Digital Representation for Communication of Product Definition Data. Revision
1990-04-30
Treuhandgesellschaft Electrical Thomas C . Estervog Boeing Computer Services John C . Faulkner S D R C Ayron L. Fears IBM Corp. ix MEMBERS OF THE IGES/PDES...Force Eugene F. Gurga Computervision C . Hayden Hamilton III PDA Engineering William Hammon Tandem Computer Yosef Haridim Boeing Electronics Co. C ...British Aerospace Raphael McBain General Dynamics Corp. Dennis McBurney L-ueing Military Airplane Co Patrick McFadden Boeing Computer Services C . Kevin
Internal controls over computer-processed financial data at Boeing Petroleum Services
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-02-14
The Strategic Petroleum Reserve (SPR) is responsible for purchasing and storing crude oil to mitigate the potential adverse impact of any future disruptions in crude oil imports. Boeing Petroleum Services, Inc. (BPS) operates the SPR under a US Department of Energy (DOE) management and operating contract. BPS receives support for various information systems and other information processing needs from a mainframe computer center. The objective of the audit was to determine if the internal controls implemented by BPS for computer systems were adequate to assure processing reliability.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-03
..., (BCA) Including On-Site Leased Workers From Adecco, USA, Inc., Cascade Engineering, CDI Corporation...., Cascade Engineering, CDI Corporation, Chipton Ross, Inc., Comforce Corporation, Computer Staffing Services...
78 FR 72558 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-03
... service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services..., 2013), but requested that we incorporate Boeing Special Attention Service Bulletin 737-53-1260... Special Attention Service Bulletin 737-53-1260, dated May 7, 2007. Boeing also requested that we allow...
Natural Resource Information System. Volume I. Overall Description.
ERIC Educational Resources Information Center
Boeing Computer Services, Inc., Seattle, WA.
Recognizing the need for the development of a computer based information system which would handle remote sensing as well as conventional mapping data, the Bureau of Indian Affairs and the Bureau of Land Management contracted with Boeing Computer Services for the design and construction of a prototype Natural Resource Information System. The…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-23
... those described in Boeing Special Attention Service Bulletin 737-54-1044, dated December 10, 2007...., ``Compliance'' of Boeing Special Attention Service Bulletin 737-54- 1044, dated December 10, 2007; except... 737-54-1044, dated December 10, 2007; or Boeing Alert Service Bulletin 737-54A1044, Revision 2, dated...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-05
...., ``Compliance'' of Boeing Special Attention Service Bulletin 737-54- 1044, dated December 10, 2007; except... 737-54-1044, dated December 10, 2007; or Boeing Alert Service Bulletin 737-54A1044, Revision 2, dated... time specified in paragraph 1.E. of Boeing Special Attention Service Bulletin 737-54-1044, dated...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-10
... identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box... AD and in Boeing Special Attention Service Bulletin 727-53-0232, dated September 23, 2009, the... paragraph 1.E., ``Compliance,'' in Boeing Special Attention Service Bulletin 727-53-0232, dated September 23...
78 FR 59798 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-30
..., contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65... rule. We agree with United's request, since Boeing has issued Special Attention Service Bulletin 737-29..., which were reworked during production and on which the change specified in Boeing Special Attention...
Videotex--The Library of the Future.
ERIC Educational Resources Information Center
Mischo, Lare; Hegarty, Kevin
1982-01-01
Discusses a presentation prepared by Boeing Computer Services in cooperation with the Tacoma Public Library staff, which demonstrates the potential of interactive cable systems based on the Canadian Telidon system. Features of this videotex system, software, and equipment, including microcomputers, are noted. (EJS)
78 FR 40060 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-03
... identified in this AD, Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC... Attention Service Bulletin 777-78-0064, Revision 1, dated November 30, 2006. That AD requires repetitive... flight operation, on airplanes on which the optional terminating action (Boeing Special Attention Service...
76 FR 41673 - Airworthiness Directives; The Boeing Company Model 747-400 and -400D Series Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
... Airworthiness Directives; The Boeing Company Model 747-400 and - 400D Series Airplanes AGENCY: Federal Aviation... 747-400 and - 400D series airplanes, certificated in any category; as specified in Boeing Service... with the Accomplishment Instructions of Boeing Service Bulletin 747-29A2114, Revision 1, dated July 15...
Space station automation and robotics study. Operator-systems interface
NASA Technical Reports Server (NTRS)
1984-01-01
This is the final report of a Space Station Automation and Robotics Planning Study, which was a joint project of the Boeing Aerospace Company, Boeing Commercial Airplane Company, and Boeing Computer Services Company. The study is in support of the Advanced Technology Advisory Committee established by NASA in accordance with a mandate by the U.S. Congress. Boeing support complements that provided to the NASA Contractor study team by four aerospace contractors, the Stanford Research Institute (SRI), and the California Space Institute. This study identifies automation and robotics (A&R) technologies that can be advanced by requirements levied by the Space Station Program. The methodology used in the study is to establish functional requirements for the operator system interface (OSI), establish the technologies needed to meet these requirements, and to forecast the availability of these technologies. The OSI would perform path planning, tracking and control, object recognition, fault detection and correction, and plan modifications in connection with extravehicular (EV) robot operations.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-20
... Airworthiness Directives; The Boeing Company Model 747-100B SUD, -200B, -300, -400, and -400D Series Airplanes... Register previously approved the incorporation by reference of Boeing Alert Service Bulletin 747- 53A2484...; as identified in Boeing Service Bulletin 747-53A2484, Revision 1, dated February 12, 2009. Subject (d...
77 FR 54798 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-06
... that Figures 18 and 23 of Boeing Special Attention Service Bulletin 747-25-3586, dated November 12.... ADDRESSES: For service information identified in this AD, contact Boeing Commercial Airplanes, Attention.... Department of Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New...
77 FR 75827 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-26
..., contact Boeing Commercial Airplanes, Attention: Data & Services Management, P. O. Box 3707, MC 2H-65..., per Part 1 of the Work Instructions of Boeing Special Attention Service Bulletin 757- 53-0089, dated... the repair specified in paragraph (i) or (l) of this AD, or doing the preventive modification...
76 FR 8615 - Airworthiness Directives; The Boeing Company Model 767 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-15
... distinct checks as specified in Steps 1 and 2 of Figures 2 and 5 of Boeing Special Attention Service..., contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65..., Docket Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE...
77 FR 16147 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-20
... identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box... Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE... that note (f) of Figures 10 and 24 of Boeing Alert Service Bulletin 767-56A0010, Revision 1, dated...
77 FR 36139 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-18
... identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box... Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590... Parts 1 and 2 of the Work Instructions of Boeing Special Attention Service Bulletin 737-53-1204, dated...
77 FR 69747 - Airworthiness Directives; The Boeing Company Model Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-21
... frame upper outboard chord has been replaced as specified in Boeing Service Bulletin 737-53-1088: Prior... Bulletin 737-53-1088: Repeat the inspections required by paragraph (g) of this AD at the time specified in... as specified in Boeing Service Bulletin 737-53-1088: Perform close visual, PESW, and HFEC inspections...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-07
... reviewed Boeing Service Bulletins DC9-28-212 (for Model DC- 9-30, DC-9-40, and DC-9-50 series airplanes... on airplanes changed in accordance with Boeing Service Bulletin DC9-28-212 or MD90-28-010, both dated... accomplishing the modification). Boeing Service Bulletins DC9-28-212 and MD90-28-010, both Revision 1, both...
76 FR 2848 - Airworthiness Directives; The Boeing Company Model 757 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-18
... bracket on the left wing as shown in Figure 3 of Boeing Special Attention Service Bulletin 757-24-0105... lower bracket on the left wing, in accordance with Figure 3 of Boeing Special Attention Service Bulletin.... Mail: U.S. Department of Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-04
.... ADDRESSES: For service information identified in this AD, contact Boeing Commercial Airplanes, Attention... Management Facility, U.S. Department of Transportation, Docket Operations, M-30, West Building Ground Floor.... Figure 31, Sheet 7, of the Accomplishment Instructions of Boeing Alert Service Bulletin 747- 51A2060...
77 FR 58334 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
... Commercial Airplanes, Attention: Data & Services Management, P. O. Box 3707, MC 2H-65, Seattle, Washington.... Relevant Service Information We reviewed Boeing Special Attention Service Bulletin 737-29-1113, dated March 23, 2011. That service bulletin describes procedures for a general visual inspection for damage of...
75 FR 39811 - Airworthiness Directives; The Boeing Company Model 777 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-13
... Service Bulletin 777-57A0064, dated March 26, 2009, it is not necessary to perform the torque check on the... instructions in Boeing Alert Service Bulletin 777-57A0064, dated March 26, 2009, a torque check is redundant... are less than those for the torque check. Boeing notes that it plans to issue a new revision to this...
Review and verification of CARE 3 mathematical model and code
NASA Technical Reports Server (NTRS)
Rose, D. M.; Altschul, R. E.; Manke, J. W.; Nelson, D. L.
1983-01-01
The CARE-III mathematical model and code verification performed by Boeing Computer Services were documented. The mathematical model was verified for permanent and intermittent faults. The transient fault model was not addressed. The code verification was performed on CARE-III, Version 3. A CARE III Version 4, which corrects deficiencies identified in Version 3, is being developed.
NASA Technical Reports Server (NTRS)
Whalen, Edward A.
2016-01-01
This document serves as the final report for the Flight Services and Aircraft Access task order NNL14AA57T as part of NASA Environmentally Responsible Aviation (ERA) Project ITD12A+. It includes descriptions of flight test preparations and execution for the Active Flow Control (AFC) Vertical Tail and Insect Accretion and Mitigation (IAM) experiments conducted on the 757 ecoDemonstrator. For the AFC Vertical Tail, this is the culmination of efforts under two task orders. The task order was managed by Boeing Research & Technology and executed by an enterprise-wide Boeing team that included Boeing Research & Technology, Boeing Commercial Airplanes, Boeing Defense and Space and Boeing Test and Evaluation. Boeing BR&T in St. Louis was responsible for overall Boeing project management and coordination with NASA. The 757 flight test asset was provided and managed by the BCA ecoDemonstrator Program, in partnership with Stifel Aircraft Leasing and the TUI Group. With this report, all of the required deliverables related to management of this task order have been met and delivered to NASA as summarized in Table 1. In addition, this task order is part of a broader collaboration between NASA and Boeing.
DOT National Transportation Integrated Search
1975-07-01
A study has been made of the vortex wakes behind Boeing 727, Lockheed L-1011, McDonnell Douglas DC-10, and Boeing 747 aircraft in several flight configurations. An analytical method is developed for the computation of the wake vortex patterns and the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-02
... Airworthiness Directives; The Boeing Company Model 747-100, - 200B, and -200F Series Airplanes AGENCY: Federal... inconsistent with the terminology used in the structural repair manual and Boeing Alert Service Bulletin 747... The Boeing Company Model 747-100, 747- 200B, and 747-200F series airplanes, certificated in any...
1974-09-24
Transonic Flows with Imbedded Shock Waves", Boeing Scientific Research Laboratories Document D1-82-1053 (1971); also as invited lecture series for AGARD...Past Thin Lifting Airfoils", Boeing Scientific Research Laboratories Document D180-2298-1, June 1971. 5. Krupp, J. A. and Ia-man, 9. M., "Computation...Aerodynamics and Marine Sciences Laboratory, Boeing Scientific Research Laboratories, June 1971. 7. Krupp, J. A., "Documentation for Program TSONIC", Technical
Engineer Modeling Study. Volume II. Users Manual.
1982-09-01
Distribution Center, Digital Equip- ment Corporation, 1980). The following paragraphs briefly describe each of the major input sections...abbreviation 3. A sequence number for post-processing 4. Clock time 5. Order number pointer (six digits ) 6. Job number pointer (six digits ) 7. Unit number...KIT) Users Manual (Boeing Computer % Services, Inc., 1977). S VAX/VMS Users Manual. Volume 3A (Software Distribution Center, Digital Equipment
COMSAC: Computational Methods for Stability and Control. Part 1
NASA Technical Reports Server (NTRS)
Fremaux, C. Michael (Compiler); Hall, Robert M. (Compiler)
2004-01-01
Work on stability and control included the following reports:Introductory Remarks; Introduction to Computational Methods for Stability and Control (COMSAC); Stability & Control Challenges for COMSAC: a NASA Langley Perspective; Emerging CFD Capabilities and Outlook A NASA Langley Perspective; The Role for Computational Fluid Dynamics for Stability and Control:Is it Time?; Northrop Grumman Perspective on COMSAC; Boeing Integrated Defense Systems Perspective on COMSAC; Computational Methods in Stability and Control:WPAFB Perspective; Perspective: Raytheon Aircraft Company; A Greybeard's View of the State of Aerodynamic Prediction; Computational Methods for Stability and Control: A Perspective; Boeing TacAir Stability and Control Issues for Computational Fluid Dynamics; NAVAIR S&C Issues for CFD; An S&C Perspective on CFD; Issues, Challenges & Payoffs: A Boeing User s Perspective on CFD for S&C; and Stability and Control in Computational Simulations for Conceptual and Preliminary Design: the Past, Today, and Future?
77 FR 64711 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-23
... Service Bulletin 737-22A1224, dated May 18, 2012, requires installation of FCC software P/N 2274-COL-AC1..., 2010, because that service bulletin only specifies to install FCC OPS software P/N 2276-COL-AC1-05 or P...) Install software identified in table 2 of the Accomplishment Instructions of Boeing Alert Service Bulletin...
78 FR 43766 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-22
... Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, WA... fleet availability or span-time of the planned scheduled maintenance check. Conclusion We reviewed the..., at the applicable time specified in paragraph 1.E., ``Compliance,'' of Boeing Special Attention...
78 FR 65171 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-31
... airplane undergoing a passenger- to-freighter conversion. This AD requires doing a general visual... service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services... proposed to require doing a general visual inspection of the station 1920 splice clip for correct fastener...
78 FR 57542 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-19
... cracked retract actuator fuse pins that could fail earlier than the previously determined safe life limit... 5 p.m., Monday through Friday, except Federal holidays. For service information identified in this proposed AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-13
... Airworthiness Directives; The Boeing Company Model 747-100, 747- 100B, 747-100B SUD, 747-200B, 747-200C, 747.... Affected ADs (b) None. Applicability (c) This AD applies to The Boeing Company Model 747-100, 747-100B, 747..., certificated in any category; as identified in Boeing Alert Service Bulletin 747-53A2750, dated August 27, 2009...
78 FR 68693 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-15
... Special Attention Service Bulletin 737-53-1296, dated January 11, 2011, in Step 1, ``Move,'' of Figure 10.... ADDRESSES: For service information identified in this AD, contact Boeing Commercial Airplanes, Attention... Facility, U.S. Department of Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12...
78 FR 57053 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-17
... Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, WA... Management Facility, U.S. Department of Transportation, Docket Operations, M-30, West Building Ground Floor... frame from stringers 23 through 31 per Figure 5 or Figure 6 of the service bulletins specified in...
77 FR 52212 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-29
... request to revise this AD. The inspections specified in Figure 1 in both Boeing Special Attention Service... Commercial Airplanes, Attention: Data & Services Management, P. O. Box 3707, MC 2H-65, Seattle, Washington... Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590. FOR FURTHER...
2003-09-03
KENNEDY SPACE CENTER, FLA. - Boeing workers perform a 3D digital scan of the actuator on the table. At left is Dan Clark. At right are Alden Pitard (seated at computer) and John Macke, from Boeing, St. Louis. . There are two actuators per engine on the Shuttle, one for pitch motion and one for yaw motion. The Space Shuttle Main Engine hydraulic servoactuators are used to gimbal the main engine.
Big-BOE: Fusing Spanish Official Gazette with Big Data Technology.
Basanta-Val, Pablo; Sánchez-Fernández, Luis
2018-06-01
The proliferation of new data sources, stemmed from the adoption of open-data schemes, in combination with an increasing computing capacity causes the inception of new type of analytics that process Internet of things with low-cost engines to speed up data processing using parallel computing. In this context, the article presents an initiative, called BIG-Boletín Oficial del Estado (BOE), designed to process the Spanish official government gazette (BOE) with state-of-the-art processing engines, to reduce computation time and to offer additional speed up for big data analysts. The goal of including a big data infrastructure is to be able to process different BOE documents in parallel with specific analytics, to search for several issues in different documents. The application infrastructure processing engine is described from an architectural perspective and from performance, showing evidence on how this type of infrastructure improves the performance of different types of simple analytics as several machines cooperate.
78 FR 11569 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-19
... Commercial Airplanes, Attention: Data & Services Management, P. O. Box 3707, MC 2H-65, Seattle, WA 98124-2207... Facility, U.S. Department of Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12... specified in Boeing Special Attention Service Bulletin 757-57-0068, Revision 1, dated July 19, 2011 (which...
77 FR 12170 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-29
... Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, Washington... Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590... 22, 2010) The NPRM (75 FR 3660, January 22, 2010) referred to Boeing Special Attention Service...
2005-03-18
IDS, the treatment and handling of Boeing World Headquarters (BWHQ) costs, common or shared systems costs, Shared Services Group costs, fringe...these expenses.15 One such example is the addition of the Shared Services Group (SSG) expense to the Mesa and Philadelphia accounting ledgers. Under
1993-06-01
June 1993 Special Interest Group for Ada Artificial Intelligence Working Group 1992 Summer Workshop Janet Faye Johns Ac- i cr N 7 Dilt S ." Contract ...Sponsor %/A Contract No. N/A Project No. G30D [- t Dept. G033 Approved for public release. distribution unlimited. MITRE Bedford, Massachusetts ABSTRACT...FAX) George (Rick) Wilbur Boeing Computer Services Box 24346, Mailstop 9H-84 Seattle, WA 98124 206-394-3055 (phone) 206-394-3064 (FAX) Mik Yen
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-02
... certain boost pump relays with ground fault interrupter (GFI) relays. For certain other airplanes, this AD... service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services... Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590. FOR FURTHER...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-13
... expected to produce exports or provide services in competition with the exportation of goods or provision of services by a United States industry. Parties: Principal Supplier: The Boeing Company. Obligor: Philippine Airlines, Inc. Guarantor(s): N/A. Description of Items Being Exported: Boeing 777 aircraft...
78 FR 15658 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-12
... Commercial Airplanes, Attention: Data & Services Management, P. O. Box 3707, MC 2H-65, Seattle, WA 98124-2207... upper skin and rear spar upper chord between LBL 70.50 and RBL 70.50 at STA 870. The crack sizes ranged... We reviewed Boeing Special Attention Service Bulletin 727-57-0187, dated March 8, 2012. For...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-12
..., January 18, 2011) as follows: ``Figure 1 of the Accomplishment Instructions of Boeing Special Attention... Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle... Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-18
... Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590. Hand Delivery.... For service information identified in this proposed AD, contact Boeing Commercial Airplanes, Attention... Attention Service Bulletin 777-29-0032, dated August 9, 2007 (for Model 777-200, -200LR, -300, and -300ER...
77 FR 58791 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-24
... revision to the airworthiness limitations of the maintenance planning data document. This proposed AD would... information identified in this proposed AD, contact Boeing Commercial Airplanes, Attention: Data & Services... Marsh, Aerospace Engineer, Airframe Branch, ANM-120S, Seattle Aircraft Certification Office, FAA, 1601...
75 FR 77793 - Airworthiness Directives; The Boeing Company Model 747 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-14
... would reduce the initial compliance time and repetitive inspection interval in the existing AD. This proposed AD results from fleet information indicating that the repetitive inspection interval in the... reduce the repetitive inspection intervals. Relevant Service Information We have reviewed Boeing Alert...
78 FR 61161 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-03
..., contact Boeing Commercial Airplanes, Attention: Data & Services Management, 3855 Lakewood Boulevard, MC... the Internet at http://www.regulations.gov ; or in person at the Docket Management Facility between 9...: 800-647-5527) is Document Management Facility, U.S. Department of Transportation, Docket Operations, M...
78 FR 73744 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-09
.... Mail: U.S. Department of Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12... Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE... information identified in this proposed AD, contact Boeing Commercial Airplanes, Attention: Data & Services...
76 FR 82210 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-30
... fuse pins that can fail earlier than the previously determined safe life limit of the pins. A fractured... retract actuator fuse pins that can fail earlier than previously determined safe life limit of the pins. A... Friday, except Federal holidays. For service information identified in this proposed AD, contact Boeing...
77 FR 37781 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-25
... actuator fuse pins that can fail earlier than the previously determined safe life limit of the pins. A... that can fail earlier than the previously determined safe life limit of the pins. A fractured retract... July 30, 2012. ADDRESSES: For service information identified in this AD, contact Boeing Commercial...
78 FR 58982 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-25
... information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management... Management Facility between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD docket... affects 1,050 airplanes of U.S. registry. The new proposed requirements add no significant economic burden...
77 FR 46943 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-07
... compliance time; therefore, an operator may choose to add the reinforcing fiberglass overcoat before the... discrepant quantities of nut plates and types of fasteners called out in Boeing Alert Service Bulletin 747... different airplane configuration that might use a different quantity of nut plates than what is specified in...
NASA Technical Reports Server (NTRS)
Holdeman, J. D.; Jasperson, W. H.
1985-01-01
Measurements of ozone concentrations at cruise altitudes both outside and in the cabin of a Boeing 747SP and Boeing 747-100 airliners in routine commercial service are presented. Plotted and tabulated data are identified by route and are arranged chronologically for each airplane. These data were taken at 5- or 10-min intervals by automated instruments used in the NASA Global Atmospheric Sampling Program (GASP). All GASP cabin ozone data obtained from October 1978 to early July 1979 are presented.
77 FR 16188 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-20
..., M-30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590... Airplanes, Attention: Data & Services Management, P. O. Box 3707, MC 2H-65, Seattle, Washington 98124-2207... AD would require repair using a method approved in accordance with paragraph (l). Figure 1 of Boeing...
75 FR 31327 - Airworthiness Directives; The Boeing Company Model 757 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-03
... Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590. Hand Delivery: U.S. Department of Transportation, Docket Operations, M-30, West Building Ground Floor... Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle...
78 FR 66254 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-05
... AD. Costs of Compliance We estimate that this AD affects 84 airplanes of U.S. registry. We estimate... inspection cycle. We have received no definitive data that would enable us to provide a cost estimate for the... 2 of paragraph 1.E., ``Compliance,'' of Boeing Service Bulletin 747-53A2688, Revision 1, dated...
78 FR 6254 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-30
... in paragraph (f) of the previous NPRM (73 FR 32258, June 6, 2008) (referred to as paragraph (g) in... do not agree with the 3-year calendar time. As specified previously, Boeing has issued Alert Service... flight hours or 24 months, whichever occurs first. Continental Airlines (CAL), British Airways (BA), KLM...
78 FR 21236 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-10
... Boeing Company Model 757 airplanes equipped with Rolls- Royce RB211-535E engines. That AD currently... attachment bolts of the aft hinge fittings of the thrust reversers. Request To Accomplish Certain Steps in the Service Information Out of Sequence AAL asked that it be allowed to accomplish certain steps in...
75 FR 17887 - Airworthiness Directives; The Boeing Company Model 767 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-08
... torque to the nut and bolt of the main track downstop assembly. The corrective actions include: Installing a bolt and spacer with a new nut (including applying torque to make sure that it has been.... Tightening the existing nut. Boeing Special Attention Service Bulletin 767-57-0118, dated October 8, 2009...
Watermarking requirements for Boeing digital cinema
NASA Astrophysics Data System (ADS)
Lixvar, John P.
2003-06-01
The enormous economic incentives for safeguarding intellectual property in the digital domain have made forensic watermarking a research topic of considerable interest. However, a recent examination of some of the leading product development efforts reveals that at present there is no effective watermarking implementation that addresses both the fidelity and security requirements of high definition digital cinema. If Boeing Digital Cinema (BDC, a business unit of Boeing Integrated Defense Systems) is to succeed in using watermarking as a deterrent to the unauthorized capture and distribution of high value cinematic material, the technology must be robust, transparent, asymmetric in its insertion/detection costs, and compatible with all the other elements of Boeing's multi-layered security system, including its compression, encryption, and key management services.
2012-09-28
HOUSTON -- NASA Astronaut Lee Archambault performs an evaluation of reach and visibility of controls and displays during an end-of-year interior layout evaluation of The Boeing Company's CST-100 spacecraft. The evaluation at Boeing's Houston Product Support Center in Texas was part of the company's ongoing work supporting its funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the Commercial Crew Integrated Capability, or CCiCap, initiative. CCP is intended to lead to the availability of commercial human spaceflight services for government and commercial customers to low-Earth orbit. Future development and certification initiatives eventually will lead to the availability of human spaceflight services for NASA to send its astronauts to the International Space Station, where critical research is taking place daily. For more information about CCP, go to http://www.nasa.gov/commercialcrew. Photo credit: Boeing
2014-01-06
HOUSTON – Chris Ferguson, a former space shuttle commander who is now director of Crew and Mission Operations for Boeing Space Exploration, talks with an engineer following simulations that showed that the CST-100 software. Boeing demonstrated that the CST-100 software allows a human pilot to take over control of the spacecraft from the computer during all phases of a mission following separation from the launch vehicle. The pilot-in-the-loop demonstration at the Houston Product Support Center is a milestone under Boeing's Commercial Crew Integrated Capability agreement with the agency and its Commercial Crew Program. Photo credit: NASA/Bill Stafford
76 FR 65991 - Airworthiness Directives; The Boeing Company Model 757 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-25
... Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE... Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and... proposed AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC...
76 FR 22828 - Airworthiness Directives; The Boeing Company Model 737-700 Series Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-25
... results from reports that the aft seat leg fittings span the station (STA) 521.45 stay-out zone. We are... identified in this proposed AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P... proposed AD. Discussion We have received a report that the aft seat leg fittings span the station (STA) 521...
75 FR 71534 - Airworthiness Directives; The Boeing Company Model 737-900ER Series Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-24
... the products listed above. This AD requires doing a one-time general visual inspection for a keyway in..., contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65... Register on August 10, 2010 (75 FR 48281). That NPRM proposed to require a general visual inspection for a...
76 FR 47427 - Airworthiness Directives; The Boeing Company Model 747-400 and -400F Series Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-05
... the products listed above. This AD requires a general visual inspection for cracks and holes of the... Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle... published in the Federal Register on February 10, 2011 (76 FR 7513). The NPRM proposed a general visual...
75 FR 48281 - Airworthiness Directives; The Boeing Company Model 737-900ER Series Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-10
... a one-time general visual inspection for a keyway in two fuel tank access door cutouts, and related... proposed AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P. O. Box 3707, MC... bulletin describes procedures for a general visual inspection for a keyway in the fuel tank access door...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-20
... proposed AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC... is cracked, has gaps, is loose, or is missing; repetitive general visual inspections of click bond... sealant Doing an NDT and general visual inspection for thermal degradation of the exposed T/R inner wall...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-01
... Fuel System Airworthiness Limitations, the requirements of Appendix H.1(a) of the Federal Aviation... Additional Service Information The ATA, on behalf of its member AirTran Airways, requested that we approve... comment, AirTran Airways stated that the information notices clarify and provide corrections to Boeing...
Optoelectric Technology Roadmap: Conclusions and Recommendations
1994-05-01
Haitz Hughes Adrian Popa Robert Buckley IBM Maurizio Arienzo John Crow NYNEX Robert Lawrence Motorola Ron Nelson 3M Charles T. Walker OPTOELECTRONIC...Bellcore (1) Industrial Mark Chandler, Hewlett-Packard Military/Aerospace Richard Lind, Hughes Luis Figueroa , Boeing Computer John Crow, IBM...Bellcore William Womack AT&T Matt Goodman Bellcore Dwight Duston BMDO Paul Shumate Bellcore Luis Figueroa Boeing Richard Jones Broadband Technologies
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-02
... this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC.... Department of Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New.... Required parts cost about $122,617 per product. Based on these figures, we estimate the cost of this AD to...
78 FR 22439 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-16
..., West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590. Hand..., Attention: Data & Services Management, P. O. Box 3707, MC 2H-65, Seattle, WA 98124-2207; phone: 206-544-5000... SRM 53-30-1, Figures 20, 21, 31, or 32; and Boeing 737-300/-400/-500 SRM 53-10-01, Repair 5, 6, or 8...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-22
... assembly A detailed inspection for tears, holes, and disbonds of the wear spacer A measurement of the... detailed inspection for tears, holes, and disbonds of the wear spacer, in accordance with Appendix A of Boeing Special Attention Service Bulletin 737-78-1083, dated June 30, 2010. If any tear, hole, or disbond...
Simulation of an enhanced TCAS 2 system in operation
NASA Technical Reports Server (NTRS)
Rojas, R. G.; Law, P.; Burnside, W. D.
1987-01-01
Described is a computer simulation of a Boeing 737 aircraft equipped with an enhanced Traffic and Collision Avoidance System (TCAS II). In particular, an algorithm is developed which permits the computer simulation of the tracking of a target airplane by a Boeing 373 which has a TCAS II array mounted on top of its fuselage. This algorithm has four main components: namely, the target path, the noise source, the alpha-beta filter, and threat detection. The implementation of each of these four components is described. Furthermore, the areas where the present algorithm needs to be improved are also mentioned.
2014-01-06
HOUSTON – Chris Ferguson, a former space shuttle commander who is now director of Crew and Mission Operations for Boeing Space Exploration, takes the controls inside the company's CST-100 spacecraft simulator. To Ferguson's right, an engineer observes the exercise. Boeing demonstrated that the CST-100's software allows a human pilot to take over control of the spacecraft from the computer during all phases of a mission following separation from the launch vehicle. The pilot-in-the-loop demonstration at the Houston Product Support Center is a milestone under Boeing's Commercial Crew Integrated Capability agreement with the agency and its Commercial Crew Program. Photo credit: NASA/Bill Stafford
2013-07-22
HOUSTON - JSC2013e068259 - NASA astronaut Serena Aunon prepares for a fit check evaluation of The Boeing Company's CST-100 spacecraft at the company's Houston Product Support Center. Assisting her is Andrea Gilkey, a human factors engineer with The Boeing Company. Aunon's fit check will help evaluate a crew's maneuverability in the spacecraft and test communications. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
DOEDEF Software System, Version 2. 2: Operational instructions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meirans, L.
The DOEDEF (Department of Energy Data Exchange Format) Software System is a collection of software routines written to facilitate the manipulation of IGES (Initial Graphics Exchange Specification) data. Typically, the IGES data has been produced by the IGES processors for a Computer-Aided Design (CAD) system, and the data manipulations are user-defined ''flavoring'' operations. The DOEDEF Software System is used in conjunction with the RIM (Relational Information Management) DBMS from Boeing Computer Services (Version 7, UD18 or higher). The three major pieces of the software system are: Parser, reads an ASCII IGES file and converts it to the RIM database equivalent;more » Kernel, provides the user with IGES-oriented interface routines to the database; and Filewriter, writes the RIM database to an IGES file.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-17
... Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle... Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590... reviewed the figures we have used over the past several years to calculate AD costs to operators. To...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-28
..., contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65... contain a provision excluding inspections of areas that are covered by repairs that span a minimum of... a repair even if it does not span a potential scribe by 3 or more fastener rows and there is no...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-07
... removing corrosion from fail-safe straps. We have received Boeing Service Bulletin 767-53A0100, Revision 3.... That AD currently requires inspections to detect cracking or corrosion of the fail-safe straps between... cracks in 51 fail-safe straps on 41 airplanes; we have also received a report of a crack found in the ``T...
STS-92 - Towing of Shuttle Discovery and Boeing 747 Shuttle Carrier Aircraft (SCA)
2000-11-02
The Space Shuttle Discovery sits atop one of NASA’s modified Boeing 747 Shuttle Carrier Aircraft as the unusual piggyback duo is towed along a taxiway at NASA’s Dryden Flight Research Center at Edwards, California. The Discovery was ferried from NASA Dryden to NASA’s Kennedy Space Center in Florida on November 2, 2000, after extensive pre-ferry servicing and preparations.
2014-01-06
HOUSTON – Engineers for Boeing Space Exploration demonstrate that the CST-100 software allows a human pilot to take over control of the spacecraft from the computer during all phases of a mission following separation from the launch vehicle. The pilot-in-the-loop demonstration at the Houston Product Support Center is a milestone under Boeing's Commercial Crew Integrated Capability agreement with the agency and its Commercial Crew Program. Photo credit: NASA/Bill Stafford
2014-01-06
HOUSTON – Engineers for Boeing Space Exploration demonstrate that the CST-100 software allows a human pilot to take over control of the spacecraft from the computer during all phases of a mission following separation from the launch vehicle. The pilot-in-the-loop demonstration at the Houston Product Support Center is a milestone under Boeing's Commercial Crew Integrated Capability agreement with the agency and its Commercial Crew Program. Photo credit: NASA/Bill Stafford
Experimental and Computational Sonic Boom Assessment of Boeing N+2 Low Boom Models
NASA Technical Reports Server (NTRS)
Durston, Donald A.; Elmiligui, Alaa; Cliff, Susan E.; Winski, Courtney S.; Carter, Melissa B.; Walker, Eric L.
2015-01-01
Near-field pressure signatures were measured and computational predictions made for several sonic boom models representing Boeing's Quiet Experimental Validation Concept (QEVC) supersonic transport, as well as three axisymmetric calibration models. Boeing developed the QEVC under a NASA Research Announcement (NRA) contract for Experimental Systems Validations for N+2 Supersonic Commercial Transport Aircraft, which was led by the NASA High Speed Project under the Fundamental Aeronautics Program. The concept was designed to address environmental and performance goals given in the NRA, specifically for low sonic boom loudness levels and high cruise efficiency, for an aircraft anticipated to enter service in the 2020 timeframe. Wind tunnel tests were conducted on the aircraft and calibration models during Phases I and II of the NRA contract from 2011 to 2013 in the NASA Ames 9- by 7-Foot and NASA Glenn 8- by 6-Foot Supersonic Wind Tunnels. Sonic boom pressure signatures were acquired primarily at Mach 1.6 and 1.8, and force and moment data were acquired from Mach 0.8 to 1.8. The sonic boom test data were obtained using a 2-in. flat-top pressure rail and a 14-in. round-top tapered "reflection factor 1" (RF1) pressure rail. Both rails capture an entire pressure signature in one data point, and successive signatures at varying positions along or above the rail were used to improve data quality through spatial averaging. The sonic boom data obtained by the rails were validated with high-fidelity numerical simulations of off-body pressures using the CFD codes USM3D, Cart3D, and OVERFLOW. The test results from the RF1 rail showed good agreement between the computational and experimental data when a variety of testing techniques including spatial averaging of a series of pressure signatures were employed, however, reflections off the 2-in. flat-top rail caused distortions in the signatures that did not agree with the CFD predictions. The 9 x 7 and 8 x 6 wind tunnels generally produced comparable data.
Coordination and Control for Multi-Quadrotor UAV Missions
2012-03-01
space equation uses a set of matrices to set up a series of first-order differential equations of the vehicle states. Some flexibility exists in...challenges with autonomous micro aerial vehicles.” Int. Symp. On Robotics Research, 2011 [11] M. Turpin , N. Michael, & V. Kumar, (2012). “Trajectory design...Mathematics and Engineer- ingAnalysis, TechnicalDocumentMEA-LR-085. Boeing Information and Support Services, The Boeing Company, Seattle ( 1997 ) [23] O
2013-07-08
LAS VEGAS, Nev. – The Boeing Company performed simulated contingency water landing scenarios with a mock-up CST-100 spacecraft at Bigelow Aerospace's headquarters near Las Vegas. The CST-100 is designed for ground landings, but could splash down on the water, if necessary. During the water tests, Department of Defense search-and-recovery personnel practiced pulling five Boeing engineers out of the capsule and to safety. The tests are part of the company’s ongoing work supporting its funded Space Act Agreement with NASA’s Commercial Crew Program, or CCP, during the Commercial Crew Integrated Capability, or CCiCap, initiative. CCP is intended to lead to the availability of commercial human spaceflight services for government and commercial customers to low-Earth orbit. Future development and certification initiatives eventually will lead to the availability of human spaceflight services for NASA to send its astronauts to the International Space Station, where critical research is taking place daily. For more information about CCP, go to http://www.nasa.gov/commercialcrew. Photo credit: Boeing
Transonic CFD applications at Boeing
NASA Technical Reports Server (NTRS)
Tinoco, E. N.
1989-01-01
The use of computational methods for three dimensional transonic flow design and analysis at the Boeing Company is presented. A range of computational tools consisting of production tools for every day use by project engineers, expert user tools for special applications by computational researchers, and an emerging tool which may see considerable use in the near future are described. These methods include full potential and Euler solvers, some coupled to three dimensional boundary layer analysis methods, for transonic flow analysis about nacelle, wing-body, wing-body-strut-nacelle, and complete aircraft configurations. As the examples presented show, such a toolbox of codes is necessary for the variety of applications typical of an industrial environment. Such a toolbox of codes makes possible aerodynamic advances not previously achievable in a timely manner, if at all.
76 FR 73491 - Airworthiness Directives; McDonnell Douglas Corporation Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-29
... issued revised service rework drawings to clarify the repair instructions. These service rework drawings... have updated the references in paragraph (g) of this AD to include Boeing DC-10-10 Service Rework... DC-10-10 Service Rework Drawing SR10570048, Revision K, dated October 7, 2010, including Parts List...
2013-07-22
HOUSTON - The Boeing Company unveils its fully outfitted CST-100 mock-up at the company's Houston Product Support Center in Texas. This test version is optimized to support five crew members and will allow the company to evaluate crew safety, interfaces, communications, maneuverability and ergonomics. Boeing's CST-100 is designed being to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations, including the International Space Station. Boeing is one of three aerospace industry partners working with CCP during its Commercial Crew Integrated Capability, or CCiCap, initiative, which is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
2013-07-22
HOUSTON - The Boeing Company unveils its fully outfitted CST-100 mock-up at the company's Houston Product Support Center in Texas. This test version is optimized to support five crew members and will allow the company to evaluate crew safety, interfaces, communications, maneuverability and ergonomics. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations, including the International Space Station. Boeing is one of three aerospace industry partners working with CCP during its Commercial Crew Integrated Capability, or CCiCap, initiative, which is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
Spacecraft Orbit Design and Analysis (SODA), version 1.0 user's guide
NASA Technical Reports Server (NTRS)
Stallcup, Scott S.; Davis, John S.
1989-01-01
The Spacecraft Orbit Design and Analysis (SODA) computer program, Version 1.0 is described. SODA is a spaceflight mission planning system which consists of five program modules integrated around a common database and user interface. SODA runs on a VAX/VMS computer with an EVANS & SUTHERLAND PS300 graphics workstation. BOEING RIM-Version 7 relational database management system performs transparent database services. In the current version three program modules produce an interactive three dimensional (3D) animation of one or more satellites in planetary orbit. Satellite visibility and sensor coverage capabilities are also provided. One module produces an interactive 3D animation of the solar system. Another module calculates cumulative satellite sensor coverage and revisit time for one or more satellites. Currently Earth, Moon, and Mars systems are supported for all modules except the solar system module.
Langley's Computational Efforts in Sonic-Boom Softening of the Boeing HSCT
NASA Technical Reports Server (NTRS)
Fouladi, Kamran
1999-01-01
NASA Langley's computational efforts in the sonic-boom softening of the Boeing high-speed civil transport are discussed in this paper. In these efforts, an optimization process using a higher order Euler method for analysis was employed to reduce the sonic boom of a baseline configuration through fuselage camber and wing dihedral modifications. Fuselage modifications did not provide any improvements, but the dihedral modifications were shown to be an important tool for the softening process. The study also included aerodynamic and sonic-boom analyses of the baseline and some of the proposed "softened" configurations. Comparisons of two Euler methodologies and two propagation programs for sonic-boom predictions are also discussed in the present paper.
2013-07-22
HOUSTON - JSC2013e068344 - NASA astronaut Randy Bresnik gets into position in The Boeing Company's CST-100 spacecraft for a fit check evaluation at the company's Houston Product Support Center. Bresnik's fit check will help evaluate a crew's maneuverability in the spacecraft and test communications. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
2013-07-22
HOUSTON - JSC2013e068317 - NASA astronaut Serena Aunon exits The Boeing Company's CST-100 spacecraft following a fit check evaluation at the company's Houston Product Support Center. Aunon's fit check will help evaluate a crew's maneuverability in the spacecraft and test communications. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
2013-07-22
HOUSTON - JSC2013e068269 - NASA astronaut Serena Aunon prepares to enter The Boeing Company's CST-100 spacecraft for a fit check evaluation at the company's Houston Product Support Center. Aunon's fit check will help evaluate a crew's maneuverability in the spacecraft and test communications. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
2013-07-22
HOUSTON - JSC2013e068333 - NASA astronaut Randy Bresnik prepares to enter The Boeing Company's CST-100 spacecraft for a fit check evaluation at the company's Houston Product Support Center. Bresnik's fit check will help evaluate a crew's maneuverability in the spacecraft and test communications. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
2013-07-22
HOUSTON - JSC2013e068260 - NASA astronaut Serena Aunon suits up for a fit check evaluation of The Boeing Company's CST-100 spacecraft at the company's Houston Product Support Center. Aunon's fit check will help evaluate a crew's maneuverability in the spacecraft and test communications. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
Commercial crew astronauts on This Week @NASA – July 10, 2015
2015-07-10
NASA has selected four astronauts to work closely with two U.S. commercial companies that will return human spaceflight launches to Florida’s Space Coast. NASA named veteran astronauts and experienced test pilots Robert Behnken, Eric Boe, Douglas Hurley and Sunita Williams to work closely with Boeing and SpaceX. NASA contracted with Boeing and SpaceX to develop crew transportation systems and provide crew transportation services to and from the International Space Station. The agency will select the commercial crew astronauts from this group of four for the first test, which is scheduled for 2017. Also, NASA’s newest astronauts, New Horizons still on track, Benefits for Humanity, Cargo ship arrives at space station, Training continues for next ISS crew and more!
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. In the mobile service tower on Launch Pad 17-A, Cape Canaveral Air Force Station, Boeing technicians help guide the Swift spacecraft as it is lowered toward the Boeing Delta II launch vehicle for mating. Swift is scheduled to launch Nov. 17. The liftoff aboard a Boeing Delta II rocket is targeted at the opening of a one-hour launch window beginning at 12:09 p.m. EST. A first-of-its-kind multi-wavelength observatory dedicated to the study of gamma-ray burst (GRB) science, Swifts three instruments will work together to observe GRBs and afterglows in the gamma ray, X-ray, ultraviolet and optical wavebands. Gamma-ray bursts are distant, yet fleeting explosions that appear to signal the births of black holes.
2013-07-22
HOUSTON - JSC2013e068247 - The Boeing Company unveils its fully outfitted CST-100 mock-up at the company's Houston Product Support Center in Texas. This test version is optimized to support five crew members and will allow the company to evaluate crew safety, interfaces, communications, maneuverability and ergonomics. Boeing's CST-100 is designed being to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations, including the International Space Station. Boeing is one of three aerospace industry partners working with CCP during its Commercial Crew Integrated Capability, or CCiCap, initiative, which is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
2013-07-22
HOUSTON - JSC2013e068244 - The Boeing Company unveils the interior of its fully outfitted CST-100 mock-up at the company's Houston Product Support Center in Texas. This test version is optimized to support five crew members and will allow the company to evaluate crew safety, interfaces, communications, maneuverability and ergonomics. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations, including the International Space Station. Boeing is one of three aerospace industry partners working with CCP during its Commercial Crew Integrated Capability, or CCiCap, initiative, which is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
2013-07-22
HOUSTON - JSC2013e068245 - The Boeing Company unveils the interior its fully outfitted CST-100 mock-up at the company's Houston Product Support Center in Texas. This test version is optimized to support five crew members and will allow the company to evaluate crew safety, interfaces, communications, maneuverability and ergonomics. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations, including the International Space Station. Boeing is one of three aerospace industry partners working with CCP during its Commercial Crew Integrated Capability, or CCiCap, initiative, which is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-20
..., Multax, Inconen, CTS, Hi-Tec, Woods, Ciber, Kelly Services, Analysts International Corp, Comsys, Filter..., Comsys, Filter LLC, Excell, Entegee, Chipton-Ross, Ian Martin, Can-Tech, It Services, IDEX Solutions (NW..., Kelly Services, Analysts International Corp, Comsys, Filter LLC, Excell, Entegee, Chipton-Ross, Ian...
75 FR 38945 - Airworthiness Directives; The Boeing Company Model 777-200 and -300 Series Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-07
..., 2006. The service bulletin describes procedures for installing new operational software in the cabin... loading the new cabin services system central storage device software and CSCP OPS into the MMC. FAA's... cabin services system central storage device software and cabin system control panel operational...
NASA Technical Reports Server (NTRS)
1984-01-01
Boeing Commercial Airplane Company's Flight Control Department engineers relied on Langley developed software package known as ORACLS to develop an advanced control synthesis package for both continuous and discrete control system. Package was used by Boeing for computerized analysis of new system designs. Resulting applications include a multiple input/output control system for the terrain-following navigation equipment of the Air Forces B-1 Bomber, and another for controlling in flight changes of wing camber on an experimental airplane. ORACLS is one of 1,300 computer programs available from COSMIC.
1987-10-01
Airplane Fuel Tank Ullage Compositions ~C A. J. Roth BOEING MILITARY AIRPLANE COMPANY P. 0. Box 3707 Seattle, Washington 98124-2207 October 1987 FINAL...controlled mission simulations were made using the ModComp computer to control the Simulated Aircraft Fuel Tank Environment ( SAFTEI facility at Wright...of this report. iii PREFACE This is a final report of work conducted under F33615-84-C-2431 and submitted by the Boeing Military Airplane Company
2005-12-01
KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center’s Payload Hazardous Servicing Facility, Boeing workers attach a crane to the top of the cover surrounding the third stage, or upper stage, for the New Horizons spacecraft. The third stage is a Boeing STAR 48 solid-propellant kick motor. The launch vehicle for New Horizons is the Atlas V rocket, scheduled to launch from Cape Canaveral Air Force Station, Fla., during a 35-day window that opens Jan. 11, and fly through the Pluto system as early as summer 2015.
NASA Technical Reports Server (NTRS)
Howell, W. E.
1974-01-01
The structural performance of a boron-epoxy reinforced titanium drag strut, which contains a bonded scarf joint and was designed to the criteria of the Boeing 747 transport, was evaluated. An experimental and analytical investigation was conducted. The strut was exposed to two lifetimes of spectrum loading and was statically loaded to the tensile and compressive design ultimate loads. Throughout the test program no evidence of any damage in the drag strut was detected by strain gage measurements, ultrasonic inspection, or visual observation. An analytical study of the bonded joint was made using the NASA structural analysis computer program NASTRAN. A comparison of the strains predicted by the NASTRAN computer program with the experimentally determined values shows excellent agreement. The NASTRAN computer program is a viable tool for studying, in detail, the stresses and strains induced in a bonded joint.
Improved computer simulation of the TCAS 3 circular array mounted on an aircraft
NASA Astrophysics Data System (ADS)
Rojas, R. G.; Chen, Y. C.; Burnside, Walter D.
1989-03-01
The Traffic advisory and Collision Avoidance System (TCAS) is being developed by the Federal Aviation Administration (FAA) to assist aircraft pilots in mid-air collision avoidance. This report concentrates on the computer simulation of the enchanced TCAS 2 systems mounted on a Boeing 727. First, the moment method is used to obtain an accurate model for the enhanced TCAS 2 antenna array. Then, the OSU Aircraft Code is used to generate theoretical radiation patterns of this model mounted on a simulated Boeing 727 model. Scattering error curves obtained from these patterns can be used to evaluate the performance of this system in determining the angular position of another aircraft with respect to the TCAS-equipped aircraft. Finally, the tracking of another aircraft is simulated when the TCAS-equipped aircraft follows a prescribed escape curve. In short, the computer models developed in this report have generality, completeness and yield reasonable results.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-18
... Internatinal Corp, Comsys, Filter LLC, Excell, Entegee, Chipton-Ross, Ian Martin, Can-Tech, IT Services, IDEX... Internatinal Corp, Comsys, Filter LLC, Excell, Entegee, Chipton-Ross, Ian Martin, Can-Tech, IT Services, IDEX..., Inconen, CTS, Hi-Tec, Woods, Ciber, Kelly Services, Analysts International Corp, Comsys, Filter LLC...
76 FR 5503 - Airworthiness Directives; The Boeing Company Model 777-200 Series Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-01
... software, as applicable; and making a change to the cabin services system (CSS) configuration database and... software, as applicable; and make a change to the cabin services system (CSS) configuration database and... 5 p.m., Monday through Friday, except Federal holidays. For service information identified in this...
2013-07-22
HOUSTON - NASA astronaut Serena Aunon puts on her orange launch-and-entry suit for a fit check evaluation of The Boeing Company's CST-100 spacecraft at the company's Houston Product Support Center. Aunon's fit check will help evaluate a crew's maneuverability in the spacecraft and test communications. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
2013-07-22
HOUSTON - JSC2013e068329 - NASA astronaut Randy Bresnik is interviewed by the media before he enters The Boeing Company's CST-100 spacecraft for a fit check evaluation at the company's Houston Product Support Center. Bresnik's fit check will help evaluate a crew's maneuverability in the spacecraft and test communications. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
2013-07-22
HOUSTON - JSC2013e068264 - NASA astronaut Serena Aunon's boots are covered before she enters The Boeing Company's CST-100 spacecraft for a fit check evaluation at the company's Houston Product Support Center. Aunon's fit check will help evaluate a crew's maneuverability in the spacecraft and test communications. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
Commercial Crew Astronauts Visit Kennedy on This Week @NASA – August 12, 2016
2016-08-12
Two of the NASA astronauts training for the first flight tests for the agency’s Commercial Crew Program visited with employees during an Aug. 11 event at Kennedy Space Center. Astronauts Eric Boe and Suni Williams, alongside Commercial Crew Program Manager Kathy Lueders, responded to questions during a panel discussion, moderated by Kennedy Director Robert Cabana. NASA has contracted with Boeing and SpaceX to develop crew transportation systems and provide crew transportation services to and from the International Space Station. The agency will select the commercial crew astronauts from the group that includes Boe, Williams, Bob Behnken and Doug Hurley The first flight tests are targeted for next year. Also, Air Quality Flight over California Wildfire, CYGNSS Media Day, Putting NASA Earth Science to Work, and more!
New computer program solves wide variety of heat flow problems
NASA Technical Reports Server (NTRS)
Almond, J. C.
1966-01-01
Boeing Engineering Thermal Analyzer /BETA/ computer program uses numerical methods to provide accurate heat transfer solutions to a wide variety of heat flow problems. The program solves steady-state and transient problems in almost any situation that can be represented by a resistance-capacitance network.
Study objectives: Will commercial avionics do the job? Improvements needed?
NASA Technical Reports Server (NTRS)
Nasr, Hatem
1992-01-01
Improvements in commercial avionics are covered in a viewgraph format. Topics include the following: computer architecture, user requirements, Boeing 777 aircraft, cost effectiveness, and implemention.
77 FR 53155 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-31
... this supplemental NPRM. Goodrich Service Bulletin 5A3307-25-389, Revision 2, dated May 4, 2012; and...-389, Revision 2, dated May 4, 2012; and Goodrich Service Bulletin 5A3307-25- 339, Revision 5, dated... of the escape slide specified in Goodrich Service Bulletin 5A3307-25-389, Revision 2, dated May 4...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-08
... evacuating the aircraft. Relevant Service Information We reviewed Goodrich Service Bulletin 5A3307-25-389... certain part numbers, Goodrich Service Bulletin 5A3307-25-389, dated November 8, 2010, specifies... Bulletin 5A3307-25-389, dated November 8, 2010, also specifies concurrent accomplishment of Goodrich...
Industry involvement in IPAD through the Industry Technical Advisory Board
NASA Technical Reports Server (NTRS)
Swanson, W. E.
1980-01-01
In 1976 NASA awarded The Boeing Company a contract to develop IPAD (Integrated Programs for Aerospace-Vehicle Design). This contract included a requirement for Boeing to form an Industrial Technical Advisory Board (ITAB), with members representing major aerospace and computer companies. The purpose of this board was to guide the development of IPAD. The specific goal of IPAD is to increase United States aerospace industry productivity through the application of computers to manage engineering data. This goal clearly is attainable; in fact, IPAD's influence can reach beyond the aerospace industry to many businesses where product development is based on the design-building process. An enhanced IPAD, therefore, is a national asset of significance. The role of ITAB in guiding the development of this system is described.
Broadband Internet Based Service to Passengers and Crew On-board Aircraft
NASA Astrophysics Data System (ADS)
Azzarelli, Tony
2003-07-01
The Connexion by BoeingSM (CbB) global network will provide broadband information services to aircraft passengers and crews. Through this Ku-band (14 GHz (uplink) and 11/12 GHz (downlink)) satellite-based system, aircraft passengers and crew will no longer be limited to pre-packaged services, but instead will be able to access the full range of broadband services from their seats using their laptop, PDA or the on-board IFE console.The kind of services offered to passengers are based on the internet/intranet access via their own laptops and PDA (using Ethernet wired cable, or wireless 802.11b access), while those offered to the crew can range between various crew application (such as weather updates and travel information) and aircraft health monitoring.The CbB system is divided into four basic layers of infrastructure:(1) an airborne segment, i.e. the Aircraft Earth Station (AES) consisting of proprietary high gain antenna, transceivers and other on-board subsystems providing a nominal return link data rate of 1 Mbps and a forward link data rates up to 20 Mbps;(2) a space segment consisting of leased satellite transponders on existing in-orbit Geostationary satellites;(3) a ground segment consisting of one or more leased satellite land earth stations (LESs) and redundant interconnection facilities; and;(4) a network operations centre (NOC) segment.During 2003, trials with Lufthansa (DLH) and British Airways (BA) have proved very successful. This has resulted in the recent signing of an agreement with Lufthansa which calls for the Connexion by BoeingSM service to be installed on Lufthansa's fleet of approximately 80 long-haul aircraft, including Boeing 747-400 and Airbus A330 and A340 aircraft, beginning in early 2004. BA is expected to follow soon. In addition to the successful recent service demonstrations, both Japan Airlines (JAL) and Scandinavian Airlines System (SAS) have announced their intent to install the revolutionary service on their long-range aircraft.
How to Survive in Industry. Cost Justifying Library Services
ERIC Educational Resources Information Center
Kramer, Joseph
1971-01-01
Two services provided by the Boeing Co. Aerospace Group Library-Literature searches and reference/publication identification activities-were evaluated by written and oral surveys of the library's users. The survey technique and cost savings reported by the two studies are discussed. (2 references) (Author/NH)
2013-07-22
HOUSTON - JSC2013e068284 - John Elbon, vice president for Space Exploration for The Boeing Company, addresses the media before the unveiling of a CST-100 mock-up at the company's Houston Product Support Center. This test version is optimized to support five crew members and will allow the company to evaluate crew safety, interfaces, communications, maneuverability and ergonomics. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
2013-07-22
HOUSTON - JSC2013e068296 - John Mulholland, vice president and program manager, Commercial Crew, for The Boeing Company, addresses the media before the unveiling of a CST-100 mock-up at the company's Houston Product Support Center. This test version is optimized to support five crew members and will allow the company to evaluate crew safety, interfaces, communications, maneuverability and ergonomics. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
2013-07-22
HOUSTON - JSC2013e068287 - John Elbon, vice president for Space Exploration for The Boeing Company, addresses the media before the unveiling of a CST-100 mock-up at the company's Houston Product Support Center. This test version is optimized to support five crew members and will allow the company to evaluate crew safety, interfaces, communications, maneuverability and ergonomics. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
2013-07-22
HOUSTON - JSC2013e068248 - Chris Ferguson, director of Crew and Mission Operations for The Boeing Company, is interviewed by the media during the unveiling of a CST-100 mock-up at the company's Houston Product Support Center. This test version is optimized to support five crew members and will allow the company to evaluate crew safety, interfaces, communications, maneuverability and ergonomics. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations, including the International Space Station. Boeing is one of three aerospace industry partners working with CCP during its Commercial Crew Integrated Capability, or CCiCap, initiative, which is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
75 FR 50878 - Airworthiness Directives; McDonnell Douglas Corporation Model MD-90-30 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-18
... support fitting for the MLG failing during gear extension and subsequently damaging the hydraulic system... retract cylinder support fitting for the MLG, which could adversely affect the airplane's safe landing... service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-17
...) being exported are not expected to be used to produce exports or provide services in competition with the exportation of goods or provision of services by a United States industry. Parties: Principal Supplier: The Boeing Company. [[Page 42777
Preliminary analysis of aircraft fuel systems for use with broadened specification jet fuels
NASA Technical Reports Server (NTRS)
Pasion, A. J.; Thomas, I.
1977-01-01
An analytical study was conducted on the use of broadened specification hydrocarbon fuels in present day aircraft. A short range Boeing 727 mission and three long range Boeing 747 missions were used as basis of calculation for one-day-per-year extreme values of fuel loading, airport ambient and altitude ambient temperatures with various seasonal and climatic conditions. Four hypothetical fuels were selected; two high-vapor-pressure fuels with 35 kPa and 70 kPa RVP and two high-freezing-point fuels with -29 C and -18 C freezing points. In-flight fuel temperatures were predicted by Boeing's aircraft fuel tank thermal analyzer computer program. Boil-off rates were calculated for the high vapor pressure fuels and heating/insulation requirements for the high freezing point fuels were established. Possible minor and major heating system modifications were investigated with respect to heat output, performance and economic penalties for the high freezing point fuels.
Control in the cockpit: crews vs. computers.
Ropelewski, R
1996-08-01
In the no-holds-barred competition between Boeing and Europe's Airbus Industrie for dominance in the world's commercial jet airliner markets, the question of who--or what--is in charge in the cockpit has been a significant selling point. Airbus, which pioneered highly automated flight controls with its A320 narrow-body transport in the late 1980s, likes to emphasize the "protection" features built into the aircraft through those automated systems. Boeing, which employs many of the same concepts in its new 777 twin-engine widebody transport, tends to put more emphasis on crew involvement in the operation of that aircraft. Is there a difference? In fact, the question has broader implications than those involving the marketing battle between Boeing and Airbus. Airlines, aircraft manufacturers, flight training specialists, human factors gurus, and aviation authorities in various countries are struggling with the isse as automation becomes more and more prevalent on passenger and cargo-carrying aircraft around the world.
Training over the Intranet--A Shockwave Case Study.
ERIC Educational Resources Information Center
Snydar, Sean
This case study explains how the Boeing Company has used the World Wide Web to deliver flight and maintenance computer-based training (CBT) that was originally created on a Macintosh computer and converted to Windows format. The case study begins with a brief discussion of the advantages of using corporate and institutional internal networks…
2013-07-22
HOUSTON - JSC2013e068304 - Chris Ferguson, director of Crew and Mission Operations for The Boeing Company and former NASA astronaut, is interviewed by the media during the unveiling of a CST-100 mock-up at the company's Houston Product Support Center. This test version is optimized to support five crew members and will allow the company to evaluate crew safety, interfaces, communications, maneuverability and ergonomics. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
2013-07-22
HOUSTON - JSC2013e068310 - Chris Ferguson, director of Crew and Mission Operations for The Boeing Company and former NASA astronaut, discusses the fit check evaluation of the CST-100 mock-up with the media during its unveiling at the company's Houston Product Support Center. This test version is optimized to support five crew members and will allow the company to evaluate crew safety, interfaces, communications, maneuverability and ergonomics. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
2013-07-22
HOUSTON - NASA astronaut Serena Aunon and Andrea Gilkey, a human factors engineer with The Boeing Company, tag up before Aunon puts on her orange launch-and-entry suit for a fit check evaluation of the CST-100 spacecraft at the company's Houston Product Support Center. Aunon's fit check will help evaluate a crew's maneuverability in the spacecraft and test communications. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations, including the International Space Station. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
2013-07-22
HOUSTON - JSC2013e068300 - Chris Ferguson, director of Crew and Mission Operations for The Boeing Company and former NASA astronaut, addresses the media before the unveiling of a CST-100 mock-up at the company's Houston Product Support Center. This test version is optimized to support five crew members and will allow the company to evaluate crew safety, interfaces, communications, maneuverability and ergonomics. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
NASA Technical Reports Server (NTRS)
Cliff, Susan E.; Baker, Timothy J.; Hicks, Raymond M.; Reuther, James J.
1999-01-01
Two supersonic transport configurations designed by use of non-linear aerodynamic optimization methods are compared with a linearly designed baseline configuration. One optimized configuration, designated Ames 7-04, was designed at NASA Ames Research Center using an Euler flow solver, and the other, designated Boeing W27, was designed at Boeing using a full-potential method. The two optimized configurations and the baseline were tested in the NASA Langley Unitary Plan Supersonic Wind Tunnel to evaluate the non-linear design optimization methodologies. In addition, the experimental results are compared with computational predictions for each of the three configurations from the Enter flow solver, AIRPLANE. The computational and experimental results both indicate moderate to substantial performance gains for the optimized configurations over the baseline configuration. The computed performance changes with and without diverters and nacelles were in excellent agreement with experiment for all three models. Comparisons of the computational and experimental cruise drag increments for the optimized configurations relative to the baseline show excellent agreement for the model designed by the Euler method, but poorer comparisons were found for the configuration designed by the full-potential code.
77 FR 41895 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-17
... bushing with a new bushing and deactivation pin, and installing a new or serviceable stowage bracket for... installation of a new bracket for stowing the deactivation pin. We are issuing this AD to prevent failure of... installing a new or serviceable stowage bracket for the deactivation pins on all airplanes powered by Pratt...
Astronauts Bob Behnken and Eric Boe walk the Crew Access Arm at
2017-08-30
Astronauts Bob Behnken, left, and Eric Boe walk down the Crew Access Arm being built by SpaceX for Launch Complex 39A at NASA’s Kennedy Space Center in Florida. The access arm will be installed on the launch pad, providing a bridge between the launch tower it’s the Fixed Service Structure, as noted below, and SpaceX’s Dragon 2 spacecraft for astronauts flying to the International Space Station on the company’s Falcon 9 rocket as part of NASA’s Commercial Crew Program. The access arm is being readied for installation in early 2018. It will be installed 70 feet higher than the former space shuttle access arm on the launch pad’s Fixed Service Structure. SpaceX continues to modify the historic launch site from its former space shuttle days, removing more than 500,000 pounds of steel from the pad structure, including the Rotating Service Structure that was once used for accessing the payload bay of the shuttle. SpaceX also is using the modernized site to launch commercial payloads, as well as cargo resupply missions to and from the International Space Station for NASA. The first SpaceX launch from the historic Apollo and space shuttle site was this past February. NASA’s Commercial Crew Program is working with private companies, Boeing and SpaceX, with a goal of once again flying people to and from the International Space Station, launching from the United States.
Remarks on CFD validation: A Boeing Commercial Airplane Company perspective
NASA Technical Reports Server (NTRS)
Rubbert, Paul E.
1987-01-01
Requirements and meaning of validation of computational fluid dynamics codes are discussed. Topics covered include: validating a code, validating a user, and calibrating a code. All results are presented in viewgraph format.
ISS Logistics Hardware Disposition and Metrics Validation
NASA Technical Reports Server (NTRS)
Rogers, Toneka R.
2010-01-01
I was assigned to the Logistics Division of the International Space Station (ISS)/Spacecraft Processing Directorate. The Division consists of eight NASA engineers and specialists that oversee the logistics portion of the Checkout, Assembly, and Payload Processing Services (CAPPS) contract. Boeing, their sub-contractors and the Boeing Prime contract out of Johnson Space Center, provide the Integrated Logistics Support for the ISS activities at Kennedy Space Center. Essentially they ensure that spares are available to support flight hardware processing and the associated ground support equipment (GSE). Boeing maintains a Depot for electrical, mechanical and structural modifications and/or repair capability as required. My assigned task was to learn project management techniques utilized by NASA and its' contractors to provide an efficient and effective logistics support infrastructure to the ISS program. Within the Space Station Processing Facility (SSPF) I was exposed to Logistics support components, such as, the NASA Spacecraft Services Depot (NSSD) capabilities, Mission Processing tools, techniques and Warehouse support issues, required for integrating Space Station elements at the Kennedy Space Center. I also supported the identification of near-term ISS Hardware and Ground Support Equipment (GSE) candidates for excessing/disposition prior to October 2010; and the validation of several Logistics Metrics used by the contractor to measure logistics support effectiveness.
Nacelle Aerodynamic and Inertial Loads (NAIL) project
NASA Technical Reports Server (NTRS)
1982-01-01
A flight test survey of pressures measured on wing, pylon, and nacelle surfaces and of the operating loads on Boeing 747/Pratt & Whitney JT9D-7A nacelles was made to provide information on airflow patterns surrounding the propulsion system installations and to clarify processes responsible for inservice deterioration of fuel economy. Airloads at takeoff rotation were found to be larger than at any other normal service condition because of the combined effects of high angle of attack and high engine airflow. Inertial loads were smaller than previous estimates indicated. A procedure is given for estimating inlet airloads at low speeds and high angles of attack for any underwing high bypass ratio turbofan installation approximately resembling the one tested. Flight procedure modifications are suggested that may result in better fuel economy retention in service. Pressures were recorded on the core cowls and pylons of both engine installations and on adjacent wing surfaces for use in development of computer codes for analysis of installed propulsion system aerodynamic drag interference effects.
Measured Radiation Patterns of the Boeing 91-Element ICAPA Antenna With Comparison to Calculations
NASA Technical Reports Server (NTRS)
Lambert, Kevin M.; Burke, Thomas (Technical Monitor)
2003-01-01
This report presents measured antenna patterns of the Boeing 91-Element Integrated Circuit Active Phased Array (ICAPA) Antenna at 19.85 GHz. These patterns were taken in support of various communication experiments that were performed using the antenna as a testbed. The goal here is to establish a foundation of the performance of the antenna for the experiments. An independent variable used in the communication experiments was the scan angle of the antenna. Therefore, the results presented here are patterns as a function of scan angle, at the stated frequency. Only a limited number of scan angles could be measured. Therefore, a computer program was written to simulate the pattern performance of the antenna at any scan angle. This program can be used to facilitate further study of the antenna. The computed patterns from this program are compared to the measured patterns as a means of validating the model.
Integrated testing and verification system for research flight software design document
NASA Technical Reports Server (NTRS)
Taylor, R. N.; Merilatt, R. L.; Osterweil, L. J.
1979-01-01
The NASA Langley Research Center is developing the MUST (Multipurpose User-oriented Software Technology) program to cut the cost of producing research flight software through a system of software support tools. The HAL/S language is the primary subject of the design. Boeing Computer Services Company (BCS) has designed an integrated verification and testing capability as part of MUST. Documentation, verification and test options are provided with special attention on real time, multiprocessing issues. The needs of the entire software production cycle have been considered, with effective management and reduced lifecycle costs as foremost goals. Capabilities have been included in the design for static detection of data flow anomalies involving communicating concurrent processes. Some types of ill formed process synchronization and deadlock also are detected statically.
76 FR 21815 - Airworthiness Directives; The Boeing Company Model 737 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-19
...)(c) of this service bulletin provides instructions to check for obvious differences in thread shape between thread grooves ``as given in CMM 27-41-01.'' Air Tran noted that CMM 27-41-01 does not provide any... have revised this AD to refer to the new service information. We agree that processes referred to by...
Revisiting the Boeing B-47 and the Avro Vulcan with implications on aircraft design today
NASA Astrophysics Data System (ADS)
van Seeters, Philip A.
This project compares the cruise mission performance of the historic Boeing B-47 and Avro Vulcan. The author aims to demonstrate that despite superficial similarities, these aircraft perform quite differently away from their intended design points. The investigation uses computer aided design software, and an aircraft sizing program to generate digital models of both airplanes. Subsequent simulations of various missions quantify the performance mainly in terms of fuel efficiency, and productivity. Based on this comparison, the efforts conclude that these aircraft perform indeed differently, and that a performance comparison based on a design mission alone, is insufficient.
2013-09-04
LAS VEGAS, Nev. – Engineers prepare a mock-up of The Boeing Company's CST-100 spacecraft for the third and final series of simulated contingency water landing scenarios at Bigelow Aerospace's headquarters near Las Vegas. The CST-100 is designed for ground landings, but could splash down on the water, if necessary. The tests are part of the company’s ongoing work supporting its funded Space Act Agreement with NASA’s Commercial Crew Program, or CCP, during the Commercial Crew Integrated Capability, or CCiCap, initiative. CCP is intended to lead to the availability of commercial human spaceflight services for government and commercial customers to low-Earth orbit. Future development and certification initiatives eventually will lead to the availability of human spaceflight services for NASA to send its astronauts to the International Space Station, where critical research is taking place daily. For more information about CCP, go to http://www.nasa.gov/commercialcrew. Photo credit: Boeing/Kelly George
2013-09-04
LAS VEGAS, Nev. – A mock-up of The Boeing Company's CST-100 spacecraft is prepared for the third and final series of simulated contingency water landing scenarios at Bigelow Aerospace's headquarters near Las Vegas. The CST-100 is designed for ground landings, but could splash down on the water, if necessary. The tests are part of the company’s ongoing work supporting its funded Space Act Agreement with NASA’s Commercial Crew Program, or CCP, during the Commercial Crew Integrated Capability, or CCiCap, initiative. CCP is intended to lead to the availability of commercial human spaceflight services for government and commercial customers to low-Earth orbit. Future development and certification initiatives eventually will lead to the availability of human spaceflight services for NASA to send its astronauts to the International Space Station, where critical research is taking place daily. For more information about CCP, go to http://www.nasa.gov/commercialcrew. Photo credit: Boeing/Kelly George
2013-09-04
LAS VEGAS, Nev. – An engineer prepares a mock-up of The Boeing Company's CST-100 spacecraft for the third and final series of simulated contingency water landing scenarios at Bigelow Aerospace's headquarters near Las Vegas. The CST-100 is designed for ground landings, but could splash down on the water, if necessary. The tests are part of the company’s ongoing work supporting its funded Space Act Agreement with NASA’s Commercial Crew Program, or CCP, during the Commercial Crew Integrated Capability, or CCiCap, initiative. CCP is intended to lead to the availability of commercial human spaceflight services for government and commercial customers to low-Earth orbit. Future development and certification initiatives eventually will lead to the availability of human spaceflight services for NASA to send its astronauts to the International Space Station, where critical research is taking place daily. For more information about CCP, go to http://www.nasa.gov/commercialcrew. Photo credit: Boeing/Kelly George
2013-09-04
LAS VEGAS, Nev. – A mock-up of The Boeing Company's CST-100 spacecraft floats following the third and final series of simulated contingency water landing scenarios at Bigelow Aerospace's headquarters near Las Vegas. The CST-100 is designed for ground landings, but could splash down on the water, if necessary. The tests are part of the company’s ongoing work supporting its funded Space Act Agreement with NASA’s Commercial Crew Program, or CCP, during the Commercial Crew Integrated Capability, or CCiCap, initiative. CCP is intended to lead to the availability of commercial human spaceflight services for government and commercial customers to low-Earth orbit. Future development and certification initiatives eventually will lead to the availability of human spaceflight services for NASA to send its astronauts to the International Space Station, where critical research is taking place daily. For more information about CCP, go to http://www.nasa.gov/commercialcrew. Photo credit: Boeing/Kelly George
Unmanned Bomber: The Effects It Will Bring to the Nuclear Triad
2014-06-01
New York, NY: Avery Trade, 2011), 41. 16 Boeing, History of B-2 Spirit , http://www.boeing.com/boeing/history/boeing/ b2 .page retrieved on January...factsheets/start1 retrieved on February 23, 2014 Boeing, History of B-2 Spirit , http://www.boeing.com/boeing/history/boeing/ b2 .page retrieved on
Computer Assets Recovery Project
NASA Technical Reports Server (NTRS)
CortesPena, Aida Yoguely
2010-01-01
This document reports on the project that was performed during the internship of the author. The project involved locating and recovering machines in various locations that Boeing has no need for, and therefore requires that they be transferred to another user or transferred to a non-profit organization. Other projects that the author performed was an inventory of toner and printers, loading new computers and connecting them to the network.
Three Generations of Tracking and Data Relay Satellite (TDRS) Spacecraft
NASA Technical Reports Server (NTRS)
Zaleski, Ron
2016-01-01
The current Tracking and Data Relay Satellite configuration consists of nine in-orbit satellites (four first generation, three second generation and two third generation satellites) globally distributed in geosynchronous orbit to provide near continuous data relay service to missions like Hubble Space Telescope and the International Space Station. The 1st generation spacecraft were designed by TRW/Northrop Grumman with their launches of the five spacecraft ranging from 1983 through 1995. The 2nd and 3rd generation spacecraft were designed by Boeing with their launches ranging 2000 - 2002 and 2013 - 2017 respectively. TDRS-3 is now 27 years on orbit, continues to be a capable asset for the TDRS constellation. Lack of need for inclination control combined with large fuel reserves and redundancy on critical elements provides spacecraft that operate well past design life, all of which contributes to expanded TDRS constellation support capabilities. All spacecraft generations have issues. Significant issues will be summarized with the focus on the Boeing related problems. Degradations and failures are continually assessed and provide the foundation for yearly updates to spacecraft reliability models, constellation service projections and deorbit plans (in order to meet NASAs mandate of limiting orbital debris). Even when accounting for degradations and failures, the life expectancy for the Boeing delivered 2nd generation TDRS-8, 9 10 TDRS are anticipated to be 25+ years.
First NASA/Industry High-Speed Research Configuration Aerodynamics Workshop
NASA Technical Reports Server (NTRS)
Wood, Richard M. (Editor)
1999-01-01
This publication is a compilation of documents presented at the First NASA/Industry High Speed Research Configuration Aerodynamics Workshop held on February 27-29, 1996 at NASA Langley Research Center. The purpose of the workshop was to bring together the broad spectrum of aerodynamicists, engineers, and scientists working within the Configuration Aerodynamics element of the HSR Program to collectively evaluate the technology status and to define the needs within Computational Fluid Dynamics (CFD) Analysis Methodology, Aerodynamic Shape Design, Propulsion/Airframe Integration (PAI), Aerodynamic Performance, and Stability and Control (S&C) to support the development of an economically viable High Speed Civil Transport (HSCT) aircraft. To meet these objectives, papers were presented by representative from NASA Langley, Ames, and Lewis Research Centers; Boeing, McDonnell Douglas, Northrop-Grumman, Lockheed-Martin, Vigyan, Analytical Services, Dynacs, and RIACS.
NASA Technical Reports Server (NTRS)
Moynihan, Gary P.
1992-01-01
In June 1991, the MITRE Corporation submitted a series of recommendations as part of a Marshall Space Flight Center (MSFC) Management Information System Requirements Study, initiated by the Information Systems Office (ISO). A major recommendation of the study was to develop an Executive Information System (EIS) for MSFC executives. ISO was directed, by center management, to proceed with the development of a Center-Wide Executive Information System. Existing EIS prototypes, developed by the Space Shuttle Projects Office and the Payload Projects Office, were reviewed. These existing MSFC prototypes were considered not to encompass the required functionality needed on a center-wide basis. A follow-up study by MITRE provided top-level system requirements. These were later incorporated into a final requirements specification document by Boeing Computer Support Services.
First NASA/Industry High-Speed Research Configuration Aerodynamics Workshop. Pt. 2
NASA Technical Reports Server (NTRS)
Wood, Richard M. (Editor)
1999-01-01
This publication is a compilation of documents presented at the First NASA Industry High Speed Research Configuration Aerodynamics Workshop held on February 27-29, 1996 at NASA Langley Research Center. The purpose of the workshop was to bring together the broad spectrum of aerodynamicists, engineers, and scientists working within the Configuration Aerodynamics element of the HSR Program to collectively evaluate the technology status and to define the needs within Computational Fluid Dynamics (CFD) Analysis Methodology, Aerodynamic Shape Design, Propulsion/Airframe Integration (PAI), Aerodynamic Performance, and Stability and Control (S&C) to support the development of an economically viable High Speed Civil Transport (HSCT) aircraft. To meet these objectives, papers were presented by representatives from NASA Langley, Ames, and Lewis Research Centers; Boeing, McDonnell Douglas, Northrop-Grumman, Lockheed-Martin, Vigyan, Analytical Services, Dynacs, and RIACS.
First NASA/Industry High-Speed Research Configuration Aerodynamics Workshop. Part 1
NASA Technical Reports Server (NTRS)
Wood, Richard M. (Editor)
1999-01-01
This publication is a compilation of documents presented at the First NASA/Industry High Speed Research Configuration Aerodynamics Workshop held on February 27-29, 1996 at NASA Langley Research Center. The purpose of the workshop was to bring together the broad spectrum of aerodynamicists, engineers, and scientists working within the Configuration Aerodynamics element of the HSR Program to collectively evaluate the technology status and to define the needs within Computational Fluid Dynamics (CFD) Analysis Methodology, Aerodynamic Shape Design, Propulsion/Airframe Integration (PAI), Aerodynamic Performance, and Stability and Control (S&C) to support the development of an economically viable High Speed Civil Transport (HSCT) aircraft. To meet these objectives, papers were presented by representative from NASA Langley, Ames, and Lewis Research Centers; Boeing, McDonnell Douglas, Northrop-Grumman, Lockheed-Martin, Vigyan, Analytical Services, Dynacs, and RIACS.
Software-Defined Avionics and Mission Systems in Future Vertical Lift Aircraft
2015-03-01
military rotorcraft in the service of the United States Joint services have yet to benefit significantly from this technology. At long last, that may...Despite the demonstrated success of IMA systems in commercial airliners such as the Airbus A380 and the Boeing 787, military rotorcraft in the...8 4. Integrated Modular Avionics (IMA) – Generation One ..................9 5. Military IMA
Practical quality control tools for curves and surfaces
NASA Technical Reports Server (NTRS)
Small, Scott G.
1992-01-01
Curves (geometry) and surfaces created by Computer Aided Geometric Design systems in the engineering environment must satisfy two basic quality criteria: the geometric shape must have the desired engineering properties; and the objects must be parameterized in a way which does not cause computational difficulty for geometric processing and engineering analysis. Interactive techniques are described which are in use at Boeing to evaluate the quality of aircraft geometry prior to Computational Fluid Dynamic analysis, including newly developed methods for examining surface parameterization and its effects.
Boeing's CST-100 Launch Abort Engine Test
2016-10-10
Boeing and Aerojet Rocketdyne have begun a series of developmental hot-fire tests with two launch abort engines similar to the ones that will be part of Boeing’s CST-100 Starliner service module, in the Mojave Desert in California. The engines, designed to maximize thrust build-up, while minimizing overshoot during start up, will be fired between half a second and 3 seconds each during the test campaign. If the Starliner’s four launch abort engines were used during an abort scenario, they would fire between 3 and 5.5. seconds, with enough thrust to get the spacecraft and its crew away from the rocket, before splashing down in the ocean under parachutes.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Boeing workers help guide a section of the fairing into place around the Swift spacecraft inside the mobile service tower on Launch Pad 17-A, Cape Canaveral Air Force Station. The fairing is being installed around the payload for protection during launch and ascent. A Boeing Delta II rocket is the launch vehicle for the Swift spacecraft and its Gamma-Ray Burst Mission. Swift is a first-of-its-kind multi-wavelength observatory dedicated to the study of gamma-ray burst science. Its three instruments will work together to observe GRBs and afterglows in the gamma ray, X-ray, ultraviolet and optical wavebands. Swift is scheduled to launch Nov. 17 at 12:09 p.m. EST.
2007-06-23
The Space Shuttle Atlantis receives post-flight servicing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center, Edwards, California, June 22, 2007. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft.
Extending a Flight Management Computer for Simulation and Flight Experiments
NASA Technical Reports Server (NTRS)
Madden, Michael M.; Sugden, Paul C.
2005-01-01
In modern transport aircraft, the flight management computer (FMC) has evolved from a flight planning aid to an important hub for pilot information and origin-to-destination optimization of flight performance. Current trends indicate increasing roles of the FMC in aviation safety, aviation security, increasing airport capacity, and improving environmental impact from aircraft. Related research conducted at the Langley Research Center (LaRC) often requires functional extension of a modern, full-featured FMC. Ideally, transport simulations would include an FMC simulation that could be tailored and extended for experiments. However, due to the complexity of a modern FMC, a large investment (millions of dollars over several years) and scarce domain knowledge are needed to create such a simulation for transport aircraft. As an intermediate alternative, the Flight Research Services Directorate (FRSD) at LaRC created a set of reusable software products to extend flight management functionality upstream of a Boeing-757 FMC, transparently simulating or sharing its operator interfaces. The paper details the design of these products and highlights their use on NASA projects.
78 FR 60673 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-02
...-140, 1200 New Jersey Avenue SE., Washington, DC 20590. FOR FURTHER INFORMATION CONTACT: Ray Mei...) Related Information For more information about this AD, contact Ray Mei, Aerospace Engineer, Systems and...://www.myboeingfleet.com . (4) You may view this service information at FAA, Transport Airplane...
NASA Technical Reports Server (NTRS)
Magee, Todd E.; Wilcox, Peter A.; Fugal, Spencer R.; Acheson, Kurt E.; Adamson, Eric E.; Bidwell, Alicia L.; Shaw, Stephen G.
2013-01-01
This report describes the work conducted by The Boeing Company under American Recovery and Reinvestment Act (ARRA) and NASA funding to experimentally validate the conceptual design of a supersonic airliner feasible for entry into service in the 2018 to 2020 timeframe (NASA N+2 generation). The report discusses the design, analysis and development of a low-boom concept that meets aggressive sonic boom and performance goals for a cruise Mach number of 1.8. The design is achieved through integrated multidisciplinary optimization tools. The report also describes the detailed design and fabrication of both sonic boom and performance wind tunnel models of the low-boom concept. Additionally, a description of the detailed validation wind tunnel testing that was performed with the wind tunnel models is provided along with validation comparisons with pretest Computational Fluid Dynamics (CFD). Finally, the report describes the evaluation of existing NASA sonic boom pressure rail measurement instrumentation and a detailed description of new sonic boom measurement instrumentation that was constructed for the validation wind tunnel testing.
2009-06-25
CAPE CANAVERAL, Fla. – A prelaunch news conference on the Geostationary Operational Environmental Satellite-O mission is held in NASA's Kennedy Space Center press site auditorium. From left, the participants are George H. Diller, moderator, Media Services, Kennedy Space Center; Gary Davis, director, Office of Systems Development, NOAA Satellite and Information Service, Suitland, Md.; Kris Walsh, Commercial Programs manager, United Launch Alliance, Houston; Kevin Reyes, director, Business Development, Boeing Launch Services; Andre Dress, GOES-O deputy project manager, Goddard Space Flight Center; Charlie Maloney, GOES-O program manager, Boeing Space and Intelligence Systems, Seal Beach, Calif.; Bart Hagemeyer, meteorologist in charge, NOAA National Weather Service forecast office, Melbourne, Fla.; and Joel Tumbiolo, Delta IV launch weather officer, 45th Weather Squadron, Cape Canaveral Air Force Station. The GOES-O satellite is targeted to launch June 26. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. Each of the GOES satellites continuously provides observations of 60 percent of the Earth including the continental United States, providing weather monitoring and forecast operations as well as a continuous and reliable stream of environmental information and severe weather warnings. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. Photo credit: NASA/Jim Grossmann
On display during a technical exposition at Dryden are NASA's B-52 launch aircraft, Boeing's X-37, B
NASA Technical Reports Server (NTRS)
2000-01-01
Aerospace industry representatives view actual and mock-up versions of 'X-Planes' intended to enhance access to space during a technical exposition on June 22, 2000 at Dryden Flight Research Center, Edwards, California. From left to right: NASA's B-52 launch aircraft, in service with NASA since 1959; a neutral-buoyancy model of the Boeing's X-37; the Boeing X-40A behind the MicroCraft X-43 mock-up; Orbital Science's X-34 and the modified Lockheed L-1011 airliner that was to launch the X-34. These X-vehicles are part of NASA's Access to Space plan intended to bring new technologies to bear in an effort to dramatically lower the cost of putting payloads in space, and near-space environments. The June 22, 2000 NASA Reusable Launch Vehicle (RLV) Technology Exposition included presentations on the history, present, and future of NASA's RLV program. Special Sessions for industry representatives highlighted the X-37 project and its related technologies. The X-37 project is managed by NASA's Marshall Space Flight Center, Huntsville, Alabama.
Boeing's Dart and Starliner Parachute System Test
2018-02-22
Boeing conducted the first in a series of reliability tests of its CST-100 Starliner flight drogue and main parachute system by releasing a long, dart-shaped test vehicle from a C-17 aircraft over Yuma, Arizona. Two more tests are planned using the dart module, as well as three similar reliability tests using a high fidelity capsule simulator designed to simulate the CST-100 Starliner capsule’s exact shape and mass. In both the dart and capsule simulator tests, the test spacecraft are released at various altitudes to test the parachute system at different deployment speeds, aerodynamic loads, and or weight demands. Data collected from each test is fed into computer models to more accurately predict parachute performance and to verify consistency from test to test.
Overview of Low-Speed Aerodynamic Tests on a 5.75% Scale Blended-Wing-Body Twin Jet Configuration
NASA Technical Reports Server (NTRS)
Vicroy, Dan D.; Dickey, Eric; Princen, Norman; Beyar, Michael D.
2016-01-01
The NASA Environmentally Responsible Aviation (ERA) Project sponsored a series of computational and experimental investigations of the propulsion and airframe integration issues associated with Hybrid-Wing-Body (HWB) or Blended-Wing-Body (BWB) configurations. NASA collaborated with Boeing Research and Technology (BR&T) to conduct this research on a new twin-engine Boeing BWB transport configuration. The experimental investigations involved a series of wind tunnel tests with a 5.75-percent scale model conducted in two low-speed wind tunnels. This testing focused on the basic aerodynamics of the configuration and selection of the leading edge Krueger slat position for takeoff and landing. This paper reviews the results and analysis of these low-speed wind tunnel tests.
75 FR 8279 - Airworthiness Directives; The Boeing Company Model 747 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-24
... airplanes. The original NPRM would have superseded an existing AD that currently requires repetitive... inspection of the modified area. The original NPRM proposed to continue to require those actions using revised service information. For certain airplanes, the original NPRM proposed to require new repetitive...
78 FR 63135 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-23
... system. The NPRM also proposed to require replacing the operational program software of certain... condition would not be adequately addressed by the proposed action. The manufacturer has issued new service... software of certain indicating/recording systems. The NPRM was prompted by numerous operator reports of...
2013-08-21
LAS CRUCES, N.M. – A thruster glows red during a hot-fire test for Boeing’s CST-100 spacecraft orbital maneuvering and attitude control OMAC system. During the tests at NASA’s White Sands Test Facility in Las Cruces, N.M., Boeing and partner Aerojet Rocketdyne tested two thrusters to demonstrate stable combustion and performance in a vacuum, simulating a space environment. Two additional thrusters were tested in a vacuum to demonstrate long-duration mission survivability. The 24 thrusters that compose the CST-100’s OMAC system will be jettisoned with the service module after the deorbit burn, prior to re-entry. The tests completed Milestone 9 of the company's funded Space Act Agreement with NASA’s Commercial Crew Program, or CCP, during the Commercial Crew Integrated Capability, or CCiCap, initiative. CCP is intended to lead to the availability of commercial human spaceflight services for government and commercial customers to low-Earth orbit. Future development and certification initiatives eventually will lead to the availability of human spaceflight services for NASA to send its astronauts to the International Space Station, where critical research is taking place daily. For more information about CCP, go to http://www.nasa.gov/commercialcrew. Photo credit: Boeing
30 CFR 203.86 - What is in a G&G report?
Code of Federal Regulations, 2014 CFR
2014-07-01
... establishing reservoir porosity or labeled points showing values used in calculating reservoir porosity such as... BOE) and oil fraction for your field computed by the resource module of our RSVP model; (2) A description of anticipated hydrocarbon quality (i.e., specific gravity); and (3) The ranges within the...
30 CFR 203.86 - What is in a G&G report?
Code of Federal Regulations, 2013 CFR
2013-07-01
... establishing reservoir porosity or labeled points showing values used in calculating reservoir porosity such as... BOE) and oil fraction for your field computed by the resource module of our RSVP model; (2) A description of anticipated hydrocarbon quality (i.e., specific gravity); and (3) The ranges within the...
30 CFR 203.86 - What is in a G&G report?
Code of Federal Regulations, 2012 CFR
2012-07-01
... establishing reservoir porosity or labeled points showing values used in calculating reservoir porosity such as... BOE) and oil fraction for your field computed by the resource module of our RSVP model; (2) A description of anticipated hydrocarbon quality (i.e., specific gravity); and (3) The ranges within the...
77 FR 31758 - Airworthiness Directives; the Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-30
.... That NPRM proposed to inspect for part numbers of the operational program software of the flight... operational program software (OPS) of the flight control computers (FCC), and doing corrective actions if... previous NPRM (75 FR 57885, September 23, 2010), we have determined that the software installation required...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-15
... design features associated with the architecture and connectivity capabilities of the airplane's computer... novel or unusual design features: digital systems architecture composed of several connected networks. The architecture and network configuration may be used for, or interfaced with, a diverse set of...
Eigenvalue routines in NASTRAN: A comparison with the Block Lanczos method
NASA Technical Reports Server (NTRS)
Tischler, V. A.; Venkayya, Vipperla B.
1993-01-01
The NASA STRuctural ANalysis (NASTRAN) program is one of the most extensively used engineering applications software in the world. It contains a wealth of matrix operations and numerical solution techniques, and they were used to construct efficient eigenvalue routines. The purpose of this paper is to examine the current eigenvalue routines in NASTRAN and to make efficiency comparisons with a more recent implementation of the Block Lanczos algorithm by Boeing Computer Services (BCS). This eigenvalue routine is now available in the BCS mathematics library as well as in several commercial versions of NASTRAN. In addition, CRAY maintains a modified version of this routine on their network. Several example problems, with a varying number of degrees of freedom, were selected primarily for efficiency bench-marking. Accuracy is not an issue, because they all gave comparable results. The Block Lanczos algorithm was found to be extremely efficient, in particular, for very large size problems.
Requirements for Kalman filtering on the GE-701 whole word computer
NASA Technical Reports Server (NTRS)
Pines, S.; Schmidt, S. F.
1978-01-01
The results of a study to determine scaling, storage, and word length requirements for programming the Kalman filter on the GE-701 Whole Word Computer are reported. Simulation tests are presented which indicate that the Kalman filter, using a square root formulation with process noise added, utilizing MLS, radar altimeters, and airspeed as navigation aids, may be programmed for the GE-701 computer to successfully navigate and control the Boeing B737-100 during landing approach, landing rollout, and turnoff. The report contains flow charts, equations, computer storage, scaling, and word length recommendations for the Kalman filter on the GE-701 Whole Word computer.
77 FR 54856 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-06
... Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, Washington 98124-2207... (14 CFR part 121); part 125 (``Certification and Operations: Airplanes Having a Seating Capacity of 20...-Demand Operations and Rules Governing Persons On Board Such Aircraft'') of the FARs (14 CFR part 135...
78 FR 46538 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-01
... because of those comments. We will post all comments we receive, without change, to http://www.regulations.gov , including any personal information you provide. We will also post a report summarizing each... Service Bulletin 727-28-0134, dated January 12, 2012; and Critical Design Configuration Control Limitation...
76 FR 3054 - Airworthiness Directives; The Boeing Company Model 777 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-19
... Airplanes, Attention: Data & Services Management, P. O. Box 3707, MC 2H-65, Seattle, Washington 98124-2207... after receipt. FOR FURTHER INFORMATION CONTACT: Duong Tran, Aerospace Engineer, Airframe Branch, ANM...: Comments Invited We invite you to send any written relevant data, views, or arguments about this proposal...
77 FR 34876 - Airworthiness Directives; The Boeing Company
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-12
... (a flammable fluid leakage zone) or heat damage to the APU power feeder cable, insulation blankets... heat damage to the APU power feeder cable, insulation blankets, or pressure bulkhead. Relevant Service... feeder cable and heat damage of the insulation blanket adjacent to the clamp, a detailed inspection for...
77 FR 29857 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-21
... of cabin pressurization and the inability of the fuselage to withstand fail-safe loads. DATES: This... cabin pressurization and the inability of the fuselage to withstand fail-safe loads. (f) Compliance You... reference of certain publications listed in the AD as of June 25, 2012. ADDRESSES: For service information...
2007-06-25
Lit by sunlight filtered through the smoke of a distant forest fire, the Space Shuttle Atlantis receives post-flight servicing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center, Edwards, California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft.
Space Station Common Berthing Mechanism, a multi-body simulation application
NASA Technical Reports Server (NTRS)
Searle, Ian
1993-01-01
This paper discusses an application of multi-body dynamic analysis conducted at the Boeing Company in connection with the Space Station (SS) Common Berthing Mechanism (CBM). After introducing the hardware and analytical objectives we will focus on some of the day-to-day computational issues associated with this type of analysis.
NASA Technical Reports Server (NTRS)
Strash, D. J.; Summa, J. M.
1996-01-01
In the work reported herein, a simplified, uncoupled, zonal procedure is utilized to assess the capability of numerically simulating icing effects on a Boeing 727-200 aircraft. The computational approach combines potential flow plus boundary layer simulations by VSAERO for the un-iced aircraft forces and moments with Navier-Stokes simulations by NPARC for the incremental forces and moments due to iced components. These are compared with wind tunnel force and moment data, supplied by the Boeing Company, examining longitudinal flight characteristics. Grid refinement improved the local flow features over previously reported work with no appreciable difference in the incremental ice effect. The computed lift curve slope with and without empennage ice matches the experimental value to within 1%, and the zero lift angle agrees to within 0.2 of a degree. The computed slope of the un-iced and iced aircraft longitudinal stability curve is within about 2% of the test data. This work demonstrates the feasibility of a zonal method for the icing analysis of complete aircraft or isolated components within the linear angle of attack range. In fact, this zonal technique has allowed for the viscous analysis of a complete aircraft with ice which is currently not otherwise considered tractable.
2004-10-08
KENNEDY SPACE CENTER, FLA. - In the mobile service tower at Launch Pad 17-A on Cape Canaveral Air Force Station, workers attach the upper second stage to the lower first stage of the Boeing Delta II launch vehicle. The rocket is the launch vehicle for the Swift spacecraft and its Gamma-Ray Burst Mission, now scheduled for liftoff Nov. 8. Swift is a medium-class Explorer mission managed by NASA’s Goddard Space Flight Center in Greenbelt, Md. It is a first-of-its-kind multi-wavelength observatory dedicated to the study of gamma-ray burst (GRB) science. Its three instruments will work together to observe GRBs and afterglows in the gamma ray, X-ray, ultraviolet and optical wavebands. KSC is responsible for Swift’s integration with the Boeing Delta II rocket and the countdown management on launch day.
Ground breaking at Astrotech for a new facility
NASA Technical Reports Server (NTRS)
1999-01-01
Dirt flies during a ground-breaking ceremony to kick off Astrotech Space Operations' construction of a new satellite preparation facility to support the Delta IV, Boeing's winning entrant in the Air Force Evolved Expendable Launch Vehicle (EELV) Program. Wielding shovels are (from left to right) Tom Alexico; Chet Lee, chairman, Astrotech Space Operations; Gen. Forrest McCartney, vice president, Launch Operations, Lockheed Martin; Richard Murphy, director, Delta Launch Operations, The Boeing Company; Keith Wendt; Toby Voltz; Loren Shriver, deputy director, Launch & Payload Processing, Kennedy Space Center; Truman Scarborough, Brevard County commissioner; U.S. Representative 15th Congressional District David Weldon; Ron Swank; and watching the action at right is George Baker, president, Astrotech Space Operations. Astrotech is located in Titusville, Fla. It is a wholly owned subsidiary of SPACEHAB, Inc., and has been awarded a 10-year contract to provide payload processing services for The Boeing Company. The facility will enable Astrotech to support the full range of satellite sizes planned for launch aboard Delta II, III and IV launch vehicles, as well as the Atlas V, Lockheed Martin's entrant in the EELV Program. The Atlas V will be used to launch satellites for government, including NASA, and commercial customers.
Boeing Satellite Television Airplane Receiving System (STARS) performance
NASA Technical Reports Server (NTRS)
Vertatschitsch, Edward J.; Fitzsimmons, George W.
1995-01-01
Boeing Defense and Space Group is developing a Satellite Television Airplane Receiving System (STARS) capable of delivering Direct Broadcast Satellite (DBS) television to an aircraft in-flight. This enables a new service for commercial airplanes that will make use of existing and future DBS systems. The home entertainment satellites, along with STARS, provide a new mobile satellite communication application. This paper will provide a brief background of the antenna issues associated with STARS for commercial airplanes and then describe the innovative Boeing phased-array solution to these problems. The paper then provides a link budget of the STARS using the Hughes DBS as an example, but the system will work with all of the proposed DBS satellites in the 12.2-12.7 GHz band. It concludes with operational performance calculations of the STARS system, supported by measured test data of an operational 16-element subarray. Although this system is being developed for commercial airplanes, it is well suited for a wide variety of mobile military and other commercial communications systems in air, on land and at sea. The applications include sending high quality video for the digital battlefield and large volumes of data on the information superhighway at rates in excess of 350 Mbps.
NASA Technical Reports Server (NTRS)
Cappuccio, Gelsomina
1999-01-01
Experiments were conducted in the NASA Ames 9-Ft by 7-Ft Supersonic and 11-Ft by 11-Ft Transonic Wind Tunnels of a 2.7% Reference H (Ref. H) Nacelle Airframe Interference (NAI) High Speed Civil Transport (HSCT) model. NASA Ames did the experiment with the cooperation and assistance of Boeing and McDonnell Douglas. The Ref. H geometry was designed by Boeing. The model was built and tested by NASA under a license agreement with Boeing. Detailed forces and pressures of individual components of the configuration were obtained to assess nacelle airframe interference through the transonic and supersonic flight regime. The test apparatus was capable of measuring forces and pressures of the Wing body (WB) and nacelles. Axisymmetric and 2-D inlet nacelles were tested with the WB in both the in-proximity and captive mode. The in-proximity nacelles were mounted to a nacelle support system apparatus and were individually positioned. The right hand nacelles were force instrumented with flow through strain-gauged balances and the left hand nacelles were pressure instrumented. Mass flow ratio was varied to get steady state inlet unstart data. In addition, supersonic spillage data was taken by testing the 2-D inlet nacelles with ramps and the axisymmetric inlet nacelles with an inlet centerbody for the Mach condition of interest. The captive nacelles, both axisymmetric and 2-D, were attached to the WB via diverters. The captive 2-D inlet nacelle was also tested with ramps to get supersonic spillage data. Boeing analyzed the data and showed a drag penalty of four drag counts for the 2-D compared with the axisymmetric inlet nacelle. Two of the four counts were attributable to the external bevel designed into the 2-D inlet contour. Boeing and McDonnell Douglas used these data for evaluating Computational Fluid Dynamic (CFD) codes and for evaluation of nacelle airframe integration problems and solutions.
78 FR 39571 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-02
... 2800, Aircraft Fuel System. (e) Unsafe Condition This AD was prompted by reports of two in-service... system, followed by loss of fuel system suction feed capability on one engine, and in-flight shutdown of... and correct loss of the engine fuel suction feed capability of the fuel system, which, in the event of...
76 FR 62663 - Airworthiness Directives; The Boeing Company Model 767 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-11
..., West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590. Hand Delivery: U.S. Department of Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12... Airplanes, Attention: Data & Services Management, P. O. Box 3707, MC 2H-65, Seattle, Washington 98124-2207...
77 FR 33619 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-07
..., and doing related investigative and corrective actions if necessary. This new AD adds an [[Page 33620... or service door to open fully in the event of an emergency evacuation, which could impede exit from... necessary. That NPRM also proposed to add an airplane to the applicability and also remove certain other...
77 FR 64242 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-19
... plc, P.O. Box 31, Derby, DE24 8BJ, United Kingdom; telephone 011 44 1332 242424; fax 011 44 1332... . For Bombardier service information identified in this proposed AD, contact Short Brothers PLC... investigation into the nature, cause, and extent of the cracking. If final action is later identified, based on...
75 FR 43097 - Airworthiness Directives; The Boeing Company Model 757 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-23
... must be sealed for lightning strike protection. Relevant Service Information AD 2008-23-19 referred to... additional fasteners in the main fuel tanks must be sealed for lightning strike protection. The Federal... bundles inside the left and right equipment cooling system bays, on the left and right rear spars, and on...
76 FR 78805 - Airworthiness Directives; Rolls-Royce plc (RR) RB211-Trent 800 Series Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-20
... rejected fuel tubes need to be replaced to avoid fuel leaks. Delta indicated that the On- wing Inspection... Revision Number Three commenters, American Airlines (American), Delta Airlines (Delta), and the Boeing... Revisions of the Service Bulletin One commenter, Delta, asked that engines previously inspected per Revision...
78 FR 19093 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-29
... doing a general visual inspection of the housing assembly of the packboard release mechanism to determine if its surface treatment has been sealed, and if the surface of the housing assembly is unsealed, replacing the housing assembly with a new or serviceable housing assembly. We are issuing this AD to detect...
76 FR 30043 - Airworthiness Directives; The Boeing Company Model 757 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-24
... requires doing an additional adjustment test of the re-located control wheel position sensor, and an... service information specifies doing an operational test of the spoiler/speedbrake control system. These... and Bond 12 work-hours x $85 per 0 1,020 699,720 Tests, Groups 1-5 Configuration 2. hour = $1,020...
77 FR 10406 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-22
... powered by Pratt & Whitney JT9D series engines require installation of a new bracket for stowing the... serviceable stowage bracket for the deactivation pins on all airplanes powered by Pratt & Whitney JT9D series... Pratt & Whitney JT9D series engines require installation of a new bracket for stowing the deactivation...
78 FR 61173 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-03
..., Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, Washington 98124-2207; telephone....regulations.gov ; or in person at the Docket Management Facility between 9 a.m. and 5 p.m., Monday through... Management Facility, U.S. Department of Transportation, Docket Operations, M-30, West Building Ground Floor...
77 FR 24357 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-24
... tubes, and actuator control electronics. In the event of a lightning strike, loss of lightning ground... ; Internet https://www.myboeingfleet.com . You may review copies of the referenced service information at the... availability of this material at the FAA, call 425-227-1221. Examining the AD Docket You may examine the AD...
78 FR 25905 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
... that the frame-to-floor beam attachment is subject to widespread fatigue damage (WFD). This proposed AD... fatigue cracking at the frame-to-floor beam attachment, on both the left- and right-sides, which could... between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. For service information...
78 FR 48835 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-12
... action. We are proposing this AD to prevent fatigue cracking of the tension ties, which could result in... between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. For service information... Management Facility between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD docket...
78 FR 33012 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-03
... to detect and correct fatigue cracks in the fuselage skin that can propagate and grow, and result in... 5 p.m., Monday through Friday, except Federal holidays. For service information identified in this... between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD docket contains this...
78 FR 47235 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-05
... revenue flight cycles. These parts were then installed into engines and introduced into revenue service... cycle counts of those LLPs to account for the additional low cycle fatigue (LCF) life consumed during... Boeing 747-8 flight tests had consumed more cyclic life than they would have in revenue flight cycles...
NASA Technical Reports Server (NTRS)
Schoen, A. H.; Rosenstein, H.; Stanzione, K.; Wisniewski, J. S.
1980-01-01
This report describes the use of the V/STOL Aircraft Sizing and Performance Computer Program (VASCOMP II). The program is useful in performing aircraft parametric studies in a quick and cost efficient manner. Problem formulation and data development were performed by the Boeing Vertol Company and reflects the present preliminary design technology. The computer program, written in FORTRAN IV, has a broad range of input parameters, to enable investigation of a wide variety of aircraft. User oriented features of the program include minimized input requirements, diagnostic capabilities, and various options for program flexibility.
NASA Technical Reports Server (NTRS)
Vos, R. G.; Straayer, J. W.
1975-01-01
The BOPACE 3-D is a finite element computer program, which provides a general family of three-dimensional isoparametric solid elements, and includes a new algorithm for improving the efficiency of the elastic-plastic-creep solution procedure. Theoretical, user, and programmer oriented sections are presented to describe the program.
Brake control system modification, augmentor Wing Jet STOL Research Airplane (AWJSRA)
NASA Technical Reports Server (NTRS)
Amberg, R. L.; Arline, J. A.; Jenny, R. W.
1974-01-01
The braking system for a short takeoff aircraft is discussed and the deficiencies are described. The installation of a Boeing 727 aircraft brake system was made to correct the deficiencies. Tests of the modified system were conducted using an analog computer/hardware simulator. Actual performance tests were conducted and the characteristics of the system were satisfactory.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-17
... director computers. This AD results from reports of rejected takeoffs at speeds above takeoff decision speed following inadvertent autopilot engagement on the ground, and from the discovery during flight... takeoff roll, which could result in rejected takeoff at rotation speed, and consequent possible overrun of...
Measurement and analysis of solar cell current-voltage characteristics
NASA Technical Reports Server (NTRS)
Olsen, Larry C.; Addis, F. William; Doyle, Dan H.; Miller, Wesley A.
1985-01-01
Approaches to measurement and analysis of solar cell current-voltage characteristics under dark and illuminated conditions are discussed. Measurements are taken with a computer based data acquisition system for temperatures in the range of -100 to +100 C. In the fitting procedure, the various I(oi) and C(i) as well as R(S) and R(SH) are determined. Application to current-voltage analyses of high efficiency silicon cells and Boeing CdS/CuInSe2 are discussed. In silicon MINP cells, it is found that at low voltages a tunneling mechanism is dominant, while at larger voltages the I-V characteristics are usually dominated by emitter recombination. In the case of Boeing cells, a current transport model based on a tunneling mechanism and interface recombination acting in series has been developed as a result of I-V analyses.
Wind-US Users Guide Version 3.0
NASA Technical Reports Server (NTRS)
Yoder, Dennis A.
2016-01-01
Wind-US is a computational platform which may be used to numerically solve various sets of equations governing physical phenomena. Currently, the code supports the solution of the Euler and Navier-Stokes equations of fluid mechanics, along with supporting equation sets governing turbulent and chemically reacting flows. Wind-US is a product of the NPARC Alliance, a partnership between the NASA Glenn Research Center (GRC) and the Arnold Engineering Development Complex (AEDC) dedicated to the establishment of a national, applications-oriented flow simulation capability. The Boeing Company has also been closely associated with the Alliance since its inception, and represents the interests of the NPARC User's Association. The "Wind-US User's Guide" describes the operation and use of Wind-US, including: a basic tutorial; the physical and numerical models that are used; the boundary conditions; monitoring convergence; the files that are read and/or written; parallel execution; and a complete list of input keywords and test options. For current information about Wind-US and the NPARC Alliance, please see the Wind-US home page at http://www.grc.nasa.gov/WWW/winddocs/ and the NPARC Alliance home page at http://www.grc.nasa.gov/WWW/wind/. This manual describes the operation and use of Wind-US, a computational platform which may be used to numerically solve various sets of equations governing physical phenomena. Wind-US represents a merger of the capabilities of four CFD codes - NASTD (a structured grid flow solver developed at McDonnell Douglas, now part of Boeing), NPARC (the original NPARC Alliance structured grid flow solver), NXAIR (an AEDC structured grid code used primarily for store separation analysis), and ICAT (an unstructured grid flow solver developed at the Rockwell Science Center and Boeing).
Model Development and Model-Based Control Design for High Performance Nonlinear Smart Systems
2007-11-20
potentially impact a broad range of flow control problems of interest to the Air Force and Boeing. Point of contact: James Mabe , Boeing Phantom Works...rotorcraft blades. In both cases, models and control designs will be validated using data from Boeing experiments and flight tests. Point of contact: James ... Mabe , Boeing Phantom Works, Seattle, WA, 206-655-0091. 3. PZT Unimorphs – Boeing: Nonlinear structural models developed through AFOSR support are being
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-17
... ground, uncontained fuel leakage could result in pooling, and pooling combined with an ignition source... Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, Washington 98124-2207... Management Facility, U.S. Department of Transportation, Docket Operations, M-30, West Building Ground Floor...
77 FR 26945 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-08
... span the station (STA) 521.45 ``stay-out zone.'' This AD requires for certain airplanes, replacing the... Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, Washington 98124-2207... LOPA for those B/E Aerospace seats does not have a seat leg fitting that spans the STA 521.45 ``stay...
78 FR 26233 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-06
... Replace fire seal (up to 4) 8 work-hours x $85 per hour = 8,010 8,690 $680. Authority for This Rulemaking... ``New Service Information'' section above: ``Labor cost'' increased to 28 work-hours (14 hours per.... Action Labor cost Parts cost product operators General visual inspection and 28 work-hours x $85 per $2...
77 FR 64704 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-23
... airplanes of total loss of boost pump pressure of the fuel feed system, followed by loss of fuel system... the engine fuel suction feed capability of the fuel system, which, in the event of total loss of the... Airplanes, Attention: Data & Services Management, P. O. Box 3707, MC 2H-65, Seattle, WA 98124-2207...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-01
... determine the manufacturer and manufacture date of the oxygen masks in the passenger service unit and the... in-line flow indicators of the passenger oxygen masks from fracturing and separating, which could inhibit oxygen flow to the masks and consequently result in exposure of the passengers and cabin...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-28
... http://www.exim.gov/articles.cfm/board%20minute . Confidential Information: Please note that this... items being exported: To be sub-leased to SpiceJet for short- and medium-haul passenger air service in... Items Being Exported: Boeing 737 aircraft. Information on Decision: Information on the final decision...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-05
....S. manufactured commercial aircraft to Israel. Brief non-proprietary description of the anticipated use of the items being exported: To be used for short-haul passenger air service between Israel and... AL Israel Airlines, Ltd. Guarantor(s): N/A. Description of Items Being Exported: Boeing 737 aircraft...
2013-07-22
HOUSTON - JSC2013e068324 - Kathy Lueders, NASA deputy manager for the Commercial Crew Program, is interviewed by the media during the unveiling of a CST-100 mock-up at the company's Houston Product Support Center. This test version is optimized to support five crew members and will allow the company to evaluate crew safety, interfaces, communications, maneuverability and ergonomics. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
2013-07-22
HOUSTON - JSC2013e068290 - Kathy Lueders, NASA deputy manager for the Commercial Crew Program, addresses the media before the unveiling of a CST-100 mock-up at the company's Houston Product Support Center. This test version is optimized to support five crew members and will allow the company to evaluate crew safety, interfaces, communications, maneuverability and ergonomics. Boeing's CST-100 is being designed to transport crew members or a mix of crew and cargo to low-Earth-orbit destinations. The evaluation is part of the ongoing work supporting Boeing's funded Space Act Agreement with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative. CCiCap is intended to make commercial human spaceflight services available for government and commercial customers. To learn more about CCP, visit http://www.nasa.gov/commercialcrew. Photo credit: NASA/Robert Markowitz
2004-10-08
KENNEDY SPACE CENTER, FLA. - At Launch Pad 17-A on Cape Canaveral Air Force Station, the second stage of the Boeing Delta II launch vehicle is ready to be lifted up the mobile service tower for mating with the first stage. The rocket is the launch vehicle for the Swift spacecraft and its Gamma-Ray Burst Mission, now scheduled for liftoff Nov. 8. Swift is a medium-class Explorer mission managed by NASA’s Goddard Space Flight Center in Greenbelt, Md. It is a first-of-its-kind multi-wavelength observatory dedicated to the study of gamma-ray burst (GRB) science. Its three instruments will work together to observe GRBs and afterglows in the gamma ray, X-ray, ultraviolet and optical wavebands. KSC is responsible for Swift’s integration with the Boeing Delta II rocket and the countdown management on launch day.
2004-10-08
KENNEDY SPACE CENTER, FLA. - At Launch Pad 17-A on Cape Canaveral Air Force Station, the second stage of the Boeing Delta II launch vehicle is being lifted up the mobile service tower for mating with the first stage. The rocket is the launch vehicle for the Swift spacecraft and its Gamma-Ray Burst Mission, now scheduled for liftoff Nov. 8. Swift is a medium-class Explorer mission managed by NASA’s Goddard Space Flight Center in Greenbelt, Md. It is a first-of-its-kind multi-wavelength observatory dedicated to the study of gamma-ray burst (GRB) science. Its three instruments will work together to observe GRBs and afterglows in the gamma ray, X-ray, ultraviolet and optical wavebands. KSC is responsible for Swift’s integration with the Boeing Delta II rocket and the countdown management on launch day.
Technology transfer personnel exchange at the Boeing Company
DOE Office of Scientific and Technical Information (OSTI.GOV)
Antoniak, Z.I.
1993-03-01
The objective of the exchange was to transfer Pacific Northwest Laboratory (PNL) technology and expertise in advanced ceramic fabric composites (ACFC) to the Boeing Defense & Space Group (Boeing Aerospace). Boeing Aerospace was especially interested in applying PNL-developed ACFC technology to its current and future spacecraft and space missions. Boeing has on-going independent research and development (R&D) programs on advanced radiators and heat pipes, therefore, PNL research in ceramic fabric heat pipes was of particular interest to Boeing. Thus, this exchange assisted in the transfer of PNL`s ACFC heat pipe technology and other, related research capabilities to private industrial application.more » The project was proposed as an initial step in building a long-term collaborative relationship between Boeing and PNL that may result in future Cooperative Research and Development Agreements (CRADAs) and/or other types of collaborative efforts.« less
Technology transfer personnel exchange at the Boeing Company
DOE Office of Scientific and Technical Information (OSTI.GOV)
Antoniak, Z.I.
1993-03-01
The objective of the exchange was to transfer Pacific Northwest Laboratory (PNL) technology and expertise in advanced ceramic fabric composites (ACFC) to the Boeing Defense Space Group (Boeing Aerospace). Boeing Aerospace was especially interested in applying PNL-developed ACFC technology to its current and future spacecraft and space missions. Boeing has on-going independent research and development (R D) programs on advanced radiators and heat pipes, therefore, PNL research in ceramic fabric heat pipes was of particular interest to Boeing. Thus, this exchange assisted in the transfer of PNL's ACFC heat pipe technology and other, related research capabilities to private industrial application.more » The project was proposed as an initial step in building a long-term collaborative relationship between Boeing and PNL that may result in future Cooperative Research and Development Agreements (CRADAs) and/or other types of collaborative efforts.« less
75 FR 22514 - Airworthiness Directives; The Boeing Company Model 747-200B Series Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-29
... airplanes that were modified by Boeing to the stretched upper deck (SUD) configuration require inspection... airplanes that were modified by Boeing to the stretched upper deck (SUD) configuration require inspecting... modified to the stretched upper deck (SUD) configuration by Boeing require inspection for cracking of the...
Barotrauma in Boeing 737 cabin crew.
Kortschot, H W; Oosterveld, W J
1993-01-01
Several aircrew members of a Boeing 737 aircraft were referred to our department because they suffered from a barotrauma. The fast rate of pressure change during the descent of a Boeing 737 aircraft, as compared to the Boeing 747, DC-10 and Airbus 310 aircrafts, is most likely the cause of the development of the barotraumata.
Zapata-Morales, Juan Ramón; Alonso-Castro, Angel Josabad; Domínguez, Fabiola; Carranza-Álvarez, Candy; Isiordia-Espinoza, Mario; Hernández-Morales, Alejandro; Solorio-Alvarado, Cesar
2017-07-31
Bidens odorata Cav (Asteraceae) is used for the empirical treatment of inflammation and pain. This work evaluated the in vitro and in vivo toxicity, antioxidant activity, as well as the anti-inflammatory and antinociceptive effects of an ethanol extract from Bidens odorata leaves (BOE). The in vitro toxicity of BOE (10-1000µg/ml) was evaluated with the comet assay in PBMC. The in vivo acute toxicity of BOE (500-5000mg/kg) and the effect of BOE (10-1000µg/ml) on the level of ROS in PBMC were determined. The in vivo anti-inflammatory activity of BOE was assessed using the TPA-induced ear edema in mice. The antinociceptive activities of BOE (50-200mg/kg p.o.) were assessed using the acetic acid and formalin tests. The antinociceptive mechanism of BOE was determined using naloxone and glibenclamide. BOE lacked DNA damage, and showed low in vivo toxicity (LD 50 > 5000mg/kg p.o.). BOE inhibited ROS production (IC 50 = 252.13 ± 20.54µg/ml), and decreased inflammation by 36.1 ± 3.66%. In both antinociceptive test, BOE (200mg/kg) exerted activity with similar activity than the reference drugs. B. odorata exerts low in vitro and in vivo toxicity, antioxidant effects, moderate in vivo anti-inflammatory activity, and antinociceptive effects mediated by ATP-sensitive K + channels. Copyright © 2017 Elsevier Ireland Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Moody, Marc; Fisher, Robert; Little, J. Kristin
2014-06-01
Boeing has developed a degraded visual environment navigational aid that is flying on the Boeing AH-6 light attack helicopter. The navigational aid is a two dimensional software digital map underlay generated by the Boeing™ Geospatial Embedded Mapping Software (GEMS) and fully integrated with the operational flight program. The page format on the aircraft's multi function displays (MFD) is termed the Approach page. The existing work utilizes Digital Terrain Elevation Data (DTED) and OpenGL ES 2.0 graphics capabilities to compute the pertinent graphics underlay entirely on the graphics processor unit (GPU) within the AH-6 mission computer. The next release will incorporate cultural databases containing Digital Vertical Obstructions (DVO) to warn the crew of towers, buildings, and power lines when choosing an opportune landing site. Future IRAD will include Light Detection and Ranging (LIDAR) point cloud generating sensors to provide 2D and 3D synthetic vision on the final approach to the landing zone. Collision detection with respect to terrain, cultural, and point cloud datasets may be used to further augment the crew warning system. The techniques for creating the digital map underlay leverage the GPU almost entirely, making this solution viable on most embedded mission computing systems with an OpenGL ES 2.0 capable GPU. This paper focuses on the AH-6 crew interface process for determining a landing zone and flying the aircraft to it.
SPARSKIT: A basic tool kit for sparse matrix computations
NASA Technical Reports Server (NTRS)
Saad, Youcef
1990-01-01
Presented here are the main features of a tool package for manipulating and working with sparse matrices. One of the goals of the package is to provide basic tools to facilitate the exchange of software and data between researchers in sparse matrix computations. The starting point is the Harwell/Boeing collection of matrices for which the authors provide a number of tools. Among other things, the package provides programs for converting data structures, printing simple statistics on a matrix, plotting a matrix profile, and performing linear algebra operations with sparse matrices.
Tashkin, D P; Coulson, A H; Simmons, M S; Spivey, G H
1983-01-01
The smaller size and lighter weight of the Boeing 747SP aircraft, introduced into passenger service in 1976, permitted higher-altitude flight than older commercial aircraft and thus potentially greater ozone exposure for those of board. Concerned flight attendants distributed questionnaires relating to symptoms experienced on the Boeing 747SP and/or conventional 747 aircraft to Los Angeles- and New York-based flight attendants. Respondents reported symptoms by frequency and severity and by in-flight and after-flight occurrence. Based on the assessment of three health scientists as to ozone-relatedness, the frequency of "definite" and "probable" ozone-related symptoms of any severity reported by both groups of attendants was significantly associated with 747SP flights (chi-squares: P less than 0.05). After-flight symptoms significantly associated with 747SP experience, although fewer in number than in-flight symptoms, were all in the scientists' "definite" category. In 21 flight attendants who complained of moderate to severe symptoms during 747SP flights, a battery of pulmonary function tests performed approximately two weeks after their last 747SP flight failed to reveal abnormalities. The symptom questionnaire results are consistent with possible exposure of cabin attendants to toxic levels of ozone during the higher-altitude flights of the Boeing 747SP compared to conventional 747 aircraft.
Model of spacecraft atomic oxygen and solar exposure microenvironments
NASA Technical Reports Server (NTRS)
Bourassa, R. J.; Pippin, H. G.
1993-01-01
Computer models of environmental conditions in Earth orbit are needed for the following reasons: (1) derivation of material performance parameters from orbital test data, (2) evaluation of spacecraft hardware designs, (3) prediction of material service life, and (4) scheduling spacecraft maintenance. To meet these needs, Boeing has developed programs for modeling atomic oxygen (AO) and solar radiation exposures. The model allows determination of AO and solar ultraviolet (UV) radiation exposures for spacecraft surfaces (1) in arbitrary orientations with respect to the direction of spacecraft motion, (2) overall ranges of solar conditions, and (3) for any mission duration. The models have been successfully applied to prediction of experiment environments on the Long Duration Exposure Facility (LDEF) and for analysis of selected hardware designs for deployment on other spacecraft. The work on these models has been reported at previous LDEF conferences. Since publication of these reports, a revision has been made to the AO calculation for LDEF, and further work has been done on the microenvironments model for solar exposure.
A knowledge based software engineering environment testbed
NASA Technical Reports Server (NTRS)
Gill, C.; Reedy, A.; Baker, L.
1985-01-01
The Carnegie Group Incorporated and Boeing Computer Services Company are developing a testbed which will provide a framework for integrating conventional software engineering tools with Artifical Intelligence (AI) tools to promote automation and productivity. The emphasis is on the transfer of AI technology to the software development process. Experiments relate to AI issues such as scaling up, inference, and knowledge representation. In its first year, the project has created a model of software development by representing software activities; developed a module representation formalism to specify the behavior and structure of software objects; integrated the model with the formalism to identify shared representation and inheritance mechanisms; demonstrated object programming by writing procedures and applying them to software objects; used data-directed and goal-directed reasoning to, respectively, infer the cause of bugs and evaluate the appropriateness of a configuration; and demonstrated knowledge-based graphics. Future plans include introduction of knowledge-based systems for rapid prototyping or rescheduling; natural language interfaces; blackboard architecture; and distributed processing
Aeronautical Research Engineer Milt Thompson computing data
NASA Technical Reports Server (NTRS)
1956-01-01
Milton O. Thompson was hired as an engineer at the National Advisory Committee for Aeronautics' High-Speed Flight Station (later renamed the National Aeronautics and Space Administration's Dryden Flight Research Center) on March 19, 1956. In 1958 he became a research pilot, but in this photo Milt is working on data from another pilot's research flight. Thompson began flying with the U.S. Navy as a pilot trainee at the age of 19. He subsequently served during World War II, with duty in China and Japan. Following six years of active naval service, he entered the University of Washington, in Seattle, Washington. Milt graduated in 1953 with a Bachelor of Science degree in Engineering. He remained in the Naval Reserves during college, and continued flying--not only naval aircraft but crop dusters and forest-spraying aircraft. After college graduation, Milt became a flight test engineer for the Boeing Aircraft Company in Seattle, where he was employed for two years before coming to the High-Speed Flight Station.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-01
...; Special Conditions No. 25-438-SC] Special Conditions: Boeing, Model 747-8 Series Airplanes; Door 1... conditions. SUMMARY: These special conditions are issued for Boeing Model 747-8 airplanes. These airplanes... Federal Regulations (14 CFR) 21.101, Boeing must show that the Model 747-8 (hereafter referred as 747-8...
Sonic Boom Minimization Efforts on Boeing HSCT Baseline
NASA Technical Reports Server (NTRS)
Cheung, Samson H.; Fouladi, Kamran; Haglund, George; Tu, Eugene
1999-01-01
A team was formed to tackle the sonic boom softening issues of the current Boeing HSCT design. The team consisted of personnel from NASA Ames, NASA Langley, and Boeing company. The work described in this paper was done when the first author was at NASA Ames Research Center. This paper presents the sonic boom softening work on two Boeing High Speed Civil Transport (HSCT) baseline configurations, Reference-H and Boeing-1122. This presentation can be divided into two parts: parametric studies and sonic boom minimization by CFD optimization routines.
Eric Boe and Bob Behnken Dragon Tour
2017-03-08
Astronaut Bob Behnken emerges from the top hatch of a SpaceX Crew Dragon spacecraft in manufacturing at SpaceX's headquarters and factory in Hawthorne, California, as astronaut Eri Boe looks on. Behnken and Boe are two of four NASA astronauts selected to train with Boeing and SpaceX ahead of flight tests for NASA's Commercial Crew Program. Along with Behnken and Boe, Doug Hurley and Suni Williams are working with the companies on their independent spacecraft and launch vehicles being developed to take astronauts to the International Space Station. Photo credit: SpaceX
Terminal configured vehicle program: Test facilities guide
NASA Technical Reports Server (NTRS)
1980-01-01
The terminal configured vehicle (TCV) program was established to conduct research and to develop and evaluate aircraft and flight management system technology concepts that will benefit conventional take off and landing operations in the terminal area. Emphasis is placed on the development of operating methods for the highly automated environment anticipated in the future. The program involves analyses, simulation, and flight experiments. Flight experiments are conducted using a modified Boeing 737 airplane equipped with highly flexible display and control equipment and an aft flight deck for research purposes. The experimental systems of the Boeing 737 are described including the flight control computer systems, the navigation/guidance system, the control and command panel, and the electronic display system. The ground based facilities used in the program are described including the visual motion simulator, the fixed base simulator, the verification and validation laboratory, and the radio frequency anechoic facility.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-23
...: 202-493-2251. Mail: U.S. Department of Transportation, Docket Operations, M-30, West Building Ground... of Transportation, Docket Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New Jersey..., Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, Washington 98124-2207; telephone...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-24
... and corrosion to an area within five inches of the fail-safe strap. Revision 2 of this service.... The existing AD currently requires inspections to detect cracking or corrosion of the fail-safe straps... corrective actions. Since we issued that AD, we have received additional reports of cracks in 51 fail-safe...
Air Force KC-X Tanker Aircraft Program: Background and Issues for Congress
2009-10-05
General ..................................................................................................................... 12 Best Value vs . Lowest...Druyan was a single “bad apple ” and that her actions did not negate the merits of leasing Boeing 767s for use as tankers. In February 2005, however...Force KC-X Tanker Aircraft Program: Background and Issues for Congress Congressional Research Service 17 Best Value vs . Lowest Cost The question of
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-28
... at a later date, for short- and medium-haul passenger air service in East Asia, South Asia, and/or... Trading Limited. Guarantor(s): N/A. Description of Items Being Exported Boeing 737 aircraft. Information on Decision: Information on the final decision for this transaction will be available in the...
STS-92 - Discovery Fly-away - return to Florida
2000-11-02
Carrying the Space Shuttle Discovery piggyback, one of NASA’s modified Boeing 747 Shuttle Carrier Aircraft lifts off the runway at Edwards Air Force Base, California. The Discovery was ferried from NASA’s Dryden Flight Research Center at Edwards to NASA’s Kennedy Space Center in Florida on November 2, 2000, after extensive post-landing servicing and ferry flight preparations.
Recent advances in aerospace composite NDE
NASA Astrophysics Data System (ADS)
Georgeson, Gary E.
2002-06-01
As the aerospace industry continues to advance the design and use of composite structure, the NDE community faces the difficulties of trying to keep up. The challenges lie in manufacturing evaluation of the newest aerospace structures and materials and the in-service inspection and monitoring of damaged or aging composites. This paper provides examples of several promising NDI applications in the world of aerospace composites. Airborne (or non-contact) Ultrasonic Testing (UT) has been available for decades, but recently has generated new interest due to significant improvements in transducer design and low noise electronics. Boeing is developing inspection techniques for composite joints and core blankets using this technology. In-service inspection techniques for thick, multi-layer structures are also being advanced. One effective technique integrates the S-9 Sondicator, a traditional bond testing device, with Boeing's Mobile Automated Scanner (MAUS) platform. Composite patches have seen limited use on-aircraft, due, in part, to the difficulty of determining the quality of a bonded joint. A unique approach using Electronic Speckle Pattern Interferometry (ESPI) is showing promise as a bonded patch-inspection method. Other NDI techniques currently being developed for aerospace application are also briefly discussed.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-06
... Building 535 Garden Avenue North, Renton, Washington and 10-18 Building 635 Park Avenue North, Renton... include workers at the 10-16 Building 535 Garden Avenue North, Renton, Washington and 10-18 Building 635... Garden Avenue North and 10-18 Building 635 Park Avenue North, Renton, Washington (TA-W-82,705C), The...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-10
...; Notice No. 25-11-12-SC] Special Conditions: Boeing, Model 747-8 Series Airplanes; Door 1 Extendable... special conditions. SUMMARY: This action proposes special conditions for the Boeing Model 747-8 airplane... Boeing Company applied for an amendment to Type Certificate Number A20WE to include the Model 747-8...
The Boeing 747 fatigue integrity program
NASA Technical Reports Server (NTRS)
Spencer, M. M.
1972-01-01
The fatigue integrity program which was established to insure economic operations and to provide foundation data for inspection and maintenance is discussed. Significant features of the 747 fatigue integrity program are: (1) fatigue analyses which are continually updated to reflect design changes, fatigue test results, and static and flight load survey measurements; (2) material selection and detail design by using initial fatigue analyses, service experience, and testing; and (3) fatigue testing to check detail design quality and to verify the analyses, culminated by the test of a structurally complete airframe. Fatigue stress analyses were performed with the aid of experimental as well as analytical procedures. Extensive application was made of the stress severity factor, developed at Boeing, for evaluating peak stresses in complex joints. A frame of reference was established by families of structural fatigue performance curves (S-N curves) encompassing the range of materials and fatigue qualities anticipated for the 747 airplane design.
2013-07-12
CAPE CANAVERAL, Fla. -- This graphic depicts the patriotic endeavor of NASA's three Commercial Crew Program, or CCP, partners. The Boeing Company of Houston, Sierra Nevada Corporation, or SNC, of Louisville, Colo., and Space Exploration Technologies, or SpaceX, of Hawthorne, Calif., are working under the agency's Commercial Crew Integrated Capability, or CCiCap, initiative and Certification Products Contract, or CPC, phase to develop spaceflight capabilities that eventually could provide launch services to transport NASA astronauts to the International Space Station from U.S. soil. Shown along the bottom, from left, are: Boeing's integrated CST-100 spacecraft and United Launch Alliance, or ULA, Atlas V rocket SNC's integrated Dream Chaser spacecraft and Atlas V and SpaceX's integrated Dragon spacecraft and Falcon 9 rocket. In the center are artist depictions of company spacecraft in orbit. At the top is NASA's destination for crew transportation in low-Earth orbit, the International Space Station. For more information, visit www.nasa.gov/commercialcrew. Image credit: NASA
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-01
... Airworthiness Directives; The Boeing Company Model 747-100, 747- 100B, 747-100B SUD, 747-200B, 747-200C, 747... airplanes, we have reviewed Subsection D, ``AIRWORTHINESS LIMITATIONS--FUEL SYSTEMS,'' of Boeing 747-400... as did Subsection D, ``AIRWORTHINESS LIMITATIONS-- FUEL SYSTEMS,'' of Boeing 747-400 MPD Document...
The Integrated Mode Management Interface
NASA Technical Reports Server (NTRS)
Hutchins, Edwin
1996-01-01
Mode management is the processes of understanding the character and consequences of autoflight modes, planning and selecting the engagement, disengagement and transitions between modes, and anticipating automatic mode transitions made by the autoflight system itself. The state of the art is represented by the latest designs produced by each of the major airframe manufacturers, the Boeing 747-400, the Boeing 777, the McDonnell Douglas MD-11, and the Airbus A320/A340 family of airplanes. In these airplanes autoflight modes are selected by manipulating switches on the control panel. The state of the autoflight system is displayed on the flight mode annunciators. The integrated mode management interface (IMMI) is a graphical interface to autoflight mode management systems for aircraft equipped with flight management computer systems (FMCS). The interface consists of a vertical mode manager and a lateral mode manager. Autoflight modes are depicted by icons on a graphical display. Mode selection is accomplished by touching (or mousing) the appropriate icon. The IMMI provides flight crews with an integrated interface to autoflight systems for aircraft equipped with flight management computer systems (FMCS). The current version is modeled on the Boeing glass-cockpit airplanes (747-400, 757/767). It runs on the SGI Indigo workstation. A working prototype of this graphics-based crew interface to the autoflight mode management tasks of glass cockpit airplanes has been installed in the Advanced Concepts Flight Simulator of the CSSRF of NASA Ames Research Center. This IMMI replaces the devices in FMCS equipped airplanes currently known as mode control panel (Boeing), flight guidance control panel (McDonnell Douglas), and flight control unit (Airbus). It also augments the functions of the flight mode annunciators. All glass cockpit airplanes are sufficiently similar that the IMMI could be tailored to the mode management system of any modern cockpit. The IMMI does not replace the functions of the FMCS control and display unit. The purpose of the INMI is to provide flight crews with a shared medium in which they can assess the state of the autoflight system, take control actions on it, reason about its behavior, and communicate with each other about its behavior. The design is intended to increase mode awareness and provide a better interface to autoflight mode management. This report describes the IMMI, the methods that were used in designing and developing it, and the theory underlying the design and development processes.
CFD-Based Design Optimization Tool Developed for Subsonic Inlet
NASA Technical Reports Server (NTRS)
1995-01-01
The traditional approach to the design of engine inlets for commercial transport aircraft is a tedious process that ends with a less-than-optimum design. With the advent of high-speed computers and the availability of more accurate and reliable computational fluid dynamics (CFD) solvers, numerical optimization processes can effectively be used to design an aerodynamic inlet lip that enhances engine performance. The designers' experience at Boeing Corporation showed that for a peak Mach number on the inlet surface beyond some upper limit, the performance of the engine degrades excessively. Thus, our objective was to optimize efficiency (minimize the peak Mach number) at maximum cruise without compromising performance at other operating conditions. Using a CFD code NPARC, the NASA Lewis Research Center, in collaboration with Boeing, developed an integrated procedure at Lewis to find the optimum shape of a subsonic inlet lip and a numerical optimization code, ADS. We used a GRAPE-based three-dimensional grid generator to help automate the optimization procedure. The inlet lip shape at the crown and the keel was described as a superellipse, and the superellipse exponents and radii ratios were considered as design variables. Three operating conditions: cruise, takeoff, and rolling takeoff, were considered in this study. Three-dimensional Euler computations were carried out to obtain the flow field. At the initial design, the peak Mach numbers for maximum cruise, takeoff, and rolling takeoff conditions were 0.88, 1.772, and 1.61, respectively. The acceptable upper limits on the takeoff and rolling takeoff Mach numbers were 1.55 and 1.45. Since the initial design provided by Boeing was found to be optimum with respect to the maximum cruise condition, the sum of the peak Mach numbers at takeoff and rolling takeoff were minimized in the current study while the maximum cruise Mach number was constrained to be close to that at the existing design. With this objective, the optimum design satisfied the upper limits at takeoff and rolling takeoff while retaining the desirable cruise performance. Further studies are being conducted to include static and cross-wind operating conditions in the design optimization procedure. This work was carried out in collaboration with Dr. E.S. Reddy of NYMA, Inc.
78 FR 20229 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-04
... Airworthiness Directives; The Boeing Company Airplanes AGENCY: Federal Aviation Administration (FAA), DOT... Boeing Company Model 737-600, -700, -700C, -800, -900, and -900ER series airplanes. That AD currently... 20231
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-07
... Airworthiness Limitations inspections (ALIs). This AD results from a design review of the fuel tank systems. We... inspections (ALIs). Relevant Service Information We reviewed Boeing DC-8 Special Compliance Item Report, MDC..., Revision C, dated January 5, 2010; or Revision D, dated June 9, 2010. (2) ALI 30-1 ``DC-8 Pneumatic System...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-05
... thumbnail fairing edge seals on both sides of the engines with Nitronic 60 stainless steel alloy seals. This proposed AD was prompted by reports of excessive in-service wear damage of the thumbnail fairing edge seal... failure of the fire seal, which could allow a fire in the fan compartment to spread beyond the firewall...
NASA Technical Reports Server (NTRS)
1984-01-01
New Automated Management Information Center (AMIC) employs innovative microcomputer techniques to create color charts, viewgraphs, or other data displays in a fraction of the time formerly required. Developed under Kennedy Space Center's contract by Boeing Services International Inc., Seattle, WA, AMIC can produce an entirely new informational chart in 30 minutes, or an updated chart in only five minutes. AMIC also has considerable potential as a management system for business firms.
2005-01-01
market segment. Manufacturers are putting considerable effort into creating new models and upgrading current products for the high-end corporate...market share. Both competitors have new products entering the market with the Airbus A380 due around 2006, and the Boeing 787 scheduled for service in...commonality on all systems and technologies. First production models are expected to be delivered in 2008. Initial operating capability (IOC) for the U.S
Informing the Long-Term Learner Model: Motivating the Adult Learner (Phase 1)
2017-09-28
and reporting to good people, third was training opportunities, and fourth was work– life balance. Salary fell ninth on the list (Ng et al. 2010). A...Elizabeth Lameier University of Central Florida, Institute for Simulation and Training , Orlando, FL Elizabeth Biddle The Boeing Company, Orlando...including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services , Directorate for Information Operations and
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-08
..., Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, Washington 98124-2207; telephone... paragraph. Note 1: For the purposes of this AD, a detailed inspection is defined as: ``An intensive visual... below the chem-milled step. If an external doubler covers the chem-milled step, but does not span it by...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-18
.... This proposed AD results from a structural review of affected skin lap joints for widespread fatigue damage. We are proposing this AD to prevent fatigue cracking in certain lap joints, which could result in...., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. For service...
STS-92 - Orbiter in Mate-Demate Device (MDD) - closeup view from front
2000-10-29
The Space Shuttle Discovery is centered in the Mate-Demate Device (MDD) at NASA’s Dryden Flight Research Center at Edwards, California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA’s modified Boeing 747 Shuttle Carrier Aircraft.
STS-92 - Discovery Fly-away - return to Florida
2000-11-02
One of NASA’s two modified Boeing 747 Shuttle Carrier Aircraft with the Space Shuttle orbiter Discovery on its back climbs out after takeoff from Edwards Air Force Base, California. The Discovery was ferried from NASA’s Dryden Flight Research Center at Edwards to NASA’s Kennedy Space Center in Florida on November 2, 2000, after extensive post-landing servicing and ferry flight preparations.
A brief overview of NASA Langley's research program in formal methods
NASA Technical Reports Server (NTRS)
1992-01-01
An overview of NASA Langley's research program in formal methods is presented. The major goal of this work is to bring formal methods technology to a sufficiently mature level for use by the United States aerospace industry. Towards this goal, work is underway to design and formally verify a fault-tolerant computing platform suitable for advanced flight control applications. Also, several direct technology transfer efforts have been initiated that apply formal methods to critical subsystems of real aerospace computer systems. The research team consists of six NASA civil servants and contractors from Boeing Military Aircraft Company, Computational Logic Inc., Odyssey Research Associates, SRI International, University of California at Davis, and Vigyan Inc.
NASA Technical Reports Server (NTRS)
Adams, Neil S.; Bollenbacher, Gary
1992-01-01
This report discusses the development and underlying mathematics of a rigid-body computer model of a proposed cryogenic on-orbit liquid depot storage, acquisition, and transfer spacecraft (COLD-SAT). This model, referred to in this report as the COLD-SAT dynamic model, consists of both a trajectory model and an attitudinal model. All disturbance forces and torques expected to be significant for the actual COLD-SAT spacecraft are modeled to the required degree of accuracy. Control and experimental thrusters are modeled, as well as fluid slosh. The model also computes microgravity disturbance accelerations at any specified point in the spacecraft. The model was developed by using the Boeing EASY5 dynamic analysis package and will run on Apollo, Cray, and other computing platforms.
2016-07-29
The solar arrays for Boeing's CST-100 Starliner spacecraft are seen at Spectrolab in Sylmar, California. The solar arrays will power the Starliner as it flies through space and while it is docked to the International Space Station. Photo credit: Boeing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, G.P.; Oens, M.A.; Spanner, G.E.
1994-01-01
This impact evaluation of two lighting retrofit projects that were recently installed at Boeing Commercial Airplane Group (Boeing) was conducted for the Bonneville Power Administration (Bonneville) as part of an evaluation of its Energy $avings Plan (E$P) Program. The first project was a light-fixture and lighting control retrofit, consisting of five individual measures installed in Building 40-05. The second project was a retrofit of all parking lot lighting on the site. The objective of this impact evaluation was to assess how much electrical energy is being saved at Boeing as a result of the E$P projects and to determine howmore » much the savings cost Bonneville and the region. The impact of the project was evaluated with a combination of engineering analysis, financial analysis, interviews, and submittal reviews (Boeing`s proposals and completion reports).« less
NASA Astrophysics Data System (ADS)
Ness, P. H.; Jacobson, H.
1984-10-01
The thrust of 'group technology' is toward the exploitation of similarities in component design and manufacturing process plans to achieve assembly line flow cost efficiencies for small batch production. The systematic method devised for the identification of similarities in component geometry and processing steps is a coding and classification scheme implemented by interactive CAD/CAM systems. This coding and classification scheme has led to significant increases in computer processing power, allowing rapid searches and retrievals on the basis of a 30-digit code together with user-friendly computer graphics.
2016-07-12
The center solar array for Boeing's CST-100 Starliner spacecraft is seen at Spectrolab in Sylmar, California. The solar arrays will power the Starliner as it flies through space and while it is docked to the International Space Station. Photo credit: Boeing
2016-10-17
Engineers work with the solar array for Boeing's CST-100 Starliner spacecraft at Spectrolab in Sylmar, California. The solar arrays will power the Starliner as it flies through space and while it is docked to the International Space Station. Photo credit: Boeing
RF Breakdown Prevention, Part 2 Product Overview
2015-05-07
Farrell The Boeing Company Bruce Flanick Northrop Grumman Aimee Hubble The Aerospace Corporation Thomas Musselman The Boeing Company Preston Partridge...Name Organization Preston Partridge The Aerospace Corporation James Farrell Boeing Jeff Tate Raytheon Aimee Hubble The Aerospace Corporation Rostislav
Engineering--A Career for 330 Women at Boeing
ERIC Educational Resources Information Center
Minor, Barbara
1974-01-01
Describes the efforts of the Boeing Company to encourage and hire women for engineering jobs. Much of the article is devoted to women employed by Boeing in engineering jobs and their comments about engineering as a career for women. (BR)
NCV Flow Diagnostic Test Results
NASA Technical Reports Server (NTRS)
Cappuccio, Mina
1999-01-01
There were two objectives for this test. First, was to assess the reasons why there is approximately 1.5 drag counts (cts) discrepancy between measured and computed drag improvement of the Non-linear Cruise Validation (NCV) over the Technology Concept Airplane (TCA) wing body (WB) configurations. The Navier-Stokes (N-S) pre-test predictions from Boeing Commercial Airplane Group (BCAG) show 4.5 drag cts of improvement for NCV over TCA at a lift coefficient (CL) of 0. I at Mach 2.4. The pre-test predictions from Boeing Phantom Works - Long Beach, BPW-LB, show 3.75 drag cts of improvement. BCAG used OVERFLOW and BPW-LB used CFL3D. The first test entry to validate the improvement was held at the NASA Langley Research Center (LARC) UPV;T, test number 1687. The experimental results showed that the drag improvement was only 2.6 cts, not accounting for laminar run and trip drag. This is approximately 1.5 cts less than predicted computationally. In addition to the low Reynolds Number (RN) test, there was a high RN test in the Boeing Supersonic Wind Tunnel (BSWT) of NCV and TCA. BSV@T test 647 showed that the drag improvement of NCV over TCA was also 2.6 cts, but this did account for laminar run and trip drag. Every effort needed to be done to assess if the improvement measured in LaRC UPWT and BSWT was correct. The second objective, once the first objective was met, was to assess the performance increment of NCV over TCA accounting for the associated laminar run and trip drag corrections in LaRC UPWT. We know that the configurations tested have laminar flow on portions of the wing and have trip drag due to the mechanisms used to force the flow to go from laminar to turbulent aft of the transition location.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. On Pad 17-A, Cape Canaveral Air Force Station, technicians on the ground hold guide ropes as a Solid Rocket Booster is lifted in to the mobile service tower. In all, three SRBs will be attached to the Boeing Delta launch vehicle for the Swift spacecraft and its Gamma-Ray Burst Mission. Swift is a medium-class Explorer mission managed by NASAs Goddard Space Flight Center in Greenbelt, Md.
77 FR 71723 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-04
... Airworthiness Directives; The Boeing Company Airplanes AGENCY: Federal Aviation Administration (FAA), DOT... directive (AD) that applies to certain The Boeing Company Model 737-200, -200C, - 300, and -400 series... related investigative and corrective actions, and revise certain inspection types. This proposed AD would...
The BOEING 777 - concurrent engineering and digital pre-assembly
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abarbanel, B.
The processes created on the 777 for checking designs were called {open_quotes}digital pre-assembly{close_quotes}. Using FlyThru(tm), a spin-off of a Boeing advanced computing research project, engineers were able to view up to 1500 models (15000 solids) in 3d traversing that data at high speed. FlyThru(tm) was rapidly deployed in 1991 to meet the needs of the 777 for large scale product visualization and verification. The digital pre-assembly process has bad fantastic results. The 777 has had far fewer assembly and systems problems compared to previous airplane programs. Today, FlyThru(tm) is installed on hundreds of workstations on almost every airplane program, andmore » is being used on Space Station, F22, AWACS, and other defense projects. It`s applications have gone far beyond just design review. In many ways, FlyThru is a Data Warehouse supported by advanced tools for analysis. It is today being integrated with Knowledge Based Engineering geometry generation tools.« less
NASA Technical Reports Server (NTRS)
Oleson, M.; Slavin, T.; Liening, F.; Olson, R. L.
1986-01-01
Parametric data for six waste management subsystems considered for use on the Space Station are compared, i.e.: (1) dry incineration; (2) wet oxidation; (3) supercritical water oxidation; (4) vapor compression distillation; (5) thermoelectric integrated membrane evaporation system; and (6) vapor phase catalytic ammonia removal. The parameters selected for comparison are on-orbit weight and volume, resupply and return to Earth logistics, power consumption, and heat rejection. Trades studies are performed on subsystem parameters derived from the most recent literature. The Boeing Engineering Trade Study (BETS), an environmental control and life support system (ECLSS) trade study computer program developed by Boeing Aerospace Company, is used to properly size the subsystems under study. The six waste treatment subsystems modeled in this program are sized to process the wastes for a 90-day Space Station mission with an 8-person crew, and an emergency supply period of 28 days. The resulting subsystem parameters are compared not only on an individual subsystem level but also as part of an integrated ECLSS.
Modular Engine Noise Component Prediction System (MCP) Program Users' Guide
NASA Technical Reports Server (NTRS)
Golub, Robert A. (Technical Monitor); Herkes, William H.; Reed, David H.
2004-01-01
This is a user's manual for Modular Engine Noise Component Prediction System (MCP). This computer code allows the user to predict turbofan engine noise estimates. The program is based on an empirical procedure that has evolved over many years at The Boeing Company. The data used to develop the procedure include both full-scale engine data and small-scale model data, and include testing done by Boeing, by the engine manufacturers, and by NASA. In order to generate a noise estimate, the user specifies the appropriate engine properties (including both geometry and performance parameters), the microphone locations, the atmospheric conditions, and certain data processing options. The version of the program described here allows the user to predict three components: inlet-radiated fan noise, aft-radiated fan noise, and jet noise. MCP predicts one-third octave band noise levels over the frequency range of 50 to 10,000 Hertz. It also calculates overall sound pressure levels and certain subjective noise metrics (e.g., perceived noise levels).
Hybrid Wing-Body Pressurized Fuselage and Bulkhead, Design and Optimization
NASA Technical Reports Server (NTRS)
Mukhopadhyay, Vivek
2013-01-01
The structural weight reduction of a pressurized Hybrid Wing-Body (HWB) fuselage is a serious challenge. Hence, research and development are presently being continued at NASA under the Environmentally Responsible Aviation (ERA) and Subsonic Fixed Wing (SFW) projects in collaboration with the Boeing Company, Huntington Beach and Air Force Research Laboratory (AFRL). In this paper, a structural analysis of the HWB fuselage and bulkhead panels is presented, with the objectives of design improvement and structural weight reduction. First, orthotropic plate theories for sizing, and equivalent plate analysis with appropriate simplification are considered. Then parametric finite-element analysis of a fuselage section and bulkhead are conducted using advanced stitched composite structural concepts, which are presently being developed at Boeing for pressurized HWB flight vehicles. With this advanced stiffened-shell design, structural weights are computed and compared to the thick sandwich, vaulted-ribbed-shell, and multi-bubble stiffened-shell structural concepts that had been studied previously. The analytical and numerical results are discussed to assess the overall weight/strength advantages.
78 FR 47549 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-06
... Airworthiness Directives; The Boeing Company Airplanes AGENCY: Federal Aviation Administration (FAA), DOT... to certain The Boeing Company Model 737-200, -200C, -300, and -400 series airplanes. AD 2000-06-13 R1..., adds inspections and related investigative and corrective actions, revises certain inspection types...
Requirements for a geometry programming language for CFD applications
NASA Technical Reports Server (NTRS)
Gentry, Arvel E.
1992-01-01
A number of typical problems faced by the aerodynamicist in using computational fluid dynamics are presented to illustrate the need for a geometry programming language. The overall requirements for such a language are illustrated by examples from the Boeing Aero Grid and Paneling System (AGPS). Some of the problems in building such a system are also reviewed along with suggestions as to what to look for when evaluating new software problems.
STS-126 crew during preflight VR LAB MSS EVA2 training
2008-04-14
JSC2008-E-033771 (14 April 2008) --- Astronaut Eric A. Boe, STS-126 pilot, uses the virtual reality lab in the Space Vehicle Mockup Facility at NASA's Johnson Space Center to train for some of his duties aboard the space shuttle and space station. This type of computer interface, paired with virtual reality training hardware and software, helps to prepare the entire team for dealing with space station elements.
78 FR 47233 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-05
...-0670; Directorate Identifier 2013-NM-081-AD] RIN 2120-AA64 Airworthiness Directives; The Boeing Company...). SUMMARY: We propose to adopt a new airworthiness directive (AD) for certain The Boeing Company Model 737-600, -700, -800, -900, and -900ER airplanes modified by particular supplemental type certificates (STC...
77 FR 6692 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-09
...-0110; Directorate Identifier 2011-NM-148-AD] RIN 2120-AA64 Airworthiness Directives; The Boeing Company...). SUMMARY: We propose to adopt a new airworthiness directive (AD) for certain The Boeing Company Model 737... devices (ATSDs) installed in accordance with Supplemental Type Certificate number ST00146BO. This proposed...
78 FR 21276 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-10
...-0301; Directorate Identifier 2013-NM-025-AD] RIN 2120-AA64 Airworthiness Directives; The Boeing Company...). SUMMARY: We propose to adopt a new airworthiness directive (AD) for certain The Boeing Company Model 767... necessary, a detailed inspection to determine the nut type installed in the outboard flap support rib and...
STS-133 crew members Lindsey, Boe and Drew during Tool/Repair Kits training with instructor
2010-01-26
JSC2010-E-014264 (26 Jan. 2010) --- NASA astronaut Eric Boe, STS-133 pilot, participates in an ISS tools and repair kits training session in the Space Vehicle Mock-up Facility at NASA's Johnson Space Center. Instructor Ivy Apostolakopoulos assisted Boe.
Boeing CST-100 Starliner Parachute Test
2017-02-22
A boilerplate CST-100 Starliner is lifted skyward by a balloon for a drop test of the Starliner's parachute system. Boeing, which is building the Starliner, conducted the test in White Sands, New Mexico, as part of the testing campaign for certification by NASA's Commercial Crew Program. Photo credit: Boeing
78 FR 66986 - Petition for Exemption; Summary of Petition Received
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-07
... have a means to view outside conditions under all lighting situations for certain Boeing Model 747-8.... The amendment would extend the relief to all Boeing 747-8 airplanes manufactured before production... Director, Office of Rulemaking. Petition for Exemption Docket No.: FAA-2011-0883. Petitioner: The Boeing...
Degradation mechanisms of Ti/Al/Ni/Au-based Ohmic contacts on AlGaN/GaN HEMTs
Hwang, Ya-Hsi; Ahn, Shihyun; Dong, Chen; ...
2015-04-27
We investigated the degradation mechanism of Ti/Al/Ni/Au-based Ohmic metallization on AlGaN/GaN high electron mobility transistors upon exposure to buffer oxide etchant (BOE). The major effect of BOE on the Ohmic metal was an increase of sheet resistance from 2.89 to 3.69 Ω/ₜafter 3 min BOE treatment. The alloyed Ohmic metallization consisted 3–5 μm Ni-Al alloy islands surrounded by Au-Al alloy-rings. The morphology of both the islands and ring areas became flatter after BOE etching. Lastly, we used energy dispersive x-ray analysis and Auger electron microscopy to analyze the compositions and metal distributions in the metal alloys prior to and aftermore » BOE exposure.« less
Boeing Extrication Team training on Boeing Mock-Up Trainer (BMT)
2018-05-25
The Boeing extrication team train on the Boeing Mock-up Trainer from May 25 through May 28, 2018, at NASA's Johnson Space Center in Houston. The extrication team is comprised of firefighters from various U.S. Boeing sites. Each member of the team brings an expertise in Aerospace Confined Space Rescue, are Emergency Medical Technicians and have years of rescue experience. The team is highly motivated to getting the crew out quickly, safely and efficiently. The training at Johnson included suit training, side hatch egress, and Intravehicular Activity (IVA) rigging and egress. The week included a run for record on IVA egress for a testing requirement. Participants also included NASA Medical, the 45th Operations Group's Detachment 3, based at Patrick Air Force Base, and U.S. Air Force pararescue representation.
Full-scale flammability test data for validation of aircraft fire mathematical models
NASA Technical Reports Server (NTRS)
Kuminecz, J. F.; Bricker, R. W.
1982-01-01
Twenty-five large scale aircraft flammability tests were conducted in a Boeing 737 fuselage at the NASA Johnson Space Center (JSC). The objective of this test program was to provide a data base on the propagation of large scale aircraft fires to support the validation of aircraft fire mathematical models. Variables in the test program included cabin volume, amount of fuel, fuel pan area, fire location, airflow rate, and cabin materials. A number of tests were conducted with jet A-1 fuel only, while others were conducted with various Boeing 747 type cabin materials. These included urethane foam seats, passenger service units, stowage bins, and wall and ceiling panels. Two tests were also included using special urethane foam and polyimide foam seats. Tests were conducted with each cabin material individually, with various combinations of these materials, and finally, with all materials in the cabin. The data include information obtained from approximately 160 locations inside the fuselage.
2000-06-22
Aerospace industry representatives view actual and mock-up versions of 'X-Planes' intended to enhance access to space during a technical exposition on June 22, 2000 at Dryden Flight Research Center, Edwards, California. From left to right: NASA's B-52 launch aircraft, in service with NASA from 1959 to 2004; a neutral-buoyancy model of the Boeing's X-37; the Boeing X-40A behind the MicroCraft X-43 mock-up; Orbital Science's X-34 and the modified Lockheed L-1011 airliner that was intended to launch the X-34. These X-vehicles are part of NASA's Access to Space plan intended to bring new technologies to bear in an effort to dramatically lower the cost of putting payloads in space, and near-space environments. The June 22, 2000 NASA Reusable Launch Vehicle (RLV) Technology Exposition included presentations on the history, present, and future of NASA's RLV program. Special Sessions for industry representatives highlighted the X-37 project and its related technologies. The X-37 project is managed by NASA's Marshall Space Flight Center, Huntsville, Alabama.
2000-06-22
Aerospace industry representatives view actual and mock-up versions of 'X-Planes' intended to enhance access to space during a technical exposition on June 22, 2000 at Dryden Flight Research Center, Edwards, California. From left to right: NASA's B-52 launch aircraft, in service with NASA since 1959; a neutral-buoyancy model of the Boeing's X-37; the Boeing X-40A behind the MicroCraft X-43 mock-up; Orbital Science's X-34 and the modified Lockheed L-1011 airliner that was intended to launch the X-34. These X-vehicles are part of NASA's Access to Space plan intended to bring new technologies to bear in an effort to dramatically lower the cost of putting payloads in space, and near-space environments. The June 22, 2000 NASA Reusable Launch Vehicle (RLV) Technology Exposition included presentations on the history, present, and future of NASA's RLV program. Special Sessions for industry representatives highlighted the X-37 project and its related technologies. The X-37 project is managed by NASA's Marshall Space Flight Center, Huntsville, Alabama.
2000-06-22
Aerospace industry representatives view actual and mock-up versions of 'X-Planes' intended to enhance access to space during a technical exposition on June 22, 2000 at Dryden Flight Research Center, Edwards, California. From left to right: NASA's B-52 launch aircraft, in service with NASA from 1959 to 2004; a neutral-buoyancy model of the Boeing's X-37; the Boeing X-40A behind the MicroCraft X-43 mock-up; Orbital Science's X-34 and the modified Lockheed L-1011 airliner that was intended to launch the X-34. These X-vehicles are part of NASA's Access to Space plan intended to bring new technologies to bear in an effort to dramatically lower the cost of putting payloads in space, and near-space environments. The June 22, 2000 NASA Reusable Launch Vehicle (RLV) Technology Exposition included presentations on the history, present, and future of NASA's RLV program. Special Sessions for industry representatives highlighted the X-37 project and its related technologies. The X-37 project is managed by NASA's Marshall Space Flight Center, Huntsville, Alabama.
2000-06-22
Aerospace industry representatives view actual and mock-up versions of 'X-Planes' intended to enhance access to space during a technical exposition on June 22, 2000 at Dryden Flight Research Center, Edwards, California. From left to right: NASA's B-52 launch aircraft, in service with NASA since 1959; a neutral-buoyancy model of the Boeing's X-37; the Boeing X-40A behind the MicroCraft X-43 mock-up; Orbital Science's X-34 and the modified Lockheed L-1011 airliner that was intended to launch the X-34. These X-vehicles are part of NASA's Access to Space plan intended to bring new technologies to bear in an effort to dramatically lower the cost of putting payloads in space, and near-space environments. The June 22, 2000 NASA Reusable Launch Vehicle (RLV) Technology Exposition included presentations on the history, present, and future of NASA's RLV program. Special Sessions for industry representatives highlighted the X-37 project and its related technologies. The X-37 project is managed by NASA's Marshall Space Flight Center, Huntsville, Alabama.
STS-92 - Towing of Shuttle Discovery and Boeing 747 Shuttle Carrier Aircraft (SCA)
NASA Technical Reports Server (NTRS)
2000-01-01
The Space Shuttle Discovery sits atop one of NASA's modified Boeing 747 Shuttle Carrier Aircraft as the unusual piggyback duo is towed along a taxiway at NASA's Dryden Flight Research Center at Edwards, California. The Discovery was ferried from NASA Dryden to NASA's Kennedy Space Center in Florida on November 2, 2000, after extensive pre-ferry servicing and preparations. STS-92 was the 100th mission since the fleet of four Space Shuttles began flying in 1981. (Due to schedule changes, missions are not always launched in the order that was originally planned.) The almost 13-day mission, the 46th Shuttle mission to land at Edwards, was the last construction mission for the International Space Station prior to the first scientists taking up residency in the orbiting space laboratory the following month. The seven-member crew on STS-92 included mission specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao, pilot Pam Melroy and mission commander Brian Duffy.
Software Technology for Adaptable, Reliable Systems (STARS) Technical Program Plan,
1986-08-06
Shadow projects that are being considered by the SEI: Service Project Company . . Army FATDS Magnavox CSS To Be Determined PLRS Hughes Navy BSY-I IBM...ISCS Rockwell ACDS Hughes Air Force Simulators Boeing CSSR GTE ATF Grumman MILSTAR Lockheed Figure 4-2 Candidate FY 1986 Shadow Projects 4.2.3 SHADOW...Journal of the Armed Forces Communications and Electronic Association, September 1985. 11. Schill, J., Smeaton, R., and Jackman , R., The Conversion of
2014-04-23
It has been called the world's greatest piggyback ride: a space shuttle, atop a Boeing 747 jet aircraft. But this is no ordinary 747, this is the Shuttle Carrier Aircraft...the SCA. This specially modified jumbo jet was not only a taxi service for the shuttle, but also helped in the development of the shuttle itself. In 30 years of flying, the majestic image of a spacecraft joined to the SCA, became a symbol of American invention and ingenuity.
War in the Information Age: A Primer for Cyberspace Operations in 21st Century Warfare
2010-01-01
funds transfers ( EFT ). 30 Paralleling the rapid expansion of civilian cyberspace use is the increasing use of cyberspace by modern militaries...company files by using a thumb drive to tap the corporate system. Boeing estimated that the stolen documents would have cost it between $5 billion...tactics and intelligence operations such as collecting data, recruiting members of state security services, and setting up phone taps .‖ 69
76 FR 62603 - Special Conditions: The Boeing Company, Model 747-8; Upper Deck Occupancy
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-11
... Conditions No. 25-446-SC] Special Conditions: The Boeing Company, Model 747-8; Upper Deck Occupancy AGENCY.... SUMMARY: These special conditions are issued for the Boeing Model 747-8 airplane. These airplanes will... airworthiness regulations do not contain adequate or appropriate safety standards for this design feature. These...
2008-11-26
S126-E-011534 (26 Nov. 2008) --- Astronaut Eric Boe, STS-126 pilot, floats near the hatchway of the multi-purpose logistics module Leonardo, temporarily docked with the International Space Station to aid in the transfer of supplies and hardware. Leonardo, like Boe and the rest of the Endeavour crew, will return to Earth over the coming weekend.
Boeing CST-100 Starliner Parachute Test
2017-02-22
The parachute deployment is seen from the top hatch of a boilerplate CST-100 Starliner during a drop test of the Starliner's parachute system. Boeing, which is building the Starliner, conducted the test in White Sands, New Mexico, as part of the testing campaign for certification by NASA's Commercial Crew Program. Photo credit: Boeing
Conceptual Design and Structural Analysis of an Open Rotor Hybrid Wing Body Aircraft
NASA Technical Reports Server (NTRS)
Gern, Frank H.
2013-01-01
Through a recent NASA contract, Boeing Research and Technology in Huntington Beach, CA developed and optimized a conceptual design of an open rotor hybrid wing body aircraft (HWB). Open rotor engines offer a significant potential for fuel burn savings over turbofan engines, while the HWB configuration potentially allows to offset noise penalties through possible engine shielding. Researchers at NASA Langley converted the Boeing design to a FLOPS model which will be used to develop take-off and landing trajectories for community noise analyses. The FLOPS model was calibrated using Boeing data and shows good agreement with the original Boeing design. To complement Boeing s detailed aerodynamics and propulsion airframe integration work, a newly developed and validated conceptual structural analysis and optimization tool was used for a conceptual loads analysis and structural weights estimate. Structural optimization and weight calculation are based on a Nastran finite element model of the primary HWB structure, featuring centerbody, mid section, outboard wing, and aft body. Results for flight loads, deformations, wing weight, and centerbody weight are presented and compared to Boeing and FLOPS analyses.
Orbital Express Mission Operations Planning and Resource Management using ASPEN
NASA Technical Reports Server (NTRS)
Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Danny
2008-01-01
The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team
CCP Astronaut Eric Boe, GOES-S Prepared for Launch
2018-02-28
NASA astronaut Eric Boe, one of four astronauts working with the agency’s Commercial Crew Program, had the opportunity to check out the Crew Access Tower at Space Launch Complex 41 (SLC-41) Wednesday with a United Launch Alliance Atlas V on the pad. Boe, along with launch operations engineers from NASA, Boeing, and ULA, climbed the launch pad tower to evaluate lighting and spotlights after dark. The survey helped ensure crew members will have acceptable visibility as they prepare to launch aboard Boeing’s Starliner spacecraft on the Crew Flight Test to the International Space Station targeted for later this year.
Advanced Configurations for Very Large Subsonic Transport Airplanes
NASA Technical Reports Server (NTRS)
McMasters, John H.; Paisley, David J.; Hubert, Richard J.; Kroo, Ilan; Bofah, Kwasi K.; Sullivan, John P.; Drela, Mark
1996-01-01
Recent aerospace industry interest in developing a subsonic commercial transport airplane with 50 percent greater passenger capacity than the largest existing aircraft in this category (the Boeing 747-400 with approximately 400-450 seats) has generated a range of proposals based largely on the configuration paradigm established nearly 50 years ago with the Boeing B-47 bomber. While this basic configuration paradigm has come to dominate subsonic commercial airplane development since the advent of the Boeing 707/Douglas DC-8 in the mid-1950's, its extrapolation to the size required to carry more than 600-700 passengers raises several questions. To explore these and a number of related issues, a team of Boeing, university, and NASA engineers was formed under the auspices of the NASA Advanced Concepts Program. The results of a Research Analysis focused on a large, unconventional transport airplane configuration for which Boeing has applied for a patent are the subject of this report. It should be noted here that this study has been conducted independently of the Boeing New Large Airplane (NLA) program, and with the exception of some generic analysis tools which may be common to this effort and the NLA (as will be described later), no explicit Boeing NLA data other than that published in the open literature has been used in the conduct of the study reported here.
2006-07-13
KENNEDY SPACE CENTER, FLA. - At Launch Pad 17-B on Cape Canaveral Air Force Station, the Boeing Delta II second stage for the STEREO launch is moved inside the mobile service tower. The second stage then will be lifted into the mobile service tower and mated with first stage already in place. STEREO stands for Solar Terrestrial Relations Observatory and comprises two spacecraft. The STEREO mission is the first to take measurements of the sun and solar wind in 3-dimension. This new view will improve our understanding of space weather and its impact on the Earth. STEREO is expected to lift off in August 2006. Photo credit: NASA/George Shelton
NASA Technical Reports Server (NTRS)
Kafka, P. G.; Skibo, M. A.; White, J. L.
1977-01-01
The feasibility of measuring JT9D propulsion system flight inertia loads on a 747 airplane is studied. Flight loads background is discussed including the current status of 747/JT9D loads knowledge. An instrumentation and test plan is formulated for an airline-owned in-service airplane and the Boeing-owned RA001 test airplane. Technical and cost comparisons are made between these two options. An overall technical feasibility evaluation is made and a cost summary presented. Conclusions and recommendations are presented in regard to using existing inertia loads data versus conducting a flight test to measure inertia loads.
NASA Technical Reports Server (NTRS)
Lax, F. M.
1975-01-01
A time-controlled navigation system applicable to the descent phase of flight for airline transport aircraft was developed and simulated. The design incorporates the linear discrete-time sampled-data version of the linearized continuous-time system describing the aircraft's aerodynamics. Using optimal linear quadratic control techniques, an optimal deterministic control regulator which is implementable on an airborne computer is designed. The navigation controller assists the pilot in complying with assigned times of arrival along a four-dimensional flight path in the presence of wind disturbances. The strategic air traffic control concept is also described, followed by the design of a strategic control descent path. A strategy for determining possible times of arrival at specified waypoints along the descent path and for generating the corresponding route-time profiles that are within the performance capabilities of the aircraft is presented. Using a mathematical model of the Boeing 707-320B aircraft along with a Boeing 707 cockpit simulator interfaced with an Adage AGT-30 digital computer, a real-time simulation of the complete aircraft aerodynamics was achieved. The strategic four-dimensional navigation controller for longitudinal dynamics was tested on the nonlinear aircraft model in the presence of 15, 30, and 45 knot head-winds. The results indicate that the controller preserved the desired accuracy and precision of a time-controlled aircraft navigation system.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-25
...; Special Conditions No. 25-442-SC] Special Conditions: Boeing Model 747-8 Series Airplanes; Overhead Flight... conditions. SUMMARY: These special conditions are issued for Boeing Model 747-8 series airplanes. These... applied for, and was granted, an extension of time for the amended type certificate, which changed the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-09
... Ltd., Hynix Semiconductor (Wuxi) Ltd., and Boeing Tianjin Composites Co. Ltd. in the People's Republic... and transferred (in- country) to the approved facility of VEU Boeing Tianjin Composites Co. Ltd. (BTC... ECCN)'' for Boeing Tianjin Composites Co. Ltd. BIS designated BHA Aero Composite Parts Co. as a VEU on...
ERIC Educational Resources Information Center
RESCUE, Litchfield, CT.
The Connecticut Business and Office Education (BOE) curriculum was revised in light of critical issues in BOE. The issues were studied prior to revision, and the following recommendations were made: (1) requiring a minimum of one semester of electronic keyboarding and word processing; (2) placing equal emphasis on management, logical thinking…
Criteria evaluation for cleanliness testing phase 0
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meltzer, Michael; Koester, Carolyn; Stefanni, Chris
1999-02-04
The Boeing Company (Boeing) contracted with Lawrence Livermore National Laboratory (LLNL) to develop criteria for evaluating the efficacy of its parts cleaning processes. In particular, LLNL and Boeing are attempting to identify levels of contamination that lead to parts failures. Sufficient contamination to cause impairment of anodizing, alodining, painting, or welding operations is considered a "part failure." In the "Phase 0" part of the project that was recently completed, preliminary analyses of aluminum substrates were performed as a first step in determining suitable cleanliness criteria for actual Boeing parts made from this material. A wide spread of contamination levels wasmore » specified for the Phase 0 test coupons, in the hopes of finding a range in which an appropriate cleanliness specification might lie. It was planned that, based on the results of the Phase 0 testing, further more detailed analyses ("Phase 1 testing") would be performed in order to more accurately identify the most appropriate criteria. For the Phase 0 testing, Boeing supplied LLNL with 3" x 6" and 3" x 10" aluminum test panels which LLNL contaminated with measured amounts of typical hydrocarbon substances encountered in Boeing' s fabrication operations. The panels were then subjected by Boeing to normal cleaning procedures, after which they went through one of the following sets of operations: l anodizing and primer painting . alodining (chromating) and primer painting l welding The coatings or welds were then examined by both Boeing and LLNL to determine whether any of the operations were impaired, and whether there was a correlation between contamination level and damage to the parts. The experimental approach and results are described in detail.« less
NASA Technical Reports Server (NTRS)
Wilber, George F.
2017-01-01
This Software Description Document (SDD) captures the design for developing the Flight Interval Management (FIM) system Configurable Graphics Display (CGD) software. Specifically this SDD describes aspects of the Boeing CGD software and the surrounding context and interfaces. It does not describe the Honeywell components of the CGD system. The SDD provides the system overview, architectural design, and detailed design with all the necessary information to implement the Boeing components of the CGD software and integrate them into the CGD subsystem within the larger FIM system. Overall system and CGD system-level requirements are derived from the CGD SRS (in turn derived from the Boeing System Requirements Design Document (SRDD)). Display and look-and-feel requirements are derived from Human Machine Interface (HMI) design documents and working group recommendations. This Boeing CGD SDD is required to support the upcoming Critical Design Review (CDR).
Operational flight evaluation of the two-segment approach for use in airline service
NASA Technical Reports Server (NTRS)
Schwind, G. K.; Morrison, J. A.; Nylen, W. E.; Anderson, E. B.
1975-01-01
United Airlines has developed and evaluated a two-segment noise abatement approach procedure for use on Boeing 727 aircraft in air carrier service. In a flight simulator, the two-segment approach was studied in detail and a profile and procedures were developed. Equipment adaptable to contemporary avionics and navigation systems was designed and manufactured by Collins Radio Company and was installed and evaluated in B-727-200 aircraft. The equipment, profile, and procedures were evaluated out of revenue service by pilots representing government agencies, airlines, airframe manufacturers, and professional pilot associations. A system was then placed into scheduled airline service for six months during which 555 two-segment approaches were flown at three airports by 55 airline pilots. The system was determined to be safe, easy to fly, and compatible with the airline operational environment.
Human-Centered Design of Human-Computer-Human Dialogs in Aerospace Systems
NASA Technical Reports Server (NTRS)
Mitchell, Christine M.
1998-01-01
A series of ongoing research programs at Georgia Tech established a need for a simulation support tool for aircraft computer-based aids. This led to the design and development of the Georgia Tech Electronic Flight Instrument Research Tool (GT-EFIRT). GT-EFIRT is a part-task flight simulator specifically designed to study aircraft display design and single pilot interaction. ne simulator, using commercially available graphics and Unix workstations, replicates to a high level of fidelity the Electronic Flight Instrument Systems (EFIS), Flight Management Computer (FMC) and Auto Flight Director System (AFDS) of the Boeing 757/767 aircraft. The simulator can be configured to present information using conventional looking B757n67 displays or next generation Primary Flight Displays (PFD) such as found on the Beech Starship and MD-11.
Boeing CST-100 Starliner/ULA Atlas V Wind Tunnel Demonstration
2016-10-13
An engineer works with a model of a United Launch Alliance Atlas V rocket with a Boeing CST-100 Starliner capsule inside a wind tunnel at NASA's Ames Research Center in California. The Starliner/Atlas V system is under development by Boeing and ULA in partnership with NASA's Commercial Crew Program to launch astronauts to the International Space Station.
De-Icing of Aircraft Turbine Engine Inlets
1988-06-01
W0OO Aviona Marcel Dassault TFE731 -3 tirbolan Falcon 50 Avlons Maircel Dsasaau ATF34A Turbolan Falcon 200 Avian* Marcel Dassault ATF3.6 1b.bolan HU25A...Aviana Maemel Dassault TFE731 -4A Turbolan Falcon 900 Avion@ Marcel Dassault J73D 1Ubots 797 Boeing .1110 )Irbotkn 727 Boeing .1750 TUrbolan 737 Boeing
Boeing CST-100 Starliner Processing
2018-04-26
Boeing’s CST-100 Pad Abort Test Vehicle is almost ready to head to White Sands, New Mexico, to test the launch abort engines. During that test, the four abort engines will prove that the vehicle can safely perform an abort maneuver in the event of an emergency on the launchpad or during flight. The vehicle is mated to the service module for a fit check, and then the two will be taken apart for final preparations before heading to the desert.
The NASA B-757 HIRF Test Series: Flight Test Results
NASA Technical Reports Server (NTRS)
Moeller, Karl J.; Dudley, Kenneth L.
1997-01-01
In 1995, the NASA Langley Research Center conducted a series of aircraft tests aimed at characterizing the electromagnetic environment (EME) in and around a Boeing 757 airliner. Measurements were made of the electromagnetic energy coupled into the aircraft and the signals induced on select structures as the aircraft was flown past known RF transmitters. These measurements were conducted to provide data for the validation of computational techniques for the assessment of electromagnetic effects in commercial transport aircraft. This paper reports on the results of flight tests using RF radiators in the HF, VHF, and UHF ranges and on efforts to use computational and analytical techniques to predict RF field levels inside the airliner at these frequencies.
Ada and software management in NASA: Symposium/forum
NASA Technical Reports Server (NTRS)
1989-01-01
The promises of Ada to improve software productivity and quality, and the claims that a transition to Ada would require significant changes in NASA's training programs and ways of doing business were investigated. The study assesses the agency's ongoing and planned Ada activities. A series of industry representatives (Computer Sciences Corporation, General Electric Aerospace, McDonnell Douglas Space Systems Company, TRW, Lockheed, and Boeing) reviewed the recommendations and assessed their impact from the Company's perspective. The potential effects on NASA programs were then discussed.
NASA Technical Reports Server (NTRS)
Gabel, R.; Lang, P.; Reed, D.
1993-01-01
Mathematical models based on the finite element method of structural analysis, as embodied in the NASTRAN computer code, are routinely used by the helicopter industry to calculate airframe static internal loads used for sizing structural members. Historically, less reliance has been placed on the vibration predictions based on these models. Beginning in the early 1980's NASA's Langley Research Center initiated an industry wide program with the objective of engendering the needed trust in vibration predictions using these models and establishing a body of modeling guides which would enable confident future prediction of airframe vibration as part of the regular design process. Emphasis in this paper is placed on the successful modeling of the Army/Boeing CH-47D which showed reasonable correlation with test data. A principal finding indicates that improved dynamic analysis requires greater attention to detail and perhaps a finer mesh, especially the mass distribution, than the usual stress model. Post program modeling efforts show improved correlation placing key modal frequencies in the b/rev range with 4 percent of the test frequencies.
NACA/NASA test pilot Stanley P. Butchart
NASA Technical Reports Server (NTRS)
1954-01-01
Stanley P. Butchart joined the National Advisory Committee for Aeronautics' High-Speed Flight Research Station on May 10, 1951. Stan was the fourth research pilot hired at the Station affording him the opportunity to fly the early research aircraft. Stan began a flying career while attending Junior College. He received primary and secondary civilian pilot training, enlisting in the U.S. Navy in July 1942. Stan took his Navy air training at Corpus Christi, Texas. Upon completion of training he was assigned to a torpedo-bomber Air Group, VT-51, flying Grumman-General Motors TBM Avenger, a torpedo-bomber, from the carrier San Jacinto in the South Pacific. When World War II ended, Stan was released from active duty as a Navy Lieutenant, with a Distinguished Flying Cross and a Presidential Unit Citation among his service medals. Butchart elected to stay in the Naval Reserve group and flew for an additional 5 years while he attended the University of Washington. By 1950, Stan had earned bachelor degrees in aeronautical engineering and mechanical engineering. After graduation he went to work for Boeing Aircraft as a junior design engineer and was assigned to the B-47 body group. In May 1951, he arrived at the NACA facility to start a career as a research pilot. Stan flew the Douglas D-558-I #3 (12 flights, first on October 19, 1951), the Douglas D-558-II #3 (2 pilot check-out flights, first on June 26, 1953), Northrop X-4 (4 flights, first on May 27, 1952), Bell X-5 (13 flights, first in early December 1952). Other aircraft flown on research projects were the Boeing KC-135 Stratotanker, Convair CV-990, Boeing B-52-003, Boeing B-747, North American F-100A, Convair F-102, Piper PA-30 Twin Comanche, General Dynamics F-111, Boeing B-720, Convair CV-880, and the Boeing B-47 Stratojet, his favorite. he also flew many other aircraft. Stan did nearly all of the big airplane work at the Center. The biggest work load was flying the Boeing B-29 Stratofortress (Navy designation: P2B). At this time the pilot of the aircraft was the one in charge. It was the pilot who called for the chase planes before drop time, then for the fire trucks to be in position, and he counted down for the launch of the experimental aircraft after making sure everything and everyone was `ready.' The P2B was used in the launching of the D-558s while the B-29 carried the X-1s to altitude for drops. Stan was pilot of the P2B for 1 drop of the D-558-II #1 (1951 - 1954), 63 drops of the D-558-II #2 (1951 - 1956), and 38 drops of the D-558-II #3 (1951 - 1956). As pilot of the B-29 Stan flew for 1 drop of the Bell X-1A (1955), 13 drops of the Bell X-1B (1956-1958) and 22 drops of the X-1E (1955 - 1958). During the lifting body tow tests Stan was pilot of the R4D that towed the M2-F1 to altitude for release. He made 14 tows in 1966. On June 13, 1966, Stanley P. Butchart became the Chief Pilot at the National Aeronautics and Space Administrations' Flight Research Center and a few weeks later was named Acting Director of Flight Operations. There were 6 pilots assigned to the flight office at this time. On December 10, 1966, Stan became Chief of Flight Operations a position he held until his retirement on February 27, 1976. Stan authored several reports and presented research papers. He is a charter member of the Society of Experimental Test Pilots that had a membership of 65 in 1955, when chartered. Stan was elected to be a Fellow and had the honor of being the President in 1980. Butchart was presented the NACA Exceptional Service Medal for his decisions and actions in the X-1A explosion while attached to the B-29 aircraft on August 8, 1955.
NASA and ISS Winner of 2009 Collier Trophy
2010-05-12
NASA and the International Space Station (ISS) team is selected as the recipient of the 2009 Robert J. Collier Trophy on Thursday, May 13, 2010, in Arlington, VA. Lori Garver, fourth from left, Deputy Administrator of NASA accepts the Collier Trophy on behalf of NASA. The ISS Team nomination consisted NASA, The Boeing Company, Draper Laboratory, Honeywell, Lockheed Martin Corporation, United Space Alliance, and United Technologies/Hamilton Sunstrand. Seen from left are: Virginia Barnes, President and CEO, United Space Alliance; Alain Bellemare, President, United Technologies/Hamilton Sunstrand; James Crocker, VP and GM, Sensing & Exploration, Lockheed Martin; Lori Garver; Wayne Boyne, Chairman, National Aeronautic Association; Jonathan Gaffney, President, National Aeronautic Association; Jim Albaugh, Executive VP of The Boeing Company, President and CEO of Boeing Commercial Airplanes; Dennis Muilenberg, Executive Vice President, The Boeing Company, President and CEO, Boeing Defense, Space and Security; James Shields, President and CEO, Draper Laboratory and Dave Douglas, Vice President, Space, Missiles and Munitions, Honeywell. Photo Credit: (NASA/Carla Cioffi)
14 CFR 129.117 - Flammability reduction means.
Code of Federal Regulations, 2010 CFR
2010-01-01
... requirements of § 26.33 of this chapter is operational. Table 1 Model—Boeing Model—Airbus 747 Series A318, A319.... Table 2 Model—Boeing Model—Airbus 747 Series A318, A319, A320, A321 Series 737 Series A300, A310 Series... modified to comply with § 26.33(c) of this chapter. Table 3 Model—Boeing Model—Airbus 747 Series A318, A319...
14 CFR 129.117 - Flammability reduction means.
Code of Federal Regulations, 2011 CFR
2011-01-01
... requirements of § 26.33 of this chapter is operational. Table 1 Model—Boeing Model—Airbus 747 Series A318, A319.... Table 2 Model—Boeing Model—Airbus 747 Series A318, A319, A320, A321 Series 737 Series A300, A310 Series... modified to comply with § 26.33(c) of this chapter. Table 3 Model—Boeing Model—Airbus 747 Series A318, A319...
14 CFR 129.117 - Flammability reduction means.
Code of Federal Regulations, 2013 CFR
2013-01-01
... requirements of § 26.33 of this chapter is operational. Table 1 Model—Boeing Model—Airbus 747 Series A318, A319.... Table 2 Model—Boeing Model—Airbus 747 Series A318, A319, A320, A321 Series 737 Series A300, A310 Series... modified to comply with § 26.33(c) of this chapter. Table 3 Model—Boeing Model—Airbus 747 Series A318, A319...
2012-08-02
CAPE CANAVERAL, Fla. -- John Tribe, retired chief engineer for Boeing/Rockwell Launch Support Services, speaks to about 45 of NASA’s social media followers for two days of presentations on the Kennedy Space Center's past, present and future. The social media participants gathered at the Florida spaceport on Aug. 2 and 3, 2012 to hear from key former and current leaders who related stories of the space agency's efforts to explore the unknown. It was the first social media event totally run by Kennedy. Photo credit: NASA/ Gianni Woods
The Iron Triangle Manifested: U.S. Air Force Tanker Lease 2001-2005 Case Study
2012-01-01
own experts along with participants from Boeing and Rockwell to perform the KC–135 Economic Service Life Study ( ESLS ). Based on usage at that time...General John D. Ryan stated a replacement program would start in the next 15 years.9 2 Punjani The ESLS pre-dated 9/11 and did not account for...increased flight hours due to homeland defense air patrols and the war in Afghanistan. Usage rates increased from the ESLS -report- ed figure of 308 hours per
1994-02-01
awarded in 1984 to Martin Marietta Data System. A one-year extension to this contract has been approved, with the option of an additional year, if needed...remaining enhancements currently available with the Increment I software. B. Contracts: Martin Marietta , Information Systems Group is the systems...0016-Boeing Information Services Inc. DCA100-94-D-0017-Electronic Data Systems Corporation DCA100-94-D-0018- Martin Marietta Technical Svcs, Inc. DCA100
1998-11-12
In the Payload Hazardous Service Facility, the Stardust spacecraft sits wrapped in plastic covering. Built by Lockheed Martin Astronautics near Denver, Colo., for the Jet Propulsion Laboratory (JPL) and NASA, the spacecraft Stardust will use a unique medium called aerogel to capture comet particles and interstellar dust for later analysis. Stardust will be launched aboard a Boeing Delta 7426 rocket targeted for Feb. 6, 1999. The collected samples will return to Earth in a re-entry capsule to be jettisoned from Stardust as it swings by Earth in January 2006
1998-12-02
In the Payload Hazardous Servicing Facility, workers install a science panel on the spacecraft Stardust. Scheduled to be launched aboard a Boeing Delta 7426 rocket from Complex 17, Cape Canaveral Air Station, on Feb. 6, 1999, Stardust will use a unique medium called aerogel to capture comet particles flying off the nucleus of comet Wild 2 in January 2004, plus collect interstellar dust for later analysis. The collected samples will return to Earth in a re-entry capsule to be jettisoned as it swings by Earth in January 2006
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Technicians on Pad 17-A, Cape Canaveral Air Force Station, work on the bottom of the Solid Rocket Booster for the Swift-Delta launch before the SRB is raised into the mobile service tower. The SRB is one of three to be attached to the Boeing Delta rocket that is the launch vehicle for the Swift spacecraft and its Gamma-Ray Burst Mission. Swift is a medium-class Explorer mission managed by NASAs Goddard Space Flight Center in Greenbelt, Md.
2007-04-26
KENNEDY SPACE CENTER, FLA. -- Peter Diamandis (left), founder of the Zero Gravity Corp., and noted physicist Stephen Hawking move away from Zero G's modified Boeing 727 on the runway at the Kennedy Space Center's Shuttle Landing Facility. Hawking enjoyed his first zero gravity flight provided by Zero G. At the celebration of his 65th birthday on January 8 this year, Hawking announced his plans for a zero-gravity flight to prepare for a sub-orbital space flight in 2009 on Virgin Galactic's space service. Photo credit: NASA/Kim Shiflett
2004-06-22
KENNEDY SPACE CENTER, FLA. - At Space Launch Complex 2 on North Vandenberg Air Force Base, Calif., the Aura spacecraft is lifted up the mobile service tower, or gantry. The latest in the Earth Observing System (EOS) series, Aura is scheduled to launch July 10 aboard the Boeing Delta II rocket. Aura’s four state-of-the-art instruments will study the dynamics of chemistry occurring in the atmosphere. The spacecraft will provide data to help scientists better understand the Earth’s ozone, air quality and climate change.
2004-06-22
KENNEDY SPACE CENTER, FLA. - At Space Launch Complex 2 on North Vandenberg Air Force Base, Calif., the Aura spacecraft is prepared for its lift up the mobile service tower, or gantry. The latest in the Earth Observing System (EOS) series, Aura is scheduled to launch July 10 aboard the Boeing Delta II rocket. Aura’s four state-of-the-art instruments will study the dynamics of chemistry occurring in the atmosphere. The spacecraft will provide data to help scientists better understand the Earth’s ozone, air quality and climate change.
2004-06-22
KENNEDY SPACE CENTER, FLA. - At Space Launch Complex 2 on North Vandenberg Air Force Base, Calif., the Aura spacecraft arrives at the base of the mobile service tower, or gantry. The latest in the Earth Observing System (EOS) series, Aura is scheduled to launch July 10 aboard the Boeing Delta II rocket. Aura’s four state-of-the-art instruments will study the dynamics of chemistry occurring in the atmosphere. The spacecraft will provide data to help scientists better understand the Earth’s ozone, air quality and climate change.
2004-07-06
KENNEDY SPACE CENTER, FLA. - The Boeing Delta II Heavy second-stage engine, the Aerojet AJ10-118K, is lifted up the mobile service tower at Pad 17-B, Cape Canaveral Air Force Station. The Delta II is the launch vehicle for the MESSENGER (Mercury Surface, Space Environment, Geochemistry and Ranging) spacecraft, scheduled to lift off Aug. 2. Bound for Mercury, the spacecraft is expected to reach orbit around the planet in March 2011. MESSENGER was built for NASA by the Johns Hopkins University Applied Physics Laboratory in Laurel, Md.
NASA Technical Reports Server (NTRS)
Nylen, W. E.
1974-01-01
Guest pilot evaluation results of an approach profile modification for reducing ground level noise under the approach of jet aircraft runways are reported. Evaluation results were used to develop a two segmented landing approach procedure and equipment necessary to obtain pilot, airline, and FAA acceptance of the two segmented flight as a routine way of operating aircraft on approach and landing. Data are given on pilot workload and acceptance of the procedure.
2006-07-13
KENNEDY SPACE CENTER, FLA. - With guidelines attached, the second stage of the Boeing Delta II rocket is lifted by a crane toward the mobile service tower on Launch Pad 17-B on Cape Canaveral Air Force Station. The second stage then will be lifted into the mobile service tower and mated with first stage already in place. STEREO stands for Solar Terrestrial Relations Observatory and comprises two spacecraft. The STEREO mission is the first to take measurements of the sun and solar wind in 3-dimension. This new view will improve our understanding of space weather and its impact on the Earth. STEREO is expected to lift off in August 2006. Photo credit: NASA/George Shelton
1999-02-25
KENNEDY SPACE CENTER, FLA. -- Cutting a red ribbon for the unveiling of a newly renovated altitude chamber are (left to right) Tommy Mack, project manager, NASA; Steve Francois, director, Space Station and Shuttle Payloads; Sterling Walker, director, Engineering Development; Roy Bridges, director, Kennedy Space Center; Jay Greene, International Space Station manager for Technical; Michael Terry, project manager, Boeing; and Terry Smith, director of Engineering, Boeing Space Coast Operations. The chamber was reactivated, after a 24-year hiatus, to perform leak tests on International Space Station pressurized modules at the launch site. Originally, two chambers were built to test the Apollo command and lunar service modules. They were last used in 1975 during the Apollo-Soyuz Test Project. After installation of new vacuum pumping equipment and controls, a new control room, and a new rotation handling fixture, the chamber again became operational in February 1999. The chamber, which is 33 feet in diameter and 50 feet tall, is constructed of stainless steel. The first module that will be tested for leaks is the U.S. Laboratory. No date has been determined for the test
The ribbon-cutting ceremony unveils the reactivated altitude chamber inside the O&C high bay
NASA Technical Reports Server (NTRS)
1999-01-01
Cutting a red ribbon for the unveiling of a newly renovated altitude chamber are (left to right) Tommy Mack, project manager, NASA; Steve Francois, director, Space Station and Shuttle Payloads; Sterling Walker, director, Engineering Development; Roy Bridges, director, Kennedy Space Center; Jay Greene, International Space Station manager for Technical; Michael Terry, project manager, Boeing; and Terry Smith, director of Engineering, Boeing Space Coast Operations. The chamber was reactivated, after a 24-year hiatus, to perform leak tests on International Space Station pressurized modules at the launch site. Originally, two chambers were built to test the Apollo command and lunar service modules. They were last used in 1975 during the Apollo-Soyuz Test Project. After installation of new vacuum pumping equipment and controls, a new control room, and a new rotation handling fixture, the chamber again became operational in February 1999. The chamber, which is 33 feet in diameter and 50 feet tall, is constructed of stainless steel. The first module that will be tested for leaks is the U.S. Laboratory. No date has been determined for the test.
Aerospace industry representatives view actual and mock-up versions of 'X-Planes' intended to enhanc
NASA Technical Reports Server (NTRS)
2000-01-01
Aerospace industry representatives view actual and mock-up versions of 'X-Planes' intended to enhance access to space during a technical exposition on June 22, 2000 at Dryden Flight Research Center, Edwards, California. From left to right: NASA's B-52 launch aircraft, in service with NASA since 1959; a neutral-buoyancy model of the Boeing's X-37; the Boeing X-40A behind the MicroCraft X-43 mock-up; Orbital Science's X-34 and the modified Lockheed L-1011 airliner that was to launch the X-34. These X-vehicles are part of NASA's Access to Space plan intended to bring new technologies to bear in an effort to dramatically lower the cost of putting payloads in space, and near-space environments. The June 22, 2000 NASA Reusable Launch Vehicle (RLV) Technology Exposition included presentations on the history, present, and future of NASA's RLV program. Special Sessions for industry representatives highlighted the X-37 project and its related technologies. The X-37 project is managed by NASA's Marshall Space Flight Center, Huntsville, Alabama.
At NASA Dryden, Aerospace industry representatives view actual and mock-up versions of 'X-Planes' in
NASA Technical Reports Server (NTRS)
2000-01-01
Aerospace industry representatives view actual and mock-up versions of 'X-Planes' intended to enhance access to space during a technical exposition on June 22, 2000 at Dryden Flight Research Center, Edwards, California. From left to right: NASA's B-52 launch aircraft, in service with NASA since 1959; a neutral-buoyancy model of the Boeing's X-37; the Boeing X-40A behind the MicroCraft X-43 mock-up; Orbital Science's X-34 and the modified Lockheed L-1011 airliner that was to launch the X-34. These X-vehicles are part of NASA's Access to Space plan intended to bring new technologies to bear in an effort to dramatically lower the cost of putting payloads in space, and near-space environments. The June 22, 2000 NASA Reusable Launch Vehicle (RLV) Technology Exposition included presentations on the history, present, and future of NASA's RLV program. Special Sessions for industry representatives highlighted the X-37 project and its related technologies. The X-37 project is managed by NASA's Marshall Space Flight Center, Huntsville, Alabama.
Computer aided radiation analysis for manned spacecraft
NASA Technical Reports Server (NTRS)
Appleby, Matthew H.; Griffin, Brand N.; Tanner, Ernest R., II; Pogue, William R.; Golightly, Michael J.
1991-01-01
In order to assist in the design of radiation shielding an analytical tool is presented that can be employed in combination with CAD facilities and NASA transport codes. The nature of radiation in space is described, and the operational requirements for protection are listed as background information for the use of the technique. The method is based on the Boeing radiation exposure model (BREM) for combining NASA radiation transport codes and CAD facilities, and the output is given as contour maps of the radiation-shield distribution so that dangerous areas can be identified. Computational models are used to solve the 1D Boltzmann transport equation and determine the shielding needs for the worst-case scenario. BREM can be employed directly with the radiation computations to assess radiation protection during all phases of design which saves time and ultimately spacecraft weight.
A Preliminary Ship Design Model for Cargo Throughput Optimization
2014-06-01
708 Boeing Jetfoil 929- 100 [24] 110 107 50 25.72 5534 44 MALAYSIA: 35.6 m Monohull [25] 25 24 40 20.58 1618 Patricia Olivia II [21] 202 197 57...17.153 Gomel Polesye 3.5036 19.145 Gomel Byelorus 3.5909 22.620 Boeing Jetfoil 929-100 3.7673 14.399 MALAYSIA: 35.6 m Monohull 3.8580 22.079... Boeing Jetfoil 920-100 % % MALAYSIA: 35.6 m Monohull % % Patricia Olivia
77 FR 46343 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-03
... certain The Boeing Company Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747-400, 747-400D, 747-400F, 747SR, and 747SP series airplanes; and certain Model 757-200, -200PF, and... applies to The Boeing Company Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300...
Dual-band infrared (DBIR) imaging inspections of Boeing 737 and KC-135 aircraft panels
DOE Office of Scientific and Technical Information (OSTI.GOV)
Del Grande, N.K.; Dolan, K.W.; Durbin, P.F.
1993-08-27
We apply dual-band infrared (DBIR) imaging as a dynamic thermal tomography tool for wide area inspection of a Boeing 737 aircraft, and several Boeing KC-135 aircraft panels. Our analyses are discussed in this report. After flash-heating the aircraft skin, we record synchronized DBIR images every 40 ms, from onset to 8 seconds after the heat flash. We analyze selective DBIR image ratios which enhance surface temperature contrast and remove surface-emissivity clutter (from dirt, dents, tape, markings, ink, sealants, uneven paint, paint stripper, exposed metal and roughness variations). The Boeing 737 and KC-135 aircraft fuselage panels have varying percent thickness lossesmore » from corrosion. We established the correlation of percent thickness loss with surface temperature rise (above ambient) for a partially corroded F-18 wing box structure and several aluminum reference panels. Based on this correlation, lap splice temperatures rise 1{degrees}C per 24 {plus_minus} 5 % material loss at 0.4 s after the heat flash. We show tables, charts and temperature maps of typical lap splice material losses for the riveted (and bonded) Boeing 737, and the riveted (but unbonded) Boeing KC-135. We map the fuselage composite thermal inertia, based on the (inverse) slope of the surface temperature versus inverse square root of time. Composite thermal inertia maps characterize shallow skin defects within the lap splice at early times (<0.3 s) and deeper skin defects within the lap splice at late times (>0.4 s). Late time composite thermal inertia maps depict where corrosion-related thickness losses occur. Lap splice sites on a typical Boeing KC-135 panel with low composite thermal inertia values had high skin-thickness losses from corrosion.« less
Dynamic thermal tomography for nondestructive inspection of aging aircraft
DOE Office of Scientific and Technical Information (OSTI.GOV)
Del Grande, N.K.; Dolan, K.W.; Durbin, P.F.
1993-11-01
The authors apply dual-band infrared (DBIR) imaging as a dynamic thermal tomography tool for wide area inspection of a Boeing 737 aircraft and several Boeing KC-135 aircraft panels. The analyses are discussed in this report. After flash-heating the aircraft skin, they record synchronized DBIR images every 40 ms, from onset to 8 seconds after the heat flash. They analyze selective DBIR image ratios which enhance surface temperature contrast and remove surface-emissivity clutter. The Boeing 737 and KC-135 aircraft fuselage panels have varying percent thickness losses from corrosion. They established the correlation of percent thickness loss with surface temperature rise (abovemore » ambient) for a partially corroded F-18 wing box structure and several aluminum plates which had 6 to 60% thickness losses at milled flat-bottom hole sites. Based on this correlation, lap splice temperatures rise 1C per 24 {plus_minus} 5% material loss at 0.4 s after the heat flash. They tabulate and map corrosion-related percent thickness loss effects for the riveted Boeing 737, and the riveted Boeing KKC-135. They map the fuselage composite thermal inertia, based on the (inverse) slope of the surface temperature versus inverse square root of time. Composite thermal inertia maps characterized shallow skin defects within the lap splice at early times (< 0.3 s) and deeper skin defects within the lap splice at late times (> 0.4 s). Late time composite thermal inertia maps depict where corrosion-related thickness losses occur (e.g., on the inside of the Boeing 737 lap splice, beneath the galley and the latrine). Lap splice sites on a typical Boeing KC-135 panel with low composite thermal inertia values had high skin-thickness losses from corrosion.« less
Research study on antiskid braking systems for the space shuttle
NASA Technical Reports Server (NTRS)
Auselmi, J. A.; Weinberg, L. W.; Yurczyk, R. F.; Nelson, W. G.
1973-01-01
A research project to investigate antiskid braking systems for the space shuttle vehicle was conducted. System from the Concorde, Boeing 747, Boeing 737, and Lockheed L-1011 were investigated. The characteristics of the Boeing 737 system which caused it to be selected are described. Other subjects which were investigated are: (1) trade studies of brake control concepts, (2) redundancy requirements trade study, (3) laboratory evaluation of antiskid systems, and (4) space shuttle hardware criteria.
Simultaneous cabin and ambient ozone measurements on two Boeing 747 airplanes, volume 1
NASA Technical Reports Server (NTRS)
Perkins, P. J.; Holdeman, J. D.; Nastrom, G. D.
1979-01-01
Measurements of zone concentrations both outside and in the cabin of an airline operated Boeing 747SP and Boeing 747-100 airliner are presented. Plotted data and the corresponding tables of observations taken at altitude between the departure and destination airports of each flight are arranged chronologically for the two aircraft. Data were taken at five or ten minute intervals by automated instrumentation used in the NACA Global Atmospheric Sampling Program.
2014-02-01
First Lady, and Second Lady. Other than the President, who travels exclusively on VC-25 aircraft ( Boeing 747 aircraft designated as Air Force One when...to a Boeing 757). Figure 1 show examples of these aircraft...Aircraft 2008 Rate 2009 Rate 2010 Rate 2011 Rate 2012 Rate C-20B (Gulfstream III) $5,279 $6,210 $3,953 $5,188 $5,475 C-32A ( Boeing 757) 18,418 12,202
PARTNER Project 8: Sonic boom mitigation
NASA Astrophysics Data System (ADS)
Sparrow, Victor W.
2005-09-01
Current U.S. and international laws prohibit commercial supersonic flight over land due to the impact of conventional sonic boom noise. Aircraft manufacturers, however, now have modern computational fluid dynamics and optimization tools, unavailable when those laws were enacted, that will allow them to design and build aircraft with boom signatures that are substantially smoothed compared with traditional N-waves. One purpose of the FAA/NASA/Transport Canada PARTNER Center of Excellence Project 8 is to determine exactly which waveforms would be heard by the public if low-boom supersonic aircraft are put into service. Another purpose is to ascertain the acceptability of those waveforms. The project involves the following universities, government, and industry partners: Penn State, Purdue, Stanford, the National Aeronautics and Space Administration, the Federal Aviation Administration, Boeing, Cessna, Gulfstream, Lockheed-Martin, and Wyle Laboratories. Some of the initial project work includes studies on the propagation of sonic booms through atmospheric turbulence, on the mutual reproducibility of three sonic boom simulators, and on the realism of those simulators as determined by expert listeners. The results of all the studies are intended to provide the FAA with new data to reassess current regulations. [Work supported by NASA, the FAA, and the PARTNER industrial partners.
Flight deck magnetic fields in commercial aircraft.
Nicholas, J S; Butler, G C; Lackland, D T; Hood, W C; Hoel, D G; Mohr, L C
2000-11-01
Airline pilots are exposed to magnetic fields generated by the aircraft's electrical system. The objectives of this study were (1) to directly measure flight deck magnetic fields in terms of personal exposure to the pilots when flying on different aircraft types over a 75-hour flight-duty month, and (2) to compare magnetic field exposures across flight deck types and job titles. Measurements were taken using personal dosimeters carried by either the Captain or the First Officer on Boeing 737/200, Boeing 747/400, Boeing 767/300ER, and Airbus 320 aircraft. Approximately 1,008 block hours were recorded at a sampling frequency of 3 seconds. Total block time exposure to the pilots ranged from a harmonic geometric mean of 6.7 milliGauss (mG) for the Boeing 767/300ER to 12.7 mG for the Boeing 737/200. Measured flight deck magnetic field levels were substantially above the 0.8-1 mG level typically found in the home or office and suggest the need for further study to evaluate potential health effects of long-term exposure. Copyright 2000 Wiley-Liss, Inc.
2012-08-23
CAPE CANAVERAL, Fla. – Space Florida President Frank DiBello, NASA Administrator Charlie Bolden, and Boeing's Vice President and General Manager of Space Exploration John Elbon address the media inside Orbiter Processing Facility-3, or OPF-3, at NASA's Kennedy Space Center in Florida. Bolden took a few dozen media on a road show tour of the center and adjacent Cape Canaveral Air Force Station to show the progress being made for future government and commercial space endeavors that will begin from Florida's Space Coast. Boeing is leasing OPF-3 through an agreement with Space Florida for the manufacturing and assembly of its CST-100 spacecraft, which is under development in collaboration with NASA's Commercial Crew Program. During his tour, Bolden announced that Space Exploration Technologies, or SpaceX, has completed its Space Act Agreement with NASA for Commercial Orbital Transportation Services. SpaceX is scheduled to launch the first of its 12 contracted cargo flights to the space station from Cape Canaveral this October, under NASA’s Commercial Resupply Services Program. Bolden also announced NASA partner Sierra Nevada Corp. has conducted its first milestone under the agency’s recently announced Commercial Crew Integrated Capability CCiCap initiative. The milestone, a program implementation plan review, marks an important first step in Sierra Nevada’s efforts to develop a crew transportation system with its Dream Chaser spacecraft. Through NASA’s commercial space initiatives and programs, the agency is providing investments to stimulate the American commercial space industry. Photo credit: NASA/Kim Shiflett
2012-08-23
CAPE CANAVERAL, Fla. – Space Florida President Frank DiBello, NASA Administrator Charlie Bolden, and Boeing's Vice President and General Manager of Space Exploration John Elbon address the media inside Orbiter Processing Facility-3, or OPF-3, at NASA's Kennedy Space Center in Florida. Bolden took a few dozen media on a road show tour of the center and adjacent Cape Canaveral Air Force Station to show the progress being made for future government and commercial space endeavors that will begin from Florida's Space Coast. Boeing is leasing OPF-3 through an agreement with Space Florida for the manufacturing and assembly of its CST-100 spacecraft, which is under development in collaboration with NASA's Commercial Crew Program. During his tour, Bolden announced that Space Exploration Technologies, or SpaceX, has completed its Space Act Agreement with NASA for Commercial Orbital Transportation Services. SpaceX is scheduled to launch the first of its 12 contracted cargo flights to the space station from Cape Canaveral this October, under NASA’s Commercial Resupply Services Program. Bolden also announced NASA partner Sierra Nevada Corp. has conducted its first milestone under the agency’s recently announced Commercial Crew Integrated Capability CCiCap initiative. The milestone, a program implementation plan review, marks an important first step in Sierra Nevada’s efforts to develop a crew transportation system with its Dream Chaser spacecraft. Through NASA’s commercial space initiatives and programs, the agency is providing investments to stimulate the American commercial space industry. Photo credit: NASA/Kim Shiflett
2012-08-23
CAPE CANAVERAL, Fla. – NASA Administrator Charlie Bolden, right, and Boeing's Vice President and General Manager of Space Exploration John Elbon address the media inside Orbiter Processing Facility-3, or OPF-3, at NASA's Kennedy Space Center in Florida. Bolden took a few dozen media on a road show tour of the center and adjacent Cape Canaveral Air Force Station to show the progress being made for future government and commercial space endeavors that will begin from Florida's Space Coast. Boeing is leasing OPF-3 through an agreement with Space Florida for the manufacturing and assembly of its CST-100 spacecraft, which is under development in collaboration with NASA's Commercial Crew Program. During his tour, Bolden announced that Space Exploration Technologies, or SpaceX, has completed its Space Act Agreement with NASA for Commercial Orbital Transportation Services. SpaceX is scheduled to launch the first of its 12 contracted cargo flights to the space station from Cape Canaveral this October, under NASA’s Commercial Resupply Services Program. Bolden also announced NASA partner Sierra Nevada Corp. has conducted its first milestone under the agency’s recently announced Commercial Crew Integrated Capability CCiCap initiative. The milestone, a program implementation plan review, marks an important first step in Sierra Nevada’s efforts to develop a crew transportation system with its Dream Chaser spacecraft. Through NASA’s commercial space initiatives and programs, the agency is providing investments to stimulate the American commercial space industry. Photo credit: NASA/Kim Shiflett
2012-08-23
CAPE CANAVERAL, Fla. – Space Florida President Frank DiBello, NASA Administrator Charlie Bolden, and Boeing's Vice President and General Manager of Space Exploration John Elbon address the media inside Orbiter Processing Facility-3, or OPF-3, at NASA's Kennedy Space Center in Florida. Bolden took a few dozen media on a road show tour of the center and adjacent Cape Canaveral Air Force Station to show the progress being made for future government and commercial space endeavors that will begin from Florida's Space Coast. Boeing is leasing OPF-3 through an agreement with Space Florida for the manufacturing and assembly of its CST-100 spacecraft, which is under development in collaboration with NASA's Commercial Crew Program. During his tour, Bolden announced that Space Exploration Technologies, or SpaceX, has completed its Space Act Agreement with NASA for Commercial Orbital Transportation Services. SpaceX is scheduled to launch the first of its 12 contracted cargo flights to the space station from Cape Canaveral this October, under NASA’s Commercial Resupply Services Program. Bolden also announced NASA partner Sierra Nevada Corp. has conducted its first milestone under the agency’s recently announced Commercial Crew Integrated Capability CCiCap initiative. The milestone, a program implementation plan review, marks an important first step in Sierra Nevada’s efforts to develop a crew transportation system with its Dream Chaser spacecraft. Through NASA’s commercial space initiatives and programs, the agency is providing investments to stimulate the American commercial space industry. Photo credit: NASA/Kim Shiflett
2012-08-23
CAPE CANAVERAL, Fla. – Space Florida President Frank DiBello, NASA Administrator Charlie Bolden, and Boeing's Vice President and General Manager of Space Exploration John Elbon address the media inside Orbiter Processing Facility-3, or OPF-3, at NASA's Kennedy Space Center in Florida. Bolden took a few dozen media on a road show tour of the center and adjacent Cape Canaveral Air Force Station to show the progress being made for future government and commercial space endeavors that will begin from Florida's Space Coast. Boeing is leasing OPF-3 through an agreement with Space Florida for the manufacturing and assembly of its CST-100 spacecraft, which is under development in collaboration with NASA's Commercial Crew Program. During his tour, Bolden announced that Space Exploration Technologies, or SpaceX, has completed its Space Act Agreement with NASA for Commercial Orbital Transportation Services. SpaceX is scheduled to launch the first of its 12 contracted cargo flights to the space station from Cape Canaveral this October, under NASA’s Commercial Resupply Services Program. Bolden also announced NASA partner Sierra Nevada Corp. has conducted its first milestone under the agency’s recently announced Commercial Crew Integrated Capability CCiCap initiative. The milestone, a program implementation plan review, marks an important first step in Sierra Nevada’s efforts to develop a crew transportation system with its Dream Chaser spacecraft. Through NASA’s commercial space initiatives and programs, the agency is providing investments to stimulate the American commercial space industry. Photo credit: NASA/Kim Shiflett
2012-08-23
CAPE CANAVERAL, Fla. – Space Florida President Frank DiBello, NASA Administrator Charlie Bolden, and Boeing's Vice President and General Manager of Space Exploration John Elbon address the media inside Orbiter Processing Facility-3, or OPF-3, at NASA's Kennedy Space Center in Florida. Bolden took a few dozen media on a road show tour of the center and adjacent Cape Canaveral Air Force Station to show the progress being made for future government and commercial space endeavors that will begin from Florida's Space Coast. Boeing is leasing OPF-3 through an agreement with Space Florida for the manufacturing and assembly of its CST-100 spacecraft, which is under development in collaboration with NASA's Commercial Crew Program. During his tour, Bolden announced that Space Exploration Technologies, or SpaceX, has completed its Space Act Agreement with NASA for Commercial Orbital Transportation Services. SpaceX is scheduled to launch the first of its 12 contracted cargo flights to the space station from Cape Canaveral this October, under NASA’s Commercial Resupply Services Program. Bolden also announced NASA partner Sierra Nevada Corp. has conducted its first milestone under the agency’s recently announced Commercial Crew Integrated Capability CCiCap initiative. The milestone, a program implementation plan review, marks an important first step in Sierra Nevada’s efforts to develop a crew transportation system with its Dream Chaser spacecraft. Through NASA’s commercial space initiatives and programs, the agency is providing investments to stimulate the American commercial space industry. Photo credit: NASA/Kim Shiflett
2012-08-23
CAPE CANAVERAL, Fla. – Space Florida President Frank DiBello, NASA Administrator Charlie Bolden, and Boeing's Vice President and General Manager of Space Exploration John Elbon address the media inside Orbiter Processing Facility-3, or OPF-3, at NASA's Kennedy Space Center in Florida. Bolden took a few dozen media on a road show tour of the center and adjacent Cape Canaveral Air Force Station to show the progress being made for future government and commercial space endeavors that will begin from Florida's Space Coast. Boeing is leasing OPF-3 through an agreement with Space Florida for the manufacturing and assembly of its CST-100 spacecraft, which is under development in collaboration with NASA's Commercial Crew Program. During his tour, Bolden announced that Space Exploration Technologies, or SpaceX, has completed its Space Act Agreement with NASA for Commercial Orbital Transportation Services. SpaceX is scheduled to launch the first of its 12 contracted cargo flights to the space station from Cape Canaveral this October, under NASA’s Commercial Resupply Services Program. Bolden also announced NASA partner Sierra Nevada Corp. has conducted its first milestone under the agency’s recently announced Commercial Crew Integrated Capability CCiCap initiative. The milestone, a program implementation plan review, marks an important first step in Sierra Nevada’s efforts to develop a crew transportation system with its Dream Chaser spacecraft. Through NASA’s commercial space initiatives and programs, the agency is providing investments to stimulate the American commercial space industry. Photo credit: NASA/Kim Shiflett
2012-08-23
CAPE CANAVERAL, Fla. – Space Florida President Frank DiBello, NASA Administrator Charlie Bolden, and Boeing's Vice President and General Manager of Space Exploration John Elbon address the media inside Orbiter Processing Facility-3, or OPF-3, at NASA's Kennedy Space Center in Florida. Bolden took a few dozen media on a road show tour of the center and adjacent Cape Canaveral Air Force Station to show the progress being made for future government and commercial space endeavors that will begin from Florida's Space Coast. Boeing is leasing OPF-3 through an agreement with Space Florida for the manufacturing and assembly of its CST-100 spacecraft, which is under development in collaboration with NASA's Commercial Crew Program. During his tour, Bolden announced that Space Exploration Technologies, or SpaceX, has completed its Space Act Agreement with NASA for Commercial Orbital Transportation Services. SpaceX is scheduled to launch the first of its 12 contracted cargo flights to the space station from Cape Canaveral this October, under NASA’s Commercial Resupply Services Program. Bolden also announced NASA partner Sierra Nevada Corp. has conducted its first milestone under the agency’s recently announced Commercial Crew Integrated Capability CCiCap initiative. The milestone, a program implementation plan review, marks an important first step in Sierra Nevada’s efforts to develop a crew transportation system with its Dream Chaser spacecraft. Through NASA’s commercial space initiatives and programs, the agency is providing investments to stimulate the American commercial space industry. Photo credit: NASA/Kim Shiflett
NASA Technical Reports Server (NTRS)
Keymeulen, Didier; Ferguson, Michael I.; Fink, Wolfgang; Oks, Boris; Peay, Chris; Terrile, Richard; Cheng, Yen; Kim, Dennis; MacDonald, Eric; Foor, David
2005-01-01
We propose a tuning method for MEMS gyroscopes based on evolutionary computation to efficiently increase the sensitivity of MEMS gyroscopes through tuning. The tuning method was tested for the second generation JPL/Boeing Post-resonator MEMS gyroscope using the measurement of the frequency response of the MEMS device in open-loop operation. We also report on the development of a hardware platform for integrated tuning and closed loop operation of MEMS gyroscopes. The control of this device is implemented through a digital design on a Field Programmable Gate Array (FPGA). The hardware platform easily transitions to an embedded solution that allows for the miniaturization of the system to a single chip.
78 FR 14734 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-07
... acceptable if that review conclusively determines the serial number of the horizontal stabilizer. STC Winglet Comment Aviation Partners Boeing stated that the installation of winglets per Supplemental Type...
NASA Technical Reports Server (NTRS)
Gabel, R.; Lang, P. F.; Smith, L. A.; Reed, D. A.
1989-01-01
Boeing Helicopter, together with other United States helicopter manufacturers, participated in a finite element applications program to emplace in the United States a superior capability to utilize finite element analysis models in support of helicopter airframe design. The activities relating to planning and creating a finite element vibrations model of the Boeing Model 36-0 composite airframe are summarized, along with the subsequent analytical correlation with ground shake test data.
Study and Evaluation of Current and Future Aircraft Loaders
1986-08-01
Tigers Airlines JFK Airport , NY 10 Feb 86 Boeing Military Airplane Co. Boeing Commercial Airplane Co. Seattle, WA 11 Feb 86 Korean Airlines LAX, CA 12...Nash Boeing Aircraft Co., Seattle, WA Mr. J. Nelson JFK Airport , NY Mr. P. O’Brien ASD/ENCA Wright-Patterson AFB, OH Mr. C. Outran HQ AFLC/DSTMA...Locations 15 Oct 85 TWA Freight Terminal Laimbert Int’l Airport , St. Louis, mO 22 Nov 85 Lockheed - Georgia Aircraft Co. Marietta, GA 13 Dec 85 Flying
Boeing 747 jet modified to carry shuttle en route to Dryden
NASA Technical Reports Server (NTRS)
1977-01-01
A Boeing 747 jet aircraft, modified for use by NASA for the Space Shuttle Orbiter Approach and Landing Tests (ALTs), is seen en route from the Boeing facility at Seattle, Washington, to the Dryden Flight Research Center in Southern California. Note the added structural supports atop the huge aircraft. The Shuttle Orbiter will ride 'piggy-back' atop the NASA 747 for the ALTs. The NASA 747 will be used also to transport Orbiters to the Space Shuttle launch sites.
Eric Boe and Bob Behnken Dragon Tour
2017-03-08
Astronaut Bob Behnken emerges from the hatch of a SpaceX Crew Dragon spacecraft in manufacturing at SpaceX's headquarters and factory in Hawthorne, California. Behnken is one of four NASA astronauts selected to train with Boeing and SpaceX ahead of flight tests for NASA's Commercial Crew Program. Along with Behnken, Eric Boe, Doug Hurley and Suni Williams are working with the companies on their independent spacecraft and launch vehicles being developed to take astronauts to the International Space Station. Photo credit: SpaceX
77 FR 71485 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-03
..., August 21, 2012) and the FAA's response to the comment. Statement Regarding Installation of Winglets Aviation Partners Boeing (APB) stated that the installation of winglets per Supplemental Type Certificate...
Unstructured-grid methods development: Lessons le arned
NASA Technical Reports Server (NTRS)
Batina, John T.
1991-01-01
The development is summarized of unstructured grid methods for the solution of the equations of fluid flow and some of the lessons learned are shared. The 3-D Euler equations are solved, including spatial discretizations, temporal discretizations, and boundary conditions. An example calculation with an upwind implicit method using a CFL (Courant Friedricks Lewy) number of infinity is presented for the Boeing 747 aircraft. The results obtained in less than one hour of CPU time on a Cray-2 computer, thus demonstrating the speed and robustness of the present capability.
Launch Services, a Proven Model
NASA Astrophysics Data System (ADS)
Trafton, W. C.; Simpson, J.
2002-01-01
From a commercial perspective, the ability to justify "leap frog" technology such as reusable systems has been difficult to justify because the estimated 5B to 10B investment is not supported in the current flat commercial market coupled with an oversupply of launch service suppliers. The market simply does not justify investment of that magnitude. Currently, next generation Expendable Launch Systems, including Boeing's Delta IV, Lockheed Martin's Atlas 5, Ariane V ESCA and RSC's H-IIA are being introduced into operations signifying that only upgrades to proven systems are planned to meet the changes in anticipated satellite demand (larger satellites, more lifetime, larger volumes, etc.) in the foreseeable future. We do not see a new fleet of ELVs emerging beyond that which is currently being introduced, only continuous upgrades of the fleet to meet the demands. To induce a radical change in the provision of launch services, a Multinational Government investment must be made and justified by World requirements. The commercial market alone cannot justify such an investment. And if an investment is made, we cannot afford to repeat previous mistakes by relying on one system such as shuttle for commercial deployment without having any back-up capability. Other issues that need to be considered are national science and security requirements, which to a large extent fuels the Japanese, Chinese, Indian, Former Soviet Union, European and United States space transportation entries. Additionally, this system must support or replace current Space Transportation Economies with across-the-board benefits. For the next 10 to 20 years, Multinational cooperation will be in the form of piecing together launch components and infrastructure to supplement existing launch systems and reducing the amount of non-recurring investment while meeting the future requirements of the End-User. Virtually all of the current systems have some form of multinational participation: Sea Launch - Ukranian, Russian, American and Norwegian; Delta - U.S., Swedish and Japanese; Arianespace - European; RSC H2A - Japanese and U.S. This approach will continue because of the cost of new engine development, to name one, versus acquiring other new technology will continue to be evaluated from a business perspective. The commercial market will remain flat for the near and mid term unless broadband or some other "killer application" emerges. A fragmented multiple player launch services market will service customers for the near term. Some degree of consolidation or elimination of existing launch services alternatives is expected. We are already seeing some consolidation - Boeing Launch Services (BLS) marketing Sea Launch and Delta; International Launch Services (ILS) marketing Atlas and Proton; Arianespace/Starsem marketing Ariane and Soyuz. So what will be the key for Space Transportation Success in the future? Focusing on the "Whole Product Offering," providing a product that provides not only the generic and expected services, but also augmented services that provide differentiation and raises the value. At the Boeing Company, we are continually evaluating the augmented product, focusing on high problem solving value to provide a substantial, not incremental value of improvement. Our focus is on not just our customer, but also our customer's customer. And our focus is on how we can effect a positive change in their current business plan. We evaluate the areas of space segment risk, price and finance, and performance. Through these three areas, we are continuing to improve our product and become more integrated with the Customer and participants in ensuring the successful implementation of their business plans. Our augmented offerings include - Risk Management - Financial Performance - Performance Assurance We continue to build upon and extend these features to move beyond an augmented product and to prepare ourselves to offer "Potential Products" to recognize changes in the Customer's cost structure, customers, and environment. Linking ourselves around the world with subsystems suppliers and team members is a major part of our ability to maintain competitiveness and a prepared state to continue to differentiate us from our competitors through enhanced and unique services.
NASA Technical Reports Server (NTRS)
Crane, J. M.; Boucek, G. P., Jr.; Smith, W. D.
1986-01-01
A flight management computer (FMC) control display unit (CDU) test was conducted to compare two types of input devices: a fixed legend (dedicated) keyboard and a programmable legend (multifunction) keyboard. The task used for comparison was operation of the flight management computer for the Boeing 737-300. The same tasks were performed by twelve pilots on the FMC control display unit configured with a programmable legend keyboard and with the currently used B737-300 dedicated keyboard. Flight simulator work activity levels and input task complexity were varied during each pilot session. Half of the points tested were previously familiar with the B737-300 dedicated keyboard CDU and half had no prior experience with it. The data collected included simulator flight parameters, keystroke time and sequences, and pilot questionnaire responses. A timeline analysis was also used for evaluation of the two keyboard concepts.
The design and implementation of CRT displays in the TCV real-time simulation
NASA Technical Reports Server (NTRS)
Leavitt, J. B.; Tariq, S. I.; Steinmetz, G. G.
1975-01-01
The design and application of computer graphics to the Terminal Configured Vehicle (TCV) program were described. A Boeing 737-100 series aircraft was modified with a second flight deck and several computers installed in the passenger cabin. One of the elements in support of the TCV program is a sophisticated simulation system developed to duplicate the operation of the aft flight deck. This facility consists of an aft flight deck simulator, equipped with realistic flight instrumentation, a CDC 6600 computer, and an Adage graphics terminal; this terminal presents to the simulator pilot displays similar to those used on the aircraft with equivalent man-machine interactions. These two displays form the primary flight instrumentation for the pilot and are dynamic images depicting critical flight information. The graphics terminal is a high speed interactive refresh-type graphics system. To support the cockpit display, two remote CRT's were wired in parallel with two of the Adage scopes.
Far-Field Turbulent Vortex-Wake/Exhaust Plume Interaction for Subsonic and HSCT Airplanes
NASA Technical Reports Server (NTRS)
Kandil, Osama A.; Adam, Ihab; Wong, Tin-Chee
1996-01-01
Computational study of the far-field turbulent vortex-wake/exhaust plume interaction for subsonic and high speed civil transport (HSCT) airplanes is carried out. The Reynolds-averaged Navier-Stokes (NS) equations are solved using the implicit, upwind, Roe-flux-differencing, finite-volume scheme. The two-equation shear stress transport model of Menter is implemented with the NS solver for turbulent-flow calculation. For the far-field study, the computations of vortex-wake interaction with the exhaust plume of a single engine of a Boeing 727 wing in a holding condition and two engines of an HSCT in a cruise condition are carried out using overlapping zonal method for several miles downstream. These results are obtained using the computer code FTNS3D. The results of the subsonic flow of this code are compared with those of a parabolized NS solver known as the UNIWAKE code.
Water Injection Feasibility for Boeing 747 Aircraft
NASA Technical Reports Server (NTRS)
Daggett, David L.
2005-01-01
Can water injection be offered at a reasonable cost to large airplane operators to reduce takeoff NO( sub x) emissions? This study suggests it may be possible. This report is a contract deliverable to NASA Glenn Research Center from the prime contractor, The Boeing Commercial Airplane Company of Seattle, WA. This study was supported by a separate contract to the Pratt & Whitney Engine Company of Hartford, CT (contract number NNC04QB58P). Aviation continues to grow and with it, environmental pressures are increasing for airports that service commercial airplanes. The feasibility and performance of an emissions-reducing technology, water injection, was studied for a large commercial airplane (e.g., Boeing 747 with PW4062 engine). The primary use of the water-injection system would be to lower NOx emissions while an important secondary benefit might be to improve engine turbine life. A tradeoff exists between engine fuel efficiency and NOx emissions. As engines improve fuel efficiency, by increasing the overall pressure ratio of the engine s compressor, the resulting increased gas temperature usually results in higher NOx emissions. Low-NO(sub x) combustors have been developed for new airplanes to control the increases in NO(sub x) emissions associated with higher efficiency, higher pressure ratio engines. However, achieving a significant reduction of NO(sub x) emissions at airports has been challenging. Using water injection during takeoff has the potential to cut engine NO(sub x) emissions some 80 percent. This may eliminate operating limitations for airplanes flying into airports with emission constraints. This study suggests an important finding of being able to offer large commercial airplane owners an emission-reduction technology that may also save on operating costs.
Community noise technology needs: Boeing's perspective
NASA Technical Reports Server (NTRS)
Nihart, Gene L.
1992-01-01
Airport community acceptance of High Speed Civil Transport (HSCT) noise levels will depend on the relative noise levels of airplanes flying at the time of introduction. The 85 dBA noise contours for the range of large subsonic airplanes that are expected to be in service in the early 21st century are shown as a shaded area. A certifiable HSCT noise contour as shown, would be somewhat wider along the runway, but about the same in the residential areas downrange. An HSCT noise rule should insure this noise capability.
2007-04-26
KENNEDY SPACE CENTER, FLA. -- Noted physicist Stephen Hawking (center) returns to the Kennedy Space Center Shuttle Landing Facility after a zero gravity flight. At far left is Peter Diamandis, founder of the Zero Gravity Corp. that provided the flight aboard its modified Boeing 727. Hawking suffers from amyotrophic lateral sclerosis (also known as Lou Gehrig's disease). At the celebration of his 65th birthday on January 8 this year, Hawking announced his plans for a zero-gravity flight to prepare for a sub-orbital space flight in 2009 on Virgin Galactic's space service. Photo credit: NASA/Kim Shiflett
1998-12-02
In the Payload Hazardous Servicing Facility, workers adjust a science panel they are installing on the spacecraft Stardust. Scheduled to be launched aboard a Boeing Delta 7426 rocket from Complex 17, Cape Canaveral Air Station, on Feb. 6, 1999, Stardust will use a unique medium called aerogel to capture comet particles flying off the nucleus of comet Wild 2 in January 2004, plus collect interstellar dust for later analysis. The collected samples will return to Earth in a re-entry capsule to be jettisoned as it swings by Earth in January 2006
1998-12-04
In the Payload Hazardous Servicing Facility, the Stardust spacecraft is ready for the sample return capsule to be attached. Stardust will use a unique medium called aerogel to capture comet particles flying off the nucleus of comet Wild 2 in January 2004, plus collect interstellar dust for later analysis. The collected samples will return to Earth in the re-entry capsule to be jettisoned as it swings by Earth in January 2006. Stardust is scheduled to be launched aboard a Boeing Delta 7426 rocket from Complex 17, Cape Canaveral Air Station, on Feb. 6, 1999
1998-12-02
In the Payload Hazardous Servicing Facility, workers get ready to install a science panel on the spacecraft Stardust. Scheduled to be launched aboard a Boeing Delta 7426 rocket from Complex 17, Cape Canaveral Air Station, on Feb. 6, 1999, Stardust will use a unique medium called aerogel to capture comet particles flying off the nucleus of comet Wild 2 in January 2004, plus collect interstellar dust for later analysis. The collected samples will return to Earth in a re-entry capsule to be jettisoned as it swings by Earth in January 2006
1998-11-16
In the Payload Hazardous Servicing Facility, workers begin removing the Stardust solar panels for testing. The spacecraft Stardust will use a unique medium called aerogel to capture comet particles flying off the nucleus of comet Wild 2 in January 2004, plus collect interstellar dust for later analysis. Stardust will be launched aboard a Boeing Delta 7426 rocket from Complex 17, Cape Canaveral Air Station, targeted for Feb. 6, 1999. The collected samples will return to Earth in a re-entry capsule to be jettisoned from Stardust as it swings by Earth in January 2006
Ribbon cutting opens new ELV offices
NASA Technical Reports Server (NTRS)
2000-01-01
The audience applauds and enjoys the official opening of the E&O Building as the new site of the Expendable Launch Vehicle Program. Home for NASA's unmanned missions since 1964, the building has been renovated to house the ELV Program. Cutting the ribbon for the event were Deputy Manager of the ELV and Payload Carrier Programs, Steve Francois; Director of ELV Launch Services, Michael Benik; Center Director Roy Bridges; Manager of the ELV and Payload Carrier Programs, Bobby Bruckner; and Senior Manager of the Boeing ELV Program Support office, Jim Schofield.
2013-01-11
TITUSVILLE, Fla. - In the Astrotech payload processing facility in Titusville, Fla. near NASA’s Kennedy Space Center, a Boeing technician checks out the Tracking and Data Relay Satellite, TDRS-K. Launch of the TDRS-K on the Atlas V rocket is planned for January 29, 2013. The TDRS-K spacecraft is part of the next-generation series in the Tracking and Data Relay Satellite System, a constellation of space-based communication satellites providing tracking, telemetry, command and high-bandwidth data return services. For more information, visit http://www.nasa.gov/mission_pages/tdrs/index.html Photo credit: NASA/Jim Grossmann
2006-06-02
KENNEDY SPACE CENTER, FLA. - Workers supervise the lift of the first stage of the Boeing Delta II rocket, slated to launch NASA's Solar Terrestrial Relations Observatory (STEREO), into the mobile service tower at Pad 17B on Cape Canaveral Air Force Station. Preparations are under way for a liftoff no earlier than July 22. STEREO consists of two spacecraft whose mission is the first to take measurements of the sun and solar wind in 3-D. This new view will improve our understanding of space weather and its impact on the Earth. Photo credit: NASA/Jim Grossmann
2000-11-08
The audience applauds and enjoys the official opening of the E&O Building as the new site of the Expendable Launch Vehicle Program. Home for NASA’s unmanned missions since 1964, the building has been renovated to house the ELV Program.; Cutting the ribbon for the event were Deputy Manager of the ELV and Payload Carrier Programs, Steve Francois; Director of ELV Launch Services, Michael Benik; Center Director Roy Bridges; Manager of the ELV and Payload Carrier Programs, Bobby Bruckner; and Senior Manager of the Boeing ELV Program Support office, Jim Schofield
Boeing CST-100 Starliner Base Heat Shield Installation
2018-03-15
On March 15, the base heat shield for Boeing’s CST-100 Starliner was freshly installed on the bottom of Spacecraft 1 in the High Bay of the Commercial Crew and Cargo Processing Facility at Kennedy Space Center. This is the spacecraft that will fly during the Pad Abort Test. The next step involves installation of the back shells and forward heat shield, and then the crew module will be mated to the service module for a fit check. Finally, the vehicle will head out to White Sands Missile Range in New Mexico for testing.
2004-07-06
KENNEDY SPACE CENTER, FLA. - Workers in the mobile service tower on Pad 17-B, Cape Canaveral Air Force Station, check the progress of the Boeing Delta II Heavy second-stage engine as it descends toward the first stage. The Delta is the launch vehicle for the MESSENGER (Mercury Surface, Space Environment, Geochemistry and Ranging) spacecraft, scheduled to lift off Aug. 2. Bound for Mercury, the spacecraft is expected to reach orbit around the planet in March 2011. MESSENGER was built for NASA by the Johns Hopkins University Applied Physics Laboratory in Laurel, Md.
2004-07-06
KENNEDY SPACE CENTER, FLA. - The Boeing Delta II Heavy second-stage engine, the Aerojet AJ10-118K, is ready for lifting up the mobile service tower at Pad 17-B, Cape Canaveral Air Force Station. The Delta II is the launch vehicle for the MESSENGER (Mercury Surface, Space Environment, Geochemistry and Ranging) spacecraft, scheduled to lift off Aug. 2. Bound for Mercury, the spacecraft is expected to reach orbit around the planet in March 2011. MESSENGER was built for NASA by the Johns Hopkins University Applied Physics Laboratory in Laurel, Md.
2006-07-13
KENNEDY SPACE CENTER, FLA. - Inside the mobile service tower on Launch Pad 17-B on Cape Canaveral Air Force Station, workers help guide the Boeing Delta II second stage for the STEREO launch onto the first stage for mating. STEREO stands for Solar Terrestrial Relations Observatory and comprises two spacecraft. The STEREO mission is the first to take measurements of the sun and solar wind in 3-dimension. This new view will improve our understanding of space weather and its impact on the Earth. STEREO is expected to lift off in August 2006. Photo credit: NASA/George Shelton
International Space Station ECLSS Technical Task Agreement Summary Report
NASA Technical Reports Server (NTRS)
Ray, C. D. (Compiler); Salyer, B. H. (Compiler)
1999-01-01
This Technical Memorandum provides a summary of current work accomplished under Technical Task Agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the International Space Station (ISS) Environmental Control and Life Support System (ECLSS). Current activities include ECLSS component design and development, computer model development, subsystem/integrated system testing, life testing, and general test support provided to the ISS program. Under ECLSS design, MSFC was responsible for the six major ECLSS functions, specifications and standard, component design and development, and was the architectural control agent for the ISS ECLSS. MSFC was responsible for ECLSS analytical model development. In-house subsystem and system level analysis and testing were conducted in support of the design process, including testing air revitalization, water reclamation and management hardware, and certain nonregenerative systems. The activities described herein were approved in task agreements between MSFC and NASA Headquarters Space Station Program Management Office and their prime contractor for the ISS, Boeing. These MSFC activities are in line to the designing, development, testing, and flight of ECLSS equipment planned by Boeing. MSFC's unique capabilities for performing integrated systems testing and analyses, and its ability to perform some tasks cheaper and faster to support ISS program needs, are the basis for the TTA activities.
Concept of Operations Visualization for Ares I Production
NASA Technical Reports Server (NTRS)
Chilton, Jim; Smith, David Alan
2008-01-01
Establishing Computer Aided Design models of the Ares I production facility, tooling and vehicle components and integrating them into manufacturing visualizations/simulations allows Boeing and NASA to collaborate real time early in the design/development cycle. This collaboration identifies cost effective and lean solutions that can be easily shared with Ares stakeholders (e.g., other NASA Centers and potential science users). These Ares I production visualizations and analyses by their nature serve as early manufacturing improvement precursors for other Constellation elements to be built at the Michoud Assembly Facility such as Ares V and the Altair Lander. Key to this Boeing and Marshall Space Flight Center collaboration has been the use of advanced virtual manufacturing tools to understand the existing Shuttle era infrastructure and trade potential modifications to support Ares I production. These approaches are then used to determine an optimal manufacturing configuration in terms of labor efficiency, safety and facility enhancements. These same models and tools can be used in an interactive simulation of Ares I and V flight to the Space Station or moon to educate the human space constituency (e.g., government, academia, media and the public) in order to increase national and international understanding of Constellation goals and benefits.
Hybrid-Wing-Body Vehicle Composite Fuselage Analysis and Case Study
NASA Technical Reports Server (NTRS)
Mukhopadhyay, Vivek
2014-01-01
Recent progress in the structural analysis of a Hybrid Wing-Body (HWB) fuselage concept is presented with the objective of structural weight reduction under a set of critical design loads. This pressurized efficient HWB fuselage design is presently being investigated by the NASA Environmentally Responsible Aviation (ERA) project in collaboration with the Boeing Company, Huntington Beach. The Pultruded Rod-Stiffened Efficient Unitized Structure (PRSEUS) composite concept, developed at the Boeing Company, is approximately modeled for an analytical study and finite element analysis. Stiffened plate linear theories are employed for a parametric case study. Maximum deflection and stress levels are obtained with appropriate assumptions for a set of feasible stiffened panel configurations. An analytical parametric case study is presented to examine the effects of discrete stiffener spacing and skin thickness on structural weight, deflection and stress. A finite-element model (FEM) of an integrated fuselage section with bulkhead is developed for an independent assessment. Stress analysis and scenario based case studies are conducted for design improvement. The FEM model specific weight of the improved fuselage concept is computed and compared to previous studies, in order to assess the relative weight/strength advantages of this advanced composite airframe technology
78 FR 61164 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-03
... have been found in inner cylinder pivot bores due to friction-generated heat damage. More frequent lubrication reduces friction in the joint. Also, the Boeing 767-200/-300/-300F maintenance planning document...
78 FR 22182 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-15
... flight cycles after the effective date of this AD, whichever occurs later. STC Winglet Comment Aviation Partners Boeing stated that the installation of winglets per STC ST00830SE ( http://rgl.faa.gov/Regulatory...
77 FR 31762 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-30
..., Steel Part Surface Inspection (Impedance Plane Display), of Part 6, Eddy Current, of the Boeing 707, 720... Subject 51-00-00 Figure 24, Steel Part Surface Inspection (Impedance Plane Display), of Part 6, Eddy...
Boeing flight deck design philosophy
NASA Technical Reports Server (NTRS)
Stoll, Harty
1990-01-01
Information relative to Boeing flight deck design philosophy is given in viewgraph form. Flight deck design rules, design considerations, functions allocated to the crew, redundancy and automation concerns, and examples of accident data that were reviewed are listed.
An Integrated Toolset for Agile Systems Engineering Requirements Analysis
2011-05-19
Tool STDUse Cases Collaboration Tool Data Mgmt T l 1 e a a managemen oo Run the test in the test lab, redline the STD Update the collaboration...Boeing Defense, Space & Security Lean-Agile Software A I t t d T l t fn n egra e oo se or Agile Systems Engineering Requirements Analysis Phyllis...Regulations (ITAR) and the Export Administration R l ti (EAR) h i l bl b t h th i th BOEING is a trademark of Boeing Management Company. Copyright © 2010
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. At Astrotech in Titusville, Fla., Boeing technicians hold guide wires attached to the crane lifting the GOES-N satellite. Since its arrival on March 11, the satellite has been undergoing final testing by Boeing Satellite Systems of the imaging system, instrumentation, communications and power systems. Geostationary Operational Environmental Satellites (GOES) are sponsored by NASAs Goddard Space Flight Center and the National Oceanic and Atmospheric Administration. GOES-N is targeted to launch May 4 onboard a Boeing expendable launch vehicle Delta IV (4,2) with a 3-burn second stage operation.
Fuselage disbond inspection procedure using pulsed thermography
NASA Astrophysics Data System (ADS)
Ashbaugh, Mike; Thompson, Jeffrey G.
2002-05-01
One use of pulsed thermography that has shown promise in aircraft inspection for some time is an inspection for disbonds in metallic structures. The FAA has funded research at Wayne State University in this area and Boeing identified a specific inspection requirement for disbonds on Boeing 747 aircraft. Laboratory and subsequent field testing monitored by the AANC has demonstrated the reliability of this type of inspection. As a result Boeing expects to approve a general fuselage disbond inspection procedure using pulsed thermography in the 2nd Quarter of 2001.
Application of Gr/PMR-15 to commercial aircraft
NASA Technical Reports Server (NTRS)
Postlewaite, J.; Porter, K.; Mclaren, D.
1985-01-01
Following from early experience with polyimides on the SST program and Shuttle aft flap studies the Boeing Company is now working on collaborative programs with its principal nacelle suppliers to pursue the development of Gr/PMR-15 nacelle components. Two programs are currently in effect. The first program is directed specifically towards the flight test and service evaluation at the earliest possible date of a 747 nacelle core cowl structure. The second program seeks to firmly establish the producibility and cost of a 757 thrust reverser C duct in a production environment. The near term objectives of these programs include: (1) the comparison of estimated cost and weight of Gr/PMR-15 versus metal structure, (2) the engine test of representative composite structure, (3) the preliminary design and analysis of the C duct structure, and (4) the preparation of cost data and time schedules for the development and producibility program. In addition to powerplant structure, the propulsion ducting system has shown to be a strong candidate for Gr/PMR-15 application. Currently, the Boeing 747 Organization is evaluating the use of PMR-15 matrix composites to replace nearly 800 lbs of titanium ducting per airplane.
1997-08-25
A Boeing Delta II expendable launch vehicle lifts off with NASA’s Advanced Composition Explorer (ACE) observatory at 10:39 a.m. EDT, on Aug. 25, 1997, from Launch Complex 17A, Cape Canaveral Air Station. This is the second Delta launch under the Boeing name and the first from Cape Canaveral. Launch was scrubbed one day by Air Force range safety personnel because two commercial fishing vessels were within the Delta’s launch danger area. The ACE spacecraft will study low-energy particles of solar origin and high-energy galactic particles on its one-million-mile journey. The collecting power of instruments aboard ACE is 10 to 1,000 times greater than anything previously flown to collect similar data by NASA. Study of these energetic particles may contribute to our understanding of the formation and evolution of the solar system. ACE has a two-year minimum mission lifetime and a goal of five years of service. ACE was built for NASA by the Johns Hopkins Applied Physics Laboratory and is managed by the Explorer Project Office at NASA's Goddard Space Flight Center. The lead scientific institution is the California Institute of Technology (Caltech) in Pasadena, Calif
1997-08-25
Photographers and other onlookers watch as a Boeing Delta II expendable launch vehicle lifts off with NASA’s Advanced Composition Explorer (ACE) observatory at 10:39 a.m. EDT, on Aug. 25, 1997, from Launch Complex 17A, Cape Canaveral Air Station. This is the second Delta launch under the Boeing name and the first from Cape Canaveral. Liftoff had been scheduled for Aug. 24, but was scrubbed one day by Air Force range safety personnel because two commercial fishing vessels were within the Delta’s launch danger area. The ACE spacecraft will study low-energy particles of solar origin and high-energy galactic particles on its one-million-mile journey. The collecting power of instruments aboard ACE is 10 to 1,000 times greater than anything previously flown to collect similar data by NASA. Study of these energetic particles may contribute to our understanding of the formation and evolution of the solar system. ACE has a two-year minimum mission lifetime and a goal of five years of service. ACE was built for NASA by the Johns Hopkins Applied Physics Laboratory and is managed by the Explorer Project Office at NASA's Goddard Space Flight Center. The lead scientific institution is the California Institute of Technology (Caltech) in Pasadena, Calif
1997-08-25
A Boeing Delta II expendable launch vehicle lifts off with NASA’s Advanced Composition Explorer (ACE) observatory at 10:39 a.m. EDT, on Aug. 25, 1997, from Launch Complex 17A, Cape Canaveral Air Station. This is the second Delta launch under the Boeing name and the first from Cape Canaveral. Launch was scrubbed one day by Air Force range safety personnel because two commercial fishing vessels were within the Delta’s launch danger area. The ACE spacecraft will study low-energy particles of solar origin and high-energy galactic particles on its one-million-mile journey. The collecting power of instruments aboard ACE is 10 to 1,000 times greater than anything previously flown to collect similar data by NASA. Study of these energetic particles may contribute to our understanding of the formation and evolution of the solar system. ACE has a two-year minimum mission lifetime and a goal of five years of service. ACE was built for NASA by the Johns Hopkins Applied Physics Laboratory and is managed by the Explorer Project Office at NASA's Goddard Space Flight Center. The lead scientific institution is the California Institute of Technology (Caltech) in Pasadena, Calif
1997-08-25
A Boeing Delta II expendable launch vehicle lifts off with NASA’s Advanced Composition Explorer (ACE) observatory at 10:39 a.m. EDT, on Aug. 25, 1997, from Launch Complex 17A, Cape Canaveral Air Station. This is the second Delta launch under the Boeing name and the first from Cape Canaveral. Launch was scrubbed one day by Air Force range safety personnel because two commercial fishing vessels were within the Delta’s launch danger area. The ACE spacecraft will study low-energy particles of solar origin and high-energy galactic particles on its one-million-mile journey. The collecting power of instruments aboard ACE is 10 to 1,000 times greater than anything previously flown to collect similar data by NASA. Study of these energetic particles may contribute to our understanding of the formation and evolution of the solar system. ACE has a two-year minimum mission lifetime and a goal of five years of service. ACE was built for NASA by the Johns Hopkins Applied Physics Laboratory and is managed by the Explorer Project Office at NASA's Goddard Space Flight Center. The lead scientific institution is the California Institute of Technology (Caltech) in Pasadena, Calif
The Advanced Composition Explorer spacecraft lifts off from Pad 17A, CCAS
NASA Technical Reports Server (NTRS)
1997-01-01
A Boeing Delta II expendable launch vehicle lifts off with NASA's Advanced Composition Explorer (ACE) observatory at 10:39 a.m. EDT, on Aug. 25, 1997, from Launch Complex 17A, Cape Canaveral Air Station. This is the second Delta launch under the Boeing name and the first from Cape Canaveral. Launch was scrubbed one day by Air Force range safety personnel because two commercial fishing vessels were within the Delta's launch danger area. The ACE spacecraft will study low-energy particles of solar origin and high-energy galactic particles on its one-million-mile journey. The collecting power of instruments aboard ACE is 10 to 1,000 times greater than anything previously flown to collect similar data by NASA. Study of these energetic particles may contribute to our understanding of the formation and evolution of the solar system. ACE has a two-year minimum mission lifetime and a goal of five years of service. ACE was built for NASA by the Johns Hopkins Applied Physics Laboratory and is managed by the Explorer Project Office at NASA's Goddard Space Flight Center. The lead scientific institution is the California Institute of Technology (Caltech) in Pasadena, Calif.
78 FR 49217 - Airworthiness Directives; the Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-13
... Airworthiness Limitations Boeing requested that we add ALI Task 28-AWL-18, ``Fuel Quantity Indicating System... Control Limitation (CDCCL) Task 28-AWL-19, ``Fuel Quantity Indicating System (FQIS)--Out- Tank Wiring... of the airplane. [[Page 49220
2014-06-09
CAPE CANAVERAL, Fla. – John Elbon, The Boeing Company's vice president general manager of Boeing Space Systems, discusses the CST-100 spacecraft during a ceremony inside Orbiter Processing Facility 3 at NASA's Kennedy Space Center in Florida. Photo credit: NASA/Kim Shiflett
Shearographic Inspection of a Boeing 737
DOT National Transportation Integrated Search
1992-07-01
Under a Cooperative Research and Development Agreement between VNTSC and Henson Aviation, Inc., operator of USAir Express, a shearographic demonstration inspection of the fuselage of a Boeing 737 aircraft was performed at a USAir repair station at Wi...
Boeing Displays Process Action team
NASA Astrophysics Data System (ADS)
Wright, R. Nick; Jacobsen, Alan R.
2000-08-01
Boeing uses Active Matrix Liquid Crystal Display (AMLCD) technology in a wide variety of its aerospace products, including military, commercial, and space applications. With the demise of Optical Imaging Systems (OIS) in September 1998, the source of on-shore custom AMLCD products has become very tenuous. Reliance on off-shore sources of AMLCD glass for aerospace products is also difficult when the average life of a display product is often less than one-tenth the 30 or more years expected from aerospace platforms. Boeing is addressing this problem through the development of a Displays Process Action Team that gathers input from all display users across the spectrum of our aircraft products. By consolidating requirements, developing common interface standards, working with our suppliers and constantly monitoring custom sources as well as commercially available products, Boeing is minimizing the impact (current and future) of the uncertain AMLCD avionics supply picture.
Boeing Unveils New Suit for Commercial Crew Astronauts
2017-01-23
Boeing unveiled its spacesuit design Wednesday as the company continues to move toward flight tests and crew rotation missions of its Starliner spacecraft and launch systems that will fly astronauts to the International Space Station. Astronauts heading into orbit for the station aboard the Starliner will wear Boeing’s new spacesuits. The suits are custom-designed to fit each astronaut, lighter and more comfortable than earlier versions and meet NASA requirements for safety and functionality. NASA's commercial crew astronauts Eric Boe and Suni Williams tried on the suits at Boeing’s Commercial Crew and Cargo Facility at NASA’s Kennedy Space Center. Boe, Williams, Bob Behnken, and Doug Hurley were selected by NASA in July 2015 to train for commercial crew test flights aboard the Starliner and SpaceX’s Crew Dragon spacecraft. The flight assignments have not been set, so all four of the astronauts are rehearsingheavily for flights aboard both vehicles.
SEL and EPNL noise duration coefficients for the 747 and T-38 aircraft
NASA Technical Reports Server (NTRS)
Willshire, W. L., Jr.
1981-01-01
Duration coefficient were calculated for Boeing 747 and T-38 airplanes for sound exposure level (SEL) and effective perceived noise level (EPNL) scales. The measured SEL suration coefficients were 8.4 for the Boeing 747 and 5.5 for the T-38 result was in good agreement with a previous result for a similar F-5 airplane. In EPNL, the duration coefficients were 7.2 for the Boeing 747 and 5.7 for the T-38. The difference in the results between the two airplanes is believed to be due to their different engine noise source spectra. The difference in the Boeing 747 results in the two different metric was due to the different frequency weighting of A-weighted sound pressure level, used in SEL, and tone-corrected perceived noise level, used in EPNL, when applied to the 747 spectra.
Performance retention of the RB211 powerplant in service
NASA Technical Reports Server (NTRS)
Astridge, B. L.; Pinder, J. T.
1981-01-01
An understanding of the mechanisms of deterioration is essential in order that features to counteract performance degradation can be built into the basic design of an engine and nacelle. Furthermore, the interpretation must be continued in service for effective feedback to provide modifications which may be necessary in maintaining a satisfactory performance retention program. The in service assessment must be accurate as to magnitude and causes and this requires consideration of: (1) the powerplant as a complete entity, i.e., the engine components and nacelle including the thrust reverser; (2) measurement of performance in flight rather than by sole reliance on the scaling of test cell data to flight conditions (although some correlation should be possible); and (3) the relationship of engine parts condition to overhaul performance and in flight deterioration level of that engine. These aspects are addressed by consideration of the RB211 engine in service in both the Lockheed L1011 Tristar and Boeing 747 aircraft.
Xiong, X R; Li, J; Fu, M; Gao, C; Wang, Y; Zhong, J C
2013-02-01
The objective was to investigate the effects of bovine oocyte extract (BOE) on epigenetic reprogramming of yak fibroblast cells, based on their cell cycle status, histone acetylation, DNA methylation, gene expression, and cloned blastocyst formation. Permeabilization of yak fibroblasts after treatment with 10 or 50 μL of BOE (treated-S and treated-L groups, respectively) for 24 hours increased (P < 0.05) the cell population at the G(0)/G(1) phase (85.2 ± 2.3% and 89.6 ± 1.5%, respectively) compared with controls (75.4 ± 1.1%). Acetylation at lysine 9 of histone H3 was also higher (26.1 ± 1.4 and 33.5 ± 2.1) than in the control group (15.3 ± 1.6; P < 0.05). Moreover, BOE reduced methylation of the promoter regions of Oct-4 and Nanog (76.4% and 72.2%; and 35.6% and 30.0%, respectively) compared with the control group (92.1% and 47.8%; P < 0.05). In addition, the relative expression levels of HDAC-1, HADC-2, Dnmt-1, and Dnmt-3a were downregulated (P < 0.05) after yak fibroblasts were treated with BOE. Furthermore, when yak fibroblasts were used for interspecies somatic cell nuclear transfer after BOE treatment, 8-cell and blastocyst formation rates significantly exceeded those of the control. In conclusion, BOE induced epigenetic reprogramming of yak fibroblasts, making them suitable donors for yak interspecies somatic cell nuclear transfer. Crown Copyright © 2013. Published by Elsevier Inc. All rights reserved.
78 FR 28729 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-16
... Boeing Company Model 757-200 and -200PF series airplanes. That AD currently requires modifying the... specifies a maximum compliance time limit that overrides the optional threshold formula results. This AD was... analytical loads that [[Page 28730
Airport Pavement Design For The Boeing 777 Airplane
DOT National Transportation Integrated Search
1995-10-22
The purpose of this advisory circular is to provide thickness design standards : for pavements intended to serve the Boeing 777 airplane. A new method of design : based on layered elastic analysis has been developed to calculate design : thickness fo...
Diffraction and pulse slippage in the Boeing 1 kW FEL oscillator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blau, J.; Wong, R.K.; Colson, W.B.
1995-12-31
A four-dimensional simulation in x, y, z, and t, including betatron motion of the electrons, is used to study the combined effects of diffraction, pulse slippage and desynchronism in the Boeing 1 kW FEL oscillator.
NASA Technical Reports Server (NTRS)
Aniversario, R. B.; Harvey, S. T.; Mccarty, J. E.; Parson, J. T.; Peterson, D. C.; Pritchett, L. D.; Wilson, D. R.; Wogulis, E. R.
1982-01-01
The development, testing, production activities, and associated costs that were required to produce five-and-one-half advanced-composite stabilizer shipsets for Boeing 737 aircraft are defined and discussed.
NASA Technical Reports Server (NTRS)
Mchugh, F. J.; Eason, W.; Alexander, H. R.; Mutter, H.
1973-01-01
Wind tunnel test data obtained from a 1/4.622 Froude scale Boeing Model 222 with a full span, two prop, tilt rotor, powered model in the Boeing V/STOL wind tunnel are reported. Data were taken in transition and cruise flight conditions and include performance, stability and control and blade loads information. The effects of the rotors, tail surfaces and airframe on the performance and stability are isolated as are the effects of the airframe on the rotors.
Subsonic Ultra Green Aircraft Research Phase II: N+4 Advanced Concept Development
NASA Technical Reports Server (NTRS)
Bradley, Marty K.; Droney, Christopher K.
2012-01-01
This final report documents the work of the Boeing Subsonic Ultra Green Aircraft Research (SUGAR) team on Task 1 of the Phase II effort. The team consisted of Boeing Research and Technology, Boeing Commercial Airplanes, General Electric, and Georgia Tech. Using a quantitative workshop process, the following technologies, appropriate to aircraft operational in the N+4 2040 timeframe, were identified: Liquefied Natural Gas (LNG), Hydrogen, fuel cell hybrids, battery electric hybrids, Low Energy Nuclear (LENR), boundary layer ingestion propulsion (BLI), unducted fans and advanced propellers, and combinations. Technology development plans were developed.
Space transfer services as a precursor to space business parks
NASA Astrophysics Data System (ADS)
Smitherman, David V.
1998-01-01
Boeing Defense and Space Group and NASA, Marshall Space Flight Center conducted a study in 1996-1997 on the topic of commercial space business parks under the sponsorship of the former Office of Advanced Concepts at NASA Headquarters (Marshall 1997). The findings of this 7-month study are used to present possible strategies for near-term commercial developments in space. Related data from NASA studies on public space travel, and commercial space transportation are included along with the author's observations. It is hoped that this analysis will assist future entrepreneurs in the development of commercial space business parks. In conclusion, it appears that a market could soon become viable for commercial space transfer services, and that this market could form the infrastructure to grow the first commercial space business park.
NASA Environmentally Responsible Aviation Hybrid Wing Body Flow-Through Nacelle Wind Tunnel CFD
NASA Technical Reports Server (NTRS)
Schuh, Michael J.; Garcia, Jospeh A.; Carter, Melissa B.; Deere, Karen A.; Stremel, Paul M.; Tompkins, Daniel M.
2016-01-01
Wind tunnel tests of a 5.75% scale model of the Boeing Hybrid Wing Body (HWB) configuration were conducted in the NASA Langley Research Center (LaRC) 14'x22' and NASA Ames Research Center (ARC) 40'x80' low speed wind tunnels as part of the NASA Environmentally Responsible Aviation (ERA) Project. Computational fluid dynamics (CFD) simulations of the flow-through nacelle (FTN) configuration of this model were performed before and after the testing. This paper presents a summary of the experimental and CFD results for the model in the cruise and landing configurations.
NASA Environmentally Responsible Aviation Hybrid Wing Body Flow-Through Nacelle Wind Tunnel CFD
NASA Technical Reports Server (NTRS)
Schuh, Michael J.; Garcia, Joseph A.; Carter, Melissa B.; Deere, Karen A.; Tompkins, Daniel M.; Stremel, Paul M.
2016-01-01
Wind tunnel tests of a 5.75 scale model of the Boeing Hybrid Wing Body (HWB) configuration were conducted in the NASA Langley Research Center (LaRC) 14x22 and NASA Ames Research Center (ARC) 40x80 low speed wind tunnels as part of the NASA Environmentally Responsible Aviation (ERA) Project. Computational fluid dynamics (CFD) simulations of the flow-through nacelle (FTN) configuration of this model were performed before and after the testing. This paper presents a summary of the experimental and CFD results for the model in the cruise and landing configurations.
The implementation and use of Ada on distributed systems with high reliability requirements
NASA Technical Reports Server (NTRS)
Knight, J. C.
1987-01-01
A preliminary analysis of the Ada implementation of the Advanced Transport Operating System (ATOPS), an experimental computer control system developed at NASA Langley for a modified Boeing 737 aircraft, is presented. The criteria that was determined for the evaluation of this approach is described. A preliminary version of the requirements for the ATOPS is contained. This requirements specification is not a formal document, but rather a description of certain aspects of the ATOPS system at a level of detail that best suits the needs of the research. The survey of backward error recovery techniques is also presented.
Advanced composite elevator for Boeing 727 aircraft
NASA Technical Reports Server (NTRS)
1978-01-01
Detail design activities are reported for a program to develop an advanced composites elevator for the Boeing 727 commercial transport. Design activities include discussion and results of the ancillary test programs, sustaining efforts, weight status, manufacturing producibility studies, quality assurance development, and production status.
NASA's modified Boeing 747 Shuttle Carrier Aircraft with the Space Shuttle Endeavour on top lifts of
NASA Technical Reports Server (NTRS)
2001-01-01
NASA's modified Boeing 747 Shuttle Carrier Aircraft with the Space Shuttle Endeavour on top lifts off from Edwards Air Force Base to begin its ferry flight back to the Kennedy Space Center in Florida.
Feasibility study of the Boeing Small Research Module (BSRM) concept
NASA Technical Reports Server (NTRS)
1975-01-01
The design, capabilities, and subsystem options are described for the Boeing Small Research Module (BSRM). Specific scientific missions are defined and the BSRM capability to support these missions is discussed. Launch vehicle integration requirements and spacecraft operational features are also presented.
78 FR 70211 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-25
.... ACTION: Final rule. SUMMARY: We are adopting a new airworthiness directive (AD) for all The Boeing... assemblies of the inboard track of the left and right inboard flaps for cracking, and corrective actions if... Operations, M-30, West Building [[Page 70212
2011-11-22
CAPE CANAVERAL, Fla. -- The pressurized vessel of The Boeing Co.'s Commercial Crew Transportation System, which could take NASA astronauts to the International Space Station, is on display in Orbiter Processing Facility-3 (OPF-3) at NASA's Kennedy Space Center in Florida. Boeing is maturing its CST-100 spacecraft design for NASA's Commercial Crew Program (CCP) under the Commercial Crew Development Round 2 (CCDev2) activities. Boeing's current design shows the CST-100 taking up to seven astronauts and cargo to the space station or other low Earth orbit destinations by the middle of the decade. Through an agreement with NASA and Space Florida, Boeing is leasing OPF-3, the Processing Control Facility (PCC) and Space Shuttle Main Engine Shop at Kennedy to design, manufacture, process and integrate the CST-100. This work is expected to generate up to 550 engineering and technical jobs for Florida's Space Coast. Chuck Hardison, Boeing's production and ground operations manager, explained that the CST-100 will be manufactured using a spin-form technology, which is expected to bring down the cost and safety concerns of a traditional welded spacecraft. It's innovations such as this that CCP hopes will drive down the cost of space travel as well as open up space to more people than ever before. Seven aerospace companies are maturing launch vehicle and spacecraft designs under CCDev2, including Alliant Techsystems Inc. (ATK) of Promontory, Utah, Blue Origin of Kent, Wash., The Boeing Co., of Houston, Excalibur Almaz Inc. of Houston, Sierra Nevada Corp. of Louisville, Colo., Space Exploration Technologies (SpaceX) of Hawthorne, Calif., and United Launch Alliance (ULA) of Centennial, Colo. For more information, visit www.nasa.gov/exploration/commercial Photo credit: Jim Grossmann
Boeing's CST-100 Structural Test Article Arrival - Boeing's Faci
2016-12-08
Boeing’s Structural Test Article of its CST-100 Starliner spacecraft arrives at the company’s Huntington Beach, California, facilities for evaluations. Built to the specifications of an operational spacecraft, the STA is intended to be evaluated through a series of thorough testing conditions.
Boe, Stott and Barratt on middeck
2011-03-03
S133-E-008336 (3 March 2011) --- NASA astronauts Eric Boe (left), STS-133 pilot; Nicole Stott and Michael Barratt, both mission specialists, work on the middeck of space shuttle Discovery while docked with the International Space Station. Photo credit: NASA or National Aeronautics and Space Administration
75 FR 3278 - Petition for Exemption; Summary of Petition Received
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-20
... Boeing 747-8/8F model airplane. [FR Doc. 2010-927 Filed 1-19-10; 8:45 am] BILLING CODE 4910-13-P .... Petitioner: The Boeing Company. Section of 14 CFR Affected: 14 CFR 25.981(a)(3). Description of Relief Sought...
1960-01-01
This photograph shows a Saturn V first stage (S-1C). This stage was assembled at the Manufacturing Engineering Laboratory at NASA's Marshall Space Flight Center. With assistance by the Boeing Company, the manufacturer, this first stage was assembled using components made by Boeing in Wichita, Kansas and New Orleans.
Eric Boe and Bob Behnken - Dragon Tour
2017-03-08
Astronaut Eric Boe examines hardware during a tour of the SpaceX facility in Hawthorne, California. SpaceX is developing its Crew Dragon spacecraft and Falcon 9 rocket in partnership with NASA’s Commercial Crew Program to carry astronauts to and from the International Space Station.
Eric Boe and Bob Behnken - Dragon Tour
2017-03-08
Astronauts Bob Behnken, left, and Eric Boe are outside the SpaceX facility in Hawthorne, California. SpaceX is developing its Crew Dragon spacecraft and Falcon 9 rocket in partnership with NASA’s Commercial Crew Program to carry astronauts to and from the International Space Station.
ASTAR Flight Test: Overview and Spacing Results
NASA Technical Reports Server (NTRS)
Roper, Roy D.; Koch, Michael R.
2016-01-01
The purpose of the NASA Langley Airborne Spacing for Terminal Arrival Routes (ASTAR) research aboard the Boeing ecoDemonstrator aircraft was to demonstrate the use of NASA's ASTAR algorithm using contemporary tools of the Federal Aviation Administration's Next Generation Air Transportation System (NEXTGEN). EcoDemonstrator is a Boeing test program which utilizes advanced experimental equipment to accelerate the science of aerospace and environmentally friendly technologies. The ASTAR Flight Test provided a proof-of-concept flight demonstration that exercised an algorithmic-based application in an actual aircraft. The test aircraft conducted Interval Management operations to provide time-based spacing off a target aircraft in non-simulator wind conditions. Work was conducted as a joint effort between NASA and Boeing to integrate ASTAR in a Boeing supplied B787 test aircraft while using a T-38 aircraft as the target. This demonstration was also used to identify operational risks to future flight trials for the NASA Air Traffic Management Technology Demonstration expected in 2017.
75 FR 68688 - Airworthiness Directives; The Boeing Company Model 757 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-09
...We are adopting a new airworthiness directive (AD) for all Model 757 airplanes. This AD requires changing the lower fixed leading edge panel assemblies immediately outboard of the nacelles at slats 4 and 7. This AD results from reports of Model 757 airplanes in service that have drain holes and unsealed panel assemblies in the fixed leading edge adjacent to the inboard end of slats 4 and 7 that are too close to the hot portion of the engines. We are issuing this AD to prevent fuel leaking onto an engine and a consequent fire.
Commerical Crew Astronauts Visit Launch Complex 39A
2018-03-27
Commercial Crew Program astronauts, from the left, Suni Williams, Eric Boe, Bob Behnken and Doug Hurley take in the view from the top of Launch Complex 39A at Kennedy Space Center. The astronauts toured the pad for an up-close look at modifications that are in work for the SpaceX Crew Dragon flight tests. Tower modifications included l removal of the space shuttle era rotating service structure. Future integration of the crew access arm will allow for safe crew entry for launch and exit from the spacecraft in the unlikely event a pad abort is required.
Commerical Crew Astronauts Visit Launch Complex 39A
2018-03-27
Commercial Crew Program astronauts, from the left Doug Hurley, Eric Boe, Bob Behnken and Suni Williams, pose just outside Launch Complex 39A at NASA's Kennedy Space Center in Florida. The astronauts toured the pad for an up-close look at modifications that are in work for the SpaceX Crew Dragon flight tests. The tower modifications included removal of the space shuttle era rotating service structure. Future integration of the crew access arm will allow for safe crew entry for launch and exit from the spacecraft in the unlikely event a pad abort is required.
1998-11-16
In the Payload Hazardous Servicing Facility, workers place one of the Stardust solar panels on a stand. The panels are being removed for testing. The spacecraft Stardust will use a unique medium called aerogel to capture comet particles flying off the nucleus of comet Wild 2 in January 2004, plus collect interstellar dust for later analysis. Stardust will be launched aboard a Boeing Delta 7426 rocket from Complex 17, Cape Canaveral Air Station, targeted for Feb. 6, 1999. The collected samples will return to Earth in a re-entry capsule to be jettisoned from Stardust as it swings by Earth in January 2006
1999-01-11
In the Payload Hazardous Servicing Facility, workers look over the solar panels on the Stardust spacecraft that are deployed for lighting tests. Stardust is scheduled to be launched aboard a Boeing Delta II rocket from Launch Pad 17A, Cape Canaveral Air Station, on Feb. 6, 1999, for a rendezvous with the comet Wild 2 in January 2004. Stardust will use a substance called aerogel to capture comet particles flying off the nucleus of the comet, plus collect interstellar dust for later analysis. The collected samples will return to Earth in a sample return capsule to be jettisoned as it swings by Earth in January 2006
1998-11-16
In the Payload Hazardous Servicing Facility, workers remove one of the Stardust solar panels for testing. The spacecraft Stardust will be launched aboard a Boeing Delta 7426 rocket from Complex 17, Cape Canaveral Air Station, targeted for Feb. 6, 1999. Stardust will use a unique medium called aerogel to capture comet particles flying off the nucleus of comet Wild 2 in January 2004, plus collect interstellar dust for later analysis. The collected samples will return to Earth in a re-entry capsule (seen on top, next to the solar panel) to be jettisoned from Stardust as it swings by Earth in January 2006
1999-01-11
In the Payload Hazardous Servicing Facility, workers adjust the solar panels of the Stardustspacecraft before performing lighting tests. Stardust is scheduled to be launched aboard a Boeing Delta II rocket from Launch Pad 17A, Cape Canaveral Air Station, on Feb. 6, 1999, for a rendezvous with the comet Wild 2 in January 2004. Stardust will use a substance called aerogel to capture comet particles flying off the nucleus of the comet, plus collect interstellar dust for later analysis. The collected samples will return to Earth in a sample return capsule to be jettisoned as it swings by Earth in January 2006
1999-01-11
Workers in the Payload Hazardous Servicing Facility deploy a solar panel on the Stardust spacecraft before performing lighting tests. Stardust is scheduled to be launched aboard a Boeing Delta II rocket from Launch Pad 17A, Cape Canaveral Air Station, on Feb. 6, 1999, for a rendezvous with the comet Wild 2 in January 2004. Stardust will use a substance called aerogel to capture comet particles flying off the nucleus of the comet, plus collect interstellar dust for later analysis. The collected samples will return to Earth in a sample return capsule to be jettisoned as it swings by Earth in January 2006
1999-01-11
In the Payload Hazardous Servicing Facility, a worker (left) conducts lighting tests on the fully extended solar panels of the Stardustspacecraft. Stardust is scheduled to be launched aboard a Boeing Delta II rocket from Launch Pad 17A, Cape Canaveral Air Station, on Feb. 6, 1999, for a rendezvous with the comet Wild 2 in January 2004. Stardust will use a substance called aerogel to capture comet particles flying off the nucleus of the comet, plus collect interstellar dust for later analysis. The collected samples will return to Earth in a sample return capsule to be jettisoned as it swings by Earth in January 2006
1998-11-16
In the Payload Hazardous Servicing Facility, workers remove the Stardust solar panels for testing. The spacecraft Stardust will use a unique medium called aerogel to capture comet particles flying off the nucleus of comet Wild 2 in January 2004, plus collect interstellar dust for later analysis. Stardust will be launched aboard a Boeing Delta 7426 rocket from Complex 17, Cape Canaveral Air Station, targeted for Feb. 6, 1999. The collected samples will return to Earth in a re-entry capsule (seen at the top of the spacecraft in this photo) to be jettisoned from Stardust as it swings by Earth in January 2006
2003-02-19
KENNEDY SPACE CENTER, FLA. -- - At NASA's Family & Community Mars Exploration Day, held in Cape Canaveral, Fla., Kristie Durham (left), Martha Vreeland (center), and Jeanne Hawkins (right), with Expendable Launch Vehicle Services, offer information about the facility. The event informed students and the general public about Florida's key role as NASA's "Gateway to Mars" and offered an opportunity to meet with scientists, engineers, educators and others working Mars exploration missions. The Mars Exploration Rovers are being prepared for launch this spring aboard Boeing Delta II rockets from the Cape Canaveral Air Force Station. They will land on Mars and start exploring in January 2004.
NASA Technical Reports Server (NTRS)
2003-01-01
KENNEDY SPACE CENTER, FLA. -- - At NASA's Family & Community Mars Exploration Day, held in Cape Canaveral, Fla., Kristie Durham (left), Martha Vreeland (center), and Jeanne Hawkins (right), with Expendable Launch Vehicle Services, offer information about the facility. The event informed students and the general public about Florida's key role as NASA's 'Gateway to Mars' and offered an opportunity to meet with scientists, engineers, educators and others working Mars exploration missions. The Mars Exploration Rovers are being prepared for launch this spring aboard Boeing Delta II rockets from the Cape Canaveral Air Force Station. They will land on Mars and start exploring in January 2004.
2013-01-11
TITUSVILLE, Fla. - In the Astrotech payload processing facility in Titusville, Fla. near NASA’s Kennedy Space Center, a t Boeing technician checks out the Tracking and Data Relay Satellite, TDRS-K. Launch of the TDRS-K on the Atlas V rocket is planned for January 29, 2013. The TDRS-K spacecraft is part of the next-generation series in the Tracking and Data Relay Satellite System, a constellation of space-based communication satellites providing tracking, telemetry, command and high-bandwidth data return services. For more information, visit http://www.nasa.gov/mission_pages/tdrs/index.html Photo credit: NASA/Jim Grossmann
2004-06-22
KENNEDY SPACE CENTER, FLA. - At Space Launch Complex 2 on North Vandenberg Air Force Base, Calif., the Aura spacecraft arrives at the top of the mobile service tower, or gantry. It will be moved and then mated with the second stage of the Boeing Delta II rocket. The latest in the Earth Observing System (EOS) series, Aura is scheduled to launch July 10. Aura’s four state-of-the-art instruments will study the dynamics of chemistry occurring in the atmosphere. The spacecraft will provide data to help scientists better understand the Earth’s ozone, air quality and climate change.
2004-06-22
KENNEDY SPACE CENTER, FLA. - Inside the mobile service tower, or gantry, at Space Launch Complex 2 on North Vandenberg Air Force Base, Calif., the Aura spacecraft is lowered toward the second stage of the Boeing Delta II rocket. After it is mated with the second stage, the fairing will be installed. The latest in the Earth Observing System (EOS) series, Aura is scheduled to launch July 10. Aura’s four state-of-the-art instruments will study the dynamics of chemistry occurring in the atmosphere. The spacecraft will provide data to help scientists better understand the Earth’s ozone, air quality and climate change.
2004-06-22
KENNEDY SPACE CENTER, FLA. - Inside the mobile service tower, or gantry, at Space Launch Complex 2 on North Vandenberg Air Force Base, Calif., workers help guide the Aura spacecraft toward the second stage of the Boeing Delta II rocket. After mating with the second stage, the fairing will be installed. The latest in the Earth Observing System (EOS) series, Aura is scheduled to launch July 10. Aura’s four state-of-the-art instruments will study the dynamics of chemistry occurring in the atmosphere. The spacecraft will provide data to help scientists better understand the Earth’s ozone, air quality and climate change.
2004-06-22
KENNEDY SPACE CENTER, FLA. - Inside the mobile service tower, or gantry, at Space Launch Complex 2 on North Vandenberg Air Force Base, Calif., the Aura spacecraft is maneuvered into position over the second stage of the Boeing Delta II rocket. After it is mated with the second stage, the fairing will be installed. The latest in the Earth Observing System (EOS) series, Aura is scheduled to launch July 10. Aura’s four state-of-the-art instruments will study the dynamics of chemistry occurring in the atmosphere. The spacecraft will provide data to help scientists better understand the Earth’s ozone, air quality and climate change.
2004-07-06
KENNEDY SPACE CENTER, FLA. - On Pad 17-B, Cape Canaveral Air Force Station, workers move the Boeing Delta II Heavy second-stage engine, the Aerojet AJ10-118K, inside the mobile service tower. The engine will be mated with the first stage of the Delta II, which is the launch vehicle for the MESSENGER (Mercury Surface, Space Environment, Geochemistry and Ranging) spacecraft, scheduled to lift off Aug. 2. Bound for Mercury, the spacecraft is expected to reach orbit around the planet in March 2011. MESSENGER was built for NASA by the Johns Hopkins University Applied Physics Laboratory in Laurel, Md.
2004-07-06
KENNEDY SPACE CENTER, FLA. - - The Boeing Delta II Heavy second-stage engine, the Aerojet AJ10-118K, approaches the top of the mobile service tower on Pad 17-B, Cape Canaveral Air Force Station. The engine will be mated with the first stage of the Delta II, which is the launch vehicle for the MESSENGER (Mercury Surface, Space Environment, Geochemistry and Ranging) spacecraft, scheduled to lift off Aug. 2. Bound for Mercury, the spacecraft is expected to reach orbit around the planet in March 2011. MESSENGER was built for NASA by the Johns Hopkins University Applied Physics Laboratory in Laurel, Md.
2006-07-13
KENNEDY SPACE CENTER, FLA. - Inside the mobile service tower on Launch Pad 17-B on Cape Canaveral Air Force Station, workers stand by as the Boeing Delta II second stage for the STEREO launch is lowered onto the first stage for mating. STEREO stands for Solar Terrestrial Relations Observatory and comprises two spacecraft. The STEREO mission is the first to take measurements of the sun and solar wind in 3-dimension. This new view will improve our understanding of space weather and its impact on the Earth. STEREO is expected to lift off in August 2006. Photo credit: NASA/George Shelton
2006-08-05
KENNEDY SPACE CENTER, FLA. - Inside the mobile service tower on Launch Pad 17-B at Cape Canaveral Air Force Station, the second stage of the Boeing Delta II launch vehicle for the STEREO spacecraft is being remated with the Delta first stage. STEREO stands for Solar Terrestrial Relations Observatory and comprises two spacecraft. The STEREO mission is the first to take measurements of the sun and solar wind in 3-dimension. This new view will improve our understanding of space weather and its impact on the Earth. STEREO is expected to lift off on Aug. 31. Photo credit: NASA/Dimitri Gerondidakis
Systems engineering in a joint program environment: the joint helmet-mounted cueing system
NASA Astrophysics Data System (ADS)
Wilkins, Donald F.
1999-07-01
The Joint Helmet Mounted Cueing System (JHMCS) is a design program involving two airframe companies (Boeing and Lockheed Martin), two services (USAF and USN) and four aircraft platforms: the F-22, the F-16, the F/A-18 and the F-15. Developing equipment requirements for the combined operational and environmental needs of these diverse communities is a significant challenge. In addition, the team is geographically dispersed which presented challenges in communication and coordination. This paper details the lessons learned in producing a cost-effective design within a short development schedule and makes recommendations for future development programs.
1998-09-17
KENNEDY SPACE CENTER, FLA. -- Workers in the Payload Hazardous Servicing Facility prepare Deep Space 1 for launch aboard a Boeing Delta 7326 rocket in October. The first flight in NASA's New Millennium Program, Deep Space 1 is designed to validate 12 new technologies for scientific space missions of the next century. Onboard experiments include an ion propulsion engine and software that tracks celestial bodies so the spacecraft can make its own navigation decisions without the intervention of ground controllers. Most of its mission objectives will be completed within the first two months. A near-Earth asteroid, 1992 KD, has also been selected for a possible flyby
2006-07-13
KENNEDY SPACE CENTER, FLA. - Inside the mobile service tower on Launch Pad 17-B on Cape Canaveral Air Force Station, the Boeing Delta II second stage for the STEREO launch is lowered toward the first stage. The two stages will be mated. STEREO stands for Solar Terrestrial Relations Observatory and comprises two spacecraft. The STEREO mission is the first to take measurements of the sun and solar wind in 3-dimension. This new view will improve our understanding of space weather and its impact on the Earth. STEREO is expected to lift off in August 2006. Photo credit: NASA/George Shelton
Deep Space 1 is prepared for launch
NASA Technical Reports Server (NTRS)
1998-01-01
Workers in the Payload Hazardous Servicing Facility prepare Deep Space 1 for launch aboard a Boeing Delta 7326 rocket in October. The first flight in NASA's New Millennium Program, Deep Space 1 is designed to validate 12 new technologies for scientific space missions of the next century. Onboard experiments include an ion propulsion engine and software that tracks celestial bodies so the spacecraft can make its own navigation decisions without the intervention of ground controllers. Most of its mission objectives will be completed within the first two months. A near- Earth asteroid, 1992 KD, has also been selected for a possible flyby.
NASA Technical Reports Server (NTRS)
Scanlon, Charles H.
1988-01-01
The Automatic En Route Air Traffic Control (AERA) and the Advanced Automated System (AAS) of the NAS plan, call for utilization of data links for such items as computer generated flight clearances, enroute minimum safe altitude warnings, sector probes, out of conformance check, automated flight services, and flow management of advisories. A major technical challenge remaining is the integration, flight testing, and validation of data link equipment and procedures in the aircraft cockpit. The flight test organizational chart, was designed to have the airplane side of data link experiments implemented in the NASA Langley Research Center (LaRC) experimental Boeing 737 airplane. This design would enable investigations into implementation of data link equipment and pilot interface, operations, and procedures. The illustrated ground system consists of a work station with links to a national weather database and a data link transceiver system. The data link transceiver system could be a Mode-S transponder, ACARS, AVSAT, or another type of radio system such as the military type HF data link. The airborne system was designed so that a data link transceiver, workstation, and touch panel could be interfaced with an input output processor to the aircraft system bus and thus have communications access to other digital airplane systems.
77 FR 24831 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-26
... Airworthiness Directives; The Boeing Company Airplanes AGENCY: Federal Aviation Administration (FAA), DOT... Company Model 737-100, -200, -200C, -300, -400, and -500 series airplanes equipped with analog transient suppression devices (ATSDs) installed in accordance with Supplemental Type Certificate ST00146BO. This AD was...
Crew interface with windshear systems
NASA Technical Reports Server (NTRS)
Carbaugh, Dave
1988-01-01
A review is given of the areas within Boeing that are working on the NASA contract to conduct windshear studies. A synopsis is given of the work that Boeing Flight Deck Research is doing. A short review of nuisance and alerts is given in light of upcoming forward look technology.
78 FR 58962 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-25
...) and Certification Maintenance Requirements (CMRs) of Boeing 747-400 Maintenance Planning Data (MPD... that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by... access door is found, before further flight, replace with an impact-resistant access door, in accordance...
14 CFR 125.509 - Flammability reduction means.
Code of Federal Regulations, 2012 CFR
2012-01-01
... operational. Table 1 Model—Boeing Model—Airbus 747 Series A318, A319, A320, A321 Series 737 Series A330, A340... comply with § 26.33(c) of this chapter. Table 2 Model—Boeing Model—Airbus 747 Series A318, A319, A320...
14 CFR 125.509 - Flammability reduction means.
Code of Federal Regulations, 2014 CFR
2014-01-01
... operational. Table 1 Model—Boeing Model—Airbus 747 Series A318, A319, A320, A321 Series 737 Series A330, A340... comply with § 26.33(c) of this chapter. Table 2 Model—Boeing Model—Airbus 747 Series A318, A319, A320...
14 CFR 125.509 - Flammability reduction means.
Code of Federal Regulations, 2013 CFR
2013-01-01
... operational. Table 1 Model—Boeing Model—Airbus 747 Series A318, A319, A320, A321 Series 737 Series A330, A340... comply with § 26.33(c) of this chapter. Table 2 Model—Boeing Model—Airbus 747 Series A318, A319, A320...
14 CFR 125.509 - Flammability reduction means.
Code of Federal Regulations, 2011 CFR
2011-01-01
... operational. Table 1 Model—Boeing Model—Airbus 747 Series A318, A319, A320, A321 Series 737 Series A330, A340... comply with § 26.33(c) of this chapter. Table 2 Model—Boeing Model—Airbus 747 Series A318, A319, A320...
Guidelines for Hosted Payload Integration
2014-06-06
Micopac markking@micropac.com Andrew King Boeing andrew.m.king@boeing.com Byron Knight NRO knightby@nro.mil Hans Koenigsmann SpaceX hans.koenigsmann...jdsu.com Marvin VanderWeg SpaceX marvin.vanderwag@spacex.c om Gerrit VanOmmering SSL gerrit.vanommering@sslmda. com Michael Verzuh Ball mverzuh@ball.com
The implementation and use of Ada on distributed systems with high reliability requirements
NASA Technical Reports Server (NTRS)
Knight, J. C.
1986-01-01
The general inadequacy of Ada for programming systems that must survive processor loss was shown. A solution to the problem was proposed in which there are no syntatic changes to Ada. The approach was evaluated using a full-scale, realistic application. The application used was the Advanced Transport Operating System (ATOPS), an experimental computer control system developed for a modified Boeing 737 aircraft. The ATOPS system is a full authority, real-time avionics system providing a large variety of advanced features. Methods of building fault tolerance into concurrent systems were explored. A set of criteria by which the proposed method will be judged was examined. Extensive interaction with personnel from Computer Sciences Corporation and NASA Langley occurred to determine the requirements of the ATOPS software. Backward error recovery in concurrent systems was assessed.
1997-09-23
Boeing technicians, from right, John Pearce Jr., Mike Vawter and Rob Ferraro prepare a Russian replacement computer for stowage aboard the Space Shuttle Atlantis shortly before the scheduled launch of Mission STS-86, slated to be the seventh docking of the Space Shuttle with the Russian Space Station Mir. The preparations are being made at the SPACEHAB Payload Processing Facility in Cape Canaveral. The last-minute cargo addition requested by the Russians will be mounted on the aft bulkhead of the SPACEHAB Double Module, which is being used as a pressurized cargo container for science/logistical equipment and supplies that will be exchanged between Atlantis and the Mir. Using the Module Vertical Access Kit (MVAC), technicians will be lowered inside the module to install the computer for flight. Liftoff of STS-86 is scheduled Sept. 25 at 10:34 p.m. from Launch Pad 39A
1997-09-23
Boeing technicians John Pearce Jr., at left, and Mike Vawter prepare a Russian replacement computer for stowage aboard the Space Shuttle Atlantis shortly before the scheduled launch of Mission STS-86, slated to be the seventh docking of the Space Shuttle with the Russian Space Station Mir. The preparations are being made at the SPACEHAB Payload Processing Facility in Cape Canaveral. The last-minute cargo addition requested by the Russians will be mounted on the aft bulkhead of the SPACEHAB Double Module, which is being used as a pressurized cargo container for science/logistical equipment and supplies that will be exchanged between Atlantis and the Mir. Using the Module Vertical Access Kit (MVAC), technicians will be lowered inside the module to install the computer for flight. Liftoff of STS-86 is scheduled Sept. 25 at 10:34 p.m. from Launch Pad 39A
Magnetic field exposure of commercial airline pilots.
Hood; Nicholas; Butler; Lackland; Hoel; Mohr
2000-10-01
PURPOSE: Airline pilots are exposed to magnetic fields generated by the aircraft's electrical and electronic systems. The purpose of this study was to directly measure the flight deck magnetic fields to which commercial airline pilots are exposed when flying on different aircraft types over a 75-hour flight-duty month.METHODS: Magentic field measurements were taken using personal dosimeters capable of measuring magnetic fields in the 40-800 Hz frequency range. Dosimeters were carried by either the Captain or the First Officer on Boeing 737/200, Boeing 747/400, Boeing 767/300ER, and Airbus 320 aircraft. The data were analyzed by aircraft type, with statistics based on block hours. Block hours begin when the aircraft departs the gate prior to take off and end when the aircraft returns to the gate after landing.RESULTS: Approximately 1008 block hours were recorded at a sampling rate of 3 seconds. Total block time exposure to the pilots ranged from a harmonic geometric mean of 6.7 milliGauss (mG) for the Boeing 767/300ER to 12.7 mG for the Boeing 737/200.CONCLUSIONS: Measured flight deck magnetic field levels were substantially above the 0.8 to 1 mG level typically found in the home or office and suggest the need for further study to evaluate potential health effects of long-term exposure.
Shepperd, Christopher J; Eldridge, Alison; Camacho, Oscar M; McAdam, Kevin; Proctor, Christopher J; Meyer, Ingo
2013-06-01
Reduced toxicant prototype (RTP) cigarettes with substantially reduced levels of tobacco smoke toxicants have been developed. Evaluation of these prototype cigarettes included measurement of biomarkers of exposure (BoE) to toxicants in smokers switched from conventional cigarettes to the RTPs. A 6-week single-blinded randomised controlled study with occasional clinical confinement was conducted ( ISRCTN7215735). All smoking subjects smoked a conventional cigarette for 2-weeks. Control groups continued to smoke the conventional cigarette while test groups switched to one of three RTP designs. Clinical confinement and additional assessments were performed for all smoking groups after 2 and 4-weeks. A non-smoker group provided background levels of BoE. On average, smokers switched to RTPs with reduced machine yields of toxicants had reduced levels of corresponding BoEs. For vapour phase toxicants such as acrolein and 1,3-butadiene reductions of ⩾70% were observed both in smoke chemistry and BoEs. Reductions in particulate phase toxicants such as tobacco-specific nitrosamines, aromatic amines and polyaromatic hydrocarbons depended upon the technologies used, but were in some cases ⩾80% although some increases in other particulate phase toxicants were observed. However, reductions in BoEs demonstrate that it is possible to produce prototype cigarettes that reduce exposure to toxicants in short-term use. Copyright © 2013 Elsevier Inc. All rights reserved.
Navier-Stokes Flowfield Simulation of Boeing 747-200 as Platform for SOFIA
NASA Technical Reports Server (NTRS)
Srinivasan, G.R.
1994-01-01
Steady and unsteady viscous, three-dimensional flowfields are calculated using a thin layer approximation of Navier-Stokes equations in conjunction with Chimera overset grids. The finite-difference numerical scheme uses structured grids and a pentadiagonal flow solver called "OVERFLOW". The configuration of Boeing 747-200 has been chosen as one of configurations to be used as a platform for the SOFIA (Stratospheric Observatory For Infrared Astronomy). Initially, the steady flowfield of the full aircraft is calculated for the clean configuration (without a cavity to house telescope). This solution is then used to start the unsteady flowfield of a configuration containing cavity housing the observation telescope and its peripheral units. Analysis of unsteady flowfield in the cavity and its influence on the tail empennage, as well as the noise due to turbulence and optical quality of the flow are the main focus of this study. For the configuration considered here, the telescope housing cavity is located slightly downstream of the portwing. The entire flow-field is carefully constructed using 45 overset grids and consists of nearly 4 million grid points. All the computations axe done at one freestream flow condition of M(sub infinity) = 0.85, alpha = 2.5deg, and a Reynolds of Re = 1.85x10deg
Dynamic Stall Measurements and Computations for a VR-12 Airfoil with a Variable Droop Leading Edge
NASA Technical Reports Server (NTRS)
Martin, P. B.; McAlister, K. W.; Chandrasekhara, M. S.; Geissler, W.
2003-01-01
High density-altitude operations of helicopters with advanced performance and maneuver capabilities have lead to fundamental research on active high-lift system concepts for rotor blades. The requirement for this type of system was to improve the sectional lift-to-drag ratio by alleviating dynamic stall on the retreating blade while simultaneously reducing the transonic drag rise of the advancing blade. Both measured and computational results showed that a Variable Droop Leading Edge (VDLE) airfoil is a viable concept for application to a rotor high-lift system. Results are presented for a series of 2D compressible dynamic stall wind tunnel tests with supporting CFD results for selected test cases. These measurements and computations show a dramatic decrease in the drag and pitching moment associated with severe dynamic stall when the VDLE concept is applied to the Boeing VR-12 airfoil. Test results also show an elimination of the negative pitch damping observed in the baseline moment hysteresis curves.
NASA Technical Reports Server (NTRS)
Bohnhoff-Hlavacek, Gail
1992-01-01
One of the objectives of the team supporting the LDEF Systems and Materials Special Investigative Groups is to develop databases of experimental findings. These databases identify the hardware flown, summarize results and conclusions, and provide a system for acknowledging investigators, tracing sources of data, and future design suggestions. To date, databases covering the optical experiments, and thermal control materials (chromic acid anodized aluminum, silverized Teflon blankets, and paints) have been developed at Boeing. We used the Filemaker Pro software, the database manager for the Macintosh computer produced by the Claris Corporation. It is a flat, text-retrievable database that provides access to the data via an intuitive user interface, without tedious programming. Though this software is available only for the Macintosh computer at this time, copies of the databases can be saved to a format that is readable on a personal computer as well. Further, the data can be exported to more powerful relational databases, capabilities, and use of the LDEF databases and describe how to get copies of the database for your own research.
Optimization Issues with Complex Rotorcraft Comprehensive Analysis
NASA Technical Reports Server (NTRS)
Walsh, Joanne L.; Young, Katherine C.; Tarzanin, Frank J.; Hirsh, Joel E.; Young, Darrell K.
1998-01-01
This paper investigates the use of the general purpose automatic differentiation (AD) tool called Automatic Differentiation of FORTRAN (ADIFOR) as a means of generating sensitivity derivatives for use in Boeing Helicopter's proprietary comprehensive rotor analysis code (VII). ADIFOR transforms an existing computer program into a new program that performs a sensitivity analysis in addition to the original analysis. In this study both the pros (exact derivatives, no step-size problems) and cons (more CPU, more memory) of ADIFOR are discussed. The size (based on the number of lines) of the VII code after ADIFOR processing increased by 70 percent and resulted in substantial computer memory requirements at execution. The ADIFOR derivatives took about 75 percent longer to compute than the finite-difference derivatives. However, the ADIFOR derivatives are exact and are not functions of step-size. The VII sensitivity derivatives generated by ADIFOR are compared with finite-difference derivatives. The ADIFOR and finite-difference derivatives are used in three optimization schemes to solve a low vibration rotor design problem.
76 FR 68666 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-07
... control system (ECS) wrapped with Boeing Material Specification (BMS) 8-39 or Aeronautical Materials... deteriorate with age. This proposed AD would require reworking certain air distribution ducts in the ECS. We... the duct assemblies of the ECS due to a potential electrical arc, which could start a small fire and...
77 FR 12506 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-01
... (AD) for certain The Boeing Company Model 757 airplanes. This proposed AD was prompted by fuel system... indication system (FQIS) wiring or fuel tank systems to prevent development of an ignition source inside the... systems. As a result of those findings, we issued a regulation titled ``Transport Airplane Fuel Tank...
78 FR 22172 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-15
... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 39 [Docket No. FAA-2011-1094; Directorate Identifier 2011-NM-070-AD; Amendment 39-17412; AD 2013-07-08] RIN 2120-AA64... directive (AD): 2013-07-08 The Boeing Company: Amendment 39-17412; Docket No. FAA- 2011-1094; Directorate...
The Boeing Company's Manufacturing Technology Student Internship. Evaluation Report.
ERIC Educational Resources Information Center
Owens, Thomas R.
The Boeing Company contracted with the Northwest Regional Educational Laboratory to evaluate its student internship program, part of a "school-to-work" effort modeled after the nationally recognized Tech Prep initiative. The company's involvement in the Tech Prep Program has been implemented in three phases: (1) the initial phase helped…
VIEW OF BOEING 737200 FUSELAGE FROM TOP LEVEL OF TAIL ...
VIEW OF BOEING 737-200 FUSELAGE FROM TOP LEVEL OF TAIL DOCK AND. A NEW SAFETY CABLE FROM THE TAIL DOCK WILL ALLOW INSPECTORS TO WALK UP AND DOWN THE FUSELAGE TO CHECK FOR CRACKS OR MISSING FASTENERS. - Greater Buffalo International Airport, Maintenance Hangar, Buffalo, Erie County, NY
Boe and Bowen on Middeck with LiOH canisters
2011-02-28
S133-E-007942 (28 Feb. 2011) --- NASA astronauts Eric Boe (left), STS-133 pilot; and Steve Bowen, mission specialist, work with lithium hydroxide (LiOH) canisters from beneath space shuttle Discovery’s middeck while docked with the International Space Station. Photo credit: NASA or National Aeronautics and Space Administration
78 FR 6200 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-30
... by installing a placard with the new (reduced) maximum load. We disagree because the customer COS box.... ACTION: Final rule. SUMMARY: We are adopting a new airworthiness directive (AD) for certain The Boeing... under forward load levels less than the 9 g forward load requirements as defined by certain regulations...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-30
... Boeing Company, St. Louis, MO February 24, 2009. Engineering Operations, etc., Off-Site Workers Reporting to St. Louis, MO. 73,635A The Boeing Company, St. Charles, MO February 24, 2009. Engineering... 24, 2009. Engineering Operations & Technology Div. & Information Technology Div. 73,753 Lodging by...
STS-133 crew members Lindsey, Boe and Drew during Tool/Repair Kits training with instructor
2010-01-26
JSC2010-E-014266 (26 Jan. 2010) --- NASA astronauts Steve Lindsey (right), STS-133 commander; and Eric Boe, pilot, participate in an ISS tools and repair kits training session in the Space Vehicle Mock-up Facility at NASA's Johnson Space Center.
77 FR 63266 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-16
...-1073; Directorate Identifier 2012-NM-078-AD] RIN 2120-AA64 Airworthiness Directives; The Boeing Company... to an address listed under the ADDRESSES section. Include ``Docket No. FAA-2012-1073; Directorate.... FAA-2012-1073; Directorate Identifier 2012-NM-078-AD. (a) Comments Due Date We must receive comments...
78 FR 25374 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-01
... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 39 [Docket No. FAA-2012-1073; Directorate Identifier 2012-NM-078-AD; Amendment 39-17430; AD 2013-08-13] RIN 2120-AA64...-13 The Boeing Company: Amendment 39-17430; Docket No. FAA- 2012-1073; Directorate Identifier 2012-NM...
77 FR 58330 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
... requires repetitive inspections of the aft attach lugs of the elevator tab control mechanisms, and replacement of any discrepant elevator tab control mechanism. Since we issued that AD, Boeing has developed a modification of the aft attach lugs of the elevator tab control mechanisms, which will adequately address the...
DOT National Transportation Integrated Search
1971-07-01
This report presents the basic equations and data required to simulate the Convair CV-880 and Boeing 720 B aircraft-autopilot systems in the approach configuration from altitude and heading hold down to flare. The approach maneuver is discussed in Se...
Boeing engineers perform air flow balance testing.
2017-10-05
Boeing engineers, Chris Chapman, left, Greg Clark, center, and Ashesh Patel, right, perform air flow balance testing on NASA's new Basic Express Racks. The racks, developed at Marshall, will expand the capabilities for science research aboard the International Space Station. Delivery to the station is scheduled for late 2018.
Advanced composite stabilizer for Boeing 737 aircraft
NASA Technical Reports Server (NTRS)
1978-01-01
Activities related to development of an advanced composites stabilizer for the Boeing 737 commercial transport are reported. Activities include discussion of criteria and objectives, design loads, the fatigue spectrum definition to be used for all spectrum fatigue testing, fatigue analysis, manufacturing producibility studies, the ancillary test program, quality assurance, and manufacturing development.
The Boeing Company's Manufacturing Technology Student Internship. Evaluation Report (1994-95).
ERIC Educational Resources Information Center
Wang, Changhua; Owens, Thomas R.
An evaluation was conducted of the Boeing Company's summer internship program for students enrolled in a manufacturing technology program after grades 11, 12, and 13 (first year of community college). The evaluation included the following activities: a review of documents describing the internship structure, student selection process, and…
NASA's Boeing 747 SCA with the Space Shuttle Endeavour on top climbs out after takeoff from Edwards
NASA Technical Reports Server (NTRS)
2001-01-01
NASA's modified Boeing 747 Shuttle Carrier Aircraft with the Space Shuttle Endeavour on top climbs out after takeoff from Edwards Air Force Base on the first leg of its ferry flight back to the Kennedy Space Center in Florida.