Sample records for bridge engineering

  1. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2013-10-01 2013-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  2. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  3. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2014-10-01 2014-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  4. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  5. 49 CFR 237.51 - Railroad bridge engineers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...

  6. A Hierarchical Analysis of Bridge Decision Makers ... The Role of New Technology Adoption in the Timber Bridge Market: Special Project

    Treesearch

    Robert L. Smith; Robert J. Bush; Daniel L. Schmoldt

    1995-01-01

    Bridge design engineers and local highway officials make bridge replacement decisions across the United States. The Analytical Hierarchy Process was used to characterize the bridge material selection decision of these individuals. State Department of Transportation engineers, private consulting engineers, and local highway officials were personally interviewed in...

  7. Structural characterization of UHPC waffle bridge deck and connections.

    DOT National Transportation Integrated Search

    2014-07-01

    The AASHTO strategic plan in 2005 for bridge engineering identified extending the service life of bridges and accelerating bridge : construction as two of the grand challenges in bridge engineering. These challenges have the objective of producing sa...

  8. Bridge resource program.

    DOT National Transportation Integrated Search

    2013-09-01

    The mission of Rutgers Universitys Center for Advanced Infrastructure and Transportation (CAIT) Bridge Resource Program (BRP) is to provide bridge engineering support to the New Jersey Department of Transportation (NJDOT)s Bridge Engineering an...

  9. A forecast of bridge engineering, 1980-2000.

    DOT National Transportation Integrated Search

    1979-01-01

    A three-pronged study was undertaken to forecast the nature of bridge engineering and construction for the years 1980 to 2000. First, the history of bridge engineering was explored to extrapolate likely future developments. Second, a detailed questio...

  10. Geotextile reinforced bridge approach embankment : Lake River Bridge : Malin Highway , Klamath County, Oregon : construction report.

    DOT National Transportation Integrated Search

    1993-03-01

    The transition from the roadway to the deck of a rigidly supported bridge is of concern to engineers and the travelling public. It is a common occurrence to feel a discontinuity between the roadway and bridge structure. Bridge engineers have tried to...

  11. Review on antibacterial characteristics of bridge engineering biomaterials.

    PubMed

    Zhao, Qing-Qing; Chen, Meng-Yao; He, Rui-Lin; Zhang, Zhong-Feng; Ashraf, Muhammad Aqeel

    2016-01-01

    This review summarizes the research on timber construction materials used in bridge construction. It focuses on the application of antiseptic treatments and the use of timber engineering materials in decks and bridges. This review also provides an overview on the future research and prospects of engineered timber materials.

  12. Using expert opinion to quantify accuracy and reliability of nondestructive evaluation on bridges.

    DOT National Transportation Integrated Search

    2015-08-01

    Bridge inspection is an important phase in bridge management. In 2009, a joint American Society of Civil : Engineers Structural Engineering Institute and AASHTO Ad-Hoc group was created to identify the issues : in bridge safety and to study current b...

  13. Photographic copy of drawing by Modjeski and Masters, Engineers of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. MAY 13, 2005 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUBSTRUCTURE, SHOWING STRUCTURE PLAN AND ELEVATION -2 AND TYPICAL SECTION THROUGH BRIDGE. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  14. Photographic copy of drawing by Modjeski and Masters, Engineers of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. MAY 13, 2005 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUPERSTRUCTURE, SHOWING STRUCTURE PLAN AND ELEVATION -2 AND TYPICAL SECTION THROUGH BRIDGE AT PIER I AND II. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  15. Photographic copy of drawing by Modjeski and Masters, Engineers of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. MAY 13, 2005 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUBSTRUCTURE, SHOWING GENERAL PLAN AND ELEVATION. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  16. 6. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1930, WHITE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1930, WHITE RIVER BRIDGE, ARKANSAS HIGHWAY COMMISSION, DWIGHT BLACKWOOD, CHAIRMAN, JUSTIN MATTHEWS, J. LAN WILLIAMS, J.S. PARKS, SAM J. WILSON, COMMISSIONERS, C.S. CHRISTIAN, STATE HIGHWAY ENGINEER, IRA HEDRICK, INC., CONSULTING ENGINEERS, PARHAM CONT. CO., CONTRACTOR' - Augusta Bridge, Spanning White River at Highway 64, Augusta, Woodruff County, AR

  17. Overview of the National Timber Bridge Inspection Study

    Treesearch

    James P. Wacker; Brian K. Brashaw; Frank Jalinoos

    2013-01-01

    As many engineers begin to implement life cycle cost analyses within the preliminary bridge design phase, there is a significant need for more reliable data on the expected service life of highway bridges. Many claims are being made about the expected longevity of concrete and steel bridges, but few are based on actual performance data. Because engineers are least...

  18. Design and performance verification of UHPC piles for deep foundations.

    DOT National Transportation Integrated Search

    2008-11-01

    The strategic plan for bridge engineering issued by AASHTO in 2005 identified extending the service life and optimizing structural : systems of bridges in the United States as two grand challenges in bridge engineering, with the objective of producin...

  19. Photographic copy of drawing by Modjeski and Masters, Engineers of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. MAY 13, 2005 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUBSTRUCTURE, SHOWING STRUCTURE PLAN AND ELEVATION -1. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  20. 23. Photocopy of 1979 engineering drawing. 'IN DEPTH BRIDGE INSPECTION, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Photocopy of 1979 engineering drawing. 'IN DEPTH BRIDGE INSPECTION, LEWISBURG, UNION COUNTY,' SHOWING FRAMING PLAN AND STRESS DIAGRAM. (Courtesy of the Pennsylvania Department of Transportation.) - St. Anthony Street Bridge, Spanning Buffalo Creek, Legislative Route 59024, Lewisburg, Union County, PA

  1. 23 CFR 650.809 - Movable span bridges.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... shall be selected wherever practicable. If there are social, economic, environmental or engineering reasons which favor the selection of a movable bridge, a cost benefit analysis to support the need for the...

  2. 23 CFR 650.809 - Movable span bridges.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... shall be selected wherever practicable. If there are social, economic, environmental or engineering reasons which favor the selection of a movable bridge, a cost benefit analysis to support the need for the...

  3. 23 CFR 650.809 - Movable span bridges.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... shall be selected wherever practicable. If there are social, economic, environmental or engineering reasons which favor the selection of a movable bridge, a cost benefit analysis to support the need for the...

  4. Synthesis and evaluation of the service limit state of engineered fills for bridge support.

    DOT National Transportation Integrated Search

    2016-02-02

    This report synthesizes the current service limit state (SLS) design and analyses of engineered fills for bridge support used as shallow foundations. The SLS for settlement and deformations of bridge supports are summarized. Extensive literature revi...

  5. 7. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1929, WHITE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1929, WHITE RIVER BRIDGE, BUILT BY ARKANSAS HIGHWAY COMMISSION, DWIGHT BLACKWOOD, CHAIRMAN, JUSTIN MATTHEWS, J. LAN WILLIAMS, J.S. PARKS, SAM J. WILSON, COMMISSIONERS, C.S. CHRISTIAN, STATE HIGHWAY ENGINEER, IRA HEDRICK, INC., CONSULTING ENGINEERS, LIST & WEATHERLY, CONSTRUCTION CO.' - Newport Bridge, Spanning White River at State Highway 14, Newport, Jackson County, AR

  6. Guardrails for use on historic bridges: volume 2--bridge deck overhang design.

    DOT National Transportation Integrated Search

    2016-11-01

    Bridges that are designated historic present a special challenge to bridge engineers whenever rehabilitation work or improvements are : made to the bridges. Federal and state laws protect historically significant bridges, and railings on these bridge...

  7. 36. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, June 1928 (original print located at Arizona Department of Transportation, Phoenix AZ) COMPLETION OF SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  8. 32. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, April 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION OF SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  9. CF60 Concrete Composition Design and Application on Fudiankou Xijiang Super Large Bridge

    NASA Astrophysics Data System (ADS)

    Qiu, Yi Mei; Wen, Sen Yuan; Chen, Jun Xiang

    2018-06-01

    Guangxi Wuzhou City Ring Road Fudiankou Xijiang super large bridge CF60 concrete is a new multi-phase composite high-performance concrete, this paper for the Fudiankou Xijiang bridge structure and characteristics of the project, in accordance with the principle of local materials and technical specification requirements, combined with the site conditions of CF60 engineering high performance concrete component materials, proportion and the technical performance, quantify the main physical and mechanical performance index. Analysis main influencing factors of the technical indicators, reasonable adjustment of concrete mix design parameters, and the use of technical means of admixture and multi-function composite admixture of concrete, obtain the optimal proportion of good work, process, mechanical properties stability and durability of engineering properties, recommend and verification of concrete mix; to explore the CF60 high performance concrete Soil in the Fudiankou Xijiang bridge application technology, detection and tracking the quality of concrete construction, concrete structure during the construction of the key technology and control points is proposed, evaluation of CF60 high performance concrete in the actual engineering application effect and benefit to ensure engineering quality of bridge structure and service life, and super long span bridge engineering construction to provide basis and reference.

  10. Photographic copy of drawing by Modjeski and Masters, Engineers of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. JUNE 30, 2004 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUPERSTRUCTURE, SHOWING SEQUENCE OF CONSTRUCTION – 16, STAGE 5 (PLACEMENT OF NEW DECK AND FLOOR SYSTEM) AND STAGE 6. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  11. Photographic copy of drawing by Modjeski and Masters, Engineers of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. JUNE 30, 2004 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUPERSTRUCTURE, SHOWING SEQUENCE OF CONSTRUCTION – 14, STAGE 3 – PHASE 1 AND STAGE 3 – PHASE 2. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  12. Photographic copy of drawing by Modjeski and Masters, Engineers of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. JUNE 30, 2004 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUPERSTRUCTURE, SHOWING SEQUENCE OF CONSTRUCTION – 13, STAGE 1 AND STAGE 2 – PHASE 1 AND STAGE 2 – PHASE 2. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  13. Photographic copy of drawing by Modjeski and Masters, Engineers of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. MAY 13, 2005 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUPERSTRUCTURE, SHOWING ELEVATION AND SECTIONS AT PIER I AND II AND GENERAL DETAILS – 1. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  14. Photographic copy of drawing by Modjeski and Masters, Engineers of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. JUNE 30, 2004 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUPERSTRUCTURE, SHOWING SEQUENCE OF CONSTRUCTION – 15, STAGE 4 AND STAGE 5 (DECK AND FLOOR SYSTEM REMOVAL). - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  15. 41. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, 12 September 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). INSERTION OF CENTER PIN. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  16. 37. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. July 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION ON THIRD PANEL OF NORTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  17. 31. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, April 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). INITIAL CONSTRUCTION ON SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  18. 40. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. July 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION OF NORTH ARM, FROM SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  19. 34. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. May 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION ON EIGHT PANEL OF SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  20. 33. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. May 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION OF SOUTH ARM, SHOWING ERECTION TRAVELER. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  1. Guardrails for use on historic bridges : volume 1--replacement strategies.

    DOT National Transportation Integrated Search

    2016-11-01

    Bridges that are designated historic present a special challenge to bridge engineers whenever rehabilitation work or improvements are : made to the bridges. Federal and state laws protect historically significant bridges, and railings on these bridge...

  2. 13. Photocopy of drawing (original in AMTRAK Engineering Department), Boston ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photocopy of drawing (original in AMTRAK Engineering Department), Boston Bridge Works, Inc., March 8, 1912 N. Y. N. H. & H. R. R. BRIDGE #214 SHORE LINE DIV. DETAILS OF SIDEWALK BKTS, SHOES, ROLLERS, ETC. - Ferry Street Railroad Bridge, Ferry Street over New Haven Railroad, New Haven, New Haven County, CT

  3. 38. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. July 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). VIEW FROM CANYON OF THIRD PANEL OF NORTH ARM UNDER CONSTRUCTION. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  4. 35. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, June 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). ELEVENTH (LAST) PANEL OF SOUTH ARM UNDER CONSTRUCTION, SHOWING ERECTION TRAVELER. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  5. 1. Photocopy of engineering drawing (original in the Office of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photocopy of engineering drawing (original in the Office of the Cuyahoga County Engineer)--1907 NORTH ROCKY RIVER BRIDGE--PROPOSED DESIGN--REINFORCED CONCRETE: AN ALTERNATIVE DESIGN FOR THE DETROIT AVENUE CROSSING - Rocky River Bridge, Spanning Beaver Dam River, Rocky River, Cuyahoga County, OH

  6. Inspection of the advanced engineered lumber railroad ties at the New Meadows Bridge.

    DOT National Transportation Integrated Search

    2009-01-01

    In 2003, Engineered Materials of Maine (EMM, Bangor, Maine) fabricated forty-eight : (48) 8-inch wide, 10-inch deep, 12-foot long Advanced Engineered Lumber (AEL) mixed : hardwood glue-laminated (glulam) railroad bridge ties. Over a two day period in...

  7. Newport Pell Bridge traffic and revenue study

    DOT National Transportation Integrated Search

    2010-01-12

    Jacobs Engineering conducted a traffic and toll revenue study for the Claiborne Pell Newport Bridge : (Newport Pell Bridge or Pell Bridge) upon the request of the Rhode Island Turnpike and Bridge : Authority (RITBA). This study is being c...

  8. 39. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. July 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). ASSEMBLY OF TRAVELER ON NORTH ARM, SHOWING TEMPORARY TIEBACKS AND ANCHORAGE ARMS. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  9. Managing Transitions, Building Bridges: An Evaluation of a Summer Bridge Program for African American Scientists and Engineers

    ERIC Educational Resources Information Center

    Johnson, Jennifer Michelle

    2016-01-01

    Purpose: This paper aims to highlight the potential of science, technology, engineering and mathematics (STEM) summer bridge programs to promote college persistence by fostering a positive science identity among participants that is culturally consistent with the values and experiences of African American students. Design/methodology/approach:…

  10. 23 CFR 650.809 - Movable span bridges.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Movable span bridges. 650.809 Section 650.809 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.809 Movable span bridges. A fixed bridge...

  11. 23 CFR 650.809 - Movable span bridges.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Movable span bridges. 650.809 Section 650.809 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.809 Movable span bridges. A fixed bridge...

  12. Bridges with Trigonometry Equals Engineering Achievement

    ERIC Educational Resources Information Center

    Gathing, Ahmed L.

    2011-01-01

    Exemplary and fun technology education classes in high schools are always welcome. The author introduces bridge building to his ninth graders and other students who comprise the Introduction to Engineering and Technology course within the first two months of the fall semester. In Georgia, Introduction to Engineering and Technology is the first of…

  13. 20. San FranciscoOakland Bay Bridge contract recipients, April 28, 1933, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. San Francisco-Oakland Bay Bridge contract recipients, April 28, 1933, photographer unknown. Standing, left to right: Edward J. Schneider, Columbia Steel Corporation; C.C. Horton, Healy-Tibbitts Construction Company; Henry J. Kaiser, Bridge Builders, Inc.; Albert Huber, Clinton Construction Company; Allan McDonald, Transbay Construction Company; C.C. Carleton, Chief, Division of Contracts and Rights of Way, California Department of Public Works. Seated, left to right: Henry J. Brunnier, Consulting Engineer, Member of Consulting Board, San Francisco-Oakland Bay Bridge; Charles E. Andrew, Bridge Engineer, San Francisco-Oakland Bay Bridge; Earl Lee Kelly, Director, California Department of Public Works; Harrison S. Robinson, President, Financial ... - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA

  14. 6. Photocopied December 1977, from loose original engineering drawing, Jervis ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photocopied December 1977, from loose original engineering drawing, Jervis Library. IRON PLATES OVER BRIDGE. - Old Croton Aqueduct, Sing Sing Kill Bridge, Spanning Aqueduct Street & Broadway, Ossining, Westchester County, NY

  15. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...

  16. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...

  17. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...

  18. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...

  19. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...

  20. A Hierarchical Model and Analysis of Factors Affecting the Adoption of Timber as a Bridge

    Treesearch

    Robert L. Smith; Robert J. Bush; Daniel L. Schmoldt

    1995-01-01

    The Analytical Hierarchy Process was used to characterize the bridge material selection decisions of highway engineers and local highway officials across the United States. State Department of Transportation engineers, private consulting engineers, and local highway officials were personally interviewed in Mississippi, Virginia, Washington, and Wisconsin to identify...

  1. 58. Photographic copy of original construction plan (St. Paul Engineer's ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. Photographic copy of original construction plan (St. Paul Engineer's Office, Wabasha St. Bridge, Plan of Masonry, February 1899); south abutment - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN

  2. A model study of bridge hydraulics

    DOT National Transportation Integrated Search

    2010-08-01

    Most flood studies in the United States use the Army Corps of Engineers HEC-RAS (Hydrologic Engineering : Centers River Analysis System) computer program. This study was carried out to compare results of HEC-RAS : bridge modeling with laboratory e...

  3. 23 CFR 650.407 - Application for bridge replacement or rehabilitation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Application for bridge replacement or rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.407 Application for bridge replacement or rehabilitation. (a) Agencies participate...

  4. 23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Procedures for bridge replacement and rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration...

  5. 23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Procedures for bridge replacement and rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration...

  6. 23 CFR 650.407 - Application for bridge replacement or rehabilitation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Application for bridge replacement or rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.407 Application for bridge replacement or rehabilitation. (a) Agencies participate...

  7. Bridge deterioration models to support Indiana's bridge management system.

    DOT National Transportation Integrated Search

    2016-02-01

    An effective bridge management system that is equipped with reliable deterioration models enables agency engineers to carry out : monitoring and long-term programming of bridge repair actions. At the project level, deterioration models help the agenc...

  8. Hierarchical analysis of bridge decision makers : the role of new technology adoption in the timber bridge market : special project fiscal year 1992

    DOT National Transportation Integrated Search

    1995-08-01

    Bridge design engineers and local highway officials make bridge replacement decisions across the : United States. The Analytical Hierarchy Process was used to characterize the bridge material selection : decision of these individuals. State Departmen...

  9. Engineering Design Processes in Seventh-Grade Classrooms: Bridging the Engineering Education Gap

    ERIC Educational Resources Information Center

    English, Lyn D.; Hudson, Peter B.; Dawes, Les

    2012-01-01

    This paper reports on some findings from the first year of a three-year longitudinal study, in which seventh- to ninth-graders were introduced to engineering education. Specifically, the paper addresses students' responses to an initial design activity involving bridge construction, which was implemented at the end of seventh grade. This paper…

  10. Engineering Habits of Mind… for Better or Worse?

    ERIC Educational Resources Information Center

    Hodgson, Dan; Cloran, Peter; Johnson, Rory

    2017-01-01

    Engineering Habits of Mind (EHoMs) were first introduced to a target group of Year 9 (age 14) students who the authors felt were disengaged with science, technology, and computing. These students were invited to take part in an engineering challenge with a school in Qatar. This involved making a bridge and rolling a marble over the bridge. The…

  11. Impacts of a Summer Bridge Program in Engineering on Student Retention and Graduation

    ERIC Educational Resources Information Center

    Cançado, Luciana; Reisel, John R.; Walker, Cindy M.

    2018-01-01

    A summer bridge program was developed in an engineering program to advance the preparation of incoming freshmen students, particularly with respect to their math course placement. The program was intended to raise the initial math course placement of students who otherwise would begin their engineering studies in courses below Calculus I. One…

  12. Information Geography: A Bridge between Engineering and the Social Sciences

    ERIC Educational Resources Information Center

    Paradiso, Maria

    2006-01-01

    This paper presents the metaphor of engineering and the social sciences located on either side of a chasm and connected by the bridge of information geography. Information geography is not an integral part of engineering and is a new field within geography, a social science discipline. The specialty of information geography is one of the newest in…

  13. Post-Earthquake Assessment of Nevada Bridges Using ShakeMap/ShakeCast

    DOT National Transportation Integrated Search

    2016-01-01

    Post-earthquake capacity of Nevada highway bridges is examined through a combination of engineering study and scenario earthquake evaluation. The study was undertaken by the University of Nevada Reno Department of Civil and Environmental Engineering ...

  14. 5. Photocopied December 1977, from loose original engineering drawing, Jervis ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photocopied December 1977, from loose original engineering drawing, Jervis Library. SECTION OF AQUEDUCT SHOWING CAST-IRON LINING AS USED OVER BRIDGES. - Old Croton Aqueduct, Sing Sing Kill Bridge, Spanning Aqueduct Street & Broadway, Ossining, Westchester County, NY

  15. Methods of modifying historic bridges for contemporary use.

    DOT National Transportation Integrated Search

    1980-01-01

    Studied by a team of experts in the fields of history, bridge engineering, architecture, and computer analysis were 21 old truss bridges of historical importance located in Virginia. These old bridges are narrow and have low load-carrying capacities,...

  16. 26. VIEW FROM EAST IN BRIDGE TENDER'S HOUSE, LEVERS FOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. VIEW FROM EAST IN BRIDGE TENDER'S HOUSE, LEVERS FOR GASOLINE ENGINE OPERATION FOR BRIDGE AND THEIR CONNECTIONS TO CONTROL RODS ON DOWNSTREAM SIDE OF SWING-SPAN; new bridge located in background - Tipers Bridge, Spanning Great Wicomico River at State Route 200, Kilmarnock, Lancaster County, VA

  17. A Hierarchical Analysis of Bridge Decision Makers; the Role of New Technology Adoption in the Timber Bridge Market: Special Project Fiscal Year 1992

    DOT National Transportation Integrated Search

    1995-08-01

    Bridge design engineers and local highway officials make bridge replacement decsions across the U.S. The Analytical Hierarchical Process was used to characterize the bridge material selection decisions of these individuals. State Departments of Trans...

  18. Superhydrophobic engineered cementitious composites for highway bridge applications : technology transfer and implementation.

    DOT National Transportation Integrated Search

    2013-09-01

    The strength and durability of highway bridges are two of the key components in maintaining a : high level of freight transportation capacity on the nations highways. Superhydrophobic : engineered cementitious composite (SECC) is a new advanced con...

  19. The effect of bridge deck design methodology on crack control.

    DOT National Transportation Integrated Search

    2010-01-30

    At present, the Idaho Transportation Department (ITD) Bridge Design Manual allows engineers to use the AASHTO empirical method to : design concrete bridge decks. However, the ITD Bridge Section would like to compare their design practices to those em...

  20. Bridge to Persistence: Interactions with Educators as Social Capital for Latina/o Engineering Majors

    ERIC Educational Resources Information Center

    Dika, Sandra L.; Martin, Julie P.

    2018-01-01

    This study employs the notion of bridging social capital to investigate the extent to which different forms and quantity of interactions with educators predict intentions to persist in engineering among a sample of Latina/o engineering majors from five public 4-year institutions in the United States. Different forms of capital were effective for…

  1. Development of an engineered cementitious composite to enhance bridge approach slab durability.

    DOT National Transportation Integrated Search

    2013-06-01

    The strength and durability of highway bridges are two of the key components in maintaining a : high level of freight transportation capacity on the nations highways. : The CFIRE project 04-09 demonstrated the feasibility of a new hybrid engineered...

  2. 18. Photocopy of a drawing (from the Corps of Engineers ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photocopy of a drawing (from the Corps of Engineers report, March 1979, plate 3) SECTION THROUGH BRIDGE 808 AND THE DAM - Wagamon Pond Dam & Bridge, Spanning Broadkill River at State Road No. 197 (Mulberry Street), Milton, Sussex County, DE

  3. PEER News

    Science.gov Websites

    home about peer news events research products laboratories publications nisee b.i.p. members Engineering Services is Hiring Bridge Design and Bridge Construction Engineers 05/16/18 - PEER Research Research Project Highlight: "Dissipative Base Connections for Moment Frame Structures in Airports and

  4. Full-Scale Testing of Thermoplastic Composite I-Beams for Bridges

    DTIC Science & Technology

    2017-06-01

    ER D C/ CE RL T R- 17 -1 8 ACSIM Technology Standards Group Full-Scale Testing of Thermoplastic Composite I-Beams for Bridges Co ns tr...default. ACSIM Technology Standards Group ERDC/CERL TR-17-18 June 2017 Full-Scale Testing of Thermoplastic Composite I-Beams for Bridges Ghassan... tests were con- ducted on commercially available, thermoplastic polymer composite I- beams at U.S. Army Corps of Engineers, Engineer Research and

  5. 23 CFR 661.47 - Can bridge maintenance be performed with IRRBP funds?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Can bridge maintenance be performed with IRRBP funds... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.47 Can bridge maintenance be performed with IRRBP funds? No. Bridge maintenance repairs, e.g., guard rail repair, deck repairs, repair of...

  6. 23 CFR 661.47 - Can bridge maintenance be performed with IRRBP funds?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.47 Can bridge maintenance be performed with IRRBP funds? No. Bridge maintenance repairs, e.g., guard rail repair, deck repairs, repair of... 23 Highways 1 2010-04-01 2010-04-01 false Can bridge maintenance be performed with IRRBP funds...

  7. Effects of Irregular Bridge Columns and Feasibility of Seismic Regularity

    NASA Astrophysics Data System (ADS)

    Thomas, Abey E.

    2018-05-01

    Bridges with unequal column height is one of the main irregularities in bridge design particularly while negotiating steep valleys, making the bridges vulnerable to seismic action. The desirable behaviour of bridge columns towards seismic loading is that, they should perform in a regular fashion, i.e. the capacity of each column should be utilized evenly. But, this type of behaviour is often missing when the column heights are unequal along the length of the bridge, allowing short columns to bear the maximum lateral load. In the present study, the effects of unequal column height on the global seismic performance of bridges are studied using pushover analysis. Codes such as CalTrans (Engineering service center, earthquake engineering branch, 2013) and EC-8 (EN 1998-2: design of structures for earthquake resistance. Part 2: bridges, European Committee for Standardization, Brussels, 2005) suggests seismic regularity criterion for achieving regular seismic performance level at all the bridge columns. The feasibility of adopting these seismic regularity criterions along with those mentioned in literatures will be assessed for bridges designed as per the Indian Standards in the present study.

  8. Supplement to the bridge resource program : state-of-the-art practices of mass concrete - a literature review.

    DOT National Transportation Integrated Search

    2013-09-01

    The mission of Rutgers Universitys Center for Advanced Infrastructure and Transportation (CAIT) Bridge Resource Program : (BRP) is to provide bridge engineering support to the New Jersey Department of Transportation (NJDOT)s Bridge : Engineerin...

  9. Evaluation of design methods to determine scour depths for bridge structures.

    DOT National Transportation Integrated Search

    2013-03-01

    Scour of bridge foundations is the most common cause of bridge failures. The overall goal of this project was to evaluate the applicability of the existing Hydraulic Engineering Circular (HEC-18) documents method to Louisiana bridges that are mostly ...

  10. Use of railroad flat cars for low-volume road bridges.

    DOT National Transportation Integrated Search

    1999-08-01

    In an attempt to solve the bridge problem faced by many county engineers, this : investigation focused on a low cost bridge alternative that consists of using railroad flatcars : (RRFC) as the bridge superstructure. The intent of this study was to de...

  11. Power supply circuit for an ion engine sequentially operated power inverters

    NASA Technical Reports Server (NTRS)

    Cardwell, Jr., Gilbert I. (Inventor)

    2000-01-01

    A power supply circuit for an ion engine suitable for a spacecraft has a voltage bus having input line and a return line. The power supply circuit includes a pulse width modulation circuit. A plurality of bridge inverter circuits is coupled to the bus and the pulse width modulation circuit. The pulse width modulation circuit generates operating signals having a variable duty cycle. Each bridge inverter has a primary winding and a secondary winding. Each secondary winding is coupled to a rectifier bridge. Each secondary winding is coupled in series with another of the plurality of rectifier bridges.

  12. 17. Photocopy of a drawing (from the Corps of Engineers ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photocopy of a drawing (from the Corps of Engineers report, March 1979, plate 2) FRONT ELEVATION AND PLAN VIEW OF BRIDGE 808 IN 1979 - Wagamon Pond Dam & Bridge, Spanning Broadkill River at State Road No. 197 (Mulberry Street), Milton, Sussex County, DE

  13. 2. Photocopied December 1977, from loose original engineering drawing, Jervis ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Photocopied December 1977, from loose original engineering drawing, Jervis Library. ELEVATIONS AND SECTIONS OF AQUEDUCT BRIDGE AT SING SING, SHOWING ALL THREE ARCHES, INCLUDING 88-FOOT ARCH. - Old Croton Aqueduct, Sing Sing Kill Bridge, Spanning Aqueduct Street & Broadway, Ossining, Westchester County, NY

  14. Reassembly of Point Pleasant Bridge : documentation of structural damage and identification of laboratory specimens

    DOT National Transportation Integrated Search

    1970-07-01

    The collapse of the Point Pleasant Bridge created many unique problems and posed many new questions to the bridge engineering profession. One question that was paramount was, "What caused the bridge to collapse?". Arrangements were made with the Corp...

  15. "Bridge #6 Rock Creek: Castiron 48" pipe lines to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    "Bridge #6 - Rock Creek: Cast-iron 48" pipe lines to Gravity - 1859." Construction photo of Pennsylvania Avenue Bridge, 1859. Photograph courtesy Washington Aqueduct Division, U.S. Army Corps of Engineers - Pennsylvania Avenue Bridge, Spanning Rock Creek & Potomac Parkway, Washington, District of Columbia, DC

  16. Civil engineering reference guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Merritt, F.S.

    1986-01-01

    The civil engineering reference guide contains the following: Structural theory. Structural steel design. Concrete design and construction. Wood design and construction. Bridge engineering. Geotechnical engineering. Water engineering. Environmental engineering. Surveying.

  17. Development and Evaluation of the Stingray, an Amphibious Maritime Interdiction Operations Unmanned Ground Vehicle

    DTIC Science & Technology

    2014-05-01

    of Ships], Charles Griffin and Company, London, 246-261 (1908). [6] Volpich, H. & Bridge, I . C., “Paddle Wheels Pt 1: Preliminary Model Experiments...Transactions of the Institution of Engineers and Shipbuilders in Scotland, 327-380 (1955). [7] Volpich, H. & Bridge, I . C., “Paddle Wheels...Bridge, I . C., “Paddle Wheels Pt III: Ship/Model Correlation,” Transactions of the Institution of Engineers and Shipbuilders in Scotland, 512-550

  18. Fifth National Seismic Conference on Bridges & Highways : innovations in earthquake engineering for highway structures

    DOT National Transportation Integrated Search

    2007-02-01

    This document is the conference program of the 5th National Seismic Conference on Bridges and Highways. The conference was held in San Francisco on September 18-20, 2006 and attracted over 300 engineers, academician, and students from around the worl...

  19. Progression into Engineering. Building Bridges between Education, Training and Employment.

    ERIC Educational Resources Information Center

    Evans, Karen; And Others

    This publication reports findings of a 12-month study of progression opportunities in engineering education and training, a study which explored ways of bridging the gap between skills and knowledge acquired through basic training and prevocational education and those required for progression to higher levels of occupational training and…

  20. 23 CFR 650.401 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.401 Purpose. The... Bridge Replacement and Rehabilitation Program in accordance with 23 U.S.C. 144. ...

  1. 25. VIEW EAST IN BRIDGE TENDER'S HOUSE, (left) ORIGINAL LEVERS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. VIEW EAST IN BRIDGE TENDER'S HOUSE, (left) ORIGINAL LEVERS FOR GASOLINE ENGINE OPERATION OF SWING-SPAN, (right) PANEL F ELECTRIC OPERATION OF GATES AND SWING-SPAN; new bridge located in background - Tipers Bridge, Spanning Great Wicomico River at State Route 200, Kilmarnock, Lancaster County, VA

  2. 46 CFR 113.35-17 - Vessels with navigating bridge control.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Vessels with navigating bridge control. 113.35-17 Section 113.35-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING... bridge control. Each vessel with navigating bridge throttle control must have a positive mechanical stop...

  3. 46 CFR 113.35-17 - Vessels with navigating bridge control.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Vessels with navigating bridge control. 113.35-17 Section 113.35-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING... bridge control. Each vessel with navigating bridge throttle control must have a positive mechanical stop...

  4. 46 CFR 113.35-17 - Vessels with navigating bridge control.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Vessels with navigating bridge control. 113.35-17 Section 113.35-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING... bridge control. Each vessel with navigating bridge throttle control must have a positive mechanical stop...

  5. Advanced bridge safety initiative, task 3 : slab bridge load rating using AASHTO methodology and finite element analysis - an analysis of 20 bridges.

    DOT National Transportation Integrated Search

    2011-12-01

    Current AASHTO provisions for the conventional load rating of flat slab bridges rely on the equivalent strip method : of analysis for determining live load effects, this is generally regarded as overly conservative by many professional : engineers. A...

  6. 49 CFR 237.131 - Design.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Design. 237.131 Section 237.131 Transportation... TRANSPORTATION BRIDGE SAFETY STANDARDS Repair and Modification of Bridges § 237.131 Design. Each repair or... component of a bridge shall be designed by a railroad bridge engineer. The design shall specify the manner...

  7. Compact valve actuation mechanism

    NASA Technical Reports Server (NTRS)

    Brogdon, James William (Inventor); Gill, David Keith (Inventor)

    2000-01-01

    A valve actuation device. The device may include a free floating valve bridge movably supported within a cavity in the engine housing. The bridge may be provided with a cavity and an orifice arrangement for pumping gases entrained with lubricating fluid toward the piston stems as the bridge reciprocates back and forth. The device may also include a rocker arm that has a U-shaped cross-sectional shape for receiving at least a portion of the valve bridge, valve stem valve spring and spring retainer therein. The rocker arm may be provided with lubrication passages for directing lubrication to the point wherein it is pivotally affixed to the engine housing.

  8. 18. Photocopy of drawing of bronze dedication plaque, circa 1903 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photocopy of drawing of bronze dedication plaque, circa 1903 (original drawing in possession of City Engineer's Office Grand Rapids, Michigan) DEDICATION PLAQUE. - Bridge Street Bridge, Spanning Grand River, Michigan & Bridge Streets, Grand Rapids, MI

  9. A study of accidents involving highway bridges.

    DOT National Transportation Integrated Search

    1971-01-01

    Accident reports, field evaluations, state police and highway engineer questionnaire replies, and other data sources were used to conduct a general study of accidents involving highway bridges in Virginia. The bridges included in the study were divid...

  10. Simple model of cable-stayed bridge deck subjected to static wind loading

    NASA Astrophysics Data System (ADS)

    Kang, Yi-Lung; Wang, Yang Cheng

    1997-05-01

    Cable-stayed bridges have been known since 18th century with aesthetics design. The structural system and the structural behavior are significantly different from those of continuous bridges. Compared to continuous bridge, cable- stayed bridges have more flexure bridge deck than those of continuous bridges.On the other hand, cable-stayed bridges have less stiffness to resist wind loading especially for lateral loads. The first considering of bridge engineering is safety. In 1940's, Tacoma Narrows Suspension Bridge destroyed by wind loading is a good example even though it is not a cable-stayed bridge. After the bridge was destroyed, a lot of research articles have been published regarding cable supported bridge subjected to wind loading. In recent days, high strength materials have been served. The bridge engineers use the advantages to expand the span length of cable-stayed bridges. Due to the span length increased and the use of high strength materials, cable- stayed bridges have more significant nonlinear behavior subjected to wind loading. In this paper, a slice bridge deck of cable-stayed bridge connected to internal support cables is considered. The deck has been considered to be subjected to lateral static wind loading. Since cables can not take compressive force, the deck has strongly nonlinear behavior even though the materials are linear elastic. Several primary load combinations have ben considered in this paper such as the bridge deck supposed to be moved horizontally without rotation or the bridge deck supposed to be moved horizontally with rotational deformation. The mathematical formulas and the numerical solutions are found and represented in graphical forms. The results can be provided to bridge designers and researchers for further study of this type of structure subjected to wind loading.

  11. Dynamic characterization and damage detection in the I-40 bridge over the Rio Grande

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farrar, C.R.; Baker, W.E.; Bell, T.M.

    In the 1960`s and 1970`s over 2500 bridges were built in the U.S. with a design similar to those on Interstate 40 over the Rio Grande in Albuquerque, New Mexico. These bridges were built without structural redundancy and typically have only two plate girders carrying the entire dead and live loads. Failure of either girder is assumed to produce catastrophic failure of the bridge, hence these bridges are referred to as fracture-critical bridges. The Federal Highway Administration (FHWA) and the National Science Foundation (NSF) have provided funds to New Mexico State University (NMSU) through the New Mexico State Highway andmore » Transportation Department (NMSH&TD) and The Alliance For Transportation Research (ATR) for evaluation and testing of the existing fracture critical bridges over the Rio Grande. Because the 1-40 bridges over the Rio Grande were to be razed during the summer of 1993, the investigators were able to introduce simulated fatigue cracks, similar to those observed in the field, into the structure in order to test various damage identification methods and to observe the changes in load paths through the structure caused by the cracking. To support this research effort, NMSU contracted Los Alamos National Laboratory (LANL) to perform experimental modal analyses, and to develop experimentally verified numerical models of the bridge. Scientists from the LANL`s Condensed Matter and Thermal Physics Group (P-10) applied state-of-the-art sensors and data acquisition software to the modal tests. Engineers from the LANL`s Advanced Engineering Technology Group (MEE-13) conducted ambient and forced vibration tests to verify detailed and simplified finite element models of the bridge. Forced vibration testing was done in conjunction with engineers from Sandia National Laboratory (SNL) who provided and operated a hydraulic shaker.« less

  12. Understanding Customer Product Choices: A Case Study Using the Analytical Hierarchy Process

    Treesearch

    Robert L. Smith; Robert J. Bush; Daniel L. Schmoldt

    1996-01-01

    The Analytical Hierarchy Process (AHP) was used to characterize the bridge material selection decisions of highway officials across the United States. Understanding product choices by utilizing the AHP allowed us to develop strategies for increasing the use of timber in bridge construction. State Department of Transportation engineers, private consulting engineers, and...

  13. Ground Vehicle Power and Mobility Overview - Germany Visit

    DTIC Science & Technology

    2011-11-10

    the current and future force Survivability Robotics – Intelligent Systems Vehicle Electronics & Architecture Fuel, Water, Bridging ...Test Cell • Engine Generator Test Lab • Full Vehicle Environmental Test Cell • Hybrid Electric Reconfigurable Moveable Integration Testbed (HERMIT...Converter Conducted competitive runoff evaluations on Bridging Boat engine candidates Completed independent durability assessment of OEM

  14. Bridging Water Resources Policy and Environmental Engineering in the Classroom at Cornell University

    NASA Astrophysics Data System (ADS)

    Walter, M. T.; Shaw, S. B.; Seifert, S.; Schwarz, T.

    2006-12-01

    Current university undergraduate students in environmental sciences and engineering are the next generation of environmental protection practitioners. Recognizing this, Cornell's Biological and Environmental Engineering department has developed a popular class, Watershed Engineering (BEE 473), specifically designed to bridge the too-common gap between water resources policy and state-of-art science and technology. Weekly homework assignments are to design real-life solutions to actual water resources problems, often with the objective of applying storm water policies to local situations. Where appropriate, usually in conjunction with recent amendments to the Federal Clean Water Act, this course introduces water resource protection tools and concepts developed in the Cornell Soil and Water Lab. Here we present several examples of how we build bridges between university classrooms and the complex world of water resources policy.

  15. 23 CFR 661.49 - Can IRRBP funds be spent on Interstate, State Highway, and Toll Road IRR bridges?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., and Toll Road IRR bridges? 661.49 Section 661.49 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.49 Can IRRBP funds be spent on Interstate, State Highway, and Toll Road IRR bridges? Yes. Interstate...

  16. 1. General view of bridge looking north. This is the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. General view of bridge looking north. This is the only suspension bridge in Cleveland. It was designed by Wilbur J. Watson and Associates, Consulting Engineers. Sections of the Wooden deck are missing, and the bridge is no longer used. - Sidaway Avenue Footbridge, Jackowo & Garden Valley neighborhood Vicinity, Cleveland, Cuyahoga County, OH

  17. Impact of the Shodan Computer Search Engine on Internet-facing Industrial Control System Devices

    DTIC Science & Technology

    2014-03-27

    bridge implementation. The transparent bridge is designed using a Raspberry Pi configured with Linux IPtables and bridge-utils to bridge the on board...Ethernet card and a second USB Ethernet adapter. A Raspberry Pi is a credit-card-sized single-board computer running a version of Debian Linux. There

  18. Simplified Analytical Model of a Covered Burr-Arch-Truss Timber Bridge

    Treesearch

    F. Fanous; D. Rammer; T. Wipf

    2013-01-01

    Due to the importance of historical timber covered bridges throughout history, their preservation is necessary. However, conducting an accurate structural evaluation of these types of bridges has always caused difficulties to bridge engineers. This paper summarizes an investigation that was sponsored by the Federal Highway Administration and the USDA Forest Products...

  19. Building Better Bridges into STEM: A Synthesis of 25 Years of Literature on STEM Summer Bridge Programs

    ERIC Educational Resources Information Center

    Ashley, Michael; Cooper, Katelyn M.; Cala, Jacqueline M.; Brownell, Sara E.

    2017-01-01

    Summer bridge programs are designed to help transition students into the college learning environment. Increasingly, bridge programs are being developed in science, technology, engineering, and mathematics (STEM) disciplines because of the rigorous content and lower student persistence in college STEM compared with other disciplines. However, to…

  20. 23 CFR 661.49 - Can IRRBP funds be spent on Interstate, State Highway, and Toll Road IRR bridges?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., and Toll Road IRR bridges? 661.49 Section 661.49 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.49 Can IRRBP funds be spent on Interstate, State Highway, and Toll Road IRR bridges? Yes. Interstate...

  1. Translating Climate Projections for Bridge Engineering

    NASA Astrophysics Data System (ADS)

    Anderson, C.; Takle, E. S.; Krajewski, W.; Mantilla, R.; Quintero, F.

    2015-12-01

    A bridge vulnerability pilot study was conducted by Iowa Department of Transportation (IADOT) as one of nineteen pilots supported by the Federal Highway Administration Climate Change Resilience Pilots. Our pilot study team consisted of the IADOT senior bridge engineer who is the preliminary design section leader as well as climate and hydrological scientists. The pilot project culminated in a visual graphic designed by the bridge engineer (Figure 1), and an evaluation framework for bridge engineering design. The framework has four stages. The first two stages evaluate the spatial and temporal resolution needed in climate projection data in order to be suitable for input to a hydrology model. The framework separates streamflow simulation error into errors from the streamflow model and from the coarseness of input weather data series. In the final two stages, the framework evaluates credibility of climate projection streamflow simulations. Using an empirically downscaled data set, projection streamflow is generated. Error is computed in two time frames: the training period of the empirical downscaling methodology, and an out-of-sample period. If large errors in projection streamflow were observed during the training period, it would indicate low accuracy and, therefore, low credibility. If large errors in streamflow were observed during the out-of-sample period, it would mean the approach may not include some causes of change and, therefore, the climate projections would have limited credibility for setting expectations for changes. We address uncertainty with confidence intervals on quantiles of streamflow discharge. The results show the 95% confidence intervals have significant overlap. Nevertheless, the use of confidence intervals enabled engineering judgement. In our discussions, we noted the consistency in direction of change across basins, though the flood mechanism was different across basins, and the high bound of bridge lifetime period quantiles exceeded that of the historical period. This suggested the change was not isolated, and it systemically altered the risk profile. One suggestion to incorporate engineering judgement was to consider degrees of vulnerability using the median discharge of the historical period and the upper bound discharge for the bridge lifetime period.

  2. 39. Photocopy of bridge drawing, 1923 (original in possession of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Photocopy of bridge drawing, 1923 (original in possession of Wilkes-Barre City Engineer's Office) STRESS SHEET TRUSS SPANS - South Street Bridge, Spans Pennsylvania Avenue, Wilkes-Barre Boulevard, Pocono Northeast Railroad, Wilkes-Barre, Luzerne County, PA

  3. Object Markers at Narrow Bridges on Low Volume Rural Roadways

    DOT National Transportation Integrated Search

    1998-09-01

    Bridges are a necessary part of any roadway system. Their construction requires a more sophisticated engineering design analysis and a higher construction cost than that for the roadways connecting them. Until relatively recently, bridge width on low...

  4. Instrumentation, monitoring, and modeling of the I-35W bridge.

    DOT National Transportation Integrated Search

    2012-08-01

    The new I-35W Bridge was instrumented incorporating "smart bridge technology" by Figg Engineering Group in : conjunction with Flatiron-Manson. The purpose of the instrumentation was to monitor the structure during service, : and to use this informati...

  5. 23 CFR 661.51 - Can IRRBP funds be used for the approach roadway to a bridge?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... bridge? 661.51 Section 661.51 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.51 Can IRRBP funds be used for the approach roadway to a bridge? (a) Yes, costs associated with approach roadway work, as defined in...

  6. 16. The Baltimore & Ohio R.R System, Division BaltimoreEast, Bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. The Baltimore & Ohio R.R System, Division Baltimore-East, Bridge No 13-A, Branch Philadelphia. Baltimore: Office of Engineer of Bridges, 1945. Copy of drawing located at the Baltimore County Department of Public Works, Towson, Maryland. - Allender Road Bridge, Spanning CSX Transportation railroad tracks at Allender Road, White Marsh, Baltimore County, MD

  7. 23 CFR 661.51 - Can IRRBP funds be used for the approach roadway to a bridge?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... bridge? 661.51 Section 661.51 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.51 Can IRRBP funds be used for the approach roadway to a bridge? (a) Yes, costs associated with approach roadway work, as defined in...

  8. Evaluation of abutment scour prediction equations with field data

    USGS Publications Warehouse

    Benedict, S.T.; Deshpande, N.; Aziz, N.M.

    2007-01-01

    The U.S. Geological Survey, in cooperation with FHWA, compared predicted abutment scour depths, computed with selected predictive equations, with field observations collected at 144 bridges in South Carolina and at eight bridges from the National Bridge Scour Database. Predictive equations published in the 4th edition of Evaluating Scour at Bridges (Hydraulic Engineering Circular 18) were used in this comparison, including the original Froehlich, the modified Froehlich, the Sturm, the Maryland, and the HIRE equations. The comparisons showed that most equations tended to provide conservative estimates of scour that at times were excessive (as large as 158 ft). Equations also produced underpredictions of scour, but with less frequency. Although the equations provide an important resource for evaluating abutment scour at bridges, the results of this investigation show the importance of using engineering judgment in conjunction with these equations.

  9. 5. HISTORIC PHOTOGRAPH OF FIRST CHRISTINE FALLS BRIDGE, BUILT BY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. HISTORIC PHOTOGRAPH OF FIRST CHRISTINE FALLS BRIDGE, BUILT BY U.S. ARMY CORPS OF ENGINEERS CA. 1908. PHOTOGRAPHER TAKEN 1911. MOUNT RAINIER NATIONAL PARK ARCHIVES - Christine Falls Bridge, Spanning Van Trump Creek on Nisqually Road, Longmire, Pierce County, WA

  10. Estimating the residual axial load capacity of flexure-dominated reinforced concrete bridge columns.

    DOT National Transportation Integrated Search

    2014-08-01

    Extreme events such as earthquakes have the potential to damage hundreds, if not thousands, of bridges on a : transportation network. Following an earthquake, the damaged bridges are inspected by engineers sequentially to : decide whether or not to c...

  11. 19. Photographer unknown, circa 1950 'THE LOOP OVER' BRIDGE WAS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photographer unknown, circa 1950 'THE LOOP OVER' BRIDGE WAS CONSTRUCTED ON NEWFOUND GAP ROAD TO REPLACE A SERIES OF DANGEROUS SWITCHBACKS. THIS ENGINEERING FEATURE QUICKLY BECAME A POPULAR TOURIST ATTRACTION. - Great Smoky Mountains National Park Roads & Bridges, Gatlinburg, Sevier County, TN

  12. 49 CFR 237.57 - Designations of individuals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Designations of individuals. 237.57 Section 237.57... § 237.57 Designations of individuals. Each track owner shall designate those individuals qualified as railroad bridge engineers, railroad bridge inspectors and railroad bridge supervisors. Each individual...

  13. A static analysis method for barge impact design of bridges with consideration of dynamic amplification : summary.

    DOT National Transportation Integrated Search

    2009-11-01

    Several hundred Florida bridges span waterways deep enough for barge traffic. To ensure a bridge is capable of withstanding the potential impact of a barge collision, engineers use design specifications recommended by the American Association of Stat...

  14. 23 CFR 661.41 - After a bridge project has been completed (either PE or construction) what happens with the...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false After a bridge project has been completed (either PE or... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.41 After a bridge project has been completed (either PE or construction) what happens with...

  15. 23 CFR 661.23 - How will a bridge project be programmed for funding once eligibility has been determined?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false How will a bridge project be programmed for funding once... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a bridge project be programmed for funding once eligibility has been determined? (a) All projects will be...

  16. Monitoring the performance of timber bridges over the long term

    Treesearch

    James P. Wacker; Marc R. Joyal; Joseph F. Murphy; Xiping Wang

    2007-01-01

    Timber bridges are often viewed by engineers as less durable than steel or concrete structures. However, they remain a durable and economical option along secondary roads in many rural areas of the country. With well over 75,000 bridges listed by the Federal Highway Administration’s National Bridge Inventory as having timber superstructures as of 2002, they represent...

  17. 23 CFR 661.23 - How will a bridge project be programmed for funding once eligibility has been determined?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false How will a bridge project be programmed for funding once... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a bridge project be programmed for funding once eligibility has been determined? (a) All projects will be...

  18. 23 CFR 661.41 - After a bridge project has been completed (either PE or construction) what happens with the...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false After a bridge project has been completed (either PE or... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.41 After a bridge project has been completed (either PE or construction) what happens with...

  19. Assessment of Factors Impacting Success for Incoming College Engineering Students in a Summer Bridge Program

    ERIC Educational Resources Information Center

    Reisel, John R.; Jablonski, Marissa; Hosseini, Hossein; Munson, Ethan

    2012-01-01

    A summer bridge program for incoming engineering and computer science freshmen has been used at the University of Wisconsin-Milwaukee from 2007 to 2010. The primary purpose of this program has been to improve the mathematics course placement for incoming students who initially place into a course below Calculus I on the math placement examination.…

  20. 46 CFR 112.43-7 - Navigating bridge distribution panel.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Navigating bridge distribution panel. 112.43-7 Section 112.43-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Lighting Systems § 112.43-7 Navigating bridge distribution...

  1. 46 CFR 112.43-7 - Navigating bridge distribution panel.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Navigating bridge distribution panel. 112.43-7 Section 112.43-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Lighting Systems § 112.43-7 Navigating bridge distribution...

  2. 46 CFR 112.43-7 - Navigating bridge distribution panel.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Navigating bridge distribution panel. 112.43-7 Section 112.43-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Lighting Systems § 112.43-7 Navigating bridge distribution...

  3. Virtual Bridge Design Challenge

    ERIC Educational Resources Information Center

    Mitts, Charles R.

    2013-01-01

    This design/problem-solving activity challenges students to design a replacement bridge for one that has been designated as either structurally deficient or functionally obsolete. The Aycock MS Technology/STEM Magnet Program Virtual Bridge Design Challenge is an authentic introduction to the engineering design process. It is a socially relevant…

  4. 23 CFR 661.59 - What should be done with a deficient BIA owned IRR bridge if the Indian Tribe does not support...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... bridge if the Indian Tribe does not support the project? 661.59 Section 661.59 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.59 What should be done with a deficient BIA owned IRR bridge if the Indian Tribe does not...

  5. 27. RAILROAD, RR. BRIDGE MISSISSIPPI, CLAY CO. WAVERLY 1.5 mi. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. RAILROAD, RR. BRIDGE MISSISSIPPI, CLAY CO. WAVERLY 1.5 mi. S of MS. 50 Stress Sheet of 1888 Bridge: Conroy & Sinks, Consulting Engineers, Chicago. July 21, 1910. DWG #978. Act. size around border: 18x11 in. Credit: Columbus and Greenville RR, Columbus, Ms. Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Columbus, Lowndes County, MS

  6. 23 CFR 661.59 - What should be done with a deficient BIA owned IRR bridge if the Indian Tribe does not support...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... bridge if the Indian Tribe does not support the project? 661.59 Section 661.59 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.59 What should be done with a deficient BIA owned IRR bridge if the Indian Tribe does not...

  7. Advanced bridge safety initiative, task 1 : development of improved analytical load rating procedures for flat-slab concrete bridges - a thesis and guidelines.

    DOT National Transportation Integrated Search

    2010-01-01

    Current AASHTO provisions for the conventional load rating of flat slab bridges rely on the equivalent strip method : of analysis for determining live load effects, this is generally regarded as overly conservative by many professional : engineers. A...

  8. Reverse engineering of mandible and prosthetic framework: Effect of titanium implants in conjunction with titanium milled full arch bridge prostheses on the biomechanics of the mandible.

    PubMed

    De Santis, Roberto; Gloria, Antonio; Russo, Teresa; D'Amora, Ugo; Varriale, Angelo; Veltri, Mario; Balleri, Piero; Mollica, Francesco; Riccitiello, Francesco; Ambrosio, Luigi

    2014-12-18

    This study aimed at investigating the effects of titanium implants and different configurations of full-arch prostheses on the biomechanics of edentulous mandibles. Reverse engineered, composite, anisotropic, edentulous mandibles made of a poly(methylmethacrylate) core and a glass fibre reinforced outer shell were rapid prototyped and instrumented with strain gauges. Brånemark implants RP platforms in conjunction with titanium Procera one-piece or two-piece bridges were used to simulate oral rehabilitations. A lateral load through the gonion regions was used to test the biomechanical effects of the rehabilitations. In addition, strains due to misfit of the one-piece titanium bridge were compared to those produced by one-piece cast gold bridges. Milled titanium bridges had a better fit than cast gold bridges. The stress distribution in mandibular bone rehabilitated with a one-piece bridge was more perturbed than that observed with a two-piece bridge. In particular the former induced a stress concentration and stress shielding in the molar and symphysis regions, while for the latter design these stresses were strongly reduced. In conclusion, prosthetic frameworks changed the biomechanics of the mandible as a result of both their design and manufacturing technology. Copyright © 2014 Elsevier Ltd. All rights reserved.

  9. 33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...

  10. 33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...

  11. 33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...

  12. 33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...

  13. 33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...

  14. A distributed cloud-based cyberinfrastructure framework for integrated bridge monitoring

    NASA Astrophysics Data System (ADS)

    Jeong, Seongwoon; Hou, Rui; Lynch, Jerome P.; Sohn, Hoon; Law, Kincho H.

    2017-04-01

    This paper describes a cloud-based cyberinfrastructure framework for the management of the diverse data involved in bridge monitoring. Bridge monitoring involves various hardware systems, software tools and laborious activities that include, for examples, a structural health monitoring (SHM), sensor network, engineering analysis programs and visual inspection. Very often, these monitoring systems, tools and activities are not coordinated, and the collected information are not shared. A well-designed integrated data management framework can support the effective use of the data and, thereby, enhance bridge management and maintenance operations. The cloud-based cyberinfrastructure framework presented herein is designed to manage not only sensor measurement data acquired from the SHM system, but also other relevant information, such as bridge engineering model and traffic videos, in an integrated manner. For the scalability and flexibility, cloud computing services and distributed database systems are employed. The information stored can be accessed through standard web interfaces. For demonstration, the cyberinfrastructure system is implemented for the monitoring of the bridges located along the I-275 Corridor in the state of Michigan.

  15. Strengthening steel bridge girders using CFRP.

    DOT National Transportation Integrated Search

    2010-06-01

    While traditional retrofitting methods for steel bridge girders could be time consuming and uneconomical, an alternative repair method is suggested using Carbon Fiber Reinforced Polymers (CFRP) laminate strips, providing engineers with a competitive ...

  16. 24. Photocopy of photograph appearing in August, 1928 issue of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. Photocopy of photograph appearing in August, 1928 issue of the Reading Railroad Magazine. Caption reads: 'Harrisburg Division--Engine & Crew On A New Bridge Along the Steelton Branch.' From its appearance, this bridge (now demolished) is obviously another example of the Reading-Halls Bridge design. Note the bents used to support the trusses at points between the bridge abutments, enabling the bridge to carry loads far heavier than any it was designed to bear in the mid-nineteenth century. - Reading-Halls Station Bridge, U.S. Route 220, spanning railroad near Halls Station, Muncy, Lycoming County, PA

  17. Assuring bridge safety and serviceability in Europe

    DOT National Transportation Integrated Search

    2010-08-01

    U.S. engineers need advanced tools and protocols to better assess and assure safety and serviceability of bridges. The Federal Highway Administration, American Association of State Highway and Transportation Officials, and National Cooperative Highwa...

  18. Performance Evaluation of an Intel Haswell- and Ivy Bridge-Based Supercomputer Using Scientific and Engineering Applications

    NASA Technical Reports Server (NTRS)

    Saini, Subhash; Hood, Robert T.; Chang, Johnny; Baron, John

    2016-01-01

    We present a performance evaluation conducted on a production supercomputer of the Intel Xeon Processor E5- 2680v3, a twelve-core implementation of the fourth-generation Haswell architecture, and compare it with Intel Xeon Processor E5-2680v2, an Ivy Bridge implementation of the third-generation Sandy Bridge architecture. Several new architectural features have been incorporated in Haswell including improvements in all levels of the memory hierarchy as well as improvements to vector instructions and power management. We critically evaluate these new features of Haswell and compare with Ivy Bridge using several low-level benchmarks including subset of HPCC, HPCG and four full-scale scientific and engineering applications. We also present a model to predict the performance of HPCG and Cart3D within 5%, and Overflow within 10% accuracy.

  19. 16. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, California, A.J. Logan, County Surveyor, H.J. Brunnier, Consulting Engineer, March 7, 1919,' showing detail of floor beam at central pier, half section of cantilever slab at end of bridge, floor beam end panels, slab reinforcing, plan of slab reinforcing, diagram of slab bars, typical floor girder. - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA

  20. Comparative durability of timber bridges in the USA

    Treesearch

    James P. Wacker; Brian K. Brashaw

    2017-01-01

    As engineers begin to utilize life-cycle-cost design approaches for timber bridges, there is a necessity for more reliable data about their durability and expected service life. This paper summarizes a comprehensive effort to assess the current condition of more than one hundred timber highway bridge superstructures throughout the United States. This national study was...

  1. Overview of the national historic covered bridge preservation (NHCBP) program

    Treesearch

    James P. Wacker; Sheila Rimal Duwadi

    2010-01-01

    Covered wooden bridges proliferated in the United States in the mid-nineteenth century. Today an estimated 800 covered bridge structures remain, but they are nevertheless cherished links to the technological heritage of the United States. The through-truss designs vary from the Kingpost trusses built in the craft tradition to the engineered Burr arch and Paddleford...

  2. 17. "Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. "Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, California, A.J. Logan, County Surveyor, H.J. Brunnier, Consulting Engineer, March 7, 1919," showing plan of bars in top flange, elevation of girder reinforcement, plan of bars in bottom flange - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA

  3. 15. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, California, A.J. Logan, County Surveyor, H.J. Brunnier, Consulting Engineer, March 7, 1919,' showing general plan, plan of top chord, elevation of main girder, transverse section, plan section at deck level. - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA

  4. 18. "Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. "Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, California, A.J. Logan, County Surveyor, H.J. Brunnier, Consulting Engineer, March 7, 1919," showing elevation of center pier, elevation and plan of north and south abutments, sections of abutments, pier, and pier footings - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA

  5. The Case for Summer Bridge: Building Social and Cultural Capital for Talented Black STEM Students

    ERIC Educational Resources Information Center

    Stolle-McAllister, Kathleen

    2011-01-01

    This study uses focus groups to examine the importance of a pre-college summer bridge program for highly talented black students in science, technology, engineering, and mathematics (STEM). Longitudinal data were collected from 134 participants who identified three aspects of Summer Bridge that were particularly helpful: academic, social, and…

  6. Service life assessment of timber highway bridges in USA climate zones

    Treesearch

    James P. Wacker; Brian K. Brashaw; Thomas G. Williamson; P. David Jones; Matthew S. Smith; Travis K. Hosteng; David L. Strahl; Lola E. Coombe; V.J. Gopu

    2014-01-01

    As engineers begin to estimate life-cycle costs and sustainable design approaches for timber bridges, there is a need for more reliable data about their durability and expected service life. This paper summarizes a comprehensive effort to assess the current condition of more than one hundred timber highway bridge superstructures throughout the United States. This...

  7. KSC-00pp0503

    NASA Image and Video Library

    2000-04-14

    Center Director Roy Bridges (left) dons protective apron, gloves and face shield before the "ribbon-breaking" to open the new Cryogenic Testbed Facility. Part of the normal ceremonial ribbon was replaced with plastic tubing and frozen in liquid nitrogen for the event. Bridges hit the tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor

  8. KSC-00pp0504

    NASA Image and Video Library

    2000-04-14

    Center Director Roy Bridges (left), wearing protective apron, gloves and face shield, watches as liquid nitrogen is poured into a container to freeze the plastic tubing for a special "ribbon-breaking" to open the new Cryogenic Testbed Facility. Bridges hit the section of tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor

  9. KSC-00pp0506

    NASA Image and Video Library

    2000-04-14

    Center Director Roy Bridges (center) is congratulated for the successful breaking of the ceremonial "ribbon" and the opening of the new Cryogenic Testbed Facility. Part of the normal ribbon was replaced with plastic tubing and frozen in liquid nitrogen for the event. Bridges hit the tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor

  10. 6. Photocopy of photograph (Original print in possession of the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photocopy of photograph (Original print in possession of the Division of Mechanical and Civil Engineering, Smithsonian Institute) SIMILAR BRIDGE IN FRAMINGHAM MASSACHUSETTS - Elm Street Bridge, Spanning Ottauquechee River, Woodstock, Windsor County, VT

  11. 7. Photocopy of photograph (original in possession of the Division ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of photograph (original in possession of the Division of Mechanical and Civil Engineering, Smithsonian Institute) PARKER TRUSS BRIDGE IN MAINE - Elm Street Bridge, Spanning Ottauquechee River, Woodstock, Windsor County, VT

  12. 8. Photocopy of photograph (Original in possesssion of the Division ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photocopy of photograph (Original in possesssion of the Division of Mechanical and Cicil Engineering, Smithsonian Institute) PARKER TRUSS BRIDGE IN NORTHFIELD, VT - Elm Street Bridge, Spanning Ottauquechee River, Woodstock, Windsor County, VT

  13. Selling Technical Sales to Engineering Learners

    ERIC Educational Resources Information Center

    Bumblauskas, Daniel P.; Carberry, Adam R.; Sly, David P.

    2017-01-01

    Sales engineering or technical sales programs bridge engineering and business to educate engineering students in sales specific to their discipline. Students develop business awareness through such programs, providing the sales workforce with technically knowledgeable salespeople. The following study analyzed cohorts of students enrolled in a…

  14. 48 CFR 31.105 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-engineer contracts. 31.105 Section 31.105 Federal Acquisition Regulations System FEDERAL ACQUISITION... Construction and architect-engineer contracts. (a) This category includes all contracts and contract..., bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to...

  15. 48 CFR 31.105 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-engineer contracts. 31.105 Section 31.105 Federal Acquisition Regulations System FEDERAL ACQUISITION... Construction and architect-engineer contracts. (a) This category includes all contracts and contract..., bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to...

  16. 48 CFR 31.105 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-engineer contracts. 31.105 Section 31.105 Federal Acquisition Regulations System FEDERAL ACQUISITION... Construction and architect-engineer contracts. (a) This category includes all contracts and contract..., bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to...

  17. 48 CFR 31.105 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-engineer contracts. 31.105 Section 31.105 Federal Acquisition Regulations System FEDERAL ACQUISITION... Construction and architect-engineer contracts. (a) This category includes all contracts and contract..., bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to...

  18. MCEER, from Earthquake Engineering to Extreme Events | Home Page

    Science.gov Websites

    Center Report Series Education Education Home Bridge Engineering Guest Speaker Series Connecte²d Teaching CSEE Graduate Student Poster Competition Earthquake Engineering Education in Haiti Earthquakes : FAQ's Engineering Seminar Series K-12 STEM Education National Engineers Week Research Experiences for

  19. Inventory and Evaluation of Engineering Cultural Resources: Montgomery to Gadsden, Alabama Coosa River, Alabama,

    DTIC Science & Technology

    1981-03-01

    to retain some of its aesthetic quality. Important bridges were also being constructed outside of France. The Westminister Bridge (1738-50) was built... Legislative Session. It was eventually to connect the waters of Mobile Bay with the Coosa River at Wetumpka, and eventually with the Tennessee. The project...Bridge Act of 1927 were important legislative aids. The state act resulted in the construction of fifteen major bridges, including the attractive

  20. Application of Composite Structures in Bridge Engineering. Problems of Construction Process and Strength Analysis

    NASA Astrophysics Data System (ADS)

    Flaga, Kazimierz; Furtak, Kazimierz

    2015-03-01

    Steel-concrete composite structures have been used in bridge engineering from decades. This is due to rational utilisation of the strength properties of the two materials. At the same time, the reinforced concrete (or prestressed) deck slab is more favourable than the orthotropic steel plate used in steel bridges (higher mass, better vibration damping, longer life). The most commonly found in practice are composite girder bridges, particularly in highway bridges of small and medium spans, but the spans may reach over 200 m. In larger spans steel truss girders are applied. Bridge composite structures are also employed in cable-stayed bridge decks of the main girder spans of the order of 600, 800 m. The aim of the article is to present the cionstruction process and strength analysis problems concerning of this type of structures. Much attention is paid to the design and calculation of the shear connectors characteristic for the discussed objects. The authors focused mainly on the issues of single composite structures. The effect of assembly states on the stresses and strains in composite members are highlighted. A separate part of problems is devoted to the influence of rheological factors, i.e. concrete shrinkage and creep, as well as thermal factors on the stresses and strains and redistribution of internal forces.

  1. FY82 Posture Report.

    DTIC Science & Technology

    1982-01-01

    illustrate MERADCOM’s missio and continued growth as an independent subordinate Command. MERADCOM- DIVERSIFCATION IN SCIECE AND ENGINEERING COUNETEREIEE...Magnetic Signature Duplicator!1 Pre- staged Ammo Loading System Portable Mine Neutralization SystemN;- . Heavy Assault Bridge Composite Bridge Components

  2. Suspension Bridges: A Merger of Physics, Engineering, and Art

    ERIC Educational Resources Information Center

    Greenslade, Thomas B., Jr.

    1974-01-01

    Discusses the physical principles underlying the design of a small scale suspension bridge, including its types and strength calculations. Included are the working equation and two formulas for determining the load per unit length. (CC)

  3. Research notes : faster load rating for steel truss bridges.

    DOT National Transportation Integrated Search

    2009-03-01

    The Oregon Department of Transportation (ODOT) Bridge Engineering Section recently completed a project with Oregon State University to develop a viable, more cost-effective alternative to the manually collected field measurement procedure. The new me...

  4. Axle equivalent transverse loading on segmental bridge decks.

    DOT National Transportation Integrated Search

    2014-04-01

    For a prestressed concrete segmental box girder bridge, both design and load rating are determined by : longitudinal and transverse analyses. A transverse analysis is performed for the top slab, typically by : using Homberg charts (an engineers de...

  5. 23 CFR 661.23 - How will a bridge project be programmed for funding once eligibility has been determined?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false How will a bridge project be programmed for funding once eligibility has been determined? 661.23 Section 661.23 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a...

  6. 23 CFR 661.23 - How will a bridge project be programmed for funding once eligibility has been determined?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false How will a bridge project be programmed for funding once eligibility has been determined? 661.23 Section 661.23 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a...

  7. 23 CFR 661.23 - How will a bridge project be programmed for funding once eligibility has been determined?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false How will a bridge project be programmed for funding once eligibility has been determined? 661.23 Section 661.23 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a...

  8. Final Environmental Assessment, Horse Creek Bridge Replacement

    DTIC Science & Technology

    2010-10-01

    Final Environmental Assessment Horse Creek Bridge Replacement 78th Civil Engineer Group...Final Environmental Assessment Horse Creek Bridge Replacement 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d...Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 FINDING OF NO SIGNIFICANT IMPACT (FONSI)/ FINDING OF NO PRACTICABLE ALTERNATIVE (FONP A) HORSE

  9. Study on Construction Technology of Municipal Road and Bridge Concrete

    NASA Astrophysics Data System (ADS)

    Tang, Fuyong

    2018-03-01

    With the continuous development of social economy and the accelerating process of urbanization, municipal road and bridge projects have also shown a trend of rapid development. Municipal road and bridge work can fully reflect the economic and cultural development level of cities and is also an important symbol of urban development. As a basic material of construction, concrete is widely used in engineering construction. This article will analyze the municipal road and bridge concrete construction technology, put forward corresponding measures.

  10. Assessing the vulnerability of Delaware's coastal bridges to hurricane forces.

    DOT National Transportation Integrated Search

    2008-01-01

    There exists a need for new guidelines to address the threat of hurricane : forces to coastal bridges. Researchers at the University of Florida, Ocean Engineering : Associates, Inc., Modjeski and Masters, Inc., Moffatt & Nichol, and the Federal : Hig...

  11. 11. DETAIL VIEW OF WELDED DATES 1896/1941 (S.E. CORNER) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. DETAIL VIEW OF WELDED DATES - 1896/1941 (S.E. CORNER) 3 Photocopies of drawings labeled 'Bridge Rating Program by Boswell Engineering Company - Abbett Avenue Bridge, Spanning Whippany River at Abbett Avenue, Morristown, Morris County, NJ

  12. 23 CFR 650.413 - Funding.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.413 Funding. (a) Funds... the same period as funds apportioned for projects on the Federal-aid primary system. (b) The Federal...

  13. 23 CFR 650.803 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Policy. 650.803 Section 650.803 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND... and vehicular protective and warning systems on bridges subject to ship collisions. ...

  14. Total surface selective removal of concrete utilizing hydrodemolition.

    DOT National Transportation Integrated Search

    2014-07-01

    As an engineer with the Missouri Department of Transportation, spending over 26 years in field : bridge maintenance and inspection, I have had the chance to participate in the evaluation of : many products and processes related to bridge repairs. Wit...

  15. Theoretical mechanics: crowd synchrony on the Millennium Bridge.

    PubMed

    Strogatz, Steven H; Abrams, Daniel M; McRobie, Allan; Eckhardt, Bruno; Ott, Edward

    2005-11-03

    Soon after the crowd streamed on to London's Millennium Bridge on the day it opened, the bridge started to sway from side to side: many pedestrians fell spontaneously into step with the bridge's vibrations, inadvertently amplifying them. Here we model this unexpected and now notorious phenomenon--which was not due to the bridge's innovative design as was first thought--by adapting ideas originally developed to describe the collective synchronization of biological oscillators such as neurons and fireflies. Our approach should help engineers to estimate the damping needed to stabilize other exceptionally crowded footbridges against synchronous lateral excitation by pedestrians.

  16. 15. Photocopy of drawing, truss elevations, Bridge No. 79B, Main ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photocopy of drawing, truss elevations, Bridge No. 79B, Main & Washington Sts., So. Norwalk, Ct., N. Y. Division, N.Y., N.H. and H.R.R., dated April 21, 1895. Original on file with Construction Management and Facilities Engineering Department, Metro North Commuter Railroad, 420 Lexington Avenue, New York, N.Y. - South Norwalk Railroad Bridge, South Main & Washington Streets, Norwalk, Fairfield County, CT

  17. 1. Front view of steam engine and mill, looking NE, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Front view of steam engine and mill, looking NE, showing (l to r) 6-column beam engine, flywheel, reduction gears and 3-roll cane mill. - Hacienda Azucarera La Esperanza, Steam Engine & Mill, 2.65 Mi. N of PR Rt. 2 Bridge over Manati River, Manati, Manati Municipio, PR

  18. From Bridges and Rockets, Lessons for Software Systems

    NASA Technical Reports Server (NTRS)

    Holloway, C. Michael

    2004-01-01

    Although differences exist between building software systems and building physical structures such as bridges and rockets, enough similarities exist that software engineers can learn lessons from failures in traditional engineering disciplines. This paper draws lessons from two well-known failures the collapse of the Tacoma Narrows Bridge in 1940 and the destruction of the space shuttle Challenger in 1986 and applies these lessons to software system development. The following specific applications are made: (1) the verification and validation of a software system should not be based on a single method, or a single style of methods; (2) the tendency to embrace the latest fad should be overcome; and (3) the introduction of software control into safety-critical systems should be done cautiously.

  19. Replication of engine block cylinder bridge microstructure and mechanical properties with lab scale 319 Al alloy billet castings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lombardi, A., E-mail: a2lombar@ryerson.ca; D'Elia, F.; Ravindran, C.

    2014-01-15

    In recent years, aluminum alloy gasoline engine blocks have in large part successfully replaced nodular cast iron engine blocks, resulting in improved vehicle fuel efficiency. However, because of the inadequate wear resistance properties of hypoeutectic Al–Si alloys, gray iron cylinder liners are required. These liners cause the development of large tensile residual stress along the cylinder bores and necessitate the maximization of mechanical properties in this region to prevent premature engine failure. The aim of this study was to replicate the engine cylinder bridge microstructure and mechanical properties following TSR treatment (which removes the sand binder to enable easy castingmore » retrieval) using lab scale billet castings of the same alloy composition with varying cooling rates. Comparisons in microstructure between the engine block and the billet castings were carried out using optical and scanning electron microscopy, while mechanical properties were assessed using tensile testing. The results suggest that the microstructure at the top and middle of the engine block cylinder bridge was successfully replicated by the billet castings. However, the microstructure at the bottom of the cylinder was not completely replicated due to variations in secondary phase morphology and distribution. The successful replication of engine block microstructure will enable the future optimization of heat treatment parameters. - Highlights: • A method to replicate engine block microstructure was developed. • Billet castings will allow cost effective optimization of heat treatment process. • The replication of microstructure in the cylinder region was mostly successful. • Porosity was more clustered in the billet castings compared to the engine block. • Mechanical properties were lower in billet castings due to porosity and inclusions.« less

  20. Rural roads and bridges : condition and status of roads

    DOT National Transportation Integrated Search

    1996-09-01

    Report examines the conditions of roads and bridges maintained by local governments. It is based on 609 responses from towns and 1961 from counties to mailed survey questionnaires in country engineers and town/township governments in Fall 1994 and Sp...

  1. Effect of design parameters on the dynamic response of bridges.

    DOT National Transportation Integrated Search

    2000-06-01

    Engineers and researchers have long recognized the importance of vehicle-induced vibration with regard to the response and service life of bridges. In spite of the recognition of the importance and role of dynamic response in deterioration and fatigu...

  2. 23 CFR 650.301 - Purpose.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Purpose. 650.301 Section 650.301 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... national standards for the proper safety inspection and evaluation of all highway bridges in accordance...

  3. 23 CFR 650.301 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Purpose. 650.301 Section 650.301 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... national standards for the proper safety inspection and evaluation of all highway bridges in accordance...

  4. 23 CFR 650.301 - Purpose.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Purpose. 650.301 Section 650.301 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... national standards for the proper safety inspection and evaluation of all highway bridges in accordance...

  5. 23 CFR 650.301 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Purpose. 650.301 Section 650.301 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... national standards for the proper safety inspection and evaluation of all highway bridges in accordance...

  6. 23 CFR 650.301 - Purpose.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Purpose. 650.301 Section 650.301 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... national standards for the proper safety inspection and evaluation of all highway bridges in accordance...

  7. BATS IN AMERICAN BRIDGES: RESOURCE PUBLICATION NO. 4

    DOT National Transportation Integrated Search

    1999-01-01

    Bridges and culverts were evaluated as bat roosting habitat in 25 states at elevations from sea level to 10,000 feet. Field surveys were conducted at 2,421 highway structures. Scientific literature was reviewed, and local biologists and engineers wer...

  8. 23 CFR 661.21 - When is a bridge eligible for rehabilitation?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Section 661.21 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND... eligible for rehabilitation may be replaced if the life cycle cost analysis is conducted which shows the cost for bridge rehabilitation exceeds the replacement cost. ...

  9. 23 CFR 661.21 - When is a bridge eligible for rehabilitation?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Section 661.21 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND... eligible for rehabilitation may be replaced if the life cycle cost analysis is conducted which shows the cost for bridge rehabilitation exceeds the replacement cost. ...

  10. 23 CFR 661.21 - When is a bridge eligible for rehabilitation?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Section 661.21 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND... eligible for rehabilitation may be replaced if the life cycle cost analysis is conducted which shows the cost for bridge rehabilitation exceeds the replacement cost. ...

  11. A survey of waterproofing membrane systems for bridge decks.

    DOT National Transportation Integrated Search

    1972-01-01

    This survey was concerned with only a few of the many waterproof systems available for sealing concrete bridge decks, and made use of personal contacts with engineers of other highway agencies. The information gathered indicated that there were sever...

  12. Bridge deck cracking and composite action analyses : final report, March 2010.

    DOT National Transportation Integrated Search

    2010-03-01

    According to the American Society of Civil Engineers Report Card (ASCE, 2005), United States infrastructure received a grade point average of "D"(i.e., poor rating) in 2005. Moreover, the National Bridge Inventory (Federal Highway Administration, 200...

  13. 23 CFR 650.413 - Funding.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Funding. 650.413 Section 650.413 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.413 Funding. (a) Funds...

  14. 23 CFR 650.413 - Funding.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Funding. 650.413 Section 650.413 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.413 Funding. (a) Funds...

  15. 23 CFR 650.413 - Funding.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Funding. 650.413 Section 650.413 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.413 Funding. (a) Funds...

  16. 23 CFR 650.413 - Funding.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Funding. 650.413 Section 650.413 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.413 Funding. (a) Funds...

  17. FHWA study tour for advanced composites in bridges in Europe and Japan

    DOT National Transportation Integrated Search

    1997-10-01

    Under the Federal Highway Administration's (FHWA) International Technology Scanning Program, a team of 13 U.S. bridge engineers and advanced composite experts from Federal and State transportation agencies, academia, and industry conducted a 2-week s...

  18. Developing Engineering and Science Process Skills Using Design Software in an Elementary Education

    NASA Astrophysics Data System (ADS)

    Fusco, Christopher

    This paper examines the development of process skills through an engineering design approach to instruction in an elementary lesson that combines Science, Technology, Engineering, and Math (STEM). The study took place with 25 fifth graders in a public, suburban school district. Students worked in groups of five to design and construct model bridges based on research involving bridge building design software. The assessment was framed around individual student success as well as overall group processing skills. These skills were assessed through an engineering design packet rubric (student work), student surveys of learning gains, observation field notes, and pre- and post-assessment data. The results indicate that students can successfully utilize design software to inform constructions of model bridges, develop science process skills through problem based learning, and understand academic concepts through a design project. The final result of this study shows that design engineering is effective for developing cooperative learning skills. The study suggests that an engineering program offered as an elective or as part of the mandatory curriculum could be beneficial for developing students' critical thinking, inter- and intra-personal skills, along with an increased their understanding and awareness for scientific phenomena. In conclusion, combining a design approach to instruction with STEM can increase efficiency in these areas, generate meaningful learning, and influence student attitudes throughout their education.

  19. Bridge condition assessment based on long-term strain monitoring

    NASA Astrophysics Data System (ADS)

    Sun, LiMin; Sun, Shouwang

    2011-04-01

    In consideration of the important role that bridges play as transportation infrastructures, their safety, durability and serviceability have always been deeply concerned. Structural Health Monitoring Systems (SHMS) have been installed to many long-span bridges to provide bridge engineers with the information needed in making rational decisions for maintenance. However, SHMS also confronted bridge engineers with the challenge of efficient use of monitoring data. Thus, methodologies which are robust to random disturbance and sensitive to damage become a subject on which many researches in structural condition assessment concentrate. In this study, an innovative probabilistic approach for condition assessment of bridge structures was proposed on the basis of long-term strain monitoring on steel girder of a cable-stayed bridge. First, the methodology of damage detection in the vicinity of monitoring point using strain-based indices was investigated. Then, the composition of strain response of bridge under operational loads was analyzed. Thirdly, the influence of temperature and wind on strains was eliminated and thus strain fluctuation under vehicle loads is obtained. Finally, damage evolution assessment was carried out based on the statistical characteristics of rain-flow cycles derived from the strain fluctuation under vehicle loads. The research conducted indicates that the methodology proposed is qualified for structural condition assessment so far as the following respects are concerned: (a) capability of revealing structural deterioration; (b) immunity to the influence of environmental variation; (c) adaptability to the random characteristic exhibited by long-term monitoring data. Further examination of the applicability of the proposed methodology in aging bridge may provide a more convincing validation.

  20. Experimental and Analytical Seismic Studies of a Four-Span Bridge System with Innovative Materials

    NASA Astrophysics Data System (ADS)

    Cruz Noguez, Carlos Alonso

    As part of a multi-university project utilizing the NSF Network for Earthquake Engineering Simulation (NEES), a quarter-scale model of a four-span bridge incorporating plastic hinges with different advanced materials was tested to failure on the three shake table system at the University of Nevada, Reno (UNR). The bridge was the second test model in a series of three 4-span bridges, with the first model being a conventional reinforced-concrete (RC) structure. The purpose of incorporating advanced materials was to improve the seismic performance of the bridge with respect to two damage indicators: (1) column damage and (2) permanent deformations. The goals of the study presented in this document were to (1) evaluate the seismic performance of a 4-span bridge system incorporating SMA/ECC and built-in rubber pad plastic hinges as well as post-tensioned piers, (2) quantify the relative merit of these advanced materials and details compared to each other and to conventional reinforced concrete plastic hinges, (3) determine the influence of abutment-superstructure interaction on the response, (4) examine the ability of available elaborate analytical modeling techniques to model the performance of advanced materials and details, and (5) conduct an extensive parametric study of different variations of the bridge model to study several important issues in bridge earthquake engineering. The bridge model included six columns, each pair of which utilized a different advanced detail at bottom plastic hinges: shape memory alloys (SMA), special engineered cementitious composites (ECC), elastomeric pads embedded into columns, and post-tensioning tendons. The design of the columns, location of the bents, and selection of the loading protocol were based on pre-test analyses conducted using computer program OpenSees. The bridge model was subjected to two-horizontal components of simulated earthquake records of the 1994 Northridge earthquake. Over 340 channels of data were collected. The test results showed the effectiveness of the advanced materials in reducing damage and permanent displacements. The damage was minimal in plastic hinges with SMA/ECC and those with built-in elastomeric pads. Conventional RC plastic hinges were severely damaged due to spalling of concrete and rupture of the longitudinal and transverse reinforcement. Extensive post-test analytical studies were conducted and it was determined that a computational model of the bridge that included bridge-abutment interaction using OpenSees was able to provide satisfactory estimations of key structural parameters such as superstructure displacements and base shears. The analytical model was also used to conduct parametric studies on single-column and bridge-system response under near-fault ground motions. The effects of vertical excitations and transverse shear-keys at the bridge abutments on the superstructure displacement and column drifts were also explored.

  1. Effective Sealing and Monitoring of Small Movement Expansion Joints in Connecticut Bridges

    DOT National Transportation Integrated Search

    2017-03-01

    One in nine bridges in the United States is rated as structurally deficient by the 2013 Infrastructure Report Card published by the American Society of Civil Engineers. One of the primary degradation factors that contribute to compromising the struct...

  2. 23 CFR 630.802 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Applicability. 630.802 Section 630.802 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PRECONSTRUCTION PROCEDURES Bridges on Federal Dams § 630.802 Applicability. A proposed bridge over a dam, together with the...

  3. 23 CFR 630.802 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Applicability. 630.802 Section 630.802 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PRECONSTRUCTION PROCEDURES Bridges on Federal Dams § 630.802 Applicability. A proposed bridge over a dam, together with the...

  4. Autonomous measurements of bridge pier and abutment scour using motion-sensing radio transmitters.

    DOT National Transportation Integrated Search

    2010-01-01

    Two portable Radio Frequency IDentification (RFID) systems (made by Texas Instruments and HiTAG) were developed and tested for bridge scour monitoring by the Department of Civil and Environmental Engineering at the University of Iowa. Both systems co...

  5. Repairing/strengthening of bridges with post-tensioned FRP strands and performance evaluation.

    DOT National Transportation Integrated Search

    2008-06-01

    The proposed project is to take advantage of some new developments in bridge engineering to apply fiber reinforced polymers (FRP) post-tensioning strands on a selected structure. The use of externally post-tensioned FRP strands to repair/strengthen b...

  6. 23 CFR 650.303 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Applicability. 650.303 Section 650.303 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... Inspection Standards (NBIS) in this subpart apply to all structures defined as highway bridges located on all...

  7. 23 CFR 650.303 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Applicability. 650.303 Section 650.303 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... Inspection Standards (NBIS) in this subpart apply to all structures defined as highway bridges located on all...

  8. 23 CFR 650.303 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Applicability. 650.303 Section 650.303 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... Inspection Standards (NBIS) in this subpart apply to all structures defined as highway bridges located on all...

  9. 23 CFR 650.303 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Applicability. 650.303 Section 650.303 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... Inspection Standards (NBIS) in this subpart apply to all structures defined as highway bridges located on all...

  10. 23 CFR 650.303 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Applicability. 650.303 Section 650.303 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... Inspection Standards (NBIS) in this subpart apply to all structures defined as highway bridges located on all...

  11. Standards for single span prefabricated bridges : phase I - concept development.

    DOT National Transportation Integrated Search

    2014-07-01

    In coordination with a Technical Advisory Committee (TAC) consisting of County : Engineers and Iowa DOT representatives, the Iowa DOT has proposed to develop a set : of standards for a single span prefabricated bridge system for use on the local road...

  12. Integrating modal-based NDE techniques and bridge management systems using quality management

    NASA Astrophysics Data System (ADS)

    Sikorsky, Charles S.

    1997-05-01

    The intent of bridge management systems is to help engineers and managers determine when and where to spend bridge funds such that commerce and the motoring public needs are satisfied. A major shortcoming which states are experiencing is the NBIS data available is insufficient to perform certain functions required by new bridge management systems, such as modeling bridge deterioration and predicting costs. This paper will investigate how modal based nondestructive damage evaluation techniques can be integrated into bridge management using quality management principles. First, quality from the manufacturing perspective will be summarized. Next, the implementation of quality management in design and construction will be reinterpreted for bridge management. Based on this, a theory of approach will be formulated to improve the productivity of a highway transportation system.

  13. Building Better Bridges into STEM: A Synthesis of 25 Years of Literature on STEM Summer Bridge Programs

    PubMed Central

    Ashley, Michael; Cooper, Katelyn M.; Cala, Jacqueline M.; Brownell, Sara E.

    2017-01-01

    Summer bridge programs are designed to help transition students into the college learning environment. Increasingly, bridge programs are being developed in science, technology, engineering, and mathematics (STEM) disciplines because of the rigorous content and lower student persistence in college STEM compared with other disciplines. However, to our knowledge, a comprehensive review of STEM summer bridge programs does not exist. To provide a resource for bridge program developers, we conducted a systematic review of the literature on STEM summer bridge programs. We identified 46 published reports on 30 unique STEM bridge programs that have been published over the past 25 years. In this review, we report the goals of each bridge program and whether the program was successful in meeting these goals. We identify 14 distinct bridge program goals that can be organized into three categories: academic success goals, psychosocial goals, and department-level goals. Building on the findings of published bridge reports, we present a set of recommendations for STEM bridge programs in hopes of developing better bridges into college. PMID:29146667

  14. Arch-Axis Coefficient Optimization of Long-Span Deck-Type Concrete-Filled Steel Tubular Arch Bridge

    NASA Astrophysics Data System (ADS)

    Liu, Q. J.; Wan, S.; Liu, H. C.

    2017-11-01

    This paper is based on Nanpuxi super major bridge which is under construction and starts from Wencheng Zhejiang province to Taishun highway. A finite element model of the whole bridge is constructed using Midas Civil finite element software. The most adverse load combination in the specification is taken into consideration to determine the method of calculating the arch-axis coefficient of long-span deck-type concrete-filled steel tubular arch bridge. By doing this, this paper aims at providing references for similar engineering projects.

  15. Joint Knowledge Generation Between Climate Science and Infrastructure Engineering

    NASA Astrophysics Data System (ADS)

    Stoner, A. M. K.; Hayhoe, K.; Jacobs, J. M.

    2015-12-01

    Over the past decade the engineering community has become increasingly aware of the need to incorporate climate projections into the planning and design of sensitive infrastructure. However, this is a task that is easier said than done. This presentation will discuss some of the successes and hurdles experiences through the past year, from a climate scientist's perspective, working with engineers in infrastructure research and applied engineering through the Infrastructure & Climate Network (ICNet). Engineers rely on strict building codes and ordinances, and can be the subject of lawsuits if those codes are not followed. Matters are further complicated by the uncertainty inherent to climate projections, which include short-term natural variability, as well as the influence of scientific uncertainty and even human behavior on the rate and magnitude of change. Climate scientists typically address uncertainty by creating projections based on multiple models following different future scenarios. This uncertainty is difficult to incorporate into engineering projects, however, due to the fact that they cannot build two different bridges, one allowing for a lower amount of change, and another for a higher. More often than not there is a considerable difference between the costs of building two such bridges, which means that available funds often are the deciding factor. Discussions of climate science are often well received with engineers who work in the research area of infrastructure; going a step further, however, and implementing it in applied engineering projects can be challenging. This presentation will discuss some of the challenges and opportunities inherent to collaborations between climate scientists and transportation engineers, drawing from a range of studies including truck weight restrictions on roads during the spring thaw, and bridge deck performance due to environmental forcings.

  16. 68. Photocopy of drawing (from print, Burlington Northern Engineering Office) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    68. Photocopy of drawing (from print, Burlington Northern Engineering Office) STRESS DIAGRAM - Burlington Northern Railroad Bridge, Spanning Willamette River at River Mile 6.9, Portland, Multnomah County, OR

  17. Guidelines for determining the capacity of d-regions with premature concrete deterioration of ASR/DEF.

    DOT National Transportation Integrated Search

    2012-11-01

    When a bridge engineer encounters a design or analysis problem concerning a bridge substructure, that structure will commonly have a mixture of member types, some slender, and some squat. Slender members are generally governed by flexure, and normal ...

  18. Development of a TL-3 deep beam tubular backup bridge rail : executive summary report.

    DOT National Transportation Integrated Search

    2010-12-01

    Ohio Department of Transportation (ODOT)s Office of Structural Engineering has a need to evaluate and, if necessary, improve an existing bridge rail design with a simple retrofitting procedure to meet current or proposed crash testing standards. T...

  19. An expert system as applied to bridges : software development phase.

    DOT National Transportation Integrated Search

    1989-01-01

    This report describes the results of the third of a four-part study dealing with the use of a computerized expert system to assist bridge engineers in their structures management program. In this phase of the study, software (called DOBES) was writte...

  20. Effects of realistic heat straightening repair on the properties and serviceability of damaged steel beam bridges.

    DOT National Transportation Integrated Search

    2012-02-01

    The permanent deformations in steel beam bridges caused by collision with high profile vehicles can be repaired by heat straightening, : which is a structurally efficient and costeffective repair process developed by many engineers over the years....

  1. Guidelines for analyzing the capacity of d-regions with premature concrete deterioration of ASR/DEF.

    DOT National Transportation Integrated Search

    2015-03-01

    When a bridge engineer encounters a design or analysis problem concerning a bridge substructure, : that structure will commonly have a mixture of member types, some slender, and some squat. : Slender members are generally governed by flexure, and nor...

  2. Ultra-high resolution four dimensional geodetic imaging of engineered structures for stability assessment

    USGS Publications Warehouse

    Bawden, Gerald W.; Bond, Sandra; Podoski, J. H.; Kreylos, O.; Kellogg, L. H.

    2012-01-01

    We used ground-based Tripod LiDAR (T-LiDAR) to assess the stability of two engineered structures: a bridge spanning the San Andreas fault following the M6.0 Parkfield earthquake in Central California and a newly built coastal breakwater located at the Kaumālapa`u Harbor Lana'i, Hawaii. In the 10 weeks following the earthquake, we found that the surface under the bridge shifted 7.1 cm with an additional 2.6 cm of motion in the subsequent 13 weeks, which deflected the bridge's northern I-beam support 4.3 cm and 2.1 respectively; the bridge integrity remained intact. T-LiDAR imagery was collected after the completion of armored breakwater with 817 35-ton interlocking concrete armor units, Core-Locs®, in the summers of 2007, 2008 and 2010. We found a wide range of motion of individual Core-Locs, from a few centimeters to >110 cm along the ocean side of the breakwater, with lesser movement along the harbor side.

  3. Simulations of flow and prediction of sediment movement in Wymans Run, Cochranton Borough, Crawford County, Pennsylvania

    USGS Publications Warehouse

    Hittle, Elizabeth

    2011-01-01

    In small watersheds, runoff entering local waterways from large storms can cause rapid and profound changes in the streambed that can contribute to flooding. Wymans Run, a small stream in Cochranton Borough, Crawford County, experienced a large rain event in June 2008 that caused sediment to be deposited at a bridge. A hydrodynamic model, Flow and Sediment Transport and Morphological Evolution of Channels (FaSTMECH), which is incorporated into the U.S. Geological Survey Multi-Dimensional Surface-Water Modeling System (MD_SWMS) was constructed to predict boundary shear stress and velocity in Wymans Run using data from the June 2008 event. Shear stress and velocity values can be used to indicate areas of a stream where sediment, transported downstream, can be deposited on the streambed. Because of the short duration of the June 2008 rain event, streamflow was not directly measured but was estimated using U.S. Army Corps of Engineers one-dimensional Hydrologic Engineering Centers River Analysis System (HEC-RAS). Scenarios to examine possible engineering solutions to decrease the amount of sediment at the bridge, including bridge expansion, channel expansion, and dredging upstream from the bridge, were simulated using the FaSTMECH model. Each scenario was evaluated for potential effects on water-surface elevation, boundary shear stress, and velocity.

  4. 64. Photocopy of drawing (from print, Burlington Northern Engineering Office, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    64. Photocopy of drawing (from print, Burlington Northern Engineering Office, Seattle) STRESS SHEET - Burlington Northern Railroad Bridge, Spanning Willamette River at River Mile 6.9, Portland, Multnomah County, OR

  5. Applications of ground penetrating radar (GPR) in bridge deck monitoring and assessment

    NASA Astrophysics Data System (ADS)

    Alani, Amir M.; Aboutalebi, Morteza; Kilic, Gokhan

    2013-10-01

    This paper presents the essence of two case studies by the authors on two major bridges in the UK. The first case study reports on the applications of GPR and associated work carried out on the Forth Road Bridge near Edinburgh, Scotland, with the main objective of identifying possible structural defects including damaged rebar and moisture ingress at specific locations of the bridge deck. The second case study focuses on a full assessment of the Pentagon Road Bridge, in Chatham, Kent, England with particular emphasis on the identification of possible defects including structural cracks within the deck structure and establishing the layout of the upper and lower rebar positions throughout the bridge. These studies present interesting results in terms of locations of rebar and an accurate estimate of concrete cover condition as well as reporting on a remarkable similarity in the processed data concerning areas affected by ingress of moisture within the deck structures of the two bridges under investigation. It is believed that this paper will be of particular interest to bridge engineers and structural engineering practitioners with enthusiasm for adopting non-destructive testing methods such as GPR in the health monitoring and assessment of bridge structures. The observed similarities in the processed data between the two reported case studies present an interesting concept within the general context of the interpretation of GPR data, with the potential for use in many other forthcoming cases. The paper also reports on the adopted method for the GPR survey with emphasis on difficulties and challenges encountered during the actual survey. The presented results benefit from advanced processing and presentation techniques.

  6. Custodians of the Coast: History of the United States Army Engineers at Galveston

    DTIC Science & Technology

    1977-01-01

    along with western roads and other projects such as beacon lights, monuments, bridges , and aqueducts. Surveying for river and harbor improvements 11...involved in tunnel- ing, bridging , and spanning gullies. Lt. Amiel W. Whipple, exploring the thirty-fifth parallel, retraced the junior Abert’s route...preoccupation with transportation. In Texas, roads were poor; streams were not bridged and, in many cases, not navigable. Onerous freight expenses cut

  7. An Automatic Method for Geometric Segmentation of Masonry Arch Bridges for Structural Engineering Purposes

    NASA Astrophysics Data System (ADS)

    Riveiro, B.; DeJong, M.; Conde, B.

    2016-06-01

    Despite the tremendous advantages of the laser scanning technology for the geometric characterization of built constructions, there are important limitations preventing more widespread implementation in the structural engineering domain. Even though the technology provides extensive and accurate information to perform structural assessment and health monitoring, many people are resistant to the technology due to the processing times involved. Thus, new methods that can automatically process LiDAR data and subsequently provide an automatic and organized interpretation are required. This paper presents a new method for fully automated point cloud segmentation of masonry arch bridges. The method efficiently creates segmented, spatially related and organized point clouds, which each contain the relevant geometric data for a particular component (pier, arch, spandrel wall, etc.) of the structure. The segmentation procedure comprises a heuristic approach for the separation of different vertical walls, and later image processing tools adapted to voxel structures allows the efficient segmentation of the main structural elements of the bridge. The proposed methodology provides the essential processed data required for structural assessment of masonry arch bridges based on geometric anomalies. The method is validated using a representative sample of masonry arch bridges in Spain.

  8. 37. Photographic copy of the original construction drawing, 1934, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photographic copy of the original construction drawing, 1934, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department. Stress sheet, continuous span - Mark Twain Memorial Bridge, Spanning Mississippi River at US Route 36, Hannibal, Marion County, MO

  9. Guidelines for replacement of deficient bridges with low-water stream crossings in the rural Midwest.

    DOT National Transportation Integrated Search

    2017-02-01

    This report provides guidance to public officials and engineers considering the replacement of a deficient or obsolete bridge with a low-water stream crossing (LWSC). An LWSC is a structure that is occasionally overtopped by floodwaters and is likely...

  10. Assessing the damage potential in pretensioned bridges caused by increased truck loads due to freight movements (phase II).

    DOT National Transportation Integrated Search

    2011-08-01

    With aging and deterioration of bridges, evaluation of existing conditions of their structural elements becomes vital to : engineers and public officials when deciding how to repair or replace the structures. The ability to obtain necessary : informa...

  11. Pilot project - demonstration of capabilities and benefits of bridge load rating through physical testing : tech transfer summary.

    DOT National Transportation Integrated Search

    2013-08-01

    This project demonstrated the capabilities for load testing bridges in Iowa, developed and presented a webinar to local and state engineers, and produced a spreadsheet and benefit evaluation matrix that others can use to preliminarily assess where br...

  12. Pier scour equations used in the People's Republic of China : review and summary

    DOT National Transportation Integrated Search

    1993-09-01

    Equations for estimating scour depth at bridge structures was developed from model and field data presented at the Symposium on Scour at Bridges in China, 1964. These equations have been used in highway and railway engineering in China for more than ...

  13. Engaging Faculty for Innovative STEM Bridge Programs

    ERIC Educational Resources Information Center

    Goldfien, Andrea C.; Badway, Norena Norton

    2014-01-01

    Bridge programs, in which underprepared students gain the academic and technical skills necessary for college level courses and entry-level employment, are a promising initiative for expanding access to, and success in, community college education. For career pathways related to science, technology, engineering, or mathematics (STEM), bridge…

  14. 1. Photocopied December, 1977, from loose original engineering drawing, Jervis ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photocopied December, 1977, from loose original engineering drawing, Jervis Library. SECTIONS OF INDIAN BROOK CLUVERT - Old Croton Aqueduct, Indian Creek Culvert, Reservoir & Quaker Bridge Roads, Crotonville, Ossining, Westchester County, NY

  15. 4. Photocopied December 1977, from loose original engineering drawing, Jervis ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Photocopied December 1977, from loose original engineering drawing, Jervis Library. CENTERING FOR 88-FOOT ARCH. - Old Croton Aqueduct, Sing Sing Kill Bridge, Spanning Aqueduct Street & Broadway, Ossining, Westchester County, NY

  16. 14. June 1974. VIEW OF THE ENGINE ROOM, LOOKING NORTH, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. June 1974. VIEW OF THE ENGINE ROOM, LOOKING NORTH, SHOWING THE OTTO GASOLINE ENGINE, THE DRIVE PULLEY IS BARELY VISIBLE TO THE LEFT OF THE FLYWHEEL. - Gruber Wagon Works, Pennsylvania Route 183 & State Hill Road at Red Bridge Park, Bernville, Berks County, PA

  17. Learning from the Parallel Pathways of Makers to Broaden Pathways to Engineering

    ERIC Educational Resources Information Center

    Foster, Christina; Wigner, Aubrey; Lande, Micah; Jordan, Shawn S.

    2018-01-01

    Background: Makers are a growing community of STEM-minded people who bridge technical and non-technical backgrounds to imagine, build and fabricate engineering systems. Some have engineering training, some do not. This paper presents a study to explore the educational pathways of adult Makers and how they intersect with engineering. This research…

  18. Institute-Industry Interoperation Model: An Industry-Oriented Engineering Education Strategy in China

    ERIC Educational Resources Information Center

    Wang, Yanqing; Qi, Zhongying; Li, Ziru; Zhang, Lijie

    2011-01-01

    Engineering education has been well implemented in the majority of developed countries such as the USA, Germany, and the United Kingdom so that the gap between engineering science and engineering practice is greatly bridged. However, in China, the gap still exists, and some attempts by Chinese government, even though having made obvious progress,…

  19. The Status and Prospect of Research into Protective Structures of Bridge Piers against Rockfall Impact

    NASA Astrophysics Data System (ADS)

    Gao, Liang; Zhang, Shan; Zhang, Junfa; Wu, Xiangnan

    2017-06-01

    Rockfall impact on bridge piers threats severely the mountain bridge structures of lifeline engineering. Intended for mountain bridge pier protection against rockfall impact, the paper conducted comprehensive reviews on the research status of impact effects, anti-collision structure, impact response to rockfall, and protective design at home and abroad, and proposed a new-type protective structure against rockfall impact. In addition, the paper carried out deep studies on such key scientific issues as impact effect calculation, protective materials against rockfall impact, damage mechanism of protective units, and parameter optimization on the system of protective structures against rockfall impact as well, aiming to strength disaster prevention of mountain bridge structures.

  20. Guidelines for replacement of deficient bridges with low-water stream crossings in the rural Midwest : technical summary.

    DOT National Transportation Integrated Search

    2017-02-01

    This report provides guidance to public officials and engineers considering the replacement of a deficient or obsolete bridge with a low-water stream crossing (LWSC). An LWSC is a structure that is occasionally overtopped by floodwaters and is likely...

  1. View forward from secondary bridge; note stack for venting after ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View forward from secondary bridge; note stack for venting after boilers, ventilators, davits, searchlights on port and starboard stanchions and ship's pulling boats; skylight at lower center provides light to engine room. (p30) - USS Olympia, Penn's Landing, 211 South Columbus Boulevard, Philadelphia, Philadelphia County, PA

  2. PBF (PER620) south facade. Camera facing north. Note pedestrian bridge ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF (PER-620) south facade. Camera facing north. Note pedestrian bridge crossing over conduit. Central high bay contains reactor room and canal. Date: March 2004. INEEL negative no. HD-41-2-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  3. 59. Photographic copy of the original construction drawing, 1934, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    59. Photographic copy of the original construction drawing, 1934, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department. Construction changes in pier 7 - Mark Twain Memorial Bridge, Spanning Mississippi River at US Route 36, Hannibal, Marion County, MO

  4. 41. Photographic copy of the original construction drawing, 192627, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. Photographic copy of the original construction drawing, 1926-27, by Harrington, Howard, and Ash, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department, Jefferson City, Missouri. STRESS SHEET - Cape Girardeau Bridge, Spanning Mississippi River at State Highway 146, Cape Girardeau, Cape Girardeau County, MO

  5. 45. Photographic copy of the original construction drawing, 1934, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. Photographic copy of the original construction drawing, 1934, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department. Cross section--300-ft. span - Mark Twain Memorial Bridge, Spanning Mississippi River at US Route 36, Hannibal, Marion County, MO

  6. 44. Photographic copy of the original construction drawing, 1934, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photographic copy of the original construction drawing, 1934, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department. Details of 300-ft. span - Mark Twain Memorial Bridge, Spanning Mississippi River at US Route 36, Hannibal, Marion County, MO

  7. Evaluation of design methods to determine scour depths for bridge structures : LTRC research project capsule 08-3ST.

    DOT National Transportation Integrated Search

    2009-04-01

    Scour, an engineering term for erosion, is : the result of the erosive action of flowing : water excavating and carrying away : material from the bed and banks of : streams and from around the piers and : abutments of bridges. For analysis : purposes...

  8. The Efficacy of Surface Haptics and Force Feedback in Education

    ERIC Educational Resources Information Center

    Gorlewicz, Jenna Lynn

    2013-01-01

    This dissertation bridges the fields of haptics, engineering, and education to realize some of the potential benefits haptic devices may have in Science, Technology, Engineering, and Math (STEM) education. Specifically, this dissertation demonstrates the development, implementation, and assessment of two haptic devices in engineering and math…

  9. Trial guidelines for the conservation of Virginia's historic bridges.

    DOT National Transportation Integrated Search

    1986-01-01

    Interest in the preservation of historic engineering structures has increased dramatically over the past decade. Because civil engineering structures primarily serve functions in the public domain, their preservation focuses attention on what appear ...

  10. 9. Photocopy of photograph original print located in collection of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photocopy of photograph original print located in collection of William H. Caruthers, Jr., Richmond, Virginia, and loaned by Susan A. Harter, Tempe, Arizona. Photographer assumed to be William H. Caruthers, Sr., assistant (construction) engineer for the Ash Avenue Bridge, 1912 VIEW OF ASH AVENUE BRIDGE UNDER CONSTRUCTION, LOOKING NORTH, SHOWING STEEL REINFORCEMENT IN DECK BEFORE PLACEMENT OF CONCRETE - Ash Avenue Bridge, Spanning Salt River at Foot of Ash Avenue, Tempe, Maricopa County, AZ

  11. Plans for Improvement of Navigation Conditions at Greenville Bridge, Mississippi River: Model Investigation

    DTIC Science & Technology

    1953-06-01

    TA7 ,vJ31 (\\0’ 2..- .:;~b £c CORPS OF ENGINEERS, U. S. ARMY PLANS FOR IMPROVEMENT OF NAVIGATION CONDITIONS AT GREENVILLE BRIDGE, MISSISSIPPI...REPORT TYPE 3. DATES COVERED 00-00-1953 to 00-00-1953 4. TITLE AND SUBTITLE Plans for Improvement of Navigation Conditions at Greenville...of plans to improve navigation conditions on the Mississippi River in the vicinity of the Greenville Bridge at Greenville, Mississ:l.ppi, was

  12. White House Science Fair

    NASA Image and Video Library

    2014-05-27

    Girl Scout troop 2612 members from Tulsa, OK take photos of one another with Google Glass at the White House Science Fair Tuesday, May 27, 2014. Avery Dodson, 6; Natalie Hurley, 8; Miriam Schaffer, 8; Claire Winton, 8; and Lucy Claire Sharp, 8 participated in the Junior FIRST Lego League's Disaster Blaster Challenge, which invites elementary-school-aged students from across the country to explore how simple machines, engineering, and math can help solve problems posed by natural disasters. The girls invented the "Flood Proof Bridge" and built a model mechanizing the bridge using motors and developing a computer program to automatically retract the bridge when flood conditions are detected. The fourth White House Science Fair was held at the White House and included 100 students from more than 30 different states who competed in science, technology, engineering, and math (STEM) competitions. (Photo Credit: NASA/Aubrey Gemignani)

  13. Implementation of civionics in a second generation steel-free bridge deck

    NASA Astrophysics Data System (ADS)

    Klowak, Chad; Rivera, Evangeline; Mufti, Aftab

    2005-05-01

    As the design and construction of civil structures continue to evolve, it is becoming imperative that these structures be monitored for their health. In order to meet this need, the discipline of Civionics has emerged. Civionics is a new term coined from Civil-Electronics, which is derived from the application of electronics to civil structures. It is similar to the term Avionics, which is used in the aerospace industry. If structural health monitoring is to become part of civil structural engineering, it should include Civionics. It involves the application of electronics to civil structures and aims to assist engineers in realizing the full benefits of structural health monitoring (SHM). In past SHM field applications, the main reason for the failure of a sensor was not the installation of the sensor itself but the egress of the sensor cables. Often, the cables were not handled and protected correctly. For SHM to be successful, specifications must be written on the entire process, beginning with system design and concluding with data collection, interpretation, and management. Civionics specifications include the technical requirements for a SHM system which encompasses fibre optic sensors, cables, conduits, junction boxes and the control room. A specification for data collection and storage is currently being developed as well. In the spring of 2004 research engineers at the University of Manitoba constructed a full-scale second generation steel free bridge deck. The bridge deck is the first of its kind to fully incorporate a complete civionics structural health monitoring system to monitor the deck's behaviour during destructive testing. Throughout the construction of the bridge deck, the entire installation of the civionics system was carried out by research engineers simulating an actual implementation of such a system in a large scale construction environment. One major concern that consulting engineers have raised is the impact that a civionics system that uses conduit, junction boxes, and other electrical ancillary protection, will have when embedded and installed externally on full-scale infrastructure. The full-scale destructive testing of a second generation steel-free bridge deck using a civionics system designed and implemented following guidelines in a civioncs specification manual at the University of Manitoba will provide engineers with the information necessary to address the constructability and structural integrity issues. Civioncs combined with structural health monitoring will provide engineers with feedback necessary to aid in optimizing design techniques and understanding our infrastructures performance, behaviour and state of condition.

  14. Superhydrophobic engineered cementitious composites for highway applications : phase I.

    DOT National Transportation Integrated Search

    2013-05-01

    The strength and durability of highway bridges are two of the key components in maintaining a high level of freight transportation capacity on the nations highways. This research focused on developing new hybrid superhydrophobic engineered cementi...

  15. 15. View looking N at foundation ruins of steam engine ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. View looking N at foundation ruins of steam engine and cane mill. - Hacienda Azucarera La Esperanza, Mill (Ruins), 2.65 miles North of PR Route 2 Bridge Over Manati River, Manati, Manati Municipio, PR

  16. 16. View looking E at foundation ruins of steam engine ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. View looking E at foundation ruins of steam engine and cane mill. - Hacienda Azucarera La Esperanza, Mill (Ruins), 2.65 miles North of PR Route 2 Bridge Over Manati River, Manati, Manati Municipio, PR

  17. Criteria for preservation and adaptive use of historic highway structures.

    DOT National Transportation Integrated Search

    1978-01-01

    Metal truss bridges are uniquely indigenous products of American engineering and construction technology, and in recent years their historic significance has been increasingly recognized along with that of other early engineering structures. Some tru...

  18. 18. Photocopy of an engineering drawing (original in the Collection ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photocopy of an engineering drawing (original in the Collection of the Washington State Department of Public Works)--August 1921--LOCATION-TOPOGRAPHY AND GENERAL ELEVATION - Pasco-Kennewick Bridge, Spanning Columbia River, Pasco, Franklin County, WA

  19. Helping System Engineers Bridge the Peaks

    NASA Technical Reports Server (NTRS)

    Rungta, Neha; Tkachuk, Oksana; Person, Suzette; Biatek, Jason; Whalen, Michael W.; Castle, Joseph; Castle, JosephGundy-Burlet, Karen

    2014-01-01

    In our experience at NASA, system engineers generally follow the Twin Peaks approach when developing safety-critical systems. However, iterations between the peaks require considerable manual, and in some cases duplicate, effort. A significant part of the manual effort stems from the fact that requirements are written in English natural language rather than a formal notation. In this work, we propose an approach that enables system engineers to leverage formal requirements and automated test generation to streamline iterations, effectively "bridging the peaks". The key to the approach is a formal language notation that a) system engineers are comfortable with, b) is supported by a family of automated V&V tools, and c) is semantically rich enough to describe the requirements of interest. We believe the combination of formalizing requirements and providing tool support to automate the iterations will lead to a more efficient Twin Peaks implementation at NASA.

  20. Recent research and applications of numerical simulation for dynamic response of long-span bridges subjected to multiple loads.

    PubMed

    Chen, Zhiwei; Chen, Bo

    2014-01-01

    Many long-span bridges have been built throughout the world in recent years but they are often subject to multiple types of dynamic loads, especially those located in wind-prone regions and carrying both trains and road vehicles. To ensure the safety and functionality of these bridges, dynamic responses of long-span bridges are often required for bridge assessment. Given that there are several limitations for the assessment based on field measurement of dynamic responses, a promising approach is based on numerical simulation technologies. This paper provides a detailed review of key issues involved in dynamic response analysis of long-span multiload bridges based on numerical simulation technologies, including dynamic interactions between running trains and bridge, between running road vehicles and bridge, and between wind and bridge, and in the wind-vehicle-bridge coupled system. Then a comprehensive review is conducted for engineering applications of newly developed numerical simulation technologies to safety assessment of long-span bridges, such as assessment of fatigue damage and assessment under extreme events. Finally, the existing problems and promising research efforts for the numerical simulation technologies and their applications to assessment of long-span multiload bridges are explored.

  1. Recent Research and Applications of Numerical Simulation for Dynamic Response of Long-Span Bridges Subjected to Multiple Loads

    PubMed Central

    Chen, Zhiwei; Chen, Bo

    2014-01-01

    Many long-span bridges have been built throughout the world in recent years but they are often subject to multiple types of dynamic loads, especially those located in wind-prone regions and carrying both trains and road vehicles. To ensure the safety and functionality of these bridges, dynamic responses of long-span bridges are often required for bridge assessment. Given that there are several limitations for the assessment based on field measurement of dynamic responses, a promising approach is based on numerical simulation technologies. This paper provides a detailed review of key issues involved in dynamic response analysis of long-span multiload bridges based on numerical simulation technologies, including dynamic interactions between running trains and bridge, between running road vehicles and bridge, and between wind and bridge, and in the wind-vehicle-bridge coupled system. Then a comprehensive review is conducted for engineering applications of newly developed numerical simulation technologies to safety assessment of long-span bridges, such as assessment of fatigue damage and assessment under extreme events. Finally, the existing problems and promising research efforts for the numerical simulation technologies and their applications to assessment of long-span multiload bridges are explored. PMID:25006597

  2. Assessment of modal-pushover-based scaling procedure for nonlinear response history analysis of ordinary standard bridges

    USGS Publications Warehouse

    Kalkan, E.; Kwong, N.

    2012-01-01

    The earthquake engineering profession is increasingly utilizing nonlinear response history analyses (RHA) to evaluate seismic performance of existing structures and proposed designs of new structures. One of the main ingredients of nonlinear RHA is a set of ground motion records representing the expected hazard environment for the structure. When recorded motions do not exist (as is the case in the central United States) or when high-intensity records are needed (as is the case in San Francisco and Los Angeles), ground motions from other tectonically similar regions need to be selected and scaled. The modal-pushover-based scaling (MPS) procedure was recently developed to determine scale factors for a small number of records such that the scaled records provide accurate and efficient estimates of “true” median structural responses. The adjective “accurate” refers to the discrepancy between the benchmark responses and those computed from the MPS procedure. The adjective “efficient” refers to the record-to-record variability of responses. In this paper, the accuracy and efficiency of the MPS procedure are evaluated by applying it to four types of existing Ordinary Standard bridges typical of reinforced concrete bridge construction in California. These bridges are the single-bent overpass, multi-span bridge, curved bridge, and skew bridge. As compared with benchmark analyses of unscaled records using a larger catalog of ground motions, it is demonstrated that the MPS procedure provided an accurate estimate of the engineering demand parameters (EDPs) accompanied by significantly reduced record-to-record variability of the EDPs. Thus, it is a useful tool for scaling ground motions as input to nonlinear RHAs of Ordinary Standard bridges.

  3. Documentation for assessment of modal pushover-based scaling procedure for nonlinear response history analysis of "ordinary standard" bridges

    USGS Publications Warehouse

    Kalkan, Erol; Kwong, Neal S.

    2010-01-01

    The earthquake engineering profession is increasingly utilizing nonlinear response history analyses (RHA) to evaluate seismic performance of existing structures and proposed designs of new structures. One of the main ingredients of nonlinear RHA is a set of ground-motion records representing the expected hazard environment for the structure. When recorded motions do not exist (as is the case for the central United States), or when high-intensity records are needed (as is the case for San Francisco and Los Angeles), ground motions from other tectonically similar regions need to be selected and scaled. The modal-pushover-based scaling (MPS) procedure recently was developed to determine scale factors for a small number of records, such that the scaled records provide accurate and efficient estimates of 'true' median structural responses. The adjective 'accurate' refers to the discrepancy between the benchmark responses and those computed from the MPS procedure. The adjective 'efficient' refers to the record-to-record variability of responses. Herein, the accuracy and efficiency of the MPS procedure are evaluated by applying it to four types of existing 'ordinary standard' bridges typical of reinforced-concrete bridge construction in California. These bridges are the single-bent overpass, multi span bridge, curved-bridge, and skew-bridge. As compared to benchmark analyses of unscaled records using a larger catalog of ground motions, it is demonstrated that the MPS procedure provided an accurate estimate of the engineering demand parameters (EDPs) accompanied by significantly reduced record-to-record variability of the responses. Thus, the MPS procedure is a useful tool for scaling ground motions as input to nonlinear RHAs of 'ordinary standard' bridges.

  4. 20. Photographic copy of the original construction drawing, 193031, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photographic copy of the original construction drawing, 1930-31, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department, Jefferson City, Missouri. Truss stress diagram, and plans of laterals and sway braces - Gasconade Bridge, Spanning Gasconade River at State Route 100, Gasconade, Gasconade County, MO

  5. 9. DETAIL VIEW OF BRIDGE CRANE ON WEST SIDE OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. DETAIL VIEW OF BRIDGE CRANE ON WEST SIDE OF BUILDING. CAMERA FACING NORTHEAST. CONTAMINATED AIR FILTERS LOADED IN TRANSPORT CASKS WERE TRANSFERRED TO VEHICLES AND SENT TO RADIOACTIVE WASTE MANAGEMENT COMPLEX FOR STORAGE. INEEL PROOF NUMBER HD-17-1. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  6. 15. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox copy of original plans, dated 1932, by Wisconsin Highway Commission. Xerox copy in possession of Westbrook Associated Engineers, Spring Green, Wisconsin. GENERAL PLAN AND ELEVATION OF BRIDGE. - Chippewa River Bridge, Spanning Chippewa River at State Highway 35, Nelson, Buffalo County, WI

  7. 11. Photographic copy of lines drawing of original construction (24 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photographic copy of lines drawing of original construction (24 January 1911, in possession of St. Louis County Bridge Engineer, Virginia, Minnesota). Profile of main and approach spans; plan and sectional view of concrete river pier - Brosseau Road Bridge, County Road 694 spanning Cloquet at River, Burnett, St. Louis County, MN

  8. 75 FR 4612 - Agency Information Collection Activities: Notice of Request for Extension of Currently Approved...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... construction time and traffic congestion; C. The development of engineering design criteria for innovative products, materials, and structural systems for use in highway bridges and structures; D. The reduction of... construction, repair, and rehabilitation of bridges and other highway structures. This program was funded by...

  9. NREL Bridges Fuels and Engines R&D to Maximize Vehicle Efficiency and

    Science.gov Websites

    innovation-from fuel chemistry, conversion, and combustion to the evaluation of advanced fuels in actual -cylinder engine for advanced compression ignition fuels research will be installed and commissioned in the vehicle performance and emissions research, two engine dynamometer test cells for advanced fuels research

  10. Engineer: The Professional Bulletin of Army Engineers. Volume 41, May-August 2011

    DTIC Science & Technology

    2011-08-01

    agement Authority ( NDMA ), more than 20 million Paki- stanis have been affected by this catastrophic event—the country’s worst monsoon season in 80 years... NDMA for the Pakistan mil- itary engineers to install, and an official bridge turnover ceremony was held at the U.S. embassy in Islamabad on 1

  11. 10. Photocopy of photograph original print located in collection of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photocopy of photograph original print located in collection of William H. Caruthers, Jr., Richmond, Virginia, and loaned by Susan A. Hatter, Tempe, Arizona. Photographer assumed to be William H. Caruthers, Sr., assistant (construction) engineer for the Ash Avenue Bridge, 1912 VIEW, LOOKING NORTH, SHOWING ASH AVENUE BRIDGE UNDER CONSTRUCTION. WORK IS PROGRESSING FROM THE SOUTH BANK TO THE NORTH BANK OF THE SALT RIVER - Ash Avenue Bridge, Spanning Salt River at Foot of Ash Avenue, Tempe, Maricopa County, AZ

  12. Bridging the Engineering and Medicine Gap

    NASA Technical Reports Server (NTRS)

    Walton, M.; Antonsen, E.

    2018-01-01

    A primary challenge NASA faces is communication between the disparate entities of engineers and human system experts in life sciences. Clear communication is critical for exploration mission success from the perspective of both risk analysis and data handling. The engineering community uses probabilistic risk assessment (PRA) models to inform their own risk analysis and has extensive experience managing mission data, but does not always fully consider human systems integration (HSI). The medical community, as a part of HSI, has been working 1) to develop a suite of tools to express medical risk in quantitative terms that are relatable to the engineering approaches commonly in use, and 2) to manage and integrate HSI data with engineering data. This talk will review the development of the Integrated Medical Model as an early attempt to bridge the communication gap between the medical and engineering communities in the language of PRA. This will also address data communication between the two entities in the context of data management considerations of the Medical Data Architecture. Lessons learned from these processes will help identify important elements to consider in future communication and integration of these two groups.

  13. A model study of bridge hydraulics : technical summary.

    DOT National Transportation Integrated Search

    2010-08-01

    Most flood studies in the United States use the Army Corps of Engineers Hydrologic Engineering Centers River Analysis System (HEC-RAS) computer program. This report is the second edition. The first edition of the report considered the laboratory m...

  14. Best Manufacturing Practices Survey Conducted at Litton Data Systems Division, Van Nuys, California

    DTIC Science & Technology

    1988-10-01

    Hardware and Software ................................ 10 DESIGN RELEASE Engineering Change Order Processing and Analysis...structured using bridges to isolate local traffic. Long term plans call for a wide-band network. ENGINEERING CHANGE ORDER PROCESSING AND ANALYSIS

  15. Fuzzy Based Decision Support System for Condition Assessment and Rating of Bridges

    NASA Astrophysics Data System (ADS)

    Srinivas, Voggu; Sasmal, Saptarshi; Karusala, Ramanjaneyulu

    2016-09-01

    In this work, a knowledge based decision support system has been developed to efficiently handle the issues such as distress diagnosis, assessment of damages and condition rating of existing bridges towards developing an exclusive and robust Bridge Management System (BMS) for sustainable bridges. The Knowledge Based Expert System (KBES) diagnoses the distresses and finds the cause of distress in the bridge by processing the data which are heuristic and combined with site inspection results, laboratory test results etc. The coupling of symbolic and numeric type of data has been successfully implemented in the expert system to strengthen its decision making process. Finally, the condition rating of the bridge is carried out using the assessment results obtained from the KBES and the information received from the bridge inspector. A systematic procedure has been developed using fuzzy mathematics for condition rating of bridges by combining the fuzzy weighted average and resolution identity technique. The proposed methodologies and the decision support system will facilitate in developing a robust and exclusive BMS for a network of bridges across the country and allow the bridge engineers and decision makers to carry out maintenance of bridges in a rational and systematic way.

  16. NREL Fuels and Engines R&D Revs Up Vehicle Efficiency, Performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    NREL bridges fuels and engines R&D to maximize vehicle efficiency and performance. The lab’s fuels and engines research covers the full spectrum of innovation—from fuel chemistry, conversion, and combustion to the evaluation of how fuels interact with engine and vehicle design. This innovative approach has the potential to positively impact our economy, national energy security, and air quality.

  17. Superhydrophobic engineered cementitious composites for highway applications : phase II.

    DOT National Transportation Integrated Search

    2013-06-01

    The strength and durability of highway bridges are two of the key components in maintaining a : high level of freight transportation capacity on the nations highways. : The CFIRE project 04-09 demonstrated the feasibility of a new hybrid engineered...

  18. Development of Specifications for Engineered Cementitious Composites for Use in Bridge Deck Overlays

    DOT National Transportation Integrated Search

    2016-02-01

    Engineered cementitious composite (ECC) material is a high strength, fiber-reinforced, ductile mortar mixture that can exhibit tensile strains of up to 5%. ECC has a dense matrix, giving the material exceptional durability characteristics. The durabi...

  19. Design procedures for heat-straightening repair : an engineering guide.

    DOT National Transportation Integrated Search

    1992-12-01

    This report summarizes over four years of research on heat-straightening repairs and provides a prototype engineering guide for the application of heat-straightening to bridge structures. It is based on the research results detailed in a companion re...

  20. Engineer: The Professional Bulletin of Army Engineers. Volume 38, PB 5-08-3/4, July-December 2008

    DTIC Science & Technology

    2008-12-01

    50 The Battle of Shiloh By Captain John T. Shelton 54 Pioneering Nondoctrinal Bridging Operations: The “Roller Skate ” Repair By First...for Army Lessons Learned (CALL) to conduct an Engineer and Base Camp Collection and Analysis Team (CAAT). As a result of this trip, we collected a...provided an outbrief at the 20th Engineer Brigade Lessons Learned Conference in December. Many thanks to the 20th Engineer Brigade, 926th Engineer

  1. Concept Development Modular Hybrid Pier (MHP)

    DTIC Science & Technology

    2000-02-01

    rated FRP composite bridge or bridge deck is commercially available from Creative Pultrusions, Kansas Structural Systems, Martin - Marietta , Hardcore...NAVAL FACILITIES ENGINEERING SERVICE CENTER Port Hueneme, California 93043-4370 Contract Report CR 00-001-SHR FINAL REPORT PHASE 1 - CONCEPT...20000301 043 Approved for public release; distribution is unlimited. DTIC QUALITY IMWSOfBD 4 ^^ Printed on recycled paper REPORT DOCUMENTATION PAGE

  2. Plans for crash-tested bridge railings for longitudinal wood decks on low-volume roads

    Treesearch

    Michael A. Ritter; Ronald K. Faller; Steve Bunnell; Paula D. Hilbrich Lee; Barry T. Rosson

    1998-01-01

    The plans for crashworthy bridge railings for low-volume roads were developed through a cooperative research program involving the USDA Forest Service, Forest Products Laboratory (FPL); the Midwest Roadside Safety Facility, University of Nebraska-Lincoln (MwRSF); and the Forest Service, National Forest System, Engineering. Three railings were developed and successfully...

  3. 32. VERTICAL OSCILLATIONS, 3/4 VIEW, 7 NOVEMBER 1940, FROM 16MM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. VERTICAL OSCILLATIONS, 3/4 VIEW, 7 NOVEMBER 1940, FROM 16MM FILM SHOT PROFESSOR F.B. FARQUHARSON, UNIVERSITY OF WASHINGTON. (LABORATORY STUDIES ON THE TACOMA NARROWS BRIDGE, AT UNIVERSITY OF WASHINGTON (SEATTLE: UNIVERSITY OF WASHINGTON, DEPARTMENT OF CIVIL ENGINEERING, 1941) - Tacoma Narrows Bridge, Spanning Narrows at State Route 16, Tacoma, Pierce County, WA

  4. Building Bridges, Robots, and High Expectations

    ERIC Educational Resources Information Center

    Bennie, Fiona; Corbett, Charlotte; Palo, Angela

    2015-01-01

    This article describes an after-school program at the Horace Mann School for the Deaf (HMS), the oldest public day school for deaf students in the United States, where almost half of the student body imagined and created bridge and robotic machines. The Deaf Robotics Engineering and Math Team, or the DREAM Team club, included HMS students in…

  5. Smart timber bridge on geosynthetic reinforced soil (GRS) abutments

    Treesearch

    Adam Senalik; James P. Wacker; Travis K. Hosteng; John Hermanson

    2017-01-01

    Recently, Buchanan County, Iowa, has cooperated with the U.S. Federal Highway Administration (FHWA), USDA Forest Service, Forest Products Laboratory (FPL), and Iowa State University’s Bridge Engineering Center (ISU–BEC) to initiate a project involving the construction and monitoring of a glued-laminated (glulam) timber superstructure on geosynthetic reinforced soil (...

  6. Research and Teaching: Association of Summer Bridge Program Outcomes with STEM Retention of Targeted Demographic Groups

    ERIC Educational Resources Information Center

    Tomasko, David L.; Ridgway, Judith S.; Waller, Rocquel J.; Olesik, Susan V.

    2016-01-01

    Retention of students to science, technology, engineering, and mathematics (STEM) major has been studied for four cohorts participating in a summer bridge program supported by the National Science Foundation. Students participated in a 6-week program prior to their first term of enrollment at a research-intensive land grant university. Comparisons…

  7. Learning Based on the Project Entitled "Design and Construction of a Wooden Bridge"

    ERIC Educational Resources Information Center

    Barris, Cristina; Torres, Lluís; Simon, Enric

    2016-01-01

    This article presents the results of a case involving the application of project-based learning carried out with students in the Mechanical Engineering degree program at the University of Girona. The project, entitled "Design and construction of a wooden bridge", was conducted at the Polytechnic School in the third-year Structures…

  8. "Bridging" Engineering & Art: An Outreach Approach for Middle and High School Students

    ERIC Educational Resources Information Center

    Asiabanpour, Bahram; DesChamps-Benke, Nicole; Wilson, Thomas; Loerwald, Matthew; Gourgey, Hannah

    2010-01-01

    This paper describes a novel outreach approach to high school and middle school students to familiarize them with engineering functions and methods. In this approach students participated in a seven-day summer research camp and learned many engineering skills and tools such as CAD solid modeling, finite element analysis, rapid prototyping,…

  9. Information-theoretical noninvasive damage detection in bridge structures

    NASA Astrophysics Data System (ADS)

    Sudu Ambegedara, Amila; Sun, Jie; Janoyan, Kerop; Bollt, Erik

    2016-11-01

    Damage detection of mechanical structures such as bridges is an important research problem in civil engineering. Using spatially distributed sensor time series data collected from a recent experiment on a local bridge in Upper State New York, we study noninvasive damage detection using information-theoretical methods. Several findings are in order. First, the time series data, which represent accelerations measured at the sensors, more closely follow Laplace distribution than normal distribution, allowing us to develop parameter estimators for various information-theoretic measures such as entropy and mutual information. Second, as damage is introduced by the removal of bolts of the first diaphragm connection, the interaction between spatially nearby sensors as measured by mutual information becomes weaker, suggesting that the bridge is "loosened." Finally, using a proposed optimal mutual information interaction procedure to prune away indirect interactions, we found that the primary direction of interaction or influence aligns with the traffic direction on the bridge even after damaging the bridge.

  10. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 28, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, general view upstream from Franklin Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  11. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 8, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream at Stone Arch Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  12. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, March 27, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, view of stadium upstream from point bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  13. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 28, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, general view downstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  14. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 10, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view of construction downstream at First Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  15. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 19, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, general view upstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  16. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, December 4, 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream from Fourth Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  17. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 3, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream at Fourth Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  18. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 21, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view downstream from Walnut Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  19. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 28, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, view upstream from Franklin Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  20. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 27, 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 2, general view downstream from Coopersdale Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  1. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 28, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, view downstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  2. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, March 27, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, general view upstream from Johns Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  3. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 3, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view upstream at Fourth Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  4. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 27, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream from Point Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  5. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 18, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 2, general view from Coopersdale Bridge ramp - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  6. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, September 27, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream toward ten acre railroad bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  7. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 19, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, general view downstream from Horner Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  8. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 28, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, view upstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  9. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, July, 11, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, general view upstream from incline bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  10. Value engineering and cost effectiveness of various fiber reinforced polymer (FRP) repair systems.

    DOT National Transportation Integrated Search

    2006-06-01

    Seventeen 40 year old C-Channel type prestressed concrete bridge girders and one impact damaged AASHTO : Type II prestressed concrete girder were tested under static and fatigue loading to determine the cost-effectiveness : and value engineering aspe...

  11. Enhanced Learning from an Industry-University Partnership. Aluminum Engineering Course Design and Development.

    ERIC Educational Resources Information Center

    Pai, Devdas M.; DeBlasio, Richard A.

    1997-01-01

    The example of Alcoa and North Carolina State University shows that partnerships in course design, development, and delivery can result in an engineering curriculum that bridges theory and practice and makes students aware of industry expectations. (SK)

  12. 11. Photocopy of an elevation drawing (dated January 1924, B.J. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photocopy of an elevation drawing (dated January 1924, B.J. Garnett, Designing Engineer, H.S. Baker, County Engineer), housed at the Spokane County Public Works Department, Spokane - Latah Creek Bridge No. 4102, Prairie View Road, Waverly, Spokane County, WA

  13. Dynamic and Fatigue Analysis of an 18th Century Steel Arch Bridge

    NASA Astrophysics Data System (ADS)

    Boumechra, Nadir; Hamdaoui, Karim

    2008-07-01

    Within the "Oran-Tlemcen" railway line realization project (159 km), several bridges were built by the Railroads Algerian West Company. 7 km from the east of Tlemcen city, this railway line must cross a very broken mountainous collar, that's why the French engineer "Gustave Eiffel" was solicited to construct a 68 m length bridge. In 1890, an arch steel truss bridge was realized. The bridge presents 300 m of apron curvature radius and, currently, is considered as one of the most important monuments of the Algerian historical heritage. Considering the age of the bridge and the evolution of the railway loads in time, it was essential to check the good behavior of the studied structure. For that, analyses to verify the physical and mechanical properties of the growth iron members are made. A finite element model of the bridge was built and numerical simulations were drawn. The structural vibration conducted analysis permit to understand the behavior of this particular structure, then to evaluate (in detail) the rate of the structure fatigue.

  14. Photographic copy of undated 12” x 36” pen and ink ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of undated 12” x 36” pen and ink drawing by Modjeski, Masters and Chase, Bridge Engineers. Illustrator Unknown. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. PEN AND INK DRAWING OF FINAL PROPOSAL OF “BRIDGE OVER THE MISSISSIPPI RIVER, NEW ORLEANS, LA.” - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  15. Seismic design guidelines for highway bridges

    NASA Astrophysics Data System (ADS)

    Mayes, R. L.; Sharpe, R. L.

    1981-10-01

    Guidelines for the seismic design of highway bridges are given. The guidelines are the recommendations of a team of nationally recognized experts which included consulting engineers, academicians, State highway, and Federal agency representatives from throughout the United States. The guidelines are comprehensive in nature and they embody several new concepts which are significant departures from existing design provisions. An extensive commentary documenting the basis for the guidelines and an example demonstrating their use are included. A draft of the guidelines was used to seismically redesign twenty-one bridges. A summary of the redesigns is included.

  16. Analysis of the Interstate 10 Twin Bridge’s collapse during Hurricane Katrina: Chapter 3D in Science and the storms-the USGS response to the hurricanes of 2005

    USGS Publications Warehouse

    Chen, Genda; Witt, Emitt C.; Hoffman, David; Luna, Ronaldo; Sevi, Adam

    2007-01-01

    The Interstate 10 Twin Span Bridge over Lake Pontchartrain north of New Orleans, La., was rendered completely unusable by Hurricane Katrina. The cause of the collapse of the bridges generated great interest among hydrologists and structural engineers as well as among the general public. What made this case study even more important was the fact that two nearby bridges sustained the effects of the same storm surge and suffered only light damage. Lessons learned from this investigation are invaluable to maintaining the safety of many of the Nation's coastal and river-crossing bridges.

  17. Damage assessment of bridge infrastructure subjected to flood-related hazards

    NASA Astrophysics Data System (ADS)

    Michalis, Panagiotis; Cahill, Paul; Bekić, Damir; Kerin, Igor; Pakrashi, Vikram; Lapthorne, John; Morais, João Gonçalo Martins Paulo; McKeogh, Eamon

    2017-04-01

    Transportation assets represent a critical component of society's infrastructure systems. Flood-related hazards are considered one of the main climate change impacts on highway and railway infrastructure, threatening the security and functionality of transportation systems. Of such hazards, flood-induced scour is a primarily cause of bridge collapses worldwide and one of the most complex and challenging water flow and erosion phenomena, leading to structural instability and ultimately catastrophic failures. Evaluation of scour risk under severe flood events is a particularly challenging issue considering that depth of foundations is very difficult to evaluate in water environment. The continual inspection, assessment and maintenance of bridges and other hydraulic structures under extreme flood events requires a multidisciplinary approach, including knowledge and expertise of hydraulics, hydrology, structural engineering, geotechnics and infrastructure management. The large number of bridges under a single management unit also highlights the need for efficient management, information sharing and self-informing systems to provide reliable, cost-effective flood and scour risk management. The "Intelligent Bridge Assessment Maintenance and Management System" (BRIDGE SMS) is an EU/FP7 funded project which aims to couple state-of-the art scientific expertise in multidisciplinary engineering sectors with industrial knowledge in infrastructure management. This involves the application of integrated low-cost structural health monitoring systems to provide real-time information towards the development of an intelligent decision support tool and a web-based platform to assess and efficiently manage bridge assets. This study documents the technological experience and presents results obtained from the application of sensing systems focusing on the damage assessment of water-hazards at bridges over watercourses in Ireland. The applied instrumentation is interfaced with an open-source platform that can offer a more economical remote monitoring solution. The results presented in this investigation provide an important guide for a multidisciplinary approach to bridge monitoring and can be used as a benchmark for the field application of cost-effective and robust sensing methods. This will deliver key information regarding the impact of water-related hazards at bridge structures through an integrated structural health monitoring and management system. Acknowledgement: The authors wish to acknowledge the financial support of the European Commission, through the Marie Curie action Industry-Academia Partnership and Pathways Network BRIDGE SMS (Intelligent Bridge Assessment Maintenance and Management System) - FP7-People-2013-IAPP- 612517.

  18. Studies on silicon NMR characterization and kinetic modeling of the structural evolution of siloxane-based materials and their applications in drug delivery and adsorption

    NASA Astrophysics Data System (ADS)

    Ambati, Jyothirmai

    This dissertation presents studies of the synthetic processes and applications of siloxane-based materials. Kinetic investigations of bridged organoalkoxysilanes that are precursors to organic-inorganic hybrid polysilsesquioxanes are a primary focus. Quick gelation despite extensive cyclization is found during the polymerization of bridged silane precursors except for silanes with certain short bridges. This work is an attempt to characterize and understand some of the distinct features of bridged silanes using experimental characterization, kinetic modeling and simulation. In addition to this, the dissertation shows how the properties of siloxane-materials can be engineered for drug delivery and adsorption. The phase behavior of polymerizing mixtures is first investigated to identify the solutions that favor kinetic characterization. Microphase separation is found to cause gradual loss of NMR signal for certain initial compositions. Distortionless Enhancement by Polarization Transfer 29Si NMR is employed to identify the products of polymerization of some short-bridged silanes under no signal loss conditions. This technique requires knowing indirect 29Si-1H scalar coupling constants which sometimes cannot be measured due to second-order effects. However, the B3LYP density functional method with 6-31G basis set is found to predict accurate 29Si- 1H coupling constants of organoalkoxysilanes and siloxanes. The scalar coupling constants thus estimated are employed to resolve non-trivial coupled NMR spectra and quantitative kinetic modeling is performed using the DEPT Si NMR transients. In order to investigate the role of the organic bridging group, the structural evolution of bridged and non-bridged silanes are compared using Monte Carlo simulations. Kinetic and simulation models suggest that cyclization plays a key role right from the onset of polymerization for bridged silanes even more than in non-bridged silanes. The simulations indicate that the carbosiloxane rings formed from short-bridged precursors slow down but do not prevent gelation. The tuning of siloxane-based materials for adsorption technologies are also discussed here. In the first example, antioxidant enzyme loading is investigated as a means to reduce oxidative stress generated by silica nanoparticle drug carriers. Materials are engineered for promising enzyme loading and protection from proteolysis. Second, the potential of copper sulfate impregnation to enhance adsorption of ammonia by silica is explored by molecular simulation. KEYWORDS: Sol-gel Polymerization, Kinetic Investigation, Si NMR, Bridged Silanes, DFT Calculations.

  19. Hybrid semi-parametric mathematical systems: bridging the gap between systems biology and process engineering.

    PubMed

    Teixeira, Ana P; Carinhas, Nuno; Dias, João M L; Cruz, Pedro; Alves, Paula M; Carrondo, Manuel J T; Oliveira, Rui

    2007-12-01

    Systems biology is an integrative science that aims at the global characterization of biological systems. Huge amounts of data regarding gene expression, proteins activity and metabolite concentrations are collected by designing systematic genetic or environmental perturbations. Then the challenge is to integrate such data in a global model in order to provide a global picture of the cell. The analysis of these data is largely dominated by nonparametric modelling tools. In contrast, classical bioprocess engineering has been primarily founded on first principles models, but it has systematically overlooked the details of the embedded biological system. The full complexity of biological systems is currently assumed by systems biology and this knowledge can now be taken by engineers to decide how to optimally design and operate their processes. This paper discusses possible methodologies for the integration of systems biology and bioprocess engineering with emphasis on applications involving animal cell cultures. At the mathematical systems level, the discussion is focused on hybrid semi-parametric systems as a way to bridge systems biology and bioprocess engineering.

  20. Assessing potential scour using the South Carolina bridge-scour envelope curves

    USGS Publications Warehouse

    Benedict, Stephen T.; Feaster, Toby D.; Caldwell, Andral W.

    2016-09-30

    SummaryBridge-scour equations presented in the Federal Highway Administration Hydraulic Engineering Circular No. 18 reflect the current state-of-the practice for predicting scour at bridges. Although these laboratory-derived equations provide an important resource for assessing scour potential, there is a measure of uncertainty when applying these equations to field conditions. The uncertainty and limitations have been acknowledged by laboratory researchers and confirmed in field investigations.Because of the uncertainty associated with bridge-scour equations, HEC-18 recommends that engineers evaluate the computed scour depths obtained from the equations and modify the resulting data if they appear unreasonable. Perhaps the best way to evaluate the reasonableness of predicted scour is to compare it to field measurements of historic scour. Historic field data show scour depths resulting from high flows and provide a reference for evaluating predicted scour. It is rare, however, that such data are available at or near a site of interest, making the evaluation of predicted scour as compared to field data difficult if not impossible. Realizing the value of historic scour measurements, the U.S. Geological Survey (USGS), in cooperation with the South Carolina Department of Transportation (SCDOT), conducted a series of three field investigations to collect historic scour data with the goal of understanding regional trends of scour at riverine bridges in South Carolina.Historic scour measurements, including measurements of clear-water abutment, contraction, and pier scour, as well as live-bed contraction and pier scour, were made at more than 200 bridges. These field investigations provided valuable insights into regional scour trends and yielded regional bridge-scour envelope curves that can be used as supplementary tools for assessing all components of scour at riverine bridges in South Carolina.The application and limitations of these envelope curves were documented in four reports. Because each report addresses different components of bridge scour, it was recognized that there was a need to develop an integrated procedure for applying the envelope curves to help assess scour potential at riverine bridges in South Carolina. The result of that effort is detailed in Benedict and others (2016) and summarized in this fact sheet.

  1. 77 FR 33094 - Safety Zone; International Bridge 50th Anniversary Celebration Fireworks, St. Mary's River, U.S...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    .... Army Corps of Engineers Locks, Sault Sainte Marie, MI AGENCY: Coast Guard, DHS. ACTION: Temporary final... Fireworks, St Mary's River, U.S. Army Corps of Engineers Locks, Sault Sainte Marie, MI; in the Federal... celebration, fireworks will be launched from the northeast pier of the U.S. Army Corp of Engineers Soo Locks...

  2. 23 CFR 661.37 - What are the funding limitations on individual IRRBP projects?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.37 What are the funding..., with a $150,000 maximum limit for PE. (b) An IRRBP eligible non-BIA owned IRR bridge is eligible for up to 80 percent IRRBP funding, with a $150,000 maximum limit for PE and $1,000,000 maximum limit for...

  3. 23 CFR 661.37 - What are the funding limitations on individual IRRBP projects?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.37 What are the funding..., with a $150,000 maximum limit for PE. (b) An IRRBP eligible non-BIA owned IRR bridge is eligible for up to 80 percent IRRBP funding, with a $150,000 maximum limit for PE and $1,000,000 maximum limit for...

  4. 23 CFR 661.37 - What are the funding limitations on individual IRRBP projects?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.37 What are the funding..., with a $150,000 maximum limit for PE. (b) An IRRBP eligible non-BIA owned IRR bridge is eligible for up to 80 percent IRRBP funding, with a $150,000 maximum limit for PE and $1,000,000 maximum limit for...

  5. 23 CFR 661.37 - What are the funding limitations on individual IRRBP projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.37 What are the funding..., with a $150,000 maximum limit for PE. (b) An IRRBP eligible non-BIA owned IRR bridge is eligible for up to 80 percent IRRBP funding, with a $150,000 maximum limit for PE and $1,000,000 maximum limit for...

  6. 23 CFR 661.37 - What are the funding limitations on individual IRRBP projects?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.37 What are the funding..., with a $150,000 maximum limit for PE. (b) An IRRBP eligible non-BIA owned IRR bridge is eligible for up to 80 percent IRRBP funding, with a $150,000 maximum limit for PE and $1,000,000 maximum limit for...

  7. PBF detail of metal pedestrian bridge over exposed control cables, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF detail of metal pedestrian bridge over exposed control cables, which run between Control (PER-619) and Reactor Buildings (PER-620). Camera facing northwest. Southwest corner of PER-620 at upper right of view. Date: May 2004. INEEL negative no. HD-41-6-3 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  8. 34. VERTICAL AND TORSIONAL MOTION VIEWED FROM EAST TOWER, 7 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. VERTICAL AND TORSIONAL MOTION VIEWED FROM EAST TOWER, 7 NOVEMBER 1940, FROM 16MN FILM SHOT BY PROFESSOR F.B. FARQUHARSON, UNIVERSITY OF WASHINGTON. (LABORATORY STUDIES ON THE TACOMA NARROWS BRIDGE, AT UNIVERSITY OF WASHINGTON (SEATTLE: UNIVERSITY OF WASHINGTON, DEPARTMENT OF CIVIL ENGINEERING, 1941) - Tacoma Narrows Bridge, Spanning Narrows at State Route 16, Tacoma, Pierce County, WA

  9. 33. VERTICAL AND TORSIONAL OSCILLATIONS, 3/4 VIEW, 7 NOVEMBER 1940, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. VERTICAL AND TORSIONAL OSCILLATIONS, 3/4 VIEW, 7 NOVEMBER 1940, FROM 16MN FILM SHOT BY PROFESSOR F.B. FARQUHARSON, UNIVERSITY OF WASHINGTON. (LABORATORY STUDIES ON THE TACOMA NARROWS BRIDGE, AT UNIVERSITY OF WASHINGTON (SEATTLE: UNIVERSITY OF WASHINGTON, DEPARTMENT OF CIVIL ENGINEERING, 1941) - Tacoma Narrows Bridge, Spanning Narrows at State Route 16, Tacoma, Pierce County, WA

  10. 16. PHOTOCOPY OF HISTORIC VIEW, HALFTONE PLATE DEPICTING CONSTRUCTION OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. PHOTOCOPY OF HISTORIC VIEW, HALF-TONE PLATE DEPICTING CONSTRUCTION OF BOSTON STREET BRIDGE, DATED DECEMBER 21, 1901, AND SHOWING CONCENTRIC RING OR ROWLOCK BOND CONSTRUCTION TECHNIQUE (HALF-TONE PLATE PUBLISHED IN BALTIMORE CITY ENGINEER'S ANNUAL REPORT FOR 1901, COURTESY ENOCH PRATT FREE LIBRARY) - Boston Street Bridge, Spanning Harris Creek Sewer at Boston Street, Baltimore, Independent City, MD

  11. Full-scale monitoring of wind and suspension bridge response

    NASA Astrophysics Data System (ADS)

    Snæbjörnsson, J. T.; Jakobsen, J. B.; Cheynet, E.; Wang, J.

    2017-12-01

    Monitoring of real structures is important for many reasons. For structures susceptible to environmental actions, full-scale observations can provide valuable information about the environmental conditions at the site, as well as the characteristics of the excitation acting on the structure. The recorded data, if properly analyzed, can be used to validate and/or update experiments and models used in the design of new structures, such as the load description and modelling of the structural response. Various aspects of full-scale monitoring are discussed in the paper and the full-scale wind engineering laboratory at the Lysefjord suspension bridge introduced. The natural excitation of the bridge comes from wind and traffic. The surrounding terrain is complex and its effect on the wind flow can only be fully studied on site, in full-scale. The monitoring program and associated data analysis are described. These include various studies of the relevant turbulence characteristics, identification of dynamic properties and estimation of wind- and traffic-induced response parameters. The overall monitoring activity also included a novel application of the remote optical sensing in bridge engineering, which is found to have an important potential to complement traditional “single-point” wind observations by sonic anemometers.

  12. Role to Be Played by Independent Geotechnical Supervision in the Foundation for Bridge Construction

    NASA Astrophysics Data System (ADS)

    Sobala, Dariusz; Rybak, Jarosław

    2017-10-01

    Some remarks concerning the necessity of employing an independent and over all ethical geotechnical survey were presented in the paper. Starting from the design phase, through the whole construction process, the importance of geotechnical engineer is stated in legal acts. Numerous testing technologies serve for the calibration of geotechnical technologies and allow for confirming the quality and capacity of piles. Special emphasis was payed to the involvement of scientifical and research institutions which can not only serve services but also can postprocess and methodize collected data. Such databases enable for new codes, methods and recommendations. Selection of deep foundations for bridge-type structures is most often dependent on complex geotechnical conditions, concentrated loads and constraints for pier displacements. Besides the last ones, prior to more common introduction of the design-construct system, could be a convenient justification for design engineer, who imposed deep foundation because he did not want or was not able to estimate the effect of pier settlement on civil engineering structure. The paper provides some notes about the need to engage a geotechnical supervising service of high competency and ethical quality during engineering and construction stages of foundations for bridge-type structures where legal requirements are of special consideration. Successive stages of projects are reviewed and research methods used for current calibration of geotechnical technologies and verification of geotechnical work quality are analysed. Special attention is given to potential involvement of independent R&D institutions which, apart from rendering specific services, also collect and systemize the research results thus enabling, in the long term, to revise engineering standards, instructions and guidelines.

  13. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 23, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, view of channel excavation downstream at Fourth Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  14. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 19, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, view of WPA masonry wall and dike upstream from Central Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  15. Photographic copy of historic photograph, by Corps of Engineers, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 24, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, view of channel excavation upstream at Franklin Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA

  16. 41. PHOTOGRAPHY OF BLUE PRINT (MINNEAPOLIS CITY ENGINEER) END AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. PHOTOGRAPHY OF BLUE PRINT (MINNEAPOLIS CITY ENGINEER) END AND CENTRE CASTING OF CAST STEEL, MASONRY CASTING OF CAST IRON CASTING, FOR MINNEAPOLIS STEEL ARCH (4 x 5 negative) - Steel Arch Bridge, Hennepin Avenue spanning west channel of Mississippi River, Minneapolis, Hennepin County, MN

  17. Tsunamis: bridging science, engineering and society.

    PubMed

    Kânoğlu, U; Titov, V; Bernard, E; Synolakis, C

    2015-10-28

    Tsunamis are high-impact, long-duration disasters that in most cases allow for only minutes of warning before impact. Since the 2004 Boxing Day tsunami, there have been significant advancements in warning methodology, pre-disaster preparedness and basic understanding of related phenomena. Yet, the trail of destruction of the 2011 Japan tsunami, broadcast live to a stunned world audience, underscored the difficulties of implementing advances in applied hazard mitigation. We describe state of the art methodologies, standards for warnings and summarize recent advances in basic understanding, and identify cross-disciplinary challenges. The stage is set to bridge science, engineering and society to help build up coastal resilience and reduce losses. © 2015 The Author(s).

  18. Numerical Simulations Of High-Altitude Aerothermodynamics Of A Prospective Spacecraft Model

    NASA Astrophysics Data System (ADS)

    Vashchenkov, P. V.; Kaskovsky, A. V.; Krylov, A. N.; Ivanov, M. S.

    2011-05-01

    The paper describes the computations of aerothermodynamic characteristics of a promising spacecraft (Prospective Piloted Transport System) along its de- scent trajectory at altitudes from 120 to 60 km. The computations are performed by the DSMC method with the use of the SMILE software system and by the engineering technique (local bridging method) with the use of the RuSat software system. The influence of real gas effects (excitation of rotational and vibrational energy modes and chemical reactions) on aerothermodynamic characteristics of the vehicle is studied. A comparison of results obtained by the approximate engineering method and the DSMC method allow the accuracy of prediction of aerodynamic characteristics by the local bridging method to be estimated.

  19. 4. INTERIOR OF ENGINE ROOM, CONTAINING UNITEDTOD TWINTANDEM ENGINE, FOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. INTERIOR OF ENGINE ROOM, CONTAINING UNITED-TOD TWIN-TANDEM ENGINE, FOR 40" BLOOMING MILL; AS SEEN FROM THE UPPER LEVEL BRIDGE CRANE, THIS ENGINE WAS THE DIRECT DRIVE TO THE 40" BLOOMING MILL LOCATED IN THE ADJACENT ROOM TO THE LEFT. THE UNITED-TOD ENGINE, A TWIN TANDEM COMPOUND STEAM ENGINE, WAS RATED AT 20,000 MP. IN 1946 NEW HIGH PRESSURE CYLINDERS WERE INSTALLED AND THE ENGINE RAN ON 200 PSI STEAM, WITH A 44"X76"X60" STROKE, TO A BUILT-UP COUNTER-BALANCED CENTER CRANK. - Republic Iron & Steel Company, Youngstown Works, Blooming Mill & Blooming Mill Engines, North of Poland Avenue, Youngstown, Mahoning County, OH

  20. Strengthening the Link between Theory and Practice in Teaching Design Engineering: An Empirical Study on a New Approach

    ERIC Educational Resources Information Center

    Tempelman, E.; Pilot, A.

    2011-01-01

    In 2007, the Faculty of Industrial Design Engineering of the Delft University of Technology introduced a new bachelor program. Based on theories of learning and instruction three design principles were used to develop an approach that aims to make it easier for students to bridge the gap between theoretical design engineering courses and practical…

  1. Load Distribution Factors for Composite Multicell Box Girder Bridges

    NASA Astrophysics Data System (ADS)

    Tiwari, Sanjay; Bhargava, Pradeep

    2017-12-01

    Cellular steel section composite with a concrete deck is one of the most suitable superstructures in resisting torsional and warping effects induced by highway loading. This type of structure has inherently created new design problems for engineers in estimating its load distribution when subjected to moving vehicles. Indian Codes of Practice does not provide any specific guidelines for the design of straight composite concrete deck-steel multi-cell bridges. To meet the practical requirements arising during the design process, a simple design method is needed for straight composite multi-cell bridges in the form of load distribution factors for moment and shear. This work presents load distribution characteristics of straight composite multi-cell box girder bridges under IRC trains of loads.

  2. Building Better Bridges into STEM: A Synthesis of 25 Years of Literature on STEM Summer Bridge Programs.

    PubMed

    Ashley, Michael; Cooper, Katelyn M; Cala, Jacqueline M; Brownell, Sara E

    2017-01-01

    Summer bridge programs are designed to help transition students into the college learning environment. Increasingly, bridge programs are being developed in science, technology, engineering, and mathematics (STEM) disciplines because of the rigorous content and lower student persistence in college STEM compared with other disciplines. However, to our knowledge, a comprehensive review of STEM summer bridge programs does not exist. To provide a resource for bridge program developers, we conducted a systematic review of the literature on STEM summer bridge programs. We identified 46 published reports on 30 unique STEM bridge programs that have been published over the past 25 years. In this review, we report the goals of each bridge program and whether the program was successful in meeting these goals. We identify 14 distinct bridge program goals that can be organized into three categories: academic success goals, psychosocial goals, and department-level goals. Building on the findings of published bridge reports, we present a set of recommendations for STEM bridge programs in hopes of developing better bridges into college. © 2017 M. Ashley, K. M. Cooper, et al. CBE—Life Sciences Education © 2017 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  3. Design of pedestrian truss bridge with Sengon-Rubber laminated veneer lumber

    NASA Astrophysics Data System (ADS)

    Herbudiman, B.; Pranata, Y. A.; Pangestu, L.

    2017-12-01

    Timber bridges are one of the bridge that has long been used, but nowadays, large dimension of sawn timber has limited supply and also it is not environmental-friendly. Laminated veneer lumber (LVL) is a engineered wood that becomes one of the promising alternative, because it is made from lower quality wood that processed to be used as a more quality one. The bridge planned to be a pedestrian truss bridge with length of 9 m, width of 3 m, height of 2.5 m, and using bolt and steel plate as its connection system. Mechanical properties of LVL obtained directly from laboratory test result. Bridge modeling and planning for wood construction refers to SNI 7973:2013, while the loading refers to SNI 1725:2016. Based on the modelling and calculation, the dimension of truss frame and girder beam which are 9 cm x 9 cm and 9 cm x 18 cm have adequate strengths and satisfy deflection requirement.

  4. Dynamic and Fatigue Analysis of an 18{sup th} Century Steel Arch Bridge

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boumechra, Nadir; Hamdaoui, Karim

    2008-07-08

    Within the 'Oran-Tlemcen' railway line realization project (159 km), several bridges were built by the Railroads Algerian West Company. 7 km from the east of Tlemcen city, this railway line must cross a very broken mountainous collar, that's why the French engineer 'Gustave Eiffel' was solicited to construct a 68 m length bridge. In 1890, an arch steel truss bridge was realized. The bridge presents 300 m of apron curvature radius and, currently, is considered as one of the most important monuments of the Algerian historical heritage. Considering the age of the bridge and the evolution of the railway loadsmore » in time, it was essential to check the good behavior of the studied structure. For that, analyses to verify the physical and mechanical properties of the growth iron members are made. A finite element model of the bridge was built and numerical simulations were drawn. The structural vibration conducted analysis permit to understand the behavior of this particular structure, then to evaluate (in detail) the rate of the structure fatigue.« less

  5. Research on Damage Identification of Bridge Based on Digital Image Measurement

    NASA Astrophysics Data System (ADS)

    Liang, Yingjing; Huan, Shi; Tao, Weijun

    2017-12-01

    In recent years, the number of the damage bridge due to excessive deformation gradually increased, which caused significant property damage and casualties. Hence health monitoring and the damage detection of the bridge structure based on the deflection measurement are particularly important. The current conventional deflection measurement methods, such as total station, connected pipe, GPS, etc., have many shortcomings as low efficiency, heavy workload, low degree of automation, operating frequency and working time constrained. GPS has a low accuracy in the vertical displacement measurement and cannot meet the dynamic measured requirements of the current bridge engineering. This paper presents a bridge health monitoring and damage detection technology based on digital image measurement method in which the measurement accuracy is sub-millimeter level and can achieve the 24-hour automatic non-destructive monitoring for the deflection. It can be concluded from this paper that it is feasible to use digital image measurement method for identification of the damage in the bridge structure, because it has been validated by the theoretical analysis, the laboratory model and the application of the real bridge.

  6. BIM authoring for an image-based bridge maintenance system of existing cable-supported bridges

    NASA Astrophysics Data System (ADS)

    Dang, N. S.; Shim, C. S.

    2018-04-01

    Infrastructure nowadays is increasingly become the main backbone for the metropolitan development in general. Along with the rise of new facilities, the demand in term of maintenance for the existing bridges is indispensable. Recently, the terminology of “preventive maintenance” is not unfamiliar with the engineer, literally is the use of a bridge maintenance system (BMS) based on a BIM-oriented model. In this paper, the process of generating a BMS based on BIM model is introduced in detail. Data management for this BMS is separated into two modules: site inspection system and information management system. The noteworthy aspect of this model lays on the closed and automatic process of “capture image, generate the technical damage report, and upload/feedback to the BMS” in real-time. A pilot BMS system for a cable-supported bridge is presented which showed a good performance and potential to further development of preventive maintenance.

  7. Tissue engineered constructs for peripheral nerve surgery

    PubMed Central

    Johnson, P. J.; Wood, M. D.; Moore, A. M.; Mackinnon, S. E.

    2013-01-01

    Summary Background Tissue engineering has been defined as “an interdisciplinary field that applies the principles of engineering and life sciences toward the development of biological substitutes that restore, maintain, or improve tissue function or a whole organ”. Traumatic peripheral nerve injury resulting in significant tissue loss at the zone of injury necessitates the need for a bridge or scaffold for regenerating axons from the proximal stump to reach the distal stump. Methods A review of the literature was used to provide information on the components necessary for the development of a tissue engineered peripheral nerve substitute. Then, a comprehensive review of the literature is presented composed of the studies devoted to this goal. Results Extensive research has been directed toward the development of a tissue engineered peripheral nerve substitute to act as a bridge for regenerating axons from the proximal nerve stump seeking the distal nerve. Ideally this nerve substitute would consist of a scaffold component that mimics the extracellular matrix of the peripheral nerve and a cellular component that serves to stimulate and support regenerating peripheral nerve axons. Conclusions The field of tissue engineering should consider its challenge to not only meet the autograft “gold standard” but also to understand what drives and inhibits nerve regeneration in order to surpass the results of an autograft. PMID:24385980

  8. Computational mechanics research and support for aerodynamics and hydraulics at TFHRC, year 2 quarter 1 progress report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lottes, S.A.; Bojanowski, C.; Shen, J.

    2012-04-09

    The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. Themore » analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water effects on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to improve design allowing for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, CFD analysis of the operation of the wind tunnel in the TFHRC wind engineering laboratory. This quarterly report documents technical progress on the project tasks for the period of October through December 2011.« less

  9. Computational mechanics research and support for aerodynamics and hydraulics at TFHRC, year 2 quarter 2 progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lottes, S.A.; Bojanowski, C.; Shen, J.

    2012-06-28

    The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. Themore » analysis methods employ well benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water effects on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to improve design allowing for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, CFD analysis of the operation of the wind tunnel in the TFHRC wind engineering laboratory. This quarterly report documents technical progress on the project tasks for the period of January through March 2012.« less

  10. Design and Implementation of a New System for Large Bridge Monitoring—GeoSHM

    PubMed Central

    Xie, Yilin; Ince, Sean; Ye, Jun; Bhatia, Paul

    2018-01-01

    Structural Health Monitoring (SHM) is a relatively new branch of civil engineering that focuses on assessing the health status of infrastructure, such as long-span bridges. Using a broad range of in-situ monitoring instruments, the purpose of the SHM is to help engineers understand the behaviour of structures, ensuring their structural integrity and the safety of the public. Under the Integrated Applications Promotion (IAP) scheme of the European Space Agency (ESA), a feasibility study (FS) project that used the Global Navigation Satellite Systems (GNSS) and Earth Observation (EO) for Structural Health Monitoring of Long-span Bridges (GeoSHM) was initiated in 2013. The GeoSHM FS Project was led by University of Nottingham and the Forth Road Bridge (Scotland, UK), which is a 2.5 km long suspension bridge across the Firth of Forth connecting Edinburgh and the Northern part of Scotland, was selected as the test structure for the GeoSHM FS project. Initial results have shown the significant potential of the GNSS and EO technologies. With these successes, the FS project was further extended to the demonstration stage, which is called the GeoSHM Demo project where two other long-span bridges in China were included as test structures. Led by UbiPOS UK Ltd. (Nottingham, UK), a Nottingham Hi-tech company, this stage focuses on addressing limitations identified during the feasibility study and developing an innovative data strategy to process, store, and interpret monitoring data. This paper will present an overview of the motivation and challenges of the GeoSHM Demo Project, a description of the software and hardware architecture and a discussion of some primary results that were obtained in the last three years. PMID:29510534

  11. System Engineering Analysis of Topside Cranes Installed on AD, AR, and AS Class Ships

    DTIC Science & Technology

    1982-02-06

    4 severity CASREPs. Water or moisture in oumzs or motors accounted for five CASREPs; moisture in a transformer caused a class C fire , which resulted...Components of Bridge Cranes, Monorail Hoist Systems, and Side Port Hoists Associated Equipment: Accumulators Ladders Speed reducers Brakes Load blocks...Switches Bridge Locking devices *Tow bars Bumpers * Monorails Tracks Collector assembly Motors (electrical *Trolley buses Controller and hydraulic) *Trolleys

  12. Optimizing Observations of Sea Ice Thickness and Snow Depth in the Arctic

    DTIC Science & Technology

    2015-09-30

    Region Research and Engineering Laboratory (CRREL), Naval Research Laboratory (NRL) and National Aeronautics and Space Administration ( NASA ) in...and results from this focused effort with data collected during related national and international activities (e.g. other NASA IceBridge sea ice...surface elevation of the snow or ice/air interface, and radar altimetry measurements of the snow/ice interface, taken by NASA IceBridge and NRL

  13. 13. 'Transverse Bracing for 1 208'101/2' C. to C. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. 'Transverse Bracing for 1 - 208'-10-1/2' C. to C. End Pins S. Tr. Thro. Skew Span, 6th Crossing of Sacramento River, So. Pac. Co., The Phoenix Bridge Co., C.O. 836D, Drawing No. 7, Scale - 1' = 1', Engineer - B.M. Krohn, May 11th `01, Slaughter' - Southern Pacific Railroad Shasta Route, Bridge No. 301.85, Milepost 301.85, Pollard Flat, Shasta County, CA

  14. 13. 'Portal and Transverse Bracing, 1 180'01/4' c. to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. 'Portal and Transverse Bracing, 1 - 180'-0-1/4' c. to c. end pins S. Tr. Thro. Truss Span, 16th Crossing Sacramento River, Sacramento Division, So. Pac. Co., The Phoenix Bridge Co., C.O. #842, Draw #6, Engineer C. Scheidl, Draftsman Hermanns, Scale 1' = 1', Apr. 26, 1901.' - Southern Pacific Railroad Shasta Route, Bridge No. 324.99, Milepost 324.99, Shasta Springs, Siskiyou County, CA

  15. Use of Laser Scanning Technology to Obtain As-Built Records of Historic Covered Bridges

    Treesearch

    Robert J. Ross; Brian K. Brashaw; Samuel J. Anderson

    2012-01-01

    Covered bridges are part of the fabric of American history. Although much effort is expended to preserve these structures, many are lost forever. The National Park Service’s Historic American Engineering Record (HAER) has efforts under way to document historic structures. Their Level I documentation is defined in the Secretary of the Interior’s Standards and Guidelines...

  16. Detail of plaque beneath column on the south parapet at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail of plaque beneath column on the south parapet at the west end of the bridge. The plaque reads “1914; Mayor E.J. Drussel; Councilmen E.S. Henry, E.F. Hogan, R.P. Lamdin, C.F. Ross, J.H. Shuppert; Leonard & Day, Engineers; C.H. Gildersleeve, Builder.” - First Street Bridge, Spanning Napa River at First Street between Soscol Avenue & Juarez Street, Napa, Napa County, CA

  17. Project-Based Learning to Enhance Teaching Embedded Systems

    ERIC Educational Resources Information Center

    Sababha, Belal H.; Alqudah, Yazan A.; Abualbasal, Abdelraheem; AlQaralleh, Esam A.

    2016-01-01

    Exposing engineering students during their education to real-world problems and giving them the chance to apply what they learn in the classroom is a vital element of engineering education. The Embedded Systems course at Princess Sumaya University for Technology (PSUT) is one of the main courses that bridge the gap between theoretical electrical…

  18. A Modular Approach to Integrating Biofuels Education into ChE Curriculum Part I--Learning Materials

    ERIC Educational Resources Information Center

    He, Q. Peter; Wang, Jin; Zhang, Rong; Johnson, Donald; Knight, Andrew; Polala, Ravali

    2016-01-01

    In view of potential demand for skilled engineers and competent researchers in the biofuels field, we have identified a significant gap between advanced biofuels research and undergraduate biofuels education in chemical engineering. To help bridge this gap, we created educational materials that systematically integrate biofuels technologies into…

  19. State Analysis: A Control Architecture View of Systems Engineering

    NASA Technical Reports Server (NTRS)

    Rasmussen, Robert D.

    2005-01-01

    A viewgraph presentation on the state analysis process is shown. The topics include: 1) Issues with growing complexity; 2) Limits of common practice; 3) Exploiting a control point of view; 4) A glimpse at the State Analysis process; 5) Synergy with model-based systems engineering; and 6) Bridging the systems to software gap.

  20. Summer Study in Engineering for High School Women.

    ERIC Educational Resources Information Center

    Goldberg, Julie L.; Sedlacek, William E.

    The transition between high school and college is a crucial point where many young women engaged in the applied sciences and engineering cease their participation. To help retain young women's interest and help bridge the gap between secondary school and higher education, The University of Maryland, College Park, held a six-week live-in academic…

  1. Implementing Problem Based Learning through Engineers without Borders Student Projects

    ERIC Educational Resources Information Center

    Wittig, Ann

    2013-01-01

    Engineers Without Borders USA (EWB) is a nonprofit organization that partners student chapters with communities in fundamental need of potable water, clean air, sanitation, irrigation, energy, basic structures for schools and clinics, roads and bridges, etc. While EWB projects may vary in complexity, they are all realistic, ill-structured and…

  2. Effect of synthetic auxin herbicides on seed development and viability in genetically-engineered glyphosate-resistant alfalfa

    USDA-ARS?s Scientific Manuscript database

    Feral populations of cultivated crops have the potential to function as bridges and reservoirs that contribute to the unwanted movement of novel genetically engineered (GE) traits. Recognizing that feral alfalfa has the potential to lower genetic purity in alfalfa seed production fields when it is g...

  3. Study on energy consumption evaluation of mountainous highway based on LCA

    NASA Astrophysics Data System (ADS)

    Fei, Lunlin; Zhang, Qi; Xie, Yongqing

    2017-06-01

    For the system to understand the road construction energy consumption process, this paper selects a typical mountainous highway in the south, using the theory and method of Life Cycle Assessment (LCA) to quantitatively study the energy consumption of the whole process of highway raw materials production, construction and operation. The results show that the energy consumption in the raw material production stage is the highest, followed by the highway operation and construction stage. The energy consumption per unit of tunnel engineering, bridge engineering, roadbed engineering and pavement engineering in the construction phase are 2279.00 tce, 1718.07 tce, 542.19 tce and 34.02 tce, and in operational phase, 85.44% of electricity consumption comes from tunnel ventilation and lighting. Therefore, in the bridge and tunnel construction process, we should promote energy-saving innovation of the construction technology and mechanical equipment, and further strengthen the research and development of tunnel ventilation, lighting energy-saving equipment and intelligent control technology, which will help significantly reduce the energy consumption and greenhouse gas emissions of the life cycle of highway.

  4. Establishment of Kansei Database and Application to Design for Consensus Building

    NASA Astrophysics Data System (ADS)

    Yasuda, Keiichi; Shiraki, Wataru

    Reflecting the recent social background where the importance of bridge landscape design is recognized and the new business style of citizen-involved infrastructure development has started, there has been a growing need of design where aesthetic feeling of actual users is reflected. In this research, a focus has been placed on the Kansei engineering technique where users' needs are reflected on product development. A questionnaire survey has been conducted for bridge engineers who are most intensively involved in design work and students as actual users. The result was analyzed by factor analysis and the Hayashi's quantification methods (category I). A tool required at consensus-building occasions has been created to change design elements and display accompanying evaluation difference while using the Kansei database.

  5. Disulfide Bridges: Bringing Together Frustrated Structure in a Bioactive Peptide.

    PubMed

    Zhang, Yi; Schulten, Klaus; Gruebele, Martin; Bansal, Paramjit S; Wilson, David; Daly, Norelle L

    2016-04-26

    Disulfide bridges are commonly found covalent bonds that are usually believed to maintain structural stability of proteins. Here, we investigate the influence of disulfide bridges on protein dynamics through molecular dynamics simulations on the cysteine-rich trypsin inhibitor MCoTI-II with three disulfide bridges. Correlation analysis of the reduced cyclic peptide shows that two of the three disulfide distances (Cys(11)-Cys(23) and Cys(17)-Cys(29)) are anticorrelated within ∼1 μs of bridge formation or dissolution: when the peptide is in nativelike structures and one of the distances shortens to allow bond formation, the other tends to lengthen. Simulations over longer timescales, when the denatured state is less structured, do not show the anticorrelation. We propose that the native state contains structural elements that frustrate one another's folding, and that the two bridges are critical for snapping the frustrated native structure into place. In contrast, the Cys(4)-Cys(21) bridge is predicted to form together with either of the other two bridges. Indeed, experimental chromatography and nuclear magnetic resonance data show that an engineered peptide with the Cys(4)-Cys(21) bridge deleted can still fold into its near-native structure even in its noncyclic form, confirming the lesser role of the Cys(4)-Cys(21) bridge. The results highlight the importance of disulfide bridges in a small bioactive peptide to bring together frustrated structure in addition to maintaining protein structural stability. Copyright © 2016 Biophysical Society. Published by Elsevier Inc. All rights reserved.

  6. Towards Large-Scale, Non-Destructive Inspection of Concrete Bridges

    NASA Astrophysics Data System (ADS)

    Mahmoud, A.; Shah, A. H.; Popplewell, N.

    2005-04-01

    It is estimated that the rehabilitation of deteriorating engineering infrastructure in the harsh North American environment could cost billions of dollars. Bridges are key infrastructure components for surface transportation. Steel-free and fibre-reinforced concrete is used increasingly nowadays to circumvent the vulnerability of steel rebar to corrosion. Existing steel-free and fibre-reinforced bridges may experience extensive surface-breaking cracks that need to be characterized without incurring further damage. In the present study, a method that uses Lamb elastic wave propagation to non-destructively characterize cracks in plain as well as fibre-reinforced concrete is investigated both numerically and experimentally. Numerical and experimental data are corroborated with good agreement.

  7. DEVELOPMENTAL BIOLOGY

    PubMed Central

    Schatten, Gerald; Mitalipov, Shoukhrat

    2009-01-01

    Genetically engineered monkeys carrying a foreign gene that is passed on to their offspring provide a potentially valuable bridge between mouse models of disease and treatment for human disorders. PMID:19478771

  8. Assessment of factors impacting success for incoming college engineering students in a summer bridge program

    NASA Astrophysics Data System (ADS)

    Reisel, John R.; Jablonski, Marissa; Hosseini, Hossein; Munson, Ethan

    2012-06-01

    A summer bridge program for incoming engineering and computer science freshmen has been used at the University of Wisconsin-Milwaukee from 2007 to 2010. The primary purpose of this program has been to improve the mathematics course placement for incoming students who initially place into a course below Calculus I on the math placement examination. The students retake the university's math placement examination after completing the bridge program to determine if they then place into a higher-level mathematics course. If the students improve their math placement, the program is considered successful for that student. The math portion of the bridge program is designed around using the ALEKS software package for targeted, self-guided learning. In the 2007 and 2008 versions of the program, both an on-line version and an on-campus version with additional instruction were offered. In 2009 and 2010, the program was exclusively in an on-campus format, and also featured a required residential component and additional engineering activities for the students. From the results of these four programs, we are able to evaluate the success of the program in its different formats. In addition, data has been collected and analysed regarding the impact of other factors on the program's success. The factors include student preparation before the beginning of the program (as measured by math ACT scores) and the amount of time the student spent working on the material during the program. Better math preparation and the amount of time spent on the program were found to be good indicators of success. Furthermore, the on-campus version of the program is more effective than the on-line version.

  9. Engineering Design Activity: Understanding How Different Design Activities Influence Students' Motivation in Grades 9-12. Final Report. A Seed Grant Research Project. Research in Engineering and Technology Education

    ERIC Educational Resources Information Center

    Lawanto, Oenardi; Stewardson, Gary

    2009-01-01

    The objective of this study was to evaluate grade 9-12 students' motivation while engaged in two different engineering design projects: marble-sorter and bridge designs. The motivation components measured in this study were focused on students' intrinsic (IGO) and extrinsic (EGO) goal orientations, task value (TV), self-efficacy for learning and…

  10. 35. VERTICAL AND TORSIONAL MOTION FROM EAST TOWER SHOWING ANGULAR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. VERTICAL AND TORSIONAL MOTION FROM EAST TOWER SHOWING ANGULAR DISTORTION APPROACHING 45 DEGREES WITH LAMP POSTS APPEARING TO BE AT EIGHT ANGLES, 7 NOVEMBER 1940, FROM 16MN FILM SHOT BY PROFESSOR F.B. FARQUHARSON, UNIVERSITY OF WASHINGTON. (LABORATORY STUDIES ON THE TACOMA NARROWS BRIDGE, AT UNIVERSITY OF WASHINGTON SEATTLE: UNIVERSITY OF WASHINGTON, DEPARTMENT OF CIVIL ENGINEERING, 1941) - Tacoma Narrows Bridge, Spanning Narrows at State Route 16, Tacoma, Pierce County, WA

  11. Earth Observations taken by the Expedition Seven crew

    NASA Image and Video Library

    2003-06-25

    ISS007-E-08251 (25 June 2003) --- This photo featuring the San Francisco Bay area in California was photographed from the International Space Station (ISS) by astronaut Edward T. Lu, Expedition 7 NASA ISS science officer and flight engineer. The San Francisco Bay Bridge, Alcatraz Island, Golden Gate Bridge, and Golden Gate Park are visible at upper right. Stanford University and red salt ponds on the bay near Fremont at lower left.

  12. A Computational Model to Simulate Groundwater Seepage Risk in Support of Geotechnical Investigations of Levee and Dam Projects

    DTIC Science & Technology

    2013-03-01

    Allen 1974, 1978; Bridge and Leeder 1979; Mackey and Bridge 1992) that computes synthetic stratigraphy for a floodplain cross section. The model...typical of that used to record and communicate geologic information for engineering applications. The computed stratigraphy differentiates between...belt dimensions measured for two well-studied river systems: (A) the Linge River within the Rhine-Meuse Delta , Netherlands, and (B) the Lower

  13. 12. 'Portal Strut for 1 208'101/2' C. to C. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. 'Portal Strut for 1 - 208'-10-1/2' C. to C. End Pins S. Tr. Thro. Skew Span, 6th Crossing of Sacramento River, So. Pac. Co., The Phoenix Bridge Co., C.O. 836D, Drawing No. 12, Scale - 1' = 1', Engineer - B.M. Krohn, May 22nd `01, J.C.S.' - Southern Pacific Railroad Shasta Route, Bridge No. 301.85, Milepost 301.85, Pollard Flat, Shasta County, CA

  14. 48 CFR 17.200 - Scope of subpart.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... involving the construction, alteration, or repair (including dredging, excavating, and painting) of buildings, bridges, roads, or other kinds of real property; (b) Architect-engineer services; and (c...

  15. 48 CFR 17.200 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... involving the construction, alteration, or repair (including dredging, excavating, and painting) of buildings, bridges, roads, or other kinds of real property; (b) Architect-engineer services; and (c...

  16. 48 CFR 17.200 - Scope of subpart.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... involving the construction, alteration, or repair (including dredging, excavating, and painting) of buildings, bridges, roads, or other kinds of real property; (b) Architect-engineer services; and (c...

  17. 48 CFR 17.200 - Scope of subpart.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... involving the construction, alteration, or repair (including dredging, excavating, and painting) of buildings, bridges, roads, or other kinds of real property; (b) Architect-engineer services; and (c...

  18. 48 CFR 17.200 - Scope of subpart.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... involving the construction, alteration, or repair (including dredging, excavating, and painting) of buildings, bridges, roads, or other kinds of real property; (b) Architect-engineer services; and (c...

  19. Damage detection in bridges through fiber optic structural health monitoring

    NASA Astrophysics Data System (ADS)

    Doornink, J. D.; Phares, B. M.; Wipf, T. J.; Wood, D. L.

    2006-10-01

    A fiber optic structural health monitoring (SHM) system was developed and deployed by the Iowa State University (ISU) Bridge Engineering Center (BEC) to detect gradual or sudden damage in fracture-critical bridges (FCBs). The SHM system is trained with measured performance data, which are collected by fiber optic strain sensors to identify typical bridge behavior when subjected to ambient traffic loads. Structural responses deviating from the trained behavior are considered to be signs of structural damage or degradation and are identified through analytical procedures similar to control chart analyses used in statistical process control (SPC). The demonstration FCB SHM system was installed on the US Highway 30 bridge near Ames, IA, and utilizes 40 fiber bragg grating (FBG) sensors to continuously monitor the bridge response when subjected to ambient traffic loads. After the data is collected and processed, weekly evaluation reports are developed that summarize the continuous monitoring results. Through use of the evaluation reports, the bridge owner is able to identify and estimate the location and severity of the damage. The information presented herein includes an overview of the SHM components, results from laboratory and field validation testing on the system components, and samples of the reduced and analyzed data.

  20. Damage identification in highway bridges using distribution factors

    NASA Astrophysics Data System (ADS)

    Gangone, Michael V.; Whelan, Matthew J.

    2017-04-01

    The U.S. infrastructure system is well behind the needs of the 21st century and in dire need of improvements. The American Society of Civil Engineers (ASCE) graded America's Infrastructure as a "D+" in its recent 2013 Report Card. Bridges are a major component of the infrastructure system and were awarded a "C+". Nearly 25 percent of the nation's bridges are categorized as deficient by the Federal Highway Administration (FWHA). Most bridges were designed with an expected service life of roughly 50 years and today the average age of a bridge is 42 years. Finding alternative methods of condition assessment which captures the true performance of the bridge is of high importance. This paper discusses the monitoring of two multi-girder/stringer bridges at different ages of service life. Normal strain measurements were used to calculate the load distribution factor at the midspan of the bridge under controlled loading conditions. Controlled progressive damage was implemented to one of the superstructures to determine if the damage could be detected using the distribution factor. An uncertainty analysis, based on the accuracy and precision of the normal strain measurement, was undertaken to determine how effective it is to use the distribution factor measurement as a damage indicator. The analysis indicates that this load testing parameter may be an effective measure for detecting damage.

  1. Rational molecular engineering of cyclopentadithiophene-bridged D-A-π-A sensitizers combining high photovoltaic efficiency with rapid dye adsorption

    PubMed Central

    Chai, Qipeng; Li, Wenqin; Liu, Jingchuan; Geng, Zhiyuan; Tian, He; Zhu, Wei-hong

    2015-01-01

    Dye-sensitized solar cell (DSSC) is considered as a feasible route to the clean and renewable energy conversion technique. The commercial application requires further enhancements on photovoltaic efficiency and simplification on the device fabrication. For avoiding the unpreferable trade-off between photocurrent (JSC) and photovoltage (VOC), here we report the molecular engineering and comprehensive photovoltaic characterization of three cyclopentadithiophene-bridged D-A-π-A motif sensitizers with a change in donor group. We make a careful choice on the donor and conjugation bridge for synergistically increasing JSC and VOC. Comparing with the reference dye WS-2, the photovoltaic efficiency with the single component dye of WS-51 increases by 18%, among one of the rare examples in pure metal-free organic dyes exceeding 10% in combination with traditional iodine redox couples. Moreover, WS-51 exhibits several prominent merits on potentially scale-up industrial application: i) facile synthetic route to target molecule, ii) simple dipping procedure without requirement of co-sensitization, and iii) rapid dye adsorption capability. PMID:26066974

  2. Fatigue assessment of an existing steel bridge by finite element modelling and field measurements

    NASA Astrophysics Data System (ADS)

    Kwad, J.; Alencar, G.; Correia, J.; Jesus, A.; Calçada, R.; Kripakaran, P.

    2017-05-01

    The evaluation of fatigue life of structural details in metallic bridges is a major challenge for bridge engineers. A reliable and cost-effective approach is essential to ensure appropriate maintenance and management of these structures. Typically, local stresses predicted by a finite element model of the bridge are employed to assess the fatigue life of fatigue-prone details. This paper illustrates an approach for fatigue assessment based on measured data for a connection in an old bascule steel bridge located in Exeter (UK). A finite element model is first developed from the design information. The finite element model of the bridge is calibrated using measured responses from an ambient vibration test. The stress time histories are calculated through dynamic analysis of the updated finite element model. Stress cycles are computed through the rainflow counting algorithm, and the fatigue prone details are evaluated using the standard SN curves approach and the Miner’s rule. Results show that the proposed approach can estimate the fatigue damage of a fatigue prone detail in a structure using measured strain data.

  3. Mitigating the Mathematical Knowledge Gap between High School and First Year University Chemical Engineering Mathematics Course

    ERIC Educational Resources Information Center

    Basitere, Moses; Ivala, Eunice

    2015-01-01

    This paper reports on a study carried out at a University of Technology, South Africa, aimed at identifying the existence of the mathematical knowledge gap and evaluating the intervention designed to bridge the knowledge gap amongst students studying first year mathematics at the Chemical Engineering Extended Curriculum Program (ECP). In this…

  4. A Proposition to Engineer a Bridge: Reconnecting with the Industry-Based Educators

    ERIC Educational Resources Information Center

    Rigler, Kenny

    2017-01-01

    The first steps in the engineering design process are to identify and define the problem (Eide, Jenison, Mashaw, & Northup, 2001). The primary purpose of this article is to highlight the problem that has existed for the past three decades (a disconnect between industrial educators and proponents of technological literacy) and to make a…

  5. Bridging the Design-Science Gap with Tools: Science Learning and Design Behaviors in a Simulated Environment for Engineering Design

    ERIC Educational Resources Information Center

    Chao, Jie; Xie, Charles; Nourian, Saeid; Chen, Guanhua; Bailey, Siobhan; Goldstein, Molly H.; Purzer, Senay; Adams, Robin S.; Tutwiler, M. Shane

    2017-01-01

    Many pedagogical innovations aim to integrate engineering design and science learning. However, students frequently show little attempt or have difficulties in connecting their design projects with the underlying science. Drawing upon the Cultural-Historical Activity Theory, we argue that the design tools available in a learning environment…

  6. Reflecting on Classroom Practice: Spatial Reasoning and Simple Coding

    ERIC Educational Resources Information Center

    King, Alessandra

    2015-01-01

    Spatial reasoning--the ability to visualise and play with shapes in one's mind--is essential in many fields, and crucial in any Science, Technology, Engineering, Mathematics [STEM] discipline. It is, for example, the ability that the engineer needs to build bridges; the chemist to see the three-dimensional structure of a molecule; the architect to…

  7. Small-strain measurement in bridge connections using the digital image correlation (DIC) technique

    NASA Astrophysics Data System (ADS)

    Desai, Niranjan

    2016-04-01

    Structural health monitoring (SHM) is emerging as a vital tool to help civil engineers improve the safety, maintainability, and reliability of critical structures and assists infrastructure owners with timely information for the continued safe and economic operation of their structure. SHM involves implementing a strategy that identifies and characterizes damage or undesirable performance in engineering structures. The goal of this research project was to determine the smallest strains measurable using standard digital image correlation (DIC) based SHM equipment. This practical investigation that had strong ties to the industry was motivated by damage observed in a real-world bridge, which was initially undetected. Its early detection would have led to reduced repair costs. To accomplish the aforementioned goal, tests were performed on a laboratory specimen that replicated a steel beam-to-column connection of the concerned bridge, involving progressively loading it in a manner in which it was loaded in the actual bridge, while simultaneously measuring the strains that developed in it using the aforementioned DIC-based equipment and software. Under the controlled conditions in the laboratory, the minimum resolution of the state-of-the-art system used in this investigation was determined. Due to the challenges faced in making these small-strain measurements even under highly controlled laboratory conditions, it was concluded that it is currently unrealistic to use the existing DIC technology in a real-world situation to measure strains as small as those that would need to be measured to detect the onset of damage in bridge connections. More work needs to be done in this area.

  8. Summary and Comparison of Multiphase Streambed Scour Analysis at Selected Bridge Sites in Alaska

    USGS Publications Warehouse

    Conaway, Jeffrey S.

    2004-01-01

    The U.S. Geological Survey and the Alaska Department of Transportation and Public Facilities undertook a cooperative multiphase study of streambed scour at selected bridges in Alaska beginning in 1994. Of the 325 bridges analyzed for susceptibility to scour in the preliminary phase, 54 bridges were selected for a more intensive analysis that included site investigations. Cross-section geometry and hydraulic properties for each site in this study were determined from field surveys and bridge plans. Water-surface profiles were calculated for the 100- and 500-year floods using the Hydrologic Engineering Center?s River Analysis System and scour depths were calculated using methods recommended by the Federal Highway Administration. Computed contraction-scour depths for the 100- and 500-year recurrence-interval discharges exceeded 5 feet at six bridges, and pier-scour depths exceeded 10 feet at 24 bridges. Complex pier-scour computations were made at 10 locations where the computed contraction-scour depths would expose pier footings. Pressure scour was evaluated at three bridges where the modeled flood water-surface elevations intersected the bridge structure. Site investigation at the 54 scour-critical bridges was used to evaluate the effectiveness of the preliminary scour analysis. Values for channel-flow angle of attack and approach-channel width were estimated from bridge survey plans for the preliminary study and were measured during a site investigation for this study. These two variables account for changes in scour depths between the preliminary analysis and subsequent reanalysis for most sites. Site investigation is needed for best estimates of scour at bridges with survey plans that indicate a channel-flow angle of attack and for locations where survey plans did not include sufficient channel geometry upstream of the bridge.

  9. Real-time seismic monitoring of the integrated cape girardeau bridge array and recorded earthquake response

    USGS Publications Warehouse

    Celebi, M.

    2006-01-01

    This paper introduces the state of the art, real-time and broad-band seismic monitoring network implemented for the 1206 m [3956 ft] long, cable-stayed Bill Emerson Memorial Bridge in Cape Girardeau (MO), a new Mississippi River crossing, approximately 80 km from the epicentral region of the 1811-1812 New Madrid earthquakes. The bridge was designed for a strong earthquake (magnitude 7.5 or greater) during the design life of the bridge. The monitoring network comprises a total of 84 channels of accelerometers deployed on the superstructure, pier foundations and at surface and downhole free-field arrays of the bridge. The paper also presents the high quality response data obtained from the network. Such data is aimed to be used by the owner, researchers and engineers to assess the performance of the bridge, to check design parameters, including the comparison of dynamic characteristics with actual response, and to better design future similar bridges. Preliminary analyses of ambient and low amplitude small earthquake data reveal specific response characteristics of the bridge and the free-field. There is evidence of coherent tower, cable, deck interaction that sometimes results in amplified ambient motions. Motions at the lowest tri-axial downhole accelerometers on both MO and IL sides are practically free from any feedback from the bridge. Motions at the mid-level and surface downhole accelerometers are influenced significantly by feedback due to amplified ambient motions of the bridge. Copyright ASCE 2006.

  10. Bridge scour countermeasure assessments at select bridges in the United States, 2014–16

    USGS Publications Warehouse

    Dudunake, Taylor J.; Huizinga, Richard J.; Fosness, Ryan L.

    2017-05-23

    In 2009, the Federal Highway Administration published Hydraulic Engineering Circular No. 23 (HEC-23) to provide specific design and implementation guidelines for bridge scour and stream instability countermeasures. However, the effectiveness of countermeasures implemented over the past decade following those guidelines has not been evaluated. Therefore, in 2013, the U.S. Geological Survey, in cooperation with the Federal Highway Administration, began a study to assess the current condition of bridge-scour countermeasures at selected sites to evaluate their effectiveness. Bridge-scour countermeasures were assessed during 2014-2016. Site assessments included reviewing countermeasure design plans, summarizing the peak and daily streamflow history, and assessments at each site. Each site survey included a photo log summary, field form, and topographic and bathymetric geospatial data and metadata. This report documents the study area and site-selection criteria, explains the survey methods used to evaluate the condition of countermeasures, and presents the complete documentation for each countermeasure assessment.

  11. Criteria for assessment of bridge aesthetic and visual quality

    NASA Astrophysics Data System (ADS)

    Rozentale, I.; Paeglitis, A.

    2017-10-01

    The bridge designers should find an ideal balance between structure, economy, buildability, aesthetics, durability and harmony with industrial or natural landscape. During the last years, the society has adopted documents providing procedures for evaluation of the impact of the structural appearance on surrounding landscape. The European Landscape Convention defines the landscape as an area perceived by people, whose character is the result of the action and interaction of natural and/or human factors. The Convention indicates the methods for clear and objective assessment of the landscape’s visual qualities. The esthetical qualities of bridge structures, appearance and attraction should satisfy not only the technicians - engineers and architects, but mostly the surrounding population. Each of these groups has a different perception of esthetical qualities of structure. Many authors have used different methods and criteria for assessment of bridge aesthetics. The aim of this paper is to provide an overview of the bridge aesthetic and visual quality assessment methods and criteria.

  12. ITOS to EDGE "Bridge" Software for Morpheus Lunar/Martian Vehicle

    NASA Technical Reports Server (NTRS)

    Hirsh, Robert; Fuchs, Jordan

    2012-01-01

    My project Involved Improving upon existing software and writing new software for the Project Morpheus Team. Specifically, I created and updated Integrated Test and Operations Systems (ITOS) user Interfaces for on-board Interaction with the vehicle during archive playback as well as live streaming data. These Interfaces are an integral part of the testing and operations for the Morpheus vehicle providing any and all information from the vehicle to evaluate instruments and insure coherence and control of the vehicle during Morpheus missions. I also created a "bridge" program for Interfacing "live" telemetry data with the Engineering DOUG Graphics Engine (EDGE) software for a graphical (standalone or VR dome) view of live Morpheus nights or archive replays, providing graphical representation of vehicle night and movement during subsequent tests and in real missions.

  13. Salt-Bridge Energetics in Halophilic Proteins

    PubMed Central

    Nayek, Arnab; Sen Gupta, Parth Sarthi; Banerjee, Shyamashree; Mondal, Buddhadev; Bandyopadhyay, Amal K.

    2014-01-01

    Halophilic proteins have greater abundance of acidic over basic and very low bulky hydrophobic residues. Classical electrostatic stabilization was suggested as the key determinant for halophilic adaptation of protein. However, contribution of specific electrostatic interactions (i.e. salt-bridges) to overall stability of halophilic proteins is yet to be understood. To understand this, we use Adaptive-Poison-Boltzmann-Solver Methods along with our home-built automation to workout net as well as associated component energy terms such as desolvation energy, bridge energy and background energy for 275 salt-bridges from 20 extremely halophilic proteins. We then perform extensive statistical analysis on general and energetic attributes on these salt-bridges. On average, 8 salt-bridges per 150 residues protein were observed which is almost twice than earlier report. Overall contributions of salt-bridges are −3.0 kcal mol−1. Majority (78%) of salt-bridges in our dataset are stable and conserved in nature. Although, average contributions of component energy terms are equal, their individual details vary greatly from one another indicating their sensitivity to local micro-environment. Notably, 35% of salt-bridges in our database are buried and stable. Greater desolvation penalty of these buried salt-bridges are counteracted by stable network salt-bridges apart from favorable equal contributions of bridge and background terms. Recruitment of extensive network salt-bridges (46%) with a net contribution of −5.0 kcal mol−1 per salt-bridge, seems to be a halophilic design wherein favorable average contribution of background term (−10 kcal mol−1) exceeds than that of bridge term (−7 kcal mol−1). Interiors of proteins from halophiles are seen to possess relatively higher abundance of charge and polar side chains than that of mesophiles which seems to be satisfied by cooperative network salt-bridges. Overall, our theoretical analyses provide insight into halophilic signature in its specific electrostatic interactions which we hope would help in protein engineering and bioinformatics studies. PMID:24743799

  14. Salt-bridge energetics in halophilic proteins.

    PubMed

    Nayek, Arnab; Sen Gupta, Parth Sarthi; Banerjee, Shyamashree; Mondal, Buddhadev; Bandyopadhyay, Amal K

    2014-01-01

    Halophilic proteins have greater abundance of acidic over basic and very low bulky hydrophobic residues. Classical electrostatic stabilization was suggested as the key determinant for halophilic adaptation of protein. However, contribution of specific electrostatic interactions (i.e. salt-bridges) to overall stability of halophilic proteins is yet to be understood. To understand this, we use Adaptive-Poison-Boltzmann-Solver Methods along with our home-built automation to workout net as well as associated component energy terms such as desolvation energy, bridge energy and background energy for 275 salt-bridges from 20 extremely halophilic proteins. We then perform extensive statistical analysis on general and energetic attributes on these salt-bridges. On average, 8 salt-bridges per 150 residues protein were observed which is almost twice than earlier report. Overall contributions of salt-bridges are -3.0 kcal mol-1. Majority (78%) of salt-bridges in our dataset are stable and conserved in nature. Although, average contributions of component energy terms are equal, their individual details vary greatly from one another indicating their sensitivity to local micro-environment. Notably, 35% of salt-bridges in our database are buried and stable. Greater desolvation penalty of these buried salt-bridges are counteracted by stable network salt-bridges apart from favorable equal contributions of bridge and background terms. Recruitment of extensive network salt-bridges (46%) with a net contribution of -5.0 kcal mol-1 per salt-bridge, seems to be a halophilic design wherein favorable average contribution of background term (-10 kcal mol-1) exceeds than that of bridge term (-7 kcal mol-1). Interiors of proteins from halophiles are seen to possess relatively higher abundance of charge and polar side chains than that of mesophiles which seems to be satisfied by cooperative network salt-bridges. Overall, our theoretical analyses provide insight into halophilic signature in its specific electrostatic interactions which we hope would help in protein engineering and bioinformatics studies.

  15. 11. 'Erection Plan, 1 208'101/2' C. to C. End ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. 'Erection Plan, 1 - 208'-10-1/2' C. to C. End Pins S. Tr. Thro. Skew Span, 6th Crossing Sacramento River, Pacific System, Southern Pacific Company, The Phoenix Bridge Co., C.O. 836D, Drawing No. 13, Scale 1/8' = 1'0', Engineer, B.M. Krohn, Draftsman, W.L. Clegg, Date, May 25th 1901' - Southern Pacific Railroad Shasta Route, Bridge No. 301.85, Milepost 301.85, Pollard Flat, Shasta County, CA

  16. Single Phase Passive Rectification Versus Active Rectification Applied to High Power Stirling Engines

    NASA Technical Reports Server (NTRS)

    Santiago, Walter; Birchenough, Arthur G.

    2006-01-01

    Stirling engine converters are being considered as potential candidates for high power energy conversion systems required by future NASA explorations missions. These types of engines typically contain two major moving parts, the displacer and the piston, in which a linear alternator is attached to the piston to produce a single phase sinusoidal waveform at a specific electric frequency. Since all Stirling engines perform at low electrical frequencies (less or equal to 100 Hz), space explorations missions that will employ these engines will be required to use DC power management and distribution (PMAD) system instead of an AC PMAD system to save on space and weight. Therefore, to supply such DC power an AC to DC converter is connected to the Stirling engine. There are two types of AC to DC converters that can be employed, a passive full bridge diode rectifier and an active switching full bridge rectifier. Due to the inherent line inductance of the Stirling Engine-Linear Alternator (SE-LA), their sinusoidal voltage and current will be phase shifted producing a power factor below 1. In order to keep power the factor close to unity, both AC to DC converters topologies will implement power factor correction. This paper discusses these power factor correction methods as well as their impact on overall mass for exploration applications. Simulation results on both AC to DC converters topologies with power factor correction as a function of output power and SE-LA line inductance impedance are presented and compared.

  17. Computational and experimental investigation of free vibration and flutter of bridge decks

    NASA Astrophysics Data System (ADS)

    Helgedagsrud, Tore A.; Bazilevs, Yuri; Mathisen, Kjell M.; Øiseth, Ole A.

    2018-06-01

    A modified rigid-object formulation is developed, and employed as part of the fluid-object interaction modeling framework from Akkerman et al. (J Appl Mech 79(1):010905, 2012. https://doi.org/10.1115/1.4005072) to simulate free vibration and flutter of long-span bridges subjected to strong winds. To validate the numerical methodology, companion wind tunnel experiments have been conducted. The results show that the computational framework captures very precisely the aeroelastic behavior in terms of aerodynamic stiffness, damping and flutter characteristics. Considering its relative simplicity and accuracy, we conclude from our study that the proposed free-vibration simulation technique is a valuable tool in engineering design of long-span bridges.

  18. Verification of nonlinear dynamic structural test results by combined image processing and acoustic analysis

    NASA Astrophysics Data System (ADS)

    Tene, Yair; Tene, Noam; Tene, G.

    1993-08-01

    An interactive data fusion methodology of video, audio, and nonlinear structural dynamic analysis for potential application in forensic engineering is presented. The methodology was developed and successfully demonstrated in the analysis of heavy transportable bridge collapse during preparation for testing. Multiple bridge elements failures were identified after the collapse, including fracture, cracks and rupture of high performance structural materials. Videotape recording by hand held camcorder was the only source of information about the collapse sequence. The interactive data fusion methodology resulted in extracting relevant information form the videotape and from dynamic nonlinear structural analysis, leading to full account of the sequence of events during the bridge collapse.

  19. Environment Impact Analysis of Shield Passing Alongside Bridge Pile Platform Using Three Dimensional Numerical Simulation

    NASA Astrophysics Data System (ADS)

    Shang, Yanliang; Shi, Wenjun; Han, Tongyin; Qin, Zhichao; Du, Shouji

    2017-10-01

    The shield method has many advantages in the construction of urban subway, and has become the preferred method for the construction of urban subway tunnel. Taking Shijiazhuang metro line 3 (administrative center station - garden park station interval) Passing alongside bridge as the engineering background, double shield crossing the bridge pile foundation model was set up. The deformation and internal force of the pile foundation during the construction of the shield were analyzed. Pile stress caused by shield construction increases, but the maximum stress is less than the design strength; the maximum surface settlement caused by the construction of 10.2 mm, the results meet the requirements of construction.

  20. Laboratory and Field Investigations of Small Crater Repair Technologies

    DTIC Science & Technology

    2007-09-01

    caps over debris backfill or specially placed or compacted backfill, structural systems to bridge craters, foamed crater backfills, and structural ...Jeb S. Tingle, and Timothy J. McCaffrey Geotechnical and Structures Laboratory U.S. Army Engineer Research and Development Center 3909 Halls Ferry...Engineer Research and Development Center (ERDC), Geotechnical and Structures Laboratory (GSL), Vicksburg, MS. The findings and recommendations presented

  1. Issues related to durability and protection affecting the acceptance and use of engineered wood composites in Europe

    Treesearch

    Mark Hughes; Jerrold E. Winandy

    2007-01-01

    Engineered wood composites (EWC) offer significant potential in applications in the built environment, ranging from domestic dwellings to bridges and public buildings. Nevertheless, EWCs, which include products such as glulam, laminated veneer lumber, oriented stand-board, and plywood enjoy a relatively small market share of total wood-based material production and...

  2. 25. Photocopied from Photo 1103, Olmstead Folder #2, Engineering Department, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Photocopied from Photo 1103, Olmstead Folder #2, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. GENERAL VIEW OF SITE, c.1920? (PHOTO SHOWS DENVER & RIO GRANDE WESTERN RR BRIDGE, MOVED TO SITE IN 1919.) - Telluride Power Company, Olmsted Hydroelectric Plant, mouth of Provo River Canyon West of U.S. Route 189, Orem, Utah County, UT

  3. Covered bridge manual

    DOT National Transportation Integrated Search

    2005-04-01

    This manual provides guidance to those involved with all aspects of the work, from initial inspection and evaluation, through the engineering of rehabilitation, to construction issues. Broadly speaking, this manual covers general terminology and hist...

  4. In-plane free vibration analysis of cable arch structure

    NASA Astrophysics Data System (ADS)

    Zhao, Yueyu; Kang, Houjun

    2008-05-01

    Cable-stayed arch bridge is a new type of composite bridge, which utilizes the mechanical characters of cable and arch. Based on the supporting members of cable-stayed arch bridge and of erection of arch bridge using of the cantilever construction method with tiebacks, we propose a novel mechanical model of cable-arch structure. In this model, the equations governing vibrations of the cable-arch are derived according to Hamilton's principle for dynamic problems in elastic body under equilibrium state. Then, the program of solving the dynamic governing equations is ultimately established by the transfer matrix method for free vibration of uniform and variable cross-section, and the internal characteristics of the cable-arch are investigated. After analyzing step by step, the research results approve that the program is accurate; meanwhile, the mechanical model and method are both valuable and significant not only in theoretical research and calculation but also in design of engineering.

  5. Comparison of Observed and Predicted Abutment Scour at Selected Bridges in Maine

    USGS Publications Warehouse

    Lombard, Pamela J.; Hodgkins, Glenn A.

    2008-01-01

    Maximum abutment-scour depths predicted with five different methods were compared to maximum abutment-scour depths observed at 100 abutments at 50 bridge sites in Maine with a median bridge age of 66 years. Prediction methods included the Froehlich/Hire method, the Sturm method, and the Maryland method published in Federal Highway Administration Hydraulic Engineering Circular 18 (HEC-18); the Melville method; and envelope curves. No correlation was found between scour calculated using any of the prediction methods and observed scour. Abutment scour observed in the field ranged from 0 to 6.8 feet, with an average observed scour of less than 1.0 foot. Fifteen of the 50 bridge sites had no observable scour. Equations frequently overpredicted scour by an order of magnitude and in some cases by two orders of magnitude. The equations also underpredicted scour 4 to 14 percent of the time.

  6. Photographic copy of computer enhanced color photographic image. Photographer and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of computer enhanced color photographic image. Photographer and computer draftsman unknown. Original photographic image located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA 70130. COMPUTER ENHANCED COLOR PHOTOGRAPH SHOWING THE PROPOSED HUEY P. LONG BRIDGE WIDENING LOOKING FROM THE WEST BANK TOWARD THE EAST BANK. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  7. Center Director Bridges and Lt. Gov. Brogan sign Memorandum of Understanding

    NASA Technical Reports Server (NTRS)

    2000-01-01

    At the KSC Visitor Complex, Center Director Roy D. Bridges (left) and Florida's Lieutenant Governor Frank T. Brogan sign a Memorandum of Understanding (MOU). The MOU documents the intent of NASA KSC and the State of Florida to form partnerships with academic institutions in Florida for development of aerospace- related advanced training and academic/educational programs. The three-year project anticipates that the partnership and educational programs fostered will improve the lifelong learning environment for the aerospace and engineering workforce.

  8. 20. 'Portals and Gusset Plates for 3 180'61/2' c. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. 'Portals and Gusset Plates for 3 - 180'-6-1/2' c. to c. End Pins Single Track Through Spans, 10th, 11th, & 13th Crossings of Sacramento River, Southern Pacific Co. Sacramento Division, The Phoenix Bridge Co., C.O's. 839, 840 & 841, Drawing #12, Engineer C. Scheidl, Draftsman B. Heald, Scale 1-1/2' = 1'0', April 16th, 1901.' - Southern Pacific Railroad Shasta Route, Bridge No. 310.58, Milepost 310.58, Sims, Shasta County, CA

  9. Dune management challenges on developed coasts

    USGS Publications Warehouse

    Elko, Nicole A.; Brodie, Kate; Stockdon, Hilary F.; Nordstrom, Karl F.; Houser, Chris; McKenna, Kim; Moore, Laura; Rosati, Julie D.; Ruggiero, Peter; Thuman, Roberta; Walker, Ian J.

    2015-01-01

    From October 26-28, 2015, nearly 100 members of the coastal management and research communities met in Kitty Hawk, NC, USA to bridge the apparent gap between the coastal dune research of scientists and engineers and the needs of coastal management practitioners. The workshop aimed to identify the challenges involved in building and managing dunes on developed coasts, assess the extent to which scientific knowledge can be applied to the management community, and identify approaches to provide means to bridge the gap between needs and potential solutions.

  10. AI Tools Bridge Technology Gap.

    ERIC Educational Resources Information Center

    Rauch-Hindin, Wendy

    1985-01-01

    This second part of a report on artificial intelligence focuses on the development of expert systems in a variety of applications, from engineering to science, and details expectations for implementation of these systems. (JN)

  11. Computational mechanics research and support for aerodynamics and hydraulics at TFHRC year 1 quarter 4 progress report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lottes, S.A.; Kulak, R.F.; Bojanowski, C.

    2011-12-09

    The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. Themore » analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water effects on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to assess them for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, CFD analysis of the operation of the wind tunnel in the TFCHR wind engineering laboratory, vehicle stability under high wind loading, and the use of electromagnetic shock absorbers to improve vehicle stability under high wind conditions. This quarterly report documents technical progress on the project tasks for the period of July through September 2011.« less

  12. Health Monitoring and Evaluation of Long-Span Bridges Based on Sensing and Data Analysis: A Survey

    PubMed Central

    Zhou, Jianting; Li, Xiaogang; Xia, Runchuan; Yang, Jun; Zhang, Hong

    2017-01-01

    Aimed at the health monitoring and evaluation of bridges based on sensing technology, the monitoring contents of different structural types of long-span bridges were defined. Then, the definition, classification, selection principle, and installation requirements of the sensors were summarized. The concept was proposed that new adaptable long-life sensors could be developed by new theories and new effects. The principle and methods to select controlled sections and optimize the layout design of measuring points were illustrated. The functional requirements were elaborated on about the acquisition, transmission, processing, and management of sensing information. Some advanced concepts about the method of bridge safety evaluation were demonstrated and technology bottlenecks in the current safety evaluation were also put forward. Ultimately, combined with engineering practices, an application was carried out. The results showed that new, intelligent, and reliable sensor technology would be one of the main future development directions in the long-span bridge health monitoring and evaluation field. Also, it was imperative to optimize the design of the health monitoring system and realize its standardization. Moreover, it is a heavy responsibility to explore new thoughts and new concepts regarding practical bridge safety and evaluation technology. PMID:28300785

  13. Enhancing the Thermal Resistance of a Novel Acidobacteria-Derived Phytase by Engineering of Disulfide Bridges.

    PubMed

    Tan, Hao; Miao, Renyun; Liu, Tianhai; Cao, Xuelian; Wu, Xiang; Xie, Liyuan; Huang, Zhongqian; Peng, Weihong; Gan, Bingcheng

    2016-10-28

    A novel phytase of Acidobacteria was identified from a soil metagenome, cloned, overexpressed, and purified. It has low sequence similarity (<44%) to all the known phytases. At the optimum pH (2.5), the phytase shows an activity level of 1,792 μmol/min/mg at physiological temperature (37°C) and could retain 92% residual activity after 30 min, indicating the phytase is acidophilic and acidostable. However the phytase shows poor stability at high temperatures. To improve its thermal resistance, the enzyme was redesigned using Disulfide by Design 2.0, introducing four additional disulfide bridges. The half-life time of the engineered phytase at 60°C and 80°C, respectively, is 3.0× and 2.8× longer than the wild-type, and its activity and acidostability are not significantly affected.

  14. 115. ARAI Details of hot cell section of building ARA626. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    115. ARA-I Details of hot cell section of building ARA-626. Shows location of high density concrete, viewing windows, filters, monorail crane, bridge crane, and other details. Norman Engineering Company 961-area/SF-626-MS-1. Date: January 1959. Ineel index code no. 068-0626-40-613-102737. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  15. Bridging the Gap between Engineering Design and PK-12 Curriculum Development through the Use of the STEM Education Quality Framework

    ERIC Educational Resources Information Center

    Pinnell, Margaret; Rowly, James; Preiss, Sandi; Franco, Suzanne; Blust, Rebecca; Beach, Renee

    2013-01-01

    This paper will describe a unique partnership among the Department of Teacher Education and School of Engineering at the University of Dayton (UD) and the Dayton Regional STEM Center (DRSC). This partnership resulted in the development of the STEM Education Quality Framework (SQF), a tool to guide educators in teaching, learning and refining STEM…

  16. Bridging the Technology Valley of Death in Joint Medical Development

    DTIC Science & Technology

    2015-11-01

    Force lieutenant colonel, is the Air Force Medical Support Agency Advanced Development Liaison Field Engineer in Falls Church, Virginia. Prusaczyk is...Awareness, communication and coordination may be mini - mal among Service S&T and AD programs. Joint Transition Planning Process A Joint Transition...Human Proof of Phase III NDA/BLA ling Approval, Launch Concept*** Launch Review Program Initiation Materiel Technology Engineering & Production

  17. Health monitoring of the Saint-Jean bridge of Bordeaux, France using fiber Bragg grating extensometers

    NASA Astrophysics Data System (ADS)

    Magne, Sylvain; Boussoir, Jonathan; Rougeault, Stephane; Marty-Dewynter, Veronique; Ferdinand, Pierre; Bureau, Lionel

    2003-07-01

    Most civil engineering structures have been built in the 50's and 60's and reach similar level of degradation accelerated by loading conditions and corrosion. In Europe, National Authorities and the European Commission promote Health Monitoring concepts, instrumentation of existing structures and help in the design of new durable structures of higher performance. In this context, the CEA-List has achieved a non-exclusive industrial transfer of its Bragg grating sensing technology for civil engineering applications to Hydrolog (French SME), supported by the European Community and the french ministry of Industry. In order to check the reliability and user-friendliness of this instrumentation, eleven spectrally-multiplexed Bragg grating-based extensometers, four FBG temperature sensors and an acquisition unit have been installed into the Saint-Jean bridge in Bordeaux, France with the help of the Infrastructure Regional Direction (DRE-Aquitaine) and the Bordeaux Authority (Communaute Urbaine de Bordeaux). A standardized loading of the bridge has been performed on October 29, 1001, with the purpose of correlating its mechanical reaction to loading conditions. Moreover, the equipment has been operating for one year to take into account the winter-summer cycle.

  18. Self-healing patterns in ferromagnetic-superconducting hybrids

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vlasko-Vlasov, V. K.; Palacious, E.; Rosenmann, D.

    We study magnetic flux dynamic effects in a superconducting bridge with thin soft magnetic stripes placed either on top or under the bridge. Voltage-current (VI) measurements reveal that the edges of magnetic stripes oriented transvers or along the bridge introduce channels or barriers for vortex motion, resulting in the decrease or increase of the critical current, respectively. We demonstrate a remarkable self-healing effect whereby the magnetic pinning strength for the longitudinal stripes increases with current. The self-field of the current polarizes the magnetic stripes along their width, which enhances the stray fields at their edges and creates a dynamic vortexmore » pinning landscape to impede vortex flow. Our results highlight new strategies to engineer adaptive pinning topologies in superconducting-ferromagnetic hybrids.« less

  19. Porous decellularized tissue engineered hypertrophic cartilage as a scaffold for large bone defect healing.

    PubMed

    Cunniffe, Gráinne M; Vinardell, Tatiana; Murphy, J Mary; Thompson, Emmet M; Matsiko, Amos; O'Brien, Fergal J; Kelly, Daniel J

    2015-09-01

    Clinical translation of tissue engineered therapeutics is hampered by the significant logistical and regulatory challenges associated with such products, prompting increased interest in the use of decellularized extracellular matrix (ECM) to enhance endogenous regeneration. Most bones develop and heal by endochondral ossification, the replacement of a hypertrophic cartilaginous intermediary with bone. The hypothesis of this study is that a porous scaffold derived from decellularized tissue engineered hypertrophic cartilage will retain the necessary signals to instruct host cells to accelerate endogenous bone regeneration. Cartilage tissue (CT) and hypertrophic cartilage tissue (HT) were engineered using human bone marrow derived mesenchymal stem cells, decellularized and the remaining ECM was freeze-dried to generate porous scaffolds. When implanted subcutaneously in nude mice, only the decellularized HT-derived scaffolds were found to induce vascularization and de novo mineral accumulation. Furthermore, when implanted into critically-sized femoral defects, full bridging was observed in half of the defects treated with HT scaffolds, while no evidence of such bridging was found in empty controls. Host cells which had migrated throughout the scaffold were capable of producing new bone tissue, in contrast to fibrous tissue formation within empty controls. These results demonstrate the capacity of decellularized engineered tissues as 'off-the-shelf' implants to promote tissue regeneration. Copyright © 2015 Acta Materialia Inc. Published by Elsevier Ltd. All rights reserved.

  20. Deep Borehole Instrumentation Along San Francisco Bay Bridges - 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hutchings, L.; Kasameyer, P.; Turpin, C.

    2000-03-01

    This is a progress report on the Bay Bridges downhole network. Between 2 and 8 instruments have been spaced along the Dumbarton, San Mateo, Bay, and San Rafael bridges in San Francisco Bay, California. The instruments will provide multiple use data that is important to geotechnical, structural engineering, and seismological studies. The holes are between 100 and 1000 ft deep and were drilled by Caltrans. There are twenty-one sensor packages at fifteen sites. The downhole instrument package contains a three component HS-1 seismometer and three orthogonal Wilcox 731 accelerometers, and is capable of recording a micro g from local Mmore » = 1.0 earthquakes to 0.5 g strong ground motion form large Bay Area earthquakes. Preliminary results on phasing across the Bay Bridge, up and down hole wave amplification at Yerba Buena Island, and sensor orientation analysis are presented. Events recorded and located during 1999 are presented. Also, a senior thesis on the deep structure of the San Francisco Bay beneath the Bay Bridge is presented as an addendum.« less

  1. Development of a numerical model for vehicle-bridge interaction analysis of railway bridges

    NASA Astrophysics Data System (ADS)

    Kim, Hee Ju; Cho, Eun Sang; Ham, Jun Su; Park, Ki Tae; Kim, Tae Heon

    2016-04-01

    In the field of civil engineering, analyzing dynamic response was main concern for a long time. These analysis methods can be divided into moving load analysis method and moving mass analysis method, and formulating each an equation of motion has recently been studied after dividing vehicles and bridges. In this study, the numerical method is presented, which can consider the various train types and can solve the equations of motion for a vehicle-bridge interaction analysis by non-iteration procedure through formulating the coupled equations for motion. Also, 3 dimensional accurate numerical models was developed by KTX-vehicle in order to analyze dynamic response characteristics. The equations of motion for the conventional trains are derived, and the numerical models of the conventional trains are idealized by a set of linear springs and dashpots with 18 degrees of freedom. The bridge models are simplified by the 3 dimensional space frame element which is based on the Euler-Bernoulli theory. The rail irregularities of vertical and lateral directions are generated by PSD functions of the Federal Railroad Administration (FRA).

  2. Engineering policy guidelines for design of spread footings.

    DOT National Transportation Integrated Search

    2011-10-01

    These guidelines were developed as part of a comprehensive research program undertaken by the Missouri Department of Transportation (MoDOT) to reduce costs associated with design and construction of bridge foundations while maintaining appropriate le...

  3. Engineering policy guidelines for design of drilled shafts.

    DOT National Transportation Integrated Search

    2011-10-01

    These guidelines were developed as part of a comprehensive research program undertaken by the Missouri Department of Transportation (MoDOT) to reduce costs associated with design and construction of bridge foundations while maintaining appropriate le...

  4. Engineering policy guidelines for design of driven piles.

    DOT National Transportation Integrated Search

    2011-08-01

    These guidelines were developed as part of a comprehensive research program undertaken by the Missouri Department of : Transportation (MoDOT) to reduce costs associated with design and construction of bridge foundations while maintaining appropriate ...

  5. Engineering policy guidelines for design of earth slopes.

    DOT National Transportation Integrated Search

    2011-10-01

    These guidelines were developed as part of a comprehensive research program undertaken by the Missouri Department of Transportation (MoDOT) to reduce costs associated with design and construction of bridge foundations while maintaining appropriate le...

  6. Engineering policy guidelines for design of earth slopes.

    DOT National Transportation Integrated Search

    2011-08-01

    These guidelines were developed as part of a comprehensive research program undertaken by the Missouri Department of : Transportation (MoDOT) to reduce costs associated with design and construction of bridge foundations while maintaining appropriate ...

  7. Engineering policy guidelines for design of spread footings.

    DOT National Transportation Integrated Search

    2011-08-01

    These guidelines were developed as part of a comprehensive research program undertaken by the Missouri Department of : Transportation (MoDOT) to reduce costs associated with design and construction of bridge foundations while maintaining appropriate ...

  8. Engineering policy guidelines for design of drilled shafts.

    DOT National Transportation Integrated Search

    2011-08-01

    These guidelines were developed as part of a comprehensive research program undertaken by the Missouri Department of : Transportation (MoDOT) to reduce costs associated with design and construction of bridge foundations while maintaining appropriate ...

  9. Flood-inundation maps for the Withlacoochee River From Skipper Bridge Road to St. Augustine Road, within the City of Valdosta, Georgia, and Lowndes County, Georgia

    USGS Publications Warehouse

    Musser, Jonathan W.

    2018-01-31

    Digital flood-inundation maps for a 12.6-mile reach of the Withlacoochee River from Skipper Bridge Road to St. Augustine Road (Georgia State Route 133) were developed to depict estimates of the areal extent and depth of flooding corresponding to selected water levels (stages) at the U.S. Geological Survey (USGS) streamgage at Withlacoochee River at Skipper Bridge Road, near Bemiss, Ga. (023177483). Real-time stage information from this streamgage can be used with these maps to estimate near real-time areas of inundation. The forecasted peak-stage information for the USGS streamgage at Withlacoochee River at Skipper Bridge Road, near Bemiss, Ga. (023177483), can be used in conjunction with the maps developed for this study to show predicted areas of flood inundation.A one-dimensional step-backwater model was developed using the U.S. Army Corps of Engineers Hydrologic Engineer-ing Center’s River Analysis System (HEC–RAS) software for the Withlacoochee River and was used to compute flood profiles for a 12.6-mile reach of the Withlacoochee River. The hydraulic model was then used to simulate 23 water-surface profiles at 1.0-foot (ft) intervals at the Withlacoochee River near the Bemiss streamgage. The profiles ranged from the National Weather Service action stage of 10.7 ft, which is 131.0 ft above the North American Vertical Datum of 1988 (NAVD 88), to a stage of 32.7 ft, which is 153.0 ft above NAVD 88. The simulated water-surface profiles were then combined with a geographic information system digital elevation model—derived from light detection and ranging (lidar) data having a 4.0-ft horizontal resolution—to delineate the area flooded at each 1.0-ft interval of stream stage.

  10. Engineering and introduction of de novo disulphide bridges in organophosphorus hydrolase enzyme for thermostability improvement.

    PubMed

    Farnoosh, Gholamreza; Khajeh, Khosro; Latifi, Ali Mohammad; Aghamollaei, Hossein

    2016-12-01

    The organophosphorus hydrolase (OPH) has been used to degrade organophosphorus chemicals, as one of the most frequently used decontamination methods. Under chemical and thermal denaturing conditions, the enzyme has been shown to unfold. To utilize this enzyme in various applications, the thermal stability is of importance. The engineering of de novo disulphide bridges has been explored as a means to increase the thermal stability of enzymes in the rational method of protein engineering. In this study, Disulphide by Design software, homology modelling and molecular dynamics simulations were used to select appropriate amino acid pairs for the introduction of disulphide bridge to improve protein thermostability. The thermostability of the wild-type and three selected mutant enzymes were evaluated by half-life, delta G inactivation (ΔGi) and structural studies (fluorescence and far-UV CD analysis). Data analysis showed that half-life of A204C/T234C and T128C/E153C mutants were increased up to 4 and 24 min, respectively; however, for the G74C/A78C mutant, the half-life was decreased up to 9 min. For the T128C/E124C mutant, both thermal stability and Catalytic efficiency (kcat) were also increased. The half-life and ΔGi results were correlated to the obtained information from structural studies by circular dichroism (CD) spectrometry and extrinsic fluorescence experiments; as rigidity increased in A204C/T2234C and T128C/E153C mutants, half-life and ΔGi also increased. For G74C/A78C mutant, these parameters decreased due to its higher flexibility. The results were submitted a strong evidence for the possibility to improve the thermostability of OPH enzyme by introducing a disulphide bridge after bioinformatics design, even though this design would not be always successful.

  11. Training needs analysis for engineering technicians in Oman

    NASA Astrophysics Data System (ADS)

    Al-Mughairi, Abdulkarim Sultan

    This thesis examines the transition from the Omani Colleges of Technology (CT) to employment of its engineering graduates. It arises out of concerns that the transition to the labour market for engineering graduate is problematical. The research was carried out to identify the knowledge, skills, and abilities (KSA) of engineering technicians required in the Omani market place. The aim is to provide local curriculum designers in the Colleges of Technology with sufficient information about the required KSA in order to create and enhance the engineering curriculum so that it has greater capacity to meet the needs of a variety of stakeholders and of employers in particular. This in turn has the potential to bridge the gap between what is presently taught and what the workplace demands. Personnel psychologists identify views concerning the skills that are required for different jobs. One of these is based on the assumption that quite different skills are required in different jobs (SCANS, 1990). This view generates approaches within job analysis: the worker-oriented and the task-oriented approaches. This research uses Position Analysis Questionnaire (PAQ), which is a worker-oriented job analysis instrument, to investigate the KSA required to perform some of the engineering technician jobs in Omani industries. In addition, semi-structured interviews were used to investigate the factors that either hinder or entirely prevent the new graduates from Colleges of Technology from being accepted in the workforce pool. The major research findings concern the dimensions of knowledge, skills, and abilities of six engineering technician job titles and the major factors that hinder or (prevent) the technical college graduates from being accepted in the market place in Oman. These findings would definitely help design better transition route and bridge the gap between the CT technicians engineering programmes and the workplace demands.

  12. NDT evaluation of long-term bond durability of CFRP-structural systems applied to RC highway bridges

    NASA Astrophysics Data System (ADS)

    Crawford, Kenneth C.

    2016-06-01

    The long-term durability of CFRP structural systems applied to reinforced-concrete (RC) highway bridges is a function of the system bond behavior over time. The sustained structural load performance of strengthened bridges depends on the carbon fiber-reinforced polymer (CFRP) laminates remaining 100 % bonded to concrete bridge members. Periodic testing of the CFRP-concrete bond condition is necessary to sustain load performance. The objective of this paper is to present a non-destructive testing (NDT) method designed to evaluate the bond condition and long-term durability of CFRP laminate (plate) systems applied to RC highway bridges. Using the impact-echo principle, a mobile mechanical device using light impact hammers moving along the length of a bonded CFRP plate produces unique acoustic frequencies which are a function of existing CFRP plate-concrete bond conditions. The purpose of this method is to test and locate CFRP plates de-bonded from bridge structural members to identify associated deterioration in bridge load performance. Laboratory tests of this NDT device on a CFRP plate bonded to concrete with staged voids (de-laminations) produced different frequencies for bonded and de-bonded areas of the plate. The spectra (bands) of frequencies obtained in these tests show a correlation to the CFRP-concrete bond condition and identify bonded and de-bonded areas of the plate. The results of these tests indicate that this NDT impact machine, with design improvements, can potentially provide bridge engineers a means to rapidly evaluate long lengths of CFRP laminates applied to multiple highway bridges within a national transportation infrastructure.

  13. 27. VIEW NORTHWEST FROM DECKING ON SOUTHEAST CORNER OF PIVOT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. VIEW NORTHWEST FROM DECKING ON SOUTHEAST CORNER OF PIVOT PIER, DRIVE SYSTEM FOR SWING-SPAN INCLUDES: (from left to right) WEDGE DRIVE GEAR BOX, SHAFTS TO WEDGE DRIVE DRIVE, WEDGE DRIVE CRANK SHAFTS, ELECTRIC MOTOR, INTERNATIONAL HARVESTER GASOLINE ENGINE, CONTROL RODS FOR STARTING AND CHOKING ENGINE, PIVOT (bottom center), AND TRACK ON CONCRETE PIER - Tipers Bridge, Spanning Great Wicomico River at State Route 200, Kilmarnock, Lancaster County, VA

  14. ETR CRITICAL FACILITY, TRA654. SCIENTISTS STAND AT EDGE OF TANK ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ETR CRITICAL FACILITY, TRA-654. SCIENTISTS STAND AT EDGE OF TANK AND LIFT REMOVABLE BRIDGE ABOVE THE REACTOR. CONTROL RODS AND FUEL RODS ARE BELOW ENOUGH WATER TO SHIELD WORKERS ABOVE. NOTE CRANE RAILS ALONG WALLS, PUMICE BLOCK WALLS. INL NEGATIVE NO. 57-3690. R.G. Larsen, Photographer, 7/29/1957 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  15. Geosynthetic Reinforced Soil Integrated Bridge System, Synthesis Report

    DOT National Transportation Integrated Search

    2011-01-01

    This report is the second in a two-part series to provide engineers with the necessary background knowledge of Geosynthetic Reinforced Soil (GRS) technology and its fundamental characteristics as an alternative to other construction methods. It suppl...

  16. Use of interactive graphics in bridge analysis and design.

    DOT National Transportation Integrated Search

    1983-01-01

    This study evaluated the role of computer-aided design (CAD), including interactive graphics, in engineering design applications, especially in the design activities of the Virginia Department of Highways and Transportation. A review of the hardware ...

  17. Rock mass classification system : transition from RMR to GSI.

    DOT National Transportation Integrated Search

    2013-11-01

    The AASHTO LRFD Bridge Design Specifications is expected to replace the rock mass rating : (RMR) system with the Geological Strength Index (GSI) system for classifying and estimating : engineering properties of rock masses. This transition is motivat...

  18. 78 FR 65420 - Environmental Impact Statement, Portageville Bridge Project (Wyoming and Livingston Counties, New...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ... economic viability and growth of the Southern Tier and other affected areas of New York. Alternatives under... the project and is considered feasible based on engineering, cost, and social, economic, and...

  19. Minimizing the effects of pile driving vibrations : research spotlight.

    DOT National Transportation Integrated Search

    2013-11-01

    Engineers must take care that the vibrations from pile driving : operations during bridge construction do not damage underground : utilities or cause settlement in the foundations of nearby structures. : In this project, researchers developed a simpl...

  20. Evaluation of pile repair splice design.

    DOT National Transportation Integrated Search

    2015-12-01

    The Oregon Department of Transportation (ODOT) Major Bridge Maintenance Engineer has proposed an in-house pile repair scheme for decayed piles. This repair scheme involves removing decayed area within the pile leaving a 2 outer shell, filling it u...

  1. A Bumpy Road and a Bridge too Far? An Analysis of the Realistic Bridging and Horizontal Construction Capabilities of the Canadian Military Engineers in the Force 2013 Structure

    DTIC Science & Technology

    2012-05-17

    the national security strategy? Liddell Hart describes this difficult challenge faced by all socially conservative states. They must find the type of... challenges and circumstances while working within an economic framework that necessitates choice.”23 TTCP describes the CBP process as a method that involves...a capability gap. Then the Army purchased quick solutions and fielded them for immediate deployment to theatre. Their generation satisfied an urgent

  2. Center Director Bridges and Lt. Gov. Brogan shake hands after signing a Memorandum of Understanding

    NASA Technical Reports Server (NTRS)

    2000-01-01

    At the KSC Visitor Complex, Center Director Roy D. Bridges (left) and Florida's Lieutenant Governor Frank T. Brogan shake hands after signing a Memorandum of Understanding (MOU). The MOU documents the intent of NASA KSC and the State of Florida to form partnerships with academic institutions in Florida for development of aerospace-related advanced training and academic/educational programs. The three-year project anticipates that the partnership and educational programs fostered will improve the lifelong learning environment for the aerospace and engineering workforce.

  3. Health management and controls for earth to orbit propulsion systems

    NASA Technical Reports Server (NTRS)

    Bickford, R. L.

    1992-01-01

    Fault detection and isolation for advanced rocket engine controllers are discussed focusing on advanced sensing systems and software which significantly improve component failure detection for engine safety and health management. Aerojet's Space Transportation Main Engine controller for the National Launch System is the state of the art in fault tolerant engine avionics. Health management systems provide high levels of automated fault coverage and significantly improve vehicle delivered reliability and lower preflight operations costs. Key technologies, including the sensor data validation algorithms and flight capable spectrometers, have been demonstrated in ground applications and are found to be suitable for bridging programs into flight applications.

  4. Smart photonic coating for civil engineering field: for a future inspection technology on concrete bridge

    NASA Astrophysics Data System (ADS)

    Fudouzi, Hiroshi; Tsuchiya, Koichi; Todoroki, Shin-ichi; Hyakutake, Tsuyoshi; Nitta, Hiroyuki; Nishizaki, Itaru; Tanaka, Yoshikazu; Ohya, Takao

    2017-04-01

    Here we will propose the conceptual new idea of the inspection of concrete bridge using smart materials and mobile IoT system. We apply opal photonic crystal film to detect cracks on concrete infrastructures. High quality opal photonic crystal films were coated on black color PET sheet over 1000 cm2 area. The opal film sheet was cut and adhered to concrete or mortar test pieces by epoxy resin. In the tensile test, the structural color of the opal sheet was changed when the crack was formed. As a demonstration, we have installated the opal film sheet on the wall of the concrete bridge. Our final purpose is the color change will be recorded by portable CCD devices, and send to expert via IoT network.

  5. 16. June 1974. BASEMENT, VIEW LOOKING SOUTHWEST, SHOWING THE MAIN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. June 1974. BASEMENT, VIEW LOOKING SOUTHWEST, SHOWING THE MAIN LINE SHAFT COMING THROUGH THE WALL FROM THE OTTO ENGINE. - Gruber Wagon Works, Pennsylvania Route 183 & State Hill Road at Red Bridge Park, Bernville, Berks County, PA

  6. 49 CFR 176.905 - Motor vehicles or mechanical equipment powered by internal combustion engines.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of ignition. A motor vehicle or mechanical equipment showing any signs of leakage or electrical fault... smoke or fire detection system capable of alerting personnel on the bridge. (h) All electrical equipment...

  7. 3. DETAIL VIEW OF DIRECT DRIVE STERLING 'DOLPHIN T' MODEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. DETAIL VIEW OF DIRECT DRIVE STERLING 'DOLPHIN T' MODEL 4 CYLINDER, GASOLINE TRACTOR-TYPE ENGINE WITH FALKBIBBY FLEXIBLE COUPLING - Central Railroad of New Jersey, Newark Bay Lift Bridge, Spanning Newark Bay, Newark, Essex County, NJ

  8. 5. VAL CAMERA CAR, DETAIL OF HOIST AT SIDE OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. VAL CAMERA CAR, DETAIL OF HOIST AT SIDE OF BRIDGE AND ENGINE CAR ON TRACKS, LOOKING NORTHEAST. - Variable Angle Launcher Complex, Camera Car & Track, CA State Highway 39 at Morris Reservior, Azusa, Los Angeles County, CA

  9. Corrosion Monitoring Research of New York City Bridges : TechBrief

    DOT National Transportation Integrated Search

    2013-12-01

    Understanding unsaturated expansive soil has always been a major challenge for soil scientists and engineers. Due to presence of high quantity of montmorillonite mineral in the Moreland clay in northern Louisiana, structural damage due to soil heave/...

  10. Bridging the Gulf between Formal Calculus and Physical Reasoning.

    ERIC Educational Resources Information Center

    Van Der Meer, A.

    1980-01-01

    Some ways to link calculus instruction with the mathematical models used in physics courses are presented. The activity of modelling is presented as a major tool in synchronizing physics and mathematics instruction in undergraduate engineering programs. (MP)

  11. 75 FR 4415 - National Register of Historic Places; Weekly Listing of Historic Properties

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    .../05/09 (Metal Truss, Masonry, and Concrete Bridges in Vermont MPS) WISCONSIN Ozaukee County Port Washington Fire Engine House, 102 E. Pier St., Port Washington, 09000894, LISTED, 11/05/09 [FR Doc. 2010-1601...

  12. Inspection guide for column splice regions affected by premature concrete deterioration.

    DOT National Transportation Integrated Search

    2016-07-01

    This guideline aims to help bridge inspectors and engineers in identifying and assessing the : capability of reinforced concrete column splice regions affected by varying degrees of premature : concrete deterioration due to alkali-silica reaction (AS...

  13. 13. View South, showing the remaining pier footings for the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. View South, showing the remaining pier footings for the steam engine water tower for the Chesapeake and Ohio Railroad. - Cotton Hill Station Bridge, Spanning New River at State Route 16, Cotton Hill, Fayette County, WV

  14. Sustainability of transportation structures using composite materials to support trade and growth.

    DOT National Transportation Integrated Search

    2014-06-01

    Corrosion-induced deterioration of steel rebar is one of the main reasons for repair and rehabilitation programs : for conventional steel-reinforced concrete bridge decks. According to the National Association of Corrosion Engineers : (NACE), of all ...

  15. Finite element modeling and analysis of reinforced-concrete bridge.

    DOT National Transportation Integrated Search

    2000-09-01

    Despite its long history, the finite element method continues to be the predominant strategy employed by engineers to conduct structural analysis. A reliable method is needed for analyzing structures made of reinforced concrete, a complex but common ...

  16. Army Officer Duty Module Manual.

    DTIC Science & Technology

    1975-10-01

    14l 3( RELATIVE CRITICALITY OF THIS Not Least (2) (3) The most PART (MOOULE) TO ENTIRE JOB aplicable critical Average Critical critical a. In actual...3 Directs and controls operations of mobile communications O- support unit -36- I. - O-G-5 Establishes and controls mobile area signal center 0-6-6...ENGINEERING O-EE-1 Directs .and controls combat engineer unit O-EE-2 Directs and controls portable bridging O-EE-3 Directs and controls mobile water

  17. KSC-98pc786

    NASA Image and Video Library

    1998-07-06

    James W. Tibble (pointing at engine), an Engine Systems/Ground Support Equipment team manager for Rocketdyne, discusses the operation of a Space Shuttle Main Engine with Robert B. Sieck, director of Shuttle Processing; U.S. Congressman Dave Weldon; and KSC Center Director Roy D. Bridges Jr. Following the ribbon cutting ceremony for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF), KSC employees and media explored the facility. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998

  18. The SSMEPF opens with a ribbon-cutting ceremony

    NASA Technical Reports Server (NTRS)

    1998-01-01

    James W. Tibble (pointing at engine), an Engine Systems/Ground Support Equipment team manager for Rocketdyne, discusses the operation of a Space Shuttle Main Engine with Robert B. Sieck, director of Shuttle Processing; U.S. Congressman Dave Weldon; and KSC Center Director Roy D. Bridges Jr. Following the ribbon cutting ceremony for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF), KSC employees and media explored the facility. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998.

  19. Environmentally Friendly Solution to Ground Hazards in Design of Bridges in Earthquake Prone Areas Using Timber Piles

    NASA Astrophysics Data System (ADS)

    Sadeghi, H.

    2015-12-01

    Bridges are major elements of infrastructure in all societies. Their safety and continued serviceability guaranties the transportation and emergency access in urban and rural areas. However, these important structures are subject to earthquake induced damages in structure and foundations. The basic approach to the proper support of foundations are a) distribution of imposed loads to foundation in a way they can resist those loads without excessive settlement and failure; b) modification of foundation ground with various available methods; and c) combination of "a" and "b". The engineers has to face the task of designing the foundations meeting all safely and serviceability criteria but sometimes when there are numerous environmental and financial constrains, the use of some traditional methods become inevitable. This paper explains the application of timber piles to improve ground resistance to liquefaction and to secure the abutments of short to medium length bridges in an earthquake/liquefaction prone area in Bohol Island, Philippines. The limitations of using the common ground improvement methods (i.e., injection, dynamic compaction) because of either environmental or financial concerns along with the abundance of timber in the area made the engineers to use a network of timber piles behind the backwalls of the bridge abutments. The suggested timber pile network is simulated by numerical methods and its safety is examined. The results show that the compaction caused by driving of the piles and bearing capacity provided by timbers reduce the settlement and lateral movements due to service and earthquake induced loads.

  20. Tissue engineering of peripheral nerves: Epineurial grafts with application of cultured Schwann cells.

    PubMed

    Fansa, H; Dodic, T; Wolf, G; Schneider, W; Keilhoff, G

    2003-01-01

    After a simple nerve lesion, primary microsurgical suture is the treatment of choice. A nerve gap has to be bridged, with a nerve graft sacrificing a functioning nerve. Alternatively, tissue engineering of nerve grafts has become a subject of experimental research. It is evident that nerve regeneration requires not only an autologous, allogenous, or biodegradable scaffold, but additional interactions with regeneration-promoting Schwann cells. In this study, we compared epineurial and acellularized epineurial tubes with and without application of cultured Schwann cells as alternative grafts in a rat sciatic nerve model. Autologous nerve grafts served as controls. Evaluation was performed after 6 weeks; afterwards, sections of the graft and distal nerve were harvested for histological and morphometrical analysis. Compared to controls, all groups showed a significantly lower number of axons, less well-shaped remyelinizated axons, and a delay in clinical recovery (e.g., toe spread). The presented technique with application of Schwann cells into epineurial tubes did not offer any major advantages for nerve regeneration. Thus, in this applied model, neither the implantation of untreated nor the implantation of acellularized epineurial tubes with cultured Schwann cells to bridge nerve defects was capable of presenting a serious alternative to the present gold standard of conventional nerve grafts for bridging nerve defects in this model. Copyright 2003 Wiley-Liss, Inc.

  1. Integrating ethics in design through the value-sensitive design approach.

    PubMed

    Cummings, Mary L

    2006-10-01

    The Accreditation Board of Engineering and Technology (ABET) has declared that to achieve accredited status, 'engineering programs must demonstrate that their graduates have an understanding of professional and ethical responsibility.' Many engineering professors struggle to integrate this required ethics instruction in technical classes and projects because of the lack of a formalized ethics-in-design approach. However, one methodology developed in human-computer interaction research, the Value-Sensitive Design approach, can serve as an engineering education tool which bridges the gap between design and ethics for many engineering disciplines. The three major components of Value-Sensitive Design, conceptual, technical, and empirical, exemplified through a case study which focuses on the development of a command and control supervisory interface for a military cruise missile.

  2. Strengthening of bridges by post-tensioning using monostrands in substituted cable ducts

    NASA Astrophysics Data System (ADS)

    Klusáček, Ladislav; Svoboda, Adam

    2017-09-01

    Post-tensioning is suitable, reliable and durable method of strengthening existing engineering structures, especially bridges. The high efficiency of post-tensioning can be seen in many applications throughout the world. In this paper the method is extended by a structural system of substituted cable ducts, which allows for significantly widening application of prestressing so it’s convenient mostly for application on beam bridges or slab bridges (built in years 1920 - 1960). The method of substituted cable ducts is based on theoretical knowledge and technical procedures, which were made possible through the development in prestressing systems, particularly the development of prestressing tendons (monostrands) and encased anchorages, as well as progress in drilling technology. This technique is highly recommended due to minimization of interventions into the constructions, unseen method of cable arrangement and hence the absence of impact on appearance, which is appreciated not only in case of valuable historical structures but also in general. It is possible to summarise that posttensioning by monostrands in substituted cable ducts is a highly effective method of strengthening existing bridges in order to increase their load capacities in terms of current traffic load and to extend their service life.

  3. An amateur's contribution to the design of Telford's Menai Suspension Bridge: a commentary on Gilbert (1826) 'On the mathematical theory of suspension bridges'.

    PubMed

    Calladine, C R

    2015-04-13

    Davies Gilbert's work on the catenary is notable on two counts. First, it influenced Thomas Telford in formulating his final design for the Menai Strait suspension bridge (1826); and second, it established for the first time the form of the 'catenary of equal strength'. The classical catenary is a uniform flexible chain or cable hanging freely under gravity between supports. The 'catenary of equal strength' is the form of a cable whose cross-sectional area is made proportional to the tension at each point, so that the tensile stress is uniform throughout. In this paper I provide a sketch of the lives and achievements of Gilbert and Telford, and of their interaction over the Menai Bridge. There follows a commentary on Gilbert's 1826 paper, and on his two related publications; and a brief sketch of the earlier history of the catenary. I then describe the development of the suspension bridge up to the present time. Finally, I discuss relations between mathematical analysts and practical engineers. This commentary was written to celebrate the 350th anniversary of the journal Philosophical Transactions of the Royal Society.

  4. Full-scale measurements and system identification on Sutong cable-stayed bridge during Typhoon Fung-Wong.

    PubMed

    Wang, Hao; Tao, Tianyou; Guo, Tong; Li, Jian; Li, Aiqun

    2014-01-01

    The structural health monitoring system (SHMS) provides an effective tool to conduct full-scale measurements on existing bridges for essential research on bridge wind engineering. In July 2008, Typhoon Fung-Wong lashed China and hit Sutong cable-stayed bridge (SCB) in China. During typhoon period, full-scale measurements were conducted to record the wind data and the structural vibration responses were collected by the SHMS installed on SCB. Based on the statistical method and the spectral analysis technique, the measured data are analyzed to obtain the typical parameters and characteristics. Furthermore, this paper analyzed the measured structural vibration responses and indicated the vibration characteristics of the stay cable and the deck, the relationship between structural vibrations and wind speed, the comparison of upstream and downstream cable vibrations, the effectiveness of cable dampers, and so forth. Considering the significance of damping ratio in vibration mitigation, the modal damping ratios of the SCB are identified based on the Hilbert-Huang transform (HHT) combined with the random decrement technique (RDT). The analysis results can be used to validate the current dynamic characteristic analysis methods, buffeting calculation methods, and wind tunnel test results of the long-span cable-stayed bridges.

  5. Full-Scale Measurements and System Identification on Sutong Cable-Stayed Bridge during Typhoon Fung-Wong

    PubMed Central

    Tao, Tianyou; Li, Aiqun

    2014-01-01

    The structural health monitoring system (SHMS) provides an effective tool to conduct full-scale measurements on existing bridges for essential research on bridge wind engineering. In July 2008, Typhoon Fung-Wong lashed China and hit Sutong cable-stayed bridge (SCB) in China. During typhoon period, full-scale measurements were conducted to record the wind data and the structural vibration responses were collected by the SHMS installed on SCB. Based on the statistical method and the spectral analysis technique, the measured data are analyzed to obtain the typical parameters and characteristics. Furthermore, this paper analyzed the measured structural vibration responses and indicated the vibration characteristics of the stay cable and the deck, the relationship between structural vibrations and wind speed, the comparison of upstream and downstream cable vibrations, the effectiveness of cable dampers, and so forth. Considering the significance of damping ratio in vibration mitigation, the modal damping ratios of the SCB are identified based on the Hilbert-Huang transform (HHT) combined with the random decrement technique (RDT). The analysis results can be used to validate the current dynamic characteristic analysis methods, buffeting calculation methods, and wind tunnel test results of the long-span cable-stayed bridges. PMID:24995367

  6. Engineering nutritious proteins: improvement of stability in the designer protein MB-1 via introduction of disulfide bridges.

    PubMed

    Doucet, Alain; Williams, Martin; Gagnon, Mylene C; Sasseville, Maxime; Beauregard, Marc

    2002-01-02

    Protein design is currently used for the creation of new proteins with desirable traits. In this laboratory the focus has been on the synthesis of proteins with high essential amino acid content having potential applications in animal nutrition. One of the limitations faced in this endeavor is achieving stable proteins despite a highly biased amino acid content. Reported here are the synthesis and characterization of two disulfide-bridged mutants derived from the MB-1 designer protein. Both mutants outperformed their parent protein MB-1 with their bridge formed, as shown by circular dichroism, size exclusion chromatography, thermal denaturation, and proteolytic degradation experiments. When the disulfide bridges were cleaved, the mutants' behavior changed: the mutants significantly unfolded, suggesting that the introduction of Cys residues was deleterious to MB-1-folding. In an attempt to compensate for the mutations used, a Tyr62-Trp mutation was performed, leading to an increase in bulk and hydrophobicity in the core. The Trp-containing disulfide-bridged mutants did not behave as well as the original MB-1Trp, suggesting that position 62 might not be adequate for a compensatory mutation.

  7. The Private Military Industry: Economic Analysis, Uses & Considerations

    DTIC Science & Technology

    2007-03-01

    Intelligence US (cont.) Flour International SAIC Pacific Architects and Engineers Ibis Tek MVM Ibis Tek Samson Int’l Parsons ICI, Oregon New...Vinnell Meyer and Associates Prasons Parsons Worldwide Security MVM Protective Operation Corporate Training Raytheon New Bridge Strategies

  8. Evaluation of corrosion inhibitor : final report.

    DOT National Transportation Integrated Search

    1980-05-01

    Solution to the problem of deterioration of bridge decks due to the corrosion of embedded steel has been sought by engineers for a long time. The purpose of the study was to evaluate, under laboratory conditions, the properties of concrete using a co...

  9. 19. Stress sheet for the river span dated 7/13/12; revised ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Stress sheet for the river span dated 7/13/12; revised Oct. 18 and 21, 1912. Drawing courtesy Office of the Cuyahoga County Engineer, Cleveland, Ohio. - Detroit Superior High Level Bridge, Cleveland, Cuyahoga County, OH

  10. 23 CFR 650.107 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... Applicability. (a) The provisions of this regulation shall apply to all encroachments and to all actions which... immediately following a disaster. (b) The provisions of this regulation shall not apply to or alter approvals...

  11. 23 CFR 650.107 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... Applicability. (a) The provisions of this regulation shall apply to all encroachments and to all actions which... immediately following a disaster. (b) The provisions of this regulation shall not apply to or alter approvals...

  12. 23 CFR 650.107 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... Applicability. (a) The provisions of this regulation shall apply to all encroachments and to all actions which... immediately following a disaster. (b) The provisions of this regulation shall not apply to or alter approvals...

  13. Updating HEC-18 pier scour equations for noncohesive soils.

    DOT National Transportation Integrated Search

    2016-10-01

    A dataset of 594 bridge pier scour observations from two laboratory and three field studies was compiled. The dataset served as the testing ground for evaluating potential enhancements to the pier scour tools for noncohesive soils in Hydraulic Engine...

  14. The effect of load history on reinforced concrete bridge column behavior : [summary].

    DOT National Transportation Integrated Search

    2012-08-01

    To satisfy the aims of performance based design, levels of damage which interrupt the serviceability of the : structure or require more invasive repair techniques must be related to engineering criteria. In this report, the : influence of displacemen...

  15. The effect of load history on reinforced concrete bridge column behavior.

    DOT National Transportation Integrated Search

    2012-08-01

    To satisfy the aims of performance based design, levels of damage which interrupt the serviceability of the : structure or require more invasive repair techniques must be related to engineering criteria. In this report, the : influence of displacemen...

  16. The Need for Integrated Approaches in Metabolic Engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lechner, Anna; Brunk, Elizabeth; Keasling, Jay D.

    This review highlights state-of-the-art procedures for heterologous small-molecule biosynthesis, the associated bottlenecks, and new strategies that have the potential to accelerate future accomplishments in metabolic engineering. We emphasize that a combination of different approaches over multiple time and size scales must b e considered for successful pathway engineering in a heterologous host. We have classified these optimization procedures based on the "system" that is being manipulated: transcriptome, translatome, proteome, or reactome. By bridging multiple disciplines, including molecular biology, biochemistry, biophysics, and computational sciences, we can create an integral framework for the discovery and implementation of novel biosynthetic production routes.

  17. The Need for Integrated Approaches in Metabolic Engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lechner, Anna; Brunk, Elizabeth; Keasling, Jay D.

    Highlights include state-of-the-art procedures for heterologous small-molecule biosynthesis, the associated bottlenecks, and new strategies that have the potential to accelerate future accomplishments in metabolic engineering. A combination of different approaches over multiple time and size scales must be considered for successful pathway engineering in a heterologous host. We have classified these optimization procedures based on the “system” that is being manipulated: transcriptome, translatome, proteome, or reactome. Here, by bridging multiple disciplines, including molecular biology, biochemistry, biophysics, and computational sciences, we can create an integral framework for the discovery and implementation of novel biosynthetic production routes.

  18. The Need for Integrated Approaches in Metabolic Engineering

    DOE PAGES

    Lechner, Anna; Brunk, Elizabeth; Keasling, Jay D.

    2016-08-15

    Highlights include state-of-the-art procedures for heterologous small-molecule biosynthesis, the associated bottlenecks, and new strategies that have the potential to accelerate future accomplishments in metabolic engineering. A combination of different approaches over multiple time and size scales must be considered for successful pathway engineering in a heterologous host. We have classified these optimization procedures based on the “system” that is being manipulated: transcriptome, translatome, proteome, or reactome. Here, by bridging multiple disciplines, including molecular biology, biochemistry, biophysics, and computational sciences, we can create an integral framework for the discovery and implementation of novel biosynthetic production routes.

  19. Automation based on knowledge modeling theory and its applications in engine diagnostic systems using Space Shuttle Main Engine vibrational data. M.S. Thesis

    NASA Technical Reports Server (NTRS)

    Kim, Jonnathan H.

    1995-01-01

    Humans can perform many complicated tasks without explicit rules. This inherent and advantageous capability becomes a hurdle when a task is to be automated. Modern computers and numerical calculations require explicit rules and discrete numerical values. In order to bridge the gap between human knowledge and automating tools, a knowledge model is proposed. Knowledge modeling techniques are discussed and utilized to automate a labor and time intensive task of detecting anomalous bearing wear patterns in the Space Shuttle Main Engine (SSME) High Pressure Oxygen Turbopump (HPOTP).

  20. KSC-00pp0505

    NASA Image and Video Library

    2000-04-14

    A shower of frozen plastic signifies the successful breaking of the ceremonial "ribbon" at the opening of the new Cryogenic Testbed Facility. Part of the normal ribbon was replaced with plastic tubing and frozen in liquid nitrogen for the event. Bridges hit the tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor

Top