49 CFR 237.33 - Content of bridge management programs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this part...
49 CFR 237.33 - Content of bridge management programs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this part...
49 CFR 237.31 - Adoption of bridge management programs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program to...
49 CFR 237.31 - Adoption of bridge management programs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program to...
23 CFR 973.210 - Indian lands bridge management system (BMS).
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Indian lands bridge management system (BMS). 973.210... PROGRAM Bureau of Indian Affairs Management Systems § 973.210 Indian lands bridge management system (BMS...: (a) The BIA shall have a nationwide BMS for the federally and tribally owned IRR bridges that are...
Bridge deterioration models to support Indiana's bridge management system.
DOT National Transportation Integrated Search
2016-02-01
An effective bridge management system that is equipped with reliable deterioration models enables agency engineers to carry out : monitoring and long-term programming of bridge repair actions. At the project level, deterioration models help the agenc...
23 CFR 973.210 - Indian lands bridge management system (BMS).
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Indian lands bridge management system (BMS). 973.210... HIGHWAYS MANAGEMENT SYSTEMS PERTAINING TO THE BUREAU OF INDIAN AFFAIRS AND THE INDIAN RESERVATION ROADS PROGRAM Bureau of Indian Affairs Management Systems § 973.210 Indian lands bridge management system (BMS...
NHDOT : process for municipally-managed state bridge aid program projects
DOT National Transportation Integrated Search
2007-09-12
The document sets for the requirements for a municipality which to manage the design and construction of a bridge rehabilitation or replacement project and receive Bridge Aid under the applicable provisions of RSA 234. Bridge Aid provided to a Munici...
McKenna, Suzanne; Jones, Fiona; Glenfield, Pauline; Lennon, Sheila
2015-07-01
Enabling self-management behaviors is considered important in order to develop coping strategies and confidence for managing life with a long-term condition. However, there is limited research into stroke-specific self-management interventions. The aim of this randomized controlled trial was to evaluate the feasibility of delivering the Bridges stroke self-management program in addition to usual stroke rehabilitation compared with usual rehabilitation only. Participants recruited from the referrals to a community stroke team were randomly allocated to the Bridges stroke self-management program, receiving either one session of up to one-hour per week over a six-week period in addition to usual stroke rehabilitation, or usual rehabilitation only. Feasibility was measured using a range of methods to determine recruitment and retention; adherence to the program; suitability and variability of outcome measures used; application and fidelity of the program; and acceptability of the program to patients, carers and professionals. Twenty-five people were recruited to the study over a 13-month period. Eight out of the 12 participants in the Bridges stroke self-management program received all six sessions; there was one withdrawal from the study. There were changes in outcomes between the two groups. Participants who received the Bridges stroke self-management program appeared to have a greater change in self-efficacy, functional activity, social integration and quality of life over the six-week intervention period and showed less decline in mood and quality of life at the three-month follow-up. Professionals found the program acceptable to use in practice, and feedback from participants was broadly positive. The findings from this study appear promising, but questions remain regarding the feasibility of delivering the Bridges stroke self-management program in addition to usual rehabilitation. The dose response of receiving the program cannot be ruled out, and the next stage of research should explore the feasibility of an integrated program. Exploration of the reasons behind relatively low recruitment and of the sensitivity of outcome measures to detect a change are also required. Additional investigation of intervention fidelity is required to monitor if the program is being delivered as intended. © 2013 The Authors. International Journal of Stroke © 2013 World Stroke Organization.
49 CFR 237.103 - Bridge inspection procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Bridge inspection procedures. 237.103 Section 237... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.103 Bridge inspection procedures. (a) Each bridge management program shall specify the procedure to be used for...
49 CFR 237.101 - Scheduling of bridge inspections.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling an...
49 CFR 237.101 - Scheduling of bridge inspections.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling an...
49 CFR 237.103 - Bridge inspection procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Bridge inspection procedures. 237.103 Section 237... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.103 Bridge inspection procedures. (a) Each bridge management program shall specify the procedure to be used for...
49 CFR 237.155 - Documents and records.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Documentation, Records, and Audits of Bridge Management Programs § 237.155 Documents and records. Each track owner required to implement a bridge management... 49 Transportation 4 2012-10-01 2012-10-01 false Documents and records. 237.155 Section 237.155...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2010 CFR
2010-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2011 CFR
2011-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2012 CFR
2012-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2013 CFR
2013-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2014 CFR
2014-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
49 CFR 237.105 - Special inspections.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) Each bridge management program shall prescribe a procedure for protection of train operations and for... limited to a flood, fire, earthquake, derailment or vehicular or vessel impact. (b) Each bridge management...
49 CFR 237.105 - Special inspections.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) Each bridge management program shall prescribe a procedure for protection of train operations and for... limited to a flood, fire, earthquake, derailment or vehicular or vessel impact. (b) Each bridge management...
49 CFR 237.105 - Special inspections.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) Each bridge management program shall prescribe a procedure for protection of train operations and for... limited to a flood, fire, earthquake, derailment or vehicular or vessel impact. (b) Each bridge management...
49 CFR 237.105 - Special inspections.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Each bridge management program shall prescribe a procedure for protection of train operations and for... limited to a flood, fire, earthquake, derailment or vehicular or vessel impact. (b) Each bridge management...
49 CFR 237.105 - Special inspections.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Each bridge management program shall prescribe a procedure for protection of train operations and for... limited to a flood, fire, earthquake, derailment or vehicular or vessel impact. (b) Each bridge management...
Weintraub, William S; Fanari, Zaher; Elliott, Daniel; Ostertag-Stretch, Jennifer; Muther, Ann; Lynahan, Margaret; Kerzner, Roger; Salam, Tabassum; Scherrer, Herbert; Anderson, Sharon; Russo, Carla A; Kolm, Paul; Steinberg, Terri H
2017-07-03
Reducing readmissions and improving metrics of care are a national priority. Supplementing traditional care with care management may improve outcomes. The Bridges program was an initial evaluation of a care management platform (CareLinkHub), supported by information technology (IT) developed to improve the quality and transition of care from hospital to home after percutaneous coronary intervention (PCI) and reduce readmissions. CareLink is comprised of care managers, patient navigators, pharmacists and physicians. Information to guide care management is guided by a middleware layer to gather information, PLR (ColdLight Solutions, LLC) and presented to CareLink staff on a care management platform, Aerial™ (Medecision). An additional analytic engine [Neuron™ (ColdLight Solutions, LLC)] helps, evaluates and guide care. The "Bridges" program enrolled a total of 2054 PCI patients with 2835 admission from April, 1st 2013 through March 1st, 2015. The data of the program was compared with those of 3691 PCI patients with 4414 admissions in the 3years prior to the program. No impact was seen with respect to inpatient and observation readmission, or emergency department visits. Similarly no change was noticed in LDL control. There was minimal improvement in BP control and only in the CTM-3 and SAQ-7 physical limitation scores in the patients' reported outcomes. Patient follow-up with physicians within 1week of discharge improved during the Bridges years. The CareLink hub platform was successfully implemented. Little or no impact on outcome metrics was seen in the short follow-up time. The Bridges program suggests that population health management must be a long-term goal, improving preventive care in the community. Copyright © 2017 Elsevier Inc. All rights reserved.
ERIC Educational Resources Information Center
Johnson, Jennifer Michelle
2016-01-01
Purpose: This paper aims to highlight the potential of science, technology, engineering and mathematics (STEM) summer bridge programs to promote college persistence by fostering a positive science identity among participants that is culturally consistent with the values and experiences of African American students. Design/methodology/approach:…
The need for conducting forensic analysis of decommissioned bridges.
DOT National Transportation Integrated Search
2014-01-01
A limiting factor in current bridge management programs is a lack of detailed knowledge of bridge deterioration : mechanisms and processes. The current state of the art is to predict future condition using statistical forecasting : models based upon ...
Asset management program enhancement plan : baseline assessment phases I and II.
DOT National Transportation Integrated Search
2015-09-01
This project resulted in the development of a framework for making asset management decisions on low-volume bridges. The : research focused on low-volume bridges located in the agricultural counties of Iowa because recent research has shown that thes...
49 CFR 237.151 - Audits; general.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Audits; general. 237.151 Section 237.151..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Documentation, Records, and Audits of Bridge Management Programs § 237.151 Audits; general. Each program adopted to comply with this part shall include provisions...
Bridge scour conference shares knowledge and innovations : Tech Transfer Spotlight
DOT National Transportation Integrated Search
2018-01-01
The National Cooperative Highway Research Programs Domestic Scan (NCHRP Project 20-68A) on bridge scour risk management brought more than 30 national bridge scour experts together for a week in July 2016 to examine ways to prevent and remediate br...
Quality control and quality assurance plan for bridge channel-stability assessments in Massachusetts
Parker, Gene W.; Pinson, Harlow
1993-01-01
A quality control and quality assurance plan has been implemented as part of the Massachusetts bridge scour and channel-stability assessment program. This program is being conducted by the U.S. Geological Survey, Massachusetts-Rhode Island District, in cooperation with the Massachusetts Highway Department. Project personnel training, data-integrity verification, and new data-management technologies are being utilized in the channel-stability assessment process to improve current data-collection and management techniques. An automated data-collection procedure has been implemented to standardize channel-stability assessments on a regular basis within the State. An object-oriented data structure and new image management tools are used to produce a data base enabling management of multiple data object classes. Data will be reviewed by assessors and data base managers before being merged into a master bridge-scour data base, which includes automated data-verification routines.
Bridges to Business. Fund for the Improvement of Postsecondary Education Final Report.
ERIC Educational Resources Information Center
Ironfield, Elaine
Bridges to Business is a dual admissions program between Holyoke Community College (HCC) (Massachusetts) and the School of Management at the University of Massachusetts-Amherst (UMass). Established to attract, educate, and graduate linguistic minority students, the FIPSE-funded program addressed the major problems faced by limited English…
ERIC Educational Resources Information Center
Gorman, Michael F.
2011-01-01
A longitudinal study of information technology (IT) managers at a Fortune 200 company in the Southwest United States was conducted to assess the effectiveness of a training program at bridging the perceived business skills gap for IT employees. A needs assessment was carried out, resulting in a 4-module training program. The program was evaluated…
Weintraub, William S; Elliott, Daniel; Fanari, Zaher; Ostertag-Stretch, Jennifer; Muther, Ann; Lynahan, Margaret; Kerzner, Roger; Salam, Tabassum; Scherrer, Herbert; Anderson, Sharon; Russo, Carla A; Kolm, Paul; Steinberg, Terri H
Reducing readmissions and improving metrics of care are a national priority. Supplementing traditional care with care management may improve outcomes. The Bridges program was an initial evaluation of a care management platform (CareLinkHub), supported by information technology (IT) developed to improve the quality and transition of care from hospital to home after Coronary Artery Bypass Surgery (CABG) and reduce readmissions. CareLink is comprised of care managers, patient navigators, pharmacists and physicians. Information to guide care management is guided by a middleware layer to gather information, PLR (ColdLight Solutions, LLC) and presented to CareLink staff on a care management platform, Aerial™ (Medecision). In addition there is an analytic engine to help evaluate and guide care, Neuron™ (Coldlight Solutions, LLC). The "Bridges" program enrolled a total of 716 CABG patients with 850 admissions from April 2013 through March 2015. The data of the program was compared with those of 1111 CABG patients with 1203 admissions in the 3years prior to the program. No impact was seen with respect to readmissions, Blood Pressure or LDL control. There was no significant improvement in patients' reported outcomes using either the CTM-3 or any of the SAQ-7 scores. Patient follow-up with physicians within 1week of discharge improved during the Bridges years. The CareLink hub platform was successfully implemented. Little or no impact on outcome metrics was seen in the short follow-up time. Copyright © 2017 Elsevier Inc. All rights reserved.
49 CFR 237.31 - Adoption of bridge management programs.
Code of Federal Regulations, 2013 CFR
2013-10-01
... prevent the deterioration of railroad bridges by preserving their capability to safely carry the traffic to be operated over them, and reduce the risk of human casualties, environmental damage, and...
49 CFR 237.31 - Adoption of bridge management programs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... prevent the deterioration of railroad bridges by preserving their capability to safely carry the traffic to be operated over them, and reduce the risk of human casualties, environmental damage, and...
49 CFR 237.31 - Adoption of bridge management programs.
Code of Federal Regulations, 2012 CFR
2012-10-01
... prevent the deterioration of railroad bridges by preserving their capability to safely carry the traffic to be operated over them, and reduce the risk of human casualties, environmental damage, and...
A distributed cloud-based cyberinfrastructure framework for integrated bridge monitoring
NASA Astrophysics Data System (ADS)
Jeong, Seongwoon; Hou, Rui; Lynch, Jerome P.; Sohn, Hoon; Law, Kincho H.
2017-04-01
This paper describes a cloud-based cyberinfrastructure framework for the management of the diverse data involved in bridge monitoring. Bridge monitoring involves various hardware systems, software tools and laborious activities that include, for examples, a structural health monitoring (SHM), sensor network, engineering analysis programs and visual inspection. Very often, these monitoring systems, tools and activities are not coordinated, and the collected information are not shared. A well-designed integrated data management framework can support the effective use of the data and, thereby, enhance bridge management and maintenance operations. The cloud-based cyberinfrastructure framework presented herein is designed to manage not only sensor measurement data acquired from the SHM system, but also other relevant information, such as bridge engineering model and traffic videos, in an integrated manner. For the scalability and flexibility, cloud computing services and distributed database systems are employed. The information stored can be accessed through standard web interfaces. For demonstration, the cyberinfrastructure system is implemented for the monitoring of the bridges located along the I-275 Corridor in the state of Michigan.
A Decision Support System for Concrete Bridge Maintenance
NASA Astrophysics Data System (ADS)
Rashidi, Maria; Lemass, Brett; Gibson, Peter
2010-05-01
The maintenance of bridges as a key element in transportation infrastructure has become a major concern for asset managers and society due to increasing traffic volumes, deterioration of existing bridges and well-publicised bridge failures. A pivotal responsibility for asset managers in charge of bridge remediation is to identify the risks and assess the consequences of remediation programs to ensure that the decisions are transparent and lead to the lowest predicted losses in recognized constraint areas. The ranking of bridge remediation treatments can be quantitatively assessed using a weighted constraint approach to structure the otherwise ill-structured phases of problem definition, conceptualization and embodiment [1]. This Decision Support System helps asset managers in making the best decision with regards to financial limitations and other dominant constraints imposed upon the problem at hand. The risk management framework in this paper deals with the development of a quantitative intelligent decision support system for bridge maintenance which has the ability to provide a source for consistent decisions through selecting appropriate remediation treatments based upon cost, service life, product durability/sustainability, client preferences, legal and environmental constraints. Model verification and validation through industry case studies is ongoing.
Chen, Bingye; Sintov, Nicole
2016-10-24
To achieve energy savings, emerging energy management technologies and programs require customer adoption. Although a variety of models can be used to explain the adoption of energy management technologies and programs, they overlook the seemingly unconventional element of level of affiliation with nature. In fact, connectedness to nature has been identified as an important driver of many pro-environmental behaviors, but its role in pro-environmental technology adoption is also not well understood. Can affiliation with nature help to bridge the apparent gap—and complex chain of events—between sustainable technology adoption and protecting natural resources? Based on survey data from 856 southern Californiamore » residents, this study investigated the influence of connectedness to nature and other factors on intentions to adopt five energy management technologies and programs: using three platforms to monitor home energy use (website, mobile phone application, in-home display); signing up for a time-of-use pricing plan; and participating in demand response events. Regression results showed that nature connectedness was the strongest predictor of all outcomes such that higher nature connectedness predicted greater likelihood of technology and program adoption. In conclusion, these findings suggest that connectedness to nature may facilitate “bridging the logic gap” between sustainable innovation adoption and environmental protection.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-13
.../Veterans Memorial Bridge across Point Pleasant Canal, NJICW mile 3.0, at Point Pleasant, NJ. This deviation... the Coast Guard, revealed that the bridge opened for vessels 1 and 0 times during the months of March...., Bridge Program Manager, Fifth Coast Guard District. [FR Doc. 2012-5978 Filed 3-12-12; 8:45 am] BILLING...
Bridge-Scour Data Management System user's manual
Landers, Mark N.; Mueller, David S.; Martin, Gary R.
1996-01-01
The Bridge-Scour Data Management System (BSDMS) supports preparation, compilation, and analysis of bridge-scour data. The BSDMS provides interactive storage, retrieval, selection, editing, and display of bridge-scour data sets. Bridge-scour data sets include more than 200 site and measurement attributes of the channel geometry, flow hydraulics, hydrology, sediment, geomorphic-setting, location, and bridge specifications. This user's manual provides a general overview of the structure and organization of BSDMS data sets and detailed instructions to operate the program. Attributes stored by the BSDMS are described along with an illustration of the input screen where the attribute can be entered or edited. Measured scour depths can be compared with scour depths predicted by selected published equations using the BSDMS. The selected published equations available in the computational portion of the BSDMS are described. This manual is written for BSDMS, version 2.0. The data base will facilitate: (1) developing improved estimators of scour for specific regions or conditions; (2) describing scour processes; and (3) reducing risk from scour at bridges. BSDMS is available in DOS and UNIX versions. The program was written to be portable and, therefore, can be used on multiple computer platforms. Installation procedures depend on the computer platform, and specific installation instructions are distributed with the software. Sample data files and data sets of 384 pier-scour measurements from 56 bridges in 14 States are also distributed with the software.
An expert system as applied to bridges : software development phase.
DOT National Transportation Integrated Search
1989-01-01
This report describes the results of the third of a four-part study dealing with the use of a computerized expert system to assist bridge engineers in their structures management program. In this phase of the study, software (called DOBES) was writte...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-08
.... Wright, Program Manager, Docket Operations, telephone 202-366-9826. SUPPLEMENTARY INFORMATION: Public... MBTA has instituted single track operation, a reduction of speed, and prohibited braking on the bridge... the bridge. The delay of necessary repair operations would result in increased costs, delay the date...
The RN-BSN Bridge Course: Transitioning the Re-Entry Learner.
ERIC Educational Resources Information Center
Huston, Carol; Shovein, Julia; Damazo, Becky; Fox, Sherry
2001-01-01
A 6-week bridge course designed to ease the transition of registered nurses into baccalaureate degree programs focused on critical thinking, learning styles, professional roles, values clarification, time management, and career planning. It also oriented students to Web Course Tools, used for distance learning. Outcomes included role and campus…
Ribbon cutting opens new ELV offices
NASA Technical Reports Server (NTRS)
2000-01-01
The audience applauds and enjoys the official opening of the E&O Building as the new site of the Expendable Launch Vehicle Program. Home for NASA's unmanned missions since 1964, the building has been renovated to house the ELV Program. Cutting the ribbon for the event were Deputy Manager of the ELV and Payload Carrier Programs, Steve Francois; Director of ELV Launch Services, Michael Benik; Center Director Roy Bridges; Manager of the ELV and Payload Carrier Programs, Bobby Bruckner; and Senior Manager of the Boeing ELV Program Support office, Jim Schofield.
2000-11-08
The audience applauds and enjoys the official opening of the E&O Building as the new site of the Expendable Launch Vehicle Program. Home for NASA’s unmanned missions since 1964, the building has been renovated to house the ELV Program.; Cutting the ribbon for the event were Deputy Manager of the ELV and Payload Carrier Programs, Steve Francois; Director of ELV Launch Services, Michael Benik; Center Director Roy Bridges; Manager of the ELV and Payload Carrier Programs, Bobby Bruckner; and Senior Manager of the Boeing ELV Program Support office, Jim Schofield
78 FR 76195 - Drawbridge Operation Regulations; Passaic River, Newark and Harrison, NJ
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-17
... requests for bridge openings at the Dock Bridge for the past three years. Vessels that can pass under the... INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Mr. Joe Arca, Project... questions on viewing the docket, call Barbara Hairston, Program Manager, Docket Operations, telephone 202...
Bridging the Gap: The Halifax New Teacher Support Program
ERIC Educational Resources Information Center
Power, Alayne
2013-01-01
New teachers require specific and targeted support, as witnessed by alarming rates of attrition in their first years in the profession. Research shows they often struggle to bridge the gap between their university study and effective practice, especially with issues such as assessment, classroom management and diversity. New teachers should have…
Bridging the Generation Gap: "Growing Golf" through an Action Learning Activity
ERIC Educational Resources Information Center
Elbert, Norb; Cumiskey, Kevin J.
2014-01-01
This paper describes an action learning simulation designed for a Professional Golf Management (PGM) program housed in a College of Business of a public university. The PGA Golf Management University Program, a 4.5- to 5-year college curriculum for aspiring PGA Professionals is offered at 19 PGA accredited universities nationwide. The program…
Bridging Theory and Practice in an Applied Retail Track
ERIC Educational Resources Information Center
Lange, Fredrik; Rosengren, Sara; Colliander, Jonas; Hernant, Mikael; Liljedal, Karina T.
2018-01-01
In this article, we present an educational approach that bridges theory and practice: an applied retail track. The track has been co-created by faculty and 10 partnering retail companies and runs in parallel with traditional courses during a 3-year bachelor's degree program in retail management. The underlying pedagogical concept is to move retail…
Bridging the Divide between Safety and Risk Management for your Project or Program
NASA Technical Reports Server (NTRS)
Lutomski, Mike
2005-01-01
This presentation will bridge the divide between these separate but overlapping disciplines and help explain how to use Risk Management as an effective management decision support tool that includes safety. Risk Management is an over arching communication tool used by management to prioritize and effectively mitigate potential problems before they concur. Risk Management encompasses every kind of potential problem that can occur on a program or project. Some of these are safety issues such as hazards that have a specific likelihood and consequence that need to be controlled and included to show an integrated picture of accepted) mitigated, and residual risk. Integrating safety and other assurance disciplines is paramount to accurately representing a program s or projects risk posture. Risk is made up of several components such as technical) cost, schedule, or supportability. Safety should also be a consideration for every risk. The safety component can also have an impact on the technical, cost, and schedule aspect of a given risk. The current formats used for communication of safety and risk issues are not consistent or integrated. The presentation will explore the history of these disciplines, current work to integrate them, and suggestions for integration for the future.
Development of the digital design environment ProjectWise(TM) - phase 1.
DOT National Transportation Integrated Search
2017-04-28
The goal of this research was to develop a project document management system capable of managing : Connecticut Department of Transportation (CTDOT) Capital Road and Bridge Program. Primary targets of : research and development included the system, c...
Meeting Environmental Requirements after a Bridge Collapse
DOT National Transportation Integrated Search
2000-11-01
This document is an update to the Freeway Incident Management Handbook, published in 1991 by the FHWA. It provides detail on important elements of successful incident management programs, as well as field operations. It includes new and advanced inci...
Fire Modeling Institute 2011 Annual Report
Robin J. Innes
2012-01-01
The Fire Modeling Institute (FMI), a part of the Rocky Mountain Research Station, Fire, Fuel, and Smoke Science Program, provides a bridge between scientists and managers. The mission of FMI is to bring the best available science and technology developed throughout the research community to bear on fire-related management issues across the nation. Resource management...
Code of Federal Regulations, 2011 CFR
2011-04-01
... appropriate, to develop by rule safety, bridge, pavement, and congestion management systems for roads funded... TO THE BUREAU OF INDIAN AFFAIRS AND THE INDIAN RESERVATION ROADS PROGRAM Bureau of Indian Affairs...
Code of Federal Regulations, 2010 CFR
2010-04-01
... appropriate, to develop by rule safety, bridge, pavement, and congestion management systems for roads funded... TO THE BUREAU OF INDIAN AFFAIRS AND THE INDIAN RESERVATION ROADS PROGRAM Bureau of Indian Affairs...
Candidate Technologies for the Integrated Health Management Program
NASA Technical Reports Server (NTRS)
Johnson, Neal F., Jr.; Martin, Fred H.
1993-01-01
The purpose of this report is to assess Vehicle Health Management (VHM) technologies for implementation as a demonstration. Extensive studies have been performed to determine technologies which could be implemented on the Atlas and Centaur vehicles as part of a bridging program. This paper discusses areas today where VHM can be implemented for benefits in reliability, performance, and cost reduction. VHM Options are identified and one demonstration is recommended for execution.
Introduction to the Delaware River Port Authority's Smart Bridges initiative
NASA Astrophysics Data System (ADS)
Box, Robert A.; McCullough, Patrick J.; Bistline, Robert S.
2000-06-01
The Delaware River Port Authority, whose mission is to manage, plan and construct transportation facilities and provide transportation services to maximize the safe and efficient movement of people and freight within the Delaware River Valley, located in southwestern Pennsylvania and southern New Jersey, is a self-financing, bi-state Authority, formed by a compact between the Commonwealth of Pennsylvania and the State of New Jersey and approved by the Congress of the United States. The Delaware River Port Authority is firmly committed to the strategic and integrated use of advanced transportation technology to improve traffic flow, operational efficiency and safety on DRPA's four bridges. To this end, the Delaware River Port Authority has initiated a program, appropriately named 'Smart Bridges.' The Delaware River Port Authority has recognized that this type of program is essential to the advancement of the DRPA's mission as an efficient, customer- friendly transportation and regional development agency. Under the Smart Bridges program the Delaware River Port Authority is introducing new technology into its aging infrastructure and transportation systems to ensure that the facilities continue to serve the region into the 21st century and beyond. Initiatives introduced under this program include EZ Pass, video surveillance systems, computerized traffic control systems and partnering with local universities to investigate the application of various innovative technologies to assist in the maintenance of the bridge facilities.
Bridging the gap between strategic and management forest inventories
Ronald E. McRoberts
2009-01-01
Strategic forest inventory programs collect information for a large number of variables on a relatively sparse array of field plots. Data from these inventories are used to produce estimates for large areas such as states and provinces, regions, or countries. The purpose of management forest inventories is to guide management decisions for small areas such as stands....
2003-06-18
KENNEDY SPACE CENTER, FLA. - Alan Thirkettle (center), International Space Station Program manager for Node 2, European Space Agency (ESA); and NASA’s Michael C. Kostelnik (right), deputy associate administrator for International Space Station and Shuttle Programs, sign documents officially transferring ownership of Node 2 between the ESA and NASA. At left, also part of the signing, is Andrea Lorenzoni (left), International Space Station Program manager for Node 2, Italian Space Agency. NASA's Node 2, built by ESA in Italy, arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope), arrived at KSC on June 4. It is Japan's primary contribution to the Station. Emceed by Lisa Malone, deputy director of External Relations and Business Development at KSC, the ceremony also included these speakers: Center Director Roy Bridges Jr.; NASA’s William Gerstenmaier, International Space Station Program manager; and Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.
Ashley, Michael; Cooper, Katelyn M.; Cala, Jacqueline M.; Brownell, Sara E.
2017-01-01
Summer bridge programs are designed to help transition students into the college learning environment. Increasingly, bridge programs are being developed in science, technology, engineering, and mathematics (STEM) disciplines because of the rigorous content and lower student persistence in college STEM compared with other disciplines. However, to our knowledge, a comprehensive review of STEM summer bridge programs does not exist. To provide a resource for bridge program developers, we conducted a systematic review of the literature on STEM summer bridge programs. We identified 46 published reports on 30 unique STEM bridge programs that have been published over the past 25 years. In this review, we report the goals of each bridge program and whether the program was successful in meeting these goals. We identify 14 distinct bridge program goals that can be organized into three categories: academic success goals, psychosocial goals, and department-level goals. Building on the findings of published bridge reports, we present a set of recommendations for STEM bridge programs in hopes of developing better bridges into college. PMID:29146667
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, Bingye; Sintov, Nicole
To achieve energy savings, emerging energy management technologies and programs require customer adoption. Although a variety of models can be used to explain the adoption of energy management technologies and programs, they overlook the seemingly unconventional element of level of affiliation with nature. In fact, connectedness to nature has been identified as an important driver of many pro-environmental behaviors, but its role in pro-environmental technology adoption is also not well understood. Can affiliation with nature help to bridge the apparent gap—and complex chain of events—between sustainable technology adoption and protecting natural resources? Based on survey data from 856 southern Californiamore » residents, this study investigated the influence of connectedness to nature and other factors on intentions to adopt five energy management technologies and programs: using three platforms to monitor home energy use (website, mobile phone application, in-home display); signing up for a time-of-use pricing plan; and participating in demand response events. Regression results showed that nature connectedness was the strongest predictor of all outcomes such that higher nature connectedness predicted greater likelihood of technology and program adoption. In conclusion, these findings suggest that connectedness to nature may facilitate “bridging the logic gap” between sustainable innovation adoption and environmental protection.« less
Addressing the academic gap between 4- and 6-year pharmacy programs in South Korea.
Yoo, Sujin; Song, Seungyeon; Lee, Sangmi; Kwon, Kwangil; Kim, Eunyoung
2014-10-15
To address the academic gap (or lack of adequate training and programs) between 4- and 6-year pharmacy programs and suggest methods for reducing this gap and to evaluate pharmacists' perceptions of preceptorship. We surveyed a convenience sample of 200 community pharmacists who graduated from a 4-year program who were participating in a continuing education program for clinical pharmacy as organized by the Daejeon branch of the Korea Pharmaceutical Association in 2011. Twenty-one questions were asked about the academic gap, needs for an education program, preceptorship, and medication therapy management services. International precedents were examined through a literature review to glean ideas of how to bridge the academic gap between the 4- and 6-year programs. In total, 132 pharmacists answered the survey (return rate=66.0%). The survey findings included problems caused by the academic gap, high need for an adequate education program, low acceptability of preceptorship, and the possibility of medication therapy management services. US-based, non-traditional PharmD programs and new curriculum-support training in Japan provided examples of how the academic gap has been successfully bridged. Nationwide efforts and government support are urgently required to close the academic gap, and experiential education should be included in transitional programs for 4-year pharmacy program pharmacists.
77 FR 27115 - Drawbridge Operation Regulation; Bayou Boeuf, Amelia, LA
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-09
... schedule that governs the Burlington Northern Santa Fe (BNSF) Railway Company swing span bridge across... docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202-366-9826. SUPPLEMENTARY...
77 FR 24146 - Drawbridge Operation Regulation; Columbia River, Vancouver, WA
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-23
... schedule that governs the Burlington Northern Santa Fe (BNSF) Railway Bridge across the Columbia River... viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202-366-9826...
77 FR 69564 - Drawbridge Operation Regulation; Bayou Boeuf, Amelia, LA
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-20
... schedule that governs the Burlington Northern Santa Fe (BNSF) Railway Company swing span bridge across... viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202-366-9826...
77 FR 42637 - Drawbridge Operation Regulation; Bayou Boeuf, Amelia, LA
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-20
... schedule that governs the Burlington Northern Santa Fe (BNSF) Railway Company swing span bridge across... viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202-366-9826...
ODOT research news : spring 2005.
DOT National Transportation Integrated Search
2005-01-01
The newsletter includes: : 1) New Projects Selected; : 2) Commercial Products R&D Program; : 3) Managing a Multitude of Drainage Facilities; : 4) ODOT Helps with Seismography Network; : 5) Methods for Inspecting Composite-Strengthened Bridges; : 6) O...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-09
... INFORMATION CONTACT: If you have questions on this rule, call or email Mr. Jim Rousseau, Bridge Management Specialist, Fifth Coast Guard District; telephone: (757) 398-6557; Email: [email protected] . If you have any questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations...
Integrating modal-based NDE techniques and bridge management systems using quality management
NASA Astrophysics Data System (ADS)
Sikorsky, Charles S.
1997-05-01
The intent of bridge management systems is to help engineers and managers determine when and where to spend bridge funds such that commerce and the motoring public needs are satisfied. A major shortcoming which states are experiencing is the NBIS data available is insufficient to perform certain functions required by new bridge management systems, such as modeling bridge deterioration and predicting costs. This paper will investigate how modal based nondestructive damage evaluation techniques can be integrated into bridge management using quality management principles. First, quality from the manufacturing perspective will be summarized. Next, the implementation of quality management in design and construction will be reinterpreted for bridge management. Based on this, a theory of approach will be formulated to improve the productivity of a highway transportation system.
Ashley, Michael; Cooper, Katelyn M; Cala, Jacqueline M; Brownell, Sara E
2017-01-01
Summer bridge programs are designed to help transition students into the college learning environment. Increasingly, bridge programs are being developed in science, technology, engineering, and mathematics (STEM) disciplines because of the rigorous content and lower student persistence in college STEM compared with other disciplines. However, to our knowledge, a comprehensive review of STEM summer bridge programs does not exist. To provide a resource for bridge program developers, we conducted a systematic review of the literature on STEM summer bridge programs. We identified 46 published reports on 30 unique STEM bridge programs that have been published over the past 25 years. In this review, we report the goals of each bridge program and whether the program was successful in meeting these goals. We identify 14 distinct bridge program goals that can be organized into three categories: academic success goals, psychosocial goals, and department-level goals. Building on the findings of published bridge reports, we present a set of recommendations for STEM bridge programs in hopes of developing better bridges into college. © 2017 M. Ashley, K. M. Cooper, et al. CBE—Life Sciences Education © 2017 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).
Bridge Programs in Illinois: Results of the 2010 Illinois Bridge Status Survey
ERIC Educational Resources Information Center
Taylor, J. L.; Harmon, T.
2010-01-01
This report provides a summary of major results of the Illinois Bridge Status Survey, administered online between April and June 2010. The purpose of the survey was to understand the extent to which bridge programs are being implemented in Illinois, as well as to build an online directory of bridge programs. Bridge programs are an emerging…
A data management infrastructure for bridge monitoring
NASA Astrophysics Data System (ADS)
Jeong, Seongwoon; Byun, Jaewook; Kim, Daeyoung; Sohn, Hoon; Bae, In Hwan; Law, Kincho H.
2015-04-01
This paper discusses a data management infrastructure framework for bridge monitoring applications. As sensor technologies mature and become economically affordable, their deployment for bridge monitoring will continue to grow. Data management becomes a critical issue not only for storing the sensor data but also for integrating with the bridge model to support other functions, such as management, maintenance and inspection. The focus of this study is on the effective data management of bridge information and sensor data, which is crucial to structural health monitoring and life cycle management of bridge structures. We review the state-of-the-art of bridge information modeling and sensor data management, and propose a data management framework for bridge monitoring based on NoSQL database technologies that have been shown useful in handling high volume, time-series data and to flexibly deal with unstructured data schema. Specifically, Apache Cassandra and Mongo DB are deployed for the prototype implementation of the framework. This paper describes the database design for an XML-based Bridge Information Modeling (BrIM) schema, and the representation of sensor data using Sensor Model Language (SensorML). The proposed prototype data management framework is validated using data collected from the Yeongjong Bridge in Incheon, Korea.
Fire Modeling Institute: FY2012 Annual Report: Bridging scientists and managers
Robin J. Innes
2013-01-01
The Fire Modeling Institute (FMI) brings the best available fire and fuel science and technology developed throughout the research community to bear in fire-related management issues. Although located within the Fire, Fuel, and Smoke Science Program of the U.S. Forest Service Rocky Mountain Research Station, FMI is a national and international resource, serving fire...
The Anatomy of Program Design for an On-Line Business Management Course
ERIC Educational Resources Information Center
Barger, Bonita
2008-01-01
How does one design an on-line course to bridge theory and practice? How can the feedback of on-going stakeholder (student and administration) be incorporated into the design process to enhance quality? This paper presents the theoretical underpinning of designing an on-line management course recognized as best practice for a "well organized…
2003-06-18
KENNEDY SPACE CENTER, FLA. - Lisa Malone, deputy director of External Relations and Business Development at KSC, emcees a ceremony in the Space Station Processing Facility to highlight the arrival of two major components of the International Space Station. NASA's Node 2, built by the European Space Agency (ESA) in Italy arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope) arrived at KSC on June 4. It is Japan's primary contribution to the Station. The ceremony held today included the official transfer of ownership signing of Node 2 between the ESA and NASA.. Speakers at the ceremony included KSC Director Roy Bridges Jr.; NASA's Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs, and William Gerstenmaier, International Space Station Program manager; Alan Thirkettle, International Space Station Program manager for Node 2, ESA; Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency; Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.
2003-06-18
KENNEDY SPACE CENTER, FLA. - Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency; Alan Thirkettle, International Space Station Program manager for Node 2, European Space Agency (ESA); and NASA’s Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs, sign documents officially transferring ownership of Node 2 between the ESA and NASA. The signing was part of a ceremony highlighting the arrival of two major components of the International Space Station. NASA's Node 2, built by the European Space Agency (ESA) in Italy, arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module (above right) of the Japanese Experiment Module (JEM), named "Kibo" (Hope), arrived at KSC on June 4. It is Japan's primary contribution to the Station. Emceed by Lisa Malone (far left), deputy director of External Relations and Business Development at KSC, the ceremony also included these speakers: Center Director Roy Bridges Jr.; NASA’s William Gerstenmaier, International Space Station Program manager; and Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.
Management for Educational Development in Sri Lanka.
ERIC Educational Resources Information Center
Fernando, Neil, Ed.
This document reports on 4 broad action programs, constituting a total of 15 projects, in 4 pilot districts in Sri Lanka. The programs, part of a larger effort by the Ministry of Education to actualize policy guidelines, have been attempts to bridge gaps between the capability and efficiency of the established school system and the multiple levels…
ERIC Educational Resources Information Center
Noyek, Arnold M.; Skinner, Harvey; Davis, Dave; Clark, Ian; Sriharan, Abi; Chalin, Catherine G.
2005-01-01
In this article, we present an educational approach uniquely linked to humanitarian and peace-building goals in conflicted regions of the world. We examine the Canada International Scientific Exchange Program and its lead program, the Middle East Association for Managing Hearing Loss, as a case study. Under a Canadian umbrella, continuing medical…
Evaluation of fleet management techniques for timber highway bridges
Brent M. Phares; Travis K. Hosteng; Justin Dahlberg; Michael A. Ritter
2011-01-01
The general condition of the nation's bridges presents a complex management issue when considering cost, safety, and time. Consequently, the management of those bridges can become an overwhelming task. The need for a management system that is specific to rural systems may help to improve the management of this significant number of bridges. Although individual...
23 CFR 650.313 - Inspection procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
...) Quality control and quality assurance. Assure systematic quality control (QC) and quality assurance (QA... periodic field review of inspection teams, periodic bridge inspection refresher training for program managers and team leaders, and independent review of inspection reports and computations. (h) Follow-up on...
76 FR 70345 - Drawbridge Operation Regulations; Elizabeth River, Eastern Branch, Norfolk, VA
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-14
... 33 CFR 117.1007(a) to facilitate laying new rail. Under the current operation schedule, the draw...., Bridge Program Manager, Fifth Coast Guard District. [FR Doc. 2011-29236 Filed 11-10-11; 8:45 am] BILLING...
Ridesharing: Transportation demand management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Valdez, R.; Wang, J.; Flynn, C.P.
1989-01-01
The 13 papers in the report deal with the following areas: Comparison of transportation demand management market research study results and transportation management association development in three suburban activity centers; Ten cities' strategies for transportation demand management; Key considerations for developing local government transportation system management programs; First Hill Action Plan: A unique public/private approach to transportation demand management; Comparison of travel behavior before and after the opening of HOV lanes in a suburban travel corridor; Evaluation of Springfield instant carpooling; George Washington Bridge bus-carpool lane: 1-Year Operational Report; Guaranteed Ride Home: An insurance program for HOV users; Evaluation ofmore » Ridefinders and Central Richmond Association's transportation and parking information service; Vanpools: Pricing and market penetration; Cost-effectiveness of private employer ridesharing programs: An employer's assessment; Temporal analysis of handicapped ridership in specialized transportation service: Lexington/Fayette County experience; Characterization of the 'publico' system of Puerto Rico.« less
A Management Plan for Historic Bridges in Virginia : The 2017 Update
DOT National Transportation Integrated Search
2018-04-01
A Management Plan for Historic Bridges in Virginia, published in 2001, identified the management and treatment needs for 55 historic bridges in Virginia (i.e., bridges that were individually eligible for or listed on the National Register of Historic...
CSTI high capacity power. [Civil Space Technology Initiative
NASA Technical Reports Server (NTRS)
Winter, Jerry M.
1989-01-01
In FY-88, the Advanced Technology Program was incorporated into NASA's Civil Space Technology Initiative (CSTI). The CSTI Program was established to provide the foundation for technology development in automation and robotics, information, propulsion, and power. The CSTI High Capacity Power Program builds on the technology efforts of the SP-100 program, incorporates the previous NASA SP-100 Advanced Technology project, and provides a bridge to NASA Project Pathfinder. The elements of CSTI High Capacity Power development include Converrsion Systems, Thermal Management, Power Management, System Diagnostics, and Environmental Interactions. Technology advancement in all areas, including materials, is required to assure the high reliability and 7 to 10 year lifetime demanded for future space nuclear power systems.
Bridge health monitoring metrics : updating the bridge deficiency algorithm.
DOT National Transportation Integrated Search
2009-10-01
As part of its bridge management system, the Alabama Department of Transportation (ALDOT) must decide how best to spend its bridge replacement funds. In making these decisions, ALDOT managers currently use a deficiency algorithm to rank bridges that ...
Nancy L. Shaw; Berta Youtie; Peggy Olwell
2011-01-01
The Native Plant Materials Development Program was authorized by the U.S. Department of the Interior and Related Agencies Appropriations Act of FY2001 to provide support for development of native plant materials required for restoration of disturbed public lands in the U.S.A. The Washington, DC, Office of the USDI Bureau of Land Management has provided national...
Magowe, Mabel Km; Ledikwe, Jenny H; Kasvosve, Ishmael; Martin, Robert; Thankane, Kabo; Semo, Bazghina-Werq
2014-01-01
To address the shortage of laboratory scientists in Botswana, an innovative, one-year academic bridging program was initiated at the University of Botswana, to advance diploma-holding laboratory technicians towards becoming laboratory scientists holding Bachelor's degrees. An evaluation was conducted, which described the outcomes of the program and the lessons learned from this novel approach to meeting human resource needs. This was a cross-sectional, mixed-methods evaluation. Qualitative interviews were conducted with graduates of the Bachelor of Science (BSc) Medical Laboratory Sciences (MLS) bridging program, along with the graduates' current supervisors, and key informants who were involved in program development or implementation. The quantitative data collected included a written questionnaire, completed by program graduates, with a retrospective pre-test/post-test survey of graduates' confidence, in terms of key laboratory competencies. The BSc MLS bridging program produced thirty-three laboratory scientists over 3 years. There was a significant increase in confidence among graduates, for specified competencies, after the program (P<0.05). Graduates reported acquiring new skills and, often, accepting new responsibilities at their former workplace, particularly in relationship to leadership and management. Five graduates enrolled in advanced degree programs. Most graduates assumed increased responsibility. However, only two graduates were promoted after completing the training program. The lessons learned include: the importance of stakeholder involvement, the need for data to identify local needs, financial sustainability, catering for the needs of adult learners, and ensuring a technically challenging work environment, conducive to the application of skills learned during training. A strong public health and clinical laboratory system is essential for the rapid detection and control of emerging health threats, and for patient care. However, there is a need to adequately prepare laboratory human resources, to ensure efficient and effective laboratory services. Advancement of laboratory technicians towards becoming laboratory scientists, through a bridging program, can provide the necessary skills within a short time.
2003-06-18
KENNEDY SPACE CENTER, FLA. - Center Director Roy Bridges Jr. speaks to the media and guests gathered in the Space Station Processing Facility for a ceremony to highlight the arrival of two major components of the International Space Station. NASA's Node 2, built by the European Space Agency (ESA) in Italy arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope) arrived at KSC on June 4. It is Japan's primary contribution to the Station. The ceremony held today included the official transfer of ownership signing of Node 2 between the ESA and NASA.. Emceed by Lisa Malone (far left), deputy director of External Relations and Business Development at KSC, the ceremony also included these speakers: NASA's Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs, and William Gerstenmaier, International Space Station Program manager; Alan Thirkettle, International Space Station Program manager for Node 2, ESA; Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency; Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.
2003-06-18
KENNEDY SPACE CENTER, FLA. - Alan Thirkettle, International Space Station Program manager for Node 2, European Space Agency (ESA), speaks to guests and the media gathered in the Space Station Processing Facility at a ceremony highlighting the arrival of two major components of the International Space Station. NASA's Node 2, built by ESA in Italy, arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope), arrived at KSC on June 4. It is Japan's primary contribution to the Station. The ceremony held today included the official transfer of ownership signing of Node 2 between the ESA and NASA.. Emceed by Lisa Malone, deputy director of External Relations and Business Development at KSC, the ceremony also included these speakers: Center Director Roy Bridges Jr.; NASA’s Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs and William Gerstenmaier, International Space Station Program manager; Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency; and Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.
2003-06-18
KENNEDY SPACE CENTER, FLA. - NASA’s Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs, speaks to guests and the media gathered in the Space Station Processing Facility for a ceremony to highlight the arrival of two major components of the International Space Station. NASA's Node 2, built by the European Space Agency (ESA) in Italy arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope) arrived at KSC on June 4. It is Japan's primary contribution to the Station. The ceremony held today included the official transfer of ownership signing of Node 2 between the ESA and NASA.. Emceed by Lisa Malone, deputy director of External Relations and Business Development at KSC, the ceremony also included these speakers: Center Director Roy Bridges Jr.; William Gerstenmaier, International Space Station Program manager; Alan Thirkettle, International Space Station Program manager for Node 2, ESA; Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency; and Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.
2003-06-18
KENNEDY SPACE CENTER, FLA. - Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency, speaks to guests and the media gathered in the Space Station Processing Facility at a ceremony highlighting the arrival of two major components of the International Space Station. NASA's Node 2, built by the European Space Agency (ESA) in Italy, arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope), arrived at KSC on June 4. It is Japan's primary contribution to the Station. The ceremony held today included the official transfer of ownership signing of Node 2 between the ESA and NASA.. Emceed by Lisa Malone, deputy director of External Relations and Business Development at KSC, the ceremony also included these speakers: Center Director Roy Bridges Jr.; NASA’s Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs and William Gerstenmaier, International Space Station Program manager; Alan Thirkettle, International Space Station Program manager for Node 2, ESA; and Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.
2003-06-18
KENNEDY SPACE CENTER, FLA. - Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan, speaks to guests and the media gathered in the Space Station Processing Facility at a ceremony highlighting the arrival of two major components of the International Space Station. NASA's Node 2, built by the European Space Agency (ESA) in Italy, arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope), arrived at KSC on June 4. It is Japan's primary contribution to the Station. The ceremony held today included the official transfer of ownership signing of Node 2 between the ESA and NASA.. Emceed by Lisa Malone (far left), deputy director of External Relations and Business Development at KSC, the ceremony also included these speakers: Center Director Roy Bridges Jr. (second from left); NASA’s Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs and William Gerstenmaier, International Space Station Program manager; Alan Thirkettle, International Space Station Program manager for Node 2, ESA; and Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency.
2003-06-18
KENNEDY SPACE CENTER, FLA. - At a ceremony highlighting the arrival of two major components of the International Space Station, Node 2 and the Japanese Experiment Module (JEM), ownership of Node 2 was officially transferred between the European Space Agency (ESA) and NASA. Shaking hands after the signing are Alan Thirkettle (center), International Space Station Program manager for Node 2, ESA; and NASA’s Michael C. Kostelnik (right), deputy associate administrator for International Space Station and Shuttle Programs. At left, also part of the signing, is Andrea Lorenzoni (left), International Space Station Program manager for Node 2, Italian Space Agency. NASA's Node 2, built by ESA in Italy, arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope), arrived at KSC on June 4. It is Japan's primary contribution to the Station. Emceed by Lisa Malone, deputy director of External Relations and Business Development at KSC, the ceremony also included these speakers: Center Director Roy Bridges Jr.; NASA’s William Gerstenmaier, International Space Station Program manager; and Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.
2003-06-18
KENNEDY SPACE CENTER, FLA. - Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency, speaks to guests and the media gathered in the Space Station Processing Facility at a ceremony highlighting the arrival of two major components of the International Space Station. NASA's Node 2, built by the European Space Agency (ESA) in Italy, arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope), arrived at KSC on June 4. It is Japan's primary contribution to the Station. The ceremony held today included the official transfer of ownership signing of Node 2 between the ESA and NASA.. Emceed by Lisa Malone (far left), deputy director of External Relations and Business Development at KSC, the ceremony also included these speakers: Center Director Roy Bridges Jr.; NASA’s Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs, and William Gerstenmaier, International Space Station Program manager ; Alan Thirkettle, International Space Station Program manager for Node 2, ESA; and Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.
2003-06-18
KENNEDY SPACE CENTER, FLA. - NASA's Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs, speaks to guests and the media gathered in the Space Station Processing Facility for a ceremony to highlight the arrival of two major components of the International Space Station. NASA's Node 2, built by the European Space Agency (ESA) in Italy arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope) arrived at KSC on June 4. It is Japan's primary contribution to the Station. The ceremony held today included the official transfer of ownership signing of Node 2 between the ESA and NASA.. Emceed by Lisa Malone (far left), deputy director of External Relations and Business Development at KSC, the ceremony also included these speakers: Center Director Roy Bridges Jr. (second from left); William Gerstenmaier, International Space Station Program manager; Alan Thirkettle, International Space Station Program manager for Node 2, ESA; Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency; and Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.
2003-06-18
KENNEDY SPACE CENTER, FLA. - Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan, speaks to guests and the media gathered in the Space Station Processing Facility at a ceremony highlighting the arrival of two major components of the International Space Station. NASA's Node 2, built by the European Space Agency (ESA) in Italy, arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module (above right) of the Japanese Experiment Module (JEM), named "Kibo" (Hope), arrived at KSC on June 4. It is Japan's primary contribution to the Station. The ceremony held today included the official transfer of ownership signing of Node 2 between the ESA and NASA.. Emceed by Lisa Malone (far left), deputy director of External Relations and Business Development at KSC, the ceremony also included these speakers: Center Director Roy Bridges Jr. (second from left); NASA’s Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs and William Gerstenmaier, International Space Station Program manager ; Alan Thirkettle, International Space Station Program manager for Node 2, ESA; and Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency.
2003-06-18
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, media and guests listen intently to remarks during a ceremony to highlight the arrival of two major components of the International Space Station. NASA's Node 2, built by the European Space Agency (ESA) in Italy arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope) arrived at KSC on June 4. It is Japan's primary contribution to the Station. The ceremony held today included the official transfer of ownership signing of Node 2 between the ESA and NASA.. Emceed by Lisa Malone, deputy director of External Relations and Business Development at KSC, the ceremony included these speakers: KSC Director Roy Bridges Jr.; NASA's Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs, and William Gerstenmaier, International Space Station Program manager; Alan Thirkettle, International Space Station Program manager for Node 2, ESA; Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency; Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.
2003-06-18
KENNEDY SPACE CENTER, FLA. - At ceremony highlighting the arrival of two major components of the International Space Station, Node 2 and the Japanese Experiment Module (JEM), ownership of Node 2 was officially transferred between the European Space Agency and NASA. Shaking hands after the signing are Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency; and Alan Thirkettle, International Space Station Program manager for Node 2, European Space Agency (ESA). At right is NASA’s Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs. NASA's Node 2, built by ESA in Italy, arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope), arrived at KSC on June 4. It is Japan's primary contribution to the Station. Emceed by Lisa Malone, deputy director of External Relations and Business Development at KSC, the ceremony also included these speakers: Center Director Roy Bridges Jr.; NASA’s William Gerstenmaier, International Space Station Program manager; and Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.
2003-06-18
KENNEDY SPACE CENTER, FLA. - Center Director Roy Bridges Jr. speaks to the media and guests gathered in the Space Station Processing Facility for a ceremony to highlight the arrival of two major components of the International Space Station. NASA's Node 2, built by the European Space Agency (ESA) in Italy arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope) arrived at KSC on June 4. It is Japan's primary contribution to the Station. The ceremony held today included the official transfer of ownership signing of Node 2 between the ESA and NASA.. Emceed by Lisa Malone (left) , deputy director of External Relations and Business Development at KSC, the ceremony also included these speakers: NASA's Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs, and William Gerstenmaier, International Space Station Program manager; Alan Thirkettle, International Space Station Program manager for Node 2, ESA; Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency; Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.
2003-06-18
KENNEDY SPACE CENTER, FLA. - Center Director Roy Bridges Jr. speaks to the media and guests gathered in the Space Station Processing Facility for a ceremony to highlight the arrival of two major components of the International Space Station. NASA's Node 2, built by the European Space Agency (ESA) in Italy arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope) arrived at KSC on June 4. It is Japan's primary contribution to the Station. The ceremony held today included the official transfer of ownership signing of Node 2 between the ESA and NASA.. Emceed by Lisa Malone (left), deputy director of External Relations and Business Development at KSC, the ceremony also included these speakers: NASA's Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs, and William Gerstenmaier, International Space Station Program manager; Alan Thirkettle, International Space Station Program manager for Node 2, ESA; Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency; Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.
2003-06-18
KENNEDY SPACE CENTER, FLA. - Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan, speaks to guests and the media gathered in the Space Station Processing Facility at a ceremony highlighting the arrival of two major components of the International Space Station. NASA's Node 2, built by the European Space Agency (ESA) in Italy, arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope), arrived at KSC on June 4. It is Japan's primary contribution to the Station. The ceremony held today included the official transfer of ownership signing of Node 2 between the ESA and NASA.. Emceed by Lisa Malone, deputy director of External Relations and Business Development at KSC, the ceremony also included these speakers: Center Director Roy Bridges Jr.; NASA’s Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs and William Gerstenmaier, International Space Station Program manager ; Alan Thirkettle, International Space Station Program manager for Node 2, ESA; and Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency.
2003-06-18
KENNEDY SPACE CENTER, FLA. - Alan Thirkettle, International Space Station Program manager for Node 2, European Space Agency (ESA), speaks to guests and the media gathered in the Space Station Processing Facility at a ceremony highlighting the arrival of two major components of the International Space Station. NASA's Node 2, built by the European Space Agency (ESA) in Italy, arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope), arrived at KSC on June 4. It is Japan's primary contribution to the Station. The ceremony held today included the official transfer of ownership signing of Node 2 between the ESA and NASA.. Emceed by Lisa Malone, deputy director of External Relations and Business Development at KSC, the ceremony also included these speakers: Center Director Roy Bridges Jr.; NASA’s Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs and William Gerstenmaier, International Space Station Program manager; Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency; and Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.
2003-06-18
KENNEDY SPACE CENTER, FLA. - At a ceremony highlighting the arrival of two major components of the International Space Station, William Gerstenmaier, International Space Station Program manager, points to one of the components as he speaks to guests and the media gathered in the Space Station Processing Facility. NASA's Node 2, built by the European Space Agency (ESA) in Italy, arrived at KSC on June 1. It will be the next pressurized module installed on the Station. The pressurized module of the Japanese Experiment Module (JEM), named "Kibo" (Hope), arrived at KSC on June 4. It is Japan's primary contribution to the Station. The ceremony held today included the official transfer of ownership signing of Node 2 between the ESA and NASA.. Emceed by Lisa Malone, deputy director of External Relations and Business Development at KSC, the ceremony also included these speakers: Center Director Roy Bridges Jr.; NASA’s Michael C. Kostelnik, deputy associate administrator for International Space Station and Shuttle Programs; Alan Thirkettle, International Space Station Program manager for Node 2, ESA; Andrea Lorenzoni, International Space Station Program manager for Node 2, Italian Space Agency; and Kuniaki Shiraki, JEM Project manager, National Aerospace and Development Agency of Japan.
33 CFR 157.415 - Bridge resource management policy and procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Bridge resource management policy... Petroleum Oils § 157.415 Bridge resource management policy and procedures. (a) Not later than February 1... in charge of the navigational watch concerning the need for continuously reassessing how bridge-watch...
KSC Center Director Bridges addresses the audience at an ISO 9001 certification ceremony
NASA Technical Reports Server (NTRS)
1998-01-01
Center Director Roy Bridges speaks to KSC employees at the ISO certification ceremony held at the Training Auditorium. Bridges was presented an ISO 9001 certificate and plaque awarded to KSC by Det Norske Veritas (DNV), Inc., an international ISO certification organization. ISO 9001 comprises the most detailed, comprehensive set of standard requirements for quality programs established by the International Standards Organization. The presentation followed a successful independent audit by DNV of the KSC Management System in May of this year. The third-party auditors examined about 20 elements of KSC's system, including management responsibility, design control, documentation, test and inspection, and corrective action procedures. DNV found that KSC met or exceeded the stringent quality standards in all areas. KSC will use this certification as a tool to improve an already world- class team. All NASA centers are required by NASA Administrator Daniel S. Goldin to be ISO 9001 registered by September 1999. NASA is the first federal agency to seek the quality certification. Next to Bridges is Heidi Hollingsworth, with the Center for Independent Living, who uses American Sign Language for any hearing-impaired employees in the audience.
Breaking down Barriers: A Bridge Program Helps First-Year Biology Students Connect with Faculty
ERIC Educational Resources Information Center
Cooper, Katelyn M.; Ashley, Michael; Brownell, Sara E.
2018-01-01
Summer bridge programs often aim to build social connections for first-year students to ease their transition into college, yet few studies have reported on bridge programs successfully leading to these outcomes. We backward designed a summer bridge program for incoming biology majors to increase the comfort and connections among students and…
A Management Plan for Historic Bridges in Virginia: Update / Scoping Phase.
DOT National Transportation Integrated Search
2014-04-01
"The Management Plan for Historic Bridges in Virginia, completed in 2001 (hereinafter the 2001 Management Plan), : identified the management and treatment needs for 54 bridges in Virginia that were individually eligible for or listed on the National ...
Solidifying International Bridges through Communication Teaching.
ERIC Educational Resources Information Center
Hanson, Kaye T.
This paper discusses an ongoing study being conducted at Brigham Young University (BYU) in Utah concerning ways of improving communication teaching to graduate students, especially those in the business administration program. The paper also discusses some current research on language and management and some preliminary results of fourth year…
23 CFR 970.210 - Federal lands bridge management system (BMS).
Code of Federal Regulations, 2014 CFR
2014-04-01
... Section 970.210 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS... needs using, as a minimum, the following components: (1) A database and an ongoing program for the... BMS. The minimum BMS database shall include: (i) Data described by the inventory section of the...
23 CFR 971.210 - Federal lands bridge management system (BMS).
Code of Federal Regulations, 2014 CFR
2014-04-01
... vehicle classification (as appropriate); and (v) A history of conditions and actions taken on each bridge... 23 Highways 1 2014-04-01 2014-04-01 false Federal lands bridge management system (BMS). 971.210... lands bridge management system (BMS). In addition to the requirements provided in § 971.204, the BMS...
23 CFR 971.210 - Federal lands bridge management system (BMS).
Code of Federal Regulations, 2013 CFR
2013-04-01
... vehicle classification (as appropriate); and (v) A history of conditions and actions taken on each bridge... 23 Highways 1 2013-04-01 2013-04-01 false Federal lands bridge management system (BMS). 971.210... lands bridge management system (BMS). In addition to the requirements provided in § 971.204, the BMS...
23 CFR 971.210 - Federal lands bridge management system (BMS).
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Federal lands bridge management system (BMS). 971.210... lands bridge management system (BMS). In addition to the requirements provided in § 971.204, the BMS must meet the following requirements: (a) The tri-party partnership shall have a BMS for the FH bridges...
23 CFR 972.210 - Federal lands bridge management system (BMS).
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Federal lands bridge management system (BMS). 972.210....210 Federal lands bridge management system (BMS). In addition to the requirements provided in § 972.204, the BMS must meet the following requirements: (a) The FWS shall have a BMS for bridges which are...
Development of risk models for Florida's bridge management system.
DOT National Transportation Integrated Search
2013-06-01
Florida Department of Transportation (FDOT) has been actively implementing the American Association of State Highway Transportation Officials (AASHTO) Pontis Bridge Management System (BMS), recently renamed AASHTOWare Bridge Management (BrM), to supp...
Assessment of Risk Evaluation Procedures for USACE Bridges
2018-03-19
upon a well-suited inventory management system, it is too heavily dependent upon subjective assessments by select individuals and that risk of failure...3 Bridge Management Systems...4 3 USACE Bridge Management
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false How will a bridge project be programmed for funding once... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a bridge project be programmed for funding once eligibility has been determined? (a) All projects will be...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false How will a bridge project be programmed for funding once... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a bridge project be programmed for funding once eligibility has been determined? (a) All projects will be...
DOT National Transportation Integrated Search
2013-09-01
The mission of Rutgers Universitys Center for Advanced Infrastructure and Transportation (CAIT) Bridge Resource Program (BRP) is to provide bridge engineering support to the New Jersey Department of Transportation (NJDOT)s Bridge Engineering an...
Environmental Management Science Program Workshop. Proceedings
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1998-07-01
The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as thatmore » performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.« less
23 CFR 970.210 - Federal lands bridge management system (BMS).
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Federal lands bridge management system (BMS). 970.210... Federal lands bridge management system (BMS). In addition to the requirements provided in § 970.204, the BMS must meet the following requirements: (a) The NPS shall have a BMS for the bridges which are under...
33 CFR 116.30 - Administrator, Bridge Administration Program Review and Evaluation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Administrator, Bridge..., DEPARTMENT OF HOMELAND SECURITY BRIDGES ALTERATION OF UNREASONABLY OBSTRUCTIVE BRIDGES § 116.30 Administrator, Bridge Administration Program Review and Evaluation. (a) Upon receiving a Detailed Investigation Report...
H-Bridge Inverter Loading Analysis for an Energy Management System
2013-06-01
In order to accomplish the stated objectives, a physics-based model of the system was developed in MATLAB/Simulink. The system was also implemented ...functional architecture and then compile the high level design down to VHDL in order to program the designed functions to the FPGA. B. INSULATED
Community-based watershed resilience programs that bridge public health and environmental outcomes often require cross-boundary, multi-country collaboration. The CRESSIDA project, led by the Regional Environmental Center for Central and Eastern Europe (REC) and supported by the U...
23 CFR 973.210 - Indian lands bridge management system (BMS).
Code of Federal Regulations, 2011 CFR
2011-04-01
... Section 973.210 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS... framework for a BMS: (1) A database and an ongoing program for the collection and maintenance of the inventory, inspection, cost, and supplemental data needed to support the BMS. The minimum BMS database shall...
23 CFR 973.210 - Indian lands bridge management system (BMS).
Code of Federal Regulations, 2012 CFR
2012-04-01
... Section 973.210 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS... framework for a BMS: (1) A database and an ongoing program for the collection and maintenance of the inventory, inspection, cost, and supplemental data needed to support the BMS. The minimum BMS database shall...
23 CFR 972.210 - Federal lands bridge management system (BMS).
Code of Federal Regulations, 2014 CFR
2014-04-01
... Section 972.210 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS... framework for a BMS: (1) A database and an ongoing program for the collection and maintenance of the inventory, inspection, cost, and supplemental data needed to support the BMS. The minimum BMS database shall...
23 CFR 972.210 - Federal lands bridge management system (BMS).
Code of Federal Regulations, 2011 CFR
2011-04-01
... Section 972.210 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS... framework for a BMS: (1) A database and an ongoing program for the collection and maintenance of the inventory, inspection, cost, and supplemental data needed to support the BMS. The minimum BMS database shall...
23 CFR 972.210 - Federal lands bridge management system (BMS).
Code of Federal Regulations, 2012 CFR
2012-04-01
... Section 972.210 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS... framework for a BMS: (1) A database and an ongoing program for the collection and maintenance of the inventory, inspection, cost, and supplemental data needed to support the BMS. The minimum BMS database shall...
23 CFR 972.210 - Federal lands bridge management system (BMS).
Code of Federal Regulations, 2013 CFR
2013-04-01
... Section 972.210 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS... framework for a BMS: (1) A database and an ongoing program for the collection and maintenance of the inventory, inspection, cost, and supplemental data needed to support the BMS. The minimum BMS database shall...
76 FR 56242 - Meetings of Humanities Panel
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-12
... published in the Federal Register on August 23, 2011, 76 FR 52698. Dates: September 27, 2011. Time: 9 a.m... Cooperative Agreement with NEH to Support Bridging Cultures at Community Colleges, submitted to the Division Education Programs at the August 23, 2011 deadline. Michael P. McDonald, Advisory Committee, Management...
ERIC Educational Resources Information Center
Ashley, Michael; Cooper, Katelyn M.; Cala, Jacqueline M.; Brownell, Sara E.
2017-01-01
Summer bridge programs are designed to help transition students into the college learning environment. Increasingly, bridge programs are being developed in science, technology, engineering, and mathematics (STEM) disciplines because of the rigorous content and lower student persistence in college STEM compared with other disciplines. However, to…
Reduction of earthquake risk in the united states: Bridging the gap between research and practice
Hays, W.W.
1998-01-01
Continuing efforts under the auspices of the National Earthquake Hazards Reduction Program are under way to improve earthquake risk assessment and risk management in earthquake-prone regions of Alaska, California, Nevada, Washington, Oregon, Arizona, Utah, Wyoming, and Idaho, the New Madrid and Wabash Valley seismic zones in the central United States, the southeastern and northeastern United States, Puerto Rico, Virgin Islands, Guam, and Hawaii. Geologists, geophysicists, seismologists, architects, engineers, urban planners, emergency managers, health care specialists, and policymakers are having to work at the margins of their disciplines to bridge the gap between research and practice and to provide a social, technical, administrative, political, legal, and economic basis for changing public policies and professional practices in communities where the earthquake risk is unacceptable. ?? 1998 IEEE.
33 CFR 116.30 - Administrator, Office of Bridge Programs Review and Evaluation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Administrator, Office of Bridge..., DEPARTMENT OF HOMELAND SECURITY BRIDGES ALTERATION OF UNREASONABLY OBSTRUCTIVE BRIDGES § 116.30 Administrator, Office of Bridge Programs Review and Evaluation. (a) Upon receiving a Detailed Investigation Report from...
25 CFR 170.507 - Who reviews bridge inspection reports?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false Who reviews bridge inspection reports? 170.507 Section... ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Bridge Inspection § 170.507 Who reviews bridge inspection reports? The person responsible for the bridge inspection...
Managing IceBridge Airborne Mission Data at the National Snow and Ice Data Center
NASA Astrophysics Data System (ADS)
Brodzik, M.; Kaminski, M. L.; Deems, J. S.; Scambos, T. A.
2010-12-01
Operation IceBridge (OIB) is a NASA airborne geophysical survey mission conducting laser altimetry, ice-penetrating radar profiling, gravimetry and other geophysical measurements to monitor and characterize the Earth's cryosphere. The IceBridge mission will operate from 2009 until after the launch of ICESat-II (currently planned for 2015), and provides continuity of measurements between that mission and its predecessor. Data collection sites include the Greenland and Antarctic Ice Sheets and the sea ice pack regions of both poles. These regions include some of the most rapidly changing areas of the cryosphere. IceBridge is also collecting data in East Antarctica via the University of Texas ICECAP program and in Alaska via the University of Alaska, Fairbanks glacier mapping program. The NSIDC Distributed Active Archive Center at the University of Colorado at Boulder provides data archive and distribution support for the IceBridge mission. Our IceBridge work is based on two guiding principles: ensuring preservation of the data, and maximizing usage of the data. This broadens our work beyond the typical scope of a data archive. In addition to the necessary data management, discovery, distribution, and outreach functions, we are also developing tools that will enable broader use of the data, and integrating diverse data types to enable new science research. Researchers require expeditious access to data collected from the IceBridge missions; our archive approach balances that need with our long-term preservation goal. We have adopted a "fast-track" approach to publish data quickly after collection and make it available via FTP download. Subsequently, data sets are archived in the NASA EOSDIS ECS system, which enables data discovery and distribution with the appropriate backup, documentation, and metadata to assure its availability for future research purposes. NSIDC is designing an IceBridge data portal to allow interactive data search, exploration, and subsetting via a map-based interface. This portal will provide flight line rendering and multi-instrument data previewing capabilities to facilitate use of the wide array of data types, resolutions, and configurations in this dynamic airborne mission. Together with the IceBridge Science Team and Ice Bridge Science Working Groups, NSIDC is generating value-added products from the Ice Bridge data streams and other ancillary data. These products will provide simple, useful combinations of Ice Bridge products and regional maps of important geophysical parameters from other sources. Planned value-added products include: (1) gridded products in which new profiles from Ice Bridge (e.g. elevation or ice thickness) are combined with existing DEMs or bed maps to produce revised grids and (2) flight-profile multi-instrument products in which data from several instruments are combined into ice sheet profiles (surface elevation, ice thickness, internal reflection data, bed reflection intensity, and gravimetry), sea ice profiles (freeboard, snow cover, and thickness), and surface data profiles (elevation, slope, roughness, near-surface layering, and imagery).
DOT National Transportation Integrated Search
2008-08-01
Bridge management is an important activity of transportation agencies in the US : and in many other countries. A critical aspect of bridge management is to reliably predict : the deterioration of bridge structures, so that appropriate or optimal acti...
Cooper, Katelyn M.; Ashley, Michael; Brownell, Sara E.
2017-01-01
National calls to improve student academic success in college have sparked the development of bridge programs designed to help students transition from high school to college. We designed a 2-week Summer Bridge program that taught introductory biology content in an active-learning way. Through a set of exploratory interviews, we unexpectedly identified that Bridge students had developed sophisticated views of active learning, even though this was not an explicit goal of the program. We conducted an additional set of semistructured interviews that focused on active learning and compared the interviews of Bridge students with those from non-Bridge students who had been eligible for but did not participate in the program. We used the constant comparative method to identify themes from the interviews. We found that Bridge students perceived that, because they knew how to approach active learning and viewed it as important, they benefited more from active learning in introductory biology than non-Bridge students. Specifically, Bridge students seemed to be more aware of their own learning gains from participating in active learning. Compared with the majority of non-Bridge students, the majority of Bridge students described using a greater variety of strategies to maximize their experiences in active learning. Finally, in contrast to non-Bridge students, Bridge students indicated that they take an equitable approach to group work. These findings suggest that we may be able to prime students to maximize their own and other’s experiences in active learning. PMID:28232588
Modeling of information on the impact of mining exploitation on bridge objects in BIM
NASA Astrophysics Data System (ADS)
Bętkowski, Piotr
2018-04-01
The article discusses the advantages of BIM (Building Information Modeling) technology in the management of bridge infrastructure on mining areas. The article shows the problems with information flow in the case of bridge objects located on mining areas and the advantages of proper information management, e.g. the possibility of automatic monitoring of structures, improvement of safety, optimization of maintenance activities, cost reduction of damage removal and preventive actions, improvement of atmosphere for mining exploitation, improvement of the relationship between the manager of the bridge and the mine. Traditional model of managing bridge objects on mining areas has many disadvantages, which are discussed in this article. These disadvantages include among others: duplication of information about the object, lack of correlation in investments due to lack of information flow between bridge manager and mine, limited assessment possibilities of damage propagation on technical condition and construction resistance to mining influences.
1998-08-11
Center Director Roy Bridges speaks to KSC employees at the ISO certification ceremony held at the Training Auditorium. Bridges was presented an ISO 9001 certificate and plaque awarded to KSC by Det Norske Veritas (DNV), Inc., an international ISO certification organization. ISO 9001 comprises the most detailed, comprehensive set of standard requirements for quality programs established by the International Standards Organization. The presentation followed a successful independent audit by DNV of the KSC Management System in May of this year. The third-party auditors examined about 20 elements of KSC's system, including management responsibility, design control, documentation, test and inspection, and corrective action procedures. DNV found that KSC met or exceeded the stringent quality standards in all areas. KSC will use this certification as a tool to improve an already worldclass team. All NASA centers are required by NASA Administrator Daniel S. Goldin to be ISO 9001 registered by September 1999. NASA is the first federal agency to seek the quality certification. Next to Bridges is Heidi Hollingsworth, with the Center for Independent Living, who uses American Sign Language for any hearing-impaired employees in the audience
Volunteer Middle Managers: Human Resources That Extend Programmatic Outreach
ERIC Educational Resources Information Center
Cassill, Heather; Culp, Ken, III; Hettmansperger, Jay; Stillwell, Marla; Sublet, Amanda
2012-01-01
Extension professionals must be able to give volunteers programmatic ownership, resources, and the education needed to complete tasks. However, resources such as time and money are limited, especially in economic downtimes, making it even more necessary to look at creative ways to bridge the gap between what programs and services can and should be…
78 FR 42010 - Drawbridge Operation Regulation; Isle of Wight (Sinepuxent) Bay, Ocean City, MD
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-15
... Station Ocean City reveals that, in the past, vessel traffic for that time of year is very limited with... INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Kashanda Booker, Bridge... . If you have questions on viewing the docket, call Barbara Hairston, Program Manager, Docket...
23 CFR 971.210 - Federal lands bridge management system (BMS).
Code of Federal Regulations, 2012 CFR
2012-04-01
... Section 971.210 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS... components, as a minimum, as a basic framework for a BMS: (1) A database and an ongoing program for the... BMS. The minimum BMS database shall include: (i) The inventory data required by the NBIS (23 CFR 650...
23 CFR 971.210 - Federal lands bridge management system (BMS).
Code of Federal Regulations, 2011 CFR
2011-04-01
... Section 971.210 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS... components, as a minimum, as a basic framework for a BMS: (1) A database and an ongoing program for the... BMS. The minimum BMS database shall include: (i) The inventory data required by the NBIS (23 CFR 650...
NASA Astrophysics Data System (ADS)
Agüeros, Marcel A.
2015-01-01
Columbia University's Bridge to the Ph.D. in the Natural Sciences Program aims to enhance the participation of students from underrepresented groups in Ph.D. programs. To achieve this, the Bridge Program provides an intensive research, coursework, and mentoring experience to post-baccalaureates seeking to strengthen their graduate school applications and to prepare for the transition into graduate school. To date, 20 Bridge Program alumni --- including four in astronomy --- have gone on to Ph.D. programs at Columbia, the University of Michigan, Johns Hopkins, the University of Washington, Albert Einstein, Yale, and SUNY-Albany, among others. In this talk, I will touch on some of the connections between Pre-MAP and the Bridge Program, and particularly how my involvement in the former prepared me to lead the latter.
Long-Term Bridge Performance (LTBP) Program Protocols, Version 1
DOT National Transportation Integrated Search
2016-01-01
The Long-Term Bridge Performance (LTBP) Program is a long-term research effort to collect scientific performance data from a representative sample of bridges in the United States. Data will be collected for in-service bridges using a variety of techn...
DOT National Transportation Integrated Search
2013-09-01
The mission of Rutgers Universitys Center for Advanced Infrastructure and Transportation (CAIT) Bridge Resource Program : (BRP) is to provide bridge engineering support to the New Jersey Department of Transportation (NJDOT)s Bridge : Engineerin...
ERIC Educational Resources Information Center
Cooper, Katelyn M.; Ashley, Michael; Brownell, Sara E.
2017-01-01
National calls to improve student academic success in college have sparked the development of bridge programs designed to help students transition from high school to college. We designed a 2-week Summer Bridge program that taught introductory biology content in an active-learning way. Through a set of exploratory interviews, we unexpectedly…
Kim, Mi Ja; Holm, Karyn; Gerard, Peggy; McElmurry, Beverly; Foreman, Mark; Poslusny, Susan; Dallas, Constance
2009-01-01
Nursing has a shortage of doctorally-prepared underrepresented minority (URM) scientists/faculty. We describe a five-year University of Illinois at Chicago (UIC) Bridges program for URM master's students' transition to doctoral study and factors in retention/graduation from the PhD program. Four master' students from two partner schools were recruited/appointed per year and assigned UIC faculty advisors. They completed 10 UIC credits during master's study and were mentored by Bridges faculty. Administrative and financial support was provided during transition and doctoral study. Partner schools' faculty formed research dyads with UIC faculty. Seventeen Bridges students were appointed to the Bridges program: 12 were admitted to the UIC PhD program since 2004 and one graduated in 2007. Eight Bridges faculty research dyads published 5 articles and submitted 1 NIH R03 application. Mentored transition from master's through doctoral program completion and administrative/financial support for students were key factors in program success. Faculty research dyads enhanced the research climate in partner schools.
Damage assessment of bridge infrastructure subjected to flood-related hazards
NASA Astrophysics Data System (ADS)
Michalis, Panagiotis; Cahill, Paul; Bekić, Damir; Kerin, Igor; Pakrashi, Vikram; Lapthorne, John; Morais, João Gonçalo Martins Paulo; McKeogh, Eamon
2017-04-01
Transportation assets represent a critical component of society's infrastructure systems. Flood-related hazards are considered one of the main climate change impacts on highway and railway infrastructure, threatening the security and functionality of transportation systems. Of such hazards, flood-induced scour is a primarily cause of bridge collapses worldwide and one of the most complex and challenging water flow and erosion phenomena, leading to structural instability and ultimately catastrophic failures. Evaluation of scour risk under severe flood events is a particularly challenging issue considering that depth of foundations is very difficult to evaluate in water environment. The continual inspection, assessment and maintenance of bridges and other hydraulic structures under extreme flood events requires a multidisciplinary approach, including knowledge and expertise of hydraulics, hydrology, structural engineering, geotechnics and infrastructure management. The large number of bridges under a single management unit also highlights the need for efficient management, information sharing and self-informing systems to provide reliable, cost-effective flood and scour risk management. The "Intelligent Bridge Assessment Maintenance and Management System" (BRIDGE SMS) is an EU/FP7 funded project which aims to couple state-of-the art scientific expertise in multidisciplinary engineering sectors with industrial knowledge in infrastructure management. This involves the application of integrated low-cost structural health monitoring systems to provide real-time information towards the development of an intelligent decision support tool and a web-based platform to assess and efficiently manage bridge assets. This study documents the technological experience and presents results obtained from the application of sensing systems focusing on the damage assessment of water-hazards at bridges over watercourses in Ireland. The applied instrumentation is interfaced with an open-source platform that can offer a more economical remote monitoring solution. The results presented in this investigation provide an important guide for a multidisciplinary approach to bridge monitoring and can be used as a benchmark for the field application of cost-effective and robust sensing methods. This will deliver key information regarding the impact of water-related hazards at bridge structures through an integrated structural health monitoring and management system. Acknowledgement: The authors wish to acknowledge the financial support of the European Commission, through the Marie Curie action Industry-Academia Partnership and Pathways Network BRIDGE SMS (Intelligent Bridge Assessment Maintenance and Management System) - FP7-People-2013-IAPP- 612517.
77 FR 54652 - Draft Program Comment for Common Post-1945 Concrete and Steel Bridges
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-05
... Program Comment for Common Post-1945 Concrete and Steel Bridges AGENCIES: Federal Highway Administration... Bridges; request for comments. SUMMARY: The Advisory Council on Historic Preservation (ACHP) is... to the effects of undertakings on common post-1945 concrete and steel bridges. The FHWA is requesting...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 31 2011-07-01 2011-07-01 false Accreditation of training programs: public and commercial buildings, bridges and superstructures. [Reserved] 745.228 Section 745.228... Accreditation of training programs: public and commercial buildings, bridges and superstructures. [Reserved] ...
Developmental Summer Bridge Programs. What Works Clearinghouse™ Intervention Report
ERIC Educational Resources Information Center
What Works Clearinghouse, 2015
2015-01-01
Developmental summer bridge programs are designed to reduce the need for developmental education in college by providing students with accelerated instruction in areas where additional knowledge and skills are needed to help them succeed in higher education. The WWC identified one study of developmental summer bridge programs that meets WWC…
Summer Bridge Programs. What Works Clearinghouse Intervention Report
ERIC Educational Resources Information Center
What Works Clearinghouse, 2016
2016-01-01
"Summer bridge programs" are designed to ease the transition to college and support postsecondary success by providing students with the academic skills and social resources needed to succeed in a college environment. These programs occur in the summer "bridge" period between high school and college. Although the content of…
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Accreditation of training programs: public and commercial buildings, bridges and superstructures. [Reserved] 745.228 Section 745.228... Accreditation of training programs: public and commercial buildings, bridges and superstructures. [Reserved] ...
77 FR 34215 - Special Local Regulations for Marine Events, Swim Event; Lake Gaston, Littleton, NC
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-11
... material to the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone (202) 366-9826... along the western side of Eaton Ferry Bridge to the Waterview Restaurant. A fleet of spectator vessels... operation of any support vessel participating in the event, at any time it is deemed necessary for the...
Bridging race and gender divides in forest recreation
John Houghton; Michael Schnell; Christine Thomas; Diane Lueck
2003-01-01
Today, state and federal resource management agencies struggle with the need to build constituent bases among the growing minority populations. In light of that fact, the Becoming an Outdoors-Woman (BOW)® program did a two-year study to look at ways to involve more minority women in its workshops. A national conference was held to examine barriers to...
75 FR 38411 - Drawbridge Operation Regulations; Charles River, Boston, MA, Public Event
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-02
... interests and no objections have been received in past years. The owner of the bridge, the Massachusetts... holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, call or e-mail Mr. John W.... If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations...
Ribbon-cutting officially opens Consolidated Support Operations Center at CCAS
NASA Technical Reports Server (NTRS)
1999-01-01
Cutting the ribbon at a ceremony for the opening of the Consolidated Support Operations Center at ROCC, Cape Canaveral Air Station, are (left to right) William P. Hickman, program manager, Space Gateway Support; Ed Gormel, executive director, JPMO; Barbara White, supervisor, Mission Support; KSC Center Director Roy Bridges, and Lt Col Steve Vuresky, USAF.
1998-12-18
Federal, state, NASA, KSC and Space Florida Authority (SFA) officials dig in at the planned site of a multi-purpose hangar, phase one of the Reusable Launch Vehicle (RLV) Support Complex to be built near the Shuttle Landing Facility. From left, they are a representative from Rush Construction; Ed O'Connor, executive director of the Spaceport Florida Authority (SFA); Stephen T. Black, Lockheed Martin technical operations program manager; Warren Wiley, deputy director of engineering development; Tom Best, district director, representing U.S. Congressman Dave Weldon; Roy Bridges, director, Kennedy Space Center; Bill Posey, 32nd district representative; Randy Ball, state representative; Charlie Bronson, state senator; Donald McMonagle, manager of launch integration; and John London, Marshall Space Flight Center X-34 program manager. The new complex is jointly funded by SFA, NASA's Space Shuttle Program and Kennedy Space Center. It is intended to support the Space Shuttle and other RLV and X-vehicle systems. Completion is expected by the year 2000
A Bridge to a Smart Start: A Case Study of Northampton Community College's Summer Bridge Program
ERIC Educational Resources Information Center
Sparrow, Michael J.
2017-01-01
This study sought to understand how and why Northampton Community College's Summer Bridge program--The Smart Start program--is highly successful at helping "at-risk" students transition to college-level work. For ten years, the Smart Start program has helped more than 150 incoming students acclimate to college, persist, and graduate…
Bridging the Gap: An Impact Study of Eight Developmental Summer Bridge Programs in Texas. NCPR Brief
ERIC Educational Resources Information Center
Barnett, Elisabeth A.; Bork, Rachel Hare; Mayer, Alexander K.; Pretlow, Joshua; Wathington, Heather D.; Weiss, Madeline Joy
2012-01-01
Across the country, a growing number of recent high school graduates are participating in summer bridge programs. These programs provide accelerated and focused learning opportunities in order to help students acquire the knowledge and skills needed for college success. The state of Texas has given particular attention to summer programs as a way…
Investigation of mechanistic deterioration modeling for bridge design and management.
DOT National Transportation Integrated Search
2017-04-01
The ongoing deterioration of highway bridges in Colorado dictates that an effective method for allocating limited management resources be developed. In order to predict bridge deterioration in advance, mechanistic models that analyze the physical pro...
1988-04-01
Engineering Educa- -Zhejiang Provincial Society of tion College Mechanical Engineering - Bejing Institute of Technology -Zhejiang Commission, China ...17,445 50 50 ( China Lake), and the Air Force Cam- 1970 16,316 52 48 bridge Research Laboratory. 1975 14,537 51 49 1980 16,542 50 50 The FFRDCs basically...Army ( Opera - Brassey’s International Defense tions Research). She holds a B.A. Gains Publishers, 1984), p. 9. degree in mathematics from the Col
Characterization of bridge foundations workshop report.
DOT National Transportation Integrated Search
2013-11-01
"In 2013, the Federal Highway Administration proposed a new research program for the characterization of bridge foundations. To narrow the focus and develop a research roadmap for the program, a workshop on Characterization of Bridge Foundations...
Characterization of bridge foundations workshop report.
DOT National Transportation Integrated Search
2013-11-01
In 2013, the Federal Highway Administration proposed a new research program for the characterization of bridge : foundations. To narrow the focus and develop a research roadmap for the program, a workshop on : Characterization of Bridge Foundation...
Evaluation of Virginia's first heated bridge.
DOT National Transportation Integrated Search
2000-12-01
This study is a contribution to the Heated Bridge Technology Program established in 1991 under the Intermodal Surface Transportation Efficiency Act. The goal of the program was to find durable and environmentally friendly heated bridge technologies f...
Bridge response due to temperature variations.
DOT National Transportation Integrated Search
2014-05-01
In order to more accurately quantify the behavior and degradation of bridges throughout their service life, the : Federal Highway Administration lunched the Long-Term Bridge Performance Program. As part of this program : an I-girder, integral abutmen...
Code of Federal Regulations, 2010 CFR
2010-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.401 Purpose. The... Bridge Replacement and Rehabilitation Program in accordance with 23 U.S.C. 144. ...
Evaluation of a Summer Bridge: Critical Component of the Leadership 2.0 Program.
Pritchard, Tracy J; Perazzo, Joseph D; Holt, Julie A; Fishback, Benjamin P; McLaughlin, Michaela; Bankston, Karen D; Glazer, Greer
2016-04-01
Summer bridges facilitate the transition from high school to college. Although many schools employ summer bridges, few have published outcomes. This article's purpose is to share preconceptions of college by underrepresented and disadvantaged nursing students and describe important elements and long-term impact of a summer bridge, a component of the Leadership 2.0 program. A longitudinal study design was used to collect baseline, short-term, and long-term post-summer bridge data. Methods included pre- and postsurveys, interviews, and focus groups. After bridge completion, students felt more prepared for the nursing program. Students ranked socialization components as most important. The summer bridge had lasting impact through the first year, where grade point average and retention of underrepresented and disadvantaged bridge students was comparable to the majority first-year students. The summer bridge was effective in preparing nursing students for the first year of college. Through holistic evaluation, unique aspects of socialization critical to student success were uncovered. Copyright 2016, SLACK Incorporated.
A Bridge Program's Effect on Non-College Ready Student Veterans
ERIC Educational Resources Information Center
Morris, Brett Eugene
2013-01-01
This study examined whether a bridge program designed to remediate academic deficiencies for a cohort of student veterans has any bearing on their post-secondary success and persistence. Specifically, this study examined the Veterans Bridge to College Success (VBCS) pilot program at Eastern Kentucky University, which provides an admission pathway…
Cooper, Katelyn M; Ashley, Michael; Brownell, Sara E
2017-01-01
National calls to improve student academic success in college have sparked the development of bridge programs designed to help students transition from high school to college. We designed a 2-week Summer Bridge program that taught introductory biology content in an active-learning way. Through a set of exploratory interviews, we unexpectedly identified that Bridge students had developed sophisticated views of active learning, even though this was not an explicit goal of the program. We conducted an additional set of semistructured interviews that focused on active learning and compared the interviews of Bridge students with those from non-Bridge students who had been eligible for but did not participate in the program. We used the constant comparative method to identify themes from the interviews. We found that Bridge students perceived that, because they knew how to approach active learning and viewed it as important, they benefited more from active learning in introductory biology than non-Bridge students. Specifically, Bridge students seemed to be more aware of their own learning gains from participating in active learning. Compared with the majority of non-Bridge students, the majority of Bridge students described using a greater variety of strategies to maximize their experiences in active learning. Finally, in contrast to non-Bridge students, Bridge students indicated that they take an equitable approach to group work. These findings suggest that we may be able to prime students to maximize their own and other's experiences in active learning. © 2017 K. M. Cooper et al. CBE—Life Sciences Education © 2017 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).
Enhancing Diversity in Physics: The Fisk-Vanderbilt Masters-to-PhD Bridge Program
NASA Astrophysics Data System (ADS)
Stassun, Keivan
2010-03-01
We describe the Fisk-Vanderbilt Masters-to-PhD Bridge program as a model for partnering with minority-serving institutions to increase the representation of women and minorities earning PhDs in astronomy and related disciplines. Since its inception in 2004, the Fisk-Vanderbilt Bridge program has attracted 30 minority students, 60% of whom are female, and with a retention rate of 94%. When the first Bridge students completed their PhDs in 2010-11, the program will become the top awarder of astronomy PhDs to underrepresented minorities in the United States. Already, Fisk has become the top producer of physics Masters degrees to African Americans. We summarize the program's structure, approach, and research basis with the goal of providing a replicable model for other institutions seeking to build similar collaborative, research-based bridging partnerships.
Bridge inspection / washing program : bridge drainage program
DOT National Transportation Integrated Search
2002-02-01
The Rhode Island Department of Transportation, Operations Division is responsible for operation and maintenance of roads and bridges, and construction of highway and multi-modal projects to improve the transportation system of our state. One of the m...
DOT National Transportation Integrated Search
2013-11-01
Scour is the removal of soils in the vicinity of bridge foundations, resulting in a reduced capacity of the foundations, which can increase the risk of bridge : failure. To minimize bridge failure, the Federal Highway Administration (FHWA) has establ...
DOT National Transportation Integrated Search
2013-11-01
Scour is the removal of soils in the vicinity of bridge foundations, resulting in a reduced capacity of the foundations, which can increase the risk of bridge failure. To minimize bridge failure, the Federal Highway Administration (FHWA) has establis...
Instrumentation of the Red River Bridge at Boyce, Louisiana : final report.
DOT National Transportation Integrated Search
1991-01-01
The report describes the instrumentation program of Red River Bridge at Boyce, Louisiana. The objectives of the program were to measure and evaluate time-dependent deformations, deflections, and temperatures of the Red River Bridge superstructure. To...
Instrumentation of the Red River Bridge at Boyce, Louisiana : final report.
DOT National Transportation Integrated Search
1988-08-01
The report describes the instrumentation program of Red River Bridge at Boyce, Louisiana. The objectives of the program were to measure and evaluate time-dependent deformations, deflections, and temperatures of the Red River Bridge superstructure. To...
49 CFR 237.109 - Bridge inspection records.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Bridge inspection records. 237.109 Section 237.109..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.109 Bridge inspection records... performed on those bridges under this part. (b) Each record of an inspection under the bridge management...
49 CFR 237.109 - Bridge inspection records.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Bridge inspection records. 237.109 Section 237.109..., DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.109 Bridge inspection records... performed on those bridges under this part. (b) Each record of an inspection under the bridge management...
Chen, Bin; Wang, Xu; Sun, Dezhang; Xie, Xu
2014-01-01
It is essential to construct structural health monitoring systems for large important bridges. Zhijiang Bridge is a cable-stayed bridge that was built recently over the Hangzhou Qiantang River (the largest river in Zhejiang Province). The length of Zhijiang Bridge is 478 m, which comprises an arched twin-tower space and a twin-cable plane structure. As an example, the present study describes the integrated system of structural health monitoring and intelligent management for Zhijiang Bridge, which comprises an information acquisition system, data management system, evaluation and decision-making system, and application service system. The monitoring components include the working environment of the bridge and various factors that affect bridge safety, such as the stress and strain of the main bridge structure, vibration, cable force, temperature, and wind speed. In addition, the integrated system includes a forecasting and decision-making module for real-time online evaluation, which provides warnings and makes decisions based on the monitoring information. From this, the monitoring information, evaluation results, maintenance decisions, and warning information can be input simultaneously into the bridge monitoring center and traffic emergency center to share the monitoring data, thereby facilitating evaluations and decision making using the system. PMID:25140342
Chen, Bin; Wang, Xu; Sun, Dezhang; Xie, Xu
2014-01-01
It is essential to construct structural health monitoring systems for large important bridges. Zhijiang Bridge is a cable-stayed bridge that was built recently over the Hangzhou Qiantang River (the largest river in Zhejiang Province). The length of Zhijiang Bridge is 478 m, which comprises an arched twin-tower space and a twin-cable plane structure. As an example, the present study describes the integrated system of structural health monitoring and intelligent management for Zhijiang Bridge, which comprises an information acquisition system, data management system, evaluation and decision-making system, and application service system. The monitoring components include the working environment of the bridge and various factors that affect bridge safety, such as the stress and strain of the main bridge structure, vibration, cable force, temperature, and wind speed. In addition, the integrated system includes a forecasting and decision-making module for real-time online evaluation, which provides warnings and makes decisions based on the monitoring information. From this, the monitoring information, evaluation results, maintenance decisions, and warning information can be input simultaneously into the bridge monitoring center and traffic emergency center to share the monitoring data, thereby facilitating evaluations and decision making using the system.
75 FR 54026 - Safety Zone; Red Bull Flugtag, Delaware River, Camden, NJ
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-03
... Franklin Bridge. The safety zone will restrict vessel traffic from a portion of the Delaware River [email protected] . If you have questions on viewing the docket, call Renee V. Wright, Program Manager... from vessels and vessels from any debris in the water as a result from the event. Under 5 U.S.C. 553(d...
DOT National Transportation Integrated Search
1998-01-01
VDOT is implementing Pontis 3.0 to provide the analytical component of its Bridge Management System (BMS). This system prioritizes bridge maintenance, repair, rehabilitation, and replacement (MRR & R) needs using cost/benefit analysis. The accuracy o...
23 CFR 970.210 - Federal lands bridge management system (BMS).
Code of Federal Regulations, 2013 CFR
2013-04-01
... HIGHWAYS NATIONAL PARK SERVICE MANAGEMENT SYSTEMS National Park Service Management Systems § 970.210... National Bridge Inspection Standards (23 CFR part 650, subpart C); (ii) Data characterizing the severity...
23 CFR 970.210 - Federal lands bridge management system (BMS).
Code of Federal Regulations, 2012 CFR
2012-04-01
... HIGHWAYS NATIONAL PARK SERVICE MANAGEMENT SYSTEMS National Park Service Management Systems § 970.210... National Bridge Inspection Standards (23 CFR part 650, subpart C); (ii) Data characterizing the severity...
23 CFR 970.210 - Federal lands bridge management system (BMS).
Code of Federal Regulations, 2011 CFR
2011-04-01
... HIGHWAYS NATIONAL PARK SERVICE MANAGEMENT SYSTEMS National Park Service Management Systems § 970.210... National Bridge Inspection Standards (23 CFR part 650, subpart C); (ii) Data characterizing the severity...
Henneberg, M.F.; Strause, J.L.
2002-01-01
This report presents the instructions required to use the Scour Critical Bridge Indicator (SCBI) Code and Scour Assessment Rating (SAR) calculator developed by the Pennsylvania Department of Transportation (PennDOT) and the U.S. Geological Survey to identify Pennsylvania bridges with excessive scour conditions or a high potential for scour. Use of the calculator will enable PennDOT bridge personnel to quickly calculate these scour indices if site conditions change, new bridges are constructed, or new information needs to be included. Both indices are calculated for a bridge simultaneously because they must be used together to be interpreted accurately. The SCBI Code and SAR calculator program is run by a World Wide Web browser from a remote computer. The user can 1) add additional scenarios for bridges in the SCBI Code and SAR calculator database or 2) enter data for new bridges and run the program to calculate the SCBI Code and calculate the SAR. The calculator program allows the user to print the results and to save multiple scenarios for a bridge.
CAMPARE and Cal-Bridge: Two Institutional Networks Increasing Diversity in Astronomy
NASA Astrophysics Data System (ADS)
Rudolph, Alexander L.; Smecker-Hane, Tammy A.
2017-01-01
We describe two programs, CAMPARE and Cal-Bridge, with the common mission of increasing participation of groups traditionally underrepresented in astronomy, through summer research opportunities, in the case of CAMPARE, scholarships in the case of Cal-Bridge, and significant mentoring in both programs, creating a national impact on their numbers successfully pursuing a PhD in the field.In 7 years, the CAMPARE program has sent 80 students, >80% from underrepresented groups, to conduct summer research at one of 14 major research institutions throughout the country. The graduation rate among CAMPARE scholars is 98%, and of the CAMPARE scholars who have graduated with a Bachelor’s degree, more than 60% have completed or are pursuing graduate education in astronomy or a related field, at institutions including UCLA, UC Riverside, UC Irvine, UC Santa Barbara, USC, Stanford, Univ. of Arizona, Univ. of Washington, and the Fisk-Vanderbilt Master’s-to-PhD program.Now entering its third year, the Cal-Bridge program is a CSU-UC Bridge program comprised of over 75 physics and astronomy faculty from 5 University of California (UC), 9 California State University (CSU), and 14 California Community College (CCC) campuses in Southern California. In the first three years, 22 Cal-Bridge Scholars have been selected, including 11 Hispanic, 3 African-American and 8 female students, 5 of whom are from URM groups. Nineteen (19) of the 22 Cal-Bridge Scholars are first-generation college students. The entire first cohort of 4 Cal-Bridge scholars was accepted to one or more PhD programs in astronomy or physics, including UC Irvine, UC Santa Cruz, UC Davis, Michigan State, and Georgia State Universities. The second cohort of 8 Cal-Bridge scholars is applying to graduate schools this fall.Cal-Bridge provides much deeper mentoring and professional development experiences over the last two years of undergraduate and first year of graduate school to students from this diverse network of higher education institutions. Cal-Bridge Scholars benefit from substantial financial support, intensive, joint mentoring by CSU and UC faculty, professional development workshops, and exposure to research opportunities at the participating UC campuses.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false How will a bridge project be programmed for funding once eligibility has been determined? 661.23 Section 661.23 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false How will a bridge project be programmed for funding once eligibility has been determined? 661.23 Section 661.23 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false How will a bridge project be programmed for funding once eligibility has been determined? 661.23 Section 661.23 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a...
ERIC Educational Resources Information Center
Medina, Mary Christine
2016-01-01
The purpose of this study was to determine the impact of a summer bridge program geared toward first-year students at a large public university located in the Southeastern United States. The research question guiding this study was, "Does participation in a summer bridge program increase academic success for first-year college students?"…
31. U.S. WORKS PROGRAM GRADE CROSSING PROJECT, (TITLE PAGE) W.P.G.M. ...
31. U.S. WORKS PROGRAM GRADE CROSSING PROJECT, (TITLE PAGE) W.P.G.M. NO-301, WEST BRIDGE STREET. Sheet 1 of 10 - Notre Dame Bridge, Spanning Merrimack River on Bridge Street, Manchester, Hillsborough County, NH
In-service performance monitoring of a CFRP reinforced HPC bridge deck.
DOT National Transportation Integrated Search
2010-08-01
The Rollins Road Bridge in Rollinsford, New Hampshire was constructed in part with funding from the FHWAs Innovative Bridge Research and Construction (IBRC) program and opened to traffic in December, 2000. A requirement of the IBRC program is the ...
23 CFR 650.409 - Evaluation of bridge inventory.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Evaluation of bridge inventory. 650.409 Section 650.409... BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.409 Evaluation of bridge inventory. (a) Sufficiency rating of bridges. Upon receipt and evaluation of the bridge...
23 CFR 650.409 - Evaluation of bridge inventory.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Evaluation of bridge inventory. 650.409 Section 650.409... BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.409 Evaluation of bridge inventory. (a) Sufficiency rating of bridges. Upon receipt and evaluation of the bridge...
Cal-Bridge and CAMPARE: Engaging Underrepresented Students in Physics and Astronomy
NASA Astrophysics Data System (ADS)
Rudolph, Alexander L.; Cal-Bridge and CAMPARE Teams
2018-01-01
We describe two programs, Cal-Bridge and CAMPARE, with the common mission of increasing participation of groups traditionally underrepresented in astronomy, through summer research opportunities, in the case of CAMPARE, scholarships in the case of Cal-Bridge, and significant mentoring in both programs, creating a national impact on their numbers successfully pursuing a PhD in the field.In 8 years, the CAMPARE program has sent 112 students, >80% from underrepresented groups, to conduct summer research at one of 14 major research institutions throughout the country. Of the CAMPARE scholars who have graduated with a Bachelor’s degree, almost two-thirds (65%) have completed or are pursuing graduate education in physics, astronomy, or a related field, at institutions including UCLA, UC Riverside, UC Irvine, UC Santa Barbara, USC, Stanford, Univ. of Arizona, Univ. of Washington, Univ. of Rochester, Michigan State Univ., Georgia Tech, Georgia State Univ., Kent State, Indiana Univ., Univ. of Oregon, Syracuse Univ., Montana State Univ., and the Fisk-Vanderbilt Master’s-to-PhD program.Now entering its fourth year, the Cal-Bridge program is a CSU-UC Bridge program comprised of >140 physics and astronomy faculty from 9 University of California (UC), 15 California State University (CSU), and 30 California Community College (CCC) campuses throughout California. In the first four years, 34 Cal-Bridge Scholars have been selected, including 22 Hispanic, 3 African-American and 13 women students, 10 of whom are from URM groups. Thirty (30) of the 34 Cal-Bridge Scholars are first generation college students. In the last two years, 11 of 13 Cal-Bridge Scholars have begun PhD programs in physics or astronomy at top PhD programs nationally. Three (3) of these 11 scholars have won NSF Graduate Research Fellowships; one more received an Honorable Mention. The next cohort applies this fall.Cal-Bridge provides much deeper mentoring and professional development experiences over the last two years of undergraduate and first year of graduate school to students from this diverse network of higher education institutions. Cal-Bridge Scholars benefit from substantial financial support, intensive, joint mentoring by CSU and UC faculty, professional development workshops, and exposure to research opportunities at the participating UC campuses.
Code of Federal Regulations, 2010 CFR
2010-04-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT MANAGEMENT AND MONITORING SYSTEMS Management Systems § 500.107 BMS. An effective BMS for bridges on and off Federal-aid highways that should be based on the “AASHTO Guidelines for Bridge Management Systems” 2 and that supplies...
Petrotac bridge deck waterproofing membrane on Five Mile Creek Bridge : first interim report.
DOT National Transportation Integrated Search
1986-09-01
During the 1970's, the Oregon State Highway Division was involved in a Federally funded experimental program to evaluate various waterproofing membrane systems for bridge decks. Through this program, a list of approved products and/or systems was dev...
Cal-Bridge and CAMPARE: Engaging Underrepresented Students in Physics and Astronomy
NASA Astrophysics Data System (ADS)
Rudolph, Alexander L.; Smecker-Hane, Tammy A.; Cal-Bridge Team; CAMPARE Team
2018-06-01
We describe two programs, Cal-Bridge and CAMPARE, with the common mission of increasing participation of groups traditionally underrepresented in astronomy, through summer research opportunities, in the case of CAMPARE, scholarships in the case of Cal-Bridge, and significant mentoring in both programs, creating a national impact on their numbers successfully pursuing a PhD in the field. In 9 years, the CAMPARE program has sent 150 students, >80% from underrepresented groups, to conduct summer research at one of 14 major research institutions throughout the country. Of the CAMPARE scholars who have graduated with a Bachelor’s degree, almost two-thirds (65%) have completed or are pursuing graduate education in physics, astronomy, or a related field, at institutions including UCLA, UC Riverside, UC Irvine, UC Santa Barbara, USC, Stanford, Univ. of Arizona, Univ. of Washington, Univ. of Rochester, Michigan State Univ., Georgia Tech, Georgia State Univ., Kent State, Indiana Univ., Univ. of Oregon, Syracuse Univ., Montana State Univ., and the Fisk- Vanderbilt Master’s-to-PhD program. Now in its fourth year, the Cal-Bridge program is a CSU-UC Bridge program comprised of physics and astronomy faculty from 9 University of California (UC), 15 California State University (CSU), and more than 30 California Community College (CCC) campuses throughout California. In the first four years, 34 Cal-Bridge Scholars have been selected, including 22 Hispanic, 3 African-American and 13 women students, 10 of whom are from URM groups. Thirty (30) of the 34 Cal-Bridge Scholars are first generation college students. In the last three years, 17 of 21 Cal-Bridge Scholars have begun or been accepted PhD programs in physics or astronomy at top PhD programs nationally. Three (3) of these scholars have won NSF Graduate Research Fellowships; one more received an Honorable Mention. Once selected, Cal-Bridge Scholars benefit from substantial financial support, intensive, joint mentoring by CSU and UC faculty, professional development workshops, and exposure to research opportunities at the participating UC campuses. Funding for this program is provided by NSF-DUE SSTEM Grant #1356133.
VanTrump, G.; Miesch, A.T.
1977-01-01
RASS is an acronym for Rock Analysis Storage System and STATPAC, for Statistical Package. The RASS and STATPAC computer programs are integrated into the RASS-STATPAC system for the management and statistical reduction of geochemical data. The system, in its present form, has been in use for more than 9 yr by scores of U.S. Geological Survey geologists, geochemists, and other scientists engaged in a broad range of geologic and geochemical investigations. The principal advantage of the system is the flexibility afforded the user both in data searches and retrievals and in the manner of statistical treatment of data. The statistical programs provide for most types of statistical reduction normally used in geochemistry and petrology, but also contain bridges to other program systems for statistical processing and automatic plotting. ?? 1977.
Hardwoods for timber bridges : a national program emphasis by the USDA Forest Service
James P. Wacker; Ed Cesa
2005-01-01
This paper describes the joint efforts of the Forest Service and the FHWA to administer national programs including research, demonstration bridges, and technology transfer components. Summary information on a number of Forest Service-WIT demonstration bridges constructed with hardwoods is also provided.
Actionable Science in the Gulf of Mexico: Connecting Researchers and Resource Managers
NASA Astrophysics Data System (ADS)
Lartigue, J.; Parker, F.; Allee, R.; Young, C.
2017-12-01
The National Oceanic and Atmospheric Administration (NOAA) RESTORE Science Program was established in the wake of the Deepwater Horizon oil spill to to carry out research, observation, and monitoring to support the long-term sustainability of the Gulf of Mexico ecosystem, including its fisheries. Administered in partnership with the US Fish and Wildlife Service, the Science Program emphasizes a connection between science and decision-making. This emphasis translated into an engagement process that allowed for resource managers and other users of information about the ecosystem to provide direct input into the science plan for the program. In developing funding opportunities, the Science Program uses structured conversations with resource managers and other decision makers to focus competitions on specific end user needs. When evaluating proposals for funding, the Science Program uses criteria that focus on applicability of a project's findings and products, end user involvement in project planning, and the approach for transferring findings and products to the end user. By including resource managers alongside scientific experts on its review panels, the Science Program ensures that these criteria are assessed from both the researcher and end user perspectives. Once funding decisions are made, the Science Program assigns a technical monitor to each award to assist with identifying and engaging end users. Sharing of best practices among the technical monitors has provided the Science Program insight on how best to bridge the gap between research and resource management and how to build successful scientist-decision maker partnerships. During the presentation, we will share two case studies: 1) design of a cooperative (fisheries scientist, fisheries managers, and fishers), Gulf-wide conservation and monitoring program for fish spawning aggregations and 2) development of habitat-specific ecosystem indicators for use by federal and state resource managers.
Hodgkins, Glenn A.; Norris, J. Michael; Lent, Robert M.
2014-01-01
Long-term streamflow information is critical for use in several water-related areas that are important to humans and wildlife, including water management, computation of flood and drought flows for water infrastructure, and analysis of climate-related trends. Specific uses are many and diverse and range from informing water rights across state and international boundaries to designing dams and bridges.
ERIC Educational Resources Information Center
Pearson, Cecil A. L.; Chatterjee, Samir Ranjan
2010-01-01
It is widely accepted that the concepts and practices of management can only be of benefit when they are anchored to the contextual architecture of people, processes, structures, and technologies. The challenge of establishing a bridging program for providing managerial competencies to Australian Indigenous people has become a serious one for…
Developing deterioration models for Nebraska bridges.
DOT National Transportation Integrated Search
2011-07-01
Nebraska Bridge Management System (NBMS) was developed in 1999 to assist in optimizing budget allocation for : the maintenance, rehabilitation and replacement needs of highway bridges. This requires the prediction of bridge : deterioration to calcula...
25 CFR 170.507 - Who reviews bridge inspection reports?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Who reviews bridge inspection reports? 170.507 Section 170.507 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Bridge...
ERIC Educational Resources Information Center
Bitterlin, Gretchen
This three-part report describes the Bridging Program at San Diego Mesa College (SDMC), a basic skills program to prepare students functioning at the 7th grade level or below and to thus provide a bridge between developmental education and adult basic education (ABE). Part I begins with a review of the program's background and a list of its…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-24
... Homeowners Loan Program. The program will offer a declining balance, deferred payment ``bridge loan'' (non.... The program will offer a declining balance, deferred payment ``bridge loan'' (non-recourse...
Health management and controls for earth to orbit propulsion systems
NASA Technical Reports Server (NTRS)
Bickford, R. L.
1992-01-01
Fault detection and isolation for advanced rocket engine controllers are discussed focusing on advanced sensing systems and software which significantly improve component failure detection for engine safety and health management. Aerojet's Space Transportation Main Engine controller for the National Launch System is the state of the art in fault tolerant engine avionics. Health management systems provide high levels of automated fault coverage and significantly improve vehicle delivered reliability and lower preflight operations costs. Key technologies, including the sensor data validation algorithms and flight capable spectrometers, have been demonstrated in ground applications and are found to be suitable for bridging programs into flight applications.
CAMPARE and Cal-Bridge: Two Institutional Networks Increasing Diversity in Astronomy
NASA Astrophysics Data System (ADS)
Rudolph, Alexander L.; Impey, Chris David; Smecker-Hane, Tammy A.
2016-01-01
We describe two programs, CAMPARE and Cal-Bridge, with the common mission of increasing participation of groups traditionally underrepresented in astronomy, through summer research opportunities, in the case of CAMPARE, scholarships in the case of Cal-Bridge, and significant mentoring in both programs, leading to an increase in their numbers successfully pursuing a PhD in the field.In 6 years, the CAMPARE program has sent 62 students, >85% from underrepresented groups, to conduct summer research at one of twelve major research institutions in California, Arizona, and Wyoming. The graduation rate among CAMPARE scholars is 97%, and of the 37 CAMPARE scholars who have graduated with a Bachelor's degree, almost 60% (21) have completed or are pursuing graduate education in astronomy or a related field, at institutions including UCLA, USC, UC Riverside, Stanford, Univ. of Rochester, Georgia Tech, Kent State, Indiana Univ., Univ. of Oregon, Syracuse, and the Fisk-Vanderbilt Master's-to-PhD program. The Cal-Bridge program is a CSU-UC Bridge program comprised of faculty form 5 University of California (UC), 8 California State University (CSU), and 8 California Community College (CCC) campuses in Southern California. Cal-Bridge provides much deeper mentoring and professional development experiences over the last two years of undergraduate and first year of graduate school to students from this diverse network of higher education institutions. Cal-Bridge Scholars benefit from financial support, intensive, joint mentoring by CSU and UC faculty, professional development workshops, and exposure to research opportunities at the participating UC campuses.
NASA Technical Reports Server (NTRS)
Childs, Lauren M.; Miller, Joseph E.
2011-01-01
The DEVELOP National Program was established over a decade ago to provide students with experience in the practical application of NASA Earth science research results. As part of NASA's Applied Sciences Program, DEVELOP focuses on bridging the gap between NASA technology and the public through projects that innovatively use NASA Earth science resources to address environmental issues. Cultivating a diverse and dynamic group of students and young professionals, the program conducts applied science research projects during three terms each year (spring, summer, and fall) that focus on topics ranging from water resource management to natural disasters.
Highway bridge inspection : state-of-the-practice survey
DOT National Transportation Integrated Search
2001-04-01
The congressionally mandated National Bridge Inspection program requires States to periodically inventory, inspect, and rate all highway bridges on public roads. The National Bridge Inspection Standards, implemented in 1971, prescribe minimum require...
25 CFR 170.506 - What are the minimum qualifications for certified bridge inspectors?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false What are the minimum qualifications for certified bridge... Program Facilities Bridge Inspection § 170.506 What are the minimum qualifications for certified bridge inspectors? The person responsible for the bridge inspection team must meet the qualifications for bridge...
Crossing the Divide: An Emerging Typology of Postsecondary Bridging for Opportunity Youth
ERIC Educational Resources Information Center
Almeida, Cheryl; Allen, Lili
2016-01-01
Through Job For the Future's (JFF's) work with communities around the country on the Back on Track model, postsecondary bridging strategies have emerged as a particularly critical and especially replicable component of programming for vulnerable youth. This issue brief offers a typology of evidence-informed bridge programming, drawing on…
California State University Long Beach: Model for a Terminal Master's Program as a Bridge to PhD
NASA Astrophysics Data System (ADS)
Bill, Andreas; Kenealy, Patrick; Kwon, Chuhee; Papp, Zoltan; Pickett, Galen T.
The department of Physics & Astronomy at California State University Long Beach has redesigned its Master's program in 2008 with the goal to provide a true graduate experience in Physics. The hallmarks of the program are five core graduate courses and a research-based MS thesis. During the last five years, 42% of MS recipients (24 students) were accepted to PhD programs, 41% started private-sector STEM careers, and 17% decided on teaching and other paths. The program doubled in size during that period. In 2013 we also became one of six Bridge Sites and only non-PhD granting institution of the American Physical Society (APS). We will describe the structure of the MS program, its goals and its place in the University degree plan landscape. We will also discuss how the APS Bridge Program has been implemented in our institution and has influenced our MS program. We gratefully acknowledge support from a variety of sources that contributed to establish the MS program, including the APS Bridge Program, individual NSF and Army Research Laboratory Grants.
23 CFR 650.407 - Application for bridge replacement or rehabilitation.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Application for bridge replacement or rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.407 Application for bridge replacement or rehabilitation. (a) Agencies participate...
23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Procedures for bridge replacement and rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration...
23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Procedures for bridge replacement and rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration...
23 CFR 650.407 - Application for bridge replacement or rehabilitation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Application for bridge replacement or rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.407 Application for bridge replacement or rehabilitation. (a) Agencies participate...
KSC Center Director Bridges accepts an ISO 9001 certificate from DNV
NASA Technical Reports Server (NTRS)
1998-01-01
Center Director Roy Bridges displays the ISO 9001 certificate he was awarded by Det Norske Veritas (DNV), Inc., an international ISO certification organization, at a ceremony at KSC. Dalton Lyon of DNV made the presentation, which included a 2000th ISO Certificate Plaque. ISO 9001 comprises the most detailed, comprehensive set of standard requirements for quality programs established by the International Standards Organization. The presentation followed a successful independent audit by DNV of the KSC Management System in May of this year. The third-party auditors examined about 20 elements of KSC's system, including management responsibility, design control, documentation, test and inspection, and corrective action procedures. DNV found that KSC met or exceeded the stringent quality standards in all areas. KSC will use this certification as a tool to improve an already world-class team. All NASA centers are required by NASA Administrator Daniel S. Goldin to be ISO 9001 registered by September 1999. NASA is the first federal agency to seek the quality certification.
Final report bridge design system analysis and modernization.
DOT National Transportation Integrated Search
2016-09-27
The Bridge Design System (BDS) is an in-house software program developed by the Michigan Department of Transportations : (MDOT) Bridge Design Unit. The BDS designs bridges according to the required specifications, and outputs corresponding design ...
Analysis of past NBI ratings to determine future bridge preservation needs.
DOT National Transportation Integrated Search
2004-01-01
Bridge Management System (BMS) needs an analytical tool that can predict bridge element deterioration and answer questions related to bridge preservation. PONTIS, a comprehensive BMS software, was developed to serve this purpose. However, the intensi...
DOT National Transportation Integrated Search
2014-06-01
Concrete slab bridges are being examined as part of the MaineDOT Advanced Bridge Safety Initiative. Under Tasks : 1 3 a finite element analysis program is developed, validated and applied to twenty bridges. : Task 4 investigates and develops a no...
76 FR 55160 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-06
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...
77 FR 53251 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-31
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...
75 FR 62181 - Annual Materials Report on New Bridge Construction and Bridge Rehabilitation
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-07
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Annual Materials Report on New Bridge Construction and Bridge Rehabilitation AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable...
Field investigations of historic covered timber bridges in the USA
James Wacker; Travis Hosteng; Brent Phares
2012-01-01
The Federal Highway Administration is sponsoring a comprehensive research program on Historic Covered Timber Bridges in the USA. This national program's main purpose is to develop improved methods to preserve, rehabililate, and restore the timber bridge trusses that were developed during the early 1800s, and in many cases are still in service today. The overall...
DOT National Transportation Integrated Search
2015-11-01
Routine inspection and maintenance records are essential for bridges to function well throughout their intended lifespan. : Although existing bridge management systems are efficient at data storage, it is difficult to conduct comprehensive data : ana...
Field performance of timber bridges. 4, Graves Crossing stress-laminated deck bridge
J. P. Wacker; M. A. Ritter
The Graves Crossing bridge was constructed October 1991 in Antrim County, Michigan, as part of the demonstration timber bridge program sponsored by the USDA Forest Service. The bridge is a two-span continuous, stress-laminated deck superstructure and it is 36-ft long and 26-ft wide. The bridge is one of the first stress-laminated deck bridges to be built of sawn lumber...
Deans' Perceptions of AACSB-Endorsed Post-Doctoral Bridge Programs
ERIC Educational Resources Information Center
Mauldin, Shawn; McManis, Bruce; Breaux, Kevin
2011-01-01
The Association to Advance Collegiate Schools of Business (AACSB) International has endorsed 5 Post-Doctoral Bridge (PDB) to Business Programs. The objective of these programs is to prepare PhDs from other academic programs for teaching and research careers in business. The authors solicited feedback from deans of AACSB-accredited business schools…
Remote bridge scour monitoring : a prioritization and implementation guideline
DOT National Transportation Integrated Search
1999-05-01
Having the largest bridge population in the nation, the state of Texas stands to gain much through the development of bridge scour-monitoring and evaluation practices. Because it has such a large bridge population to manage, the Texas Department of T...
Field testing and structural analysis of Burr arch covered bridges in Pennsylvania
Douglas Rammer; James Wacker; Travis Hosteng; Justin Dahlberg; Yaohua Deng
2016-01-01
The Federal Highway Administration sponsored a comprehensive research program on Historic Covered Timber Bridges in the USA. This national program's main purpose is to develop improved methods to preserve, rehabilitate, and restore timber bridge trusses that were developed during the early 1800s and, in many cases, are still in service today. One of the many...
Systematic Review: Bridging the Gap in RPN-to-RN Transitions.
Suva, Grace; Sager, Shelley; Mina, Elaine Santa; Sinclair, Nancy; Lloyd, Monique; Bajnok, Irmajean; Xiao, Sarah
2015-07-01
To review the evidence examining the influences of successful education and professional role transition for registered practical nurses (RPNs) pursuing a baccalaureate degree in nursing (BScN) and registered nurse (RN) licensure through RPN-to-RN bridging programs. Systematic review of papers published between 1995 and 2014 that evaluated students' education and professional role transitions from RPN to RN. Thirty-nine papers were selected that observed or studied the change or transition in designation from RPN to RN, or its equivalent, through bridging programs and analyzed thematically according to Meleis, Sawyer, Im, Hilfinger Messias, and Schumacher's transition model. Personal, community, and social conditions related to preparation for entry, program enrolment, and postgraduate clinical integration influence successful education and professional role transitions for RPN-to-RN bridging students. Providing key transition supports may enhance the potential for successful student transition into and throughout a bridging program, but further research is necessary to enhance this understanding and to recommend best practices for optimizing students' success. The evidence from this review identifies facilitators and barriers to successful education and professional role transition for RPN-to-RN bridging students, and identifies important considerations for future research. © 2015 Sigma Theta Tau International.
Consistency of the New York State bridge inspection program.
DOT National Transportation Integrated Search
2013-09-01
The New York State Department of Transportation (NYSDOT) maintains an inventory of over 17,000 highway : bridges across the state. As per New York States Uniform Code of Bridge Inspections, all bridges in New York : State are inspected biennially,...
Structural monitoring of Rigolets Pass Bridge : LTRC technical summary report 437.
DOT National Transportation Integrated Search
2009-09-01
The Louisiana Department of Transportation and Development (LADOTD) has been gradually : introducing high performance concrete (HPC) into their bridge construction programs. The : Rigolets Pass Bridge is a 62-span bridge with a total length of 5,489 ...
23 CFR 661.21 - When is a bridge eligible for rehabilitation?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false When is a bridge eligible for rehabilitation? 661.21... TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.21 When is a bridge eligible for rehabilitation? To be eligible for rehabilitation, the bridge must be considered structurally deficient or...
23 CFR 661.47 - Can bridge maintenance be performed with IRRBP funds?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Can bridge maintenance be performed with IRRBP funds... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.47 Can bridge maintenance be performed with IRRBP funds? No. Bridge maintenance repairs, e.g., guard rail repair, deck repairs, repair of...
23 CFR 661.19 - When is a bridge eligible for replacement?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false When is a bridge eligible for replacement? 661.19... TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.19 When is a bridge eligible for replacement? To be eligible for replacement, the bridge must be considered structurally deficient or...
23 CFR 661.47 - Can bridge maintenance be performed with IRRBP funds?
Code of Federal Regulations, 2010 CFR
2010-04-01
... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.47 Can bridge maintenance be performed with IRRBP funds? No. Bridge maintenance repairs, e.g., guard rail repair, deck repairs, repair of... 23 Highways 1 2010-04-01 2010-04-01 false Can bridge maintenance be performed with IRRBP funds...
23 CFR 661.19 - When is a bridge eligible for replacement?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false When is a bridge eligible for replacement? 661.19... TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.19 When is a bridge eligible for replacement? To be eligible for replacement, the bridge must be considered structurally deficient or...
23 CFR 661.21 - When is a bridge eligible for rehabilitation?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false When is a bridge eligible for rehabilitation? 661.21... TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.21 When is a bridge eligible for rehabilitation? To be eligible for rehabilitation, the bridge must be considered structurally deficient or...
Managing Florida's fracture critical bridges - phases 1 and 2 : final report.
DOT National Transportation Integrated Search
2016-05-01
Based on the definition given in the AASHTO LRFD Bridge Design Specifications, twin steel box-girder bridges are : classified as bridges with fracture critical members (FCMs), in which a failure of a tension member is expected to : lead to a collapse...
DOT National Transportation Integrated Search
2013-06-01
This research documents the development and evaluation of artificial neural network (ANN) models to predict the condition ratings of concrete highway bridge decks in Michigan. Historical condition assessments chronicled in the national bridge invento...
Using expert opinion to quantify accuracy and reliability of nondestructive evaluation on bridges.
DOT National Transportation Integrated Search
2015-08-01
Bridge inspection is an important phase in bridge management. In 2009, a joint American Society of Civil : Engineers Structural Engineering Institute and AASHTO Ad-Hoc group was created to identify the issues : in bridge safety and to study current b...
Using intensive case management to reduce violence by mentally ill persons in the community.
Dvoskin, J A; Steadman, H J
1994-07-01
Aggressive and intensive case management and a comprehensive array of community support services are the keys to reducing the risk of violence by people with serious mental illness in the community. The authors describe the elements of intensive case management for potentially violent clients, including use of individual case managers responsible for small caseloads, 24-hour availability of case managers, and strong linkages to agencies providing mental health services, substance abuse treatment, and social services as well as to the criminal justice system. They summarize the results of three recent studies of intensive case management programs suggesting that this intervention is effective in reducing clients' dangerousness in the community. They discuss cultural and human resource issues that affect planning of intensive case management services. Intensive case managers need to be "boundary spanners" with the training, experience, and personality to bridge the often-broad gap between human service and criminal justice systems.
Illinois Shifting Gears Policy Evaluation
ERIC Educational Resources Information Center
Weitzel, Peter C.
2009-01-01
Illinois Shifting Gears is a multilevel initiative that has simultaneously created bridge programs in the field and altered state policy to facilitate the creation of more programs in the future. These efforts have informed each other, giving policymakers the opportunity to interact with practitioners, troubleshoot bridge programs, and make…
ERIC Educational Resources Information Center
Bohnen, Elizabeth; Klie, Judy
This report describes BRIDGES, an employment equity special measures training program developed by the City of Toronto (Ontario, Canada). It was designed to help women employees move from their traditional jobs into trades, technical or operation (TTO) jobs within their own organization. The program is a combination of classroom sessions, shop…
Framework for a comprehensive bridge management and information system.
DOT National Transportation Integrated Search
2011-11-01
"The purpose of this research project was to provide a framework for the development of a Bridge : Management Information System (BMIS). Researchers developed a synthesis of current BMIS development : activities and identified sources of data availab...
Environmental classification scheme for Pontis.
DOT National Transportation Integrated Search
1994-01-01
In an effort to comply with the federal mandate for bridge management systems, many states have chosen to implement an existing system rather than develop their own. One such system is Pontis, the network-level bridge management system developed thro...
Impacts of a Summer Bridge Program in Engineering on Student Retention and Graduation
ERIC Educational Resources Information Center
Cançado, Luciana; Reisel, John R.; Walker, Cindy M.
2018-01-01
A summer bridge program was developed in an engineering program to advance the preparation of incoming freshmen students, particularly with respect to their math course placement. The program was intended to raise the initial math course placement of students who otherwise would begin their engineering studies in courses below Calculus I. One…
1999-06-17
A panel of NASA and contractor senior staff, plus officers from the 45th Space Wing, discuss safetyand health-related concerns in front of an audience of KSC employees, as part of Super Safety and Health Day. Moderating at the podium is Loren Shriver, deputy director for Launch & Payload Processing. Seated left to right are Burt Summerfield, associate director of the Biomedical Office; Colonel William S. Swindling, commander, 45th Medical Group, Patrick Air Force Base, Fla.; Ron Dittemore, manager, Space Shuttle Programs, Johnson Space Center; Roy Bridges, Center Director; Col. Tom Deppe, vice commander, 45th Space Wing, Patrick Air Force Base; Jim Schoefield, program manager, Payload Ground Operations, Boeing; Bill Hickman, program manager, Space Gateway Support; and Ed Adamek, vice president and associate program manager for Ground Operations, United Space Alliance. The panel was one of the presentations during KSC's second annual day-long dedication to safety. Most normal work activities were suspended to allow personnel to attend related activities. The theme, "Safety and Health Go Hand in Hand," emphasized KSC's commitment to place the safety and health of the public, astronauts, employees and space-related resources first and foremost. Events also included a keynote address, vendor exhibits, and safety training in work groups. The keynote address and panel session were also broadcast internally over NASA television
Alkema, Gretchen E; Wilber, Kathleen H; Shannon, George R; Allen, Douglas
2007-08-01
This analysis evaluated mortality over 24 months for Medicare managed care members who participated in the Care Advocate Program (CA Program) designed to link those with high health care utilization to home- and community-based services. Secondary data from the CA Program, part of the California HealthCare Foundation's Elders in Managed Care Initiative. Randomized-control trial in which participants (N=781) were randomly assigned to intent-to-treat (ITT) and control groups. ITT group received telephonic social care management and 12 months of follow-up. Various multivariate analyses were used to evaluate mortality risk throughout multiple study periods controlling for sociodemographic characteristics, health status, and health care utilization. Older adults (65+) enrolled in a Medicare managed care plan who had high health care utilization in the previous year. ITT group had a significantly lower odds of mortality throughout the study (OR=0.55; p=.005) and during the care management intervention (OR=0.45; p=.006), whereas differential risk in the postintervention period was not statistically significant. Other significant predictors of mortality were age, gender, three chronic conditions (cancer, heart disease, and kidney disease), and emergency room utilization. Findings suggest that the care advocate model of social care management affected mortality while the program was in progress, but not after completion of the intervention phase. Key model elements accounted for the findings, which include individualized targeting, assessment, and monitoring; consumer choice, control, and participant self-management; and bridging medical and social service delivery systems through direct linkages and communication.
ERIC Educational Resources Information Center
Tortop, Hasan Said
2013-01-01
All over the world, studies related to design of appropriate educational programs for gifted students have been continuing. It is also important that these programs should be adapted to both realities of countries and developing educational technologies. In Turkey, the structure of The Education Program for the Gifted Students' Bridge with…
DOT National Transportation Integrated Search
2009-12-01
The goals of integration should be: Supporting domain oriented data analysis through the use of : knowledge augmented visual analytics system. In this project, we focus on: : Providing interactive data exploration for bridge managements. : ...
23 CFR 661.55 - How are BIA and Tribal owned IRR bridges inspected?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false How are BIA and Tribal owned IRR bridges inspected? 661... AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.55 How are BIA and Tribal owned IRR bridges inspected? BIA and Tribally owned IRR bridges are inspected in accordance with 25 CFR part...
23 CFR 661.17 - What are the criteria for bridge eligibility?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false What are the criteria for bridge eligibility? 661.17... TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.17 What are the criteria for bridge eligibility? (a) Bridge eligibility requires the following: (1) Have an opening of 20 feet or more; (2) Be...
23 CFR 661.55 - How are BIA and Tribal owned IRR bridges inspected?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false How are BIA and Tribal owned IRR bridges inspected? 661... AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.55 How are BIA and Tribal owned IRR bridges inspected? BIA and Tribally owned IRR bridges are inspected in accordance with 25 CFR part...
23 CFR 661.17 - What are the criteria for bridge eligibility?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false What are the criteria for bridge eligibility? 661.17... TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.17 What are the criteria for bridge eligibility? (a) Bridge eligibility requires the following: (1) Have an opening of 20 feet or more; (2) Be...
Monitoring system of arch bridge for safety network management
NASA Astrophysics Data System (ADS)
Joo, Bong Chul; Yoo, Young Jun; Lee, Chin Hyung; Park, Ki Tae; Hwang, Yoon Koog
2010-03-01
Korea has constructed the safety management network monitoring test systems for the civil infrastructure since 2006 which includes airport structure, irrigation structure, railroad structure, road structure, and underground structure. Bridges among the road structure include the various superstructure types which are Steel box girder bridge, suspension bridge, PSC-box-girder bridge, and arch bridge. This paper shows the process of constructing the real-time monitoring system for the arch bridge and the measured result by the system. The arch type among various superstructure types has not only the structural efficiency but the visual beauty, because the arch type superstructure makes full use of the feature of curve. The main measuring points of arch bridges composited by curved members make a difference to compare with the system of girder bridges composited by straight members. This paper also shows the method to construct the monitoring system that considers the characteristic of the arch bridge. The system now includes strain gauges and thermometers, and it will include various sensor types such as CCTV, accelerometers and so on additionally. For the long term and accuracy monitoring, the latest optical sensors and equipments are applied to the system.
Pilot study of a multidisciplinary gout patient education and monitoring program.
Fields, Theodore R; Rifaat, Adam; Yee, Arthur M F; Ashany, Dalit; Kim, Katherine; Tobin, Matthew; Oliva, Nicole; Fields, Kara; Richey, Monica; Kasturi, Shanthini; Batterman, Adena
2017-04-01
Gout patient self-management knowledge and adherence to treatment regimens are poor. Our objective was to assess the feasibility and acceptability of a multidisciplinary team-based pilot program for the education and monitoring of gout patients. Subjects completed a gout self-management knowledge exam, along with gout flare history and compliance questionnaires, at enrollment and at 6 and 12 months. Each exam was followed by a nursing educational intervention via a structured gout curriculum. Structured monthly follow-up calls from pharmacists emphasized adherence to management programs. Primary outcomes were subject and provider program evaluation questionnaires at 6 and 12 months, program retention rate and success in reaching patients via monthly calls. Overall, 40/45 subjects remained in the study at 12 months. At 12 months, on a scale of 1 (most) to 5 (least), ratings of 3 or better were given by 84.6% of subjects evaluating the usefulness of the overall program in understanding and managing their gout, 81.0% of subjects evaluating the helpfulness of the nursing education program, and 50.0% of subjects evaluating the helpfulness of the calls from the pharmacists. Knowledge exam questions that were most frequently answered incorrectly on repeat testing concerned bridge therapy, the possibility of being flare-free, and the genetic component of gout. Our multidisciplinary program of gout patient education and monitoring demonstrates feasibility and acceptability. We identified variability in patient preference for components of the program and persistent patient knowledge gaps. Copyright © 2017 The Authors. Published by Elsevier Inc. All rights reserved.
Impact of a Pharmacist-Managed Heart Failure Postdischarge (Bridge) Clinic for Veterans.
Hale, Genevieve M; Hassan, Sonia L; Hummel, Scott L; Lewis, Carrie; Ratz, David; Brenner, Michael
2017-07-01
Hospitals that provide early postdischarge follow-up after heart failure (HF) hospitalization tend to have lower rates of readmission. However, HF postdischarge (bridge) clinics have not been extensively evaluated. To assess the impact of a pharmacist-managed HF bridge clinic in a veteran population. HF patients hospitalized from November 2010 to August 2013 were identified. Retrospective chart review was conducted of 122 HF patients seen at bridge clinic compared with 122 randomly selected HF patients not seen at this clinic (usual care). Primary end point was 90-day all-cause readmission and death. Secondary outcomes were 30-day all-cause readmission and death, time to first postdischarge follow-up, first all-cause readmission. Bridge clinic patients were at higher baseline risk of readmission and death; other characteristics were similar. 90-day death and all-cause readmission trended lower in bridge clinic patients (adjusted hazard ratio [HR] = 0.64; 95% CI = 0.40-1.02; P = 0.06). Time to first follow-up was shorter in bridge clinic patients (11 ± 6 vs 20 ± 23 days; P < 0.001); time to first all-cause readmission trended longer (40 ± 20 vs 33 ± 25days; P = 0.11). 30-day death and all-cause readmission was significantly lower in bridge clinic patients (adjusted HR = 0.44; 95% CI = 0.22-0.88; P = 0.02). In veteran patients hospitalized for HF, pharmacist-managed HF bridge clinic significantly reduced the time to initial follow-up compared with usual care. Improved short-term outcomes and trend toward improvement of longer-term outcomes in bridge clinic patients was shown.
Jones, Fiona; Pöstges, Heide; Brimicombe, Lucinda
2016-10-14
Programmes providing self-management support for patients and families are gaining attention and have shown promising outcomes with regards to reducing long-term unmet needs post stroke. However, notions of what good self-management support looks like can differ depending on professional opinion, individual preferences, skills and experiences of patients and their families as well as on how care and rehabilitation is organised in a particular healthcare setting. This resonates with the perspective of patient-centred care, according to which the meaning of good care is not universal, but rather jointly shaped between healthcare professionals and patients in everyday interactions. While self-management support is continuously co-produced in care and rehabilitation practices, most self-management programmes are typically provided as an 'add-on' to existing statutory care. This paper aims to deepen the understanding of how self-management support can be made an integral part of everyday care and rehabilitation using Bridges methodology. The authors provide a self-reflective account on 'Bridges' an integrated approach to self-management support, which is used by healthcare professionals within acute and community stroke rehabilitation across the UK, and in some parts of New Zealand and Australia. Bridges is based on self-efficacy principles, but has a central aim of professionals sharing decision-making and expertise with patients and families in every healthcare interaction. Methodologically, the co-production of a Bridges support package with local healthcare professionals and patients is critical. The authors present the values articulated by the support package and how it engages professionals, patients and Bridges training facilitators in a continuous process of adjusting and re-adjusting situated self-management support practices. Our reflections reveal the need to consider development and implementation of self-management support as one and the same on-going process, if we are to facilitate successful engagement and interest from healthcare professionals as well as their patients and families.
Code of Federal Regulations, 2011 CFR
2011-04-01
... BIA and Tribally owned IRR bridges, and non-BIA owned IRR bridges? 661.35 Section 661.35 Highways... RESERVATION ROAD BRIDGE PROGRAM § 661.35 What percentage of IRRBP funding is available for use on BIA and Tribally owned IRR bridges, and non-BIA owned IRR bridges? (a) Up to 80 percent of the available funding...
Code of Federal Regulations, 2010 CFR
2010-04-01
... BIA and Tribally owned IRR bridges, and non-BIA owned IRR bridges? 661.35 Section 661.35 Highways... RESERVATION ROAD BRIDGE PROGRAM § 661.35 What percentage of IRRBP funding is available for use on BIA and Tribally owned IRR bridges, and non-BIA owned IRR bridges? (a) Up to 80 percent of the available funding...
Error Sources in Proccessing LIDAR Based Bridge Inspection
NASA Astrophysics Data System (ADS)
Bian, H.; Chen, S. E.; Liu, W.
2017-09-01
Bridge inspection is a critical task in infrastructure management and is facing unprecedented challenges after a series of bridge failures. The prevailing visual inspection was insufficient in providing reliable and quantitative bridge information although a systematic quality management framework was built to ensure visual bridge inspection data quality to minimize errors during the inspection process. The LiDAR based remote sensing is recommended as an effective tool in overcoming some of the disadvantages of visual inspection. In order to evaluate the potential of applying this technology in bridge inspection, some of the error sources in LiDAR based bridge inspection are analysed. The scanning angle variance in field data collection and the different algorithm design in scanning data processing are the found factors that will introduce errors into inspection results. Besides studying the errors sources, advanced considerations should be placed on improving the inspection data quality, and statistical analysis might be employed to evaluate inspection operation process that contains a series of uncertain factors in the future. Overall, the development of a reliable bridge inspection system requires not only the improvement of data processing algorithms, but also systematic considerations to mitigate possible errors in the entire inspection workflow. If LiDAR or some other technology can be accepted as a supplement for visual inspection, the current quality management framework will be modified or redesigned, and this would be as urgent as the refine of inspection techniques.
A cloud-based information repository for bridge monitoring applications
NASA Astrophysics Data System (ADS)
Jeong, Seongwoon; Zhang, Yilan; Hou, Rui; Lynch, Jerome P.; Sohn, Hoon; Law, Kincho H.
2016-04-01
This paper describes an information repository to support bridge monitoring applications on a cloud computing platform. Bridge monitoring, with instrumentation of sensors in particular, collects significant amount of data. In addition to sensor data, a wide variety of information such as bridge geometry, analysis model and sensor description need to be stored. Data management plays an important role to facilitate data utilization and data sharing. While bridge information modeling (BrIM) technologies and standards have been proposed and they provide a means to enable integration and facilitate interoperability, current BrIM standards support mostly the information about bridge geometry. In this study, we extend the BrIM schema to include analysis models and sensor information. Specifically, using the OpenBrIM standards as the base, we draw on CSI Bridge, a commercial software widely used for bridge analysis and design, and SensorML, a standard schema for sensor definition, to define the data entities necessary for bridge monitoring applications. NoSQL database systems are employed for data repository. Cloud service infrastructure is deployed to enhance scalability, flexibility and accessibility of the data management system. The data model and systems are tested using the bridge model and the sensor data collected at the Telegraph Road Bridge, Monroe, Michigan.
DOT National Transportation Integrated Search
2013-01-01
The Long-Term Bridge Performance (LTBP) program was created to identify, collect, and analyze research-quality data on the most critical aspects of bridge performance. To complete a thorough investigation of bridge performance issues, the Federal Hig...
DOT National Transportation Integrated Search
2013-01-01
The Long-Term Bridge Performance (LTBP) program was created to identify, collect, and analyze researchquality : data on the most critical aspects of bridge performance. To complete a thorough investigation of bridge : performance issues, the Federal ...
taxpayer resources." Common bridge types like this concrete girder bridge will not require individual bridge types, including those covered by the Program Comment, check out the NCHRP Publication: "A Context for Common Historic Bridge Types." Please contact Carol Legard at 202-606-8522 or via e-mail
ERIC Educational Resources Information Center
Suhr, Jeanne
The summer "bridge" part of the Special Transitional Enrichment Program (STEP) at the University of California (UC), Davis, was evaluated with attention to first-year academic performance and retention. STEP, part of the Educational Opportunity Program (EOP), is an orientation and academic program to help low-income and minority students…
ERIC Educational Resources Information Center
Wathington, Heather D.; Barnett, Elisabeth A.; Weissman, Evan; Teres, Jedediah; Pretlow, Joshua; Nakanishi, Aki
2011-01-01
In 2009, the National Center for Postsecondary Research (NCPR) launched an evaluation of eight developmental summer bridge programs in Texas to assess whether these programs reduce the need for developmental coursework and improve student outcomes in college. The evaluation uses an experimental design to measure the effects of these programs on…
ERIC Educational Resources Information Center
Woodall, Gina Serignese; Herrera, Richard; Thompson, Joshua R.; Ortega, Jorge Coss
2017-01-01
Summer bridge programs are supposed to connect a graduating high school senior's summer to their first semester in college, easing the transition away from home and into a university setting. Although research is plentiful on the programs, assessments regarding the overall effectiveness of such programs have been mixed (e.g., Cabrera, Miner, and…
Implementation program on high performance concrete: guidelines for instrumentation on bridges
DOT National Transportation Integrated Search
1996-08-01
This report provides an outline for the instrumentation of bridges being constructed under the Federal Highway Administration's (FHWA's) Strategic Highway Research Program (SHRP) implementation effort in High Performance Concrete (HPC). The report de...
Structural stiffness identification of bridge superstructures : final report.
DOT National Transportation Integrated Search
1996-01-01
Accurate measures of bridge stiffness are important when determining structural integrity. This information should be an integral part of any comprehensive bridge maintenance program, especially considering the nation's aging infrastructure. Informed...
Building Bridges: Experiential and Integrative Learning in a Canadian Women's Prison
ERIC Educational Resources Information Center
Pollack, Shoshana
2016-01-01
This article reports on a study of student experiences of a Walls to Bridges (W2B) class taught by Faculty of Social Work instructors in a Canadian women's prison. The Walls to Bridges (W2B) program is based on the U. S. Inside-Out Prison Exchange Program and brings students from the university together with students from the prison to study for a…
Borkowski, Nancy; Gordon, Jean; Rushing, John
2005-01-01
This paper describes the development and implementation of an undergraduate health administration program for nontraditional students at a Hispanic serving institution. The program had to meet the needs of a diverse, adult student population, the local community, and the future leadership requirements of the healthcare industry. As such, the program was designed as a "bridge" for full-time employed healthcare licensed professionals seeking to complete a baccalaureate degree and obtain positions in the healthcare management field. It answered the call of the local community to strengthen partnerships between business and education by offering the program at healthcare employer worksites. Furthermore, the program addressed three needs of the healthcare industry: (1) the recognized shortage of future healthcare leaders, (2) the under-representation of minorities in the industry, and (3) proposed changes in health administration programs' curricula to focus on competencies in the areas of communication skills, decision making, ethical leadership, and self-development.
23 CFR 661.57 - How is a list of deficient bridges to be generated?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false How is a list of deficient bridges to be generated? 661... AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.57 How is a list of deficient bridges to be generated? (a) In consultation with the BIA, a list of deficient BIA IRR bridges will be...
23 CFR 661.57 - How is a list of deficient bridges to be generated?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false How is a list of deficient bridges to be generated? 661... AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.57 How is a list of deficient bridges to be generated? (a) In consultation with the BIA, a list of deficient BIA IRR bridges will be...
Breaking down the communication barrier.
Hawkins, R A
1991-01-01
Dr. Hawkins addresses the problem of how QA managers can best persuade physicians of the importance of QA programs. Since communication is the basis of educating clinicians, the author analyzes the diametrically opposite perspectives of QA managers and physicians even as they pursue the common goal of quality healthcare. While doctors are primarily loyal to patients and peers with an immediate care focus, process-oriented QA managers emphasize the institution and its longer-term goals. To overcome physician resistance to change, Dr. Hawkins offers an adult learner model that stresses understanding the medical staff's viewpoint, negotiation and respect. Physicians are enthusiastic about QA when it helps solve "the endemic daily system problems." The author concludes by recommending that QA managers join physicians on their clinical rounds to bridge the gap between their different approaches.
Big data and high-performance analytics in structural health monitoring for bridge management
NASA Astrophysics Data System (ADS)
Alampalli, Sharada; Alampalli, Sandeep; Ettouney, Mohammed
2016-04-01
Structural Health Monitoring (SHM) can be a vital tool for effective bridge management. Combining large data sets from multiple sources to create a data-driven decision-making framework is crucial for the success of SHM. This paper presents a big data analytics framework that combines multiple data sets correlated with functional relatedness to convert data into actionable information that empowers risk-based decision-making. The integrated data environment incorporates near real-time streams of semi-structured data from remote sensors, historical visual inspection data, and observations from structural analysis models to monitor, assess, and manage risks associated with the aging bridge inventories. Accelerated processing of dataset is made possible by four technologies: cloud computing, relational database processing, support from NOSQL database, and in-memory analytics. The framework is being validated on a railroad corridor that can be subjected to multiple hazards. The framework enables to compute reliability indices for critical bridge components and individual bridge spans. In addition, framework includes a risk-based decision-making process that enumerate costs and consequences of poor bridge performance at span- and network-levels when rail networks are exposed to natural hazard events such as floods and earthquakes. Big data and high-performance analytics enable insights to assist bridge owners to address problems faster.
The Art World's Concept of Negative Space Applied to System Safety Management
NASA Technical Reports Server (NTRS)
Goodin, James Ronald (Ronnie)
2005-01-01
Tools from several different disciplines can improve system safety management. This paper relates the Art World with our system safety world, showing useful art schools of thought applied to system safety management, developing an art theory-system safety bridge. This bridge is then used to demonstrate relations with risk management, the legal system, personnel management and basic management (establishing priorities). One goal of this presentation/paper is simply to be a fun diversion from the many technical topics presented during the conference.
ERIC Educational Resources Information Center
Wathington, Heather D.; Barnett, Elisabeth A.; Weissman, Evan; Teres, Jedediah; Pretlow, Joshua; Nakanishi, Aki
2011-01-01
In 2007, the Texas Higher Education Coordinating Board (THECB) funded 22 colleges to establish developmental summer bridge programs. Aimed at providing an alternative to traditional developmental education, these programs involve intensive remedial instruction in math, reading, and/or writing and college preparation content for students entering…
Wood in transportation program-- an overview
Sheila Rimal Duwadi; Michael A. Ritter; Edward Cesa
2000-01-01
Research and demonstration bridge projects to further develop wood for transportation structures increased substantially in the United States in 1988 under a legislative action by the U.S. Congress known as the Timber Bridge Initiative. This program, renamed the Wood in Transportation Program, continues today and is administered by the Forest Service. FHWA became...
Simplified bridge load rating methodology using the national bridge inventory file : program listing
DOT National Transportation Integrated Search
1987-08-01
The purpose of this research was to develop a computerized system to determine the adequacy of a bridge or group of bridges to carry specified overload vehicles. The system utilizes two levels of analysis. The Level 1 analysis is the basic rating sys...
Remediation: Higher Education's Bridge to Nowhere
ERIC Educational Resources Information Center
Complete College America, 2012
2012-01-01
The intentions were noble. It was hoped that remediation programs would be an academic bridge from poor high school preparation to college readiness. Sadly, remediation has become instead higher education's "Bridge to Nowhere." This broken remedial bridge is travelled by some 1.7 million beginning students each year, most of whom will…
Enhancement of the FDOT's project level and network level bridge management analysis tools
DOT National Transportation Integrated Search
2011-02-01
Over several years, the Florida Department of Transportation (FDOT) has been implementing the AASHTO Pontis Bridge Management System to support network-level and project-level decision making in the headquarters and district offices. Pontis is an int...
KSC Center Director Bridges accepts an ISO 9001 certification plaque from DNV
NASA Technical Reports Server (NTRS)
1998-01-01
Center Director Roy Bridges (right) displays the 2000th ISO Certificate Plaque he was given by Dalton Lyon (left) of Det Norske Veritas (DNV), Inc., an international ISO certification organization, at a ceremony at KSC. The plaque is a representation of the ISO 9001 certification awarded to KSC by DNV. ISO 9001 comprises the most detailed, comprehensive set of standard requirements for quality programs established by the International Standards Organization. The presentation followed a successful independent audit by DNV of the KSC Management System in May of this year. The third-party auditors examined about 20 elements of KSC's system, including management responsibility, design control, documentation, test and inspection, and corrective action procedures. DNV found that KSC met or exceeded the stringent quality standards in all areas. KSC will use this certification as a tool to improve an already world- class team. All NASA centers are required by NASA Administrator Daniel S. Goldin to be ISO 9001 registered by September 1999. NASA is the first federal agency to seek the quality certification.
2000-09-06
The ribbon is cut and the new Checkout and Launch Control System (CLCS) declared operational. Those taking part in the ceremony are (from left) Joseph Rothenberg, NASA Associate Administrator for Space Flight; Pam Gillespie, from Rep. Dave Weldon's office; Roy Bridges, Kennedy Space Center director; Dave King, director of Shuttle Processing; Retha Hart, deputy associate director, Spaceport Technology Management Office; and Ron Dittemore, manager, Space Shuttle Program. The new control room will be used to process the Orbital Maneuvering System pods and Forward Reaction Control System modules at the HMF. This hardware is removed from Space Shuttle orbiters and routinely taken to the HMF for checkout and servicing
2000-09-06
The ribbon is cut and the new Checkout and Launch Control System (CLCS) declared operational. Those taking part in the ceremony are (from left) Joseph Rothenberg, NASA Associate Administrator for Space Flight; Pam Gillespie, from Rep. Dave Weldon's office; Roy Bridges, Kennedy Space Center director; Dave King, director of Shuttle Processing; Retha Hart, deputy associate director, Spaceport Technology Management Office; and Ron Dittemore, manager, Space Shuttle Program. The new control room will be used to process the Orbital Maneuvering System pods and Forward Reaction Control System modules at the HMF. This hardware is removed from Space Shuttle orbiters and routinely taken to the HMF for checkout and servicing
ERIC Educational Resources Information Center
Bowles, Laura; Piggott, Gail B.
The Employers' Child Care Alliance, a group of major employers in Lee County, Alabama, developed the "Bridges" program, an innovative program for children ages 10-14 during out-of-school time. The program focuses on the growth of the whole child, specifically in areas not traditionally focused on in school, such as creative development, cultural…
NASA Astrophysics Data System (ADS)
Smecker-Hane, Tammy A.; Rudolph, Alexander L.
2016-06-01
The mission of the Cal-Bridge program is to increase the number of underrepresented minority and women students completing a bachelor’s degree and entering a PhD program in astronomy, physics, or closely-related fields. The program has created a network of faculty at diverse higher education institutions, including 5 University of California (UC) campuses, 9 California State Universities (CSUs), and 10 community colleges in southern California, dedicated to this goal. Students selected for the program are know as “Cal-Bridge Scholars” and they are given a wide variety of support: (1) scholarships in their junior/senior years at CSU and their first year of graduate school at a UC, (2) intensive mentoring by a pair of CSU and UC faculty members, (3) tutoring, when needed, (4) professional development workshops, (5) exposure to research opportunities at various universities, and (6) membership in a growing cohort of like-minded students. We report on the structure of our program, lessons learned with our current 12 Cal-Bridge scholars, and the results of our first two years of operation. Funding for this program is provided by NSF-SSTEM Grant #1356133.
Field performance of timber bridges. 10, Sanborn Brook stress-laminated deck bridge
P. D. Hilbrich Lee; J. P. Wacker; M. A. Ritter
The Sanborn Brook bridge was constructed in August 1991, 10 miles northeast of Concord, New Hampshire, as part of the demonstration timber bridge program of the USDA Forest Service. The bridge is a simple-span, double-lane, stress-laminated deck superstructure constructed from Southern Pine lumber and is approximately 25 ft long and 28 ft wide with a skew of 14 degrees...
DOT National Transportation Integrated Search
2014-10-01
This research program develops and validates structural design guidelines and details for concrete bridge decks with : corrosion-resistant reinforcing (CRR) bars. A two-phase experimental program was conducted where a control test set consistent : wi...
Accelerated bridge paint test program.
DOT National Transportation Integrated Search
2011-07-06
The accelerated bridge paint (AB-Paint) program evaluated a new Sherwin-Williams two-coat, : fast-curing paint system. The system is comprised of an organic zinc-rich primer (SW Corothane I : Galvapac One-Pack Zinc-Rich Primer B65 G11) and a polyurea...
Managing Florida's fracture critical bridges - phases 1 and 2 [summary].
DOT National Transportation Integrated Search
2016-05-01
Florida International University researchers : examined the possibility of removing twin steel : box-girder bridges from the list of fracture critical : structures. They studied the behavior of steel twin : box-girder bridges and developed a tool to ...
DOT National Transportation Integrated Search
2015-06-01
Bridge managers have historically relied on visual inspection reports and field observation, including : photographs, to assess bridge health. The inclusion of instrumentation, including strain gauges, along : with a structural model can enhance brid...
Synthesis of National and International Methodologies Used for Bridge Health Indices
DOT National Transportation Integrated Search
2016-05-01
Bridge performance measures are important components of any successful Bridge Management System. Different types of performance measures have been developed for various purposes. The types of performance measures are usually a reflection of an agency...
Industry liaison section implementation plan
NASA Technical Reports Server (NTRS)
Lakowske, Stephen
1990-01-01
The Industry Liaison Section is a new function of the Army/NASA Aircrew-Aircraft Integration (AAAI) Program that is intended to bridge an existing gap between Government developers (including contractors) and outside organizations who are potential users of products and services developed by the AAAI Program. Currently in its sixth year, the Program is experiencing considerable pull from industry and other government organizations to disseminate products. Since the AAAI Program's charter is exploratory and research in nature, and satisfying proper dissemination requirements is in conflict with the rapid prototyping approach utilized by the design team, the AAAI Program has elected to create an Industry Liaison Section (ILS) to serve as the Program's technology transfer focal point. The process by which the ILS may be established, organized and managed is described, including the baseline organizational structure, duties, functions, authority, responsibilities, relations and policies and procedures relevant to the conduct of the ILS.
23 CFR 661.53 - What standards should be used for bridge design?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false What standards should be used for bridge design? 661.53... TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.53 What standards should be used for bridge design? (a) Replacement—A replacement structure must meet the current geometric, construction and...
23 CFR 661.49 - Can IRRBP funds be spent on Interstate, State Highway, and Toll Road IRR bridges?
Code of Federal Regulations, 2011 CFR
2011-04-01
..., and Toll Road IRR bridges? 661.49 Section 661.49 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.49 Can IRRBP funds be spent on Interstate, State Highway, and Toll Road IRR bridges? Yes. Interstate...
Live Load Testing of Historic Covered Timber Bridges
Travis Hosteng; James Wacker; Brent Phares
2013-01-01
The National Historic Covered Bridge Preservation Program (NHCBP), sponsored by the Federal Highway Administration (FHWA), is intended to preserve covered timber bridge structures nationwide. Today, less than 700 covered timber bridges still exist in the United States and of those many are closed to vehicular traffic. Furthermore, a large percentage of the remaining...
23 CFR 661.53 - What standards should be used for bridge design?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false What standards should be used for bridge design? 661.53... TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.53 What standards should be used for bridge design? (a) Replacement—A replacement structure must meet the current geometric, construction and...
23 CFR 661.49 - Can IRRBP funds be spent on Interstate, State Highway, and Toll Road IRR bridges?
Code of Federal Regulations, 2010 CFR
2010-04-01
..., and Toll Road IRR bridges? 661.49 Section 661.49 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.49 Can IRRBP funds be spent on Interstate, State Highway, and Toll Road IRR bridges? Yes. Interstate...
NASA Astrophysics Data System (ADS)
Young Morse, R.; Mecray, E. L.; Pershing, A. J.
2015-12-01
As interest in the global change in temperatures and precipitation patterns grow, federal, state, and local agencies are turning to the delivery of 'actionable science and information' or 'information for decision-makers.' NOAA/National Centers for Environmental Information's Regional Climate Services program builds these bridges between the user of information and the producers of the information. With the Climate Data Records program, this study will present the extraction and use of the sea-surface temperature datasets specifically for access and use by fisheries managers in the north Atlantic. The work demonstrates the staged approach of accessing the records, converting their initial data formats into maps and charts, and the delivery of the data as a value-added information dashboard for use by managers. The questions to be reviewed include the ease of access, the delivery of open source software for visualizing the information, and a discussion on the roles of government and the private sector in the provision of climate information at different scales.
ERIC Educational Resources Information Center
Emery, Erin E.; Lapidos, Stan; Eisenstein, Amy R.; Ivan, Iulia I.; Golden, Robyn L.
2012-01-01
Purpose: To demonstrate the feasibility of the BRIGHTEN Program (Bridging Resources of an Interdisciplinary Geriatric Health Team via Electronic Networking), an interdisciplinary team intervention for assessing and treating older adults for depression in outpatient primary and specialty medical clinics. The BRIGHTEN team collaborates "virtually"…
Impact of Online Summer Mathematics Bridge Program on Placement Scores and Pass Rates
ERIC Educational Resources Information Center
Frost, Jodi L.; Dreher, J. P.
2017-01-01
An online four-week summer mathematics bridge program was implemented at a Midwest university with historically low pass rates in College Algebra and Remedial Mathematics. Students who completed the four week program significantly increased their mathematics placement exam scores. These students also had a higher pass rate in their initial college…
ERIC Educational Resources Information Center
Wathington, Heather D.; Barnett, Elisabeth A.; Weissman, Evan; Teres, Jedediah; Pretlow, Joshua; Nakanishi, Aki
2011-01-01
In 2007, the Texas Higher Education Coordinating Board (THECB) funded 22 colleges to establish developmental summer bridge programs. Aimed at providing an alternative to traditional developmental education, these programs involve intensive remedial instruction in math, reading, and/or writing and college preparation content for students entering…
The Bridges SOI Model School Program at Palo Verde School, Palo Verde, Arizona.
ERIC Educational Resources Information Center
Stock, William A.; DiSalvo, Pamela M.
The Bridges SOI Model School Program is an educational service based upon the SOI (Structure of Intellect) Model School curriculum. For the middle seven months of the academic year, all students in the program complete brief daily exercises that develop specific cognitive skills delineated in the SOI model. Additionally, intensive individual…
ERIC Educational Resources Information Center
Tomasko, David L.; Ridgway, Judith S.; Waller, Rocquel J.; Olesik, Susan V.
2016-01-01
Retention of students to science, technology, engineering, and mathematics (STEM) major has been studied for four cohorts participating in a summer bridge program supported by the National Science Foundation. Students participated in a 6-week program prior to their first term of enrollment at a research-intensive land grant university. Comparisons…
Dune management challenges on developed coasts
Elko, Nicole A.; Brodie, Kate; Stockdon, Hilary F.; Nordstrom, Karl F.; Houser, Chris; McKenna, Kim; Moore, Laura; Rosati, Julie D.; Ruggiero, Peter; Thuman, Roberta; Walker, Ian J.
2015-01-01
From October 26-28, 2015, nearly 100 members of the coastal management and research communities met in Kitty Hawk, NC, USA to bridge the apparent gap between the coastal dune research of scientists and engineers and the needs of coastal management practitioners. The workshop aimed to identify the challenges involved in building and managing dunes on developed coasts, assess the extent to which scientific knowledge can be applied to the management community, and identify approaches to provide means to bridge the gap between needs and potential solutions.
NASA Astrophysics Data System (ADS)
Friedl, L. A.; Cox, L.
2008-12-01
The NASA Applied Sciences Program collaborates with organizations to discover and demonstrate applications of NASA Earth science research and technology to decision making. The desired outcome is for public and private organizations to use NASA Earth science products in innovative applications for sustained, operational uses to enhance their decisions. In addition, the program facilitates the end-user feedback to Earth science to improve products and demands for research. The Program thus serves as a bridge between Earth science research and technology and the applied organizations and end-users with management, policy, and business responsibilities. Since 2002, the Applied Sciences Program has sponsored over 115 applications-oriented projects to apply Earth observations and model products to decision making activities. Projects have spanned numerous topics - agriculture, air quality, water resources, disasters, public health, aviation, etc. The projects have involved government agencies, private companies, universities, non-governmental organizations, and foreign entities in multiple types of teaming arrangements. The paper will examine this set of applications projects and present specific examples of successful use of Earth science in decision making. The paper will discuss scientific, organizational, and management factors that contribute to or impede the integration of the Earth science research in policy and management. The paper will also present new methods the Applied Sciences Program plans to implement to improve linkages between science and end users.
A sustainable dietetics bridging program: development and implementation in Atlantic Canada.
Lordly, Daphne; Guy, Jennifer; Barry, Paula; Garus, Jennifer
2014-01-01
A provincial focus on immigration and improved foreign credential recognition has led to an investigation of best practices and subsequent recommendations for the development and implementation of a sustainable university-based bridging program for internationally educated dietitians in Atlantic Canada. Data were collected from various sources and used to inform program decisions and direction. An advisory framework was established through a core group representing dietetics education and regulation and internationalization. Subsequently, a key stakeholder group was formed. As a result of this collaboration and research, a dietetics bridging framework was developed and a program pilot tested. Lessons learned may inform similar endeavours and highlight the importance of collaborative leadership and collaboration among multiple stakeholders, and of creatively addressing program sustainability issues while keeping learners (internationally educated dietitians) at the centre.
NASA Technical Reports Server (NTRS)
Hayati, Samad A.
2002-01-01
Future Mars missions require new capabilities that currently are not available. The Mars Technology Program (MTP) is an integral part of the Mars Exploration Program (MEP). Its sole purpose is to assure that required technologies are developed in time to enable the baselined and future missions. The MTP is a NASA-wide technology development program managed by JPL. It is divided into a Focused Program and a Base Program. The Focused Program is tightly tied to the proposed Mars Program mission milestones. It involves time-critical deliverables that must be developed in time for infusion into the proposed Mars 2005, and, 2009 missions. In addition a technology demonstration mission by AFRL will test a LIDAR as part of a joint NASNAFRL experiment. This program bridges the gap between technology and projects by vertically integrating the technology work with pre-project development in a project-like environment with critical dates for technology infusion. A Base Technology Program attacks higher riskhigher payoff technologies not in the critical path of missions.
Element level bridge inspection : benefits and use of data for bridge management.
DOT National Transportation Integrated Search
2016-02-01
In 2012, Congress passed the Moving Ahead for Progress in the 21st Century Act (MAP-21) and committed to the development of a datadriven, : risk based approach to asset management in the United States. This law requires the collection and submission ...
Evaluation of FRP repair method for cracked bridge members.
DOT National Transportation Integrated Search
2005-01-01
This research program was undertaken to investigate the effects Carbon Fiber Reinforced Polymers (CFRP) have on the shear strength on under-reinforced, lab-scale prestressed concrete (PC) bridge girders. Many bridges in the states of Missouri and Kan...
Construction of crack-free bridge decks.
DOT National Transportation Integrated Search
2017-04-01
This serves as the final report on Transportation Pooled-Fund Program Project No. TPF-5(174), Construction : of Crack-Free Bridge Decks. The goal of the study was to implement the most cost-effective techniques for : improving bridge deck life ...
Implementing HPC on the Sunshine Bridge project
DOT National Transportation Integrated Search
2007-11-01
This report presents the research work from a pilot program regarding the feasibility of implementing high performance concrete on Arizona bridge decks, using the Sunshine Bridge in Holbrook, Arizona as a test case. An existing concrete slab was remo...
Implementing HPC on the Sunshine Bridge Project
DOT National Transportation Integrated Search
2007-11-16
This report presents the research work from a pilot program regarding the feasibility of implementing high performance concrete on Arizona bridge decks, using the Sunshine Bridge in Holbrook, Arizona as a test case. An existing concrete slab was remo...
1999-06-17
A panel of NASA and contractor senior staff, plus officers from the 45th Space Wing, discuss safetyand health-related concerns in front of an audience of KSC employees as part of Super Safety and Health Day. Moderating at the podium is Loren Shriver, deputy director for Launch & Payload Processing. Seated left to right are Burt Summerfield, associate director of the Biomedical Office; Colonel William S. Swindling, commander, 45th Medical Group, Patrick Air Force Base, Fla.; Ron Dittemore, manager, Space Shuttle Programs, Johnson Space Center; Roy Bridges, Center Director; Col. Tom Deppe, vice commander, 45th Space Wing, Patrick Air Force Base; Jim Schoefield, program manager, Payload Ground Operations, Boeing; Bill Hickman, program manager, Space Gateway Support; and Ed Adamek, vice president and associate program manager for Ground Operations, United Space Alliance. Answering a question at the microphone on the floor is Dave King, director, Shuttle Processing. The panel was one of the presentations during KSC's second annual day-long dedication to safety. Most normal work activities were suspended to allow personnel to attend related activities. The theme, "Safety and Health Go Hand in Hand," emphasized KSC's commitment to place the safety and health of the public, astronauts, employees and space-related resources first and foremost. Events also included a keynote address, vendor exhibits, and safety training in work groups. The keynote address and panel session were also broadcast internally over NASA television
Expert panel answers questions for Super Safety and Health Day at KSC.
NASA Technical Reports Server (NTRS)
1999-01-01
A panel of NASA and contractor senior staff, plus officers from the 45th Space Wing, discuss safety- and health-related concerns in front of an audience of KSC employees, as part of Super Safety and Health Day. Moderating at the podium is Loren Shriver, deputy director for Launch & Payload Processing. Seated left to right are Burt Summerfield, associate director of the Biomedical Office; Colonel William S. Swindling, commander, 45th Medical Group, Patrick Air Force Base, Fla.; Ron Dittemore, manager, Space Shuttle Programs, Johnson Space Center; Roy Bridges, Center Director; Col. Tom Deppe, vice commander, 45th Space Wing, Patrick Air Force Base; Jim Schoefield, program manager, Payload Ground Operations, Boeing; Bill Hickman, program manager, Space Gateway Support; and Ed Adamek, vice president and associate program manager for Ground Operations, United Space Alliance. The panel was one of the presentations during KSC's second annual day-long dedication to safety. Most normal work activities were suspended to allow personnel to attend related activities. The theme, 'Safety and Health Go Hand in Hand,' emphasized KSC's commitment to place the safety and health of the public, astronauts, employees and space-related resources first and foremost. Events also included a keynote address, vendor exhibits, and safety training in work groups. The keynote address and panel session were also broadcast internally over NASA television.
Expert panel answers questions for Super Safety and Health Day at KSC.
NASA Technical Reports Server (NTRS)
1999-01-01
A panel of NASA and contractor senior staff, plus officers from the 45th Space Wing, discuss safety- and health-related concerns in front of an audience of KSC employees as part of Super Safety and Health Day. Moderating at the podium is Loren Shriver, deputy director for Launch & Payload Processing. Seated left to right are Burt Summerfield, associate director of the Biomedical Office; Colonel William S. Swindling, commander, 45th Medical Group, Patrick Air Force Base, Fla.; Ron Dittemore, manager, Space Shuttle Programs, Johnson Space Center; Roy Bridges, Center Director; Col. Tom Deppe, vice commander, 45th Space Wing, Patrick Air Force Base; Jim Schoefield, program manager, Payload Ground Operations, Boeing; Bill Hickman, program manager, Space Gateway Support; and Ed Adamek, vice president and associate program manager for Ground Operations, United Space Alliance. Answering a question at the microphone on the floor is Dave King, director, Shuttle Processing. The panel was one of the presentations during KSC's second annual day-long dedication to safety. Most normal work activities were suspended to allow personnel to attend related activities. The theme, 'Safety and Health Go Hand in Hand,' emphasized KSC's commitment to place the safety and health of the public, astronauts, employees and space- related resources first and foremost. Events also included a keynote address, vendor exhibits, and safety training in work groups. The keynote address and panel session were also broadcast internally over NASA television.
SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 6: Controls and guidance
NASA Technical Reports Server (NTRS)
1991-01-01
Viewgraphs of briefings from the Space Systems and Technology Advisory Committee (SSTAC)/ARTS review of the draft Integrated Technology Plan (ITP) on controls and guidance are included. Topics covered include: strategic avionics technology planning and bridging programs; avionics technology plan; vehicle health management; spacecraft guidance research; autonomous rendezvous and docking; autonomous landing; computational control; fiberoptic rotation sensors; precision instrument and telescope pointing; microsensors and microinstruments; micro guidance and control initiative; and earth-orbiting platforms controls-structures interaction.
Sustainable NREL Biennial Report, FY 2012 - 2013 (Management Report)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Slovensky, Michelle
2014-03-01
NREL's Sustainability Program plays a vital role bridging research and operations - integrating energy efficiency, water and material resource conservation and cultural change - adding depth in the fulfillment of NREL's mission. The report, per the GRI reporting format, elaborates on multi-year goals relative to executive orders, achievements, and challenges; and success stories provide specific examples. A section called "The Voice of NREL" gives an inside perspective of how to become more sustainable while at the same time addressing climate change.
2016-01-01
Jordan), Southeast Asia ( Malaysia ), Africa (Uganda), and the Pacific (Fiji), in addition to Washington, D.C.15 8 CFE-DMHA, 2015e. 9 CFE-DMHA, H.E.L.P...components include facilities and services (e.g., classroom conditions and food and beverage), instructor quality (e.g., presenters set a positive...bridge between civilian and military organizations, as demonstrated by its collabora- tion with OCHA, as well as the World Food Program and other
23 CFR 661.51 - Can IRRBP funds be used for the approach roadway to a bridge?
Code of Federal Regulations, 2011 CFR
2011-04-01
... bridge? 661.51 Section 661.51 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.51 Can IRRBP funds be used for the approach roadway to a bridge? (a) Yes, costs associated with approach roadway work, as defined in...
Live-load performance evaluation of historic covered timber bridges in the United States
Junwon Seo; Travis K. Hosteng; Brent M. Phares; James P. Wacker
2015-01-01
The National Historic Covered Bridge Preservation Program (NHCBP), sponsored by the Federal Highway Administration (FHWA), was established to preserve the covered timber bridge structures that were constructed in the early 1800s. Today, many of the approximately 880 covered timber bridges still in existence in the United States are closed to vehicular traffic;...
23 CFR 661.51 - Can IRRBP funds be used for the approach roadway to a bridge?
Code of Federal Regulations, 2010 CFR
2010-04-01
... bridge? 661.51 Section 661.51 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.51 Can IRRBP funds be used for the approach roadway to a bridge? (a) Yes, costs associated with approach roadway work, as defined in...
Development of Degradation Rates for Various Bridge Types in the State of Ohio
DOT National Transportation Integrated Search
2011-03-01
The Ohio Department of Transportation (ODOT) maintains a Bridge Management System (BMS) which is : responsible for collecting and maintaining historical and longitudinal data by year for all the bridges in Ohio. The BMS aids : ODOT in tracking, desig...
Development of degradation rates for various bridge types in the state of Ohio.
DOT National Transportation Integrated Search
2011-03-01
The Ohio Department of Transportation (ODOT) maintains a Bridge Management System (BMS) which is : responsible for collecting and maintaining historical and longitudinal data by year for all the bridges in Ohio. The BMS aids : ODOT in tracking, desig...
ERIC Educational Resources Information Center
Reisel, John R.; Jablonski, Marissa; Hosseini, Hossein; Munson, Ethan
2012-01-01
A summer bridge program for incoming engineering and computer science freshmen has been used at the University of Wisconsin-Milwaukee from 2007 to 2010. The primary purpose of this program has been to improve the mathematics course placement for incoming students who initially place into a course below Calculus I on the math placement examination.…
ERIC Educational Resources Information Center
Strawn, Julie
2011-01-01
Students forced to complete a long sequence of remedial or English language classes before they can begin their postsecondary program rarely earn college certificates or degrees. This brief highlights six promising programs that show how career pathway bridges help lower-skilled students move farther and faster along college and career paths…
Standardization of quality control plans for highway bridges in Europe: COST Action TU 1406
NASA Astrophysics Data System (ADS)
Casas, Joan R.; Matos, Jose Campos e.
2017-09-01
In Europe, as all over the world, the need to manage roadway bridges in an efficient way led to the development of different management systems. Hence, nowadays, many European countries have their own system. Although they present a similar architectural framework, several differences can be appointed. These differences constitute a divergent mechanism that may conduct to different decisions on maintenance actions. Within the roadway bridge management process, the identification of maintenance needs is more effective when developed in a uniform and repeatable manner. This process can be accomplished by the identification of performance indicators and definition of performance goals and key performance indicators (KPI), improving the planning of maintenance strategies. Therefore, a discussion at a European level, seeking to achieve a standardized approach in this subject, will bring significant benefits. Accordingly, a COST Action is under way in Europe with the aim of standardizing the establishment of quality control plans for roadway bridges.
33 CFR 157.415 - Bridge resource management policy and procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... VESSELS CARRYING OIL IN BULK Interim Measures for Certain Tank Vessels Without Double Hulls Carrying Petroleum Oils § 157.415 Bridge resource management policy and procedures. (a) Not later than February 1..., processing, and interpreting all essential information and making it conveniently available to other members...
33 CFR 157.415 - Bridge resource management policy and procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... VESSELS CARRYING OIL IN BULK Interim Measures for Certain Tank Vessels Without Double Hulls Carrying Petroleum Oils § 157.415 Bridge resource management policy and procedures. (a) Not later than February 1..., processing, and interpreting all essential information and making it conveniently available to other members...
33 CFR 157.415 - Bridge resource management policy and procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... VESSELS CARRYING OIL IN BULK Interim Measures for Certain Tank Vessels Without Double Hulls Carrying Petroleum Oils § 157.415 Bridge resource management policy and procedures. (a) Not later than February 1..., processing, and interpreting all essential information and making it conveniently available to other members...
Concrete box-beam deterioration, phase II : appendices.
DOT National Transportation Integrated Search
2009-04-13
Side-by-side box-beam bridge constitutes approximately 17 percent of bridges built or replaced annually on public roads and there is a renewed thrust to use this bridge type for rapid construction under the Highway for LIFE program. Further, failure ...
Chapter 10:Hardwoods for timber bridges
James P. Wacker; Ed T. Cesa
2005-01-01
This chapter describes the joint efforts of the Forest Service and the FHWA to administer national programs including research, demonstration bridges, and technology transfer components. Summary information on a number of Forest Service-WIT demonstration bridges constructed with hardwoods is also provided.
Venture Creation Programs: Bridging Entrepreneurship Education and Technology Transfer
ERIC Educational Resources Information Center
Lackéus, Martin; Williams Middleton, Karen
2015-01-01
Purpose: The purpose of this paper is to explore how university-based entrepreneurship programs, incorporating real-life venture creation into educational design and delivery, can bridge the gap between entrepreneurship education and technology transfer within the university environment. Design/methodology/approach: Based on a literature review…
Engaging Faculty for Innovative STEM Bridge Programs
ERIC Educational Resources Information Center
Goldfien, Andrea C.; Badway, Norena Norton
2014-01-01
Bridge programs, in which underprepared students gain the academic and technical skills necessary for college level courses and entry-level employment, are a promising initiative for expanding access to, and success in, community college education. For career pathways related to science, technology, engineering, or mathematics (STEM), bridge…
Wireless data collection retrievals of bridge inspection/management information.
DOT National Transportation Integrated Search
2017-02-28
To increase the efficiency and reliability of bridge inspections, MDOT contracted to have a 3D-model-based data entry application for mobile tablets developed to aid inspectors in the field. The 3D Bridge App is a mobile software tool designed to fac...
The post Challenger era Get Away Special program January 1992
NASA Technical Reports Server (NTRS)
Prouty, Clarke
1992-01-01
The Get Away Special (GAS) program is described in terms of the changes that have taken place in both NASA and the GAS itself. Attention is given to the relationships developed between NASA and GAS customers in the context of programmatic and technical issues. The background of the GAS program is outlined with reference given to policy publications, the design of the Flight Verification Payload, and the first GAS payload launched. A review process is described that facilitates the management of the payloads through flight certification. The GAS Bridge was developed to carry up to 12 payloads simultaneously, and the recent period of GAS inactivity is explained. A price increase is introduced for future GAS payloads with negotiable access to optional services, and the ease and accessibility of the GAS programs for private experiments is emphasized.
Change management in health care.
Campbell, Robert James
2008-01-01
This article introduces health care managers to the theories and philosophies of John Kotter and William Bridges, 2 leaders in the evolving field of change management. For Kotter, change has both an emotional and situational component, and methods for managing each are expressed in his 8-step model (developing urgency, building a guiding team, creating a vision, communicating for buy-in, enabling action, creating short-term wins, don't let up, and making it stick). Bridges deals with change at a more granular, individual level, suggesting that change within a health care organization means that individuals must transition from one identity to a new identity when they are involved in a process of change. According to Bridges, transitions occur in 3 steps: endings, the neutral zone, and beginnings. The major steps and important concepts within the models of each are addressed, and examples are provided to demonstrate how health care managers can actualize the models within their health care organizations.
DOT National Transportation Integrated Search
2011-09-01
Many U.S. bridges were built during the 1960s. Evaluating the structural condition of these bridges under todays traffic loads and safety expectations is difficult. This project is developing a practical program for structural health monitoring of...
Bridge maintenance program for the City of Columbia, Missouri : tech transfer summary.
DOT National Transportation Integrated Search
2017-09-01
The primary goal of this research was to extend the service lives of bridges in Columbia, Missouri. The overarching objective of the project was to develop bridge maintenance and preservation guidelines that focus on practical and implementable techn...
Bridge maintenance Program for the City of Columbia, Missouri : final report.
DOT National Transportation Integrated Search
2017-09-22
The goal of this project was to extend the service lives of bridges located in Columbia, Missouri. The objective of the project was to develop guidelines for bridge maintenance and preservation. The guidelines developed are focused on practical and i...
Monitoring and load distribution study for the land bridge.
DOT National Transportation Integrated Search
2010-09-01
A monitoring program and a live load distribution study were conducted for the Land Bridge, located on : State Highway 131 between Ontario and LaFarge in southwest Wisconsin. The bridge is a 275-ft long curved : double trapezoidal steel box girder co...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false After a bridge project has been completed (either PE or... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.41 After a bridge project has been completed (either PE or construction) what happens with...
Durability and Wood Protection for Historic Covered Bridges in the United States
Vina W. Yang; Carol A. Clausen
2014-01-01
A majority of the covered wooden bridges in United States were built in the mid -1800âs. These structures represent a unique cultural and technological heritage from that era. Over time, these bridges have been deteriorated by microorganisms and insects or damaged by acts of vandalism and arson. The National Historic Covered Bridge Preservation (NHCBP) Program...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false After a bridge project has been completed (either PE or... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.41 After a bridge project has been completed (either PE or construction) what happens with...
Learning Bridge: Curricular Integration of Didactic and Experiential Education
Arendt, Cassandra S.; Cawley, Pauline; Buhler, Amber V.; Elbarbry, Fawzy; Roberts, Sigrid C.
2010-01-01
Objectives To assess the impact of a program to integrate introductory pharmacy practice experiences with pharmaceutical science topics by promoting active learning, self-directed learning skills, and critical-thinking skills. Design The Learning Bridge, a curriculum program, was created to better integrate the material first-year (P1) students learned in pharmaceutical science courses into their introductory pharmacy practice experiences. Four Learning Bridge assignments required students to interact with their preceptors and answer questions relating to the pharmaceutical science material concurrently covered in their didactic courses. Assessment Surveys of students and preceptors were conducted to measure the effectiveness of the Learning Bridge process. Feedback indicated the Learning Bridge promoted students' interaction with their preceptors as well as development of active learning, self-directed learning, and critical-thinking skills. Students also indicated that the Learning Bridge assignments increased their learning, knowledge of drug information, and comprehension of relevant data in package inserts. Conclusion The Learning Bridge process integrated the didactic and experiential components of the curriculum, enhancing student learning in both areas, and offered students educational opportunities to interact more with their preceptors. PMID:20498741
DOT National Transportation Integrated Search
2011-03-01
The Ohio Department of Transportation (ODOT) maintains a Bridge Management System (BMS) which is : responsible for collecting and maintaining historical and longitudinal data by year for all the bridges in : Ohio.BMS aids ODOT in tracking, design, pl...
DOT National Transportation Integrated Search
2011-03-01
The Ohio Department of Transportation (ODOT) maintains a Bridge Management System (BMS) which is responsible for collecting and maintaining historical and longitudinal data by year for all the bridges in Ohio.BMS aids ODOT in tracking, design, planni...
23 CFR 973.210 - Indian lands bridge management system (BMS).
Code of Federal Regulations, 2013 CFR
2013-04-01
... analysis (as appropriate, considering size of structure, traffic volume, and structural condition). The investment analysis may include the ability to: (1) Identify alternative strategies to improve bridge... analyzing data for all bridges in the inventory or any subset. The minimum analyses shall include: (i) A...
Bridging the Scholar-Practitioner Gap: The San Antonio Export Leaders Program
ERIC Educational Resources Information Center
Jackson, Sara C.
2013-01-01
Bridging the gap between theory and practice enables trade service providers to effectively reach the small business community interested in entering foreign markets. This paper describes how the award-winning San Antonio Export Leaders program is a model for applying theoretical concepts to the practice of international business.
25 CFR 170.504 - When and how are bridge inspections performed?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false When and how are bridge inspections performed? 170.504 Section 170.504 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...
25 CFR 170.505 - How must bridge inspections be coordinated?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false How must bridge inspections be coordinated? 170.505 Section 170.505 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...
Focus on Student Success: Components for Effective Summer Bridge Programs
ERIC Educational Resources Information Center
Gonzalez Quiroz, Alicia; Garza, Nora R.
2018-01-01
Using research focused on best practices, focus group information, and data analytics, the Title V: Focus on Student Success (FOSS) Grant created a model for the development, implementation, and evaluation of a summer bridge program. Results included increased academic performance indicators in first-year Hispanic college students. Validation for…
Flood Early Warning in Bridge Management System: from idea to implementation
NASA Astrophysics Data System (ADS)
Kerin, Igor; Bekić, Damir; Michalis, Panagiotis; Šolman, Hrvoje; Cahill, Paul; Gilja, Gordon; Pakrashi, Vikram; Lapthorne, John; McKeogh, Eamon
2017-04-01
Recent advances in computational speed, cloud systems and GPRS data are some of the factors that have resulted in an increased number of operational and fully automatized Flood Early Warning Systems (FEWS). Flood forecasting is becoming a well-recognised solution for flood management as an indirect measure for minimising the risk should preventive or defence measures prove ineffective or are not feasible for implementation. Public acceptance of FEWS as a standalone solution is still considered to be at low level. Further public engagement regarding engineering risks and providing timely notifications and warnings can, however, establish the true value of such a system to the society in general. Flood risks can be direct, resulting in damage to buildings, infrastructure and natural resources, or indirect, which can be related to disaster losses leading to declines in commercial output or revenue and impact on wellbeing of people, typically from disruptions to the flow of goods and services. Flood risk and structural risks are closely related, thereby impacting the maintenance and management of bridges assets over watercourses. Many studies indicate that most bridge collapses are related to hydraulic effects and consequently scour issues (i.e. the removal of riverbed around bridge foundations due to flowing water). Consequently, hydraulic, hydrologic and geotechnical expertise and knowledge can lead to introducing FEWS as a key tool for Bridge Scour Management System (BSMS), forming a part of a BMS. The implementation of this concept was initiated with the EU/FP7 funded project BRIDGE SMS. The project introduces BSMS into the overall BMS to develop a reliable decision support tool which would efficiently manage bridge failure risks in a cost-effective way. This is accomplished through the development of FEWS, alongside monitoring systems that can provide important information about environmental and structural conditions at the catchment area and bridge site respectively. The recorded rainfall from instrumentation deployed over a catchment is used as input data for hydrological modelling and now-casting, which results in flow hydrographs at the bridge containing flow rates and water level information. Soil moisture data is also used to determine the appropriate hydrological model set-up, such as dry, medium or saturated catchment conditions. The output from the hydrological model is a now-cast flow hydrograph, with a lag time of up to 24 hours. Discharge hydrograph is correlated to water levels using an existing rating curve and to the flow velocity using discharge-flow velocity curve. Water levels and flow rates are correlated to the flow velocity which provide the basis for the prediction of scour depth. FEWS in BMS introduces readiness for extreme flood events, pointing out key indicators prior to an event. Also, by considering climate change effects which is resulting in more extreme weather phenomena's, FEWS provides important information about bridge safety and assists to coordinate resources in an efficient and cost-effective way. Acknowledgement The authors wish to acknowledge the financial support of the European Commission, through the Marie-Curie Industry-Academia Partnership and Pathways Network BRIDGE SMS (Intelligent Bridge Assessment Maintenance and Management System) - FP7-People-2013-IAPP- 612517.
BIM authoring for an image-based bridge maintenance system of existing cable-supported bridges
NASA Astrophysics Data System (ADS)
Dang, N. S.; Shim, C. S.
2018-04-01
Infrastructure nowadays is increasingly become the main backbone for the metropolitan development in general. Along with the rise of new facilities, the demand in term of maintenance for the existing bridges is indispensable. Recently, the terminology of “preventive maintenance” is not unfamiliar with the engineer, literally is the use of a bridge maintenance system (BMS) based on a BIM-oriented model. In this paper, the process of generating a BMS based on BIM model is introduced in detail. Data management for this BMS is separated into two modules: site inspection system and information management system. The noteworthy aspect of this model lays on the closed and automatic process of “capture image, generate the technical damage report, and upload/feedback to the BMS” in real-time. A pilot BMS system for a cable-supported bridge is presented which showed a good performance and potential to further development of preventive maintenance.
DOT National Transportation Integrated Search
2009-11-01
The Oregon Department of Transportation and Portland State University evaluated the seismic : vulnerability of state highway bridges in western Oregon. The study used a computer program : called REDARS2 that simulated the damage to bridges within a t...
Neighborhood Bridges: 2010-2011 Evaluation Report
ERIC Educational Resources Information Center
Ingram, Debra
2011-01-01
In 2010-2011, students in twenty-five classrooms from eleven schools in the Minneapolis-Saint Paul metropolitan area participated in The Children's Theatre Company's Neighborhood Bridges (Bridges) program. The Children's Theatre Company contracted with the University of Minnesota's Center for Applied Research and Educational Improvement (CAREI) to…
Murphy, Terrence E; Gaughan, Monica; Hume, Robert; Moore, S Gordon
2010-03-01
There are many approaches to solving the problem of underrepresentation of some racial and ethnic groups and women in scientific and technical disciplines. Here, the authors evaluate the association of a summer bridge program with the graduation rate of underrepresented minority (URM) students at a selective technical university. They demonstrate that this 5-week program prior to the fall of the 1st year contains elements reported as vital for successful student retention. Using multivariable survival analysis, they show that for URM students entering as fall-semester freshmen, relative to their nonparticipating peers, participation in this accelerated summer bridge program is associated with higher likelihood of graduation. The longitudinal panel data include more than 2,200 URM students.
Murphy, Terrence E.; Gaughan, Monica; Hume, Robert; Moore, S. Gordon
2012-01-01
There are many approaches to solving the problem of underrepresentation of some racial and ethnic groups and women in scientific and technical disciplines. Here, the authors evaluate the association of a summer bridge program with the graduation rate of underrepresented minority (URM) students at a selective technical university. They demonstrate that this 5-week program prior to the fall of the 1st year contains elements reported as vital for successful student retention. Using multivariable survival analysis, they show that for URM students entering as fall-semester freshmen, relative to their nonparticipating peers, participation in this accelerated summer bridge program is associated with higher likelihood of graduation. The longitudinal panel data include more than 2,200 URM students. PMID:23136456
NASA Astrophysics Data System (ADS)
Reisel, John R.; Jablonski, Marissa; Hosseini, Hossein; Munson, Ethan
2012-06-01
A summer bridge program for incoming engineering and computer science freshmen has been used at the University of Wisconsin-Milwaukee from 2007 to 2010. The primary purpose of this program has been to improve the mathematics course placement for incoming students who initially place into a course below Calculus I on the math placement examination. The students retake the university's math placement examination after completing the bridge program to determine if they then place into a higher-level mathematics course. If the students improve their math placement, the program is considered successful for that student. The math portion of the bridge program is designed around using the ALEKS software package for targeted, self-guided learning. In the 2007 and 2008 versions of the program, both an on-line version and an on-campus version with additional instruction were offered. In 2009 and 2010, the program was exclusively in an on-campus format, and also featured a required residential component and additional engineering activities for the students. From the results of these four programs, we are able to evaluate the success of the program in its different formats. In addition, data has been collected and analysed regarding the impact of other factors on the program's success. The factors include student preparation before the beginning of the program (as measured by math ACT scores) and the amount of time the student spent working on the material during the program. Better math preparation and the amount of time spent on the program were found to be good indicators of success. Furthermore, the on-campus version of the program is more effective than the on-line version.
Code of Federal Regulations, 2011 CFR
2011-04-01
... bridge if the Indian Tribe does not support the project? 661.59 Section 661.59 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.59 What should be done with a deficient BIA owned IRR bridge if the Indian Tribe does not...
Performance of a Press-Lam bridge : a 5-year load-testing and monitoring program
D. S. Gromala; R. C. Moody; M. M. Sprinkel
1985-01-01
This paper summarizes the results of load tests on an experimental highway bridge erected and put into service on the George Washington National Forest in Virginia in 1977. The bridge, made entirely of Press-Lam, a laminated veneer lumber (LVL) product, was load tested 1 month, 1 year, and 5 years after erection. The bridge continues to perform quite well and,...
Code of Federal Regulations, 2010 CFR
2010-04-01
... bridge if the Indian Tribe does not support the project? 661.59 Section 661.59 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.59 What should be done with a deficient BIA owned IRR bridge if the Indian Tribe does not...
DOT National Transportation Integrated Search
2010-12-01
As part of a national experiment sponsored by the FHWA under the Innovative Bridge Research and Construction (IBRC) : program, CDOT used self-consolidating concrete (SCC) to construct abutments, piers, and retaining walls on a bridge : replacement pr...
Development of a database for Louisiana highway bridge scour data : a program and manual.
DOT National Transportation Integrated Search
1999-10-01
A tremendous amount of scour data already exists for the highway bridges monitored by the Louisiana Department of Transportation and Development (DOTD). More than one hundred and twenty bridges are being monitored at a frequency of one to several tim...
Virtual Bridge Design Challenge
ERIC Educational Resources Information Center
Mitts, Charles R.
2013-01-01
This design/problem-solving activity challenges students to design a replacement bridge for one that has been designated as either structurally deficient or functionally obsolete. The Aycock MS Technology/STEM Magnet Program Virtual Bridge Design Challenge is an authentic introduction to the engineering design process. It is a socially relevant…
ERIC Educational Resources Information Center
Stassun, Keivan Guadalupe; Burger, Arnold; Lange, Sheila Edwards
2010-01-01
We describe the Fisk-Vanderbilt Masters-to-PhD Bridge program as a successful model for effective partnerships with minority-serving institutions toward significantly broadening the participation of underrepresented groups in the physical sciences. The program couples targeted recruitment with active retention strategies, and is built upon a…
ERIC Educational Resources Information Center
Suzuki, Anne; Amrein-Beardsley, Audrey; Perry, Nancy J.
2012-01-01
This quasi-experimental, action-research study explored a five-week pre-enrollment initiative called the Pathways Summer Bridge (PSB) Program in the New College of Interdisciplinary Arts and Sciences at Arizona State University (ASU). Theoretically framed and developed using the six components of Tinto's (1993) longitudinal model of institutional…
ERIC Educational Resources Information Center
McCoy, Dorian L.; Winkle-Wagner, Rachelle
2015-01-01
This multisite case study explored the role of summer institutes in preparing Students of Color for doctoral programs. Bourdieu's social reproduction theory, particularly the concept of habitus, was employed as a theoretical framework to investigate how the participants further developed habitus (their dispositions, identities, and perspectives)…
DOT National Transportation Integrated Search
2016-07-01
The deterioration of bridge decks has been identified as a major problem in Indiana. The primary cause of this deterioration is salt water : ingress from the application of deicing salts during the winter. Deicing chemicals placed on the road mix wit...
Arts Impact: Lessons from ArtsBridge
ERIC Educational Resources Information Center
Shimshon-Santo, Amy R.
2010-01-01
Arts Impact summarizes lessons learned at the ArtsBridge Program. It is informed by in-depth participant observation, logic modeling, and quantitative evaluation of program impact on K-12 students in inner city schools and arts students at the University of California Los Angeles over a two year period. The case study frames its analysis through a…
NASA Astrophysics Data System (ADS)
Hidayat, Irpan; Suangga, Made; Reshki Maulana, Moh
2017-12-01
Serviceability of a bridge will decrease based on the function of time. Most likely due to the cyclic load from the traffic. The indicators which can be measured to determine the serviceability is the deflection of the girder. In this research, the PCI-Girder and vehicle load are analyzed by using the finite element method (Midas/Civil) Program. For comparison, the running vehicle test to the bridge has been conducted where the bridge deflections are measured using LVDT sensors on PCI-Girder Bridge. To find the effect of vehicle distance to the LVDV position, the running vehicle goes through on several lanes. The finite element program (Midas/Civil) gives relatively similar result to the measured deflection using LVDT sensors. However, when the vehicle load is situated far from the sensor, the result from both analysis showed significant differences.
"Cooking the books"--behavior-based safety at the San Francisco Bay Bridge.
Brown, Garrett D; Barab, Jordan
2007-01-01
Practitioners of Behavior-Based Safety (BBS) claim dramatic reductions in worker injuries and illnesses through modifying workers' "unsafe behaviors." This case study of a BBS program implemented by KFM, a giant construction consortium rebuilding the eastern span of the San Francisco Bay Bridge in California, documents how BBS was used to suppress reporting of worker injuries and illnesses on site. The key elements of KFM's BBS "injury prevention" strategy included: 1) cash incentives to workers and supervisors who do not report injuries; 2) reprisals and threats of reprisals against those employees who do report injuries; 3) selection and use of employer friendly occupational health clinics and workers compensation insurance administrators; 4) strict limits on the activities of contract industrial hygiene consultants; and 5) a secretive management committee that decides whether reported injuries and illnesses are legitimate and recordable. KFM reported injury and illness rates 55% to 72% lower than other bridge builders in the Bay Area, but the California Division of Occupational Safety and Health (Cal/OSHA) issued Willful citations to the consortium in June 2006 for failing to record 13 worker injuries on its "OSHA Log 300," as required by law.
Towards a robust assessment of bridge clogging processes in flood risk management
NASA Astrophysics Data System (ADS)
Gschnitzer, T.; Gems, B.; Mazzorana, B.; Aufleger, M.
2017-02-01
River managers are aware that wood-clogging mechanisms frequently trigger damage-causing processes like structural damages at bridges, sudden channel outbursts, and occasionally, major displacements of the water course. To successfully mitigate flood risks related to the transport of large wood (LW), river managers need a guideline for an accurate and reliable risk assessment procedure and the design of river sections and bridges that are endangered of LW clogging. In recent years, comprehensive research dealing with the triggers of wood-clogging mechanisms at bridges and the corresponding impacts on flood risk was accomplished at the University of Innsbruck. A large set of laboratory experiments in a rectangular flume was conducted. In this paper we provide an overall view of these tests and present our findings. By applying a logistic regression analysis, the available knowledge on the influence of geometrical, hydraulic, and wood-related parameters on LW clogging probabilities is processed in a generalized form. Based on the experimental modeling results a practice-oriented guideline that supports the assessment of flood risk induced by LW clogging, is presented. In this context, two specific local structural protection measures at the bridge, aiming for a significant decrease of the entrapment probabilities, are illustrated: (i) a deflecting baffle installed on the upstream face of the bridge and (ii) a channel constriction leading to a change in flow state and a corresponding increase of the flow velocities and the freeboard at the bridge cross section. The presented guideline is based on a three-step approach: estimation of LW potential, entrainment, and transport; clogging scenario at the bridge; and the impact on channel and floodplain hydraulics. For a specific bridge susceptible to potential clogging caused by LW entrapment, it allows for a qualitative evaluation of potential LW entrainment in the upstream river segments, its transport toward the hydraulic bottleneck, and for a quantification of expected entrapment probabilities. Depending on the amount and characteristics of the impacting LW, consequences of bridge clogging can be determined and LW bridge-clogging scenarios can be considered within hydrodynamic numerical modeling.
Dynamics and statics of nonaxisymmetric and symmetric liquid bridges
NASA Technical Reports Server (NTRS)
Alexander, J. Iwan D.; Resnick, Andrew H.; Kaukler, William F.; Zhang, Yiqiang
1994-01-01
This program of theoretical and experimental ground-based research focuses on the understanding of the dynamics and stability limits of nonaxisymmetric and symmetric liquid bridges. There are three basic objectives: First, to determine the stability limits of nonaxisymmetric liquid bridges held between non-coaxial parallel disks, Second, to examine the dynamics of nonaxisymmetric bridges and nonaxisymmetric oscillations of initially axisymmetric bridges. The third objective is to experimentally investigate the vibration sensitivity of liquid bridges under terrestrial and low gravity conditions. Some of these experiments will require a low gravity environment and the ground-based research will culminate in a definitive flight experiment.
DOT National Transportation Integrated Search
2009-04-13
Side-by-side box-beam bridge constitutes approximately 17 percent of bridges built or replaced annually on : public roads and there is a renewed thrust to use this bridge type for rapid construction under the Highway for : LIFE program. Further, fail...
DOT National Transportation Integrated Search
2009-04-13
Side-by-side box-beam bridge constitutes approximately 17 percent of bridges built or replaced annually on public roads and there is a renewed thrust to use this bridge type for rapid construction under the Highway for LIFE program. Further, failure ...
23 CFR 650.407 - Application for bridge replacement or rehabilitation.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Application for bridge replacement or rehabilitation... Rehabilitation Program § 650.407 Application for bridge replacement or rehabilitation. (a) Agencies participate... agency for review and processing. The State is responsible for submitting the six computer card format or...
23 CFR 650.407 - Application for bridge replacement or rehabilitation.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Application for bridge replacement or rehabilitation... Rehabilitation Program § 650.407 Application for bridge replacement or rehabilitation. (a) Agencies participate... agency for review and processing. The State is responsible for submitting the six computer card format or...
23 CFR 650.407 - Application for bridge replacement or rehabilitation.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Application for bridge replacement or rehabilitation... Rehabilitation Program § 650.407 Application for bridge replacement or rehabilitation. (a) Agencies participate... agency for review and processing. The State is responsible for submitting the six computer card format or...
SBION: A Program for Analyses of Salt-Bridges from Multiple Structure Files.
Gupta, Parth Sarthi Sen; Mondal, Sudipta; Mondal, Buddhadev; Islam, Rifat Nawaz Ul; Banerjee, Shyamashree; Bandyopadhyay, Amal K
2014-01-01
Salt-bridge and network salt-bridge are specific electrostatic interactions that contribute to the overall stability of proteins. In hierarchical protein folding model, these interactions play crucial role in nucleation process. The advent and growth of protein structure database and its availability in public domain made an urgent need for context dependent rapid analysis of salt-bridges. While these analyses on single protein is cumbersome and time-consuming, batch analyses need efficient software for rapid topological scan of a large number of protein for extracting details on (i) fraction of salt-bridge residues (acidic and basic). (ii) Chain specific intra-molecular salt-bridges, (iii) inter-molecular salt-bridges (protein-protein interactions) in all possible binary combinations (iv) network salt-bridges and (v) secondary structure distribution of salt-bridge residues. To the best of our knowledge, such efficient software is not available in public domain. At this juncture, we have developed a program i.e. SBION which can perform all the above mentioned computations for any number of protein with any number of chain at any given distance of ion-pair. It is highly efficient, fast, error-free and user friendly. Finally we would say that our SBION indeed possesses potential for applications in the field of structural and comparative bioinformatics studies. SBION is freely available for non-commercial/academic institutions on formal request to the corresponding author (akbanerjee@biotech.buruniv.ac.in).
A Real Options Approach to Quantity and Cost Optimization for Lifetime and Bridge Buys of Parts
2015-12-01
Optimization for Lifetime and Bridge Buys of Parts By: Peter Sandborn and Navid Goudarzi 18 56 U N IV ERSITY O F M A R Y L A N D UMD-LM-16-011 Electronic...and bridge buys, which are used to manage part discontinuance (i.e., obsolescence) during the support of critical systems are simple in concept, the...valuate lifetime and bridge buys and to determine the optimum part quantity for a lifetime or bridge buy. The approach accommodates uncertainties in
Key Performance Indicators in Radiology: You Can't Manage What You Can't Measure.
Harvey, H Benjamin; Hassanzadeh, Elmira; Aran, Shima; Rosenthal, Daniel I; Thrall, James H; Abujudeh, Hani H
2016-01-01
Quality assurance (QA) is a fundamental component of every successful radiology operation. A radiology QA program must be able to efficiently and effectively monitor and respond to quality problems. However, as radiology QA has expanded into the depths of radiology operations, the task of defining and measuring quality has become more difficult. Key performance indicators (KPIs) are highly valuable data points and measurement tools that can be used to monitor and evaluate the quality of services provided by a radiology operation. As such, KPIs empower a radiology QA program to bridge normative understandings of health care quality with on-the-ground quality management. This review introduces the importance of KPIs in health care QA, a framework for structuring KPIs, a method to identify and tailor KPIs, and strategies to analyze and communicate KPI data that would drive process improvement. Adopting a KPI-driven QA program is both good for patient care and allows a radiology operation to demonstrate measurable value to other health care stakeholders. Copyright © 2015 Mosby, Inc. All rights reserved.
1998-12-18
Donald McMonagle (left), manager, Launch Integration, speaks to federal and state elected officials during the ground breaking ceremony for a multi-purpose hangar, phase one of the Reusable Launch Vehicle (RLV) Support Complex to be built near the Shuttle Landing Facility. At right are Center Director Roy Bridges and Executive Director of the Spaceport Florida Authority (SFA) Ed O'Connor. The new complex is jointly funded by SFA, NASA's Space Shuttle Program and Kennedy Space Center. It is intended to support the Space Shuttle and other RLV land X-vehicle systems. Completion is expected by the year 2000
Passing the Torch: Preparing Teaching Artists through a First-Year ArtsBridge Program
ERIC Educational Resources Information Center
Kaufmann, Karen A.
2007-01-01
During spring, 2005 The University of Montana, Department of Drama/Dance successfully piloted a small ArtsBridge Program through a new service-learning course for advanced dance and drama students. This article describes the process of setting up the university-public school partnership; describes challenges to faculty, staff, scholars and host…
The Bridge Project: Connecting Home, School, and Community for Mexican Immigrant Children
ERIC Educational Resources Information Center
McElvain, Cheryl Marie
2015-01-01
This study examines the academic and psychosocial effects of the Bridge Project after-school program on 25 prekindergarten through 6th-grade English language learner Mexican immigrant children and their families living in an affordable housing complex in the San Francisco Bay Area. The results of the study show that the program increased the…
ERIC Educational Resources Information Center
Hall, Jeffrey D.
2011-01-01
The purpose of this study was to advance understanding of self-directed learning characteristics of first-year, first-generation college students participating in a summer bridge program. Understanding the experience of these students in higher education can lead to the development of programmatic and pedagogical strategies to better meet the…
Predictors of Attrition and Achievement in a Tertiary Bridging Program
ERIC Educational Resources Information Center
Whannell, Robert
2013-01-01
This study examines the attrition and achievement of a sample of 295 students in an on-campus tertiary bridging program at a regional university. A logistic regression analysis using enrolment status, age and the number of absences from scheduled classes at week three of the semester as predictor variables correctly predicted 92.8 percent of…
Maragliano-Muniz, Pamela
2013-10-01
Following the introduction of CAMBRA (Caries Management by Risk Assessment) in 2007, a number of recommendations for office protocols were introduced, and many companies have formulated products and procedures for implementing CAMBRA. As a result, the implementation of a caries management program can be confounding and overwhelming to a dental practitioner. Understanding risk factors as they contribute to the caries process can help mitigate confusion and guide the practitioner when selecting materials for their practice. Ultimately, knowing how the risk factors play a role in the progression of dental caries will lead to appropriate risk management and product recommendations. The purpose of this article is to discuss the contribution of risk factors to the caries process and to introduce strategies that restorative dentists can utilize to minimize caries risk.
NASA Astrophysics Data System (ADS)
Flanigan, Katherine A.; Johnson, Nephi R.; Hou, Rui; Ettouney, Mohammed; Lynch, Jerome P.
2017-04-01
The ability to quantitatively assess the condition of railroad bridges facilitates objective evaluation of their robustness in the face of hazard events. Of particular importance is the need to assess the condition of railroad bridges in networks that are exposed to multiple hazards. Data collected from structural health monitoring (SHM) can be used to better maintain a structure by prompting preventative (rather than reactive) maintenance strategies and supplying quantitative information to aid in recovery. To that end, a wireless monitoring system is validated and installed on the Harahan Bridge which is a hundred-year-old long-span railroad truss bridge that crosses the Mississippi River near Memphis, TN. This bridge is exposed to multiple hazards including scour, vehicle/barge impact, seismic activity, and aging. The instrumented sensing system targets non-redundant structural components and areas of the truss and floor system that bridge managers are most concerned about based on previous inspections and structural analysis. This paper details the monitoring system and the analytical method for the assessment of bridge condition based on automated data-driven analyses. Two primary objectives of monitoring the system performance are discussed: 1) monitoring fatigue accumulation in critical tensile truss elements; and 2) monitoring the reliability index values associated with sub-system limit states of these members. Moreover, since the reliability index is a scalar indicator of the safety of components, quantifiable condition assessment can be used as an objective metric so that bridge owners can make informed damage mitigation strategies and optimize resource management on single bridge or network levels.
CAMPARE and Cal-Bridge: Two Institutional Networks Increasing Diversity in Astronomy
NASA Astrophysics Data System (ADS)
Rudolph, Alexander L.; Impey, Chris David; Phillips, Cynthia B.; Povich, Matthew S.; Prather, Edward E.; Smecker-Hane, Tammy A.
2015-01-01
We describe two programs, CAMPARE and Cal-Bridge, with the common mission of increasing participation of groups traditionally underrepresented in astronomy, particularly underrepresented minorities and women, through summer research opportunities, in the case of CAMPARE, scholarships in the case of Cal-Bridge, and significant mentoring in both programs, leading to an increase in their numbers successfully pursuing a PhD in the field.CAMPARE is an innovative REU-like summer research program, currently in its sixth year, comprising a network of comprehensive universities and community colleges in Southern California and Arizona (most of which are minority serving institutions), and ten major research institutions (University of Arizona Steward Observatory, the SETI Institute, JPL, Caltech, and the five Southern California UC campuses, UCLA, UCI, UCSD, UCR, and UCSB).In its first five summers, CAMPARE sent a total of 49 students from 10 different CSU and community college campuses to 5 research sites of the program. Of these 49 participants, 25 are women and 24 are men; 22 are Hispanic, 4 are African American, and 1 is Native American, including 6 female Hispanic and 2 female African-American participants. Twenty-one (21) CAMPARE participants have graduated from college, and more than half (11) have attended or are attending a graduate program, including 8 enrolled in PhD or Master's-to-PhD programs. Over twenty CAMPARE students have presented at the AAS and other national meetings.The Cal-Bridge program is a diverse network of higher education institutions in Southern California, including 5 UC campuses, 8 CSU campuses, and 7 community colleges dedicated to the goal of increasing the number of underrepresented minority and female students attending graduate school in astronomy or related fields. We have recently selected our inaugural group of five 2014 Cal-Bridge Scholars, including four women (two Hispanic and one part Native American), and one Hispanic man.Once selected, the Cal-Bridge Scholars benefit from three years of financial support, intensive, joint mentoring by CSU and UC faculty, professional development workshops, and exposure to research opportunities at the participating UC campuses.
CAMPARE and Cal-Bridge: Two Institutional Networks Increasing Diversity in Astronomy
NASA Astrophysics Data System (ADS)
Rudolph, Alexander L.; Impey, Chris David; Phillips, Cynthia B.; Povich, Matthew S.; Prather, Edward E.; Smecker-Hane, Tammy A.
2015-01-01
We describe two programs, CAMPARE and Cal-Bridge, with the common mission of increasing participation of groups traditionally underrepresented in astronomy, particularly underrepresented minorities and women, through summer research opportunities, in the case of CAMPARE, scholarships in the case of Cal-Bridge, and significant mentoring in both programs, leading to an increase in their numbers successfully pursuing a PhD in the field.CAMPARE is an innovative REU-like summer research program, currently in its sixth year, comprising a network of comprehensive universities and community colleges in Southern California and Arizona (most of which are minority serving institutions), and ten major research institutions (University of Arizona Steward Observatory, the SETI Institute, JPL, Caltech, and the five Southern California UC campuses, UCLA, UCI, UCSD, UCR, and UCSB).In its first five summers, CAMPARE sent a total of 49 students from 10 different CSU and community college campuses to 5 research sites of the program. Of these 49 participants, 25 are women and 24 are men; 22 are Hispanic, 4 are African American, and 1 is Native American, including 6 female Hispanic and 2 female African-American participants. Twenty-one (21) CAMPARE participants have graduated from college, and more than half (11) have attended or are attending a graduate program, including 8 enrolled in PhD or Master's-to-PhD programs. Over twenty CAMPARE students have presented at the AAS and other national meetings.The Cal-Bridge program is a diverse network of higher education institutions in Southern California, including 5 UC campuses, 8 CSU campuses, and 7 community colleges dedicated to the goal of increasing the number of underrepresented minority and female students attending graduate school in astronomy or related fields. We have recently selected our inaugural group of five 2014 Cal-Bridge Scholars, including four women (two Hispanic and one part Native American), and one Hispanic man.Once selected, Cal-Bridge Scholars benefit from financial support, intensive, joint mentoring by CSU and UC faculty, professional development workshops, and exposure to research opportunities at the participating UC campuses.
Deterioration and cost information for bridge management.
DOT National Transportation Integrated Search
2012-05-01
This study applies contract bid tabulations and elementlevel condition records to develop elementlevel actions, : costs for actions, transition probabilities for models of deterioration of bridge elements, and transition probabilities : for imp...
Code of Federal Regulations, 2012 CFR
2012-10-01
... conduct regular evaluations of railroad bridge inspection and management practices. The objective of these... condition, and the stresses imposed in those members by the service loads. (c) The factors which were used... provided: (i) The condition of the bridge has not changed significantly; and (ii) The stresses resulting...
DOT National Transportation Integrated Search
2013-12-01
The replacement of the US Grant Bridge over the Ohio River in Portsmouth, OH, was initiated in : 2001 when the original bridge was closed and demolished, and its substitute opened in 2006. The : new design is a steel cable stay design with steel gird...
Stability limits and dynamics of nonaxisymmetric liquid bridges
NASA Technical Reports Server (NTRS)
Alexander, J. Iwan D.; Resnik, Andy; Kaukler, William F.
1993-01-01
This program of theoretical and experimental ground-based and low gravity research is focussed on the understanding of the dynamics and stability limits of nonaxisymmetric liquid bridges. There are three basic objectives to the proposed work: (1) to determine the stability limits of nonaxisymmetric liquid bridges held between non-coaxially aligned disks; (2) to examine the dynamics of nonaxisymmetric bridges and nonaxisymmetric oscillations of initially axisymmetric bridges (some of these experiments require a low gravity environment and the ground-based research will culminate in a definitive flight experiment); and (3) to experimentally investigate the vibration sensitivity of liquid bridges under terrestrial and low gravity conditions.
NASA Astrophysics Data System (ADS)
Stassun, Keivan G.
2006-12-01
We describe the Fisk-Vanderbilt Masters-to-PhD Bridge program as a successful model for effective partnerships with minority-serving institutions toward significantly broadening the participation of underrepresented groups in the physical sciences. The program couples targeted recruitment with active retention strategies, and is built upon a clearly defined structure that is flexible enough to address individual student needs while maintaining clearly communicated baseline standards for student performance. A key precept of the program’s philosophy is to eliminate passivity in student mentoring; students are deliberately groomed to successfully transition into the PhD program through active involvement in research experiences with future PhD advisers, coursework that demonstrates competency in core PhD subject areas, and frequent interactions with joint mentoring committees. This approach allows student progress and performance to be monitored and evaluated in a more holistic manner than usually afforded by limited metrics such as standardized tests. Since its inception in 2004, the program has attracted a total of 18 underrepresented students, with a retention rate of 90%. Recent research indicates that minority students are nearly twice as likely as non-minority students to seek a Masters degree en route to the PhD. In essence, the Bridge program described here builds upon this increasingly important pathway, with a dedicated mentoring process designed to ensure that the Masters-to-PhD transition is a successful one.
Wagner, Chad R.; Fitzgerald, Sharon A.; Sherrell, Roy D.; Harned, Douglas A.; Staub, Erik L.; Pointer, Brian H.; Wehmeyer, Loren L.
2011-01-01
In 2008, the North Carolina General Assembly passed House Bill 2436 that required the North Carolina Department of Transportation (NCDOT) to study the water-quality effects of bridges on receiving streams. In response, the NCDOT and the U.S. Geological Survey (USGS) collaborated on a study to provide information necessary to address the requirements of the Bill. To better understand the effects of stormwater runoff from bridges on receiving streams, the following tasks were performed: (1) characterize stormwater runoff quality and quantity from a representative selection of bridges in North Carolina; (2) measure stream water quality upstream from selected bridges to compare bridge deck stormwater concentrations and loads to stream constituent concentrations and loads; and (3) determine if the chemistry of bed sediments upstream and downstream from selected bridges differs substantially based on presence or absence of a best management practice for bridge runoff.
CryoTran user's manual, version 1.0
NASA Technical Reports Server (NTRS)
Cowgill, Glenn R.; Chato, David J.; Saad, Ehab
1989-01-01
The development of cryogenic fluid management systems for space operation is a major portion of the efforts of the Cryogenic Fluids Technology Office (CFTO) at the NASA Lewis Research Center. Analytical models are a necessary part of experimental programs which are used to verify the results of experiments and are also used as a predictor for parametric studies. The CryoTran computer program is a bridge to obtain analytical results. The object of CryoTran is to coordinate these separate analyses into an integrated framework with a user-friendly interface and a common cryogenic property database. CryoTran is an integrated software system designed to help solve a diverse set of problems involving cryogenic fluid storage and transfer in both ground and low-g environments.
SARS: Safeguards Accounting and Reporting Software
NASA Astrophysics Data System (ADS)
Mohammedi, B.; Saadi, S.; Ait-Mohamed, S.
In order to satisfy the requirements of the SSAC (State System for Accounting and Control of nuclear materials), for recording and reporting objectives; this computer program comes to bridge the gape between nuclear facilities operators and national inspection verifying records and delivering reports. The SARS maintains and generates at-facility safeguards accounting records and generates International Atomic Energy Agency (IAEA) safeguards reports based on accounting data input by the user at any nuclear facility. A database structure is built and BORLAND DELPHI programming language has been used. The software is designed to be user-friendly, to make extensive and flexible management of menus and graphs. SARS functions include basic physical inventory tacking, transaction histories and reporting. Access controls are made by different passwords.
Life-cycle assessment of Nebraska bridges.
DOT National Transportation Integrated Search
2013-05-01
Life-cycle cost analysis (LCCA) is a necessary component in bridge management systems (BMSs) for : assessing investment decisions and identifying the most cost-effective improvement alternatives. The : LCCA helps to identify the lowest cost alternati...
ERIC Educational Resources Information Center
Mitchell, Claire E.; Alozie, Nonye M.; Wathington, Heather D.
2015-01-01
This study examines whether community college developmental summer bridge programs (DSBPs) can help students acquire the academic and college knowledge needed to attend and succeed at a four-year higher education institution. In-depth interviews with 14 participants at nine four-year institutions in Texas were conducted two years after their…
From Literature to Literacy: Bridging Learning in the Library and the Primary Grade Classroom.
ERIC Educational Resources Information Center
Moss, Joy F.; Fenster, Marilyn F.
This book is the product of a collaborative partnership between the two authors to develop a year-long literary/literacy program for first grade children based on bridging learning in the library and the classroom. Some of the objectives of the program described in the book are: to provide opportunities for children to experience personal…
ERIC Educational Resources Information Center
Bennett, Troy
2016-01-01
Academic researchers dedicated to contributing to quality improvement in professional practice need to find more effective ways to bridge the gap between research and practice. Bridging the gap requires understanding what encourages the use of research findings by practitioners and what discourages it, as well as understanding how practitioners…
Assessing the Impact of the Three-Year Ohio Teen B.R.I.D.G.E.S. AmeriCorps Program.
ERIC Educational Resources Information Center
Safrit, R. Dale; Schmiesing, Ryan; King, Jeffrey E.; Villard, Judy; Wells, Betty
2003-01-01
Ohio Teen B.R.I.D.G.E.S (Building Responsibility In teen Drivers through Growth in self-Esteem and Safety) was evaluated using 12 focus groups. Program impacts included heightened awareness of vehicular safety issues among teens and communities, enhanced public speaking for youth volunteers, and meaningful leadership and volunteer opportunities…
ERIC Educational Resources Information Center
Biermeier, Chadwick
2017-01-01
This study was an examination of the minority student retention rate in a year-long bridge program. The retention rate of these students is 25%. University administration was concerned about the retention rate and its impact on future enrollment. Using Jack Mezirow's transformative learning as a framework of understanding, the purpose of this…
ERIC Educational Resources Information Center
Basgier, Christopher
2017-01-01
To illustrate how genre pedagogy and public writing pedagogy can inform one another, this program profile describes the second-semester composition course at University of North Dakota, ENGL 130: College Composition II: Writing for Public Audiences. In this course, genre works as a rhetorical bridge across an interlinked sequence of research,…
High performance concrete bridges
DOT National Transportation Integrated Search
2000-08-01
This compilation of FHWA reports focuses on high performance concrete bridges. High performance concrete is described as concrete with enhanced durability and strength characteristics. Under the Strategic Highway Research Program (SHRP), more than 40...
Overview of the national historic covered bridge preservation (NHCBP) program
James P. Wacker; Sheila Rimal Duwadi
2010-01-01
Covered wooden bridges proliferated in the United States in the mid-nineteenth century. Today an estimated 800 covered bridge structures remain, but they are nevertheless cherished links to the technological heritage of the United States. The through-truss designs vary from the Kingpost trusses built in the craft tradition to the engineered Burr arch and Paddleford...
ERIC Educational Resources Information Center
Sales, Jessica; Comeau, Dawn; Liddle, Kathleen; Khanna, Nikki; Perrone, Lisa; Palmer, Katrina; Lynn, David
2006-01-01
A new program, On Recent Discoveries by Emory Researchers (ORDER), has been developed as a bridge across the ever-widening gap between graduate and undergraduate education in the sciences. This bridge is created by merging the needs of graduate/postdoctoral students to educate more interdisciplinary scholars about their research discoveries with…
The Case for Summer Bridge: Building Social and Cultural Capital for Talented Black STEM Students
ERIC Educational Resources Information Center
Stolle-McAllister, Kathleen
2011-01-01
This study uses focus groups to examine the importance of a pre-college summer bridge program for highly talented black students in science, technology, engineering, and mathematics (STEM). Longitudinal data were collected from 134 participants who identified three aspects of Summer Bridge that were particularly helpful: academic, social, and…
Invited Article: Bridging the Gap--Supporting the Transition from High School to College
ERIC Educational Resources Information Center
Frischmann, Julie A.; Moor, Kelly S.
2017-01-01
Idaho State University's Bengal Bridge is a summer program designed to help students successfully transition from high school to their first year of college at Idaho State University. All Bridge students at ISU take two general education courses, plus an additional credit of supplemental instruction focused on academic strategies specific to the…
Marine ARM GPCI Investigation of Clouds Bridge Display Field Campaign Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reynolds, R. Michael; Lewis, Ernie
2016-09-01
At the beginning of the U.S. Department of Energy (DOE) Marine Atmospheric Radiation Measurement (ARM) Climate Research Facility Global Energy and Water Experiment (GEWEX) Cloud System Study (GCSS) Pacific Cross-Section Intercomparison (GPCI) Investigation of Clouds (MAGIC) experiment, we recognized that the crew on the ship’s bridge would like to see a display of the meteorological data that was being collected. While a display on the bridge would be marginally useful to the science, it was decided to make a display for the bridge. A display was programmed in Lab View and a personal computer (PC) was set up in themore » bridge. This remained in operation until the ship went to dry dock for upgrades and service. Part of the upgrade was a new meteorological system for the ship. After this time there was no need for the ARM display and so it was not re-installed for the remainder of the program.« less
Stream Stability and Scour Assessments at Bridges in Massachusetts
Parker, Gene W.; Bratton, Lisa; Armstrong, David S.
1997-01-01
In 1989, the Federal Highway Administration mandated that every state establish a program to evaluate the vulnerability to floods of all bridges over water. The Massachusetts Highway Department entered into a cooperative effort with the U.S. Geological Survey to comply with this mandate. Geomorphic and hydraulic characteristics were collected and were used to assess the processes that affect stream stability and current scour problems and potential near 2,361 bridge sites in Massachusetts. As a result of these assessments, the Massachusetts Highway Department will prioritize the bridge inventory for action regarding scour safety. A data base was prepared that includes the geomorphic and hydraulic data collected during field assessments. In addition to the data base, this report includes the historical development of the bridge scour program, the methods used for data collection during assessments, the methods used for quality assurance and quality control, and how the data base was digitally formatted to be presented on a CD-ROM. A user's guide provides assistance in the use of this electronic data base and report.
Concrete bridge deck early problem detection and mitigation using robotics
NASA Astrophysics Data System (ADS)
Gucunski, Nenad; Yi, Jingang; Basily, Basily; Duong, Trung; Kim, Jinyoung; Balaguru, Perumalsamy; Parvardeh, Hooman; Maher, Ali; Najm, Husam
2015-04-01
More economical management of bridges can be achieved through early problem detection and mitigation. The paper describes development and implementation of two fully automated (robotic) systems for nondestructive evaluation (NDE) and minimally invasive rehabilitation of concrete bridge decks. The NDE system named RABIT was developed with the support from Federal Highway Administration (FHWA). It implements multiple NDE technologies, namely: electrical resistivity (ER), impact echo (IE), ground-penetrating radar (GPR), and ultrasonic surface waves (USW). In addition, the system utilizes advanced vision to substitute traditional visual inspection. The RABIT system collects data at significantly higher speeds than it is done using traditional NDE equipment. The associated platform for the enhanced interpretation of condition assessment in concrete bridge decks utilizes data integration, fusion, and deterioration and defect visualization. The interpretation and visualization platform specifically addresses data integration and fusion from the four NDE technologies. The data visualization platform facilitates an intuitive presentation of the main deterioration due to: corrosion, delamination, and concrete degradation, by integrating NDE survey results and high resolution deck surface imaging. The rehabilitation robotic system was developed with the support from National Institute of Standards and Technology-Technology Innovation Program (NIST-TIP). The system utilizes advanced robotics and novel materials to repair problems in concrete decks, primarily early stage delamination and internal cracking, using a minimally invasive approach. Since both systems use global positioning systems for navigation, some of the current efforts concentrate on their coordination for the most effective joint evaluation and rehabilitation.
Gamboa-Maldonado, Thelma; Marshak, Helen Hopp; Sinclair, Ryan; Montgomery, Susanne; Dyjack, David T
2012-09-01
Partnerships among local public environmental health (EH), emergency preparedness and response (EPR) programs, and the communities they serve have great potential to build community environmental health emergency preparedness (EHEP) capacity. In the study described in this article, the beliefs and organizational practices pertaining to community EHEP outreach and capacity were explored through key informant (KI) interviews (N = 14) with a sample of governmental EH and EPR administrators and top-level managers from Riverside and San Bernardino counties in Southern California. The results indicate that KIs were highly confident in their workforces' efficacy, ability, willingness, and motivation to directly engage local communities in EHEP. Best practices to combat organizational and systematic barriers to community EHEP outreach were identified. Based on the authors' results, training in participatory methods is needed to bridge technical knowledge in emergency management to daily practice. The lessons learned will form the basis of future interventions aimed to prepare EH and EPR professions to implement community-focused emergency preparedness strategies.
A programmatic approach to long-term bridge preventive maintenance.
DOT National Transportation Integrated Search
2016-04-15
State transportation agencies use cost-effective preventive maintenance (PM) programs to preserve existing roadway systems, slow down their deterioration, and improve their functional condition. Currently, KYTCs bridge inventory includes approxima...
Preventative maintenance program for bridges.
DOT National Transportation Integrated Search
2015-07-01
The Kentucky Transportation Cabinets (KYTC) bridge inventory is rapidly aging. As such, the Cabinet : needs to identify and implement relevant preventative maintenance (PM) actions to extend the useful : service lives of those structures. Maintena...
Hillsboro Canal bridge monitoring.
DOT National Transportation Integrated Search
2011-12-01
This report describes the implementation of a testing and monitoring program for bridge 930338 in Belle Glade. Glass-fiber : reinforced polymer (GFRP) deck panels and plates were installed over an existing steel superstructure using grouted steel : s...
A programmatic approach to long-term bridge preventive maintenance : final report.
DOT National Transportation Integrated Search
2016-04-01
State transportation agencies use cost-effective preventive maintenance (PM) programs to preserve existing roadway systems, slow down their deterioration, and improve their functional condition. Currently, KYTCs bridge inventory includes approxima...
Identification of damping in a bridge using a moving instrumented vehicle
NASA Astrophysics Data System (ADS)
González, A.; OBrien, E. J.; McGetrick, P. J.
2012-08-01
In recent years, there has been a significant increase in the number of bridges which are being instrumented and monitored on an ongoing basis. This is in part due to the introduction of bridge management systems designed to provide a high level of protection to the public and early warning if the bridge becomes unsafe. This paper investigates a novel alternative; a low-cost method consisting of the use of a vehicle fitted with accelerometers on its axles to monitor the dynamic behaviour of bridges. A simplified half-car vehicle-bridge interaction model is used in theoretical simulations to test the effectiveness of the approach in identifying the damping ratio of the bridge. The method is tested for a range of bridge spans and vehicle velocities using theoretical simulations and the influences of road roughness, initial vibratory condition of the vehicle, signal noise, modelling errors and frequency matching on the accuracy of the results are investigated.
NASA Astrophysics Data System (ADS)
O'Connor, Sean M.; Zhang, Yilan; Lynch, Jerome; Ettouney, Mohammed; van der Linden, Gwen
2014-04-01
A worthy goal for the structural health monitoring field is the creation of a scalable monitoring system architecture that abstracts many of the system details (e.g., sensors, data) from the structure owner with the aim of providing "actionable" information that aids in their decision making process. While a broad array of sensor technologies have emerged, the ability for sensing systems to generate large amounts of data have far outpaced advances in data management and processing. To reverse this trend, this study explores the creation of a cyber-enabled wireless SHM system for highway bridges. The system is designed from the top down by considering the damage mechanisms of concern to bridge owners and then tailoring the sensing and decision support system around those concerns. The enabling element of the proposed system is a powerful data repository system termed SenStore. SenStore is designed to combine sensor data with bridge meta-data (e.g., geometric configuration, material properties, maintenance history, sensor locations, sensor types, inspection history). A wireless sensor network deployed to a bridge autonomously streams its measurement data to SenStore via a 3G cellular connection for storage. SenStore securely exposes the bridge meta- and sensor data to software clients that can process the data to extract information relevant to the decision making process of the bridge owner. To validate the proposed cyber-enable SHM system, the system is implemented on the Telegraph Road Bridge (Monroe, MI). The Telegraph Road Bridge is a traditional steel girder-concrete deck composite bridge located along a heavily travelled corridor in the Detroit metropolitan area. A permanent wireless sensor network has been installed to measure bridge accelerations, strains and temperatures. System identification and damage detection algorithms are created to automatically mine bridge response data stored in SenStore over an 18-month period. Tools like Gaussian Process (GP) regression are used to predict changes in the bridge behavior as a function of environmental parameters. Based on these analyses, pertinent behavioral information relevant to bridge management is autonomously extracted.
Fouad Fanous; Jeremy May; Terry Wipf; Michael Ritter
2011-01-01
Increased use of timber bridges in the U.S. transportation system has required additional research to improve the current design methodology of these bridges. For this reason, the U.S. Forest Service, Forest Products Laboratory (FPL), and the Federal Highway Administration have supported several research programs to attain the objective listed above. This report is a...
ERIC Educational Resources Information Center
Berney, Tomi D.; Adelman, Miriam
The Bilingual Resources for Development of Gainful Employment skills (Project BRIDGES) was a federally-funded program in its second year of a 3-year funding cycle. Project BRIDGES aimed at developing the academic and vocational skills of limited-English-proficient (LEP) students who had failed two or more classes and were at risk of dropping out.…
Final Environmental Assessment, Horse Creek Bridge Replacement
2010-10-01
Final Environmental Assessment Horse Creek Bridge Replacement 78th Civil Engineer Group...Final Environmental Assessment Horse Creek Bridge Replacement 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d...Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 FINDING OF NO SIGNIFICANT IMPACT (FONSI)/ FINDING OF NO PRACTICABLE ALTERNATIVE (FONP A) HORSE
A BRIDGE partnership model for health management education in the Slovak Republic.
West, D J; Krcmery, V; Rusnakova, V; Murgas, M
1998-01-01
An innovative Health Management Education Partnership (HMEP) was initiated to develop management education initiatives through the exchange of information and ideas. Health education efforts, projects and activities exist between the University of Scranton and three strategic partners in the Slovak Republic: Trnava University, the Health Management School and the University of Matej Bel. The BRIDGE model (Building Relationships in Developing and Growing Economies) utilizes several innovative educational initiatives and strategic projects including a professional journal, faculty development, professional development, curriculum development, certification and accreditation, faculty-students exchange and development of educational materials and modules. The BRIDGE organizational structure is reviewed as well as specific workplan objectives to operationalize the HMEP encouraging mutual cooperation, collaboration and sustainability of efforts. The model stresses implementation, monitoring, and evaluation of all initiatives through a strong community effort, focus on research, deployment of educational resources, curriculum modification, development of interpartnership activities, conferences, workshops, fieldwork experiences and study tours. Applied management practices enhance market-oriented solutions to health care delivery problems emphasizing a focus on privatization and entrepreneurship through education.
Quantitative sensing of bridges, railways, and tunnels with autonomous unmanned aerial vehicles.
DOT National Transportation Integrated Search
2017-05-04
Managing a growing population of deteriorated transportation infrastructure : systems (i.e. bridges, railways, tunnels) is one of biggest challenges faced by the nation. : Traditional inspection and monitoring techniques (e.g., visual inspection, mec...
NASA Astrophysics Data System (ADS)
Keener, V. W.; Brewington, L.; Jaspers, K.
2016-12-01
To build an effective bridge from the climate modeling community to natural resource managers, we assessed the existing landscape to see where different groups diverge in their perceptions of climate data and needs. An understanding of a given community's shared knowledge and differences can help design more actionable science. Resource managers in Hawaii are eager to have future climate projections at spatial scales relevant to the islands. National initiatives to downscale climate data often exclude US insular regions, so researchers in Hawaii have generated regional dynamically and statistically downscaled projections. Projections of precipitation diverge, however, leading to difficulties in communication and use. Recently, a two day workshop was held with scientists and managers to evaluate available models and determine a set of best practices for moving forward with decision-relevant downscaling in Hawaii. To seed the discussion, the Pacific Regional Integrated Sciences and Assessments (RISA) program conducted a pre-workshop survey (N=65) of climate modelers and freshwater, ecosystem, and wildfire managers working in Hawaii. Scientists reported spending less than half of their time on operational research, although the majority was eager to partner with managers on specific projects. Resource managers had varying levels of familiarity with downscaled climate projections, but reported needing more information about uncertainty for decision making, and were less interested in the technical model details. There were large differences between groups of managers, with 41.7% of freshwater managers reporting that they used climate projections regularly, while a majority of ecosystem and wildfire managers reported having "no familiarity". Scientists and managers rated which spatial and temporal scales were most relevant to decision making. Finally, when asked to compare how confident they were in projections of specific climate variables between the dynamical and statistical data, 80-90% of managers responded that they had no opinion. Workshop attendees were very interested in the survey results, adding to evidence of a need for sustained engagement between modeler and user groups, as well as different strategies for working with different types of resource managers.
CIM's bridge from CADD to CAM: Data management requirements for manufacturing engineering
NASA Technical Reports Server (NTRS)
Ford, S. J.
1984-01-01
Manufacturing engineering represents the crossroads of technical data management in a Computer Integrated Manufacturing (CIM) environment. Process planning, numerical control programming and tool design are the key functions which translate information from as engineered to as assembled. In order to transition data from engineering to manufacturing, it is necessary to introduce a series of product interpretations which contain an interim introduction of technical parameters. The current automation of the product definition and the production process places manufacturing engineering in the center of CAD/CAM with the responsibility of communicating design data to the factory floor via a manufacturing model of the data. A close look at data management requirements for manufacturing engineering is necessary in order to establish the overall specifications for CADD output, CAM input, and CIM integration. The functions and issues associated with the orderly evolution of computer aided engineering and manufacturing are examined.
The Cal-Bridge Program: Supporting Diverse Graduate Students in Astrophysics
NASA Astrophysics Data System (ADS)
Smecker-Hane, Tammy A.; Rudolph, Alexander L.; Abazajian, Kevork; Povich, Matthew S.
2018-06-01
The mission of the Cal-Bridge program is to increase the number of underrepresented minority and women students completing a bachelor’s degree and entering a PhD program in astronomy, physics, or closely-related fields. To do so, we have built a network of faculty at diverse higher education institutions, including University of California (UC) campuses, California State Universities (CSUs), and community colleges dedicated to this goal. Students selected for our program are known as Cal-Bridge Scholars, and we give them a wide variety of support: (1) financial scholarships in their junior/senior years at CSU and their first year of graduate school at a UC, (2) intensive mentoring by a pair of CSU and UC faculty members, (3) tutoring, (4) professional development workshops, (5) exposure to research opportunities at various universities, and (6) membership in a growing cohort of like-minded students. In this poster, we report on our work in designing an effective mentoring program and developing tools like our mentoring and graduate application handbooks, and we discuss our tutoring program and the professional development workshops we have designed, and we report on their effectiveness. Funding for this program is provided by NSF-SSTEM Grant #1356133.
DOT National Transportation Integrated Search
2012-03-01
This report focused on two potential applications of terrestrial LiDAR scans on highway : bridges: 1) vehicle crossing effects measured by3-D, terrestrial LiDAR scans of highway bridges : measuring clearance distance; and 2) bridge post-blast geometr...
15. Photocopy of drawing, truss elevations, Bridge No. 79B, Main ...
15. Photocopy of drawing, truss elevations, Bridge No. 79B, Main & Washington Sts., So. Norwalk, Ct., N. Y. Division, N.Y., N.H. and H.R.R., dated April 21, 1895. Original on file with Construction Management and Facilities Engineering Department, Metro North Commuter Railroad, 420 Lexington Avenue, New York, N.Y. - South Norwalk Railroad Bridge, South Main & Washington Streets, Norwalk, Fairfield County, CT
Malagù, Michele; Trevisan, Filippo; Scalone, Antonella; Marcantoni, Lina; Sammarco, Giuseppe; Bertini, Matteo
2017-04-01
In patients undergoing cardiac device implantation, anticoagulant and antiplatelet therapy are associated with an increased risk of pocket hematoma. In case of vitamin K antagonist therapy, a strategy of continued warfarin with no heparin bridge showed a reduction of pocket hematoma. Evidence regarding antiplatelet therapy management is limited. This is a single-center observational study which reflects our systematic approach to the problem. In 2012, we proposed an improved management protocol for anticoagulant and antiplatelet therapy (no-bridge protocol) based on individual thromboembolic risk stratification, noninterruption of oral anticoagulation, no bridge with heparin and elastic adherence compression bandage. The primary end point was the incidence of clinically significant pocket hematoma in the first 30 days after implantation. A total of 1,035 patients were enrolled, of whom 522 received the standard management and 513 the new protocol. The primary end point occurred in 34 patients of the standard management group and 8 patients of the no-bridge protocol group (6.5% vs 1.6%, p <0.001). Patients in the standard management group had a higher incidence of pocket infections (2.3% vs 0.6%, p = 0.02), lead dislodgements (4.8% vs 2.1%, p = 0.02), and thromboembolic events (1.3% vs 0.0%, p <0.01). On a multivariate analysis, heparin and coronary artery disease were independent predictors of pocket hematoma (relative risk [RR] 3.48, 95% confidence interval [CI] 1.55 to 7.83 and RR 2.43, 95% CI 1.25 to 4.76, respectively), whereas the no-bridge protocol was associated with a reduction of pocket hematoma (RR 0.33, 95% CI 0.14 to 0.76). New anticoagulant and antiplatelet therapy management protocol was associated with a reduced incidence of clinically significant pocket hematomas, thromboembolic events, pocket infections, and lead dislodgements. Copyright © 2017 Elsevier Inc. All rights reserved.
6. BRIDGE OF CARRIER JFK SURROUNDED BY SCAFFOLDING FOR REHABILITATION ...
6. BRIDGE OF CARRIER JFK SURROUNDED BY SCAFFOLDING FOR REHABILITATION UNDER SERVICE LIFE EXTENSION PROGRAM (SLEP). - Naval Base Philadelphia-Philadelphia Naval Shipyard, Dry Dock No. 5, League Island, Philadelphia, Philadelphia County, PA
Bridge deck performance in Virginia.
DOT National Transportation Integrated Search
1971-01-01
One of the most comprehensive programs for the evaluation and definition of the performance of concrete in bridge decks was that undertaken cooperatively by the Portland Cement Association, the Bureau of Public Roads, and eight states distributed thr...
Berkes, Fikret
2009-04-01
Over a period of some 20 years, different aspects of co-management (the sharing of power and responsibility between the government and local resource users) have come to the forefront. The paper focuses on a selection of these: knowledge generation, bridging organizations, social learning, and the emergence of adaptive co-management. Co-management can be considered a knowledge partnership. Different levels of organization, from local to international, have comparative advantages in the generation and mobilization of knowledge acquired at different scales. Bridging organizations provide a forum for the interaction of these different kinds of knowledge, and the coordination of other tasks that enable co-operation: accessing resources, bringing together different actors, building trust, resolving conflict, and networking. Social learning is one of these tasks, essential both for the co-operation of partners and an outcome of the co-operation of partners. It occurs most efficiently through joint problem solving and reflection within learning networks. Through successive rounds of learning and problem solving, learning networks can incorporate new knowledge to deal with problems at increasingly larger scales, with the result that maturing co-management arrangements become adaptive co-management in time.
Algauer, Andrea; Rivera, Stephanie; Faurote, Robert
2015-01-01
With increasing wait times in emergency departments (ED) across America, there is a need to streamline the inpatient admission process in order to decrease wait times and more important, to increase patient and employee satisfaction. One inpatient unit at New York-Presbyterian Weill Cornell Medical Center initiated a program to help expedite the inpatient admission process from the ED. The goal of the ED Bridge program is to ease the patient's transition from the ED to an inpatient unit by visiting the patient in the ED and introducing and setting expectations for the inpatient environment (i.e. telemetry alarms, roommates, hourly comfort rounds). Along with improving the patient experience, this program intends to improve the collaboration between ED nurses and inpatient nurses. With the continued support of our nurse management, hospital administrators and most important, our staff, this concept is aimed to increase patient satisfaction scores and subsequently employee satisfaction. PMID:28725813
Robotic System for Condition Assessment of Concrete Bridge Decks : Data Driven Decisions [Tech Brief
DOT National Transportation Integrated Search
2012-12-11
In the United States, the stewardship and management of approximately 599,000 bridges present ongoing planning, operational, maintenance, and economic challenges for Federal, State, and local transportation agencies. To help overcome these challenges...
2015-06-12
PERSON a. REPORT b. ABSTRACT c. THIS PAGE 19b. PHONE NUMBER (include area code) (U) (U) (U) (U) 88 Standard Form 298 (Rev. 8-98) Prescribed by...with a collection of information if it does not display a currently valid OMB control number . PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1...CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) MAJ Andrew V. Walsh 5d. PROJECT NUMBER 5e. TASK NUMBER 5f
Transportation infrastructure : states' implementation of transportation management systems
DOT National Transportation Integrated Search
1997-01-13
This report focuses on the U.S. General Accounting Office's ISTEA update of the states' implementation of pavement management systems, bridges, highway safety, congestion management systems, public transportation, and intermodal management systems. A...
Internally cured concrete for pavement and bridge deck applications.
DOT National Transportation Integrated Search
2015-07-01
A laboratory and field testing program was conducted to evaluate the performance and usability of internally : cured concrete (ICC) using lightweight aggregates for bridge decks and concrete pavement slabs under Florida : conditions. The laboratory t...
A model study of bridge hydraulics
DOT National Transportation Integrated Search
2010-08-01
Most flood studies in the United States use the Army Corps of Engineers HEC-RAS (Hydrologic Engineering : Centers River Analysis System) computer program. This study was carried out to compare results of HEC-RAS : bridge modeling with laboratory e...
2003-03-04
KENNEDY SPACE CENTER, FLA. -- -- Lifting their shovels for the groundbreaking of the Operations Support Building II are (left to right) Bill Pickavance, Vice President & Deputy Program Manager Florida Operations, United Space Alliance; Mike Wetmore, director of Shuttle Processing; Miguel Morales, chief, Facilities Division, Spaceport Services; Mike Sumner, chief of operations, Spaceport Services; David Wolfberg, designer of the facility, with Architect and Engineers Wolfberg, Alvarez and Partners of Coral Gables; Roy Bridges, KSC director; and Don Minderman, OSB II project manager, Spaceport Services. Not shown: David Boland, David Boland Inc.(construction company). The new building will replace modular housing constructed more than 20 years ago and house NASA and contractor support staff for shuttle operations. The demolition of the modular buildings has begun and construction will immediately follow. The new structure is projected to be ready in April 2005.
NASA Technical Reports Server (NTRS)
2003-01-01
KENNEDY SPACE CENTER, FLA. -- -- Lifting their shovels for the groundbreaking of the Operations Support Building II are (left to right) Bill Pickavance, Vice President & Deputy Program Manager Florida Operations, United Space Alliance; Mike Wetmore, director of Shuttle Processing; Miguel Morales, chief, Facilities Division, Spaceport Services; Mike Sumner, chief of operations, Spaceport Services; David Wolfberg, designer of the facility, with Architect and Engineers Wolfberg, Alvarez and Partners of Coral Gables; Roy Bridges, KSC director; and Don Minderman, OSB II project manager, Spaceport Services. Not shown: David Boland, David Boland Inc.(construction company). The new building will replace modular housing constructed more than 20 years ago and house NASA and contractor support staff for shuttle operations. The demolition of the modular buildings has begun and construction will immediately follow. The new structure is projected to be ready in April 2005.
In-plane free vibration analysis of cable arch structure
NASA Astrophysics Data System (ADS)
Zhao, Yueyu; Kang, Houjun
2008-05-01
Cable-stayed arch bridge is a new type of composite bridge, which utilizes the mechanical characters of cable and arch. Based on the supporting members of cable-stayed arch bridge and of erection of arch bridge using of the cantilever construction method with tiebacks, we propose a novel mechanical model of cable-arch structure. In this model, the equations governing vibrations of the cable-arch are derived according to Hamilton's principle for dynamic problems in elastic body under equilibrium state. Then, the program of solving the dynamic governing equations is ultimately established by the transfer matrix method for free vibration of uniform and variable cross-section, and the internal characteristics of the cable-arch are investigated. After analyzing step by step, the research results approve that the program is accurate; meanwhile, the mechanical model and method are both valuable and significant not only in theoretical research and calculation but also in design of engineering.
Taipower`s radioactive waste management program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, B.C.C.
1996-09-01
Nuclear safety and radioactive waste management are the two major concerns of nuclear power in Taiwan. Recognizing that it is an issue imbued with political and social-economic concerns, Taipower has established an integrated nuclear backend management system and its associated financial and mechanism. For LLW, the Orchid Island storage facility will play an important role in bridging the gap between on-site storage and final disposal of LLW. Also, on-site interim storage of spent fuel for 40 years or longer will provide Taipower with ample time and flexibility to adopt the suitable alternative of direct disposal or reprocessing. In other words,more » by so exercising interim storage option, Taipower will be in a comfortable position to safely and permanently dispose of radwaste without unduly forgoing the opportunities of adopting better technologies or alternatives. Furthermore, Taipower will spare no efforts to communicate with the general public and make her nuclear backend management activities accountable to them.« less
Ouellet, Jean A.; Richards, Corey; Sardar, Zeeshan M.; Giannitsios, Demetri; Noiseux, Nicholas; Strydom, Willem S.; Reindl, Rudy; Jarzem, Peter; Arlet, Vincent; Steffen, Thomas
2013-01-01
The ideal treatment for unstable thoracolumbar fractures remains controversial with posterior reduction and stabilization, anterior reduction and stabilization, combined posterior and anterior reduction and stabilization, and even nonoperative management advocated. Short segment posterior osteosynthesis of these fractures has less comorbidities compared with the other operative approaches but settles into kyphosis over time. Biomechanical comparison of the divergent bridge construct versus the parallel tension band construct was performed for anteriorly destabilized T11–L1 spine segments using three different models: (1) finite element analysis (FEA), (2) a synthetic model, and (3) a human cadaveric model. Outcomes measured were construct stiffness and ultimate failure load. Our objective was to determine if the divergent pedicle screw bridge construct would provide more resistance to kyphotic deforming forces. All three modalities showed greater stiffness with the divergent bridge construct. The FEA calculated a stiffness of 21.6 N/m for the tension band construct versus 34.1 N/m for the divergent bridge construct. The synthetic model resulted in a mean stiffness of 17.3 N/m for parallel tension band versus 20.6 N/m for the divergent bridge (p = 0.03), whereas the cadaveric model had an average stiffness of 15.2 N/m in the parallel tension band compared with 18.4 N/m for the divergent bridge (p = 0.02). Ultimate failure load with the cadaveric model was found to be 622 N for the divergent bridge construct versus 419 N (p = 0.15) for the parallel tension band construct. This study confirms our clinical experience that the short posterior divergent bridge construct provides greater stiffness for the management of unstable thoracolumbar fractures. PMID:24436856
Code of Federal Regulations, 2011 CFR
2011-04-01
... Federal land management agency, to the extent appropriate, to develop by rule safety, bridge, pavement, and congestion management systems for roads funded under the FLHP. These management systems serve to...
Code of Federal Regulations, 2010 CFR
2010-04-01
... Federal land management agency, to the extent appropriate, to develop by rule safety, bridge, pavement, and congestion management systems for roads funded under the FLHP. These management systems serve to...
2001-02-08
At a groundbreaking ceremony, participants and guests get ready to dig in, signifying the start of construction on a new roadway through KSC. It is the start of a construction project that includes the Space Experiment Research & Processing Laboratory (SERPL). From left are Dr. Pamella J. Dana, from the executive office of Florida’s governor, Jeb Bush; Deputy Associate Administrator Michael Hawes, Space Station, NASA; Sen. George Kirkpatrick; Spaceport Florida Authority Executive Director Ed Gormel; Executive Director Dr. Samuel T. Durrance, Florida Space Research Institute; Florida’s Lt. Gov. Frank Brogan; Congressman Dave Weldon; Center Director Roy Bridges Jr.; SFA SERPL Program Manager Debra Holliday; KSC SERPL Program Manager Jan Heuser; District Manager Cheryl Harrison-Lee, Florida Department of Transportation; State Senator Jim Sebesta; and KSC Director JoAnn H. Morgan, External Relations and Business Development. The project is enabled by a partnership and collaboration between NASA and the State of Florida to create a vital resource for international and commercial space customers. SERPL is considered a magnet facility, and will support the development and processing of life sciences experiments destined for the International Space Station and accommodate NASA, industry and academic researchers performing associated biological research
Social marketing and public health intervention.
Lefebvre, R C; Flora, J A
1988-01-01
The rapid proliferation of community-based health education programs has out-paced the knowledge base of behavior change strategies that are appropriate and effective for public health interventions. However, experiences from a variety of large-scale studies suggest that principles and techniques of social marketing may help bridge this gap. This article discusses eight essential aspects of the social marketing process: the use of a consumer orientation to develop and market intervention techniques, exchange theory as a model from which to conceptualize service delivery and program participation, audience analysis and segmentation strategies, the use of formative research in program design and pretesting of intervention materials, channel analysis for devising distribution systems and promotional campaigns, employment of the "marketing mix" concept in intervention planning and implementation, development of a process tracking system, and a management process of problem analysis, planning, implementation, feedback and control functions. Attention to such variables could result in more cost-effective programs that reach larger numbers of the target audience.
Computerized fracture critical and specialized bridge inspection program with NDE applications
NASA Astrophysics Data System (ADS)
Fish, Philip E.
1998-03-01
Wisconsin Department of Transportation implemented a Fracture Critical & Specialized Inspection Program in 1987. The program has a strong emphasis on Nondestructive Testing (NDT). The program is also completely computerized, using laptop computers to gather field data, digital cameras for pictures, and testing equipment with download features. Final inspection reports with detailed information can be delivered within days of the inspection. The program requires an experienced inspection team and qualified personnel. Individuals performing testing must be licensed ASNT (American Society for Nondestructive Testing) Level III and must be licensed Certified Weld Inspectors (American Welding Society). Several critical steps have been developed to assure that each inspection identifies all possible deficiencies that may be possible on a Fracture Critical or Unique Bridge. They include; review of all existing plans and maintenance history; identification of fracture critical members, identification of critical connection details, welds, & fatigue prone details, development of visual and NDE inspection plan; field inspection procedures; and a detailed formal report. The program has found several bridges with critical fatigue conditions which have resulted in replacement or major rehabilitation. In addition, remote monitoring systems have been installed on structures with serious cracking to monitor for changing conditions.
11. DETAIL VIEW OF WELDED DATES 1896/1941 (S.E. CORNER) ...
11. DETAIL VIEW OF WELDED DATES - 1896/1941 (S.E. CORNER) 3 Photocopies of drawings labeled 'Bridge Rating Program by Boswell Engineering Company - Abbett Avenue Bridge, Spanning Whippany River at Abbett Avenue, Morristown, Morris County, NJ
Field Investigation of a Strengthened Timber Trestle Railroad Bridge
DOT National Transportation Integrated Search
2003-06-01
A three-span, open-deck timber trestle railroad bridge had been previously field load tested. The prior testing program was done in cooperation with the Transportation Technology Center, Inc. a subsidiary of the Association of American Railroads. The...
An overview of traffic monitoring programs in large urban areas
DOT National Transportation Integrated Search
2008-08-01
This report is intended to assist transportation and environmental professionals in the event of a bridge collapse or similar emergency. It analyzes the environmental review process in five cases of bridge reconstruction following collapse in Florida...
Bridging Cultures with Classroom Strategies.
ERIC Educational Resources Information Center
Rothstein-Fisch, Carrie; Greenfield, Patricia M.; Trumbull, Elise
1999-01-01
Collectivism, stressing family members' interdependence, is common to Latino cultures. In contrast, schools foster independence and individual achievement. To help teachers understand assumptions underlying these different values, the authors developed the "Bridging Cultures Project" as a research-based professional-development program.…
Code of Federal Regulations, 2010 CFR
2010-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.413 Funding. (a) Funds... the same period as funds apportioned for projects on the Federal-aid primary system. (b) The Federal...
Tool for analysis of early age transverse cracking of composite bridge decks.
DOT National Transportation Integrated Search
2011-08-29
"Executive Summary: Computational methods and associated software were developed : to compute stresses in HP concrete composite bridge decks due to temperature, shrinkage, and : vehicle loading. The structural analysis program uses a layered finite e...
Bridge Approach Remedies Implemented at Western Mega Site
DOT National Transportation Integrated Search
2017-09-01
As part of the heavy axle load (HAL) revenue service mega site testing program, the Transportation Technology Center, Inc. (TTCI) has worked closely with the Union Pacific Railroad (UP) to address bridge approach problems under HAL operations. The te...
Fuzzy Based Decision Support System for Condition Assessment and Rating of Bridges
NASA Astrophysics Data System (ADS)
Srinivas, Voggu; Sasmal, Saptarshi; Karusala, Ramanjaneyulu
2016-09-01
In this work, a knowledge based decision support system has been developed to efficiently handle the issues such as distress diagnosis, assessment of damages and condition rating of existing bridges towards developing an exclusive and robust Bridge Management System (BMS) for sustainable bridges. The Knowledge Based Expert System (KBES) diagnoses the distresses and finds the cause of distress in the bridge by processing the data which are heuristic and combined with site inspection results, laboratory test results etc. The coupling of symbolic and numeric type of data has been successfully implemented in the expert system to strengthen its decision making process. Finally, the condition rating of the bridge is carried out using the assessment results obtained from the KBES and the information received from the bridge inspector. A systematic procedure has been developed using fuzzy mathematics for condition rating of bridges by combining the fuzzy weighted average and resolution identity technique. The proposed methodologies and the decision support system will facilitate in developing a robust and exclusive BMS for a network of bridges across the country and allow the bridge engineers and decision makers to carry out maintenance of bridges in a rational and systematic way.
NASA Astrophysics Data System (ADS)
Ni, Y. Q.; Fan, K. Q.; Zheng, G.; Chan, T. H. T.; Ko, J. M.
2003-08-01
An automatic modal identification program is developed for continuous extraction of modal parameters of three cable-supported bridges in Hong Kong which are instrumented with a long-term monitoring system. The program employs the Complex Modal Indication Function (CMIF) algorithm to identify modal properties from continuous ambient vibration measurements in an on-line manner. By using the LabVIEW graphical programming language, the software realizes the algorithm in Virtual Instrument (VI) style. The applicability and implementation issues of the developed software are demonstrated by using one-year measurement data acquired from 67 channels of accelerometers deployed on the cable-stayed Ting Kau Bridge. With the continuously identified results, normal variability of modal vectors caused by varying environmental and operational conditions is observed. Such observation is very helpful for selection of appropriate measured modal vectors for structural health monitoring applications.
Agrawal, Hitesh; Molossi, Silvana; Alam, Mahboob; Sexson-Tejtel, S Kristen; Mery, Carlos M; McKenzie, E Dean; Fraser, Charles D; Qureshi, Athar M
2017-03-01
The evaluation of the vast majority of children with anomalous aortic origin of a coronary artery (AAOCA) and/or myocardial bridges is performed with non-invasive testing. However, a subset of these patients may benefit from invasive testing for risk stratification. All patients included in the Coronary Anomalies Program (CAP) at Texas Children's Hospital who underwent cardiac catheterization were included. Techniques included selective coronary angiograms (SCA), intravascular ultrasound (IVUS), and fractional flow reserve (FFR) measurements with provocative testing using adenosine and/or dobutamine infusions. Out of the 131 patients followed by the CAP between 12/12-4/16, 8 (6%) patients underwent 9 cath investigations at median age 13.1 (2.6-18.7) years and median weight 49.5 (11.4-142.7) kg. Six patients presented with cardiac signs/symptoms. Four patients had myocardial bridges of the left anterior descending (LAD) coronary artery, 2 patients had isolated AAOCA, and 2 patients had an anomalous left coronary artery (LCA) with an intramyocardial course of the LAD. SCA was performed in all patients. FFR was positive in 4/6 patients: IVUS showed >70% intraluminal narrowing in 3/5 patients. One patient had hemodynamic instability that reversed with catheter removal from the coronary ostium. Based on the catheterization data obtained, findings were reassuring in three patients, surgery was performed in three patients, and two patients are being medically managed/restricted from competitive sports. In our small cohort of patients, we demonstrated that IVUS and FFR can safely be performed in children and may help to risk stratify some patients with AAOCA and myocardial bridges.
Best management practices for storage of historic metal truss bridges.
DOT National Transportation Integrated Search
2014-07-01
As part of a 2002 agreement with the FHWA, GDOT has committed to consider storing metal truss : bridges of historic value in lieu of demolition, until a recipient could be located. This research addresses the most : effective processes for storage of...
Best practices for the rehabilitation and moving of historic metal truss bridges.
DOT National Transportation Integrated Search
2006-01-01
The Virginia Department of Transportation and the Department of Historic Resources are responsible for the management of about 30 historic truss bridges. All too often, these structures do not meet today's traffic demands or safety standards. Their g...
2011-12-01
effectiveness and speed) of current and future operations and programs; • serves as a bridge between disaster preparedness and response, between...mission due to the massive devastation that destroyed roads, bridges , and docks (Elleman, 2007). 4. Logistics Productivity of Aircraft LTG Phillip...may be needed. This assistance can include helicopter transportation, road and bridge repair, or delivery of temporary water supplies. The
HEC-RAS 2.2 for backwater and scour analysis - phase one
DOT National Transportation Integrated Search
2000-09-01
The Kansas Department of Transportation (KDOT) and most bridge consultants in Kansas have been using the DOS-WSPRO program and the KDOT scour spreadsheets to perform bridge hydraulics and scour analysis for the past several years. Unfortunately, DOS-...
Development of a TL-3 deep beam tubular backup bridge rail.
DOT National Transportation Integrated Search
2010-12-01
The objective of this study is to investigate the performance of the Ohio Department of Transportation (ODOT) Deep Beam bridge rail system per the National Cooperative Highway Research Program (NCHRP) Report 350 TL-3. Analytical study, computer simul...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Funding. 650.413 Section 650.413 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.413 Funding. (a) Funds...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Funding. 650.413 Section 650.413 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.413 Funding. (a) Funds...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Funding. 650.413 Section 650.413 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.413 Funding. (a) Funds...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Funding. 650.413 Section 650.413 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.413 Funding. (a) Funds...
FHWA study tour for advanced composites in bridges in Europe and Japan
DOT National Transportation Integrated Search
1997-10-01
Under the Federal Highway Administration's (FHWA) International Technology Scanning Program, a team of 13 U.S. bridge engineers and advanced composite experts from Federal and State transportation agencies, academia, and industry conducted a 2-week s...
Implementation of high performance concrete in Louisiana bridges : interim report.
DOT National Transportation Integrated Search
1998-02-01
The report contains a research plan to assist in the implementation of high performance concrete in the Charenton Canal Bridge in Louisiana. The research involves a literature review, plan review, development of a quality control program for the conc...
History of Connecticut's short-term strain program for evaluation of steel bridges : July 2009.
DOT National Transportation Integrated Search
2009-07-01
Non-destructive strain monitoring has been used for two decades on Connecticuts bridges to : supplement visual field inspections. These studies have addressed a wide range of problems, : including fatigue cracking in diaphragm connections, cracked...
1998-12-01
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, Center Director Roy Bridges (left), Program Manager of the International Space Station (ISS) Randy Brinkley (second from left) and STS-98 Commander Ken Cockrell (right) applaud the unveiling of the name "Destiny" for the U.S. Laboratory module. The lab, which is behnd them on a workstand, is scheduled to be launched on STS-98 on Space Shuttle Endeavour in early 2000. It will become the centerpiece of scientific research on the ISS. The Shuttle will spend six days docked to the Station while the laboratory is attached and three spacewalks are conducted to compete its assembly. The laboratory will be launched with five equipment racks aboard, which will provide essential functions for Station systems, including high data-rate communications, and maintain the Station's orientation using control gyroscopes launched earlier. Additional equipment and research racks will be installed in the laboratory on subsequent Shuttle flights.
Dynamic Interaction of Long Suspension Bridges with Running Trains
NASA Astrophysics Data System (ADS)
XIA, H.; XU, Y. L.; CHAN, T. H. T.
2000-10-01
This paper presents an investigation of dynamic interaction of long suspension bridges with running trains. A three-dimensional finite element model is used to represent a long suspension bridge. Each 4-axle vehicle in a train is modelled by a 27-degrees-of-freedom dynamic system. The dynamic interaction between the bridge and train is realized through the contact forces between the wheels and track. By applying a mode superposition technique to the bridge only and taking the measured track irregularities as known quantities, the number of degrees of freedom (d.o.f.) the bridge-train system is significantly reduced and the coupled equations of motion are efficiently solved. The proposed formulation and the associated computer program are then applied to a real long suspension bridge carrying a railway within the bridge deck. The dynamic response of the bridge-train system and the derail and offload factors related to the running safety of the train are computed. The results show that the formulation presented in this paper can well predict dynamic behaviors of both bridge and train with reasonable computation efforts. Dynamic interaction between the long suspension bridge and train is not significant.
Agri-environmental collaboratives as bridging organisations in landscape management.
Prager, Katrin
2015-09-15
In recent years, landscape and its management has become a focus of policies and academic conceptualisation. Landscape is understood as a concept of interconnected natural and human systems. Its management must take into account the dynamic interdependencies and diverging interests of various stakeholders at different levels. Bridging organisations can provide an arena for trust-building, conflict resolution, learning and collaboration between relevant stakeholders. This paper draws on two strands of literature - landscape governance and co-management of social-ecological systems - to investigate the contributions of agri-environmental collaboratives (AEC) to sustainable landscape management. Based on data from 41 interviews with key informants and AEC members in Germany and the Netherlands, six fields of contributions were identified: policy implementation and service provision; coordination and mediation; awareness raising and behaviour change; care for 'everyday' landscapes; maintenance and protection of landscapes (including species and habitats); and income generation and economic benefits. Some of the contributions evolve around the specific role of AEC as bridging organisations, but other contributions such as economic benefits emerge beyond this analytical lens. The paper therefore emphasises holistic, bottom up assessment of AEC contributions and argues that governments should support such organisations through i) funding for facilitators and ii) funding for impact monitoring and data management. Copyright © 2015 Elsevier Ltd. All rights reserved.
DOT National Transportation Integrated Search
2016-09-29
This project piloted the findings from an initial research and development project pertaining to the detection, : quantification, and visualization of bridge deck distresses through the use of remote sensing techniques, specifically : combining optic...
Examining the Role of Metadata in Testing IED Detection Systems
2009-09-01
energy management, crop assessment, weather forecasting, disaster alerts, and endangered species assessment [ Biagioni and Bridges 2002; Main- waring et...accessed June 10, 2008). Biagioni , E. and K. Bridges. 2002. The application of remote sensor technology to assist the recovery of rare endangered species
Managing Stress for At-Risk Students
ERIC Educational Resources Information Center
Spiegel, Ellen J.
2017-01-01
The BRIDGE Alternative Middle School in Lowell, Massachusetts, serves students ages 12-16 who have exhibited behavioral problems in traditional school settings, including problems such as truancy, multiple suspensions, mental health issues, peer conflicts, family dysfunction, academic problems, and gang involvement. Students referred to BRIDGE are…
Veth, Klaske N; Van der Heijden, Beatrice I J M; Korzilius, Hubert P L M; De Lange, Annet H; Emans, Ben J M
2018-01-01
This two-wave complete panel study aims to examine human resource management (HRM) bundles of practices in relation to social support [i.e., leader-member exchange (LMX), coworker exchange (CWX)] and employee outcomes (i.e., work engagement, employability, and health), within a context of workers aged 65+. Based upon the social exchange theory and the Job Demands-Resources (JD-R) framework, it was hypothesized that HRM bundles at Time 1 would increase bridge workers' outcomes at Time 2, and that this relationship would be mediated by perceptions of LMX and CWX at Time 2. Using a longitudinal design, hypotheses were tested in a unique sample of Dutch bridge employees ( N = 228). Results of several structural equation modeling analyses revealed no significant associations between HRM bundles, and social support, moreover, no significant associations were found in relation to employee outcomes. However, the results of the best-fitting final model revealed the importance of the impact of social support on employee (65+) outcomes over time.
Application of Artificial Intelligence for Bridge Deterioration Model.
Chen, Zhang; Wu, Yangyang; Li, Li; Sun, Lijun
2015-01-01
The deterministic bridge deterioration model updating problem is well established in bridge management, while the traditional methods and approaches for this problem require manual intervention. An artificial-intelligence-based approach was presented to self-updated parameters of the bridge deterioration model in this paper. When new information and data are collected, a posterior distribution was constructed to describe the integrated result of historical information and the new gained information according to Bayesian theorem, which was used to update model parameters. This AI-based approach is applied to the case of updating parameters of bridge deterioration model, which is the data collected from bridges of 12 districts in Shanghai from 2004 to 2013, and the results showed that it is an accurate, effective, and satisfactory approach to deal with the problem of the parameter updating without manual intervention.
Application of Artificial Intelligence for Bridge Deterioration Model
Chen, Zhang; Wu, Yangyang; Sun, Lijun
2015-01-01
The deterministic bridge deterioration model updating problem is well established in bridge management, while the traditional methods and approaches for this problem require manual intervention. An artificial-intelligence-based approach was presented to self-updated parameters of the bridge deterioration model in this paper. When new information and data are collected, a posterior distribution was constructed to describe the integrated result of historical information and the new gained information according to Bayesian theorem, which was used to update model parameters. This AI-based approach is applied to the case of updating parameters of bridge deterioration model, which is the data collected from bridges of 12 districts in Shanghai from 2004 to 2013, and the results showed that it is an accurate, effective, and satisfactory approach to deal with the problem of the parameter updating without manual intervention. PMID:26601121
A novel methodology for quantifying the performance of constructed bridges in cold regions.
DOT National Transportation Integrated Search
2014-04-01
This report presents a two-part research program examining the performance of constructed bridges in a : cold region, represented by those in the State of North Dakota, and the behavior of concrete members : strengthened with carbon fiber reinforced ...
DOT National Transportation Integrated Search
2016-10-01
The Louisiana Transportation Research Center has worked closely with the Bridge : Design section of the Louisiana Department of Transportation and Development : (DOTD) to develop a workable specification for standard and localized roughness : of brid...
Test plan : Branson TRIP travel time/data accuracy
DOT National Transportation Integrated Search
2000-04-01
In the mid 1990's the FHWA established a High Performance Concrete (HPC) program aimed at demonstrating the positive effects of utilizing HPC in bridges. Research on the benefits of using high performance concrete for bridges has shown a number of be...
DOT National Transportation Integrated Search
2014-04-01
This report presents a two-part research program examining the performance of constructed : bridges in a cold region, represented by those in the State of North Dakota, and the behavior of : concrete members strengthened with carbon fiber reinforced ...
DOT National Transportation Integrated Search
2015-12-01
Ever since the introduction of the National Bridge Inspection Standards (NBIS) in 1971, there has been a : tremendous amount of effort put into bridge rehabilitation programs and safety inspections. The : Wyoming Department of Transportation (WYDOT) ...
Community Garden: A Bridging Program between Formal and Informal Learning
ERIC Educational Resources Information Center
Datta, Ranjan
2016-01-01
Community garden activities can play a significant role in bridging formal and informal learning, particularly in urban children's science and environmental education. It promotes relational methods of learning, discussing, and practicing that will integrate food security, social interactions, community development, environmental activism, and…
NITARP: Bridging the Gap Between the Traditional Science Classroom and Authentic Research
NASA Astrophysics Data System (ADS)
Stalnaker, Olivia K.; Evans, Sam; Rutherford, Thomas; Taylor, John; Rebull, Luisa
2018-01-01
In this poster, the differences between what occurs in the traditional secondary science classroom and what happens in the actual research world is examined. Secondary classroom teachers generally have limited, if any, research experience beyond what is presented through their undergraduate college lab coursework. A disparity exists between classroom laboratory work and professional research. Opportunities like NITARP provide research elements that bridge this gap. NITARP teams are in a unique situation, joining a small team working alongside Caltech researchers on cutting edge investigations in astrophysics. In this poster it is shown how the NITARP program provides key components and experiences to expand the skill sets that teachers bring to their classrooms, bridging the gap between the typical secondary classroom and the world of the professional researcher. The NASA/IPAC program immerses participating teachers into a year-long training experience via online and face-to-face learning that translates into enhanced instruction at the secondary level. This work was made possible through the NASA/IPAC Teacher Archive Research Program (NITARP) and was funded by NASA Astrophysics Data Program.
2003-06-20
KENNEDY SPACE CENTER, FLA. - Center Director and former astronaut Roy D. Bridges, Jr., (holding scissors) cuts the ribbon at a ceremony officially opening the U.S. Astronaut Hall of Fame as part of the Kennedy Space Center Visitor Complex. Invited guests and dignitaries look on, such as former astronauts Edgar D. Mitchell on Bridges' left and James Lovell on his right. The ceremony was held in conjunction with the induction of four Space Shuttle astronauts into the Hall of Fame including Daniel Brandenstein, Robert "Hoot" Gibson, Story Musgrave, and Sally Ride. Conceived by six of the Mercury Program astronauts, the U.S. Astronaut Hall of Fame opened in 1990 to provide a place where space travelers could be remembered for their participation and accomplishments in the U.S. space program. The four new inductees join 48 previously honored astronauts from the ranks of the Gemini, Apollo, Skylab, Apollo-Soyuz, and Space Shuttle programs.
Developing Researching Managers and Relevant Research--The "Executive Research Programme"
ERIC Educational Resources Information Center
Werr, Andreas; Strannegård, Lars
2014-01-01
The current paper argues for bridging the "relevance gap" in management research and education by creating educational programmes that bring together experienced managers and management researchers. In the "Executive Research Programme" discussed in this paper, managers were paired up with researchers to conduct a collaborative…
Analysis, prediction, and case studies of early-age cracking in bridge decks
NASA Astrophysics Data System (ADS)
ElSafty, Adel; Graeff, Matthew K.; El-Gharib, Georges; Abdel-Mohti, Ahmed; Mike Jackson, N.
2016-06-01
Early-age cracking can adversely affect strength, serviceability, and durability of concrete bridge decks. Early age is defined as the period after final setting, during which concrete properties change rapidly. Many factors can cause early-age bridge deck cracking including temperature change, hydration, plastic shrinkage, autogenous shrinkage, and drying shrinkage. The cracking may also increase the effect of freeze and thaw cycles and may lead to corrosion of reinforcement. This research paper presents an analysis of causes and factors affecting early-age cracking. It also provides a tool developed to predict the likelihood and initiation of early-age cracking of concrete bridge decks. Understanding the concrete properties is essential so that the developed tool can accurately model the mechanisms contributing to the cracking of concrete bridge decks. The user interface of the implemented computer Excel program enables the user to input the properties of the concrete being monitored. The research study and the developed spreadsheet were used to comprehensively investigate the issue of concrete deck cracking. The spreadsheet is designed to be a user-friendly calculation tool for concrete mixture proportioning, temperature prediction, thermal analysis, and tensile cracking prediction. The study also provides review and makes recommendations on the deck cracking based mainly on the Florida Department of Transportation specifications and Structures Design Guidelines, and Bridge Design Manuals of other states. The results were also compared with that of other commercially available software programs that predict early-age cracking in concrete slabs, concrete pavement, and reinforced concrete bridge decks. The outcome of this study can identify a set of recommendations to limit the deck cracking problem and maintain a longer service life of bridges.