Sample records for baseline load schedule

  1. A Baseline Load Schedule for the Manual Calibration of a Force Balance

    NASA Technical Reports Server (NTRS)

    Ulbrich, N.; Gisler, R.

    2013-01-01

    A baseline load schedule for the manual calibration of a force balance was developed that takes current capabilities at the NASA Ames Balance Calibration Laboratory into account. The load schedule consists of 18 load series with a total of 194 data points. It was designed to satisfy six requirements: (i) positive and negative loadings should be applied for each load component; (ii) at least three loadings should be applied between 0 % and 100 % load capacity; (iii) normal and side force loadings should be applied at the forward gage location, the aft gage location, and the balance moment center; (iv) the balance should be used in UP and DOWN orientation to get axial force loadings; (v) the constant normal and side force approaches should be used to get the rolling moment loadings; (vi) rolling moment loadings should be obtained for 0, 90, 180, and 270 degrees balance orientation. Three different approaches are also reviewed that may be used to independently estimate the natural zeros of the balance. These three approaches provide gage output differences that may be used to estimate the weight of both the metric and non-metric part of the balance. Manual calibration data of NASA s MK29A balance and machine calibration data of NASA s MC60D balance are used to illustrate and evaluate different aspects of the proposed baseline load schedule design.

  2. A Baseline Load Schedule for the Manual Calibration of a Force Balance

    NASA Technical Reports Server (NTRS)

    Ulbrich, N.; Gisler, R.

    2013-01-01

    A baseline load schedule for the manual calibration of a force balance is defined that takes current capabilities at the NASA Ames Balance Calibration Laboratory into account. The chosen load schedule consists of 18 load series with a total of 194 data points. It was designed to satisfy six requirements: (i) positive and negative loadings should be applied for each load component; (ii) at least three loadings should be applied between 0 % and 100 % load capacity; (iii) normal and side force loadings should be applied at the forward gage location, aft gage location, and the balance moment center; (iv) the balance should be used in "up" and "down" orientation to get positive and negative axial force loadings; (v) the constant normal and side force approaches should be used to get the rolling moment loadings; (vi) rolling moment loadings should be obtained for 0, 90, 180, and 270 degrees balance orientation. In addition, three different approaches are discussed in the paper that may be used to independently estimate the natural zeros, i.e., the gage outputs of the absolute load datum of the balance. These three approaches provide gage output differences that can be used to estimate the weight of both the metric and non-metric part of the balance. Data from the calibration of a six-component force balance will be used in the final manuscript of the paper to illustrate characteristics of the proposed baseline load schedule.

  3. An Elegant Sufficiency: Load-Aware Differentiated Scheduling of Data Transfers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kettimuthu, Rajkumar; Vardoyan, Gayane; Agrawal, Gagan

    2015-11-15

    We investigate the file transfer scheduling problem, where transfers among different endpoints must be scheduled to maximize pertinent metrics. We propose two new algorithms that exploit the fact that the aggregate bandwidth obtained over a network or at a storage system tends to increase with the number of concurrent transfers—but only up to a certain limit. The first algorithm, SEAL, uses runtime information and data-driven models to approximate system load and adapt transfer schedules and concurrency so as to maximize performance while avoiding saturation. We implement this algorithm using GridFTP as the transfer protocol and evaluate it using real transfermore » logs in a production WAN environment. Results show that SEAL can improve average slowdowns and turnaround times by up to 25% and worst-case slowdown and turnaround times by up to 50%, compared with the best-performing baseline scheme. Our second algorithm, STEAL, further leverages user-supplied categorization of transfers as either “interactive” (requiring immediate processing) or “batch” (less time-critical). Results show that STEAL reduces the average slowdown of interactive transfers by 63% compared to the best-performing baseline and by 21% compared to SEAL. For batch transfers, compared to the best-performing baseline, STEAL improves by 18% the utilization of the bandwidth unused by interactive transfers. By elegantly ensuring a sufficient, but not excessive, allocation of concurrency to the right transfers, we significantly improve overall performance despite constraints.« less

  4. Application of model predictive control for optimal operation of wind turbines

    NASA Astrophysics Data System (ADS)

    Yuan, Yuan; Cao, Pei; Tang, J.

    2017-04-01

    For large-scale wind turbines, reducing maintenance cost is a major challenge. Model predictive control (MPC) is a promising approach to deal with multiple conflicting objectives using the weighed sum approach. In this research, model predictive control method is applied to wind turbine to find an optimal balance between multiple objectives, such as the energy capture, loads on turbine components, and the pitch actuator usage. The actuator constraints are integrated into the objective function at the control design stage. The analysis is carried out in both the partial load region and full load region, and the performances are compared with those of a baseline gain scheduling PID controller. The application of this strategy achieves enhanced balance of component loads, the average power and actuator usages in partial load region.

  5. Project resource reallocation algorithm

    NASA Technical Reports Server (NTRS)

    Myers, J. E.

    1981-01-01

    A methodology for adjusting baseline cost estimates according to project schedule changes is described. An algorithm which performs a linear expansion or contraction of the baseline project resource distribution in proportion to the project schedule expansion or contraction is presented. Input to the algorithm consists of the deck of cards (PACE input data) prepared for the baseline project schedule as well as a specification of the nature of the baseline schedule change. Output of the algorithm is a new deck of cards with all work breakdown structure block and element of cost estimates redistributed for the new project schedule. This new deck can be processed through PACE to produce a detailed cost estimate for the new schedule.

  6. Assessment of New Load Schedules for the Machine Calibration of a Force Balance

    NASA Technical Reports Server (NTRS)

    Ulbrich, N.; Gisler, R.; Kew, R.

    2015-01-01

    New load schedules for the machine calibration of a six-component force balance are currently being developed and evaluated at the NASA Ames Balance Calibration Laboratory. One of the proposed load schedules is discussed in the paper. It has a total of 2082 points that are distributed across 16 load series. Several criteria were applied to define the load schedule. It was decided, for example, to specify the calibration load set in force balance format as this approach greatly simplifies the definition of the lower and upper bounds of the load schedule. In addition, all loads are assumed to be applied in a calibration machine by using the one-factor-at-a-time approach. At first, all single-component loads are applied in six load series. Then, three two-component load series are applied. They consist of the load pairs (N1, N2), (S1, S2), and (RM, AF). Afterwards, four three-component load series are applied. They consist of the combinations (N1, N2, AF), (S1, S2, AF), (N1, N2, RM), and (S1, S2, RM). In the next step, one four-component load series is applied. It is the load combination (N1, N2, S1, S2). Finally, two five-component load series are applied. They are the load combination (N1, N2, S1, S2, AF) and (N1, N2, S1, S2, RM). The maximum difference between loads of two subsequent data points of the load schedule is limited to 33 % of capacity. This constraint helps avoid unwanted load "jumps" in the load schedule that can have a negative impact on the performance of a calibration machine. Only loadings of the single- and two-component load series are loaded to 100 % of capacity. This approach was selected because it keeps the total number of calibration points to a reasonable limit while still allowing for the application of some of the more complex load combinations. Data from two of NASA's force balances is used to illustrate important characteristics of the proposed 2082-point calibration load schedule.

  7. Immunogenicity and safety of two doses of catch-up immunization with Haemophilus influenzae type b conjugate vaccine in Indian children living with HIV.

    PubMed

    Arya, Bikas K; Bhattacharya, Sangeeta Das; Sutcliffe, Catherine G; Saha, Malay K; Bhattacharyya, Subhasish; Niyogi, Swapan Kumar; Moss, William J; Panda, Samiran; Das, Ranjan Saurav; Mallick, Mausom; Mandal, Sutapa

    2016-04-27

    Children living with HIV are at increased risk of disease from Haemophilus influenzae type b (Hib). Data are limited on the immunogenicity of a two-dose, catch-up schedule for Hib conjugate vaccine (HibCV) among HIV-infected children accessing antiretroviral therapy (ART) late. The objectives of the study were to: (1) evaluate baseline immunity to Hib and the immunogenicity and safety of two doses of HibCV among HIV-infected Indian children; and (2) document the threshold antibody level required to prevent Hib colonization among HIV-infected children following immunization. We conducted a prospective cohort study among HIV-infected children 2-15 years of age and HIV-uninfected children 2-5 years of age. HIV-infected children received two doses of HibCV and uninfected children received one. Serum anti-Hib PRP IgG antibodies were measured at baseline and two months after immunization in the HIV-infected children. Nasopharyngeal (NP) swabs were collected at baseline and follow-up. 125 HIV-infected and 44 uninfected children participated. 40% of HIV-infected children were receiving ART and 26% had a viral load >100,000 copies/mL. The geometric mean concentration of serum anti-Hib PRP antibody increased from 0.25 μg/mL at baseline to 2.65 μg/mL after two doses of HibCV, representing a 10.6-fold increase (p<0.0001). 76% percent of HIV-infected children mounted an immune response. Moderate or severe immune suppression, trimethoprim/sulfamethoxazole prophylaxis, and lower baseline antibody levels were associated with lower post-vaccine serum anti-Hib PRP IgG antibodies. A serum anti-Hib PRP IgG antibody level ≥ 3.3 μg/mL was protective against Hib NP colonization. There were no differences in adverse events between HIV-infected and uninfected children. Including a catch-up immunization schedule for older HIV infected children in countries introducing Hib vaccines is important. Older HIV-infected children with delayed access to ART and without suppressed viral loads mounted an adequate immune response following two doses of HibCV. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. Optimal load scheduling in commercial and residential microgrids

    NASA Astrophysics Data System (ADS)

    Ganji Tanha, Mohammad Mahdi

    Residential and commercial electricity customers use more than two third of the total energy consumed in the United States, representing a significant resource of demand response. Price-based demand response, which is in response to changes in electricity prices, represents the adjustments in load through optimal load scheduling (OLS). In this study, an efficient model for OLS is developed for residential and commercial microgrids which include aggregated loads in single-units and communal loads. Single unit loads which include fixed, adjustable and shiftable loads are controllable by the unit occupants. Communal loads which include pool pumps, elevators and central heating/cooling systems are shared among the units. In order to optimally schedule residential and commercial loads, a community-based optimal load scheduling (CBOLS) is proposed in this thesis. The CBOLS schedule considers hourly market prices, occupants' comfort level, and microgrid operation constraints. The CBOLS' objective in residential and commercial microgrids is the constrained minimization of the total cost of supplying the aggregator load, defined as the microgrid load minus the microgrid generation. This problem is represented by a large-scale mixed-integer optimization for supplying single-unit and communal loads. The Lagrangian relaxation methodology is used to relax the linking communal load constraint and decompose the independent single-unit functions into subproblems which can be solved in parallel. The optimal solution is acceptable if the aggregator load limit and the duality gap are within the bounds. If any of the proposed criteria is not satisfied, the Lagrangian multiplier will be updated and a new optimal load schedule will be regenerated until both constraints are satisfied. The proposed method is applied to several case studies and the results are presented for the Galvin Center load on the 16th floor of the IIT Tower in Chicago.

  9. A rapid response air quality analysis system for use in projects having stringent quality assurance requirements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bowman, A.W.

    1990-04-01

    This paper describes an approach to solve air quality problems which frequently occur during iterations of the baseline change process. From a schedule standpoint, it is desirable to perform this evaluation in as short a time as possible while budgetary pressures limit the size of the staff available to do the work. Without a method in place to deal with baseline change proposal requests the environment analysts may not be able to produce the analysis results in the time frame expected. Using a concept called the Rapid Response Air Quality Analysis System (RAAS), the problems of timing and cost becomemore » tractable. The system could be adapted to assess other atmospheric pathway impacts, e.g., acoustics or visibility. The air quality analysis system used to perform the EA analysis (EA) for the Salt Repository Project (part of the Civilian Radioactive Waste Management Program), and later to evaluate the consequences of proposed baseline changes, consists of three components: Emission source data files; Emission rates contained in spreadsheets; Impact assessment model codes. The spreadsheets contain user-written codes (macros) that calculate emission rates from (1) emission source data (e.g., numbers and locations of sources, detailed operating schedules, and source specifications including horsepower, load factor, and duty cycle); (2) emission factors such as those published by the U.S. Environmental Protection Agency, and (3) control efficiencies.« less

  10. A distributed scheduling algorithm for heterogeneous real-time systems

    NASA Technical Reports Server (NTRS)

    Zeineldine, Osman; El-Toweissy, Mohamed; Mukkamala, Ravi

    1991-01-01

    Much of the previous work on load balancing and scheduling in distributed environments was concerned with homogeneous systems and homogeneous loads. Several of the results indicated that random policies are as effective as other more complex load allocation policies. The effects of heterogeneity on scheduling algorithms for hard real time systems is examined. A distributed scheduler specifically to handle heterogeneities in both nodes and node traffic is proposed. The performance of the algorithm is measured in terms of the percentage of jobs discarded. While a random task allocation is very sensitive to heterogeneities, the algorithm is shown to be robust to such non-uniformities in system components and load.

  11. Using Multiple Schedules During Functional Communication Training to Promote Rapid Transfer of Treatment Effects

    PubMed Central

    Fisher, Wayne W.; Greer, Brian D.; Fuhrman, Ashley M.; Querim, Angie C.

    2016-01-01

    Multiple schedules with signaled periods of reinforcement and extinction have been used to thin reinforcement schedules during functional communication training (FCT) to make the intervention more practical for parents and teachers. We evaluated whether these signals would also facilitate rapid transfer of treatment effects from one setting to the next and from one therapist to the next. With two children, we conducted FCT in the context of mixed (baseline) and multiple (treatment) schedules introduced across settings or therapists using a multiple baseline design. Results indicated that when the multiple schedules were introduced, the functional communication response came under rapid discriminative control, and problem behavior remained at near-zero rates. We extended these findings with another individual by using a more traditional baseline in which problem behavior produced reinforcement. Results replicated those of the previous participants and showed rapid reductions in problem behavior when multiple schedules were implemented across settings. PMID:26384141

  12. Using multiple schedules during functional communication training to promote rapid transfer of treatment effects.

    PubMed

    Fisher, Wayne W; Greer, Brian D; Fuhrman, Ashley M; Querim, Angie C

    2015-12-01

    Multiple schedules with signaled periods of reinforcement and extinction have been used to thin reinforcement schedules during functional communication training (FCT) to make the intervention more practical for parents and teachers. We evaluated whether these signals would also facilitate rapid transfer of treatment effects across settings and therapists. With 2 children, we conducted FCT in the context of mixed (baseline) and multiple (treatment) schedules introduced across settings or therapists using a multiple baseline design. Results indicated that when the multiple schedules were introduced, the functional communication response came under rapid discriminative control, and problem behavior remained at near-zero rates. We extended these findings with another individual by using a more traditional baseline in which problem behavior produced reinforcement. Results replicated those of the previous participants and showed rapid reductions in problem behavior when multiple schedules were implemented across settings. © Society for the Experimental Analysis of Behavior.

  13. Multi-layer service function chaining scheduling based on auxiliary graph in IP over optical network

    NASA Astrophysics Data System (ADS)

    Li, Yixuan; Li, Hui; Liu, Yuze; Ji, Yuefeng

    2017-10-01

    Software Defined Optical Network (SDON) can be considered as extension of Software Defined Network (SDN) in optical networks. SDON offers a unified control plane and makes optical network an intelligent transport network with dynamic flexibility and service adaptability. For this reason, a comprehensive optical transmission service, able to achieve service differentiation all the way down to the optical transport layer, can be provided to service function chaining (SFC). IP over optical network, as a promising networking architecture to interconnect data centers, is the most widely used scenarios of SFC. In this paper, we offer a flexible and dynamic resource allocation method for diverse SFC service requests in the IP over optical network. To do so, we firstly propose the concept of optical service function (OSF) and a multi-layer SFC model. OSF represents the comprehensive optical transmission service (e.g., multicast, low latency, quality of service, etc.), which can be achieved in multi-layer SFC model. OSF can also be considered as a special SF. Secondly, we design a resource allocation algorithm, which we call OSF-oriented optical service scheduling algorithm. It is able to address multi-layer SFC optical service scheduling and provide comprehensive optical transmission service, while meeting multiple optical transmission requirements (e.g., bandwidth, latency, availability). Moreover, the algorithm exploits the concept of Auxiliary Graph. Finally, we compare our algorithm with the Baseline algorithm in simulation. And simulation results show that our algorithm achieves superior performance than Baseline algorithm in low traffic load condition.

  14. Optimal Scheduling of Time-Shiftable Electric Loads in Expeditionary Power Grids

    DTIC Science & Technology

    2015-09-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA THESIS OPTIMAL SCHEDULING OF TIME-SHIFTABLE ELECTRIC LOADS IN EXPEDITIONARY POWER GRIDS by John G...to 09-25-2015 4. TITLE AND SUBTITLE OPTIMAL SCHEDULING OF TIME-SHIFTABLE ELECTRIC LOADS IN EXPEDI- TIONARY POWER GRIDS 5. FUNDING NUMBERS 6. AUTHOR(S...eliminate unmanaged peak demand, reduce generator peak-to-average power ratios, and facilitate a persistent shift to higher fuel efficiency. Using

  15. Using differential reinforcement to improve equine welfare: shaping appropriate truck loading and feet handling.

    PubMed

    Slater, Charlotte; Dymond, Simon

    2011-03-01

    Inappropriate behavior during common handling procedures with horses is often subject to aversive treatment. The present study replicated and extended previous findings using differential reinforcement to shape appropriate equine handling behavior. In Study 1, a multiple baseline across subjects design was used with four horses to determine first the effects of shaping target-touch responses and then successive approximations of full truck loading under continuous and intermittent schedules of reinforcement. Full loading responses were shaped and maintained in all four horses and occurrences of inappropriate behaviors reduced to zero. Generalization of the loading response was also observed to both a novel trainer and trailer. In Study 2, a changing criterion design was used to increase the duration of feet handling with one horse. The horse's responding reached the terminal duration criterion of 1min and showed consistent generalization and one-week maintenance. Overall, the results of both studies support the use of applied equine training systems based on positive reinforcement for increasing appropriate behavior during common handling procedures. 2011 Elsevier B.V. All rights reserved.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This appendix summarizes building characteristics used to determine heating and cooling loads for each of the five building types in each of the four regions. For the selected five buildings, the following data are attached: new and existing construction characteristics; new and existing construction thermal resistance; floor plan and elevation; people load schedule; lighting load schedule; appliance load schedule; ventilation schedule; and hot water use schedule. For the five building types (single family, apartment buildings, commercial buildings, office buildings, and schools), data are compiled in 10 appendices. These are Building Characteristics; Alternate Energy Sources and Energy Conservation Techniques Description, Costs,more » Fuel Price Scenarios; Life Cycle Cost Model; Simulation Models; Solar Heating/Cooling System; Condensed Weather; Single and Multi-Family Dwelling Characteristics and Energy Conservation Techniques; Mixed Strategies for Energy Conservation and Alternative Energy Utilization in Buildings. An extensive bibliography is given in the final appendix. (MCW)« less

  17. Gain-scheduled {{\\mathscr{H}}}_{\\infty } buckling control of a circular beam-column subject to time-varying axial loads

    NASA Astrophysics Data System (ADS)

    Schaeffner, Maximilian; Platz, Roland

    2018-06-01

    For slender beam-columns loaded by axial compressive forces, active buckling control provides a possibility to increase the maximum bearable axial load above that of a purely passive structure. In this paper, an approach for gain-scheduled {{\\mathscr{H}}}∞ buckling control of a slender beam-column with circular cross-section subject to time-varying axial loads is investigated experimentally. Piezo-elastic supports with integrated piezoelectric stack actuators at the beam-column ends allow an active stabilization in arbitrary lateral directions. The axial loads on the beam-column influence its lateral dynamic behavior and, eventually, cause the beam-column to buckle. A reduced modal model of the beam-column subject to axial loads including the dynamics of the electrical components is set up and calibrated with experimental data. Particularly, the linear parameter-varying open-loop plant is used to design a model-based gain-scheduled {{\\mathscr{H}}}∞ buckling control that is implemented in an experimental test setup. The beam-column is loaded by ramp- and step-shaped time-varying axial compressive loads that result in a lateral deformation of the beam-column due to imperfections, such as predeformation, eccentric loading or clamping moments. The lateral deformations and the maximum bearable loads of the beam-column are analyzed and compared for the beam-column with and without gain-scheduled {{\\mathscr{H}}}∞ buckling control or, respectively, active and passive configuration. With the proposed gain-scheduled {{\\mathscr{H}}}∞ buckling control it is possible to increase the maximum bearable load of the active beam-column by 19% for ramp-shaped axial loads and to significantly reduce the beam-column deformations for step-shaped axial loads compared to the passive structure.

  18. 48 CFR 1352.271-73 - Schedule of work.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...

  19. 48 CFR 1352.271-73 - Schedule of work.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...

  20. 48 CFR 1352.271-73 - Schedule of work.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...

  1. 48 CFR 1352.271-73 - Schedule of work.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...

  2. 48 CFR 1352.271-73 - Schedule of work.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...

  3. Smart sensing to drive real-time loads scheduling algorithm in a domotic architecture

    NASA Astrophysics Data System (ADS)

    Santamaria, Amilcare Francesco; Raimondo, Pierfrancesco; De Rango, Floriano; Vaccaro, Andrea

    2014-05-01

    Nowadays the focus on power consumption represent a very important factor regarding the reduction of power consumption with correlated costs and the environmental sustainability problems. Automatic control load based on power consumption and use cycle represents the optimal solution to costs restraint. The purpose of these systems is to modulate the power request of electricity avoiding an unorganized work of the loads, using intelligent techniques to manage them based on real time scheduling algorithms. The goal is to coordinate a set of electrical loads to optimize energy costs and consumptions based on the stipulated contract terms. The proposed algorithm use two new main notions: priority driven loads and smart scheduling loads. The priority driven loads can be turned off (stand by) according to a priority policy established by the user if the consumption exceed a defined threshold, on the contrary smart scheduling loads are scheduled in a particular way to don't stop their Life Cycle (LC) safeguarding the devices functions or allowing the user to freely use the devices without the risk of exceeding the power threshold. The algorithm, using these two kind of notions and taking into account user requirements, manages loads activation and deactivation allowing the completion their operation cycle without exceeding the consumption threshold in an off-peak time range according to the electricity fare. This kind of logic is inspired by industrial lean manufacturing which focus is to minimize any kind of power waste optimizing the available resources.

  4. Advancing the sleep/wake schedule impacts the sleep of African-Americans more than European-Americans.

    PubMed

    Paech, Gemma M; Crowley, Stephanie J; Fogg, Louis F; Eastman, Charmane I

    2017-01-01

    There are differences in sleep duration between Blacks/African-Americans and Whites/European-Americans. Recently, we found differences between these ancestry groups in the circadian system, such as circadian period and the magnitude of phase shifts. Here we document the role of ancestry on sleep and cognitive performance before and after a 9-h advance in the sleep/wake schedule similar to flying east or having a large advance in sleep times due to shiftwork, both of which produce extreme circadian misalignment. Non-Hispanic African and European-Americans (N = 20 and 17 respectively, aged 21-43 years) were scheduled to four baseline days each with 8 h time in bed based on their habitual sleep schedule. This sleep/wake schedule was then advanced 9 h earlier for three days. Sleep was monitored using actigraphy. During the last two baseline/aligned days and the first two advanced/misaligned days, beginning 2 h after waking, cognitive performance was measured every 3 h using the Automated Neuropsychological Assessment Metrics (ANAM) test battery. Mixed model ANOVAs assessed the effects of ancestry (African-American or European-American) and condition (baseline/aligned or advanced/misaligned) on sleep and cognitive performance. There was decreased sleep and impaired performance in both ancestry groups during the advanced/misaligned days compared to the baseline/aligned days. In addition, African-Americans obtained less sleep than European-Americans, especially on the first two days of circadian misalignment. Cognitive performance did not differ between African-Americans and European-Americans during baseline days. During the two advanced/misaligned days, however, African-Americans tended to perform slightly worse compared to European-Americans, particularly at times corresponding to the end of the baseline sleep episodes. Advancing the sleep/wake schedule, creating extreme circadian misalignment, had a greater impact on the sleep of African-Americans than European-Americans. Ancestry differences in sleep appear to be exacerbated when the sleep/wake schedule is advanced, which may have implications for individuals undertaking shiftwork and transmeridian travel.

  5. Marginal bone-level alterations of loaded zirconia and titanium dental implants: an experimental study in the dog mandible.

    PubMed

    Thoma, Daniel S; Benic, Goran I; Muñoz, Fernando; Kohal, Ralf; Sanz Martin, Ignacio; Cantalapiedra, Antonio G; Hämmerle, Christoph H F; Jung, Ronald E

    2016-04-01

    The aim was to test whether or not the marginal bone-level alterations of loaded zirconia implants are similar to the bone-level alterations of a grade 4 titanium one-piece dental implant. In six dogs, all premolars and the first molars were extracted in the mandible. Four months later, three zirconia implants (BPI, VC, ZD) and a control titanium one-piece (STM) implant were randomly placed in each hemimandible and left for transmucosal healing (baseline). Six months later, CAD/CAM crowns were cemented. Sacrifice was scheduled at 6-month postloading. Digital X-rays were taken at implant placement, crowns insertion, and sacrifice. Marginal bone-level alterations were calculated, and intra- and intergroup comparisons performed adjusted by confounding factors. Implants were successfully placed. Until crown insertion, two implants were fractured (one VC, one ZD). At sacrifice, 5 more implants were (partly) fractured (one BPI, four ZD), and one lost osseointegration (VC). No decementation of crowns occurred. All implant systems demonstrated a statistically significant (except VC) loss of marginal bone between baseline and crown insertion ranging from 0.29 mm (VC; P = 0.116) to 0.80 mm (ZD; P = 0.013). The estimated marginal bone loss between baseline and 6 months of loading ranged between 0.19 mm (BPI) and 1.11 mm (VC), being statistically significant for STM and VC only (P < 0.05). The changes in marginal bone levels were statistically significantly different between zirconia implants and control implants (STM vs. BPI P = 0.007; vs. VC P = 0.001; vs. ZD P = 0.011). Zirconia implants were more prone to fracture prior to and after loading with implant-supported crowns compared to titanium implants. Individual differences and variability in the extent of the bone-level changes during the 12-month study period were found between the different implant types and materials. © 2015 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  6. Quantification of baseline pupillary response and task-evoked pupillary response during constant and incremental task load.

    PubMed

    Mosaly, Prithima R; Mazur, Lukasz M; Marks, Lawrence B

    2017-10-01

    The methods employed to quantify the baseline pupil size and task-evoked pupillary response (TEPR) may affect the overall study results. To test this hypothesis, the objective of this study was to assess variability in baseline pupil size and TEPR during two basic working memory tasks: constant load of 3-letters memorisation-recall (10 trials), and incremental load memorisation-recall (two trials of each load level), using two commonly used methods (1) change from trail/load specific baseline, (2) change from constant baseline. Results indicated that there was a significant shift in baseline between the trails for constant load, and between the load levels for incremental load. The TEPR was independent of shifts in baseline using method 1 only for constant load, and method 2 only for higher levels of incremental load condition. These important findings suggest that the assessment of both the baseline and methods to quantify TEPR are critical in ergonomics application, especially in studies with small number of trials per subject per condition. Practitioner Summary: Quantification of TEPR can be affected by shifts in baseline pupil size that are most likely affected by non-cognitive factors when other external factors are kept constant. Therefore, quantification methods employed to compute both baseline and TEPR are critical in understanding the information processing of humans in practical ergonomics settings.

  7. Autonomous Hybrid Priority Queueing for Scheduling Residential Energy Demands

    NASA Astrophysics Data System (ADS)

    Kalimullah, I. Q.; Shamroukh, M.; Sahar, N.; Shetty, S.

    2017-05-01

    The advent of smart grid technologies has opened up opportunities to manage the energy consumption of the users within a residential smart grid system. Demand response management is particularly being employed to reduce the overall load on an electricity network which could in turn reduce outages and electricity costs. The objective of this paper is to develop an intelligible scheduler to optimize the energy available to a micro grid through hybrid queueing algorithm centered around the consumers’ energy demands. This is achieved by shifting certain schedulable load appliances to light load hours. Various factors such as the type of demand, grid load, consumers’ energy usage patterns and preferences are considered while formulating the logical constraints required for the algorithm. The algorithm thus obtained is then implemented in MATLAB workspace to simulate its execution by an Energy Consumption Scheduler (ECS) found within smart meters, which automatically finds the optimal energy consumption schedule tailor made to fit each consumer within the micro grid network.

  8. A Comparison of Escalating versus Fixed Reinforcement Schedules on Undergraduate Quiz Taking

    ERIC Educational Resources Information Center

    Mahoney, Amanda

    2017-01-01

    Drug abstinence studies indicate that escalating reinforcement schedules maintain abstinence for longer periods than fixed reinforcement schedules. The current study evaluated whether escalating reinforcement schedules would maintain more quiz taking than fixed reinforcement schedules. During baseline and for the control group, bonus points were…

  9. Augmentation of the space station module power management and distribution breadboard

    NASA Technical Reports Server (NTRS)

    Walls, Bryan; Hall, David K.; Lollar, Louis F.

    1991-01-01

    The space station module power management and distribution (SSM/PMAD) breadboard models power distribution and management, including scheduling, load prioritization, and a fault detection, identification, and recovery (FDIR) system within a Space Station Freedom habitation or laboratory module. This 120 VDC system is capable of distributing up to 30 kW of power among more than 25 loads. In addition to the power distribution hardware, the system includes computer control through a hierarchy of processes. The lowest level consists of fast, simple (from a computing standpoint) switchgear that is capable of quickly safing the system. At the next level are local load center processors, (LLP's) which execute load scheduling, perform redundant switching, and shed loads which use more than scheduled power. Above the LLP's are three cooperating artificial intelligence (AI) systems which manage load prioritizations, load scheduling, load shedding, and fault recovery and management. Recent upgrades to hardware and modifications to software at both the LLP and AI system levels promise a drastic increase in speed, a significant increase in functionality and reliability, and potential for further examination of advanced automation techniques. The background, SSM/PMAD, interface to the Lewis Research Center test bed, the large autonomous spacecraft electrical power system, and future plans are discussed.

  10. An incentive-based distributed mechanism for scheduling divisible loads in tree networks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carroll, T. E.; Grosu, D.

    The underlying assumption of Divisible Load Scheduling (DLS) theory is that the pro-cessors composing the network are obedient, i.e., they do not “cheat” the scheduling algorithm. This assumption is unrealistic if the processors are owned by autonomous, self-interested organizations that have no a priori motivation for cooperation and they will manipulate the algorithm if it is beneficial to do so. In this paper, we address this issue by designing a distributed mechanism for scheduling divisible loads in tree net-works, called DLS-T, which provides incentives to processors for reporting their true processing capacity and executing their assigned load at full processingmore » capacity. We prove that the DLS-T mechanism computes the optimal allocation in an ex post Nash equilibrium. Finally, we simulate and study the mechanism under various network structures and processor parameters.« less

  11. 75 FR 14103 - Version One Regional Reliability Standard for Resource and Demand Balancing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-24

    ... meant to maintain scheduled frequency and avoid loss of firm load following transmission or generation... capacity is available at all times to maintain scheduled frequency, and avoid loss of firm load following... the possibility that firm load could be shed due to the loss of a single element on the system.\\40...

  12. Teaching children with autism to use photographic activity schedules: maintenance and generalization of complex response chains.

    PubMed Central

    MacDuff, G S; Krantz, P J; McClannahan, L E

    1993-01-01

    We used a graduated guidance procedure to teach 4 boys with autism to follow photographic activity schedules to increase on-task and on-schedule behavior. The multiple baseline across participants design included baseline, teaching, maintenance, resequencing of photographs, and generalization to novel photographs phases. The results indicated that photographic activity schedules (albums depicting after-school activities) produced sustained engagement, and skills generalized to a new sequence of photographs and to new photographs. The acquisition of schedule-following skills enabled these children with severe developmental disabilities to display lengthy response chains, independently change activities, and change activities in different group home settings in the absence of immediate supervision and prompts from others. PMID:8473261

  13. Efficient Synthesis of Graph Methods: a Dynamically Scheduled Architecture

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Minutoli, Marco; Castellana, Vito G.; Tumeo, Antonino

    RDF databases naturally map to a graph representation and employ languages, such as SPARQL, that implements queries as graph pattern matching routines. Graph methods exhibit an irregular behavior: they present unpredictable, fine-grained data accesses, and are synchronization inten- sive. Graph data structures expose large amounts of dy- namic parallelism, but are difficult to partition without gen- erating load unbalance. In this paper, we present a novel ar- chitecture to improve the synthesis of graph methods. Our design addresses the issues of these algorithms with two com- ponents: a Dynamic Task Scheduler (DTS), which reduces load unbalance and maximize resource utilization,more » and a Hi- erarchical Memory Interface controller (HMI), which pro- vides support for concurrent memory operations on multi- ported/multi-banked shared memories. We evaluate our ap- proach by generating the accelerators for a set of SPARQL queries from the Lehigh University Benchmark (LUBM). We first analyze the load unbalance of these queries, showing that execution time among tasks can differ even of order of magnitudes. We then synthesize the queries and com- pare the performance of the resulting accelerators against the current state of the art. Experimental results show that our solution provides a speedup over the serial implementa- tion close to the theoretical maximum and a speedup up to 3.45 over a baseline parallel implementation. We conclude our study by exploring the design space to achieve maximum memory channels utilization. The best design used at least three of the four memory channels for more than 90% of the execution time.« less

  14. Advancing the sleep/wake schedule impacts the sleep of African-Americans more than European-Americans

    PubMed Central

    Crowley, Stephanie J.; Fogg, Louis F.; Eastman, Charmane I.

    2017-01-01

    There are differences in sleep duration between Blacks/African-Americans and Whites/European-Americans. Recently, we found differences between these ancestry groups in the circadian system, such as circadian period and the magnitude of phase shifts. Here we document the role of ancestry on sleep and cognitive performance before and after a 9-h advance in the sleep/wake schedule similar to flying east or having a large advance in sleep times due to shiftwork, both of which produce extreme circadian misalignment. Non-Hispanic African and European-Americans (N = 20 and 17 respectively, aged 21–43 years) were scheduled to four baseline days each with 8 h time in bed based on their habitual sleep schedule. This sleep/wake schedule was then advanced 9 h earlier for three days. Sleep was monitored using actigraphy. During the last two baseline/aligned days and the first two advanced/misaligned days, beginning 2 h after waking, cognitive performance was measured every 3 h using the Automated Neuropsychological Assessment Metrics (ANAM) test battery. Mixed model ANOVAs assessed the effects of ancestry (African-American or European-American) and condition (baseline/aligned or advanced/misaligned) on sleep and cognitive performance. There was decreased sleep and impaired performance in both ancestry groups during the advanced/misaligned days compared to the baseline/aligned days. In addition, African-Americans obtained less sleep than European-Americans, especially on the first two days of circadian misalignment. Cognitive performance did not differ between African-Americans and European-Americans during baseline days. During the two advanced/misaligned days, however, African-Americans tended to perform slightly worse compared to European-Americans, particularly at times corresponding to the end of the baseline sleep episodes. Advancing the sleep/wake schedule, creating extreme circadian misalignment, had a greater impact on the sleep of African-Americans than European-Americans. Ancestry differences in sleep appear to be exacerbated when the sleep/wake schedule is advanced, which may have implications for individuals undertaking shiftwork and transmeridian travel. PMID:29059251

  15. A Quantitative Causal-Comparative Study Examining the Effect of Block and Traditional Bell Schedules on Cognitive Load and Mathematics Academic Performance in High School Freshmen of the Southwestern USA

    ERIC Educational Resources Information Center

    Nogler, Tracey A.

    2017-01-01

    The purpose of this quantitative causal-comparative research was to examine if and to what extent there were differences in students' cognitive load and the subsequent academic performance based on block bell schedule and traditional bell schedule for freshmen in Algebra 1 in the Southwestern United States. This study included students from two…

  16. Star Scheduling Mode—A New Observing Strategy for Monitoring Weak Southern Radio Sources with the AuScope VLBI Array

    NASA Astrophysics Data System (ADS)

    McCallum, Lucia; Mayer, David; Le Bail, Karine; Schartner, Matthias; McCallum, Jamie; Lovell, Jim; Titov, Oleg; Shu, Fengchun; Gulyaev, Sergei

    2017-11-01

    The International Celestial Reference Frame suffers from significantly less observations in the southern hemisphere compared to the northern one. One reason for this is the historically low number of very long baseline interferometry radio telescopes in the south. The AuScope very long baseline interferometry array with three new telescopes on the Australian continent and an identical antenna in New Zealand were built to address this issue. While the overall number of observations in the south has greatly improved since then, a closer look reveals that this improvement is only true for strong radio sources (source flux densities >0.6 Jy). The new array of small very long baseline interferometry antennas has a relatively low baseline sensitivity so that only strong sources can be observed within a short integration time. A new observing strategy, the star scheduling mode, was developed to enable efficient observations of weak sources during geodetic sessions, through the addition of a single more sensitive antenna to the network. This scheduling mode was implemented in the Vienna very long baseline interferometry Software and applied in four 24-h sessions in 2016. These observations provide updated positions and source flux densities for 42 weak southern radio sources and significantly reduce the formal uncertainties for these sources. The star scheduling mode now allows the AuScope very long baseline interferometry array to undertake greater responsibility in monitoring sources in the southern sky, without significantly weakening the session for geodetic purposes.

  17. Power Management for Space Advanced Life Support

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2001-01-01

    Space power systems include the power source, storage, and management subsystems. In current crewed spacecraft, solar cells are the power source, batteries provide storage, and the crew performs any required load scheduling. For future crewed planetary surface systems using Advanced Life Support, we assume that plants will be grown to produce much of the crew's food and that nuclear power will be employed. Battery storage is much more costly than nuclear power capacity and so is not likely to be used. We investigate the scheduling of power demands by the crew or automatic control, to reduce the peak power load and the required generating capacity. The peak to average power ratio is a good measure of power use efficiency. We can easily schedule power demands to reduce the peak power from its maximum, but simple scheduling approaches may not find the lowest possible peak to average power ratio. An initial power scheduling example was simple enough for a human to solve, but a more complex example with many intermittent load demands required automatic scheduling. Excess power is a free resource and can be used even for minor benefits.

  18. Report of the DOE Review Committee on the baseline validation of the Superconducting Super Collider

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-08-01

    The Secretary of Energy directed that an independent review of the current cost and schedule baseline for the SSC be conducted. The purpose of this independent review was to validate the current cost and schedule baseline and to ensure that the project status is accurate as currently reported. Through May 1993, approximately $1.5 billion of the baseline cost of $8.249 billion had been expended, with project completion forecasted on the baseline schedule as of September 1999. This report documents the findings of the SSC Baseline Validation Review Committee (the Committee). The report is organized into five parts. The first sectionmore » is the Executive Summary. This introduction is followed by a discussion of the project progress/status as determined by the Committee. The next section describes the Committee`s estimate of the cost at completion for the SSC project, followed by an assessment of the adequacy of the business management systems currently being used to manage the project. The final section presents the Committee`s conclusions and recommendations. The main body of the report is followed by the subcommittee reports and appendices.« less

  19. Some Determinants of Remote Behavioral History Effects in Humans

    ERIC Educational Resources Information Center

    Hirai, Mariko; Okouchi, Hiroto; Matsumoto, Akio; Lattal, Kennon A.

    2011-01-01

    Undergraduates were exposed to a series of reinforcement schedules: first, to a fixed-ratio (FR) schedule in the presence of one stimulus and to a differential-reinforcement-of-low-rate (DRL) schedule in the presence of another (multiple FR DRL training), then to a fixed-interval (FI) schedule in the presence of a third stimulus (FI baseline),…

  20. Cloud computing task scheduling strategy based on differential evolution and ant colony optimization

    NASA Astrophysics Data System (ADS)

    Ge, Junwei; Cai, Yu; Fang, Yiqiu

    2018-05-01

    This paper proposes a task scheduling strategy DEACO based on the combination of Differential Evolution (DE) and Ant Colony Optimization (ACO), aiming at the single problem of optimization objective in cloud computing task scheduling, this paper combines the shortest task completion time, cost and load balancing. DEACO uses the solution of the DE to initialize the initial pheromone of ACO, reduces the time of collecting the pheromone in ACO in the early, and improves the pheromone updating rule through the load factor. The proposed algorithm is simulated on cloudsim, and compared with the min-min and ACO. The experimental results show that DEACO is more superior in terms of time, cost, and load.

  1. Scheduler software for tracking and data relay satellite system loading analysis: User manual and programmer guide

    NASA Technical Reports Server (NTRS)

    Craft, R.; Dunn, C.; Mccord, J.; Simeone, L.

    1980-01-01

    A user guide and programmer documentation is provided for a system of PRIME 400 minicomputer programs. The system was designed to support loading analyses on the Tracking Data Relay Satellite System (TDRSS). The system is a scheduler for various types of data relays (including tape recorder dumps and real time relays) from orbiting payloads to the TDRSS. Several model options are available to statistically generate data relay requirements. TDRSS time lines (representing resources available for scheduling) and payload/TDRSS acquisition and loss of sight time lines are input to the scheduler from disk. Tabulated output from the interactive system includes a summary of the scheduler activities over time intervals specified by the user and overall summary of scheduler input and output information. A history file, which records every event generated by the scheduler, is written to disk to allow further scheduling on remaining resources and to provide data for graphic displays or additional statistical analysis.

  2. flexplan: Mission Planning System for the Lunar Reconnaissance Orbiter

    NASA Technical Reports Server (NTRS)

    Barnoy, Assaf; Beech, Theresa

    2013-01-01

    flexplan is a mission planning and scheduling (MPS) tool that uses soft algorithms to define mission scheduling rules and constraints. This allows the operator to configure the tool for any mission without the need to modify or recompile code. In addition, flexplan uses an ID system to track every output on the schedule to the input from which it was generated. This allows flexplan to receive feedback as the schedules are executed, and update the status of all activities in a Web-based client. flexplan outputs include various planning reports, stored command loads for the Lunar Reconnaissance Orbiter (LRO), ephemeris loads, and pass scripts for automation.

  3. SPORT: An Algorithm for Divisible Load Scheduling with Result Collection on Heterogeneous Systems

    NASA Astrophysics Data System (ADS)

    Ghatpande, Abhay; Nakazato, Hidenori; Beaumont, Olivier; Watanabe, Hiroshi

    Divisible Load Theory (DLT) is an established mathematical framework to study Divisible Load Scheduling (DLS). However, traditional DLT does not address the scheduling of results back to source (i. e., result collection), nor does it comprehensively deal with system heterogeneity. In this paper, the DLSRCHETS (DLS with Result Collection on HET-erogeneous Systems) problem is addressed. The few papers to date that have dealt with DLSRCHETS, proposed simplistic LIFO (Last In, First Out) and FIFO (First In, First Out) type of schedules as solutions to DLSRCHETS. In this paper, a new polynomial time heuristic algorithm, SPORT (System Parameters based Optimized Result Transfer), is proposed as a solution to the DLSRCHETS problem. With the help of simulations, it is proved that the performance of SPORT is significantly better than existing algorithms. The other major contributions of this paper include, for the first time ever, (a) the derivation of the condition to identify the presence of idle time in a FIFO schedule for two processors, (b) the identification of the limiting condition for the optimality of FIFO and LIFO schedules for two processors, and (c) the introduction of the concept of equivalent processor in DLS for heterogeneous systems with result collection.

  4. Load Balancing in Cloud Computing Environment Using Improved Weighted Round Robin Algorithm for Nonpreemptive Dependent Tasks.

    PubMed

    Devi, D Chitra; Uthariaraj, V Rhymend

    2016-01-01

    Cloud computing uses the concepts of scheduling and load balancing to migrate tasks to underutilized VMs for effectively sharing the resources. The scheduling of the nonpreemptive tasks in the cloud computing environment is an irrecoverable restraint and hence it has to be assigned to the most appropriate VMs at the initial placement itself. Practically, the arrived jobs consist of multiple interdependent tasks and they may execute the independent tasks in multiple VMs or in the same VM's multiple cores. Also, the jobs arrive during the run time of the server in varying random intervals under various load conditions. The participating heterogeneous resources are managed by allocating the tasks to appropriate resources by static or dynamic scheduling to make the cloud computing more efficient and thus it improves the user satisfaction. Objective of this work is to introduce and evaluate the proposed scheduling and load balancing algorithm by considering the capabilities of each virtual machine (VM), the task length of each requested job, and the interdependency of multiple tasks. Performance of the proposed algorithm is studied by comparing with the existing methods.

  5. Load Balancing in Cloud Computing Environment Using Improved Weighted Round Robin Algorithm for Nonpreemptive Dependent Tasks

    PubMed Central

    Devi, D. Chitra; Uthariaraj, V. Rhymend

    2016-01-01

    Cloud computing uses the concepts of scheduling and load balancing to migrate tasks to underutilized VMs for effectively sharing the resources. The scheduling of the nonpreemptive tasks in the cloud computing environment is an irrecoverable restraint and hence it has to be assigned to the most appropriate VMs at the initial placement itself. Practically, the arrived jobs consist of multiple interdependent tasks and they may execute the independent tasks in multiple VMs or in the same VM's multiple cores. Also, the jobs arrive during the run time of the server in varying random intervals under various load conditions. The participating heterogeneous resources are managed by allocating the tasks to appropriate resources by static or dynamic scheduling to make the cloud computing more efficient and thus it improves the user satisfaction. Objective of this work is to introduce and evaluate the proposed scheduling and load balancing algorithm by considering the capabilities of each virtual machine (VM), the task length of each requested job, and the interdependency of multiple tasks. Performance of the proposed algorithm is studied by comparing with the existing methods. PMID:26955656

  6. PCA Based Stress Monitoring of Cylindrical Specimens Using PZTs and Guided Waves

    PubMed Central

    Mujica, Luis; Ruiz, Magda; Camacho, Johanatan

    2017-01-01

    Since mechanical stress in structures affects issues such as strength, expected operational life and dimensional stability, a continuous stress monitoring scheme is necessary for a complete integrity assessment. Consequently, this paper proposes a stress monitoring scheme for cylindrical specimens, which are widely used in structures such as pipelines, wind turbines or bridges. The approach consists of tracking guided wave variations due to load changes, by comparing wave statistical patterns via Principal Component Analysis (PCA). Each load scenario is projected to the PCA space by means of a baseline model and represented using the Q-statistical indices. Experimental validation of the proposed methodology is conducted on two specimens: (i) a 12.7 mm (1/2″) diameter, 0.4 m length, AISI 1020 steel rod, and (ii) a 25.4 mm (1″) diameter, 6m length, schedule 40, A-106, hollow cylinder. Specimen 1 was subjected to axial loads, meanwhile specimen 2 to flexion. In both cases, simultaneous longitudinal and flexural guided waves were generated via piezoelectric devices (PZTs) in a pitch-catch configuration. Experimental results show the feasibility of the approach and its potential use as in-situ continuous stress monitoring application. PMID:29194384

  7. A higher harmonic control test in the DNW to reduce impulsive BVI noise

    NASA Technical Reports Server (NTRS)

    Splettstoesser, Wolf R.; Schultz, KLAUS-J.; Kube, Roland; Brooks, Thomas F.; Booth, Earl R., Jr.; Niesl, Georg; Streby, Olivier

    1994-01-01

    A model rotor acoustic test was performed to examine the benefit of higher control (HHC) of blade pitch to reduce blade-vortex interaction (BVI) impulse noise. A 40-percent dynamically scaled, four-bladed model of a BO-105 main rotor was tested in the German-Dutch Wind Tunnel (DNW). Acoustic measurements were made in a large plane underneath the rotor employing a traversing in-flow microphone array in the anechoic environment of the open test section. Noise characteristics and noise directivity patterns as well as vibratory loads were measured and used to demonstrate the changes when different HHC schedules (different modes, amplitudes, phases) were applied. Dramatic changes of the acoustic signatures and the noise radiation directivity with HHC phase variations are found. Compared to the baseline conditions (without HHD), significant mid-frequency noise reductions of as much as 6 dB are obtained for low speed descent conditions where BVI is most intensive. For other rotor operating conditions with less intense BVI there is less or no benefit from the use of HHC. Low frequency loading noise and vibratory loads, especially at optimum noise reduction control settings, are found to increase.

  8. Effects of partitioning and scheduling sparse matrix factorization on communication and load balance

    NASA Technical Reports Server (NTRS)

    Venugopal, Sesh; Naik, Vijay K.

    1991-01-01

    A block based, automatic partitioning and scheduling methodology is presented for sparse matrix factorization on distributed memory systems. Using experimental results, this technique is analyzed for communication and load imbalance overhead. To study the performance effects, these overheads were compared with those obtained from a straightforward 'wrap mapped' column assignment scheme. All experimental results were obtained using test sparse matrices from the Harwell-Boeing data set. The results show that there is a communication and load balance tradeoff. The block based method results in lower communication cost whereas the wrap mapped scheme gives better load balance.

  9. Three-Stage Production Cost Modeling Approach for Evaluating the Benefits of Intra-Hour Scheduling between Balancing Authorities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Samaan, Nader A.; Milligan, Michael; Hunsaker, Matthew

    This paper introduces a Production Cost Modeling (PCM) approach to evaluate the benefits of intra-hour scheduling between Balancing Authorities (BAs). The system operation is modeled in a three-stage sequential manner: day ahead (DA)-hour ahead (HA)-real time (RT). In addition to contingency reserve, each BA will need to carry out “up” and “down” load following and regulation reserve capacity requirements in the DA and HA time frames. In the real-time simulation, only contingency and regulation reserves are carried out as load following is deployed. To model current real-time operation with hourly schedules, a new constraint was introduced to force each BAmore » net exchange schedule deviation from HA schedules to be within NERC ACE limits. Case studies that investigate the benefits of moving from hourly exchange schedules between WECC BAs into 10-min exchange schedules under two different levels of wind and solar penetration (11% and 33%) are presented.« less

  10. Three-Stage Production Cost Modeling Approach for Evaluating the Benefits of Intra-Hour Scheduling Between Balancing Authorities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Samaan, Nader; Milligan, Michael; Hunsaker, Matt

    This paper introduces a production cost modeling approach for evaluating the benefits of intra-hour scheduling among Balancing Authorities (BAs). System operation is modeled in a three-stage sequential manner: day ahead (DA)-hour ahead (HA) real time (RT). In addition to contingency reserve, each BA will need to carry out 'up' and 'down' load following and regulation reserve capacity requirements in the DA and HA time frames. In the RT simulation, only contingency and regulation reserves are carried out as load following is deployed. To model current RT operation with hourly schedules, a new constraint was introduced to force each BA netmore » exchange schedule deviation from HA schedules to be within North American Electric Reliability Corporation (NERC) area control error (ACE) limits. Case studies that investigate the benefits of moving from hourly exchange schedules between Western Electricity Coordinating Council (WECC) BAs into 10-minute exchange schedules under two different levels of wind and solar penetration (11% and 33%) are presented.« less

  11. Application of Hybrid Optimization-Expert System for Optimal Power Management on Board Space Power Station

    NASA Technical Reports Server (NTRS)

    Momoh, James; Chattopadhyay, Deb; Basheer, Omar Ali AL

    1996-01-01

    The space power system has two sources of energy: photo-voltaic blankets and batteries. The optimal power management problem on-board has two broad operations: off-line power scheduling to determine the load allocation schedule of the next several hours based on the forecast of load and solar power availability. The nature of this study puts less emphasis on speed requirement for computation and more importance on the optimality of the solution. The second category problem, on-line power rescheduling, is needed in the event of occurrence of a contingency to optimally reschedule the loads to minimize the 'unused' or 'wasted' energy while keeping the priority on certain type of load and minimum disturbance of the original optimal schedule determined in the first-stage off-line study. The computational performance of the on-line 'rescheduler' is an important criterion and plays a critical role in the selection of the appropriate tool. The Howard University Center for Energy Systems and Control has developed a hybrid optimization-expert systems based power management program. The pre-scheduler has been developed using a non-linear multi-objective optimization technique called the Outer Approximation method and implemented using the General Algebraic Modeling System (GAMS). The optimization model has the capability of dealing with multiple conflicting objectives viz. maximizing energy utilization, minimizing the variation of load over a day, etc. and incorporates several complex interaction between the loads in a space system. The rescheduling is performed using an expert system developed in PROLOG which utilizes a rule-base for reallocation of the loads in an emergency condition viz. shortage of power due to solar array failure, increase of base load, addition of new activity, repetition of old activity etc. Both the modules handle decision making on battery charging and discharging and allocation of loads over a time-horizon of a day divided into intervals of 10 minutes. The models have been extensively tested using a case study for the Space Station Freedom and the results for the case study will be presented. Several future enhancements of the pre-scheduler and the 'rescheduler' have been outlined which include graphic analyzer for the on-line module, incorporating probabilistic considerations, including spatial location of the loads and the connectivity using a direct current (DC) load flow model.

  12. Space Station needs, attributes and architectural options, volume 2, book 3: Cost and programmatics

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The cost and programmatic considerations which integrate mission requirements and architectural options into a cohesive system for exploitation of space opportunities within affordable limits are discussed. The mission requirements, baseline architecture, a top level baseline schedule, and acquisition costs are summarized. The work breakdown structure (WBS) used to structure the program, and the WBS dictionary are included. The costing approach used, including the operation of the primary costing tool, the SPACE cost model are described. The rationale for the choice of cost estimating relationships is given and costs at the module level are shown. Detailed costs at the subsystem level are shown. The baseline schedule and annual funding profiles are provided. Alternate schedules are developed to provide different funding profiles. Alternate funding sources are discussed and foreign and contractor participation is outlined. The results of the benefit analysis are given and the accrued benefits deriving from an implemented space station program are outlined.

  13. FALCON: A distributed scheduler for MIMD architectures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grimshaw, A.S.; Vivas, V.E. Jr.

    1991-01-01

    This paper describes FALCON (Fully Automatic Load COordinator for Networks), the scheduler for the Mentat parallel processing system. FALCON has a modular structure and is designed for systems that use a task scheduling mechanism. FALCON is distributed, stable, supports system heterogeneities, and employs a sender-initiated adaptive load sharing policy with static task assignment. FALCON is parameterizable and is implemented in Mentat, a working distributed system. We present the design and implementation of FALCON as well as a brief introduction to those features of the Mentat run-time system that influence FALCON. Performance measures under different scheduler configurations are also presented andmore » analyzed with respect to the system parameters. 36 refs., 8 figs.« less

  14. Space power system scheduling using an expert system

    NASA Technical Reports Server (NTRS)

    Bahrami, K. A.; Biefeld, E.; Costello, L.; Klein, J. W.

    1986-01-01

    A most pressing problem in space exploration is timely spacecraft power system sequence generation, which requires the scheduling of a set of loads given a set of resource constraints. This is particularly important after an anomaly or failure. This paper discusses the power scheduling problem and how the software program, Plan-It, can be used as a consultant for scheduling power system activities. Modeling of power activities, human interface, and two of the many strategies used by Plan-It are discussed. Preliminary results showing the development of a conflict-free sequence from an initial sequence with conflicts is presented. It shows that a 4-day schedule can be generated in a matter of a few minutes, which provides sufficient time in many cases to aid the crew in the replanning of loads and generation use following a failure or anomaly.

  15. Response deprivation, reinforcement, and economics

    PubMed Central

    Allison, James

    1993-01-01

    Reinforcement of an instrumental response results not from a special kind of response consequence known as a reinforcer, but from a special kind of schedule known as a response-deprivation schedule. Under the requirements of a response-deprivation schedule, the baseline rate of the instrumental response permits less than the baseline rate of the contingent response. Because reinforcement occurs only if the schedule deprives the organism of the contingent response, reinforcement cannot result from any intrinsic property of the contingent response or any property relative to the instrumental response. Two typical effects of response-deprivation schedules—facilitation of the instrumental response and suppression of the contingent response—are discussed in terms of economic concepts and models of instrumental performance. It is suggested that response deprivation makes the contingent response function as an economic good, the instrumental response as currency. PMID:16812695

  16. A De-centralized Scheduling and Load Balancing Algorithm for Heterogeneous Grid Environments

    NASA Technical Reports Server (NTRS)

    Arora, Manish; Das, Sajal K.; Biswas, Rupak

    2002-01-01

    In the past two decades, numerous scheduling and load balancing techniques have been proposed for locally distributed multiprocessor systems. However, they all suffer from significant deficiencies when extended to a Grid environment: some use a centralized approach that renders the algorithm unscalable, while others assume the overhead involved in searching for appropriate resources to be negligible. Furthermore, classical scheduling algorithms do not consider a Grid node to be N-resource rich and merely work towards maximizing the utilization of one of the resources. In this paper, we propose a new scheduling and load balancing algorithm for a generalized Grid model of N-resource nodes that not only takes into account the node and network heterogeneity, but also considers the overhead involved in coordinating among the nodes. Our algorithm is decentralized, scalable, and overlaps the node coordination time with that of the actual processing of ready jobs, thus saving valuable clock cycles needed for making decisions. The proposed algorithm is studied by conducting simulations using the Message Passing Interface (MPI) paradigm.

  17. A De-Centralized Scheduling and Load Balancing Algorithm for Heterogeneous Grid Environments

    NASA Technical Reports Server (NTRS)

    Arora, Manish; Das, Sajal K.; Biswas, Rupak; Biegel, Bryan (Technical Monitor)

    2002-01-01

    In the past two decades, numerous scheduling and load balancing techniques have been proposed for locally distributed multiprocessor systems. However, they all suffer from significant deficiencies when extended to a Grid environment: some use a centralized approach that renders the algorithm unscalable, while others assume the overhead involved in searching for appropriate resources to be negligible. Furthermore, classical scheduling algorithms do not consider a Grid node to be N-resource rich and merely work towards maximizing the utilization of one of the resources. In this paper we propose a new scheduling and load balancing algorithm for a generalized Grid model of N-resource nodes that not only takes into account the node and network heterogeneity, but also considers the overhead involved in coordinating among the nodes. Our algorithm is de-centralized, scalable, and overlaps the node coordination time of the actual processing of ready jobs, thus saving valuable clock cycles needed for making decisions. The proposed algorithm is studied by conducting simulations using the Message Passing Interface (MPI) paradigm.

  18. Incentive-compatible guaranteed renewable health insurance premiums.

    PubMed

    Herring, Bradley; Pauly, Mark V

    2006-05-01

    Theoretical models of guaranteed renewable insurance display front-loaded premium schedules. Such schedules both cover lifetime total claims of low-risk and high-risk individuals and provide an incentive for those who remain low-risk to continue to purchase the policy. Questions have been raised of whether actual individual insurance markets in the US approximate the behavior predicted by these models, both because young consumers may not be able to "afford" front-loading and because insurers may behave strategically in ways that erode the value of protection against risk reclassification. In this paper, the optimal competitive age-based premium schedule for a benchmark guaranteed renewable health insurance policy is estimated using medical expenditure data. Several factors are shown to reduce the amount of front-loading necessary. Indeed, the resulting optimal premium path increases with age. Actual premium paths exhibited by purchasers of individual insurance are close to the optimal renewable schedule we estimate. Finally, consumer utility associated with the feature is examined.

  19. Automation in the Space Station module power management and distribution Breadboard

    NASA Technical Reports Server (NTRS)

    Walls, Bryan; Lollar, Louis F.

    1990-01-01

    The Space Station Module Power Management and Distribution (SSM/PMAD) Breadboard, located at NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama, models the power distribution within a Space Station Freedom Habitation or Laboratory module. Originally designed for 20 kHz ac power, the system is now being converted to high voltage dc power with power levels on a par with those expected for a space station module. In addition to the power distribution hardware, the system includes computer control through a hierarchy of processes. The lowest level process consists of fast, simple (from a computing standpoint) switchgear, capable of quickly safing the system. The next level consists of local load center processors called Lowest Level Processors (LLP's). These LLP's execute load scheduling, perform redundant switching, and shed loads which use more than scheduled power. The level above the LLP's contains a Communication and Algorithmic Controller (CAC) which coordinates communications with the highest level. Finally, at this highest level, three cooperating Artificial Intelligence (AI) systems manage load prioritization, load scheduling, load shedding, and fault recovery and management. The system provides an excellent venue for developing and examining advanced automation techniques. The current system and the plans for its future are examined.

  20. Sleep and cognitive performance of African-Americans and European-Americans before and during circadian misalignment produced by an abrupt 9-h delay in the sleep/wake schedule

    PubMed Central

    Crowley, Stephanie J.; Eastman, Charmane I.

    2017-01-01

    We conducted two studies of circadian misalignment in non-Hispanic African and European-Americans. In the first, the sleep/wake (light/dark) schedule was advanced 9 h, similar to flying east, and in the second these schedules were delayed 9 h, similar to flying west or sleeping during the day after night work. We confirmed that the free-running circadian period is shorter in African-Americans compared to European-Americans, and found differences in the magnitude and direction of circadian rhythm phase shifts which were related to the circadian period. The sleep and cognitive performance data from the first study (published in this journal) documented the impairment in both ancestry groups due to this extreme circadian misalignment. African-Americans slept less and performed slightly worse during advanced/misaligned days than European-Americans. The current analysis is of sleep and cognitive performance from the second study. Participants were 23 African-Americans and 22 European-Americans (aged 18–44 years). Following four baseline days (8 h time in bed, based on habitual sleep), the sleep/wake schedule was delayed by 9 h for three days. Sleep was monitored using actigraphy. During the last two baseline/aligned days and the first two delayed/misaligned days, beginning 2 h after waking, cognitive performance was assessed every 3 h using the Automated Neuropsychological Assessment Metrics (ANAM) battery. Mixed model ANOVAs assessed the effects of ancestry (African-American or European-American) and condition (baseline/aligned or delayed/misaligned) on sleep and performance. There was decreased sleep and impaired cognitive performance in both ancestry groups during the two delayed/misaligned days relative to baseline/aligned days. Sleep and cognitive performance did not differ between African-Americans and European-Americans during either baseline/aligned or delayed/misaligned days. While our previous work showed that an advance in the sleep/wake schedule impaired the sleep of African-Americans more than European-Americans, delaying the sleep/wake schedule impaired the sleep and cognitive performance of African-Americans and European-Americans equally. PMID:29073187

  1. Dynamic Appliances Scheduling in Collaborative MicroGrids System

    PubMed Central

    Bilil, Hasnae; Aniba, Ghassane; Gharavi, Hamid

    2017-01-01

    In this paper a new approach which is based on a collaborative system of MicroGrids (MG’s), is proposed to enable household appliance scheduling. To achieve this, appliances are categorized into flexible and non-flexible Deferrable Loads (DL’s), according to their electrical components. We propose a dynamic scheduling algorithm where users can systematically manage the operation of their electric appliances. The main challenge is to develop a flattening function calculus (reshaping) for both flexible and non-flexible DL’s. In addition, implementation of the proposed algorithm would require dynamically analyzing two successive multi-objective optimization (MOO) problems. The first targets the activation schedule of non-flexible DL’s and the second deals with the power profiles of flexible DL’s. The MOO problems are resolved by using a fast and elitist multi-objective genetic algorithm (NSGA-II). Finally, in order to show the efficiency of the proposed approach, a case study of a collaborative system that consists of 40 MG’s registered in the load curve for the flattening program has been developed. The results verify that the load curve can indeed become very flat by applying the proposed scheduling approach. PMID:28824226

  2. Complexity of line-seru conversion for different scheduling rules and two improved exact algorithms for the multi-objective optimization.

    PubMed

    Yu, Yang; Wang, Sihan; Tang, Jiafu; Kaku, Ikou; Sun, Wei

    2016-01-01

    Productivity can be greatly improved by converting the traditional assembly line to a seru system, especially in the business environment with short product life cycles, uncertain product types and fluctuating production volumes. Line-seru conversion includes two decision processes, i.e., seru formation and seru load. For simplicity, however, previous studies focus on the seru formation with a given scheduling rule in seru load. We select ten scheduling rules usually used in seru load to investigate the influence of different scheduling rules on the performance of line-seru conversion. Moreover, we clarify the complexities of line-seru conversion for ten different scheduling rules from the theoretical perspective. In addition, multi-objective decisions are often used in line-seru conversion. To obtain Pareto-optimal solutions of multi-objective line-seru conversion, we develop two improved exact algorithms based on reducing time complexity and space complexity respectively. Compared with the enumeration based on non-dominated sorting to solve multi-objective problem, the two improved exact algorithms saves computation time greatly. Several numerical simulation experiments are performed to show the performance improvement brought by the two proposed exact algorithms.

  3. Load Balancing Integrated Least Slack Time-Based Appliance Scheduling for Smart Home Energy Management.

    PubMed

    Silva, Bhagya Nathali; Khan, Murad; Han, Kijun

    2018-02-25

    The emergence of smart devices and smart appliances has highly favored the realization of the smart home concept. Modern smart home systems handle a wide range of user requirements. Energy management and energy conservation are in the spotlight when deploying sophisticated smart homes. However, the performance of energy management systems is highly influenced by user behaviors and adopted energy management approaches. Appliance scheduling is widely accepted as an effective mechanism to manage domestic energy consumption. Hence, we propose a smart home energy management system that reduces unnecessary energy consumption by integrating an automated switching off system with load balancing and appliance scheduling algorithm. The load balancing scheme acts according to defined constraints such that the cumulative energy consumption of the household is managed below the defined maximum threshold. The scheduling of appliances adheres to the least slack time (LST) algorithm while considering user comfort during scheduling. The performance of the proposed scheme has been evaluated against an existing energy management scheme through computer simulation. The simulation results have revealed a significant improvement gained through the proposed LST-based energy management scheme in terms of cost of energy, along with reduced domestic energy consumption facilitated by an automated switching off mechanism.

  4. Changes in abundance of heterotrophic and coliform bacteria resident in stored water bodies in relation to incoming bacterial loads following rain events.

    PubMed

    Martin, Anthony Richard; Coombes, Peter John; Harrison, Tracey Lee; Hugh Dunstan, R

    2010-01-01

    Microbial properties of harvested rainwater were assessed at two study sites at Newcastle on the east coast of Australia. The investigation monitored daily counts of heterotrophic bacteria (HPC), total coliforms and E. coli during a mid-winter month (July). Immediately after a major rainfall event, increases in bacterial loads were observed at both sites, followed by gradual reductions in numbers to prior baseline levels within 7 days. Baseline HPC levels ranged from 500-1000 cfu/mL for the sites evaluated, and the loads following rain peaked at 3590-6690 cfu/mL. Baseline levels of total coliforms ranged from 0-100 cfu/100 mL and peaked at 480-1200 cfu/100 mL following rain. At Site 1, there was no evidence of E. coli loading associated with the rain events assessed, and Site 2 had no detectable E.coli colonies at baseline, with a peak load of 17 cfu/100 mL following rain which again diminished to baseline levels. It was concluded that rainfall events contributed to the bacterial load in rainwater storage systems, but processes within the rainwater storage ensured these incoming loads were not sustained.

  5. A manpower scheduling heuristic for aircraft maintenance application

    NASA Astrophysics Data System (ADS)

    Sze, San-Nah; Sze, Jeeu-Fong; Chiew, Kang-Leng

    2012-09-01

    This research studies a manpower scheduling for aircraft maintenance, focusing on in-flight food loading operation. A group of loading teams with flexible shifts is required to deliver and upload packaged meals from the ground kitchen to aircrafts in multiple trips. All aircrafts must be served within predefined time windows. The scheduling process takes into account of various constraints such as meal break allocation, multi-trip traveling and food exposure time limit. Considering the aircrafts movement and predefined maximum working hours for each loading team, the main objective of this study is to form an efficient roster by assigning a minimum number of loading teams to the aircrafts. We proposed an insertion based heuristic to generate the solutions in a short period of time for large instances. This proposed algorithm is implemented in various stages for constructing trips due to the presence of numerous constraints. The robustness and efficiency of the algorithm is demonstrated in computational results. The results show that the insertion heuristic more efficiently outperforms the company's current practice.

  6. Resistance to Extinction Following Variable-Interval Reinforcement: Reinforcer Rate and Amount

    ERIC Educational Resources Information Center

    Shull, Richard L.; Grimes, Julie A.

    2006-01-01

    Rats obtained food-pellet reinforcers by nose poking a lighted key. Experiment 1 examined resistance to extinction following single-schedule training with different variable-interval schedules, ranging from a mean interval of 16 min to 0.25 min. That is, for each schedule, the rats received 20 consecutive daily baseline sessions and then a session…

  7. Modular space station phase B extension program cost and schedules. Volume 1: Cost and schedule estimating process and results

    NASA Technical Reports Server (NTRS)

    Frassinelli, G. J.

    1972-01-01

    Cost estimates and funding schedules are presented for a given configuration and costing ground rules. Cost methodology is described and the cost evolution from a baseline configuration to a selected configuration is given, emphasizing cases in which cost was a design driver. Programmatic cost avoidance techniques are discussed.

  8. Integrated scheduling of a container handling system with simultaneous loading and discharging operations

    NASA Astrophysics Data System (ADS)

    Li, Chen; Lu, Zhiqiang; Han, Xiaole; Zhang, Yuejun; Wang, Li

    2016-03-01

    The integrated scheduling of container handling systems aims to optimize the coordination and overall utilization of all handling equipment, so as to minimize the makespan of a given set of container tasks. A modified disjunctive graph is proposed and a mixed 0-1 programming model is formulated. A heuristic algorithm is presented, in which the original problem is divided into two subproblems. In the first subproblem, contiguous bay crane operations are applied to obtain a good quay crane schedule. In the second subproblem, proper internal truck and yard crane schedules are generated to match the given quay crane schedule. Furthermore, a genetic algorithm based on the heuristic algorithm is developed to search for better solutions. The computational results show that the proposed algorithm can efficiently find high-quality solutions. They also indicate the effectiveness of simultaneous loading and discharging operations compared with separate ones.

  9. BVI impulsive noise reduction by higher harmonic pitch control - Results of a scaled model rotor experiment in the DNW

    NASA Technical Reports Server (NTRS)

    Splettstoesser, Wolf R.; Schultz, KLAUS-J.; Kube, Roland; Brooks, Thomas F.; Booth, Earl R., Jr.; Niesl, Georg; Streby, Olivier

    1991-01-01

    Results are presented of a model rotor acoustics test performed to examine the benefit of higher harmonic control (HHC) of blade pitch to reduce blade-vortex interaction (BVI) impulsive noise. A dynamically scaled, four-bladed, rigid rotor model, a 40-percent replica of the B0-105 main rotor, was tested in the German Dutch Wind Tunnel. Noise characteristics and noise directivity patterns as well as vibratory loads were measured and used to demonstrate the changes when different HHC schedules were applied. Dramatic changes of the acoustic signatures and the noise radiation directivity with the HHC phase variations are found. Compared to the baseline conditions (without HHC), significant mid-frequency noise reductions of locally 6 dB are obtained for low-speed descent conditions where GVI is most intense. For other rotor operating conditions with less intense BVI there is less or no benefit from the use of HHC. LF noise and vibratory loads, especially at optimum noise reduction control settings, are found to increase.

  10. Fair Energy Scheduling for Vehicle-to-Grid Networks Using Adaptive Dynamic Programming.

    PubMed

    Xie, Shengli; Zhong, Weifeng; Xie, Kan; Yu, Rong; Zhang, Yan

    2016-08-01

    Research on the smart grid is being given enormous supports worldwide due to its great significance in solving environmental and energy crises. Electric vehicles (EVs), which are powered by clean energy, are adopted increasingly year by year. It is predictable that the huge charge load caused by high EV penetration will have a considerable impact on the reliability of the smart grid. Therefore, fair energy scheduling for EV charge and discharge is proposed in this paper. By using the vehicle-to-grid technology, the scheduler controls the electricity loads of EVs considering fairness in the residential distribution network. We propose contribution-based fairness, in which EVs with high contributions have high priorities to obtain charge energy. The contribution value is defined by both the charge/discharge energy and the timing of the action. EVs can achieve higher contribution values when discharging during the load peak hours. However, charging during this time will decrease the contribution values seriously. We formulate the fair energy scheduling problem as an infinite-horizon Markov decision process. The methodology of adaptive dynamic programming is employed to maximize the long-term fairness by processing online network training. The numerical results illustrate that the proposed EV energy scheduling is able to mitigate and flatten the peak load in the distribution network. Furthermore, contribution-based fairness achieves a fast recovery of EV batteries that have deeply discharged and guarantee fairness in the full charge time of all EVs.

  11. Research on a Method of Geographical Information Service Load Balancing

    NASA Astrophysics Data System (ADS)

    Li, Heyuan; Li, Yongxing; Xue, Zhiyong; Feng, Tao

    2018-05-01

    With the development of geographical information service technologies, how to achieve the intelligent scheduling and high concurrent access of geographical information service resources based on load balancing is a focal point of current study. This paper presents an algorithm of dynamic load balancing. In the algorithm, types of geographical information service are matched with the corresponding server group, then the RED algorithm is combined with the method of double threshold effectively to judge the load state of serve node, finally the service is scheduled based on weighted probabilistic in a certain period. At the last, an experiment system is built based on cluster server, which proves the effectiveness of the method presented in this paper.

  12. Schedulers with load-store queue awareness

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, Tong; Eichenberger, Alexandre E.; Jacob, Arpith C.

    2017-02-07

    In one embodiment, a computer-implemented method includes tracking a size of a load-store queue (LSQ) during compile time of a program. The size of the LSQ is time-varying and indicates how many memory access instructions of the program are on the LSQ. The method further includes scheduling, by a computer processor, a plurality of memory access instructions of the program based on the size of the LSQ.

  13. Schedulers with load-store queue awareness

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, Tong; Eichenberger, Alexandre E.; Jacob, Arpith C.

    2017-01-24

    In one embodiment, a computer-implemented method includes tracking a size of a load-store queue (LSQ) during compile time of a program. The size of the LSQ is time-varying and indicates how many memory access instructions of the program are on the LSQ. The method further includes scheduling, by a computer processor, a plurality of memory access instructions of the program based on the size of the LSQ.

  14. Collaborative Resource Allocation

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Wax, Allan; Lam, Raymond; Baldwin, John; Borden, Chester

    2007-01-01

    Collaborative Resource Allocation Networking Environment (CRANE) Version 0.5 is a prototype created to prove the newest concept of using a distributed environment to schedule Deep Space Network (DSN) antenna times in a collaborative fashion. This program is for all space-flight and terrestrial science project users and DSN schedulers to perform scheduling activities and conflict resolution, both synchronously and asynchronously. Project schedulers can, for the first time, participate directly in scheduling their tracking times into the official DSN schedule, and negotiate directly with other projects in an integrated scheduling system. A master schedule covers long-range, mid-range, near-real-time, and real-time scheduling time frames all in one, rather than the current method of separate functions that are supported by different processes and tools. CRANE also provides private workspaces (both dynamic and static), data sharing, scenario management, user control, rapid messaging (based on Java Message Service), data/time synchronization, workflow management, notification (including emails), conflict checking, and a linkage to a schedule generation engine. The data structure with corresponding database design combines object trees with multiple associated mortal instances and relational database to provide unprecedented traceability and simplify the existing DSN XML schedule representation. These technologies are used to provide traceability, schedule negotiation, conflict resolution, and load forecasting from real-time operations to long-range loading analysis up to 20 years in the future. CRANE includes a database, a stored procedure layer, an agent-based middle tier, a Web service wrapper, a Windows Integrated Analysis Environment (IAE), a Java application, and a Web page interface.

  15. Late-onset Alzheimer's risk variants in memory decline, incident mild cognitive impairment, and Alzheimer's disease.

    PubMed

    Carrasquillo, Minerva M; Crook, Julia E; Pedraza, Otto; Thomas, Colleen S; Pankratz, V Shane; Allen, Mariet; Nguyen, Thuy; Malphrus, Kimberly G; Ma, Li; Bisceglio, Gina D; Roberts, Rosebud O; Lucas, John A; Smith, Glenn E; Ivnik, Robert J; Machulda, Mary M; Graff-Radford, Neill R; Petersen, Ronald C; Younkin, Steven G; Ertekin-Taner, Nilüfer

    2015-01-01

    We tested association of nine late-onset Alzheimer's disease (LOAD) risk variants from genome-wide association studies (GWAS) with memory and progression to mild cognitive impairment (MCI) or LOAD (MCI/LOAD) in older Caucasians, cognitively normal at baseline and longitudinally evaluated at Mayo Clinic Rochester and Jacksonville (n>2000). Each variant was tested both individually and collectively using a weighted risk score. APOE-e4 associated with worse baseline memory and increased decline with highly significant overall effect on memory. CLU-rs11136000-G associated with worse baseline memory and incident MCI/LOAD. MS4A6A-rs610932-C associated with increased incident MCI/LOAD and suggestively with lower baseline memory. ABCA7-rs3764650-C and EPHA1-rs11767557-A associated with increased rates of memory decline in subjects with a final diagnosis of MCI/LOAD. PICALM-rs3851179-G had an unexpected protective effect on incident MCI/LOAD. Only APOE-inclusive risk scores associated with worse memory and incident MCI/LOAD. The collective influence of the nine top LOAD GWAS variants on memory decline and progression to MCI/LOAD appears limited. Discovery of biologically functional variants at these loci may uncover stronger effects on memory and incident disease. Copyright © 2015 Elsevier Inc. All rights reserved.

  16. A high performance load balance strategy for real-time multicore systems.

    PubMed

    Cho, Keng-Mao; Tsai, Chun-Wei; Chiu, Yi-Shiuan; Yang, Chu-Sing

    2014-01-01

    Finding ways to distribute workloads to each processor core and efficiently reduce power consumption is of vital importance, especially for real-time systems. In this paper, a novel scheduling algorithm is proposed for real-time multicore systems to balance the computation loads and save power. The developed algorithm simultaneously considers multiple criteria, a novel factor, and task deadline, and is called power and deadline-aware multicore scheduling (PDAMS). Experiment results show that the proposed algorithm can greatly reduce energy consumption by up to 54.2% and the deadline times missed, as compared to the other scheduling algorithms outlined in this paper.

  17. A High Performance Load Balance Strategy for Real-Time Multicore Systems

    PubMed Central

    Cho, Keng-Mao; Tsai, Chun-Wei; Chiu, Yi-Shiuan; Yang, Chu-Sing

    2014-01-01

    Finding ways to distribute workloads to each processor core and efficiently reduce power consumption is of vital importance, especially for real-time systems. In this paper, a novel scheduling algorithm is proposed for real-time multicore systems to balance the computation loads and save power. The developed algorithm simultaneously considers multiple criteria, a novel factor, and task deadline, and is called power and deadline-aware multicore scheduling (PDAMS). Experiment results show that the proposed algorithm can greatly reduce energy consumption by up to 54.2% and the deadline times missed, as compared to the other scheduling algorithms outlined in this paper. PMID:24955382

  18. Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode

    PubMed Central

    Zhu, Xiaoning

    2014-01-01

    Rail mounted gantry crane (RMGC) scheduling is important in reducing makespan of handling operation and improving container handling efficiency. In this paper, we present an RMGC scheduling optimization model, whose objective is to determine an optimization handling sequence in order to minimize RMGC idle load time in handling tasks. An ant colony optimization is proposed to obtain near optimal solutions. Computational experiments on a specific railway container terminal are conducted to illustrate the proposed model and solution algorithm. The results show that the proposed method is effective in reducing the idle load time of RMGC. PMID:25538768

  19. Predictive Scheduling for Electric Vehicles Considering Uncertainty of Load and User Behaviors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Bin; Huang, Rui; Wang, Yubo

    2016-05-02

    Un-coordinated Electric Vehicle (EV) charging can create unexpected load in local distribution grid, which may degrade the power quality and system reliability. The uncertainty of EV load, user behaviors and other baseload in distribution grid, is one of challenges that impedes optimal control for EV charging problem. Previous researches did not fully solve this problem due to lack of real-world EV charging data and proper stochastic model to describe these behaviors. In this paper, we propose a new predictive EV scheduling algorithm (PESA) inspired by Model Predictive Control (MPC), which includes a dynamic load estimation module and a predictive optimizationmore » module. The user-related EV load and base load are dynamically estimated based on the historical data. At each time interval, the predictive optimization program will be computed for optimal schedules given the estimated parameters. Only the first element from the algorithm outputs will be implemented according to MPC paradigm. Current-multiplexing function in each Electric Vehicle Supply Equipment (EVSE) is considered and accordingly a virtual load is modeled to handle the uncertainties of future EV energy demands. This system is validated by the real-world EV charging data collected on UCLA campus and the experimental results indicate that our proposed model not only reduces load variation up to 40% but also maintains a high level of robustness. Finally, IEC 61850 standard is utilized to standardize the data models involved, which brings significance to more reliable and large-scale implementation.« less

  20. Load Balancing Integrated Least Slack Time-Based Appliance Scheduling for Smart Home Energy Management

    PubMed Central

    Silva, Bhagya Nathali; Khan, Murad; Han, Kijun

    2018-01-01

    The emergence of smart devices and smart appliances has highly favored the realization of the smart home concept. Modern smart home systems handle a wide range of user requirements. Energy management and energy conservation are in the spotlight when deploying sophisticated smart homes. However, the performance of energy management systems is highly influenced by user behaviors and adopted energy management approaches. Appliance scheduling is widely accepted as an effective mechanism to manage domestic energy consumption. Hence, we propose a smart home energy management system that reduces unnecessary energy consumption by integrating an automated switching off system with load balancing and appliance scheduling algorithm. The load balancing scheme acts according to defined constraints such that the cumulative energy consumption of the household is managed below the defined maximum threshold. The scheduling of appliances adheres to the least slack time (LST) algorithm while considering user comfort during scheduling. The performance of the proposed scheme has been evaluated against an existing energy management scheme through computer simulation. The simulation results have revealed a significant improvement gained through the proposed LST-based energy management scheme in terms of cost of energy, along with reduced domestic energy consumption facilitated by an automated switching off mechanism. PMID:29495346

  1. Power-based Shift Schedule for Pure Electric Vehicle with a Two-speed Automatic Transmission

    NASA Astrophysics Data System (ADS)

    Wang, Jiaqi; Liu, Yanfang; Liu, Qiang; Xu, Xiangyang

    2016-11-01

    This paper introduces a comprehensive shift schedule for a two-speed automatic transmission of pure electric vehicle. Considering about driving ability and efficiency performance of electric vehicles, the power-based shift schedule is proposed with three principles. This comprehensive shift schedule regards the vehicle current speed and motor load power as input parameters to satisfy the vehicle driving power demand with lowest energy consumption. A simulation model has been established to verify the dynamic and economic performance of comprehensive shift schedule. Compared with traditional dynamic and economic shift schedules, simulation results indicate that the power-based shift schedule is superior to traditional shift schedules.

  2. Optimal Scheduling Method of Controllable Loads in DC Smart Apartment Building

    NASA Astrophysics Data System (ADS)

    Shimoji, Tsubasa; Tahara, Hayato; Matayoshi, Hidehito; Yona, Atsushi; Senjyu, Tomonobu

    2015-12-01

    From the perspective of global warming suppression and the depletion of energy resources, renewable energies, such as the solar collector (SC) and photovoltaic generation (PV), have been gaining attention in worldwide. Houses or buildings with PV and heat pumps (HPs) are recently being used in residential areas widely due to the time of use (TOU) electricity pricing scheme which is essentially inexpensive during middle-night and expensive during day-time. If fixed batteries and electric vehicles (EVs) can be introduced in the premises, the electricity cost would be even more reduced. While, if the occupants arbitrarily use these controllable loads respectively, power demand in residential buildings may fluctuate in the future. Thus, an optimal operation of controllable loads such as HPs, batteries and EV should be scheduled in the buildings in order to prevent power flow from fluctuating rapidly. This paper proposes an optimal scheduling method of controllable loads, and the purpose is not only the minimization of electricity cost for the consumers, but also suppression of fluctuation of power flow on the power supply side. Furthermore, a novel electricity pricing scheme is also suggested in this paper.

  3. Cognitive decline in patients with Alzheimer's disease, vascular dementia and senile dementia of Lewy body type.

    PubMed

    Ballard, C; Patel, A; Oyebode, F; Wilcock, G

    1996-05-01

    One hundred and twenty-four patients with DSM-III-R dementia were assessed with a standardized battery which included the Geriatric Mental State Schedule, the History and Aetiology Schedule, the Secondary Dementia Schedule and the CAMCOG. Patients with Alzheimer's disease, vascular dementia and senile dementia of Lewy body type (SDLT) all had a similar degree of cognitive impairment at the time of the baseline interview. Patients with Alzheimer's disease and vascular dementia each experienced a mean decline of 27 points in patients with SDLT. Patients with SDLT had a significantly greater decline of verbal fluency than both the other groups. Women were significantly more impaired than men at the time of the baseline assessment but experienced a similar decline during the year of follow-up.

  4. Shift work schedule and night work load: Effects on body mass index - a four-year longitudinal study.

    PubMed

    Buchvold, Hogne Vikanes; Pallesen, Ståle; Waage, Siri; Bjorvatn, Bjørn

    2018-05-01

    Objectives The aim of this study was to investigate changes in body mass index (BMI) between different work schedules and different average number of yearly night shifts over a four-year follow-up period. Methods A prospective study of Norwegian nurses (N=2965) with different work schedules was conducted: day only, two-shift rotation (day and evening shifts), three-shift rotation (day, evening and night shifts), night only, those who changed towards night shifts, and those who changed away from schedules containing night shifts. Paired student's t-tests were used to evaluate within subgroup changes in BMI. Multiple linear regression analysis was used to evaluate between groups effects on BMI when adjusting for BMI at baseline, sex, age, marital status, children living at home, and years since graduation. The same regression model was used to evaluate the effect of average number of yearly night shifts on BMI change. Results We found that night workers [mean difference (MD) 1.30 (95% CI 0.70-1.90)], two shift workers [MD 0.48 (95% CI 0.20-0.75)], three shift workers [MD 0.46 (95% CI 0.30-0.62)], and those who changed work schedule away from [MD 0.57 (95% CI 0.17-0.84)] or towards night work [MD 0.63 (95% CI 0.20-1.05)] all had significant BMI gain (P<0.01) during the follow-up period. However, day workers had a non-significant BMI gain. Using adjusted multiple linear regressions, we found that night workers had significantly larger BMI gain compared to day workers [B=0.89 (95% CI 0.06-1.72), P<0.05]. We did not find any significant association between average number of yearly night shifts and BMI change using our multiple linear regression model. Conclusions After adjusting for possible confounders, we found that BMI increased significantly more among night workers compared to day workers.

  5. An improved robust buffer allocation method for the project scheduling problem

    NASA Astrophysics Data System (ADS)

    Ghoddousi, Parviz; Ansari, Ramin; Makui, Ahmad

    2017-04-01

    Unpredictable uncertainties cause delays and additional costs for projects. Often, when using traditional approaches, the optimizing procedure of the baseline project plan fails and leads to delays. In this study, a two-stage multi-objective buffer allocation approach is applied for robust project scheduling. In the first stage, some decisions are made on buffer sizes and allocation to the project activities. A set of Pareto-optimal robust schedules is designed using the meta-heuristic non-dominated sorting genetic algorithm (NSGA-II) based on the decisions made in the buffer allocation step. In the second stage, the Pareto solutions are evaluated in terms of the deviation from the initial start time and due dates. The proposed approach was implemented on a real dam construction project. The outcomes indicated that the obtained buffered schedule reduces the cost of disruptions by 17.7% compared with the baseline plan, with an increase of about 0.3% in the project completion time.

  6. Very long baseline interferometry applied to polar motion, relativity, and geodesy. Ph. D. thesis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ma, C.

    1978-01-01

    The causes and effects of diurnal polar motion are described. An algorithm was developed for modeling the effects on very long baseline interferometry observables. A selection was made between two three-station networks for monitoring polar motion. The effects of scheduling and the number of sources observed on estimated baseline errors are discussed. New hardware and software techniques in very long baseline interferometry are described.

  7. 14 CFR 135.63 - Recordkeeping requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... of gravity limits; (5) The center of gravity of the loaded aircraft, except that the actual center of gravity need not be computed if the aircraft is loaded according to a loading schedule or other approved method that ensures that the center of gravity of the loaded aircraft is within approved limits. In those...

  8. 14 CFR 135.63 - Recordkeeping requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... of gravity limits; (5) The center of gravity of the loaded aircraft, except that the actual center of gravity need not be computed if the aircraft is loaded according to a loading schedule or other approved method that ensures that the center of gravity of the loaded aircraft is within approved limits. In those...

  9. 14 CFR 135.63 - Recordkeeping requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... of gravity limits; (5) The center of gravity of the loaded aircraft, except that the actual center of gravity need not be computed if the aircraft is loaded according to a loading schedule or other approved method that ensures that the center of gravity of the loaded aircraft is within approved limits. In those...

  10. 14 CFR 135.63 - Recordkeeping requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... of gravity limits; (5) The center of gravity of the loaded aircraft, except that the actual center of gravity need not be computed if the aircraft is loaded according to a loading schedule or other approved method that ensures that the center of gravity of the loaded aircraft is within approved limits. In those...

  11. 14 CFR 135.63 - Recordkeeping requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... of gravity limits; (5) The center of gravity of the loaded aircraft, except that the actual center of gravity need not be computed if the aircraft is loaded according to a loading schedule or other approved method that ensures that the center of gravity of the loaded aircraft is within approved limits. In those...

  12. Contribution of Schedule Delays to Cost Growth: How to Make Peace with a Marching Army

    NASA Technical Reports Server (NTRS)

    Majerowicz, Walt; Bitten, Robert; Emmons, Debra; Shinn, Stephen A.

    2016-01-01

    Numerous research papers have shown that cost and schedule growth are interrelated for NASA space science missions. Although there has shown to be a strong correlation of cost growth with schedule growth, it is unclear what percentage of cost growth is caused by schedule growth and how schedule growth can be controlled. This paper attempts to quantify this percentage by looking at historical data and show detailed examples of how schedule growth influences cost growth. The paper also addresses a methodology to show an alternate approach for assessing and setting a robust baseline schedule and use schedule performance metrics to help assess if the project is performing to plan. Finally, recommendations are presented to help control schedule growth in order to minimize cost growth for NASA space science missions.

  13. Effects of Modeling Versus Instructions on Sensitivity to Reinforcement Schedules

    ERIC Educational Resources Information Center

    Neef, Nancy A.; Marckel, Julie; Ferreri, Summer; Jung, Sunhwa; Nist, Lindsay; Armstrong, Nancy

    2004-01-01

    This study examined the effects of modeling versus instructions on the choices of 3 typically developing children and 3 children with attention deficit hyperactivity disorder (ADHD) whose academic responding showed insensitivity to reinforcement schedules. During baseline, students chose between successively presented pairs of mathematics problems…

  14. ComprehensiveBench: a Benchmark for the Extensive Evaluation of Global Scheduling Algorithms

    NASA Astrophysics Data System (ADS)

    Pilla, Laércio L.; Bozzetti, Tiago C.; Castro, Márcio; Navaux, Philippe O. A.; Méhaut, Jean-François

    2015-10-01

    Parallel applications that present tasks with imbalanced loads or complex communication behavior usually do not exploit the underlying resources of parallel platforms to their full potential. In order to mitigate this issue, global scheduling algorithms are employed. As finding the optimal task distribution is an NP-Hard problem, identifying the most suitable algorithm for a specific scenario and comparing algorithms are not trivial tasks. In this context, this paper presents ComprehensiveBench, a benchmark for global scheduling algorithms that enables the variation of a vast range of parameters that affect performance. ComprehensiveBench can be used to assist in the development and evaluation of new scheduling algorithms, to help choose a specific algorithm for an arbitrary application, to emulate other applications, and to enable statistical tests. We illustrate its use in this paper with an evaluation of Charm++ periodic load balancers that stresses their characteristics.

  15. Efficient operation scheduling for adsorption chillers using predictive optimization-based control methods

    NASA Astrophysics Data System (ADS)

    Bürger, Adrian; Sawant, Parantapa; Bohlayer, Markus; Altmann-Dieses, Angelika; Braun, Marco; Diehl, Moritz

    2017-10-01

    Within this work, the benefits of using predictive control methods for the operation of Adsorption Cooling Machines (ACMs) are shown on a simulation study. Since the internal control decisions of series-manufactured ACMs often cannot be influenced, the work focuses on optimized scheduling of an ACM considering its internal functioning as well as forecasts for load and driving energy occurrence. For illustration, an assumed solar thermal climate system is introduced and a system model suitable for use within gradient-based optimization methods is developed. The results of a system simulation using a conventional scheme for ACM scheduling are compared to the results of a predictive, optimization-based scheduling approach for the same exemplary scenario of load and driving energy occurrence. The benefits of the latter approach are shown and future actions for application of these methods for system control are addressed.

  16. Operations mission planner beyond the baseline

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric; Cooper, Lynne

    1991-01-01

    The scheduling of Space Station Freedom must satisfy four major requirements. It must ensure efficient housekeeping operations, maximize the collection of science, respond to changes in tasking and available resources, and accommodate the above changes in a manner that minimizes disruption of the ongoing operations of the station. While meeting these requirements the scheduler must cope with the complexity, scope, and flexibility of SSF operations. This requires the scheduler to deal with an astronomical number of possible schedules. The Operations Mission Planner (OMP) is centered around minimally disruptive replanning and the use of heuristics limit search in scheduling. OMP has already shown several artificial intelligence based scheduling techniques such as Interleaved Iterative Refinement and Bottleneck Identification using Process Chronologies.

  17. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...) The degree to which the management process provides effective and integrated technical/schedule/cost... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Integrated Baseline...

  18. 48 CFR 1034.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... which the management process provides effective and integrated technical/schedule/cost planning and... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.202...

  19. Knowledge-based systems for power management

    NASA Technical Reports Server (NTRS)

    Lollar, L. F.

    1992-01-01

    NASA-Marshall's Electrical Power Branch has undertaken the development of expert systems in support of further advancements in electrical power system automation. Attention is given to the features (1) of the Fault Recovery and Management Expert System, (2) a resource scheduler or Master of Automated Expert Scheduling Through Resource Orchestration, and (3) an adaptive load-priority manager, or Load Priority List Management System. The characteristics of an advisory battery manager for the Hubble Space Telescope, designated the 'nickel-hydrogen expert system', are also noted.

  20. Randomized trial of HPV4 vaccine assessing the response to HPV4 vaccine in two schedules among Peruvian female sex workers.

    PubMed

    Brown, Brandon; Blas, Magaly; Cabral, Alejandra; Carcamo, Cesar; Gravitt, Patti; Halsey, Neal

    2012-03-16

    Two hundred female sex workers (FSWs) in Lima, Peru were randomized to receive HPV4 vaccine in the standard (0, 2, 6 months) or a modified schedule (0, 3, 6 months). One hundred and eighty four (92%) participants completed 3 doses of vaccine. Baseline seropositive rates were 58% for HPV6, 22.5% for HPV11, 41.5% for HPV16, and 13% for HPV18. The final geometric mean antibody titer (GMT) following vaccination was significantly greater for women who were seropositive at baseline compared to seronegative women: HPV6 (GMT ratio=2.3, p<0.01), HPV11 (GMT ratio=2.7, p<0.01), HPV16 (GMT ratio=1.3, p=0.04), and HPV18 (GMT ratio=2.4, p<0.01). Antibody titers in the modified schedule were not inferior to those in the standard schedule, suggesting the modified schedule may be paired with required STD visits. Although all women benefit from vaccination, administration at a younger age and before sexual debut is needed to achieve maximum protection from vaccine. Copyright © 2012 Elsevier Ltd. All rights reserved.

  1. Response-reinforcer dependency and resistance to change.

    PubMed

    Cançado, Carlos R X; Abreu-Rodrigues, Josele; Aló, Raquel Moreira; Hauck, Flávia; Doughty, Adam H

    2018-01-01

    The effects of the response-reinforcer dependency on resistance to change were studied in three experiments with rats. In Experiment 1, lever pressing produced reinforcers at similar rates after variable interreinforcer intervals in each component of a two-component multiple schedule. Across conditions, in the fixed component, all reinforcers were response-dependent; in the alternative component, the percentage of response-dependent reinforcers was 100, 50 (i.e., 50% response-dependent and 50% response-independent) or 10% (i.e., 10% response-dependent and 90% response-independent). Resistance to extinction was greater in the alternative than in the fixed component when the dependency in the former was 10%, but was similar between components when this dependency was 100 or 50%. In Experiment 2, a three-component multiple schedule was used. The dependency was 100% in one component and 10% in the other two. The 10% components differed on how reinforcers were programmed. In one component, as in Experiment 1, a reinforcer had to be collected before the scheduling of other response-dependent or independent reinforcers. In the other component, response-dependent and -independent reinforcers were programmed by superimposing a variable-time schedule on an independent variable-interval schedule. Regardless of the procedure used to program the dependency, resistance to extinction was greater in the 10% components than in the 100% component. These results were replicated in Experiment 3 in which, instead of extinction, VT schedules replaced the baseline schedules in each multiple-schedule component during the test. We argue that the relative change in dependency from Baseline to Test, which is greater when baseline dependencies are high rather than low, could account for the differential resistance to change in the present experiments. The inconsistencies in results across the present and previous experiments suggest that the effects of dependency on resistance to change are not well understood. Additional systematic analyses are important to further understand the effects of the response-reinforcer relation on resistance to change and to the development of a more comprehensive theory of behavioral persistence. © 2017 Society for the Experimental Analysis of Behavior.

  2. Long-term patterns in CD4 response are determined by an interaction between baseline CD4 cell count, viral load, and time: The Asia Pacific HIV Observational Database (APHOD).

    PubMed

    Egger, Sam; Petoumenos, Kathy; Kamarulzaman, Adeeba; Hoy, Jennifer; Sungkanuparph, Somnuek; Chuah, John; Falster, Kathleen; Zhou, Jialun; Law, Matthew G

    2009-04-15

    Random effects models were used to explore how the shape of CD4 cell count responses after commencing combination antiretroviral therapy (cART) develop over time and, in particular, the role of baseline and follow-up covariates. Patients in Asia Pacific HIV Observational Database who first commenced cART after January 1, 1997, and who had a baseline CD4 cell count and viral load measure and at least 1 follow-up measure between 6 and 24 months, were included. CD4 cell counts were determined at every 6-month period after the commencement of cART for up to 6 years. A total of 1638 patients fulfilled the inclusion criteria with a median follow-up time of 58 months. Lower post-cART mean CD4 cell counts were found to be associated with increasing age (P < 0.001), pre-cART hepatitis C coinfection (P = 0.038), prior AIDS (P = 0.019), baseline viral load < or equal to 100,000 copies per milliliter (P < 0.001), and the Asia Pacific region compared with Australia (P = 0.005). A highly significant 3-way interaction between the effects of time, baseline CD4 cell count, and post-cART viral burden (P < 0.0001) was demonstrated. Higher long-term mean CD4 cell counts were associated with lower baseline CD4 cell count and consistently undetectable viral loads. Among patients with consistently detectable viral load, CD4 cell counts seemed to converge for all baseline CD4 levels. Our analysis suggest that the long-term shape of post-cART CD4 cell count changes depends only on a 3-way interaction between baseline CD4 cell count, viral load response, and time.

  3. Residential Consumer-Centric Demand-Side Management Based on Energy Disaggregation-Piloting Constrained Swarm Intelligence: Towards Edge Computing

    PubMed Central

    Hu, Yu-Chen

    2018-01-01

    The emergence of smart Internet of Things (IoT) devices has highly favored the realization of smart homes in a down-stream sector of a smart grid. The underlying objective of Demand Response (DR) schemes is to actively engage customers to modify their energy consumption on domestic appliances in response to pricing signals. Domestic appliance scheduling is widely accepted as an effective mechanism to manage domestic energy consumption intelligently. Besides, to residential customers for DR implementation, maintaining a balance between energy consumption cost and users’ comfort satisfaction is a challenge. Hence, in this paper, a constrained Particle Swarm Optimization (PSO)-based residential consumer-centric load-scheduling method is proposed. The method can be further featured with edge computing. In contrast with cloud computing, edge computing—a method of optimizing cloud computing technologies by driving computing capabilities at the IoT edge of the Internet as one of the emerging trends in engineering technology—addresses bandwidth-intensive contents and latency-sensitive applications required among sensors and central data centers through data analytics at or near the source of data. A non-intrusive load-monitoring technique proposed previously is utilized to automatic determination of physical characteristics of power-intensive home appliances from users’ life patterns. The swarm intelligence, constrained PSO, is used to minimize the energy consumption cost while considering users’ comfort satisfaction for DR implementation. The residential consumer-centric load-scheduling method proposed in this paper is evaluated under real-time pricing with inclining block rates and is demonstrated in a case study. The experimentation reported in this paper shows the proposed residential consumer-centric load-scheduling method can re-shape loads by home appliances in response to DR signals. Moreover, a phenomenal reduction in peak power consumption is achieved by 13.97%. PMID:29702607

  4. Research on intelligent power consumption strategy based on time-of-use pricing

    NASA Astrophysics Data System (ADS)

    Fu, Wei; Gong, Li; Chen, Heli; He, Yu

    2017-06-01

    In this paper, through the analysis of shortcomings of the current domestic and foreign household power consumption strategy: Passive way of power consumption, ignoring the different priority of electric equipment, neglecting the actual load pressure of the grid, ignoring the interaction with the user, to decrease the peak-valley difference and improve load curve in residential area by demand response (DR technology), an intelligent power consumption scheme based on time-of-use(TOU) pricing for household appliances is proposed. The main contribution of this paper is: (1) Three types of household appliance loads are abstracted from different operating laws of various household appliances, and the control models and DR strategies corresponding to these types are established. (2) The fuzzified processing for the information of TOU price, which is based on the time intervals, is performed to get the price priority, in accordance with such DR events as the maximum restricted load of DR, the time of DR and the duration of interruptible load and so on, the DR control rule and pre-scheduling mechanism are led in. (3) The dispatching sequence of household appliances in the control and scheduling queue are switched and controlled to implement the equilibrium of peak and valley loads. The equilibrium effects and economic benefits of power system by pre-scheduling and DR dispatching are compared and analyzed by simulation example, and the results show that using the proposed household appliance control (HAC) scheme the overall cost of consumers can be reduced and the power system load can be alleviated, so the proposed household appliance control (HAC) scheme is feasible and reasonable.

  5. Research on virtual network load balancing based on OpenFlow

    NASA Astrophysics Data System (ADS)

    Peng, Rong; Ding, Lei

    2017-08-01

    The Network based on OpenFlow technology separate the control module and data forwarding module. Global deployment of load balancing strategy through network view of control plane is fast and of high efficiency. This paper proposes a Weighted Round-Robin Scheduling algorithm for virtual network and a load balancing plan for server load based on OpenFlow. Load of service nodes and load balancing tasks distribution algorithm will be taken into account.

  6. Automation of the space station core module power management and distribution system

    NASA Technical Reports Server (NTRS)

    Weeks, David J.

    1988-01-01

    Under the Advanced Development Program for Space Station, Marshall Space Flight Center has been developing advanced automation applications for the Power Management and Distribution (PMAD) system inside the Space Station modules for the past three years. The Space Station Module Power Management and Distribution System (SSM/PMAD) test bed features three artificial intelligence (AI) systems coupled with conventional automation software functioning in an autonomous or closed-loop fashion. The AI systems in the test bed include a baseline scheduler/dynamic rescheduler (LES), a load shedding management system (LPLMS), and a fault recovery and management expert system (FRAMES). This test bed will be part of the NASA Systems Autonomy Demonstration for 1990 featuring cooperating expert systems in various Space Station subsystem test beds. It is concluded that advanced automation technology involving AI approaches is sufficiently mature to begin applying the technology to current and planned spacecraft applications including the Space Station.

  7. Artificial Immune Algorithm for Subtask Industrial Robot Scheduling in Cloud Manufacturing

    NASA Astrophysics Data System (ADS)

    Suma, T.; Murugesan, R.

    2018-04-01

    The current generation of manufacturing industry requires an intelligent scheduling model to achieve an effective utilization of distributed manufacturing resources, which motivated us to work on an Artificial Immune Algorithm for subtask robot scheduling in cloud manufacturing. This scheduling model enables a collaborative work between the industrial robots in different manufacturing centers. This paper discussed two optimizing objectives which includes minimizing the cost and load balance of industrial robots through scheduling. To solve these scheduling problems, we used the algorithm based on Artificial Immune system. The parameters are simulated with MATLAB and the results compared with the existing algorithms. The result shows better performance than existing.

  8. MS212--A Homogeneous Sputtered Solid Lubricant Coating for Use to 800 C

    NASA Technical Reports Server (NTRS)

    Sliney, Harold E.; Waters, William J.; Soltis, Richard

    1997-01-01

    Composite coatings containing chromium carbide, stable fluorides and silver were prepared by magnetron sputtering. The microstructure of the coatings is very homogeneous compared to that of plasma sprayed and sintered versions of the same chemical composition. Friction and wear of MS212-coated and baseline uncoated aluminum and Inconel X-750 are compared. At room temperature, the friction and wear of coated aluminum is dramatically better compared to the baseline. The acceptable load is limited by deformation of the soft aluminum substrate. In the case of the nickel alloy, lower friction is observed for the coated alloy at all temperatures up to the maximum test temperature of 800 C. Pin wear factors for sliding against the coated alloy are lower than the baseline at room temperature and 350 C, and comparable to baseline wear at higher test temperatures. Low baseline wear at high temperatures is due to the lubricious nature of the natural oxides formed on nickel-chromium alloys in a hot, oxidizing atmosphere. No load limit was found for coated Inconel X-750 at loads up to five times the load limit for coated aluminum.

  9. Implementation of a Posted Schedule to Increase Class-Wide Interobserver Agreement Assessment

    ERIC Educational Resources Information Center

    Doucette, Stefanie; DiGennaro Reed, Florence D.; Reed, Derek D.; Maguire, Helena; Marquardt, Heidi

    2012-01-01

    The present study investigated the impact of an antecedent intervention in the form of a daily posted schedule on the interobserver agreement (IOA) assessment of educational goals implemented within a classroom at a private school serving individuals with disabilities. During baseline, the percentage of academic goals with interobserver agreement…

  10. Dissolved-solids loads discharged from irrigated areas near Manila, Utah, May 2007-October 2012, and relation of loads to selected variables

    USGS Publications Warehouse

    Thiros, Susan A.; Gerner, Steven J.

    2015-01-01

    Irrigation improvements began to be implemented in 2007 to reduce dissolved-solids loads discharged from the MWSP area. The theoretical annual net dissolved-solids load where the cumulative NRCS calculated dissolved-solids load reduction is added to the net MWSP dissolved-solids load is what would be expected if there was no irrigation improvement in the area associated with the MWSP. The theoretical data points lie very near the baseline representing the pre-MWSP dissolved-solids load to canal streamflow relation. The proximity of the theoretical data points to the baseline shows that the NRCS calculations of reduction in dissolved-solids load are generally supported by the data collected during this study.

  11. Baseline response rates affect resistance to change.

    PubMed

    Kuroda, Toshikazu; Cook, James E; Lattal, Kennon A

    2018-01-01

    The effect of response rates on resistance to change, measured as resistance to extinction, was examined in two experiments. In Experiment 1, responding in transition from a variable-ratio schedule and its yoked-interval counterpart to extinction was compared with pigeons. Following training on a multiple variable-ratio yoked-interval schedule of reinforcement, in which response rates were higher in the former component, reinforcement was removed from both components during a single extended extinction session. Resistance to extinction in the yoked-interval component was always either greater or equal to that in the variable-ratio component. In Experiment 2, resistance to extinction was compared for two groups of rats that exhibited either high or low response rates when maintained on identical variable-interval schedules. Resistance to extinction was greater for the lower-response-rate group. These results suggest that baseline response rate can contribute to resistance to change. Such effects, however, can only be revealed when baseline response rate and reinforcement rate are disentangled (Experiments 1 and 2) from the more usual circumstance where the two covary. Furthermore, they are more cleanly revealed when the programmed contingencies controlling high and low response rates are identical, as in Experiment 2. © 2017 Society for the Experimental Analysis of Behavior.

  12. Detection of atmospheric pressure loading using very long baseline interferometry measurements

    NASA Technical Reports Server (NTRS)

    Vandam, T. M.; Herring, T. A.

    1994-01-01

    Loading of the Earth by the temporal redistribution of global atmospheric mass is likely to displace the positions of geodetic monuments by tens of millimeters both vertically and horizontally. Estimates of these displacements are determined by convolving National Meteorological Center (NMC) global values of atmospheric surface pressure with Farrell's elastic Green's functions. An analysis of the distances between radio telescopes determined by very long baseline interferometry (VLBI) between 1984 and 1992 reveals that in many of the cases studied there is a significant contribution to baseline length change due to atmospheric pressure loading. Our analysis covers intersite distances of between 1000 and 10,000 km and is restricted to those baselines measured more than 100 times. Accounting for the load effects (after first removing a best fit slope) reduces the weighted root-mean-square (WRMS) scatter of the baseline length residuals on 11 of the 22 baselines investigated. The slight degradation observed in the WRMS scatter on the remaining baselines is largely consistent with the expected statistical fluctuations when a small correction is applied to a data set having a much larger random noise. The results from all baselines are consistent with approximately 60% of the computed pressure contribution being present in the VLBI length determinations. Site dependent coefficients determined by fitting local pressure to the theoretical radial displacement are found to reproduce the deformation caused by the regional pressure to within 25% for most inland sites. The coefficients are less reliable at near coastal and island stations.

  13. Influence of crop load on almond tree water status and its importance in irrigation scheduling

    NASA Astrophysics Data System (ADS)

    Puerto Conesa, Pablo; Domingo Miguel, Rafael; Torres Sánchez, Roque; Pérez Pastor, Alejandro

    2014-05-01

    In the Mediterranean area water is the main factor limiting crop production and therefore irrigation is essential to achieve economically viable yields. One of the fundamental techniques to ensure that irrigation water is managed efficiently with maximum productivity and minimum environmental impact is irrigation scheduling. The fact that the plant water status integrates atmospheric demand and soil water content conditions encourages the use of plant-based water status indicators. Some researchers have successfully scheduled irrigation in certain fruit trees by maintaining the maximum daily trunk diameter shrinkage (MDS) signal intensity at threshold values to generate (or not) water stress. However MDS not only depends on the climate and soil water content, but may be affected by tree factors such as age, size, phenological stage and fruit load. There is therefore a need to quantify the influence of these factors on MDS. The main objective of this work was to study the effects of crop load on tree water relations for scheduling purposes. We particularly focused on MDS vs VPD10-15 (mean air vapor pressure deficit during the period 10.00-15.00 h solar time) for different loads and phenological phases under non-limiting soil water conditions. The experiment was carried out in 2011 in a 1 ha plot in SE Spain with almond trees (Prunus dulcis (Mill.) D.A. Webb cv. 'Marta'). Three crop load treatments were studied according to three crop load levels, i) T100, high crop load, characteristic crop load, ii) T50, medium crop load, in which 50% of the fruits were removed and iii) T0, practically without fruits. Fruits were manually thinned. Each treatment, randomly distributed in blocks, was run in triplicate. Plant water status was assessed from midday stem water potential (Ψs), MDS, daily trunk growth rate (TGR), leaf turgor potential Ψp, fruit water potential (Ψf), stomatal conductance (gs) and photosynthesis (Pn) and transpiration rates (E). Yield, pruning weights and reserve sugar concentration were also evaluated. Trees were drip irrigated in order to satisfy the maximum crop water requirements. Variations in MDS were compared with changes in Ψs and VPD10-15 in the three treatments at the end of fruit growth stage (stage III), kernel filling stage (stage IV) and postharvest (stage V). Our results highlighted that crop load affects almond tree water status. We observed a greater effect of crop load on MDS and TGR than on Ψs. In T0 trees, Ψs was 16% higher than in T50 and T100. MDS was 36% and 49% lower in the low (T50) and almost nil-cropping trees (T0) than in the high-cropping trees (T100). The slope of MDS vs VPD10-15 forced to the origin increased with crop load, suggesting that different relationships are needed to estimate tree water status. TGR was 33% higher in T0 than in the cropping trees. In the same way, the presence of fruits, as reflected by the source/sink relationship, increased gas exchange parameters. Also pruning weights reflected competition between fruits and shoots for photoassimilates. Nevertheless the reserve sugar concentration at the base of the main branches was unaffected by the crop load. All this implies that it is necessary to consider the crop load in irrigation scheduling based on MDS signal intensity.

  14. Atmospheric pressure loading parameters from very long baseline interferometry observations

    NASA Technical Reports Server (NTRS)

    Macmillan, D. S.; Gipson, John M.

    1994-01-01

    Atmospheric mass loading produces a primarily vertical displacement of the Earth's crust. This displacement is correlated with surface pressure and is large enough to be detected by very long baseline interferometry (VLBI) measurements. Using the measured surface pressure at VLBI stations, we have estimated the atmospheric loading term for each station location directly from VLBI data acquired from 1979 to 1992. Our estimates of the vertical sensitivity to change in pressure range from 0 to -0.6 mm/mbar depending on the station. These estimates agree with inverted barometer model calculations (Manabe et al., 1991; vanDam and Herring, 1994) of the vertical displacement sensitivity computed by convolving actual pressure distributions with loading Green's functions. The pressure sensitivity tends to be smaller for stations near the coast, which is consistent with the inverted barometer hypothesis. Applying this estimated pressure loading correction in standard VLBI geodetic analysis improves the repeatability of estimated lengths of 25 out of 37 baselines that were measured at least 50 times. In a root-sum-square (rss) sense, the improvement generally increases with baseline length at a rate of about 0.3 to 0.6 ppb depending on whether the baseline stations are close to the coast. For the 5998-km baseline from Westford, Massachusetts, to Wettzell, Germany, the rss improvement is about 3.6 mm out of 11.0 mm. The average rss reduction of the vertical scatter for inland stations ranges from 2.7 to 5.4 mm.

  15. Performance and Vibratory Loads Data From a Wind-Tunnel Test of a Model Helicopter Main-Rotor Blade With a Paddle-Type Tip

    NASA Technical Reports Server (NTRS)

    Yeager, William T., Jr.; Noonan, Kevin W.; Singleton, Jeffrey D.; Wilbur, Matthew L.; Mirick, Paul H.

    1997-01-01

    An investigation was conducted in the Langley Transonic Dynamics Tunnel to obtain data to permit evaluation of paddle-type tip technology for possible use in future U.S. advanced rotor designs. Data was obtained for both a baseline main-rotor blade and a main-rotor blade with a paddle-type tip. The baseline and paddle-type tip blades were compared with regard to rotor performance, oscillatory pitch-link loads, and 4-per-rev vertical fixed-system loads. Data was obtained in hover and forward flight over a nominal range of advance ratios from 0.15 to 0.425. Results indicate that the paddle-type tip offers no performance improvements in either hover or forward flight. Pitch-link oscillatory loads for the paddle-type tip are higher than for the baseline blade, whereas 4-per-rev vertical fixed-system loads are generally lower.

  16. A Method for Optimal Load Dispatch of a Multi-zone Power System with Zonal Exchange Constraints

    NASA Astrophysics Data System (ADS)

    Hazarika, Durlav; Das, Ranjay

    2018-04-01

    This paper presented a method for economic generation scheduling of a multi-zone power system having inter zonal operational constraints. For this purpose, the generator rescheduling for a multi area power system having inter zonal operational constraints has been represented as a two step optimal generation scheduling problem. At first, the optimal generation scheduling has been carried out for the zone having surplus or deficient generation with proper spinning reserve using co-ordination equation. The power exchange required for the deficit zones and zones having no generation are estimated based on load demand and generation for the zone. The incremental transmission loss formulas for the transmission lines participating in the power transfer process among the zones are formulated. Using these, incremental transmission loss expression in co-ordination equation, the optimal generation scheduling for the zonal exchange has been determined. Simulation is carried out on IEEE 118 bus test system to examine the applicability and validity of the method.

  17. The effect of split sleep schedules (6h-on/6h-off) on neurobehavioural performance, sleep and sleepiness.

    PubMed

    Short, Michelle A; Centofanti, Stephanie; Hilditch, Cassie; Banks, Siobhan; Lushington, Kurt; Dorrian, Jillian

    2016-05-01

    Shorter, more frequent rosters, such as 6h-on/6h-off split shifts, may offer promise to sleep, subjective sleepiness and performance by limiting shift length and by offering opportunities for all workers to obtain some sleep across the biological night. However, there exists a paucity of studies that have examined these shifts using objective measures of sleep and performance. The present study examined neurobehavioural performance, sleepiness and sleep during 6h-on/6h-off split sleep schedules. Sixteen healthy adults (6 males, 26.13 y ± 4.46) participated in a 9-day laboratory study that included two baseline nights (BL, 10h time in bed (TIB), 2200 h-0800 h), 4 days on one of two types of 6h-on/6h-off split sleep schedules with 5h TIB during each 'off' period (6h early: TIB 0300 h-0800 h and 1500 h-20000 h, or 6-h late: TIB 0900 h-1400 h and 2100 h-0200 h), and two recovery nights (10h TIB per night, 2200 h-0800 h). Participants received 10h TIB per 24h in total across both shift schedules. A neurobehavioural test bout was completed every 2 h during wake, which included the Psychomotor Vigilance Task (PVT) and the Karolinska Sleepiness Scale (KSS). Linear mixed effects models were used to assess the effect of day (BL, shift days 1-4), schedule (6h early, 6h late) and trial (numbers 1-6) on PVT lapses (operationalised as the number of reaction times >500 ms), PVT total lapse time, PVT fastest 10% of reaction times and KSS. Analyses were also conducted examining the effect of day and schedule on sleep variables. Overall, PVT lapses and total lapse time did not differ significantly between baseline and shift days, however, peak response speeds were significantly slower on the first shift day when compared to baseline, but only for those in the 6h-late condition. Circadian variations were apparent in performance outcomes, with individuals in the 6h-late condition demonstrated significantly more and longer lapses and slower peak reaction times at the end of their night shift (0730 h) than at any other time during their shifts. In the 6h-early condition, only response speed significantly differed across trials, with slower response speeds occurring at trial 1 (0930 h) than in trials 3 (1330 h) or 4 (2130 h). While subjective sleepiness was higher on shift days than at baseline, sleepiness did not accumulate across days. Total sleep was reduced across split sleep schedules compared to baseline. Overall, these results show that while there was not a cumulative cost to performance across days of splitting sleep, participants obtained less sleep and reported lowered alertness on shift days. Tests near the circadian nadir showed higher sleepiness and increased performance deficits. While this schedule did not produce cumulative impairment, the performance deficits witnessed during the biological night are still of operational concern for industry and workers alike. Crown Copyright © 2015. Published by Elsevier Ltd. All rights reserved.

  18. 48 CFR 334.202 - Integrated Baseline Reviews (IBRs).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... rationale for a pre-award IBR, including an assessment of the impact on the source selection schedule and... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Integrated Baseline Reviews (IBRs). 334.202 Section 334.202 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES...

  19. 48 CFR 334.202 - Integrated Baseline Reviews (IBRs).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... rationale for a pre-award IBR, including an assessment of the impact on the source selection schedule and... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Integrated Baseline Reviews (IBRs). 334.202 Section 334.202 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES...

  20. 48 CFR 334.202 - Integrated Baseline Reviews (IBRs).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... rationale for a pre-award IBR, including an assessment of the impact on the source selection schedule and... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Integrated Baseline Reviews (IBRs). 334.202 Section 334.202 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES...

  1. 48 CFR 334.202 - Integrated Baseline Reviews (IBRs).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... rationale for a pre-award IBR, including an assessment of the impact on the source selection schedule and... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Integrated Baseline Reviews (IBRs). 334.202 Section 334.202 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES...

  2. 48 CFR 334.202 - Integrated Baseline Reviews (IBRs).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... rationale for a pre-award IBR, including an assessment of the impact on the source selection schedule and... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Integrated Baseline Reviews (IBRs). 334.202 Section 334.202 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES...

  3. Improving Hospital-wide Patient Scheduling Decisions by Clinical Pathway Mining.

    PubMed

    Gartner, Daniel; Arnolds, Ines V; Nickel, Stefan

    2015-01-01

    Recent research has highlighted the need for solving hospital-wide patient scheduling problems. Inpatient scheduling, patient activities have to be scheduled on scarce hospital resources such that temporal relations between activities (e.g. for recovery times) are ensured. Common objectives are, among others, the minimization of the length of stay (LOS). In this paper, we consider a hospital-wide patient scheduling problem with LOS minimization based on uncertain clinical pathways. We approach the problem in three stages: First, we learn most likely clinical pathways using a sequential pattern mining approach. Second, we provide a mathematical model for patient scheduling and finally, we combine the two approaches. In an experimental study carried out using real-world data, we show that our approach outperforms baseline approaches on two metrics.

  4. Effects of Fixed-Time Reinforcement Delivered by Teachers for Reducing Problem Behavior in Special Education Classrooms

    ERIC Educational Resources Information Center

    Tomlin, Michelle; Reed, Phil

    2012-01-01

    The effects of fixed-time (FT) reinforcement schedules on the disruptive behavior of 4 students in special education classrooms were studied. Attention provided on FT schedules in the context of a multiple-baseline design across participants substantially decreased all students' challenging behavior. Disruptive behavior was maintained at levels…

  5. Treatment for Acquired Apraxia of Speech: Examination of Treatment Intensity and Practice Schedule

    ERIC Educational Resources Information Center

    Wambaugh, Julie L.; Nessler, Christina; Cameron, Rosalea; Mauszycki, Shannon C.

    2013-01-01

    Purpose: The authors designed this investigation to extend the development of a treatment for acquired apraxia of speech (AOS)--sound production treatment (SPT)--by examining the effects of 2 treatment intensities and 2 schedules of practice. Method: The authors used a multiple baseline design across participants and behaviors with 4 speakers with…

  6. Charge scheduling of an energy storage system under time-of-use pricing and a demand charge.

    PubMed

    Yoon, Yourim; Kim, Yong-Hyuk

    2014-01-01

    A real-coded genetic algorithm is used to schedule the charging of an energy storage system (ESS), operated in tandem with renewable power by an electricity consumer who is subject to time-of-use pricing and a demand charge. Simulations based on load and generation profiles of typical residential customers show that an ESS scheduled by our algorithm can reduce electricity costs by approximately 17%, compared to a system without an ESS and by 8% compared to a scheduling algorithm based on net power.

  7. Charge Scheduling of an Energy Storage System under Time-of-Use Pricing and a Demand Charge

    PubMed Central

    Yoon, Yourim

    2014-01-01

    A real-coded genetic algorithm is used to schedule the charging of an energy storage system (ESS), operated in tandem with renewable power by an electricity consumer who is subject to time-of-use pricing and a demand charge. Simulations based on load and generation profiles of typical residential customers show that an ESS scheduled by our algorithm can reduce electricity costs by approximately 17%, compared to a system without an ESS and by 8% compared to a scheduling algorithm based on net power. PMID:25197720

  8. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2013-04

    DOT National Transportation Integrated Search

    2013-04-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  9. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2014-03

    DOT National Transportation Integrated Search

    2014-03-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  10. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2013-07

    DOT National Transportation Integrated Search

    2013-07-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  11. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2013-10

    DOT National Transportation Integrated Search

    2013-10-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  12. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2012-07

    DOT National Transportation Integrated Search

    2012-07-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  13. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2011-03

    DOT National Transportation Integrated Search

    2011-03-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  14. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2011-07

    DOT National Transportation Integrated Search

    2011-07-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  15. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2012-02

    DOT National Transportation Integrated Search

    2012-02-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  16. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2011-04

    DOT National Transportation Integrated Search

    2011-04-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  17. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2012-03

    DOT National Transportation Integrated Search

    2012-03-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  18. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2006-12

    DOT National Transportation Integrated Search

    2006-12-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  19. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2009-02

    DOT National Transportation Integrated Search

    2009-02-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  20. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2011-05

    DOT National Transportation Integrated Search

    2011-05-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  1. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2014-06

    DOT National Transportation Integrated Search

    2014-06-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  2. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2013-09

    DOT National Transportation Integrated Search

    2013-09-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  3. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2010-03

    DOT National Transportation Integrated Search

    2010-03-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  4. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2012-12

    DOT National Transportation Integrated Search

    2012-12-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  5. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2011-06

    DOT National Transportation Integrated Search

    2011-06-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  6. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2009-07

    DOT National Transportation Integrated Search

    2009-07-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  7. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2009-08

    DOT National Transportation Integrated Search

    2009-08-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  8. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2014-02

    DOT National Transportation Integrated Search

    2014-02-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  9. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2013-05

    DOT National Transportation Integrated Search

    2013-05-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  10. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2013-03

    DOT National Transportation Integrated Search

    2013-03-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  11. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2009-01

    DOT National Transportation Integrated Search

    2009-01-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  12. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2008-12

    DOT National Transportation Integrated Search

    2008-12-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  13. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2010-01

    DOT National Transportation Integrated Search

    2010-01-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  14. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2010-10

    DOT National Transportation Integrated Search

    2010-10-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  15. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2011-02

    DOT National Transportation Integrated Search

    2011-02-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  16. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2005-12

    DOT National Transportation Integrated Search

    2005-12-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  17. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2011-01

    DOT National Transportation Integrated Search

    2011-01-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  18. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2011-12

    DOT National Transportation Integrated Search

    2011-12-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  19. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2010-12

    DOT National Transportation Integrated Search

    2010-12-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  20. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2009-10

    DOT National Transportation Integrated Search

    2009-10-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  1. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2010-02

    DOT National Transportation Integrated Search

    2010-02-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  2. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2012-06

    DOT National Transportation Integrated Search

    2012-06-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  3. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2011-08

    DOT National Transportation Integrated Search

    2011-08-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  4. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2012-10

    DOT National Transportation Integrated Search

    2012-10-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  5. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2014-04

    DOT National Transportation Integrated Search

    2014-04-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  6. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2013-08

    DOT National Transportation Integrated Search

    2013-08-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  7. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2009-12

    DOT National Transportation Integrated Search

    2009-12-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  8. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2012-08

    DOT National Transportation Integrated Search

    2012-08-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  9. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2010-08

    DOT National Transportation Integrated Search

    2010-08-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  10. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2010-06

    DOT National Transportation Integrated Search

    2010-06-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  11. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2011-10

    DOT National Transportation Integrated Search

    2011-10-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  12. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2012-04

    DOT National Transportation Integrated Search

    2012-04-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  13. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2010-04

    DOT National Transportation Integrated Search

    2010-04-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  14. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2010-05

    DOT National Transportation Integrated Search

    2010-05-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  15. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2012-11

    DOT National Transportation Integrated Search

    2012-11-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  16. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2007-12

    DOT National Transportation Integrated Search

    2007-12-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  17. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2009-04

    DOT National Transportation Integrated Search

    2009-04-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  18. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2011-09

    DOT National Transportation Integrated Search

    2011-09-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  19. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2009-06

    DOT National Transportation Integrated Search

    2009-06-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  20. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2009-05

    DOT National Transportation Integrated Search

    2009-05-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  1. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2014-01

    DOT National Transportation Integrated Search

    2014-01-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  2. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2013-02

    DOT National Transportation Integrated Search

    2013-02-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  3. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2012-01

    DOT National Transportation Integrated Search

    2012-01-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  4. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2010-07

    DOT National Transportation Integrated Search

    2010-07-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  5. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2013-12

    DOT National Transportation Integrated Search

    2013-12-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  6. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2013-01

    DOT National Transportation Integrated Search

    2013-01-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  7. Data Bank 20 - Form 41 Schedule T-1 (T-100) - Monthly US Air Carrier Capacity and Traffic Data : [2009-03

    DOT National Transportation Integrated Search

    2009-03-01

    This CD presents traffic data for all certificated and commuter air carriers, both scheduled and nonscheduled. Data includes passenger-miles, ton-miles, seat-miles, load factors, hours, enplanements, and performance. Data are available since 1974.

  8. Baseline Preferences for Daily, Event-Driven, or Periodic HIV Pre-Exposure Prophylaxis among Gay and Bisexual Men in the PRELUDE Demonstration Project.

    PubMed

    Vaccher, Stefanie J; Gianacas, Christopher; Templeton, David J; Poynten, Isobel M; Haire, Bridget G; Ooi, Catriona; Foster, Rosalind; McNulty, Anna; Grulich, Andrew E; Zablotska, Iryna B

    2017-01-01

    The effectiveness of daily pre-exposure prophylaxis (PrEP) is well established. However, there has been increasing interest in non-daily dosing schedules among gay and bisexual men (GBM). This paper explores preferences for PrEP dosing schedules among GBM at baseline in the PRELUDE demonstration project. Individuals at high-risk of HIV were enrolled in a free PrEP demonstration project in New South Wales, Australia, between November 2014 and April 2016. At baseline, they completed an online survey containing detailed behavioural, demographic, and attitudinal questions, including their ideal way to take PrEP: daily (one pill taken every day), event-driven (pills taken only around specific risk events), or periodic (daily dosing during periods of increased risk). Overall, 315 GBM (98% of study sample) provided a preferred PrEP dosing schedule at baseline. One-third of GBM expressed a preference for non-daily PrEP dosing: 20% for event-driven PrEP, and 14% for periodic PrEP. Individuals with a trade/vocational qualification were more likely to prefer periodic to daily PrEP [adjusted odds ratio (aOR) = 4.58, 95% confidence intervals (95% CI): (1.68, 12.49)], compared to individuals whose highest level of education was high school. Having an HIV-positive main regular partner was associated with strong preference for daily, compared to event-driven PrEP [aOR = 0.20, 95% CI: (0.04, 0.87)]. Participants who rated themselves better at taking medications were more likely to prefer daily over periodic PrEP [aOR = 0.39, 95% CI: (0.20, 0.76)]. Individuals' preferences for PrEP schedules are associated with demographic and behavioural factors that may impact on their ability to access health services and information about PrEP and patterns of HIV risk. At the time of data collection, there were limited data available about the efficacy of non-daily PrEP schedules, and clinicians only recommended daily PrEP to study participants. Further research investigating how behaviours and PrEP preferences change correspondingly over time is needed. ClinicalTrials.gov NCT02206555. Registered 28 July 2014.

  9. Payload crew training scheduler (PACTS) user's manual

    NASA Technical Reports Server (NTRS)

    Shipman, D. L.

    1980-01-01

    The operation of the payload specialist training scheduler (PACTS) is discussed in this user's manual which is used to schedule payload specialists for mission training on the Spacelab experiments. The PACTS program is a fully automated interactive, computerized scheduling program equipped with tutorial displays. The tutorial displays are sufficiently detailed for use by a program analyst having no computer experience. The PACTS program is designed to operate on the UNIVAC 1108 computer system, and has the capability to load output into a PDP 11/45 Interactive Graphics Display System for printing schedules. The program has the capacity to handle up to three overlapping Spacelab missions.

  10. Future Air Traffic Growth and Schedule Model, Supplement

    NASA Technical Reports Server (NTRS)

    Kimmel, William M. (Technical Monitor); Smith, Jeremy C.; Dollyhigh, Samuel M.

    2004-01-01

    The Future Air Traffic Growth and Schedule Model was developed as an implementation of the Fratar algorithm to project future traffic flow between airports in a system and of then scheduling the additional flights to reflect current passenger time-of-travel preferences. The methodology produces an unconstrained future schedule from a current (or baseline) schedule and the airport operations growth rates. As an example of the use of the model, future schedules are projected for 2010 and 2022 for all flights arriving at, departing from, or flying between all continental United States airports that had commercial scheduled service for May 17, 2002. Inter-continental US traffic and airports are included and the traffic is also grown with the Fratar methodology to account for their arrivals and departures to the continental US airports. Input data sets derived from the Official Airline Guide (OAG) data and FAA Terminal Area Forecast (TAF) are included in the examples of the computer code execution.

  11. 76 FR 21722 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... Notice of Cancellation of Reactive Power Rate Schedule. Filed Date: 04/07/2011. Accession Number...)(2)(iii): Revisions to the Tariff and OA re Emerg. Load Response Program ``Reporting'' to be... Reactive Rate Schedule Notice of Succession to be effective 3/9/2011. Filed Date: 04/07/2011. Accession...

  12. Study of Flexible Load Dispatch to Improve the Capacity of Wind Power Absorption

    NASA Astrophysics Data System (ADS)

    Yunlei, Yang; Shifeng, Zhang; Xiao, Chang; Da, Lei; Min, Zhang; Jinhao, Wang; Shengwen, Li; Huipeng, Li

    2017-05-01

    The dispatch method which track the trend of load demand by arranging the generation scheme of controllable hydro or thermal units faces great difficulties and challenges. With the increase of renewable energy sources such as wind power and photovoltaic power introduced to grid, system has to arrange much more spinning reserve units to compensate the unbalanced power. How to exploit the peak-shaving potential of flexible load which can be shifted with time or storage energy has become many scholars’ research direction. However, the modelling of different kinds of load and control strategy is considerably difficult, this paper choose the Air Conditioner with compressor which can storage energy in fact to study. The equivalent thermal parameters of Air Conditioner has been established. And with the use of “loop control” strategies, we can predict the regulated power of Air Conditioner. Then we established the Gen-Load optimal scheduling model including flexible load based on traditional optimal scheduling model. At last, an improved IEEE-30 case is used to verify. The result of simulation shows that flexible load can fast-track renewable power changes. More than that, with flexible load and reasonable incentive method to consumers, the operating cost of the system can be greatly cut down.

  13. Analysis of tasks for dynamic man/machine load balancing in advanced helicopters

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jorgensen, C.C.

    1987-10-01

    This report considers task allocation requirements imposed by advanced helicopter designs incorporating mixes of human pilots and intelligent machines. Specifically, it develops an analogy between load balancing using distributed non-homogeneous multiprocessors and human team functions. A taxonomy is presented which can be used to identify task combinations likely to cause overload for dynamic scheduling and process allocation mechanisms. Designer criteria are given for function decomposition, separation of control from data, and communication handling for dynamic tasks. Possible effects of n-p complete scheduling problems are noted and a class of combinatorial optimization methods are examined.

  14. 76 FR 61351 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ... Trading LLC submits tariff filing per 35.1: DB Energy Trading LLC Rate Schedule FERC No. 1 Baseline Filing... Energy FERC Electric Tariff, Volume No. 1 Baseline to be effective 9/23/2011. Filed Date: 09/23/2011... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings 1 Take notice...

  15. Astronaut Office Scheduling System Software

    NASA Technical Reports Server (NTRS)

    Brown, Estevancio

    2010-01-01

    AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

  16. Cyclic loading increases friction and changes cartilage surface integrity in lubricin-mutant mouse knees

    PubMed Central

    Drewniak, Elizabeth I; Jay, Gregory D; Fleming, Braden C; Zhang, Ling; Warman, Matthew L; Crisco, Joseph J

    2012-01-01

    Objective To investigate the effects of lubricin gene dosage and cyclic loading on whole joint coefficient of friction and articular cartilage surface integrity in mouse knee joints. Methods Joints from mice with 2 (Prg4+/+), 1 (Prg4+/−), or no (Prg4−/−) functioning lubricin alleles were subjected to 26 hours of cyclic loading using a custom-built pendulum. Coefficient of friction values were measured at multiple time points. Contralateral control joints were left unloaded. Following testing, joints were examined for histologic evidence of damage and cell viability. Results At baseline, the coefficient of friction values in Prg4−/− mice were significantly higher than those in Prg4+/+ and Prg4+/− mice (P < 0.001). Cyclic loading continuously increased the coefficient of friction in Prg4−/− mouse joints. In contrast, Prg4+/− and Prg4+/+ mouse joints had no coefficient of friction increases during the first 4 hours of loading. After 26 hours of loading, joints from all genotypes had increased coefficient of friction values compared to baseline and unloaded controls. Significantly greater increases occurred in Prg4−/− and Prg4+/− mouse joints compared to Prg4+/+ mouse joints. The coefficient of friction values were not significantly associated with histologic evidence of damage or loss of cell viability. Conclusion Our findings indicate that mice lacking lubricin have increased baseline coefficient of friction values and are not protected against further increases caused by loading. Prg4+/− mice are indistinguishable from Prg4+/+ mice at baseline, but have significantly greater coefficient of friction values following 26 hours of loading. Lubricin dosage affects joint properties during loading, and may have clinical implications in patients for whom injury or illness alters lubricin abundance. PMID:21905020

  17. Quarterly Update: July-September 1990

    DTIC Science & Technology

    1990-09-01

    drafted a report that defines the process and the products of a feature oriented domain analysis ( FODA ) and provides a sample do- main analysis . This...receive ............... training to offer assessment services commercially. This section provides NASA adopted the rate monotonic scheduling analysis ...that the rate monotonic scheduling analysis approach will be the JulySeptember 1990 baseline methodology for its hard real-time operating system

  18. Residential Consumer-Centric Demand-Side Management Based on Energy Disaggregation-Piloting Constrained Swarm Intelligence: Towards Edge Computing.

    PubMed

    Lin, Yu-Hsiu; Hu, Yu-Chen

    2018-04-27

    The emergence of smart Internet of Things (IoT) devices has highly favored the realization of smart homes in a down-stream sector of a smart grid. The underlying objective of Demand Response (DR) schemes is to actively engage customers to modify their energy consumption on domestic appliances in response to pricing signals. Domestic appliance scheduling is widely accepted as an effective mechanism to manage domestic energy consumption intelligently. Besides, to residential customers for DR implementation, maintaining a balance between energy consumption cost and users’ comfort satisfaction is a challenge. Hence, in this paper, a constrained Particle Swarm Optimization (PSO)-based residential consumer-centric load-scheduling method is proposed. The method can be further featured with edge computing. In contrast with cloud computing, edge computing—a method of optimizing cloud computing technologies by driving computing capabilities at the IoT edge of the Internet as one of the emerging trends in engineering technology—addresses bandwidth-intensive contents and latency-sensitive applications required among sensors and central data centers through data analytics at or near the source of data. A non-intrusive load-monitoring technique proposed previously is utilized to automatic determination of physical characteristics of power-intensive home appliances from users’ life patterns. The swarm intelligence, constrained PSO, is used to minimize the energy consumption cost while considering users’ comfort satisfaction for DR implementation. The residential consumer-centric load-scheduling method proposed in this paper is evaluated under real-time pricing with inclining block rates and is demonstrated in a case study. The experimentation reported in this paper shows the proposed residential consumer-centric load-scheduling method can re-shape loads by home appliances in response to DR signals. Moreover, a phenomenal reduction in peak power consumption is achieved by 13.97%.

  19. Immunogenicity of a three dose and five dose oral human rotavirus vaccine (RIX4414) schedule in south Indian infants.

    PubMed

    Kompithra, Rajeev Zachariah; Paul, Anu; Manoharan, Divya; Babji, Sudhir; Sarkar, Rajiv; Mathew, Leni G; Kang, Gagandeep

    2014-08-11

    This study was undertaken to compare the immunogenicity of a three dose and five dose schedule of an oral live-attenuated human rotavirus vaccine, Rotarix in south Indian infants. Healthy infants (N=90), six to seven weeks of age were enrolled to receive three doses (n=45) or five doses of Rotarix vaccine (n=45) along with other scheduled vaccines, each dose separated by a four week interval. Blood samples were taken before vaccination and one month post-dose three in the Rotarix three dose group and one month post-dose five in the Rotarix five dose group; all were tested for anti-rotavirus IgA by an antibody sandwich enzyme immunoassay. At baseline, >50% of infants had >20 units of anti-rotavirus IgA. The seroconversion rates after three and five doses were low and not significantly different in the two groups. However, among vaccine responders, children seropositive at baseline showed a much greater absolute increase in IgA antibody levels than children seronegative at baseline. Rotarix vaccine showed low immunogenicity in south Indian children and increasing the number of doses did not increase the proportion of infants seroconverting after vaccination. Copyright © 2014. Published by Elsevier Ltd.

  20. Comparing fixed-amount and progressive-amount DRO Schedules for tic suppression in youth with chronic tic disorders.

    PubMed

    Capriotti, Matthew R; Turkel, Jennifer E; Johnson, Rachel A; Espil, Flint M; Woods, Douglas W

    2017-01-01

    Chronic tic disorders (CTDs) involve motor and/or vocal tics that often cause substantial distress and impairment. Differential reinforcement of other behavior (DRO) schedules of reinforcement produce robust, but incomplete, reductions in tic frequency in youth with CTDs; however, a more robust reduction may be needed to affect durable clinical change. Standard, fixed-amount DRO schedules have not commonly yielded such reductions, so we evaluated a novel, progressive-amount DRO schedule, based on its ability to facilitate sustained abstinence from functionally similar behaviors. Five youth with CTDs were exposed to periods of baseline, fixed-amount DRO (DRO-F), and progressive-amount DRO (DRO-P). Both DRO schedules produced decreases in tic rate and increases in intertic interval duration, but no systematic differences were seen between the two schedules on any dimension of tic occurrence. The DRO-F schedule was generally preferred to the DRO-P schedule. Possible procedural improvements and other future directions are discussed. © 2016 Society for the Experimental Analysis of Behavior.

  1. Changed nursing scheduling for improved safety culture and working conditions - patients' and nurses' perspectives.

    PubMed

    Kullberg, Anna; Bergenmar, Mia; Sharp, Lena

    2016-05-01

    To evaluate fixed scheduling compared with self-scheduling for nursing staff in oncological inpatient care with regard to patient and staff outcomes. Various scheduling models have been tested to attract and retain nursing staff. Little is known about how these schedules affect staff and patients. Fixed scheduling and self-scheduling have been studied to a small extent, solely from a staff perspective. We implemented fixed scheduling on two of four oncological inpatient wards. Two wards kept self-scheduling. Through a quasi-experimental design, baseline and follow-up measurements were collected among staff and patients. The Safety Attitudes Questionnaire was used among staff, as well as study-specific questions for patients and staff. Fixed scheduling was associated with less overtime and fewer possibilities to change shifts. Self-scheduling was associated with more requests from management for short notice shift changes. The type of scheduling did not affect patient-reported outcomes. Fixed scheduling should be considered in order to lower overtime. Further research is necessary and should explore patient outcomes to a greater extent. Scheduling is a core task for nurse managers. Our study suggests fixed scheduling as a strategy for managers to improve the effective use of resources and safety. © 2016 John Wiley & Sons Ltd.

  2. Diagnosing causes of increased NO{sub x} at Potomac River Unit 4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D`Agostini, M.; Levy, E.; Blankenship, D.

    1996-12-31

    Potomac River Unit 4, a 108 MW unit, has a corner-fired boiler with conventional burners. Through the use of combustion optimization techniques, the NO{sub x} emissions had been reduced from baseline levels of 0.6 lb/MBtu to values below 0.45 lb/MBtu over the load range, and had been routinely dispatched at this reduced emissions level for extended periods of operation. After a scheduled outage in Fall 1995 for boiler maintenance, windbox modifications and a superheater replacement, the unit was returned to service, and it was found that the full-load NO{sub x} level had increased by approximately 0.1 lb/MBtu. A week ofmore » tests was performed and pre- and post-outage data analyzed to determine the factors contributing to the increase in NO{sub x} emissions. The principal cause was found to be a reduction in the amount of boiler air in-leakage arising from boiler casing repairs, and leading to higher air-to-fuel ratios in the furnace. Other, secondary, causes were also determined. Results from the analysis indicate the windbox modifications were actually effective in reducing NO{sub x}, although the benefits were obscured due to the intervening circumstances. This paper describes the diagnostic process which was followed and discusses the findings from the investigation.« less

  3. Apolipoprotein E genotype does not moderate the associations of depressive symptoms, neuroticism and allostatic load with cognitive ability and cognitive aging in the Lothian Birth Cohort 1936.

    PubMed

    Crook, Zander; Booth, Tom; Cox, Simon R; Corley, Janie; Dykiert, Dominika; Redmond, Paul; Pattie, Alison; Taylor, Adele M; Harris, Sarah E; Starr, John M; Deary, Ian J

    2018-01-01

    In this replication-and-extension study, we tested whether depressive symptoms, neuroticism, and allostatic load (multisystem physiological dysregulation) were related to lower baseline cognitive ability and greater subsequent cognitive decline in older adults, and whether these relationships were moderated by the E4 allele of the apolipoprotein E (APOE) gene. We also tested whether allostatic load mediated the relationships between neuroticism and cognitive outcomes. We used data from the Lothian Birth Cohort 1936 (n at Waves 1-3: 1,028 [M age = 69.5 y]; 820 [M duration since Wave 1 = 2.98 y]; 659 [M duration since Wave 1 = 6.74 y]). We fitted latent growth curve models of general cognitive ability (modeled using five cognitive tests) with groups of APOE E4 non-carriers and carriers. In separate models, depressive symptoms, neuroticism, and allostatic load predicted baseline cognitive ability and subsequent cognitive decline. In addition, models tested whether allostatic load mediated relationships between neuroticism and cognitive outcomes. Baseline cognitive ability had small-to-moderate negative associations with depressive symptoms (β range = -0.20 to -0.17), neuroticism (β range = -0.27 to -0.23), and allostatic load (β range = -0.11 to 0.09). Greater cognitive decline was linked to baseline allostatic load (β range = -0.98 to -0.83) and depressive symptoms (β range = -1.00 to -0.88). However, APOE E4 allele possession did not moderate the relationships of depressive symptoms, neuroticism and allostatic load with cognitive ability and cognitive decline. Additionally, the associations of neuroticism with cognitive ability and cognitive decline were not mediated through allostatic load. Our results suggest that APOE E4 status does not moderate the relationships of depressive symptoms, neuroticism, and allostatic load with cognitive ability and cognitive decline in healthy older adults. The most notable positive finding in the current research was the strong association between allostatic load and cognitive decline.

  4. Atmospheric pressure loading effects on Global Positioning System coordinate determinations

    NASA Technical Reports Server (NTRS)

    Vandam, Tonie M.; Blewitt, Geoffrey; Heflin, Michael B.

    1994-01-01

    Earth deformation signals caused by atmospheric pressure loading are detected in vertical position estimates at Global Positioning System (GPS) stations. Surface displacements due to changes in atmospheric pressure account for up to 24% of the total variance in the GPS height estimates. The detected loading signals are larger at higher latitudes where pressure variations are greatest; the largest effect is observed at Fairbanks, Alaska (latitude 65 deg), with a signal root mean square (RMS) of 5 mm. Out of 19 continuously operating GPS sites (with a mean of 281 daily solutions per site), 18 show a positive correlation between the GPS vertical estimates and the modeled loading displacements. Accounting for loading reduces the variance of the vertical station positions on 12 of the 19 sites investigated. Removing the modeled pressure loading from GPS determinations of baseline length for baselines longer than 6000 km reduces the variance on 73 of the 117 baselines investigated. The slight increase in variance for some of the sites and baselines is consistent with expected statistical fluctuations. The results from most stations are consistent with approximately 65% of the modeled pressure load being found in the GPS vertical position measurements. Removing an annual signal from both the measured heights and the modeled load time series leaves this value unchanged. The source of the remaining discrepancy between the modeled and observed loading signal may be the result of (1) anisotropic effects in the Earth's loading response, (2) errors in GPS estimates of tropospheric delay, (3) errors in the surface pressure data, or (4) annual signals in the time series of loading and station heights. In addition, we find that using site dependent coefficients, determined by fitting local pressure to the modeled radial displacements, reduces the variance of the measured station heights as well as or better than using the global convolution sum.

  5. Online Optimization Method for Operation of Generators in a Micro Grid

    NASA Astrophysics Data System (ADS)

    Hayashi, Yasuhiro; Miyamoto, Hideki; Matsuki, Junya; Iizuka, Toshio; Azuma, Hitoshi

    Recently a lot of studies and developments about distributed generator such as photovoltaic generation system, wind turbine generation system and fuel cell have been performed under the background of the global environment issues and deregulation of the electricity market, and the technique of these distributed generators have progressed. Especially, micro grid which consists of several distributed generators, loads and storage battery is expected as one of the new operation system of distributed generator. However, since precipitous load fluctuation occurs in micro grid for the reason of its smaller capacity compared with conventional power system, high-accuracy load forecasting and control scheme to balance of supply and demand are needed. Namely, it is necessary to improve the precision of operation in micro grid by observing load fluctuation and correcting start-stop schedule and output of generators online. But it is not easy to determine the operation schedule of each generator in short time, because the problem to determine start-up, shut-down and output of each generator in micro grid is a mixed integer programming problem. In this paper, the authors propose an online optimization method for the optimal operation schedule of generators in micro grid. The proposed method is based on enumeration method and particle swarm optimization (PSO). In the proposed method, after picking up all unit commitment patterns of each generators satisfied with minimum up time and minimum down time constraint by using enumeration method, optimal schedule and output of generators are determined under the other operational constraints by using PSO. Numerical simulation is carried out for a micro grid model with five generators and photovoltaic generation system in order to examine the validity of the proposed method.

  6. A work-for-food enrichment program increases exploration and decreases stereotypies in four species of bears.

    PubMed

    Wagman, Jason D; Lukas, Kristen E; Dennis, Patricia M; Willis, Mark A; Carroscia, Joe; Gindlesperger, Curt; Schook, Mandi W

    2018-01-01

    Zoo-housed bears are prone to exhibiting stereotypic behaviors, generally considered indicators of negative welfare. We explored the effects of a variable-time feeding enrichment schedule on behavioral indicators of welfare in four bear species at Cleveland Metroparks Zoo. We distributed the diets of eight bears in one of five enrichment items, for two consecutive days each, and monitored behavior throughout the day. In Experiment 1, we compared variable-time to fixed-time presentation of enrichment over two, 10-day periods. Overall, bears performed more exploratory behavior when enriched (p < 0.0001). Furthermore, variable-time enrichment was associated with a greater increase in exploratory behavior than fixed-time enrichment when compared to baseline (p < 0.001). Both fixed-time (p unadjusted <0.05, p adjusted = 0.07) and variable-schedule (p unadjusted <0.05, p adjusted = 0.09) enrichment were also associated with similar decreases in abnormal behavior compared to baseline. For Experiment 2, we tested habituation to enrichment over 30 days using multiple items and a semi-variable presentation schedule. Again during the enrichment period, bears exhibited increased exploratory behavior (p < 0.0001) and decreased abnormal behaviors compared to baseline (p unadjusted = 0.05, p adjusted = 0.09). We observed no habituation during the 30-day sustained enrichment period for these behaviors. Collectively, these results suggest that daily, variable-schedule feeding enrichment, with intermittent presentation of unique enrichment items, increases behavioral indicators of positive welfare and decreases behavioral indicators of negative welfare. © 2018 Wiley Periodicals, Inc.

  7. Emergency response nurse scheduling with medical support robot by multi-agent and fuzzy technique.

    PubMed

    Kono, Shinya; Kitamura, Akira

    2015-08-01

    In this paper, a new co-operative re-scheduling method corresponding the medical support tasks that the time of occurrence can not be predicted is described, assuming robot can co-operate medical activities with the nurse. Here, Multi-Agent-System (MAS) is used for the co-operative re-scheduling, in which Fuzzy-Contract-Net (FCN) is applied to the robots task assignment for the emergency tasks. As the simulation results, it is confirmed that the re-scheduling results by the proposed method can keep the patients satisfaction and decrease the work load of the nurse.

  8. An operation support expert system based on on-line dynamics simulation and fuzzy reasoning for startup schedule optimization in fossil power plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matsumoto, H.; Eki, Y.; Kaji, A.

    1993-12-01

    An expert system which can support operators of fossil power plants in creating the optimum startup schedule and executing it accurately is described. The optimum turbine speed-up and load-up pattern is obtained through an iterative manner which is based on fuzzy resonating using quantitative calculations as plant dynamics models and qualitative knowledge as schedule optimization rules with fuzziness. The rules represent relationships between stress margins and modification rates of the schedule parameters. Simulations analysis proves that the system provides quick and accurate plant startups.

  9. Core compressor exit stage study. Volume 1: Blading design. [turbofan engines

    NASA Technical Reports Server (NTRS)

    Wisler, D. C.

    1977-01-01

    A baseline compressor test stage was designed as well as a candidate rotor and two candidate stators that have the potential of reducing endwall losses relative to the baseline stage. These test stages are typical of those required in the rear stages of advanced, highly-loaded core compressors. The baseline Stage A is a low-speed model of Stage 7 of the 10 stage AMAC compressor. Candidate Rotor B uses a type of meanline in the tip region that unloads the leading edge and loads the trailing edge relative to the baseline Rotor A design. Candidate Stator B embodies twist gradients in the endwall region. Candidate Stator C embodies airfoil sections near the endwalls that have reduced trailing edge loading relative to Stator A. Tests will be conducted using four identical stages of blading so that the designs described will operate in a true multistage environment.

  10. Research on Power System Scheduling Improving Wind Power Accommodation Considering Thermal Energy Storage and Flexible Load

    NASA Astrophysics Data System (ADS)

    Zou, Chenlu; Cui, Xue; Wang, Heng; Zhou, Bin; Liu, Yang

    2018-01-01

    In the case of rapid development of wind power and heavy wind curtailment, the study of wind power accommodation of combined heat and power system has become the focus of attention. A two-stage scheduling model contains of wind power, thermal energy storage, CHP unit and flexible load were constructed. This model with the objective function of minimizing wind curtailment and the operation cost of units while taking into account of the total coal consumption of units, constraint of thermal energy storage and electricity-heat characteristic of CHP. This paper uses MICA to solve the problem of too many constraints and make the solution more feasible. A numerical example showed that the two stage decision scheduling model can consume more wind power, and it could provide a reference for combined heat and power system short-term operation

  11. Wind-tunnel evaluation of an advanced main-rotor blade design for a utility-class helicopter

    NASA Technical Reports Server (NTRS)

    Yeager, William T., Jr.; Mantay, Wayne R.; Wilbur, Matthew L.; Cramer, Robert G., Jr.; Singleton, Jeffrey D.

    1987-01-01

    An investigation was conducted in the Langley Transonic Dynamics Tunnel to evaluate differences between an existing utility-class main-rotor blade and an advanced-design main-rotor blade. The two rotor blade designs were compared with regard to rotor performance oscillatory pitch-link loads, and 4-per-rev vertical fixed-system loads. Tests were conducted in hover and over a range of simulated full-scale gross weights and density altitude conditions at advance ratios from 0.15 to 0.40. Results indicate that the advanced blade design offers performance improvements over the baseline blade in both hover and forward flight. Pitch-link oscillatory loads for the baseline rotor were more sensitive to the test conditions than those of the advanced rotor. The 4-per-rev vertical fixed-system load produced by the advanced blade was larger than that produced by the baseline blade at all test conditions.

  12. Task 2 Report: Algorithm Development and Performance Analysis

    DTIC Science & Technology

    1993-07-01

    separated peaks ............................................. 39 7-16 Example ILGC data for schedule 3 phosphites showing an analysis method which integrates...more closely follows the baseline ................. 40 7-18 Example R.GC data for schedule 3 phosphites showing an analysis method resulting in unwanted...much of the ambiguity that can arise in GC/MS with trace environmental samples, for example. Correlated chromatography, on the other hand, separates the

  13. Teaching Community Skills to Two Young Children with Autism Using a Digital Self-Managed Activity Schedule

    ERIC Educational Resources Information Center

    Cheung, Yvonne; Schulze, Kimberly A.; Leaf, Justin B.; Rudrud, Eric

    2016-01-01

    The current study investigated the efficacy of a self-managed activity schedule to teach 2 participants how to effectively order food items from a local community bakery. 2 participants who were on the autism spectrum were taught to follow a task analysis that was displayed on an iPhone. We used a multiple baseline design across participants to…

  14. Effective Schedule and Cost Management as a Product Development Lead

    NASA Technical Reports Server (NTRS)

    Simmons, Cynthia

    2015-01-01

    The presentation will be given at the 26th Annual Thermal Fluids Analysis Workshop (TFAWS 2015) hosted by the Goddard SpaceFlight Center (GSFC) Thermal Engineering Branch (Code 545). This course provides best practices, helpful tools and lessons learned for staying on plan and day-to-day management of Subsystem flight development after getting Project approval for your Subsystem schedule and budget baseline.

  15. Modified open-access scheduling for new patient evaluations at an academic chronic pain clinic increased patient access to care, but did not materially reduce their mean cancellation rate: A retrospective, observational study.

    PubMed

    Sivanesan, Eellan; Lubarsky, David A; Ranasinghe, Chaturani T; Sarantopoulos, Constantine D; Epstein, Richard H

    2017-09-01

    To determine if open-access scheduling would reduce the cancellation rate for new patient evaluations in a chronic pain clinic by at least 50%. Retrospective, observational study using electronic health records. Chronic pain clinic of an academic anesthesia department. All patients scheduled for evaluation or follow-up appointments in the chronic pain clinic between April 1, 2014, and December 31, 2015. Open-access scheduling was instituted in April 2015 with appointments offered on a date of the patient's choosing ≥1 business day after calling, with no limit on the daily number of new patients. Mean cancellation rates for new patients were compared between the 12-month baseline period prior to and for 7months after the change, following an intervening 2-month washout period. The method of batch means (by month) and the 2-sided Student t-test were used; P<0.01 required for significance. The new patient mean cancellation rate decreased from a baseline of 35.7% by 4.2% (95% confidence interval [CI] 1.4% to 6.9%; P=0.005); however, this failed to reach the 50% reduction target of 17.8%. Appointment lag time decreased by 4.7days (95% CI 2.3 to 7.0days, P<0.001) from 14.1days to 9.4days in the new patient group. More new patients were seen within 1week compared to baseline (50.6% versus 19.1%; P<0.0001). The mean number of new patient visits per month increased from 158.5 to 225.0 (P=0.0004). The cancellation rate and appointment lag times did not decrease for established patient visits, as expected because open-access scheduling was not implemented for this group. Access to care for new chronic pain patients improved with modified open-access scheduling. However, their mean cancellation rate only decreased from 35.7% to 31.5%, making this a marginally effective strategy to reduce cancellations. Copyright © 2017 Elsevier Inc. All rights reserved.

  16. Design and Scheduling of Microgrids using Benders Decomposition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nagarajan, Adarsh; Ayyanar, Raja

    2016-11-21

    The distribution feeder laterals in a distribution feeder with relatively high PV generation as compared to the load can be operated as microgrids to achieve reliability, power quality and economic benefits. However, renewable resources are intermittent and stochastic in nature. A novel approach for sizing and scheduling an energy storage system and microturbine for reliable operation of microgrids is proposed. The size and schedule of an energy storage system and microturbine are determined using Benders' decomposition, considering PV generation as a stochastic resource.

  17. Modeling and distributed gain scheduling strategy for load frequency control in smart grids with communication topology changes.

    PubMed

    Liu, Shichao; Liu, Xiaoping P; El Saddik, Abdulmotaleb

    2014-03-01

    In this paper, we investigate the modeling and distributed control problems for the load frequency control (LFC) in a smart grid. In contrast with existing works, we consider more practical and real scenarios, where the communication topology of the smart grid changes because of either link failures or packet losses. These topology changes are modeled as a time-varying communication topology matrix. By using this matrix, a new closed-loop power system model is proposed to integrate the communication topology changes into the dynamics of a physical power system. The globally asymptotical stability of this closed-loop power system is analyzed. A distributed gain scheduling LFC strategy is proposed to compensate for the potential degradation of dynamic performance (mean square errors of state vectors) of the power system under communication topology changes. In comparison to conventional centralized control approaches, the proposed method can improve the robustness of the smart grid to the variation of the communication network as well as to reduce computation load. Simulation results show that the proposed distributed gain scheduling approach is capable to improve the robustness of the smart grid to communication topology changes. © 2013 ISA. Published by ISA. All rights reserved.

  18. Planning and Resource Management in an Intelligent Automated Power Management System

    NASA Technical Reports Server (NTRS)

    Morris, Robert A.

    1991-01-01

    Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

  19. Design of ProjectRun21: a 14-week prospective cohort study of the influence of running experience and running pace on running-related injury in half-marathoners.

    PubMed

    Damsted, Camma; Parner, Erik Thorlund; Sørensen, Henrik; Malisoux, Laurent; Nielsen, Rasmus Oestergaard

    2017-11-06

    Participation in half-marathon has been steeply increasing during the past decade. In line, a vast number of half-marathon running schedules has surfaced. Unfortunately, the injury incidence proportion for half-marathoners has been found to exceed 30% during 1-year follow-up. The majority of running-related injuries are suggested to develop as overuse injuries, which leads to injury if the cumulative training load over one or more training sessions exceeds the runners' load capacity for adaptive tissue repair. Owing to an increase of load capacity along with adaptive running training, the runners' running experience and pace abilities can be used as estimates for load capacity. Since no evidence-based knowledge exist of how to plan appropriate half-marathon running schedules considering the level of running experience and running pace, the aim of ProjectRun21 is to investigate the association between running experience or running pace and the risk of running-related injury. Healthy runners using Global Positioning System (GPS) watch between 18 and 65 years will be invited to participate in this 14-week prospective cohort study. Runners will be allowed to self-select one of three half-marathon running schedules developed for the study. Running data will be collected objectively by GPS. Injury will be based on the consensus-based time loss definition by Yamato et al.: "Running-related (training or competition) musculoskeletal pain in the lower limbs that causes a restriction on or stoppage of running (distance, speed, duration, or training) for at least 7 days or 3 consecutive scheduled training sessions, or that requires the runner to consult a physician or other health professional". Running experience and running pace will be included as primary exposures, while the exposure to running is pre-fixed in the running schedules and thereby conditioned by design. Time-to-event models will be used for analytical purposes. ProjectRun21 will examine if particular subgroups of runners with certain running experiences and running paces seem to sustain more running-related injuries compared with other subgroups of runners. This will enable sport coaches, physiotherapists as well as the runners to evaluate their injury risk of taking up a 14-week running schedule for half-marathon.

  20. Operational Planning of Channel Airlift Missions Using Forecasted Demand

    DTIC Science & Technology

    2013-03-01

    tailored to the specific problem ( Metaheuristics , 2005). As seen in the section Cargo Loading Algorithm , heuristic methods are often iterative...that are equivalent to the forecasted cargo amount. The simulated pallets are then used in a heuristic cargo loading algorithm . The loading... algorithm places cargo onto available aircraft (based on real schedules) given the date and the destination and outputs statistics based on the aircraft ton

  1. Low Probability Tail Event Analysis and Mitigation in BPA Control Area: Task 2 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lu, Shuai; Makarov, Yuri V.; McKinstry, Craig A.

    Task report detailing low probability tail event analysis and mitigation in BPA control area. Tail event refers to the situation in a power system when unfavorable forecast errors of load and wind are superposed onto fast load and wind ramps, or non-wind generators falling short of scheduled output, causing the imbalance between generation and load to become very significant.

  2. Future Air Traffic Growth and Schedule Model User's Guide

    NASA Technical Reports Server (NTRS)

    Kimmel, William M. (Technical Monitor); Smith, Jeremy C.; Dollyhigh, Samuel M.

    2004-01-01

    The Future Air Traffic Growth and Schedule Model was developed as an implementation of the Fratar algorithm to project future traffic flow between airports in a system and of then scheduling the additional flights to reflect current passenger time-of-travel preferences. The methodology produces an unconstrained future schedule from a current (or baseline) schedule and the airport operations growth rates. As an example of the use of the model, future schedules are projected for 2010 and 2022 for all flights arriving at, departing from, or flying between all continental United States airports that had commercial scheduled service for May 17, 2002. Inter-continental US traffic and airports are included and the traffic is also grown with the Fratar methodology to account for their arrivals and departures to the continental US airports. Input data sets derived from the Official Airline Guide (OAG) data and FAA Terminal Area Forecast (TAF) are included in the examples of the computer code execution.

  3. DTS: Building custom, intelligent schedulers

    NASA Technical Reports Server (NTRS)

    Hansson, Othar; Mayer, Andrew

    1994-01-01

    DTS is a decision-theoretic scheduler, built on top of a flexible toolkit -- this paper focuses on how the toolkit might be reused in future NASA mission schedulers. The toolkit includes a user-customizable scheduling interface, and a 'Just-For-You' optimization engine. The customizable interface is built on two metaphors: objects and dynamic graphs. Objects help to structure problem specifications and related data, while dynamic graphs simplify the specification of graphical schedule editors (such as Gantt charts). The interface can be used with any 'back-end' scheduler, through dynamically-loaded code, interprocess communication, or a shared database. The 'Just-For-You' optimization engine includes user-specific utility functions, automatically compiled heuristic evaluations, and a postprocessing facility for enforcing scheduling policies. The optimization engine is based on BPS, the Bayesian Problem-Solver (1,2), which introduced a similar approach to solving single-agent and adversarial graph search problems.

  4. Inspection and monitoring of wind turbine blade-embedded wave defects during fatigue testing

    DOE PAGES

    Niezrecki, Christopher; Avitabile, Peter; Chen, Julie; ...

    2014-05-20

    The research we present in this article focuses on a 9-m CX-100 wind turbine blade, designed by a team led by Sandia National Laboratories and manufactured by TPI Composites Inc. The key difference between the 9-m blade and baseline CX-100 blades is that this blade contains fabric wave defects of controlled geometry inserted at specified locations along the blade length. The defect blade was tested at the National Wind Technology Center at the National Renewable Energy Laboratory using a schedule of cycles at increasing load level until failure was detected. Our researchers used digital image correlation, shearography, acoustic emission, fiber-opticmore » strain sensing, thermal imaging, and piezoelectric sensing as structural health monitoring techniques. Furthermore, this article provides a comparison of the sensing results of these different structural health monitoring approaches to detect the defects and track the resultant damage from the initial fatigue cycle to final failure.« less

  5. Quantification of training load during one-, two- and three-game week schedules in professional soccer players from the English Premier League: implications for carbohydrate periodisation.

    PubMed

    Anderson, Liam; Orme, Patrick; Di Michele, Rocco; Close, Graeme L; Morgans, Ryland; Drust, Barry; Morton, James P

    2016-01-01

    Muscle glycogen is the predominant energy source for soccer match play, though its importance for soccer training (where lower loads are observed) is not well known. In an attempt to better inform carbohydrate (CHO) guidelines, we quantified training load in English Premier League soccer players (n = 12) during a one-, two- and three-game week schedule (weekly training frequency was four, four and two, respectively). In a one-game week, training load was progressively reduced (P < 0.05) in 3 days prior to match day (total distance = 5223 ± 406, 3097 ± 149 and 2912 ± 192 m for day 1, 2 and 3, respectively). Whilst daily training load and periodisation was similar in the one- and two-game weeks, total accumulative distance (inclusive of both match and training load) was higher in a two-game week (32.5 ± 4.1 km) versus one-game week (25.9 ± 2 km). In contrast, daily training total distance was lower in the three-game week (2422 ± 251 m) versus the one- and two-game weeks, though accumulative weekly distance was highest in this week (35.5 ± 2.4 km) and more time (P < 0.05) was spent in speed zones >14.4 km · h(-1) (14%, 18% and 23% in the one-, two- and three-game weeks, respectively). Considering that high CHO availability improves physical match performance but high CHO availability attenuates molecular pathways regulating training adaptation (especially considering the low daily customary loads reported here, e.g., 3-5 km per day), we suggest daily CHO intake should be periodised according to weekly training and match schedules.

  6. Analyzing NPS Scheduling Using OSIRIS

    DTIC Science & Technology

    1993-03-01

    School TEACHER SCHEDULE BLOCKS REPORT Date: 2/19/93 Period Name ID Term Days 1234 Adragna , Joe 170401 1 F xx Agrawal, Brij 120101 1 F xx Almquist...LOAD REPORT Date: 3/18/93 Total Max Consec Total Teacher ID Term Classes Classes Stud Adragna , Joe 170401 1 1 1 3 Agrawal, Brij 120101 1 2 2 98 Aiello

  7. Modeling and Analysis of Commercial Building Electrical Loads for Demand Side Management

    NASA Astrophysics Data System (ADS)

    Berardino, Jonathan

    In recent years there has been a push in the electric power industry for more customer involvement in the electricity markets. Traditionally the end user has played a passive role in the planning and operation of the power grid. However, many energy markets have begun opening up opportunities to consumers who wish to commit a certain amount of their electrical load under various demand side management programs. The potential benefits of more demand participation include reduced operating costs and new revenue opportunities for the consumer, as well as more reliable and secure operations for the utilities. The management of these load resources creates challenges and opportunities to the end user that were not present in previous market structures. This work examines the behavior of commercial-type building electrical loads and their capacity for supporting demand side management actions. This work is motivated by the need for accurate and dynamic tools to aid in the advancement of demand side operations. A dynamic load model is proposed for capturing the response of controllable building loads. Building-specific load forecasting techniques are developed, with particular focus paid to the integration of building management system (BMS) information. These approaches are tested using Drexel University building data. The application of building-specific load forecasts and dynamic load modeling to the optimal scheduling of multi-building systems in the energy market is proposed. Sources of potential load uncertainty are introduced in the proposed energy management problem formulation in order to investigate the impact on the resulting load schedule.

  8. Non preemptive soft real time scheduler: High deadline meeting rate on overload

    NASA Astrophysics Data System (ADS)

    Khalib, Zahereel Ishwar Abdul; Ahmad, R. Badlishah; El-Shaikh, Mohamed

    2015-05-01

    While preemptive scheduling has gain more attention among researchers, current work in non preemptive scheduling had shown promising result in soft real time jobs scheduling. In this paper we present a non preemptive scheduling algorithm meant for soft real time applications, which is capable of producing better performance during overload while maintaining excellent performance during normal load. The approach taken by this algorithm has shown more promising results compared to other algorithms including its immediate predecessor. We will present the analysis made prior to inception of the algorithm as well as simulation results comparing our algorithm named gutEDF with EDF and gEDF. We are convinced that grouping jobs utilizing pure dynamic parameters would produce better performance.

  9. Quantum load balancing in ad hoc networks

    NASA Astrophysics Data System (ADS)

    Hasanpour, M.; Shariat, S.; Barnaghi, P.; Hoseinitabatabaei, S. A.; Vahid, S.; Tafazolli, R.

    2017-06-01

    This paper presents a novel approach in targeting load balancing in ad hoc networks utilizing the properties of quantum game theory. This approach benefits from the instantaneous and information-less capability of entangled particles to synchronize the load balancing strategies in ad hoc networks. The quantum load balancing (QLB) algorithm proposed by this work is implemented on top of OLSR as the baseline routing protocol; its performance is analyzed against the baseline OLSR, and considerable gain is reported regarding some of the main QoS metrics such as delay and jitter. Furthermore, it is shown that QLB algorithm supports a solid stability gain in terms of throughput which stands a proof of concept for the load balancing properties of the proposed theory.

  10. 500 MW demonstration of advanced wall-fired combustion techniques for the reduction of nitrogen oxide (NO{sub x}) emissions from coal fired boilers. Second quarterly technical progress report, [April--June 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-12-31

    The primary goal of this project is the characterization of the low NO{sub x} combustion equipment through the collection and analysis of long-term emissions data. A target of achieving fifty percent NO{sub x} reduction using combustion modifications has been established for the project. The project provides a stepwise retrofit of an advanced overfire air (AOFA) system followed by low NO{sub x} burners (LNB). During each test phase of the project, diagnostic, performance, long-term and verification testing will be performed. These tests are used to quantify the NO{sub x} reductions of each technology and evaluate the effects of those reductions onmore » other combustion parameters such as particulate characteristics and boiler efficiency. Baseline, AOFA, and LNB without AOFA test segments have been completed. Analysis of the 94 days of LNB long-term data collected show the full-load NO{sub x} emission levels to be approximately 0.65 lb/MBtu with flyash LOI values of approximately 8 percent. Corresponding values for the AOFA configuration are 0.94 lb/MBtu and approximately 10 percent. For comparison, the long-term full-load, baseline NO{sub x} emission level was approximately 1.24 lb/MBtu at 5.2 percent LOI. Comprehensive testing of the LNB plus AOFA configuration began in May 1993 and is scheduled to end during August 1993. As of June 30, the diagnostic, performance, chemical emissions tests segments for this configuration have been conducted and 29 days of long-term, emissions data collected. Preliminary results from the May--June 1993 tests of the LNB plus AOFA system show that the full load NO{sub x} emissions are approximately 0.42 lb/MBtu with corresponding fly ash LOI values near 8 percent. This is a substantial improvement in both NO{sub x} emissions and LOI values when compared to the results obtained during the February--March 1992 abbreviated testing of this system.« less

  11. Effects of GABA[subscript A] Modulators on the Repeated Acquisition of Response Sequences in Squirrel Monkeys

    ERIC Educational Resources Information Center

    Campbell, Una C.; Winsauer, Peter J.; Stevenson, Michael W.; Moerschbaecher, Joseph M.

    2004-01-01

    The present study investigated the effects of positive and negative GABA[subscript A] modulators under three different baselines of repeated acquisition in squirrel monkeys in which the monkeys acquired a three-response sequence on three keys under a second-order fixed-ratio (FR) schedule of food reinforcement. In two of these baselines, the…

  12. The Effects of Baseline Estimation on the Reliability, Validity, and Precision of CBM-R Growth Estimates

    ERIC Educational Resources Information Center

    Van Norman, Ethan R.; Christ, Theodore J.; Zopluoglu, Cengiz

    2013-01-01

    This study examined the effect of baseline estimation on the quality of trend estimates derived from Curriculum Based Measurement of Oral Reading (CBM-R) progress monitoring data. The authors used a linear mixed effects regression (LMER) model to simulate progress monitoring data for schedules ranging from 6-20 weeks for datasets with high and low…

  13. Machine Learning Based Online Performance Prediction for Runtime Parallelization and Task Scheduling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, J; Ma, X; Singh, K

    2008-10-09

    With the emerging many-core paradigm, parallel programming must extend beyond its traditional realm of scientific applications. Converting existing sequential applications as well as developing next-generation software requires assistance from hardware, compilers and runtime systems to exploit parallelism transparently within applications. These systems must decompose applications into tasks that can be executed in parallel and then schedule those tasks to minimize load imbalance. However, many systems lack a priori knowledge about the execution time of all tasks to perform effective load balancing with low scheduling overhead. In this paper, we approach this fundamental problem using machine learning techniques first to generatemore » performance models for all tasks and then applying those models to perform automatic performance prediction across program executions. We also extend an existing scheduling algorithm to use generated task cost estimates for online task partitioning and scheduling. We implement the above techniques in the pR framework, which transparently parallelizes scripts in the popular R language, and evaluate their performance and overhead with both a real-world application and a large number of synthetic representative test scripts. Our experimental results show that our proposed approach significantly improves task partitioning and scheduling, with maximum improvements of 21.8%, 40.3% and 22.1% and average improvements of 15.9%, 16.9% and 4.2% for LMM (a real R application) and synthetic test cases with independent and dependent tasks, respectively.« less

  14. EQUATING FACULTY LOADS.

    ERIC Educational Resources Information Center

    OOSTING, KENNETH W.

    AT ALPENA COMMUNITY COLLEGE, A NORMAL TEACHING LOAD FOR ANY FACULTY MEMBER IS 14-16 SEMESTER HOURS, WITH 75-125 STUDENTS AND 2-3 PREPARATIONS. VARIATIONS FROM THE SCHEDULE ARE IN ACCORDANCE WITH SPECIFIC FORMULAS RELATING TO TOTAL MEMBERS OF STUDENTS, NUMBERS OF PREPARATIONS, ASSIGNMENT TO ENGLISH COMPOSITION CLASSES, NEW COURSES, AND CLASSES…

  15. 40 CFR 86.1229-85 - Dynamometer load determination and fuel temperature profile.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... specified driving schedule. The design of the laboratory facility should include consideration of any parameters that may affect fuel temperatures, such as solar loading, pavement heat, and relative wind... be at least 125 °F throughout the driving period. Pavement temperature shall be measured and recorded...

  16. 40 CFR 86.1229-85 - Dynamometer load determination and fuel temperature profile.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... specified driving schedule. The design of the laboratory facility should include consideration of any parameters that may affect fuel temperatures, such as solar loading, pavement heat, and relative wind... be at least 125 °F throughout the driving period. Pavement temperature shall be measured and recorded...

  17. 40 CFR 86.1229-85 - Dynamometer load determination and fuel temperature profile.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... specified driving schedule. The design of the laboratory facility should include consideration of any parameters that may affect fuel temperatures, such as solar loading, pavement heat, and relative wind... be at least 125 °F throughout the driving period. Pavement temperature shall be measured and recorded...

  18. 40 CFR 86.1229-85 - Dynamometer load determination and fuel temperature profile.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... specified driving schedule. The design of the laboratory facility should include consideration of any parameters that may affect fuel temperatures, such as solar loading, pavement heat, and relative wind... be at least 125 °F throughout the driving period. Pavement temperature shall be measured and recorded...

  19. OGUPSA sensor scheduling architecture and algorithm

    NASA Astrophysics Data System (ADS)

    Zhang, Zhixiong; Hintz, Kenneth J.

    1996-06-01

    This paper introduces a new architecture for a sensor measurement scheduler as well as a dynamic sensor scheduling algorithm called the on-line, greedy, urgency-driven, preemptive scheduling algorithm (OGUPSA). OGUPSA incorporates a preemptive mechanism which uses three policies, (1) most-urgent-first (MUF), (2) earliest- completed-first (ECF), and (3) least-versatile-first (LVF). The three policies are used successively to dynamically allocate and schedule and distribute a set of arriving tasks among a set of sensors. OGUPSA also can detect the failure of a task to meet a deadline as well as generate an optimal schedule in the sense of minimum makespan for a group of tasks with the same priorities. A side benefit is OGUPSA's ability to improve dynamic load balance among all sensors while being a polynomial time algorithm. Results of a simulation are presented for a simple sensor system.

  20. An ex ante control chart for project monitoring using earned duration management observations

    NASA Astrophysics Data System (ADS)

    Mortaji, Seyed Taha Hossein; Noori, Siamak; Noorossana, Rassoul; Bagherpour, Morteza

    2017-12-01

    In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project's performance indicators, by plotting them on the Shewhart-type control charts over time. However, these control charts are fundamentally designed for processes and ignore project-specific dynamics, which can lead to weak results and misleading interpretations. By paying close attention to the project baseline schedule and using statistical foundations, this paper proposes a new ex ante control chart which discriminates between acceptable (as-planned) and non-acceptable (not-as-planned) variations of the project's schedule performance. Such control chart enables project managers to set more realistic thresholds leading to a better decision making for taking corrective and/or preventive actions. For the sake of clarity, an illustrative example has been presented to show how the ex ante control chart is constructed in practice. Furthermore, an experimental investigation has been set up to analyze the performance of the proposed control chart. As expected, the results confirm that, when a project starts to deflect significantly from the project's baseline schedule, the ex ante control chart shows a respectable ability to detect and report right signals while avoiding false alarms.

  1. Remote effects of aversive contingencies: Disruption of appetitive behavior by adjacent avoidance sessions

    PubMed Central

    Hackenberg, Timothy D.; Hineline, Philip N.

    1987-01-01

    Disruption of ongoing appetitive behavior before and after daily avoidance sessions was examined. After baselines of appetitive responding were established under a fixed-interval 180-s schedule of food presentation, 4 rats were exposed to 40-min sessions of the appetitive schedule just prior to 100-min sessions of electric shock postponement, while another 4 rats received the 40-min appetitive sessions just following daily sessions of shock postponement. In all 8 subjects, fixed-interval response rates decreased relative to baseline levels, the effect being somewhat more pronounced when the avoidance sessions immediately followed. The disruption of fixed-interval responding was only partially reversed when avoidance sessions were discontinued. During the initial exposure to the avoidance sessions, patterns of responding under the fixed-interval schedule were differentially sensitive to disruption, with high baseline response rates generally more disturbed than low rates. These disruptions were not systematically related to changes in reinforcement frequency, which remained fairly high and invariant across all conditions of the experiment; they were also not systematically related to the response rates or to the shock rates of the adjacent avoidance sessions. The results, while qualitatively resembling patterns of conditioned suppression as typically studied, occurred on a greatly expanded time scale. As disruption of behavior extending over time, the present data suggest that some forms of conditioned suppression are perhaps best viewed within a larger temporal context. PMID:16812486

  2. Estimates of Refrigerator Loads in Public Housing Based on Metered Consumption Data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, JD; Pratt, RG

    1998-09-11

    The New York Power Authority (NYPA), the New York City Housing Authority (NYCHA), and the U.S. Departments of Housing and Urban Development (HUD) and Energy (DOE) have joined in a project to replace refrigerators in New York City public housing with new, highly energy-efficient models. This project laid the ground work for the Consortium for Energy Efficiency (CEE) and DOE to enable housing authorities throughout the United States to bulk-purchase energy-efficient appliances. DOE helped develop and plan the program through the ENERGY STAR@ Partnerships program conducted by its Pacific Nofiwest National Laboratory (PNNL). PNNL was subsequently asked to conduct themore » savings evahations for 1996 and 1997. PNNL designed the metering protocol and occupant survey, supplied and calibrated the metering equipment, and managed and analyzed the data. The 1996 metering study of refrigerator energy usage in New York City public housing (Pratt and Miller 1997) established the need and justification for a regression-model-based approach to an energy savings estimate. The need originated in logistical difficulties associated with sampling the population and pen?orming a stratified analysis. Commonly, refrigerators[a) with high representation in the population were missed in the sampling schedule, leaving significant holes in the sample and difficulties for the stratified anrdysis. The just{jfcation was found in the fact that strata (distinct groups of identical refrigerators) were not statistically distinct in terms of their label ratio (ratio of metered consumption to label rating). This finding suggested a general regression model could be used to represent the consumption of all refrigerators in the population. In 1996 a simple two-coefficient regression model, a function of only the refrigerator label rating, was developed and used to represent the existing population of refrigerators. A key concept used in the 1997 study grew from findings in a small number of apartments metered in 1996 with a detailed protocol. Fifteen-minute time-series data of ambient and compartment temperatures and refrigerator power were analyzed and demonstrated the potential for reducing power records into three components. This motivated the development of an analysis process to divide the metered consumption into baseline load, occupant-associated load, and defrosting load. The baseline load is the consumption that would occur if the refrigerator were on but had no occupant usage load (no door-opening events) and the defrosting mechanism was disabled. The motivation behind this component reduction process was the hope that components could be more effectively modeled than the total. We reasoned that the components would lead to abetter (more general and more significant) understanding of the relationships between consumption, the characteristics of the refrigerator, and its operating environment.« less

  3. T-Cap Pull-Off and Bending Behavior for Stitched Structure

    NASA Technical Reports Server (NTRS)

    Lovejoy, Andrew E.; Leone, Frank A., Jr.

    2016-01-01

    The Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS) is a structural concept that was developed by The Boeing Company to address the complex structural design aspects associated with a pressurized hybrid wing body aircraft configuration. An important design feature required for assembly is the integrally stitched T-cap, which provides connectivity of the corner (orthogonal) joint between adjacent panels. A series of tests were conducted on T-cap test articles, with and without a rod stiffener penetrating the T-cap web, under tension (pull-off) and bending loads. Three designs were tested, including the baseline design used in largescale test articles. The baseline had only the manufacturing stitch row adjacent to the fillet at the base of the T-cap web. Two new designs added stitching rows to the T-cap web at either 0.5- or 1.0-inch spacing along the height of the web. Testing was conducted at NASA Langley Research Center to determine the behavior of the T-cap region resulting from the applied loading. Results show that stitching arrests the initial delamination failures so that the maximum strength capability exceeds the load at which the initial delaminations develop. However, it was seen that the added web stitching had very little effect on the initial delamination failure load, but actually decreased the initial delamination failure load for tension loading of test articles without a stiffener passing through the web. Additionally, the added web stitching only increased the maximum load capability by between 1% and 12.5%. The presence of the stiffener, however, did increase the initial and maximum loads for both tension and bending loading as compared to the stringerless baseline design. Based on the results of the few samples tested, the additional stitching in the T-cap web showed little advantage over the baseline design in terms of structural failure at the T-cap web/skin junction for the current test articles.

  4. Tension and Bending Testing of an Integral T-Cap for Stitched Composite Airframe Joints

    NASA Technical Reports Server (NTRS)

    Lovejoy, Andrew E.; Leone, Frank A., Jr.

    2016-01-01

    The Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS) is a structural concept that was developed by The Boeing Company to address the complex structural design aspects associated with a pressurized hybrid wing body aircraft configuration. An important design feature required for assembly is the integrally stitched T-cap, which provides connectivity of the corner (orthogonal) joint between adjacent panels. A series of tests were conducted on T-cap test articles, with and without a rod stiffener penetrating the T-cap web, under tension (pull-off) and bending loads. Three designs were tested, including the baseline design used in large-scale test articles. The baseline had only the manufacturing stitch row adjacent to the fillet at the base of the T-cap web. Two new designs added stitching rows to the T-cap web at either 0.5- or 1.0-inch spacing along the height of the web. Testing was conducted at NASA Langley Research Center to determine the behavior of the T-cap region resulting from the applied loading. Results show that stitching arrests the initial delamination failures so that the maximum strength capability exceeds the load at which the initial delaminations develop. However, it was seen that the added web stitching had very little effect on the initial delamination failure load, but actually decreased the initial delamination failure load for tension loading of test articles without a stiffener passing through the web. Additionally, the added web stitching only increased the maximum load capability by between 1% and 12.5%. The presence of the stiffener, however, did increase the initial and maximum loads for both tension and bending loading as compared to the stringerless baseline design. Based on the results of the few samples tested, the additional stitching in the T-cap web showed little advantage over the baseline design in terms of structural failure at the T-cap web/skin junction for the current test articles.

  5. Cost and schedule estimation study report

    NASA Technical Reports Server (NTRS)

    Condon, Steve; Regardie, Myrna; Stark, Mike; Waligora, Sharon

    1993-01-01

    This report describes the analysis performed and the findings of a study of the software development cost and schedule estimation models used by the Flight Dynamics Division (FDD), Goddard Space Flight Center. The study analyzes typical FDD projects, focusing primarily on those developed since 1982. The study reconfirms the standard SEL effort estimation model that is based on size adjusted for reuse; however, guidelines for the productivity and growth parameters in the baseline effort model have been updated. The study also produced a schedule prediction model based on empirical data that varies depending on application type. Models for the distribution of effort and schedule by life-cycle phase are also presented. Finally, this report explains how to use these models to plan SEL projects.

  6. Apolipoprotein E genotype does not moderate the associations of depressive symptoms, neuroticism and allostatic load with cognitive ability and cognitive aging in the Lothian Birth Cohort 1936

    PubMed Central

    Booth, Tom; Cox, Simon R.; Corley, Janie; Dykiert, Dominika; Redmond, Paul; Pattie, Alison; Taylor, Adele M.; Harris, Sarah E.; Starr, John M.; Deary, Ian J.

    2018-01-01

    Objectives In this replication-and-extension study, we tested whether depressive symptoms, neuroticism, and allostatic load (multisystem physiological dysregulation) were related to lower baseline cognitive ability and greater subsequent cognitive decline in older adults, and whether these relationships were moderated by the E4 allele of the apolipoprotein E (APOE) gene. We also tested whether allostatic load mediated the relationships between neuroticism and cognitive outcomes. Methods We used data from the Lothian Birth Cohort 1936 (n at Waves 1–3: 1,028 [M age = 69.5 y]; 820 [M duration since Wave 1 = 2.98 y]; 659 [M duration since Wave 1 = 6.74 y]). We fitted latent growth curve models of general cognitive ability (modeled using five cognitive tests) with groups of APOE E4 non-carriers and carriers. In separate models, depressive symptoms, neuroticism, and allostatic load predicted baseline cognitive ability and subsequent cognitive decline. In addition, models tested whether allostatic load mediated relationships between neuroticism and cognitive outcomes. Results Baseline cognitive ability had small-to-moderate negative associations with depressive symptoms (β range = -0.20 to -0.17), neuroticism (β range = -0.27 to -0.23), and allostatic load (β range = -0.11 to 0.09). Greater cognitive decline was linked to baseline allostatic load (β range = -0.98 to -0.83) and depressive symptoms (β range = -1.00 to -0.88). However, APOE E4 allele possession did not moderate the relationships of depressive symptoms, neuroticism and allostatic load with cognitive ability and cognitive decline. Additionally, the associations of neuroticism with cognitive ability and cognitive decline were not mediated through allostatic load. Conclusions Our results suggest that APOE E4 status does not moderate the relationships of depressive symptoms, neuroticism, and allostatic load with cognitive ability and cognitive decline in healthy older adults. The most notable positive finding in the current research was the strong association between allostatic load and cognitive decline. PMID:29451880

  7. Dietary Acid Load and Incident Chronic Kidney Disease: Results from the ARIC Study

    PubMed Central

    Rebholz, Casey M.; Coresh, Josef; Grams, Morgan E.; Steffen, Lyn M.; Anderson, Cheryl A.M.; Appel, Lawrence J.; Crews, Deidra C.

    2016-01-01

    Background Higher dietary acid load can result in metabolic acidosis and is associated with faster kidney disease progression in patients with chronic kidney disease (CKD). However, the relationship between dietary acid load and incident CKD has not been evaluated. Methods We conducted prospective analyses of Atherosclerosis Risk in Communities study participants without CKD at baseline (1987–89, N=15,055). Dietary acid load was estimated using the equation for potential renal acid load by Remer and Manz, incorporating dietary intake data from a food frequency questionnaire. Incident CKD was assessed from baseline through 2010 and defined as eGFR <60 mL/min/1.73 m2 accompanied by 25% eGFR decline, CKD-related hospitalization or death, or end-stage renal disease identified by linkage to the U.S. Renal Data System registry. Results In the overall study population, 55% were female, 26% were African-American, and mean age at baseline was 54 years. During a median follow-up of 21 years, there were 2,351 (15.6%) incident CKD cases. After adjusting for demographics (age, sex, race-center), established risk factors (diabetes status, hypertension status, overweight/obese status, smoking status, education level, physical activity), caloric intake, and baseline eGFR, higher dietary acid load was associated with higher risk of incident CKD [hazard ratio (HR) for quartile 4 vs. 1: 1.13, 95% confidence interval (CI): 1.01, 1.28, p for trend=0.02; HR per interquartile range increase: 1.06, 95% CI: 1.00, 1.11, p=0.04]. Conclusion Dietary acid load is associated with incident CKD in a population-based sample. These data suggest a potential avenue for CKD risk reduction through diet. PMID:26789417

  8. Association of Post-Saline Load Plasma Aldosterone Levels With Left Ventricular Hypertrophy in Primary Hypertension.

    PubMed

    Catena, Cristiana; Verheyen, Nicolas D; Url-Michitsch, Marion; Kraigher-Krainer, Elisabeth; Colussi, GianLuca; Pilz, Stefan; Tomaschitz, Andreas; Pieske, Burkert; Sechi, Leonardo A

    2016-03-01

    Left ventricular hypertrophy (LVH) is an independent risk factor for cardiovascular morbidity in hypertension. Current evidence suggests a contribution to LVH of plasma aldosterone levels that are inappropriately elevated for the salt status. The aim of this study was to investigate whether inappropriate modulation of aldosterone production by a saline load is associated with left ventricular (LV) mass in hypertensive patients. In 90 hypertensive patients free of clinically relevant cardiovascular complications in whom secondary forms of hypertension were ruled out, we performed a standard intravenous saline load (0.9% NaCl, 2 l in 4 hours) with measurement of plasma aldosterone and active renin at baseline and end of infusion. Bi-dimensional echocardiography was performed for the assessment of cardiac morphology and function. LVH was present in 19% of patients who had significantly worse renal function and higher body mass, blood pressure, and plasma aldosterone levels measured both at baseline and after the saline load than patients without LVH. LV mass was directly related to age, body mass, systolic blood pressure, duration of hypertension, baseline, and post-saline load plasma aldosterone levels and inversely to glomerular filtration. Multivariate regression analysis showed independent correlation of LV mass with body mass, systolic blood pressure, and plasma aldosterone levels measured after intravenous saline load, but not at baseline. In patients with hypertension, aldosterone levels measured after intravenous saline load are related to LV mass independent of age, body mass, and blood pressure, suggesting that limited ability of salt to modulate aldosterone production could contribute to LVH. © American Journal of Hypertension, Ltd 2015. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  9. Scheduling lessons learned from the Autonomous Power System

    NASA Technical Reports Server (NTRS)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  10. Autonomous power expert system

    NASA Technical Reports Server (NTRS)

    Ringer, Mark J.; Quinn, Todd M.

    1990-01-01

    The goal of the Autonomous Power System (APS) program is to develop and apply intelligent problem solving and control technologies to the Space Station Freedom Electrical Power Systems (SSF/EPS). The objectives of the program are to establish artificial intelligence/expert system technology paths, to create knowledge based tools with advanced human-operator interfaces, and to integrate and interface knowledge-based and conventional control schemes. This program is being developed at the NASA-Lewis. The APS Brassboard represents a subset of a 20 KHz Space Station Power Management And Distribution (PMAD) testbed. A distributed control scheme is used to manage multiple levels of computers and switchgear. The brassboard is comprised of a set of intelligent switchgear used to effectively switch power from the sources to the loads. The Autonomous Power Expert System (APEX) portion of the APS program integrates a knowledge based fault diagnostic system, a power resource scheduler, and an interface to the APS Brassboard. The system includes knowledge bases for system diagnostics, fault detection and isolation, and recommended actions. The scheduler autonomously assigns start times to the attached loads based on temporal and power constraints. The scheduler is able to work in a near real time environment for both scheduling and dynamic replanning.

  11. Autonomous power expert system

    NASA Technical Reports Server (NTRS)

    Ringer, Mark J.; Quinn, Todd M.

    1990-01-01

    The goal of the Autonomous Power System (APS) program is to develop and apply intelligent problem solving and control technologies to the Space Station Freedom Electrical Power Systems (SSF/EPS). The objectives of the program are to establish artificial intelligence/expert system technology paths, to create knowledge based tools with advanced human-operator interfaces, and to integrate and interface knowledge-based and conventional control schemes. This program is being developed at the NASA-Lewis. The APS Brassboard represents a subset of a 20 KHz Space Station Power Management And Distribution (PMAD) testbed. A distributed control scheme is used to manage multiple levels of computers and switchgear. The brassboard is comprised of a set of intelligent switchgear used to effectively switch power from the sources to the loads. The Autonomous Power Expert System (APEX) portion of the APS program integrates a knowledge based fault diagnostic system, a power resource scheduler, and an interface to the APS Brassboard. The system includes knowledge bases for system diagnostics, fault detection and isolation, and recommended actions. The scheduler autonomously assigns start times to the attached loads based on temporal and power constraints. The scheduler is able to work in a near real time environment for both scheduling an dynamic replanning.

  12. Robust optimisation-based microgrid scheduling with islanding constraints

    DOE PAGES

    Liu, Guodong; Starke, Michael; Xiao, Bailu; ...

    2017-02-17

    This paper proposes a robust optimization based optimal scheduling model for microgrid operation considering constraints of islanding capability. Our objective is to minimize the total operation cost, including generation cost and spinning reserve cost of local resources as well as purchasing cost of energy from the main grid. In order to ensure the resiliency of a microgrid and improve the reliability of the local electricity supply, the microgrid is required to maintain enough spinning reserve (both up and down) to meet local demand and accommodate local renewable generation when the supply of power from the main grid is interrupted suddenly,more » i.e., microgrid transitions from grid-connected into islanded mode. Prevailing operational uncertainties in renewable energy resources and load are considered and captured using a robust optimization method. With proper robust level, the solution of the proposed scheduling model ensures successful islanding of the microgrid with minimum load curtailment and guarantees robustness against all possible realizations of the modeled operational uncertainties. Numerical simulations on a microgrid consisting of a wind turbine, a PV panel, a fuel cell, a micro-turbine, a diesel generator and a battery demonstrate the effectiveness of the proposed scheduling model.« less

  13. Physician satisfaction with a multi-platform digital scheduling system

    PubMed Central

    Rocha, Leonardo Lima; Lima, Alex Heitor; Santiago, Caroline Reis Maia; Terra, Jose Cláudio Cyrineu; Dagan, Alon; Celi, Leo Anthony

    2017-01-01

    Objective Physician shift schedules are regularly created manually, using paper or a shared online spreadsheet. Mistakes are not unusual, leading to last minute scrambles to cover a shift. We developed a web-based shift scheduling system and a mobile application tool to facilitate both the monthly scheduling and shift exchanges between physicians. The primary objective was to compare physician satisfaction before and after the mobile application implementation. Methods Over a 9-month period, three surveys, using the 4-point Likert type scale were performed to assess the physician satisfaction. The first survey was conducted three months prior mobile application release, a second survey three months after implementation and the last survey six months after. Results 51 (77%) of the physicians answered the baseline survey. Of those, 32 (63%) were males with a mean age of 37.8 ± 5.5 years. Prior to the mobile application implementation, 36 (70%) of the responders were using more than one method to carry out shift exchanges and only 20 (40%) were using the official department report sheet to document shift exchanges. The second and third survey were answered by 48 (73%) physicians. Forty-eight (98%) of them found the mobile application easy or very easy to install and 47 (96%) did not want to go back to the previous method. Regarding physician satisfaction, at baseline 37% of the physicians were unsatisfied or very unsatisfied with shift scheduling. After the mobile application was implementation, only 4% reported being unsatisfied (OR = 0.11, p < 0.001). The satisfaction level improved from 63% to 96% between the first and the last survey. Satisfaction levels significantly increased between the three time points (OR = 13.33, p < 0.001). Conclusion Our web and mobile phone-based scheduling system resulted in better physician satisfaction. PMID:28328958

  14. Physical exercise accelerates reentrainment of human sleep-wake cycle but not of plasma melatonin rhythm to 8-h phase-advanced sleep schedule.

    PubMed

    Yamanaka, Yujiro; Hashimoto, Satoko; Tanahashi, Yusuke; Nishide, Shin-Ya; Honma, Sato; Honma, Ken-Ichi

    2010-03-01

    Effects of timed physical exercise were examined on the reentrainment of sleep-wake cycle and circadian rhythms to an 8-h phase-advanced sleep schedule. Seventeen male adults spent 12 days in a temporal isolation facility with dim light conditions (<10 lux). The sleep schedule was phase-advanced by 8 h from their habitual sleep times for 4 days, which was followed by a free-run session for 6 days, during which the subjects were deprived of time cues. During the shift schedule, the exercise group (n = 9) performed physical exercise with a bicycle ergometer in the early and middle waking period for 2 h each. The control group (n = 8) sat on a chair at those times. Their sleep-wake cycles were monitored every day by polysomnography and/or weight sensor equipped with a bed. The circadian rhythm in plasma melatonin was measured on the baseline day before phase shift: on the 4th day of shift schedule and the 5th day of free-run. As a result, the sleep-onset on the first day of free-run in the exercise group was significantly phase-advanced from that in the control and from the baseline. On the other hand, the circadian melatonin rhythm was significantly phase-delayed in the both groups, showing internal desynchronization of the circadian rhythms. The sleep-wake cycle resynchronized to the melatonin rhythm by either phase-advance or phase-delay shifts in the free-run session. These findings indicate that the reentrainment of the sleep-wake cycle to a phase-advanced schedule occurs independent of the circadian pacemaker and is accelerated by timed physical exercise.

  15. Physician satisfaction with a multi-platform digital scheduling system.

    PubMed

    Deliberato, Rodrigo Octávio; Rocha, Leonardo Lima; Lima, Alex Heitor; Santiago, Caroline Reis Maia; Terra, Jose Cláudio Cyrineu; Dagan, Alon; Celi, Leo Anthony

    2017-01-01

    Physician shift schedules are regularly created manually, using paper or a shared online spreadsheet. Mistakes are not unusual, leading to last minute scrambles to cover a shift. We developed a web-based shift scheduling system and a mobile application tool to facilitate both the monthly scheduling and shift exchanges between physicians. The primary objective was to compare physician satisfaction before and after the mobile application implementation. Over a 9-month period, three surveys, using the 4-point Likert type scale were performed to assess the physician satisfaction. The first survey was conducted three months prior mobile application release, a second survey three months after implementation and the last survey six months after. 51 (77%) of the physicians answered the baseline survey. Of those, 32 (63%) were males with a mean age of 37.8 ± 5.5 years. Prior to the mobile application implementation, 36 (70%) of the responders were using more than one method to carry out shift exchanges and only 20 (40%) were using the official department report sheet to document shift exchanges. The second and third survey were answered by 48 (73%) physicians. Forty-eight (98%) of them found the mobile application easy or very easy to install and 47 (96%) did not want to go back to the previous method. Regarding physician satisfaction, at baseline 37% of the physicians were unsatisfied or very unsatisfied with shift scheduling. After the mobile application was implementation, only 4% reported being unsatisfied (OR = 0.11, p < 0.001). The satisfaction level improved from 63% to 96% between the first and the last survey. Satisfaction levels significantly increased between the three time points (OR = 13.33, p < 0.001). Our web and mobile phone-based scheduling system resulted in better physician satisfaction.

  16. Quantifying Sleep and Performance of West Point Cadets: A Baseline Study

    DTIC Science & Technology

    2004-06-01

    5. Table of reported average bedtimes (n= 991) and wakeup times (n=991) of those who reported their caffeine use for the 30 days prior to reporting...Military Academy at West Point, New York, cadets assume a rigorous schedule full of competing demands—military, athletic, and academic. This...they are operating with a degraded cognitive function. At the United States Military Academy at West Point, New York, cadets assume a rigorous schedule

  17. The Relation between the Level of Job Satisfaction and Types of Personality in High School Teachers

    ERIC Educational Resources Information Center

    Ayan, Sezer; Kocacik, Faruk

    2010-01-01

    Teachers are loaded important responsibilities in educational process. The productivity and effectiveness of them are influenced by promotion, charging, job security, technological level, course load and working schedule which all are determined mostly by their institutions and influenced by noncognitive characteristics such as age, gender, family…

  18. DSN Resource Scheduling

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Baldwin, John

    2007-01-01

    TIGRAS is client-side software, which provides tracking-station equipment planning, allocation, and scheduling services to the DSMS (Deep Space Mission System). TIGRAS provides functions for schedulers to coordinate the DSN (Deep Space Network) antenna usage time and to resolve the resource usage conflicts among tracking passes, antenna calibrations, maintenance, and system testing activities. TIGRAS provides a fully integrated multi-pane graphical user interface for all scheduling operations. This is a great improvement over the legacy VAX VMS command line user interface. TIGRAS has the capability to handle all DSN resource scheduling aspects from long-range to real time. TIGRAS assists NASA mission operations for DSN tracking of station equipment resource request processes from long-range load forecasts (ten years or longer), to midrange, short-range, and real-time (less than one week) emergency tracking plan changes. TIGRAS can be operated by NASA mission operations worldwide to make schedule requests for the DSN station equipment.

  19. Optimal scheduling and its Lyapunov stability for advanced load-following energy plants with CO 2 capture

    DOE PAGES

    Bankole, Temitayo; Jones, Dustin; Bhattacharyya, Debangsu; ...

    2017-11-03

    In this study, a two-level control methodology consisting of an upper-level scheduler and a lower-level supervisory controller is proposed for an advanced load-following energy plant with CO 2 capture. With the use of an economic objective function that considers fluctuation in electricity demand and price at the upper level, optimal scheduling of energy plant electricity production and carbon capture with respect to several carbon tax scenarios is implemented. The optimal operational profiles are then passed down to corresponding lower-level supervisory controllers designed using a methodological approach that balances control complexity with performance. Finally, it is shown how optimal carbon capturemore » and electricity production rate profiles for an energy plant such as the integrated gasification combined cycle (IGCC) plant are affected by electricity demand and price fluctuations under different carbon tax scenarios. As a result, the paper also presents a Lyapunov stability analysis of the proposed scheme.« less

  20. Optimal scheduling and its Lyapunov stability for advanced load-following energy plants with CO 2 capture

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bankole, Temitayo; Jones, Dustin; Bhattacharyya, Debangsu

    In this study, a two-level control methodology consisting of an upper-level scheduler and a lower-level supervisory controller is proposed for an advanced load-following energy plant with CO 2 capture. With the use of an economic objective function that considers fluctuation in electricity demand and price at the upper level, optimal scheduling of energy plant electricity production and carbon capture with respect to several carbon tax scenarios is implemented. The optimal operational profiles are then passed down to corresponding lower-level supervisory controllers designed using a methodological approach that balances control complexity with performance. Finally, it is shown how optimal carbon capturemore » and electricity production rate profiles for an energy plant such as the integrated gasification combined cycle (IGCC) plant are affected by electricity demand and price fluctuations under different carbon tax scenarios. As a result, the paper also presents a Lyapunov stability analysis of the proposed scheme.« less

  1. Impact of different tongue cleaning methods on the bacterial load of the tongue dorsum.

    PubMed

    Bordas, Alice; McNab, Rod; Staples, Angela M; Bowman, Jim; Kanapka, Joe; Bosma, Marylynn P

    2008-04-01

    To assess the extent and duration of the effect of tongue cleaning procedures on bacterial load on the dorsal surface of the tongue. 19 subjects participated in this blinded crossover study. Subjects abstained from oral hygiene, eating and drinking from 22:00 h the previous evening. Tongue samples were collected at baseline and within 15 minutes of one of three procedures: teeth brushing alone; teeth brushing plus tongue scraping; teeth brushing plus tongue cleaning using a high speed vacuum ejector and irrigation with 20 ml antibacterial mouthwash. Subjects then brushed twice daily for 3 days apart from the second group who additionally scraped their tongue twice daily. On day 4, baseline and post-treatment samples were collected as per day 1. Bacteria (total anaerobes, Gram-negative anaerobes, VSC-producing bacteria and Streptococcus saliuarius) were enumerated using appropriate selective media. The tongue dorsum was colonized by all 4 bacterial categories (log(10) 6-8 cfu/sample). For subjects who brushed their teeth only, there was a significant reduction from baseline for S. saliuarius only. In contrast, tooth brushing plus tongue scraping resulted in statistically significant reductions from baseline for all bacterial categories (range log(10) 0.11-0.40 cfu/sample). Highly statistically significant reductions (log(10) 1.11-1.96 cfu/sample) were observed for subjects who underwent thorough tongue cleaning with the saliva ejector/mouthwash. To determine longevity of treatment effects, baseline bacterial loads for days 1 and 4 were compared. Only daily tongue scraping resulted in statistical significant reduction in baseline microbial loads on day 4. While mechanical tongue cleaning with or without chemical intervention can reduce bacterial load on the tongue, this effect is transient, and regular tongue cleaning is required to provide a long lasting (overnight) reduction in bacterial numbers. Nevertheless, tongue cleaning is an oral hygiene procedure that is little practiced due to discomfort and/or lack of awareness on the part of dental professionals and their patients.

  2. Brain atrophy and lesion load measures over 1 year relate to clinical status after 6 years in patients with clinically isolated syndromes.

    PubMed

    Di Filippo, M; Anderson, V M; Altmann, D R; Swanton, J K; Plant, G T; Thompson, A J; Miller, D H

    2010-02-01

    Conventional MRI lesion measures modestly predict long term disability in some clinically isolated syndrome (CIS) studies. Brain atrophy suggests neuroaxonal loss in multiple sclerosis (MS) with the potential to reflect disease progression to a greater extent than lesion measures. To investigate whether brain atrophy and lesion load, during the first year in patients presenting with CIS, independently predict clinical outcome (development of MS and disability at 6 years). 99 patients presenting with CIS were included in the study. T1 gadolinium enhanced and T2 weighted brain MRI was acquired at baseline and approximately 1 year later. Percentage brain atrophy rate between baseline and follow-up scans was analysed using SIENA. Mean annual brain atrophy rates were -0.38% for all patients, -0.50% in patients who had developed MS at 6 years and -0.26% in those who had not. Brain atrophy rate (p = 0.005) and baseline T2 lesion load (p<0.001) were independent predictors of clinically definite MS. While brain atrophy rate was a predictor of Expanded Disability Status Scale (EDSS) score in a univariate analysis, only 1 year T2 lesion load change (p = 0.007) and baseline gadolinium enhancing lesion number (p = 0.03) were independent predictors of EDSS score at the 6 year follow-up. T1 lesion load was the only MRI parameter which predicted Multiple Sclerosis Functional Composite score at the 6 year follow-up. The findings confirm that brain atrophy occurs during the earliest phases of MS and suggest that 1 year longitudinal measures of MRI change, if considered together with baseline MRI variables, might help to predict clinical status 6 years after the first demyelinating event in CIS patients, better than measurements such as lesion or brain volumes on baseline MRI alone.

  3. DSN Scheduling Engine

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Johnston, Mark; Wax, Allan; Chouinard, Caroline

    2008-01-01

    The DSN (Deep Space Network) Scheduling Engine targets all space missions that use DSN services. It allows clients to issue scheduling, conflict identification, conflict resolution, and status requests in XML over a Java Message Service interface. The scheduling requests may include new requirements that represent a set of tracks to be scheduled under some constraints. This program uses a heuristic local search to schedule a variety of schedule requirements, and is being infused into the Service Scheduling Assembly, a mixed-initiative scheduling application. The engine resolves conflicting schedules of resource allocation according to a range of existing and possible requirement specifications, including optional antennas; start of track and track duration ranges; periodic tracks; locks on track start, duration, and allocated antenna; MSPA (multiple spacecraft per aperture); arraying/VLBI (very long baseline interferometry)/delta DOR (differential one-way ranging); continuous tracks; segmented tracks; gap-to-track ratio; and override or block-out of requirements. The scheduling models now include conflict identification for SOA(start of activity), BOT (beginning of track), RFI (radio frequency interference), and equipment constraints. This software will search through all possible allocations while providing a best-effort solution at any time. The engine reschedules to accommodate individual emergency tracks in 0.2 second, and emergency antenna downtime in 0.2 second. The software handles doubling of one mission's track requests over one week (to 42 total) in 2.7 seconds. Further tests will be performed in the context of actual schedules.

  4. Continental hydrology loading observed by VLBI measurements

    NASA Astrophysics Data System (ADS)

    Eriksson, David; MacMillan, D. S.

    2014-07-01

    Variations in continental water storage lead to loading deformation of the crust with typical peak-to-peak variations at very long baseline interferometry (VLBI) sites of 3-15 mm in the vertical component and 1-2 mm in the horizontal component. The hydrology signal at VLBI sites has annual and semi-annual components and clear interannual variations. We have calculated the hydrology loading series using mass loading distributions derived from the global land data assimilation system (GLDAS) hydrology model and alternatively from a global grid of equal-area gravity recovery and climate experiment (GRACE) mascons. In the analysis of the two weekly VLBI 24-h R1 and R4 network sessions from 2003 to 2010 the baseline length repeatabilities are reduced in 79 % (80 %) of baselines when GLDAS (GRACE) loading corrections are applied. Site vertical coordinate repeatabilities are reduced in about 80 % of the sites when either GLDAS or GRACE loading is used. In the horizontal components, reduction occurs in 70-80 % of the sites. Estimates of the annual site vertical amplitudes were reduced for 16 out of 18 sites if either loading series was applied. We estimated loading admittance factors for each site and found that the average admittances were 1.01 0.05 for GRACE and 1.39 0.07 for GLDAS. The standard deviations of the GRACE admittances and GLDAS admittances were 0.31 and 0.68, respectively. For sites that have been observed in a set of sufficiently temporally dense daily sessions, the average correlation between VLBI vertical monthly averaged series and GLDAS or GRACE loading series was 0.47 and 0.43, respectively.

  5. Exploiting Vector and Multicore Parallelsim for Recursive, Data- and Task-Parallel Programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ren, Bin; Krishnamoorthy, Sriram; Agrawal, Kunal

    Modern hardware contains parallel execution resources that are well-suited for data-parallelism-vector units-and task parallelism-multicores. However, most work on parallel scheduling focuses on one type of hardware or the other. In this work, we present a scheduling framework that allows for a unified treatment of task- and data-parallelism. Our key insight is an abstraction, task blocks, that uniformly handles data-parallel iterations and task-parallel tasks, allowing them to be scheduled on vector units or executed independently as multicores. Our framework allows us to define schedulers that can dynamically select between executing task- blocks on vector units or multicores. We show that thesemore » schedulers are asymptotically optimal, and deliver the maximum amount of parallelism available in computation trees. To evaluate our schedulers, we develop program transformations that can convert mixed data- and task-parallel pro- grams into task block-based programs. Using a prototype instantiation of our scheduling framework, we show that, on an 8-core system, we can simultaneously exploit vector and multicore parallelism to achieve 14×-108× speedup over sequential baselines.« less

  6. Message Mode Operations for Spacecraft: A Proposal for Operating Spacecraft During Cruise and Mitigating the Network Loading Crunch

    NASA Technical Reports Server (NTRS)

    Greenberg, Ed; MacMedan, Marv; Kazz, Greg; Kallemeyn, Pieter

    2000-01-01

    The NASA Deep Space Network (DSN) is a world-class spacecraft tracking facility with stations located in Spain, Australia and USA, servicing Deep Space Missions of many space agencies. The current system of scheduling spacecraft during cruise for multiple 8 hour tracking sessions per week currently leads to an overcommitted DSN. Studies indicate that future projected mission demands upon the Network will only make the loading problem worse. Therefore, a more efficient scheduling of DSN resources is necessary in order to support the additional network loading envisioned in the next few years: The number of missions is projected to increase from 25 in 1998 to 34 by 2001. In fact given the challenge of the NASA administrator, Dan Goldin, of launching 12 spacecraft per year, the DSN would be tracking approximately 90 spacecraft by 2010. Currently a large amount of antenna time and network resources are subscribed by a project in order to have their mission supported during the cruise phase. The recently completed Mars Pathfinder mission was tracked 3 times a week (8 hours/day) during the majority of its cruise to Mars. This paper proposes an innovative approach called Message Mode Operations (MMO) for mitigating the Network loading problem while continuing to meet the tracking, reporting, time management, and scheduling requirements of these missions during Cruise while occupying very short tracking times. MMO satisfies these requirements by providing the following services: Spacecraft Health and Welfare Monitoring Service Command Delivery Service Adaptive Spacecraft Scheduling Service Orbit Determination Service Time Calibration Service Utilizing more efficient engineering telemetry summarization and filtering techniques on-board the spacecraft and collapsing the navigation requirements for Doppler and Range into shorter tracks, we believe spacecraft can be adequately serviced using short 10 to 30 minute tracking sessions. This claim assumes that certain changes would have to he made in the way the Network traditionally services missions in Cruise. Furthermore, limiting spacecraft to short sessions will free up larger blocks of time in the tracking schedule to help accommodate future tracking demands soon to be placed upon the Network. This paper describes the key characteristics and benefits of MMO, the operational scenarios for its use, the required changes to the ground system in order to make this approach feasible and the results of two simulations: 1) to determine the effects of MMO on projected mission loading on the DSN and, 2) to determine the effect MMO has on spacecraft orbit determination.

  7. Hybrid scheduling mechanisms for Next-generation Passive Optical Networks based on network coding

    NASA Astrophysics Data System (ADS)

    Zhao, Jijun; Bai, Wei; Liu, Xin; Feng, Nan; Maier, Martin

    2014-10-01

    Network coding (NC) integrated into Passive Optical Networks (PONs) is regarded as a promising solution to achieve higher throughput and energy efficiency. To efficiently support multimedia traffic under this new transmission mode, novel NC-based hybrid scheduling mechanisms for Next-generation PONs (NG-PONs) including energy management, time slot management, resource allocation, and Quality-of-Service (QoS) scheduling are proposed in this paper. First, we design an energy-saving scheme that is based on Bidirectional Centric Scheduling (BCS) to reduce the energy consumption of both the Optical Line Terminal (OLT) and Optical Network Units (ONUs). Next, we propose an intra-ONU scheduling and an inter-ONU scheduling scheme, which takes NC into account to support service differentiation and QoS assurance. The presented simulation results show that BCS achieves higher energy efficiency under low traffic loads, clearly outperforming the alternative NC-based Upstream Centric Scheduling (UCS) scheme. Furthermore, BCS is shown to provide better QoS assurance.

  8. Apparatuses and methods of determining if a person operating equipment is experiencing an elevated cognitive load

    DOEpatents

    Watkins, Michael L.; Keller, Paul Edwin; Amaya, Ivan A.

    2015-06-16

    A method of, and apparatus for, determining if a person operating equipment is experiencing an elevated cognitive load, wherein the person's use of a device at a first time is monitored so as to set a baseline signature. Then, at a later time, the person's use of the device is monitored to determine the person's performance at the second time, as represented by a performance signature. This performance signature can then be compared against the baseline signature to predict whether the person is experiencing an elevated cognitive load.

  9. The effect of insulated combustion chamber surfaces on direct-injected diesel engine performance, emissions, and combustion

    NASA Technical Reports Server (NTRS)

    Dickey, Daniel W.; Vinyard, Shannon; Keribar, Rifat

    1988-01-01

    The combustion chamber of a single-cylinder, direct-injected diesel engine was insulated with ceramic coatings to determine the effect of low heat rejection (LHR) operation on engine performance, emissions, and combustion. In comparison to the baseline cooled engine, the LHR engine had lower thermal efficiency, with higher smoke, particulate, and full load carbon monoxide emissions. The unburned hydrocarbon emissions were reduced across the load range. The nitrous oxide emissions increased at some part-load conditions and were reduced slightly at full loads. The poor LHR engine performance was attributed to degraded combustion characterized by less premixed burning, lower heat release rates, and longer combustion duration compared to the baseline cooled engine.

  10. The role of fracture mechanics in the design of fuel tanks in space vehicles

    NASA Technical Reports Server (NTRS)

    Denton, S. J.; Liu, C. K.

    1976-01-01

    With special reference to design of fuel tanks in space vehicles, the principles of fracture mechanics are reviewed. An approximate but extremely simple relationship is derived among the operating stress level, the length of crack, and the number of cycles of failure. Any one of the variables can be computed approximately from the knowledge of the other two, if the loading schedule (mission of the tank) is not greatly altered. Two sample examples illustrating the procedures of determining the allowable safe operating stress corresponding to a set of assumed loading schedule are included. The selection of sample examples is limited by the relatively meager available data on the candidate material for various stress ratios in the cycling.

  11. 40 CFR 86.129-94 - Road load power, test weight, inertia weight class determination, and fuel temperature profile.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... specified driving schedule. The design of the laboratory facility should include consideration of any parameters that may affect fuel temperatures, such as solar loading, pavement heat, and relative wind... be at least 125 °F throughout the driving period. Pavement temperature shall be measured and recorded...

  12. 40 CFR 86.129-94 - Road load power, test weight, inertia weight class determination, and fuel temperature profile.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... specified driving schedule. The design of the laboratory facility should include consideration of any parameters that may affect fuel temperatures, such as solar loading, pavement heat, and relative wind... be at least 125 °F throughout the driving period. Pavement temperature shall be measured and recorded...

  13. 40 CFR 86.129-94 - Road load power, test weight, inertia weight class determination, and fuel temperature profile.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... specified driving schedule. The design of the laboratory facility should include consideration of any parameters that may affect fuel temperatures, such as solar loading, pavement heat, and relative wind... be at least 125 °F throughout the driving period. Pavement temperature shall be measured and recorded...

  14. 40 CFR 86.129-94 - Road load power, test weight, inertia weight class determination, and fuel temperature profile.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... specified driving schedule. The design of the laboratory facility should include consideration of any parameters that may affect fuel temperatures, such as solar loading, pavement heat, and relative wind... be at least 125 °F throughout the driving period. Pavement temperature shall be measured and recorded...

  15. 40 CFR 86.129-94 - Road load power, test weight, inertia weight class determination, and fuel temperature profile.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... specified driving schedule. The design of the laboratory facility should include consideration of any parameters that may affect fuel temperatures, such as solar loading, pavement heat, and relative wind... be at least 125 °F throughout the driving period. Pavement temperature shall be measured and recorded...

  16. Middle cerebral artery blood flow velocity during beach chair position for shoulder surgery under general anesthesia.

    PubMed

    Hanouz, Jean-Luc; Fiant, Anne-Lise; Gérard, Jean-Louis

    2016-09-01

    The goal of the present study was to examine changes of middle cerebral artery (VMCA) blood flow velocity in patients scheduled for shoulder surgery in beach chair position. Prospective observational study. Operating room, shoulder surgery. Fifty-three consecutive patients scheduled for shoulder surgery in beach chair position. Transcranial Doppler performed after induction of general anesthesia (baseline), after beach chair positioning (BC1), during surgery 20minutes (BC2), and after back to supine position before stopping anesthesia (supine). Mean arterial pressure (MAP), end-tidal CO2, and volatile anesthetic concentration and VMCA were recorded at baseline, BC1, BC2, and supine. Postoperative neurologic complications were searched. Beach chair position induced decrease in MAP (baseline: 73±10mm Hg vs lower MAP recorded: 61±10mm Hg; P<.0001) requiring vasopressors and fluid challenge in 44 patients (83%). There was a significant decrease in VMCA after beach chair positioning (BC1: 33±10cm/s vs baseline: 39±14cm/s; P=.001). The VMCA at baseline (39±2cm/s), BC2 (35±14cm/s), and supine (39±14cm/s) were not different. The minimal alveolar concentration of volatile anesthetics, end-tidal CO2, SpO2, and MAP were not different at baseline, BC1, BC2, and supine. Beach chair position resulted in transient decrease in MAP requiring fluid challenge and vasopressors and a moderate decrease in VMCA. Copyright © 2016 Elsevier Inc. All rights reserved.

  17. Processing and characterization of unidirectional thermoplastic nanocomposites

    NASA Astrophysics Data System (ADS)

    Narasimhan, Kameshwaran

    The manufacture of continuous fibre-reinforced thermoplastic nanocomposites is discussed for the case of E-Glass reinforced polypropylene (PP) matrix and for E-Glass reinforced Polyamide-6 (Nylon-6), with and without dispersed nanoclay (montmorillonite) platelets. The E-Glass/PP nanocomposite was manufactured using pultrusion, whereas the E-Glass/Nylon-6 nanocomposite was manufactured using compression molding. Mechanical characterization of nanocomposites were performed and compared with traditional microcomposites. Compressive as well as shear strength of nanocomposites was improved by improving the yield strength of the surrounding matrix through the dispersion of nanoclay. Significant improvements were achieved in compressive strength and shear strength with relatively low nanoclay loadings. Initially, polypropylene with and without nanoclay were melt intercalated using a single-screw extruder and the pultruded nanocomposite was fabricated using extruded pre-impregnated (pre-preg) tapes. Compression tests were performed as mandated by ASTM guidelines. SEM and TEM characterization revealed presence of nanoclay in an intercalated and partially exfoliated morphology. Mechanical tests confirmed significant improvements in compressive strength (˜122% at 10% nanoclay loading) and shear strength (˜60% at 3% nanoclay loading) in modified pultruded E-Glass/PP nanocomposites in comparison with baseline properties. Uniaxial tensile tests showed a small increase in tensile strength (˜3.4%) with 3% nanoclay loading. Subsequently, E-Glass/Nylon-6 nanocomposite panels were manufactured by compression molding. Compression tests were performed according to IITRI guidelines, whereas short beam shear and uni-axial tensile tests were performed according to ASTM standards. Mechanical tests confirmed strength enhancement with nanoclay addition, with a significant improvement in compressive strength (50% at 4% nanoclay loading) and shear strength (˜36% at 4% nanoclay loading) when compared with the baseline E-Glass/Nylon-6. Uni-axial tensile tests resulted in a small increase in tensile strength (˜3.2%) with 4% nanoclay loading. Also, hygrothermal aging (50°C and 100% RH) of baseline and nanoclay modified (4%) E-Glass/Nylon-6 was studied. It was observed that the moisture diffusion process followed Fickian diffusion. E-Glass/Nylon-6 modified with 4% nanoclay loading showed improved barrier performance with a significant reduction (˜30%) in moisture uptake compared to baseline E-Glass/Nylon-6 composites. Significant improvement in mechanical properties was also observed in hygrothermally aged nanocomposite specimens when compared with the aged baseline composite.

  18. Automated wind load characterization of wind turbine structures by embedded model updating

    NASA Astrophysics Data System (ADS)

    Swartz, R. Andrew; Zimmerman, Andrew T.; Lynch, Jerome P.

    2010-04-01

    The continued development of renewable energy resources is for the nation to limit its carbon footprint and to enjoy independence in energy production. Key to that effort are reliable generators of renewable energy sources that are economically competitive with legacy sources. In the area of wind energy, a major contributor to the cost of implementation is large uncertainty regarding the condition of wind turbines in the field due to lack of information about loading, dynamic response, and fatigue life of the structure expended. Under favorable circumstances, this uncertainty leads to overly conservative designs and maintenance schedules. Under unfavorable circumstances, it leads to inadequate maintenance schedules, damage to electrical systems, or even structural failure. Low-cost wireless sensors can provide more certainty for stakeholders by measuring the dynamic response of the structure to loading, estimating the fatigue state of the structure, and extracting loading information from the structural response without the need of an upwind instrumentation tower. This study presents a method for using wireless sensor networks to estimate the spectral properties of a wind turbine tower loading based on its measured response and some rudimentary knowledge of its structure. Structural parameters are estimated via model-updating in the frequency domain to produce an identification of the system. The updated structural model and the measured output spectra are then used to estimate the input spectra. Laboratory results are presented indicating accurate load characterization.

  19. Switching from oral extended-release methylphenidate to the methylphenidate transdermal system: continued ADHD symptom control and tolerability after abrupt conversion

    PubMed Central

    Arnold, L. E.; Hodgkins, P.; McKay, M.; Beckett-Thurman, L.; Greenbaum, M.; Bukstein, O.; Patel, A.; Bozzolo, D. R.

    2013-01-01

    Objective To evaluate symptom control and tolerability after abrupt conversion from oral extended-release methylphenidate (ER-MPH) to methylphenidate transdermal system (MTS) via a dose-transition schedule in children with attention-deficit/hyperactivity disorder (ADHD). Methods In a 4-week, prospective, multisite, open-label study, 171 children (164 intent-to-treat) with diagnosed ADHD aged 6–12 years abruptly switched from a stable dose of oral ER-MPH to MTS in nominal dosages of 10, 15, 20, and 30 mg using a predefined dose-transition schedule. After the first week on the scheduled dose, the dose was titrated to optimal effect. The primary effectiveness outcome was the change from baseline (while taking ER-MPH) to week 4 in ADHD-Rating Scale-IV (ADHD-RS-IV) total scores. Adverse events (AEs) were assessed throughout the study. Results Most subjects (58%) remained on the initial MTS dose defined by the dose-transition schedule; 38% increased and 4% decreased their MTS dose for optimization. MTS dose optimization resulted in significantly better ADHD-RS-IV total (mean ± SD) scores at week 4 than at baseline (9.9±7.47 vs 14.1±7.48; p<0.0001). The most commonly reported AEs included headache, decreased appetite, insomnia, and upper abdominal pain. Four subjects (2.3%) discontinued because of application site reactions and 3 discontinued because of other AEs. Conclusions Abrupt conversion from a stable dose of oral ER-MPH to MTS was accomplished using a predefined dose-transition schedule without loss of symptom control; however, careful titration to optimal dose is recommended. Most AEs were mild to moderate and, with the exception of application site reactions, were similar to AEs typically observed with oral MPH. Limitations of this study included its open-label sequential design without placebo, which could result in spurious attribution of improvement to the study treatment and precluded superiority determinations of MTS over baseline ER-MPH treatment. The apparent superiority of MTS was likely due to more careful titration and clinical monitoring rather than the product itself. NCT NCT00151983 PMID:19916704

  20. Kinetic studies of the stress corrosion cracking of D6AC steel

    NASA Technical Reports Server (NTRS)

    Noronha, P. J.

    1975-01-01

    The effect of load interactions on the crack growth velocity of D6AC steel under stress corrosion cracking conditions was determined. The environment was a 3.5 percent salt solution. The modified-wedge opening load specimens were fatigue precracked and subjected to a deadweight loading in creep machines. The effects of load shedding on incubation times and crack growth rates were measured using high-sensitivity compliance measurement techniques. Load shedding results in an incubation time, the length of which depends on the amount of load shed and the baseline stress intensity. The sequence of unloading the specimen also controls the subsequent incubation period. The incubation period is shorter when load shedding passes through zero load than when it does not if the specimen initially had the same baseline stress intensity. The crack growth rates following the incubation period are also different from the steady-state crack growth rate at the operating stress intensity. These data show that the susceptibility of this alloy system to stress corrosion cracking depends on the plane-strain fracture toughness and on the yield strength of the material.

  1. System and method for optimal load and source scheduling in context aware homes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shetty, Pradeep; Foslien Graber, Wendy; Mangsuli, Purnaprajna R.

    A controller for controlling energy consumption in a home includes a constraints engine to define variables for multiple appliances in the home corresponding to various home modes and persona of an occupant of the home. A modeling engine models multiple paths of energy utilization of the multiple appliances to place the home into a desired state from a current context. An optimal scheduler receives the multiple paths of energy utilization and generates a schedule as a function of the multiple paths and a selected persona to place the home in a desired state.

  2. WindPACT Reference Wind Turbines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dykes, Katherine L; Rinker, Jennifer

    To fully understand how loads and turbine cost scale with turbine size, it is necessary to have identical turbine models that have been scaled to different rated powers. The report presents the WindPACT baseline models, which are a series of four baseline models that were designed to facilitate investigations into the scalings of loads and turbine cost with size. The models have four different rated powers (750 kW, 1.5 MW, 3.0 MW, and 5.0 MW), and each model was designed to its specified rated power using the same design methodology. The models were originally implemented in FAST_AD, the predecessor tomore » NREL's open-source wind turbine simulator FAST, but have yet to be implemented in FAST. This report contains the specifications for all four WindPACT baseline models - including structural, aerodynamic, and control specifications - along with the inherent assumptions and equations that were used to calculate the model parameters. It is hoped that these baseline models will serve as extremely useful resources for investigations into the scalings of costs, loads, or optimization routines.« less

  3. 2013 White Book, Pacific Northwest Loads and Resources Study (summary)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The 2013 Pacific Northwest Loads and Resources Study (2013 White Book) is BPA's latest projection of the Pacific Northwest regional retail loads, contract obligations, contract purchases, and resource capabilities. The 2013 White Book is a snapshot of conditions as of October 1, 2013, documenting the loads and resources for the Federal system and region for the 10-year study period OY 2014 through 2023. The White Book contains projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. The White Book also contains information obtained from formalized resource planning reports and data submittals including thosemore » from individual utilities, the Northwest Power and Conservation Council (Council), and the Pacific Northwest Utilities Conference Committee (PNUCC). Starting with the 2012 White Book, BPA changed the annual production schedule for future White Books. BPA is scheduled to publish a complete White Book, which includes a Federal System Needs Assessment analysis, every other year (even years). In the odd-numbered years, BPA will publish a biennial summary update (Supplement) that only contains major changes to the Federal System and Regional System analyses that have occurred since the last White Book. http://www.bpa.gov/power/pgp/whitebook/2013/index.shtml.« less

  4. Population-based learning of load balancing policies for a distributed computer system

    NASA Technical Reports Server (NTRS)

    Mehra, Pankaj; Wah, Benjamin W.

    1993-01-01

    Effective load-balancing policies use dynamic resource information to schedule tasks in a distributed computer system. We present a novel method for automatically learning such policies. At each site in our system, we use a comparator neural network to predict the relative speedup of an incoming task using only the resource-utilization patterns obtained prior to the task's arrival. Outputs of these comparator networks are broadcast periodically over the distributed system, and the resource schedulers at each site use these values to determine the best site for executing an incoming task. The delays incurred in propagating workload information and tasks from one site to another, as well as the dynamic and unpredictable nature of workloads in multiprogrammed multiprocessors, may cause the workload pattern at the time of execution to differ from patterns prevailing at the times of load-index computation and decision making. Our load-balancing policy accommodates this uncertainty by using certain tunable parameters. We present a population-based machine-learning algorithm that adjusts these parameters in order to achieve high average speedups with respect to local execution. Our results show that our load-balancing policy, when combined with the comparator neural network for workload characterization, is effective in exploiting idle resources in a distributed computer system.

  5. A new distributed systems scheduling algorithm: a swarm intelligence approach

    NASA Astrophysics Data System (ADS)

    Haghi Kashani, Mostafa; Sarvizadeh, Raheleh; Jameii, Mahdi

    2011-12-01

    The scheduling problem in distributed systems is known as an NP-complete problem, and methods based on heuristic or metaheuristic search have been proposed to obtain optimal and suboptimal solutions. The task scheduling is a key factor for distributed systems to gain better performance. In this paper, an efficient method based on memetic algorithm is developed to solve the problem of distributed systems scheduling. With regard to load balancing efficiently, Artificial Bee Colony (ABC) has been applied as local search in the proposed memetic algorithm. The proposed method has been compared to existing memetic-Based approach in which Learning Automata method has been used as local search. The results demonstrated that the proposed method outperform the above mentioned method in terms of communication cost.

  6. Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Makarov, Yuri V.; Huang, Zhenyu; Etingov, Pavel V.

    2010-01-01

    The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the loadmore » and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.« less

  7. Wind Energy Management System Integration Project Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Makarov, Yuri V.; Huang, Zhenyu; Etingov, Pavel V.

    2010-09-01

    The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation) and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and windmore » forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. In order to improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively, by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. In this report, a new methodology to predict the uncertainty ranges for the required balancing capacity, ramping capability and ramp duration is presented. Uncertainties created by system load forecast errors, wind and solar forecast errors, generation forced outages are taken into account. The uncertainty ranges are evaluated for different confidence levels of having the actual generation requirements within the corresponding limits. The methodology helps to identify system balancing reserve requirement based on a desired system performance levels, identify system “breaking points”, where the generation system becomes unable to follow the generation requirement curve with the user-specified probability level, and determine the time remaining to these potential events. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (California ISO) real life data have shown the effectiveness of the proposed approach. A tool developed based on the new methodology described in this report will be integrated with the California ISO systems. Contractual work is currently in place to integrate the tool with the AREVA EMS system.« less

  8. Adaptive Multilevel Middleware for Object Systems

    DTIC Science & Technology

    2006-12-01

    the system at the system-call level or using the CORBA-standard Extensible Transport Framework ( ETF ). Transparent insertion is highly desirable from an...often as it needs to. This is remedied by using the real-time scheduling class in a stock Linux kernel. We used schedsetscheduler system call (with...real-time scheduling class (SCHEDFIFO) for all the ML-NFD programs, later experiments with CPU load indicate that a stock Linux kernel is not

  9. Time pressure and attention allocation effect on upper limb motion steadiness.

    PubMed

    Liu, Sicong; Eklund, Robert C; Tenenbaum, Gershon

    2015-01-01

    Following ironic process theory (IPT), the authors aimed at investigating how attentional allocation affects participants' upper limb motion steadiness under low and high levels of mental load. A secondary purpose was to examine the validity of skin conductance level in measuring perception of pressure. The study consisted of 1 within-participant factor (i.e., phase: baseline, test) and 4 between-participant factors (i.e., gender: male, female; mental load: fake time constraints, no time constraints; attention: positive, suppressive; order: baseline → → → test, test → → baseline). Eighty college students (40 men and 40 women, Mage = 20.20 years, SD(age) = 1.52 years) participated in the study. Gender-stratified random assignment was employed in a 2 × 2 × 2 × 2 × 2 mixed experimental design. The findings generally support IPT but its predictions on motor performance under mental load may not be entirely accurate. Unlike men, women's performance was not susceptible to manipulations of mental load and attention allocation. The validity of skin conductance readings as an index of pressure perception was called into question.

  10. Aeroelastic considerations for torsionally soft rotors

    NASA Technical Reports Server (NTRS)

    Mantay, W. R.; Yeager, W. T., Jr.

    1986-01-01

    A research study was initiated to systematically determine the impact of selected blade tip geometric parameters on conformable rotor performance and loads characteristics. The model articulated rotors included baseline and torsionally soft blades with interchangeable tips. Seven blade tip designs were evaluated on the baseline rotor and six tip designs were tested on the torsionally soft blades. The designs incorporated a systemmatic variation in geometric parameters including sweep, taper, and anhedral. The rotors were evaluated in the NASA Langley Transonic Dynamics Tunnel at several advance ratios, lift and propulsive force values, and tip Mach numbers. A track sensitivity study was also conducted at several advance ratios for both rotors. Based on the test results, tip parameter variations generated significant rotor performance and loads differences for both baseline and torsionally soft blades. Azimuthal variation of elastic twist generated by variations in the tip parameters strongly correlated with rotor performance and loads, but the magnitude of advancing blade elastic twist did not. In addition, fixed system vibratory loads and rotor track for potential conformable rotor candidates appears very sensitive to parametric rotor changes.

  11. Improvement to Airport Throughput Using Intelligent Arrival Scheduling and an Expanded Planning Horizon

    NASA Technical Reports Server (NTRS)

    Glaab, Patricia C.

    2012-01-01

    The first phase of this study investigated the amount of time a flight can be delayed or expedited within the Terminal Airspace using only speed changes. The Arrival Capacity Calculator analysis tool was used to predict the time adjustment envelope for standard descent arrivals and then for CDA arrivals. Results ranged from 0.77 to 5.38 minutes. STAR routes were configured for the ACES simulation, and a validation of the ACC results was conducted comparing the maximum predicted time adjustments to those seen in ACES. The final phase investigated full runway-to-runway trajectories using ACES. The radial distance used by the arrival scheduler was incrementally increased from 50 to 150 nautical miles (nmi). The increased Planning Horizon radii allowed the arrival scheduler to arrange, path stretch, and speed-adjust flights to more fully load the arrival stream. The average throughput for the high volume portion of the day increased from 30 aircraft per runway for the 50 nmi radius to 40 aircraft per runway for the 150 nmi radius for a traffic set representative of high volume 2018. The recommended radius for the arrival scheduler s Planning Horizon was found to be 130 nmi, which allowed more than 95% loading of the arrival stream.

  12. Scheduling based on a dynamic resource connection

    NASA Astrophysics Data System (ADS)

    Nagiyev, A. E.; Botygin, I. A.; Shersntneva, A. I.; Konyaev, P. A.

    2017-02-01

    The practical using of distributed computing systems associated with many problems, including troubles with the organization of an effective interaction between the agents located at the nodes of the system, with the specific configuration of each node of the system to perform a certain task, with the effective distribution of the available information and computational resources of the system, with the control of multithreading which implements the logic of solving research problems and so on. The article describes the method of computing load balancing in distributed automatic systems, focused on the multi-agency and multi-threaded data processing. The scheme of the control of processing requests from the terminal devices, providing the effective dynamic scaling of computing power under peak load is offered. The results of the model experiments research of the developed load scheduling algorithm are set out. These results show the effectiveness of the algorithm even with a significant expansion in the number of connected nodes and zoom in the architecture distributed computing system.

  13. A derived heuristics based multi-objective optimization procedure for micro-grid scheduling

    NASA Astrophysics Data System (ADS)

    Li, Xin; Deb, Kalyanmoy; Fang, Yanjun

    2017-06-01

    With the availability of different types of power generators to be used in an electric micro-grid system, their operation scheduling as the load demand changes with time becomes an important task. Besides satisfying load balance constraints and the generator's rated power, several other practicalities, such as limited availability of grid power and restricted ramping of power output from generators, must all be considered during the operation scheduling process, which makes it difficult to decide whether the optimization results are accurate and satisfactory. In solving such complex practical problems, heuristics-based customized optimization algorithms are suggested. However, due to nonlinear and complex interactions of variables, it is difficult to come up with heuristics in such problems off-hand. In this article, a two-step strategy is proposed in which the first task deciphers important heuristics about the problem and the second task utilizes the derived heuristics to solve the original problem in a computationally fast manner. Specifically, the specific operation scheduling is considered from a two-objective (cost and emission) point of view. The first task develops basic and advanced level knowledge bases offline from a series of prior demand-wise optimization runs and then the second task utilizes them to modify optimized solutions in an application scenario. Results on island and grid connected modes and several pragmatic formulations of the micro-grid operation scheduling problem clearly indicate the merit of the proposed two-step procedure.

  14. STS-58 crewmembers participate in baseline data collection

    NASA Image and Video Library

    1993-09-29

    S93-45364 (29 Sept 1993) --- Astronaut David A. Wolf, mission specialist, participates in pre-flight data collection for the cardiovascular experiments scheduled to fly aboard Columbia for the Spacelab Life Sciences (SLS-2) mission.

  15. Incentive-compatible demand-side management for smart grids based on review strategies

    NASA Astrophysics Data System (ADS)

    Xu, Jie; van der Schaar, Mihaela

    2015-12-01

    Demand-side load management is able to significantly improve the energy efficiency of smart grids. Since the electricity production cost depends on the aggregate energy usage of multiple consumers, an important incentive problem emerges: self-interested consumers want to increase their own utilities by consuming more than the socially optimal amount of energy during peak hours since the increased cost is shared among the entire set of consumers. To incentivize self-interested consumers to take the socially optimal scheduling actions, we design a new class of protocols based on review strategies. These strategies work as follows: first, a review stage takes place in which a statistical test is performed based on the daily prices of the previous billing cycle to determine whether or not the other consumers schedule their electricity loads in a socially optimal way. If the test fails, the consumers trigger a punishment phase in which, for a certain time, they adjust their energy scheduling in such a way that everybody in the consumer set is punished due to an increased price. Using a carefully designed protocol based on such review strategies, consumers then have incentives to take the socially optimal load scheduling to avoid entering this punishment phase. We rigorously characterize the impact of deploying protocols based on review strategies on the system's as well as the users' performance and determine the optimal design (optimal billing cycle, punishment length, etc.) for various smart grid deployment scenarios. Even though this paper considers a simplified smart grid model, our analysis provides important and useful insights for designing incentive-compatible demand-side management schemes based on aggregate energy usage information in a variety of practical scenarios.

  16. White Paper on SBUV/2 Solar Irradiance Measurements

    NASA Technical Reports Server (NTRS)

    Hilsenrath, Ernest; DeLand, Matthew T.; Cebula, Richard P.

    1996-01-01

    The importance of solar irradiance measurements by the Solar Backscatter Ultraviolet, Model 2 (SBUV/2) instruments on NOAA's operational satellites is described. These measurements are necessary accurately monitor the long-term changes in the global column ozone amount, the altitude distribution of ozone in the upper stratosphere, and the degree to which ozone changes are caused by anthropogenic sources. Needed to accomplish these goals are weekly solar irradiance measurements at the operational ozone wavelengths, daily measurements of the Mg II proxy index, instrument-specific Mg II scale factors, and daily measurements of the solar spectral irradiance at photochemically important wavelengths. Two solar measurement schedules are provided: (1) a baseline schedule for all instruments except the NOAA-14 instrument and (2) a modified schedule for the NOAA-14 SBUV/2 instrument. This latter schedule is needed due to the NOAA-14 grating drive problems.

  17. Treating Non-Retentive Encopresis with Rewarded Scheduled Toilet Visits

    PubMed Central

    Boles, Richard E; Roberts, Michael C; Vernberg, Eric M

    2008-01-01

    We evaluated the effects of rewarded scheduled toilet sits on non-retentive encopretic behavior of an elementary-school student receiving services for serious emotional disturbance. A multidisciplinary team implemented the 8-week intervention using a multiple baseline across settings design. The results showed an increase in sitting on the toilet and a decline in encopretic episodes in both school and home settings. These findings support the use of a behavioral intervention for children with significant behavioral disorders within a classroom setting. PMID:22477690

  18. Runway Scheduling Using Generalized Dynamic Programming

    NASA Technical Reports Server (NTRS)

    Montoya, Justin; Wood, Zachary; Rathinam, Sivakumar

    2011-01-01

    A generalized dynamic programming method for finding a set of pareto optimal solutions for a runway scheduling problem is introduced. The algorithm generates a set of runway fight sequences that are optimal for both runway throughput and delay. Realistic time-based operational constraints are considered, including miles-in-trail separation, runway crossings, and wake vortex separation. The authors also model divergent runway takeoff operations to allow for reduced wake vortex separation. A modeled Dallas/Fort Worth International airport and three baseline heuristics are used to illustrate preliminary benefits of using the generalized dynamic programming method. Simulated traffic levels ranged from 10 aircraft to 30 aircraft with each test case spanning 15 minutes. The optimal solution shows a 40-70 percent decrease in the expected delay per aircraft over the baseline schedulers. Computational results suggest that the algorithm is promising for real-time application with an average computation time of 4.5 seconds. For even faster computation times, two heuristics are developed. As compared to the optimal, the heuristics are within 5% of the expected delay per aircraft and 1% of the expected number of runway operations per hour ad can be 100x faster.

  19. Effects of an exercise and scheduled-toileting intervention on appetite and constipation in nursing home residents.

    PubMed

    Simmons, S F; Schnelle, J F

    2004-01-01

    To evaluate the effects of an exercise and scheduled-toileting intervention on appetite and constipation in nursing home (NH) residents. A controlled, clinical intervention trial with 89 residents in two NHs. Research staff provided exercise and toileting assistance every two hours, four times per day, five days a week for 32 weeks. Oral food and fluid consumption during meals was measured at baseline, eight and 32 weeks. Bowel movement frequency was measured at baseline and 32 weeks. The intervention group showed significant improvements or maintenance across all measures of daily physical activity, functional performance, and strength compared to the control group. Participants in both groups consumed an average of approximately 55% of meals at all three time points (approximately 1100 calories/day) with no change over time in either group. There was also no change in the frequency of bowel movements in either group, which averaged less than one in two days for both groups; and, approximately one-half of all participants had no bowel movement in two days. An exercise and scheduled-toileting intervention alone is not sufficient to improve oral food and fluid consumption during meals and bowel movement frequency in NH residents.

  20. Materials experiment carrier concepts definition study. Volume 3: Programmatics, part 2

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Project logic, schedule and funding information was derived to enable decisions to be made regarding implementation of MEC system development. A master schedule and cost and price estimates (ROM) were developed for a project that consists of development of an all-up MEC, its integration with payloads and its flight on one 90 day mission. In Part 2 of the study a simple initial MEC was defined to accommodate three MPS baseline payloads. The design of this initial MEC is illustrated. The project logic, detailed schedules, and ROM cost estimate relate to a project in which this initial MEC is developed, integrated with payloads and flown once for 180 days.

  1. A trial of scheduled deep brain stimulation for Tourette syndrome: moving away from continuous deep brain stimulation paradigms.

    PubMed

    Okun, Michael S; Foote, Kelly D; Wu, Samuel S; Ward, Herbert E; Bowers, Dawn; Rodriguez, Ramon L; Malaty, Irene A; Goodman, Wayne K; Gilbert, Donald M; Walker, Harrison C; Mink, Jonathan W; Merritt, Stacy; Morishita, Takashi; Sanchez, Justin C

    2013-01-01

    To collect the information necessary to design the methods and outcome variables for a larger trial of scheduled deep brain stimulation (DBS) for Tourette syndrome. We performed a small National Institutes of Health-sponsored clinical trials planning study of the safety and preliminary efficacy of implanted DBS in the bilateral centromedian thalamic region. The study used a cranially contained constant-current device and a scheduled, rather than the classic continuous, DBS paradigm. Baseline vs 6-month outcomes were collected and analyzed. In addition, we compared acute scheduled vs acute continuous vs off DBS. A university movement disorders center. Five patients with implanted DBS. A 50% improvement in the Yale Global Tic Severity Scale (YGTSS) total score. RESULTS Participating subjects had a mean age of 34.4 (range, 28-39) years and a mean disease duration of 28.8 years. No significant adverse events or hardware-related issues occurred. Baseline vs 6-month data revealed that reductions in the YGTSS total score did not achieve the prestudy criterion of a 50% improvement in the YGTSS total score on scheduled stimulation settings. However, statistically significant improvements were observed in the YGTSS total score (mean [SD] change, -17.8 [9.4]; P=.01), impairment score (-11.3 [5.0]; P=.007), and motor score (-2.8 [2.2]; P=.045); the Modified Rush Tic Rating Scale Score total score (-5.8 [2.9]; P=.01); and the phonic tic severity score (-2.2 [2.6]; P=.04). Continuous, off, and scheduled stimulation conditions were assessed blindly in an acute experiment at 6 months after implantation. The scores in all 3 conditions showed a trend for improvement. Trends for improvement also occurred with continuous and scheduled conditions performing better than the off condition. Tic suppression was commonly seen at ventral (deep) contacts, and programming settings resulting in tic suppression were commonly associated with a subjective feeling of calmness. This study provides safety and proof of concept that a scheduled DBS approach could improve motor and vocal tics in Tourette syndrome. Refinements in neurostimulator battery life, outcome measure selection, and flexibility in programming settings can be used to enhance outcomes in a future larger study. Scheduled stimulation holds promise as a potential first step for shifting movement and neuropsychiatric disorders toward more responsive neuromodulation approaches. clinicaltrials.gov Identifier: NCT01329198.

  2. Tool for Merging Proposals Into DSN Schedules

    NASA Technical Reports Server (NTRS)

    Khanampornpan, Teerapat; Kwok, John; Call, Jared

    2008-01-01

    A Practical Extraction and Reporting Language (Perl) script called merge7da has been developed to facilitate determination, by a project scheduler in NASA's Deep Space Network, of whether a proposal for use of the DSN could create a conflict with the current DSN schedule. Prior to the development of merge7da, there was no way to quickly identify potential schedule conflicts: it was necessary to submit a proposal and wait a day or two for a response from a DSN scheduling facility. By using merge7da to detect and eliminate potential schedule conflicts before submitting a proposal, a project scheduler saves time and gains assurance that the proposal will probably be accepted. merge7da accepts two input files, one of which contains the current DSN schedule and is in a DSN-standard format called '7da'. The other input file contains the proposal and is in another DSN-standard format called 'C1/C2'. merge7da processes the two input files to produce a merged 7da-format output file that represents the DSN schedule as it would be if the proposal were to be adopted. This 7da output file can be loaded into various DSN scheduling software tools now in use.

  3. Load dependence of left ventricular contraction and relaxation. Effects of caffeine.

    PubMed

    Leite-Moreira, A F; Correia-Pinto, J; Gillebert, T C

    1999-08-01

    Load dependence of left ventricular (LV) contraction and relaxation was investigated at baseline and after alteration of intracellular calcium handling by caffeine. Afterload was increased by aortic clamp occlusions (n = 281) in anesthetized open-chest dogs (n = 7). Control and first heartbeat after the intervention were considered for analysis. Caffeine (50 mg/kg, iv) had no inotropic effect. The systolic LV pressure (LVP), developed in response to aortic occlusion, decreased as ejection proceeded and this pressure generating capacity was not affected by caffeine. Late-systolic aortic occlusions induced premature onset and accelerated rate of initial LVP fall at baseline and similarly after caffeine. Graded diastolic aortic occlusions induced systolic LVP elevations of various magnitudes. Smaller LVP elevations prolonged ejection and accelerated LVP fall, while larger elevations had opposite effects. The transition from acceleration to deceleration was observed at 83.1 +/- 1.1% of peak isovolumetric LVP at baseline and at lower loads, at 77.6 +/- 1.2%, after caffeine (p < 0.01). Isovolumetric heartbeats prolonged the time constant tau by 238 +/- 70% at baseline and only by 155 +/- 44% after caffeine (p < 0.01). The relaxation-systolic pressure relation, which describes afterload dependence of relaxation, was also modified by caffeine. Caffeine affected LV relaxation without altering contractility. As a consequence contraction-relaxation coupling was modified by caffeine. These results might help to understand load dependence of relaxation in conditions where intracellular calcium handling is altered.

  4. Day-On, Day-Off emtricitabine, tenofovir disoproxil fumarate and efavirenz single tablet regimen (DODO) as maintenance therapy in HIV-infected patients.

    PubMed

    Costantini, Andrea; Tontini, Chiara; Rocchi, Monia; Martini, Matteo; Butini, Luca

    2018-06-01

    Reduced dose schedules may be feasible options to simplify antiretroviral therapy (ART) in selected HIV-1-infected individuals. Efficacy and safety of a Day-on, Day-off (DODO) schedule of tenofovir disoproxil fumarate, emtricitabine and efavirenz (FTC/TDF/EFV) single tablet regimen (STR) was assessed. Twenty-seven patients were prescribed the DODO schedule and were monitored for 48 weeks. Switching criteria were: no previous ART failure, no AIDS-defining illnesses, T CD4 cell nadir >200/mmc, and HIV-RNA below detection limit (40 copies/mL) for at least six months. Clinical and laboratory data, including plasma HIV-RNA levels, T CD4 and CD8 counts, liver and kidney function, lipid levels and ultrasensitive C-reactive protein (us-CRP) were assessed at baseline, week 4, 12, 24, and 48. Statistical analysis was performed by paired Student's T-test for comparison between baseline and each time point and Chi square test for CD4/CD8 ratio comparison. In all, 26 out of 27 patients maintained plasma HIV-RNA levels below the detection limit through the entire follow-up. One patient experienced low level plasma HIV-RNA rebound at week 36 (47 copies/ml) and immediately reverted to the conventional dose schedule of FTC/TDF/EFV; plasma HIV-RNA was undetectable after four weeks. No major changes on liver and kidney function tests, lipid levels and us-CRP were observed. Although no profound modifications of T CD4 count were observed during follow-up, the CD4/CD8 ratio increased significantly at week 48 compared to the baseline (p<0.05). In conclusion, 48-week DODO administration of the fixed dose FTC/TDF/EFV STR combination was safe and effective in maintaining HIV viral replication below the detection limit in a selected group of HIV-1-infected individuals.

  5. Preliminary Solar Sail Design and Fabrication Assessment: Spinning Sail Blade, Square Sail Sheet

    NASA Technical Reports Server (NTRS)

    Daniels, J. B.; Dowdle, D. M.; Hahn, D. W.; Hildreth, E. N.; Lagerquist, D. R.; Mahagnoul, E. J.; Munson, J. B.; Origer, T. F.

    1977-01-01

    The designs and fabrication methods, equipment, facilities, economics, and schedules, for the square sail sheet alternate are evaluated. The baseline for the spinning sail blade design and related fabrication issues are assessed.

  6. [Mental health in physicians doing the rural and suburban health service in Peru: a baseline study].

    PubMed

    Galán-Rodas, Edén; Gálvez-Buccollini, Juan Antonio; Vega-Galdós, Favio; Osada, Jorge; Guerrero-Padilla, Daisy; Vega-Dienstmaier, Johann; Talledo, Lety; Catacora, Manuel; Fiestas, Fabián

    2011-06-01

    The disadvantageous conditions in which young physicians have to do their rural and sub-urban health service (SERUMS) may put them in a high risk for mental disorders. This study aims to establish the baseline levels of depression and alcohol use problems among those physicians scheduled to complete their SERUMS during the period 2011-2012. The Center for Epidemiologic Studies Depression Scale (CES-D) and the Alcohol Use Disorders Identification Test (AUDIT) were administered as screening tests to 493 physicians. Depression scores were met by 26% females and 14.5% males, and alcohol use problem scores were met by 22% females and 26% males. Overall, 39% persons scored for either of both mental health entities. Mental health problems seem to be common among young physicians scheduled to migrate to their SERUMS. These problems must be addressed to avoid greater risks.

  7. Tests of an alternating current propulsion subsystem for electric vehicles on a road load simulator

    NASA Astrophysics Data System (ADS)

    Stenger, F. J.

    1982-12-01

    The test results of a breadboard version of an ac electric-vehicle propulsion subsystem are presented. The breadboard was installed in the NASA Lewis Research Center Road Load Simulator facility and tested under steady-state and transient conditions. Steady-state tests were run to characterize the system and component efficiencies over the complete speed-torque range within the capability of the propulsion subsystem in the motoring mode of operation. Transient tests were performed to determine the energy consumption of the breadboard over the acceleration and cruise portions of SAE J227 and driving schedules B, C, and D. Tests in the regenerative mode were limited to the low-gear-speed range of the two speed transaxle used in the subsystem. The maximum steady-state subsystem efficiency observed for the breadboard was 81.5 percent in the high-gear-speed range in the motoring mode, and 76 percent in the regenerative braking mode (low gear). The subsystem energy efficiency during the transient tests ranged from 49.2 percent for schedule B to 68.4 percent for Schedule D.

  8. Tests of an alternating current propulsion subsystem for electric vehicles on a road load simulator

    NASA Technical Reports Server (NTRS)

    Stenger, F. J.

    1982-01-01

    The test results of a breadboard version of an ac electric-vehicle propulsion subsystem are presented. The breadboard was installed in the NASA Lewis Research Center Road Load Simulator facility and tested under steady-state and transient conditions. Steady-state tests were run to characterize the system and component efficiencies over the complete speed-torque range within the capability of the propulsion subsystem in the motoring mode of operation. Transient tests were performed to determine the energy consumption of the breadboard over the acceleration and cruise portions of SAE J227 and driving schedules B, C, and D. Tests in the regenerative mode were limited to the low-gear-speed range of the two speed transaxle used in the subsystem. The maximum steady-state subsystem efficiency observed for the breadboard was 81.5 percent in the high-gear-speed range in the motoring mode, and 76 percent in the regenerative braking mode (low gear). The subsystem energy efficiency during the transient tests ranged from 49.2 percent for schedule B to 68.4 percent for Schedule D.

  9. Automated Platform Management System Scheduling

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1990-01-01

    The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our work and results may be outdated when this paper is published.

  10. Indoor air bacterial load and antibiotic susceptibility pattern of isolates in operating rooms and surgical wards at jimma university specialized hospital, southwest ethiopia.

    PubMed

    Genet, Chalachew; Kibru, Gebre; Tsegaye, Wondewosen

    2011-03-01

    Surgical site infection is the second most common health care associated infection. One of the risk factors for such infection is bacterial contamination of operating rooms' and surgical wards' indoor air. In view of that, the microbiological quality of air can be considered as a mirror of the hygienic condition of these rooms. Thus, the objective of this study was to determine the bacterial load and antibiotic susceptibility pattern of isolates in operating rooms' and surgical wards' indoor air of Jimma University Specialized Hospital. A cross sectional study was conducted to measure indoor air microbial quality of operating rooms and surgical wards from October to January 2009/2010 on 108 indoor air samples collected in twelve rounds using purposive sampling technique by Settle Plate Method (Passive Air Sampling following 1/1/1 Schedule). Sample processing and antimicrobial susceptibility testing were done following standard bacteriological techniques. The data was analyzed using SPSS version 16 and interpreted according to scientifically determined baseline values initially suggested by Fisher. The mean aerobic colony counts obtained in OR-1(46cfu/hr) and OR-2(28cfu/hr) was far beyond the set 5-8cfu/hr acceptable standards for passive room. Similarly the highest mean aerobic colony counts of 465cfu/hr and 461cfu/hr were observed in Female room-1 and room-2 respectively when compared to the acceptable range of 250-450cfu/hr. In this study only 3 isolates of S. pyogenes and 48 isolates of S. aureus were identified. Over 66% of S. aureus was identified in Critical Zone of Operating rooms. All isolates of S. aureus showed 100% and 82.8% resistance to methicillin and ampicillin respectively. Higher degree of aerobic bacterial load was measured from operating rooms' and surgical wards' indoor air. Reducing foot trafficking, improving the ventilation system and routine cleaning has to be made to maintain the aerobic bacteria load with in optimal level.

  11. Satisfaction and Clinical Outcomes Among Patients with Immediately Loaded Mandibular Overdentures Supported by One or Two Dental Implants: Results of a 5-Year Prospective Randomized Clinical Trial.

    PubMed

    Kronstrom, Mats; Davis, Ben; Loney, Robert; Gerrow, Jack; Hollender, Lars

    The purpose of this study was to evaluate patient satisfaction and clinical outcomes among subjects with mandibular overdentures supported by one or two immediately placed dental implants 5 years after loading. Thirty-six subjects (16 men and 20 women) received one or two dental implants in the anterior mandible, and all implants were loaded the day of surgery. Subjects were scheduled for follow-up 3-, 6-, and 12 months after implant placement and thereafter annually for 4 more years. Patient satisfaction scores were measured with the Oral Health Impact Profile-EDENT (OHIPEDENT) questionnaire. Seventeen subjects (7 male and 10 female) with a mean age of 59.4 years (range, 44 to 74 years) were available for the 5-year follow-up examination. Nine subjects with 10 failing implants were excluded during the first year and nine subjects were lost to follow-up. No implants failed between the 12- and 60-month follow-up examinations, and the need for denture maintenance was low. Mean peri-implant bone change was 0.92 mm, and the Spearman test failed to show correlation between the insertion torque value and implant stability quotient. Patient satisfaction scores increased significantly when compared with baseline values and continued to be high for both groups, with no significant differences. Ten implants in nine subjects failed early, but no failures were observed after the 12-month examination. No significant differences were found between subjects in the two groups with respect to implant survival rates and peri-implant bone loss, and patient satisfaction scores continued to be high. Although patient satisfaction and implant success were high during the 12- to 60-month period, the results should be interpreted with caution because of the high number of failing implants and patients lost to follow-up. More research is needed to study outcomes of treatment with immediately loaded mandibular implant overdentures.

  12. Production enhancement through aggressive flowback procedures in the Codell formation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, A.J.; Ashton, P.J.N.; Lang, J.

    1996-12-31

    Proppant flowback following fracture stimulation treatments continues to be a major concern in many wells around the world. The current trend towards more tip screen out (TSO) and reverse screenout designs has increased the need for better control of proppant flowback under increasingly severe drag force conditions. Recent studies in the Codell formation have indicated a correlation between load water and polymer recovery on fracture cleanup and subsequent gas production. This paper describes a subsequent twenty-five well study of the specific effects of combining forced closure/reverse gravel packs along with varying flowback rates and choke schedules on load water recoverymore » and normalized gas and condensate production. One of the key issues addressed is the use of aggressive flowback schedules while maintaining proppant flowback control.« less

  13. PWFQ: a priority-based weighted fair queueing algorithm for the downstream transmission of EPON

    NASA Astrophysics Data System (ADS)

    Xu, Sunjuan; Ye, Jiajun; Zou, Junni

    2005-11-01

    In the downstream direction of EPON, all ethernet frames share one downlink channel from the OLT to destination ONUs. To guarantee differentiated services, a scheduling algorithm is needed to solve the link-sharing issue. In this paper, we first review the classical WFQ algorithm and point out the shortcomings existing in the fair queueing principle of WFQ algorithm for EPON. Then we propose a novel scheduling algorithm called Priority-based WFQ (PWFQ) algorithm which distributes bandwidth based on priority. PWFQ algorithm can guarantee the quality of real-time services whether under light load or under heavy load. Simulation results also show that PWFQ algorithm not only can improve delay performance of real-time services, but can also meet the worst-case delay bound requirements.

  14. Crew Exploration Vehicle (CEV) Potable Water System Verification Description

    NASA Technical Reports Server (NTRS)

    Peterson, Laurie; DeVera, Jean; Vega, Leticia; Adam, Nik; Steele, John; Rector, Tony; Gazda, Daniel; Roberts, Michael

    2008-01-01

    The Crew Exploration Vehicle (CEV), also known as Orion, will ferry a crew of up to six astronauts to the International Space Station (ISS), or a crew of up to four astronauts to the moon. The first launch of CEV is scheduled for approximately 2014. A stored water system on the CEV will supply the crew with potable water for various purposes: drinking and food rehydration, hygiene, medical needs, sublimation, and various contingency situations. The current baseline biocide for the stored water system is ionic silver, similar in composition to the biocide used to maintain quality of the water transferred from the Orbiter to the ISS and stored in Contingency Water Containers (CWCs). In the CEV water system, the ionic silver biocide is expected to be depleted from solution due to ionic silver plating onto the surfaces of the materials within the CEV water system, thus negating its effectiveness as a biocide. Since the biocide depletion is expected to occur within a short amount of time after loading the water into the CEV water tanks at the Kennedy Space Center (KSC), an additional microbial

  15. Direct Digital Control of HVAC (Heating, Ventilating, and Air Conditioning).

    DTIC Science & Technology

    1985-01-01

    controller func- tions such as time-of-day, economizer cycles, reset, load shedding, chiller optimization , VAV fan synchronization, and optimum start/stop...control system such as that illustrated in Fig- urc 4. Data on setpoints , reset schedules, and event timing, such as that presented in Figure 6, are...program code (Figure 7). In addition to the control logic, setpoint and other data are readily available. Program logi:, setpoint and schedule data, and

  16. Assessing the impacts of future climate conditions on the effectiveness of winter cover crops in reducing nitrate loads into the Chesapeake Bay Watershed using SWAT model

    USGS Publications Warehouse

    Lee, Sangchul; Sadeghi, Ali M.; Yeo, In-Young; McCarty, Gregory W.; Hively, W. Dean

    2017-01-01

    Winter cover crops (WCCs) have been widely implemented in the Coastal Plain of the Chesapeake Bay watershed (CBW) due to their high effectiveness at reducing nitrate loads. However, future climate conditions (FCCs) are expected to exacerbate water quality degradation in the CBW by increasing nitrate loads from agriculture. Accordingly, the question remains whether WCCs are sufficient to mitigate increased nutrient loads caused by FCCs. In this study, we assessed the impacts of FCCs on WCC nitrate reduction efficiency on the Coastal Plain of the CBW using Soil and Water Assessment Tool (SWAT) model. Three FCC scenarios (2085 – 2098) were prepared using General Circulation Models (GCMs), considering three Intergovernmnental Panel on Climate Change (IPCC) Special Report on Emissions Scenarios (SRES) greenhouse gas emission scenarios. We also developed six representative WCC implementation scenarios based on the most commonly used planting dates and species of WCCs in this region. Simulation results showed that WCC biomass increased by ~ 58 % under FCC scenarios, due to climate conditions conducive to the WCC growth. Prior to implementing WCCs, annual nitrate loads increased by ~ 43 % under FCC scenarios compared to the baseline scenario (2001 – 2014). When WCCs were planted, annual nitrate loads were substantially reduced by ~ 48 % and WCC nitrate reduction efficiency water ~ 5 % higher under FCC scenarios relative to the baseline. The increase rate of WCC nitrate reduction efficiency varied by FCC scenarios and WCC planting methods. As CO2 concentration was higher and winters were warmer under FCC scenarios, WCCs had greater biomass and therefore showed higher nitrate reduction efficiency. In response to FCC scenarios, the performance of less effective WCC practices (e.g., barley, wheat, and late planting) under the baseline indicated ~ 14 % higher increase rate of nitrate reduction efficiency compared to ones with better effectiveness under the baseline (e.g., rye and early planting), due to warmer temperatures. According to simulation results, WCCs were effective to mitigate nitrate loads accelerated by FCCs and therefore the role of WCCs in mitigating nitrate loads is even more important in the given FCCs.

  17. Trajectories of Substance Use Disorder in Youth After Detention: A 12-Year Longitudinal Study

    PubMed Central

    Welty, Leah J.; Hershfield, Jennifer A.; Abram, Karen M.; Han, Hongyun; Byck, Gayle R.; Teplin, Linda A.

    2016-01-01

    Objective Identify trajectories of substance use disorders (SUDs) in youth during the 12 years after detention, and how gender, race/ethnicity, and age at baseline predict trajectories. Method As part of the Northwestern Juvenile Project, a longitudinal study of 1,829 youth randomly sampled from detention in Chicago, Illinois, 1995–1998, participants were re-interviewed in the community or correctional facilities up to 9 times over 12 years. Independent interviewers assessed SUDs using the Diagnostic Interview Schedule for Children 2.3 (baseline) and the Diagnostic Interview Schedule IV (follow-ups). Primary outcome was a mutually exclusive 5-category typology of disorder: no SUD, alcohol alone, marijuana alone, comorbid alcohol and marijuana, or “other” illicit (“hard”) drug. We estimated trajectories using growth mixture models with a 3-category ordinal variable derived from the typology. Results During the 12-year follow-up, 19.6% of youth did not have an SUD. The remaining 81.4% were in 3 trajectory classes. Class 1 (24.5%), a bell-shaped trajectory, peaked 5 years after baseline when 42.7% had an SUD and 12.5% had comorbid/“other” illicit drug disorders. Class 2 (41.3%) had higher prevalence of SUD at baseline (73.8%). Although prevalence decreased over time, 23.5% had an SUD 12 years later. Class 3 (14.6%), the most serious and persistent trajectory, had the highest prevalence of comorbid/“other” illicit drug disorders—52.1% at baseline and 17.4% 12 years later. Males, Hispanics, non-Hispanic whites, and youth who were older at baseline (detention) had the worst outcomes. Conclusion Gender, race/ethnicity, and age at detention predict trajectories of SUDs in delinquent youth. Findings provide an empirical basis for child psychiatry to address health disparities and improve prevention. PMID:28117060

  18. Multi-time Scale Joint Scheduling Method Considering the Grid of Renewable Energy

    NASA Astrophysics Data System (ADS)

    Zhijun, E.; Wang, Weichen; Cao, Jin; Wang, Xin; Kong, Xiangyu; Quan, Shuping

    2018-01-01

    Renewable new energy power generation prediction error like wind and light, brings difficulties to dispatch the power system. In this paper, a multi-time scale robust scheduling method is set to solve this problem. It reduces the impact of clean energy prediction bias to the power grid by using multi-time scale (day-ahead, intraday, real time) and coordinating the dispatching power output of various power supplies such as hydropower, thermal power, wind power, gas power and. The method adopts the robust scheduling method to ensure the robustness of the scheduling scheme. By calculating the cost of the abandon wind and the load, it transforms the robustness into the risk cost and optimizes the optimal uncertainty set for the smallest integrative costs. The validity of the method is verified by simulation.

  19. Scheduling Jobs with Variable Job Processing Times on Unrelated Parallel Machines

    PubMed Central

    Zhang, Guang-Qian; Wang, Jian-Jun; Liu, Ya-Jing

    2014-01-01

    m unrelated parallel machines scheduling problems with variable job processing times are considered, where the processing time of a job is a function of its position in a sequence, its starting time, and its resource allocation. The objective is to determine the optimal resource allocation and the optimal schedule to minimize a total cost function that dependents on the total completion (waiting) time, the total machine load, the total absolute differences in completion (waiting) times on all machines, and total resource cost. If the number of machines is a given constant number, we propose a polynomial time algorithm to solve the problem. PMID:24982933

  20. [Influence of work intensity on development of arterial hypertension in metal-mining workers].

    PubMed

    Ustinova, O Iu; Alekseev, V B; Rumiantseva, A N; Orehova, Ia V

    2013-01-01

    The article covers data on influence of working shifts duration and shift work intensity on cardiovascular system functioning in operators of mining excavators. Findings are that 8 hours shift with regular shift schedule (40 working hours per week) gives significant load on cardiovascular system of workers engaged into underground activities. 50% of mining excavator operators following this working schedule develop transitory arterial hypertension within 10 years. Longer work shift over 8 hours and more intensive shifting schedule over 40 hours per week causes stable arterial hypertension within 3 months in 60% of workers, in 10% of cases associated with lower functioning of sinus node.

  1. The JPL Resource Allocation Planning and Scheduling Office (RAPSO) process

    NASA Technical Reports Server (NTRS)

    Morris, D. G.; Burke, E. S.

    2002-01-01

    The Jet Propulsion Laboratory's Resource Allocation Planning and Scheduling Office is chartered to divide the limited amount of tracking hours of the Deep Space Network amongst the various missions in as equitable allotment as can be achieved. To best deal with this division of assets and time, an interactive process has evolved that promotes discussion with agreement by consensus between all of the customers that use the Deep Space Network (DSN). Aided by a suite of tools, the task of division of asset time is then performed in three stages of granularity. Using this approach, DSN loads are either forecasted or scheduled throughout a moving 10-year window.

  2. Relationships Between the External and Internal Training Load in Professional Soccer: What Can We Learn From Machine Learning?

    PubMed

    Jaspers, Arne; De Beéck, Tim Op; Brink, Michel S; Frencken, Wouter G P; Staes, Filip; Davis, Jesse J; Helsen, Werner F

    2018-05-01

    Machine learning may contribute to understanding the relationship between the external load and internal load in professional soccer. Therefore, the relationship between external load indicators (ELIs) and the rating of perceived exertion (RPE) was examined using machine learning techniques on a group and individual level. Training data were collected from 38 professional soccer players over 2 seasons. The external load was measured using global positioning system technology and accelerometry. The internal load was obtained using the RPE. Predictive models were constructed using 2 machine learning techniques, artificial neural networks and least absolute shrinkage and selection operator (LASSO) models, and 1 naive baseline method. The predictions were based on a large set of ELIs. Using each technique, 1 group model involving all players and 1 individual model for each player were constructed. These models' performance on predicting the reported RPE values for future training sessions was compared with the naive baseline's performance. Both the artificial neural network and LASSO models outperformed the baseline. In addition, the LASSO model made more accurate predictions for the RPE than did the artificial neural network model. Furthermore, decelerations were identified as important ELIs. Regardless of the applied machine learning technique, the group models resulted in equivalent or better predictions for the reported RPE values than the individual models. Machine learning techniques may have added value in predicting RPE for future sessions to optimize training design and evaluation. These techniques may also be used in conjunction with expert knowledge to select key ELIs for load monitoring.

  3. Automating Mid- and Long-Range Scheduling for NASA's Deep Space Network

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Tran, Daniel; Arroyo, Belinda; Sorensen, Sugi; Tay, Peter; Carruth, Butch; Coffman, Adam; Wallace, Mike

    2012-01-01

    NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system is architected as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users who utilize the DSN (representing 37 projects including international partners and ground-based science and calibration users). The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. S(sup 3) has been used for negotiating schedules since April 2011, including the baseline schedules for three launching missions in late 2011. S(sup 3) supports a distributed scheduling model, in which changes can potentially be made by multiple users based on multiple schedule "workspaces" or versions of the schedule. This has led to several challenges in the design of the scheduling database, and of a change proposal workflow that allows users to concur with or to reject proposed schedule changes, and then counter-propose with alternative or additional suggested changes. This paper describes some key aspects of the S(sup 3) system and lessons learned from its operational deployment to date, focusing on the challenges of multi-user collaborative scheduling in a practical and mission-critical setting. We will also describe the ongoing project to extend S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

  4. STS-58 crewmembers participate in baseline data collection

    NASA Image and Video Library

    1993-09-29

    S93-45376 (29 Sept 1993) --- Astronaut Rhea Seddon, STS-58 payload commander, participates in data collection for neurovestibular functions. The data collection process was in preparation for the Spacelab Life Sciences (SLS-2) flight scheduled for next month.

  5. Airspace Technology Demonstration 2 (ATD-2) Phase 1 Concept of Use (ConUse)

    NASA Technical Reports Server (NTRS)

    Jung, Yoon; Engelland, Shawn; Capps, Richard; Coppenbarger, Rich; Hooey, Becky; Sharma, Shivanjli; Stevens, Lindsay; Verma, Savita; Lohr, Gary; Chevalley, Eric; hide

    2018-01-01

    This document presents an operational Concept of Use (ConUse) for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, which began demonstration in 2017 at Charlotte Douglas International Airport (CLT). NASA is developing the IADS system under the ATD-2 sub-project in coordination with the Federal Aviation Administration (FAA) and aviation industry partners. The primary goal of ATD-2 sub-project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 effort is a five-year research activity through 2020. The initial phase of the ATD-2 sub-project, which is the focus of this document, will demonstrate the Phase 1 Baseline IADS capability at CLT in 2017. The Phase 1 Baseline IADS capabilities of the ATD-2 sub-project consists of: (a) Strategic and tactical surface scheduling to improve efficiency and predictability of airport surface operations, (b) Tactical departure scheduling to enhance merging of departures into overhead traffic streams via accurate predictions of takeoff times and automated coordination between the Airport Traffic Control Tower (ATCT, or Tower) and the Air Route Traffic Control Center (ARTCC, or Center), (c) Improvements in departure surface demand predictions in Time Based Flow Management (TBFM), (d) A prototype Electronic Flight Data (EFD) system provided by the FAA via the Terminal Flight Data Manager (TFDM) early implementation effort, and (e) Improved situational awareness and demand predictions through integration with the Traffic Flow Management System (TFMS), TBFM, and TFDM (3Ts) for electronic data integration and exchange, and an on-screen dashboard displaying pertinent analytics in real-time. The surface scheduling and metering element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 Upon successful demonstration of the Phase 1 Baseline IADS capability, follow-on demonstrations of the matured IADS traffic management capabilities will be conducted in the 2018-2020 timeframe. At the end of each phase of the demonstrations, NASA will transfer the ATD-2 sub-project technology to the FAA and industry partners.

  6. NextGen Operations in a Simulated NY Area Airspace

    NASA Technical Reports Server (NTRS)

    Smith, Nancy M.; Parke, Bonny; Lee, Paul; Homola, Jeff; Brasil, Connie; Buckley, Nathan; Cabrall, Chris; Chevalley, Eric; Lin, Cindy; Morey, Susan; hide

    2013-01-01

    A human-in-the-loop simulation conducted in the Airspace Operations Laboratory (AOL) at NASA Ames Research Center explored the feasibility of a Next Generation Air Transportation System (NextGen) solution to address airspace and airport capacity limitations in and around the New York metropolitan area. A week-long study explored the feasibility of a new Optimal Profile Descent (OPD) arrival into the airspace as well as a novel application of a Terminal Area Precision Scheduling and Spacing (TAPSS) enhancement to the Traffic Management Advisor (TMA) arrival scheduling tool to coordinate high volume arrival traffic to intersecting runways. In the simulation, four en route sector controllers and four terminal radar approach control (TRACON) controllers managed traffic inbound to Newark International Airport's primary runway, 22L, and its intersecting overflow runway, 11. TAPSS was used to generate independent arrival schedules for each runway and a traffic management coordinator participant adjusted the arrival schedule for each runway 11 aircraft to follow one of the 22L aircraft. TAPSS also provided controller-managed spacing tools (slot markers with speed advisories and timelines) to assist the TRACON controllers in managing the arrivals that were descending on OPDs. Results showed that the tools significantly decreased the occurrence of runway violations (potential go-arounds) when compared with a Baseline condition with no tools. Further, the combined use of the tools with the new OPD produced a peak arrival rate of over 65 aircraft per hour using instrument flight rules (IFR), exceeding the current maximum arrival rate at Newark Liberty International Airport (EWR) of 52 per hour under visual flight rules (VFR). Although the participants rated the workload as relatively low and acceptable both with and without the tools, they rated the tools as reducing their workload further. Safety and coordination were rated by most participants as acceptable in both conditions, although the TRACON Runway Coordinator (TRC) rated neither as acceptable in the Baseline condition. Regarding the role of the TRC, the two TRACON controllers handling the 11 arrivals indicated that the TRC was very much needed in the Baseline condition without tools, but not needed in the condition with tools. This indicates that the tools were providing much of the sequencing and spacing information that the TRC had supplied in the Baseline condition.

  7. Communication satellites for STS-5 being readied for loading

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Two commercial communication satellites scheduled for flight on STS-5 are pictured as they are being readied for loading into a special canister that will transport them to the launch pad. Telsat Canada's Anik C-3 (at bottom) is seen in its blanket covered cradle assemble. Satellite Business System's SBS-3 is at top. This photo was taken inside the vertical processing facility (VPF).

  8. Short-term bulk energy storage system scheduling for load leveling in unit commitment: modeling, optimization, and sensitivity analysis

    PubMed Central

    Hemmati, Reza; Saboori, Hedayat

    2016-01-01

    Energy storage systems (ESSs) have experienced a very rapid growth in recent years and are expected to be a promising tool in order to improving power system reliability and being economically efficient. The ESSs possess many potential benefits in various areas in the electric power systems. One of the main benefits of an ESS, especially a bulk unit, relies on smoothing the load pattern by decreasing on-peak and increasing off-peak loads, known as load leveling. These devices require new methods and tools in order to model and optimize their effects in the power system studies. In this respect, this paper will model bulk ESSs based on the several technical characteristics, introduce the proposed model in the thermal unit commitment (UC) problem, and analyze it with respect to the various sensitive parameters. The technical limitations of the thermal units and transmission network constraints are also considered in the model. The proposed model is a Mixed Integer Linear Programming (MILP) which can be easily solved by strong commercial solvers (for instance CPLEX) and it is appropriate to be used in the practical large scale networks. The results of implementing the proposed model on a test system reveal that proper load leveling through optimum storage scheduling leads to considerable operation cost reduction with respect to the storage system characteristics. PMID:27222741

  9. Short-term bulk energy storage system scheduling for load leveling in unit commitment: modeling, optimization, and sensitivity analysis.

    PubMed

    Hemmati, Reza; Saboori, Hedayat

    2016-05-01

    Energy storage systems (ESSs) have experienced a very rapid growth in recent years and are expected to be a promising tool in order to improving power system reliability and being economically efficient. The ESSs possess many potential benefits in various areas in the electric power systems. One of the main benefits of an ESS, especially a bulk unit, relies on smoothing the load pattern by decreasing on-peak and increasing off-peak loads, known as load leveling. These devices require new methods and tools in order to model and optimize their effects in the power system studies. In this respect, this paper will model bulk ESSs based on the several technical characteristics, introduce the proposed model in the thermal unit commitment (UC) problem, and analyze it with respect to the various sensitive parameters. The technical limitations of the thermal units and transmission network constraints are also considered in the model. The proposed model is a Mixed Integer Linear Programming (MILP) which can be easily solved by strong commercial solvers (for instance CPLEX) and it is appropriate to be used in the practical large scale networks. The results of implementing the proposed model on a test system reveal that proper load leveling through optimum storage scheduling leads to considerable operation cost reduction with respect to the storage system characteristics.

  10. Application of the Software as a Service Model to the Control of Complex Building Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stadler, Michael; Donadee, Jonathan; Marnay, Chris

    2011-03-17

    In an effort to create broad access to its optimization software, Lawrence Berkeley National Laboratory (LBNL), in collaboration with the University of California at Davis (UC Davis) and OSISoft, has recently developed a Software as a Service (SaaS) Model for reducing energy costs, cutting peak power demand, and reducing carbon emissions for multipurpose buildings. UC Davis currently collects and stores energy usage data from buildings on its campus. Researchers at LBNL sought to demonstrate that a SaaS application architecture could be built on top of this data system to optimize the scheduling of electricity and heat delivery in the building.more » The SaaS interface, known as WebOpt, consists of two major parts: a) the investment& planning and b) the operations module, which builds on the investment& planning module. The operational scheduling and load shifting optimization models within the operations module use data from load prediction and electrical grid emissions models to create an optimal operating schedule for the next week, reducing peak electricity consumption while maintaining quality of energy services. LBNL's application also provides facility managers with suggested energy infrastructure investments for achieving their energy cost and emission goals based on historical data collected with OSISoft's system. This paper describes these models as well as the SaaS architecture employed by LBNL researchers to provide asset scheduling services to UC Davis. The peak demand, emissions, and cost implications of the asset operation schedule and investments suggested by this optimization model are analysed.« less

  11. Application of the Software as a Service Model to the Control of Complex Building Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stadler, Michael; Donadee, Jon; Marnay, Chris

    2011-03-18

    In an effort to create broad access to its optimization software, Lawrence Berkeley National Laboratory (LBNL), in collaboration with the University of California at Davis (UC Davis) and OSISoft, has recently developed a Software as a Service (SaaS) Model for reducing energy costs, cutting peak power demand, and reducing carbon emissions for multipurpose buildings. UC Davis currently collects and stores energy usage data from buildings on its campus. Researchers at LBNL sought to demonstrate that a SaaS application architecture could be built on top of this data system to optimize the scheduling of electricity and heat delivery in the building.more » The SaaS interface, known as WebOpt, consists of two major parts: a) the investment& planning and b) the operations module, which builds on the investment& planning module. The operational scheduling and load shifting optimization models within the operations module use data from load prediction and electrical grid emissions models to create an optimal operating schedule for the next week, reducing peak electricity consumption while maintaining quality of energy services. LBNL's application also provides facility managers with suggested energy infrastructure investments for achieving their energy cost and emission goals based on historical data collected with OSISoft's system. This paper describes these models as well as the SaaS architecture employed by LBNL researchers to provide asset scheduling services to UC Davis. The peak demand, emissions, and cost implications of the asset operation schedule and investments suggested by this optimization model are analyzed.« less

  12. Towards a cognitive resource limitations model of diminished expression in schizotypy.

    PubMed

    Cohen, Alex S; Morrison, Sean C; Brown, Laura A; Minor, Kyle S

    2012-02-01

    Diminished expression of speech is a pernicious feature of both schizophrenia and schizotypy--defined as the personality organization reflecting a putative genetic schizophrenia liability. As yet, the mechanism underlying diminished expression is unclear. We tested the hypothesis that diminished expression reflects a cognitive resource issue--that is, as cognitive resources are depleted, expression becomes diminished in individuals with psychometrically defined schizotypy. Acoustic analysis of natural speech was procured during experimentally manipulated baseline and high cognitive-load dual tasks and examined in 38 individuals with psychometrically defined schizotypy and 34 controls. For both groups, expression significantly decreased as a function of increased task demands, although there were no group differences in expression or magnitude of change across baseline to high cognitive-load conditions. Participants with self-reported constricted affect showed significant reductions in expression under high-load versus baseline speaking conditions relative to other schizotypal and control participants. Moreover, psychometrically defined schizotypal participants with poor cognitive performance on the high-load task, suggestive of depleted cognitive resources, also showed expressivity reductions compared with other participants. These findings suggest that diminished expression occurs as a function of limited cognitive resources in psychometrically defined schizotypy. PsycINFO Database Record (c) 2012 APA, all rights reserved.

  13. CD4 responses in the setting or suboptimal virological responses to antiretroviral therapy: features, outcomes, and associated factors.

    PubMed

    Collazos, Julio; Asensi, Víctor; Cartón, José Antonio

    2009-07-01

    The factors associated with discordant viroimmunological responses following antiretroviral therapy are unclear. We studied 1380 patients who initiated a protease inhibitor (PI)-based antiretroviral regimen and who fulfilled the criteria for inclusion. Of them, 255 (18.5%) had CD4 increases > or =100 cells/microl after 1 year of therapy despite detectable viral load (immunological responders); they were compared with 669 patients (48.5%) who had CD4 increases <100 cells/microl regardless of their final viral load (immunological nonresponders). Immunological responders had higher rates of sexual acquisition of HIV (p = 0.03), lower rates of clinical progression (p = 0.02), higher probabilities of being naive to antiretroviral therapy (p = 0.006) or to PI if antiretroviral experienced (p = 0.03), higher rates of receiving only nucleoside reverse transcriptase inhibitors in addition to the PI (p = 0.04), and lower baseline CD4 counts (p = 0.007) and higher viral loads (p = 0.009), as compared with nonresponders. Multivariate analysis revealed that sexual transmission of HIV (homosexual p = 0.004, heterosexual p = 0.03), no prior PI experience (p = 0.005), absence of clinical progression (p = 0.02), and lower baseline CD4 counts (p = 0.03) were independently associated with immunological response. However, these factors differed according to the patients' prior antiretroviral status, as higher baseline viral load was also associated with immunological response in antiretroviral-experienced patients (p = 0.02), whereas baseline CD4 count (p = 0.007) was the only predictive parameter in antiretroviral-naive patients. We conclude that immunological responses despite suboptimal viral suppression are common. Prior PI experience, HIV transmission category, baseline CD4 counts, and clinical progression were independently predictive of this condition, although the associated factors were different depending on the patient's prior antiretroviral history.

  14. Understanding and Exploiting the Effects of Loading on Ultrasonic Sensing Systems for Structural Health Monitoring

    DTIC Science & Technology

    2012-02-01

    method to image fatigue cracks without requiring damage-free baseline measurements. Load-differential imaging maps changes in ultrasonic signals...caused by a small increase in applied load to an image, which enables detecting and locating fatigue cracks that open under load and thus distinguishing...them from other load-dependent effects. This method was successfully demonstrated in the laboratory during fatigue tests on a variety of aluminum

  15. Nontidal Loading Applied in VLBI Geodetic Analysis

    NASA Astrophysics Data System (ADS)

    MacMillan, D. S.

    2015-12-01

    We investigate the application of nontidal atmosphere pressure, hydrology, and ocean loading series in the analysis of VLBI data. The annual amplitude of VLBI scale variation is reduced to less than 0.1 ppb, a result of the annual components of the vertical loading series. VLBI site vertical scatter and baseline length scatter is reduced when these loading models are applied. We operate nontidal loading services for hydrology loading (GLDAS model), atmospheric pressure loading (NCEP), and nontidal ocean loading (JPL ECCO model). As an alternative validation, we compare these loading series with corresponding series generated by other analysis centers.

  16. Users Guide to Direct Digital Control of Heating, Ventilating, and Air Conditioning Equipment,

    DTIC Science & Technology

    1985-01-01

    cycles, reset, load shedding, chiller optimization , VAV fan synchronization, and optimum start/stop. The prospective buyer of a DDC system should...in Fig- ure 4. Data on setpoints , reset schedules, and event timing, such as that presented in Figure 6, are often even more difficult to find. In con...control logic, setpoint and other data are readily available. Program logic, setpoint and schedule data, and other information stored in a DDC unit

  17. Beam-energy-spread minimization using cell-timing optimization

    NASA Astrophysics Data System (ADS)

    Rose, C. R.; Ekdahl, C.; Schulze, M.

    2012-04-01

    Beam energy spread, and related beam motion, increase the difficulty in tuning for multipulse radiographic experiments at the dual-axis radiographic hydrodynamic test facility’s axis-II linear induction accelerator (LIA). In this article, we describe an optimization method to reduce the energy spread by adjusting the timing of the cell voltages (both unloaded and loaded), either advancing or retarding, such that the injector voltage and summed cell voltages in the LIA result in a flatter energy profile. We developed a nonlinear optimization routine which accepts as inputs the 74 cell-voltage, injector voltage, and beam current waveforms. It optimizes cell timing per user-selected groups of cells and outputs timing adjustments, one for each of the selected groups. To verify the theory, we acquired and present data for both unloaded and loaded cell-timing optimizations. For the unloaded cells, the preoptimization baseline energy spread was reduced by 34% and 31% for two shots as compared to baseline. For the loaded-cell case, the measured energy spread was reduced by 49% compared to baseline.

  18. Finite Element Analysis of the LOLA Receiver Telescope Lens

    NASA Technical Reports Server (NTRS)

    Matzinger, Elizabeth

    2007-01-01

    This paper presents the finite element stress and distortion analysis completed on the Receiver Telescope lens of the Lunar Orbiter Laser Altimeter (LOLA). LOLA is one of six instruments on the Lunar Reconnaissance Orbiter (LRO), scheduled to launch in 2008. LOLA's main objective is to produce a high-resolution global lunar topographic model to aid in safe landings and enhance surface mobility in future exploration missions. The Receiver Telescope captures the laser pulses transmitted through a diffractive optical element (DOE) and reflected off the lunar surface. The largest lens of the Receiver Telescope, Lens 1, is a 150 mm diameter aspheric lens originally designed to be made of BK7 glass. The finite element model of the Receiver Telescope Lens 1 is comprised of solid elements and constrained in a manner consistent with the behavior of the mounting configuration of the Receiver Telescope tube. Twenty-one temperature load cases were mapped to the nodes based on thermal analysis completed by LOLA's lead thermal analyst, and loads were applied to simulate the preload applied from the ring flexure. The thermal environment of the baseline design (uncoated BK7 lens with no baffle) produces large radial and axial gradients in the lens. These large gradients create internal stresses that may lead to part failure, as well as significant bending that degrades optical performance. The high stresses and large distortions shown in the analysis precipitated a design change from BK7 glass to sapphire.

  19. Upper Atmospheric Monitoring for Ares I-X Ascent Loads and Trajectory Evaluation on the Day-of-Launch

    NASA Technical Reports Server (NTRS)

    Roberts, Barry C.; McGrath, Kevin; Starr, Brett; Brandon, Jay

    2009-01-01

    During the launch countdown of the Ares I-X test vehicle, engineers from Langley Research Center will use profiles of atmospheric density and winds in evaluating vehicle ascent loads and controllability. A schedule for the release of balloons to measure atmospheric density and winds has been developed by the Natural Environments Branch at Marshall Space Flight Center to help ensure timely evaluation of the vehicle ascent loads and controllability parameters and support a successful launch of the Ares I-X vehicle.

  20. Fluor Hanford (FH) River Corridor Transition Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MCBRIDE, D.J.

    2002-08-28

    This Transition Plan defines the scope and schedule for actions that are critical for a smooth transition of the River Corridor scope of work and to ensure the achievement of transition as planned, with minimal or no impact to ongoing baseline activities.

  1. Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hulett, David T.; Nosbisch, Michael R.

    This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost,more » and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)« less

  2. Lumbar spine disc heights and curvature: upright posture vs. supine compression harness

    NASA Technical Reports Server (NTRS)

    Lee, Shi-Uk; Hargens, Alan R.; Fredericson, Michael; Lang, Philipp K.

    2003-01-01

    INTRODUCTION: Spinal lengthening in microgravity is thought to cause back pain in astronauts. A spinal compression harness can compress the spine to eliminate lengthening but the loading condition with harness is different than physiologic conditions. Our purpose was to compare the effect of spine compression with a harness in supine position on disk height and spinal curvature in the lumbar spine to that of upright position as measured using a vertically open magnetic resonance imaging system. METHODS: Fifteen healthy subjects volunteered. On day 1, each subject lay supine for an hour and a baseline scan of the lumbar spine was performed. After applying a load of fifty percent of body weight with the harness for thirty minutes, the lumbar spine was scanned again. On day 2, after a baseline scan, a follow up scan was performed after kneeling for thirty minutes within the gap between two vertically oriented magnetic coils. Anterior and posterior disk heights, posterior disk bulging, and spinal curvature were measured from the baseline and follow up scans. RESULTS: Anterior disk heights increased and posterior disk heights decreased compared with baseline scans both after spinal compression with harness and upright posture. The spinal curvature increased by both loading conditions of the spine. DISCUSSION: The spinal compression with specially designed harness has the same effect as the physiologic loading of the spine in the kneeling upright position. The harness shows some promise as a tool to increase the diagnostic capabilities of a conventional MR system.

  3. 76 FR 34109 - Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-10

    .... 80a-22(d)) to the extent necessary to permit scheduled variations in or elimination of the sales load... on respondents, including through the use of automated collection techniques or other forms of...

  4. Baseline tests of the battronic Minivan electric delivery van

    NASA Technical Reports Server (NTRS)

    Dustin, M. O.; Soltis, R. F.; Bozek, J. M.; Maslowski, E. A.

    1977-01-01

    An electric passenger vehicle was tested to develop data characterizing the state of the art of electric and hybrid vehicles. The test measured vehicle maximum speed, range at constant speed, range over stop-and-go driving schedules, maximum acceleration, gradeability and limit, road energy consumption, road power, indicated energy consumption, braking capability and battery charge efficiency. The data obtained are to serve as a baseline to compare improvements in electric and hybrid vehicle technologies and to assist in establishing performance standards.

  5. Navy Irregular Warfare and Counterterrorism Operations: Background and Issues for Congress

    DTIC Science & Technology

    2015-09-25

    practices in which suspects were sent to the U.S. detention facility at Guantanamo Bay, Cuba, or secret CIA prisons. The process ordinarily begins with...But prototype DCS mini-subs cannot fit inside the current shelter design. As a result , a modernization program will stretch the DDS units by 50...In June 2014, the SWCS program was re-baselined as a result of significant cost and schedule overruns. Less than a year after this re-baselining, the

  6. Collectives for Multiple Resource Job Scheduling Across Heterogeneous Servers

    NASA Technical Reports Server (NTRS)

    Tumer, K.; Lawson, J.

    2003-01-01

    Efficient management of large-scale, distributed data storage and processing systems is a major challenge for many computational applications. Many of these systems are characterized by multi-resource tasks processed across a heterogeneous network. Conventional approaches, such as load balancing, work well for centralized, single resource problems, but breakdown in the more general case. In addition, most approaches are often based on heuristics which do not directly attempt to optimize the world utility. In this paper, we propose an agent based control system using the theory of collectives. We configure the servers of our network with agents who make local job scheduling decisions. These decisions are based on local goals which are constructed to be aligned with the objective of optimizing the overall efficiency of the system. We demonstrate that multi-agent systems in which all the agents attempt to optimize the same global utility function (team game) only marginally outperform conventional load balancing. On the other hand, agents configured using collectives outperform both team games and load balancing (by up to four times for the latter), despite their distributed nature and their limited access to information.

  7. Correlating Cognitive Decline with White Matter Lesion and Brain Atrophy MRI Measurements in Alzheimer’s Disease

    PubMed Central

    Bilello, Michel; Doshi, Jimit; Nabavizadeh, S. Ali; Toledo, Jon B.; Erus, Guray; Xie, Sharon X.; Trojanowski, John Q.; Han, Xiaoyan; Davatzikos, Christos

    2015-01-01

    Background Vascular risk factors are increasingly recognized as risks factors for Alzheimer’s disease (AD) and early conversion from mild cognitive impairment (MCI) to dementia. While neuroimaging research in AD has focused on brain atrophy, metabolic function or amyloid deposition, little attention has been paid to the effect of cerebrovascular disease to cognitive decline. Objective To investigate the correlation of brain atrophy and white matter lesions with cognitive decline in AD, MCI, and control subjects. Methods Patients with AD and MCI, and healthy subjects were included in this study. Subjects had a baseline MRI scan, and baseline and follow-up neuropsychological battery (CERAD). Regional volumes were measured, and white matter lesion segmentation was performed. Correlations between rate of CERAD score decline and white matter lesion load and brain structure volume were evaluated. In addition, voxel-based correlations between baseline CERAD scores and atrophy and white matter lesion measures were computed. Results CERAD rate of decline was most significantly associated with lesion loads located in the fornices. Several temporal lobe ROI volumes were significantly associated with CERAD decline. Voxel-based analysis demonstrated strong correlation between baseline CERAD scores and atrophy measures in the anterior temporal lobes. Correlation of baseline CERAD scores with white matter lesion volumes achieved significance in multilobar subcortical white matter. Conclusion Both baseline and declines in CERAD scores correlate with white matter lesion load and gray matter atrophy. Results of this study highlight the dominant effect of volume loss, and underscore the importance of small vessel disease as a contributor to cognitive decline in the elderly. PMID:26402108

  8. Correlating Cognitive Decline with White Matter Lesion and Brain Atrophy Magnetic Resonance Imaging Measurements in Alzheimer's Disease.

    PubMed

    Bilello, Michel; Doshi, Jimit; Nabavizadeh, S Ali; Toledo, Jon B; Erus, Guray; Xie, Sharon X; Trojanowski, John Q; Han, Xiaoyan; Davatzikos, Christos

    2015-01-01

    Vascular risk factors are increasingly recognized as risks factors for Alzheimer's disease (AD) and early conversion from mild cognitive impairment (MCI) to dementia. While neuroimaging research in AD has focused on brain atrophy, metabolic function, or amyloid deposition, little attention has been paid to the effect of cerebrovascular disease to cognitive decline. To investigate the correlation of brain atrophy and white matter lesions with cognitive decline in AD, MCI, and control subjects. Patients with AD and MCI, and healthy subjects were included in this study. Subjects had a baseline MRI scan, and baseline and follow-up neuropsychological battery (CERAD). Regional volumes were measured, and white matter lesion segmentation was performed. Correlations between rate of CERAD score decline and white matter lesion load and brain structure volume were evaluated. In addition, voxel-based correlations between baseline CERAD scores and atrophy and white matter lesion measures were computed. CERAD rate of decline was most significantly associated with lesion loads located in the fornices. Several temporal lobe ROI volumes were significantly associated with CERAD decline. Voxel-based analysis demonstrated strong correlation between baseline CERAD scores and atrophy measures in the anterior temporal lobes. Correlation of baseline CERAD scores with white matter lesion volumes achieved significance in multilobar subcortical white matter. Both baseline and declines in CERAD scores correlate with white matter lesion load and gray matter atrophy. Results of this study highlight the dominant effect of volume loss, and underscore the importance of small vessel disease as a contributor to cognitive decline in the elderly.

  9. Electric Vehicles Charging Scheduling Strategy Considering the Uncertainty of Photovoltaic Output

    NASA Astrophysics Data System (ADS)

    Wei, Xiangxiang; Su, Su; Yue, Yunli; Wang, Wei; He, Luobin; Li, Hao; Ota, Yutaka

    2017-05-01

    The rapid development of electric vehicles and distributed generation bring new challenges to security and economic operation of the power system, so the collaborative research of the EVs and the distributed generation have important significance in distribution network. Under this background, an EVs charging scheduling strategy considering the uncertainty of photovoltaic(PV) output is proposed. The characteristics of EVs charging are analysed first. A PV output prediction method is proposed with a PV database then. On this basis, an EVs charging scheduling strategy is proposed with the goal to satisfy EVs users’ charging willingness and decrease the power loss in distribution network. The case study proves that the proposed PV output prediction method can predict the PV output accurately and the EVs charging scheduling strategy can reduce the power loss and stabilize the fluctuation of the load in distributed network.

  10. Influence of immediate loading on provisional restoration in dental implant stability

    NASA Astrophysics Data System (ADS)

    Ikbal, M.; Odang, R. W.; Indrasari, M.; Dewi, R. S.

    2017-08-01

    The success of dental implant treatment is determined by the primary stability at placement. One factor that could influence this stability is occlusal loading through provisional restoration. Two types of loading protocols are usually used: immediate and delayed loading. However, some controversies remain about the influence of occlusal loading on implant stability. Therefore, the influence of immediate loading on implant stability must be studied. An animal study was conducted by placing nine dental implants in the mandibular jaw of three Macaca fascicularis. Provisional restorations with various occlusal contacts (no, light, and normal contact) were placed on the implant. The implant stability was measured using the Ostell ISQ three times: immediately (baseline) and at the first and second months after implant placement. The implant stability between implants with no and normal occlusal contact as well as light and normal occlusal contact showed significant differences (p < 0.05) at the first and second months after implant placement. However, no significant increase (p > 0.05) in implant stability was seen at the baseline and the first and second months after implant placement for all occlusal contact groups. Immediate loading influenced the implant stability, and provisional restoration of implant without occlusal contact showed the highest implant stability.

  11. Experience with dynamic reinforcement rates decreases resistance to extinction.

    PubMed

    Craig, Andrew R; Shahan, Timothy A

    2016-03-01

    The ability of organisms to detect reinforcer-rate changes in choice preparations is positively related to two factors: the magnitude of the change in rate and the frequency with which rates change. Gallistel (2012) suggested similar rate-detection processes are responsible for decreases in responding during operant extinction. Although effects of magnitude of change in reinforcer rate on resistance to extinction are well known (e.g., the partial-reinforcement-extinction effect), effects of frequency of changes in rate prior to extinction are unknown. Thus, the present experiments examined whether frequency of changes in baseline reinforcer rates impacts resistance to extinction. Pigeons pecked keys for variable-interval food under conditions where reinforcer rates were stable and where they changed within and between sessions. Overall reinforcer rates between conditions were controlled. In Experiment 1, resistance to extinction was lower following exposure to dynamic reinforcement schedules than to static schedules. Experiment 2 showed that resistance to presession feeding, a disruptor that should not involve change-detection processes, was unaffected by baseline-schedule dynamics. These findings are consistent with the suggestion that change detection contributes to extinction. We discuss implications of change-detection processes for extinction of simple and discriminated operant behavior and relate these processes to the behavioral-momentum based approach to understanding extinction. © 2016 Society for the Experimental Analysis of Behavior.

  12. Hybrid robust predictive optimization method of power system dispatch

    DOEpatents

    Chandra, Ramu Sharat [Niskayuna, NY; Liu, Yan [Ballston Lake, NY; Bose, Sumit [Niskayuna, NY; de Bedout, Juan Manuel [West Glenville, NY

    2011-08-02

    A method of power system dispatch control solves power system dispatch problems by integrating a larger variety of generation, load and storage assets, including without limitation, combined heat and power (CHP) units, renewable generation with forecasting, controllable loads, electric, thermal and water energy storage. The method employs a predictive algorithm to dynamically schedule different assets in order to achieve global optimization and maintain the system normal operation.

  13. Heavy Traffic Feasible Hybrid Intracycle and Cyclic Sleep for Power Saving in 10G-EPON

    PubMed Central

    Wang, Liqian; Zhang, Zhiguo; Chen, Xue

    2014-01-01

    Energy consumption in optical access networks costs carriers substantial operational expense (OPEX) every year and is one of contributing factors for the global warming. To reduce energy consumption in the 10-gigabit Ethernet passive optical network (10G-EPON), a hybrid intracycle and cyclic sleep mechanism is proposed in this paper. Under heavy traffic load, optical network units (ONUs) can utilize short idle slots within each scheduling cycle to enter intracycle sleep without postponing data transmission. In this way, energy conservation is achieved even under heavy traffic load with quality of service (QoS) guarantee. Under light traffic load, ONUs perform long cyclic sleep for several scheduling cycles. The adoption of cyclic sleep instead of intracycle sleep under light traffic load can reduce unnecessary frequent transitions between sleep and full active work caused by using intracycle sleep. Further, the Markov chain of the proposed mechanism is established. The performances of the proposed mechanism and existing approaches are analyzed quantitatively based on the chain. For the proposed mechanism, power saving ability with QoS guarantee even under heavy traffic and better power saving performance than existing approaches are verified by the quantitative analysis. Moreover, simulations validate the above conclusions based on the chain. PMID:25177727

  14. Nurse Case Management and Housing Interventions Reduce Allergen Exposures: The Milwaukee Randomized Controlled Trial

    PubMed Central

    Breysse, Jill; Wendt, Jean; Dixon, Sherry; Murphy, Amy; Wilson, Jonathan; Meurer, John; Cohn, Jennifer; Jacobs, David E.

    2011-01-01

    Objective We examined the impact of a combination of home environmental interventions and nurse case management services on total settled dust loadings and on allergen concentrations in the homes of asthmatic children. Methods Using a randomized longitudinal controlled trial study design, we randomly assigned homes of asthmatic children in Milwaukee to either a control (n=64) or an intervention (n=57) group. Control group homes received a visual assessment, education, bed/pillow dust mite encasings, and treatment of lead-based paint hazards. The intervention group received these same services plus nurse case management that included tailored, individual asthma action plans, provision of minor home repairs, home cleaning using special vacuuming and wet washing, and integrated pest management. Dust vacuum samples were collected from measured surface areas of floors in the TV room, kitchen, and child's bedroom at baseline and at three-, six-, and 12-month follow-up visits. Dust loading (mass per surface area) is a means of measuring total dust and the total amount of allergen present. Results For the intervention group, geometric mean dust loadings declined significantly from baseline (39 milligrams per square foot [mg/ft2]) to post-intervention (11 mg/ft2) (p<0.001). Baseline dust loading, treatment group, visit, and season were significant predictors of follow-up dust loadings. Mean post-intervention dust loadings were 72% higher in the control group. The total amount of allergen in settled house dust declined significantly following the intervention because total dust loading declined; the concentration of allergens in settled dust did not change significantly. Conclusion The combination of nurse case management and home environmental interventions promotes collaboration between health and housing professionals and is effective in reducing exposures to allergens in settled dust. PMID:21563716

  15. Mineral water administration may increase kidney elimination of urea, creatinine and folic acid in a concentration-dependent fashion.

    PubMed

    Calomino, Francesco; Di Paolo, Nicola; Nicolai, Giulia; Miglio, Antonio

    2010-05-01

    In a previous experimental study we showed that the administration of a large water load in a short time increases the urinary flow and the transport capacity in the excretory tract of the rabbit ureter. In human subjects drinking a water load of 25 ml/kg(BW) in 30 minutes, diuresis, creatinine and urea clearance increase more than in those drinking the same load in 24 hours. The aim of the present study was to investigate possible correlations between percent reduction and baseline values of serum urea, creatinine, folic acid, and magnesium in humans. 20 volunteers were divided in two groups. Subjects in group 1 received a water load of 25 ml/kg(BW) in 24 hours followed by the same load in 30 minutes. Subjects in group 2 received the same water load but in inverse order. Before and after each water administration, the following variables were measured and compared: diuresis, serum urea, creatinine, folic acid and magnesium concentration, and urea and creatinine clearance. Serum urea and folic acid concentration decreased up to 40% after administration of the water load in 24 hours. Serum creatinine concentration decreased up to 20% after administration of the water load in 30 minutes. The concentration drop of these metabolites increased with increasing baseline metabolite concentrations.

  16. Geosynchronous platform definition study. Volume 4, Part 1: Traffic analysis and system requirements for the baseline traffic model

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The traffic analyses and system requirements data generated in the study resulted in the development of two traffic models; the baseline traffic model and the new traffic model. The baseline traffic model provides traceability between the numbers and types of geosynchronous missions considered in the study and the entire spectrum of missions foreseen in the total national space program. The information presented pertaining to the baseline traffic model includes: (1) definition of the baseline traffic model, including identification of specific geosynchronous missions and their payload delivery schedules through 1990; (2) Satellite location criteria, including the resulting distribution of the satellite population; (3) Geosynchronous orbit saturation analyses, including the effects of satellite physical proximity and potential electromagnetic interference; and (4) Platform system requirements analyses, including satellite and mission equipment descriptions, the options and limitations in grouping satellites, and on-orbit servicing criteria (both remotely controlled and man-attended).

  17. Cumulative fatigue damage behavior of MAR M-247

    NASA Technical Reports Server (NTRS)

    Mcgaw, Michael A.; Halford, Gary R.; Kalluri, Sreeramesh

    1991-01-01

    The objective was to examine the room temperature fatigue and nonlinear cumulative fatigue damage behavior of the cast nickel-based superalloy, MAR M-247. The fatigue test matrix consisted of single-level, fully reversed fatigue experiments. Two series of tests were performed: one of the two baseline fatigue LCF (Low-Cycle Fatigue) life levels was used in the first loading block, and the HCF (High-Cycle Fatigue) baseline loading level was used in the second block in each series. For each series, duplicate tests were performed at each applied LCF life fraction.

  18. Scheduling with Automatic Resolution of Conflicts

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Schaffer, Steve

    2006-01-01

    DSN Requirement Scheduler is a computer program that automatically schedules, reschedules, and resolves conflicts for allocations of resources of NASA s Deep Space Network (DSN) on the basis of ever-changing project requirements for DSN services. As used here, resources signifies, primarily, DSN antennas, ancillary equipment, and times during which they are available. Examples of project-required DSN services include arraying, segmentation, very-long-baseline interferometry, and multiple spacecraft per aperture. Requirements can include periodic reservations of specific or optional resources during specific time intervals or within ranges specified in terms of starting times and durations. This program is built on the Automated Scheduling and Planning Environment (ASPEN) software system (aspects of which have been described in previous NASA Tech Briefs articles), with customization to reflect requirements and constraints involved in allocation of DSN resources. Unlike prior DSN-resource- scheduling programs that make single passes through the requirements and require human intervention to resolve conflicts, this program makes repeated passes in a continuing search for all possible allocations, provides a best-effort solution at any time, and presents alternative solutions among which users can choose.

  19. Herpes simplex virus type 2 (HSV-2) genital shedding in HSV-2-/HIV-1-co-infected women receiving effective combination antiretroviral therapy.

    PubMed

    Péré, Héléne; Rascanu, Aida; LeGoff, Jérome; Matta, Mathieu; Bois, Frédéric; Lortholary, Olivier; Leroy, Valériane; Launay, Odile; Bélec, Laurent

    2016-03-01

    The dynamics of genital shedding of HSV-2 DNA was assessed in HIV-1-infected women taking combination antiretroviral therapy (cART). HIV-1 RNA, HIV-1 DNA and HSV DNA loads were measured during 12-18 months using frozen plasma, PBMC and cervicovaginal lavage samples from 22 HIV-1-infected women, including 17 women naive for antiretroviral therapy initiating cART and 5 women with virological failure switching to a new regimen. Nineteen (86%) women were HSV-2-seropositive. Among HSV-2-/HIV-1-co-infected women, HIV-1 RNA loads showed a rapid fall from baseline after one month of cART, in parallel in paired plasma and cervicovaginal secretions. In contrast, HIV-1 DNA loads did not show significant variations from baseline up to 18 months of treatment in both systemic and genital compartments. HSV DNA was detected at least once in 12 (63%) of 19 women during follow up: HSV-2 shedding in the genital compartment was observed in 11% of cervicovaginal samples at baseline and in 16% after initiating or switching cART. Cervicovaginal HIV-1 RNA loads were strongly associated with plasma HIV-1 RNA loads over time, but not with cervicovaginal HSV DNA loads. Reactivation of genital HSV-2 replication frequently occurred despite effective cART in HSV-2-/HIV-1-co-infected women. Genital HSV-2 replication under cART does not influence cervicovaginal HIV-1 RNA or DNA shedding. © The Author(s) 2015.

  20. Associations between Culturally Relevant Recruitment Strategies and Participant Interest, Enrollment and Generalizability in a Weight-loss Intervention for African American Families.

    PubMed

    Huffman, Lauren E; Wilson, Dawn K; Kitzman-Ulrich, Heather; Lyerly, Jordan E; Gause, Haylee M; Resnicow, Ken

    2016-07-21

    Culturally relevant recruitment strategies may be an important approach for recruiting ethnic minorities for interventions. Previous research has examined associations between recruitment strategies and enrollment of African Americans (AA), but has not explored more deeply the role of incorporating sociocultural values into recruitment strategies. Our current study explores whether sociocultural recruitment mediums were associated with demographics, interest and enrollment in a weight-loss intervention. Sociocultural mediums included community partnerships, culturally relevant ads, sociocultural events, or word-of-mouth. Non-sociocultural mediums included community/school events that did not specifically target AAs. Analyses examined whether demographics of enrolled families differed by recruitment strategy and if recruitment strategy predicted scheduling a baseline visit, enrolling in a run-in phase, and enrolling in the intervention program. Families recruited from culturally relevant ads, sociocultural events, or word-of-mouth were 1.96 times more likely to schedule a baseline visit (OR=1.96, 95% CI=1.05, 3.68) than families recruited from non-sociocultural mediums. No differences were found for sociocultural mediums on enrolling in the run-in phase or the intervention. However, among enrolled families, those recruited from sociocultural mediums were less likely to be employed (X(2) [1, N=142] =5.53, P<.05) and more likely to have lower income (X(2) [1, N=142] =13.57, P<.05). Sociocultural mediums were associated with scheduling a baseline visit, but not enrollment. They were, however, effective in recruiting a more generalizable sample among enrolled participants based on demographic characteristics. Integrating sociocultural values into recruitment methods may be a valuable strategy for increasing interest in participation among underrepresented AA families.

  1. Low Probability Tail Event Analysis and Mitigation in BPA Control Area: Task One Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lu, Shuai; Makarov, Yuri V.

    This is a report for task one of the tail event analysis project for BPA. Tail event refers to the situation in a power system when unfavorable forecast errors of load and wind are superposed onto fast load and wind ramps, or non-wind generators falling short of scheduled output, the imbalance between generation and load becomes very significant. This type of events occurs infrequently and appears on the tails of the distribution of system power imbalance; therefore, is referred to as tail events. This report analyzes what happened during the Electric Reliability Council of Texas (ERCOT) reliability event on Februarymore » 26, 2008, which was widely reported because of the involvement of wind generation. The objective is to identify sources of the problem, solutions to it and potential improvements that can be made to the system. Lessons learned from the analysis include the following: (1) Large mismatch between generation and load can be caused by load forecast error, wind forecast error and generation scheduling control error on traditional generators, or a combination of all of the above; (2) The capability of system balancing resources should be evaluated both in capacity (MW) and in ramp rate (MW/min), and be procured accordingly to meet both requirements. The resources need to be able to cover a range corresponding to the variability of load and wind in the system, additional to other uncertainties; (3) Unexpected ramps caused by load and wind can both become the cause leading to serious issues; (4) A look-ahead tool evaluating system balancing requirement during real-time operations and comparing that with available system resources should be very helpful to system operators in predicting the forthcoming of similar events and planning ahead; and (5) Demand response (only load reduction in ERCOT event) can effectively reduce load-generation mismatch and terminate frequency deviation in an emergency situation.« less

  2. Sampling considerations for establishment of baseline loadings from forested watersheds for TMDL application

    Treesearch

    Pamela J. Edwards; Karl W.J. Williard; James N. Kochenderfer

    2004-01-01

    Five methods for estimating maximum daily and annual nitrate (NO3) and suspended sediment loads using periodic sampling of varying intensities were compared to actual loads calculated from intensive stormflow and baseflow sampling from small, forested watersheds in north central West Virginia to determine if the less intensive sampling methods were accurate and could...

  3. Space shuttle solid rocket booster recovery system definition. Volume 3: SRB water impact loads computer program, user's manual

    NASA Technical Reports Server (NTRS)

    1973-01-01

    This user's manual describes the FORTRAN IV computer program developed to compute the total vertical load, normal concentrated pressure loads, and the center of pressure of typical SRB water impact slapdown pressure distributions specified in the baseline configuration. The program prepares the concentrated pressure load information in punched card format suitable for input to the STAGS computer program. In addition, the program prepares for STAGS input the inertia reacting loads to the slapdown pressure distributions.

  4. Health and Occupational Outcomes Among Injured, Nonstandard Shift Workers.

    PubMed

    Wong, Imelda S; Smith, Peter M; Mustard, Cameron A; Gignac, Monique A M

    2015-11-01

    This study compares health and occupational outcomes following a work-related injury for nonstandard and day-shift workers. National Population Health Survey data were used to explore outcomes 2 years post-work injury. Retrospective-matched cohort analyses examined main effects and interactions of shift schedule and work injury with changes in health, shift schedule, and labor force status. Models were adjusted for respondent characteristics, baseline health status, and occupational strength requirements. Injured nonstandard shift workers reported lower health utility index scores, compared with uninjured and injured daytime workers and uninjured nonstandard-shift workers. No significant interactions between shift and injury were found with schedule change and leaving the labor force. Injured nonstandard-shift workers are as likely to remain employed as other groups, but may be vulnerable in terms of diminished health.

  5. A treatment comparison study of a photo activity schedule and Social Stories for teaching social skills to children with Autism Spectrum Disorder: brief report.

    PubMed

    Daneshvar, Sabrina D; Charlop, Marjorie H; Berry Malmberg, Debra

    2018-05-21

    To compare the efficacy of two procedures, a photo activity schedule intervention and Social Stories, to teach social skills to four children diagnosed with Autism Spectrum Disorder (ASD). An adapted alternating treatments design with an additional multiple baseline control was used, and two social skills were targeted for each of the four participants, one under each intervention condition. Results indicated that all four participants learned the target social behaviours with the photo activity schedule intervention, but did not learn target social behaviours with Social Stories. Findings support the use of a photo activity intervention for teaching social skillsto children with ASD; we discuss the implications of inconsistent findings of effectiveness of Social Stories.

  6. Core compressor exit stage study, volume 6

    NASA Technical Reports Server (NTRS)

    Wisler, D. C.

    1981-01-01

    Rear stage blading designs that have lower losses in their endwall boundary layer regions were studied. A baseline Stage A was designed as a low-speed model of stage 7 of a 10-stage compressor. Candidate rotors and stators were designed which have the potential of reducing endwall losses relative to the baseline. Rotor B uses a type of meanline in the tip region that unloads the leading edge and loads the trailing edge relative to the baseline rotor A designs. Rotor C incorporates a more skewed (hub strong) radial distribution of total pressure and smoother distribution of static pressure on the rotor tip than those of rotor B. Candidate stator B embodies twist gradients in the endwall region. Stator C embodies airfoil sections near the endwalls that have reduced trailing edge loading relative to stator A. The baseline and candidate bladings were tested using four identical stages to produce a true multistage environment. Single-stage tests were also conducted. The test data were analyzed and performances were compared. Several of the candidate configurations showed a performance improvement relative to the baseline.

  7. Pathogen reduction co-benefits of nutrient best management practices

    PubMed Central

    Wainger, Lisa A.; Barber, Mary C.

    2016-01-01

    Background Many of the practices currently underway to reduce nitrogen, phosphorus, and sediment loads entering the Chesapeake Bay have also been observed to support reduction of disease-causing pathogen loadings. We quantify how implementation of these practices, proposed to meet the nutrient and sediment caps prescribed by the Total Maximum Daily Load (TMDL), could reduce pathogen loadings and provide public health co-benefits within the Chesapeake Bay system. Methods We used published data on the pathogen reduction potential of management practices and baseline fecal coliform loadings estimated as part of prior modeling to estimate the reduction in pathogen loadings to the mainstem Potomac River and Chesapeake Bay attributable to practices implemented as part of the TMDL. We then compare the estimates with the baseline loadings of fecal coliform loadings to estimate the total pathogen reduction potential of the TMDL. Results We estimate that the TMDL practices have the potential to decrease disease-causing pathogen loads from all point and non-point sources to the mainstem Potomac River and the entire Chesapeake Bay watershed by 19% and 27%, respectively. These numbers are likely to be underestimates due to data limitations that forced us to omit some practices from analysis. Discussion Based on known impairments and disease incidence rates, we conclude that efforts to reduce nutrients may create substantial health co-benefits by improving the safety of water-contact recreation and seafood consumption. PMID:27904807

  8. Pathogen reduction co-benefits of nutrient best management practices.

    PubMed

    Richkus, Jennifer; Wainger, Lisa A; Barber, Mary C

    2016-01-01

    Many of the practices currently underway to reduce nitrogen, phosphorus, and sediment loads entering the Chesapeake Bay have also been observed to support reduction of disease-causing pathogen loadings. We quantify how implementation of these practices, proposed to meet the nutrient and sediment caps prescribed by the Total Maximum Daily Load (TMDL), could reduce pathogen loadings and provide public health co-benefits within the Chesapeake Bay system. We used published data on the pathogen reduction potential of management practices and baseline fecal coliform loadings estimated as part of prior modeling to estimate the reduction in pathogen loadings to the mainstem Potomac River and Chesapeake Bay attributable to practices implemented as part of the TMDL. We then compare the estimates with the baseline loadings of fecal coliform loadings to estimate the total pathogen reduction potential of the TMDL. We estimate that the TMDL practices have the potential to decrease disease-causing pathogen loads from all point and non-point sources to the mainstem Potomac River and the entire Chesapeake Bay watershed by 19% and 27%, respectively. These numbers are likely to be underestimates due to data limitations that forced us to omit some practices from analysis. Based on known impairments and disease incidence rates, we conclude that efforts to reduce nutrients may create substantial health co-benefits by improving the safety of water-contact recreation and seafood consumption.

  9. Methyl bromide as a quarantine treatment for Chlorophorus annularis (Coleoptera: Cerambycidae) in raw bamboo poles.

    PubMed

    Barak, Alan V; Weidong, Yang; Daojian, Yu; Yi, Jiao; Lin, Kang; Zhilin, Chen; Xingyuan, Ling; Guoping, Zhan

    2009-06-01

    At least 26 different species of insects of quarantine significance were intercepted from 1985 to 2005 on bamboo (Bambusa spp.) garden stakes from China. Three fifths of the live insects were cerambycids in nine genera, including Chlorophorus annularis F., the bamboo borer. The current APHIS-PPQ treatment is fumigation schedule T404-d, which requires high doses of methyl bromide (MeBr) for 24 h. No specific fumigation data exist for C. annularis. Chinese and American quarantine scientists cooperated in testing to determine whether this schedule, or lower doses, would be effective as a quarantine treatment for C. annularis infesting dried bamboo poles. A lower dose based on APHIS tests for solid wood packing (SWP) failed (3/511 survivors) at 56 g/m3 for 24 h at 10.0 degrees C. We therefore tested five progressive doses at five temperatures intermediate between the lower SWP schedule and the much higher applied doses (e.g., 120 g/m3 for 24 h at 10.0 degrees C) of schedule T404-d. Fumigations of infested bamboo poles conducted in 403.2-liter chambers with 52% vol:vol loading at doses of 48, 64, 80, 96, and 112 g/m3 at 26.7, 21.1, 15.6, 10.0, and 4.4 degrees C, respectively (20 total replicates, with 4 replicates per dose), had no survivors among 2,847 larvae, 140 pupae, and 122 adults. Control replicates (three) had a total of 455 live stages (397 larvae, 31 pupae, and 27 adults). Tests conducted with a sea/land cargo container loaded to 80% capacity with bamboo poles verified the ability of the schedule to maintain effective concentrations over 24 h in commercial-sized fumigations. We propose a new bamboo quarantine treatment schedule at reduced rates of applied MeBr.

  10. Measuring and Reducing College Students' Procrastination

    ERIC Educational Resources Information Center

    Perrin, Christopher J.; Miller, Neal; Haberlin, Alayna T.; Ivy, Jonathan W.; Meindl, James N.; Neef, Nancy A.

    2011-01-01

    We examined college students' procrastination when studying for weekly in-class quizzes. Two schedules of online practice quiz delivery were compared using a multiple baseline design. When online study material was made available noncontingently, students usually procrastinated. When access to additional study material was contingent on completing…

  11. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... related performance budgets, resources, and schedules. It should provide a mutual understanding of the inherent risks in offerors'/contractors' performance plans and the underlying management control systems... objectives of the scope of work; (2) Adequacy of the time allocated for performing the defined tasks to...

  12. Software Cost-Estimation Model

    NASA Technical Reports Server (NTRS)

    Tausworthe, R. C.

    1985-01-01

    Software Cost Estimation Model SOFTCOST provides automated resource and schedule model for software development. Combines several cost models found in open literature into one comprehensive set of algorithms. Compensates for nearly fifty implementation factors relative to size of task, inherited baseline, organizational and system environment and difficulty of task.

  13. Relieving the Time Squeeze? Effects of a White-Collar Workplace Change on Parents

    PubMed Central

    Hill, Rachelle; Tranby, Eric; Kelly, Erin; Moen, Phyllis

    2013-01-01

    Employed parents perceive a time squeeze even as trends from the 1960s show they are spending more time with their children. Work conditions (e.g., hours and schedule control) would seem to affect both parents’ time with children and perceived time squeeze, but most studies rely on cross-sectional data that do not establish causality. The authors examined the effects of the introduction of a workplace flexibility initiative (Results Only Work Environment [ROWE]) on changes in mothers’ and fathers’ perceptions of the adequacy of their time with children and actual time spent with children (N = 225). Baseline data show the importance of work conditions for parents’ sense of perceived time adequacy. Panel data show that mothers (but not fathers) in ROWE report increased schedule control and improved time adequacy, but no change in actual time spent with children, except that ROWE increases evening meals with children for mothers sharing few meals at baseline. PMID:24436498

  14. Viral blips during suppressive antiretroviral treatment are associated with high baseline HIV-1 RNA levels.

    PubMed

    Sörstedt, Erik; Nilsson, Staffan; Blaxhult, Anders; Gisslén, Magnus; Flamholc, Leo; Sönnerborg, Anders; Yilmaz, Aylin

    2016-06-21

    Many HIV-1-infected patients on suppressive antiretroviral therapy (ART) have transiently elevated HIV RNA levels. The clinical significance of these viral blips is uncertain. We have determined the incidence of blips and investigated important associations in the Swedish HIV-cohort. HIV-1-infected ART naïve adults who commenced ART 2007-2013 were retrospectively included. Viral blips were defined as a transient viral load between 50 and 500 copies/mL Subjects not suppressed after six months on ART were excluded. Viral blips were found in 76/735 included subjects (10.3 %) and in 90/4449 samples (2.0 %). Median blip viral load was 76 copies/mL (range 56-138). Median follow-up time was 170 weeks (range 97-240). Baseline viral load was higher in subjects with viral blips (median log10 4.85 copies/mL) compared with subjects without blips (median log10 4.55 copies/mL) (p < 0.01). There was a significant association between viral blips and risk for subsequent virological failure (p < 0.001). The Swedish national HIV-cohort has a low incidence of viral blips (10 %). Blips were associated with high baseline viral load and an increased risk of subsequent virological failure.

  15. Military Free Fall Scheduling And Manifest Optimization Model

    DTIC Science & Technology

    2016-12-01

    engines running waiting for the next student load. The annual blade hour cost, which consists of fuel, maintenance, and personnel, is $5.6M for FY-16...tarmac with engines running waiting for the next student load (J. Enke, personal communication, 2016). The annual blade hour cost, which consists of...33 Scenario 2 Nonstandard Run #1 C-27 Two Passes per Lift .......................34 Table 9. xii THIS PAGE INTENTIONALLY LEFT BLANK xiii

  16. 40 CFR 52.876 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., 1974. Continental Grain Co., rail car loading Hutchinson 28-19-50 Aug. 15, 1974. Far-Mar-Co, Inc... & Foundry, cupola Wichita 28-19-20A, 28-19-50A Oct. 4, 1974. Kansas Army Ammunition Plant, open burning...

  17. Improving ETMS Default Route Assignment

    DOT National Transportation Integrated Search

    2005-01-01

    Twenty-four hours before a scheduled flight departs, data on this flight from the Official Airline Guide (OAG) is loaded into the Enhanced Traffic Management System (ETMS). This flight is then included in the Monitor/Alert demand predictions that ETM...

  18. Aeroelastic considerations for torsionally soft rotors

    NASA Technical Reports Server (NTRS)

    Mantay, W. R.; Yeager, W. T., Jr.

    1985-01-01

    A research study was initiated to systematically determine the impact of selected blade tip geometric parameters on conformable rotor performance and loads characteristics. The model articulated rotors included baseline and torsionally soft blades with interchangeable tips. Seven blade tip designs were evaluated on the baseline rotor and six tip designs were tested on the torsionally soft blades. The designs incorporated a systemmatic variation in geometric parameters including sweep, taper, and anhedral. The rotors were evaluated in the NASA Langley Transonic Dynamics Tunnel at several advance ratios, lift and propulsive force values, and tip Mach numbers. A track sensitivity study was also conducted at several advance ratios for both rotors. Based on the test results, tip parameter variations generated significant rotor performance and loads differences for both baseline and torsionally soft blades.

  19. Based new WiMax simulation model to investigate Qos with OPNET modeler in sheduling environment

    NASA Astrophysics Data System (ADS)

    Saini, Sanju; Saini, K. K.

    2012-11-01

    WiMAX stands for World Interoperability for Microwave Access. It is considered a major part of broadband wireless network having the IEEE 802.16 standard. WiMAX provides innovative, fixed as well as mobile platforms for broadband internet access anywhere anytime with different transmission modes. The results show approximately equal load and throughput while the delay values vary among the different Base Stations Introducing the various type of scheduling algorithm, like FIFO,PQ,WFQ, for comparison of four type of scheduling service, with its own QoS needs and also introducing OPNET modeler support for Worldwide Interoperability for Microwave Access (WiMAX) network. The simulation results indicate the correctness and the effectiveness of this algorithm. This paper presents a WiMAX simulation model designed with OPNET modeler 14 to measure the delay, load and the throughput performance factors.

  20. Transport and installation of the Dark Energy Survey CCD imager

    NASA Astrophysics Data System (ADS)

    Derylo, Greg; Chi, Edward; Diehl, H. Thomas; Estrada, Juan; Flaugher, Brenna; Schultz, Ken

    2012-09-01

    The Dark Energy Survey CCD imager was constructed at the Fermi National Accelerator Laboratory and delivered to the Cerro Tololo Inter-American Observatory in Chile for installation onto the Blanco 4m telescope. Several efforts are described relating to preparation of the instrument for transport, development and testing of a shipping crate designed to minimize transportation loads transmitted to the camera, and inspection of the imager upon arrival at the observatory. Transportation loads were monitored and are described. For installation of the imager at the telescope prime focus, where it mates with its previously-installed optical corrector, specialized tooling was developed to safely lift, support, and position the vessel. The installation and removal processes were tested on the Telescope Simulator mockup at FNAL, thus minimizing technical and schedule risk for the work performed at CTIO. Final installation of the imager is scheduled for August 2012.

  1. Evaluation of muscle activity for loaded and unloaded dynamic squats during vertical whole-body vibration.

    PubMed

    Hazell, Tom J; Kenno, Kenji A; Jakobi, Jennifer M

    2010-07-01

    The purpose of this investigation was to examine if the addition of a light external load would enhance whole-body vibration (WBV)-induced increases in muscle activity during dynamic squatting in 4 leg muscles. Thirteen recreationally active male university students performed a series of dynamic squats (unloaded with no WBV, unloaded with WBV, loaded with no WBV, and loaded with WBV). The load was set to 30% of body mass and WBV included 25-, 35-, and 45-Hz frequencies with 4-mm amplitude. Muscle activity was recorded with surface electromyography (EMG) on the vastus lateralis (VL), biceps femoris (BF), tibialis anterior (TA), and gastrocnemius (GC) and is reported as EMGrms (root mean square) normalized to %maximal voluntary exertion. During unloaded dynamic squats, exposure to WBV (45 Hz) significantly (p < 0.05) increased baseline muscle activity in all muscles, except the TA compared with no WBV. Adding a light external load without WBV increased baseline muscle activity of the squat exercise in all muscles but decreased the TA. This loaded level of muscle activity was further increased with WBV (45 Hz) in all muscles. The WBV-induced increases in muscle activity in the loaded condition (approximately 3.5%) were of a similar magnitude to the WBV-induced increases during the unloaded condition (approximately 2.5%) demonstrating the addition of WBV to unloaded or loaded dynamic squatting results in an increase in muscle activity. These results demonstrate the potential effectiveness of using external loads with exposure to WBV.

  2. Human papillomavirus vaccination coverage using two-dose or three-dose schedule criteria.

    PubMed

    Lin, Xia; Rodgers, Loren; Zhu, Liping; Stokley, Shannon; Meites, Elissa; Markowitz, Lauri E

    2017-10-13

    In October 2016, the Advisory Committee on Immunization Practices (ACIP) updated the human papillomavirus (HPV) vaccination recommendation to include a 2-dose schedule for U.S. adolescents initiating the vaccine series before their 15th birthday. We analyzed records for >4million persons aged 9-17years receiving any HPV vaccine by the end of each quarter during January 1, 2014-September 30, 2016 from six Immunization Information Systems Sentinel Sites, and reclassified HPV vaccination up-to-date coverage according to the updated recommendations. Compared with HPV vaccination up-to-date coverage by the 3-dose schedule only, including criteria for either a 2-dose or 3-dose schedule increased up-to-date coverage in 11-12, 13-14, and 15-17 year-olds by 4.5-8.5 percentage points. The difference between 3-dose up-to-date coverage and 2- or 3-dose up-to-date coverage was greatest in late 2016. These data provide baseline HPV vaccination coverage using current ACIP recommendations. Published by Elsevier Ltd.

  3. Phase C/D program development plan. Volume 1: Program plan

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.

  4. Reduction of characteristic RL time for fast, efficient magnetic levitation

    NASA Astrophysics Data System (ADS)

    Li, Yuqing; Feng, Guosheng; Wang, Xiaofeng; Wu, Jizhou; Ma, Jie; Xiao, Liantuan; Jia, Suotang

    2017-09-01

    We demonstrate the reduction of characteristic time in resistor-inductor (RL) circuit for fast, efficient magnetic levitation according to Kirchhoff's circuit laws. The loading time is reduced by a factor of ˜4 when a high-power resistor is added in series with the coils. By using the controllable output voltage of power supply and voltage of feedback circuit, the loading time is further reduced by ˜ 3 times. The overshoot loading in advance of the scheduled magnetic field gradient is equivalent to continuously adding a resistor without heating. The magnetic field gradient with the reduced loading time is used to form the upward magnetic force against to the gravity of the cooled Cs atoms, and we obtain an effectively levitated loading of the Cs atoms to a crossed optical dipole trap.

  5. Non-Intrusive Load Monitoring Approaches for Disaggregated Energy Sensing: A Survey

    PubMed Central

    Zoha, Ahmed; Gluhak, Alexander; Imran, Muhammad Ali; Rajasegarar, Sutharshan

    2012-01-01

    Appliance Load Monitoring (ALM) is essential for energy management solutions, allowing them to obtain appliance-specific energy consumption statistics that can further be used to devise load scheduling strategies for optimal energy utilization. Fine-grained energy monitoring can be achieved by deploying smart power outlets on every device of interest; however it incurs extra hardware cost and installation complexity. Non-Intrusive Load Monitoring (NILM) is an attractive method for energy disaggregation, as it can discern devices from the aggregated data acquired from a single point of measurement. This paper provides a comprehensive overview of NILM system and its associated methods and techniques used for disaggregated energy sensing. We review the state-of-the art load signatures and disaggregation algorithms used for appliance recognition and highlight challenges and future research directions. PMID:23223081

  6. Effects of Airport Tower Controller Decision Support Tool on Controllers Head-Up Time

    NASA Technical Reports Server (NTRS)

    Hayashi, Miwa; Cruz Lopez, Jose M.

    2013-01-01

    Despite that aircraft positions and movements can be easily monitored on the radar displays at major airports nowadays, it is still important for the air traffic control tower (ATCT) controllers to look outside the window as much as possible to assure safe operations of traffic management. The present paper investigates whether an introduction of the NASA's proposed Spot and Runway Departure Advisor (SARDA), a decision support tool for the ATCT controller, would increase or decrease the controllers' head-up time. SARDA provides the controller departure-release schedule advisories, i.e., when to release each departure aircraft in order to minimize individual aircraft's fuel consumption on taxiways and simultaneously maximize the overall runway throughput. The SARDA advisories were presented on electronic flight strips (EFS). To investigate effects on the head-up time, a human-in-the-loop simulation experiment with two retired ATCT controller participants was conducted in a high-fidelity ATCT cab simulator with 360-degree computer-generated out-the-window view. Each controller participant wore a wearable video camera on a side of their head with the camera facing forward. The video data were later used to calculate their line of sight at each moment and eventually identify their head-up times. Four sessions were run with the SARDA advisories, and four sessions were run without (baseline). Traffic-load levels were varied in each session. The same set of user interface - EFS and the radar displays - were used in both the advisory and baseline sessions to make them directly comparable. The paper reports the findings and discusses their implications.

  7. STS-58 crewmembers participate in baseline data collection

    NASA Image and Video Library

    1993-09-29

    S93-45367 (29 Sept 1993) --- Astronaut Rhea Seddon, STS-58 payload commander, participates in biomedical data collection. The seven member crew spent an entire day recording important pre-flight data in preparation for the two week Spacelab Life Sciences (SLS-2) mission, scheduled for next month.

  8. The scheduling of tracking times for interplanetary spacecraft on the Deep Space Network

    NASA Technical Reports Server (NTRS)

    Webb, W. A.

    1978-01-01

    The Deep Space Network (DSN) is a network of tracking stations, located throughout the globe, used to track spacecraft for NASA's interplanetary missions. This paper describes a computer program, DSNTRAK, which provides an optimum daily tracking schedule for the DSN given the view periods at each station for a mission set of n spacecraft, where n is between 2 and 6. The objective function is specified in terms of relative total daily tracking time requirements between the n spacecraft. Linear programming is used to maximize the total daily tracking time and determine an optimal daily tracking schedule consistent with DSN station capabilities. DSNTRAK is used as part of a procedure to provide DSN load forecasting information for proposed future NASA mission sets.

  9. No Exacerbation of Knee Joint Pain and Effusion Following Preoperative Progressive Resistance Training in Patients Scheduled for Total Knee Arthroplasty: Secondary Analyses From a Randomized Controlled Trial.

    PubMed

    Skoffer, Birgit; Dalgas, Ulrik; Maribo, Thomas; Søballe, Kjeld; Mechlenburg, Inger

    2017-11-09

    Preoperative progressive resistance training (PRT) is controversial in patients scheduled for total knee arthroplasty (TKA), because of the concern that it may exacerbate knee joint pain and effusion. To examine whether preoperative PRT initiated 5 weeks prior to TKA would exacerbate pain and knee effusion, and would allow a progressively increased training load throughout the training period that would subsequently increase muscle strength. Secondary analyses from a randomized controlled trial. University Hospital and a Regional Hospital. A total of 30 patients who were scheduled for TKA due to osteoarthritis and assigned as the intervention group. Patients underwent unilateral PRT (3 sessions per week). Exercise loading was 12 repetitions maximum (RM) with progression toward 8 RM. The training program consisted of 6 exercises performed unilaterally. Before and after each training session, knee joint pain was rated on an 11-point scale, effusion was assessed by measuring the knee joint circumference, and training load was recorded. The first and last training sessions were initiated by 1 RM testing of unilateral leg press, unilateral knee extension, and unilateral knee flexion. The median pain change score from before to after each training session was 0 at all training sessions. The average increase in knee joint effusion across the 12 training sessions was a mean 0.16 cm ± 0.23 cm. No consistent increase in knee joint effusion after training sessions during the training period was found (P = .21). Training load generally increased, and maximal muscle strength improved as follows: unilateral leg press: 18% ± 30% (P = .03); unilateral knee extension: 81% ± 156% (P < .001); and unilateral knee flexion: 53% ± 57% (P < .001). PRT of the affected leg initiated shortly before TKA does not exacerbate knee joint pain and effusion, despite a substantial progression in loading and increased muscle strength. Concerns for side effects such as pain and effusion after PRT seem unfounded. To be determined. Copyright © 2017. Published by Elsevier Inc.

  10. Baseline and Multimodal UAV GCS Interface Design

    DTIC Science & Technology

    2013-07-01

    complete a computerized version of the NASA - TLX assessment of perceived mental workload. 2.3 Results The baseline condition ran smoothly and with...System MALE Medium-altitude, Long-endurance NASA - TLX NASA Task Load Index SA Situation Awareness TDT Tucker Davis Technologies UAV Uninhabited Aerial

  11. AGM-88E Advanced Anti-Radiation Guided Missile (AGM-88E AARGM)

    DTIC Science & Technology

    2015-12-01

    0.0 0.0 Acq O&M 0.0 0.0 -- 0.0 0.0 0.0 0.0 Total 1528.5 1661.1 N/A 2107.4 1861.4 2026.2 2663.7 1 APB Breach Confidence Level Confidence Level of...normal conditions, encountering average levels of technical, schedule, and programmatic risk and external interference. Based on the rigor in methods...SAR Baseline to Current SAR Baseline (TY $M) Initial PAUC Development Estimate Changes PAUC Production Estimate Econ Qty Sch Eng Est Oth Spt Total

  12. Operations research methods improve chemotherapy patient appointment scheduling.

    PubMed

    Santibáñez, Pablo; Aristizabal, Ruben; Puterman, Martin L; Chow, Vincent S; Huang, Wenhai; Kollmannsberger, Christian; Nordin, Travis; Runzer, Nancy; Tyldesley, Scott

    2012-12-01

    Clinical complexity, scheduling restrictions, and outdated manual booking processes resulted in frequent clerical rework, long waitlists for treatment, and late appointment notification for patients at a chemotherapy clinic in a large cancer center in British Columbia, Canada. A 17-month study was conducted to address booking, scheduling and workload issues and to develop, implement, and evaluate solutions. A review of scheduling practices included process observation and mapping, analysis of historical appointment data, creation of a new performance metric (final appointment notification lead time), and a baseline patient satisfaction survey. Process improvement involved discrete event simulation to evaluate alternative booking practice scenarios, development of an optimization-based scheduling tool to improve scheduling efficiency, and change management for implementation of process changes. Results were evaluated through analysis of appointment data, a follow-up patient survey, and staff surveys. Process review revealed a two-stage scheduling process. Long waitlists and late notification resulted from an inflexible first-stage process. The second-stage process was time consuming and tedious. After a revised, more flexible first-stage process and an automated second-stage process were implemented, the median percentage of appointments exceeding the final appointment notification lead time target of one week was reduced by 57% and median waitlist size decreased by 83%. Patient surveys confirmed increased satisfaction while staff feedback reported reduced stress levels. Significant operational improvements can be achieved through process redesign combined with operations research methods.

  13. BEHAVIORAL MOMENTUM AND ACCUMULATION OF MASS IN MULTIPLE SCHEDULES

    PubMed Central

    Craig, Andrew R.; Cunningham, Paul J.; Shahan, Timothy A.

    2015-01-01

    Behavioral momentum theory suggests that the relation between a discriminative-stimulus situation and reinforcers obtained in that context (i.e., the Pavlovian stimulus–reinforcer relation) governs persistence of operant behavior. Within the theory, a mass-like aspect of behavior has been shown to be a power function of predisruption reinforcement rates. Previous investigations of resistance to change in multiple schedules, however, have been restricted to examining response persistence following protracted periods of stability in reinforcer rates within a discriminative situation. Thus, it is unclear how long a stimulus–reinforcer relation must be in effect prior to disruption in order to affect resistance to change. The present experiment examined resistance to change of pigeon’s key pecking following baseline conditions where reinforcer rates that were correlated with discriminative-stimulus situations changed. Across conditions, one multiple-schedule component arranged either relatively higher rates or lower rates of variable-interval food delivery, while the other component arranged the opposite rate. These schedules alternated between multiple-schedule components across blocks of sessions such that reinforcer rates in the components were held constant for 20, 5, 3, 2, or 1 session(s) between alternations. Resistance to extinction was higher in the component that most recently was associated with higher rates of food delivery in all conditions except when schedules alternated daily or every other day. These data suggest that resistance to change in multiple schedules is related to recently experienced reinforcer rates but only when multiple-schedule components are associated with specific reinforcer rates for several sessions. PMID:25787824

  14. Effects of an Advanced Sleep Schedule and Morning Short Wavelength Light Exposure on Circadian Phase in Young Adults with Late Sleep Schedules

    PubMed Central

    Sharkey, Katherine M.; Carskadon, Mary A.; Figueiro, Mariana G.; Zhu, Yong; Rea, Mark S.

    2011-01-01

    Objective We examined the effects of an advanced sleep/wake schedule and morning short wavelength (blue) light in 25 adults (mean age±SD = 21.8±3 years; 13 women) with late sleep schedules and subclinical features of delayed sleep phase syndrome (DSPD). Methods After a baseline week, participants kept individualized, fixed, advanced 7.5-hour sleep schedules for 6 days. Participants were randomly assigned to groups to receive “blue” (470 nm, ~225 lux, n=12) or “dim” (< 1 lux, n=13) light for one hour after waking each day. Head-worn “Daysimeters” measured light exposure; actigraphs and sleep diaries confirmed schedule compliance. Salivary dim light melatonin onset (DLMO), self-reported sleep, and mood were examined with 2×2 ANOVA. Results After 6 days, both groups showed significant circadian phase advances, but morning blue-light was not associated with larger phase shifts than dim-light exposure. The average DLMO advances (mean±SD) were 1.5±1.1 hours in the dim light group and 1.4±0.7 hours in the blue light group. Conclusions Adherence to a fixed advanced sleep/wake schedule resulted in significant circadian phase shifts in young adults with subclinical DSPD with or without morning blue light exposure. Light/dark exposures associated with fixed early sleep schedules are sufficient to advance circadian phase in young adults. PMID:21704557

  15. Effects of an advanced sleep schedule and morning short wavelength light exposure on circadian phase in young adults with late sleep schedules.

    PubMed

    Sharkey, Katherine M; Carskadon, Mary A; Figueiro, Mariana G; Zhu, Yong; Rea, Mark S

    2011-08-01

    We examined the effects of an advanced sleep/wake schedule and morning short wavelength (blue) light in 25 adults (mean age±SD=21.8±3 years; 13 women) with late sleep schedules and subclinical features of delayed sleep phase disorder (DSPD). After a baseline week, participants kept individualized, fixed, advanced 7.5-h sleep schedules for 6days. Participants were randomly assigned to groups to receive "blue" (470nm, ∼225lux, n=12) or "dim" (<1lux, n=13) light for 1h after waking each day. Head-worn "Daysimeters" measured light exposure; actigraphs and sleep diaries confirmed schedule compliance. Salivary dim light melatonin onset (DLMO), self-reported sleep, and mood were examined with 2×2 ANOVA. After 6days, both groups showed significant circadian phase advances, but morning blue light was not associated with larger phase shifts than dim-light exposure. The average DLMO advances (mean±SD) were 1.5±1.1h in the dim light group and 1.4±0.7h in the blue light group. Adherence to a fixed advanced sleep/wake schedule resulted in significant circadian phase shifts in young adults with subclinical DSPD with or without morning blue light exposure. Light/dark exposures associated with fixed early sleep schedules are sufficient to advance circadian phase in young adults. Copyright © 2011 Elsevier B.V. All rights reserved.

  16. Advanced Intelligent System Application to Load Forecasting and Control for Hybrid Electric Bus

    NASA Technical Reports Server (NTRS)

    Momoh, James; Chattopadhyay, Deb; Elfayoumy, Mahmoud

    1996-01-01

    The primary motivation for this research emanates from providing a decision support system to the electric bus operators in the municipal and urban localities which will guide the operators to maintain an optimal compromise among the noise level, pollution level, fuel usage etc. This study is backed up by our previous studies on study of battery characteristics, permanent magnet DC motor studies and electric traction motor size studies completed in the first year. The operator of the Hybrid Electric Car must determine optimal power management schedule to meet a given load demand for different weather and road conditions. The decision support system for the bus operator comprises three sub-tasks viz. forecast of the electrical load for the route to be traversed divided into specified time periods (few minutes); deriving an optimal 'plan' or 'preschedule' based on the load forecast for the entire time-horizon (i.e., for all time periods) ahead of time; and finally employing corrective control action to monitor and modify the optimal plan in real-time. A fully connected artificial neural network (ANN) model is developed for forecasting the kW requirement for hybrid electric bus based on inputs like climatic conditions, passenger load, road inclination, etc. The ANN model is trained using back-propagation algorithm employing improved optimization techniques like projected Lagrangian technique. The pre-scheduler is based on a Goal-Programming (GP) optimization model with noise, pollution and fuel usage as the three objectives. GP has the capability of analyzing the trade-off among the conflicting objectives and arriving at the optimal activity levels, e.g., throttle settings. The corrective control action or the third sub-task is formulated as an optimal control model with inputs from the real-time data base as well as the GP model to minimize the error (or deviation) from the optimal plan. These three activities linked with the ANN forecaster proving the output to the GP model which in turn produces the pre-schedule of the optimal control model. Some preliminary results based on a hypothetical test case will be presented for the load forecasting module. The computer codes for the three modules will be made available fe adoption by bus operating agencies. Sample results will be provided using these models. The software will be a useful tool for supporting the control systems for the Electric Bus project of NASA.

  17. Flight attendant fatigue : a quantitative review of flight attendant comments.

    DOT National Transportation Integrated Search

    2011-10-01

    Todays aviation industry is a 24/7 operation that produces a variety of challenges for cabin crew members : including extended duty periods, highly variable schedules, frequent time zone changes, and increased passenger : loads. The present conten...

  18. Trajectories of Substance Use Disorder in Youth After Detention: A 12-Year Longitudinal Study.

    PubMed

    Welty, Leah J; Hershfield, Jennifer A; Abram, Karen M; Han, Hongyun; Byck, Gayle R; Teplin, Linda A

    2017-02-01

    To identify trajectories of substance use disorders (SUDs) in youth during the 12 years after detention and how gender, race/ethnicity, and age at baseline predict trajectories. As part of the Northwestern Juvenile Project, a longitudinal study of 1,829 youth randomly sampled from detention in Chicago, Illinois from 1995 through 1998, participants were reinterviewed in the community or correctional facilities up to 9 times over 12 years. Independent interviewers assessed SUDs using the Diagnostic Interview Schedule for Children 2.3 (baseline) and the Diagnostic Interview Schedule IV (follow-ups). Primary outcome was a mutually exclusive 5-category typology of disorder: no SUD, alcohol alone, marijuana alone, comorbid alcohol and marijuana, or "other" illicit ("hard") drug. Trajectories were estimated using growth mixture models with a 3-category ordinal variable derived from the typology. During the 12-year follow-up, 19.6% of youth did not have an SUD. The remaining 81.4% were in 3 trajectory classes. Class 1 (24.5%), a bell-shaped trajectory, peaked 5 years after baseline when 42.7% had an SUD and 12.5% had comorbid or "other" illicit drug disorders. Class 2 (41.3%) had a higher prevalence of SUD at baseline, 73.8%. Although prevalence decreased over time, 23.5% had an SUD 12 years later. Class 3 (14.6%), the most serious and persistent trajectory, had the highest prevalence of comorbid or "other" illicit drug disorders-52.1% at baseline and 17.4% 12 years later. Males, Hispanics, non-Hispanic whites, and youth who were older at baseline (detention) had the worst outcomes. Gender, race/ethnicity, and age at detention predict trajectories of SUDs in delinquent youth. Findings provide an empirical basis for child psychiatry to address health disparities and improve prevention. Copyright © 2016 American Academy of Child and Adolescent Psychiatry. Published by Elsevier Inc. All rights reserved.

  19. Reliability Constrained Priority Load Shedding for Aerospace Power System Automation

    NASA Technical Reports Server (NTRS)

    Momoh, James A.; Zhu, Jizhong; Kaddah, Sahar S.; Dolce, James L. (Technical Monitor)

    2000-01-01

    The need for improving load shedding on board the space station is one of the goals of aerospace power system automation. To accelerate the optimum load-shedding functions, several constraints must be involved. These constraints include congestion margin determined by weighted probability contingency, component/system reliability index, generation rescheduling. The impact of different faults and indices for computing reliability were defined before optimization. The optimum load schedule is done based on priority, value and location of loads. An optimization strategy capable of handling discrete decision making, such as Everett optimization, is proposed. We extended Everett method to handle expected congestion margin and reliability index as constraints. To make it effective for real time load dispatch process, a rule-based scheme is presented in the optimization method. It assists in selecting which feeder load to be shed, the location of the load, the value, priority of the load and cost benefit analysis of the load profile is included in the scheme. The scheme is tested using a benchmark NASA system consisting of generators, loads and network.

  20. Baseline LAW Glass Formulation Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kruger, Albert A.; Mooers, Cavin; Bazemore, Gina

    2013-06-13

    The major objective of the baseline glass formulation work was to develop and select glass formulations that are compliant with contractual and processing requirements for each of the LAW waste streams. Other objectives of the work included preparation and characterization of glasses with respect to the properties of interest, optimization of sulfate loading in the glasses, evaluation of ability to achieve waste loading limits, testing to demonstrate compatibility of glass melts with melter materials of construction, development of glass formulations to support ILAW qualification activities, and identification of glass formulation issues with respect to contract specifications and processing requirements.

  1. Effect of Embedded Piezoelectric Sensors on Fracture Toughness and Fatigue Resistance of Composite Laminates Under Mode I Loading

    NASA Technical Reports Server (NTRS)

    Murri, Gretchen B.

    2006-01-01

    Double-cantilevered beam (DCB) specimens of a glass/epoxy composite material with embedded piezoelectric sensors were tested both statically and under fatigue loading to determine the effect of the embedded material on the Mode I fracture toughness and fatigue resistance compared to baseline data without the embedded elements. A material known as LaRC-Macrofiber Composite (LaRC-MFC (TradeMark)), or MFC, was embedded at the midplane of the specimen during the layup. Specimens were manufactured with the embedded MFC material either at the loaded end of the specimen to simulate an initial delamination; or with the MFC material located at the delaminating interface, with a Teflon film at the loaded end to simulate an initial delamination. There were three types of specimens with the embedded material at the delaminating interface: co-cured with no added adhesive; cured with a paste adhesive applied to the embedded element; or cured with a film adhesive added to the embedded material. Tests were conducted with the sensors in both the passive and active states. Results were compared to baseline data for the same material without embedded elements. Interlaminar fracture toughness values (G(sub Ic)) for the passive condition showed little change when the MFC was at the insert end. Passive results varied when the MFC was at the delaminating interface. For the co-cured case and with the paste adhesive, G(sub Ic) decreased compared to the baseline toughness, whereas, for the film adhesive case, G(sub Ic) was significantly greater than the baseline toughness, but the failure was always catastrophic. When the MFC was in the active state, G(sub Ic) was generally lower compared to the passive results. Fatigue tests showed little effect of the embedded material whether it was active or passive compared to baseline values.

  2. OA-7 Cargo Module Loading

    NASA Image and Video Library

    2017-02-07

    In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, thousands of pounds of supplies, equipment and scientific research materials are prepared for loading aboard a Cygnus spacecraft's pressurized cargo module (PCM) for the Orbital ATK CRS-7 mission to the International Space Station. Scheduled to launch on March 19, 2017, the commercial resupply services mission will lift off atop a United Launch Alliance Atlas V rocket from Space launch Complex 41 at Cape Canaveral Air Force Station.

  3. Development of an Open Building Automation System Specification Based on ANSI/ASHRAE 135-2004 (BACnet(R) Communications Protocol: A Technical Assessment

    DTIC Science & Technology

    2007-02-01

    on/off control), trending and trend reports, load shedding/load manage- ment, remote setpoint adjustment, initial diagnosis of a service call and...building-specific operational data such as on/off scheduling com- mands, setpoints , and outside air temperature. With help from several other agencies and...interface for monitoring 3. Provide one interface for device/system management/configuration 4. ( Optimally ) provide one interface for device

  4. Development of an Open Building Automation System Specification Based on ANSI/ASHRAE 135-2004 (BACnet(Registered) Communications Protocol): A Technical Assessment

    DTIC Science & Technology

    2007-02-01

    on/off control), trending and trend reports, load shedding/load manage- ment, remote setpoint adjustment, initial diagnosis of a service call and...building-specific operational data such as on/off scheduling com- mands, setpoints , and outside air temperature. With help from several other agencies and...interface for monitoring 3. Provide one interface for device/system management/configuration 4. ( Optimally ) provide one interface for device

  5. Further Studies of Aerodynamic Loads at Spin Entry

    DTIC Science & Technology

    1977-06-30

    the model and the loads on the model for a research coafiguration having certain essential features of a modern fighter-bomber aircraft, since no such...percent at the tip. The model is geometrically similar to that described in reference 3 but approximately 2.4 times larger. The NASA model is designed to...measurements turned out to be extremely time consuming. Even though the V/STOL tunnel staff granted three additional days over the 10 originally scheduled for

  6. Scandinavia studies of recent crustal movements and the space geodetic baseline network

    NASA Technical Reports Server (NTRS)

    Anderson, A. J.

    1980-01-01

    A brief review of crustal movements within the Fenno-Scandia shield is given. Results from postglacial studies, projects for measuring active fault regions, and dynamic ocean loading experiments are presented. The 1979 Scandinavian Doppler Campaign Network is discussed. This network includes Doppler translocation baseline determination of future very long baseline interferometry baselines to be measured in Scandinavia. Intercomparison of earlier Doppler translocation measurements with a high precision terrestrial geodetic baseline in Scandinavia has yielded internal agreement of 6 cm over 887 km. This is a precision of better than 1 part in to the 7th power.

  7. Optimal Decentralized Protocol for Electric Vehicle Charging

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gan, LW; Topcu, U; Low, SH

    We propose a decentralized algorithm to optimally schedule electric vehicle (EV) charging. The algorithm exploits the elasticity of electric vehicle loads to fill the valleys in electric load profiles. We first formulate the EV charging scheduling problem as an optimal control problem, whose objective is to impose a generalized notion of valley-filling, and study properties of optimal charging profiles. We then give a decentralized algorithm to iteratively solve the optimal control problem. In each iteration, EVs update their charging profiles according to the control signal broadcast by the utility company, and the utility company alters the control signal to guidemore » their updates. The algorithm converges to optimal charging profiles (that are as "flat" as they can possibly be) irrespective of the specifications (e.g., maximum charging rate and deadline) of EVs, even if EVs do not necessarily update their charging profiles in every iteration, and use potentially outdated control signal when they update. Moreover, the algorithm only requires each EV solving its local problem, hence its implementation requires low computation capability. We also extend the algorithm to track a given load profile and to real-time implementation.« less

  8. Research on wind power grid-connected operation and dispatching strategies of Liaoning power grid

    NASA Astrophysics Data System (ADS)

    Han, Qiu; Qu, Zhi; Zhou, Zhi; He, Xiaoyang; Li, Tie; Jin, Xiaoming; Li, Jinze; Ling, Zhaowei

    2018-02-01

    As a kind of clean energy, wind power has gained rapid development in recent years. Liaoning Province has abundant wind resources and the total installed capacity of wind power is in the forefront. With the large-scale wind power grid-connected operation, the contradiction between wind power utilization and peak load regulation of power grid has been more prominent. To this point, starting with the power structure and power grid installation situation of Liaoning power grid, the distribution and the space-time output characteristics of wind farm, the prediction accuracy, the curtailment and the off-grid situation of wind power are analyzed. Based on the deep analysis of the seasonal characteristics of power network load, the composition and distribution of main load are presented. Aiming at the problem between the acceptance of wind power and power grid adjustment, the scheduling strategies are given, including unit maintenance scheduling, spinning reserve, energy storage equipment settings by the analysis of the operation characteristics and the response time of thermal power units and hydroelectric units, which can meet the demand of wind power acceptance and provide a solution to improve the level of power grid dispatching.

  9. The application of statistically designed experiments to resistance spot welding

    NASA Technical Reports Server (NTRS)

    Hafley, Robert A.; Hales, Stephen J.

    1991-01-01

    State-of-the-art Resistance Spot Welding (RSW) equipment has the potential to permit realtime monitoring of operations through advances in computerized process control. In order to realize adaptive feedback capabilities, it is necessary to establish correlations among process variables, welder outputs, and weldment properties. The initial step toward achieving this goal must involve assessment of the effect of specific process inputs and the interactions among these variables on spot weld characteristics. This investigation evaluated these effects through the application of a statistically designed experiment to the RSW process. A half-factorial, Taguchi L sub 16 design was used to understand and refine a RSW schedule developed for welding dissimilar aluminum-lithium alloys of different thickness. The baseline schedule had been established previously by traditional trial and error methods based on engineering judgment and one-factor-at-a-time studies. A hierarchy of inputs with respect to each other was established, and the significance of these inputs with respect to experimental noise was determined. Useful insight was gained into the effect of interactions among process variables, particularly with respect to weldment defects. The effects of equipment related changes associated with disassembly and recalibration were also identified. In spite of an apparent decrease in equipment performance, a significant improvement in the maximum strength for defect-free welds compared to the baseline schedule was achieved.

  10. Design study of RL10 derivatives. Volume 3, part 1: Preliminary interface control document. [development of baseline engines for space tug vehicles

    NASA Technical Reports Server (NTRS)

    Adams, A.

    1973-01-01

    The Interface Control Document contains engine information necessary for installation of the baseline RL10 Derivative engines in the Space Tug vehicle. The ICD presents a description of the baseline engines and their operating characteristics, mass and load characteristics, and environmental criteria. The document defines the engine/vehicle mechanical, electrical, fluid and pneumatic interface requirements.

  11. 75 FR 37787 - Combined Notice of Filings # 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... proposal to revise the Forward Capacity Market rules. Filed Date: 06/14/2010. Accession Number: 20100615... Succession and a revised rate schedule. Filed Date: 06/22/2010. Accession Number: 20100622-0212. Comment Date.... Description: KGen Hot Spring LLC submits tariff filing per 35.12: Initial Baseline Market Based Rate Tariff...

  12. Infant Sign Training and Functional Analysis

    ERIC Educational Resources Information Center

    Normand, Matthew P.; Machado, Mychal A.; Hustyi, Kristin M.; Morley, Allison J.

    2011-01-01

    We taught manual signs to typically developing infants using a reversal design and caregiver-nominated stimuli. We delivered the stimuli on a time-based schedule during baseline. During the intervention, we used progressive prompting and reinforcement, described by Thompson et al. (2004, 2007), to establish mands. Following sign training, we…

  13. The Research Doesn't Always Apply: Practical Solutions to Evidence-Based Training-Load Monitoring in Elite Team Sports.

    PubMed

    Burgess, Darren J

    2017-04-01

    Research describing load-monitoring techniques for team sport is plentiful. Much of this research is conducted retrospectively and typically involves recreational or semielite teams. Load-monitoring research conducted on professional team sports is largely observational. Challenges exist for the practitioner in implementing peer-reviewed research into the applied setting. These challenges include match scheduling, player adherence, manager/coach buy-in, sport traditions, and staff availability. External-load monitoring often attracts questions surrounding technology reliability and validity, while internal-load monitoring makes some assumptions about player adherence, as well as having some uncertainty around the impact these measures have on player performance This commentary outlines examples of load-monitoring research, discusses the issues associated with the application of this research in an elite team-sport setting, and suggests practical adjustments to the existing research where necessary.

  14. Airspace Technology Demonstration 2 (ATD-2) Technology Description Document (TDD)

    NASA Technical Reports Server (NTRS)

    Ging, Andrew; Engelland, Shawn; Capps, Al; Eshow, Michelle; Jung, Yoon; Sharma, Shivanjli; Talebi, Ehsan; Downs, Michael; Freedman, Cynthia; Ngo, Tyler; hide

    2018-01-01

    This Technology Description Document (TDD) provides an overview of the technology for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of the National Aeronautics and Space Administration's (NASA) Airspace Technology Demonstration 2 (ATD-2) project, to be demonstrated beginning in 2017 at Charlotte Douglas International Airport (CLT). Development, integration, and field demonstration of relevant technologies of the IADS system directly address recommendations made by the Next Generation Air Transportation System (NextGen) Integration Working Group (NIWG) on Surface and Data Sharing and the Surface Collaborative Decision Making (Surface CDM) concept of operations developed jointly by the Federal Aviation Administration (FAA) and aviation industry partners. NASA is developing the IADS traffic management system under the ATD-2 project in coordination with the FAA, flight operators, CLT airport, and the National Air Traffic Controllers Association (NATCA). The primary goal of ATD-2 is to improve the predictability and operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 project is a 5-year research activity beginning in 2015 and extending through 2020. The Phase 1 Baseline IADS capability resulting from the ATD-2 research will be demonstrated at the CLT airport beginning in 2017. Phase 1 will provide the initial demonstration of the integrated system with strategic and tactical scheduling, tactical departure scheduling to an en route meter point, and an early implementation prototype of a Terminal Flight Data Manager (TFDM) Electronic Flight Data (EFD) system. The strategic surface scheduling element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.

  15. Monte Carlo Simulations for VLBI2010

    NASA Astrophysics Data System (ADS)

    Wresnik, J.; Böhm, J.; Schuh, H.

    2007-07-01

    Monte Carlo simulations are carried out at the Institute of Geodesy and Geophysics (IGG), Vienna, and at Goddard Space Flight Center (GSFC), Greenbelt (USA), with the goal to design a new geodetic Very Long Baseline Interferometry (VLBI) system. Influences of the schedule, the network geometry and the main stochastic processes on the geodetic results are investigated. Therefore schedules are prepared with the software package SKED (Vandenberg 1999), and different strategies are applied to produce temporally very dense schedules which are compared in terms of baseline length repeatabilities. For the simulation of VLBI observations a Monte Carlo Simulator was set up which creates artificial observations by randomly simulating wet zenith delay and clock values as well as additive white noise representing the antenna errors. For the simulation at IGG the VLBI analysis software OCCAM (Titov et al. 2004) was adapted. Random walk processes with power spectrum densities of 0.7 and 0.1 psec2/sec are used for the simulation of wet zenith delays. The clocks are simulated with Allan Standard Deviations of 1*10^-14 @ 50 min and 2*10^-15 @ 15 min and three levels of white noise, 4 psec, 8 psec and, 16 psec, are added to the artificial observations. The variations of the power spectrum densities of the clocks and wet zenith delays, and the application of different white noise levels show clearly that the wet delay is the critical factor for the improvement of the geodetic VLBI system. At GSFC the software CalcSolve is used for the VLBI analysis, therefore a comparison between the software packages OCCAM and CalcSolve was done with simulated data. For further simulations the wet zenith delay was modeled by a turbulence model. This data was provided by Nilsson T. and was added to the simulation work. Different schedules have been run.

  16. Effects of Differential Reinforcement and Rules With Feedback on Preference for Choice and Verbal Reports

    PubMed Central

    Karsina, Allen; Thompson, Rachel H; Rodriguez, Nicole M; Vanselow, Nicholas R

    2012-01-01

    We evaluated the effects of differential reinforcement and accurate verbal rules with feedback on the preference for choice and the verbal reports of 6 adults. Participants earned points on a probabilistic schedule by completing the terminal links of a concurrent-chains arrangement in a computer-based game of chance. In free-choice terminal links, participants selected 3 numbers from an 8-number array; in restricted-choice terminal links participants selected the order of 3 numbers preselected by a computer program. A pop-up box then informed the participants if the numbers they selected or ordered matched or did not match numbers generated by the computer but not displayed; matching in a trial resulted in one point earned. In baseline sessions, schedules of reinforcement were equal across free- and restricted-choice arrangements and a running tally of points earned was shown each trial. The effects of differentially reinforcing restricted-choice selections were evaluated using a reversal design. For 4 participants, the effects of providing a running tally of points won by arrangement and verbal rules regarding the schedule of reinforcement were also evaluated using a nonconcurrent multiple-baseline-across-participants design. Results varied across participants but generally demonstrated that (a) preference for choice corresponded more closely to verbal reports of the odds of winning than to reinforcement schedules, (b) rules and feedback were correlated with more accurate verbal reports, and (c) preference for choice corresponded more highly to the relative number of reinforcements obtained across free- and restricted-choice arrangements in a session than to the obtained probability of reinforcement or to verbal reports of the odds of winning. PMID:22754103

  17. Effects of differential reinforcement and rules with feedback on preference for choice and verbal reports.

    PubMed

    Karsina, Allen; Thompson, Rachel H; Rodriguez, Nicole M; Vanselow, Nicholas R

    2012-01-01

    We evaluated the effects of differential reinforcement and accurate verbal rules with feedback on the preference for choice and the verbal reports of 6 adults. Participants earned points on a probabilistic schedule by completing the terminal links of a concurrent-chains arrangement in a computer-based game of chance. In free-choice terminal links, participants selected 3 numbers from an 8-number array; in restricted-choice terminal links participants selected the order of 3 numbers preselected by a computer program. A pop-up box then informed the participants if the numbers they selected or ordered matched or did not match numbers generated by the computer but not displayed; matching in a trial resulted in one point earned. In baseline sessions, schedules of reinforcement were equal across free- and restricted-choice arrangements and a running tally of points earned was shown each trial. The effects of differentially reinforcing restricted-choice selections were evaluated using a reversal design. For 4 participants, the effects of providing a running tally of points won by arrangement and verbal rules regarding the schedule of reinforcement were also evaluated using a nonconcurrent multiple-baseline-across-participants design. Results varied across participants but generally demonstrated that (a) preference for choice corresponded more closely to verbal reports of the odds of winning than to reinforcement schedules, (b) rules and feedback were correlated with more accurate verbal reports, and (c) preference for choice corresponded more highly to the relative number of reinforcements obtained across free- and restricted-choice arrangements in a session than to the obtained probability of reinforcement or to verbal reports of the odds of winning.

  18. Treatment outcomes of HIV-positive patients on first-line antiretroviral therapy in private versus public HIV clinics in Johannesburg, South Africa.

    PubMed

    Moyo, Faith; Chasela, Charles; Brennan, Alana T; Ebrahim, Osman; Sanne, Ian M; Long, Lawrence; Evans, Denise

    2016-01-01

    Despite the widely documented success of antiretroviral therapy (ART), stakeholders continue to face the challenges of poor HIV treatment outcomes. While many studies have investigated patient-level causes of poor treatment outcomes, data on the effect of health systems on ART outcomes are scarce. We compare treatment outcomes among patients receiving HIV care and treatment at a public and private HIV clinic in Johannesburg, South Africa. This was a retrospective cohort analysis of ART naïve adults (≥18.0 years), initiating ART at a public or private clinic in Johannesburg between July 01, 2007 and December 31, 2012. Cox proportional-hazards regression was used to identify baseline predictors of mortality and loss to follow-up (>3 months late for the last scheduled visit). Generalized estimating equations were used to determine predictors of failure to suppress viral load (≥400 copies/mL) while the Wilcoxon rank-sum test was used to compare the median absolute change in CD4 count from baseline to 12 months post-ART initiation. 12,865 patients initiated ART at the public clinic compared to 610 at the private clinic. The patients were similar in terms of sex and age at initiation. Compared to public clinic patients, private clinic patients initiated ART at higher median CD4 counts (159 vs 113 cells/mm(3)) and World Health Organization stage I/II (76.1% vs 58.5%). Adjusted hazard models showed that compared to public clinic patients, private clinic patients were less likely to die (adjusted hazard ratio [aHR] 0.50; 95% confidence interval [CI] 0.35-0.70) but were at increased risk of loss to follow-up (aHR 1.80; 95% CI 1.59-2.03). By 12 months post-ART initiation, private clinic patients were less likely to have a detectable viral load (adjusted relative risk 0.65; 95% CI 0.49-0.88) and recorded higher median CD4 change from baseline (184 cells/mm(3) interquartile range 101-300 vs 158 cells/mm(3) interquartile range 91-244), when compared to public clinic patients. We identified differences in treatment outcomes between the two HIV clinics. Findings suggest that the type of clinic at which ART patients initiate and receive treatment can have an impact on treatment outcomes. Further research is necessary to provide more conclusive results.

  19. Value of its information for congestion avoidance in inter-modal transportation systems.

    DOT National Transportation Integrated Search

    2012-01-01

    This paper considers a freight forwarder's problem of selecting air cargo ight itineraries to a given set of heterogeneous customers and, simultaneously, planning the pickup and airport delivery schedule of customer loads. The air cargo ight itinerar...

  20. 76 FR 18548 - Clean Water Act Section 303(d): Final Agency Action on Three Total Maximum Daily Loads (TMDLs) in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-04

    ... Smith at the address below. Please contact Ms. Smith to schedule an inspection. FOR FURTHER INFORMATION CONTACT: Diane Smith, Environmental Protection Specialist, Water Quality Protection Division, U.S. EPA...

  1. Effects of strategic versus tactical instructions on adaptation to changing contingencies in children with adhd.

    PubMed

    Bicard, David E; Neef, Nancy A

    2002-01-01

    This study examined the effects of two types of instructions on the academic responding of 4 children with attention deficit hyperactivity disorder. Tactical instructions specified how to distribute responding between two concurrently available sets of math problems associated with different variable-interval schedules of reinforcement. Strategic instructions provided a strategy to determine the best way to distribute responding. Instruction conditions were counterbalanced in an ABAB/BABA reversal design nested within a multiple baseline across participants design. Experimental sessions consisted of a learning session in which participants were provided with one type of instruction, followed by a test session in which no instruction was provided. The schedules of reinforcement were subsequently reversed during test sessions. When learning and test schedules were identical, the responding of all 4 participants closely matched the reinforcement schedules. When tactical instructions were provided and schedules were subsequently changed, responding often remained under the control of the instructions. When strategic instructions were provided, responding more quickly adapted to the changed contingencies. Analysis of postsession verbal reports indicated correspondence between the participants' verbal descriptions (whether accurate or inaccurate) and their nonverbal patterns of responding.

  2. Improving patient access to an interventional US clinic.

    PubMed

    Steele, Joseph R; Clarke, Ryan K; Terrell, John A; Brightmon, Tonya R

    2014-01-01

    A continuous quality improvement project was conducted to increase patient access to a neurointerventional ultrasonography (US) clinic. The clinic was experiencing major scheduling delays because of an increasing patient volume. A multidisciplinary team was formed that included schedulers, medical assistants, nurses, technologists, and physicians. The team created an Ishikawa diagram of the possible causes of the long wait time to the next available appointment and developed a flowchart of the steps involved in scheduling and completing a diagnostic US examination and biopsy. The team then implemented a staged intervention that included adjustments to staffing and room use (stage 1); new procedures for scheduling same-day add-on appointments (stage 2); and a lead technician rotation to optimize patient flow, staffing, and workflow (stage 3). Six months after initiation of the intervention, the mean time to the next available appointment had decreased from 25 days at baseline to 1 day, and the number of available daily appointments had increased from 38 to 55. These improvements resulted from a coordinated provider effort and had a net present value of more than $275,000. This project demonstrates that structural changes in staffing, workflow, and room use can substantially reduce scheduling delays for critical imaging procedures. © RSNA, 2014.

  3. Characterization of secondary ignition sources in unattended compartments and full-scale baseline test. [aircraft safety

    NASA Technical Reports Server (NTRS)

    Klink, D. M.

    1977-01-01

    The characteristics of five fuel loads burned within a metal lavatory were identified. In 15 of the tests the lavatory door remained closed for the 30-minute test period while in 15 additional tests the door was opened after the fire had developed. Upon completion of these tests the most severe source was selected for use in the baseline test. In the baseline test, the lavatory and adjacent panels, all of which were constructed of contemporary materials, were tested for a period of 1 hour. Thermal, environmental, and biological data were obtained for all fuel loads, door conditions, and the baseline test. All tests were conducted in a cabin fire simulator with separate ventilation of the cabin and lavatory representative of an inflight condition. The baseline test established that by using the most severe fuel source: (1) the exposed animal subject survived without complications; (2) no toxic levels of gas within the cabin were detected; (3) a propagating fire did not develop in adjacent structures; (4) the lavatory containing the fire remained structurally intact; (5) decomposition of portions of the lavatory did occur; and (6) cabin visibility would have presented a problem after 5 minutes.

  4. Sliding Contact Bearings for Service to 700 C

    NASA Technical Reports Server (NTRS)

    Sliney, Harold E.

    1996-01-01

    Cylindrical, sliding contact bearings made entirely of a self-lubricating powder metallurgy composite (PM212) or of super alloy shells lined with clad PM212 were tested in an oscillating mode at temperatures from 25 to 700 C. Tests of 100 hr duration or longer were conducted at a bearing unit load of 3.45 Mpa (500 psi). Shorter duration tests at various unit loads up to 24.1 Mpa (3500 psi) were also conducted. In comparison tests, bearings lubricated with PM212 had superior anti-wear characteristics compared to the baseline, unlubricated, super alloy bearings: no galling of PM212-lubricated bearings occurred, while severe surface damage including galling occurred, especially at high loads, during the baseline tests. A heat treatment procedure, which dimensionally stabilizes PM212 and thereby minimizes clearance changes during high temperature bearing operation, is described.

  5. Usage monitoring of electrical devices in a smart home.

    PubMed

    Rahimi, Saba; Chan, Adrian D C; Goubran, Rafik A

    2011-01-01

    Profiling the usage of electrical devices within a smart home can be used as a method for determining an occupant's activities of daily living. A nonintrusive load monitoring system monitors the electrical consumption at a single electrical source (e.g., main electric utility service entry) and the operating schedules of individual devices are determined by disaggregating the composite electrical consumption waveforms. An electrical device's load signature plays a key role in nonintrusive load monitoring systems. A load signature is the unique electrical behaviour of an individual device when it is in operation. This paper proposes a feature-based model, using the real power and reactive power as features for describing the load signatures of individual devices. Experimental results for single device recognition for 7 devices show that the proposed approach can achieve 100% classification accuracy with discriminant analysis using Mahalanobis distances.

  6. Comparing the Performance of Two Dynamic Load Distribution Methods

    NASA Technical Reports Server (NTRS)

    Kale, L. V.

    1987-01-01

    Parallel processing of symbolic computations on a message-passing multi-processor presents one challenge: To effectively utilize the available processors, the load must be distributed uniformly to all the processors. However, the structure of these computations cannot be predicted in advance. go, static scheduling methods are not applicable. In this paper, we compare the performance of two dynamic, distributed load balancing methods with extensive simulation studies. The two schemes are: the Contracting Within a Neighborhood (CWN) scheme proposed by us, and the Gradient Model proposed by Lin and Keller. We conclude that although simpler, the CWN is significantly more effective at distributing the work than the Gradient model.

  7. Spacecraft load, design and test philosophies

    NASA Technical Reports Server (NTRS)

    Wada, B. K.

    1986-01-01

    The development of spacecraft loads, design and test philosophies at the Jet Propulsion Laboratory (JPL) during the past 25 years is presented. Examples from the JPL's Viking, Voyager and Galileo spacecraft are used to explain the changes in philosophy necessary to meet the program requirements with a reduction in cost and schedule. Approaches to validate mathematical models of large structures which can't be ground tested as an overall system because of size and/or adverse effects of terrestrial conditions such as gravity are presented.

  8. Multi-stage rescheduling of generation, load shedding and short-term transmission capacity for emergency state control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krogh, B.; Chow, J.H.; Javid, H.S.

    1983-05-01

    A multi-stage formulation of the problem of scheduling generation, load shedding and short term transmission capacity for the alleviation of a viability emergency is presented. The formulation includes generation rate of change constraints, a linear network solution, and a model of the short term thermal overload capacity of transmission lines. The concept of rotating transmission line overloads for emergency state control is developed. The ideas are illustrated by a numerical example.

  9. Heimdall System for MSSS Sensor Tasking

    NASA Astrophysics Data System (ADS)

    Herz, A.; Jones, B.; Herz, E.; George, D.; Axelrad, P.; Gehly, S.

    In Norse Mythology, Heimdall uses his foreknowledge and keen eyesight to keep watch for disaster from his home near the Rainbow Bridge. Orbit Logic and the Colorado Center for Astrodynamics Research (CCAR) at the University of Colorado (CU) have developed the Heimdall System to schedule observations of known and uncharacterized objects and search for new objects from the Maui Space Surveillance Site. Heimdall addresses the current need for automated and optimized SSA sensor tasking driven by factors associated with improved space object catalog maintenance. Orbit Logic and CU developed an initial baseline prototype SSA sensor tasking capability for select sensors at the Maui Space Surveillance Site (MSSS) using STK and STK Scheduler, and then added a new Track Prioritization Component for FiSST-inspired computations for predicted Information Gain and Probability of Detection, and a new SSA-specific Figure-of-Merit (FOM) for optimized SSA sensor tasking. While the baseline prototype addresses automation and some of the multi-sensor tasking optimization, the SSA-improved prototype addresses all of the key elements required for improved tasking leading to enhanced object catalog maintenance. The Heimdall proof-of-concept was demonstrated for MSSS SSA sensor tasking for a 24 hour period to attempt observations of all operational satellites in the unclassified NORAD catalog, observe a small set of high priority GEO targets every 30 minutes, make a sky survey of the GEO belt region accessible to MSSS sensors, and observe particular GEO regions that have a high probability of finding new objects with any excess sensor time. This Heimdall prototype software paves the way for further R&D that will integrate this technology into the MSSS systems for operational scheduling, improve the software's scalability, and further tune and enhance schedule optimization. The Heimdall software for SSA sensor tasking provides greatly improved performance over manual tasking, improved coordinated sensor usage, and tasking schedules driven by catalog improvement goals (reduced overall covariance, etc.). The improved performance also enables more responsive sensor tasking to address external events, newly detected objects, newly detected object activity, and sensor anomalies. Instead of having to wait until the next day's scheduling phase, events can be addressed with new tasking schedules immediately (within seconds or minutes). Perhaps the most important benefit is improved SSA based on an overall improvement to the quality of the space catalog. By driving sensor tasking and scheduling based on predicted Information Gain and other relevant factors, better decisions are made in the application of available sensor resources, leading to an improved catalog and better information about the objects of most interest. The Heimdall software solution provides a configurable, automated system to improve sensor tasking efficiency and responsiveness for SSA applications. The FISST algorithms for Track Prioritization, SSA specific task and resource attributes, Scheduler algorithms, and configurable SSA-specific Figure-of-Merit together provide optimized and tunable scheduling for the Maui Space Surveillance Site and possibly other sites and organizations across the U.S. military and for allies around the world.

  10. 75 FR 25127 - Operations Specifications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... information on those who are to respond, including by using appropriate automated, electronic, mechanical, or... total quantity of hydraulic fluid. Flag operation means any scheduled operation conducted by any person... aircraft equipment, and less the operating load (consisting of minimum flightcrew, foods and beverages, and...

  11. WATERSHED CLASSIFICATION AS A DIAGNOSTIC TOOL FOR CONSOLIDATED ASSESSMENT AND LISTING PROGRAMS

    EPA Science Inventory

    With over 40,000 TMDLs scheduled for development, the states, tribes, and EPA Regions need efficient streamlined approaches for watershed level inventory, monitoring, condition assessment, diagnosis of impairment, and prioritization of watersheds for restoration and future load r...

  12. 40 CFR 403.7 - Removal credits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... representative of the actual operation of the POTW Treatment Plant, an alternative sampling schedule will be... statistically valid description of daily, weekly and seasonal sewage treatment plant loadings and performance... the intentional or unintentional diversion of flow from the POTW before the POTW Treatment Plant...

  13. Temporal variability of pharmaceuticals and illicit drugs in wastewater and the effects of a major sporting event.

    PubMed

    Gerrity, Daniel; Trenholm, Rebecca A; Snyder, Shane A

    2011-11-01

    Diurnal variations in wastewater flows are common phenomena related to peak water use periods. However, few studies have examined high-resolution temporal variability in trace organic contaminant (TOrC) concentrations and loadings. Even fewer have assessed the impacts of a special event or holiday. This study characterizes the temporal variability associated with a major sporting event using flow data and corresponding mass loadings of a suite of prescription pharmaceuticals, potential endocrine disrupting compounds (EDCs), and illicit drugs. Wastewater influent and finished effluent samples were collected during the National Football League's Super Bowl, which is a significant weekend for tourism in the study area. Data from a baseline weekend is also provided to illustrate flows and TOrC loadings during "normal" operational conditions. Some compounds exhibited interesting temporal variations (e.g., atenolol), and several compounds demonstrated different loading profiles during the Super Bowl and baseline weekends (e.g., the primary cocaine metabolite benzoylecgonine). Interestingly, the influent mass loadings of prescription pharmaceuticals were generally similar in magnitude to those of the illicit drugs and their metabolites. However, conventional wastewater treatment was more effective in removing the illicit drugs and their metabolites. Total influent and effluent mass loadings are also provided to summarize treatment efficacy and environmental discharges. Copyright © 2011 Elsevier Ltd. All rights reserved.

  14. Final Report. Baseline LAW Glass Formulation Testing, VSL-03R3460-1, Rev. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muller, Isabelle S.; Pegg, Ian L.; Gan, Hao

    2015-06-18

    The major objective of the baseline glass formulation work was to develop and select glass formulations that are compliant with contractual and processing requirements for each of the LAW waste streams. Other objectives of the work included preparation and characterization of glasses with respect to the properties of interest, optimization of sulfate loading in the glasses, evaluation of ability to achieve waste loading limits, testing to demonstrate compatibility of glass melts with melter materials of construction, development of glass formulations to support ILAW qualification activities, and identification of glass formulation issues with respect to contract specifications and processing requirements.

  15. Are preference and resistance to change convergent expressions of stimulus value?

    PubMed

    Podlesnik, Christopher A; Jimenez-Gomez, Corina; Shahan, Timothy A

    2013-07-01

    Behavioral momentum theory asserts that preference and relative resistance to disruption depend on reinforcement rates and provide converging expressions of the conditioned value of discriminative stimuli. However, preference and resistance to disruption diverge when assessing preference during brief extinction probes. We expanded upon this opposing relation by arranging target stimuli signaling equal variable-interval schedules across components of a multiple schedule. We paired one target stimulus with a richer reinforced alternative and the other with a leaner alternative. Furthermore, we varied reinforcement rates for the paired alternatives to assess the effects of manipulating relative conditioned value on preference and resistance to disruption by presession feeding, intercomponent food, and extinction. We replicated the opposing relation between preference and resistance to disruption but varying reinforcement rates for the paired alternatives did not systematically affect preference or resistance to disruption beyond levels observed in our initial condition. Importantly, we found that only preference between the target stimuli was related to relative baseline response rates in the presence of those stimuli. These findings suggest that preference during extinction probes might reveal more about baseline response rates between concurrently available alternatives than relative conditioned value. Resistance to disruption, conversely, appears to better reflect conditioned value because it is less confounded with baseline response rates and is a function of all sources of reinforcement obtained in the presence of a stimulus context. © Society for the Experimental Analysis of Behavior.

  16. A New Baseline for Chronic Fatigue: Why Measuring Flight Time Is the Wrong Approach

    DTIC Science & Technology

    2013-04-01

    crew is shown to report fully or nearly fully effective for the following sortie despite their harrowing schedule. (Table 3) Flyawake Results...Journal of Psychology, July 1948: 13. Svan, Jennifer H. "Air Force Changes Deployments Lengths for Some 42,000 Airmen." Stars and Stripes, September 16

  17. Nuclear Weapons: NNSA Needs to Establish a Cost and Schedule Baseline for Manufacturing a Critical Nuclear Weapon Component

    DTIC Science & Technology

    2008-05-01

    building up to and beyond the 2013 time frame. However, in October 2007, the Defense Nuclear Facilities Safety Board, which monitors safety...manufacturing. They said that NNSA is still working through this process with the Defense Nuclear Facilities Safety Board. Processing of waste

  18. Enhanced Case Management versus Substance Abuse Treatment Alone among Substance Abusers with Depression

    ERIC Educational Resources Information Center

    Striley, Catherine W.; Nattala, Prasanthi; Ben Abdallah, Arbi; Dennis, Michael L.; Cottler, Linda B.

    2013-01-01

    This pilot study evaluated the effectiveness of enhanced case management for substance abusers with comorbid major depression, which was an integrated approach to care. One hundred and 20 participants admitted to drug treatment who also met Computerized Diagnostic Interview Schedule criteria for major depression at baseline were randomized to…

  19. Joint Light Tactical Vehicle (JLTV)

    DTIC Science & Technology

    2013-12-01

    BY - Base Year DAMIR - Defense Acquisition Management Information Retrieval Dev Est - Development Estimate DoD - Department of Defense DSN - Defense...Production Estimate QR - Quantity Related Qty - Quantity RDT&E - Research, Development , Test, and Evaluation SAR - Selected Acquisition Report Sch - Schedule... Development Estimate) Defense Acquisition Executive (DAE) Approved Acquisition Program Baseline (APB) dated October 23, 2012 Approved APB Defense

  20. 75 FR 29527 - Combined Notice Of Filings # 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ... Sales Tariff to be effective 5/14/2010. Filed Date: 05/14/2010. Accession Number: 20100514-5039. Comment...: Baseline filing of Consolidated Edison Energy, Inc. MBR to be effective 5/14/2010. Filed Date: 05/14/2010.... Description: ISO New England Inc. submits its Capital Projects Report and schedule of the unamortized costs of...

  1. Measuring Resistance to Change at the Within-Session Level

    ERIC Educational Resources Information Center

    Tonneau, Francois; Rios, Americo; Cabrera, Felipe

    2006-01-01

    Resistance to change is often studied by measuring response rate in various components of a multiple schedule. Response rate in each component is normalized (that is, divided by its baseline level) and then log-transformed. Differential resistance to change is demonstrated if the normalized, log-transformed response rate in one component decreases…

  2. Naps promote flexible memory retrieval in 12-month-old infants.

    PubMed

    Konrad, Carolin; Seehagen, Sabine; Schneider, Silvia; Herbert, Jane S

    2016-11-01

    Flexibility in applying existing knowledge to similar cues is a corner stone of memory development in infants. Here, we examine the effect of sleep on the flexibility of memory retrieval using a deferred imitation paradigm. Forty-eight 12-month-old infants were randomly assigned to either a nap or a no-nap demonstration condition (scheduled around their natural daytime sleep schedule) or to a baseline control condition. In the demonstration conditions, infants watched an experimenter perform three target actions on a hand puppet. Immediately afterwards, infants were allowed to practice the target actions three times. In a test session 4-hr later, infants were given the opportunity to reproduce the actions with a novel hand puppet differing in color from the puppet used during the demonstration session. Only infants in the nap-condition performed significantly more target actions than infants in the baseline control condition. Furthermore, they were faster to carry out the first target action than infants in the no-nap condition. We conclude that sleep had a facilitative effect on infants' flexibility of memory retrieval. © 2016 Wiley Periodicals, Inc.

  3. Metroplex Optimization Model Expansion and Analysis: The Airline Fleet, Route, and Schedule Optimization Model (AFRS-OM)

    NASA Technical Reports Server (NTRS)

    Sherry, Lance; Ferguson, John; Hoffman, Karla; Donohue, George; Beradino, Frank

    2012-01-01

    This report describes the Airline Fleet, Route, and Schedule Optimization Model (AFRS-OM) that is designed to provide insights into airline decision-making with regards to markets served, schedule of flights on these markets, the type of aircraft assigned to each scheduled flight, load factors, airfares, and airline profits. The main inputs to the model are hedged fuel prices, airport capacity limits, and candidate markets. Embedded in the model are aircraft performance and associated cost factors, and willingness-to-pay (i.e. demand vs. airfare curves). Case studies demonstrate the application of the model for analysis of the effects of increased capacity and changes in operating costs (e.g. fuel prices). Although there are differences between airports (due to differences in the magnitude of travel demand and sensitivity to airfare), the system is more sensitive to changes in fuel prices than capacity. Further, the benefits of modernization in the form of increased capacity could be undermined by increases in hedged fuel prices

  4. Short-Term Load Forecasting Based Automatic Distribution Network Reconfiguration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jiang, Huaiguang; Ding, Fei; Zhang, Yingchen

    In a traditional dynamic network reconfiguration study, the optimal topology is determined at every scheduled time point by using the real load data measured at that time. The development of the load forecasting technique can provide an accurate prediction of the load power that will happen in a future time and provide more information about load changes. With the inclusion of load forecasting, the optimal topology can be determined based on the predicted load conditions during a longer time period instead of using a snapshot of the load at the time when the reconfiguration happens; thus, the distribution system operatormore » can use this information to better operate the system reconfiguration and achieve optimal solutions. This paper proposes a short-term load forecasting approach to automatically reconfigure distribution systems in a dynamic and pre-event manner. Specifically, a short-term and high-resolution distribution system load forecasting approach is proposed with a forecaster based on support vector regression and parallel parameters optimization. The network reconfiguration problem is solved by using the forecasted load continuously to determine the optimal network topology with the minimum amount of loss at the future time. The simulation results validate and evaluate the proposed approach.« less

  5. Short-Term Load Forecasting Based Automatic Distribution Network Reconfiguration: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jiang, Huaiguang; Ding, Fei; Zhang, Yingchen

    In the traditional dynamic network reconfiguration study, the optimal topology is determined at every scheduled time point by using the real load data measured at that time. The development of load forecasting technique can provide accurate prediction of load power that will happen in future time and provide more information about load changes. With the inclusion of load forecasting, the optimal topology can be determined based on the predicted load conditions during the longer time period instead of using the snapshot of load at the time when the reconfiguration happens, and thus it can provide information to the distribution systemmore » operator (DSO) to better operate the system reconfiguration to achieve optimal solutions. Thus, this paper proposes a short-term load forecasting based approach for automatically reconfiguring distribution systems in a dynamic and pre-event manner. Specifically, a short-term and high-resolution distribution system load forecasting approach is proposed with support vector regression (SVR) based forecaster and parallel parameters optimization. And the network reconfiguration problem is solved by using the forecasted load continuously to determine the optimal network topology with the minimum loss at the future time. The simulation results validate and evaluate the proposed approach.« less

  6. Short-Term Load Forecasting-Based Automatic Distribution Network Reconfiguration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jiang, Huaiguang; Ding, Fei; Zhang, Yingchen

    In a traditional dynamic network reconfiguration study, the optimal topology is determined at every scheduled time point by using the real load data measured at that time. The development of the load forecasting technique can provide an accurate prediction of the load power that will happen in a future time and provide more information about load changes. With the inclusion of load forecasting, the optimal topology can be determined based on the predicted load conditions during a longer time period instead of using a snapshot of the load at the time when the reconfiguration happens; thus, the distribution system operatormore » can use this information to better operate the system reconfiguration and achieve optimal solutions. This paper proposes a short-term load forecasting approach to automatically reconfigure distribution systems in a dynamic and pre-event manner. Specifically, a short-term and high-resolution distribution system load forecasting approach is proposed with a forecaster based on support vector regression and parallel parameters optimization. The network reconfiguration problem is solved by using the forecasted load continuously to determine the optimal network topology with the minimum amount of loss at the future time. The simulation results validate and evaluate the proposed approach.« less

  7. Chloride Content of Fluids Used for Large-Volume Resuscitation Is Associated With Reduced Survival.

    PubMed

    Sen, Ayan; Keener, Christopher M; Sileanu, Florentina E; Foldes, Emily; Clermont, Gilles; Murugan, Raghavan; Kellum, John A

    2017-02-01

    We sought to investigate if the chloride content of fluids used in resuscitation was associated with short- and long-term outcomes. We identified patients who received large-volume fluid resuscitation, defined as greater than 60 mL/kg over a 24-hour period. Chloride load was determined for each patient based on the chloride ion concentration of the fluids they received during large-volume fluid resuscitation multiplied by the volume of fluids. We compared the development of hyperchloremic acidosis, acute kidney injury, and survival among those with higher and lower chloride loads. University Medical Center. Patients admitted to ICUs from 2000 to 2008. None. Among 4,710 patients receiving large-volume fluid resuscitation, hyperchloremic acidosis was documented in 523 (11%). Crude rates of hyperchloremic acidosis, acute kidney injury, and hospital mortality all increased significantly as chloride load increased (p < 0.001). However, chloride load was no longer associated with hyperchloremic acidosis or acute kidney injury after controlling for total fluids, age, and baseline severity. Conversely, each 100 mEq increase in chloride load was associated with a 5.5% increase in the hazard of death even after controlling for total fluid volume, age, and severity (p = 0.0015) over 1 year. Chloride load is associated with significant adverse effects on survival out to 1 year even after controlling for total fluid load, age, and baseline severity of illness. However, the relationship between chloride load and development of hyperchloremic acidosis or acute kidney injury is less clear, and further research is needed to elucidate the mechanisms underlying the adverse effects of chloride load on survival.

  8. Signals, resistance to change, and conditioned reinforcement in a multiple schedule.

    PubMed

    Bell, Matthew C; Gomez, Belen E; Kessler, Kira

    2008-06-01

    The effect of signals on resistance to change was evaluated using pigeons responding on a three-component multiple schedule. Each component contained a variable-interval initial link followed by a fixed-time terminal link. One component was an unsignaled-delay schedule, and two were equivalent signaled-delay schedules. After baseline training, resistance to change was assessed through (a) extinction and (b) adding free food to the intercomponent interval. During these tests, the signal stimulus from one of the signaled-delay components (SIG-T) was replaced with the initial-link stimulus from that component, converting it to an unsignaled-delay schedule. That signal stimulus was added to the delay period of the unsignaled-delay component (UNS), converting it to a signaled-delay schedule. The remaining signaled component remained unchanged (SIG-C). Resistance-to-change tests showed removing the signal had a minimal effect on resistance to change in the SIG-T component compared to the unchanged SIG-C component except for one block during free-food testing. Adding the signal to the UNS component significantly increased response rates suggesting that component had low response strength. Interestingly, the direction of the effect was in the opposite direction from what is typically observed. Results are consistent with the conclusion that the signal functioned as a conditioned reinforcer and inconsistent with a generalization-decrement explanation.

  9. Are positive and negative reinforcement "different"? Insights from a free-operant differential outcomes effect.

    PubMed

    Magoon, Michael A; Critchfield, Thomas S; Merrill, Dustin; Newland, M Christopher; Schneider, W Joel

    2017-01-01

    Although theoretical discussions typically assume that positive and negative reinforcement differ, the literature contains little unambiguous evidence that they produce differential behavioral effects. To test whether the two types of consequences control behavior differently, we pitted money-gain positive reinforcement and money-loss-avoidance negative reinforcement, scheduled through identically programmed variable-cycle schedules, against each other in concurrent schedules. Contingencies of response-produced feedback, normally different in positive and negative reinforcement, were made symmetrical. Steeper matching slopes were produced compared to a baseline consisting of all positive reinforcement. This free-operant differential outcomes effect supports the notion that that stimulus-presentation positive reinforcement and stimulus-elimination negative reinforcement are functionally "different." However, a control experiment showed that the feedback asymmetry of more traditional positive and negative reinforcement schedules also is sufficient to create a "difference" when the type of consequence is held constant. We offer these findings as a small step in meeting the very large challenge of moving negative reinforcement theory beyond decades of relative quiescence. © 2017 Society for the Experimental Analysis of Behavior.

  10. Supervision strategies for improved reliability of bus routes. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-01

    The synthesis will be of interest to transit agency managers and supervisors, as well as to operating and planning personnel who are concerned with the reliability and scheduling of buses. Information is provided on service monitoring, service supervision and control, and supervision strategies. Reliability of transit service is critical to bus transit ridership. The extent of service supervision has an important bearing on reliability. The report describes the various procedures that are used by transit agencies to monitor and maintain bus service reliability. Most transit systems conduct checks of the number of riders at maximum load points and monitor schedulemore » adherence at these locations. Other supervisory actions include service restoration techniques, and strategies such as schedule control, headway control, load control, extraboard management, and personnel selection and training. More sophisticated technologies, such as automatic passenger counting (APC) systems and automatic vehicle location and control (AVLC), have been employed by some transit agencies and are described in the synthesis.« less

  11. Smart grid integration of small-scale trigeneration systems

    NASA Astrophysics Data System (ADS)

    Vacheva, Gergana; Kanchev, Hristiyan; Hinov, Nikolay

    2017-12-01

    This paper presents a study on the possibilities for implementation of local heating, air-conditioning and electricity generation (trigeneration) as distributed energy resource in the Smart Grid. By the means of microturbine-based generators and absorption chillers buildings are able to meet partially or entirely their electrical load curve or even supply power to the grid by following their heating and air-conditioning daily schedule. The principles of small-scale cooling, heating and power generation systems are presented at first, then the thermal calculations of an example building are performed: the heat losses due to thermal conductivity and the estimated daily heating and air-conditioning load curves. By considering daily power consumption curves and weather data for several winter and summer days, the heating/air-conditioning schedule is estimated and the available electrical energy from a microturbine-based cogeneration system is estimated. Simulation results confirm the potential of using cogeneration and trigeneration systems for local distributed electricity generation and grid support in the daily peaks of power consumption.

  12. Evaluation of graphite composite materials for bearingless helicopter rotor application

    NASA Technical Reports Server (NTRS)

    Ulitchny, M. G.; Lucas, J. J.

    1974-01-01

    Small scale combined load fatigue tests were conducted on twelve unidirectional graphite-glass scrim-epoxy composite specimens. The specimens were 1 in. (2.54 cm) wide by 0.1 in. (.25 cm) thick by 5 in. (12.70 cm) long. The fatigue data was developed for the preliminary design of the spar for a bearingless helicopter main rotor. Three loading conditions were tested. Combinations of steady axial, vibratory torsion, and vibratory bending stresses were chosen to simulate the calculated stresses which exist at the root and at the outboard end of the pitch change section of the spar. Calculated loads for 150 knots (77.1 m/sec) level flight were chosen as the baseline condition. Test stresses were varied up to 4.4 times the baseline stress levels. Damage resulted in reduced stiffness; however, in no case was complete fracture of the specimen experienced.

  13. Reliability-based optimization of maintenance scheduling of mechanical components under fatigue

    PubMed Central

    Beaurepaire, P.; Valdebenito, M.A.; Schuëller, G.I.; Jensen, H.A.

    2012-01-01

    This study presents the optimization of the maintenance scheduling of mechanical components under fatigue loading. The cracks of damaged structures may be detected during non-destructive inspection and subsequently repaired. Fatigue crack initiation and growth show inherent variability, and as well the outcome of inspection activities. The problem is addressed under the framework of reliability based optimization. The initiation and propagation of fatigue cracks are efficiently modeled using cohesive zone elements. The applicability of the method is demonstrated by a numerical example, which involves a plate with two holes subject to alternating stress. PMID:23564979

  14. Design implementation of lean supply chain management: A case study on loading process of fertilizer at PT Petrokimia Gresik port

    NASA Astrophysics Data System (ADS)

    Wibowo, Agus Tri; Handayani, Naniek Utami

    2017-11-01

    Petrokimia Gresik is one of the largest fertilizer producer in Indonesia which has a cross-country network of supply chain and distribution throughout the archipelago, either in bulk fertilizer or in bag fertilizer. This research was conducted at PT. PG port which is the main point of the logistics activities in the firm itself, either loading or unloading. This research focus on the process of loading the in bag fertilizer. Problems that occur in this process are due to the inefficiency of the flow of the Supply Chain, caused by the presence of waste and non-value-added activities. The purpose of this study was to determine what kind of waste that occurs during the process, as well as suggestions for improvements using the concept of Lean Supply Chain and Value Stream Mapping, and look for the cause of the problem using the 5 Whys method. The most influential types of waste during the process stream is Waiting Time (20.42%), and Non-Value Added activies of 51.9%. By using 5Whys, the largest cause of waste found are the length of the truck waiting for the cargo, numbers of crane are already inproper, and the absence of the scheduling and charge allocation. Recommended solutions are scheduling and allocation, creation of special line in the warehouse, and supplying cranes with appropriate load speed. Based on improvement suggestions, total NVA predicted to be reduced to 59.8%.

  15. Wind Turbine Control Design to Reduce Capital Costs: 7 January 2009 - 31 August 2009

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Darrow, P. J.

    2010-01-01

    This report first discusses and identifies which wind turbine components can benefit from advanced control algorithms and also presents results from a preliminary loads case analysis using a baseline controller. Next, it describes the design, implementation, and simulation-based testing of an advanced controller to reduce loads on those components. The case-by-case loads analysis and advanced controller design will help guide future control research.

  16. Administration of tauroursodeoxycholic acid prevents endothelial dysfunction caused by an oral glucose load

    PubMed Central

    Walsh, Lauren K.; Restaino, Robert M.; Neuringer, Martha; Manrique, Camila; Padilla, Jaume

    2017-01-01

    Postprandial hyperglycemia leads to a transient impairment in endothelial function; however, the mechanisms remain largely unknown. Previous work in cell culture models demonstrate that high glucose results in endoplasmic reticulum (ER) stress and, in animal studies, ER stress has been implicated as a cause of endothelial dysfunction. Herein we tested the hypothesis that acute oral administration of tauroursodeoxycholic acid (TUDCA, 1500mg), a chemical chaperone known to alleviate ER stress, would prevent hyperglycemia-induced endothelial dysfunction. In 12 young healthy subjects (seven men, five women), brachial artery flow-mediated dilation (FMD) was assessed at baseline, 1 hour, and 2 hours post an oral glucose challenge. Subjects were tested on two separate visits in a single-blind randomized crossover design: after oral ingestion of TUDCA or placebo capsules. FMD was reduced from baseline during hyperglycemia under the placebo condition (−32% at 1 hr and −28% at 2 hr post oral glucose load; p<0.05 from baseline) but not under the TUDCA condition (−4% at 1 hr and +0.3% at 2 hr post oral glucose load; p>0.05 from baseline). Postprandial plasma glucose and insulin were not altered by TUDCA ingestion. Plasma oxidative stress markers 3-nitrotyrosine and TBARs remained unaltered throughout the oral glucose challenge in both conditions. These results suggest that hyperglycemia-induced endothelial dysfunction can be mitigated by oral administration of TUDCA, thus supporting the hypothesis that ER stress may contribute to endothelial dysfunction during postprandial hyperglycemia. PMID:27503949

  17. Effects of vest loading on sprint kinetics and kinematics.

    PubMed

    Cross, Matt R; Brughelli, Matt E; Cronin, John B

    2014-07-01

    The effects of vest loading on sprint kinetics and kinematics during the acceleration and maximum velocity phases of sprinting are relatively unknown. A repeated measures analysis of variance with post hoc contrasts was used to determine whether performing 6-second maximal exertion sprints on a nonmotorized force treadmill, under 2 weighted vest loading conditions (9 and 18 kg) and an unloaded baseline condition, affected the sprint mechanics of 13 males from varying sporting backgrounds. Neither vest load promoted significant change in peak vertical ground reaction force (GRF-z) outputs compared with baseline during acceleration, and only 18-kg loading increased GRF-z at the maximum velocity (8.8%; effect size [ES] = 0.70). The mean GRF-z significantly increased with 18-kg loading during acceleration and maximum velocity (11.8-12.4%; ES = 1.17-1.33). Horizontal force output was unaffected, although horizontal power was decreased with the 18-kg vest during maximum velocity (-14.3%; ES = -0.48). Kinematic analysis revealed decreasing velocity (-3.6 to -5.6%; ES = -0.38 to -0.61), decreasing step length (-4.2%; ES = -0.33 to -0.34), increasing contact time (5.9-10.0%; ES = 1.01-1.71), and decreasing flight time (-17.4 to -26.7%; ES = -0.89 to -1.50) with increased loading. As a vertical vector-training stimulus, it seems that vest loading decreases flight time, which in turn reduces GRF-z. Furthermore, it seems that heavier loads than that are traditionally recommended are needed to promote increases in the GRF-z output during maximum velocity sprinting. Finally, vest loading offers little as a horizontal vector-training stimulus and actually compromises horizontal power output.

  18. A Hybrid Demand Response Simulator Version 1.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2012-05-02

    A hybrid demand response simulator is developed to test different control algorithms for centralized and distributed demand response (DR) programs in a small distribution power grid. The HDRS is designed to model a wide variety of DR services such as peak having, load shifting, arbitrage, spinning reserves, load following, regulation, emergency load shedding, etc. The HDRS does not model the dynamic behaviors of the loads, rather, it simulates the load scheduling and dispatch process. The load models include TCAs (water heaters, air conditioners, refrigerators, freezers, etc) and non-TCAs (lighting, washer, dishwasher, etc.) The ambient temperature changes, thermal resistance, capacitance, andmore » the unit control logics can be modeled for TCA loads. The use patterns of the non-TCA can be modeled by probability of use and probabilistic durations. Some of the communication network characteristics, such as delays and errors, can also be modeled. Most importantly, because the simulator is modular and greatly simplified the thermal models for TCA loads, it is very easy and fast to be used to test and validate different control algorithms in a simulated environment.« less

  19. Short Term Load Forecasting with Fuzzy Logic Systems for power system planning and reliability-A Review

    NASA Astrophysics Data System (ADS)

    Holmukhe, R. M.; Dhumale, Mrs. Sunita; Chaudhari, Mr. P. S.; Kulkarni, Mr. P. P.

    2010-10-01

    Load forecasting is very essential to the operation of Electricity companies. It enhances the energy efficient and reliable operation of power system. Forecasting of load demand data forms an important component in planning generation schedules in a power system. The purpose of this paper is to identify issues and better method for load foecasting. In this paper we focus on fuzzy logic system based short term load forecasting. It serves as overview of the state of the art in the intelligent techniques employed for load forecasting in power system planning and reliability. Literature review has been conducted and fuzzy logic method has been summarized to highlight advantages and disadvantages of this technique. The proposed technique for implementing fuzzy logic based forecasting is by Identification of the specific day and by using maximum and minimum temperature for that day and finally listing the maximum temperature and peak load for that day. The results show that Load forecasting where there are considerable changes in temperature parameter is better dealt with Fuzzy Logic system method as compared to other short term forecasting techniques.

  20. Simulation of Twin Telescopes at Onsala and Wettzell for the VLBI Global Observing System

    NASA Astrophysics Data System (ADS)

    Schönberger, Caroline; Gnilsen, Paul; Böhm, Johannes; Haas, Rüdiger

    2015-04-01

    The VLBI2010 committee of the International VLBI Service for Geodesy and Astrometry (IVS) developed a concept to achieve an improvement of the accuracy of geodetic Very Long Baseline Interferometry (VLBI) to 1 mm for station positions and 0.1 mm/yr for station velocities. This so-called VLBI2010 concept includes broadband observations with fast slewing telescopes and proposes twin telescopes to improve the handling of atmospheric turbulence that has been identified as a limiting factor for geodetic VLBI. There are several VLBI sites that have projects to install a Twin Telescope. The Wettzell Twin Telescope in Germany has already been constructed, and Twin Telescopes will be installed in the coming years at Onsala (Sweden), Ny-Ålesund (Spitsbergen, Norway) and Kazan (Russia). In this study, the Vienna VLBI Software (VieVS) is used to schedule and simulate a global VLBI network following the example of the CONT11 campaign, with and without the Twin Telescopes in Onsala and Wettzell. Different scheduling approaches (e.g., source-based scheduling, Twin Telescope observing in multidirectional mode, Twin Telescopes in continuous mode) were compared by evaluating the numbers of observations and scans as well as baseline length repeatabilities, station positions, Earth orientation parameters, atmospheric parameters and clock estimates. Comparison of the results show an improvement in estimated parameters with Twin Telescopes, especially with the Onsala Twin Telescope in a continuous observing mode and a strategy with four sources observed simultaneously.

  1. Testing Seam Concepts for Advanced Multilayer Insulation

    NASA Technical Reports Server (NTRS)

    Chato, D. J.; Johnson, W. L.; Alberts, Samantha J.

    2017-01-01

    Multilayer insulation (MLI) is considered the state of the art insulation for cryogenic propellant tanks in the space environment. MLI traditionally consists of multiple layers of metalized films separated by low conductivity spacers. In order to better understand some of the details within MLI design and construction, GRC has been investigating the heat loads caused by multiple types of seams. To date testing has been completed with 20 layer and 50 layer blankets. Although a truly seamless blanket is not practical, a blanket lay-up where each individual layer was overlapped and tapped together was used as a baseline for the other seams tests. Other seams concepts tested included: an overlap where the complete blanket was overlapped on top of itself; a butt joint were the blankets were just trimmed and butted up against each other, and a staggered butt joint where the seam in the out layers is offset from the seam in the inner layers. Measured performance is based on a preliminary analysis of rod calibration tests conducted prior to the start of seams testing. Baseline performance for the 50 layer blanket showed a measured heat load of 0.46 Watts with a degradation to about 0.47 Watts in the seamed blankets. Baseline performance for the 20 layer blanket showed a measured heat load of 0.57 Watts. Heat loads for the seamed tests are still begin analyzed. So far analysis work has suggested the need for corrections due to heat loads from both the heater leads and the instrumentation wires. A careful re-examination of the calibration test results with these factors accounted for is also underway. This presentation will discuss the theory of seams in MLI, our test results to date, and the uncertainties in our measurements.

  2. Mechanically Induced Chromatin Condensation Requires Cellular Contractility in Mesenchymal Stem Cells.

    PubMed

    Heo, Su-Jin; Han, Woojin M; Szczesny, Spencer E; Cosgrove, Brian D; Elliott, Dawn M; Lee, David A; Duncan, Randall L; Mauck, Robert L

    2016-08-23

    Mechanical cues play important roles in directing the lineage commitment of mesenchymal stem cells (MSCs). In this study, we explored the molecular mechanisms by which dynamic tensile loading (DL) regulates chromatin organization in this cell type. Our previous findings indicated that the application of DL elicited a rapid increase in chromatin condensation through purinergic signaling mediated by ATP. Here, we show that the rate and degree of condensation depends on the frequency and duration of mechanical loading, and that ATP release requires actomyosin-based cellular contractility. Increases in baseline cellular contractility via the addition of an activator of G-protein coupled receptors (lysophosphatidic acid) induced rapid ATP release, resulting in chromatin condensation independent of loading. Conversely, inhibition of contractility through pretreatment with either a RhoA/Rock inhibitor (Y27632) or MLCK inhibitor (ML7) abrogated ATP release in response to DL, blocking load-induced chromatin condensation. With loading, ATP release occurred very rapidly (within the first 10-20 s), whereas changes in chromatin occurred at a later time point (∼10 min), suggesting a downstream biochemical pathway mediating this process. When cells were pretreated with blockers of the transforming growth factor (TGF) superfamily, purinergic signaling in response to DL was also eliminated. Further analysis showed that this pretreatment decreased contractility, implicating activity in the TGF pathway in the establishment of the baseline contractile state of MSCs (in the absence of exogenous ligands). These data indicate that chromatin condensation in response to DL is regulated through the interplay between purinergic and RhoA/Rock signaling, and that ligandless activity in the TGF/bone morphogenetic proteins signaling pathway contributes to the establishment of baseline contractility in MSCs. Copyright © 2016 Biophysical Society. Published by Elsevier Inc. All rights reserved.

  3. Coupling Dynamics Interlip Coordination in Lower Lip Load Compensation

    ERIC Educational Resources Information Center

    van Lieshout, Pascal; Neufeld, Chris

    2014-01-01

    Purpose: To study the effects of lower lip loading on lower and upper lip movements and their coordination to test predictions on coupling dynamics derived from studies in limb control. Method: Movement data were acquired using electromagnetic midsagittal articulography under 4 conditions: (a) without restrictions, serving as a baseline; (b) with…

  4. Optimal RTP Based Power Scheduling for Residential Load in Smart Grid

    NASA Astrophysics Data System (ADS)

    Joshi, Hemant I.; Pandya, Vivek J.

    2015-12-01

    To match supply and demand, shifting of load from peak period to off-peak period is one of the effective solutions. Presently flat rate tariff is used in major part of the world. This type of tariff doesn't give incentives to the customers if they use electrical energy during off-peak period. If real time pricing (RTP) tariff is used, consumers can be encouraged to use energy during off-peak period. Due to advancement in information and communication technology, two-way communications is possible between consumers and utility. To implement this technique in smart grid, home energy controller (HEC), smart meters, home area network (HAN) and communication link between consumers and utility are required. HEC interacts automatically by running an algorithm to find optimal energy consumption schedule for each consumer. However, all the consumers are not allowed to shift their load simultaneously during off-peak period to avoid rebound peak condition. Peak to average ratio (PAR) is considered while carrying out minimization problem. Linear programming problem (LPP) method is used for minimization. The simulation results of this work show the effectiveness of the minimization method adopted. The hardware work is in progress and the program based on the method described here will be made to solve real problem.

  5. Dental responsibility loadings and the relative value of dental services.

    PubMed

    Teusner, D N; Ju, X; Brennan, D S

    2017-09-01

    To estimate responsibility loadings for a comprehensive list of dental services, providing a standardized unit of clinical work effort. Dentists (n = 2500) randomly sampled from the Australian Dental Association membership (2011) were randomly assigned to one of 25 panels. Panels were surveyed by questionnaires eliciting responsibility loadings for eight common dental services (core items) and approximately 12 other items unique to that questionnaire. In total, loadings were elicited for 299 items listed in the Australian Dental Schedule 9th Edition. Data were weighted to reflect the age and sex distribution of the workforce. To assess reliability, regression models assessed differences in core item loadings by panel assignment. Estimated loadings were described by reporting the median and mean. Response rate was 37%. Panel composition did not vary by practitioner characteristics. Core item loadings did not vary by panel assignment. Oral surgery and endodontic service areas had the highest proportion (91%) of services with median loadings ≥1.5, followed by prosthodontics (78%), periodontics (76%), orthodontics (63%), restorative (62%) and diagnostic services (31%). Preventive services had median loadings ≤1.25. Dental responsibility loadings estimated by this study can be applied in the development of relative value scales. © 2017 Australian Dental Association.

  6. Therapeutic DNA vaccination of vertically HIV-infected children: report of the first pediatric randomised trial (PEDVAC).

    PubMed

    Palma, Paolo; Romiti, Maria Luisa; Montesano, Carla; Santilli, Veronica; Mora, Nadia; Aquilani, Angela; Dispinseri, Stefania; Tchidjou, Hyppolite K; Montano, Marco; Eriksson, Lars E; Baldassari, Stefania; Bernardi, Stefania; Scarlatti, Gabriella; Wahren, Britta; Rossi, Paolo

    2013-01-01

    Twenty vertically HIV-infected children, 6-16 years of age, with stable viral load control and CD4+ values above 400 cells/mm(3). Ten subjects continued their ongoing antiretroviral treatment (ART, Group A) and 10 were immunized with a HIV-DNA vaccine in addition to their previous therapy (ART and vaccine, Group B). The genetic vaccine represented HIV-1 subtypes A, B and C, encoded Env, Rev, Gag and RT and had no additional adjuvant. Immunizations took place at weeks 0, 4 and 12, with a boosting dose at week 36. Monitoring was performed until week 60 and extended to week 96. Safety data showed good tolerance of the vaccine. Adherence to ART remained high and persistent during the study and did not differ significantly between controls and vaccinees. Neither group experienced either virological failure or a decline of CD4+ counts from baseline. Higher HIV-specific cellular immune responses were noted transiently to Gag but not to other components of the vaccine. Lymphoproliferative responses to a virion antigen HIV-1 MN were higher in the vaccinees than in the controls (p = 0.047), whereas differences in reactivity to clade-specific Gag p24, RT or Env did not reach significance. Compared to baseline, the percentage of HIV-specific CD8+ lymphocytes releasing perforin in the Group B was higher after the vaccination schedule had been completed (p = 0.031). No increased CD8+ perforin levels were observed in control Group A. The present study demonstrates the feasibility, safety and moderate immunogenicity of genetic vaccination in vertically HIV-infected children, paving the way for amplified immunotherapeutic approaches in the pediatric population. clinicaltrialsregister.eu _2007-002359-18IT.

  7. Therapeutic DNA Vaccination of Vertically HIV-Infected Children: Report of the First Pediatric Randomised Trial (PEDVAC)

    PubMed Central

    Palma, Paolo; Romiti, Maria Luisa; Montesano, Carla; Santilli, Veronica; Mora, Nadia; Aquilani, Angela; Dispinseri, Stefania; Tchidjou, Hyppolite K.; Montano, Marco; Eriksson, Lars E.; Baldassari, Stefania; Bernardi, Stefania; Scarlatti, Gabriella

    2013-01-01

    Subjects Twenty vertically HIV-infected children, 6–16 years of age, with stable viral load control and CD4+ values above 400 cells/mm3. Intervention Ten subjects continued their ongoing antiretroviral treatment (ART, Group A) and 10 were immunized with a HIV-DNA vaccine in addition to their previous therapy (ART and vaccine, Group B). The genetic vaccine represented HIV-1 subtypes A, B and C, encoded Env, Rev, Gag and RT and had no additional adjuvant. Immunizations took place at weeks 0, 4 and 12, with a boosting dose at week 36. Monitoring was performed until week 60 and extended to week 96. Results Safety data showed good tolerance of the vaccine. Adherence to ART remained high and persistent during the study and did not differ significantly between controls and vaccinees. Neither group experienced either virological failure or a decline of CD4+ counts from baseline. Higher HIV-specific cellular immune responses were noted transiently to Gag but not to other components of the vaccine. Lymphoproliferative responses to a virion antigen HIV-1 MN were higher in the vaccinees than in the controls (p = 0.047), whereas differences in reactivity to clade-specific Gag p24, RT or Env did not reach significance. Compared to baseline, the percentage of HIV-specific CD8+ lymphocytes releasing perforin in the Group B was higher after the vaccination schedule had been completed (p = 0.031). No increased CD8+ perforin levels were observed in control Group A. Conclusions The present study demonstrates the feasibility, safety and moderate immunogenicity of genetic vaccination in vertically HIV-infected children, paving the way for amplified immunotherapeutic approaches in the pediatric population. Trial registration clinicaltrialsregister.eu _2007-002359-18 IT PMID:24312194

  8. Humoral and cell-mediated immune responses after a booster dose of HBV vaccine in HIV-infected children, adolescents and young adults.

    PubMed

    Giacomet, Vania; Masetti, Michela; Nannini, Pilar; Forlanini, Federica; Clerici, Mario; Zuccotti, Gian Vincenzo; Trabattoni, Daria

    2018-01-01

    HBV vaccine induces protective antibodies only in 23-56% of HIV-infected children. The aim of our study is to evaluate the immunologic effects of a booster dose of HBV vaccine in HIV-infected youth. 53 young HIV-infected patients in whom HBV vaccination did not elicit protective Ab titers were enrolled. All patients were on ART with optimal immunological and viral response. All patients received a booster dose of HBV vaccine (HBVAXPRO 10 μg i.m.). HBV-specific Ab titer, viral load and CD4+ T cells were measured at baseline (T0), T1, T6 and T12 months. In a subgroup of 16 patients HBV-specific cell mediated immune responses were evaluated at baseline, at T1 and T6. The booster dose induced seroconversion in 51% of patients at T1, 57% at T6, and49% at T12; seroconversion rate was significantly correlated with CD4+T cells at T0 and to the CD4 nadir. The booster dose induced HBV-specific cell mediated immunity at T6 mainly in Responders (Rs): Effector Memory CD8+T cells, HBV-specific TNFα-, IFNγ-, granzyme secreting CD8+ T cells and IL2-secreting CD4+ T cells were significantly increased in Rs compared to T0. In Non Responders (NRs), HBV-specific IL2-secreting CD4+ T cells, Central and Effector Memory CD8+ T cells were the only parameters modified at T6. Seroconversion induced by a booster dose of vaccine correlates with the development of T cell immunological memory in HIV-infected patients who did not respond to the standard immunization. Alternate immunization schedules need to be considered in NRs.

  9. Role and Determinants of Adherence to Off-loading in Diabetic Foot Ulcer Healing: A Prospective Investigation.

    PubMed

    Crews, Ryan T; Shen, Biing-Jiun; Campbell, Laura; Lamont, Peter J; Boulton, Andrew J M; Peyrot, Mark; Kirsner, Robert S; Vileikyte, Loretta

    2016-08-01

    Studies indicate that off-loading adherence is low in patients with diabetic foot ulcers (DFUs), which may subsequently delay healing. However, there is little empirical evidence for this relationship or the factors that influence adherence. This prospective, multicenter, international study of 79 (46 from the U.K. and 33 the U.S.) persons with type 2 diabetes and plantar DFUs assessed the association between off-loading adherence and DFU healing over a 6-week period. Additionally, potential demographic, disease, and psychological determinants of adherence were examined. DFUs were off-loaded with a removable device (77% a removable cast walker). Off-loading adherence was assessed objectively by activity monitors. Patient-reported measures included Hospital Anxiety and Depression Scale (HADS), Neuropathy and Foot Ulcer Quality of Life (NeuroQoL) instrument, and Revised Illness Perception Questionnaire (IPQ-R). Off-loading adherence was monitored for 35 ± 10 days, and devices were used during 59 ± 22% of subjects' activity. In multivariate analyses, smaller baseline DFU size, U.K. study site, and better off-loading adherence predicted smaller DFU size at 6 weeks (P < 0.05). Better off-loading adherence was, in turn, predicted by larger and more severe baseline DFUs, more severe neuropathy, and NeuroQoL foot pain (P < 0.05). In contrast, greater NeuroQoL postural instability predicted worse off-loading adherence (P < 0.001). HADS and IPQ-R measures were not significantly associated with off-loading adherence. Off-loading adherence is associated with the amount of DFU healing that occurs, while postural instability is a powerful predictor of nonadherence. Clinicians should take this neuropathic symptom into consideration when selecting an off-loading device, as off-loading-induced postural instability may further contribute to nonadherence. © 2016 by the American Diabetes Association. Readers may use this article as long as the work is properly cited, the use is educational and not for profit, and the work is not altered.

  10. Predicting the Satisfaction and Loyalty of Adjunct Faculty

    ERIC Educational Resources Information Center

    Hoyt, Jeff E.

    2012-01-01

    Satisfaction with the quality of students, autonomy, faculty support, honorarium, and preference for teaching were significant predictors of adjunct faculty loyalty. With the exception of autonomy, these factors along with a heavy teaching load, collaborative research with full-time faculty, and satisfaction with teaching schedule were predictive…

  11. Using WRF-Urban to Assess Summertime Air Conditioning Electric Loads and Their Impacts on Urban Weather in Beijing

    NASA Astrophysics Data System (ADS)

    Xu, Xiaoyu; Chen, Fei; Shen, Shuanghe; Miao, Shiguang; Barlage, Michael; Guo, Wenli; Mahalov, Alex

    2018-03-01

    The air conditioning (AC) electric loads and their impacts on local weather over Beijing during a 5 day heat wave event in 2010 are investigated by using the Weather Research and Forecasting (WRF) model, in which the Noah land surface model with multiparameterization options (Noah-MP) is coupled to the multilayer Building Effect Parameterization and Building Energy Model (BEP+BEM). Compared to the legacy Noah scheme coupled to BEP+BEM, this modeling system shows a better performance, decreasing the root-mean-square error of 2 m air temperature to 1.9°C for urban stations. The simulated AC electric loads in suburban and rural districts are significantly improved by introducing the urban class-dependent building cooled fraction. Analysis reveals that the observed AC electric loads in each district are characterized by a common double peak at 3 p.m. and at 9 p.m. local standard time, and the incorporation of more realistic AC working schedules helps reproduce the evening peak. Waste heat from AC systems has a smaller effect ( 1°C) on the afternoon 2 m air temperature than the evening one (1.5 2.4°C) if AC systems work for 24 h and vent sensible waste heat into air. Influences of AC systems can only reach up to 400 m above the ground for the evening air temperature and humidity due to a shallower urban boundary layer than daytime. Spatially varying maps of AC working schedules and the ratio of sensible to latent waste heat release are critical for correctly simulating the cooling electric loads and capturing the thermal stratification of urban boundary layer.

  12. A Human-Centered Smart Home System with Wearable-Sensor Behavior Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ji, Jianting; Liu, Ting; Shen, Chao

    Smart home has recently attracted much research interest owing to its potential in improving the quality of human life. How to obtain user's demand is the most important and challenging task for appliance optimal scheduling in smart home, since it is highly related to user's unpredictable behavior. In this paper, a human-centered smart home system is proposed to identify user behavior, predict their demand and schedule the household appliances. Firstly, the sensor data from user's wearable devices are monitored to profile user's full-day behavior. Then, the appliance-demand matrix is constructed to predict user's demand on home environment, which is extractedmore » from the history of appliance load data and user behavior. Two simulations are designed to demonstrate user behavior identification, appliance-demand matrix construction and strategy of appliance optimal scheduling generation.« less

  13. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  14. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  15. Approaches to Enable Demand Response by Industrial Loads for Ancillary Services Provision

    NASA Astrophysics Data System (ADS)

    Zhang, Xiao

    Demand response has gained significant attention in recent years as it demonstrates potentials to enhance the power system's operational flexibility in a cost-effective way. Industrial loads such as aluminum smelters, steel manufacturers, and cement plants demonstrate advantages in supporting power system operation through demand response programs, because of their intensive power consumption, already existing advanced monitoring and control infrastructure, and the strong economic incentive due to the high energy costs. In this thesis, we study approaches to efficiently integrate each of these types of manufacturing processes as demand response resources. The aluminum smelting process is able to change its power consumption both accurately and quickly by controlling the pots' DC voltage, without affecting the production quality. Hence, an aluminum smelter has both the motivation and the ability to participate in demand response. First, we focus on determining the optimal regulation capacity that such a manufacturing plant should provide. Next, we focus on determining its optimal bidding strategy in the day-ahead energy and ancillary services markets. Electric arc furnaces (EAFs) in steel manufacturing consume a large amount of electric energy. However, a steel plant can take advantage of time-based electricity prices by optimally arranging energy-consuming activities to avoid peak hours. We first propose scheduling methods that incorporate the EAFs' flexibilities to reduce the electricity cost. We then propose methods to make the computations more tractable. Finally, we extend the scheduling formulations to enable the provision of spinning reserve. Cement plants are able to quickly adjust their power consumption rate by switching on/off the crushers. However, switching on/off the loading units only achieves discrete power changes, which restricts the load from offering valuable ancillary services such as regulation and load following, as continuous power changes are required for these services. We propose methods that enable these services with the support of an on-site energy storage device. As demonstrated by the case studies, the proposed approaches are effective and can generate practical production instructions for the industrial loads. This thesis not only provides methods to enable demand response by industrial loads but also potentially encourages industrial loads to be active in electricity markets.

  16. A microstructural analysis of schedule-induced polydipsia reveals incentive-induced hyperactivity in an animal model of ADHD

    PubMed Central

    Íbias, Javier; Pellón, Ricardo; Sanabria, Federico

    2014-01-01

    Recent research has suggested that frequent short bursts of activity characterize hyperactivity associated with attention deficit hyperactivity disorder (ADHD). This study determined whether such pattern is also visible in schedule-induced polydipsia (SIP) in the spontaneously hypertensive rat (SHR), an animal model of ADHD. Male SHR, Wistar Kyoto (WKY) and Wistar rats were exposed to 40 sessions of SIP using a multiple fixed-time (FT) schedule of food delivery with FT 30-s and FT 90-s components. Stable performance was analysed to determine the extent to which SIP-associated drinking is organized in bouts. The Bi-Exponential Refractory Model (BERM) of free-operant performance was applied to schedule-induced licks. A model comparison analysis supported BERM as a description of SIP episodes: licks were not produced at a constant rate but organized into bouts within drinking episodes. FT 30-s induced similar overall licking rates, latencies to first licks and episode durations across strains; FT 90-s induced longer episode durations in SHRs and reduced licking rate in WKY and Wistar rats to nearly baseline levels. Across schedules, SHRs made more and shorter bouts when compared to the other strains. These results suggest an incentive-induced hyperactivity in SHR that has been observed in operant behavior and in children with ADHD. PMID:25447297

  17. Symptom load and general function among patients with erythema migrans: a prospective study with a 1-year follow-up after antibiotic treatment in Norwegian general practice.

    PubMed

    Eliassen, Knut Eirik; Hjetland, Reidar; Reiso, Harald; Lindbæk, Morten; Tschudi-Madsen, Hedda

    2017-03-01

    Promptly treated erythema migrans (EM) has good prognosis. However, some patients report persistent symptoms. Do patients with EM have more symptoms than the general population? We describe individual symptoms and general function in EM-patients at time of diagnosis and one year after treatment. Prospective study with 1-year follow up after treatment. Questionnaires included a modified version of the Subjective Health Complaints Inventory, comprising three additional Lyme borreliosis (LB) related symptoms. General function was assessed using a five-point scale modified from the COOP/WONCA charts. Norwegian general practice. A total of 188 patients were included in a randomized controlled trial comparing three antibiotic regimens for EM, of whom 139 had complete data for this study. Individual symptoms, symptom load and general function. Mild symptoms were common, reported by 84.9% at baseline and by 85.6% at follow-up. At baseline, patients reported a mean of 5.4 symptoms, compared with 6.2 after one year. Severely bothersome symptoms and severely impaired general function were rare. Tiredness was the most reported symptom both at baseline and at follow-up. Palsy (other than facial) was the least reported symptom, but the only one with a significant increase. However, this was not associated to the EM. The symptom load was comparable to that reported in the general population. We found an increase in symptom load at follow-up that did not significantly affect general function. Monitoring patients' symptom loads prior to treatment reduce the probability of attributing follow-up symptoms to LB. Key points Erythema migrans has a good prognosis.Patients treated for erythema migrans have a slight increase in symptom load one year after treatment. This increase does not affect general function. The levels of subjective health complaints in patients treated for erythema migrans are comparable to the background population.

  18. Visualizing and Integrating AFSCN Utilization into a Common Operational Picture

    NASA Astrophysics Data System (ADS)

    Hays, B.; Carlile, A.; Mitchell, T.

    The Department of Defense (DoD) and the 50th Space Network Operations Group Studies and Analysis branch (50th SCS/SCXI), located at Schriever AFB Colorado, face the unique challenge of forecasting the expected near term and future utilization of the Air Force Satellite Control Network (AFSCN). The forecasting timeframe covers the planned load from the current date to ten years out. The various satellite missions, satellite requirements, orbital regions, and ground architecture dynamics provide the model inputs and constraints that are used in generating the forecasted load. The AFSCN is the largest network the Air Force uses to control satellites worldwide. Each day, network personnel perform over 500 scheduled events-from satellite maneuvers to critical data downloads. The Forecasting Objective is to provide leadership with the insights necessary to manage the network today and tomorrow. For both today's needs and future needs, SCXI develops AFSCN utilization forecasts to optimize the ground system's coverage and capacity to meet user satellite requirements. SCXI also performs satellite program specific studies to determine network support feasibility. STK and STK Scheduler form the core of the tools used by SCXI. To establish this tool suite, we had to evaluate, evolve, and validate both the COTS products and our own developed code and processes. This began with calibrating the network model to emulate the real life scheduling environment of the AFSCN. Multiple STK Scheduler optimizing (de-confliction) algorithms, including Multi-Pass, Sequential, Random, and Neural, were evaluated and adjusted to determine applicability to the model and the accuracy of the prediction. Additionally, the scheduling Figure of Merit (FOM), which permits custom weighting of various parameters, was analyzed and tested to achieve the most accurate real life result. With the inherent capabilities of STK and the ability to wrap and automate output, SCXI is now able to visually communicate satellite loads in a manner never seen before in AFSCN management meetings. Scenarios such as regional antenna load stress, satellite missed opportunities, and the overall network "big picture" can be visually displayed in 3D versus the textual and line graph methods used for many years. This is the first step towards an integrated space awareness picture with an operational focus. SCXI is working on taking the visual forecast concept farther and begin fusing multiple sources of data to build a 50 SW Common Operating Picture (COP). The vision is to integrate more effective orbital determination processes, resource outages, current and forecasted satellite mission requirements, and future architectural changes into a real-time visual status to enable quick and responsive decisions. This COP would be utilized in a Wing Operations Center to provide up to the minute network status on where satellites are, which ground resources are in contact with them, and what resources are down. The ability to quickly absorb and process this data will enhance decision analysis and save valuable time in both day to day operations and wartime scenarios.

  19. Feasibility Analysis for a Manned Mars Free-Return Mission in 2018

    NASA Technical Reports Server (NTRS)

    Tito, Dennis A.; Anderson, Grant; Carrico, John P., Jr.; Clark, Jonathan; Finger, Barry; Lantz, Gary A.; Loucks, Michel E.; MacCallum, Taber; Poynter, Jane; Squire, Thomas H.; hide

    2013-01-01

    In 1998 Patel et al searched for Earth-Mars free-return trajectories that leave Earth, fly by Mars, and return to Earth without any deterministic maneuvers after Trans-Mars Injection. They found fast trajectory opportunities occurring two times every 15 years with a 1.4-year duration, significantly less than most Mars free return trajectories, which take up to 3.5 years. This paper investigates these fast trajectories. It also determines the launch and life support feasibility of flying such a mission using hardware expected to be available in time for an optimized fast trajectory opportunity in January, 2018. The authors optimized the original trajectory using patched-conic approximations, and then modeled the trajectory using numerical integration with high fidelity force models and the JPL planetary ephemerides. We calculated an optimum trajectory launching in early January, 2018. At the Mars encounter, the spacecraft will pass within a few hundred kilometers of the surface. We investigated the Earth reentry conditions and developed some aerocapture options to mitigate G-loads on the returning crew. We also describe tradeoffs and studies necessary to develop the Thermal Protection System (TPS). To size the Environmental Control and Life Support System (ECLSS) we set the initial mission assumption to two crew members for 500 days in a modified SpaceX Dragon class of vehicle. The journey is treated as a high-risk mission, which drives towards reliable - but minimalist - accommodations and provisions. As such, we investigated State Of the Art (SOA) technologies that would meet only basic human needs to support metabolic requirements and limited crew comfort allowances. We compare a baseline SOA architecture with an advanced architecture. The advanced architecture uses recently developed equipment that has higher efficiencies for water recovery and lighter base mass. They are not currently in operation and therefore present a schedule risk for development and testing. We also present a notional schedule based on state of the art ECLSS technologies. ECLSS is a systems-integration-intense subsystem, so actual schedule is highly dependent on the vehicle integration schedule and timeline. The isolated, confined environment psychology aspects of the mission are considered with regard to crew selection, training, capsule design, the role of mission control / support, and early ground testing. We explore analogues such as Biosphere 2 and long duration spaceflight. We show that an ECLSS based on SOA technologies is feasible and can be ready for January 2018. A minimalist approach using existing technologies can be safely and robustly realized by utilizing spares and a crew capable of servicing and replacing the equipment.

  20. Cortisol, reaction time test and health among offshore shift workers.

    PubMed

    Harris, Anette; Waage, Siri; Ursin, Holger; Hansen, Ase Marie; Bjorvatn, Bjørn; Eriksen, Hege R

    2010-10-01

    The stress hormone cortisol shows a pronounced endogenous diurnal rhythm, which is affected by the sleep/wake cycle, meals and activity. Shift work and especially night work disrupts the sleep/wake cycle and causes a desynchronization of the natural biological rhythms. Therefore, different shift schedules may have different impact on performance at work and health. The purpose was to study if health, reaction time, and the cortisol rhythm were negatively affected when a group of shift workers changed their work schedule from ordinary day-night shift (fixed shift) to "swing shift". 19 healthy workers on a Norwegian oil rig participated in the study. They worked 2 weeks offshore followed by 4 weeks off work. The ordinary schedule consisted of 12-h day shift and 12-h night shift every other work period (14 days or nights=fixed shift). "Swing shift" involved 1 week of night shift, followed by 1 week of day shift during the work period. All participants worked ordinary day-night shift when baseline data were collected (questionnaires, saliva cortisol, and reaction time during work). After collection of baseline data the workers changed their work schedule to "swing shift", for every working period, and 9 months later the same data were collected. "Swing shift" did not give any negative health effects or any negative changes in reaction time during the day they shifted from night work to day work. Personnel adapted to night shift within a week regardless of schedule, but recovery from night shift took longer time. During swing shift the cortisol rhythm went back towards a normal rhythm in the second week, but it was not returned completely to normal values when they returned home for the 4 weeks off period. However, the cortisol rhythms were readapted to normal values after 1 week at home. For personnel returning home directly from 14 consecutive night shifts, cortisol adaptation was not complete after 1 week at home. We found no increase in health complaints from swing shift or reaction time in the shift from night to day work. Recovery from night shift takes longer time. Copyright © 2010 Elsevier Ltd. All rights reserved.

  1. San Francisco Bay Area Baseline Trash Loading Summary Results for all counties

    EPA Pesticide Factsheets

    The San Francisco Bay Area stormwater permit sets trash control guidelines for discharges through the storm drain system. The permit covers Alameda, Contra Costa, Santa Clara, and San Mateo counties and the cities of Vallejo, Fairfield, and Suisun City. By February 2012 the permittees must provide a baseline trash load estimate, a list of trash hotspots targeted for annual cleanup, and an implementation plan for best management practices to meet trash reduction milestones over the next decade. A trash reduction crediting program will be used to account for best management practice effectiveness. The permit establishes goals for trash reduction beginning in 2014 and reaching a zero level by 2022.

  2. Phenoloxidase but not lytic activity reflects resistance against Pasteuria ramosa in Daphnia magna

    PubMed Central

    Pauwels, Kevin; De Meester, Luc; Decaestecker, Ellen; Stoks, Robby

    2011-01-01

    The field of ecological immunology strongly relies on indicators of immunocompetence. Two major indicators in invertebrates, the activity of phenoloxidase (PO) and lytic activity have recently been questioned in studies showing that, across a natural range of baseline levels, these indicators did not predict resistance against a manipulated challenge with natural parasites. We confirmed this finding by showing that baseline levels of PO and lytic activity in the host Daphnia magna were not related to spore load of the parasite Pasteuria ramosa. Yet, PO levels in infected hosts did predict spore load, indicating PO activity can be useful as an indicator of immunocompetence in this model parasite–host system. PMID:20810432

  3. Phenoloxidase but not lytic activity reflects resistance against Pasteuria ramosa in Daphnia magna.

    PubMed

    Pauwels, Kevin; De Meester, Luc; Decaestecker, Ellen; Stoks, Robby

    2011-02-23

    The field of ecological immunology strongly relies on indicators of immunocompetence. Two major indicators in invertebrates, the activity of phenoloxidase (PO) and lytic activity have recently been questioned in studies showing that, across a natural range of baseline levels, these indicators did not predict resistance against a manipulated challenge with natural parasites. We confirmed this finding by showing that baseline levels of PO and lytic activity in the host Daphnia magna were not related to spore load of the parasite Pasteuria ramosa. Yet, PO levels in infected hosts did predict spore load, indicating PO activity can be useful as an indicator of immunocompetence in this model parasite-host system.

  4. Influence of inspiratory resistive loading on expiratory muscle fatigue in healthy humans.

    PubMed

    Peters, Carli M; Welch, Joseph F; Dominelli, Paolo B; Molgat-Seon, Yannick; Romer, Lee M; McKenzie, Donald C; Sheel, A William

    2017-09-01

    What is the central question of this study? This study is the first to measure objectively both inspiratory and expiratory muscle fatigue after inspiratory resistive loading to determine whether the expiratory muscles are activated to the point of fatigue when specifically loading the inspiratory muscles. What is the main finding and its importance? The absence of abdominal muscle fatigue suggests that future studies attempting to understand the neural and circulatory consequences of diaphragm fatigue can use inspiratory resistive loading without considering the confounding effects of abdominal muscle fatigue. Expiratory resistive loading elicits inspiratory as well as expiratory muscle fatigue, suggesting parallel coactivation of the inspiratory muscles during expiration. It is unknown whether the expiratory muscles are likewise coactivated to the point of fatigue during inspiratory resistive loading (IRL). The purpose of this study was to determine whether IRL elicits expiratory as well as inspiratory muscle fatigue. Healthy male subjects (n = 9) underwent isocapnic IRL (60% maximal inspiratory pressure, 15 breaths min -1 , 0.7 inspiratory duty cycle) to task failure. Abdominal and diaphragm contractile function was assessed at baseline and at 3, 15 and 30 min post-IRL by measuring gastric twitch pressure (P ga,tw ) and transdiaphragmatic twitch pressure (P di,tw ) in response to potentiated magnetic stimulation of the thoracic and phrenic nerves, respectively. Fatigue was defined as a significant reduction from baseline in P ga,tw or P di,tw . Throughout IRL, there was a time-dependent increase in cardiac frequency and mean arterial blood pressure, suggesting activation of the respiratory muscle metaboreflex. The P di,tw was significantly lower than baseline (34.3 ± 9.6 cmH 2 O) at 3 (23.2 ± 5.7 cmH 2 O, P < 0.001), 15 (24.2 ± 5.1 cmH 2 O, P < 0.001) and 30 min post-IRL (26.3 ± 6.0 cmH 2 O, P < 0.001). The P ga,tw was not significantly different from baseline (37.6 ± 17.1 cmH 2 O) at 3 (36.5 ± 14.6 cmH 2 O), 15 (33.7 ± 12.4 cmH 2 O) and 30 min post-IRL (32.9 ± 11.3 cmH 2 O). Inspiratory resistive loading elicits objective evidence of diaphragm, but not abdominal, muscle fatigue. Agonist-antagonist interactions for the respiratory muscles appear to be more important during expiratory versus inspiratory loading. © 2017 The Authors. Experimental Physiology © 2017 The Physiological Society.

  5. Visual-spatial processing and working-memory load as a function of negative and positive psychotic-like experiences.

    PubMed

    Abu-Akel, A; Reniers, R L E P; Wood, S J

    2016-09-01

    Patients with schizophrenia show impairments in working-memory and visual-spatial processing, but little is known about the dynamic interplay between the two. To provide insight into this important question, we examined the effect of positive and negative symptom expressions in healthy adults on perceptual processing while concurrently performing a working-memory task that requires the allocations of various degrees of cognitive resources. The effect of positive and negative symptom expressions in healthy adults (N = 91) on perceptual processing was examined in a dual-task paradigm of visual-spatial working memory (VSWM) under three conditions of cognitive load: a baseline condition (with no concurrent working-memory demand), a low VSWM load condition, and a high VSWM load condition. Participants overall performed more efficiently (i.e., faster) with increasing cognitive load. This facilitation in performance was unrelated to symptom expressions. However, participants with high-negative, low-positive symptom expressions were less accurate in the low VSWM condition compared to the baseline and the high VSWM load conditions. Attenuated, subclinical expressions of psychosis affect cognitive performance that is impaired in schizophrenia. The "resource limitations hypothesis" may explain the performance of the participants with high-negative symptom expressions. The dual-task of visual-spatial processing and working memory may be beneficial to assessing the cognitive phenotype of individuals with high risk for schizophrenia spectrum disorders.

  6. Human T-cell leukemia virus type I (HTLV-1) proviral load and disease progression in asymptomatic HTLV-1 carriers: a nationwide prospective study in Japan.

    PubMed

    Iwanaga, Masako; Watanabe, Toshiki; Utsunomiya, Atae; Okayama, Akihiko; Uchimaru, Kaoru; Koh, Ki-Ryang; Ogata, Masao; Kikuchi, Hiroshi; Sagara, Yasuko; Uozumi, Kimiharu; Mochizuki, Manabu; Tsukasaki, Kunihiro; Saburi, Yoshio; Yamamura, Masaomi; Tanaka, Junji; Moriuchi, Yukiyoshi; Hino, Shigeo; Kamihira, Shimeru; Yamaguchi, Kazunari

    2010-08-26

    Definitive risk factors for the development of adult T-cell leukemia (ATL) among asymptomatic human T-cell leukemia virus type I (HTLV-1) carriers remain unclear. Recently, HTLV-1 proviral loads have been evaluated as important predictors of ATL, but a few small prospective studies have been conducted. We prospectively evaluated 1218 asymptomatic HTLV-1 carriers (426 males and 792 females) who were enrolled during 2002 to 2008. The proviral load at enrollment was significantly higher in males than females (median, 2.10 vs 1.39 copies/100 peripheral blood mononuclear cells [PBMCs]; P < .001), in those 40 to 49 and 50 to 59 years of age than that of those 40 years of age and younger (P = .02 and .007, respectively), and in those with a family history of ATL than those without the history (median, 2.32 vs 1.33 copies/100 PBMCs; P = .005). During follow-up, 14 participants progressed to overt ATL. Their baseline proviral load was high (range, 4.17-28.58 copies/100 PBMCs). None developed ATL among those with a baseline proviral load lower than approximately 4 copies. Multivariate Cox analyses indicated that not only a higher proviral load, advanced age, family history of ATL, and first opportunity for HTLV-1 testing during treatment for other diseases were independent risk factors for progression of ATL.

  7. An Evaluation of the HVAC Load Potential for Providing Load Balancing Service

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lu, Ning

    This paper investigates the potential of providing aggregated intra-hour load balancing services using heating, ventilating, and air-conditioning (HVAC) systems. A direct-load control algorithm is presented. A temperature-priority-list method is used to dispatch the HVAC loads optimally to maintain consumer-desired indoor temperatures and load diversity. Realistic intra-hour load balancing signals were used to evaluate the operational characteristics of the HVAC load under different outdoor temperature profiles and different indoor temperature settings. The number of HVAC units needed is also investigated. Modeling results suggest that the number of HVACs needed to provide a {+-}1-MW load balancing service 24 hours a day variesmore » significantly with baseline settings, high and low temperature settings, and the outdoor temperatures. The results demonstrate that the intra-hour load balancing service provided by HVAC loads meet the performance requirements and can become a major source of revenue for load-serving entities where the smart grid infrastructure enables direct load control over the HAVC loads.« less

  8. Shift Schedules and Intern Work Hours, Patient Numbers, Conference Attendance, and Sleep at a Single Pediatric Residency Program.

    PubMed

    Kocolas, Irene; Day, Kristen; King, Marta; Stevenson, Adam; Sheng, Xiaoming; Hobson, Wendy; Bruse, Jaime; Bale, James

    2017-03-01

    The effects of 2011 Accreditation Council on Graduate Medical Education (ACGME) duty hour standards on intern work hours, patient load, conference attendance, and sleep have not been fully determined. We prospectively compared intern work hours, patient numbers, conference attendance, sleep duration, pattern, and quality in a 2011 ACGME duty hour-compliant shift schedule with a 2003 ACGME duty hour-compliant call schedule at a single pediatric residency program. Interns were assigned to shift or call schedules during 4 alternate months in the winter of 2010-2011. Work hours, patient numbers, conference attendance, sleep duration, pattern, and quality were tracked. Interns worked significantly fewer hours per week on day (73.2 hours) or night (71.6 hours) shifts than during q4 call (79.6 hours; P < .01). During high census months, shift schedule interns cared for significantly more patients/day (8.1/day shift vs 6.2/call; P < .001) and attended significantly fewer conferences than call schedule interns. Night shift interns slept more hours per 24-hour period than call schedule interns (7.2 ± 0.5 vs 6.3 ± 0.9 hours; P < .05) and had more consistent sleep patterns. A shift schedule resulted in reduced intern work hours and improved sleep duration and pattern. Although intern didactic conference attendance declined significantly during high census months, opportunities for experiential learning remained robust with unchanged or increased intern patient numbers. Copyright © 2016 Academic Pediatric Association. Published by Elsevier Inc. All rights reserved.

  9. Increased supraspinatus tendon thickness following fatigue loading in rotator cuff tendinopathy: potential implications for exercise therapy.

    PubMed

    McCreesh, Karen M; Purtill, Helen; Donnelly, Alan E; Lewis, Jeremy S

    2017-01-01

    Exercise imparts a load on tendon tissue that leads to changes in tendon properties. Studies suggest that loading immediately reduces tendon thickness, with a loss of this response in symptomatic tendinopathy. No studies investigating the response of tendon dimensions to load for the rotator cuff tendons exist. This study aimed to examine the short-term effect of loading on the thickness of the supraspinatus tendon and acromiohumeral distance those with and without rotator cuff tendinopathy. Participants were 20 painfree controls, and 23 people with painful rotator cuff tendinopathy. Supraspinatus tendon thickness and acromiohumeral distance were measured using ultrasound scans before, and at three time points after loading (1, 6 and 24 hours). Loading involved isokinetic eccentric and concentric external rotation and abduction. There was a significant increase in supraspinatus tendon thickness in the pain group at 1 (7%, ∆=0.38, 95% CI 0.19 to 0.57) and 6 hours (11%, ∆=0.53, 95% CI 0.34 to 0.71), although only the 6 hours difference exceeded minimal detectable difference. In contrast, there was a small non-significant reduction in thickness in controls. The acromiohumeral distance reduced significantly in both groups at 1 hour (controls: ∆=0.64, 95% CI 0.38 to 0.90; pain: ∆=1.1, 95% CI 0.85 to 1.33), with a larger change from baseline in the pain group. Those diagnosed with painful supraspinatus tendinopathy demonstrated increased thickening with delayed return to baseline following loading. Rehabilitation professionals may need to take into account the impact of loading to fatigue when planning rehabilitation programmes.

  10. Increased supraspinatus tendon thickness following fatigue loading in rotator cuff tendinopathy: potential implications for exercise therapy

    PubMed Central

    McCreesh, Karen M; Purtill, Helen; Donnelly, Alan E; Lewis, Jeremy S

    2017-01-01

    Background/aim Exercise imparts a load on tendon tissue that leads to changes in tendon properties. Studies suggest that loading immediately reduces tendon thickness, with a loss of this response in symptomatic tendinopathy. No studies investigating the response of tendon dimensions to load for the rotator cuff tendons exist. This study aimed to examine the short-term effect of loading on the thickness of the supraspinatus tendon and acromiohumeral distance those with and without rotator cuff tendinopathy. Methods Participants were 20 painfree controls, and 23 people with painful rotator cuff tendinopathy. Supraspinatus tendon thickness and acromiohumeral distance were measured using ultrasound scans before, and at three time points after loading (1, 6 and 24 hours). Loading involved isokinetic eccentric and concentric external rotation and abduction. Results There was a significant increase in supraspinatus tendon thickness in the pain group at 1 (7%, ∆=0.38, 95% CI 0.19 to 0.57) and 6 hours (11%, ∆=0.53, 95% CI 0.34 to 0.71), although only the 6 hours difference exceeded minimal detectable difference. In contrast, there was a small non-significant reduction in thickness in controls. The acromiohumeral distance reduced significantly in both groups at 1 hour (controls: ∆=0.64, 95% CI 0.38 to 0.90; pain: ∆=1.1, 95% CI 0.85 to 1.33), with a larger change from baseline in the pain group. Conclusion Those diagnosed with painful supraspinatus tendinopathy demonstrated increased thickening with delayed return to baseline following loading. Rehabilitation professionals may need to take into account the impact of loading to fatigue when planning rehabilitation programmes. PMID:29333279

  11. Using Forecasting to Predict Long-Term Resource Utilization for Web Services

    ERIC Educational Resources Information Center

    Yoas, Daniel W.

    2013-01-01

    Researchers have spent years understanding resource utilization to improve scheduling, load balancing, and system management through short-term prediction of resource utilization. Early research focused primarily on single operating systems; later, interest shifted to distributed systems and, finally, into web services. In each case researchers…

  12. MICROORGANISM DIE-OFF RATES UNDER VARIOUS CONDITIONS

    EPA Science Inventory

    New York-New Jersey (NY-NJ) Harbor Estuary Program is charged to undertake an assessment of New York City Combined Sewer Overflow (NYC CSO) model for use in developing Total Maximum Daily Loads (TMDLs) which are scheduled for submission to EPA Region 2 by May 2006. A TMDL is def...

  13. School Leaders Target Salary Reform toward Newer Teachers

    ERIC Educational Resources Information Center

    Sawchuk, Stephen

    2009-01-01

    Leaders in a handful of school districts are pondering the idea of "front-loading" teacher compensation by paying novices more than they would typically earn under traditional salary schedules. Boosting new teachers' salaries, officials in Denver, the District of Columbia, and New York City contend, would increase the applicant pool and…

  14. Automated Power-Distribution System

    NASA Technical Reports Server (NTRS)

    Ashworth, Barry; Riedesel, Joel; Myers, Chris; Miller, William; Jones, Ellen F.; Freeman, Kenneth; Walsh, Richard; Walls, Bryan K.; Weeks, David J.; Bechtel, Robert T.

    1992-01-01

    Autonomous power-distribution system includes power-control equipment and automation equipment. System automatically schedules connection of power to loads and reconfigures itself when it detects fault. Potential terrestrial applications include optimization of consumption of power in homes, power supplies for autonomous land vehicles and vessels, and power supplies for automated industrial processes.

  15. Single-stage experimental evaluation of tandem-airfoil rotor and stator blading for compressors, part 8

    NASA Technical Reports Server (NTRS)

    Brent, J. A.; Clemmons, D. R.

    1974-01-01

    An experimental investigation was conducted with an 0.8 hub/tip ratio, single-stage, axial flow compressor to determine the potential of tandem-airfoil blading for improving the efficiency and stable operating range of compressor stages. The investigation included testing of a baseline stage with single-airfoil blading and two tandem-blade stages. The overall performance of the baseline stage and the tandem-blade stage with a 20-80% loading split was considerably below the design prediction. The other tandem-blade stage, which had a rotor with a 50-50% loading split, came within 4.5% of the design pressure rise (delta P(bar)/P(bar) sub 1) and matched the design stage efficiency. The baseline stage with single-airfoil blading, which was designed to account for the actual rotor inlet velocity profile and the effects of axial velocity ratio and secondary flow, achieved the design predicted performance. The corresponding tandem-blade stage (50-50% loading split in both blade rows) slightly exceeded the design pressure rise but was 1.5 percentage points low in efficiency. The tandem rotors tested during both phases demonstrated higher pressure rise and efficiency than the corresponding single-airfoil rotor, with identical inlet and exit airfoil angles.

  16. Displacements of the earth's surface due to atmospheric loading - Effects of gravity and baseline measurements

    NASA Technical Reports Server (NTRS)

    Van Dam, T. M.; Wahr, J. M.

    1987-01-01

    Atmospheric mass loads and deforms the earth's crust. By performing a convolution sum between daily, global barometric pressure data and mass loading Green's functions, the time dependent effects of atmospheric loading, including those associated with short-term synoptic storms, on surface point positioning measurements and surface gravity observations are estimated. The response for both an oceanless earth and an earth with an inverted barometer ocean is calculated. Load responses for near-coastal stations are significantly affected by the inclusion of an inverted barometer ocean. Peak-to-peak vertical displacements are frequently 15-20 mm with accompanying gravity perturbations of 3-6 micro Gal. Baseline changes can be as large as 20 mm or more. The perturbations are largest at higher latitudes and during winter months. These amplitudes are consistent with the results of Rabbel and Zschau (1985), who modeled synoptic pressure disturbances as Gaussian functions of radius around a central point. Deformation can be adequately computed using real pressure data from points within about 1000 km of the station. Knowledge of local pressure, alone, is not sufficient. Rabbel and Zschau's hypothesized corrections for these displacements, which use local pressure and the regionally averaged pressure, prove accurate at points well inland but are, in general, inadequate within a few hundred kilometers of the coast.

  17. Assessing the system value of optimal load shifting

    DOE PAGES

    Merrick, James; Ye, Yinyu; Entriken, Bob

    2017-04-30

    We analyze a competitive electricity market, where consumers exhibit optimal load shifting behavior to maximize utility and producers/suppliers maximize their profit under supply capacity constraints. The associated computationally tractable formulation can be used to inform market design or policy analysis in the context of increasing availability of the smart grid technologies that enable optimal load shifting. Through analytic and numeric assessment of the model, we assess the equilibrium value of optimal electricity load shifting, including how the value changes as more electricity consumers adopt associated technologies. For our illustrative numerical case, derived from the Current Trends scenario of the ERCOTmore » Long Term System Assessment, the average energy arbitrage value per ERCOT customer of optimal load shifting technologies is estimated to be $3 for the 2031 scenario year. We assess the sensitivity of this result to the flexibility of load, along with its relationship to the deployment of renewables. Finally, the model presented can also be a starting point for designing system operation infrastructure that communicates with the devices that schedule loads in response to price signals.« less

  18. Assessing the system value of optimal load shifting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Merrick, James; Ye, Yinyu; Entriken, Bob

    We analyze a competitive electricity market, where consumers exhibit optimal load shifting behavior to maximize utility and producers/suppliers maximize their profit under supply capacity constraints. The associated computationally tractable formulation can be used to inform market design or policy analysis in the context of increasing availability of the smart grid technologies that enable optimal load shifting. Through analytic and numeric assessment of the model, we assess the equilibrium value of optimal electricity load shifting, including how the value changes as more electricity consumers adopt associated technologies. For our illustrative numerical case, derived from the Current Trends scenario of the ERCOTmore » Long Term System Assessment, the average energy arbitrage value per ERCOT customer of optimal load shifting technologies is estimated to be $3 for the 2031 scenario year. We assess the sensitivity of this result to the flexibility of load, along with its relationship to the deployment of renewables. Finally, the model presented can also be a starting point for designing system operation infrastructure that communicates with the devices that schedule loads in response to price signals.« less

  19. In vitro analysis of post-fatigue reverse-torque values at the dental abutment/implant interface for a unitarian abutment design.

    PubMed

    Cashman, Paul M; Schneider, Robert L; Schneider, Galen B; Stanford, Clark M; Clancy, James M; Qian, Fang

    2011-10-01

    This study analyzed baseline and post-fatigue reverse-torque values (RTVs) for a specific brand control abutment relative to a third party compatible abutment. The purpose of this study was to compare the abutments' fatigue resistance to simulated function, using RTVs as an indication of residual preload at the implant/abutment interface. Forty Straumann tissue-level implants were mounted in resin and divided into four groups (n = 10). Forty abutments were seated, 20 control and 20 third-party abutments, according to manufacturer guidelines. Ten abutments from each manufacturer were evaluated for RTV without fatigue loading, using a calibrated digital torque gauge to provide a baseline RTVs. Fatigue loading was carried out on the remaining ten specimens from each manufacturer according to ISO 14801 guidelines. A moving-magnet linear motor was used to load one specimen per sequence, alternating from 10 to 200 N at 15 Hz for 5×10(6) cycles. RTV was recorded post-fatigue loading. The results were subjected to two-sample t-testing and two-way ANOVA. Scanning electron microphotography was carried out on three specimens from both manufacturers at baseline and post-fatigue cycling to visualize thread geometry and the abutment/implant interface. The data indicated that mean post-fatigue RTV observed for the control group was significantly higher than the third-party group (RTV 42.65 ± 6.70 N vs. 36.25 ± 2.63 N, p= 0.0161). Visual differences at the macro/microscopic level were also apparent for thread geometry, with third-party abutments demonstrating considerably greater variation in geometrical architecture than control specimens. Within the limitations of this in vitro model, the effect of component manufacturer resulted in a significantly higher RTV in the control group (two-way ANOVA, p= 0.0032) indicating greater residual preload; however, there was no significant decrease in post-fatigue RTV for either manufacturer compared to baseline. © 2011 by The American College of Prosthodontists.

  20. Cost Minimization for Joint Energy Management and Production Scheduling Using Particle Swarm Optimization

    NASA Astrophysics Data System (ADS)

    Shah, Rahul H.

    Production costs account for the largest share of the overall cost of manufacturing facilities. With the U.S. industrial sector becoming more and more competitive, manufacturers are looking for more cost and resource efficient working practices. Operations management and production planning have shown their capability to dramatically reduce manufacturing costs and increase system robustness. When implementing operations related decision making and planning, two fields that have shown to be most effective are maintenance and energy. Unfortunately, the current research that integrates both is limited. Additionally, these studies fail to consider parameter domains and optimization on joint energy and maintenance driven production planning. Accordingly, production planning methodology that considers maintenance and energy is investigated. Two models are presented to achieve well-rounded operating strategy. The first is a joint energy and maintenance production scheduling model. The second is a cost per part model considering maintenance, energy, and production. The proposed methodology will involve a Time-of-Use electricity demand response program, buffer and holding capacity, station reliability, production rate, station rated power, and more. In practice, the scheduling problem can be used to determine a joint energy, maintenance, and production schedule. Meanwhile, the cost per part model can be used to: (1) test the sensitivity of the obtained optimal production schedule and its corresponding savings by varying key production system parameters; and (2) to determine optimal system parameter combinations when using the joint energy, maintenance, and production planning model. Additionally, a factor analysis on the system parameters is conducted and the corresponding performance of the production schedule under variable parameter conditions, is evaluated. Also, parameter optimization guidelines that incorporate maintenance and energy parameter decision making in the production planning framework are discussed. A modified Particle Swarm Optimization solution technique is adopted to solve the proposed scheduling problem. The algorithm is described in detail and compared to Genetic Algorithm. Case studies are presented to illustrate the benefits of using the proposed model and the effectiveness of the Particle Swarm Optimization approach. Numerical Experiments are implemented and analyzed to test the effectiveness of the proposed model. The proposed scheduling strategy can achieve savings of around 19 to 27 % in cost per part when compared to the baseline scheduling scenarios. By optimizing key production system parameters from the cost per part model, the baseline scenarios can obtain around 20 to 35 % in savings for the cost per part. These savings further increase by 42 to 55 % when system parameter optimization is integrated with the proposed scheduling problem. Using this method, the most influential parameters on the cost per part are the rated power from production, the production rate, and the initial machine reliabilities. The modified Particle Swarm Optimization algorithm adopted allows greater diversity and exploration compared to Genetic Algorithm for the proposed joint model which results in it being more computationally efficient in determining the optimal scheduling. While Genetic Algorithm could achieve a solution quality of 2,279.63 at an expense of 2,300 seconds in computational effort. In comparison, the proposed Particle Swarm Optimization algorithm achieved a solution quality of 2,167.26 in less than half the computation effort which is required by Genetic Algorithm.

Top