available ions we have to know, in advance, what ions and LETs you plan to use. Please use the Time Request fill-in form to let us know which ions you will be using. In addition to the maximum energies, ranges . Calendar To see the TVDG run schedule. Time Request Fill-in form to schedule beam time and let us know the
Request for a Test Exposure of OPERA Targets in the NuMI Beam
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kodama, K.; /Aichi U.; Tzanakos, G.
2004-11-01
We request to use the Fermilab NuMI neutrino beam in the MINOS Near Detector Hall to produce neutrino interactions in two separate detector arrangements using prototype target bricks designed for the OPERA experiment. OPERA is scheduled to to begin taking data in the CERN Neutrinos to Gran Sasso (CNGS) beam in 2006. The proposed test set up would be located just upstream of the MINOS Near Detector. The data will be used to validate the OPERA analysis scheme and to study backward particle production in neutrino interactions, which is of interest to the OPERA collaboration as well as the neutrinomore » community in general. In addition, we contend that the data taken in this exposure may also be useful to the MINOS collaboration as additional input to the understanding of the initial composition of the neutrino beam. Ideally, this exposure could take place in early to mid-2005, providing timely feedback to both the OPERA and MINOS collaborations.« less
Review on high current 2.45 GHz electron cyclotron resonance sources (invited).
Gammino, S; Celona, L; Ciavola, G; Maimone, F; Mascali, D
2010-02-01
The suitable source for the production of intense beams for high power accelerators must obey to the request of high brightness, stability, and reliability. The 2.45 GHz off-resonance microwave discharge sources are the ideal device to generate the requested beams, as they produce multimilliampere beams of protons, deuterons, and monocharged ions, remaining stable for several weeks without maintenance. A description of different technical designs will be given, analyzing their strength, and weakness, with regard to the extraction system and low energy beam transport line, as the presence of beam halo is detrimental for the accelerator.
Beam Loss Monitoring for LHC Machine Protection
NASA Astrophysics Data System (ADS)
Holzer, Eva Barbara; Dehning, Bernd; Effnger, Ewald; Emery, Jonathan; Grishin, Viatcheslav; Hajdu, Csaba; Jackson, Stephen; Kurfuerst, Christoph; Marsili, Aurelien; Misiowiec, Marek; Nagel, Markus; Busto, Eduardo Nebot Del; Nordt, Annika; Roderick, Chris; Sapinski, Mariusz; Zamantzas, Christos
The energy stored in the nominal LHC beams is two times 362 MJ, 100 times the energy of the Tevatron. As little as 1 mJ/cm3 deposited energy quenches a magnet at 7 TeV and 1 J/cm3 causes magnet damage. The beam dumps are the only places to safely dispose of this beam. One of the key systems for machine protection is the beam loss monitoring (BLM) system. About 3600 ionization chambers are installed at likely or critical loss locations around the LHC ring. The losses are integrated in 12 time intervals ranging from 40 μs to 84 s and compared to threshold values defined in 32 energy ranges. A beam abort is requested when potentially dangerous losses are detected or when any of the numerous internal system validation tests fails. In addition, loss data are used for machine set-up and operational verifications. The collimation system for example uses the loss data for set-up and regular performance verification. Commissioning and operational experience of the BLM are presented: The machine protection functionality of the BLM system has been fully reliable; the LHC availability has not been compromised by false beam aborts.
Recent charge-breeding developments with EBIS/T devices (invited).
Schwarz, S; Lapierre, A
2016-02-01
Short breeding times, narrow charge state distributions, low background, high efficiency, and the flexible time structure of the ejected low-emittance ion pulses are among the most attractive features of electron beam ion source or trap (EBIS/T) based charge breeders. Significant progress has been made to further improve these properties: Several groups are working to increase current densities towards 10(3) or even 10(4) A/cm(2). These current densities will become necessary to deliver high charge states of heavy nuclei in a short time and/or provide sufficient space-charge capacity to handle high-current ion beams in next-generation rare-isotope beam (RIB) facilities. Efficient capture of continuous beams, attractive because of its potential of handling highest-current ion beams, has become possible with the development of high-density electron beams of >1 A. Requests for the time structure of the charge bred ion pulse range from ultra-short pulses to quasi-continuous beams. Progress is being made on both ends of this spectrum, by either dividing the extracted charge in many pulse-lets, adjusting the extraction potential for a near-uniform long pulse, or adding dedicated devices to spread the ion bunches delivered from the EBIS/T in time. Advances in EBIS/T charge state breeding are summarized, including recent results with NSCL's ReA EBIS/T charge breeder.
Recent charge-breeding developments with EBIS/T devices (invited)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schwarz, S., E-mail: schwarz@nscl.msu.edu; Lapierre, A.
Short breeding times, narrow charge state distributions, low background, high efficiency, and the flexible time structure of the ejected low-emittance ion pulses are among the most attractive features of electron beam ion source or trap (EBIS/T) based charge breeders. Significant progress has been made to further improve these properties: Several groups are working to increase current densities towards 10{sup 3} or even 10{sup 4} A/cm{sup 2}. These current densities will become necessary to deliver high charge states of heavy nuclei in a short time and/or provide sufficient space-charge capacity to handle high-current ion beams in next-generation rare-isotope beam (RIB) facilities.more » Efficient capture of continuous beams, attractive because of its potential of handling highest-current ion beams, has become possible with the development of high-density electron beams of >1 A. Requests for the time structure of the charge bred ion pulse range from ultra-short pulses to quasi-continuous beams. Progress is being made on both ends of this spectrum, by either dividing the extracted charge in many pulse-lets, adjusting the extraction potential for a near-uniform long pulse, or adding dedicated devices to spread the ion bunches delivered from the EBIS/T in time. Advances in EBIS/T charge state breeding are summarized, including recent results with NSCL’s ReA EBIS/T charge breeder.« less
Evaluation and application of a fast module in a PLC based interlock and control system
NASA Astrophysics Data System (ADS)
Zaera-Sanz, M.
2009-08-01
The LHC Beam Interlock system requires a controller performing a simple matrix function to collect the different beam dump requests. To satisfy the expected safety level of the Interlock, the system should be robust and reliable. The PLC is a promising candidate to fulfil both aspects but too slow to meet the expected response time which is of the order of μseconds. Siemens has introduced a ``so called'' fast module (FM352-5 Boolean Processor). It provides independent and extremely fast control of a process within a larger control system using an onboard processor, a Field Programmable Gate Array (FPGA), to execute code in parallel which results in extremely fast scan times. It is interesting to investigate its features and to evaluate it as a possible candidate for the beam interlock system. This paper publishes the results of this study. As well, this paper could be useful for other applications requiring fast processing using a PLC.
WITHDRAWN: Beam position alignment and its verification for therapeutic ion beams from synchrotron
NASA Astrophysics Data System (ADS)
Saraya, Y.; Takeshita, E.; Furukawa, T.; Hara, Y.; Mizushima, K.; Saotome, N.; Tansho, R.; Shirai, T.; Noda, K.
2017-09-01
This article has been withdrawn at the request of the authors. The Publisher apologizes for any inconvenience this may cause. The full Elsevier Policy on Article Withdrawal can be found at (http://www.elsevier.com/locate/withdrawalpolicy)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-08
... of R20 Short Lamps and Unavailability of Substitutes D. Request for Information I. Background The... or has special characteristics not available in substitute lamp types. Specifically, as the lamp has... manufacturers (including designated beam spread and lumen output), there are no substitute products on the...
Preparation of a primary argon beam for the CERN fixed target physics.
Küchler, D; O'Neil, M; Scrivens, R; Thomae, R
2014-02-01
The fixed target experiment NA61 in the North Area of the Super Proton Synchrotron is studying phase transitions in strongly interacting matter. Up to now they used the primary beams available from the CERN accelerator complex (protons and lead ions) or fragmented beams created from the primary lead ion beam. To explore a wider range of energies and densities a request was made to provide primary argon and xenon beams. This paper describes the results of the setting up and 10 week test run of the Ar(11+) beam from the 14.5 GHz ECR ion source and the linear accelerator (Linac3) at CERN.
Beamed-Energy Propulsion (BEP) Study
NASA Technical Reports Server (NTRS)
George, Patrick; Beach, Raymond
2012-01-01
The scope of this study was to (1) review and analyze the state-of-art in beamed-energy propulsion (BEP) by identifying potential game-changing applications, (2) formulate a roadmap of technology development, and (3) identify key near-term technology demonstrations to rapidly advance elements of BEP technology to Technology Readiness Level (TRL) 6. The two major areas of interest were launching payloads and space propulsion. More generally, the study was requested and structured to address basic mission feasibility. The attraction of beamed-energy propulsion (BEP) is the potential for high specific impulse while removing the power-generation mass. The rapid advancements in high-energy beamed-power systems and optics over the past 20 years warranted a fresh look at the technology. For launching payloads, the study concluded that using BEP to propel vehicles into space is technically feasible if a commitment to develop new technologies and large investments can be made over long periods of time. From a commercial competitive standpoint, if an advantage of beamed energy for Earth-to-orbit (ETO) is to be found, it will rest with smaller, frequently launched payloads. For space propulsion, the study concluded that using beamed energy to propel vehicles from low Earth orbit to geosynchronous Earth orbit (LEO-GEO) and into deep space is definitely feasible and showed distinct advantages and greater potential over current propulsion technologies. However, this conclusion also assumes that upfront infrastructure investments and commitments to critical technologies will be made over long periods of time. The chief issue, similar to that for payloads, is high infrastructure costs.
Preparation of a primary argon beam for the CERN fixed target physics
DOE Office of Scientific and Technical Information (OSTI.GOV)
Küchler, D., E-mail: detlef.kuchler@cern.ch; O’Neil, M.; Scrivens, R.
2014-02-15
The fixed target experiment NA61 in the North Area of the Super Proton Synchrotron is studying phase transitions in strongly interacting matter. Up to now they used the primary beams available from the CERN accelerator complex (protons and lead ions) or fragmented beams created from the primary lead ion beam. To explore a wider range of energies and densities a request was made to provide primary argon and xenon beams. This paper describes the results of the setting up and 10 week test run of the Ar{sup 11+} beam from the 14.5 GHz ECR ion source and the linear acceleratormore » (Linac3) at CERN.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Younger, F.C.
1986-08-01
A design and fabrication effort for a beam director is documented. The conceptual design provides for the beam to pass first through a bending and focusing system (or ''achromat''), through a second achromat, through an air-to-vacuum interface (the ''beam window''), and finally through the vernier steering system. Following an initial concept study for a beam director, a prototype permanent magnet 30/sup 0/ beam-bending achromat and prototype vernier steering magnet were designed and built. In volume II, copies are included of the funding instruments, requests for quotations, purchase orders, a complete set of as-built drawings, magnetic measurement reports, the concept designmore » report, and the final report on the design and fabrication project. (LEW)« less
NASA Hitchhiker Program Customer Payload Requirements (CPR)
NASA Technical Reports Server (NTRS)
Horan, Stephen
1998-01-01
The mission objective is to demonstrate each of the three types of technology intended for future small-satellite communications system design. Each experiment in the overall package is designed to exercise a different technology objective that may be found in the overall satellite communications and telemetry system design. The data communications through TORSS portion is designed to demonstrate that low-power communications systems with non-gimbaled antenna systems can transport significant quantities of data through TDRSS to the ground based on only transmitting through a TDRS when the experiment is near the TDRS subsatellite point. The remaining time. the payload communications system is not active. The demand access experiment is to demonstrate that the request for a demand access service can be transmitted through TDRS and received and decoded at the ground station. In this mode, the TDRS does not track the experiment but signal processing components at the White Sands Complex are used to detect and track the transmitted request. The laser communications experiment is designed to demonstrate passive transmission of telemetry data from the experiment. This mode uses a ground-based laser source to illuminate the experiment and modulate the beam with the data. Ground-based reception recovers the data from the reflected beam back to the ground station.
Remote Operation of the Fermilab/NICADD Photoinjector
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nikolai Barov et al.
2002-03-21
The recognition that a new major HEP facility must receive international support and that its execution would benefit from worldwide interaction from design through operation has given rise to the term Global Accelerator Network (GAN). A welcome consequence has been a more permissive attitude toward remote operation of existing facilities.For roughly thirty years, the computer has been the principal operator interface to the beam,and, through the development of the Internet, the operator can be literally anywhere. In this note, the authors describe their approach to enabling a sufficient degree of operation of the photoinjector from afar in order to carrymore » out investigations in beam physics. The goal was to do so on a time scale of a few months and at minimal cost. At this writing, remote shifts are routinely scheduled involving DESY and LBL, limited in frequency only by the requests of the collaborators and by the need for time to interpret the data.« less
ER@CEBAF: A test of 5-pass energy recovery at CEBAF
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bogacz, S. A.; Douglas, D.; Dubbe, C.
2016-06-06
Jefferson Lab personnel have broad expertise in the design, commissioning, and operation of multiple energy recovery linacs (ERLs): the CEBAF Front-End Test (early 1990s), CEBAF-ER (2003), the IR Free Electron Laser (FEL) Demo, the IR FEL Upgrade, and the UV FEL Driver (1997-2014). Continued development of this core competency has led to this collaborative proposal to explore the forefronts of ERL technology at high energy in a unique expansion of CEBAF capability to a 5-pass ERL with negligible switchover time and programmatic impact to the CEBAF physics program. Such a capability would enable world-class studies of open issues in high-energymore » ERL beam dynamics that are relevant to future facilities such as electron-ion colliders (EICs). This proposal requests support from the CEBAF Program Advisory Committee to seek funding for hardware installation, and a prospective 12 days of beam time circa Fall 2018 for commissioning this high-energy multi-pass ERL experiment in CEBAF.« less
Picosecond resolution on relativistic heavy ions' time-of-flight measurement
NASA Astrophysics Data System (ADS)
Ebran, A.; Taieb, J.; Belier, G.; Chatillon, A.; Laurent, B.; Martin, J.-F.; Pellereau, E.
2013-11-01
We developed a time-of-flight measurement system for relativistic heavy ions with a requested resolution of 40 ps Full Width Half Maximum. Such a resolution is mandatory to assign the correct mass number to every fission fragment, identified using the Bρ-ToF-ΔE method with the recoil spectrometer designed for the SOFIA experiment-which hold very recently at GSI. To achieve such a performance, fast plastic scintillators read-out by dedicated photomultiplier tubes were chosen among other possible options. We have led several test-measurements from 2009 to 2011, in order to investigate: the effect of the addition of a quenching molecule in the scintillator's matrix, the influence of the detector's size and the impact of the photomultiplier tube. The contribution of the dedicated electronics is also characterized. Time-of-flight measurements were performed realized with electron pulses and relativistic heavy ions, respectively provided by the LASER driven electron-accelerator (ELSA) at CEA-DAM Ile-de-France and by the SIS18/FRS facility at GSI. The reported results exhibit a time resolution better than 20 ps Full Width Half Maximum reached with the last prototype at GSI with an Uranium beam. These results confirm that the SOFIA experiment should enable the measurement of the relativistic fission fragments' time-of-flight with the requested resolution.
NASA Astrophysics Data System (ADS)
Qiu, Yongfeng; Liu, Jinliang; Yang, Jianhua; Cheng, Xinbing; Yang, Xiao
2017-08-01
A compact control system based on Delphi and Field Programmable Gate Array(FPGA) is developed for a repetitive intense electron-beam accelerator(IEBA), whose output power is 10GW and pulse duration is 160ns. The system uses both hardware and software solutions. It comprises a host computer, a communication module and a main control unit. A device independent applications programming interface, devised using Delphi, is installed on the host computer. Stability theory of voltage in repetitive mode is analyzed and a detailed overview of the hardware and software configuration is presented. High voltage experiment showed that the control system fulfilled the requests of remote operation and data-acquisition. The control system based on a time-sequence control method is used to keep constant of the voltage of the primary capacitor in every shot, which ensured the stable and reliable operation of the electron beam accelerator in the repetitive mode during the experiment. Compared with the former control system based on Labview and PIC micro-controller developed in our laboratory, the present one is more compact, and with higher precision in the time dimension. It is particularly useful for automatic control of IEBA in the high power microwave effects research experiments where pulse-to-pulse reproducibility is required.
Laser Beam Failure Mode Effects and Analysis (FMEA) of the Solid State Heat Capacity Laser (SSHCL)
DOE Office of Scientific and Technical Information (OSTI.GOV)
King, J.
2015-09-07
A laser beam related FMEA of the SSHCL was performed to determine potential personnel and equipment safety issues. As part of the FMEA, a request was made to test a sample of the drywall material used for walls in the room for burn-through. This material was tested with a full power beam for five seconds. The surface paper material burned off and the inner calcium carbonate turned from white to brown. The result of the test is shown in the photo below.
Hybrid Automated Diagnosis of Discrete/Continuous Systems
NASA Technical Reports Server (NTRS)
Park, Han; James, Mark; MacKey, Ryan; Cannon, Howard; Bajwa, Anapa; Maul, William
2007-01-01
A recently conceived method of automated diagnosis of a complex electromechanical system affords a complete set of capabilities for hybrid diagnosis in the case in which the state of the electromechanical system is characterized by both continuous and discrete values (as represented by analog and digital signals, respectively). The method is an integration of two complementary diagnostic systems: (1) beacon-based exception analysis for multi-missions (BEAM), which is primarily useful in the continuous domain and easily performs diagnoses in the presence of transients; and (2) Livingstone, which is primarily useful in the discrete domain and is typically restricted to quasi-steady conditions. BEAM has been described in several prior NASA Tech Briefs articles: "Software for Autonomous Diagnosis of Complex Systems" (NPO-20803), Vol. 26, No. 3 (March 2002), page 33; "Beacon-Based Exception Analysis for Multimissions" (NPO-20827), Vol. 26, No. 9 (September 2002), page 32; "Wavelet-Based Real-Time Diagnosis of Complex Systems" (NPO-20830), Vol. 27, No. 1 (January 2003), page 67; and "Integrated Formulation of Beacon-Based Exception Analysis for Multimissions" (NPO-21126), Vol. 27, No. 3 (March 2003), page 74. Briefly, BEAM is a complete data-analysis method, implemented in software, for real-time or off-line detection and characterization of faults. The basic premise of BEAM is to characterize a system from all available observations and train the characterization with respect to normal phases of operation. The observations are primarily continuous in nature. BEAM isolates anomalies by analyzing the deviations from nominal for each phase of operation. Livingstone is a model-based reasoner that uses a model of a system, controller commands, and sensor observations to track the system s state, and detect and diagnose faults. Livingstone models a system within the discrete domain. Therefore, continuous sensor readings, as well as time, must be discretized. To reason about continuous systems, Livingstone uses monitors that discretize the sensor readings using trending and thresholding techniques. In development of the a hybrid method, BEAM results were sent to Livingstone to serve as an independent source of evidence that is in addition to the evidence gathered by Livingstone standard monitors. The figure depicts the flow of data in an early version of a hybrid system dedicated to diagnosing a simulated electromechanical system. In effect, BEAM served as a "smart" monitor for Livingstone. BEAM read the simulation data, processed the data to form observations, and stored the observations in a file. A monitor stub synchronized the events recorded by BEAM with the output of the Livingstone standard monitors according to time tags. This information was fed to a real-time interface, which buffered and fed the information to Livingstone, and requested diagnoses at the appropriate times. In a test, the hybrid system was found to correctly identify a failed component in an electromechanical system for which neither BEAM nor Livingstone alone yielded the correct diagnosis.
Radioactive ion beam acceleration at MAFF
NASA Astrophysics Data System (ADS)
Pasini, M.; Kester, O.; Habs, D.; Groß, M.; Sieber, T.; Maier, H. J.; Assmann, W.; Krüken, R.; Faestermann, T.; Schempp, A.; Ratzinger, U.; Safvan, C. P.
2004-12-01
In April 2003, the German safety commission has given the final approval for the oper- ation of the high flux reactor FRM-II. This is an important step towards the development and installation of the Munich accelerator for fission fragments (MAFF), which will deliver highest intensities of neutron rich fission fragments. The acceleration chain of MAFF [1] consists of a charge breeder, which will deliver the ions with a mass to charge ratio of A/q ⩽ 6.3 irrespective of the mass range, and with a repetition rate of maximum 50 Hz. The LINAC operating at 10% duty cycle is composed of a 101.28 IH-RFQ, which will boost up the energy from 2.5 up to 300 keV/u, three IH-tanks that will deliver an energy of 5.4 MeV/u and 2 seven gap IH-resonators that are used to vary the final energy up to a maximum of 5.9 MeV/u. Currently beam dynamics revisions are in progress especially in the low energy section, since the experimental program has requested specific time structures of the beam for TOF experiments. The status of the beam dynamics studies as well as the status of the single components of the accelerator will be presented in this paper.
Cleaning Insertions and Collimation Challenges
NASA Astrophysics Data System (ADS)
Redaelli, S.; Appleby, R. B.; Bertarelli, A.; Bruce, R.; Jowett, J. M.; Lechner, A.; Losito, R.
High-performance collimation systems are essential for operating efficiently modern hadron machine with large beam intensities. In particular, at the LHC the collimation system ensures a clean disposal of beam halos in the superconducting environment. The challenges of the HL-LHC study pose various demanding requests for beam collimation. In this paper we review the present collimation system and its performance during the LHC Run 1 in 2010-2013. Various collimation solutions under study to address the HL-LHC requirements are then reviewed, identifying the main upgrade baseline and pointing out advanced collimation concept for further enhancement of the performance.
Experimental Aspects in Beam Characterization
NASA Astrophysics Data System (ADS)
Sona, Alberto
2004-08-01
Beam characterization is the pre-requisite of any research exploiting light beams, especially in cases involving laser beams. One can rely on the beam parameters provided by the manufacturer but often they are inadequate and/or not sufficient for the experimental data analysis. The full characterization of a laser beam can require the determination of many parameters (about ten for a generic beam); however for symmetrical beams the significant ones can reduce to only to a few. The characterization can be performed with the accuracy requested by the application and limited to the relevant parameters. The main parameters of interest will be defined and the measurement procedures and equipment will be discussed. The ISO standards consider the following parameters mainly of interest for industrial applications: 1) Beam widths, divergence angle and beam propagation ratio. 2) Power, energy density distribution 3) Parameters for stigmatic and simple astigmatic beams 4) Parameters for general astigmatic beams 5) Geometrical laser beams classification and propagation 6) Power, energy and temporal characteristics 7) Beam positional stability 8) Beam polarization 9) Spectral characteristics 10) Shape of a laser wavefront: Phase distribution All the above points will be briefly discussed as regards the experimental problems involved. Special attention will be given to the methods for measuring the intensity distribution and to the related instrumentation to derive the Beam propagation ratio, the Beam Quality factor M2 or the Beam Parameters Product. Examples of the parameters relevance for specific applications will be given. Depending on the spectral range, specific detectors are used: CCD cameras with detector arrays in the visible and near infrared, thermocameras with a single detector and scanning system for the medium and far IR. The major problems in data collection and processing will be discussed. Another new and not yet fully investigated area is the characterization of laser beam by wavefront measuring instruments. One possible approach is the use of self-referencing interferometers such as the point diffraction interferometers. Alternatively wavefront gradient measuring instruments can be used such as the Hartmann-Shack sensors. Wavefront intensity and phase joint distributions can now be measured at the same time. This can provide in addition new methods to derive the modal content. A short review of the experimental problems in this area still looking for a practical solution will be given. Note from Publisher: This article contains the abstract and references only.
Ion beam figuring technique used as final step in the manufacturing of the optics for the E-ELT
NASA Astrophysics Data System (ADS)
Ghigo, M.; Vecchi, G.; Basso, S.; Citterio, O.; Civitani, M.; Pareschi, G.; Sironi, G.
The INAF-Astronomical Observatory of Brera (INAF-OAB) is exploring the technical problems related to the ion beam figuring (IBF) of the Zerodur hexagonal mirrors (1.45 m corner to corner) of M1 for the European Extremely Large Telescope (E-ELT). As starting step a scaled down version mirror of the same material having size of 1 m corner to corner has been used to assess the relevant figuring problems. This specific mirror is spherical and has a radius of curvature of 3 m which allows a simple interferometric measurement setup. A mechanical support was designed to minimize its deformations due to gravity. The Ion Beam Figuring Facility used for this study has been recently completed in the Brera Observatory and has a figuring area of 170 cm x 140 cm. Aim of this study is the estimation and optimization of the time requested for the correction of the surface using also strategies to control the well-known thermal problems related to the Zerodur material. In this paper we report the results obtained figuring the 1 m corner-to-corner test segment.
Tessonnier, Thomas; Marcelos, Tiago; Mairani, Andrea; Brons, Stephan; Parodi, Katia
2015-01-01
In the field of radiation therapy, accurate and robust dose calculation is required. For this purpose, precise modeling of the irradiation system and reliable computational platforms are needed. At the Heidelberg Ion Therapy Center (HIT), the beamline has been already modeled in the FLUKA Monte Carlo (MC) code. However, this model was kept confidential for disclosure reasons and was not available for any external team. The main goal of this study was to create efficiently phase space (PS) files for proton and carbon ion beams, for all energies and foci available at HIT. PSs are representing the characteristics of each particle recorded (charge, mass, energy, coordinates, direction cosines, generation) at a certain position along the beam path. In order to achieve this goal, keeping a reasonable data size but maintaining the requested accuracy for the calculation, we developed a new approach of beam PS generation with the MC code FLUKA. The generated PSs were obtained using an infinitely narrow beam and recording the desired quantities after the last element of the beamline, with a discrimination of primaries or secondaries. In this way, a unique PS can be used for each energy to accommodate the different foci by combining the narrow-beam scenario with a random sampling of its theoretical Gaussian beam in vacuum. PS can also reproduce the different patterns from the delivery system, when properly combined with the beam scanning information. MC simulations using PS have been compared to simulations, including the full beamline geometry and have been found in very good agreement for several cases (depth dose distributions, lateral dose profiles), with relative dose differences below 0.5%. This approach has also been compared with measured data of ion beams with different energies and foci, resulting in a very satisfactory agreement. Hence, the proposed approach was able to fulfill the different requirements and has demonstrated its capability for application to clinical treatment fields. It also offers a powerful tool to perform investigations on the contribution of primary and secondary particles produced in the beamline. These PSs are already made available to external teams upon request, to support interpretation of their measurements.
Optical approach to design a beam-down heliostats plant
NASA Astrophysics Data System (ADS)
Fontani, Daniela; Sansoni, Paola; Francini, Franco; Jafrancesco, David
2017-06-01
The optical design development of beam-down heliostat fields is complex and timewasting. It requires the use of an optical design software package in order to evaluate the interactions between light and surfaces and the solar divergence effects. This paper proposes a three-step procedure devoted to design a beam-down heliostat field taking into account the actual technical constraints; in particular, the shaping of the field starts from the request to have a sufficient uniformity irradiance on the internal surfaces of the receiver. The procedure is applied to an effective field simulation in order to allow a better understanding of its different phases.
First test of BNL electron beam ion source with high current density electron beam
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pikin, Alexander, E-mail: pikin@bnl.gov; Alessi, James G., E-mail: pikin@bnl.gov; Beebe, Edward N., E-mail: pikin@bnl.gov
A new electron gun with electrostatic compression has been installed at the Electron Beam Ion Source (EBIS) Test Stand at BNL. This is a collaborative effort by BNL and CERN teams with a common goal to study an EBIS with electron beam current up to 10 A, current density up to 10,000 A/cm{sup 2} and energy more than 50 keV. Intensive and pure beams of heavy highly charged ions with mass-to-charge ratio < 4.5 are requested by many heavy ion research facilities including NASA Space Radiation Laboratory (NSRL) at BNL and HIE-ISOLDE at CERN. With a multiampere electron gun, themore » EBIS should be capable of delivering highly charged ions for both RHIC facility applications at BNL and for ISOLDE experiments at CERN. Details of the electron gun simulations and design, and the Test EBIS electrostatic and magnetostatic structures with the new electron gun are presented. The experimental results of the electron beam transmission are given.« less
Neutral Beam Injection in the JET Trace Tritium Experiment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Surrey, E.; Ciric, D.; Cox, S. J.
Operation of the JET Neutral Beam Injectors with tritium is described. Supplying the tritium feed via the special electrically grounded gas feed compromised the performance of the up-graded high current triode Positive Ion Neutral Injectors (PINI) due to gas starvation of the source and the methods adopted to ameliorate this effect are described. A total of 362 PINI beam pulses were requested, circulating a total of 4.73g tritium, of which 9.3mg was injected into the torus. Safety considerations required a continuous, cumulative total to be maintained of the mass of tritium adsorbed onto the cryo-pumping panel; a daily limit ofmore » 0.5g was adopted for the Trace Tritium Experiment (TTE). A subsequent clean up phase using 115keV deuterium beams completed the isotopic exchange of components in the beamline.« less
Extending solid state laser performance
NASA Astrophysics Data System (ADS)
Miesak, Ed
2017-02-01
Coherent Diode-Pumped Solid-State Orlando (CDO), formerly known as Lee Laser, headquartered in Orlando Florida produces CW and pulsed solid state lasers. Primary wavelengths include 1064 nm, 532 nm, and 355 nm. Other wavelengths produced include 1320 nm, 15xx nm, and 16xx nm. Pulse widths are in the range of singles to hundreds of nanoseconds. Average powers are in the range of a few watts to 1000 watts. Pulse repetition rates are typically in the range of 100 Hz to 100 KHz. Laser performance parameters are often modified according to customer requests. Laser parameters that can be adjusted include average power, pulse repetition rate, pulse length, beam quality, and wavelength. Laser parameters are typically cross-coupled such that adjusting one may change some or all of the others. Customers often request one or more parameters be changed without changing any of the remaining parameters. CDO has learned how to accomplish this successfully with rapid turn-around times and minimal cost impact. The experience gained by accommodating customer requests has produced a textbook of cause and effect combinations of laser components to accomplish almost any parameter change request. Understanding the relationships between component combinations provides valuable insight into lasing effects allowing designers to extend laser performance beyond what is currently available. This has led to several break through products, i.e. >150W average power 355 nm, >60W average power 6 ps 1064 nm, pulse lengths longer than 400 ns at 532 nm with average power >100W, >400W 532 nm with pulse lengths in the 100 ns range.
12 CFR 1402.27 - Aggregating requests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Information § 1402.27 Aggregating requests. A requester may not file multiple requests at the same time, each... in concert, is attempting to break a request down into a series of requests for the purpose of... reasonable is the time period over which the requests have occurred. ...
12 CFR 1402.27 - Aggregating requests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Information § 1402.27 Aggregating requests. A requester may not file multiple requests at the same time, each... in concert, is attempting to break a request down into a series of requests for the purpose of... reasonable is the time period over which the requests have occurred. ...
12 CFR 1402.27 - Aggregating requests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Information § 1402.27 Aggregating requests. A requester may not file multiple requests at the same time, each... in concert, is attempting to break a request down into a series of requests for the purpose of... reasonable is the time period over which the requests have occurred. ...
Online measurement of fluence and position for protontherapy beams
NASA Astrophysics Data System (ADS)
Benati, C.; Boriano, A.; Bourhaleb, F.; Cirio, R.; Cirrone, G. A. P.; Cornelius, I.; Cuttone, G.; Donetti, M.; Garelli, E.; Giordanengo, S.; Guérin, L.; La Rosa, A.; Luparia, A.; Marchetto, F.; Martin, F.; Meyroneinc, S.; Peroni, C.; Pittà, G.; Raffaele, L.; Sabini, M. G.; Valastro, L.
2004-09-01
Tumour therapy with proton beams has been used for several decades in many centres with very good results in terms of local control and overall survival. Typical pathologies treated with this technique are located in head and neck, eye, prostate and in general at big depths or close to critical organs. The Experimental Physics Department of the University of Turin and the local Section of INFN, in collaboration with INFN Laboratori Nazionali del Sud Catania and Centre de Protontherapie de Orsay Paris, have developed detector systems that allow the measurement of beam position and fluence, obtained in real time during beam delivery. The centre in Catania (CATANA: Centro di AdroTerapia ed Applicazioni Nucleari Avanzate) has been treating patients with eye pathologies since spring 2002 using a superconducting cyclotron accelerating protons up to 62 MeV.This kind of treatments need high-resolution monitor systems and for this reason we have developed a 256-strip segmented ionisation chamber, each strip being 400 μm wide, with a total sensitive area 13×13 cm2. The Centre de Protontherapie de Orsay (CPO) has been operational since 1991 and features a synchrocyclotron used for eye and head and neck tumours with proton beams up to 200 MeV. The monitor system has to work on a large surface and for this purpose we have designed a pixel-segmented ionisation chamber, each pixel being 5×5 mm2, for a total active area of 16×16 cm2. The results obtained with two prototypes of the pixel and strip chambers demonstrate that the detectors allow the measurement of fluence and centre of gravity as requested by clinical specifications.
NASA Astrophysics Data System (ADS)
Zeisberger, Matthias; Schneidewind, Henrik; Huebner, Uwe; Popp, Juergen; Schmidt, Markus A.
2017-03-01
Metasurfaces have revolutionized photonics due to their ability to shape phase fronts as requested and to tune beam directionality using nanoscale metallic or dielectric scatterers. Here we reveal inverse metasurfaces showing superior properties compared to their positive counterparts if transmission mode operation is considered. The key advantage of such slot-type metasurfaces is the strong reduction of light in the parallel-polarization state, making the crossed-polarization, being essential for metasurface operation, dominant and highly visible. In the experiment, we show an up to four times improvement in polarization extinction for the individual metasurface element geometry consisting of deep subwavelength nanoboomerangs with feature sizes of the order of 100 nm. As confirmed by simulations, strong plasmonic hybridization yields two spectrally separated plasmonic resonances, ultimately allowing for the desired phase and scattering engineering in transmission. Due to the design flexibility of inverse metasurfaces, a large number of highly integrated ultra-flat photonic elements can be envisioned, examples of which include monolithic lenses for telecommunications and spectroscopy, beam shaper or generator for particle trapping or acceleration or sophisticated polarization control for microscopy.
First experiment on LMJ facility: pointing and synchronisation qualification
NASA Astrophysics Data System (ADS)
Henry, Olivier; Raffestin, Didier; Bretheau, Dominique; Luttmann, Michel; Graillot, Herve; Ferri, Michel; Seguineau, Frederic; Bar, Emmanuel; Patissou, Loic; Canal, Philippe; Sautarel, Franöise; Tranquille-Marques, Yves
2017-10-01
The LMJ (Laser mega Joule) facility at the CESTA site (Aquitaine, France) is a tool designed to deliver up to 1.2 MJ at 351 nm for plasma experiments. The experiment system will include 11 diagnostics: UV and X energy balances, imagers (Streak and stripe camera, CCD), spectrometers, and a Visar/pyrometer. The facility must be able to deliver, within the hour following the shot, all the results of the plasma diagnostics, alignment images and laser diagnostic measurements. These results have to be guaranteed in terms of conformity to the request and quality of measurement. The end of 2016 was devoted to the qualification of system pointing on target and synchronization within and between beams. The shots made with two chains (divided in 4 quads - 8 laser beams) have achieved 50 µm of misalignment accuracy (chain and quad channel) and a synchronization accuracy in the order of 50 ps . The performances achieved for plasma diagnostic (in the order of less 100 µm of alignment and timing accuracy less than 150 ps) comply with expectations. At the same time the first automatic sequences were tested. They allowed a shot on target every 6h:30 and in some case twice a day by reducing preparation actions, leading to a sequence of 4h:00.
NASA Astrophysics Data System (ADS)
Semchishen, Vladimir A.; Mrochen, Michael; Seminogov, Vladimir N.; Panchenko, Vladislav Y.; Seiler, Theo
1998-04-01
Purpose: The increasing interest in a homogeneous Gaussian light beam profile for applications in ophthalmology e.g. photorefractive keratectomy (PRK) requests simple optical systems with low energy losses. Therefore, we developed the Light Shaping Beam Homogenizer (LSBH) working from UV up to mid-IR. Method: The irregular microlenses structure on a quartz surface was fabricated by using photolithography, chemical etching and chemical polishing processes. This created a three dimensional structure on the quartz substrate characterized in case of a Gaussian beam by random law distribution of individual irregularities tilts. The LSBH was realized for the 193 nm and the 2.94 micrometer wavelengths. Simulation results obtained by 3-D analysis for an arbitrary incident light beam were compared to experimental results. Results: The correlation to a numerical Gaussian fit is better than 94% with high uniformity for an incident beam with an intensity modulation of nearly 100%. In the far field the cross section of the beam shows always rotation symmetry. Transmittance and damage threshold of the LSBH are only dependent on the substrate characteristics. Conclusions: considering our experimental and simulation results it is possible to control the angular distribution of the beam intensity after LSBH with higher efficiency compared to diffraction or holographic optical elements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Times, places and requirements for requests... Individuals and Systems of Records Maintained by the Appraisal Subcommittee § 1102.102 Times, places and... individuals making requests for access to records pertaining to them. (a) Place to make request. Any request...
34 CFR 5.81 - Time for initiation of request for review.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PUBLIC PURSUANT TO PUB. L. 90-23 (Eff. until 7-14-10) Administrative Review § 5.81 Time for initiation of request for review. A person whose request has been denied may initiate a review by filing a request for... 34 Education 1 2010-07-01 2010-07-01 false Time for initiation of request for review. 5.81 Section...
42 CFR 405.942 - Time frame for filing a request for a redetermination.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 2 2010-10-01 2010-10-01 false Time frame for filing a request for a...) Redeterminations § 405.942 Time frame for filing a request for a redetermination. (a) Time frame for filing a.... (b) Extending the time frame for filing a request. General rule. If the 120 calendar day period in...
21 CFR 99.203 - Request to extend the time for completing planned studies.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 21 Food and Drugs 1 2011-04-01 2011-04-01 false Request to extend the time for completing planned... DEVICES Manufacturer's Submissions, Requests, and Applications § 99.203 Request to extend the time for... FDA under § 99.201, that FDA extend the 36-month time period for completing the studies and submitting...
21 CFR 99.203 - Request to extend the time for completing planned studies.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Request to extend the time for completing planned... DEVICES Manufacturer's Submissions, Requests, and Applications § 99.203 Request to extend the time for... FDA under § 99.201, that FDA extend the 36-month time period for completing the studies and submitting...
21 CFR 99.203 - Request to extend the time for completing planned studies.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 21 Food and Drugs 1 2012-04-01 2012-04-01 false Request to extend the time for completing planned... DEVICES Manufacturer's Submissions, Requests, and Applications § 99.203 Request to extend the time for... FDA under § 99.201, that FDA extend the 36-month time period for completing the studies and submitting...
22 CFR 706.30 - Timing of responses to requests.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 706.30 Foreign Relations OVERSEAS PRIVATE INVESTMENT CORPORATION ADMINISTRATIVE PROVISIONS INFORMATION DISCLOSURE UNDER THE FREEDOM OF INFORMATION ACT Processing of Requests § 706.30 Timing of responses to... information; (2) A request for expedited processing may be made at any time. (3) A requester who seeks...
Methodological Framework for Analysis of Buildings-Related Programs with BEAMS, 2008
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elliott, Douglas B.; Dirks, James A.; Hostick, Donna J.
The U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) develops official “benefits estimates” for each of its major programs using its Planning, Analysis, and Evaluation (PAE) Team. PAE conducts an annual integrated modeling and analysis effort to produce estimates of the energy, environmental, and financial benefits expected from EERE’s budget request. These estimates are part of EERE’s budget request and are also used in the formulation of EERE’s performance measures. Two of EERE’s major programs are the Building Technologies Program (BT) and the Weatherization and Intergovernmental Program (WIP). Pacific Northwest National Laboratory (PNNL) supports PAEmore » by developing the program characterizations and other market information necessary to provide input to the EERE integrated modeling analysis as part of PAE’s Portfolio Decision Support (PDS) effort. Additionally, PNNL also supports BT by providing line-item estimates for the Program’s internal use. PNNL uses three modeling approaches to perform these analyses. This report documents the approach and methodology used to estimate future energy, environmental, and financial benefits using one of those methods: the Building Energy Analysis and Modeling System (BEAMS). BEAMS is a PC-based accounting model that was built in Visual Basic by PNNL specifically for estimating the benefits of buildings-related projects. It allows various types of projects to be characterized including whole-building, envelope, lighting, and equipment projects. This document contains an overview section that describes the estimation process and the models used to estimate energy savings. The body of the document describes the algorithms used within the BEAMS software. This document serves both as stand-alone documentation for BEAMS, and also as a supplemental update of a previous document, Methodological Framework for Analysis of Buildings-Related Programs: The GPRA Metrics Effort, (Elliott et al. 2004b). The areas most changed since the publication of that previous document are those discussing the calculation of lighting and HVAC interactive effects (for both lighting and envelope/whole-building projects). This report does not attempt to convey inputs to BEAMS or the methodology of their derivation.« less
On the role of CFRP reinforcement for wood beams stiffness
NASA Astrophysics Data System (ADS)
Ianasi, A. C.
2015-11-01
In recent years, carbon fiber composites have been increasingly used in different ways in reinforcing structural elements. Specifically, the use of composite materials as a reinforcement for wood beams under bending loads requires paying attention to several aspects of the problem such as the number of the composite layers applied on the wood beams. Study consolidation of composites revealed that they are made by bonding fibrous material impregnated with resin on the surface of various elements, to restore or increase the load carrying capacity (bending, cutting, compression or torque) without significant damage of their rigidity. Fibers used in building applications can be fiberglass, aramid or carbon. Items that can be strengthened are concrete, brick, wood, steel and stone, and in terms of structural beams, walls, columns and floors. This paper describes an experimental study which was designed to evaluate the effect of composite material on the stiffness of the wood beams. It proposes a summary of the fundamental principles of analysis of composite materials and the design and use. The type of reinforcement used on the beams is the carbon fiber reinforced polymer (CFRP) sheet and plates and also an epoxy resin for bonding all the elements. Structural epoxy resins remain the primary choice of adhesive to form the bond to fiber-reinforced plastics and are the generally accepted adhesives in bonded CFRP-wood connections. The advantages of using epoxy resin in comparison to common wood-laminating adhesives are their gap-filling qualities and the low clamping pressures that are required to form the bond between carbon fiber plates or sheets and the wood beams. Mechanical tests performed on the reinforced wood beams showed that CFRP materials may produce flexural displacement and lifting increases of the beams. Observations of the experimental load-displacement relationships showed that bending strength increased for wood beams reinforced with CFRP composite plates and sheets compared to those without CFRP reinforcement. The main conclusion of the tests is that the tensioning forces allow beam taking a maximum load for a while, something that is particularly useful when we consider a real construction, so in case of excess lift beam, we have time to take strengthening measures and when is about a catastrophic request (earthquake) the construction remain partially functional. The experiments have shown that the method of increasing resistance of wood constructions with composite materials is good for it. The solution is easy to implement and has low costs.
Abel, Francois [Rueschlikon, CH; Iliadis, Ilias [Rueschlikon, CH; Minkenberg, Cyriel J. A. [Adliswil, CH
2009-02-03
A method for allocating pending requests for data packet transmission at a number of inputs to a number of outputs of a switching system in successive time slots, including a matching method including the steps of providing a first request information in a first time slot indicating data packets at the inputs requesting transmission to the outputs of the switching system, performing a first step in the first time slot depending on the first request information to obtain a first matching information, providing a last request information in a last time slot successive to the first time slot, performing a last step in the last time slot depending on the last request information and depending on the first matching information to obtain a final matching information, and assigning the pending data packets at the number of inputs to the number of outputs based on the final matching information.
Method and apparatus for granting processors access to a resource
Blumrich, Matthias A.; Salapura, Valentina
2010-03-16
An apparatus and method for granting one or more requesting entities access to a resource in a predetermined time interval. The apparatus includes a first circuit receiving one or more request signals, and implementing logic for assigning a priority to the one or more request signals, and, generating a set of first_request signals based on the priorities assigned. One or more priority select circuits for receiving the set of first_request signals and generating corresponding one or more fixed grant signals representing one or more highest priority request signals when asserted during the predetermined time interval. A second circuit device receives the one or more fixed grant signals generates one or more grant signals associated with one or more highest priority request signals assigned, the grant signals for enabling one or more respective requesting entities access to the resource in the predetermined time interval, wherein the priority assigned to the one or more request signals changes each successive predetermined time interval. In one embodiment, the assigned priority is based on a numerical pattern, the first circuit changing the numerical pattern with respect to the first_request signals generated at each successive predetermined time interval.
10 CFR 1303.107 - Timing of responses to requests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Timing of responses to requests. 1303.107 Section 1303.107 Energy NUCLEAR WASTE TECHNICAL REVIEW BOARD PUBLIC INFORMATION AND REQUESTS § 1303.107 Timing of... complete the request. If the extension is for more than 10 working days, the Board shall provide the...
10 CFR 1303.107 - Timing of responses to requests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Timing of responses to requests. 1303.107 Section 1303.107 Energy NUCLEAR WASTE TECHNICAL REVIEW BOARD PUBLIC INFORMATION AND REQUESTS § 1303.107 Timing of... complete the request. If the extension is for more than 10 working days, the Board shall provide the...
10 CFR 1303.107 - Timing of responses to requests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Timing of responses to requests. 1303.107 Section 1303.107 Energy NUCLEAR WASTE TECHNICAL REVIEW BOARD PUBLIC INFORMATION AND REQUESTS § 1303.107 Timing of... complete the request. If the extension is for more than 10 working days, the Board shall provide the...
10 CFR 1303.107 - Timing of responses to requests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Timing of responses to requests. 1303.107 Section 1303.107 Energy NUCLEAR WASTE TECHNICAL REVIEW BOARD PUBLIC INFORMATION AND REQUESTS § 1303.107 Timing of... complete the request. If the extension is for more than 10 working days, the Board shall provide the...
10 CFR 1303.107 - Timing of responses to requests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Timing of responses to requests. 1303.107 Section 1303.107 Energy NUCLEAR WASTE TECHNICAL REVIEW BOARD PUBLIC INFORMATION AND REQUESTS § 1303.107 Timing of... complete the request. If the extension is for more than 10 working days, the Board shall provide the...
One-Time Password Registration Key Code Request | High-Performance
Computing | NREL One-Time Password Registration Key Code Request One-Time Password Registration Key Code Request Use this form to request a one-time password (OTP) registration key code for using . Alternate Email In case there is a second email where we might contact you Phone In case we need to contact
40 CFR 1601.24 - Timing of responses to requests.
Code of Federal Regulations, 2010 CFR
2010-07-01
... an imminent threat to the life or physical safety of an individual; (ii) An urgency to inform the... affect public confidence. (2) A request for expedited processing may be made at the time of the initial... shall notify the requester of the decision. If a request for expedited treatment is granted, the request...
12 CFR 792.62 - Requests for accounting for disclosures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Requests for accounting for disclosures. 792.62... § 792.62 Requests for accounting for disclosures. At the time of the request for access or correction or at any other time, an individual may request an accounting of disclosures made of the individual's...
Ion beam development for the needs of the JYFL nuclear physics programme.
Koivisto, H; Suominen, P; Ropponen, T; Ropponen, J; Koponen, T; Savonen, M; Toivanen, V; Wu, X; Machicoane, G; Stetson, J; Zavodszky, P; Doleans, M; Spädtke, P; Vondrasek, R; Tarvainen, O
2008-02-01
The increased requirements towards the use of higher ion beam intensities motivated us to initiate the project to improve the overall transmission of the K130 cyclotron facility. With the facility the transport efficiency decreases rapidly as a function of total beam intensity extracted from the JYFL ECR ion sources. According to statistics, the total transmission efficiency is of the order of 10% for low beam intensities (I(total)< or =0.7 mA) and only about 2% for high beam intensities (I(total)>1.5 mA). Requirements towards the use of new metal ion beams for the nuclear physics experiments have also increased. The miniature oven used for the production of metal ion beams at the JYFL is not able to reach the temperature needed for the requested metal ion beams. In order to fulfill these requirements intensive development work has been performed. An inductively and a resistively heated oven has successfully been developed and both are capable of reaching temperatures of about 2000 degrees C. In addition, sputtering technique has been tested. GEANT4 simulations have been started in order to better understand the processes involved with the bremsstrahlung, which gives an extra heat load to cryostat in the case of superconducting ECR ion source. Parallel with this work, a new advanced ECR heating simulation program has been developed. In this article we present the latest results of the above-mentioned projects.
Formation of a uniform ion beam using octupole magnets for BioLEIR facility at CERN
NASA Astrophysics Data System (ADS)
Amin, T.; Barlow, R.; Ghithan, S.; Roy, G.; Schuh, S.
2018-04-01
The possibility to transform the Low Energy Ion Ring (LEIR) accelerator at CERN into a multidisciplinary, biomedical research facility (BioLEIR) was investigated based on a request from the biomedical community. BioLEIR aims to provide a unique facility with a range of fully stripped ion beams (e.g. He, Li, Be, B, C, N, O) and energies suitable for multidisciplinary biomedical, clinically-oriented research. Two horizontal and one vertical beam transport lines have been designed for transporting the extracted beam from LEIR to three experimental end-stations. The vertical beamline was designed for a maximum energy of 75 MeV/u, while the two horizontal beamlines shall deliver up to a maximum energy of 440 MeV/u. A pencil beam of 4.3 mm FWHM (Full Width Half Maximum) as well as a homogeneous broad beam of 40 × 40 mm2, with a beam homogeneity better than ±4%, are available at the first horizontal (H1) irradiation point, while only a pencil beam is available at the second horizontal (H2) and vertical (V) irradiation points. The H1 irradiation point shall be used to conduct systematic studies of the radiation effect from different ion species on cell-lines. The H1 beamline was designed to utilize two octupole magnets which transform the Gaussian beam distribution at the target location into an approximately uniformly distributed rectangular beam. In this paper, we report on the multi-particle tracking calculations performed using MAD-X software suite for the H1 beam optics to arrive at a homogeneous broad beam on target using nonlinear focusing techniques, and on those to create a Gaussian pencil beam on target by adjusting quadrupoles strengths and positions.
5 CFR 1209.8 - Filing a request for a stay.
Code of Federal Regulations, 2010 CFR
2010-01-01
... WHISTLEBLOWING Stay Requests § 1209.8 Filing a request for a stay. (a) Time of filing. An appellant may request a stay of a personnel action allegedly based on whistleblowing at any time after the appellant becomes...
NASA Astrophysics Data System (ADS)
Zink, Christof; Maaβdorf, André; Fricke, Jörg; Ressel, Peter; Maiwald, Martin; Sumpf, Bernd; Erbert, Götz; Tränkle, Günther
2018-02-01
High brightness diode lasers with a spectrally narrowband emission, several watts of output power with an almost diffraction limited beam quality are requested light sources for several applications. In this work, a monolithic master oscillator power amplifier will be presented. The resonator of the master oscillator is formed by a high-reflection DBR grating on the rear side and an internal DBR mirror. Its power is amplified in a ridge waveguide followed by a tapered section. The monolithic MOPA provides over 7 W at 1064 nm with a narrow spectral emission width below 20 pm and an almost diffraction limited beam.
Chamberlain, Lisa J; Wang, Yun; Robinson, Thomas N
2006-04-01
To examine children's screen media exposure and requests for advertised toys and food/drinks. Prospective cohort study. Twelve elementary schools in northern California. Eight hundred twenty-seven third grade children participated at baseline; 386 students in 6 schools were followed up for 20 months. None. Child self-reported requests for advertised toys and foods/drinks. At baseline, children's screen media time was significantly associated with concurrent requests for advertised toys (Spearman r = 0.15 [TV viewing] and r = 0.20 [total screen time]; both P<.001) and foods/drinks (Spearman r = 0.16 [TV viewing] and r = 0.18 [total screen time]; both P<.001). In prospective analysis, children's screen media time at baseline was significantly associated with their mean number of toy requests 7 to 20 months later (Spearman r = 0.21 [TV viewing] and r = 0.24 [total screen time]; both P<.001) and foods/drinks requests (Spearman r = 0.14 [TV viewing] and r = 0.16 [total screen time]; both P<.01). After adjusting for baseline requests and sociodemographic variables, the relationship between screen media exposure and future requests for advertised foods/drinks remained significant for total TV viewing and total screen media exposure. The relationship with future requests for toys remained significant for total screen media exposure. Screen media exposure is a prospective risk factor for children's requests for advertised products. Future experimental studies on children's health- and consumer-related outcomes are warranted.
NASA Astrophysics Data System (ADS)
Henry, Olivier; Bretheau, Dominique; Luttmann, Michel; Graillot, Herve; Ferri, Michel; Seguineau, Frederic; Bar, Emmanuel; Patissou, Loic; Canal, Phillipe; Sautarel, Françoise; Tranquille Marques, Yves; Raffestin, Didier
2016-10-01
The LMJ (Laser mega Joule) facility at the CESTA site (Aquitaine, France) is a tool designed to deliver up to 1.2 MJ at 351 nm for plasma experiments. The experiment system will include 11 diagnostics: UV and X energy balances, imagers (Streak and stripe camera, CCD), spectrometers, and a Visar/pyrometer. The facility must be able to deliver, within the hour following the shot, all the results of the plasma diagnostics, alignment images and laser diagnostic measurements. These results have to be guaranteed in terms of conformity to the request and quality of measurement. The end of 2014 was devoted to the qualification of system pointing on target and synchronization within and between beams. The shots made with one chain (divided in 2 quads - 8 laser beams) have achieved 50 µm of misalignment accuracy (chain and quad channel) and a synchronization accuracy in the order of 50 ps. The performances achieved for plasma diagnostic (in the order of less 100 µm of alignment and timing accuracy less than 150 ps) comply with expectations. At the same time the first automatic sequences were tested. They allowed a shot on target every 6h:30 and in some case twice a day by reducing preparation actions, leading to a sequence of 4h:00. These shooting sequences are managed by an operating team of 7 people helped by 3 people for security aspects.
20 CFR 10.607 - What is the time limit for requesting reconsideration?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false What is the time limit for requesting... time limit for requesting reconsideration? (a) An application for reconsideration must be sent within... application will be deemed timely if postmarked by the U.S. Postal Service within the time period allowed. If...
77 FR 70876 - Revised Guidance for Requesting One-Time Movement Approvals (OTMA)
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-27
... DEPARTMENT OF TRANSPORTATION Federal Railroad Administration Revised Guidance for Requesting One-Time Movement Approvals (OTMA) AGENCY: Federal Railroad Administration (FRA), Department of... revised guidance for requesting one-time movement approvals (OTMA) for the transportation by rail of...
41 CFR 102-37.230 - What must a letter of intent for obtaining surplus aircraft or vessels include?
Code of Federal Regulations, 2011 CFR
2011-01-01
..., name, class, size, displacement, length, beam, draft, lift capacity, and the hull or registry number... cannibalization process, how recovered parts are to be used, method of accounting for usable parts, disposition of... pilot(s) and where the vessel will be docked. If a vessel is requested for permanent docking on water or...
41 CFR 102-37.230 - What must a letter of intent for obtaining surplus aircraft or vessels include?
Code of Federal Regulations, 2012 CFR
2012-01-01
..., name, class, size, displacement, length, beam, draft, lift capacity, and the hull or registry number... cannibalization process, how recovered parts are to be used, method of accounting for usable parts, disposition of... pilot(s) and where the vessel will be docked. If a vessel is requested for permanent docking on water or...
41 CFR 102-37.230 - What must a letter of intent for obtaining surplus aircraft or vessels include?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., name, class, size, displacement, length, beam, draft, lift capacity, and the hull or registry number... cannibalization process, how recovered parts are to be used, method of accounting for usable parts, disposition of... pilot(s) and where the vessel will be docked. If a vessel is requested for permanent docking on water or...
41 CFR 102-37.230 - What must a letter of intent for obtaining surplus aircraft or vessels include?
Code of Federal Regulations, 2014 CFR
2014-01-01
..., name, class, size, displacement, length, beam, draft, lift capacity, and the hull or registry number... cannibalization process, how recovered parts are to be used, method of accounting for usable parts, disposition of... pilot(s) and where the vessel will be docked. If a vessel is requested for permanent docking on water or...
5 CFR 1631.8 - Prompt response.
Code of Federal Regulations, 2010 CFR
2010-01-01
... so advise the requester within 5 work days. The time limit for processing such a request will not... receipt of the request, unless additional time is required for one of the following reasons: (1) It is... the office processing the request (e.g., the record keeper); (2) It is necessary to search for...
External audits of electron beams using mailed TLD dosimetry: preliminary results.
Gomola, I; Van Dam, J; Isern-Verdum, J; Verstraete, J; Reymen, R; Dutreix, A; Davis, B; Huyskens, D
2001-02-01
A feasibility study has been performed to investigate the possibility of using mailed thermoluminescence dosimetry (TLD) for external audits of clinical electron beams in Europe. In the frame of the EC Network Project for Quality Assurance in Radiotherapy, instruction sheets and mailing procedures have been defined for mailed TLD dosimetry using the dedicated holder developed by a panel of experts of the International Atomic Energy Agency (IAEA). Three hundred and thirty electron beam set-ups have been checked in the reference centres and some local centres of the EC Network Project and in addition through the centres participating to the EORTC Radiotherapy Group trial 22922. The mean ratio of measured dose to stated dose is 0.2% and the standard deviation of measured dose to stated dose is 3.2%. In seven beam set-ups, deviations greater than 10% were observed (max. 66%), showing the usefulness of these checks. The results of this feasibility study (instruction sheets, mailing procedures, holder) are presently endorsed by the EQUAL-ESTRO structure in order to offer in the future to all ESTRO members the possibility to request external audits of clinical electron beams.
7 CFR 1.113 - Times, places, and requirements for identification of individuals making requests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 1 2010-01-01 2010-01-01 false Times, places, and requirements for identification of... ADMINISTRATIVE REGULATIONS Privacy Act Regulations § 1.113 Times, places, and requirements for identification of... granted that request, the requester shall present himself or herself at the time and place specified in...
Fields, Elise; Neogi, Smriti; Schoettker, Pamela J; Lail, Jennifer
2017-12-12
An improvement team from the Complex Care Center at our large pediatric medical center participated in a 60-day initiative to use Lean methodologies to standardize their processes, eliminate waste and improve the timely and reliable provision of durable medical equipment and supplies. The team used value stream mapping to identify processes needing improvement. Improvement activities addressed the initial processing of a request, provider signature on the form, returning the form to the sender, and uploading the completed documents to the electronic medical record. Data on lead time (time between receiving a request and sending the completed request to the Health Information Management department) and process time (amount of time the staff worked on the request) were collected via manual pre- and post-time studies. Following implementation of interventions, the median lead time for processing durable medical equipment and supply requests decreased from 50 days to 3 days (p < 0.0001). Median processing time decreased from 14min to 9min (p < 0.0001). The decrease in processing time realized annual cost savings of approximately $11,000. Collaborative leadership and multidisciplinary training in Lean methods allowed the CCC staff to incorporate common sense, standardize practices, and adapt their work environment to improve the timely and reliable provision of equipment and supplies that are essential for their patients. The application of Lean methodologies to processing requests for DME and supplies could also result in a natural spread to other paperwork and requests, thus avoiding delays and potential risk for clinical instability or deterioration. Copyright © 2017 Elsevier Inc. All rights reserved.
26 CFR 301.6159-1 - Agreements for payment of tax liabilities in installments.
Code of Federal Regulations, 2012 CFR
2012-04-01
... must provide, a financial condition update at any time. (vi) At any time after entering into an... the installment agreement or a request for a financial update was inaccurate or incomplete in any... financial condition update requested by the Commissioner. (3) Request by taxpayer. Upon request by a...
26 CFR 301.6159-1 - Agreements for payment of tax liabilities in installments.
Code of Federal Regulations, 2013 CFR
2013-04-01
... must provide, a financial condition update at any time. (vi) At any time after entering into an... the installment agreement or a request for a financial update was inaccurate or incomplete in any... financial condition update requested by the Commissioner. (3) Request by taxpayer. Upon request by a...
26 CFR 301.6159-1 - Agreements for payment of tax liabilities in installments.
Code of Federal Regulations, 2011 CFR
2011-04-01
... must provide, a financial condition update at any time. (vi) At any time after entering into an... the installment agreement or a request for a financial update was inaccurate or incomplete in any... financial condition update requested by the Commissioner. (3) Request by taxpayer. Upon request by a...
26 CFR 301.6159-1 - Agreements for payment of tax liabilities in installments.
Code of Federal Regulations, 2010 CFR
2010-04-01
... must provide, a financial condition update at any time. (vi) At any time after entering into an... the installment agreement or a request for a financial update was inaccurate or incomplete in any... financial condition update requested by the Commissioner. (3) Request by taxpayer. Upon request by a...
12 CFR 1301.12 - Fees for processing requests for Council records.
Code of Federal Regulations, 2014 CFR
2014-01-01
.... (2) Search services. The Council shall charge a requester for all time spent by its employees searching for records that are responsive to a request, including page-by-page or line-by-line... shall charge the requester fees for search time as follows: (i) Searches for other than electronic...
12 CFR 1301.12 - Fees for processing requests for Council records.
Code of Federal Regulations, 2013 CFR
2013-01-01
.... (2) Search services. The Council shall charge a requester for all time spent by its employees searching for records that are responsive to a request, including page-by-page or line-by-line... shall charge the requester fees for search time as follows: (i) Searches for other than electronic...
5 CFR 2638.307 - Written comment on requests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... of Government Ethics, Suite 500, 1201 New York Avenue NW., Washington, DC 20005-3917. [46 FR 2583... parties with an opportunity to submit written comment on a request for a formal advisory opinion. A time... request has been made. (b) Additional time in which to comment may be granted upon written request to or...
31 CFR 357.29 - Time required for processing transaction request.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Book-Entry Securities System (Legacy Treasury Direct) § 357.29 Time required for processing transaction request. For purposes of a transaction request affecting payment instructions with respect to a security...
Meehan, Karen; Harrison, Gail G; Afifi, Abdelmonem A; Nickel, Nathan; Jenks, Eloise; Ramirez, Anthony
2008-05-01
An electric pump loan program designed to facilitate breastfeeding for low-income mothers returning to full-time work was evaluated. All mothers were WIC participants in the Los Angeles area. Electric pump loans were made until the infant's first birthday or until the mother requested formula from WIC. Information was provided to employers on supporting breastfeeding in the workplace. A subsample of mothers who received an electric pump on return to full-time work was compared with counterparts in a wait list control group. Mothers who received an electric pump as soon as requested did not request formula until 8.8 months on average, whereas those who did not receive an electric pump requested formula on average at 4.8 months (P < .0001). Mothers who received an electric pump when requested were 5.5 (95% CI 2.0-15.1) times as likely as mothers who did not receive an electric pump to not request formula at 6 months.
Recent advances in automatic alignment system for the National Ignition Facility
NASA Astrophysics Data System (ADS)
Wilhelmsen, Karl; Awwal, Abdul A. S.; Kalantar, Dan; Leach, Richard; Lowe-Webb, Roger; McGuigan, David; Miller Kamm, Vicki
2011-03-01
The automatic alignment system for the National Ignition Facility (NIF) is a large-scale parallel system that directs all 192 laser beams along the 300-m optical path to a 50-micron focus at target chamber in less than 50 minutes. The system automatically commands 9,000 stepping motors to adjust mirrors and other optics based upon images acquired from high-resolution digital cameras viewing beams at various locations. Forty-five control loops per beamline request image processing services running on a LINUX cluster to analyze these images of the beams and references, and automatically steer the beams toward the target. This paper discusses the upgrades to the NIF automatic alignment system to handle new alignment needs and evolving requirements as related to various types of experiments performed. As NIF becomes a continuously-operated system and more experiments are performed, performance monitoring is increasingly important for maintenance and commissioning work. Data, collected during operations, is analyzed for tuning of the laser and targeting maintenance work. Handling evolving alignment and maintenance needs is expected for the planned 30-year operational life of NIF.
45 CFR 612.5 - Timing of responses to requests.
Code of Federal Regulations, 2013 CFR
2013-10-01
....5 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION AVAILABILITY OF RECORDS AND INFORMATION § 612.5 Timing of responses to requests. (a) In general. The NSF and... engaged in disseminating information. (ii) For example, a requester who is not a full-time member of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-28
... Partnership, Limited; Notice of Request for Extension of Time to Commence and Complete Construction and.... Application Type: Request for Extension of Time. b. Project No.: 12187-016. c. Date Filed: December 8, 2010. d...-year extension of time from the existing deadline of July 28, 2011 to July 28, 2013 to commence project...
Fast novel nonlinear optical NLC system with local response
NASA Astrophysics Data System (ADS)
Iljin, Andrey; Residori, Stefania; Bortolozzo, Umberto
2017-06-01
Nonlinear optical performance of a novel liquid crystalline (LC) cell has been studied in two-wave mixing experiments revealing high diffraction efficiency within extremely wide intensity range, fast recording times and spatial resolution. Photo-induced modulation of the LC order parameter resulting from trans-cis isomerisation of dye molecules causes consequent changes of refractive indices of the medium (Light-Induced Order Modification, LIOM-mechanism) and is proved to be the main mechanism of optical nonlinearity. The proposed arrangement of the electric-field-stabilised homeotropic alignment hinders the LC director reorientation, prevents appearance of surface effects and ensures the optical cell quality. The LIOM-type nonlinearity, characterised with the substantially local nonlinear optical response, could also be extended for the recording of arbitrary phase profiles as requested in several applications for light-beam manipulation, recording of dynamic volume holograms and photonic lattices.
4 CFR 201.7 - Timing of responses to requests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 4 Accounts 1 2010-01-01 2010-01-01 false Timing of responses to requests. 201.7 Section 201.7 Accounts RECOVERY ACCOUNTABILITY AND TRANSPARENCY BOARD PUBLIC INFORMATION AND REQUESTS § 201.7 Timing of... disclosed in part shall be marked or annotated to show the amount of information deleted unless doing so...
6 CFR 5.5 - Timing of responses to requests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 6 Domestic Security 1 2010-01-01 2010-01-01 false Timing of responses to requests. 5.5 Section 5.5 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY DISCLOSURE OF RECORDS AND INFORMATION Freedom of Information Act § 5.5 Timing of responses to requests. (a) In general. Components...
36 CFR 908.31 - Time for filing request for review.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Time for filing request for review. 908.31 Section 908.31 Parks, Forests, and Public Property PENNSYLVANIA AVENUE DEVELOPMENT... PENNSYLVANIA AVENUE DEVELOPMENT AREA Review Procedure § 908.31 Time for filing request for review. Any person...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-08
... for OMB Review; Comment Request; Well-being Supplement to the American Time Use Survey ACTION: Notice... information collection request (ICR) titled, ``Well-being Supplement to the American Time Use Survey,'' to the... American Time Use Survey (ATUS) Well- being supplement includes questions about how people experience their...
11 CFR 1.4 - Times, places, and requirements for identification of individuals making requests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 11 Federal Elections 1 2010-01-01 2010-01-01 false Times, places, and requirements for identification of individuals making requests. 1.4 Section 1.4 Federal Elections FEDERAL ELECTION COMMISSION PRIVACY ACT § 1.4 Times, places, and requirements for identification of individuals making requests. (a...
25 CFR 517.6 - Timing of responses to requests.
Code of Federal Regulations, 2013 CFR
2013-04-01
... FOIA Officer will respond. Unusual circumstances warranting extension are: (i) The need to search for... the office processing the request; (ii) The need to search for, collect, and appropriately examine a... conclude that a requester or group of requesters has divided a request into a series of requests on a...
25 CFR 517.6 - Timing of responses to requests.
Code of Federal Regulations, 2012 CFR
2012-04-01
... FOIA Officer will respond. Unusual circumstances warranting extension are: (i) The need to search for... the office processing the request; (ii) The need to search for, collect, and appropriately examine a... conclude that a requester or group of requesters has divided a request into a series of requests on a...
25 CFR 517.6 - Timing of responses to requests.
Code of Federal Regulations, 2011 CFR
2011-04-01
... FOIA Officer will respond. Unusual circumstances warranting extension are: (i) The need to search for... the office processing the request; (ii) The need to search for, collect, and appropriately examine a... conclude that a requester or group of requesters has divided a request into a series of requests on a...
Ion figuring of large prototype mirror segments for the E-ELT
NASA Astrophysics Data System (ADS)
Ghigo, M.; Vecchi, G.; Basso, S.; Citterio, O.; Civitani, M.; Mattaini, E.; Pareschi, G.; Sironi, G.
2014-07-01
At INAF-Astronomical Observatory of Brera a study is under way to explore the problems related to the ion beam figuring of full scale Zerodur hexagonal mirrors of M1 for the European Extremely Large Telescope (E-ELT), having size of 1.4 m corner to corner. During this study it is initially foreseen the figuring of a scaled down version mirror of the same material having size of 1 m corner to corner to assess the relevant figuring problems and issues. This specific mirror has a radius of curvature of 3 m, which allows for easy interferometric measurement. A mechanical support was designed to minimize its deformations due to the gravity. The Ion Beam Figuring Facility used for this study has been recently completed in the Brera Observatory and has a figuring area of 140 cm x 170 cm. It employs a Kaufman ion source having 50 mm grids mounted on three axis. This system has been designed and developed to be autonomous and self-monitoring during the figuring process. The software and the mathematical tools used to compute the dwell time solution have been developed at INAF-OAB as well. Aim of this study is the estimation and optimization of the time requested to correct the surface adopting strategies to mitigate the well-known thermal problems related to the Zerodur material. In this paper, the results obtained figuring the 1 m corner-to-corner test segment are reported.
50 CFR 501.4 - Requests for access-times, places and requirements for identification of individuals.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Requests for access-times, places and... COMMISSION IMPLEMENTATION OF THE PRIVACY ACT OF 1974 § 501.4 Requests for access—times, places and... any records to which that individual is entitled under the Act upon satisfactory proof of identity by...
Hanaki, Nao; Yamashita, Kazuto; Kunisawa, Susumu; Imanaka, Yuichi
2016-12-09
In Japan, ambulance staff sometimes must make request calls to find hospitals that can accept patients because of an inadequate information sharing system. This study aimed to quantify effects of the number of request calls on the time interval between an emergency call and hospital arrival. A cross-sectional study of an ambulance records database in Nara prefecture, Japan. A total of 43 663 patients (50% women; 31.2% aged 80 years and over): (1) transported by ambulance from April 2013 to March 2014, (2) aged 15 years and over, and (3) with suspected major illness. The time from call to hospital arrival, defined as the time interval from receipt of an emergency call to ambulance arrival at a hospital. The mean time interval from emergency call to hospital arrival was 44.5 min, and the mean number of requests was 1.8. Multilevel linear regression analysis showed that ∼43.8% of variations in transportation times were explained by patient age, sex, season, day of the week, time, category of suspected illness, person calling for the ambulance, emergency status at request call, area and number of request calls. A higher number of request calls was associated with longer time intervals to hospital arrival (addition of 6.3 min per request call; p<0.001). In an analysis dividing areas into three groups, there were differences in transportation time for diseases needing cardiologists, neurologists, neurosurgeons and orthopaedists. The study revealed 6.3 additional minutes needed in transportation time for every refusal of a request call, and also revealed disease-specific delays among specific areas. An effective system should be collaboratively established by policymakers and physicians to ensure the rapid identification of an available hospital for patient transportation in order to reduce the time from the initial emergency call to hospital arrival. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.
Hanaki, Nao; Yamashita, Kazuto; Kunisawa, Susumu; Imanaka, Yuichi
2016-01-01
Objectives In Japan, ambulance staff sometimes must make request calls to find hospitals that can accept patients because of an inadequate information sharing system. This study aimed to quantify effects of the number of request calls on the time interval between an emergency call and hospital arrival. Design and setting A cross-sectional study of an ambulance records database in Nara prefecture, Japan. Cases A total of 43 663 patients (50% women; 31.2% aged 80 years and over): (1) transported by ambulance from April 2013 to March 2014, (2) aged 15 years and over, and (3) with suspected major illness. Primary outcome measures The time from call to hospital arrival, defined as the time interval from receipt of an emergency call to ambulance arrival at a hospital. Results The mean time interval from emergency call to hospital arrival was 44.5 min, and the mean number of requests was 1.8. Multilevel linear regression analysis showed that ∼43.8% of variations in transportation times were explained by patient age, sex, season, day of the week, time, category of suspected illness, person calling for the ambulance, emergency status at request call, area and number of request calls. A higher number of request calls was associated with longer time intervals to hospital arrival (addition of 6.3 min per request call; p<0.001). In an analysis dividing areas into three groups, there were differences in transportation time for diseases needing cardiologists, neurologists, neurosurgeons and orthopaedists. Conclusions The study revealed 6.3 additional minutes needed in transportation time for every refusal of a request call, and also revealed disease-specific delays among specific areas. An effective system should be collaboratively established by policymakers and physicians to ensure the rapid identification of an available hospital for patient transportation in order to reduce the time from the initial emergency call to hospital arrival. PMID:27940625
24 CFR 2002.11 - Review of records, aggregating requests and waiving or reducing fees.
Code of Federal Regulations, 2013 CFR
2013-04-01
... properly assessable. Review time will be assessed at the same rates established for search time in § 15.110... reasonably believes that a requester or a group of requesters acting in concert, is attempting to break a...
12 CFR 602.16 - Combining requests.
Code of Federal Regulations, 2013 CFR
2013-01-01
....16 Combining requests. You may not avoid paying fees by filing multiple requests at the same time. When FCA reasonably believes that you, alone or with others, are breaking down a request into a series...
41 CFR 51-8.6 - Aggregating requests.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., or a group of requesters acting in concert, is attempting to break a request down into a series of... include the time period in which the requests have occurred and the subject matter involved. ...
12 CFR 602.16 - Combining requests.
Code of Federal Regulations, 2011 CFR
2011-01-01
....16 Combining requests. You may not avoid paying fees by filing multiple requests at the same time. When FCA reasonably believes that you, alone or with others, are breaking down a request into a series...
12 CFR 602.16 - Combining requests.
Code of Federal Regulations, 2012 CFR
2012-01-01
....16 Combining requests. You may not avoid paying fees by filing multiple requests at the same time. When FCA reasonably believes that you, alone or with others, are breaking down a request into a series...
41 CFR 51-8.6 - Aggregating requests.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., or a group of requesters acting in concert, is attempting to break a request down into a series of... include the time period in which the requests have occurred and the subject matter involved. ...
41 CFR 51-8.6 - Aggregating requests.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., or a group of requesters acting in concert, is attempting to break a request down into a series of... include the time period in which the requests have occurred and the subject matter involved. ...
Code of Federal Regulations, 2010 CFR
2010-04-01
...) A sponsor may request orphan-drug designation at any time in the drug development process prior to... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Timing of requests for orphan-drug designation..., DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS FOR HUMAN USE ORPHAN DRUGS Designation of an Orphan...
34 CFR 682.421 - Funds transferred from the Federal Fund to the Operating Fund by a guaranty agency.
Code of Federal Regulations, 2011 CFR
2011-07-01
... receiving the Secretary's approval, the agency may transfer the requested funds at any time within 6 months... request within 30 days after receiving it, the agency may transfer the requested funds at any time within... deposited into the agency's Operating Fund. The amount transferred and outstanding at any time during the...
34 CFR 682.421 - Funds transferred from the Federal Fund to the Operating Fund by a guaranty agency.
Code of Federal Regulations, 2013 CFR
2013-07-01
... receiving the Secretary's approval, the agency may transfer the requested funds at any time within 6 months... request within 30 days after receiving it, the agency may transfer the requested funds at any time within... deposited into the agency's Operating Fund. The amount transferred and outstanding at any time during the...
47 CFR 1.781 - Requests for extension of filing time.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Complaints, Applications, Tariffs, and Reports Involving Common Carriers Contracts, Reports, and Requests... time within which to file contracts, reports, and requests referred to in §§ 1.783 through 1.814 shall be made in writing and may be granted for good cause shown. Contracts ...
15 CFR 4.6 - Time limits and expedited processing.
Code of Federal Regulations, 2011 CFR
2011-01-01
... to the extent reasonably necessary to properly process the particular request: (i) The need to search... office processing the request; (ii) The need to search for, collect, and appropriately examine a... reasonably believes that multiple requests submitted by a requester, or by a group of requesters acting in...
15 CFR 4.6 - Time limits and expedited processing.
Code of Federal Regulations, 2013 CFR
2013-01-01
... to the extent reasonably necessary to properly process the particular request: (i) The need to search... office processing the request; (ii) The need to search for, collect, and appropriately examine a... reasonably believes that multiple requests submitted by a requester, or by a group of requesters acting in...
40 CFR 1601.24 - Timing of responses to requests.
Code of Federal Regulations, 2014 CFR
2014-07-01
... by a group of requesters acting in concert, constitute a single request that would otherwise involve... means that there is a need to: (1) Search for and collect the requested records from facilities that are separate from the office processing the request; (2) Search for, collect, and appropriately examine a...
A real-time intercepting beam-profile monitor for a medical cyclotron
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hendriks, C.; Uittenbosch, T.; Cameron, D.
2013-11-15
There is a lack of real-time continuous beam-diagnostic tools for medical cyclotrons due to high power deposition during proton irradiation. To overcome this limitation, we have developed a profile monitor that is capable of providing continuous feedback about beam shape and current in real time while it is inserted in the beam path. This enables users to optimize the beam profile and observe fluctuations in the beam over time with periodic insertion of the monitor.
25 CFR 517.6 - Timing of responses to requests.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false Timing of responses to requests. 517.6 Section 517.6 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR GENERAL PROVISIONS FREEDOM OF... material, all reasonable segregable material shall be disclosed. (e) Denial of requests. When the FOIA...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-05
... information collection request (ICR), ``American Time Use Survey,'' to the Office of Management and Budget... for OMB Review; Comment Request; American Time Use Survey ACTION: Notice. SUMMARY: The Department of... the Department of Labor, Bureau of Labor Statistics, Office of Management and Budget, Room 10235...
43 CFR 3835.92 - What if I fail to submit a timely waiver request?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false What if I fail to submit a timely waiver... MAINTENANCE FEES Defective Waivers and FLPMA Filings § 3835.92 What if I fail to submit a timely waiver request? (a) If you fail to submit a qualified waiver request (see § 3835.1) and also fail to pay an...
43 CFR 3835.92 - What if I fail to submit a timely waiver request?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false What if I fail to submit a timely waiver... MAINTENANCE FEES Defective Waivers and FLPMA Filings § 3835.92 What if I fail to submit a timely waiver request? (a) If you fail to submit a qualified waiver request (see § 3835.1) and also fail to pay an...
43 CFR 3835.92 - What if I fail to submit a timely waiver request?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false What if I fail to submit a timely waiver... MAINTENANCE FEES Defective Waivers and FLPMA Filings § 3835.92 What if I fail to submit a timely waiver request? (a) If you fail to submit a qualified waiver request (see § 3835.1) and also fail to pay an...
43 CFR 3835.92 - What if I fail to submit a timely waiver request?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false What if I fail to submit a timely waiver... MAINTENANCE FEES Defective Waivers and FLPMA Filings § 3835.92 What if I fail to submit a timely waiver request? (a) If you fail to submit a qualified waiver request (see § 3835.1) and also fail to pay an...
Magnetically operated beam dump for dumping high power beams in a neutral beamline
Dagenhart, W.K.
1984-01-27
It is an object of this invention to provide a beam dump system for a neutral beam generator which lowers the time-averaged power density of the beam dump impingement surface. Another object of this invention is to provide a beam dump system for a neutral particle beam based on reionization and subsequent magnetic beam position modulation of the beam onto a beam dump surface to lower the time-averaged power density of the beam dump ion impingement surface.
49 CFR 701.7 - Timing of responses to requests.
Code of Federal Regulations, 2014 CFR
2014-10-01
... by a requester or by a group of requesters acting in concert constitute a single request that would... circumstances that may justify delay include: (i) The need to search for and collect the requested records from other facilities that are separate from Amtrak's headquarters offices. (ii) The need to search for...
NASA Technical Reports Server (NTRS)
Chen, C. C.; Franklin, C. F.
1980-01-01
The frequency reuse capability is demonstrated for a Ku-band multiple beam antenna which provides contiguous low sidelobe spot beams for point-to-point communications between any two points within the continental United States (CONUS), or regional coverage beams for direct broadcast systems. A spot beam antenna in the 14/21 GHz band which provides contiguous overlapping beams covering CONUS and two discrete beams covering Hawaii and Alaska were designed, developed, and tested. Two reflector antennas are required for providing contiguous coverage of CONUS. Each is comprised of one offset parabolic reflector, one flat polarization diplexer, and two separate planar array feeds. This antenna system provides contiguous spot beam coverage of CONUS, utilizing 15 beams. Also designed, developed and demonstrated was a shaped contoured beam antenna system which provides contiguous four time zone coverage of CONUS from a single offset parabolic reflector incorporating one flat polarization diplexer and two separate planar array feeds. The beams which illuminate the eastern time zone and the mountain time zone are horizontally polarized, while the beams which illuminate the central time zone and the pacific time zone are vertically polarized. Frequency reuse is achieved by amplitude and polarization isolation.
32 CFR 286.29 - Collection of fees and fee rates.
Code of Federal Regulations, 2013 CFR
2013-07-01
... consists of two parts; individual time (hereafter referred to as human time), and machine time. (i) Human... support, operator, programmer, database administrator, or action officer). (ii) Machine time. Machine time... the time of providing the documents to the requester or recipient when the requester specifically...
32 CFR 286.29 - Collection of fees and fee rates.
Code of Federal Regulations, 2012 CFR
2012-07-01
... consists of two parts; individual time (hereafter referred to as human time), and machine time. (i) Human... support, operator, programmer, database administrator, or action officer). (ii) Machine time. Machine time... the time of providing the documents to the requester or recipient when the requester specifically...
32 CFR 286.29 - Collection of fees and fee rates.
Code of Federal Regulations, 2014 CFR
2014-07-01
... consists of two parts; individual time (hereafter referred to as human time), and machine time. (i) Human... support, operator, programmer, database administrator, or action officer). (ii) Machine time. Machine time... the time of providing the documents to the requester or recipient when the requester specifically...
42 CFR 478.42 - Submitting a request for a hearing.
Code of Federal Regulations, 2011 CFR
2011-10-01
... (CONTINUED) QUALITY IMPROVEMENT ORGANIZATIONS RECONSIDERATIONS AND APPEALS Utilization and Quality Control... who is a railroad retiree. (b) Time limit for submitting a request for a hearing. (1) The request for... determination, unless the time is extended for good cause as provided in § 473.22. (2) The date of receipt of...
18 CFR 1301.5 - Timing of responses to requests.
Code of Federal Regulations, 2010 CFR
2010-04-01
... expect that the decision on disclosure will be as time consuming as for requests in Tract 3. (3) Tract 3. Requests which require a decision or input from another office or agency, extensive submitter notifications... expected to pose an imminent threat to the life or physical safety of an individual; (ii) An urgency to...
40 CFR 305.21 - Amendment of request for a hearing; withdrawal.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE... Hearing. The Requestor may amend the Request for a Hearing once as a matter of right at any time before... may withdraw the Request for a Hearing, or any part thereof, without prejudice one time before the...
12 CFR 261.15 - Request for confidential treatment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... case of documents filed with a Federal Reserve Bank, with that Federal Reserve Bank) at the time the information is submitted or a reasonable time after submission. (b) Form of request. Each request for... Board shall so indicate on the face of the form or in its instructions. The data may, however, be...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 22 Foreign Relations 2 2014-04-01 2014-04-01 false Media or organization one-time requests for... GOVERNORS DOMESTIC REQUESTS FOR BROADCASTING BOARD OF GOVERNORS PROGRAM MATERIALS § 502.4 Media or... provide a broadcast-quality copy of Agency program materials to media entities, educational organizations...
5 CFR 1650.17 - Changes and cancellation of a withdrawal request.
Code of Federal Regulations, 2010 CFR
2010-01-01
... processes withdrawal requests each business day and those that are entered into the record keeping system by 12:00 noon eastern time will ordinarily be processed that night; those entered after 12:00 noon eastern time will be processed the next business day. Consequently, a cancellation request must be...
77 FR 12444 - Airworthiness Directives; General Electric Company (GE) Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-01
... support the NPRM as written. Request To Correct Part Number Commenters GE and Delta Airlines (Delta... packing configuration either on-wing or in the shop and to determine if further actions are necessary. We.... Request To Modify Compliance Time Commenters GE and Delta requested that we change the compliance time of...
11 CFR 4.7 - Requests for records.
Code of Federal Regulations, 2010 CFR
2010-01-01
... the event the time is extended, the requestor shall be notified of the reasons for the extension and... the amount of work and/or time involved in processing requests. Requests for records are processed in... to pose an imminent threat to the life or physical safety of an individual; or (ii) With respect to a...
21 CFR 1401.6 - Expedited process.
Code of Federal Regulations, 2011 CFR
2011-04-01
.... (b) A request for expedited processing may be made at the time of the initial request for records or at a later time. (c) A requester who seeks expedited processing must submit a statement, certified to...) The lack of expedited treatment could reasonably be expected to pose an imminent threat to the life or...
21 CFR 1401.6 - Expedited process.
Code of Federal Regulations, 2010 CFR
2010-04-01
.... (b) A request for expedited processing may be made at the time of the initial request for records or at a later time. (c) A requester who seeks expedited processing must submit a statement, certified to...) The lack of expedited treatment could reasonably be expected to pose an imminent threat to the life or...
Method and apparatus for timing of laser beams in a multiple laser beam fusion system
Eastman, Jay M.; Miller, Theodore L.
1981-01-01
The optical path lengths of a plurality of comparison laser beams directed to impinge upon a common target from different directions are compared to that of a master laser beam by using an optical heterodyne interferometric detection technique. The technique consists of frequency shifting the master laser beam and combining the master beam with a first one of the comparison laser beams to produce a time-varying heterodyne interference pattern which is detected by a photo-detector to produce an AC electrical signal indicative of the difference in the optical path lengths of the two beams which were combined. The optical path length of this first comparison laser beam is adjusted to compensate for the detected difference in the optical path lengths of the two beams. The optical path lengths of all of the comparison laser beams are made equal to the optical path length of the master laser beam by repeating the optical path length adjustment process for each of the comparison laser beams. In this manner, the comparison laser beams are synchronized or timed to arrive at the target within .+-.1.times.10.sup.-12 second of each other.
NASA Astrophysics Data System (ADS)
Matsuda, M.; Asozu, T.; Sataka, M.; Iwase, A.
2013-11-01
We have developed the dual beam system which accelerates two kinds of ion beams simultaneously especially for real-time ion beam analysis. We have also developed the alternating beam system which can efficiently change beam species in a short time in order to realize efficient ion beam analysis in a limited beam time. The acceleration of the dual beam is performed by the 20 UR Pelletron™ tandem accelerator in which an ECR ion source is mounted at the high voltage terminal [1,2]. The multi-charged ions of two or more elements can be simultaneously generated from the ECR ion source, so dual-beam irradiation is achieved by accelerating ions with the same charge to mass ratio (for example, 132Xe11+ and 12C+). It enables us to make a real-time beam analysis such as Rutherford Back Scattering (RBS) method, while a target is irradiated with swift heavy ions. For the quick change of the accelerating ion beam, the program of automatic setting of the optical parameter of the accelerator has been developed. The switchover time for changing the ion beam is about 5 min. These developments have been applied to the study on the ion beam mixing caused by high-density electronic excitation induced by swift heavy ions.
Preliminary Benefits Assessment of Traffic Aware Strategic Aircrew Requests (TASAR)
NASA Technical Reports Server (NTRS)
Henderson, Jeff; Idris, Husni; Wing, David J.
2012-01-01
While en route, aircrews submit trajectory change requests to air traffic control (ATC) to better meet their objectives including reduced delays, reduced fuel burn, and passenger comfort. Aircrew requests are currently made with limited to no information on surrounding traffic. Consequently, these requests are uninformed about a key ATC objective, ensuring traffic separation, and therefore less likely to be accepted than requests informed by surrounding traffic and that avoids creating conflicts. This paper studies the benefits of providing aircrews with on-board decision support to generate optimized trajectory requests that are probed and cleared of known separation violations prior to issuing the request to ATC. These informed requests are referred to as traffic aware strategic aircrew requests (TASAR) and leverage traffic surveillance information available through Automatic Dependent Surveillance Broadcast (ADS-B) In capability. Preliminary fast-time simulation results show increased benefits with longer stage lengths since beneficial trajectory changes can be applied over a longer distance. Also, larger benefits were experienced between large hub airports as compared to other airport sizes. On average, an aircraft equipped with TASAR reduced its travel time by about one to four minutes per operation and fuel burn by about 50 to 550 lbs per operation depending on the objective of the aircrew (time, fuel, or weighted combination of time and fuel), class of airspace user, and aircraft type. These preliminary results are based on analysis of approximately one week of traffic in July 2012 and additional analysis is planned on a larger data set to confirm these initial findings.
7 CFR 400.95 - Time limitations for filing and responding to requests for administrative review.
Code of Federal Regulations, 2010 CFR
2010-01-01
... demonstrate a physical inability to timely file the request for administrative review. [67 FR 13251, Mar. 22... for administrative review. 400.95 Section 400.95 Agriculture Regulations of the Department of... administrative review. (a) A request for administrative review must be filed within 30 days of receipt of written...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Time limit for WRC final determinations regarding requests for information appealed by the requester from an initial adverse determination. 701.206 Section 701.206 Conservation of Power and Water Resources WATER RESOURCES...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Time limit for WRC final determinations regarding requests for information appealed by the requester from an initial adverse determination. 701.206 Section 701.206 Conservation of Power and Water Resources WATER RESOURCES...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Time limit for WRC final determinations regarding requests for information appealed by the requester from an initial adverse determination. 701.206 Section 701.206 Conservation of Power and Water Resources WATER RESOURCES COUNCIL COUNCIL...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Time limit for WRC final determinations regarding requests for information appealed by the requester from an initial adverse determination. 701.206 Section 701.206 Conservation of Power and Water Resources WATER RESOURCES...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Time limit for WRC final determinations regarding requests for information appealed by the requester from an initial adverse determination. 701.206 Section 701.206 Conservation of Power and Water Resources WATER RESOURCES...
43 CFR 4.1364 - Time for hearing; notice of hearing; extension of time for hearing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Hearings and Appeals Request for Review of Approval Or Disapproval of Applications for New Permits, Permit Revisions, Permit Renewals, the Transfer, Assignment Or Sale of Rights Granted Under Permit (federal Program... days of the date of the filing of the request for review or amended request for review and shall...
32 CFR 701.46 - Aggregating requests.
Code of Federal Regulations, 2012 CFR
2012-07-01
... that are for a commercial use, a DON activity may not charge for the first 2 hours of search time or... same time, each seeking portions of a document or documents, solely in order to avoid payment of fees... acting in concert, is attempting to break a request down into a series of requests for the purpose of...
Laser guide star pointing camera for ESO LGS Facilities
NASA Astrophysics Data System (ADS)
Bonaccini Calia, D.; Centrone, M.; Pedichini, F.; Ricciardi, A.; Cerruto, A.; Ambrosino, F.
2014-08-01
Every observatory using LGS-AO routinely has the experience of the long time needed to bring and acquire the laser guide star in the wavefront sensor field of view. This is mostly due to the difficulty of creating LGS pointing models, because of the opto-mechanical flexures and hysteresis in the launch and receiver telescope structures. The launch telescopes are normally sitting on the mechanical structure of the larger receiver telescope. The LGS acquisition time is even longer in case of multiple LGS systems. In this framework the optimization of the LGS systems absolute pointing accuracy is relevant to boost the time efficiency of both science and technical observations. In this paper we show the rationale, the design and the feasibility tests of a LGS Pointing Camera (LPC), which has been conceived for the VLT Adaptive Optics Facility 4LGSF project. The LPC would assist in pointing the four LGS, while the VLT is doing the initial active optics cycles to adjust its own optics on a natural star target, after a preset. The LPC allows minimizing the needed accuracy for LGS pointing model calibrations, while allowing to reach sub-arcsec LGS absolute pointing accuracy. This considerably reduces the LGS acquisition time and observations operation overheads. The LPC is a smart CCD camera, fed by a 150mm diameter aperture of a Maksutov telescope, mounted on the top ring of the VLT UT4, running Linux and acting as server for the client 4LGSF. The smart camera is able to recognize within few seconds the sky field using astrometric software, determining the stars and the LGS absolute positions. Upon request it returns the offsets to give to the LGS, to position them at the required sky coordinates. As byproduct goal, once calibrated the LPC can calculate upon request for each LGS, its return flux, its fwhm and the uplink beam scattering levels.
Dynamic advance reservation with delayed allocation
Vokkarane, Vinod; Somani, Arun
2014-12-02
A method of scheduling data transmissions from a source to a destination, includes the steps of: providing a communication system having a number of channels and a number of paths, each of the channels having a plurality of designated time slots; receiving two or more data transmission requests; provisioning the transmission of the data; receiving data corresponding to at least one of the two or more data transmission requests; waiting until an earliest requested start time T.sub.s; allocating at the current time each of the two or more data transmission requests; transmitting the data; and repeating the steps of waiting, allocating, and transmitting until each of the two or more data transmission requests that have been provisioned for a transmission of data is satisfied. A system to perform the method of scheduling data transmissions is also described.
VizieR Online Data Catalog: NGC1068 interferometric mid-IR measurements (Lopez-Gonzaga+, 2017)
NASA Astrophysics Data System (ADS)
Lopez-Gonzaga, N.; Asmus, D.; Bauer, F. E.; Tristram, K. R. W.; Burtscher, L.; Marinucci, A.; Matt, G.; Harrison, F. A.
2017-06-01
Single-aperture mid-infrared images and spectra were taken with the VLT spectrometer and imager for the mid-infrared (VISIR). Interferometric measurements were obtained with the instrument MIDI at the ESO's VLTI facility. Observations with intermediate AT baselines were requested and observed during the nights of January, 10, 20, and 23, 2015 using Director's discretionary time (DDT). We additionally included published and unpublished interferometric data from our previous campaigns with the requirement that they were observed (nearly) contemporaneously to the period of X-ray variation or observed a few years before. These include observations taken on the nights of September, 21, 26, and 30, 2014, and November, 17, 2014, using Guaranteed Time Observations (GTO). For our observations we used the low-resolution NaCl prism with spectral resolution R=λ/Δλ~30 to disperse the light of the beams. A log of the observations and instrument setup can be found in Appendix A. The published data were taken from Lopez-Gonzaga et al. (2014A&A...565A..71L, Cat. J/A+A/565/A71). (2 data files).
Code of Federal Regulations, 2013 CFR
2013-01-01
... circumstances: (1) The need to search for and collect the requested records from field facilities or other establishments that are separate from the Office of the Secretary. (2) The need to search for, collect and... requester, or a group of requesters acting in concert, if the Secretary or delegate reasonably believes that...
User Accounts | High-Performance Computing | NREL
see information on user account policies. ACCOUNT PASSWORDS Logging in for the first time? Forgot your Accounts User Accounts Learn how to request an NREL HPC user account. Request an HPC Account To request an HPC account, please complete our request form. This form is provided using DocuSign. REQUEST
SU-F-J-54: Towards Real-Time Volumetric Imaging Using the Treatment Beam and KV Beam
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, M; Rozario, T; Liu, A
Purpose: Existing real-time imaging uses dual (orthogonal) kV beam fluoroscopies and may result in significant amount of extra radiation to patients, especially for prolonged treatment cases. In addition, kV projections only provide 2D information, which is insufficient for in vivo dose reconstruction. We propose real-time volumetric imaging using prior knowledge of pre-treatment 4D images and real-time 2D transit data of treatment beam and kV beam. Methods: The pre-treatment multi-snapshot volumetric images are used to simulate 2D projections of both the treatment beam and kV beam, respectively, for each treatment field defined by the control point. During radiation delivery, the transitmore » signals acquired by the electronic portal image device (EPID) are processed for every projection and compared with pre-calculation by cross-correlation for phase matching and thus 3D snapshot identification or real-time volumetric imaging. The data processing involves taking logarithmic ratios of EPID signals with respect to the air scan to reduce modeling uncertainties in head scatter fluence and EPID response. Simulated 2D projections are also used to pre-calculate confidence levels in phase matching. Treatment beam projections that have a low confidence level either in pre-calculation or real-time acquisition will trigger kV beams so that complementary information can be exploited. In case both the treatment beam and kV beam return low confidence in phase matching, a predicted phase based on linear regression will be generated. Results: Simulation studies indicated treatment beams provide sufficient confidence in phase matching for most cases. At times of low confidence from treatment beams, kV imaging provides sufficient confidence in phase matching due to its complementary configuration. Conclusion: The proposed real-time volumetric imaging utilizes the treatment beam and triggers kV beams for complementary information when the treatment beam along does not provide sufficient confidence for phase matching. This strategy minimizes the use of extra radiation to patients. This project is partially supported by a Varian MRA grant.« less
NASA Astrophysics Data System (ADS)
Jiang, Xiao-Guo; Wang, Yuan; Zhang, Kai-Zhi; Yang, Guo-Jun; Shi, Jin-Shui; Deng, Jian-Jun; Li, Jin
2014-01-01
One kind of instantaneous electron beam emittance measurement system based on the optical transition radiation principle and double imaging optical method has been set up. It is mainly adopted in the test for the intense electron-beam produced by a linear induction accelerator. The system features two characteristics. The first one concerns the system synchronization signal triggered by the following edge of the main output waveform from a Blumlein switch. The synchronous precision of about 1 ns between the electron beam and the image capture time can be reached in this way so that the electron beam emittance at the desired time point can be obtained. The other advantage of the system is the ability to obtain the beam spot and beam divergence in one measurement so that the calculated result is the true beam emittance at that time, which can explain the electron beam condition. It provides to be a powerful beam diagnostic method for a 2.5 kA, 18.5 MeV, 90 ns (FWHM) electron beam pulse produced by Dragon I. The ability of the instantaneous measurement is about 3 ns and it can measure the beam emittance at any time point during one beam pulse. A series of beam emittances have been obtained for Dragon I. The typical beam spot is 9.0 mm (FWHM) in diameter and the corresponding beam divergence is about 10.5 mrad.
information including Alternative Format Requests for Disabled Users are provided on this page. Alert Complaint Get a License or Permit Make a Payment Obtain Social Services Request Bus Information Request -menu tier. Ride On Real Time Arrival Information Requests to Discuss Property Tax Bill* Bulk Trash
TG‐51: Experience from 150 institutions, common errors, and helpful hints
Tailor, R. C.; Hanson, W. F.; Ibbott, G. S.
2003-01-01
The Radiological Physics Center (RPC) is a resource to the medical physics community for assistance regarding dosimetry procedures. Since the publication of the AAPM TG‐51 calibration protocol, the RPC has responded to numerous phone calls raising questions and describing areas in the protocol where physicists have had problems. At the beginning of the year 2000, the RPC requested that institutions participating in national clinical trials provide the change in measured beam output resulting from the conversion from the TG‐21 protocol to TG‐51. So far, the RPC has received the requested data from ~ 150 of the ~ 1300 institutions in the RPC program. The RPC also undertook a comparison of TG‐21 and TG‐51 and determined the expected change in beam calibration for ion chambers in common use, and for the range of photon and electron beam energies used clinically. Analysis of these data revealed two significant outcomes: (i) a large number (~ 1/2) of the reported calibration changes for photon and electron beams were outside the RPC's expected values, and (ii) the discrepancies in the reported versus the expected dose changes were as large as 8%. Numerous factors were determined to have contributed to these deviations. The most significant factors involved the use of plane‐parallel chambers, the mixing of phantom materials and chambers between the two protocols, and the inconsistent use of depth‐dose factors for transfer of dose from the measurement depth to the depth of dose maximum. In response to these observations, the RPC has identified a number of circumstances in which physicists might have difficulty with the protocol, including concerns related to electron calibration at low energies (R50<2cm), and the use of a cylindrical chamber at 6 MeV electrons. In addition, helpful quantitative hints are presented, including the effect of the prescribed lead filter for photon energy measurements, the impact of shifting the chamber depth for photon depth‐dose measurements, and the impact of updated stopping‐power data used in TG‐51versus that used in TG‐21, particularly for electron calibrations. PACS number(s): 87.53.–j, 87.66.–a PMID:12777144
31 CFR 103.84 - Withdrawing requests.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Withdrawing requests. 103.84 Section 103.84 Money and Finance: Treasury Regulations Relating to Money and Finance FINANCIAL RECORDKEEPING... requests. A person may withdraw a request for an administrative ruling at any time before the ruling has...
10 CFR 1703.108 - Processing of FOIA requests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Processing of FOIA requests. 1703.108 Section 1703.108 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD PUBLIC INFORMATION AND REQUESTS § 1703.108 Processing of... section to provide access to requested records shall be taken within twenty working days. This time period...
10 CFR 1703.108 - Processing of FOIA requests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Processing of FOIA requests. 1703.108 Section 1703.108 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD PUBLIC INFORMATION AND REQUESTS § 1703.108 Processing of... section to provide access to requested records shall be taken within twenty working days. This time period...
46 CFR 201.155 - Briefs; request for findings.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 8 2010-10-01 2010-10-01 false Briefs; request for findings. 201.155 Section 201.155... PRACTICE AND PROCEDURE Briefs, Requests for Findings, Decisions, Exceptions (Rule 16) § 201.155 Briefs; request for findings. The time for filing briefs to the presiding officer, and extensions thereof, shall...
10 CFR 1703.108 - Processing of FOIA requests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Processing of FOIA requests. 1703.108 Section 1703.108 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD PUBLIC INFORMATION AND REQUESTS § 1703.108 Processing of... section to provide access to requested records shall be taken within twenty working days. This time period...
10 CFR 1703.108 - Processing of FOIA requests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Processing of FOIA requests. 1703.108 Section 1703.108 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD PUBLIC INFORMATION AND REQUESTS § 1703.108 Processing of... section to provide access to requested records shall be taken within twenty working days. This time period...
10 CFR 1703.108 - Processing of FOIA requests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Processing of FOIA requests. 1703.108 Section 1703.108 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD PUBLIC INFORMATION AND REQUESTS § 1703.108 Processing of... section to provide access to requested records shall be taken within twenty working days. This time period...
A real-time beam-profile monitor for a PET cyclotron
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoehr, C.; Uittenbosch, T.; Verzilov, V.
2012-12-19
Beam profiles in medical cyclotrons are traditionally measured using techniques that do not provide any information about short-term fluctuations of the beam shape or beam intensity. To overcome this, we have developed a real-time harp beam profile monitor which can withstand beam power in excess of 300 W. The monitor and electronics were constructed and applied toward a 13 MeV proton beam with current of up to 25 {mu}A. Herein are reported preliminary beam-profile measurement results.
A real-time beam-profile monitor for a PET cyclotron
NASA Astrophysics Data System (ADS)
Hoehr, C.; Uittenbosch, T.; Verzilov, V.; English, W.; Buckley, K.; Gray, D.; Kellog, S.; Cameron, D.; Schaffer, P.
2012-12-01
Beam profiles in medical cyclotrons are traditionally measured using techniques that do not provide any information about short-term fluctuations of the beam shape or beam intensity. To overcome this, we have developed a real-time harp beam profile monitor which can withstand beam power in excess of 300 W. The monitor and electronics were constructed and applied toward a 13 MeV proton beam with current of up to 25 μA. Herein are reported preliminary beam-profile measurement results.
Effect of Film Dressing on Acute Radiation Dermatitis Secondary to Proton Beam Therapy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arimura, Takeshi, E-mail: arimura-takeshi@medipolis.org; Department of Radiology, Kagoshima University Graduate School of Medical and Dental Sciences, Kagoshima; Ogino, Takashi
Purpose: Acute radiation dermatitis (ARD) is one of the most common adverse events of proton beam therapy (PBT), and there is currently no effective method to manage ARD. The purpose of this study was to examine the prophylactic effect of a film dressing using Airwall on PBT-induced ARD compared with standard skin managements. Methods and Materials: A total of 271 patients with prostate cancer who were scheduled for PBT at our center were divided into 2 groups based on their own requests: 145 patients (53%) chose Airwall (group A) and 126 patients (47%) received standard treatments (group B). We evaluatedmore » irradiated skin every other day during PBT and followed up once a week for a month after completion of PBT. Results: Grade 0, 1, 2, and 3 dermatitis were seen in 2, 122, 21, and 0 and 0, 65, 57, and 4 patients in groups A and B, respectively (P<.001). Numbers of days to grades 1 and 2 ARD development were 34.9 ± 14.3 and 54.7 ± 10.3 and 31.8 ± 11.3 and 54.4 ± 11.6 in groups A and B, respectively. There were no significant differences between the 2 groups. Eighteen patients (12%) in group A who experienced problems in the region covered with Airwall switched to standard skin care after peeling the film off. Conclusions: Film dressing using Airwall reduced the severity of ARD without delaying the response time of the skin to proton beam irradiation compared with standard skin management. Hence, film dressing is considered a promising measure for preventing ARD secondary to PBT.« less
5 CFR 550.1405 - Crediting compensatory time off.
Code of Federal Regulations, 2011 CFR
2011-01-01
... ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1405 Crediting compensatory time off. (a) Upon a... employee is entitled to credit for compensatory time off for travel under the conditions specified in this... employee's request for credit of compensatory time off for travel may be denied if the request is not filed...
5 CFR 550.1405 - Crediting compensatory time off.
Code of Federal Regulations, 2014 CFR
2014-01-01
... ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1405 Crediting compensatory time off. (a) Upon a... employee is entitled to credit for compensatory time off for travel under the conditions specified in this... employee's request for credit of compensatory time off for travel may be denied if the request is not filed...
5 CFR 550.1405 - Crediting compensatory time off.
Code of Federal Regulations, 2012 CFR
2012-01-01
... ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1405 Crediting compensatory time off. (a) Upon a... employee is entitled to credit for compensatory time off for travel under the conditions specified in this... employee's request for credit of compensatory time off for travel may be denied if the request is not filed...
5 CFR 550.1405 - Crediting compensatory time off.
Code of Federal Regulations, 2013 CFR
2013-01-01
... ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1405 Crediting compensatory time off. (a) Upon a... employee is entitled to credit for compensatory time off for travel under the conditions specified in this... employee's request for credit of compensatory time off for travel may be denied if the request is not filed...
5 CFR 550.1405 - Crediting compensatory time off.
Code of Federal Regulations, 2010 CFR
2010-01-01
... ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1405 Crediting compensatory time off. (a) Upon a... employee is entitled to credit for compensatory time off for travel under the conditions specified in this... employee's request for credit of compensatory time off for travel may be denied if the request is not filed...
77 FR 10799 - Revised Guidance for Requesting One-Time Movement (OTM) Approvals
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-23
... DEPARTMENT OF TRANSPORTATION Federal Railroad Administration Revised Guidance for Requesting One-Time Movement (OTM) Approvals AGENCY: Federal Railroad Administration (FRA), Department of... as one-time movement approvals (OTMA). Recently, FRA revised its OTMA procedures to streamline the...
29 CFR 2201.6 - Responses to requests.
Code of Federal Regulations, 2010 CFR
2010-07-01
... information substantially change the estimated time to process a request, the requester will be notified in... given to be true and correct to the best of his or her knowledge and belief. The certification...
29 CFR 1611.4 - Times, places, and requirements for identification of individuals making requests.
Code of Federal Regulations, 2010 CFR
2010-07-01
... present sufficient personal identification (e.g., driver's license, employee identification card, social security card, credit cards). If the requester is unable to provide such identification, the requester...
7 CFR 1.6 - Aggregating requests.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., is attempting to break a request down into a series of requests for the purpose of evading the... be considered in determining whether such a belief would be reasonable is the brevity of the time...
Code of Federal Regulations, 2011 CFR
2011-07-01
... operating regulations. The inmate must submit a written request for vacation time, ordinarily two weeks in advance of the requested vacation time. The work supervisor must recommend to the SOI the vacation time to... accrued vacation time for visits, participation in institution programs or for other good reasons at the...
24 CFR 2002.17 - Time limitations.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Time limitations. 2002.17 Section... THE PUBLIC § 2002.17 Time limitations. (a) Upon receipt of a request for records, the appropriate... General of an adverse determination. (b) The time of receipt for processing a request for records purposes...
28 CFR 542.18 - Response time.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Response time. 542.18 Section 542.18... REMEDY Administrative Remedy Program § 542.18 Response time. If accepted, a Request or Appeal is... later than the third calendar day after filing. If the time period for response to a Request or Appeal...
28 CFR 542.18 - Response time.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Response time. 542.18 Section 542.18... REMEDY Administrative Remedy Program § 542.18 Response time. If accepted, a Request or Appeal is... later than the third calendar day after filing. If the time period for response to a Request or Appeal...
24 CFR 2002.17 - Time limitations.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Time limitations. 2002.17 Section... THE PUBLIC § 2002.17 Time limitations. (a) Upon receipt of a request for records, the appropriate... General of an adverse determination. (b) The time of receipt for processing a request for records purposes...
28 CFR 542.18 - Response time.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Response time. 542.18 Section 542.18... REMEDY Administrative Remedy Program § 542.18 Response time. If accepted, a Request or Appeal is... later than the third calendar day after filing. If the time period for response to a Request or Appeal...
24 CFR 2002.17 - Time limitations.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Time limitations. 2002.17 Section... THE PUBLIC § 2002.17 Time limitations. (a) Upon receipt of a request for records, the appropriate... General of an adverse determination. (b) The time of receipt for processing a request for records purposes...
24 CFR 2002.17 - Time limitations.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Time limitations. 2002.17 Section... THE PUBLIC § 2002.17 Time limitations. (a) Upon receipt of a request for records, the appropriate... General of an adverse determination. (b) The time of receipt for processing a request for records purposes...
28 CFR 542.18 - Response time.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Response time. 542.18 Section 542.18... REMEDY Administrative Remedy Program § 542.18 Response time. If accepted, a Request or Appeal is... later than the third calendar day after filing. If the time period for response to a Request or Appeal...
24 CFR 2002.17 - Time limitations.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Time limitations. 2002.17 Section... THE PUBLIC § 2002.17 Time limitations. (a) Upon receipt of a request for records, the appropriate... General of an adverse determination. (b) The time of receipt for processing a request for records purposes...
The 1998 Australian external beam radiotherapy survey and IAEA/WHO TLD postal dose quality audit.
Huntley, R; Izewska, J
2000-03-01
The results of an updated Australian survey of external beam radiotherapy centres are presented. Most of the centres provided most of the requested information. The relative caseloads of various linear accelerator photon and electron beams have not changed significantly since the previous survey in 1995. The mean age of Australian LINACs is 7.1 years and that of other radiotherapy machines is 14.7 years. Every Australian radiotherapy centre participated in a special run of the IAEA/WHO TLD postal dose quality audit program, which was provided for Australian centres by the IAEA and WHO in May 1998. The dose quoted by the centres was in nearly every case within 1.5% of the dose assessed by the IAEA. This is within the combined standard uncertainty of the IAEA TLD service (1.8%). The results confirm the accuracy and precision of radiotherapy dosimetry in Australia and the adequate dissemination of the Australian standards from ARL (now ARPANSA) to the centres. The Australian standards have recently been shown to agree with those of other countries to within 0.25% by comparison with the BIPM.
Bruggmoser, Gregor; Saum, Rainer; Kranzer, Rafael
2018-01-12
The aim of this technical communication is to provide correction factors for recombination and polarity effect for two new ionization chambers PTW PinPoint 3D (type 31022) and PTW Semiflex 3D (type 31021). The correction factors provided are for the (based on the) German DIN 6800-2 dosimetry protocol and the AAPM TG51 protocol. The measurements were made in filtered and unfiltered high-energy photon beams in a water equivalent phantom at maximum depth of the PDD and a field size on the surface of 10cm×10cm. The design of the new chamber types leads to an ion collection efficiency and a polarity effect that are well within the specifications requested by pertinent dosimetry protocols including the addendum of TG-51. It was confirmed that the recombination effect of both chambers mainly depends on dose per pulse and is independent of the filtration of the photon beam. Copyright © 2018. Published by Elsevier GmbH.
Tailor cutting of crystalline solar cells by laser micro jet
NASA Astrophysics Data System (ADS)
Bruckert, F.; Pilat, E.; Piron, P.; Torres, P.; Carron, B.; Richerzhagen, B.; Pirot, M.; Monna, R.
2012-03-01
Coupling a laser into a hair thin water micro jet (Laser Micro Jet, LMJ) for cutting applications offers a wide range of processes that are quite unique. As the laser beam is guided by internal reflections inside of a liquid cylinder, the cuts are naturally straight and do not reflect any divergence as otherwise occurs with an unguided laser beam. Furthermore, having a liquid media at the point of contact ensures a fast removal of heat and eventual debris ensuring clean cuts, which are free of any burrs. Many applications have indeed been developed for a large variety of materials, which are as different as e.g. diamond, silicon, aluminum, ceramic and hard metals. The photovoltaic industry has enjoyed in the last decades tremendous growth rates, which are still projected into the future. We focus here on the segment of Building Integrated PV (BIPV), which requests tailored solutions to actual buildings and not-one-fits-it-all standardized modules. Having the option to tailor cut solar cells opens a new field of BIPV applications. For the first time, finished crystalline solar cells have been LMJ cut into predetermined shapes. First results show that the cut is clean and neat. Preliminary solar performance measurements are positive. This opens a new avenue of tailored made modules instead of having to rely on the one-fits-alloy approach used so far.
49 CFR 7.43 - When are fees waived or reduced for records requested under subpart C of this part?
Code of Federal Regulations, 2014 CFR
2014-10-01
... first two hours of search time, unless the records are requested for commercial use. (3) Duplication of... of an immediate family member who was, at the time of death, a DOT employee. (e) DOT furnishes... processing of the request or appeal: (1) Search fees otherwise chargeable under § 7.42(h) and (j); and (2...
13 CFR 102.4 - Timing of responses to requests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... extended by an additional 10 working days for one or more of the following reasons: (1) The need to search... office processing the request; (2) The need to search for, collect, and appropriately examine a.... Where an office believes that multiple requests submitted by a requester, or by a group of collaborating...
13 CFR 102.4 - Timing of responses to requests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... extended by an additional 10 working days for one or more of the following reasons: (1) The need to search... office processing the request; (2) The need to search for, collect, and appropriately examine a.... Where an office believes that multiple requests submitted by a requester, or by a group of collaborating...
13 CFR 102.4 - Timing of responses to requests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... extended by an additional 10 working days for one or more of the following reasons: (1) The need to search... office processing the request; (2) The need to search for, collect, and appropriately examine a.... Where an office believes that multiple requests submitted by a requester, or by a group of collaborating...
13 CFR 102.4 - Timing of responses to requests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... extended by an additional 10 working days for one or more of the following reasons: (1) The need to search... office processing the request; (2) The need to search for, collect, and appropriately examine a.... Where an office believes that multiple requests submitted by a requester, or by a group of collaborating...
22 CFR 303.8 - Requests for records.
Code of Federal Regulations, 2010 CFR
2010-04-01
... treatment could reasonably be expected to pose an imminent threat to the life or physical safety of an... affect public confidence. (2) A request for expedited processing may be made at the time of the initial... Officer shall decide whether to grant the request and shall notify the requester of the decision. If a...
28 CFR 16.5 - Timing of responses to requests.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the lack of expedited treatment could reasonably be expected to pose an imminent threat to the life or... exist possible questions about the government's integrity which affect public confidence. (2) A request... component shall decide whether to grant it and shall notify the requester of the decision. If a request for...
29 CFR 70.25 - Time limits and order in which requests must be processed.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Circumstances in which the lack of expedited treatment could reasonably be expected to pose an imminent threat... media interest in which there exists possible questions about the government's integrity which affect... requester of the decision. If a request for expedited treatment is granted, the request will be given...
Children's Requests to Unfamiliar Adults: Form, Social Function, Age Variation.
ERIC Educational Resources Information Center
Gordon, David Paul; And Others
Elementary school students were required to obtain objects from two adults engaged in conversation with each other. Results differed markedly between older and younger children. For the younger children, (1) there were three times as many statement requests (SRs) as interrogative requests (IRs); (2) almost 50% of requests were need statements; (3)…
12 CFR 310.4 - Times, places, and requirements for identification of individuals making requests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... individual's identity, or an unsworn declaration subscribed to as true under the penalty of perjury under the... identification of individuals making requests. 310.4 Section 310.4 Banks and Banking FEDERAL DEPOSIT INSURANCE... for identification of individuals making requests. (a) Individuals may request access to records...
12 CFR 310.4 - Times, places, and requirements for identification of individuals making requests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... individual's identity, or an unsworn declaration subscribed to as true under the penalty of perjury under the... identification of individuals making requests. 310.4 Section 310.4 Banks and Banking FEDERAL DEPOSIT INSURANCE... for identification of individuals making requests. (a) Individuals may request access to records...
12 CFR 310.4 - Times, places, and requirements for identification of individuals making requests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... individual's identity, or an unsworn declaration subscribed to as true under the penalty of perjury under the... identification of individuals making requests. 310.4 Section 310.4 Banks and Banking FEDERAL DEPOSIT INSURANCE... for identification of individuals making requests. (a) Individuals may request access to records...
12 CFR 310.4 - Times, places, and requirements for identification of individuals making requests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... individual's identity, or an unsworn declaration subscribed to as true under the penalty of perjury under the... identification of individuals making requests. 310.4 Section 310.4 Banks and Banking FEDERAL DEPOSIT INSURANCE... for identification of individuals making requests. (a) Individuals may request access to records...
12 CFR 310.4 - Times, places, and requirements for identification of individuals making requests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... individual's identity, or an unsworn declaration subscribed to as true under the penalty of perjury under the... identification of individuals making requests. 310.4 Section 310.4 Banks and Banking FEDERAL DEPOSIT INSURANCE... for identification of individuals making requests. (a) Individuals may request access to records...
17 CFR 145.7 - Requests for Commission records and copies thereof.
Code of Federal Regulations, 2013 CFR
2013-04-01
... (including electronic formats) of the response. The Commission will accommodate requesters as to form or... or format of the response, the Commission will respond in the form or format in which the document is... requests/oral requests. (1) The Commission cannot assure that a timely or satisfactory response will be...
17 CFR 145.7 - Requests for Commission records and copies thereof.
Code of Federal Regulations, 2012 CFR
2012-04-01
... (including electronic formats) of the response. The Commission will accommodate requesters as to form or... or format of the response, the Commission will respond in the form or format in which the document is... requests/oral requests. (1) The Commission cannot assure that a timely or satisfactory response will be...
17 CFR 145.7 - Requests for Commission records and copies thereof.
Code of Federal Regulations, 2011 CFR
2011-04-01
... (including electronic formats) of the response. The Commission will accommodate requesters as to form or... or format of the response, the Commission will respond in the form or format in which the document is... requests/oral requests. (1) The Commission cannot assure that a timely or satisfactory response will be...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-29
... Notice of Failure to Comply Form AGENCY: United States Patent and Trademark Office, Commerce. ACTION... any deficiencies in the request via a Notice of Failure to Comply with Inter Partes Reexamination Request Filing Requirements (Notice of Failure to Comply) while providing sufficient time for requester to...
49 CFR 701.7 - Timing of responses to requests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... needed to process a request or the number of pages involved. (2) In general, when requests are received... taken out of order and given expedited treatment whenever it is determined that they involve a...
49 CFR 701.7 - Timing of responses to requests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... needed to process a request or the number of pages involved. (2) In general, when requests are received... taken out of order and given expedited treatment whenever it is determined that they involve a...
49 CFR 701.7 - Timing of responses to requests.
Code of Federal Regulations, 2013 CFR
2013-10-01
... needed to process a request or the number of pages involved. (2) In general, when requests are received... taken out of order and given expedited treatment whenever it is determined that they involve a...
32 CFR 701.46 - Aggregating requests.
Code of Federal Regulations, 2011 CFR
2011-07-01
... that are for a commercial use, a DON activity may not charge for the first 2 hours of search time or.... When an activity reasonably believes that a requester or, on rare occasions, a group of requesters...
32 CFR 701.46 - Aggregating requests.
Code of Federal Regulations, 2014 CFR
2014-07-01
... that are for a commercial use, a DON activity may not charge for the first 2 hours of search time or.... When an activity reasonably believes that a requester or, on rare occasions, a group of requesters...
32 CFR 701.46 - Aggregating requests.
Code of Federal Regulations, 2010 CFR
2010-07-01
... that are for a commercial use, a DON activity may not charge for the first 2 hours of search time or.... When an activity reasonably believes that a requester or, on rare occasions, a group of requesters...
32 CFR 701.46 - Aggregating requests.
Code of Federal Regulations, 2013 CFR
2013-07-01
... that are for a commercial use, a DON activity may not charge for the first 2 hours of search time or.... When an activity reasonably believes that a requester or, on rare occasions, a group of requesters...
NASA Technical Reports Server (NTRS)
Colwell, R. N. (Principal Investigator)
1983-01-01
The three types of LANDSAT 4 film products generally accessible to the user community were analyzed and attempts were made to acquire a data set consisting of a variety of TM and MSS image products for the Sacramento and San Francisco Bay Area test sites. On request, the EDC developed an interim TM analytical film by using a leaser beam recorder to produce black and white masters from which natural and false color composites were created.
18 CFR 1301.5 - Timing of responses to requests.
Code of Federal Regulations, 2011 CFR
2011-04-01
... the estimated processing time, including a consideration of the number of pages involved. If TVA... processing. (1) Requests and appeals will be taken out of order and given expedited treatment whenever TVA...
42 CFR 478.20 - Time limits for requesting reconsideration.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 4 2011-10-01 2011-10-01 false Time limits for requesting reconsideration. 478.20... SERVICES (CONTINUED) QUALITY IMPROVEMENT ORGANIZATIONS RECONSIDERATIONS AND APPEALS Utilization and Quality Control Quality Improvement Organization (QIO) Reconsiderations and Appeals § 478.20 Time limits for...
76 FR 70165 - Ballistic-Resistant Body Armor Standard Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-10
...-on-one discussion with personnel leading development of the revised standard. Time slots for individual breakout sessions may be requested from the registration page indicated below. Additional time... the general session. Individual time slots will be available on the registration page. We request that...
76 FR 70165 - Proposed Collection, Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-10
... vacancies, labor hires, and labor separations. As the monthly JOLTS time series grow longer, their value in... ensure that requested data can be provided in the desired format, reporting burden (time and financial... businesses and organizations. Total Total Average time Estimated Affected public respondents Frequency...
6 CFR 5.5 - Timing of responses to requests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... the number of pages involved. If a component does so, it shall advise requesters in its slower track(s...) Requests and appeals will be taken out of order and given expedited treatment whenever it is determined...
32 CFR 724.812 - Responsibilities of the Reading Room.
Code of Federal Regulations, 2014 CFR
2014-07-01
... timely responses to such requests, certain factors such as the length of a request, the volume of other pending requests, and the impact of other responsibilities of the staff assigned to such duties may cause...
32 CFR 724.812 - Responsibilities of the Reading Room.
Code of Federal Regulations, 2012 CFR
2012-07-01
... timely responses to such requests, certain factors such as the length of a request, the volume of other pending requests, and the impact of other responsibilities of the staff assigned to such duties may cause...
AN/SLQ-32 EW System Model: and Expandable, Object-Oriented, Process- Based Simulation
1992-09-01
CONST threshold = 0.1; timetol = 0.01; orientol = 5.8; VAR rec, recLast :BufferBeamRecType; time,power : REAL; powerl,orientation : REAL; BEGIN NEW...PulseGroup); rec:-ASK BufferBeam Removed; time: =rec. time; orientation: =rec. orientation; OUTPUT ( "ORIENREFI, orientation); recLast :=ASK BufferBeam Last...TO Add(rec); IF (rec= recLast ) EXIT; END IF; rec :=ASK BufferBeam Remove o; ELSE ASK BufferBeam TO Add(rec); IF (rec = recLast ) EXIT; END IF; rec
CometQuest: A Rosetta Adventure
NASA Technical Reports Server (NTRS)
Leon, Nancy J.; Fisher, Diane K.; Novati, Alexander; Chmielewski, Artur B.; Fitzpatrick, Austin J.; Angrum, Andrea
2012-01-01
This software is a higher-performance implementation of tiled WMS, with integral support for KML and time-varying data. This software is compliant with the Open Geospatial WMS standard, and supports KML natively as a WMS return type, including support for the time attribute. Regionated KML wrappers are generated that match the existing tiled WMS dataset. Ping and JPG formats are supported, and the software is implemented as an Apache 2.0 module that supports a threading execution model that is capable of supporting very high request rates. The module intercepts and responds to WMS requests that match certain patterns and returns the existing tiles. If a KML format that matches an existing pyramid and tile dataset is requested, regionated KML is generated and returned to the requesting application. In addition, KML requests that do not match the existing tile datasets generate a KML response that includes the corresponding JPG WMS request, effectively adding KML support to a backing WMS server.
NASA Technical Reports Server (NTRS)
Plesea, Lucian
2012-01-01
This software is a higher-performance implementation of tiled WMS, with integral support for KML and time-varying data. This software is compliant with the Open Geospatial WMS standard, and supports KML natively as a WMS return type, including support for the time attribute. Regionated KML wrappers are generated that match the existing tiled WMS dataset. Ping and JPG formats are supported, and the software is implemented as an Apache 2.0 module that supports a threading execution model that is capable of supporting very high request rates. The module intercepts and responds to WMS requests that match certain patterns and returns the existing tiles. If a KML format that matches an existing pyramid and tile dataset is requested, regionated KML is generated and returned to the requesting application. In addition, KML requests that do not match the existing tile datasets generate a KML response that includes the corresponding JPG WMS request, effectively adding KML support to a backing WMS server.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 15 2010-01-01 2010-01-01 false Requirement for RBIC to file financial statements at... financial statements at the time of request for a draw. (a) If you submit a request for a draw against your... (Short Form), you must: (1) Give the Secretary a financial statement on Form 468 (Short Form), and (2...
Code of Federal Regulations, 2014 CFR
2014-01-01
... need to search for and collect the requested records from field facilities or other establishments that are separate from the Office of the Secretary. (2) The need to search for, collect and appropriately... a group of requesters acting in concert, if the Secretary or delegate reasonably believes that the...
Code of Federal Regulations, 2010 CFR
2010-01-01
... need to search for and collect the requested records from field facilities or other establishments that are separate from the Office of the Secretary. (2) The need to search for, collect and appropriately... a group of requesters acting in concert, if the Secretary or delegate reasonably believes that the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-31
... of data elements specific to FOIA and Privacy Act record requests submitted to FIS. Current FOIA and... consistent with the published regulations at 5 CFR 294 and 297, respectively. Often the requests are missing data elements which require contact with the requester via mail, thereby adding time to the access...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-16
..., Genealogy Index Search Request and Genealogy Records Request. The Department of Homeland Security, U.S... the Forms/Collections: Genealogy Index Search Request and Genealogy Records Request. (3) Agency form.... USCIS will use these forms will to facilitate an accurate and timely response to genealogy index search...
43 CFR 3216.15 - When must I file my transfer request?
Code of Federal Regulations, 2014 CFR
2014-10-01
... complete the transfer. (b) There is no specific time deadline for filing estate transfers, corporate... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false When must I file my transfer request? 3216... Transfers § 3216.15 When must I file my transfer request? (a) File a request to transfer record title or...
43 CFR 3216.15 - When must I file my transfer request?
Code of Federal Regulations, 2012 CFR
2012-10-01
... complete the transfer. (b) There is no specific time deadline for filing estate transfers, corporate... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false When must I file my transfer request? 3216... Transfers § 3216.15 When must I file my transfer request? (a) File a request to transfer record title or...
43 CFR 3216.15 - When must I file my transfer request?
Code of Federal Regulations, 2011 CFR
2011-10-01
... complete the transfer. (b) There is no specific time deadline for filing estate transfers, corporate... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false When must I file my transfer request? 3216... Transfers § 3216.15 When must I file my transfer request? (a) File a request to transfer record title or...
43 CFR 3216.15 - When must I file my transfer request?
Code of Federal Regulations, 2013 CFR
2013-10-01
... complete the transfer. (b) There is no specific time deadline for filing estate transfers, corporate... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false When must I file my transfer request? 3216... Transfers § 3216.15 When must I file my transfer request? (a) File a request to transfer record title or...
29 CFR 4901.33 - Payment of fees.
Code of Federal Regulations, 2010 CFR
2010-07-01
...: (i) Where the requester has a history of prompt payment of fees under this part, the PBGC will notify... requester has no history of payment for requests made pursuant to FOIA and this part, the PBGC may require... requester has previously failed to pay a fee charged in a timely fashion (i.e., within 30 days of the date...
Gender and Race in the Timing of Requests for Ethics Consultations: A Single-Center Study.
Spielman, Bethany; Gorka, Christine; Miller, Keith; Pointer, Carolyn A; Hinze, Barbara
2016-01-01
Clinical ethics consultants are expected to "reduce disparities, discrimination, and inequities when providing consultations," but few studies about inequities in ethics consultation exist.1 The objectives of this study were (1) to determine if there were racial or gender differences in the timing of requests for ethics consultations related to limiting treatment, and (2) if such differences were found, to identify factors associated with that difference and the role, if any, of ethics consultants in mitigating them. The study was a mixed methods retrospective study of consultation summaries and hospital and ethics center data on 56 age-and gender-matched Caucasian and African American Medicare patients who received ethics consultations related to issues around limiting medical treatment in the period 2011 to 2014. The average age of patients was 70.9. Consultation requests for females were made significantly earlier in their stays in the hospital (6.57 days) than were consultation requests made for males (16.07 days). For African American patients, the differences in admission-to-request intervals for female patients (5.93 days) and male patients (18.64 days) were greater than for Caucasian male and female patients. Differences in the timing of a consultation were not significantly correlated with the presence of an advance directive, the specialty of the attending physician, or the reasons for the consult request. Ethics consultants may have mitigated problems that developed during the lag in request times for African American males by spending more time, on average, on those consultations (316 minutes), especially more time, on average, than on consultations with Caucasian females (195 minutes). Most consultations (40 of 56) did result in movement toward limiting treatment, but no statistically significant differences were found among the groups studied in the movement toward limiting treatment. The average number of days from consult to discharge or death were strongly correlated with the intervals between admission to the hospital and request for an ethics consultation. Our findings suggest race and gender disparities in the timing of ethics consultations that consultants may have partially mitigated. Copyright 2016 The Journal of Clinical Ethics. All rights reserved.
Autogenerator of beams of charged particles
Adler, Richard J.; Mazarakis, Michael G.; Miller, Robert B.; Shope, Steven L.; Smith, David L.
1986-01-01
An autogenerating apparatus provides secondary intense relativistic current beam pulses in response to an injected beam pulse. One or more electromagnetic energy storage devices are provided in conjunction with gaps along a beam propagation path for the injected beam pulse. For injected beam pulses which are no longer than double the transit time of electromagnetic waves within the storage devices (which may be resonant cavities), distinct secondary beam pulses are generated by each of the energy storage devices. The beam propagation path, together with the one or more gaps provided therein, operates as a pulse forming transmission line cavity, in which the separate cavities associated with the gaps provide delays for electromagnetic waves generated at the gaps. After doubly traversing the cavity, the electromagnetic waves cause the gap to generate the secondary beam pulses, which are thus delayed by a time interval equal to the double transit time for the induced wave within the cavity.
Autogenerator of beams of charged particles
Adler, R.J.; Mazarakis, M.G.; Miller, R.M.; Shope, S.L.; Smith, D.L.
1983-10-31
An autogenerating apparatus provides secondary intense relativistic current beam pulses in response to an injected beam pulse. One or more electromagnetic energy storage devices are provided in conjunction with gaps along a beam propagation path for the injected beam pulse. For injected beam pulses which are no longer than double the transit time of electromagnetic waves within the storage devices (which may be resonant cavities), distinct secondary beam pulses are generated by each of the energy storage devices. The beam propagation path, together with the one or more gaps provided therein, operates as a pulse forming transmission line cavity, in which the separate cavities associated with the gaps provide delays for electromagnetic waves generated at the gaps. After doubly traversing the cavity, the electromagnetic waves cause the gap to generate the secondary beam pulses, which are thus delayed by a time interval equal to the double transit time for the induced wave within the cavity.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-31
... DEPARTMENT OF TRANSPORTATION Maritime Administration [Docket No. MARAD 2011 0136] Requested Administrative Waiver of the Coastwise Trade Laws: Vessel ABOUT TIME; Invitation for Public Comments AGENCY... ABOUT TIME is: INTENDED COMMERCIAL USE OF VESSEL: ``Uninspected passenger vessel.'' GEOGRAPHIC REGION...
75 FR 37838 - Proposed Collection, Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-30
... data are collected on an ongoing, monthly basis, so time series data will eventually become available... ensure that requested data can be provided in the desired format, reporting burden (time and financial... comments concerning the proposed revision to the ``American Time Use Survey (ATUS).'' A copy of the...
Foo, Cheryl P Z; Ahghari, Mahvareh; MacDonald, Russell D
2010-01-01
Traumatic injury is a leading cause of morbidity and mortality, but these can be minimized by timely transport to definite care. Helicopter emergency medical services (HEMS) provide timely transport and can influence survival. However, accident analyses indicate that landing at an unsecured landing zone (LZ), particularly at night, increases the risk of aviation accidents. To ensure safety, some HEMS operations land only at designated, secured LZs. This study utilized geographic information systems (GISs) to compare locations of scene call requests and secure LZs. The goal was to determine the optimal placement of new helipads as a strategy to improve access while mitigating the risk of aviation accidents. Call request data from a large air medical transport service were used to determine the geographic locations of all requests for scene responses in 2006. Request locations were compared with the locations of existing helipads, and straight-line distances between scene and helipad were determined using the GIS application. The application was then used to determine potential locations for new helipads. During the study period, 748 requests for scene calls and 269 helipads were available. There were 476 (52.4%) requests at least 10 kilometers from a helipad and 356 (36.6%) requests at least 15 kilometers from a helipad. One particular region, Southwestern Ontario, was identified as having the highest number of requests >15 kilometers from the closest helipad. GISs can be used to determine potential locations for new helipad construction using historical call request data. This evidence-based approach can improve HEMS access while mitigating operational risk.
Progress on MEVVA source VARIS at GSI
NASA Astrophysics Data System (ADS)
Adonin, A.; Hollinger, R.
2018-05-01
For the last few years, the development of the VARIS (vacuum arc ion source) was concentrated on several aspects. One of them was the production of high current ion beams of heavy metals such as Au, Pb, and Bi. The requested ion charge state for these ion species is 4+. This is quite challenging to produce in vacuum arc driven sources for reasonable beam pulse length (>120 µs) due to the physical properties of these elements. However, the situation can be dramatically improved by using the composite materials or alloys with enhanced physical properties of the cathodes. Another aspect is an increase of the beam brilliance for intense U4+ beams by the optimization of the geometry of the extraction system. A new 7-hole triode extraction system allows an increase of the extraction voltage from 30 kV to 40 kV and also reduces the outer aperture of the extracted ion beam. Thus, a record beam brilliance for the U4+ beam in front of the RFQ (Radio-Frequency Quadrupole) has been achieved, exceeding the RFQ space charge limit for an ion current of 15 mA. Several new projectiles in the middle-heavy region have been successfully developed from VARIS to fulfill the requirements of the future FAIR (Facility for Antiproton and Ion Research) programs. An influence of an auxiliary gas on the production performance of certain ion charge states as well as on operation stability has been investigated. The optimization of the ion source parameters for a maximum production efficiency and highest particle current in front of the RFQ has been performed. The next important aspect of the development will be the increase of the operation repetition rate of VARIS for all elements especially for uranium to 2.7 Hz in order to provide the maximum availability of high current ion beams for future FAIR experiments.
42 CFR 405.952 - Withdrawal or dismissal of a request for a redetermination.
Code of Federal Regulations, 2010 CFR
2010-10-01
... to file the redetermination request within the proper filing time frame in accordance with § 405.942... dismissal. (e) Effect of dismissal. The dismissal of a request for redetermination is binding unless it is...
44 CFR 5.51 - Submission of requests for described records.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of Information Request” prominently marked on both the face of the request letter and the envelope. The 10-day time limit for agency determinations set forth in § 5.52 shall not start until a request is...
78 FR 32474 - Request for Comments: LSC Appropriations Request for FY 2015
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-30
... and is seeking public comment and testimony on what the amount of its request should be. DATES... p.m., Eastern Daylight Time, on Thursday June 6, 2013. LSC invites public comment on what its FY...
Ion Beam Measurements of a Dense Plasma Focus Device Using CR 39 Nuclear Track Detectors
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ngoi, S. K.; Yap, S. L.; Wong, C. S.
The project is carried out using a small Mather type plasma focus device powered by a 15 kV, 30 {mu}F capacitor. The filling gas used is argon. The ion beam generated is investigated by both time resolved and time integrated methods. Investigation on the dynamic of the current sheath is also carried out in order to obtain an optimum condition for ion beam production. The angular distribution of the ion emission is measured at positions of 0 deg. (end-on), 45 deg. and 90 deg. (side-on) by using CR-39 nuclear track detectors. The divergence of the ion beam is also determinedmore » using these detectors. A biased ion collector is used for time resolved measurement of the ion beam. Time of flight technique is employed for the determination of the ion beam energy. Average ion beam energy obtained is about 180 keV. The ion beam produced can be used for applications such as material surface modification and ion implantation.« less
29 CFR 553.25 - Conditions for use of compensatory time (“reasonable period”, “unduly disrupt”).
Code of Federal Regulations, 2010 CFR
2010-07-01
... OF STATE AND LOCAL GOVERNMENTS General Section 7(o)-Compensatory Time and Compensatory Time Off § 553... good faith expect to be able to grant within a reasonable period of his or her making a request for use of such time. (c) Reasonable period. (1) Whether a request to use compensatory time has been granted...
An Efficient Scheduling Scheme on Charging Stations for Smart Transportation
NASA Astrophysics Data System (ADS)
Kim, Hye-Jin; Lee, Junghoon; Park, Gyung-Leen; Kang, Min-Jae; Kang, Mikyung
This paper proposes a reservation-based scheduling scheme for the charging station to decide the service order of multiple requests, aiming at improving the satisfiability of electric vehicles. The proposed scheme makes it possible for a customer to reduce the charge cost and waiting time, while a station can extend the number of clients it can serve. A linear rank function is defined based on estimated arrival time, waiting time bound, and the amount of needed power, reducing the scheduling complexity. Receiving the requests from the clients, the power station decides the charge order by the rank function and then replies to the requesters with the waiting time and cost it can guarantee. Each requester can decide whether to charge at that station or try another station. This scheduler can evolve to integrate a new pricing policy and services, enriching the electric vehicle transport system.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-19
... Pertaining to Requests for Sampling in Antidumping Duty Administrative Reviews AGENCY: International Trade... sampling, and comments on sampling in antidumping (AD) administrative reviews. The modifications to the time limits, if adopted, will more clearly prescribe the time for filing requests for sampling in AD...
28 CFR 32.42 - Time for filing request for determination.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Time for filing request for determination. 32.42 Section 32.42 Judicial Administration DEPARTMENT OF JUSTICE PUBLIC SAFETY OFFICERS' DEATH, DISABILITY, AND EDUCATIONAL ASSISTANCE BENEFIT CLAIMS Hearing Officer Determinations § 32.42 Time for filing...
76 FR 69764 - Stab-Resistant Body Armor Standard Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-09
... standard. Time slots for individual breakout sessions may be requested from the registration page indicated below. Additional time slots will be made available if needed to accommodate attendee requests. Workshop... will be allowed to register for the general session. Individual time slots will be available on the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... DEPARTMENT OF TRANSPORTATION Maritime Administration [Docket No. MARAD-2013 0015] Requested Administrative Waiver of the Coastwise Trade Laws: Vessel LAST TIME AROUND; Invitation for Public Comments AGENCY... TIME AROUND is: Intended Commercial Use Of Vessel: ``Chartering for day or week'' Geographic Region...
1 CFR 455.4 - Times, places, and requirements for identification of individuals making requests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 1 General Provisions 1 2010-01-01 2010-01-01 false Times, places, and requirements for identification of individuals making requests. 455.4 Section 455.4 General Provisions MISCELLANEOUS AGENCIES NATIONAL CAPITAL PLANNING COMMISSION (PRIVACY ACT REGULATIONS) § 455.4 Times, places, and requirements for...
28 CFR 32.42 - Time for filing request for determination.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 1 2011-07-01 2011-07-01 false Time for filing request for determination. 32.42 Section 32.42 Judicial Administration DEPARTMENT OF JUSTICE PUBLIC SAFETY OFFICERS' DEATH, DISABILITY, AND EDUCATIONAL ASSISTANCE BENEFIT CLAIMS Hearing Officer Determinations § 32.42 Time for filing...
Balcom, Jessica R; Veach, Patricia McCarthy; Bemmels, Heather; Redlinger-Grosse, Krista; LeRoy, Bonnie S
2013-06-01
A limited amount of research indicates patient requests play a major role in genetic counselors' self-disclosure decisions and that disclosure and non-disclosure responses to patient requests may differentially affect genetic counseling processes. Studies further suggest patient requests may be more common in prenatal settings, particularly when counselors are pregnant. Empirical evidence is limited however, concerning the nature of patient requests. This study explored genetic counselors' experiences of prenatal patients' requests for self-disclosure. Four major research questions were: (1) What types of questions do prenatal patients ask that invite self-disclosure?; (2) Do pregnant genetic counselors have unique experiences with prenatal patient disclosure requests?; (3) How do genetic counselors typically respond to disclosure requests?; and (4) What strategies are effective and ineffective in responding to disclosure requests? One hundred seventy-six genetic counselors completed an online survey and 40 also participated in telephone interviews. Inductive analysis of 21 interviews revealed patient questions vary, although questions about counselor demographics are most common, and patients are more likely to ask pregnant counselors questions about their personal pregnancy decisions. Participants reported greater discomfort with self-disclosure requests during pregnancy, yet also disclosing more frequently during pregnancy. Counselor responses included personal self-disclosure, professional self-disclosure, redirection, and declining to disclose. Factors perceived as influencing disclosure included: topic, patient motivations, timing of request, quality of counseling relationship, patient characteristics, and ethical/legal responsibilities. Disclosure practices changed over time for most counselors. Additional findings, practice implications, and research recommendations are discussed.
Sandgren, Olof; Andersson, Richard; van de Weijer, Joost; Hansson, Kristina; Sahlén, Birgitta
2012-01-01
This study investigates gaze behaviour in child dialogues. In earlier studies the authors have investigated the use of requests for clarification and responses in order to study the co-creation of understanding in a referential communication task. By adding eye tracking, this line of research is now expanded to include non-verbal contributions in conversation. To investigate the timing of gazes in face-to-face interaction and to relate the gaze behaviour to the use of requests for clarification. Eight conversational pairs of typically developing 10-15 year olds participated. The pairs (director and executor) performed a referential communication task requiring the description of faces. During the dialogues both participants wore head-mounted eye trackers. All gazes were recorded and categorized according to the area fixated (Task, Face, Off). The verbal context for all instances of gaze at the partner's face was identified and categorized using time-course analysis. The results showed that the executor spends almost 90% of the time fixating the gaze on the task, 10% on the director's face and less than 0.5% elsewhere. Turn shift, primarily requests for clarification, and back channelling significantly predicted the executors' gaze to the face of the task director. The distribution of types of requests showed that requests for previously unmentioned information were significantly more likely to be associated with gaze at the director. The study shows that the executors' gaze at the director accompanies important dynamic shifts in the dialogue. The association with requests for clarification indicates that gaze at the director can be used to monitor the response with two modalities. Furthermore, the significantly higher association with requests for previously unmentioned information indicates that gaze may be used to emphasize the verbal content. The results will be used as a reference for studies of gaze behaviour in clinical populations with hearing and language impairments. © 2012 Royal College of Speech and Language Therapists.
Morgan, Matthew B; Young, Elizabeth; Harada, Scott; Winkler, Nicole; Riegert, Joanna; Jones, Tony; Hu, Nan; Stein, Matthew
2017-12-01
In screening mammography, accessing prior examination images is crucial for accurate diagnosis and avoiding false-positives. When women visit multiple institutions for their screens, these "outside" examinations must be retrieved for comparison. Traditionally, prior images are obtained by faxing requests to other institutions and waiting for standard mail (film or CD-ROM), which can greatly delay report turnaround times. Recently, advancements in cloud-based image transfer technology have opened up more efficient options for examination transfer between institutions. The objective of this study was to evaluate the effect of cloud-based image transfer on mammography department workflow, time required to obtain prior images, and report turnaround times. Sixty screening examinations requiring prior images were placed into two groups (30 each). The control group used the standard institutional protocol for requesting prior images: faxing requests and waiting for mailed examinations. The experimental group used a cloud-based transfer for both requesting and receiving examinations. The mean number of days between examination request and examination receipt was measured for both groups and compared. The mean number of days from examination request to receipt was 6.08 days (SD 3.50) in the control group compared with 3.16 days (SD 3.95) in the experimental group. Using a cloud-based image transfer to obtain prior mammograms resulted in an average reduction of 2.92 days (P = .0361; 95% confidence interval 0.20-5.65) between examination request and receipt. This improvement in system efficiency is relevant for interpreting radiologists working to improve reporting times and for patients anxious to receive their mammography results. Copyright © 2017 American College of Radiology. Published by Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
The past year has been an exciting and productive one for particle physics research at Abilene Christian University. The thrust of our experimental investigations is the study of the nucleon and its excited states. Laboratories where these investigations are presently being conducted are the AGS at Brookhaven, Fermilab and LAMPF. Some analysis of the data for experiments at the Petersburg Nuclear Physics Institute (Gatchina, Russia) is still in progress. Scheduling of activities at different laboratories inevitably leads to occasional conflicts. This likelihood is increased by the present budget uncertainties at the laboratories that make long-term scheduling difficult. For the mostmore » part, the investigators have been able to avoid such conflicts. Only one experiment received beam time in 1994 (E890 at the AGS). The situation for 1995-1996 also appears manageable at this point. E890 and another AGS experiment (E909) will run through May, 1995. El 178 at LAMPF is presently scheduled for August/September 1995. E866 at Fermilab is scheduled to start in Spring/Summer 1996. Undergraduate student involvement has been a key element in this research contract since its inception. Summer students participated at all of the above laboratories in 1994 and the same is planned in 1995. A transition to greater involvement by graduate students will provide cohesiveness to ACU involvement at a given laboratory and full-time on-site involvement in the longer running experiments at FNAL and BNL. Funds to support a full-time graduate student are requested this year. Finally, collaboration by Russian, Croatian and Bosnian scientists has proven to be mutually beneficial to these experimental programs and to the overall programs at the institutions involved. Past support has been augmented by other grants from government agencies and from the Research Council at Abilene Christian University. Additional funds are requested in this renewal to enable more programmatic support for these efforts, so that long-range plans can be made to carry out the experiments and to perform the analysis.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-20
... request a predecisional enforcement conference or request alternative dispute resolution (ADR) with the... the absence of any request for hearing or ADR, or written approval of an extension of time in which to... hearing or ADR is requested, the effective date of this Order shall be determined in accordance with the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... requests and identification of records requested. (a) The General Counsel is the designated Privacy Act.... The words Privacy Act Request should be placed in capital letters on the face of the envelope in order... penalties for the making of false statements. (f) The parent or guardian of a minor or a person judicially...
Code of Federal Regulations, 2010 CFR
2010-10-01
... requests and identification of records requested. (a) The General Counsel is the designated Privacy Act.... The words Privacy Act Request should be placed in capital letters on the face of the envelope in order... penalties for the making of false statements. (f) The parent or guardian of a minor or a person judicially...
45 CFR 613.3 - Responding to requests for access to records.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 3 2011-10-01 2011-10-01 false Responding to requests for access to records. 613.3 Section 613.3 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PRIVACY ACT REGULATIONS § 613.3 Responding to requests for access to records. (a) Timing of responses to requests. The Foundation will make...
45 CFR 613.3 - Responding to requests for access to records.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 3 2010-10-01 2010-10-01 false Responding to requests for access to records. 613.3 Section 613.3 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PRIVACY ACT REGULATIONS § 613.3 Responding to requests for access to records. (a) Timing of responses to requests. The Foundation will make...
26 CFR 1.6015-5 - Time and manner for requesting relief.
Code of Federal Regulations, 2010 CFR
2010-04-01
... relief. (a) Requesting relief. To elect the application of § 1.6015-2 or 1.6015-3, or to request... general. To elect the application of § 1.6015-2 or 1.6015-3, or to request equitable relief under § 1.6015... spouse after July 22, 1998, with respect to the joint tax liability. (2) Definitions—(i) Collection...
29 CFR 70.25 - Time limits and order in which requests must be processed.
Code of Federal Regulations, 2012 CFR
2012-07-01
... pages involved. If a component does so, it will advise requesters in its slower track(s) of the limits... unrelated matters will not be aggregated. (d) Expedited processing. (1) Requests and appeals will be taken...
29 CFR 70.25 - Time limits and order in which requests must be processed.
Code of Federal Regulations, 2011 CFR
2011-07-01
... pages involved. If a component does so, it will advise requesters in its slower track(s) of the limits... unrelated matters will not be aggregated. (d) Expedited processing. (1) Requests and appeals will be taken...
29 CFR 70.25 - Time limits and order in which requests must be processed.
Code of Federal Regulations, 2013 CFR
2013-07-01
... pages involved. If a component does so, it will advise requesters in its slower track(s) of the limits... unrelated matters will not be aggregated. (d) Expedited processing. (1) Requests and appeals will be taken...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-28
... requests are missing data elements that require contact with the requester by mail, thereby adding time to... standardize collection of data elements specific to FOIA and Privacy Act record requests submitted to FIS...
36 CFR 1250.26 - How quickly will NARA respond to my FOIA request?
Code of Federal Regulations, 2011 CFR
2011-07-01
... requesters of any complexity in processing their request, which may lengthen the time required to reach a final decision on the release of the records. (b) In most cases, NARA will make a decision on the...
Coherent hybrid electromagnetic field imaging
Cooke, Bradly J [Jemez Springs, NM; Guenther, David C [Los Alamos, NM
2008-08-26
An apparatus and corresponding method for coherent hybrid electromagnetic field imaging of a target, where an energy source is used to generate a propagating electromagnetic beam, an electromagnetic beam splitting means to split the beam into two or more coherently matched beams of about equal amplitude, and where the spatial and temporal self-coherence between each two or more coherently matched beams is preserved. Two or more differential modulation means are employed to modulate each two or more coherently matched beams with a time-varying polarization, frequency, phase, and amplitude signal. An electromagnetic beam combining means is used to coherently combine said two or more coherently matched beams into a coherent electromagnetic beam. One or more electromagnetic beam controlling means are used for collimating, guiding, or focusing the coherent electromagnetic beam. One or more apertures are used for transmitting and receiving the coherent electromagnetic beam to and from the target. A receiver is used that is capable of square-law detection of the coherent electromagnetic beam. A waveform generator is used that is capable of generation and control of time-varying polarization, frequency, phase, or amplitude modulation waveforms and sequences. A means of synchronizing time varying waveform is used between the energy source and the receiver. Finally, a means of displaying the images created by the interaction of the coherent electromagnetic beam with target is employed.
Studies of Ion Beam Charge Neutralization by Ferroelectric Plasma Sources
NASA Astrophysics Data System (ADS)
Stepanov, A.; Gilson, E. P.; Grisham, L.; Davidson, R. C.
2013-10-01
Space-charge forces limit the possible transverse compression of high perveance ion beams that are used in ion-beam-driven high energy density physics applications; the minimum radius to which a beam can be focused is an increasing function of perveance. The limit can be overcome if a plasma is introduced in the beam path between the focusing element and the target in order to neutralize the space charge of the beam. This concept has been implemented on the Neutralized Drift Compression eXperiment (NDCX) at LBNL using Ferroelectric Plasma Sources (FEPS). In our experiment at PPPL, we propagate a perveance-dominated ion beam through a FEPS to study the effect of the neutralizing plasma on the beam envelope and its evolution in time. A 30-60 keV space-charge-dominated Argon beam is focused with an Einzel lens into a FEPS located at the beam waist. The beam is intercepted downstream from the FEPS by a movable Faraday cup that provides time-resolved 2D current density profiles of the beam spot on target. We report results on: (a) dependence of charge neutralization on FEPS plasma density; (b) effects on beam emittance, and (c) time evolution of the beam envelope after the FEPS pulse. Research supported by the U.S. Department of Energy.
NASA Astrophysics Data System (ADS)
Takada, M.; Kamada, S.; Suda, M.; Fujii, R.; Nakamura, M.; Hoshi, M.; Sato, H.; Endo, S.; Hamano, T.; Arai, S.; Higashimata, A.
2012-10-01
We developed a real-time and non-destructive method of beam profile measurement on a target under large beam current irradiation, and without any complex radiation detectors or electrical circuits. We measured the beam profiles on a target by observing the target temperature using an infrared-radiation thermometer camera. The target temperatures were increased and decreased quickly by starting and stopping the beam irradiation within 1 s in response speed. Our method could trace beam movements rapidly. The beam size and position were calibrated by measuring O-ring heat on the target. Our method has the potential to measure beam profiles at beam current over 1 mA for proton and deuteron with the energy around 3 MeV and allows accelerator operators to adjust the beam location during beam irradiation experiments without decreasing the beam current.
Venugopal, Vidya; Lehmann, Christoph U; Diener-West, Marie; Agwu, Allison L
2014-02-01
The Johns Hopkins Children's Medical and Surgery Center developed a Web-based Antimicrobial Stewardship Program (ASP) in 2005. The present study aimed to assess longitudinal antimicrobial request and approval patterns for this ASP. We analyzed a total of 16,229 antimicrobial requests for 3,542 patients between June 1, 2005, and June 30, 2009. Antimicrobial approval was the outcome of interest. We assessed gaming by studying trends in automatically approved requests. Nonparametric tests for trend were performed to detect changes in approval patterns. Multiple logistic regression was used to identify factors associated with approval. The vast majority (91.3%) of antimicrobial requests were approved, with an increase of 6.1% over time (P < .01). Renewal requests were more likely than primary requests (adjusted odds ratio [aOR], 1.72; 95% confidence interval [CI], 1.45-2.04) to be approved. Antiviral requests had higher odds of approval than antibiotic requests (aOR, 1.27; 95% CI, 1.04-1.56). Compared with requests by medical services, requests by surgical services had lower odds of approval (aOR, 0.70; 95% CI, 0.59-0.83), whereas pediatric intensive care requests had higher odds of approval (aOR, 1.18; 95% CI, 1.00-1.40). The number of auto-approved requests remained consistent. The Web-based ASP allows management of a large number of antimicrobial requests, without apparent gaming. Observed differences in approval patterns based on patient, requestor, and antimicrobial factors may inform the development of ASPs and evaluation of provider education and training. Copyright © 2014 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Mosby, Inc. All rights reserved.
ERIC Educational Resources Information Center
Hobson, Art
2011-01-01
An earlier paper introduces quantum physics by means of four experiments: Youngs double-slit interference experiment using (1) a light beam, (2) a low-intensity light beam with time-lapse photography, (3) an electron beam, and (4) a low-intensity electron beam with time-lapse photography. It's ironic that, although these experiments demonstrate…
Hale, Thomas C.; Telschow, Kenneth L.
1998-01-01
A vibration detection assembly is described which includes an emitter of light which has object and reference beams, the object beam reflected off of a vibrating object of interest; and a photorefractive substance having a given response time and which passes the reflected object beam and the reference beam, the reference beam and the object beam interfering within the photorefractive substance to create a space charge field which develops within the response time of the photorefractive substance.
Hale, T.C.; Telschow, K.L.
1998-10-27
A vibration detection assembly is described which includes an emitter of light which has object and reference beams, the object beam reflected off of a vibrating object of interest; and a photorefractive substance having a given response time and which passes the reflected object beam and the reference beam, the reference beam and the object beam interfering within the photorefractive substance to create a space charge field which develops within the response time of the photorefractive substance. 6 figs.
A note on the Sagnac effect for matter beams
NASA Astrophysics Data System (ADS)
Ruggiero, Matteo Luca; Tartaglia, Angelo
2015-05-01
We study the Sagnac effect for matter beams, in order to estimate the kinematic corrections to the basic formula, deriving from the position and the extent of the interferometer, and discuss the analogy with the Aharonov-Bohm effect. We show that the formula for the Sagnac time delay is the same for matter and light beams in arbitrary stationary space-times, provided that a suitable condition on the speed of the beams is fulfilled. Hence, the same results obtained for light beams apply to matter beams.
Radiation Protection in Canada
Williams, N.
1965-01-01
The main emphasis of a provincial radiation protection program is on ionizing radiation produced by machines, although assistance is given to the Federal Radiation Protection Division in its program relating to radioactive substances. The basis for the Saskatchewan program of radiation protection is the Radiological Health Act 1961. An important provision of the Act is annual registration of radiation equipment. The design of the registration form encourages a “do-it-yourself” radiation and electrical safety inspection. Installations are inspected every two years by a radiation health officer. Two hundred and twenty-one deficiencies were found during inspection of 224 items of radiation equipment, the commonest being failure to use personal film badges. Insufficient filtration of the beam, inadequate limitation of the beam, and unnecessary exposure of operators were other common faults. Physicians have a responsibility to weigh the potential advantages against the hazards when requesting radiographic or fluoroscopic procedures. PMID:14282164
Micro structure processing on plastics by accelerated hydrogen molecular ions
NASA Astrophysics Data System (ADS)
Hayashi, H.; Hayakawa, S.; Nishikawa, H.
2017-08-01
A proton has 1836 times the mass of an electron and is the lightest nucleus to be used for accelerator in material modification. We can setup accelerator with the lowest acceleration voltage. It is preferable characteristics of Proton Beam Writer (PBW) for industrial applications. On the contrary ;proton; has the lowest charge among all nuclei and the potential impact to material is lowest. The object of this research is to improve productivity of the PBW for industry application focusing on hydrogen molecular ions. These ions are generated in the same ion source by ionizing hydrogen molecule. There is no specific ion source requested and it is suitable for industrial use. We demonstrated three dimensional (3D) multilevel micro structures on polyester base FPC (Flexible Printed Circuits) using proton, H2+ and H3+. The reactivity of hydrogen molecular ions is much higher than that of proton and coincident with the level of expectation. We can apply this result to make micro devices of 3D multilevel structures on FPC.
78 FR 76378 - Agency Information Collection Activities: Proposed Request and Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-17
... collection techniques or other forms of information technology. Mail, email, or fax your comments and...-approved information collection. Time Burden--Participating Companies Average Total Number of Frequency of... SOCIAL SECURITY ADMINISTRATION Agency Information Collection Activities: Proposed Request and...
Ultrafast gating of a mid-infrared laser pulse by a sub-pC relativistic electron beam
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cesar, D. B.; Musumeci, P.; Alesini, D.
In this paper we discuss a relative time-of-arrival measurement scheme between an electron beam and a mid-infrared laser pulse based on the electron-beam controlled transmission in semiconductor materials. This technique can be used as a time-stamping diagnostic in ultrafast electron diffraction or microscopy. In particular, our characterization of Germanium demonstrates that sub-ps time-of-arrival sensitivity could be achieved in a single shot and with very low charge beams (<1 pC). Detailed measurements as a function of the beam charge and the laser wavelength offer insights on the free carrier dynamics in the semiconductor upon excitation by the electron beam.
Code of Federal Regulations, 2013 CFR
2013-01-01
... requester for the first two hours of search time and the first 100 pages of duplication in response to any FOIA request. (2) Free computer search time. For purposes of this paragraph, the term search time is based on the concept of a manual search. To apply this to a search conducted by a computer, the...
Code of Federal Regulations, 2014 CFR
2014-01-01
... requester for the first two hours of search time and the first 100 pages of duplication in response to any FOIA request. (2) Free computer search time. For purposes of this paragraph, the term search time is based on the concept of a manual search. To apply this to a search conducted by a computer, the...
Code of Federal Regulations, 2012 CFR
2012-01-01
... requester for the first two hours of search time and the first 100 pages of duplication in response to any FOIA request. (2) Free computer search time. For purposes of this paragraph, the term search time is based on the concept of a manual search. To apply this to a search conducted by a computer, the...
18 CFR 1301.14 - Times, places, and requirements for identification of individuals making requests.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Times, places, and... and Water Resources TENNESSEE VALLEY AUTHORITY PROCEDURES Privacy Act § 1301.14 Times, places, and requirements for identification of individuals making requests. (a) TVA will require proof of identity, in...
28 CFR 513.68 - Time limits for responses to Freedom of Information Act requests.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Time limits for responses to Freedom of... JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION ACCESS TO RECORDS Release of Information Freedom of Information Act Requests for Information § 513.68 Time limits for responses to Freedom of Information Act...
41 CFR 51-9.302 - Times, places and requirements for access requests.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Times, places and requirements for access requests. 51-9.302 Section 51-9.302 Public Contracts and Property Management Other... Director may require a notarized statement of identity. The Executive Director shall ensure that such times...
18 CFR 701.205 - Time limit for requester to appeal an initial adverse determination.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Time limit for requester to appeal an initial adverse determination. 701.205 Section 701.205 Conservation of Power and Water Resources WATER RESOURCES COUNCIL COUNCIL ORGANIZATION Availability of Information § 701.205 Time...
18 CFR 701.205 - Time limit for requester to appeal an initial adverse determination.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Time limit for requester to appeal an initial adverse determination. 701.205 Section 701.205 Conservation of Power and Water Resources WATER RESOURCES COUNCIL COUNCIL ORGANIZATION Availability of Information § 701.205 Time...
18 CFR 701.205 - Time limit for requester to appeal an initial adverse determination.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Time limit for requester to appeal an initial adverse determination. 701.205 Section 701.205 Conservation of Power and Water Resources WATER RESOURCES COUNCIL COUNCIL ORGANIZATION Availability of Information § 701.205 Time...
18 CFR 701.205 - Time limit for requester to appeal an initial adverse determination.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Time limit for requester to appeal an initial adverse determination. 701.205 Section 701.205 Conservation of Power and Water Resources WATER RESOURCES COUNCIL COUNCIL ORGANIZATION Availability of Information § 701.205 Time...
Memo: Request for Approval of a Time-Critical Removal Action and $2 Million
The purpose of this Action Memorandum is to request and document approval of a time-critical removal action described herein for the Mississippi Phosphates Corporation Site (Site) located at 601 Industrial Road, Pascagoula, Jackson County, Mississippi.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... Comment Request: Request for Human Embryonic Stem Cell Line To Be Approved for Use in NIH Funded Research... Embryonic Stem Cell Line to be Approved for Use in NIH Funded Research. OMB No. 0925-0601-- Expiration Date... cell lines be approved for use in NIH funded research. Applicants may submit applications at any time...
7 CFR 15f.14 - What happens after I file a request for a hearing?
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 1 2011-01-01 2011-01-01 false What happens after I file a request for a hearing? 15f... after I file a request for a hearing? Within 20 days after you have filed your request for a hearing, ALJ shall file with the Docketing Clerk a notice stating the time, place, and manner of the hearing...
NASA Technical Reports Server (NTRS)
Winglee, R. M.; Pritchett, P. L.
1988-01-01
Beam-plasma interactions associated with the cross-field and field-aligned injection of electron beams from spacecraft were investigated using a two-dimensional (three velocity component) electrostatic particle simulations. It is shown that the beam properties and plasma response can be characterized well by the ratio between the stagnation time and the plasma response time, which depends on the ratio of the ambient plasma density to the beam density, the beam width, the beam energy, and the spacecraft length. It was found that the beams injected across the field lines tend to lose their coherence after about one or two gyrations due to space-charge oscillations induced by the beam, irrespective of the spacecraft charging. These oscillations scatter the beam electrons into a hollow cylinder of a radius equal to a beam electron gyroradius and thickness of the order of two beam Debye lengths. Parallel injected beams are subjected to similar oscillations, which cause the beam to expand to fill a solid cylinder of a comparable thickness.
Electron gun jitter effects on beam bunching
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liu, M. S.; Iqbal, M., E-mail: muniqbal.chep@pu.edu.pk; Centre for High Energy Physics, University of the Punjab, Lahore 45590
For routine operation of Beijing Electron Positron Collider II (BEPCII) linac, many factors may affect the beam bunching process directly or indirectly. We present the measurements and analyses of the gun timing jitter, gun high voltage jitter, and beam energy at the exit of the standard acceleration section of the linac quantitatively. Almost 80 mV and more than 200 ps of gun high voltage and time jitters have ever been measured, respectively. It was analyzed that the gun timing jitter produced severe effects on beam energy than the gun high voltage jitter, if the timing jitter exceeded 100 ps whichmore » eventually deteriorates both the beam performance and the injection rate to the storage ring.« less
Real-time determination of laser beam quality by modal decomposition.
Schmidt, Oliver A; Schulze, Christian; Flamm, Daniel; Brüning, Robert; Kaiser, Thomas; Schröter, Siegmund; Duparré, Michael
2011-03-28
We present a real-time method to determine the beam propagation ratio M2 of laser beams. The all-optical measurement of modal amplitudes yields M2 parameters conform to the ISO standard method. The experimental technique is simple and fast, which allows to investigate laser beams under conditions inaccessible to other methods.
Preliminary Findings of the Brief Everyday Activities Measurement (BEAM) in Older Adults.
Scharaga, E A; Holtzer, R
2015-11-01
Functional losses are common in healthy and cognitively impaired older adults. However, subtle declines in instrumental activities of daily living (IADLs) are not always detected in self-reports. Performance IADL measurements are financially and time burdensome, restricting their use in varied settings. To address these limitations, we developed the Brief Everyday Activities Measure (BEAM), a short (< 5 minutes) objective IADL measure that assesses medication and finance management. The BEAM was administered to 209 cognitively non-demented community-dwellers (ages 65 - 95 years). Participants completed standardized motor, neuropsychological, psychological, and self-report functional assessments. BEAM completion time ranged from 54.16 to 259.31 seconds. Interclass correlations (ICC) for total BEAM completion time was moderate (0.65, 95% CI [.43 -.78]). Accuracy for total BEAM performance was in the low-moderate range (Kappa = 0.38, p < .001, 95% CI [.18 -.54]). As predicted, lower accuracy and longer time to complete the BEAM were both associated with worse executive functions, attention, and processing speed. Medication and finance management can be efficiently assessed within five minutes. The BEAM may be a valuable screening tool to evaluate these functional abilities.
78 FR 70539 - Proposed Information Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-26
... program helps to ensure that requested data can be provided in the desired format, reporting burden (time... of collection requirement on respondents can be properly assessed. Currently, CNCS is soliciting... for funding. Copies of the information collection request can be obtained by contacting the office...
77 FR 2094 - Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-13
... ensure that requested data can be provided in the desired format, reporting burden (time and financial... requirements on respondents can be properly assessed. Currently, the NEA is soliciting comments concerning... Regional Arts Organizations. A copy of the current information collection request can be obtained by...
78 FR 77173 - Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-20
... because they effect transactions in securities futures products. The information obtained from Rule 17a-13... time complying with the rule, given that they do not do a public securities business or do not hold... SECURITIES AND EXCHANGE COMMISSION Proposed Collection; Comment Request Upon Written Request...
32 CFR 806.6 - Prompt action on requests.
Code of Federal Regulations, 2012 CFR
2012-07-01
... quickly, with limited impact on the responding units. The request clearly identifies the records with no (or few) complicating factors involved. There are few or no responsive records, only one installation... anticipated. (c) Complex requests will take substantial time, will cause significant impact on responding...
32 CFR 806.6 - Prompt action on requests.
Code of Federal Regulations, 2011 CFR
2011-07-01
... quickly, with limited impact on the responding units. The request clearly identifies the records with no (or few) complicating factors involved. There are few or no responsive records, only one installation... anticipated. (c) Complex requests will take substantial time, will cause significant impact on responding...
32 CFR 806.6 - Prompt action on requests.
Code of Federal Regulations, 2014 CFR
2014-07-01
... quickly, with limited impact on the responding units. The request clearly identifies the records with no (or few) complicating factors involved. There are few or no responsive records, only one installation... anticipated. (c) Complex requests will take substantial time, will cause significant impact on responding...
32 CFR 806.6 - Prompt action on requests.
Code of Federal Regulations, 2013 CFR
2013-07-01
... quickly, with limited impact on the responding units. The request clearly identifies the records with no (or few) complicating factors involved. There are few or no responsive records, only one installation... anticipated. (c) Complex requests will take substantial time, will cause significant impact on responding...
VizieR Online Data Catalog: HI data cubes of 4 edge-on spiral galaxies (Allaert+, 2015)
NASA Astrophysics Data System (ADS)
Allaert, F.; Gentile, G.; Baes, M.; de Geyter, G.; Hughes, T. M.; Lewis, F.; Bianchi, S.; de Looze, I.; Fritz, J.; Holwerda, B. W.; Verstappen, J.; Viaene, S.
2015-09-01
The reduced and Cleaned HI data cubes of the HEROES galaxies NGC 973, UGC 4277, NGC 5529 and NGC 5907 are presented as FITS files. The equatorial coordinates and the beam FWHM, velocity resolution and rms noise of the data cubes are given in a separate table. NGC 973 and UGC 4277 were observed by the authors with the GMRT. The total time on source was 5.7 and 6.2 hours, respectively. For NGC 5529, the data were obtained by Kregel et al. (2004MNRAS.352..768K) using the Maxi-Short configuration of the WSRT, with a total time on source of 11.9 hours. Finally, NGC 5907 was observed by Shang et al. (1998ApJ...504L..23S) with the VLA in Modified C configuration. The total time on source was 4.7 hours. The raw interferometric data can be obtained from the online data archives of the telescopes in question. For IC 2531 and NGC 4217, the reduced data were made available to us by S. Peters (Peters et al., 2013arXiv1303.2463P) and M. Verheijen (Verheijen & Sancisi, 2001A&A...370..765V), respectively. We refer the user to the original papers for further questions or requests about the data. (2 data files).
42 CFR 137.227 - How much time does the Secretary have to act on a waiver request?
Code of Federal Regulations, 2010 CFR
2010-10-01
... HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Regulation Waiver § 137.227 How much time does the Secretary have to act on a waiver request? The Secretary...
Real-time edge-enhanced optical correlator
NASA Technical Reports Server (NTRS)
Liu, Tsuen-Hsi (Inventor); Cheng, Li-Jen (Inventor)
1992-01-01
Edge enhancement of an input image by four-wave mixing a first write beam with a second write beam in a photorefractive crystal, GaAs, was achieved for VanderLugt optical correlation with an edge enhanced reference image by optimizing the power ratio of a second write beam to the first write beam (70:1) and optimizing the power ratio of a read beam, which carries the reference image to the first write beam (100:701). Liquid crystal TV panels are employed as spatial light modulators to change the input and reference images in real time.
Beam-dynamics codes used at DARHT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ekdahl, Jr., Carl August
Several beam simulation codes are used to help gain a better understanding of beam dynamics in the DARHT LIAs. The most notable of these fall into the following categories: for beam production – Tricomp Trak orbit tracking code, LSP Particle in cell (PIC) code, for beam transport and acceleration – XTR static envelope and centroid code, LAMDA time-resolved envelope and centroid code, LSP-Slice PIC code, for coasting-beam transport to target – LAMDA time-resolved envelope code, LSP-Slice PIC code. These codes are also being used to inform the design of Scorpius.
Plasma boundary shape control and real-time equilibrium reconstruction on NSTX-U
Boyer, M. D.; Battaglia, D. J.; Mueller, D.; ...
2018-01-25
Here, the upgrade to the National Spherical Torus eXperiment (NSTX-U) included two main improvements: a larger center-stack, enabling higher toroidal field and longer pulse duration, and the addition of three new tangentially aimed neutral beam sources, which increase available heating and current drive, and allow for flexibility in shaping power, torque, current, and particle deposition profiles. To best use these new capabilities and meet the high-performance operational goals of NSTX-U, major upgrades to the NSTX-U control system (NCS) hardware and software have been made. Several control algorithms, including those used for real-time equilibrium reconstruction and shape control, have been upgradedmore » to improve and extend plasma control capabilities. As part of the commissioning phase of first plasma operations, the shape control system was tuned to control the boundary in both inner-wall limited and diverted discharges. It has been used to accurately track the requested evolution of the boundary (including the size of the inner gap between the plasma and central solenoid, which is a challenge for the ST configuration), X-point locations, and strike point locations, enabling repeatable discharge evolutions for scenario development and diagnostic commissioning.« less
Plasma boundary shape control and real-time equilibrium reconstruction on NSTX-U
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boyer, M. D.; Battaglia, D. J.; Mueller, D.
Here, the upgrade to the National Spherical Torus eXperiment (NSTX-U) included two main improvements: a larger center-stack, enabling higher toroidal field and longer pulse duration, and the addition of three new tangentially aimed neutral beam sources, which increase available heating and current drive, and allow for flexibility in shaping power, torque, current, and particle deposition profiles. To best use these new capabilities and meet the high-performance operational goals of NSTX-U, major upgrades to the NSTX-U control system (NCS) hardware and software have been made. Several control algorithms, including those used for real-time equilibrium reconstruction and shape control, have been upgradedmore » to improve and extend plasma control capabilities. As part of the commissioning phase of first plasma operations, the shape control system was tuned to control the boundary in both inner-wall limited and diverted discharges. It has been used to accurately track the requested evolution of the boundary (including the size of the inner gap between the plasma and central solenoid, which is a challenge for the ST configuration), X-point locations, and strike point locations, enabling repeatable discharge evolutions for scenario development and diagnostic commissioning.« less
Plasma boundary shape control and real-time equilibrium reconstruction on NSTX-U
NASA Astrophysics Data System (ADS)
Boyer, M. D.; Battaglia, D. J.; Mueller, D.; Eidietis, N.; Erickson, K.; Ferron, J.; Gates, D. A.; Gerhardt, S.; Johnson, R.; Kolemen, E.; Menard, J.; Myers, C. E.; Sabbagh, S. A.; Scotti, F.; Vail, P.
2018-03-01
The upgrade to the National Spherical Torus eXperiment (NSTX-U) included two main improvements: a larger center-stack, enabling higher toroidal field and longer pulse duration, and the addition of three new tangentially aimed neutral beam sources, which increase available heating and current drive, and allow for flexibility in shaping power, torque, current, and particle deposition profiles. To best use these new capabilities and meet the high-performance operational goals of NSTX-U, major upgrades to the NSTX-U control system (NCS) hardware and software have been made. Several control algorithms, including those used for real-time equilibrium reconstruction and shape control, have been upgraded to improve and extend plasma control capabilities. As part of the commissioning phase of first plasma operations, the shape control system was tuned to control the boundary in both inner-wall limited and diverted discharges. It has been used to accurately track the requested evolution of the boundary (including the size of the inner gap between the plasma and central solenoid, which is a challenge for the ST configuration), X-point locations, and strike point locations, enabling repeatable discharge evolutions for scenario development and diagnostic commissioning.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., the person submitting the request may appeal the denial to the Commission. (b) Time for appeal. An... initial denial and should, in order to expedite the appellate process and give the requester an opportunity to present his arguments, contain a brief statement of the reasons why the requester believes the...
78 FR 13643 - Proposed Information Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... ensure that requested data can be provided in the desired format, reporting burden (time and financial... requirement on respondents can be properly assessed. Currently, CNCS is soliciting comments concerning its... report via eGrants. Copies of the information collection request can be obtained by contacting the office...
78 FR 77169 - Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-20
... program helps to ensure that requested data can be provided in the desired format, reporting burden (time... of collection requirements on respondents can be properly assessed. Currently, the Office of Workers... Expenses (LS-265). A copy of the proposed information collection request can be obtained by contacting the...
75 FR 69128 - Proposed Collection, Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-10
... ensure that requested data can be provided in the desired format, reporting burden (time and financial... requirements on respondents can be properly assessed. The Bureau of Labor Statistics (BLS) is soliciting... Goods and Services Survey.'' A copy of the proposed information collection request (ICR) can be obtained...
17 CFR 200.304 - Disclosure of requested records.
Code of Federal Regulations, 2011 CFR
2011-04-01
... ORGANIZATION; CONDUCT AND ETHICS; AND INFORMATION AND REQUESTS Regulations Pertaining to the Privacy of Individuals and Systems of Records Maintained by the Commission § 200.304 Disclosure of requested records. (a... Commission's staff as are necessary to prevent the unauthorized disclosure at the same time of information...
76 FR 7591 - Agency Information Collection Activities: Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-10
... NATIONAL ARCHIVES AND RECORDS ADMINISTRATION Agency Information Collection Activities: Submission for OMB Review; Comment Request AGENCY: National Archives and Records Administration (NARA). ACTION... in a timely fashion the volume of requests received for these records and the need to obtain specific...
Studies on Beam Formation in an Atomic Beam Source
NASA Astrophysics Data System (ADS)
Nass, A.; Stancari, M.; Steffens, E.
2009-08-01
Atomic beam sources (ABS) are widely used workhorses producing polarized atomic beams for polarized gas targets and polarized ion sources. Although they have been used for decades the understanding of the beam formation processes is crude. Models were used more or less successfully to describe the measured intensity and beam parameters. ABS's are also foreseen for future experiments, such as PAX [1]. An increase of intensity at a high polarization would be beneficial. A direct simulation Monte-Carlo method (DSMC) [2] was used to describe the beam formation of a hydrogen or deuterium beam in an ABS. For the first time a simulation of a supersonic gas expansion on a molecular level for this application was performed. Beam profile and Time-of-Flight measurements confirmed the simulation results. Furthermore a new method of beam formation was tested, the Carrier Jet method [3], based on an expanded beam surrounded by an over-expanded carrier jet.
NASA Astrophysics Data System (ADS)
Yin, Stuart (Shizhuo); Chao, Ju-Hung; Zhu, Wenbin; Chen, Chang-Jiang; Campbell, Adrian; Henry, Michael; Dubinskiy, Mark; Hoffman, Robert C.
2017-08-01
In this paper, we present a novel large capacity (a 1000+ channel) time division multiplexing (TDM) laser beam combining technique by harnessing a state-of-the-art nanosecond speed potassium tantalate niobate (KTN) electro-optic (EO) beam deflector as the time division multiplexer. The major advantages of TDM approach are: (1) large multiplexing capability (over 1000 channels), (2) high spatial beam quality (the combined beam has the same spatial profile as the individual beam), (3) high spectral beam quality (the combined beam has the same spectral width as the individual beam, and (4) insensitive to the phase fluctuation of individual laser because of the nature of the incoherent beam combining. The quantitative analyses show that it is possible to achieve over one hundred kW average power, single aperture, single transverse mode solid state and/or fiber laser by pursuing this innovative beam combining method, which represents a major technical advance in the field of high energy lasers. Such kind of 100+ kW average power diffraction limited beam quality lasers can play an important role in a variety of applications such as laser directed energy weapons (DEW) and large-capacity high-speed laser manufacturing, including cutting, welding, and printing.
42 CFR 405.1104 - Request for MAC review when an ALJ does not issue a decision timely.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 2 2011-10-01 2011-10-01 false Request for MAC review when an ALJ does not issue a... under § 405.1016 may request MAC review if— (1) The appellant files a written request with the ALJ to... escalation or 5 calendar days from the end of the applicable adjudication period set forth in § 405.1016. (b...
42 CFR 405.1104 - Request for MAC review when an ALJ does not issue a decision timely.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 2 2010-10-01 2010-10-01 false Request for MAC review when an ALJ does not issue a... under § 405.1016 may request MAC review if— (1) The appellant files a written request with the ALJ to... escalation or 5 calendar days from the end of the applicable adjudication period set forth in § 405.1016. (b...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Can the FAB request a further response from....317 Can the FAB request a further response from the claimant or return a claim to the district office? At any time before the issuance of its final decision, the FAB may request that the claimant submit...
12 CFR 1102.306 - Procedures for requesting records.
Code of Federal Regulations, 2011 CFR
2011-01-01
... section; (B) Where the running of such time is suspended for the calculation of a cost estimate for the... section; (C) Where the running of such time is suspended for the payment of fees pursuant to the paragraph... of the invoice. (ix) The time limit for the ASC to respond to a request will not begin to run until...
20 CFR 30.421 - What are the time frames for submitting bills and reimbursement requests?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false What are the time frames for submitting bills and reimbursement requests? 30.421 Section 30.421 Employees' Benefits OFFICE OF WORKERS' COMPENSATION... AMENDED Medical and Related Benefits Medical Bills § 30.421 What are the time frames for submitting bills...
40 CFR 1515.9 - Extending CEQ's time to respond.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Extending CEQ's time to respond. 1515... ACT PROCEDURES Procedures for Requesting Records § 1515.9 Extending CEQ's time to respond. (a) In... request (§§ 1515.6(a) and 1515.8(d)) may be extended by the Council for not more than 10 working days...
40 CFR 1515.9 - Extending CEQ's time to respond.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Extending CEQ's time to respond. 1515... ACT PROCEDURES Procedures for Requesting Records § 1515.9 Extending CEQ's time to respond. (a) In... request (§§ 1515.6(a) and 1515.8(d)) may be extended by the Council for not more than 10 working days...
40 CFR 1515.9 - Extending CEQ's time to respond.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Extending CEQ's time to respond. 1515... ACT PROCEDURES Procedures for Requesting Records § 1515.9 Extending CEQ's time to respond. (a) In... request (§§ 1515.6(a) and 1515.8(d)) may be extended by the Council for not more than 10 working days...
40 CFR 1515.9 - Extending CEQ's time to respond.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Extending CEQ's time to respond. 1515... ACT PROCEDURES Procedures for Requesting Records § 1515.9 Extending CEQ's time to respond. (a) In... request (§§ 1515.6(a) and 1515.8(d)) may be extended by the Council for not more than 10 working days...
18 CFR 701.205 - Time limit for requester to appeal an initial adverse determination.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Time limit for requester to appeal an initial adverse determination. 701.205 Section 701.205 Conservation of Power and Water Resources WATER RESOURCES COUNCIL COUNCIL ORGANIZATION Availability of Information § 701.205 Time limit for...
Upgrade to a programmable timing system for the KOMAC proton linac and multi-purpose beam lines
NASA Astrophysics Data System (ADS)
Song, Young-Gi
2016-09-01
The KOMAC facility consists of low-energy components, including a 50-keV ion source, a lowenergy beam transport (LEBT), a 3-MeV radio-frequency quadrupole (RFQ), and a 20-MeV drift tube linac (DTL), as well as high-energy components, including seven DTL tanks for the 100-MeV proton beam. The KOMAC includes ten beam lines, five for 20-MeV beams and five for 100-MeV beams. The peak beam current and the maximum beam duty are 20 mA and 24% for the 20-MeV linac and 20 mA and 8% for the 100-MeV linac, respectively. Four high-voltage convertor modulators are used. Each modulator drives two or three klystrons. The peak output power is 5.8 MW, and the average power is 520 kW with a duty of 9%. The pulse width and repetition rate are 1.5 ms and 60 Hz, respectively. Each component of the pulsed operation mode has a timing trigger signal with precision synchronization. A timing system for beam extraction and for diagnostic components is required to provide precise pulse signals synchronized with a 300-MHz RF reference frequency. In addition, the timing parameters should be capable of real-time changes in accordance with the beam power. The KOMAC timing system has been upgraded to a programmable Micro Research Finland (MRF) event timing system that is synchronized with the RF, AC main frequency and with the global positioning system (GPS) 1-PPS signal. The event timing system consists of an event generator (EVG) and an event receiver (EVR). The event timing system is integrated with the KOMAC control system by using experimental physics and industrial control system (EPICS) software. For preliminary hardware and software testing, a long operation test with a synchronization of 300-MHz RF reference and 60-Hz AC has been completed successfully. In this paper, we will describe the software implementation, the testing, and the installation of the new timing system.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Friedman, A.; Grote, D. P.; Vay, J. L.
2015-05-29
The Fusion Energy Sciences Advisory Committee’s subcommittee on non-fusion applications (FESAC NFA) is conducting a survey to obtain information from the fusion community about non-fusion work that has resulted from their DOE-funded fusion research. The subcommittee has requested that members of the community describe recent developments connected to the activities of the DOE Office of Fusion Energy Sciences. Two questions in particular were posed by the subcommittee. This document contains the authors’ responses to those questions.
42 CFR 456.521 - Conditions for granting variance requests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Review Plans: FFP, Waivers, and Variances for Hospitals and Mental Hospitals Ur Plan: Remote Facility Variances from Time... is unable to meet the time requirements for which the variance is requested; and (2) A revised UR...
NASA Astrophysics Data System (ADS)
Park, Minho; Na, Yong-Su; Seo, Jaemin; Kim, M.; Kim, Kyungjin
2018-01-01
We report the effect of the electron cyclotron (EC) beam width on the full suppression time of neoclassical tearing mode (NTM) using the finite difference method (FDM) based minimum seeking controller in ITER. An integrated numerical system is setup for time-dependent simulations of the NTM evolution in ITER by solving the modified Rutherford equation together with the plasma equilibrium, transport, and EC heating and current drive. The calculated magnetic island width and growth rate is converted to the Mirnov diagnostic signal as an input to the controller to mimic the real experiment. In addition, 10% of the noise is enforced to this diagnostic signal to evaluate the robustness of the controller. To test the dependency of the NTM stabilization time on the EC beam width, the EC beam width scan is performed for a perfectly aligned case first, then for cases with the feedback control using the minimum seeking controller. When the EC beam is perfectly aligned, the narrower the EC beam width, the smaller the NTM stabilization time is observed. As the beam width increases, the required EC power increases exponentially. On the other hand, when the minimum seeking controller is applied, NTM stabilization sometimes fails as the EC beam width decreases. This is consistently observed in the simulation with various representations of the noise as well as without the noise in the Mirnov signal. The higher relative misalignment, misalignment divided by the beam width, is found to be the reason for the failure with the narrower beam widths. The EC stabilization effect can be lower for the narrower beam widths than the broader ones even at the same misalignment due to the smaller ECCD at the island O-point. On the other hand, if the EC beam is too wide, the NTM stabilization time takes too long. Accordingly, the optimal EC beam width range is revealed to exist in the feedback stabilization of NTM.
49 CFR 7.31 - Initial determinations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Transportation Office of the Secretary of Transportation PUBLIC AVAILABILITY OF INFORMATION Time Limits § 7.31... working days in accordance with § 7.33. The person making the request will be notified immediately of such... promptly as possible. If the determination is to deny the request, the person making the request will be...
50 CFR 600.1003 - Content of a request for a financed program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... requester's endorsement in principle of the reduction amendment specifications in the business plan. Endorsement in principle is non-binding. (h) Request that NMFS conduct, at the appropriate time, a referendum... operating economics of typical harvesters in the reduction fishery, with particular emphasis on the extent...
12 CFR 1272.7 - Examinations; requests for additional information.
Code of Federal Regulations, 2014 CFR
2014-01-01
... information. 1272.7 Section 1272.7 Banks and Banking FEDERAL HOUSING FINANCE AGENCY FEDERAL HOME LOAN BANKS NEW BUSINESS ACTIVITIES § 1272.7 Examinations; requests for additional information. (a) General... business activity, nothing in this part shall limit the right of the FHFA at any time to: (1) Request...
12 CFR 1272.7 - Examinations; requests for additional information.
Code of Federal Regulations, 2012 CFR
2012-01-01
... information. 1272.7 Section 1272.7 Banks and Banking FEDERAL HOUSING FINANCE AGENCY FEDERAL HOME LOAN BANKS NEW BUSINESS ACTIVITIES § 1272.7 Examinations; requests for additional information. (a) General... business activity, nothing in this part shall limit the right of the FHFA at any time to: (1) Request...
12 CFR 1272.7 - Examinations; requests for additional information.
Code of Federal Regulations, 2013 CFR
2013-01-01
... information. 1272.7 Section 1272.7 Banks and Banking FEDERAL HOUSING FINANCE AGENCY FEDERAL HOME LOAN BANKS NEW BUSINESS ACTIVITIES § 1272.7 Examinations; requests for additional information. (a) General... business activity, nothing in this part shall limit the right of the FHFA at any time to: (1) Request...
Code of Federal Regulations, 2010 CFR
2010-01-01
... circumstances prevent the filing of BTS Form 298-C on or before the due date, a written request for an extension may be submitted. Except in cases of emergency, the request must be delivered to the BTS's Office of...
78 FR 35981 - Proposed Extension of the Approval of Information Collection Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-14
... format, reporting burden (time and financial resources) is minimized, collection instruments are clearly...: Medical Travel Refund Request (OWCP-957). A copy of the proposed information collection request can be... beneficiaries for travel expenses for covered medical treatment. In order to determine whether amounts requested...
75 FR 7292 - Proposed Extension of the Approval of Information Collection Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-18
... format, reporting burden (time and financial resources) is minimized, collection instruments are clearly...: Medical Travel Refund Request (OWCP-957). A copy of the proposed information collection request can be... beneficiaries for travel expenses for covered medical treatment. In order to determine whether amounts requested...
36 CFR 404.4 - Access to information.
Code of Federal Regulations, 2010 CFR
2010-07-01
... to the person making the request shall include the names of the individuals who participated in the...; (iii) The loss of substantial due process rights; or (iv) A matter of widespread and exceptional media... making the request if the request cannot be processed within the time limit specified in paragraph (f) of...
76 FR 74838 - Agency Information Collection Activities: Proposed Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-01
... their disability or resources that might influence SSA's unfavorable determination. We may use the... hearing to appeal the decision. To request a hearing, individuals use Form HA-501, the associated... request within the prescribed time; is the proper party; and has taken the steps necessary to obtain the...
32 CFR 724.812 - Responsibilities of the Reading Room.
Code of Federal Regulations, 2010 CFR
2010-07-01
... timely responses to such requests, certain factors such as the length of a request, the volume of other... directives and regulations. The manual that accompanies the index of decisions shall notify the public that... Room (including requests for purchase of indexes) shall be addressed to: DA Military Review Board...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requesting a waiver. (1) A request for a waiver must be submitted in writing at the time the application is submitted to the Office of Pesticide Programs' Document Processing Desk at the appropriate address as set... document must be submitted with the waiver request that is submitted to the Office of Pesticide Programs...
47 CFR 0.504 - Processing requests for declassification.
Code of Federal Regulations, 2011 CFR
2011-10-01
... and review time required to process the request. A final determination shall be made within one year... warrants protection, it shall be declassified and made available to the requester, unless withholding is... appeal the denial to the Classification Review Committee, and given notice that such an appeal must be...
47 CFR 0.504 - Processing requests for declassification.
Code of Federal Regulations, 2010 CFR
2010-10-01
... and review time required to process the request. A final determination shall be made within one year... warrants protection, it shall be declassified and made available to the requester, unless withholding is... appeal the denial to the Classification Review Committee, and given notice that such an appeal must be...
38 CFR 17.67 - Request for a hearing.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Community Residential Care § 17.67 Request for a hearing. The community residential care facility operator... of VA approval until the hearing official issues a written decision on the community residential care... after the time limit, if the community residential care facility shows that the failure of the request...
Improved Timing Scheme for Spaceborne Precipitation Radar
NASA Technical Reports Server (NTRS)
Berkun, Andrew; Fischman, Mark
2004-01-01
An improved timing scheme has been conceived for operation of a scanning satellite-borne rain-measuring radar system. The scheme allows a real-time-generated solution, which is required for auto targeting. The current timing scheme used in radar satellites involves pre-computing a solution that allows the instrument to catch all transmitted pulses without transmitting and receiving at the same time. Satellite altitude requires many pulses in flight at any time, and the timing solution to prevent transmit and receive operations from colliding is usually found iteratively. The proposed satellite has a large number of scanning beams each with a different range to target and few pulses per beam. Furthermore, the satellite will be self-targeting, so the selection of which beams are used will change from sweep to sweep. The proposed timing solution guarantees no echo collisions, can be generated using simple FPGA-based hardware in real time, and can be mathematically shown to deliver the maximum number of pulses per second, given the timing constraints. The timing solution is computed every sweep, and consists of three phases: (1) a build-up phase, (2) a feedback phase, and (3) a build-down phase. Before the build-up phase can begin, the beams to be transmitted are sorted in numerical order. The numerical order of the beams is also the order from shortest range to longest range. Sorting the list guarantees no pulse collisions. The build-up phase begins by transmitting the first pulse from the first beam on the list. Transmission of this pulse starts a delay counter, which stores the beam number and the time delay to the beginning of the receive window for that beam. The timing generator waits just long enough to complete the transmit pulse plus one receive window, then sends out the second pulse. The second pulse starts a second delay counter, which stores its beam number and time delay. This process continues until an output from the first timer indicates there is less than one transmit pulse width until the start of the next receive event. This blocks future transmit pulses in the build-up phase. The feedback phase begins with the first timer paying off and starting the first receive window. When the first receive window is complete, the timing generator transmits the next beam from the list. When the second timer pays off, the second receive event is started. Following the second receive event, the timing generator will transmit the next beam on the list and start an additional timer. The timers work in a circular buffer fashion so there only need to be enough to cover the maximum number of echoes in flight.
Beyond space and time: advanced selection for seismological data
NASA Astrophysics Data System (ADS)
Trabant, C. M.; Van Fossen, M.; Ahern, T. K.; Casey, R. E.; Weertman, B.; Sharer, G.; Benson, R. B.
2017-12-01
Separating the available raw data from that useful for any given study is often a tedious step in a research project, particularly for first-order data quality problems such as broken sensors, incorrect response information, and non-continuous time series. With the ever increasing amounts of data available to researchers, this chore becomes more and more time consuming. To assist users in this pre-processing of data, the IRIS Data Management Center (DMC) has created a system called Research Ready Data Sets (RRDS). The RRDS system allows researchers to apply filters that constrain their data request using criteria related to signal quality, response correctness, and high resolution data availability. In addition to the traditional selection methods of stations at a geographic location for given time spans, RRDS will provide enhanced criteria for data selection based on many of the measurements available in the DMC's MUSTANG quality control system. This means that data may be selected based on background noise (tolerance relative to high and low noise Earth models), signal-to-noise ratio for earthquake arrivals, signal RMS, instrument response corrected signal correlation with Earth tides, time tear (gaps/overlaps) counts, timing quality (when reported in the raw data by the datalogger) and more. The new RRDS system is available as a web service designed to operate as a request filter. A request is submitted containing the traditional station and time constraints as well as data quality constraints. The request is then filtered and a report is returned that indicates 1) the request that would subsequently be submitted to a data access service, 2) a record of the quality criteria specified and 3) a record of the data rejected based on those criteria, including the relevant values. This service can be used to either filter a request prior to requesting the actual data or to explore which data match a set of enhanced criteria without downloading the data. We are optimistic this capability will reduce the initial data culling steps most researchers go through. Additionally, use of this service should reduce the amount of data transmitted from the DMC, easing the workload for our finite shared resources.
Short rise time intense electron beam generator
Olson, Craig L.
1987-01-01
A generator for producing an intense relativistic electron beam having a subnanosecond current rise time includes a conventional generator of intense relativistic electrons feeding into a short electrically conductive drift tube including a cavity containing a working gas at a low enough pressure to prevent the input beam from significantly ionizing the working gas. Ionizing means such as a laser simultaneously ionize the entire volume of working gas in the cavity to generate an output beam having a rise time less than one nanosecond.
Short rise time intense electron beam generator
Olson, C.L.
1984-03-16
A generator for producing an intense relativisitc electron beam having a subnanosecond current rise time includes a conventional generator of intense relativistic electrons feeding into a short electrically conductive drift tube including a cavity containing a working gas at a low enough pressure to prevent the input beam from significantly ionizing the working gas. Ionizing means such as a laser simultaneously ionize the entire volume of working gas in the cavity to generate an output beam having a rise time less than one nanosecond.
NASA Astrophysics Data System (ADS)
He, Xiaozhong; Pang, Jian; Chen, Nan; Li, Qin; Dai, Wenhua; Ma, Chaofan; Zhao, Liangchao; Gao, Feng; Dai, Zhiyong
2017-06-01
The authors previously reported that the axial B-dots can be used to directly measure the beam tilt and demonstrated that the axial B-dots are applicable to a coaxial calibration stand. In this study, a combined B-dot monitor composed of four axial B-dot loops and four azimuthal ones is tested for the simultaneous measurement of the time-varying beam current, beam offset, and beam tilt at the output of the injector of the DRAGON-I induction linac. In the experiments, the beam offset and beam tilt at the position of the monitor are proportionally adjusted using a pair of steering coils. Eight waveforms acquired from the B-dot monitor are analyzed to reconstruct the time-varying beam current, beam offset, and beam tilt. The original signals of both the azimuthal B-dot and the axial B-dot ports change significantly with respect to the current applied to the steering coils. The measured beam tilt is linearly dependent on the current applied to the steering coils and agrees well with the measured beam offset.
RFQ beam cooler and buncher for collinear laser spectroscopy of rare isotopes
NASA Astrophysics Data System (ADS)
Barquest, B. R.; Bollen, G.; Mantica, P. F.; Minamisono, K.; Ringle, R.; Schwarz, S.; Sumithrarachchi, C. S.
2017-09-01
A radiofrequency quadrupole (RFQ) ion beam cooler and buncher has been developed to deliver bunched beams with low transverse emittance, energy spread, and time spread to the BECOLA collinear laser spectroscopy system at the National Superconducting Cyclotron Laboratory (NSCL) at Michigan State University. The beam cooler and buncher contains new features which enhance performance, especially for high count rate beams, as well as simplifying construction, maintenance, and operation. The transverse emittance, energy spread, and time spread of the bunched beam, as well as buncher efficiency are reported, showcasing the capabilities of the BECOLA facility to perform collinear laser spectroscopy measurements with bunched rare isotope beams at NSCL and at the future Facility for Rare Isotope Beams (FRIB).
Time resolving beam position measurement and analysis of beam unstable movement in PSR
NASA Astrophysics Data System (ADS)
Aleksandrov, A. V.
2000-11-01
Precise measurement of beam centroid movement is very important for understanding the fast transverse instability in the Los Alamos Proton Storage Ring (PSR). Proton bunch in the PSR is long thus different parts of the bunch can have different betatron phase and move differently therefore time resolving position measurement is needed. Wide band strip line BPM can be adequate if proper processing algorithm is used. In this work we present the results of the analysis of unstable transverse beam motion using time resolving processing algorithm. Suggested algorithm allows to calculate transverse position of different parts of the beam on each turn, then beam centroid movement on successive turns can be developed in series of plane travelling waves in the beam frame of reference thus providing important information on instability development. Some general features of fast transverse instability, unknown before, are discovered.
Superconducting resonator used as a beam phase detector.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sharamentov, S. I.; Pardo, R. C.; Ostroumov, P. N.
2003-05-01
Beam-bunch arrival time has been measured for the first time by operating superconducting cavities, normally part of the linac accelerator array, in a bunch-detecting mode. The very high Q of the superconducting cavities provides high sensitivity and allows for phase-detecting low-current beams. In detecting mode, the resonator is operated at a very low field level comparable to the field induced by the bunched beam. Because of this, the rf field in the cavity is a superposition of a 'pure' (or reference) rf and the beam-induced signal. A new method of circular phase rotation (CPR), allowing extraction of the beam phasemore » information from the composite rf field was developed. Arrival time phase determination with CPR is better than 1{sup o} (at 48 MHz) for a beam current of 100 nA. The electronics design is described and experimental data are presented.« less
SKOLAR MD: A Model for Self-Directed, In-Context Continuing Medical Education
Strasberg, Howard R.; Rindfleisch, Thomas C.; Hardy, Steven
2003-01-01
INTRODUCTION SKOLAR has implemented a web-based CME program with which physicians can earn AMA Category 1 credit for self-directed learning. METHODS Physicians researched their questions in SKOLAR and applied for CME. Physician auditors reviewed all requests across two phases of the project. A selection rule set was derived from phase one and used in phase two to flag a subset of requests for detailed review. The selection rule set is described. RESULTS In phase one, SKOLAR received 1039 CME applications. Applicants frequently found their answer (94%) and would apply it clinically (93%). A linear regression analysis comparing time awarded to time requested (capped at actual time spent) had R2=0.79. DISCUSSION We believe that hat this self-directed approach to CME is effective and an important complement to traditional CME programs. However, selective audit of self-directed CME requests is necessary to ensure validity of credits awarded. PMID:14728250
76 FR 15999 - Proposed Collection, Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-22
... time series analyses and industry comparisons, and in special studies such as analyses of... ensure that requested data can be provided in the desired format, reporting burden (time and financial... Classification System (NAICS) level, and at the national, State, MSA, and county levels. The QCEW series has...
77 FR 44580 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-30
... time. Type of Request: New collection. Burden Hours: 2,167. Number of Respondents: 13,000. Average... to the Strategic Plan for the 2020 Census. Designing and testing innovations are part of the planning... the individual respondent burden remains relatively unchanged from one time to another. Address...
Retarding field energy analyzer for high energy pulsed electron beam measurements.
Hu, Jing; Rovey, Joshua L; Zhao, Wansheng
2017-01-01
A retarding field energy analyzer (RFEA) designed specifically for high energy pulsed electron beam measurements is described in this work. By proper design of the entrance grid, attenuation grid, and beam collector, this RFEA is capable of determining the time-resolved energy distribution of high energy pulsed electron beams normally generated under "soft vacuum" environment. The performance of the RFEA is validated by multiple tests of the leakage current, attenuation coefficient, and response time. The test results show that the retarding potential in the RFEA can go up to the same voltage as the electron beam source, which is 20 kV for the maximum in this work. Additionally, an attenuation coefficient of 4.2 is obtained in the RFEA while the percent difference of the rise time of the electron beam pulse before and after attenuation is lower than 10%. When compared with a reference source, the percent difference of the RFEA response time is less than 10% for fall times greater than 35 ns. Finally, the test results of the 10 kV pseudospark-based pulsed electron beam currents collected under varying retarding potentials are presented in this paper.
Dynamic Beam Solutions for Real-Time Simulation and Control Development of Flexible Rockets
NASA Technical Reports Server (NTRS)
Su, Weihua; King, Cecilia K.; Clark, Scott R.; Griffin, Edwin D.; Suhey, Jeffrey D.; Wolf, Michael G.
2016-01-01
In this study, flexible rockets are structurally represented by linear beams. Both direct and indirect solutions of beam dynamic equations are sought to facilitate real-time simulation and control development for flexible rockets. The direct solution is completed by numerically integrate the beam structural dynamic equation using an explicit Newmark-based scheme, which allows for stable and fast transient solutions to the dynamics of flexile rockets. Furthermore, in the real-time operation, the bending strain of the beam is measured by fiber optical sensors (FOS) at intermittent locations along the span, while both angular velocity and translational acceleration are measured at a single point by the inertial measurement unit (IMU). Another study in this paper is to find the analytical and numerical solutions of the beam dynamics based on the limited measurement data to facilitate the real-time control development. Numerical studies demonstrate the accuracy of these real-time solutions to the beam dynamics. Such analytical and numerical solutions, when integrated with data processing and control algorithms and mechanisms, have the potential to increase launch availability by processing flight data into the flexible launch vehicle's control system.
Interferometric Quasi-Autocollimator
NASA Technical Reports Server (NTRS)
Turner, Matthew D. (Inventor); Gundlach, Jens H. (Inventor); Schlamminger, Stephan (Inventor); Hagedorn, Charles A. (Inventor)
2014-01-01
Systems and method are disclosed for measuring small angular deflections of a target using weak value amplification. A system includes a beam source, a beam splitter, a target reflecting surface, a photodetector, and a processor. The beam source generates an input beam that is split into first and second beams by the beam splitter. The first and second beams are propagated to the target reflecting surface, at least partially superimposed at the target reflecting surface, and incident to the target reflecting surface normal to the target reflecting surface. The first beam is reflected an additional even number of times during propagation to the photodetector. The second beam is reflected an additional odd number of times during propagation to the photodetector. The first and second beams interfere at the photodetector so as to produce interference patterns. The interference patterns are interpreted to measure angular deflections of the target reflecting surface.
NASA Astrophysics Data System (ADS)
Reid, Hamish A. S.; Kontar, Eduard P.
2018-06-01
Context. Solar type III radio bursts contain a wealth of information about the dynamics of electron beams in the solar corona and the inner heliosphere; this information is currently unobtainable through other means. However, the motion of different regions of an electron beam (front, middle, and back) have never been systematically analysed before. Aims: We characterise the type III burst frequency-time evolution using the enhanced resolution of LOFAR (LOw Frequency ARray) in the frequency range 30-70 MHz and use this to probe electron beam dynamics. Methods: The rise, peak, and decay times with a 0.2 MHz spectral resolution were defined for a collection of 31 type III bursts. The frequency evolution was used to ascertain the apparent velocities of the front, middle, and back of the type III sources, and the trends were interpreted using theoretical and numerical treatments. Results: The type III time profile was better approximated by an asymmetric Gaussian profile and not an exponential, as was used previously. Rise and decay times increased with decreasing frequency and showed a strong correlation. Durations were shorter than previously observed. Drift rates from the rise times were faster than from the decay times, corresponding to inferred mean electron beam speeds for the front, middle, and back of 0.2, 0.17, 0.15 c, respectively. Faster beam speeds correlate with shorter type III durations. We also find that the type III frequency bandwidth decreases as frequency decreases. Conclusions: The different speeds naturally explain the elongation of an electron beam in space as it propagates through the heliosphere. The expansion rate is proportional to the mean speed of the exciter; faster beams expand faster. Beam speeds are attributed to varying ensembles of electron energies at the front, middle, and back of the beam.
Interlibrary loan in U.S. health sciences libraries: journal article use.
Lacroix, E M
1994-01-01
Health sciences libraries in the United States use the National Library of Medicine (NLM) DOCLINE system to request more than two million items annually through interlibrary loan (ILL). Ninety-seven percent of all ILL requests are for journal articles. In this study, NLM analyzed four million ILL requests entered into the DOCLINE system during two twelve-month periods ending September 30, 1992. The requests were analyzed at both the journal title level and article level. Data for the two years were found to be remarkably similar. Results showed that a large number of journals are required to fill ILL requests and that there is a relatively low number of repeat requests for most journal articles. Seventy-six percent of journal articles analyzed were requested only once, and fewer than 1% were requested more than ten times. About 39% of journals used to fill ILL requests were indexed in MEDLINE at some time, while 84% of the articles supplied were indexed in MEDLINE. Ninety-two percent of articles supplied were from English-language journals. Sixty-seven percent of articles were published in the most recent five years, and 85% in the most recent ten years. The 100 most frequently requested articles for each of the two years were examined to determine characteristics such as language, where they were indexed, and the subject matter. This study has provided valuable information for planning of NLM's interlibrary document delivery services and also should have significance for libraries and other organizations involved in document delivery. Images PMID:7841903
Hattingh, Hendrika Laetitia; Varsani, Janki; Kachouei, Leila Ataei; Parsons, Richard
2016-08-30
A community pharmacy real-time electronic recording program, ProjectSTOP, enables Australian community pharmacists to verify pseudoephedrine requests. In Western Australia the program was available for voluntary use from April 2007 and became mandatory November 2010. This case study explores the effectiveness of the program by reviewing the total requests for pseudoephedrine products, and the proportion of requests which were classified as 'denied sales' before and after mandatory implementation. Seasonal and annual trends in these measures are also evaluated. ProjectSTOP data recordings for Western Australia pharmacies between 1 December 2007 and 28 February 2014 were analysed. Data included a de-identified pharmacy number and date of each pseudoephedrine product request. The total number of requests and sale classification (allowed, denied, safety, or not recorded) were calculated for each month/pharmacy. The potential influence of mandatory reporting using ProjectSTOP was investigated using a Regression Discontinuity Design. Correlations between sales from the same pharmacy were taken into account by classifying the pharmacy number as a random effect. The main effects of year (continuous variable), and season (categorical variable) were also included in the model. There was a small but steady decline in the total requests for pseudoephedrine per month per 100,000 population (per pharmacy) from the time of mandatory reporting. The number of denied sales showed a steady increase up until mandatory reporting, after which it showed a significant decline over time. Total sales were heavily influenced by season, as expected (highest in winter, least in summer). The seasonal pattern was less pronounced for denied sales, which were highest in winter and similar across other seasons. The pattern over time for safety sales was similar to that for denied sales, with a clear change occurring around the time of mandatory reporting. Results indicate a decrease in pseudoephedrine product requests in Western Australia community pharmacies. Findings suggest ProjectSTOP has been successful in addressing suspicious sales and potential diversion however ongoing data review is recommended.
Mönnikes, Hubert; Pfaffenberger, Bernd; Gatz, Gudrun; Hein, Jasper; Bardhan, Karna Dev
2007-01-01
A prime concern for gastroesophageal reflux disease (GERD) patients is fast symptom control. Sparse valid information is available on the rapidity of the effect of proton pump inhibitors in providing symptom relief. The new reflux questionnaire ReQuest is validated for daily assessment of changes in GERD symptoms. Therefore, this study investigated the efficacy of 20 mg pantoprazole and 20 mg esomeprazole with regard to the time to symptom relief in patients with endoscopy-negative GERD (enGERD) using ReQuest. 529 patients were treated with pantoprazole or esomeprazole over 4 weeks. ReQuest symptom scores were assessed daily. The mean and median times to first and sustained symptom relief were determined. Median time to first symptom relief was 2 days for both drugs (intention-to-treat population). The median time to sustained symptom relief was 3 days shorter with pantoprazole (10.0 vs. 13.0 days). The Hodges-Lehmann estimator for the difference in time to reach first and sustained symptom relief between both groups was 0.00 days. For both variables the one-sided 95% CI (Moses) was [0.00; infinity[, documenting no significant differences between the treatment groups. The rapidity of symptom control can be evaluated by clinically significant parameters using ReQuest. Pantoprazole and esomeprazole are equally effective in the time to first and sustained symptom relief. Copyright 2007 S. Karger AG, Basel.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-07
... portable instruments measure accurate emissions time series for very clean vehicles, such as Tier 2 (Bins 2... will then be submitted to OMB for review and approval. At that time, EPA will issue another Federal... response: one-time event. Total estimated burden: 1,213 hours (per year). Burden is defined at 5 CFR 1320.3...
METHOD AND APPARATUS FOR PULSING A CHARGED PARTICLE BEAM
Aaland, K.; Kuenning, R.W.; Harmon, R.K.
1961-05-01
A system is offered for pulsing a continuous beam of charged particles to form beam pulses that are consistently rectangular and of precise time durations which may be varied over an extremely wide range at a widely variable range of repetition rates. The system generally comprises spaced deflection plates on opposite sides of a beam axis in between which a unidirectional bias field is established to deflect the beam for impingement on an off-axis collector. The bias field is periodically neutralized by the application of fast rise time substantially rectangular pulses to one of the deflection plates in opposition to the bias field and then after a time delay to the other deflection plate in aiding relation to the bias field and during the flat crest portion of the bias opposing pulses. The voltage distribution of the resulting deflection field then includes neutral or zero portions which are of symmetrical substantially rectangular configuration relative to time and during which the beam axially passes the collector in the form of a substantially rectangular beam pulse.
78 FR 78694 - Airworthiness Directives; Airbus Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-27
... all Airbus Model A330-200 and -300 series airplanes, and Model A340-200 and -300 series airplanes. AD..., and corrective actions if needed. This new AD expands the applicability, reduces the compliance time... the comment received. Request To Change Compliance Time US Airways requested that we change the...
49 CFR 701.7 - Timing of responses to requests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... professional activity or occupation is information dissemination, though it need not be his sole occupation. A... PASSENGER CORPORATION (AMTRAK) AMTRAK FREEDOM OF INFORMATION ACT PROGRAM § 701.7 Timing of responses to... Freedom of Information Office. (2) A request for records shall be considered to have been received on the...
31 CFR 357.29 - Time required for processing transaction request.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 31 Money and Finance:Treasury 2 2013-07-01 2013-07-01 false Time required for processing transaction request. 357.29 Section 357.29 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY BUREAU OF THE PUBLIC DEBT REGULATIONS...
31 CFR 357.29 - Time required for processing transaction request.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 31 Money and Finance:Treasury 2 2011-07-01 2011-07-01 false Time required for processing transaction request. 357.29 Section 357.29 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY BUREAU OF THE PUBLIC DEBT REGULATIONS...
31 CFR 357.29 - Time required for processing transaction request.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 31 Money and Finance:Treasury 2 2012-07-01 2012-07-01 false Time required for processing transaction request. 357.29 Section 357.29 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY BUREAU OF THE PUBLIC DEBT REGULATIONS...
31 CFR 357.29 - Time required for processing transaction request.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 31 Money and Finance: Treasury 2 2014-07-01 2014-07-01 false Time required for processing transaction request. 357.29 Section 357.29 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY BUREAU OF THE FISCAL SERVICE REGULATIONS...
78 FR 16486 - Commission Information Collection Activities (FERC-606); Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-15
...-time employment). \\4\\ Average salary plus benefits per full-time equivalent employee. Comments... Requests for Further Information), to the Office of Management and Budget (OMB) for review of the... intended to allow agencies to assist the Commission to make better informed decisions in establishing due...
Code of Federal Regulations, 2010 CFR
2010-10-01
.... The rates for manual searching, computer operator/programmer time and time spent reviewing records... requested under subpart C of this part, including making it available for inspection, will be determined by... search. (b) The standard fee for a computer search for a record requested under subpart C of this part is...
Code of Federal Regulations, 2011 CFR
2011-10-01
.... The rates for manual searching, computer operator/programmer time and time spent reviewing records... requested under subpart C of this part, including making it available for inspection, will be determined by... search. (b) The standard fee for a computer search for a record requested under subpart C of this part is...
14 CFR 1274.911 - Patent rights.
Code of Federal Regulations, 2010 CFR
2010-01-01
... activities under this cooperative agreement and, upon timely request, NASA will use its best efforts to grant..., upon timely request, NASA will use its best efforts to grant the Recipient or designated Consortium... and/or stimulation rather than for acquiring property or services for the direct benefit or use of the...
45 CFR 612.5 - Timing of responses to requests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 3 2010-10-01 2010-10-01 false Timing of responses to requests. 612.5 Section 612.5 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION... lack of expedited treatment could reasonably be expected to pose an imminent threat to the life or...
37 CFR 102.6 - Time limits and expedited processing.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 37 Patents, Trademarks, and Copyrights 1 2014-07-01 2014-07-01 false Time limits and expedited processing. 102.6 Section 102.6 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE... properly process the particular request: (i) The need to search for and collect the requested records from...
37 CFR 102.6 - Time limits and expedited processing.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Time limits and expedited processing. 102.6 Section 102.6 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE... properly process the particular request: (i) The need to search for and collect the requested records from...
37 CFR 102.6 - Time limits and expedited processing.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 37 Patents, Trademarks, and Copyrights 1 2012-07-01 2012-07-01 false Time limits and expedited processing. 102.6 Section 102.6 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE... properly process the particular request: (i) The need to search for and collect the requested records from...
37 CFR 102.6 - Time limits and expedited processing.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 37 Patents, Trademarks, and Copyrights 1 2013-07-01 2013-07-01 false Time limits and expedited processing. 102.6 Section 102.6 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE... properly process the particular request: (i) The need to search for and collect the requested records from...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-28
... Time for Filing Requests for Reevaluation. FOR FURTHER INFORMATION CONTACT: Aaron Szabo, Financial Analyst, Financial Analysis and International Projects Branch, Division of Policy and Rulemaking, Office... Analysis and Recommendation In reaching this conclusion, the NRC staff considered the structure of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-28
...; Comment Request; Evaluation of State Expanded Learning Time AGENCY: Department of Education (ED), IES... State Expanded Learning Time. OMB Control Number: 1850-New. Type of Review: New information collection... conduct semi-structured interviews with 21st Century Community Learning Centers (21st CCLC) state...
45 CFR 612.5 - Timing of responses to requests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 3 2011-10-01 2011-10-01 false Timing of responses to requests. 612.5 Section 612.5 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION... lack of expedited treatment could reasonably be expected to pose an imminent threat to the life or...
45 CFR 612.5 - Timing of responses to requests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 45 Public Welfare 3 2012-10-01 2012-10-01 false Timing of responses to requests. 612.5 Section 612.5 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION... lack of expedited treatment could reasonably be expected to pose an imminent threat to the life or...
75 FR 61178 - Proposed Collection, Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-04
... both time-series indexes and cost levels for industry and occupational groups, thereby increasing the... ensure that requested data can be provided in the desired format, reporting burden (time and financial... Employee Compensation. The data provided will be the same, and the series will be continuous. The NCS will...
20 CFR 410.653 - Vacation of dismissal of request for hearing.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Vacation of dismissal of request for hearing... Determinations, Administrative Review, Finality of Decisions, and Representation of Parties § 410.653 Vacation of... and for good cause shown, vacate any dismissal of a request for hearing at any time within 60 days...
20 CFR 410.653 - Vacation of dismissal of request for hearing.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Vacation of dismissal of request for hearing... Determinations, Administrative Review, Finality of Decisions, and Representation of Parties § 410.653 Vacation of... and for good cause shown, vacate any dismissal of a request for hearing at any time within 60 days...
78 FR 32595 - Revision of Freedom of Information Act Regulation
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-31
... imminent threat to the life or physical safety of an individual, (2) a circumstance in which an urgent need... the request until the FOIA requester either makes a written, firm commitment to pay the anticipated... pay the anticipated fee, within the time period specified by HUD, will result in the request being...
16 CFR 4.8 - Costs for obtaining Commission records.
Code of Federal Regulations, 2013 CFR
2013-01-01
... section: (1) The term search includes all time spent looking, manually or by automated means, for material... use requesters will be charged for the direct costs to search for, review, and duplicate documents. A... public. (3) Other requesters. Other requesters will be charged for the direct costs to search for and...
16 CFR 4.8 - Costs for obtaining Commission records.
Code of Federal Regulations, 2014 CFR
2014-01-01
... section: (1) The term search includes all time spent looking, manually or by automated means, for material... use requesters will be charged for the direct costs to search for, review, and duplicate documents. A... public. (3) Other requesters. Other requesters will be charged for the direct costs to search for and...
16 CFR 4.8 - Costs for obtaining Commission records.
Code of Federal Regulations, 2012 CFR
2012-01-01
... section: (1) The term search includes all time spent looking, manually or by automated means, for material... use requesters will be charged for the direct costs to search for, review, and duplicate documents. A... public. (3) Other requesters. Other requesters will be charged for the direct costs to search for and...
77 FR 27491 - New Postal Product
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-10
..., April 30, 2012 (Request). Request. In support of its Request, the Postal Service filed six attachments... exceed 85 percent of the total volume of pieces mailed. Id. Valassis has agreed to initiate mailings... 1,000,000 pieces during the following 12 months or pay the Postal Service a one-time fee of $100,000...
17 CFR 200.304 - Disclosure of requested records.
Code of Federal Regulations, 2013 CFR
2013-04-01
... individual making the request is notified in writing within the 30 day period that, for good cause shown, a longer time is required. In such cases, the individual making the request shall be informed in writing of the difficulties encountered and an indication shall be given as to when it is anticipated that access...
17 CFR 200.304 - Disclosure of requested records.
Code of Federal Regulations, 2012 CFR
2012-04-01
... individual making the request is notified in writing within the 30 day period that, for good cause shown, a longer time is required. In such cases, the individual making the request shall be informed in writing of the difficulties encountered and an indication shall be given as to when it is anticipated that access...
17 CFR 200.304 - Disclosure of requested records.
Code of Federal Regulations, 2014 CFR
2014-04-01
... individual making the request is notified in writing within the 30 day period that, for good cause shown, a longer time is required. In such cases, the individual making the request shall be informed in writing of the difficulties encountered and an indication shall be given as to when it is anticipated that access...
31 CFR 363.39 - Will I receive a confirmation of my request to purchase a Treasury security?
Code of Federal Regulations, 2010 CFR
2010-07-01
... request to purchase a Treasury security? 363.39 Section 363.39 Money and Finance: Treasury Regulations... DEBT REGULATIONS GOVERNING SECURITIES HELD IN TREASURYDIRECT General Provisions Governing Securities... security? At the time that you submit a request to purchase a Treasury security through your TreasuryDirect...
12 CFR 263.25 - Request for document discovery from parties.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Request for document discovery from parties... Request for document discovery from parties. (a) General rule. Any party may serve on any other party a... a reasonable time, place, and manner for production and performing any related acts. In lieu of...
17 CFR Appendix B to Part 145 - Schedule of Fees
Code of Federal Regulations, 2011 CFR
2011-04-01
... furnished to the requester. Fees apply to various types of requests as follows. (1) Commercial use request... search or review time. (3) Representative of the news media. Only duplication fees will be charged to any person actively gathering news for an entity that is organized and operated to publish or broadcast news...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-18
... ensure that requested data can be provided in the desired format, reporting burden (time and financial... requirements on respondents can be properly assessed. Currently, the Employment and Training Administration is... Requirements. A copy of the proposed information collection request (ICR) can be obtained by contacting the...
12 CFR 1780.27 - Request for document discovery from parties.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Request for document discovery from parties... Proceedings § 1780.27 Request for document discovery from parties. (a) General rule. Any party may serve on... specify a reasonable time, place and manner for production and performing any related acts. In lieu of...
12 CFR 908.47 - Request for document discovery from parties.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Request for document discovery from parties... § 908.47 Request for document discovery from parties. (a) General rule. Any party may serve on any other... time, place and manner for production and performing any related acts. In lieu of inspecting the...
37 CFR 1.510 - Request for ex parte reexamination.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 37 Patents, Trademarks, and Copyrights 1 2014-07-01 2014-07-01 false Request for ex parte reexamination. 1.510 Section 1.510 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE... for Ex Parte Reexamination § 1.510 Request for ex parte reexamination. (a) Any person may, at any time...
37 CFR 1.510 - Request for ex parte reexamination.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Request for ex parte reexamination. 1.510 Section 1.510 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE... for Ex Parte Reexamination § 1.510 Request for ex parte reexamination. (a) Any person may, at any time...
37 CFR 1.510 - Request for ex parte reexamination.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 37 Patents, Trademarks, and Copyrights 1 2013-07-01 2013-07-01 false Request for ex parte reexamination. 1.510 Section 1.510 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE... for Ex Parte Reexamination § 1.510 Request for ex parte reexamination. (a) Any person may, at any time...
37 CFR 1.510 - Request for ex parte reexamination.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 37 Patents, Trademarks, and Copyrights 1 2012-07-01 2012-07-01 false Request for ex parte reexamination. 1.510 Section 1.510 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE... for Ex Parte Reexamination § 1.510 Request for ex parte reexamination. (a) Any person may, at any time...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-12
... INFORMATION: The Consumer Price Index (CPI) is a measure of the average change over time in the prices paid by... for OMB Review; Comment Request; Consumer Price Index Commodities and Services Survey ACTION: Notice...) sponsored information collection request (ICR) titled, ``Consumer Price Index Commodities and Services...
10 CFR 9.33 - Search, review, and special service fees.
Code of Federal Regulations, 2010 CFR
2010-01-01
... in excess of 100 pages when agency records are not sought for commercial use and the request is made...) Search time that exceeds two hours and duplication of agency records of more than 100 pages for requests... records plus the operator/programmer salary apportionable to the search. (b) The NRC may charge requesters...
77 FR 71170 - Notice of Public Roundtable on Genetic Diagnostic Testing
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-29
... so in writing no later than December 20, 2012. The request must include the following: (1) The name... email address); (3) the organization(s) the person represents, if any; and (4) an indication of the amount of time requested for the commentary. Requests to share commentary must be submitted by email to...
45 CFR 613.3 - Responding to requests for access to records.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 3 2013-10-01 2013-10-01 false Responding to requests for access to records. 613.3 Section 613.3 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PRIVACY ACT REGULATIONS § 613.3 Responding to requests for access to records. (a) Timing of...
45 CFR 613.3 - Responding to requests for access to records.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 45 Public Welfare 3 2012-10-01 2012-10-01 false Responding to requests for access to records. 613.3 Section 613.3 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PRIVACY ACT REGULATIONS § 613.3 Responding to requests for access to records. (a) Timing of...
45 CFR 613.3 - Responding to requests for access to records.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 3 2014-10-01 2014-10-01 false Responding to requests for access to records. 613.3 Section 613.3 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PRIVACY ACT REGULATIONS § 613.3 Responding to requests for access to records. (a) Timing of...
17 CFR 240.15c2-12 - Municipal securities disclosure.
Code of Federal Regulations, 2010 CFR
2010-04-01
... business day, by first-class mail or other equally prompt means, to any potential customer, on request, a... and in sufficient time to accompany any confirmation that requests payment from any customer, copies... other equally prompt means, to any potential customer, on request, a single copy of the final official...
45 CFR 1602.6 - Procedures for use of public reading room.
Code of Federal Regulations, 2010 CFR
2010-10-01
... § 1602.5(b) in the public reading room during regular business hours. Because it will sometimes be... records is advised to arrange a time in advance, by telephone or letter request made to the Office of Legal Affairs. Persons submitting requests by telephone will be notified whether a written request would...
26 CFR 1.6015-5 - Time and manner for requesting relief.
Code of Federal Regulations, 2014 CFR
2014-04-01
... equitable relief under § 1.6015-4, a requesting spouse must file Form 8857, “Request for Innocent Spouse Relief” (or other specified form); submit a written statement containing the same information required on Form 8857, which is signed under penalties of perjury; or submit information in the manner prescribed...
26 CFR 1.6015-5 - Time and manner for requesting relief.
Code of Federal Regulations, 2011 CFR
2011-04-01
... equitable relief under § 1.6015-4, a requesting spouse must file Form 8857, “Request for Innocent Spouse Relief” (or other specified form); submit a written statement containing the same information required on Form 8857, which is signed under penalties of perjury; or submit information in the manner prescribed...
34 CFR 5.62 - Advance payment of fees.
Code of Federal Regulations, 2010 CFR
2010-07-01
... anticipated cost and obtains satisfactory assurance of full payment if the requester has a history of prompt payment of FOIA fees; or (2) Requires an advance payment if the requester has no history of payment. (b) If a requester has previously failed to pay a fee in a timely fashion, the FOI Officer does not...
5 CFR 2604.504 - Miscellaneous fee provisions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... be required to provide satisfactory assurance of full payment where the requester has a history of... estimated charges in the case of requesters with no history of payment; or (2) A requester has previously failed to pay a fee charged in a timely fashion (i.e., within 30 days of the date of the billing). In...
12 CFR 1070.22 - Fees for processing requests for CFPB records.
Code of Federal Regulations, 2013 CFR
2013-01-01
... CFPB shall charge the requester for the actual direct cost of the search, including computer search time, runs, and the operator's salary. The fee for computer output will be the actual direct cost. For... and the cost of operating the computer to process a request) equals the equivalent dollar amount of...
NASA Astrophysics Data System (ADS)
Wang, Xinyi; Shen, Jialong; Liu, Xinbo
2018-01-01
Against the technical defects of universally applicable beam tube monitoring system at present, such as air suction in the beam tube, line clogging, long sampling time, etc., the paper analyzes the current situation of the spontaneous combustion fire disaster forecast of mine in our country and these defects one by one. On this basis, the paper proposes a research thought that improving the positive pressure beam tube so as to substitute the negative pressure beam tube. Then, the paper introduces the beam tube monitoring system based on positive pressure technology through theoretical analysis and experiment. In the comparison with negative pressure beam tube, the paper concludes the advantage of the new system and draws the conclusion that the positive pressure beam tube is superior to the negative pressure beam tube system both in test result and test time. At last, the paper proposes prospect of the beam tube monitoring system based on positive pressure technology.
Maternal deaths in eastern Indonesia: 20 years and still walking: an ethnographic study
2014-01-01
Background The delays in receiving adequate emergency maternal care described by Thaddeus and Maine twenty years ago are still occurring, as exemplified in this study of cases of maternal deaths in a subdistrict in rural eastern Indonesia. Methods An ethnographic design was conducted, recruiting eleven families who reported on cases of maternal deaths in one sub-district of Indonesia, as well as assessing the geographical and cultural context of the villages. Traditional birth attendants and village leaders provided information to the research team which was thematically and contextually analysed. Results Two stages to the first and second delays have been differentiated in this study. First, delays in the decision to seek care comprised time taken to recognise (if at all) that an emergency situation existed, followed by time taken to reach a decision to request care. The decision to request care resided variously with the family or cadre. Second, delays in reaching care comprised time taken to deliver the request for help and then time for help to arrive. A phone was not available to request care in many cases and so the request was delivered by walking or motorbike. In two cases where the decision to seek care and the delivery of the request happened in a timely way, help was delayed because the midwife and ambulance respectively were unavailable. Conclusions This study, although a small sample, confirmed that either a single delay or a sequence of delays can prove fatal. Delays were determined by both social and geographic factors, any of which alone could be limiting. Initiatives to improve maternal health outcomes need to address multiple factors: increased awareness of equitable access to maternal health care, village preparedness for emergency response, improved access to telecommunications and geographic access. PMID:24447873
NASA Astrophysics Data System (ADS)
Porras, Miguel A.
2018-06-01
We investigate the properties of the recently introduced time-diffracting (TD) beams in free space. They are shown to be paraxial and quasimonochromatic realizations of spatiotemporal localized waves traveling undistorted at arbitrary speeds. The paraxial and quasimonochromatic regime is shown to be necessary to observe what can properly be named diffraction in time. In this regime, the spatiotemporal frequency correlations for diffraction-free propagation are approximated by parabolic correlations. Time-diffracting beams of finite energy traveling at quasiluminal velocities are seen to form substantially longer foci or needles of light than the so-called abruptly focusing and defocusing needle of light or limiting TD beam of infinite speed. Exploring the properties of TD beams under Lorentz transformations and their transformation by paraxial optical systems, we realize that the nonlinear polarization of material media induced by a strongly localized fundamental pump wave generates a TD beam at its second harmonic, whose diffraction-free behavior as a needle of light in free space can be optimized with a standard 4 f -imager system.
Shen, Jiajian; Tryggestad, Erik; Younkin, James E; Keole, Sameer R; Furutani, Keith M; Kang, Yixiu; Herman, Michael G; Bues, Martin
2017-10-01
To accurately model the beam delivery time (BDT) for a synchrotron-based proton spot scanning system using experimentally determined beam parameters. A model to simulate the proton spot delivery sequences was constructed, and BDT was calculated by summing times for layer switch, spot switch, and spot delivery. Test plans were designed to isolate and quantify the relevant beam parameters in the operation cycle of the proton beam therapy delivery system. These parameters included the layer switch time, magnet preparation and verification time, average beam scanning speeds in x- and y-directions, proton spill rate, and maximum charge and maximum extraction time for each spill. The experimentally determined parameters, as well as the nominal values initially provided by the vendor, served as inputs to the model to predict BDTs for 602 clinical proton beam deliveries. The calculated BDTs (T BDT ) were compared with the BDTs recorded in the treatment delivery log files (T Log ): ∆t = T Log -T BDT . The experimentally determined average layer switch time for all 97 energies was 1.91 s (ranging from 1.9 to 2.0 s for beam energies from 71.3 to 228.8 MeV), average magnet preparation and verification time was 1.93 ms, the average scanning speeds were 5.9 m/s in x-direction and 19.3 m/s in y-direction, the proton spill rate was 8.7 MU/s, and the maximum proton charge available for one acceleration is 2.0 ± 0.4 nC. Some of the measured parameters differed from the nominal values provided by the vendor. The calculated BDTs using experimentally determined parameters matched the recorded BDTs of 602 beam deliveries (∆t = -0.49 ± 1.44 s), which were significantly more accurate than BDTs calculated using nominal timing parameters (∆t = -7.48 ± 6.97 s). An accurate model for BDT prediction was achieved by using the experimentally determined proton beam therapy delivery parameters, which may be useful in modeling the interplay effect and patient throughput. The model may provide guidance on how to effectively reduce BDT and may be used to identifying deteriorating machine performance. © 2017 American Association of Physicists in Medicine.
NASA Astrophysics Data System (ADS)
Gao, Guilong; Tian, Jinshou; Wang, Tao; He, Kai; Zhang, Chunmin; Zhang, Jun; Chen, Shaorong; Jia, Hui; Yuan, Fenfang; Liang, Lingliang; Yan, Xin; Li, Shaohui; Wang, Chao; Yin, Fei
2017-11-01
We report and experimentally demonstrate an ultrafast all-optical imaging technique capable of single-shot ultrafast recording with a picosecond-scale temporal resolution and a micron-order two-dimensional spatial resolution. A GaAs/AlxGa1 - xAs multiple-quantum-well (MQW) semiconductor with a picosecond response time, grown using molecular beam epitaxy (MBE) at a low temperature (LT), is used for the first time in ultrafast imaging technology. The semiconductor transforms the signal beam information to the probe beam, the birefringent delay crystal time-serializes the input probe beam, and the beam displacer maps different polarization probe beams onto different detector locations, resulting in two frames with an approximately 9 ps temporal separation and approximately 25 lp/mm spatial resolution in the visible range.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the time of the determination, to deduct up to 15%, or a greater amount if agreed to by the employee... procedures; (3) Establish time frames for employees to request a waiver in writing and for the bureau to review the waiver request. These time frames must take into consideration the responsibilities of the...
Code of Federal Regulations, 2010 CFR
2010-01-01
... file financial statements at the time of request for a draw. 108.1220 Section 108.1220 Business Credit... Nmvc Company § 108.1220 Requirement for NMVC Company to file financial statements at the time of... financial statement on Form 468 (Short Form); and (2) File a statement of no material adverse change in your...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-28
... OFFICE OF PERSONNEL MANAGEMENT Submission for Review: It's Time to Sign Up for Direct Deposit or Direct Express, RI 38-128 AGENCY: U.S. Office of Personnel Management. ACTION: 30-Day Notice and request... request (ICR) 3206-0226, It's Time to Sign Up for Direct Deposit or Direct Express. As required by the...
Readiness of the ATLAS detector: Performance with the first beam and cosmic data
NASA Astrophysics Data System (ADS)
Pastore, F.
2010-05-01
During 2008 the ATLAS experiment went through an intense period of preparation to have the detector fully commissioned for the first beam period. In about 30 h of beam time available to ATLAS in 2008 the systems went through a rapid setup sequence, from successfully recording the first bunch ever reaching ATLAS, to setting up the timing of the trigger system synchronous to the incoming single beams. The so-called splash events were recorded, where the beam was stopped on a collimator 140 m upstream of ATLAS, showering the experiment with millions of particles per beam shot. These events were found to be extremely useful for timing setup. After the stop of the beam operation, the experiment went through an extensive cosmic ray data taking campaign, recording more than 500 million cosmic ray events. These events have been used to make significant progress on the calibration and alignment of the detector. This paper describes the commissioning programme and the results obtained from both the single beam data and the cosmic data recorded in 2008.
McLeod, Euan; Arnold, Craig B
2008-07-10
Current methods for generating Bessel beams are limited to fixed beam sizes or, in the case of conventional adaptive optics, relatively long switching times between beam shapes. We analyze the multiscale Bessel beams created using an alternative rapidly switchable device: a tunable acoustic gradient index (TAG) lens. The shape of the beams and their nondiffracting, self-healing characteristics are studied experimentally and explained theoretically using both geometric and Fourier optics. By adjusting the electrical driving signal, we can tune the ring spacings, the size of the central spot, and the working distance of the lens. The results presented here will enable researchers to employ dynamic Bessel beams generated by TAG lenses.
Method and apparatus for real time imaging and monitoring of radiotherapy beams
Majewski, Stanislaw [Yorktown, VA; Proffitt, James [Newport News, VA; Macey, Daniel J [Birmingham, AL; Weisenberger, Andrew G [Yorktown, VA
2011-11-01
A method and apparatus for real time imaging and monitoring of radiation therapy beams is designed to preferentially distinguish and image low energy radiation from high energy secondary radiation emitted from a target as the result of therapeutic beam deposition. A detector having low sensitivity to high energy photons combined with a collimator designed to dynamically image in the region of the therapeutic beam target is used.
NASA Technical Reports Server (NTRS)
Chap, Andrew; Tarditi, Alfonso G.; Scott, John H.
2013-01-01
A Particle-in-cell simulation model has been developed to study the physics of the Traveling Wave Direct Energy Converter (TWDEC) applied to the conversion of charged fusion products into electricity. In this model the availability of a beam of collimated fusion products is assumed; the simulation is focused on the conversion of the beam kinetic energy into alternating current (AC) electric power. The model is electrostatic, as the electro-dynamics of the relatively slow ions can be treated in the quasistatic approximation. A two-dimensional, axisymmetric (radial-axial coordinates) geometry is considered. Ion beam particles are injected on one end and travel along the axis through ring-shaped electrodes with externally applied time-varying voltages, thus modulating the beam by forming a sinusoidal pattern in the beam density. Further downstream, the modulated beam passes through another set of ring electrodes, now electrically oating. The modulated beam induces a time alternating potential di erence between adjacent electrodes. Power can be drawn from the electrodes by connecting a resistive load. As energy is dissipated in the load, a corresponding drop in beam energy is measured. The simulation encapsulates the TWDEC process by reproducing the time-dependent transfer of energy and the particle deceleration due to the electric eld phase time variations.
42 CFR 417.151 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... PREPAYMENT PLANS Inclusion of Qualified Health Maintenance Organizations in Employee Health Benefits Plans... least one qualified HMO a written request for inclusion and that request met the timing, content, and...
42 CFR 417.151 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... PREPAYMENT PLANS Inclusion of Qualified Health Maintenance Organizations in Employee Health Benefits Plans... least one qualified HMO a written request for inclusion and that request met the timing, content, and...
42 CFR 417.151 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-10-01
... PREPAYMENT PLANS Inclusion of Qualified Health Maintenance Organizations in Employee Health Benefits Plans... least one qualified HMO a written request for inclusion and that request met the timing, content, and...
42 CFR 417.151 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PLANS Inclusion of Qualified Health Maintenance Organizations in Employee Health Benefits Plans § 417... qualified HMO a written request for inclusion and that request met the timing, content, and procedural...
42 CFR 417.151 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PLANS Inclusion of Qualified Health Maintenance Organizations in Employee Health Benefits Plans § 417... qualified HMO a written request for inclusion and that request met the timing, content, and procedural...
Linear time-to-space mapping system using double electrooptic beam deflectors.
Hisatake, Shintaro; Tada, Keiji; Nagatsuma, Tadao
2008-12-22
We propose and demonstrate a linear time-to-space mapping system, which is based on two times electrooptic sinusoidal beam deflection. The direction of each deflection is set to be mutually orthogonal with the relative deflection phase of pi/2 rad so that the circular optical beam trajectory can be achieved. The beam spot at the observation plane moves with an uniform velocity and as a result linear time-to-space mapping (an uniform temporal resolution through the mapping) can be realized. The proof-of-concept experiment are carried out and the temporal resolution of 5 ps has been demonstrated using traveling-wave type quasi-velosity-matched electrooptic beam deflectors. The developed system is expected to be applied to characterization of ultrafast optical signal or optical arbitrary waveform shaping for modulated microwave/millimeter-wave generation.
Request-Driven Schedule Automation for the Deep Space Network
NASA Technical Reports Server (NTRS)
Johnston, Mark D.; Tran, Daniel; Arroyo, Belinda; Call, Jared; Mercado, Marisol
2010-01-01
The DSN Scheduling Engine (DSE) has been developed to increase the level of automated scheduling support available to users of NASA s Deep Space Network (DSN). We have adopted a request-driven approach to DSN scheduling, in contrast to the activity-oriented approach used up to now. Scheduling requests allow users to declaratively specify patterns and conditions on their DSN service allocations, including timing, resource requirements, gaps, overlaps, time linkages among services, repetition, priorities, and a wide range of additional factors and preferences. The DSE incorporates a model of the key constraints and preferences of the DSN scheduling domain, along with algorithms to expand scheduling requests into valid resource allocations, to resolve schedule conflicts, and to repair unsatisfied requests. We use time-bounded systematic search with constraint relaxation to return nearby solutions if exact ones cannot be found, where the relaxation options and order are under user control. To explore the usability aspects of our approach we have developed a graphical user interface incorporating some crucial features to make it easier to work with complex scheduling requests. Among these are: progressive revelation of relevant detail, immediate propagation and visual feedback from a user s decisions, and a meeting calendar metaphor for repeated patterns of requests. Even as a prototype, the DSE has been deployed and adopted as the initial step in building the operational DSN schedule, thus representing an important initial validation of our overall approach. The DSE is a core element of the DSN Service Scheduling Software (S(sup 3)), a web-based collaborative scheduling system now under development for deployment to all DSN users.
Tinegate, H N; Davies, T; Elshaw, R J; Jane, G; Lyon, M; Norfolk, D R; Plews, D E; Troy, C B; Watson, D
2010-08-01
This study was undertaken to provide data relating to the timing of laboratory crossmatch procedures, and the source of requests for out of hours crossmatch, to support interpretation of error reports originating in the transfusion laboratory, received by the Serious Hazards of Transfusion haemovigilance scheme. Data on the timing, origin and urgency of all crossmatch requests were collected in 34 hospitals in northern England over a 7-day period in 2008. Additional data on clinical urgency were collected on crossmatches that were performed out of hours. Data were obtained on 2423 crossmatches, including 610 (25.2%) performed outside core hours. 30.3% of out of hours crossmatch requests were for transfusions that were set up outside 4 h of completion of the crossmatch. 2008 Serious Hazards of Transfusion data showed that 29/39 (74%) of laboratory errors resulting in 'wrong blood' occurred out of hours whilst our audit shows that only 25% of crossmatch requests are made in that time period, suggesting that crossmatching performed outside core hours carries increased risks. The reason for increased risk of error needs further research, but 25 laboratories had only one member of staff working out of hours, often combining blood transfusion, haematology and coagulation work. A total of 25% of out of hours requests were not clinically urgent. Hospitals should develop policies to define indications for out of hours transfusion testing, empower laboratory staff to challenge inappropriate requests and ensure that staffing and expertise is appropriate for the workload at all times.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-08
... provides that a registrant of a pesticide product may at any time request that any of its pesticide..., because the registrants requested a waiver of the 180-day comment period. Users of these products who...://www.epa.gov/dockets . FOR FURTHER INFORMATION CONTACT: Christopher Green, Information Technology and...
33 CFR 117.35 - Temporary change to a drawbridge operating schedule.
Code of Federal Regulations, 2010 CFR
2010-07-01
... District Commander for approval of the change. (2) The request must describe the reason for the closure and... receipt of the request. If the request is denied, the reasons for the denial will be set out in the... broken into separate time periods on the same day or on consecutive days, the drawbridge must provide...
Parents' Agreement to Purchase Healthy Snack Foods Requested by Their Children
ERIC Educational Resources Information Center
Carson, Diane E.; Reiboldt, Wendy
2010-01-01
Research shows that parents agree to purchase their children's food requests 45% to 65% of the time. This study examined an after-school nutrition education intervention in terms of its effects on parents' agreement to purchase healthy snack foods requested by their children. Survey data from 755 parents were analyzed. Of the 67% of parents asked…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-08
... Arsenic Rule which will provide for better public health protection by lowering the maximum contaminant... interested parties are invited to submit written comments on this determination and may request a public... determination shall become effective on November 8, 2010 if no timely and appropriate request for a hearing is...
Requesting Accommodation for a Disability: A Telephone Survey of American Medical Schools
ERIC Educational Resources Information Center
Sack, William; Gale, John; Gulati, Sanjay; Gunther, Michael; Nesheim, Robert; Stoddard, Frederick; St. John, Rachel
2008-01-01
Members of the committee on disabilities of the Group for the Advancement of Psychiatry (GAP) contacted 107 of 126 American Medical Schools to determine the number of students requesting accommodation for a disability, the time at which the request was made, the type of disability, and the type of accommodation offered. The survey determined that…
25 CFR 171.200 - How do I request irrigation service from the BIA?
Code of Federal Regulations, 2011 CFR
2011-04-01
... Section 171.200 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION...) You must request service from the irrigation facility servicing your farm unit. (b) Your request must... time and date you want service to start; (4) How long you want service; (5) The rate of water flow you...
25 CFR 171.200 - How do I request irrigation service from the BIA?
Code of Federal Regulations, 2010 CFR
2010-04-01
... Section 171.200 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION...) You must request service from the irrigation facility servicing your farm unit. (b) Your request must... time and date you want service to start; (4) How long you want service; (5) The rate of water flow you...
20 CFR 416.1595 - When the Appeals Council will dismiss a request for review.
Code of Federal Regulations, 2010 CFR
2010-04-01
... SUPPLEMENTAL SECURITY INCOME FOR THE AGED, BLIND, AND DISABLED Representation of Parties § 416.1595 When the... dismissal. (b) Death of party. The Appeals Council may dismiss a request for review in the event of the death of the representative. (c) Request for review not timely filed. The Appeals Council will dismiss a...
45 CFR 2507.8 - How are fees determined?
Code of Federal Regulations, 2010 CFR
2010-10-01
... assessable charges are likely to exceed $250.00, and the requester has no history of payment of FOIA fees. (Where the requester has a history of prompt payment of fees, the Corporation shall notify the requester... failed to pay a FOIA fee charged in a timely fashion (i.e., within 30 days of the date of the billing...
10 CFR 1004.9 - Fees for providing records.
Code of Federal Regulations, 2010 CFR
2010-01-01
... full payment where the requester has a history of prompt payment of FOIA fees, or require an advance payment of an amount up to the full estimated charges in the case of requesters with no history of payment. (ii) A requester has previously failed to pay a fee in a timely fashion (i.e., within 30 days of the...
11 CFR 9405.11 - Miscellaneous fee provisions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... where the requester has a history of prompt payment of FOIA fees or require an advance payment of an amount up to the full estimated charges in the case of requesters with no history of payment; or (2) A requester has previously failed to pay a fee charged in a timely fashion (i.e., within 30 days of the date...
14 CFR 1206.704 - Advance payments.
Code of Federal Regulations, 2010 CFR
2010-01-01
... where the requester has a history of prompt payment of FOIA fees, or require an advance payment of an amount up to the full estimated charges in the case of requesters with no history of payment; or (2) A requester has previously failed to pay a fee in a timely fashion (within 30 days of billing), then NASA may...
36 CFR 404.9 - Miscellaneous fee provisions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... likely cost and obtain satisfactory assurance of full payment where the requester has a history of prompt... case of requesters with no history of payment; or (2) A requester has previously failed to pay a fee charged in a timely fashion (i.e., within 30 days of the date of the billing). Then, ABMC may require the...
24 CFR 2002.15 - Advance payments.
Code of Federal Regulations, 2010 CFR
2010-04-01
... where the requester has a history of prompt payment of FOIA fees, or require an advance payment of an amount up to the full estimated charges in the case of requesters with no history of payment; or (2) Where a requester has previously failed to pay a fee charged in a timely fashion (i.e., within 30 days...
36 CFR 1008.21 - Petitions for amendment: Time limits for processing.
Code of Federal Regulations, 2010 CFR
2010-07-01
... assistance and views are being sought in processing the request. (2) If the official responsible for making a... limits for processing. 1008.21 Section 1008.21 Parks, Forests, and Public Property PRESIDIO TRUST REQUESTS UNDER THE PRIVACY ACT § 1008.21 Petitions for amendment: Time limits for processing. (a...
Code of Federal Regulations, 2010 CFR
2010-04-01
... deposition of a witness shall give the other parties reasonable notice of the time and place of the deposition and of the identity of the witness. (b) Availability. Upon request of the Board or upon request of... notifying their witnesses and for arranging for their appearance at the time and place set for the hearing...
45 CFR 1705.4 - Times, places, and requirements for identification of individuals making requests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false Times, places, and requirements for identification of individuals making requests. 1705.4 Section 1705.4 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL COMMISSION ON LIBRARIES AND INFORMATION SCIENCE PRIVACY REGULATIONS § 1705.4...
45 CFR 1705.4 - Times, places, and requirements for identification of individuals making requests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Times, places, and requirements for identification of individuals making requests. 1705.4 Section 1705.4 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL COMMISSION ON LIBRARIES AND INFORMATION SCIENCE PRIVACY REGULATIONS § 1705.4...
45 CFR 1705.4 - Times, places, and requirements for identification of individuals making requests.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 4 2013-10-01 2013-10-01 false Times, places, and requirements for identification of individuals making requests. 1705.4 Section 1705.4 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL COMMISSION ON LIBRARIES AND INFORMATION SCIENCE PRIVACY REGULATIONS § 1705.4...
45 CFR 1705.4 - Times, places, and requirements for identification of individuals making requests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 45 Public Welfare 4 2012-10-01 2012-10-01 false Times, places, and requirements for identification of individuals making requests. 1705.4 Section 1705.4 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL COMMISSION ON LIBRARIES AND INFORMATION SCIENCE PRIVACY REGULATIONS § 1705.4...
45 CFR 1705.4 - Times, places, and requirements for identification of individuals making requests.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 4 2014-10-01 2014-10-01 false Times, places, and requirements for identification of individuals making requests. 1705.4 Section 1705.4 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL COMMISSION ON LIBRARIES AND INFORMATION SCIENCE PRIVACY REGULATIONS § 1705.4...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-11
... FDCHs during the time period(s) for which the meals/snacks were claimed. Generate the data required for... visits to FDCHs during scheduled meal times. Based on the findings from the feasibility evaluation, FNS...: Proposed Collection; Comment Request--Child and Adult Care Food Program Improper Payments Meal Claims...
37 CFR 102.6 - Time limits and expedited processing.
Code of Federal Regulations, 2010 CFR
2010-07-01
... requests. Refusal to reasonably modify the scope of a request or arrange an alternate time frame may affect... imminent threat to the life or physical safety of an individual; (ii) The loss of substantial due process... the Government's integrity that affect public confidence; or (iv) An urgency to inform the public...
Code of Federal Regulations, 2010 CFR
2010-07-01
... denied; (4) A request has not been decided within the time limits provided in § 1007.6; or (5) A request for expedited processing under § 1007.5(d) has been denied. (b) Time for appeal. An appeal must be..., both the envelope containing a notice of appeal and the face of the notice should bear the legend...
78 FR 69456 - Notice To Reinstate a Previously Approved Information Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-19
... incident occurred on approach, takeoff, or within 3 miles of an airport); ``flight crew member 1... requests information concerning the location and date and time of the accident or incident, the phase of... last inspection, total time on airframe, type of fire extinguishing system, type of reciprocating fuel...
31 CFR 344.3 - What provisions apply to the SLGSafe Service?
Code of Federal Regulations, 2011 CFR
2011-07-01
... documents, which may be downloaded from BPD's Web site and which may change from time to time, apply to... and other transaction requests exclusively through SLGSafe, except to the extent you establish to the satisfaction of BPD that good cause exists for you to submit such subscriptions and requests by other means...
18 CFR 701.204 - Time limits for WRC initial determinations regarding requests for information.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Time limits for WRC initial determinations regarding requests for information. 701.204 Section 701.204 Conservation of Power and Water Resources WATER RESOURCES COUNCIL COUNCIL ORGANIZATION Availability of Information § 701.204...
18 CFR 701.204 - Time limits for WRC initial determinations regarding requests for information.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Time limits for WRC initial determinations regarding requests for information. 701.204 Section 701.204 Conservation of Power and Water Resources WATER RESOURCES COUNCIL COUNCIL ORGANIZATION Availability of Information § 701.204...
18 CFR 701.204 - Time limits for WRC initial determinations regarding requests for information.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Time limits for WRC initial determinations regarding requests for information. 701.204 Section 701.204 Conservation of Power and Water Resources WATER RESOURCES COUNCIL COUNCIL ORGANIZATION Availability of Information § 701.204...
18 CFR 701.204 - Time limits for WRC initial determinations regarding requests for information.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Time limits for WRC initial determinations regarding requests for information. 701.204 Section 701.204 Conservation of Power and Water Resources WATER RESOURCES COUNCIL COUNCIL ORGANIZATION Availability of Information § 701.204...
18 CFR 701.204 - Time limits for WRC initial determinations regarding requests for information.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Time limits for WRC initial determinations regarding requests for information. 701.204 Section 701.204 Conservation of Power and Water Resources WATER RESOURCES COUNCIL COUNCIL ORGANIZATION Availability of Information § 701.204...
45 CFR 612.5 - Timing of responses to requests.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 3 2014-10-01 2014-10-01 false Timing of responses to requests. 612.5 Section 612.5 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION... expected to pose an imminent threat to the life or physical safety of an individual; or (B) An urgency to...
21 CFR 511.1 - New animal drugs for investigational use exempt from section 512(a) of the act.
Code of Federal Regulations, 2010 CFR
2010-04-01
... request of a properly authorized employee of the Department at reasonable times, he shall make such... delivery. Upon the request of a properly authorized employee of the Department at reasonable times, such... pertinent information includes nonclinical laboratory studies, the information shall include, with respect...
21 CFR 511.1 - New animal drugs for investigational use exempt from section 512(a) of the act.
Code of Federal Regulations, 2012 CFR
2012-04-01
... request of a properly authorized employee of the Department at reasonable times, he shall make such... delivery. Upon the request of a properly authorized employee of the Department at reasonable times, such... pertinent information includes nonclinical laboratory studies, the information shall include, with respect...
21 CFR 511.1 - New animal drugs for investigational use exempt from section 512(a) of the act.
Code of Federal Regulations, 2011 CFR
2011-04-01
... request of a properly authorized employee of the Department at reasonable times, he shall make such... delivery. Upon the request of a properly authorized employee of the Department at reasonable times, such... pertinent information includes nonclinical laboratory studies, the information shall include, with respect...
76 FR 28246 - Information Collection Requests Under OMB Review
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-16
... collection request to the Office of Management and Budget (OMB) for approval of an existing collection in use... characteristics and skills to serve as a Peace Corps Response Volunteer. OMB Control Number: 0420-pending. Title... of reference forms received: 1,000. e. Frequency of response: One time. f. Estimated average time to...
Web Transfer Over Satellites Being Improved
NASA Technical Reports Server (NTRS)
Allman, Mark
1999-01-01
Extensive research conducted by NASA Lewis Research Center's Satellite Networks and Architectures Branch and the Ohio University has demonstrated performance improvements in World Wide Web transfers over satellite-based networks. The use of a new version of the Hypertext Transfer Protocol (HTTP) reduced the time required to load web pages over a single Transmission Control Protocol (TCP) connection traversing a satellite channel. However, an older technique of simultaneously making multiple requests of a given server has been shown to provide even faster transfer time. Unfortunately, the use of multiple simultaneous requests has been shown to be harmful to the network in general. Therefore, we are developing new mechanisms for the HTTP protocol which may allow a single request at any given time to perform as well as, or better than, multiple simultaneous requests. In the course of study, we also demonstrated that the time for web pages to load is at least as short via a satellite link as it is via a standard 28.8-kbps dialup modem channel. This demonstrates that satellites are a viable means of accessing the Internet.
Theory of electronically phased coherent beam combination without a reference beam
NASA Astrophysics Data System (ADS)
Shay, Thomas M.
2006-12-01
The first theory for two novel coherent beam combination architectures that are the first electronic beam combination architectures that completely eliminate the need for a separate reference beam are presented. Detailed theoretical models are developed and presented for the first time.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Leung Shingyu, E-mail: masyleung@ust.h; Qian Jianliang, E-mail: qian@math.msu.ed
2010-11-20
We propose the backward phase flow method to implement the Fourier-Bros-Iagolnitzer (FBI)-transform-based Eulerian Gaussian beam method for solving the Schroedinger equation in the semi-classical regime. The idea of Eulerian Gaussian beams has been first proposed in . In this paper we aim at two crucial computational issues of the Eulerian Gaussian beam method: how to carry out long-time beam propagation and how to compute beam ingredients rapidly in phase space. By virtue of the FBI transform, we address the first issue by introducing the reinitialization strategy into the Eulerian Gaussian beam framework. Essentially we reinitialize beam propagation by applying themore » FBI transform to wavefields at intermediate time steps when the beams become too wide. To address the second issue, inspired by the original phase flow method, we propose the backward phase flow method which allows us to compute beam ingredients rapidly. Numerical examples demonstrate the efficiency and accuracy of the proposed algorithms.« less
The backward phase flow and FBI-transform-based Eulerian Gaussian beams for the Schrödinger equation
NASA Astrophysics Data System (ADS)
Leung, Shingyu; Qian, Jianliang
2010-11-01
We propose the backward phase flow method to implement the Fourier-Bros-Iagolnitzer (FBI)-transform-based Eulerian Gaussian beam method for solving the Schrödinger equation in the semi-classical regime. The idea of Eulerian Gaussian beams has been first proposed in [12]. In this paper we aim at two crucial computational issues of the Eulerian Gaussian beam method: how to carry out long-time beam propagation and how to compute beam ingredients rapidly in phase space. By virtue of the FBI transform, we address the first issue by introducing the reinitialization strategy into the Eulerian Gaussian beam framework. Essentially we reinitialize beam propagation by applying the FBI transform to wavefields at intermediate time steps when the beams become too wide. To address the second issue, inspired by the original phase flow method, we propose the backward phase flow method which allows us to compute beam ingredients rapidly. Numerical examples demonstrate the efficiency and accuracy of the proposed algorithms.
Coexistence of WiFi and WiMAX systems based on PS-request protocols.
Kim, Jongwoo; Park, Suwon; Rhee, Seung Hyong; Choi, Yong-Hoon; Chung, Young-uk; Hwang, Ho Young
2011-01-01
We introduce both the coexistence zone within the WiMAX frame structure and a PS-Request protocol for the coexistence of WiFi and WiMAX systems sharing a frequency band. Because we know that the PS-Request protocol has drawbacks, we propose a revised PS-Request protocol to improve the performance. Two PS-Request protocols are based on the time division operation (TDO) of WiFi system and WiMAX system to avoid the mutual interference, and use the vestigial power management (PwrMgt) bit within the Frame Control field of the frames transmitted by a WiFi AP. The performance of the revised PS-Request protocol is evaluated by computer simulation, and compared to those of the cases without a coexistence protocol and to the original PS-Request protocol.
Data transmission system with distributed microprocessors
Nambu, Shigeo
1985-01-01
A data transmission system having a common request line and a special request line in addition to a transmission line. The special request line has priority over the common request line. A plurality of node stations are multi-drop connected to the transmission line. Among the node stations, a supervising station is connected to the special request line and takes precedence over other slave stations to become a master station. The master station collects data from the slave stations. The station connected to the common request line can assign a master control function to any station requesting to be assigned the master control function within a short period of time. Each station has an auto response control circuit. The master station automatically collects data by the auto response controlling circuit independently of the microprocessors of the slave stations.
Coexistence of WiFi and WiMAX Systems Based on PS-Request Protocols†
Kim, Jongwoo; Park, Suwon; Rhee, Seung Hyong; Choi, Yong-Hoon; Chung, Young-uk; Hwang, Ho Young
2011-01-01
We introduce both the coexistence zone within the WiMAX frame structure and a PS-Request protocol for the coexistence of WiFi and WiMAX systems sharing a frequency band. Because we know that the PS-Request protocol has drawbacks, we propose a revised PS-Request protocol to improve the performance. Two PS-Request protocols are based on the time division operation (TDO) of WiFi system and WiMAX system to avoid the mutual interference, and use the vestigial power management (PwrMgt) bit within the Frame Control field of the frames transmitted by a WiFi AP. The performance of the revised PS-Request protocol is evaluated by computer simulation, and compared to those of the cases without a coexistence protocol and to the original PS-Request protocol. PMID:22163721
2011-08-01
concrete box beams . Each pier is constructed of two drilled shafts with cast-in-place concrete cap beams to support the precast concrete wall beams ...and nose cell. The hollow, rectangular beams have an outside dimension of 10 feet by 10 feet. The weight of each of the precast beams is...a concrete-filled sheet-pile nose cell, which support five precast concrete beams . An example of this flexible impact beam is shown in Figures 1.5
Interferometer with Continuously Varying Path Length Measured in Wavelengths to the Reference Mirror
NASA Technical Reports Server (NTRS)
Ohara, Tetsuo (Inventor)
2016-01-01
An interferometer in which the path length of the reference beam, measured in wavelengths, is continuously changing in sinusoidal fashion and the interference signal created by combining the measurement beam and the reference beam is processed in real time to obtain the physical distance along the measurement beam between the measured surface and a spatial reference frame such as the beam splitter. The processing involves analyzing the Fourier series of the intensity signal at one or more optical detectors in real time and using the time-domain multi-frequency harmonic signals to extract the phase information independently at each pixel position of one or more optical detectors and converting the phase information to distance information.
Beam-return current systems in solar flares
NASA Technical Reports Server (NTRS)
Spicer, D. S.; Sudan, R. N.
1984-01-01
It is demonstrated that the common assumption made in solar flare beam transport theory that the beam-accompanied return current is purely electrostatically driven is incorrect, and that the return current is both electrostatically and inductively driven, in accordance with Lenz's law, with the inductive effects dominating for times greater than a few plasma periods. In addition, it is shown that a beam can only exist in a solar plasma for a finite time which is much smaller than the inductive return current dissipation time. The importance of accounting for the role of the acceleration mechanism in forming the beam is discussed. In addition, the role of return current driven anomalous resistivity and its subsequent anomalous Joule heating during the flare process is elucidated.
NSUF Ion Beam Investment Options Workshop Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heidrich, Brenden John
2016-03-01
The workshop that generated this data was convened to develop a set of recommendations (a priority list) for possible funding in the area of US domestic ion beam irradiation capabilities for nuclear energy-focused RD&D. The results of this workshop were intended for use by the Department of Energy - Office of Nuclear Energy (DOE-NE) for consideration of support for these facilities. The workshop considered, as part of the initial potential future support discussions, input submitted through the Office of Nuclear Energy Request for Information (RFI) (DE-SOL-0008318, April 13, 2015), but welcomed discussion (and presentation) of other options, whether specific ormore » general in scope. Input from users, including DOE-NE program interests and needs for ion irradiation RD&D were also included. Participants were selected from various sources: RFI respondents, NEUP/NEET infrastructure applicants, universities with known expertise in nuclear engineering and materials science and other developed sources. During the three days from March 22-24, 2016, the workshop was held at the Idaho National Laboratory Meeting Center in the Energy Innovation Laboratory at 775 University Drive, Idaho Falls, ID 83401. Thirty-one members of the ion beam community attended the workshop, including 15 ion beam facilities, six representatives of Office of Nuclear Energy R&D programs, an industry representative from EPRI and the chairs of the NSUF User’s Organization and the NSUF Scientific Review Board. Another four ion beam users were in attendance acting as advisors to the process, but did not participate in the options assessment. Three members of the sponsoring agency, the Office of Science and Technology Innovation (NE-4) also attended the workshop.« less
End-to-End Network QoS via Scheduling of Flexible Resource Reservation Requests
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sharma, S.; Katramatos, D.; Yu, D.
2011-11-14
Modern data-intensive applications move vast amounts of data between multiple locations around the world. To enable predictable and reliable data transfer, next generation networks allow such applications to reserve network resources for exclusive use. In this paper, we solve an important problem (called SMR3) to accommodate multiple and concurrent network reservation requests between a pair of end-sites. Given the varying availability of bandwidth within the network, our goal is to accommodate as many reservation requests as possible while minimizing the total time needed to complete the data transfers. We first prove that SMR3 is an NP-hard problem. Then we solvemore » it by developing a polynomial-time heuristic, called RRA. The RRA algorithm hinges on an efficient mechanism to accommodate large number of requests by minimizing the bandwidth wastage. Finally, via numerical results, we show that RRA constructs schedules that accommodate significantly larger number of requests compared to other, seemingly efficient, heuristics.« less
Ellington, Chris; Grgurinovich, Nick; Miners, John O; Mangoni, Arduino A
2007-05-01
* Therapeutic drug monitoring of serum digoxin concentrations (SDC) is considered useful in enhancing the therapeutic benefits of digoxin and minimizing the incidence of adverse drug reactions. * The quality of requests for SDC has been reported to be generally unsatisfactory. However, studies have focused on few information parameters. * A better knowledge of these issues might be useful to target appropriate areas of weakness within heathcare systems. * The poor quality of the information in SDC requests involves a wide range of codes from the contact details of the requester to the time interval between the last dose of digoxin and blood sampling. * Misuse of the therapeutic drug monitoring service is common across different specialties and healthcare settings. To assess the quality of the information provided with serum digoxin concentration (SDC) requests received by a therapeutic drug monitoring service in a regional health service. We conducted a retrospective audit of a consecutive series of 685 SDC requests during a 7-month period. Information regarding (i) contact details, (ii) reasons for request, (iii) dose, (iv) route of administration, (v) concurrent therapy, (vi) treatment duration and (vii) time interval between the last dose and sampling was reviewed and coded as appropriate or inappropriate/missing. Data were analysed according to the origin of request, i.e. from different specialties/wards (emergency department and critical care, cardiology and coronary care unit, medicine and aged care, surgery, and general/private practice) and healthcare settings (teaching hospital, geriatric hospital and general/private practice). The quality of SDC requests was generally poor across different specialties and healthcare settings. The information provided for the coded parameters was appropriate only in 19.1% (i), 6.4% (ii), 54.7% (iii), 45.8% (iv), 12.8% (v), 32.9% (vi) and 47.1% (vii) of cases. No SDC request was complete in all the information codes. SDC requests from general/private practice lacked more often details regarding the dose (information provided in 46.7% of requests, P = 0.007 vs. other specialties; P = 0.02 vs. other settings) and the route of administration (20.0%, P < 0.001 vs. other specialties and vs. other settings). SDC requests from the emergency department and critical care unit lacked more often details regarding the treatment duration (22.6%, P < 0.001 vs. other specialties) and the time interval between the last dose and blood sampling (40.1%, P = 0.01 vs. other specialties). The quality of the information in SDC requests is poor across different specialties and healthcare settings. Educational strategies to ensure the appropriate use of this service are urgently needed.
Ellington, Chris; Grgurinovich, Nick; Miners, John O; Mangoni, Arduino A
2007-01-01
What is already known about this subject Therapeutic drug monitoring of serum digoxin concentrations (SDC) is considered useful in enhancing the therapeutic benefits of digoxin and minimizing the incidence of adverse drug reactions. The quality of requests for SDC has been reported to be generally unsatisfactory. However, studies have focused on few information parameters. A better knowledge of these issues might be useful to target appropriate areas of weakness within heathcare systems. What this study adds The poor quality of the information in SDC requests involves a wide range of codes from the contact details of the requester to the time interval between the last dose of digoxin and blood sampling. Misuse of the therapeutic drug monitoring service is common across different specialties and healthcare settings. Aims To assess the quality of the information provided with serum digoxin concentration (SDC) requests received by a therapeutic drug monitoring service in a regional health service. Methods We conducted a retrospective audit of a consecutive series of 685 SDC requests during a 7-month period. Information regarding (i) contact details, (ii) reasons for request, (iii) dose, (iv) route of administration, (v) concurrent therapy, (vi) treatment duration and (vii) time interval between the last dose and sampling was reviewed and coded as appropriate or inappropriate/missing. Data were analysed according to the origin of request, i.e. from different specialties/wards (emergency department and critical care, cardiology and coronary care unit, medicine and aged care, surgery, and general/private practice) and healthcare settings (teaching hospital, geriatric hospital and general/private practice). Results The quality of SDC requests was generally poor across different specialties and healthcare settings. The information provided for the coded parameters was appropriate only in 19.1% (i), 6.4% (ii), 54.7% (iii), 45.8% (iv), 12.8% (v), 32.9% (vi) and 47.1% (vii) of cases. No SDC request was complete in all the information codes. SDC requests from general/private practice lacked more often details regarding the dose (information provided in 46.7% of requests, P = 0.007 vs. other specialties; P = 0.02 vs. other settings) and the route of administration (20.0%, P < 0.001 vs. other specialties and vs. other settings). SDC requests from the emergency department and critical care unit lacked more often details regarding the treatment duration (22.6%, P < 0.001 vs. other specialties) and the time interval between the last dose and blood sampling (40.1%, P = 0.01 vs. other specialties). Conclusions The quality of the information in SDC requests is poor across different specialties and healthcare settings. Educational strategies to ensure the appropriate use of this service are urgently needed. PMID:17073890
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rossi, Linda, E-mail: l.rossi@erasmusmc.nl; Breedveld, Sebastiaan; Aluwini, Shafak
Purpose: To investigate development of a recipe for the creation of a beam angle class solution (CS) for noncoplanar prostate stereotactic body radiation therapy to replace time-consuming individualized beam angle selection (iBAS) without significant loss in plan quality, using the in-house “Erasmus-iCycle” optimizer for fully automated beam profile optimization and iBAS. Methods and Materials: For 30 patients, Erasmus-iCycle was first used to generate 15-, 20-, and 25-beam iBAS plans for a CyberKnife equipped with a multileaf collimator. With these plans, 6 recipes for creation of beam angle CSs were investigated. Plans of 10 patients were used to create CSs based on themore » recipes, and the other 20 to independently test them. For these tests, Erasmus-iCycle was also used to generate intensity modulated radiation therapy plans for the fixed CS beam setups. Results: Of the tested recipes for CS creation, only 1 resulted in 15-, 20-, and 25-beam noncoplanar CSs without plan deterioration compared with iBAS. For the patient group, mean differences in rectum D{sub 1cc}, V{sub 60GyEq}, V{sub 40GyEq}, and D{sub mean} between 25-beam CS plans and 25-beam plans generated with iBAS were 0.2 ± 0.4 Gy, 0.1% ± 0.2%, 0.2% ± 0.3%, and 0.1 ± 0.2 Gy, respectively. Differences between 15- and 20-beam CS and iBAS plans were also negligible. Plan quality for CS plans relative to iBAS plans was also preserved when narrower planning target volume margins were arranged and when planning target volume dose inhomogeneity was decreased. Using a CS instead of iBAS reduced the computation time by a factor of 14 to 25, mainly depending on beam number, without loss in plan quality. Conclusions: A recipe for creation of robust beam angle CSs for robotic prostate stereotactic body radiation therapy has been developed. Compared with iBAS, computation times decreased by a factor 14 to 25. The use of a CS may avoid long planning times without losses in plan quality.« less
Force Time History During the Impact of a Barge Train with a Lock Approach Wall Using Impact_Force
2010-06-01
anthracite coal and a simply supported, long-span precast impact beam allows for an evaluation of the conserva- tiveness of the simplified Equation...is a precast , prestressed hollow beam (i.e., flexible structure) with a length of 117 feet 7 3/4 inches. A cross-section of the hollow beam is shown...XGlobal mbarge train Flexible Approach wall Flexible Beam deformation at time t time (secs) F n or m al -w al l (k ip s) 0 0.5 1 1.5 2 2.5 3 3.5 4 0
Wang, Jian; Hou, Peipei; Cai, Haiwen; Sun, Jianfeng; Wang, Shunan; Wang, Lijuan; Yang, Fei
2015-04-06
We propose an optically controlled phased array antenna (PAA) based on differential true time delay constructed optical beamforming network (OBFN). Differential true time delay is realized by stack integrated micro-optical components. Optically-controlled angle steering of radio frequency (RF) beams are realized and demonstrated by this configuration. Experimental results demonstrate that OBFN based PAA can accomplish RF-independent broadband beam steering without beam squint effect and can achieve continuous angle steering. In addition, multi-beams for different steering angles are acquired synchronously.
Design of a low-cost, compact SRF accelerator for flue gas and wastewater treatment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ciovati, Gianluigi
2016-04-01
Funding is being requested pursuant to a proposal that was submitted and reviewed through the Portfolio Analysis and Management System (PAMS). PAMS Proposal ID: 222439. The proposed project consists of the design of a novel superconducting continuous-wave accelerator capable of providing a beam current of ~1 A at an energy of 1-2 MeV for the treatment of flue gases and wastewater streams. The novel approach consists on studying the feasibility of using a single-cell Nb cavity coated with a thin Nb3Sn layer of the inner surface and conductively cooled by to 4.2 K by cryocoolers inside a compact cryomodule. Themore » proposed study will include beam transport simulations, thermal and mechanical engineering analysis of the cryomodule and a cost analysis for both the fabrications costs and the operational and maintenance costs of such accelerator. The outcome of the project will be a report summarizing the analysis and results from the design study.« less
First experiments with the negative ion source NIO1.
Cavenago, M; Serianni, G; De Muri, M; Agostinetti, P; Antoni, V; Baltador, C; Barbisan, M; Baseggio, L; Bigi, M; Cervaro, V; Degli Agostini, F; Fagotti, E; Kulevoy, T; Ippolito, N; Laterza, B; Minarello, A; Maniero, M; Pasqualotto, R; Petrenko, S; Poggi, M; Ravarotto, D; Recchia, M; Sartori, E; Sattin, M; Sonato, P; Taccogna, F; Variale, V; Veltri, P; Zaniol, B; Zanotto, L; Zucchetti, S
2016-02-01
Neutral Beam Injectors (NBIs), which need to be strongly optimized in the perspective of DEMO reactor, request a thorough understanding of the negative ion source used and of the multi-beamlet optics. A relatively compact radio frequency (rf) ion source, named NIO1 (Negative Ion Optimization 1), with 9 beam apertures for a total H(-) current of 130 mA, 60 kV acceleration voltage, was installed at Consorzio RFX, including a high voltage deck and an X-ray shield, to provide a test bench for source optimizations for activities in support to the ITER NBI test facility. NIO1 status and plasma experiments both with air and with hydrogen as filling gas are described. Transition from a weak plasma to an inductively coupled plasma is clearly evident for the former gas and may be triggered by rising the rf power (over 0.5 kW) at low pressure (equal or below 2 Pa). Transition in hydrogen plasma requires more rf power (over 1.5 kW).
42 CFR 478.34 - Notice of a reconsidered determination.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SERVICES (CONTINUED) QUALITY IMPROVEMENT ORGANIZATIONS RECONSIDERATIONS AND APPEALS Utilization and Quality... submitting a request for an administrative hearing and the time period for filing a request. (b) Notice to...
20 CFR 404.925 - How to request expedited appeals process.
Code of Federal Regulations, 2010 CFR
2010-04-01
... DISABILITY INSURANCE (1950- ) Determinations, Administrative Review Process, and Reopening of Determinations... service in the railroad industry. (c) Extension of time to request expedited appeals process. If you want...
Tentler, Aleksey; Silberman, Jordan; Paterniti, Debora A; Kravitz, Richard L; Epstein, Ronald M
2008-01-01
The ways in which patients' requests for antidepressants affect physicians' prescribing behavior are poorly understood. To describe physicians' affective and cognitive responses to standardized patients' (SPs) requests for antidepressants, as well as the attitudinal and contextual factors influencing prescribing behavior. Focus group interviews and brief demographic questionnaires. Twenty-two primary care physicians in 6 focus groups; all had participated in a prior RCT of the influence of patients' requests on physicians' prescribing. Iterative review of interview transcripts, involving qualitative coding and thematic analysis. Physicians participating in the focus groups were frequently unaware of and denied the degree to which their thinking was biased by patient requests, but were able to recognize such biases after facilitated reflection. Common affective responses included annoyance and empathy. Common cognitive reactions resulted in further diagnostic inquiry or in acquiescing to the patient's demands to save time or build the patient-clinician relationship. Patients' requests for medication prompted the participants to err on the side of overtreating versus careful review of clinical indications. Lack of time and participants' attitudes--toward the role of the patient and the pharmaceutical ads--also influenced their responses, prompting them to interpret patient requests as diagnostic clues or opportunities for efficiency. This study provides a taxonomy of affective and cognitive responses to patients' requests for medications and the underlying attitudes and contextual factors influencing them. Improved capacity for moment-to-moment self-awareness during clinical reasoning processes may increase the appropriateness of prescribing.
Electron lenses for head-on beam-beam compensation in RHIC
Gu, X.; Fischer, W.; Altinbas, Z.; ...
2017-02-17
Two electron lenses (e-lenses) have been in operation during 2015 RHIC physics run as part of a head-on beam-beam compensation scheme. While the RHIC lattice was chosen to reduce the beam-beam induced resonance driving terms, the electron lenses reduced the beam-beam induced tune spread. This has been demonstrated for the first time. The beam-beam compensation scheme allows for higher beam-beam parameters and therefore higher intensities and luminosity. In this paper, we detailed the design considerations and verification of the electron beam parameters of the RHIC e-lenses. Lastly, longitudinal and transverse alignments with ion beams and the transverse beam transfer functionmore » (BTF) measurement with head-on electron-proton beam are presented.« less
Electron lenses for head-on beam-beam compensation in RHIC
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gu, X.; Fischer, W.; Altinbas, Z.
Two electron lenses (e-lenses) have been in operation during 2015 RHIC physics run as part of a head-on beam-beam compensation scheme. While the RHIC lattice was chosen to reduce the beam-beam induced resonance driving terms, the electron lenses reduced the beam-beam induced tune spread. This has been demonstrated for the first time. The beam-beam compensation scheme allows for higher beam-beam parameters and therefore higher intensities and luminosity. In this paper, we detailed the design considerations and verification of the electron beam parameters of the RHIC e-lenses. Lastly, longitudinal and transverse alignments with ion beams and the transverse beam transfer functionmore » (BTF) measurement with head-on electron-proton beam are presented.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... Privacy Program § 701.120 Processing requests that cite or imply PA, Freedom of Information (FOIA), or PA... maximum release of information allowed under the Acts. (d) Processing time limits. DON activities shall... 32 National Defense 5 2010-07-01 2010-07-01 false Processing requests that cite or imply PA...
43 CFR 2.11 - Why is it important to send my request to the right office?
Code of Federal Regulations, 2010 CFR
2010-10-01
... request to the FOIA Contact at the appropriate bureau office may delay processing, because the time limit... received by the bureau office where the records are maintained. The processing of your request may be delayed if you send it to the Secretary of the Interior (or other high-level officials), the Office of...