Sample records for bridge construction zone

  1. 75 FR 21990 - Safety Zone; Extended Debris Removal in the Lake Champlain Bridge Construction Zone (Between...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-27

    ...-AA00 Safety Zone; Extended Debris Removal in the Lake Champlain Bridge Construction Zone (Between... surrounding the Lake Champlain Bridge construction zone between Chimney Point, VT and Crown Point, NY. This... of debris from the old Crown Point bridge demolition. The debris must be cleared from the navigable...

  2. 77 FR 25080 - Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ...-AA00 Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR AGENCY: Coast Guard, DHS... trestles and construction cranes involved in the construction of the TriMet Bridge on the Willamette River... project. These safety zones replace the prior safety zones established for the TriMet Bridge construction...

  3. 78 FR 37969 - Safety Zone; South Park Bridge Construction, Lower Duwamish Waterway, Seattle, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ...-AA00 Safety Zone; South Park Bridge Construction, Lower Duwamish Waterway, Seattle, WA AGENCY: Coast... zone in the lower Duwamish Waterway around the South Park Bridge in Seattle, Washington for the re-construction of the bridge. The safety zone is necessary to ensure the safety of the maritime public and...

  4. 77 FR 20719 - Safety Zone; Matlacha Bridge Construction, Matlacha Pass, Matlacha, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ...-AA00 Safety Zone; Matlacha Bridge Construction, Matlacha Pass, Matlacha, FL AGENCY: Coast Guard, DHS... waters of Matlacha Pass in the vicinity of the Matlacha Bridge in Matlacha, Florida. The safety zone will be enforced during construction of the Matlacha Bridge from Monday, March 12, 2012 through Tuesday...

  5. 75 FR 22228 - Regulated Navigation Area; Lake Champlain Bridge Construction Zone, NY and VT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-28

    ...-AA11 Regulated Navigation Area; Lake Champlain Bridge Construction Zone, NY and VT AGENCY: Coast Guard... establishing a regulated navigation area around the construction zone of the Lake Champlain Bridge between... on all vessels transiting the navigable waters of Lake Champlain in the vicinity of the bridge...

  6. 77 FR 1870 - Safety Zone; Matlacha Bridge Construction, Matlacha Pass, Matlacha, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ...-AA00 Safety Zone; Matlacha Bridge Construction, Matlacha Pass, Matlacha, FL AGENCY: Coast Guard, DHS... waters of Matlacha Pass in the vicinity of the Matlacha Bridge in Matlacha, Florida. The safety zone will be enforced during construction of the Matlacha Bridge from Thursday, December 15, 2011 until Sunday...

  7. 77 FR 70891 - Safety Zone; Bay Bridge Construction, San Francisco Bay, San Francisco, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-28

    ...-AA00 Safety Zone; Bay Bridge Construction, San Francisco Bay, San Francisco, CA AGENCY: Coast Guard... the navigable waters of the San Francisco Bay near Yerba Buena Island, CA in support of the Bay Bridge... construction of the Bay Bridge, the safety zone is necessary to provide for the safety of mariners transiting...

  8. 78 FR 71546 - Safety Zone; Belt Parkway Bridge Construction, Gerritsen Inlet, Brooklyn, NY

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... 1625-AA00 Safety Zone; Belt Parkway Bridge Construction, Gerritsen Inlet, Brooklyn, NY AGENCY: Coast... safety zone on the navigable waters of Gerritsen Inlet surrounding the Belt Parkway Bridge. This proposed rule would allow the Coast Guard to prohibit all vessel traffic through the safety zone during bridge...

  9. 77 FR 15009 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... zones to remain in effect throughout the duration of the construction and renewal of the Sellwood Bridge... safe distance from the construction area while transiting in the vicinity of the Sellwood Bridge...

  10. 76 FR 25278 - Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ...-AA00 Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... safety zone during the construction of the TriMet Bridge on the Willamette River, in Portland, OR. This..., will be starting construction of the new Portland-Milwaukie Light Rail Bridge on July 1, 2011 (with in...

  11. 77 FR 43557 - Safety Zone; Gilmerton Bridge Center Span Float-in, Elizabeth River; Norfolk, Portsmouth, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-25

    ...-AA00 Safety Zone; Gilmerton Bridge Center Span Float-in, Elizabeth River; Norfolk, Portsmouth, and... during the Gilmerton Bridge Center Span Float- in and bridge construction of span placement. This action... Construction, INC will facilitate removal of the existing bascule spans from the Gilmerton Bridge, transport of...

  12. 77 FR 38723 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... effect throughout the duration of the construction and renewal of the Sellwood Bridge located on the... the construction area while transiting in the vicinity of the Sellwood Bridge project; however, the...

  13. 77 FR 14970 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... effect throughout the duration of the construction and renewal of the Sellwood Bridge on the Willamette... construction area while transiting in the vicinity of the Sellwood Bridge project; however, the establishment...

  14. 78 FR 53668 - Regulated Navigation Area; Maine Kennebec Bridge Construction Zone, Kennebec River, Richmond, ME

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    ...-AA11 Regulated Navigation Area; Maine Kennebec Bridge Construction Zone, Kennebec River, Richmond, ME... surrounding the Maine Kennebec Bridge between Richmond, ME, and Dresden, ME. This RNA allows the Coast Guard to enforce speed and wake restrictions and prohibit all vessel traffic through the RNA during bridge...

  15. 77 FR 44544 - Safety Zone; Gilmerton Bridge Center Span Float-In, Elizabeth River; Norfolk, Portsmouth, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ...-AA00 Safety Zone; Gilmerton Bridge Center Span Float-In, Elizabeth River; Norfolk, Portsmouth, and... withdrawing its proposed rule concerning the Gilmerton Bridge Center Span Float-in and bridge construction of... ``Safety Zone; Gilmerton Bridge Center Span Float-in, Elizabeth River; Norfolk, Portsmouth, and Chesapeake...

  16. 77 FR 73541 - Safety Zone: Gilmerton Bridge Center Span Float-in, Elizabeth River; Norfolk, Portsmouth, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ...-AA00 Safety Zone: Gilmerton Bridge Center Span Float-in, Elizabeth River; Norfolk, Portsmouth, and... Gilmerton Bridge Center Span Float- in and bridge construction of span placement. This action is intended to... rulemaking (NPRM) proposing a safety zone in the Gilmerton Bridge Area (77 FR 43557) on September 5-9, 2012...

  17. 78 FR 7670 - Safety Zone; Indian Street Bridge Construction, St. Lucie Canal, Palm City, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... 1625-AA00 Safety Zone; Indian Street Bridge Construction, St. Lucie Canal, Palm City, FL AGENCY: Coast... zone on the St. Lucie Canal, Palm City, Florida to provide for the safety of life and vessels on a... on a narrow waterway. The temporary safety zone encompasses all waters of the St. Lucie Canal in the...

  18. 33 CFR 165.T01-0176 - Regulated Navigation Area; Lake Champlain Bridge Construction, Crown Point, New York and Chimney...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Champlain Bridge Construction, Crown Point, New York and Chimney Point, Vermont. 165.T01-0176 Section 165...; Lake Champlain Bridge Construction, Crown Point, New York and Chimney Point, Vermont. (a) Description... and south of the Lake Champlain Bridge construction zone at Crown Point, New York and Chimney Point...

  19. 77 FR 35900 - Safety Zone; Gilmerton Bridge Center Span Float-in, Elizabeth River; Norfolk, Portsmouth, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ...-AA00 Safety Zone; Gilmerton Bridge Center Span Float-in, Elizabeth River; Norfolk, Portsmouth, and... navigable waters during the Gilmerton Bridge Center Span Float- in and bridge construction of span placement... the existing bascule spans from the Gilmerton Bridge, transport the new center span from the Eastern...

  20. Durability assessment of prefabricated bridge elements and systems : [research summary].

    DOT National Transportation Integrated Search

    2015-08-01

    Many states have instituted Prefabricated Bridge Elements and Systems : (PBES) and Accelerated Bridge Construction (ABC) projects to decrease : onsite construction time, work zone and user costs, and increase safety : factors; however, the quality an...

  1. 78 FR 4331 - Safety Zone; Sellwood Bridge Move; Willamette River, Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... 1625-AA00 Safety Zone; Sellwood Bridge Move; Willamette River, Portland, OR AGENCY: Coast Guard, DHS... the Sellwood Bridge, located on the Willamette River in Portland, Oregon, while it is being relocated 66 feet downriver as part of the new Sellwood Bridge construction project. This action is necessary...

  2. Interaction between drilled shaft and mechanically stabilized earth (MSE) wall : technical report.

    DOT National Transportation Integrated Search

    2017-04-01

    Drilled shafts are being constructed within the reinforced zone of mechanically stabilized earth (MSE) walls especially in the case of overpass bridges where the drilled shafts carry the bridge deck or traffic signs. The interaction between the drill...

  3. Anchorage zone design for pretensioned precast bulb-T bridge girders in Virginia.

    DOT National Transportation Integrated Search

    2009-01-01

    Precast/prestressed concrete girders are commonly used in bridge construction in the United States. The application and diffusion of the prestress force in a pretensioned girder cause a vertical tension force to develop near the end of the beam. Fiel...

  4. Turbidity changes during culvert to bridge upgrades at Carmen Creek, Idaho

    Treesearch

    Randy B. Foltz; Breann Westfall; Ben Kopyscianski

    2012-01-01

    Carmen Creek, a tributary to the Salmon River in Idaho, was the site of two culvert to bridge upgrade operations in September and October 2011. Both locations were upgraded from multiple, large diameter culverts to bridge crossings. Turbidity readings measured at the end of the mixing zone during the nearly three weeks of upgrade construction activities did not exceed...

  5. Assessment of noise environment during construction of a major bridge and associated approach road.

    PubMed

    Roy, T K; Mukhopadhyay, A R; Ghosh, S K; Majumder, G

    2011-10-01

    In this paper a methodology to quantify the noise environment, during a major bridge construction and upgrading approach road connectivity, has been provided. Noise levels were monitored at eleven sites. These eleven sites have been classified into three categories - commercial, residential and silence zones. The study was carried out to measure the ambient noise levels in all the eleven sites falling in the above three categories during both day and night times considering both "working" and "non-working" days. It was found that the mean noise level during night time was more, compared to that during day time for commercial, residential as well as silence zones. The likely causes of more noise during night time have been explored. Appropriate remedial measures have been suggested to reduce the noise levels. In addition, the noise levels in the above three zones have been compared, wherever feasible statistically, with the respective zonal standards. Significance has been found in all the cases. The underlying causes and remedies have been provided.

  6. 33 CFR 165.T11-534 - Safety zone; Bay Bridge construction, San Francisco Bay, San Francisco, CA.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Francisco, CA. (a) Location. This temporary safety zone is established in the navigable waters of the San... construction, San Francisco Bay, San Francisco, CA. 165.T11-534 Section 165.T11-534 Navigation and Navigable... within a box connected by the following points: 37°49′06″ N, 122°21′17″ W; 37°49′01″ N, 122°21′12″ W; 37...

  7. Finite element modeling of residual stresses in electroslag butt welds

    DOT National Transportation Integrated Search

    2000-03-01

    Shop fabricated electroslag (ES) welds used in bridge construction have had a history of low toughness in the fusion and heat affected zones. In addition, conventional inspection of ES weldments under shop fabrication conditions fail to consistently ...

  8. 77 FR 50929 - Security Zones; 2012 RNC Bridge Security Zones, Captain of the Port St. Petersburg Zone, Tampa, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ...-AA87 Security Zones; 2012 RNC Bridge Security Zones, Captain of the Port St. Petersburg Zone, Tampa, FL... temporary security zones around certain bridges on the waters of Pinellas County and Tampa Bay, Florida..., or mooring on waters within 50 yards of the designated bridges during the times that the security...

  9. 77 FR 50921 - Safety Zone: Bay Bridge Load Transfer Safety Zone, San Francisco Bay, San Francisco, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ...-AA00 Safety Zone: Bay Bridge Load Transfer Safety Zone, San Francisco Bay, San Francisco, CA AGENCY... the Bay Bridge Load Transfer Safety Zone from August 1, 2012 through October 31, 2012. This safety... Bay Bridge from the temporary suspension arrangement to the permanent suspension arrangement, the...

  10. 76 FR 78157 - Safety Zone; Eisenhower Expressway Bridge Rehabilitation Project; Chicago River South Branch...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ...-AA00 Safety Zone; Eisenhower Expressway Bridge Rehabilitation Project; Chicago River South Branch... the Eisenhower Expressway Bridge. This temporary safety zone is necessary to protect the surrounding... Bridge. Entry into this zone is prohibited unless specifically authorized by the Captain of the Port...

  11. 76 FR 32313 - Safety Zone; Chelsea St. Bridge Demolition, Chelsea River, Chelsea, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-06

    ...-AA00 Safety Zone; Chelsea St. Bridge Demolition, Chelsea River, Chelsea, MA AGENCY: Coast Guard, DHS... Sector Boston Captain of the Port (COTP) Zone for the demolition of the Chelsea St. Bridge. This safety... Chelsea St. Bridge during the operations surrounding the bridge's demolition and removal. Discussion of...

  12. 75 FR 5511 - Safety Zone; AICW Closure Safety Zone for Ben Sawyer Bridge Replacement Project, Sullivan's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ...-AA00 Safety Zone; AICW Closure Safety Zone for Ben Sawyer Bridge Replacement Project, Sullivan's Island... replacement of the old and new approach spans of the Ben Sawyer Swing Bridge. This regulation is necessary to... proposed rulemaking (NPRM) with respect to this rule because hazards associated with the bridge replacement...

  13. Evaluation of RC Bridge Piers Retrofitted using Fiber-Reinforced Polymer (FRP)

    NASA Astrophysics Data System (ADS)

    Shayanfar, M. A.; Zarrabian, M. S.

    2008-07-01

    For many long years, steel reinforcements have been considered as the only tool for concrete confinements and studied widely, but nowadays application of Fiber Reinforced Polymer (FRP) as an effective alternative is well appreciated. Many bridges have been constructed in the past that are necessary to be retrofitted for resisting against the earthquake motions. The objective of this research is evaluation of nonlinear behavior of RC bridge piers. Eight RC bridge piers have been modeled by ABAQUS software under micromechanical model for homogeneous anisotropic fibers. Also the Bilinear Confinement Model by Nonlinear Transition Zone of Mirmiran has been considered. Then types and angles of fibers and their effects on the final responses were evaluated [1]. Finally, effects of retrofitting are evaluated and some suggestions presented.

  14. 76 FR 52266 - Safety Zone; Coast Guard Exercise, Detroit River, Ambassador Bridge to the Western Tip of Belle Isle

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ...-AA00 Safety Zone; Coast Guard Exercise, Detroit River, Ambassador Bridge to the Western Tip of Belle... Bridge to the western tip of Belle Isle. This safety zone is intended to restrict vessels from portions.... on August 23, 2011. The safety zone will begin at Ambassador Bridge to the western tip of Belle Isle...

  15. 75 FR 53870 - Security Zone, Mackinac Bridge, Straits of Mackinac, Michigan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-02

    ... Zone, Mackinac Bridge, Straits of Mackinac, Michigan AGENCY: Coast Guard, DHS. ACTION: Notice of enforcement of regulation. SUMMARY: The Coast Guard will enforce the Mackinac Bridge Walk security zone on the... bridge. During the enforcement period, navigational and operational restrictions will be placed on all...

  16. 33 CFR 165.928 - Security Zone; Mackinac Bridge, Straits of Mackinac, Michigan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Security Zone; Mackinac Bridge... § 165.928 Security Zone; Mackinac Bridge, Straits of Mackinac, Michigan. (a) Definitions. The following... described above includes all waters on either side of the Mackinac Bridge within one-quarter mile of the...

  17. 33 CFR 165.1110 - Security Zone: Coronado Bay Bridge, San Diego, CA.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Bridge, San Diego, CA. 165.1110 Section 165.1110 Navigation and Navigable Waters COAST GUARD, DEPARTMENT... § 165.1110 Security Zone: Coronado Bay Bridge, San Diego, CA. (a) Location. All navigable waters of San... pilings of the Coronado Bay Bridge. These security zones will not restrict the main navigational channel...

  18. 77 FR 75016 - Safety Zone: Gilmerton Bridge Center Span Float-in, Elizabeth River; Norfolk, Portsmouth, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ...-AA00 Safety Zone: Gilmerton Bridge Center Span Float-in, Elizabeth River; Norfolk, Portsmouth, and... final rule establishing a safety zone around the Gilmerton Bridge center span barge. Inadvertently, this... Gilmerton Bridge center span barge (77 FR 73541). Inadvertently, this rule included an error in the...

  19. 77 FR 12994 - Safety Zone for Margate Bridge, Intracoastal Waterway; Margate, NJ

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-05

    ...-AA00 Safety Zone for Margate Bridge, Intracoastal Waterway; Margate, NJ AGENCY: Coast Guard, DHS... Intracoastal Waterway near Margate, NJ. This safety zone is necessary to ensure safety while the Margate Bridge... this rule. It is impracticable to publish an NPRM because the Margate Bridge Company gave short notice...

  20. 33 CFR 165.1110 - Security Zone: Coronado Bay Bridge, San Diego, CA.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Bridge, San Diego, CA. 165.1110 Section 165.1110 Navigation and Navigable Waters COAST GUARD, DEPARTMENT... § 165.1110 Security Zone: Coronado Bay Bridge, San Diego, CA. (a) Location. All navigable waters of San... pilings of the Coronado Bay Bridge. These security zones will not restrict the main navigational channel...

  1. 75 FR 73962 - Safety Zone; Bridge Demolition; Illinois River, Seneca, IL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-30

    ...-AA00 Safety Zone; Bridge Demolition; Illinois River, Seneca, IL AGENCY: Coast Guard, DHS. ACTION... due to the demolition of the Seneca Highway Bridge. This temporary safety zone is necessary to protect... Highway Bridge. DATES: This rule is effective in the CFR on November 30, 2010 through 6 a.m. on December...

  2. 33 CFR 165.928 - Security Zone; Mackinac Bridge, Straits of Mackinac, Michigan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Security Zone; Mackinac Bridge... § 165.928 Security Zone; Mackinac Bridge, Straits of Mackinac, Michigan. (a) Definitions. The following... described above includes all waters on either side of the Mackinac Bridge within one-quarter mile of the...

  3. 77 FR 62442 - Safety Zone; Oregon City Bridge Grand Opening Fireworks Display; Willamette River, Oregon City, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-15

    ... 1625-AA00 Safety Zone; Oregon City Bridge Grand Opening Fireworks Display; Willamette River, Oregon City, OR AGENCY: Coast Guard, DHS. ACTION: Temporary final rule. SUMMARY: The Coast Guard is establishing a safety zone on the Willamette River between the Oregon City Bridge and the Interstate 205 Bridge...

  4. 76 FR 53054 - Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-25

    ...-AA00 Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... the TriMet Bridge on the Willamette River, in Portland, OR. This action is necessary to ensure the... Zone: TriMet Bridge Project, Willamette River; Portland, OR in the Federal Register (76 FR 86). We...

  5. 76 FR 14829 - Safety Zone; 2011 Hylebos Bridge Restoration, Hylebos Waterway, Tacoma, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ...-AA00 Safety Zone; 2011 Hylebos Bridge Restoration, Hylebos Waterway, Tacoma, WA AGENCY: Coast Guard... temporary safety zone extending 50 yards to the north and south of the Hylebos Bridge, Tacoma, WA in both directions along the entire length of the Hylebos Bridge to ensure the safety of the boating public during...

  6. 75 FR 61354 - Safety Zone; Interstate 5 Bridge Repairs, Columbia River, Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ...-AA00 Safety Zone; Interstate 5 Bridge Repairs, Columbia River, Portland, OR AGENCY: Coast Guard, DHS... waters of the Columbia River due to repairs being made to the Interstate 5 Bridge. The safety zone is... would be contrary to public interest since the repairs to the Interstate 5 Bridge would be completed by...

  7. Hybrid Discrete Element - Finite Element Simulation for Railway Bridge-Track Interaction

    NASA Astrophysics Data System (ADS)

    Kaewunruen, S.; Mirza, O.

    2017-10-01

    At the transition zone or sometimes called ‘bridge end’ or ‘bridge approach’, the stiffness difference between plain track and track over bridge often causes aggravated impact loading due to uneven train movement onto the area. The differential track settlement over the transition has been a classical problem in railway networks, especially for the aging rail infrastructures around the world. This problem is also additionally worsened by the fact that the construction practice over the area is difficult, resulting in a poor compaction of formation and subgrade. This paper presents an advanced hybrid simulation using coupled discrete elements and finite elements to investigate dynamic interaction at the transition zone. The goal is to evaluate the dynamic stresses and to better understand the impact dynamics redistribution at the bridge end. An existing bridge ‘Salt Pan Creek Railway Bridge’, located between Revesby and Kingsgrove, has been chosen for detailed investigation. The Salt Pan Bridge currently demonstrates crushing of the ballast causing significant deformation and damage. Thus, it’s imperative to assess the behaviours of the ballast under dynamic loads. This can be achieved by modelling the nonlinear interactions between the steel rail and sleeper, and sleeper to ballast. The continuum solid elements of track components have been modelled using finite element approach, while the granular media (i.e. ballast) have been simulated by discrete element method. The hybrid DE/FE model demonstrates that ballast experiences significant stresses at the contacts between the sleeper and concrete section. These overburden stress exists in the regions below the outer rails, identify fouling and permanent deformation of the ballast.

  8. 77 FR 66541 - Safety Zone; Alliance Road Bridge Demolition; Black Warrior River, Locust Fork; Birmingham, AL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... 1625-AA00 Safety Zone; Alliance Road Bridge Demolition; Black Warrior River, Locust Fork; Birmingham... of the Alliance Road Bridge (Co. Rd. 61). Entry into, transiting or anchoring in this zone is.... [[Page 66542

  9. 33 CFR 165.1187 - Security Zones; Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay, California. 165.1187 Section 165.1187... Limited Access Areas Eleventh Coast Guard District § 165.1187 Security Zones; Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay, California. (a) Location. All waters extending...

  10. 33 CFR 165.1187 - Security Zones; Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay, California. 165.1187 Section 165.1187... Limited Access Areas Eleventh Coast Guard District § 165.1187 Security Zones; Golden Gate Bridge and the San Francisco-Oakland Bay Bridge, San Francisco Bay, California. (a) Location. All waters extending...

  11. From "Exploring the Middle Zone" to "Constructing a Bridge": Experimenting in the Spiral "Bianshi" Mathematics Curriculum

    ERIC Educational Resources Information Center

    Wong, Ngai-Ying; Lam, Chi-Chung; Sun, XuHua; Chan, Anna Mei Yan

    2009-01-01

    The spiral bianshi curriculum, an improvement on bianshi teaching developed by Gu (2000) and in line with Marton's theory of variation (Marton & Booth, 1997), was tried out in a primary school in Hong Kong. This improved theoretical framework for the spiral bianshi curriculum comprises four types of bianshi problems--the inductive bianshi, the…

  12. 76 FR 53827 - Safety Zone; Big Sioux River From the Military Road Bridge North Sioux City to the Confluence of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-30

    ...-AA00 Safety Zone; Big Sioux River From the Military Road Bridge North Sioux City to the Confluence of... rule extends the existing temporary safety zone on the Big Sioux River from the Military Road Bridge in... period. SUMMARY: The Coast Guard is extending the effective period for the temporary safety zone...

  13. 76 FR 38011 - Safety Zone; Hylebos Bridge Restoration, Hylebos Waterway, Tacoma, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ...-AA00 Safety Zone; Hylebos Bridge Restoration, Hylebos Waterway, Tacoma, WA AGENCY: Coast Guard, DHS... extending 50 yards to the north and south of the Hylebos Bridge, Tacoma, WA in both directions along the entire length of the Hylebos Bridge to ensure the safety of the boating public during the Hylebos Bridge...

  14. 78 FR 61937 - Safety Zone; Port of Galveston, Pelican Island Bridge Repair

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-07

    ... Zone; Port of Galveston, Pelican Island Bridge Repair AGENCY: Coast Guard, DHS. ACTION: Temporary final... safety during the Pelican Island Bridge Repair Project. This action is necessary to protect public... barge will be placed under the Pelican Island Bridge; therefore immediate action is needed to protect...

  15. 75 FR 3372 - Safety Zone: Congress Street Bridge, Pequonnock River, Bridgeport, CT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ...-AA00 Safety Zone: Congress Street Bridge, Pequonnock River, Bridgeport, CT AGENCY: Coast Guard, DHS... waters surrounding the Congress Street Bridge over the Pequonnock River in Bridgeport, Connecticut. This... and equipment that are being utilized for partial demolition of the Congress Street Bridge. Entry into...

  16. Bridge pier foundation evaluation using cross-hole seismic tomographic imaging

    NASA Astrophysics Data System (ADS)

    Butchibabu, B.; Sandeep, N.; Sivaram, Y. V.; Jha, P. C.; Khan, P. K.

    2017-09-01

    An ambitious project connecting Jammu and Srinagar through a railway link in tectonically active and geologically complex Himalayan Mountain terrain is under progress. Under this project, the world's highest (359 m) railway arch-bridge is under construction across the River Chenab in the northern territory of India. This mega engineering structure has a two-fold ribbed arch design, comprising of steel girders. During the excavation for one of the concrete pillars on the right abutment, wide open joints and weak/shear zones were noticed. The width of these joints varies from 30 to 50 cm, trending along N170° with a dip of 65°. The foundation area of this pillar is 13 m × 24 m and on the cut slopes of the right bank of Chenab River. These exposed joints and weak zones were treated with consolidation grouting to strengthen the foundation area. To delineate the extent of these joints and weak zones below the foundation level, seismic tomography was carried out in five boreholes drilled for this purpose to cover the 300 sq-m area. The results of cross-hole seismic tomography reveals the presence of three low velocity (≤ 2600 m/s) anomalous zones below the foundation area. This also ascertained the efficacy of grouting in consolidating the joints and weak zones. Later, rock-mass quality (Q) was determined based on the relationship between the P-wave velocity and the Q-value (Barton, 2002) to infer the support system for the slope stabilization below the foundation. 3-D visualization of the seismic velocity demarcates the extent of weak or untreated zones. This methodology facilitates to update the design parameters according to Q-values during the construction stage and estimate the required level of reinforcement and support system. Similar methodology can be applicable in other areas under same site conditions.

  17. 77 FR 63732 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the Demolition Project on the Cline Avenue Bridge... vessels from the hazards associated with the demolition project on the Cline Avenue bridge, which are...

  18. 77 FR 72957 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the demolition Project on the Cline Avenue Bridge... associated with the demolition project on the Cline Avenue bridge, which are discussed further below. Under 5...

  19. 77 FR 21436 - Safety Zone, East River, Brooklyn Bridge Scaffolding Repair, Brooklyn, NY

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-10

    ...-AA00 Safety Zone, East River, Brooklyn Bridge Scaffolding Repair, Brooklyn, NY AGENCY: Coast Guard, DHS... navigable waters of the East River, in the vicinity of the Brooklyn Bridge. This action is necessary to... and remove the damaged scaffolding under the eastern span of the bridge. This rule is intended to...

  20. 77 FR 70684 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the demolition Project on the Cline Avenue Bridge... bridge, which are discussed further below. Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good...

  1. 78 FR 2616 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-14

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the demolition Project on the Cline Avenue Bridge... Bridge, which are discussed further below. Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good...

  2. 77 FR 65818 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the Demolition Project on the Cline Avenue Bridge... demolition project on the Cline Avenue Bridge, which are discussed further below. Under 5 U.S.C. 553(d)(3...

  3. A novel abutment construction technique for rapid bridge construction : controlled low strength Materials (CLSM) with full-height concrete panels.

    DOT National Transportation Integrated Search

    2012-01-01

    One of the major obstacles facing rapid bridge construction for typical span type bridges is the time required to construct bridge abutments and foundations. This can be remedied by using the controlled low strength materials (CLSM) bridge abutment. ...

  4. Geometry control of long-span continuous girder concrete bridge during construction through finite element model updating

    NASA Astrophysics Data System (ADS)

    Wu, Jie; Yan, Quan-sheng; Li, Jian; Hu, Min-yi

    2016-04-01

    In bridge construction, geometry control is critical to ensure that the final constructed bridge has the consistent shape as design. A common method is by predicting the deflections of the bridge during each construction phase through the associated finite element models. Therefore, the cambers of the bridge during different construction phases can be determined beforehand. These finite element models are mostly based on the design drawings and nominal material properties. However, the accuracy of these bridge models can be large due to significant uncertainties of the actual properties of the materials used in construction. Therefore, the predicted cambers may not be accurate to ensure agreement of bridge geometry with design, especially for long-span bridges. In this paper, an improved geometry control method is described, which incorporates finite element (FE) model updating during the construction process based on measured bridge deflections. A method based on the Kriging model and Latin hypercube sampling is proposed to perform the FE model updating due to its simplicity and efficiency. The proposed method has been applied to a long-span continuous girder concrete bridge during its construction. Results show that the method is effective in reducing construction error and ensuring the accuracy of the geometry of the final constructed bridge.

  5. Phase and widening construction of steel bridges : [summary].

    DOT National Transportation Integrated Search

    2014-03-01

    Maintaining traffic flow for bridge widening and replacement projects often requires bridges to be constructed in phases so that traffic can travel on one : portion of the bridge while another portion is being : constructed. The bridge portions are t...

  6. Structural strength deterioration of coastal bridge piers considering non-uniform corrosion in marine environments

    NASA Astrophysics Data System (ADS)

    Guo, Anxin; Yuan, Wenting; Li, Haitao; Li, Hui

    2018-04-01

    In the aggressive marine environment over a long-term service period, coastal bridges inevitably sustain corrosion-induced damage due to high sea salt and humidity. This paper investigates the strength reduction of coastal bridges, especially focusing on the effects of non-uniform corrosion along the height of bridge piers. First, the corrosion initiation time and the degradation of reinforcement and concrete are analyzed for bridge piers in marine environments. To investigate the various damage modes of the concrete cover, a discretization method with fiber cells is used for calculating time-dependent interaction diagrams of cross-sections of the bridge piers at the atmospheric zone and the splash and tidal zone under a combination of axial force and bending moment. Second, the shear strength of these aging structures is analyzed. Numerical simulation indicates that the strength of a concrete pier experiences dramatic reduction from corrosion initiation to the spalling of the concrete cover. Strength loss in the splash and tidal zone is more significant than in the atmospheric zone when structures' service time is assumed to be the same.

  7. Construction Simulation Analysis of 60m-span Concrete Filled Steel Tube arch bridge

    NASA Astrophysics Data System (ADS)

    Shi, Jing Xian; Ding, Qing Hua

    2018-06-01

    The construction process of the CFST arch bridge is complicated. The construction process not only affects the structural stress in the installation, but also determines the form a bridge and internal force of the bridge. In this paper, a 60m span concrete filled steel tube tied arch bridge is taken as the background, and a three-dimensional finite element simulation model is established by using the MIDAS/Civil bridge structure analysis software. The elevation of the main arch ring, the beam stress, the forces in hanger rods and the modal frequency of the main arch during the construction stage are calculated, and the construction process is simulated and analyzed. Effectively and reasonably guide the construction and ensure that the line and force conditions of the completed bridge meet the design requirements and provides a reliable technical guarantee for the safe construction of the bridge.

  8. Implementation guidance for accelerated bridge construction in South Dakota

    DOT National Transportation Integrated Search

    2017-09-01

    A study was conducted to investigate implementation of accelerated bridge construction (ABC) in South Dakota. Accelerated bridge construction is defined as construction practices that employ innovative techniques to reduce on-site construction time a...

  9. 33 CFR 115.60 - Procedures for handling applications for bridge construction permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... applications for bridge construction permits. 115.60 Section 115.60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.60 Procedures for handling applications for bridge construction permits. The following procedures will be...

  10. 33 CFR 115.60 - Procedures for handling applications for bridge construction permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... applications for bridge construction permits. 115.60 Section 115.60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.60 Procedures for handling applications for bridge construction permits. The following procedures will be...

  11. 33 CFR 165.1110 - Security Zone: Coronado Bay Bridge, San Diego, CA.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Bridge, San Diego, CA. 165.1110 Section 165.1110 Navigation and Navigable Waters COAST GUARD, DEPARTMENT... § 165.1110 Security Zone: Coronado Bay Bridge, San Diego, CA. (a) Location. All navigable waters of San Diego Bay, from the surface to the sea floor, within 25 yards of all piers, abutments, fenders and...

  12. 33 CFR 165.1110 - Security Zone: Coronado Bay Bridge, San Diego, CA.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Bridge, San Diego, CA. 165.1110 Section 165.1110 Navigation and Navigable Waters COAST GUARD, DEPARTMENT... § 165.1110 Security Zone: Coronado Bay Bridge, San Diego, CA. (a) Location. All navigable waters of San Diego Bay, from the surface to the sea floor, within 25 yards of all piers, abutments, fenders and...

  13. 33 CFR 165.1110 - Security Zone: Coronado Bay Bridge, San Diego, CA.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Bridge, San Diego, CA. 165.1110 Section 165.1110 Navigation and Navigable Waters COAST GUARD, DEPARTMENT... § 165.1110 Security Zone: Coronado Bay Bridge, San Diego, CA. (a) Location. All navigable waters of San Diego Bay, from the surface to the sea floor, within 25 yards of all piers, abutments, fenders and...

  14. Research on evaluation and standardization of accelerated bridge construction techniques, part II.

    DOT National Transportation Integrated Search

    2015-09-01

    The Michigan Department of Transportation (MDOT) uses Accelerated bridge construction : (ABC) to reduce delays and minimize construction impacts. MDOT contracted and completed : several bridges using prefabricated bridge elements and systems (PBES). ...

  15. Research on evaluation and standardization of accelerated bridge construction techniques, part I.

    DOT National Transportation Integrated Search

    2015-09-01

    The Michigan Department of Transportation (MDOT) uses Accelerated bridge construction : (ABC) to reduce delays and minimize construction impacts. MDOT contracted and completed : several bridges using prefabricated bridge elements and systems (PBES). ...

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Park, Kyoungsoo, E-mail: kpark16@illinois.ed; Paulino, Glaucio H.; Roesler, Jeffery

    A simple, effective, and practical constitutive model for cohesive fracture of fiber reinforced concrete is proposed by differentiating the aggregate bridging zone and the fiber bridging zone. The aggregate bridging zone is related to the total fracture energy of plain concrete, while the fiber bridging zone is associated with the difference between the total fracture energy of fiber reinforced concrete and the total fracture energy of plain concrete. The cohesive fracture model is defined by experimental fracture parameters, which are obtained through three-point bending and split tensile tests. As expected, the model describes fracture behavior of plain concrete beams. Inmore » addition, it predicts the fracture behavior of either fiber reinforced concrete beams or a combination of plain and fiber reinforced concrete functionally layered in a single beam specimen. The validated model is also applied to investigate continuously, functionally graded fiber reinforced concrete composites.« less

  17. Precast concrete elements for accelerated bridge construction : laboratory testing, field testing, evaluation of a precast concrete bridge, Madison County bridge.

    DOT National Transportation Integrated Search

    2009-01-01

    The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa : DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed ...

  18. Myofilament dysfunction contributes to impaired myocardial contraction in the infarct border zone

    PubMed Central

    Shimkunas, Rafael; Makwana, Om; Spaulding, Kimberly; Bazargan, Mona; Khazalpour, Michael; Takaba, Kiyoaki; Soleimani, Mehrdad; Myagmar, Bat-Erdene; Lovett, David H.; Simpson, Paul C.; Ratcliffe, Mark B.

    2014-01-01

    After myocardial infarction, a poorly contracting nonischemic border zone forms adjacent to the infarct. The cause of border zone dysfunction is unclear. The goal of this study was to determine the myofilament mechanisms involved in postinfarction border zone dysfunction. Two weeks after anteroapical infarction of sheep hearts, we studied in vitro isometric and isotonic contractions of demembranated myocardium from the infarct border zone and a zone remote from the infarct. Maximal force development (Fmax) of the border zone myocardium was reduced by 31 ± 2% versus the remote zone myocardium (n = 6/group, P < 0.0001). Decreased border zone Fmax was not due to a reduced content of contractile material, as assessed histologically, and from myosin content. Furthermore, decreased border zone Fmax did not involve altered cross-bridge kinetics, as assessed by muscle shortening velocity and force development kinetics. Decreased border zone Fmax was associated with decreased cross-bridge formation, as assessed from muscle stiffness in the absence of ATP where cross-bridge formation should be maximized (rigor stiffness was reduced 34 ± 6%, n = 5, P = 0.011 vs. the remote zone). Furthermore, the border zone myocardium had significantly reduced phosphorylation of myosin essential light chain (ELC; 41 ± 10%, n = 4, P < 0.05). However, for animals treated with doxycycline, an inhibitor of matrix metalloproteinases, rigor stiffness and ELC phosphorylation were not reduced in the border zone myocardium, suggesting that doxycycline had a protective effect. In conclusion, myofilament dysfunction contributes to postinfarction border zone dysfunction, myofilament dysfunction involves impaired cross-bridge formation and decreased ELC phosphorylation, and matrix metalloproteinase inhibition may be beneficial for limiting postinfarct border zone dysfunction. PMID:25128171

  19. 33 CFR 165.T08-0433 - Safety Zone; Waterway Closure, Atchafalaya River from Mile Marker 117 (Morgan City Railroad...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., Atchafalaya River from Mile Marker 117 (Morgan City Railroad Bridge) to Mile Marker 0 (Simmesport, LA). 165... Safety Zone; Waterway Closure, Atchafalaya River from Mile Marker 117 (Morgan City Railroad Bridge) to... waters of the Atchafalaya River between MM 117 (Morgan City Railroad Bridge) and MM 0 (Simmesport, LA...

  20. Evaluation of the Buena Vista IBRD bridge : a furthering of accelerated bridge construction in Iowa.

    DOT National Transportation Integrated Search

    2012-02-01

    The need to construct bridges that last longer, are less expensive, and take less time to build has increased. The importance of accelerated bridge construction (ABC) technologies has been realized by the Federal Highway Administration (FHWA) and the...

  1. 19 CFR 123.18 - Equipment and materials for constructing bridges or tunnels between the United States and Canada...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 1 2011-04-01 2011-04-01 false Equipment and materials for constructing bridges... WITH CANADA AND MEXICO International Traffic § 123.18 Equipment and materials for constructing bridges.... Equipment for use in construction of bridges or tunnels between the United States and Canada or Mexico shall...

  2. Research notes : polymer concrete bridge deck overlays : Deschutes River Bridge (Biggs), Maupin Bridge (Maupin) : final report.

    DOT National Transportation Integrated Search

    1995-07-01

    This report documents the construction and performance of two thin polymer concrete (with polyester/styrene resins) bridge deck overlays. The overlays were constructed in Biggs and Maupin, Oregon in June 1993. Construction of the overlays was less th...

  3. 78 FR 75899 - Safety Zone; 2013 Holiday Boat Parades, Captain of the Port Miami Zone; FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-13

    ... Bridge in Jupiter, Florida. A special local regulation was previously promulgated at 33 CFR 100.701... and end at Loxahatchee River Daymarker 7, east of the Glynn Mayo Highway Bridge in Jupiter, Florida...

  4. Accelerated bridge construction utilizing precast pier caps on state highway 69 over Turkey Creek, Huerfano County, CO.

    DOT National Transportation Integrated Search

    2014-07-01

    The purpose of this report is to document Accelerated Bridge Construction (ABC) techniques on IBRD : (Innovative Bridge Research and Development) project 102470 for the construction of Bridge N-16-Q : on State Highway 69 over Turkey Creek. The constr...

  5. Preservation treatment for wood bridge application

    Treesearch

    Jake Bigelow; Stan Lebow; Carol A. Clausen; Lowell Greimann; Terry J. Wipf

    2009-01-01

    Timber can often be a cost-effective construction material for new bridges. The durability of the bridge greatly depends on proper attention to construction details and fabrication, as well as proper preservative treatment before, during, and after construction. Material repair and replacement costs for bridges are a considerable expense for highway agencies. To...

  6. 76 FR 42545 - Regulated Navigation Area; Chelsea Street Bridge Construction, Chelsea, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ...-AA11 Regulated Navigation Area; Chelsea Street Bridge Construction, Chelsea, MA AGENCY: Coast Guard... and surrounding the Chelsea Street Bridge (CSB) that crosses the Chelsea River between East Boston and... navigable waters during the construction of the Chelsea Street Bridge. DATES: This rule is effective in the...

  7. 76 FR 65376 - Regulated Navigation Area; Chelsea Street Bridge Construction, Chelsea, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-21

    ...-AA11 Regulated Navigation Area; Chelsea Street Bridge Construction, Chelsea, MA AGENCY: Coast Guard... Area (RNA) on the navigable waters of the Chelsea River under and surrounding the Chelsea Street Bridge... opportunity for public questions or comments, during the bridge construction. We will provide written...

  8. 75 FR 38923 - Regulated Navigation Area: Niantic Railroad Bridge Construction, Niantic, CT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-07

    ...-AA11 Regulated Navigation Area: Niantic Railroad Bridge Construction, Niantic, CT AGENCY: Coast Guard... Niantic River Channel under and surrounding the Amtrak Railroad Bridge that crosses Niantic Bay in the... on the navigable waters during the construction of the Niantic Railroad Bridge. DATES: This rule is...

  9. Elkmont Vehicle Bridge, Construction PeelAway Great Smoky Mountains National ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Elkmont Vehicle Bridge, Construction Peel-Away - Great Smoky Mountains National Park Roads & Bridges, Elkmont Vehicle Bridge, Spanning Little River at Elkmont Campground, Gatlinburg, Sevier County, TN

  10. Finite Element Analysis and Biomechanical Comparison of Short Posterior Spinal Instrumentation with Divergent Bridge Construct versus Parallel Tension Band Construct for Thoracolumbar Spine Fractures

    PubMed Central

    Ouellet, Jean A.; Richards, Corey; Sardar, Zeeshan M.; Giannitsios, Demetri; Noiseux, Nicholas; Strydom, Willem S.; Reindl, Rudy; Jarzem, Peter; Arlet, Vincent; Steffen, Thomas

    2013-01-01

    The ideal treatment for unstable thoracolumbar fractures remains controversial with posterior reduction and stabilization, anterior reduction and stabilization, combined posterior and anterior reduction and stabilization, and even nonoperative management advocated. Short segment posterior osteosynthesis of these fractures has less comorbidities compared with the other operative approaches but settles into kyphosis over time. Biomechanical comparison of the divergent bridge construct versus the parallel tension band construct was performed for anteriorly destabilized T11–L1 spine segments using three different models: (1) finite element analysis (FEA), (2) a synthetic model, and (3) a human cadaveric model. Outcomes measured were construct stiffness and ultimate failure load. Our objective was to determine if the divergent pedicle screw bridge construct would provide more resistance to kyphotic deforming forces. All three modalities showed greater stiffness with the divergent bridge construct. The FEA calculated a stiffness of 21.6 N/m for the tension band construct versus 34.1 N/m for the divergent bridge construct. The synthetic model resulted in a mean stiffness of 17.3 N/m for parallel tension band versus 20.6 N/m for the divergent bridge (p = 0.03), whereas the cadaveric model had an average stiffness of 15.2 N/m in the parallel tension band compared with 18.4 N/m for the divergent bridge (p = 0.02). Ultimate failure load with the cadaveric model was found to be 622 N for the divergent bridge construct versus 419 N (p = 0.15) for the parallel tension band construct. This study confirms our clinical experience that the short posterior divergent bridge construct provides greater stiffness for the management of unstable thoracolumbar fractures. PMID:24436856

  11. Laboratory and field testing of an accelerated bridge construction demonstration bridge : US Highway 6 bridge over Keg Creek.

    DOT National Transportation Integrated Search

    2013-04-01

    The US Highway 6 Bridge over Keg Creek outside of Council Bluffs, Iowa is a demonstration bridge site chosen to put into practice : newly-developed Accelerated Bridge Construction (ABC) concepts. One of these new concepts is the use of prefabricated ...

  12. Field performance of timber bridges. 7, Connell Lake stress-laminated deck bridge

    Treesearch

    L. E. Hislop; M. A. Ritter

    The Connell Lake bridge was constructed in early 1991 on the Tongass National Forest, Alaska, as a demonstration bridge under the Timber Bridge Initiative. The bridge is a stress-laminated deck structure with an approximate 36-ft length and 18-ft width and is the first known stress-laminated timber bridge constructed in Alaska. Performance of the bridge was monitored...

  13. 77 FR 14276 - Regulated Navigation Area; Little Bay Bridge Construction, Little Bay, Portsmouth, NH

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ...-AA11 Regulated Navigation Area; Little Bay Bridge Construction, Little Bay, Portsmouth, NH AGENCY... under and surrounding the Little Bay and General Sullivan Bridges in order to facilitate construction of the Little Bay Bridge between Newington, NH and Dover, NH. This temporary interim rule is necessary to...

  14. 76 FR 57910 - Regulated Navigation Area; Route 24 Bridge Construction, Tiverton and Portsmouth, RI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-19

    ...-AA11 Regulated Navigation Area; Route 24 Bridge Construction, Tiverton and Portsmouth, RI AGENCY: Coast... surrounding construction of the new Route 24 bridge that crosses the Sakonnet River between Tiverton and... channel beneath the bridge, speed restrictions, and suspension of all vessel traffic within the RNA during...

  15. Effects of bridge construction on songbirds and small mammals at Blennerhassett Island, Ohio River, USA.

    PubMed

    Vance, Joshua A; Angus, Norse B; Anderson, James T

    2013-09-01

    Construction of man-made objects such as roads and bridges may have impacts on wildlife depending on species or location. We investigated songbirds and small mammals along the Ohio River, WV, USA at a new bridge both before and after construction and at a bridge crossing that was present throughout the study. Comparisons were made at each site over three time periods (1985-1987 [Phase I] and 1998-2000 [Phase II] [pre-construction], 2007-2009 [Phase III] [post-construction]) and at three distances (0, 100, 300 m) from the bridge or proposed bridge location. Overall, 70 songbirds and 10 small mammals were detected during the study. Cliff swallows (Petrochelidon pyrrhonota) and rock pigeons (Columba livia) showed high affinity for bridges (P < 0.05). Combined small mammal abundances increased between Phases I and II (P < 0.05), but did not differ between Phases II and III (P > 0.05). Species richness and diversity for songbirds and small mammals did not differ before and after bridge construction (P > 0.05). We found that most species sampled did not respond to the bridge crossing, and believe that the bridge is not causing any measurable negative density impacts to the species we investigated. The new bridge does provide habitat for exotic rock pigeons that are adjusted to man-made structures for nesting.

  16. Seismic response of precast segmental bridge superstructures.

    DOT National Transportation Integrated Search

    2006-12-01

    Precast segmental construction of bridges can accelerate construction and minimize the cost of bridges in highly congested urban environments and environmentally sensitive regions. Despite their proven benefits, the use of precast segmental bridges i...

  17. 35. BRIDGE, CONSTRUCTION MISSISSIPPI, LOWNDES CO. COLUMBUS End of Main ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. BRIDGE, CONSTRUCTION MISSISSIPPI, LOWNDES CO. COLUMBUS End of Main St., Columbus Bridge under construction, 1925-27. Photo from S side of W approach. Credit: Shenks Photography, Columbus, Ms, owner. O. Pruitt, photographer, ca. 1927. Copied by Sarcone Photography, columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Columbus, Lowndes County, MS

  18. 12. Photocopy of bridge construction phonograph (from the collection of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photocopy of bridge construction phonograph (from the collection of Phil Bolmie, 17540 County Road 28, Colfax, North Dakota 58018; 701 553-8705) photographer unknown, 1917 views showing bridge under construction - Enloe Bridge No. 90021, Spanning Red River of North between Minnesota & North Dakota on County State Aid Highway 28, Wolverton, Wilkin County, MN

  19. 76 FR 55160 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-06

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...

  20. 77 FR 53251 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...

  1. 75 FR 62181 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-07

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...

  2. Implementation Guidance for Accelerated Bridge Construction in South Dakota : Research Brief

    DOT National Transportation Integrated Search

    2017-09-01

    Investigate typical accelerated bridge construction methods and their applicability in South Dakota. A study was conducted to investigate the implementation of accelerated bridge construction (ABC) in South Dakota. The main objective of this study wa...

  3. SSI-bridge : soil bridge interaction during long-duration earthquake motions.

    DOT National Transportation Integrated Search

    2014-09-01

    The seismic response of a complete soil-bridge system during shallow, crustal and subduction zone earthquakes is the topic of this report. Specifically, the effects of earthquake duration on the seismic performance of soil-bridge systems are examined...

  4. Effect of voids in grouted post-tensioned concrete bridge construction : inspection and repair manual for external tendons in segmental, post-tensioned bridges.

    DOT National Transportation Integrated Search

    2009-11-01

    Segmental, post-tensioned (PT) bridges are major structures that carry significant traffic. These bridges are designed and constructed because they are economical for spanning long distances. In Texas, there are several signature PT bridges. In the l...

  5. Bridge deck fogging system : evaluation of field implementation of a fogging system used during bridge deck construction.

    DOT National Transportation Integrated Search

    2008-01-01

    The objective of this research was to implement and evaluate a fogging system used to provide initial cure for a concrete bridge deck construction project. To accomplish this, Bridges 5500 and 5701 along NM26 were selected. Bridge 5500 was placed usi...

  6. 19 CFR 123.18 - Equipment and materials for constructing bridges or tunnels between the United States and Canada...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Equipment and materials for constructing bridges... bridges or tunnels between the United States and Canada or Mexico. (a) Admission of equipment and materials. Equipment for use in construction of bridges or tunnels between the United States and Canada or...

  7. Implementation of sustainability in bridge design, construction and maintenance.

    DOT National Transportation Integrated Search

    2012-12-01

    The focus of this research is to develop a framework for more sustainable design and construction : processes for new bridges, and sustainable maintenance practices for existing bridges. The framework : includes a green rating system for bridges. The...

  8. Analysis of the state of the art of precast concrete bridge substructure systems.

    DOT National Transportation Integrated Search

    2013-10-01

    Precasting of bridge substructure components holds potential for accelerating the construction of bridges,reducing : impacts to the traveling public on routes adjacent to construction sites, improving bridge durability and hence service : life, and r...

  9. Faster bridge construction using precast substructures : brief.

    DOT National Transportation Integrated Search

    2011-07-01

    Bridge replacement often requires road closures and detours that frustrate road users. It remains a key goal of Wisconsin DOT to reduce construction-related road use interruptions. This will be a challenge with bridges: Bridge inspections in 2007 ide...

  10. Field performance of timber bridges. 6, Hoffman Run stress-laminated deck bridge

    Treesearch

    M. A. Ritter; P. D. Hilbrich Lee; G. J. Porter

    The Hoffman Run bridge, located just outside Dahoga, Pennsylvania, was constructed in October 1990. The bridge is a simple-span, single-lane, stress-laminated deck superstructure that is approximately 26 ft long and 16 ft wide. It is the second stress-laminated timber bridge to be constructed of hardwood lumber in Pennsylvania. The performance of the bridge was...

  11. Study on Construction Technology of Municipal Road and Bridge Concrete

    NASA Astrophysics Data System (ADS)

    Tang, Fuyong

    2018-03-01

    With the continuous development of social economy and the accelerating process of urbanization, municipal road and bridge projects have also shown a trend of rapid development. Municipal road and bridge work can fully reflect the economic and cultural development level of cities and is also an important symbol of urban development. As a basic material of construction, concrete is widely used in engineering construction. This article will analyze the municipal road and bridge concrete construction technology, put forward corresponding measures.

  12. Construction of a Virginia short-span bridge with the Strongwell 36-inch double-web I-beam.

    DOT National Transportation Integrated Search

    2005-01-01

    The Route 601 Bridge in Sugar Grove, VA, spans 39 ft over Dickey Creek. The bridge is the first to use the Strongwell 36-in-deep fiber-reinforced polymer (FRP) double-web beam (DWB) in a vehicular bridge superstructure. Construction of the new bridge...

  13. Implementation of sustainable and green design and construction practices for bridges.

    DOT National Transportation Integrated Search

    2012-12-01

    The focus of this research is to develop a framework for more sustainable design and construction : processes for new bridges, and sustainable maintenance practices for existing bridges. The framework : includes a green rating system for bridges. The...

  14. Finite element analysis of the Wolf Creek multispan curved girder bridge.

    DOT National Transportation Integrated Search

    2008-01-01

    The use of curved girder bridges in highway construction has grown steadily during the last 40 years. Today, roughly 25% of newly constructed bridges have a curved alignment. Curved girder bridges have numerous complicating geometric features that di...

  15. Design, construction, and field testing of an ultra high performance concrete pi-girder bridge.

    DOT National Transportation Integrated Search

    2011-01-01

    The Jakway Park Bridge in Buchanan County, Iowa is the first bridge constructed with a new prestesssed girder system composed of : precast Ultra-High Performance Concrete (UHPC). These girders employ an integral deck to facilitate construction and ar...

  16. Wind Tunnel Measurements for Flutter of a Long-Afterbody Bridge Deck

    PubMed Central

    Chen, Zeng-Shun; Zhang, Cheng; Wang, Xu; Ma, Cun-Ming

    2017-01-01

    Bridges are an important component of transportation. Flutter is a self-excited, large amplitude vibration, which may lead to collapse of bridges. It must be understood and avoided. This paper takes the Jianghai Channel Bridge, which is a significant part of the Hong Kong-Zhuhai-Macao Bridge, as an example to investigate the flutter of the bridge deck. Firstly, aerodynamic force models for flutter of bridges were introduced. Then, wind tunnel tests of the bridge deck during the construction and the operation stages, under different wind attack angles and wind velocities, were carried out using a high frequency base balance (HFBB) system and laser displacement sensors. From the tests, the static aerodynamic forces and flutter derivatives of the bridge deck were observed. Correspondingly, the critical flutter wind speeds of the bridge deck were determined based on the derivatives, and they are compared with the directly measured flutter speeds. Results show that the observed derivatives are reasonable and applicable. Furthermore, the critical wind speeds in the operation stage is smaller than those in the construction stage. Besides, the flutter instabilities of the bridge in the construction and the operation stages are good. This study helps guarantee the design and the construction of the Jianghai Channel Bridge, and advances the understanding of flutter of long afterbody bridge decks. PMID:28208773

  17. Wind Tunnel Measurements for Flutter of a Long-Afterbody Bridge Deck.

    PubMed

    Chen, Zeng-Shun; Zhang, Cheng; Wang, Xu; Ma, Cun-Ming

    2017-02-09

    Bridges are an important component of transportation. Flutter is a self-excited, large amplitude vibration, which may lead to collapse of bridges. It must be understood and avoided. This paper takes the Jianghai Channel Bridge, which is a significant part of the Hong Kong-Zhuhai-Macao Bridge, as an example to investigate the flutter of the bridge deck. Firstly, aerodynamic force models for flutter of bridges were introduced. Then, wind tunnel tests of the bridge deck during the construction and the operation stages, under different wind attack angles and wind velocities, were carried out using a high frequency base balance (HFBB) system and laser displacement sensors. From the tests, the static aerodynamic forces and flutter derivatives of the bridge deck were observed. Correspondingly, the critical flutter wind speeds of the bridge deck were determined based on the derivatives, and they are compared with the directly measured flutter speeds. Results show that the observed derivatives are reasonable and applicable. Furthermore, the critical wind speeds in the operation stage is smaller than those in the construction stage. Besides, the flutter instabilities of the bridge in the construction and the operation stages are good. This study helps guarantee the design and the construction of the Jianghai Channel Bridge, and advances the understanding of flutter of long afterbody bridge decks.

  18. Fatigue Crack Growth and Crack Bridging in SCS-6/Ti-24-11

    NASA Technical Reports Server (NTRS)

    Ghosn, Louis J.; Kantzos, Pete; Telesman, Jack

    1995-01-01

    Interfacial damage induced by relative fiber/matrix sliding was found to occur in the bridged zone of unidirectional SCS-6/Ti-24Al-11Nb intermetallic matrix composite specimens subjected to fatigue crack growth conditions. The degree of interfacial damage was not uniform along the bridged crack wake. Higher damage zones were observed near the machined notch in comparison to the crack tip. The interfacial friction shear strength tau(sub f) measured in the crack wake using pushout testing revealed lower values than the as-received interface. Interfacial wear also reduced the strength of the bridging fibers. The reduction in fiber strength is thought to be a function of the magnitude of relative fiber/matrix displacements ind the degree of interfacial damage. Furthermore, two different fiber bridging models were used to predict the influence of bridging on the fatigue crack driving force. The shear lag model required a variable tau(sub f) in the crack wake (reflecting the degradation of the interface) before its predictions agreed with trends exhibited by the experimental data. The fiber pressure model did an excellent job in predicting both the FCG data and the DeltaCOD in the bridged zone even though it does not require a knowledge of tau(sub f).

  19. Field performance of timber bridges. 5, Little Salmon Creek stress-laminated deck bridge

    Treesearch

    M. A. Ritter; J. A. Kainz; G. J. Porter

    The Little Salmon Creek bridge was constructed in November 1988 on the Allegheny National Forest in Pennsylvania. The bridge is a simple span, single-lane, stress-laminated deck superstructure that is approximately 26-ft long and 16-ft wide. The bridge is unique in that it is the first known stress-laminated timber bridge to be constructed of hardwood lumber. The...

  20. Polymer concrete bridge deck overlays : Deschutes River Bridge (Biggs) and Maupin Bridge (Maupin) : final report.

    DOT National Transportation Integrated Search

    1995-07-01

    This report documents the construction and performance of two thin polymer concrete (with polyester/styrene resins) bridge deck overlays. The overlays were constructed in Biggs and Maupin, Oregon in June 1993. : Several problems were encountered duri...

  1. Development of a precast bridge deck overhang system for the rock creek bridge.

    DOT National Transportation Integrated Search

    2008-12-01

    Precast, prestressed panels are commonly used at interior beams for bridges in Texas. The use of these : panels provides ease of construction, sufficient capacity, and good economy for the construction of : bridges in Texas. Current practice for the ...

  2. Effect of voids in grouted, post-tensioned concrete bridge construction : seminar slides.

    DOT National Transportation Integrated Search

    2009-02-26

    Post-tensioned (PT) bridges have several advantages over other bridge types: they can span longer distances, can be constructed relatively fast, and are economical. The tendons of PT bridges are critical components, essentially the backbone of the PT...

  3. Monitoring calculation of closure change of Extradosed Cable-stayed Bridge

    NASA Astrophysics Data System (ADS)

    Shi, Jing Xian; Ran, Zhi Hong

    2018-06-01

    During the construction of extradosed cable-stayed bridge in Yunnan province, China, the construction unit has made certain changes in the construction process of the closure section due to environmental restrictions: remove the hanging basket after the closure, the sling shall not be provided in closure section, the function of the sling is realized by the hanging basket on the 16th beam. In case of this change, the bridge has been constructed to section 15th. In order to ensure the smooth and orderly progress of each stage in the closure phase, this article is arranged according to the construction plan, appropriate adjustment of related procedures, checking the bridge safety at all stages of construction, the stress and force of the main girder are compared to ensure the safety of the construction after closure changes. Adjust the height of the beam of the 16th and 17th to adapt the new construction plan, and the bridge closure smoothly.

  4. 77 FR 64722 - Safety Zone: Leukemia & Lymphoma Light the Night Walk Fireworks Display; Willamette River...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... 1625-AA00 Safety Zone: Leukemia & Lymphoma Light the Night Walk Fireworks Display; Willamette River... Steele Bridge and the Burnside Bridge, and will be enforced during the Leukemia & Lymphoma Light the... Light the Night Walk Fireworks Display; Willamette River, Portland, OR. (a) Location. The following area...

  5. 78 FR 17097 - Safety Zone; Lake Havasu Triathlon; Lake Havasu City, AZ

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-20

    ...-AA00 Safety Zone; Lake Havasu Triathlon; Lake Havasu City, AZ AGENCY: Coast Guard, DHS. ACTION... waters of Lake Havasu and the London Bridge Channel for the Lake Havasu Triathlon. This temporary safety... participants. The waterside swim course consists of 1500 meters in Lake Havasu and the London Bridge Channel...

  6. Experimental study on spatio-temporal behavior of a single particle forming a particle accumulation structure (PAS) in half-zone liquid bridge

    NASA Astrophysics Data System (ADS)

    Oba, Takeru; Ueno, Ichiro; Kaneko, Toshihiro

    2017-11-01

    We focus on particle behavior due to thermocapillary-driven convection in a half-zone liquid bridge of high-Prandtl number fluid. It has been known that the suspended particles exhibit a unique solid-like structure known as 'particle accumulation structure (PAS)' in a rotating frame of reference with traveling-type hydrothermal wave. It is said that PAS is caused by interaction between particles and the free surface of a half-zone liquid bridge. Such structures arise even under small Stokes number conditions. When observing PAS two-dimensionally, it looks like a closed single string, but the actual movement of particles is different. Therefore we employ three-dimensional particle tracking velocimetry to the half-zone liquid bridge of 2.5 mm in radius and 1.7 mm in height, and detect the particle behaviors close to the free surface. We explain the spatio-temporal correlation between the solid-like global structure of PAS and the local particle motions, and make comparisons with proposed physical models of PAS formation.

  7. UNIDENTIFIED CATENARY SUSPENSION BRIDGE, SHOWING RIVETED METAL PIERS UNDER CONSTRUCTION. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    UNIDENTIFIED CATENARY SUSPENSION BRIDGE, SHOWING RIVETED METAL PIERS UNDER CONSTRUCTION. NOTE APPROACH SPANS OF PIPE CONSTRUCTION IN RIGHT BACKGROUND. 3/4 VIEW FROM BELOW. - Clear Fork of Brazos River Suspension Bridge, Spanning Clear Fork of Brazos River at County Route 179, Albany, Shackelford County, TX

  8. Research on Swivel Construction Technology of 22,400 Tons in Zoucheng Thirty Meter Bridge

    NASA Astrophysics Data System (ADS)

    Han, Jun; Benlin, Xiao

    2018-05-01

    In recent years, with the rapid development of highways and railways in our country, there have been many new bridges that need to cross the existing routes. If the conventional construction methods are used, the existing traffic will be affected and the traffic will be built above the busy traffic lines, so there is a big security risk, the construction methods must be improved and innovated. In this paper, it intends to research and develop some key technologies of swivel construction. According to the construction features to use finite element method of swivel cable-stayed bridge to analyse the cable-stayed bridge . The swivel construction process is carried out to solve the technical problems and difficulties in the construction.

  9. Field performance of timber bridges. 14, Dean, Hibbsville, and Decatur stress-laminated deck bridges

    Treesearch

    P. D. Hilbrich Lee; M. A. Ritter; S. Golston; K. Hinds

    1984-01-01

    The Dean, Hibbsville, and Decatur bridges were constructed in southern Iowa during 1994. Each bridge is a simple-span, stress-laminated deck superstructure, approximately 7.3 m (24 ft) long, constructed from eastern cottonwood lumber. The performance of each bridge was monitored for approximately 2 years, beginning shortly after installation. Monitoring involved...

  10. Laboratory testing and finite element modeling of precast bridge deck panel transverse connections.

    DOT National Transportation Integrated Search

    2010-08-06

    Precast bridge deck panels are increasingly used to reduce construction times and associated traffic delays as part of many DOTs push for accelerated bridge construction. They allow a bridge deck to be built or replaced in days instead of months. ...

  11. M324 : investigation of closure pour elimination for phased construction of steel girder bridges.

    DOT National Transportation Integrated Search

    2014-10-01

    Phased construction is a common practice used by State DOTs during the : replacement of a bridge. This method allows for the traffic flow to be maintained on half : of the bridge while a new deck is constructed on the other half. For steel girder bri...

  12. Effect of voids in grouted, post-tensioned concrete bridge construction : volume 2--inspection, repair, materials, and risks.

    DOT National Transportation Integrated Search

    2009-09-01

    Post-tensioned (PT) bridges are major structures that carry significant traffic. These bridges are designed and : constructed because they are economical for spanning long distances. In Texas, there are several signature PT : bridges. In the late 199...

  13. 77 FR 56587 - Safety Zone, Atlantic Intracoastal Waterway; Oak Island, NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... maintenance on the NC 133 Fixed Bridge crossing the Atlantic Intracoastal Waterway, mile 311.8, at Oak Island... Beach, Virginia to perform bridge maintenance on the NC 133 Fixed Bridge crossing the Atlantic... encompass the waters directly under the NC 133 Fixed Bridge crossing the Atlantic Intracoastal Waterway...

  14. Construction simulation analysis of 120m continuous rigid frame bridge based on Midas Civil

    NASA Astrophysics Data System (ADS)

    Shi, Jing-xian; Ran, Zhi-hong

    2018-03-01

    In this paper, a three-dimensional finite element model of a continuous rigid frame bridge with a main span of 120m is established by the simulation and analysis of Midas Civil software. The deflection and stress of the main beam in each construction stage of continuous beam bridge are simulated and analyzed, which provides a reliable technical guarantee for the safe construction of the bridge.

  15. Values conflicts in professional-community collaborations.

    PubMed

    Sabin, James E

    2010-01-01

    GAP/I and INP+ represent markedly divergent cultures and therefore highlight the opportunities and strains associated with professional-community collaborations. I believe, however, that the factors that emerge from studying GAP/I-INP+ are not idiosyncratic and are relevant for other professional-community dyads. Every such partnership is likely to require some form of bridging mechanism to serve the same purposes as Mr Varghese's role did. The task of creating a zone of optimal tension may be less familiar than the need to build bridges but it is no less important. Tension between partners with significantly different cultural backgrounds has tremendous potential for generating misunderstanding and distrust. Avoiding tension-laden issues is likely to entail significant cost, whether in the form of resentment, distrust, withdrawal, or settling for a lesser outcome than could be achieved. Finally, creating and sustaining the potential for constructive tension typically requires the humble virtues associated with servant-leadership: patience, persistence and understanding.

  16. 20. San FranciscoOakland Bay Bridge contract recipients, April 28, 1933, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. San Francisco-Oakland Bay Bridge contract recipients, April 28, 1933, photographer unknown. Standing, left to right: Edward J. Schneider, Columbia Steel Corporation; C.C. Horton, Healy-Tibbitts Construction Company; Henry J. Kaiser, Bridge Builders, Inc.; Albert Huber, Clinton Construction Company; Allan McDonald, Transbay Construction Company; C.C. Carleton, Chief, Division of Contracts and Rights of Way, California Department of Public Works. Seated, left to right: Henry J. Brunnier, Consulting Engineer, Member of Consulting Board, San Francisco-Oakland Bay Bridge; Charles E. Andrew, Bridge Engineer, San Francisco-Oakland Bay Bridge; Earl Lee Kelly, Director, California Department of Public Works; Harrison S. Robinson, President, Financial ... - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA

  17. Bridge Structure, Foundation and Approach Embankment Performance for the October-November 2002 Earthquake Sequence on the Denali Fault, Alaska

    NASA Astrophysics Data System (ADS)

    Vinson, T. S.; Hulsey, L.; Ma, J.; Connor, B.; Brooks, T. E.

    2002-12-01

    More than two dozen major bridges were subjected to severe ground motions during the October-November 2002 Earthquake Sequence on the Denali Fault, Alaska. The bridges represented a number of conventional designs constructed over the past three to four decades. The objective of the field investigation presented herein was to determine the extent of the damage, if any, to the bridge structures, foundations and approach embankments. This was accomplished by direct inspection of the bridges by the authors (or employees of their organizations) along the Richardson, Alaska, Parks, and Denali Highways, the Tok Cutoff, and the railroad bridges for the railroad alignment between Trapper Creek and Fairbanks. More specifically, the members of the investigation team (represented by the authors) conducted more than three days of field inspections of bridges within the zone of severe ground shaking during the M6.7 and M7.9 Denali fault events. The primary conclusion noted was that while a substantial number of bridges were subjected to intense shaking they all performed very well and were not damaged to the extent that remedial repairs to the bridge structure were necessary. There were occurrences of lateral spreading/liquefaction related damage to the approach embankments and slight separation of the approach embankment from the abutment foundation systems. Overall, considering the severity of ground shaking, much greater damage to the bridge structures, foundations and approach embankments would be predicted. Had the earthquakes occurred during winter when the ground was frozen and the ductility of the structures was substantially reduced events comparable to the October-November 2002 Earthquake Sequence on the Denali Fault, Alaska could have resulted in significant damage to bridges. This reconnaissance was supported by the National Science Foundation, Alaska Dept. of Transportation and Public Facilities, and the Alaska Railroad Corporation.

  18. Structural Impact of Construction Loads : [Technical Summary

    DOT National Transportation Integrated Search

    2012-01-01

    Numerous bridge construction accidents have occurred : because of construction loadings, which are an underemphasized : topic in many specifications and design : manuals. Bridge girders are least stable during the : construction phase, so it is impor...

  19. Nonlinear fracture of concrete and ceramics

    NASA Technical Reports Server (NTRS)

    Kobayashi, Albert S.; Du, Jia-Ji; Hawkins, Niel M.; Bradt, Richard C.

    1989-01-01

    The nonlinear fracture process zones in an impacted unnotched concrete bend specimen, a prenotched ceramic bend specimen, and an unnotched ceramic/ceramic composite bend specimen were estimated through hybrid experimental numerical analysis. Aggregate bridging in concrete, particulate bridging in ceramics, and fiber bridging in ceramic/ceramic composite are modeled by Barenblatt-type cohesive zones which are incorporated into the finite-element models of the bend specimens. Both generation and propagation analyses are used to estimate the distribution of crack closure stresses in the nonlinear fracture process zones. The finite-element models are then used to simulate fracture tests consisting of rapid crack propagation in an impacted concrete bend specimen, and stable crack growth and strain softening in a ceramic and ceramic/ceramic composite bend specimens.

  20. Precast concrete elements for accelerated bridge construction : laboratory testing, field testing, and evaluation of a precast concrete bridge, Black Hawk County.

    DOT National Transportation Integrated Search

    2009-01-01

    The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa : DOT Office of Bridges and Structures. Black Hawk County (BHC) has developed a precast modified beam-in-slab bridge (PMBI...

  1. 77 FR 1407 - Regulated Navigation Area; Memorial Bridge Construction, Piscataqua River, Portsmouth, NH

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-10

    ...-AA11 Regulated Navigation Area; Memorial Bridge Construction, Piscataqua River, Portsmouth, NH AGENCY... River under and surrounding the Memorial Bridge between Portsmouth, NH and Kittery, ME. This temporary interim rule is necessary to provide for the safety of life on the navigable waters during bridge...

  2. Structural Impact of Construction Loads : [Technical Summary

    DOT National Transportation Integrated Search

    2012-01-01

    Numerous bridge construction accidents have occurred because of construction loadings, which are an underemphasized topic in many specifications and design manuals. Bridge girders are least stable during the construction phase, so it is important for...

  3. Field performance of timber bridges. 10, Sanborn Brook stress-laminated deck bridge

    Treesearch

    P. D. Hilbrich Lee; J. P. Wacker; M. A. Ritter

    The Sanborn Brook bridge was constructed in August 1991, 10 miles northeast of Concord, New Hampshire, as part of the demonstration timber bridge program of the USDA Forest Service. The bridge is a simple-span, double-lane, stress-laminated deck superstructure constructed from Southern Pine lumber and is approximately 25 ft long and 28 ft wide with a skew of 14 degrees...

  4. Compilation of accelerated bridge construction (ABC) bridges : final report.

    DOT National Transportation Integrated Search

    2016-01-01

    Development of accelerated bridge construction (ABC) technologies has been occurring across the country, many times in : isolation. Although FHWA and others have worked to facilitate communication between these efforts, there was not a : comprehensiv...

  5. TOPOGRAPHIC VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    TOPOGRAPHIC VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, VIEW TO SOUTHEAST. - Rex T. Barber Veterans Memorial Bridge, Spanning Crooked River Gorge, Dalles-California Highway (US 97), Terrebonne, Deschutes County, OR

  6. ELEVATION VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ELEVATION VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, VIEW TO NORTH. - Rex T. Barber Veterans Memorial Bridge, Spanning Crooked River Gorge, Dalles-California Highway (US 97), Terrebonne, Deschutes County, OR

  7. Accelerating bridge construction to minimize traffic disruption : research spotlight.

    DOT National Transportation Integrated Search

    2013-12-01

    Since 2008, MDOT has been using accelerated bridge construction, which utilizes prefabricated components and structural placements, to minimize traffic disruptions during bridge replacement or rehabilitation. A recent project provided MDOT with a new...

  8. 77 FR 44466 - Safety Zone, Atlantic Intracoastal Waterway; Oak Island, NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ... the safety of mariners on navigable waters during maintenance of the NC 133 Fixed Bridge crossing the... Beach, Virginia to perform bridge maintenance on the NC 133 Fixed Bridge crossing the Atlantic... Coast Guard will require a one hour notification to the work supervisor at the NC 133 Fixed Bridge at...

  9. 78 FR 23519 - Safety Zone; Atlantic Intracoastal Waterway; Wrightsville Beach, NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... waters during maintenance on the US 74/76 Bascule Bridge crossing the Atlantic Intracoastal Waterway... announced by a later notice in the Federal Register. B. Regulatory History and Information The Coast Guard... Bridge Company of Coraopolis, PA to perform bridge maintenance on the U.S. 74/76 Bascule Bridge crossing...

  10. 78 FR 55337 - Buy America Waiver Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ... components for construction of Monon Trail Bridge over SR 25 in Indiana. DATES: The effective date of the... bridge components for construction of Monon Trail Bridge over SR 25 in Indiana. The Indiana Department of Transportation (INDOT) requested this waiver for an overpass to carry the Monon High Bridge Trail across the new...

  11. 78 FR 59237 - Regulated Navigation Area-Weymouth Fore River, Fore River Bridge Construction, Weymouth and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ...-AA11 Regulated Navigation Area--Weymouth Fore River, Fore River Bridge Construction, Weymouth and... vicinity of the Fore River Bridge (Mile 3.5) between Weymouth and Quincy, MA. This rule will place temporary speed, wake, and entry restrictions on vessels during bridge replacement operations. This rule is...

  12. 78 FR 59231 - Regulated Navigation Area-Tappan Zee Bridge Construction Project, Hudson River; South Nyack and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... 1625-AA11 Regulated Navigation Area--Tappan Zee Bridge Construction Project, Hudson River; South Nyack... Hudson River surrounding the Tappan Zee Bridge. This temporary interim rule allows the Coast Guard to enforce speed and wake restrictions and prohibit all vessel traffic through the RNA during bridge...

  13. 78 FR 12260 - Regulated Navigation Area-Weymouth Fore River, Fore River Bridge Construction, Weymouth and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ...-AA11 Regulated Navigation Area--Weymouth Fore River, Fore River Bridge Construction, Weymouth and... under and surrounding the Fore River Bridge (Mile 3.5) between Weymouth and Quincy, MA until December 31... prohibit all vessel traffic through the RNA during bridge replacement operations, both planned and...

  14. Phase and widening construction of steel bridges.

    DOT National Transportation Integrated Search

    2014-03-01

    Phase construction is used to maintain traffic without interruption and generally refers to sequenced construction where a portion of the bridge is under construction while the remainder continues to carry traffic. The method typically results in two...

  15. 37. MISSISSIPPI, LOWNDES CO. COLUMBUS BRIDGE, CONSTRUCTION End of Main ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. MISSISSIPPI, LOWNDES CO. COLUMBUS BRIDGE, CONSTRUCTION End of Main St., Columbus Overhead view of round, swing pier, showing steel reinforcing rods, workmen. During construction, 1925-27. Credit: Shenks Photography, Columbus, Ms, owner. O. Pruitt, photographer, ca. 1926. Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Columbus, Lowndes County, MS

  16. New conceptual design of portable bamboo bridge for emergency purposes

    NASA Astrophysics Data System (ADS)

    Musthaffa, A. A.; Nor, N. M.; Yusof, M. A.; Yuhazri, M. Y.

    2018-02-01

    Portable bridges serve as routes for troops during the military operations and the disaster relief operation. Nowadays, bamboo has been regarded as one of the alternative construction materials for building and bridge structures. This paper presents the conceptual design of the portable bridge. Several types of portable bridges and bamboo bridges are reviewed in the current work. The characteristics, capability and method of construction of each bridge are discussed. Finally, the conceptual of the portable bamboo bridge for emergency purposes is presented. The idea of producing portable bridge is proposed in the current work as it is crucial for providing route for communities affected by natural disasters.

  17. PERSPECTIVE VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PERSPECTIVE VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, VIEW TO NORTH ON WEST SIDE. - Rex T. Barber Veterans Memorial Bridge, Spanning Crooked River Gorge, Dalles-California Highway (US 97), Terrebonne, Deschutes County, OR

  18. 77 FR 28255 - Safety Zone; Upper Mississippi River, Mile 183.0 to 183.5

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-14

    ...-AA00 Safety Zone; Upper Mississippi River, Mile 183.0 to 183.5 AGENCY: Coast Guard, DHS. ACTION... Upper Mississippi River, from mile 183.0 to mile 183.5, in the vicinity of the Merchants Bridge and... Merchants Bridge in the vicinity of mile 183.0 to 183.5 on the Upper Mississippi River. After initial...

  19. Field performance of timber bridges. 8, Lynches Woods Park stress-laminated deck bridge

    Treesearch

    J. P. Wacker; M. A. Ritter; D. Conger

    The Lynches Woods Park bridge was constructed during the summer of 1990 in Newberry, South Carolina. It is a single-span, single-lane, stress-laminated deck superstructure that measures approximately 30 ft long, 16 ft wide, and 14 in. deep. The bridge is unique in that is one of the first known stress-laminated deck bridges to be constructed of Southern Pine lumber...

  20. Construction of crack-free bridge decks : technical summary.

    DOT National Transportation Integrated Search

    2017-04-01

    The report documents the performance of the decks based on crack surveys performed on the LC-HPC decks and : matching control bridge decks. The specifications for LC-HPC bridge decks, which cover aggregates, concrete, : and construction procedures, a...

  1. Object Markers at Narrow Bridges on Low Volume Rural Roadways

    DOT National Transportation Integrated Search

    1998-09-01

    Bridges are a necessary part of any roadway system. Their construction requires a more sophisticated engineering design analysis and a higher construction cost than that for the roadways connecting them. Until relatively recently, bridge width on low...

  2. Development of a precast bridge deck overhang system

    DOT National Transportation Integrated Search

    2011-02-01

    Prestressed-precast panels are commonly used at interior beams for bridge decks in Texas. The use of these panels can provide ease : of construction, sufficient capacity, and good economy for the construction of bridge decks in Texas. Current practic...

  3. Construction of crack-free bridge decks.

    DOT National Transportation Integrated Search

    2017-04-01

    This serves as the final report on Transportation Pooled-Fund Program Project No. TPF-5(174), Construction : of Crack-Free Bridge Decks. The goal of the study was to implement the most cost-effective techniques for : improving bridge deck life ...

  4. Freshwater mussel salvage and relocation at the Pond Eddy Bridge, Delaware River, New York and Pennsylvania

    USGS Publications Warehouse

    Galbraith, Heather S.; Blakeslee, Carrie J.; Cole, Jeffrey C.

    2018-03-01

    In a study conducted by the U.S. Geological Survey, in cooperation with the Pennsylvania Department of Transportation, freshwater mussels were salvaged and relocated from the anticipated zone of impact for the Pond Eddy Bridge construction project in New York and Pennsylvania. Five 25-meter (m) by 25-m cells along the Pennsylvania bank of the Delaware River were sampled in three generally straight-line passes by four surveyors wearing snorkel gear for a total of 180 survey minutes per cell. All mussels encountered were collected and identified to species. A subset of individuals was marked with shellfish tags, weighed, and measured prior to relocation upstream from the zone of impact. A total of 3,434 mussels, including 3,393 Elliptio complanata (eastern elliptio mussels), 39 Anodonta implicata (alewife floaters), 1 Strophitus undulatus (creeper), and 1 Pyganodon cataracta (eastern floater), were salvaged and relocated. All non-eastern elliptio species were georeferenced using a high-resolution global positioning system unit; a subset of tagged eastern elliptio was placed in transects between georeferenced points. These mussels will be monitored to assess the effects of translocation on mortality and body condition at 1 month, 1 year, and 2 years.

  5. 34. BRIDGE, CONSTRUCTION MISSISSIPPI, LOWNDES CO. COLUMBUS End of Main ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. BRIDGE, CONSTRUCTION MISSISSIPPI, LOWNDES CO. COLUMBUS End of Main St., Columbus Date: 1925-27. Old bridge in background. Photo taken from such (probably east) bank. Credit: Shenks Photography, Columbus, Ms, owner. O. Pruitt, photographer, ca. 1927. Copied by Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Columbus, Lowndes County, MS

  6. Characterization of water-quality and bed-sediment conditions in Currituck Sound, North Carolina, prior to the Mid-Currituck Bridge construction, 2011–15

    USGS Publications Warehouse

    Wagner, Chad R.; Fitzgerald, Sharon; Antolino, Dominick J.

    2015-12-24

    The characterization of water-quality and bed-sediment chemistry in Currituck Sound along the proposed alignment of the Mid-Currituck Bridge summarized herein provides a baseline for determining the effect of bridge construction and bridge deck runoff on environmental conditions in Currituck Sound.

  7. Performance Assessment of Bridges Using GPS: The Juarez Bridge in Culiacan, Mexico

    NASA Astrophysics Data System (ADS)

    Vazquez, G. E.; Gaxiola-Camacho, J. R.; Trejo, M.; Echagaray, J.; Guzman, G. M.

    2015-12-01

    Performance assessment of bridges has become very important during recent years. Bridges around the world are aging, leading to the incorporation of efficient, reliable, and economic evaluation procedures. These techniques must assess properly the performance of bridges under several loading conditions in a real manner, representing the physics of the problem. Among several approaches, Global Positioning System (GPS) can be intelligently used for the performance evaluation of bridges. We focused on GPS, since it naturally produces position estimates as compared to seismic instruments that record either velocity or acceleration, and thus require an integration. There are several reasons that make the Juarez Bridge a case of study for evaluation: it is approximately 45 years old, it is a reinforced concrete structure, it connects two significant zones of the city, and its spans is closely to 200 meters long. In addition, thousands of vehicles and pedestrians use the Juarez Bridge every day, which make feasible the GPS performance assessment. Hence, in order to produce optimal position estimates, GPS data were collected during two consecutive hours at three different periods of the day for a whole week (Monday through Sunday), to represent three critical limit states of the bridge (mid-span and end-spans). GPS data were processed using the GAMIT/GLOBK software, considering 1-second sampling rate, 15-degree cutoff angle, ionosphere-free double-differenced (DD) carrier phase method, and precise final orbits disseminated by IGS (International GNSS Service). The displacements obtained from the above discussed procedure are compared with allowable values documented in bridge construction manuals. Reliability theory was used to evaluate the probability of failure of the bridge for the three periods of the day. In addition, a conclusion was made about the most risky day of the week for the use of the Juarez Bridge. It is expected that the results from the proposed research will provide enough information to document non-permissible movements of the Juarez Bridge. Finally, guidance for future retrofit of the structure will be fully available.

  8. Determination of brace forces caused by construction loads and wind loads during bridge construction.

    DOT National Transportation Integrated Search

    2014-04-01

    The first objective of this study was to develop procedures for determining bracing forces during bridge construction. : Numerical finite element models and analysis techniques were developed for evaluating brace forces induced by construction loads ...

  9. The Deformation of Overburden Soil and Interaction with Pile Foundations of Bridges Induced by Normal Faulting

    NASA Astrophysics Data System (ADS)

    Wu, Liang-Chun; Li, Chien-Hung; Chan, Pei-Chen; Lin, Ming-Lang

    2017-04-01

    According to the investigations of well-known disastrous earthquakes in recent years, ground deformation induced by faulting is one of the causes for engineering structure damages in addition to strong ground motion. Most of structures located on faulting zone has been destroyed by fault offset. Take the Norcia Earthquake in Italy (2016, Mw=6.2) as an example, the highway bridge in Arquata crossing the rupture area of the active normal fault suffered a quantity of displacement which causing abutment settlement, the piers of bridge fractured and so on. However, The Seismic Design Provisions and Commentary for Highway Bridges in Taiwan, the stating of it in the general rule of first chapter, the design in bridges crossing active fault: "This specification is not applicable of making design in bridges crossing or near active fault, that design ought to the other particular considerations ".This indicates that the safty of bridges crossing active fault are not only consider the seismic performance, the most ground deformation should be attended. In this research, to understand the failure mechanism and the deformation characteristics, we will organize the case which the bridges subjected faulting at home and abroad. The processes of research are through physical sandbox experiment and numerical simulation by discrete element models (PFC3-D). The normal fault case in Taiwan is Shanchiao Fault. As above, the research can explore the deformation in overburden soil and the influences in the foundations of bridges by normal faulting. While we can understand the behavior of foundations, we will make the bridge superstructures into two separations, simple beam and continuous beam and make a further research on the main control variables in bridges by faulting. Through the above mentioned, we can then give appropriate suggestions about planning considerations and design approaches. This research presents results from sandbox experiment and 3-D numerical analysis to simulate overburden soil and embedded pile foundations subjected to normal faulting. In order to validate this numerical model, it is compared to sandbox experiments. Since the 3-D numerical analysis corresponds to the sandbox expeiments, the response of pile foundations and ground deformation induced by normal faulting are discussed. To understand the 3-D behavior of ground deformation and pile foundations, the observation such as the triangular shear zone, the width of primary deformation zone and the inclination, displacements, of the pile foundations are discussed in experiments and simulations. Furthermore, to understand the safty of bridges crossing faulting zone. The different superstructures of bridges, simple beam and continuous beam will be discussed subsequently in simulations.

  10. Toward Successful Implementation of Prefabricated Deck Panels to Accelerate the Bridge Construction Process

    DOT National Transportation Integrated Search

    2016-08-01

    The development of accelerated bridge construction (ABC) techniques and connection details has become a national research focus. With the aging of the interstate system and many bridges on key routes requiring extensive rehabilitation or replacement,...

  11. 34. Photographic copy of original construction plan (Wabasha Street Bridge, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Photographic copy of original construction plan (Wabasha Street Bridge, Cantilever Span 1888); web details of cantilever arm connecting first span to first pier - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN

  12. Structural Impact of Construction Loads

    DOT National Transportation Integrated Search

    2012-08-01

    Numerous bridge construction accidents have occurred across the country because of construction loadings, which are an underemphasized : topic in many DOT specifications and design manuals. Bridge girders are least stable when they are subjected to c...

  13. Structural Impact of Construction Loads

    DOT National Transportation Integrated Search

    2012-08-01

    Numerous bridge construction accidents have occurred across the country because of construction loadings, which are an underemphasized topic in many DOT specifications and design manuals. Bridge girders are least stable when they are subjected to con...

  14. Methods for strengthening reinforced concrete bridge girders containing poorly detailed flexural steel using near-surface mounted metallics.

    DOT National Transportation Integrated Search

    2015-08-01

    Many older reinforced concrete deck girder (RCDG) bridges contain straight-bar terminations of flexural reinforcement in : flexural tension zones without special detailing. Common bridge design practice of the 1950s did not consider the additional : ...

  15. 23 CFR 661.41 - After a bridge project has been completed (either PE or construction) what happens with the...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false After a bridge project has been completed (either PE or... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.41 After a bridge project has been completed (either PE or construction) what happens with...

  16. Field performance of timber bridges. 11, Spearfish Creek stress-laminated box-beam bridge

    Treesearch

    J. P. Wacker; M. A. Ritter; K. Stanfill-McMillan

    The Spearfish Creek bridge was constructed in 1992 in Spearfish, South Dakota. It is a single-span, stress-laminated, box-beam superstructure. Performance of the bridge is being monitored for 5 years, beginning at installation. This report summarizes results for the first 3-1/2 years of monitoring and includes information on the design, construction, and field...

  17. 23 CFR 661.41 - After a bridge project has been completed (either PE or construction) what happens with the...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false After a bridge project has been completed (either PE or... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.41 After a bridge project has been completed (either PE or construction) what happens with...

  18. Comparison of properties of fresh and hardened concrete in bridge decks.

    DOT National Transportation Integrated Search

    1971-01-01

    A study was made on 17 bridge decks constructed in 1963 under regular construction procedures. The purpose was (1) to compare important properties of concrete as freshly placed in randomly selected bridge decks with those after hardening of the concr...

  19. 48. Photographic copy of original construction plan (Wabasha St. Bridge, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. Photographic copy of original construction plan (Wabasha St. Bridge, Plan of Masonry for Abutment, Piers No. 1 and 3, 1888); North abutment, first and second piers - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN

  20. 38. Photographic copy of original construction plan (Wabasha Street Bridge, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photographic copy of original construction plan (Wabasha Street Bridge, Detail of South Cantilever Arm, 1888); web details of cantilever arm connecting second pier to third span - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN

  1. ELEVATION VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ELEVATION VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, VIEW OF NORTH ARCH FOLLOWING REMOVAL OF TRAVELING FORMWORK, VIEW TO EAST. - Rex T. Barber Veterans Memorial Bridge, Spanning Crooked River Gorge, Dalles-California Highway (US 97), Terrebonne, Deschutes County, OR

  2. PERSPECTIVE VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PERSPECTIVE VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, VIEW OF SOUTH TRAVELING FORMWORK AND NORTH ARCH PRIOR TO CLOSURE POUR. - Rex T. Barber Veterans Memorial Bridge, Spanning Crooked River Gorge, Dalles-California Highway (US 97), Terrebonne, Deschutes County, OR

  3. PERSPECTIVE VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PERSPECTIVE VIEW OF THE REX T. BARBER BRIDGE ARCH CONSTRUCTION, VIEW TO SOUTH OF SOUTHERN TRAVELING FORMWORK AND CABLE STAY TOWER. - Rex T. Barber Veterans Memorial Bridge, Spanning Crooked River Gorge, Dalles-California Highway (US 97), Terrebonne, Deschutes County, OR

  4. In-service performance monitoring of a CFRP reinforced HPC bridge deck.

    DOT National Transportation Integrated Search

    2010-08-01

    The Rollins Road Bridge in Rollinsford, New Hampshire was constructed in part with funding from the FHWAs Innovative Bridge Research and Construction (IBRC) program and opened to traffic in December, 2000. A requirement of the IBRC program is the ...

  5. 32. BRIDGE, CONSTRUCTION Tombigbee R. MISSISSIPPI, LOWNDES CO. COLUMBUS End ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. BRIDGE, CONSTRUCTION Tombigbee R. MISSISSIPPI, LOWNDES CO. COLUMBUS End of Main St., Columbus Center and east pier, with framing, during construction, 1925-27. Makes panorama with next photo. Note steam crane on framing. Credit: Shenks Photography, Columbus, MS, owner. O. Pruitt, photographer. Copied by Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Columbus, Lowndes County, MS

  6. Comparative Laboratory and Numerical Simulations of Shearing Granular Fault Gouge: Micromechanical Processes

    NASA Astrophysics Data System (ADS)

    Morgan, J. K.; Marone, C. J.; Guo, Y.; Anthony, J. L.; Knuth, M. W.

    2004-12-01

    Laboratory studies of granular shear zones have provided significant insight into fault zone processes and the mechanics of earthquakes. The micromechanisms of granular deformation are more difficult to ascertain, but have been hypothesized based on known variations in boundary conditions, particle properties and geometries, and mechanical behavior. Numerical simulations using particle dynamics methods (PDM) can offer unique views into deforming granular shear zones, revealing the precise details of granular microstructures, particle interactions, and packings, which can be correlated with macroscopic mechanical behavior. Here, we describe a collaborative program of comparative laboratory and numerical experiments of granular shear using idealized materials, i.e., glass beads, glass rods or pasta, and angular sand. Both sets of experiments are carried out under similar initial and boundary conditions in a non-fracturing stress regime. Phenomenologically, the results of the two sets of experiments are very similar. Peak friction values vary as a function of particle dimensionality (1-D vs. 2-D vs. 3-D), particle angularity, particle size and size distributions, boundary roughness, and shear zone thickness. Fluctuations in shear strength during an experiment, i.e., stick-slip events, can be correlated with distinct changes in the nature, geometries, and durability of grain bridges that support the shear zone walls. Inclined grain bridges are observed to form, and to support increasing loads, during gradual increases in assemblage strength. Collapse of an individual grain bridge leads to distinct localization of strain, generating a rapidly propagating shear surface that cuts across multiple grain bridges, accounting for the sudden drop in strength. The distribution of particle sizes within an assemblage, along with boundary roughness and its periodicity, influence the rate of formation and dissipation of grain bridges, thereby controlling friction variations during shear.

  7. Improving bridges with prefabricated precast concrete systems.

    DOT National Transportation Integrated Search

    2013-12-01

    In order to minimize the impact of construction on the traveling public, MDOT utilizes innovative and specialized construction methods such as Accelerated Bridge Construction (ABC). Michigan, like other highway agencies in the region, has several cha...

  8. Evaluating Louisiana new deck continuity detail for precast prestressed concrete girder bridges : research project capsule.

    DOT National Transportation Integrated Search

    2014-08-01

    The goal of everyone in the transportation community is to build bridges : that are economic, easy to construct, and durable. Therefore, accelerating : bridge construction through the use of precast concrete or prefabricated : steel girders is a comm...

  9. Research on construction technology for orthotropic steel deck pavement of Haihe River Chunyi Bridge

    NASA Astrophysics Data System (ADS)

    Xue, Y. C.; Qian, Z. D.; Zhang, M.

    2017-01-01

    In order to ensure the good service quality of orthotropic steel deck pavement of Haihe River Chunyi Bridge in Tianjin, and to reduce the occurrence of pavement diseases like lateral and longitudinal cracks, the key working procedures such as steel deck cleaning, anticorrosive coating, bonding layer spraying, seam cutting, epoxy asphalt concrete’s mixing, transportation, paving and compaction were studied. The study was based on the main features of epoxy asphalt concrete which is the pavement materials of Haihe River Chunyi Bridge, and combined with the basic characteristics and construction conditions of Haihe River Chunyi Bridge. Furthermore, some processing measures like controlling time and temperature, continuous paving with two pavers, lateral feeding, and improving the compaction method were proposed. The project example shows that the processing measures can effectively solve the technical difficulties in the construction of orthotropic steel deck pavement of Haihe River Chunyi Bridge, can greatly improve the construction speed and quality, and can provide reference for the same kinds of orthotropic steel deck pavement construction.

  10. Field performance of timber bridges. 13, Mohawk Canal stress-laminated bridge

    Treesearch

    P. D. Hilbrich Lee; X. Lauderdale

    The Mohawk Canal bridge was constructed in August 1994, just outside Roll, Arizona. It is a simple-span, double-lane, stress-laminated deck superstructure, approximately 6.4 m (21 ft) long and 10.4 m (34 ft) wide and constructed with Combination 16F-V3 Douglas Fir glued-laminated timber beam laminations. The performance of the bridge was monitored continuously for 2...

  11. Study on the use of self-consolidating concrete on the Interstate 25 bridge replacement in Trinidad, CO.

    DOT National Transportation Integrated Search

    2010-12-01

    As part of a national experiment sponsored by the FHWA under the Innovative Bridge Research and Construction (IBRC) : program, CDOT used self-consolidating concrete (SCC) to construct abutments, piers, and retaining walls on a bridge : replacement pr...

  12. Long-term behavior of integral abutment bridges : appendix B, SR18 over the Mississinewa River Bridge soil borings.

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment (IA) construction has become the preferred method over conventional construction for use with typical highway bridges. However, the use of these structures is limited due to state mandated length and skew limitations. To expand thei...

  13. Long-term behavior of integral abutment bridges : appendix E, INDOT design manual : selected recommendations for integral abutment bridges.

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment (IA) construction has become the preferred method over conventional construction for use with typical highway bridges. However, the use of these structures is limited due to state mandated length and skew limitations. To expand thei...

  14. Design, installation, and condition assessment of a concrete bridge deck constructed with ASTM A1035 CS no. 4 bars.

    DOT National Transportation Integrated Search

    2017-06-01

    Recently developed corrosion-resistant reinforcing structural design guidelines were used to design, construct, and : assess a reinforced concrete bridge deck with high-strength ASTM A1035 CS steel bars. The bridge replacement is located : along the ...

  15. Precast concrete elements for accelerated bridge construction : laboratory testing of precast substructure components, Boone County bridge.

    DOT National Transportation Integrated Search

    2009-01-01

    Vol. 1-1: In July 2006, construction began on an accelerated bridge project in Boone County, Iowa that was composed of precast substructure : elements and an innovative, precast deck panel system. The superstructure system consisted of full-depth dec...

  16. 77 FR 64720 - Safety Zone: Atlantic Intracoastal Waterway; Oak Island, NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... 133 Fixed Bridge crossing the Atlantic Intracoastal Waterway, mile 311.8, at Oak Island, North... NC 133 Fixed Bridge crossing the Atlantic Intracoastal Waterway, mile 311.8, at Oak Island, North... under the NC 133 Fixed Bridge crossing the Atlantic Intracoastal Waterway, mile 311.8, at Oak Island...

  17. Experimental Study on Voided Reinforced Concrete Beams with Polythene Balls

    NASA Astrophysics Data System (ADS)

    Sivaneshan, P.; Harishankar, S.

    2017-07-01

    The primary component in any structure is concrete, that exist in buildings and bridges. In present situation, a serious problems faced by construction industry is exhaustive use of raw materials. Recent times, various methods are being adopted to limit the use of concrete. In structural elements like beams, polythene balls can be induced to reduce the usage of concrete. A simply supported reinforced concrete beam has two zones, one above neutral axis and other below neutral axis. The region below neutral axis is in tension and above neutral axis is in compression. As concrete is weak in tension, steel reinforcements are provided in tension zone. The concrete below the neutral axis acts as a stress transfer medium between the compression zone and tension zone. The concrete above the neutral axis takes minimum stress so that we could partially replace the concrete above neutral axis by creating air voids using recycled polythene balls. Polythene balls of varying diameters of 75 mm, 65 mm and 35 mm were partially replaced in compression zone. Hence the usage of concrete in beams and self-weight of the beams got reduced considerably. The Load carrying capacity, Deflection of beams and crack patterns were studied and compared with conventional reinforced concrete beams.

  18. Construction of prestressed concrete single-tee bridge superstructures.

    DOT National Transportation Integrated Search

    1977-01-01

    This report discusses in detail the construction of the first five precast, prestressed concrete, single-tee beam bridge superstructures to be let to contract in Virginia. The data suggest that this single-tee beam enables efficient construction of t...

  19. Review on antibacterial characteristics of bridge engineering biomaterials.

    PubMed

    Zhao, Qing-Qing; Chen, Meng-Yao; He, Rui-Lin; Zhang, Zhong-Feng; Ashraf, Muhammad Aqeel

    2016-01-01

    This review summarizes the research on timber construction materials used in bridge construction. It focuses on the application of antiseptic treatments and the use of timber engineering materials in decks and bridges. This review also provides an overview on the future research and prospects of engineered timber materials.

  20. Monitoring system of arch bridge for safety network management

    NASA Astrophysics Data System (ADS)

    Joo, Bong Chul; Yoo, Young Jun; Lee, Chin Hyung; Park, Ki Tae; Hwang, Yoon Koog

    2010-03-01

    Korea has constructed the safety management network monitoring test systems for the civil infrastructure since 2006 which includes airport structure, irrigation structure, railroad structure, road structure, and underground structure. Bridges among the road structure include the various superstructure types which are Steel box girder bridge, suspension bridge, PSC-box-girder bridge, and arch bridge. This paper shows the process of constructing the real-time monitoring system for the arch bridge and the measured result by the system. The arch type among various superstructure types has not only the structural efficiency but the visual beauty, because the arch type superstructure makes full use of the feature of curve. The main measuring points of arch bridges composited by curved members make a difference to compare with the system of girder bridges composited by straight members. This paper also shows the method to construct the monitoring system that considers the characteristic of the arch bridge. The system now includes strain gauges and thermometers, and it will include various sensor types such as CCTV, accelerometers and so on additionally. For the long term and accuracy monitoring, the latest optical sensors and equipments are applied to the system.

  1. Vibration analysis of the Second Saikai Bridge—a concrete filled tubular (CFT) arch bridge

    NASA Astrophysics Data System (ADS)

    Yoshimura, Mistuhiro; Wu, Qingxiong; Takahashi, Kazuo; Nakamura, Shozo; Furukawa, Kazuyoshi

    2006-02-01

    Concrete-filled steel tubular (CFT) arch bridges have been rapidly developing in China since 1990. Research has focused on the static behavior, thermal stress and erection technique, however, and there has been very little research of natural vibrations and dynamic responses of these bridges. Japan's first CFT arch bridge in highway bridges, the Second Saikai Bridge, is now under construction in Nagasaki Prefecture. Furthermore, this bridge has a pedestrian bridge that is suspended under the girder, which is rare. Therefore, the natural vibration properties are examined, and the influence of pedestrian bridge structure on the natural vibration of main bridge is discussed first. Response analysis under a moving vehicle and pedestrian is carried out, and the response characteristics and response level are clarified. The natural vibrations and responses are compared to those of CFT arch bridges that have been constructed in China. Results show the fine performance of both main bridge and pedestrian bridge of the Second Saikai Bridge.

  2. Long-term behavior of integral abutment bridges : appendix A, construction plans.

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment (IA) construction has become the preferred method over conventional construction for use with typical highway bridges. However, the use of these structures is limited due to state mandated length and skew limitations. To expand thei...

  3. Environment Impact Analysis of Shield Passing Alongside Bridge Pile Platform Using Three Dimensional Numerical Simulation

    NASA Astrophysics Data System (ADS)

    Shang, Yanliang; Shi, Wenjun; Han, Tongyin; Qin, Zhichao; Du, Shouji

    2017-10-01

    The shield method has many advantages in the construction of urban subway, and has become the preferred method for the construction of urban subway tunnel. Taking Shijiazhuang metro line 3 (administrative center station - garden park station interval) Passing alongside bridge as the engineering background, double shield crossing the bridge pile foundation model was set up. The deformation and internal force of the pile foundation during the construction of the shield were analyzed. Pile stress caused by shield construction increases, but the maximum stress is less than the design strength; the maximum surface settlement caused by the construction of 10.2 mm, the results meet the requirements of construction.

  4. 1857 PatentExtant Construction Comparison Powerscourt Bridge, Spanning Chateauguay River, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1857 Patent-Extant Construction Comparison - Powerscourt Bridge, Spanning Chateauguay River, First Concession Road, Elgin/Hichinbrooke, Huntingdon County, Quebec, Canada, Chateaugay, Franklin County, NY

  5. Caisson disease during the construction of the Eads and Brooklyn Bridges: A review.

    PubMed

    Butler, W P

    2004-01-01

    The Eads Bridge (St. Louis) and the Brooklyn Bridge (New York City) were testing grounds for caisson construction. These caissons were enormous compressed air boxes used to build riverine piers and abutments anchoring the bridges. Caisson meant faster and cheaper construction, but there was a hidden cost---caisson disease (decompression sickness). Within caissons, workers labored at pressures as high as 55 psig and caisson disease was common. This discourse is a brief history of the caisson, a brief discussion of the illness as viewed in the mid 1800's, and an abbreviated history of the Eads and Brooklyn Bridges. It also provides a detailed description and evaluation of the observations, countermeasures, and recommendations of Dr. Alphonse Jaminet, the Eads Bridge physician, and Dr. Andrew Smith, the Brooklyn Bridge physician, who published reports of their experience in 1871 and 1873, respectively. These and other primary sources permit a detailed examination of early caisson disease and Jaminet's and Smith's thinking also serve as good examples from which to study and learn.

  6. 77 FR 35906 - Safety Zone, Atlantic Intracoastal Waterway; Oak Island, NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... navigable waters during maintenance of the NC 133 Fixed Bridge crossing the Atlantic Intracoastal Waterway... maintenance on the NC 133 Fixed Bridge crossing the Atlantic Intracoastal Waterway, mile 311.8, at Oak Island... notification to the work supervisor at the NC 133 Fixed Bridge at the Atlantic Intracoastal Waterway crossing...

  7. 77 FR 41911 - Safety Zone, Atlantic Intracoastal Waterway; Wrightsville Beach, NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-17

    ... safety of mariners on navigable waters during maintenance on the U.S. 74/76 Bascule Bridge crossing the... Rulemaking A. Regulatory History and Information On May 23, 2012 a Notice of Proposed Rule Making (NPRM) was... has awarded a contract to American Bridge Company of Coraopolis, PA to perform bridge maintenance on...

  8. Evaluation of grit-impregnated, epoxy coated prestressing strand on South Slough (Charleston) Bridge : construction report.

    DOT National Transportation Integrated Search

    1991-12-01

    Construction of the South Slough (Charleston) Bridge was completed in March of 1991. The structure was constructed with prestressed concrete beams using grit-impregnated, epoxy coated prestressing strands. While epoxy coated reinforcing steel has bee...

  9. Determination of brace forces caused by construction loads and wind loads during bridge construction : [summary].

    DOT National Transportation Integrated Search

    2014-04-01

    Bridges are constructed in stages as pilings, : columns, girders, decks, and other components : are added. At each stage, the structure must be : stable. Girders, which add significant weight to : the developing structure, rest on elastomeric : beari...

  10. Design, construction and load testing of the Pat Daly Bridge in Washington County, MO, with internal glass fiber reinforced polymers reinforcement.

    DOT National Transportation Integrated Search

    2013-01-01

    The overarching goal of this project is to deploy and assess an innovative corrosion-free bridge construction technology for long-term : performance of new and existing bridges. The research objective of this project is to conduct a comprehensive stu...

  11. Development and construction of low-cracking high-performance concrete (LC-HPC) bridge decks : free shrinkage, moisture optimization and concrete production : final report.

    DOT National Transportation Integrated Search

    2009-08-01

    The development and evaluation of low-cracking high-performance concrete (LC-HPC) for use in bridge decks : is described based on laboratory test results and experience gained during the construction of 14 bridges. This report : emphasizes the materi...

  12. 34. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: Plan of masonry. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  13. Development and construction of low-cracking high-performance concrete (LC-HPC) bridge decks : free shrinkage, moisture optimization and concrete production : summary report.

    DOT National Transportation Integrated Search

    2009-08-01

    The development and evaluation of low-cracking high-performance concrete (LC-HPC) for use in bridge decks : is described based on laboratory test results and experience gained during the construction of 14 bridges. This report : emphasizes the materi...

  14. Design, construction and load testing of the Pat Daly road bridge in Washington County, MO, with internal glass fiber reinforced polymers reinforcement.

    DOT National Transportation Integrated Search

    2013-01-01

    The overarching goal of this project is to deploy and assess an innovative corrosion-free bridge construction technology for long-term : performance of new and existing bridges. The research objective of this project is to conduct a comprehensive stu...

  15. 78 FR 2371 - Taking of Marine Mammals Incidental to Specified Activities; Construction of the East Span of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-11

    ...-Oakland Bay Bridge AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric..., harbor porpoises, and gray whales, by harassment, incidental to construction of a replacement bridge for the East Span of the San Francisco-Oakland Bay Bridge (SF- OBB) in California. DATES: This...

  16. 33 CFR 165.T11-0511 - Safety Zone; Big Sioux River from the Military Road Bridge North Sioux City to the confluence of...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the Military Road Bridge North Sioux City to the confluence of the Missouri River, SD. 165.T11-0511... River from the Military Road Bridge North Sioux City to the confluence of the Missouri River, SD. (a... Bridge, North Sioux City, SD at 42.52 degrees North, 096.48 West longitude to the confluence of the...

  17. U.S. Geological Survey - Virginia Department of Transportation: Bridge scour pilot study

    USGS Publications Warehouse

    Austin, Samuel H.

    2018-02-27

    BackgroundCost effective and safe highway bridge designs are required to ensure the long-term sustainability of Virginia’s road systems. The streamflows that, over time, scour streambed sediments from bridge piers inherently affect bridge safety and design costs. To ensure safety, bridge design must anticipate streambed scour at bridge piers over the lifespan of a bridge. Until recently Federal Highway Administration (FHWA) guidance provided only for scour estimates of granular, noncohesive, highly erosive material yielding overestimates of scour potential in instances when streambed materials offer some resistance to scour. This study seeks to estimate stream power and streambed scour for these more resistive sites, with bridge piers potentially established in cohesive soil or erodible rock. This new knowledge may provide significant construction cost savings while ensuring design and construction of safe highway bridges.

  18. A survey and photographic inventory of metal truss bridges in Virginia, 1865-1932 : V : the Richmond construction district.

    DOT National Transportation Integrated Search

    1976-01-01

    Prior to 1932, road maintenance and construction in Virginia were largely the responsibility of the individual county governments. Bridge construction projects, based on local requirements, formed a natural part of these activities. Local responsibil...

  19. A survey and photographic inventory of metal truss bridges in Virginia, 1865-1932 : IV : the Fredericksburg construction district.

    DOT National Transportation Integrated Search

    1976-01-01

    Prior to 1932, road maintenance and construction in Virginia were largely the responsibility of the individual county governments. Bridge construction projects, based on local requirements, formed a natural part of these activities. Local responsibil...

  20. A survey and photographic inventory of metal truss bridges in Virginia, 1865-1932 : II : the Staunton construction district.

    DOT National Transportation Integrated Search

    1975-01-01

    Prior to 1932, road maintenance and construction in Virginia were largely the responsibility of the individual county governments. Bridge construction projects formed a natural part of these activities. Local responsibility resulted in a rich variety...

  1. A survey and photographic inventory of metal truss bridges in Virginia, 1865-1932 : III : the Culpeper construction district.

    DOT National Transportation Integrated Search

    1975-01-01

    Prior to 1932, road maintenance and construction in Virginia were largely the responsibility of the individual county governments. Bridge construction projects formed a natural part of these activities. Local responsibility resulted in a rich variety...

  2. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Application. An application for authorization to construct a bridge across navigable waters of...

  3. A Bridge Too Far: Suppressing Frost Using an Out-of-Plane Dry Zone

    NASA Astrophysics Data System (ADS)

    Spohn, Corey; Ahmadi, Farzad; Nath, Saurabh; Boreyko, Jonathan

    2017-11-01

    It has recently been shown that ice can suppress the formation of any nearby condensation or frost on a substrate. However, these in-plane dry zones require the hygroscopic ice features to be placed on the same surface they are helping to keep dry, which makes it impossible to achieve complete anti-frosting. Here, we create an out-of-plane dry zone by holding two aluminum surfaces parallel to each other, where a uniform sheet of frost was grown on one surface to keep the other surface completely dry. The critical separation required to keep the test surface dry was found to be a function of the ambient supersaturation. We also show that inter-droplet ice bridging, now known to be a primary mechanism for in-plane frost growth, can be similarly extended to an out-of-plane configuration. We freeze a droplet on a hydrophobic surface and suspend a water droplet above it, such that an ice bridge grows toward the water droplet. More generally, these findings show that the recently discovered phenomena of dry zones and ice bridging can be extended to out-of-plane scenarios, which could lead to a better understanding of the behavior of mixed-phase systems. This work was supported by the National Science Foundation (CBET-1604272) and by the 3M Company (Non-Tenured Faculty Award).

  4. Inventory and Evaluation of Engineering Cultural Resources: Montgomery to Gadsden, Alabama Coosa River, Alabama,

    DTIC Science & Technology

    1981-03-01

    to retain some of its aesthetic quality. Important bridges were also being constructed outside of France. The Westminister Bridge (1738-50) was built... Legislative Session. It was eventually to connect the waters of Mobile Bay with the Coosa River at Wetumpka, and eventually with the Tennessee. The project...Bridge Act of 1927 were important legislative aids. The state act resulted in the construction of fifteen major bridges, including the attractive

  5. Structural characterization of UHPC waffle bridge deck and connections.

    DOT National Transportation Integrated Search

    2014-07-01

    The AASHTO strategic plan in 2005 for bridge engineering identified extending the service life of bridges and accelerating bridge : construction as two of the grand challenges in bridge engineering. These challenges have the objective of producing sa...

  6. 37. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photographic copy of historic construction drawing, ink on linen, no date (est. January 1890) (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: Plan of masonry approach. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  7. 26. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: General plan of truss spans. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  8. 31. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge (truss spans): Plan of portal struts. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  9. 36. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: General plan of west approach. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  10. 35. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: General plan of east approach. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  11. 32. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. Photographic copy of historic construction drawing, ink on linen, December 1889 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge (truss span): Detail of longitudinal & top struts. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  12. 25. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Photographic copy of historic construction drawing, ink on linen, November 1889/January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Plan and profile of Selby Avenue Bridge. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  13. 30. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. Photographic copy of historic construction drawing, ink on linen, December 1889 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge (truss spans): section of roadway with details. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  14. 29. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: Detail of small truss. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  15. 33. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: Plan of shoes, bolsters, & rollers. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  16. 33. BRIDGE, CONSTRUCTION MISSISSIPPI, LOWNDES CO. COLUMBUS End of Main ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. BRIDGE, CONSTRUCTION MISSISSIPPI, LOWNDES CO. COLUMBUS End of Main St., Columbus Center and east pier, with framing, makes panorama with preceding photo. Date: 1925-27. Credit: Shenks Photographi, Columbus, Ms. owner. O. Pruitt, photographer, ca. 1926 Copied by Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Columbus, Lowndes County, MS

  17. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Approval of plans. An application for authorization to construct a bridge across navigable waters...

  18. Extremadura (Spain): a case to be considered as Global Heritage Stone Province

    NASA Astrophysics Data System (ADS)

    Mota, Maribel; Tejado, Juanjo; Pereira, Dolores

    2015-04-01

    Extremadura is geologically located in the Iberian Massif, belonging part of the Central Iberian Zone, in the north of the region, and the Ossa Morena zone, in the south of it. The Central Iberian Zone is characterized by the abundance of clastic metasedimentary rocks and greywacke, sandstones, shales, conglomerates, quartzites and lesser amounts of carbonate materials such as limestone and dolomite (600-300 Ma). Also featured are Hercynian granitic intrusions. The rocks from the Ossa-Morena zone are metamorphic, intrusive igneous and volcanic (650-300 Ma). Extremadura, given its strategic geographical position, has been the site of human settlement since ancient times, and this civilisation has left its influence on the building materials used in buildings and monuments. The rocks used in building, are directly related to the geology of the immediate area, since rock outcrops, near the construction are mostly granites, slates and marbles. The historic and artistic heritage from Extremadura includes Roman treasures (like the bridges located in the Via de la Plata, dams, walls and milestones), Islamic and Christian treasures as well as medieval and Renaissance Jewish treasures. Extremadura has three World Heritage Sites declared by UNESCO: the old town of Cáceres, the archaeological site at Merida and the monastery of Guadalupe. The latter is built mainly of bricks and masonry. In Merida, granites and diorites of various facies of the batholiths located north of the city are used together with Sierra Carija's marble and quartzite alluvial gravels from the river Guadiana. Among the constructions in Merida, granite utilisation in the theater and amphitheater, aqueduct of Miracles and the Proserpina dam, are remarkable. The old town of Cáceres is characterised by the presence of narrow streets and monuments, medieval churches and Renaissance palaces, built with granite and flanked by a wall constructed during the Muslim period. This granite comes from the quarries within the Araya batholith. Stones from Extremadura deserve to be considered within the Global Heritage Stone Province nomination.

  19. 78 FR 67086 - Safety Zone, Submarine Cable Replacement Operations, Kent Island Narrows; Queen Anne's County, MD

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ... 1625-AA00 Safety Zone, Submarine Cable Replacement Operations, Kent Island Narrows; Queen Anne's County... Guard proposes to establish a temporary safety zone encompassing certain waters of Kent Island Narrows... potential safety hazards associated with the bridge project. Entry into this zone would be prohibited unless...

  20. 77 FR 39632 - Seattle Seafair Unlimited Hydroplane Race

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ... of Lake Washington bounded by the Interstate 90 (Mercer Island/Lacey V. Murrow) Bridge, the western... shoreline of Mercer Island. The regulated area has been divided into two zones. The zones are separated by a... course and then to the northerly tip of Ohlers Island in Andrews Bay. The western zone is designated Zone...

  1. Service life assessment of timber highway bridges in USA climate zones

    Treesearch

    James P. Wacker; Brian K. Brashaw; Thomas G. Williamson; P. David Jones; Matthew S. Smith; Travis K. Hosteng; David L. Strahl; Lola E. Coombe; V.J. Gopu

    2014-01-01

    As engineers begin to estimate life-cycle costs and sustainable design approaches for timber bridges, there is a need for more reliable data about their durability and expected service life. This paper summarizes a comprehensive effort to assess the current condition of more than one hundred timber highway bridge superstructures throughout the United States. This...

  2. Soil-structure interaction studies for understanding the behavior of integral abutment bridges.

    DOT National Transportation Integrated Search

    2012-03-01

    Integral Abutment Bridges (IAB) are bridges without any joints within the bridge deck or between the : superstructure and the abutments. An IAB provides many advantages during construction and maintenance of : a bridge. Soil-structure interactions at...

  3. Recommendations for design, construction, and maintenance of bridge approach slabs : synthesis report.

    DOT National Transportation Integrated Search

    2009-04-01

    Bridge approaches provide smooth and safe transition of vehicles from highway pavements to bridge : structures. However, settlement of the bridge approach slab relative to bridge decks usually creates a : bump in the roadway. The bump causes inconven...

  4. 1. VIEW OF SOUTH ELEVATION OF NOTRE DANE BRIDGE, SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW OF SOUTH ELEVATION OF NOTRE DANE BRIDGE, SHOWING CAUSEWAY, STEEL ARCH, AND EASTBOUND LANE OF NEW BRIDGE UNDER CONSTRUCTION, PARALLELING CAUSEWAY, LOOKING NORTHWEST - Notre Dame Bridge, Spanning Merrimack River on Bridge Street, Manchester, Hillsborough County, NH

  5. Material characterization of field-cast connection grouts.

    DOT National Transportation Integrated Search

    2013-01-01

    Accelerated bridge construction methods can help increase safety and minimize the inconveniences to the traveling public. Many new construction methods have been investigated and implemented using prefabricated subassemblies on bridges. These methods...

  6. 59. Photographic copy of the original construction drawing, 1934, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    59. Photographic copy of the original construction drawing, 1934, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department. Construction changes in pier 7 - Mark Twain Memorial Bridge, Spanning Mississippi River at US Route 36, Hannibal, Marion County, MO

  7. ABC deck panel testing.

    DOT National Transportation Integrated Search

    2013-09-01

    Accelerated Bridge Construction techniques have resulted in innovative options that : save time and money during the construction of bridges. One such group of techniques : that has generated considerable interest is the usage of individual precast c...

  8. Precast alternative for flat slab bridges : final report.

    DOT National Transportation Integrated Search

    2013-10-26

    The cast-in-place (CIP) concrete slab bridge and the hollow core flat slab bridge are two very common bridge types utilized by the : South Carolina Department of Transportation (SCDOT). The CIP bridge is durable but has a long construction time while...

  9. 27. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: Detail of truss (end with inclined end post). - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  10. 28. Photographic copy of historic construction drawing, ink or linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Photographic copy of historic construction drawing, ink or linen, December 1889 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: Detail of truss (end which abuts small truss). - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  11. Fabry-Perot sensors for the monitoring of FRP reinforced bridge decks

    NASA Astrophysics Data System (ADS)

    Benmokrane, Brahim; Quirion, Marco; El-Salakawy, Ehab; Debaiky, Ahmed S.; Lackey, Tom

    2004-07-01

    The extensive use of deicing salts in Canada during winter times is identified as the main reason behind the deterioration of highway bridges and parking garages. To fight this infrastructure crisis, Fibre Reinforced Polymers (FRP) has become a very attractive alternative to traditional reinforcing steel due to their non-corrosive nature and light weight. The replacement of steel with Glass FRP bars in bridge deck slabs has been extensively researched in the last few years. This paper presents the first efforts to implement these bars in two highway bridges in Quebec, Canada, and Vermont, USA. These projects are aimed to prove the feasibility of using GFRP bars in bridge construction. GFRP bars were used as reinforcement for parts of the deck slabs in the two bridges while traditional steel was used in the remaining parts. Fibre Optic Sensors (FOS) were used to measure strains in the concrete, reinforcing bars and steel girders. The sensors were surface mounted on the bars or steel girders using standard glue, or embedded in concrete. Static and dynamic testing of the bridges was done using loaded trucks placed for maximum stresses. The design, construction, testing, and results obtained from the bridges are briefly outlined in this paper. The results indicated the accuracy of the sensors and their feasibility for bridge construction and remote monitoring.

  12. Development of bridge girder movement criteria for accelerated bridge construction.

    DOT National Transportation Integrated Search

    2014-06-01

    End diaphragms connect multiple girders to form a bridge superstructure system for effective resistance to earthquake loads. Concrete : girder bridges that include end diaphragms consistently proved to perform well during previous earthquake events. ...

  13. Evaluation of stainless steel reinforcement construction project

    DOT National Transportation Integrated Search

    2003-02-01

    Stainless steel reinforcement has greater corrosion resistance than that of the conventional reinforcement. In this project, bridge A6059, the first in Missouri utilizing stainless steel reinforcement in the deck, was constructed, along with bridge A...

  14. Long-term behavior of integral abutment bridges.

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment (IA) construction has become the preferred method over conventional construction for use with typical : highway bridges. However, the use of these structures is limited due to state mandated length and skew limitations. To : expand ...

  15. Impact of cascadia subduction zone earthquake on the seismic evaluation criteria of bridges : technical report : SPR 770.

    DOT National Transportation Integrated Search

    2016-12-01

    A large magnitude long duration subduction earthquake is impending in the Pacific Northwest, which lies near the : Cascadia Subduction Zone (CSZ). Great subduction zone earthquakes are the largest earthquakes in the world and are the sole source : zo...

  16. Lean Construction Applications for Bridge Inspection

    DOT National Transportation Integrated Search

    2017-10-01

    Lean philosophy was used to analyze the efficiency of bridge inspection. Emphasis was put on identifying activities that add value to the final output, an owner approved bridge inspection report. 26 bridge inspections were shadowed. Time spent on bri...

  17. A 1-2 GHz pulsed and continuous wave electron paramagnetic resonance spectrometer

    NASA Astrophysics Data System (ADS)

    Quine, Richard W.; Rinard, George A.; Ghim, Barnard T.; Eaton, Sandra S.; Eaton, Gareth R.

    1996-07-01

    A microwave bridge has been constructed that performs three types of electron paramagnetic resonance experiments: continuous wave, pulsed saturation recovery, and pulsed electron spin echo. Switching between experiment types can be accomplished via front-panel switches without moving the sample. Design features and performance of the bridge and of a resonator used in testing the bridge are described. The bridge is constructed of coaxial components connected with semirigid cable. Particular attention has been paid to low-noise design of the preamplifier and stability of automatic frequency control circuits. The bridge incorporates a Smith chart display and phase adjustment meter for ease of tuning.

  18. Field Performance of Timber Bridges. 16: North Siwell Road Stress-Laminated Bridge

    DOT National Transportation Integrated Search

    1998-03-01

    This report is 16th in a series of reports that documents the : field performance of timber bridges. The North Siwell Road bridge was constructed during December 1994 in Hinds County, Mississippi. The bridge is a single span, stress laminated T-beam ...

  19. 6. VIEW OF GDOT BRIDGE NO. 02700268X00678N BRIDGE PLATE IDENTIFYING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW OF GDOT BRIDGE NO. 027-00268X-00678N BRIDGE PLATE IDENTIFYING COUNTY COMMISSIONERS AT THE TIME OF CONSTRUCTION. - GDOT Bridge No. 027-00268X-00678N, County Road 268-Empress Road span Piscola Creek, Quitman, Brooks County, GA

  20. 38. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photographic copy of historic construction drawing, ink on linen, February 1902 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Re- flooring and re-paving of Selby Avenue Bridge over tracks of Chicago, Milwaukee & St. Paul RY. CO. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  1. Rapid bridge construction technology : precast elements for substructures.

    DOT National Transportation Integrated Search

    2011-06-01

    The goal of this research was to propose an alternate system of precast bridge substructures which can : substitute for conventional cast in place systems in Wisconsin to achieve accelerated construction. : Three types of abutment modules (hollow wal...

  2. Flexural anchorage performance at diagonal crack locations.

    DOT National Transportation Integrated Search

    2010-12-01

    Large numbers of reinforced concrete deck girder bridges that were constructed during the interstate system expansion of the 1950s have developed diagonal cracking in the stems. Though compliant with design codes when constructed, many of these bridg...

  3. Evaluation of the composite wing girder bridge at Bear Creek.

    DOT National Transportation Integrated Search

    1984-11-01

    This report documents the construction monitoring and subsequent field testing : to evaluate the performance of an innovative nloose-fit" composite post-tensioned : concrete wing girder bridge constructed over Bear Creek, south of Austin, Texas. : Th...

  4. 58. Photographic copy of original construction plan (St. Paul Engineer's ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. Photographic copy of original construction plan (St. Paul Engineer's Office, Wabasha St. Bridge, Plan of Masonry, February 1899); south abutment - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN

  5. Field evaluation of hybrid-composite girder bridges in Missouri.

    DOT National Transportation Integrated Search

    2014-08-01

    Three hybrid composite beam (HCB) bridges were recently constructed in Missouri, USA. HCB is an innovative idea that incorporates traditional construction materials (steel and concrete) with fiber reinforced polymer (FRP) composites in such a manner ...

  6. A magnetic flux leakage and magnetostrictive guided wave hybrid transducer for detecting bridge cables.

    PubMed

    Xu, Jiang; Wu, Xinjun; Cheng, Cheng; Ben, Anran

    2012-01-01

    Condition assessment of cables has gained considerable attention for the bridge safety. A magnetic flux leakage and magnetostrictive guided wave hybrid transducer is provided to inspect bridge cables. The similarities and differences between the two methods are investigated. The hybrid transducer for bridge cables consists of an aluminum framework, climbing modules, embedded magnetizers and a ribbon coil. The static axial magnetic field provided by the magnetizers meets the needs of the magnetic flux leakage testing and the magnetostrictive guided wave testing. The magnetizers also provide the attraction for the climbing modules. In the magnetic flux leakage testing for the free length of cable, the coil induces the axial leakage magnetic field. In the magnetostrictive guided wave testing for the anchorage zone, the coil provides a pulse high power variational magnetic field for generating guided waves; the coil induces the magnetic field variation for receiving guided waves. The experimental results show that the transducer with the corresponding inspection system could be applied to detect the broken wires in the free length and in the anchorage zone of bridge cables.

  7. A Magnetic Flux Leakage and Magnetostrictive Guided Wave Hybrid Transducer for Detecting Bridge Cables

    PubMed Central

    Xu, Jiang; Wu, Xinjun; Cheng, Cheng; Ben, Anran

    2012-01-01

    Condition assessment of cables has gained considerable attention for the bridge safety. A magnetic flux leakage and magnetostrictive guided wave hybrid transducer is provided to inspect bridge cables. The similarities and differences between the two methods are investigated. The hybrid transducer for bridge cables consists of an aluminum framework, climbing modules, embedded magnetizers and a ribbon coil. The static axial magnetic field provided by the magnetizers meets the needs of the magnetic flux leakage testing and the magnetostrictive guided wave testing. The magnetizers also provide the attraction for the climbing modules. In the magnetic flux leakage testing for the free length of cable, the coil induces the axial leakage magnetic field. In the magnetostrictive guided wave testing for the anchorage zone, the coil provides a pulse high power variational magnetic field for generating guided waves; the coil induces the magnetic field variation for receiving guided waves. The experimental results show that the transducer with the corresponding inspection system could be applied to detect the broken wires in the free length and in the anchorage zone of bridge cables. PMID:22368483

  8. Development of a guideline for estimating tsunami forces On bridge superstructures.

    DOT National Transportation Integrated Search

    2011-10-01

    "The Pacific Northwest is vulnerable to seismic events in the Cascadia Subduction Zone (CSZ) that could generate a : large tsunami that could devastate coastal infrastructure such as bridges. In this context, this paper describes the : development of...

  9. The key quality control technology of main cable erection in long-span suspension bridge construction

    NASA Astrophysics Data System (ADS)

    Chen, Yongrui; Wei, Wei; Dai, Jie

    2017-04-01

    Main cable is one of the most important structure of suspension Bridges, which bear all the dead and live load from upper structure. Cable erection is one of the most critical process in suspension bridge construction. Key points about strand erection are studied in this paper, including strand traction, lateral movement, section adjustment, placing into saddle, anchoring, line shape adjustment and keeping, and tension control. The technology has helped a long-span suspension bridge in Yunnan Province, China get a ideal finished state.

  10. Arch-Axis Coefficient Optimization of Long-Span Deck-Type Concrete-Filled Steel Tubular Arch Bridge

    NASA Astrophysics Data System (ADS)

    Liu, Q. J.; Wan, S.; Liu, H. C.

    2017-11-01

    This paper is based on Nanpuxi super major bridge which is under construction and starts from Wencheng Zhejiang province to Taishun highway. A finite element model of the whole bridge is constructed using Midas Civil finite element software. The most adverse load combination in the specification is taken into consideration to determine the method of calculating the arch-axis coefficient of long-span deck-type concrete-filled steel tubular arch bridge. By doing this, this paper aims at providing references for similar engineering projects.

  11. 77 FR 44463 - Safety Zone, Atlantic Intracoastal Waterway; Emerald Isle, NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ... 1625-AA00 Safety Zone, Atlantic Intracoastal Waterway; Emerald Isle, NC AGENCY: Coast Guard, DHS... waters of the Atlantic Intracoastal Waterway at Emerald Isle, North Carolina. The safety zone is... Bridge crossing the Atlantic Intracoastal Waterway, mile 226, at Emerald Isle, North Carolina. The safety...

  12. 77 FR 64906 - Safety Zone, Atlantic Intracoastal Waterway; Emerald Isle, NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ... 1625-AA00 Safety Zone, Atlantic Intracoastal Waterway; Emerald Isle, NC AGENCY: Coast Guard, DHS... zone on the waters of the Atlantic Intracoastal Waterway at Emerald Isle, North Carolina. The safety... NC 58 Fixed Bridge crossing the Atlantic Intracoastal Waterway, mile 226, at Emerald Isle, North...

  13. 77 FR 57063 - Safety Zone, Atlantic Intracoastal Waterway; Emerald Isle, NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-17

    ... 1625-AA00 Safety Zone, Atlantic Intracoastal Waterway; Emerald Isle, NC AGENCY: Coast Guard, DHS... zone on the waters of the Atlantic Intracoastal Waterway at Emerald Isle, North Carolina. The safety... NC 58 Fixed Bridge crossing the Atlantic Intracoastal Waterway, mile 226, at Emerald Isle, North...

  14. 78 FR 56605 - Drawbridge Operation Regulation; Lafourche Bayou, Larose, LA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... reference to the SR 310 (Larose Pontoon) Bridge with the LA 657 (Larose) Vertical Lift Bridge. The SR 310...) Vertical Lift Bridge, which is located approximately one-half mile away from the old bridge. The old SR 310....1. This bridge has been replaced by the newly constructed LA 657 (Larose) Vertical Lift Bridge...

  15. Long-term behavior of integral abutment bridges : [technical summary].

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment bridges, a type of jointless bridge, are the construction option of choice when designing highway bridges in many parts of the country. Rather than providing an expansion joint to separate the substructure from the superstructure to...

  16. Seismic retrofit of spliced sleeve connections for precast bridge piers.

    DOT National Transportation Integrated Search

    2017-03-01

    Grouted Splice Sleeve (GSS) connectors are being considered for connecting bridge columns, footings, and pier caps in Accelerated Bridge Construction (ABC). A repair technique for precast reinforced concrete bridge column-to-footing and column-to-pie...

  17. 25 CFR 170.507 - Who reviews bridge inspection reports?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Who reviews bridge inspection reports? 170.507 Section... ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Bridge Inspection § 170.507 Who reviews bridge inspection reports? The person responsible for the bridge inspection...

  18. Reliability Modeling of Double Beam Bridge Crane

    NASA Astrophysics Data System (ADS)

    Han, Zhu; Tong, Yifei; Luan, Jiahui; Xiangdong, Li

    2018-05-01

    This paper briefly described the structure of double beam bridge crane and the basic parameters of double beam bridge crane are defined. According to the structure and system division of double beam bridge crane, the reliability architecture of double beam bridge crane system is proposed, and the reliability mathematical model is constructed.

  19. Geotextile reinforced bridge approach embankment : Lake River Bridge : Malin Highway , Klamath County, Oregon : construction report.

    DOT National Transportation Integrated Search

    1993-03-01

    The transition from the roadway to the deck of a rigidly supported bridge is of concern to engineers and the travelling public. It is a common occurrence to feel a discontinuity between the roadway and bridge structure. Bridge engineers have tried to...

  20. A study of girder deflections during bridge deck construction : final report.

    DOT National Transportation Integrated Search

    1971-01-01

    Problems involved in obtaining the desired thickness of bridge decks were investigated. The study, which was limited to decks which were longitudinally screeded during construction, included (1) field measurements of the girder deflections during con...

  1. Flexural anchorage performance at diagonal crack locations : final report.

    DOT National Transportation Integrated Search

    2010-12-01

    Large numbers of reinforced concrete deck girder bridges that were constructed during the interstate system expansion of the 1950s have developed diagonal cracking in the stems. Though compliant with design codes when constructed, many of these bridg...

  2. Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects

    DOT National Transportation Integrated Search

    1996-01-01

    These standard specifications were issued primarily for constructing roads and bridges on Federal Highway projects under the direct administration of the Federal Highway Administration. These specifications are cited as "FP-96" indicating Standard Sp...

  3. Field evaluation of hybrid\\0x2010composite girder bridges in Missouri.

    DOT National Transportation Integrated Search

    2014-06-01

    Three hybrid composite beam (HCB) bridges were recently constructed in Missouri, USA. HCB is an innovative idea : that incorporates traditional construction materials (steel and concrete) with fiber reinforced polymer (FRP) composites : in such a man...

  4. 3D laser scanning for quality control and assurance in bridge deck construction.

    DOT National Transportation Integrated Search

    2014-08-01

    The inspection of installations of rebar and other embedded components in bridge deck construction is a tedious : task for eld inspectors, requiring considerable eld time for measurement and verication against code requirement. The verica...

  5. Detailed seismic evaluation of bridges along I-24 in Western Kentucky.

    DOT National Transportation Integrated Search

    2006-09-01

    This report presents a seismic rating system and a detailed evaluation procedure for selected highway bridges on/over I-24 in Western Kentucky near the New Madrid Seismic Zone (MNSZ). The rating system, based upon structural vulnerability, seismic an...

  6. Evaluation of cracking of the US 331 bridge deck.

    DOT National Transportation Integrated Search

    2010-08-01

    The focus of this report is a three-span, continuous, skewed bridge that was constructed in the : summer of 2003 as the northbound roadway bridge on US 331 in Montgomery County, : Alabama. This bridge deck exhibited extensive transverse and horizonta...

  7. Structural monitoring of Rigolets Pass Bridge : LTRC technical summary report 437.

    DOT National Transportation Integrated Search

    2009-09-01

    The Louisiana Department of Transportation and Development (LADOTD) has been gradually : introducing high performance concrete (HPC) into their bridge construction programs. The : Rigolets Pass Bridge is a 62-span bridge with a total length of 5,489 ...

  8. Research notes : soil nailing of a bridge fill embankment.

    DOT National Transportation Integrated Search

    1991-11-01

    A recent construction project involved widening and lowering the grade of the Swift Highway under the south end of the Oregon Slough Bridge approximately seven miles north of Portland. This project included construction of the first permanent soil na...

  9. A literature survey on industrialized bridge construction.

    DOT National Transportation Integrated Search

    1972-01-01

    The purpose of this survey was to aid the writer in understanding and retaining material in preparation for a project on the industrialization of bridge construction. However, it was believed that the results of the survey would be informative to oth...

  10. Feasibility of using high-strength steel and MMFX rebar in bridge design.

    DOT National Transportation Integrated Search

    2009-07-01

    Pressed by increases in construction costs coupled with insufficient funding for maintenance and new construction, many state and federal agencies are now specifying a service life of 75 years for all concrete bridges without significant repairs. In ...

  11. An industrialized construction approach to concrete superstructures for bridges.

    DOT National Transportation Integrated Search

    1974-01-01

    The objective of this study was to develop drawings for a specific site or sites that incorporated the best concepts of industrialized bridge superstructure construction, that is, great emphasis was placed upon the use of modular design and assembly ...

  12. Construction of bridge decks with precast prestressed deck planks

    DOT National Transportation Integrated Search

    2002-04-01

    The purpose of this paper is to discuss the construction and early performance of two 1999 - 2000 bridge deck replacement state contracts in Illinois that included precast, prestressed concrete (PPC) deck planks. Metal stay-in-place forms used in one...

  13. Latex-modified fiber-reinforced concrete bridge deck overlay : construction/interim report.

    DOT National Transportation Integrated Search

    1993-06-01

    Latex-modified concrete (LMC) is Portland cement concrete (PCC) with an admixture of latex. LMC is considered to be nearly impermeable to chlorides and is extensively used to construct bridge deck overlays. Unfortunately, some of these overlays have ...

  14. Bridge-in-a-Backpack(TM). Task 4 : monitoring and load rating.

    DOT National Transportation Integrated Search

    2015-01-01

    Five bridges were constructed utilizing UMaines hybrid composite arch technology as part of the Maine : Department of Transportations Composites Initiative. Three were constructed in 2010, one in 2011 and the final : one in 2012. The designs fo...

  15. Laboratory investigation of grouted coupler connection details for ABC bridge projects : [tech transfer summary].

    DOT National Transportation Integrated Search

    2015-08-01

    Advancements and increased use of accelerated bridge construction (ABC) : often result in the use of newly developed, or modified, technologies and/or : construction techniques that are sometimes untested in this new application. : For designers and ...

  16. Aerial view of the entire bridge crossing the Tennessee River ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Aerial view of the entire bridge crossing the Tennessee River looking up river. The swing bridge, when open, permits river navigational traffic to ply the river. Construction of a replacement bridge, to be located 93.27 feet down river, has now started. - Bridgeport Swing Span Bridge, Spanning Tennessee River, Bridgeport, Jackson County, AL

  17. Ecological estimation of the possible variants new Ukrainian shipping way between the Danube and the Black Sea

    NASA Astrophysics Data System (ADS)

    Berlinsky, N.

    2007-05-01

    The better way or optimal variant means economic advisability of organization and using the way and the same time minimization of anthropogenic press. The first problem's factor is - all kinds' variants cross the area of the Danube Biosphere Reserve. The next factor is - all kinds of variants need dredging works in the sea shallow water so called bar's zone for marine entrance channel. As for natural factors there are also two. The first one is a long term delta evolution and the second is the process of water discharge redistribution. If the human influence to the first factor is still limited the second factor's influence can be unlimited - it is easy to do by jetty or dams construction. At present there are nine possible variants of the DWW: Variant 1. It is an artificial canal built as an ameliorative at 80-s between the Danube and Sasik liman. It provokes the water discharge redistribution up on 16.6% from the Danube run off (from the total Q=3000 m3/c for 54 km), hydrological regime in Ukrainian delta and ecological conditions will be sharply worsened. This project supposed a giant dredging works. Variant 2. The Project of engineer P.S. Chekhovich (1904). The length of the canal is 10 km. (The problems are: it is an artificial canal, needs the bridge, cross the wetlands area, redistribute water discharge from the Danube). Variant 3. Solomonov branch - Zhebryany bay modern Project by engineer V.P. Zizak (2000), The problems are: it is an artificial canal also, but with locks, needs the bridge, to cross the wetlands area, the water discharge redistribution from the Danube up on 2.27% (from the total Q=3000 m3/c for 54 km). The length of the canal is 9 km. Two last variants have orientation from Solomonov arm to Zhebriany bay. The other variants of DWW linked with Ochakovsky and Starostambulsky arms systems. Ochakosky system is dying off system from geological point of view. There are two arms which can be examined for DWW - Prorva arm and Potapovo arm. Besides, Ochakovska system needs dykes along both of shores but its construction may have strong influence on ecosystem. The second variant in this system is Potapovo DWW. So, all problems with dyke constructions are continuing besides this DWW passes through the one of the Strict Protection UNESCO zone in Biosphere Reserve, so call iadro. For fundamental reconstruction of Ochakovska system it is necessary to redistribute water discharge in the inner delta. It means to construct the dam in Starostambulsky system and redistribute water to Ochakovska system. In this case ecological situation in Starostambulsky system will be catastrophic. Hydrology regime modification influences the animal and plant kingdom. In the Starostambulsy mouth there is also the Strict Protection UNESCO zone in Biosphere Reserve. All kinds of alternative variants of DWW are dangerous for ecological condition of Chilia delta because considerable part of fresh water will be withdrawn from Ukrainian part of delta (upper 20 km) and it will provoke degradation of living condition for water plants and animals in the delta and Biosphere reserve including. The other Projects are directly linked with strong influence on the zones under strict protection (UNESCO) in the Danube Biosphere reserve. So, safest project is Bystryy DWW, because its conditions created by nature itself and don't need additional artificial constructions. Ukrainian DWW in Starostambulsky arm can be the reason of ecological and economic problems for Romanian side (silting of Sulina DWW).

  18. Interlaced zone plate optics for hard X-ray imaging in the 10 nm range

    DOE PAGES

    Mohacsi, Istvan; Vartiainen, Ismo; Rosner, Benedikt; ...

    2017-03-08

    Multi-keV X-ray microscopy has been particularly successful in bridging the resolution gap between optical and electron microscopy. However, resolutions below 20 nm are still considered challenging, as high throughput direct imaging methods are limited by the availability of suitable optical elements. In order to bridge this gap, we present a new type of Fresnel zone plate lenses aimed at the sub-20 and the sub-10 nm resolution range. By extending the concept of double-sided zone plate stacking, we demonstrate the doubling of the effective line density and thus the resolution and provide large aperture, single- chip optical devices with 15 andmore » 7 nm smallest zone widths. The detailed characterization of these lenses shows excellent optical properties with focal spots down to 7.8 nm. Furthermore, beyond wave front characterization, the zone plates also excel in typical imaging scenarios, verifying their resolution close to their diffraction limited optical performance.« less

  19. Interlaced zone plate optics for hard X-ray imaging in the 10 nm range

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mohacsi, Istvan; Vartiainen, Ismo; Rosner, Benedikt

    Multi-keV X-ray microscopy has been particularly successful in bridging the resolution gap between optical and electron microscopy. However, resolutions below 20 nm are still considered challenging, as high throughput direct imaging methods are limited by the availability of suitable optical elements. In order to bridge this gap, we present a new type of Fresnel zone plate lenses aimed at the sub-20 and the sub-10 nm resolution range. By extending the concept of double-sided zone plate stacking, we demonstrate the doubling of the effective line density and thus the resolution and provide large aperture, single- chip optical devices with 15 andmore » 7 nm smallest zone widths. The detailed characterization of these lenses shows excellent optical properties with focal spots down to 7.8 nm. Furthermore, beyond wave front characterization, the zone plates also excel in typical imaging scenarios, verifying their resolution close to their diffraction limited optical performance.« less

  20. Interlaced zone plate optics for hard X-ray imaging in the 10 nm range

    PubMed Central

    Mohacsi, Istvan; Vartiainen, Ismo; Rösner, Benedikt; Guizar-Sicairos, Manuel; Guzenko, Vitaliy A.; McNulty, Ian; Winarski, Robert; Holt, Martin V.; David, Christian

    2017-01-01

    Multi-keV X-ray microscopy has been particularly successful in bridging the resolution gap between optical and electron microscopy. However, resolutions below 20 nm are still considered challenging, as high throughput direct imaging methods are limited by the availability of suitable optical elements. In order to bridge this gap, we present a new type of Fresnel zone plate lenses aimed at the sub-20 and the sub-10 nm resolution range. By extending the concept of double-sided zone plate stacking, we demonstrate the doubling of the effective line density and thus the resolution and provide large aperture, singlechip optical devices with 15 and 7 nm smallest zone widths. The detailed characterization of these lenses shows excellent optical properties with focal spots down to 7.8 nm. Beyond wave front characterization, the zone plates also excel in typical imaging scenarios, verifying their resolution close to their diffraction limited optical performance.

  1. Interlaced zone plate optics for hard X-ray imaging in the 10 nm range

    NASA Astrophysics Data System (ADS)

    Mohacsi, Istvan; Vartiainen, Ismo; Rösner, Benedikt; Guizar-Sicairos, Manuel; Guzenko, Vitaliy A.; McNulty, Ian; Winarski, Robert; Holt, Martin V.; David, Christian

    2017-03-01

    Multi-keV X-ray microscopy has been particularly successful in bridging the resolution gap between optical and electron microscopy. However, resolutions below 20 nm are still considered challenging, as high throughput direct imaging methods are limited by the availability of suitable optical elements. In order to bridge this gap, we present a new type of Fresnel zone plate lenses aimed at the sub-20 and the sub-10 nm resolution range. By extending the concept of double-sided zone plate stacking, we demonstrate the doubling of the effective line density and thus the resolution and provide large aperture, singlechip optical devices with 15 and 7 nm smallest zone widths. The detailed characterization of these lenses shows excellent optical properties with focal spots down to 7.8 nm. Beyond wave front characterization, the zone plates also excel in typical imaging scenarios, verifying their resolution close to their diffraction limited optical performance.

  2. Field performance of timber bridges. 4, Graves Crossing stress-laminated deck bridge

    Treesearch

    J. P. Wacker; M. A. Ritter

    The Graves Crossing bridge was constructed October 1991 in Antrim County, Michigan, as part of the demonstration timber bridge program sponsored by the USDA Forest Service. The bridge is a two-span continuous, stress-laminated deck superstructure and it is 36-ft long and 26-ft wide. The bridge is one of the first stress-laminated deck bridges to be built of sawn lumber...

  3. Laboratory investigation of grouted coupler connection details for ABC bridge projects.

    DOT National Transportation Integrated Search

    2015-08-01

    With an ever increasing desire to utilize accelerated bridge construction (ABC) techniques, it is becoming critical that bridge : designers and contractors have confidence in typical details. The Keg Creek Bridge on US 6 in Iowa was a recent ABC exam...

  4. 21. c, 1915 Historic plan, standard 2 beam girder bridge. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. c, 1915 Historic plan, standard 2 beam girder bridge. United Construction Company, Albany, New York. Generic plan typical of Prescott Bridge. Source: New Hampshire Department of Transportation - Prescott Bridge, Spanning Lamprey River on Prescott Road, Raymond, Rockingham County, NH

  5. NHDOT : process for municipally-managed state bridge aid program projects

    DOT National Transportation Integrated Search

    2007-09-12

    The document sets for the requirements for a municipality which to manage the design and construction of a bridge rehabilitation or replacement project and receive Bridge Aid under the applicable provisions of RSA 234. Bridge Aid provided to a Munici...

  6. Evaluation of a highway bridge constructed using high strength lightweight concrete bridge girders.

    DOT National Transportation Integrated Search

    2011-04-01

    The purpose of this research was to characterize the performance of High Strength Lightweight Concrete (HSLW) in precast, prestressed bridge girders and to evaluate their performance in a highway bridge. The mechanical properties and long-term time-d...

  7. Percolation study for the capillary ascent of a liquid through a granular soil

    NASA Astrophysics Data System (ADS)

    Cárdenas-Barrantes, Manuel Antonio; Muñoz, José Daniel; Araujo, Nuno Machado

    2017-06-01

    Capillary rise plays a crucial role in the construction of road embankments in flood zones, where hydrophobic compounds are added to the soil to suppress the rising of water and avoid possible damage of the pavement. Water rises through liquid bridges, menisci and trimers, whose width and connectivity depends on the maximal half-length λ of the capillary bridges among grains. Low λs generate a disconnect structure, with small clusters everywhere. On the contrary, for high λ, create a percolating cluster of trimers and enclosed volumes that form a natural path for capillary rise. Hereby, we study the percolation transition of this geometric structure as a function of λ on a granular media of monodisperse spheres in a random close packing. We determine both the percolating threshold λc = (0.049 ± 0.004)R (with R the radius of the granular spheres), and the critical exponent of the correlation length v = 0.830 ± 0.051, suggesting that the percolation transition falls into the universality class of ordinary percolation.

  8. Cane Creek flood-flow characteristics at State Route 30 near Spencer, Tennessee

    USGS Publications Warehouse

    Gamble, Charles R.

    1983-01-01

    The Tennessee Department of Transportation has constructed a new bridge and approaches on State Route 30 over Cane Creek near Spencer, Tennessee. The old bridge and its approaches were fairly low, permitting considerable flow over the road during high floods. The new bridge and its approaches are considerably higher, causing different flow conditions at the site. Analysis of the effects of the new bridge, as compared to the old bridge, on floods of the magnitude of the May 27, 1973, flood is presented. The May 27, 1973, flood was greater than a 100-year flood. Analysis of the 50- and 100-year floods for the new bridge are also presented. Results of the study indicate that the new construction will increase the water-surface elevation for a flood equal to the May 27, 1973, flood by approximately 1 foot upstream from bridge. (USGS)

  9. 16. PHOTOCOPY OF HISTORIC VIEW, HALFTONE PLATE DEPICTING CONSTRUCTION OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. PHOTOCOPY OF HISTORIC VIEW, HALF-TONE PLATE DEPICTING CONSTRUCTION OF BOSTON STREET BRIDGE, DATED DECEMBER 21, 1901, AND SHOWING CONCENTRIC RING OR ROWLOCK BOND CONSTRUCTION TECHNIQUE (HALF-TONE PLATE PUBLISHED IN BALTIMORE CITY ENGINEER'S ANNUAL REPORT FOR 1901, COURTESY ENOCH PRATT FREE LIBRARY) - Boston Street Bridge, Spanning Harris Creek Sewer at Boston Street, Baltimore, Independent City, MD

  10. 76 FR 38018 - Safety Zone, Newport River; Morehead City, NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ...-AA00 Safety Zone, Newport River; Morehead City, NC AGENCY: Coast Guard, DHS. ACTION: Temporary final... the main span US 70/Morehead City-Newport River high rise bridge in Carteret County, NC. This safety...) entitled Safety Zone, Newport River; Morehead City, North Carolina in the Federal Register (33 FR 165). We...

  11. 76 FR 29645 - Safety Zone, Newport River; Morehead City, NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ...-AA00 Safety Zone, Newport River; Morehead City, NC AGENCY: Coast Guard, DHS. ACTION: Temporary final... the main span US 70/Morehead City--Newport River high rise bridge in Carteret County, NC. This safety... Zone, Newport River; Morehead City, North Carolina in the Federal Register (33 FR 165). We received no...

  12. 76 FR 37000 - Seattle Seafair Unlimited Hydroplane Race

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... area; the waters of Lake Washington bounded by the Interstate 90 (Mercer Island/Lacey V. Murrow) Bridge... along the shoreline of Mercer Island. The regulated area has been divided into two zones. The zones are... race course and then to the northerly tip of Ohlers Island in Andrews Bay. The western zone is...

  13. Carbon Fiber Reinforced Polymer Grids for Shear and End Zone Reinforcement in Bridge Beams

    DOT National Transportation Integrated Search

    2018-01-01

    Corrosion of reinforcing steel reduces life spans of bridges throughout the United States; therefore, using non-corroding carbon fiber reinforced polymer (CFRP) reinforcement is seen as a way to increase service life. The use of CFRP as the flexural ...

  14. 77 FR 70681 - Special Local Regulations; 2012 Holiday Boat Parades, Captain of the Port Miami Zone; FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ... east of the Glynn Mayo Highway Bridge in Jupiter, FL. A special local regulation was previously... Palm Beach and end at Loxahatchee River Daymark 7 east of the Glynn Mayo Highway Bridge in Jupiter, FL...

  15. A novel methodology for quantifying the performance of constructed bridges in cold regions.

    DOT National Transportation Integrated Search

    2014-04-01

    This report presents a two-part research program examining the performance of constructed bridges in a : cold region, represented by those in the State of North Dakota, and the behavior of concrete members : strengthened with carbon fiber reinforced ...

  16. Stress-corrosion susceptibility of highway bridge construction steels. Phase I

    DOT National Transportation Integrated Search

    1972-04-01

    A catalog of steels used in highway bridge construction has been developed. A state-of-the-art survey on the stress-corrosion susceptibility of these steels has been conducted. The types and concentrations of corrosives that can be experienced in the...

  17. Distribution factors for construction loads and girder capacity equations [project summary].

    DOT National Transportation Integrated Search

    2017-03-01

    This project focused on the use of Florida I-beams (FIBs) in bridge construction. University of Florida researchers used analytical models and finite element analysis to update equations used in the design of bridges using FIBs. They were particularl...

  18. Long-term behavior of integral abutment bridges : appendix D, Bowen lab soil borings.

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment (IA) construction has become the preferred method over conventional construction for use with typical highway bridges. However, the use of these structures is limited due to state mandated length and skew limitations. To expand thei...

  19. 2. HISTORIC PHOTOGRAPH, MERRITT PARKWAY UNDER CONSTRUCTION,LOOKING WEST TO ROUND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. HISTORIC PHOTOGRAPH, MERRITT PARKWAY UNDER CONSTRUCTION,LOOKING WEST TO ROUND HILL ROAD BRIDGE, CA. 1936. COLLECTION OF GEORGE L. LARNED. - Merritt Parkway, Round Hill Road Bridge, Spanning Merritt Parkway at 3.5 mile mark, Greenwich, Fairfield County, CT

  20. Simple analysis of the effect of construction materials on bridge impact factors

    DOT National Transportation Integrated Search

    1999-06-01

    The purpose of this research is to study the influence of different construction materials on the dynamic impact factor of bridges. Initially, introduction of the dynamic impact factor and some evaluation methods are presented. A comparison of the re...

  1. Integument cell differentiation in dandelions (Taraxacum, Asteraceae, Lactuceae) with special attention paid to plasmodesmata.

    PubMed

    Płachno, Bartosz J; Kurczyńska, Ewa; Świątek, Piotr

    2016-09-01

    The aim of the paper is to determine what happens with plasmodesmata when mucilage is secreted into the periplasmic space in plant cells. Ultrastructural analysis of the periendothelial zone mucilage cells was performed on examples of the ovule tissues of several sexual and apomictic Taraxacum species. The cytoplasm of the periendothelial zone cells was dense, filled by numerous organelles and profiles of rough endoplasmic reticulum and active Golgi dictyosomes with vesicles that contained fibrillar material. At the beginning of the differentiation process of the periendothelial zone, the cells were connected by primary plasmodesmata. However, during the differentiation and the thickening of the cell walls (mucilage deposition), the plasmodesmata become elongated and associated with cytoplasmic bridges. The cytoplasmic bridges may connect the protoplast to the plasmodesmata through the mucilage layers in order to maintain cell-to-cell communication during the differentiation of the periendothelial zone cells.

  2. Geotextile reinforced bridge approach embankment : Lake River Bridge - Malin Highway , Klamath County, Oregon : final report.

    DOT National Transportation Integrated Search

    1997-08-01

    An experimental construction method was evaluated at the Lost River Bridge in Klamath County to reduce the discontinuity between the bridge and the roadway. The method included combining soil in six 300-mm lifts interlaced with geotextile reinforceme...

  3. Use of innovative concrete mixes for improved constructability and sustainability of bridge decks.

    DOT National Transportation Integrated Search

    2013-11-01

    Bridge deck crack surveys were performed on twelve bridges on US-59 south of Lawrence, Kansas, to determine the effects of : mixture proportions, concrete properties, deck type, and girder type on the crack density of reinforced concrete bridge decks...

  4. "Bridge #6 Rock Creek: Castiron 48" pipe lines to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    "Bridge #6 - Rock Creek: Cast-iron 48" pipe lines to Gravity - 1859." Construction photo of Pennsylvania Avenue Bridge, 1859. Photograph courtesy Washington Aqueduct Division, U.S. Army Corps of Engineers - Pennsylvania Avenue Bridge, Spanning Rock Creek & Potomac Parkway, Washington, District of Columbia, DC

  5. 3. DEADWOOD CREEK BRIDGE, VIEW BELOW DECK SHOWING OPEN SPANDREL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. DEADWOOD CREEK BRIDGE, VIEW BELOW DECK SHOWING OPEN SPANDREL ARCH CONSTRUCTION AND ARCH RIBS - Deadwood Creek Bridge, Spanning Deadwood Creek on Mather Memorial Parkway, Longmire, Pierce County, WA

  6. Monitoring of a concrete arch bridge during construction

    NASA Astrophysics Data System (ADS)

    Inaudi, Daniele; Ruefenacht, A.; von Arx, B.; Noher, H. P.; Vurpillot, Samuel; Glisic, Branko

    2002-06-01

    The Siggenthal Bridge is a concrete arch bridge with an arch span of 117 m, being built over the Limmat River in Baden, Switzerland. This bridge has been instrumented with 58 long- gage SOFO fiber optic deformation sensors, 2 inclinometers and 8 temperature sensors to monitor its deformations, curvatures and displacements during construction and int eh long-term. The sensor have been built installed successfully and the arch was monitored during the removal of the formwork and supports. It was therefore possible to observe the deformations of the arch wen being loaded by its dead load and by the daily temperature fluctuations. The measurements have shown that the temperature changes produce deformations of the same order of magnitude as the dead loads. The out-of-plain displacements obtained by double- integration of the measured curvatures are in good agreement with the direct triangulation measurements. Monitoring was also carried out during the construction of the superstructure, with the associated change of the load distribution in the arch. This paper briefly introduces the functional principle of the long-gage sensors used in this application, illustrates their installation and discusses the measurement results obtained during the bridge construction.

  7. A novel methodology for quantifying the performance of constructed bridges in cold regions : [project brief].

    DOT National Transportation Integrated Search

    2014-04-01

    This report presents a two-part research program examining the performance of constructed : bridges in a cold region, represented by those in the State of North Dakota, and the behavior of : concrete members strengthened with carbon fiber reinforced ...

  8. First bridge structure with lightweight high-performance concrete beams and deck in Virginia.

    DOT National Transportation Integrated Search

    2005-01-01

    This study involved the construction and early performance of the first bridge in Virginia constructed with lightweight high-performance concrete (LWHPC) having a density of 120 lb/ft3 in the beams and deck. The design strength and permeability were ...

  9. Long-term behavior of integral abutment bridges : appendix C, US231 over railroad spur soil borings.

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment (IA) construction has become the preferred method over conventional construction for use with typical highway bridges. However, the use of these structures is limited due to state mandated length and skew limitations. To expand thei...

  10. Feasibility evaluation of utilizing high-strength concrete in design and construction of highway bridge structures.

    DOT National Transportation Integrated Search

    1994-01-01

    The objective of this investigation was to evaluate the feasibility of using high-strength concrete in the design and construction of highway bridge structures. A literature search was conducted; a survey of five regional fabrication plants was perfo...

  11. Underwater acoustic noise generation and propagation resulting from pile driving for Oregon bridge construction.

    DOT National Transportation Integrated Search

    2014-06-01

    There is growing concern about noise levels from pile driving activities associated with the : construction of highway bridges and other in-water structures. It has been demonstrated that noise : generated from pile driving with an impact hammer can ...

  12. On the Onset of Thermocapillary Convection in a Liquid bridge

    NASA Astrophysics Data System (ADS)

    Shukla, Kedar

    Thermo capillary convection refers to motion driven by the application of a temperature gradient along the interface. The temperature gradient may be large enough to cause oscillations in the basic state of the fluid. The vast majority of the liquid bridge investigations performed aboard on the sounding rockets or the space shuttles [1, 2] focused on the float zone processes because the process has been regarded as a candidate for the space based manufacturing of semiconductor materials. Although the buoyancy effect is avoided in the floating zone techniques during space operation, it experiences surface tension driven convection initiated by the temperature gradient along the free surface of the zone [3]. The appearance of the oscillatory thermo capillary convection couples with the solidification processes leads to the striations and results into the degradation of the crystals [4, 5]. The half zone consists of the liquid bridge held between two solid, planar end walls across which a temperature gradient is applied. Thus the basic state of thermo capillary convection consists of a single toroidal roll with the surface motion directed downwards from the hot upper disc to the cold lower one. Bennacer et al [6] studied how different axial profiles of the heat flux affect the flow patterns and transition from ax symmetric steady to ax symmetric oscillatory flow. The three dimensional instability of liquid bridges located between isothermal differentially heated disks were studied by several authors [7-14]. The interface deformation caused by the gravity jitters depends on the volume of the liquid bridge and cause changes in the physical properties of the liquid, which ultimately influence the basic state of the fluid [15-16]. The paper discusses Marangoni convection in a liquid bridge subject to g-jitters in a micro gravity environment. The parametric excitement of the liquid bridge with surface tension variation along with the free surface is considered. We will follow the method of Shukla [17] for Boussinesq flow to model the convective instability in an axisymmetric flow in the liquid bridge. The surface deformation caused by g-jitters and its effects on the onset of oscillatory flow will be examined. References: [1] Grodzka, P.G. and Bannister, T.C., Heat flow and convection demonstration experiments abord Appolo 14, Science (Washington, D.C.), Vol.176, May 1972, pp. 506-508. [2] Bannister, T C., etal, NASA, TMX-64772, 1973. [3] Shukla, K.N. Hydrodynamics of Diffusive Processes, Applied Mechanics Review, Vol.54, No.5, 2001, pp. 391-404. [4] Chen, G., Lizee, A., Roux, B.,, Bifurcation analysis of the thermo capillary convection in cylindrical liquid bridge, J Crystal growth, Vol. 180, 1997, pp.638-647. [5] Imaishi, N., Yasuhiro, S., Akiyama, Y and Yoda, S., Numerical simulation of oscillatory Marangoni flow in half zone liquid bridge of low Prandtl number fluid, J., Crystal Growth, Vol. 230, 2001, pp. 164-171. [6] Bennacer, R., Mohamad, A.A., Leonardi, E., The effect o heat flux distribution on thermo capillary convection in a sideheated liquid bridge, Numer. Heat transfer, Part A, vol. 41, 2002, pp. 657-671. [7] Kuhlmann, H C., Rath, H J., Hydrodynamic instabilities in Cylindrical thermocapillary liquid bridges, J Fluid Mech., Vol. 247,1993, pp. 247-274. [8] Wanshura, M., Shevtsova, V M, Kuhlmann, H C and Rath, H J., Convective instability in thermocapillary liquid bridges, Phys. Fluids, Vol. 7, 1995, pp. 912-925. [9] Kasperski, G., Batoul, A., Labrosse, G., Up to the unsteadiness of axisymmetric thermocapillary low in a laterally heated liquid bridge, Phys. Fluids, Vol. 12, 2000, pp. 103-119. [10] Lappa, M., Savino, R., Monti, R., Three dimensional numerical simulation of Marangoni instabilities in non cylindrical liquid bridges in microgravity, Int. J Heat Mass Transfer, Vol. 44, 2001, pp. 1983-2003 [11] Zeng, Z, Mizuseki, H., Simamura, K., Fukud, T. Higashino, K, Kawaazoe, Y., Three dimensional oscillatory thermocapillary convection in liquid bridgeunder microgravity, Int. J heat Mass Transf., Vol. 44, 2001, pp. 3765-3774. [12] Kamotani, Y., Wang, L, Hatta, S., Wang, A., Yoda, S., Free surface heat loss effect on Oscillatory thermocapillary flow in a liquid bridges of high Prandtl number fluids, Int. J heat Mass Transfer, Vol. 46, 2003, pp. 3211-3220.

  13. 77 FR 64904 - Safety Zone, Atlantic Intracoastal Waterway; Carolina Beach, NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ... Bridge crossing the Atlantic Intracoastal Waterway, mile 295.6, at Carolina Beach, North Carolina. The... FR Federal Register NPRM Notice of Proposed Rulemaking A. Regulatory History and Information On... Purpose North Carolina Department of Transportation has awarded a contract to American Bridge Company of...

  14. 77 FR 66938 - Special Local Regulations; 2012 Holiday Boat Parades, Captain of the Port Miami Zone; FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... North Palm Beach and end at Loxahatchee River Daymark 7 east of the Glynn Mayo Highway Bridge in Jupiter... Loxahatchee River Daymark 7 east of the Glynn Mayo Highway Bridge in Jupiter, FL, which will include a buffer...

  15. INTERIOR OF WEST SPAN LOOKING WEST (SHADOW OF VERTICAL LAPS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR OF WEST SPAN LOOKING WEST (SHADOW OF VERTICAL LAPS PLACED ON ZONE III; ASPHALT ZONE IX) - Honey Run Bridge, Spanning Butte Creek, bypassed section of Honey Run Road (originally Carr Hill Road), Paradise, Butte County, CA

  16. Rapid construction of Pacific Street Bridge with o.7 inch strands.

    DOT National Transportation Integrated Search

    2010-10-01

    The Pacific Street Bridge over I-680 in Omaha, NE is the first bridge in the United States to use 0.7-in.-diameter prestressing : strands in pretensioned concrete girders. This project was funded by FHWA through NDOR under the Innovative Bridge Resea...

  17. Use of innovative concrete mixes for improved constructability and sustainability of bridge decks : [technical summary].

    DOT National Transportation Integrated Search

    2013-11-01

    Bridge deck crack surveys were performed on twelve bridges on US-59 south of Lawrence, Kansas, to determine the effects of mixture proportions, concrete properties, deck type, and girder type on the crack density of reinforced concrete bridge decks.

  18. 9. Photocopy of photograph original print located in collection of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photocopy of photograph original print located in collection of William H. Caruthers, Jr., Richmond, Virginia, and loaned by Susan A. Harter, Tempe, Arizona. Photographer assumed to be William H. Caruthers, Sr., assistant (construction) engineer for the Ash Avenue Bridge, 1912 VIEW OF ASH AVENUE BRIDGE UNDER CONSTRUCTION, LOOKING NORTH, SHOWING STEEL REINFORCEMENT IN DECK BEFORE PLACEMENT OF CONCRETE - Ash Avenue Bridge, Spanning Salt River at Foot of Ash Avenue, Tempe, Maricopa County, AZ

  19. The optimum tension for bridging sutures in transosseous-equivalent rotator cuff repair: a cadaveric biomechanical study.

    PubMed

    Park, Ji Soon; McGarry, Michelle H; Campbell, Sean T; Seo, Hyuk Jun; Lee, Yeon Soo; Kim, Sae Hoon; Lee, Thay Q; Oh, Joo Han

    2015-09-01

    Transosseous-equivalent (TOE) rotator cuff repair can increase contact area and contact pressure between the repaired cuff tendon and bony footprint and can show higher ultimate loads to failure and smaller gap formation compared with other repair techniques. However, it has been suggested that medial rotator cuff failure after TOE repair may result from increased bridging suture tension. To determine optimum bridging suture tension in TOE repair by evaluating footprint contact and construct failure characteristics at different tensions. Controlled laboratory study. A total of 18 fresh-frozen cadaveric shoulders, randomly divided into 3 groups, were constructed with a TOE configuration using the same medial suture anchor and placing a Tekscan sensing pad between the repaired rotator cuff tendon and footprint. Nine of the 18 shoulders were used to measure footprint contact characteristics. With use of the Tekscan measurement system, the contact pressure and area between the rotator cuff tendon and greater tuberosity were quantified for bridging suture tensions of 60, 90, and 120 N with glenohumeral abduction angles of 0° and 30° and humeral rotation angles of 30° (internal), 0°, and 30° (external). TOE constructs of all 18 shoulders then underwent construct failure testing (cyclic loading and load to failure) to determine the yield load, ultimate load, stiffness, hysteresis, strain, and failure mode at 60 and 120 N of tension. As bridging suture tension increased, contact force, contact pressure, and peak pressure increased significantly at all positions (P < .05 for all). Regarding contact area, no significant differences were found between 90 and 120 N at all positions, although there were significant differences between 60 and 90 N. The construct failure test demonstrated no significant differences in any parameters according to various tensions (P > .05 for all). Increasing bridging suture tension to over 90 N did not improve contact area but did increase contact force and pressure. Bridging suture tension did not significantly affect ultimate failure loads. Considering the risks of overtensioning bridging sutures, it may be clinically more beneficial to keep bridging suture tension below 90 N. © 2015 The Author(s).

  20. Seismic Performance of Columns with Grouted Couplers in Idaho Accelerated Bridge Construction Applications

    DOT National Transportation Integrated Search

    2016-10-16

    n Accelerated Bridge Construction (ABC) methods, one way to connect prefabricated columns is by using grouted steel bar couplers. As of October 2016, in the U.S., only Utah DOT allows the use of grouted couplers in plastic hinge locations in seismic ...

  1. 37. Photographic copy of the original construction drawing, 1934, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photographic copy of the original construction drawing, 1934, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department. Stress sheet, continuous span - Mark Twain Memorial Bridge, Spanning Mississippi River at US Route 36, Hannibal, Marion County, MO

  2. Stay-in-place bridge deck forms, a state of the art review. Prestressed panel subdecks.

    DOT National Transportation Integrated Search

    1973-01-01

    The results of prior research conducted on precast prestressed panel subdecks for use in the construction of bridge decks are reviewed and summarized. This construction technique utilizes the precast panel subdecks as the forming for the cast-in-plac...

  3. Two-course bonded concrete bridge deck construction : condition and performance after six years.

    DOT National Transportation Integrated Search

    1981-01-01

    This report presents the findings from a six-year study of two-course bonded concrete bridge decks constructed in Virginia. Each of three special portland cement concretes was applied as an overlay, or wearing course, on two experimental spans. The o...

  4. Feasibility evaluation of utilizing high strength concrete in design and construction of highway bridge structures : interim report.

    DOT National Transportation Integrated Search

    1992-12-01

    The objective of this investigation was to evaluate the feasibility of using high-strength concrete in the design and construction of highway bridge structures. A literature search was conducted; a survey of five regional fabrication plants was perfo...

  5. 75 FR 27428 - Safety Standards for Steel Erection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-17

    ... in National Highway System construction projects to comply with a number of standards, policies, and...://www.fhwa.dot.gov/bridge/lrfd/index.htm .) For projects involving bridge construction (e.g., temporary... of these requirements will enhance the safety of employees operating on or near structural steel...

  6. 77 FR 74784 - Safety Zone for Recovery Operations for East Jefferson Street Train Derailment, Mantua Creek...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-18

    ... 1625-AA00 Safety Zone for Recovery Operations for East Jefferson Street Train Derailment, Mantua Creek... establishing a safety zone one mile north and one mile south of the East Jefferson Street Railroad Bridge... materials into Mantua Creek and the surrounding air. This regulation is necessary to provide for the safety...

  7. 76 FR 34869 - Safety Zone; Truman-Hobbs Alteration of the Elgin Joliet & Eastern Railroad Drawbridge; Illinois...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ... raise any novel legal or policy issues. The safety zone around the bridge project will be relatively... through the safety zone when permitted by the Captain of the Port. Small Entities Under the Regulatory... impact on a substantial number of small entities. The term ``small entities'' comprises small businesses...

  8. Field performance of timber bridges. 9, Big Erick`s stress-laminated deck bridge

    Treesearch

    J. A. Kainz; J. P. Wacker; M. Nelson

    The Big Erickas bridge was constructed during September 1992 in Baraga County, Michigan. The bridge is 72 ft long, 16 ft wide, and consists of three simple spans: two stress-laminated deck approach spans and a stress-laminated box center span. The bridge is unique in that it is one of the first known stress-laminated timber bridge applications to use Eastern Hemlock...

  9. NPSNET: Dynamic Terrain and Cultured Feature Depiction

    DTIC Science & Technology

    1992-09-01

    defaults. bridge(terrain *ptr, vertex pos, bridge mattype bmat ); This constructor takes only the pointer to the underlying terrain, a placement, and a...material to use for construction. bridge(terrain *ptr, vertex pos, bridge-mattype bmat , float dir); This constructor takes a terrain pointer, a...placement position, a material to use, and a direction to run. bridge(terrain *ptr, vertex pos, bridge-mattype bmat , float dir, float width, float height

  10. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... bridge permits. 1.01-60 Section 1.01-60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... bridge permits. (a) The Commandant delegates to the Deputy Commandant for Operations (CG-DCO), the authority to issue the following permits for the construction, reconstruction, or alteration of bridges...

  11. Recommendations for the connection between full-depth precast bridge deck panel systems and precast I-beams.

    DOT National Transportation Integrated Search

    2007-01-01

    Precast bridge deck panels can be used in place of a cast-in-place concrete deck to reduce bridge closure times for deck replacements or new bridge construction. The panels are prefabricated at a precasting plant providing optimal casting and curing ...

  12. Effect of voids in grouted, post-tensioned concrete bridge construction : volume 1--electrochemical testing and reliability assessment.

    DOT National Transportation Integrated Search

    2009-09-01

    Post-tensioned (PT) bridges are major structures that carry significant traffic. PT bridges are economical for spanning long distances. : In Texas, there are several signature PT bridges. In the late 1990s and early 2000s, several state highway agenc...

  13. Long term monitoring of carbon composite strands in the Penobscot-Narrows bridge.

    DOT National Transportation Integrated Search

    2015-06-01

    The Penobscot-Narrows Bridge was constructed between May 2003 and December 2006. The bridge is a cable-stayed design with twin pylons and a 2,120-foot span. This cable-stayed bridge features a cradle stay system that : allows for each cable strand in...

  14. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... bridge permits. 1.01-60 Section 1.01-60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... bridge permits. (a) The Commandant delegates to the Deputy Commandant for Operations (CG-DCO), the authority to issue the following permits for the construction, reconstruction, or alteration of bridges...

  15. Return to Beringia: parasites reveal cryptic biogeographic history of North American pikas

    USDA-ARS?s Scientific Manuscript database

    As a dispersal corridor between the northern continents, the Bering Land Bridge played a key role in shaping Holarctic biotas. The Beringian paradigm identifies the land bridge as a zone of predominantly eastward expansion from Eurasia and a staging area for subsequent colonization of lower latitude...

  16. Preliminary seismic evaluation and ranking of bridges on and over the parkways in Western Kentucky.

    DOT National Transportation Integrated Search

    2008-06-01

    Five parkways in Western Kentucky are located in the region that is greatly influenced by the New Madrid and Wabash Valley Seismic Zones. This report executes a preliminary screening process, known also as the Seismic Rating System, for bridges on an...

  17. 49 CFR Appendix A to Part 237 - Supplemental Statement of Agency Policy on the Safety of Railroad Bridges

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... for the design of a bridge can generally be used to determine and rate the load capacity of a bridge... from the service loads can be correlated to the stresses for which the bridge was designed or rated. 3... bridge should keep design, construction, maintenance and repair records readily accessible to permit the...

  18. 49 CFR Appendix A to Part 237 - Supplemental Statement of Agency Policy on the Safety of Railroad Bridges

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... for the design of a bridge can generally be used to determine and rate the load capacity of a bridge... from the service loads can be correlated to the stresses for which the bridge was designed or rated. 3... bridge should keep design, construction, maintenance and repair records readily accessible to permit the...

  19. 49 CFR Appendix A to Part 237 - Supplemental Statement of Agency Policy on the Safety of Railroad Bridges

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for the design of a bridge can generally be used to determine and rate the load capacity of a bridge... from the service loads can be correlated to the stresses for which the bridge was designed or rated. 3... bridge should keep design, construction, maintenance and repair records readily accessible to permit the...

  20. Field performance of timber bridges. 15, Pueblo County, Colorado, stress-laminated deck bridge

    Treesearch

    L. E. Hislop

    The Pueblo County 204B bridge was constructed in March 1990 in Pueblo, Colorado, as a demonstration bridge under the USDA Forest Service Timber Bridge Initiative. The stress-laminated deck superstructure is approximately 10 m long, 9 m wide, and 406 mm deep, with a skew of 10 degrees. Performance monitoring was conducted for 3 years, beginning at...

  1. Three-unit bridge construction in anterior single-pontic areas using a metal-free restorative.

    PubMed

    Narcisi, E M

    1999-02-01

    A new glass-ceramic material, IPS Empress 2, is revolutionizing esthetic restorative dentistry by allowing metal-free, three-unit bridge construction in anterior and premolar single-pontic areas. The case discussed in this article illustrates the material's application in the dual-arch restoration of a young woman with congenitally missing teeth. The material was used as an alternative to single-tooth implant restorations to place two maxillary three-unit bridges, one mandibular three-unit bridge, and two mandibular porcelain veneers. IPS Empress 2 provides an esthetic alternative to porcelain-fused-to-metal restorations by facilitating attractive, functional tooth restoration.

  2. CF60 Concrete Composition Design and Application on Fudiankou Xijiang Super Large Bridge

    NASA Astrophysics Data System (ADS)

    Qiu, Yi Mei; Wen, Sen Yuan; Chen, Jun Xiang

    2018-06-01

    Guangxi Wuzhou City Ring Road Fudiankou Xijiang super large bridge CF60 concrete is a new multi-phase composite high-performance concrete, this paper for the Fudiankou Xijiang bridge structure and characteristics of the project, in accordance with the principle of local materials and technical specification requirements, combined with the site conditions of CF60 engineering high performance concrete component materials, proportion and the technical performance, quantify the main physical and mechanical performance index. Analysis main influencing factors of the technical indicators, reasonable adjustment of concrete mix design parameters, and the use of technical means of admixture and multi-function composite admixture of concrete, obtain the optimal proportion of good work, process, mechanical properties stability and durability of engineering properties, recommend and verification of concrete mix; to explore the CF60 high performance concrete Soil in the Fudiankou Xijiang bridge application technology, detection and tracking the quality of concrete construction, concrete structure during the construction of the key technology and control points is proposed, evaluation of CF60 high performance concrete in the actual engineering application effect and benefit to ensure engineering quality of bridge structure and service life, and super long span bridge engineering construction to provide basis and reference.

  3. 41. Photographic copy of the original construction drawing, 192627, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. Photographic copy of the original construction drawing, 1926-27, by Harrington, Howard, and Ash, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department, Jefferson City, Missouri. STRESS SHEET - Cape Girardeau Bridge, Spanning Mississippi River at State Highway 146, Cape Girardeau, Cape Girardeau County, MO

  4. 45. Photographic copy of the original construction drawing, 1934, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. Photographic copy of the original construction drawing, 1934, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department. Cross section--300-ft. span - Mark Twain Memorial Bridge, Spanning Mississippi River at US Route 36, Hannibal, Marion County, MO

  5. 44. Photographic copy of the original construction drawing, 1934, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photographic copy of the original construction drawing, 1934, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department. Details of 300-ft. span - Mark Twain Memorial Bridge, Spanning Mississippi River at US Route 36, Hannibal, Marion County, MO

  6. Two-course bonded concrete bridge deck construction : interim report no. 2, concrete properties and deck condition prior to opening to traffic.

    DOT National Transportation Integrated Search

    1976-01-01

    Presented in this report is information concerning the characteristics of the concretes used to construct six experimental two-course bonded bridge decks in Virginia. The quality of the overlay concretes produced under standard specifications supplem...

  7. Use of high performance, high strength concrete (HPC) bulb-tee girders saves millions on I-10 twin span bridge in New Orleans district.

    DOT National Transportation Integrated Search

    2005-01-01

    History: LADOTD has been gradually introducing high performance, high strength concrete into its bridge construction program. At the same time, LTRC has been sponsoring research work to address design and construction issues related to the utilizatio...

  8. 10. Photocopy of photograph original print located in collection of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photocopy of photograph original print located in collection of William H. Caruthers, Jr., Richmond, Virginia, and loaned by Susan A. Hatter, Tempe, Arizona. Photographer assumed to be William H. Caruthers, Sr., assistant (construction) engineer for the Ash Avenue Bridge, 1912 VIEW, LOOKING NORTH, SHOWING ASH AVENUE BRIDGE UNDER CONSTRUCTION. WORK IS PROGRESSING FROM THE SOUTH BANK TO THE NORTH BANK OF THE SALT RIVER - Ash Avenue Bridge, Spanning Salt River at Foot of Ash Avenue, Tempe, Maricopa County, AZ

  9. Graph theory data for topological quantum chemistry.

    PubMed

    Vergniory, M G; Elcoro, L; Wang, Zhijun; Cano, Jennifer; Felser, C; Aroyo, M I; Bernevig, B Andrei; Bradlyn, Barry

    2017-08-01

    Topological phases of noninteracting particles are distinguished by the global properties of their band structure and eigenfunctions in momentum space. On the other hand, group theory as conventionally applied to solid-state physics focuses only on properties that are local (at high-symmetry points, lines, and planes) in the Brillouin zone. To bridge this gap, we have previously [Bradlyn et al., Nature (London) 547, 298 (2017)NATUAS0028-083610.1038/nature23268] mapped the problem of constructing global band structures out of local data to a graph construction problem. In this paper, we provide the explicit data and formulate the necessary algorithms to produce all topologically distinct graphs. Furthermore, we show how to apply these algorithms to certain "elementary" band structures highlighted in the aforementioned reference, and thus we identified and tabulated all orbital types and lattices that can give rise to topologically disconnected band structures. Finally, we show how to use the newly developed bandrep program on the Bilbao Crystallographic Server to access the results of our computation.

  10. Cost and Ecological Feasibility of using UHPC in Highway Bridges

    DOT National Transportation Integrated Search

    2017-11-15

    There is a growing interest in expanding the use of Ultra-high performance concrete (UHPC) from bridge deck joints for accelerated bridge construction to complex architectural and advanced structural applications. The high costs currently associated ...

  11. Bridge inspection / washing program : bridge drainage program

    DOT National Transportation Integrated Search

    2002-02-01

    The Rhode Island Department of Transportation, Operations Division is responsible for operation and maintenance of roads and bridges, and construction of highway and multi-modal projects to improve the transportation system of our state. One of the m...

  12. Durability assessment of prefabricated bridge elements and systems.

    DOT National Transportation Integrated Search

    2015-02-01

    This study aims to address some of the concerns related to implementation of prefabricated bridge elements and systems (PBES) : and accelerated bridge construction (ABC) in Maryland, where some barriers included assessment of the quality and durabili...

  13. 6. BRIDGE LOOKING SOUTH FROM CROWN POINT STATE PARK SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. BRIDGE LOOKING SOUTH FROM CROWN POINT STATE PARK SHOWING SURROUNDING DEVELOPMENT FROM CONSTRUCTION OF DAM - Columbia River Bridge at Grand Coulee Dam, Spanning Columbia River at State Route 155, Coulee Dam, Okanogan County, WA

  14. A forecast of bridge engineering, 1980-2000.

    DOT National Transportation Integrated Search

    1979-01-01

    A three-pronged study was undertaken to forecast the nature of bridge engineering and construction for the years 1980 to 2000. First, the history of bridge engineering was explored to extrapolate likely future developments. Second, a detailed questio...

  15. Guidelines For The Use, Design, And Construction Of Bridge Approach Slabs

    DOT National Transportation Integrated Search

    1999-11-01

    Differential settlement at the roadway/bridge interface typically results in an abrupt grade change, causing driver discomfort impairing driver safety, and exerting potentially excessive impact traffic loading on the abutment. Bridge approach slabs a...

  16. 6. VIEW FACING EAST ALONG NORTH FACE OF BRIDGE AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW FACING EAST ALONG NORTH FACE OF BRIDGE AT CONSTRUCTION DETAILS OF WOOD RAILINGS AND STONE ABUTMENTS. - South Fork Tuolumne River Bridge, Spanning South Fork Tuolumne River on Tioga Road, Mather, Tuolumne County, CA

  17. Cut-and-connect of two antiparallel vortex tubes

    NASA Technical Reports Server (NTRS)

    Melander, Mogens V.; Hussain, Fazle

    1988-01-01

    Motivated by an early conjecture that vortex cut-and-connect plays a key role in mixing and production of turbulence, helicity and aerodynamic noise, the cross-linking of two antiparallel viscous vortex tubes via direct numerical simulation is studied. The Navier-Stokes equations are solved by a dealiased pseudo-spectral method with 64 cubed grid points in a periodic domain for initial Reynolds numbers Re up to 1000. The vortex tubes are given an initial sinusoidal perturbation to induce a collision and keep the two tubes pressed against each other as annihilation continues. Cross-sectional and wire plots of various properties depict three stages of evolution: (1) Inviscid induction causing vortex cores to first approach and form a contact zone with a dipole cross-section, and then to flatten and stretch; (2) Vorticity annihilation in the contact zone accompanied by bridging between the two vortices at both ends of the contact zone due to a collection of cross-linked vortex lines, now orthogonal to the initial vortex tubes. The direction of dipole advection in the contact zone reverses; and (3) Threading of the remnants of the original vortices in between the bridges as they pull apart. The crucial stage 2 is shown to be a simple consequence of vorticity annihilation in the contact zone, link-up of the un-annihilated parts of vortex lines, and stretching and advection by the vortex tube swirl of the cross-linked lines, which accumulate at stagnation points in front of the annihilating vortex dipole. It is claimed that bridging is the essence of any vorticity cross-linking and that annihilation is sustained by stretching of the dipole by the bridges. Vortex reconnection details are found to be insensitive to asymmetry. Modeling of the reconnection process is briefly examined. The 3D spatial details of scalar transport (at unity Schmidt number), enstrophy production, dissipation and helicity are also examined.

  18. Acoustic energy propagation around railways

    NASA Astrophysics Data System (ADS)

    Cizkova, Petra

    2017-09-01

    The article deals with the issues of acoustic energy propagation around railways. The research subject was noise emission spreading into the surroundings during the passage of trains over a directly travelled steel bridge construction. Noise emissions were measured using direct measurements in the field. The measurements were performed in two measurement profiles. The noise exposures A LAE measured near the steel bridge construction were compared against the noise exposures A LAE captured on an open track. From the difference of these data, the noise level of the steel bridge structure was determined. Part of the research was to evaluate the effect of the reconstruction of the railway track superstructure on the acoustic situation in the given section of the railway track. The article describes the methodology of measurements, including the processing and evaluation of measured data. The article points out the noise levels of the steel bridge construction and assesses changes in the acoustic situation after the reconstruction.

  19. 23 CFR 661.53 - What standards should be used for bridge design?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false What standards should be used for bridge design? 661.53... TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.53 What standards should be used for bridge design? (a) Replacement—A replacement structure must meet the current geometric, construction and...

  20. Laboratory and field testing of an accelerated bridge construction demonstration bridge : US Highway 6 bridge over Keg Creek : tech transfer summary.

    DOT National Transportation Integrated Search

    2013-04-01

    To address the need for the development of a fast, repeatable, and dependable way to replace typical bridges across the country, the Transportation Research Board (TRB) developed project R04, Innovative Designs for Rapid Renewal, as part of the...

  1. 23 CFR 661.53 - What standards should be used for bridge design?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false What standards should be used for bridge design? 661.53... TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.53 What standards should be used for bridge design? (a) Replacement—A replacement structure must meet the current geometric, construction and...

  2. 77 FR 1020 - Regulated Navigation Area; S99 Alford Street Bridge Rehabilitation Project, Mystic River, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-09

    ...-AA11 Regulated Navigation Area; S99 Alford Street Bridge Rehabilitation Project, Mystic River, MA... Mystic River under and surrounding the S99 Alford Street Bridge which crosses the Mystic River between... construction workers by restricting vessel traffic during periods where the bridge is being repaired. DATES...

  3. Contact area and pressure in suture bridge rotator cuff repair using knotless lateral anchors.

    PubMed

    Tompkins, Marc; Monchik, Keith O; Plante, Matthew J; Fleming, Braden C; Fadale, Paul D

    2011-10-01

    To evaluate whether the use of knotless lateral anchors in a suture bridge construct produces better contact area and pressure parameters than a suture bridge construct with standard lateral anchors that require knots or a double-row repair. The hypothesis was that knotless lateral anchors would produce better contact area and pressure parameters than the other two constructs. A total of fifteen matched pairs of cadaveric shoulders were divided into three groups. In Group 1, a suture bridge using knotless anchors for the lateral row was performed on five shoulders. A suture bridge using standard lateral row anchors that require knots was performed on the contralateral shoulders. In Group 2, suture bridge with knotless lateral row anchors was compared with double-row repair. In Group 3, suture bridge using standard lateral row anchors was compared with double-row repair. The contact conditions of the rotator cuff footprint were measured using pressure-sensitive film. There were no statistically significant differences between any of the techniques regarding contact area F(2, 15.7) = 3.09, P = 0.07 or mean contact pressure F(2, 15.1) = 2.35, P = 0.12. A post hoc power analysis suggests differences between techniques are likely less than 91-113 mm(2) for area and 0.071-0.089 N for pressure. The use of knotless anchors in the lateral row of a suture bridge repair did not increase the footprint contact area or contact pressure when compared to a suture bridge repair requiring knots laterally or to a double-row repair.

  4. Assessment and maintenance of a 15 year old stress-laminated timber bridge

    Treesearch

    T. Russell Gentry; Karl N. Brohammer; John Wells; James P. Wacker

    2006-01-01

    A timber bridge consisting of three 6.7 meter spans with a stress laminated deck was constructed in 1991 in the Spirit Creek State Forest near August, Georgia, USA. The stress laminated bridge uses a series of post-tensioning bars to hold the laminations together. The bridge remained in service until 2001 with no maintenance, at which time the bridge was inspected,...

  5. Field performance of timber bridges. 16, North Siwell Road stress-laminated bridge

    Treesearch

    J. A. Kainz

    The North Siwell Road bridge was constructed during December 1994 in Hinds County, Mississippi. The bridge is a single-span, stress-laminated T-beam structure that measures 9.1 m (30 ft) long and 8.7 m (28.5 ft) wide. Performance of the bridge was monitored for 24 months, beginning at the time of installation. Monitoring involved gathering and evaluating data relative...

  6. 33 CFR 165.163 - Safety Zones; Port of New York/New Jersey Fleet Week.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Safety Zones; Port of New York... § 165.163 Safety Zones; Port of New York/New Jersey Fleet Week. (a) The following areas are established... parade vessels as it transits the Port of New York and New Jersey from the Verrazano Narrows Bridge to...

  7. Backwater effects of Piers in Subcritical Flow

    DOT National Transportation Integrated Search

    2001-10-01

    Construction or renovation of bridge structures may require placement of bridge piers within the channel or floodplain of natural waterways. These piers will obstruct the flow and may cause an increase in water levels upstream of the bridge structure...

  8. Investigation of cause of cracked stringer on the Blanchette Bridge.

    DOT National Transportation Integrated Search

    2006-10-05

    The Blanchette Bridge carries Interstate 70 across the Missouri River, connecting St. Louis and St. Charles : counties in eastern Missouri. The westbound bridge was constructed in 1958. In 1979, the original : reinforced concrete roadway deck on the ...

  9. Investigations of a precast bridge deck system.

    DOT National Transportation Integrated Search

    2010-07-01

    Improved methods of bridge deck construction are greatly needed. Bridge decks are often the first element to require repair or replacement because of its direct exposure to the elements and tire wear. This report presents a new precast overhang syste...

  10. Elevated temperature properties of weathering steel.

    DOT National Transportation Integrated Search

    2014-01-01

    In recent decades, bridge fires have become a major concern in the U.S. Fire hazard in bridges can result in significant economic and public losses. New construction of bridges often use Weathering Steel (also known as Corten Steel), whic...

  11. Rapid replacement/construction of bridges.

    DOT National Transportation Integrated Search

    2012-11-01

    Bridges are a key element of the transportation system because they control system capacity and are normally built at : the highest cost to the system. Once a bridge reaches its useful design service life, it needs to be replaced or : reconstructed i...

  12. Integral abutment bridges under thermal loading : numerical simulations and parametric study.

    DOT National Transportation Integrated Search

    2016-06-01

    Integral abutment bridges (IABs) have become of interest due to their decreased construction and maintenance costs in : comparison to conventional jointed bridges. Most prior IAB research was related to substructure behavior, and, as a result, most :...

  13. Recommendations for design, construction, and maintenance of bridge approach slabs.

    DOT National Transportation Integrated Search

    2012-09-01

    Settlement and heave related movements of bridge approach slabs relative to bridge decks create a bump in : the roadway. Several problems arise from these bumps, which include poor riding conditions, potential : vehicle damage, loss of vehicle contro...

  14. Knotless double-row SutureBridge rotator cuff repairs have improved self-reinforcement compared with double-row SutureBridge repairs with tied medial knots: a biomechanical study using an ovine model.

    PubMed

    Smith, Geoffrey C S; Bouwmeester, Theresia M; Lam, Patrick H

    2017-12-01

    In double-row SutureBridge (Arthrex, Naples, FL, USA) rotator cuff repairs, increasing tendon load may generate progressively greater compression forces at the repair footprint (self-reinforcement). SutureBridge rotator cuff repairs using tied horizontal mattress sutures medially may limit this effect compared with a knotless construct. Rotator cuff repairs were performed in 9 pairs of ovine shoulders. One group underwent repair with a double-row SutureBridge construct with tied horizontal medial-row mattress sutures. The other group underwent repair in an identical fashion except that medial-row knots were not tied. Footprint contact pressure was measured at 0° and 20° of abduction under loads of 0 to 60 N. Pull-to-failure tests were then performed. In both repair constructs, each 10-N increase in rotator cuff tensile load led to a significant increase in footprint contact pressure (P < .0001). The rate of increase in footprint contact pressure was greater in the knotless construct (P < .00022; ratio, 1.69). The yield point approached the ultimate load to failure more closely in the knotless model than in the knotted construct (P = .00094). There was no difference in stiffness, ultimate failure load, or total energy to failure between the knotless and knotted techniques. In rotator cuff repair with a double-row SutureBridge configuration, self-reinforcement is seen in repairs with and without medial-row knots. Self-reinforcement is greater with the knotless technique. Copyright © 2017 Journal of Shoulder and Elbow Surgery Board of Trustees. Published by Elsevier Inc. All rights reserved.

  15. 20. Photographic copy of the original construction drawing, 193031, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photographic copy of the original construction drawing, 1930-31, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department, Jefferson City, Missouri. Truss stress diagram, and plans of laterals and sway braces - Gasconade Bridge, Spanning Gasconade River at State Route 100, Gasconade, Gasconade County, MO

  16. 11. Photographic copy of lines drawing of original construction (24 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photographic copy of lines drawing of original construction (24 January 1911, in possession of St. Louis County Bridge Engineer, Virginia, Minnesota). Profile of main and approach spans; plan and sectional view of concrete river pier - Brosseau Road Bridge, County Road 694 spanning Cloquet at River, Burnett, St. Louis County, MN

  17. 75 FR 4612 - Agency Information Collection Activities: Notice of Request for Extension of Currently Approved...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... construction time and traffic congestion; C. The development of engineering design criteria for innovative products, materials, and structural systems for use in highway bridges and structures; D. The reduction of... construction, repair, and rehabilitation of bridges and other highway structures. This program was funded by...

  18. Field instrumentation and measured response of the I-295 cable-stayed bridge : interim report on construction measurements in deck segments.

    DOT National Transportation Integrated Search

    1991-01-01

    During the construction of the I-295 cable-stayed bridge, an extensive array of mechanical strain gage points were installed in sections of the box girders, pylons, and piers. At each instrumented box girder section, five longitudinal gages were plac...

  19. Influence of Thermocapillary Flow on Capillary Stability: Long Float-Zones in Low Gravity

    NASA Technical Reports Server (NTRS)

    Chen, Yi-Ju; Steen, Paul H.

    1996-01-01

    A model problem is posed to study the influence of flow on the interfacial stability of a nearly cylindrical liquid bridge for lengths near its circumference (the Plateau-Rayleigh limit). The flow is generated by a shear stress imposed on the deformable interface. The symmetry of the imposed shear stress mimics the thermocapillary stress induced on a float-zone by a ring heater (i.e. a full zone). Principal assumptions are (1) zero gravity, (2) creeping flow, and (3) that the imposed coupling at the free surface between flow and temperature fields is the only such coupling. A numerical solution, complemented by a bifurcation analysis, shows that bridges substantially longer than the Plateau-Rayleigh limit are possible. An interaction of the first two capillary instabilities through the stress-induced flow is responsible. Time-periodic standing waves are also predicted in certain parameter ranges. Motivation comes from extra-long float-zones observed in MEPHISTO space lab experiments (June 1994).

  20. Thermal activation energy for bidirectional movement of actin along bipolar tracks of myosin filaments.

    PubMed

    Okubo, Hiroyuki; Iwai, Masanori; Iwai, Sosuke; Chaen, Shigeru

    2010-05-28

    Previous in vitro motility assays using bipolar myosin thick filaments demonstrated that actin filaments were capable of moving in both directions along the myosin filament tracks. The movements; however, were slower in the direction leading away from the central bare zone than towards it. To understand the mechanism underlying these different direction-dependent motilities, we have examined the effects of temperature on the velocities of the bidirectional movements along reconstituted myosin filaments. Activation energies of the movements were determined by Arrhenius plots at high and low concentrations of ATP. As a result, the thermal activation energy of the movement away from the central bare zone was significantly higher than that of the movement toward the zone. Given that the backward movement away from the central bare zone would cause the myosin heads to be constrained and the stiffness of the cross-bridges to increase, these results suggest that elastic energy required for the cross-bridge transition is supplied by thermal fluctuations. Copyright (c) 2010 Elsevier Inc. All rights reserved.

  1. Latex and microsilica modified concrete bridge deck overlays in Oregon : final report.

    DOT National Transportation Integrated Search

    1997-05-01

    The final report presents information collected by ODOT personnel from bridge deck overlays constructed in Oregon between 1989 and 1995. Decks were placed on a variety of existing bridge types prepared using hydrodemolition, milling, and diamond grin...

  2. Corrosion resistance of grouted post-tensioning systems : [summary].

    DOT National Transportation Integrated Search

    2013-08-01

    The increased popularity of post-tensioned bridge construction in the United States has led to concerns about corrosion and its impact on the life cycle of these bridges. Although the vast majority of post-tensioned bridges in the United States have ...

  3. Fiberglass reinforced polymer composite bridge deck construction in Illinois

    DOT National Transportation Integrated Search

    2002-09-01

    An experiment was conducted using a fiber reinforced polymer composite material for the bridge deck of a low volume bridge. The test location was on South Fayette Street over the Town Brook in Jacksonville, Illinois. This project included removal of ...

  4. Integral abutment bridge for Louisiana's soft and stiff soils.

    DOT National Transportation Integrated Search

    2016-03-01

    Integral abutment bridges (IABs) have been designed and constructed in a few US states in the past few : decades. The initial purpose of building such bridges was to eliminate the expansion joints and resolve the : joint-induced problems. Although IA...

  5. Theoretical and field experimental evaluation of skewed modular slab bridges : [research summary].

    DOT National Transportation Integrated Search

    2012-12-01

    Adjacent precast, prestressed concrete multi-beam bridges have become more : prevalent due to their rapid construction time and cost effectiveness. Over the : years, various adjustments and refinements have been made to the design of : these bridges ...

  6. Effect of implementing lean-on bracing in skewed steel I-girder bridges.

    DOT National Transportation Integrated Search

    2016-09-01

    Skew of the supports in steel I-girder bridges cause undesirable torsional effects, increase cross-frame forces, and generally increase the difficulty of designing and : constructing a bridge. The girders experience differential deflections due to th...

  7. Concrete box-beam deterioration, phase II : appendices.

    DOT National Transportation Integrated Search

    2009-04-13

    Side-by-side box-beam bridge constitutes approximately 17 percent of bridges built or replaced annually on public roads and there is a renewed thrust to use this bridge type for rapid construction under the Highway for LIFE program. Further, failure ...

  8. Continuity diaphragm for skewed continuous span precast prestressed concrete girder bridges.

    DOT National Transportation Integrated Search

    2004-10-01

    Continuity diaphragms used on skewed bents in prestressed girder bridges cause difficulties in detailing and : construction. Details for bridges with large diaphragm skew angles (>30) have not been a problem for LA DOTD. : However, as the skew angl...

  9. Innovative concrete bridging systems for pedestrian bridges : implementation and monitoring.

    DOT National Transportation Integrated Search

    2013-08-01

    Two precast, prestressed pedestrian bridges were designed for rapid construction in Rolla, MO, utilizing high-strength concrete (HSC) : and high-strength self-consolidating concrete (HS-SCC) with a target 28 day compressive strength of 68.9 MPa (10,0...

  10. Reflective Cracking between Precast Prestressed Box Girders

    DOT National Transportation Integrated Search

    2017-06-30

    The adjacent precast prestressed concrete box-beam bridge is the bridge of choice for short and short-to-medium span bridges. This choice is because of the ease of construction, favorable span-to-depth ratios, aesthetic appeal, and high torsional sti...

  11. Chapter 10:Hardwoods for timber bridges

    Treesearch

    James P. Wacker; Ed T. Cesa

    2005-01-01

    This chapter describes the joint efforts of the Forest Service and the FHWA to administer national programs including research, demonstration bridges, and technology transfer components. Summary information on a number of Forest Service-WIT demonstration bridges constructed with hardwoods is also provided.

  12. Field performance of timber bridges. 17, Ciphers stress-laminated deck bridge

    Treesearch

    James P. Wacker; James A. Kainz; Michael A. Ritter

    In September 1989, the Ciphers bridge was constructed within the Beltrami Island State Forest in Roseau County, Minnesota. The bridge superstructure is a two-span continuous stress-laminated deck that is approximately 12.19 m long, 5.49 m wide, and 305 mm deep (40 ft long, 18 ft wide, and 12 in. deep). The bridge is one of the first to utilize red pine sawn lumber for...

  13. Field performance of timber bridges. 12, Christian Hollow stress-laminated box-beam bridge

    Treesearch

    J. P. Wacker; S. C. Catherman; R. G. Winnett

    In January 1992, the Christian Hollow bridge was constructed in Steuben County, New York. The bridge is a single-span, stress-laminated box-beam superstructure that is 9.1 m long, 9.8 m wide, and 502 mm deep (30 ft long, 32 ft wide, and 19-3/4 in. deep). The performance of the bridge was continuously monitored for 28 months, beginning shortly after installation....

  14. Live-load performance evaluation of historic covered timber bridges in the United States

    Treesearch

    Junwon Seo; Travis K. Hosteng; Brent M. Phares; James P. Wacker

    2015-01-01

    The National Historic Covered Bridge Preservation Program (NHCBP), sponsored by the Federal Highway Administration (FHWA), was established to preserve the covered timber bridge structures that were constructed in the early 1800s. Today, many of the approximately 880 covered timber bridges still in existence in the United States are closed to vehicular traffic;...

  15. Long-term performance monitoring of hardwood timber bridges in Pennsylvania

    Treesearch

    James P. Wacker; Carlito Calil; Lola E. Hislop; Paula D. Hilbrich Lee; James A. Kainz

    2004-01-01

    Several hardwood timber bridges were constructed in Pennsylvania during the early 1990s. This report summarizes the long-term field performance of seven stress-laminated deck bridges over a 4-year period beginning August 1997 and ending July 2001. Data collected include lumber moisture content, static load test deflection measurements, and bridge condition assessments...

  16. Building Bridges One Line at a Time

    ERIC Educational Resources Information Center

    Grigsby, Cathy Murray

    2012-01-01

    In this article, first-grade students were taught the different kinds of lines that were part of the construction of various bridges--the curved lines of the arches of stone bridges, straight lines connecting the cables of a suspension bridge, vertical lines, horizontal lines, and so on. They gained practice in drawing structures and in fine brush…

  17. Photographic copy of circa 1934, 10” x 15”, black and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of circa 1934, 10” x 15”, black and white aerial photograph. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. AERIAL PHOTOGRAPH OF BRIDGE UNDER CONSTRUCTION FROM WEST BANK LOOKING NORTH TOWARD EAST BANK DOWN RIVER SHOWING OVERALL VIEW OF BRIDGE PIER CONSTRUCTION. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  18. Hydraulic analysis, Paint Creek at State Route 772, Chillicothe, Ohio

    USGS Publications Warehouse

    Mayo, R.I.; Bartlett, W.P.

    1981-01-01

    The Ohio Department of Transportation, Division of Highways, proposes to replace a three-span arch, bridge across Paint Creek on South Paint Street in Chillicothe, Ohio with a new deck-type structure resting on four sets of piles and four piers. Profiles of the 10-, 25-, 50- and 100-year floods under present conditions and under conditions modified by constructions of the new bridge are presented in this report. The results indicate that the construction of the new bridge will not cause significant changes in the flood profiles or the areas inundated.

  19. Investigation of techniques for accelerating the construction of bridge deck overlays : tech transfer summary.

    DOT National Transportation Integrated Search

    2016-04-01

    Todays environment is increasingly hostile to bridge decks with exposure : to deicing salts and environmental factors such as large temperature swings : and polluting chemicals. Being subjected to the most severe loading of all the : bridge compon...

  20. Feasibility of using shape memory alloys to develop self post-tensioned concrete bridge girders.

    DOT National Transportation Integrated Search

    2013-08-01

    Post-tensioned (PT) structural elements are used quite often in bridges due to their ability to span long widths : economically while providing an aesthetically pleasing structure. PT systems are also preferred in bridge construction : because they g...

  1. Evaluation of continuity detail for precast prestressed girders : research project capsule.

    DOT National Transportation Integrated Search

    2008-03-01

    The construction of a new bridge : crossing the Mississippi River north of : Baton Rouge is currently underway. The : project, named the John James : Audubon Bridge, is a true landmark. Its : main span will be the longest cablestayed : bridge in Nort...

  2. Forces in wingwalls from thermal expansion of skewed semi-integral bridges.

    DOT National Transportation Integrated Search

    2010-11-01

    Jointless bridges, such as semi-integral and integral bridges, have become more popular in recent years because of their simplicity in the construction and the elimination of high costs related to joint maintenance. Prior research has shown that skew...

  3. Lateral Bracing of Bridge Girders by Permanent Metal Deck Forms

    DOT National Transportation Integrated Search

    2005-01-10

    Lateral torsional buckling is a failure mode that often controls the design of steel bridge girders during construction. Bracing in the form of cross-frames and diaphragms are often provided at locations along the bridge length to reduce the unbraced...

  4. Pi'ilani Highway side on south side of island, Manawainui Bridge, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Pi'ilani Highway side on south side of island, Manawainui Bridge, constructed in 1993 to modern ASHTO standards; note difference in scale with historic Hana Belt Road bridges - Hana Belt Road, Between Haiku and Kaipahulu, Hana, Maui County, HI

  5. Evaluation of a bridge deck with CFRP prestressed panels under fatigue load cycles

    DOT National Transportation Integrated Search

    2003-09-01

    This report summarizes a study conducted under an IBRC (Innovative Bridge Research and Construction) project sponsored by the FHWA. In this project, a bridge deck with CFRP (carbon fiber reinforced polymeric) prestressed panels and cast-in-place topp...

  6. Fatigue study of a GRP pedestrian bridge : final report.

    DOT National Transportation Integrated Search

    1986-01-01

    Static and cyclic load tests were conducted on a 16-ft long bridge constructed with fiberglass materials. Approximately 1.6 million cycles of loads were applied to the deck to study the fatigue characteristics of the bridge. The location and magnitud...

  7. A survey of non-arched historic concrete bridges in Virginia constructed prior to 1950 : final report.

    DOT National Transportation Integrated Search

    1996-01-01

    Bridges are among the cultural resources that must be considered for historic significance under the Historic Preservation Act of 1966. The Virginia Transportation Research Council conducted pioneering studies of Virginia's early metal truss bridges ...

  8. Post-tensioning technologies.

    DOT National Transportation Integrated Search

    2013-04-01

    Posttensioned bridge construction has become increasingly popular and financially competitive with traditional prestressed concrete : and steel plate girder bridges. Unfortunately, Indiana has experienced several constructionrelated problems in...

  9. 77 FR 67563 - Regulated Navigation Area-New Haven Harbor, Quinnipiac River, Mill River, New Haven, CT; Pearl...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ...; Pearl Harbor Memorial Bridge (Interstate 95) Construction AGENCY: Coast Guard, DHS. ACTION: Final rule... construction of the new Pearl Harbor Memorial Bridge, and which could be needed at other times as well. This..., call or email Petty Officer Joseph Graun, Prevention Department, U.S. Coast Guard Sector Long Island...

  10. 77 FR 47331 - Regulated Navigation Area-New Haven Harbor, Quinnipiac River, Mill River, New Haven, CT; Pearl...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... Harbor Memorial Bridge (Interstate 95) Construction AGENCY: Coast Guard, DHS. ACTION: Notice of proposed... needed during construction of the new Pearl Harbor Memorial Bridge, and which could be needed at other... Department, U. S. Coast Guard Sector Long Island Sound, (203) 468-4544, [email protected] ; or...

  11. Field instrumentation and measured response of the I-295 cable-stayed bridge : interim report on construction period strains in cable stays.

    DOT National Transportation Integrated Search

    1991-01-01

    During the construction of the I-295 cable-stayed bridge, a number of the stays on the main span cantilever were instrumented with electrical resistance strain gages mounted directly on the wires of the seven-wire strands making up the stay cables. M...

  12. Field comparison of the installation and cost of placement of epoxy-coated and MMFX 2 steel deck reinforcement : establishing a baseline for future deck monitoring.

    DOT National Transportation Integrated Search

    2009-01-01

    As part of the Innovative Bridge Research and Construction Program (IBRCP), this study was conducted to use the full-scale construction project of the Route 123 Bridge over the Occoquan River in Northern Virginia to identify and compare any differenc...

  13. Building a Straw Bridge

    ERIC Educational Resources Information Center

    Teaching Science, 2015

    2015-01-01

    This project is for a team of students (groups of two or three are ideal) to design and construct a model of a single-span bridge, using plastic drinking straws as the building material. All steps of the design, construction, testing and critiquing stages should be recorded by students in a journal. Students may like to include labelled diagrams,…

  14. Learning Based on the Project Entitled "Design and Construction of a Wooden Bridge"

    ERIC Educational Resources Information Center

    Barris, Cristina; Torres, Lluís; Simon, Enric

    2016-01-01

    This article presents the results of a case involving the application of project-based learning carried out with students in the Mechanical Engineering degree program at the University of Girona. The project, entitled "Design and construction of a wooden bridge", was conducted at the Polytechnic School in the third-year Structures…

  15. 17. Baltimore through truss steel bridge (1905), built by the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Baltimore through truss steel bridge (1905), built by the American Bridge Company. The bridge is 15 to 20 feet wide, with a wooden deck, and connects the Sullivan Machine Co. with the Foundry. The enclosed bridge in the background was constructed ca. 1920, and connects the Chain Machine Building with its power plant, foundry, and pattern shop. - Sullivan Machinery Company, Main Street between Pearl & Water Streets, Claremont, Sullivan County, NH

  16. Determining the Environmental Benefits of Ultra High Performance Concrete as a Bridge Construction Material

    NASA Astrophysics Data System (ADS)

    Lande Larsen, Ingrid; Granseth Aasbakken, Ida; O'Born, Reyn; Vertes, Katalin; Terje Thorstensen, Rein

    2017-10-01

    Ultra High Performance Concrete (UHPC) is a material that is attracting attention in the construction industry due to the high mechanical strength and durability, leading to structures having low maintenance requirements. The production of UHPC, however, has generally higher environmental impact than normal strength concrete due to the increased demand of cement required in the concrete mix. What is still not sufficiently investigated, is if the longer lifetime, slimmer construction and lower maintenance requirements lead to a net environmental benefit compared to standard concrete bridge design. This study utilizes life cycle assessment (LCA) to determine the lifetime impacts of two comparable highway crossing footbridges spanning 40 meters, designed respectively with UHPC and normal strength concrete. The results of the study show that UHPC is an effective material for reducing lifetime emissions from construction and maintenance of long lasting infrastructure, as the UHPC design outperforms the normal strength concrete bridge in most impact categories.

  17. 19. Photographer unknown, circa 1950 'THE LOOP OVER' BRIDGE WAS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photographer unknown, circa 1950 'THE LOOP OVER' BRIDGE WAS CONSTRUCTED ON NEWFOUND GAP ROAD TO REPLACE A SERIES OF DANGEROUS SWITCHBACKS. THIS ENGINEERING FEATURE QUICKLY BECAME A POPULAR TOURIST ATTRACTION. - Great Smoky Mountains National Park Roads & Bridges, Gatlinburg, Sevier County, TN

  18. Development and validation of a sensor-based health monitoring model for the Parkview Bridge deck.

    DOT National Transportation Integrated Search

    2012-01-31

    Accelerated bridge construction (ABC) using full-depth precast deck panels is an innovative technique that brings all : the benefits listed under ABC to full fruition. However, this technique needs to be evaluated and the performance of : the bridge ...

  19. Evaluation and analysis of decked bulb T beam bridges.

    DOT National Transportation Integrated Search

    2015-03-01

    A new corrosion-free decked bulb T beam bridge system has been developed to overcome some of the problems : associated with the construction of side-by-side box beam bridges such as the lack of inspection space between : beams and the longitudinal de...

  20. Serviceability-related issues for bridge live load deflection and construction closure pours.

    DOT National Transportation Integrated Search

    2015-06-01

    This study investigated the design criteria and practices in an effort to improve the quality of bridge designs in the : State of Maryland and beyond. This first criterion investigated was the live load deflection for steel bridges. The : second desi...

  1. Evaluation of a highway bridge constructed using high strength lightweight concrete bridge girders.

    DOT National Transportation Integrated Search

    2011-04-01

    The use of high performance concretes to provide longer bridge spans has been limited due to the capacity of existing infrastructure to handle the load of the girders during transportation. The use of High Strength Lightweight Concrete (HSLW) can pro...

  2. Data collection and evaluation of continuity detail for John James Audubon Bridge No. 61390613004101.

    DOT National Transportation Integrated Search

    2014-10-01

    This report summarizes findings from monitoring data that was collected over a two-year period from Bridge No. : 61390613004101 in the John James Audubon Project, which was formerly designated as Bridge #2 prior to : construction completion. The brid...

  3. Serviceability-related issues for bridge live load deflection and construction closure pours : [research summary].

    DOT National Transportation Integrated Search

    2015-06-01

    The Load and Resistance Factor Design (LRFD) method has evolved to become a : more reliable approach to bridge design in the past century. Nevertheless, safety is : always the number one concern in the design of bridge structures. Equally important, ...

  4. 7. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1929, WHITE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1929, WHITE RIVER BRIDGE, BUILT BY ARKANSAS HIGHWAY COMMISSION, DWIGHT BLACKWOOD, CHAIRMAN, JUSTIN MATTHEWS, J. LAN WILLIAMS, J.S. PARKS, SAM J. WILSON, COMMISSIONERS, C.S. CHRISTIAN, STATE HIGHWAY ENGINEER, IRA HEDRICK, INC., CONSULTING ENGINEERS, LIST & WEATHERLY, CONSTRUCTION CO.' - Newport Bridge, Spanning White River at State Highway 14, Newport, Jackson County, AR

  5. Final report for Verglimit at hole-in-the-wall slide section : experimental feature evaluation.

    DOT National Transportation Integrated Search

    1989-06-01

    In 1983, experimental Verglimit overlays were placed on two Oregon bridges known to have icing problems. The performance of the test overlays, constructed on the Salmon River Bridge in Clackamas County and the Quartz Creek Bridge in Clatsop County, w...

  6. Development and validation of a sensor-based health monitoring model for the Parkview Bridge deck : [appendices].

    DOT National Transportation Integrated Search

    2012-01-31

    Accelerated bridge construction (ABC) using full-depth precast deck panels is an innovative technique that brings all the benefits listed under ABC to full fruition. However, this technique needs to be evaluated and the performance of the bridge need...

  7. Bridge-in-a-Backpack(TM). Task 1 : investigation of span lengths up to 70 feet.

    DOT National Transportation Integrated Search

    2011-08-01

    The Bridge-in-a-Backpack has previously been demonstrated with short spans. The first : constructed one, Neal Bridge in Pittsfield, Maine had a span of 34 feet. This task includes : research and development that demonstrates the technology can be ...

  8. Evaluation of a Highway Bridge Constructed Using High Strength Lightweight Concrete Bridge Girders : final report.

    DOT National Transportation Integrated Search

    2011-04-01

    The use of high performance concretes to provide longer bridge spans has been limited due to the capacity of existing infrastructure to handle the load of the girders during transportation. The use of High Strength Lightweight Concrete (HSLW) can pro...

  9. 32. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, April 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION OF SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  10. Implementation of a Precast Inverted T-Beam System in Virginia: Part I : Laboratory Investigations

    DOT National Transportation Integrated Search

    2017-10-01

    The inverted T-beam system provides an accelerated bridge construction alternative for short-to-medium-span bridges. The system consists of adjacent precast inverted T-beams with a cast-in-place concrete topping. This bridge system is not expected to...

  11. Quantification of cracks in concrete bridge decks in Ohio District 3.

    DOT National Transportation Integrated Search

    2012-02-01

    The development of cracks in reinforced bridge decks is a critical problem, not only in Ohio state, but the whole of United States. Many bridge decks constructed within the last 10 years in Ohio have already shown varying levels and patterns of crack...

  12. Quantification of cracks in concrete bridge decks in Ohio district 3.

    DOT National Transportation Integrated Search

    2012-02-01

    The development of cracks in reinforced bridge decks is a critical problem, not only in Ohio state, but the whole of United States. Many bridge decks constructed within the last 10 years in Ohio have already shown varying levels and patterns of crack...

  13. Hardwoods for timber bridges : a national program emphasis by the USDA Forest Service

    Treesearch

    James P. Wacker; Ed Cesa

    2005-01-01

    This paper describes the joint efforts of the Forest Service and the FHWA to administer national programs including research, demonstration bridges, and technology transfer components. Summary information on a number of Forest Service-WIT demonstration bridges constructed with hardwoods is also provided.

  14. 19 CFR 123.18 - Equipment and materials for constructing bridges or tunnels between the United States and Canada...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... or tunnels between the United States and Canada or Mexico. 123.18 Section 123.18 Customs Duties U.S... WITH CANADA AND MEXICO International Traffic § 123.18 Equipment and materials for constructing bridges or tunnels between the United States and Canada or Mexico. (a) Admission of equipment and materials...

  15. 19 CFR 123.18 - Equipment and materials for constructing bridges or tunnels between the United States and Canada...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... or tunnels between the United States and Canada or Mexico. 123.18 Section 123.18 Customs Duties U.S... WITH CANADA AND MEXICO International Traffic § 123.18 Equipment and materials for constructing bridges or tunnels between the United States and Canada or Mexico. (a) Admission of equipment and materials...

  16. 19 CFR 123.18 - Equipment and materials for constructing bridges or tunnels between the United States and Canada...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... or tunnels between the United States and Canada or Mexico. 123.18 Section 123.18 Customs Duties U.S... WITH CANADA AND MEXICO International Traffic § 123.18 Equipment and materials for constructing bridges or tunnels between the United States and Canada or Mexico. (a) Admission of equipment and materials...

  17. Photographic copy of circa 1934, 10” x 15”, black and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of circa 1934, 10” x 15”, black and white aerial photograph. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. AERIAL PHOTOGRAPH OF BRIDGE UNDER CONSTRUCTION LOOKING SOUTH FROM EAST BANK TOWARD WEST BANK SHOWING COMPLETED STEEL RAIL SECTION AND PART OF BRIDGE DECK TRUSS UNDER CONSTRUCTION. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  18. Importance of Topographic Features and Tactical Annotations on Maps Used by Army Aviators for Nap-of-the-Earth Flight.

    DTIC Science & Technology

    1982-01-01

    real word but, instead, are sk-bematic diagrams - stylized, simplified, generalized, and codified presentations of a selected sample of some of the...Turntable/ Roundhouse 3.53 3 Drydock 3.44 7 Barn/Shed 3.41 2 Tailings/Slag Dumps 3.34 5 Bridge Construction Type 3.20 24 Road Name/Number 3.18 7 Bridge...Shaft Mine 3.58 Stockyard 3.54 Turntable/ Roundhouse 3.53 Drydock 3.44 Barn/Shed 3.41 j Tailings/Slag Dumps 3.34 Bridge Construction Type 3.20 Road

  19. Design, construction and load testing of the bridge on Arnault Branch, Washington County, Missouri using innovative technologies.

    DOT National Transportation Integrated Search

    2010-02-01

    The superstructure and instrumentation designs of a three-span bridge are presented in this report. The three spans include a : precast box-girder bridge, a precast deck on steel girder and a precast deck on concrete girder. They were designed to com...

  20. 8. Copyphoto of 1934 aerial photo, view to the east, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Copy-photo of 1934 aerial photo, view to the east, by the U.S. Army Air Corps, showing bridge tender's station and Mud Bayou Railway Bridge under construction - High Island Bridge Tender's Station, State Highway 124 Crossing of Mud Bayou, High Island, Galveston County, TX

  1. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  2. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  3. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  4. Condition assessment and methods of abatement of prestressed concrete box-beam deterioration, phase II : volume 1.

    DOT National Transportation Integrated Search

    2009-04-13

    Side-by-side box-beam bridge constitutes approximately 17 percent of bridges built or replaced annually on : public roads and there is a renewed thrust to use this bridge type for rapid construction under the Highway for : LIFE program. Further, fail...

  5. Evaluation of Erection Procedures of the Horizontally Curved Steel I-Girder Ford City Veterans Bridge

    DOT National Transportation Integrated Search

    2002-03-06

    In the case of horizontally steel curved I-girder bridges, it is important to carefully analyze the erection sequence of the superstructure so as to ensure that difficulties do not arise in the field during construction of the bridge. Generally, prob...

  6. 25 CFR 170.507 - Who reviews bridge inspection reports?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Who reviews bridge inspection reports? 170.507 Section 170.507 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Bridge...

  7. Condition assessment and methods of abatement of prestressed concrete box-beam deterioration, phase II : volume 2.

    DOT National Transportation Integrated Search

    2009-04-13

    Side-by-side box-beam bridge constitutes approximately 17 percent of bridges built or replaced annually on public roads and there is a renewed thrust to use this bridge type for rapid construction under the Highway for LIFE program. Further, failure ...

  8. 37. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. July 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION ON THIRD PANEL OF NORTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  9. 31. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, April 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). INITIAL CONSTRUCTION ON SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  10. 40. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. July 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION OF NORTH ARM, FROM SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  11. 34. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. May 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION ON EIGHT PANEL OF SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  12. 33. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. May 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION OF SOUTH ARM, SHOWING ERECTION TRAVELER. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  13. 19. Photocopy of Blueprint (Original blueprint located in Grays Harbor ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photocopy of Blueprint (Original blueprint located in Grays Harbor County Bridge File No. 4731/0.5 COAST BRIDGE COMPANY'S CONSTRUCTION BLUEPRINT OF 'FLOOR SYSTEM FOR 120' RIVETED SPAN' DATED JULY 1915 - West Wishkah Bridge, West Wishkah Road Spanning Wishkah River Middle Fork, Aberdeen, Grays Harbor County, WA

  14. Structural health monitoring of I-10 twin span bridge - part I : analysis of lateral load test.

    DOT National Transportation Integrated Search

    2014-11-01

    The old I-10 Twin Span Bridge over Lake Pontchartrain was heavily damaged by the storm surges during : Hurricane Katrina in 2005. A new 5.4-mile long replacement bridge was constructed with higher resistance to : extreme events, such as storm surges ...

  15. 78 FR 41689 - Safety Zone; Skagit River Bridge, Skagit River, Mount Vernon, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... Management Facility in Room W12-140 on the ground floor of the Department of Transportation West Building... email LTJG Nathaniel Clinger, Waterways Management Division, Coast Guard Sector Puget Sound; Coast Guard...; thence west back to the point of origin. Vessels wishing to enter the zone must request permission for...

  16. 76 FR 18669 - Safety Zone, Newport River; Morehead City, NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ...-AA00 Safety Zone, Newport River; Morehead City, NC AGENCY: Coast Guard, DHS. ACTION: Notice of proposed... River under the main span US 70/Morehead City--Newport River high rise bridge in Carteret County, NC... Newport River at Morehead City, North Carolina. The contract provides for cleaning, painting, and steel...

  17. 76 FR 23227 - Safety Zone, Newport River; Morehead City, NC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-26

    ...-AA00 Safety Zone, Newport River; Morehead City, NC AGENCY: Coast Guard, DHS. ACTION: Notice of proposed... River under the main span US 70/Morehead City--Newport River high rise bridge in Carteret County, NC... Newport River at Morehead City, North Carolina. The contract provides for cleaning, painting, and steel...

  18. Dissolved silica in the tidal Potomac River and Estuary, 1979-81 water years

    USGS Publications Warehouse

    Blanchard, Stephen F.

    1988-01-01

    The Potomac River at Chain Bridge is the major riverine source of dissolved silica (DSi) to the tidal Potomac River and Estuary. DSi concentrations at Chain Bridge are positively correlated with river discharge; river discharge is an important factor controlling rates of supply, dilution, and residence time. When river flow is high, the longitudinal DSi distribution is conservative. When river flow is low, other processes, such as phytoplankton uptake, benthic flux, resuspension, ground-water discharge, and water-column dissolution of diatoms, tend to be more influential than the river. Elevated concentrations of DSi in sewage-treatment-plant effluent in the Washington, D.C., area raise the DSi concentration of receiving Potomac River water. The tidal river zone serves as a net sink for DSi as a result of phytoplankton uptake. Ultimately, the biogenic silica from the tidal river is transported to the transition zone, where it is mineralized. As a result, the DSi concentration in the transition zone increases during summer. The DSi concentrations in the estuarine zone are largely controlled by dilution by Chesapeake Bay water and by phytoplankton uptake.

  19. 0-6652 : spliced Texas girder bridges.

    DOT National Transportation Integrated Search

    2015-02-01

    Spliced girder technology continues to attract : attention due to its versatility over traditional : prestressed concrete highway bridge construction. : By joining multiple precast concrete girders using : post-tensioning, spliced girder technology :...

  20. Development and Field Testing of a Model to Simulate a Demonstration of Le Chatelier's Principle Using the Wheatstone Bridge Circuit.

    ERIC Educational Resources Information Center

    Vickner, Edward Henry, Jr.

    An electronic simulation model was designed, constructed, and then field tested to determine student opinion of its effectiveness as an instructional aid. The model was designated as the Equilibrium System Simulator (ESS). The model was built on the principle of electrical symmetry applied to the Wheatstone bridge and was constructed from readily…

  1. Government's Construction of the Relation between Parents and Schools in the Upbringing of Children in England: 1963-2009

    ERIC Educational Resources Information Center

    Bridges, David

    2010-01-01

    In this essay David Bridges argues that since most families choose to realize their responsibility for the major part of their children's education through state schools, then the way in which the state constructs parents' relation with these schools is one of its primary levers on parenting itself. Bridges then examines the way in which…

  2. Microdevelopment during an activity-based science lesson

    NASA Astrophysics Data System (ADS)

    Parziale, Jim

    1997-11-01

    The purpose of this study was to describe the microdevelopment of task-related skills during a classroom science activity. Pairs of fifth and pairs of seventh grade students were videotaped as they constructed marshmallow and toothpick bridges. A skill theory based system of analysis was developed and used to detect the construction of new understandings. Patterns of change observed in these understandings were used to infer three means of self-construction: shifts of focus, bridging mechanisms and distributed cognition. Shift of focus is a mechanism used by students to efficiently explore a web of possibilities, collect ideas and make observations for later coordination as new understandings. Bridging mechanisms are partially built conversational structures that scaffolded the construction of higher level thinking structures. Students used the distributed cognition mechanism to test the adaptiveness of their design ideas without the need to fully coordinate an understandings of these designs. An integrated model of these three mechanisms is proposed specific to this task. This model describes how these mechanisms spontaneously emerged and interacted to support the construction of mental representations.

  3. Design Optimization of Hybrid FRP/RC Bridge

    NASA Astrophysics Data System (ADS)

    Papapetrou, Vasileios S.; Tamijani, Ali Y.; Brown, Jeff; Kim, Daewon

    2018-04-01

    The hybrid bridge consists of a Reinforced Concrete (RC) slab supported by U-shaped Fiber Reinforced Polymer (FRP) girders. Previous studies on similar hybrid bridges constructed in the United States and Europe seem to substantiate these hybrid designs for lightweight, high strength, and durable highway bridge construction. In the current study, computational and optimization analyses were carried out to investigate six composite material systems consisting of E-glass and carbon fibers. Optimization constraints are determined by stress, deflection and manufacturing requirements. Finite Element Analysis (FEA) and optimization software were utilized, and a framework was developed to run the complete analyses in an automated fashion. Prior to that, FEA validation of previous studies on similar U-shaped FRP girders that were constructed in Poland and Texas is presented. A finer optimization analysis is performed for the case of the Texas hybrid bridge. The optimization outcome of the hybrid FRP/RC bridge shows the appropriate composite material selection and cross-section geometry that satisfies all the applicable Limit States (LS) and, at the same time, results in the lightest design. Critical limit states show that shear stress criteria determine the optimum design for bridge spans less than 15.24 m and deflection criteria controls for longer spans. Increased side wall thickness can reduce maximum observed shear stresses, but leads to a high weight penalty. A taller cross-section and a thicker girder base can efficiently lower the observed deflections and normal stresses. Finally, substantial weight savings can be achieved by the optimization framework if base and side-wall thickness are treated as independent variables.

  4. Synergy of ASAR and RADARSAT-2 ultra-fine acquisitions for ground deformation monitoring by means of DInSAR and PSI

    NASA Astrophysics Data System (ADS)

    Elias, Panagiotis; Briole, Pierre; Sykioti, Olga

    2010-05-01

    The Gulf of Corinth study area has been long identified as a site of major importance due to its intense past geophysical activity. It is one of the world's most rapidly extending continental regions and it has one of the highest seismicity rates in the Euro-Mediterranean region, having produced a number of earthquakes with magnitude greater than 5.8: Alkyonides (1981, M=6.7), Aigio (1995, Mw=6.1), and Galaxidi (1992, Mw=5.8). Moreover, the geodetic studies conducted, which were based on GPS observations and InSAR calculations, revealed north - south extension rates across the gulf of up to about 1.5 cm year-1 during the last 20 years. Moreover the south coast of the Corinth rift is uplifting whereas the north part is subsiding. The rifting mechanism observed is crucial for the stability of the region as it can lead to submarine slope failures and possible damaging tsunamis. On land, the same fault system causes landslides. The area or the Gulf of Corinth that presents a major scientific and/or socio-economic interest is Patras broader area, the Psathopyrgos fault zone which is considered to be a presently active structure, the Rion-Patras fault zone, the city of Patras and the Rion-Antirion bridge. Psathopyrgos fault zone acts as a transfer zone between the Corinth and Patras rift. Recently on June 8th, 2008 a Mw=6.4 earthquake occurred in NW Peloponnesus, western Greece, at a distance of 17km southwest of the city of Patras. This event is the largest strike-slip earthquake to occur in western Greece during the past 25 years. The days following the main shock, the seismicity were propagating northward towards the city of Patras. Static (Coulomb) stress transfer analysis indicates loading of faults near the city of Patras. Patras is the third most populated city in Greece with more that 200,000 citizens. The bridge of Rion-Antirion is 2,880m long (its width is 28m) and connects the eastern and western Greece. The bridge has been designed and constructed taking into consideration the raised seismisity of the area. The Psathopyrgos fault zone as well as the Rion-Patras transfer fault zone are investigated for any detectable ground deformations that could be indications/precursors or inter-seismic accumulation processes before a main event. The city of Patras are investigated for any detectable ground/buildings deformation due to human interventions or geophysical processes. The potential of Rion-Antirion bridge monitoring for any detectable deformation as well as the surrounding ground on the two edges of it, are also investigated and assessed. The study area presents major difficulties for DInSAR/PSI applications, due to its intense vegetation coverage and high topography presenting various facets, varying high slopes and shadowing effects. Moreover its intense topography in conjunction with its location between Aegean and Ionian seas is leading to high precipitation rates and extend cloud coverage. All these characteristics of the study area contribute to high decorrelation of the interferometric products. For the estimation of the ocuured deformations a series of ASAR/ENVISAT (image swath 2) data are processed by means of PSI and DInSAR techniques, but RADARSAT-2 (ultra-fine beam mode) data are processed only by means of DInSAR technique due to its lack of historical data. The processing will be carried out exploiting commercial and in-house software. The medium and high ground resolution added value products of the acquired data are combined in the thematic level.

  5. Load response and gap formation in a single-row cruciate suture rotator cuff repair.

    PubMed

    Huntington, Lachlan; Richardson, Martin; Sobol, Tony; Caldow, Jonathon; Ackland, David C

    2017-06-01

    Double-row rotator cuff tendon repair techniques may provide superior contact area and strength compared with single-row repairs, but are associated with higher material expenses and prolonged operating time. The purpose of this study was to evaluate gap formation, ultimate tensile strength and stiffness of a single-row cruciate suture rotator cuff repair construct, and to compare these results with those of the Mason-Allen and SutureBridge repair constructs. Infraspinatus tendons from 24 spring lamb shoulders were harvested and allocated to cruciate suture, Mason-Allen and SutureBridge repair groups. Specimens were loaded cyclically between 10 and 62 N for 200 cycles, and gap formation simultaneously measured using a high-speed digital camera. Specimens were then loaded in uniaxial tension to failure, and construct stiffness and repair strength were evaluated. Gap formation in the cruciate suture repair was significantly lower than that of the Mason-Allen repair (mean difference = 0.6 mm, P = 0.009) and no different from that of the SutureBridge repair (P > 0.05). Both the cruciate suture repair (mean difference = 15.7 N/mm, P = 0.002) and SutureBridge repair (mean difference = 15.8 N/mm, P = 0.034) were significantly stiffer than that of the Mason-Allen repair; however, no significant differences in ultimate tensile strength between repair groups were discerned (P > 0.05). The cruciate suture repair construct, which may represent a simple and cost-effective alternative to double-row and double-row equivalent rotator cuff repairs, has comparable biomechanical strength and integrity with that of the SutureBridge repair, and may result in improved construct longevity and tendon healing compared with the Mason-Allen repair. © 2017 Royal Australasian College of Surgeons.

  6. Collision loads on bridge piers : phase 2, report of guidelines for designing bridge piers and abutments for vehicle collisions

    DOT National Transportation Integrated Search

    2011-03-01

    An instrumented, simulated bridge pier was constructed, and two full-scale collisions with an : 80,000-lb van-type tractor-trailer were performed on it. The trailer was ballasted with bags of sand on : pallets. The simulated pier was 36 inches in dia...

  7. Bulb-T beams with self-consolidating concrete on the Route 33 bridge over the Pamunkey River in Virginia.

    DOT National Transportation Integrated Search

    2008-01-01

    This study evaluated the bulb-T beams made with self-consolidating concrete (SCC) used in the Route 33 Bridge over the Pamunkey River at West Point, Virginia. Before the construction of the bridge, two test beams with SCC similar in cross section to ...

  8. 33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...

  9. 33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...

  10. 33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...

  11. 33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...

  12. 33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...

  13. 38. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. July 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). VIEW FROM CANYON OF THIRD PANEL OF NORTH ARM UNDER CONSTRUCTION. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  14. 35. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, June 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). ELEVENTH (LAST) PANEL OF SOUTH ARM UNDER CONSTRUCTION, SHOWING ERECTION TRAVELER. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  15. Standard plans for southern pine bridges

    Treesearch

    P. D. Hilbrich Lee; M. A. Ritter; M. H. Triche

    1995-01-01

    The development of standardized timber bridge plans and specifications is a key element in improving design and construction practices. The bridge plans presented were developed as a cooperative effort between the USDA Forest Service, Forest Products Laboratory (FPL); the University of Alabama; and the Southern Pine Council and are the first step in developing...

  16. 7. Historic American Buildings Survey W. N. Manning, Photographer, January ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Historic American Buildings Survey W. N. Manning, Photographer, January 5, 1935 VIEW SHOWING INNER CONSTRUCTION OF BRIDGE - Covered Bridge, Spanning Choccolocco Creek , Old Eastaboga, Talladega County, AL

  17. 2. Historic American Buildings Survey W. N. Manning, Photographer, January ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Historic American Buildings Survey W. N. Manning, Photographer, January 5, 1935 VIEW SHOWING UNDER CONSTRUCTION OF BRIDGE - Covered Bridge, Spanning Choccolocco Creek , Old Eastaboga, Talladega County, AL

  18. Five-year clinical evaluation of zirconia-based bridges in patients in UK general dental practices.

    PubMed

    Burke, F J T; Crisp, R J; Cowan, A J; Lamb, J; Thompson, O; Tulloch, N

    2013-11-01

    This study reported the results at 5 years of fixed-fixed all-ceramic bridges, constructed in a yttria oxide stabilized tetragonal zirconium oxide polycrystal (Y-TZP) substructure, placed in adult patients in UK general dental practices. Four UK general dental practitioners recruited patients who required fixed bridgework and, after obtaining informed written consent, appropriate clinical and radiographic assessments were completed. The teeth were prepared and bridges constructed in accordance with the manufacturer's instructions. Each bridge was reviewed annually within 3 months of the anniversary of its placement by a calibrated examiner, together with the clinician who had placed the restoration, using modified USPHS criteria. Of the 41 bridges originally placed, 33 bridges were examined at 5 years. All Y-TZP frameworks were intact and no bridge retainers had debonded. Eight chipping fractures in the veneering ceramic were noted over the 5-year period. In five cases the patients were unaware of these and these cases were polished. Of the remaining three cases, in one a repair was attempted but was unsuccessful, but the bridge remained in satisfactory service. However, in the case involving a chipping fracture of the mesial-incisal angle of a central incisor, it was considered that replacement of the bridge was necessary. 97% (n=32) of the 33 Lava Y-TZP fixed-fixed bridges, evaluated in patients attending UK general dental practices, were found to be performing satisfactorily. The use of Y-TZP frameworks holds promise. Copyright © 2013 Elsevier Ltd. All rights reserved.

  19. Fatal accidents in nighttime vs. daytime highway construction work zones.

    PubMed

    Arditi, David; Lee, Dong-Eun; Polat, Gul

    2007-01-01

    Awareness about worker safety in nighttime construction has been a major concern because it is believed that nighttime construction creates hazardous work conditions. However, only a few studies provide valuable comparative information about accident characteristics of nighttime and daytime highway construction activities. This study investigates fatal accidents that occurred in Illinois highway work zones in the period 1996-2001 in order to determine the safety differences between nighttime and daytime highway construction. The lighting and weather conditions were included into the study as control parameters to see their effects on the frequency of fatal accidents occurring in work zones. According to this study, there is evidence that nighttime construction is more hazardous than daytime construction. The inclusion of a weather parameter into the analysis has limited effect on this finding. The study justifies establishing an efficient work zone accident reporting system and taking all necessary measures to enhance safety in nighttime work zones.

  20. The future of rapid bridge deck replacement.

    DOT National Transportation Integrated Search

    2015-06-01

    Replacing aging, deteriorated infrastructure often requires road closures and traffic detours which impose : inconvenience and delay on commerce and members of the motoring public. Accelerated bridge construction : techniques often use precast member...

Top