Sample records for basis set contraction

  1. Parallel Douglas-Kroll Energy and Gradients in NWChem. Estimating Scalar Relativistic Effects Using Douglas-Kroll Contracted Basis Sets.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    De Jong, Wibe A.; Harrison, Robert J.; Dixon, David A.

    A parallel implementation of the spin-free one-electron Douglas-Kroll(-Hess) Hamiltonian (DKH) in NWChem is discussed. An efficient and accurate method to calculate DKH gradients is introduced. It is shown that the use of standard (non-relativistic) contracted basis set can produce erroneous results for elements beyond the first row elements. The generation of DKH contracted cc-pVXZ (X = D, T, Q, 5) basis sets for H, He, B - Ne, Al - Ar, and Ga - Br will be discussed.

  2. Core-core and core-valence correlation

    NASA Technical Reports Server (NTRS)

    Bauschlicher, Charles W., Jr.; Langhoff, Stephen R.; Taylor, Peter R.

    1988-01-01

    The effect of (1s) core correlation on properties and energy separations was analyzed using full configuration-interaction (FCI) calculations. The Be 1 S - 1 P, the C 3 P - 5 S and CH+ 1 Sigma + or - 1 Pi separations, and CH+ spectroscopic constants, dipole moment and 1 Sigma + - 1 Pi transition dipole moment were studied. The results of the FCI calculations are compared to those obtained using approximate methods. In addition, the generation of atomic natural orbital (ANO) basis sets, as a method for contracting a primitive basis set for both valence and core correlation, is discussed. When both core-core and core-valence correlation are included in the calculation, no suitable truncated CI approach consistently reproduces the FCI, and contraction of the basis set is very difficult. If the (nearly constant) core-core correlation is eliminated, and only the core-valence correlation is included, CASSCF/MRCI approached reproduce the FCI results and basis set contraction is significantly easier.

  3. Atomic Cholesky decompositions: a route to unbiased auxiliary basis sets for density fitting approximation with tunable accuracy and efficiency.

    PubMed

    Aquilante, Francesco; Gagliardi, Laura; Pedersen, Thomas Bondo; Lindh, Roland

    2009-04-21

    Cholesky decomposition of the atomic two-electron integral matrix has recently been proposed as a procedure for automated generation of auxiliary basis sets for the density fitting approximation [F. Aquilante et al., J. Chem. Phys. 127, 114107 (2007)]. In order to increase computational performance while maintaining accuracy, we propose here to reduce the number of primitive Gaussian functions of the contracted auxiliary basis functions by means of a second Cholesky decomposition. Test calculations show that this procedure is most beneficial in conjunction with highly contracted atomic orbital basis sets such as atomic natural orbitals, and that the error resulting from the second decomposition is negligible. We also demonstrate theoretically as well as computationally that the locality of the fitting coefficients can be controlled by means of the decomposition threshold even with the long-ranged Coulomb metric. Cholesky decomposition-based auxiliary basis sets are thus ideally suited for local density fitting approximations.

  4. Atomic Cholesky decompositions: A route to unbiased auxiliary basis sets for density fitting approximation with tunable accuracy and efficiency

    NASA Astrophysics Data System (ADS)

    Aquilante, Francesco; Gagliardi, Laura; Pedersen, Thomas Bondo; Lindh, Roland

    2009-04-01

    Cholesky decomposition of the atomic two-electron integral matrix has recently been proposed as a procedure for automated generation of auxiliary basis sets for the density fitting approximation [F. Aquilante et al., J. Chem. Phys. 127, 114107 (2007)]. In order to increase computational performance while maintaining accuracy, we propose here to reduce the number of primitive Gaussian functions of the contracted auxiliary basis functions by means of a second Cholesky decomposition. Test calculations show that this procedure is most beneficial in conjunction with highly contracted atomic orbital basis sets such as atomic natural orbitals, and that the error resulting from the second decomposition is negligible. We also demonstrate theoretically as well as computationally that the locality of the fitting coefficients can be controlled by means of the decomposition threshold even with the long-ranged Coulomb metric. Cholesky decomposition-based auxiliary basis sets are thus ideally suited for local density fitting approximations.

  5. Daubechies wavelets for linear scaling density functional theory.

    PubMed

    Mohr, Stephan; Ratcliff, Laura E; Boulanger, Paul; Genovese, Luigi; Caliste, Damien; Deutsch, Thierry; Goedecker, Stefan

    2014-05-28

    We demonstrate that Daubechies wavelets can be used to construct a minimal set of optimized localized adaptively contracted basis functions in which the Kohn-Sham orbitals can be represented with an arbitrarily high, controllable precision. Ground state energies and the forces acting on the ions can be calculated in this basis with the same accuracy as if they were calculated directly in a Daubechies wavelets basis, provided that the amplitude of these adaptively contracted basis functions is sufficiently small on the surface of the localization region, which is guaranteed by the optimization procedure described in this work. This approach reduces the computational costs of density functional theory calculations, and can be combined with sparse matrix algebra to obtain linear scaling with respect to the number of electrons in the system. Calculations on systems of 10,000 atoms or more thus become feasible in a systematic basis set with moderate computational resources. Further computational savings can be achieved by exploiting the similarity of the adaptively contracted basis functions for closely related environments, e.g., in geometry optimizations or combined calculations of neutral and charged systems.

  6. 48 CFR 19.502-2 - Total small business set-asides.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... purchases on an unrestricted basis, the contracting officer shall include in the contract file the reason for this unrestricted purchase. If the contracting officer receives only one acceptable offer from a... important, it is not the only factor to be considered in determining whether a reasonable expectation exists...

  7. Optimized auxiliary basis sets for density fitted post-Hartree-Fock calculations of lanthanide containing molecules

    NASA Astrophysics Data System (ADS)

    Chmela, Jiří; Harding, Michael E.

    2018-06-01

    Optimised auxiliary basis sets for lanthanide atoms (Ce to Lu) for four basis sets of the Karlsruhe error-balanced segmented contracted def2 - series (SVP, TZVP, TZVPP and QZVPP) are reported. These auxiliary basis sets enable the use of the resolution-of-the-identity (RI) approximation in post Hartree-Fock methods - as for example, second-order perturbation theory (MP2) and coupled cluster (CC) theory. The auxiliary basis sets are tested on an enlarged set of about a hundred molecules where the test criterion is the size of the RI error in MP2 calculations. Our tests also show that the same auxiliary basis sets can be used together with different effective core potentials. With these auxiliary basis set calculations of MP2 and CC quality can now be performed efficiently on medium-sized molecules containing lanthanides.

  8. 48 CFR 25.504-4 - Group award basis.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Group award basis. 25.504... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Evaluating Foreign Offers-Supply Contracts 25.504-4 Group award basis... a group basis. Assume the Buy American Act applies and the acquisition cannot be set aside for small...

  9. 48 CFR 25.504-4 - Group award basis.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Group award basis. 25.504... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Evaluating Foreign Offers-Supply Contracts 25.504-4 Group award basis... a group basis. Assume the Buy American Act applies and the acquisition cannot be set aside for small...

  10. 48 CFR 25.504-4 - Group award basis.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Group award basis. 25.504... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Evaluating Foreign Offers-Supply Contracts 25.504-4 Group award basis... a group basis. Assume the Buy American statute applies and the acquisition cannot be set aside for...

  11. 48 CFR 25.504-4 - Group award basis.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Group award basis. 25.504... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Evaluating Foreign Offers-Supply Contracts 25.504-4 Group award basis... a group basis. Assume the Buy American Act applies and the acquisition cannot be set aside for small...

  12. 48 CFR 25.504-4 - Group award basis.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Group award basis. 25.504... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Evaluating Foreign Offers-Supply Contracts 25.504-4 Group award basis... a group basis. Assume the Buy American Act applies and the acquisition cannot be set aside for small...

  13. Coupled-cluster based basis sets for valence correlation calculations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Claudino, Daniel; Bartlett, Rodney J., E-mail: bartlett@qtp.ufl.edu; Gargano, Ricardo

    Novel basis sets are generated that target the description of valence correlation in atoms H through Ar. The new contraction coefficients are obtained according to the Atomic Natural Orbital (ANO) procedure from CCSD(T) (coupled-cluster singles and doubles with perturbative triples correction) density matrices starting from the primitive functions of Dunning et al. [J. Chem. Phys. 90, 1007 (1989); ibid. 98, 1358 (1993); ibid. 100, 2975 (1993)] (correlation consistent polarized valence X-tuple zeta, cc-pVXZ). The exponents of the primitive Gaussian functions are subject to uniform scaling in order to ensure satisfaction of the virial theorem for the corresponding atoms. These newmore » sets, named ANO-VT-XZ (Atomic Natural Orbital Virial Theorem X-tuple Zeta), have the same number of contracted functions as their cc-pVXZ counterparts in each subshell. The performance of these basis sets is assessed by the evaluation of the contraction errors in four distinct computations: correlation energies in atoms, probing the density in different regions of space via 〈r{sup n}〉 (−3 ≤ n ≤ 3) in atoms, correlation energies in diatomic molecules, and the quality of fitting potential energy curves as measured by spectroscopic constants. All energy calculations with ANO-VT-QZ have contraction errors within “chemical accuracy” of 1 kcal/mol, which is not true for cc-pVQZ, suggesting some improvement compared to the correlation consistent series of Dunning and co-workers.« less

  14. 48 CFR 19.502-2 - Total small business set-asides.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Total small business set... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Set-Asides for Small Business 19.502-2 Total small business set... contracting officer does not proceed with the small business set-aside and purchases on an unrestricted basis...

  15. 48 CFR 19.502-2 - Total small business set-asides.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Total small business set... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Set-Asides for Small Business 19.502-2 Total small business set... contracting officer does not proceed with the small business set-aside and purchases on an unrestricted basis...

  16. 48 CFR 19.502-2 - Total small business set-asides.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Total small business set... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Set-Asides for Small Business 19.502-2 Total small business set... contracting officer does not proceed with the small business set-aside and purchases on an unrestricted basis...

  17. 48 CFR 19.203 - Relationship among small business programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... not proceed with a small business set-aside and purchases on an unrestricted basis, the contracting... agrees to its release in accordance with 13 CFR parts 124, 125 and 126. (d) Small business set-asides have priority over acquisitions using full and open competition. See requirements for establishing a...

  18. Some considerations about Gaussian basis sets for electric property calculations

    NASA Astrophysics Data System (ADS)

    Arruda, Priscilla M.; Canal Neto, A.; Jorge, F. E.

    Recently, segmented contracted basis sets of double, triple, and quadruple zeta valence quality plus polarization functions (XZP, X = D, T, and Q, respectively) for the atoms from H to Ar were reported. In this work, with the objective of having a better description of polarizabilities, the QZP set was augmented with diffuse (s and p symmetries) and polarization (p, d, f, and g symmetries) functions that were chosen to maximize the mean dipole polarizability at the UHF and UMP2 levels, respectively. At the HF and B3LYP levels of theory, electric dipole moment and static polarizability for a sample of molecules were evaluated. Comparison with experimental data and results obtained with a similar size basis set, whose diffuse functions were optimized for the ground state energy of the anion, was done.

  19. Detailed Wave Function Analysis for Multireference Methods: Implementation in the Molcas Program Package and Applications to Tetracene.

    PubMed

    Plasser, Felix; Mewes, Stefanie A; Dreuw, Andreas; González, Leticia

    2017-11-14

    High-level multireference computations on electronically excited and charged states of tetracene are performed, and the results are analyzed using an extensive wave function analysis toolbox that has been newly implemented in the Molcas program package. Aside from verifying the strong effect of dynamic correlation, this study reveals an unexpected critical influence of the atomic orbital basis set. It is shown that different polarized double-ζ basis sets produce significantly different results for energies, densities, and overall wave functions, with the best performance obtained for the atomic natural orbital (ANO) basis set by Pierloot et al. Strikingly, the ANO basis set not only reproduces the energies but also performs exceptionally well in terms of describing the diffuseness of the different states and of their attachment/detachment densities. This study, thus, not only underlines the fact that diffuse basis functions are needed for an accurate description of the electronic wave functions but also shows that, at least for the present example, it is enough to include them implicitly in the contraction scheme.

  20. Accompanying coordinate expansion and recurrence relation method using a transfer relation scheme for electron repulsion integrals with high angular momenta and long contractions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hayami, Masao; Seino, Junji; Nakai, Hiromi, E-mail: nakai@waseda.jp

    An efficient algorithm for the rapid evaluation of electron repulsion integrals is proposed. The present method, denoted by accompanying coordinate expansion and transferred recurrence relation (ACE-TRR), is constructed using a transfer relation scheme based on the accompanying coordinate expansion and recurrence relation method. Furthermore, the ACE-TRR algorithm is extended for the general-contraction basis sets. Numerical assessments clarify the efficiency of the ACE-TRR method for the systems including heavy elements, whose orbitals have long contractions and high angular momenta, such as f- and g-orbitals.

  1. Contracted or uncontracted polarization functions? Comment on Dunning's correlation-consistent basis sets

    NASA Astrophysics Data System (ADS)

    Hashimoto, Tomohiro; Hirao, Kimihiko; Tatewaki, Hiroshi

    1997-07-01

    For the sake of computational economy, the polarization functions given by Dunning are contracted by multiconfigurational SCF calculations for H, B, C, N, O, F and Ne atoms. For the first-row atoms, B through Ne, the generated contracted polarization functions are ( 2 d/1 d) and ( 3 d/2 d) and for H they are ( 2 p/1 p), ( 3 p/1 p), and ( 3 p/2 p) where the numbers before and after the slash are the numbers of uncontracted and contracted polarization functions. Numerical examples on some diatomic molecules and benzene illustrate a large improvement in going from ( 1 d/1 dto ( 2 d/1 d) for various molecular properties.

  2. A New Potential Energy Surface for N+O2: Is There an NOO Minimum?

    NASA Technical Reports Server (NTRS)

    Walch, Stephen P.

    1995-01-01

    We report a new calculation of the N+02 potential energy surface using complete active space self-consistent field internally contracted configuration interaction with the Dunning correlation consistent basis sets. The peroxy isomer of N02 is found to be a very shallow minimum separated from NO+O by a barrier of only 0.3 kcal/mol (excluding zero-point effects). The entrance channel barrier height is estimated to be 8.6 kcal/mol for ICCI+Q calculations correlating all but the Ols and N1s electrons with a cc-p VQZ basis set.

  3. General contraction of Gaussian basis sets. II - Atomic natural orbitals and the calculation of atomic and molecular properties

    NASA Technical Reports Server (NTRS)

    Almlof, Jan; Taylor, Peter R.

    1990-01-01

    A recently proposed scheme for using natural orbitals from atomic configuration interaction wave functions as a basis set for linear combination of atomic orbitals (LCAO) calculations is extended for the calculation of molecular properties. For one-electron properties like multipole moments, which are determined largely by the outermost regions of the molecular wave function, it is necessary to increase the flexibility of the basis in these regions. This is most easily done by uncontracting the outermost Gaussian primitives, and/or by adding diffuse primitives. A similar approach can be employed for the calculation of polarizabilities. Properties which are not dominated by the long-range part of the wave function, such as spectroscopic constants or electric field gradients at the nucleus, can generally be treated satisfactorily with the original atomic natural orbital sets.

  4. General contraction of Gaussian basis sets. Part 2: Atomic natural orbitals and the calculation of atomic and molecular properties

    NASA Technical Reports Server (NTRS)

    Almloef, Jan; Taylor, Peter R.

    1989-01-01

    A recently proposed scheme for using natural orbitals from atomic configuration interaction (CI) wave functions as a basis set for linear combination of atomic orbitals (LCAO) calculations is extended for the calculation of molecular properties. For one-electron properties like multipole moments, which are determined largely by the outermost regions of the molecular wave function, it is necessary to increase the flexibility of the basis in these regions. This is most easily done by uncontracting the outmost Gaussian primitives, and/or by adding diffuse primitives. A similar approach can be employed for the calculation of polarizabilities. Properties which are not dominated by the long-range part of the wave function, such as spectroscopic constants or electric field gradients at the nucleus, can generally be treated satisfactorily with the original atomic natural orbital (ANO) sets.

  5. Gaussian basis sets for use in correlated molecular calculations. XI. Pseudopotential-based and all-electron relativistic basis sets for alkali metal (K-Fr) and alkaline earth (Ca-Ra) elements

    NASA Astrophysics Data System (ADS)

    Hill, J. Grant; Peterson, Kirk A.

    2017-12-01

    New correlation consistent basis sets based on pseudopotential (PP) Hamiltonians have been developed from double- to quintuple-zeta quality for the late alkali (K-Fr) and alkaline earth (Ca-Ra) metals. These are accompanied by new all-electron basis sets of double- to quadruple-zeta quality that have been contracted for use with both Douglas-Kroll-Hess (DKH) and eXact 2-Component (X2C) scalar relativistic Hamiltonians. Sets for valence correlation (ms), cc-pVnZ-PP and cc-pVnZ-(DK,DK3/X2C), in addition to outer-core correlation [valence + (m-1)sp], cc-p(w)CVnZ-PP and cc-pwCVnZ-(DK,DK3/X2C), are reported. The -PP sets have been developed for use with small-core PPs [I. S. Lim et al., J. Chem. Phys. 122, 104103 (2005) and I. S. Lim et al., J. Chem. Phys. 124, 034107 (2006)], while the all-electron sets utilized second-order DKH Hamiltonians for 4s and 5s elements and third-order DKH for 6s and 7s. The accuracy of the basis sets is assessed through benchmark calculations at the coupled-cluster level of theory for both atomic and molecular properties. Not surprisingly, it is found that outer-core correlation is vital for accurate calculation of the thermodynamic and spectroscopic properties of diatomic molecules containing these elements.

  6. Fragment approach to constrained density functional theory calculations using Daubechies wavelets

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ratcliff, Laura E.; Genovese, Luigi; Mohr, Stephan

    2015-06-21

    In a recent paper, we presented a linear scaling Kohn-Sham density functional theory (DFT) code based on Daubechies wavelets, where a minimal set of localized support functions are optimized in situ and therefore adapted to the chemical properties of the molecular system. Thanks to the systematically controllable accuracy of the underlying basis set, this approach is able to provide an optimal contracted basis for a given system: accuracies for ground state energies and atomic forces are of the same quality as an uncontracted, cubic scaling approach. This basis set offers, by construction, a natural subset where the density matrix ofmore » the system can be projected. In this paper, we demonstrate the flexibility of this minimal basis formalism in providing a basis set that can be reused as-is, i.e., without reoptimization, for charge-constrained DFT calculations within a fragment approach. Support functions, represented in the underlying wavelet grid, of the template fragments are roto-translated with high numerical precision to the required positions and used as projectors for the charge weight function. We demonstrate the interest of this approach to express highly precise and efficient calculations for preparing diabatic states and for the computational setup of systems in complex environments.« less

  7. Using monomer vibrational wavefunctions as contracted basis functions to compute rovibrational levels of an H2O-atom complex in full dimensionality.

    PubMed

    Wang, Xiao-Gang; Carrington, Tucker

    2017-03-14

    In this paper, we present new ideas for computing rovibrational energy levels of molecules composed of two components and apply them to H 2 O-Cl - . When both components are themselves molecules, Euler angles that specify their orientation with respect to an axis system attached to the inter-monomer vector are used as vibrational coordinates. For H 2 O-Cl - , there is only one set of Euler angles. Using Euler angles as intermolecular vibrational coordinates is advantageous because in many cases coupling between them and coordinates that describe the shape of the monomers is unimportant. The monomers are not assumed to be rigid. In the most efficient calculation, vibrational wavefunctions of the monomers are used as contracted basis functions. Energy levels are calculated using the Lanczos algorithm.

  8. Using monomer vibrational wavefunctions as contracted basis functions to compute rovibrational levels of an H2O-atom complex in full dimensionality

    NASA Astrophysics Data System (ADS)

    Wang, Xiao-Gang; Carrington, Tucker

    2017-03-01

    In this paper, we present new ideas for computing rovibrational energy levels of molecules composed of two components and apply them to H2O-Cl-. When both components are themselves molecules, Euler angles that specify their orientation with respect to an axis system attached to the inter-monomer vector are used as vibrational coordinates. For H2O-Cl-, there is only one set of Euler angles. Using Euler angles as intermolecular vibrational coordinates is advantageous because in many cases coupling between them and coordinates that describe the shape of the monomers is unimportant. The monomers are not assumed to be rigid. In the most efficient calculation, vibrational wavefunctions of the monomers are used as contracted basis functions. Energy levels are calculated using the Lanczos algorithm.

  9. Assessment of multireference approaches to explicitly correlated full configuration interaction quantum Monte Carlo

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kersten, J. A. F., E-mail: jennifer.kersten@cantab.net; Alavi, Ali, E-mail: a.alavi@fkf.mpg.de; Max Planck Institute for Solid State Research, Heisenbergstraße 1, 70569 Stuttgart

    2016-08-07

    The Full Configuration Interaction Quantum Monte Carlo (FCIQMC) method has proved able to provide near-exact solutions to the electronic Schrödinger equation within a finite orbital basis set, without relying on an expansion about a reference state. However, a drawback to the approach is that being based on an expansion of Slater determinants, the FCIQMC method suffers from a basis set incompleteness error that decays very slowly with the size of the employed single particle basis. The FCIQMC results obtained in a small basis set can be improved significantly with explicitly correlated techniques. Here, we present a study that assesses andmore » compares two contrasting “universal” explicitly correlated approaches that fit into the FCIQMC framework: the [2]{sub R12} method of Kong and Valeev [J. Chem. Phys. 135, 214105 (2011)] and the explicitly correlated canonical transcorrelation approach of Yanai and Shiozaki [J. Chem. Phys. 136, 084107 (2012)]. The former is an a posteriori internally contracted perturbative approach, while the latter transforms the Hamiltonian prior to the FCIQMC simulation. These comparisons are made across the 55 molecules of the G1 standard set. We found that both methods consistently reduce the basis set incompleteness, for accurate atomization energies in small basis sets, reducing the error from 28 mE{sub h} to 3-4 mE{sub h}. While many of the conclusions hold in general for any combination of multireference approaches with these methodologies, we also consider FCIQMC-specific advantages of each approach.« less

  10. Mutuality and reciprocity in the psychological contracts of employees and employers.

    PubMed

    Dabos, Guillermo E; Rousseau, Denise M

    2004-02-01

    The authors assessed the joint perceptions of the employee and his or her employer to examine mutuality and reciprocity in the employment relationship. Paired psychological contract reports were obtained from 80 employee-employer dyads in 16 university-based research centers. On the basis of in-depth study of the research setting, research directors were identified as primary agents for the university (employer) in shaping the terms of employment of staff scientists (employees). By assessing the extent of consistency between employee and employer beliefs regarding their exchange agreement, the present study mapped the variation and consequences of mutuality and reciprocity in psychological contracts. Results indicate that both mutuality and reciprocity are positively related to archival indicators of research productivity and career advancement, in addition to self-reported measures of Met Expectations and intention to continue working with the employer. Implications for psychological contract theory are presented. ((c) 2004 APA, all rights reserved)

  11. Density functional theory calculations of the lowest energy quintet and triplet states of model hemes: role of functional, basis set, and zero-point energy corrections.

    PubMed

    Khvostichenko, Daria; Choi, Andrew; Boulatov, Roman

    2008-04-24

    We investigated the effect of several computational variables, including the choice of the basis set, application of symmetry constraints, and zero-point energy (ZPE) corrections, on the structural parameters and predicted ground electronic state of model 5-coordinate hemes (iron(II) porphines axially coordinated by a single imidazole or 2-methylimidazole). We studied the performance of B3LYP and B3PW91 with eight Pople-style basis sets (up to 6-311+G*) and B97-1, OLYP, and TPSS functionals with 6-31G and 6-31G* basis sets. Only hybrid functionals B3LYP, B3PW91, and B97-1 reproduced the quintet ground state of the model hemes. With a given functional, the choice of the basis set caused up to 2.7 kcal/mol variation of the quintet-triplet electronic energy gap (DeltaEel), in several cases, resulting in the inversion of the sign of DeltaEel. Single-point energy calculations with triple-zeta basis sets of the Pople (up to 6-311G++(2d,2p)), Ahlrichs (TZVP and TZVPP), and Dunning (cc-pVTZ) families showed the same trend. The zero-point energy of the quintet state was approximately 1 kcal/mol lower than that of the triplet, and accounting for ZPE corrections was crucial for establishing the ground state if the electronic energy of the triplet state was approximately 1 kcal/mol less than that of the quintet. Within a given model chemistry, effects of symmetry constraints and of a "tense" structure of the iron porphine fragment coordinated to 2-methylimidazole on DeltaEel were limited to 0.3 kcal/mol. For both model hemes the best agreement with crystallographic structural data was achieved with small 6-31G and 6-31G* basis sets. Deviation of the computed frequency of the Fe-Im stretching mode from the experimental value with the basis set decreased in the order: nonaugmented basis sets, basis sets with polarization functions, and basis sets with polarization and diffuse functions. Contraction of Pople-style basis sets (double-zeta or triple-zeta) affected the results insignificantly for iron(II) porphyrin coordinated with imidazole. Poor performance of a "locally dense" basis set with a large number of basis functions on the Fe center was observed in calculation of quintet-triplet gaps. Our results lead to a series of suggestions for density functional theory calculations of quintet-triplet energy gaps in ferrohemes with a single axial imidazole; these suggestions are potentially applicable for other transition-metal complexes.

  12. Accurate Gaussian basis sets for atomic and molecular calculations obtained from the generator coordinate method with polynomial discretization.

    PubMed

    Celeste, Ricardo; Maringolo, Milena P; Comar, Moacyr; Viana, Rommel B; Guimarães, Amanda R; Haiduke, Roberto L A; da Silva, Albérico B F

    2015-10-01

    Accurate Gaussian basis sets for atoms from H to Ba were obtained by means of the generator coordinate Hartree-Fock (GCHF) method based on a polynomial expansion to discretize the Griffin-Wheeler-Hartree-Fock equations (GWHF). The discretization of the GWHF equations in this procedure is based on a mesh of points not equally distributed in contrast with the original GCHF method. The results of atomic Hartree-Fock energies demonstrate the capability of these polynomial expansions in designing compact and accurate basis sets to be used in molecular calculations and the maximum error found when compared to numerical values is only 0.788 mHartree for indium. Some test calculations with the B3LYP exchange-correlation functional for N2, F2, CO, NO, HF, and HCN show that total energies within 1.0 to 2.4 mHartree compared to the cc-pV5Z basis sets are attained with our contracted bases with a much smaller number of polarization functions (2p1d and 2d1f for hydrogen and heavier atoms, respectively). Other molecular calculations performed here are also in very good accordance with experimental and cc-pV5Z results. The most important point to be mentioned here is that our generator coordinate basis sets required only a tiny fraction of the computational time when compared to B3LYP/cc-pV5Z calculations.

  13. Geminal embedding scheme for optimal atomic basis set construction in correlated calculations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sorella, S., E-mail: sorella@sissa.it; Devaux, N.; Dagrada, M., E-mail: mario.dagrada@impmc.upmc.fr

    2015-12-28

    We introduce an efficient method to construct optimal and system adaptive basis sets for use in electronic structure and quantum Monte Carlo calculations. The method is based on an embedding scheme in which a reference atom is singled out from its environment, while the entire system (atom and environment) is described by a Slater determinant or its antisymmetrized geminal power (AGP) extension. The embedding procedure described here allows for the systematic and consistent contraction of the primitive basis set into geminal embedded orbitals (GEOs), with a dramatic reduction of the number of variational parameters necessary to represent the many-body wavemore » function, for a chosen target accuracy. Within the variational Monte Carlo method, the Slater or AGP part is determined by a variational minimization of the energy of the whole system in presence of a flexible and accurate Jastrow factor, representing most of the dynamical electronic correlation. The resulting GEO basis set opens the way for a fully controlled optimization of many-body wave functions in electronic structure calculation of bulk materials, namely, containing a large number of electrons and atoms. We present applications on the water molecule, the volume collapse transition in cerium, and the high-pressure liquid hydrogen.« less

  14. The molecular gradient using the divide-expand-consolidate resolution of the identity second-order Møller-Plesset perturbation theory: The DEC-RI-MP2 gradient

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bykov, Dmytro; Kristensen, Kasper; Kjærgaard, Thomas

    We report an implementation of the molecular gradient using the divide-expand-consolidate resolution of the identity second-order Møller-Plesset perturbation theory (DEC-RI-MP2). The new DEC-RI-MP2 gradient method combines the precision control as well as the linear-scaling and massively parallel features of the DEC scheme with efficient evaluations of the gradient contributions using the RI approximation. We further demonstrate that the DEC-RI-MP2 gradient method is capable of calculating molecular gradients for very large molecular systems. A test set of supramolecular complexes containing up to 158 atoms and 1960 contracted basis functions has been employed to demonstrate the general applicability of the DEC-RI-MP2 methodmore » and to analyze the errors of the DEC approximation. Moreover, the test set contains molecules of complicated electronic structures and is thus deliberately chosen to stress test the DEC-RI-MP2 gradient implementation. Additionally, as a showcase example the full molecular gradient for insulin (787 atoms and 7604 contracted basis functions) has been evaluated.« less

  15. Strategies and Lessons-Learned for the Successful Alignment of Contract Cost with the Contract Budget Base (CBB) within the First Year of Contract Award - 13154

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mullis, Jay; Rueter, Ken

    2013-07-01

    In order to provide a sound basis and foundation for integrated Project and Contract change management, it is imperative to ensure the alignment of the Negotiated Contract Costs (NCC) with the Contract Budget Base (CBB), where CBB is defined as the Performance Measurement Baseline (PMB) plus Management Reserve (MR). The achievement of this alignment assures customer and contractor agreement on scope, requirements, quantities, schedule and cost, which facilitates the identification of change conditions and ultimate agreement on the value of changes to the NCC and the CBB. Delays in contract/CBB true up/reconciliation can negatively effect measurement of project progress, limitingmore » owner understanding of liability, and may result in increased contract disagreements and potential claims. The Department of Energy Oak Ridge Office of Environmental Management (OR-EM) and URS - CH2M Oak Ridge LLC (UCOR) achieved alignment of the NCC with the CBB within 10 months of UCOR taking over work on the East Tennessee Technology Park (ETTP) cleanup contract by: 1. Managing as a discrete project; 2. Establishing expectations and setting tone of interactions; 3. Using personnel experienced with Federal Acquisition Regulation (FAR); 4. Partnering; 5. Establishing ombudsmen. (authors)« less

  16. An ab initio benchmark study of the H + CO --> HCO reaction

    NASA Technical Reports Server (NTRS)

    Woon, D. E.

    1996-01-01

    The H + CO --> HCO reaction has been characterized with correlation consistent basis sets at five levels of theory in order to benchmark the sensitivities of the barrier height and reaction ergicity to the one-electron and n-electron expansions of the electronic wave function. Single and multireference methods are compared and contrasted. The coupled cluster method RCCSD(T) was found to be in very good agreement with Davidson-corrected internally-contracted multireference configuration interaction (MRCI+Q). Second-order Moller-Plesset perturbation theory (MP2) was also employed. The estimated complete basis set (CBS) limits for the barrier height (in kcal/mol) for the five methods, including harmonic zero-point energy corrections, are MP2, 4.66; RCCSD, 4.78; RCCSD(T), 4.15; MRCI, 5.10; and MRCI+Q, 4.07. Similarly, the estimated CBS limits for the ergicity of the reaction are: MP2, -17.99; RCCSD, -13.34; RCCSD(T), -13.79; MRCI, -11.46; and MRCI+Q, -13.70. Additional basis set explorations for the RCCSD(T) method demonstrate that aug-cc-pVTZ sets, even with some functions removed, are sufficient to reproduce the CBS limits to within 0.1-0.3 kcal/mol.

  17. 26 CFR 1.734-1 - Optional adjustment to basis of undistributed partnership property.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... a long-term contract accounted for under a long-term contract method of accounting. The provisions... allocated. (e) Recovery of adjustments to basis of partnership property—(1) Increases in basis. For purposes of section 168, if the basis of a partnership's recovery property is increased as a result of the...

  18. 26 CFR 1.734-1 - Optional adjustment to basis of undistributed partnership property.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... a long-term contract accounted for under a long-term contract method of accounting. The provisions... allocated. (e) Recovery of adjustments to basis of partnership property—(1) Increases in basis. For purposes of section 168, if the basis of a partnership's recovery property is increased as a result of the...

  19. 26 CFR 1.734-1 - Optional adjustment to basis of undistributed partnership property.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... a long-term contract accounted for under a long-term contract method of accounting. The provisions... allocated. (e) Recovery of adjustments to basis of partnership property—(1) Increases in basis. For purposes of section 168, if the basis of a partnership's recovery property is increased as a result of the...

  20. 26 CFR 1.734-1 - Optional adjustment to basis of undistributed partnership property.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... a long-term contract accounted for under a long-term contract method of accounting. The provisions... allocated. (e) Recovery of adjustments to basis of partnership property—(1) Increases in basis. For purposes of section 168, if the basis of a partnership's recovery property is increased as a result of the...

  1. Horizontal vectorization of electron repulsion integrals.

    PubMed

    Pritchard, Benjamin P; Chow, Edmond

    2016-10-30

    We present an efficient implementation of the Obara-Saika algorithm for the computation of electron repulsion integrals that utilizes vector intrinsics to calculate several primitive integrals concurrently in a SIMD vector. Initial benchmarks display a 2-4 times speedup with AVX instructions over comparable scalar code, depending on the basis set. Speedup over scalar code is found to be sensitive to the level of contraction of the basis set, and is best for (lAlB|lClD) quartets when lD  = 0 or lB=lD=0, which makes such a vectorization scheme particularly suitable for density fitting. The basic Obara-Saika algorithm, how it is vectorized, and the performance bottlenecks are analyzed and discussed. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.

  2. Proceedings of Symposium: Toward the Development of More Comprehensive Sets of Personality Measures (Montreal, Canada, August 1973).

    ERIC Educational Resources Information Center

    Harman, Harry H., Ed.

    The symposium focused on some problems and issues in the assessment of human personality traits and was planned around a research study being conducted by Educational Testing Service under contract with ONR. The study is trying to provide a service to researchers who are working (through the use of factor analysis) toward a theoretical basis in…

  3. 42 CFR 417.400 - Basis and scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) MEDICARE PROGRAM HEALTH MAINTENANCE ORGANIZATIONS, COMPETITIVE MEDICAL PLANS, AND HEALTH CARE PREPAYMENT PLANS Qualifying Conditions for Medicare Contracts § 417.400 Basis and scope. (a) Statutory basis. The... CMPs that contract with CMS to furnish covered services to Medicare beneficiaries. (b) Scope. (1) This...

  4. 48 CFR 16.103 - Negotiating contract type.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Selecting Contract Types 16.103 Negotiating contract... basic profit motive of business enterprise, shall be used when the risk involved is minimal or can be...) Contracts on a firm fixed-price basis other than those for major systems or research and development, and (3...

  5. JPRS Report, China.

    DTIC Science & Technology

    1991-11-19

    grew 253 percent, net assets grew 87 vigorous debates among economists a few years ago, has percent, fixed assets grew 155 percent, and average been...although enterprises. they only account for 2.7 percent of all industrial enter- prises, they possess two-thirds of all fixed assess, account If we are to...large- ther fiscal problems are handled on an ad-hoc basis. A and medium-sized enterprises do not appear strong fixed base number in contracts sets taxes

  6. Theoretical investigation of gas-surface interactions

    NASA Technical Reports Server (NTRS)

    Dyall, Kenneth G.

    1990-01-01

    A Dirac-Hartree-Fock code was developed for polyatomic molecules. The program uses integrals over symmetry-adapted real spherical harmonic Gaussian basis functions generated by a modification of the MOLECULE integrals program. A single Gaussian function is used for the nuclear charge distribution, to ensure proper boundary conditions at the nuclei. The Gaussian primitive functions are chosen to satisfy the kinetic balance condition. However, contracted functions which do not necessarily satisfy this condition may be used. The Fock matrix is constructed in the scalar basis and transformed to a jj-coupled 2-spinor basis before diagonalization. The program was tested against numerical results for atoms with a Gaussian nucleus and diatomic molecules with point nuclei. The energies converge on the numerical values as the basis set size is increased. Full use of molecular symmetry (restricted to D sub 2h and subgroups) is yet to be implemented.

  7. Estimation of Δ R/ R values by benchmark study of the Mössbauer Isomer shifts for Ru, Os complexes using relativistic DFT calculations

    NASA Astrophysics Data System (ADS)

    Kaneko, Masashi; Yasuhara, Hiroki; Miyashita, Sunao; Nakashima, Satoru

    2017-11-01

    The present study applies all-electron relativistic DFT calculation with Douglas-Kroll-Hess (DKH) Hamiltonian to each ten sets of Ru and Os compounds. We perform the benchmark investigation of three density functionals (BP86, B3LYP and B2PLYP) using segmented all-electron relativistically contracted (SARC) basis set with the experimental Mössbauer isomer shifts for 99Ru and 189Os nuclides. Geometry optimizations at BP86 theory of level locate the structure in a local minimum. We calculate the contact density to the wavefunction obtained by a single point calculation. All functionals show the good linear correlation with experimental isomer shifts for both 99Ru and 189Os. Especially, B3LYP functional gives a stronger correlation compared to BP86 and B2PLYP functionals. The comparison of contact density between SARC and well-tempered basis set (WTBS) indicated that the numerical convergence of contact density cannot be obtained, but the reproducibility is less sensitive to the choice of basis set. We also estimate the values of Δ R/ R, which is an important nuclear constant, for 99Ru and 189Os nuclides by using the benchmark results. The sign of the calculated Δ R/ R values is consistent with the predicted data for 99Ru and 189Os. We obtain computationally the Δ R/ R values of 99Ru and 189Os (36.2 keV) as 2.35×10-4 and -0.20×10-4, respectively, at B3LYP level for SARC basis set.

  8. 50 CFR 260.96 - Application for fishery products inspection service on a contract basis at official establishments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INSPECTION AND CERTIFICATION Inspection and Certification of Establishments and Fishery Products for Human Consumption Requirements for Plants Operating Under Continuous Inspection on A Contract Basis 1 § 260.96...

  9. 50 CFR 260.96 - Application for fishery products inspection service on a contract basis at official establishments.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSPECTION AND CERTIFICATION Inspection and Certification of Establishments and Fishery Products for Human Consumption Requirements for Plants Operating Under Continuous Inspection on A Contract Basis 1 § 260.96...

  10. Recent advances in electronic structure theory and their influence on the accuracy of ab initio potential energy surfaces

    NASA Technical Reports Server (NTRS)

    Bauschlicher, Charles W., Jr.; Langhoff, Stephen R.; Taylor, Peter R.

    1989-01-01

    Recent advances in electronic structure theory and the availability of high speed vector processors have substantially increased the accuracy of ab initio potential energy surfaces. The recently developed atomic natural orbital approach for basis set contraction has reduced both the basis set incompleteness and superposition errors in molecular calculations. Furthermore, full CI calculations can often be used to calibrate a CASSCF/MRCI approach that quantitatively accounts for the valence correlation energy. These computational advances also provide a vehicle for systematically improving the calculations and for estimating the residual error in the calculations. Calculations on selected diatomic and triatomic systems will be used to illustrate the accuracy that currently can be achieved for molecular systems. In particular, the F + H2 yields HF + H potential energy hypersurface is used to illustrate the impact of these computational advances on the calculation of potential energy surfaces.

  11. Recent advances in electronic structure theory and their influence on the accuracy of ab initio potential energy surfaces

    NASA Technical Reports Server (NTRS)

    Bauschlicher, Charles W., Jr.; Langhoff, Stephen R.; Taylor, Peter R.

    1988-01-01

    Recent advances in electronic structure theory and the availability of high speed vector processors have substantially increased the accuracy of ab initio potential energy surfaces. The recently developed atomic natural orbital approach for basis set contraction has reduced both the basis set incompleteness and superposition errors in molecular calculations. Furthermore, full CI calculations can often be used to calibrate a CASSCF/MRCI approach that quantitatively accounts for the valence correlation energy. These computational advances also provide a vehicle for systematically improving the calculations and for estimating the residual error in the calculations. Calculations on selected diatomic and triatomic systems will be used to illustrate the accuracy that currently can be achieved for molecular systems. In particular, the F+H2 yields HF+H potential energy hypersurface is used to illustrate the impact of these computational advances on the calculation of potential energy surfaces.

  12. 41 CFR 105-50.303 - Cost basis in lieu of fees.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Cost basis in lieu of fees. 105-50.303 Section 105-50.303 Public Contracts and Property Management Federal Property... § 105-50.303 Cost basis in lieu of fees. Where the cost of services is to be recovered on other than a...

  13. 26 CFR 1.734-1 - Optional adjustment to basis of undistributed partnership property.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... partner. See § 1.460-4(k)(2)(iv)(D) for a rule determining the partnership's basis in a long-term contract accounted for under a long-term contract method of accounting. The provisions of this paragraph (b)(1) are... which the adjustment has been allocated. (e) Recovery of adjustments to basis of partnership property—(1...

  14. 48 CFR 1426.7103-1 - Statutory basis.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... qualified minority business enterprises in awarding contracts under the Act and report annually to Congress... SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Minority Business Reports 1426.7103-1 Statutory basis... responsibility for preparing the report, which includes contracts for Superfund hazardous waste clean-up awarded...

  15. 48 CFR 1426.7103-1 - Statutory basis.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... qualified minority business enterprises in awarding contracts under the Act and report annually to Congress... SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Minority Business Reports 1426.7103-1 Statutory basis... responsibility for preparing the report, which includes contracts for Superfund hazardous waste clean-up awarded...

  16. 48 CFR 32.103 - Progress payments under construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.103... to be withheld shall be made by the contracting officer on a case-by-case basis. Such decisions will... other factors. Upon completion of all contract requirements, retained amounts shall be paid promptly...

  17. 48 CFR 432.007 - Contract financing payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING 432.007 Contract financing payments. The HCA may prescribe, on a case-by-case basis, a shorter period for financing payments. [61 FR 53646, Oct. 15, 1996. Redesignated...

  18. 7 CFR 1780.75 - Contract provisions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE (CONTINUED) WATER AND WASTE LOANS AND GRANTS Planning, Designing, Bidding, Contracting... including the manner by which it will be effected and the basis for settlement. In addition, such contracts...

  19. 46 CFR Sec. 2 - Use of contract for competitive bid and negotiated price awards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 2 Use of contract for competitive bid and negotiated price awards. (a) The NSA-LUMPSUMREP Contract is a Master form of fixed price contract and is applicable to... awarded under the NSA-LUMPSUMREP Contract must be awarded upon the basis of competitive bids. Revised...

  20. 46 CFR Sec. 2 - Use of contract for competitive bid and negotiated price awards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 2 Use of contract for competitive bid and negotiated price awards. (a) The NSA-LUMPSUMREP Contract is a Master form of fixed price contract and is applicable to... awarded under the NSA-LUMPSUMREP Contract must be awarded upon the basis of competitive bids. Revised...

  1. 46 CFR Sec. 2 - Use of contract for competitive bid and negotiated price awards.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 2 Use of contract for competitive bid and negotiated price awards. (a) The NSA-LUMPSUMREP Contract is a Master form of fixed price contract and is applicable to... awarded under the NSA-LUMPSUMREP Contract must be awarded upon the basis of competitive bids. Revised...

  2. 46 CFR Sec. 2 - Use of contract for competitive bid and negotiated price awards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 2 Use of contract for competitive bid and negotiated price awards. (a) The NSA-LUMPSUMREP Contract is a Master form of fixed price contract and is applicable to... awarded under the NSA-LUMPSUMREP Contract must be awarded upon the basis of competitive bids. Revised...

  3. The structure and energetics of Cr(CO)6 and Cr(CO)5

    NASA Technical Reports Server (NTRS)

    Barnes, Leslie A.; Liu, Bowen; Lindh, Roland

    1992-01-01

    The geometric structure of Cr(CO)6 is optimized at the modified coupled pair functional (MCPF), single and double excitation coupled-cluster (CCSD) and CCSD(T) levels of theory (including a perturbational estimate for connected triple excitations), and the force constants for the totally symmetric representation are determined. The geometry of Cr(CO)5 is partially optimized at the MCPF, CCSD, and CCSD(T) levels of theory. Comparison with experimental data shows that the CCSD(T) method gives the best results for the structures and force constants, and that remaining errors are probably due to deficiencies in the one-particle basis sets used for CO. The total binding energies of Cr(CO)6 and Cr(CO)5 are also determined at the MCPF, CCSD, and CCSD(T) levels of theory. The CCSD(T) method gives a much larger total binding energy than either the MCPF or CCSD methods. An analysis of the basis set superposition error (BSSE) at the MCPF level of treatment points out limitations in the one-particle basis used. Calculations using larger basis sets reduce the BSSE, but the total binding energy of Cr(CO)6 is still significantly smaller than the experimental value, although the first CO bond dissociation energy of Cr(CO)6 is well described. An investigation of 3s3p correlation reveals only a small effect. In the largest basis set, the total CO binding energy of Cr(CO)6 is estimated to be 140 kcal/mol at the CCSD(T) level of theory, or about 86 percent of the experimental value. The remaining discrepancy between the experimental and theoretical value is probably due to limitations in the one-particle basis, rather than limitations in the correlation treatment. In particular an additional d function and an f function on each C and O are needed to obtain quantitative results. This is underscored by the fact that even using a very large primitive set (1042 primitive functions contracted to 300 basis functions), the superposition error for the total binding energy of Cr(CO)6 is 22 kcal/mol at the MCPF level of treatment.

  4. 7 CFR 51.54 - Plant survey.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 2 2014-01-01 2014-01-01 false Plant survey. 51.54 Section 51.54 Agriculture... Contract Basis § 51.54 Plant survey. Prior to the inauguration of continuous Federal or Federal-State Inspection Service on a contract basis, the Administrator will make or cause to be made a survey and...

  5. 7 CFR 51.54 - Plant survey.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 2 2013-01-01 2013-01-01 false Plant survey. 51.54 Section 51.54 Agriculture... Contract Basis § 51.54 Plant survey. Prior to the inauguration of continuous Federal or Federal-State Inspection Service on a contract basis, the Administrator will make or cause to be made a survey and...

  6. 41 CFR 102-73.55 - On what basis must Federal agencies acquire leases?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false On what basis must Federal agencies acquire leases? 102-73.55 Section 102-73.55 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 73...

  7. Symmetry and equivalence restrictions in electronic structure calculations

    NASA Technical Reports Server (NTRS)

    Bauschlicher, Charles W., Jr.; Taylor, Peter R.

    1988-01-01

    A simple method for obtaining MCSCF orbitals and CI natural orbitals adapted to degenerate point groups, with full symmetry and equivalnece restrictions, is described. Among several advantages accruing from this method are the ability to perform atomic SCF calculations on states for which the SCF energy expression cannot be written in terms of Coulomb and exchange integrals over real orbitals, and the generation of symmetry-adapted atomic natural orbitals for use in a recently proposed method for basis set contraction.

  8. 23 CFR 635.114 - Award of contract and concurrence in award.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.114 Award of contract and concurrence in award. (a) Federal-aid contracts shall be awarded only on the basis of the lowest responsive... 23 Highways 1 2010-04-01 2010-04-01 false Award of contract and concurrence in award. 635.114...

  9. 75 FR 82095 - Service Contracts Inventory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... problems in accessing the documents located in ADAMS, contact the NRC's PDR reference staff at 1-800-397... personal services contract; and 7. Whether the contract was awarded on a non-competitive basis. The NRC...

  10. Development of new business opportunities for minorities in nuclear energy. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spight, C.

    1980-12-15

    In Part I of this report the basis for the optimal development of new business opportunities for minorities in nuclear energy programs is defined within the successful completion of all contract tasks. The basis presented consists of an identification of a set of qualified minority-owned small businesses, a defined reservoir of highly trained minorities with applicable expertise, a policy context for the development of opportunities, and a proposed networking structure for information transfer/professional development. In Part II a contractor-focused analysis of the structure of the nuclear industry, a breakdown of the DOE nuclear program by region and functional area, andmore » a directory of minority-owned small businesses by region are presented.« less

  11. A Revised Contract for College Students

    ERIC Educational Resources Information Center

    Ohles, John F.

    1970-01-01

    One way for the university to reassert its position in education is to require of all applicants for admission the signing of a formal contract and to adhere rigidly to the contract on an individual basis. The contract would establish financial obligations and required behavior of the students. (CK)

  12. 48 CFR 1552.209-74 - Limitation of future contracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... an equal basis with other companies. (b) The Contractor will be ineligible to enter into a contract... subcontract under an EPA contract, which supports EPA's performance of Superfund Headquarters policy work... contract requires access to proprietary or confidential business or financial data of other companies, and...

  13. 78 FR 48728 - International Mail Contract

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... POSTAL REGULATORY COMMISSION [Docket No. CP2013-39; Order No. 1798] International Mail Contract... provide its contracting partner, on a periodic basis, with a list of countries to which Commercial ePacket... an Additional Global Plus 1C Contract, January 11, 2013. IV. Ordering Paragraphs It is ordered: 1...

  14. Computational studies of metal-metal and metal-ligand interactions

    NASA Technical Reports Server (NTRS)

    Barnes, Leslie A.

    1992-01-01

    The geometric structure of Cr(CO)6 is optimized at the modified coupled-pair functional (MCPF), single and double excitation coupled-cluster (CCSD) and CCSD(T) levels of theory (including a perturbational estimate for connected triple excitations), and the force constants for the totally symmetric representation are determined. The geometry of Cr(CO)5 is partially optimized at the MCPF, CCSD and CCSD(T) levels of theory. Comparison with experimental data shows that the CCSD(T) method gives the best results for the structures and force constants, and that remaining errors are probably due to deficiencies in the one-particle basis sets used for CO. A detailed comparison of the properties of free CO is therefore given, at both the MCPF and CCSD/CCSD(T) levels of treatment, using a variety of basis sets. With very large one-particle basis sets, the SSCD(T) method gives excellent results for the bond distance, dipole moment and harmonic frequency of free CO. The total binding energies of Cr(CO)6 and Cr(CO)5 are also determined at the MCPF, CCSD and CCSD(T) levels of theory. The CCSD(T) method gives a much larger total binding energy than either the MCPF or CCSD methods. An analysis of the basis set superposition error (BSSE) at the MCPF level of treatment points out limitations in the one-particle basis used here and in a previous study. Calculations using larger basis sets reduced the BSSE, but the total binding energy of Cr(CO)6 is still significantly smaller than the experimental value, although the first CO bond dissociation energy of Cr(CO)6 is well described. An investigation of 3s3p correlation reveals only a small effect. The remaining discrepancy between the experimental and theoretical total binding energy of Cr(CO)6 is probably due to limitations in the one-particle basis, rather than limitations in the correlation treatment. In particular an additional d function and an f function on each C and O are needed to obtain quantitative results. This is underscored by the fact that even using a very large primitive se (1042 primitive functions contracted to 300 basis functions), the superposition error for the total binding energy of Cr(CO)6 is 22 kcal/mol at the MCPF level of treatment.

  15. 48 CFR 32.102 - Description of contract financing methods.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Description of contract financing methods. (a) Advance payments are advances of money by the Government to a... payments based on costs are made on the basis of costs incurred by the contractor as work progresses under..., contract financing. When appropriate, contract statements of work and pricing arrangements must permit...

  16. An efficient basis set representation for calculating electrons in molecules

    DOE PAGES

    Jones, Jeremiah R.; Rouet, Francois -Henry; Lawler, Keith V.; ...

    2016-04-27

    The method of McCurdy, Baertschy, and Rescigno, is generalised to obtain a straightforward, surprisingly accurate, and scalable numerical representation for calculating the electronic wave functions of molecules. It uses a basis set of product sinc functions arrayed on a Cartesian grid, and yields 1 kcal/mol precision for valence transition energies with a grid resolution of approximately 0.1 bohr. The Coulomb matrix elements are replaced with matrix elements obtained from the kinetic energy operator. A resolution-of-the-identity approximation renders the primitive one- and two-electron matrix elements diagonal; in other words, the Coulomb operator is local with respect to the grid indices. Themore » calculation of contracted two-electron matrix elements among orbitals requires only O( Nlog (N)) multiplication operations, not O( N 4), where N is the number of basis functions; N = n 3 on cubic grids. The representation not only is numerically expedient, but also produces energies and properties superior to those calculated variationally. Absolute energies, absorption cross sections, transition energies, and ionisation potentials are reported for 1- (He +, H + 2), 2- (H 2, He), 10- (CH 4), and 56-electron (C 8H 8) systems.« less

  17. Sensitivity of mechanical and metabolic functions to changes in coronary perfusion: A metabolic basis of perfusion-contraction coupling.

    PubMed

    Askenasy, N

    2000-05-01

    Experimental evidence indicates a metabolic basis of contraction-perfusion coupling during an increase in cardiac work load. This study aims to characterize adjustment of myocardial energy metabolism in response to acute low flow ischemia (LFI), and to determine its involvement in perfusion-contraction coupling. Intracellular parameters were measured in isolated rat hearts by NMR spectroscopy and biochemical methods during 30 min of graded LFI and reperfusion as compared to continuous perfusion (control). Oxygen pressure was set to reach maximal oxygen extraction at 70% coronary flow rate (CFR), therefore oxygen limitation was proportional to coronary underperfusion. At 69, 38 and 10% CFR left ventricular pressures decreased to 71, 43 and 25% of pre-ischemic values respectively (P<0.005 v 97% in control) without an increase in diastolic tone, and recovered to 92+/-3% after 30 min of reperfusion. Despite hydrolysis of high energy phosphates and cellular acidification, ADP concentrations were stable in underperfused hearts. At 69, 38 and 10% CFR, cytosolic phosphorylation potentials (PP) decreased from 74+/-10 m M(-1)during pre-ischemia to 40+/-6, 25+/-4 and 14+/-4 m M(-1)respectively (P<0.05 v 63+/-9 m M(-1)in control), and lactate efflux increased to 256+/-18, 386+/-22 and 490+/-43 micromol /gdw respectively (P<0.005 v 186+/-22 micromol/gdw in control). Glycogen contents decreased (P<0.005 v control) and accounted for 27-30% of lactate efflux. These results indicate: (a) proportionate depression of contraction force and glycogen contents, and increased glucose uptake and anaerobic energy production in the underperfused myocardium. Coordinated modulation of these parameters attributes cytosolic PP a regulatory function; (b) resetting of cytosolic PP to lower levels mediates perfusion-contraction coupling during graded LFI. The data are consistent with the concept that glycolytic energy production improves myocardial tolerance to ischemia. Copyright 2000 Academic Press.

  18. An Analysis of Contracting Officer Technical Representative Training Requirements.

    DTIC Science & Technology

    1982-06-01

    AI and contract law . On the basis of the perceived need to eliminate superflu- ous material from the training of CA contract representatives and...Cost and pricing principles 3. Basic contract law 4. Types of contracts S. Definition of important terms 6. Understanding the terms and conditions--how...digesting and/or deletions to coincide with the learning objectives developed in Chapter III include: 1. Federal Acquisition Policy 2. Contract Law 3

  19. Computed Potential Energy Surfaces and Minimum Energy Pathway for Chemical Reactions

    NASA Technical Reports Server (NTRS)

    Walch, Stephen P.; Langhoff, S. R. (Technical Monitor)

    1994-01-01

    Computed potential energy surfaces are often required for computation of such observables as rate constants as a function of temperature, product branching ratios, and other detailed properties. We have found that computation of the stationary points/reaction pathways using CASSCF/derivative methods, followed by use of the internally contracted CI method with the Dunning correlation consistent basis sets to obtain accurate energetics, gives useful results for a number of chemically important systems. Applications to complex reactions leading to NO and soot formation in hydrocarbon combustion are discussed.

  20. 48 CFR 50.103-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contractor's request for contract adjustment. The examples are not intended to exclude other cases in which... 50.103-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT... fact that losses occur under a contract is not sufficient basis for exercising the authority conferred...

  1. 48 CFR 50.103-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor's request for contract adjustment. The examples are not intended to exclude other cases in which... 50.103-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT... fact that losses occur under a contract is not sufficient basis for exercising the authority conferred...

  2. 48 CFR 915.404-4-72 - Special considerations for cost-plus-award-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... cost-plus-award-fee contracts. 915.404-4-72 Section 915.404-4-72 Federal Acquisition Regulations System....404-4-72 Special considerations for cost-plus-award-fee contracts. (a) When a contract is to be awarded on a cost-plus-award-fee basis several special considerations are appropriate. Fee objectives for...

  3. 12 CFR Appendix A to Subpart A of... - Minimum Capital Components for Interest Rate and Foreign Exchange Rate Contracts

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... interest rate and foreign exchange rate contracts are computed on the basis of the credit equivalent amounts of such contracts. Credit equivalent amounts are computed for each of the following off-balance... Equivalent Amounts a. The minimum capital components for interest rate and foreign exchange rate contracts...

  4. Quality in applied science

    NASA Astrophysics Data System (ADS)

    Sten, T.

    1993-12-01

    Science is in many senses a special kind of craft and only skilled craftsmen are able to distinguish good work from bad. Due to the variation in approaches, methods and even philosophical basis, it is nearly impossible to derive a general set of quality criteria for scientific work outside specific research traditions. Applied science introduces a new set of quality criteria having to do with the application of results in practical situations and policy making. A scientist doing basic research relates mainly to the scientific community of which he is a member, while in applied contract research the scientist has to consider the impact of his results both for the immediate users and upon interest groups possibly being affected. Application thus raises a whole new set of requirements having to do with business ethics, policy consequences and societal ethics in general.

  5. Structural Basis of Merlin Tumor Suppressor Functions in Neurofibromatosis-2

    DTIC Science & Technology

    2013-10-01

    Neurofibromatosis -2 PRINCIPAL INVESTIGATOR: Tina Izard CONTRACTING ORGANIZATION: The Scripps Research Institute La Jolla, CA 92037-1000...30September2012-29September2013 4. TITLE AND SUBTITLE Structural Basis of Merlin Tumor Suppressor Functions in Neurofibromatosis -2 5a. CONTRACT...14. ABSTRACT Loss-of-function mutations in the neurofibromatosis -2 (NF2) gene lead to familial and sporadic neurological malignancies in man

  6. Semiconductor materials for high frequency solid state sources

    NASA Astrophysics Data System (ADS)

    Grubin, H. L.

    1983-03-01

    The broad goal of the subject contract is to suggest candidate materials for high frequency device operation. During the initial phase of the study, attention has been focused on defining the general role of the band structure and associated scattering processes in determining the response of semiconductors to transient high-speed electrical signals. Moments of the Boltzmann transport equation form the basis of the study, and the scattering rates define the semiconductor under study. The selection of semiconductor materials proceeds from a set of simple, yet significant, set of scaling principles. During the first quarter scaling was associated with what can formally be identified as velocity invariants, but which in more practical terms identifies the relative speed advantages of e.g., InP over GaAs.

  7. Ab initio relativistic effective potentials with spin--orbit operators. III. Rb through Xe

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaJohn, L.A.; Christiansen, P.A.; Ross, R.B.

    A refined version of the ''shape consistent'' effective potential procedure of Christiansen, Lee, and Pitzer was used to compute averaged relativistic effective potentials (AREP) and spin--orbit operators for the elements Rb through Xe. Particular attention was given to the partitioning of the core and valence space and, where appropriate, more than one set of potentials is provided. These are tabulated in analytic form. Gaussian basis sets with contraction coefficients for the lowest energy state of each atom are given. The reliability of the transition metal AREPs was examined by comparing computed atomic excitation energies with accurate all-electron relativistic values. Themore » spin--orbit operators were tested in calculations on selected atoms.« less

  8. Expectations and obligations: professionalism and medicine's social contract with society.

    PubMed

    Cruess, Richard L; Cruess, Sylvia R

    2008-01-01

    As health care has become of great importance to both individual citizens and to society, it has become more important to understand medicine's relationship to the society it serves in order to have a basis for meaningful dialogue. During the past decade, individuals in the medical, legal, social sciences, and health policy fields have suggested that professionalism serves as the basis of medicine's relationship with society, and many have termed this relationship a social contract. However, the concept of medicine's social contract remains vague, and the implications of its existence have not been fully explored. This paper endorses the use of the term social contract, examines the origin of the concept and its relationship to professionalism, traces its evolution and application to medicine, describes the expectations of the various parties to the contract, and explores some of the implications of its use.

  9. Financial and risk considerations for successful disease management programs.

    PubMed

    Baldwin, A L

    1999-11-01

    Results for disease management [DM] programs have not been as positive as hoped because of clinical issues, lack of access to capital, and administrative issues. The financial experience of DM programs can be quite volatile. Financial projections that are protocol-based, rather than experience-based, may understate the revenue required and the range of possible costs for a DM program by understating the impact of complicating conditions and comorbidities. Actuarial tools (risk analysis and risk projection models) support better understanding of DM contracts. In particular, these models can provide the ability to quantify the impact of the factors that drive costs of a contract and the volatility of those costs. This analysis can assist DM companies in setting appropriate revenue and capital targets. Similar analysis by health plans can identify diseases that are good candidates for DM programs and can provide the basis for performance targets.

  10. Low rank factorization of the Coulomb integrals for periodic coupled cluster theory.

    PubMed

    Hummel, Felix; Tsatsoulis, Theodoros; Grüneis, Andreas

    2017-03-28

    We study a tensor hypercontraction decomposition of the Coulomb integrals of periodic systems where the integrals are factorized into a contraction of six matrices of which only two are distinct. We find that the Coulomb integrals can be well approximated in this form already with small matrices compared to the number of real space grid points. The cost of computing the matrices scales as O(N 4 ) using a regularized form of the alternating least squares algorithm. The studied factorization of the Coulomb integrals can be exploited to reduce the scaling of the computational cost of expensive tensor contractions appearing in the amplitude equations of coupled cluster methods with respect to system size. We apply the developed methodologies to calculate the adsorption energy of a single water molecule on a hexagonal boron nitride monolayer in a plane wave basis set and periodic boundary conditions.

  11. Rapid internal contraction boosts DNA friction.

    PubMed

    Otto, Oliver; Sturm, Sebastian; Laohakunakorn, Nadanai; Keyser, Ulrich F; Kroy, Klaus

    2013-01-01

    Macroscopic objects are usually manipulated by force and observed with light. On the nanoscale, however, this is often done oppositely: individual macromolecules are manipulated by light and monitored with force. This procedure, which is the basis of single-molecule force spectroscopy, has led to much of our quantitative understanding of how DNA works, and is now routinely applied to explore molecular structure and interactions, DNA-protein reactions and protein folding. Here we develop the technique further by introducing a dynamic force spectroscopy set-up for a non-invasive inspection of the tension dynamics in a taut strand of DNA. The internal contraction after a sudden release of the molecule is shown to give rise to a drastically enhanced viscous friction, as revealed by the slow relaxation of an attached colloidal tracer. Our systematic theory explains the data quantitatively and provides a powerful tool for the rational design of new dynamic force spectroscopy assays.

  12. 48 CFR 452.237-75 - Restrictions Against Disclosure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses 452.237-75...: Restrictions Against Disclosure (FEB 1988) (a) The Contractor agrees, in the performance of this contract, to... to know” basis. The Contractor agrees to immediately notify in writing, the Contracting Officer...

  13. Commentary: quality of care and cost containment are the hospital-based ambulatory surgery challenges for the future.

    PubMed

    Frezza, E E; Girnys, R P; Silich, R J; Coppa, G F

    2000-01-01

    Cost containment and quality of care represent the most important objectives of all health care professionals. Because of its progressive growth over the past decade, ambulatory surgery has become an area where these 2 issues need to be addressed. The goal of this paper is to discuss the economic and quality of care challenges faced by hospitals as they strive to become competitive in the 21st century. The quality of care in ambulatory surgery has been improving because of multidisciplinary activities. Hospitals tend to hire the staff on the basis of their expertise in certain areas, and those personnel do not have to cover other hospital roles. Moreover, the hospital staff is able to seek information at any time from coworkers in other areas of specialty. Ambulatory surgery in a hospital offers advantages, such as multiple operating rooms, multiple skilled health care providers, and the ability to stay overnight if needed. The consolidation of supplies makes it easier to contract for a better price. Aggressive contract negotiations and implementation of cost-effective and cost-efficient strategies are the keys to success in the future. Quality improvement (QI) initiatives and quality of care (QC) indicators need to be developed to address various problems in the ambulatory surgery setting such as unnecessary admissions, inadequate staffing, efficient operating room (OR) utilization, quality of care, and assessment outcome. These initiatives should be addressed at regular meetings where opportunities to improve the ambulatory services are discussed. The number of ambulatory surgery procedures performed each year will continue to increase, although perhaps not at the rate we experienced in the past. Procedures that once were performed in an inpatient setting can now be accomplished on an outpatient basis or even in the physician's office. We will continue to see this shift of volume as technologic advancements and anesthetic agents allow more complex procedures to be performed on an outpatient basis.

  14. Correlation consistent basis sets for actinides. II. The atoms Ac and Np-Lr

    NASA Astrophysics Data System (ADS)

    Feng, Rulin; Peterson, Kirk A.

    2017-08-01

    New correlation consistent basis sets optimized using the all-electron third-order Douglas-Kroll-Hess (DKH3) scalar relativistic Hamiltonian are reported for the actinide elements Ac and Np through Lr. These complete the series of sets reported previously for Th-U [K. A. Peterson, J. Chem. Phys. 142, 074105 (2015); M. Vasiliu et al., J. Phys. Chem. A 119, 11422 (2015)]. The new sets range in size from double- to quadruple-zeta and encompass both those optimized for valence (6s6p5f7s6d) and outer-core electron correlations (valence + 5s5p5d). The final sets have been contracted for both the DKH3 and eXact 2-component (X2C) Hamiltonians, yielding cc-pVnZ-DK3/cc-pVnZ-X2C sets for valence correlation and cc-pwCVnZ-DK3/cc-pwCVnZ-X2C sets for outer-core correlation (n = D, T, Q in each case). In order to test the effectiveness of the new basis sets, both atomic and molecular benchmark calculations have been carried out. In the first case, the first three atomic ionization potentials (IPs) of all the actinide elements Ac-Lr have been calculated using the Feller-Peterson-Dixon (FPD) composite approach, primarily with the multireference configuration interaction (MRCI) method. Excellent convergence towards the respective complete basis set (CBS) limits is achieved with the new sets, leading to good agreement with experiment, where these exist, after accurately accounting for spin-orbit effects using the 4-component Dirac-Hartree-Fock method. For a molecular test, the IP and atomization energy (AE) of PuO2 have been calculated also using the FPD method but using a coupled cluster approach with spin-orbit coupling accounted for using the 4-component MRCI. The present calculations yield an IP0 for PuO2 of 159.8 kcal/mol, which is in excellent agreement with the experimental electron transfer bracketing value of 162 ± 3 kcal/mol. Likewise, the calculated 0 K AE of 305.6 kcal/mol is in very good agreement with the currently accepted experimental value of 303.1 ± 5 kcal/mol. The ground state of PuO2 is predicted to be the 0 g +5Σ state.

  15. Correlation consistent basis sets for actinides. II. The atoms Ac and Np-Lr.

    PubMed

    Feng, Rulin; Peterson, Kirk A

    2017-08-28

    New correlation consistent basis sets optimized using the all-electron third-order Douglas-Kroll-Hess (DKH3) scalar relativistic Hamiltonian are reported for the actinide elements Ac and Np through Lr. These complete the series of sets reported previously for Th-U [K. A. Peterson, J. Chem. Phys. 142, 074105 (2015); M. Vasiliu et al., J. Phys. Chem. A 119, 11422 (2015)]. The new sets range in size from double- to quadruple-zeta and encompass both those optimized for valence (6s6p5f7s6d) and outer-core electron correlations (valence + 5s5p5d). The final sets have been contracted for both the DKH3 and eXact 2-component (X2C) Hamiltonians, yielding cc-pVnZ-DK3/cc-pVnZ-X2C sets for valence correlation and cc-pwCVnZ-DK3/cc-pwCVnZ-X2C sets for outer-core correlation (n = D, T, Q in each case). In order to test the effectiveness of the new basis sets, both atomic and molecular benchmark calculations have been carried out. In the first case, the first three atomic ionization potentials (IPs) of all the actinide elements Ac-Lr have been calculated using the Feller-Peterson-Dixon (FPD) composite approach, primarily with the multireference configuration interaction (MRCI) method. Excellent convergence towards the respective complete basis set (CBS) limits is achieved with the new sets, leading to good agreement with experiment, where these exist, after accurately accounting for spin-orbit effects using the 4-component Dirac-Hartree-Fock method. For a molecular test, the IP and atomization energy (AE) of PuO 2 have been calculated also using the FPD method but using a coupled cluster approach with spin-orbit coupling accounted for using the 4-component MRCI. The present calculations yield an IP 0 for PuO 2 of 159.8 kcal/mol, which is in excellent agreement with the experimental electron transfer bracketing value of 162 ± 3 kcal/mol. Likewise, the calculated 0 K AE of 305.6 kcal/mol is in very good agreement with the currently accepted experimental value of 303.1 ± 5 kcal/mol. The ground state of PuO 2 is predicted to be the Σ0g+5 state.

  16. 48 CFR 2415.304 - Evaluation factors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEVELOPMENT CONTRACTING METHODS AND CONTRACTING TYPES CONTRACTING BY NEGOTIATION Source Selection 2415.304... assigned a numerical weight (except for pass-fail factors) which shall appear in the RFP. When using LPTA, each evaluation factor is applied on a “pass-fail” basis; numerical scores are not assigned. “Pass-fail...

  17. 48 CFR 552.237-73 - Restriction on Disclosure of Information.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 552... contract, keep all information contained in source documents or other media furnished by the Government in...., on a “need to know” basis. The Contractor shall immediately notify, in writing, the Contracting...

  18. 48 CFR 49.305-2 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Construction contracts. 49... Convenience 49.305-2 Construction contracts. (a) The percentage of completion basis refers to the contractor's total effort and not solely to the actual construction work. Generally, the effort of a contractor under...

  19. 48 CFR 49.305-2 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Construction contracts. 49... Convenience 49.305-2 Construction contracts. (a) The percentage of completion basis refers to the contractor's total effort and not solely to the actual construction work. Generally, the effort of a contractor under...

  20. 48 CFR 49.305-2 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Construction contracts. 49... Convenience 49.305-2 Construction contracts. (a) The percentage of completion basis refers to the contractor's total effort and not solely to the actual construction work. Generally, the effort of a contractor under...

  1. GSA’s Guidance and Oversight Concerning Areawide Utility Contracts

    DTIC Science & Technology

    2001-12-17

    providers enter into areawide contracts to cover the service needs of federal agencies within the utility’s franchise territory. The franchise territory...is a geographical area that a utility has a right to serve on the basis of a franchise or other legal means. Areawide contracts provide a

  2. Did We Say That? Consumerism and Contract Law.

    ERIC Educational Resources Information Center

    Nordin, Virginia Davis

    1982-01-01

    The dominant emerging concept in academic contract theory is that the student-college relationship is not a commercially binding contract but a more flexible quasi-contractual relationship. It allows the university maximum control of the relationship on a continuing basis, allows development of some student rights, and combines traditional and…

  3. 77 FR 42349 - Self-Regulatory Organizations; NYSE Amex LLC; Order Approving a Proposed Rule Change Defining a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-18

    ... size pro-rata basis, and do not compete for the allocation of non-Directed Orders of five contracts or... than a round robin allocation of non-Directed Orders for five contracts or fewer, all such orders would... Specialist's quote size is less than the order of five contracts or fewer, any remaining contracts after the...

  4. Performance Contracting in Elementary and Secondary Education. A Report Showing the Developments on a Nationwide Basis and the Implications for New York State.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany. Div. of Evaluation.

    This paper describes the historical development of performance contracting, discusses the first performance contracting experiment, cites reactions to performance contracting, and supplies supportive data. The contents are designed to assist the New York State Board of Regents to determine policy for the State Education Department and the New York…

  5. Project Delivery System Mode Decision Based on Uncertain AHP and Fuzzy Sets

    NASA Astrophysics Data System (ADS)

    Kaishan, Liu; Huimin, Li

    2017-12-01

    The project delivery system mode determines the contract pricing type, project management mode and the risk allocation among all participants. Different project delivery system modes have different characteristics and applicable scope. For the owners, the selection of the delivery mode is the key point to decide whether the project can achieve the expected benefits, it relates to the success or failure of project construction. Under the precondition of comprehensively considering the influence factors of the delivery mode, the model of project delivery system mode decision was set up on the basis of uncertain AHP and fuzzy sets, which can well consider the uncertainty and fuzziness when conducting the index evaluation and weight confirmation, so as to rapidly and effectively identify the most suitable delivery mode according to project characteristics. The effectiveness of the model has been verified via the actual case analysis in order to provide reference for the construction project delivery system mode.

  6. 77 FR 47797 - Federal Acquisition Regulation; Small Business Set Asides for Research and Development Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-10

    ... Acquisition Regulation; Small Business Set Asides for Research and Development Contracts AGENCY: Department of... Acquisition Regulation (FAR) to clarify that contracting officers shall set aside acquisitions for research..., and NASA are proposing to amend the Federal Acquisition Regulation (FAR) to revise paragraph (b)(2) of...

  7. 13 CFR 126.607 - When must a contracting officer set aside a requirement for qualified HUBZone SBCs?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... fair market prices. This requirement does not preclude a contracting officer from setting aside a... will be made at fair market prices. However, after conducting market research, the contracting officer... to support the specific set-aside, including the type and extent of market research conducted. In...

  8. Fully coupled six-dimensional calculations of the water dimer vibration-rotation-tunneling states with split Wigner pseudospectral approach. II. Improvements and tests of additional potentials

    NASA Astrophysics Data System (ADS)

    Fellers, R. S.; Braly, L. B.; Saykally, R. J.; Leforestier, C.

    1999-04-01

    The SWPS method is improved by the addition of H.E.G. contractions for generating a more compact basis. An error in the definition of the internal fragment axis system used in our previous calculation is described and corrected. Fully coupled 6D (rigid monomers) VRT states are computed for several new water dimer potential surfaces and compared with experiment and our earlier SWPS results. This work sets the stage for refinement of such potential surfaces via regression analysis of VRT spectroscopic data.

  9. 45 CFR 1634.3 - Competition for grants and contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CORPORATION COMPETITIVE BIDDING FOR GRANTS AND CONTRACTS § 1634.3 Competition for grants and contracts. (a... Corporation under Section 1006(a)(1)(A) of the LSC Act shall be subject to the competitive bidding process... selected on the basis of the competitive bidding process described in this part. (b) The Corporation shall...

  10. 45 CFR 1634.3 - Competition for grants and contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CORPORATION COMPETITIVE BIDDING FOR GRANTS AND CONTRACTS § 1634.3 Competition for grants and contracts. (a... Corporation under Section 1006(a)(1)(A) of the LSC Act shall be subject to the competitive bidding process... selected on the basis of the competitive bidding process described in this part. (b) The Corporation shall...

  11. 75 FR 24606 - Order Finding That the TCO Financial Basis Contract Traded on the IntercontinentalExchange, Inc...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ...'') contract traded on the IntercontinentalExchange, Inc. (``ICE''), an exempt commercial market (``ECM...\\ significantly broadened the CFTC's regulatory authority with respect to ECMs by creating, in section 2(h)(7) of the CEA, a new regulatory category--ECMs on which significant price discovery contracts (``SPDCs...

  12. 48 CFR 337.103-70 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Child Abuse, in solicitations, contracts, and orders that require performance on Federal land or in a... clause in 352.237-70, Pro-Children Act, in solicitations, contracts, and orders that involve (a... provided to children under the age of 18 on a routine or regular basis pursuant to the Pro-Children Act of...

  13. 48 CFR 337.103-70 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Child Abuse, in solicitations, contracts, and orders that require performance on Federal land or in a... clause in 352.237-70, Pro-Children Act, in solicitations, contracts, and orders that involve (a... provided to children under the age of 18 on a routine or regular basis pursuant to the Pro-Children Act of...

  14. 48 CFR 337.103-70 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Child Abuse, in solicitations, contracts, and orders that require performance on Federal land or in a... clause in 352.237-70, Pro-Children Act, in solicitations, contracts, and orders that involve (a... provided to children under the age of 18 on a routine or regular basis pursuant to the Pro-Children Act of...

  15. 48 CFR 337.103-70 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Child Abuse, in solicitations, contracts, and orders that require performance on Federal land or in a... clause in 352.237-70, Pro-Children Act, in solicitations, contracts, and orders that involve (a... provided to children under the age of 18 on a routine or regular basis pursuant to the Pro-Children Act of...

  16. 48 CFR 15.408 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... If a less economical “make” or “buy” categorization is selected for one or more items of significant... on the basis of adequate price competition; (ii) A fixed-price contract with economic price... acquisition of a commercial item; or (iv) A fixed-price contract with economic price adjustment, for the...

  17. Collaboration in Action: Measuring and Improving Contracting Performance in the University of California Contracting Network

    ERIC Educational Resources Information Center

    Tran, Tam; Bowman-Carpio, LeeAnna; Buscher, Nate; Davidson, Pamela; Ford, Jennifer J.; Jenkins, Erick; Kalay, Hillary Noll; Nakazono, Terry; Orescan, Helene; Sak, Rachael; Shin, Irene

    2017-01-01

    In 2013, the University of California, Biomedical Research, Acceleration, Integration, and Development (UC BRAID) convened a regional network of contracting directors from the five University of California (UC) health campuses to: (i) increase collaboration, (ii) operationalize and measure common metrics as a basis for performance improvement…

  18. Work closely with the business office.

    PubMed

    2011-05-01

    At the University of Pittsburgh Medical Center, members of the case management department work closely with the contracting and business department by pointing out payer issues and keeping the chief financial officer informed about payer requirements that could affect reimbursement. Case managers track payer issues on a dayto-day basis and report trends to the contracting department. Contracting staff obtain input from members of the case management department when negotiating or renegotiating contracts. Changes in payer contracts are communicated to the case management staff.

  19. 48 CFR 1816.405-271 - Base fee.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... For other contracts, such as those for hardware or software development, the procurement officer may... during the life of the contract at defined intervals on a provisional basis. If the final award fee...

  20. 48 CFR 1816.405-271 - Base fee.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... For other contracts, such as those for hardware or software development, the procurement officer may... during the life of the contract at defined intervals on a provisional basis. If the final award fee...

  1. 48 CFR 1816.405-271 - Base fee.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... For other contracts, such as those for hardware or software development, the procurement officer may... during the life of the contract at defined intervals on a provisional basis. If the final award fee...

  2. 48 CFR 1816.405-271 - Base fee.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... For other contracts, such as those for hardware or software development, the procurement officer may... during the life of the contract at defined intervals on a provisional basis. If the final award fee...

  3. 48 CFR 1816.405-271 - Base fee.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... For other contracts, such as those for hardware or software development, the procurement officer may... during the life of the contract at defined intervals on a provisional basis. If the final award fee...

  4. Natural gas price uncertainty and the cost-effectiveness of hedging against low hydropower revenues caused by drought

    NASA Astrophysics Data System (ADS)

    Kern, Jordan D.; Characklis, Gregory W.; Foster, Benjamin T.

    2015-04-01

    Prolonged periods of low reservoir inflows (droughts) significantly reduce a hydropower producer's ability to generate both electricity and revenues. Given the capital intensive nature of the electric power industry, this can impact hydropower producers' ability to pay down outstanding debt, leading to credit rating downgrades, higher interests rates on new debt, and ultimately, greater infrastructure costs. One potential tool for reducing the financial exposure of hydropower producers to drought is hydrologic index insurance, in particular, contracts structured to payout when streamflows drop below a specified level. An ongoing challenge in developing this type of insurance, however, is minimizing contracts' "basis risk," that is, the degree to which contract payouts deviate in timing and/or amount from actual damages experienced by policyholders. In this paper, we show that consideration of year-to-year changes in the value of hydropower (i.e., the cost of replacing it with an alternative energy source during droughts) is critical to reducing contract basis risk. In particular, we find that volatility in the price of natural gas, a key driver of peak electricity prices, can significantly degrade the performance of index insurance unless contracts are designed to explicitly consider natural gas prices when determining payouts. Results show that a combined index whose value is derived from both seasonal streamflows and the spot price of natural gas yields contracts that exhibit both lower basis risk and greater effectiveness in terms of reducing financial exposure.

  5. Arteriolar vasomotor control and contractile performance during fatiguing tetanic contractions in rat skeletal muscle: role of sympathetic system.

    PubMed

    Inagaki, Tadakatsu; Sonobe, Takashi; Poole, David C; Kano, Yutaka

    2010-01-01

    Using a fatiguing stimulation protocol designed specifically to enhance sympathetically-mediated vasoconstrictor tone, we explored the temporal profile of the evoked vasoconstrictor response, evaluated the presence of sympatholysis, and assessed the role of alpha1-adrenergic receptor-mediated vasoconstriction on muscle performance. Spinotrapezius muscles of Wistar rats were exteriorized and stimulated tetanically (100 Hz, 4-7 V, stimulus duration 700 ms) every 3 s for 2.5 min under control and prazosin (1 muM) superfused conditions. The extent and time course of diameter changes in arterioles (2 A) and venules (2 V) were determined after each of 10 discrete sets of muscle stimulation at 5-min intervals. A significant decrease of luminal diameter was observed in arterioles after tetanic contractions at 8-10 sets (8 sets: -34.4%, 9 sets: -39.4%, 10 sets: -38.6% vs pre-contraction at each set, p < 0.01). Prazosin significantly reduced but did not abolish the contraction-induced vasoconstriction. In both conditions, there was no reduction of venules diameter observed. Tetanic contractions force at the final 10th set was significantly decreased to 29.3 +/- 11.9% from pre-fatigue conditions, while tetanic contractions with prazosin force production was maintained at 70.4 +/- 14.2% at the 10th set. We conclude that in sequential bouts of contractions there was a progressively greater degree of arteriolar (but not venular) vasoconstriction which was attenuated substantially by prazosin.

  6. Studies of vascular tolerance to nitroglycerin: effects of N-acetylcysteine, NG-monomethyl L-arginine, and endothelin-1.

    PubMed

    Lawson, D L; Haught, W H; Mehta, P; Mehta, J L

    1996-09-01

    Development of vascular tolerance to nitroglycerin (NTG) has been attributed to sulfhydryl (SH) depletion, guanylate cyclase desensitization, or both. Controversy regarding the precise contribution of these mechanisms may be due to variations in experimental design. To examine further the biochemical basis of NTG tolerance, norepinephrine (NE)-precontracted rat aortic rings were exposed to NTG (10(-5)M), which resulted in 84 +/- 6% relaxation. Other rings were first superfused with NTG (10(-6)M) and then contracted with NE. These rings showed a marked tolerance to the vasorelaxant effects of NTG (maximal relaxation 20 +/- 5%, n = 15, p < 0.001 vs. control rings). Similar tolerance to NTG was observed when the vascular rings were first superfused with acetylcholine (ACh 10(-6)M), indicating cross-tolerance between ACh and NTG. Treatment of NTG-tolerant rings with N-acetylcysteine (NAC) (10(-5)M) did not restore vascular smooth muscle (VSM) relaxation in response to NTG (maximal relaxation 23 +/- 5%, n = 8), suggesting that SH depletion may not be the basis of NTG tolerance in these experiments. Parallel sets of NTG-tolerant aortic rings were contracted with endothelin-1 (ET-1, n = 5) or the endothelium-derived relaxing factor (EDRF) synthase inhibitor NG-monomethyl L-arginine (L-NMMA, 10(-4)M, n = 8). In both ET-1- and L-NMMA-contracted rings, vascular relaxation in response to NTG was preserved (80 +/- 6 and 88 +/- 8% relaxation, respectively). Measurement of cyclic GMP in aortic rings showed marked accumulation on initial exposure of tissues to NTG (310 +/- 10 fmol/mg), whereas the NTG-tolerant rings showed much less cyclic GMP accumulation (48 +/- 29 fmol/mg). Rings contracted with L-NMMA or ET-1, but not NE, accumulated cyclic GMP when exposed to NTG (280 +/- 20 fmol/mg). These data indicate that NTG tolerance develops on exposure of vascular rings superfused with NTG or ACh and is probably not related to tissue SH depletion. Contraction of NTG-tolerant rings with ET-1 or L-NMMA restores NTG-mediated relaxation.

  7. 13 CFR 125.19 - When may a contracting officer set-aside a procurement for SDVO SBCs?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... made at fair market price. Effective Date Note: At 75 FR 62281, Oct. 7, 2010, § 125.19 was amended by... market prices. This requirement does not preclude a contracting officer from setting aside a contract... fair market prices. However, after conducting market research, the contracting officer shall first...

  8. SUPPORT Tools for evidence-informed health Policymaking (STP) 3: Setting priorities for supporting evidence-informed policymaking

    PubMed Central

    2009-01-01

    This article is part of a series written for people responsible for making decisions about health policies and programmes and for those who support these decision makers. Policymakers have limited resources for developing – or supporting the development of – evidence-informed policies and programmes. These required resources include staff time, staff infrastructural needs (such as access to a librarian or journal article purchasing), and ongoing professional development. They may therefore prefer instead to contract out such work to independent units with more suitably skilled staff and appropriate infrastructure. However, policymakers may only have limited financial resources to do so. Regardless of whether the support for evidence-informed policymaking is provided in-house or contracted out, or whether it is centralised or decentralised, resources always need to be used wisely in order to maximise their impact. Examples of undesirable practices in a priority-setting approach include timelines to support evidence-informed policymaking being negotiated on a case-by-case basis (instead of having clear norms about the level of support that can be provided for each timeline), implicit (rather than explicit) criteria for setting priorities, ad hoc (rather than systematic and explicit) priority-setting process, and the absence of both a communications plan and a monitoring and evaluation plan. In this article, we suggest questions that can guide those setting priorities for finding and using research evidence to support evidence-informed policymaking. These are: 1. Does the approach to prioritisation make clear the timelines that have been set for addressing high-priority issues in different ways? 2. Does the approach incorporate explicit criteria for determining priorities? 3. Does the approach incorporate an explicit process for determining priorities? 4. Does the approach incorporate a communications strategy and a monitoring and evaluation plan? PMID:20018110

  9. SUPPORT Tools for evidence-informed health Policymaking (STP) 3: Setting priorities for supporting evidence-informed policymaking.

    PubMed

    Lavis, John N; Oxman, Andrew D; Lewin, Simon; Fretheim, Atle

    2009-12-16

    This article is part of a series written for people responsible for making decisions about health policies and programmes and for those who support these decision makers. Policymakers have limited resources for developing--or supporting the development of--evidence-informed policies and programmes. These required resources include staff time, staff infrastructural needs (such as access to a librarian or journal article purchasing), and ongoing professional development. They may therefore prefer instead to contract out such work to independent units with more suitably skilled staff and appropriate infrastructure. However, policymakers may only have limited financial resources to do so. Regardless of whether the support for evidence-informed policymaking is provided in-house or contracted out, or whether it is centralised or decentralised, resources always need to be used wisely in order to maximise their impact. Examples of undesirable practices in a priority-setting approach include timelines to support evidence-informed policymaking being negotiated on a case-by-case basis (instead of having clear norms about the level of support that can be provided for each timeline), implicit (rather than explicit) criteria for setting priorities, ad hoc (rather than systematic and explicit) priority-setting process, and the absence of both a communications plan and a monitoring and evaluation plan. In this article, we suggest questions that can guide those setting priorities for finding and using research evidence to support evidence-informed policymaking. These are: 1. Does the approach to prioritisation make clear the timelines that have been set for addressing high-priority issues in different ways? 2. Does the approach incorporate explicit criteria for determining priorities? 3. Does the approach incorporate an explicit process for determining priorities? 4. Does the approach incorporate a communications strategy and a monitoring and evaluation plan?

  10. 48 CFR 47.301-3 - Using the Defense Transportation System (DTS).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... implemented on a world-wide basis. (b) Contracting activities are responsible for (1) ensuring that the... directly to a military air or water port terminal without authorization from the designated contract...

  11. 48 CFR 1913.505-2 - Board order forms in lieu of Optional and Standard Forms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... BROADCASTING BOARD OF GOVERNORS CONTRACTING METHODS AND CONTRACT TYPES SMALL PURCHASES AND OTHER SIMPLIFIED...-case basis, in order to accommodate computer-generated purchase order forms. Exception approval for...

  12. 48 CFR 1913.505-2 - Board order forms in lieu of Optional and Standard Forms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BROADCASTING BOARD OF GOVERNORS CONTRACTING METHODS AND CONTRACT TYPES SMALL PURCHASES AND OTHER SIMPLIFIED...-case basis, in order to accommodate computer-generated purchase order forms. Exception approval for...

  13. XZP + 1d and XZP + 1d-DKH basis sets for second-row elements: application to CCSD(T) zero-point vibrational energy and atomization energy calculations.

    PubMed

    Campos, Cesar T; Jorge, Francisco E; Alves, Júlia M A

    2012-09-01

    Recently, segmented all-electron contracted double, triple, quadruple, quintuple, and sextuple zeta valence plus polarization function (XZP, X = D, T, Q, 5, and 6) basis sets for the elements from H to Ar were constructed for use in conjunction with nonrelativistic and Douglas-Kroll-Hess Hamiltonians. In this work, in order to obtain a better description of some molecular properties, the XZP sets for the second-row elements were augmented with high-exponent d "inner polarization functions," which were optimized in the molecular environment at the second-order Møller-Plesset level. At the coupled cluster level of theory, the inclusion of tight d functions for these elements was found to be essential to improve the agreement between theoretical and experimental zero-point vibrational energies (ZPVEs) and atomization energies. For all of the molecules studied, the ZPVE errors were always smaller than 0.5 %. The atomization energies were also improved by applying corrections due to core/valence correlation and atomic spin-orbit effects. This led to estimates for the atomization energies of various compounds in the gaseous phase. The largest error (1.2 kcal mol(-1)) was found for SiH(4).

  14. An exact variational method to calculate rovibrational spectra of polyatomic molecules with large amplitude motion

    NASA Astrophysics Data System (ADS)

    Yu, Hua-Gen

    2016-08-01

    We report a new full-dimensional variational algorithm to calculate rovibrational spectra of polyatomic molecules using an exact quantum mechanical Hamiltonian. The rovibrational Hamiltonian of system is derived in a set of orthogonal polyspherical coordinates in the body-fixed frame. It is expressed in an explicitly Hermitian form. The Hamiltonian has a universal formulation regardless of the choice of orthogonal polyspherical coordinates and the number of atoms in molecule, which is suitable for developing a general program to study the spectra of many polyatomic systems. An efficient coupled-state approach is also proposed to solve the eigenvalue problem of the Hamiltonian using a multi-layer Lanczos iterative diagonalization approach via a set of direct product basis set in three coordinate groups: radial coordinates, angular variables, and overall rotational angles. A simple set of symmetric top rotational functions is used for the overall rotation whereas a potential-optimized discrete variable representation method is employed in radial coordinates. A set of contracted vibrationally diabatic basis functions is adopted in internal angular variables. Those diabatic functions are first computed using a neural network iterative diagonalization method based on a reduced-dimension Hamiltonian but only once. The final rovibrational energies are computed using a modified Lanczos method for a given total angular momentum J, which is usually fast. Two numerical applications to CH4 and H2CO are given, together with a comparison with previous results.

  15. An exact variational method to calculate rovibrational spectra of polyatomic molecules with large amplitude motion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yu, Hua-Gen, E-mail: hgy@bnl.gov

    We report a new full-dimensional variational algorithm to calculate rovibrational spectra of polyatomic molecules using an exact quantum mechanical Hamiltonian. The rovibrational Hamiltonian of system is derived in a set of orthogonal polyspherical coordinates in the body-fixed frame. It is expressed in an explicitly Hermitian form. The Hamiltonian has a universal formulation regardless of the choice of orthogonal polyspherical coordinates and the number of atoms in molecule, which is suitable for developing a general program to study the spectra of many polyatomic systems. An efficient coupled-state approach is also proposed to solve the eigenvalue problem of the Hamiltonian using amore » multi-layer Lanczos iterative diagonalization approach via a set of direct product basis set in three coordinate groups: radial coordinates, angular variables, and overall rotational angles. A simple set of symmetric top rotational functions is used for the overall rotation whereas a potential-optimized discrete variable representation method is employed in radial coordinates. A set of contracted vibrationally diabatic basis functions is adopted in internal angular variables. Those diabatic functions are first computed using a neural network iterative diagonalization method based on a reduced-dimension Hamiltonian but only once. The final rovibrational energies are computed using a modified Lanczos method for a given total angular momentum J, which is usually fast. Two numerical applications to CH{sub 4} and H{sub 2}CO are given, together with a comparison with previous results.« less

  16. 2 CFR Appendix A to Part 215 - Contract Provisions

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., contractors shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages... construction contracts and in excess of $2500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  17. 34 CFR Appendix A to Part 74 - Contract Provisions

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages... construction contracts and in excess of $2500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  18. 7 CFR Appendix A to Part 3019 - Contract Provisions

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., contractors shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages... construction contracts and in excess of $2500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  19. 36 CFR Appendix A to Part 1210 - Contract Provisions

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages... construction contracts and in excess of $2,500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  20. 36 CFR Appendix A to Part 1210 - Contract Provisions

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages... construction contracts and in excess of $2,500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  1. 34 CFR Appendix A to Part 74 - Contract Provisions

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages... construction contracts and in excess of $2500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  2. 34 CFR Appendix A to Part 74 - Contract Provisions

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages... construction contracts and in excess of $2500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  3. 7 CFR Appendix A to Part 3019 - Contract Provisions

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., contractors shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages... construction contracts and in excess of $2500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  4. 2 CFR Appendix A to Part 215 - Contract Provisions

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., contractors shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages... construction contracts and in excess of $2500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  5. 7 CFR Appendix A to Part 3019 - Contract Provisions

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., contractors shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages... construction contracts and in excess of $2500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  6. Long-term contracts for forest land and timber in the South

    Treesearch

    William C. Siegel

    1973-01-01

    By means of long-term contracts, southern wood-using industries control almost 7 million acres of privately owned, nonindustrial forest. While pine is the prevalent timber type under contract, there are also substantial acreages of hardwood. Nearly all agreements are written on an individual basis, but most fit into one of several broad categories.

  7. Contract Terminations for Default and Convenience.

    DTIC Science & Technology

    1981-06-01

    principal rights acquired by the Government under the default clause, according to Govern- ment Contract Law (M8157), is the right to repurchase the 2 item...with the conver- sion of terminations from default to convenience in any detail (21:539). Government Contract Law presented an ex- cellent summary of...factors leading to the conversion were analyzed on the basis of the DAR, principles of contract law , and studies included in the literature review

  8. Variational Calculations of Ro-Vibrational Energy Levels and Transition Intensities for Tetratomic Molecules

    NASA Technical Reports Server (NTRS)

    Schwenke, David W.; Langhoff, Stephen R. (Technical Monitor)

    1995-01-01

    A description is given of an algorithm for computing ro-vibrational energy levels for tetratomic molecules. The expressions required for evaluating transition intensities are also given. The variational principle is used to determine the energy levels and the kinetic energy operator is simple and evaluated exactly. The computational procedure is split up into the determination of one dimensional radial basis functions, the computation of a contracted rotational-bending basis, followed by a final variational step coupling all degrees of freedom. An angular basis is proposed whereby the rotational-bending contraction takes place in three steps. Angular matrix elements of the potential are evaluated by expansion in terms of a suitable basis and the angular integrals are given in a factorized form which simplifies their evaluation. The basis functions in the final variational step have the full permutation symmetries of the identical particles. Sample results are given for HCCH and BH3.

  9. 42 CFR 455.200 - Basis and scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... scope. (a) Statutory basis. This subpart implements section 1936 of the Social Security Act that... contract under the Medicaid Integrity Program and to carry out the Medicaid integrity audit program...

  10. 42 CFR 455.200 - Basis and scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... scope. (a) Statutory basis. This subpart implements section 1936 of the Social Security Act that... contract under the Medicaid Integrity Program and to carry out the Medicaid integrity audit program...

  11. 48 CFR 7.103 - Agency-head responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Agency-head responsibilities. 7.103 Section 7.103 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION...) Writing plans either on a systems basis, on an individual contract basis, or on an individual order basis...

  12. 26 CFR 1.863-7 - Allocation of income attributable to certain notional principal contracts under section 863(a).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... basis) so choose. See paragraph (c) of this section for an election to apply the rules of this section... notional principal contract income—(1) General rule. Unless paragraph (b) (2) or (3) of this section... negotiation or acquisition of a notional principal contract may be disregarded if the district director...

  13. 41 CFR Appendix A to Part 105 - 72-Contract Provisions

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... required to pay wages to laborers and mechanics at a rate not less than the minimum wages specified in a... construction contracts and in excess of $2500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  14. 49 CFR Appendix A to Part 19 - Contract Provisions

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., contractors shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages... construction contracts and in excess of $2,500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  15. 41 CFR Appendix A to Part 105 - 72-Contract Provisions

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... required to pay wages to laborers and mechanics at a rate not less than the minimum wages specified in a... construction contracts and in excess of $2500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  16. 10 CFR Appendix A to Subpart B of... - Contract Provisions

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., contractors shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages... construction contracts and in excess of $2500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  17. 10 CFR Appendix A to Subpart B of... - Contract Provisions

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., contractors shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages... construction contracts and in excess of $2500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  18. 41 CFR Appendix A to Part 105 - 72-Contract Provisions

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... required to pay wages to laborers and mechanics at a rate not less than the minimum wages specified in a... construction contracts and in excess of $2500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  19. 49 CFR Appendix A to Part 19 - Contract Provisions

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., contractors shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages... construction contracts and in excess of $2,500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  20. 49 CFR Appendix A to Part 19 - Contract Provisions

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., contractors shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages... construction contracts and in excess of $2,500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  1. 22 CFR Appendix A to Part 518 - Contract Provisions

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., contractors shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages... construction contracts and in excess of $2,500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  2. 10 CFR Appendix A to Subpart B of... - Contract Provisions

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., contractors shall be required to pay wages to laborers and mechanics at a rate not less than the minimum wages... construction contracts and in excess of $2500 for other contracts that involve the employment of mechanics or... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work...

  3. 75 FR 23718 - Orders Finding That the Henry Financial Basis Contract, Henry Financial Index Contract and Henry...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... exempt commercial market (``ECM'') under sections 2(h)(3)-(5) of the Commodity Exchange Act (``CEA'' or... with respect to ECMs by creating, in section 2(h)(7) of the CEA, a new regulatory category--ECMs on which significant price discovery contracts (``SPDCs'') are traded--and treating ECMs in that category...

  4. 26 CFR 1.7702-0 - Table of contents.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... that appear in §§ 1.7702-1, 1.7702-2, and 1.7702-3. § 1.7702-1Mortality charges. (a) General rule. (b...) Effective date. § 1.7702-2Attained age of the insured under a life insurance contract. (a) In general. (b) Contract insuring a single life. (c) Contract insuring multiple lives on a last-to-die basis. (1) In...

  5. Vital signs: taking the pulse of your managed care contract performance.

    PubMed

    Waymack, Pamela M; Ward, William J

    2005-07-01

    Three essential baseline measures of managed care performance that should be reported on a regular basis are: Overall profitability of the organization's managed care portfolio. Payer mix and profitability. Performance of major managed care contracts.

  6. 18 CFR 1316.6 - Discrimination on the basis of age.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... basis of age. 1316.6 Section 1316.6 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... Conditions and Certifications § 1316.6 Discrimination on the basis of age. When so indicated in TVA contract...: Discrimination On The Basis Of Age Executive Order 11141, 3 CFR, 1964-1965 Comp., p. 179, states that it is the...

  7. 18 CFR 1316.6 - Discrimination on the basis of age.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... basis of age. 1316.6 Section 1316.6 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... Conditions and Certifications § 1316.6 Discrimination on the basis of age. When so indicated in TVA contract...: Discrimination On The Basis Of Age Executive Order 11141, 3 CFR, 1964-1965 Comp., p. 179, states that it is the...

  8. 18 CFR 1316.6 - Discrimination on the basis of age.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... basis of age. 1316.6 Section 1316.6 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... Conditions and Certifications § 1316.6 Discrimination on the basis of age. When so indicated in TVA contract...: Discrimination On The Basis Of Age Executive Order 11141, 3 CFR, 1964-1965 Comp., p. 179, states that it is the...

  9. 18 CFR 1316.6 - Discrimination on the basis of age.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... basis of age. 1316.6 Section 1316.6 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... Conditions and Certifications § 1316.6 Discrimination on the basis of age. When so indicated in TVA contract...: Discrimination On The Basis Of Age Executive Order 11141, 3 CFR, 1964-1965 Comp., p. 179, states that it is the...

  10. 18 CFR 1316.6 - Discrimination on the basis of age.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... basis of age. 1316.6 Section 1316.6 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... Conditions and Certifications § 1316.6 Discrimination on the basis of age. When so indicated in TVA contract...: Discrimination On The Basis Of Age Executive Order 11141, 3 CFR, 1964-1965 Comp., p. 179, states that it is the...

  11. Fully coupled six-dimensional calculations of the water dimer vibration-rotation-tunneling states with split Wigner pseudospectral approach. II. Improvements and tests of additional potentials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fellers, R.S.; Braly, L.B.; Saykally, R.J.

    The SWPS method is improved by the addition of H.E.G. contractions for generating a more compact basis. An error in the definition of the internal fragment axis system used in our previous calculation is described and corrected. Fully coupled 6D (rigid monomers) VRT states are computed for several new water dimer potential surfaces and compared with experiment and our earlier SWPS results. This work sets the stage for refinement of such potential surfaces via regression analysis of VRT spectroscopic data. {copyright} {ital 1999 American Institute of Physics.}

  12. 47 CFR 76.125 - Indemnification contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Indemnification contracts. 76.125 Section 76.125 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES... programming in accordance with the provisions of this Subpart unless the licensee has a reasonable basis for...

  13. 47 CFR 76.125 - Indemnification contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Indemnification contracts. 76.125 Section 76.125 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES... programming in accordance with the provisions of this Subpart unless the licensee has a reasonable basis for...

  14. 48 CFR 42.603 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Responsibilities. (a) The CACO shall perform, on a corporate-wide basis, the contract administration functions as designated by the responsible agency. Typical CACO functions include (1) the determination of final indirect cost rates for cost-reimbursement contracts, (2) establishment of advance agreements or recommendations...

  15. 48 CFR 2816.602 - Labor-hour contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Labor-hour contracts. 2816... and Contract Types TYPES OF CONTRACTS Time-and-Materials, Labor-Hour, and Letter Contracts 2816.602 Labor-hour contracts. The limitations set forth in 2816.601 for time-and-material contracts also apply...

  16. 48 CFR 1332.114 - Unusual contract financing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Unusual contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 1332.114 Unusual contract financing. The designee authorized to approve unusual contract financing arrangements is set forth in CAM...

  17. Quantum chemical modeling of perovskite: An investigation of piezoelectricity in ferrite of yttrium.

    PubMed

    de Lira, Fábio Augusto M; Farias, Márcio de Souza; de Figueiredo, Antonio Florêncio; Gil, Fábio dos Santos; dos Santos, Marcos Antonio B; Malheiros, Bruno Veiga; Ferreira, João Elias V; Pinheiro, José Ciríaco; Treu-Filho, Oswaldo; Kondo, Rogério Toshiaki

    2011-07-01

    In a previous article, we used Hartree-Fock (HF) theory to study the piezoelectricity in BaTiO₃. In this paper, we applied the Douglas-Kroll-Hess second order scalar relativistic method to investigate the possible piezoelectric properties in the perovskite YFeO₃ structure, which has not yet been studied experimentally. The 30s20p13d and 31s21p17d Gaussian basis sets for the Fe (⁵D) and Y (²D) atoms, respectively, were built with the Generator Coordinate HF method. After contraction to [13s7p5d] and [13s8p7d], in combination with the 20s14p/6s4p basis set for the O (³P) atom from literature, they had their quality evaluated using calculations of the total and the orbital energies for the ²FeO⁺¹ and ¹YO⁺¹ fragments. The dipole moment, the total energy, and the total atomic charges in YFeO₃ in C(s) space group were calculated. The results and the analysis lead us to believe that the perovskite YFeO₃ does not present piezoelectric properties.

  18. 15 CFR Appendix A to Part 14 - Contract Provisions

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... wages of every mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of... than 11/2 times the basic rate of pay for all hours worked in excess of 40 hours in the work week.... Contract Work Hours and Safety Standards Act (40 U.S.C. 327-333)—Where applicable, all contracts awarded by...

  19. Managing Contract Training Programs: Progress and Proposals. Institute for Studies in Higher Education Policy Paper No. 2.

    ERIC Educational Resources Information Center

    Deegan, William L.

    An overview is provided of community college involvement in providing job training for industry on a contract basis. Part 1 provides background on the changing role of community colleges and the introduction of contract training as a means of addressing the growing need of organizations to train and retrain staff. Part 2 offers a national…

  20. 15 CFR Supplement No. 2 to Part 742 - Anti-Terrorism Controls: North Korea, Syria and Sudan Contract Sanctity Dates and Related Policies

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) Robots capable of employing feedback information in real time processing to generate or modify programs...-uses in Syria will be considered on a case-by case basis. (A) Contract sanctity date for such robots... Supplement. (B) Contract sanctity date for all other such robots: August 28, 1991. (iii) Sudan. Applications...

  1. 15 CFR Supplement No. 2 to Part 742 - Anti-Terrorism Controls: North Korea, Syria and Sudan Contract Sanctity Dates and Related Policies

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) Robots capable of employing feedback information in real time processing to generate or modify programs...-uses in Syria will be considered on a case-by case basis. (A) Contract sanctity date for such robots... Supplement. (B) Contract sanctity date for all other such robots: August 28, 1991. (iii) Sudan. Applications...

  2. 15 CFR Supplement No. 2 to Part 742 - Anti-Terrorism Controls: North Korea, Syria and Sudan Contract Sanctity Dates and Related Policies

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) Robots capable of employing feedback information in real time processing to generate or modify programs...-uses in Syria will be considered on a case-by case basis. (A) Contract sanctity date for such robots... Supplement. (B) Contract sanctity date for all other such robots: August 28, 1991. (iii) Sudan. Applications...

  3. 15 CFR Supplement No. 2 to Part 742 - Anti-Terrorism Controls: North Korea, Syria and Sudan Contract Sanctity Dates and Related Policies

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) Robots capable of employing feedback information in real time processing to generate or modify programs...-uses in Syria will be considered on a case-by case basis. (A) Contract sanctity date for such robots... Supplement. (B) Contract sanctity date for all other such robots: August 28, 1991. (iii) Sudan. Applications...

  4. Estimating user costs as a basis for incentive/disincentive amounts in highway construction contracts.

    DOT National Transportation Integrated Search

    1998-02-01

    The Virginia Department of Transportation (VDOT) occasionally includes an incentive/ disincentive for early completion (I/D) in its construction contracts. This report presents the results of a project to identify procedures that would (1) enhance th...

  5. 48 CFR 239.7405 - Delegated authority for telecommunications resources.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... telecommunications resources. 239.7405 Section 239.7405 Federal Acquisition Regulations System DEFENSE ACQUISITION... TECHNOLOGY Telecommunications Services 239.7405 Delegated authority for telecommunications resources. The contracting officer may enter into a telecommunications service contract on a month-to-month basis or for any...

  6. 48 CFR 239.7405 - Delegated authority for telecommunications resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... telecommunications resources. 239.7405 Section 239.7405 Federal Acquisition Regulations System DEFENSE ACQUISITION... TECHNOLOGY Telecommunications Services 239.7405 Delegated authority for telecommunications resources. The contracting officer may enter into a telecommunications service contract on a month-to-month basis or for any...

  7. 48 CFR 239.7405 - Delegated authority for telecommunications resources.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... telecommunications resources. 239.7405 Section 239.7405 Federal Acquisition Regulations System DEFENSE ACQUISITION... TECHNOLOGY Telecommunications Services 239.7405 Delegated authority for telecommunications resources. The contracting officer may enter into a telecommunications service contract on a month-to-month basis or for any...

  8. 48 CFR 239.7405 - Delegated authority for telecommunications resources.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... telecommunications resources. 239.7405 Section 239.7405 Federal Acquisition Regulations System DEFENSE ACQUISITION... TECHNOLOGY Telecommunications Services 239.7405 Delegated authority for telecommunications resources. The contracting officer may enter into a telecommunications service contract on a month-to-month basis or for any...

  9. 48 CFR 239.7405 - Delegated authority for telecommunications resources.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... telecommunications resources. 239.7405 Section 239.7405 Federal Acquisition Regulations System DEFENSE ACQUISITION... TECHNOLOGY Telecommunications Services 239.7405 Delegated authority for telecommunications resources. The contracting officer may enter into a telecommunications service contract on a month-to-month basis or for any...

  10. "Fee Contracting": Marketing Adult Education Program Offerings on a Cost-Recovery Basis. Cost-Recovery Basis.

    ERIC Educational Resources Information Center

    Creighton, John P.

    This workshop presents a Maryland model of delivering public adult education services to business, industry, and public agencies on a cost-recovery basis. A rationale is discussed for the role of public adult education in provision of services on this basis. Ten ways to get started without a marketing specialist are listed. Good leads to…

  11. 48 CFR 26.206 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... provision at 52.226-3, Disaster or Emergency Area Representation, in solicitations involving the local area... at 52.226-4, Notice of Disaster or Emergency Area Set-aside in solicitations and contracts involving local area set-asides. (c) The contracting officer shall insert the clause at 52.226-5, Restrictions on...

  12. 48 CFR 26.206 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... provision at 52.226-3, Disaster or Emergency Area Representation, in solicitations involving the local area... at 52.226-4, Notice of Disaster or Emergency Area Set-aside in solicitations and contracts involving local area set-asides. (c) The contracting officer shall insert the clause at 52.226-5, Restrictions on...

  13. 48 CFR 26.206 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... provision at 52.226-3, Disaster or Emergency Area Representation, in solicitations involving the local area... at 52.226-4, Notice of Disaster or Emergency Area Set-aside in solicitations and contracts involving local area set-asides. (c) The contracting officer shall insert the clause at 52.226-5, Restrictions on...

  14. 48 CFR 26.206 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... provision at 52.226-3, Disaster or Emergency Area Representation, in solicitations involving the local area... at 52.226-4, Notice of Disaster or Emergency Area Set-aside in solicitations and contracts involving local area set-asides. (c) The contracting officer shall insert the clause at 52.226-5, Restrictions on...

  15. 48 CFR 26.206 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... provision at 52.226-3, Disaster or Emergency Area Representation, in solicitations involving the local area... at 52.226-4, Notice of Disaster or Emergency Area Set-aside in solicitations and contracts involving local area set-asides. (c) The contracting officer shall insert the clause at 52.226-5, Restrictions on...

  16. 25 CFR 533.3 - Submission of management contract for approval.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) For new contracts and new operations, a three (3)-year business plan which sets forth the parties... operations, a three (3)-year business plan which sets forth the parties' goals, objectives, budgets... 25 Indians 2 2010-04-01 2010-04-01 false Submission of management contract for approval. 533.3...

  17. [Gift giving and the ethics of the caregiver].

    PubMed

    Grassin, Marc

    2014-12-01

    Modern societies establish relationships on a contract basis, but the caregiver relationship invariably involves the notion of a gift. Caring engages the giving / receiving / giving back circle of reciprocity. The caregiving relationship requires a gift ethic which gives meaning to the nurse/patient contract.

  18. 41 CFR 101-4.605 - Enforcement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Enforcement procedures. 101-4.605 Section 101-4.605 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  19. 41 CFR 101-4.200 - Application.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Application. 101-4.200 Section 101-4.200 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION...

  20. 41 CFR 101-4.430 - Financial assistance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Financial assistance. 101-4.430 Section 101-4.430 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  1. 41 CFR 101-4.230 - Transition plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Transition plans. 101-4.230 Section 101-4.230 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  2. 41 CFR 101-4.405 - Housing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Housing. 101-4.405 Section 101-4.405 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION...

  3. 41 CFR 101-4.505 - Employment criteria.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Employment criteria. 101-4.505 Section 101-4.505 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  4. 41 CFR 101-4.605 - Enforcement procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Enforcement procedures. 101-4.605 Section 101-4.605 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  5. 41 CFR 101-4.410 - Comparable facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Comparable facilities. 101-4.410 Section 101-4.410 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  6. 41 CFR 101-4.200 - Application.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Application. 101-4.200 Section 101-4.200 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION...

  7. 41 CFR 101-4.510 - Recruitment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Recruitment. 101-4.510 Section 101-4.510 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION...

  8. 41 CFR 101-4.515 - Compensation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Compensation. 101-4.515 Section 101-4.515 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION...

  9. 48 CFR 209.104-4 - Subcontractor responsibility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...'s (CCC) proposal of a firm as its subcontractor is sufficient basis for an affirmative determination of responsibility. However, when the CCC determination of responsibility is not consistent with other information available to the contracting officer, the contracting officer shall request from CCC and any other...

  10. 48 CFR 209.104-4 - Subcontractor responsibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...'s (CCC) proposal of a firm as its subcontractor is sufficient basis for an affirmative determination of responsibility. However, when the CCC determination of responsibility is not consistent with other information available to the contracting officer, the contracting officer shall request from CCC and any other...

  11. The Molecular Basis of Cardiac Mechanics: Regulation of Motor Unit Recruitment

    DTIC Science & Technology

    2001-10-25

    sensitivity, Cooperativity. I. INTRODUCTION The biological linear motor, that produces cardiac and skeletal muscle contraction , is by far smaller than...who have described the role of the mechanical initial loading condition (Preload) on muscle contraction and by Fenn (1923) who has showed that the...2437, 1982. [4] E. Eisenberg, and T. L. Hill. Muscle contraction and energy transduction in biological system. Science 227: 999-1006, 1985. [5

  12. Lower energy and pulse stacking. A safer alternative for skin tightening using fractional CO2 laser.

    PubMed

    Motta, Marcos Matias; Stelini, Rafael Fantelli; Calderoni, Davi Reis; Gilioli, Rovilson; Kharmandayan, Paulo

    2016-01-01

    To evaluate the effect of different energies and stacking in skin shrinkage. Three decreasing settings of a fractional CO2 laser were applied to the abdomen of Twenty five Wistar rats divided into three groups. Group I (n=5) was histologically evaluated for microthermal zones dimensions. Groups II and III (n=10 each) were macroscopic evaluated with freeware ImageJ for area contraction immediately and after 30 and 60 days. No statistical significance was found within microthermal zone histological dimensions (Group I) in all settings studied. (Ablation depth: 76.90 to 97.18µm; Coagulation depth: 186.01 to 219.84 µm). In Group II, macroscopic evaluation showed that all settings cause significant immediate skin contraction. The highest setting cause significant more intense tightening effect initially, contracting skin area from 258.65 to 179.09 mm2. The same pattern was observed in Group III. At 30 and 60 days, the lowest setting significantly sustained contraction. Lower fractional CO2 laser energies associated to pulse stacking could cause consistent and long lasting tissue contraction in rats.

  13. An accurate and efficient computational protocol for obtaining the complete basis set limits of the binding energies of water clusters at the MP2 and CCSD(T) levels of theory: Application to (H₂O) m, m=2-6, 8, 11, 16 and 17

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miliordos, Evangelos; Xantheas, Sotiris S.

    2015-06-21

    We report MP2 and CCSD(T) binding energies with basis sets up to pentuple zeta quality for the m = 2-6, 8 clusters. Or best CCSD(T)/CBS estimates are -4.99 kcal/mol (dimer), -15.77 kcal/mol (trimer), -27.39 kcal/mol (tetramer), -35.9 ± 0.3 kcal/mol (pentamer), -46.2 ± 0.3 kcal/mol (prism hexamer), -45.9 ± 0.3 kcal/mol (cage hexamer), -45.4 ± 0.3 kcal/mol (book hexamer), -44.3 ± 0.3 kcal/mol (ring hexamer), -73.0 ± 0.5 kcal/mol (D 2d octamer) and -72.9 ± 0.5 kcal/mol (S4 octamer). We have found that the percentage of both the uncorrected (dimer) and BSSE-corrected (dimer CP e) binding energies recovered with respectmore » to the CBS limit falls into a narrow range for each basis set for all clusters and in addition this range was found to decrease upon increasing the basis set. Relatively accurate estimates (within < 0.5%) of the CBS limits can be obtained when using the “ 2/3, 1/3” (for the AVDZ set) or the “½ , ½” (for the AVTZ, AVQZ and AV5Z sets) mixing ratio between dimer e and dimer CPe. Based on those findings we propose an accurate and efficient computational protocol that can be used to estimate accurate binding energies of clusters at the MP2 (for up to 100 molecules) and CCSD(T) (for up to 30 molecules) levels of theory. This work was supported by the US Department of Energy, Office of Science, Office of Basic Energy Sciences, Division of Chemical Sciences, Geosciences and Biosciences. Pacific Northwest National Laboratory (PNNL) is a multi program national laboratory operated for DOE by Battelle. This research also used resources of the National Energy Research Scientific Computing Center, which is supported by the Office of Science of the U.S. Department of Energy under Contract No. AC02-05CH11231.« less

  14. 24 CFR 891.560 - HAP contract.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract. 891.560 Section 891... Assistance § 891.560 HAP contract. (a) HAP contract. The housing assistance payments contract sets forth.... (b) HAP contract execution. (1) Upon satisfactory completion of the project, the Borrower and HUD...

  15. Decision and coordination of low-carbon supply chain considering technological spillover and environmental awareness.

    PubMed

    Xu, Lang; Wang, Chuanxu; Li, Hui

    2017-06-08

    We focus on the impacts of technological spillovers and environmental awareness in a two-echelon supply chain with one-single supplier and one-single manufacturer to reduce carbon emission. In this supply chain, carbon abatement investment becomes one of key factors of cutting costs and improving profits, which is reducing production costs in the components and products-the investment from players in supply chain. On the basis of optimality theory, the centralized and decentralized models are respectively established to investigate the optimal decisions and profits. Further, setting the players' profits of the decentralized scenario as the disagreement points, we propose a bargaining-coordination contract through revenue-cost sharing to enhance the performance. Finally, by theoretical comparison and numerical analysis, the results show that: (i) The optimal profits of players and supply chain improve as technological spillovers and environmental awareness increase, and the profits of them in the bargaining-coordination contract are higher than that in the decentralized scenario; (ii) Technological spillovers between the players amplify the impact of "free-ride" behavior, in which the supplier always incentives the manufacturer to improve carbon emission intensity, but the cooperation will achieves and the profits will improve only when technological spillovers and environmental awareness are great; (iii) The contract can effectively achieve coordinated supply chain, and improve carbon abatement investment.

  16. Access to primary care for socio-economically disadvantaged older people in rural areas: A qualitative study.

    PubMed

    Ford, John A; Turley, Rachel; Porter, Tom; Shakespeare, Tom; Wong, Geoff; Jones, Andy P; Steel, Nick

    2018-01-01

    We aim to explore the barriers to accessing primary care for socio-economically disadvantaged older people in rural areas. Using a community recruitment strategy, fifteen people over 65 years, living in a rural area, and receiving financial support were recruited for semi-structured interviews. Four focus groups were held with rural health professionals. Interviews and focus groups were audio-recorded and transcribed. Thematic analysis was used to identify barriers to primary care access. Older people's experience can be understood within the context of a patient perceived set of unwritten rules or social contract-an individual is careful not to bother the doctor in return for additional goodwill when they become unwell. However, most found it difficult to access primary care due to engaged telephone lines, availability of appointments, interactions with receptionists; breaching their perceived social contract. This left some feeling unwelcome, worthless or marginalised, especially those with high expectations of the social contract or limited resources, skills and/or desire to adapt to service changes. Health professionals' described how rising demands and expectations coupled with service constraints had necessitated service development, such as fewer home visits, more telephone consultations, triaging calls and modifying the appointment system. Multiple barriers to accessing primary care exist for this group. As primary care is re-organised to reduce costs, commissioners and practitioners must not lose sight of the perceived social contract and models of care that form the basis of how many older people interact with the service.

  17. 7 CFR 52.82 - Basis of survey and plant inspection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 2 2011-01-01 2011-01-01 false Basis of survey and plant inspection. 52.82 Section 52... PROCESSED FOOD PRODUCTS 1 Regulations Governing Inspection and Certification Requirements for Plants to Be Approved and for Plants Using Contract In-Plant Inspection Services 1 § 52.82 Basis of survey and plant...

  18. 48 CFR 245.7302-4 - Basis for sale.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Basis for sale. 245.7302-4..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Sale of Surplus Contractor Inventory 245.7302-4 Basis for sale. (a) Unit price basis—requires the offeror to state the bid price in terms of the...

  19. An Herbal Derivative as the Basis for a New Approach to Treating Post-Traumatic Osteoarthritis

    DTIC Science & Technology

    2016-09-01

    AWARD NUMBER: W81XWH-15-1-0397 TITLE: An Herbal Derivative as the Basis for a New Approach to Treating Post- Traumatic Osteoarthritis...SUBTITLE An Herbal Derivative as the Basis for a New Approach to Treating Post- Traumatic Osteoarthritis 5a. CONTRACT NUMBER 5b. GRANT NUMBER

  20. 41 CFR 102-74.140 - On what basis does the Administrator select construction and alteration projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Asset Services § 102-74.140 On what basis... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false On what basis does the...

  1. 45 CFR 98.46 - Nondiscrimination in admissions on the basis of religion.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... religion. 98.46 Section 98.46 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION... Requirements § 98.46 Nondiscrimination in admissions on the basis of religion. (a) Child care providers (other... contracts under the CCDF shall not discriminate in admissions against any child on the basis of religion. (b...

  2. 45 CFR 98.46 - Nondiscrimination in admissions on the basis of religion.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... religion. 98.46 Section 98.46 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION... Requirements § 98.46 Nondiscrimination in admissions on the basis of religion. (a) Child care providers (other... contracts under the CCDF shall not discriminate in admissions against any child on the basis of religion. (b...

  3. 45 CFR 98.46 - Nondiscrimination in admissions on the basis of religion.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... religion. 98.46 Section 98.46 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION... Requirements § 98.46 Nondiscrimination in admissions on the basis of religion. (a) Child care providers (other... contracts under the CCDF shall not discriminate in admissions against any child on the basis of religion. (b...

  4. 45 CFR 98.46 - Nondiscrimination in admissions on the basis of religion.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... religion. 98.46 Section 98.46 Public Welfare Department of Health and Human Services GENERAL ADMINISTRATION... Requirements § 98.46 Nondiscrimination in admissions on the basis of religion. (a) Child care providers (other... contracts under the CCDF shall not discriminate in admissions against any child on the basis of religion. (b...

  5. 45 CFR 98.46 - Nondiscrimination in admissions on the basis of religion.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... religion. 98.46 Section 98.46 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION... Requirements § 98.46 Nondiscrimination in admissions on the basis of religion. (a) Child care providers (other... contracts under the CCDF shall not discriminate in admissions against any child on the basis of religion. (b...

  6. 13 CFR 126.604 - Who decides if a contract opportunity for HUBZone set-aside competition exists?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Who decides if a contract opportunity for HUBZone set-aside competition exists? 126.604 Section 126.604 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION HUBZONE PROGRAM Contractual Assistance § 126.604 Who decides if a contract...

  7. 26 CFR 1.818-4 - Election with respect to life insurance reserves computed on preliminary term basis.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... reserves for all such contracts had been computed on a net level premium basis (using the same mortality or... portion of such reserves during the taxable year by actually changing to a net level premium basis in... a net level premium basis for the purpose of determining the amount which may be taken into account...

  8. 41 CFR 101-4.305 - Preference in admission.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Discrimination on the Basis of Sex... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Preference in admission. 101-4.305 Section 101-4.305 Public Contracts and Property Management Federal Property Management...

  9. 41 CFR 101-4.140 - Dissemination of policy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Dissemination of policy. 101-4.140 Section 101-4.140 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  10. 41 CFR 101-4.305 - Preference in admission.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Discrimination on the Basis of Sex... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Preference in admission. 101-4.305 Section 101-4.305 Public Contracts and Property Management Federal Property Management...

  11. 41 CFR 101-4.140 - Dissemination of policy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Dissemination of policy. 101-4.140 Section 101-4.140 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  12. 41 CFR 101-4.305 - Preference in admission.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Discrimination on the Basis of Sex... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Preference in admission. 101-4.305 Section 101-4.305 Public Contracts and Property Management Federal Property Management...

  13. 41 CFR 101-4.140 - Dissemination of policy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Dissemination of policy. 101-4.140 Section 101-4.140 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  14. 41 CFR 101-4.140 - Dissemination of policy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Dissemination of policy. 101-4.140 Section 101-4.140 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  15. 41 CFR 101-4.305 - Preference in admission.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Discrimination on the Basis of Sex... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Preference in admission. 101-4.305 Section 101-4.305 Public Contracts and Property Management Federal Property Management...

  16. 41 CFR 101-4.305 - Preference in admission.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Discrimination on the Basis of Sex... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Preference in admission. 101-4.305 Section 101-4.305 Public Contracts and Property Management Federal Property Management...

  17. 48 CFR 970.0371-7 - Outside employment of contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business.... Employees of a management and operating contractor are entitled to the same rights and privileges with... full or part-time basis under a DOE management and operating contract may engage in employment outside...

  18. 48 CFR 49.206-2 - Bases for settlement proposals.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... construction or related professional services contract. (ii) The partial or complete termination of supply... distinguished from a lump-sum) professional services contract. (b) Total cost basis. (1) When use of the..., under the contractor's accounting system, unit costs for work in process and finished products cannot...

  19. 48 CFR 49.206-2 - Bases for settlement proposals.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... construction or related professional services contract. (ii) The partial or complete termination of supply... distinguished from a lump-sum) professional services contract. (b) Total cost basis. (1) When use of the..., under the contractor's accounting system, unit costs for work in process and finished products cannot...

  20. 48 CFR 49.206-2 - Bases for settlement proposals.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... construction or related professional services contract. (ii) The partial or complete termination of supply... distinguished from a lump-sum) professional services contract. (b) Total cost basis. (1) When use of the..., under the contractor's accounting system, unit costs for work in process and finished products cannot...

  1. 48 CFR 49.206-2 - Bases for settlement proposals.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... construction or related professional services contract. (ii) The partial or complete termination of supply... distinguished from a lump-sum) professional services contract. (b) Total cost basis. (1) When use of the..., under the contractor's accounting system, unit costs for work in process and finished products cannot...

  2. 14 CFR 255.5 - Contracts with participating carriers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS AIRLINE COMPUTER RESERVATIONS SYSTEMS § 255.5 Contracts with participating carriers. (a) No system may require a carrier to maintain any particular level of participation or buy any enhancements in its system on the basis of participation levels or enhancements selected by...

  3. 14 CFR 255.5 - Contracts with participating carriers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS AIRLINE COMPUTER RESERVATIONS SYSTEMS § 255.5 Contracts with participating carriers. (a) No system may require a carrier to maintain any particular level of participation or buy any enhancements in its system on the basis of participation levels or enhancements selected by...

  4. 36 CFR 223.103 - Award of small business set-aside sales.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Award of small business set... PRODUCTS Timber Sale Contracts Award of Contracts § 223.103 Award of small business set-aside sales. If timber is advertised as set aside for competitive bidding by small business concerns, award will be made...

  5. 36 CFR 223.103 - Award of small business set-aside sales.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Award of small business set... PRODUCTS Timber Sale Contracts Award of Contracts § 223.103 Award of small business set-aside sales. If timber is advertised as set aside for competitive bidding by small business concerns, award will be made...

  6. 36 CFR 223.103 - Award of small business set-aside sales.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Award of small business set... PRODUCTS Timber Sale Contracts Award of Contracts § 223.103 Award of small business set-aside sales. If timber is advertised as set aside for competitive bidding by small business concerns, award will be made...

  7. 36 CFR 223.103 - Award of small business set-aside sales.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Award of small business set... PRODUCTS Timber Sale Contracts Award of Contracts § 223.103 Award of small business set-aside sales. If timber is advertised as set aside for competitive bidding by small business concerns, award will be made...

  8. 48 CFR 6.203 - Set-asides for small business concerns.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 6.203 Set-asides for small business concerns. (a) To fulfill the statutory requirements relating to small business concerns, contracting officers may set aside solicitations to allow only such business concerns to compete. This includes contract actions conducted under the Small Business Innovation Research...

  9. 48 CFR 6.203 - Set-asides for small business concerns.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 6.203 Set-asides for small business concerns. (a) To fulfill the statutory requirements relating to small business concerns, contracting officers may set aside solicitations to allow only such business concerns to compete. This includes contract actions conducted under the Small Business Innovation Research...

  10. 48 CFR 6.203 - Set-asides for small business concerns.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 6.203 Set-asides for small business concerns. (a) To fulfill the statutory requirements relating to small business concerns, contracting officers may set aside solicitations to allow only such business concerns to compete. This includes contract actions conducted under the Small Business Innovation Research...

  11. 48 CFR 6.203 - Set-asides for small business concerns.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 6.203 Set-asides for small business concerns. (a) To fulfill the statutory requirements relating to small business concerns, contracting officers may set aside solicitations to allow only such business concerns to compete. This includes contract actions conducted under the Small Business Innovation Research...

  12. ON A GENERALIZED SELF-SIMILARITY IN THE p-ADIC FIELD

    NASA Astrophysics Data System (ADS)

    Mukhamedov, Farrukh; Khakimov, Otabek

    2016-08-01

    In the present paper, we introduce a new set which defines a generalized self-similar set for contractive functions {fi}i=1N on the unit ball ℤp of p-adic numbers. This set is called unconventional limit set. We prove that the unconventional limit set is compact, perfect and uniformly disconnected. Moreover, we provide an example of two contractions for which the corresponding unconventional limiting set is quasi-symmetrically equivalent to the symbolic Cantor set.

  13. JPRS Report, Science & Technology, Japan, Industrial Property Rights

    DTIC Science & Technology

    1990-11-01

    obligation to pay attention to effective management means of civil law ( contract law ) and commercial law is (Section 3, Article 254 of the Commercial...on the basis of legal principles such as contract law , (2) the action of obtaining a business secret, without illegal activities, and breach of...SCIENCE & TECHNOLOGY POLICY 21 3. Trend of the International Debate information mainly by contract law and the illegal prac- tices law of the Civil Code

  14. Third-Party Protest Regime and GAO Protest Statistics: DoD vs. Other Federal Agencies

    DTIC Science & Technology

    2009-04-01

    collectively mark a critical and fundamental shift in the procurement system. This shift results in the divergence of government contract law from...private contract law .17 The discretion and deference afforded executive agencies by the judiciary in procurement decisions no longer resembled...the district courts’ Scanwell jurisdiction on the basis that it would promote the development of a more uniform body of contract law while increasing

  15. 48 CFR 9.405 - Effect of listing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contractors. (b) Contractors included in the SAM Exclusions as having been declared ineligible on the basis of... proposals, the contracting officer shall review the SAM Exclusions. (2) Bids received from any listed... to award, the contracting officer shall again review the SAM Exclusions to ensure that no award is...

  16. 48 CFR 9.405 - Effect of listing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... contractors. (b) Contractors included in the SAM Exclusions as having been declared ineligible on the basis of... proposals, the contracting officer shall review the SAM Exclusions. (2) Bids received from any listed... to award, the contracting officer shall again review the SAM Exclusions to ensure that no award is...

  17. 41 CFR 101-25.203 - Centralized purchases by GSA.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Centralized purchases by...-Interagency Purchase Assignments § 101-25.203 Centralized purchases by GSA. GSA will exclusively, or with specified limited exceptions, make purchases and contracts on a continuing basis for articles and services...

  18. 77 FR 31868 - Notice of Submission of Proposed Information Collection to OMB; Office of Native American...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... Proposed Information Collection to OMB; Office of Native American Programs (ONAP) Training and Technical.... 552) authorizes HUD to award training and technical assistance contracts on a competitive basis. HUD intends to competitively award training and technical assistance contracts to national and regional...

  19. Jackie Cannon Learns the Importance of a Written Contract.

    ERIC Educational Resources Information Center

    Flygare, Thomas J.

    1983-01-01

    The Fifth Circuit Court of Appeals found that a Texas school superintendent, having failed to submit a written contract to the school board for execution, had no basis for holding that a property interest in employment existed. Certainty about binding obligations requires written agreements signed by both parties. (PB)

  20. 75 FR 24648 - Order Finding That the Socal Border Financial Basis Contract Traded on the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ...'') contract traded on the IntercontinentalExchange, Inc. (``ICE''), an exempt commercial market (``ECM... (``Reauthorization Act'') \\3\\ significantly broadened the CFTC's regulatory authority with respect to ECMs by creating, in section 2(h)(7) of the CEA, a new regulatory category-- [[Page 24649

  1. Is The Modern Lease a Contract or a Conveyance?--A Historical Inquiry

    ERIC Educational Resources Information Center

    Siegel, Stephen A.

    1975-01-01

    Argues that "contrary to conventional wisdom, current landlord-tenant law is modern, commercial, and already grounded in contract doctrine." Discusses the origins of the doctrines most frequently cited as illustrations of leasings property basis and redevelops the role of property law in adjudicating leasing disputes. (JT)

  2. 41 CFR 101-4.100 - Purpose and effective date.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Purpose and effective date. 101-4.100 Section 101-4.100 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  3. 41 CFR 101-4.125 - Effect of other requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Effect of other requirements. 101-4.125 Section 101-4.125 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  4. 41 CFR 101-4.455 - Textbooks and curricular material.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Textbooks and curricular material. 101-4.455 Section 101-4.455 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  5. 41 CFR 101-4.435 - Employment assistance to students.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Employment assistance to students. 101-4.435 Section 101-4.435 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  6. 41 CFR 101-4.130 - Effect of employment opportunities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Effect of employment opportunities. 101-4.130 Section 101-4.130 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  7. 48 CFR 39.204 - Exceptions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... requirements in 39.203 do not apply to EIT that— (a) Is purchased in accordance with Subpart 13.2 (micro-purchases) prior to April 1, 2005. However, for micro-purchases, contracting officers and other individuals... writing the basis for an undue burden decision and provide the documentation to the contracting officer...

  8. An Herbal Derivative as the Basis for a New Approach to Treating Post Traumatic Osteoarthritis

    DTIC Science & Technology

    2016-09-01

    AWARD NUMBER: W81XWH-15-1-0396 TITLE: An Herbal Derivative as the Basis for a New Approach to Treating Post- Traumatic Osteoarthritis...TITLE AND SUBTITLE An Herbal Derivative as the Basis for a New Approach to Treating Post- Traumatic Osteoarthritis 5a. CONTRACT NUMBER 5b. GRANT NUMBER

  9. U.S. Federal Discrimination Law and Language and Culture Restrictions in K-12 Private Schools

    ERIC Educational Resources Information Center

    Mawdsley, Ralph; Cumming, Joy

    2013-01-01

    Section 1981 prohibits discrimination concerning the right to contract, and Title VI prohibits discrimination on the basis of the basis of race and national origin. The two cases that form the basis for the discussion in this article--"Silva v. St. Anne Catholic School" and "Doe v. Kamehameha Schools"--address whether culture…

  10. Payment contracts in a preventive health care system: a perspective from operations management.

    PubMed

    Yaesoubi, Reza; Roberts, Stephen D

    2011-12-01

    We consider a health care system consisting of two noncooperative parties: a health purchaser (payer) and a health provider, where the interaction between the two parties is governed by a payment contract. We determine the contracts that coordinate the health purchaser-health provider relationship; i.e. the contracts that maximize the population's welfare while allowing each entity to optimize its own objective function. We show that under certain conditions (1) when the number of customers for a preventive medical intervention is verifiable, there exists a gate-keeping contract and a set of concave piecewise linear contracts that coordinate the system, and (2) when the number of customers is not verifiable, there exists a contract of bounded linear form and a set of incentive-feasible concave piecewise linear contracts that coordinate the system. Copyright © 2011 Elsevier B.V. All rights reserved.

  11. Quantum Chemistry Study of Cycloaddition Pathways for the Reaction of o-Benzyne with Fullerenes and Carbon Nanotubes

    NASA Technical Reports Server (NTRS)

    Jaffe, Richard; Han, Jie; Langhoff, Stephen R. (Technical Monitor)

    1997-01-01

    Functionalization of fullerenes via the [2+2] cycloaddition reaction with o-benzyne has been demonstrated in the laboratory. In contrast, [2+4) cycloaddition products are formed when benzyne reacts with planar polycyclic aromatic hydrocarbons. Using density functional theory (DFT) calculations with Becke's hybrid functional and small contracted gaussian basis sets, we are able to reproduce these product preferences. The objective of this work is to explore the functionalization of carbon nanotubes. We have studied o-benzyne cycloaddition products with a [14,0] single-walled nanotube. We find both the [2+2] and [2+4] adducts to be stable, with the latter product being somewhat favored.

  12. 41 CFR 102-34.285 - Where can we obtain help in setting up a maintenance program?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Where can we obtain help in setting up a maintenance program? 102-34.285 Section 102-34.285 Public Contracts and Property... obtain help in setting up a maintenance program? For help in setting up a maintenance program, contact...

  13. A Group Counseling Contract.

    ERIC Educational Resources Information Center

    Johnson, Norbert; Johnson, Sarah Campbell

    1980-01-01

    A group counseling contract was developed following American Psychological Association ethical guidelines. The contract was effective in enabling participants to quickly become involved in group process. The contract could be modified for use by group facilitators in a variety of settings. (Author)

  14. 48 CFR 731.373 - Overseas recruitment incentive.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... incentive. 731.373 Section 731.373 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With... recruitment incentives are set forth in AIDAR 731.205-70. These policies are also applicable to contracts with...

  15. Fast evaluation of solid harmonic Gaussian integrals for local resolution-of-the-identity methods and range-separated hybrid functionals.

    PubMed

    Golze, Dorothea; Benedikter, Niels; Iannuzzi, Marcella; Wilhelm, Jan; Hutter, Jürg

    2017-01-21

    An integral scheme for the efficient evaluation of two-center integrals over contracted solid harmonic Gaussian functions is presented. Integral expressions are derived for local operators that depend on the position vector of one of the two Gaussian centers. These expressions are then used to derive the formula for three-index overlap integrals where two of the three Gaussians are located at the same center. The efficient evaluation of the latter is essential for local resolution-of-the-identity techniques that employ an overlap metric. We compare the performance of our integral scheme to the widely used Cartesian Gaussian-based method of Obara and Saika (OS). Non-local interaction potentials such as standard Coulomb, modified Coulomb, and Gaussian-type operators, which occur in range-separated hybrid functionals, are also included in the performance tests. The speed-up with respect to the OS scheme is up to three orders of magnitude for both integrals and their derivatives. In particular, our method is increasingly efficient for large angular momenta and highly contracted basis sets.

  16. Fast evaluation of solid harmonic Gaussian integrals for local resolution-of-the-identity methods and range-separated hybrid functionals

    NASA Astrophysics Data System (ADS)

    Golze, Dorothea; Benedikter, Niels; Iannuzzi, Marcella; Wilhelm, Jan; Hutter, Jürg

    2017-01-01

    An integral scheme for the efficient evaluation of two-center integrals over contracted solid harmonic Gaussian functions is presented. Integral expressions are derived for local operators that depend on the position vector of one of the two Gaussian centers. These expressions are then used to derive the formula for three-index overlap integrals where two of the three Gaussians are located at the same center. The efficient evaluation of the latter is essential for local resolution-of-the-identity techniques that employ an overlap metric. We compare the performance of our integral scheme to the widely used Cartesian Gaussian-based method of Obara and Saika (OS). Non-local interaction potentials such as standard Coulomb, modified Coulomb, and Gaussian-type operators, which occur in range-separated hybrid functionals, are also included in the performance tests. The speed-up with respect to the OS scheme is up to three orders of magnitude for both integrals and their derivatives. In particular, our method is increasingly efficient for large angular momenta and highly contracted basis sets.

  17. Designing and assessing weather-based financial hedging contracts to mitigate water conflicts at the river basin scale. A case study in the Italian Alps

    NASA Astrophysics Data System (ADS)

    Bellagamba, Laura; Denaro, Simona; Kern, Jordan; Giuliani, Matteo; Castelletti, Andrea; Characklis, Gregory

    2016-04-01

    Growing water demands and more frequent and severe droughts are increasingly challenging water management in many regions worldwide, exacerbating water disputes and reducing the space for negotiated agreements at the catchment scale. In the lack of a centralized controller, the design and deployment of coordination and/or regulatory mechanisms is a way to improve system-wide efficiency while preserving the distributed nature of the decision making setting, and facilitating cooperation among institutionally independent decision-makers. Recent years have witnessed an increased interest in index-based insurance contracts as mechanisms for sharing hydro-meteorological risk in complex and heterogeneous decision making context (e.g. multiple stakeholders and institutionally independent decision makers). In this study, we explore the potential for index-based insurance contracts to mitigate the conflict in a water system characterized by (political) power asymmetry between hydropower companies upstream and farmers downstream. The Lake Como basin in the Italian Alps is considered as a case study. We generated alternative regulatory mechanisms in the form of minimum release constraints to the hydropower facilities, and designed an insurance contract for hedging against hydropower relative revenue losses. The fundamental step in designing this type of insurance contracts is the identification of a suitable index, which triggers the payouts as well as the payout function, defined by strike level and slope (e.g., euros/index unit). A portfolio of index-based contracts was designed for the case study and evaluated in terms of revenue floor, basis risk and revenue fluctuation around the mean, both with and without insurance. Over the long term, the insurance proved to be capable to keep the minimum revenue above a specified level while providing a greater certainty on the revenue trend. This result shows the possibility to augment farmer's supply with little loss for hydropower companies, thus helping in mitigating the conflict between the stakeholders.

  18. 25 CFR 900.68 - Will this uniform data set be required of all Indian tribe or tribal organizations contracting...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 2 2014-04-01 2014-04-01 false Will this uniform data set be required of all Indian... Reports and Data Requirements § 900.68 Will this uniform data set be required of all Indian tribe or tribal organizations contracting with the IHS under the Act? No. The uniform data set, applicable to the...

  19. 25 CFR 900.68 - Will this uniform data set be required of all Indian tribe or tribal organizations contracting...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 2 2011-04-01 2011-04-01 false Will this uniform data set be required of all Indian... Reports and Data Requirements § 900.68 Will this uniform data set be required of all Indian tribe or tribal organizations contracting with the IHS under the Act? No. The uniform data set, applicable to the...

  20. 25 CFR 900.68 - Will this uniform data set be required of all Indian tribe or tribal organizations contracting...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Will this uniform data set be required of all Indian... Reports and Data Requirements § 900.68 Will this uniform data set be required of all Indian tribe or tribal organizations contracting with the IHS under the Act? No. The uniform data set, applicable to the...

  1. 25 CFR 900.68 - Will this uniform data set be required of all Indian tribe or tribal organizations contracting...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false Will this uniform data set be required of all Indian... Reports and Data Requirements § 900.68 Will this uniform data set be required of all Indian tribe or tribal organizations contracting with the IHS under the Act? No. The uniform data set, applicable to the...

  2. 25 CFR 900.68 - Will this uniform data set be required of all Indian tribe or tribal organizations contracting...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false Will this uniform data set be required of all Indian... Reports and Data Requirements § 900.68 Will this uniform data set be required of all Indian tribe or tribal organizations contracting with the IHS under the Act? No. The uniform data set, applicable to the...

  3. 43 CFR Appendix A to Subpart F of... - Contract Provisions

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... to laborers and mechanics at a rate not less than the minimum wages specified in a wage determination... other contracts that involve the employment of mechanics or laborers shall include a provision for..., each contractor shall be required to compute the wages of every mechanic and laborer on the basis of a...

  4. 28 CFR Appendix A to Part 70 - Contract Provisions

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... laborers and mechanics at a rate not less than the minimum wages specified in a wage determination made by... other contracts that involve the employment of mechanics or laborers must include a provision for..., each contractor is required to compute the wages of every mechanic and laborer on the basis of a...

  5. 43 CFR Appendix A to Subpart F of... - Contract Provisions

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... to laborers and mechanics at a rate not less than the minimum wages specified in a wage determination... other contracts that involve the employment of mechanics or laborers shall include a provision for..., each contractor shall be required to compute the wages of every mechanic and laborer on the basis of a...

  6. 29 CFR Appendix A to Part 95 - Contract Provisions

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Construction”). Under this Act, contractors shall be required to pay wages to laborers and mechanics at a rate... contracts that involve the employment of mechanics or laborers shall include a provision for compliance with... shall be required to compute the wages of every mechanic and laborer on the basis of a standard work...

  7. 28 CFR Appendix A to Part 70 - Contract Provisions

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... laborers and mechanics at a rate not less than the minimum wages specified in a wage determination made by... other contracts that involve the employment of mechanics or laborers must include a provision for..., each contractor is required to compute the wages of every mechanic and laborer on the basis of a...

  8. 24 CFR Appendix A to Part 84 - Contract Provisions

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... to laborers and mechanics at a rate not less than the minimum wages specified in a wage determination... other contracts that involve the employment of mechanics or laborers shall include a provision for..., each contractor shall be required to compute the wages of every mechanic and laborer on the basis of a...

  9. 40 CFR Appendix to Part 30 - Contract Provisions

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... to laborers and mechanics at a rate not less than the minimum wages specified in a wage determination... contracts that involve the employment of mechanics or laborers shall include a provision for compliance with... shall be required to compute the wages of every mechanic and laborer on the basis of a standard work...

  10. 29 CFR Appendix A to Part 95 - Contract Provisions

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Construction”). Under this Act, contractors shall be required to pay wages to laborers and mechanics at a rate... contracts that involve the employment of mechanics or laborers shall include a provision for compliance with... shall be required to compute the wages of every mechanic and laborer on the basis of a standard work...

  11. 29 CFR Appendix A to Part 95 - Contract Provisions

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Construction”). Under this Act, contractors shall be required to pay wages to laborers and mechanics at a rate... contracts that involve the employment of mechanics or laborers shall include a provision for compliance with... shall be required to compute the wages of every mechanic and laborer on the basis of a standard work...

  12. 28 CFR Appendix A to Part 70 - Contract Provisions

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... laborers and mechanics at a rate not less than the minimum wages specified in a wage determination made by... other contracts that involve the employment of mechanics or laborers must include a provision for..., each contractor is required to compute the wages of every mechanic and laborer on the basis of a...

  13. 48 CFR 31.107 - Contracts with State, local, and federally recognized Indian tribal governments.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... to contracts with State, local, and federally recognized Indian tribal governments. They provide the basis for a uniform approach to the problem of determining costs and to promote efficiency and better... requirements promulgated by the sponsoring Government agencies. (b) The Office of Management and Budget will...

  14. 40 CFR Appendix to Part 30 - Contract Provisions

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... to laborers and mechanics at a rate not less than the minimum wages specified in a wage determination... contracts that involve the employment of mechanics or laborers shall include a provision for compliance with... shall be required to compute the wages of every mechanic and laborer on the basis of a standard work...

  15. 24 CFR Appendix A to Part 84 - Contract Provisions

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... to laborers and mechanics at a rate not less than the minimum wages specified in a wage determination... other contracts that involve the employment of mechanics or laborers shall include a provision for..., each contractor shall be required to compute the wages of every mechanic and laborer on the basis of a...

  16. 24 CFR Appendix A to Part 84 - Contract Provisions

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... to laborers and mechanics at a rate not less than the minimum wages specified in a wage determination... other contracts that involve the employment of mechanics or laborers shall include a provision for..., each contractor shall be required to compute the wages of every mechanic and laborer on the basis of a...

  17. 40 CFR Appendix to Part 30 - Contract Provisions

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... to laborers and mechanics at a rate not less than the minimum wages specified in a wage determination... contracts that involve the employment of mechanics or laborers shall include a provision for compliance with... shall be required to compute the wages of every mechanic and laborer on the basis of a standard work...

  18. 30 CFR 1206.301 - Value basis for royalty computation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) The gross value for royalty purposes shall be the sale or contract unit price times the number of units sold, Provided, however, That where the authorized officer determines: (1) That a contract of sale... whole or in part upon considerations other than the value of the commodities, or (2) That no bona fide...

  19. 30 CFR 1206.301 - Value basis for royalty computation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) The gross value for royalty purposes shall be the sale or contract unit price times the number of units sold, Provided, however, That where the authorized officer determines: (1) That a contract of sale... whole or in part upon considerations other than the value of the commodities, or (2) That no bona fide...

  20. 30 CFR 1206.301 - Value basis for royalty computation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) The gross value for royalty purposes shall be the sale or contract unit price times the number of units sold, Provided, however, That where the authorized officer determines: (1) That a contract of sale... whole or in part upon considerations other than the value of the commodities, or (2) That no bona fide...

  1. 30 CFR 206.301 - Value basis for royalty computation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... gross value for royalty purposes shall be the sale or contract unit price times the number of units sold, Provided, however, That where the authorized officer determines: (1) That a contract of sale or other... lease is not a bona fide transaction between independent parties because it is based in whole or in part...

  2. 75 FR 24619 - Order Finding That the Permian Financial Basis Contract Traded on the IntercontinentalExchange...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ...'') contract traded on the IntercontinentalExchange, Inc. (``ICE''), an exempt commercial market (``ECM...\\ significantly broadened the CFTC's regulatory authority with respect to ECMs by creating, in section 2(h)(7) of the CEA, a new regulatory category--ECMs on which significant price [[Page 24620

  3. 23 CFR Appendix B to Subpart A of... - Training Special Provisions

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the event that a contractor subcontracts a portion of the contract work, he shall determine how many... among the work classifications on the basis of the contractor's needs and the availability of journeymen... each trainee employed by him on the contract work who is currently enrolled or becomes enrolled in an...

  4. 23 CFR Appendix B to Subpart A of... - Training Special Provisions

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the event that a contractor subcontracts a portion of the contract work, he shall determine how many... among the work classifications on the basis of the contractor's needs and the availability of journeymen... each trainee employed by him on the contract work who is currently enrolled or becomes enrolled in an...

  5. 25 CFR 900.145 - On what basis may the Secretary deny a waiver request?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND... written finding. The finding must clearly demonstrate (or be supported by controlling legal authority... resources is not assured; (c) The proposed project or function to be contracted for cannot be properly...

  6. 41 CFR 101-4.455 - Textbooks and curricular material.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Textbooks and curricular material. 101-4.455 Section 101-4.455 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES...

  7. The Technology Refresh Program: Affording State-of-the Art Personal Computing.

    ERIC Educational Resources Information Center

    Spiwak, Rand

    2000-01-01

    Describes the Florida Community College Technology Refresh Program in which 28 Florida community colleges refresh their personal computer technology on a three-year cyclical basis through negotiation of a contract with Dell Computer Corporation. Discusses the contract highlights (such as a 22.5 percent discount on personal computers and on-site…

  8. The Effects of Proposition 209 on California: Higher Education, Public Employment, and Contracting

    ERIC Educational Resources Information Center

    Geshekter, Charles L.

    2008-01-01

    In 1996, Californians overwhelmingly approved Proposition 209, which prohibited all state agencies from discriminating on the basis of race, ethnicity, or gender in university admissions, public employment, or competition for a state contract. Opponents of Proposition 209 predicted dire consequences for California's ethnic minorities and women if…

  9. 48 CFR 19.707 - The Small Business Administration's role in carrying out the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Administration's role in carrying out the program. 19.707 Section 19.707 Federal Acquisition Regulations System... Subcontracting Program 19.707 The Small Business Administration's role in carrying out the program. (a) Under the... nature; and (4) Evaluate compliance with subcontracting plans, either on a contract-by-contract basis, or...

  10. 48 CFR 237.7101 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... clause at 252.237-7015, Loss or Damage (Weight of Articles), in solicitations and contracts for laundry..., Instruction to Offerors (Bulk Weight), in solicitations for laundry services to be provided on a bulk weight basis. (c) Use the clause at 252.237-7014, Loss or Damage (Count-of-Articles), in solicitations and...

  11. 7 CFR 634.27 - Cost-share payment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.27 Cost-share... essential for meeting the water quality objectives in the project area. (c) Basis for cost-share payment. (1...) Average cost, or (ii) Actual cost not to exceed average cost. (2) If the average cost at the time of...

  12. 7 CFR 634.27 - Cost-share payment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.27 Cost-share... essential for meeting the water quality objectives in the project area. (c) Basis for cost-share payment. (1...) Average cost, or (ii) Actual cost not to exceed average cost. (2) If the average cost at the time of...

  13. 7 CFR 634.27 - Cost-share payment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.27 Cost-share... essential for meeting the water quality objectives in the project area. (c) Basis for cost-share payment. (1...) Average cost, or (ii) Actual cost not to exceed average cost. (2) If the average cost at the time of...

  14. 7 CFR 634.27 - Cost-share payment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.27 Cost-share... essential for meeting the water quality objectives in the project area. (c) Basis for cost-share payment. (1...) Average cost, or (ii) Actual cost not to exceed average cost. (2) If the average cost at the time of...

  15. 7 CFR 634.27 - Cost-share payment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.27 Cost-share... essential for meeting the water quality objectives in the project area. (c) Basis for cost-share payment. (1...) Average cost, or (ii) Actual cost not to exceed average cost. (2) If the average cost at the time of...

  16. Systemic inflammatory responses to maximal versus submaximal lengthening contractions of the elbow flexors.

    PubMed

    Peake, Jonathan M; Nosaka, Kazunori; Muthalib, Makii; Suzuki, Katsuhiko

    2006-01-01

    We compared changes in markers of muscle damage and systemic inflammation after submaximal and maximal lengthening muscle contractions of the elbow flexors. Using a cross-over design, 10 healthy young men not involved in resistance training completed a submaximal trial (10 sets of 60 lengthening contractions at 10% maximum isometric strength, 1 min rest between sets), followed by a maximal trial (10 sets of three lengthening contractions at 100% maximum isometric strength, 3 min rest between sets). Lengthening contractions were performed on an isokinetic dynamometer. Opposite arms were used for the submaximal and maximal trials, and the trials were separated by a minimum of two weeks. Blood was sampled before, immediately after, 1 h, 3 h, and 1-4 d after each trial. Total leukocyte and neutrophil numbers, and the serum concentration of soluble tumor necrosis factor-alpha receptor 1 were elevated after both trials (P < 0.01), but there were no differences between the trials. Serum IL-6 concentration was elevated 3 h after the submaximal contractions (P < 0.01). The concentrations of serum tumor necrosis factor-alpha, IL-1 receptor antagonist, IL-10, granulocyte-colony stimulating factor and plasma C-reactive protein remained unchanged following both trials. Maximum isometric strength and range of motion decreased significantly (P < 0.001) after both trials, and were lower from 1-4 days after the maximal contractions compared to the submaximal contractions. Plasma myoglobin concentration and creatine kinase activity, muscle soreness and upper arm circumference all increased after both trials (P < 0.01), but were not significantly different between the trials. Therefore, there were no differences in markers of systemic inflammation, despite evidence of greater muscle damage following maximal versus submaximal lengthening contractions of the elbow flexors.

  17. 36 CFR 223.64 - Appraisal on a lump-sum value or rate per unit of measure basis.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... costs or selling values subsequent to the rate redetermination which reduce conversion value to less... or rate per unit of measure basis. 223.64 Section 223.64 Parks, Forests, and Public Property FOREST... Contracts Appraisal and Pricing § 223.64 Appraisal on a lump-sum value or rate per unit of measure basis...

  18. Basis sets for the calculation of core-electron binding energies

    NASA Astrophysics Data System (ADS)

    Hanson-Heine, Magnus W. D.; George, Michael W.; Besley, Nicholas A.

    2018-05-01

    Core-electron binding energies (CEBEs) computed within a Δ self-consistent field approach require large basis sets to achieve convergence with respect to the basis set limit. It is shown that supplementing a basis set with basis functions from the corresponding basis set for the element with the next highest nuclear charge (Z + 1) provides basis sets that give CEBEs close to the basis set limit. This simple procedure provides relatively small basis sets that are well suited for calculations where the description of a core-ionised state is important, such as time-dependent density functional theory calculations of X-ray emission spectroscopy.

  19. 48 CFR 2009.570-5 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-5 Contract clauses. (a) General contract clause. All contracts and simplified acquisitions of the types set forth in 2009.570-4(b) must include the clause entitled, “Contractor Organizational Conflicts of...

  20. 48 CFR 731.774 - Overseas recruitment incentive.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... incentive. 731.774 Section 731.774 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Nonprofit... are set forth in AIDAR 731.205-70. These policies are also applicable to contracts with a nonprofit...

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Papajak, Ewa; Truhlar, Donald G.

    We present sets of convergent, partially augmented basis set levels corresponding to subsets of the augmented “aug-cc-pV(n+d)Z” basis sets of Dunning and co-workers. We show that for many molecular properties a basis set fully augmented with diffuse functions is computationally expensive and almost always unnecessary. On the other hand, unaugmented cc-pV(n+d)Z basis sets are insufficient for many properties that require diffuse functions. Therefore, we propose using intermediate basis sets. We developed an efficient strategy for partial augmentation, and in this article, we test it and validate it. Sequentially deleting diffuse basis functions from the “aug” basis sets yields the “jul”,more » “jun”, “may”, “apr”, etc. basis sets. Tests of these basis sets for Møller-Plesset second-order perturbation theory (MP2) show the advantages of using these partially augmented basis sets and allow us to recommend which basis sets offer the best accuracy for a given number of basis functions for calculations on large systems. Similar truncations in the diffuse space can be performed for the aug-cc-pVxZ, aug-cc-pCVxZ, etc. basis sets.« less

  2. Electromyographic analysis of a modified maneuver for quadriceps femoris muscle setting with co-contraction of the hamstrings.

    PubMed

    Nakajima, Masaaki; Kawamura, Kenji; Takeda, Isao

    2003-05-01

    A "quadriceps femoris muscle setting" is isometric quadriceps femoris exercise which can be widely used in early knee rehabilitation. However this exercise cannot obtain enough co-contraction of the hamstrings. Isolated quadriceps femoris contraction in knee extension imposes severe strain to anterior cruciate ligament. We succeeded in developing a simple training maneuver that is effective in obtaining co-contraction of the hamstrings--a modified maneuver for the quadriceps femoris muscle setting with the contralateral lower limb raised (MQS). In this study, we analyzed the effect of this maneuver by EMG quantification. Twenty-eight healthy young adult men performed sequential trials consisting of normal quadriceps femoris muscle setting (NQS) and MQS. Electromyographic activity was recorded from surface electrodes on the gluteus maximus, vastus medialis, rectus femoris, vastus lateralis, semitendinosus and biceps femoris (long head), and normalized to values derived from maximal isometric trials. The % maximal voluntary isometric contraction (%MVIC) of the vastus medialis, vastus lateralis and rectus femoris did not vary in the each maneuver. However, the %MVIC of the hamstrings varied significantly in the MQS. This study suggests that effective co-contraction of the hamstrings can be obtained in MQS by adjusting the load to the raised lower limb.

  3. Navy DD(X) and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress

    DTIC Science & Technology

    2004-10-28

    NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Defense Acquisition University David D. Acker Library...program, it had decided to award the contract for the next phase on a sole-source basis to NGSS . The Navy has also stated that “The ship construction...contracts will be allocated equally between NGSS and BIW for the first six ships... and will be Cost Plus Incentive Fee (CPIF) type contracts.... The

  4. Estimating the CCSD basis-set limit energy from small basis sets: basis-set extrapolations vs additivity schemes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spackman, Peter R.; Karton, Amir, E-mail: amir.karton@uwa.edu.au

    Coupled cluster calculations with all single and double excitations (CCSD) converge exceedingly slowly with the size of the one-particle basis set. We assess the performance of a number of approaches for obtaining CCSD correlation energies close to the complete basis-set limit in conjunction with relatively small DZ and TZ basis sets. These include global and system-dependent extrapolations based on the A + B/L{sup α} two-point extrapolation formula, and the well-known additivity approach that uses an MP2-based basis-set-correction term. We show that the basis set convergence rate can change dramatically between different systems(e.g.it is slower for molecules with polar bonds and/ormore » second-row elements). The system-dependent basis-set extrapolation scheme, in which unique basis-set extrapolation exponents for each system are obtained from lower-cost MP2 calculations, significantly accelerates the basis-set convergence relative to the global extrapolations. Nevertheless, we find that the simple MP2-based basis-set additivity scheme outperforms the extrapolation approaches. For example, the following root-mean-squared deviations are obtained for the 140 basis-set limit CCSD atomization energies in the W4-11 database: 9.1 (global extrapolation), 3.7 (system-dependent extrapolation), and 2.4 (additivity scheme) kJ mol{sup –1}. The CCSD energy in these approximations is obtained from basis sets of up to TZ quality and the latter two approaches require additional MP2 calculations with basis sets of up to QZ quality. We also assess the performance of the basis-set extrapolations and additivity schemes for a set of 20 basis-set limit CCSD atomization energies of larger molecules including amino acids, DNA/RNA bases, aromatic compounds, and platonic hydrocarbon cages. We obtain the following RMSDs for the above methods: 10.2 (global extrapolation), 5.7 (system-dependent extrapolation), and 2.9 (additivity scheme) kJ mol{sup –1}.« less

  5. Estimating the CCSD basis-set limit energy from small basis sets: basis-set extrapolations vs additivity schemes

    NASA Astrophysics Data System (ADS)

    Spackman, Peter R.; Karton, Amir

    2015-05-01

    Coupled cluster calculations with all single and double excitations (CCSD) converge exceedingly slowly with the size of the one-particle basis set. We assess the performance of a number of approaches for obtaining CCSD correlation energies close to the complete basis-set limit in conjunction with relatively small DZ and TZ basis sets. These include global and system-dependent extrapolations based on the A + B/Lα two-point extrapolation formula, and the well-known additivity approach that uses an MP2-based basis-set-correction term. We show that the basis set convergence rate can change dramatically between different systems(e.g.it is slower for molecules with polar bonds and/or second-row elements). The system-dependent basis-set extrapolation scheme, in which unique basis-set extrapolation exponents for each system are obtained from lower-cost MP2 calculations, significantly accelerates the basis-set convergence relative to the global extrapolations. Nevertheless, we find that the simple MP2-based basis-set additivity scheme outperforms the extrapolation approaches. For example, the following root-mean-squared deviations are obtained for the 140 basis-set limit CCSD atomization energies in the W4-11 database: 9.1 (global extrapolation), 3.7 (system-dependent extrapolation), and 2.4 (additivity scheme) kJ mol-1. The CCSD energy in these approximations is obtained from basis sets of up to TZ quality and the latter two approaches require additional MP2 calculations with basis sets of up to QZ quality. We also assess the performance of the basis-set extrapolations and additivity schemes for a set of 20 basis-set limit CCSD atomization energies of larger molecules including amino acids, DNA/RNA bases, aromatic compounds, and platonic hydrocarbon cages. We obtain the following RMSDs for the above methods: 10.2 (global extrapolation), 5.7 (system-dependent extrapolation), and 2.9 (additivity scheme) kJ mol-1.

  6. Independent sector treatment centres: the first independent evaluation, a Scottish case study

    PubMed Central

    Pollock, Allyson M; Kirkwood, Graham

    2009-01-01

    Summary Objectives The £5 billion English Independent Sector Treatment Centre (ISTC) programme remains unevaluated because of a lack of published contract data and poor quality data returns. Scotland has a three-year pilot ISTC, the Scottish Regional Treatment Centre (SRTC), the contract for which is now in the public domain. This study aims to conduct an independent evaluation of the performance of the SRTC during the first year of operation. Design A retrospective analysis of the SRTC comparing activity as reported by hospital episode statistics returned to ISD Scotland with: volume and cost data in the SRTC contract; a 10-month audit carried out by management consultants Price Waterhouse Coopers (PWC); and an internal NHS Tayside performance report. Setting All day-case and inpatient activity at the SRTC from 1 December 2006 to 31 January 2008. Main outcome measures Activity and cost. Results The annual contract was based on patient referrals to the SRTC and not actual treatments. The contract was awarded on the basis of 2624 referrals a year, total value of £5,667,464. According to ISD data, the SRTC performed 831 procedures (32% of annual contract) in the first 13 months worth £1,035,603 (18%). PWC's figures report 2200 referrals (84%) to the SRTC at a cost of 2,642,000 (47%) in the first 10 months. Conclusions Basing the SRTC contract on payments for referrals rather than actual treatment represents a major departure from normal standards of reporting and commissioning and may have resulted in over-payment for referrals for patients who did not receive treatment of up to £3 million in the first 10 months. The PWC report falls well below the standards one would expect of an independent evaluation and we were unable to validate PWC's analysis and the claim of value for money. If wave-one ISTCs in England perform similarly to the SRTC then as much as £927 million may have been paid for patients who did not receive treatment. We recommend a moratorium on all ISTC contracts until the contracts have been published and properly evaluated with respect to work paid for and actual work carried out and quality of care. PMID:19605859

  7. Validation of ethnopharmacological uses of Heliotropium strigosum Willd. as spasmolytic, bronchodilator and vasorelaxant remedy.

    PubMed

    Janbaz, Khalid H; Javed, Sana; Saqib, Fatima; Imran, Imran; Zia-Ul-Haq, Muhammad; De Feo, Vincenzo

    2015-06-06

    Heliotropium strigosum is used in traditional medicine to manage gastrointestinal pain, respiratory distress and vascular disorders. The present study was undertaken to provide scientific evidences for these folkloric uses by in vitro experimental settings. A crude methanol extract of the Heliotropium strigosum (Hs.Cr) was tested in vitro on isolated rabbit jejunum preparations to detect the possible presence of spasmolytic activity. Moreover, isolated rabbit tracheal and aorta preparations were used to ascertain the relaxant effects of the extract. The Hs.Cr exhibited relaxant effects in rabbit jejunum in a concentration dependent manner (0.01-3.0 mg/ml). The Hs.Cr also relaxed K(+) (80 mM)-induced spastic contractions in rabbit jejunum and shifted the Ca(2+) concentration response curves towards right. The extract relaxed carbachol (1 μM)- as well as K(+) (80 mM)-induced contractions in rabbit trachea at concentrations ranging from 0.01 to 10 mg/ml. Moreover, Hs.Cr. also relaxed (0.01-3.0 mg/ml) the phenylephrine (1 μM)- and K(+) (80 mM)-induced contractions in isolated rabbit aorta. The Hs.Cr was found to exhibit spasmolytic, bronchodilator and vasorelaxant activities on isolated rabbit jejunum, trachea and aorta preparations, likely mediated through Ca(2+) channel blockade. This finding may provide a scientific basis for the folkloric uses of the plant.

  8. Building and using a statistical 3D motion atlas for analyzing myocardial contraction in MRI

    NASA Astrophysics Data System (ADS)

    Rougon, Nicolas F.; Petitjean, Caroline; Preteux, Francoise J.

    2004-05-01

    We address the issue of modeling and quantifying myocardial contraction from 4D MR sequences, and present an unsupervised approach for building and using a statistical 3D motion atlas for the normal heart. This approach relies on a state-of-the-art variational non rigid registration (NRR) technique using generalized information measures, which allows for robust intra-subject motion estimation and inter-subject anatomical alignment. The atlas is built from a collection of jointly acquired tagged and cine MR exams in short- and long-axis views. Subject-specific non parametric motion estimates are first obtained by incremental NRR of tagged images onto the end-diastolic (ED) frame. Individual motion data are then transformed into the coordinate system of a reference subject using subject-to-reference mappings derived by NRR of cine ED images. Finally, principal component analysis of aligned motion data is performed for each cardiac phase, yielding a mean model and a set of eigenfields encoding kinematic ariability. The latter define an organ-dedicated hierarchical motion basis which enables parametric motion measurement from arbitrary tagged MR exams. To this end, the atlas is transformed into subject coordinates by reference-to-subject NRR of ED cine frames. Atlas-based motion estimation is then achieved by parametric NRR of tagged images onto the ED frame, yielding a compact description of myocardial contraction during diastole.

  9. 48 CFR 1322.604-2 - Regulatory exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Walsh-Healey Public Contracts Act... a contract or class of contracts from Walsh-Healey Act stipulations is set forth in CAM 1301.70. ...

  10. 14 CFR 198.3 - Basis of insurance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Basis of insurance. 198.3 Section 198.3 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) WAR RISK..., pursuant to a contract of the department, agency, or instrumentality; or transportation of military forces...

  11. 36 CFR § 1250.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... representative of the news media because the individual can demonstrate a solid basis for expecting publication through a news organization, even though not actually in its employ. A publication contract would be the... demonstrating this solid basis. (g) News media representative means a person actively gathering news for an...

  12. 36 CFR 1250.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... representative of the news media because the individual can demonstrate a solid basis for expecting publication through a news organization, even though not actually in its employ. A publication contract would be the... demonstrating this solid basis. (g) News media representative means a person actively gathering news for an...

  13. 36 CFR 1250.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... representative of the news media because the individual can demonstrate a solid basis for expecting publication through a news organization, even though not actually in its employ. A publication contract would be the... demonstrating this solid basis. (g) News media representative means a person actively gathering news for an...

  14. 36 CFR 1250.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... representative of the news media because the individual can demonstrate a solid basis for expecting publication through a news organization, even though not actually in its employ. A publication contract would be the... demonstrating this solid basis. (g) News media representative means a person actively gathering news for an...

  15. 7 CFR 91.45 - Charges for laboratory services on a contract basis.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... basis as will reimburse the Agricultural Marketing Service of the Department for the full cost of... that will reimburse the Agricultural Marketing Service of the Department for the full cost of rendering... MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED...

  16. 38 CFR Appendix A to Part 49 - Contract Provisions

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal awarding agency. 4. Contract Work Hours and Safety Standards Act (40 U.S.C. 327-333)—Where... the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible... hours worked in excess of 40 hours in the work week. Section 107 of the Act is applicable to...

  17. 76 FR 14548 - Federal Acquisition Regulation; Requirements for Acquisitions Pursuant to Multiple-Award Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... contract file, (ii) the estimated value of the BPA does not exceed $100 million (including any options... Request for Quotation (RFQ) to all BPA holders offering the required supplies or services under the BPA... be performed and the basis upon which the selection will be made, (ii) afford all BPA holders an...

  18. 41 CFR 101-4.425 - Counseling and use of appraisal and counseling materials.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Counseling and use of appraisal and counseling materials. 101-4.425 Section 101-4.425 Public Contracts and Property Management... Discrimination on the Basis of Sex in Education Programs or Activities Prohibited § 101-4.425 Counseling and use...

  19. 41 CFR 101-4.425 - Counseling and use of appraisal and counseling materials.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Counseling and use of appraisal and counseling materials. 101-4.425 Section 101-4.425 Public Contracts and Property Management... Discrimination on the Basis of Sex in Education Programs or Activities Prohibited § 101-4.425 Counseling and use...

  20. 41 CFR 101-4.425 - Counseling and use of appraisal and counseling materials.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Counseling and use of appraisal and counseling materials. 101-4.425 Section 101-4.425 Public Contracts and Property Management... Discrimination on the Basis of Sex in Education Programs or Activities Prohibited § 101-4.425 Counseling and use...

  1. 41 CFR 101-4.425 - Counseling and use of appraisal and counseling materials.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Counseling and use of appraisal and counseling materials. 101-4.425 Section 101-4.425 Public Contracts and Property Management... Discrimination on the Basis of Sex in Education Programs or Activities Prohibited § 101-4.425 Counseling and use...

  2. 41 CFR 101-4.425 - Counseling and use of appraisal and counseling materials.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Counseling and use of appraisal and counseling materials. 101-4.425 Section 101-4.425 Public Contracts and Property Management... Discrimination on the Basis of Sex in Education Programs or Activities Prohibited § 101-4.425 Counseling and use...

  3. 30 CFR 1206.301 - Value basis for royalty computation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... royalty computation. (a) The gross value for royalty purposes shall be the sale or contract unit price...) That a contract of sale or other business arrangement between the lessee and a purchaser of some or all... because it is based in whole or in part upon considerations other than the value of the commodities, or (2...

  4. 15 CFR 747.4 - Steps you must follow to apply for a SIRL.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... classifications, where available, as this will assist BIS to rule upon the application quickly. (2) Form BIS-748P... entity, the contract or work order which formed the basis of the transaction, and any identification number or project code for that contract or work order; (3) Explanation of how the project will...

  5. 75 FR 23679 - Order Finding That the ICE Malin Financial Basis Contract Traded on the IntercontinentalExchange...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... commercial market (``ECM'') under sections 2(h)(3)-(5) of the Commodity Exchange Act (``CEA'' or the ``Act...\\ significantly broadened the CFTC's regulatory authority with respect to ECMs by creating, in section 2(h)(7) of the CEA, a new regulatory category--ECMs on which significant price discovery contracts (``SPDCs...

  6. 75 FR 24586 - Order Finding That the San Juan Financial Basis Contract Traded on the IntercontinentalExchange...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... (``ECM'') under sections 2(h)(3)-(5) of the Commodity Exchange Act (``CEA'' or the ``Act''), performs a...\\ significantly broadened the CFTC's regulatory authority with respect to ECMs by creating, in section 2(h)(7) of the CEA, a new regulatory category--ECMs on which significant price discovery contracts (``SPDCs...

  7. No-Harm Contracts: A Review of What We Know

    ERIC Educational Resources Information Center

    Lewis, Lisa McConnell

    2007-01-01

    Few events in the practice of a mental health clinician can be as devastating as the suicide of a client. Although suicide is a rare occurrence, clinicians face assessment of clients' risk for harming themselves on a regular basis. One well-accepted and widely practiced intervention for suicidal ideation is the use of no-harm contracts (NHC),…

  8. Contractual considerations in veterinary practice.

    PubMed

    Grossman, M R; Scoggins, G A

    1993-09-01

    Veterinary medicine is a profession based on contract. Many aspects of veterinary practice involve legally enforceable contract obligations. Legal rules established by statutes or court cases govern contract formation, interpretation, and enforcement. This article explains several legal principles governing contract law and applies some of these principles to common contractual settings in veterinary medicine.

  9. Contract law for the hospital and health administrator.

    PubMed

    Bates, P W

    1986-01-01

    The author discusses the concept of a legal 'contract' and gives many examples of its application in hospitals and health settings. He describes the main features of a contract and gives special attention to personnel and clinical ramifications and to the role of agents in making contracts on behalf of hospitals.

  10. 41 CFR 101-4.420 - Access to schools operated by LEAs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Discrimination on the Basis of Sex in Education Programs or Activities Prohibited § 101-4.420 Access to schools... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Access to schools...

  11. 41 CFR 101-4.420 - Access to schools operated by LEAs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Discrimination on the Basis of Sex in Education Programs or Activities Prohibited § 101-4.420 Access to schools... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Access to schools...

  12. 41 CFR 101-4.420 - Access to schools operated by LEAs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Discrimination on the Basis of Sex in Education Programs or Activities Prohibited § 101-4.420 Access to schools... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Access to schools...

  13. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Production Planning Schedules during active production of the item and for a period of (negotiated number... Government's dependence upon the Production Planning Schedules as a basis to take appropriate measures to... intention to convert Production Planning Schedule to contracts on a selective basis, as may be required to...

  14. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Production Planning Schedules during active production of the item and for a period of (negotiated number... Government's dependence upon the Production Planning Schedules as a basis to take appropriate measures to... intention to convert Production Planning Schedule to contracts on a selective basis, as may be required to...

  15. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Production Planning Schedules during active production of the item and for a period of (negotiated number... Government's dependence upon the Production Planning Schedules as a basis to take appropriate measures to... intention to convert Production Planning Schedule to contracts on a selective basis, as may be required to...

  16. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Production Planning Schedules during active production of the item and for a period of (negotiated number... Government's dependence upon the Production Planning Schedules as a basis to take appropriate measures to... intention to convert Production Planning Schedule to contracts on a selective basis, as may be required to...

  17. 41 CFR 101-5.104-2 - Basis for determining economic feasibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... economic feasibility. 101-5.104-2 Section 101-5.104-2 Public Contracts and Property Management Federal... SERVICES IN FEDERAL BUILDINGS AND COMPLEXES 5.1-General § 101-5.104-2 Basis for determining economic feasibility. (a) Whenever possible, determination of the economic feasibility of a proposed centralized...

  18. 41 CFR 101-5.104-2 - Basis for determining economic feasibility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... economic feasibility. 101-5.104-2 Section 101-5.104-2 Public Contracts and Property Management Federal... SERVICES IN FEDERAL BUILDINGS AND COMPLEXES 5.1-General § 101-5.104-2 Basis for determining economic feasibility. (a) Whenever possible, determination of the economic feasibility of a proposed centralized...

  19. 41 CFR 101-5.104-2 - Basis for determining economic feasibility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... economic feasibility. 101-5.104-2 Section 101-5.104-2 Public Contracts and Property Management Federal... SERVICES IN FEDERAL BUILDINGS AND COMPLEXES 5.1-General § 101-5.104-2 Basis for determining economic feasibility. (a) Whenever possible, determination of the economic feasibility of a proposed centralized...

  20. 41 CFR 101-5.104-2 - Basis for determining economic feasibility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... economic feasibility. 101-5.104-2 Section 101-5.104-2 Public Contracts and Property Management Federal... SERVICES IN FEDERAL BUILDINGS AND COMPLEXES 5.1-General § 101-5.104-2 Basis for determining economic feasibility. (a) Whenever possible, determination of the economic feasibility of a proposed centralized...

  1. 41 CFR 101-5.104-2 - Basis for determining economic feasibility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... economic feasibility. 101-5.104-2 Section 101-5.104-2 Public Contracts and Property Management Federal... SERVICES IN FEDERAL BUILDINGS AND COMPLEXES 5.1-General § 101-5.104-2 Basis for determining economic feasibility. (a) Whenever possible, determination of the economic feasibility of a proposed centralized...

  2. An Herbal Derivative as the Basis for a New Approach to Treating Post-Traumatic Osteoarthritis

    DTIC Science & Technology

    2017-09-01

    AWARD NUMBER: W81XWH-15-1-0397 TITLE: An Herbal Derivative as the Basis for a New Approach to Treating Post - Traumatic Osteoarthritis...TITLE AND SUBTITLE An Herbal Derivative as the Basis for a New Approach to Treating Post - Traumatic Osteoarthritis 5a. CONTRACT NUMBER 5b. GRANT...responsible for charging tRNAs with the amino acid proline. The goal of this grant is to test the hypothesis that EPRS inhibitors will provide the basis

  3. Theoretical Investigation Leading to Energy Storage in Atomic and Molecular Systems

    DTIC Science & Technology

    1990-12-01

    can be calculated in a single run. 21 j) Non-gradient optimization of basis function exponents is possible. The source code can be modified to carry...basis. The 10s3p/5s3p basis consists of the 9s/4s contraction of Siegbahn and Liu (Reference 91) augmented by a diffuse s-type function ( exponent ...vibrational modes. Introduction of diffuse basis functions and optimization of the d-orbital exponents have a small but important effect on the

  4. SparseMaps—A systematic infrastructure for reduced-scaling electronic structure methods. III. Linear-scaling multireference domain-based pair natural orbital N-electron valence perturbation theory

    NASA Astrophysics Data System (ADS)

    Guo, Yang; Sivalingam, Kantharuban; Valeev, Edward F.; Neese, Frank

    2016-03-01

    Multi-reference (MR) electronic structure methods, such as MR configuration interaction or MR perturbation theory, can provide reliable energies and properties for many molecular phenomena like bond breaking, excited states, transition states or magnetic properties of transition metal complexes and clusters. However, owing to their inherent complexity, most MR methods are still too computationally expensive for large systems. Therefore the development of more computationally attractive MR approaches is necessary to enable routine application for large-scale chemical systems. Among the state-of-the-art MR methods, second-order N-electron valence state perturbation theory (NEVPT2) is an efficient, size-consistent, and intruder-state-free method. However, there are still two important bottlenecks in practical applications of NEVPT2 to large systems: (a) the high computational cost of NEVPT2 for large molecules, even with moderate active spaces and (b) the prohibitive cost for treating large active spaces. In this work, we address problem (a) by developing a linear scaling "partially contracted" NEVPT2 method. This development uses the idea of domain-based local pair natural orbitals (DLPNOs) to form a highly efficient algorithm. As shown previously in the framework of single-reference methods, the DLPNO concept leads to an enormous reduction in computational effort while at the same time providing high accuracy (approaching 99.9% of the correlation energy), robustness, and black-box character. In the DLPNO approach, the virtual space is spanned by pair natural orbitals that are expanded in terms of projected atomic orbitals in large orbital domains, while the inactive space is spanned by localized orbitals. The active orbitals are left untouched. Our implementation features a highly efficient "electron pair prescreening" that skips the negligible inactive pairs. The surviving pairs are treated using the partially contracted NEVPT2 formalism. A detailed comparison between the partial and strong contraction schemes is made, with conclusions that discourage the strong contraction scheme as a basis for local correlation methods due to its non-invariance with respect to rotations in the inactive and external subspaces. A minimal set of conservatively chosen truncation thresholds controls the accuracy of the method. With the default thresholds, about 99.9% of the canonical partially contracted NEVPT2 correlation energy is recovered while the crossover of the computational cost with the already very efficient canonical method occurs reasonably early; in linear chain type compounds at a chain length of around 80 atoms. Calculations are reported for systems with more than 300 atoms and 5400 basis functions.

  5. Shopping for health: purchasing health services through contracts.

    PubMed

    Howden-Chapman, P; Ashton, T

    1994-01-01

    The 1993 New Zealand health service reforms were based on the purported efficiencies of the purchaser/provider split. Purchasers are required to contract for services that will maintain, improve and restore the health of the populations they serve. The purchasing role, which requires the development of contracting skills as well as the setting of strategic directions and priorities, is new and as yet poorly developed. This paper describes the role of purchasing agents in setting priorities, the different approaches that are being taken to contracting for services and some of the problems that have arisen in the first year of contracting. It explores the trade-off that is evident between the potential for improving efficiency through contestable contracting and the need to minimise transaction costs associated with the contracting process. The purchasers' accountability to the public and the Minister is analysed in the broader political context of the purchasers' role in shaping a public health service and improving the health of the population.

  6. 34 CFR Appendix A to Part 74 - Contract Provisions

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... suspected or reported violations to the Federal awarding agency. 4. Contract Work Hours and Safety Standards... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work... basic rate of pay for all hours worked in excess of 40 hours in the work week. Section 107 of the Act is...

  7. 36 CFR Appendix A to Part 1210 - Contract Provisions

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... suspected or reported violations to the Federal awarding agency. 4. Contract Work Hours and Safety Standards... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work... basic rate of pay for all hours worked in excess of 40 hours in the work week. Section 107 of the Act is...

  8. 32 CFR Appendix A to Part 34 - Contract Provisions

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work... basic rate of pay for all hours worked in excess of 40 hours in the work week. Section 107 of the Act is... laborers shall include a provision for compliance with Sections 102 and 107 of the Contract Work Hours and...

  9. 10 CFR Appendix A to Subpart B of... - Contract Provisions

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... suspected or reported violations to the Federal awarding agency. 4. Contract Work Hours and Safety Standards... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work... basic rate of pay for all hours worked in excess of 40 hours in the work week. Section 107 of the Act is...

  10. 14th Annual Small Business Conference

    DTIC Science & Technology

    2010-11-18

    Government Contracting, Small Business Administration 5:45 pm - 7:45 pm RECEPTION IN DISPLAY AREA 14TH ANNUAL SMALL BUSINESS CONFERENCE...as a lobbyist for a large multi-national conglomerate that included among its subsidiaries movie companies, sports teams, financial services companies...Past Performance /Small Business Participation > M.1 Basis of Award: The Government plans to award a single contract for the Fighting Trailer

  11. 75 FR 24626 - Order Finding That the TETCO-M3 Financial Basis Contract Traded on the IntercontinentalExchange...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... (``ECM'') under sections 2(h)(3)-(5) of the Commodity Exchange Act (``CEA'' or the ``Act''), performs a...\\ significantly broadened the CFTC's regulatory authority with respect to ECMs by creating, in section 2(h)(7) of the CEA, a new regulatory category--ECMs on which significant price discovery contracts (``SPDCs...

  12. Cost analysis helps evaluate contract profitability.

    PubMed

    Sides, R W

    2000-02-01

    A cost-accounting analysis can help group practices assess their costs of doing business and determine the profitability of managed care contracts. Group practices also can use cost accounting to develop budgets and financial benchmarks. To begin a cost analysis, group practices need to determine their revenue and cost centers. Then they can allocate their costs to each center, using an appropriate allocation basis. The next step is to calculate costs per procedure. The results can be used to evaluate operational cost efficiency as well as help negotiate managed care contracts.

  13. Correlation consistent basis sets for the atoms In–Xe

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mahler, Andrew; Wilson, Angela K., E-mail: akwilson@unt.edu

    In this work, the correlation consistent family of Gaussian basis sets has been expanded to include all-electron basis sets for In–Xe. The methodology for developing these basis sets is described, and several examples of the performance and utility of the new sets have been provided. Dissociation energies and bond lengths for both homonuclear and heteronuclear diatomics demonstrate the systematic convergence behavior with respect to increasing basis set quality expected by the family of correlation consistent basis sets in describing molecular properties. Comparison with recently developed correlation consistent sets designed for use with the Douglas-Kroll Hamiltonian is provided.

  14. [Collective versus selective contracts from a legal point of view].

    PubMed

    Schirmer, Horst Dieter

    2006-01-01

    The historically proven organisational model of service relations between sickness funds and healthcare providers are collective contracts. A collective contract as a standards treaty ("Normenvertrag") is particularly pronounced concerning the panel doctor law ("Vertragsarztrecht") defining medical care on the basis of the principle of benefits in kind governing benefit claims of the insured in case of illness. The collective contract is a suitable instrument for ensuring both consistent and exhaustive provision of care and for organising the conditions of care, especially the quality and reimbursement of professional medical services. For several years the legislator has been "experimenting" with parallel contract design patterns such as the contract of integrated care in the form of selective contracts between health insurances or their associations and healthcare providers or groups of healthcare providers. More recently, allowances for conclusion of such contracts have been supposed to lead to competition between the contractual systems. It is doubtful whether this "push-start" will contribute to overcoming the systematic legal disadvantages of selective contracting as an organisational model for the provision of healthcare services to the insured.

  15. Development of a naming convention and data ma nagement system

    NASA Technical Reports Server (NTRS)

    Mcnider, Richard T.; Botts, Michael; Moss, Don; Conover, Helen; Criswell, Evan; Graves, Sara; Hardin, Danny

    1993-01-01

    This contract covered work in data management, acquisition, and analysis for the Earth Science and Applications Division (ESAD) of the Space Science Laboratory of MSFC. Under this contract, a naming convention and data management system were developed for ESAD data sets, data visualization, and standard data format issues were investigated, and specific data analysis and management needs were addressed for several ESAD projects and data sets. In the following sections, details of the research performed over the duration of this contract are summarized.

  16. The CCTC Quick-Reacting General War Gaming System (QUICK) Program Maintenance Manual. Volume I. Data Management Subsystem. Change 3.

    DTIC Science & Technology

    1980-05-22

    cross -referenced with the number of the data transaction listed in the data module quality con- trol list NVB Integer variable used to...Organization of the Joint Chiefs of Staff. Technical support was provided by System Sciences, Incorporated under Contract Number DCA100-75-C-0019. Change set... Contract Number DCA 100-75-C-0019. Change set two was prepared u nder Contract Number DCA 100-78-C-0035. Computer Sciences Corporation prepared change

  17. Contracting in vivo research: what are the issues?

    PubMed

    Underwood, Wendy J

    2007-07-01

    As a result of increasing internal and external pressures, research institutions are using contract research organizations for the conduct of in vivo research. Many issues arise when contracting animal research, including concern regarding animal health and welfare. Each sponsor institution should develop a program for outsourced in vivo research that evaluates and ensures appropriate care and use of research animals. Each sponsoring institution should consider establishing a policy and procedure for how outsourced in vivo studies will be approved, conducted, and monitored. An approved list of contract facilities can be established on the basis of accepted standards for animal care and use. Written contracts should include confidentiality agreements, the delineation of animal ownership, and the expectation to comply with all applicable regulations and guidelines for research animal care and use. Finally, a process for communication of adverse study or animal welfare events should be established. Thorough evaluation of contract organizations will help ensure appropriate research animal care and use.

  18. 45 CFR 98.47 - Nondiscrimination in employment on the basis of religion.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... religion. 98.47 Section 98.47 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION... Requirements § 98.47 Nondiscrimination in employment on the basis of religion. (a) In general, except as... religion. (1) Child care providers that receive assistance through grants or contracts under the CCDF shall...

  19. 45 CFR 98.47 - Nondiscrimination in employment on the basis of religion.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... religion. 98.47 Section 98.47 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION... Requirements § 98.47 Nondiscrimination in employment on the basis of religion. (a) In general, except as... religion. (1) Child care providers that receive assistance through grants or contracts under the CCDF shall...

  20. 45 CFR 98.47 - Nondiscrimination in employment on the basis of religion.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... religion. 98.47 Section 98.47 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION... Requirements § 98.47 Nondiscrimination in employment on the basis of religion. (a) In general, except as... religion. (1) Child care providers that receive assistance through grants or contracts under the CCDF shall...

  1. 45 CFR 98.47 - Nondiscrimination in employment on the basis of religion.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... religion. 98.47 Section 98.47 Public Welfare Department of Health and Human Services GENERAL ADMINISTRATION... Requirements § 98.47 Nondiscrimination in employment on the basis of religion. (a) In general, except as... religion. (1) Child care providers that receive assistance through grants or contracts under the CCDF shall...

  2. 45 CFR 98.47 - Nondiscrimination in employment on the basis of religion.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... religion. 98.47 Section 98.47 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION... Requirements § 98.47 Nondiscrimination in employment on the basis of religion. (a) In general, except as... religion. (1) Child care providers that receive assistance through grants or contracts under the CCDF shall...

  3. 26 CFR 1.810-2 - Rules for certain reserves.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... insurance reserves on a preliminary term basis elects to revalue such reserves on a net level premium basis... insurance reserves (as defined in section 801(b) and § 1.801-4); (2) The unearned premiums and unpaid losses... liabilities for premium deposit funds. (6) Special contingency reserves under contracts of group term life...

  4. 48 CFR 237.7101 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... and dry cleaning services to be provided on a bulk weight basis. (1) Insert a reasonable per pound..., Instruction to Offerors (Bulk Weight), in solicitations for laundry services to be provided on a bulk weight... laundry services on a bag type basis, insert reasonable per pound prices by bag type. (2) Insert an...

  5. 42 CFR 417.470 - Basis and scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Basis and scope. 417.470 Section 417.470 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... section 1876(c), (g), (h), and (i) of the Act that pertain to the contract between CMS and an HMO or CMP...

  6. Cardiac system bioenergetics: metabolic basis of the Frank-Starling law

    PubMed Central

    Saks, Valdur; Dzeja, Petras; Schlattner, Uwe; Vendelin, Marko; Terzic, Andre; Wallimann, Theo

    2006-01-01

    The fundamental principle of cardiac behaviour is described by the Frank-Starling law relating force of contraction during systole with end-diastolic volume. While both work and respiration rates increase linearly with imposed load, the basis of mechano-energetic coupling in heart muscle has remained a long-standing enigma. Here, we highlight advances made in understanding of complex cellular and molecular mechanisms that orchestrate coupling of mitochondrial oxidative phosphorylation with ATP utilization for muscle contraction. Cardiac system bioenergetics critically depends on an interrelated metabolic infrastructure regulating mitochondrial respiration and energy fluxes throughout cellular compartments. The data reviewed indicate the significance of two interrelated systems regulating mitochondrial respiration and energy fluxes in cells: (1) the creatine kinase, adenylate kinase and glycolytic pathways that communicate flux changes generated by cellular ATPases within structurally organized enzymatic modules and networks; and (2) a secondary system based on mitochondrial participation in cellular calcium cycle, which adjusts substrate oxidation and energy-transducing processes to meet increasing cellular energy demands. By conveying energetic signals to metabolic sensors, coupled phosphotransfer reactions provide a high-fidelity regulation of the excitation–contraction cycle. Such integration of energetics with calcium signalling systems provides the basis for ‘metabolic pacing’, synchronizing the cellular electrical and mechanical activities with energy supply processes. PMID:16410283

  7. The utility of monetary contingency contracts for weight loss: a systematic review and meta-analysis.

    PubMed

    Sykes-Muskett, Bianca J; Prestwich, Andrew; Lawton, Rebecca J; Armitage, Christopher J

    2015-01-01

    Financial incentives to improve health have received increasing attention, but are subject to ethical concerns. Monetary Contingency Contracts (MCCs), which require individuals to deposit money that is refunded contingent on reaching a goal, are a potential alternative strategy. This review evaluates systematically the evidence for weight loss-related MCCs. Randomised controlled trials testing the effect of weight loss-related MCCs were identified in online databases. Random-effects meta-analyses were used to calculate overall effect sizes for weight loss and participant retention. The association between MCC characteristics and weight loss/participant retention effects was calculated using meta-regression. There was a significant small-to-medium effect of MCCs on weight loss during treatment when one outlier study was removed. Group refunds, deposit not paid as lump sum, participants setting their own deposit size and additional behaviour change techniques were associated with greater weight loss during treatment. Post-treatment, there was no significant effect of MCCs on weight loss. There was a significant small-to-medium effect of MCCs on participant retention during treatment. Researcher-set deposits paid as one lump sum, refunds delivered on an all-or-nothing basis and refunds contingent on attendance at classes were associated with greater retention during treatment. Post-treatment, there was no significant effect of MCCs on participant retention. The results support the use of MCCs to promote weight loss and participant retention up to the point that the incentive is removed and identifies the conditions under which MCCs work best.

  8. Push it to the limit: Characterizing the convergence of common sequences of basis sets for intermolecular interactions as described by density functional theory

    NASA Astrophysics Data System (ADS)

    Witte, Jonathon; Neaton, Jeffrey B.; Head-Gordon, Martin

    2016-05-01

    With the aim of systematically characterizing the convergence of common families of basis sets such that general recommendations for basis sets can be made, we have tested a wide variety of basis sets against complete-basis binding energies across the S22 set of intermolecular interactions—noncovalent interactions of small and medium-sized molecules consisting of first- and second-row atoms—with three distinct density functional approximations: SPW92, a form of local-density approximation; B3LYP, a global hybrid generalized gradient approximation; and B97M-V, a meta-generalized gradient approximation with nonlocal correlation. We have found that it is remarkably difficult to reach the basis set limit; for the methods and systems examined, the most complete basis is Jensen's pc-4. The Dunning correlation-consistent sequence of basis sets converges slowly relative to the Jensen sequence. The Karlsruhe basis sets are quite cost effective, particularly when a correction for basis set superposition error is applied: counterpoise-corrected def2-SVPD binding energies are better than corresponding energies computed in comparably sized Dunning and Jensen bases, and on par with uncorrected results in basis sets 3-4 times larger. These trends are exhibited regardless of the level of density functional approximation employed. A sense of the magnitude of the intrinsic incompleteness error of each basis set not only provides a foundation for guiding basis set choice in future studies but also facilitates quantitative comparison of existing studies on similar types of systems.

  9. 24 CFR 963.12 - Alternative procurement process.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... URBAN DEVELOPMENT PUBLIC HOUSING-CONTRACTING WITH RESIDENT-OWNED BUSINESSES Contracting With Resident-Owned Businesses § 963.12 Alternative procurement process. (a) Method of procurement. In contracting with resident-owned businesses, the PHA shall follow the applicable method of procurement as set forth...

  10. 24 CFR 941.103 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and construction specifications and the rehabilitation work write-ups, where applicable, that set forth the work to be done under a construction contract or contract of sale. Contract of sale. A... preliminary drawings and specifications and the preliminary rehabilitation work write-ups, where applicable...

  11. 29 CFR 785.4 - Application to Walsh-Healey Public Contracts Act.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Application to Walsh-Healey Public Contracts Act. 785.4... Considerations § 785.4 Application to Walsh-Healey Public Contracts Act. The principles set forth in this part... employees performing work subject to the provisions of the Walsh-Healey Public Contracts Act. [35 FR 15289...

  12. 48 CFR 1615.407-1 - Rate reduction for defective pricing or defective cost or pricing data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... defective pricing or defective cost or pricing data. 1615.407-1 Section 1615.407-1 Federal Acquisition... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1615.407-1 Rate reduction for defective pricing or defective cost or pricing data. The clause set forth in section 1652.215-70...

  13. 48 CFR 1615.407-1 - Rate reduction for defective pricing or defective cost or pricing data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... defective pricing or defective cost or pricing data. 1615.407-1 Section 1615.407-1 Federal Acquisition... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1615.407-1 Rate reduction for defective pricing or defective cost or pricing data. The clause set forth in section 1652.215-70...

  14. 48 CFR 1615.407-1 - Rate reduction for defective pricing or defective cost or pricing data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... defective pricing or defective cost or pricing data. 1615.407-1 Section 1615.407-1 Federal Acquisition... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1615.407-1 Rate reduction for defective pricing or defective cost or pricing data. The clause set forth in section 1652.215-70...

  15. 48 CFR 1615.407-1 - Rate reduction for defective pricing or defective cost or pricing data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... defective pricing or defective cost or pricing data. 1615.407-1 Section 1615.407-1 Federal Acquisition... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1615.407-1 Rate reduction for defective pricing or defective cost or pricing data. The clause set forth in section 1652.215-70...

  16. 48 CFR 227.7009-4 - Additional clauses-contracts providing for payment of a running royalty.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-contracts providing for payment of a running royalty. 227.7009-4 Section 227.7009-4 Federal Acquisition... clauses—contracts providing for payment of a running royalty. The clauses set forth below are examples... desired to cover the subject matter thereof and the contract provides for payment of a running royalty. (a...

  17. 48 CFR 227.7009-4 - Additional clauses-contracts providing for payment of a running royalty.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-contracts providing for payment of a running royalty. 227.7009-4 Section 227.7009-4 Federal Acquisition... clauses—contracts providing for payment of a running royalty. The clauses set forth below are examples... desired to cover the subject matter thereof and the contract provides for payment of a running royalty. (a...

  18. 48 CFR 1336.602-5 - Short selection process for contracts not to exceed the simplified acquisition threshold.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for contracts not to exceed the simplified acquisition threshold. 1336.602-5 Section 1336.602-5... for contracts not to exceed the simplified acquisition threshold. (a) In contracts not expected to exceed the simplified acquisition threshold, either or both of the short selection processes set out at...

  19. 45 CFR 2543.84 - Contract Work Hours and Safety Standards Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Contract Work Hours and Safety Standards Act. 2543... laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is... pay for all hours worked in excess of 40 hours in the work week. Section 107 of the Act is applicable...

  20. 14 CFR Appendix A to Subpart B of... - Contract Provisions

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... suspected or reported violations to the NASA. 4. Contract Work Hours and Safety Standards Act (40 U.S.C. 327... laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is... pay for all hours worked in excess of 40 hours in the work week. Section 107 of the Act is applicable...

  1. 10 CFR Appendix B to Subpart D of... - Contract Provisions

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week... basic rate of pay for all hours worked in excess of 40 hours in the work week. Section 107 of the Act is... laborers must include a provision for compliance with Sections 102 and 107 of the Contract Work Hours and...

  2. Commercial contracts and the moral contract: a response to Nigel Cameron.

    PubMed

    Hare, J E

    1994-03-01

    John E. Hare responds to Cameron's article by challenging the adequacy of the Hippocratic Oath as a basis for ethical medicine. The Oath promoted a "guild mentality" that is evident, for example, in modern medicine's resistance to alternative forms of practice. Christians need to "winnow" bioethical views, both those traditionally honored and those that confront us because of new medical developments.

  3. Contract Source Selection: An Analysis of Lowest Price Technically Acceptable and Tradeoff Strategies

    DTIC Science & Technology

    2016-06-15

    selection strategy is key to minimizing risk and ensuring best value for all stakeholders. On the basis of thorough market research , acquisition...administrative lead-time, Contractor Performance Assessment Reporting System ratings, and earned value management assessments) and source selection strategy ...Postgraduate School A. PURPOSE This research analyzes LPTA and tradeoff source selection strategies and contract outcomes to determine if a relationship

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Witte, Jonathon; Molecular Foundry, Lawrence Berkeley National Laboratory, Berkeley, California 94720; Neaton, Jeffrey B.

    With the aim of systematically characterizing the convergence of common families of basis sets such that general recommendations for basis sets can be made, we have tested a wide variety of basis sets against complete-basis binding energies across the S22 set of intermolecular interactions—noncovalent interactions of small and medium-sized molecules consisting of first- and second-row atoms—with three distinct density functional approximations: SPW92, a form of local-density approximation; B3LYP, a global hybrid generalized gradient approximation; and B97M-V, a meta-generalized gradient approximation with nonlocal correlation. We have found that it is remarkably difficult to reach the basis set limit; for the methodsmore » and systems examined, the most complete basis is Jensen’s pc-4. The Dunning correlation-consistent sequence of basis sets converges slowly relative to the Jensen sequence. The Karlsruhe basis sets are quite cost effective, particularly when a correction for basis set superposition error is applied: counterpoise-corrected def2-SVPD binding energies are better than corresponding energies computed in comparably sized Dunning and Jensen bases, and on par with uncorrected results in basis sets 3-4 times larger. These trends are exhibited regardless of the level of density functional approximation employed. A sense of the magnitude of the intrinsic incompleteness error of each basis set not only provides a foundation for guiding basis set choice in future studies but also facilitates quantitative comparison of existing studies on similar types of systems.« less

  5. In vivo cardiac nano-imaging: A new technology for high-precision analyses of sarcomere dynamics in the heart.

    PubMed

    Shimozawa, Togo; Hirokawa, Erisa; Kobirumaki-Shimozawa, Fuyu; Oyama, Kotaro; Shintani, Seine A; Terui, Takako; Kushida, Yasuharu; Tsukamoto, Seiichi; Fujii, Teruyuki; Ishiwata, Shin'ichi; Fukuda, Norio

    2017-03-01

    The cardiac pump function is a result of a rise in intracellular Ca 2+ and the ensuing sarcomeric contractions [i.e., excitation-contraction (EC) coupling] in myocytes in various locations of the heart. In order to elucidate the heart's mechanical properties under various settings, cardiac imaging is widely performed in today's clinical as well as experimental cardiology by using echocardiogram, magnetic resonance imaging and computed tomography. However, because these common techniques detect local myocardial movements at a spatial resolution of ∼100 μm, our knowledge on the sub-cellular mechanisms of the physiology and pathophysiology of the heart in vivo is limited. This is because (1) EC coupling occurs in the μm partition in a myocyte and (2) cardiac sarcomeres generate active force upon a length change of ∼100 nm on a beat-to-beat basis. Recent advances in optical technologies have enabled measurements of intracellular Ca 2+ dynamics and sarcomere length displacements at high spatial and temporal resolution in the beating heart of living rodents. Future studies with these technologies are warranted to open a new era in cardiac research. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. 17 CFR 151.11 - Designated contract market and swap execution facility position limits and accountability rules.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Designated contract market and swap execution facility position limits and accountability rules. (a) Spot... rules and procedures for monitoring and enforcing spot-month position limits set at levels no greater... monitoring and enforcing spot-month position limits set at levels no greater than 25 percent of estimated...

  7. 17 CFR 151.11 - Designated contract market and swap execution facility position limits and accountability rules.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Designated contract market and swap execution facility position limits and accountability rules. (a) Spot... rules and procedures for monitoring and enforcing spot-month position limits set at levels no greater... monitoring and enforcing spot-month position limits set at levels no greater than 25 percent of estimated...

  8. 78 FR 61113 - Acquisition Process: Task and Delivery Order Contracts, Bundling, Consolidation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-02

    ... that a total set-aside is not appropriate but the procurement can be broken up into smaller discrete... discrete components to support a partial set-aside and market research shows that either: at least two... could divide a multiple award contract for divergent goods and services into discrete categories (which...

  9. Sex differences in neuromuscular function after repeated eccentric contractions of the knee extensor muscles.

    PubMed

    Lee, Andrea; Baxter, Jake; Eischer, Claire; Gage, Matt; Hunter, Sandra; Yoon, Tejin

    2017-06-01

    This study examined the mechanisms for force and power reduction during and up to 48 h after maximal eccentric contractions of the knee extensor muscles in young men and women. 13 men (22.8 ± 2.6 years) and 13 women (21.6 ± 2.2 years) performed 150 maximal effort eccentric contractions (5 sets of 30) with the knee extensor muscles at 60° s -1 . Maximal voluntary isometric contractions (MVIC) and maximal voluntary concentric contractions (MVCC) were performed before and after the 150 eccentric contractions. The MVCCs involved a set of two isokinetic contractions at 60° s -1 and sets of isotonic contractions performed at seven different resistance loads (1 N m, 10, 20, 30, 40, 50, and 60% MVIC). Electrical stimulation was used during the MVICs and at rest to determine changes in voluntary activation and contractile properties. At baseline, men were stronger than women (MVIC: 276 ± 48 vs. 133 ± 37 N m) and more powerful (MVCC: 649 ± 77 vs. 346 ± 78 W). At termination of the eccentric contractions, voluntary activation, resting twitch amplitude, and peak power during concentric contractions at the seven loads and at 60° s -1 decreased (P < 0.05) similarly in the men and women. At 48 h post-exercise, the MVIC torque, power (for loads ≥20-60% MVIC), and voluntary activation remained depressed (P < 0.05), but the resting twitch had returned to baseline (P > 0.05) with no sex differences. Central mechanisms were primarily responsible for the depressed maximal force production up to 48 h after repeated eccentric contractions of the knee extensors and these mechanisms were similar in men and women.

  10. Accuracy of Lagrange-sinc functions as a basis set for electronic structure calculations of atoms and molecules

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Choi, Sunghwan; Hong, Kwangwoo; Kim, Jaewook

    2015-03-07

    We developed a self-consistent field program based on Kohn-Sham density functional theory using Lagrange-sinc functions as a basis set and examined its numerical accuracy for atoms and molecules through comparison with the results of Gaussian basis sets. The result of the Kohn-Sham inversion formula from the Lagrange-sinc basis set manifests that the pseudopotential method is essential for cost-effective calculations. The Lagrange-sinc basis set shows faster convergence of the kinetic and correlation energies of benzene as its size increases than the finite difference method does, though both share the same uniform grid. Using a scaling factor smaller than or equal tomore » 0.226 bohr and pseudopotentials with nonlinear core correction, its accuracy for the atomization energies of the G2-1 set is comparable to all-electron complete basis set limits (mean absolute deviation ≤1 kcal/mol). The same basis set also shows small mean absolute deviations in the ionization energies, electron affinities, and static polarizabilities of atoms in the G2-1 set. In particular, the Lagrange-sinc basis set shows high accuracy with rapid convergence in describing density or orbital changes by an external electric field. Moreover, the Lagrange-sinc basis set can readily improve its accuracy toward a complete basis set limit by simply decreasing the scaling factor regardless of systems.« less

  11. [Excitation-contraction coupling in skeletal muscle: questions remaining after 50 years of research].

    PubMed

    Calderón-Vélez, Juan Camilo; Figueroa-Gordon, Lourdes Carolina

    2009-03-01

    The excitation-contraction coupling mechanism was defined as the entire sequence of reactions linking excitation of plasma membrane to activation of contraction in skeletal muscle. By using different techniques, their regulation and interactions have been studied during the last 50 years, defining until now the importance and origin of the calcium ion as a contractile activator and the main proteins involved in the whole mechanism. Furthermore, the study of the ultrastructural basis and pharmacological regulation of the excitation-contraction coupling phenomenon has begun. The excitation-contraction coupling is thought to be altered in situations as ageing, muscle fatigue and some muscle diseases. However, many questions remain to be answered. For example, (1) How excitation-contraction coupling develops and ages? (2) What role does it play in muscle fatigue and other diseases? (3) What is the nature of the interaction between the proteins believed to be involved? The present review describes excitation-contraction coupling in skeletal muscle and techniques used to better understand it as an introduction for discussing unanswered questions regarding excitation-contraction coupling.

  12. Physiology of Normal Esophageal Motility

    PubMed Central

    Goyal, Raj K; Chaudhury, Arun

    2009-01-01

    The esophagus consists of two different parts. In humans, the cervical esophagus is composed of striated muscles and the thoracic esophagus is composed of phasic smooth muscles. The striated muscle esophagus is innervated by the lower motor neurons and peristalsis in this segment is due to sequential activation of the motor neurons in the nucleus ambiguus. Both primary and secondary peristaltic contractions are centrally mediated. The smooth muscle of esophagus is phasic in nature and is innervated by intramural inhibitory (nitric oxide releasing) and excitatory (acetylcholine releasing) neurons that receive inputs from separate sets of preganglionic neurons located in the dorsal motor nucleus of vagus. The primary peristalsis in this segment involves both central and peripheral mechanisms. The primary peristalsis consist of inhibition (called deglutitive inhibition) followed by excitation. The secondary peristalsis is entirely due to peripheral mechanisms and also involves inhibition followed by excitation. The lower esophageal sphincter (LES) is characterized by tonic muscle that is different from the muscle of the esophageal body. The LES, like the esophageal body smooth muscle, is also innervated by the inhibitory and excitatory neurons. The LES maintains tonic closure due to its myogenic property. The LES tone is modulated by the inhibitory and the excitatory nerves. Inhibitory nerves mediate LES relaxation and the excitatory nerves mediate reflex contraction or rebound contraction of the LES. Clinical disorders of esophageal motility can be classified on the basis of disorders of the inhibitory and excitatory innervations and the smooth muscles. PMID:18364578

  13. Mechanisms of boron fiber strengthening by thermal treatment

    NASA Technical Reports Server (NTRS)

    Dicarlo, J. A.

    1979-01-01

    The fracture strain for boron on tungsten fibers can be improved by heat treatment under vacuum or argon environments. The mechanical basis for this improvement is thermally-induced axial contraction of the entire fiber, whereby strength-controlling core flaws are compressed and fiber fracture strain increased by the value of the contraction strain. By highly sensitive measurements of fiber density and volume, the physical mechanisms responsible for contraction under both environments was identified as boron atom diffusion out of the fiber sheath. The fiber contracts because the average volume of the resulting microvoid was determined to be only 0.26 + or - 0.09 the average atomic volume of the removed atom. The basic and practical implications of these results are discussed with particular emphasis on the theory, use, and limitations of heat-induced contraction as a simple cost-effective secondary processing method.

  14. Optimization of selected molecular orbitals in group basis sets.

    PubMed

    Ferenczy, György G; Adams, William H

    2009-04-07

    We derive a local basis equation which may be used to determine the orbitals of a group of electrons in a system when the orbitals of that group are represented by a group basis set, i.e., not the basis set one would normally use but a subset suited to a specific electronic group. The group orbitals determined by the local basis equation minimize the energy of a system when a group basis set is used and the orbitals of other groups are frozen. In contrast, under the constraint of a group basis set, the group orbitals satisfying the Huzinaga equation do not minimize the energy. In a test of the local basis equation on HCl, the group basis set included only 12 of the 21 functions in a basis set one might ordinarily use, but the calculated active orbital energies were within 0.001 hartree of the values obtained by solving the Hartree-Fock-Roothaan (HFR) equation using all 21 basis functions. The total energy found was just 0.003 hartree higher than the HFR value. The errors with the group basis set approximation to the Huzinaga equation were larger by over two orders of magnitude. Similar results were obtained for PCl(3) with the group basis approximation. Retaining more basis functions allows an even higher accuracy as shown by the perfect reproduction of the HFR energy of HCl with 16 out of 21 basis functions in the valence basis set. When the core basis set was also truncated then no additional error was introduced in the calculations performed for HCl with various basis sets. The same calculations with fixed core orbitals taken from isolated heavy atoms added a small error of about 10(-4) hartree. This offers a practical way to calculate wave functions with predetermined fixed core and reduced base valence orbitals at reduced computational costs. The local basis equation can also be used to combine the above approximations with the assignment of local basis sets to groups of localized valence molecular orbitals and to derive a priori localized orbitals. An appropriately chosen localization and basis set assignment allowed a reproduction of the energy of n-hexane with an error of 10(-5) hartree, while the energy difference between its two conformers was reproduced with a similar accuracy for several combinations of localizations and basis set assignments. These calculations include localized orbitals extending to 4-5 heavy atoms and thus they require to solve reduced dimension secular equations. The dimensions are not expected to increase with increasing system size and thus the local basis equation may find use in linear scaling electronic structure calculations.

  15. LPTA Versus Tradeoff: How Procurement Methods Can Impact Contract Performance

    DTIC Science & Technology

    2015-06-01

    and Technology BBP Better Buying Power BPA Blanket Purchase Agreement CAR Contract Action Report COR Contracting Officer’s...Blanket Purchase Agreements ( BPAs ), which utilize streamlined contracting in the form of orders to award requirements faster. Under IDIQs, GSA vehicles...and BPA agreements the rates are typically pre-negotiated with the set of vendors, leaving little necessity for negotiation and tradeoff tactics

  16. 48 CFR 1827.409 - Solicitation provisions and contract clauses. (NASA supplements paragraph (a), (b), (c), (d), (e...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... and contract clauses. (NASA supplements paragraph (a), (b), (c), (d), (e), (i), and (k)) 1827.409... Solicitation provisions and contract clauses. (NASA supplements paragraph (a), (b), (c), (d), (e), (i), and (k.... (k)(i) The contracting officer shall add paragraph (e) as set forth in 1852.227-19(a) to the clause...

  17. 41 CFR 101-4.550 - Sex as a bona fide occupational qualification.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Sex as a bona fide... ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Discrimination on the Basis of Sex in Employment in Education Programs or Activities Prohibited § 101-4.550 Sex...

  18. 41 CFR 101-4.550 - Sex as a bona fide occupational qualification.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Sex as a bona fide... ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Discrimination on the Basis of Sex in Employment in Education Programs or Activities Prohibited § 101-4.550 Sex...

  19. 41 CFR 101-4.550 - Sex as a bona fide occupational qualification.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Sex as a bona fide... ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Discrimination on the Basis of Sex in Employment in Education Programs or Activities Prohibited § 101-4.550 Sex...

  20. 41 CFR 101-4.550 - Sex as a bona fide occupational qualification.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Sex as a bona fide... ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Discrimination on the Basis of Sex in Employment in Education Programs or Activities Prohibited § 101-4.550 Sex...

  1. 41 CFR 101-4.550 - Sex as a bona fide occupational qualification.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Sex as a bona fide... ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Discrimination on the Basis of Sex in Employment in Education Programs or Activities Prohibited § 101-4.550 Sex...

  2. 76 FR 9843 - Self-Regulatory Organizations; NYSE Arca, Inc.; Order Granting Approval of Proposed Rule Change...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... Contracts, to reflect the difference in the daily return between two market segments. Although each Index is... specific market segments. By rebalancing each Index on a daily basis as of the Index Calculation Time, each... return, on a leveraged basis, between two predetermined market segments. Each Fund will represent a...

  3. Accurate Methods for Large Molecular Systems (Preprint)

    DTIC Science & Technology

    2009-01-06

    tensor, EFP calculations are basis set dependent. The smallest recommended basis set is 6- 31++G( d , p )52 The dependence of the computational cost of...and second order perturbation theory (MP2) levels with the 6-31G( d , p ) basis set. Additional SFM tests are presented for a small set of alpha...helices using the 6-31++G( d , p ) basis set. The larger 6-311++G(3df,2p) basis set is employed for creating all EFPs used for non- bonded interactions, since

  4. Approaching the theoretical limit in periodic local MP2 calculations with atomic-orbital basis sets: the case of LiH.

    PubMed

    Usvyat, Denis; Civalleri, Bartolomeo; Maschio, Lorenzo; Dovesi, Roberto; Pisani, Cesare; Schütz, Martin

    2011-06-07

    The atomic orbital basis set limit is approached in periodic correlated calculations for solid LiH. The valence correlation energy is evaluated at the level of the local periodic second order Møller-Plesset perturbation theory (MP2), using basis sets of progressively increasing size, and also employing "bond"-centered basis functions in addition to the standard atom-centered ones. Extended basis sets, which contain linear dependencies, are processed only at the MP2 stage via a dual basis set scheme. The local approximation (domain) error has been consistently eliminated by expanding the orbital excitation domains. As a final result, it is demonstrated that the complete basis set limit can be reached for both HF and local MP2 periodic calculations, and a general scheme is outlined for the definition of high-quality atomic-orbital basis sets for solids. © 2011 American Institute of Physics

  5. 42 CFR 422.502 - Evaluation and determination procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SERVICES (CONTINUED) MEDICARE PROGRAM MEDICARE ADVANTAGE PROGRAM Application Procedures and Contracts for Medicare Advantage Organizations § 422.502 Evaluation and determination procedures. (a) Basis for...

  6. An expanded calibration study of the explicitly correlated CCSD(T)-F12b method using large basis set standard CCSD(T) atomization energies.

    PubMed

    Feller, David; Peterson, Kirk A

    2013-08-28

    The effectiveness of the recently developed, explicitly correlated coupled cluster method CCSD(T)-F12b is examined in terms of its ability to reproduce atomization energies derived from complete basis set extrapolations of standard CCSD(T). Most of the standard method findings were obtained with aug-cc-pV7Z or aug-cc-pV8Z basis sets. For a few homonuclear diatomic molecules it was possible to push the basis set to the aug-cc-pV9Z level. F12b calculations were performed with the cc-pVnZ-F12 (n = D, T, Q) basis set sequence and were also extrapolated to the basis set limit using a Schwenke-style, parameterized formula. A systematic bias was observed in the F12b method with the (VTZ-F12/VQZ-F12) basis set combination. This bias resulted in the underestimation of reference values associated with small molecules (valence correlation energies <0.5 E(h)) and an even larger overestimation of atomization energies for bigger systems. Consequently, caution should be exercised in the use of F12b for high accuracy studies. Root mean square and mean absolute deviation error metrics for this basis set combination were comparable to complete basis set values obtained with standard CCSD(T) and the aug-cc-pVDZ through aug-cc-pVQZ basis set sequence. However, the mean signed deviation was an order of magnitude larger. Problems partially due to basis set superposition error were identified with second row compounds which resulted in a weak performance for the smaller VDZ-F12/VTZ-F12 combination of basis sets.

  7. 17 CFR 151.11 - Designated contract market and swap execution facility position limits and accountability rules.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    .... (a) Spot-month limits. (1) For all Referenced Contracts executed pursuant to their rules, swap..., establish rules and procedures for monitoring and enforcing spot-month position limits set at levels no... monitoring and enforcing spot-month position limits set at levels no greater than 25 percent of estimated...

  8. 13 CFR 125.19 - When may a contracting officer set-aside a procurement for SDVO SBCs?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... be made at fair market prices. This requirement does not preclude a contracting officer from making... delivery and award will be made at fair market prices. However, after conducting market research, the... rationale used to support the specific set-aside, including the type and extent of market research conducted...

  9. 22 CFR Appendix A to Part 145 - Clauses for Contracts and Small Purchases Awarded by Recipient

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... suspected or reported violations to the Department. 4. Contract Work Hours and Safety Standards Act (40 U.S... mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work... basic rate of pay for all hours worked in excess of 40 hours in the work week. Section 107 of the Act is...

  10. 48 CFR 2131.205-71 - Reinsurer administrative expense costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 2131.205-71... as set forth in the contract is an allowable cost when documented through an internal accounting... expense costs. 2131.205-71 Section 2131.205-71 Federal Acquisition Regulations System OFFICE OF PERSONNEL...

  11. 48 CFR 719.271-4 - Heads of contracting activities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Heads of contracting activities. 719.271-4 Section 719.271-4 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL... decisions in cases resulting from non-acceptances by their contracting officers of set-aside recommendations...

  12. Assessment of Aberdeen Proving Ground - Army Contracting Command, Contract Management Processes

    DTIC Science & Technology

    2015-04-11

    systems (2008). The Balance Scorecard approach is presented by Niven as “a carefully selected set of quantifiable measures derived from the ...areas of emphasis: the customer, internal processes, learning and growth and financial (Niven, 2003). Both public and private entities recognize the ...contract score card developed by Cullen looks further past the balance scorecard approach by assessing an organization’s contracted functions (2009

  13. Ab Initio Density Fitting: Accuracy Assessment of Auxiliary Basis Sets from Cholesky Decompositions.

    PubMed

    Boström, Jonas; Aquilante, Francesco; Pedersen, Thomas Bondo; Lindh, Roland

    2009-06-09

    The accuracy of auxiliary basis sets derived by Cholesky decompositions of the electron repulsion integrals is assessed in a series of benchmarks on total ground state energies and dipole moments of a large test set of molecules. The test set includes molecules composed of atoms from the first three rows of the periodic table as well as transition metals. The accuracy of the auxiliary basis sets are tested for the 6-31G**, correlation consistent, and atomic natural orbital basis sets at the Hartree-Fock, density functional theory, and second-order Møller-Plesset levels of theory. By decreasing the decomposition threshold, a hierarchy of auxiliary basis sets is obtained with accuracies ranging from that of standard auxiliary basis sets to that of conventional integral treatments.

  14. Mechanism Design for Task Procurement with Flexible Quality of Service

    NASA Astrophysics Data System (ADS)

    Gerding, Enrico H.; Larson, Kate; Rogers, Alex; Jennings, Nicholas R.

    In this paper, we consider the problem where an agent wishes to complete a single computational task, but lacks the required resources. Instead, it must contract self-interested service providers, who are able to flexibly manipulate the quality of service they deliver, in order to maximise their own utility. We extend an existing model to allow for multiple such service providers to be contracted for the same task, and derive optimal task procurement mechanisms in the setting where the agent has full knowledge of the cost functions of these service providers (considering both simultaneous and sequential procurement). We then extend these results to the incomplete information setting where the agent must elicit cost information from the service providers, and we characterise a family of incentive-compatible and individually-rational mechanisms. We show empirically that sequential procurement always generates greater utility for the agent compared to simultaneous procurement, and that over a range of settings, contracting multiple providers is preferable to contracting just one.

  15. Selected Collective Bargaining Agreements of Ohio Two-Year Colleges.

    ERIC Educational Resources Information Center

    National Education Association, Washington, DC.

    This collection of collective bargaining agreements contains contracts for two Ohio two-year colleges. The first agreement, between Edison State Community College and the Edison State Education Association, covers the contract period from 1989 to 1992. The 21 articles in the contract set forth provisions related to union recognition, management…

  16. Symbolic dynamics of jejunal motility in the irritable bowel

    NASA Astrophysics Data System (ADS)

    Wackerbauer, Renate; Schmidt, Thomas

    1999-09-01

    Different studies of the irritable bowel syndrome (IBS) by conventional analysis of jejunal motility report conflicting results. Therefore, our aim is to quantify the jejunal contraction activity by symbolic dynamics in order to discriminate between IBS and control subjects. Contraction amplitudes during fasting motility (phase II) are analyzed for 30 IBS and 30 healthy subjects. On the basis of a particular scale-independent discretization of the contraction amplitudes with respect to the median, IBS patients are characterized by increased block entropy as well as increased mean contraction amplitude. In a further more elementary level of analysis these differences can be reduced to specific contraction patterns within the time series, namely the fact that successive large contraction amplitudes are less ordered in IBS than in controls. These significant differences in jejunal motility may point to an altered control of the gut in IBS, although further studies on a representative number of patients have to be done for a validation of these findings.

  17. An Herbal Derivative as the Basis for a New Approach to Treating Post-Traumatic Osteoarthritis

    DTIC Science & Technology

    2017-09-01

    OA 3) A new ex vivo assay using intact joint cartilage to test ex vivo efficacy of EPRS inhibitors as therapeutics for OA. 15. SUBJECT TERMS Post ...AWARD NUMBER: W81XWH-15-1-0396 TITLE: An Herbal Derivative as the Basis for a New Approach to Treating Post - Traumatic Osteoarthritis...TITLE AND SUBTITLE An Herbal Derivative as the Basis for a New Approach to Treating Post - Traumatic Osteoarthritis 5a. CONTRACT NUMBER 5b. GRANT NUMBER

  18. Mechanisms of boron fiber strengthening by thermal treatment

    NASA Technical Reports Server (NTRS)

    Dicarlo, J. A.

    1979-01-01

    The fracture strain for boron on tungsten fibers was studied for improvement by heat treatment under vacuum or argon environments. The mechanical basis for this improvement is thermally-induced axial contraction of the entire fiber, whereby strength-controlling core flaws are compressed and fiber fracture strain increased by the value of the contraction strain. By highly sensitive measurements of fiber density and volume, the physical mechanism responsible for contraction under both environments was identified as boron atom diffusion out of the fiber sheath. The fiber contracts because the average volume of the resulting microvoid was determined to be only 0.26 plus or minus 0.09 the average atomic volume of the removed atom. The basic and practical implications of these results are discussed with particular emphasis on the theory, use, and limitations of heat-induced contraction as a simple cost-effective secondary processing method.

  19. Contractility of glycerinated Amoeba proteus and Chaos-chaos.

    PubMed

    Rinaldi, R; Opas, M; Hrebenda, B

    1975-05-01

    Immediate contact with large volumes of cold 50% (v/v) buffered glycerol preserved typical ameboid shape of Chaos chaos and Amoeba proteus with no visible distortions. These technics allowed determination of the contraction sites in these glycerinated models upon applications of ATP-Ca-Mg-solutions. The ectoplasmic tube was the main site of contraction. Preliminary EM investigations revealed thick and thin filaments, associated with the ectoplasmic tube near the plasma-lemma, which appeared to be the basis for the contractility of the ectoplasmic tube. There was no predominant contraction of the pseudopodial tips or the endoplasm in these models. The changes of volume were as much as 50%, and in some cases were not accompanied by any change in the length of the ameba; however, lengthwise contractions of the ectoplasmic tube in some amebae occurred to as much as 25%. The data substantiate a basic requirement of the ectoplasmic tube contraction theory of ameboid locomotion.

  20. 48 CFR 244.202-2 - Considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Consent to Subcontracts 244.202-2 Considerations. (a) Where other than lowest price is the basis for subcontractor selection, has...

  1. 48 CFR 319.501 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... acquisition strategy and either concur or not concur with the Contracting Officer's recommendation. The PCR...'s recommendation. If the Contracting Officer disapproves the SBS's or the PCR's set-aside...

  2. 17 CFR 240.3b-13 - Definition of eligible OTC derivative instrument.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... purchase or sale of a security on a firm basis; or (2) Provides, in whole or in part, on a firm or... derivative instrument means any contract, agreement, or transaction that: (1) Provides, in whole or in part, on a firm or contingent basis, for the purchase or sale of, or is based on the value of, or any...

  3. 17 CFR 240.3b-13 - Definition of eligible OTC derivative instrument.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... purchase or sale of a security on a firm basis; or (2) Provides, in whole or in part, on a firm or... derivative instrument means any contract, agreement, or transaction that: (1) Provides, in whole or in part, on a firm or contingent basis, for the purchase or sale of, or is based on the value of, or any...

  4. 17 CFR 240.3b-13 - Definition of eligible OTC derivative instrument.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... purchase or sale of a security on a firm basis; or (2) Provides, in whole or in part, on a firm or... derivative instrument means any contract, agreement, or transaction that: (1) Provides, in whole or in part, on a firm or contingent basis, for the purchase or sale of, or is based on the value of, or any...

  5. 26 CFR 1.818-4 - Election with respect to life insurance reserves computed on preliminary term basis.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 8 2011-04-01 2011-04-01 false Election with respect to life insurance reserves... Provisions § 1.818-4 Election with respect to life insurance reserves computed on preliminary term basis. (a) In general. Section 818(c) permits a life insurance company issuing contracts with respect to which...

  6. 13 CFR 125.19 - When may a contracting officer set-aside a procurement for SDVO SBCs?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... terms of quality and delivery and award will be made at fair market prices. This requirement does not... terms of quality and delivery and award will be made at fair market prices. However, after conducting market research, the contracting officer shall first consider a set-aside or sole source award (if the...

  7. 41 CFR 102-34.285 - Where can we obtain help in setting up a maintenance program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROPERTY 34-MOTOR VEHICLE MANAGEMENT Scheduled Maintenance of Motor Vehicles § 102-34.285 Where can we... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Where can we obtain help in setting up a maintenance program? 102-34.285 Section 102-34.285 Public Contracts and Property...

  8. Using an iterative eigensolver to compute vibrational energies with phase-spaced localized basis functions.

    PubMed

    Brown, James; Carrington, Tucker

    2015-07-28

    Although phase-space localized Gaussians are themselves poor basis functions, they can be used to effectively contract a discrete variable representation basis [A. Shimshovitz and D. J. Tannor, Phys. Rev. Lett. 109, 070402 (2012)]. This works despite the fact that elements of the Hamiltonian and overlap matrices labelled by discarded Gaussians are not small. By formulating the matrix problem as a regular (i.e., not a generalized) matrix eigenvalue problem, we show that it is possible to use an iterative eigensolver to compute vibrational energy levels in the Gaussian basis.

  9. 46 CFR Sec. 13 - Insurance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 13 Insurance. Article 9 of the NSA-LUMPSUMREP Contract sets forth the Contractor's liabilities and obligations with...

  10. 46 CFR Sec. 13 - Insurance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 13 Insurance. Article 9 of the NSA-LUMPSUMREP Contract sets forth the Contractor's liabilities and obligations with...

  11. 46 CFR Sec. 13 - Insurance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 13 Insurance. Article 9 of the NSA-LUMPSUMREP Contract sets forth the Contractor's liabilities and obligations with...

  12. 46 CFR Sec. 13 - Insurance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 13 Insurance. Article 9 of the NSA-LUMPSUMREP Contract sets forth the Contractor's liabilities and obligations with...

  13. 46 CFR Sec. 13 - Insurance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 13 Insurance. Article 9 of the NSA-LUMPSUMREP Contract sets forth the Contractor's liabilities and obligations with...

  14. [What is professionalism?].

    PubMed

    Ohbu, Sadayoshi

    2012-01-01

    What is a profession? According to Cruess, it is an occupation whose core element is work that is based on the mastery of a complex body of knowledge and skills. It is a vocation in which knowledge of some department of science or learning, or the practice of an art founded on it, is used in the service of others. Its members profess a commitment to competence, integrity, morality, altruism, and the promotion of the public good within their domain. These commitments form the basis of a social contract between a profession and society, which in return grants the profession autonomy in practice and the privilege of self-regulation. Although medical professionals share the role of healer, there are wide variations between individuals. Professionalism is the basis of medicine's contract with society. Public trust is essential to that contract, and public trust depends on the integrity of both individual professionals and the whole profession. The introduction to this important symposium includes definitions of professions and of medical professionalism. It also includes discussions of reciprocal altruism, conflicts of interest in medical societies, the theory of cognitive dissonance, and the moral foundations of professionalism.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rossi, Tuomas P., E-mail: tuomas.rossi@alumni.aalto.fi; Sakko, Arto; Puska, Martti J.

    We present an approach for generating local numerical basis sets of improving accuracy for first-principles nanoplasmonics simulations within time-dependent density functional theory. The method is demonstrated for copper, silver, and gold nanoparticles that are of experimental interest but computationally demanding due to the semi-core d-electrons that affect their plasmonic response. The basis sets are constructed by augmenting numerical atomic orbital basis sets by truncated Gaussian-type orbitals generated by the completeness-optimization scheme, which is applied to the photoabsorption spectra of homoatomic metal atom dimers. We obtain basis sets of improving accuracy up to the complete basis set limit and demonstrate thatmore » the performance of the basis sets transfers to simulations of larger nanoparticles and nanoalloys as well as to calculations with various exchange-correlation functionals. This work promotes the use of the local basis set approach of controllable accuracy in first-principles nanoplasmonics simulations and beyond.« less

  16. 48 CFR 37.101 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...), social services, health and mental health care, child (day) care, education (whether or not directly... on an individual or organizational basis. Some of the areas in which service contracts are found...

  17. Developing a Brief Method for the Simultaneous Assessment of Anaerobic and Aerobic Fitness

    DTIC Science & Technology

    2007-10-01

    production may have a common metabolic basis. Isolated muscle fibers contracting at low frequencies in oxygenated solutions (31, 42) and in vivo muscle active...the rate of stimulation or recruiting additional muscle fibers (24). The progressive increase in neuromuscular activity characteristic of high-force...used (19). During isometric contractions of unfatigued limb muscles , force production is modulated by recruitment for outputs of up to 85% of the

  18. Proceedings of the REAPS Technical Symposium (6th) Held in San Diego, California on September 11-13, 1979

    DTIC Science & Technology

    1979-09-01

    of skilled workers . Recently, one yard was denied a contract by MarAd on the basis that a facility did not actually have a skilled...provide two medium -size diese l engines ins tead of the s ingle engine in the or ig inal des ign, Levingston contracted with IHI for on -site design... available information, which would reside on the computer ready for use

  19. Naval Procurement Problems: Theory and Practice

    DTIC Science & Technology

    1982-01-01

    contrast when construction is contracted for the product may be modified before delivery and new information of relevance to both parties may be learned en...defense policy which may be desirable. For example, what price are we willing to pay for flexibility and surge capacity is a defense policy question...work force by an order of magnitude and achieve the productivity used as a basis for contract pricing was a primary factor in the schedule slippage

  20. Managing the financial risk of low water levels in Great Lakes with index-based contracts

    NASA Astrophysics Data System (ADS)

    Meyer, E.; Characklis, G. W.; Brown, C. M.; Moody, P.

    2014-12-01

    Low water levels in the Great Lakes have recently had significant financial impacts on the region's commercial shipping, responsible for transporting millions of dollars' worth of bulk goods each year. Low lake levels can significantly affect shipping firms, as cargo capacity is a function of draft, or the distance between water level and the ship's bottom. Draft increases with weight, and lower lake levels force ships to reduce cargo to prevent running aground in shallow harbors, directly impacting the finances of shipping companies. Risk transfer instruments may provide adaptable, yet unexplored, alternatives for managing these financial risks, at significantly less expense than more traditional solutions (e.g., dredging). Index-based financial instruments can be particularly attractive as contract payouts are directly linked to well-defined transparent metrics (e.g., lake levels), eliminating the need for subjective adjustors, as well as concerns over moral hazard. In developing such instruments, a major challenge is identifying an index that is well correlated with financial losses, and thus a contract that reliably pays out when losses are experienced (low basis risk). In this work, a relationship between lake levels and shipping revenues is developed, and actuarial analyses of the frequency and magnitude of revenue losses is completed using this relationship and synthetic water level data. This analysis is used to develop several types of index-based contracts. A standardized suite of binary contracts is developed, with each indexed to lake levels and priced according to predefined thresholds. These are combined to form portfolios with different objectives (e.g. options, collars), with optimal portfolio structure and length of coverage determined by limiting basis risk and contract cost, using simulations over the historic dataset. Results suggest that portfolios of these binary contracts can substantially reduce the risk of financial losses during periods of low lake level at a cost of only 1-3% of total revenues.

  1. Minority business bidding for local government contracts: the complexity of availability.

    PubMed

    Bangs, Ralph L; Murrell, Audrey; Constance-Huggins, Monique

    2007-01-01

    While minority-business enterprises (MBEs) have gained some access to local government contracts during the last three decades, these firms continue to receive a small share of local government contract spending relative to the number of available firms. Researchers have suggested two general explanations for the low representation of MBEs in contract awards: (1) lack of qualifications and capacity among MBEs, and (2) public and private discrimination against MBEs in contracting processes. This study on prime contract opportunities in a Northern central city and county with a large minority population finds that low bid rates greatly contribute to the low MBE shares of prime contracts and that bidding is reduced by both local government processes and characteristics of the firms. Some implications of these findings are that local governments need to: (1) monitor MBE shares of prime contract bids by size of contract and use share of bids as one measure of program and organizational effectiveness; (2) identify MBEs that are qualified for prime contracts and encourage and help interested firms to submit competitive bids; and (3) ensure that local government policies and practices do not diminish access to information about prime contract opportunities for qualified and interested minority firms. Another implication is that bidders lists should not be a primary basis for determining MBE availability, since many qualified and interested MBEs do not bid because of perceived barriers in local government.

  2. Effective empirical corrections for basis set superposition error in the def2-SVPD basis: gCP and DFT-C

    NASA Astrophysics Data System (ADS)

    Witte, Jonathon; Neaton, Jeffrey B.; Head-Gordon, Martin

    2017-06-01

    With the aim of mitigating the basis set error in density functional theory (DFT) calculations employing local basis sets, we herein develop two empirical corrections for basis set superposition error (BSSE) in the def2-SVPD basis, a basis which—when stripped of BSSE—is capable of providing near-complete-basis DFT results for non-covalent interactions. Specifically, we adapt the existing pairwise geometrical counterpoise (gCP) approach to the def2-SVPD basis, and we develop a beyond-pairwise approach, DFT-C, which we parameterize across a small set of intermolecular interactions. Both gCP and DFT-C are evaluated against the traditional Boys-Bernardi counterpoise correction across a set of 3402 non-covalent binding energies and isomerization energies. We find that the DFT-C method represents a significant improvement over gCP, particularly for non-covalently-interacting molecular clusters. Moreover, DFT-C is transferable among density functionals and can be combined with existing functionals—such as B97M-V—to recover large-basis results at a fraction of the cost.

  3. 48 CFR 27.201-2 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... all R&D solicitations and contracts for which the primary purpose is R&D work, except that this... exclusively for R&D work. (3) Use the clause with its Alternate II in solicitations and contracts for... schedule set by a regulatory body. (b) Insert the clause at 52.227-2, Notice and Assistance Regarding...

  4. 36 CFR 223.47 - Date of completion of permanent road construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber Sale Contracts Contract Conditions and Provisions § 223.47 Date of... obligations as set forth in the Notice of Sale shall be incorporated into the timber sale contract. (b) This...

  5. 48 CFR 433.203-70 - Civilian Board of Contract Appeals.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Civilian Board of Contract Appeals. 433.203-70 Section 433.203-70 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE... Contract Appeals, together with its Rules of Procedure, are set out in 48 CFR part 6101. [72 FR 31438, June...

  6. 48 CFR 433.203-70 - Civilian Board of Contract Appeals.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Civilian Board of Contract Appeals. 433.203-70 Section 433.203-70 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE... Contract Appeals, together with its Rules of Procedure, are set out in 48 CFR part 6101. [72 FR 31438, June...

  7. 48 CFR 433.203-70 - Civilian Board of Contract Appeals.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Civilian Board of Contract Appeals. 433.203-70 Section 433.203-70 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE... Contract Appeals, together with its Rules of Procedure, are set out in 48 CFR part 6101. [72 FR 31438, June...

  8. 48 CFR 433.203-70 - Civilian Board of Contract Appeals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Civilian Board of Contract Appeals. 433.203-70 Section 433.203-70 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE... Contract Appeals, together with its Rules of Procedure, are set out in 48 CFR part 6101. [72 FR 31438, June...

  9. What Does the Student Psychological Contract Mean? Evidence from a UK Business School

    ERIC Educational Resources Information Center

    Koskina, Aikaterini

    2013-01-01

    Much has been written about psychological contracts in organisational contexts but very little in educational settings, especially within higher education. Using an exploratory single case study this article provides qualitative empirical evidence about the ways in which the psychological contract is perceived by a group of postgraduate students…

  10. Long-Term Opioid Contract Use for Chronic Pain Management in Primary Care Practice. A Five Year Experience

    PubMed Central

    Lamb, Geoffrey C.; Neuner, Joan M.

    2007-01-01

    Background The use of opioid medications to manage chronic pain is complex and challenging, especially in primary care settings. Medication contracts are increasingly being used to monitor patient adherence, but little is known about the long-term outcomes of such contracts. Objective To describe the long-term outcomes of a medication contract agreement for patients receiving opioid medications in a primary care setting. Design Retrospective cohort study. Subjects All patients placed on a contract for opioid medication between 1998 and 2003 in an academic General Internal Medicine teaching clinic. Measurements Demographics, diagnoses, opiates prescribed, urine drug screens, and reasons for contract cancellation were recorded. The association of physician contract cancellation with patient factors and medication types were examined using the Chi-square test and multivariate logistic regression. Results A total of 330 patients constituting 4% of the clinic population were placed on contracts during the study period. Seventy percent were on indigent care programs. The majority had low back pain (38%) or fibromyalgia (23%). Contracts were discontinued in 37%. Only 17% were cancelled for substance abuse and noncompliance. Twenty percent discontinued contract voluntarily. Urine toxicology screens were obtained in 42% of patients of whom 38% were positive for illicit substances. Conclusions Over 60% of patients adhered to the contract agreement for opioids with a median follow-up of 22.5 months. Our experience provides insight into establishing a systematic approach to opioid administration and monitoring in primary care practices. A more structured drug testing strategy is needed to identify nonadherent patients. PMID:17372797

  11. 48 CFR 1335.014 - Government property and title.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... primary purpose is the conduct of scientific research is set forth in CAM 1301.70. ... CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 1335.014 Government property and title. The...

  12. 48 CFR 1335.014 - Government property and title.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... primary purpose is the conduct of scientific research is set forth in CAM 1301.70. ... CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 1335.014 Government property and title. The...

  13. 48 CFR 1649.101-71 - FEHBP termination for convenience clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 1649.101-71 FEHBP termination for convenience clause. The clause set forth in...

  14. The psychological contracts of National Health Service nurses.

    PubMed

    Purvis, Lynne J; Cropley, Mark

    2003-03-01

    Following the psychological contract model of the employee-employer exchange relationship is offered as a means of understanding the expectations of a UK sample of 223 National Health Service (NHS) nurses in association with their leaving intentions. A pilot study involving 21 NHS nurses, using the repertory grid technique was conducted to elicit contract expectations. Twenty-nine categories of expectation were identified through content analysis. The study proper, employed a survey developed on the basis of results from the pilot study to identify contract profiles among 223 nurses from three London/South-east NHS hospitals, using the Q-sort method. Type of contract held (relational/transactional), satisfaction (job and organization), and leaving intentions were also examined. Q-analysis yielded four contract profiles among the nurses sampled: 'self-development and achievement'; 'belonging and development'; 'competence and collegiality' and 'autonomy and development'. Correlation analysis demonstrated that leaving intentions were associated with a need for personal autonomy and development, and the violation of expectations for being appreciated, valued, recognized and rewarded for effort, loyalty, hard-work and achievement, negative endorsement of a relational contract, positive endorsement of a transactional contract, and job and organizational dissatisfaction. Findings illustrate the diagnostic utility of the term psychological contract for understanding the expectations of NHS nurses. The potential significance of these findings for managing nurse retention is highlighted.

  15. Enhanced Core Noise Modeling for Turbofan Engines

    NASA Technical Reports Server (NTRS)

    Stone, James R.; Krejsa, Eugene A.; Clark, Bruce J.

    2011-01-01

    This report describes work performed by MTC Technologies (MTCT) for NASA Glenn Research Center (GRC) under Contract NAS3-00178, Task Order No. 15. MTCT previously developed a first-generation empirical model that correlates the core/combustion noise of four GE engines, the CF6, CF34, CFM56, and GE90 for General Electric (GE) under Contract No. 200-1X-14W53048, in support of GRC Contract NAS3-01135. MTCT has demonstrated in earlier noise modeling efforts that the improvement of predictive modeling is greatly enhanced by an iterative approach, so in support of NASA's Quiet Aircraft Technology Project, GRC sponsored this effort to improve the model. Since the noise data available for correlation are total engine noise spectra, it is total engine noise that must be predicted. Since the scope of this effort was not sufficient to explore fan and turbine noise, the most meaningful comparisons must be restricted to frequencies below the blade passage frequency. Below the blade passage frequency and at relatively high power settings jet noise is expected to be the dominant source, and comparisons are shown that demonstrate the accuracy of the jet noise model recently developed by MTCT for NASA under Contract NAS3-00178, Task Order No. 10. At lower power settings the core noise became most apparent, and these data corrected for the contribution of jet noise were then used to establish the characteristics of core noise. There is clearly more than one spectral range where core noise is evident, so the spectral approach developed by von Glahn and Krejsa in 1982 wherein four spectral regions overlap, was used in the GE effort. Further analysis indicates that the two higher frequency components, which are often somewhat masked by turbomachinery noise, can be treated as one component, and it is on that basis that the current model is formulated. The frequency scaling relationships are improved and are now based on combustor and core nozzle geometries. In conjunction with the Task Order No. 10 jet noise model, this core noise model is shown to provide statistical accuracy comparable to the jet noise model for frequencies below blade passage. This model is incorporated in the NASA FOOTPR code and a user s guide is provided.

  16. 48 CFR 1649.101-72 - FEHBP termination for default clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 1649.101-72 FEHBP termination for default clause. The clause set forth in 1652...

  17. The Theoretical Transition Probabilities Between the B(sup 3)Pi(sub g) and the A(sup 3)Sigma(Sup +, sub u), W(sup 3)Delta(sub u), B'(sup 3)Sigma(sup -, sub u) States of N2

    NASA Technical Reports Server (NTRS)

    Thuemmel, Helmar T.; Partridge, Harry; Huo, Winifred M.; Langhoff, Stephen (Technical Monitor)

    1995-01-01

    The electronic transition moment functions between the B(sup 3)Pi(sub g) and the A(sup 3)Sigma(sup +, sub u), W(sup 3)Delta(sub u), B'(sup 3)Sigma(sup -, sub u) states of N2 are studied using the internally contracted multireference configuration interaction (ICMRCI) method based upon complete active space SCF (CASSCF) reference wave-functions. The dependence of the moments on both the one and n-particle basis sets has been investigated in detail. The calculated radiative lifetimes for the vibrational levels of B(sup 3)Pi(sub g) are in excellent agreement with the most recent measurement of Euler and Pipkin (1983)

  18. Public Private Partnerships, Corporate Welfare or Building the Nation's Scientific Infrastructure?

    NASA Astrophysics Data System (ADS)

    Shank, C. V.

    1996-03-01

    A debate is taking place in the U.S. concerning the investment of scarce Federal funds in science and technology research. Clouding this discussion is the proliferation of extreme views illustrated in the title of this talk. The impacts of the end of the cold war, the globalization of the economy and the realities of the budget deficit create a situation that cries out for a new social contract between scientists and taxpayers. We need to examine the successes and failures of the last 50 years to form the basis for a set of principles to enable the creation of a new consensus to define the roles of industry, government, universities and national laboratories in the research enterprise. The scientific infrastructure, and by extension, the economic vitality of the U.S., are at risk.

  19. Molecular structure of the lithium enolate of acetaldehyde

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynch, T.J.; Newcomb, M.; Bergbreiter, D.E.

    1980-11-21

    Calculations of the structures of isomers of the lithium enolate of acetaldehyde done at the restricted Hartree-Fock level with the HONDO program on the CDC 7600 are reported. Using the standard 4-31 G basis set, these calculations produce excessively large bond angles, and this favors the most open of the three isomeric structures. Including the polarization functions on the carbons and oxygen and using the recent Dunning and Hayes (3s2p/2s) contraction indicates that the chirol enolates are the lowest energy structure. However, the differences of the various enolate structures are small and could be modified by solvent effects. These resultsmore » are proported to suggest that the enolates containing internal ligands may be prepared such that a new chirol center would exist by virtue of the counterion position. (BLM)« less

  20. A potential energy surface for the process H2 + H2O yielding H + H + H2O - Ab initio calculations and analytical representation

    NASA Technical Reports Server (NTRS)

    Schwenke, David W.; Walch, Stephen P.; Taylor, Peter R.

    1991-01-01

    Extensive ab initio calculations on the ground state potential energy surface of H2 + H2O were performed using a large contracted Gaussian basis set and a high level of correlation treatment. An analytical representation of the potential energy surface was then obtained which reproduces the calculated energies with an overall root-mean-square error of only 0.64 mEh. The analytic representation explicitly includes all nine internal degrees of freedom and is also well behaved as the H2 dissociates; it thus can be used to study collision-induced dissociation or recombination of H2. The strategy used to minimize the number of energy calculations is discussed, as well as other advantages of the present method for determining the analytical representation.

  1. Quantum Dynamics with Short-Time Trajectories and Minimal Adaptive Basis Sets.

    PubMed

    Saller, Maximilian A C; Habershon, Scott

    2017-07-11

    Methods for solving the time-dependent Schrödinger equation via basis set expansion of the wave function can generally be categorized as having either static (time-independent) or dynamic (time-dependent) basis functions. We have recently introduced an alternative simulation approach which represents a middle road between these two extremes, employing dynamic (classical-like) trajectories to create a static basis set of Gaussian wavepackets in regions of phase-space relevant to future propagation of the wave function [J. Chem. Theory Comput., 11, 8 (2015)]. Here, we propose and test a modification of our methodology which aims to reduce the size of basis sets generated in our original scheme. In particular, we employ short-time classical trajectories to continuously generate new basis functions for short-time quantum propagation of the wave function; to avoid the continued growth of the basis set describing the time-dependent wave function, we employ Matching Pursuit to periodically minimize the number of basis functions required to accurately describe the wave function. Overall, this approach generates a basis set which is adapted to evolution of the wave function while also being as small as possible. In applications to challenging benchmark problems, namely a 4-dimensional model of photoexcited pyrazine and three different double-well tunnelling problems, we find that our new scheme enables accurate wave function propagation with basis sets which are around an order-of-magnitude smaller than our original trajectory-guided basis set methodology, highlighting the benefits of adaptive strategies for wave function propagation.

  2. Polarization functions for the modified m6-31G basis sets for atoms Ga through Kr.

    PubMed

    Mitin, Alexander V

    2013-09-05

    The 2df polarization functions for the modified m6-31G basis sets of the third-row atoms Ga through Kr (Int J Quantum Chem, 2007, 107, 3028; Int J. Quantum Chem, 2009, 109, 1158) are proposed. The performances of the m6-31G, m6-31G(d,p), and m6-31G(2df,p) basis sets were examined in molecular calculations carried out by the density functional theory (DFT) method with B3LYP hybrid functional, Møller-Plesset perturbation theory of the second order (MP2), quadratic configuration interaction method with single and double substitutions and were compared with those for the known 6-31G basis sets as well as with the other similar 641 and 6-311G basis sets with and without polarization functions. Obtained results have shown that the performances of the m6-31G, m6-31G(d,p), and m6-31G(2df,p) basis sets are better in comparison with the performances of the known 6-31G, 6-31G(d,p) and 6-31G(2df,p) basis sets. These improvements are mainly reached due to better approximations of different electrons belonging to the different atomic shells in the modified basis sets. Applicability of the modified basis sets in thermochemical calculations is also discussed. © 2013 Wiley Periodicals, Inc.

  3. On Optimum Power Allocation for Multi-Antenna Wideband Helicopter-to-Ground Communications

    DTIC Science & Technology

    2014-03-01

    optimum [1]. In frequency selective fading, the general approach is to use OFDM and apply these techniques on a per subcarrier basis. This work was...Contracting Office under contract W900KK-09-C-0016. Given the constraints described above, OFDM is often of limited interest in helicopter-to-ground...Naguib, and R. Calderbank, “Finite-length MIMO decision feedback equalization for space-time block-coded signals over multipath-fading channels,” IEEE

  4. Access to primary care for socio-economically disadvantaged older people in rural areas: A qualitative study

    PubMed Central

    Turley, Rachel; Porter, Tom; Shakespeare, Tom; Wong, Geoff; Jones, Andy P.; Steel, Nick

    2018-01-01

    Objective We aim to explore the barriers to accessing primary care for socio-economically disadvantaged older people in rural areas. Methods Using a community recruitment strategy, fifteen people over 65 years, living in a rural area, and receiving financial support were recruited for semi-structured interviews. Four focus groups were held with rural health professionals. Interviews and focus groups were audio-recorded and transcribed. Thematic analysis was used to identify barriers to primary care access. Findings Older people’s experience can be understood within the context of a patient perceived set of unwritten rules or social contract–an individual is careful not to bother the doctor in return for additional goodwill when they become unwell. However, most found it difficult to access primary care due to engaged telephone lines, availability of appointments, interactions with receptionists; breaching their perceived social contract. This left some feeling unwelcome, worthless or marginalised, especially those with high expectations of the social contract or limited resources, skills and/or desire to adapt to service changes. Health professionals’ described how rising demands and expectations coupled with service constraints had necessitated service development, such as fewer home visits, more telephone consultations, triaging calls and modifying the appointment system. Conclusion Multiple barriers to accessing primary care exist for this group. As primary care is re-organised to reduce costs, commissioners and practitioners must not lose sight of the perceived social contract and models of care that form the basis of how many older people interact with the service. PMID:29509811

  5. Industry self-regulation to improve student health: quantifying changes in beverage shipments to schools.

    PubMed

    Wescott, Robert F; Fitzpatrick, Brendan M; Phillips, Elizabeth

    2012-10-01

    We developed a data collection and monitoring system to independently evaluate the self-regulatory effort to reduce the number of beverage calories available to children during the regular and extended school day. We have described the data collection procedures used to verify data supplied by the beverage industry and quantified changes in school beverage shipments. Using a proprietary industry data set collected in 2005 and semiannually in 2007 through 2010, we measured the total volume of beverage shipments to elementary, middle, and high schools to monitor intertemporal changes in beverage volumes, the composition of products delivered to schools, and portion sizes. We compared data with findings from existing research of the school beverage landscape and a separate data set based on contracts between schools and beverage bottling companies. Between 2004 and the 2009-2010 school year, the beverage industry reduced calories shipped to schools by 90%. On a total ounces basis, shipments of full-calorie soft drinks to schools decreased by 97%. Industry self-regulation, with the assistance of a transparent and independent monitoring process, can be a valuable tool in improving public health outcomes.

  6. Delicious Heart-Healthy Latino Recipes

    MedlinePlus

    ... prohibits discrimination on the basis of age by contractors and subcontractors in the performance of Federal contracts, ... Executive Order 11246 states that no federally funded contractor may discriminate against any employee or applicant for ...

  7. 13 CFR 124.503 - How does SBA accept a procurement for award through the 8(a) BD program?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... market research, the contracting officer shall first consider a set-aside or sole source award (if the... market research conducted. In addition, the contracting officer must document the contract file showing... factors such as the results of market research, programmatic needs specific to the procuring agency...

  8. 48 CFR 1322.302 - Liquidated damages and overtime pay.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Contract Work Hours and Safety... subcontractor inadvertently violated the Contract Work Hours and Safety Standards Act is set forth in CAM 1301...

  9. 48 CFR 1322.302 - Liquidated damages and overtime pay.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Contract Work Hours and Safety... subcontractor inadvertently violated the Contract Work Hours and Safety Standards Act is set forth in CAM 1301...

  10. Approaching the basis set limit for DFT calculations using an environment-adapted minimal basis with perturbation theory: Formulation, proof of concept, and a pilot implementation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mao, Yuezhi; Horn, Paul R.; Mardirossian, Narbe

    2016-07-28

    Recently developed density functionals have good accuracy for both thermochemistry (TC) and non-covalent interactions (NC) if very large atomic orbital basis sets are used. To approach the basis set limit with potentially lower computational cost, a new self-consistent field (SCF) scheme is presented that employs minimal adaptive basis (MAB) functions. The MAB functions are optimized on each atomic site by minimizing a surrogate function. High accuracy is obtained by applying a perturbative correction (PC) to the MAB calculation, similar to dual basis approaches. Compared to exact SCF results, using this MAB-SCF (PC) approach with the same large target basis set producesmore » <0.15 kcal/mol root-mean-square deviations for most of the tested TC datasets, and <0.1 kcal/mol for most of the NC datasets. The performance of density functionals near the basis set limit can be even better reproduced. With further improvement to its implementation, MAB-SCF (PC) is a promising lower-cost substitute for conventional large-basis calculations as a method to approach the basis set limit of modern density functionals.« less

  11. Simple and efficient LCAO basis sets for the diffuse states in carbon nanostructures.

    PubMed

    Papior, Nick R; Calogero, Gaetano; Brandbyge, Mads

    2018-06-27

    We present a simple way to describe the lowest unoccupied diffuse states in carbon nanostructures in density functional theory calculations using a minimal LCAO (linear combination of atomic orbitals) basis set. By comparing plane wave basis calculations, we show how these states can be captured by adding long-range orbitals to the standard LCAO basis sets for the extreme cases of planar sp 2 (graphene) and curved carbon (C 60 ). In particular, using Bessel functions with a long range as additional basis functions retain a minimal basis size. This provides a smaller and simpler atom-centered basis set compared to the standard pseudo-atomic orbitals (PAOs) with multiple polarization orbitals or by adding non-atom-centered states to the basis.

  12. Simple and efficient LCAO basis sets for the diffuse states in carbon nanostructures

    NASA Astrophysics Data System (ADS)

    Papior, Nick R.; Calogero, Gaetano; Brandbyge, Mads

    2018-06-01

    We present a simple way to describe the lowest unoccupied diffuse states in carbon nanostructures in density functional theory calculations using a minimal LCAO (linear combination of atomic orbitals) basis set. By comparing plane wave basis calculations, we show how these states can be captured by adding long-range orbitals to the standard LCAO basis sets for the extreme cases of planar sp 2 (graphene) and curved carbon (C60). In particular, using Bessel functions with a long range as additional basis functions retain a minimal basis size. This provides a smaller and simpler atom-centered basis set compared to the standard pseudo-atomic orbitals (PAOs) with multiple polarization orbitals or by adding non-atom-centered states to the basis.

  13. Health promotion, psychological distress, and disease prevention in the workplace: a cross-sectional study of Italian adults.

    PubMed

    Ramaci, Tiziana; Pellerone, Monica; Ledda, Caterina; Rapisarda, Venerando

    2017-01-01

    Job insecurity resulting from new types of employment contracts, together with organizational dynamics such as restructuring and internationalization, is emerging as an important source of organizational and individual stress, often transforming the workplace into a hostile and, above all, extremely demanding context from a psychological point of view. The aim of this study was to identify the possible relationships between individual and organizational dimensions of work (such as engagement, autonomy, personal and collective efficacy at work, and satisfaction) and their impact on stress levels. The survey involved 120 Italian workers: 72 females (60%) and 48 males (40%), with a mean age of 41.8 years ±7.31 years. The groups of participants were selected on the basis of employment contract type (traditional or atypical) to emphasize potential differences. The study was conducted using a set of self-administered questionnaires, including the Psychological Stress Measure and Utrecht Work Engagement Scale. The data show that personal and collective efficacy at work correlates negatively with stress, which in turn correlates negatively with engagement and satisfaction. The results support the hypothesis that job insecurity could be considered a strong predictor of poor health. The study should be considered as a preliminary assessment prior to studies of broader interventions to increase quality of life.

  14. Effect of Preactivation on Torque Enhancement by the Stretch-Shortening Cycle in Knee Extensors

    PubMed Central

    Fukutani, Atsuki; Misaki, Jun; Isaka, Tadao

    2016-01-01

    The stretch-shortening cycle is one of the most interesting topics in the field of sport sciences, because the performance of human movement is enhanced by the stretch-shortening cycle (eccentric contraction). The purpose of the present study was to examine whether the influence of preactivation on the torque enhancement by stretch-shortening cycle in knee extensors. Twelve men participated in this study. The following three conditions were conducted for knee extensors: (1) concentric contraction without preactivation (CON), (2) concentric contraction with eccentric preactivation (ECC), and (3) concentric contraction with isometric preactivation (ISO). Muscle contractions were evoked by electrical stimulation to discard the influence of neural activity. The range of motion of the knee joint was set from 80 to 140 degrees (full extension = 180 degrees). Angular velocities of the concentric and eccentric contractions were set at 180 and 90 degrees/s, respectively. In the concentric contraction phase, joint torques were recorded at 85, 95, and 105 degrees, and they were compared among the three conditions. In the early phase (85 degrees) of concentric contraction, the joint torque was larger in the ECC and ISO conditions than in the CON condition. However, these clear differences disappeared in the later phase (105 degrees) of concentric contraction. The results showed that joint torque was clearly different among the three conditions in the early phase whereas this difference disappeared in the later phase. Thus, preactivation, which is prominent in the early phase of contractions, plays an important role in torque enhancement by the stretch-shortening cycle in knee extensors. PMID:27414804

  15. 23 CFR 636.512 - What is the basis for the source selection decision?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Discussions, Proposal Revisions and Source Selection... decision on a comparative assessment of proposals against all selection criteria in the solicitation. While...

  16. 23 CFR 636.512 - What is the basis for the source selection decision?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Discussions, Proposal Revisions and Source Selection... decision on a comparative assessment of proposals against all selection criteria in the solicitation. While...

  17. 23 CFR 636.512 - What is the basis for the source selection decision?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Discussions, Proposal Revisions and Source Selection... decision on a comparative assessment of proposals against all selection criteria in the solicitation. While...

  18. 23 CFR 636.512 - What is the basis for the source selection decision?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Discussions, Proposal Revisions and Source Selection... decision on a comparative assessment of proposals against all selection criteria in the solicitation. While...

  19. 23 CFR 636.512 - What is the basis for the source selection decision?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Discussions, Proposal Revisions and Source Selection... decision on a comparative assessment of proposals against all selection criteria in the solicitation. While...

  20. 42 CFR 438.1 - Basis and scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... strategy; (v) Specifies certain prohibitions aimed at the prevention of fraud and abuse; (vi) Provides that... depending on the type of entity and on the authority under which the State contracts with the entity...

Top