77 FR 63732 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-17
...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the Demolition Project on the Cline Avenue Bridge... vessels from the hazards associated with the demolition project on the Cline Avenue bridge, which are...
77 FR 72957 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-07
...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the demolition Project on the Cline Avenue Bridge... associated with the demolition project on the Cline Avenue bridge, which are discussed further below. Under 5...
77 FR 65818 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-31
...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the Demolition Project on the Cline Avenue Bridge... demolition project on the Cline Avenue Bridge, which are discussed further below. Under 5 U.S.C. 553(d)(3...
77 FR 70684 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-27
...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the demolition Project on the Cline Avenue Bridge... bridge, which are discussed further below. Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good...
78 FR 2616 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-14
...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the demolition Project on the Cline Avenue Bridge... Bridge, which are discussed further below. Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good...
76 FR 32313 - Safety Zone; Chelsea St. Bridge Demolition, Chelsea River, Chelsea, MA
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-06
...-AA00 Safety Zone; Chelsea St. Bridge Demolition, Chelsea River, Chelsea, MA AGENCY: Coast Guard, DHS... Sector Boston Captain of the Port (COTP) Zone for the demolition of the Chelsea St. Bridge. This safety... Chelsea St. Bridge during the operations surrounding the bridge's demolition and removal. Discussion of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-02
... Regulated Navigation Area; Greenville Bridge Demolition, Lower Mississippi River Mile 531.3, AR, MS AGENCY... permitted to be in this area at certain times during the demolition of the Greenville Bridge, Lower... safety hazards during the demolition of the Greenville Bridge, Lower Mississippi River Mile 531.3. DATES...
75 FR 73962 - Safety Zone; Bridge Demolition; Illinois River, Seneca, IL
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-30
...-AA00 Safety Zone; Bridge Demolition; Illinois River, Seneca, IL AGENCY: Coast Guard, DHS. ACTION... due to the demolition of the Seneca Highway Bridge. This temporary safety zone is necessary to protect... Highway Bridge. DATES: This rule is effective in the CFR on November 30, 2010 through 6 a.m. on December...
DOT National Transportation Integrated Search
2017-06-01
In this project, Florida International University researchers used segments from a demolished concrete segmental bridge with internal tendons to study damage to post-stressed tendons and to test the effectiveness of various methods of non-destructive...
16. DETAIL VIEW OF BRIDGE DECK DURING DEMOLITION, SHOWING EXTRADOSAL ...
16. DETAIL VIEW OF BRIDGE DECK DURING DEMOLITION, SHOWING EXTRADOSAL REINFORCING BARS OF PATENTED THACHER TYPE, AND PLAIN TRANSVERSE BARS CONNECTING EXTRADOSAL AND INTRADOSAL REINFORCEMENTS - Sanderson Avenue Bridge, Sanderson Avenue spanning Lackawanna River, Scranton, Lackawanna County, PA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-21
... 1625-AA11 Regulated Navigation Area; Waldo-Hancock Bridge Demolition, Penobscot River, Between Prospect... River between Prospect and Verona, ME, under and surrounding the Waldo- Hancock Bridge in order to facilitate the removal of the trusses, cables, and towers of the Waldo-Hancock Bridge. This temporary final...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-06
... 1625-AA00 Safety Zone; Alliance Road Bridge Demolition; Black Warrior River, Locust Fork; Birmingham... of the Alliance Road Bridge (Co. Rd. 61). Entry into, transiting or anchoring in this zone is.... [[Page 66542
An ecological assessment of a bridge demolition.
DOT National Transportation Integrated Search
1975-01-01
Bridge demolition has long been known to mobilize large amounts of stream sediment in the immediate area of the structure. An ecological assessment in terms of stream macroinvertebrate samples and suspended solids measurements was made shortly before...
75 FR 3372 - Safety Zone: Congress Street Bridge, Pequonnock River, Bridgeport, CT
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-21
...-AA00 Safety Zone: Congress Street Bridge, Pequonnock River, Bridgeport, CT AGENCY: Coast Guard, DHS... waters surrounding the Congress Street Bridge over the Pequonnock River in Bridgeport, Connecticut. This... and equipment that are being utilized for partial demolition of the Congress Street Bridge. Entry into...
Spray and dust hang in the air, as the demolition ...
Spray and dust hang in the air, as the demolition is completed. Only the southeast pier remains standing at right. View is to southeast from confluence of Trinity and South Fork Trinity Rivers - South Fork Trinity River Bridge, State Highway 299 spanning South Fork Trinity River, Salyer, Trinity County, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-27
...-AA00 Safety Zone; Extended Debris Removal in the Lake Champlain Bridge Construction Zone (Between... surrounding the Lake Champlain Bridge construction zone between Chimney Point, VT and Crown Point, NY. This... of debris from the old Crown Point bridge demolition. The debris must be cleared from the navigable...
Interior of during demolition; the brick structure in the middle ...
Interior of during demolition; the brick structure in the middle housed the electric motors that ran the rolling mill (the motor house and rolling mills date from the early twentieth century) - Bethlehem Steel Corporation, South Bethlehem Works, Rolling Mill, Along Lehigh River, North of Fourth Street, West of Minsi Trail Bridge, Bethlehem, Northampton County, PA
Methods for removing concrete decks from bridge girders.
DOT National Transportation Integrated Search
2014-08-01
With ever tightening budgets and limitations of demolition equipment, states are looking for cost-effective, reliable, and : sustainable methods for removing concrete decks from bridges. : The goal of this research was to explore such methods. The re...
Controlled Blasting for Deconstruction of a Railway Bridge Near Sahibganj
NASA Astrophysics Data System (ADS)
Mandal, S. K.; Ghosh, A. K.; Oraon, S.
2018-06-01
Some of the Indian Railway bridges require reconstruction for electrification and expansion of railway tracks. Dismantling of bridge within time schedule in densely populated area requires controlled and pre-planned blasting methodology for safe pulling down of the structure and quick removal of blasted debris for fast restoration of tracks and smooth plying of trains. The three arched railway bridge (Bridge No. 61) located between Sahibganj and Karamtola cases one such example where the bridge was dismantled and the track was restored within 4 h of blasting, though the stipulated block period for demolition and restoration of tracks was 6 h. The 25.48 m long three-arched bridge was drilled and blasted with 225 number of blastholes (32 mm diameter) and 100 kg explosive (25 mm diameter). Length of blastholes varied between 0.5 and 1.8 m with blast geometry of 0.3-0.35 m burden and 0.33 m spacing. This paper deals with the conceptual and theoretical model developed for identification of the key locations for drilling and implementation of the same. It also discusses about the precautionary measures and the drilling pattern adopted for quick demolition and speedy restoration of tracks.
Controlled Blasting for Deconstruction of a Railway Bridge Near Sahibganj
NASA Astrophysics Data System (ADS)
Mandal, S. K.; Ghosh, A. K.; Oraon, S.
2018-02-01
Some of the Indian Railway bridges require reconstruction for electrification and expansion of railway tracks. Dismantling of bridge within time schedule in densely populated area requires controlled and pre-planned blasting methodology for safe pulling down of the structure and quick removal of blasted debris for fast restoration of tracks and smooth plying of trains. The three arched railway bridge (Bridge No. 61) located between Sahibganj and Karamtola cases one such example where the bridge was dismantled and the track was restored within 4 h of blasting, though the stipulated block period for demolition and restoration of tracks was 6 h. The 25.48 m long three-arched bridge was drilled and blasted with 225 number of blastholes (32 mm diameter) and 100 kg explosive (25 mm diameter). Length of blastholes varied between 0.5 and 1.8 m with blast geometry of 0.3-0.35 m burden and 0.33 m spacing. This paper deals with the conceptual and theoretical model developed for identification of the key locations for drilling and implementation of the same. It also discusses about the precautionary measures and the drilling pattern adopted for quick demolition and speedy restoration of tracks.
Best management practices for storage of historic metal truss bridges.
DOT National Transportation Integrated Search
2014-07-01
As part of a 2002 agreement with the FHWA, GDOT has committed to consider storing metal truss : bridges of historic value in lieu of demolition, until a recipient could be located. This research addresses the most : effective processes for storage of...
Phased Demolition of an Occupied Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brede, Lawrence M.; Lauterbach, Merl J.; Witt, Brandon W.
2008-01-15
The U.S. government constructed the K-1401 facility in the late 1940's as a support building for various projects supporting the uranium gaseous diffusion process. In 2004 the U.S. Department of Energy authorized Bechtel Jacobs Company, LLC (BJC) to decontaminate and demolish the facility. The K-1401 facility was used for a variety of industrial purposes supporting the gaseous diffusion process. Many different substances were used to support these processes over the years and as a result different parts of the facility were contaminated with fluorine, chlorine trifluoride, uranium and technetium radiological contamination, asbestos, and mercury. The total facility area is 46,015more » m{sup 2} (495,000 sf) including a 6,800 m{sup 2} basement (73,200 sf). In addition to the contamination areas in the facility, a large portion was leased to businesses for re-industrialization when the D and D activities began. The work scope associated with the facility included purging and steam cleaning the former fluorine and chlorine trifluoride systems, decontaminating loose radiologically contaminated and mercury spill areas, dismantling former radiological lines contaminated with uranium oxide compounds and technetium, abating all asbestos containing material, and demolishing the facility. These various situations contributed to the challenge of successfully conducting D and D tasks on the facility. In order to efficiently utilize the work force, demolition equipment, and waste hauling trucks the normal approach of decontaminating the facility of the hazardous materials, and then conducting demolition in series required a project schedule of five years, which is not cost effective. The entire project was planned with continuous demolition as the goal end state. As a result, the first activities, Phase 1, required to prepare sections for demolition, including steam cleaning fluorine and chlorine trifluoride process lines in basement and facility asbestos abatement, were conducted while the tenants who were leasing floor space in the facility moved out. Upon completion of this phase the facility was turned over to the demolition project and the most hazardous materials were removed from the facility. Phase 2 activities included removing the process gas lines from sections C/D/E while decontaminating and preparing sections A and B for demolition. Demolition preparation activities include removing transit siding and universal waste from the area. Phase 3 began with demolition activities in sections A and B1 while continuing process gas line removal from sections C/D/E, as well as conducting demolition preparation activities to these sections. Area B was split into two sections, allowing demolition activities to occur in section B1 while personnel could still access the upper floor in sections C, D, and E. Once demolition began in section B2, personnel entry was only authorized in the basement. This timeline initiated phase 4, and the project completed cleaning the process components from the basement while section B2 demolition began. The final phase, phase 5, began once the basement was cleared. Final demolition activities began on sections C, D, E, and the basement. This material will ship for disposal and is scheduled for completion during FY07. Because the project was able to successfully phase demolition activities, the total facility demolition schedule was reduced by half to 2-1/2 years. The project was able to move portions of the demolition schedule from working in series to working in parallel, allowing the job to deliver facility demolition debris to ship for disposal 'just in time' as the facility was demolished.« less
DOT National Transportation Integrated Search
2017-05-01
The service life and durability of prestressed concrete in bridges are vulnerable to corrosion damages due to many factors such as construction, material, and environment. To ensure public safety, it is important to inspect these structures and to de...
24 CFR 970.15 - Specific criteria for HUD approval of demolition requests.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING PROJECTS § 970.15 Specific criteria for HUD approval of demolition requests. (a) In addition to... public housing project must certify that the project: (1) Is obsolete as to physical condition, location... modifications is cost-effective to return the public housing project or portion of the project to useful life...
DEMOLISHING A COLD WARE ERA FULE STORAGE BASIN SUPERSTRUCTURE LADEN WITH ASBESTOS
DOE Office of Scientific and Technical Information (OSTI.GOV)
LLOYD ER; STEVENS JM; DAGAN EB
The K East (KE) Basin facilities are located near the north end of the Hanford Site's 100 K area. The facilities were built in 1950 as part of the KE Reactor complex and constructed within 400 meters of the Columbia River, which is the largest river in the Pacific Northwest and by volume the fourth largest river in the United States. The basin, located adjacent to the reactor, was used for the underwater storage of irradiated nuclear fuel discharged from the reactor. The basin was covered by a superstructure comprising steel columns and beams, concrete, and cement asbestos board (CAB)more » siding. The project's mission was to complete demolition of the structure over the KE Basin within six months of turnover from facility deactivation activities. The demolition project team applied open-air demolition techniques to bring the facility to slab-on-grade. Several innovative techniques were used to control contamination and maintain contamination control within the confines of the demolition exclusion zone. The techniques, which focused on a defense-in-depth approach, included spraying fixatives on interior and exterior surfaces before demolition began; applying fixatives during the demolition; misting using a fine spray of water during demolition; and demolishing the facility systematically. Another innovative approach that made demolition easier was to demolish the building with the non-friable CAB remaining in place. The CAB siding covered the exterior of the building and portions of the interior walls, and was an integral part of the multiple-layered roof. The project evaluated the risks involved in removing the CAB material in a radiologically contaminated environment and determined that radiological dose rates and exposure to radiological contamination and industrial hazards would be significantly reduced by using heavy equipment to remove the CAB during demolition. The ability to perform this demolition safely and without spreading contamination (radiological or asbestos) demonstrates that contaminated structures can be torn down successfully using similar open-air demolition techniques.« less
DEMOLISHING A COLD-WAR-ERA FUEL STORAGE BASIN SUPERSTRUCTURE LADEN WITH ASBESTOS
DOE Office of Scientific and Technical Information (OSTI.GOV)
LLOYD ER; ORGILL TK; DAGAN EB
The K East (KE) Basin facilities are located near the north end of the Hanford Site's 100 K area. The facilities were built in 1950 as part of the KE Reactor complex and constructed within 400 meters of the Columbia River, which is the largest river in the Pacific Northwest and by volume the fourth largest river in the United States. The basin, located adjacent to the reactor, was used for the underwater storage of irradiated nuclear fuel discharged from the reactor. The basin was covered by a superstructure comprising steel columns and beams, concrete, and cement asbestos board (CAB)more » siding. The project's mission was to complete demolition of the structure over the K East basin within six months of tumover from facility deactivation activities. The demolition project team implemented open-air demolition techniques to demolish the facility to slab-on-grade. Several innovative techniques were used to control contamination and maintain contamination control within the confines of the demolition exclusion zone. The techniques, which focused on a defense-in-depth approach, included spraying fixatives on interior and exterior surfaces before demolition began; applying fixatives; misting using a fine spray of water during demolition; and demolishing the facility systematically. Another innovation that aided demolition was to demolish the building with the non-friable CAB remaining in place. The CAB siding covered the exterior of the building, portions of the interior walls, and was an integral part of the multiple layered roof. The project evaluated the risks involved in removing the CAB material in a radiologically contaminated environment and determined that radiological dose rates and exposure to radiological contamination and industrial hazards would be significantly reduced by removing the CAB during demolition using heavy equipment. The ability to perform this demolition safely and without spreading contamination (radiological or asbestos) demonstrates that similar open-air demolition ofcontaminated structures can be performed successfully.« less
2003-03-04
KENNEDY SPACE CENTER, FLA. -- -- Lifting their shovels for the groundbreaking of the Operations Support Building II are (left to right) Bill Pickavance, Vice President & Deputy Program Manager Florida Operations, United Space Alliance; Mike Wetmore, director of Shuttle Processing; Miguel Morales, chief, Facilities Division, Spaceport Services; Mike Sumner, chief of operations, Spaceport Services; David Wolfberg, designer of the facility, with Architect and Engineers Wolfberg, Alvarez and Partners of Coral Gables; Roy Bridges, KSC director; and Don Minderman, OSB II project manager, Spaceport Services. Not shown: David Boland, David Boland Inc.(construction company). The new building will replace modular housing constructed more than 20 years ago and house NASA and contractor support staff for shuttle operations. The demolition of the modular buildings has begun and construction will immediately follow. The new structure is projected to be ready in April 2005.
NASA Technical Reports Server (NTRS)
2003-01-01
KENNEDY SPACE CENTER, FLA. -- -- Lifting their shovels for the groundbreaking of the Operations Support Building II are (left to right) Bill Pickavance, Vice President & Deputy Program Manager Florida Operations, United Space Alliance; Mike Wetmore, director of Shuttle Processing; Miguel Morales, chief, Facilities Division, Spaceport Services; Mike Sumner, chief of operations, Spaceport Services; David Wolfberg, designer of the facility, with Architect and Engineers Wolfberg, Alvarez and Partners of Coral Gables; Roy Bridges, KSC director; and Don Minderman, OSB II project manager, Spaceport Services. Not shown: David Boland, David Boland Inc.(construction company). The new building will replace modular housing constructed more than 20 years ago and house NASA and contractor support staff for shuttle operations. The demolition of the modular buildings has begun and construction will immediately follow. The new structure is projected to be ready in April 2005.
Calder Hall Cooling Tower Demolition: Landmark Milestone for Decommissioning at Sellafield
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williamson, E.J.
2008-07-01
September 2007 saw a very visible change to the Sellafield site following the culmination of a major decommissioning project; the demolition of the four Calder Hall cooling towers. A key part of the UK's nuclear industrial heritage, Calder Hall, the world's first commercial nuclear power station, was opened by Her Majesty Queen Elizabeth II in October 1953 and continued to generate electricity until its closure in 2003. Following the decision to decommission the Calder Hall site, explosive demolition was identified as the safest and most cost effective route for the removal of the towers. The technique, involving the placement ofmore » explosive in 60% of the circumference of both shell and legs, is a tried and tested method which had already been used successfully in more than 200 cooling towers in the UK in the last 30 years. The location and composition of the four 88 metre high towers also created additional challenges. Situated only 40 metres away from the UK's only nuclear Fuel Handling Plant, as well as other sensitive structures on the Sellafield site, the project had to address the impact of a number of key areas, including dust, ground vibration and air over pressure, to ensure that the demolition could be carried out safely and without significant impact on other operational areas on the site. At the same time, the towers had to be prepared for demolition in a way that minimised the amounts of radioactive or hazardous waste materials arising. This paper follows the four year journey from the initial decision to demolish the towers right through to the demolition itself as well as the clean up of the site post demolition. It will also consider the massive programme of work necessary not only to carry out the physical work safely but also to gain regulatory confidence and stakeholder support to carry out the project successfully. In summary: The demolition of the four Calder Hall cooling towers was a highly visible symbol of the changes that are occurring on the Sellafield site as it moves forward towards a decommissioning future. Although in itself the demolition was both straightforward and standard, the various complexities posed by the towers situation at Sellafield introduced an entirely new element to the project, with a number of complex challenges which had to be overcome or resolved before the demolition could take place. It is a testament to the skill and dedication of the project team and its associated contractors that the project was delivered safely and successfully without a single accident, injury or event throughout the entire four years, and with minimal impact on both site operations and the local community. (authors)« less
A1297 hydro demolition video versus GPR results : west bound lane.
DOT National Transportation Integrated Search
2014-03-01
This research has examined the use of nondestructive techniques for concrete bridge deck condition : assessments. The primary nondestructive testing/evaluation (NDT/NDE) technique utilized in this research : was ground-coupled ground penetrating rada...
A1193 hydro demolition video versus GPR results : east bound lane.
DOT National Transportation Integrated Search
2014-03-01
This research has examined the use of nondestructive techniques for concrete bridge deck condition : assessments. The primary nondestructive testing/evaluation (NDT/NDE) technique utilized in this research : was ground-coupled ground penetrating rada...
A1297 hydro demolition video versus GPR results : east bound lane.
DOT National Transportation Integrated Search
2014-03-01
This research has examined the use of nondestructive techniques for concrete bridge deck condition : assessments. The primary nondestructive testing/evaluation (NDT/NDE) technique utilized in this research : was ground-coupled ground penetrating rada...
Deterioration of J-bar reinforcement in abutments and piers.
DOT National Transportation Integrated Search
2011-12-31
Deterioration and necking of J-bars has been reportedly observed at the interface of the footing and stem wall during the demolition : of older retaining walls and bridge abutments. Similar deterioration has been reportedly observed between the pier ...
Quantifying construction and demolition waste: an analytical review.
Wu, Zezhou; Yu, Ann T W; Shen, Liyin; Liu, Guiwen
2014-09-01
Quantifying construction and demolition (C&D) waste generation is regarded as a prerequisite for the implementation of successful waste management. In literature, various methods have been employed to quantify the C&D waste generation at both regional and project levels. However, an integrated review that systemically describes and analyses all the existing methods has yet to be conducted. To bridge this research gap, an analytical review is conducted. Fifty-seven papers are retrieved based on a set of rigorous procedures. The characteristics of the selected papers are classified according to the following criteria - waste generation activity, estimation level and quantification methodology. Six categories of existing C&D waste quantification methodologies are identified, including site visit method, waste generation rate method, lifetime analysis method, classification system accumulation method, variables modelling method and other particular methods. A critical comparison of the identified methods is given according to their characteristics and implementation constraints. Moreover, a decision tree is proposed for aiding the selection of the most appropriate quantification method in different scenarios. Based on the analytical review, limitations of previous studies and recommendations of potential future research directions are further suggested. Copyright © 2014 Elsevier Ltd. All rights reserved.
Bat Surveys of Retired Facilitiies Scheduled for Demolition by Washington Closure Hanford
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gano, K. A.; Lucas, J. G.; Lindsey, C. T.
2011-06-30
This project was conducted to evaluate buildings and facilities remaining in the Washington Closure Hanford (WCH) deactivation, decontamination, decommissioning, and demolition schedule for bat roost sites. The project began in spring of 2009 and was concluded in spring of 2011. A total of 196 buildings and facilities were evaluated for the presence of bat roosting sites. The schedule for the project was prioritized to accommodate the demolition schedule. As the surveys were completed, the results were provided to the project managers to facilitate planning and project completion. The surveys took place in the 300 Area, 400 Area, 100-H, 100-D, 100-N,more » and 100-B/C Area. This report is the culmination of all the bat surveys and summarizes the findings by area and includes recommended mitigation actions where bat roosts were found.« less
Asbestos release from whole-building demolition of buildings with asbestos-containing material.
Perkins, Robert A; Hargesheimer, John; Fourie, Walter
2007-12-01
The whole-building demolition method, which entails one-or two-story buildings pushed down by heavy equipment, loaded into trucks, and hauled away, is generally the most cost-effective means to remove small buildings. For taller buildings, a crane and wrecking ball may be used initially to reduce the height of the building. Demolitions might release asbestos fibers from friable asbestos-containing material (ACM). Fibers also might be released from nominally nonfriable ACM (Categories I and II nonfriable ACM) if it becomes friable after rough handling throughout the whole-building demolition process. This paper reports on asbestos air monitoring from two demolition projects involving ACM. In one building, Category II nonfriable ACM was present because it could not be removed safely prior to demolition. Both projects had large quantities of gypsum wallboard with ACM joint compound and ACM flooring. One building had large quantities of ACM spray-on ceiling material. During the demolitions personal air monitoring of the workers and area air monitoring downwind and around the sites were conducted. The monitoring found the concentrations of fibers detected by phase contrast microscopy were generally well below the permissible exposure limits (PEL) of workers. Electron microcopy analysis of samples at or near the PEL indicated most of the fibers were not asbestos, and the actual asbestos exposure was often below the detection limit of the procedure. The buildings were kept wet with fire hoses during the demolition and that required large quantities of water, 20,000-60,000 gal/day (75-225 m(3)/day). Earlier studies found little asbestos release from buildings containing only nonfriable ACM demolished by this method. This project found a negligible release of asbestos fibers, despite the presence of nonfriable materials that might become friable, such as ACM joint compound and spray-on ACM ceiling coating.
Determining the depth of hydro demolition using Lidar methods.
DOT National Transportation Integrated Search
2014-02-01
Missouri S&T was contracted to conduct research on the effectiveness of using ground-penetrating radar (GPR) to assess several : highway bridges in rural Missouri. The assessment was to be based on the principle that sound concrete has a different de...
Methodology to Estimate the Quantity, Composition, and ...
This report, Methodology to Estimate the Quantity, Composition and Management of Construction and Demolition Debris in the US, was developed to expand access to data on CDD in the US and to support research on CDD and sustainable materials management. Since past US EPA CDD estimates have been limited to building-related CDD, a goal in the development of this methodology was to use data originating from CDD facilities and contractors to better capture the current picture of total CDD management, including materials from roads, bridges and infrastructure. This report, Methodology to Estimate the Quantity, Composition and Management of Construction and Demolition Debris in the US, was developed to expand access to data on CDD in the US and to support research on CDD and sustainable materials management. Since past US EPA CDD estimates have been limited to building-related CDD, a goal in the development of this methodology was to use data originating from CDD facilities and contractors to better capture the current picture of total CDD management, including materials from roads, bridges and infrastructure.
Correspondence about the Applicability of Asbestos NESHAP to Residential Demolition Projects
These correspondence about the asbestos NESHAP provide clarification on some demolition concerns such as the definition of a facility, the definition of site, and ownership applicability for renovations conducted on buildings after resale.
Code of Federal Regulations, 2011 CFR
2011-04-01
... maximum project cost, as described in § 941.306: (1) Demolition of, or remediation of environmental... utility systems, and replacement of off-site underground utility systems, extensive rock and/or soil... preparation), administration, site acquisition, relocation, demolition of, and site remediation of...
Report: Significant Modifications Needed To Ensure Success of Fort Worth Asbestos Demolition Method
Report #2004-P-00002, December 19, 2003. According to the Environmental Protection Agency's (EPA) National Asbestos Registry System, over 166,000 asbestos demolition and/or renovation projects were conducted in the last two years.
Construction and demolition waste generation rates for high-rise buildings in Malaysia.
Mah, Chooi Mei; Fujiwara, Takeshi; Ho, Chin Siong
2016-12-01
Construction and demolition waste continues to sharply increase in step with the economic growth of less developed countries. Though the construction industry is large, it is composed of small firms with individual waste management practices, often leading to the deleterious environmental outcomes. Quantifying construction and demolition waste generation allows policy makers and stakeholders to understand the true internal and external costs of construction, providing a necessary foundation for waste management planning that may overcome deleterious environmental outcomes and may be both economically and environmentally optimal. This study offers a theoretical method for estimating the construction and demolition project waste generation rate by utilising available data, including waste disposal truck size and number, and waste volume and composition. This method is proposed as a less burdensome and more broadly applicable alternative, in contrast to waste estimation by on-site hand sorting and weighing. The developed method is applied to 11 projects across Malaysia as the case study. This study quantifies waste generation rate and illustrates the construction method in influencing the waste generation rate, estimating that the conventional construction method has a waste generation rate of 9.88 t 100 m -2 , the mixed-construction method has a waste generation rate of 3.29 t 100 m -2 , and demolition projects have a waste generation rate of 104.28 t 100 m -2 . © The Author(s) 2016.
NASA Astrophysics Data System (ADS)
Sara, Balazs; Antonini, Ernesto; Tarantini, Mario
2001-02-01
The VAMP project (VAlorization of building demolition Materials and Products, LIFE 98/ENV/IT/33) aims to build an effective and innovative information system to support decision making in selective demolition activity and to manage the valorization (recovery-reuse-recycling) of waste flows produced by the construction and demolition (C&D) sector. The VAMP information system will be tested it in Italy in some case studies of selective demolition. In this paper the proposed demolition-valorization system will be compared to the traditional one in a life cycle perspective, applying LCA methodology to highlight the advantages of VAMP system from an eco-sustainability point of view. Within the system boundaries demolition processes, transport of demolition wastes and its recovery/treatment or disposal in landfill were included. Processes avoided due to reuse-recycling activities, such as extraction of natural resources and manufacture of building materials and components, were considered too. In this paper data collection procedure applied in inventory and impact assessment phases and a general overview about data availability for LCA studies in this sector are presented. Results of application of VAMP methodology to a case study are discussed and compared with a simulated traditional demolition of the same building. Environmental advantages of VAMP demolition-valorization system are demonstrated quantitatively emphasizing the special importance of reuse of building components with high demand of energy for manufacture.
This document provides background information on how the sustainable reuse of brownfield properties includes efforts to reduce the environmental impact by reusing and recycling materials generated during building construction, demolition, or renovation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, K.D.
2006-07-01
Nuclear facility decontamination, dismantlement, and demolition activities provide a myriad of challenges along the path to reaching a safe, effective, and compliant decommissioning. Among the challenges faced during decommissioning, is the constant management and technical effort to eliminate, mitigate, or minimize the potential of risks of radiation exposures and other hazards to the worker, the surrounding community, and the environment. Management strategies to eliminate, mitigate, or minimize risks include incorporating strong safety and As Low As Reasonably Achievable (ALARA) principles into an integrated work planning process. Technical and operational strategies may include utilizing predictive risk analysis tools to establish contaminationmore » limits for demolition and using remote handling equipment to reduce occupational and radiation exposures to workers. ECC and E2 Closure Services, LLC (Closure Services) have effectively utilized these management and technical tools to eliminate, mitigate, and reduce radiation exposures under contract to the U.S. Department of Energy (DOE) for the decontamination and decommissioning Columbus Closure Project (CCP). In particular, Closure Services achieved significant dose reduction during the dismantling, decontamination, and demolition activities for Building JN-1. Management strategies during the interior dismantlement, decontamination, and demolition of the facility demanded an integrated work planning processes that involved project disciplines. Integrated planning processes identified multiple opportunities to incorporate the use of remote handling equipment during the interior dismantling and demolition activities within areas of high radiation. Technical strategies employed predictive risk analysis tools to set upper bounding contamination limits, allowed for the radiological demolition of the building without exceeding administrative dose limits to the worker, general public, and the environment. Adhering to management and technical strategies during the dismantlement, decontamination, and demolition of Building JN-1 enabled Closure Services to achieve strong ALARA performance, maintain absolute compliance under the regulatory requirements and meeting licensing conditions for decommissioning. (authors)« less
Environmental impact assessment and eco-friendly decision-making in civil structures.
Kim, Sang-Hyo; Choi, Moon-Seock; Mha, Ho-Seong; Joung, Jung-Yeun
2013-09-15
This study develops two useful procedures in performing an environmental-impact assessment. One is the advanced life-cycle assessment (LCA) method, which effectively tracks the flow of materials and considers the recycling and demolition of a civil structure. The other is an eco-friendly decision-making procedure, which may effectively apply when determining the prototype of a civil structure. The advanced LCA method differs from traditional LCA procedure, as it classifies the input material prior to the impact assessment. Classification work is performed to establish independent life-cycle stages for each material. The processes of recycling and demolition are appropriately added to the life-cycle stages. The impact assessment is performed separately for the materials, and results are aggregated at the end of the analysis. The eco-friendly decision-making procedure enables designers to choose an economical, and environmentally friendly, alternative during the planning phase of the construction project. This procedure rationally amalgamates economical value and environmental effects into a single indicator. The life cycle cost (LCC) of a structure can be analysed by using conventional LCC tools, whereas the environmental impact is estimated by LCA. The results from LCC and LCA are then integrated by using either a CO2 conversion method or an analytical hierarchy process (AHP). The CO2 conversion method presents the result as a monetary value, whereas the AHP presents the result as a non-dimensional value. A practical example using a steel box girder bridge and a pre-stressed concrete (PSC) box-girder bridge is also given in order to aid the understanding of the presented procedure. Copyright © 2013 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carter, E.E.; Welty, B.D.
Molten wax shows considerable promise as a fixative and dust control agent in demolition of radioactively contaminated facilities. Sticky molten wax, modified with special surfactants and wetting agents, is capable of not only coating materials but also penetrating into friable or dusty materials and making them incapable of becoming airborne during demolition. Wax also shows significant promise for stabilization of waste residuals that may be contained in buildings undergoing demolition. Some of the building materials that have been tested to date include concrete, wood, sheet rock, fiber insulation, lime, rock, and paper. Protective clothing, clay, sand, sulfur, and bentonite claymore » have been tested as surrogates for certain waste materials that may be encountered during building demolition. The paper describes several potential applications of molten wax for dust control in demolition of radioactive contaminated facilities. As a case-study, this paper describes a research test performed for a pipeline closure project being completed by the Idaho Cleanup Project at the Idaho National Laboratory. The project plans to excavate and remove a section of buried Duriron drain piping containing highly radioactive and friable and 'flighty' waste residuals. A full-scale pipeline mockup containing simulated waste was buried in sand to simulate the direct buried subsurface condition of the subject piping. The pipeline was pre-heated by drawing hot air through the line with a HEPA vacuum blower unit. Molten wax was pumped into the line and allowed to cool. The line was then broken apart in various places to evaluate the permeation performance of the wax. The wax fully permeated all the surrogate materials rendering them non-friable with a consistency similar to modeling clay. Based on the performance during the mockup, it is anticipated that the wax will be highly effective in controlling the spread of radiological contamination during pipe demolition activities. (authors)« less
Recovery Act Weekly Video: Upper ALE Building Demolition
None
2017-12-11
CH2MHILL Plateau Remediation Company demolition of 6652C Space Science Laboratory. The largest building atop Rattlesnake Mountain, the laboratory served as a nightly radar patrol center as well as a barracks. The Recovery Act funded project is helping reduce the site footprint.
OPEN AIR DEMOLITION OF FACILITIES HIGHLY CONTAMINATED WITH PLUTONIUM
DOE Office of Scientific and Technical Information (OSTI.GOV)
LLOYD, E.R.
2007-05-31
The demolition of highly contaminated plutonium buildings usually is a long and expensive process that involves decontaminating the building to near free- release standards and then using conventional methods to remove the structure. It doesn't, however, have to be that way. Fluor has torn down buildings highly contaminated with plutonium without excessive decontamination. By removing the select source term and fixing the remaining contamination on the walls, ceilings, floors, and equipment surfaces; open-air demolition is not only feasible, but it can be done cheaper, better (safer), and faster. Open-air demolition techniques were used to demolish two highly contaminated buildings tomore » slab-on-grade. These facilities on the Department of Energy's Hanford Site were located in, or very near, compounds of operating nuclear facilities that housed hundreds of people working on a daily basis. To keep the facilities operating and the personnel safe, the projects had to be creative in demolishing the structures. Several key techniques were used to control contamination and keep it within the confines of the demolition area: spraying fixatives before demolition; applying fixative and misting with a fine spray of water as the buildings were being taken down; and demolishing the buildings in a controlled and methodical manner. In addition, detailed air-dispersion modeling was done to establish necessary building and meteorological conditions and to confirm the adequacy of the proposed methods. Both demolition projects were accomplished without any spread of contamination outside the modest buffer areas established for contamination control. Furthermore, personnel exposure to radiological and physical hazards was significantly reduced by using heavy equipment rather than ''hands on'' techniques.« less
A major product recovered from the processing and recycling of construction and demolition (C&D) debris is screened soil, also referred to as fines. A proposed reuse option for C&D debris fines is fill material, typically in construction projects as a substitute for natural soil....
A BIM-based system for demolition and renovation waste estimation and planning.
Cheng, Jack C P; Ma, Lauren Y H
2013-06-01
Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C&D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D&R) works and the growing amount of D&R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D&R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D&R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control. Copyright © 2013 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carter, E.E.
Molten wax shows considerable promise as a fixative and dust control agent in demolition of radioactively contaminated facilities. Sticky molten wax, modified with special surfactants and wetting agents, is capable of not only coating materials but also penetrating into friable or dusty materials and making them incapable of becoming airborne during demolition. Wax also shows significant promise for stabilization of waste residuals that may be contained in buildings undergoing demolition. Some of the building materials that have been tested to date include concrete, wood, sheet-rock, fiber insulation, lime, rock, and paper. Protective clothing, clay, sand, sulfur, and bentonite clay havemore » been tested as surrogates for certain waste materials that may be encountered during building demolition. The paper describes several potential applications of molten wax for dust control in demolition of radioactive contaminated facilities. As a case-study, this paper describes a research test performed for a pipeline closure project being completed by the Idaho Cleanup Project at the Idaho National Laboratory. The project plans to excavate and remove a section of buried Duriron drain piping containing highly radioactive and friable and 'flighty' waste residuals. A full-scale pipeline mockup containing simulated waste was buried in sand to simulate the direct-buried subsurface condition of the subject piping. The pipeline was pre-heated by drawing hot air through the line with a HEPA vacuum blower unit. Molten wax was pumped into the line and allowed to cool. The line was then broken apart in various places to evaluate the permeation performance of the wax. The wax fully permeated all the surrogate materials rendering them non-friable with a consistency similar to modeling clay. Based on the performance during the mockup, it is anticipated that the wax will be highly effective in controlling the spread of radiological contamination during pipe demolition activities. A larger test was completed this year to simulate the work in more realistic conditions. (authors)« less
Code of Federal Regulations, 2013 CFR
2013-07-01
... a Regulated Navigation Area (RNA): All navigable waters of Penobscot River between Prospect, ME and...) Regulations. (1) The general regulations contained in 33 CFR 165.10, 165.11, and 165.13 apply within the RNA... New England. (3) Persons and vessels may request permission to enter the RNA during periods of...
QA program plan plutonium stabilization and handling project W-460
DOE Office of Scientific and Technical Information (OSTI.GOV)
SCHULTZ, J.W.
This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.
Code of Federal Regulations, 2011 CFR
2011-07-01
... vessel shall adjust its speed so as to avoid a meeting situation in the RNA. (ii) If the RNA is... its speed so as to avoid a meeting situation in the RNA. (ii) If the RNA is temporarily closed to... regulated navigation area (RNA): All waters of the Lower Mississippi River beginning at mile 528 and ending...
Code of Federal Regulations, 2012 CFR
2012-07-01
... vessel shall adjust its speed so as to avoid a meeting situation in the RNA. (ii) If the RNA is... its speed so as to avoid a meeting situation in the RNA. (ii) If the RNA is temporarily closed to... regulated navigation area (RNA): All waters of the Lower Mississippi River beginning at mile 528 and ending...
Proposed Demolition of Hangars; Projects 11-0098-11-0102 Environmental Assessment
2012-03-22
decrease its space and energy use • Be compliant with current land use zoning ( Industrial ) • Not violate any provisions of the National Historic... industrial usage of the hangars, contamination of shallow soil is known to exist beneath or adjacent to the structures undergoing demolition and...buildings occur in an industrial part of the base which has already been heavily disturbed due to past construction activities. The buildings proposed for
Environmental Assessment Proposed Demolition Plan Hill Air Force Base, Utah
2010-04-01
1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law , no person shall be subject to a penalty...Demolition Plan Hill Air Force Base, Utah 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK...NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) United States Air Force - Air Force Material Command,Hill Air Force
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cheng, Jack C.P., E-mail: cejcheng@ust.hk; Ma, Lauren Y.H., E-mail: yingzi@ust.hk
Highlights: ► We developed a waste estimation system leveraging the BIM technology. ► The system can calculate waste disposal charging fee and pick-up truck demand. ► We presented an example scenario demonstrating this system. ► Automatic, time-saving and wide applicability are the features of the system. - Abstract: Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C and D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D and R) works and the growing amount of D and R wastemore » disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D and R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D and R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control.« less
1990-11-01
cutoff trench be fractured and removed using a non-explosive demolition agent on a IV on 1H slope. No. 40 Required the additional rock excavation of the...Sniabar limestone in Modification 33 be extended downstream through the cutoff trench using the same non-explosive demolition agent . No. 41 Changed the...O45,913 i!~~C ~ &E~J----------- - -- - r - - - - --- USARMY ENGINEER DISTRICT COPPS OF ENGINEERS KIANSAS CITfY MISSOURI 1 LITTLE BLOE RIVERMISSOJRI R G~ 0
Code of Federal Regulations, 2010 CFR
2010-07-01
... GUIDELINES AND UNIFORM STANDARDS FOR URBAN PLANNING AND DESIGN OF DEVELOPMENT WITHIN THE PENNSYLVANIA AVENUE..., planned unit development, or project resulting from the process of planning, land acquisition, demolition...
Code of Federal Regulations, 2011 CFR
2011-07-01
... GUIDELINES AND UNIFORM STANDARDS FOR URBAN PLANNING AND DESIGN OF DEVELOPMENT WITHIN THE PENNSYLVANIA AVENUE..., planned unit development, or project resulting from the process of planning, land acquisition, demolition...
100-KE REACTOR CORE REMOVAL PROJECT ALTERNATIVE ANALYSIS WORKSHOP REPORT
DOE Office of Scientific and Technical Information (OSTI.GOV)
HARRINGTON RA
2010-01-15
On December 15-16, 2009, a 100-KE Reactor Core Removal Project Alternative Analysis Workshop was conducted at the Washington State University Consolidated Information Center, Room 214. Colburn Kennedy, Project Director, CH2M HILL Plateau Remediation Company (CHPRC) requested the workshop and Richard Harrington provided facilitation. The purpose of the session was to select the preferred Bio Shield Alternative, for integration with the Thermal Shield and Core Removal and develop the path forward to proceed with project delivery. Prior to this workshop, the S.A. Robotics (SAR) Obstruction Removal Alternatives Analysis (565-DLV-062) report was issued, for use prior to and throughout the session, tomore » all the team members. The multidisciplinary team consisted ofrepresentatives from 100-KE Project Management, Engineering, Radcon, Nuclear Safety, Fire Protection, Crane/Rigging, SAR Project Engineering, the Department of Energy Richland Field Office, Environmental Protection Agency, Washington State Department of Ecology, Defense Nuclear Facility Safety Board, and Deactivation and Decommission subject matter experts from corporate CH2M HILL and Lucas. Appendix D contains the workshop agenda, guidelines and expectations, opening remarks, and attendance roster going into followed throughout the workshop. The team was successful in selecting the preferred alternative and developing an eight-point path forward action plan to proceed with conceptual design. Conventional Demolition was selected as the preferred alternative over two other alternatives: Diamond Wire with Options, and Harmonic Delamination with Conventional Demolition. The teams preferred alternative aligned with the SAR Obstruction Removal Alternative Analysis report conclusion. However, the team identified several Path Forward actions, in Appendix A, which upon completion will solidify and potentially enhance the Conventional Demolition alternative with multiple options and approaches to achieve project delivery. In brief, the Path Forward was developed to reconsider potential open air demolition areas; characterize to determine if any zircaloy exists, evaluate existing concrete data to determine additional characterization needs, size the new building to accommodate human machine interface and tooling, consider bucket thumb and use ofshape-charges in design, and finally to utilize complex-wide and industry explosive demolition lessons learned in the design approach. Appendix B documents these results from the team's use ofValue Engineering process tools entitled Weighted Analysis Alternative Matrix, Matrix Conclusions, Evaluation Criteria, and Alternative Advantages and Disadvantages. These results were further supported with the team's validation of parking-lot information sheets: memories (potential ideas to consider), issues/concerns, and assumptions, contained in Appendix C. Appendix C also includes the recorded workshop flipchart notes taken from the SAR Alternatives and Project Overview presentations. The SAR workshop presentations, including a 3-D graphic illustration demonstration video have been retained in the CHPRC project file, and were not included in this report due to size limitations. The workshop concluded with a round robin close-out where each member was engaged for any last minute items and meeting utility. In summary, the team felt the session was value added and looked forward to proceeding with the recommended actions and conceptual design.« less
Damage Assessment Map from Interferometric Coherence
NASA Astrophysics Data System (ADS)
Yun, S.; Fielding, E. J.; Simons, M.; Rosen, P. A.; Owen, S. E.; Webb, F.
2010-12-01
Large earthquakes cause buildings to collapse, which often claims the lives of many. For example, 2010 Haiti earthquake killed about 230,000 people, with about 280,000 buildings collapsed or severely damaged. When a major earthquake hits an urban area, one of the most critical information for rescue operations is rapid and accurate assessment of building-collapse areas. From a study on 2003 Bam earthquake in Iran, interferometric coherence was proved useful for earthquake damage assessment (Fielding et al., 2005) when similar perpendicular baselines can be found for pre- and coseismic interferometric pairs and when there is little temporal and volume decorrelation. In this study we develop a new algorithm to create a more robust and accurate damage assessment map using interferometric coherence despite different interferometric baselines and with other decorrelation sources. We test the algorithm on a building block that recently underwent demolition, which is a proxy for building collapse due to earthquakes, for new construction in the City of Pasadena, California. The size of the building block is about 150 m E-W and 300 m N-S, and the demolition project started on April 23, 2007 and continued until January 22, 2008. After we process Japanese L-band ALOS PALSAR data with ROI_PAC, an interferometric coherence map that spans the demolition period is registered to a coherence map before the demolition, and the relative bias of the coherence values are removed, then a causality constraint is applied to enhance the change due to demolition. The results show clear change in coherence at the demolition site. We improve the signal-to-noise ratio of the coherence change at the demolition site from 17.3 (for simple difference) to 44.6 (with the new algorithm). The damage assessment map algorithm will become more useful with the emergence of InSAR missions with more frequent data acquisition, such as Sentinel-1 and DESDynI.
Progress in Decommissioning the Humboldt Bay Power Plant - 13604
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rod, Kerry; Shelanskey, Steven K.; Kristofzski, John
Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) tomore » Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)« less
Goetz, Edward
2011-01-01
The gentrification that has transformed high-poverty neighbourhoods in US cities since the mid 1990s has been characterised by high levels of state reinvestment. Prominent among public-sector interventions has been the demolition of public housing and in some cases multimillion dollar redevelopment efforts. In this paper, the racial dimension of state-supported gentrification in large US cities is examined by looking at the direct and indirect displacement induced by public housing transformation. The data show a clear tendency towards the demolition of public housing projects with disproportionately high African American occupancy. The pattern of indirect displacement is more varied; public housing transformation has produced a number of paths of neighbourhood change. The most common, however, involve significant reductions in poverty, sometimes associated with Black to White racial turnover and sometimes not. The findings underscore the central importance of race in understanding the dynamics of gentrification in US cities.
24 CFR 290.27 - Up-front grants and loans.
Code of Federal Regulations, 2011 CFR
2011-04-01
... may provide up-front grants and loans for rehabilitation, demolition, rebuilding and other related... determination that such a grant or loan, plus any additional project-based assistance made available, would be more cost-effective than the use of the maximum permissible project-based rental assistance alone. (b...
24 CFR 970.15 - Specific criteria for HUD approval of demolition requests.
Code of Federal Regulations, 2011 CFR
2011-04-01
... modifications is cost-effective to return the public housing project or portion of the project to useful life...: Structural deficiencies that cannot be corrected in a cost-effective manner (settlement of earth below the... of the neighborhood; change from residential to industrial or commercial development; or...
Comparison of different building shells - life cycle assessment.
Rixrath, Doris; Wartha, Christian
2016-07-01
The Renewable Energy and Efficiency Action (REACT) project is a European Union-funded cross-border cooperative venture featuring the participation of companies and researchers from the Austrian state of Burgenland and western Slovakia that is developing zero-energy concepts for newly built single-family homes. A variety of building structures are defined for family houses, and the different impacts they have on the environment are evaluated over the entire life cycle. This paper aims to compare the environmental impacts of different building shells during both the construction and the demolition phases. However, the operation phase of the building is not evaluated. One of the findings of the project thus far is that the demolition and disposal of building materials should be included in any such evaluation. For some environmental impact assessment categories, both demolition and disposal are important. The environmental impacts of various end-of-life scenarios can differ greatly based on the disposal method (e.g., landfill, incineration, recycling) chosen and on the proportion of recycled content. Furthermore, the results show that manufacturing building materials from renewable resources can have strong environmental impacts, particularly when substantial amounts of fossil fuel are required in their production. Integr Environ Assess Manag 2016;12:437-444. © 2016 SETAC. © 2016 SETAC.
Application of Updated Construction and Demolition Waste Reduction Policy to Army Projects
2015-12-01
goal of Net Zero waste disposal in landfills. Therefore, projects that involve the removal of existing buildings or structures are directed to...Therefore, projects that involve the removal of existing buildings or structures will evaluate the feasibility of deconstruction and salvage rather than...deconstruction. Therefore, needed new guidance must include consideration of the types of buildings and structures that do (and do not) lend
24 CFR 970.27 - De minimis exception to demolition requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false De minimis exception to demolition... De minimis exception to demolition requirements. (a) A PHA may demolish units without submitting an... proposed de minimis demolition, except that any demolition performed prior to October 21, 1998, will not be...
24 CFR 970.27 - De minimis exception to demolition requirements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false De minimis exception to demolition... De minimis exception to demolition requirements. (a) A PHA may demolish units without submitting an... proposed de minimis demolition, except that any demolition performed prior to October 21, 1998, will not be...
Environmental Assessment for Kirtland Air Force Base 2002 Construction and Demolition Projects
2003-01-01
Siberian elm (Ulmus pumila), Mormon tea ( Ephedra trifurca), New Mexican bitterweed (Senecio neomexicanus), ring muhly (Muhlenbergia torreyi), plains...earless lizard (Holbrookia maculata), and the western rattlesnake (Crotalus viridis ). Many of these species have extensive periods of dormancy
A Spanish model for quantification and management of construction waste.
Solís-Guzmán, Jaime; Marrero, Madelyn; Montes-Delgado, Maria Victoria; Ramírez-de-Arellano, Antonio
2009-09-01
Currently, construction and demolition waste (C&D waste) is a worldwide issue that concerns not only governments but also the building actors involved in construction activity. In Spain, a new national decree has been regulating the production and management of C&D waste since February 2008. The present work describes the waste management model that has inspired this decree: the Alcores model implemented with good results in Los Alcores Community (Seville, Spain). A detailed model is also provided to estimate the volume of waste that is expected to be generated on the building site. The quantification of C&D waste volume, from the project stage, is essential for the building actors to properly plan and control its disposal. This quantification model has been developed by studying 100 dwelling projects, especially their bill of quantities, and defining three coefficients to estimate the demolished volume (CT), the wreckage volume (CR) and the packaging volume (CE). Finally, two case studies are included to illustrate the usefulness of the model to estimate C&D waste volume in both new construction and demolition projects.
Bouza, E; Peláez, T; Pérez-Molina, J; Marín, M; Alcalá, L; Padilla, B; Muñoz, P; Adán, P; Bové, B; Bueno, M J; Grande, F; Puente, D; Rodríguez, M P; Rodríguez-Créixems, M; Vigil, D; Cuevas, O
2002-12-01
The demolition of a maternity building at our institution provided us with the opportunity to study the load of filamentous fungi in the air. External (nearby streets) and internal (within the hospital buildings) air was sampled with an automatic volumetric machine (MAS-100 Air Samplair) at least daily during the week before the demolition, at 10, 30, 60, 90,120, 180, 240, 420, 540 and 660 min post-demolition, daily during the week after the demolition and weekly during weeks 2, 3 and 4 after demolition. Samples were duplicated to analyse reproducibility. Three hundred and forty samples were obtained: 115 external air, 69 'non-protected' internal air and 156 protected internal air [high efficiency particulate air (HEPA) filtered air under positive pressure]. A significant increase in the colony count of filamentous fungi occurred after the demolition. Median colony counts of external air on demolition day were significantly higher than from internal air (70.2 cfu/m(3) vs 35.8 cfu/m(3)) (P < 0.001). Mechanical demolition on day +4 also produced a significant difference between external and internal air (74.5 cfu/m(3) vs 41.7 cfu/m(3)). The counts returned to baseline levels on day +11. Most areas with a protected air supply yielded no colonies before demolition day and remained negative on demolition day. The reproducibility of the count method was good (intra-assay variance: 2.4 cfu/m(3)). No episodes of invasive filamentous mycosis were detected during the three months following the demolition. Demolition work was associated with a significant increase in the fungal colony counts of hospital external and non-protected internal air. Effective protective measures may be taken to avoid the emergence of clinical infections. Copyright 2002 The Hospital Infection Society
Recycling of rubble from building demolition for low-shrinkage concretes.
Corinaldesi, Valeria; Moriconi, Giacomo
2010-04-01
In this project concrete mixtures were prepared that were characterized by low ductility due to desiccation by using debris from building demolition, which after a suitable treatment was used as aggregate for partial replacement of natural aggregates. The recycled aggregate used came from a recycling plant, in which rubble from building demolition was selected, crushed, cleaned, sieved, and graded. Such aggregates are known to be more porous as indicated by the Saturated Surface Dry (SSD) moisture content. The recycled concrete used as aggregates were added to the concrete mixture in order to study their influence on the fresh and hardened concrete properties. They were added either after water pre-soaking or in dry condition, in order to evaluate the influence of moisture in aggregates on the performance of concrete containing recycled aggregate. In particular, the effect of internal curing, due to the use of such aggregates, was studied. Concrete behavior due to desiccation under dehydration was studied by means of both drying shrinkage test and German angle test, through which shrinkage under the restrained condition of early age concrete can be evaluated. Copyright 2009 Elsevier Ltd. All rights reserved.
Estimation of construction and demolition waste using waste generation rates in Chennai, India.
Ram, V G; Kalidindi, Satyanarayana N
2017-06-01
A large amount of construction and demolition waste is being generated owing to rapid urbanisation in Indian cities. A reliable estimate of construction and demolition waste generation is essential to create awareness about this stream of solid waste among the government bodies in India. However, the required data to estimate construction and demolition waste generation in India are unavailable or not explicitly documented. This study proposed an approach to estimate construction and demolition waste generation using waste generation rates and demonstrated it by estimating construction and demolition waste generation in Chennai city. The demolition waste generation rates of primary materials were determined through regression analysis using waste generation data from 45 case studies. Materials, such as wood, electrical wires, doors, windows and reinforcement steel, were found to be salvaged and sold on the secondary market. Concrete and masonry debris were dumped in either landfills or unauthorised places. The total quantity of construction and demolition debris generated in Chennai city in 2013 was estimated to be 1.14 million tonnes. The proportion of masonry debris was found to be 76% of the total quantity of demolition debris. Construction and demolition debris forms about 36% of the total solid waste generated in Chennai city. A gross underestimation of construction and demolition waste generation in some earlier studies in India has also been shown. The methodology proposed could be utilised by government bodies, policymakers and researchers to generate reliable estimates of construction and demolition waste in other developing countries facing similar challenges of limited data availability.
2003-09-01
Pollution Prevention Requirements; E.O. 12873 Federal Acquisition, Recycling , and Waste Prevention; E.O. 12902 Energy Efficiency and Water Conservation... recycled or recovered. The management of solid (non-hazardous) waste on Fairchild AFB includes the collection and disposal of solid wastes and... recyclable material. Demolition and inert wastes generated on Environmental Assessment Anti-Terrorism/Force Protection Gate Projects at Fairchild AFB
29 CFR 1926.859 - Mechanical demolition.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 8 2010-07-01 2010-07-01 false Mechanical demolition. 1926.859 Section 1926.859 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Demolition § 1926.859 Mechanical demolition. (a...
100 Area D4 Project Building Completion Report - July 2007 to December 2008
DOE Office of Scientific and Technical Information (OSTI.GOV)
M. T. Stankovich
2009-04-15
This report documents the decontamination, decommissioning, and demolition of the 105-NB, 163-N, 183-N, 183-NA, 183-NB, 183-NC, 184-N, 184-NA, 184-NB, 184-NC, 184-ND, 184-NE, 184-NF, 1312-N, 1330-N, 1705-N, 1705-NA, 1706-N, 1712-N, 1714-N, 1714-NA, 1714-NB, 1802-N, MO-050, MO-055, MO-358, MO-390, MO-900, MO-911, and MO-950 facilities in the 100 Area of the Hanford Site. The D4 activities for these facilities include utility disconnection, planning, characterization, engineering, removal of hazardous and radiological contaminated materials, equipment removal, decommissioning, deactivation, decontamination, demolition of the structure, and removal of the remaining slabs.
The demolition process impacts how vacant land might be reused for storm water management. For five residential demolition sites (Cleveland, Ohio), an enhanced green demolition process was observed in 2012, and soil physical and hydrologic characteristics were measured predemolit...
2014-11-10
NASA’s Operation IceBridge collected some rare images on a flight out of Punta Arenas, Chile on Nov. 5, 2014, on a science flight over western Antarctica dubbed Ferrigno-Alison-Abbott 01. Following a routine calibration pass over Punta Arenas airport, the NASA DC-8 overflew the USS Constellation which is being towed for demolition after 53 yeas of service. The crew then snapped a few shots of a calving front of the Antarctic ice sheet. This particular flight plan was designed to collect data on changes in ice elevation along the coast near the Ferrigno and Alison ice streams, on the Abbot Ice Shelf, and grounded ice along the Eights Coast.
76 FR 35006 - Recovery Policy RP9523.4, Demolition of Private Structures
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-15
...] Recovery Policy RP9523.4, Demolition of Private Structures AGENCY: Federal Emergency Management Agency, DHS... (FEMA) is accepting comments on Recovery Policy RP9523.4, Demolition of Private Structures. DATES... guidance in determining the eligibility of demolition of private structures under the provisions of the...
Application of Crushed Concrete in Geotechnical Engineering - Selected Issues
NASA Astrophysics Data System (ADS)
Kawalec, Jacek; Kwiecien, Slawomir; Pilipenko, Anton; Rybak, Jarosław
2017-12-01
The reuse of building materials becomes an important issue in sustainable engineering. As the technical requirements for civil engineering structures changes with time and the life time is limited, the need of building new objects meets the necessity of recycling of the existing ones. In the case of steel structures, the possibility of recycling is obvious, also in the case of wooden constructions, the possibility of “burning” solves the problem. The concrete waste is generated mainly as a result of the demolition and reconstruction of residential and industrial buildings. These types of waste are basically made from crushed rocks and cement minerals and contain non-hydrated cement particles in its composition. Concrete poses a lot of problems mainly for two reasons. It is difficult to crush, heavy and hard to transport and demanding in reuse. Different fractions (particle sizes) may be used for different purposes. Starting from very fine particles which can be used in concrete production, through regular 16-300 mm fractions used to form new fills and fill the mats, up to very irregular mixtures used to form stone columns by means of Impulse Compaction or in Dynamic Replacement. The presented study juxtaposes authors experience with crushed concrete used in civil engineering, mainly in geotechnical projects. Authors’ experiences comprise the application of crushed concrete in the new concrete production in Russia, changing pulverized bridge into the fill of mesh sacks, or mattresses used as an effective way to protect the shoreline and the New Orleans East land bridge after Katrina storm (forming a new shoreline better able to withstand wave actions), and finally the use of very irregular concrete fractions to form stone columns in week soils on the example of railway and road projects in Poland. Selected case studies are presented and summarized with regard to social, technical and economic issues including energy consumption needed for proposed technologies and dynamic impact of ground transmitted vibrations and noise.
Cha, Gi-Wook; Kim, Young-Chan; Moon, Hyeun Jun; Hong, Won-Hwa
2017-01-01
The roles of both the data collection method (including proper classification) and the behavior of workers on the generation of demolition waste (DW) are important. By analyzing the effect of the data collection method used to estimate DW, and by investigating how workers’ behavior can affect the total amount of DW generated during an actual demolition process, it was possible to identify strategies that could improve the prediction of DW. Therefore, this study surveyed demolition waste generation rates (DWGRs) for different types of building by conducting on-site surveys immediately before demolition in order to collect adequate and reliable data. In addition, the effects of DW management strategies and of monitoring the behavior of workers on the actual generation of DW were analyzed. The results showed that when monitoring was implemented, the estimates of DW obtained from the DWGRs that were surveyed immediately before demolition and the actual quantities of DW reported by the demolition contractors had an error rate of 0.63% when the results were compared. Therefore, this study has shown that the proper data collection method (i.e., data were collected immediately before demolition) applied in this paper and monitoring on the demolition site have a significant impact on waste generation. PMID:29023378
Pharmaceuticals and Controlled Substances and Demolition
Pharmaceuticals and controlled substances found during residential demolition, such as prescription medications or illegal drugs, may require special treatment for disposal or recycling before demolition.
26 CFR 1.280B-1 - Demolition of structures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 26 Internal Revenue 3 2010-04-01 2010-04-01 false Demolition of structures. 1.280B-1 Section 1... (CONTINUED) INCOME TAXES Items Not Deductible § 1.280B-1 Demolition of structures. (a) In general. Section 280B provides that, in the case of the demolition of any structure, no deduction otherwise allowable...
Detection of rebar delamination using modal analysis
NASA Astrophysics Data System (ADS)
Blodgett, David W.
2003-08-01
A non-destructive method for early detection of reinforcement steel bars (re-bar) delamination in concrete structures has been developed. This method, termed modal analysis, has been shown effective in both laboratory and field experiments. In modal analysis, an audio speaker is used to generate flexural resonant modes in the re-bar in reinforced concrete structures. Vibrations associated with these modes are coupled to the surrounding concrete and propagate to the surface where they are detected using a laser vibrometer and/or accelerometer. Monitoring both the frequency and amplitude of these vibrations provides information on the bonding state of the embedded re-bar. Laboratory measurements were performed on several specially prepared concrete blocks with re-bar of varying degrees of simulated corrosion. Field measurements were performed on an old bridge about to be torn down in Howard County, Maryland and the results compared with those obtained using destructive analysis of the bridge after demolition. Both laboratory and field test results show this technique to be sensitive to re-bar delamination.
Lindberg, Ann-Sofie; Oksa, Juha; Antti, Henrik; Malm, Christer
2015-01-01
Physical capacity has previously been deemed important for firefighters physical work capacity, and aerobic fitness, muscular strength, and muscular endurance are the most frequently investigated parameters of importance. Traditionally, bivariate and multivariate linear regression statistics have been used to study relationships between physical capacities and work capacities among firefighters. An alternative way to handle datasets consisting of numerous correlated variables is to use multivariate projection analyses, such as Orthogonal Projection to Latent Structures. The first aim of the present study was to evaluate the prediction and predictive power of field and laboratory tests, respectively, on firefighters' physical work capacity on selected work tasks. Also, to study if valid predictions could be achieved without anthropometric data. The second aim was to externally validate selected models. The third aim was to validate selected models on firefighters' and on civilians'. A total of 38 (26 men and 12 women) + 90 (38 men and 52 women) subjects were included in the models and the external validation, respectively. The best prediction (R2) and predictive power (Q2) of Stairs, Pulling, Demolition, Terrain, and Rescue work capacities included field tests (R2 = 0.73 to 0.84, Q2 = 0.68 to 0.82). The best external validation was for Stairs work capacity (R2 = 0.80) and worst for Demolition work capacity (R2 = 0.40). In conclusion, field and laboratory tests could equally well predict physical work capacities for firefighting work tasks, and models excluding anthropometric data were valid. The predictive power was satisfactory for all included work tasks except Demolition.
Progressively safer, cheaper demolition of Fernald
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robert Nichols; Norman Pennington
2000-09-29
Fluor Fernald, Inc. has been progressively improving Decontamination and Dismantlement (D&D) at the Department of Energy's Fernald Environmental Management Project by applying new technologies and better methodologies to the work. Demolition issues existed in the past that necessitated new or improved solutions to maintain worker safety, protect the environment and accomplish the work in a cost effective manner. Lessons learned from D&D of 80 structures has led to a systematic approach, which can be implemented in various D&D arenas. When facility production was halted, hold-up material and process residues remained in the process piping and components. Over 500,000 pounds ofmore » material was removed by workers who completed the tasks two years ahead of schedule, $7 million under budget and with an excellent safety record. This success was the result of detailed planning and irdision of lessons learned as work progressed from facility to facility. Work sequences were developed that reduced airborne contamination. Demolition of structures has been performed at Fernald by carefully selected and qualified subcontractors. Asbestos and lead abatement, equipment, piping and conduit removal, and structural demolition have been completed to progressively higher performance specifications developed by Fluor Fernald based on lessons learned during execution. Safety continues to be the primary consideration in performing potentially hazardous work. Technologies such as hydraulic shears have been developed and used to keep workers away from danger. A new technology, ''Cool Suits,'' has been demonstrated to help prevent heat stress when anti-contamination clothing is required in elevated temperature working conditions. For tall structures, implosion technologies have been employed with progressively improved results, Several other new technologies have been evaluated by Fluor Fernald and applied by subcontractors. The improved technologies included the oxy-gas torch, which uses gasoline instead of acetylene gas, and a vacuum system for asbestos removal of wall insulation. These new methods proved effective and beneficial. Fluor Fernald has integrated demolition activities with waste disposal requirements to enhance overall efficiency. The relatively straight steel configurations required for recycling, and waste acceptance criteria that dictate waste sizes are typically included in the subcontract specifications The progressive improvements by Fluor Fernald have led to cost savings and schedule acceleration without increased risk to workers or the environment. When Fluor Fernald came to the site in 1992, the remediation baseline reflected a completion schedule of 2020 and a cost of $7.2 billion. The current projection is 2008 and $4.2 billion.« less
Reuse and Recycling Opportunities and Demolition
Learn which about deconstruction, and which materials are good candidates for reuse and recycling during the pre-demolition planning. Learn more about how to make the site sustainable after demolition.
Lead-Based Paint and Demolition
The Lead Renovation, Repair, and Painting Rule does not apply to total demolition of a structure. Learn about EPA recommended lead-safe practices during total demolition activities to prevent and minimize exposure to lead.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
..., air compressor, electric screw guns, jackhammer, concrete saw, and chop saws) to be utilized on the... would be from a 980 Case backhoe, dump truck, air compressor, electric screw guns, jackhammer, concrete... behavioral effects related to project acoustic impacts, in the event of California sea lion and northern...
Sustainable Management of Construction and Demolition Materials
This web page discusses how to sustainably manage construction and demolition materials, Information covers, what they are, and how builders, construction crews, demolition teams,and deign practitioners can divert C&D from landfills.
PBF (PER620) interior of Reactor Room. Camera facing south from ...
PBF (PER-620) interior of Reactor Room. Camera facing south from stairway platform in southwest corner (similar to platform in view at left). Reactor was beneath water in circular tank. Fuel was stored in the canal north of it. Platform and apparatus at right is reactor bridge with control rod mechanisms and actuators. The entire apparatus swung over the reactor and pool during operations. Personnel in view are involved with decontamination and preparation of facility for demolition. Note rails near ceiling for crane; motor for rollup door at upper center of view. Date: March 2004. INEEL negative no. HD-41-3-2 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jones, A.; Hambro, L.; Hooper, K.
2008-07-01
This paper will present the history of the Atlas 36 and Titan 40 Space Launch Complexes (SLC), the facility assessment process, demolition planning, recycle methodology, and actual facility demolition that resulted in a 40% reduction in baseline cost. These two SLC launched hundreds of payloads into space from Cape Canaveral Air Force Station (AFS), Florida. The Atlas-Centaur family of rockets could lift small- to medium-size satellites designed for communications, weather, or military use, placing them with near pinpoint accuracy into their intended orbits. The larger Titan family was relied upon for heavier lifting needs, including launching military satellites as wellmore » as interplanetary probes. But despite their efficiency and cost-effectiveness, the Titan rockets, as well as earlier generation Atlas models, were retired in 2005. Concerns about potential environmental health hazards from PCBs and lead-based paint chipping off the facilities also contributed to the Air Force's decision in 2005 to dismantle and demolish the Atlas and Titan missile-launching systems. Lockheed Martin secured the complex following the final launch, removed equipment and turned over the site to the Air Force for decommissioning and demolition (D and D). AMEC was retained by the Air Force to perform demolition planning and facility D and D in 2004. AMEC began with a review of historical information, interviews with past operations personnel, and 100% facility assessment of over 100 structures. There where numerous support buildings that due to their age contained asbestos containing material (ACM), PCB-impacted material, and universal material that had to be identified and removed prior to demolition. Environmental testing had revealed that the 36B mobile support tower (MST) exceeded the TSCA standard for polychlorinated biphenyls (PCB) paint (<50 ppm), as did the high bay sections of the Titan Vertical Integration Building (VIB). Thus, while most of the steel structures could be completely recycled, about one-third of 36B MST and the affected areas of the VIB were to be consigned to an on-site regulated waste landfill. In all, it is estimated that approximately 10,000,000 kg (11,000 tons) of PCB-coated steel will be land-filled and 23,000,000 kg (25,000 tons) will be recycled. The recycling of the steel and other materials made it possible to do additional demolition by using these funds. Therefore, finding ways to maximize the recycle value of materials became a key factor in the pre-demolition characterization and implementation strategy. This paper will present the following: - Critical elements in demolition planning working at an active launch facility; - Characterization and strategy to maximize steel recycle; - Waste disposition strategy to maximize recycle/reuse and minimize disposal; - Recycle options available at DOD installations that allow for addition funds for demolition; - Innovation in demolition methodologies for large structures - explosive demolition and large-scale dismantlement; - H and S aspects of explosive demolition and large scale dismantlement. In conclusion: The Cape Canaveral AFS Demolition Program has been a great success due to the integration of multiple operations and contractors working together to determine the most cost-effective demolition methods. It is estimated that by extensive pre-planning and working with CCAFS representatives, as well as maximizing the recycle credits of various material, primarily steel, that the government will be able to complete what was base-lined to be a $30 M demolition program for < $20 M. Other factors included a competitive subcontractor environment where they were encouraged with incentives to maximize recycle/reuse of material and creative demolition solutions. Also, by overlapping multiple demolition tasks at multiple facilities allowed for a reduction in field oversight. (authors)« less
Management of construction and demolition wastes as secondary building resources
NASA Astrophysics Data System (ADS)
Manukhina, Lyubov; Ivanova, Irina
2017-10-01
The article analyzes the methods of management of construction and demolition wastes. The authors developed suggestions for improving the management system of the turnover of construction and demolition wastes. Today the issue of improving the management of construction and demolition wastes is of the same importance as problems of protecting the life-support field from pollution and of preserving biological and land resources. The authors educed the prospective directions and methods for improving the management of the turnover processes for construction and demolition wastes, including the evaluation of potential of wastes as secondary raw materials and the formation of a centralized waste management system.
Centrifugal shot blasting. Innovative technology summary report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1999-07-01
At the US Department of Energy (DOE) Fernald Environmental Management Project (FEMP), the Facilities Closure and Demolition Projects Integrated Remedial Design/Remedial Action (RD/RA) work plan calls for the removal of one inch (1 in) depth of concrete surface in areas where contamination with technetium-99 has been identified. This report describes a comparative demonstration between two concrete removal technologies: an innovative system using Centrifugal Shot Blasting (CSB) and a modified baseline technology called a rotary drum planer.
A pre-demolition inspection may be one of the most helpful and cost-efficient steps you can take to identify materials that should (or must) be removed from buildings prior to demolition. In some cases it may be required by regulation.
ASBESTOS RELEASE DURING BUILDING DEMOLITION ACTIVITIES
The U.S. Environmental Protection Agency's (EPA) Risk Reduction Engineering Laboratory (RREL) monitored block-wide building demolition and debris disposal activities at Santa Cruz and Watsonsville, California following the 1989 earthquake; an implosion demolition of a 26-story bu...
Lead exposure in a tank demolition crew: implications for the new OSHA construction lead standard.
Waller, K; Osorio, A M; Jones, J
1994-11-01
The Federal Occupational Safety and Health Administration (OSHA) has recently extended the basic health and safety provisions of the OSHA lead standard for general industry to workers in the construction industry. In this report we describe a tank demolition worksite that midway through the project strengthened its lead exposure control activities to a level that approximated the current lead standard. Of 12 tested ironworkers and laborers who worked at the site before the change, zinc protoporphyrin levels increased and seven developed blood lead levels (BLL) > 50 micrograms/dL. After the change these workers' BLLs declined. Six workers hired after the change did not experience increases in zinc protoporphyrin and none developed BLL > 25 micrograms/dL. The experience at this worksite demonstrates the usefulness and feasibility of implementing the current lead standard in construction settings.
State and county delivered bridge replacement project analysis : phase I and phase II.
DOT National Transportation Integrated Search
2010-02-01
The purpose of the study was to compare the cost of state delivered bridge projects and county delivered bridge projects. A total of 190 different bridge replacement projects were analyzed. The first phase of the project focused on whether or not the...
DOT National Transportation Integrated Search
2010-02-01
The purpose of the study was to compare the cost of state delivered bridge projects and county delivered bridge projects. A total of 190 different bridge replacement projects were analyzed. The first phase of the project focused on whether or not the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chaloupka, Allan B.; Finn, Kevin P.; Parsons, Duane A.
2012-07-01
When the nation's top scientists and military leaders converged on Los Alamos, New Mexico in the 1943, to work on the Manhattan Project, the facilities they used to conduct their top-secret work were quickly constructed and located in the middle of what eventually became the Los Alamos town site. After one of these early facilities caught on fire, it seemed wise to build labs and production facilities farther away from the homes of the town's residents. They chose to build facilities on what was then known as Delta Prime (DP) Mesa and called it Technical Area 21, or TA-21. Withmore » wartime urgency, a number of buildings were built at TA-21, some in as little as a few months. Before long, DP Mesa was populated with several nondescript metal and cinder-block buildings, including what became, immediately following the war, the world's first plutonium production facility. TA-21 also housed labs that used hazardous chemicals and analyzed americium, tritium and plutonium. TA-21 was a bustling center of research and production for the next several decades. Additional buildings were built there in the 1960's, but by the 1990's many of them had reached the end of their service lives. Labs and offices were moved to newer, more modern buildings. When Los Alamos National Laboratory received $212 million in funding from the American Recovery and Reinvestment Act in July 2009 for environmental cleanup projects, about $73 million of the funds were earmarked to decontaminate and demolish 21 of the old buildings at TA-21. Although some D and D of TA-21 buildings was performed in the 1990's, many of the facilities at DP Site remained relatively untouched for nearly three decades following their final operational use. In 2006, there were over three dozen buildings or structures on the mesa to be removed so that soil cleanup could be completed (and the land made available for transfer and reuse). The total footprint of buildings across the mesa was approximately 18,580 m{sup 2} (200,000 ft{sup 2}). The initially approved baseline for the ARRA D and D Project was to remove 22 buildings and structures that included approximately 14,680 m{sup 2} (158,000 ft{sup 2}) of footprint. By employing efficiencies during subcontracting, demolition, and waste segregation, the savings allowed an additional 1,580 m{sup 2} (17,000 ft{sup 2}) of footprint to be removed using ARRA funds. Additionally, the lessons learned from this experience were used to apply NNSA funding to the removal of six additional non-contaminated buildings and structures. In the end, 29 buildings and structures, including stacks, cooling towers and tanks, were removed from the mesa. The entire DP East area was cleared of buildings and sub-grade structures and the soils cleaned to residential standards. The total footprint reduction at TA-21 as a result of this effort was in excess of 17,650 m{sup 2} (190,000 ft{sup 2}). The use of a Laboratory self-performance team to start demolition of non-contaminated structures resulted in steady work performance early in the project while subcontracts were being put in place to perform more complicated abatement and contaminated demolition activities. Most importantly, there were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals or radioactive contamination were released and radiological dose to the public was negligible. The ARRA demolition activities were completed six months in advance of the deadline for employing ARRA funds. Additionally, over 17,585 m{sup 3} (23,000 yds{sup 3}) of building demolition debris was safely removed from DP Mesa. All of the major buildings have been removed, unencumbered access to the SWMUs that are required to be cleaned up by the Consent Order with the state of New Mexico, has been achieved, and a significant portion of the mesa has been prepared to support a process that will eventually transfer this land from federal government control for further use. (authors)« less
Villoria Sáez, Paola; del Río Merino, Mercedes; Porras-Amores, César
2012-02-01
The management planning of construction and demolition (C&D) waste uses a single indicator which does not provide enough detailed information. Therefore the determination and implementation of other innovative and precise indicators should be determined. The aim of this research work is to improve existing C&D waste quantification tools in the construction of new residential buildings in Spain. For this purpose, several housing projects were studied to determine an estimation of C&D waste generated during their construction process. This paper determines the values of three indicators to estimate the generation of C&D waste in new residential buildings in Spain, itemizing types of waste and construction stages. The inclusion of two more accurate indicators, in addition to the global one commonly in use, provides a significant improvement in C&D waste quantification tools and management planning.
188. Photocopy of drawing (1975 demolition drawing by the Ralph ...
188. Photocopy of drawing (1975 demolition drawing by the Ralph M. Parsons Company) DEMOLITION AND REMOVAL PLANS FOR MST STATION 39, 48, 55.5, AD 63, SHEET D-6 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
22 CFR 121.11 - Military demolition blocks and blasting caps.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Military demolition blocks and blasting caps. 121.11 Section 121.11 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS THE UNITED STATES MUNITIONS LIST Enumeration of Articles § 121.11 Military demolition blocks and...
22 CFR 121.11 - Military demolition blocks and blasting caps.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Military demolition blocks and blasting caps. 121.11 Section 121.11 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS THE UNITED STATES MUNITIONS LIST Enumeration of Articles § 121.11 Military demolition blocks and...
22 CFR 121.11 - Military demolition blocks and blasting caps.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Military demolition blocks and blasting caps. 121.11 Section 121.11 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS THE UNITED STATES MUNITIONS LIST Enumeration of Articles § 121.11 Military demolition blocks and...
22 CFR 121.11 - Military demolition blocks and blasting caps.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Military demolition blocks and blasting caps. 121.11 Section 121.11 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS THE UNITED STATES MUNITIONS LIST Enumeration of Articles § 121.11 Military demolition blocks and...
Cost-Benefit Analysis on Countermeasures for Health Risk by Exposure to Asbestos in Japan
NASA Astrophysics Data System (ADS)
Fujinaga, Aiichiro; Hihara, Hidemi; Tatsuno, Makoto
This study examines asbestos mitigation countermeasures by predicting air concentrations of asbestos, and then cost-benefit analyses is performed. A comparative study was conducted on three cases as follows; case one, demolition by machine & landfill, case two, demolition by hand & landfill, and case three demolition by hand & vitrification treatment. The results showed that if demolition by machine is continued, the risk is greater than 10-4 of upper acceptable risk for 2020. However, if demolition is conducted by hand, the risk is under 10-4 for 2010. And also, the risk will be less than 10-5 of the safety level for environmental standards until 2030. The results show that vitrification deletes the risk on future management at a landfill site, however at a higher cost.
Barreiros, Gloria; Akiti, Tiyomi; Magalhães, Ana Cristina Gouveia; Nouér, Simone A; Nucci, Marcio
2015-12-01
Building renovations increase the concentration of Aspergillus conidia in the air. In 2010, one wing of the hospital building was imploded due to structural problems. To evaluate the impact of building implosion on the concentration of fungi in the air, the demolition was performed in two phases: mechanical demolition of 30 m of the building, followed by implosion of the wing. Patients at high risk for aspergillosis were placed in protected wards. Air sampling was performed during mechanical demolition, on the day of implosion and after implosion. Total and specific fungal concentrations were compared in the different areas and periods of sampling, using the anova test. The incidence of IA in the year before and after implosion was calculated. The mean concentration of Aspergillus increased during mechanical demolition and on the day of implosion. However, in the most protected areas, there was no significant difference in the concentration of fungi. The incidence of invasive aspergillosis (cases per 1000 admissions) was 0.9 in the 12 months before, 0.4 during, and 0.5 in the 12 months after mechanical demolition (P > 0.05). Continuous monitoring of the quality of air and effective infection control measures are important to minimize the impact of building demolition. © 2015 Blackwell Verlag GmbH.
Project #OPE-FY17-0010, Feb 6, 2017. The EPA OIG plans to begin field work to determine whether EPA Region 4 and the state of North Carolina followed appropriate procedures in addressing claims of an improper asbestos demolition.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Convenience of the Government (Dismantling, Demolition, or Removal of Improvements). 52.249-3 Section 52.249-3... Convenience of the Government (Dismantling, Demolition, or Removal of Improvements). As prescribed in 49.502(b)(2), insert the following clause: Termination for Convenience of the Government (Dismantling...
22 CFR 121.11 - Military demolition blocks and blasting caps.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Military demolition blocks and blasting caps... blasting caps. Military demolition blocks and blasting caps referred to in Category IV(a) do not include the following articles: (a) Electric squibs. (b) No. 6 and No. 8 blasting caps, including electric...
In 2013, the United States generated 530 million tons of construction and demolition debris (CDD), 90% of which was related to demolition. Despite this major contribution to national waste streams, Life Cycle Assessment (LCA) studies and product declarations of buildings and buil...
Preserving the Manhattan Project
NASA Astrophysics Data System (ADS)
Kelly, Cynthia
2014-03-01
When future generations look back on the 20th century, few events will rival the harnessing of nuclear energy as a turning point in world history, science and society. Yet, the Department of Energy has not always embraced its Manhattan Project origins. The presentation will focus on the progress made over the last 20 years to preserve the properties and first-hand accounts that for decades have been threatened with demolition and indifference. Since the mid-1950s, most remaining Manhattan Project properties at the Los Alamos National Laboratory had been abandoned. Among them was a cluster of wooden buildings called the ``V Site.'' This is where scientists assembled the ``Gadget,'' the world's first atomic device tested on July 16, 1945. Regardless of its significance, the ``V Site'' buildings like all the rest were slated for demolition. The Advisory Council on Historic Preservation (ACHP) toured the properties in November 1998. Most could not believe that the world's first atomic bomb was designed in such humble structures. The properties were declared to be ``monumental in their lack of monumentality.'' A Save America's Treasures grant for 700,000 was awarded to restore the properties. To raise the required matching funds, I left the Federal government and soon founded the Atomic Heritage Foundation. The presentation will trace the progress made over the last decade to generate interest and support nationwide to preserve the Manhattan Project heritage. Saving both the physical properties and first-hand accounts of the men and women have been a priority. Perhaps our most significant achievement may be legislation now under consideration by Congress to create a Manhattan Project National Historical Park. Seventy years later, the Manhattan Project is finally getting the recognition it deserves.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false How will a bridge project be programmed for funding once... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a bridge project be programmed for funding once eligibility has been determined? (a) All projects will be...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false How will a bridge project be programmed for funding once... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a bridge project be programmed for funding once eligibility has been determined? (a) All projects will be...
77 FR 38723 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-29
...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... effect throughout the duration of the construction and renewal of the Sellwood Bridge located on the... the construction area while transiting in the vicinity of the Sellwood Bridge project; however, the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-09
... of Marine Mammals Incidental to Specified Activities; Antioch Bridge Seismic Retrofit Project... pile driving associated with the Antioch Bridge Seismic Retrofit Project. DATES: Effective August 15... request from Caltrans to harass marine mammals incidental to the Antioch Bridge Seismic Retrofit Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-22
... of Marine Mammals Incidental to Specified Activities; Dumbarton Bridge Seismic Retrofit Project... pile driving associated with the Dumbarton Bridge Seismic Retrofit Project. DATES: Effective August 15... request from Caltrans to harass marine mammals incidental to the Dumbarton Bridge Seismic Retrofit Project...
77 FR 14970 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-14
...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... effect throughout the duration of the construction and renewal of the Sellwood Bridge on the Willamette... construction area while transiting in the vicinity of the Sellwood Bridge project; however, the establishment...
Final Environmental Assessment for Aircraft Maintenance Operations Center
2014-06-01
short-term emissions during construction of new facilities, demolition of existing buildings, and removal of existing asphalt /concrete. There would...Repair: The existing asphalt road accessing Building 1934 would be repaired in June 2014. It is anticipated that this project would qualify for a CatEx...removal of existing asphalt /concrete. Minimal ambient air impacts from localized short-term emissions that would quickly dissipate away from the
Leaching behaviour of hazardous demolition waste.
Roussat, Nicolas; Méhu, Jacques; Abdelghafour, Mohamed; Brula, Pascal
2008-11-01
Demolition wastes are generally disposed of in unlined landfills for inert waste. However, demolition wastes are not just inert wastes. Indeed, a small fraction of demolition waste contains components that are hazardous to human health and the environment, e.g., lead-based paint, mercury-contained in fluorescent lamps, treated wood, and asbestos. The objective of this study is to evaluate the release potential of pollutants contained in these hazardous components when they are mixed with inert wastes in unlined landfills. After identification of the different building products which can contain hazardous elements and which can be potentially pollutant in landfill scenario, we performed leaching tests using three different lysimeters: one lysimeter containing only inert wastes and two lysimeters containing inert wastes mixed with hazardous demolition wastes. The leachates from these lysimeters were analysed (heavy metals, chlorides, sulphates fluoride, DOC (Dissolved Organic Carbon), phenol index, and PAH). Finally, we compared concentrations and cumulative releases of elements in leachates with the limits values of European regulation for the acceptance of inert wastes at landfill. Results indicate that limit values are exceeded for some elements. We also performed a percolation column test with only demolition hazardous wastes to evaluate the specific contribution of these wastes in the observed releases.
Demolition waste generation for development of a regional management chain model.
Bernardo, Miguel; Gomes, Marta Castilho; de Brito, Jorge
2016-03-01
Even though construction and demolition waste (CDW) is the bulkiest waste stream, its estimation and composition in specific regions still faces major difficulties. Therefore new methods are required especially when it comes to make predictions limited to small areas, such as counties. This paper proposes one such method, which makes use of data collected from real demolition works and statistical information on the geographical area under study. Based on a correlation analysis between the demolition waste estimates and indicators such as population density, buildings ageing index, buildings density and land occupation type, relationships are established that can be used to determine demolition waste outputs in a given area. The derived models are presented and explained. This methodology is independent from the specific region with which it is exemplified (the Lisbon Metropolitan Area) and can therefore be applied to any region of the world, from the country to the county level. Generation of demolition waste data at the county level is the basis of the design of a systemic model for CDW management in a region. Future developments proposed include a mixed-integer linear programming formulation of such recycling network. Copyright © 2016 Elsevier Ltd. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-12
... Environmental Impact Statement, Tappan Zee Bridge/I-287 Corridor Project (Rockland and Westchester Counties, New... an Environmental Impact Statement (EIS) for the proposed Tappan Zee Bridge/I-287 Corridor project... Port Chester, Westchester County, New York including the Tappan Zee Bridge over the Hudson River. The...
77 FR 25080 - Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
...-AA00 Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR AGENCY: Coast Guard, DHS... trestles and construction cranes involved in the construction of the TriMet Bridge on the Willamette River... project. These safety zones replace the prior safety zones established for the TriMet Bridge construction...
DOT National Transportation Integrated Search
2014-10-01
This project allowed the continuation of collecting monitoring data from Bridge #6139061300401 in the John James Audubon Project : for an additional two-year period. Bridge #6139061300401 was instrumented as part of an earlier project (LTRC Project N...
23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Procedures for bridge replacement and rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration...
23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Procedures for bridge replacement and rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration...
Holman, Devin B.; Hao, Xiying; Topp, Edward; Yang, Hee Eun; Alexander, Trevor W.
2016-01-01
Agricultural operations generate large quantities of manure which must be eliminated in a manner that is consistent with public health guidelines. Meanwhile, construction and demolition waste makes up about 25% of total solid municipal waste. Co-composting of manure with construction and demolition waste offers a potential means to make manure safe for soil amendment and also divert construction and demolition waste from municipal landfills. Therefore, the archaeal, bacterial, and fungal microbiota of two different types of composted cattle manure and one co-composted with construction and demolition waste, were assessed over a 99-day composting period. The microbiota of the three compost mixtures did not differ, but significant changes over time and by sampling depth were observed. Bacillus and Halocella, however, were more relatively abundant in composted manure from cattle fed dried distillers’ grains and solubles. Proteobacteria and Bacteroidetes were enriched at day 0 and Firmicutes at day 99. The fungal genus Kernia was the most relatively abundant overall and was enriched at day 0. The concentration of 12 antimicrobial resistance determinants in the compost mixtures was also determined, and 10 of these determinants decreased significantly from days 0 to 99. The addition of construction and demolition waste did not affect the persistence of antimicrobial resistance genes or community structure of the compost microbiota and therefore co-composting construction and demolition waste with cattle manure offers a safe, viable way to divert this waste from landfills. PMID:27300323
Holman, Devin B; Hao, Xiying; Topp, Edward; Yang, Hee Eun; Alexander, Trevor W
2016-01-01
Agricultural operations generate large quantities of manure which must be eliminated in a manner that is consistent with public health guidelines. Meanwhile, construction and demolition waste makes up about 25% of total solid municipal waste. Co-composting of manure with construction and demolition waste offers a potential means to make manure safe for soil amendment and also divert construction and demolition waste from municipal landfills. Therefore, the archaeal, bacterial, and fungal microbiota of two different types of composted cattle manure and one co-composted with construction and demolition waste, were assessed over a 99-day composting period. The microbiota of the three compost mixtures did not differ, but significant changes over time and by sampling depth were observed. Bacillus and Halocella, however, were more relatively abundant in composted manure from cattle fed dried distillers' grains and solubles. Proteobacteria and Bacteroidetes were enriched at day 0 and Firmicutes at day 99. The fungal genus Kernia was the most relatively abundant overall and was enriched at day 0. The concentration of 12 antimicrobial resistance determinants in the compost mixtures was also determined, and 10 of these determinants decreased significantly from days 0 to 99. The addition of construction and demolition waste did not affect the persistence of antimicrobial resistance genes or community structure of the compost microbiota and therefore co-composting construction and demolition waste with cattle manure offers a safe, viable way to divert this waste from landfills.
DOE's Oak Ridge Site Kick Off Demolition of the K-27 Building
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cange, Sue; Rueter, Ken
2016-02-10
DOE's Oak Ridge Office of Environmental Management kicked off demolition of the K-27 Building this month, moving closer to fulfilling Vision 2016 — removal of all gaseous diffusion buildings from the site by year’s end. As the site's last uranium enrichment building falls, it will mark the first-ever demolition and cleanup of a gaseous diffusion complex anywhere.
76 FR 53054 - Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-25
...-AA00 Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... the TriMet Bridge on the Willamette River, in Portland, OR. This action is necessary to ensure the... Zone: TriMet Bridge Project, Willamette River; Portland, OR in the Federal Register (76 FR 86). We...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Michael R. Kruzic
2008-06-01
Located in Area 25 of the Nevada Test Site (NTS), the Test Cell A (TCA) Facility (Figure 1) was used in the early to mid-1960s for testing of nuclear rocket engines, as part of the Nuclear Rocket Development Program, to further space travel. Nuclear rocket testing resulted in the activation of materials around the reactors and the release of fission products and fuel particles. The TCA facility, known as Corrective Action Unit 115, was decontaminated and decommissioned (D&D) from December 2004 to July 2005 using the Streamlined Approach for Environmental Restoration (SAFER) process, under the Federal Facility Agreement and Consentmore » Order. The SAFER process allows environmental remediation and facility closure activities (i.e., decommissioning) to occur simultaneously, provided technical decisions are made by an experienced decision maker within the site conceptual site model. Facility closure involved a seven-step decommissioning strategy. First, preliminary investigation activities were performed, including review of process knowledge documentation, targeted facility radiological and hazardous material surveys, concrete core drilling and analysis, shield wall radiological characterization, and discrete sampling, which proved to be very useful and cost-effective in subsequent decommissioning planning and execution and worker safety. Second, site setup and mobilization of equipment and personnel were completed. Third, early removal of hazardous materials, including asbestos, lead, cadmium, and oil, was performed ensuring worker safety during more invasive demolition activities. Process piping was to be verified void of contents. Electrical systems were de-energized and other systems were rendered free of residual energy. Fourth, areas of high radiological contamination were decontaminated using multiple methods. Contamination levels varied across the facility. Fixed beta/gamma contamination levels ranged up to 2 million disintegrations per minute (dpm)/100 centimeters squared (cm2) beta/gamma. Removable beta/gamma contamination levels seldom exceeded 1,000 dpm/100 cm2, but, in railroad trenches on the reactor pad containing soil on the concrete pad in front of the shield wall, the beta dose rates ranged up to 120 milli-roentgens per hour from radioactivity entrained in the soil. General area dose rates were less than 100 micro-roentgens per hour. Prior to demolition of the reactor shield wall, removable and fixed contaminated surfaces were decontaminated to the best extent possible, using traditional decontamination methods. Fifth, large sections of the remaining structures were demolished by mechanical and open-air controlled explosive demolition (CED). Mechanical demolition methods included the use of conventional demolition equipment for removal of three main buildings, an exhaust stack, and a mobile shed. The 5-foot (ft), 5-inch (in.) thick, neutron-activated reinforced concrete shield was demolished by CED, which had never been performed at the NTS.« less
Large-Scale Residential Demolition
The EPA provides resources for handling residential demolitions or renovations. This includes planning, handling harmful materials, recycling, funding, compliance assistance, good practices and regulations.
Quantifying construction and demolition waste: An analytical review
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wu, Zezhou; Yu, Ann T.W., E-mail: bsannyu@polyu.edu.hk; Shen, Liyin
2014-09-15
Highlights: • Prevailing C and D waste quantification methodologies are identified and compared. • One specific methodology cannot fulfill all waste quantification scenarios. • A relevance tree for appropriate quantification methodology selection is proposed. • More attentions should be paid to civil and infrastructural works. • Classified information is suggested for making an effective waste management plan. - Abstract: Quantifying construction and demolition (C and D) waste generation is regarded as a prerequisite for the implementation of successful waste management. In literature, various methods have been employed to quantify the C and D waste generation at both regional and projectmore » levels. However, an integrated review that systemically describes and analyses all the existing methods has yet to be conducted. To bridge this research gap, an analytical review is conducted. Fifty-seven papers are retrieved based on a set of rigorous procedures. The characteristics of the selected papers are classified according to the following criteria - waste generation activity, estimation level and quantification methodology. Six categories of existing C and D waste quantification methodologies are identified, including site visit method, waste generation rate method, lifetime analysis method, classification system accumulation method, variables modelling method and other particular methods. A critical comparison of the identified methods is given according to their characteristics and implementation constraints. Moreover, a decision tree is proposed for aiding the selection of the most appropriate quantification method in different scenarios. Based on the analytical review, limitations of previous studies and recommendations of potential future research directions are further suggested.« less
Gottlieb, Nora; Feder-Bubis, Paula
2014-09-01
Thirty-five Bedouin-Arab villages in South Israel are regarded illegal settlements by the state. Consequently, the residents׳ homes are subject to demolition. Based on 12 semi-structured multiple-participant interviews, this paper examines the house demolitions׳ impacts on women, in the context of gendered constructions of social roles and space. It highlights that the marginalized position of Arab-Bedouin women - as women in a patriarchal community, as members of a minority within Israeli society, and as residents of an "invisible" settlement - contributes to the devastating effects of the house demolitions. In particular, the study׳s results show that the house demolitions inflict severe personal and collective trauma, amplified by women׳s primary role as mothers. Paradoxically, the very same role also becomes a source of resilience and political resistance, as women act to defend a sense of home and restore family life in the face of state violence. Copyright © 2014 Elsevier Ltd. All rights reserved.
GIS-based planning system for managing the flow of construction and demolition waste in Brazil.
Paz, Diogo Henrique Fernandes da; Lafayette, Kalinny Patrícia Vaz; Sobral, Maria do Carmo
2018-05-01
The objective of this article was to plan a network for municipal management of construction and demolition waste in Brazil with the assistance of a geographic information system, using the city of Recife as a case study. The methodology was carried out in three stages. The first was to map the illegal construction and demolition of waste disposal points across Recife and classify the waste according to its recyclability. In sequence, a method for indicating suitable areas for installation of voluntary delivery points, for small waste generators, are presented. Finally, a method for indicating suitable areas for the installation of trans-shipment and waste sorting areas, developed for large generators, is presented. The results show that a geographic information system is an essential tool in the planning of municipal construction and demolition waste management, in order to facilitate the spatial analysis and control the generation, sorting, collection, transportation, and final destination of construction and demolition waste, increasing the rate of recovery and recycling of materials.
Environmental Assessment, Project MOUNTAINVIEW Facility, Buckley Air Force Base, Colorado
2011-10-01
Overall, construction and demolition activities would have the potential to result in adverse effects on surface water quality, but the development of a ... Studied in Detail This EA examines potential effects of the Proposed Action and No Action Alternative on 10 resource areas: noise, land use, air...not in a floodplain. Any potential indirect effects on floodplains would be addressed through the use of storm water best management practices
2014-12-01
MA January 2015 3 There are no existing underground stormwater drains in the area of the new Vandenberg Gate Complex. The addition of... stormwater management systems that utilize the pervious landscape, vegetative filtration, sediment removal, infiltration via bioswales, deep sump...Airmen Dormitory construction, a base-wide stormwater standard requires redevelopment projects to reduce stormwater rate and volume by 10% over the
Environmental Assessment for Multiple Projects at Laughlin Air Forc Base, TX
2013-02-06
Table 5 5 Stormwater Concrete Removal 6 Area Disturbed (acres) Average Removal Depth (ft) Concrete Density (lb/ft 3 ) Concrete Removed (lb...600 feet to the north; and, • Repair and improve stormwater drainage and steep slopes at the Laughlin AFB airfield. Construction would include site...of exposed soils from stormwater runoff, best management practices (BMPs) would be implemented during construction and demolition (C&D). These
2008-12-01
extinction of a threatened or endangered species or the demolition of a historical building). For the proposed project alternatives, most resource...Resources The Endangered Species Act (16 USC 1531-1544) requires federal agencies to avoid jeopardizing the continued existence of endangered or...threatened species and avoid destroying or adversely modifying their critical habitat. Federal agencies must evaluate the effects of their actions on
Contact information and guidances for each state and selected territories's environmental agencies and programs relevant to large-scale residential demolition including asbestos, lead, and open burning.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false After a bridge project has been completed (either PE or... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.41 After a bridge project has been completed (either PE or construction) what happens with...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false After a bridge project has been completed (either PE or... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.41 After a bridge project has been completed (either PE or construction) what happens with...
DOE's Oak Ridge Site Kick Off Demolition of the K-27 Building
Cange, Sue; Rueter, Ken
2018-06-21
DOE's Oak Ridge Office of Environmental Management kicked off demolition of the K-27 Building this month, moving closer to fulfilling Vision 2016 â removal of all gaseous diffusion buildings from the site by yearâs end. As the site's last uranium enrichment building falls, it will mark the first-ever demolition and cleanup of a gaseous diffusion complex anywhere.
Saraçoğlu, Cenk; Demirtaş-Milz, Neslihan
2014-01-01
Since the turn of the twenty-first century, Turkish cities have undergone large-scale change through a process referred to as urban transformation, involving, notably, the demolition of inner-city low-income settlements. The official authorities and business circles have resorted to various forms of discourse to justify these projects, which have led to the deportation of a significant number of people to peripheral areas. The discourse of 'natural disasters', for example, suggests that urban transformation is necessary to protect people from some pending event. Probably the most effective application of this discourse has occurred in Izmir, where the risk posed by 'landslides' has played a critical role in the settlement demolitions conducted in the huge inner-city neighbourhood of Kadifekale. By examining the case of Kadifekale, this paper provide some insights into how 'natural disasters' serve as a discourse with which to legitimise the neoliberal logic entrenched in the urban transformation process in Turkey. © 2014 The Author(s). Disasters © Overseas Development Institute, 2014.
PLUTONIUM FINISHING PLANT (PFP) 241-Z LIQUID WASTE TREATMENT FACILITY DEACTIVATION AND DEMOLITION
DOE Office of Scientific and Technical Information (OSTI.GOV)
JOHNSTON GA
2008-01-15
Fluor Hanford, Inc. (FH) is proud to submit the Plutonium Finishing Plant (PFP) 241-Z liquid Waste Treatment Facility Deactivation and Demolition (D&D) Project for consideration by the Project Management Institute as Project of the Year for 2008. The decommissioning of the 241-Z Facility presented numerous challenges, many of which were unique with in the Department of Energy (DOE) Complex. The majority of the project budget and schedule was allocated for cleaning out five below-grade tank vaults. These highly contaminated, confined spaces also presented significant industrial safety hazards that presented some of the most hazardous work environments on the Hanford Site.more » The 241-Z D&D Project encompassed diverse tasks: cleaning out and stabilizing five below-grade tank vaults (also called cells), manually size-reducing and removing over three tons of process piping from the vaults, permanently isolating service utilities, removing a large contaminated chemical supply tank, stabilizing and removing plutonium-contaminated ventilation ducts, demolishing three structures to grade, and installing an environmental barrier on the demolition site . All of this work was performed safely, on schedule, and under budget. During the deactivation phase of the project between November 2005 and February 2007, workers entered the highly contaminated confined-space tank vaults 428 times. Each entry (or 'dive') involved an average of three workers, thus equaling approximately 1,300 individual confined -space entries. Over the course of the entire deactivation and demolition period, there were no recordable injuries and only one minor reportable skin contamination. The 241-Z D&D Project was decommissioned under the provisions of the 'Hanford Federal Facility Agreement and Consent Order' (the Tri-Party Agreement or TPA), the 'Resource Conservation and Recovery Act of 1976' (RCRA), and the 'Comprehensive Environmental Response, Compensation, and Liability Act of 1980' (CERCLA). The project completed TPA Milestone M-083-032 to 'Complete those activities required by the 241-Z Treatment and Storage Unit's RCRA Closure Plan' four years and seven months ahead of this legally enforceable milestone. In addition, the project completed TPA Milestone M-083-042 to 'Complete transition and dismantlement of the 241-2 Waste Treatment Facility' four years and four months ahead of schedule. The project used an innovative approach in developing the project-specific RCRA closure plan to assure clear integration between the 241-Z RCRA closure activities and ongoing and future CERCLA actions at PFP. This approach provided a regulatory mechanism within the RCRA closure plan to place segments of the closure that were not practical to address at this time into future actions under CERCLA. Lessons learned from th is approach can be applied to other closure projects within the DOE Complex to control scope creep and mitigate risk. A paper on this topic, entitled 'Integration of the 241-Z Building D and D Under CERCLA with RCRA Closure at the PFP', was presented at the 2007 Waste Management Conference in Tucson, Arizona. In addition, techniques developed by the 241-Z D&D Project to control airborne contamination, clean the interior of the waste tanks, don and doff protective equipment, size-reduce plutonium-contaminated process piping, and mitigate thermal stress for the workers can be applied to other cleanup activities. The project-management team developed a strategy utilizing early characterization, targeted cleanup, and close coordination with PFP Criticality Engineering to significantly streamline the waste- handling costs associated with the project . The project schedule was structured to support an early transition to a criticality 'incredible' status for the 241-Z Facility. The cleanup work was sequenced and coordinated with project-specific criticality analysis to allow the fissile material waste being generated to be managed in a bulk fashion, instead of individual waste packages. This approach negated the need for real-time assay of individual waste packages, greatly improving the efficiency of the cleanup operation. The cleanup and stabilization of the 241-2 Liquid Effluent Treatment Facility reduced radiological risks to the environment and Hanford site workers. It was recognized as a success by regulatory agencies, the media, the DOE-client, and stakeholders. The 241-Z D&D Project demonstrated management excellence in adapting to significant changes in project direction, fostered a safety culture that amassed impressive results on this high-hazard job, maintained excellent communications with the client and stakeholders, and developed and implemented unique cleanup techniques.« less
SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT
DOE Office of Scientific and Technical Information (OSTI.GOV)
NORTON SH
2010-02-23
CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material.more » The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford nuclear reservation. Workers had to pass through metal detectors when they arrived at the plant and materials leaving the plant had to be scanned for security reasons. Whereas other high-security nuclear materials were shipped from the PFP to Savannah River, S.C. as part ofa Department of Energy (DOE) program to consolidate weapons-grade plutonium, it was determined that the SIF should remain onsite pending disposition to a national repository. Nevertheless, the SIF still requires a high level of security that the PFP complex has always provided. With the 60-year PFP mission of producing and storing plutonium concluded, the environmental cleanup plans for Hanford call for the demolition of the 63-building PFP complex. Consequently, if the SIF remained at PFP it not only would have interfered with the environmental cleanup plans, but would have required $100 million in facility upgrades to meet increased national security requirements imposed after the 9/11 terrorist attacks. A new smaller and more cost-effective area was needed to store this material, which led to the SIF Project. Once the SIF project was successfully completed and the SIF was safely removed from PFP, the existing Protected Area at PFP could be removed, and demolition could proceed more quickly without being encumbered by restrictive security requirements that an active Protected Area requires. The lightened PFP security level brought by safely removing and storing the SIF would also yield lowered costs for deactivation and demolition, as well as reduce overall life-cycle costs.« less
NHDOT : process for municipally-managed state bridge aid program projects
DOT National Transportation Integrated Search
2007-09-12
The document sets for the requirements for a municipality which to manage the design and construction of a bridge rehabilitation or replacement project and receive Bridge Aid under the applicable provisions of RSA 234. Bridge Aid provided to a Munici...
Disaster Debris Recovery Database - Recovery
The US EPA Region 5 Disaster Debris Recovery Database includes public datasets of over 6,000 composting facilities, demolition contractors, transfer stations, landfills and recycling facilities for construction and demolition materials, electronics, household hazardous waste, metals, tires, and vehicles in the states of Illinois, Indiana, Iowa, Kentucky, Michigan, Minnesota, Missouri, North Dakota, Ohio, Pennsylvania, South Dakota, West Virginia and Wisconsin.In this update, facilities in the 7 states that border the EPA Region 5 states were added to assist interstate disaster debris management. Also, the datasets for composters, construction and demolition recyclers, demolition contractors, and metals recyclers were verified and source information added for each record using these sources: AGC, Biocycle, BMRA, CDRA, ISRI, NDA, USCC, FEMA Debris Removal Contractor Registry, EPA Facility Registry System, and State and local listings.
Disaster Debris Recovery Database - Landfills
The US EPA Region 5 Disaster Debris Recovery Database includes public datasets of over 6,000 composting facilities, demolition contractors, transfer stations, landfills and recycling facilities for construction and demolition materials, electronics, household hazardous waste, metals, tires, and vehicles in the states of Illinois, Indiana, Iowa, Kentucky, Michigan, Minnesota, Missouri, North Dakota, Ohio, Pennsylvania, South Dakota, West Virginia and Wisconsin.In this update, facilities in the 7 states that border the EPA Region 5 states were added to assist interstate disaster debris management. Also, the datasets for composters, construction and demolition recyclers, demolition contractors, and metals recyclers were verified and source information added for each record using these sources: AGC, Biocycle, BMRA, CDRA, ISRI, NDA, USCC, FEMA Debris Removal Contractor Registry, EPA Facility Registry System, and State and local listings.
Bridges and the City: An Interdisciplinary Project.
ERIC Educational Resources Information Center
Singer, Judith Y.; Goodman, Cecelia; Ridley, Theodora; Singer, Alan
2000-01-01
Describes an interdisciplinary project to help elementary school children discover the relationship among technology, history, and geography that involved the building of a model Brooklyn Bridge and considering the history and role of the real bridge. Suggestions for similar projects for other cities are appended. (JPB)
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-25
... on Proposed Bridge Rehabilitation and Restoration in Massachusetts AGENCY: Federal Highway...(l)(1). The action relates to the proposed Longfellow Bridge Rehabilitation and Restoration Project... issuing approval for the following bridge/highway improvement project in the Commonwealth of Massachusetts...
Demolition of Munitions Storage Area Facilities. Right Size Project 10-0192C
2011-07-01
area of the Proposed Action. 3.4.2 Affected Environment Fairchild AFB is situated within the channeled scablands of the Columbia River Basin which...grebe, great blue heron, turkey vulture, Caspian tern , black tern , and osprey. The white-tailed jackrabbit, a state candidate species, is known to...Geography The MSA is located in the Upper Columbia River Basin Basalt Geomorphic Province and lies within the Latah Creek watershed. The landtype is
“We Need to Have a Meeting”: Public Housing Demolition and Collective Agency in Atlanta, Georgia
Keene, Danya E.
2017-01-01
The last two decades have witnessed widespread demolition of public housing and a large-scale relocation of public housing residents. Much of the current literature has examined the impact of demolition on relocated residents, focusing primarily on individual outcomes such as employment, housing quality, and health. This article examines the potential collective consequences of relocation by using data from 40 in-depth interviews conducted with relocated public housing residents in Atlanta, Georgia, to examine experiences of civic engagement and tenant activism before and after relocation. Participants describe frequent experiences of civic engagement and tenant activism in their public housing communities prior to demolition and also discuss how these collective actions often translated into meaningful gains for their communities. Participants also describe challenges associated with reestablishing these sources of collective agency in their new, post demolition, private-market rental communities where opportunities for civic engagement and tenant activism were perceived to be limited, where stigma was a barrier to social interaction, and where they experienced significant residential instability. PMID:29321697
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-16
...-AA00 Safety Zone; Eisenhower Expressway Bridge Rehabilitation Project; Chicago River South Branch... the Eisenhower Expressway Bridge. This temporary safety zone is necessary to protect the surrounding... Bridge. Entry into this zone is prohibited unless specifically authorized by the Captain of the Port...
77 FR 6622 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-08
... on Proposed Bridge Replacement in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT... relates to the proposed Whittier Bridge (Interstate 95 over the Merrimack River) replacement/1-95... bridge/highway improvement project in the Commonwealth of Massachusetts. The proposed project involves as...
77 FR 15009 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-14
...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... zones to remain in effect throughout the duration of the construction and renewal of the Sellwood Bridge... safe distance from the construction area while transiting in the vicinity of the Sellwood Bridge...
Household Hazardous Waste and Demolition
Household wastes that are toxic, corrosive, ignitable, or reactive are known as Household Hazardous Waste (HHW). Household Hazardous Waste may be found during residential demolitions, and thus require special handling for disposal.
Use of Aqueous Foam to Mitigate Demolitions Noise
1981-12-01
Training Nobe. From Rangei"liboratory too USE OF AQUEOUS FOAM TO MITIGATE DEMOLITIONS NOISE LEYVEL S• • , ELECTE by Richard Rapet INM Approved for public...Subtitle) S. TYPE OF REPORT A PERIOD CovERED Use of Aqueous Foam to Mitigate Demolitions Noise FINAL -6 PERf,’RMING ORO. REPORT NUMSER 7. AUTHOR(a) S...1noise reduction * ; foam i 20. A"iTn ACT 001 mi, mm OI* N n-*-my Old 01idmiup by block misw) This report describes an investigation into whether aqueous
1990-07-01
at the different skill levels are: C-1 a. MOSC 12B10. Assists combat engineers by performing combat construction, combat demolitions, and related...duties. b. MOSC 12B20. Performs as team leader and assistant squad leader in combat construction, demolition, and duties. c. MOSC 12B30. Serves as squad...instructor. d. MOSC 12B40. Serves as platoon sergeant; as operations sergeant; as construction inspector; as advisor to supported units, allied forces
Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic
NASA Astrophysics Data System (ADS)
Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan
2017-10-01
Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.
DOT National Transportation Integrated Search
2017-03-01
In Implementation Project 5-6719, a non-composite continuous steel girder bridge located in Lakeport, Texas will be strengthened using techniques developed in TxDOT Research Project 0-6719. This strengthening technique involves the use of post-instal...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-09
...-AA11 Regulated Navigation Area; S99 Alford Street Bridge Rehabilitation Project, Mystic River, MA... Mystic River under and surrounding the S99 Alford Street Bridge which crosses the Mystic River between... construction workers by restricting vessel traffic during periods where the bridge is being repaired. DATES...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-26
... 1625-AA11 Regulated Navigation Area--Tappan Zee Bridge Construction Project, Hudson River; South Nyack... Hudson River surrounding the Tappan Zee Bridge. This temporary interim rule allows the Coast Guard to enforce speed and wake restrictions and prohibit all vessel traffic through the RNA during bridge...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-13
... Final Environmental Impact Statement for the Goethals Bridge Replacement Project AGENCY: Coast Guard... the 82-year old Goethals Bridge across the Arthur Kill between Staten Island, NY, and Elizabeth, NJ... proposed Goethals Bridge Replacement Project. DATES: The review period for the FEIS will close on September...
Mercury-Containing Devices and Demolition
Some items inside residential buildings contain mercury, which poses a persistent and toxic human health and environmental threat. These materials should be carefully salvaged for proper recycling to prevent mercury contamination prior to demolition.
Life Cycle Energy Analysis of Reclaimed Water Reuse Projects in Beijing.
Fan, Yupeng; Guo, Erhui; Zhai, Yuanzheng; Chang, Andrew C; Qiao, Qi; Kang, Peng
2018-01-01
To illustrate the benefits of water reuse project, the process-based life cycle analysis (LCA) could be combined with input-output LCA to evaluate the water reuse project. Energy is the only evaluation parameter used in this study. Life cycle assessment of all energy inputs (LCEA) is completed mainly by the life cycle inventory (LCI), taking into account the full life cycle including the construction, the operation, and the demolition phase of the project. Assessment of benefit from water reuse during the life cycle should focus on wastewater discharge reduction and water-saving benefits. The results of LCEA of Beijing water reuse project built in 2014 in a comprehensive way shows that the benefits obtained from the reclaimed water reuse far exceed the life cycle energy consumption. In this paper, the authors apply the LCEA model to estimate the benefits of reclaimed water reuse projects quantitatively.
Landlord project multi-year program plan, fiscal year 1999, WBS 1.5
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dallas, M.D.
The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste,more » electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.« less
36 CFR 72.41 - Demolition and replacement of existing recreation properties.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK AND RECREATION RECOVERY ACT OF 1978 Grants for Recovery Action Program Development, Rehabilitation and Innovation § 72.41 Demolition and replacement of existing...
Developing a systematic approach to demolition can help manage liability, control, and costs. Careful planning can minimize the release of toxic chemicals and other harmful substances into the environment, and protect the health of workers and the public.
Discovery of Asbestos After Demolition is Underway
Asbestos National Emissions Standard for Hazardous Air Pollutants Applicability Determination about additional friable asbestos material that arises during renovation or demolition being subject to the regulations from the time of creation or discovery
Harmful Materials and Residential Demolition
Certain harmful or problematic materials present in residential buildings may need to be handled differently from general demolition debris. Here is a list of several specific types of materials that may be present in residential buildings.
How EPA's Asbestos Regulations Apply to Transite Siding
Letters that provide guidance on asbestos National Emissions Standard of Hazardous Air Pollutants (NESHAP) applicability to transite sliding in demolitions, specifically regarding friability, and removal requirements prior to, and after, demolition.
Recycling the construction and demolition waste to produce polymer concrete
NASA Astrophysics Data System (ADS)
Hamza, Mohammad T.; Hameed, Awham M., Dr.
2018-05-01
The sustainable management for solid wastes of the construction and demolition waste stimulates searching for safety applications for these wastes. The aim of this research is recycling of construction and demolition waste with some different types of polymeric resins to be used in manufacturing process of polymer mortar or polymer concrete, and studying their mechanical and physical properties, and also Specify how the values of compressive strength and the density are affected via the different parameters. In this research two types of construction and demolition waste were used as aggregates replacement (i.e. waste cement/concrete debris, and the waste blocks) while the two types of polymer resins (i.e. Unsaturated polyester and Epoxy) as cement replacements. The used weight percentages of the resins were changed within (1°, 20, 25 and 30) % to manufacture this polymer concrete.
Final Environmental Assessment Addressing Building Demolition at Kirtland Air Force Base, New Mexico
2010-04-01
erosion potential and runoff; therefore, short-term and long-term, adverse effects on surface waters would be less than significant. Additionally... potential effects on a project site and adjacent land uses. The foremost factor affecting a proposed action in terms of land use is its compliance with...of 50 to 55 dBA or higher on a daily basis. Studies specifically conducted to determine noise effects on various human activities show that about 90
Wu, Zezhou; Yu, Ann T W; Shen, Liyin
2017-02-01
The abundant generation of construction and demolition (C&D) waste presents a significant challenge to the sustainable development of the construction industry in Mainland China. As the implementer of construction activities, the contractor's C&D waste management performance plays an important role in C&D waste minimization. This paper aims to investigate the determinants of the contractor's C&D waste management behavior in Mainland China. The Theory of Planned Behavior (TPB) was selected as the basis of the theoretical model. In addition, three contextual constructs (i.e., economic viability, governmental supervision, and project constraints) were introduced, formulating the initial model. Based on the initial model, eight constructs were identified and seven hypotheses were proposed. A questionnaire survey was conducted to collect data and a Structural Equation Modeling (SEM) analysis was employed to test the proposed hypotheses. Results showed that the C&D waste management intention is not a significant determinant of contractor's C&D waste management behavior. The most important determinant is economic viability, followed by governmental supervision as the second most important determinant. Nevertheless, the construct of project constraints is an insignificant determinant for contractor's adoption of C&D waste management behavior. The research findings imply that, in Mainland China, the government, at this stage, plays an important role in guiding and promoting the contractor to exhibit better C&D waste management behavior. Copyright © 2016 Elsevier Ltd. All rights reserved.
Ambient exposure to coarse and fine particle emissions from building demolition
NASA Astrophysics Data System (ADS)
Azarmi, Farhad; Kumar, Prashant
2016-07-01
Demolition of buildings produce large quantities of particulate matter (PM) that could be inhaled by on-site workers and people living in the neighbourhood, but studies assessing ambient exposure at the real-world demolition sites are limited. We measured concentrations of PM10 (≤10 μm), PM2.5 (≤2.5 μm) and PM1 (≤1 μm) along with local meteorology for 54 working hours over the demolition period. The measurements were carried out at (i) a fixed-site in the downwind of demolished building, (ii) around the site during demolition operation through mobile monitoring, (iii) different distances away from the demolition site through sequential monitoring, and (iv) inside an excavator vehicle cabin and on-site temporary office for engineers. Position of the PM instrument was continuously recorded using a Global Positioning System on a second basis during mobile measurements. Fraction of coarse particles (PM2.5-10) contributed 89 (with mean particle mass concentration, PMC ≈ 133 ± 17 μg m-3), 83 (100 ± 29 μg m-3), and 70% (59 ± 12 μg m-3) of total PMC during the fixed-site, mobile monitoring and sequential measurements, respectively, compared with only 50% (mean 12 ± 6 μg m-3) during the background measurements. The corresponding values for fine particles (PM2.5) were 11, 17 and 30% compared with 50% during background, showing a much greater release of coarse particles during demolition. The openair package in R and map source software (ArcGIS) were used to assess spatial variation of PMCs in downwind and upwind of the demolition site. A modified box model was developed to determine the emission factors, which were 210, 73 and 24 μg m-2 s-1 for PM10, PM2.5 and PM1, respectively. The average respiratory deposited doses to coarse (and fine) particles inside the excavator cabin and on-site temporary office increased by 57- (and 5-) and 13- (and 2-) times compared with the local background level, respectively. The monitoring stations in downwind direction illustrated a logarithmic decrease of PM with distance. Energy-dispersive X-ray spectroscopy and scanning electron microscopy were used to assess physicochemical features of particles. The minerals such as silica were found as a marker of demolition dust and elements such as sulphur coming from construction machinery emissions. Findings of this study highlight a need to limit occupational exposure of individuals to coarse and fine particles by enforcing effective engineering controls.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-31
... on Proposed Bridge and Approach Roadways in Nevada and Arizona AGENCY: Federal Highway Administration...)(1). The actions relate to the proposed Laughlin-Bullhead City Bridge project in Laughlin, Clark... bridge and roadway project will be barred unless the claim is filed on or before February 27, 2012. If...
76 FR 25278 - Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-04
...-AA00 Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... safety zone during the construction of the TriMet Bridge on the Willamette River, in Portland, OR. This..., will be starting construction of the new Portland-Milwaukie Light Rail Bridge on July 1, 2011 (with in...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-12
...-AA11 Regulated Navigation Area; S99 Alford Street Bridge Rehabilitation Project, Mystic River, MA... against hazardous conditions created by repair work on the S99 Alford Street Bridge across the Mystic... Coast Guard to establish a regulated navigation area in connection with the S99 Alford Street Bridge...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-03
...-AA00 Safety Zone; AICW Closure Safety Zone for Ben Sawyer Bridge Replacement Project, Sullivan's Island... replacement of the old and new approach spans of the Ben Sawyer Swing Bridge. This regulation is necessary to... proposed rulemaking (NPRM) with respect to this rule because hazards associated with the bridge replacement...
DOE Office of Scientific and Technical Information (OSTI.GOV)
CALDERONE,JAMES J.; GARBIN,H. DOUGLAS
2001-08-01
Public concern regarding the effects of noise generated by the detonation of excess and obsolete explosive munitions at U.S. Army demolition ranges is a continuing issue for the Army's demilitarization and disposal groups. Recent concerns of citizens living near the McAlester Army Ammunition Plant (MCAAP) in Oklahoma have lead the U.S. Army Defense Ammunition Center (DAC) to conduct a demonstration and evaluation of noise abatement techniques that could be applied to the MCAAP demolition range. With the support of the DAC, MCAAP, and Sandia National Laboratories (SNL), three types of noise abatement techniques were applied: aqueous foams, overburden (using combinationsmore » of sand beds and dirt coverings), and rubber or steel blast mats. Eight test configurations were studied and twenty-four experiments were conducted on the MCAAP demolition range in July of 2000. Instrumentation and data acquisition systems were fielded for the collection of near-field blast pressures, far-field acoustic pressures, plant boundary seismic signals, and demolition range meteorological conditions. The resulting data has been analyzed and reported, and a ranking of each technique's effects has been provided to the DAC.« less
Chang, N B; Lin, K S; Sun, Y P; Wang, H P
2001-12-01
This paper confirms both technical feasibility and economic potential via the use of redundant brick kilns as an alternative option for disposal of the combustible fractions of construction and demolition wastes by a three-stage analysis. To assess such an idea, one brick kiln was selected for performing an engineering feasibility study. First of all, field sampling and lab-analyses were carried out to gain a deeper understanding of the physical, chemical, and thermodynamic properties of the combustible fractions of construction and demolition wastes. Kinetic parameters for the oxidation of the combustible fractions of construction and demolition wastes were therefore numerically calculated from the weight loss data obtained through a practice of thermogravimetric analyzer (TGA). Secondly, an engineering assessment for retrofitting the redundant brick kiln was performed based on integrating several new and existing unit operations, consisting of waste storage, shredding, feeding, combustion, flue gas cleaning, and ash removal. Such changes were subject to the operational condition in accordance with the estimated mass and energy balances. Finally, addressing the economic value of energy recovery motivated a renewed interest to convert the combustible fractions of construction and demolition wastes into useful hot water for secondary uses.
Managing Stormwater and Dust at Demolition Sites
Learn how to manage stormwater and dust at demolition sites, including developing a stormwater solution prevention plan, best practices for erosion, runoff and sediment control to reduce environmental impacts and comply with environmental regulations.
35 mm PHOTOGRAPH TAKEN PRIOR TO DEMOLITION OF STRUCTURE. SOUTH ...
35 mm PHOTOGRAPH TAKEN PRIOR TO DEMOLITION OF STRUCTURE. SOUTH (SIDE) AND EAST (FRONT) ELEVATIONS OF BUILDING. VIEW TO NORTHWEST - Plattsburgh Air Force Base, Gas Station, New York Road, Plattsburgh, Clinton County, NY
ERIC Educational Resources Information Center
Berney, Tomi D.; Adelman, Miriam
The Bilingual Resources for Development of Gainful Employment skills (Project BRIDGES) was a federally-funded program in its second year of a 3-year funding cycle. Project BRIDGES aimed at developing the academic and vocational skills of limited-English-proficient (LEP) students who had failed two or more classes and were at risk of dropping out.…
How EPA's Asbestos Regulations Apply to Municipal Demolition Activities
Memos about the Asbestos National Emissions Standard for Hazardous Air Pollutants provide clarification on demolition concerns such as the definition of a facility, and the applicability of asbestos NESHAP to structures demolished by municipal entities.
A Guide to Normal Demolition Practices Under the Asbestos NESHAP (EPA-340/1-92-013)
This document includes demolition practices, waste handling procedures, and definitions of terms taken from the November 20,1990 revision of the asbestos National Emissions Standard for Hazardous Air Pollutants regulation.
6. Detail of interior bin wall section, during demolition. Shows ...
6. Detail of interior bin wall section, during demolition. Shows alternating courses of channel tile with steel bands and largers hollow tile. - Saint Anthony Elevator No. 3, 620 Malcom Avenue, Southeast, Minneapolis, Hennepin County, MN
Pilot-based assessment of the economics of recycling construction demolition waste.
Srour, Issam M; Chehab, Ghassan R; El-Fadel, Mutasem; Tamraz, Sandy
2013-11-01
The significant amount of waste generated from construction demolition has become a chronic problem in many developing countries. Using data obtained from demolition contractors and various other sources, this paper proposes a framework for proper handling of construction demolition waste (CDW) to serve as a decision support tool in countries suffering from the lack of national CDW management guidelines. The framework is then demonstrated through a case study in the city of Beirut, Lebanon, and a sensitivity analysis is carried out to examine the economic feasibility of developing a recycling facility. The analysis showed that in order for a facility to be feasible, a gate fee should be charged in the presence of a market for recycled aggregates. The results confirm the significance of instigating and implementing legislation to control illegal dumping, constructing, and managing engineered landfills, and establishing markets for recycled CDW.
DOT National Transportation Integrated Search
2006-01-01
The Bridges Decision Support Model is a geographic information system (GIS) that assembles existing : data on archaeological sites, surveys, and their geologic contexts to assess the risk of bridge replacement : projects encountering 13,000- to 150-y...
Evaluation of continuity detail for precast prestressed girders : research project capsule.
DOT National Transportation Integrated Search
2008-03-01
The construction of a new bridge : crossing the Mississippi River north of : Baton Rouge is currently underway. The : project, named the John James : Audubon Bridge, is a true landmark. Its : main span will be the longest cablestayed : bridge in Nort...
31. U.S. WORKS PROGRAM GRADE CROSSING PROJECT, (TITLE PAGE) W.P.G.M. ...
31. U.S. WORKS PROGRAM GRADE CROSSING PROJECT, (TITLE PAGE) W.P.G.M. NO-301, WEST BRIDGE STREET. Sheet 1 of 10 - Notre Dame Bridge, Spanning Merrimack River on Bridge Street, Manchester, Hillsborough County, NH
Evaluation of a bridge deck with CFRP prestressed panels under fatigue load cycles
DOT National Transportation Integrated Search
2003-09-01
This report summarizes a study conducted under an IBRC (Innovative Bridge Research and Construction) project sponsored by the FHWA. In this project, a bridge deck with CFRP (carbon fiber reinforced polymeric) prestressed panels and cast-in-place topp...
Bridge maintenance Program for the City of Columbia, Missouri : final report.
DOT National Transportation Integrated Search
2017-09-22
The goal of this project was to extend the service lives of bridges located in Columbia, Missouri. The objective of the project was to develop guidelines for bridge maintenance and preservation. The guidelines developed are focused on practical and i...
The September 2013 EPA Region 5 report and factsheet provide tools to help with waste management plans, waste disposal, handling hazardous materials, and earthwork. The documents also suggest demolition modifications to improve environmental results.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Detrimental to Their Health or Well-Being § 570.66 Occupations involved in wrecking, demolition, and... and 18 years of age and detrimental to their health and well-being. (b) Definition. The term wrecking...
Senseless demolition in progress, showing destruction of perfectly decent and ...
Senseless demolition in progress, showing destruction of perfectly decent and recyclable mill building. Problem exacerbated by high value of scrap iron. - Phoenix Iron Company, Rolling Mill, North of French Creek, west of Fairview Avenue, Phoenixville, Chester County, PA
Improvement of the material and transport component of the system of construction waste management
NASA Astrophysics Data System (ADS)
Kostyshak, Mikhail; Lunyakov, Mikhail
2017-10-01
Relevance of the topic of selected research is conditioned with the growth of construction operations and growth rates of construction and demolition wastes. This article considers modern approaches to the management of turnover of construction waste, sequence of reconstruction or demolition processes of the building, information flow of the complete cycle of turnover of construction and demolition waste, methods for improvement of the material and transport component of the construction waste management system. Performed analysis showed that mechanism of management of construction waste allows to increase efficiency and environmental safety of this branch and regions.
Characterizing the environmental impact of metals in construction and demolition waste.
Yu, Danfeng; Duan, Huabo; Song, Qingbin; Li, Xiaoyue; Zhang, Hao; Zhang, Hui; Liu, Yicheng; Shen, Weijun; Wang, Jinben
2018-05-01
Large quantities of construction and demolition (C&D) waste are generated in China every year, but their potential environmental impacts on the surrounding areas are rarely assessed. This study focuses on metals contained in C&D waste, characterizing the metal concentrations and their related environmental risks. C&D waste samples were collected in Shenzhen City, China, from building demolition sites, renovation areas undergoing refurbishment, landfill sites, and recycling companies (all located in Shenzhen city) that produce recycled aggregate, in order to identify pollution levels of the metals As, Cd, Cr, Cu, Pb, Ni, and Zn. The results showed that (1) the metal concentrations in most demolition and renovation waste samples were below the soil environmental quality standard for agricultural purposes (SQ-Agr.) in China; (2) Cd, Cu, and Zn led to relatively higher environmental risks than other metals, especially for Zn (DM5 tile sample, 360 mg/kg; R4 tile sample, 281 mg/kg); (3) non-inert C&D waste such as wall insulation and foamed plastic had high concentrations of As and Cd, so that these materials required special attention for sound waste management; and (4) C&D waste collected from landfill sites had higher concentrations of Cd and Cu than did waste collected from demolition and refurbishment sites.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
A weekly update of the Recovery Act at work. Demolition of U-Ancillary that was contaminated with uranium and asbestos as well as removing asbestos from the Steam Generation Plant in the 200 East Area.
24 CFR 969.107 - HUD approval of demolition or disposition before ACC expiration.
Code of Federal Regulations, 2010 CFR
2010-04-01
... disposition before ACC expiration. 969.107 Section 969.107 Housing and Urban Development Regulations Relating... before ACC expiration. This part is not intended to preclude or restrict the demolition or disposition of... before the ACC Expiration Date. ...
None
2018-05-23
A weekly update of the Recovery Act at work. Demolition of U-Ancillary that was contaminated with uranium and asbestos as well as removing asbestos from the Steam Generation Plant in the 200 East Area.
Life cycle assessment of the end-of-life phase of a residential building.
Vitale, Pierluca; Arena, Noemi; Di Gregorio, Fabrizio; Arena, Umberto
2017-02-01
The study investigates the potential environmental impacts related to the end-of-life phase of a residential building, identified in a multifamily dwelling of three levels, constructed in the South of Italy by utilizing conventional materials and up-to-date procedures. An attributional life cycle assessment has been utilised to quantify the contributions of each stage of the end-of-life phase, with a particular attention to the management of the demolition waste. The investigation takes into account the selective demolition, preliminary sorting and collection of main components of the building, together with the processes of sorting, recycling and/or disposal of main fractions of the demolition waste. It quantifies the connections between these on-site and off-site processes as well as the main streams of materials sent to recycling, energy recovery, and final disposal. A sensitivity analysis has been eventually carried out by comparing the overall environmental performances of some alternative scenarios, characterised by different criteria for the demolition of the reference building, management of demolition waste and assessment of avoided burdens of the main recycled materials. The results quantify the advantage of an appropriate technique of selective demolition, which could increase the quality and quantity of residues sent to the treatment of resource recovery and safe disposal. They also highlight the contributions to the positive or negative environmental impact of each stage of the investigated waste management system. The recycling of reinforcing steel appears to play a paramount role, accounting for 65% of the total avoided impacts related to respiratory inorganics, 89% of those for global warming and 73% of those for mineral extraction. Copyright © 2016 Elsevier Ltd. All rights reserved.
Instrumentation to Aid in Steel Bridge Fabrication : Bridge Virtual Assembly System
DOT National Transportation Integrated Search
2018-05-01
This pool funded project developed a BRIDGE VIRTUAL ASSEMBLY SYSTEM (BRIDGE VAS) that improves manufacturing processes and enhances quality control for steel bridge fabrication. The system replaces conventional match-drilling with virtual assembly me...
23 CFR 650.703 - Eligible projects.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Eligible projects. 650.703 Section 650.703 Highways..., STRUCTURES, AND HYDRAULICS Discretionary Bridge Candidate Rating Factor § 650.703 Eligible projects. (a..., provided that the total project cost for a discretionary bridge candidate is at least $10 million or twice...
23 CFR 650.703 - Eligible projects.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Eligible projects. 650.703 Section 650.703 Highways..., STRUCTURES, AND HYDRAULICS Discretionary Bridge Candidate Rating Factor § 650.703 Eligible projects. (a..., provided that the total project cost for a discretionary bridge candidate is at least $10 million or twice...
23 CFR 650.703 - Eligible projects.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Eligible projects. 650.703 Section 650.703 Highways..., STRUCTURES, AND HYDRAULICS Discretionary Bridge Candidate Rating Factor § 650.703 Eligible projects. (a..., provided that the total project cost for a discretionary bridge candidate is at least $10 million or twice...
23 CFR 650.703 - Eligible projects.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Eligible projects. 650.703 Section 650.703 Highways..., STRUCTURES, AND HYDRAULICS Discretionary Bridge Candidate Rating Factor § 650.703 Eligible projects. (a..., provided that the total project cost for a discretionary bridge candidate is at least $10 million or twice...
23 CFR 650.703 - Eligible projects.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Eligible projects. 650.703 Section 650.703 Highways..., STRUCTURES, AND HYDRAULICS Discretionary Bridge Candidate Rating Factor § 650.703 Eligible projects. (a..., provided that the total project cost for a discretionary bridge candidate is at least $10 million or twice...
Overview On Alternative Asbestos Control Method Research: Alternative Methods To Demolition
The Alternative Asbestos Control Method (AACM) is an experimental approach to building demolition. Unlike the NESHAP method, the AACM allows some regulated asbestos-containing material to remain in the building and a surfactant-water solution is used to suppress asbestos fibers ...
New Hires, Building Demolition
None
2017-12-09
Using Recovery Act funding, Department of Energy contractor CH2M HILL Plateau Remediation Company has hired hundreds of new employees to do cleanup work at the Hanford Site, including demolition of dozens of excess facilities.This video was produced by CH2M HILL on Jan. 8, 2010.
Quantities of Arsenic-Treated Wood in Demolition Debris Generated by Hurricane Katrina
Dubey, Brajesh; Solo-Gabriele, Helena M.; Townsend, Timothy G.
2008-01-01
The disaster debris from Hurricane Katrina is one of the largest in terms of volume and economic loss in American history. One of the major components of the demolition debris is wood waste of which a significant proportion is treated with preservatives, including preservatives containing arsenic. As a result of the large scale destruction of treated wood structures such as electrical poles, fences, decks, and homes a considerable amount of treated wood and consequently arsenic will be disposed as disaster debris. In this study an effort was made to estimate the quantity of arsenic disposed through demolition debris generated in the Louisiana and Mississippi area through Hurricane Katrina. Of the 72 million cubic meters of disaster debris generated, roughly 12 million cubic meters were in the form of construction and demolition wood resulting in an estimated 1740 metric tons of arsenic disposed. Management of disaster debris should consider the relatively large quantities of arsenic associated with pressure-treated wood. PMID:17396637
Phase and widening construction of steel bridges : [summary].
DOT National Transportation Integrated Search
2014-03-01
Maintaining traffic flow for bridge widening and replacement projects often requires bridges to be constructed in phases so that traffic can travel on one : portion of the bridge while another portion is being : constructed. The bridge portions are t...
DOT National Transportation Integrated Search
2013-01-01
The overarching goal of this project is to deploy and assess an innovative corrosion-free bridge construction technology for long-term : performance of new and existing bridges. The research objective of this project is to conduct a comprehensive stu...
DOT National Transportation Integrated Search
2013-01-01
The overarching goal of this project is to deploy and assess an innovative corrosion-free bridge construction technology for long-term : performance of new and existing bridges. The research objective of this project is to conduct a comprehensive stu...
NASA Astrophysics Data System (ADS)
Liu, Xin-Chang
2017-02-01
Recently, entanglement plays an important role in quantum information science. Here we propose an efficient and applicable method which transforms arbitrary three-qubit unknown state to a maximally entangled Greenberger-Horne-Zeilinger state, and the proposed method could be further generalized to multi-qubit case. The proposed setup exploits only linear optical elements and quantum non-demolition detectors using cross-Kerr media. As the quantum non-demolition detection could reveal us the output state of the photons without destroying them. This property may make our proposed setup flexible and can be widely used in current quantum information science and technology.
Live load monitoring for the I-10 twin span bridge : research project capsule.
DOT National Transportation Integrated Search
2014-10-01
To establish a site-specific database for bridge evaluation and future bridge design, : DOTD established a long-term health monitoring system at the I-10 Twin Span Bridge. : The bridge is instrumented from deck to piles to capture bridge response (bo...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beranich, S.J.
1994-08-24
This report evaluates the impacts assessment and proposed mitigations provided in environmental documents concerning the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The projected impacts and proposed mitigations identified in UMTRA Project environmental documents were evaluated for two UMTRA Project sites. These sites are Gunnison and Durango, which are representative of currently active and inactive UMTRA Project sites, respectively. National Environmental Policy Act (NEPA) documentation was prepared for the remedial action at Durango and Gunnison as well as for the provision of an alternate water supply system at Gunnison. Additionally, environmental analysis was completed formore » mill site demolition Gunnison, and for a new road related to the Durango remedial action. The results in this report pertain only to the impact assessments prepared by the Regulatory Compliance staff as a part of the NEPA compliance requirements. Similarly, the mitigative measures documented are those that were identified during the NEPA process.« less
Quantum non demolition measurement of cyclotron excitations in a Penning trap
NASA Technical Reports Server (NTRS)
Marzoli, Irene; Tombesi, Paolo
1993-01-01
The quantum non-demolition measurement of the cyclotron excitations of an electron confined in a Penning trap could be obtained by measuring the resonance frequency of the axial motion, which is coupled to the cyclotron motion through the relativistic shift of the electron mass.
Code of Federal Regulations, 2014 CFR
2014-07-01
... GREENHOUSE GAS REPORTING Industrial Waste Landfills § 98.468 Definitions. Except as provided below, all terms... and demolition (C&D) waste landfill means a solid waste disposal facility subject to the requirements of subparts A or B of part 257 of this chapter that receives construction and demolition waste and...
77 FR 49722 - Cranes and Derricks in Construction: Demolition and Underground Construction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-17
... cranes rule, OSHA prepared a final economic analysis (FEA) as required by the Occupational Safety and... construction work involving demolition. The FEA for the final cranes standard, which included all cranes, crane... were technologically and economically feasible. Because the FEA drew these conclusions from...
A&M. Outdoor turntable. Workings and design exposed during demolition. View ...
A&M. Outdoor turntable. Workings and design exposed during demolition. View between two of the four rails of the track. Note motor and electrical conduit. Date: February 3, 2003. INEEL negative no. HD-37-1-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
48 CFR 46.313 - Contracts for dismantling, demolition, or removal of improvements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contracts for dismantling, demolition, or removal of improvements. 46.313 Section 46.313 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.313 Contracts for dismantling...
ASBESTOS RELEASE FROM THE DEMOLITION OF TWO SCHOOLS IN FAIRBANKS, ALASKA
Two elementary schools on Fort Wainwright Army Base in Fairbanks, Alaska were demolished during the Summer of 1992. rior to demolition, all friable asbestos was removed from the buildings in accordance with the applicable U.S. EPA's asbestos NESHAP. he primary objective of the st...
126. DETAIL OF NORTH PLANT AMMUNITION DEMOLITION FACILITY, WITH ASSEMBLY ...
126. DETAIL OF NORTH PLANT AMMUNITION DEMOLITION FACILITY, WITH ASSEMBLY PLANT/WAREHOUSE (BUILDING 1601/1606/1701) IN BACKGROUND, FROM GB MANUFACTURING PLANT. VIEW TO NORTHWEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO
125. NORTH PLANT AMMUNITION DEMOLITION FACILITY IN FOREGROUND AND ASSEMBLY ...
125. NORTH PLANT AMMUNITION DEMOLITION FACILITY IN FOREGROUND AND ASSEMBLY PLANT/WAREHOUSE (BUILDING 1601/1606/1701) IN BACKGROUND. FROM GB MANUFACTURING PLANT. VIEW TO NORTHWEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO
DOT National Transportation Integrated Search
2016-09-29
This project piloted the findings from an initial research and development project pertaining to the detection, : quantification, and visualization of bridge deck distresses through the use of remote sensing techniques, specifically : combining optic...
DOT National Transportation Integrated Search
2009-03-01
This project was an implementation of research conducted under TxDOT Research Project 0-4124 on the use : of post-installed shear connectors to develop composite action in existing non-composite steel bridge girder : systems. In this implementation s...
Quantum non-demolition detection of an itinerant microwave photon
NASA Astrophysics Data System (ADS)
Kono, S.; Koshino, K.; Tabuchi, Y.; Noguchi, A.; Nakamura, Y.
2018-06-01
Photon detectors are an elementary tool to measure electromagnetic waves at the quantum limit1,2 and are heavily demanded in the emerging quantum technologies such as communication3, sensing4 and computing5. Of particular interest is a quantum non-demolition (QND)-type detector, which projects an electromagnetic wave onto the photon-number basis6-10. This is in stark contrast to conventional photon detectors2 that absorb a photon to trigger a `click'. The long-sought QND detection of a flying photon was recently demonstrated in the optical domain using a single atom in a cavity11,12. However, the counterpart for microwaves has been elusive despite the recent progress in microwave quantum optics using superconducting circuits13-19. Here, we implement a deterministic entangling gate between a superconducting qubit and an itinerant microwave photon reflected by a cavity containing the qubit. Using the entanglement and the high-fidelity qubit readout, we demonstrate a QND detection of a single photon with the quantum efficiency of 0.84 and the photon survival probability of 0.87. Our scheme can serve as a building block for quantum networks connecting distant qubit modules as well as a microwave-photon-counting device for multiple-photon signals.
C D debris: Construction and dismantling
DOE Office of Scientific and Technical Information (OSTI.GOV)
Woods, R.
1994-04-01
After years of sophisticated recycling efforts in the field of construction and demolition (C D) debris cleanup, today's construction sites are beginning to show signs of a change in philosophy: Today's lumber scraps and concrete rubble are tomorrow's raw materials. With this transformation from refuse to resource, the image of the wrecking ball sending concrete, metal, roofing material, and drywall cascading as one into a twisted heap on the ground may soon become a thing of the past. While the wrecking ball will still be there at many sites, the piles of C D it produces are getting cleaner andmore » more homogeneous -- a crucial factor in the marketing success of any commodity. As the bulky nature of the material elicits more landfill bans each year and tip fees continue to climb, many new building projects are placing a greater emphasis on C D debris reuse and recycling, beginning with the bid specification itself. Along with all the other details in the construction or demolition contract, it is becoming popular to include assessment of what C D materials will be produced and to list in the specification package, up front, the planned end uses for the materials before the first sledgehammer falls.« less
Study on the Old Girders in the Widening Hollow Slab Girder Bridge
NASA Astrophysics Data System (ADS)
Wang, Ying; Zhang, Li Fang; Ma, Hai Yan
2018-06-01
Taking the bridge widening project of Shanghai-Hangzhou-Ningbo expressway widening construction project (China) as the background in this paper, the variation law of the internal force of the old bridge in the widening hollow slab girder bridge under vehicle load is studied, which is under the condition of different span lengths and different widening widths. Three different span lengths of the pre-tensioned prestressed hollow slab girder bridges are selected, the spatial finite element models of both the old bridge and the whole structure of widening bridge are established and calculated respectively by Midas/Civil software. The influences of widening and load increasing on the old bridges under the vehicle load are compared and analyzed. In addition, the authors also analyze the influences of different widening widths on the force state of old bridges under the condition of widening the same number of lane. Moreover , the effects on the old bridges that are caused by the uneven foundation settlement of widening bridge structure are also studied in this paper. This paper can provide some references for widening design of hollow slab bridges.
23 CFR 661.39 - How are project cost overruns funded?
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false How are project cost overruns funded? 661.39 Section 661... OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.39 How are project cost overruns funded? (a) A request for additional IRRBP funds for cost overruns on a specific bridge project must be submitted to...
23 CFR 661.39 - How are project cost overruns funded?
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false How are project cost overruns funded? 661.39 Section 661... OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.39 How are project cost overruns funded? (a) A request for additional IRRBP funds for cost overruns on a specific bridge project must be submitted to...
23 CFR 661.39 - How are project cost overruns funded?
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false How are project cost overruns funded? 661.39 Section 661... OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.39 How are project cost overruns funded? (a) A request for additional IRRBP funds for cost overruns on a specific bridge project must be submitted to...
23 CFR 661.39 - How are project cost overruns funded?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false How are project cost overruns funded? 661.39 Section 661... OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.39 How are project cost overruns funded? (a) A request for additional IRRBP funds for cost overruns on a specific bridge project must be submitted to...
23 CFR 661.39 - How are project cost overruns funded?
Code of Federal Regulations, 2010 CFR
2010-04-01
... OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.39 How are project cost overruns funded? (a) A request for additional IRRBP funds for cost overruns on a specific bridge project must be submitted to... 23 Highways 1 2010-04-01 2010-04-01 false How are project cost overruns funded? 661.39 Section 661...
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. -- Launch Umbilical Tower No. 1 (LUT- 1), stored in the Industrial Area of KSC, is being demolished using a Caterpillar excavator and 48-inch shear attachment. Seen is the base of tower; the upright tower extended more than 398 feet above the launch pad. The LUT-1 was part of the launch system used for Apollo-Saturn V, launching Apollo 8, Apollo 11, Skylab manned missions and the Apollo-Soyuz Test Project. The shear being used for demolition is one used in the deconstruction of the Twin Towers in New York City after 9/11.
Joint Remote State Preparation Schemes for Two Different Quantum States Selectively
NASA Astrophysics Data System (ADS)
Shi, Jin
2018-05-01
The scheme for joint remote state preparation of two different one-qubit states according to requirement is proposed by using one four-dimensional spatial-mode-entangled KLM state as quantum channel. The scheme for joint remote state preparation of two different two-qubit states according to requirement is also proposed by using one four-dimensional spatial-mode-entangled KLM state and one three-dimensional spatial-mode-entangled GHZ state as quantum channels. Quantum non-demolition measurement, Hadamard gate operation, projective measurement and unitary transformation are included in the schemes.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false How will a bridge project be programmed for funding once eligibility has been determined? 661.23 Section 661.23 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false How will a bridge project be programmed for funding once eligibility has been determined? 661.23 Section 661.23 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false How will a bridge project be programmed for funding once eligibility has been determined? 661.23 Section 661.23 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a...
Evaluation of the need for longitudinal median joints in bridge decks on dual structures.
DOT National Transportation Integrated Search
2015-09-01
The primary objective of this project was to determine the effect of bridge width on deck cracking in bridges. Other parameters, : such as bridge skew, girder spacing and type, abutment type, pier type, and number of bridge spans, were also studied. ...
DOT National Transportation Integrated Search
1995-08-01
Bridge design engineers and local highway officials make bridge replacement decisions across the : United States. The Analytical Hierarchy Process was used to characterize the bridge material selection : decision of these individuals. State Departmen...
77 FR 49741 - Cranes and Derricks in Construction: Demolition and Underground Construction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-17
... Analysis When it issued the final cranes rule, OSHA prepared a final economic analysis (FEA) as required by... construction and cranes engaged in construction work involving demolition. The FEA for the final cranes..., found that the requirements of the rule were technologically and economically feasible. Because the FEA...
This report, Methodology to Estimate the Quantity, Composition and Management of Construction and Demolition Debris in the US, was developed to expand access to data on CDD in the US and to support research on CDD and sustainable materials management. Since past US EPA CDD estima...
Increased residential demolitions have made vacant lots a ubiquitous feature of the contemporary urban landscape. Vacant lots may provide ecosystem services such as stormwater runoff capture, but the extent of these functions will be regulated by soil hydrology. We evaluated soil...
The Asbestos NESHAP (National Emission Standard for Hazardous Air Pollutants) requires the removal of all Regulated Asbestos-Containing Material (RACM) prior to the demolition of the buildings that fall under the auspices of the NESHAP. This removal process can be a costly and ti...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zakaria, M.; Cabrera, J.G.
1996-12-31
Demolition aggregates and artificial aggregates made with waste materials are two alternatives being studied for replacement of natural aggregates in the production of concrete. Natural aggregate sources in Europe are increasingly scarce and subject to restrictions based on environmental regulations. In many areas of the developing world sources of good quality aggregates are very limited or practically not available and therefore it has become necessary to study alternative materials. This paper presents a laboratory study on the use of demolition bricks and artificial aggregates made from fly ash-clay as coarse aggregates to make concrete. The concretes made either with demolitionmore » bricks or artificial aggregates are compared with a control mix made with natural gravel aggregates. The strength and durability characteristics of these concretes are evaluated using as a criteria compressive strength and transport properties, such as gas and water permeability. The results show clearly that concretes of good performance and durability can be produced using aggregates from demolition rubble or using artificial aggregates made with wastes such as fly ash.« less
Bridge deterioration models to support Indiana's bridge management system.
DOT National Transportation Integrated Search
2016-02-01
An effective bridge management system that is equipped with reliable deterioration models enables agency engineers to carry out : monitoring and long-term programming of bridge repair actions. At the project level, deterioration models help the agenc...
Strategy of Construction and Demolition Waste Management after Chemical Industry Facilities Removal
NASA Astrophysics Data System (ADS)
Tashkinova, I. N.; Batrakova, G. M.; Vaisman, Ya I.
2017-06-01
Mixed waste products are generated in the process of irrelevant industrial projects’ removal if conventional techniques of their demolition and dismantling are applied. In Russia the number of unused chemical industry facilities including structures with high rate of wear is growing. In removing industrial buildings and production shops it is used conventional techniques of demolition and dismantling in the process of which mixed waste products are generated. The presence of hazardous chemicals in these wastes makes difficulties for their use and leads to the increasing volume of unutilized residues. In the process of chemical industry facilities’ removal this fact takes on special significance as a high level of hazardous chemicals in the waste composition demands for the realization of unprofitable measures aimed at ensuring environmental and industrial safety. The proposed strategy of managing waste originated from the demolition and dismantling of chemical industry facilities is based on the methodology of industrial metabolism which allows identifying separate material flows of recycled, harmful and ballast components, performing separate collection of components during removal and taking necessary preventive measures. This strategy has been tested on the aniline synthesis plant being in the process of removal. As a result, a flow of 10 wt. %, subjected to decontamination, was isolated from the total volume of construction and demolition waste (C&D waste). The considered approach allowed using the resource potential of more than 80wt. % of waste and minimizing the disposed waste volume.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kehler, Kurt
Since the start of its contract in 2008, the CH2M Hill Plateau Remediation Company (CH2M HILL) has demolished 25 buildings with concrete asbestos board (CAB) siding using mechanical means. While the asbestos contained in CAB siding is not friable in its manufactured form, concerns persist that mechanical methods of demolition have the potential to render the asbestos friable and airborne, therefore posing a health risk to demolition workers and the public. CH2M HILL's experience demonstrates that when carefully managed, mechanical demolition of CAB siding can be undertaken safely, successfully, and in compliance with regulatory requirements for the disposal of Classmore » II Asbestos-Containing Material (ACM). While the number of buildings demolished at Hanford and the number of samples collected does not make a conclusive argument that CAB cannot be made friable with normal demolition techniques, it certainly provides a significant body of evidence for the success of the approach. Of course, there are many factors that affect how to demolish a structure and dispose of the waste. These factors will impact the success depending on each site. The most obvious factors which contribute to this success at Hanford are: 1. The availability of onsite waste disposal where the handling and cost of asbestos-containing waste is not much different than other potentially contaminated waste. Therefore, segregation of demolition debris from the potential asbestos contamination is not necessary from a debris handling or asbestos disposal aspect. 2. The space between structures is typically significant enough to allow for large exclusion zones. There are not many restrictions due to cohabitation issues or potential contamination of adjacent facilities. 3. The willingness of the regulators and client to understand the industrial safety issues associated with manual CAB removal. (authors)« less
Di Maria, Andrea; Eyckmans, Johan; Van Acker, Karel
2018-05-01
Urgent solutions are needed in Europe to deal with construction and demolition waste (CDW). EU policy has contributed to significantly reducing the amount of CDW going to landfill, but most of the effort has been put in downcycling practices. Therefore, further policies are needed to stimulate high-quality recycling of CDW. The present paper presents a combined life cycle assessment (LCA) and life cycle costing (LCC) methodologies to analyse the environmental and the economic drivers in four alternative CDW end-of-life scenarios in the region of Flanders, in Belgium. The four analysed alternatives are (i) landfilling, (ii) downcycling, (iii) advanced recycling and (iv) recycling after selective demolition. LCA results show that landiflling is the scenario having the highest environmental impacts in terms of person equivalent (PE), followed by downcycling and recycling (-36%) and recycling after selective demolition (-59%). The decrease in environmental impacts is mostly due to the avoided landfilling of CDW and the recovery of materials from selective demolition. LCC results indicate that landfilling is the scenario bearing the highest total economic costs. This is due to the high landfill tax in Flanders. The recycling after selective demolition bears the second highest cost. The increase of high-quality CDW recycling can significantly reduce the overall environmental impact of the system. Implementing a high landfill tax, increasing the gate fee to the recycling plant, and boosting the sales price of recycled aggregates are the most effective drivers to facilitate a transition towards a more sustainable CDW management system. The paper demonstrates that the combined LCA and LCC results can highlight the environmental and economic drivers in CDW management. The results of the combined analysis can help policymakers to promote the aspects contributing to sustainability and to limit the ones creating a barrier. Copyright © 2018 Elsevier Ltd. All rights reserved.
DOT National Transportation Integrated Search
2008-01-01
The objective of this research was to implement and evaluate a fogging system used to provide initial cure for a concrete bridge deck construction project. To accomplish this, Bridges 5500 and 5701 along NM26 were selected. Bridge 5500 was placed usi...
DOT National Transportation Integrated Search
1995-08-01
Bridge design engineers and local highway officials make bridge replacement decsions across the U.S. The Analytical Hierarchical Process was used to characterize the bridge material selection decisions of these individuals. State Departments of Trans...
78 FR 40265 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-03
... on Proposed Bridge Replacement in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT... actions relate to the proposed Mitchell River Bridge (Bridge Street over the Mitchell River) Replacement...). A claim seeking judicial review of the Federal agency actions on the bridge project will be barred...
Geosynthetic reinforced soil for low-volume bridge abutments.
DOT National Transportation Integrated Search
2012-01-01
This report presents a review of literature on geosynthetic reinforced soil (GRS) bridge abutments, and test results and analysis from two : field demonstration projects (Bridge 1 and Bridge 2) conducted in Buchanan County, Iowa, to evaluate the feas...
Evaluation of stainless steel reinforcement construction project
DOT National Transportation Integrated Search
2003-02-01
Stainless steel reinforcement has greater corrosion resistance than that of the conventional reinforcement. In this project, bridge A6059, the first in Missouri utilizing stainless steel reinforcement in the deck, was constructed, along with bridge A...
Experimental maintenance painting on various bridge projects (KH 31)
DOT National Transportation Integrated Search
2002-09-01
The Kentucky Transportation Center (KTC) at the University of Kentucky conducted a research study with the Kentucky Transportation Cabinet (KYTC) to monitor various experimental bridge painting projects. The research study Kentucky Highways Investiga...
Bridge Displacement Monitoring Method Based on Laser Projection-Sensing Technology
Zhao, Xuefeng; Liu, Hao; Yu, Yan; Xu, Xiaodong; Hu, Weitong; Li, Mingchu; Ou, Jingping
2015-01-01
Bridge displacement is the most basic evaluation index of the health status of a bridge structure. The existing measurement methods for bridge displacement basically fail to realize long-term and real-time dynamic monitoring of bridge structures, because of the low degree of automation and the insufficient precision, causing bottlenecks and restriction. To solve this problem, we proposed a bridge displacement monitoring system based on laser projection-sensing technology. First, the laser spot recognition method was studied. Second, the software for the displacement monitoring system was developed. Finally, a series of experiments using this system were conducted, and the results show that such a system has high measurement accuracy and speed. We aim to develop a low-cost, high-accuracy and long-term monitoring method for bridge displacement based on these preliminary efforts. PMID:25871716
Aesthetic bridge rails, transitions, and terminals for park roads and parkways
DOT National Transportation Integrated Search
1990-05-01
The objective of this project was to test aesthetic bridge rails for park roads, parkways, and other roads under Federal jurisdiction. Four designs were analyzed and evaluated: the Modified (Kansas Corral bridge rail, the Forest Service glulam bridge...
Status Report on the Evaluation of the Alternative Asbestos Control Method – A Comparison to the NESHAP Method of Demolition of Asbestos Containing Buildings. This abstract and presentation are based, at least in part, on preliminary data and conclusions. The Alternative Asbestos...
24 CFR 969.107 - HUD approval of demolition or disposition before ACC expiration.
Code of Federal Regulations, 2011 CFR
2011-04-01
... disposition before ACC expiration. 969.107 Section 969.107 Housing and Urban Development REGULATIONS RELATING... HOUSING AFTER COMPLETION OF DEBT SERVICE § 969.107 HUD approval of demolition or disposition before ACC..., HUD may authorize a PHA to demolish or dispose of public housing at any time before the ACC Expiration...
120. NORTH PLANT GB BULK STORAGE BUILDING AND AMMUNITION DEMOLITION ...
120. NORTH PLANT GB BULK STORAGE BUILDING AND AMMUNITION DEMOLITION FACILITY AT CENTER AND CASE FILLING PLANT/CLUSTER ASSEMBLY BUILDING (BUILDING 1601/1606) IN BACKGROUND, FROM GB MANUFACTURING PLANT. VIEW TO WEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO
Report #15-P-0168, June 16, 2015. Under the EPA's asbestos demolition standard, demolishing buildings that are structurally unsound and in imminent danger of collapse can release enough asbestos into the environment to pose a potential risk to human health
Delton Alderman; Robert Smith; Philip A. Araman
2003-01-01
This research developed a profile of used chromated copper arsenate (CCA) lumber removed from the demolition of residential decking. This was achieved by gathering and compiling information regarding the construction, demolition, deck remodeling, deck replacement factors, and factors affecting the recovery of spent CCA lumber. In addition, qualitative responses...
The report presents an evaluation of construction and demolition (C&D) debris management in the US to update and expand upon the previous set of data to include information on more recent cases of damage and potential impacts and expand the breadth of damages beyond groundwater a...
ERIC Educational Resources Information Center
Netzer, Greg
1995-01-01
Discusses a model water quality monitoring project, Project Bridge, established to train minority girls about to enter eighth grade in scientific procedures followed by hands-on experimentation. Students spent a week monitoring water in an urban stream and analyzing results. (LZ)
Strengthening bridges using composite materials.
DOT National Transportation Integrated Search
1998-03-01
The objective of this research project is to outline methodologies for using Fiber Reinforced Polymer (FRP) composites to strengthen and rehabilitate reinforced concrete bridge elements. : Infrastructure deterioration and bridge strengthening techniq...
Laboratory investigation of grouted coupler connection details for ABC bridge projects.
DOT National Transportation Integrated Search
2015-08-01
With an ever increasing desire to utilize accelerated bridge construction (ABC) techniques, it is becoming critical that bridge : designers and contractors have confidence in typical details. The Keg Creek Bridge on US 6 in Iowa was a recent ABC exam...
Dynamic testing of the T223 bridge rail.
DOT National Transportation Integrated Search
2009-09-01
The TxDOT T203 bridge rail is often used on bridges where asphalt overlays reduce the effective : height of the bridge rail. This reduction in height due to asphalt paving overlay is undesirable. For this : project, several geometric features were ch...
Evaluation of design methods to determine scour depths for bridge structures.
DOT National Transportation Integrated Search
2013-03-01
Scour of bridge foundations is the most common cause of bridge failures. The overall goal of this project was to evaluate the applicability of the existing Hydraulic Engineering Circular (HEC-18) documents method to Louisiana bridges that are mostly ...
Development of a sustainable UHPC bridge deck for movable bridges : [research project capsule].
DOT National Transportation Integrated Search
2015-11-01
Louisiana has approximately 160 movable bridges, mostly in the southern part of the state, which : places Louisiana among states with the highest inventory of movable bridges in the nation. These : transportation arteries are important for the econom...
DOT National Transportation Integrated Search
2000-01-01
A bridge rehabilitation utilizing a hybrid fiber reinforced polymeric composite has been completed in Blacksburg, Virginia. This project involved replacing the superstructure in the Tom's Creek Bridge, a rural short-span traffic bridge with a timber ...
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects
DOT National Transportation Integrated Search
1996-01-01
These standard specifications were issued primarily for constructing roads and bridges on Federal Highway projects under the direct administration of the Federal Highway Administration. These specifications are cited as "FP-96" indicating Standard Sp...
DOT National Transportation Integrated Search
2002-02-01
The Kentucky Transportation Center (KTC) at the University of Kentucky has performed a series of research studies for the Kentucky Transportation Cabinet (KYTC) to monitor various experimental bridge painting projects and conduct investigative work f...
76 FR 1663 - Notice of Final Federal Agency Actions on Proposed Highway in North Carolina
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-11
..., Bonner Bridge Replacement Project along NC 12, from Rodanthe to Bodie Island in Dare County, North... Bonner Bridge Replacement Project along Highway NC 12, from Rodanthe to Bodie Island, in Dare County...
Remote sensing for bridge scour projects : final report, July 31, 2009.
DOT National Transportation Integrated Search
2009-07-31
large percentage of bridges within the state of Pennsylvania are located over waterways. For such bridges, much of the supporting structure is positioned within the river or stream bed of the waterway. As a result, these bridges are susceptible to br...
Learning Based on the Project Entitled "Design and Construction of a Wooden Bridge"
ERIC Educational Resources Information Center
Barris, Cristina; Torres, Lluís; Simon, Enric
2016-01-01
This article presents the results of a case involving the application of project-based learning carried out with students in the Mechanical Engineering degree program at the University of Girona. The project, entitled "Design and construction of a wooden bridge", was conducted at the Polytechnic School in the third-year Structures…
Robert L. Smith; Robert J. Bush; Daniel L. Schmoldt
1995-01-01
Bridge design engineers and local highway officials make bridge replacement decisions across the United States. The Analytical Hierarchy Process was used to characterize the bridge material selection decision of these individuals. State Department of Transportation engineers, private consulting engineers, and local highway officials were personally interviewed in...
Research notes : soil nailing of a bridge fill embankment.
DOT National Transportation Integrated Search
1991-11-01
A recent construction project involved widening and lowering the grade of the Swift Highway under the south end of the Oregon Slough Bridge approximately seven miles north of Portland. This project included construction of the first permanent soil na...
DOT National Transportation Integrated Search
2003-03-01
The Kentucky Transportation Center (KTC) at the University of Kentucky has performed a series of research studies for the Kentucky Transportation Cabinet (KYTC) to monitor various experimental bridge painting projects and conduct investigative work f...
DOT National Transportation Integrated Search
2015-12-01
Externally bonded carbon fiber reinforced polymer composites (CFRPs) are increasingly used to : repair concrete bridges. CFRP design techniques are a proven approach for enhancing the strength : of existing structures. This project investigated the d...
PCP cracking and bridge deck reinforcement : an interim report.
DOT National Transportation Integrated Search
2010-10-28
TxDOT Project 0-6348 Controlling Cracking in Prestressed Concrete Panels and Optimizing Bridge Deck : Reinforcing Steel started on September 1, 2008 and is scheduled to end on August 31, 2012. The project is : proceeding on schedule. This repor...
Field measurements on skewed semi-integral bridge with elastic inclusion : instrumentation report.
DOT National Transportation Integrated Search
2006-01-01
This project was designed to enhance the Virginia Department of Transportation's expertise in the design of integral bridges, particularly as it applies to highly skewed structures. Specifically, the project involves extensive monitoring of a semi-in...
Longitudinal cracking in concrete at bridge deck dams on structural rehabilitation projects.
DOT National Transportation Integrated Search
2012-10-01
The main objective of this project was to identify the causes of longitudinal cracking in newly placed concrete deck segments adjacent to : bridge deck expansion dam rehabilitations within District 3-0 of the Pennsylvania Department of Transportation...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sushkov, Y.V.; Borulev, A.D.; Yakovlev, N.A.
1986-05-01
The authors consider the problems of modeling the process of collapse of extended mine workings on plane models. Their derivation has been effected on the basis of the model of the ground and criteria of its demolition. It is assumed that in order to ensure similarity of crushing, equality of the amount of fissures developed in the natural state and the model is necessary. An analysis of the dependence of the average size of a ''lump'' in the demolition zone on the magnitude of the maximum stress in the wave, carried out by the method of least squares, showed thatmore » it can be represented quite well in the form of two intersecting straight lines.« less
Rapid construction of Pacific Street Bridge with o.7 inch strands.
DOT National Transportation Integrated Search
2010-10-01
The Pacific Street Bridge over I-680 in Omaha, NE is the first bridge in the United States to use 0.7-in.-diameter prestressing : strands in pretensioned concrete girders. This project was funded by FHWA through NDOR under the Innovative Bridge Resea...
View of Flume Bridge #4 showing flume and trestles. Looking ...
View of Flume Bridge #4 showing flume and trestles. Looking northeast - Childs-Irving Hydroelectric Project, Childs System, Flume Bridge No. 4, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ
Rapid and Reliable Damage Proxy Map from InSAR Coherence
NASA Technical Reports Server (NTRS)
Yun, Sang-Ho; Fielding, Eric; Simons, Mark; Agram, Piyush; Rosen, Paul; Owen, Susan; Webb, Frank
2012-01-01
Future radar satellites will visit SoCal within a day after a disaster event. Data acquisition latency in 2015-2020 is 8 to approx. 15 hours. Data transfer latency that often involves human/agency intervention far exceeds the data acquisition latency. Need interagency cooperation to establish automatic pipeline for data transfer. The algorithm is tested with ALOS PALSAR data of Pasadena, California. Quantitative quality assessment is being pursued: Meeting with Pasadena City Hall computer engineers for a complete list of demolition/construction project 1. Estimate the probability of detection and probability of false alarm 2. Estimate the optimal threshold value.
Enhancement of the FDOT's project level and network level bridge management analysis tools
DOT National Transportation Integrated Search
2011-02-01
Over several years, the Florida Department of Transportation (FDOT) has been implementing the AASHTO Pontis Bridge Management System to support network-level and project-level decision making in the headquarters and district offices. Pontis is an int...
Distribution factors for construction loads and girder capacity equations [project summary].
DOT National Transportation Integrated Search
2017-03-01
This project focused on the use of Florida I-beams (FIBs) in bridge construction. University of Florida researchers used analytical models and finite element analysis to update equations used in the design of bridges using FIBs. They were particularl...
Research notes : solar powered navigational lighting system demonstration project.
DOT National Transportation Integrated Search
2011-04-01
ODOT will be installing a solar powered navigational lighting system on the AstoriaMegler Bridge as part of a pilot project approved by the Federal Highways Administration (FHWA). The coastal bridge is the connection across the Columbia River on U.S....
Muianga, Custodio; Rice, Carol; Lentz, Thomas; Lockey, James; Niemeier, Richard; Succop, Paul
2012-01-01
A systematic approach was developed to review, revise and adapt existing exposure control guidance used in developed countries for use in developing countries. One-page employee and multiple-page supervisor guidance sheets were adapted from existing documents using a logic framework and workers were trained to use the information to improve work practices. Interactive, hands-on training was delivered to 26 workers at five small-scale demolition projects in Maputo City, Mozambique, and evaluated. A pre-and-post walkthrough survey used by trained observers documented work practice changes. Worker feedback indicated that the training was effective and useful. Workers acquired knowledge (84% increase, p < 0.01) and applied the work practice guidance. The difference of proportions between use of work practice components before and after the intervention was statistically significant (p < 0.05). Changes in work practices following training included preplanning, use of wet methods and natural ventilation and end-of-task review. Respirable dust measurements indicated a reduction in exposure following training. Consistency in observer ratings and observations support the reliability and validity of the instruments. This approach demonstrated the short-term benefit of training in changing work practices; follow-up is required to determine the long-term impact on changes in work practices, and to evaluate the need for refresher training. PMID:22470296
A web-based Decision Support System for the optimal management of construction and demolition waste.
Banias, G; Achillas, Ch; Vlachokostas, Ch; Moussiopoulos, N; Papaioannou, I
2011-12-01
Wastes from construction activities constitute nowadays the largest by quantity fraction of solid wastes in urban areas. In addition, it is widely accepted that the particular waste stream contains hazardous materials, such as insulating materials, plastic frames of doors, windows, etc. Their uncontrolled disposal result to long-term pollution costs, resource overuse and wasted energy. Within the framework of the DEWAM project, a web-based Decision Support System (DSS) application - namely DeconRCM - has been developed, aiming towards the identification of the optimal construction and demolition waste (CDW) management strategy that minimises end-of-life costs and maximises the recovery of salvaged building materials. This paper addresses both technical and functional structure of the developed web-based application. The web-based DSS provides an accurate estimation of the generated CDW quantities of twenty-one different waste streams (e.g. concrete, bricks, glass, etc.) for four different types of buildings (residential, office, commercial and industrial). With the use of mathematical programming, the DeconRCM provides also the user with the optimal end-of-life management alternative, taking into consideration both economic and environmental criteria. The DSS's capabilities are illustrated through a real world case study of a typical five floor apartment building in Thessaloniki, Greece. Copyright © 2011 Elsevier Ltd. All rights reserved.
DOT National Transportation Integrated Search
2009-10-01
This report presents the use of externally bonded fiber reinforced polymers (FRP) laminates for the flexural strengthening of a : concrete bridge. The bridge selected for this project is a two-span simply supported reinforced concrete slab with no tr...
DOT National Transportation Integrated Search
2014-07-01
The purpose of this report is to document Accelerated Bridge Construction (ABC) techniques on IBRD : (Innovative Bridge Research and Development) project 102470 for the construction of Bridge N-16-Q : on State Highway 69 over Turkey Creek. The constr...
DOT National Transportation Integrated Search
2011-07-01
There are 16 small to medium simple span bridges in Larimer County, Colorado that are currently load rated solely based on visual inspections. Most of these bridges are prestressed concrete bridges. The objective of this project is to load rate these...
78 FR 61937 - Safety Zone; Port of Galveston, Pelican Island Bridge Repair
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-07
... Zone; Port of Galveston, Pelican Island Bridge Repair AGENCY: Coast Guard, DHS. ACTION: Temporary final... safety during the Pelican Island Bridge Repair Project. This action is necessary to protect public... barge will be placed under the Pelican Island Bridge; therefore immediate action is needed to protect...
Design and Implementation of a New System for Large Bridge Monitoring—GeoSHM
Xie, Yilin; Ince, Sean; Ye, Jun; Bhatia, Paul
2018-01-01
Structural Health Monitoring (SHM) is a relatively new branch of civil engineering that focuses on assessing the health status of infrastructure, such as long-span bridges. Using a broad range of in-situ monitoring instruments, the purpose of the SHM is to help engineers understand the behaviour of structures, ensuring their structural integrity and the safety of the public. Under the Integrated Applications Promotion (IAP) scheme of the European Space Agency (ESA), a feasibility study (FS) project that used the Global Navigation Satellite Systems (GNSS) and Earth Observation (EO) for Structural Health Monitoring of Long-span Bridges (GeoSHM) was initiated in 2013. The GeoSHM FS Project was led by University of Nottingham and the Forth Road Bridge (Scotland, UK), which is a 2.5 km long suspension bridge across the Firth of Forth connecting Edinburgh and the Northern part of Scotland, was selected as the test structure for the GeoSHM FS project. Initial results have shown the significant potential of the GNSS and EO technologies. With these successes, the FS project was further extended to the demonstration stage, which is called the GeoSHM Demo project where two other long-span bridges in China were included as test structures. Led by UbiPOS UK Ltd. (Nottingham, UK), a Nottingham Hi-tech company, this stage focuses on addressing limitations identified during the feasibility study and developing an innovative data strategy to process, store, and interpret monitoring data. This paper will present an overview of the motivation and challenges of the GeoSHM Demo Project, a description of the software and hardware architecture and a discussion of some primary results that were obtained in the last three years. PMID:29510534
View of Flume Bridge #5 from FS 502 looking downstream ...
View of Flume Bridge #5 from FS 502 looking downstream (south). Bridge is on the left side of the photograph. This is similar to other flume bridges in the system and is the only photograph representing these features. - Childs-Irving Hydroelectric Project, Childs System, Flume Bridge No. 5, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ
33 CFR 165.T11-589 - Safety zone; SFOBB Demolition Safety Zone, San Francisco, CA.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Guard District § 165.T11-589 Safety zone; SFOBB Demolition Safety Zone, San Francisco, CA. (a) Location... Safety Zone, San Francisco, CA. 165.T11-589 Section 165.T11-589 Navigation and Navigable Waters COAST... paragraph (a) of this section will be in effect from 6 a.m. to 7 p.m. daily from September 1, 2013 until...
NASA Technical Reports Server (NTRS)
Fortini, Pierluigi; Onofrio, Roberto; Rioli, Alessandro
1993-01-01
A review of current efforts to approach and to surpass the fundamental limit in the sensitivity of the Weber type gravitational wave antennae is reported. Applications of quantum non-demolition techniques to the concrete example of an antenna resonant with the transducer are discussed in detail. Analogies and differences from the framework of the squeezed states in quantum optics are discussed.
Environmental impacts of bridge cleaning operations.
DOT National Transportation Integrated Search
2003-02-01
Cleaning (washing) operations of existing leaded paints on bridges were studied to determine the level of lead contamination in the resulting wastewater. Twelve experimental overcoating projects were let on bridges with various types of existing pain...
GRS bridge piers and abutments.
DOT National Transportation Integrated Search
2001-01-01
This report presents the following three recent projects on load testing of geosynthetic-reinforced soil (GRS) bridge abutments and piers: a full-scale bridge pier load test conducted by the Turner-Fairbank Highway Research Center, Federal Highway Ad...
View of Steel Flume Bridge #2 crossing over wash. Looking ...
View of Steel Flume Bridge #2 crossing over wash. Looking downstream, southwest - Childs-Irving Hydroelectric Project, Childs System, Flume Bridge No. 2, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ
View of Steel Flume Bridge #3 crossing over Sally May ...
View of Steel Flume Bridge #3 crossing over Sally May Wash. Looking northwest - Childs-Irving Hydroelectric Project, Childs System, Flume Bridge No. 3, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ
Closeup view of Flume Bridge #4 showing structural components. Looking ...
Close-up view of Flume Bridge #4 showing structural components. Looking northeast - Childs-Irving Hydroelectric Project, Childs System, Flume Bridge No. 4, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ
Accelerating bridge construction to minimize traffic disruption : research spotlight.
DOT National Transportation Integrated Search
2013-12-01
Since 2008, MDOT has been using accelerated bridge construction, which utilizes prefabricated components and structural placements, to minimize traffic disruptions during bridge replacement or rehabilitation. A recent project provided MDOT with a new...
Translating Climate Projections for Bridge Engineering
NASA Astrophysics Data System (ADS)
Anderson, C.; Takle, E. S.; Krajewski, W.; Mantilla, R.; Quintero, F.
2015-12-01
A bridge vulnerability pilot study was conducted by Iowa Department of Transportation (IADOT) as one of nineteen pilots supported by the Federal Highway Administration Climate Change Resilience Pilots. Our pilot study team consisted of the IADOT senior bridge engineer who is the preliminary design section leader as well as climate and hydrological scientists. The pilot project culminated in a visual graphic designed by the bridge engineer (Figure 1), and an evaluation framework for bridge engineering design. The framework has four stages. The first two stages evaluate the spatial and temporal resolution needed in climate projection data in order to be suitable for input to a hydrology model. The framework separates streamflow simulation error into errors from the streamflow model and from the coarseness of input weather data series. In the final two stages, the framework evaluates credibility of climate projection streamflow simulations. Using an empirically downscaled data set, projection streamflow is generated. Error is computed in two time frames: the training period of the empirical downscaling methodology, and an out-of-sample period. If large errors in projection streamflow were observed during the training period, it would indicate low accuracy and, therefore, low credibility. If large errors in streamflow were observed during the out-of-sample period, it would mean the approach may not include some causes of change and, therefore, the climate projections would have limited credibility for setting expectations for changes. We address uncertainty with confidence intervals on quantiles of streamflow discharge. The results show the 95% confidence intervals have significant overlap. Nevertheless, the use of confidence intervals enabled engineering judgement. In our discussions, we noted the consistency in direction of change across basins, though the flood mechanism was different across basins, and the high bound of bridge lifetime period quantiles exceeded that of the historical period. This suggested the change was not isolated, and it systemically altered the risk profile. One suggestion to incorporate engineering judgement was to consider degrees of vulnerability using the median discharge of the historical period and the upper bound discharge for the bridge lifetime period.
Completion of the decommissioning of a former active handling building at UKAEA Winfrith
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, N.; Parkinson, S.J.; Cornell, R.M.
2007-07-01
Since July 2000, NUKEM Limited has been carrying out the full decommissioning of a former Active Handling Building A59 at Winfrith in Dorset under contract from the nuclear site licence holder, UKAEA. Work has generally centred upon clearance and decontamination of the two heavily shielded suites of caves originally used to carry out remote examination of irradiated nuclear fuel elements although a number of other supporting facilities are also involved. This work has proceeded successfully to completion following extensive decontamination of the caves and associated facilities and has been followed by the recent demolition of the main containment building structure.more » This has permitted a start to be made on the demolition of the two heavily shielded suites of caves which is to be followed by removal of the building slab and restoration of the site. This paper reviews some of the significant tasks undertaken during the past year in preparation for the building and cave line demolition operations. It also reviews the building structure removal and recent progress made with the demolition of the two heavily reinforced concrete cave lines. The procedure used for monitoring the concrete debris from the cave lines has had to be revised during these operations and the reasons for this and a temporary delay in the cave line demolition will be discussed in the context of the remaining sections of the programme. This decommissioning programme has been achieved throughout by the employment of a non-adversarial team working approach between client and contractor. This has been instrumental in developing cost-effective and safe solutions to a range of problems during the programme, demonstrating the worth of adopting this co-operative approach for mutual benefit. (authors)« less
Construction and demolition waste indicators.
Mália, Miguel; de Brito, Jorge; Pinheiro, Manuel Duarte; Bravo, Miguel
2013-03-01
The construction industry is one of the biggest and most active sectors of the European Union (EU), consuming more raw materials and energy than any other economic activity. Furthermore, construction waste is the commonest waste produced in the EU. Current EU legislation sets out to implement construction and demolition waste (CDW) prevention and recycling measures. However it lacks tools to accelerate the development of a sector as bound by tradition as the building industry. The main objective of the present study was to determine indicators to estimate the amount of CDW generated on site both globally and by waste stream. CDW generation was estimated for six specific sectors: new residential construction, new non-residential construction, residential demolition, non-residential demolition, residential refurbishment, and non-residential refurbishment. The data needed to develop the indicators was collected through an exhaustive survey of previous international studies. The indicators determined suggest that the average composition of waste generated on site is mostly concrete and ceramic materials. Specifically for new residential and new non-residential construction the production of concrete waste in buildings with a reinforced concrete structure lies between 17.8 and 32.9 kg m(-2) and between 18.3 and 40.1 kg m(-2), respectively. For the residential and non-residential demolition sectors the production of this waste stream in buildings with a reinforced concrete structure varies from 492 to 840 kg m(-2) and from 401 to 768 kg/m(-2), respectively. For the residential and non-residential refurbishment sectors the production of concrete waste in buildings lies between 18.9 and 45.9 kg/m(-2) and between 18.9 and 191.2 kg/m(-2), respectively.
Bridge inspection / washing program : bridge drainage program
DOT National Transportation Integrated Search
2002-02-01
The Rhode Island Department of Transportation, Operations Division is responsible for operation and maintenance of roads and bridges, and construction of highway and multi-modal projects to improve the transportation system of our state. One of the m...
Performance monitoring of jointless bridges : phase III.
DOT National Transportation Integrated Search
2014-05-01
Part I: : The third phase of a research project investigating the field performance of jointless bridges is reported. Three : integral abutment bridges in Vermont, US have been instrumented and monitored as part of this research. : General descriptio...
Durability assessment of prefabricated bridge elements and systems : [research summary].
DOT National Transportation Integrated Search
2015-08-01
Many states have instituted Prefabricated Bridge Elements and Systems : (PBES) and Accelerated Bridge Construction (ABC) projects to decrease : onsite construction time, work zone and user costs, and increase safety : factors; however, the quality an...
Low cost structural health monitoring of bridges using wireless SenSpot sensors.
DOT National Transportation Integrated Search
2012-05-01
Deterioration of highway bridges is a common, yet complex problem. To protect highway bridges, this : project combines a number of recent and emerging technologies microstructured sensing, ultra-lowpower : wireless communication, and advanced mic...
Building Bridges between Science Courses Using Honors Organic Chemistry Projects
ERIC Educational Resources Information Center
Hickey, Timothy; Pontrello, Jason
2016-01-01
Introductory undergraduate science courses are traditionally offered as distinct units without formalized student interaction between classes. To bridge science courses, the authors used three Honors Organic Chemistry projects paired with other science courses. The honors students delivered presentations to mainstream organic course students and…
ERIC Educational Resources Information Center
Bisogno, Janet; JeanPierre, Bobby
2008-01-01
The West Point Bridge Design (WPBD) building project engages students in project-based learning by giving them a real-life problem to solve. By using technology, students are able to become involved in solving problems that they normally would not encounter. Involvement with interactive websites, such as WPBD, assists students in using…
DOT National Transportation Integrated Search
2013-08-01
This project demonstrated the capabilities for load testing bridges in Iowa, developed and presented a webinar to local and state engineers, and produced a spreadsheet and benefit evaluation matrix that others can use to preliminarily assess where br...
75 FR 27428 - Safety Standards for Steel Erection
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-17
... in National Highway System construction projects to comply with a number of standards, policies, and...://www.fhwa.dot.gov/bridge/lrfd/index.htm .) For projects involving bridge construction (e.g., temporary... of these requirements will enhance the safety of employees operating on or near structural steel...
DOT National Transportation Integrated Search
2014-11-01
The overall project is to demonstrate the effectiveness of shear spiking (technique alrea : dy developed : through a previous project). Many timber railroad bridges are deficient but i : t is too costly to replace them; : hence : , : inexpensive repa...
List of draft permit & supporting documentation for the Northeast Gateway Energy Bridge Deepwater Port, Federal Waters of Massachusetts Bay (Modification to Existing Permit LNG Regasification Vessel/DWP Project).
Methodology for quantification of waste generated in Spanish railway construction works.
de Guzmán Báez, Ana; Villoria Sáez, Paola; del Río Merino, Mercedes; García Navarro, Justo
2012-05-01
In the last years, the European Union (EU) has been focused on the reduction of construction and demolition (C&D) waste. Specifically, in 2006, Spain generated roughly 47million tons of C&D waste, of which only 13.6% was recycled. This situation has lead to the drawing up of many regulations on C&D waste during the past years forcing EU countries to include new measures for waste prevention and recycling. Among these measures, the mandatory obligation to quantify the C&D waste expected to be originated during a construction project is mandated. However, limited data is available on civil engineering projects. Therefore, the aim of this research study is to improve C&D waste management in railway projects, by developing a model for C&D waste quantification. For this purpose, we develop two equations which estimate in advance the amount, both in weight and volume, of the C&D waste likely to be generated in railway construction projects, including the category of C&D waste generated for the entire project. Copyright © 2012 Elsevier Ltd. All rights reserved.
DOT National Transportation Integrated Search
2013-04-01
To address the need for the development of a fast, repeatable, and dependable way to replace typical bridges across the country, the Transportation Research Board (TRB) developed project R04, Innovative Designs for Rapid Renewal, as part of the...
77 FR 1782 - Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-11
... on Proposed Bridge Replacement in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT... relates to the proposed Fore River Bridge (State Route 3A over the Weymouth Fore River) replacement...(l)(1) by issuing approval for the following bridge project in the Commonwealth of Massachusetts. The...
78 FR 4331 - Safety Zone; Sellwood Bridge Move; Willamette River, Portland, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-22
... 1625-AA00 Safety Zone; Sellwood Bridge Move; Willamette River, Portland, OR AGENCY: Coast Guard, DHS... the Sellwood Bridge, located on the Willamette River in Portland, Oregon, while it is being relocated 66 feet downriver as part of the new Sellwood Bridge construction project. This action is necessary...
NASA Technical Reports Server (NTRS)
Fortini, Pierluigi; Onofrio, Roberto; Rioli, Alessandro
1993-01-01
A review on the current efforts to approach and to surpass the fundamental limit in the sensitivity of the Weber type gravitational wave antennae is reported. Applications of quantum non-demolition techniques to the concrete example of an antenna resonant with the transducer are discussed in detail. Analogies and differences from the framework of the squeezed states in quantum optics are discussed.
2012-11-01
a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE NOV...2012 2. REPORT TYPE 3. DATES COVERED 00-00-2012 to 00-00-2012 4. TITLE AND SUBTITLE Environmental Assessment for Building 104 Demolition Rome...4 C. Earth Resources, Geology and Soils
2005-09-13
in the area, with black mustard, common sowthistle ( Sonchus oleraceus ), iceplant, ripgut brome (Bromus diandrus), bur clover, and foxtail barley...dominant species are Brassica nigra, Sonchus oleraceus , Carpobrotus edulis, Bromus diandrus, Medicago polymorpha and Hordeum murinum. Demolition...multiflorum, Melotis indicus, Plantago coronopus, and Sonchus oleraceus . Survey for birds in interior prior to start of nesting (February), and exclusion if
Commercial Decommissioning at DOE's Rocky Flats
DOE Office of Scientific and Technical Information (OSTI.GOV)
Freiboth, C.; Sandlin, N.; Schubert, A.
2002-02-25
Due in large part to the number of nuclear facilities that make up the DOE complex, DOE-EM work has historically been paperwork intensive and driven by extensive regulations. Requirements for non-nuclear facilities are often grouped with those of nuclear facilities, driving up costs. Kaiser-Hill was interested in applying a commercial model to demolition of these facilities and wanted to apply necessary and sufficient standards to the work activities, but avoid applying unnecessary requirements. Faced with demolishing hundreds of uncontaminated or non-radiologically contaminated facilities, Kaiser-Hill has developed a subcontracting strategy to drastically reduce the cost of demolishing these facilities at Rockymore » Flats. Aiming to tailor the demolition approach of such facilities to more closely follow commercial practices, Kaiser-Hill recently released a Request for Proposals (RFP) for the demolition of the site's former central administration facility. The RFP significantly reduced requirements for compliance with specific DOE directives. Instead, the RFP required subcontractors to comply with health and safety requirements commonly found in the demolition of similar facilities in a commercial setting. This resulted in a number of bids from companies who have normally not bid on DOE work previously and at a reduced cost over previous approaches. This paper will discuss the details of this subcontracting strategy.« less
Distribution of materials in construction and demolition waste in Portugal.
Coelho, André; de Brito, Jorge
2011-08-01
It may not be enough simply to know the global volume of construction and demolition waste (CDW) generated in a certain region or country if one wants to estimate, for instance, the revenue accruing from separating several types of materials from the input entering a given CDW recycling plant. A more detailed determination of the distribution of the materials within the generated CDW is needed and the present paper addresses this issue, distinguishing different buildings and types of operation (new construction, retrofitting and demolition). This has been achieved by measuring the materials from buildings of different ages within the Portuguese building stock, and by using direct data from demolition/retrofitting sites and new construction average values reported in the literature. An attempt to establish a benchmark with other countries is also presented. This knowledge may also benefit industry management, especially that related to CDW recycling, helping to optimize procedures, equipment size and operation and even industrial plant spatial distribution. In an extremely competitive market, where as in Portugal low-tech and high environmental impact procedures remain the norm in the construction industry (in particular, the construction waste industry), the introduction of a successful recycling industry is only possible with highly optimized processes and based on a knowledge-based approach to problems.
Cochran, Kimberly; Townsend, Timothy; Reinhart, Debra; Heck, Howell
2007-01-01
Methodology for the accounting, generation, and composition of building-related construction and demolition (C&D) at a regional level was explored. Six specific categories of debris were examined: residential construction, nonresidential construction, residential demolition, nonresidential demolition, residential renovation, and nonresidential renovation. Debris produced from each activity was calculated as the product of the total area of activity and waste generated per unit area of activity. Similarly, composition was estimated as the product of the total area of activity and the amount of each waste component generated per unit area. The area of activity was calculated using statistical data, and individual site studies were used to assess the average amount of waste generated per unit area. The application of the methodology was illustrated using Florida, US approximately 3,750,000 metric tons of building-related C&D debris were estimated as generated in Florida in 2000. Of that amount, concrete represented 56%, wood 13%, drywall 11%, miscellaneous debris 8%, asphalt roofing materials 7%, metal 3%, cardboard 1%, and plastic 1%. This model differs from others because it accommodates regional construction styles and available data. The resulting generation amount per capita is less than the US estimate - attributable to the high construction, low demolition activity seen in Florida.
NASA Astrophysics Data System (ADS)
Wang, Haipeng; Xu, Feng; Jin, Ya-Qiu; Ouchi, Kazuo
An inversion method of bridge height over water by polarimetric synthetic aperture radar (SAR) is developed. A geometric ray description to illustrate scattering mechanism of a bridge over water surface is identified by polarimetric image analysis. Using the mapping and projecting algorithm, a polarimetric SAR image of a bridge model is first simulated and shows that scattering from a bridge over water can be identified by three strip lines corresponding to single-, double-, and triple-order scattering, respectively. A set of polarimetric parameters based on the de-orientation theory is applied to analysis of three types scattering, and the thinning-clustering algorithm and Hough transform are then employed to locate the image positions of these strip lines. These lines are used to invert the bridge height. Fully polarimetric image data of airborne Pi-SAR at X-band are applied to inversion of the height and width of the Naruto Bridge in Japan. Based on the same principle, this approach is also applicable to spaceborne ALOSPALSAR single-polarization data of the Eastern Ocean Bridge in China. The results show good feasibility to realize the bridge height inversion.
Precision monitoring of bridge deck curvature change during replacement.
DOT National Transportation Integrated Search
2016-05-01
This project was focused on development and deployment of a system for monitoring vertical : displacement in bridge decks and bridge spans. The system uses high precision wireless inclinometer : sensors to monitor inclinations at various points of a ...
Determining the effective system damping of highway bridges.
DOT National Transportation Integrated Search
2009-06-01
This project investigates four methods for modeling modal damping ratios of short-span and isolated : concrete bridges subjected to strong ground motion, which can be used for bridge seismic analysis : and design based on the response spectrum method...
Terrestrial laser scanning-based bridge structural condition assessment : InTrans project reports.
DOT National Transportation Integrated Search
2016-05-01
Objective, accurate, and fast assessment of a bridges structural condition is critical to the timely assessment of safety risks. : Current practices for bridge condition assessment rely on visual observations and manual interpretation of reports a...
Construction of crack-free bridge decks.
DOT National Transportation Integrated Search
2017-04-01
This serves as the final report on Transportation Pooled-Fund Program Project No. TPF-5(174), Construction : of Crack-Free Bridge Decks. The goal of the study was to implement the most cost-effective techniques for : improving bridge deck life ...
Implementing HPC on the Sunshine Bridge project
DOT National Transportation Integrated Search
2007-11-01
This report presents the research work from a pilot program regarding the feasibility of implementing high performance concrete on Arizona bridge decks, using the Sunshine Bridge in Holbrook, Arizona as a test case. An existing concrete slab was remo...
Implementing HPC on the Sunshine Bridge Project
DOT National Transportation Integrated Search
2007-11-16
This report presents the research work from a pilot program regarding the feasibility of implementing high performance concrete on Arizona bridge decks, using the Sunshine Bridge in Holbrook, Arizona as a test case. An existing concrete slab was remo...
List of public hearing & comment period document(s) for the Northeast Gateway Energy Bridge Deepwater Port, Federal Waters of Massachusetts Bay (Modification to Existing Permit LNG Regasification Vessel/DWP Project).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Britto, Ronnie; Brown, Bridget; Hale, Timothy B.
American Recovery and Reinvestment Act (ARRA) funding was provided to supplement the environmental management program at several DOE sites, including the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Demolition of the ETTP K-33 Building, the largest building to be demolished to date in Oak Ridge, was awarded to LSRS in FY-2010 under the ARRA program. The K-33 building was an 82 foot tall 2-story structure covering approximately 32 acres. Once this massive building was brought down to the ground, the debris was segregated and consolidated into piles of concrete rubble and steel across the remaining pad. The processmore » of demolishing the building, tracking across concrete debris with heavy equipment, and stockpiling the concrete rubble caused it to become pulverized. During and after storm events, hexavalent chromium leached from the residual cement present in the large quantities of concrete. Storm water control measures were present to preclude migration of contaminants off-site, but these control measures were not designed to control hexavalent chromium dissolved in storm water from reaching nearby receiving water. The following was implemented to mitigate hexavalent chromium in storm water: - Steel wool was distributed around K-33 site catch basins and in water pools as an initial step in addressing hexavalent chromium. - Since the piles of concrete were too massive and unsafe to tarp, they were placed into windrows in an effort to reduce total surface area. - A Hach colorimetric field meter was acquired by the K-33 project to provide realtime results of hexavalent chromium in site surface water. - Three hexavalent chromium treatment systems were installed at three separate catch basins that receive integrated storm water flow from the K-33 site. Sodium bisulfite is being used as a reducing agent for the immobilization of hexavalent chromium while also assisting in lowering pH. Concentrations initially were 310 - 474 ppb of hexavalent chromium in surface water at the out-falls that discharge to nearby receiving water. After implementation of the actions described above, concentrations of hexavalent chromium have been effectively reduced to less than 25 ppb at the out-falls. The LSRS team completed demolition of K-33 five months ahead of schedule, and debris removal was completed three months ahead of schedule. A total of 164,000 tons of steel and concrete from the building demolition, accounting for 13,000 shipments, were disposed to the EMWMF. Because of the high toxicity of hexavalent chromium at low concentrations, hexavalent chromium had to be controlled at ppb levels. Hexavalent chromium contaminant concentrations were successfully reduced by over 90% in surface water discharged from the K-33 demolition site into nearby receiving water. Initial efforts of wind-rowing debris piles and obtaining real-time hexavalent chromium measurements to focus initiatives coupled with placement of steel wool in pools or catch basins had some effectiveness. More significant reductions were obtained as the debris piles were removed/disposed in EMWMF, and treatment of surface water with sodium bisulfite in integrated manholes occurred. (authors)« less
Tritium systems test assembly stabilization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jasen, W. G.; Michelotti, R. A.; Anast, K. R.
The Tritium Systems Test Assembly (TSTA) was a facility dedicated to tritium technology Research and Development (R&D) primarily for future fusion power reactors. The facility was conceived in mid 1970's, operations commenced in early 1980's, stabilization and deactivation began in 2000 and were completed in 2003. The facility will remain in a Surveillance and Maintenance (S&M) mode until the Department of Energy (DOE) funds demolition of the facility, tentatively in 2009. A safe and stable end state was achieved by the TSTA Facility Stabilization Project (TFSP) in anticipation of long term S&M. At the start of the stabilization project, withmore » an inventory of approximately 140 grams of tritium, the facility was designated a Hazard Category (HC) 2 Non-Reactor Nuclear facility as defined by US Department of Energy standard DOE-STD-1027-92 (1997). The TSTA facility comprises a laboratory area, supporting rooms, offices and associated laboratory space that included more than 20 major tritium handling systems. The project's focus was to reduce the tritium inventory by removing bulk tritium, tritiated water wastes, and tritium-contaminated high-inventory components. Any equipment that remained in the facility was stabilized in place. All of the gloveboxes and piping were rendered inoperative and vented to atmosphere. All equipment, and inventoried tritium contamination, remaining in the facility was left in a safe-and-stable state. The project used the End Points process as defined by the DOE Office of Environmental Management (web page http://www.em.doe.- gov/deact/epman.htmtlo) document and define the end state required for the stabilization of TSTA Facility. The End Points process added structure that was beneficial through virtually all phases of the project. At completion of the facility stabilization project the residual tritium inventory was approximately 3,000 curies, considerably less than the 1.6-gram threshold for a HC 3 facility. TSTA is now designated as a Radiological Facility. Innovative approaches were employed for characterization and removal of legacy wastes and high inventory components. Major accomplishments included: (1) Reduction of tritium inventory, elimination of chemical hazards, and identification and posting of remaining hazards. (2) Removal of legacy wastes. (3) Transferred equipment for reuse in other DOE projects, including some at other DOE facilities. (4) Transferred facility in a safe and stable condition to the S&M organization. The project successfully completed all project goals and the TSTA facility was transferred into S&M on August 1,2003. This project demonstrates the benefit of radiological inventory reduction and the removal of legacy wastes to achieve a safe and stable end state that protects workers and the environment pending eventual demolition of the facility.« less
Plans for crash-tested bridge railings for longitudinal wood decks
M. A. Ritter; R. K. Faller; P. D. Hilbrich Lee; B. T. Rosson; S. R. Duwadi
1995-01-01
In the past decade, bridge railing design criteria have moved away from static-load design and have focused on full-scale crash testing as a more appropriate and reliable means of evaluating bridge railings. The five bridge railing plans presented reflect the results of a cooperative research project between the Midwest Roadside Safety Facility, University of Nebraska...
Fiberglass reinforced polymer composite bridge deck construction in Illinois
DOT National Transportation Integrated Search
2002-09-01
An experiment was conducted using a fiber reinforced polymer composite material for the bridge deck of a low volume bridge. The test location was on South Fayette Street over the Town Brook in Jacksonville, Illinois. This project included removal of ...
The DataBridge: A System For Optimizing The Use Of Dark Data From The Long Tail Of Science
NASA Astrophysics Data System (ADS)
Lander, H.; Rajasekar, A.
2015-12-01
The DataBridge is a National Science Foundation funded collaborative project (OCI-1247652, OCI-1247602, OCI-1247663) designed to assist in the discovery of dark data sets from the long tail of science. The DataBridge aims to to build queryable communities of datasets using sociometric network analysis. This approach is being tested to evaluate the ability to leverage various forms of metadata to facilitate discovery of new knowledge. Each dataset in the Databridge has an associated name space used as a first level partitioning. In addition to testing known algorithms for SNA community building, the DataBridge project has built a message-based platform that allows users to provide their own algorithms for each of the stages in the community building process. The stages are: Signature Generation (SG): An SG algorithm creates a metadata signature for a dataset. Signature algorithms might use text metadata provided by the dataset creator or derive metadata. Relevance Algorithm (RA): An RA compares a pair of datasets and produces a similarity value between 0 and 1 for the two datasets. Sociometric Network Analysis (SNA): The SNA will operate on a similarity matrix produced by an RA to partition all of the datasets in the name space into a set of clusters. These clusters represent communities of closely related datasets. The DataBridge also includes a web application that produces a visual representation of the clustering. Future work includes a more complete application that will allow different types of searching of the network of datasets. The DataBridge approach is relevant to geoscience research and informatics. In this presentation we will outline the project, illustrate the deployment of the approach, and discuss other potential applications and next steps for the research such as applying this approach to models. In addition we will explore the relevance of DataBridge to other geoscience projects such as various EarthCube Building Blocks and DIBBS projects.
VIEW OF RBC (REFINED BICARBONATE) BUILDING LOOKING NORTHEAST. DEMOLITION IN ...
VIEW OF RBC (REFINED BICARBONATE) BUILDING LOOKING NORTHEAST. DEMOLITION IN PROGRESS. "ARM & HAMMER BAKING SODA WAS MADE HERE FOR OVER 50 YEARS AND THEN SHIPPED ACROSS THE STREET TO THE CHURCH & DWIGHT PLANT ON WILLIS AVE. (ON THE RIGHT IN THIS PHOTO). LAYING ON THE GROUND IN FRONT OF C&D BUILDING IS PART OF AN RBC DRYING TOWER. - Solvay Process Company, Refined Bicarbonate Building, Between Willis & Milton Avenues, Solvay, Onondaga County, NY
Journal of Special Operations Medicine, Volume 6, Edition 1, Winter 2006
2006-01-01
Mark A. Antonacci, MD; Paul L. Link, NC Stress Fracture and Attrition in Basic Underwater Demolition SEAL Trainees Daniel W. Trone, MA; Adriana ...Special Operations Medicine32 Stress Fracture and Attrition in Basic Underwater Demolition SEAL Trainees Daniel W. Trone, MA; Adriana Villaseñor, MPH...effects of physical activity, with a focus on functional decline and injuries in recreational and military populations. Adriana Villaseñor, MPH, is
Rodríguez, Carlos; Miñano, Isabel; Aguilar, Miguel Ángel; Ortega, José Marcos; Parra, Carlos; Sánchez, Isidro
2017-11-30
In recent years there has been an increasing tendency to recycle the wastes generated by building companies in the construction industry, demolition wastes being the most important in terms of volume. The aim of this work is to study the possibility of using recycled aggregates from construction and demolition wastes in the preparation of precast non-structural concretes. To that purpose, two different percentages (15% and 30%) of natural aggregates were substituted by recycled aggregates in the manufacture of paving blocks and hollow tiles. Dosages used by the company have not been changed by the introduction of recycled aggregate. Precast elements have been tested by means of compressive and flexural strength, water absorption, density, abrasion, and slipping resistance. The results obtained show the possibility of using these wastes at an industrial scale, satisfying the requirements of the Spanish standards for these elements.
Rodríguez, Carlos; Miñano, Isabel; Aguilar, Miguel Ángel; Parra, Carlos
2017-01-01
In recent years there has been an increasing tendency to recycle the wastes generated by building companies in the construction industry, demolition wastes being the most important in terms of volume. The aim of this work is to study the possibility of using recycled aggregates from construction and demolition wastes in the preparation of precast non-structural concretes. To that purpose, two different percentages (15% and 30%) of natural aggregates were substituted by recycled aggregates in the manufacture of paving blocks and hollow tiles. Dosages used by the company have not been changed by the introduction of recycled aggregate. Precast elements have been tested by means of compressive and flexural strength, water absorption, density, abrasion, and slipping resistance. The results obtained show the possibility of using these wastes at an industrial scale, satisfying the requirements of the Spanish standards for these elements. PMID:29189745
DOT National Transportation Integrated Search
2011-09-01
Many U.S. bridges were built during the 1960s. Evaluating the structural condition of these bridges under todays traffic loads and safety expectations is difficult. This project is developing a practical program for structural health monitoring of...
Bridge scour conference shares knowledge and innovations : Tech Transfer Spotlight
DOT National Transportation Integrated Search
2018-01-01
The National Cooperative Highway Research Programs Domestic Scan (NCHRP Project 20-68A) on bridge scour risk management brought more than 30 national bridge scour experts together for a week in July 2016 to examine ways to prevent and remediate br...
Bridge maintenance program for the City of Columbia, Missouri : tech transfer summary.
DOT National Transportation Integrated Search
2017-09-01
The primary goal of this research was to extend the service lives of bridges in Columbia, Missouri. The overarching objective of the project was to develop bridge maintenance and preservation guidelines that focus on practical and implementable techn...
Evaluation of high performance pavement and bridge deck wearing surface repair materials.
DOT National Transportation Integrated Search
2016-08-01
This project provided for a laboratory and field testing of several high performance repair materials for : pavements and concrete bridge decks. The main purpose was to provide ODOT with materials and procedures : to shorten road and bridge closures....
The Effects of the Japan Bridge Project on Third Graders' Cultural Sensitivity
ERIC Educational Resources Information Center
Meyer, Lindsay; Sherman, Lilian; MaKinster, James
2006-01-01
This study examines the effects of the Japan BRIDGE Project, a global education program, on its third grade participants. Characterization of lessons and analysis of student interviews were used to investigate the nature of the curriculum and whether or not student participants were more culturally sensitive due to participation. Results indicate…
DOT National Transportation Integrated Search
2014-01-01
Causing loss of use and sometimes life, bridge collapses are always high profile and hit many wallets. The economic benefits of condition-based maintenance are well established, including reduced visual inspection and potentially longer structural li...
ERIC Educational Resources Information Center
Anderson, Richard
2008-01-01
Career and technical education (CTE) has a promising future at Darlington (WI) High School. In this article, the author describes how a class bridge project became a real-world, project-based learning opportunity involving higher-level thinking skills that are at the core of CTE at his school. It began when a local citizen approached him at the…
THE BRIDGE PROJECT FOLLOWUP STUDY.
ERIC Educational Resources Information Center
GREENBERG, HAROLD; AND OTHERS
AN EXPERIMENT CONDUCTED AT THE JUNIOR HIGH SCHOOL LEVEL IN NEW YORK CITY TO EVALUATE THE EFFECTIVENESS OF A NEW KIND OF LEARNING ENVIRONMENT ON THE EDUCATION OF DISADVANTAGED YOUTH WAS UNDERTAKEN AS A FOLLOWUP TO THE "BRIDGE" PROJECT. THE FUNDAMENTALS INVOLVED USING A NEW TYPE OF TEAM-TEACHING INSTRUCTION IN THE AREAS OF ENGLISH,…
NASA's S'COOL Project: Bridging the Divide Between the 'Real' World and the Classroom
NASA Technical Reports Server (NTRS)
Sepulveda, Roberto; Chambers, Lin H.
2004-01-01
In an effort to bridge the gap between scientific research, teacher instruction and student learning, the CERES Students Cloud Observations On-Line (S'COOL) Project offers a unique perspective on how to narrow the divide between the real world and the classroom. Reality-based learning has become a staple in the education of our youth and the S'COOL Project has taken this concept one step further.
ERIC Educational Resources Information Center
Ungar, Harry; Brown, David R.
2010-01-01
ChemEd Bridges is an NSF-funded project that provides career and professional development opportunities for chemistry faculty members who teach at two-year colleges (2YCs). We broaden the interests and the horizons of these faculty members by building bridges between them and the broader community of chemical educators. In particular, we have…
Early warning system for bridge hits by tall load vehicles.
DOT National Transportation Integrated Search
2008-12-01
The prime objective of the project was to evaluate products offered by two companies. These companies are CYRA and Bridge-Test. Two of their products were evaluated to see if they can server the departmental need to check the bridge clearances quickl...
Study of an overload truck screening system for a sustainable highway bridge network.
DOT National Transportation Integrated Search
2009-01-01
he objective of this project was to study the use and implementation of an overload truck screening system for bridge structures. This screening system combines two advanced technologies, namely a weigh-in-motion (WIM) system and a bridge strain sens...
DOT National Transportation Integrated Search
2014-08-01
The goal of everyone in the transportation community is to build bridges : that are economic, easy to construct, and durable. Therefore, accelerating : bridge construction through the use of precast concrete or prefabricated : steel girders is a comm...
DOT National Transportation Integrated Search
2013-08-01
The objective of this work, Pilot Project - Demonstration of Capabilities and Benefits of Bridge Load Rating through Physical Testing, was to demonstrate the capabilities for load testing and rating bridges in Iowa, study the economic benefit of perf...
DOT National Transportation Integrated Search
2013-08-01
The objective of this work, Pilot Project - Demonstration of Capabilities and Benefits of Bridge Load Rating through Physical Testing, was to demonstrate the capabilities for load testing and rating bridges in Iowa, study the economic benefit of perf...
DOT National Transportation Integrated Search
2013-08-01
The objective of this work, Pilot Project - Demonstration of Capabilities and Benefits of Bridge Load Rating through Physical Testing, was to demonstrate the capabilities for load testing and rating bridges in Iowa, study the economic benefit of perf...
DOT National Transportation Integrated Search
2014-10-01
This report summarizes findings from monitoring data that was collected over a two-year period from Bridge No. : 61390613004101 in the John James Audubon Project, which was formerly designated as Bridge #2 prior to : construction completion. The brid...
DOT National Transportation Integrated Search
1998-01-01
VDOT is implementing Pontis 3.0 to provide the analytical component of its Bridge Management System (BMS). This system prioritizes bridge maintenance, repair, rehabilitation, and replacement (MRR & R) needs using cost/benefit analysis. The accuracy o...
Quantum non-demolition phonon counter with a hybrid optomechnical system
NASA Astrophysics Data System (ADS)
Song, Qiao; Zhang, KeYe; Dong, Ying; Zhang, WeiPing
2018-05-01
A phonon counting scheme based on the control of polaritons in an optomechanical system is proposed. This approach permits us to measure the number of phonons in a quantum non-demolition (QND) manner for arbitrary modes not limited by the frequency matching condition as in usual photon-phonon scattering detections. The performance on phonon number transfer and quantum state transfer of the counter are analyzed and simulated numerically by taking into account all relevant sources of noise.
2009-10-01
adverse impacts on geology and soils would be anticipated due to construction and demolition activities, such as grading, excavation, and...2, during construction and demolition activities would limit adverse impacts on geology and soils. Therefore, no long-term, adverse, direct or...20 99 113 70 70 99 65 70 20 Live Oak Loma Rica Tierra Buena Wheatland Lincoln Linda Marysville Olivehurst South Yuba City Yuba City Source: ESRI
Final Environmental Assessment: Base-Wide Building Demolition Arnold Air Force Base, Tennessee
2006-02-01
Building • Engine Test Facility ( ETF )-B Exhauster • ETF -A Airside • ETF -A Exhauster • ETF -A Reefer • CE Facility • Rocket Storage • Von Karman Gas...Executive Order ESA Endangered Species Act ETF Engine Test Facility FamCamp Family Camping Area P:\\ARNOLDAFB\\333402DO42COMPLIANCE\\DEMOLITION...Fabrication Shop • Natural Resources Building • Salt Storage Building • Administration Building • Engine Test Facility ( ETF )-B Exhauster • ETF -A
2003-12-01
Action can be divided into demolition activities and construction activities. Demolition activities would include the complete removal of 13 multi...that protects those most affected by noise and that can often be achieved on a practical basis. Base activities that have the highest potential...Family Housing – Phase V MacDill AFB, Florida has been approved by the state and Federal fish and wildlife agencies. Land use on MacDill AFB
Prospects of effective microorganisms technology in wastes treatment in Egypt.
Shalaby, Emad A
2011-06-01
Sludge dewatering and treatment may cost as much as the wastewater treatment. Usually large proportion of the pollutants in wastewater is organic. They are attacked by saprophytic microorganisms, i.e. organisms that feed upon dead organic matter. Activity of organisms causes decomposition of organic matter and destroys them, where the bacteria convert the organic matter or other constituents in the wastewater to new cells, water, gases and other products. Demolition activities, including renovation/remodeling works and complete or selective removal/demolishing of existing structures either by man-made processes or by natural disasters, create an extensive amount of wastes. These demolition wastes are characterized as heterogeneous mixtures of building materials that are usually contaminated with chemicals and dirt. In developing countries, it is estimated that demolition wastes comprise 20% to 30% of the total annual solid wastes. In Egypt, the daily quantity of construction and demolition (C&D) waste has been estimated as 10 000 tones. That is equivalent to one third of the total daily municipal solid wastes generated per day in Egypt. The zabbaliin have since expanded their activities and now take the waste they collect back to their garbage villages where it is sorted into recyclable components: paper, plastics, rags, glass, metal and food. The food waste is fed to pigs and the other items are sold to recycling centers. This paper summarizes the wastewater and solid wastes management in Egypt now and future.
Evaluation of corrosion and corrosion control on interstate 89 bridge #30 and #31.
DOT National Transportation Integrated Search
2015-06-01
This report summarizes the evaluation of the performance of cathodic protection installed on I-89 bridges over : Gile Pond Road (NH Route 114) during a rehabilitation project in 1987. : Control bridges of I-89 over Hominy Pot Road, approximately 1.5 ...
DOT National Transportation Integrated Search
2009-01-01
Vol. 1-1: In July 2006, construction began on an accelerated bridge project in Boone County, Iowa that was composed of precast substructure : elements and an innovative, precast deck panel system. The superstructure system consisted of full-depth dec...
Loads calibrations of strain gage bridges on the DAST project Aeroelastic Research Wing (ARW-1)
NASA Technical Reports Server (NTRS)
Eckstrom, C. V.
1980-01-01
The details of and results from the procedure used to calibrate strain gage bridges for measurement of wing structural loads for the DAST project ARW-1 wing are presented. Results are in the form of loads equations and comparison of computed loads vs. actual loads for two simulated flight loading conditions.
The Bridge Project: Connecting Home, School, and Community for Mexican Immigrant Children
ERIC Educational Resources Information Center
McElvain, Cheryl Marie
2015-01-01
This study examines the academic and psychosocial effects of the Bridge Project after-school program on 25 prekindergarten through 6th-grade English language learner Mexican immigrant children and their families living in an affordable housing complex in the San Francisco Bay Area. The results of the study show that the program increased the…
A Field Assessment of Timber Highway Bridge Durability in the United States
J.P. Wacker; B.K. Brashaw; F. Jalinoos
2015-01-01
This paper summarizes a cooperative project to assess the current condition and life expectancy of 132 timber highway bridge superstructures at locations throughout the United States. Several superstructure types were included in this comprehensive effort, of which two-thirds were sawn timber stringer systems. In-depth inspections were conducted by the project team...
Lu, Weisheng; Yuan, Hongping; Li, Jingru; Hao, Jane J L; Mi, Xuming; Ding, Zhikun
2011-04-01
The construction and demolition waste generation rates (C&D WGRs) is an important factor in decision-making and management of material waste in any construction site. The present study investigated WGRs by conducting on-site waste sorting and weighing in four ongoing construction projects in Shenzhen city of South China. The results revealed that WGRs ranged from 3.275 to 8.791 kg/m(2) and miscellaneous waste, timber for formwork and falsework, and concrete were the three largest components amongst the generated waste. Based on the WGRs derived from the research, the paper also discussed the main causes of waste in the construction industry and attempted to connect waste generation with specific construction practices. It was recommended that measures mainly including performing waste sorting at source, employing skilful workers, uploading and storing materials properly, promoting waste management capacity, replacing current timber formwork with metal formwork and launching an incentive reward program to encourage waste reduction could be potential solutions to reducing current WGRs in Shenzhen. Although these results were derived from a relatively small sample and so cannot justifiably be generalized, they do however add to the body of knowledge that is currently available for understanding the status of the art of C&D waste management in China. Copyright © 2010 Elsevier Ltd. All rights reserved.
Do, Sang Yoon; Lee, Chul Gab; Kim, Jae Yoon; Moon, Young Hoon; Kim, Min Sung; Bae, In Ho; Song, Han Soo
2017-01-01
In 2015, workers dismantling a fluorescent lamp factory in Korea were affected by mercury poisoning from exposure to mercury vapor. Eighteen out of the 21 workers who participated in the demolition project presented with symptoms of poisoning and, of these, 10 had persistent symptoms even at 18 months after the initial exposure to mercury vapor. Early symptoms of 18 workers included a general skin rash, pruritus, myalgia, sleep disturbance, and cough and sputum production. Following alleviation of these initial symptoms, late symptoms, such as easy fatigue, insomnia, bad dreams, and anxiety disorder, began to manifest in 10 out of 18 patients. Seven workers underwent psychiatric care owing to sleep disturbance, anxiety disorder, and depression, and three workers underwent dermatologic treatment for hyperpigmentation, erythematous skin eruption, and chloracne-like skin lesions. Furthermore, three workers developed a coarse jerky movement, two had swan neck deformity of the fingers, and two received care at an anesthesiology clinic for paresthesia, such as burning sensation, cold sensation, and pain. Two workers underwent urologic treatment for dysfunction of the urologic system and impotence. However, symptomatic treatment did not result in satisfactory relief of these symptoms. Awareness of the perils of mercury and prevention of mercury exposure are critical for preventing health hazards caused by mercury vapor. Chelation therapy should be performed promptly following mercury poisoning to minimize damage.
Restoration of the Golden Horn Estuary (Halic).
Coleman, Heather M; Kanat, Gurdal; Aydinol Turkdogan, F Ilter
2009-12-01
Restoration of the iconic Golden Horn Estuary in Istanbul, Turkey was a substantial political, logistical, ecological, and social challenge. Forty years of uncontrolled industrial and urban growth resulted in thick layers of anoxic sediment, toxic bacteria, strong hydrogen sulfide odor, and ecologically unlivable conditions. The major components of restoration, spanning two decades, have included (1) demolition and relocation of industries and homes along the shore, (2) creation of wastewater infrastructure, (3) removal of anoxic sludge from the estuary, (4) removal of a floating bridge that impeded circulation, and (5) creation of cultural and social facilities. Although Turkey is not known as an environmental leader in pollution control, the sum of these efforts was largely successful in revitalizing the area through dramatic water quality improvement. Consequently, the estuary is once again inhabitable for aquatic life as well as amenable to local resource users and foreign visitors, and Istanbul has regained a lost sense of cultural identity. This paper focuses on literature review and personal interviews to discuss the causes of degradation, solutions employed to rehabilitate the estuary, and subsequent physicochemical, ecological, and social changes.
Code of Federal Regulations, 2011 CFR
2011-04-01
... bridge if the Indian Tribe does not support the project? 661.59 Section 661.59 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.59 What should be done with a deficient BIA owned IRR bridge if the Indian Tribe does not...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-28
... Street (``Murray Morgan'') Bridge across City Waterway also known as the Thea Foss Waterway, mile 0.6, at... INFORMATION: The City of Tacoma has requested to place the South 11th Street ``Murray Morgan'' Bridge in the... rehabilitation project on the bridge. The South 11th Street Bridge crosses City Waterway mile 0.6 at Tacoma, WA...
Code of Federal Regulations, 2010 CFR
2010-04-01
... bridge if the Indian Tribe does not support the project? 661.59 Section 661.59 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.59 What should be done with a deficient BIA owned IRR bridge if the Indian Tribe does not...
NASA Astrophysics Data System (ADS)
Berthelot, M.; Nony, N.; Gugi, L.; Bishop, A.; De Luca, L.
2015-02-01
The history and identity of the Avignon's bridge is inseparable from that of the Rhône river. Therefore, in order to share the history and memory of the Rhône, it is essential to get to know this bridge and especially to identify and make visible the traces of its past, its construction, its interaction with the river dynamics, which greatly influenced his life. These are the objectives of the PAVAGE project that focuses on digitally surveying, modelling and re-visiting a heritage site of primary importance with the aim of virtually restoring the link between the two sides which, after the disappearance of the Roman bridge of Arles, constituted for a long time the only connection between Lyon or Vienna and the sea. Therefore, this project has an important geo-historical dimension for which geo-morphological and paleoenvironmental studies were implemented in connection with the latest digital simulation methods exploiting geographic information systems. By integrating knowledge and reflections of archaeologists, historians, geomorphologists, environmentalists, architects, engineers and computer scientists, the result of this project (which involved 5 laboratories during 4 years) is a 3D digital model covering an extension of 50 km2 achieved by integrating satellite imagery, UAV-based acquisitions, terrestrial laser scanning and photogrammetry, etc. Beyond the actions of scientific valorisation concerning the historical and geomorphological dimensions of the project, the results of this work of this interdisciplinary investigation and interpretation of this site are today integrated within a location-based augmented reality application allowing tourists to exploring the virtual reconstruction of the bridge and its environment through tablets inside the portion of territory covered by this project (between Avignon and Villeneuve-lez-Avignon). This paper presents the main aspects of the 3D virtual reconstruction approach.
NASA Astrophysics Data System (ADS)
Godinez-Azcuaga, Valery F.; Inman, Daniel J.; Ziehl, Paul H.; Giurgiutiu, Victor; Nanni, Antonio
2011-04-01
This paper presents the most recent advances in the development of a self powered wireless sensor network for steel and concrete bridges monitoring and prognosis. This five-year cross-disciplinary project includes development and deployment of a 4-channel acoustic emission wireless node powered by structural vibration and wind energy harvesting modules. In order to accomplish this ambitious goal, the project includes a series of tasks that encompassed a variety of developments such as ultra low power AE systems, energy harvester hardware and especial sensors for passive and active acoustic wave detection. Key studies on acoustic emission produced by corrosion on reinforced concrete and by crack propagation on steel components to develop diagnosis tools and models for bridge prognosis are also a part of the project activities. It is important to mention that the impact of this project extends beyond the area of bridge health monitoring. Several wireless prototype nodes have been already requested for applications on offshore oil platforms, composite ships, combat deployable bridges and wind turbines. This project was awarded to a joint venture formed by Mistras Group Inc, Virginia Tech, University of South Carolina and University of Miami and is sponsored through the NIST-TIP Grant #70NANB9H007.
DOT National Transportation Integrated Search
2006-01-01
A continuous slab bridge in Louisa County, Virginia, on Route 701 developed a planar horizontal crack along the length of all three spans. This project was designed to determine if the current 12-ton posted load restriction of the bridge (instituted ...
DOT National Transportation Integrated Search
2003-01-01
The Tom's Creek Bridge is a small-scale demonstration project involving the use of fiber-reinforced polymer (FRP) composite girders as the main load carrying members. It is a simply supported, short-span bridge located along Tom's Creek Road in Black...
DOT National Transportation Integrated Search
2008-10-01
A normal bridge approach slab in Louisiana is a reinforced concrete slab. It connects : the bridge deck to the adjacent paved roadway. Its intended functions are: : 1. To span the void that may develop below the slab due to soil erosion or : embankme...
A bridge deck anti-icing system in Virginia : lessons learned from a pilot study.
DOT National Transportation Integrated Search
2004-01-01
The need for this project originated with Virginia Department of Transportation's (VDOT) plans to widen and replace a number of bridges along Route I-95. Many of the bridge decks in the new facilities will be in the shade, which will increase the pro...
Vehicular crash tests of the California ST-20 bridge rail.
DOT National Transportation Integrated Search
2004-07-01
Over the course of this project a see-through steel bridge rail (Type California ST-20) was developed and tested. The ST-20, as tested, is at the limits of meeting the NCHRP Report 3501 TL-4 test matrix. The bridge rail also met the requirements esta...
DOT National Transportation Integrated Search
2015-12-01
Even though the FHWAs National Bridge Inspection Standards are a very comprehensive tool for : bridge inspection, they only apply to structures with spans of more than 20 feet. WYDOT inspects : these larger bridges on regular intervals, but there ...
76 FR 63840 - Drawbridge Operation Regulation; Corson Inlet, Strathmere, NJ
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-14
... during the project while the railings on the moveable span portion of the bridge are replaced. DATES... deviation from the regulations governing the operation of the Corson Inlet Bridge (County Route 619), at.... SUPPLEMENTARY INFORMATION: The Cape May County Bridge Commission, who owns and operates this bascule drawbridge...
77 FR 420 - Drawbridge Operation Regulation; Corson Inlet, Stathmere, NJ
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-05
... the course of the project, while the railings on the moveable span portion of the bridge are replaced... deviation from the regulations governing the operation of the Corson Inlet Bridge (County Route 619), across... INFORMATION: The Cape May County Bridge Commission, who owns and operates this bascule drawbridge, has...
Structural load testing and flexure analysis of the Route 701 Bridge in Louisa County, Virginia.
DOT National Transportation Integrated Search
2004-01-01
A continuous slab bridge in Louisa County, Virginia, on Route 701 developed a planar horizontal crack along the length of all three spans. This project was designed to determine if the current load rating of the bridge could be raised and to document...
Updating the school bus standard vehicle for load rating Alabama bridges.
DOT National Transportation Integrated Search
2010-06-01
The objective of this project is to identify a representative school bus (weight and axle spacing) for load rating highway bridges. The ALDOT Bridge Rating and Load Test Section currently uses a 12.5-ton school bus (four tons on the front axle and 8....
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-15
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13346-002] PayneBridge, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On November 1, 2012, PayneBridge, LLC filed an application for a...
2011-07-01
KIRTLAND AIR FORCE BASE, NEW MEXICO JULY 2011 Report Documentation Page Form ApprovedOMB No. 0704...Facilities Demolition and Expansion at Kirtland Air Force Base, New Mexico 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d...EXPANSION KIRTLAND AIR FORCE BASE, NEW MEXICO Pursuant to the Council on Environmental Quality (CEQ) regulations for implementing procedural
Procedures for Estimating the Flat-Weighted Peak Level Produced by Surface and Buried Charges
1988-08-01
Demolitions and Their Equivalent Weights 11 3 Blast Noise Complaint Potential 15 4 Results of Tests at Fort Lewis, WA in dB 16 5 Results of Tests at...PRODUCED BY SURFACE AND BURIED CHARGES 1 INTRODUCTION Background Blast noise from Army demolitions often causes residents of nearby communities to... blast noise were compared to measurements made at two different locations. The basic equations used in this procedure are discussed in detail in USA
Improving Student Learning via Mobile Phone Video Content: Evidence from the BridgeIT India Project
ERIC Educational Resources Information Center
Wennersten, Matthew; Quraishy, Zubeeda Banu; Velamuri, Malathi
2015-01-01
Past efforts invested in computer-based education technology interventions have generated little evidence of affordable success at scale. This paper presents the results of a mobile phone-based intervention conducted in the Indian states of Andhra Pradesh and Tamil Nadu in 2012-13. The BridgeIT project provided a pool of audio-visual learning…
ERIC Educational Resources Information Center
Ottenritter, Nan; Barnett, Lynn
The American Association of Community Colleges (AACC) instituted the Bridges to Healthy Communities project in 1995 as part of a 5-year strategy to develop campus-based programs for preventing HIV infection and related health problems among college students. The Centers for Disease Control and Prevention (CDC) sponsored the national effort through…
ERIC Educational Resources Information Center
Berney, Tomi D.; Plotkin, Donna
Project BRIDGES, a 3-year program conducted for students of limited English proficiency (LEP) at three High Schools in Brooklyn (New York City) sought to develop the English language, academic, and vocational skills of a high-risk LEP population. The native languages of the participating students were Haitian Creole, Spanish, Chinese, Hebrew, and…
DOT National Transportation Integrated Search
2009-01-01
Highlights of four projects by the Iowa Department of Transportation, Research and Technology Bureau: 1) Precast Bridge Approach (Pavements), 2) Teen Driver (Safety), 3) Winter Maintenance, and 4) Structural Health Monitoring (Bridges and structures)...
77 FR 58906 - Notice of Final Federal Agency Actions on Proposed Highway in Minnesota
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-24
... the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project on I-90 over the Mississippi River. The proposed project includes replacement of the Interstate 90 (I-90) Dresbach Bridge over the Mississippi River with a new bridge that meets structural and geometric standards as well as...
Code of Federal Regulations, 2012 CFR
2012-10-01
... previously; (6) Requests for LOMRs and PMRs based on projects involving bridges, culverts, or channels, or... involving new hydrologic information, bridges, culverts, or channels, or combinations thereof; and (11...
Code of Federal Regulations, 2013 CFR
2013-10-01
... previously; (6) Requests for LOMRs and PMRs based on projects involving bridges, culverts, or channels, or... involving new hydrologic information, bridges, culverts, or channels, or combinations thereof; and (11...
Code of Federal Regulations, 2011 CFR
2011-10-01
... previously; (6) Requests for LOMRs and PMRs based on projects involving bridges, culverts, or channels, or... involving new hydrologic information, bridges, culverts, or channels, or combinations thereof; and (11...
Code of Federal Regulations, 2014 CFR
2014-10-01
... previously; (6) Requests for LOMRs and PMRs based on projects involving bridges, culverts, or channels, or... involving new hydrologic information, bridges, culverts, or channels, or combinations thereof; and (11...
I-5/Gilman advanced technology bridge project
NASA Astrophysics Data System (ADS)
Lanza di Scalea, Francesco; Karbhari, Vistasp M.; Seible, Frieder
2000-04-01
The UCSD led I-5/Gilman Advanced Technology Bridge Project will design and construct a fully functional traffic bridge of advanced composite materials across Interstate 5 in La Jolla, California. Its objective is to demonstrate the use of advanced composite technologies developed by the aerospace industry in commercial applications to increase the life expectancy of new structures and for the rehabilitation of aging infrastructure components. The structure will be a 450 ft long, 60 ft wide cable-stayed bridge supported by a 150 ft A-frame pylon with two vehicular lanes, two bicycle lanes, pedestrian walkways and utility tunnels. The longitudinal girders and pylon will be carbon fiber shells filled with concrete. The transverse deck system will consist of hollow glass/carbon hybrid tubes and a polypropylene fiber reinforced concrete deck with an arch action. Selected cables will be composite. The bridge's structural behavior will be monitored to determine how advanced composite materials perform in civil infrastructure applications. The bridge will be instrumented to obtain performance and structural health data in real time and, where possible, in a remote fashion. The sensors applied to the bridge will include electrical resistance strain gages, fiberoptic Bragg gratings and accelerometers.
Seo, Seongwon; Hwang, Yongwoo
1999-08-01
Construction and demolition (C&D) debris is generated at the site of various construction activities. However, the amount of the debris is usually so large that it is necessary to estimate the amount of C&D debris as accurately as possible for effective waste management and control in urban areas. In this paper, an effective estimation method using a statistical model was proposed. The estimation process was composed of five steps: estimation of the life span of buildings; estimation of the floor area of buildings to be constructed and demolished; calculation of individual intensity units of C&D debris; and estimation of the future C&D debris production. This method was also applied in the city of Seoul as an actual case, and the estimated amount of C&D debris in Seoul in 2021 was approximately 24 million tons. Of this total amount, 98% was generated by demolition, and the main components of debris were concrete and brick.
Quantum demolition filtering and optimal control of unstable systems.
Belavkin, V P
2012-11-28
A brief account of the quantum information dynamics and dynamical programming methods for optimal control of quantum unstable systems is given to both open loop and feedback control schemes corresponding respectively to deterministic and stochastic semi-Markov dynamics of stable or unstable systems. For the quantum feedback control scheme, we exploit the separation theorem of filtering and control aspects as in the usual case of quantum stable systems with non-demolition observation. This allows us to start with the Belavkin quantum filtering equation generalized to demolition observations and derive the generalized Hamilton-Jacobi-Bellman equation using standard arguments of classical control theory. This is equivalent to a Hamilton-Jacobi equation with an extra linear dissipative term if the control is restricted to Hamiltonian terms in the filtering equation. An unstable controlled qubit is considered as an example throughout the development of the formalism. Finally, we discuss optimum observation strategies to obtain a pure quantum qubit state from a mixed one.
Weil, Marcel; Jeske, Udo; Schebek, Liselotte
2006-06-01
Recycling of construction and demolition waste contributes decisively to the saving of natural mineral resources. In Germany, processed mineral construction and demolition waste from structural engineering is used nearly exclusively in civil engineering (earthwork and road construction sector) as open-loop recycling. Due to the planned stricter limit values for the protection of soil and water, however, this recycling path in civil engineering may no longer be applicable in the future. According to some new guidelines and standards adopted recently, recycled aggregates may also be used for concrete production in the structural engineering sector (closed-loop recycling). Wastes from the structural engineering sector can thus be kept in a closed cycle, and their disposal on a landfill can be avoided. The present report focuses on the determination of maximum waste volumes that may be handled by this new recycling option. Potential adverse effects on the saving of resources and climate protection have been analysed. For this purpose, materials flow analysis and ecobalancing methods have been used.
Construction and demolition waste as a source of PVC for recycling.
Prestes, Sabrina Moretto Darbello; Mancini, Sandro Donnini; Rodolfo, Antonio; Keiroglo, Raquel Carramillo
2012-02-01
Construction and demolition waste can contain considerable amounts of polyvinyl chloride (PVC). This paper describes a study of the recycling of PVC pipes collected from such waste materials. In a sorting facility for the specific disposal of construction and demolition waste, PVC was found to represent one-third of the plastics separated by workers. Pipes were sorted carefully to preclude any possible contamination by poly(ethylene terephthalate) (PET) found in the waste. The material was ground into two distinct particle sizes (final mesh of 12.7 and 8 mm), washed, dried and recycled. The average formulation of the pipes was determined based on ash content tests and used in the fabrication of a similar compound made mainly of virgin PVC. Samples of recycled pipes and of compound based on virgin material were subjected to tensile and impact tests and provided very similar results. These results are a good indication of the application potential of the recycled material and of the fact that longer grinding to obtain finer particles is not necessarily beneficial.
An integrated approach for the management of demolition waste in Cyprus.
Kourmpanis, Basilis; Papadopoulos, Achilleas; Moustakas, Konstantinos; Kourmoussis, Fotis; Stylianou, Marinos; Loizidou, Maria
2008-12-01
This study investigated the generation and management of demolition waste (DW) in Cyprus. A methodology has been developed and applied for the estimation of the quantities of the waste stream under examination, since quantitative primary data were not available. The existing situation relating to the practices applied for the management of DW was investigated and assessed. Furthermore, a multi-criteria analysis method (PROMETHEE II) was developed and applied in order to examine alternative systems that could be implemented for the management of the DW in the country. In particular, nine management systems (scenarios) were examined, evaluated and ranked according to their efficiency using seventeen individual criteria, divided into four groups (social-legislative, environmental, economic and technical). The ranking of the alternative waste management scenarios indicated that the optimum management system for possible implementation in the island included complete selective demolition procedures and transfer of mixed recyclable materials to the recycling centre and non-recyclable material to landfill.
MASH TL-3 crash testing and evaluation of the TxDOT T631 Bridge Rail.
DOT National Transportation Integrated Search
2016-07-01
The Texas Type T631 bridge rail was developed as a low-cost, flexible bridge rail system for TL-2 : applications. Many of the features used for the system tested at MwRSF for TL-3 were incorporated into the : design developed for this project for MAS...
DOT National Transportation Integrated Search
2005-02-01
MoDOT RDT Research Project R-I00-002 HPC for Bridge A6130 Route 412 Pemiscot County was recently completed in June of 2004 [Myers and Yang, 2004]. Among other research tasks, part of this research study investigated the creep, shrinkage and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schetke, Sophie; Haase, Dagmar
Demographic change and economic decline produce modified urban land use pattern and densities. Compared to the beginning of the 90s after the German reunification, nowadays massive housing and commercial vacancies followed by demolition and perforation come to pass in many cities of the former GDR. In consequence, a considerable surplus of urban brownfields has been created. Furthermore, the decline in the urban fabric affects social infrastructure and urban greenery of local neighbourhoods. Here, urban planning enters into 'uncharted territory' since it needs to assess the socio-environmental impact of shrinkage. In order to carry out such an evaluation quantitatively, a multi-criteriamore » assessment scheme (MCA) was developed and applied. Firstly, we identified infrastructure and land use changes related to vacancy and demolition. Secondly, demolition scenarios for the coming 20 years were applied in order to give an idea for a long-term monitoring approach at the local district level. A multi-criteria indicator matrix quantifies the socio-environmental impact on both urban greenery and residents. Using it, we set demolition scenarios against urban 'quality of life' targets. Empirical evidence comes from Leipzig, in eastern Germany, a representative case study for urban shrinkage processes. The results show that shrinkage implies socio-environmental changes of residential livelihoods, however, does not simply increase or decrease the overall urban quality of life. The integrated assessment of all indicators identifies environmental and social opportunities, as well as the challenges a shrinking city is faced with.« less
Prospects of effective microorganisms technology in wastes treatment in Egypt
Shalaby, Emad A
2011-01-01
Sludge dewatering and treatment may cost as much as the wastewater treatment. Usually large proportion of the pollutants in wastewater is organic. They are attacked by saprophytic microorganisms, i.e. organisms that feed upon dead organic matter. Activity of organisms causes decomposition of organic matter and destroys them, where the bacteria convert the organic matter or other constituents in the wastewater to new cells, water, gases and other products. Demolition activities, including renovation/remodeling works and complete or selective removal/demolishing of existing structures either by man-made processes or by natural disasters, create an extensive amount of wastes. These demolition wastes are characterized as heterogeneous mixtures of building materials that are usually contaminated with chemicals and dirt. In developing countries, it is estimated that demolition wastes comprise 20% to 30% of the total annual solid wastes. In Egypt, the daily quantity of construction and demolition (C&D) waste has been estimated as 10 000 tones. That is equivalent to one third of the total daily municipal solid wastes generated per day in Egypt. The zabbaliin have since expanded their activities and now take the waste they collect back to their garbage villages where it is sorted into recyclable components: paper, plastics, rags, glass, metal and food. The food waste is fed to pigs and the other items are sold to recycling centers. This paper summarizes the wastewater and solid wastes management in Egypt now and future. PMID:23569767
An estimation framework for building information modeling (BIM)-based demolition waste by type.
Kim, Young-Chan; Hong, Won-Hwa; Park, Jae-Woo; Cha, Gi-Wook
2017-12-01
Most existing studies on demolition waste (DW) quantification do not have an official standard to estimate the amount and type of DW. Therefore, there are limitations in the existing literature for estimating DW with a consistent classification system. Building information modeling (BIM) is a technology that can generate and manage all the information required during the life cycle of a building, from design to demolition. Nevertheless, there has been a lack of research regarding its application to the demolition stage of a building. For an effective waste management plan, the estimation of the type and volume of DW should begin from the building design stage. However, the lack of tools hinders an early estimation. This study proposes a BIM-based framework that estimates DW in the early design stages, to achieve an effective and streamlined planning, processing, and management. Specifically, the input of construction materials in the Korean construction classification system and those in the BIM library were matched. Based on this matching integration, the estimates of DW by type were calculated by applying the weight/unit volume factors and the rates of DW volume change. To verify the framework, its operation was demonstrated by means of an actual BIM modeling and by comparing its results with those available in the literature. This study is expected to contribute not only to the estimation of DW at the building level, but also to the automated estimation of DW at the district level.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lottes, S.A.; Bojanowski, C.; Shen, J.
2012-04-09
The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. Themore » analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water effects on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to improve design allowing for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, CFD analysis of the operation of the wind tunnel in the TFHRC wind engineering laboratory. This quarterly report documents technical progress on the project tasks for the period of October through December 2011.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lottes, S.A.; Bojanowski, C.; Shen, J.
2012-06-28
The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. Themore » analysis methods employ well benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water effects on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to improve design allowing for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, CFD analysis of the operation of the wind tunnel in the TFHRC wind engineering laboratory. This quarterly report documents technical progress on the project tasks for the period of January through March 2012.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lottes, S.A.; Kulak, R.F.; Bojanowski, C.
2011-08-26
The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. Themore » analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water loads on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to assess them for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, vehicle stability under high wind loading, and the use of electromagnetic shock absorbers to improve vehicle stability under high wind conditions. This quarterly report documents technical progress on the project tasks for the period of April through June 2011.« less
Prefabricated/Precast Bridge Elements and Systems (PBES) for Off-System Bridges
DOT National Transportation Integrated Search
2012-08-01
The : Federal : Highway : Administrations : (FHWA) : Every : Day : Counts : initiative : aims : to : shorten : the : overall : project : delivery : time, : enhance : safety, : and : protect : the : environment : both : on : and : around : co...
DOT National Transportation Integrated Search
2014-01-01
The overall goal of this project is the experimental evaluation and design of unfilled and concrete-filled FRP : composite piles for load-bearing in bridges. This report covers Task 2, FRP Composite Pile Driving at the : Richmond-Dresden Bridge over ...
Implicit Knowledge of General Upper Secondary School in a Bridge-Building Project
ERIC Educational Resources Information Center
Rasmussen, Annette; Andreasen, Karen
2016-01-01
Bridge-building activities are practiced widely in the education systems of Europe. They are meant to bridge transitions between lower and upper secondary school and form a mandatory part of the youth guidance system in Denmark. By giving pupils the opportunity to experience the different educational context of upper secondary school,…
2013-01-03
Paleozoic rocks of the Wedowee Group. The Wedowee Group includes the Cragford phyllite, Cutnose gneiss, and other high-grade metamorphic and igneous rocks ...rary and not significant. No long-term impacts will occur. Air Quality: There will be temporary increased emissions from the use of equipment and...worker vehicles during the construction and demolition activities. Each type of equ ipment will be used briefly and will generate a very small amount
DOT National Transportation Integrated Search
2013-07-01
Many highway bridges are skewed and their behavior and corresponding design analysis need to be furthered to fully accomplish design objectives. This project used physical-test and detailed finite element analysis to better understand the behavior of...
Code of Federal Regulations, 2010 CFR
2010-04-01
... PROCEDURES Bridges on Federal Dams § 630.803 Procedures. A State's application to qualify a project under... part of the agency constructing the dam to provide such bridge or approach roads to satisfy a legal...
Code of Federal Regulations, 2011 CFR
2011-04-01
... PROCEDURES Bridges on Federal Dams § 630.803 Procedures. A State's application to qualify a project under... part of the agency constructing the dam to provide such bridge or approach roads to satisfy a legal...
1981-03-01
to retain some of its aesthetic quality. Important bridges were also being constructed outside of France. The Westminister Bridge (1738-50) was built... Legislative Session. It was eventually to connect the waters of Mobile Bay with the Coosa River at Wetumpka, and eventually with the Tennessee. The project...Bridge Act of 1927 were important legislative aids. The state act resulted in the construction of fifteen major bridges, including the attractive
Final Project Report for Award ER65581
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stoy, Paul C.
2017-07-13
The attached final project report describes contributions of Montana State University (MSU) to the project "Bridging land-surface fluxes and aerosol concentrations to triggering convective rainfall" (PI: Fuentes).
Dynamic bridge substructure evaluation and monitoring
DOT National Transportation Integrated Search
2005-09-01
This research project was funded to investigate the possibility that, by measuring and modeling the dynamic response characteristics of a bridge substructure, it might be possible to determine the condition and safety of the substructure and identify...
Unit 6, downstream from Ferndale Bridge Johnstown Local Flood ...
Unit 6, downstream from Ferndale Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Unit 5, upstream toward incline bridge Johnstown Local Flood ...
Unit 5, upstream toward incline bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Unit 2, downstream from Coppersdale Bridge Johnstown Local Flood ...
Unit 2, downstream from Coppersdale Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Behavior of micropiles in bridge bent applications.
DOT National Transportation Integrated Search
2010-12-01
This project concerned the behavior of micropiles under lateral loads. The North Carolina Department of Transportation was specifically interested in the use of micropiles to support bridge bents. In this configuration micropiles would be subjected t...
GFRP reinforced lightweight precast bridge deck.
DOT National Transportation Integrated Search
2011-03-01
The present research project investigates lightweight and normal weight concrete precast panels for highway : bridge decks. The deck panels are reinforced with Glass Fiber Reinforced Polymer (GFRP) bars. Due to the : lack of research on lightweight c...
Investigation of soluble salts on Kentucky bridges
DOT National Transportation Integrated Search
2003-01-01
Several state highway agencies are looking at ways to increase the durability of their bridge maintenance painting projects and are using/investigating various chemical neutralizers/soluble salt removers to preclude problems caused by soluble salts. ...
Caltrans bridge inspection aerial robot.
DOT National Transportation Integrated Search
2008-10-01
The California Department of Transportation (Caltrans) project resulted in the development of a twin-motor, : single duct, electric-powered Aerobot designed of carrying video cameras up to 200 feet in elevation to enable : close inspection of bridges...
Structural monitoring of Rigolets Pass Bridge.
DOT National Transportation Integrated Search
2009-10-01
The overall objective of this research project was to evaluate the structural behavior of prestressed highperformance : concrete (HPC) long-span bulb-tee girders utilized in Louisiana bridge construction. To : accomplish this objective, one span of t...
Postwar City: Importance of Recycling Construction and Demolition Waste
NASA Astrophysics Data System (ADS)
Al-Qaraghuli, Hanan; Alsayed, Yaman; Almoghazy, Ali
2017-10-01
Wars and armed conflicts have heavy tolls on the built environment when they take place in cities. It is not only restricted to the actually fighting which destroys or damages buildings and infrastructure, but the damage and destruction inflicts its impacts way beyond the cessation of military actions. They can even have another impact through physical segregation of city quarters through walls and checkpoints that complicates, or even terminates, mobility of citizens, goods, and services in the post-war scenario. The accumulation of debris in the streets often impedes the processes of rescue, distribution of aid and services, and other forms of city life as well. Also, the amount of effort and energy needed to remove those residual materials to their final dumping sites divert a lot of urgently needed resources. In this paper, the components of construction and demolition waste found in post-war cities are to be discussed, relating each one to its origins and potential reuses. Then the issues related to the management of construction waste and demolition debris resulting from military actions are to be discussed. First, an outlook is to be given on the historical example of Berlin and how the city was severely damaged during World War II, and how the reconstruction of the city was aided in part by the reuse of demolition debris. Then two more recent examples will be given, the cities of Baghdad in Iraq, and Homs in Syria. In Baghdad, though major military actions have ceased but not all rubble is cleared out, some security structures in the form of concrete walls separate the cities into quarters and impede city life and lie around as poorly allocated resource needed for reconstruction. While in the case of Homs, and the wider Syrian context, major military operations are still raging, making more pressure on the resources needed for reconstruction. This recycling of demolition debris can bring economic and social stability through the conservation of resources, creation of jobs, and - eventually - the stabilization of the society in the midst of an atrocious war. Suggestions for relevant solutions will be given in both cities.
Yuan, Hongping; Chini, Abdol R; Lu, Yujie; Shen, Liyin
2012-03-01
During the past few decades, construction and demolition (C&D) waste has received increasing attention from construction practitioners and researchers worldwide. A plethora of research regarding C&D waste management has been published in various academic journals. However, it has been determined that existing studies with respect to C&D waste reduction are mainly carried out from a static perspective, without considering the dynamic and interdependent nature of the whole waste reduction system. This might lead to misunderstanding about the actual effect of implementing any waste reduction strategies. Therefore, this research proposes a model that can serve as a decision support tool for projecting C&D waste reduction in line with the waste management situation of a given construction project, and more importantly, as a platform for simulating effects of various management strategies on C&D waste reduction. The research is conducted using system dynamics methodology, which is a systematic approach that deals with the complexity - interrelationships and dynamics - of any social, economic and managerial system. The dynamic model integrates major variables that affect C&D waste reduction. In this paper, seven causal loop diagrams that can deepen understanding about the feedback relationships underlying C&D waste reduction system are firstly presented. Then a stock-flow diagram is formulated by using software for system dynamics modeling. Finally, a case study is used to illustrate the validation and application of the proposed model. Results of the case study not only built confidence in the model so that it can be used for quantitative analysis, but also assessed and compared the effect of three designed policy scenarios on C&D waste reduction. One major contribution of this study is the development of a dynamic model for evaluating C&D waste reduction strategies under various scenarios, so that best management strategies could be identified before being implemented in practice. Copyright © 2011 Elsevier Ltd. All rights reserved.
Study on Construction Technology of Municipal Road and Bridge Concrete
NASA Astrophysics Data System (ADS)
Tang, Fuyong
2018-03-01
With the continuous development of social economy and the accelerating process of urbanization, municipal road and bridge projects have also shown a trend of rapid development. Municipal road and bridge work can fully reflect the economic and cultural development level of cities and is also an important symbol of urban development. As a basic material of construction, concrete is widely used in engineering construction. This article will analyze the municipal road and bridge concrete construction technology, put forward corresponding measures.
NASA Astrophysics Data System (ADS)
Bonifazi, Giuseppe; Picone, Nicoletta; Serranti, Silvia
2015-02-01
The reduction of EOL concrete disposal in landfills, together with a lower exploitation of primary raw materials, generates a strong interest to develop, set-up and apply innovative technologies to maximize Construction and Demolition Waste (C&DW) conversion into useful secondary raw materials. Such a goal can be reached starting from a punctual in-situ efficient characterization of the objects to dismantle in order to develop demolition actions aimed to set up innovative mechanical-physical processes to recover the different materials and products to recycle. In this paper an innovative recycling-oriented characterization strategy based on HyperSpectral Imaging (HSI) is described in order to identify aggregates and mortar in drill core samples from end-of-life concrete. To reach this goal, concrete drill cores from a demolition site were systematically investigated by HSI in the short wave infrared field (1000-2500 nm). Results obtained by the adoption of the HSI approach showed as this technology can be successfully applied to analyze quality and characteristics of C&DW before dismantling and as final product to reutilise after demolition-milling-classification actions. The proposed technique and the related recognition logics, through the spectral signature detection of finite physical domains (i.e. concrete slice and/or particle) of different nature and composition, allows; i) to develop characterization procedures able to quantitatively assess end-of-life concrete compositional/textural characteristics and ii) to set up innovative sorting strategies to qualify the different materials constituting drill core samples.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kopotic, James D.; Ferri, Mark S.; Buttram, Claude
The East Tennessee Technology Park (ETTP) is the site of five former gaseous diffusion plant (GDP) process buildings that were used to enrich uranium from 1945 to 1985. The process equipment in the original two buildings (K-25 and K-27) was used for the production of highly enriched uranium (HEU), while that in the three later buildings (K-29, K-31 and K-33) produced low enriched uranium (LEU). Equipment was contaminated primarily with uranium and to a lesser extent technetium (Tc). Decommissioning of the GDP process buildings has presented several unique challenges and produced many lessons-learned. Among these is the importance of good,more » up-front characterization in developing the best demolition approach. Also, chemical cleaning of process gas equipment and piping (PGE) prior to shutdown should be considered to minimize the amount of hold-up material that must be removed by demolition crews. Another lesson learned is to maintain shutdown buildings in a dry state to minimize structural degradation which can significantly complicate characterization, deactivation and demolition efforts. Perhaps the most important lesson learned is that decommissioning GDP process buildings is first and foremost a waste logistics challenge. Innovative solutions are required to effectively manage the sheer volume of waste generated from decontamination and demolition (D and D) of these enormous facilities. Finally, close coordination with Security is mandatory to effectively manage Special Nuclear Material (SNM) and classified equipment issues. (authors)« less
Air quality during demolition and recovery activities in post-Katrina New Orleans.
Ravikrishna, Raghunathan; Lee, Han-Woong; Mbuligwe, Stephen; Valsaraj, K T; Pardue, John H
2010-07-01
Air samples were collected during demolition and cleanup operations in the Lakeview district of New Orleans, Louisiana, USA, in late 2005 during the period immediately after Hurricane Katrina. Three different high-volume air samples were collected around waste collection areas that were created to temporarily hold the debris from the cleanup of residential properties in the area. Particulate concentrations were elevated and included crystalline fibers associated with asbestos. Metal concentrations on particulate matter resembled those measured in sediments deposited by floodwaters with the exception of Ba, which was elevated at all three locations. The highest organic contaminant concentration measured on particulates was the pesticide Ziram (Zinc, bis[diethylcarbamodithioato-S,S']-, [T-4]-) at 2,200 microg/g of particulate matter during sampling period 2. Ziram is used in latex paint, adhesives, caulking, and wallboard as a preservative. Fungal isolates developed from particulate air samples included species associated with disease including Aspergillus and Penicillium species. These data represent the most comprehensive assessment of demolition activities during the period immediately after Hurricane Katrina. Copyright (c) 2010 SETAC.
Unit 5, downstream from Hickory Street Bridge Johnstown Local ...
Unit 5, downstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Unit 6, downstream from Horner Street Bridge Johnstown Local ...
Unit 6, downstream from Horner Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Unit 3, downstream from Fourth Avenue Bridge Johnstown Local ...
Unit 3, downstream from Fourth Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Unit 4, upstream from Johns Street Bridge Johnstown Local ...
Unit 4, upstream from Johns Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Unit 5, downstream from Haynes Street Bridge Johnstown Local ...
Unit 5, downstream from Haynes Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Unit 4, downstream from Johns Street Bridge Johnstown Local ...
Unit 4, downstream from Johns Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Unit 4, downstream from First Street Bridge Johnstown Local ...
Unit 4, downstream from First Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Unit 6, upstream from Hickory Street Bridge Johnstown Local ...
Unit 6, upstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Self-Consolidating Concrete for Prestressed Bridge Girders
DOT National Transportation Integrated Search
2017-07-01
This document reports the findings of a research project designed to better understand material and structural performance of prestressed bridge girders made with Self-Consolidating Concrete (SCC) from Wisconsin. SCC has high potential to be used for...
Review Of ITS Benefits: Emerging Successes
DOT National Transportation Integrated Search
2001-01-01
This report presents the following three recent projects on load testing of geosynthetic-reinforced soil (GRS) bridge abutments and piers: a full-scale bridge pier load test conducted by the Turner-Fairbank Highway Research Center, Federal Highway Ad...
Framework for a comprehensive bridge management and information system.
DOT National Transportation Integrated Search
2011-11-01
"The purpose of this research project was to provide a framework for the development of a Bridge : Management Information System (BMIS). Researchers developed a synthesis of current BMIS development : activities and identified sources of data availab...
Realtime monitoring of bridge scour using remote monitoring technology
DOT National Transportation Integrated Search
2011-02-01
The research performed in this project focuses on the application of instruments including accelerometers : and tiltmeters to monitor bridge scour. First, two large scale laboratory experiments were performed. One : experiment is the simulation of a ...
Monitoring bridge scour using fiber optic sensors : research project capsule.
DOT National Transportation Integrated Search
2009-03-01
The interstate highway network is an : important national asset. Bridges : constituting critical nodes within : transportation networks are the : backbone of the transportation : infrastructure. It is well known that : scour is one of the major cours...
Research notes : faster load rating for steel truss bridges.
DOT National Transportation Integrated Search
2009-03-01
The Oregon Department of Transportation (ODOT) Bridge Engineering Section recently completed a project with Oregon State University to develop a viable, more cost-effective alternative to the manually collected field measurement procedure. The new me...
Expert Technical Committee : Bay Bridge Project Assessment meeting, January 6-8, 2005.
DOT National Transportation Integrated Search
2005-01-01
The Expert Technical Committee (ETC) was formed to provide an independent review and : assessment of the history and current status of the San Francisco-Oakland Bay Bridge East Span : Seismic Retrofit Cost Increases.
Evaluating Concrete Bridge Deck Performance
DOT National Transportation Integrated Search
2006-06-01
Since the service life of concrete bridge decks designed by traditional procedures is often shorter than desired, : their ability to withstand constant and heavy use in a variety of operating environments is of major concern. In : this project, the r...
Geospatial wetlands impacts and mitigation forecasting models.
DOT National Transportation Integrated Search
2017-06-30
The South Carolina Department of Transportation (SCDOT) develops near (3-5 years) and long (15- 20 years) range plans for road widening, alignment, bridge replacement, and new road construction. Each road/bridge project may impact wetlands or streams...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lottes, S. A.; Kulak, R. F.; Bojanowski, C.
2011-05-19
This project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at the Turner-Fairbank Highway Research Center for a period of five years, beginning in October 2010. The analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focusmore » of the project are wind and water loads on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to assess them for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, vehicle stability under high wind loading, and the use of electromagnetic shock absorbers to improve vehicle stability under high wind conditions. This quarterly report documents technical progress on the project tasks for the period of January through March 2011.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Susan Stacy; Hollie K. Gilbert
2005-02-01
Test Area North (TAN) was a site of the Aircraft Nuclear Propulsion (ANP) Project of the U.S. Air Force and the Atomic Energy Commission. Its Cold War mission was to develop a turbojet bomber propelled by nuclear power. The project was part of an arms race. Test activities took place in five areas at TAN. The Assembly & Maintenance area was a shop and hot cell complex. Nuclear tests ran at the Initial Engine Test area. Low-power test reactors operated at a third cluster. The fourth area was for Administration. A Flight Engine Test facility (hangar) was built to housemore » the anticipated nuclear-powered aircraft. Experiments between 1955-1961 proved that a nuclear reactor could power a jet engine, but President John F. Kennedy canceled the project in March 1961. ANP facilities were adapted for new reactor projects, the most important of which were Loss of Fluid Tests (LOFT), part of an international safety program for commercial power reactors. Other projects included NASA's Systems for Nuclear Auxiliary Power and storage of Three Mile Island meltdown debris. National missions for TAN in reactor research and safety research have expired; demolition of historic TAN buildings is underway.« less
2005-04-01
with a single demolition block charge of C4 (DODIC M023) as the donor charge. An M739 point- detonating fuze (DODIC N340) was installed in each round...All rounds contained a supplementary TNT charge in the fuze well below the M739 fuze (see Appendix A). Figure 3 shows the setup common for all the...Charge, demolition block, Comp C4, M112 MA-97A003-007A 16 1390010809447 N340 Fuze, point detonating, M739 MA-84B007-013 7 Notes: Drawn from Fort
10. SOUTHEAST EXTERIOR CORNER. During demolition large iron bars were ...
10. SOUTHEAST EXTERIOR CORNER. During demolition large iron bars were found embedded in the south brick walls about 11 courses above the water table. These were possibly used to secure the roof structure of a shed which housed the fire engine of the Relief Fire Company (see Articles of Agreement, 1815, papers of the Central Philadelphia Meeting), which specified that the Engine House was to be situated at the northeast corner of the lot. Perhaps at some later date the shed was moved. - Twelfth Street Meeting House, 20 South Twelfth Street, Philadelphia, Philadelphia County, PA
Overview regarding construction and demolition waste in Spain.
Rodríguez-Robles, Desirée; García-González, Julia; Juan-Valdés, Andrés; Morán-Del Pozo, Julia M; Guerra-Romero, M Ignacio
2015-01-01
The construction sector comprises a number of activities that may result in environmental impacts of considerable magnitude, waste generation being one of the major negative effects of this industry due to the large streams generated. Proper knowledge of the environmental problem caused by the sector is of great importance in order to achieve an effective waste management. Thus, this paper analyse the Spanish situation regarding construction and demolition waste (CDW) compared with other European Union countries; which sets out the current figures of the CDW scenario (legislation, generation, composition, treatment and market) as well as the difficulties encountered when handling this residue.
Performance of Rail Fastening Systems on an Open-Deck Bridge
DOT National Transportation Integrated Search
2018-02-01
Transportation Technology Center, Inc. (TTCI) monitored the performance of rail fasteners on an open-deck bridge and its approaches, located at Norfolk Southern Corporations (NS's) eastern mega site. The project was co-sponsored by the Federal Rai...
Terrestrial Laser Scanning-Based Bridge Structural Condition Assessment : Tech Transfer Summaries
DOT National Transportation Integrated Search
2016-05-01
Problem Statement : While several state departments of transportation (DOTs) have used : terrestrial laser scanning (TLS) in the project planning phase, limited : research has been conducted on employing laser scanners to detect : cracks for bridge c...
Analysis of curved weathering steel box girder bridges in fire : final report.
DOT National Transportation Integrated Search
2016-05-31
Box girder bridges are becoming more common because of their ease of construction, pleasing aesthetics, and serviceability. Projects with curved : configuration and long spans can especially benefit from these advantages. However, the industry lacks ...
Repair systems for deteriorated bridge piles : final report.
DOT National Transportation Integrated Search
2017-04-01
The objective of this research project is to develop a durable repair system for deteriorated steel bridge piles that : can be implemented without the need for dewatering. A rigorous survey of the relevant practice nationwide was : conducted to infor...
An expert system as applied to bridges : testing phase : final report.
DOT National Transportation Integrated Search
1991-01-01
This project concludes a four part study regarding the development of an expert system called DOBES, to form conclusions as to the disposition of older bridges. The options include replacement, rehabilitation, improvement, abandonment and routine mai...
Brittle-ductile transition of steel bridges, volume I : final report.
DOT National Transportation Integrated Search
1990-05-01
The transition behavior of bridge steels and weldments largely determines the ir toughness under : service loading rates and temperatures. Two aspects of the transition were investigated in this : project: The first was to develop a better understand...
Visual inspection & capacity assessment of earthquake damaged reinforced concrete bridge elements.
DOT National Transportation Integrated Search
2008-11-01
The overarching objective of this project was to produce standard procedures and associated training materials, for the conduct of post-earthquake visual inspection and capacity assessment of damaged reinforced concrete (RC) bridges where the procedu...
Bridging Cultures with Classroom Strategies.
ERIC Educational Resources Information Center
Rothstein-Fisch, Carrie; Greenfield, Patricia M.; Trumbull, Elise
1999-01-01
Collectivism, stressing family members' interdependence, is common to Latino cultures. In contrast, schools foster independence and individual achievement. To help teachers understand assumptions underlying these different values, the authors developed the "Bridging Cultures Project" as a research-based professional-development program.…
Code of Federal Regulations, 2010 CFR
2010-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.413 Funding. (a) Funds... the same period as funds apportioned for projects on the Federal-aid primary system. (b) The Federal...
Theoretical and field experimental evaluation of skewed modular slab bridges.
DOT National Transportation Integrated Search
2012-12-01
As a result of longitudinal cracking discovered in the concrete overlays of some recently-built skewed : bridges, the Maryland State Highway Administration (SHA) requested that this research project be : conducted for two purposes: (1) to determine t...
Multimedia package for LRFD concrete bridge design.
DOT National Transportation Integrated Search
2009-02-01
This Project developed a Load and Resistance Factor Design (LRFD) multimedia package to provide a practical introduction and an in-depth understanding of the technological advances in the design of concrete bridges. This package can be used to train ...
The rideability of a deflected bridge approach slab : research project capsule.
DOT National Transportation Integrated Search
2011-08-01
The Localized Roughness Index (LRI) is a parameter that was developed at the Louisiana : Transportation Research Center (LTRC) to quantify localized pavement distresses, such as : pavement surface dips and bumps, concrete slab joint faulting, bridge-...
Bridge deck concrete volume change : final contract report.
DOT National Transportation Integrated Search
2010-02-01
Concrete structures such as bridge decks, with large surface area relative to volume, shrink and crack, thus reducing service life performance and increasing operation costs. The project evaluated the early, first 24 hours, and long-term, 180 days, s...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilcox, Brian; May, Doug; Howlett, Don
2013-07-01
Whiteshell Laboratories (WL) is a nuclear research establishment owned by the Canadian government and operated by Atomic Energy of Canada Limited (AECL) since the early 1960's. WL is currently under a decommissioning license and the mandate is to remediate the nuclear legacy liabilities in a safe and cost effective manner. The WL Project is the first major nuclear decommissioning project in Canada. A major initiative underway is to decommission and demolish the main R and D Laboratory complex. The Building 300 R and D complex was constructed to accommodate laboratories and offices which were mainly used for research and developmentmore » associated with organic-cooled reactors, nuclear fuel waste management, reactor safety, advanced fuel cycles and other applications of nuclear energy. Building 300 is a three storey structure of approximately 16,000 m{sup 2}. In order to proceed with building demolition, the contaminated systems inside the building have to be characterized, removed, and the waste managed. There is a significant focus on volume reduction of radioactive waste for the WL project. The active ventilation system is one of the significant contaminated systems in Building 300 that requires decommissioning and removal. The active ventilation system was designed to manage hazardous fumes and radioactivity from ventilation devices (e.g., fume hoods, snorkels and glove boxes) and to prevent the escape of airborne hazardous material outside of the laboratory boundary in the event of an upset condition. The system includes over 200 ventilation devices and 32 active exhaust fan units and high efficiency particulate air (HEPA) filters. The strategy to remove the ventilation system was to work from the laboratory end back to the fan/filter system. Each ventilation duct was radiologically characterized. Fogging was used to minimize loose contamination. Sections of the duct were removed by various cutting methods and bagged for temporary storage prior to disposition. Maintenance of building heating, ventilation and air conditioning (HVAC) balancing was critical to ensure proper airflow and worker safety. Approximately 103 m{sup 3} of equipment and materials were recovered or generated by the project. Low level waste accounted for approximately 37.4 m{sup 3}. Where possible, ducting was free released for metal recycling. Contaminated ducts were compacted into B-1000 containers and stored in a Shielded Modular Above-Ground Storage Facility (SMAGS) on the WL site awaiting final disposition. The project is divided into three significant phases, with Phases 1 and 2 completed. Lessons learned during the execution of Phases 1 and 2 have been incorporated into the current ventilation removal. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lottes, S.A.; Kulak, R.F.; Bojanowski, C.
2011-12-09
The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. Themore » analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water effects on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to assess them for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, CFD analysis of the operation of the wind tunnel in the TFCHR wind engineering laboratory, vehicle stability under high wind loading, and the use of electromagnetic shock absorbers to improve vehicle stability under high wind conditions. This quarterly report documents technical progress on the project tasks for the period of July through September 2011.« less
About the history of sexuality.
Shorter, Edward
2007-03-01
About 50 years of demolition work, it's time now for a return to the grand syntheses. Two of the great syntheses of the 19th century have now been shattered. Marxism lies in fragments. And psychoanalysis has largely drifted outside of psychiatry to find a new and doubtless temporary home in departments of literary studies. To be sure, the third of the great syntheses, Darwin's theory of evolution, remains intact. But otherwise, as far as the eye can see, there is rubble. The time for new attempts at synthesis is now nigh. After decades of pioneering work in the neurosciences, the fundamental importance of brain biology in the human condition has now become evident. Surely one of the new syntheses will draw upon neurochemistry and neurophysiology, and it is to the great credit of the Hungarian neurosciences that pharmacologist Joseph Knoll has now ventured a first attempt. This attempt will be widely discussed and will form the platform for other work that may end up building firm bridges between "neuroenhancers" and behavior - and, what's more, to show how this relationship has shaped the evolution of thousands of years of human destiny, a great synthesis indeed.
Golden Gate Vanpool Demonstration Project
DOT National Transportation Integrated Search
1979-07-01
The report evaluates the Golden Gate Vanpool Demonstration Project activities begun in October 1977. The objective of the demonstration is to successfuly promote commuter ridesharing through vanpools. The project grantee, the Golden Gate Bridge, High...
NASA Astrophysics Data System (ADS)
Remillard, C. M.; Madden, M.; Favors, J.; Childs-Gleason, L.; Ross, K. W.; Rogers, L.; Ruiz, M. L.
2016-06-01
The NASA DEVELOP National Program bridges the gap between NASA Earth Science and society by building capacity in both participants and partner organizations that collaborate to conduct projects. These rapid feasibility projects highlight the capabilities of satellite and aerial Earth observations. Immersion of decision and policy makers in these feasibility projects increases awareness of the capabilities of Earth observations and contributes to the tools and resources available to support enhanced decision making. This paper will present the DEVELOP model, best practices, and two case studies, the Colombia Ecological Forecasting project and the Miami-Dade County Ecological Forecasting project, that showcase the successful adoption of tools and methods for decision making. Through over 90 projects each year, DEVELOP is always striving for the innovative, practical, and beneficial use of NASA Earth science data.
A literature survey on industrialized bridge construction.
DOT National Transportation Integrated Search
1972-01-01
The purpose of this survey was to aid the writer in understanding and retaining material in preparation for a project on the industrialization of bridge construction. However, it was believed that the results of the survey would be informative to oth...
Evaluation of experimental installation of silane treatment on bridges : final report.
DOT National Transportation Integrated Search
1988-04-01
In this project the effectiveness of silane-based chemicals as concrete sealants was evaluated for selected bridges throughout the state of Louisiana for a five-year period. The field evaluation was initiated after satisfactory results in the laborat...
Establishment of Maximum Voluntary Compressive Neck Tolerance Levels
2011-07-01
Bridges Casey Pirnstill Chris Burneka John Plaga Grant Roush Biosciences and Performance Division Vulnerability Analysis Branch July 2011...S) Michael Cote, John Buhrman, Nathaniel Bridges, Casey Pirnstill, Chris Burneka, John Plaga , Grant Roush 5d. PROJECT NUMBER OSMS 5e. TASK
Lightweight solid decks for movable bridges - phase II.
DOT National Transportation Integrated Search
2016-01-01
Movable bridges often include open grid steel deck for its light weight and ease of installation. These decks, however, suffer from poor rideability and high maintenance costs. The primary objective of this research project was to search for a new ge...
14. DETAIL VIEW OF SERVICE BRIDGE, SHOWING TRAVELLING CRANE AND ...
14. DETAIL VIEW OF SERVICE BRIDGE, SHOWING TRAVELLING CRANE AND TAINTER GATE PIER WITH RECESSES FOR EMERGENCY BULKHEADS AND BULKHEAD DOGGING DEVICES, LOOKING NORTHEAST - Upper Mississippi River 9-Foot Channel Project, Lock & Dam 26R, Alton, Madison County, IL
Integral abutment bridge for Louisiana's soft and stiff soils : tech summary.
DOT National Transportation Integrated Search
2016-03-01
In this project, fi eld-instrumentation, monitoring, and analyzing the design and : construction of full integral abutment bridges for Louisianas fi ne sand and silty sand : deposit and clay soil conditions were conducted. Comparison of results wa...
Integral abutment bridge for Louisiana's soft and stiff soils : Tech summary.
DOT National Transportation Integrated Search
2016-03-01
In this project, fi eld-instrumentation, monitoring, and analyzing the design and : construction of full integral abutment bridges for Louisianas fi ne sand and silty sand : deposit and clay soil conditions were conducted. Comparison of results wa...
Expansion joint noise reduction on the new Tacoma Narrows Bridge.
DOT National Transportation Integrated Search
2011-12-01
"Washington State Department of Transportation (WSDOT) responded to citizen complaints about expansion joint noise on the new Tacoma Narrows Bridge (TNB) by installing new wall coated in noise absorptive materials. The goal of the project was to redu...
A critical evaluation of bridge scour for Michigan specific conditions
DOT National Transportation Integrated Search
2011-02-01
The overall goal of this research was to improve MDOTs bridge scour prediction capability. In : an effort to achieve this goal, the research team evaluated scour prediction methods utilized by : state DOTs, conducted a field data collection project, ...
DOT National Transportation Integrated Search
2014-09-01
This project studied application of acoustic emission (AE) technology to perform structural : health monitoring of highway bridges. Highway bridges are a vital part of transportation : infrastructure and there is need for reliable non-destructive met...
DOT National Transportation Integrated Search
2016-07-01
Currently, the Louisiana Department of Transportation and Development (DOTD) : maintains approximately 200 miles of concrete safety walk barrier railing systems on : its bridges. Some of these vintage systems do not meet the current crash performance...