A/ OPC agency/organizational program coordinator AO approving official BO

  7. Digging West Oakland : what archaeologists found under the Cypress Freeway.

    DOT National Transportation Integrated Search

    2005-01-01

    In 1989, the Loma Prieta earthquake destroyed 1.25 miles of the double-deck Cypress Freeway in Oakland, California. In realigning and rebuilding the freeway, the California Department of Transportation (Caltrans) undertook to identify any important a...

  8. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that... event the notice is inadequate to make a decision, advise the Contractor what additional information is...

  9. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that... event the notice is inadequate to make a decision, advise the Contractor what additional information is...

  10. 48 CFR 970.4402 - Contractor purchasing system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402 Contractor purchasing system. ...

  11. 48 CFR 1845.502 - Contractor responsibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor responsibility. 1845.502 Section 1845.502 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Contractors 1845.502 Contractor responsibility. ...

  12. Realignment Surgery for Malunited Ankle Fracture.

    PubMed

    Guo, Chang-Jun; Li, Xing-Cheng; Hu, Mu; Xu, Yang; Xu, Xiang-Yang

    2017-02-01

    To investigate the characteristics and the results of realignment surgery for the treatment of malunited ankle fracture. Thirty-three patients with malunited fractures of the ankle who underwent reconstructive surgery at our hospital from January 2010 to January 2014 were reviewed. The tibial anterior surface angle (TAS), the tibiotalar tilt angle (TTA), the malleolar angle (MA), and the tibial lateral surface angle (TLS) were measured. Clinical assessment was performed with use of the American Orthopaedic Foot and Ankle Society (AOFAS) scale and visual analogue scale (VAS) scores, and the osteoarthritis stage was determined radiographically with the modified Takakura classification system. The Wilcoxon matched-pairs test was used to analyze the difference between the preoperative and the postoperative data. The mean follow-up was 36 months (range, 20-60 months). The mean age at the time of realignment surgery was 37.1 years (range, 18-62 years). Compared with preoperation, the TAS at the last follow-up showed a significant increase (88.50° ± 4.47° vs. 90.80° ± 3.49°, P = 0.0035); similar results were observed in TTA (1.62° ± 1.66° vs. 0.83° ± 0.90°, P < 0.01) and MA (82.30° ± 8.03° vs. 78.70° ± 4.76°, P = 0.005). At the last follow-up, the mean AOFAS score was significantly increased compared with the score at preoperation (44.5 ± 13.7 vs. 78.0 ± 8.9, P < 0.01). Significant differences in VAS scores were found at the last follow-up (6.76 ± 1.03 vs. 2.03 ± 1.21, P < 0.01). There was no significant difference in the Takakura grade between the preoperation and the last follow-up. One patient had increased talar tilt postsurgery; the postoperative talar tilt angle of this patient was 20°. One patient had progressive ankle osteoarthritis, and was treated by ankle joint distraction. Realignment surgery for a malunited ankle fracture can reduce pain, improve function, and delay ankle arthrodesis or total ankle replacement. Postoperative large talar tilt and advanced stages of ankle arthritis are the risk factors for the surgery. © 2017 Chinese Orthopaedic Association and John Wiley & Sons Australia, Ltd.

  13. The Defense Base Act (DBA): The Federally Mandated Workers’ Compensation System for Overseas Government Contractors

    DTIC Science & Technology

    2010-06-02

    savings since adopting single-source models for their DBA insurance in which contractors for each agency are required to purchase insurance from a single...set up a legally licensed insurance company, known generally as a captive insurer , to whom actuarially determined premiums are paid but ownership of...the cap that will not be replaced by DBA disability benefits. Because of this, KBR is essentially paying insurance on payroll that does not need to

  14. Institutional environmental impact statement, Michoud Assembly Facility, New Orleans, Louisiana

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A description and analysis of Michoud Assembly Facility as an operational base for both NASA and NASA-related programs and various government tenant-agencies and their contractors is given. Tenant-agencies are governmental agencies or governmental agency contractors which are not involved in a NASA program, but utilize office or manufacturing space at the Michoud Assembly Facility. The statements represent the full description of the likely environmental effects of the facility and are used in the process of making program and project decisions.

  15. 48 CFR 908.7101-7 - Government license tags.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... online vehicle license tag ordering data base. Contractors must obtain approval from their Federal fleet manager or OPMO for authorization to utilize the UNICOR data base. Director, Personal Property Policy...

  16. 28 CFR 115.277 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... Corrective action for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse... contractor or volunteer. ...

  17. 28 CFR 115.277 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... Corrective action for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse... contractor or volunteer. ...

  18. 28 CFR 115.277 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... Corrective action for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse... contractor or volunteer. ...

  19. Aligning compensation with education: design and implementation of the Educational Value Unit (EVU) system in an academic internal medicine department.

    PubMed

    Stites, Steven; Vansaghi, Lisa; Pingleton, Susan; Cox, Glendon; Paolo, Anthony

    2005-12-01

    The authors report the development of a new metric for distributing university funds to support faculty efforts in education in the department of internal medicine at the University of Kansas School of Medicine. In 2003, a committee defined the educational value unit (EVU), which describes and measures the specific types of educational work done by faculty members, such as core education, clinical teaching, and administration of educational programs. The specific work profile of each faculty member was delineated. A dollar value was calculated for each 0.1 EVU. The metric was prospectively applied and a faculty survey was performed to evaluate the faculty's perception of the metric. Application of the metric resulted in a decrease in university support for 34 faculty and an increase in funding for 23 faculty. Total realignment of funding was US$1.6 million, or an absolute value of US$29,072 +/- 38,320.00 in average shift of university salary support per faculty member. Survey results showed that understanding of the purpose of university funding was enhanced, and that faculty members perceived a more equitable alignment of teaching effort with funding. The EVU metric resulted in a dramatic realignment of university funding for educational efforts in the department of internal medicine. The metric was easily understood, quickly implemented, and perceived to be fair by the faculty. By aligning specific salary support with faculty's educational responsibilities, a foundation was created for applying mission-based incentive programs.

  20. Physical therapy mandates by Medicare administrative contractors: effective or wasteful?

    PubMed

    Fehring, Thomas K; Fehring, Keith; Odum, Susan M; Halsey, David

    2013-10-01

    Documentation of medical necessity for arthroplasty has come under scrutiny by Medicare. In some jurisdictions three months of physical therapy prior to arthroplasty has been mandated. The purpose of this study was to determine the efficacy and cost of this policy to treat advanced osteoarthritis. A systematic review was performed to assimilate efficacy data for physical therapy in patients with advanced osteoarthritis. The number of arthroplasties performed annually was obtained to calculate cost. Evidence-based studies documenting the efficacy of physical therapy in treating advanced arthritis are lacking with a potential cost of 36-68 million dollars. Physical therapy mandates by administrative contractors are not only ineffective but are costly without patient benefit. Medical necessity documentation should be driven by orthopedists not retroactively by Medicare contractors. Copyright © 2013 Elsevier Inc. All rights reserved.

Top