Sample records for based risk management

  1. Site-Based Management: Implications for Risk Management?

    ERIC Educational Resources Information Center

    Dunklee, Dennis R.

    1990-01-01

    Site-based school management opens the possibility of problems in districtwide risk management and liability prevention programs. Describes a program to transfer prevention law and risk management strategies to individual school sites. Cautions that only duly authorized agents of local school boards can commit boards to contractual obligations.…

  2. Equipment management risk rating system based on engineering endpoints.

    PubMed

    James, P J

    1999-01-01

    The equipment management risk ratings system outlined here offers two significant departures from current practice: risk classifications are based on intrinsic device risks, and the risk rating system is based on engineering endpoints. Intrinsic device risks are categorized as physical, clinical and technical, and these flow from the incoming equipment assessment process. Engineering risk management is based on verification of engineering endpoints such as clinical measurements or energy delivery. This practice eliminates the ambiguity associated with ranking risk in terms of physiologic and higher-level outcome endpoints such as no significant hazards, low significance, injury, or mortality.

  3. Behavior-Based Safety and Occupational Risk Management

    ERIC Educational Resources Information Center

    Geller, E. Scott

    2005-01-01

    The behavior-based approach to managing occupational risk and preventing workplace injuries is reviewed. Unlike the typical top-down control approach to industrial safety, behavior-based safety (BBS) provides tools and procedures workers can use to take personal control of occupational risks. Strategies the author and his colleagues have been…

  4. The Research on Safety Management Information System of Railway Passenger Based on Risk Management Theory

    NASA Astrophysics Data System (ADS)

    Zhu, Wenmin; Jia, Yuanhua

    2018-01-01

    Based on the risk management theory and the PDCA cycle model, requirements of the railway passenger transport safety production is analyzed, and the establishment of the security risk assessment team is proposed to manage risk by FTA with Delphi from both qualitative and quantitative aspects. The safety production committee is also established to accomplish performance appraisal, which is for further ensuring the correctness of risk management results, optimizing the safety management business processes and improving risk management capabilities. The basic framework and risk information database of risk management information system of railway passenger transport safety are designed by Ajax, Web Services and SQL technologies. The system realizes functions about risk management, performance appraisal and data management, and provides an efficient and convenient information management platform for railway passenger safety manager.

  5. Practice management based on risk assessment.

    PubMed

    Sandberg, Hans

    2004-01-01

    The management of a dental practice is most often focused on what clinicians do (production of items), and not so much on what is achieved in terms of oral health. The main reason for this is probably that it is easier to measure production and more difficult to measure health outcome. This paper presents a model based on individual risk assessment that aims to achieve a financially sound economy and good oral health. The close-to-the-clinic management tool, the HIDEP Model (Health Improvement in a DEntal Practice) was pioneered initially in Sweden at the end of 1980s. The experience over a 15-year period with different elements of the model is presented, including: the basis of examination and risk assessment; motivation; task delegation and leadership issues; health-finance evaluations; and quality development within a dental clinic. DentiGroupXL, a software program designed to support the work based on the model, is also described.

  6. Risk-based management of invading plant disease.

    PubMed

    Hyatt-Twynam, Samuel R; Parnell, Stephen; Stutt, Richard O J H; Gottwald, Tim R; Gilligan, Christopher A; Cunniffe, Nik J

    2017-05-01

    Effective control of plant disease remains a key challenge. Eradication attempts often involve removal of host plants within a certain radius of detection, targeting asymptomatic infection. Here we develop and test potentially more effective, epidemiologically motivated, control strategies, using a mathematical model previously fitted to the spread of citrus canker in Florida. We test risk-based control, which preferentially removes hosts expected to cause a high number of infections in the remaining host population. Removals then depend on past patterns of pathogen spread and host removal, which might be nontransparent to affected stakeholders. This motivates a variable radius strategy, which approximates risk-based control via removal radii that vary by location, but which are fixed in advance of any epidemic. Risk-based control outperforms variable radius control, which in turn outperforms constant radius removal. This result is robust to changes in disease spread parameters and initial patterns of susceptible host plants. However, efficiency degrades if epidemiological parameters are incorrectly characterised. Risk-based control including additional epidemiology can be used to improve disease management, but it requires good prior knowledge for optimal performance. This focuses attention on gaining maximal information from past epidemics, on understanding model transferability between locations and on adaptive management strategies that change over time. © 2017 The Authors. New Phytologist © 2017 New Phytologist Trust.

  7. Worksite-based cardiovascular risk screening and management: a feasibility study.

    PubMed

    Padwal, Raj; Rashead, Mohammad; Snider, Jonathan; Morrin, Louise; Lehman, Agnes; Campbell, Norm Rc

    2017-01-01

    Established cardiovascular risk factors are highly prevalent and contribute substantially to cardiovascular morbidity and mortality because they remain uncontrolled in many Canadians. Worksite-based cardiovascular risk factor screening and management represent a largely untapped strategy for optimizing risk factor control. In a 2-phase collaborative demonstration project between Alberta Health Services (AHS) and the Alberta Newsprint Company (ANC), ANC employees were offered cardiovascular risk factor screening and management. Screening was performed at the worksite by AHS nurses, who collected baseline history, performed automated blood pressure measurement and point-of-care testing for lipids and A1c, and calculated 10-year Framingham risk. Employees with a Framingham risk score of ≥10% and uncontrolled blood pressure, dyslipidemia, or smoking were offered 6 months of pharmacist case management to optimize their risk factor control. In total, 87 of 190 (46%) employees volunteered to undergo cardiovascular risk factor screening. Mean age was 44.5±11.9 years, 73 (83.9%) were male, 14 (16.1%) had hypertension, 4 (4.6%) had diabetes, 12 (13.8%) were current smokers, and 9 (10%) had dyslipidemia. Of 36 employees with an estimated Framingham risk score of ≥10%, 21 (58%) agreed to receive case management and 15 (42%) attended baseline and 6-month follow-up case management visits. Statistically significant reductions in left arm systolic blood pressure (-8.0±12.4 mmHg; p =0.03) and triglyceride levels (-0.8±1.4 mmol/L; p =0.04) occurred following case management. These findings demonstrate the feasibility and usefulness of collaborative, worksite-based cardiovascular risk factor screening and management. Expansion of this type of partnership in a cost-effective manner is warranted.

  8. Time-based collision risk modeling for air traffic management

    NASA Astrophysics Data System (ADS)

    Bell, Alan E.

    Since the emergence of commercial aviation in the early part of last century, economic forces have driven a steadily increasing demand for air transportation. Increasing density of aircraft operating in a finite volume of airspace is accompanied by a corresponding increase in the risk of collision, and in response to a growing number of incidents and accidents involving collisions between aircraft, governments worldwide have developed air traffic control systems and procedures to mitigate this risk. The objective of any collision risk management system is to project conflicts and provide operators with sufficient opportunity to recognize potential collisions and take necessary actions to avoid them. It is therefore the assertion of this research that the currency of collision risk management is time. Future Air Traffic Management Systems are being designed around the foundational principle of four dimensional trajectory based operations, a method that replaces legacy first-come, first-served sequencing priorities with time-based reservations throughout the airspace system. This research will demonstrate that if aircraft are to be sequenced in four dimensions, they must also be separated in four dimensions. In order to separate aircraft in four dimensions, time must emerge as the primary tool by which air traffic is managed. A functional relationship exists between the time-based performance of aircraft, the interval between aircraft scheduled to cross some three dimensional point in space, and the risk of collision. This research models that relationship and presents two key findings. First, a method is developed by which the ability of an aircraft to meet a required time of arrival may be expressed as a robust standard for both industry and operations. Second, a method by which airspace system capacity may be increased while maintaining an acceptable level of collision risk is presented and demonstrated for the purpose of formulating recommendations for procedures

  9. A Risk-based Assessment And Management Framework For Multipollutant Air Quality

    PubMed Central

    Frey, H. Christopher; Hubbell, Bryan

    2010-01-01

    The National Research Council recommended both a risk- and performance-based multipollutant approach to air quality management. Specifically, management decisions should be based on minimizing the exposure to, and risk of adverse effects from, multiple sources of air pollution and that the success of these decisions should be measured by how well they achieved this objective. We briefly describe risk analysis and its application within the current approach to air quality management. Recommendations are made as to how current practice could evolve to support a fully risk- and performance-based multipollutant air quality management system. The ability to implement a risk assessment framework in a credible and policy-relevant manner depends on the availability of component models and data which are scientifically sound and developed with an understanding of their application in integrated assessments. The same can be said about accountability assessments used to evaluate the outcomes of decisions made using such frameworks. The existing risk analysis framework, although typically applied to individual pollutants, is conceptually well suited for analyzing multipollutant management actions. Many elements of this framework, such as emissions and air quality modeling, already exist with multipollutant characteristics. However, the framework needs to be supported with information on exposure and concentration response relationships that result from multipollutant health studies. Because the causal chain that links management actions to emission reductions, air quality improvements, exposure reductions and health outcomes is parallel between prospective risk analyses and retrospective accountability assessments, both types of assessment should be placed within a single framework with common metrics and indicators where possible. Improvements in risk reductions can be obtained by adopting a multipollutant risk analysis framework within the current air quality management

  10. Early childhood caries: risk-based disease prevention and management.

    PubMed

    Ng, Man Wai; Chase, Isabelle

    2013-01-01

    Early childhood caries (ECC), common in preschoolers, can lead to pain and infection if left untreated. Yet, ECC is largely preventable, and if it is identified early and the responsible risk factors are addressed, its progression can be halted or slowed. This article reviews the rationale for a first dental visit by age 1 year, caries risk assessment, and risk-based prevention and management of ECC and discusses strategies for providers to implement these contemporary evidence-based concepts into clinical practice. Copyright © 2013 Elsevier Inc. All rights reserved.

  11. Managing wildfire events: risk-based decision making among a group of federal fire managers

    Treesearch

    Robyn S. Wilson; Patricia L. Winter; Lynn A. Maguire; Timothy Ascher

    2011-01-01

    Managing wildfire events to achieve multiple management objectives involves a high degree of decision complexity and uncertainty, increasing the likelihood that decisions will be informed by experience-based heuristics triggered by available cues at the time of the decision. The research reported here tests the prevalence of three risk-based biases among 206...

  12. Risk-based requirements management framework with applications to assurance cases

    NASA Astrophysics Data System (ADS)

    Feng, D.; Eyster, C.

    The current regulatory approach for assuring device safety primarily focuses on compliance with prescriptive safety regulations and relevant safety standards. This approach, however, does not always lead to a safe system design even though safety regulations and standards have been met. In the medical device industry, several high profile recalls involving infusion pumps have prompted the regulatory agency to reconsider how device safety should be managed, reviewed and approved. An assurance case has been cited as a promising tool to address this growing concern. Assurance cases have been used in safety-critical systems for some time. Most assurance cases, if not all, in literature today are developed in an ad hoc fashion, independent from risk management and requirement development. An assurance case is a resource-intensive endeavor that requires additional effort and documentation from equipment manufacturers. Without a well-organized requirements infrastructure in place, such “ additional effort” can be substantial, to the point where the cost of adoption outweighs the benefit of adoption. In this paper, the authors present a Risk-Based Requirements and Assurance Management (RBRAM) methodology. The RBRAM is an elaborate framework that combines Risk-Based Requirements Management (RBRM) with assurance case methods. Such an integrated framework can help manufacturers leverage an existing risk management to present a comprehensive assurance case with minimal additional effort while providing a supplementary means to reexamine the integrity of the system design in terms of the mission objective. Although the example used is from the medical industry, the authors believe that the RBRAM methodology underlines the fundamental principle of risk management, and offers a simple, yet effective framework applicable to aerospace industry, perhaps, to any industry.

  13. Development of risk-based air quality management strategies under impacts of climate change.

    PubMed

    Liao, Kuo-Jen; Amar, Praveen; Tagaris, Efthimios; Russell, Armistead G

    2012-05-01

    Climate change is forecast to adversely affect air quality through perturbations in meteorological conditions, photochemical reactions, and precursor emissions. To protect the environment and human health from air pollution, there is an increasing recognition of the necessity of developing effective air quality management strategies under the impacts of climate change. This paper presents a framework for developing risk-based air quality management strategies that can help policy makers improve their decision-making processes in response to current and future climate change about 30-50 years from now. Development of air quality management strategies under the impacts of climate change is fundamentally a risk assessment and risk management process involving four steps: (1) assessment of the impacts of climate change and associated uncertainties; (2) determination of air quality targets; (3) selections of potential air quality management options; and (4) identification of preferred air quality management strategies that minimize control costs, maximize benefits, or limit the adverse effects of climate change on air quality when considering the scarcity of resources. The main challenge relates to the level of uncertainties associated with climate change forecasts and advancements in future control measures, since they will significantly affect the risk assessment results and development of effective air quality management plans. The concept presented in this paper can help decision makers make appropriate responses to climate change, since it provides an integrated approach for climate risk assessment and management when developing air quality management strategies. Development of climate-responsive air quality management strategies is fundamentally a risk assessment and risk management process. The risk assessment process includes quantification of climate change impacts on air quality and associated uncertainties. Risk management for air quality under the impacts of

  14. Risk-based principles for defining and managing water security

    PubMed Central

    Hall, Jim; Borgomeo, Edoardo

    2013-01-01

    The concept of water security implies concern about potentially harmful states of coupled human and natural water systems. Those harmful states may be associated with water scarcity (for humans and/or the environment), floods or harmful water quality. The theories and practices of risk analysis and risk management have been developed and elaborated to deal with the uncertain occurrence of harmful events. Yet despite their widespread application in public policy, theories and practices of risk management have well-known limitations, particularly in the context of severe uncertainties and contested values. Here, we seek to explore the boundaries of applicability of risk-based principles as a means of formalizing discussion of water security. Not only do risk concepts have normative appeal, but they also provide an explicit means of addressing the variability that is intrinsic to hydrological, ecological and socio-economic systems. We illustrate the nature of these interconnections with a simulation study, which demonstrates how water resources planning could take more explicit account of epistemic uncertainties, tolerability of risk and the trade-offs in risk among different actors. PMID:24080616

  15. Introducing Risk Management Techniques Within Project Based Software Engineering Courses

    NASA Astrophysics Data System (ADS)

    Port, Daniel; Boehm, Barry

    2002-03-01

    In 1996, USC switched its core two-semester software engineering course from a hypothetical-project, homework-and-exam course based on the Bloom taxonomy of educational objectives (knowledge, comprehension, application, analysis, synthesis, and evaluation). The revised course is a real-client team-project course based on the CRESST model of learning objectives (content understanding, problem solving, collaboration, communication, and self-regulation). We used the CRESST cognitive demands analysis to determine the necessary student skills required for software risk management and the other major project activities, and have been refining the approach over the last 5 years of experience, including revised versions for one-semester undergraduate and graduate project course at Columbia. This paper summarizes our experiences in evolving the risk management aspects of the project course. These have helped us mature more general techniques such as risk-driven specifications, domain-specific simplifier and complicator lists, and the schedule as an independent variable (SAIV) process model. The largely positive results in terms of review of pass / fail rates, client evaluations, product adoption rates, and hiring manager feedback are summarized as well.

  16. Web based collaborative decision making in flood risk management

    NASA Astrophysics Data System (ADS)

    Evers, Mariele; Almoradie, Adrian; Jonoski, Andreja

    2014-05-01

    Stakeholder participation in the development of flood risk management (FRM) plans is essential since stakeholders often have a better understanding or knowledge of the potentials and limitation of their local area. Moreover, a participatory approach also creates trust amongst stakeholders, leading to a successful implementation of measures. Stakeholder participation however has its challenges and potential pitfalls that could lead to its premature termination. Such challenges and pitfalls are the limitation of financial resources, stakeholders' spatial distribution and their interest to participate. Different type of participation in FRM may encounter diverse challenges. These types of participation in FRM can be classified into (1) Information and knowledge sharing (IKS), (2) Consultative participation (CP) or (3) Collaborative decision making (CDM)- the most challenging type of participation. An innovative approach to address these challenges and potential pitfalls is a web-based mobile or computer-aided environment for stakeholder participation. This enhances the remote interaction between participating entities such as stakeholders. This paper presents a developed framework and an implementation of CDM web based environment for the Alster catchment (Hamburg, Germany) and Cranbrook catchment (London, UK). The CDM framework consists of two main stages: (1) Collaborative modelling and (2) Participatory decision making. This paper also highlights the stakeholder analyses, modelling approach and application of General Public License (GPL) technologies in developing the web-based environments. Actual test and evaluation of the environments was through series of stakeholders workshops. The overall results based from stakeholders' evaluation shows that web-based environments can address the challenges and potential pitfalls in stakeholder participation and it enhances participation in flood risk management. The web-based environment was developed within the DIANE

  17. Applicability of risk-based management and the need for risk-based economic decision analysis at hazardous waste contaminated sites.

    PubMed

    Khadam, Ibrahim; Kaluarachchi, Jagath J

    2003-07-01

    Decision analysis in subsurface contamination management is generally carried out through a traditional engineering economic viewpoint. However, new advances in human health risk assessment, namely, the probabilistic risk assessment, and the growing awareness of the importance of soft data in the decision-making process, require decision analysis methodologies that are capable of accommodating non-technical and politically biased qualitative information. In this work, we discuss the major limitations of the currently practiced decision analysis framework, which evolves around the definition of risk and cost of risk, and its poor ability to communicate risk-related information. A demonstration using a numerical example was conducted to provide insight on these limitations of the current decision analysis framework. The results from this simple ground water contamination and remediation scenario were identical to those obtained from studies carried out on existing Superfund sites, which suggests serious flaws in the current risk management framework. In order to provide a perspective on how these limitations may be avoided in future formulation of the management framework, more matured and well-accepted approaches to decision analysis in dam safety and the utility industry, where public health and public investment are of great concern, are presented and their applicability in subsurface remediation management is discussed. Finally, in light of the success of the application of risk-based decision analysis in dam safety and the utility industry, potential options for decision analysis in subsurface contamination management are discussed.

  18. An obesity/cardiometabolic risk reduction disease management program: a population-based approach.

    PubMed

    Villagra, Victor G

    2009-04-01

    Obesity is a critical health concern that has captured the attention of public and private healthcare payers who are interested in controlling costs and mitigating the long-term economic consequences of the obesity epidemic. Population-based approaches to obesity management have been proposed that take advantage of a chronic care model (CCM), including patient self-care, the use of community-based resources, and the realization of care continuity through ongoing communications with patients, information technology, and public policy changes. Payer-sponsored disease management programs represent an important conduit to delivering population-based care founded on similar CCM concepts. Disease management is founded on population-based disease identification, evidence-based care protocols, and collaborative practices between clinicians. While substantial clinician training, technology infrastructure commitments, and financial support at the payer level will be needed for the success of disease management programs in obesity and cardiometabolic risk reduction, these barriers can be overcome with the proper commitment. Disease management programs represent an important tool to combat the growing societal risks of overweight and obesity.

  19. Prototype development of a web-based participative decision support platform in risk management

    NASA Astrophysics Data System (ADS)

    Aye, Zar Chi; Olyazadeh, Roya; Jaboyedoff, Michel; Derron, Marc-Henri

    2014-05-01

    This paper discusses the proposed background architecture and prototype development of an internet-based decision support system (DSS) in the field of natural hazards and risk management using open-source geospatial software and web technologies. It is based on a three-tier, client-server architecture with the support of boundless (opengeo) framework and its client side SDK application environment using customized gxp components and data utility classes. The main purpose of the system is to integrate the workflow of risk management systematically with the diverse involvement of stakeholders from different organizations dealing with natural hazards and risk for evaluation of management measures through the active online participation approach. It aims to develop an adaptive user friendly, web-based environment that allows the users to set up risk management strategies based on actual context and data by integrating web-GIS and DSS functionality associated with process flow and other visualization tools. Web-GIS interface has been integrated within the DSS to deliver maps and provide certain geo-processing capabilities on the web, which can be easily accessible and shared by different organizations located in case study sites of the project. This platform could be envisaged not only as a common web-based platform for the centralized sharing of data such as hazard maps, elements at risk maps and additional information but also to ensure an integrated platform of risk management where the users could upload data, analyze risk and identify possible alternative scenarios for risk reduction especially for floods and landslides, either quantitatively or qualitatively depending on the risk information provided by the stakeholders in case study regions. The level of involvement, access to and interaction with the provided functionality of the system varies depending on the roles and responsibilities of the stakeholders, for example, only the experts (planners, geological

  20. Review of ecological-based risk management approaches used at five Army Superfund sites.

    PubMed

    Poucher, Sherri L; Tracey, Gregory A; Johnson, Mark S; Haines, Laurie B

    2012-04-01

    Factors used in environmental remedial decision making concerning ecological risk are not well understood or necessarily consistent. Recent Records of Decision (RODs) for Army CERCLA sites were reviewed to select case studies where remedial management occurred in response to ecological risks. Thirty-four Army RODs were evaluated representing decisions promulgated between 1996 and 2004. Five were selected based on assessments that remedial actions were clearly linked to concern for ecological receptors. The Ecological Risk Assessment (ERA) approach and the subsequent risk management process were reviewed for each site. The case studies demonstrated that the ERA findings, as well as critical management decisions regarding interpretation of identified ecological risks, were determinants of remedial action objectives. Decisions regarding the selection of remedial alternatives were based on a set of criteria prescribed by Superfund requirements and guidance. Remedial alternative evaluations require protection of human health and the environment, but protective conditions were determined using different methods at each site. Examining the remedial management process for the 5 case study sites revealed that uncertainty in the risk assessment and decisions regarding appropriate spatial scales for both risk assessment and remediation were important factors influencing remedial action decisions. The case reviews also revealed that levels of documentation were variable from site to site. In the future, more detailed documentation of decision criteria and the development of criteria that consider the resilience of the site will result in more technically defensible ecological risk management. Copyright © 2011 SETAC.

  1. Evidence-based disease management: its role in cardiovascular risk reduction.

    PubMed

    Fanning, Etta L

    2004-01-01

    Cardiovascular disease remains the most pressing healthcare problem in the United States. Traditional risk factors--hypertension, obesity, and diabetes-are still unresolved issues; and new risk factors--pre-diabetes, insulin resistance, and pediatric and adolescent diabetes-have emerged. There is an urgent need to identify the risk factors for cardiovascular disease, and address risk reduction with disease management and treatment for each factor, based on qualitative and quantitative approaches for developing the evidence base for public health action. The objectives of this paper are to review (i) the burden of cardiovascular illness-morbidity, mortality, and cost; (ii) risk factors and the emerging epidemic of adolescent obesity; (iii) the challenges of attaining target endpoints; and (iv) the attributes of a successful programmatic healthcare initiative for potential impact on cardiovascular care and, eventually, public health.

  2. Examining the Perceived Value of Integration of Earned Value Management with Risk Management-Based Performance Measurement Baseline

    ERIC Educational Resources Information Center

    Shah, Akhtar H.

    2014-01-01

    Many projects fail despite the use of evidence-based project management practices such as Performance Measurement Baseline (PMB), Earned Value Management (EVM) and Risk Management (RM). Although previous researchers have found that integrated project management techniques could be more valuable than the same techniques used by themselves, these…

  3. The role of risk-based prioritization in total quality management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bennett, C.T.

    1994-10-01

    The climate in which government managers must make decisions grows more complex and uncertain. All stakeholders - the public, industry, and Congress - are demanding greater consciousness, responsibility, and accountability of programs and their budgets. Yet, managerial decisions have become multifaceted, involve greater risk, and operate over much longer time periods. Over the last four or five decades, as policy analysis and decisions became more complex, scientists from psychology, operations research, systems science, and economics have developed a more or less coherent process called decision analysis to aid program management. The process of decision analysis - a systems theoretic approachmore » - provides the backdrop for this paper. The Laboratory Integrated Prioritization System (LIPS) has been developed as a systems analytic and risk-based prioritization tool to aid the management of the Tri-Labs` (Lawrence Livermore, Los Alamos, and Sandia) operating resources. Preliminary analyses of the effects of LIPS has confirmed the practical benefits of decision and systems sciences - the systematic, quantitative reduction in uncertainty. To date, the use of LIPS - and, hence, its value - has been restricted to resource allocation within the Tri-Labs` operations budgets. This report extends the role of risk-based prioritization to the support of DOE Total Quality Management (TQM) programs. Furthermore, this paper will argue for the requirement to institutionalize an evolutionary, decision theoretic approach to the policy analysis of the Department of Energy`s Program Budget.« less

  4. Spatially based management of agricultural phosphorus pollution from diffuse sources: the SCIMAP risk based approach

    NASA Astrophysics Data System (ADS)

    Reaney, S. M.; Heathwaite, L.; Lane, S. N.; Buckley, C.

    2007-12-01

    Pollution of rivers from agricultural phosphorus is recognised as a significant global problem and is a major management challenge as it involves processes that are small in magnitude, distributed over large areas, operating at fine spatial scales and associated with certain land use types when they are well connected to the receiving waters. Whilst some of these processes have been addressed in terms of water quality forecasting models and field measurements, we lack effective tools to prioritise where action should be taken to remediate the diffuse pollution problem. From a management perspective, the required information is on 'what to do where' rather than absolute values. This change in focus opens up the problem to be considered in a probabilistic / relative framework rather than concentrating on absolute values. The SCIMAP risk management framework is based on the critical source area concept whereby a risk and a connection are required to generate a problem. Treatments of both surface and subsurface hydrological connectivity have been developed. The approach is based on the philosophy that for a point to be considered connected there needs to be a continuous flow path to the receiving water. This information is calculated by simulating the possible flow paths from the source cell to the receiving water and recording the required catchment wetness to allow flow along that route. This algorithm gives information on the ease at which each point in the landscape can export risk along surface and subsurface pathways to the receiving waters. To understand the annual dynamics of the locational diffuse P risk, a temporal risk framework has been developed. This risk framework accounts for land management activies within the agricultural calendar. These events include the application of fertiliser, the P additions from livestock and the offtake of P in crops. Changes to these risks can be made to investigate management options. The SCIMAP risk mapping framework has

  5. An Integrated Web-based Decision Support System in Disaster Risk Management

    NASA Astrophysics Data System (ADS)

    Aye, Z. C.; Jaboyedoff, M.; Derron, M. H.

    2012-04-01

    Nowadays, web based decision support systems (DSS) play an essential role in disaster risk management because of their supporting abilities which help the decision makers to improve their performances and make better decisions without needing to solve complex problems while reducing human resources and time. Since the decision making process is one of the main factors which highly influence the damages and losses of society, it is extremely important to make right decisions at right time by combining available risk information with advanced web technology of Geographic Information System (GIS) and Decision Support System (DSS). This paper presents an integrated web-based decision support system (DSS) of how to use risk information in risk management efficiently and effectively while highlighting the importance of a decision support system in the field of risk reduction. Beyond the conventional systems, it provides the users to define their own strategies starting from risk identification to the risk reduction, which leads to an integrated approach in risk management. In addition, it also considers the complexity of changing environment from different perspectives and sectors with diverse stakeholders' involvement in the development process. The aim of this platform is to contribute a part towards the natural hazards and geosciences society by developing an open-source web platform where the users can analyze risk profiles and make decisions by performing cost benefit analysis, Environmental Impact Assessment (EIA) and Strategic Environmental Assessment (SEA) with the support of others tools and resources provided. There are different access rights to the system depending on the user profiles and their responsibilities. The system is still under development and the current version provides maps viewing, basic GIS functionality, assessment of important infrastructures (e.g. bridge, hospital, etc.) affected by landslides and visualization of the impact

  6. Continuous Risk Management: An Overview

    NASA Technical Reports Server (NTRS)

    Rosenberg, Linda; Hammer, Theodore F.

    1999-01-01

    Software risk management is important because it helps avoid disasters, rework, and overkill, but more importantly because it stimulates win-win situations. The objectives of software risk management are to identify, address, and eliminate software risk items before they become threats to success or major sources of rework. In general, good project managers are also good managers of risk. It makes good business sense for all software development projects to incorporate risk management as part of project management. The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to implement risk management. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This is an introductory tutorial to continuous risk management based on this course. The rational for continuous risk management and how it is incorporated into project management are discussed. The risk management structure of six functions is discussed in sufficient depth for managers to understand what is involved in risk management and how it is implemented. These functions include: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  7. Probability concepts in quality risk management.

    PubMed

    Claycamp, H Gregg

    2012-01-01

    Essentially any concept of risk is built on fundamental concepts of chance, likelihood, or probability. Although risk is generally a probability of loss of something of value, given that a risk-generating event will occur or has occurred, it is ironic that the quality risk management literature and guidelines on quality risk management tools are relatively silent on the meaning and uses of "probability." The probability concept is typically applied by risk managers as a combination of frequency-based calculation and a "degree of belief" meaning of probability. Probability as a concept that is crucial for understanding and managing risk is discussed through examples from the most general, scenario-defining and ranking tools that use probability implicitly to more specific probabilistic tools in risk management. A rich history of probability in risk management applied to other fields suggests that high-quality risk management decisions benefit from the implementation of more thoughtful probability concepts in both risk modeling and risk management. Essentially any concept of risk is built on fundamental concepts of chance, likelihood, or probability. Although "risk" generally describes a probability of loss of something of value, given that a risk-generating event will occur or has occurred, it is ironic that the quality risk management literature and guidelines on quality risk management methodologies and respective tools focus on managing severity but are relatively silent on the in-depth meaning and uses of "probability." Pharmaceutical manufacturers are expanding their use of quality risk management to identify and manage risks to the patient that might occur in phases of the pharmaceutical life cycle from drug development to manufacture, marketing to product discontinuation. A probability concept is typically applied by risk managers as a combination of data-based measures of probability and a subjective "degree of belief" meaning of probability. Probability as

  8. Gender, Race, and Risk: Intersectional Risk Management in the Sale of Sex Online.

    PubMed

    Moorman, Jessica D; Harrison, Kristen

    2016-09-01

    Sex worker experience of risk (e.g., physical violence or rape) is shaped by race, gender, and context. For web-based sex workers, experience of risk is comparatively minimal; what is unclear is how web-based sex workers manage risk and if online advertising plays a role in risk management. Building on intersectionality theory and research exploring risk management in sex work, we content-analyzed 600 escort advertisements from Backpage.com ( http://www.backpage.com ) to explore risk management in web-based sex work. To guide our research we asked: Do advertisements contain risk management messages? Does the use of risk management messaging differ by sex worker race or gender? Which groups have the highest overall use of risk management messages? Through a multivariate analysis of covariance (MANCOVA) we found that advertisements contained risk management messages and that uses of these phrases varied by race and gender. Blacks, women, and transgender women drove the use of risk management messages. Black and White transgender women had the highest overall use of these phrases. We conclude that risk management is an intersectional practice and that the use of risk management messages is a venue-specific manifestation of broader risk management priorities found in all venues where sex is sold.

  9. Risk Based Framework for Geotechnical Asset Management

    DOT National Transportation Integrated Search

    2017-12-28

    This report presents the outcome from a multi-year research study to incorporate a risk management framework for the Alaska Department of Transportation & Public Facilities Geotechnical Asset Management (GAM) Plan. The GAM Plan was developed by Paul ...

  10. An integrated risk assessment tool for team-based periodontal disease management.

    PubMed

    Thyvalikakath, Thankam P; Padman, Rema; Gupta, Sugandh

    2013-01-01

    Mounting evidence suggests a potential association of periodontal disease with systemic diseases such as diabetes, cardiovascular disease, cancer and stroke. The objective of this study is to develop an integrated risk assessment tool that displays a patients' risk for periodontal disease in the context of their systemic disease, social habits and oral health. Such a tool will be used by not just dental professionals but also by care providers who participate in the team-based care for chronic disease management. Displaying relationships between risk factors and its influence on the patient's general health could be a powerful educational and disease management tool for patients and clinicians. It may also improve the coordination of care provided by the provider-members of a chronic care team.

  11. RISK MANAGEMENT USING PROJECT RECON

    DTIC Science & Technology

    2016-11-28

    Risk Management Using Project Recon UNCLASSIFIED: Distribution Statement A. Approved for public release; distribution is unlimited. Bonnie Leece... Project Recon Lead What is Project Recon? • A web-based GOTS tool designed to capture, manage, and link Risks, Issues, and Opportunities in a...centralized database. • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any

  12. [Risk management for medical devices].

    PubMed

    Xie, Ying-jie; Xu, Xing-gang

    2007-07-01

    Based on the practices of the risk management activities by Chinese medical device manufacturers and theoretical study of the latest international standard ISO 14971:2007, this article analyses the risk management in medical device manufacturing industry by introducing the status quo of applications, four requirements at operational stages, and future trends of development. Methods and suggestions are therefore given to medical device manufacturers for risk management.

  13. Chronic kidney disease risk reduction in a Hispanic population through pharmacist-based disease-state management.

    PubMed

    Leal, Sandra; Soto, Marisa

    2008-04-01

    The purpose of this study was to evaluate the ability of a pharmacist-based disease-state management service to improve the care of indigent, predominately Spanish-speaking patients with diabetes mellitus and common comorbid conditions at high risk for the development of chronic kidney disease (CKD). Patients at high risk for developing CKD who have diabetes at a community health center were placed in a pharmacist-based disease state management service for CKD risk reduction. A residency-trained, bilingual, certified diabetes educator, with a PharmD served as the patient's provider using diagnostic, educational, and therapeutic management services under a medical staff approved collaborative practice agreement. Outcomes were assessed by using national standards of care for disease control and prevention screening. The impact on CKD was shown with a mean A1C decrease of 2% and improvement in the proportion of patients at target goals for blood pressure, A1C, and cholesterol levels and receiving aspirin and angiotensin-converting enzyme inhibitor/angiotensin receptor blocker. A pharmacist-based disease-state management service for CKD risk reduction, care of diabetes, and frequently associated comorbid conditions improved compliance with national standards for diabetes care in a high-risk population.

  14. Risk Management.

    ERIC Educational Resources Information Center

    Randal, L. Nathan

    This chapter of "Principles of School Business Management" presents an overview of risk management for school districts. The chapter first discusses four fundamental elements of risk management: (1) identifying and measuring risks; (2) reducing or eliminating risks; (3) transferring unassumable risks; and (4) assuming remaining risks.…

  15. Risk management.

    PubMed

    Chambers, David W

    2010-01-01

    Every plan contains risk. To proceed without planning some means of managing that risk is to court failure. The basic logic of risk is explained. It consists in identifying a threshold where some corrective action is necessary, the probability of exceeding that threshold, and the attendant cost should the undesired outcome occur. This is the probable cost of failure. Various risk categories in dentistry are identified, including lack of liquidity; poor quality; equipment or procedure failures; employee slips; competitive environments; new regulations; unreliable suppliers, partners, and patients; and threats to one's reputation. It is prudent to make investments in risk management to the extent that the cost of managing the risk is less than the probable loss due to risk failure and when risk management strategies can be matched to type of risk. Four risk management strategies are discussed: insurance, reducing the probability of failure, reducing the costs of failure, and learning. A risk management accounting of the financial meltdown of October 2008 is provided.

  16. Nature-based flood risk management -challenges in implementing catchment-wide management concepts

    NASA Astrophysics Data System (ADS)

    Thaler, Thomas; Fuchs, Sven

    2017-04-01

    Traditionally, flood risk management focused on coping with the flow at a given point by, for example, building dikes or straightening the watercourse. Increasingly the emphasis has shifted to measures within the flood plain to delay the flow through storage. As such the fluent boundaries imposed by the behaviour of the catchment at a certain point are relocated upstream by the human intervention. Therefore, the implementation of flood storages and the use of natural retention areas are promoted as mitigation measures to support sustainable flood risk management. They aimed at reducing the effluent boundaries on the floodplain by increasing the effluent boundaries upstream. However, beyond the simple change of practices it is indeed often a question of land use change which is at stake in water management. As such, it poses the questions on how to govern both water and land to satisfy the different stakeholders. Nature-based strategies often follow with voluntary agreements, which are promoted as an alternative instrument to the traditional top-down command and control regulation. Voluntary agreements aim at bringing more efficiency, participatory and transparency in solving problems between different social groups. In natural hazard risk management voluntary agreements are now receiving high interests to complement the existing policy instruments in order to achieve the objectives the EU WFD and of the Floods Directive. This paper investigates the use of voluntary agreements as an alternative instrument to the traditional top-down command and control regulation in the implementation of flood storages in Austria. The paper provides a framework of analysis to reveal barriers and opportunities associated with such approach. The paper concludes that institution and power are the central elements to tackle for allowing the success of voluntary agreement.

  17. Risk Management

    DTIC Science & Technology

    2011-06-02

    actively attack the risks, they will actively attack you.” -Tom Gib Why do Risk Management? 8 “The first step in the risk management process is to...opportunities to manage and improve our chances of success. - Roger Vanscoy “If you do not actively attack the risks, they will actively attack ...our risks provides opportunities to manage and improve our chances of success. - Roger Vanscoy “If you do not actively attack the risks, they will

  18. Problem-Based Teaching in International Management: A Political/Economic Risk Assessment Exercise

    ERIC Educational Resources Information Center

    Daly, Paula S.; White, Marion M.; Zisk, Daniel S.; Cavazos, David E.

    2013-01-01

    This article draws from the current literature to examine problem-based learning (PBL) as a management education tool, and provides an example of how to incorporate PBL into an undergraduate international management course. Also included are an explanation of, and specific guidelines for, a PBL exercise focused on the analysis of "country risk"…

  19. Application of a generic bow-tie based risk analysis framework on risk management of sea ports and offshore terminals.

    PubMed

    Mokhtari, Kambiz; Ren, Jun; Roberts, Charles; Wang, Jin

    2011-08-30

    Ports and offshore terminals are critical infrastructure resources and play key roles in the transportation of goods and people. With more than 80 percent of international trade by volume being carried out by sea, ports and offshore terminals are vital for seaborne trade and international commerce. Furthermore in today's uncertain and complex environment there is a need to analyse the participated risk factors in order to prioritise protective measures in these critically logistics infrastructures. As a result of this study is carried out to support the risk assessment phase of the proposed Risk Management (RM) framework used for the purpose of sea ports and offshore terminals operations and management (PTOM). This has been fulfilled by integration of a generic bow-tie based risk analysis framework into the risk assessment phase as a backbone of the phase. For this reason Fault Tree Analysis (FTA) and Event Tree Analysis (ETA) are used to analyse the risk factors associated within the PTOM. This process will eventually help the port professionals and port risk managers to investigate the identified risk factors more in detail. In order to deal with vagueness of the data Fuzzy Set Theory (FST) and possibility approach are used to overcome the disadvantages of the conventional probability based approaches. Copyright © 2011 Elsevier B.V. All rights reserved.

  20. A Framework for Integrating Knowledge Management with Risk Management for Information Technology Projects (RiskManiT)

    ERIC Educational Resources Information Center

    Karadsheh, Louay A.

    2010-01-01

    This research focused on the challenges experienced when executing risk management activities for information technology projects. The lack of adequate knowledge management support of risk management activities has caused many project failures in the past. The research objective was to propose a conceptual framework of the Knowledge-Based Risk…

  1. Risk Assessment and Hierarchical Risk Management of Enterprises in Chemical Industrial Parks Based on Catastrophe Theory

    PubMed Central

    Chen, Yu; Song, Guobao; Yang, Fenglin; Zhang, Shushen; Zhang, Yun; Liu, Zhenyu

    2012-01-01

    According to risk systems theory and the characteristics of the chemical industry, an index system was established for risk assessment of enterprises in chemical industrial parks (CIPs) based on the inherent risk of the source, effectiveness of the prevention and control mechanism, and vulnerability of the receptor. A comprehensive risk assessment method based on catastrophe theory was then proposed and used to analyze the risk levels of ten major chemical enterprises in the Songmu Island CIP, China. According to the principle of equal distribution function, the chemical enterprise risk level was divided into the following five levels: 1.0 (very safe), 0.8 (safe), 0.6 (generally recognized as safe, GRAS), 0.4 (unsafe), 0.2 (very unsafe). The results revealed five enterprises (50%) with an unsafe risk level, and another five enterprises (50%) at the generally recognized as safe risk level. This method solves the multi-objective evaluation and decision-making problem. Additionally, this method involves simple calculations and provides an effective technique for risk assessment and hierarchical risk management of enterprises in CIPs. PMID:23208298

  2. A red-flag-based approach to risk management of EHR-related safety concerns.

    PubMed

    Sittig, Dean F; Singh, Hardeep

    2013-01-01

    Although electronic health records (EHRs) have a significant potential to improve patient safety, EHR-related safety concerns have begun to emerge. Based on 369 responses to a survey sent to the memberships of the American Society for Healthcare Risk Management and the American Health Lawyers Association and supplemented by our previous work in EHR-related patient safety, we identified the following common EHR-related safety concerns: (1) incorrect patient identification; (2) extended EHR unavailability (either planned or unplanned); (3) failure to heed a computer-generated warning or alert; (4) system-to-system interface errors; (5) failure to identify, find, or use the most recent patient data; (6) misunderstandings about time; (7) incorrect item selected from a list of items; and (8) open or incomplete orders. In this article, we present a "red-flag"-based approach that can be used by risk managers to identify potential EHR safety concerns in their institutions. An organization that routinely conducts EHR-related surveillance activities, such as the ones proposed here, can significantly reduce risks associated with EHR implementation and use. © 2013 American Society for Healthcare Risk Management of the American Hospital Association.

  3. Promoting evidence-based practice: managing change in the assessment of pressure damage risk.

    PubMed

    Gerrish, K; Clayton, J; Nolan, M; Parker, K; Morgan, L

    1999-11-01

    This study set out to facilitate the development of evidence-based practice in the assessment of pressure damage risk to patients within a large acute hospital. The importance of nursing practice being based on the best available evidence is emphasized in recent health policy. Meeting this objective is not easy as both individual and organizational factors create barriers to the implementation of research findings and the achievement of change. The study was based on an action research model. It comprised three stages: a review of the research evidence; a survey of qualified nurses' knowledge of risk assessment of pressure damage and an audit of record keeping, and a multifaceted approach to achieving change in which researchers, managers, practitioners and clinical nurse specialists worked together collaboratively. The findings from the survey and audit indicated a shortfall in nurses' knowledge of risk assessment of pressure damage and in their record keeping. The researchers, with the help of the clinical nurse specialist, built upon these findings by assisting practitioners and managers to take ownership of the need to base practice on the appropriate evidence. Achieving evidence-based practice is a complex undertaking that requires the development of an evaluative culture and a commitment by practitioners and managers to change practice. Researchers can play a valuable role in facilitating this process.

  4. Leaching characteristics, ecotoxicity, and risk assessment based management of mine wastes

    NASA Astrophysics Data System (ADS)

    Kim, J.; Ju, W. J.; Jho, E. H.; Nam, K.; Hong, J. K.

    2016-12-01

    Mine wastes generated during mining activities in metal mines generally contain high concentrations of metals that may impose toxic effects to surrounding environment. Thus, it is necessary to properly assess the mining-impacted landscapes for management. The study investigated leaching characteristics, potential environmental effects, and human health risk of mine wastes from three different metal mines in South Korea (molybdenum mine, lead-zinc mine, and magnetite mine). The heavy metal concentrations in the leachates obtained by using the Korean Standard Test Method for Solid Wastes (STM), Toxicity Characteristics Leaching Procedure (TCLP), and Synthetic Precipitation Leaching Procedure (SPLP) met the Korea Waste Control Act and the USEPA region 3 regulatory levels accordingly, even though the mine wastes contained high concentrations of metals. Assuming that the leachates may get into nearby water sources, the leachate toxicity was tested using Daphnia Magna. The toxic unit (TU) values after 24 h and 48 h exposure of all the mine wastes tested met the Korea Allowable Effluent Water Quality Standards (TU<1). The column leaching test showed that the lead-zinc mine waste may have long-term toxic effects (TU>1 for the eluent at L/S of 30) implying that the long-term effect of mine wastes left in mining areas need to be assessed. Considering reuse of mine wastes as a way of managing mine wastes, the human health risk assessment of reusing the lead-zinc mine waste in industrial areas was carried out using the bioavailable fraction of the heavy metals contained in the mine wastes, which was determined by using the Solubility/Bioavailability Research Consortium method. There may be potential carcinogenic risk (9.7E-05) and non-carcinogenic risk (HI, Hazard Index of 1.0E+00) as CR≧1.0E-05 has carcinogenic risk and HI≧1.0E+00 has non-carcinogenic risk. Overall, this study shows that not only the concentration-based assessment but ecological toxic effect and human

  5. Project Risk Management

    NASA Technical Reports Server (NTRS)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  6. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    NASA Astrophysics Data System (ADS)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  7. Calysto: Risk Management for Commercial Manned Spaceflight

    NASA Technical Reports Server (NTRS)

    Dillaman, Gary

    2012-01-01

    The Calysto: Risk Management for Commercial Manned Spaceflight study analyzes risk management in large enterprises and how to effectively communicate risks across organizations. The Calysto Risk Management tool developed by NASA's Kennedy Space Center's SharePoint team is used and referenced throughout the study. Calysto is a web-base tool built on Microsoft's SharePoint platform. The risk management process at NASA is examined and incorporated in the study. Using risk management standards from industry and specific organizations at the Kennedy Space Center, three methods of communicating and elevating risk are examined. Each method describes details of the effectiveness and plausibility of using the method in the Calysto Risk Management Tool. At the end of the study suggestions are made for future renditions of Calysto.

  8. Risk perception as a driver for risk management policies

    NASA Astrophysics Data System (ADS)

    Carmona, María; Mañez, María

    2016-04-01

    Risk is generally defined as the "combination of the probability of the occurrence of an event and its negative consequences" ( UNISDR, 2009). However, the perception of a risk differs among cultures regarding different features such as the context,causes, benefits or damage. Risk perception is the subjective valuation of the probability of an event happening and how concerned individuals or groups are with the consequences (Sjöberg, 2004). Our study is based on an existing framework for risk perception (Rehn and Rohrmann, 2000). We analyse the characteristics of the risk perception regarding extreme events (e.g.droughts) and how the perception of the group drives the action to manage the risk. We do this to achieve an overview of the conditions that let stakeholders join each other to improve risk management especially when governments are not reacting properly. For our research, attention is paid on risk perception of Multi-Sector Partnerships not taking into account the individual level of risk perception. We focus on those factors that make risk management effective and increase resilience. Multi-Sector Partnerships, considered as significant governance structures for risk management, might contribute to reduce vulnerability in prone areas to natural hazards and disasters. The Multi-Sector Partnerships used for our research are existing partnerships identified in the cases studies of the European project ENHANCE. We implement a survey to analyse the perception of risk in the case studies. That survey is based on the Cultural Theory (Douglas and Wildavsky, 1982)and the Protection Motivation Theory (Rogers, 1975). We analyse the results using the Qualitative-Comparative Analysis proposed by Ragin in 1987. The results show the main characteristics of a risk culture that are beneficial to manage a risk. Those characteristics are shaped by the perception of risk of the people involved in the partnership, which in turn shapes their risk management. Nevertheless, we

  9. Introduction to Decision Support Systems for Risk Based Management of Contaminated Sites

    EPA Science Inventory

    A book on Decision Support Systems for Risk-based Management of contaminated sites is appealing for two reasons. First, it addresses the problem of contaminated sites, which has worldwide importance. Second, it presents Decision Support Systems (DSSs), which are powerful comput...

  10. An evaluation of a risk-based environmental regulation in Brazil: Limitations to risk management of hazardous installations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Naime, Andre, E-mail: andre.naime.ibama@gmail.com

    The environmental regulation of hazardous projects with risk-based decision-making processes can lead to a deficient management of human exposure to technological hazards. Such an approach for regulation is criticized for simplifying the complexity of decisions involving the economic, social, and environmental aspects of the installation and operation of hazardous facilities in urban areas. Results of a Brazilian case study indicate that oil and gas transmission pipelines may represent a threat to diverse communities if the relationship between such linear projects and human populations is overlooked by regulatory bodies. Results also corroborate known challenges to the implementation of EIA processes andmore » outline limitations to an effective environmental and risk management. Two preliminary topics are discussed to strengthen similar regulatory practices. Firstly, an effective integration between social impact assessment and risk assessment in EIA processes to have a more comprehensive understanding of the social fabric. Secondly, the advancement of traditional management practices for hazardous installations to pursue a strong transition from assessment and evaluation to management and control and to promote an effective interaction between land-use planning and environmental regulation.« less

  11. Adoption of Building Information Modelling in project planning risk management

    NASA Astrophysics Data System (ADS)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  12. Incorporating probabilistic seasonal climate forecasts into river management using a risk-based framework

    USGS Publications Warehouse

    Sojda, Richard S.; Towler, Erin; Roberts, Mike; Rajagopalan, Balaji

    2013-01-01

    [1] Despite the influence of hydroclimate on river ecosystems, most efforts to date have focused on using climate information to predict streamflow for water supply. However, as water demands intensify and river systems are increasingly stressed, research is needed to explicitly integrate climate into streamflow forecasts that are relevant to river ecosystem management. To this end, we present a five step risk-based framework: (1) define risk tolerance, (2) develop a streamflow forecast model, (3) generate climate forecast ensembles, (4) estimate streamflow ensembles and associated risk, and (5) manage for climate risk. The framework is successfully demonstrated for an unregulated watershed in southwest Montana, where the combination of recent drought and water withdrawals has made it challenging to maintain flows needed for healthy fisheries. We put forth a generalized linear modeling (GLM) approach to develop a suite of tools that skillfully model decision-relevant low flow characteristics in terms of climate predictors. Probabilistic precipitation forecasts are used in conjunction with the GLMs, resulting in season-ahead prediction ensembles that provide the full risk profile. These tools are embedded in an end-to-end risk management framework that directly supports proactive fish conservation efforts. Results show that the use of forecasts can be beneficial to planning, especially in wet years, but historical precipitation forecasts are quite conservative (i.e., not very “sharp”). Synthetic forecasts show that a modest “sharpening” can strongly impact risk and improve skill. We emphasize that use in management depends on defining relevant environmental flows and risk tolerance, requiring local stakeholder involvement.

  13. Rational risk-based decision support for drinking water well managers by optimized monitoring designs

    NASA Astrophysics Data System (ADS)

    Enzenhöfer, R.; Geiges, A.; Nowak, W.

    2011-12-01

    Advection-based well-head protection zones are commonly used to manage the contamination risk of drinking water wells. Considering the insufficient knowledge about hazards and transport properties within the catchment, current Water Safety Plans recommend that catchment managers and stakeholders know, control and monitor all possible hazards within the catchments and perform rational risk-based decisions. Our goal is to supply catchment managers with the required probabilistic risk information, and to generate tools that allow for optimal and rational allocation of resources between improved monitoring versus extended safety margins and risk mitigation measures. To support risk managers with the indispensable information, we address the epistemic uncertainty of advective-dispersive solute transport and well vulnerability (Enzenhoefer et al., 2011) within a stochastic simulation framework. Our framework can separate between uncertainty of contaminant location and actual dilution of peak concentrations by resolving heterogeneity with high-resolution Monte-Carlo simulation. To keep computational costs low, we solve the reverse temporal moment transport equation. Only in post-processing, we recover the time-dependent solute breakthrough curves and the deduced well vulnerability criteria from temporal moments by non-linear optimization. Our first step towards optimal risk management is optimal positioning of sampling locations and optimal choice of data types to reduce best the epistemic prediction uncertainty for well-head delineation, using the cross-bred Likelihood Uncertainty Estimator (CLUE, Leube et al., 2011) for optimal sampling design. Better monitoring leads to more reliable and realistic protection zones and thus helps catchment managers to better justify smaller, yet conservative safety margins. In order to allow an optimal choice in sampling strategies, we compare the trade-off in monitoring versus the delineation costs by accounting for ill

  14. Managing health and safety risks: Implications for tailoring health and safety management system practices.

    PubMed

    Willmer, D R; Haas, E J

    2016-01-01

    As national and international health and safety management system (HSMS) standards are voluntarily accepted or regulated into practice, organizations are making an effort to modify and integrate strategic elements of a connected management system into their daily risk management practices. In high-risk industries such as mining, that effort takes on added importance. The mining industry has long recognized the importance of a more integrated approach to recognizing and responding to site-specific risks, encouraging the adoption of a risk-based management framework. Recently, the U.S. National Mining Association led the development of an industry-specific HSMS built on the strategic frameworks of ANSI: Z10, OHSAS 18001, The American Chemistry Council's Responsible Care, and ILO-OSH 2001. All of these standards provide strategic guidance and focus on how to incorporate a plan-do-check-act cycle into the identification, management and evaluation of worksite risks. This paper details an exploratory study into whether practices associated with executing a risk-based management framework are visible through the actions of an organization's site-level management of health and safety risks. The results of this study show ways that site-level leaders manage day-to-day risk at their operations that can be characterized according to practices associated with a risk-based management framework. Having tangible operational examples of day-to-day risk management can serve as a starting point for evaluating field-level risk assessment efforts and their alignment to overall company efforts at effective risk mitigation through a HSMS or other processes.

  15. MO-E-9A-01: Risk Based Quality Management: TG100 In Action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huq, M; Palta, J; Dunscombe, P

    2014-06-15

    One of the goals of quality management in radiation therapy is to gain high confidence that patients will receive the prescribed treatment correctly. To accomplish these goals professional societies such as the American Association of Physicists in Medicine (AAPM) has published many quality assurance (QA), quality control (QC), and quality management (QM) guidance documents. In general, the recommendations provided in these documents have emphasized on performing device-specific QA at the expense of process flow and protection of the patient against catastrophic errors. Analyses of radiation therapy incidents find that they are most often caused by flaws in the overall therapymore » process, from initial consult through final treatment, than by isolated hardware or computer failures detectable by traditional physics QA. This challenge is shared by many intrinsically hazardous industries. Risk assessment tools and analysis techniques have been developed to define, identify, and eliminate known and/or potential failures, problems, or errors, from a system, process and/or service before they reach the customer. These include, but are not limited to, process mapping, failure modes and effects analysis (FMEA), fault tree analysis (FTA), and establishment of a quality management program that best avoids the faults and risks that have been identified in the overall process. These tools can be easily adapted to radiation therapy practices because of their simplicity and effectiveness to provide efficient ways to enhance the safety and quality of treatment processes. Task group 100 (TG100) of AAPM has developed a risk-based quality management program that uses these tools. This session will be devoted to a discussion of these tools and how these tools can be used in a given radiotherapy clinic to develop a risk based QM program. Learning Objectives: Learn how to design a process map for a radiotherapy process. Learn how to perform a FMEA analysis for a given process

  16. NASA's Risk Management System

    NASA Technical Reports Server (NTRS)

    Perera, Jeevan S.

    2011-01-01

    Leadership is key to success. Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks -- risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  17. NASA's Risk Management System

    NASA Technical Reports Server (NTRS)

    Perera, Jeevan S.

    2013-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks - not just risk office personnel. Each group/department is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk informed decision making should be introduced to all levels of management. ? Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  18. Risk management frameworks for human health and environmental risks.

    PubMed

    Jardine, Cindy; Hrudey, Steve; Shortreed, John; Craig, Lorraine; Krewski, Daniel; Furgal, Chris; McColl, Stephen

    2003-01-01

    -Making Framework for Identifying, Assessing and Managing Health Risks (Health Canada, 2000). 4. Canadian Environmental Protection Act: Human Health Risk Assessment of Priority Substances(Health Canada, 1994). 5. CSA-Q8550 Risk Management: Guidelines for Decision-Makers (Canada Standards Association, 1997). 6. Risk Assessment in the Federal Government: Managing the Process (US National Research Council, 1983). 7. Understanding Risk: Informing Decisions in a Democratic Society (US National Research Council, 1996). 8. Environmental Health Risk Assessment (enHealth Council of Australia, 2002). 9. A Framework for Ecological Risk Assessment (CCME, 1996). 10. Ecological Risk Assessments of Priority Substances Under the Canadian Environmental Protection Act (Environment Canada, 1996).11. Guidelines for Ecological Risk Assessment (US EPA, 1998b). 12. Proposed Model for Occupational Health Risk Assessment and Management (Rampal & Sadhra, 1999). Based on the extensive review of these frameworks, seven key elements that should be included in a comprehensive framework for human health, ecological, and occupational risk assessment and management were identified: 1. Problem formulation stage. 2. Stakeholder involvement. 3. Communication. 4. Quantitative risk assessment components. 5. Iteration and evaluation. 6. Informed decision making. 7. Flexibility. On the basis of this overarching approach to risk management, the following "checklist" to ensure a good risk management decision is proposed: - Make sure you're solving the right problem. - Consider the problem and the risk within the full context of the situation, using a broad perspective. - Acknowledge, incorporate, and balance the multiple dimensions of risk. - Ensure the highest degree of reliability for all components of the risk management process. - Involve interested and effected parties from the outset of the process. - Commit to honest and open communication between all parties. - Employ continuous evaluation throughout the process

  19. Cognitive mapping tools: review and risk management needs.

    PubMed

    Wood, Matthew D; Bostrom, Ann; Bridges, Todd; Linkov, Igor

    2012-08-01

    Risk managers are increasingly interested in incorporating stakeholder beliefs and other human factors into the planning process. Effective risk assessment and management requires understanding perceptions and beliefs of involved stakeholders, and how these beliefs give rise to actions that influence risk management decisions. Formal analyses of risk manager and stakeholder cognitions represent an important first step. Techniques for diagramming stakeholder mental models provide one tool for risk managers to better understand stakeholder beliefs and perceptions concerning risk, and to leverage this new understanding in developing risk management strategies. This article reviews three methodologies for assessing and diagramming stakeholder mental models--decision-analysis-based mental modeling, concept mapping, and semantic web analysis--and assesses them with regard to their ability to address risk manager needs. © 2012 Society for Risk Analysis.

  20. A risk-based approach to sanitary sewer pipe asset management.

    PubMed

    Baah, Kelly; Dubey, Brajesh; Harvey, Richard; McBean, Edward

    2015-02-01

    Wastewater collection systems are an important component of proper management of wastewater to prevent environmental and human health implications from mismanagement of anthropogenic waste. Due to aging and inadequate asset management practices, the wastewater collection assets of many cities around the globe are in a state of rapid decline and in need of urgent attention. Risk management is a tool which can help prioritize resources to better manage and rehabilitate wastewater collection systems. In this study, a risk matrix and a weighted sum multi-criteria decision-matrix are used to assess the consequence and risk of sewer pipe failure for a mid-sized city, using ArcGIS. The methodology shows that six percent of the uninspected sewer pipe assets of the case study have a high consequence of failure while four percent of the assets have a high risk of failure and hence provide priorities for inspection. A map incorporating risk of sewer pipe failure and consequence is developed to facilitate future planning, rehabilitation and maintenance programs. The consequence of failure assessment also includes a novel failure impact factor which captures the effect of structurally defective stormwater pipes on the failure assessment. The methodology recommended in this study can serve as a basis for future planning and decision making and has the potential to be universally applied by municipal sewer pipe asset managers globally to effectively manage the sanitary sewer pipe infrastructure within their jurisdiction. Copyright © 2014 Elsevier B.V. All rights reserved.

  1. [Global risk management].

    PubMed

    Sghaier, W; Hergon, E; Desroches, A

    2015-08-01

    Risk management is a fundamental component of any successful company, whether it is in economic, societal or environmental aspect. Risk management is an especially important activity for companies that optimal security challenge of products and services is great. This is the case especially for the health sector institutions. Risk management is therefore a decision support tool and a means to ensure the sustainability of an organization. In this context, what methods and approaches implemented to manage the risks? Through this state of the art, we are interested in the concept of risk and risk management processes. Then we focus on the different methods of risk management and the criteria for choosing among these methods. Finally we highlight the need to supplement these methods by a systemic and global approach including through risk assessment by the audits. Copyright © 2015 Elsevier Masson SAS. All rights reserved.

  2. Managing Research in a Risk World

    NASA Technical Reports Server (NTRS)

    Anton, W.; Havenhill, M.

    2014-01-01

    The Office of Chief Medical Officer (OCHMO) owns all human health and performance risks managed by the Human System Risk Board (HSRB). While the HSRB manages the risks, the Human Research Program (HRP) manages the research portion of the overall risk mitigation strategy for these risks. The HSRB manages risks according to a process that identifies and analyzes risks, plans risk mitigation and tracks and reviews the implementation of these strategies according to its decisions pertaining to the OCHMO risk posture. HRP manages risk research work using an architecture that describes evidence-based risks, gaps in our knowledge about characterizing or mitigating the risk, and the tasks needed to produce deliverables to fill the gaps and reduce the risk. A planning schedule reflecting expected research milestones is developed, and as deliverables and new evidence are generated, research progress is tracked via the Path to Risk Reduction (PRR) that reflects a risk's research plan for a design reference mission. HRP's risk research process closely interfaces with the HSRB risk management process. As research progresses, new deliverables and evidence are used by the HSRB in conjunction with other operational and non-research evidence to inform decisions pertaining to the likelihood and consequence of the risk and risk posture. Those decisions in turn guide forward work for research as it contributes to overall risk mitigation strategies. As HRP tracks its research work, it aligns its priorities by assessing the effectiveness of its contributions and maintaining specific core competencies that would be invaluable for future work for exploration missions.

  3. Managing Liability. Employment Discrimination: A Risk Management Strategy.

    ERIC Educational Resources Information Center

    McMullan, Sandra H.

    This booklet discusses the risks that educational institutions face in regard to employment discrimination litigation and outlines a program to effectively manage such risks. Institutions need to address three main types of employment discrimination issues: sexual harassment, disability-based discrimination, and age discrimination. To deal with…

  4. [What Surgeons Should Know about Risk Management].

    PubMed

    Strametz, R; Tannheimer, M; Rall, M

    2017-02-01

    Background: The fact that medical treatment is associated with errors has long been recognized. Based on the principle of "first do no harm", numerous efforts have since been made to prevent such errors or limit their impact. However, recent statistics show that these measures do not sufficiently prevent grave mistakes with serious consequences. Preventable mistakes such as wrong patient or wrong site surgery still frequently occur in error statistics. Methods: Based on insight from research on human error, in due consideration of recent legislative regulations in Germany, the authors give an overview of the clinical risk management tools needed to identify risks in surgery, analyse their causes, and determine adequate measures to manage those risks depending on their relevance. The use and limitations of critical incident reporting systems (CIRS), safety checklists and crisis resource management (CRM) are highlighted. Also the rationale for IT systems to support the risk management process is addressed. Results/Conclusion: No single tool of risk management can be effective as a standalone instrument, but unfolds its effect only when embedded in a superordinate risk management system, which integrates tailor-made elements to increase patient safety into the workflows of each organisation. Competence in choosing adequate tools, effective IT systems to support the risk management process as well as leadership and commitment to constructive handling of human error are crucial components to establish a safety culture in surgery. Georg Thieme Verlag KG Stuttgart · New York.

  5. Surveying perceptions of landslide risk management in Norway

    NASA Astrophysics Data System (ADS)

    Chiu, Jessica Ka Yi; Eidsvig, Unni

    2016-04-01

    Enhanced precipitation due to climate change leads to increase in both frequency and intensity of landslides in Norway. A proactive approach to risk management is therefore required to significantly reduce the losses associated with landslides. Opinions and perceptions from practitioners on the performance of landslide risk management can provide insights on areas for improvement in the landslide risk management strategies in Norway. The Risk Management Index (RMI), proposed by Cardona et al. (2004), is a well-established method to measure perceptions of disaster management of selected actors holistically. The RMI is measured based on opinion questionnaires to technical staff, decision-makers, and stakeholders involved in all stages of risk reduction strategies. It is a composite index that considers a wide variety of strategies to manage risks, including structural and non-structural measures, acceptance strategies, disaster management, and risk transfer. The RMI method was modified to be implemented in landslide hazards and to fit with Norwegian conditions. An opinion survey was conducted in autumn 2015 to measure perceptions of landslide risk management in Norway. Perceptions were surveyed for two time periods: 2015 and 2050, and are based on national, county, and municipality levels. Based on the survey results, performance of landslide risk management at any administrative levels in Norway is perceived to improve from `significant' in 2015 to `significant' to `outstanding' in 2050. Knowledge and technology, climate, risk perceptions, and anthropogenic activities are mostly considered by respondents for their 2050 perceptions. Several aspects of landslide risk management in Norway can be improved. For example, landslide hazard evaluation and mapping should be prioritised in Norway. Upgrading, retrofitting, and reconstruction of assets may also be included in the landslide risk reduction strategies. In addition, there should be more focus on inter

  6. Management of groundwater in farmed pond area using risk-based regulation.

    PubMed

    Huang, Jun-Ying; Liao, Chiao-Miao; Lin, Kao-Hung; Lee, Cheng-Haw

    2014-09-01

    Blackfoot disease (BFD) had occurred seriously in the Yichu, Hsuehchia, Putai, and Peimen townships of Chia-Nan District of Taiwan in the early days. These four townships are the districts of fishpond cultivation domestically in Taiwan. Groundwater becomes the main water supply because of short income in surface water. The problems of over pumping in groundwater may not only result in land subsidence and seawater intrusion but also be harmful to the health of human giving rise to the bioaccumulation via food chain in groundwater with arsenic (As). This research uses sequential indicator simulation (SIS) to characterize the spatial arsenic distribution in groundwater in the four townships. Risk assessment is applied to explore the dilution ratio (DR) of groundwater utilization, which is defined as the ratio showing the volume of groundwater utilization compared to pond water, for fish farming in the range of target cancer risk (TR) especially on the magnitude of 10(-4)~10(-6). Our study results reveal that the 50th percentile of groundwater DRs served as a regulation standard can be used to perform fish farm groundwater management for a TR of 10(-6). For a TR of 5 × 10(-6), we suggest using the 75th percentile of DR for groundwater management. For a TR of 10(-5), we suggest using the 95th percentile of the DR standard for performing groundwater management in fish farm areas. For the TR of exceeding 5 × 10(-5), we do not suggest establishing groundwater management standards under these risk standards. Based on the research results, we suggest that establishing a TR at 10(-5) and using the 95th percentile of DR are best for groundwater management in fish farm areas.

  7. A Framework for Drought Risk Management

    NASA Astrophysics Data System (ADS)

    Apurv, T.; Cai, X.

    2016-12-01

    Drought is one of the most expensive natural disasters as it affects many sectors of the economy. The threat posed by droughts is expected to further increase due to increasing water demands fuelled by increasing population and also due to climate change in many regions. Management of the increasing drought risk requires shift from traditional crisis management approaches to long term strategic planning for reduction of drought risk. This study proposes a framework for management of long term drought risk. The framework uses the system based approach proposed by Tsakiris et al. (2013), in which a watershed is considered as a system and different water sources in the watershed (like groundwater, reservoirs, streams etc.) are considered as subsystems associated with certain water requirements of different sectors. Droughts are defined separately for each subsystem considering water availability and requirement. The percentile based drought indicator framework proposed by Steinemann et al. (2015) is used for defining drought for each subsystem, allowing the selection of thresholds, variables of interest, and time scale which are most relevant for stakeholders dependent on a particular subsystem. Future drought risk under different drought management strategies are assessed using hydrologic models that model both hydrologic and human components of a watershed. The robustness of a management strategy is assessed by simulating system response across a wide range of stochastically generated future climate scenarios. The framework is useful for operational drought management as it allows direct management of drought risks with consideration of different water sources and water users. Steinemann, A., Iacobellis, S.F., Cayan, D.R., (2015) "Developing and evaluating drought indicators for decision-making" J. Hydrometeor. 16 (4), 1793-1803 Tsakiris, G, Nalbantis, I, Vangelis, H, Verbeiren, B, Huysmans, M, Tychon, B, Jacquemin, I, Canters, F, Vanderhaegen, S, Engelen, G

  8. Seizure risk with AVM treatment or conservative management: prospective, population-based study.

    PubMed

    Josephson, Colin B; Bhattacharya, Jo J; Counsell, Carl E; Papanastassiou, Vakis; Ritchie, Vaughn; Roberts, Richard; Sellar, Robin; Warlow, Charles P; Al-Shahi Salman, Rustam

    2012-08-07

    To compare the risk of epileptic seizures in adults during conservative management or following invasive treatment for a brain arteriovenous malformation (AVM). We used annual general practitioner follow-up, patient questionnaires, and medical records surveillance to quantify the 5-year risk of seizures and the chances of achieving 2-year seizure freedom for adults undergoing AVM treatment compared to adults managed conservatively in a prospective, population-based observational study of adults in Scotland, newly diagnosed with an AVM in 1999-2003. We identified 229 adults with a new diagnosis of an AVM, of whom two-thirds received AVM treatment (154/229; 67%) during 1,862 person-years of follow-up (median completeness of follow-up 97%). There was no significant difference in the proportions with a first or recurrent seizure over 5 years following AVM treatment, compared to the first 5 years following clinical presentation in conservatively managed adults, in analyses stratified by mode of presentation (intracerebral hemorrhage, 35% vs 26%, p = 0.5; seizure, 67% vs 72%, p = 0.6; incidental, 21% vs 10%, p = 0.4). For patients with epilepsy, the chances of achieving 2-year seizure freedom during 5-year follow-up were similar following AVM treatment (n = 39; 52%, 95% confidence interval [CI] 36% to 68%) or conservative management (n = 21; 57%, 95% CI 35% to 79%; p = 0.7). In this observational study, there was no difference in the 5-year risk of seizures with AVM treatment or conservative management, irrespective of whether the AVM had presented with hemorrhage or epileptic seizures.

  9. An agent based architecture for high-risk neonate management at neonatal intensive care unit.

    PubMed

    Malak, Jaleh Shoshtarian; Safdari, Reza; Zeraati, Hojjat; Nayeri, Fatemeh Sadat; Mohammadzadeh, Niloofar; Farajollah, Seide Sedighe Seied

    2018-01-01

    In recent years, the use of new tools and technologies has decreased the neonatal mortality rate. Despite the positive effect of using these technologies, the decisions are complex and uncertain in critical conditions when the neonate is preterm or has a low birth weight or malformations. There is a need to automate the high-risk neonate management process by creating real-time and more precise decision support tools. To create a collaborative and real-time environment to manage neonates with critical conditions at the NICU (Neonatal Intensive Care Unit) and to overcome high-risk neonate management weaknesses by applying a multi agent based analysis and design methodology as a new solution for NICU management. This study was a basic research for medical informatics method development that was carried out in 2017. The requirement analysis was done by reviewing articles on NICU Decision Support Systems. PubMed, Science Direct, and IEEE databases were searched. Only English articles published after 1990 were included; also, a needs assessment was done by reviewing the extracted features and current processes at the NICU environment where the research was conducted. We analyzed the requirements and identified the main system roles (agents) and interactions by a comparative study of existing NICU decision support systems. The Universal Multi Agent Platform (UMAP) was applied to implement a prototype of our multi agent based high-risk neonate management architecture. Local environment agents interacted inside a container and each container interacted with external resources, including other NICU systems and consultation centers. In the NICU container, the main identified agents were reception, monitoring, NICU registry, and outcome prediction, which interacted with human agents including nurses and physicians. Managing patients at the NICU units requires online data collection, real-time collaboration, and management of many components. Multi agent systems are applied as

  10. FlySec: a risk-based airport security management system based on security as a service concept

    NASA Astrophysics Data System (ADS)

    Kyriazanos, Dimitris M.; Segou, Olga E.; Zalonis, Andreas; Thomopoulos, Stelios C. A.

    2016-05-01

    Complementing the ACI/IATA efforts, the FLYSEC European H2020 Research and Innovation project (http://www.fly-sec.eu/) aims to develop and demonstrate an innovative, integrated and end-to-end airport security process for passengers, enabling a guided and streamlined procedure from the landside to airside and into the boarding gates, and offering for an operationally validated innovative concept for end-to-end aviation security. FLYSEC ambition turns through a well-structured work plan into: (i) innovative processes facilitating risk-based screening; (ii) deployment and integration of new technologies and repurposing existing solutions towards a risk-based Security paradigm shift; (iii) improvement of passenger facilitation and customer service, bringing security as a real service in the airport of tomorrow;(iv) achievement of measurable throughput improvement and a whole new level of Quality of Service; and (v) validation of the results through advanced "in-vitro" simulation and "in-vivo" pilots. On the technical side, FLYSEC achieves its ambitious goals by integrating new technologies on video surveillance, intelligent remote image processing and biometrics combined with big data analysis, open-source intelligence and crowdsourcing. Repurposing existing technologies is also in the FLYSEC objectives, such as mobile application technologies for improved passenger experience and positive boarding applications (i.e. services to facilitate boarding and landside/airside way finding) as well as RFID for carry-on luggage tracking and quick unattended luggage handling. In this paper, the authors will describe the risk based airport security management system which powers FLYSEC intelligence and serves as the backend on top of which FLYSEC's front end technologies reside for security services management, behaviour and risk analysis.

  11. Risk Management Implementation Tool

    NASA Technical Reports Server (NTRS)

    Wright, Shayla L.

    2004-01-01

    Continuous Risk Management (CM) is a software engineering practice with processes, methods, and tools for managing risk in a project. It provides a controlled environment for practical decision making, in order to assess continually what could go wrong, determine which risk are important to deal with, implement strategies to deal with those risk and assure the measure effectiveness of the implemented strategies. Continuous Risk Management provides many training workshops and courses to teach the staff how to implement risk management to their various experiments and projects. The steps of the CRM process are identification, analysis, planning, tracking, and control. These steps and the various methods and tools that go along with them, identification, and dealing with risk is clear-cut. The office that I worked in was the Risk Management Office (RMO). The RMO at NASA works hard to uphold NASA s mission of exploration and advancement of scientific knowledge and technology by defining and reducing program risk. The RMO is one of the divisions that fall under the Safety and Assurance Directorate (SAAD). I worked under Cynthia Calhoun, Flight Software Systems Engineer. My task was to develop a help screen for the Continuous Risk Management Implementation Tool (RMIT). The Risk Management Implementation Tool will be used by many NASA managers to identify, analyze, track, control, and communicate risks in their programs and projects. The RMIT will provide a means for NASA to continuously assess risks. The goals and purposes for this tool is to provide a simple means to manage risks, be used by program and project managers throughout NASA for managing risk, and to take an aggressive approach to advertise and advocate the use of RMIT at each NASA center.

  12. Research on Risk Management and Power Supplying Enterprise Control

    NASA Astrophysics Data System (ADS)

    Shen, Jianfei; Wang, Yige

    2017-09-01

    This paper derived from the background that electric power enterprises strengthen their risk management under requirements of the government. For the power industry, we explained the risk management theory, analysed current macro environment as well as basic situation, then classified and interpreted the main risks. In a case study on a power bureau, we established a risk management system based on deep understanding about the characteristics of its organization system and risk management function. Then, we focused on risks in operation as well as incorrupt government construction to give a more effective framework of the risk management system. Finally, we came up with the problems and specific countermeasures in risk management, which provided a reference for other electric power enterprises.

  13. Managing the risks of disease transmission through trade: a commodities-based approach?

    PubMed

    Brückner, G K

    2011-04-01

    Since its founding in 1924, the World Organisation for Animal Health (OIE) has facilitated safe trade in animals and animal products by developing effective standards to prevent the spread of animal diseases across the globe. A protocol for recognising the disease-free status of countries is an integral part of this process and has been adopted and advanced through the years to assist OIE Member Countries in placing disease-free animals and their products on the international market. Options such as trade from disease-free zones and disease-free compartments are now available to Members and have proven to be a positive mechanism for facilitating trade. A further option is trading in safe commodities, i.e. animals and animal products that have been identified as safe to trade even in the presence of disease, either with or without applying risk mitigation measures before export. Although most Members have incorporated the acceptance of disease-free countries or zones into their animal health policies and sanitary measures, there still appears to be a reluctance to trade in commodities from infected countries, despite clear, scientifically based risk management standards that can be applied if needed. This paper offers some examples reflecting the apparent reluctance to trade in commodities and discusses how the standards in the OIE's Terrestrial Animal Health Code could be used to apply scientifically based risk management practices to review outdated policies.

  14. Selecting Statistical Procedures for Quality Control Planning Based on Risk Management.

    PubMed

    Yago, Martín; Alcover, Silvia

    2016-07-01

    According to the traditional approach to statistical QC planning, the performance of QC procedures is assessed in terms of its probability of rejecting an analytical run that contains critical size errors (PEDC). Recently, the maximum expected increase in the number of unacceptable patient results reported during the presence of an undetected out-of-control error condition [Max E(NUF)], has been proposed as an alternative QC performance measure because it is more related to the current introduction of risk management concepts for QC planning in the clinical laboratory. We used a statistical model to investigate the relationship between PEDC and Max E(NUF) for simple QC procedures widely used in clinical laboratories and to construct charts relating Max E(NUF) with the capability of the analytical process that allow for QC planning based on the risk of harm to a patient due to the report of erroneous results. A QC procedure shows nearly the same Max E(NUF) value when used for controlling analytical processes with the same capability, and there is a close relationship between PEDC and Max E(NUF) for simple QC procedures; therefore, the value of PEDC can be estimated from the value of Max E(NUF) and vice versa. QC procedures selected by their high PEDC value are also characterized by a low value for Max E(NUF). The PEDC value can be used for estimating the probability of patient harm, allowing for the selection of appropriate QC procedures in QC planning based on risk management. © 2016 American Association for Clinical Chemistry.

  15. Biosimilars: pharmacovigilance and risk management.

    PubMed

    Zuñiga, Leyre; Calvo, Begoña

    2010-07-01

    Biosimilars cannot be authorized based on the same requirements that apply to generic medicines. Despite the fact that the biosimilar and reference drug can show similar efficacy, the biosimilar may exhibit different safety profile in terms of nature, seriousness or incidence of adverse reactions. However, the data from pre-authorization clinical studies normally are insufficient to identify all potential differences. Therefore, clinical safety of similar biological medicinal products must be monitored closely on an ongoing basis during the post-approval phase including continued risk-benefit assessment. The biosimilar applicant must provide the European Medicines Agency (EMEA) with a risk management plan (EU-RMP) and pharmacovigilance programme with its application, including a description of the potential safety issues associated with the similar biological medicinal product that may be a result of differences in the manufacturing process from the reference biologic. The most critical safety concern relating to biopharmaceuticals (including biosimilars) is immunogenicity. Risk management applies scientifically based methodologies to identify, assess, communicate and minimise risk throughout a drug's life cycle so as to establish and maintain a favourable benefit-risk profile in patients. The risk management plan for biosimilars should focus on heightens the pharmacovigilance measures, identify immunogenicity risk and implement special post-marketing surveillance. Although International Nonproprietary Names (INNs) served as a useful tool in worldwide pharmacovigilance, for biologicals they should not be relied upon as the only means of product identification. Biologicals should always be commercialized with a brand name or the INN plus the manufacturer's name. (c) 2010 John Wiley & Sons, Ltd.

  16. Mental Health Professionals' Suicide Risk Assessment and Management Practices.

    PubMed

    Roush, Jared F; Brown, Sarah L; Jahn, Danielle R; Mitchell, Sean M; Taylor, Nathanael J; Quinnett, Paul; Ries, Richard

    2018-01-01

    Approximately 20% of suicide decedents have had contact with a mental health professional within 1 month prior to their death, and the majority of mental health professionals have treated suicidal individuals. Despite limited evidence-based training, mental health professionals make important clinical decisions related to suicide risk assessment and management. The current study aimed to determine the frequency of suicide risk assessment and management practices and the association between fear of suicide-related outcomes or comfort working with suicidal individuals and adequacy of suicide risk management decisions among mental health professionals. Mental health professionals completed self-report assessments of fear, comfort, and suicide risk assessment and management practices. Approximately one third of mental health professionals did not ask every patient about current or previous suicidal thoughts or behaviors. Further, comfort, but not fear, was positively associated with greater odds of conducting evidence-based suicide risk assessments at first appointments and adequacy of suicide risk management practices with patients reporting suicide ideation and a recent suicide attempt. The study utilized a cross-sectional design and self-report questionnaires. Although the majority of mental health professionals report using evidenced-based practices, there appears to be variability in utilization of evidence-based practices.

  17. Risk Management in EVA

    NASA Technical Reports Server (NTRS)

    Hall, Jonathan; Lutomski, M.

    2006-01-01

    This viewgraph presentation reviews the use of risk management in Extravehicular Activities (EVA). The contents include: 1) EVA Office at NASA - JSC; 2) EVA Project Risk Management: Why and When; 3) EVA Office Risk Management: How; 4) Criteria for Closing a Risk; 5) Criteria for Accepting a Risk; 6) ISS IRMA Reference Card Data Entry Requirement s; 7) XA/ EVA Office Risk Activity Summary; 8) EVA Significant Change Summary; 9) Integrated Risk Management Application (XA) Matrix, March 31, 2004; 10) ISS Watch Item: 50XX Summary Report; and 11) EVA Project RM Usefulness

  18. Risk preferences, probability weighting, and strategy tradeoffs in wildfire management

    Treesearch

    Michael S. Hand; Matthew J. Wibbenmeyer; Dave Calkin; Matthew P. Thompson

    2015-01-01

    Wildfires present a complex applied risk management environment, but relatively little attention has been paid to behavioral and cognitive responses to risk among public agency wildfire managers. This study investigates responses to risk, including probability weighting and risk aversion, in a wildfire management context using a survey-based experiment administered to...

  19. An optimization-based approach for facility energy management with uncertainties, and, Power portfolio optimization in deregulated electricity markets with risk management

    NASA Astrophysics Data System (ADS)

    Xu, Jun

    Topic 1. An Optimization-Based Approach for Facility Energy Management with Uncertainties. Effective energy management for facilities is becoming increasingly important in view of the rising energy costs, the government mandate on the reduction of energy consumption, and the human comfort requirements. This part of dissertation presents a daily energy management formulation and the corresponding solution methodology for HVAC systems. The problem is to minimize the energy and demand costs through the control of HVAC units while satisfying human comfort, system dynamics, load limit constraints, and other requirements. The problem is difficult in view of the fact that the system is nonlinear, time-varying, building-dependent, and uncertain; and that the direct control of a large number of HVAC components is difficult. In this work, HVAC setpoints are the control variables developed on top of a Direct Digital Control (DDC) system. A method that combines Lagrangian relaxation, neural networks, stochastic dynamic programming, and heuristics is developed to predict the system dynamics and uncontrollable load, and to optimize the setpoints. Numerical testing and prototype implementation results show that our method can effectively reduce total costs, manage uncertainties, and shed the load, is computationally efficient. Furthermore, it is significantly better than existing methods. Topic 2. Power Portfolio Optimization in Deregulated Electricity Markets with Risk Management. In a deregulated electric power system, multiple markets of different time scales exist with various power supply instruments. A load serving entity (LSE) has multiple choices from these instruments to meet its load obligations. In view of the large amount of power involved, the complex market structure, risks in such volatile markets, stringent constraints to be satisfied, and the long time horizon, a power portfolio optimization problem is of critical importance but difficulty for an LSE to serve the

  20. ePORT, NASA's Computer Database Program for System Safety Risk Management Oversight (Electronic Project Online Risk Tool)

    NASA Technical Reports Server (NTRS)

    Johnson, Paul W.

    2008-01-01

    ePORT (electronic Project Online Risk Tool) provides a systematic approach to using an electronic database program to manage a program/project risk management processes. This presentation will briefly cover the standard risk management procedures, then thoroughly cover NASA's Risk Management tool called ePORT. This electronic Project Online Risk Tool (ePORT) is a web-based risk management program that provides a common framework to capture and manage risks, independent of a programs/projects size and budget. It is used to thoroughly cover the risk management paradigm providing standardized evaluation criterion for common management reporting, ePORT improves Product Line, Center and Corporate Management insight, simplifies program/project manager reporting, and maintains an archive of data for historical reference.

  1. 17 CFR 23.609 - Clearing member risk management.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... management. 23.609 Section 23.609 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION... Clearing member risk management. (a) With respect to clearing activities in futures, security futures...) Monitor for adherence to the risk-based limits intra-day and overnight; (4) Conduct stress tests under...

  2. 17 CFR 23.609 - Clearing member risk management.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... management. 23.609 Section 23.609 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION... Clearing member risk management. (a) With respect to clearing activities in futures, security futures...) Monitor for adherence to the risk-based limits intra-day and overnight; (4) Conduct stress tests under...

  3. Cardiovascular risk management after reproductive and pregnancy-related disorders: A Dutch multidisciplinary evidence-based guideline.

    PubMed

    Heida, Karst Y; Bots, Michiel L; de Groot, Christianne Jm; van Dunné, Frederique M; Hammoud, Nurah M; Hoek, Annemiek; Laven, Joop Se; Maas, Angela Hem; Roeters van Lennep, Jeanine E; Velthuis, Birgitta K; Franx, Arie

    2016-11-01

    In the past decades evidence has accumulated that women with reproductive and pregnancy-related disorders are at increased risk of developing cardiovascular disease (CVD) in the future. Up to now there is no standardised follow-up of these women becausee guidelines on cardiovascular risk management for this group are lacking. However, early identification of high-risk populations followed by prevention and treatment of CVD risk factors has the potential to reduce CVD incidence. Therefore, the Dutch Society of Obstetrics and Gynaecology initiated a multidisciplinary working group to develop a guideline for cardiovascular risk management after reproductive and pregnancy-related disorders. The guideline addresses the cardiovascular risk consequences of gestational hypertension, preeclampsia, preterm delivery, small-for-gestational-age infant, recurrent miscarriage, polycystic ovary syndrome and premature ovarian insufficiency. The best available evidence on these topics was captured by systematic review. Recommendations for clinical practice were formulated based on the evidence and consensus of expert opinion. The Dutch societies of gynaecologists, cardiologists, vascular internists, radiologists and general practitioners reviewed the guideline to ensure support for implementation in clinical practice. For all reproductive and pregnancy-related disorders a moderate increased relative risk was found for overall CVD, except for preeclampsia (relative risk 2.15, 95% confidence interval 1.76-2.61). Based on the current available evidence, follow-up is only recommended for women with a history of preeclampsia. For all reproductive and pregnancy-related disorders optimisation of modifiable cardiovascular risk factors is recommended to reduce the risk of future CVD. © The European Society of Cardiology 2016.

  4. Evaluation of wholesale electric power market rules and financial risk management by agent-based simulations

    NASA Astrophysics Data System (ADS)

    Yu, Nanpeng

    As U.S. regional electricity markets continue to refine their market structures, designs and rules of operation in various ways, two critical issues are emerging. First, although much experience has been gained and costly and valuable lessons have been learned, there is still a lack of a systematic platform for evaluation of the impact of a new market design from both engineering and economic points of view. Second, the transition from a monopoly paradigm characterized by a guaranteed rate of return to a competitive market created various unfamiliar financial risks for various market participants, especially for the Investor Owned Utilities (IOUs) and Independent Power Producers (IPPs). This dissertation uses agent-based simulation methods to tackle the market rules evaluation and financial risk management problems. The California energy crisis in 2000-01 showed what could happen to an electricity market if it did not go through a comprehensive and rigorous testing before its implementation. Due to the complexity of the market structure, strategic interaction between the participants, and the underlying physics, it is difficult to fully evaluate the implications of potential changes to market rules. This dissertation presents a flexible and integrative method to assess market designs through agent-based simulations. Realistic simulation scenarios on a 225-bus system are constructed for evaluation of the proposed PJM-like market power mitigation rules of the California electricity market. Simulation results show that in the absence of market power mitigation, generation company (GenCo) agents facilitated by Q-learning are able to exploit the market flaws and make significantly higher profits relative to the competitive benchmark. The incorporation of PJM-like local market power mitigation rules is shown to be effective in suppressing the exercise of market power. The importance of financial risk management is exemplified by the recent financial crisis. In this

  5. Integrated Risk and Knowledge Management Program -- IRKM-P

    NASA Technical Reports Server (NTRS)

    Lengyel, David M.

    2009-01-01

    The NASA Exploration Systems Mission Directorate (ESMD) IRKM-P tightly couples risk management and knowledge management processes and tools to produce an effective "modern" work environment. IRKM-P objectives include: (1) to learn lessons from past and current programs (Apollo, Space Shuttle, and the International Space Station); (2) to generate and share new engineering design, operations, and management best practices through preexisting Continuous Risk Management (CRM) procedures and knowledge-management practices; and (3) to infuse those lessons and best practices into current activities. The conceptual framework of the IRKM-P is based on the assumption that risks highlight potential knowledge gaps that might be mitigated through one or more knowledge management practices or artifacts. These same risks also serve as cues for collection of knowledge particularly, knowledge of technical or programmatic challenges that might recur.

  6. Analysis of interactions among barriers in project risk management

    NASA Astrophysics Data System (ADS)

    Dandage, Rahul V.; Mantha, Shankar S.; Rane, Santosh B.; Bhoola, Vanita

    2018-03-01

    In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success of project management is oftentimes based on the understanding of barriers to effective risk management, application of appropriate risk management methodology, proactive leadership to avoid barriers, workers' attitude, adequate resources, organizational culture, and involvement of top management. This paper represents various risk categories and barriers to risk management in domestic and international projects through literature survey and feedback from project professionals. After analysing the various modelling methods used in project risk management literature, interpretive structural modelling (ISM) and MICMAC analysis have been used to analyse interactions among the barriers and prioritize them. The analysis indicates that lack of top management support, lack of formal training, and lack of addressing cultural differences are the high priority barriers, among many others.

  7. Communicating Risk to Program Managers

    NASA Technical Reports Server (NTRS)

    Shivers, C. Herbert

    2005-01-01

    Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

  8. Managing the risks of risk management on large fires

    Treesearch

    Donald G. MacGregor; Armando González-Cabán

    2013-01-01

    Large fires pose risks to a number of important values, including the ecology, property and the lives of incident responders. A relatively unstudied aspect of fire management is the risks to which incident managers are exposed due to organizational and sociopolitical factors that put them in a position of, for example, potential liability or degradation of their image...

  9. Periodontal Management by Risk Assessment: A Pragmatic Approach.

    PubMed

    Mullins, Joanna M; Even, Joshua B; White, Joel M

    2016-06-01

    An evidence-based periodontal disease risk assessment and diagnosis system has been developed and combined with a clinical decision support and management program to improve treatment and measure patient outcomes. There is little agreement on a universally accepted periodontal risk assessment, periodontal diagnosis, and treatment management tool and their incorporation into dental practice to improve patient care. This article highlights the development and use of a practical periodontal management and risk assessment program that can be implemented in dental settings. The approach taken by Willamette Dental Group to develop a periodontal disease risk assessment, periodontal diagnosis, and treatment management tool is described using evidence-based best practices. With goals of standardized treatment interventions while maintaining personalized care and improved communication, this process is described to facilitate its incorporation into other dental settings. Current electronic health records can be leveraged to enhance patient-centered care through the use of risk assessments and standardized guidelines to more effectively assess, diagnose, and treat patients to improve outcomes. Dental hygienists, and other committed providers, with their emphasis on prevention of periodontal disease can be principal drivers in creation and implementation of periodontal risk assessments and personalized treatment planning. Willamette Dental Group believes that such evidence-based tools can advance dentistry to new diagnostic and treatment standards. Copyright © 2016 Elsevier Inc. All rights reserved.

  10. Clinical risk management.

    PubMed

    Knowles, D

    Managing clinical risk involves all staff with clinical and managerial responsibilities. This article draws attention to some key steps in risk management and ways to deal with the problems when things do go wrong.

  11. Risk Management Issues - An Aerospace Perspective

    NASA Technical Reports Server (NTRS)

    Perera, Jeevan S.

    2011-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks--risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements.. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner, Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  12. Dream project: Applications of earth observations to disaster risk management

    NASA Astrophysics Data System (ADS)

    Dyke, G.; Gill, S.; Davies, R.; Betorz, F.; Andalsvik, Y.; Cackler, J.; Dos Santos, W.; Dunlop, K.; Ferreira, I.; Kebe, F.; Lamboglia, E.; Matsubara, Y.; Nikolaidis, V.; Ostoja-Starzewski, S.; Sakita, M.; Verstappen, N.

    2011-01-01

    The field of disaster risk management is relatively new and takes a structured approach to managing uncertainty related to the threat of natural and man-made disasters. Disaster risk management consists primarily of risk assessment and the development of strategies to mitigate disaster risk. This paper will discuss how increasing both Earth observation data and information technology capabilities can contribute to disaster risk management, particularly in Belize. The paper presents the results and recommendations of a project conducted by an international and interdisciplinary team of experts at the 2009 session of the International Space University in NASA Ames Research Center (California, USA). The aim is to explore the combination of current, planned and potential space-aided, airborne, and ground-based Earth observation tools, the emergence of powerful new web-based and mobile data management tools, and how this combination can support and improve the emerging field of disaster risk management. The starting point of the project was the World Bank's Comprehensive Approach to Probabilistic Risk Assessment (CAPRA) program, focused in Central America. This program was used as a test bed to analyze current space technologies used in risk management and develop new strategies and tools to be applied in other regions around the world.

  13. Improving organisational resilience through enterprise security risk management.

    PubMed

    Petruzzi, John; Loyear, Rachelle

    Enterprise Security Risk Management (ESRM) is a new philosophy and method of managing security programmes through the use of traditional risk principles. As a philosophy and life cycle, ESRM is focused on creating a business partnership between security practitioners and business leaders to more effectively provide protection against security risks in line with acceptable risk tolerances as defined by business asset owners and stakeholders. This paper explores the basics of the ESRM philosophy and life cycle and also shows how embracing the ESRM philosophy and implementing a risk-based security management model in the business organisation can lead to higher levels of organisational resilience as desired by organisation leaders, executives and the board of directors.

  14. Decisionmaking under risk in invasive species management: risk management theory and applications

    Treesearch

    Shefali V. Mehta; Robert G. Haight; Frances R. Homans

    2010-01-01

    Invasive species management is closely entwined with the assessment and management of risk that arises from the inherently random nature of the invasion process. The theory and application of risk management for invasive species with an economic perspective is reviewed in this synthesis. Invasive species management can be delineated into three general categories:...

  15. Risk management in waste water treatment.

    PubMed

    Wagner, M; Strube, I

    2005-01-01

    With the continuous restructuring of the water market due to liberalisation, privatisation and internationalisation processes, the requirements on waste water disposal companies have grown. Increasing competition requires a target-oriented and clearly structured procedure. At the same time it is necessary to meet the environment-relevant legal requirements and to design the processes to be environment-oriented. The implementation of risk management and the integration of such a management instrument in an existing system in addition to the use of modern technologies and procedures can help to make the operation of the waste water treatment safer and consequently strengthen market position. The risk management process consists of three phases, risk identification, risk analysis/risk assessment and risk handling, which are based on each other, as well as of the risk managing. To achieve an identification of the risks as complete as possible, a subdivision of the kind of risks (e.g. legal, financial, market, operational) is suggested. One possibility to assess risks is the portfolio method which offers clear representation. It allows a division of the risks into classes showing which areas need handling. The determination of the appropriate measures to handle a risk (e.g. avoidance, reduction, shift) is included in the concluding third phase. Different strategies can be applied here. On the one hand, the cause-oriented strategy, aiming at preventive measures which aim to reduce the probability of occurrence of a risk (e.g. creation of redundancy, systems with low susceptibility to malfunction). On the other hand, the effect-oriented strategy, aiming to minimise the level of damage in case of an undesired occurrence (e.g. use of alarm systems, insurance cover).

  16. Risk Management of NASA Projects

    NASA Technical Reports Server (NTRS)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  17. Risk-Based Contaminated Land Investigation and Assessment

    NASA Astrophysics Data System (ADS)

    Davis, Donald R.

    With increasing frequency, problems of environmental contamination are being analyzed from a risk perspective. Risk-Based Contaminated Land Investigation and Assessment is written for those who wish to present the results of their examination of contaminated land in terms of risk.The opening chapters introduce the concepts of risk analysis for contaminated land. Risk management and the risk assessment process are based on a source-pathway-target framework. Readers are warned against an “over-reliance on the identification of contaminants rather than the potential pathways by which targets may be exposed to these hazards.” In the risk management framework presented in this book, risk evaluation and resultant decision making are seen as part of both the risk assessment and risk reduction process. The sharp separation of risk assessment from risk management as seen in the National Academy of Sciences' (NAS) risk assessment paradigm is not advocatedsemi; perhaps this is because the NAS' concern was regulatory decision while the book's concern is the assessment of a specific site.

  18. Best practice vendor risk management in today's interconnected world.

    PubMed

    Beale, Ian

    2017-01-01

    This paper explains why vendor/third-party risk is so important to all organisations, as well as the principal risks that organisations must consider. It describes the responsibility of management to manage these risks with support from risk experts at the selection phase and through the ongoing relationship. Different sources of information about the management of the key risks and alternative ways of collecting the data are evaluated. The paper concludes by discussing how both customer and supplier organisations benefit from a balanced approach to risk management. The approach described in the paper applies to organisations of all types and sizes and can be applied to varied supply chains. The data and insights are based on research conducted by CEB.

  19. Issuance of Final Guidance: Ecological Risk Assessment and Risk Management Principles for Superfund Sites, October 7, 1999

    EPA Pesticide Factsheets

    This guidance is intended to help Superfund risk managers make ecological risk management decisions that are based on sound science, consistent across Regions, and present a characterization of site risks that is transparent to the public.

  20. Information Risk Management and Resilience

    NASA Astrophysics Data System (ADS)

    Dynes, Scott

    Are the levels of information risk management efforts within and between firms correlated with the resilience of the firms to information disruptions? This paper examines the question by considering the results of field studies of information risk management practices at organizations and in supply chains. The organizations investigated differ greatly in the degree of coupling from a general and information risk management standpoint, as well as in the levels of internal awareness and activity regarding information risk management. The comparison of the levels of information risk management in the firms and their actual or inferred resilience indicates that a formal information risk management approach is not necessary for resilience in certain sectors.

  1. Conceptualization and Pilot Testing of a Core Competency-Based Training Workshop in Suicide Risk Assessment and Management: Notes From the Field.

    PubMed

    Cramer, Robert J; Bryson, Claire N; Eichorst, Morgam K; Keyes, Lee N; Ridge, Brittany E

    2017-03-01

    As professional psychology training programs and continuing education have moved toward competency based approaches, it has become equally important to develop uniform, evidence-based approaches for suicide risk assessment and management. The present article presents a workshop curriculum based on established core competencies in suicide risk assessment and management. Drawing on theories suicide risk formation, the workshop features an integration of didactic, process, and experiential components. We present pilot data from 2 small group workshops (n = 17): 1 from a clinical psychology doctoral program and 1 from a university counseling center. Workshop participation yielded increases in (a) the ability to recognize appropriate clinician responses to suicidal client statements, (b) self-perceptions of general capacity to interface with suicidal patients and mastery of the 10 core competencies, (c) factual knowledge concerning suicide risk assessment and management, and (d) the self-rated ability to assess and manage a suicidal patient. We discuss statistical and generalizability limitations as well as implications for future modification, implementation, and provision of this training method. © 2016 Wiley Periodicals, Inc.

  2. Continuous Risk Management at NASA

    NASA Technical Reports Server (NTRS)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions. This risk management structure of functions has been taught to projects at all NASA Centers and is being successfully implemented on many projects. This presentation will give project managers the information they need to understand if risk management is to be effectively implemented on their projects at a cost they can afford.

  3. Case Study on Project Risk Management Planning Based on Soft System Methodology

    NASA Astrophysics Data System (ADS)

    Lifang, Xie; Jun, Li

    This paper analyzed the soft system characters of construction projects and the applicability on using Soft System Methodology (SSM) for risk analysis after a brief review of SSM. Taking a hydropower project as an example, it constructed the general frame of project risk management planning (PRMP) and established the Risk Management Planning (RMP) system from the perspective of the interests of co-ordination. This paper provided the ideas and methods for construction RMP under the win-win situation through the practice of SSM.

  4. Applying risk management strategies to strengthen an IDS's investment policy.

    PubMed

    Fine, R P

    1998-11-01

    The increased financial risk that not-for-profit integrated delivery systems have assumed to function under managed care has required them to become increasingly reliant on income and gains from their investment portfolios. This reliance underscores the need for these organizations to take steps to effectively manage their investment risk. Not-for-profit IDSs should establish a systematic approach to investment risk management that is based on maintaining a sound fiduciary infrastructure and having a clear understanding of risk exposures, the most important of which are policy and market risk. Applying reasonable and common-sense risk management strategies to investment policy will enhance an IDS's overall financial and competitive strength.

  5. Barriers to implementation of risk management for federal wildland fire management agencies in the United States

    Treesearch

    Dave Calkin; Matthew P. Thompson; Alan A. Ager; Mark Finney

    2010-01-01

    In this presentation we review progress towards the implementation of a risk-based management framework for U.S. Federal wildland fire policy and operations. We first describe new developments in wildfire simulation technology that catalyzed the development of risk-based decision support systems for strategic wildfire management. These systems include new analytical...

  6. Prioritizing chemicals for environmental management in China based on screening of potential risks

    NASA Astrophysics Data System (ADS)

    Yu, Xiangyi; Mao, Yan; Sun, Jinye; Shen, Yingwa

    2014-03-01

    The rapid development of China's chemical industry has created increasing pressure to improve the environmental management of chemicals. To bridge the large gap between the use and safe management of chemicals, we performed a comprehensive review of the international methods used to prioritize chemicals for environmental management. By comparing domestic and foreign methods, we confirmed the presence of this gap and identified potential solutions. Based on our literature review, we developed an appropriate screening method that accounts for the unique characteristics of chemical use within China. The proposed method is based on an evaluation using nine indices of the potential hazard posed by a chemical: three environmental hazard indices (persistence, bioaccumulation, and eco-toxicity), four health hazard indices (acute toxicity, carcinogenicity, mutagenicity, and reproductive and developmental toxicity), and two environmental exposure hazard indices (chemical amount and utilization pattern). The results of our screening agree with results of previous efforts from around the world, confirming the validity of the new system. The classification method will help decisionmakers to prioritize and identify the chemicals with the highest environmental risk, thereby providing a basis for improving chemical management in China.

  7. Multicriteria Decision Framework for Cybersecurity Risk Assessment and Management.

    PubMed

    Ganin, Alexander A; Quach, Phuoc; Panwar, Mahesh; Collier, Zachary A; Keisler, Jeffrey M; Marchese, Dayton; Linkov, Igor

    2017-09-05

    Risk assessors and managers face many difficult challenges related to novel cyber systems. Among these challenges are the constantly changing nature of cyber systems caused by technical advances, their distribution across the physical, information, and sociocognitive domains, and the complex network structures often including thousands of nodes. Here, we review probabilistic and risk-based decision-making techniques applied to cyber systems and conclude that existing approaches typically do not address all components of the risk assessment triplet (threat, vulnerability, consequence) and lack the ability to integrate across multiple domains of cyber systems to provide guidance for enhancing cybersecurity. We present a decision-analysis-based approach that quantifies threat, vulnerability, and consequences through a set of criteria designed to assess the overall utility of cybersecurity management alternatives. The proposed framework bridges the gap between risk assessment and risk management, allowing an analyst to ensure a structured and transparent process of selecting risk management alternatives. The use of this technique is illustrated for a hypothetical, but realistic, case study exemplifying the process of evaluating and ranking five cybersecurity enhancement strategies. The approach presented does not necessarily eliminate biases and subjectivity necessary for selecting countermeasures, but provides justifiable methods for selecting risk management actions consistent with stakeholder and decisionmaker values and technical data. Published 2017. This article is a U.S. Government work and is in the public domain in the U.S.A.

  8. Health Risk-Based Assessment and Management of Heavy Metals-Contaminated Soil Sites in Taiwan

    PubMed Central

    Lai, Hung-Yu; Hseu, Zeng-Yei; Chen, Ting-Chien; Chen, Bo-Ching; Guo, Horng-Yuh; Chen, Zueng-Sang

    2010-01-01

    Risk-based assessment is a way to evaluate the potential hazards of contaminated sites and is based on considering linkages between pollution sources, pathways, and receptors. These linkages can be broken by source reduction, pathway management, and modifying exposure of the receptors. In Taiwan, the Soil and Groundwater Pollution Remediation Act (SGWPR Act) uses one target regulation to evaluate the contamination status of soil and groundwater pollution. More than 600 sites contaminated with heavy metals (HMs) have been remediated and the costs of this process are always high. Besides using soil remediation techniques to remove contaminants from these sites, the selection of possible remediation methods to obtain rapid risk reduction is permissible and of increasing interest. This paper discusses previous soil remediation techniques applied to different sites in Taiwan and also clarified the differences of risk assessment before and after soil remediation obtained by applying different risk assessment models. This paper also includes many case studies on: (1) food safety risk assessment for brown rice growing in a HMs-contaminated site; (2) a tiered approach to health risk assessment for a contaminated site; (3) risk assessment for phytoremediation techniques applied in HMs-contaminated sites; and (4) soil remediation cost analysis for contaminated sites in Taiwan. PMID:21139851

  9. Advancements in Risk-Informed Performance-Based Asset Management for Commercial Nuclear Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liming, James K.; Ravindra, Mayasandra K.

    2006-07-01

    Over the past several years, ABSG Consulting Inc. (ABS Consulting) and the South Texas Project Nuclear Operating Company (STPNOC) have developed a decision support process and associated software for risk-informed, performance-based asset management (RIPBAM) of nuclear power plant facilities. RIPBAM applies probabilistic risk assessment (PRA) tools and techniques in the realm of plant physical and financial asset management. The RIPBAM process applies a tiered set of models and supporting performance measures (or metrics) that can ultimately be applied to support decisions affecting the allocation and management of plant resources (e.g., funding, staffing, scheduling, etc.). In general, the ultimate goal ofmore » the RIPBAM process is to continually support decision-making to maximize a facility's net present value (NPV) and long-term profitability for its owners. While the initial applications of RIPBAM have been for nuclear power stations, the methodology can easily be adapted to other types of power station or complex facility decision-making support. RIPBAM can also be designed to focus on performance metrics other than NPV and profitability (e.g., mission reliability, operational availability, probability of mission success per dollar invested, etc.). Recent advancements in the RIPBAM process focus on expanding the scope of previous RIPBAM applications to include not only operations, maintenance, and safety issues, but also broader risk perception components affecting plant owner (stockholder), operator, and regulator biases. Conceptually, RIPBAM is a comprehensive risk-informed cash flow model for decision support. It originated as a tool to help manage plant refueling outage scheduling, and was later expanded to include the full spectrum of operations and maintenance decision support. However, it differs from conventional business modeling tools in that it employs a systems engineering approach with broadly based probabilistic analysis of organizational

  10. Application of a risk management system to improve drinking water safety.

    PubMed

    Jayaratne, Asoka

    2008-12-01

    The use of a comprehensive risk management framework is considered a very effective means of managing water quality risks. There are many risk-based systems available to water utilities such as ISO 9001 and Hazard Analysis and Critical Control Point (HACCP). In 2004, the World Health Organization's (WHO) Guidelines for Drinking Water Quality recommended the use of preventive risk management approaches to manage water quality risks. This paper describes the framework adopted by Yarra Valley Water for the development of its Drinking Water Quality Risk Management Plan incorporating HACCP and ISO 9001 systems and demonstrates benefits of Water Safety Plans such as HACCP. Copyright IWA Publishing 2008.

  11. Guiding resource allocations based on terrorism risk.

    PubMed

    Willis, Henry H

    2007-06-01

    Establishing tolerable levels of risk is one of the most contentious and important risk management decisions. With every regulatory or funding decision for a risk management program, society decides whether or not risk is tolerable. The Urban Area Security Initiative (UASI) is a Department of Homeland Security (DHS) grant program designed to enhance security and overall preparedness to prevent, respond to, and recover from acts of terrorism by providing financial assistance for planning, equipment, training, and exercise needs of large urban areas. After briefly reviewing definitions of terrorism risk and rationales for risk-based resource allocation, this article compares estimates of terrorism risk in urban areas that received UASI funding in 2004 to other federal risk management decisions. This comparison suggests that UASI allocations are generally consistent with other federal risk management decisions. However, terrorism risk in several cities that received funding is below levels that are often tolerated in other risk management contexts. There are several reasons why the conclusions about terrorism risk being de minimis in specific cities should be challenged. Some of these surround the means used to estimate terrorism risk for this study. Others involve the comparison that is made to other risk management decisions. However, many of the observations reported are valid even if reported terrorism risk estimates are several orders of magnitude too low. Discussion of resource allocation should be extended to address risk tolerance and include explicit comparisons, like those presented here, to other risk management decisions.

  12. Risk Management Structured for Today's Environment

    NASA Technical Reports Server (NTRS)

    Greenfield, Michael A.

    1998-01-01

    In NPG (NASA Procedures and Guidelines) 7120.5A, we define risk management as "an organized, systematic decision-making process that efficiently identifies, analyzes, plans, tracks, controls, and communicates and documents risk in order to increase the likelihood of achieving program/project goals." Effective risk management depends upon a thorough understanding of the concept of risk, the principles of risk management and the formation of a disciplined risk management process. In human spaceflight programs, NASA has always maintained a rigorous and highly structured risk management effort. When lives are at stake, NASA's missions must be 100% safe; the risk management approach used in human spaceflight has always been comprehensive.

  13. Fatigue Risk Management: A Maritime Framework

    PubMed Central

    Grech, Michelle Rita

    2016-01-01

    It is evident that despite efforts directed at mitigating the risk of fatigue through the adoption of hours of work and rest regulations and development of codes and guidelines, fatigue still remains a concern in shipping. Lack of fatigue management has been identified as a contributory factor in a number of recent accidents. This is further substantiated through research reports with shortfalls highlighted in current fatigue management approaches. These approaches mainly focus on prescriptive hours of work and rest and include an individualistic approach to managing fatigue. The expectation is that seafarers are responsible to manage and tolerate fatigue as part of their working life at sea. This attitude is an accepted part of a seafarer’s role. Poor compliance is one manifest of this problem with shipboard demands making it hard for seafarers to follow hours of work and rest regulations, forcing them into this “poor compliance” trap. This makes current fatigue management approaches ineffective. This paper proposes a risk based approach and way forward for the implementation of a fatigue risk management framework for shipping, aiming to support the hours of work and rest requirements. This forms part of the work currently underway to review and update the International Maritime Organization, Guidelines on Fatigue. PMID:26840326

  14. Fatigue Risk Management: A Maritime Framework.

    PubMed

    Grech, Michelle Rita

    2016-01-29

    It is evident that despite efforts directed at mitigating the risk of fatigue through the adoption of hours of work and rest regulations and development of codes and guidelines, fatigue still remains a concern in shipping. Lack of fatigue management has been identified as a contributory factor in a number of recent accidents. This is further substantiated through research reports with shortfalls highlighted in current fatigue management approaches. These approaches mainly focus on prescriptive hours of work and rest and include an individualistic approach to managing fatigue. The expectation is that seafarers are responsible to manage and tolerate fatigue as part of their working life at sea. This attitude is an accepted part of a seafarer's role. Poor compliance is one manifest of this problem with shipboard demands making it hard for seafarers to follow hours of work and rest regulations, forcing them into this "poor compliance" trap. This makes current fatigue management approaches ineffective. This paper proposes a risk based approach and way forward for the implementation of a fatigue risk management framework for shipping, aiming to support the hours of work and rest requirements. This forms part of the work currently underway to review and update the International Maritime Organization, Guidelines on Fatigue.

  15. Potential impact of single-risk-factor versus total risk management for the prevention of cardiovascular events in Seychelles.

    PubMed

    Ndindjock, Roger; Gedeon, Jude; Mendis, Shanthi; Paccaud, Fred; Bovet, Pascal

    2011-04-01

    To assess the prevalence of cardiovascular (CV) risk factors in Seychelles, a middle-income African country, and compare the cost-effectiveness of single-risk-factor management (treating individuals with arterial blood pressure ≥ 140/90 mmHg and/or total serum cholesterol ≥ 6.2 mmol/l) with that of management based on total CV risk (treating individuals with a total CV risk ≥ 10% or ≥ 20%). CV risk factor prevalence and a CV risk prediction chart for Africa were used to estimate the 10-year risk of suffering a fatal or non-fatal CV event among individuals aged 40-64 years. These figures were used to compare single-risk-factor management with total risk management in terms of the number of people requiring treatment to avert one CV event and the number of events potentially averted over 10 years. Treatment for patients with high total CV risk (≥ 20%) was assumed to consist of a fixed-dose combination of several drugs (polypill). Cost analyses were limited to medication. A total CV risk of ≥ 10% and ≥ 20% was found among 10.8% and 5.1% of individuals, respectively. With single-risk-factor management, 60% of adults would need to be treated and 157 cardiovascular events per 100000 population would be averted per year, as opposed to 5% of adults and 92 events with total CV risk management. Management based on high total CV risk optimizes the balance between the number requiring treatment and the number of CV events averted. Total CV risk management is much more cost-effective than single-risk-factor management. These findings are relevant for all countries, but especially for those economically and demographically similar to Seychelles.

  16. Potential impact of single-risk-factor versus total risk management for the prevention of cardiovascular events in Seychelles

    PubMed Central

    Ndindjock, Roger; Gedeon, Jude; Mendis, Shanthi; Paccaud, Fred

    2011-01-01

    Abstract Objective To assess the prevalence of cardiovascular (CV) risk factors in Seychelles, a middle-income African country, and compare the cost-effectiveness of single-risk-factor management (treating individuals with arterial blood pressure ≥ 140/90 mmHg and/or total serum cholesterol ≥ 6.2 mmol/l) with that of management based on total CV risk (treating individuals with a total CV risk ≥ 10% or ≥ 20%). Methods CV risk factor prevalence and a CV risk prediction chart for Africa were used to estimate the 10-year risk of suffering a fatal or non-fatal CV event among individuals aged 40–64 years. These figures were used to compare single-risk-factor management with total risk management in terms of the number of people requiring treatment to avert one CV event and the number of events potentially averted over 10 years. Treatment for patients with high total CV risk (≥ 20%) was assumed to consist of a fixed-dose combination of several drugs (polypill). Cost analyses were limited to medication. Findings A total CV risk of ≥ 10% and ≥ 20% was found among 10.8% and 5.1% of individuals, respectively. With single-risk-factor management, 60% of adults would need to be treated and 157 cardiovascular events per 100 000 population would be averted per year, as opposed to 5% of adults and 92 events with total CV risk management. Management based on high total CV risk optimizes the balance between the number requiring treatment and the number of CV events averted. Conclusion Total CV risk management is much more cost-effective than single-risk-factor management. These findings are relevant for all countries, but especially for those economically and demographically similar to Seychelles. PMID:21479093

  17. Risk manager formula for success: Influencing decision making.

    PubMed

    Midgley, Mike

    2017-10-01

    Providing the ultimate decision makers with a quantitative risk analysis based on thoughtful assessment by the organization's experts enables an efficient decision. © 2017 American Society for Healthcare Risk Management of the American Hospital Association.

  18. Continuous Risk Management Course. Revised

    NASA Technical Reports Server (NTRS)

    Hammer, Theodore F.

    1999-01-01

    This document includes a course plan for Continuous Risk Management taught by the Software Assurance Technology Center along with the Continuous Risk Management Guidebook of the Software Engineering Institute of Carnegie Mellon University and a description of Continuous Risk Management at NASA.

  19. Integrated risk management

    NASA Technical Reports Server (NTRS)

    Hunsucker, J. L.

    1993-01-01

    The purpose of this report is to first present a basis or foundation for the building of an integrated risk management plan and them to present the plan. The integration referred to is across both the temporal and the hierarchical dimensions. Complexity, consequence, and credibility seem to be driving the need for the consideration of risk. Reduction of personal bias and reproducibility of the decision making process seem to be driving the consideration of a formal risk plan. While risk can be used as either a selection tool or a control tool, this paper concentrates on the selection usage. Risk relies on stated purpose. The tightness of the definition of purpose and success is directly reflected in the definition and control of risk. Much of a risk management plan could be designed by the answers to the questions of why, what, who, when, and where. However, any plan must provide the following information about a threat or risk: likelihood, consequence, predictability, reliability, and reproducibility. While the environment at NASA is seen as warm, but not hot, for the introduction of a risk program, some encouragement is seen if the following problems are addressed: no champion, no commitment of resource, confused definitions, lack of direction and focus, a hard sell, NASA culture, many choices of assessment methods, and cost. The plan is designed to follow the normal method of doing work and is structured to follow either the work break down structure or a functional structure very well. The parts of the plan include: defining purpose and success, initial threat assessment, initial risk assessment, reconciling threats and parameters, putting part of the information down and factoring the information back into the decision process as it comes back up, and developing inferences. Two major suggestions are presented. One is to build an office of risk management to be used as a resource by managers in doing the risk process. Another is to form a pilot program to try

  20. Influence of green supply chain risk management on performance of Chinese manufacturing enterprises

    NASA Astrophysics Data System (ADS)

    Zhang, Dongying; Yuting, Duan; Junyi, Shen

    2017-12-01

    This paper briefly introduces the background of the research on the impact of green supply chain risk management on corporate performance, reviews the relevant research literature at home and abroad, and uses the gray relational analysis to analyze the impact of the green supply chain risk management on enterprise performance based on 26 industry-related statistical data, from purchasing risk management performance,manufacturing risk management performance and marketing risk management performance.

  1. The NASA Continuous Risk Management Process

    NASA Technical Reports Server (NTRS)

    Pokorny, Frank M.

    2004-01-01

    As an intern this summer in the GRC Risk Management Office, I have become familiar with the NASA Continuous Risk Management Process. In this process, risk is considered in terms of the probability that an undesired event will occur and the impact of the event, should it occur (ref., NASA-NPG: 7120.5). Risk management belongs in every part of every project and should be ongoing from start to finish. Another key point is that a risk is not a problem until it has happened. With that in mind, there is a six step cycle for continuous risk management that prevents risks from becoming problems. The steps are: identify, analyze, plan, track, control, and communicate & document. Incorporated in the first step are several methods to identify risks such as brainstorming and using lessons learned. Once a risk is identified, a risk statement is made on a risk information sheet consisting of a single condition and one or more consequences. There can also be a context section where the risk is explained in more detail. Additionally there are three main goals of analyzing a risk, which are evaluate, classify, and prioritize. Here is where a value is given to the attributes of a risk &e., probability, impact, and timeframe) based on a multi-level classification system (e.g., low, medium, high). It is important to keep in mind that the definitions of these levels are probably different for each project. Furthermore the risks can be combined into groups. Then, the risks are prioritized to see what risk is necessary to mitigate first. After the risks are analyzed, a plan is made to mitigate as many risks as feasible. Each risk should be assigned to someone in the project with knowledge in the area of the risk. Then the possible approaches to choose from are: research, accept, watch, or mitigate. Next, all risks, mitigated or not, are tracked either individually or in groups. As the plan is executed, risks are re-evaluated, and the attribute values are adjusted as necessary. Metrics

  2. Risk management for food and beverage industry using Australia/New Zealand 4360 Standard

    NASA Astrophysics Data System (ADS)

    Kristina, S.; Wijaya, B. M.

    2017-12-01

    This research aims to identifying, measuring and establishing risk in food and beverage industry. The risk management is implemented by referring to Australia/New Zealand 4360 Standard which has four phases such as problem formulation, risk analysis, risk characterization, and risk management. The implementation of risk management is done by case study at Back Alley Café. Based on the risk identification result, there are 59 risks were found in Back Alley Café. The risk identification is conducted based on observation and interview with the café manager who understand the condition of Back Alley Café properly. Based on the assessment of impact and probability, the risk mapping produced four risks at extreme level, 16 risks at high level, 24 risks at medium level, and 18 risks at low level. The strategy was designed as the risk mitigation after the risk mapping for the extreme and high level. The strategy which is given as the prevention or treatment of risk in Back Alley Café is divided into three. There are reducing the risk, sharing the risk and accepting the risk. The strategy is then implemented for each relevant activities.

  3. RISK MANAGEMENT OF SEDIMENT STRESS: A FRAMEWORK FOR SEDIMENT RISK MANAGEMENT RESEARCH

    EPA Science Inventory

    Research related to the ecological risk management of sediment stress in watersheds is placed under a common conceptual framework in order to help promote the timely advance of decision support methods for aquatic resource managers and watershed-level planning. The proposed risk ...

  4. Developing risk-based screening guidelines for dioxin management at a Melbourne sewage treatment plant.

    PubMed

    Gorman, J; Mival, K; Wright, J; Howell, M

    2003-01-01

    Dioxin is a generic term used to refer to the congeners of polychlorinated dibenzo-p-dioxins (PCDDs) and polychlorinated dibenzofurans (PCDFs). The principal source of dioxin production is generally thought to be from unintended by-products of waste incineration, but dioxins are also naturally formed from volcanic activity and forest fires (WHO, 1998). Estimates of dioxin emissions in Australia suggest that approximately 75% of the total PCDD and PCDF emissions derive from prescribed burning and wild bushfires. Currently, no screening guidelines for dioxins within soils are available in Australia. This paper presents the general approach and results of a human health risk-based assessment performed by URS Australia in 2001 to develop site specific reference criteria for remediation of a former sewage plant in Melbourne. Risk-based soil remediation concentrations for dioxins at the sewage treatment plant site were developed using tolerable daily intake values of 4, 2 and 1 pg/kg/day. The potentially significant exposure pathways and processes for exposure to dioxins were identified and risk-based soil concentrations derived in accordance with the general method framework presented in the National Environmental Protection Measure (Assessment of Site Contamination). The derived dioxin reference criteria were used to develop an effective risk management program focussed on those conditions that present the greatest contribution to overall risk to human health.

  5. A novel community-based model to enhance health promotion, risk factor management and chronic disease prevention.

    PubMed

    Carson, Shannon Ryan; Carr, Caroline; Kohler, Graeme; Edwards, Lynn; Gibson, Rick; Sampalli, Tara

    2014-01-01

    Chronic disease is a highly expensive but preventable problem to the healthcare system. Evidence suggests that impacting modifiable behaviours and risk management factors in the areas of physical inactivity, unhealthy diet, stress and obesity can alleviate the burden of chronic disease problem to a large extent. Despite this recognition, the challenge is embedding these recognized priorities into the community and in primary care in a sustainable and meaningful manner. Primary Health Care in Capital Health responded to this challenge by developing and implementing a free, interprofessional and community-based service, namely, the Community Health Teams (CHTs), that offers health and wellness, risk factor management, wellness navigation and behaviour-based programming. In this paper, the development and implementation of the CHTs are discussed. Preliminary outcomes for the model are significant and promising. Formal and large-scale studies are planned to validate these outcomes with additional research rigour. Copyright © 2014 Longwoods Publishing.

  6. Li-Fraumeni syndrome: cancer risk assessment and clinical management.

    PubMed

    McBride, Kate A; Ballinger, Mandy L; Killick, Emma; Kirk, Judy; Tattersall, Martin H N; Eeles, Rosalind A; Thomas, David M; Mitchell, Gillian

    2014-05-01

    Carriers of germline mutations in the TP53 gene, encoding the cell-cycle regulator and tumour suppressor p53, have a markedly increased risk of cancer-related morbidity and mortality during both childhood and adulthood, and thus require appropriate and effective cancer risk management. However, the predisposition of such patients to multiorgan tumorigenesis presents a specific challenge for cancer risk management programmes. Herein, we review the clinical implications of germline mutations in TP53 and the evidence for cancer screening and prevention strategies in individuals carrying such mutations, as well as examining the potential psychosocial implications of lifelong management for a ubiquitous cancer risk. In addition, we propose an evidence-based framework for the clinical management of TP53 mutation carriers and provide a platform for addressing the management of other cancer predisposition syndromes that can affect multiple organs.

  7. Risk Preferences, Probability Weighting, and Strategy Tradeoffs in Wildfire Management.

    PubMed

    Hand, Michael S; Wibbenmeyer, Matthew J; Calkin, David E; Thompson, Matthew P

    2015-10-01

    Wildfires present a complex applied risk management environment, but relatively little attention has been paid to behavioral and cognitive responses to risk among public agency wildfire managers. This study investigates responses to risk, including probability weighting and risk aversion, in a wildfire management context using a survey-based experiment administered to federal wildfire managers. Respondents were presented with a multiattribute lottery-choice experiment where each lottery is defined by three outcome attributes: expenditures for fire suppression, damage to private property, and exposure of firefighters to the risk of aviation-related fatalities. Respondents choose one of two strategies, each of which includes "good" (low cost/low damage) and "bad" (high cost/high damage) outcomes that occur with varying probabilities. The choice task also incorporates an information framing experiment to test whether information about fatality risk to firefighters alters managers' responses to risk. Results suggest that managers exhibit risk aversion and nonlinear probability weighting, which can result in choices that do not minimize expected expenditures, property damage, or firefighter exposure. Information framing tends to result in choices that reduce the risk of aviation fatalities, but exacerbates nonlinear probability weighting. © 2015 Society for Risk Analysis.

  8. Risk-Based Models for Managing Data Privacy in Healthcare

    ERIC Educational Resources Information Center

    AL Faresi, Ahmed

    2011-01-01

    Current research in health care lacks a systematic investigation to identify and classify various sources of threats to information privacy when sharing health data. Identifying and classifying such threats would enable the development of effective information security risk monitoring and management policies. In this research I put the first step…

  9. Risk management through staff education.

    PubMed

    Seisser, M A; Epstein, A L

    1998-01-01

    The staff members of a healthcare organization are recognized as students of risk management. The risk manager, through application of the fundamentals of andragogy (i.e., learning strategies specific to adult learners), is in an advantageous position to assist staff in successfully applying risk management thought processes and related actions.

  10. [Legal and methodical aspects of occupational risk management].

    PubMed

    2011-01-01

    Legal and methodical aspects of occupational risk management (ORM) are considered with account of new official documents. Introduction of risk and risk management notions into Labor Code reflects the change of forms of occupational health and safety. The role of hygienist and occupational medicine professionals in workplace conditions certification (WCC) and periodical medical examinations (PME) is strengthened. The ORM could be improved by introducing the block of prognosis and causation based on IT-technologies that could match systems of WCC and PME thus improving the effectiveness of prophylactics.

  11. Risk Management Model in Surface Exploitation of Mineral Deposits

    NASA Astrophysics Data System (ADS)

    Stojanović, Cvjetko

    2016-06-01

    Risk management is an integrative part of all types of project management. One of the main tasks of pre-investment studies and other project documentation is the tendency to protect investment projects as much as possible against investment risks. Therefore, the provision and regulation of risk information ensure the identification of the probability of the emergence of adverse events, their forms, causes and consequences, and provides a timely measures of protection against risks. This means that risk management involves a set of management methods and techniques used to reduce the possibility of realizing the adverse events and consequences and thus increase the possibilities of achieving the planned results with minimal losses. Investment in mining projects are of capital importance because they are very complex projects, therefore being very risky, because of the influence of internal and external factors and limitations arising from the socio-economic environment. Due to the lack of a risk management system, numerous organizations worldwide have suffered significant financial losses. Therefore, it is necessary for any organization to establish a risk management system as a structural element of system management system as a whole. This paper presents an approach to a Risk management model in the project of opening a surface coal mine, developed based on studies of extensive scientific literature and personal experiences of the author, and which, with certain modifications, may find use for any investment project, both in the mining industry as well as in investment projects in other areas.

  12. Risk Management in Cocurricular Activities.

    ERIC Educational Resources Information Center

    Webb, Edward M.

    1988-01-01

    Discusses risk management for colleges' cocurricular activities. Discusses tort liability, contributory negligence, and assumption of risk. Provides six concrete steps for managing risks responsibly and professionally: adopting an educational mission statement, assigning risk to others, establishing safety standards, training club advisors,…

  13. A challenge for land and risk managers: differents stakeholders, differents definitions of the risks

    NASA Astrophysics Data System (ADS)

    Fernandez, M.; Ruegg, J.

    2012-04-01

    In developing countries, mountain populations and territories are subject to multiple risks and vulnerabilities. In addition, they face even greater challenges than developed countries due to lack of knowledge, resources and technology. There are many different types of actors in society that manage risk at various scales and levels (i.e. engineers, geologists, administrators, land use planners, merchants and local indigenous and non-indigenous people). Because of limited resources and possibilities to reduce all types of risk, these different actors, or 'risk managers' have to choose and compete to prioritize which types of risks to address. This paper addresses a case study from San Cristobal Altaverapaz, Guatemala where a large landslide "Los Chorros", a catastrophic collapse of 6 millions cubic meters of rock, is affecting several communities and one of the country's main west-east access highways. In this case, the government established that the "primary" risk is the landslide, whereas other local stakeholders consider the primary risks to be economic This paper, situated at the cross section between political science, geography and disaster risk management, addresses the social conflict and competition for priorities and solutions for risk management, depending on the group of actors based on the on-going Los Chorros, Guatemala landslide mitigation process. This work is based on the analysis of practices, (Practical Science), policies and institutions in order to understand how the inclusion of multiple stakeholders in determining risk priorities can lead to more sustainable risk management in a given territory. The main objective of this investigation is first to identify and understand the juxtaposition of different readings of the risk equation, usually considered the interface between vulnerability, exposure and hazards. Secondly, it is to analyze the mechanisms of actions taken by various stakeholders, or risk managers. The analysis focuses on the

  14. On the Risk Management and Auditing of SOA Based Business Processes

    NASA Astrophysics Data System (ADS)

    Orriens, Bart; Heuvel, Willem-Jan V./D.; Papazoglou, Mike

    SOA-enabled business processes stretch across many cooperating and coordinated systems, possibly crossing organizational boundaries, and technologies like XML and Web services are used for making system-to-system interactions commonplace. Business processes form the foundation for all organizations, and as such, are impacted by industry regulations. This requires organizations to review their business processes and ensure that they meet the compliance standards set forth in legislation. In this paper we sketch a SOA-based service risk management and auditing methodology including a compliance enforcement and verification system that assures verifiable business process compliance. This is done on the basis of a knowledge-based system that allows integration of internal control systems into business processes conform pre-defined compliance rules, monitor both the normal process behavior and those of the control systems during process execution, and log these behaviors to facilitate retrospective auditing.

  15. A phased approach to induced seismicity risk management

    DOE PAGES

    White, Joshua A.; Foxall, William

    2014-01-01

    This work describes strategies for assessing and managing induced seismicity risk during each phase of a carbon storage project. We consider both nuisance and damage potential from induced earthquakes, as well as the indirect risk of enhancing fault leakage pathways. A phased approach to seismicity management is proposed, in which operations are continuously adapted based on available information and an on-going estimate of risk. At each project stage, specific recommendations are made for (a) monitoring and characterization, (b) modeling and analysis, and (c) site operations. The resulting methodology can help lower seismic risk while ensuring site operations remain practical andmore » cost-effective.« less

  16. Manual of Educational Risk Management.

    ERIC Educational Resources Information Center

    Cody, Frank J.; Dise, John H., Jr.

    This is the first risk management publication for school administrators that attempts to be comprehensive by addressing all potential areas of risk to school districts and offering specific guidelines on how to manage those areas. Chapter 1 gives directions on how to use the manual. Chapter 2 contains a complete overview of risk management,…

  17. Children's Aquatics: Managing the Risk.

    ERIC Educational Resources Information Center

    Langendorfer, Stephen; And Others

    1989-01-01

    This article identifies the major risks faced by young children in aquatic programs, outlines several methods for managing risk factors, and discusses the steps involved in implementing a risk-management system. (IAH)

  18. Uncertainty and risk in wildland fire management: a review.

    PubMed

    Thompson, Matthew P; Calkin, Dave E

    2011-08-01

    Wildland fire management is subject to manifold sources of uncertainty. Beyond the unpredictability of wildfire behavior, uncertainty stems from inaccurate/missing data, limited resource value measures to guide prioritization across fires and resources at risk, and an incomplete scientific understanding of ecological response to fire, of fire behavior response to treatments, and of spatiotemporal dynamics involving disturbance regimes and climate change. This work attempts to systematically align sources of uncertainty with the most appropriate decision support methodologies, in order to facilitate cost-effective, risk-based wildfire planning efforts. We review the state of wildfire risk assessment and management, with a specific focus on uncertainties challenging implementation of integrated risk assessments that consider a suite of human and ecological values. Recent advances in wildfire simulation and geospatial mapping of highly valued resources have enabled robust risk-based analyses to inform planning across a variety of scales, although improvements are needed in fire behavior and ignition occurrence models. A key remaining challenge is a better characterization of non-market resources at risk, both in terms of their response to fire and how society values those resources. Our findings echo earlier literature identifying wildfire effects analysis and value uncertainty as the primary challenges to integrated wildfire risk assessment and wildfire management. We stress the importance of identifying and characterizing uncertainties in order to better quantify and manage them. Leveraging the most appropriate decision support tools can facilitate wildfire risk assessment and ideally improve decision-making. Published by Elsevier Ltd.

  19. Risk-trading in flood management: An economic model.

    PubMed

    Chang, Chiung Ting

    2017-09-15

    Although flood management is no longer exclusively a topic of engineering, flood mitigation continues to be associated with hard engineering options. Flood adaptation or the capacity to adapt to flood risk, as well as a demand for internalizing externalities caused by flood risk between regions, complicate flood management activities. Even though integrated river basin management has long been recommended to resolve the above issues, it has proven difficult to apply widely, and sometimes even to bring into existence. This article explores how internalization of externalities as well as the realization of integrated river basin management can be encouraged via the use of a market-based approach, namely a flood risk trading program. In addition to maintaining efficiency of optimal resource allocation, a flood risk trading program may also provide a more equitable distribution of benefits by facilitating decentralization. This article employs a graphical analysis to show how flood risk trading can be implemented to encourage mitigation measures that increase infiltration and storage capacity. A theoretical model is presented to demonstrate the economic conditions necessary for flood risk trading. Copyright © 2017 Elsevier Ltd. All rights reserved.

  20. Confluence and Contours: Reflexive Management of Environmental Risk.

    PubMed

    Soane, Emma; Schubert, Iljana; Pollard, Simon; Rocks, Sophie; Black, Edgar

    2016-06-01

    Government institutions have responsibilities to distribute risk management funds meaningfully and to be accountable for their choices. We took a macro-level sociological approach to understanding the role of government in managing environmental risks, and insights from micro-level psychology to examine individual-level risk-related perceptions and beliefs. Survey data from 2,068 U.K. citizens showed that lay people's funding preferences were associated positively with beliefs about responsibility and trust, yet associations with perception varied depending on risk type. Moreover, there were risk-specific differences in the funding preferences of the lay sample and 29 policymakers. A laboratory-based study of 109 participants examined funding allocation in more detail through iterative presentation of expert information. Quantitative and qualitative data revealed a meso-level framework comprising three types of decisionmakers who varied in their willingness to change funding allocation preferences following expert information: adaptors, responders, and resistors. This research highlights the relevance of integrated theoretical approaches to understanding the policy process, and the benefits of reflexive dialogue to managing environmental risks. © 2015 Society for Risk Analysis.

  1. [The relevance of clinical risk management].

    PubMed

    Gulino, Matteo; Vergallo, Gianluca Montanari; Frati, Paola

    2011-01-01

    Medical activity includes a risk of possible injury or complications for the patients, that should drive the Health Care Institutions to introduce and/ or improve clinical Risk management instruments. Although Italy is still lacking a National project of Clinical Risk Management, a number of efforts have been made by different Italian Regions to introduce instruments of risk management. In addition, most of National Health Care Institutions include actually a Department specifically in charge to manage the clinical risk. Despite the practical difficulties, the results obtained until now suggest that the risk management may represent a useful instrument to contribute to the reduction of errors in clinical conduct. Indeed, the introduction of adequate instruments of prevention and management of clinical risk may help to ameliorate the quality of health care Institution services.

  2. Managing perceived operational risk factors for effective supply-chain management

    NASA Astrophysics Data System (ADS)

    Sylla, Cheickna

    2014-12-01

    This research is part of a large scale comprehensive mathematical and empirical modeling investigation projects aimed at developing a better understanding of supply-chain risk management by offering a comprehensive framework including theoretical elements and empirical evidence based on managers' perception of improved organizational level of preparedness to safeguard against the threats of disruptions, delays and stoppage in the supply chain. More specifically, this paper reports the empirical investigation conducted using 92 companies in several eastern USA regions involved in international trades with global supply chains. Among the 56 general hypotheses investigated, the results support that managers strive to balance their control and decision impacts to mold their responses to risk factors with knowledge of the extent of cost consequences as stated in previous research. However, the results also propose new findings which significantly vary from previous research reports.

  3. Nurse-led clinics for atrial fibrillation: managing risk factors.

    PubMed

    Jacob, Liril

    2017-12-14

    Atrial fibrillation (AF) is the most common and sustained cardiac arrhythmia rated by cardiologists as one of the most difficult conditions to manage. Traditionally, AF management has focused on the three pillars of rate control, rhythm control and anticoagulation. However, more recently, cardiovascular risk-factor management in AF has emerged as a fourth and essential pillar, delivering improved patient outcomes. In the UK, AF is a condition that is often managed poorly, with patients reporting a lack of understanding of their condition and treatment options. Many aspects of assessment and communication in AF management are time consuming. Failure to address those aspects may negatively affect the quality of care. Nurse-led clinics can contribute significantly in the areas of patient education and sustained follow-up care, improving outcomes and addressing current deficiencies in AF risk-factor management due to scarcity of medical resources. This article discusses the major cardiovascular risk factors associated with AF, drawing on evidence from the literature, and considers the effectiveness and implications for practice of introducing community-based nurse-led clinics for risk-factor management in patients with AF.

  4. Disaster Risk Management and Measurement Indicators for Cultural Heritage in Taiwan

    NASA Astrophysics Data System (ADS)

    Yen, Y. N.; Cheng, C. F.; Cheng, H. M.

    2015-08-01

    Under the influence of global climate change, the risk preparedness has become a universal issue in different research fields. In the conservation of cultural heritage, disaster risk management is becoming one of the major research topics. Besides researches on the theory and mechanism of disaster risk management, the tools for the performance of site managers to protect cultural heritage is another important issue that needs development. UNESCO and ICOMOS have released some important documents on disaster risk management including its concept, identification, evaluation, mitigation, monitoring and resilience, etc. However, there is a big gap between concept and implementation in Taiwan. Presently there are 2000 monuments in Taiwan that hardly meet the modern code. First, based on international documents released, this research presents 13 disaster indicators on monuments and their environments. Next, 345 monuments in northern Taiwan are taken as examples to evaluate their risk situations with indicators designed in 2011. Some positive recommendations were given at the same time. As a result, a comparative evaluation was completed in 2012 and some key issues are found, such as too many electrical facilities, lack of efficient firefighting equipment, and a shortage of management mechanism, just to name a few. Through the improvement of the management, some major risk can be mitigated. In 2013~14, this research took 23 national monuments from the 345 monuments to evaluate their risk situations and compare the differences between national and local monuments. Results show that almost all management mechanisms in the national monuments have been established and are running well. However, problems like inappropriate electrical facilities and insufficient monitoring equipment remain. In addition, the performance of private monuments is not as good as public ones. Based on the collected information and evaluation, this research develops safety measures of heritage

  5. Identifying risks in the realm of enterprise risk management.

    PubMed

    Carroll, Roberta

    2016-01-01

    An enterprise risk management (ERM) discipline is comprehensive and organization-wide. The effectiveness of ERM is governed in part by the strength and breadth of its practices and processes. An essential element in decision making is a thorough process by which organizational risks and value opportunities can be identified. This article will offer identification techniques that go beyond those used in traditional risk management programs and demonstrate how these techniques can be used to identify risks and opportunity in the ERM environment. © 2016 American Society for Healthcare Risk Management of the American Hospital Association.

  6. Police response to domestic violence: making decisions about risk and risk management.

    PubMed

    Perez Trujillo, Monica; Ross, Stuart

    2008-04-01

    Assessing and responding to risk are key elements in how police respond to domestic violence. However, relatively little is known about the way police make judgments about the risks associated with domestic violence and how these judgments influence their actions. This study examines police decisions about risk in domestic violence incidents when using a risk assessment instrument. Based on a sample of 501 risk assessments completed by police in Australia, this study shows that a limited number of items on the risk assessment instrument are important in police officers' decisions about risk. Statistical analyses show that the victim's level of fear contributes to police officers' judgment on the level of risk and their decisions on which risk management strategy should be used. These findings suggest that research on police responses to domestic violence needs to pay greater attention to situational dynamics and the task requirements of risk-based decision making.

  7. Quality risk management in pharmaceutical development.

    PubMed

    Charoo, Naseem Ahmad; Ali, Areeg Anwer

    2013-07-01

    The objective of ICH Q8, Q9 and Q10 documents is application of systemic and science based approach to formulation development for building quality into product. There is always some uncertainty in new product development. Good risk management practice is essential for success of new product development in decreasing this uncertainty. In quality by design paradigm, the product performance properties relevant to the patient are predefined in target product profile (TPP). Together with prior knowledge and experience, TPP helps in identification of critical quality attributes (CQA's). Initial risk assessment which identifies risks to these CQA's provides impetus for product development. Product and process are designed to gain knowledge about these risks, devise strategies to eliminate or mitigate these risks and meet objectives set in TPP. By laying more emphasis on high risk events the protection level of patient is increased. The process being scientifically driven improves the transparency and reliability of the manufacturer. The focus on risk to the patient together with flexible development approach saves invaluable resources, increases confidence on quality and reduces compliance risk. The knowledge acquired in analysing risks to CQA's permits construction of meaningful design space. Within the boundaries of the design space, variation in critical material characteristics and process parameters must be managed in order to yield a product having the desired characteristics. Specifications based on product and process understanding are established such that product will meet the specifications if tested. In this way, the product is amenable to real time release, since specifications only confirm quality but they do not serve as a means of effective process control.

  8. 12 CFR 917.3 - Risk management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 8 2012-01-01 2012-01-01 false Risk management. 917.3 Section 917.3 Banks and Banking FEDERAL HOUSING FINANCE BOARD GOVERNANCE AND MANAGEMENT OF THE FEDERAL HOME LOAN BANKS POWERS AND RESPONSIBILITIES OF BANK BOARDS OF DIRECTORS AND SENIOR MANAGEMENT § 917.3 Risk management. (a) Risk management...

  9. 12 CFR 917.3 - Risk management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 8 2013-01-01 2013-01-01 false Risk management. 917.3 Section 917.3 Banks and Banking FEDERAL HOUSING FINANCE BOARD GOVERNANCE AND MANAGEMENT OF THE FEDERAL HOME LOAN BANKS POWERS AND RESPONSIBILITIES OF BANK BOARDS OF DIRECTORS AND SENIOR MANAGEMENT § 917.3 Risk management. (a) Risk management...

  10. 12 CFR 917.3 - Risk management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 7 2011-01-01 2011-01-01 false Risk management. 917.3 Section 917.3 Banks and Banking FEDERAL HOUSING FINANCE BOARD GOVERNANCE AND MANAGEMENT OF THE FEDERAL HOME LOAN BANKS POWERS AND RESPONSIBILITIES OF BANK BOARDS OF DIRECTORS AND SENIOR MANAGEMENT § 917.3 Risk management. (a) Risk management...

  11. 12 CFR 917.3 - Risk management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Risk management. 917.3 Section 917.3 Banks and Banking FEDERAL HOUSING FINANCE BOARD GOVERNANCE AND MANAGEMENT OF THE FEDERAL HOME LOAN BANKS POWERS AND RESPONSIBILITIES OF BANK BOARDS OF DIRECTORS AND SENIOR MANAGEMENT § 917.3 Risk management. (a) Risk management...

  12. An Extensible Information Grid for Risk Management

    NASA Technical Reports Server (NTRS)

    Maluf, David A.; Bell, David G.

    2003-01-01

    This paper describes recent work on developing an extensible information grid for risk management at NASA - a RISK INFORMATION GRID. This grid is being developed by integrating information grid technology with risk management processes for a variety of risk related applications. To date, RISK GRID applications are being developed for three main NASA processes: risk management - a closed-loop iterative process for explicit risk management, program/project management - a proactive process that includes risk management, and mishap management - a feedback loop for learning from historical risks that escaped other processes. This is enabled through an architecture involving an extensible database, structuring information with XML, schemaless mapping of XML, and secure server-mediated communication using standard protocols.

  13. Managing information technology security risk

    NASA Technical Reports Server (NTRS)

    Gilliam, David

    2003-01-01

    Information Technology (IT) Security Risk Management is a critical task for the organization to protect against the loss of confidentiality, integrity and availability of IT resources. As systems bgecome more complex and diverse and and attacks from intrusions and malicious content increase, it is becoming increasingly difficult to manage IT security risk. This paper describes a two-pronged approach in addressing IT security risk and risk management in the organization: 1) an institutional enterprise appraoch, and 2) a project life cycle approach.

  14. Effects of risk attitudes on extended attack fire management decisionmaking

    Treesearch

    Donald G. MacGregor; Armando González-Cabán

    2009-01-01

    Fire management inherently involves the assessment and management of risk, and decision making under uncertainty. Although organizational standards and guides are an important determinant of how decision problems are structured and framed, decision makers may view risk-based decisions from a perspective that is unique to their background and experience. Previous...

  15. 42 CFR 441.476 - Risk management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Risk management. 441.476 Section 441.476 Public... Self-Directed Personal Assistance Services Program § 441.476 Risk management. (a) The State must... plan for how identified risks will be mitigated. (d) The State must ensure that the risk management...

  16. 42 CFR 441.476 - Risk management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Risk management. 441.476 Section 441.476 Public... Self-Directed Personal Assistance Services Program § 441.476 Risk management. (a) The State must... plan for how identified risks will be mitigated. (d) The State must ensure that the risk management...

  17. 42 CFR 441.476 - Risk management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Risk management. 441.476 Section 441.476 Public... Self-Directed Personal Assistance Services Program § 441.476 Risk management. (a) The State must... plan for how identified risks will be mitigated. (d) The State must ensure that the risk management...

  18. 42 CFR 441.476 - Risk management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Risk management. 441.476 Section 441.476 Public... Self-Directed Personal Assistance Services Program § 441.476 Risk management. (a) The State must... plan for how identified risks will be mitigated. (d) The State must ensure that the risk management...

  19. 42 CFR 441.476 - Risk management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Risk management. 441.476 Section 441.476 Public... Self-Directed Personal Assistance Services Program § 441.476 Risk management. (a) The State must... plan for how identified risks will be mitigated. (d) The State must ensure that the risk management...

  20. Application of risk-based multiple criteria decision analysis for selection of the best agricultural scenario for effective watershed management.

    PubMed

    Javidi Sabbaghian, Reza; Zarghami, Mahdi; Nejadhashemi, A Pouyan; Sharifi, Mohammad Bagher; Herman, Matthew R; Daneshvar, Fariborz

    2016-03-01

    Effective watershed management requires the evaluation of agricultural best management practice (BMP) scenarios which carefully consider the relevant environmental, economic, and social criteria involved. In the Multiple Criteria Decision-Making (MCDM) process, scenarios are first evaluated and then ranked to determine the most desirable outcome for the particular watershed. The main challenge of this process is the accurate identification of the best solution for the watershed in question, despite the various risk attitudes presented by the associated decision-makers (DMs). This paper introduces a novel approach for implementation of the MCDM process based on a comparative neutral risk/risk-based decision analysis, which results in the selection of the most desirable scenario for use in the entire watershed. At the sub-basin level, each scenario includes multiple BMPs with scores that have been calculated using the criteria derived from two cases of neutral risk and risk-based decision-making. The simple additive weighting (SAW) operator is applied for use in neutral risk decision-making, while the ordered weighted averaging (OWA) and induced OWA (IOWA) operators are effective for risk-based decision-making. At the watershed level, the BMP scores of the sub-basins are aggregated to calculate each scenarios' combined goodness measurements; the most desirable scenario for the entire watershed is then selected based on the combined goodness measurements. Our final results illustrate the type of operator and risk attitudes needed to satisfy the relevant criteria within the number of sub-basins, and how they ultimately affect the final ranking of the given scenarios. The methodology proposed here has been successfully applied to the Honeyoey Creek-Pine Creek watershed in Michigan, USA to evaluate various BMP scenarios and determine the best solution for both the stakeholders and the overall stream health. Copyright © 2015 Elsevier Ltd. All rights reserved.

  1. A new evidence-based risk stratification system for cutaneous squamous cell carcinoma into low, intermediate, and high risk groups with implications for management.

    PubMed

    Baum, Christian L; Wright, Adam C; Martinez, Juan-Carlos; Arpey, Christopher J; Brewer, Jerry D; Roenigk, Randall K; Otley, Clark C

    2018-01-01

    Most primary cutaneous squamous cell carcinomas are cured with surgery. A subset, however, may develop local and nodal metastasis that may eventuate in disease-specific; death. This subset has been variably termed high risk. Herein, we review; an emerging body of data on the risks of these outcomes and propose an evidence-based; risk stratification for low-, intermediate-, and high-risk tumors that takes into; account both tumor and patient characteristics. Finally, we discuss a framework for; management of these tumors on the basis of data, when available, and our; recommendations when data are sparse. Copyright © 2017 American Academy of Dermatology, Inc. Published by Elsevier Inc. All rights reserved.

  2. Research on Occupational Safety, Health Management and Risk Control Technology in Coal Mines.

    PubMed

    Zhou, Lu-Jie; Cao, Qing-Gui; Yu, Kai; Wang, Lin-Lin; Wang, Hai-Bin

    2018-04-26

    This paper studies the occupational safety and health management methods as well as risk control technology associated with the coal mining industry, including daily management of occupational safety and health, identification and assessment of risks, early warning and dynamic monitoring of risks, etc.; also, a B/S mode software (Geting Coal Mine, Jining, Shandong, China), i.e., Coal Mine Occupational Safety and Health Management and Risk Control System, is developed to attain the aforementioned objectives, namely promoting the coal mine occupational safety and health management based on early warning and dynamic monitoring of risks. Furthermore, the practical effectiveness and the associated pattern for applying this software package to coal mining is analyzed. The study indicates that the presently developed coal mine occupational safety and health management and risk control technology and the associated software can support the occupational safety and health management efforts in coal mines in a standardized and effective manner. It can also control the accident risks scientifically and effectively; its effective implementation can further improve the coal mine occupational safety and health management mechanism, and further enhance the risk management approaches. Besides, its implementation indicates that the occupational safety and health management and risk control technology has been established based on a benign cycle involving dynamic feedback and scientific development, which can provide a reliable assurance to the safe operation of coal mines.

  3. Research on Occupational Safety, Health Management and Risk Control Technology in Coal Mines

    PubMed Central

    Zhou, Lu-jie; Cao, Qing-gui; Yu, Kai; Wang, Lin-lin; Wang, Hai-bin

    2018-01-01

    This paper studies the occupational safety and health management methods as well as risk control technology associated with the coal mining industry, including daily management of occupational safety and health, identification and assessment of risks, early warning and dynamic monitoring of risks, etc.; also, a B/S mode software (Geting Coal Mine, Jining, Shandong, China), i.e., Coal Mine Occupational Safety and Health Management and Risk Control System, is developed to attain the aforementioned objectives, namely promoting the coal mine occupational safety and health management based on early warning and dynamic monitoring of risks. Furthermore, the practical effectiveness and the associated pattern for applying this software package to coal mining is analyzed. The study indicates that the presently developed coal mine occupational safety and health management and risk control technology and the associated software can support the occupational safety and health management efforts in coal mines in a standardized and effective manner. It can also control the accident risks scientifically and effectively; its effective implementation can further improve the coal mine occupational safety and health management mechanism, and further enhance the risk management approaches. Besides, its implementation indicates that the occupational safety and health management and risk control technology has been established based on a benign cycle involving dynamic feedback and scientific development, which can provide a reliable assurance to the safe operation of coal mines. PMID:29701715

  4. Managing Cardiovascular Disease Risk in Rheumatoid Arthritis: Clinical Updates and Three Strategic Approaches.

    PubMed

    Chodara, Ann M; Wattiaux, Aimée; Bartels, Christie M

    2017-04-01

    ᅟ: The increase in cardiovascular disease (CVD) risk in rheumatoid arthritis (RA) is well known; however, appropriate management of this elevated risk in rheumatology clinics is less clear. By critically reviewing literature published within the past 5 years, we aim to clarify current knowledge and gaps regarding CVD risk management in RA. We examine recent guidelines, recommendations, and evidence and discuss three approaches: (1) RA-specific management including treat-to-target and medication management, (2) assessment of comprehensive individual risk, and (3) targeting traditional CVD risk factors (hypertension, smoking, hyperlipidemia, diabetes, obesity, and physical inactivity) at a population level. Considering that 75% of US RA visits occur in specialty clinics, further research is needed regarding evidence-based strategies to manage and reduce CVD risk in RA. This review highlights clinical updates including US cardiology and international professional society guidelines, successful evidence-based population approaches from primary care, and novel opportunities in rheumatology care to reduce CVD risk in RA.

  5. Towards risk-based drought management in the Netherlands: quantifying the welfare effects of water shortage

    NASA Astrophysics Data System (ADS)

    van der Vat, Marnix; Femke, Schasfoort; Rhee Gigi, Van; Manfred, Wienhoven; Nico, Polman; Joost, Delsman; den Hoek Paul, Van; Maat Judith, Ter; Marjolein, Mens

    2016-04-01

    It is widely acknowledged that drought management should move from a crisis to a risk-based approach. A risk-based approach to managing water resources requires a sound drought risk analysis, quantifying the probability and impacts of water shortage due to droughts. Impacts of droughts are for example crop yield losses, hydropower production losses, and water shortage for municipal and industrial use. Many studies analyse the balance between supply and demand, but there is little experience in translating this into economic metrics that can be used in a decision-making process on investments to reduce drought risk. We will present a drought risk analysis method for the Netherlands, with a focus on the underlying economic method to quantify the welfare effects of water shortage for different water users. Both the risk-based approach as well as the economic valuation of water shortage for various water users was explored in a study for the Dutch Government. First, an historic analysis of the effects of droughts on revenues and prices in agriculture as well as on shipping and nature was carried out. Second, a drought risk analysis method was developed that combines drought hazard and drought impact analysis in a probabilistic way for various sectors. This consists of a stepwise approach, from water availability through water shortage to economic impact, for a range of drought events with a certain return period. Finally, a local case study was conducted to test the applicability of the drought risk analysis method. Through the study, experience was gained into integrating hydrological and economic analyses, which is a prerequisite for drought risk analysis. Results indicate that the risk analysis method is promising and applicable for various sectors. However, it was also found that quantification of economic impacts from droughts is time-consuming, because location- and sector-specific data is needed, which is not always readily available. Furthermore, for some

  6. Bicycle Commuting and Exposure to Air Pollution: A Questionnaire-Based Investigation of Perceptions, Symptoms, and Risk Management Strategies.

    PubMed

    Cole-Hunter, Tom; Morawska, Lidia; Solomon, Colin

    2015-04-01

    An increase in bicycle commuting participation may improve public health and traffic congestion in cities. Information on air pollution exposure (such as perception, symptoms, and risk management) contributes to the responsible promotion of bicycle commuting participation. To determine perceptions, symptoms, and willingness for specific exposure risk management strategies of exposure to air pollution, a questionnaire-based cross-sectional investigation was conducted with adult bicycle commuters (n = 153; age = 41 ± 11 years; 28% female). Frequency of acute respiratory signs and symptoms were positively associated with in-commute and postcommute compared with precommute time periods (P < .05); there was greater positive association with respiratory disorder compared with healthy, and female compared with male, participants. The perception (but not signs or symptoms) of in-commute exposure to air pollution was positively associated with the estimated level of in-commute proximity to motorized traffic. The majority of participants indicated a willingness (which varied with health status and gender) to adopt risk management strategies (with desired features) if shown to be appropriate and effective. While acute signs and symptoms of air pollution exposure are indicated with bicycle commuting, and more so in susceptible individuals, there is willingness to manage exposure risk by adopting effective strategies with desired features.

  7. Risk managers, physicians, and disclosure of harmful medical errors.

    PubMed

    Loren, David J; Garbutt, Jane; Dunagan, W Claiborne; Bommarito, Kerry M; Ebers, Alison G; Levinson, Wendy; Waterman, Amy D; Fraser, Victoria J; Summy, Elizabeth A; Gallagher, Thomas H

    2010-03-01

    Physicians are encouraged to disclose medical errors to patients, which often requires close collaboration between physicians and risk managers. An anonymous national survey of 2,988 healthcare facility-based risk managers was conducted between November 2004 and March 2005, and results were compared with those of a previous survey (conducted between July 2003 and March 2004) of 1,311 medical physicians in Washington and Missouri. Both surveys included an error-disclosure scenario for an obvious and a less obvious error with scripted response options. More risk managers than physicians were aware that an error-reporting system was present at their hospital (81% versus 39%, p < .001) and believed that mechanisms to inform physicians about errors in their hospital were adequate (51% versus 17%, p < .001). More risk managers than physicians strongly agreed that serious errors should be disclosed to patients (70% versus 49%, p < .001). Across both error scenario, risk managers were more likely than physicians to definitely recommend that the error be disclosed (76% versus 50%, p < .001) and to provide full details about how the error would be prevented in the future (62% versus 51%, p < .001). However, physicians were more likely than risk managers to provide a full apology recognizing the harm caused by the error (39% versus 21%, p < .001). Risk managers have more favorable attitudes about disclosing errors to patients compared with physicians but are less supportive of providing a full apology. These differences may create conflicts between risk managers and physicians regarding disclosure. Health care institutions should promote greater collaboration between these two key participants in disclosure conversations.

  8. Meteorological risks as drivers of innovation for agroecosystem management

    NASA Astrophysics Data System (ADS)

    Gobin, Anne; Van de Vyver, Hans; Zamani, Sepideh; Curnel, Yannick; Planchon, Viviane; Verspecht, Ann; Van Huylenbroeck, Guido

    2015-04-01

    Devastating weather-related events recorded in recent years have captured the interest of the general public in Belgium. The MERINOVA project research hypothesis is that meteorological risks act as drivers of environmental innovation in agro-ecosystem management which is being tested using a "chain of risk" approach. The major objectives are to (1) assess the probability of extreme meteorological events by means of probability density functions; (2) analyse the extreme events impact of on agro-ecosystems using process-based bio-physical modelling methods; (3) identify the most vulnerable agro-ecosystems using fuzzy multi-criteria and spatial analysis; (4) uncover innovative risk management and adaptation options using actor-network theory and economic modelling; and, (5) communicate to research, policy and practitioner communities using web-based techniques. Generalized Extreme Value (GEV) theory was used to model annual rainfall maxima based on location-, scale- and shape-parameters that determine the centre of the distribution, the deviation of the location-parameter and the upper tail decay, respectively. Likewise the distributions of consecutive rainy days, rainfall deficits and extreme 24-hour rainfall were modelled. Spatial interpolation of GEV-derived return levels resulted in maps of extreme precipitation, precipitation deficits and wet periods. The degree of temporal overlap between extreme weather conditions and sensitive periods in the agro-ecosystem was determined using a bio-physically based modelling framework that couples phenological models, a soil water balance, crop growth and environmental models. 20-year return values were derived for frost, heat stress, drought, waterlogging and field access during different sensitive stages for different arable crops. Extreme yield values were detected from detrended long term arable yields and relationships were found with soil moisture conditions, heat stress or other meteorological variables during the

  9. Tacking Flood Risk from Watersheds using a Natural Flood Risk Management Toolkit

    NASA Astrophysics Data System (ADS)

    Reaney, S. M.; Pearson, C.; Barber, N.; Fraser, A.

    2017-12-01

    In the UK, flood risk management is moving beyond solely mitigating at the point of impact in towns and key infrastructure to tackle problem at source through a range of landscape based intervention measures. This natural flood risk management (NFM) approach has been trailed within a range of catchments in the UK and is moving towards being adopted as a key part of flood risk management. The approach offers advantages including lower cost and co-benefits for water quality and habitat creation. However, for an agency or group wishing to implement NFM within a catchment, there are two key questions that need to be addressed: Where in the catchment to place the measures? And how many measures are needed to be effective? With this toolkit, these questions are assessed with a two-stage workflow. First, SCIMAP-Flood gives a risk based mapping of likely locations that contribute to the flood peak. This tool uses information on land cover, hydrological connectivity, flood generating rainfall patterns and hydrological travel time distributions to impacted communities. The presented example applies the tool to the River Eden catchment, UK, with 5m grid resolution and hence provide sub-field scale information at the landscape extent. SCIMAP-Flood identifies sub-catchments where physically based catchment hydrological simulation models can be applied to test different NFM based mitigation measures. In this example, the CRUM3 catchment hydrological model has been applied within an uncertainty framework to consider the effectiveness of soil compaction reduction and large woody debris dams within a sub-catchment. It was found that large scale soil aeration to reduce soil compaction levels throughout the catchment is probably the most useful natural flood management measure for this catchment. NFM has potential for wide-spread application and these tools help to ensure that the measures are correctly designed and the scheme performance can be quantitatively assessed and predicted.

  10. Identifying Home Care Clinicians’ Information Needs for Managing Fall Risks

    PubMed Central

    Alhuwail, Dari

    2016-01-01

    Summary Objectives To help manage the risk of falls in home care, this study aimed to (i) identify home care clinicians’ information needs and how they manage missing or inaccurate data, (ii) identify problems that impact effectiveness and efficiency associated with retaining, exchanging, or processing information about fall risks in existing workflows and currently adopted health information technology (IT) solutions, and (iii) offer informatics-based recommendations to improve fall risk management interventions. Methods A case study was carried out in a single not-for-profit suburban Medicare-certified home health agency with three branches. Qualitative data were collected over a six month period through observations, semi-structured interviews, and focus groups. The Framework method was used for analysis. Maximum variation sampling was adopted to recruit a diverse sample of clinicians. Results Overall, the information needs for fall risk management were categorized into physiological, care delivery, educational, social, environmental, and administrative domains. Examples include a brief fall-related patient history, weight-bearing status, medications that affect balance, availability of caregivers at home, and the influence of patients’ cultures on fall management interventions. The unavailability and inaccuracy of critical information related to fall risks can delay necessary therapeutic services aimed at reducing patients’ risk for falling and thereby jeopardizing their safety. Currently adopted IT solutions did not adequately accommodate data related to fall risk management. Conclusion The results highlight the essential information for fall risk management in home care. Home care workflows and health IT solutions must effectively and efficiently retain, exchange, and process information necessary for fall risk management. Interoperability and integration of the various health IT solutions to make data sharing accessible to all clinicians is critical

  11. 12 CFR 932.3 - Risk-based capital requirement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 7 2011-01-01 2011-01-01 false Risk-based capital requirement. 932.3 Section 932.3 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.3 Risk-based capital requirement. (a...

  12. 12 CFR 932.3 - Risk-based capital requirement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Risk-based capital requirement. 932.3 Section 932.3 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.3 Risk-based capital requirement. (a...

  13. Risk Management for Human Support Technology Development

    NASA Technical Reports Server (NTRS)

    jones, Harry

    2005-01-01

    NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.

  14. Systematic implementation of clinical risk management in a large university hospital: the impact of risk managers.

    PubMed

    Sendlhofer, Gerald; Brunner, Gernot; Tax, Christa; Falzberger, Gebhard; Smolle, Josef; Leitgeb, Karina; Kober, Brigitte; Kamolz, Lars Peter

    2015-01-01

    For health care systems in recent years, patient safety has increasingly become a priority issue. National and international strategies have been considered to attempt to overcome the most prominent hazards while patients are receiving health care. Thereby, clinical risk management (CRM) plays a dominant role in enabling the identification, analysis, and management of potential risks. CRM implementation into routine procedures within complex hospital organizations is challenging, as in the past, organizational change strategies using a top-down approach have often failed. Therefore, one of our main objectives was to educate a certain number of risk managers in facilitating CRM using a bottom-up approach. To achieve our primary purpose, five project strands were developed, and consequently followed, introducing CRM: corporate governance, risk management (RM) training, CRM process, information, and involvement. The core part of the CRM process involved the education of risk managers within each organizational unit. To account for the size of the existing organization, we assumed that a minimum of 1 % of the workforce had to be trained in RM to disseminate the continuous improvement of quality and safety. Following a roll-out plan, CRM was introduced in each unit and potential risks were identified. Alongside the changes in the corporate governance, a hospital-wide CRM process was introduced resulting in 158 trained risk managers correlating to 2.0 % of the total workforce. Currently, risk managers are present in every unit and have identified 360 operational risks. Among those, 176 risks were scored as strategic and clustered together into top risks. Effective meeting structures and opportunities to share information and knowledge were introduced. Thus far, 31 units have been externally audited in CRM. The CRM approach is unique with respect to its dimension; members of all health care professions were trained to be able to identify potential risks. A network of risk

  15. Financial risk management of pharmacy benefits.

    PubMed

    Saikami, D

    1997-10-01

    Financial risk management of pharmacy benefits in integrated health systems is explained. A managed care organization should assume financial risk for pharmacy benefits only if it can manage the risk. Horizontally integrated organizations often do not have much control over the management of drug utilization and costs. Vertically integrated organizations have the greatest ability to manage pharmacy financial risk; virtual integration may also be compatible. Contracts can be established in which the provider is incentivized or placed at partial or full risk. The main concerns that health plans have with respect to pharmacy capitation are formulary management and the question of who should receive rebates from manufacturers. The components needed to managed pharmacy financial risk depend on the type of contract negotiated. Health-system pharmacists are uniquely positioned to take advantage of opportunities opening up through pharmacy risk contracting. Functions most organizations must provide when assuming pharmacy financial risk can be divided into internal and external categories. Internally performed functions include formulary management, clinical pharmacy services and utilization management, and utilization reports for physicians. Functions that can be outsourced include claims processing and administration, provider- and customer support services, and rebates. Organizations that integrate the pharmacy benefit across the health care continuum will be more effective in controlling costs and improving outcomes than organizations that handle this benefit as separate from others. Patient care should not focus on payment mechanisms and unit costs but on developing superior processes and systems that improve health care.

  16. Assessing surface water flood risk and management strategies under future climate change: Insights from an Agent-Based Model.

    PubMed

    Jenkins, K; Surminski, S; Hall, J; Crick, F

    2017-10-01

    Climate change and increasing urbanization are projected to result in an increase in surface water flooding and consequential damages in the future. In this paper, we present insights from a novel Agent Based Model (ABM), applied to a London case study of surface water flood risk, designed to assess the interplay between different adaptation options; how risk reduction could be achieved by homeowners and government; and the role of flood insurance and the new flood insurance pool, Flood Re, in the context of climate change. The analysis highlights that while combined investment in property-level flood protection and sustainable urban drainage systems reduce surface water flood risk, the benefits can be outweighed by continued development in high risk areas and the effects of climate change. In our simulations, Flood Re is beneficial in its function to provide affordable insurance, even under climate change. However, the scheme does face increasing financial pressure due to rising surface water flood damages. If the intended transition to risk-based pricing is to take place then a determined and coordinated strategy will be needed to manage flood risk, which utilises insurance incentives, limits new development, and supports resilience measures. Our modelling approach and findings are highly relevant for the ongoing regulatory and political approval process for Flood Re as well as for wider discussions on the potential of insurance schemes to incentivise flood risk management and climate adaptation in the UK and internationally. Copyright © 2017 Elsevier B.V. All rights reserved.

  17. A Risk-Analysis Approach to Implementing Web-Based Assessment

    ERIC Educational Resources Information Center

    Ricketts, Chris; Zakrzewski, Stan

    2005-01-01

    Computer-Based Assessment is a risky business. This paper proposes the use of a model for web-based assessment systems that identifies pedagogic, operational, technical (non web-based), web-based and financial risks. The strategies and procedures for risk elimination or reduction arise from risk analysis and management and are the means by which…

  18. Risk Management: A Leader's Responsibility.

    ERIC Educational Resources Information Center

    Rowe, Roger E.

    1997-01-01

    Discusses what facilities management leaders can do to ensure the safety of students and employees. Focuses on six specific tasks, such as detecting hazards and assessing the risks, and offers three rules underlying the application of risk management, including do not accept unnecessary risk. Provides an outline of prevention responsibilities.…

  19. Aligning population-based care management with chronic disease complexity.

    PubMed

    Hewner, Sharon; Seo, Jin Young; Gothard, Sandra E; Johnson, Barbara J

    2014-01-01

    Risk-stratified care management requires knowledge of the complexity of chronic disease and comorbidity, information that is often not readily available in the primary care setting. The purpose of this article was to describe a population-based approach to risk-stratified care management that could be applied in primary care. Three populations (Medicaid, Medicare, and privately insured) at a regional health plan were divided into risk-stratified cohorts based on chronic disease and complexity, and utilization was compared before and after the implementation of population-specific care management teams of nurses. Risk-stratified care management was associated with reductions in hospitalization rates in all three populations, but the opportunities to avoid admissions were different. Knowledge of population complexity is critical to the development of risk-stratified care management in primary care, and a complexity matrix can help nurses identify gaps in care and align interventions to cohort and population needs. Copyright © 2014 Elsevier Inc. All rights reserved.

  20. Perspectives: Intellectual Risk Management

    ERIC Educational Resources Information Center

    Hall, James C.

    2013-01-01

    Ask a college administrator about students and risk management, and you're likely to get a quick and agitated speech about alcohol consumption and bad behavior or a meditation on mental health and campus safety. But in colleges and universities, we manage intellectual risk-taking too. Bring that up, and you'll probably get little out of that same…

  1. 17 CFR 39.13 - Risk management.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 17 Commodity and Securities Exchanges 1 2014-04-01 2014-04-01 false Risk management. 39.13 Section... ORGANIZATIONS Compliance with Core Principles § 39.13 Risk management. (a) General. A derivatives clearing..., procedures, and controls, approved by its board of directors, which establish an appropriate risk management...

  2. 17 CFR 39.13 - Risk management.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 17 Commodity and Securities Exchanges 1 2013-04-01 2013-04-01 false Risk management. 39.13 Section... ORGANIZATIONS Compliance with Core Principles § 39.13 Risk management. (a) General. A derivatives clearing..., procedures, and controls, approved by its board of directors, which establish an appropriate risk management...

  3. 17 CFR 39.13 - Risk management.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 17 Commodity and Securities Exchanges 1 2012-04-01 2012-04-01 false Risk management. 39.13 Section... ORGANIZATIONS Compliance with Core Principles § 39.13 Risk management. (a) General. A derivatives clearing..., procedures, and controls, approved by its board of directors, which establish an appropriate risk management...

  4. Managing loss adjustment expenses: strategies for health care risk managers.

    PubMed

    Quinley, K M

    1991-01-01

    Like most businesses, adjusting companies are not charitable organizations. They are entitled to a reasonable profit, which the risk manager should not begrudge. As a buyer of adjusting services, a risk manager with an inordinate obsession with slashing adjusting bills can destroy the goal of high-quality service. It is best for risk managers to pick and choose the areas for cutting adjusting expenses. To an extent, health care risk managers should view payment of high-quality adjusting services as an investment, with the payback being money saved by fighting fraudulent, exaggerated, and questionable claims.

  5. Managing Disease Risks from Trade: Strategic Behavior with Many Choices and Price Effects.

    PubMed

    Chitchumnong, Piyayut; Horan, Richard D

    2018-03-16

    An individual's infectious disease risks, and hence the individual's incentives for risk mitigation, may be influenced by others' risk management choices. If so, then there will be strategic interactions among individuals, whereby each makes his or her own risk management decisions based, at least in part, on the expected decisions of others. Prior work has shown that multiple equilibria could arise in this setting, with one equilibrium being a coordination failure in which individuals make too few investments in protection. However, these results are largely based on simplified models involving a single management choice and fixed prices that may influence risk management incentives. Relaxing these assumptions, we find strategic interactions influence, and are influenced by, choices involving multiple management options and market price effects. In particular, we find these features can reduce or eliminate concerns about multiple equilibria and coordination failure. This has important policy implications relative to simpler models.

  6. [Economic evaluation and rationale for human health risk management decisions].

    PubMed

    Fokin, S G; Bobkova, T E

    2011-01-01

    The priority task of human health maintenance and improvement is risk management using the new economic concepts based on the assessment of potential and real human risks from exposure to poor environmental factors and on the estimation of cost-benefit and cost-effectiveness ratios. The application of economic tools to manage a human risk makes it possible to assess various measures both as a whole and their individual priority areas, to rank different scenarios in terms of their effectiveness, to estimate costs per unit of risk reduction and benefit increase (damage decrease).

  7. Assessing and managing multiple risks in a changing world-The Roskilde recommendations.

    PubMed

    Selck, Henriette; Adamsen, Peter B; Backhaus, Thomas; Banta, Gary T; Bruce, Peter K H; Burton, G Allen; Butts, Michael B; Boegh, Eva; Clague, John J; Dinh, Khuong V; Doorn, Neelke; Gunnarsson, Jonas S; Hauggaard-Nielsen, Henrik; Hazlerigg, Charles; Hunka, Agnieszka D; Jensen, John; Lin, Yan; Loureiro, Susana; Miraglia, Simona; Munns, Wayne R; Nadim, Farrokh; Palmqvist, Annemette; Rämö, Robert A; Seaby, Lauren P; Syberg, Kristian; Tangaa, Stine R; Thit, Amalie; Windfeld, Ronja; Zalewski, Maciej; Chapman, Peter M

    2017-01-01

    Roskilde University (Denmark) hosted a November 2015 workshop, Environmental Risk-Assessing and Managing Multiple Risks in a Changing World. This Focus article presents the consensus recommendations of 30 attendees from 9 countries regarding implementation of a common currency (ecosystem services) for holistic environmental risk assessment and management; improvements to risk assessment and management in a complex, human-modified, and changing world; appropriate development of protection goals in a 2-stage process; dealing with societal issues; risk-management information needs; conducting risk assessment of risk management; and development of adaptive and flexible regulatory systems. The authors encourage both cross-disciplinary and interdisciplinary approaches to address their 10 recommendations: 1) adopt ecosystem services as a common currency for risk assessment and management; 2) consider cumulative stressors (chemical and nonchemical) and determine which dominate to best manage and restore ecosystem services; 3) fully integrate risk managers and communities of interest into the risk-assessment process; 4) fully integrate risk assessors and communities of interest into the risk-management process; 5) consider socioeconomics and increased transparency in both risk assessment and risk management; 6) recognize the ethical rights of humans and ecosystems to an adequate level of protection; 7) determine relevant reference conditions and the proper ecological context for assessments in human-modified systems; 8) assess risks and benefits to humans and the ecosystem and consider unintended consequences of management actions; 9) avoid excessive conservatism or possible underprotection resulting from sole reliance on binary, numerical benchmarks; and 10) develop adaptive risk-management and regulatory goals based on ranges of uncertainty. Environ Toxicol Chem 2017;36:7-16. © 2016 SETAC. © 2016 SETAC.

  8. The future of monitoring in clinical research - a holistic approach: linking risk-based monitoring with quality management principles.

    PubMed

    Ansmann, Eva B; Hecht, Arthur; Henn, Doris K; Leptien, Sabine; Stelzer, Hans Günther

    2013-01-01

    Since several years risk-based monitoring is the new "magic bullet" for improvement in clinical research. Lots of authors in clinical research ranging from industry and academia to authorities are keen on demonstrating better monitoring-efficiency by reducing monitoring visits, monitoring time on site, monitoring costs and so on, always arguing with the use of risk-based monitoring principles. Mostly forgotten is the fact, that the use of risk-based monitoring is only adequate if all mandatory prerequisites at site and for the monitor and the sponsor are fulfilled.Based on the relevant chapter in ICH GCP (International Conference on Harmonisation of technical requirements for registration of pharmaceuticals for human use - Good Clinical Practice) this publication takes a holistic approach by identifying and describing the requirements for future monitoring and the use of risk-based monitoring. As the authors are operational managers as well as QA (Quality Assurance) experts, both aspects are represented to come up with efficient and qualitative ways of future monitoring according to ICH GCP.

  9. AHP for Risk Management Based on Expected Utility Theory

    NASA Astrophysics Data System (ADS)

    Azuma, Rumiko; Miyagi, Hayao

    This paper presents a model of decision-making considering the risk assessment. The conventional evaluation in AHP is considered to be a kind of utility. When dealing with the risk, however, it is necessary to consider the probability of damage. In order to take risk into decision-making problem, we construct AHP based on expected utility. The risk is considered as a related element of criterion rather than criterion itself. The expected utility is integrated, considering that satisfaction is positive utility and damage by risk is negative utility. Then, evaluation in AHP is executed using the expected utility.

  10. RISK COMMUNICATION AS A RISK MANAGEMENT TOOL: A RISK COMMUNICATION WORKBOOK

    EPA Science Inventory

    Communicating information about environmental risk to the people most affected by it is one of the major challenges faced by risk managers and community decision makers. Changing human behavior is a far more complex task than designing water retention systems or managing storm wa...

  11. IT Operational Risk Measurement Model Based on Internal Loss Data of Banks

    NASA Astrophysics Data System (ADS)

    Hao, Xiaoling

    Business operation of banks relies increasingly on information technology (IT) and the most important role of IT is to guarantee the operational continuity of business process. Therefore, IT Risk management efforts need to be seen from the perspective of operational continuity. Traditional IT risk studies focused on IT asset-based risk analysis and risk-matrix based qualitative risk evaluation. In practice, IT risk management practices of banking industry are still limited to the IT department and aren't integrated into business risk management, which causes the two departments to work in isolation. This paper presents an improved methodology for dealing with IT operational risk. It adopts quantitative measurement method, based on the internal business loss data about IT events, and uses Monte Carlo simulation to predict the potential losses. We establish the correlation between the IT resources and business processes to make sure risk management of IT and business can work synergistically.

  12. Spatio-temporal population estimates for risk management

    NASA Astrophysics Data System (ADS)

    Cockings, Samantha; Martin, David; Smith, Alan; Martin, Rebecca

    2013-04-01

    Accurate estimation of population at risk from hazards and effective emergency management of events require not just appropriate spatio-temporal modelling of hazards but also of population. While much recent effort has been focused on improving the modelling and predictions of hazards (both natural and anthropogenic), there has been little parallel advance in the measurement or modelling of population statistics. Different hazard types occur over diverse temporal cycles, are of varying duration and differ significantly in their spatial extent. Even events of the same hazard type, such as flood events, vary markedly in their spatial and temporal characteristics. Conceptually and pragmatically then, population estimates should also be available for similarly varying spatio-temporal scales. Routine population statistics derived from traditional censuses or surveys are usually static representations in both space and time, recording people at their place of usual residence on census/survey night and presenting data for administratively defined areas. Such representations effectively fix the scale of population estimates in both space and time, which is unhelpful for meaningful risk management. Over recent years, the Pop24/7 programme of research, based at the University of Southampton (UK), has developed a framework for spatio-temporal modelling of population, based on gridded population surfaces. Based on a data model which is fully flexible in terms of space and time, the framework allows population estimates to be produced for any time slice relevant to the data contained in the model. It is based around a set of origin and destination centroids, which have capacities, spatial extents and catchment areas, all of which can vary temporally, such as by time of day, day of week, season. A background layer, containing information on features such as transport networks and landuse, provides information on the likelihood of people being in certain places at specific times

  13. Business resilience: Reframing healthcare risk management.

    PubMed

    Simeone, Cynthia L

    2015-09-01

    The responsibility of risk management in healthcare is fractured, with multiple stakeholders. Most hospitals and healthcare systems do not have a fully integrated risk management system that spans the entire organizational and operational structure for the delivery of key services. This article provides insight toward utilizing a comprehensive Business Resilience program and associated methodology to understand and manage organizational risk leading to organizational effectiveness and operational efficiencies, with the fringe benefit of realizing sustainable operational capability during adverse conditions. © 2015 American Society for Healthcare Risk Management of the American Hospital Association.

  14. Investigating the potential to reduce flood risk through catchment-based land management techniques and interventions in the River Roe catchment, Cumbria,UK

    NASA Astrophysics Data System (ADS)

    Pearson, Callum; Reaney, Sim; Bracken, Louise; Butler, Lucy

    2015-04-01

    Throughout the United Kingdom flood risk is a growing problem and a significant proportion of the population are at risk from flooding throughout the country. Across England and Wales over 5 million people are believed to be at risk from fluvial, pluvial or coastal flooding (DEFRA, 2013). Increasingly communities that have not dealt with flooding before have recently experienced significant flood events. The communities of Stockdalewath and Highbridge in the Roe catchment, a tributary of the River Eden in Cumbria, UK, are an excellent example. The River Roe has a normal flow of less than 5m3 sec-1 occurring 97 percent of the time however there have been two flash floods of 98.8m3 sec-1 in January 2005 and 86.9m3 sec-1 in May 2013. These two flash flood events resulted in the inundation of numerous properties within the catchment with the 2013 event prompting the creation of the Roe Catchment Community Water Management Group which aims are to deliver a sustainable approach to managing the flood risk. Due to the distributed rural population the community fails the cost-benefit analysis for a centrally funded flood risk mitigation scheme. Therefore the at-risk community within the Roe catchment have to look for cost-effective, sustainable techniques and interventions to reduce the potential negative impacts of future events; this has resulted in a focus on natural flood risk management. This research investigates the potential to reduce flood risk through natural catchment-based land management techniques and interventions within the Roe catchment; providing a scientific base from with further action can be enacted. These interventions include changes to land management and land use, such as soil aeration and targeted afforestation, the creation of runoff attenuation features and the construction of in channel features, such as debris dams. Natural flood management (NFM) application has been proven to be effective when reducing flood risk in smaller catchments and the

  15. Fixing responsibility for risk management.

    PubMed

    Maniccia, M D

    2000-01-01

    The responsibility for carrying financial risk for medical coverage has migrated from individuals to insurers to employers to providers, without finding a satisfactory home. Each shift further complicates the health care infrastructure, as other responsibilities in the management of benefits and provision of care gravitate to the stakeholder who accepts risk. The social imperative to broaden coverage is forcing a change in the mechanisms of risk management--from avoiding high-risk patients, to managing those patients to better outcomes. In this paper we seek to identify objectively the most appropriate party to carry the financial risk of medical coverage, consider what characteristics are necessary to make that a practical and enduring solution, and examine the secondary effects of the structure required to support that solution.

  16. Managing Risk Assessment in Science Departments.

    ERIC Educational Resources Information Center

    Forlin, Peter; Forlin, Chris

    1997-01-01

    Describes a health-and-safety risk-management audit in four Queensland, Australia high schools. One major outcome of this research project is the development of a comprehensive risk-management policy in compliance with the law. Other outcomes include the preparation of a professional-development package in risk-management policy for use as a…

  17. 12 CFR 932.1 - Risk management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 Banks and Banking 8 2013-01-01 2013-01-01 false Risk management. 932.1 Section 932.1 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.1 Risk management. Before its new capital plan may take...

  18. 12 CFR 932.1 - Risk management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 7 2011-01-01 2011-01-01 false Risk management. 932.1 Section 932.1 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.1 Risk management. Before its new capital plan may take...

  19. 12 CFR 932.1 - Risk management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 Banks and Banking 8 2012-01-01 2012-01-01 false Risk management. 932.1 Section 932.1 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.1 Risk management. Before its new capital plan may take...

  20. 12 CFR 932.1 - Risk management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Risk management. 932.1 Section 932.1 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.1 Risk management. Before its new capital plan may take...

  1. The quality assurance-risk management interface.

    PubMed

    Little, N

    1992-08-01

    Involvement with both risk management and quality assurance programs has led many authors to the conclusion that the fundamental differences between these activities are, in fact, very small. "At the point of overlap, it is almost impossible to distinguish the purposes and methods of both functions from one another." "Good risk management includes real improvement in patient care through organized quality assurance activities." The interface between a proactive risk management program and a quality assurance program is dynamic and can serve the legitimate interests of both. There is little to be gained by thinking of them as separate entities and much to be gained by sharing the lessons of both. If one thinks of risk management in terms of "risk" to quality patient care, and that "assuring quality" is the most productive type of risk management, then there is no practical reason to separate one from the other.

  2. Passive sampling methods for contaminated sediments: Risk assessment and management

    PubMed Central

    Greenberg, Marc S; Chapman, Peter M; Allan, Ian J; Anderson, Kim A; Apitz, Sabine E; Beegan, Chris; Bridges, Todd S; Brown, Steve S; Cargill, John G; McCulloch, Megan C; Menzie, Charles A; Shine, James P; Parkerton, Thomas F

    2014-01-01

    This paper details how activity-based passive sampling methods (PSMs), which provide information on bioavailability in terms of freely dissolved contaminant concentrations (Cfree), can be used to better inform risk management decision making at multiple points in the process of assessing and managing contaminated sediment sites. PSMs can increase certainty in site investigation and management, because Cfree is a better predictor of bioavailability than total bulk sediment concentration (Ctotal) for 4 key endpoints included in conceptual site models (benthic organism toxicity, bioaccumulation, sediment flux, and water column exposures). The use of passive sampling devices (PSDs) presents challenges with respect to representative sampling for estimating average concentrations and other metrics relevant for exposure and risk assessment. These challenges can be addressed by designing studies that account for sources of variation associated with PSMs and considering appropriate spatial scales to meet study objectives. Possible applications of PSMs include: quantifying spatial and temporal trends in bioavailable contaminants, identifying and evaluating contaminant source contributions, calibrating site-specific models, and, improving weight-of-evidence based decision frameworks. PSM data can be used to assist in delineating sediment management zones based on likelihood of exposure effects, monitor remedy effectiveness, and, evaluate risk reduction after sediment treatment, disposal, or beneficial reuse after management actions. Examples are provided illustrating why PSMs and freely dissolved contaminant concentrations (Cfree) should be incorporated into contaminated sediment investigations and study designs to better focus on and understand contaminant bioavailability, more accurately estimate exposure to sediment-associated contaminants, and better inform risk management decisions. Research and communication needs for encouraging broader use are discussed. Integr

  3. Fews-Risk: A step towards risk-based flood forecasting

    NASA Astrophysics Data System (ADS)

    Bachmann, Daniel; Eilander, Dirk; de Leeuw, Annemargreet; Diermanse, Ferdinand; Weerts, Albrecht; de Bruijn, Karin; Beckers, Joost; Boelee, Leonore; Brown, Emma; Hazlewood, Caroline

    2015-04-01

    Operational flood prediction and the assessment of flood risk are important components of flood management. Currently, the model-based prediction of discharge and/or water level in a river is common practice for operational flood forecasting. Based on the prediction of these values decisions about specific emergency measures are made within operational flood management. However, the information provided for decision support is restricted to pure hydrological or hydraulic aspects of a flood. Information about weak sections within the flood defences, flood prone areas and assets at risk in the protected areas are rarely used in a model-based flood forecasting system. This information is often available for strategic planning, but is not in an appropriate format for operational purposes. The idea of FEWS-Risk is the extension of existing flood forecasting systems with elements of strategic flood risk analysis, such as probabilistic failure analysis, two dimensional flood spreading simulation and the analysis of flood impacts and consequences. Thus, additional information is provided to the decision makers, such as: • Location, timing and probability of failure of defined sections of the flood defence line; • Flood spreading, extent and hydraulic values in the hinterland caused by an overflow or a breach flow • Impacts and consequences in case of flooding in the protected areas, such as injuries or casualties and/or damages to critical infrastructure or economy. In contrast with purely hydraulic-based operational information, these additional data focus upon decision support for answering crucial questions within an operational flood forecasting framework, such as: • Where should I reinforce my flood defence system? • What type of action can I take to mend a weak spot in my flood defences? • What are the consequences of a breach? • Which areas should I evacuate first? This presentation outlines the additional required workflows towards risk-based flood

  4. Risk-Based Approach for Microbiological Food Safety Management in the Dairy Industry: The Case of Listeria monocytogenes in Soft Cheese Made from Pasteurized Milk.

    PubMed

    Tenenhaus-Aziza, Fanny; Daudin, Jean-Jacques; Maffre, Alexandre; Sanaa, Moez

    2014-01-01

    According to Codex Alimentarius Commission recommendations, management options applied at the process production level should be based on good hygiene practices, HACCP system, and new risk management metrics such as the food safety objective. To follow this last recommendation, the use of quantitative microbiological risk assessment is an appealing approach to link new risk-based metrics to management options that may be applied by food operators. Through a specific case study, Listeria monocytogenes in soft cheese made from pasteurized milk, the objective of the present article is to practically show how quantitative risk assessment could be used to direct potential intervention strategies at different food processing steps. Based on many assumptions, the model developed estimates the risk of listeriosis at the moment of consumption taking into account the entire manufacturing process and potential sources of contamination. From pasteurization to consumption, the amplification of a primo-contamination event of the milk, the fresh cheese or the process environment is simulated, over time, space, and between products, accounting for the impact of management options, such as hygienic operations and sampling plans. A sensitivity analysis of the model will help orientating data to be collected prioritarily for the improvement and the validation of the model. What-if scenarios were simulated and allowed for the identification of major parameters contributing to the risk of listeriosis and the optimization of preventive and corrective measures. © 2013 Society for Risk Analysis.

  5. Managing risks and hazardous in industrial operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Almaula, S.C.

    1996-12-31

    The main objective of this paper is to demonstrate that it makes good business sense to identify risks and hazards of an operation and take appropriate steps to manage them effectively. Developing and implementing an effective risk and hazard management plan also contibutes to other industry requirements and standards. Development of a risk management system, key elements of a risk management plan, and hazards and risk analysis methods are outlined. Comparing potential risk to the cost of prevention is also discussed. It is estimated that the cost of developing and preparing the first risk management plan varies between $50,000 tomore » $200,000. 3 refs., 2 figs., 1 tab.« less

  6. Bayesian Framework for Water Quality Model Uncertainty Estimation and Risk Management

    EPA Science Inventory

    A formal Bayesian methodology is presented for integrated model calibration and risk-based water quality management using Bayesian Monte Carlo simulation and maximum likelihood estimation (BMCML). The primary focus is on lucid integration of model calibration with risk-based wat...

  7. [Does clinical risk management require a structured conflict management?].

    PubMed

    Neumann, Stefan

    2015-01-01

    A key element of clinical risk management is the analysis of errors causing near misses or patient damage. After analyzing the causes and circumstances, measures for process improvement have to be taken. Process management, human resource development and other established methods are used. If an interpersonal conflict is a contributory factor to the error, there is usually no structured conflict management available which includes selection criteria for various methods of conflict processing. The European University Viadrina in Frankfurt (Oder) has created a process model for introducing a structured conflict management system which is suitable for hospitals and could fill the gap in the methodological spectrum of clinical risk management. There is initial evidence that a structured conflict management reduces staff fluctuation and hidden conflict costs. This article should be understood as an impulse for discussion on to what extent the range of methods of clinical risk management should be complemented by conflict management.

  8. A clinical economics workstation for risk-adjusted health care cost management.

    PubMed Central

    Eisenstein, E. L.; Hales, J. W.

    1995-01-01

    This paper describes a healthcare cost accounting system which is under development at Duke University Medical Center. Our approach differs from current practice in that this system will dynamically adjust its resource usage estimates to compensate for variations in patient risk levels. This adjustment is made possible by introducing a new cost accounting concept, Risk-Adjusted Quantity (RQ). RQ divides case-level resource usage variances into their risk-based component (resource consumption differences attributable to differences in patient risk levels) and their non-risk-based component (resource consumption differences which cannot be attributed to differences in patient risk levels). Because patient risk level is a factor in estimating resource usage, this system is able to simultaneously address the financial and quality dimensions of case cost management. In effect, cost-effectiveness analysis is incorporated into health care cost management. PMID:8563361

  9. Effective Management Techniques in Tertiary Administration: A Risk Management Framework.

    ERIC Educational Resources Information Center

    McNamara, R. P.; Booth, P.

    1984-01-01

    A management strategy that is potentially more fruitful for the nonprofit sector than traditional management toward a primary objective is a risk management approach to organizational effectiveness. The organization's effectiveness, its survival, can be analyzed by categorizing the risks facing it and assessing its performance in managing these…

  10. Meteorological risks are drivers of environmental innovation in agro-ecosystem management

    NASA Astrophysics Data System (ADS)

    Gobin, Anne; Van de Vijver, Hans; Vanwindekens, Frédéric; de Frutos Cachorro, Julia; Verspecht, Ann; Planchon, Viviane; Buyse, Jeroen

    2017-04-01

    Agricultural crop production is to a great extent determined by weather conditions. The research hypothesis is that meteorological risks act as drivers of environmental innovation in agro-ecosystem management. The methodology comprised five major parts: the hazard, its impact on different agro-ecosystems, vulnerability, risk management and risk communication. Generalized Extreme Value (GEV) theory was used to model annual maxima of meteorological variables based on a location-, scale- and shape-parameter that determine the center of the distribution, the deviation of the location-parameter and the upper tail decay, respectively. Spatial interpolation of GEV-derived return levels resulted in spatial temperature extremes, precipitation deficits and wet periods. The temporal overlap between extreme weather conditions and sensitive periods in the agro-ecosystem was realised using a bio-physically based modelling framework that couples phenology, a soil water balance and crop growth. 20-year return values for drought and waterlogging during different crop stages were related to arable yields. The method helped quantify agricultural production risks and rate both weather and crop-based agricultural insurance. The spatial extent of vulnerability is developed on different layers of geo-information to include meteorology, soil-landscapes, crop cover and management. Vulnerability of agroecosystems was mapped based on rules set by experts' knowledge and implemented by Fuzzy Inference System modelling and Geographical Information System tools. The approach was applied for cropland vulnerability to heavy rain and grassland vulnerability to drought. The level of vulnerability and resilience of an agro-ecosystem was also determined by risk management which differed across sectors and farm types. A calibrated agro-economic model demonstrated a marked influence of climate adapted land allocation and crop management on individual utility. The "chain of risk" approach allowed for

  11. Quality Risk Management: Putting GMP Controls First.

    PubMed

    O'Donnell, Kevin; Greene, Anne; Zwitkovits, Michael; Calnan, Nuala

    2012-01-01

    This paper presents a practical way in which current approaches to quality risk management (QRM) may be improved, such that they better support qualification, validation programs, and change control proposals at manufacturing sites. The paper is focused on the treatment of good manufacturing practice (GMP) controls during QRM exercises. It specifically addresses why it is important to evaluate and classify such controls in terms of how they affect the severity, probability of occurrence, and detection ratings that may be assigned to potential failure modes or negative events. It also presents a QRM process that is designed to directly link the outputs of risk assessments and risk control activities with qualification and validation protocols in the GMP environment. This paper concerns the need for improvement in the use of risk-based principles and tools when working to ensure that the manufacturing processes used to produce medicines, and their related equipment, are appropriate. Manufacturing processes need to be validated (or proven) to demonstrate that they can produce a medicine of the required quality. The items of equipment used in such processes need to be qualified, in order to prove that they are fit for their intended use. Quality risk management (QRM) tools can be used to support such qualification and validation activities, but their use should be science-based and subject to as little subjectivity and uncertainty as possible. When changes are proposed to manufacturing processes, equipment, or related activities, they also need careful evaluation to ensure that any risks present are managed effectively. This paper presents a practical approach to how QRM may be improved so that it better supports qualification, validation programs, and change control proposals in a more scientific way. This improved approach is based on the treatment of what are called good manufacturing process (GMP) controls during those QRM exercises. A GMP control can be considered

  12. Imagining flood futures: risk assessment and management in practice.

    PubMed

    Lane, Stuart N; Landström, Catharina; Whatmore, Sarah J

    2011-05-13

    The mantra that policy and management should be 'evidence-based' is well established. Less so are the implications that follow from 'evidence' being predictions of the future (forecasts, scenarios, horizons) even though such futures define the actions taken today to make the future sustainable. Here, we consider the tension between 'evidence', reliable because it is observed, and predictions of the future, unobservable in conventional terms. For flood risk management in England and Wales, we show that futures are actively constituted, and so imagined, through 'suites of practices' entwining policy, management and scientific analysis. Management has to constrain analysis because of the many ways in which flood futures can be constructed, but also because of commitment to an accounting calculus, which requires risk to be expressed in monetary terms. It is grounded in numerical simulation, undertaken by scientific consultants who follow policy/management guidelines that define the futures to be considered. Historical evidence is needed to deal with process and parameter uncertainties and the futures imagined are tied to pasts experienced. Reliance on past events is a challenge for prediction, given changing probability (e.g. climate change) and consequence (e.g. development on floodplains). So, risk management allows some elements of risk analysis to become unstable (notably in relation to climate change) but forces others to remain stable (e.g. invoking regulation to prevent inappropriate floodplain development). We conclude that the assumed separation of risk assessment and management is false because the risk calculation has to be defined by management. Making this process accountable requires openness about the procedures that make flood risk analysis more (or less) reliable to those we entrust to produce and act upon them such that, unlike the 'pseudosciences', they can be put to the test of public interrogation by those who have to live with their consequences

  13. Assessment and management of risk for intimate partner violence by police officers using the Spousal Assault Risk Assessment Guide.

    PubMed

    Belfrage, Henrik; Strand, Susanne; Storey, Jennifer E; Gibas, Andrea L; Kropp, P Randall; Hart, Stephen D

    2012-02-01

    Intimate partner violence (IPV) is a crime that is present in all countries, seriously impacts victims, and demands a great deal of time and resources from the criminal justice system. The current study examined the use of the Spousal Assault Risk Assessment Guide, 2nd ed. (SARA; Kropp, Hart, Webster, & Eaves, 1995), a structured professional judgment risk assessment and management tool for IPV, by police officers in Sweden over a follow-up of 18 months. SARA risk assessments had significant predictive validity with respect to risk management recommendations made by police, as well as with recidivism as indexed by subsequent contacts with police. Risk management mediated the association between risk assessment and recidivism: High levels of intervention were associated with decreased recidivism in high risk cases, but with increased recidivism in low risk cases. The findings support the potential utility of police-based risk assessment and management of IPV, and in particular the belief that appropriately structured risk assessment and management decisions can prevent violence. (c) 2012 APA, all rights reserved.

  14. Integrated Risk Management Within NASA Programs/Projects

    NASA Technical Reports Server (NTRS)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  15. An Evidence-Based Review Literature About Risk Indicators and Management of Unknown-Origin Xerostomia

    PubMed Central

    Agha-Hosseini, Farzaneh; Moosavi, Mahdieh-Sadat

    2013-01-01

    This evidence-based article reviews risk indicators and management of unknown-origin xerostomia. Xerostomia and hyposalivation refer to different aspects of dry mouth. Xerostomia is a subjective sensation of dry mouth, whilst hyposalivation is defined as an objective assessment of reduced salivary flow rate. About 30% of the elderly (65 years and older) experience xerostomia and hyposalivation. Structural and functional factors, or both may lead to salivary gland dysfunction. The EBM literature search was conducted by using the medical literature database MEDLINE via PubMed and OvidMedline search engines. Results were limited to English language articles (1965 to present) including clinical trials (CT), randomized controlled trials (RCT), systematic reviews and review articles. Case control or cohort studies were included for the etiology. Neuropathic etiology such as localized oral alteration of thermal sensations, saliva composition change (for example higher levels of K, Cl, Ca, IgA, amylase, calcium, PTH and cortisol), lower levels of estrogen and progesterone, smaller salivary gland size, and illnesses such as lichen planus, are risk indicators for unknown-origin xerostomia. The management is palliative and preventative. Management of symptoms includes drug administration (systemic secretogogues, saliva substitutes and bile secretion-stimulator), night guard, diet and habit modifications. Other managements may be indicated to treat adverse effects. Neuropathic etiology, saliva composition change, smaller salivary gland size, and illnesses such as oral lichen planus can be suggestive causes for unknown-origin xerostomia. However, longitudinal studies will be important to elucidate the causes of unknown-origin xerostomia. PMID:25512755

  16. Application of a web-based Decision Support System in risk management

    NASA Astrophysics Data System (ADS)

    Aye, Zar Chi; Jaboyedoff, Michel; Derron, Marc-Henri

    2013-04-01

    Increasingly, risk information is widely available with the help of advanced technologies such as earth observation satellites, global positioning technologies, coupled with hazard modeling and analysis, and geographical information systems (GIS). Even though it exists, no effort will be put into action if it is not properly presented to the decision makers. These information need to be communicated clearly and show its usefulness so that people can make better informed decision. Therefore, communicating available risk information has become an important challenge and decision support systems have been one of the significant approaches which can help not only in presenting risk information to the decision makers but also in making efficient decisions while reducing human resources and time needed. In this study, the conceptual framework of an internet-based decision support system is presented to highlight its importance role in risk management framework and how it can be applied in case study areas chosen. The main purpose of the proposed system is to facilitate the available risk information in risk reduction by taking into account of the changes in climate, land use and socio-economic along with the risk scenarios. It allows the users to formulate, compare and select risk reduction scenarios (mainly for floods and landslides) through an enhanced participatory platform with diverse stakeholders' involvement in the decision making process. It is based on the three-tier (client-server) architecture which integrates web-GIS plus DSS functionalities together with cost benefit analysis and other supporting tools. Embedding web-GIS provides its end users to make better planning and informed decisions referenced to a geographical location, which is the one of the essential factors in disaster risk reduction programs. Different risk reduction measures of a specific area (local scale) will be evaluated using this web-GIS tool, available risk scenarios obtained from

  17. Overview of Risk Management for Engineered Nanomaterials

    NASA Astrophysics Data System (ADS)

    Schulte, P. A.; Geraci, C. L.; Hodson, L. L.; Zumwalde, R. D.; Kuempel, E. D.; Murashov, V.; Martinez, K. F.; Heidel, D. S.

    2013-04-01

    Occupational exposure to engineered nanomaterials (ENMs) is considered a new and challenging occurrence. Preliminary information from laboratory studies indicates that workers exposed to some kinds of ENMs could be at risk of adverse health effects. To protect the nanomaterial workforce, a precautionary risk management approach is warranted and given the newness of ENMs and emergence of nanotechnology, a naturalistic view of risk management is useful. Employers have the primary responsibility for providing a safe and healthy workplace. This is achieved by identifying and managing risks which include recognition of hazards, assessing exposures, characterizing actual risk, and implementing measures to control those risks. Following traditional risk management models for nanomaterials is challenging because of uncertainties about the nature of hazards, issues in exposure assessment, questions about appropriate control methods, and lack of occupational exposure limits (OELs) or nano-specific regulations. In the absence of OELs specific for nanomaterials, a precautionary approach has been recommended in many countries. The precautionary approach entails minimizing exposures by using engineering controls and personal protective equipment (PPE). Generally, risk management utilizes the hierarchy of controls. Ideally, risk management for nanomaterials should be part of an enterprise-wide risk management program or system and this should include both risk control and a medical surveillance program that assesses the frequency of adverse effects among groups of workers exposed to nanomaterials. In some cases, the medical surveillance could include medical screening of individual workers to detect early signs of work-related illnesses. All medical surveillance should be used to assess the effectiveness of risk management; however, medical surveillance should be considered as a second line of defense to ensure that implemented risk management practices are effective.

  18. III: Use of biomarkers as Risk Indicators in Environmental Risk Assessment of oil based discharges offshore.

    PubMed

    Sanni, Steinar; Lyng, Emily; Pampanin, Daniela M

    2017-06-01

    Offshore oil and gas activities are required not to cause adverse environmental effects, and risk based management has been established to meet environmental standards. In some risk assessment schemes, Risk Indicators (RIs) are parameters to monitor the development of risk affecting factors. RIs have not yet been established in the Environmental Risk Assessment procedures for management of oil based discharges offshore. This paper evaluates the usefulness of biomarkers as RIs, based on their properties, existing laboratory biomarker data and assessment methods. Data shows several correlations between oil concentrations and biomarker responses, and assessment principles exist that qualify biomarkers for integration into risk procedures. Different ways that these existing biomarkers and methods can be applied as RIs in a probabilistic risk assessment system when linked with whole organism responses are discussed. This can be a useful approach to integrate biomarkers into probabilistic risk assessment related to oil based discharges, representing a potential supplement to information that biomarkers already provide about environmental impact and risk related to these kind of discharges. Copyright © 2016 Elsevier Ltd. All rights reserved.

  19. Are Management-Based Regulations Effective? Evidence from State Pollution Prevention Programs

    ERIC Educational Resources Information Center

    Bennear, Lori Snyder

    2007-01-01

    This paper evaluates a recent innovation in regulating risk called management-based regulation. Traditionally, risk regulation has either specified a particular means of achieving a risk-reduction goal or specified the goal and left the means of achieving that goal up to the regulated entity. In contrast, management-based regulation neither…

  20. Software And Systems Engineering Risk Management

    DTIC Science & Technology

    2010-04-01

    RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software

  1. Evidence based management of polyps of the gall bladder: A systematic review of the risk factors of malignancy.

    PubMed

    Bhatt, Nikita R; Gillis, Amy; Smoothey, Craig O; Awan, Faisal N; Ridgway, Paul F

    2016-10-01

    There are no evidence-based guidelines to dictate when Gallbladder Polyps (GBPs) of varying sizes should be resected. To identify factors that accurately predict malignant disease in GBP; to provide an evidence-based algorithm for management. A systematic review following PRISMA guidelines was performed using terms "gallbladder polyps" AND "polypoid lesion of gallbladder", from January 1993 and September 2013. Inclusion criteria required histopathological report or follow-up of 2 years. RTI-IB tool was used for quality analysis. Correlation with GBP size and malignant potential was analysed using Euclidean distance; a logistics mixed effects model was used for assessing independent risk factors for malignancy. Fifty-three articles were included in review. Data from 21 studies was pooled for analysis. Optimum size cut-off for resection of GBPs was 10 mm. Probability of malignancy is approximately zero at size <4.15 mm. Patient age >50 years, sessile and single polyps were independent risk factors for malignancy. For polyps sized 4 mm-10 mm, a risk assessment model was formulated. This review and analysis has provided an evidence-based algorithm for the management of GBPs. Longitudinal studies are needed to better understand the behaviour of polyps <10 mm, that are not at a high risk of malignancy, but may change over time. Copyright © 2016 Royal College of Surgeons of Edinburgh (Scottish charity number SC005317) and Royal College of Surgeons in Ireland. Published by Elsevier Ltd. All rights reserved.

  2. A quality risk management model approach for cell therapy manufacturing.

    PubMed

    Lopez, Fabio; Di Bartolo, Chiara; Piazza, Tommaso; Passannanti, Antonino; Gerlach, Jörg C; Gridelli, Bruno; Triolo, Fabio

    2010-12-01

    International regulatory authorities view risk management as an essential production need for the development of innovative, somatic cell-based therapies in regenerative medicine. The available risk management guidelines, however, provide little guidance on specific risk analysis approaches and procedures applicable in clinical cell therapy manufacturing. This raises a number of problems. Cell manufacturing is a poorly automated process, prone to operator-introduced variations, and affected by heterogeneity of the processed organs/tissues and lot-dependent variability of reagent (e.g., collagenase) efficiency. In this study, the principal challenges faced in a cell-based product manufacturing context (i.e., high dependence on human intervention and absence of reference standards for acceptable risk levels) are identified and addressed, and a risk management model approach applicable to manufacturing of cells for clinical use is described for the first time. The use of the heuristic and pseudo-quantitative failure mode and effect analysis/failure mode and critical effect analysis risk analysis technique associated with direct estimation of severity, occurrence, and detection is, in this specific context, as effective as, but more efficient than, the analytic hierarchy process. Moreover, a severity/occurrence matrix and Pareto analysis can be successfully adopted to identify priority failure modes on which to act to mitigate risks. The application of this approach to clinical cell therapy manufacturing in regenerative medicine is also discussed. © 2010 Society for Risk Analysis.

  3. Toward Consensus-Based Actions that Balance Invasive Plant Management and Conservation of At-Risk Fauna

    NASA Astrophysics Data System (ADS)

    Litvaitis, John A.; Norment, Jeffrey L.; Boland, Kelly; O'Brien, Kate; Stevens, Rachel; Keirstead, Donald; Lee, Thomas; Oehler, James D.; Taylor, Jeffery M.; Bickford, Susan; Tarr, Matthew D.

    2013-12-01

    Limiting the spread of invasive plants has become a high priority among natural resource managers. Yet in some regions, invasive plants are providing important habitat components to native animals that are at risk of local or regional extirpation. In these situations, removing invasive plants may decrease short-term survival of the at-risk taxa. At the same time, there may be a reluctance to expand invaded habitats to benefit at-risk species because such actions may increase the distribution of invasive plants. Such a dilemma can result in "management paralysis," where no action is taken either to reduce invasive plants or to expand habitats for at-risk species. A pragmatic solution to this dilemma may be to develop an approach that considers site-specific circumstances. We constructed a "discussion tree" as a means of initiating conversations among various stakeholders involved with managing habitats in the northeastern USA to benefit several at-risk taxa, including New England cottontails ( Sylvilagus transitionalis). Major components of this approach include recognition that expanding some invaded habitats may be essential to prevent extirpation of at-risk species, and the effective control of invasive plants is dependent on knowledge of the status of invasives on managed lands and within the surrounding landscape. By acknowledging that management of invasive plants is a complex issue without a single solution, we may be successful in limiting their spread while still addressing critical habitat needs.

  4. Identifying and Managing Risk.

    ERIC Educational Resources Information Center

    Abraham, Janice M.

    1999-01-01

    The role of the college or university chief financial officer in institutional risk management is (1) to identify risk (physical, casualty, fiscal, business, reputational, workplace safety, legal liability, employment practices, general liability), (2) to develop a campus plan to reduce and control risk, (3) to transfer risk, and (4) to track and…

  5. Confluence and Contours: Reflexive Management of Environmental Risk

    PubMed Central

    Schubert, Iljana; Pollard, Simon; Rocks, Sophie; Black, Edgar

    2015-01-01

    Government institutions have responsibilities to distribute risk management funds meaningfully and to be accountable for their choices. We took a macro‐level sociological approach to understanding the role of government in managing environmental risks, and insights from micro‐level psychology to examine individual‐level risk‐related perceptions and beliefs. Survey data from 2,068 U.K. citizens showed that lay people's funding preferences were associated positively with beliefs about responsibility and trust, yet associations with perception varied depending on risk type. Moreover, there were risk‐specific differences in the funding preferences of the lay sample and 29 policymakers. A laboratory‐based study of 109 participants examined funding allocation in more detail through iterative presentation of expert information. Quantitative and qualitative data revealed a meso‐level framework comprising three types of decisionmakers who varied in their willingness to change funding allocation preferences following expert information: adaptors, responders, and resistors. This research highlights the relevance of integrated theoretical approaches to understanding the policy process, and the benefits of reflexive dialogue to managing environmental risks. PMID:26720858

  6. From Risk Assessment to Risk Management: Matching Interventions to Adolescent Offenders’ Strengths and Vulnerabilities

    PubMed Central

    Singh, Jay P.; Desmarais, Sarah L.; Sellers, Brian G.; Hylton, Tatiana; Tirotti, Melissa; Van Dorn, Richard A.

    2013-01-01

    Though considerable research has examined the validity of risk assessment tools in predicting adverse outcomes in justice-involved adolescents, the extent to which risk assessments are translated into risk management strategies and, importantly, the association between this link and adverse outcomes has gone largely unexamined. To address these shortcomings, the Risk-Need-Responsivity (RNR) model was used to examine associations between identified strengths and vulnerabilities, interventions, and institutional outcomes for justice-involved youth. Data were collected from risk assessments completed using the Short-Term Assessment of Risk and Treatability: Adolescent Version (START:AV) for 120 adolescent offenders (96 boys and 24 girls). Interventions and outcomes were extracted from institutional records. Mixed evidence of adherence to RNR principles was found. Accordant to the risk principle, adolescent offenders judged to have more strengths had more strength-based interventions in their service plans, though adolescent offenders with more vulnerabilities did not have more interventions targeting their vulnerabilities. With respect to the need and responsivity principles, vulnerabilities and strengths identified as particularly relevant to the individual youth's risk of adverse outcomes were addressed in the service plans about half and a quarter of the time, respectively. Greater adherence to the risk and need principles was found to predict significantly the likelihood of externalizing outcomes. Findings suggest some gaps between risk assessment and risk management and highlight the potential usefulness of strength-based approaches to intervention. PMID:25346561

  7. Wrestling with risk. Risk-management award winners find that a little effort can lead to big rewards.

    PubMed

    Hallam, K

    1998-10-26

    It can cut costs, improve care and even create a bond between caregivers and patients. In other words, a little risk management can go a long way. That's the experience of the winners in the annual risk-management awards. This year's winners are the University of Pennsylvania Health System, Philadelphia, and Phoenix-based Arizona Physicians IPA. Two other organizations won honorable mentions.

  8. The NASA Risk Management Program

    NASA Technical Reports Server (NTRS)

    Buchbinder, Benjamin

    1990-01-01

    This paper describes the NASA Risk Management Program established by the Headquarters Office of Safety and Mission Quality (MSQ). Current agency policy is outlined, risk management assistance to the field is described, and examples are given of independent risk assessments conducted by SMQ. The motivation for and the structure of the program is placed in the historical context of pre- and post-Challenger environments.

  9. The Shape of Ecosystem Management to Come: Anticipating Risks and Fostering Resilience

    PubMed Central

    Seidl, Rupert

    2014-01-01

    Global change is increasingly challenging the sustainable provisioning of ecosystem services to society. Addressing future uncertainty and risk has therefore become a central problem of ecosystem management. With risk management and resilience-based stewardship, two contrasting approaches have been proposed to address this issue. Whereas one is concentrated on anticipating and mitigating risks, the other is focused on fostering the ability to absorb perturbations and maintain desired properties. While they have hitherto been discussed largely separately in the literature, I here propose a unifying framework of anticipating risks and fostering resilience in ecosystem management. Anticipatory action is advocated when the predictability of risk is high and sufficient knowledge to address it is available. Conversely, in situations in which predictability and knowledge are limited, resilience-based measures are paramount. I conclude that, by adopting a purposeful combination of insights from risk and resilience research, we can make ecosystem services provisioning more robust to future uncertainty and change. PMID:25729079

  10. Multi-hazard risk analysis for management strategies

    NASA Astrophysics Data System (ADS)

    Kappes, M.; Keiler, M.; Bell, R.; Glade, T.

    2009-04-01

    Risk management is very often operating in a reactive way, responding to an event, instead of proactive starting with risk analysis and building up the whole process of risk evaluation, prevention, event management and regeneration. Since damage and losses from natural hazards raise continuously more and more studies, concepts (e.g. Switzerland or South Tyrol-Bolozano) and software packages (e.g. ARMAGEDOM, HAZUS or RiskScape) are developed to guide, standardize and facilitate the risk analysis. But these approaches focus on different aspects and are mostly closely adapted to the situation (legislation, organization of the administration, specific processes etc.) of the specific country or region. We propose in this study the development of a flexible methodology for multi-hazard risk analysis, identifying the stakeholders and their needs, processes and their characteristics, modeling approaches as well as incoherencies occurring by combining all these different aspects. Based on this concept a flexible software package will be established consisting of ArcGIS as central base and being complemented by various modules for hazard modeling, vulnerability assessment and risk calculation. Not all modules will be developed newly but taken from the current state-of-the-art and connected or integrated into ArcGIS. For this purpose two study sites, Valtellina in Italy and Bacelonnette in France, were chosen and the hazards types debris flows, rockfalls, landslides, avalanches and floods are planned to be included in the tool for a regional multi-hazard risk analysis. Since the central idea of this tool is its flexibility this will only be a first step, in the future further processes and scales can be included and the instrument thus adapted to any study site.

  11. Risk Management for the International Space Station

    NASA Technical Reports Server (NTRS)

    Sebastian, J.; Brezovic, Philip

    2002-01-01

    The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.

  12. Evidence-Based Guidelines for Fatigue Risk Management in EMS: Formulating Research Questions and Selecting Outcomes.

    PubMed

    Patterson, P Daniel; Higgins, J Stephen; Lang, Eddy S; Runyon, Michael S; Barger, Laura K; Studnek, Jonathan R; Moore, Charity G; Robinson, Kathy; Gainor, Dia; Infinger, Allison; Weiss, Patricia M; Sequeira, Denisse J; Martin-Gill, Christian

    2017-01-01

    Greater than half of Emergency Medical Services (EMS) personnel report work-related fatigue, yet there are no guidelines for the management of fatigue in EMS. A novel process has been established for evidence-based guideline (EBG) development germane to clinical EMS questions. This process has not yet been applied to operational EMS questions like fatigue risk management. The objective of this study was to develop content valid research questions in the Population, Intervention, Comparison, and Outcome (PICO) framework, and select outcomes to guide systematic reviews and development of EBGs for EMS fatigue risk management. We adopted the National Prehospital EBG Model Process and Grading of Recommendations Assessment, Development, and Evaluation (GRADE) framework for developing, implementing, and evaluating EBGs in the prehospital care setting. In accordance with steps one and two of the Model Process, we searched for existing EBGs, developed a multi-disciplinary expert panel and received external input. Panelists completed an iterative process to formulate research questions. We used the Content Validity Index (CVI) to score relevance and clarity of candidate PICO questions. The panel completed multiple rounds of question editing and used a CVI benchmark of ≥0.78 to indicate acceptable levels of clarity and relevance. Outcomes for each PICO question were rated from 1 = less important to 9 = critical. Panelists formulated 13 candidate PICO questions, of which 6 were eliminated or merged with other questions. Panelists reached consensus on seven PICO questions (n = 1 diagnosis and n = 6 intervention). Final CVI scores of relevance ranged from 0.81 to 1.00. Final CVI scores of clarity ranged from 0.88 to 1.00. The mean number of outcomes rated as critical, important, and less important by PICO question was 0.7 (SD 0.7), 5.4 (SD 1.4), and 3.6 (SD 1.9), respectively. Patient and personnel safety were rated as critical for most PICO questions. PICO questions and

  13. 12 CFR 704.6 - Credit risk management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Credit risk management. 704.6 Section 704.6... CREDIT UNIONS § 704.6 Credit risk management. (a) Policies. A corporate credit union must operate according to a credit risk management policy that is commensurate with the investment risks and activities...

  14. NASA's human system risk management approach and its applicability to commercial spaceflight.

    PubMed

    Law, Jennifer; Mathers, Charles H; Fondy, Susan R E; Vanderploeg, James M; Kerstman, Eric L

    2013-01-01

    As planning continues for commercial spaceflight, attention is turned to NASA to assess whether its human system risk management approach can be applied to mitigate the risks associated with commercial suborbital and orbital flights. NASA uses a variety of methods to assess the risks to the human system based on their likelihood and consequences. In this article, we review these methods and categorize the risks in the system as "definite," "possible," or "least" concern for commercial spaceflight. As with career astronauts, these risks will be primarily mitigated by screening and environmental control. Despite its focus on long-duration exploration missions, NASA's human system risk management approach can serve as a preliminary knowledge base to help medical planners prepare for commercial spaceflights.

  15. Using Risk Assessment Methodologies to Meet Management Objectives

    NASA Technical Reports Server (NTRS)

    DeMott, D. L.

    2015-01-01

    Current decision making involves numerous possible combinations of technology elements, safety and health issues, operational aspects and process considerations to satisfy program goals. Identifying potential risk considerations as part of the management decision making process provides additional tools to make more informed management decision. Adapting and using risk assessment methodologies can generate new perspectives on various risk and safety concerns that are not immediately apparent. Safety and operational risks can be identified and final decisions can balance these considerations with cost and schedule risks. Additional assessments can also show likelihood of event occurrence and event consequence to provide a more informed basis for decision making, as well as cost effective mitigation strategies. Methodologies available to perform Risk Assessments range from qualitative identification of risk potential, to detailed assessments where quantitative probabilities are calculated. Methodology used should be based on factors that include: 1) type of industry and industry standards, 2) tasks, tools, and environment 3) type and availability of data and 4) industry views and requirements regarding risk & reliability. Risk Assessments are a tool for decision makers to understand potential consequences and be in a position to reduce, mitigate or eliminate costly mistakes or catastrophic failures.

  16. Risk Management in Biologics Technology Transfer.

    PubMed

    Toso, Robert; Tsang, Jonathan; Xie, Jasmina; Hohwald, Stephen; Bain, David; Willison-Parry, Derek

    Technology transfer of biological products is a complex process that is important for product commercialization. To achieve a successful technology transfer, the risks that arise from changes throughout the project must be managed. Iterative risk analysis and mitigation tools can be used to both evaluate and reduce risk. The technology transfer stage gate model is used as an example tool to help manage risks derived from both designed process change and unplanned changes that arise due to unforeseen circumstances. The strategy of risk assessment for a change can be tailored to the type of change. In addition, a cross-functional team and centralized documentation helps maximize risk management efficiency to achieve a successful technology transfer. © PDA, Inc. 2016.

  17. Cancer risk management decision making for BRCA+ women.

    PubMed

    Leonarczyk, Terri Jabaley; Mawn, Barbara E

    2015-01-01

    Women with pathogenic BRCA genetic mutations face high risks for cancer development. Estimates vary among mutation carriers, with lifetime risks ranging from 41% to 90% for breast cancer and 8% to 62% for ovarian cancer. Cancer risk management options for BRCA mutation positive (BRCA+) women have life-altering implications. This qualitative, phenomenological study explored the experience of cancer risk management decision making for women who are unaffected carriers of a BRCA mutation (previvors). Fifteen previvors recruited from Facing Our Risk of Cancer Empowered (FORCE), an online informational and support group, were interviewed. Findings consisted of four major themes: the early previvor experience, intense emotional upheaval; the decisional journey, navigating a personal plan for survival; lack of knowledge and experience among health care providers; and support is essential. Findings highlight the different decisional perspectives of previvors based on age and individual factors and the need for increased competence among health care providers. © The Author(s) 2014.

  18. Continuous Risk Management: A NASA Program Initiative

    NASA Technical Reports Server (NTRS)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  19. Management of statin-intolerant high-risk patients.

    PubMed

    Tziomalos, Konstantinos; Athyros, Vasilios G; Karagiannis, Asterios; Mikhailidis, Dimitri P

    2010-09-01

    Statins are an essential part of the management of patients at high vascular risk and are generally well-tolerated. However, statin intolerance will be observed more frequently as more stringent low density lipoprotein cholesterol (LDL-C) targets are pursued in an ever increasing number of patients. We review the management options for high-risk patients intolerant to statin treatment. Potential strategies include switching to a different statin, reducing the frequency of statin administration, substituting statins with other LDL-C-lowering agents (e.g. ezetimibe, colesevelam or nicotinic acid) and combining low-dose statin treatment with other lipid-modifying drugs. A limited number of studies specifically assessed statin-intolerant patients and most were small and of short duration. It is therefore difficult to make evidence-based recommendations for the management of this population. In addition, all treatment options have limitations in terms of safety and/or efficacy.

  20. Demonstrating PQS Effectiveness and Driving Continual Improvement: Evidence-Based Risk Reduction.

    PubMed

    Ramnarine, Emma; O'Donnell, Kevin

    2018-04-18

    Product knowledge grows and evolves during the life of a product. In order to maintain a state of control and deliver product with consistent quality throughout its commercial life, continuous improvement and product lifecycle management become essential. The practical link between product and process knowledge, risk-based control strategies, and continual improvement and innovation can be made stronger through evidence-based risk reduction. Regulatory relief and flexibility in post approval change management and overall product lifecycle management will only be possible with effective application of science and risk-based concepts and demonstrated effectiveness of the PQS in assuring a state of control. Copyright © 2018, Parenteral Drug Association.

  1. The management of women at high risk for the development of breast cancer: risk estimation and preventative strategies.

    PubMed

    Sakorafas, George H

    2003-04-01

    Despite recent progress in the diagnostic and therapeutic approaches to the management of women with breast cancer, at least one third of these women will ultimately die from their disease. This resulted in a new focus on breast cancer prevention, especially for the woman designed as "high-risk". The continuing challenge is to identify reliable markers to accurately recognize this group of women, who are more likely to develop breast cancer. This will allow a targeted specific counseling and the application of preventative measures. Management options in high-risk women include intensive cancer surveillance, chemoprevention (mainly using tamoxifen), and prophylactic surgery (preferentially total mastectomy). Cancer surveillance is the most preferred management option. Currently, no data exists comparing prophylactic mastectomy vs. surveillance vs. chemoprevention. Thus, despite significant advances in our understanding of the biology of breast cancer, many questions remain unanswered concerning the optimal management of the high-risk woman. Patient counseling has a central role in the decision-making process and should be based on a multidisciplinary approach. The individual woman will make the final decision based on the amount of risk she is willing to accept. It is hoped that other preventative methods, such as gene therapy based on an accurate identification of specific genetic changes, will be developed in the future.

  2. Managing total corporate electricity/energy market risks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Henney, A.; Keers, G.

    1998-10-01

    The banking industry has developed a tool kit of very useful value at risk techniques for hedging risk, but these techniques must be adapted to the special complexities of the electricity market. This paper starts with a short history of the use of value-at-risk (VAR) techniques in banking risk management and then examines the specific and, in many instances, complex risk management challenges faced by electric companies from the behavior of prices in electricity markets and from the character of generation and electric retailing risks. The third section describes the main methods for making VAR calculations along with an analysismore » of their suitability for analyzing the risks of electricity portfolios and the case for using profit at risk and downside risk as measures of risk. The final section draws the threads together and explains how to look at managing total corporate electricity market risk, which is a big step toward managing total corporate energy market risk.« less

  3. Air pollution and public health: a guidance document for risk managers.

    PubMed

    Craig, Lorraine; Brook, Jeffrey R; Chiotti, Quentin; Croes, Bart; Gower, Stephanie; Hedley, Anthony; Krewski, Daniel; Krupnick, Alan; Krzyzanowski, Michal; Moran, Michael D; Pennell, William; Samet, Jonathan M; Schneider, Jurgen; Shortreed, John; Williams, Martin

    2008-01-01

    This guidance document is a reference for air quality policymakers and managers providing state-of-the-art, evidence-based information on key determinants of air quality management decisions. The document reflects the findings of five annual meetings of the NERAM (Network for Environmental Risk Assessment and Management) International Colloquium Series on Air Quality Management (2001-2006), as well as the results of supporting international research. The topics covered in the guidance document reflect critical science and policy aspects of air quality risk management including i) health effects, ii) air quality emissions, measurement and modeling, iii) air quality management interventions, and iv) clean air policy challenges and opportunities.

  4. A GIS-based multicriteria evaluation for aiding risk management Pinus pinaster Ait. forests: a case study in Corsican Island, western Mediterranean Region.

    PubMed

    Pasqualini, Vanina; Oberti, Pascal; Vigetta, Stéphanie; Riffard, Olivier; Panaïotis, Christophe; Cannac, Magali; Ferrat, Lila

    2011-07-01

    Forest management can benefit from decision support tools, including GIS-based multicriteria decision-aiding approach. In the Mediterranean region, Pinus pinaster forests play a very important role in biodiversity conservation and offer many socioeconomic benefits. However, the conservation of this species is affected by the increase in forest fires and the expansion of Matsucoccus feytaudi. This paper proposes a methodology based on commonly available data for assessing the values and risks of P. pinaster forests and to generating maps to aid in decisions pertaining to fire and phytosanitary risk management. The criteria for assessing the values (land cover type, legislative tools for biodiversity conservation, environmental tourist sites and access routes, and timber yield) and the risks (fire and phytosanitation) of P. pinaster forests were obtained directly or by considering specific indicators, and they were subsequently aggregated by means of GIS-based multicriteria analysis. This approach was tested on the island of Corsica (France), and maps to aid in decisions pertaining to fire risk and phytosanitary risk (M. feytaudi) were obtained for P. pinaster forest management. Study results are used by the technical offices of the local administration-Corsican Agricultural and Rural Development Agency (ODARC)-for planning the conservation of P. pinaster forests with regard to fire prevention and safety and phytosanitary risks. The decision maker took part in the evaluation criteria study (weight, normalization, and classification of the values). Most suitable locations are given to target the public intervention. The methodology presented in this paper could be applied to other species and in other Mediterranean regions.

  5. A GIS-Based Multicriteria Evaluation for Aiding Risk Management Pinus pinaster Ait. Forests: A Case Study in Corsican Island, Western Mediterranean Region

    NASA Astrophysics Data System (ADS)

    Pasqualini, Vanina; Oberti, Pascal; Vigetta, Stéphanie; Riffard, Olivier; Panaïotis, Christophe; Cannac, Magali; Ferrat, Lila

    2011-07-01

    Forest management can benefit from decision support tools, including GIS-based multicriteria decision-aiding approach. In the Mediterranean region, Pinus pinaster forests play a very important role in biodiversity conservation and offer many socioeconomic benefits. However, the conservation of this species is affected by the increase in forest fires and the expansion of Matsucoccus feytaudi. This paper proposes a methodology based on commonly available data for assessing the values and risks of P. pinaster forests and to generating maps to aid in decisions pertaining to fire and phytosanitary risk management. The criteria for assessing the values (land cover type, legislative tools for biodiversity conservation, environmental tourist sites and access routes, and timber yield) and the risks (fire and phytosanitation) of P. pinaster forests were obtained directly or by considering specific indicators, and they were subsequently aggregated by means of GIS-based multicriteria analysis. This approach was tested on the island of Corsica (France), and maps to aid in decisions pertaining to fire risk and phytosanitary risk ( M. feytaudi) were obtained for P. pinaster forest management. Study results are used by the technical offices of the local administration— Corsican Agricultural and Rural Development Agency (ODARC)—for planning the conservation of P. pinaster forests with regard to fire prevention and safety and phytosanitary risks. The decision maker took part in the evaluation criteria study (weight, normalization, and classification of the values). Most suitable locations are given to target the public intervention. The methodology presented in this paper could be applied to other species and in other Mediterranean regions.

  6. [New approach for managing microbial risks in food].

    PubMed

    Augustin, Jean-Christophe

    2015-01-01

    The aim of the food legislation is to ensure the protection of human health. Traditionally, the food legislation requires food business operators to apply good hygiene practices and specific procedures to control foodborne pathogens. These regulations allowed reaching a high level of health protection. The improvement of the system will require risk-based approaches. Firstly, risk assessment should allow the identification of high-risk situations where resources should be allocated for a better targeting of risk management. Then, management measures should be adapted to the health objective. In this approach, the appropriate level of protection is converted intofood safety and performance objectives on the food chain, i.e., maximum microbial contamination to fulfil the acceptable risk level. When objectives are defined, the food business operators and competent authorities can identify control options to comply with the objectives and establish microbiological criteria to verify compliance with these objectives. This approach, described for approximately 10 years, operative thanks to the development of quantitative risk assessment techniques, is still difficult to use in practical terms since it requires a commitment of competent authorities to define the acceptable risk and needs also the implementation of sometimes complex risk models.

  7. Risk Management Concepts and Guidance

    DTIC Science & Technology

    1989-03-01

    SUMMARY . ,den.ifying risks 5.3 PROGRAMMATIC RISK SUMMARY o Quantifying risk 5.4 SUPPORTABILITY RISK SUMMARY 55 SCHEDULE RISK SUMMARY * Use of tools to...with Life Cycle Cost Estimates," Defense Systems Management School, (Fort Belvoir). 1973. 207. Lieber, R.S., "New Approaches for Quantifying Risk and

  8. Data Management Guidance in the Context of Climate Risk-Management

    NASA Astrophysics Data System (ADS)

    Sylak-Glassman, E.

    2016-12-01

    Climate risk-management, while a national issue, often occurs at a local level. To prepare for the effects of climate change, community decision-makers require a diverse set of data from historical records, social science, observations, and models, much of which is collected and curated by Federal agencies. The President's Climate Action Plan calls for building stronger and safer communities and infrastructure to prepare the United States for the impacts of climate change, and the Obama Administration has prioritized making Federal data more discoverable, accessible, and usable to inform both climate risk-management, and other data-informed decisions. In order to understand the state of guidance for data provision for climate risk-management, we analyzed Federal, agency, and interagency documents such as the Common Framework for Earth-Observation Data, related to open data, climate data, and data management in general. We examined guidance related to the principles of data discovery, access, and ease of use, as well as the data management categories of application programming interfaces, controlled vocabularies and ontologies, metadata, persistent dataset identifiers, preservation, and usage metrics. This analysis showed both the extent of guidance provided, as well as gaps in guidance. Following the literature review, we held structured conversations with Federal climate data managers and tool developers to identify areas where further efforts could enhance provision of agency data for climate risk-management. Our analysis can be used by data managers to understand how various data management practices can help improve climate risk-management and where to find further guidance.

  9. Risk management abilities in multimodal maritime supply chains: Visibility and control perspectives.

    PubMed

    Vilko, Jyri; Ritala, Paavo; Hallikas, Jukka

    2016-11-29

    Supply chain complexity and disintegration lead to increased uncertainty from a stakeholders' perspective, which is emerging as one of the major challenges of risk management. The ability to identify risks has weakened, as the responsibility of supply chain risk management is handed over to outside service providers. Regardless, the risks, their visibility and their impact depend on the position of the companies in the supply chain. The actors in the chain must therefore collaborate to create effective risk management conditions. This challenging situation is especially pronounced in multimodal maritime supply chains, where the risks and actor focality are high. This paper contributes to current risk management literature by providing a holistic and systemic view of risk visibility and control in maritime supply chains. The study employs broad-based, qualitative interview data collected from actors operating in southern Finland and the Gulf of Finland as well as an expert-panel assessment of the related risk management abilities. The results show a high level of variance in the level of risk identification and visibility between the actors in question. This further suggests that collaboration in supply chain risk management is essential, as an awareness of the risks and their control mechanisms do not necessarily reside in the same company. Copyright © 2016 Elsevier Ltd. All rights reserved.

  10. Managing multihazards risk in metropolitan USA

    NASA Astrophysics Data System (ADS)

    Aktan, A. Emin; Comfort, Louise K.; Shanis, Donald S.

    2003-07-01

    This proposal outlines an action plan for risk management in the Delaware Valley Metropolitan Region. This plan is consistent with the goals for strengthening homeland security announced by President Bush, and is designed to complement efforts currently under development by Pennsylvania Emergency Management Agency and Department of Health. This plan proposes the formation of a Delaware Valley Risk Management Consortium, representing the critical disciplines and organizations related to risk assessment and management. This group would have membership from academic institutions, government agencies, industry, and nonprofit organizations. This Consortium would develop a systemic scope of work with the appropriate recommendations for technology acquisition, development and integration with risk management policies and procedures. This scope of work would include the development of two related information systems for the Delaware Valley Region. The first would be a comprehensive 'health monitoring' system to assess the continuity of operations, which would use integrated remote sensing and imaging, information gathering, communication, computation, and, information processing and management over wide-area networks covering the entire metropolitan area. The second would use real-time information from the health monitoring system to support interactive communication, search and information exchange needed to coordinate action among the relevant agencies to mitigate risk, respond to hazards and manage its resources efficiently and effectively.

  11. Risk management for sulfur dioxide abatement under multiple uncertainties

    NASA Astrophysics Data System (ADS)

    Dai, C.; Sun, W.; Tan, Q.; Liu, Y.; Lu, W. T.; Guo, H. C.

    2016-03-01

    In this study, interval-parameter programming, two-stage stochastic programming (TSP), and conditional value-at-risk (CVaR) were incorporated into a general optimization framework, leading to an interval-parameter CVaR-based two-stage programming (ICTP) method. The ICTP method had several advantages: (i) its objective function simultaneously took expected cost and risk cost into consideration, and also used discrete random variables and discrete intervals to reflect uncertain properties; (ii) it quantitatively evaluated the right tail of distributions of random variables which could better calculate the risk of violated environmental standards; (iii) it was useful for helping decision makers to analyze the trade-offs between cost and risk; and (iv) it was effective to penalize the second-stage costs, as well as to capture the notion of risk in stochastic programming. The developed model was applied to sulfur dioxide abatement in an air quality management system. The results indicated that the ICTP method could be used for generating a series of air quality management schemes under different risk-aversion levels, for identifying desired air quality management strategies for decision makers, and for considering a proper balance between system economy and environmental quality.

  12. 48 CFR 1815.203-72 - Risk management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... approach to managing these risks. [65 FR 70316, Nov. 22, 2000] ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Risk management. 1815.203... Proposals and Information 1815.203-72 Risk management. In all RFPs and RFOs for supplies or services for...

  13. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering... monitored, funding availability, and program management risk. (c) Appropriate techniques should be applied...

  14. [Risk Management: concepts and chances for public health].

    PubMed

    Palm, Stefan; Cardeneo, Margareta; Halber, Marco; Schrappe, Matthias

    2002-01-15

    Errors are a common problem in medicine and occur as a result of a complex process involving many contributing factors. Medical errors significantly reduce the safety margin for the patient and contribute additional costs in health care delivery. In most cases adverse events cannot be attributed to a single underlying cause. Therefore an effective risk management strategy must follow a system approach, which is based on counting and analysis of near misses. The development of defenses against the undesired effects of errors should be the main focus rather than asking the question "Who blundered?". Analysis of near misses (which in this context can be compared to indicators) offers several methodological advantages as compared to the analysis of errors and adverse events. Risk management is an integral element of quality management.

  15. ESMD Risk Management Workshop: Systems Engineering and Integration Risks

    NASA Technical Reports Server (NTRS)

    Thomas, L. Dale

    2005-01-01

    This report has been developed by the National Aeronautics and Space Administration (NASA) Exploration Systems Mission Directorate (ESMD) Risk Management team in close coordination with the Systems Engineering Team. This document provides a point-in-time, cumulative, summary of key lessons learned derived from the SE RFP Development process. Lessons learned invariably address challenges and risks and the way in which these areas have been addressed. Accordingly the risk management thread is woven throughout the document.

  16. Natural-technological risk assessment and management

    NASA Astrophysics Data System (ADS)

    Burova, Valentina; Frolova, Nina

    2016-04-01

    EM-DAT statistical data on human impact and economic damages in the 1st semester 2015 are the highest since 2011: 41% of disasters were floods, responsible for 39% of economic damage and 7% of events were earthquakes responsible for 59% of total death toll. This suggests that disaster risk assessment and management still need to be improved and stay the principle issue in national and international related programs. The paper investigates the risk assessment and management practice in the Russian Federation at different levels. The method is proposed to identify the territories characterized by integrated natural-technological hazard. The maps of the Russian Federation zoning according to the integrated natural-technological hazard level are presented, as well as the procedure of updating the integrated hazard level taking into account the activity of separate processes. Special attention is paid to data bases on past natural and technological processes consequences, which are used for verification of current hazard estimation. The examples of natural-technological risk zoning for the country and some regions territory are presented. Different output risk indexes: both social and economic, are estimated taking into account requirements of end-users. In order to increase the safety of population of the Russian Federation the trans-boundaries hazards are also taken into account.

  17. Risk management assessment of Health Maintenance Organisations participating in the National Health Insurance Scheme

    PubMed Central

    Campbell, Princess Christina; Korie, Patrick Chukwuemeka; Nnaji, Feziechukwu Collins

    2014-01-01

    Background: The National Health Insurance Scheme (NHIS), operated majorly in Nigeria by health maintenance organisations (HMOs), took off formally in June 2005. In view of the inherent risks in the operation of any social health insurance, it is necessary to efficiently manage these risks for sustainability of the scheme. Consequently the risk-management strategies deployed by HMOs need regular assessment. This study assessed the risk management in the Nigeria social health insurance scheme among HMOs. Materials and Methods: Cross-sectional survey of 33 HMOs participating in the NHIS. Results: Utilisation of standard risk-management strategies by the HMOs was 11 (52.6%). The other risk-management strategies not utilised in the NHIS 10 (47.4%) were risk equalisation and reinsurance. As high as 11 (52.4%) of participating HMOs had a weak enrollee base (less than 30,000 and poor monthly premium and these impacted negatively on the HMOs such that a large percentage 12 (54.1%) were unable to meet up with their financial obligations. Most of the HMOs 15 (71.4%) participated in the Millennium development goal (MDG) maternal and child health insurance programme. Conclusions: Weak enrollee base and poor monthly premium predisposed the HMOs to financial risk which impacted negatively on the overall performance in service delivery in the NHIS, further worsened by the non-utilisation of risk equalisation and reinsurance as risk-management strategies in the NHIS. There is need to make the scheme compulsory and introduce risk equalisation and reinsurance. PMID:25298605

  18. Rethinking 'risk' and self-management for chronic illness.

    PubMed

    Morden, Andrew; Jinks, Clare; Ong, Bie Nio

    2012-02-01

    Self-management for chronic illness is a current high profile UK healthcare policy. Policy and clinical recommendations relating to chronic illnesses are framed within a language of lifestyle risk management. This article argues the enactment of risk within current UK self-management policy is intimately related to neo-liberal ideology and is geared towards population governance. The approach that dominates policy perspectives to 'risk' management is critiqued for positioning people as rational subjects who calculate risk probabilities and act upon them. Furthermore this perspective fails to understand the lay person's construction and enactment of risk, their agenda and contextual needs when living with chronic illness. Of everyday relevance to lay people is the management of risk and uncertainty relating to social roles and obligations, the emotions involved when encountering the risk and uncertainty in chronic illness, and the challenges posed by social structural factors and social environments that have to be managed. Thus, clinical enactments of self-management policy would benefit from taking a more holistic view to patient need and seek to avoid solely communicating lifestyle risk factors to be self-managed.

  19. Risk Management and Adaptation Transition Mechanisms and Pathways in New York City

    NASA Astrophysics Data System (ADS)

    Link, H. D.

    2016-12-01

    Understanding the values that drive current decision-making is essential to effective management of critical urban infrastructure. As urban infrastructure becomes increasingly interconnected, risks in one sector can translate to citywide risk in the flash of a photon or the blink of an eye. Approaches and goals of risk management vary across geographies. Administrators and residents attempt to reduce vulnerability to hazards and limit the scope of disasters in different ways in different contexts. Public and personal risk management decision making regimes are complex and often shifting. While the overarching goal is to try to reduce the level of risk faced by stakeholders in a particular locale, the conditions and changing character of local risk management decisions are affected by physical, economic and social factors. Opportunities for meaningful action are found at this nexus. To illuminate this nexus, this paper provides a detailed discussion and analysis of the New York City risk management regime and its trajectory as defined by local experts. The risk focus of the analysis is storm surge and flooding, and heat stress. The analysis examines the factors that enable movement and transition between different adaptive regimes, and on factors that support lock-in of current regime status The research utilizes a risk management framework based on four policy states developed for the Transformation and Resilience in the Urban Coast (TRUC) project (Solecki et al. 2016). "Collapse"; a state where there is no strategic risk planning; "Resistance"; risk planning that is directed at stability and aims at protecting current development pathways; "Resilience"; flexible planning that aims at introducing some changes to maintain current development, and "Transformation"; planning for fundamental changes in risk management including changing development choices and paths to accommodate uncertainty and future risk scenarios. (Solecki et al. 2016). To examine the risk

  20. Cyber Risk Management for Critical Infrastructure: A Risk Analysis Model and Three Case Studies.

    PubMed

    Paté-Cornell, M-Elisabeth; Kuypers, Marshall; Smith, Matthew; Keller, Philip

    2018-02-01

    Managing cyber security in an organization involves allocating the protection budget across a spectrum of possible options. This requires assessing the benefits and the costs of these options. The risk analyses presented here are statistical when relevant data are available, and system-based for high-consequence events that have not happened yet. This article presents, first, a general probabilistic risk analysis framework for cyber security in an organization to be specified. It then describes three examples of forward-looking analyses motivated by recent cyber attacks. The first one is the statistical analysis of an actual database, extended at the upper end of the loss distribution by a Bayesian analysis of possible, high-consequence attack scenarios that may happen in the future. The second is a systems analysis of cyber risks for a smart, connected electric grid, showing that there is an optimal level of connectivity. The third is an analysis of sequential decisions to upgrade the software of an existing cyber security system or to adopt a new one to stay ahead of adversaries trying to find their way in. The results are distributions of losses to cyber attacks, with and without some considered countermeasures in support of risk management decisions based both on past data and anticipated incidents. © 2017 Society for Risk Analysis.

  1. Marine and Hydrokinetic Technology Development Risk Management Framework

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Snowberg, David; Weber, Jochem

    2015-09-01

    Over the past decade, the global marine and hydrokinetic (MHK) industry has suffered a number of serious technological and commercial setbacks. To help reduce the risks of industry failures and advance the development of new technologies, the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) developed an MHK Risk Management Framework. By addressing uncertainties, the MHK Risk Management Framework increases the likelihood of successful development of an MHK technology. It covers projects of any technical readiness level (TRL) or technical performance level (TPL) and all risk types (e.g. technological risk, regulatory risk, commercial risk) over themore » development cycle. This framework is intended for the development and deployment of a single MHK technology—not for multiple device deployments within a plant. This risk framework is intended to meet DOE’s risk management expectations for the MHK technology research and development efforts of the Water Power Program (see Appendix A). It also provides an overview of other relevant risk management tools and documentation.1 This framework emphasizes design and risk reviews as formal gates to ensure risks are managed throughout the technology development cycle. Section 1 presents the recommended technology development cycle, Sections 2 and 3 present tools to assess the TRL and TPL of the project, respectively. Section 4 presents a risk management process with design and risk reviews for actively managing risk within the project, and Section 5 presents a detailed description of a risk registry to collect the risk management information into one living document. Section 6 presents recommendations for collecting and using lessons learned throughout the development process.« less

  2. Assessing and Managing Multiple Risks in a Changing World ...

    EPA Pesticide Factsheets

    Roskilde University hosted a November 2015 workshop on “Environmental Risk – Assessing and Managing Multiple Risks in a Changing World”. Thirty attendees from 9 countries developed consensus recommendations regarding: implementation of a common currency (ecosystem services) for holistic environmental risk assessment and management; improvements to risk assessment and management in a complex, human-modified, and changing world; appropriate development of protection goals in a 2-stage process involving both universal and site-, region-, or problem-specific protection goals; addressing societal issues; risk management information needs; conducting risk assessment of risk management; and development of adaptive and flexible regulatory systems. We encourage both cross- and inter-disciplinary approaches to address 10 recommendations: 1) adopt ecosystem services as a common currency for risk assessment and management; 2) consider cumulative stressors (chemical and non-chemical) and determine which dominate to best manage and restore ecosystem services; 3) fully integrate risk managers and communities of interest into the risk assessment process; 4) fully integrate risk assessors and communities of interest into the risk management process; 5) consider socio-economics and increase transparency in both risk assessment and risk management; 6) recognize the ethical rights of humans and ecosystems to an adequate level of protection; 7) determine relevant reference con

  3. Risk management, derivatives and shariah compliance

    NASA Astrophysics Data System (ADS)

    Bacha, Obiyathulla Ismath

    2013-04-01

    Despite the impressive growth of Islamic Banking and Finance (IBF), a number of weaknesses remain. The most important of this is perhaps the lack of shariah compliant risk management tools. While the risk sharing philosophy of Islamic Finance requires the acceptance of risk to justify returns, the shariah also requires adherents to avoid unnecessary risk-maysir. The requirement to avoid maysir is in essence a call for the prudent management of risk. Contemporary risk management revolves around financial engineering, the building blocks of which are financial derivatives. Despite the proven efficacy of derivatives in the management of risk in the conventional space, shariah scholars appear to be suspicious and uneasy with their use in IBF. Some have imposed outright prohibition of their use. This paper re-examines the issue of contemporary derivative instruments and shariah compliance. The shariah compatibility of derivatives is shown in a number of ways. First, by way of qualitative evaluation of whether derivatives can be made to comply with the key prohibitions of the sharia. Second, by way of comparing the payoff profiles of derivatives with risk sharing finance and Bai Salam contracts. Finally, the equivalence between shariah compliant derivatives like the IPRS and Islamic FX Currency Forwards with conventional ones is presented.

  4. How does genetic risk information for Lynch syndrome translate to risk management behaviours?

    PubMed

    Steel, Emma; Robbins, Andrew; Jenkins, Mark; Flander, Louisa; Gaff, Clara; Keogh, Louise

    2017-01-01

    There is limited research on why some individuals who have undergone predictive genetic testing for Lynch syndrome do not adhere to screening recommendations. This study aimed to explore qualitatively how Lynch syndrome non-carriers and carriers translate genetic risk information and advice to decisions about risk managment behaviours in the Australian healthcare system. Participants of the Australasian Colorectal Cancer Family Registry who had undergone predictive genetic testing for Lynch syndrome were interviewed on their risk management behaviours. Transcripts were analysed thematically using a comparative coding analysis. Thirty-three people were interviewed. Of the non-carriers ( n  = 16), 2 reported having apparently unnecessary colonoscopies, and 6 were unsure about what population-based colorectal cancer screening entails. Of the carriers ( n  = 17), 2 reported they had not had regular colonoscopies, and spoke about their discomfort with the screening process and a lack of faith in the procedure's ability to reduce their risk of developing colorectal cancer. Of the female carriers ( n  = 9), 2 could not recall being informed about the associated risk of gynaecological cancers. Non-carriers and female carriers of Lynch syndrome could benefit from further clarity and advice about appropriate risk management options. For those carriers who did not adhere to colonoscopy screening, a lack of faith in both genetic test results and screening were evident. It is essential that consistent advice is offered to both carriers and non-carriers of Lynch syndrome.

  5. Consumer responses to communication about food risk management.

    PubMed

    van Dijk, Heleen; Houghton, Julie; van Kleef, Ellen; van der Lans, Ivo; Rowe, Gene; Frewer, Lynn

    2008-01-01

    Recent emphasis within policy circles has been on transparent communication with consumers about food risk management decisions and practices. As a consequence, it is important to develop best practice regarding communication with the public about how food risks are managed. In the current study, the provision of information about regulatory enforcement, proactive risk management, scientific uncertainty and risk variability were manipulated in an experiment designed to examine their impact on consumer perceptions of food risk management quality. In order to compare consumer reactions across different cases, three food hazards were selected (mycotoxins on organically grown food, pesticide residues, and a genetically modified potato). Data were collected from representative samples of consumers in Germany, Greece, Norway and the UK. Scores on the "perceived food risk management quality" scale were subjected to a repeated-measures mixed linear model. Analysis points to a number of important findings, including the existence of cultural variation regarding the impact of risk communication strategies-something which has obvious implications for pan-European risk communication approaches. For example, while communication of uncertainty had a positive impact in Germany, it had a negative impact in the UK and Norway. Results also indicate that food risk managers should inform the public about enforcement of safety laws when communicating scientific uncertainty associated with risks. This has implications for the coordination of risk communication strategies between risk assessment and risk management organizations.

  6. Governance of environmental risk: new approaches to managing stakeholder involvement.

    PubMed

    Benn, Suzanne; Dunphy, Dexter; Martin, Andrew

    2009-04-01

    Disputes concerning industrial legacies such as the disposal of toxic wastes illustrate changing pressures on corporations and governments. Business and governments are now confronted with managing the expectations of a society increasingly aware of the social and environmental impacts and risks associated with economic development and demanding more equitable distribution and democratic management of such risks. The closed managerialist decision-making of the powerful bureaucracies and corporations of the industrial era is informed by traditional management theory which cannot provide a framework for the adequate governance of these risks. Recent socio-political theories have conceptualised some key themes that must be addressed in a more fitting approach to governance. We identify more recent management and governance theory which addresses these themes and develop a process-based approach to governance of environmental disputes that allows for the evolving nature of stakeholder relations in a highly complex multiple stakeholder arena.

  7. Assessment of environmental risks from toxic and nontoxic stressors; a proposed concept for a risk-based management tool for offshore drilling discharges.

    PubMed

    Smit, Mathijs G D; Jak, Robbert G; Rye, Henrik; Frost, Tone Karin; Singsaas, Ivar; Karman, Chris C

    2008-04-01

    In order to improve the ecological status of aquatic systems, both toxic (e.g., chemical) and nontoxic stressors (e.g., suspended particles) should be evaluated. This paper describes an approach to environmental risk assessment of drilling discharges to the sea. These discharges might lead to concentrations of toxic compounds and suspended clay particles in the water compartment and concentrations of toxic compounds, burial of biota, change in sediment structure, and oxygen depletion in marine sediments. The main challenges were to apply existing protocols for environmental risk assessment to nontoxic stressors and to combine risks arising from exposure to these stressors with risk from chemical exposure. The defined approach is based on species sensitivity distributions (SSDs). In addition, precautionary principles from the EU-Technical Guidance Document were incorporated to assure that the method is acceptable in a regulatory context. For all stressors a protocol was defined to construct an SSD for no observed effect concentrations (or levels; NOEC(L)-SSD) to allow for the calculation of the potentially affected fraction of species from predicted exposures. Depending on the availability of data, a NOEC-SSD for toxicants can either be directly based on available NOECs or constructed from the predicted no effect concentration and the variation in sensitivity among species. For nontoxic stressors a NOEL-SSD can be extrapolated from an SSD based on effect or field data. Potentially affected fractions of species at predicted exposures are combined into an overall risk estimate. The developed approach facilitates environmental management of drilling discharges and can be applied to define risk-mitigating measures for both toxic and nontoxic stress.

  8. Assessing and managing multiple risks in a changing world ...

    EPA Pesticide Factsheets

    Roskilde University (Denmark) hosted a November 2015 workshop, Environmental Risk—Assessing and Managing Multiple Risks in a Changing World. This Focus article presents the consensus recommendations of 30 attendees from 9 countries regarding implementation of a common currency (ecosystem services) for holistic environmental risk assessment and management; improvements to risk assessment and management in a complex, human-modified, and changing world; appropriate development of protection goals in a 2-stage process; dealing with societal issues; risk-management information needs; conducting risk assessment of risk management; and development of adaptive and flexible regulatory systems. The authors encourage both cross-disciplinary and interdisciplinary approaches to address their 10 recommendations: 1) adopt ecosystem services as a common currency for risk assessment and management; 2) consider cumulative stressors (chemical and nonchemical) and determine which dominate to best manage and restore ecosystem services; 3) fully integrate risk managers and communities of interest into the risk-assessment process; 4) fully integrate risk assessors and communities of interest into the risk-management process; 5) consider socioeconomics and increased transparency in both risk assessment and risk management; 6) recognize the ethical rights of humans and ecosystems to an adequate level of protection; 7) determine relevant reference conditions and the proper ecological c

  9. Perception and Management of Risk in Internet-Based Peer-to-Peer Milk-Sharing

    ERIC Educational Resources Information Center

    Gribble, Karleen D.

    2014-01-01

    The perception and management of the risks of peer-to-peer milk sharing was explored via a written questionnaire administered to 97 peer milk donors and 41 peer milk recipients who were recruited via Facebook. All recipients' respondents were aware that there were risks associated with using peer-shared milk and took action to mitigate these…

  10. General RMP Guidance - Chapter 9: Risk Management Plan

    EPA Pesticide Factsheets

    You must submit one risk management plan (RMP) to EPA for all of your covered processes. The internet-based RMP*eSubmit allows you to submit your RMP in EPA's Central Data Exchange (CDX), where you can access and change/correct existing RMPs.

  11. [Risk management project: reactive or proactive approach?].

    PubMed

    Vastola, Pasquale; Saracino, Donato M T

    2006-01-01

    Risk management in healthcare refers to the process of developing strategies aimed at preventing and controlling the risk of occurrence of errors and harmful events. The final objective is primarily that of increasing patient safety and secondarily, that of reducing the financial burden of adverse events. The implementation of a risk management system is therefore of vital strategic importance. Nevertheless, a fundamental question that needs to be answered in the operational phase is: should a proactive or reactive approach to risk management be taken? In our view, proactive risk management has many advantages over a reactive approach and is therefore preferable. The reactive approach should be taken exclusively to obtain information regarding risk and errors, in the preliminary, as well as monitoring and follow-up phases of the project.

  12. Preparing disabled students for professional practice: managing risk through a principles-based approach.

    PubMed

    Hargreaves, Janet; Walker, Lizzie

    2014-08-01

    A discussion exploring the ways disabled students are managed in practice settings. It proposes and argues for morally and legally viable principles to guide risk assessment and inclusive decision-making in practice. Equality law means that universities are bound not to discriminate against students on the basis, amongst other things, of disability. As a consequence in the UK, there is a perceived increase in numbers of disabled people applying for and succeeding as health professionals. Whilst placement providers are equally obliged by the law to have inclusive policies, competing needs including patient safety, public confidence and professional regulations mean that adjustments that can be made in an educational environment to appropriately support student learning may prove to be more difficult in placements that provide direct care to the public. This discussion is an outcome of recommendations from published research by the authors and their research partners. It is supported by related literature, critical debate amongst academics, disabled students and disabled and non-disabled practitioners. Ensuring a nursing workforce that mirrors the diversity of the population it serves is of universal importance. Effective management of disabled students can contribute to achieving this goal and to promoting a positive view of disabled practitioners. Legislation is necessary to protect disabled people from discrimination. To respect this legislation, when preparing nurses and other health professions, a clear understanding of the law and a principles-based approach to guiding risk is important. © 2014 John Wiley & Sons Ltd.

  13. Managing uncertainty about food risks - Consumer use of food labelling.

    PubMed

    Tonkin, Emma; Coveney, John; Meyer, Samantha B; Wilson, Annabelle M; Webb, Trevor

    2016-12-01

    General consumer knowledge of and engagement with the production of food has declined resulting in increasing consumer uncertainty about, and sensitivity to, food risks. Emphasis is therefore placed on providing information for consumers to reduce information asymmetry regarding food risks, particularly through food labelling. This study examines the role of food labelling in influencing consumer perceptions of food risks. In-depth, 1-h interviews were conducted with 24 Australian consumers. Participants were recruited based on an a priori defined food safety risk scale, and to achieve a diversity of demographic characteristics. The methodological approach used, adaptive theory, was chosen to enable a constant interweaving of theoretical understandings and empirical data throughout the study. Participants discussed perceiving both traditional (food spoilage/microbial contamination) and modern (social issues, pesticide and 'chemical' contamination) risks as present in the food system. Food labelling was a symbol of the food system having managed traditional risks, and a tool for consumers to personally manage perceived modern risks. However, labelling also raised awareness of modern risks not previously considered. The consumer framing of risk presented demonstrates the need for more meaningful consumer engagement in policy decision making to ensure risk communication and management meet public expectations. This research innovatively identifies food labelling as both a symbol of, and a tool for, the management of perceived risks for consumers. Therefore it is imperative that food system actors ensure the authenticity and trustworthiness of all aspects of food labelling, not only those related to food safety. Copyright © 2016 Elsevier Ltd. All rights reserved.

  14. Improving risk management: from lame excuses to principled practice.

    PubMed

    Paté-Cornell, Elisabeth; Cox, Louis Anthony

    2014-07-01

    The three classic pillars of risk analysis are risk assessment (how big is the risk and how sure can we be?), risk management (what shall we do about it?), and risk communication (what shall we say about it, to whom, when, and how?). We propose two complements as important parts of these three bases: risk attribution (who or what addressable conditions actually caused an accident or loss?) and learning from experience about risk reduction (what works, and how well?). Failures in complex systems usually evoke blame, often with insufficient attention to root causes of failure, including some aspects of the situation, design decisions, or social norms and culture. Focusing on blame, however, can inhibit effective learning, instead eliciting excuses to deflect attention and perceived culpability. Productive understanding of what went wrong, and how to do better, thus requires moving past recrimination and excuses. This article identifies common blame-shifting "lame excuses" for poor risk management. These generally contribute little to effective improvements and may leave real risks and preventable causes unaddressed. We propose principles from risk and decision sciences and organizational design to improve results. These start with organizational leadership. More specifically, they include: deliberate testing and learning-especially from near-misses and accident precursors; careful causal analysis of accidents; risk quantification; candid expression of uncertainties about costs and benefits of risk-reduction options; optimization of tradeoffs between gathering additional information and immediate action; promotion of safety culture; and mindful allocation of people, responsibilities, and resources to reduce risks. We propose that these principles provide sound foundations for improving successful risk management. © 2014 Society for Risk Analysis.

  15. [Ecological risk assessment and its management of Bailongjiang watershed, southern Gansu based on landscape pattern].

    PubMed

    Gong, Jie; Zhao, Cai-Xia; Xie, Yu-Chu; Gao, Yan-Jing

    2014-07-01

    Watershed ecological risk assessment is an important research subject of watershed ecological protection and environmental management. Research on the ecological risk focuses on addressing the influence of human activities and its spatial variation at watershed scale is vital to policy-making to control the impact of human activity and protocols for sustainable economic and societal development. A comprehensive ecological environment index, incorporating a landscape index and an assessment of ecological vulnerability, was put forward to assess the spatio-temporal characteristics of ecological risk of the Bailongjiang watershed, southern Gansu Province, Northwest China. Using ArcGIS and Fragstats software and a land use map of 2010, an ecological risk map was obtained through spatial sampling and disjunctive Kriging interpolation. The results indicated that there were some obvious spatial differences of ecological risk levels in the watershed. The ecological risk level of the north and northwest of the Bailongjiang was higher than that of the western and southern extremities of the watershed. Ecological risk index (ERI) of Wudu and Tanchang was higher than that of Wenxian and Diebu. Some measures for ecological risk management were put forward on the basis of ERI of Bailongjiang watershed. To strengthen the integrated management of human activities and land use in the watershed, to carry out the vegetation restoration and ecological reconstruction, and to reduce the ecological risks and hazards of irrational human disturbance, are vital to the realization 'multiple-win' of the economic, social and ecological protection and for the sustainable development in the hilly area in southern Gansu.

  16. Adventure Program Risk Management Report: 1998 Edition. Narratives and Data from 1991-1997.

    ERIC Educational Resources Information Center

    Leemon, Drew, Ed.; Schimelpfenig, Tod, Ed.; Gray, Sky, Ed.; Tarter, Shana, Ed.; Williamson, Jed, Ed.

    The Wilderness Risk Managers Committee (WRMC), a consortium of outdoor schools and organizations, works toward better understanding and management of risks in the wilderness. Among other activities, the WRMC gathers data on incidents and accidents from member organizations and other wilderness-based programs. This book compiles incident data for…

  17. Routine culture-based screening versus risk-based management for the prevention of early-onset group B streptococcus disease in the neonate: a systematic review.

    PubMed

    Kurz, Ella; Davis, Deborah

    2015-04-17

    Early-onset group B streptococcus disease, recognized as the most common cause of early onset neonatal sepsis in developed countries, is transmitted vertically from the group B streptococcus carrier mother to the neonate in the peripartum. Accordingly, early-onset group B streptococcus disease is prevented by halting the transmission of the microorganism from the mother to the infant. Two main methods, routine culture-based screening and risk-based management, may be used in the identification of mothers requiring intrapartum antibiotic prophylaxis in labor. While there are advantages and disadvantages to each, there is limited high level evidence available as to which method is superior. To identify the effectiveness of risk-based management versus routine culture-based screening in the prevention of early-onset group B streptococcus disease in the neonate. This review considered studies which treated pregnant women with intrapartum antibiotic prophylaxis following risk- and culture-based protocols for the prevention of early-onset group B streptococcus disease in the neonate. Types of intervention: This review considered studies that evaluated risk-based management against routine culture-based screening for the prevention of early-onset group B streptococcus disease in the neonate. Types of studies: This review looked for highest evidence available which in this case consisted of one quasi experimental study and eight comparative cohort studies with historical or concurrent control groups. Types of outcomes: Incidence of early-onset group B streptococcus disease in neonates as measured by positive group B streptococcus culture from an otherwise sterile site. Secondary outcomes include neonatal death due to group B streptococcus sepsis and percentage of women who received intrapartum antibiotic prophylaxis. A multi-step search strategy was used to find studies which were limited to the English language and published between January 2000 and June 2013. The quality

  18. The risk concept and its application in natural hazard risk management in Switzerland

    NASA Astrophysics Data System (ADS)

    Bründl, M.; Romang, H. E.; Bischof, N.; Rheinberger, C. M.

    2009-05-01

    Over the last ten years, a risk-based approach to manage natural hazards - termed the risk concept - has been introduced to the management of natural hazards in Switzerland. Large natural hazard events, new political initiatives and limited financial resources have led to the development and introduction of new planning instruments and software tools that should support natural hazard engineers and planners to effectively and efficiently deal with natural hazards. Our experience with these new instruments suggests an improved integration of the risk concept into the community of natural hazard engineers and planners. Important factors for the acceptance of these new instruments are the integration of end-users during the development process, the knowledge exchange between science, developers and end-users as well as training and education courses for users. Further improvements require the maintenance of this knowledge exchange and a mindful adaptation of the instruments to case-specific circumstances.

  19. Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Urban, Mary Elizabeth

    Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, andmore » monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.« less

  20. Emerging contaminants in the environment: Risk-based analysis for better management.

    PubMed

    Naidu, Ravi; Arias Espana, Victor Andres; Liu, Yanju; Jit, Joytishna

    2016-07-01

    Emerging contaminants (ECs) are chemicals of a synthetic origin or deriving from a natural source that has recently been discovered and for which environmental or public health risks are yet to be established. This is due to limited available information on their interaction and toxicological impacts on receptors. Several types of ECs exist such as antibiotics, pesticides, pharmaceuticals, personal care products, effluents, certain naturally occurring contaminants and more recently nanomaterials. ECs may derive from a known source, for example released directly to the aquatic environment from direct discharges such as those from wastewater treatment plants. Although in most instances the direct source cannot be identified, ECs have been detected in virtually every country's natural environment and as a consequence they represent a global problem. There is very limited information on the fate and transport of ECs in the environment and their toxicological impact. This lack of information can be attributed to limited financial resources and the lack of analytical techniques for detecting their effects on ecosystems and human health on their own or as mixture. We do not know how ECs interact with each other or various contaminants. This paper presents an overview of existing knowledge on ECs, their fate and transport and a risk-based analysis for ECs management and complementary strategies. Copyright © 2016 Elsevier Ltd. All rights reserved.

  1. Current Chemical Risk Management Activities

    EPA Pesticide Factsheets

    EPA's existing chemicals programs address pollution prevention, risk assessment, hazard and exposure assessment and/or characterization, and risk management for chemicals substances in commercial use.

  2. GNSS-based emergency management system

    NASA Astrophysics Data System (ADS)

    Wu, Yuhang; Chen, Xiuwan; Ma, Lei

    2009-06-01

    Public safety and public service is a particularly challenging task. The questions of how to use the limited resources efficiently, how to improve the Government's emergency rapid response and ability of risk resistance, and how to provide a more efficient emergency service for the public, have increasingly become the focus to strengthen urban management. Emergency Response Management System is a highly efficient and powerful command system dealing with natural and social disasters, by using all aspects of the force being gathered in a short period of time, sudden events can be handled efficiently, and further development of the incident can be controlled. In this paper, based on the analysis of development status of the emergency management system at home and abroad, and the key technologies of the emergency management system based on GNSS, research and development on emergency command system based on GNSS has been done. Meanwhile, test in Sichuan earthquake has also been carried out. Practice in Sichuan province earthquake relief work has proved that the emergency management command system based on GNSS can play the advantage function and exert the maximum potential, and can play the role of "lifeline" in the critical moment.

  3. USEPA’s Land‐Based Materials Management Exposure and Risk Assessment Tool System

    EPA Science Inventory

    It is recognized that some kinds of 'waste' materials can in fact be reused as input materials for making safe products that benefit society. RIMM (Risk-Informed Materials Management) provides an integrated data gathering and analysis capability to enable scientifically rigorous ...

  4. Improving Information Security Risk Management

    ERIC Educational Resources Information Center

    Singh, Anand

    2009-01-01

    manaOptimizing risk to information to protect the enterprise as well as to satisfy government and industry mandates is a core function of most information security departments. Risk management is the discipline that is focused on assessing, mitigating, monitoring and optimizing risks to information. Risk assessments and analyses are critical…

  5. Web-Based Real Time Earthquake Forecasting and Personal Risk Management

    NASA Astrophysics Data System (ADS)

    Rundle, J. B.; Holliday, J. R.; Graves, W. R.; Turcotte, D. L.; Donnellan, A.

    2012-12-01

    Earthquake forecasts have been computed by a variety of countries and economies world-wide for over two decades. For the most part, forecasts have been computed for insurance, reinsurance and underwriters of catastrophe bonds. One example is the Working Group on California Earthquake Probabilities that has been responsible for the official California earthquake forecast since 1988. However, in a time of increasingly severe global financial constraints, we are now moving inexorably towards personal risk management, wherein mitigating risk is becoming the responsibility of individual members of the public. Under these circumstances, open access to a variety of web-based tools, utilities and information is a necessity. Here we describe a web-based system that has been operational since 2009 at www.openhazards.com and www.quakesim.org. Models for earthquake physics and forecasting require input data, along with model parameters. The models we consider are the Natural Time Weibull (NTW) model for regional earthquake forecasting, together with models for activation and quiescence. These models use small earthquakes ('seismicity-based models") to forecast the occurrence of large earthquakes, either through varying rates of small earthquake activity, or via an accumulation of this activity over time. These approaches use data-mining algorithms combined with the ANSS earthquake catalog. The basic idea is to compute large earthquake probabilities using the number of small earthquakes that have occurred in a region since the last large earthquake. Each of these approaches has computational challenges associated with computing forecast information in real time. Using 25 years of data from the ANSS California-Nevada catalog of earthquakes, we show that real-time forecasting is possible at a grid scale of 0.1o. We have analyzed the performance of these models using Reliability/Attributes and standard Receiver Operating Characteristic (ROC) tests. We show how the Reliability and

  6. Drought early warning and risk management in a changing environment

    NASA Astrophysics Data System (ADS)

    Pulwarty, R. S.

    2011-12-01

    Drought has long been recognized as falling into the category of incremental but long-term and cumulative environmental changes, also termed slow-onset or creeping events. These event types would include: air and water quality decline, desertification processes, deforestation and forest fragmentation, loss of biodiversity and habitats, and nitrogen overloading, among others. Climate scientists continue to struggle with recognizing the onset of drought and scientists and policy makers continue to debate the basis (i.e., criteria) for declaring an end to a drought. Risk-based management approaches to drought planning at the national and regional levels have been recommended repeatedly over the years but their prototyping, testing and operational implementation have been limited. This presentation will outline two avenues for disaster risk reduction in the context of drought (1) integrated early warning information systems, and (2) linking disaster risk reduction to climate change adaptation strategies. Adaptation involves not only using operational facilities and infrastructure to cope with the immediate problems but also leaving slack or reserve for coping with multiple stress problems that produce extreme impacts and surprise. Increasing the 'anticipatability' of an event, involves both monitoring of key indicators from appropriate baseline data, and observing early warning signs that assumptions in risk management plans are failing and critical transitions are occurring. Illustrative cases will be drawn from the IPCC Special Report on Managing the Risks of Extreme Events and Disasters (2011), the UN Global Assessment of Disaster Risk Reduction (2011) and implementation activities in which the author has been engaged. Most drought early warning systems have tended to focus on the development and use of physical system indicators and forecasts of trends and thresholds. We show that successful early warning systems that meet expectations of risk management also have

  7. Wildfire Risk Management: Challenges and Opportunities

    NASA Astrophysics Data System (ADS)

    Thompson, M.; Calkin, D. E.; Hand, M. S.; Kreitler, J.

    2014-12-01

    In this presentation we address federal wildfire risk management largely through the lens of economics, targeting questions related to costs, effectiveness, efficiency, and tradeoffs. Beyond risks to resources and assets such as wildlife habitat, watersheds, and homes, wildfires present financial risk and budgetary instability for federal wildfire management agencies due to highly variable annual suppression costs. Despite its variability, the costs of wildfire management have continued to escalate and account for an ever-growing share of overall agency budgets, compromising abilities to attain other objectives related to forest health, recreation, timber management, etc. Trends associated with a changing climate and human expansion into fire-prone areas could lead to additional suppression costs in the future, only further highlighting the need for an ability to evaluate economic tradeoffs in investments across the wildfire management spectrum. Critically, these economic analyses need to accurately capture the complex spatial and stochastic aspects of wildfire, the inherent uncertainty associated with monetizing environmental impacts of wildfire, the costs and effectiveness of alternative management policies, and linkages between pre-fire investments and active incident management. Investing in hazardous fuels reduction and forest restoration in particular is a major policy lever for pre-fire risk mitigation, and will be a primary focus of our presentation. Evaluating alternative fuel management and suppression policies could provide opportunities for significant efficiency improvements in the development of risk-informed management fire management strategies. Better understanding tradeoffs of fire impacts and costs can help inform policy questions such as how much of the landscape to treat and how to balance investments in treating new areas versus maintaining previous investments. We will summarize current data needs, knowledge gaps, and other factors

  8. [Risk management from the judicial perspective].

    PubMed

    Ulsenheimer, Klaus

    2003-11-01

    The jurisdification of medicine is an unstoppable force that finds its visible expression in a medical liability boom which--apart from the negative impact of legal and out-of-court proceedings on the bond of the doctor-patient relationship--bears considerable economic disadvantages for the providers of care. It is therefore necessary to fight in particular the legally influenced causes of medical liability for which risk management seems to be a suitable, effective tool. As the examples taken from the jurisdiction in the organisational sector will demonstrate, risk management pinpoints the sources of trouble so that we are able to learn from current errors and provide appropriate remedies for the future. Risk management, though, is not a "unique event", but a dynamic, repetitive process that has to be institutionally secured by appointing a risk manager so that the proposals discussed, recommendations and essential measures can actually be implemented.

  9. Dams, Hydrology and Risk in Future River Management

    NASA Astrophysics Data System (ADS)

    Wegner, D. L.

    2017-12-01

    Across America there are over 80,000 large to medium dams and globally the number is in excess of 800,000. Currently there are over 1,400 dams and diversion structures being planned or under construction globally. In addition to these documented dams there are thousands of small dams populating watersheds. Governments, agencies, native tribes, private owners and regulators all have a common interest in safe dams. Often dam safety is characterized as reducing structural risk while providing for maximum operational flexibility. In the 1970's there were a number of large and small dam failures in the United States. These failures prompted the federal government to issue voluntary dam safety guidelines. These guidelines were based on historic information incorporated into a risk assessment process to analyze, evaluate and manage risk with the goal to improve the quality of and support of dam management and safety decisions. We conclude that historic and new risks need to be integrated into dam management to insure adequate safety and operational flexibility. A recent assessment of the future role of dams in the United States premises that future costs such as maintenance or removal beyond the economic design life have not been factored into the long-term operations or relicensing of dams. The converging risks associated with aging water storage infrastructure, multiple dams within watersheds and uncertainty in demands policy revisions and an updated strategic approach to dam safety. Decisions regarding the future of dams in the United States may, in turn, influence regional water planning and management. Leaders in Congress and in the states need to implement a comprehensive national water assessment and a formal analysis of the role dams play in our water future. A research and national policy agenda is proposed to assess future impacts and the design, operation, and management of watersheds and dams.

  10. Reviewing the economic efficiency of disaster risk management

    NASA Astrophysics Data System (ADS)

    Mechler, Reinhard

    2013-04-01

    There is a lot of rhetoric suggesting that disaster risk management (DRM) pays, yet surprisingly little in the way of hard facts. Cost-benefit analysis (CBA) is one major tool that can provide quantitative information about the prioritization of disaster risk management (DRM) (and climate adaptation) based on economic principles. Yet, on a global scale, there has been surprisingly little robust evidence on the economic efficiency and benefits of risk management measures. This review shows that for the limited evidence reported the economic case for DRM across a range of hazards is strong and that the benefits of investing in DRM outweigh the costs of doing so, on average, by about four times the cost in terms of avoided and reduced losses. Most studies using a CBA approach focus on structural DRM and most information has been made available on physical flood prevention. There have been some limited studies on preparedness and risk financing. The global evidence base is limited and estimates appear not very solid, and overall, in line with the conclusion of the recent IPCC SREX report, there is limited evidence and medium agreement across the literature. Some of the factors behind the limited robustness are inherent to CBA more widely: these challenges comprise the inability to price intangibles, evaluating strategies rather than single projects, difficulties in assessing softer rather than infrastructure-related options, choices regarding a proper discount rate, lack of accounting for the distribution of benefits and costs and difficulties with assessing nonmarket values such as those related to health, the environment, or public goods. Although techniques exist to address some of these challenges, they are not very likely to easily go away. Other challenges associated specifically with DRM, such as the need and difficulty to undertake risk -based analysis can be overcome, and there have been manuals and reports providing a way forward. In an age of austerity, cost

  11. 76 FR 45724 - Clearing Member Risk Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-01

    ... Management AGENCY: Commodity Futures Trading Commission. ACTION: Notice of proposed rulemaking. SUMMARY: The... proposed rules address risk management for cleared trades by futures commission merchants, swap dealers... Commission has proposed extensive regulations addressing open access and risk management at the derivatives...

  12. Sustainable nanotechnology decision support system: bridging risk management, sustainable innovation and risk governance

    NASA Astrophysics Data System (ADS)

    Subramanian, Vrishali; Semenzin, Elena; Hristozov, Danail; Zabeo, Alex; Malsch, Ineke; McAlea, Eamonn; Murphy, Finbarr; Mullins, Martin; van Harmelen, Toon; Ligthart, Tom; Linkov, Igor; Marcomini, Antonio

    2016-04-01

    The significant uncertainties associated with the (eco)toxicological risks of engineered nanomaterials pose challenges to the development of nano-enabled products toward greatest possible societal benefit. This paper argues for the use of risk governance approaches to manage nanotechnology risks and sustainability, and considers the links between these concepts. Further, seven risk assessment and management criteria relevant to risk governance are defined: (a) life cycle thinking, (b) triple bottom line, (c) inclusion of stakeholders, (d) risk management, (e) benefit-risk assessment, (f) consideration of uncertainty, and (g) adaptive response. These criteria are used to compare five well-developed nanotechnology frameworks: International Risk Governance Council framework, Comprehensive Environmental Assessment, Streaming Life Cycle Risk Assessment, Certifiable Nanospecific Risk Management and Monitoring System and LICARA NanoSCAN. A Sustainable Nanotechnology Decision Support System (SUNDS) is proposed to better address current nanotechnology risk assessment and management needs, and makes. Stakeholder needs were solicited for further SUNDS enhancement through a stakeholder workshop that included representatives from regulatory, industry and insurance sectors. Workshop participants expressed the need for the wider adoption of sustainability assessment methods and tools for designing greener nanomaterials.

  13. Risk management modeling and its application in maritime safety

    NASA Astrophysics Data System (ADS)

    Qin, Ting-Rong; Chen, Wei-Jiong; Zeng, Xiang-Kun

    2008-12-01

    Quantified risk assessment (QRA) needs mathematicization of risk theory. However, attention has been paid almost exclusively to applications of assessment methods, which has led to neglect of research into fundamental theories, such as the relationships among risk, safety, danger, and so on. In order to solve this problem, as a first step, fundamental theoretical relationships about risk and risk management were analyzed for this paper in the light of mathematics, and then illustrated with some charts. Second, man-machine-environment-management (MMEM) theory was introduced into risk theory to analyze some properties of risk. On the basis of this, a three-dimensional model of risk management was established that includes: a goal dimension; a management dimension; an operation dimension. This goal management operation (GMO) model was explained and then emphasis was laid on the discussion of the risk flowchart (operation dimension), which lays the groundwork for further study of risk management and qualitative and quantitative assessment. Next, the relationship between Formal Safety Assessment (FSA) and Risk Management was researched. This revealed that the FSA method, which the international maritime organization (IMO) is actively spreading, comes from Risk Management theory. Finally, conclusion were made about how to apply this risk management method to concrete fields efficiently and conveniently, as well as areas where further research is required.

  14. Racial disparities in BRCA testing and cancer risk management across a population-based sample of young breast cancer survivors.

    PubMed

    Cragun, Deborah; Weidner, Anne; Lewis, Courtney; Bonner, Devon; Kim, Jongphil; Vadaparampil, Susan T; Pal, Tuya

    2017-07-01

    Breast cancer (BC) disparities may widen with genomic advances. The authors compared non-Hispanic white (NHW), black, and Hispanic BC survivors for 1) cancer risk-management practices among BRCA carriers and 2) provider discussion and receipt of genetic testing. A population-based sample of NHW, black, and Hispanic women who had been diagnosed with invasive BC at age 50 years or younger from 2009 to 2012 were recruited through the state cancer registry. Multiple logistic regression was used to compare cancer risk-management practices in BRCA carriers and associations of demographic and clinical variables with provider discussion and receipt of testing. Of 1622 participants, 159 of 440 (36.1%) black women, 579 of 897 (64.5%) NHW women, 58 of 117 (49.6%) Spanish-speaking Hispanic women, and 116 of 168 (69%) English-speaking Hispanic women underwent BRCA testing, of whom 90 had a pathogenic BRCA mutation identified. Among BRCA carriers, the rates of risk-reducing mastectomy and risk-reducing salpingo-oophorectomy were significantly lower among black women compared with Hispanic and NHW women after controlling for clinical and demographic variables (P = .025 and P = .008, respectively). Compared with NHW women, discussion of genetic testing with a provider was 16 times less likely among black women (P < .0001) and nearly 2 times less likely among Spanish-speaking Hispanic women (P = .04) after controlling for clinical and sociodemographic factors. The current results suggest that the rates of risk-reducing salpingo-oophorectomy are lower among black BRCA carriers compared with their Hispanic and NHW counterparts, which is concerning because benefits from genetic testing arise from cancer risk-management practice options. Furthermore, lower BRCA testing rates among blacks may partially be because of a lower likelihood of provider discussion. Future studies are needed to improve cancer risk identification and management practices across all populations to prevent the

  15. Risk Management Issues When Taking Locum Tenens Assignments.

    PubMed

    Cash, Charles D

    2017-01-01

    This ongoing column is dedicated to providing information to our readers on managing legal risks associated with medical practice. We invite questions from our readers. The answers are provided by PRMS, Inc. (www.prms.com), a manager of medical professional liability insurance programs with services that include risk management consultation, education and onsite risk management audits, and other resources to healthcare providers to help improve patient outcomes and reduce professional liability risk. The answers published in this column represent those of only one risk management consulting company. Other risk management consulting companies or insurance carriers may provide different advice, and readers should take this into consideration. The information in this column does not constitute legal advice. For legal advice, contact your personal attorney. Note: The information and recommendations in this article are applicable to physicians and other healthcare professionals so "clinician" is used to indicate all treatment team members.

  16. The Evidence for a Risk-Based Approach to Australian Higher Education Regulation and Quality Assurance

    ERIC Educational Resources Information Center

    Edwards, Fleur

    2012-01-01

    This paper explores the nascent field of risk management in higher education, which is of particular relevance in Australia currently, as the Commonwealth Government implements its plans for a risk-based approach to higher education regulation and quality assurance. The literature outlines the concept of risk management and risk-based approaches…

  17. [Hospital risk management from the viewpoint of insurers].

    PubMed

    Gausmann, Peter; Petry, Franz Michael

    2004-10-01

    The present article deals with the significance of risk management in hospitals from the viewpoint of liability insurers. From the perspective of insurance companies, the liability risk of a hospital and its personnel has considerably increased during the past 25 years. The present risk situation is characterized by a growing number of reported liability cases, as well as by an enormous increase of average compensation claims. This development has led some insurance companies to financial deficits in the segment of hospital liability. While some insurers have withdrawn their activities from this market segment, others have reacted by raising their premiums. Since in Germany the premiums usually depend on the number of beds held by a hospital, the problem of rising premiums is exacerbated by the general increase of the number of clinical cases in the face of a parallel reduction of the number of beds. In the process of finding new criteria or methods for adequate premium calculation, a key role will be played by the individual future risk development of a hospital and by the evaluation of this risk by its insurance company. An extensive system of clinical quality management supported by elements of risk management will have persistent positive effects on the development of individual insurance premiums and on the insurability of clinical liability. Risk management is defined as the totality of measures taken by a company to identify risks that could lead to reduced success. Clinical risk management must be regarded in the context of a general trend that is not limited to the field of health service. In this process, the handling of errors and their causes plays a central role. Further variants of hospital risk management are the technical and economic risk management, both of which are increasingly important and are in part implemented in the German legislation. Clinical risk management has originated from the U.S., where as early as in the nineteen

  18. Presidential Commission on Risk Assessment and Risk Management

    EPA Science Inventory

    September 26, 1997. The Presidential/Congressional Commission on Risk Assessment and Risk Management, which was mandated as part of the Clean Air Act Amendments of 1990, was disbanded on August 31, 1997, with some staff work continuing into September. The reports and asso...

  19. Current approaches to cyanotoxin risk assessment and risk management around the globe.

    PubMed

    Ibelings, Bas W; Backer, Lorraine C; Kardinaal, W Edwin A; Chorus, Ingrid

    2015-12-01

    Toxic cyanobacteria became more widely recognized as a potential health hazard in the 1990s, and in 1998 the World Health Organization (WHO) first published a provisional Guideline Value of 1 μg L -1 for microcystin-LR in drinking-water. In this publication we compare risk assessment and risk management of toxic cyanobacteria in 17 countries across all five continents. We focus on the three main (oral) exposure vehicles to cyanotoxins: drinking-water, water related recreational and freshwater seafood. Most countries have implemented the provisional WHO Guideline Value, some as legally binding standard, to ensure the distribution of safe drinking-water with respect to microcystins. Regulation, however, also needs to address the possible presence of a wide range of other cyanotoxins and bioactive compounds, for which no guideline values can be derived due to insufficient toxicological data. The presence of microcystins (commonly expressed as microcystin-LR equivalents) may be used as proxy for overall guidance on risk management, but this simplification may miss certain risks, for instance from dissolved fractions of cylindrospermopsin and cyanobacterial neurotoxins. An alternative approach, often taken for risk assessment and management in recreational waters, is to regulate cyanobacterial presence - as cell numbers or biomass - rather than individual toxins. Here, many countries have implemented a two or three tier alert level system with incremental severity. These systems define the levels where responses are switched from Surveillance to Alert and finally to Action Mode and they specify the short-term actions that follow. Surface bloom formation is commonly judged to be a significant risk because of the elevated concentration of microcystins in a scum. Countries have based their derivations of legally binding standards, guideline values, maximally allowed concentrations (or limits named otherwise) on very similar scientific methodology, but underlying

  20. Current approaches to cyanotoxin risk assessment and risk management around the globe

    PubMed Central

    Ibelings, Bas W.; Backer, Lorraine C.; Kardinaal, W. Edwin A.; Chorus, Ingrid

    2015-01-01

    Toxic cyanobacteria became more widely recognized as a potential health hazard in the 1990s, and in 1998 the World Health Organization (WHO) first published a provisional Guideline Value of 1 μg L−1 for microcystin-LR in drinking-water. In this publication we compare risk assessment and risk management of toxic cyanobacteria in 17 countries across all five continents. We focus on the three main (oral) exposure vehicles to cyanotoxins: drinking-water, water related recreational and freshwater seafood. Most countries have implemented the provisional WHO Guideline Value, some as legally binding standard, to ensure the distribution of safe drinking-water with respect to microcystins. Regulation, however, also needs to address the possible presence of a wide range of other cyanotoxins and bioactive compounds, for which no guideline values can be derived due to insufficient toxicological data. The presence of microcystins (commonly expressed as microcystin-LR equivalents) may be used as proxy for overall guidance on risk management, but this simplification may miss certain risks, for instance from dissolved fractions of cylindrospermopsin and cyanobacterial neurotoxins. An alternative approach, often taken for risk assessment and management in recreational waters, is to regulate cyanobacterial presence – as cell numbers or biomass – rather than individual toxins. Here, many countries have implemented a two or three tier alert level system with incremental severity. These systems define the levels where responses are switched from Surveillance to Alert and finally to Action Mode and they specify the short-term actions that follow. Surface bloom formation is commonly judged to be a significant risk because of the elevated concentration of microcystins in a scum. Countries have based their derivations of legally binding standards, guideline values, maximally allowed concentrations (or limits named otherwise) on very similar scientific methodology, but underlying

  1. The Role of Risk and Risk Management in Experiential Education.

    ERIC Educational Resources Information Center

    Mobley, Michael

    A monograph examines the role of risk and risk management in experiential education, particularly stress/challenge programming. Definitions of risk are presented. The importance of risk and stress in experiential education is emphasized. Implications of subjective versus objective risk assessment in adventure education are discussed, with…

  2. Cost-effectiveness of a nurse-led internet-based vascular risk factor management programme: economic evaluation alongside a randomised controlled clinical trial.

    PubMed

    Greving, J P; Kaasjager, H A H; Vernooij, J W P; Hovens, M M C; Wierdsma, J; Grandjean, H M H; van der Graaf, Y; de Wit, G A; Visseren, F L J

    2015-05-20

    To assess the cost-effectiveness of an internet-based, nurse-led vascular risk factor management programme in addition to usual care compared with usual care alone in patients with a clinical manifestation of a vascular disease. Cost-effectiveness analysis alongside a randomised controlled trial (the Internet-based vascular Risk factor Intervention and Self-management (IRIS) study). Multicentre trial in a secondary and tertiary healthcare setting. 330 patients with a recent clinical manifestation of atherosclerosis in the coronary, cerebral, or peripheral arteries and with ≥2 treatable vascular risk factors not at goal. The intervention consisted of a personalised website with an overview and actual status of patients' vascular risk factors, and mail communication with a nurse practitioner via the website for 12 months. The intervention combined self-management support, monitoring of disease control and pharmacotherapy. Societal costs, quality-adjusted life-years (QALYs) and incremental cost-effectiveness. Patients experienced equal health benefits, that is, 0.86 vs 0.85 QALY (intervention vs usual care) at 1 year. Adjusting for baseline differences, the incremental QALY difference was -0.014 (95% CI -0.034 to 0.007). The intervention was associated with lower total costs (€4859 vs €5078, difference €219, 95% CI -€2301 to €1825). The probability that the intervention is cost-effective at a threshold value of €20,000/QALY, is 65%. At mean annual cost of €220 per patient, the intervention is relatively cheap. An internet-based, nurse-led intervention in addition to usual care to improve vascular risk factors in patients with a clinical manifestation of a vascular disease does not result in a QALY gain at 1 year, but has a small effect on vascular risk factors and is associated with lower costs. NCT00785031. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  3. Cost-effectiveness of a nurse-led internet-based vascular risk factor management programme: economic evaluation alongside a randomised controlled clinical trial

    PubMed Central

    Greving, J P; Kaasjager, H A H; Vernooij, J W P; Hovens, M M C; Wierdsma, J; Grandjean, H M H; van der Graaf, Y; de Wit, G A; Visseren, F L J

    2015-01-01

    Objective To assess the cost-effectiveness of an internet-based, nurse-led vascular risk factor management programme in addition to usual care compared with usual care alone in patients with a clinical manifestation of a vascular disease. Design Cost-effectiveness analysis alongside a randomised controlled trial (the Internet-based vascular Risk factor Intervention and Self-management (IRIS) study). Setting Multicentre trial in a secondary and tertiary healthcare setting. Participants 330 patients with a recent clinical manifestation of atherosclerosis in the coronary, cerebral, or peripheral arteries and with ≥2 treatable vascular risk factors not at goal. Intervention The intervention consisted of a personalised website with an overview and actual status of patients’ vascular risk factors, and mail communication with a nurse practitioner via the website for 12 months. The intervention combined self-management support, monitoring of disease control and pharmacotherapy. Main outcome measures Societal costs, quality-adjusted life-years (QALYs) and incremental cost-effectiveness. Results Patients experienced equal health benefits, that is, 0.86 vs 0.85 QALY (intervention vs usual care) at 1 year. Adjusting for baseline differences, the incremental QALY difference was −0.014 (95% CI −0.034 to 0.007). The intervention was associated with lower total costs (€4859 vs €5078, difference €219, 95% CI −€2301 to €1825). The probability that the intervention is cost-effective at a threshold value of €20 000/QALY, is 65%. At mean annual cost of €220 per patient, the intervention is relatively cheap. Conclusions An internet-based, nurse-led intervention in addition to usual care to improve vascular risk factors in patients with a clinical manifestation of a vascular disease does not result in a QALY gain at 1 year, but has a small effect on vascular risk factors and is associated with lower costs. Trial registration number NCT00785031. PMID

  4. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  5. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  6. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  7. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  8. Application of Risk Assessment Tools in the Continuous Risk Management (CRM) Process

    NASA Technical Reports Server (NTRS)

    Ray, Paul S.

    2002-01-01

    Marshall Space Flight Center (MSFC) of the National Aeronautics and Space Administration (NASA) is currently implementing the Continuous Risk Management (CRM) Program developed by the Carnegie Mellon University and recommended by NASA as the Risk Management (RM) implementation approach. The four most frequently used risk assessment tools in the center are: (a) Failure Modes and Effects Analysis (FMEA), Hazard Analysis (HA), Fault Tree Analysis (FTA), and Probabilistic Risk Analysis (PRA). There are some guidelines for selecting the type of risk assessment tools during the project formulation phase of a project, but there is not enough guidance as to how to apply these tools in the Continuous Risk Management process (CRM). But the ways the safety and risk assessment tools are used make a significant difference in the effectiveness in the risk management function. Decisions regarding, what events are to be included in the analysis, to what level of details should the analysis be continued, make significant difference in the effectiveness of risk management program. Tools of risk analysis also depends on the phase of a project e.g. at the initial phase of a project, when not much data are available on hardware, standard FMEA cannot be applied; instead a functional FMEA may be appropriate. This study attempted to provide some directives to alleviate the difficulty in applying FTA, PRA, and FMEA in the CRM process. Hazard Analysis was not included in the scope of the study due to the short duration of the summer research project.

  9. 7 CFR 760.104 - Risk management purchase requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 7 2011-01-01 2011-01-01 false Risk management purchase requirements. 760.104 Section... Agricultural Disaster Assistance Programs § 760.104 Risk management purchase requirements. (a) To be eligible... available from the USDA Risk Management Agency (RMA)) obtained catastrophic coverage or better under a...

  10. 7 CFR 760.104 - Risk management purchase requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Risk management purchase requirements. 760.104 Section... Agricultural Disaster Assistance Programs § 760.104 Risk management purchase requirements. (a) To be eligible... available from the USDA Risk Management Agency (RMA)) obtained catastrophic coverage or better under a...

  11. Risk Management Issues When Taking Locum Tenens Assignments

    PubMed Central

    Cash, Charles D.

    2017-01-01

    This ongoing column is dedicated to providing information to our readers on managing legal risks associated with medical practice. We invite questions from our readers. The answers are provided by PRMS, Inc. (www.prms.com), a manager of medical professional liability insurance programs with services that include risk management consultation, education and onsite risk management audits, and other resources to healthcare providers to help improve patient outcomes and reduce professional liability risk. The answers published in this column represent those of only one risk management consulting company. Other risk management consulting companies or insurance carriers may provide different advice, and readers should take this into consideration. The information in this column does not constitute legal advice. For legal advice, contact your personal attorney. Note: The information and recommendations in this article are applicable to physicians and other healthcare professionals so “clinician” is used to indicate all treatment team members. PMID:28386523

  12. Efficient GIS-based model-driven method for flood risk management and its application in central China

    NASA Astrophysics Data System (ADS)

    Liu, Y.; Zhou, J.; Song, L.; Zou, Q.; Guo, J.; Wang, Y.

    2014-02-01

    In recent years, an important development in flood management has been the focal shift from flood protection towards flood risk management. This change greatly promoted the progress of flood control research in a multidisciplinary way. Moreover, given the growing complexity and uncertainty in many decision situations of flood risk management, traditional methods, e.g., tight-coupling integration of one or more quantitative models, are not enough to provide decision support for managers. Within this context, this paper presents a beneficial methodological framework to enhance the effectiveness of decision support systems, through the dynamic adaptation of support regarding the needs of the decision-maker. In addition, we illustrate a loose-coupling technical prototype for integrating heterogeneous elements, such as multi-source data, multidisciplinary models, GIS tools and existing systems. The main innovation is the application of model-driven concepts, which put the system in a state of continuous iterative optimization. We define the new system as a model-driven decision support system (MDSS ). Two characteristics that differentiate the MDSS are as follows: (1) it is made accessible to non-technical specialists; and (2) it has a higher level of adaptability and compatibility. Furthermore, the MDSS was employed to manage the flood risk in the Jingjiang flood diversion area, located in central China near the Yangtze River. Compared with traditional solutions, we believe that this model-driven method is efficient, adaptable and flexible, and thus has bright prospects of application for comprehensive flood risk management.

  13. Climate Change Risk Management: CRE Adaptation Projects and the Risk Management Process

    EPA Pesticide Factsheets

    This document describes National Estuary Program partner projects that demonstrate how risk management can be successfully applied to address environmental challenges in our country’s coastal areas.

  14. [Clinical risk management in german hospitals - does size really matter?].

    PubMed

    Bohnet-Joschko, S; Jandeck, L M; Zippel, C; Andersen, M; Krummenauer, F

    2011-06-01

    management, 92 % of the hospitals see potential for internal improvement; 44 % have already communicated with external consultants. While identification of clinical risks with near miss and other incident reporting systems meets increasing acceptance, the learning potential based on incident reporting is not yet appropriately being used. There is a deficit regarding systematic and comprehensive risk assessment and controlling; this will have to be met by improving the organisational framework for clinical risk management. © Georg Thieme Verlag KG Stuttgart · New York.

  15. Benchmarking Outdoor Expeditionary Program Risk Management Strategies

    ERIC Educational Resources Information Center

    Meerts-Brandsma, Lisa; Furman, Nate; Sibthorp, Jim

    2017-01-01

    In 2003, the University of Utah and the National Outdoor Leadership School (NOLS) completed a study that developed a risk management taxonomy in the outdoor adventure industry and assessed how different outdoor expeditionary programs (OEPs) managed risk (Szolosi, Sibthorp, Paisley, & Gookin, 2003). By unifying the language around risk, the…

  16. Taking Risk Assessment and Management to the Next Level: Program-Level Risk Analysis to Enable Solid Decision-Making on Priorities and Funding

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, J. G.; Morton, R. L.; Castillo, C.

    2011-02-01

    A multi-level (facility and programmatic) risk assessment was conducted for the facilities in the Nevada National Security Site (NNSS) Readiness in Technical Base and Facilities (RTBF) Program and results were included in a new Risk Management Plan (RMP), which was incorporated into the fiscal year (FY) 2010 Integrated Plans. Risks, risk events, probability, consequence(s), and mitigation strategies were identified and captured, for most scope areas (i.e., risk categories) during the facilitated risk workshops. Risk mitigations (i.e., efforts in addition to existing controls) were identified during the facilitated risk workshops when the risk event was identified. Risk mitigation strategies fell intomore » two broad categories: threats or opportunities. Improvement projects were identified and linked to specific risks they mitigate, making the connection of risk reduction through investments for the annual Site Execution Plan. Due to the amount of that was collected, analysis to be performed, and reports to be generated, a Risk Assessment/ Management Tool (RAMtool) database was developed to analyze the risks in real-time, at multiple levels, which reinforced the site-level risk management process and procedures. The RAMtool database was developed and designed to assist in the capturing and analysis of the key elements of risk: probability, consequence, and impact. The RAMtool calculates the facility-level and programmatic-level risk factors to enable a side-by-side comparison to see where the facility manager and program manager should focus their risk reduction efforts and funding. This enables them to make solid decisions on priorities and funding to maximize the risk reduction. A more active risk management process was developed where risks and opportunities are actively managed, monitored, and controlled by each facility more aggressively and frequently. risk owners have the responsibility and accountability to manage their assigned risk in real-time, using

  17. Risk taking and effective R&D management.

    PubMed

    Banholzer, William F; Vosejpka, Laura J

    2011-01-01

    Several key strategies can be used to manage the risk associated with innovation to create maximum value. These include balancing the timing of investments versus cash flows, management of fads, prioritization across the company, savvy portfolio management, and a system of metrics that measure real success. Successful R&D managers will do whatever is necessary to manage the risks associated with an R&D program and stick to their long-term strategy.

  18. 2015/2016 Quality Risk Management Benchmarking Survey.

    PubMed

    Waldron, Kelly; Ramnarine, Emma; Hartman, Jeffrey

    2017-01-01

    This paper investigates the concept of quality risk management (QRM) maturity as it applies to the pharmaceutical and biopharmaceutical industries, using the results and analysis from a QRM benchmarking survey conducted in 2015 and 2016. QRM maturity can be defined as the effectiveness and efficiency of a quality risk management program, moving beyond "check-the-box" compliance with guidelines such as ICH Q9 Quality Risk Management , to explore the value QRM brings to business and quality operations. While significant progress has been made towards full adoption of QRM principles and practices across industry, the full benefits of QRM have not yet been fully realized. The results of the QRM Benchmarking Survey indicate that the pharmaceutical and biopharmaceutical industries are approximately halfway along the journey towards full QRM maturity. LAY ABSTRACT: The management of risks associated with medicinal product quality and patient safety are an important focus for the pharmaceutical and biopharmaceutical industries. These risks are identified, analyzed, and controlled through a defined process called quality risk management (QRM), which seeks to protect the patient from potential quality-related risks. This paper summarizes the outcomes of a comprehensive survey of industry practitioners performed in 2015 and 2016 that aimed to benchmark the level of maturity with regard to the application of QRM. The survey results and subsequent analysis revealed that the pharmaceutical and biopharmaceutical industries have made significant progress in the management of quality risks over the last ten years, and they are roughly halfway towards reaching full maturity of QRM. © PDA, Inc. 2017.

  19. Pediatric Dental Care: Prevention and Management Protocols Based on Caries Risk Assessment

    PubMed Central

    RAMOS-GOMEZ, FRANCISCO J.; CRYSTAL, YASMI O.; NG, MAN WAI; CRALL, JAMES J.; FEATHERSTONE, JOHN D.B.

    2012-01-01

    Recent increases in caries prevalence in young children, especially among minorities and the economically disadvantaged, highlight the need for early establishment of dental homes and simple, effective infant oral care preventive programs for all children as part of a medical disease prevention management model.1–3 This article presents an updated approach and practical tools for pediatric dental caries management by risk assessment, CAMBRA, in an effort to stimulate greater adoption of infant oral care programs among clinicians and early establishment of dental homes for young children. PMID:21162350

  20. MERINOVA: Meteorological risks as drivers of environmental innovation in agro-ecosystem management

    NASA Astrophysics Data System (ADS)

    Gobin, Anne; Oger, Robert; Marlier, Catherine; Van De Vijver, Hans; Vandermeulen, Valerie; Van Huylenbroeck, Guido; Zamani, Sepideh; Curnel, Yannick; Mettepenningen, Evi

    2013-04-01

    The BELSPO funded project 'MERINOVA' deals with risks associated with extreme weather phenomena and with risks of biological origin such as pests and diseases. The major objectives of the proposed project are to characterise extreme meteorological events, assess the impact on Belgian agro-ecosystems, characterise their vulnerability and resilience to these events, and explore innovative adaptation options to agricultural risk management. The project comprises of five major parts that reflect the chain of risks: (i) Hazard: Assessing the likely frequency and magnitude of extreme meteorological events by means of probability density functions; (ii) Impact: Analysing the potential bio-physical and socio-economic impact of extreme weather events on agro-ecosystems in Belgium using process-based modelling techniques commensurate with the regional scale; (iii) Vulnerability: Identifying the most vulnerable agro-ecosystems using fuzzy multi-criteria and spatial analysis; (iv) Risk Management: Uncovering innovative risk management and adaptation options using actor-network theory and fuzzy cognitive mapping techniques; and, (v) Communication: Communicating to research, policy and practitioner communities using web-based techniques. The different tasks of the MERINOVA project require expertise in several scientific disciplines: meteorology, statistics, spatial database management, agronomy, bio-physical impact modelling, socio-economic modelling, actor-network theory, fuzzy cognitive mapping techniques. These expertises are shared by the four scientific partners who each lead one work package. The MERINOVA project will concentrate on promoting a robust and flexible framework by demonstrating its performance across Belgian agro-ecosystems, and by ensuring its relevance to policy makers and practitioners. Impacts developed from physically based models will not only provide information on the state of the damage at any given time, but also assist in understanding the links

  1. Today's School Risk Manager

    ERIC Educational Resources Information Center

    Johnson, Cheryl P.; Levering, Steve

    2009-01-01

    School districts are held accountable not only for the monies that contribute to the education system but also for mitigating any issues that threaten student learning. Some school districts are fortunate to have professional risk managers on staff who can identify and control the many risks that are unique to school systems. Most schools,…

  2. Human System Risk Management for Space Flight

    NASA Technical Reports Server (NTRS)

    Davis, Jeffrey

    2015-01-01

    This brief abstract reviews the development of the current day approach to human system risk management for space flight and the development of the critical components of this process over the past few years. The human system risk management process now provides a comprehensive assessment of each human system risk by design reference mission (DRM) and is evaluated not only for mission success but also for long-term health impacts for the astronauts. The discipline of bioastronautics is the study of the biological and medical effects of space flight on humans. In 1997, the Space Life Sciences Directorate (SLSD) initiated the Bioastronautics Roadmap (Roadmap) as the "Critical Path Roadmap", and in 1998 participation in the roadmap was expanded to include the National Space Biomedical Research Institute (NSBRI) and the external community. A total of 55 risks and 250 questions were identified and prioritized and in 2000, the Roadmap was base-lined and put under configuration control. The Roadmap took into account several major advisory committee reviews including the Institute of Medicine (IOM) "Safe Passage: Astronaut care for Exploration Missions", 2001. Subsequently, three collaborating organizations at NASA HQ (Chief Health and Medical Officer, Office of Space Flight and Office of Biological & Physical Research), published the Bioastronautics Strategy in 2003, that identified the human as a "critical subsystem of space flight" and noted that "tolerance limits and safe operating bands must be established" to enable human space flight. These offices also requested a review by the IOM of the Roadmap and that review was published in October 2005 as "A Risk Reduction Strategy for Human Exploration of Space: A Review of NASA's Bioastronautics Roadmap", that noted several strengths and weaknesses of the Roadmap and made several recommendations. In parallel with the development of the Roadmap, the Office of the Chief Health and Medical Officer (OCHMO) began a process in

  3. Managing Risk in Systems Development.

    ERIC Educational Resources Information Center

    DePaoli, Marilyn M.; And Others

    Stanford University's use of a risk assessment methodology to improve the management of systems development projects is discussed. After examining the concepts of hazard, peril, and risk as they relate to the system development process, three ways to assess risk are covered: size, structure, and technology. The overall objective for Stanford…

  4. Risk based inspection for atmospheric storage tank

    NASA Astrophysics Data System (ADS)

    Nugroho, Agus; Haryadi, Gunawan Dwi; Ismail, Rifky; Kim, Seon Jin

    2016-04-01

    Corrosion is an attack that occurs on a metallic material as a result of environment's reaction.Thus, it causes atmospheric storage tank's leakage, material loss, environmental pollution, equipment failure and affects the age of process equipment then finally financial damage. Corrosion risk measurement becomesa vital part of Asset Management at the plant for operating any aging asset.This paper provides six case studies dealing with high speed diesel atmospheric storage tank parts at a power plant. A summary of the basic principles and procedures of corrosion risk analysis and RBI applicable to the Process Industries were discussed prior to the study. Semi quantitative method based onAPI 58I Base-Resource Document was employed. The risk associated with corrosion on the equipment in terms of its likelihood and its consequences were discussed. The corrosion risk analysis outcome used to formulate Risk Based Inspection (RBI) method that should be a part of the atmospheric storage tank operation at the plant. RBI gives more concern to inspection resources which are mostly on `High Risk' and `Medium Risk' criteria and less on `Low Risk' shell. Risk categories of the evaluated equipment were illustrated through case study analysis outcome.

  5. Primary care physician management, referral, and relations with specialists concerning patients at risk for cancer due to family history.

    PubMed

    Wood, M E; Flynn, B S; Stockdale, A

    2013-01-01

    Risk stratification based on family history is a feature of screening guidelines for a number of cancers and referral guidelines for genetic counseling/testing for cancer risk. Our aim was to describe primary care physician perceptions of their role in managing cancer risk based on family history. Structured interviews were conducted by a medical anthropologist with primary care physicians in 3 settings in 2 north-eastern states. Transcripts were systematically analyzed by a research team to identify major themes expressed by participants. Forty interviews were conducted from May 2003 through May 2006. Physicians provided a diversity of views on roles in management of cancer risk based on family history, management practices and patient responses to risk information. They also provided a wide range of perspectives on criteria used for referral to specialists, types of specialists referred to and expected management roles for referred patients. Some primary care physicians appeared to make effective use of family history information for cancer risk management, but many in this sample did not. Increased focus on efficient assessment tools based on recognized guidelines, accessible guides to management options, and patient education and decision aids may be useful directions to facilitate broader use of family history information for cancer risk management. Copyright © 2013 S. Karger AG, Basel.

  6. [MANAGEMENT OF HEALTHCARE WASTE IN THE HOSPITAL SETTING. UNDERSTANDING RISK MANAGEMENT].

    PubMed

    Galimany-Masclans, Jordi; Torres-Egea, Pilar; Sancho-Agredano, Raúl; Girbau-García, Ma Rosa; Fabrellas, Núria; Torrens-Garcia, Ma Llum; Martínez-Estalella, Gemma

    2015-05-01

    The sanitary waste represents a potential hazard for health workers. Given the high risk of infection in labor accidents, the correct management of sanitary waste minimizes this risk and improves labor and environment conditions. To identify risk perception with health professionals in relation to the advanced sorting and management of healthcare waste (HW). The current study is a descriptive, cross-sectional. The sample size was 177 health workers (nurse assistants, nurses, physicians, lab technicians) from three hospitals in Barcelona (Catalonia). Homemade questionnaire and questions with a free and spontaneous association and incomplete sentences were used to analyze labor variables, perception of risk and personal security through a Likert scale. Using a score from 1 (the lowest perception of risk) to 5 (the high perception of risk) to assess the risk perception, the average value for nurse assistants, nurses, physicians, and lab technicians was 3.71, 3.75, 3.83 and 4.03, respectively. Referring to items with free and spontaneous response association, 44.8% of workers consider HW as a biohazard, 29.6% consider it as waste material, 22.1% state that it must be managed properly and 3.5% described it as unknown residues. The results suggest that all health professionals generally have a perception of high risk. The lab technicians have a higher perception of the real risk of inadequate management of HW A 63.2% report that everyone has to make a proper management to preserve their occupational health; the 59% consider that the HW are a biological risk to the general population and only the 47.8% that are harmful to public health. Although it should be noted that only 44.8% think that HW are toxic and dangerous.

  7. A review of recent advances in risk analysis for wildfire management

    Treesearch

    Carol Miller; Alan A. Ager

    2012-01-01

    Risk analysis evolved out of the need to make decisions concerning highly stochastic events, and is well suited to analyze the timing, location and potential effects of wildfires. Over the past 10 years, the application of risk analysis to wildland fire management has seen steady growth with new risk-based analytical tools that support a wide range of fire and fuels...

  8. Risk-based remediation of polluted sites: A critical perspective.

    PubMed

    Kuppusamy, Saranya; Venkateswarlu, Kadiyala; Megharaj, Mallavarapu; Mayilswami, Srinithi; Lee, Yong Bok

    2017-11-01

    Sites contaminated with chemical pollutants represent a growing challenge, and remediation of such lands is of international concern. Risk-based land management (RBLM) is an emerging approach that integrates risk assessment practices with more traditional site-specific investigations and remediation activities. Developing countries are yet to adopt RBLM strategies for remediation. RBLM is considered to be practical, scientifically defensible and cost-efficient. However, it is inherently limited by: firstly, the accuracy of risk assessment models used; secondly, ramifications of the fact that they are more likely to leave contamination in place; and thirdly, uncertainties involved and having to consider the total concentrations of all contaminants in soils that overestimate the potential risks from exposure to the contaminants. Consideration of contaminant bioavailability as the underlying basis for risk assessment and setting remediation goals of those contaminated lands that pose a risk to environmental and human health may lead to the development of a more sophisticated risk-based approach. However, employing the bioavailability concept in RBLM has not been extensively studied and/or legalized. This review highlights the extent of global land contamination, and the concept of risk-based assessment and management of contaminated sites including its advantages and disadvantages. Furthermore, the concept of bioavailability-based RBLM strategy has been proposed, and the challenges of RBLM and the priority areas for future research are summarized. Thus, the present review may help achieve a better understanding and successful implementation of a sustainable bioavailability-based RBLM strategy. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. Pain management and opioid risk mitigation in the military.

    PubMed

    Sharpe Potter, Jennifer; Bebarta, Vikhyat S; Marino, Elise N; Ramos, Rosemarie G; Turner, Barbara J

    2014-05-01

    Opioid analgesics misuse is a significant military health concern recognized as a priority issue by military leadership. Opioids are among those most commonly prescribed medications in the military for pain management. The military has implemented opioid risk mitigation strategies, including the Sole Provider Program and the Controlled Drug Management Analysis and Reporting Tool, which are used to identify and monitor for risk and misuse. However, there are substantial opportunities to build on these existing systems to better ensure safer opioid prescribing and monitor for misuse. Opioid risk mitigation strategies implemented by the civilian sector include establishing clinical guidelines for opioid prescribing and prescription monitoring programs. These strategies may help to inform opioid risk mitigation in the military health system. Reducing the risk of opioid misuse and improving quality of care for our Warfighters is necessary. This must be done through evidence-based approaches with an investment in research to improve patient care and prevent opioid misuse as well as its sequelae. Reprint & Copyright © 2014 Association of Military Surgeons of the U.S.

  10. The effectiveness of risk management: an analysis of project risk planning across industries and countries.

    PubMed

    Zwikael, Ofer; Ahn, Mark

    2011-01-01

    This article examines the effectiveness of current risk management practices to reduce project risk using a multinational, multi-industry study across different scenarios and cultures. A survey was administered to 701 project managers, and their supervisors, in seven industries and three diverse countries (New Zealand, Israel, and Japan), in multiple languages during the 2002-2007 period. Results of this study show that project context--industry and country where a project is executed--significantly impacts perceived levels of project risk, and the intensity of risk management processes. Our findings also suggest that risk management moderates the relationship between risk level and project success. Specifically, we found that even moderate levels of risk management planning are sufficient to reduce the negative effect risk levels have on project success. © 2010 Society for Risk Analysis.

  11. Managing Programmatic Risk for Complex Space System Developments

    NASA Technical Reports Server (NTRS)

    Panetta, Peter V.; Hastings, Daniel; Brumfield, Mark (Technical Monitor)

    2001-01-01

    Risk management strategies have become a recent important research topic to many aerospace organizations as they prepare to develop the revolutionary complex space systems of the future. Future multi-disciplinary complex space systems will make it absolutely essential for organizations to practice a rigorous, comprehensive risk management process, emphasizing thorough systems engineering principles to succeed. Project managers must possess strong leadership skills to direct high quality, cross-disciplinary teams for successfully developing revolutionary space systems that are ever increasing in complexity. Proactive efforts to reduce or eliminate risk throughout a project's lifecycle ideally must be practiced by all technical members in the organization. This paper discusses some of the risk management perspectives that were collected from senior managers and project managers of aerospace and aeronautical organizations by the use of interviews and surveys. Some of the programmatic risks which drive the success or failure of projects are revealed. Key findings lead to a number of insights for organizations to consider for proactively approaching the risks which face current and future complex space systems projects.

  12. Towards risk-based drought management in the Netherlands: making water supply levels transparent to water users

    NASA Astrophysics Data System (ADS)

    Maat Judith, Ter; Marjolein, Mens; Vuren Saskia, Van; der Vat Marnix, Van

    2016-04-01

    Improving Predictions and Management of Hydrological Extremes (IMPREX), running from 2016-2019, a consortium of the Dutch research institute Deltares and the Dutch water management consultant HKV will design and build a tool to support quantitative risk-informed decision-making for fresh water management for the Netherlands, in particular the decision on water supply service levels. The research will be conducted in collaboration with the Dutch Ministry for Infrastructure and Environment, the Freshwater Supply Programme Office, the Dutch governmental organisation responsible for water management (Rijkswaterstaat), the Foundation for Applied Water Research, (STOWA, knowledge centre of the water boards) and a number of water boards. In the session we will present the conceptual framework for a risk-based approach for water shortage management and share thoughts on how the proposed tool can be applied in the Dutch water management context.

  13. Risk evaluation of highway engineering project based on the fuzzy-AHP

    NASA Astrophysics Data System (ADS)

    Yang, Qian; Wei, Yajun

    2011-10-01

    Engineering projects are social activities, which integrate with technology, economy, management and organization. There are uncertainties in each respect of engineering projects, and it needs to strengthen risk management urgently. Based on the analysis of the characteristics of highway engineering, and the study of the basic theory on risk evaluation, the paper built an index system of highway project risk evaluation. Besides based on fuzzy mathematics principle, analytical hierarchy process was used and as a result, the model of the comprehensive appraisal method of fuzzy and AHP was set up for the risk evaluation of express way concessionary project. The validity and the practicability of the risk evaluation of expressway concessionary project were verified after the model was applied to the practice of a project.

  14. Research and development supporting risk-based wildfire effects prediction for fuels and fire management: Status and needs

    Treesearch

    Kevin Hyde; Matthew B. Dickinson; Gil Bohrer; David Calkin; Louisa Evers; Julie Gilbertson-Day; Tessa Nicolet; Kevin Ryan; Christina Tague

    2013-01-01

    Wildland fire management has moved beyond a singular focus on suppression, calling for wildfire management for ecological benefit where no critical human assets are at risk. Processes causing direct effects and indirect, long-term ecosystem changes are complex and multidimensional. Robust risk-assessment tools are required that account for highly variable effects on...

  15. 12 CFR 652.30 - Interest rate risk management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 7 2014-01-01 2014-01-01 false Interest rate risk management. 652.30 Section... CORPORATION FUNDING AND FISCAL AFFAIRS § 652.30 Interest rate risk management. (a) The board of directors of... management and must be knowledgeable of the nature and level of interest rate risk taken by Farmer Mac. (b...

  16. HACCP-based quality risk management approach to udder health problems on dairy farms

    PubMed Central

    2009-01-01

    Against the background of prevailing udder health problems on dairy farms, this paper discusses a new approach to mastitis control. Current udder health control programmes, such as the 'five-point plan', are highlighted and their drawbacks indicated. The concept and principles of hazard analysis critical control points (HACCP) are introduced. The eight core elements of this concept are dealt with by using the example of a dairy herd with a mastitis problem due to Staphylococcus aureus. The various steps to be taken in the development of a HACCP-based quality risk management programme are illustrated through the application of core elements. Finally, it is shown that the HACCP key words, structure, organisation, planning, communication and formalisation; which do not frequently appear in conventional herd health and production management programmes can contribute to better udder health. The role of the veterinarian can be paramount and of added value, if he/she is willing to invest in new knowledge and skills, such as the HACCP concept, farm economics, animal nutrition, and particularly the role of coach to the dairy farmer in the implementation of preventative measures in relation to udder health. PMID:22082372

  17. HACCP-based quality risk management approach to udder health problems on dairy farms.

    PubMed

    Noordhuizen, Jptm; Cannas da Silva, J

    2009-04-01

    Against the background of prevailing udder health problems on dairy farms, this paper discusses a new approach to mastitis control. Current udder health control programmes, such as the 'five-point plan', are highlighted and their drawbacks indicated. The concept and principles of hazard analysis critical control points (HACCP) are introduced. The eight core elements of this concept are dealt with by using the example of a dairy herd with a mastitis problem due to Staphylococcus aureus. The various steps to be taken in the development of a HACCP-based quality risk management programme are illustrated through the application of core elements. Finally, it is shown that the HACCP key words, structure, organisation, planning, communication and formalisation; which do not frequently appear in conventional herd health and production management programmes can contribute to better udder health. The role of the veterinarian can be paramount and of added value, if he/she is willing to invest in new knowledge and skills, such as the HACCP concept, farm economics, animal nutrition, and particularly the role of coach to the dairy farmer in the implementation of preventative measures in relation to udder health.

  18. Supply chain risk management of newspaper industry: A quantitative study

    NASA Astrophysics Data System (ADS)

    Sartika, Viny; Hisjam, Muh.; Sutopo, Wahyudi

    2018-02-01

    The newspaper industry has several distinctive features that make it stands out from other industries. The strict delivery deadline and zero inventory led to a very short time frame for production and distribution. On the other hand, there is pressure from the newsroom to encourage the start of production as slowly as possible in order to enter the news, while there is pressure from production and distribution to start production as early as possible. Supply chain risk management is needed in determining the best strategy for dealing with possible risks in the newspaper industry. In a case study of a newspaper in Surakarta, quantitative approaches are made to the newspaper supply chain risk management by calculating the expected cost of risk based on the magnitude of the impact and the probability of a risk event. From the calculation results obtained that the five risks with the highest value are newspaper delays to the end customer, broken plate, miss print, down machine, and delayed delivery of newspaper content. Then analyzed appropriate mitigation strategies to cope with such risk events.

  19. A risk assessment methodology to evaluate the risk failure of managed aquifer recharge in the Mediterranean Basin

    NASA Astrophysics Data System (ADS)

    Rodríguez-Escales, Paula; Canelles, Arnau; Sanchez-Vila, Xavier; Folch, Albert; Kurtzman, Daniel; Rossetto, Rudy; Fernández-Escalante, Enrique; Lobo-Ferreira, João-Paulo; Sapiano, Manuel; San-Sebastián, Jon; Schüth, Christoph

    2018-06-01

    Managed aquifer recharge (MAR) can be affected by many risks. Those risks are related to different technical and non-technical aspects of recharge, like water availability, water quality, legislation, social issues, etc. Many other works have acknowledged risks of this nature theoretically; however, their quantification and definition has not been developed. In this study, the risk definition and quantification has been performed by means of fault trees and probabilistic risk assessment (PRA). We defined a fault tree with 65 basic events applicable to the operation phase. After that, we have applied this methodology to six different managed aquifer recharge sites located in the Mediterranean Basin (Portugal, Spain, Italy, Malta, and Israel). The probabilities of the basic events were defined by expert criteria, based on the knowledge of the different managers of the facilities. From that, we conclude that in all sites, the perception of the expert criteria of the non-technical aspects were as much or even more important than the technical aspects. Regarding the risk results, we observe that the total risk in three of the six sites was equal to or above 0.90. That would mean that the MAR facilities have a risk of failure equal to or higher than 90 % in the period of 2-6 years. The other three sites presented lower risks (75, 29, and 18 % for Malta, Menashe, and Serchio, respectively).

  20. Progress of environmental management and risk assessment of industrial chemicals in China.

    PubMed

    Wang, Hong; Yan, Zhen-Guang; Li, Hong; Yang, Ni-Yun; Leung, Kenneth M Y; Wang, Yi-Zhe; Yu, Ruo-Zhen; Zhang, Lai; Wang, Wan-Hua; Jiao, Cong-Ying; Liu, Zheng-Tao

    2012-06-01

    With China's rapid economic growth, chemical-related environmental issues have become increasingly prominent, and the environmental management of chemicals has garnered increased attention from the government. This review focuses on the current situation and the application of risk assessment in China's environmental management of industrial chemicals. The related challenges and research needs of the country are also discussed. The Chinese government promulgated regulations for the import and export of toxic chemicals in 1994. Regulations for new chemical substances came into force in 2003, and were revised in 2010 based on the concept of risk management. In order to support the implementation of new regulations, Guidance for Risk Assessment of Chemicals is under development in an attempt to provide the concepts and techniques of risk assessment. With increasing concern and financial support from Chinese government, China is embarking on the fast track of research and development in environmental management of industrial chemicals. Copyright © 2011 Elsevier Ltd. All rights reserved.

  1. Climate Change Risk Management Consulting: The opportunity for an independent business practice

    NASA Astrophysics Data System (ADS)

    Ciccozzi, R.

    2009-04-01

    The Paper outlines the main questions to be addressed with reference to the actual demand of climate change risk management consulting, in the financial services. Moreover, the Project shall also try to investigate if the Catastrophe Modelling Industry can start and manage a business practice specialised on climate change risk exposures. In this context, the Paper aims at testing the possibility to build a sound business case, based upon typical MBA course analysis tools, such as PEST(LE), SWOT, etc. Specific references to the tools to be used and to other contribution from academic literature and general documentation are also discussed in the body of the Paper and listed at the end. The analysis shall also focus on the core competencies required for an independent climate change risk management consulting business practice, with the purpose to outline a valid definition of how to achieve competitive advantage in climate change risk management consulting.

  2. 12 CFR 563.176 - Interest-rate-risk-management procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false Interest-rate-risk-management procedures. 563... ASSOCIATIONS-OPERATIONS Financial Management Policies § 563.176 Interest-rate-risk-management procedures... association's management of that risk. (b) The board of directors shall formerly adopt a policy for the...

  3. 12 CFR 563.176 - Interest-rate-risk-management procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interest-rate-risk-management procedures. 563... ASSOCIATIONS-OPERATIONS Financial Management Policies § 563.176 Interest-rate-risk-management procedures... association's management of that risk. (b) The board of directors shall formerly adopt a policy for the...

  4. Meteorological risks are drivers of environmental innovation in agro-ecosystem management

    NASA Astrophysics Data System (ADS)

    Gobin, Anne; Van de Vyver, Hans; Vanwindekens, Frédéric; Planchon, Viviane; Verspecht, Ann; Frutos de Cachorro, Julia; Buysse, Jeroen

    2016-04-01

    Extreme weather events such as droughts, heat waves and rain storms are projected to increase both in frequency and magnitude with climate change. The research hypothesis of the MERINOVA project is that meteorological risks act as drivers of environmental innovation in agro-ecosystem management which is being tested using a chain of risk approach. The project comprises of five major parts that reflect the chain of risks: the hazard, its impact on different agro-ecosystems, vulnerability, risk management and risk communication. Generalized Extreme Value (GEV) theory was used to model annual maxima of meteorological variables based on a location-, scale- and shape-parameter that determine the center of the distribution, the deviation of the location-parameter and the upper tail decay, respectively. Spatial interpolation of GEV-derived return levels has yielded maps of temperature extremes, precipitation deficits and wet periods. The degree of temporal overlap between extreme weather conditions and sensitive periods in the agro-ecosystem was determined using a bio-physically based modelling framework that couples phenological models, a soil water balance, crop growth and environmental models. 20-year return values for frost, heat stress, drought, waterlogging and field access during different crop stages were related to arable yields. The spatial extent of vulnerability is developed on different layers of spatial information that include inter alia meteorology, soil-landscapes, crop cover and management. The level of vulnerability and resilience of an agro-ecosystem is also determined by risk management. The types of agricultural risk and their relative importance differ across sectors and farm types as elucidated by questionnaires and focus groups. Risk types are distinguished according to production, market, institutional, financial and liability risks. A portfolio of potential strategies was identified at farm, market and policy level. In conclusion, MERINOVA

  5. Web-Based versus High-Fidelity Simulation Training for Certified Registered Nurse Anesthetists in the Management of High Risk/Low Occurrence Anesthesia Events

    ERIC Educational Resources Information Center

    Kimemia, Judy

    2017-01-01

    Purpose: The purpose of this project was to compare web-based to high-fidelity simulation training in the management of high risk/low occurrence anesthesia related events, to enhance knowledge acquisition for Certified Registered Nurse Anesthetists (CRNAs). This project was designed to answer the question: Is web-based training as effective as…

  6. Risk management for the Space Exploration Initiative

    NASA Technical Reports Server (NTRS)

    Buchbinder, Ben

    1993-01-01

    Probabilistic Risk Assessment (PRA) is a quantitative engineering process that provides the analytic structure and decision-making framework for total programmatic risk management. Ideally, it is initiated in the conceptual design phase and used throughout the program life cycle. Although PRA was developed for assessment of safety, reliability, and availability risk, it has far greater application. Throughout the design phase, PRA can guide trade-off studies among system performance, safety, reliability, cost, and schedule. These studies are based on the assessment of the risk of meeting each parameter goal, with full consideration of the uncertainties. Quantitative trade-off studies are essential, but without full identification, propagation, and display of uncertainties, poor decisions may result. PRA also can focus attention on risk drivers in situations where risk is too high. For example, if safety risk is unacceptable, the PRA prioritizes the risk contributors to guide the use of resources for risk mitigation. PRA is used in the Space Exploration Initiative (SEI) Program. To meet the stringent requirements of the SEI mission, within strict budgetary constraints, the PRA structure supports informed and traceable decision-making. This paper briefly describes the SEI PRA process.

  7. Exploration Systems Development (ESD) Approach to Enterprise Risk Management

    NASA Technical Reports Server (NTRS)

    Bauder, Stephen P.

    2014-01-01

    The National Aeronautics and Space Administration (NASA) Exploration Systems Development (ESD) Division has implemented an innovative approach to Enterprise Risk Management under a unique governance structure and streamlined integration model. ESD's mission is to design and build the capability to extend human existence to deep space. The Enterprise consists of three Programs: Space Launch System (SLS), Orion, and Ground Systems Development and Operations (GSDO). The SLS is a rocket and launch system that will be capable of powering humans, habitats, and support systems to deep space. Orion will be the first spacecraft in history capable of taking humans to multiple destinations within deep space. GSDO is modernizing Kennedy's spaceport to launch spacecraft built and designed by both NASA and private industry. ESD's approach to Enterprise Risk Management is commensurate with affordability and a streamlined management philosophy. ESD Enterprise Risk Management leverages off of the primary mechanisms for integration within the Enterprise. The Enterprise integration approach emphasizes delegation of authority to manage and execute the majority of cross-program activities and products to the individual Programs, while maintaining the overall responsibility for all cross-program activities at the Division. The intent of the ESD Enterprise Risk Management approach is to improve risk communication, to avoid replication and/or contradictory strategies, and to minimize overhead process burden. This is accomplished by the facilitation and integration of risk information within ESD. The ESD Division risks, Orion risks, SLS risks, and GSDO risks are owned and managed by the applicable Program. When the Programs have shared risks with multiple consequences, they are jointly owned and managed. When a risk is associated with the integrated system that involves more than one Program in condition, consequence, or mitigation plan, it is considered an Exploration Systems Integration

  8. Violent reinjury risk assessment instrument (VRRAI) for hospital-based violence intervention programs.

    PubMed

    Kramer, Erik J; Dodington, James; Hunt, Ava; Henderson, Terrell; Nwabuo, Adaobi; Dicker, Rochelle; Juillard, Catherine

    2017-09-01

    Violent injury is the second most common cause of death among 15- to 24-year olds in the US. Up to 58% of violently injured youth return to the hospital with a second violent injury. Hospital-based violence intervention programs (HVIPs) have been shown to reduce injury recidivism through intensive case management. However, no validated guidelines for risk assessment strategies in the HVIP setting have been reported. We aimed to use qualitative methods to investigate the key components of risk assessments employed by HVIP case managers and to propose a risk assessment model based on this qualitative analysis. An established academic hospital-affiliated HVIP served as the nexus for this research. Thematic saturation was reached with 11 semi-structured interviews and two focus groups conducted with HVIP case managers and key informants identified through snowball sampling. Interactions were analyzed by a four-member team using Nvivo 10, employing the constant comparison method. Risk factors identified were used to create a set of models presented in two follow-up HVIP case managers and leadership focus groups. Eighteen key themes within seven domains (environment, identity, mental health, behavior, conflict, indicators of lower risk, and case management) and 141 potential risk factors for use in the risk assessment framework were identified. The most salient factors were incorporated into eight models that were presented to the HVIP case managers. A 29-item algorithmic structured professional judgment model was chosen. We identified four tiers of risk factors for violent reinjury that were incorporated into a proposed risk assessment instrument, VRRAI. Copyright © 2017 Elsevier Inc. All rights reserved.

  9. Assessment and management of fracture risk in patients with Parkinson's disease.

    PubMed

    Lyell, Veronica; Henderson, Emily; Devine, Mark; Gregson, Celia

    2015-01-01

    Parkinson's disease (PD) is associated with substantially increased fracture risk, particularly hip fracture, which can occur relatively early in the course of PD. Despite this, current national clinical guidelines for PD fail to adequately address fracture risk assessment or the management of bone health. We appraise the evidence supporting bone health management in PD and propose a PD-specific algorithm for the fracture risk assessment and the management of bone health in patients with PD and related movement disorders. The algorithm considers (i) calcium and vitamin D replacement and maintenance, (ii) quantification of prior falls and fractures, (iii) calculation of 10-year major osteoporotic and hip fracture risks using Qfracture, (iv) application of fracture risk thresholds, which if fracture risk is high (v) prompts anti-resorptive treatment, with or without dual X-ray absorptiometry, and if low (vi) prompts re-assessment with FRAX and application of National Osteoporosis Guidelines Group (NOGG) guidance. A range of anti-resorptive agents are now available to treat osteoporosis; we review their use from the specific perspective of a clinician managing a patient population with PD. In conclusion, our current evidence base supports updating of guidelines globally concerning the management of PD, which presently fail to adequately address bone health. © The Author 2014. Published by Oxford University Press on behalf of the British Geriatrics Society. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  10. Draugen HSE-case - occupational health risk management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glas, J.J.P.; Kjaer, E.

    1996-12-31

    The Draugen HSE-Case serves as a risk management tool. Originally, risk management included only major safety hazards to personnel, environment and assets. Work Environment risks such as ergonomics, psycho-social factors and exposure to chemicals and noise, was not given the same attention. The Draugen HSE-Case addresses this weakness and extends all work environment risks. In order to promote line responsibility and commitment, relevant personnel is involved in the Case development. {open_quotes}THESIS{degrees}, a software application, is used to systematize input and to generate reports. The Draugen HSE-case encompasses: HSE risk analyses related to specific activities; Control of risk related to workmore » environment; Established tolerability criteria; Risk reducing measures; Emergency contingency measures; and Requirements for Competence and Follow-up. The development of Draugen HSE-Case is a continuous process. It will serve to minimize the potential of occupational illnesses, raise general awareness, and make occupational health management more cost-effective.« less

  11. Customer-Specific Transaction Risk Management in E-Commerce

    NASA Astrophysics Data System (ADS)

    Ruch, Markus; Sackmann, Stefan

    Increasing potential for turnover in e-commerce is inextricably linked with an increase in risk. Online retailers (e-tailers), aiming for a company-wide value orientation should manage this risk. However, current approaches to risk management either use average retail prices elevated by an overall risk premium or restrict the payment methods offered to customers. Thus, they neglect customer-specific value and risk attributes and leave turnover potentials unconsidered. To close this gap, an innovative valuation model is proposed in this contribution that integrates customer-specific risk and potential turnover. The approach presented evaluates different payment methods using their risk-turnover characteristic, provides a risk-adjusted decision basis for selecting payment methods and allows e-tailers to derive automated risk management decisions per customer and transaction without reducing turnover potential.

  12. Back to basics--just how much should a risk manager know about risk financing?

    PubMed

    Miller, Vivian B

    2011-01-01

    Whether directly involved in development and implementation of the organization's risk financing program or not, risk management professionals, at the very least, need to be familiar with and understand the various risk financing strategies available to address all areas of exposure. This article addresses the types of coverages and risk financing options that should be considered when developing a comprehensive risk-financing program, and why it is important for risk management professionals to have some knowledge about these products, in order for their true value to be fully appreciated. © 2011 American Society for Healthcare Risk Management of the American Hospital Association.

  13. The effectiveness of risk management program on pediatric nurses' medication error.

    PubMed

    Dehghan-Nayeri, Nahid; Bayat, Fariba; Salehi, Tahmineh; Faghihzadeh, Soghrat

    2013-09-01

    Medication therapy is one of the most complex and high-risk clinical processes that nurses deal with. Medication error is the most common type of error that brings about damage and death to patients, especially pediatric ones. However, these errors are preventable. Identifying and preventing undesirable events leading to medication errors are the main risk management activities. The aim of this study was to investigate the effectiveness of a risk management program on the pediatric nurses' medication error rate. This study is a quasi-experimental one with a comparison group. In this study, 200 nurses were recruited from two main pediatric hospitals in Tehran. In the experimental hospital, we applied the risk management program for a period of 6 months. Nurses of the control hospital did the hospital routine schedule. A pre- and post-test was performed to measure the frequency of the medication error events. SPSS software, t-test, and regression analysis were used for data analysis. After the intervention, the medication error rate of nurses at the experimental hospital was significantly lower (P < 0.001) and the error-reporting rate was higher (P < 0.007) compared to before the intervention and also in comparison to the nurses of the control hospital. Based on the results of this study and taking into account the high-risk nature of the medical environment, applying the quality-control programs such as risk management can effectively prevent the occurrence of the hospital undesirable events. Nursing mangers can reduce the medication error rate by applying risk management programs. However, this program cannot succeed without nurses' cooperation.

  14. Managing the financial risk of low water levels in Great Lakes with index-based contracts

    NASA Astrophysics Data System (ADS)

    Meyer, E.; Characklis, G. W.; Brown, C. M.; Moody, P.

    2014-12-01

    Low water levels in the Great Lakes have recently had significant financial impacts on the region's commercial shipping, responsible for transporting millions of dollars' worth of bulk goods each year. Low lake levels can significantly affect shipping firms, as cargo capacity is a function of draft, or the distance between water level and the ship's bottom. Draft increases with weight, and lower lake levels force ships to reduce cargo to prevent running aground in shallow harbors, directly impacting the finances of shipping companies. Risk transfer instruments may provide adaptable, yet unexplored, alternatives for managing these financial risks, at significantly less expense than more traditional solutions (e.g., dredging). Index-based financial instruments can be particularly attractive as contract payouts are directly linked to well-defined transparent metrics (e.g., lake levels), eliminating the need for subjective adjustors, as well as concerns over moral hazard. In developing such instruments, a major challenge is identifying an index that is well correlated with financial losses, and thus a contract that reliably pays out when losses are experienced (low basis risk). In this work, a relationship between lake levels and shipping revenues is developed, and actuarial analyses of the frequency and magnitude of revenue losses is completed using this relationship and synthetic water level data. This analysis is used to develop several types of index-based contracts. A standardized suite of binary contracts is developed, with each indexed to lake levels and priced according to predefined thresholds. These are combined to form portfolios with different objectives (e.g. options, collars), with optimal portfolio structure and length of coverage determined by limiting basis risk and contract cost, using simulations over the historic dataset. Results suggest that portfolios of these binary contracts can substantially reduce the risk of financial losses during periods of

  15. Economic assessment of home-based COPD management programs.

    PubMed

    Liu, Sheena Xin; Lee, Michael C; Atakhorrami, Maryam; Tatousek, Jan; McCormack, Meredith; Yung, Rex; Hart, Nicholas; White, David P

    2013-12-01

    Home-based exacerbation management programs have been proposed as an approach to reducing the clinical and financial burden of COPD. We demonstrate a framework to evaluate such programs in order to guide program design and performance decisions towards optimizing cost and clinical outcomes. This study models the impact of hypothetical exacerbation management programs through probabilistic Markov simulations. Patients were stratified by risk using exacerbation rates from the ECLIPSE study and expert opinion. Three scenarios were modeled, using base, worst and best case parameters to suggest potential telehealth program performance. In these scenarios, acute exacerbations could be detected early, with sensitivity and specificity ranging from 60-90%. Detected acute exacerbations could be diverted to either a sub-acute pathway (12.5-50% probability), thus entirely avoiding hospitalization, or a lower cost pathway through length-of-stay reduction (14-28% reduction). For a cohort of patients without prior hospitalization, the base case telehealth scenario results in a cumulative per-patient lifetime savings of $2.9 K over ≈ 12 years. For a higher risk cohort of patients with a prior admission and 1 to 2 acute exacerbations per year, a cumulative $16K per patient was saved during the remaining ≈ 3 life-years. Acceptable prices for home-based exacerbation detection testing were highly dependent on patient risk and scenario, but ranged from $290-$1263 per month for the highest risk groups. These results suggest the economic viability of exacerbation management programs and highlight the importance of risk stratification in such programs. The presented model can further be adapted to model specific programs as trial data becomes available.

  16. Targeting hunter distribution based on host resource selection and kill sites to manage disease risk.

    PubMed

    Dugal, Cherie J; van Beest, Floris M; Vander Wal, Eric; Brook, Ryan K

    2013-10-01

    Endemic and emerging diseases are rarely uniform in their spatial distribution or prevalence among cohorts of wildlife. Spatial models that quantify risk-driven differences in resource selection and hunter mortality of animals at fine spatial scales can assist disease management by identifying high-risk areas and individuals. We used resource selection functions (RSFs) and selection ratios (SRs) to quantify sex- and age-specific resource selection patterns of collared (n = 67) and hunter-killed (n = 796) nonmigratory elk (Cervus canadensis manitobensis) during the hunting season between 2002 and 2012, in southwestern Manitoba, Canada. Distance to protected area was the most important covariate influencing resource selection and hunter-kill sites of elk (AICw = 1.00). Collared adult males (which are most likely to be infected with bovine tuberculosis (Mycobacterium bovis) and chronic wasting disease) rarely selected for sites outside of parks during the hunting season in contrast to adult females and juvenile males. The RSFs showed selection by adult females and juvenile males to be negatively associated with landscape-level forest cover, high road density, and water cover, whereas hunter-kill sites of these cohorts were positively associated with landscape-level forest cover and increasing distance to streams and negatively associated with high road density. Local-level forest was positively associated with collared animal locations and hunter-kill sites; however, selection was stronger for collared juvenile males and hunter-killed adult females. In instances where disease infects a metapopulation and eradication is infeasible, a principle goal of management is to limit the spread of disease among infected animals. We map high-risk areas that are regularly used by potentially infectious hosts but currently underrepresented in the distribution of kill sites. We present a novel application of widely available data to target hunter distribution based on host resource

  17. International comparative analyses of healthcare risk management.

    PubMed

    Sun, Niuyun; Wang, Li; Zhou, Jun; Yuan, Qiang; Zhang, Zongjiu; Li, Youping; Liang, Minghui; Cheng, Lan; Gao, Guangming; Cui, Xiaohui

    2011-02-01

    Interpretation of the growing body of global literature on health care risk is compromised by a lack of common understanding and language. This series of articles aims to comprehensively compare laws and regulations, institutional management, and administration of incidence reporting systems on medical risk management in the United Kingdom, the United States, Canada, Australia, and Taiwan, so as to provide evidence and recommendations for health care risk management policy in China. We searched the official websites of the healthcare risk management agencies of the four countries and one district for laws, regulatory documents, research reports, reviews and evaluation forms concerned with healthcare risk management and assessment. Descriptive comparative analysis was performed on relevant documents. A total of 146 documents were included in this study, including 2 laws (1.4%), 17 policy documents (11.6%), 41 guidance documents (28.1%), 37 reviews (25.3%), and 49 documents giving general information (33.6%). The United States government implemented one law and one rule of patient safety management, while the United Kingdom and Australia each issued professional guidances on patient safety improvement. The four countries implemented patient safety management policy on four different levels: national, state/province, hospital, and non-governmental organization. The four countries and one district adopted four levels of patient safety management, and the administration modes can be divided into an "NGO-led mode" represented by the United States and Canada and a "government-led mode" represented by the United Kingdom, Australia, and Taiwan. © 2011 Blackwell Publishing Asia Pty Ltd and Chinese Cochrane Center, West China Hospital of Sichuan University.

  18. Modeling insurer-homeowner interactions in managing natural disaster risk.

    PubMed

    Kesete, Yohannes; Peng, Jiazhen; Gao, Yang; Shan, Xiaojun; Davidson, Rachel A; Nozick, Linda K; Kruse, Jamie

    2014-06-01

    The current system for managing natural disaster risk in the United States is problematic for both homeowners and insurers. Homeowners are often uninsured or underinsured against natural disaster losses, and typically do not invest in retrofits that can reduce losses. Insurers often do not want to insure against these losses, which are some of their biggest exposures and can cause an undesirably high chance of insolvency. There is a need to design an improved system that acknowledges the different perspectives of the stakeholders. In this article, we introduce a new modeling framework to help understand and manage the insurer's role in catastrophe risk management. The framework includes a new game-theoretic optimization model of insurer decisions that interacts with a utility-based homeowner decision model and is integrated with a regional catastrophe loss estimation model. Reinsurer and government roles are represented as bounds on the insurer-insured interactions. We demonstrate the model for a full-scale case study for hurricane risk to residential buildings in eastern North Carolina; present the results from the perspectives of all stakeholders-primary insurers, homeowners (insured and uninsured), and reinsurers; and examine the effect of key parameters on the results. © 2014 Society for Risk Analysis.

  19. Case-based Influence in Conflict Management

    DTIC Science & Technology

    2014-10-31

    AFRL-OSR-VA-TR-2014-0337 CASE-BASED INFLUENCE IN CONFLICT MANAGEMENT Robert Axelrod ARTIS RESEARCH & RISK MODELING Final Report 10/31/2014...FA9550-10-1-0373 Dr. Robert Axelrod - PI Dr. Richard Davis- PD ARTIS Research & Risk Modeling ARTIS 5741 Canyon Ridge North Cave Creek, AZ 85331-9318...analysis of the timing of cyber conflict that quickly received attention from over 30 countries. 3 1 Axelrod , Final Report and Publications Final

  20. Effectiveness of a Reduced-Risk Insecticide Based Bed Bug Management Program in Low-Income Housing.

    PubMed

    Singh, Narinderpal; Wang, Changlu; Cooper, Richard

    2013-11-28

    Bed bug (Cimex lectularius L.) infestations are becoming increasingly common in low-income communities. Once they are introduced, elimination is very difficult. As part of the efforts to develop effective and safe bed bug management programs, we conducted a laboratory study evaluating the efficacy of a reduced-risk insecticide-Alpine aerosol (0.5% dinotefuran). We then conducted a field evaluation of a reduced-risk insecticide based integrated pest management (IPM) program in low-income family apartments with young children. In laboratory evaluations, direct spray and 5 min exposure to dry Alpine aerosol residue caused 100.0 ± 0.0 and 91.7 ± 8.3% mortality to bed bug nymphs, respectively. Direct Alpine aerosol spray killed 91.3 ± 4.3% of the eggs. The IPM program included education, steam, bagging infested linens, placing intercepting devices under furniture legs and corners of rooms, applying Alpine aerosol and Alpine dust (0.25% dinotefuran, 95% diatomaceous earth dust), and regularly scheduled monitoring and re-treatment. Nine apartments ranging from 1-1,428 (median: 29) bed bugs based on visual inspection and Climbup interceptor counts were included. Over a 6-month period, an average 172 g insecticide (Alpine aerosol + Alpine dust) was used in each apartment, a 96% reduction in pesticide usage compared to chemical only treatment reported in a similar environment. The IPM program resulted in an average of 96.8 ± 2.2% reduction in the number of bed bugs. However, elimination of bed bugs was only achieved in three lightly infested apartments (<30 bed bugs at the beginning). Elimination success was closely correlated with the level of bed bug populations.

  1. Effectiveness of a Reduced-Risk Insecticide Based Bed Bug Management Program in Low-Income Housing

    PubMed Central

    Singh, Narinderpal; Wang, Changlu; Cooper, Richard

    2013-01-01

    Bed bug (Cimex lectularius L.) infestations are becoming increasingly common in low-income communities. Once they are introduced, elimination is very difficult. As part of the efforts to develop effective and safe bed bug management programs, we conducted a laboratory study evaluating the efficacy of a reduced-risk insecticide—Alpine aerosol (0.5% dinotefuran). We then conducted a field evaluation of a reduced-risk insecticide based integrated pest management (IPM) program in low-income family apartments with young children. In laboratory evaluations, direct spray and 5 min exposure to dry Alpine aerosol residue caused 100.0 ± 0.0 and 91.7 ± 8.3% mortality to bed bug nymphs, respectively. Direct Alpine aerosol spray killed 91.3 ± 4.3% of the eggs. The IPM program included education, steam, bagging infested linens, placing intercepting devices under furniture legs and corners of rooms, applying Alpine aerosol and Alpine dust (0.25% dinotefuran, 95% diatomaceous earth dust), and regularly scheduled monitoring and re-treatment. Nine apartments ranging from 1–1,428 (median: 29) bed bugs based on visual inspection and Climbup interceptor counts were included. Over a 6-month period, an average 172 g insecticide (Alpine aerosol + Alpine dust) was used in each apartment, a 96% reduction in pesticide usage compared to chemical only treatment reported in a similar environment. The IPM program resulted in an average of 96.8 ± 2.2% reduction in the number of bed bugs. However, elimination of bed bugs was only achieved in three lightly infested apartments (<30 bed bugs at the beginning). Elimination success was closely correlated with the level of bed bug populations. PMID:26462533

  2. Quantifying risk and accuracy in cancer risk assessment: the process and its role in risk management problem-solving.

    PubMed

    Turturro, A; Hart, R W

    1987-01-01

    A better understanding of chemical-induced cancer has led to appreciation of similarities to problems addressed by risk management of radiation-induced toxicity. Techniques developed for cancer risk assessment of toxic substances can be generalized to toxic agents. A recent problem-solving approach for risk management of toxic substances developed for the U.S. Department of Health and Human Services, and the role of risk assessment and how uncertainty should be treated within the context of this approach, is discussed. Finally, two different methods, research into the assumptions underlying risk assessment and the modification of risk assessment/risk management documents, are used to illustrate how the technique can be applied.

  3. [Paradigm shift in health: forecasting and causation as a basis for risk management].

    PubMed

    Denisov, E I; Prokopenko, L V; Golovaneva, G V; Stepanian, I V

    2012-01-01

    The problem of occupational risk management (ORM) is discussed using the evidence-based medicine approach and bio- and IT-technologies. The prognosis and causation of work-related health disorders are analyzed as components of ORM system. The Web-based handbook "Occupational risk assessment" with software and information materials as practical tool is presented.

  4. Obstetrics Hospitalists: Risk Management Implications.

    PubMed

    Veltman, Larry

    2015-09-01

    The concept of having an in-house obstetrician (serving as an obstetrics [OB] hospitalist) available 24 hours a day, 7 days a week provides a safety net for OB events that many need immediate intervention for a successful outcome. A key precept of risk management, that of loss prevention, fits perfectly with the addition of an OB hospitalist role in the perinatal department. Inherent in the role of OB hospitalists are the patient safety and risk management principles of improved communication, enhanced readiness, and immediate availability. Copyright © 2015 Elsevier Inc. All rights reserved.

  5. Characterizing Drought Risk Management and Assessing the Robustness of Snowpack-based Drought Indicators in the Upper Colorado River Basin.

    NASA Astrophysics Data System (ADS)

    Livneh, B.; Badger, A.; Lukas, J.; Dilling, L.; Page, R.

    2017-12-01

    Drought conditions over the past two decades have arisen during a time of increasing water demands in the Upper Colorado River Basin. The Basin's highly allocated and diverse water systems raise the question of how drought-based information, such as snowpack, streamflow, and reservoir conditions, can be used to inform drought risk management. Like most of the western U.S., snow-water equivalent (SWE) at key dates during the year (e.g., April 1) is routinely used in water resource planning because it is often the highest observed value during the season and it embodies stored water to be released, through melt, during critical periods later in the summer. This presentation will first focus on how water managers on Colorado's Western Slope (a) perceive drought-related risk, (b) use and access drought information, and (c) respond to drought. Preliminary findings will be presented from in-person interviews, document analysis, observations of planning meetings, and other interactions with seven water-management entities across the Western Slope. The second part of the presentation will focus on how the predictive power of snowpack-based drought indicators—identified as the most useful and reliable drought indicator by regional water stakeholders—are expected change in a warmer world, i.e. where expectations are for more rain versus snow, smaller snowpacks, and earlier snowmelt and peak runoff. We will present results from hydrologic simulations using climate projection to examine how a warming climate will affect the robustness of these snowpack-based drought indicators by mid-century.

  6. Risk stratification and management of acute pulmonary embolism.

    PubMed

    Becattini, Cecilia; Agnelli, Giancarlo

    2016-12-02

    The clinical management of patients with acute pulmonary embolism is rapidly changing over the years. The widening spectrum of clinical management strategies for these patients requires effective tools for risk stratification. Patients at low risk for death could be candidates for home treatment or early discharge. Clinical models with high negative predictive value have been validated that could be used to select patients at low risk for death. In a major study and in several meta-analyses, thrombolysis in hemodynamically stable patients was associated with unacceptably high risk for major bleeding complications or intracranial hemorrhage. Thus, the presence of shock or sustained hypotension continues to be the criterion for the selection of candidates for thrombolytic treatment. Interventional procedures for early revascularization should be reserved to selected patients until further evidence is available. No clinical advantage is expected with the insertion of a vena cava filter in the acute-phase management of patients with acute pulmonary embolism. Direct oral anticoagulants used in fixed doses without laboratory monitoring showed similar efficacy (odds ratio [OR], 0.89; 95% confidence interval [CI], 0.70-1.12) and safety (OR, 0.89; 95% CI, 0.77-1.03) in comparison with conventional anticoagulation in patients with acute pulmonary embolism. Based on these results and on their practicality, direct oral anticoagulants are the agents of choice for the treatment of the majority of patients with acute pulmonary embolism. © 2016 by The American Society of Hematology. All rights reserved.

  7. Managing Chemical & Material Risks

    DTIC Science & Technology

    2011-12-01

    Certification Program Acquisition, Technology and Logistics 9 DoD Hexavalent Chromium Risk Reduction Non- Chrome Primer II EXAVAJ ENT CHROM lrUMI...Royal Demolition eXplosive (RDX) • Cyclotrimethylenetrinitramine  Hexavalent Chromium (Cr6+) Naphthalene …pending downgrade to watch list Beryllium...T1me (secondo) 700 Acquisition, Technology and Logistics 10 Hexavalent Chromium Risk Management Actions • DoD minimization policy signed April

  8. The role of risk perception in making flood risk management more effective

    NASA Astrophysics Data System (ADS)

    Buchecker, M.; Salvini, G.; Di Baldassarre, G.; Semenzin, E.; Maidl, E.; Marcomini, A.

    2013-11-01

    Over the last few decades, Europe has suffered from a number of severe flood events and, as a result, there has been a growing interest in probing alternative approaches to managing flood risk via prevention measures. A literature review reveals that, although in the last decades risk evaluation has been recognized as key element of risk management, and risk assessment methodologies (including risk analysis and evaluation) have been improved by including social, economic, cultural, historical and political conditions, the theoretical schemes are not yet applied in practice. One main reason for this shortcoming is that risk perception literature is mainly of universal and theoretical nature and cannot provide the necessary details to implement a comprehensive risk evaluation. This paper therefore aims to explore a procedure that allows the inclusion of stakeholders' perceptions of prevention measures in risk assessment. It proposes to adopt methods of risk communication (both one-way and two-way communication) in risk assessment with the final aim of making flood risk management more effective. The proposed procedure not only focuses on the effect of discursive risk communication on risk perception, and on achieving a shared assessment of the prevention alternatives, but also considers the effects of the communication process on perceived uncertainties, accepted risk levels, and trust in the managing institutions. The effectiveness of this combined procedure has been studied and illustrated using the example of the participatory flood prevention assessment process on the Sihl River in Zurich, Switzerland. The main findings of the case study suggest that the proposed procedure performed well, but that it needs some adaptations for it to be applicable in different contexts and to allow a (semi-) quantitative estimation of risk perception to be used as an indicator of adaptive capacity.

  9. Evaluation of volcanic risk management in Merapi and Bromo Volcanoes

    NASA Astrophysics Data System (ADS)

    Bachri, S.; Stöetter, J.; Sartohadi, J.; Setiawan, M. A.

    2012-04-01

    Merapi (Central Java Province) and Bromo (East Java Province) volcanoes have human-environmental systems with unique characteristics, thus causing specific consequences on their risk management. Various efforts have been carried out by many parties (institutional government, scientists, and non-governmental organizations) to reduce the risk in these areas. However, it is likely that most of the actions have been done for temporary and partial purposes, leading to overlapping work and finally to a non-integrated scheme of volcanic risk management. This study, therefore, aims to identify and evaluate actions of risk and disaster reduction in Merapi and Bromo Volcanoes. To achieve this aims, a thorough literature review was carried out to identify earlier studies in both areas. Afterward, the basic concept of risk management cycle, consisting of risk assessment, risk reduction, event management and regeneration, is used to map those earlier studies and already implemented risk management actions in Merapi and Bromo. The results show that risk studies in Merapi have been developed predominantly on physical aspects of volcanic eruptions, i.e. models of lahar flows, hazard maps as well as other geophysical modeling. Furthermore, after the 2006 eruption of Merapi, research such on risk communication, social vulnerability, cultural vulnerability have appeared on the social side of risk management research. Apart from that, disaster risk management activities in the Bromo area were emphasizing on physical process and historical religious aspects. This overview of both study areas provides information on how risk studies have been used for managing the volcano disaster. This result confirms that most of earlier studies emphasize on the risk assessment and only few of them consider the risk reduction phase. Further investigation in this field work in the near future will accomplish the findings and contribute to formulate integrated volcanic risk management cycles for both

  10. Air quality risk management.

    PubMed

    Williams, Martin L

    2008-01-01

    Rather than attempt to provide a comprehensive account of air quality risk assessment, as might be found in a textbook or manual, this article discusses some issues that are of current importance in the United Kingdom and the rest of Europe, with special emphasis on risk assessment in the context of policy formulation, and emerging scientific knowledge. There are two pollutants of particular concern and that both pose challenges for risk assessment and policy, and they are particulate matter (PM) and ozone. The article describes some issues for health risk assessment and finally some forward-looking suggestions for future approaches to air quality management.

  11. Risk management of PPP project in the preparation stage based on Fault Tree Analysis

    NASA Astrophysics Data System (ADS)

    Xing, Yuanzhi; Guan, Qiuling

    2017-03-01

    The risk management of PPP(Public Private Partnership) project can improve the level of risk control between government departments and private investors, so as to make more beneficial decisions, reduce investment losses and achieve mutual benefit as well. Therefore, this paper takes the PPP project preparation stage venture as the research object to identify and confirm four types of risks. At the same time, fault tree analysis(FTA) is used to evaluate the risk factors that belong to different parts, and quantify the influencing degree of risk impact on the basis of risk identification. In addition, it determines the importance order of risk factors by calculating unit structure importance on PPP project preparation stage. The result shows that accuracy of government decision-making, rationality of private investors funds allocation and instability of market returns are the main factors to generate the shared risk on the project.

  12. Selected Aspects Of The Risk In The Supply Chain In Context Of The Supplier Quality Management

    NASA Astrophysics Data System (ADS)

    Koblen, Ivan; Lestyánszka Škůrková, Katarína

    2015-06-01

    The introductory part of the paper underlines the importance of "Risk-based thinking" in the Quality Management System (QMS) and risk in the supply chain, as a principle part of the QMS. After introducing the key terms, the authors focused on the principle part of the article - explanation of the external and internal supply chain risks and the main factors concerning the supply risks, demand risks and environmental risks (as cardinal types of external supply chain risks) as well as the manufacturing and process risks, network/planning and control risks (as most important types of internal supply chain risks). The authors inform on the selected supply chain risk management tools, especially on those which are linked to the appropriate utilization of quality management tools.

  13. 7 CFR 2.44 - Administrator, Risk Management Agency and Manager, Federal Crop Insurance Corporation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... for the transaction of the business of the Federal Crop Insurance Corporation and the Risk Management... 7 Agriculture 1 2010-01-01 2010-01-01 false Administrator, Risk Management Agency and Manager... Management Agency and Manager, Federal Crop Insurance Corporation. (a) Delegations. Pursuant to § 2.16(a)(4...

  14. Risk and Reliability of Infrastructure Asset Management Workshop

    DTIC Science & Technology

    2006-08-01

    of assets within the portfolio for use in Risk and Reliability analysis ... US Army Corps of Engineers assesses its Civil Works infrastructure and applies risk and reliability in the management of that infrastructure. The ... the Corps must complete assessments across its portfolio of major assets before risk management can be used in decision making. Effective risk

  15. Measuring Property Management Risk and Loss: Step One Toward Managing Property on a Foundation of Risk, Cost, and Benefit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Curtis

    1999-05-17

    This is a period of ever-tightening defense budgets and continuing pressure on the public sector to be more commercial-like, Property policies, practices, and regulations are increasingly being challenged and changed. In these times, we must be leaders in understanding and defining the value of our profession from a commercial standpoint so that we can provide the right services to our customers and explain and defend the value of those services. To do so, we must step outside current property management practices, regulations, and oversight. We must learn to think and speak in the language of those who fund us--a financialmore » language of risk, cost, and benefit. Regardless of regulation and oversight, our bosses are demanding that we demonstrate (financially) the benefits of current practice, or else. This article is intended to be the beginning of an effort to understand and define our profession in terms of risk, cost, and benefit so that we can meet these new challenges. The first step in this effort must be defining and measuring risk, cost, and benefit. Our costs, although sometimes difficult to capture, are easy to understand: they are almost exclusively the effort, both within and without the property management organization, involved in managing property. Unfortunately, property risks and benefits are not so simple or so well understood. Generally, risks and benefits are identified and measured through physical inventory results: potential and actual shortages. This paper will explore the weaknesses in the current understanding and use of shortage information as the yardstick for property management risks and performance. It will define a new framework for understanding the purpose and value of property management. And finally, it will set a course for a new method of measuring and valuing physical inventoty shortages. This new method will yield accurate and useful measures of property management risk and benefit. Once risk and benefit are accurately

  16. Clinical risk management in obstetrics.

    PubMed

    Holden, Deborah A; Quin, Maureen; Holden, Des P

    2004-04-01

    Over recent years there has been a growing appreciation that a small but significant proportion of patients experience (sometimes serious) adverse events in the hands of health care workers. Although research in this area is very much in its infancy there has been an increasing move towards applying principles of risk management from industry to health care organizations. With the particularly disastrous and costly nature of adverse outcomes in obstetrics it is appropriate to review clinical risk management issues in maternity. This review explores the appropriateness of applying lessons learned in industry to maternity. The classification of errors into individual and latent, or organizational, is examined. Furthermore, the way in which these errors can be identified and subsequently analysed, with examples from maternity units in the UK and USA, is discussed. The importance of an educational and supportive environment, rather than a blame culture, for both reporting of incidents and learning from adverse outcomes is emphasized. Improvement in patient experience of health care rests not just with improved treatments, but also with a reduction in the adverse events which occur in health care institutions. The principles by which risk can be identified prospectively and retrospectively, and the mechanisms for both local risk management and regional/national reporting and learning are considered.

  17. Supply chain risk management in newspaper company: House of risk approach

    NASA Astrophysics Data System (ADS)

    Ratnasari, Sintya; Hisjam, Muhammad; Sutopo, Wahyudi

    2018-02-01

    In the supply chain (SC) of newspapers, the printing company is the main entity that has several processes, i.e. procure raw materials, print plate and newspapers, and also distribute newspaper to consumers. The existing risks in the newspaper printing company are quite high. A wide range of disturbances or risks needs to be identified to map out the characteristics of the risk sources that will impact on the performance of the supply chain. Therefore, the printing companies need to manage their supply chain risk of the five major SC processes (such as plan, source, deliver, make, and return). In a case study of a newspaper company in Surakarta, the company have not implemented a risk management process that affects the company. This study is aimed to map the risks in the printing company and formulate risk mitigation alternatives to mitigate the risks. The house of risk (HOR) method was chosen to select a set of proactive actions deemed cost-effective in managing SC Risks in the newspaper company. The model consisting of two stages, the first stage (HOR1) was done by identifying risk, risk causing agents and then measured the severity and occurrences to calculate the Aggregate Risk Priority (ARP) value. The second stage (HOR2) is intended to formulate and prioritize the action of mitigation that the company should pursue to reduce the probability of risk agents to occur. The result shows that the innovative model of HOR in Newspaper Company was presented. There are 24 risk events, 20 causing agents and two priority risks in HOR1. The HOR 2 was proposed 9 ranks of mitigation strategy for priority risk agents, from the easiest to the hardest strategy for the company to implement it.

  18. Flood Risk Management Policy in Scotland: Research Questions Past, Present and Future

    NASA Astrophysics Data System (ADS)

    Wilkinson, Mark; Hastings, Emily; MacDonald, Jannette

    2016-04-01

    Scotland's Centre of Expertise for Waters (CREW) delivers accessible research and expert opinion to support the Scottish Government and its delivery partners in the development and implementation of water policy. It was established in 2011 by the Scottish Government (Rural and Environmental Science and Analytical Services) in recognition of a gap in the provision of short term advice and research to policy (development and implementation). Key policy areas include the Water Framework Directive, Floods Directive, Drinking Water Directive, Habitats Directive and Scotland's Hydro Nation Strategy. CREW is unique in its demand-driven and free service for policy makers and practitioners, managing the engagement between scientists, policy makers and practitioners to work effectively across this interface. The users of CREW are the Scottish Government, Scottish Environment Protection Agency, Scottish Natural Heritage and Scottish Water. CREW has funded around 100 projects relating to water policy since its inception in 2011. Of these, a significant number relate to flood risk management policy. Based on a review of work to date, this poster will give an overview of these projects and a forward look at the challenges that remain. From learning from community led flood risk management to surface water flood forecasting for urban communities, links will be made between sustainable and traditional flood risk management while considering the perceptions of stakeholders to flood risk management. How can we deliver fully integrated flood risk management options? How policy makers, scientists and land managers can better work together will also be explored.

  19. Risk Management Certainty Act

    THOMAS, 113th Congress

    Rep. Hudson, Richard [R-NC-8

    2014-01-07

    House - 02/12/2014 Referred to the Subcommittee on General Farm Commodities and Risk Management. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  20. Implementation of Risk Management in NASA's CEV Project- Ensuring Mission Success

    NASA Astrophysics Data System (ADS)

    Perera, Jeevan; Holsomback, Jerry D.

    2005-12-01

    Most project managers know that Risk Management (RM) is essential to good project management. At NASA, standards and procedures to manage risk through a tiered approach have been developed - from the global agency-wide requirements down to a program or project's implementation. The basic methodology for NASA's risk management strategy includes processes to identify, analyze, plan, track, control, communicate and document risks. The identification, characterization, mitigation plan, and mitigation responsibilities associated with specific risks are documented to help communicate, manage, and effectuate appropriate closure. This approach helps to ensure more consistent documentation and assessment and provides a means of archiving lessons learned for future identification or mitigation activities.A new risk database and management tool was developed by NASA in 2002 and since has been used successfully to communicate, document and manage a number of diverse risks for the International Space Station, Space Shuttle, and several other NASA projects and programs including at the Johnson Space Center. Organizations use this database application to effectively manage and track each risk and gain insight into impacts from other organization's viewpoint to develop integrated solutions. Schedule, cost, technical and safety issues are tracked in detail through this system.Risks are tagged within the system to ensure proper review, coordination and management at the necessary management level. The database is intended as a day-to- day tool for organizations to manage their risks and elevate those issues that need coordination from above. Each risk is assigned to a managing organization and a specific risk owner who generates mitigation plans as appropriate. In essence, the risk owner is responsible for shepherding the risk through closure. The individual that identifies a new risk does not necessarily get assigned as the risk owner. Whoever is in the best position to effectuate

  1. Risk Management Considerations for Interoperable Acquisition

    DTIC Science & Technology

    2006-08-01

    Electronics Engineers (IEEE) to harmonize the standards for software (IEEE 12207 ) and system (IEEE 15288) life-cycle processes. A goal of this harmonization...management ( ISO /IEC 16085) is being generalized to apply to the systems level. The revised, generalized standard will add require- ments and guidance for the...risk management. The documents include the following: • ISO /IEC Guide 73: Risk Management—Vocabulary—Guidelines for use in stan- dards [ ISO 02

  2. Integrating legal liabilities in nanomanufacturing risk management.

    PubMed

    Mohan, Mayank; Trump, Benjamin D; Bates, Matthew E; Monica, John C; Linkov, Igor

    2012-08-07

    Among other things, the wide-scale development and use of nanomaterials is expected to produce costly regulatory and civil liabilities for nanomanufacturers due to lingering uncertainties, unanticipated effects, and potential toxicity. The life-cycle environmental, health, and safety (EHS) risks of nanomaterials are currently being studied, but the corresponding legal risks have not been systematically addressed. With the aid of a systematic approach that holistically evaluates and accounts for uncertainties about the inherent properties of nanomaterials, it is possible to provide an order of magnitude estimate of liability risks from regulatory and litigious sources based on current knowledge. In this work, we present a conceptual framework for integrating estimated legal liabilities with EHS risks across nanomaterial life-cycle stages using empirical knowledge in the field, scientific and legal judgment, probabilistic risk assessment, and multicriteria decision analysis. Such estimates will provide investors and operators with a basis to compare different technologies and practices and will also inform regulatory and legislative bodies in determining standards that balance risks with technical advancement. We illustrate the framework through the hypothetical case of a manufacturer of nanoscale titanium dioxide and use the resulting expected legal costs to evaluate alternative risk-management actions.

  3. Guidelines for Risk-Based Changeover of Biopharma Multi-Product Facilities.

    PubMed

    Lynch, Rob; Barabani, David; Bellorado, Kathy; Canisius, Peter; Heathcote, Doug; Johnson, Alan; Wyman, Ned; Parry, Derek Willison

    2018-01-01

    In multi-product biopharma facilities, the protection from product contamination due to the manufacture of multiple products simultaneously is paramount to assure product quality. To that end, the use of traditional changeover methods (elastomer change-out, full sampling, etc.) have been widely used within the industry and have been accepted by regulatory agencies. However, with the endorsement of Quality Risk Management (1), the use of risk-based approaches may be applied to assess and continuously improve established changeover processes. All processes, including changeover, can be improved with investment (money/resources), parallel activities, equipment design improvements, and standardization. However, processes can also be improved by eliminating waste. For product changeover, waste is any activity not needed for the new process or that does not provide added assurance of the quality of the subsequent product. The application of a risk-based approach to changeover aligns with the principles of Quality Risk Management. Through the use of risk assessments, the appropriate changeover controls can be identified and controlled to assure product quality is maintained. Likewise, the use of risk assessments and risk-based approaches may be used to improve operational efficiency, reduce waste, and permit concurrent manufacturing of products. © PDA, Inc. 2018.

  4. Risk management of LPG transport activities in Hong Kong.

    PubMed

    Boult, M

    2000-01-07

    This paper gives a background to risk management of liquefied petroleum gas (LPG) transport activities, with special regard to the activities taking place in Hong Kong. In particular, it looks at the recent activities undertaken by the Government of the Hong Kong Special Administrative Region (SAR); the recent risk assessment of LPG transport in the Territory, the measures developed to minimise the risks (including risk management improvements) and the risk management activities undertaken by the Government and the operators.

  5. Comparative Risk Analysis for Metropolitan Solid Waste Management Systems

    NASA Astrophysics Data System (ADS)

    Chang, Ni-Bin; Wang, S. F.

    1996-01-01

    Conventional solid waste management planning usually focuses on economic optimization, in which the related environmental impacts or risks are rarely considered. The purpose of this paper is to illustrate the methodology of how optimization concepts and techniques can be applied to structure and solve risk management problems such that the impacts of air pollution, leachate, traffic congestion, and noise increments can be regulated in the iong-term planning of metropolitan solid waste management systems. Management alternatives are sequentially evaluated by adding several environmental risk control constraints stepwise in an attempt to improve the management strategies and reduce the risk impacts in the long run. Statistics associated with those risk control mechanisms are presented as well. Siting, routing, and financial decision making in such solid waste management systems can also be achieved with respect to various resource limitations and disposal requirements.

  6. 48 CFR 1815.203-72 - Risk management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Risk management. 1815.203-72 Section 1815.203-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Proposals and Information 1815.203-72 Risk management. In all RFPs and RFOs for supplies or services for...

  7. 48 CFR 1815.203-72 - Risk management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Risk management. 1815.203-72 Section 1815.203-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Proposals and Information 1815.203-72 Risk management. In all RFPs and RFOs for supplies or services for...

  8. 48 CFR 1815.203-72 - Risk management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Risk management. 1815.203-72 Section 1815.203-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Proposals and Information 1815.203-72 Risk management. In all RFPs and RFOs for supplies or services for...

  9. 48 CFR 1815.203-72 - Risk management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Risk management. 1815.203-72 Section 1815.203-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Proposals and Information 1815.203-72 Risk management. In all RFPs and RFOs for supplies or services for...

  10. Risk evaluation mitigation strategies: the evolution of risk management policy.

    PubMed

    Hollingsworth, Kristen; Toscani, Michael

    2013-04-01

    The United States Food and Drug Administration (FDA) has the primary regulatory responsibility to ensure that medications are safe and effective both prior to drug approval and while the medication is being actively marketed by manufacturers. The responsibility for safe medications prior to marketing was signed into law in 1938 under the Federal Food, Drug, and Cosmetic Act; however, a significant risk management evolution has taken place since 1938. Additional federal rules, entitled the Food and Drug Administration Amendments Act, were established in 2007 and extended the government's oversight through the addition of a Risk Evaluation and Mitigation Strategy (REMS) for certain drugs. REMS is a mandated strategy to manage a known or potentially serious risk associated with a medication or biological product. Reasons for this extension of oversight were driven primarily by the FDA's movement to ensure that patients and providers are better informed of drug therapies and their specific benefits and risks prior to initiation. This article provides an historical perspective of the evolution of medication risk management policy and includes a review of REMS programs, an assessment of the positive and negative aspects of REMS, and provides suggestions for planning and measuring outcomes. In particular, this publication presents an overview of the evolution of the REMS program and its implications.

  11. The effect of rights-based fisheries management on risk taking and fishing safety.

    PubMed

    Pfeiffer, Lisa; Gratz, Trevor

    2016-03-08

    Commercial fishing is a dangerous occupation despite decades of regulatory initiatives aimed at making it safer. We posit that rights-based fisheries management (the individual allocation of fishing quota to vessels or fishing entities, also called catch shares) can improve safety by solving many of the problems associated with the competitive race to fish experienced in fisheries around the world. The competitive nature of such fisheries results in risky behavior such as fishing in poor weather, overloading vessels with fishing gear, and neglecting maintenance. Although not necessarily intended to address safety issues, catch shares eliminate many of the economic incentives to fish as rapidly as possible. We develop a dataset and methods to empirically evaluate the effects of the adoption of catch shares management on a particularly risky type of behavior: the propensity to fish in stormy weather. After catch shares was implemented in an economically important US West Coast fishery, a fisherman's probability of taking a fishing trip in high wind conditions decreased by 82% compared with only 31% in the former race to fish fishery. Overall, catch shares caused the average annual rate of fishing on high wind days to decrease by 79%. These results are evidence that institutional changes can significantly reduce individual, voluntary risk exposure and result in safer fisheries.

  12. Step 7: Choose the "Best" Risk Management Alternative

    USDA-ARS?s Scientific Manuscript database

    The ultimate purpose of the SRM tactical phase is to choose how to manage risk. Prior to this stage, we determined the sources of risk, identified the relevant management actions and estimated the likelihood of all known outcomes. Next, we combine this information with your personal risk preference...

  13. Risk Management and Crisis Response: Are You Prepared?

    ERIC Educational Resources Information Center

    Schirick, Ed

    2002-01-01

    How a camp responds to a crisis may determine whether it can survive financially. Effective risk management requires total commitment from ownership and management, and staff involvement. Steps in formulating a risk management plan include identifying all potential crises and their frequency and severity potential, developing responses,…

  14. Management of high-risk Myeloma: an evidence-based review of treatment strategies.

    PubMed

    Lehners, Nicola; Hayden, Patrick J; Goldschmidt, Hartmut; Raab, Marc-Steffen

    2016-08-01

    Despite the progress made in the treatment of patients with multiple myeloma over recent decades, a significant cohort with high-risk disease as defined by specific clinical and genetic criteria continue to respond poorly to standard treatment. These patients represent a particular challenge to the treating physician and require early identification as well as personalized treatment strategies. In this review, we discuss the prognostic impact of adverse clinical, radiological and genetic factors, evaluate available scoring systems and highlight key aspects of the therapeutic management of high-risk myeloma. MEDLINE and recent scientific meetings' databases were searched for the keywords 'high-risk' and 'multiple myeloma' and relevant studies relating to both diagnostic and therapeutic approaches were identified. Expert commentary: A case is made for intensive induction using combinations of novel agents, early high-dose therapy supported by autologous stem cell transplantation and the widespread use of maintenance therapies. Novel therapeutic options, especially in the field of immunotherapy, are currently explored in clinical trials and have the potential to further improve outcomes for patients with high-risk multiple myeloma.

  15. Integrating emerging earth science technologies into disaster risk management: an enterprise architecture approach

    NASA Astrophysics Data System (ADS)

    Evans, J. D.; Hao, W.; Chettri, S. R.

    2014-12-01

    Disaster risk management has grown to rely on earth observations, multi-source data analysis, numerical modeling, and interagency information sharing. The practice and outcomes of disaster risk management will likely undergo further change as several emerging earth science technologies come of age: mobile devices; location-based services; ubiquitous sensors; drones; small satellites; satellite direct readout; Big Data analytics; cloud computing; Web services for predictive modeling, semantic reconciliation, and collaboration; and many others. Integrating these new technologies well requires developing and adapting them to meet current needs; but also rethinking current practice to draw on new capabilities to reach additional objectives. This requires a holistic view of the disaster risk management enterprise and of the analytical or operational capabilities afforded by these technologies. One helpful tool for this assessment, the GEOSS Architecture for the Use of Remote Sensing Products in Disaster Management and Risk Assessment (Evans & Moe, 2013), considers all phases of the disaster risk management lifecycle for a comprehensive set of natural hazard types, and outlines common clusters of activities and their use of information and computation resources. We are using these architectural views, together with insights from current practice, to highlight effective, interrelated roles for emerging earth science technologies in disaster risk management. These roles may be helpful in creating roadmaps for research and development investment at national and international levels.

  16. [Application of risk grading and classification for occupational hazards in risk management for a shipbuilding project].

    PubMed

    Zeng, Wenfeng; Tan, Qiang; Wu, Shihua; Deng, Yingcong; Liu, Lifen; Wang, Zhi; Liu, Yimin

    2015-12-01

    To investigate the application of risk grading and classification for occupational hazards in risk management for a shipbuilding project. The risk management for this shipbuilding project was performed by a comprehensive application of MES evaluation, quality assessment of occupational health management, and risk grading and classification for occupational hazards, through the methods of occupational health survey, occupational health testing, and occupational health examinations. The results of MES evaluation showed that the risk of occupational hazards in this project was grade 3, which was considered as significant risk; Q value calculated by quality assessment of occupational health management was 0.52, which was considered to be unqualified; the comprehensive evaluation with these two methods showed that the integrated risk rating for this shipbuilding project was class D, and follow- up and rectification were needed with a focus on the improvement in health management. The application of MES evaluation and quality assessment of occupational health management in risk management for occupational hazards can achieve objective and reasonable conclusions and has good applicability.

  17. Community-based telemonitoring for hypertension management: practical challenges and potential solutions.

    PubMed

    Hovey, Lauren; Kaylor, Mary Beth; Alwan, Majd; Resnick, Helaine E

    2011-10-01

    Older adults residing in rural areas often lack convenient, patient-centered, community-based approaches to facilitate receipt of routine care to manage common chronic conditions. Without adequate access to appropriate disease management resources, the risk of seniors' experiencing acute events related to these common conditions increases substantially. Further, poorly managed chronic conditions are costly and place seniors at increased risk of institutionalization and permanent loss of independence. Novel, telehealth-based approaches to management of common chronic conditions like hypertension may not only improve the health of older adults, but may also lead to substantial cost savings associated with acute care episodes and institutionalization. The aim of this report is to summarize practical considerations related to operations and logistics of a unique community-based telemonitoring pilot study targeting rural seniors who utilize community-based senior centers. This article reviews the technological challenges encountered during the study and proposes solutions relevant to future research and implementation of telehealth in community-based, congregate settings.

  18. Risking a Debate--Redefining Risk and Risk Management: A New Zealand Case Study.

    ERIC Educational Resources Information Center

    Zink, Robyn; Leberman, Sarah

    2001-01-01

    Interviews with 12 New Zealand outdoor instructors found that they viewed risk as an opportunity to gain something of value, as opposed to losing something of value. Repositioning risk in this manner could allow the debate around adventure education to move away from being dominated by risk management, allowing consideration of adventure…

  19. Resilience and risk management in the urban project

    NASA Astrophysics Data System (ADS)

    Veyron, Jessica; Becue, Vincent; El Meouche, Rani; Barroca, Bruno

    2017-04-01

    Our study focus on the recourse of resilience concept in an urban environment coupled with risk management concerns. The urban resilience is subject to interpretation according to the expertise fields and the using context. It brings underlying concepts of time and space out. For its part, the urban environment is complex because of the elements multitude which makes up it on a dense area as much humanly, structurally, materially as functionally. The resilience polysemy rediscovers within the risk management and is confronted with the operational expectation that she arouses in this field. Between absorption, recovery, adaptability or else effectiveness, the level of requirement of the urban area could be abundant and varied to a system to another and in front of a risk to another. The capability of the urban systems to integrate the outstanding risk scope could be reinforce through the use of spatialisation tools. The access to these knowledge more and more widespread makes the changing of spatial and temporal scales thought easier in the urban project approach along with the sharing of citizen and territorial actions and innovations. Our work gets into position between resilience and urban planning. Based on bibliography and urban planning feedback in front of risks, we envisage to study the achievement of the urban planning in the field of vulnerable districts or buildings. Our aim tends torwards characterise urban resilience in risk field through spatialisation tool setting up.

  20. Causation in risk assessment and management: models, inference, biases, and a microbial risk-benefit case study.

    PubMed

    Cox, L A; Ricci, P F

    2005-04-01

    Causal inference of exposure-response relations from data is a challenging aspect of risk assessment with important implications for public and private risk management. Such inference, which is fundamentally empirical and based on exposure (or dose)-response models, seldom arises from a single set of data; rather, it requires integrating heterogeneous information from diverse sources and disciplines including epidemiology, toxicology, and cell and molecular biology. The causal aspects we discuss focus on these three aspects: drawing sound inferences about causal relations from one or more observational studies; addressing and resolving biases that can affect a single multivariate empirical exposure-response study; and applying the results from these considerations to the microbiological risk management of human health risks and benefits of a ban on antibiotic use in animals, in the context of banning enrofloxacin or macrolides, antibiotics used against bacterial illnesses in poultry, and the effects of such bans on changing the risk of human food-borne campylobacteriosis infections. The purposes of this paper are to describe novel causal methods for assessing empirical causation and inference; exemplify how to deal with biases that routinely arise in multivariate exposure- or dose-response modeling; and provide a simplified discussion of a case study of causal inference using microbial risk analysis as an example. The case study supports the conclusion that the human health benefits from a ban are unlikely to be greater than the excess human health risks that it could create, even when accounting for uncertainty. We conclude that quantitative causal analysis of risks is a preferable to qualitative assessments because it does not involve unjustified loss of information and is sound under the inferential use of risk results by management.

  1. Megacity Indicator System for Disaster Risk Management in Istanbul (MegaIST)

    NASA Astrophysics Data System (ADS)

    Yahya Menteşe, Emin; Kılıç, Osman; Baş, Mahmut; Khazai, Bijan; Ergün Konukcu, Betul; Emre Basmacı, Ahmet

    2017-04-01

    Decision makers need tools to understand the priorities and to set up benchmarks and track progress in their disaster risk reduction activities, so that they can justify their decisions and investments. In this regard, Megacity Indicator System for Disaster Risk Management (MegaIST), is developed in order to be used in disaster risk management studies, for decision makers and managers to establish right strategies and proper risk reduction actions, enhance resource management and investment decisions, set priorities, monitor progress in DRM and validate decisions taken with the aim of helping disaster oriented urban redevelopment, inform investors about risk profile of the city and providing a basis for dissemination and sharing of risk components with related stakeholders; by Directorate of Earthquake and Ground Research of Istanbul Metropolitan Municipality (IMM). MegaIST achieves these goals by analyzing the earthquake risk in three separate but complementary sub-categories consisting of "urban seismic risk, coping capacity and disaster risk management index" in an integrated way. MegaIST model fosters its analyses by presenting the outputs in a simple and user friendly format benefiting from GIS technology that ensures the adoptability of the model's use. Urban seismic risk analysis includes two components, namely; Physical Risk and Social Vulnerability Analysis. Physical risk analysis is based on the possible physical losses (such as building damage, casualties etc.) due to an earthquake while social vulnerability is considered as a factor that increases the results of the physical losses in correlation with the level of education, health, economic status and disaster awareness/preparedness of society. Coping capacity analysis is carried out with the aim of understanding the readiness of the Municipality to respond and recover from a disaster in Istanbul can be defined both in terms of the Municipality's operational capacities - the capacity of the

  2. Towards a conceptual framework of OSH risk management in smart working environments based on smart PPE, ambient intelligence and the Internet of Things technologies.

    PubMed

    Podgórski, Daniel; Majchrzycka, Katarzyna; Dąbrowska, Anna; Gralewicz, Grzegorz; Okrasa, Małgorzata

    2017-03-01

    Recent developments in domains of ambient intelligence (AmI), Internet of Things, cyber-physical systems (CPS), ubiquitous/pervasive computing, etc., have led to numerous attempts to apply ICT solutions in the occupational safety and health (OSH) area. A literature review reveals a wide range of examples of smart materials, smart personal protective equipment and other AmI applications that have been developed to improve workers' safety and health. Because the use of these solutions modifies work methods, increases complexity of production processes and introduces high dynamism into thus created smart working environments (SWE), a new conceptual framework for dynamic OSH management in SWE is called for. A proposed framework is based on a new paradigm of OSH risk management consisting of real-time risk assessment and the capacity to monitor the risk level of each worker individually. A rationale for context-based reasoning in SWE and a respective model of the SWE-dedicated CPS are also proposed.

  3. Overcoming Learning Aversion in Evaluating and Managing Uncertain Risks.

    PubMed

    Cox, Louis Anthony Tony

    2015-10-01

    Decision biases can distort cost-benefit evaluations of uncertain risks, leading to risk management policy decisions with predictably high retrospective regret. We argue that well-documented decision biases encourage learning aversion, or predictably suboptimal learning and premature decision making in the face of high uncertainty about the costs, risks, and benefits of proposed changes. Biases such as narrow framing, overconfidence, confirmation bias, optimism bias, ambiguity aversion, and hyperbolic discounting of the immediate costs and delayed benefits of learning, contribute to deficient individual and group learning, avoidance of information seeking, underestimation of the value of further information, and hence needlessly inaccurate risk-cost-benefit estimates and suboptimal risk management decisions. In practice, such biases can create predictable regret in selection of potential risk-reducing regulations. Low-regret learning strategies based on computational reinforcement learning models can potentially overcome some of these suboptimal decision processes by replacing aversion to uncertain probabilities with actions calculated to balance exploration (deliberate experimentation and uncertainty reduction) and exploitation (taking actions to maximize the sum of expected immediate reward, expected discounted future reward, and value of information). We discuss the proposed framework for understanding and overcoming learning aversion and for implementing low-regret learning strategies using regulation of air pollutants with uncertain health effects as an example. © 2015 Society for Risk Analysis.

  4. Retrospective analysis of Bluetongue farm risk profile definition, based on biology, farm management practices and climatic data.

    PubMed

    Cappai, Stefano; Loi, Federica; Coccollone, Annamaria; Contu, Marino; Capece, Paolo; Fiori, Michele; Canu, Simona; Foxi, Cipriano; Rolesu, Sandro

    2018-07-01

    Bluetongue (BT) is a vector-borne disease transmitted by species of Culicoides midges (Diptera: Ceratopogonidae). Many studies have contributed to clarifying various aspects of its aetiology, epidemiology and vector dynamic; however, BT remains a disease of epidemiological and economic importance that affects ruminants worldwide. Since 2000, the Sardinia region has been the most affected area of the Mediterranean basin. The region is characterised by wide pastoral areas for sheep and represents the most likely candidate region for the study of Bluetongue virus (BTV) distribution and prevalence in Italy. Furthermore, specific information on the farm level and epidemiological studies needs to be provided to increase the knowledge on the disease's spread and to provide valid mitigation strategies in Sardinia. This study conducted a punctual investigation into the spatial patterns of BTV transmission to define a risk profile for all Sardinian farmsby using a logistic multilevel mixed model that take into account agro-meteorological aspects, as well as farm characteristics and management. Data about animal density (i.e. sheep, goats and cattle), vaccination, previous outbreaks, altitude, land use, rainfall, evapotranspiration, water surface, and farm management practices (i.e. use of repellents, treatment against insect vectors, storage of animals in shelter overnight, cleaning, presence of mud and manure) were collected for 12,277 farms for the years 2011-2015. The logistic multilevel mixed model showed the fundamental role of climatic factors in disease development and the protective role of good management, vaccination, outbreak in the previous year and altitude. Regional BTV risk maps were developed, based on the predictor values of logistic model results, and updated every 10 days. These maps were used to identify, 20 days in advance, the areas at highest risk. The risk farm profile, as defined by the model, would provide specific information about the role of each

  5. Iatrogenic disease management: moderating medication errors and risks in a pharmacy benefit management environment.

    PubMed

    Nair, Vinit; Salmon, J Warren; Kaul, Alan F

    2007-12-01

    Disease Management (DM) programs have advanced to address costly chronic disease patterns in populations. This is in part due to the programs' significant clinical and economical value, coupled with interest by pharmaceutical manufacturers, managed care organizations, and pharmacy benefit management firms. While cost containment realizations for many such interventions have been less than anticipated, this article explores potentials in marrying Medication Error Risk Reduction into DM programs within managed care environments. Medication errors are an emergent serious problem now gaining attention in US health policy. They represent a failure within population-based health programs because they remain significant cost drivers. Therefore, medication errors should be addressed in an organized fashion, with DM being a worthy candidate for piggybacking such programs to achieve the best synergistic effects.

  6. Managing risk: clinical decision-making in mental health services.

    PubMed

    Muir-Cochrane, Eimear; Gerace, Adam; Mosel, Krista; O'Kane, Debra; Barkway, Patricia; Curren, David; Oster, Candice

    2011-01-01

    Risk assessment and management is a major component of contemporary mental health practice. Risk assessment in health care exists within contemporary perspectives of management and risk aversive practices in health care. This has led to much discussion about the best approach to assessing possible risks posed by people with mental health problems. In addition, researchers and commentators have expressed concern that clinical practice is being dominated by managerial models of risk management at the expense of meeting the patient's health and social care needs. The purpose of the present study is to investigate the risk assessment practices of a multidisciplinary mental health service. Findings indicate that mental health professionals draw on both managerial and therapeutic approaches to risk management, integrating these approaches into their clinical practice. Rather than being dominated by managerial concerns regarding risk, the participants demonstrate professional autonomy and concern for the needs of their clients.

  7. Case histories in pharmaceutical risk management.

    PubMed

    McCormick, Cynthia G; Henningfield, Jack E; Haddox, J David; Varughese, Sajan; Lindholm, Anders; Rosen, Susan; Wissel, Janne; Waxman, Deborah; Carter, Lawrence P; Seeger, Vickie; Johnson, Rolley E

    2009-12-01

    The development and implementation of programs in the U.S. to minimize risks and assess unintended consequences of new medications has been increasingly required by the Food and Drug Administration (FDA) since the mid 1990s. This paper provides four case histories of risk management and post-marketing surveillance programs utilized recently to address problems associated with possible abuse, dependence and diversion. The pharmaceutical sponsors of each of these drugs were invited to present their programs and followed a similar template for their summaries that are included in this article. The drugs and presenting companies were OxyContin, an analgesic marketed by Purdue Pharma L.P., Daytrana and Vyvanse, ADHD medications marketed by Shire Pharmaceuticals, Xyrem for narcolepsy marketed by Jazz Pharmaceuticals, and Subutex and Suboxone for opioid dependence marketed by Reckitt Benckiser Pharmaceuticals Inc. These case histories and subsequent discussions provide invaluable real-world examples and illustrate both the promise of risk management programs in providing a path to market and/or for keeping on the market drugs with serious potential risks. They also illustrate the limitations of such programs in actually controlling unintended consequences, as well as the challenge of finding the right balance of reducing risks without posing undue barriers to patient access. These experiences are highly relevant as the FDA increasingly requires pharmaceutical sponsors to develop and implement the more formalized and enforceable versions of the risk management term Risk Evaluation and Mitigation Strategies (REMS).

  8. 12 CFR 615.5135 - Management of interest rate risk.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 6 2011-01-01 2011-01-01 false Management of interest rate risk. 615.5135... agricultural credit bank shall develop and implement an interest rate risk management program as set forth in subpart G of this part. The board of directors shall adopt an interest rate risk management section of an...

  9. 12 CFR 615.5135 - Management of interest rate risk.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Management of interest rate risk. 615.5135... agricultural credit bank shall develop and implement an interest rate risk management program as set forth in subpart G of this part. The board of directors shall adopt an interest rate risk management section of an...

  10. Risk in fire management decisionmaking: techniques and criteria

    Treesearch

    Gail Blatternberger; William F. Hyde; Thomas J. Mills

    1984-01-01

    In the past, decisionmaking in wildland fire management generally has not included a full consideration of the risk and uncertainty that is inherent in evaluating alternatives. Fire management policies in some Federal land management agencies now require risk evaluation. The model for estimating the economic efficiency of fire program alternatives is the minimization...

  11. Bayesian-network-based safety risk assessment for steel construction projects.

    PubMed

    Leu, Sou-Sen; Chang, Ching-Miao

    2013-05-01

    There are four primary accident types at steel building construction (SC) projects: falls (tumbles), object falls, object collapse, and electrocution. Several systematic safety risk assessment approaches, such as fault tree analysis (FTA) and failure mode and effect criticality analysis (FMECA), have been used to evaluate safety risks at SC projects. However, these traditional methods ineffectively address dependencies among safety factors at various levels that fail to provide early warnings to prevent occupational accidents. To overcome the limitations of traditional approaches, this study addresses the development of a safety risk-assessment model for SC projects by establishing the Bayesian networks (BN) based on fault tree (FT) transformation. The BN-based safety risk-assessment model was validated against the safety inspection records of six SC building projects and nine projects in which site accidents occurred. The ranks of posterior probabilities from the BN model were highly consistent with the accidents that occurred at each project site. The model accurately provides site safety-management abilities by calculating the probabilities of safety risks and further analyzing the causes of accidents based on their relationships in BNs. In practice, based on the analysis of accident risks and significant safety factors, proper preventive safety management strategies can be established to reduce the occurrence of accidents on SC sites. Copyright © 2013 Elsevier Ltd. All rights reserved.

  12. Improving Our Odds: Success through Continuous Risk Management

    NASA Technical Reports Server (NTRS)

    Greenhalgh, Phillip O.

    2009-01-01

    Launching a rocket, running a business, driving to work and even day-to-day living all involve some degree of risk. Risk is ever present yet not always recognized, adequately assessed and appropriately mitigated. Identification, assessment and mitigation of risk are elements of the risk management component of the "continuous improvement" way of life that has become a hallmark of successful and progressive enterprises. While the application of risk management techniques to provide continuous improvement may be detailed and extensive, the philosophy, ideals and tools can be beneficially applied to all situations. Experiences with the use of risk identification, assessment and mitigation techniques for complex systems and processes are described. System safety efforts and tools used to examine potential risks of the Ares I First Stage of NASA s new Constellation Crew Launch Vehicle (CLV) presently being designed are noted as examples. Recommendations from lessons learned are provided for the application of risk management during the development of new systems as well as for the improvement of existing systems. Lessons learned and suggestions given are also examined for applicability to simple systems, uncomplicated processes and routine personal daily tasks. This paper informs the reader of varied uses of risk management efforts and techniques to identify, assess and mitigate risk for improvement of products, success of business, protection of people and enhancement of personal life.

  13. Therapeutic Risk and Benefits of Concomitantly Using Herbal Medicines and Conventional Medicines: From the Perspectives of Evidence Based on Randomized Controlled Trials and Clinical Risk Management

    PubMed Central

    Zhang, Xiu-lai; Chen, Meng; Zhu, Ling-ling

    2017-01-01

    Despite increased awareness of the potential of herb-drug interactions (HDIs), the lack of rigorous clinical evidence regarding the significance provides a challenge for clinicians and consumers to make rational decisions about the safe combination of herbal and conventional medicines. This review addressed HDIs based on evidence from randomized controlled trials (RCTs). Literature was identified by performing a PubMed search till January 2017. Risk description and clinical risk management were described. Among 74 finally included RCTs, 17 RCTs (22.97%) simply addressed pharmacodynamic HDIs. Fifty-seven RCTs (77.03%) investigated pharmacokinetic HDIs and twenty-eight of them showed potential or actual clinical relevance. The extent of an HDI may be associated with the factors such as pharmacogenomics, dose of active ingredients in herbs, time course of interaction, characteristics of the object drugs (e.g., administration routes and pharmacokinetic profiles), modification of herbal prescription compositions, and coexistence of inducers and inhibitors. Clinical professionals should enhance risk management on HDIs such as increasing awareness of potential changes in therapeutic risk and benefits, inquiring patients about all currently used conventional medicines and herbal medicines and supplements, automatically detecting highly substantial significant HDI by computerized reminder system, selecting the alternatives, adjusting dose, reviewing the appropriateness of physician orders, educating patients to monitor for drug-interaction symptoms, and paying attention to follow-up visit and consultation. PMID:28491115

  14. A Bayesian network approach for causal inferences in pesticide risk assessment and management

    EPA Science Inventory

    Pesticide risk assessment and management must balance societal benefits and ecosystem protection, based on quantified risks and the strength of the causal linkages between uses of the pesticide and socioeconomic and ecological endpoints of concern. A Bayesian network (BN) is a gr...

  15. Implementing the EU Floods Directive (2007/60/EC) in Austria: Flood Risk Management Plans

    NASA Astrophysics Data System (ADS)

    Neuhold, Clemens

    2013-04-01

    he Directive 2007/60/EC of the European Parliament and of the Council of 23 October 2007 on the assessment and management of flood risks (EFD) aims at the reduction of the adverse consequences for human health, the environment, cultural heritage and economic activity associated with floods in the Community. This task is to be achieved based on three process steps (1) preliminary flood risk assessment (finalised by the end of 2011), (2) flood hazard maps and flood risk maps (due 2013) and (3) flood risk management plans (due 2015). Currently, an interdisciplinary national working group is defining the methodological framework for flood risk management plans in Austria supported by a constant exchange with international bodies and experts. Referring to the EFD the components of the flood risk management plan are (excerpt): 1. conclusions of the preliminary flood risk assessment 2. flood hazard maps and flood risk maps and the conclusions that can be drawn from those maps 3. a description of the appropriate objectives of flood risk management 4. a summary of measures and their prioritisation aiming to achieve the appropriate objectives of flood risk management The poster refers to some of the major challenges in this process, such as the legal provisions, coordination of administrative units, definition of public relations, etc. The implementation of the EFD requires the harmonisation of legal instruments of various disciplines (e.g. water management, spatial planning, civil protection) enabling a coordinated - and ideally binding - practice of flood risk management. This process is highly influenced by the administrative organisation in Austria - federal, provincial and municipality level. The Austrian approach meets this organisational framework by structuring the development of the flood risk management plan into 3 time-steps: (a) federal blueprint, (b) provincial editing and (c) federal finishing as well as reporting to the European Commission. Each time

  16. Risk management measures for chemicals: the "COSHH essentials" approach.

    PubMed

    Garrod, A N I; Evans, P G; Davy, C W

    2007-12-01

    "COSHH essentials" was developed in Great Britain to help duty holders comply with the Control of Substances Hazardous to Health (COSHH) Regulations. It uses a similar approach to that described in the new European "REACH" Regulation (Registration, Evaluation, Authorisation and Restriction of Chemicals; EC No. 1907/2006 of the European Parliament), insofar as it identifies measures for managing the risk for specified exposure scenarios. It can therefore assist REACH duty holders with the identification and communication of appropriate risk-management measures. The technical basis for COSHH essentials is explained in the original papers published in the Annals of Occupational Hygiene. Its details will, therefore, not be described here; rather, its ability to provide a suitable means for communicating risk-management measures will be explored. COSHH essentials is a simple tool based on an empirical approach to risk assessment and risk management. The output is a "Control Guidance Sheet" that lists the "dos" and "don'ts" for control in a specific task scenario. The guidance in COSHH essentials recognises that exposure in the workplace will depend not just on mechanical controls, but also on a number of other factors, including administrative and behavioural controls, such as systems of work, supervision and training. In 2002, COSHH essentials was made freely available via the internet (http://www.coshh-essentials.org.uk/). This electronic delivery enabled links to be made between product series that share tasks, such as drum filling, and with ancillary guidance, such as setting up health surveillance for work with a respiratory sensitiser. COSHH essentials has proved to be a popular tool for communicating good control practice. It has attracted over 1 million visits to its site since its launch. It offers a common benchmark of good practice for chemical users, manufacturers, suppliers and importers, as well as regulators and health professionals.

  17. Risk-based decision making to manage water quality failures caused by combined sewer overflows

    NASA Astrophysics Data System (ADS)

    Sriwastava, A. K.; Torres-Matallana, J. A.; Tait, S.; Schellart, A.

    2017-12-01

    Regulatory authorities set certain environmental permit for water utilities such that the combined sewer overflows (CSO) managed by these companies conform to the regulations. These utility companies face the risk of paying penalty or negative publicity in case they breach the environmental permit. These risks can be addressed by designing appropriate solutions such as investing in additional infrastructure which improve the system capacity and reduce the impact of CSO spills. The performance of these solutions is often estimated using urban drainage models. Hence, any uncertainty in these models can have a significant effect on the decision making process. This study outlines a risk-based decision making approach to address water quality failure caused by CSO spills. A calibrated lumped urban drainage model is used to simulate CSO spill quality in Haute-Sûre catchment in Luxembourg. Uncertainty in rainfall and model parameters is propagated through Monte Carlo simulations to quantify uncertainty in the concentration of ammonia in the CSO spill. A combination of decision alternatives such as the construction of a storage tank at the CSO and the reduction in the flow contribution of catchment surfaces are selected as planning measures to avoid the water quality failure. Failure is defined as exceedance of a concentration-duration based threshold based on Austrian emission standards for ammonia (De Toffol, 2006) with a certain frequency. For each decision alternative, uncertainty quantification results into a probability distribution of the number of annual CSO spill events which exceed the threshold. For each alternative, a buffered failure probability as defined in Rockafellar & Royset (2010), is estimated. Buffered failure probability (pbf) is a conservative estimate of failure probability (pf), however, unlike failure probability, it includes information about the upper tail of the distribution. A pareto-optimal set of solutions is obtained by performing mean

  18. Cardiovascular disease risk factors: prevalence and management in adult hemophilia patients.

    PubMed

    Lim, Ming Y; Pruthi, Rajiv K

    2011-07-01

    With increasing longevity, the prevalence of cardiovascular disease (CVD) risk factors in hemophilia patients is expected to increase; however, evidence-based guidelines on management are lacking. The aim of the study was to determine the prevalence and management of CVD risk factors in hemophilia patients. A retrospective study of 58 adult hemophilia patients (≥35 years) attending Mayo Comprehensive Hemophilia Center between 1 January 2006 and 15 October 2009 were reviewed. The prevalence of CVD risk factors was hypertension 65.5%, diabetes 10.3%, smoking 12.5% and obesity 19.6%. A total of 31% did not have a lipid profile on record. Management of risk factors included antihypertensive medications in 84.2% and lipid-lowering agents in 12.1%. During their medical evaluation, four of seven active smokers received smoking cessation counseling and four of 11 obese patients received lifestyle modification advice. Eight patients (13.8%) experienced a CVD event: myocardial infarction (MI) (n=3), coronary artery disease (n=2), both MI and ischemic stroke (n=1) and hemorrhagic strokes (n=2). Only five of eight patients were on low-dose aspirin, of which aspirin was discontinued in one patient after he was diagnosed with hemophilia following a bleeding work-up. Another patient on dual antiplatelet therapy post stent placement developed epistaxis resulting in clopidogrel cessation. Hemophilia patients are at risk for CVD, similar to the general age-matched male population. Screening for CVD risk factors, with preventive dietary and pharmacologic interventions, play a key role in the prevention and long-term management of CVD. Collaborative efforts between primary care providers, cardiologists and hemophilia center specialists remain essential in managing these complex patients.

  19. Advances in management of low-risk febrile neutropenia.

    PubMed

    Teuffel, Oliver; Sung, Lillian

    2012-02-01

    To describe and discuss the most recent advances in the management of low-risk febrile neutropenia in children with cancer. Several risk stratification tools for children with febrile neutropenia have been developed, although none of these tools have been directly compared and few have been validated in independent populations. However, there is good evidence that, for pediatric patients with febrile neutropenia at low risk for severe infection, outpatient management is a well tolerated and efficacious alternative to inpatient care. Moreover, major progress has been made in obtaining and understanding perceived quality of life and preferences for outpatient management in pediatric cancer patients. Many parents prefer inpatient management although child quality of life is, in general, anticipated to be higher with outpatient intravenous therapy. Finally, outpatient strategies are more cost-effective as compared with traditional management in hospital. Outpatient management is a well tolerated and cost-effective strategy for low-risk febrile neutropenia in children with cancer, although parental preferences are highly variable for outpatient versus inpatient management. Future research should examine the effectiveness of outpatient strategies through conduct of large cohort studies. Other future work could focus on development of decision aids and other tools to facilitate ambulatory approaches.

  20. Community-Based Disaster Management: A Lesson Learned From Community Emergency Response Management in Banyumas, Indonesia

    NASA Astrophysics Data System (ADS)

    Pratama, A. Y.; Sariffuddin, S.

    2018-02-01

    This article aimed to review community-based disaster management in terms of its independent coordination and disaster management. Community resilience was tested during disaster emergency. While panic, the community is required to be viable and able to evacuate, manage logistic, collect data on damage and the victim, and coordinate with outsiders independently. The community in Gununglurah Village, Banyumas Regency which was hit by a landslide in 2015 provides a lesson learned about community based disaster management. This research used qualitative descriptive methodology with in-depth interview with 23 informants from the community, donor institution, village officers, and government officers. Through traditional and informal methods, the community implemented disaster management that was categorized into 3 mechanisms that were social, functional, and sequential mechanism. These mechanisms controlled different portion in which social mechanism holds the most important role in disaster management, then functional mechanism and sequential mechanism. Various community activities in the village equipped the community with organizational experience to manage logistic, human resource and other coordination. In 2007, in fact, there was vulnerability risk assessment done by the local government, which recommended efforts to be done by the community to reduce the disaster risk, yet it was not implemented. It was interesting to note that in spite of the independent disaster management there was a scientific assessment neglected. Based on this research, a new discussion on how to synchronize the endogenous knowledge with scientific modern knowledge was opened.

  1. Risk Management Plan Rule

    EPA Pesticide Factsheets

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  2. Risk management in medical product development process using traditional FMEA and fuzzy linguistic approach: a case study

    NASA Astrophysics Data System (ADS)

    Kirkire, Milind Shrikant; Rane, Santosh B.; Jadhav, Jagdish Rajaram

    2015-12-01

    Medical product development (MPD) process is highly multidisciplinary in nature, which increases the complexity and the associated risks. Managing the risks during MPD process is very crucial. The objective of this research is to explore risks during MPD in a dental product manufacturing company and propose a model for risk mitigation during MPD process to minimize failure events. A case study approach is employed. The existing MPD process is mapped with five phases of the customized phase gate process. The activities during each phase of development and risks associated with each activity are identified and categorized based on the source of occurrence. The risks are analyzed using traditional Failure mode and effect analysis (FMEA) and fuzzy FMEA. The results of two methods when compared show that fuzzy approach avoids the duplication of RPNs and helps more to convert cognition of experts into information to get values of risk factors. The critical, moderate, low level and negligible risks are identified based on criticality; risk treatments and mitigation model are proposed. During initial phases of MPD, the risks are less severe, but as the process progresses the severity of risks goes on increasing. The MPD process should be critically designed and simulated to minimize the number of risk events and their severity. To successfully develop the products/devices within the manufacturing companies, the process risk management is very essential. A systematic approach to manage risks during MPD process will lead to the development of medical products with expected quality and reliability. This is the first research of its kind having focus on MPD process risks and its management. The methodology adopted in this paper will help the developers, managers and researchers to have a competitive edge over the other companies by managing the risks during the development process.

  3. 12 CFR 567.6 - Risk-based capital credit risk-weight categories.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... strips receivable, other than credit-enhancing interest-only strips; (N)-(O) [Reserved] (P) That portion...'s risk management system that explicitly incorporates the full range of risks arising from the... management or loan review personnel to assign or review the credit risk ratings; (7) Include an internal...

  4. 12 CFR 567.6 - Risk-based capital credit risk-weight categories.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... strips receivable, other than credit-enhancing interest-only strips; (N)-(O) [Reserved] (P) That portion...'s risk management system that explicitly incorporates the full range of risks arising from the... management or loan review personnel to assign or review the credit risk ratings; (7) Include an internal...

  5. MAVEN Information Security Governance, Risk Management, and Compliance (GRC): Lessons Learned

    NASA Technical Reports Server (NTRS)

    Takamura, Eduardo; Gomez-Rosa, Carlos A.; Mangum, Kevin; Wasiak, Fran

    2014-01-01

    As the first interplanetary mission managed by the NASA Goddard Space Flight Center, the Mars Atmosphere and Volatile EvolutioN (MAVEN) had three IT security goals for its ground system: COMPLIANCE, (IT) RISK REDUCTION, and COST REDUCTION. In a multiorganizational environment in which government, industry and academia work together in support of the ground system and mission operations, information security governance, risk management, and compliance (GRC) becomes a challenge as each component of the ground system has and follows its own set of IT security requirements. These requirements are not necessarily the same or even similar to each other's, making the auditing of the ground system security a challenging feat. A combination of standards-based information security management based on the National Institute of Standards and Technology (NIST) Risk Management Framework (RMF), due diligence by the Mission's leadership, and effective collaboration among all elements of the ground system enabled MAVEN to successfully meet NASA's requirements for IT security, and therefore meet Federal Information Security Management Act (FISMA) mandate on the Agency. Throughout the implementation of GRC on MAVEN during the early stages of the mission development, the Project faced many challenges some of which have been identified in this paper. The purpose of this paper is to document these challenges, and provide a brief analysis of the lessons MAVEN learned. The historical information documented herein, derived from an internal pre-launch lessons learned analysis, can be used by current and future missions and organizations implementing and auditing GRC.

  6. Understanding Suicide Across the Lifespan: A United States Perspective of Suicide Risk Factors, Assessment & Management.

    PubMed

    Steele, Ian H; Thrower, Natasha; Noroian, Paul; Saleh, Fabian M

    2018-01-01

    Suicide is a troubling, preventable phenomenon. Prior to attempts, individuals often seek help, prompting practitioners to perform risk assessments that ideally use evidence-based risk management strategies. A literature review was performed using Harvard Countway Library of Medicine, Google Scholar, PubMed. Key words used were "Forensic Science," "Suicide Risk Management," "Pediatric Suicide Risk Factors," "Adult Suicide Risk Factors," "Geriatric Suicide Risk Factors," "Suicide Risk Assessment." Parameters limited articles to studies/reviews completed in the past twenty years in the United States. Results indicated predictors of suicide in juveniles were insomnia, burdensomeness, and recent conflicts with family or a romantic partner. Adults had greater risk if male, substance abusing, with marital/job loss. Elderly individuals with multiple medical comorbidities, hopelessness, and isolation were at higher risk. Everyone evaluated should be screened for access to firearms. Management of suicide risk involves providing the least restrictive form of treatment which maintains an individual's safety. © 2017 American Academy of Forensic Sciences.

  7. The risk management professional and medication safety.

    PubMed

    Cohen, Hedy; Tuohy, Nancy; Carroll, Roberta

    2009-01-01

    ASHRM is committed to the future development of the healthcare risk management profession. A key contribution to this commitment is the creation of a student version of ASHRM's best-selling Risk Management Handbook for Healthcare Organizations. The Student Edition was released this spring. It is now being made available to universities and colleges to incorporate into their degree programs.

  8. Sunway Medical Laboratory Quality Control Plans Based on Six Sigma, Risk Management and Uncertainty.

    PubMed

    Jairaman, Jamuna; Sakiman, Zarinah; Li, Lee Suan

    2017-03-01

    Sunway Medical Centre (SunMed) implemented Six Sigma, measurement uncertainty, and risk management after the CLSI EP23 Individualized Quality Control Plan approach. Despite the differences in all three approaches, each implementation was beneficial to the laboratory, and none was in conflict with another approach. A synthesis of these approaches, built on a solid foundation of quality control planning, can help build a strong quality management system for the entire laboratory. Copyright © 2016 Elsevier Inc. All rights reserved.

  9. RISK MANAGEMENT EVALUATION FOR CONCENTRATED ANIMAL FEEDING OPERATIONS

    EPA Science Inventory

    The National Risk Management Research Laboratory (NRMRL) developed a Risk Management Evaluation (RME) to provide information needed to help plan future research in the Laboratory dealing with the environmental impact of concentrated animal feeding operations (CAFOs). Agriculture...

  10. Major Management Challenges and Program Risks. Department of Education

    DTIC Science & Technology

    2001-01-01

    GAO United States General Accounting Office Performance and Accountability SeriesJanuary 2001 Major Management Challenges and Program Risks ...34) Title and Subtitle Major Management Challenges and Program Risks Department of Education Contract or Grant Number Program Element Number Authors...Accountability Series: Major Management Challenges and Program Risks . In that series, GAO advised the Congress that it planned to reassess the

  11. International Conference on Harmonisation; guidance on Q9 Quality Risk Management; availability. Notice.

    PubMed

    2006-06-02

    The Food and Drug Administration (FDA) is announcing the availability of a guidance entitled "Q9 Quality Risk Management."' The guidance was prepared under the auspices of the International Conference on Harmonisation of Technical Requirements for Registration of Pharmaceuticals for Human Use (ICH). The guidance provides principles and examples of tools for quality risk management that can be applied to all aspects of pharmaceutical quality throughout the lifecycle of drug substances, drug products, and biological and biotechnological products. The guidance is intended to enable regulators and industry to make more effective and consistent risk-based decisions.

  12. 77 FR 30517 - Electricity Subsector Cybersecurity Risk Management Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF ENERGY Electricity Subsector Cybersecurity Risk Management Process AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION: Notice of publication. SUMMARY... Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk...

  13. HIV testing and sexual risk reduction counseling in office-based buprenorphine/naloxone treatment.

    PubMed

    Edelman, E Jennifer; Moore, Brent A; Caffrey, Sarah; Sikkema, Kathleen J; Jones, Emlyn S; Schottenfeld, Richard S; Fiellin, David A; Fiellin, Lynn E

    2013-01-01

    We assessed the feasibility and preliminary efficacy of human immunodeficiency virus (HIV) testing with sexual risk reduction counseling for opioid-dependent patients initiating office-based buprenorphine/naloxone treatment. We conducted a 14-week randomized, controlled trial with 30 patients (original target of 114) assigned to receive buprenorphine/naloxone induction/stabilization and HIV testing with Brief Sexual Risk Management (BSRM) or Enhanced Sexual Risk Management (ESRM). We evaluated process measures and compared outcomes at baseline and during the 3-month follow-up. Similar proportions of patients receiving BSRM and ESRM underwent HIV testing (93% vs 80%; P = 0.28) and completed counseling sessions (80% vs 67%; P = 0.40). Brief Sexual Risk Management sessions were shorter than ESRM sessions (15.4 vs 23.4 minutes), with comparable manual adherence (P = 0.80). Outcomes did not vary by BSRM versus ESRM. Although the recruitment of opioid-dependent patients with sexual risk behaviors is challenging, HIV testing with sexual risk reduction counseling in office-based buprenorphine/naloxone treatment practice is feasible. Interventions to decrease sexual risk behaviors among a segment of this population are necessary.

  14. Managing the unmanageable: risk assessment and risk management in contemporary professional practice.

    PubMed

    Raven, J; Rix, P

    1999-07-01

    This study sets out to investigate the theories and practices of risk assessment and management in the context of contemporary mental health practice. Although risk assessment and management policies are well established for those working in the field of community mental health care, there are noticeable anomalies and regional variations, in the criteria, procedures and decision-making strategies used. Focus group taped interviews were conducted with over 100 mental health professionals in one NHS Trust. These were compared with an extensive literature review on the topic. The main theme to emerge was lack of resources, which included time and staff in the context of a changing and increasing workload. Another important theme was the lack of access to centralized and accurate information about mental health service provision. It is essential that professionals, clients, their families and the public feel confident in professional judgements and practices to avoid a 'back to the asylum' lobby, for the care and treatment of seriously mentally ill individuals.

  15. Development and implementation of a business continuity management risk index.

    PubMed

    Kadar, Michael

    This paper will present the building blocks for developing and implementing the BCM risk index; whether it is used as a comprehensive metric for risk or preparedness. This paper introduces the concept of a business continuity management (BCM) risk index--a comprehensive metric that measures and reports the status of the primary 'intended outcome' of the BCM programme to top management. In addition to measuring the primary programme output,;the BCM risk index can be used to demonstrate the overall value of the BCM programme to executive management. This is accomplished because the BCM risk index allows quantitative measurement of current risk levels and their comparison with established risk tolerances. The BCM Risk Index can provide executive management with reports on the risk level of individual business units, departments, subsidiaries or the enterprise in a way that drives both risk management and BCM initiatives. The name 'risk index' can be misleading, however. The BCM risk index concept can also be used to measure preparedness levels. In fact, implementation at DTE Energy has resulted in calling it the 'preparedness index', which is used to measure and report preparedness levels rather than risk levels.

  16. Integrating physical and financial approaches to manage environmental financial risk

    NASA Astrophysics Data System (ADS)

    Characklis, Gregory; Meyer, Eliot; Foster, Benjamin

    2017-04-01

    Physical and/or engineered solutions have long been used to manage risks associated with adverse environmental events. Examples include reservoirs as a tool for mitigating drought-related supply risk, levees for managing flood risk and dredging of inland waterways to ensure navigability during low flow periods. These measures can reduce many types of risk (e.g., loss of life), but are often employed as a means of protecting against financial losses. When the focus is on managing environmental financial risk, physical solutions can be effective, but also costly. In many cases, non-physical tools can provide a less expensive means of managing financial risk, with these often taking the form of financial instruments such as hedging contracts, contingency funds or insurance. Some of these instruments, such as flood insurance, are widely available, but historically many environmental financial risks have been managed primarily (or solely) via physical solutions without much consideration of alternatives, thereby opening opportunities for innovation in developing financial solutions. Recent research has demonstrated that financial instruments can play a significant role in managing drought-related financial risk in sectors as diverse as water utilities, energy generation and inland navigation. Nonetheless, this work has largely considered the use of these instruments within systems in which physical solutions are already in place (but failing to achieve desired performance). The next step in the evolution of managing environmental financial risk involves developing methods for designing risk management strategies that do not assume an established physical system. Here the goal is to identify the relative role that physical solutions and financial instruments should play as they are integrated into a comprehensive risk management strategy. This is not a straightforward challenge as one approach reduces the risk of financial losses and the other redistributes those losses

  17. A randomised controlled trial testing a web-based, computer-tailored self-management intervention for people with or at risk for chronic obstructive pulmonary disease: a study protocol

    PubMed Central

    2013-01-01

    Background Chronic Obstructive Pulmonary Disease (COPD) is a major cause of morbidity and mortality. Effective self-management support interventions are needed to improve the health and functional status of people with COPD or at risk for COPD. Computer-tailored technology could be an effective way to provide this support. Methods/Design This paper presents the protocol of a randomised controlled trial testing the effectiveness of a web-based, computer-tailored self-management intervention to change health behaviours of people with or at risk for COPD. An intervention group will be compared to a usual care control group, in which the intervention group will receive a web-based, computer-tailored self-management intervention. Participants will be recruited from an online panel and through general practices. Outcomes will be measured at baseline and at 6 months. The primary outcomes will be smoking behaviour, measuring the 7-day point prevalence abstinence and physical activity, measured in minutes. Secondary outcomes will include dyspnoea score, quality of life, stages of change, intention to change behaviour and alternative smoking behaviour measures, including current smoking behaviour, 24-hour point prevalence abstinence, prolonged abstinence, continued abstinence and number of quit attempts. Discussion To the best of our knowledge, this will be the first randomised controlled trial to test the effectiveness of a web-based, computer-tailored self-management intervention for people with or at risk for COPD. The results will be important to explore the possible benefits of computer-tailored interventions for the self-management of people with or at risk for COPD and potentially other chronic health conditions. Dutch trial register NTR3421 PMID:23742208

  18. Risk-based water resources planning: Incorporating probabilistic nonstationary climate uncertainties

    NASA Astrophysics Data System (ADS)

    Borgomeo, Edoardo; Hall, Jim W.; Fung, Fai; Watts, Glenn; Colquhoun, Keith; Lambert, Chris

    2014-08-01

    We present a risk-based approach for incorporating nonstationary probabilistic climate projections into long-term water resources planning. The proposed methodology uses nonstationary synthetic time series of future climates obtained via a stochastic weather generator based on the UK Climate Projections (UKCP09) to construct a probability distribution of the frequency of water shortages in the future. The UKCP09 projections extend well beyond the range of current hydrological variability, providing the basis for testing the robustness of water resources management plans to future climate-related uncertainties. The nonstationary nature of the projections combined with the stochastic simulation approach allows for extensive sampling of climatic variability conditioned on climate model outputs. The probability of exceeding planned frequencies of water shortages of varying severity (defined as Levels of Service for the water supply utility company) is used as a risk metric for water resources planning. Different sources of uncertainty, including demand-side uncertainties, are considered simultaneously and their impact on the risk metric is evaluated. Supply-side and demand-side management strategies can be compared based on how cost-effective they are at reducing risks to acceptable levels. A case study based on a water supply system in London (UK) is presented to illustrate the methodology. Results indicate an increase in the probability of exceeding the planned Levels of Service across the planning horizon. Under a 1% per annum population growth scenario, the probability of exceeding the planned Levels of Service is as high as 0.5 by 2040. The case study also illustrates how a combination of supply and demand management options may be required to reduce the risk of water shortages.

  19. OVERVIEW OF THE INTRAMURAL RISK MANAGEMENT RESEARCH PROGRAM

    EPA Science Inventory

    This presentation will provide a summary of the risk management portion of ORD's endocrine disrupting chemicals (EDCs) research program, including its motivation, goals, planning efforts and resulting research areas.

    In an emerging research area like EDCs, risk management ...

  20. Tank waste remediation system tank waste retrieval risk management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klimper, S.C.

    1997-11-07

    This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure.

  1. RiskLab - a joint Teaching Lab on Hazard and Risk Management

    NASA Astrophysics Data System (ADS)

    Baruffini, Mi.; Baruffini, Mo.; Thuering, M.

    2009-04-01

    In the future natural disasters are expected to increase due to climatic changes that strongly affect environmental, social and economical systems. For this reason and because of the limited resources, governments require analytical risk analysis for a better mitigation planning. Risk analysis is a process to determine the nature and extent of risk by estimating potential hazards and evaluating existing conditions of vulnerability that could pose a potential threat or harm to people, property, livelihoods and environment. This process has become a generally accepted approach for the assessment of cost-benefit scenarios; originating from technical risks it is being applied to natural hazards for several years now in Switzerland. Starting from these premises "Risk Lab", a joint collaboration between the Institute of Earth Sciences of the University of Applied Sciences of Southern Switzerland and the Institute for Economic Research of the University of Lugano, has been started in 2006, aiming to become a competence centre about Risk Analysis and Evaluation. The main issue studied by the lab concerns the topic "What security at what price?" and the activities follow the philosophy of the integral risk management as proposed by PLANAT, that defines the process as a cycle that contains different and interrelated phases. The final aim is to change the population and technician idea about risk from "defending against danger" to "being aware of risks" through a proper academic course specially addressed to young people. In fact the most important activity of the laboratory consists in a degree course, offered both to Engineering and Architecture students of the University of Applied Sciences of Southern Switzerland and Economy Students of the University of Lugano. The course is structured in two main parts: an introductive, theoretical part, composed by class lessons, where the main aspects of natural hazards, risk perception and evaluation and risk management are presented

  2. The application of risk management in sport.

    PubMed

    Fuller, Colin; Drawer, Scott

    2004-01-01

    The process of risk management can be implemented as part of a best practice management system within the sport and leisure sector. The process enables risk factors that might lead to injuries to be identified and the levels of risk associated with activities to be estimated and evaluated. This information can be utilised proactively by sports governing bodies and participants to identify preventive and therapeutic interventions in order to reduce the frequency of occurrence and/or severity of injuries within their sports. The acceptability of risk within specific sports, however, is dependent on the perceptions of the participants involved. Copyright 2004 Adis Data Information BV

  3. Expert Views on Regulatory Preparedness for Managing the Risks of Nanotechnologies

    PubMed Central

    Beaudrie, Christian E. H.; Satterfield, Terre; Kandlikar, Milind; Harthorn, Barbara H.

    2013-01-01

    The potential and promise of nanotechnologies depends in large part on the ability for regulatory systems to assess and manage their benefits and risks. However, considerable uncertainty persists regarding the health and environmental implications of nanomaterials, hence the capacity for existing regulations to meet this challenge has been widely questioned. Here we draw from a survey (N=254) of US-based nano-scientists and engineers, environmental health and safety scientists, and regulatory scientists and decision-makers, to ask whether nano experts regard regulatory agencies as prepared for managing nanomaterial risks. We find that all three expert groups view regulatory agencies as unprepared. The effect is strongest for regulators themselves, and less so for scientists conducting basic, applied, or health and safety work on nanomaterials. Those who see nanotechnology risks as novel, uncertain, and difficult to assess are particularly likely to see agencies as unprepared. Trust in regulatory agencies, views of stakeholder responsibility regarding the management of risks, and socio-political values were also found to be small but significant drivers of perceived agency preparedness. These results underscore the need for new tools and methods to enable the assessment of nanomaterial risks, and to renew confidence in regulatory agencies’ ability to oversee their growing use and application in society. PMID:24244662

  4. Navigator program risk management

    NASA Technical Reports Server (NTRS)

    Wessen, Randii R.; Padilla, Deborah A.

    2004-01-01

    In this paper, program risk management as applied to the Navigator Program: In Search of New Worlds will be discussed. The Navigator Program's goals are to learn how planetary systems form and to search for those worlds that could or do harbor life.

  5. Arctic Risk Management (ARMNet) Network: Linking Risk Management Practitioners and Researchers Across the Arctic Regions of Canada and Alaska To Improve Risk, Emergency and Disaster Preparedness and Mitigation Through Comparative Analysis and Applied Research

    NASA Astrophysics Data System (ADS)

    Garland, A.

    2015-12-01

    The Arctic Risk Management Network (ARMNet) was conceived as a trans-disciplinary hub to encourage and facilitate greater cooperation, communication and exchange among American and Canadian academics and practitioners actively engaged in the research, management and mitigation of risks, emergencies and disasters in the Arctic regions. Its aim is to assist regional decision-makers through the sharing of applied research and best practices and to support greater inter-operability and bilateral collaboration through improved networking, joint exercises, workshops, teleconferences, radio programs, and virtual communications (eg. webinars). Most importantly, ARMNet is a clearinghouse for all information related to the management of the frequent hazards of Arctic climate and geography in North America, including new and emerging challenges arising from climate change, increased maritime polar traffic and expanding economic development in the region. ARMNet is an outcome of the Arctic Observing Network (AON) for Long Term Observations, Governance, and Management Discussions, www.arcus.org/search-program. The AON goals continue with CRIOS (www.ariesnonprofit.com/ARIESprojects.php) and coastal erosion research (www.ariesnonprofit.com/webinarCoastalErosion.php) led by the North Slope Borough Risk Management Office with assistance from ARIES (Applied Research in Environmental Sciences Nonprofit, Inc.). The constituency for ARMNet will include all northern academics and researchers, Arctic-based corporations, First Responders (FRs), Emergency Management Offices (EMOs) and Risk Management Offices (RMOs), military, Coast Guard, northern police forces, Search and Rescue (SAR) associations, boroughs, territories and communities throughout the Arctic. This presentation will be of interest to all those engaged in Arctic affairs, describe the genesis of ARMNet and present the results of stakeholder meetings and webinars designed to guide the next stages of the Project.

  6. The role local initiatives in community based disaster risk management in Kemijen, Semarang City

    NASA Astrophysics Data System (ADS)

    Fauzie, W. Z.; Sariffudin, S.

    2017-06-01

    Community-based disaster risk reduction is one of the homegrown initiatives efforts and community empowerment oriented in disaster management. This approach is very important because no one can understand the conditions in a region better than the local communities. Therefore, the implementation of CBDRM always emphasize local initiatives in decision making. The existence of local initiative is necessary specially to anticipate the impact of climate change which is increasingly affecting towns in coastal areas, including settlements in Semarang. Kemijen Urban Village is one of the informal settlements in Semarang, which has the highest intensity of flood that is 12 times during 5 years (2011-2015). The research question is how the level of local initiatives in flood disaster management in Kemijen, Semarang? This study aims to assess the level of local initiatives in Kemijen as the community adaptive capacity of flood prevention in pre-disaster, emergency response, and post-disaster. Local initiatives assessed on water supply, sanitation, food, shelter, health, drainage maintenance and waste management. This study shows the level of local initiatives in pre-disaster and post-disaster is almost same and bigger than the response phase. Scoring results showed that pre-disaster is 35.002, 27.9577 for emergency response, and post-disaster is 34.9862 with each category that is independent, empowered, and independent. This study also shows that local initiatives in Kemijen largely formed by individual initiative and only a few were formed by a collective initiative.

  7. The effect of rights-based fisheries management on risk taking and fishing safety

    PubMed Central

    Pfeiffer, Lisa; Gratz, Trevor

    2016-01-01

    Commercial fishing is a dangerous occupation despite decades of regulatory initiatives aimed at making it safer. We posit that rights-based fisheries management (the individual allocation of fishing quota to vessels or fishing entities, also called catch shares) can improve safety by solving many of the problems associated with the competitive race to fish experienced in fisheries around the world. The competitive nature of such fisheries results in risky behavior such as fishing in poor weather, overloading vessels with fishing gear, and neglecting maintenance. Although not necessarily intended to address safety issues, catch shares eliminate many of the economic incentives to fish as rapidly as possible. We develop a dataset and methods to empirically evaluate the effects of the adoption of catch shares management on a particularly risky type of behavior: the propensity to fish in stormy weather. After catch shares was implemented in an economically important US West Coast fishery, a fisherman’s probability of taking a fishing trip in high wind conditions decreased by 82% compared with only 31% in the former race to fish fishery. Overall, catch shares caused the average annual rate of fishing on high wind days to decrease by 79%. These results are evidence that institutional changes can significantly reduce individual, voluntary risk exposure and result in safer fisheries. PMID:26884188

  8. Bow-tie diagrams for risk management in anaesthesia.

    PubMed

    Culwick, M D; Merry, A F; Clarke, D M; Taraporewalla, K J; Gibbs, N M

    2016-11-01

    Bow-tie analysis is a risk analysis and management tool that has been readily adopted into routine practice in many high reliability industries such as engineering, aviation and emergency services. However, it has received little exposure so far in healthcare. Nevertheless, its simplicity, versatility, and pictorial display may have benefits for the analysis of a range of healthcare risks, including complex and multiple risks and their interactions. Bow-tie diagrams are a combination of a fault tree and an event tree, which when combined take the shape of a bow tie. Central to bow-tie methodology is the concept of an undesired or 'Top Event', which occurs if a hazard progresses past all prevention controls. Top Events may also occasionally occur idiosyncratically. Irrespective of the cause of a Top Event, mitigation and recovery controls may influence the outcome. Hence the relationship of hazard to outcome can be viewed in one diagram along with possible causal sequences or accident trajectories. Potential uses for bow-tie diagrams in anaesthesia risk management include improved understanding of anaesthesia hazards and risks, pre-emptive identification of absent or inadequate hazard controls, investigation of clinical incidents, teaching anaesthesia risk management, and demonstrating risk management strategies to third parties when required.

  9. Developing a risk-based trading scheme for cattle in England: farmer perspectives on managing trading risk for bovine tuberculosis.

    PubMed

    Little, R; Wheeler, K; Edge, S

    2017-02-11

    This paper examines farmer attitudes towards the development of a voluntary risk-based trading scheme for cattle in England as a risk mitigation measure for bovine tuberculosis (bTB). The research reported here was commissioned to gather evidence on the type of scheme that would have a good chance of success in improving the information farmers receive about the bTB risk of cattle they buy. Telephone interviews were conducted with a stratified random sample of 203 cattle farmers in England, splitting the interviews equally between respondents in the high-risk area and low-risk area for bTB. Supplementary interviews and focus groups with farmers were also carried out across the risk areas. Results suggest a greater enthusiasm for a risk-based trading scheme in low-risk areas compared with high-risk areas and among members of breed societies and cattle health schemes. Third-party certification of herds by private vets or the Animal and Plant Health Agency were regarded as the most credible source, with farmer self-certification being favoured by sellers, but being regarded as least credible by buyers. Understanding farmers' attitudes towards voluntary risk-based trading is important to gauge likely uptake, understand preferences for information provision and to assist in monitoring, evaluating and refining the scheme once established. British Veterinary Association.

  10. 76 FR 3697 - Risk Management Requirements for Derivatives Clearing Organizations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    .... Risk Management Requirements Core Principle D, as amended by the Dodd-Frank Act,\\27\\ requires each DCO... Part II Commodity Futures Trading Commission 17 CFR Part 39 Risk Management Requirements for... RIN 3038-AC98 Risk Management Requirements for Derivatives Clearing Organizations AGENCY: Commodity...

  11. Extractive waste management: A risk analysis approach.

    PubMed

    Mehta, Neha; Dino, Giovanna Antonella; Ajmone-Marsan, Franco; Lasagna, Manuela; Romè, Chiara; De Luca, Domenico Antonio

    2018-05-01

    Abandoned mine sites continue to present serious environmental hazards because the heavy metals associated with extractive waste are continuously released into the environment, where they threaten human life and the environment. Remediating and securing extractive waste are complex, lengthy and costly processes. Thus, in most European countries, a site is considered for intervention when it poses a risk to human health and the surrounding environment. As a consequence, risk analysis presents a viable decisional approach towards the management of extractive waste. To evaluate the effects posed by extractive waste to human health and groundwater, a risk analysis approach was used for an abandoned nickel extraction site in Campello Monti in North Italy. This site is located in the Southern Italian Alps. The area consists of large and voluminous mafic rocks intruded by mantle peridotite. The mining activities in this area have generated extractive waste. A risk analysis of the site was performed using Risk Based Corrective Action (RBCA) guidelines, considering the properties of extractive waste and water for the properties of environmental matrices. The results showed the presence of carcinogenic risk due to arsenic and risks to groundwater due to nickel. The results of the risk analysis form a basic understanding of the current situation at the site, which is affected by extractive waste. Copyright © 2017 Elsevier B.V. All rights reserved.

  12. Development of funding project risk management tools.

    DOT National Transportation Integrated Search

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  13. Assessing and Managing Risk with Suicidal Individuals

    ERIC Educational Resources Information Center

    Linehan, Marsh M.; Comtois, Katherine A.; Ward-Ciesielski, Erin F.

    2012-01-01

    The University of Washington Risk Assessment Protocol (UWRAP) and Risk Assessment and Management Protocol (UWRAMP) have been used in numerous clinical trials treating high-risk suicidal individuals over several years. These protocols structure assessors and treatment providers to provide a thorough suicide risk assessment, review standards of care…

  14. Computational methods in the pricing and risk management of modern financial derivatives

    NASA Astrophysics Data System (ADS)

    Deutsch, Hans-Peter

    1999-09-01

    In the last 20 years modern finance has developed into a complex mathematically challenging field. Very complicated risks exist in financial markets which need very advanced methods to measure and/or model them. The financial instruments invented by the market participants to trade these risk, the so called derivatives are usually even more complicated than the risks themselves and also sometimes generate new riks. Topics like random walks, stochastic differential equations, martingale measures, time series analysis, implied correlations, etc. are of common use in the field. This is why more and more people with a science background, such as physicists, mathematicians, or computer scientists, are entering the field of finance. The measurement and management of all theses risks is the key to the continuing success of banks. This talk gives insight into today's common methods of modern market risk management such as variance-covariance, historical simulation, Monte Carlo, “Greek” ratios, etc., including the statistical concepts on which they are based. Derivatives are at the same time the main reason for and the most effective means of conducting risk management. As such, they stand at the beginning and end of risk management. The valuation of derivatives and structured financial instruments is therefore the prerequisite, the condition sine qua non, for all risk management. This talk introduces some of the important valuation methods used in modern derivatives pricing such as present value, Black-Scholes, binomial trees, Monte Carlo, etc. In summary this talk highlights an area outside physics where there is a lot of interesting work to do, especially for physicists. Or as one of our consultants said: The fascinating thing about this job is that Arthur Andersen hired me not ALTHOUGH I am a physicist but BECAUSE I am a physicist.

  15. Early decision framework for integrating sustainable risk management for complex remediation sites: Drivers, barriers, and performance metrics.

    PubMed

    Harclerode, Melissa A; Macbeth, Tamzen W; Miller, Michael E; Gurr, Christopher J; Myers, Teri S

    2016-12-15

    As the environmental remediation industry matures, remaining sites often have significant underlying technical challenges and financial constraints. More often than not, significant remediation efforts at these "complex" sites have not achieved stringent, promulgated cleanup goals. Decisions then have to be made about whether and how to commit additional resources towards achieving those goals, which are often not achievable nor required to protect receptors. Guidance on cleanup approaches focused on evaluating and managing site-specific conditions and risks, rather than uniformly meeting contaminant cleanup criteria in all media, is available to aid in this decision. Although these risk-based cleanup approaches, such as alternative endpoints and adaptive management strategies, have been developed, they are under-utilized due to environmental, socio-economic, and risk perception barriers. Also, these approaches are usually implemented late in the project life cycle after unsuccessful remedial attempts to achieve stringent cleanup criteria. In this article, we address these barriers by developing an early decision framework to identify if site characteristics support sustainable risk management, and develop performance metrics and tools to evaluate and implement successful risk-based cleanup approaches. In addition, we address uncertainty and risk perception challenges by aligning risk-based cleanup approaches with the concepts of risk management and sustainable remediation. This approach was developed in the context of lessons learned from implementing remediation at complex sites, but as a framework can, and should, be applied to all sites undergoing remediation. Copyright © 2016 Elsevier Ltd. All rights reserved.

  16. 77 FR 21067 - Funding Opportunity Title: Risk Management Education and Outreach Partnerships Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-09

    ... access and participation of underserved communities, and providing risk management education and..., community based organizations or a coalition of community-based organization that has demonstrated... applicant's employees or the community. The applicant must demonstrate that performance under the...

  17. Using Computational Approaches to Improve Risk-Stratified Patient Management: Rationale and Methods

    PubMed Central

    Stone, Bryan L; Sakaguchi, Farrant; Sheng, Xiaoming; Murtaugh, Maureen A

    2015-01-01

    Background Chronic diseases affect 52% of Americans and consume 86% of health care costs. A small portion of patients consume most health care resources and costs. More intensive patient management strategies, such as case management, are usually more effective at improving health outcomes, but are also more expensive. To use limited resources efficiently, risk stratification is commonly used in managing patients with chronic diseases, such as asthma, chronic obstructive pulmonary disease, diabetes, and heart disease. Patients are stratified based on predicted risk with patients at higher risk given more intensive care. The current risk-stratified patient management approach has 3 limitations resulting in many patients not receiving the most appropriate care, unnecessarily increased costs, and suboptimal health outcomes. First, using predictive models for health outcomes and costs is currently the best method for forecasting individual patient’s risk. Yet, accuracy of predictive models remains poor causing many patients to be misstratified. If an existing model were used to identify candidate patients for case management, enrollment would miss more than half of those who would benefit most, but include others unlikely to benefit, wasting limited resources. Existing models have been developed under the assumption that patient characteristics primarily influence outcomes and costs, leaving physician characteristics out of the models. In reality, both characteristics have an impact. Second, existing models usually give neither an explanation why a particular patient is predicted to be at high risk nor suggestions on interventions tailored to the patient’s specific case. As a result, many high-risk patients miss some suitable interventions. Third, thresholds for risk strata are suboptimal and determined heuristically with no quality guarantee. Objective The purpose of this study is to improve risk-stratified patient management so that more patients will receive the

  18. Imaging X-Ray Polarimetry Explorer (IXPE) Risk Management

    NASA Technical Reports Server (NTRS)

    Alexander, Cheryl; Deininger, William D.; Baggett, Randy; Primo, Attina; Bowen, Mike; Cowart, Chris; Del Monte, Ettore; Ingram, Lindsey; Kalinowski, William; Kelley, Anthony; hide

    2018-01-01

    The Imaging X-ray Polarimetry Explorer (IXPE) project is an international collaboration to build and fly a polarization sensitive X-ray observatory. The IXPE Observatory consists of the spacecraft and payload. The payload is composed of three X-ray telescopes, each consisting of a mirror module optical assembly and a polarization-sensitive X-ray detector assembly; a deployable boom maintains the focal length between the optical assemblies and the detectors. The goal of the IXPE Mission is to provide new information about the origins of cosmic X-rays and their interactions with matter and gravity as they travel through space. IXPE will do this by exploiting its unique capability to measure the polarization of X-rays emitted by cosmic sources. The collaboration for IXPE involves national and international partners during design, fabrication, assembly, integration, test, and operations. The full collaboration includes NASA Marshall Space Flight Center (MSFC), Ball Aerospace, the Italian Space Agency (ASI), the Italian Institute of Astrophysics and Space Planetology (IAPS)/Italian National Institute of Astrophysics (INAF), the Italian National Institute for Nuclear Physics (INFN), the University of Colorado (CU) Laboratory for Atmospheric and Space Physics (LASP), Stanford University, McGill University, and the Massachusetts Institute of Technology. The goal of this paper is to discuss risk management as it applies to the IXPE project. The full IXPE Team participates in risk management providing both unique challenges and advantages for project risk management. Risk management is being employed in all phases of the IXPE Project, but is particularly important during planning and initial execution-the current phase of the IXPE Project. The discussion will address IXPE risk strategies and responsibilities, along with the IXPE management process which includes risk identification, risk assessment, risk response, and risk monitoring, control, and reporting.

  19. 12 CFR 652.15 - Interest rate risk management and requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 6 2011-01-01 2011-01-01 false Interest rate risk management and requirements... AGRICULTURAL MORTGAGE CORPORATION FUNDING AND FISCAL AFFAIRS Investment Management § 652.15 Interest rate risk... (direction, controls, and supervision) to the interest rate risk management program and must be knowledgeable...

  20. 12 CFR 652.15 - Interest rate risk management and requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Interest rate risk management and requirements... AGRICULTURAL MORTGAGE CORPORATION FUNDING AND FISCAL AFFAIRS Investment Management § 652.15 Interest rate risk... (direction, controls, and supervision) to the interest rate risk management program and must be knowledgeable...

  1. Six Sigma Quality Management System and Design of Risk-based Statistical Quality Control.

    PubMed

    Westgard, James O; Westgard, Sten A

    2017-03-01

    Six sigma concepts provide a quality management system (QMS) with many useful tools for managing quality in medical laboratories. This Six Sigma QMS is driven by the quality required for the intended use of a test. The most useful form for this quality requirement is the allowable total error. Calculation of a sigma-metric provides the best predictor of risk for an analytical examination process, as well as a design parameter for selecting the statistical quality control (SQC) procedure necessary to detect medically important errors. Simple point estimates of sigma at medical decision concentrations are sufficient for laboratory applications. Copyright © 2016 Elsevier Inc. All rights reserved.

  2. The Troll HSE Risk Management System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiig, E.; Berthelsen, I.; Donovan, K.

    1996-12-31

    The Petroleum Act and Internal Control regulations in Norway lay down requirements for how HSE shall be Managed and documented. To comply with the Norwegian legislation the Troll Project has developed an HSE Risk Management System (RMS) structured around Hazards and Effects Management. The resulting quality, technical and operating integrity, and HSE performance are an endorsement of the power of RMS.

  3. Training Manual for Human Service Risk Managers. Final Report.

    ERIC Educational Resources Information Center

    Davis, Frank W.; And Others

    This manual is designed to educate human service agency management personnel involved in transportation about basic risk management principles and insurance issues. Chapter I illustrates the liability factors that create the insurance and risk management needs. Both legal and humanitarian obligations of human service agencies involved in…

  4. Can Systematic Reviews Inform GMO Risk Assessment and Risk Management?

    PubMed

    Kohl, Christian; Frampton, Geoff; Sweet, Jeremy; Spök, Armin; Haddaway, Neal Robert; Wilhelm, Ralf; Unger, Stefan; Schiemann, Joachim

    2015-01-01

    Systematic reviews represent powerful tools to identify, collect, synthesize, and evaluate primary research data on specific research questions in a highly standardized and reproducible manner. They enable the defensible synthesis of outcomes by increasing precision and minimizing bias whilst ensuring transparency of the methods used. This makes them especially valuable to inform evidence-based risk analysis and decision making in various topics and research disciplines. Although seen as a "gold standard" for synthesizing primary research data, systematic reviews are not without limitations as they are often cost, labor and time intensive and the utility of synthesis outcomes depends upon the availability of sufficient and robust primary research data. In this paper, we (1) consider the added value systematic reviews could provide when synthesizing primary research data on genetically modified organisms (GMO) and (2) critically assess the adequacy and feasibility of systematic review for collating and analyzing data on potential impacts of GMOs in order to better inform specific steps within GMO risk assessment and risk management. The regulatory framework of the EU is used as an example, although the issues we discuss are likely to be more widely applicable.

  5. Can Systematic Reviews Inform GMO Risk Assessment and Risk Management?

    PubMed Central

    Kohl, Christian; Frampton, Geoff; Sweet, Jeremy; Spök, Armin; Haddaway, Neal Robert; Wilhelm, Ralf; Unger, Stefan; Schiemann, Joachim

    2015-01-01

    Systematic reviews represent powerful tools to identify, collect, synthesize, and evaluate primary research data on specific research questions in a highly standardized and reproducible manner. They enable the defensible synthesis of outcomes by increasing precision and minimizing bias whilst ensuring transparency of the methods used. This makes them especially valuable to inform evidence-based risk analysis and decision making in various topics and research disciplines. Although seen as a “gold standard” for synthesizing primary research data, systematic reviews are not without limitations as they are often cost, labor and time intensive and the utility of synthesis outcomes depends upon the availability of sufficient and robust primary research data. In this paper, we (1) consider the added value systematic reviews could provide when synthesizing primary research data on genetically modified organisms (GMO) and (2) critically assess the adequacy and feasibility of systematic review for collating and analyzing data on potential impacts of GMOs in order to better inform specific steps within GMO risk assessment and risk management. The regulatory framework of the EU is used as an example, although the issues we discuss are likely to be more widely applicable. PMID:26322307

  6. The role of Indigenous knowledge in environmental health risk management in Yukon, Canada

    PubMed Central

    Friendship, Katelyn A.; Furgal, Chris M.

    2012-01-01

    Objectives This project aimed to gain better understandings of northern Indigenous risk perception related to food safety and to identify the role that Indigenous knowledge (IK) plays in risk management processes to support more effective and culturally relevant benefit-risk (B-R) management strategies. Study design The project used an exploratory qualitative case study design to investigate the role and place of IK in the management of environmental contaminants exposure via consumption of traditional foods in Yukon First Nations (YFNs). Methods Forty-one semi-directive interviews with Traditional Food Knowledge Holders and Health and Environment Decision-makers were conducted. A review and analysis of organizational documents related to past risk management events for the issue was conducted. Thematic content analysis was used to analyze transcripts and documents for key themes related to the research question. Results There was a recognized need by all participants for better collaboration between scientists and YFN communities. YFNs have been involved in identifying and defining community concerns about past risk issues, setting a local context, and participating in communications strategies. Interviewees stressed the need to commit adequate time for building relationships, physically being in the community, and facilitating open communication. Conducting community-based projects was identified as critical for collaboration and for cooperative learning and management of these issues. Conclusions The perception of “effective” benefit-risk management is significantly influenced by the efforts made to include local communities in the process. A set of common guiding principles within a process that brings together people and knowledge systems may provide a more effective way forward in cross-cultural, multiple knowledge system contexts for complex benefit-risk issues than a prescriptive rigid framework. PMID:22868192

  7. A Systems Modeling Approach for Risk Management of Command File Errors

    NASA Technical Reports Server (NTRS)

    Meshkat, Leila

    2012-01-01

    The main cause of commanding errors is often (but not always) due to procedures. Either lack of maturity in the processes, incompleteness of requirements or lack of compliance to these procedures. Other causes of commanding errors include lack of understanding of system states, inadequate communication, and making hasty changes in standard procedures in response to an unexpected event. In general, it's important to look at the big picture prior to making corrective actions. In the case of errors traced back to procedures, considering the reliability of the process as a metric during its' design may help to reduce risk. This metric is obtained by using data from Nuclear Industry regarding human reliability. A structured method for the collection of anomaly data will help the operator think systematically about the anomaly and facilitate risk management. Formal models can be used for risk based design and risk management. A generic set of models can be customized for a broad range of missions.

  8. Risk, Issues and Lessons Learned: Maximizing Risk Management in the DoD Ground Domain

    DTIC Science & Technology

    2011-10-01

    Carnegie Mellon University “Risk Management Overview for TACOM” Benefits of Risk Management include: • Risk is a proactive approach - preventing... Chili (no beans) 13 • Hot dog sub-assy Unclassified How does the FMEA work? Execute the analysis and discover the potential failures and effects...34 - --· . -· A c u i.rition Benefits of FMEAs • Prevent major risks, reduce failures, minimize cost and reduce development time - Do it right the first time

  9. Health-Based Capitation Risk Adjustment in Minnesota Public Health Care Programs

    PubMed Central

    Gifford, Gregory A.; Edwards, Kevan R.; Knutson, David J.

    2004-01-01

    This article documents the history and implementation of health-based capitation risk adjustment in Minnesota public health care programs, and identifies key implementation issues. Capitation payments in these programs are risk adjusted using an historical, health plan risk score, based on concurrent risk assessment. Phased implementation of capitation risk adjustment for these programs began January 1, 2000. Minnesota's experience with capitation risk adjustment suggests that: (1) implementation can accelerate encounter data submission, (2) administrative decisions made during implementation can create issues that impact payment model performance, and (3) changes in diagnosis data management during implementation may require changes to the payment model. PMID:25372356

  10. Major Management Challenges and Program Risks. Department of State

    DTIC Science & Technology

    2001-01-01

    Major Management Challenges and Program Risks Department of StateGAO-01-252 Form SF298 Citation Data Report Date ("DD MON YYYY") 00JAN2001 Report...Type N/A Dates Covered (from... to) ("DD MON YYYY") Title and Subtitle Major Management Challenges and Program Risks Department of State Contract or...special series, first issued in January 1999, entitled the Performance and Accountability Series: Major Management Challenges and Program Risks . In

  11. RISK MANAGEMENT RESEARCH PLAN FOR WET WEATHER FLOWS

    EPA Science Inventory

    This plan was prepared by the National Risk Management Research Laboratory (NRMRL) of EPA's Office of Research and Development (ORD) to guide the risk management aspects of the urban wet weather flow (WWF) research for the next five years. There are three types of urban WWF dis...

  12. Managing Corporate Risk through Better Knowledge Management

    ERIC Educational Resources Information Center

    Neef, Dale

    2005-01-01

    Purpose: To explain how progressive companies are using a combination of knowledge and risk management (KRM) systems and techniques in order to help them to prevent, or respond most effectively to, ethical or reputation-damaging incidents. Design/methodology/approach: The paper explains KRM, develops a corporate integrity framework, and then…

  13. 12 CFR 615.5181 - Bank interest rate risk management program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 6 2011-01-01 2011-01-01 false Bank interest rate risk management program. 615... FISCAL AFFAIRS, LOAN POLICIES AND OPERATIONS, AND FUNDING OPERATIONS Risk Assessment and Management § 615.5181 Bank interest rate risk management program. (a) The board of directors of each Farm Credit Bank...

  14. 12 CFR 615.5180 - Bank interest rate risk management program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 Banks and Banking 7 2014-01-01 2014-01-01 false Bank interest rate risk management program. 615... FISCAL AFFAIRS, LOAN POLICIES AND OPERATIONS, AND FUNDING OPERATIONS Risk Assessment and Management § 615.5180 Bank interest rate risk management program. (a) The board of directors of each Farm Credit bank...

  15. 12 CFR 615.5181 - Bank interest rate risk management program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Bank interest rate risk management program. 615... FISCAL AFFAIRS, LOAN POLICIES AND OPERATIONS, AND FUNDING OPERATIONS Risk Assessment and Management § 615.5181 Bank interest rate risk management program. (a) The board of directors of each Farm Credit Bank...

  16. Cardiovascular risk management in rheumatoid arthritis patients still suboptimal: the Implementation of Cardiovascular Risk Management in Rheumatoid Arthritis project.

    PubMed

    van den Oever, Inge A M; Heslinga, Maaike; Griep, Ed N; Griep-Wentink, Hanneke R M; Schotsman, Rob; Cambach, Walter; Dijkmans, Ben A C; Smulders, Yvo M; Lems, Willem F; Boers, Maarten; Voskuyl, Alexandre E; Peters, Mike J L; van Schaardenburg, Dirkjan; Nurmohamed, Micheal T

    2017-09-01

    To assess the 10-year cardiovascular (CV) risk score and to identify treatment and undertreatment of CV risk factors in patients with established RA. Demographics, CV risk factors and prevalence of cardiovascular disease (CVD) were assessed by questionnaire. To calculate the 10-year CV risk score according to the Dutch CV risk management guideline, systolic blood pressure was measured and cholesterol levels were determined from fasting blood samples. Patients were categorized into four groups: indication for treatment but not treated; inadequately treated, so not meeting goals (systolic blood pressure ⩽140 mmHg and/or low-density lipoprotein ⩽2.5 mmol/l); adequately treated; or no treatment necessary. A total of 720 consecutive RA patients were included, 375 from Reade and 345 from the Antonius Hospital. The mean age of patients was 59 years (s.d. 12) and 73% were female. Seventeen per cent of the patients had a low 10-year CV risk (<10%), 21% had an intermediate risk (10-19%), 53% a high risk (⩾20%) and 9% had CVD. In total, 69% had an indication for preventive treatment (cholesterol-lowering or antihypertensive drugs). Of those, 42% received inadequate treatment and 40% received no treatment at all. Optimal CV risk management remains a major challenge and better awareness and management are urgently needed to reduce the high risk of CVD in the RA population. © The Author 2017. Published by Oxford University Press on behalf of the British Society for Rheumatology. All rights reserved. For Permissions, please email: journals.permissions@oup.com

  17. Use of documentary sources on past flood events for flood risk management and land planning

    NASA Astrophysics Data System (ADS)

    Cœur, Denis; Lang, Michel

    2008-09-01

    The knowledge of past catastrophic events can improve flood risk mitigation policy, with a better awareness against risk. As such historical information is usually available in Europe for the past five centuries, historians are able to understand how past society dealt with flood risk, and hydrologists can include information on past floods into an adapted probabilistic framework. In France, Flood Risk Mitigation Maps are based either on the largest historical known flood event or on the 100-year flood event if it is greater. Two actions can be suggested in terms of promoting the use of historical information for flood risk management: (1) the development of a regional flood data base, with both historical and current data, in order to get a good feedback on recent events and to improve the flood risk education and awareness; (2) the commitment to keep a persistent/perennial management of a reference network of hydrometeorological observations for climate change studies.

  18. Systems engineering approach to environmental risk management: A case study of depleted uranium at test area C-64, Eglin Air Force Base, Florida. Master`s thesis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carter, C.M.; Fortmann, K.M.; Hill, S.W.

    1994-12-01

    Environmental restoration is an area of concern in an environmentally conscious world. Much effort is required to clean up the environment and promote environmentally sound methods for managing current land use. In light of the public consciousness with the latter topic, the United States Air Force must also take an active role in addressing these environmental issues with respect to current and future USAF base land use. This thesis uses the systems engineering technique to assess human health risks and to evaluate risk management options with respect to depleted uranium contamination in the sampled region of Test Area (TA) C-64more » at Eglin Air Force Base (AFB). The research combines the disciplines of environmental data collection, DU soil concentration distribution modeling, ground water modeling, particle resuspension modeling, exposure assessment, health hazard assessment, and uncertainty analysis to characterize the test area. These disciplines are required to quantify current and future health risks, as well as to recommend cost effective ways to increase confidence in health risk assessment and remediation options.« less

  19. Territory management an appropriate approach for taking into account dynamic risks

    NASA Astrophysics Data System (ADS)

    Fernandez, M.; Ruegg, J.

    2012-04-01

    The territorial approach in risk analysis is well established in scientific communications in recent years, especially in the francophone literature. It is an especially appropriate approach for exploring a large number of criteria and factors influencing, on the territory, the composition of the vulnerabilities and risks. In these sense, this approach is appropriate to identify not only risks due to natural hazards but also social and environmental risks. Our case study explores the catastrophic landslide, a collapse of 6 millions cubic meters of rock in Los Chorros, in the municipality of San Cristobal Verapaz-Guatemala, in January 2009. We demonstrate that the same natural hazard has different consequences within this territory and may also increase or even create new vulnerabilities and risks for the population. The analysis shows that the same event can endanger various aspects of the territory: resources, functions (agriculture, or houses uses for example) and allocations and highlights the different types of vulnerabilities that land users (i.e., farmers, merchants transport drivers) face. To resolve a post-disaster situation, the actors choose one vulnerability among a set of vulnerabilities (in a multi-vulnerability context) and with this choice they define their own acceptable risk limits. To give an example, the transport driver choose to reduce the economic vulnerability when going to the local market and crossing the landslide (physical vulnerability). In the context of a developing country with weak development and limited resources, land users that become the Risk managers after the disaster are compelled to prioritize between different actions for reducing risks This study provides a novel approach to risk management by adding a political science and geography dimension through the territory approach for improving our understanding of multi-hazard and multi-risk management. Based on findings from this case study, this work asserts that risk is not

  20. RISK AND RISK ASSESSMENT IN WATER-BASED RECREATION

    EPA Science Inventory

    The great number of individuals using recreational water resources presents a challenge with regard to protecting the health of these recreationists. Risk assessment provides a framework for characterizing the risk associated with exposure to microbial hazards and for managing r...

  1. Risk assessment and risk management of mycotoxins.

    PubMed

    2012-01-01

    Risk assessment is the process of quantifying the magnitude and exposure, or probability, of a harmful effect to individuals or populations from certain agents or activities. Here, we summarize the four steps of risk assessment: hazard identification, dose-response assessment, exposure assessment, and risk characterization. Risk assessments using these principles have been conducted on the major mycotoxins (aflatoxins, fumonisins, ochratoxin A, deoxynivalenol, and zearalenone) by various regulatory agencies for the purpose of setting food safety guidelines. We critically evaluate the impact of these risk assessment parameters on the estimated global burden of the associated diseases as well as the impact of regulatory measures on food supply and international trade. Apart from the well-established risk posed by aflatoxins, many uncertainties still exist about risk assessments for the other major mycotoxins, often reflecting a lack of epidemiological data. Differences exist in the risk management strategies and in the ways different governments impose regulations and technologies to reduce levels of mycotoxins in the food-chain. Regulatory measures have very little impact on remote rural and subsistence farming communities in developing countries, in contrast to developed countries, where regulations are strictly enforced to reduce and/or remove mycotoxin contamination. However, in the absence of the relevant technologies or the necessary infrastructure, we highlight simple intervention practices to reduce mycotoxin contamination in the field and/or prevent mycotoxin formation during storage.

  2. Recent Development in Big Data Analytics for Business Operations and Risk Management.

    PubMed

    Choi, Tsan-Ming; Chan, Hing Kai; Yue, Xiaohang

    2017-01-01

    "Big data" is an emerging topic and has attracted the attention of many researchers and practitioners in industrial systems engineering and cybernetics. Big data analytics would definitely lead to valuable knowledge for many organizations. Business operations and risk management can be a beneficiary as there are many data collection channels in the related industrial systems (e.g., wireless sensor networks, Internet-based systems, etc.). Big data research, however, is still in its infancy. Its focus is rather unclear and related studies are not well amalgamated. This paper aims to present the challenges and opportunities of big data analytics in this unique application domain. Technological development and advances for industrial-based business systems, reliability and security of industrial systems, and their operational risk management are examined. Important areas for future research are also discussed and revealed.

  3. A review of risk management process in construction projects of developing countries

    NASA Astrophysics Data System (ADS)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  4. New Tools and Methods for Assessing Risk-Management Strategies

    DTIC Science & Technology

    2004-03-01

    Theories to evaluate the risks and benefits of various acquisition alternatives and allowed researchers to monitor the process students used to make a...revealed distinct risk-management strategies. 15. SUBJECT TERMS risk managements, acquisition process, expected value theory , multi-attribute utility theory ...Utility Theories to evaluate the risks and benefits of various acquisition alternatives, and allowed us to monitor the process subjects used to arrive at

  5. Using risk analysis to reveal opportunities for the management of unplanned ignitions in wilderness

    Treesearch

    Kevin Barnett; Carol Miller; Tyron J. Venn

    2016-01-01

    A goal of fire management in wilderness is to allow fire to play its natural ecological role without intervention. Unfortunately, most unplanned ignitions in wilderness are suppressed, in part because of the risk they might pose to values outside of the wilderness. We capitalize on recent advances in fire risk analysis to demonstrate a risk-based approach for revealing...

  6. The case for risk-based premiums in public health insurance.

    PubMed

    Zweifel, Peter; Breuer, Michael

    2006-04-01

    Uniform, risk-independent insurance premiums are accepted as part of 'managed competition' in health care. However, they are not compatible with optimality of health insurance contracts in the presence of both ex ante and ex post moral hazard. They have adverse effects on insurer behaviour even if risk adjustment is taken into account. Risk-based premiums combined with means-tested, tax-financed transfers are advocated as an alternative.

  7. Managing Risk for Cassini During Mission Operations and Data Analysis (MOandDA)

    NASA Technical Reports Server (NTRS)

    Witkowski, Mona M.

    2002-01-01

    A Risk Management Process has been tailored for Cassini that not only satisfies the requirements of NASA and JPL, but also allows the Program to proactively identify and assess risks that threaten mission objectives. Cassini Risk Management is a team effort that involves both management and engineering staff. The process is managed and facilitated by the Mission Assurance Manager (MAM), but requires regular interactions with Program Staff and team members to instill the risk management philosophy into the day to day mission operations. While Risk Management is well defined for projects in the development phase, it is a relatively new concept for Mission Operations. The Cassini team has embraced this process and has begun using it in an effective, proactive manner, to ensure mission success. It is hoped that the Cassini Risk Management Process will form the basis by which risk management is conducted during MO&DA on future projects. proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully implemented a Risk Management Process for mission operations, The initial SRL has been developed and input into he online tool. The Risk Management webbased system has been rolled out for use by the flight team and risk owners we working proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully

  8. Quick Fix for Managing Risks

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Under a Phase II SBIR contract, Kennedy and Lumina Decision Systems, Inc., jointly developed the Schedule and Cost Risk Analysis Modeling (SCRAM) system, based on a version of Lumina's flagship software product, Analytica(R). Acclaimed as "the best single decision-analysis program yet produced" by MacWorld magazine, Analytica is a "visual" tool used in decision-making environments worldwide to build, revise, and present business models, minus the time-consuming difficulty commonly associated with spreadsheets. With Analytica as their platform, Kennedy and Lumina created the SCRAM system in response to NASA's need to identify the importance of major delays in Shuttle ground processing, a critical function in project management and process improvement. As part of the SCRAM development project, Lumina designed a version of Analytica called the Analytica Design Engine (ADE) that can be easily incorporated into larger software systems. ADE was commercialized and utilized in many other developments, including web-based decision support.

  9. Essentials of Risk Management. Strategic Decisions. Board Basics.

    ERIC Educational Resources Information Center

    Sonenstein, Burton; Kumin, Laura A.

    1998-01-01

    This booklet, intended for trustees of institutions of higher education, offers some instruction on the principles of risk management. Introductory information provides a definition of risk management, which is seen as a planning and strategic function, not solely as a financial or safety assessment. Individual sections then address the following…

  10. Software risk management through independent verification and validation

    NASA Technical Reports Server (NTRS)

    Callahan, John R.; Zhou, Tong C.; Wood, Ralph

    1995-01-01

    Software project managers need tools to estimate and track project goals in a continuous fashion before, during, and after development of a system. In addition, they need an ability to compare the current project status with past project profiles to validate management intuition, identify problems, and then direct appropriate resources to the sources of problems. This paper describes a measurement-based approach to calculating the risk inherent in meeting project goals that leverages past project metrics and existing estimation and tracking models. We introduce the IV&V Goal/Questions/Metrics model, explain its use in the software development life cycle, and describe our attempts to validate the model through the reverse engineering of existing projects.

  11. Risk management of transmissible spongiform encephalopathies in Asia.

    PubMed

    Ozawa, Y

    2003-04-01

    A questionnaire-based survey was distributed to the Office International des Epizooties (OIE: World organisation for animal health) Member Countries in Asia to assess the use of risk management for transmissible spongiform encephalopathies. The author presents a summary of 16 responses received in July 2002. The survey revealed that import risk analysis on bovine spongiform encephalopathy (BSE) is not routinely carried out in ten countries, indicating an urgent need for further training courses. Although the number of ruminants imported from Europe is relatively small, significant quantities of feedstuffs of ruminant origin have been imported into Asia, which may mean that the BSE agent could have reached domestic cattle in most countries. The external challenge has been considerably reduced in recent years as most countries in Asia banned the importation of feedstuffs from countries with BSE, but a few weak spots which enable imports of risk materials still persist. Recycling of BSE through rendering plants is unlikely but cannot be totally excluded in some countries such as the People's Republic of China, India, Japan, Pakistan and Taipei China. Therefore, much more stringent management at slaughterhouses and rendering plants, as well as extensive surveillance programmes, are required in those countries. Bovine spongiform encephalopathy is not notifiable in six countries, indicating a total absence of risk management of BSE in those countries. Immediate actions by these governments to declare BSE a notifiable disease are considered necessary. Numbers of specimens tested for BSE are still very small in most countries in Asia, indicating a pressing need to upgrade surveillance programmes by introducing modern (economically affordable) diagnostic methods and by conducting practical training courses on epidemiological surveillance systems. With the exception of Japan, very little work has been performed on scrapie in Asia although the disease has been routinely

  12. Human health risk constrained naphthalene-contaminated groundwater remediation management through an improved credibility method.

    PubMed

    Li, Jing; Lu, Hongwei; Fan, Xing; Chen, Yizhong

    2017-07-01

    In this study, a human health risk constrained groundwater remediation management program based on the improved credibility is developed for naphthalene contamination. The program integrates simulation, multivariate regression analysis, health risk assessment, uncertainty analysis, and nonlinear optimization into a general framework. The improved credibility-based optimization model for groundwater remediation management with consideration of human health risk (ICOM-HHR) is capable of not only effectively addressing parameter uncertainties and risk-exceeding possibility in human health risk but also providing a credibility level that indicates the satisfaction of the optimal groundwater remediation strategies with multiple contributions of possibility and necessity. The capabilities and effectiveness of ICOM-HHR are illustrated through a real-world case study in Anhui Province, China. Results indicate that the ICOM-HHR would generate double remediation cost yet reduce approximately 10 times of the naphthalene concentrations at monitoring wells, i.e., mostly less than 1 μg/L, which implies that the ICOM-HHR usually results in better environmental and health risk benefits. And it is acceptable to obtain a better environmental quality and a lower health risk level with sacrificing a certain economic benefit.

  13. Resolving a double standard for risk management of thalidomide: an evaluation of two different risk management programmes in Japan.

    PubMed

    Ooba, Nobuhiro; Sato, Tsugumichi; Watanabe, Hikaru; Kubota, Kiyoshi

    2010-01-01

    Thalidomide, once withdrawn because of its teratogenicity, has now been re-launched worldwide. In Japan, thalidomide has been imported by individual doctors since around the year 2000. In October 2008, it was approved for the treatment of multiple myeloma (MM) by the Ministry of Health, Labour and Welfare (MHLW) on the condition that the manufacturer implemented a risk management programme termed the Thalidomide Education and Risk Management System (TERMS). It is likely that the imports of thalidomide will be used off-label to treat diseases other than MM. Thus, the MHLW is also planning to introduce a web-based registration system, referred to as the Safety Management System for Unapproved Drugs (SMUD), for thalidomide imported by individual doctors. To evaluate the difference between TERMS and SMUD and establish a way to resolve the 'double standard' for risk management of thalidomide treatment in Japan. The fraction of patients with disorders other than MM was estimated by the volume of annual imports obtained from the MHLW and records of the imports for patients with MM, other oncological diseases (ODs) and non-ODs in 2007 through a major supplier covering 63% of the total imported thalidomide. The information for TERMS was obtained from web pages of the manufacturer and the MHLW. The components of TERMS were compared with those in SMUD. Provided that the distribution of the indication for thalidomide (MM) in 2007, estimated from the records of imports through the major supplier, is representative of the entire nation, it is estimated that on average 866 patients, including 851 (98.3%) with MM, are using thalidomide on any one day. However, if the major supplier's imports, which account for 63% of the total imports, are not representative of the nation as a whole, possibly only half of the patients treated with thalidomide in Japan have MM. This would be the case in a scenario where the remaining 37% of imports are exclusively used to treat disorders other than

  14. The efficiency of asset management strategies to reduce urban flood risk.

    PubMed

    ten Veldhuis, J A E; Clemens, F H L R

    2011-01-01

    In this study, three asset management strategies were compared with respect to their efficiency to reduce flood risk. Data from call centres at two municipalities were used to quantify urban flood risks associated with three causes of urban flooding: gully pot blockage, sewer pipe blockage and sewer overloading. The efficiency of three flood reduction strategies was assessed based on their effect on the causes contributing to flood risk. The sensitivity of the results to uncertainty in the data source, citizens' calls, was analysed through incorporation of uncertainty ranges taken from customer complaint literature. Based on the available data it could be shown that increasing gully pot blockage is the most efficient action to reduce flood risk, given data uncertainty. If differences between cause incidences are large, as in the presented case study, call data are sufficient to decide how flood risk can be most efficiently reduced. According to the results of this analysis, enlargement of sewer pipes is not an efficient strategy to reduce flood risk, because flood risk associated with sewer overloading is small compared to other failure mechanisms.

  15. 12 CFR 390.466 - Risk-based capital credit risk-weight categories.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... receivable, other than credit-enhancing interest-only strips; (N)-(O) [Reserved] (P) That portion of equity... integral part of the State savings association's risk management system that explicitly incorporates the... subjective factors; (6) Employ independent credit risk management or loan review personnel to assign or...

  16. 12 CFR 167.6 - Risk-based capital credit risk-weight categories.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... strips receivable, other than credit-enhancing interest-only strips; (N)-(O) [Reserved] (P) That portion... rating systems typically: (1) Are an integral part of the savings association's risk management system... rating grade, including subjective factors; (6) Employ independent credit risk management or loan review...

  17. Agent-Based Simulations for Project Management

    NASA Technical Reports Server (NTRS)

    White, J. Chris; Sholtes, Robert M.

    2011-01-01

    Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

  18. Risk factors, health risks, and risk management for aircraft personnel and frequent flyers.

    PubMed

    Kim, Jeoum Nam; Lee, Byung Mu

    2007-01-01

    Health risks associated with long periods of time in flight are of concern to astronauts, crew members, and passengers. Many epidemiological studies showed that occupational and frequent flyers may be susceptible to ocular, cardiovascular, neurological, pulmonary, gastrointestinal, sensory, immunological, physiological, and even developmental disorders. In addition, the incidences of cancer and food poisoning are expected to be higher in such individuals. This article reviews health risks and risk factors associated with air travel, and discusses risk management strategies. To reduce adverse health risks, risk factors such as radiation, infection, stress, temperature, pressure, and circadian rhythm need to be avoided or reduced to levels that are as low as technologically achievable to protect flight personnel and passengers.

  19. Office-based Management of Recurrent Respiratory Papilloma.

    PubMed

    Motz, Kevin M; Hillel, Alexander T

    2016-06-01

    This review will highlight the indications and benefits of office-based therapy for recurrent respiratory papillomatosis (RRP) and discuss the utilization of photo-dynamic lasers and adjuvant medical therapy in office-based settings. Office-based management of RRP allows for more timely interventions, is preferred by the majority of patients, and negates the risk of general anesthesia. Current literature argues for the utilization of KTP laser over CO 2 laser for office-based treatment of RRP. Medical therapies for RRP are limited, but agents such as bevacizumab are promising and have been shown to reduce disease burden. Medical therapies that can induce disease remission are still needed. Office-based procedures save time and healthcare expenses compared to like procedures in the operating room. However, the increased frequency for office-based procedures predicts similar overall healthcare costs for office-based and OR laser excision of RRP. Office-based management of RRP is a feasible and well-tolerated strategy in appropriately selected patients with adequate local anesthesia.

  20. An Information Architect's View of Earth Observations for Disaster Risk Management

    NASA Astrophysics Data System (ADS)

    Moe, K.; Evans, J. D.; Cappelaere, P. G.; Frye, S. W.; Mandl, D.; Dobbs, K. E.

    2014-12-01

    Satellite observations play a significant role in supporting disaster response and risk management, however data complexity is a barrier to broader use especially by the public. In December 2013 the Committee on Earth Observation Satellites Working Group on Information Systems and Services documented a high-level reference model for the use of Earth observation satellites and associated products to support disaster risk management within the Global Earth Observation System of Systems context. The enterprise architecture identified the important role of user access to all key functions supporting situational awareness and decision-making. This paper focuses on the need to develop actionable information products from these Earth observations to simplify the discovery, access and use of tailored products. To this end, our team has developed an Open GeoSocial API proof-of-concept for GEOSS. We envision public access to mobile apps available on smart phones using common browsers where users can set up a profile and specify a region of interest for monitoring events such as floods and landslides. Information about susceptibility and weather forecasts about flood risks can be accessed. Users can generate geo-located information and photos of local events, and these can be shared on social media. The information architecture can address usability challenges to transform sensor data into actionable information, based on the terminology of the emergency management community responsible for informing the public. This paper describes the approach to collecting relevant material from the disasters and risk management community to address the end user needs for information. The resulting information architecture addresses the structural design of the shared information in the disasters and risk management enterprise. Key challenges are organizing and labeling information to support both online user communities and machine-to-machine processing for automated product generation.